10-Q
0001921865Q3false--12-31http://fasb.org/srt/2026#ChiefExecutiveOfficerMemberSeptember 30, 20280.030.010.0130.013October 31 2025October 31 2025January 31 2026March 31 20560001921865aspi:ProvedReservesMember2026-09-300001921865aspi:PrefundedWarrantMemberaspi:ENDRALifeSciencesIncMember2026-05-270001921865us-gaap:NoncontrollingInterestMember2025-12-310001921865us-gaap:USTreasurySecuritiesMemberus-gaap:FairValueInputsLevel1Member2025-12-310001921865aspi:RenergenLimitedMember2026-04-012026-06-300001921865us-gaap:StockOptionMember2026-09-300001921865aspi:NobleMemberaspi:MergerAgreementMember2026-06-252026-06-250001921865us-gaap:RetainedEarningsMemberus-gaap:IPOMember2025-07-012025-09-3000019218652025-08-012025-08-310001921865us-gaap:SegmentDiscontinuedOperationsMember2026-01-012026-09-300001921865us-gaap:IPOMemberus-gaap:TreasuryStockCommonMember2025-04-012025-06-300001921865aspi:SkylineExchangeAgreementMemberaspi:SkylineBuildersGroupHoldingLtdMember2026-01-012026-09-300001921865us-gaap:StockOptionMember2025-01-012025-09-300001921865us-gaap:NoncontrollingInterestMember2026-01-012026-03-310001921865aspi:JuneTwoThousandAndTwentyFiveMember2025-06-300001921865aspi:AIRSOLMember2026-08-040001921865aspi:IsoBioIncMember2026-09-300001921865aspi:HeliumAndLNGMember2025-07-012025-09-3000019218652026-09-300001921865us-gaap:PropertyPlantAndEquipmentMembersrt:MaximumMember2026-01-012026-09-300001921865us-gaap:SegmentDiscontinuedOperationsMemberaspi:SkylineMember2025-07-012025-09-300001921865aspi:ProvedReservesMember2025-12-310001921865aspi:SpecialistIsotopesAndRelatedServicesMember2025-07-012025-09-300001921865aspi:QLE2024EquityIncentivePlanMember2024-03-012024-03-310001921865aspi:SpecialistIsotopesAndRelatedServicesMemberus-gaap:ProductMember2026-01-012026-09-300001921865aspi:TotalSegmentMember2025-01-012025-09-3000019218652025-10-010001921865aspi:SkylineBuildersGroupHoldingLtdMemberus-gaap:TreasuryStockCommonMember2025-07-012025-09-300001921865aspi:FinanceLeasesMember2026-09-300001921865aspi:FacilityAgreementMember2019-08-200001921865us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:USTreasurySecuritiesMember2026-09-300001921865aspi:TotalSegmentMember2026-01-012026-09-300001921865aspi:ConvertibleNotesMember2026-07-160001921865aspi:EastCoastNuclearPharmacyLLCMember2025-12-3100019218652026-11-160001921865us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-06-300001921865us-gaap:CommonStockMember2025-12-310001921865aspi:PromissoryNotesOneMember2026-09-300001921865aspi:RenergenLimitedMemberus-gaap:AdditionalPaidInCapitalMember2026-04-012026-06-300001921865aspi:NuclearFuelsMember2025-07-012025-09-300001921865aspi:CustomerMemberus-gaap:AccountsReceivableMemberus-gaap:CustomerConcentrationRiskMember2025-01-012025-12-310001921865aspi:HeliumAndLNGMember2026-07-012026-09-3000019218652024-12-310001921865aspi:TerraPowerLoanAgreementMember2025-05-312025-05-310001921865aspi:ENDRALifeSciencesIncMember2026-07-012026-09-300001921865us-gaap:RetainedEarningsMember2024-12-310001921865us-gaap:UnsecuredDebtMember2026-09-300001921865aspi:RenergenFirmIntentionLetterAndLoanAgreementMember2025-05-192025-05-190001921865aspi:RenergenLimitedMemberus-gaap:NoncontrollingInterestMember2026-04-012026-06-300001921865aspi:OpeongoMember2026-07-012026-09-300001921865us-gaap:UnsecuredDebtMemberus-gaap:ShareBasedCompensationAwardTrancheOneMemberaspi:AIRSOLMember2023-08-302023-08-300001921865aspi:CollaborationRevenueMember2025-07-012025-09-300001921865aspi:SharePurchaseAgreementRelatingToPetLabsMember2026-09-300001921865aspi:OpeongoMember2026-09-300001921865us-gaap:GeneralAndAdministrativeExpense2025-07-012025-09-300001921865aspi:SpecialistIsotopesAndRelatedServicesMemberus-gaap:ProductMember2026-07-012026-09-300001921865aspi:IDCLoanMember2026-01-012026-09-300001921865us-gaap:AdditionalPaidInCapitalMember2025-03-310001921865aspi:ConstructionServicesSpecialistIsotopesAndRelatedServicesMember2025-12-310001921865us-gaap:UnsecuredDebtMember2014-04-112014-04-110001921865us-gaap:CommonStockMemberus-gaap:IPOMember2025-07-012025-09-300001921865srt:MaximumMemberaspi:SoftwareMember2026-01-012026-09-300001921865us-gaap:IPOMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2025-04-012025-06-3000019218652025-12-310001921865aspi:RenergenLimitedMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2026-04-012026-06-300001921865aspi:CollaborationRevenueMemberaspi:NuclearFuelsMember2026-01-012026-09-300001921865us-gaap:TreasuryStockCommonMember2025-03-310001921865us-gaap:CommonStockMemberus-gaap:IPOMember2025-04-012025-06-300001921865aspi:HeliumAndLNGMember2026-09-300001921865us-gaap:SubsequentEventMemberaspi:CertainFirstAmendmentToMergerAgreementMember2026-10-010001921865aspi:RenergenMember2026-09-300001921865country:US2025-01-012025-09-300001921865us-gaap:CommonStockMemberaspi:RenergenLimitedMember2026-07-012026-09-300001921865us-gaap:ResearchAndDevelopmentExpense2025-07-012025-09-300001921865us-gaap:FairValueInputsLevel3Memberus-gaap:USTreasurySecuritiesMember2026-09-300001921865aspi:EnlightenedIsotopesMember2026-09-300001921865us-gaap:TreasuryStockCommonMember2025-09-300001921865us-gaap:SecuredDebtMemberaspi:SBSALoanMember2024-08-300001921865us-gaap:FairValueInputsLevel3Memberus-gaap:ConvertibleNotesPayableMember2026-09-300001921865us-gaap:TreasuryStockCommonMember2025-07-012025-09-300001921865us-gaap:CommonStockMember2025-03-310001921865aspi:TwoThousandAndTwentyOneStockIncentivePlanMember2021-10-310001921865aspi:MergerAgreementMemberaspi:ENDRALifeSciencesIncMember2026-06-250001921865us-gaap:ProductMemberaspi:HeliumAndLNGMember2026-07-012026-09-300001921865us-gaap:CommonStockMember2026-09-300001921865us-gaap:SalesRevenueNetMember2025-01-012025-09-300001921865srt:MinimumMemberaspi:IsoBioAndSkylinesJointVenturesWithKC-GloryJVKC-GeotechJVAndKC-CRFGJVMember2026-09-3000019218652024-06-012024-06-300001921865aspi:NuMedDiagnosticsLLCMemberus-gaap:NoncontrollingInterestMember2026-01-012026-03-310001921865us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-01-012025-03-310001921865us-gaap:SegmentDiscontinuedOperationsMemberaspi:SkylineMember2026-03-290001921865aspi:ENDRALifeSciencesIncMember2026-05-310001921865us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-06-300001921865aspi:USTreasurySecuritiesMatureApril2026Member2025-12-310001921865us-gaap:CommonStockMember2026-07-012026-09-300001921865us-gaap:AdditionalPaidInCapitalMember2025-06-300001921865aspi:IsoBioIncMember2025-12-310001921865us-gaap:AdditionalPaidInCapitalMember2026-07-012026-09-300001921865aspi:CommonStockWarrantsMember2025-05-012025-05-310001921865us-gaap:TreasuryStockCommonMember2025-06-3000019218652025-04-012025-06-300001921865aspi:NuclearFuelsMember2026-01-012026-09-300001921865aspi:CommonStockWarrantsMember2025-07-012025-07-310001921865aspi:ClassAUnitsMemberaspi:NobleMemberaspi:MergerAgreementMember2026-06-252026-06-250001921865us-gaap:ProductMemberaspi:HeliumAndLNGMember2026-01-012026-09-300001921865aspi:MergerAgreementMemberaspi:ENDRALifeSciencesIncMember2026-06-252026-06-250001921865us-gaap:CommonClassAMemberaspi:SkylineBuildersGroupHoldingLtdMemberaspi:SecuritiesPurchaseAgreementMemberaspi:WarrantBMembersrt:MaximumMember2025-08-290001921865us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:ConvertibleNotesPayableMember2026-09-300001921865aspi:OpeongoMember2026-01-012026-09-300001921865us-gaap:UnsecuredDebtMember2024-11-140001921865aspi:NuMedDiagnosticsLLCMember2026-01-012026-03-310001921865aspi:WellsInProcessMember2025-12-310001921865srt:MinimumMemberaspi:OfficeFurnitureMember2026-01-012026-09-300001921865us-gaap:AdditionalPaidInCapitalMember2026-01-012026-03-310001921865us-gaap:CommonStockMember2026-03-310001921865us-gaap:FairValueInputsLevel3Memberus-gaap:ConvertibleNotesPayableMember2025-12-310001921865aspi:SecuredLetterOfCreditInLieuOfLeaseDepositForQLEMember2026-09-300001921865aspi:RenergenLimitedMember2025-04-012025-04-300001921865aspi:CreditFacilityMember2026-09-300001921865aspi:SkylineExchangeAgreementMemberaspi:SkylineBuildersGroupHoldingLtdMember2026-03-290001921865us-gaap:USTreasurySecuritiesMemberus-gaap:FairValueInputsLevel1Member2026-09-300001921865aspi:OtherAssetMember2026-07-012026-09-300001921865aspi:OfficeFurnitureMember2025-12-310001921865us-gaap:SecuredDebtMember2025-12-310001921865us-gaap:TreasuryStockCommonMember2024-12-310001921865us-gaap:TreasuryStockCommonMember2025-04-012025-06-300001921865us-gaap:FairValueInputsLevel3Memberus-gaap:ConvertibleNotesPayableMember2025-01-012025-12-310001921865aspi:RehabilitationAssetMember2026-09-300001921865aspi:NuclearFuelsMemberus-gaap:ProductMember2026-01-012026-09-300001921865aspi:JulyTwoThousandAndTwentySixMember2026-07-310001921865aspi:JulyTwoThousandTwentyFiveMember2025-07-310001921865aspi:ReservingSixMonthsOfPaymentsToFulfillObligationsUnderTheDFCCreditFacilityMember2026-09-300001921865aspi:ConvertibleNotesMember2026-07-012026-09-300001921865aspi:TwoThousandTwentyFiveInducementEquityIncentivePlanMember2025-07-160001921865aspi:CollaborationRevenueMember2026-07-012026-09-300001921865us-gaap:RestrictedStockUnitsRSUMember2026-01-012026-09-300001921865country:ZA2025-07-012025-09-300001921865aspi:NobleMemberaspi:MergerAgreementMemberaspi:PrefundedWarrantsMember2026-06-250001921865us-gaap:RetainedEarningsMember2026-01-012026-03-310001921865aspi:ENDRALifeSciencesIncMember2026-05-270001921865aspi:TwoThousandTwentyFiveConvertibleNotesMemberaspi:QuantumLeapEnergyLLCMember2025-11-120001921865aspi:IsoBioIncMember2025-12-310001921865aspi:JuneTwoThousandAndTwentyFiveMember2025-06-012025-06-300001921865us-gaap:SalesRevenueNetMember2026-01-012026-09-300001921865us-gaap:AdditionalPaidInCapitalMember2025-07-012025-09-300001921865aspi:RenergenMember2026-01-012026-09-300001921865us-gaap:FairValueInputsLevel2Member2026-09-300001921865aspi:QuantumLeapEnergyLLCMemberaspi:TwoThousandTwentyFiveNotesMember2025-11-012025-11-300001921865us-gaap:FairValueInputsLevel1Member2026-09-300001921865srt:MaximumMemberaspi:OfficeFurnitureMember2026-01-012026-09-300001921865aspi:TotalSegmentMember2025-07-012025-09-300001921865aspi:MotorVehicleAndEquipmentLoansMember2026-01-012026-09-300001921865aspi:MotorVehicleAndEquipmentLoansMember2026-07-012026-09-300001921865aspi:ElectricityPaymentsAndEarlyTerminationGuarantiesMember2026-09-300001921865us-gaap:TreasuryStockCommonMember2026-07-012026-09-300001921865aspi:VieAspRentalsMember2026-09-300001921865srt:MinimumMember2026-01-012026-09-300001921865aspi:IsoBioIncMember2026-07-012026-09-300001921865us-gaap:NoncontrollingInterestMember2026-06-300001921865us-gaap:CommonStockMember2025-01-012025-03-310001921865us-gaap:EquityMethodInvestmentsMemberus-gaap:FairValueInputsLevel1Member2026-09-300001921865aspi:ToolsMachineryAndEquipmentMembersrt:MaximumMember2026-01-012026-09-300001921865aspi:SixthAddendumToASPITermLoanFacilityMemberus-gaap:SubsequentEventMemberaspi:RenergenMember2026-10-010001921865aspi:PlantAndOfficeBuildingsMember2026-09-300001921865aspi:CommonStockWarrantsMember2025-09-300001921865us-gaap:SecuredDebtMemberaspi:IDCLoanMember2026-01-012026-09-300001921865aspi:One30SevenIncMember2025-10-012025-10-310001921865aspi:SpecialistIsotopesAndRelatedServicesMember2025-01-012025-09-300001921865aspi:ConstructionServicesSpecialistIsotopesAndRelatedServicesMember2025-01-012025-12-310001921865us-gaap:TreasuryStockCommonMember2026-03-310001921865us-gaap:AccumulatedOtherComprehensiveIncomeMember2024-12-310001921865aspi:SpecialistIsotopesAndRelatedServicesMemberus-gaap:ProductMember2025-01-012025-09-300001921865us-gaap:ResearchAndDevelopmentExpense2025-01-012025-09-300001921865country:ZA2025-01-012025-09-300001921865us-gaap:GeneralAndAdministrativeExpense2026-01-012026-09-300001921865aspi:HeliumAndLNGMember2026-01-012026-09-3000019218652024-03-012024-03-310001921865aspi:StockAwardsMember2025-07-012025-09-300001921865us-gaap:SegmentDiscontinuedOperationsMemberaspi:SkylineMember2026-03-280001921865aspi:StockAwardsMember2026-07-012026-09-300001921865us-gaap:CommonClassAMemberaspi:SkylineBuildersGroupHoldingLtdMemberaspi:SecuritiesPurchaseAgreementMemberaspi:WarrantBMember2025-08-290001921865us-gaap:SegmentDiscontinuedOperationsMember2025-12-310001921865us-gaap:TreasuryStockCommonMember2025-01-012025-03-310001921865aspi:ENDRALifeSciencesIncMember2026-09-300001921865us-gaap:CommonStockMember2026-01-012026-03-310001921865aspi:IsoBioIncMember2026-09-300001921865us-gaap:TreasuryStockCommonMember2026-09-300001921865aspi:NuMedDiagnosticsLLCMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2026-01-012026-03-310001921865aspi:CommonStockWarrantsMember2025-07-310001921865us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:OtherLongTermInvestments2026-09-300001921865us-gaap:GeneralAndAdministrativeExpense2026-07-012026-09-300001921865aspi:OtherAssetMember2025-07-012025-09-3000019218652024-01-012025-07-310001921865aspi:PETLabsMember2025-12-312025-12-310001921865us-gaap:FairValueInputsLevel3Memberus-gaap:OtherLongTermInvestments2025-12-310001921865us-gaap:AccountsReceivableMember2025-01-012025-12-310001921865us-gaap:AdditionalPaidInCapitalMember2025-01-012025-03-310001921865aspi:StockPurchaseAgreementMemberaspi:SkylineBuildersGroupHoldingLtdMemberus-gaap:CommonClassBMember2025-08-290001921865aspi:EastCoastNuclearPharmacyLLCMember2026-01-012026-09-300001921865aspi:NuMedDiagnosticsLLCMemberus-gaap:CommonStockMember2026-01-012026-03-3100019218652025-11-012025-11-300001921865aspi:OtherAssetMember2026-01-012026-09-300001921865us-gaap:SecuredDebtMemberaspi:SBSALoanMember2026-09-300001921865us-gaap:CommonStockMemberaspi:RenergenMember2026-01-062026-01-060001921865us-gaap:CommonStockMember2025-07-012025-09-300001921865us-gaap:ParentMemberaspi:QuantumLeapEnergyLLCMemberaspi:TwoThousandTwentyFiveNotesMember2025-11-012025-11-300001921865us-gaap:AdditionalPaidInCapitalMember2026-03-310001921865us-gaap:FairValueInputsLevel3Member2025-12-310001921865aspi:SeriesSeed1PreferredStockMemberaspi:OpeongoMember2026-01-260001921865aspi:RenergenLimitedMemberus-gaap:AdditionalPaidInCapitalMember2026-01-012026-03-310001921865aspi:CommonStockWarrantsMember2025-09-012025-09-300001921865us-gaap:NoncontrollingInterestMember2025-03-310001921865aspi:HeliumAndLNGMember2025-01-012025-09-300001921865aspi:ClassAUnitsMemberaspi:NobleMemberaspi:MergerAgreementMember2026-06-250001921865us-gaap:SecuredDebtMemberaspi:IDCLoanMember2021-12-202021-12-200001921865us-gaap:FairValueInputsLevel3Memberus-gaap:ConvertibleNotesPayableMember2024-12-310001921865us-gaap:StockOptionMember2026-01-012026-09-300001921865aspi:SpecialistIsotopesAndRelatedServicesMemberus-gaap:ProductMember2025-07-012025-09-300001921865us-gaap:NoncontrollingInterestMember2026-03-310001921865aspi:CreberMiniUnitMemberaspi:One30SevenIncMember2025-10-012025-10-310001921865aspi:ToolsMachineryAndEquipmentMember2026-09-300001921865us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-07-012026-09-300001921865aspi:ToolsMachineryAndEquipmentMembersrt:MinimumMember2026-01-012026-09-300001921865aspi:PETLabsMember2024-01-012024-01-310001921865aspi:CommonStockWarrantsMember2025-05-310001921865aspi:ReservingSixMonthsOfPaymentsToFulfillObligationsUnderTheIDCDebtMember2026-09-300001921865us-gaap:NoncontrollingInterestMember2026-07-012026-09-300001921865us-gaap:TreasuryStockCommonMember2026-04-012026-06-300001921865aspi:NuMedDiagnosticsLLCMemberus-gaap:RetainedEarningsMember2026-01-012026-03-310001921865us-gaap:IPOMember2025-07-012025-09-300001921865us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:OtherLongTermInvestments2025-12-310001921865us-gaap:NoncontrollingInterestMember2026-04-012026-06-300001921865us-gaap:SecuredDebtMemberaspi:IDCLoanMember2026-09-300001921865us-gaap:RetainedEarningsMemberaspi:SkylineBuildersGroupHoldingLtdMember2025-07-012025-09-300001921865aspi:CollaborationRevenueMember2026-01-012026-09-300001921865aspi:GasProcessingAndLiquefactionEquipmentMember2026-09-300001921865us-gaap:WarrantMemberaspi:ENDRALifeSciencesIncMember2026-05-270001921865us-gaap:UnsecuredDebtMember2026-07-012026-09-300001921865aspi:CreditFacilityMember2025-12-310001921865us-gaap:Revenues2023-09-012023-09-300001921865us-gaap:CommonClassAMemberaspi:WarrantAMemberaspi:SkylineBuildersGroupHoldingLtdMemberaspi:SecuritiesPurchaseAgreementMembersrt:MaximumMember2025-08-290001921865aspi:GasProcessingAndLiquefactionEquipmentMember2025-12-310001921865aspi:NuclearFuelsMember2026-09-300001921865us-gaap:NoncontrollingInterestMember2025-01-012025-03-310001921865aspi:VirginiaGasProjectMember2026-09-300001921865us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:ConvertibleNotesPayableMember2025-12-310001921865us-gaap:ConstructionInProgressMember2025-12-310001921865aspi:RenergensObligationMember2026-09-300001921865aspi:PETLabsMember2023-10-012023-10-3100019218652026-07-012026-09-300001921865us-gaap:FairValueInputsLevel3Memberus-gaap:EquityMethodInvestmentsMember2026-09-300001921865aspi:CollaborationRevenueMemberaspi:HeliumAndLNGMember2026-01-012026-09-300001921865us-gaap:ProductMember2025-07-012025-09-300001921865aspi:TwoThousandTwentyFiveInducementEquityIncentivePlanMember2026-09-300001921865aspi:EquityIncentivePlanTwentyTwentyFourMember2024-06-300001921865aspi:AIRSOLMember2026-09-300001921865us-gaap:IPOMember2025-04-012025-06-300001921865aspi:EastCoastNuclearPharmacyLLCMember2026-09-3000019218652025-01-012025-09-300001921865aspi:RenergenLimitedMemberus-gaap:NoncontrollingInterestMember2026-01-012026-03-310001921865us-gaap:UnsecuredDebtMember2025-12-3100019218652026-01-012026-09-300001921865aspi:ClassBUnitsMemberaspi:NobleMemberaspi:MergerAgreementMember2026-06-250001921865aspi:RenergenMember2026-09-300001921865aspi:SharePurchaseAgreementRelatingToPetLabsMember2025-01-012025-12-310001921865aspi:EquityIncentivePlanTwentyTwentyFourMember2026-09-300001921865us-gaap:UnsecuredDebtMemberaspi:AIRSOLMember2023-08-300001921865aspi:ENDRALifeSciencesIncMember2026-09-300001921865country:ZA2026-07-012026-09-300001921865aspi:HDPAndWorkerTrustMember2026-09-300001921865aspi:MotorVehicleAndEquipmentLoansMember2026-09-300001921865aspi:InterestRateThroughMarchSevenTwoThousandTwentyFiveMember2026-01-012026-09-300001921865aspi:OpeongoMember2026-09-300001921865us-gaap:FairValueInputsLevel2Memberus-gaap:ConvertibleNotesPayableMember2026-09-300001921865aspi:MotorVehicleAndEquipmentLoansMember2025-07-012025-09-300001921865aspi:MotorVehicleAndEquipmentLoansMember2025-12-310001921865aspi:SharePurchaseAgreementRelatingToPetLabsMember2026-01-012026-09-300001921865aspi:ReservingAllPaymentsToFulfillObligationsUnderTheSBSALoanMember2026-09-300001921865aspi:SkylineExchangeAgreementMemberaspi:SkylineBuildersGroupHoldingLtdMember2026-09-300001921865aspi:FacilityAgreementMembersrt:MaximumMember2026-01-012026-09-300001921865us-gaap:RetainedEarningsMember2026-07-012026-09-300001921865us-gaap:TreasuryStockCommonMember2026-01-012026-03-310001921865us-gaap:RetainedEarningsMember2025-12-3100019218652025-06-3000019218652026-01-062026-09-300001921865aspi:Tetra4Member2026-09-300001921865us-gaap:RetainedEarningsMemberus-gaap:IPOMember2025-04-012025-06-3000019218652021-10-310001921865aspi:EquityIncentivePlanTwentyTwentyFourMember2024-06-012024-06-300001921865aspi:IsoBioIncMemberaspi:SeriesSeed1PreferredStockMember2025-07-280001921865us-gaap:RestrictedStockUnitsRSUMember2026-09-300001921865us-gaap:PropertyPlantAndEquipmentMembersrt:MinimumMember2026-01-012026-09-300001921865us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-04-012026-06-300001921865us-gaap:NoncontrollingInterestMember2024-12-310001921865us-gaap:AdditionalPaidInCapitalMember2026-09-300001921865aspi:QuantumLeapEnergyLLCMemberaspi:TwoThousandTwentyFiveNotesMember2025-11-300001921865aspi:DevelopedAssetsMember2026-09-300001921865aspi:RenergenLimitedMemberus-gaap:AdditionalPaidInCapitalMember2026-07-012026-09-300001921865aspi:OfficeFurnitureMember2026-09-300001921865us-gaap:StockOptionMember2026-07-012026-09-300001921865aspi:FacilityAgreementMembersrt:MinimumMember2026-01-012026-09-300001921865aspi:UnprovedReservesMember2025-12-310001921865aspi:SkylineBuildersGroupHoldingLtdMemberus-gaap:AdditionalPaidInCapitalMember2025-07-012025-09-300001921865aspi:WellsInProcessMember2026-09-300001921865aspi:MergerAgreementMemberaspi:RenergenMemberaspi:ASPITermLoanFacilityMember2026-06-250001921865aspi:CommonStockWarrantsMember2026-09-300001921865us-gaap:SecuredDebtMember2026-09-300001921865us-gaap:RestrictedStockUnitsRSUMemberaspi:AmericanVenturesAdvisoryAgreementMemberaspi:QuantumLeapEnergyLLCMember2026-01-012026-09-300001921865us-gaap:SegmentDiscontinuedOperationsMemberaspi:SkylineMember2026-01-012026-09-300001921865us-gaap:FairValueInputsLevel3Memberus-gaap:ConvertibleNotesPayableMember2026-01-012026-09-300001921865aspi:OtherAssetMember2025-01-012025-09-300001921865us-gaap:VehiclesMember2026-01-012026-09-300001921865aspi:SkylineBuildersGroupHoldingLtdMember2026-07-012026-09-300001921865us-gaap:SegmentDiscontinuedOperationsMember2026-09-300001921865us-gaap:RetainedEarningsMember2025-07-012025-09-300001921865us-gaap:CommonStockMember2024-12-310001921865aspi:PETLabsMember2025-12-012025-12-310001921865aspi:HeatherKiesslingMember2026-07-012026-09-300001921865aspi:SkylineBuildersGroupHoldingLtdMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2025-07-012025-09-300001921865us-gaap:RestrictedStockUnitsRSUMemberaspi:AmericanVenturesAdvisoryAgreementMemberaspi:QuantumLeapEnergyLLCMemberus-gaap:ShareBasedCompensationAwardTrancheOneMember2025-10-312025-10-310001921865us-gaap:ConvertibleNotesPayableMember2026-09-300001921865us-gaap:SegmentDiscontinuedOperationsMemberaspi:SkylineMember2025-01-012025-09-300001921865aspi:RenergenLimitedMemberus-gaap:TreasuryStockCommonMember2026-04-012026-06-300001921865country:US2025-07-012025-09-300001921865country:US2026-07-012026-09-300001921865us-gaap:CommonClassAMemberaspi:PrefundedWarrantMemberaspi:SecuritiesPurchaseAgreementMemberaspi:SkylineBuildersGroupHoldingLtdMember2025-08-290001921865aspi:TwoThousandTwentyFiveNotesMember2025-11-012025-11-300001921865us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-09-300001921865us-gaap:CommonStockMember2025-06-300001921865aspi:RenergenLimitedMember2026-09-300001921865aspi:TerraPowerLoanAgreementMember2026-01-012026-09-3000019218652026-01-060001921865aspi:RenergenMember2023-09-012023-09-300001921865us-gaap:FairValueInputsLevel3Memberus-gaap:USTreasurySecuritiesMember2025-12-310001921865aspi:One30SevenIncMemberaspi:MidiAndMaxiMember2025-10-012025-10-310001921865srt:MinimumMemberaspi:One30SevenIncMemberaspi:MidiAndMaxiMember2025-10-012025-10-310001921865aspi:ToolsMachineryAndEquipmentMember2025-12-310001921865aspi:JulyTwoThousandAndTwentySixMember2026-07-012026-07-310001921865us-gaap:SecuredDebtMemberaspi:IDCLoanMembersrt:MinimumMember2021-12-200001921865aspi:NuMedDiagnosticsLLCMemberus-gaap:TreasuryStockCommonMember2026-01-012026-03-310001921865aspi:SpecialistIsotopesAndRelatedServicesMember2026-01-012026-09-300001921865us-gaap:SegmentDiscontinuedOperationsMemberaspi:SkylineMember2025-12-310001921865aspi:PromissoryNotesOneMember2025-12-310001921865us-gaap:FairValueInputsLevel3Memberus-gaap:OtherLongTermInvestments2026-09-300001921865us-gaap:FairValueInputsLevel2Memberus-gaap:ConvertibleNotesPayableMember2025-12-310001921865us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-12-310001921865us-gaap:IPOMemberus-gaap:NoncontrollingInterestMember2025-07-012025-09-300001921865country:US2026-01-012026-09-300001921865country:ZA2026-01-012026-09-300001921865us-gaap:TreasuryStockCommonMember2025-12-310001921865aspi:OctoberTwoThousandTwentyFiveMember2025-10-012025-10-310001921865aspi:PromissoryNotesMember2026-09-300001921865us-gaap:CommonStockMemberaspi:RenergenLimitedMember2026-01-012026-03-310001921865aspi:SkylineExchangeAgreementMemberus-gaap:CommonClassAMemberaspi:SkylineBuildersGroupHoldingLtdMember2026-03-290001921865us-gaap:RestrictedStockUnitsRSUMemberus-gaap:ShareBasedCompensationAwardTrancheTwoMemberaspi:AmericanVenturesAdvisoryAgreementMemberaspi:QuantumLeapEnergyLLCMember2025-10-312025-10-310001921865us-gaap:NoncontrollingInterestMember2026-09-3000019218652026-08-012026-08-310001921865aspi:ENDRALifeSciencesIncMember2026-01-012026-09-300001921865us-gaap:SecuredDebtMemberaspi:SBSALoanMember2026-07-012026-09-300001921865us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:USTreasurySecuritiesMember2025-12-310001921865us-gaap:FairValueInputsLevel1Member2025-12-310001921865us-gaap:CommonStockMember2025-09-300001921865aspi:TwoThousandAndTwentyTwoEquityIncentivePlanMember2022-11-012022-11-300001921865aspi:EquityIncentivePlanMember2025-01-310001921865us-gaap:AccountsReceivableMember2026-01-012026-09-300001921865aspi:RenergenLimitedMember2026-01-012026-01-3100019218652025-03-310001921865aspi:RenergenFirmIntentionLetterAndLoanAgreementMember2025-05-190001921865aspi:RenergenFirmIntentionLetterAndLoanAgreementMember2026-01-012026-09-300001921865us-gaap:GeneralAndAdministrativeExpense2025-01-012025-09-300001921865aspi:SoftwareMember2025-12-310001921865us-gaap:SecuredDebtMemberaspi:IDCLoanMembersrt:MaximumMember2021-12-200001921865aspi:SoftwareMember2026-09-300001921865us-gaap:ProductMember2026-07-012026-09-300001921865aspi:IsoBioIncMember2026-01-012026-09-300001921865aspi:SpecialistIsotopesAndRelatedServicesMember2025-12-310001921865aspi:ConvertibleNotesMember2026-01-012026-09-300001921865us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-04-012025-06-300001921865aspi:ConstructionServicesSpecialistIsotopesAndRelatedServicesMember2026-09-300001921865aspi:SkylineBuildersGroupHoldingLtdMember2026-09-300001921865aspi:FacilityAgreementMember2026-09-300001921865aspi:ClassBUnitsMemberaspi:NobleMemberaspi:RenergenMember2026-06-252026-06-250001921865aspi:NuMedDiagnosticsLLCMember2026-09-300001921865aspi:NuMedDiagnosticsLLCMember2026-01-310001921865aspi:NuMedDiagnosticsLLCMember2026-01-012026-01-310001921865us-gaap:FairValueInputsLevel1Memberus-gaap:ConvertibleNotesPayableMember2025-12-310001921865us-gaap:SecuredDebtMemberaspi:SBSALoanMember2026-01-012026-09-300001921865us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-03-310001921865us-gaap:ShareBasedCompensationAwardTrancheTwoMemberus-gaap:UnsecuredDebtMemberaspi:AIRSOLMember2024-03-182024-03-180001921865us-gaap:RetainedEarningsMemberaspi:RenergenLimitedMember2026-01-012026-03-310001921865us-gaap:VehiclesMember2026-09-300001921865aspi:PlantAndOfficeBuildingsMember2026-01-012026-09-300001921865us-gaap:SalesRevenueNetMemberaspi:CustomerMemberus-gaap:CustomerConcentrationRiskMember2025-01-012025-09-300001921865aspi:UnprovedReservesMember2026-09-300001921865us-gaap:IPOMemberus-gaap:NoncontrollingInterestMember2025-04-012025-06-300001921865us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-09-300001921865aspi:SpecialistIsotopesAndRelatedServicesMember2026-07-012026-09-300001921865aspi:EastCoastNuclearPharmacyLLCMember2025-10-310001921865us-gaap:AdditionalPaidInCapitalMember2026-04-012026-06-3000019218652026-04-012026-06-300001921865us-gaap:FairValueInputsLevel3Memberus-gaap:ConvertibleNotesPayableMember2026-09-300001921865aspi:SkylineExchangeAgreementMemberaspi:SkylineBuildersGroupHoldingLtdMemberus-gaap:CommonClassBMember2026-03-290001921865aspi:NuMedDiagnosticsLLCMemberus-gaap:AdditionalPaidInCapitalMember2026-01-012026-03-310001921865us-gaap:NonoperatingIncomeExpenseaspi:ENDRALifeSciencesIncMember2026-07-012026-09-300001921865us-gaap:RestrictedStockUnitsRSUMemberaspi:AmericanVenturesLLCMember2025-10-012025-10-310001921865aspi:ClassBUnitsMemberaspi:NobleMemberaspi:MergerAgreementMember2026-06-252026-06-250001921865srt:MaximumMember2026-01-012026-09-300001921865us-gaap:IPOMemberus-gaap:TreasuryStockCommonMember2025-07-012025-09-300001921865us-gaap:FairValueInputsLevel3Member2026-09-300001921865aspi:OctoberTwoThousandTwentyFiveMember2025-10-310001921865aspi:ConstructionServicesSpecialistIsotopesAndRelatedServicesMember2024-12-310001921865us-gaap:ConstructionInProgressMember2025-12-310001921865us-gaap:ConvertibleNotesPayableMember2025-12-310001921865us-gaap:RetainedEarningsMember2025-06-300001921865aspi:OperatingLeasesMember2026-09-300001921865aspi:TerraPowerLoanAgreementMember2026-09-300001921865us-gaap:LandMember2025-12-310001921865aspi:RenergenLimitedMemberus-gaap:TreasuryStockCommonMember2026-07-012026-09-300001921865us-gaap:CommonStockMemberaspi:RenergenLimitedMember2026-04-012026-06-300001921865aspi:StockAwardsMember2025-01-012025-09-300001921865us-gaap:SecuredDebtMemberaspi:IDCLoanMember2021-12-2000019218652026-04-012026-09-300001921865us-gaap:ResearchAndDevelopmentExpense2026-01-012026-09-3000019218652026-06-300001921865us-gaap:NonoperatingIncomeExpenseaspi:ENDRALifeSciencesIncMember2026-01-012026-09-300001921865aspi:CommonStockWarrantsMember2025-12-310001921865us-gaap:RetainedEarningsMember2026-03-310001921865us-gaap:IPOMemberus-gaap:AdditionalPaidInCapitalMember2025-07-012025-09-300001921865aspi:MotorVehicleAndEquipmentLoansMembersrt:MaximumMember2026-01-012026-09-300001921865aspi:PromissoryNotesMember2025-12-310001921865us-gaap:RetainedEarningsMemberaspi:RenergenLimitedMember2026-04-012026-06-3000019218652025-01-012025-03-310001921865us-gaap:LandMember2026-09-300001921865aspi:ConvertibleNotesMember2026-07-150001921865us-gaap:ComputerEquipmentMember2025-12-310001921865aspi:MotorVehicleAndEquipmentLoansMember2026-09-300001921865aspi:RenergenLimitedMember2026-07-012026-09-300001921865aspi:HeliumAndLNGMember2025-12-310001921865us-gaap:StockOptionMember2025-07-012025-09-300001921865us-gaap:UnsecuredDebtMember2026-01-012026-09-300001921865aspi:TerraPowerLoanAgreementMember2025-05-310001921865aspi:ThirdPartyInvestorsMemberaspi:ConvertibleNotesMember2026-07-160001921865us-gaap:CommonStockMember2026-04-012026-06-300001921865srt:MinimumMemberaspi:SoftwareMember2026-01-012026-09-300001921865aspi:PETLabsMember2025-01-012025-01-310001921865aspi:RehabilitationAssetMember2025-12-310001921865us-gaap:FairValueInputsLevel2Memberus-gaap:OtherLongTermInvestments2025-12-310001921865us-gaap:FairValueInputsLevel1Memberus-gaap:OtherLongTermInvestments2025-12-310001921865us-gaap:RetainedEarningsMember2026-06-3000019218652026-01-012026-03-310001921865us-gaap:SecuredDebtMemberaspi:SecondAmendmentMember2026-09-300001921865us-gaap:ConstructionInProgressMember2026-09-300001921865us-gaap:AdditionalPaidInCapitalMember2026-06-300001921865us-gaap:RetainedEarningsMember2025-01-012025-03-310001921865us-gaap:ConstructionInProgressMember2026-09-300001921865aspi:StockAwardsMember2026-09-300001921865us-gaap:NoncontrollingInterestMember2025-06-300001921865aspi:PlantAndOfficeBuildingsMember2025-12-310001921865aspi:FacilityAgreementMember2026-07-012026-09-300001921865us-gaap:RetainedEarningsMember2026-09-300001921865aspi:TwoThousandAndTwentyOneStockIncentivePlanMember2021-10-012021-10-310001921865aspi:TotalSegmentMember2026-07-012026-09-300001921865us-gaap:NoncontrollingInterestMember2025-09-300001921865us-gaap:CarryingReportedAmountFairValueDisclosureMember2026-09-300001921865aspi:RenergenMember2026-01-062026-01-0600019218652025-10-012025-10-310001921865aspi:FacilityAgreementMember2026-01-012026-09-3000019218652023-10-012023-10-310001921865us-gaap:SubsequentEventMemberaspi:RenergenMember2026-10-010001921865aspi:CollaborationRevenueMemberaspi:SpecialistIsotopesAndRelatedServicesMember2026-01-012026-09-3000019218652026-03-310001921865aspi:HeatherKiesslingMember2026-09-300001921865us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-07-012025-09-300001921865us-gaap:FairValueInputsLevel2Memberus-gaap:OtherLongTermInvestments2026-09-300001921865aspi:MolopoLoanActionMember2024-11-300001921865aspi:ENDRALifeSciencesIncMemberus-gaap:CommonStockMember2026-05-270001921865aspi:ConstructionServicesSpecialistIsotopesAndRelatedServicesMemberaspi:NuMedDiagnosticsLLCMember2026-01-012026-09-300001921865aspi:SkylineBuildersGroupHoldingLtdMember2025-07-012025-09-300001921865aspi:ConstructionServicesSpecialistIsotopesAndRelatedServicesMember2026-01-012026-09-300001921865aspi:NuMedDiagnosticsLLCMember2026-01-012026-09-300001921865us-gaap:TreasuryStockCommonMember2026-06-300001921865us-gaap:SalesRevenueNetMemberaspi:CustomerMemberus-gaap:CustomerConcentrationRiskMember2026-01-012026-09-300001921865aspi:NuclearFuelsMember2025-12-310001921865us-gaap:ResearchAndDevelopmentExpense2026-07-012026-09-300001921865aspi:RenergenLimitedMemberaspi:RenergenFirmIntentionLetterAndLoanAgreementMember2025-05-190001921865us-gaap:CommonClassAMemberaspi:SecuritiesPurchaseAgreementMemberaspi:SkylineBuildersGroupHoldingLtdMember2025-08-290001921865us-gaap:WarrantMemberaspi:StockPurchaseAgreementMemberaspi:SkylineBuildersGroupHoldingLtdMember2025-08-290001921865aspi:StockAwardsMember2026-01-012026-09-300001921865us-gaap:LeaseholdImprovementsMember2025-12-310001921865aspi:NuMedDiagnosticsLLCMember2026-01-220001921865aspi:InterestRateAfterMarchSevenTwoThousandTwentyFiveMember2026-01-012026-09-3000019218652026-01-012026-01-310001921865us-gaap:RetainedEarningsMember2025-09-300001921865us-gaap:NoncontrollingInterestMember2025-04-012025-06-300001921865aspi:PETLabsMember2026-01-012026-09-300001921865us-gaap:ComputerEquipmentMember2026-01-012026-09-3000019218652025-01-012025-12-310001921865us-gaap:NoncontrollingInterestMember2025-07-012025-09-300001921865aspi:NuclearFuelsMember2026-07-012026-09-300001921865us-gaap:ComputerEquipmentMember2026-09-300001921865us-gaap:AdditionalPaidInCapitalMember2025-09-300001921865aspi:EquityIncentivePlanMember2026-09-300001921865us-gaap:UnsecuredDebtMember2014-04-110001921865us-gaap:FairValueInputsLevel2Memberus-gaap:USTreasurySecuritiesMember2026-09-300001921865aspi:PromissoryNotesTwoMember2026-09-300001921865us-gaap:CommonStockMember2026-06-300001921865aspi:DevelopedAssetsMember2025-12-3100019218652022-11-300001921865aspi:MotorVehicleAndEquipmentLoansMember2025-12-310001921865us-gaap:IPOMemberus-gaap:AdditionalPaidInCapitalMember2025-04-012025-06-300001921865us-gaap:CarryingReportedAmountFairValueDisclosureMember2025-12-310001921865us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-03-310001921865us-gaap:IPOMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2025-07-012025-09-3000019218652025-08-012026-03-310001921865us-gaap:RetainedEarningsMember2025-04-012025-06-300001921865us-gaap:FairValueInputsLevel1Memberus-gaap:OtherLongTermInvestments2026-09-300001921865aspi:SkylineExchangeAgreementMemberaspi:SkylineBuildersGroupHoldingLtdMemberus-gaap:CommonClassBMember2026-01-012026-09-300001921865us-gaap:RetainedEarningsMember2025-03-310001921865aspi:EastCoastNuclearPharmacyLLCMember2025-10-012025-10-310001921865us-gaap:CommonStockMemberaspi:One30SevenIncMember2025-10-012025-10-310001921865us-gaap:FairValueInputsLevel2Memberus-gaap:USTreasurySecuritiesMember2025-12-310001921865aspi:SharePurchaseAgreementRelatingToPetLabsMember2025-01-012025-01-310001921865aspi:RenergenMember2026-01-060001921865us-gaap:UnsecuredDebtMemberaspi:AIRSOLMember2023-08-302023-08-300001921865aspi:PETLabsMember2026-09-300001921865us-gaap:CommonStockMember2025-04-012025-06-300001921865us-gaap:GasGatheringAndProcessingEquipmentMember2026-09-300001921865us-gaap:LeaseholdImprovementsMember2026-09-300001921865srt:MinimumMemberaspi:MotorVehicleAndEquipmentLoansMember2026-01-012026-09-300001921865aspi:RenergenLimitedMemberus-gaap:NoncontrollingInterestMember2026-07-012026-09-300001921865us-gaap:CarryingReportedAmountFairValueDisclosureMemberus-gaap:EquityMethodInvestmentsMember2026-09-300001921865aspi:One30SevenIncMemberaspi:MidiAndMaxiMembersrt:MaximumMember2025-10-012025-10-310001921865us-gaap:SecuredDebtMemberaspi:IDCLoanMember2026-07-012026-09-300001921865aspi:TerraPowerLoanAgreementMembersrt:MaximumMember2026-09-300001921865us-gaap:CommonClassAMemberaspi:SkylineBuildersGroupHoldingLtdMemberaspi:WarrantAMemberaspi:SecuritiesPurchaseAgreementMember2025-08-290001921865aspi:RenergenLimitedMemberus-gaap:TreasuryStockCommonMember2026-01-012026-03-310001921865aspi:RenergenLimitedMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2026-01-012026-03-310001921865us-gaap:SecuredDebtMemberaspi:SecondAmendmentMember2026-01-012026-09-300001921865aspi:RenergenLimitedMemberus-gaap:AccumulatedOtherComprehensiveIncomeMember2026-07-012026-09-300001921865us-gaap:AdditionalPaidInCapitalMember2024-12-310001921865us-gaap:AdditionalPaidInCapitalMember2025-04-012025-06-3000019218652025-09-3000019218652024-04-040001921865aspi:NuclearFuelsMember2025-01-012025-09-300001921865us-gaap:FairValueInputsLevel3Memberus-gaap:ConvertibleNotesPayableMember2025-12-310001921865aspi:NuclearFuelsMemberus-gaap:ProductMember2025-07-012025-09-300001921865aspi:SkylineBuildersGroupHoldingLtdMemberus-gaap:NoncontrollingInterestMember2025-07-012025-09-300001921865aspi:IsoBioIncMember2025-10-012025-10-310001921865aspi:CustomerMemberus-gaap:AccountsReceivableMemberus-gaap:CustomerConcentrationRiskMember2026-01-012026-09-300001921865aspi:NuclearFuelsMemberus-gaap:ProductMember2026-07-012026-09-300001921865us-gaap:RetainedEarningsMember2026-04-012026-06-300001921865aspi:ConstructionServicesSpecialistIsotopesAndRelatedServicesMemberaspi:EastCoastNuclearPharmacyLLCMember2025-01-012025-12-310001921865aspi:CollaborationRevenueMember2025-01-012025-09-300001921865us-gaap:FairValueInputsLevel2Memberus-gaap:EquityMethodInvestmentsMember2026-09-300001921865us-gaap:RestrictedStockUnitsRSUMember2025-09-012025-09-300001921865us-gaap:AdditionalPaidInCapitalMember2025-12-310001921865us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-01-012026-03-310001921865aspi:JulyTwoThousandTwentyFiveMember2025-07-012025-07-310001921865aspi:QLE2024EquityIncentivePlanMember2026-01-012026-09-300001921865us-gaap:VehiclesMember2025-12-310001921865aspi:RenergenLimitedMember2026-01-012026-03-310001921865us-gaap:ProductMember2025-01-012025-09-300001921865us-gaap:RetainedEarningsMemberaspi:RenergenLimitedMember2026-07-012026-09-3000019218652025-07-012025-09-300001921865srt:MaximumMemberaspi:IsoBioAndSkylinesJointVenturesWithKC-GloryJVKC-GeotechJVAndKC-CRFGJVMember2026-09-300001921865aspi:SkylineExchangeAgreementMemberaspi:SkylineBuildersGroupHoldingLtdMember2026-07-012026-09-300001921865us-gaap:SegmentDiscontinuedOperationsMember2026-07-012026-09-300001921865aspi:MotorVehicleAndEquipmentLoansMember2025-01-012025-09-300001921865aspi:QLE2024EquityIncentivePlanMember2024-03-310001921865aspi:SpecialistIsotopesAndRelatedServicesMember2026-09-300001921865us-gaap:ProductMember2026-01-012026-09-300001921865aspi:NuclearFuelsMemberus-gaap:ProductMember2025-01-012025-09-300001921865us-gaap:CommonStockMemberaspi:SkylineBuildersGroupHoldingLtdMember2025-07-012025-09-300001921865us-gaap:FairValueInputsLevel2Member2025-12-310001921865aspi:SkylineBuildersGroupHoldingLtdMember2026-01-012026-09-300001921865aspi:SixthAddendumToASPITermLoanFacilityMemberaspi:RenergenMember2026-09-300001921865us-gaap:UnsecuredDebtMemberaspi:AIRSOLMember2026-09-300001921865us-gaap:FairValueInputsLevel1Memberus-gaap:ConvertibleNotesPayableMember2026-09-30xbrli:purexbrli:sharesaspi:Segmentiso4217:ZARiso4217:USDxbrli:sharesaspi:Customeraspi:Voteiso4217:USD

 

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, DC 20549

 

 

FORM 10-Q

 

 

(Mark One)

☒

QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the quarterly period ended September 30, 2026

 

OR

 

☐

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the transition period from __________________ to __________________

 

Commission File Number: 001-41555

 

ASP Isotopes Inc.

(Exact Name of Registrant as Specified in its Charter)

 

Delaware

87-2618235

(State or other jurisdiction of

incorporation or organization)

(I.R.S. Employer

Identification No.)

 

2200 Ross Avenue

Suite 4575E

Dallas, TX

75201

(Address of principal executive offices)

(Zip Code)

 

Registrant’s telephone number, including area code: (214) 432-8219

 

Not Applicable

(Former name, former address and former fiscal year, if changed since last report)

 

Securities registered pursuant to Section 12(b) of the Act:

 

Title of each class

Trading Symbol(s)

Name of each exchange on which registered

Common Stock, par value $0.01 per share

ASPI

The Nasdaq Stock Market LLC

 

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ☒ No ☐

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☒ No ☐

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

 

Large accelerated filer

☐

Accelerated filer

☐

Non-accelerated filer

☒

Smaller reporting company

☒

Emerging growth company

☒

 

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes ☐ No ☒

As of November 16, 2026, the registrant had 155,834,430 shares of common stock, $0.01 par value per share, outstanding.

 

 

 


 

Table of Contents

 

 

Page

PART I.

FINANCIAL INFORMATION

 

5

Item 1.

Financial Statements (Unaudited)

 

5

Condensed Consolidated Balance Sheets as of September 30, 2026 and December 31, 2025

 

5

Condensed Consolidated Statements of Operations and Comprehensive Loss for the Three and Nine Month Periods ended September 30, 2026 and 2025

 

6

Condensed Consolidated Statements of Changes in Stockholders’ Equity for the Three and Nine Month Periods ended September 30, 2026 and 2025

 

7

Condensed Consolidated Statements of Cash Flows for the Nine Month Periods ended September 30, 2026 and 2025

 

9

Notes to Unaudited Condensed Consolidated Financial Statements

 

11

Item 2.

Management’s Discussion and Analysis of Financial Condition and Results of Operations

 

39

Item 3.

Quantitative and Qualitative Disclosures About Market Risk

 

53

Item 4.

Controls and Procedures

 

53

 

 

PART II.

OTHER INFORMATION

 

54

Item 1.

Legal Proceedings

 

54

Item 1A.

Risk Factors

 

54

Item 2.

Unregistered Sales of Equity Securities and Use of Proceeds

 

54

Item 3.

Defaults Upon Senior Securities

 

54

Item 4.

Mine Safety Disclosures

 

54

Item 5.

Other Information

 

54

Item 6.

Exhibits

 

56

Signatures

 

57

 

2


 

SPECIAL NOTE REGARDING FORWARD-LOOKING STATEMENTS

This Quarterly Report on Form 10-Q contains “forward-looking statements” within the meaning of the safe harbor provisions of the U.S. Private Securities Litigation Reform Act of 1995. All statements other than statements of historical fact contained in this Quarterly Report on Form 10-Q, including statements regarding our future results of operations and financial position, business strategy and plans and objectives of management for future operations, are forward-looking statements. These statements involve known and unknown risks, uncertainties and other important factors that may cause our actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements.

In some cases, you can identify forward-looking statements by terms such as “may,” “should,” “would,” “expects,” “plans,” “anticipates,” “could,” “intends,” “target,” “projects,” “contemplates,” “believes,” “estimates,” “predicts,” “potential” or “continue” or the negative of these terms or other similar expressions. The forward-looking statements in this Quarterly Report on Form 10-Q are only predictions. We have based these forward-looking statements largely on our current expectations and projections about future events and financial trends that we believe may affect our business, financial condition and results of operations. These forward-looking statements speak only as of the date of this Quarterly Report on Form 10-Q and are subject to a number of risks, uncertainties and assumptions described in the section titled “Risk Factors” and elsewhere in this Quarterly Report on Form 10-Q. Because forward-looking statements are inherently subject to risks and uncertainties, some of which cannot be predicted or quantified, you should not rely on these forward-looking statements as predictions of future events. The events and circumstances reflected in our forward-looking statements may not be achieved or occur and actual results could differ materially from those projected in the forward-looking statements. Some of the key factors that could cause actual results to differ from our expectations include:

•
our ability to achieve or sustain positive cash flows from operations or profitability;
•
our ability to complete the construction of, commission and successfully operate isotope enrichment plants and Phase 2 of the Virginia Gas Project in a cost-effective manner;
•
our ability to meet, and to continue to meet, applicable regulatory requirements for the use of the isotopes we may produce using the ASP technology or the QE technology;
•
our ability to obtain regulatory approvals for the enrichment of uranium and the production and distribution of other isotopes;
•
our ability to comply on an ongoing basis with the numerous regulatory requirements applicable to the ASP technology, the QE technology and our enrichment facilities in South Africa;
•
our ability to execute on various projects and strategic initiatives with potential customers and partners, including our initiative to commence enrichment of uranium in South Africa and to complete development of Phase 2 of the Virginia Gas Project;
•
the success or profitability of our future offtake arrangements with respect to various isotopes that we may produce using ASP technology or the QE technology or with respect to helium or liquified natural gas (“LNG”) we may produce at the Virginia Gas Project;
•
a failure of demand for various isotopes that we may produce using ASP technology or the QE technology or for helium or LNG we produce at the Virginia Gas Project;
•
our future capital requirements and sources and uses of cash, including, without limitation, our outstanding debt obligations;
•
our ability to obtain funding for our operations and future growth;
•
the extensive costs, time and uncertainty associated with new technology development;
•
our ability to implement and maintain effective internal controls;
•
developments and projections relating to our competitors and industry;
•
the ability to recognize the anticipated benefits of acquisitions and investments, including our acquisition of Renergen;
•
our ability to complete the Merger (as defined below) within the anticipated timeframe or at all due to the conditions to the closing of the Merger not being satisfied, including the failure to obtain approval of the Merger from ENDRA Life Sciences Inc.’s stockholders;
•
our ability to realize certain anticipated benefits of the Merger, including with respect to future financial and operating results;
•
problems with the performance of the ASP technology or the QE technology in the enrichment of isotopes;
•
our dependence on a limited number of third-party suppliers for certain components and our inability to obtain third-party providers or contractors to conduct our operations, including with respect to the development of Phase 2 of the Virginia Gas Project;
•
our inability to adapt to changing technology and diagnostic landscapes, such as the emergence of new diagnostic scanners or tracers;
•
our expected dependence on a limited number of key customers for isotopes that we may produce using ASP technology or the QE technology;
•
our inability to protect our intellectual property and the risk of claims asserting that we have infringed on the intellectual property of others;
•
our inability to compete effectively;
•
risks associated with the current economic environment, including any future economic downturn, the impact of inflation or tariffs, disruptions in financial credit and other disruptions resulting from geo-political events such as the Russian invasion of Ukraine, conflicts in the Middle East, including the United States-Israel-Iran war, and trade tensions between the U.S. and China;
•
fluctuations in the market price and demand for LNG, helium and other natural gases and the drivers of such fluctuations;
•
risks associated with our international operations;

3


 

•
our credit counterparty risks;
•
changes in applicable laws or regulations, including alteration, suspension or cancellation of our Exploration Rights and Production Right in South Africa;
•
our inability to manage commodity risks;
•
the highly speculative nature of Renergen’s exploration projects;
•
our inability to adequately protect our technology infrastructure;
•
our inability to hire or retain skilled employees and the loss of any of our key personnel;
•
operational risk;
•
costs and other risks associated with being a reporting company and being subject to the Sarbanes-Oxley Act;
•
our ability to complete the listing of Quantum Leap Energy as a standalone public company; and
•
other factors that are described in “Risk Factors,” on page 54.

These statements relate to future events or to our future financial performance and involve known and unknown risks, uncertainties, and other factors that may cause our actual results, performance, or achievements to be materially different from any future results, performance, or achievements expressed or implied by these forward-looking statements. Factors that may cause actual results to differ materially from current expectations include, among other things, those set forth in Part I, Item 1A - “Risk Factors” in our Annual Report on Form 10-K for the year ended December 31, 2025 (as amended), and other reports that we file with the SEC, including this Quarterly Report on Form 10-Q. Any forward-looking statement in this Quarterly Report on Form 10-Q reflects our current view with respect to future events and is subject to these and other risks, uncertainties, and assumptions relating to our operations, results of operations, industry, and future growth. Given these uncertainties, you should not place undue reliance on these forward-looking statements. Except as required by law, we assume no obligation to update or revise these forward-looking statements for any reason, even if new information becomes available in the future.

This Quarterly Report on Form 10-Q also contains estimates, projections, and other information concerning our industry, our business, and the potential markets for certain isotopes and for helium and LNG, including data regarding the estimated size of those respective markets, their respective projected growth rates, and, in the case of our isotope enrichment platform, the incidence of certain medical conditions. Information that is based on estimates, forecasts, projections, or similar methodologies is inherently subject to uncertainties, and actual events or circumstances may differ materially from events and circumstances reflected in this information. Unless otherwise expressly stated, we obtained these industry, business, market, and other data from reports, research surveys, studies, and similar data prepared by third parties, industry, medical and general publications, government data, and similar sources. In some cases, we do not expressly refer to the sources from which these data are derived.

Note Regarding Company References

Unless the context otherwise requires, references to the “Company,” “our Company,” “ASPI,” “we,” “us” and “our” refer to ASP Isotopes Inc. and its direct and indirect subsidiaries; references to “ASP Isotopes” refer to ASP Isotopes Inc. and not to any of its subsidiaries; references to “QLE” refer to Quantum Leap Energy, LLC; references to “Renergen” refer to Renergen Limited, a public corporation incorporated in 2014 and existing under the South African Companies Act 71 of 2008, as amended, together with its subsidiaries unless the context dictates otherwise; references to “Tetra4” refer to Tetra4 Proprietary Limited; references to “Skyline” refer to Skyline Builders Group Holding Limited, together with its subsidiaries. The terms “dollar,” “USD” or “$” refer to U.S. dollars, and the terms “R,” “ZAR” or “rand” refer to the South African rand.

Trademarks

All trademarks, service marks, and trade names included in this Quarterly Report on Form 10-Q are the property of their respective owners. Solely for convenience, the trademarks and trade names in this report may be referred to without the ® and ™ symbols, but such references should not be construed as any indicator that their respective owners will not assert, to the fullest extent under applicable law, their rights thereto.

4


 

PART I-FINANCIAL INFORMATION

Item 1. Financial Statements.

ASP Isotopes Inc.

Condensed Consolidated Balance Sheets (unaudited)

(in thousands, except share and per share amounts)

 

 

September 30, 2026

 

 

December 31, 2025 *

 

Assets

 

 

 

 

 

 

Current assets:

 

 

 

 

 

 

Cash and cash equivalents

 

$

201,663

 

 

$

279,572

 

Short-term investments

 

 

—

 

 

 

47,745

 

Restricted cash

 

 

19,121

 

 

 

—

 

Accounts receivable

 

 

3,273

 

 

 

1,078

 

Inventories

 

 

1,522

 

 

 

1,098

 

Note receivable

 

 

—

 

 

 

32,005

 

Deferred offering costs

 

 

135

 

 

 

1,782

 

Prepaid expenses and other current assets

 

 

10,814

 

 

 

4,949

 

Current assets of discontinued operations

 

 

—

 

 

 

31,690

 

Total current assets

 

 

236,528

 

 

 

399,919

 

Property and equipment, net

 

 

41,726

 

 

 

33,291

 

Natural gas properties, net

 

 

196,126

 

 

 

—

 

Operating lease right-of-use assets, net

 

 

5,417

 

 

 

1,464

 

Intangible assets

 

 

594

 

 

 

409

 

Goodwill

 

 

6,461

 

 

 

5,177

 

Lease receivable - noncurrent

 

 

3,997

 

 

 

426

 

Restricted cash - noncurrent

 

 

1,761

 

 

 

—

 

Equity method investments

 

 

23,005

 

 

 

—

 

Other investments

 

 

20,241

 

 

 

5,580

 

Other noncurrent assets

 

 

2,273

 

 

 

866

 

Noncurrent assets of discontinued operations

 

 

—

 

 

 

50,888

 

Total assets

 

$

538,129

 

 

$

498,020

 

 

 

 

 

 

 

 

Liabilities and stockholders’ equity

 

 

 

 

 

 

Current liabilities:

 

 

 

 

 

 

Accounts payable

 

$

9,570

 

 

$

3,814

 

Accrued expenses

 

 

8,950

 

 

 

4,414

 

Debt - current

 

 

47,690

 

 

 

584

 

Finance lease liabilities – current

 

 

157

 

 

 

167

 

Operating lease liabilities – current

 

 

928

 

 

 

544

 

Deferred revenue

 

 

882

 

 

 

882

 

Other current liabilities

 

 

496

 

 

 

501

 

Current liabilities of discontinued operations

 

 

—

 

 

 

21,790

 

Total current liabilities

 

 

68,673

 

 

 

32,696

 

Deferred tax liabilities

 

 

8,923

 

 

 

—

 

Convertible notes payable, at fair value

 

 

85,860

 

 

 

199,323

 

Debt - noncurrent

 

 

5,268

 

 

 

1,471

 

Finance lease liabilities – noncurrent

 

 

335

 

 

 

471

 

Operating lease liabilities – noncurrent

 

 

4,763

 

 

 

1,059

 

Deferred revenue - noncurrent

 

 

818

 

 

 

—

 

Other noncurrent liabilities

 

 

4,200

 

 

 

—

 

Noncurrent liabilities of discontinued operations

 

 

—

 

 

 

102

 

Total liabilities

 

 

178,840

 

 

 

235,122

 

Commitments and contingencies (Note 11)

 

 

 

 

 

 

Stockholders’ equity

 

 

 

 

 

 

Preferred stock, $0.01 par value; 10,000,000 shares authorized, no shares issued
   and outstanding as of September 30, 2026 and December 31, 2025

 

 

—

 

 

 

—

 

Common stock, $0.01 par value; 500,000,000 shares authorized, 156,002,704 shares issued and 155,834,430 shares outstanding as of September 30, 2026 and 111,677,771 shares issued and outstanding as of December 31, 2025

 

 

1,558

 

 

 

1,117

 

Treasury stock at cost

 

 

2

 

 

 

—

 

Additional paid-in capital

 

 

649,007

 

 

 

431,757

 

Accumulated deficit

 

 

(303,629

)

 

 

(231,265

)

Accumulated other comprehensive income

 

 

2,365

 

 

 

2,542

 

Total stockholders’ equity attributed to ASP Isotopes Inc. stockholders

 

 

349,303

 

 

 

204,151

 

Noncontrolling interests in consolidated subsidiaries

 

 

9,986

 

 

 

58,747

 

Total stockholders’ equity

 

 

359,289

 

 

 

262,898

 

Total liabilities and stockholders’ equity

 

$

538,129

 

 

$

498,020

 

* Reclassified to reflect discontinued operations presentation.

 

The accompanying notes are an integral part of these condensed consolidated financial statements.

5


 

ASP Isotopes Inc.

Condensed Consolidated Statements of Operations and Comprehensive Loss (unaudited)

(in thousands, except share and per share amounts)

 

 

Three Months Ended September 30,

 

 

Nine Months Ended September 30,

 

 

2026

 

 

2025*

 

 

2026

 

 

2025*

 

Revenue

 

 

 

 

 

 

 

 

 

 

 

 

Product revenue

 

$

5,124

 

 

$

1,271

 

 

$

13,627

 

 

$

3,571

 

Collaboration revenue

 

 

—

 

 

 

—

 

 

 

800

 

 

 

—

 

Total revenue

 

 

5,124

 

 

 

1,271

 

 

 

14,427

 

 

 

3,571

 

Cost of revenue

 

 

4,331

 

 

 

1,029

 

 

 

10,487

 

 

 

2,430

 

Gross profit

 

 

793

 

 

 

242

 

 

 

3,940

 

 

 

1,141

 

Operating expenses:

 

 

 

 

 

 

 

 

 

 

 

 

Research and development

 

 

7,236

 

 

 

3,098

 

 

 

19,324

 

 

 

5,508

 

Selling, general and administrative

 

 

34,072

 

 

 

12,131

 

 

 

84,214

 

 

 

30,541

 

Total operating expenses

 

 

41,308

 

 

 

15,229

 

 

 

103,538

 

 

 

36,049

 

Loss from operations

 

 

(40,515

)

 

 

(14,987

)

 

 

(99,598

)

 

 

(34,908

)

Other (expense) income:

 

 

 

 

 

 

 

 

 

 

 

 

Foreign exchange transaction loss

 

 

(511

)

 

 

(15

)

 

 

(1,610

)

 

 

(113

)

Change in fair value of share liability

 

 

—

 

 

 

(71

)

 

 

—

 

 

 

(200

)

Change in fair value of convertible notes payable

 

 

164

 

 

 

173

 

 

 

(3,863

)

 

 

(64,542

)

Change in fair value of equity investments

 

 

(988

)

 

 

—

 

 

 

138

 

 

 

—

 

Gain on extinguishment of convertible notes

 

 

11,250

 

 

 

—

 

 

 

11,250

 

 

 

—

 

Interest income

 

 

4,333

 

 

 

1,844

 

 

 

10,091

 

 

 

3,283

 

Interest expense

 

 

(3,481

)

 

 

(76

)

 

 

(6,984

)

 

 

(245

)

Total other income (expense)

 

 

10,767

 

 

 

1,855

 

 

 

9,022

 

 

 

(61,817

)

Loss before income tax expense

 

 

(29,748

)

 

 

(13,132

)

 

 

(90,576

)

 

 

(96,725

)

Income tax expense

 

 

(1,120

)

 

 

(52

)

 

 

(991

)

 

 

(77

)

Net loss from continuing operations

 

 

(30,868

)

 

 

(13,184

)

 

 

(91,567

)

 

 

(96,802

)

Income from discontinued operations, net of taxes

 

 

—

 

 

 

290

 

 

 

19,585

 

 

 

290

 

Net loss

 

 

(30,868

)

 

 

(12,894

)

 

 

(71,982

)

 

 

(96,512

)

Less: Net loss attributable to noncontrolling interests

 

 

(497

)

 

 

(277

)

 

 

(1,149

)

 

 

(387

)

Net loss attributable to ASP Isotopes Inc. shareholders

 

$

(30,371

)

 

$

(12,617

)

 

$

(70,833

)

 

$

(96,125

)

Net (loss) income per share, basic and diluted

 

 

 

 

 

 

 

 

 

 

 

 

Continuing operations

 

$

(0.22

)

 

$

(0.15

)

 

$

(0.71

)

 

$

(1.27

)

Discontinued operations

 

$

—

 

 

$

—

 

 

$

0.15

 

 

$

—

 

Attributable to ASP Isotopes Inc. shareholders

 

$

(0.21

)

 

$

(0.14

)

 

$

(0.55

)

 

$

(1.27

)

Weighted average shares of common stock outstanding,
   basic and diluted

 

 

143,385,783

 

 

 

88,552,309

 

 

 

128,891,373

 

 

 

75,985,507

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Comprehensive loss:

 

 

 

 

 

 

 

 

 

 

 

 

Net loss before allocation to noncontrolling interests

 

$

(30,868

)

 

$

(12,894

)

 

$

(71,982

)

 

$

(96,512

)

Foreign currency translation

 

 

(301

)

 

 

916

 

 

 

(1,673

)

 

 

3,115

 

Less: reclassification to earnings

 

 

—

 

 

 

—

 

 

 

1,496

 

 

 

—

 

Total comprehensive loss before allocation to noncontrolling interests

 

 

(31,169

)

 

 

(11,978

)

 

 

(72,159

)

 

 

(93,397

)

Less: Comprehensive (loss) income attributable to noncontrolling interests

 

 

(213

)

 

 

(145

)

 

 

(827

)

 

 

151

 

Total comprehensive loss

 

$

(30,956

)

 

$

(11,833

)

 

$

(71,332

)

 

$

(93,548

)

* Reclassified to reflect discontinued operations presentation.

 

The accompanying notes are an integral part of these condensed consolidated financial statements.

6


 

ASP Isotopes Inc.

Condensed Consolidated Statements of Changes in Stockholders’ Equity (unaudited)

(in thousands, except share and per share amounts)

 

 

Common Stock

 

 

Treasury

 

 

Additional
Paid-in

 

 

Accumulated
Other
Comprehensive

 

 

Accumulated

 

 

Noncontrolling

 

 

Total Stockholders'

 

 

Shares

 

 

Amount

 

 

Shares

 

 

Stock

 

 

Capital

 

 

(Loss) Income

 

 

Deficit

 

 

Interests

 

 

Equity

 

Balance as of December 31, 2025

 

 

111,677,771

 

 

$

1,117

 

 

 

—

 

 

$

—

 

 

$

431,757

 

 

$

2,542

 

 

$

(231,265

)

 

$

58,747

 

 

$

262,898

 

Issuance of common stock to acquire Renergen

 

 

14,270,000

 

 

 

142

 

 

 

—

 

 

 

—

 

 

 

92,755

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

92,897

 

Forfeiture of restricted common stock

 

 

(44,324

)

 

 

—

 

 

 

44,324

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

Stock-based compensation expense

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

4,412

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

4,412

 

Deconsolidation of subsidiary

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(9

)

 

 

—

 

 

 

(86,774

)

 

 

(86,783

)

Fair value of noncontrolling interest at acquisition of Numed

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

597

 

 

 

597

 

Fair value of noncontrolling interest at acquisition of Renergen

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

7,276

 

 

 

7,276

 

Distribution to noncontrolling interest of Renergen

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(380

)

 

 

—

 

 

 

(380

)

Contributions from noncontrolling interest

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

26,960

 

 

 

26,960

 

Distribution to noncontrolling interest of VIE

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(257

)

 

 

(257

)

Foreign currency translation

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(6,688

)

 

 

—

 

 

 

429

 

 

 

(6,259

)

Reclassification to earnings

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

1,496

 

 

 

(1,496

)

 

 

—

 

 

 

—

 

Net loss - continuing operations

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(26,463

)

 

 

(243

)

 

 

(26,706

)

Gain on deconsolidation

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

20,832

 

 

 

—

 

 

 

20,832

 

Net income - discontinued operations

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

249

 

 

 

3,281

 

 

 

3,530

 

Balance as of March 31, 2026

 

 

125,903,447

 

 

$

1,259

 

 

 

44,324

 

 

$

—

 

 

$

528,924

 

 

$

(2,659

)

 

$

(238,523

)

 

$

10,016

 

 

$

299,017

 

Issuance of common stock from exercise of options

 

 

62,766

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

139

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

139

 

Issuance of restricted common stock

 

 

4,273,555

 

 

 

43

 

 

 

—

 

 

 

—

 

 

 

(43

)

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

Forfeiture/cancellation of restricted common stock

 

 

(91,070

)

 

 

(1

)

 

 

87,500

 

 

 

1

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

Distribution to noncontrolling interest of Renergen

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(729

)

 

 

—

 

 

 

(729

)

Stock-based compensation expense

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

4,542

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

4,542

 

Distribution to noncontrolling interest of VIE

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(215

)

 

 

(215

)

Foreign currency translation

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

5,325

 

 

 

—

 

 

 

704

 

 

 

6,029

 

Net loss

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(33,585

)

 

 

(408

)

 

 

(33,993

)

Balance as of June 30, 2026

 

 

130,148,698

 

 

$

1,301

 

 

 

131,824

 

 

$

1

 

 

$

533,562

 

 

$

2,666

 

 

$

(272,837

)

 

$

10,097

 

 

$

274,790

 

Issuance of restricted common stock

 

 

2,550,000

 

 

 

26

 

 

 

—

 

 

 

—

 

 

 

(26

)

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

Issuance of common stock for convertible notes

 

 

23,160,682

 

 

 

232

 

 

 

—

 

 

 

—

 

 

 

105,845

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

106,077

 

Forfeiture/cancellation of restricted common stock

 

 

(36,450

)

 

 

(1

)

 

 

36,450

 

 

 

1

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

Issuance of common stock from cashless exercise of options

 

 

11,500

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

23

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

23

 

Stock-based compensation expense

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

9,603

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

9,603

 

Distribution to noncontrolling interest of Renergen

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(421

)

 

 

—

 

 

 

(421

)

Distribution to noncontrolling interest of VIE

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(70

)

 

 

(70

)

Foreign currency translation

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(301

)

 

 

—

 

 

 

456

 

 

 

155

 

Net loss

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(30,371

)

 

 

(497

)

 

 

(30,868

)

Balance as of September 30, 2026

 

 

155,834,430

 

 

$

1,558

 

 

 

168,274

 

 

$

2

 

 

$

649,007

 

 

$

2,365

 

 

$

(303,629

)

 

$

9,986

 

 

$

359,289

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The accompanying notes are an integral part of these condensed consolidated financial statements.

 

7


 

ASP Isotopes Inc.

Condensed Consolidated Statements of Changes in Stockholders’ Equity (unaudited)

(in thousands, except share and per share amounts)

 

 

Common Stock

 

 

 

 

 

Treasury

 

 

Additional
Paid-in

 

 

Accumulated
Other
Comprehensive

 

 

Accumulated

 

 

Noncontrolling

 

 

Total Stockholders'

 

 

Shares

 

 

Amount

 

 

Shares

 

 

Stock

 

 

Capital

 

 

(Loss) Income

 

 

Deficit

 

 

Interests

 

 

Equity

 

Balance as of December 31, 2024

 

 

72,068,059

 

 

$

721

 

 

 

—

 

 

$

—

 

 

$

105,515

 

 

$

(2,164

)

 

$

(56,173

)

 

$

3,268

 

 

 

51,167

 

Stock-based compensation expense

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

1,890

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

1,890

 

Distribution to noncontrolling interest of VIE

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(38

)

 

 

(38

)

Foreign currency translation

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

1,171

 

 

 

—

 

 

 

—

 

 

 

1,171

 

Net loss

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(8,446

)

 

 

(16

)

 

 

(8,462

)

Balance as of March 31, 2025

 

 

72,068,059

 

 

$

721

 

 

 

—

 

 

$

—

 

 

$

107,405

 

 

$

(993

)

 

$

(64,619

)

 

$

3,214

 

 

$

45,728

 

Issuance of common stock from public offering, net of issuance costs of $3,238,630

 

 

7,518,797

 

 

 

75

 

 

 

—

 

 

 

—

 

 

 

46,686

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

46,761

 

Issuance of common stock from exercise of warrants

 

 

1,294,778

 

 

 

13

 

 

 

—

 

 

 

—

 

 

 

4,902

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

4,915

 

Issuance of restricted common stock

 

 

2,923,783

 

 

 

29

 

 

 

—

 

 

 

—

 

 

 

(29

)

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

Settlement of liabilities with consultant

 

 

100,000

 

 

 

1

 

 

 

—

 

 

 

—

 

 

 

652

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

653

 

Stock-based compensation expense

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

4,429

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

4,429

 

Distribution to noncontrolling interest of VIE

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(41

)

 

 

(41

)

Foreign currency translation

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

1,023

 

 

 

—

 

 

 

—

 

 

 

1,023

 

Net loss

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(75,063

)

 

 

(94

)

 

 

(75,157

)

Balance as of June 30, 2025

 

 

83,905,417

 

 

$

839

 

 

 

—

 

 

$

—

 

 

$

164,045

 

 

$

30

 

 

$

(139,682

)

 

$

3,079

 

 

$

28,311

 

Issuance of common stock from public offering, net of issuance costs of $3,693,950

 

 

7,500,000

 

 

 

75

 

 

 

—

 

 

 

—

 

 

 

56,231

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

56,306

 

Issuance of common stock from cashless exercise of warrants

 

 

123,497

 

 

 

1

 

 

 

—

 

 

 

—

 

 

 

(1

)

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

Issuance of common stock from cashless exercise of options

 

 

1,337,245

 

 

 

13

 

 

 

—

 

 

 

—

 

 

 

(13

)

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

Issuance of restricted common stock

 

 

510,470

 

 

 

5

 

 

 

—

 

 

 

—

 

 

 

(5

)

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

Stock-based compensation expense

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

4,484

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

4,484

 

Fair value of noncontrolling interest at acquisition of Skyline

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

19,762

 

 

 

19,762

 

Distribution to noncontrolling interest of VIE

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(324

)

 

 

(324

)

Foreign currency translation

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

921

 

 

 

—

 

 

 

38

 

 

 

959

 

Net loss - continuing operations

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

(12,907

)

 

 

(277

)

 

 

(13,184

)

Net income - discontinued operations

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

—

 

 

 

33

 

 

 

257

 

 

 

290

 

Balance as of September 30, 2025*

 

 

93,376,629

 

 

$

933

 

 

 

—

 

 

$

—

 

 

$

224,741

 

 

$

951

 

 

$

(152,556

)

 

$

22,535

 

 

$

96,604

 

 

* Reclassified to reflect discontinued operations presentation.

 

The accompanying notes are an integral part of these condensed consolidated financial statements.

 

 

8


 

ASP Isotopes Inc.

Condensed Consolidated Statements of Cash Flows (unaudited)

(in thousands)

 

 

Nine Months Ended September 30,

 

 

2026

 

 

2025*

 

Cash flows from Operating activities

 

 

 

 

 

 

Net loss

 

$

(71,982

)

 

$

(96,512

)

Adjustments to reconcile net loss to cash used in operating activities:

 

 

 

 

 

 

Income from discontinued operations

 

 

(249

)

 

 

(290

)

Foreign exchange transaction loss from intercompany

 

 

1,678

 

 

 

—

 

Depreciation, depletion and amortization

 

 

5,977

 

 

 

907

 

Gain on deconsolidation

 

 

(19,336

)

 

 

—

 

Gain on sale of property and equipment

 

 

(58

)

 

 

—

 

Noncash write-off of capitalized costs

 

 

569

 

 

 

—

 

Non cash interest income on note receivable

 

 

—

 

 

 

(1,189

)

Non cash interest expense on debt

 

 

4,116

 

 

 

—

 

Stock-based compensation

 

 

18,557

 

 

 

10,803

 

Shares issued for non-cash consultant expense

 

 

—

 

 

 

673

 

Change in fair value of share liability

 

 

—

 

 

 

200

 

Gain on extinguishment of convertible notes payable

 

 

(11,250

)

 

 

—

 

Change in fair value of convertible notes payable

 

 

3,863

 

 

 

64,542

 

Change in fair value of equity investments

 

 

(138

)

 

 

—

 

Change in right-of-use lease asset

 

 

768

 

 

 

427

 

Non-cash lease income

 

 

(337

)

 

 

(45

)

Change in deferred taxes

 

 

736

 

 

 

33

 

Changes in operating assets and liabilities, net of acquisition amounts:

 

 

 

 

 

 

Accounts receivable

 

 

(1,623

)

 

 

6

 

Receivable from noncontrolling interest

 

 

—

 

 

 

28

 

Inventories

 

 

(263

)

 

 

(697

)

Prepaid expenses and other current assets

 

 

(728

)

 

 

1,688

 

Other noncurrent assets

 

 

(1,407

)

 

 

1,187

 

Accounts payable

 

 

4,461

 

 

 

(30

)

Accrued expenses

 

 

1,172

 

 

 

339

 

Operating lease liabilities

 

 

(633

)

 

 

(435

)

Other current liabilities

 

 

216

 

 

 

(777

)

Other noncurrent liabilities

 

 

563

 

 

 

—

 

Net cash used in operating activities – continuing operations

 

 

(65,328

)

 

 

(19,142

)

Cash used in operating activities – discontinued operations

 

 

(1,121

)

 

 

(793

)

Net cash used in operating activities

 

 

(66,449

)

 

 

(19,935

)

Cash flows from investing activities

 

 

 

 

 

 

Purchases of property and equipment

 

 

(13,573

)

 

 

(7,255

)

Purchases of short-term investments

 

 

(35,425

)

 

 

—

 

Proceeds from maturity of short-term investments

 

 

83,170

 

 

 

—

 

Principal collections from lease receivable

 

 

447

 

 

 

—

 

Proceeds from sale of property and equipment

 

 

123

 

 

 

—

 

Purchase of equity investments

 

 

(14,067

)

 

 

(5,000

)

Cash received (paid) for acquisition of business, net of cash paid

 

 

4,919

 

 

 

(2,500

)

Cash disposed of upon deconsolidation of subsidiary

 

 

(44,708

)

 

 

(8,943

)

Cash advance in exchanges for note receivable

 

 

—

 

 

 

(30,000

)

Net cash used in investing activities – continuing operations

 

 

(19,114

)

 

 

(53,698

)

Net cash provided by investing activities – discontinued operations

 

 

—

 

 

 

9,143

 

Net cash used in investing activities

 

 

(19,114

)

 

 

(44,555

)

Cash flows from financing activities

 

 

 

 

 

 

Proceeds from issuance of common stock

 

 

—

 

 

 

110,000

 

Payment of common stock issuance costs

 

 

(135

)

 

 

(6,933

)

Proceeds from exercise of warrants

 

 

—

 

 

 

4,915

 

Proceeds from exercise of options

 

 

162

 

 

 

—

 

Distribution to noncontrolling interest in VIE

 

 

(542

)

 

 

(404

)

Distribution to noncontrolling interest of Renergen

 

 

(1,530

)

 

 

—

 

Proceeds from issuance of debt

 

 

54

 

 

 

307

 

Payment of principal portion of debt

 

 

(9,653

)

 

 

(883

)

Payment of principal portion of finance leases

 

 

(177

)

 

 

(95

)

Net cash (used in) provided by financing activities – continuing operations

 

 

(11,821

)

 

 

106,907

 

Cash provided by financing activities – discontinued operations

 

 

45,886

 

 

 

578

 

Net cash provided by financing activities

 

 

34,065

 

 

 

107,485

 

Net change in cash, cash equivalents and restricted cash

 

 

(51,498

)

 

 

42,995

 

Effect of exchange rate changes on cash, cash equivalents and restricted cash

 

 

(5,529

)

 

 

114

 

Cash, cash equivalents and restricted cash - beginning of period

 

 

279,572

 

 

 

61,890

 

Cash, cash equivalents and restricted cash - end of period

 

$

222,545

 

 

$

104,999

 

Components of cash, cash equivalents, and restricted cash

 

 

 

 

 

 

Cash and cash equivalents

 

$

201,663

 

 

$

104,999

 

Restricted cash

 

 

20,882

 

 

 

—

 

Total cash, cash equivalents, and restricted cash

 

$

222,545

 

 

$

104,999

 

* Reclassified to reflect discontinued operations presentation.

 

The accompanying notes are an integral part of these condensed consolidated financial statements.

9


 

ASP Isotopes Inc.

Condensed Consolidated Statements of Cash Flows (unaudited)

(in thousands)

 

 

Supplemental cash flow information:

 

 

 

 

 

 

Cash paid for Interest

 

$

3,175

 

 

$

—

 

Supplemental disclosures of non-cash investing and financing activities:

 

 

 

 

 

 

Derecognition of asset as a result of sales-type lease

 

$

1,689

 

 

$

370

 

Lease receivable

 

$

1,689

 

 

$

393

 

Purchase of property and equipment included in accounts payable

 

$

207

 

 

$

219

 

Purchase of property and equipment with bank loans

 

$

54

 

 

$

—

 

Right-of-use asset obtained in exchange for operating lease liability

 

$

4,675

 

 

$

114

 

Right-of-use asset obtained in exchange for finance lease liability

 

$

114

 

 

$

48

 

Common stock issued in acquisition of Renergen

 

$

92,897

 

 

$

—

 

Consideration relating to obligated purchase for acquisition of Numed

 

$

358

 

 

$

—

 

Issuance of common stock for the purchase of QLE convertible notes

 

$

106,076

 

 

$

—

 

 

The accompanying notes are an integral part of these condensed consolidated financial statements.

 

 

10


 

ASP Isotopes Inc.

Notes to Unaudited Condensed Consolidated Financial Statements

1. Organization

Description of Business

ASP Isotopes Inc. was incorporated in the state of Delaware on September 13, 2021 and has its headquarters in Dallas, Texas. ASP Isotopes Inc., its subsidiaries and ASP Rentals (Pty) Ltd ("ASP Rentals") are collectively referred to as “the Company” throughout these condensed consolidated financial statements.

The Company is an advanced materials company dedicated to the development of a differentiated isotope enrichment platform to strengthen global supply chain access to critical materials used in nuclear medicine, next-generation semiconductors, and nuclear energy. Our proprietary enrichment technologies, the Aerodynamic Separation Process (“ASP technology”) and Quantum Enrichment technology (“QE technology”), are designed to enable the production of isotopes for a range of industrial and advanced technology applications. Our initial focus is on the production and commercialization of enriched Carbon-14 (“C-14”), Silicon-28 (“Si-28”) and Ytterbium-176 (“Yb-176”). The Company's commercial radiodiagnostic activities are currently focused on radiopharmaceutical products used in positron emission tomography ("PET") and single-photon emission computed tomography ("SPECT") imaging, as well as therapeutic radiopharmaceuticals used in the treatment of oncology indications.

Quantum Leap Energy LLC (“QLE”), the Company's subsidiary, is currently pursuing an initiative to apply its enrichment technologies to the enrichment of Uranium-235 (“U-235”) in South Africa. The Company believes that the U-235 QLE may produce has the potential to be commercialized as a nuclear fuel component for use in the new generation of high-assay low-enriched uranium (“HALEU”)-fueled small modular reactors that are now under development for commercial and government uses. In furtherance of the Company's uranium enrichment initiative, in October 2024, the Company entered into a term sheet with TerraPower, LLC (“TerraPower”) which contemplates the parties entering into definitive agreements pursuant to which TerraPower would provide funding for the construction of a HALEU production facility and agree to purchase all HALEU produced at the facility over a 10-year period after the planned completion of the facility. In addition, in November 2024, the Company entered into a memorandum of understanding with The South African Nuclear Energy Corporation (“Necsa”), a South African state-owned company responsible for undertaking and promoting research and development in the field of nuclear energy and radiation sciences, to collaborate on the research, development and ultimately the commercial production of advanced nuclear fuels. As part of the collaboration contemplated by the MOU with Necsa, QLE’s South African subsidiary has entered into a Pre-Implementation Services Contract Agreement (“Services Contract”) with Necsa, pursuant to which Necsa has agreed to provide to QLE’s South African subsidiary certain facilities, infrastructure, utilities and services related to the siting, design, construction, commission and operation of an enrichment facility on the Necsa site in Pelindaba. See the section captioned “TerraPower” below (Note 13) for disclosures regarding certain definitive agreements entered into between TerraPower and us and/or the Company's subsidiaries, including a term loan subject to conditions to support construction of a new uranium enrichment facility at Pelindaba, South Africa and supply agreements for the future supply of HALEU to TerraPower, as a customer.

QLE acquired a controlling interest in Skyline in August 2025. Skyline is a holding company, and its operations are conducted through its wholly owned operating subsidiaries, Kin Chiu Engineering Limited and Kin Chiu Development Company Limited. Operations primarily consist of construction activities which include public civil engineering works, such as road and drainage works, in Hong Kong. Skyline mostly undertakes civil engineering works in the role as a subcontractor but is fully qualified to undertake such works in the capacity of a main contractor. QLE intends to pursue opportunities to acquire assets in the critical materials supply chain.

QLE entered into the Securities Exchange Agreement (the "Exchange Agreement") with a third party, effective as of March 29, 2026, which resulted in the deconsolidation of Skyline (Note 21). QLE retained approximately 8.6% percent of the outstanding Class A ordinary and preferred shares of Skyline immediately following deconsolidation.

The Company acquired Renergen in January 2026. Renergen is South Africa’s leading onshore natural gas explorer and the first integrated producer of both liquid helium and LNG, both of which are produced from the natural gas reserve base that underpins Renergen’s natural gas development project (the “Virginia Gas Project”). The Virginia Gas Project includes (i) the liquefaction of natural gas into LNG, (ii) the separation of helium from natural gas, and (iii) the further liquefaction of helium into 99.999% pure liquid helium. This liquefaction and separation takes place at Renergen’s natural gas processing plant in the Free State Province of South Africa. Renergen’s principal asset is its 94.5% equity ownership in Tetra4, which holds an onshore petroleum production right and is the entity developing and operating the Virginia Gas Project.

Liquidity

The Company has incurred net losses and negative cash flows from operating activities since its inception. The Company incurred net losses from continuing operations of $91.6 million and $96.8 million for the nine months ended September 30, 2026 and 2025, respectively, and negative cash flows from operations of $66.4 million and $19.9 million for the nine months ended September 30, 2026 and 2025. The Company currently expects that its cash and cash equivalents of $201.7 million as of September 30, 2026, will be sufficient to fund its operating expenses and capital requirements for more than 12 months from the date the financial statements are issued.

There can be no assurance that the Company will achieve or sustain positive cash flows from operations or profitability. The Company anticipates it will need to continue to raise capital through additional equity and/or debt financings and/or collaborative development agreements to fund its operations. However, such funding may not be available on a timely basis on terms acceptable to the Company, or at all. If the Company is unable to raise additional capital when required or on acceptable terms, the Company may be required to scale back or discontinue the advancement of product candidates, reduce headcount, reorganize, merge with another entity, or cease operations.

2. Basis of Presentation and Summary of Significant Accounting Policies

Unaudited Financial Information

The Company’s unaudited condensed consolidated financial statements included herein have been prepared in conformity with accounting principles generally accepted in the United States of America ("U.S. GAAP"), and pursuant to the rules and regulations of the Securities and Exchange Commission, or SEC. In the Company’s opinion, the information furnished reflects all adjustments, all of which are of a normal and recurring nature, necessary for a fair presentation of the financial position and results of operations for the reported interim periods. The Company considers events or transactions that occur after the balance sheet date but before the financial statements are issued to provide additional evidence relative to certain estimates or to identify matters that require additional disclosure.

11


 

The results of operations for interim periods are not necessarily indicative of results to be expected for the full year or any other interim period. These unaudited condensed consolidated financial statements should be read in conjunction with the audited financial statements and related notes for the year ended December 31, 2025.

Basis of Presentation and Use of Estimates

The Company’s condensed consolidated financial statements are prepared in accordance with U.S. GAAP. The preparation of the Company’s condensed consolidated financial statements requires management to make estimates and assumptions that impact the reported amounts of assets, liabilities and expenses and disclosure in the Company’s condensed consolidated financial statements and accompanying notes. The most significant estimates in the Company’s condensed consolidated financial statements relate to stock-based compensation, fair value of convertible notes, equity and other investments, gas reserves, provisions for environmental rehabilitation, loss contingencies and the accounting for acquisitions, including goodwill. Although these estimates are based on the Company’s knowledge of current events and actions it may undertake in the future, actual results may materially differ from these estimates and assumptions.

The Company has reclassified certain prior-year amounts to conform to the current-year’s presentation. The accounting requirements for reporting the separation of Skyline as a discontinued operation were met when the deconsolidation was completed on March 29, 2026. Accordingly, the historical results of Skyline are presented as discontinued operations and, as such, have been excluded from continuing operations and segment results for all periods presented. Refer to Note 21, “Discontinued Operations,” for additional information.

Principles of consolidation

The Company’s condensed consolidated financial statements include the accounts of ASP Isotopes Inc., its wholly-owned subsidiaries, the 80% owned Enlightened Isotopes (PTY) Ltd (“Enlightened Isotopes”), the 60% owned Numed Diagnostics, LLC ("Numed"), the 51% owned PET Labs Pharmaceuticals Proprietary Limited (“PET Labs”), the 94.5% owned Tetra4, and the 42% owned VIE ASP Rentals Proprietary Limited (“ASP Rentals”). All intercompany balances and transactions have been eliminated in consolidation.

Currency and currency translation

The condensed consolidated financial statements are presented in U.S. dollars, the Company’s reporting currency. The functional currency of ASP Isotopes Inc. and ASP Guernsey is the U.S. dollar. The functional currency of the Company’s subsidiaries ASP South Africa, Quantum Leap Energy South Africa and Renergen is the South African Rand. The functional currency of the 80% owned Enlighted Isotopes, the 51% owned PET Labs and the 42% owned VIE ASP Rentals is the South African Rand. The functional currency of the previously consolidated Skyline Builders Group Holding Limited (“Skyline”) is the Hong Kong Dollar. Adjustments that arise from exchange rate changes on transactions of each group entity denominated in a currency other than the functional currency are included in other income and expense in the condensed consolidated statements of operations and comprehensive loss. Assets and liabilities of the entities with functional currency of South African Rand or Hong Kong Dollar are recorded in South African Rand or Hong Kong Dollar, respectively, and translated into the U.S. dollar reporting currency of the Company at the exchange rate on the balance sheet date. Revenue and expenses of the entities with functional currency of South African Rand or Hong Kong Dollar are recorded in South African Rand or Hong Kong Dollar, respectively, and translated into the U.S. dollar reporting currency of the Company at the average exchange rate prevailing during the reporting period. Resulting translation adjustments are recorded separately in stockholders’ equity as a component of accumulated other comprehensive (loss) income.

Concentration of Credit Risk and other Risks

Cash balances are maintained at U.S. financial institutions and may exceed the Federal Deposit Insurance Corporation (“FDIC”) insurance limit of $250,000 per depositor, per insured bank for each account ownership category. Although the Company currently believes that the financial institutions with whom it does business will be able to fulfill their commitments to the Company, there is no assurance that those institutions will be able to continue to do so. The Company has not experienced any credit losses associated with its balances in such accounts for the nine months ended September 30, 2026 and 2025.

The Company's foreign subsidiaries held cash of approximately $28.0 million and $3.6 million as of September 30, 2026 and December 31, 2025, respectively, which is included in cash and cash equivalents, restricted cash and restricted cash - noncurrent on the condensed consolidated balance sheets. The Company's strategic plan does not require the repatriation of foreign cash in order to fund its operations in the U.S., and it is the Company's current intention to indefinitely reinvest its foreign cash outside of the U.S. If the Company were to repatriate foreign cash to the U.S., the Company would be required to accrue and pay U.S. taxes in accordance with applicable U.S. tax rules and regulations as a result of the repatriation.

The Company is potentially subject to concentrations of credit risk in accounts receivable. There was one customer in the Helium and LNG segment representing $0.4 million or 11% of accounts receivable in the condensed consolidated balance sheets as of September 30, 2026. There were no customers representing more than 10% of accounts receivable in the condensed consolidated balance sheets as of December 31, 2025.

Although the Company is directly affected by the financial condition of its customers, management does not believe significant credit risks existed as of September 30, 2026. Generally, the Company does not require customers to post collateral or other securities to support our associated accounts receivable.

There was one customer in the Helium and LNG segment representing $2.1 million, or 16%, of the Company's condensed consolidated product revenues for the nine months ended September 30, 2026. There were no customers representing more than 10% of the Company's condensed consolidated revenues for the nine months ended September 30, 2025.

Cash and Cash Equivalents

The Company considers all highly liquid investments with original maturities at the date of purchase of three months or less to be cash equivalents. Cash and cash equivalents are stated at fair value and may include money market funds, U.S. Treasury and U.S. government-sponsored agency securities, corporate debt, commercial paper and certificates of deposit. The Company had cash equivalents totaling $187.5 million and $267.4 million as of September 30, 2026 and December 31, 2025, respectively.

12


 

Restricted Cash

Restricted cash represents cash balances that are legally or contractually restricted as to withdrawal or use. Restricted cash is classified as current or noncurrent on the condensed consolidated balance sheet based on the nature and expected timing of the underlying restriction. Amounts classified as restricted cash are excluded from cash and cash equivalents and are disclosed separately on the balance sheet. As of September 30, 2026, the Company had current restricted cash of $14.0 million related to reserving all payments to fulfill obligations under the SBSA Loan (defined below), $2.9 million related to reserving six months of payments to fulfill obligations under the DFC Credit Facility (defined below) and $1.3 million related to reserving six months of payments to fulfill obligations under the IDC Loan (defined below). Refer to note 9, “Debt,” for additional information. Additionally, the Company had current restricted cash of $0.9 million for a secured letter of credit in lieu of a lease deposit for premises QLE occupies in Austin, Texas. As of September 30, 2026, the Company had noncurrent restricted cash of $1.2 million related to Renergen's obligation to manage the negative environmental impact associated with its operational activities and $0.5 million related to electricity payments and early termination guaranties with a public utility company.

Fair Value of Financial Instruments

Accounting guidance defines fair value, establishes a consistent framework for measuring fair value, and expands disclosure for each major asset and liability category measured at fair value on either a recurring or nonrecurring basis. Fair value is defined as an exit price, representing the amount that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants. As such, fair value is a market-based measurement that should be determined based on assumptions that market participants would use in pricing an asset or liability. As a basis for considering such assumptions, the accounting guidance establishes a three-tier fair value hierarchy, which prioritizes the inputs used in measuring fair value as follows:

Level 1: Observable inputs such as quoted prices in active markets;

Level 2: Inputs, other than the quoted prices in active markets, that are observable either directly or indirectly; and

Level 3: Unobservable inputs in which there is little or no market data, which require the reporting entity to develop its own assumptions.

The Company’s convertible notes payable (Note 9) is measured as a Level 3 fair value on a recurring basis.

 

Equity Method and Other Investments

The Company accounts for investments in entities over which it has significant influence, but not control, using the equity method of accounting in accordance with ASC Topic 323, Investments - Equity Method and Joint Ventures ("ASC 323"). Significant influence is generally presumed when the Company owns 20% to 50% of the voting interests in the investee, unless other factors indicate otherwise.

Under the equity method, the Company has elected the fair value option, under which it initially recorded the investment at fair value and subsequently adjusts the carrying amount to reflect its share of the investee’s earnings or losses, which are recognized in the condensed consolidated statements of operations and comprehensive loss. Dividends received from equity method investees reduce the carrying amount of the investment. The Company evaluates its equity method investments for impairment whenever events or changes in circumstances indicate that the carrying amount may not be recoverable. Alternatively, the Company may elect to utilize the fair value option. The Company's equity method investments include the Company's investment in Skyline utilizing the fair value option.

The Company also holds investments in equity securities without readily determinable fair values. These investments are accounted for under the measurement alternative in accordance with ASC Topic 321, Investments - Equity Securities ("ASC 321"), which allows the Company to record the investments at cost, less impairments, plus or minus observable price changes in orderly transactions for the identical or similar investment. The Company's investments recorded at cost include IsoBio, Inc. ("IsoBio") and Opeongo, Inc. ("Opeongo").

If the Company determines that an impairment is other-than-temporary, it recognizes a loss equal to the difference between the investment’s carrying amount and its fair value. Equity method investments and investments at cost are included in “Equity method investments” and "Other investments", respectively, on the condensed consolidated balance sheet.

Accounts Receivable

Accounts receivable are stated at the amount management expects to collect from outstanding balances. An allowance for expected credit losses is estimated for those accounts receivable considered to be uncollectible based upon historical experience and management's evaluation of outstanding accounts receivable. The Company maintains an allowance for expected credit losses for accounts receivable, which is recorded as an offset to accounts receivable, and changes in such are classified as selling, general and administrative expense in the condensed consolidated statements of operations and comprehensive loss. The Company assesses collectability by reviewing accounts receivable on a collective basis where similar characteristics exist and on an individual basis when the Company identifies specific customers with known disputes or collectability issues. In determining the amount of the allowance for expected credit losses, the Company considers historical collectability based on past due status and make judgments about the creditworthiness of customers based on ongoing credit evaluations. The Company also considers customer-specific information and current market conditions. Bad debts are written off against the allowance when identified. As of September 30, 2026 and December 31, 2025 there was no allowance for expected credit losses.

Inventories

Inventories are stated at the lower of cost or net realizable value. Cost is determined using the first in, first out inventory method. Inventory cost includes materials, labor, and applicable overhead incurred in bringing the inventories to their present location and condition. Net realizable value represents the estimated selling price in the ordinary course of business, less reasonably predictable costs of completion, disposal, and transportation. Inventories are primarily located in facilities in South Africa and are not pledged as collateral for any debt arrangements

13


 

The components of inventories as of September 30, 2026 and December 31, 2025 were as follows (in thousands):

 

 

September 30,
2026

 

 

December 31,
2025

 

Raw material

 

$

677

 

 

$

484

 

Work in process

 

 

726

 

 

 

614

 

Finished goods

 

 

119

 

 

 

—

 

Total inventories

 

$

1,522

 

 

$

1,098

 

No significant write-downs to net realizable value or reversals of write-downs occurred in the three and nine months ended September 30, 2026 and 2025.

Property and Equipment

Property and equipment include costs of assets constructed, purchased or leased under a finance lease, related delivery and installation costs and interest incurred on significant capital projects during their construction periods. Expenditures for renewals and betterments also are capitalized, but expenditures for normal repairs and maintenance are expensed as incurred. Costs associated with yearly planned major maintenance are generally deferred and amortized over 12 months or until the same major maintenance activities must be repeated, whichever is shorter. The cost and accumulated depreciation applicable to assets retired or sold are removed from the respective accounts, and gains or losses thereon are included in the statement of operations and comprehensive loss.

The Company assigns the useful lives of its property and equipment based upon its internal engineering estimates, which are reviewed periodically. The estimated useful lives of the Company's property and equipment range from 3 to 10 years, or the shorter of the useful life or remaining life of the lease for leasehold improvements. Depreciation for all assets other than Renergen’s gas exploration and gas gathering assets is recorded using the straight-line method. Depreciation for Renergen’s gas exploration and gas gathering assets is recorded using the units of production method.

Construction in progress (Note 6) is carried at cost and consists of specifically identifiable direct and indirect development and construction costs. While under construction, costs of the property are included in construction in progress until the property is placed in service, at which time costs are transferred to the appropriate property and equipment account, including, but not limited to, leasehold improvements or other such accounts.

Business Combination and Asset Acquisitions

The Company evaluates acquisitions of assets and other similar transactions to assess whether or not the transaction should be accounted for as a business combination or asset acquisition by first applying a screen to determine if substantially all of the fair value of the gross assets acquired is concentrated in a single identifiable asset or group of similar identifiable assets. If the screen is met, the transaction is accounted for as an asset acquisition. If the screen is not met, further determination is required as to whether or not the Company has acquired inputs and processes that have the ability to create outputs, which would meet the requirements of a business. If determined to be a business combination, the Company accounts for the transaction under the acquisition method of accounting in accordance with ASC Topic 805, Business Combinations ("ASC 805"), which requires the acquiring entity in a business combination to recognize the fair value of all assets acquired, liabilities assumed, and any non-controlling interest in the acquiree and establishes the acquisition date as the fair value measurement point. Accordingly, the Company recognizes assets acquired and liabilities assumed in business combinations, including contingent assets and liabilities, and non-controlling interest in the acquiree based on the fair value estimates as of the date of acquisition. In accordance with ASC 805, the Company recognizes and measures goodwill as of the acquisition date, as the excess of the fair value of the consideration paid over the fair value of the identified net assets acquired.

The consideration for the Company’s business acquisitions may include future payments that are contingent upon the occurrence of a particular event or events. The obligations for such contingent consideration payments are recorded at fair value on the acquisition date. The contingent consideration obligations are then evaluated each reporting period. Changes in the fair value of contingent consideration, other than changes due to payments, are recognized as a gain or loss and recorded within change in the fair value of deferred and contingent consideration liabilities in the condensed consolidated statements of operations and comprehensive loss.

If determined to be an asset acquisition, the Company accounts for the transaction under ASC 805-50, which requires the acquiring entity in an asset acquisition to recognize assets acquired and liabilities assumed based on the cost to the acquiring entity on a relative fair value basis, which includes transaction costs in addition to consideration given. No gain or loss is recognized as of the date of acquisition unless the fair value of non-cash assets given as consideration differs from the assets’ carrying amounts on the acquiring entity’s books. Consideration transferred that is non-cash will be measured based on either the cost (which shall be measured based on the fair value of the consideration given) or the fair value of the assets acquired and liabilities assumed, whichever is more reliably measurable. Goodwill is not recognized in an asset acquisition and any excess consideration transferred over the fair value of the net assets acquired is allocated to the identifiable assets based on relative fair values.

Contingent consideration payments in asset acquisitions are recognized when the contingency is resolved and the consideration is paid or becomes payable (unless the contingent consideration meets the definition of a derivative, in which case the amount becomes part of the basis in the asset acquired). Upon recognition of the contingent consideration payment, the amount is included in the cost of the acquired asset or group of assets.

Goodwill and Identifiable Intangible Assets

Goodwill represents the amount of consideration paid in excess of the fair value of net assets acquired as a result of the Company’s business acquisitions accounted for using the acquisition method of accounting. Identifiable intangible assets recognized in conjunction with acquisitions are recorded at fair value. Significant unobservable inputs are used to determine the fair value of the identifiable intangible assets based on the income approach valuation model, whereby the present worth and anticipated future benefits of the identifiable intangible assets are discounted back to their net present value.

Goodwill and identifiable intangible assets with indefinite lives are not amortized and are subject to impairment testing at a reporting unit level on an annual basis or when a triggering event occurs that may indicate the carrying value of the goodwill or identifiable intangible assets are impaired. An entity is permitted to first assess qualitative factors to determine if a quantitative impairment test is necessary. Further testing is only required if the entity determines, based on the qualitative assessment, that it is more likely than not that the fair value of the reporting unit is less than its carrying amount. The Company performs its annual test for goodwill or identifiable intangible assets as of October 31.

14


 

Identifiable intangible assets with definite lives are amortized over their estimated useful lives, ranging from 4 to 5 years. The Company's intangible assets include trademarks and customer-related intangible assets related to the East Coast Nuclear Pharmacy ("ECNP") and Numed acquisitions. The Company uses the straight-line method of amortization for identifiable intangible assets with definite lives.

Natural Gas Producing Activities

Effective January 6, 2026, the Company consolidates Renergen Limited and its subsidiaries, including Tetra4 Proprietary Limited, which holds South Africa’s first onshore petroleum production right. The Company’s natural gas producing activities are located entirely in South Africa (Free State Province). The Company follows the successful efforts method of accounting for its natural gas producing activities. Under this method, property acquisition costs and development costs are capitalized when incurred and depleted on a units-of-production basis over the remaining life of proved reserves and proved developed reserves, respectively. Unproved reserve assets and the related costs are transferred to proved reserve assets when proved reserves are found, or otherwise attributed to, the property.

The Company initially capitalizes exploratory well costs pending a determination whether proved reserves have been found. If proved reserves are found, costs remain capitalized; if no proved reserves are found or a well is uneconomic, costs are charged to expense. Other exploration costs, including geological and geophysical costs, are expensed as incurred. Costs to operate and maintain wells and field equipment are expensed as incurred.

Proved reserve assets and proved developed assets are assessed for impairment whenever events or changes in circumstances indicate that the carrying amount may not be recoverable, in accordance with ASC 360, Property, Plant and Equipment. As of September 30, 2026, no impairment indicators were identified with respect to Renergen’s proved properties.

The Company performs periodic assessments of unproved properties for impairment and recognizes a loss at the time of impairment. In determining whether an unproved property is impaired, the Company considers numerous factors including, but not limited to, current development and exploration drilling plans, favorable or unfavorable exploration activity on adjacent lands, and in-house geologists’ evaluation of the reservoir. As of September 30, 2026, no impairment indicators were identified with respect to Renergen’s unproved properties.

Impairment of Long-lived Assets

Long-lived assets consist primarily of property and equipment. The Company reviews long-lived assets for impairment whenever events or changes in circumstances indicate the carrying amount of an asset is not recoverable. Recoverability of assets to be held and used is measured by a comparison of the carrying amount of an asset to the future undiscounted net cash flows expected to be generated by the asset. If such assets are considered to be impaired, the impairment to be recognized is measured as the amount by which the carrying amount of the asset exceeds the fair value of the assets. The Company did not recognize any impairment losses for the three and nine months ended September 30, 2026 or 2025.

Asset Retirement Obligations

The Company accounts for legal obligations associated with the retirement of its natural gas properties in accordance with ASC 410-20, Asset Retirement and Environmental Obligations. An asset retirement obligation ("ARO") is recognized at fair value in the period in which it is incurred and when a reasonable estimate of fair value can be made. Upon initial recognition, the fair value of the ARO is capitalized as part of the carrying amount of the related long-lived asset (the "rehabilitation asset") and included in property and equipment, net, in the condensed consolidated balance sheets.

The ARO is measured at the present value of estimated future cash flows required to satisfy the retirement obligation, discounted at a credit-adjusted risk-free rate that reflects current market assessments of the time value of money and the risks specific to the liability. In subsequent periods, the liability is increased for the passage of time through accretion expense, which is recognized within cost of revenue. Revisions to the timing or amount of estimated future cash flows result in an adjustment to both the carrying amount of the ARO liability and the related rehabilitation asset.

The Company has production and exploration rights on land in South Africa. A rehabilitation obligation of $3.8 million has been recognized in other noncurrent liabilities with respect to the retirement of the Virginia Gas Project assets as of September 30, 2026. This obligation encompasses costs estimated to be incurred to address the following: disturbed infrastructure areas; existing production wells and all exploration wells; general surface rehabilitation; monitoring; and latent/residual environmental risk related to resealing wells.

The ARO was recognized at fair value on the acquisition date discounted at a pre-tax rate of 9.51% per annum, reflecting South African market conditions as of January 6, 2026. The capitalized rehabilitation asset of $3.6 million (included in natural gas properties, net) is depreciated on a basis consistent with the unit-of-production depletion of the underlying proved properties.

Revenue Recognition

The Company recognizes revenue in accordance with Accounting Standard Codification ("ASC") Topic 606, Revenue from Contracts with Customers (“ASC 606”). Under ASC 606, an entity recognizes revenue when its customer obtains control of promised goods or services, in an amount that reflects the consideration which the entity expects to receive in exchange for those goods or services. To determine the appropriate amount of revenue to be recognized for arrangements determined to be within the scope of ASC 606, the Company performs the following five steps: (i) identification of the promised goods or services in the contract; (ii) determination of whether the promised goods or services are performance obligations including whether they are distinct in the context of the contract; (iii) measurement of the transaction price, including the constraint on variable consideration; (iv) allocation of the transaction price to the performance obligations; and (v) recognition of revenue when (or as) the Company satisfies each performance obligation. The Company only applies the five-step model to contracts when it is probable that the entity will collect consideration it is entitled to in exchange for the goods or services it transfers to the customer.

The Company evaluates a transaction’s performance obligations to determine if promised goods or services in a contract to transfer a distinct good or service to the customer and are considered distinct when (i) the customer can benefit from the good or service on its own or together with other readily available resources and (ii) the promised good or service is separately identifiable from other promises in the contract. In assessing whether promised goods or services are distinct, the Company considers whether the goods or services are integral or dependent to other goods or services in the contract. The Company determines the transaction price based on the agreed government rates for the promised goods in the contract. The consideration is recognized as revenue when control is transferred for the related goods.

15


 

The Company enters into revenue generating transactions with certain customers that include payment for delivery of nuclear medical doses from its radiopharmacies in South Africa and the U.S. for PET and SPECT scanning. Revenue from its radiopharmacies is recognized upon delivery.

The Company’s collaboration revenue relates to TerraPower LLC ("TerraPower") (Note 13). At contract execution, the Company analyzes its collaborative arrangements and license agreements to assess whether both parties are active participants in the activities and are exposed to significant risks and rewards and therefore are within the scope of ASC 808, Collaborative arrangements (“ASC 808”). ASC 808 does not address the recognition and measurement of payments from collaborative arrangements and instead refers companies to use other authoritative accounting literature. For collaboration arrangements within the scope of ASC 808 that contain multiple elements, the Company first determines which elements of the collaboration reflect a vendor-customer relationship and therefore are within the scope of ASC 606, Revenue from Contracts with Customers. When the Company determines elements of a collaboration agreement do not reflect a vendor-customer relationship, the Company consistently applies a reasonable and rational policy election made by analogizing to authoritative accounting literature. The Company evaluates the income statement classification for presentation of amounts due from or owed to other participants in a collaboration arrangement based on the nature of each separate activity. The Company recognizes collaboration revenue from TerraPower as contractual deliverables are provided and the related performance obligations are satisfied. Amounts received in advance of performance are recorded as deferred revenue and recognized as revenue when the associated services or deliverables are transferred to the collaborator.

In January 2026, the Company acquired Renergen (Note 14). Renergen explores, produces and sells LNG in South Africa. Revenue from the sale of LNG is recognized upon delivery to the specified destination agreed to in the contract.

When consideration is received from a customer prior to transferring goods or services to the customer under the terms of long-term contracts, a token liability is recorded. The Company classifies these token liabilities within “Deferred revenue - noncurrent” on the Company’s condensed consolidated balance sheets since they have no expiration date. Token contract liabilities are recognized as revenue after control of the goods and services is transferred to the customer and all revenue recognition criteria have been met. The token liability was $0.8 million as of September 30, 2026.

Recently Issued Accounting Pronouncements

The Company has reviewed recently issued accounting pronouncements and plans to adopt those that are applicable to it. The Company does not expect the adoption of any recently issued pronouncements to have a material impact on its results of operations or financial position.

In November 2024, the FASB issued ASU 2024-03, Disaggregation of Income Statement Expenses (“ASU 2024-03”) and is effective for annual reporting periods beginning after December 15, 2026 and interim reporting periods beginning after December 15, 2027. ASU 2024-03 requires disclosures about specific types of expenses included in the expense captions presented on the face of the income statement as well as disclosures about selling expenses. The Company is still assessing the impact of adopting this standard.

In August 2025, the FASB issued ASU 2025-08, Financial Instruments—Credit Losses (Topic 326): Purchased Loans (“ASU 2024-08”) and is effective for fiscal years beginning after December 15, 2026, including interim periods within those fiscal years with early adoption permitted. ASU 2025-08 clarifies the accounting for purchased loans under the current expected credit loss (CECL) model, including guidance on recognizing and measuring expected credit losses and presentation of related amounts. The Company is still assessing the impact of adopting this standard.

In September 2025, the FASB issued ASU 2025-06, Targeted Improvements to the Accounting for Internal-Use Software ("ASU 2025-06") and is effective January 1, 2028 with early adoption permitted. ASU 2025-06 modernizes the accounting for internal use software costs and requires entities to start capitalizing eligible costs when (1) management has authorized and committed to funding the software project, and (2) it is probable that the project will be completed and the software will be used to perform the function intended. The guidance can be applied on a prospective basis, a modified basis for in-process projects, or a retrospective basis. The Company is still assessing the impact of adopting this standard.

3. Short-term Investments

The Company had no held-to-maturity investments as of September 30, 2026. A summary of the Company’s held-to-maturity investments as of December 31, 2025 consisted of the following (in thousands):

 

 

Year Ended December 31, 2025

 

 

 

Amortized Cost

 

 

Unrealized Gains

 

 

Unrealized Losses

 

 

Fair Value

 

U.S. Treasury securities - mature April 2026

 

$

47,745

 

 

$

32

 

 

$

—

 

 

$

47,777

 

Total

 

$

47,745

 

 

$

32

 

 

$

—

 

 

$

47,777

 

There is no allowance for credit losses in short-term investments as of September 30, 2026 and December 31, 2025.

4. Fair Value Measurements

The Company classified its U.S. Treasury securities (Note 3) within Level 2 because their fair values are determined using alternative pricing sources or models that utilized market observable inputs. The Company’s convertible notes payable (Note 9) is measured as a Level 3 fair value on a recurring basis and was $85.9 million and $199.3 million as of September 30, 2026 and December 31, 2025, respectively.

The Company holds an equity investment in IsoBio. The Company originally measured the investment at cost. In October 2025, IsoBio completed a preferred stock financing with unrelated third‑party investors. The transaction represented an observable price change for an identical or other similar equity security held by the Company. Accordingly, the Company remeasured the investment to fair value and recorded an unrealized gain of $0.6 million within Other income (expense). No further observable price changes have been identified. The resulting carrying value of the IsoBio investment is $5.6 million as of September 30, 2026 and December 31, 2025. Because the valuation incorporates significant unobservable inputs, the investment is classified as a Level 3 fair value measurement.

The Company holds an equity investment in Opeongo. The Company measured the investment at cost and no observable price changes were identified. The carrying value of the Opeongo investment is $10.0 million as of September 30, 2026. Because the valuation incorporates significant unobservable inputs, the investment is classified as a Level 3 fair value measurement.

16


 

The Company holds an equity investment in ENDRA Life Sciences, Inc. ("ENDRA"), consisting of common stock, pre-funded common stock warrants and common stock warrants. The Company measured the investment at fair value. The original carrying amount recorded in May 2026 was $3.8 million. The carrying amount was adjusted by $0.9 million for the three and nine months ended September 30, 2026, resulting in a total carrying value of the ENDRA investment of $4.7 million as of September 30, 2026. Because the valuation of the common stock and prefunded warrants incorporates observable inputs, that portion of the investment is classified as a Level 1 fair value measurement. Because the valuation of the common warrants incorporates significant unobservable inputs, that portion of the investment is classified as a Level 3 fair value measurement.

The Company holds an equity investment in Skyline. The Company measured the investment under the equity method and recorded the investment at $23.8 million as a result of the deconsolidation of Skyline during the first quarter of 2026. The Company has elected to account for the retained interest in Skyline under the fair value option (“FVO”). The carrying amount of the Skyline investment was $23.0 million as of September 30, 2026. The Company recognized an expense related to the change in fair value of investment of $1.9 million and $0.7 million for the three and nine months ended September 30, 2026. Because the valuation incorporates observable inputs, the investment is classified as a Level 1 fair value measurement.

There were no transfers among Level 1, Level 2 or Level 3 categories in the three months ended September 30, 2026. The carrying amounts of accounts payable, accrued expenses and debt are considered to be representative of their respective fair values because of the short-term nature of those instruments.

A summary of the assets and liabilities that are measured at fair value as of September 30, 2026 and December 31, 2025 is as follows (in thousands):

 

 

 

September 30, 2026

 

 

 

Carrying Value

 

 

Quoted Price in Active Markets for Identical Assets (Level 1)

 

 

Significant Other Observable Inputs (Level 2)

 

 

Significant Unobservable Inputs (Level 3)

 

Assets:

 

 

 

 

 

 

 

 

 

 

 

 

U.S. Treasury securities

 

$

—

 

 

$

—

 

 

$

—

 

 

$

—

 

Equity method investments

 

 

23,005

 

 

 

23,005

 

 

 

—

 

 

 

—

 

Other investments (ASC 321)

 

 

20,241

 

 

 

3,446

 

 

 

—

 

 

 

16,795

 

Total

 

$

43,246

 

 

$

26,451

 

 

$

—

 

 

$

16,795

 

Liabilities:

 

 

 

 

 

 

 

 

 

 

 

 

Convertible notes payable

 

 

85,860

 

 

 

—

 

 

 

—

 

 

 

85,860

 

Total

 

$

85,860

 

 

$

—

 

 

$

—

 

 

$

85,860

 

 

 

 

December 31,
2025

 

 

 

Carrying Value

 

 

Quoted Price in Active Markets for Identical Assets (Level 1)

 

 

Significant Other Observable Inputs (Level 2)

 

 

Significant Unobservable Inputs (Level 3)

 

Assets:

 

 

 

 

 

 

 

 

 

 

 

 

U.S. Treasury securities

 

$

47,745

 

 

$

—

 

 

$

47,745

 

 

$

—

 

Other investments (ASC 321)

 

 

5,580

 

 

 

—

 

 

 

—

 

 

 

5,580

 

Total

 

$

53,325

 

 

$

—

 

 

$

47,745

 

 

$

5,580

 

Liabilities:

 

 

 

 

 

 

 

 

 

 

 

 

Convertible notes payable

 

 

199,323

 

 

 

—

 

 

 

—

 

 

 

199,323

 

Total

 

$

199,323

 

 

$

—

 

 

$

—

 

 

$

199,323

 

The following table provides a reconciliation of the Company’s liabilities measured as a Level 3 at fair value on a recurring basis using significant unobservable inputs (in thousands):

 

 

Convertible
Notes Payable

 

Balance as of December 31, 2024

 

$

33,433

 

Fair value at issuance

 

 

42,171

 

Fair value adjustment

 

 

123,719

 

Balance as of December 31, 2025

 

 

199,323

 

Issuance of common stock for convertible notes

 

 

(117,326

)

Fair value adjustment

 

 

3,863

 

Balance as of September 30, 2026

 

$

85,860

 

 

5. Revenue and Segment Information

In connection with the Company's acquisitions of 51% ownership of PET Labs in October 2023, 100% ownership of ECNP in October 2025 and 60% ownership of Numed in January 2026, the Company manufactures and sells nuclear medical doses for PET and SPECT scanning in South Africa and the U.S. Beginning in the first quarter of 2026, primarily as a result of the acquisition of Renergen and the deconsolidation of Skyline, the Company has three operating segments: (i) nuclear fuels, (ii) specialist isotopes and related services, and (iii) helium and LNG. The Company’s prior “construction services” segment is shown below as “discontinued operations.”

17


 

The following table presents revenue from continuing operations disaggregated by geography based on the Company’s locations (in thousands):

 

 

Revenues

 

 

 

Three Months Ended September 30,

 

 

Nine Months Ended September 30,

 

Segment

 

2026

 

 

2025

 

 

2026

 

 

2025

 

South Africa

 

$

3,331

 

 

$

1,271

 

 

$

9,358

 

 

$

3,571

 

United States

 

 

1,793

 

 

—

 

 

 

5,069

 

 

—

 

Total Revenue

 

$

5,124

 

 

$

1,271

 

 

$

14,427

 

 

$

3,571

 

The following table presents changes in the Company’s accounts receivable for the nine months ended September 30, 2026 (in thousands):

 

 

Balance as of
December 31,
2025

 

 

Additions (a)

 

 

Deductions

 

 

Balance as of
September 30,
2026

 

Accounts receivable

 

$

1,078

 

 

$

17,002

 

 

$

(14,807

)

 

$

3,273

 

(a)
The Company assumed accounts receivable as part of the Numed and Renergen acquisitions totaling $0.2 million and $3.2 million, respectively (Note 14).

Segment Information

Beginning in 2024, primarily as a result of increased business activities of its subsidiary, Quantum Leap Energy LLC, the Company had two operating segments: (i) specialist isotopes, and related services and (ii) nuclear fuels. Beginning in August 2025, primarily as a result of the acquisition of Skyline, the Company had three operating segments: (i) specialist isotopes and related services, (ii) nuclear fuels, and (iii) construction services. In January 2026, the Company acquired Renergen, which is an integrated producer of both liquid helium and LNG, which comprises the helium and LNG segment. As mentioned above, in late March 2026, the Company entered into the Exchange Agreement and completed the deconsolidation of Skyline. The Company retained approximately 8.6% of the outstanding Class A ordinary and preferred shares of Skyline immediately following the separation. The accounting requirements for reporting the separation of Skyline as a discontinued operation were met when the separation was completed. Subsequent to the deconsolidation of Skyline in March 2026, the Company has three operating segments: (i) specialist isotopes and related services, (ii) nuclear fuels, and (iii) helium and LNG.

The specialist isotopes and related services segment is focused on research and development of technologies and methods used to separate high-value, low-volume isotopes (such as C-14, Molybdenum-100 (“Mo-100"), Si-28 and Yb-176) for highly specialized target end markets other than advanced nuclear fuels, including pharmaceuticals and agrochemicals, nuclear medical imaging and semiconductors, as well as services related to these isotopes, and this segment includes operations of PET Labs, Numed and ECNP.

The nuclear fuels segment is focused on research and development of technologies and methods used to produce high-assay low-enriched uranium (HALEU) and Lithium-6 for the advanced nuclear fuels target end market, and this segment includes operations of QLE.

The Helium and LNG segment is currently focused on the exploration, production and sale of helium and LNG in South Africa, and this segment includes operations of Renergen.

The Company’s chief operating decision maker (“CODM”) is its chief executive officer. The CODM regularly reviews segment operating income (loss) as the primary segment profit measure to evaluate segment performance, identify trends affecting operating results, and assess the effectiveness of the Company's operating strategies. The CODM uses this measure when evaluating resource allocation decisions, including capital investments, personnel decisions, operating expenditures, and acquisition opportunities.

In addition, the CODM reviews segment revenue and segment gross profit (loss) to evaluate pricing, customer mix, and direct cost performance within each segment. The CODM also reviews net income (loss) before income taxes to assess the overall financial performance of each segment and to facilitate comparisons among segments. The CODM regularly reviews any asset information by operating segment as well and, accordingly, asset information is reported on a segment basis.

The following table shows total assets by segment and a reconciliation to the condensed consolidated financial statements as of September 30, 2026 and December 31, 2025 (in thousands):

 

 

 

September 30,
2026

 

 

December 31,
2025

 

Segment assets:

 

 

 

 

 

 

Specialist isotopes and related services

 

$

210,920

 

 

$

321,190

 

Nuclear fuels

 

 

96,707

 

 

 

94,252

 

Helium and LNG

 

 

230,502

 

 

 

—

 

Discontinued operations

 

 

—

 

 

 

82,578

 

Total assets

 

$

538,129

 

 

$

498,020

 

 

Select information from the condensed consolidated statements of operations and comprehensive loss as of the three months ended September 30, 2026 and 2025 is as follows (in thousands):

 

 

Revenues

 

 

Segment Operating Loss

 

 

 

Three Months Ended September 30,

 

 

Three Months Ended September 30,

 

Segment

 

2026

 

 

2025

 

 

2026

 

 

2025

 

Specialist isotopes and related services

 

$

4,257

 

 

$

1,271

 

 

$

(18,630

)

 

$

(11,763

)

Nuclear fuels

 

 

—

 

 

 

—

 

 

 

(11,466

)

 

 

(3,224

)

Helium and LNG

 

 

867

 

 

 

—

 

 

 

(10,419

)

 

 

—

 

 

$

5,124

 

 

$

1,271

 

 

$

(40,515

)

 

$

(14,987

)

 

18


 

Select information from the condensed consolidated statements of operations and comprehensive loss as of the nine months ended September 30, 2026 and 2025 is as follows (in thousands):

 

 

Revenues

 

 

Segment Operating Loss

 

 

 

Nine Months Ended September 30,

 

 

Nine Months Ended September 30,

 

Segment

 

2026

 

 

2025

 

 

2026

 

 

2025

 

Specialist isotopes and related services

 

$

11,512

 

 

$

3,571

 

 

$

(50,094

)

 

$

(27,218

)

Nuclear fuels

 

 

800

 

 

 

—

 

 

 

(29,288

)

 

 

(7,690

)

Helium and LNG

 

 

2,115

 

 

 

—

 

 

 

(20,216

)

 

 

—

 

 

$

14,427

 

 

$

3,571

 

 

$

(99,598

)

 

$

(34,908

)

A reconciliation of total segment revenue to total consolidated revenue and of total segment gross profit and segment operating income to total consolidated income before income taxes, for the three months ended September 30, 2026 and 2025, is as follows (in thousands):

 

 

 

Three Months Ended September 30, 2026

 

 

 

Specialist isotopes and related services

 

 

Nuclear fuels

 

 

Helium and LNG

 

 

Total

 

Product revenue

 

$

4,257

 

 

$

—

 

 

$

867

 

 

$

5,124

 

Less: cost of sales

 

 

(2,631

)

 

 

—

 

 

 

(1,700

)

 

 

(4,331

)

Segment gross profit (loss)

 

 

1,626

 

 

 

—

 

 

 

(833

)

 

 

793

 

Personnel expenses

 

 

9,700

 

 

 

5,098

 

 

 

4,300

 

 

 

19,098

 

Professional fees

 

 

4,167

 

 

 

5,229

 

 

 

1,419

 

 

 

10,815

 

Other segment expenses

 

 

6,389

 

 

 

1,139

 

 

 

3,867

 

 

 

11,395

 

Segment operating loss

 

 

(18,630

)

 

 

(11,466

)

 

 

(10,419

)

 

 

(40,515

)

Foreign exchange transaction loss

 

 

192

 

 

 

(97

)

 

 

(606

)

 

 

(511

)

Change in fair value of investments

 

 

862

 

 

 

(1,850

)

 

 

—

 

 

 

(988

)

Change in fair value of convertible notes payable

 

 

(284

)

 

 

448

 

 

 

—

 

 

 

164

 

Gain on extinguishment of convertible notes

 

 

11,250

 

 

 

—

 

 

 

—

 

 

 

11,250

 

Interest income (expense), net

 

 

5,687

 

 

 

677

 

 

 

(5,512

)

 

 

852

 

Loss before income tax expense

 

$

(923

)

 

$

(12,288

)

 

$

(16,537

)

 

$

(29,748

)

 

 

 

Three Months Ended September 30, 2025

 

 

 

Specialist isotopes and related services

 

 

Nuclear fuels

 

 

Total

 

Product revenue

 

$

1,271

 

 

$

—

 

 

$

1,271

 

Less: cost of sales

 

 

(1,029

)

 

 

—

 

 

 

(1,029

)

Segment gross profit

 

 

242

 

 

 

—

 

 

 

242

 

Personnel expenses

 

 

5,454

 

 

 

2,512

 

 

 

7,966

 

Professional fees

 

 

2,426

 

 

 

410

 

 

 

2,836

 

Other segment expenses

 

 

4,125

 

 

 

302

 

 

 

4,427

 

Segment operating loss

 

 

(11,763

)

 

 

(3,224

)

 

 

(14,987

)

Foreign exchange transaction loss

 

 

(15

)

 

 

—

 

 

 

(15

)

Change in fair value of share liability

 

 

(71

)

 

 

—

 

 

 

(71

)

Change in fair value of convertible notes payable

 

 

—

 

 

 

173

 

 

 

173

 

Interest income, net

 

 

1,568

 

 

 

200

 

 

 

1,768

 

Loss before income tax expense

 

$

(10,281

)

 

$

(2,851

)

 

$

(13,132

)

 

A reconciliation of total segment revenue to total consolidated revenue and of total segment gross profit and segment operating income to total consolidated income before income taxes, for the nine months ended September 30, 2026 and 2025, is as follows (in thousands):

 

 

 

Nine Months Ended September 30, 2026

 

 

 

Specialist isotopes and related services

 

 

Nuclear fuels

 

 

Helium and LNG

 

 

Total

 

Product revenue

 

$

11,512

 

 

$

—

 

 

$

2,115

 

 

$

13,627

 

Collaboration revenue

 

 

—

 

 

 

800

 

 

 

—

 

 

 

800

 

Less: cost of sales

 

 

(6,473

)

 

 

—

 

 

 

(4,014

)

 

 

(10,487

)

Segment gross profit (loss)

 

 

5,039

 

 

 

800

 

 

 

(1,899

)

 

 

3,940

 

Personnel expenses

 

 

26,195

 

 

 

12,838

 

 

 

6,516

 

 

 

45,549

 

Professional fees

 

 

11,252

 

 

 

14,059

 

 

 

2,642

 

 

 

27,953

 

Other segment expenses

 

 

17,686

 

 

 

3,191

 

 

 

9,159

 

 

 

30,036

 

Segment operating loss

 

 

(50,094

)

 

 

(29,288

)

 

 

(20,216

)

 

 

(99,598

)

Foreign exchange transaction loss

 

 

218

 

 

 

(158

)

 

 

(1,670

)

 

 

(1,610

)

Change in fair value of investments

 

 

862

 

 

 

(724

)

 

 

—

 

 

 

138

 

Change in fair value of convertible notes payable

 

 

353

 

 

 

(4,216

)

 

 

—

 

 

 

(3,863

)

Gain on extinguishment of convertible notes

 

 

11,250

 

 

 

—

 

 

 

—

 

 

 

11,250

 

Interest income (expense), net

 

 

9,507

 

 

 

2,137

 

 

 

(8,537

)

 

 

3,107

 

Loss before income tax expense

 

$

(27,904

)

 

$

(32,249

)

 

$

(30,423

)

 

$

(90,576

)

 

19


 

 

 

Nine Months Ended September 30, 2025

 

 

 

Specialist isotopes and related services

 

 

Nuclear fuels

 

 

Total

 

Product revenue

 

$

3,571

 

 

$

—

 

 

$

3,571

 

Less: cost of sales

 

 

(2,430

)

 

 

—

 

 

 

(2,430

)

Segment gross profit

 

 

1,141

 

 

 

—

 

 

 

1,141

 

Personnel expenses

 

 

13,368

 

 

 

5,557

 

 

 

18,925

 

Professional fees

 

 

6,657

 

 

 

1,063

 

 

 

7,720

 

Other segment expenses

 

 

8,334

 

 

 

1,070

 

 

 

9,404

 

Segment operating loss

 

 

(27,218

)

 

 

(7,690

)

 

 

(34,908

)

Foreign exchange transaction loss

 

 

(113

)

 

 

—

 

 

 

(113

)

Change in fair value of share liability

 

 

(200

)

 

 

—

 

 

 

(200

)

Change in fair value of convertible notes payable

 

 

—

 

 

 

(64,542

)

 

 

(64,542

)

Interest income, net

 

 

2,461

 

 

 

577

 

 

 

3,038

 

Loss before income tax expense

 

$

(25,070

)

 

$

(71,655

)

 

$

(96,725

)

 

Other segment expenses primarily consist of selling and marketing expenses, professional fees, occupancy costs, information technology expenses, insurance, depreciation and amortization, and other general and administrative expenses that are regularly provided to the CODM and included in the measure used to determine segment operating loss.

 

6. Property and Equipment

Property and equipment as of September 30, 2026 and December 31, 2025 consisted of the following (in thousands):

 

 

Useful Lives
(Years)

 

September 30,
2026

 

 

December 31,
2025

 

Construction in progress

 

—

 

$

3,768

 

 

$

4,950

 

Plant and office buildings

 

10

 

 

30,786

 

 

 

21,291

 

Land

 

—

 

 

213

 

 

 

—

 

Tools, machinery and equipment

 

3 - 10

 

 

10,060

 

 

 

7,869

 

Computer equipment

 

3

 

 

874

 

 

 

332

 

Vehicles

 

5

 

 

1,436

 

 

 

828

 

Software

 

3-5

 

 

782

 

 

 

613

 

Office furniture

 

5 - 10

 

 

527

 

 

 

248

 

Leasehold improvements

 

Lesser of estimated useful life or the remaining lease term

 

 

700

 

 

 

114

 

Property and equipment, at cost

 

 

 

 

49,146

 

 

 

36,245

 

Less accumulated depreciation

 

 

 

 

(7,420

)

 

 

(2,954

)

Property and equipment, net

 

 

 

$

41,726

 

 

$

33,291

 

The Company has three isotope enrichment plants in Pretoria, South Africa: a C-14 plant, a multi-isotope plant and a laser isotope separation plant using QE technology. As of September 30, 2026 costs incurred for the expansion of PET Labs South Africa were considered construction in progress because the work was not complete. As of December 31, 2025, costs incurred for the expansion of PET Labs South Africa and the improvements to the laser isotope separation plant were considered construction in progress because the work was not complete.

Depreciation expense was $1.6 million and $0.6 million for the three months ended September 30, 2026 and 2025, respectively. Depreciation expense was $4.4 million and $0.9 million for the nine months ended September 30, 2026 and 2025, respectively. Depreciation expense included as part of inventory costs was $0 and $44,000 for the three and nine months ended September 30, 2026, respectively.

Natural gas properties at cost as of September 30, 2026 and December 31, 2025 consisted of the following (in thousands):

 

 

September 30,
2026

 

 

December 31,
2025

 

Proved reserves

 

$

35,518

 

 

$

—

 

Unproved reserves

 

 

72,368

 

 

 

—

 

Wells in process

 

 

5,982

 

 

 

—

 

Developed Assets

 

 

24,005

 

 

 

—

 

Gas processing and liquefaction equipment (Virginia Gas Project)

 

 

19,417

 

 

 

—

 

Construction in progress

 

 

36,847

 

 

 

—

 

Rehabilitation Asset

 

 

3,602

 

 

 

—

 

Natural gas properties, at cost

 

 

197,739

 

 

 

—

 

Less accumulated depreciation, depletion and amortization

 

 

(1,613

)

 

 

—

 

Net capitalized costs

 

$

196,126

 

 

$

—

 

 

Natural gas properties are depleted using the unit-of-production method. Acquisition costs (proved reserves) are depleted over total proved reserves; development costs (developed assets) are depleted over proved developed reserves. Gas processing and liquefaction equipment, including the plant, is depreciated using the straight-line method based on a useful life of 20 years. Construction in progress is not depleted or depreciated until the related assets are placed in service. The useful life of the rehabilitation asset is consistent with the units-of-production depletion of the underlying developed assets. Depreciation and depletion expense attributable to natural gas properties was $1.6 million for the period from January 6, 2026 through September 30, 2026 and $0.5 million for the three months ended September 30, 2026 and is included within the cost of revenue line in the condensed consolidated statements of operations and comprehensive loss.

20


 

7. Prepaid Expenses and Other Current Assets

Prepaid expenses and other current assets as of September 30, 2026 and December 31, 2025 consisted of the following (in thousands):

 

 

September 30,
2026

 

 

December 31,
2025

 

Value-added tax refund receivable

 

$

2,060

 

 

$

763

 

Insurance

 

 

2,033

 

 

 

1,982

 

Vendor advances and deposits

 

 

4,330

 

 

 

1,305

 

Lease receivable

 

 

556

 

 

 

—

 

Other

 

 

1,835

 

 

 

899

 

Total prepaid expenses and other current assets

 

$

10,814

 

 

$

4,949

 

 

8. Accrued Expenses

Accrued expenses as of September 30, 2026 and December 31, 2025 consisted of the following (in thousands):

 

 

September 30,
2026

 

 

December 31,
2025

 

Salaries and other employee costs

 

$

5,772

 

 

$

2,965

 

Professional

 

 

2,544

 

 

 

1,262

 

Other

 

 

634

 

 

 

187

 

Total accrued expenses

 

$

8,950

 

 

$

4,414

 

 

9. Debt

Debt consisted of the following as of September 30, 2026 and December 31, 2025 (in thousands):

 

 

September 30,

 

 

December 31,

 

 

2026

 

 

2025

 

Promissory notes

 

$

332

 

 

$

106

 

Motor vehicle and equipment loans

 

 

1,946

 

 

 

1,949

 

Credit facility

 

 

21,736

 

 

 

—

 

Secured term loans

 

 

22,374

 

 

 

—

 

Unsecured term loans

 

 

6,570

 

 

 

—

 

Total debt

 

 

52,958

 

 

 

2,055

 

less current portion of debt

 

 

(47,690

)

 

 

(584

)

Long term portion of debt

 

$

5,268

 

 

$

1,471

 

 

Credit facility and term loans contain a repayment on demand clause. Management believes the carrying values of debt outstanding approximates fair value based on the interest rates and scheduled maturities applicable to the outstanding borrowings.

Promissory Note Payable

In August 2025, the Company executed a promissory note payable with a finance company to fund a general liability insurance policy for $0.2 million. This note bears interest at an annual rate of 10.0% with twelve monthly payments beginning in August 2025. As of September 30, 2026 and December 31, 2025, this promissory note payable balance was $0 and $0.1 million, respectively.

In August 2026, the Company executed a promissory note payable with a finance company to fund a general liability insurance policy for $0.2 million. This note bears interest at an annual rate of 10.9% with twelve monthly payments beginning in August 2026. As of September 30, 2026 this promissory note payable balance was $0.2 million.

The Company assumed a promissory note in connection with the acquisition of Renergen in January 2026 to fund a general liability insurance policy for approximately $1.1 million. This note bears interest at an annual rate of 9.6% with eleven monthly payments beginning in December 2025. As of September 30, 2026, this promissory note payable balance was $0.1 million.

Motor Vehicle and Equipment Loans

Periodically, the Company enters into loans to purchase motor vehicles and certain equipment. For the nine months ended September 30, 2026, the Company entered into new loans totaling $0.1 million. These loans are secured by the underlying assets included in property and equipment. The loans have variable interest rates ranging from 9.25% to 11.25% and mature from September 2028 to February 2031. Minimum monthly payments total $0.1 million. For each of the three months ended September 30, 2026 and 2025, interest expense under the outstanding loans was $0.1 million. For each of the nine months ended September 30, 2026 and 2025, interest expense under the outstanding loans was $0.2 million. As of September 30, 2026 and December 31, 2025, motor vehicle and equipment loans totaled $1.9 million and $1.9 million, respectively.

Credit Facilities

Renergen's subsidiary Tetra4 entered into a $40.0 million finance agreement with the U.S. International Development Finance Corporation ("DFC"), as successor and assignee of the Overseas Private Investment Corporation ("DFC Credit Facility") on August 20, 2019 (as amended, the “Facility Agreement”). Drawdowns occurred between September 2019 and September 2021. Tetra4 is obligated to repay the loan in equal quarterly installments of $1.1 million on each payment date which began on August 2022 and will end on August 15, 2031. The drawdowns bear interest at rates ranging from 1.24% to 2.11% per annum. The DFC Credit Facility is secured by a pledge of Tetra4’s assets, land and the restricted cash accounts disclosed in Note 2. At all times Tetra4 is required to ensure that its debt service reserve account is funded in an amount equal to the aggregate amount of the sum of all payments of principal, interest and fees made or required to be made by Tetra4 in respect of its indebtedness with respect to the DFC Credit Facility Agreement for the immediately succeeding six-month period. As of September 30, 2026, Tetra4 was in default under the DFC Credit Facility as a result of (a) its failure to timely register the Servitude Security and provide DFC with evidence of such registration with the appropriate Deeds

21


 

Office in the Project Country; (b) its failure to timely deliver its audited annual financial statements, the related auditor reports and the Sponsor’s audited annual financial statements to DFC following Tetra4’s transition from IFRS to US GAAP and the extended PCAOB‑compliant audit procedures required to align with ASPI’s SEC periodic reporting obligations; and (c) cross-default provision of the DFC Credit Facility, which was triggered by Tetra4’s breaches of the IDC Loan Agreement. Tetra4 is actively engaged in discussions with DFC regarding the aforementioned defaults, and, while there can be no assurance that DFC will agree to an amendment or waiver on acceptable terms (or at all), DFC has informally indicated its willingness (i) to extend the deadline for the registration of the Servitude Security to a date falling six months after the anticipated completion date for Phase 1 of the Virginia Gas Project and (ii) to consider extending such audited annual financial statements delivery deadline to no later than the fourth quarter 2026. Failure to obtain such amendments or waivers from DFC could result in DFC exercising remedies available to it under the DFC Credit Facility, including declaring any portion or all of the outstanding principal amount and accrued interest thereon immediately due and payable. As a result of these defaults, DFC may be entitled to accelerate the DFC Credit Facility, which in turn give rise to an event of default under the cross-default provisions of the SBSA Loan. For the period January 6, 2026 through September 30, 2026, interest expense under the DFC Credit Facility was $1.0 million. For the three months ended September 30, 2026, interest expense was $0.3 million. As of September 30, 2026, the outstanding principal amount of the DFC Credit Facility totaled $21.7 million and is classified as current. All capitalized terms used in this paragraph but not defined herein have the meaning ascribed to them in the DFC Credit Facility.

Secured Term Loans

Renergen's subsidiary Tetra4 entered into a ZAR 160.7 million loan agreement (the “IDC Loan Agreement”) with the Industrial Development Corporation of South Africa Limited (“IDC”), as lender, on December 20, 2021 ("IDC Loan"). A drawdown occurred in December 2021 and is repayable in 102 equal monthly payments which commenced in July 2023. The loan terms included a 12-month interest capitalization and an 18-month capital repayment moratorium. The loan accrues interest at the prime lending rate plus 3.5% and is secured by a pledge of Tetra4’s assets, land and the restricted cash disclosed in Note 2. The following financial covenants apply to the IDC Loan: Tetra4 is required to maintain (a) a ratio of all interest bearing Debt to EBITDA of not more than 3.0 to 1; (b) a ratio of Current Assets to Current Liabilities of not less than 1 to 1; (c) a ratio of Cash Flow for the most recently completed four (4) consecutive full fiscal quarters, taken as a single accounting period, to Debt Service for the most recently completed four (4) consecutive full fiscal quarters, taken as a single accounting period, of not less than 1.30 to 1; (d) a ratio of Cash Flow for the most recently completed four (4) fiscal quarters, taken as a single accounting period, to Debt Service for the next succeeding four (4) consecutive full fiscal quarters of not less than 1.3 to 1; and (e) at all times, a Reserve Tail Ratio of not less than 25%. These financial covenants will be measured by Tetra4 on each Calculation Date (defined at the end of each fiscal quarter (including the fourth fiscal quarter) of each financial year, a date falling not less than 45 (forty-five) days thereafter; and at the end of each Fiscal Year, a date falling not less than 90 days thereafter). Additionally, at all times, Tetra4 is required to ensure that the debt service reserve account is funded in an amount equal to, on any given date, a Rand amount equal to the aggregate amount of the sum of all payments of principal, interest and fees made or required to be made by Tetra4 under the IDC Loan Agreement for the immediately succeeding six-month period, to be used as a payment buffer for Tetra4’s repayment obligations under and in terms of the IDC Loan Agreement. The IDC Loan Agreement contains negative covenants, which include that Tetra4 shall not make any shareholder dividend distribution, repay any shareholders’ loans and/or pay any interest on shareholders’ loans or make any payments whatsoever to its shareholders without the IDC’s prior written consent if (i) Tetra4 is in breach of any term of the IDC Loan Agreement; or (ii) the making of such payment would result in a breach of any one or more of the financial ratios described above. As of September 30, 2026, Tetra4 was not in compliance with the financial covenants described in clauses (a)-(d) above, which have been measured with effect from February 15, 2026. Tetra4 was also in breach of its undertakings under the IDC Loan Agreement to (i) register special notarial bonds over assets with an aggregate value of ZAR 150.0 million within one month of commissioning the plant, of which special notarial bonds over assets with an aggregate value of ZAR 72.7 million have been registered and a further special notarial bond over assets with a value of ZAR 13.7 million is in the process of being registered, and (ii) deliver its audited annual financial statements for the fiscal year ended February 28, 2026 within 120 days after the fiscal year end. Tetra4 is actively engaged in discussions with IDC regarding a waiver of these breaches and to amend the IDC Loan Agreement to align the Calculation Date with the completion of Phase 1 of the Virginia Gas Project. Although no assurance can be provided that a waiver will be received (if at all), the Company expects to receive a waiver from IDC in connection with the renegotiation of the applicable Calculation Date. The IDC Loan outstanding on September 30, 2026 amounted to ZAR 135.5 million ($8.3 million) and interest expense for the period January 6, 2026 through September 30, 2026 amounted to ZAR 12.7 million ($0.8 million). Since Tetra4 was in default under the IDC Loan Agreement, the loan balance was classified as current as of September 30, 2026. Interest expense for the three months ended September 30, 2026 amounted to ZAR 5.0 million ($0.3 million). Qualifying interest attributable to assets under construction is capitalized. All capitalized terms used in this paragraph but not defined herein have the meaning ascribed to them in the IDC Loan Agreement.

Pursuant to a Secured Term Loan Facility Agreement, Renergen obtained a ZAR 155.0 million secured loan from Standard Bank of South Africa Limited ("SBSA") on August 30, 2024. Such Secured Term Loan Facility Agreement was subsequently amended and restated on December 12, 2025 ("First Amendment") and August 14, 2026 ("Second Amendment"). The Second Amendment amended and replaced the First Amendment (as amended, the “SBSA Loan”). The drawdowns occurred between August 2024 and October 2024. Under the First Amendment, the SBSA Loan was scheduled to mature on the repayment date of March 31, 2026. Drawdowns under the SBSA Loan prior to the Second Amendment accrued compounded interest at a rate linked to the three-month Johannesburg Interbank Average Rate plus a variable margin (21.725% as of August 13, 2026). Pursuant to the Second Amendment all accrued but unpaid interest up to (but excluding) August 14, 2026 was capitalized, increasing the principal amount of the SBSA Loan to ZAR 230.5 million ($14.2 million), and the maturity date was extended to August 14, 2027. From August 14, 2026, interest on the SBSA Loan accrues at a per annum rate equal to the Compounded Reference Rate (based on the South African Rand Overnight Index Average (ZARONIA)) plus a margin of 1.46% (resulting in an initial effective rate of 8.31%). Upon the occurrence and during the continuance of a default, interest on overdue amounts accrues at an additional 2% per annum above the otherwise applicable rate. The SBSA Loan is a first-ranking cession in security by Renergen of its collateral account held with SBSA and all amounts standing to its credit. In addition, NTIGT Investment Proprietary Limited (“NTIGT”), an affiliate of Mr. Nicholas Mitchell and Mr. Stefano Marani, entered into a limited guarantee, cession and pledge agreement with SBSA, pursuant to which NTIGT guaranteed Renergen’s obligations under the SBSA Loan on a limited basis and had pledged and ceded in security its shares in, and claims against, Renergen and ASP Isotopes, including 1,546,268 shares of ASP Isotopes common stock issued to NTIGT in exchange for shares of Renergen prior to the acquisition by ASP Isotopes. In connection with the Second Amendment, on August 14, 2026, the Company, SBSA, and Renergen, as confirming party, entered into a Put Option Agreement (the “Put Option Agreement”) with respect to the shares pledged by NTIGT under which, in the event of a default, SBSA may put the pledged shares to the Company at a price equal to the volume weighted average price per share of the Company’s common stock traded on the JSE during the five preceding trading days. Additionally, the Company has a current restricted cash account of $14.0 million with SBSA reserving all payments to fulfill obligations under the SBSA Loan. The Molopo litigation discussed below and the need to procure the requisite equity injection by January 24, 2025 previously resulted in events of default with respect to the SBSA Loan. SBSA provided a waiver for both default events. As of September 30, 2026, Renergen was in breach of its obligations under the SBSA Loan to deliver the audited annual financial statements of Tetra4 and its audited consolidated

22


 

financial statements for the fiscal year ended February 28, 2026 within the required periods, and the breaches by Tetra4 under the IDC Loan Agreement and the DFC facility, which entitle those lenders to accelerate the relevant loans, constituted an event of default under the cross-default provisions of the SBSA Loan. As at the date of this report, SBSA has not exercised any remedies in respect of these events of default; however, there can be no assurance that it will not do so. The SBSA Loan outstanding on September 30, 2026 amounted to ZAR 231.4 million ($14.1 million), which is classified as current, and interest expense for the period January 6, 2026 through September 30, 2026 amounted to ZAR 29.3 million ($1.8 million). Interest expense for the three months ended September 30, 2026 amounted to ZAR 7.7 million ($0.5 million).

Unsecured Term Loans

Renergen entered into a $7.0 million unsecured convertible debenture subscription agreement ("Subscription Agreement") with AIRSOL, an Italian wholly-owned subsidiary of SOL S.p.A., on August 30, 2023. The Subscription Agreement provided for two tranches of funding: $3.0 million (“Tranche 1”), received on August 30, 2023, and $4.0 million (“Tranche 2”), received on March 18, 2024. The debentures include a contractual maturity date, initially set at February 28, 2025 and amended by agreement to August 31, 2025, subject to the terms of the Subscription Agreement (as amended) and the related Helium Sale and Purchase Agreement. The debentures accrue interest at 13% per annum, calculated and compounded semi-annually, with interest payable on February 28 and August 31 each year. On August 4, 2026, the legal dispute regarding the payment terms with AIRSOL was resolved and Renergen has agreed to pay the sum of the principal, accrued interest and certain fees for a total of $8.5 million in three equal installments ending in November 2026. As of September 30, 2026, Renergen made two installment payments totaling $5.5 million. The carrying amount of the debentures outstanding as of September 30, 2026 was $2.7 million and is classified as current and due to be paid on November 30, 2026.

Renergen's subsidiary Tetra4 entered into a ZAR 50.0 million loan agreement with Molopo on April 11, 2014. The loan term was for a period of 10 years and six months commencing on July 1, 2014 (repayable on August 31, 2024). During this period the loan was unsecured and is interest free. The loan was discounted on initial recognition and the amortization of the discount applied on initial recognition was recognized in borrowing costs as imputed interest.

As the loan was not repaid on August 31, 2024 it now accrues interest at the prime lending rate plus 2% (12.75% on September 30, 2026). The loan can only be repaid when Tetra4 declares a dividend and utilizes a maximum of 36% of the distributable profits in order to pay the dividend. It is not expected that the loan or interest will be repaid in the next 12 months given the unavailability of distributable profits based on Tetra4’s most recent forecasts. As such, the loan is classified as noncurrent. Interest expense was ZAR 1.9 million ($0.1 million) for the three months ended September 30, 2026 and ZAR 5.3 million ($0.3 million) for the nine months ended September 30, 2026. The Molopo loan outstanding on September 30, 2026 amounted to ZAR 64.2 million ($3.9 million).

In November 2024, Molopo initiated legal proceedings against Tetra4 in the High Court of South Africa, Gauteng Local Division, Johannesburg, by issuing a summons alleging a breach of contract when Renergen sold the 5.5% stake in Tetra4 to Mahlako Gas Energy Proprietary Limited ("MGE"). The claim pertains to a written loan agreement entered into between Molopo, as the lender, and Tetra4, as the borrower, in April 2014 (as described above). As a consequence, Molopo has purported to cancel the loan agreement, which cancellation is disputed by Tetra4 on the basis that the investment by MGE did not constitute a payment by Tetra4 to its parent in the sale. Based on current court timelines (including information published in the Lead Times Bulletin for the High Court in Gauteng), we do not expect the matter to proceed to a hearing within the next two to three years, hence the loan continues to be classified as noncurrent.

Scheduled maturities of the Company’s debt as of September 30, 2026 are as follows (in thousands):

 

2026 (remaining three months)

 

$

47,202

 

2027

 

 

630

 

2028

 

 

649

 

2029

 

 

467

 

2030

 

 

59

 

Thereafter

 

 

3,951

 

Total notes payable

 

$

52,958

 

Less debt - current

 

 

(47,690

)

Debt -noncurrent

 

$

5,268

 

 

Convertible Notes Payable

In March 2024, QLE issued convertible notes payable (“March 2024 Convertible Notes”) totaling $21.1 million and received aggregate cash of $20.6 million. One of the notes totaling $0.5 million was issued to the placement agent in lieu of cash issuance costs.

In June 2024, QLE issued additional convertible notes payable (“June 2024 Convertible Notes”) totaling $5.5 million and received aggregate cash of $5.4 million. One of the notes totaling $0.1 million was issued to the placement agent in lieu of cash issuance costs Issuance costs paid in cash were negligible. The March 2024 Convertible Notes and the June 2024 Convertible Notes are collectively the “2024 Convertible Notes”.

The 2024 Convertible Notes were payable on demand in March 2029 and bear interest at an annual rate of 6% through March 7, 2025 and 8% thereafter. Upon a qualified financing event, the 2024 Convertible Notes convert into the shares issued in that qualified financing event at a price per share equal to 80% of the share price issued subject to a valuation cap. Upon a qualified transaction, the noteholders may elect to receive either 1.5x the principal and accrued interest balance in cash or convert into common shares.

The 2024 Convertible Notes were recorded on the condensed consolidated balance sheet at their fair values. The fair value of the March 2024 Convertible Notes on the date of issuance was $21.1 million. The fair value of the June 2024 Convertible Notes on the date of issuance was $5.5 million. The fair value of the 2024 Convertible Notes as of September 30, 2025 was determined to be $98.1 million and the resultant change in fair value of $0.2 million and $64.5 million was recorded in other income and expense in the condensed consolidated statement of operations and comprehensive loss for the three and nine months ended September 30, 2025, respectively. In connection with the issuance of the 2025 Convertible Notes (as described below), QLE’s outstanding 2024 Convertible Notes originally issued in March 2024 and June 2024 automatically converted into 2025 Convertible Notes with a new principal amount of $147.7 million which is equal to its fair value on the date of conversion.

In November 2025, QLE issued convertible notes payable (“2025 Convertible Notes”) totaling $72.2 million and received aggregate cash of $69.6 million, including $30.0 million in gross proceeds from ASP Isotopes, its parent. Together with the conversion of the 2024 Convertible Notes, the Company issued 2025 Convertible Notes totaling $189.9 million. The maturity date of the 2025 Convertible Notes is November 19, 2030. The 2025 Convertible Notes automatically convert into common shares upon QLE’s closing

23


 

of an IPO or other qualifying public transaction at 80% of the share price, taking into consideration a valuation cap. Issuance costs paid in cash totaling $2.6 million were expensed in selling, general and administrative costs in the condensed consolidated statement of operations and comprehensive loss for the year ended December 31, 2025.

On July 15, 2026, QLE and ASP entered into separate, individually negotiated private securities exchange agreements with certain holders of the 2025 Convertible Notes, pursuant to which such noteholders exchanged approximately $109.2 million in aggregate principal amount of the outstanding 2025 Convertible Notes, plus accrued and unpaid interest thereon, for an aggregate of approximately 23.2 million shares of ASP's common stock (the “Exchange Transactions”). The Exchange Transactions closed on July 16, 2026. Upon the closing of the Exchange Transactions, the outstanding principal amount of 2025 Convertible Notes held by third party investors was reduced to approximately $80.6 million, and ASP holds approximately $139.2 million aggregate principal amount of 2025 Convertible Notes.

The 2025 Convertible Notes are recorded on the condensed consolidated balance sheet at their fair values. The fair value of the 2025 Convertible Notes as of September 30, 2026 and December 31, 2025 has been determined to be $85.9 million and $199.3 million, respectively. The Company recorded a gain on extinguishment of convertible notes of $11.3 million as a result of entering into the Exchange Transactions for the three and nine months ended September 30, 2026. The resultant change in fair value of the 2025 Convertible Notes for the three and nine months ended September 30, 2026 was $0.2 million and $3.9 million, respectively. Both the gain on extinguishment of convertible notes and change in fair value of convertible notes has been recorded in other income and expense in the condensed consolidated statement of operations and comprehensive loss. As of September 30, 2026, the total principal and accrued interest of the 2025 Convertible Notes was $80.6 million and $5.6 million, respectively, on the Company’s condensed consolidated balance sheet.

TerraPower Loan Agreement

The Company announced QLE and certain of its subsidiaries have entered into a loan agreement with TerraPower (the “TerraPower Loan Agreement”), a US nuclear innovation company, for a multiple advance term loan of up to $22.0 million related to financing support for the construction of a new uranium enrichment facility capable of producing HALEU in South Africa. Per the terms of the TerraPower Loan Agreement and subject to the satisfaction of various conditions precedent to each disbursement (including receiving all required licenses and permits to perform uranium enrichment in South Africa), the borrower could receive aggregate loan disbursements of $20.0 million.

10. Deferred Revenues

In June 2023, the Company entered into a Supply Agreement with a customer for the delivery of Mo-100 and molybdenum-98 beginning in 2024. In conjunction with the Supply Agreement, the Company received $0.9 million in September 2023, as an advance towards future revenue. The Company has recorded $0.9 million as deferred revenue on the balance sheet as of September 30, 2026 and December 31, 2025.

The Company assumed a token liability in connection with the acquisition of Renergen in January 2026. Tokens to acquire helium at a fixed price with a value of $0.8 million were issued during 2023 and have no expiration date. When a token is redeemed, revenue relating to the transaction will be recognized at the original value at which the token was issued. The Company has recorded $0.8 million as deferred revenue - noncurrent on the balance sheet as of September 30, 2026.

11. Commitments and Contingencies

Commitments

Share Purchase Agreement relating to PET Labs

On October 31, 2023, the Company entered into a Share Purchase Agreement with Nucleonics Imaging Proprietary Limited, a company incorporated in the Republic of South Africa (the “Seller”), relating to the purchase and sale of ordinary shares in the issued share capital of PET Labs. PET Labs is a South African radiopharmaceutical operations company, dedicated to nuclear medicine and the science of radiopharmaceutical production.

Under the Purchase Agreement, the Company agreed to purchase from the Seller 51 ordinary shares in the issued share capital of PET Labs (the “Initial Sale Shares”) (representing 51% of the issued share capital of PET Labs). In addition to the purchase consideration, the Company has an option to purchase from the Seller the remaining 49 ordinary shares in the issued share capital of PET Labs (the “Option Shares”) (representing the remaining 49% of the issued share capital of PET Labs) for an agreed consideration totaling $2.2 million. The Company agreed to pay to the Seller an aggregate of $2.0 million for the Initial Sale Shares, of which aggregate amount of $0.5 million was payable on the completion of the sale of the Initial Sale Shares and $1.5 million was payable on demand after one calendar year from the agreement date. In January 2024, the Company agreed to pay $0.3 million to the Seller. The Company paid an additional $0.7 million and $0.5 million in January 2025 and December 2025, respectively, resulting in the Initial Sale Shares being paid in full as of December 31, 2025. The option is exercisable from the agreement date until January 31, 2027. The option has not been exercised as of September 30, 2026 and no amount relating to the option has been recognized.

PET Labs Global

In August 2024, PET Labs Global entered into a three-year service agreement with Cayman Enterprise City and is licensed to operate from within the Cayman Islands’ Special Economic Zone (“SEZ”). The service fee includes among other things the right to use certain office space and associated facilities within the SEZ. The Company has applied the guidance in ASC 842 and determined that this agreement is not a leasing arrangement. Management has determined that based on the nature of the combined services the expense should be recognized as incurred.

Renergen Firm Intention Letter and Loan Agreement

On March 31, 2025, the Company entered into an Exclusivity Agreement with Renergen, an entity in South Africa listed on the Johannesburg Stock Exchange (“JSE”), the Australian Stock Exchange and the A2X. On May 18, 2025, the Exclusivity Agreement was amended. Per the terms of the amended Exclusivity Agreement, the Company received the rights to negotiate the terms of the acquisition of Renergen during an exclusive negotiation period that ended on May 31, 2025. In April 2025, the Company paid an exclusivity fee of $10.0 million to Renergen.

As contemplated in the Exclusivity Agreement signed on March 31, 2025 and amended on May 18, 2025, the Company entered into a Firm Intention Letter with Renergen on May 19, 2025. The Firm Intention Letter sets the acquisition terms for the Company to purchase 100% of the outstanding shares of Renergen in exchange for shares of the Company. The completion of the acquisition was subject to several closing conditions including Renergen shareholder approval, which was obtained on July 10, 2025. The acquisition

24


 

was consummated on January 6, 2026, and as a result, Renergen became a direct, wholly owned subsidiary of the Company, and the Renergen Ordinary Shares were delisted from the JSE, the Australian Securities Exchange and the A2X (Note 14).

In addition, the Company entered into a loan agreement with Renergen ("Renergen Loan") in which a total of $30.0 million was provided by the Company for the purpose of funding Renergen’s operations. In conjunction with the Renergen Loan, the full amount of the previously paid exclusivity fee of $10.0 million was applied to the Renergen Loan. The remaining $20.0 million available under the Renergen Loan was paid by the Company to Renergen in June 2025. The Renergen Loan matured and repayment was due on September 30, 2025. The Renergen Loan bears interest at the South African Prime Rate, which was approximately 10.75% as of September 30, 2026. The Renergen Loan was amended to extend the repayment date to January 20, 2026 and amended again to establish the repayment date as sixty days after written demand by the Company. Pursuant to additional amendments, the aggregate principal amount available under the Renergen Loan was increased to $120 million. The Renergen Loan, including all interest accrued, is eliminated in consolidation.

Certain Commitments to the South Africa Competition Commission

In connection with the Company's acquisition of Renergen, the Company made certain commitments to the South Africa Competition Commission designed to address public interest concerns and promote historically disadvantaged persons (“HDP”) and worker ownership. These commitments to the South Africa Competition Commission include: (1) a moratorium on retrenchments of workers at Renergen’s operations for a period of two years from the merger closing date; and (2) a commitment to implement, within 12 months of the merger closing date, a trust for the benefit of qualifying workers employed by Renergen and certain HDP communities and people located within the production rights area of the Virginia Gas Project (the “HDP and Worker Trust”). Upon the effective implementation date of the HDP and Worker Trust, the HDP and Worker Trust are expected to hold an aggregate 5% of the issued shares in Tetra4 and Renergen is expected to hold 89.5% of the issued shares in Tetra4, subject to change in accordance with any capital raising activities of the Company, Renergen and/or Tetra4 following the merger closing date. In conjunction with the establishment of the HDP and Workers Trust, Tetra4 will issue an offsetting vendor financed loan to the HDP and Worker Trust. The HDP and Worker Trust will continue for the duration of the Production Right held by Tetra4, which will expire during 2042, unless extended.

Contingencies

From time to time, the Company may have certain contingent liabilities that arise in the ordinary course of its business activities. The Company accrues liabilities for such matters when future expenditures are probable and such expenditures can be reasonably estimated.

On December 4, 2024, a purported stockholder of the Company filed a putative securities class action on behalf of purchasers of the Company’s securities between October 30, 2024 through November 26, 2024 against ASP Isotopes Inc. and certain of its executive officers in the United States District Court for the Southern District of New York (Corredor v. ASP Isotopes Inc., et al., Case No. 1:24-cv-09253 (S.D.N.Y.)) (the “Securities Class Action”). The Securities Class Action alleges that the Company, its chief executive officer and chief financial officer (“Defendants”) made materially misleading or false statements or omissions regarding the Company’s business and asserts purported claims under §§ 10(b) and 20(a) of the Securities Exchange Act of 1934, as amended (the "Exchange Act") and SEC Rule 10b-5 promulgated thereunder. The complaint seeks unspecified compensatory damages, attorney’s fees and costs. On May 2, 2025, the Court appointed Mark Leone (“Leone”) as lead plaintiff and directed the Clerk of court to amend the caption to substitute Leone for Alexander Corredor as plaintiff. On May 2, 2025, the Court also appointed lead counsel and set deadlines for filing an amended consolidated class action complaint and briefing schedules for a motion to dismiss, if any, and class certification. On May 27, 2025, Leone and two additional named plaintiffs (“Plaintiffs”) filed the amended class action complaint (“Amended Complaint”), that asserts the same causes of action and seeks the same relief as the initial complaint and is based upon substantially similar factual allegations as the initial complaint. On June 27, 2025, Defendants filed a motion to dismiss the Amended Complaint. Also on June 27, 2025, Plaintiffs filed a motion for class certification. On December 4, 2025, the Court denied in part Defendants’ motion to dismiss and granted Plaintiffs’ motion for class certification. On April 3, 2026, following a mediation in which the parties reached an agreement-in-principle to resolve all claims in the Securities Class Action, subject to the Court’s approval, the parties filed a Joint Stipulation agreeing to stay the Securities Class Action (the “Stipulation”). On April 6, 2026, the Court approved the Stipulation. On July 7, 2026, Plaintiffs filed a motion for preliminary approval of the settlement. The motion for preliminary approval of the settlement also requested that the Court certify the settlement class and approve the proposed notice to stockholders. On July 9, 2026, the Court granted such motion, issued an order preliminarily approving the settlement, and scheduled a settlement hearing for December 15, 2026. Under the proposed settlement, the Plaintiffs are expected to receive $9.35 million, which is expected to be substantially funded by insurance proceeds, and the defendants (including the Company) are expected to receive customary releases. The Company's remaining exposure likely consists primarily of applicable retentions and deductibles, which have been substantially paid or accrued as of September 30, 2026. The Company cannot be certain of the outcome of the Securities Class Action.

On January 30, 2026, a purported stockholder of the Company filed a derivative action against certain members of the Company’s board of directors in the United States District Court for the Northern District of Texas asserting claims for, among others, breach of fiduciary duty, violation of § 14(a) of the Exchange Act and a claim for contribution pursuant to § 21D thereof (Jenis v. Mann, et al., Case No. 3:26-cv-251 (N.D. Tex.)) (the “Jenis Action”). The Company is named as a Nominal Defendant. On March 2, 2026, a different purported stockholder of the Company filed a derivative action against certain members of the Company’s board of directors in the United States District Court for the Southern District of New York asserting claims for, among others, breach of fiduciary duty, violations of §§ 14(a) and 20(a) of the Exchange Act, and a claim for contribution pursuant to § 21D thereof (Stewart v. Mann, et al., Case No. 1:26-cv-1712 (S.D.N.Y.)) (the “Stewart Action”)). The Company is named as a Nominal Defendant. On June 10, 2026, a different purported stockholder of the Company filed a derivative action against certain members of the Company’s board of directors in the United States District Court for the Northern District of Texas asserting claims for, among others, breach of fiduciary duty, violations of §§ 10(b) and 14(a) of the Exchange Act, and a claim for contribution pursuant to § 21D thereof (Albers v. Mann, et al., Case No. 3:26-cv-1923 (N.D. Tex.)) (the “Albers Action”). The Company is named as a Nominal Defendant. On July 1, 2026, a different purported stockholder of the Company filed a derivative action against certain members of the Company’s board of directors in the United States District Court for the Southern District of New York asserting claims for, among others, breach of fiduciary duty and violation of § 14(a) of the Exchange Act (Manrique v. Mann, et al., Case No. 1:26-cv-5580 (S.D.N.Y.)) (the “Manrique Action”) (together with the Jenis Action, the Stewart Action, and the Albers Action, the “Derivative Actions”). The Company is named as a Nominal Defendant. The Derivative Actions arise out of similar allegations as those made in the Securities Class Action. The plaintiffs in the Derivative Actions seek unspecified damages, disgorgement of compensation, corporate governance reforms, fees, interests, and costs. On July 2, 2026 and July 7, 2026, the Courts in the Stewart Action and Jenis Action, respectively, upon joint motions by the parties, issued orders staying the action in light of the parties’ settlement discussions. The Company cannot be certain of the outcome of the Derivative Actions and, if decided adversely to us, our business and financial condition may be adversely affected.

25


 

In November 2024, Molopo Energy Limited ("Molopo") initiated legal proceedings against Tetra4 in the High Court of South Africa, Gauteng Local Division, Johannesburg, by issuing a summons alleging breach of a written loan agreement concluded between Molopo, as lender, and Tetra4, as borrower, in April 2014 (the "Molopo Loan Action"). The Molopo Loan Action alleges that Renergen, Tetra4's parent company, breached a condition of the loan agreement when it sold a 5.5% stake in Tetra4 to Mahlako Gas Energy Proprietary Limited ("MGE"), and that such breach entitled Molopo to cancel the loan agreement. Tetra4 disputes the purported cancellation on the basis that the investment by MGE did not constitute a payment by Tetra4 to its parent within the meaning of the loan agreement and is vigorously defending the Molopo Loan Action. Based on current court timelines (including information published in the Lead Times Bulletin for the High Court in Gauteng), we do not expect the matter to proceed to a hearing within the next two to three years. The Company cannot be certain of the outcome of the Molopo Loan Action and, if decided adversely to us, our business and financial condition may be adversely affected.

In addition to the matters described above, from time to time, the Company may become subject to arbitration, litigation or claims arising in the ordinary course of business. The results of any current or future claims or proceedings cannot be predicted with certainty, and regardless of the outcome, litigation can have an adverse impact on us because of defense and litigation costs, diversion of management resources, reputational harm and other factors.

12. Leases

Operating leases

The Company is party to several facility leases in South Africa and the U.S. for office, manufacturing and laboratory space. Dr. Gerdus Kemp, an officer of PET Labs and an employee of ASP UK, is the sole owner of a leased office and production facility in Pretoria, South Africa. During 2026, the Company has expanded its facility leases in South Africa and entered into a lease for office space in Dallas, Texas, which serves as its corporate headquarters, and Austin, Texas, which serves as QLE's corporate headquarters. In conjunction with the acquisition of Renergen in January 2026, the Company recognized additional operating leases for its office space in South Africa. The Company also leases office and production space in Pretoria, South Africa and Cayman Islands that are accounted for as short-term leases.

Quantitative information regarding the Company’s operating lease liabilities is as follows (in thousands):

 

 

Three Months Ended September 30,

 

 

Nine Months Ended September 30,

 

 

 

2026

 

 

2025

 

 

2026

 

 

2025

 

Operating Lease Cost

 

 

 

 

 

 

 

 

 

 

 

 

Operating lease cost

 

$

393

 

 

$

209

 

 

$

1,052

 

 

$

552

 

Other Information

 

 

 

 

 

 

 

 

 

 

 

 

Operating cash flows paid for amounts included in the
   measurement of lease liabilities

 

$

384

 

 

$

202

 

 

$

1,042

 

 

$

534

 

Operating lease liabilities arising from obtaining right-of-
   use assets

 

$

52

 

 

$

15

 

 

$

4,675

 

 

$

114

 

Weighted average remaining lease term (years)

 

 

17.18

 

 

 

3.45

 

 

 

17.18

 

 

 

3.45

 

Weighted average discount rate

 

 

11.34

%

 

 

8.80

%

 

 

11.34

%

 

 

8.80

%

Future lease payments under noncancelable operating lease liabilities as of September 30, 2026 are as follows (in thousands):

 

 

Operating
Leases

 

Future Lease Payments

 

 

 

2026 (remaining three months)

 

$

385

 

2027

 

 

1,578

 

2028

 

 

1,283

 

2029

 

 

922

 

2030

 

 

806

 

Thereafter

 

 

9,335

 

Total lease payments

 

$

14,309

 

Less: imputed interest

 

 

(8,618

)

Total operating lease liabilities

 

$

5,691

 

Less current portion

 

$

(928

)

Operating lease liability - noncurrent

 

$

4,763

 

The Company records the expense from short-term leases as incurred. Lease expense from short-term leases was $79,000 and $32,000 for the three months ended September 30, 2026 and 2025, respectively. Lease expense from short-term leases was $0.2 million and $96,000 for the nine months ended September 30, 2026 and 2025, respectively.

Financing leases

The Company is party to several ongoing finance leases in South Africa for vehicles and equipment. Some of these finance leases include arrangements with variable interest rates indexed to the prime interest rate in South Africa. There was no variable interest expense for the three months ended September 30, 2026 and 2025. The Company elects to include finance lease right-of-use assets in property and equipment, net.

26


 

Quantitative information regarding the Company’s finance lease liabilities is as follows (in thousands):

 

 

Three Months Ended September 30,

 

 

Nine Months Ended September 30,

 

 

 

2026

 

 

2025

 

 

2026

 

 

2025

 

Finance Lease Cost

 

 

 

 

 

 

 

 

 

 

 

 

Interest on lease liabilities

 

$

18

 

 

$

23

 

 

$

60

 

 

$

45

 

Other Information

 

 

 

 

 

 

 

 

 

 

 

 

Operating cash flows paid for amounts included in the
   measurement of finance lease liabilities

 

$

71

 

 

$

32

 

 

$

177

 

 

$

62

 

Amortization of right-of-use assets

 

$

28

 

 

$

13

 

 

$

86

 

 

$

53

 

Weighted average remaining lease term (years)

 

 

3.1

 

 

 

4.0

 

 

 

3.1

 

 

 

4.0

 

Weighted average discount rate

 

 

13.5

%

 

 

13.1

%

 

 

13.5

%

 

 

13.1

%

Future lease payments under noncancelable finance lease liabilities are as follows as of September 30, 2026 (in thousands):

 

 

Finance
Leases

 

Future Lease Payments

 

 

 

2026 (remaining three months)

 

$

53

 

2027

 

 

217

 

2028

 

 

196

 

2029

 

 

76

 

2030

 

 

75

 

Thereafter

 

 

—

 

Total lease payments

 

$

617

 

Less: imputed interest

 

 

(125

)

Total lease liabilities

 

$

492

 

Less current portion

 

$

(157

)

Finance lease liability - noncurrent

 

$

335

 

Lease receivable

The Company leases certain equipment to customers under sales-type leases and records the leases within lease receivables on the Company’s condensed consolidated balance sheets and records interest income in the Company’s condensed consolidated statements of operations and comprehensive loss. The Company does not have significant variable lease payments or residual value guarantees associated with these leases. Credit risk is monitored regularly, and no allowance for credit losses was recorded as of the reporting date.

The Company’s net investment in sales-type leases were comprised of the following (in thousands):

 

 

 

September 30, 2026

 

Total undiscounted cash flows

 

$

8,876

 

Present value discount

 

 

(4,323

)

Net investment in sales-type leases

 

$

4,553

 

Less current portion

 

$

(556

)

Net investment in sales-type leases - noncurrent

 

$

3,997

 

The current portion of sales-type leases is included in prepaid and other current assets on the balance sheet.

Future minimum lease payments to be collected under sales-type leases, excluding lease payments that are not fixed and determinable, as of September 30, 2026 are as follows (in thousands):

 

 

Sales-type
Leases

 

Future Lease Payments To Be Collected

 

 

 

2026 (remaining three months)

 

$

451

 

2027

 

 

1,275

 

2028

 

 

1,275

 

2029

 

 

1,275

 

2030

 

 

1,167

 

Thereafter

 

 

3,433

 

Total undiscounted cash flows

 

$

8,876

 

Interest income recognized from sales-type leases during the three and nine months ended September 30, 2026 was $0.2 million and $0.5 million respectively. Interest income recognized from sales-type leases during the three and nine months ended September 30, 2025 was $45,000.

13. License and Collaboration Agreements

TerraPower, LLC

TerraPower Agreement

On April 4, 2024, the Company entered into an agreement with TerraPower LLC (“TerraPower”) to develop a conceptual design, refined cost/schedule/financing, risk register, and term sheet for a HALEU facility (the “TerraPower R&D Agreement”). The TerraPower R&D Agreement may be terminated for (a) breach or default, (b) the Company’s convenience or (c) TerraPower’s convenience. TerraPower is obligated to make all payments for tasks completed by the Company per the statement of work in the TerraPower R&D Agreement totaling $2.0 million and these payments are nonrefundable. Neither party has any additional rights or obligations outside what is in the statement of work in the TerraPower R&D Agreement.

27


 

On October 18, 2024, the Company and TerraPower signed a term sheet (the “TerraPower Term Sheet”) that provides for the execution of two definitive agreements: (1) an agreement pursuant to which TerraPower will provide funding for the Company’s construction of a uranium enrichment facility capable of producing HALEU using the Company’s proprietary aerodynamic separation process technology to be located in the Republic of South Africa and (2) an agreement pursuant to which the Company will deliver to TerraPower the full capacity of the enrichment facility.

The Company accounts for the TerraPower R&D Agreement as a collaboration arrangement in accordance with ASC 808. The Company has concluded that other authoritative accounting literature does not apply directly to these payments from TerraPower, either directly or by analogy, including ASC 606 because TerraPower is not a customer. The Company has concluded that TerraPower is not a customer because TerraPower has not contracted with the Company to obtain goods or services that are an output of the Company’s ordinary activities in exchange for consideration. The Company also has concluded that there is no other authoritative accounting literature that is appropriate to apply by analogy, and, accordingly, its accounting policy is to evaluate the income statement classification for presentation of amounts associated with each separate activity. As a result, the Company concludes that all portions of the net receivable from TerraPower are directly related to the conceptual design of the HALEU facility. Furthermore, the Company and TerraPower will jointly develop criteria for optimization of the HALEU facility’s operations. TerraPower shares the risks and rewards of designing the HALEU facility since its successful completion will enable TerraPower to purchase output from the HALEU facility in the future.

For the nine months ended September 30, 2026, $0.8 million of collaboration revenue was recognized in the condensed consolidated statements of operations and comprehensive loss. No collaboration revenue was recognized for the three months ended September 30, 2026.

TerraPower Loan Agreement and HALEU Supply Agreements

In May 2025, the Company entered into the TerraPower Loan Agreement, which provides conditional commitments from TerraPower to the Company through one of its wholly-owned U.S.-based subsidiaries (“Borrower”) for a multiple advance term loan totaling $22.0 million for the purpose of partially funding the construction of a proposed new uranium enrichment facility in South Africa. The total loan amount is inclusive of a 10% original issue discount on each disbursement and carries a fixed interest rate of 10% per annum. Per the terms of the TerraPower Loan Agreement and subject to the satisfaction of various conditions precedent to disbursements (including receiving all required licenses and permits to perform uranium enrichment in South Africa), the Company will receive aggregate loan disbursements of $20.0 million. Such loan matures on May 16, 2032. Interest will begin accruing upon each milestone disbursement received by the Company and will be added to the principal balance until November 2027. Principal and interest payments will be made in equal installments beginning in November 2027. No drawdowns have been requested as of September 30, 2026.

In addition to the Terra Power Loan Agreement, the Company and TerraPower have entered into two supply agreements for the HALEU expected to be produced at the Company’s uranium enrichment facility. The initial core supply agreement is intended to support the supply of the required first fuel cores for the initial loading of TerraPower’s Natrium project in Wyoming. The long-term supply agreement is a 10-year supply agreement of up to a total of 150 metric tons of HALEU, commencing in 2028 through end of 2037.

American Ventures Advisory Agreement

On October 28, 2025, QLE entered into an Advisory Agreement (“Advisory Agreement”) with American Ventures LLC, a Delaware limited liability company (“American Ventures”). Under the Advisory Agreement, American Ventures will provide various services to the Company related to QLE and its present and future subsidiaries’ business and operations.

In October 2025, pursuant to the Advisory Agreement, QLE issued RSUs representing a right to receive a number of units or shares of common equity of QLE equal to 4.0% of the common equity of QLE deemed outstanding as of the date of grant, treating as outstanding only (i) ASP Isotopes’ membership interest in the Company and (ii) the shares or units of common equity issuable upon conversion of the 2024 Convertible Notes (or any securities issued upon conversion or exchange thereof). The total number of such RSUs cannot yet be calculated because the precise number of these units is based on a percentage of common equity deemed outstanding, which is contingent, in part, on the amount of securities issuable upon the conversion of certain of QLE’s 2025 Convertible Notes that were issued upon conversion of certain 2024 Convertible Notes. Such RSUs will vest as follows: (x) 50% upon the completion of the listing event, provided that such listing event occurs within 24 months of October 28, 2025, and (y) 50% on the six-month anniversary of such listing event.

 

14. Acquisitions and Merger Agreement

The Company accounts for business combinations in accordance with Business Combinations (Topic 805), which requires an acquirer to retrospectively adjust provisional amounts recognized in a business combination during the measurement period (which represents a period not to exceed one year from the date of the acquisition), in the reporting period in which the adjustment is determined, as well as present separately on the face of the income statement or as a disclosure in the notes to the condensed consolidated financial statements, the portion of the amount recorded in current period earnings that would have been recorded in previous reporting periods if the adjustment to the provisional amounts had been recognized as of the acquisition date.

 

PET Labs Acquisition

In October 2023, the Company completed the acquisition of PET Labs. The acquisition is intended to accelerate the distribution of the Company’s nuclear medicine pipeline.

Pursuant to the terms of the agreement, the Company acquired 51% of the common shares issued and outstanding for total purchase consideration of $2.0 million in cash of which $0.5 million was paid up front. In December 2025, January 2025 and January 2024, the Company made partial payments of $0.5 million, $0.7 million and $0.3 million, respectively, resulting in no balance remaining as of December 31, 2025.

In addition to the purchase consideration, the Company has an option to purchase the remaining 49% of the issued and outstanding shares for an agreed consideration totaling $2.2 million. No consideration or value relating to this option was recognized as it was not considered probable at the time of acquisition and as of September 30, 2026.

Dr. Gerdus Kemp is an officer of PET Labs and, effective November 1, 2023, an employee of ASP Guernsey. In addition, Dr. Kemp controls the remaining 49% ownership of PET Labs.

28


 

East Coast Nuclear Pharmacy Acquisition

In October 2025, the Company completed the acquisition of ECNP. The acquisition is intended to supplement the distribution of the Company’s nuclear medicine pipeline. The acquisition of ECNP has been accounted for as a business combination in accordance with ASC 805.

Pursuant to the terms of the agreement, the Company acquired 100% of the issued and outstanding membership interests for total purchase consideration of $2.5 million of which $2.0 million was paid up front in cash and the remaining $0.5 million was deferred through the issuance of notes payable that were repaid in June 2026. The balance of the notes payable as of September 30, 2026 and December 31, 2025 was $0 and $0.5 million respectively.

The following table summarizes the allocation of the purchase consideration to the fair value of the assets acquired and liabilities assumed (in thousands):

 

Fair value of business combination

 

 

 

Cash consideration

 

$

2,000

 

Notes payable to Sellers

 

 

500

 

Identifiable assets acquired and liabilities assumed

 

 

 

Cash and cash equivalents

 

 

40

 

Accounts receivable

 

 

550

 

Inventory

 

 

92

 

Prepaid expenses and other current assets

 

 

6

 

Identifiable intangible assets

 

 

430

 

Accounts payable

 

 

(113

)

Other current liabilities

 

 

(79

)

Total identifiable assets acquired and liabilities assumed

 

 

926

 

Goodwill

 

 

1,574

 

Total purchase consideration

 

$

2,500

 

Goodwill arising from the acquisition as of October 1, 2025 of $1.6 million was attributable mainly to buyer specific synergies expected to arise from the acquisition. No goodwill from this acquisition is deductible for income tax purposes. The Company considered the contractual value of accounts receivable to be the same as the fair value and the full amount was collected. The results of ECNP have been included in the condensed consolidated financial statements from the date of the acquisition.

One 30 Seven Inc. ("One 30 Seven") Acquisition

In October 2025, QLE acquired substantially all of the assets, including an international patent application and its related rights, from One 30 Seven, a Canadian company engaged in the business of researching and developing decontamination solutions for nuclear waste, particularly radioactive waste from radioactive materials from nuclear power plants, radiopharmaceuticals, and military sources. QLE made an initial cash payment of $150,000 and issued 266,113 shares of the Company’s common stock and accounted for the transaction as a purchase of assets. The Company may be required to make additional payments, in cash or shares of the Company’s common stock, totaling $17.0 million upon completion of certain milestones. This contingent payment was not considered probable at the acquisition date and September 30, 2026 and therefore no contingent consideration was recorded for the year ended December 31, 2025 or the nine months ended September 30, 2026.

In connection with the acquisition of assets from One 30 Seven, QLE entered into a consulting agreement with B-Con Engineering Inc., led by inventor Brian Creber, to develop and validate the functional operation of a Creber Mini Unit designed to accelerate the beta decay of high-level waste and rapidly convert these long half-life isotopes into stable isotopes at an estimated cost of $4.5 million over 18 months, followed by either a Midi or Maxi Unit at approximately $12.5 million to $13.0 million over another 18 months. QLE has agreed to fund the project through quarterly advances, with acceptance testing and monthly reporting to ensure milestones are met. In addition, QLE entered into a royalty agreement with One 30 Seven pursuant to which QLE agreed to pay a 6.0% royalty on net revenues from product sales or licensing for 15 years per product, starting from the first commercial sale. The royalty agreement will terminate if the commercialization of a Creber Unit is not achieved by the fourth anniversary of closing of the acquisition of assets from One 30 Seven.

The Company determined that the cost to acquire the One 30 Seven assets was $2.7 million, based on the cash paid of $150,000, fair value of the equity consideration issued of $2.6 million and direct costs of the acquisition of $7,000. The One 30 Seven acquisition was accounted for as an asset acquisition as One 30 Seven was not considered to be a business under ASC 805 or SEC Rule 11-01(d) as substantially all of the fair value of the non-monetary assets acquired was concentrated in a single identifiable asset. In the estimation of fair value of the asset purchase consideration, the Company used fair value attributable to the acquired IPR&D. Since One 30 Seven was in the development stage and no commercial production had commenced at the time of the acquisition, the cost attributable to the IPR&D was expensed in the Company’s condensed consolidated statements of operations and comprehensive loss for the year ended December 31, 2025, as the acquired IPR&D had no alternative future use.

Numed Diagnostics, LLC Acquisition

In January 2026, the Company completed the acquisition of Numed Diagnostics, LLC ("Numed"). The acquisition is intended to supplement the distribution of the Company’s pipeline. The acquisition of Numed has been accounted for as a business combination in accordance with ASC 805.

Pursuant to the terms of the agreement, the Company acquired 60% of the issued and outstanding membership interests for total purchase consideration of $0.8 million. In addition to the purchase consideration, the Company is obligated to purchase an additional 36% of Numed's membership interests for $0.5 million within two years and has an option to purchase the remaining 4% of the issued and outstanding membership interests for $50,000. Consideration relating to this obligated purchase of $0.4 million was recognized at acquisition and as of September 30, 2026.

29


 

The following table summarizes the preliminary allocation of the purchase consideration to the fair value of the assets acquired and liabilities assumed (in thousands):

 

Fair value of business combination

 

 

 

Cash consideration

 

$

721

 

Obligated Consideration

 

 

358

 

Identifiable assets acquired and liabilities assumed

 

 

 

Cash and cash equivalents

 

 

80

 

Accounts receivable

 

 

170

 

Inventory

 

 

66

 

Property and equipment, net

 

 

107

 

Other noncurrent assets

 

 

4

 

Identifiable intangible assets

 

 

300

 

Accounts payable

 

 

(208

)

Deferred tax liabilities

 

 

(80

)

Other current liabilities

 

 

(2

)

Total identifiable assets acquired and liabilities assumed

 

 

437

 

Goodwill

 

 

1,239

 

Noncontrolling interest

 

 

(597

)

Total purchase consideration

 

$

1,079

 

Goodwill arising from the acquisition as of January 22, 2026 of $1.2 million was attributable mainly to buyer specific synergies expected to arise from the acquisition. No goodwill from this acquisition is deductible for income tax purposes. The Company considered the contractual value of accounts receivable to be the same as the fair value and the full amount was collected. The results of Numed have been included in the condensed consolidated financial statements from the date of the acquisition.

The initial allocation of the purchase price was based upon a preliminary valuation, and accordingly, our estimates and assumptions are subject to change as we obtain additional information during the measurement period.

Renergen Acquisition

On January 6, 2026, the Company completed the acquisition of Renergen and acquired all of the issued Renergen ordinary shares from Renergen shareholders in exchange for shares of the Company's common stock at an exchange ratio of 0.09196 shares of Company common stock for each Renergen ordinary share (the “Consideration Shares”) through the implementation of the Scheme, resulting in the issuance of an aggregate of 14,270,000 Consideration Shares. As a result of the transaction, Renergen became a direct, wholly owned subsidiary of ASP Isotopes. In connection with the transaction, Renergen ordinary shares were delisted from the JSE and the Australian Securities Exchange (the "A2X").

The following table summarizes the preliminary allocation of the purchase consideration to the fair value of the assets acquired and liabilities assumed (in thousands):

 

Fair value of business combination

 

 

 

Equity consideration

 

$

92,897

 

Cash consideration

 

 

5

 

Note receivable

 

 

32,119

 

Identifiable assets acquired and liabilities assumed

 

 

 

Cash and cash equivalents

 

 

1,218

 

Restricted cash - short term

 

 

2,789

 

Accounts receivable

 

 

3,205

 

Lessor Receivable

 

 

2,434

 

Restricted cash - long term

 

 

1,650

 

Inventory

 

 

40

 

Property and equipment, net

 

 

8,621

 

Natural gas properties

 

 

188,311

 

Operating lease right-of-use asset, net

 

 

811

 

Accounts payable

 

 

(4,820

)

Finance lease liabilities – current

 

 

(55

)

Operating lease liabilities – current

 

 

(195

)

Borrowings

 

 

(58,664

)

Deferred revenue

 

 

(819

)

Finance lease liabilities – noncurrent

 

 

(204

)

Operating lease liabilities – noncurrent

 

 

(616

)

Other liabilities - long term

 

 

(3,287

)

Deferred tax liabilities

 

 

(8,122

)

Total identifiable assets acquired and liabilities assumed

 

 

132,297

 

Noncontrolling interest

 

 

(7,276

)

Total purchase consideration

 

$

125,021

 

 

Prior to closing the acquisition of Renergen, the Company advanced $30.0 million under the Renergen Loan. The financing was provided in advance of the acquisition and was contemplated by the parties as part of the overall transaction structure. Pursuant to the terms of the acquisition, the Renergen Loan was effectively settled upon consummation of the acquisition and was included as a component of the consideration transferred for the acquired business.

In accordance with ASC 805, the Company measured the consideration transferred at fair value as of the acquisition date. The fair value of the note receivable was determined to be approximately $32.1 million, which represented the outstanding balance immediately prior to closing. The Company concluded that the carrying amount approximated fair value because the note was effectively settled at

30


 

closing, the contractual terms were consistent with market participant assumptions, and there were no significant changes in credit risk or other factors that would have resulted in a material difference between carrying value and fair value.

Natural gas properties represent the estimated fair value assigned to Renergen’s interests associated with the Virginia Gas Project in South Africa. As of the Acquisition Date, natural gas properties consisted primarily of proved reserves, developed assets, wells in process, construction-in-progress related to natural gas properties and capitalized asset retirement costs.

Proved reserves represent acquisition-date amounts attributed to proved reserve interests and are depleted using the unit-of-production method based on estimated total proved reserves. Developed assets primarily represent developed production, gathering, processing and liquefaction infrastructure and are depleted using the unit-of-production method based on estimated proved developed reserves. Wells in process and construction-in-progress related to natural gas properties represent development projects that had not yet been placed into service as of the Acquisition Date and therefore were not subject to depletion. Capitalized asset retirement costs represent the asset retirement cost associated with environmental restoration and abandonment obligations and are depleted consistent with the related developed assets.

The Company engaged an independent third party valuation specialist to estimate the fair value of the acquired property and equipment. The valuation relied primarily on a third party petroleum engineer’s reserve report for reserve quantities and future production forecasts and associated cash flows.

The initial allocation of the purchase price was based upon a preliminary valuation, and accordingly, our estimates and assumptions are subject to change as we obtain additional information during the measurement period.

Renergen's principal asset is its 94.5% equity ownership in Tetra4, which owns an onshore petroleum production right and is engaged in the exploration and production of natural gas and the processing of natural gas into liquid natural gas and liquid helium in Free State Province, South Africa. Mahlako Gas Energy Limited (“MGE”) has a 5.5% equity ownership in Tetra4. MGE, Renergen and Tetra are parties to a Sale, Subscription and Shareholders’ Agreement, dated December 22, 2023 (the “SSSA”), pursuant to which MGE acquired its equity in Tetra4 for ZAR 550 million. Under the SSSA, Renergen granted to MGE a put option related to MGE's equity (the “Put Option”) exercisable upon the occurrence of a Put Option Event (as defined in the SSSA). The price payable for MGE’s equity under the Put Option is calculated pursuant to a formula set forth in the SSSA, but will be not less than the aggregate of (i) the purchase price of MGE's equity paid by MGE (ZAR 550 million) plus the face value of any claims, (ii) 3.5% of such purchase price, and (iii) MGE's documented due diligence costs.

ENDRA Merger Agreement

On June 25, 2026, the Company entered into an Agreement and Plan of Merger (the “Merger Agreement”), by and among ENDRA Life Sciences Inc., a Delaware corporation (“ENDRA”), Noble Africa LLC, a Delaware limited liability company and a direct, wholly-owned subsidiary of the Company (“Noble”), Renergen and Kruger Merger Sub LLC, a Delaware limited liability company and a direct, wholly-owned subsidiary of ENDRA (“Merger Sub”), pursuant to which Merger Sub will merge with and into Noble (the “Merger”), with Noble surviving the Merger as a direct wholly-owned subsidiary of ENDRA.

Concurrently with the entry into the Merger Agreement, Noble entered into subscription agreements (“Subscription Agreements”) with the Company and certain investors pursuant to which Noble agreed to sell approximately (i) 4,594,218 Class A Units of Noble (“Class A Units”) and/or pre-funded warrants to purchase Class A Units of Noble (the “Pre-Funded Warrants”) to certain institutional investors and other persons and (ii) 3,054,185 Class B Units of Noble (“Class B Units” and, together with the Class A Units, the “Units”) to the Company, at a price per unit of $6.57 (or $6.57 less the Pre-Funded Warrant exercise price of $0.0001 for the Pre-Funded Warrants), for aggregate gross proceeds to Noble of approximately $50 million (the “Noble Investment”). Pursuant to the Subscription Agreements, the Noble Investment shall close immediately prior to the Merger.

Additionally, prior to the effective time of the Merger (the “Effective Time”), the Company will contribute all of its equity interest in Renergen to Noble in exchange for 55,500,000 of Noble’s Class B Units (the “Contribution”). The shares of Class B Common Stock (as defined below) received by the Company upon conversion of the Class B Units in connection with the Merger will entitle the Company to 10 votes per share on all matters submitted to a vote of the stockholders of ENDRA.

Consummation of the Merger is subject to certain closing conditions, including, the approval by the shareholders of ENDRA, the receipt by Noble of the proceeds of the Noble Investment, Noble’s receipt of a written consent of the U.S. Internal Development Finance Corporation (formerly known as the Overseas Private Investment Corporation) (“OPIC”) as required under that certain Finance Agreement by and between OPIC and a subsidiary of Renergen and ENDRA’s having an amount of cash equal to or greater than $3.8 million.

The Merger Agreement may be terminated at any time prior to Closing by mutual written agreement between ENDRA and Noble or by either party if merger closing has not occurred by December 24, 2026. Either ENDRA or Noble may also terminate the Merger Agreement if the representations or warranties of the other party were inaccurate as of the date of the Merger Agreement or become inaccurate thereafter due to a breach of a covenant or agreement of that party prior to merger closing, or if the ENDRA Stockholder Matters are not approved by the ENDRA stockholders at the Special Meeting.

At or prior to the closing of the merger, the Company, ASPI South Africa Proprietary Limited, a wholly owned subsidiary of the Company (“ASPI SA”), and Renergen, shall enter into the sixth addendum to that certain ASPI Term Loan Facility, dated May 19, 2025, by and between the Company, ASPI SA and Renergen, pursuant to which the Company may provide loans to Renergen up to $200 million.

In connection with the Noble Investment, Noble entered into Subscription Agreements with certain of the Company’s directors and officers, pursuant to which Noble agreed to sell to those directors and officers Class A Units of Noble.

Goodwill

Goodwill represents the excess of the purchase price over the fair value of identifiable net assets acquired in a business combination. Goodwill is tested for impairment at least annually, or more frequently if events or changes in circumstances indicate that it is more likely than not that the carrying value of a reporting segment exceeds its fair value. No goodwill impairments were recognized for the years presented.

The carrying amount of goodwill by reporting segment as of September 30, 2026 and December 31, 2025 is as follows (in thousands):

 

31


 

 

September 30, 2026

 

 

December 31,
2025

 

Specialist isotopes and related services

 

$

6,461

 

 

$

5,177

 

Total goodwill

 

$

6,461

 

 

$

5,177

 

The changes to the carrying value of goodwill, which is included in the isotopes and related services segment, is as follows:

 

Description

 

Amount

 

Balance as of December 31, 2025

 

$

5,177

 

Acquisition of Numed

 

 

1,239

 

Translation adjustment

 

 

45

 

Balance as of September 30, 2026

 

$

6,461

 

 

Intangible Assets

Amortization expense was $40,000 and $115,000 for the three and nine months ended September 30, 2026. There was no amortization expense related to identifiable intangible assets recorded for the three and nine months ended September 30, 2025.

The changes to the carrying value of intangible assets, which is included in the specialist isotopes and related services segments, is as follows (in thousands):

 

Description

 

Amount

 

Balance as of December 31, 2024

 

$

—

 

Trademarks from ECNP acquisition

 

 

430

 

Amortization

 

 

(21

)

Balance as of December 31, 2025

 

$

409

 

Trademarks from Numed acquisition

 

 

300

 

Amortization

 

 

(115

)

Balance as of September 30, 2026

 

$

594

 

 

The following table outlines the estimated future amortization expense related to intangible assets held as of September 30, 2026 (in thousands):

 

 

Amortization Expense

 

Year Ended December 31,

 

 

 

2026

 

$

40

 

2027

 

 

161

 

2028

 

 

161

 

2029

 

 

161

 

2030

 

 

71

 

Thereafter

 

 

—

 

   Total

 

$

594

 

 

15. Equity Method and Other Investments

Investment in IsoBio, Inc.

On July 28, 2025, the Company purchased 2,000,000 shares of IsoBio, Inc. (“IsoBio”) Series Seed-1 Preferred Stock at $2.50 per share for a total aggregate purchase price of $5.0 million. IsoBio is a U.S.-based radiotherapeutic development company focused on developing a broad pipeline of mAb-based radioisotope therapeutics targeting both derisked and novel tumor antigens for patients in need of new cancer therapies.

As the owner of the Series Seed-1 Preferred Stock, the Company has the right to designate one board member. An officer and director of the Company was designated to fill that board seat. In addition, another board member of the Company is a board member, executive officer and shareholder of IsoBio.

The investment in IsoBio does not have a readily determinable fair value and is therefore measured at cost, adjusted for observable price changes and impairments, in accordance with ASC 321. As of September 30, 2026 and December 31, 2025, the carrying value of the investment was $5.6 million. This investment is included in “Other investments” on the condensed consolidated balance sheet.

The Company monitors the investment for indicators of impairment and observable price changes on a quarterly basis. If indicators of impairment exist, the Company performs a qualitative assessment to determine whether the investment is impaired and adjusts the carrying value accordingly. Therefore, the Company has included this investment in the fair value hierarchy disclosure (Note 4). During the three and nine months ended September 30, 2026, the Company did not identify any observable price changes or impairment indicators related to this investment.

Skyline Investment

In August 2025, QLE entered into a Stock Purchase Agreement to purchase all 1,995,000 of Skyline's Class B Ordinary Shares for the aggregate purchase price of $1.0 million ("Skyline Stock Agreement"). Additionally, QLE entered into a Securities Purchase Agreement to purchase (i) 454,794 Class A Ordinary Shares, (ii) a Prefunded Warrant to purchase 1,600,000 Class A Ordinary Shares at an exercise price of $0.0001 per share, (iii) a Class A Ordinary Share Purchase Warrant A to purchase up to 2,054,794 Class A Ordinary Shares at an exercise price of $0.60 per share, and (iv) a Class A Ordinary Share Purchase Warrant B to purchase 2,054,794 Class A Ordinary Shares at an exercise price of $0.65 per share, for the aggregate purchase price of $1.5 million ("Skyline Purchase Agreement"). Each Class B Ordinary Share entitled the holder thereof to twenty (20) votes on all matters subject to vote at general meetings of Skyline, which resulted in the Company having voting control of Skyline and resulted in its consolidation.

Effective as of March 29, 2026, QLE, entered into the Exchange Agreement with a third party investor in which the parties agreed to exchange 1,995,000 Class B common shares owned by QLE for 1,995,000 Class A shares owned by the third party investor, on a

32


 

one-for-one basis. This resulted in QLE's voting rights in Skyline decreasing to under 10% and the Company now accounts for the investment as an equity method investment in accordance with ASC 323. As a result of entering into the Exchange Agreement, the Company deconsolidated the results of Skyline and recorded a gain on deconsolidation of $19.3 million. The Company's total investment in Skyline was $23.8 million on the date of the Exchange Agreement. The Company has elected to account for the retained interest in Skyline under the fair value option (“FVO”). The carrying amount of the Skyline investment was $23.0 million as of September 30, 2026. The Company recognized a loss from the change in fair value of investment of $1.9 and $0.7 million for the three and nine months ended September 30, 2026, which is recorded in other income (expense) in the condensed consolidated statements of operations and comprehensive loss.

Investment in Opeongo, Inc.

On January 26, 2026, the Company purchased 4,356,918 shares of Opeongo, Inc. (“Opeongo”) Series Seed-1 Preferred Stock at $2.2952 per share for a total aggregate purchase price of $10.0 million. Opeongo is a U.S.-based biotechnology company developing novel therapeutics using extracellular matrix-modulating modulation to target fibrosis, inflammation and cancer.

As the owner of the Series Seed-1 Preferred Stock, the Company has the right to designate one board member. An officer and director of the Company was designated to fill that board seat. In addition, another board member of the Company is a board member and shareholder of Opeongo.

The investment in Opeongo does not have a readily determinable fair value and is therefore measured at cost, adjusted for observable price changes and impairments, in accordance with ASC 321. As of September 30, 2026, the carrying value of the investment was $10.0 million. This investment is included in “Other investments” on the condensed consolidated balance sheet.

The Company monitors the investment for indicators of impairment and observable price changes on a quarterly basis. If indicators of impairment exist, the Company performs a qualitative assessment to determine whether the investment is impaired and adjusts the carrying value accordingly. During the three and nine months ended September 30, 2026, the Company did not identify any observable price changes or impairment indicators related to this investment.

ENDRA Life Sciences, Inc.

On May 27, 2026, the Company purchased 66,846 shares of ENDRA Life Sciences, Inc. (“ENDRA”) common stock, 511,541 prefunded warrants to purchase shares of common stock and 1,156,774 common warrants to purchase shares of common stock for a total aggregate purchase price of $3.8 million. ENDRA is the pioneer of Thermo Acoustic Enhanced UltraSound (TAEUS ®), a technology being developed to assess tissue fat content and monitor tissue ablation during minimally invasive procedures, at the point of patient care.

The investment in ENDRA is measured at fair value, adjusted for observable price changes and impairments, in accordance with ASC 321. As of September 30, 2026, the carrying value of the investment was $4.7 million. This investment is included in “Other investments” on the condensed consolidated balance sheet.

The Company monitors the investment for indicators of impairment and observable price changes on a quarterly basis. If indicators of impairment exist, the Company performs a qualitative assessment to determine whether the investment is impaired and adjusts the carrying value accordingly. The Company recognized a gain from the change in fair value of investment of $0.9 million for the three and nine months ended September 30, 2026, which is recorded in other income (expense) in the condensed consolidated statements of operations and comprehensive loss.

 

16. Stockholders’ Equity

Preferred stock

The Company has 10,000,000 shares of preferred stock authorized, of which no shares were issued and outstanding as of September 30, 2026 and December 31, 2025.

Common stock

The Company has 500,000,000 shares of common stock authorized, of which 155,834,430 and 111,677,771 shares were outstanding as of September 30, 2026 and December 31, 2025, respectively. Common stockholders are entitled to one vote for each share of outstanding common stock held at all meetings of stockholders and written actions in lieu of meetings. Common stockholders are entitled to receive dividends for each share of outstanding common stock, if and when declared by the Board. No dividends have been declared or paid by the Company through September 30, 2026.

In June 2025, the Company issued 7,518,797 shares of common stock at $6.65 per share resulting in net proceeds of approximately $46.8 million after deducting underwriting discounts, commissions and offering expenses.

In July 2025, the Company issued 7,500,000 shares of common stock at a public offering price of $8.00 per share resulting in net proceeds of approximately $56.3 million after deducting underwriting discounts, commissions and offering expenses.

In October 2025, the Company issued 17,167,380 shares of common stock at a public offering price of $12.25 per share resulting in net proceeds of approximately $199.3 million after deducting underwriting discounts, commissions and offering expenses.

In January 2026, the Company issued 14,270,000 shares of common stock in connection with the acquisition of Renergen.

In July 2026, the Company issued 23,160,682 shares of common stock with a fair value of $106.1 million in exchange for $109.2 million in aggregate principal amount of the outstanding 2025 Convertible Notes (See Note 9).

Treasury shares are recorded at cost and include forfeited shares from the Company's stock compensation plans. There were 168,274 shares forfeited and transferred to treasury stock through September 30, 2026.

Common Stock Warrants

In May 2025, a warrant to purchase 1,294,778 shares of common stock was exercised and the Company received gross proceeds of approximately $4.9 million. In July and September 2025, cashless exercises of warrants to purchase 151,741 shares of common stock were executed, resulting in the issuance of 123,497 shares of common stock. As of September 30, 2026 and December 31, 2025, there were warrants to purchase 69,778 shares of common stock outstanding.

33


 

17. Stock Compensation Plan

Equity Incentive Plans

In October 2021, the Company adopted the 2021 Stock Incentive Plan (“2021 Plan”) that provided for the issuance of common stock to employees, nonemployee directors, and consultants. Recipients of incentive stock options are eligible to purchase shares of common stock at an exercise price equal to no less than the estimated fair market value of such stock on the date of grant. The 2021 Plan provided for the grant of incentive stock options, non-statutory stock options, restricted stock, restricted stock units, stock awards and stock appreciation rights. The maximum contractual term of options granted under the 2021 Plan is ten years. The maximum number of shares initially available for issuance under the 2021 Plan was 6,000,000. No further options are available to be issued under the 2021 Plan.

In November 2022, the Company adopted the 2022 Equity Incentive Plan (“2022 Plan”) that provides for the issuance of common stock to employees, nonemployee directors, and consultants. Recipients of incentive stock options are eligible to purchase shares of common stock at an exercise price equal to no less than the estimated fair market value of such stock on the date of grant. The 2022 Plan provides for the grant of incentive stock options, non-statutory stock options, restricted stock, restricted stock units, stock awards and stock appreciation rights. The maximum contractual term of options granted under the 2022 Plan is ten years. The number of shares of the Company’s common stock initially reserved for issuance under the 2022 Plan is equal to 5,000,000, subject to an annual increase, to be added on the first day of each fiscal year, beginning with the fiscal year ending December 31, 2023 and continuing until, and including, the fiscal year ending December 31, 2033, equal to the lesser of 5% of the number of shares of the Company’s common stock outstanding on such date or an amount determined by the Company’s board of directors. On January 1, 2026, the Company added 5,583,889 shares to the 2022 Plan. As of September 30, 2026, 1,282,608 shares remain available for future grant under the 2022 Plan.

2024 Inducement Equity Incentive Plan

In June 2024, the Company adopted the 2024 Inducement Equity Incentive Plan (“2024 Plan”). The 2024 Plan will be used exclusively for the grant of equity awards to individuals who were not previously employees or directors of the Company, or following a bona fide period of non-employment, as an inducement material to such individuals entering into employment with the Company, pursuant to Nasdaq Listing Rule 5635(c)(4). Recipients of stock options are eligible to purchase shares of common stock at an exercise price equal to no less than the estimated fair market value of such stock on the date of grant. The 2024 Plan provides for the grant of non-statutory stock options, restricted stock, restricted stock units, stock awards and stock appreciation rights. The maximum contractual term of options granted under the 2024 Plan is ten years. The number of shares of the Company’s common stock initially reserved for issuance under the 2024 plan is equal to 2,500,000. As of September 30, 2026, 15,000 shares remain available for future grant under the 2024 Plan.

2025 Inducement Equity Incentive Plan

On July 16, 2025, upon recommendation of the Compensation Committee of the Company’s Board, the Board approved and adopted the Company’s 2025 Inducement Equity Incentive Plan (the “Inducement Equity Plan”), and subject to the adjustment provisions of the Inducement Equity Plan, reserved 2,000,000 shares of Common Stock for issuance of equity awards under the Inducement Equity Plan.

The Inducement Equity Plan was approved and adopted without stockholder approval pursuant to Nasdaq Listing Rule 5635(c)(4). The Inducement Equity Plan provides for grants of stock options, stock appreciation rights, restricted stock, restricted stock units, performance awards (consisting of performance shares or performance units) and other cash-based or stock-based awards (each, an “Inducement Award”). In addition, the Board also approved and adopted forms of Notice of Grant of Restricted Stock and Restricted Stock Agreement, and Notice of Grant of Stock Option and Stock Option Agreement for use with the Inducement Equity Plan. The terms and conditions of the Inducement Equity Plan are intended to comply with the Nasdaq inducement award rules.

In accordance with Nasdaq Listing Rule 5635(c)(4), the only persons eligible to receive grants of Inducement Awards are individuals who were not previously employees or directors of the Company (or following a bona fide period of non-employment), as an inducement material to the individuals’ entry into employment with the Company. As of September 30, 2026, 1,080,000 shares remain available for future grant under the Inducement Equity Plan.

QLE 2024 Equity Incentive Plan

In March 2024, the Company adopted the QLE 2024 Equity Incentive Plan (“QLE 2024 Plan”). The QLE 2024 Plan provides for the grant of incentive stock options, non-statutory stock options, restricted stock, restricted stock units, stock awards, performance awards and stock appreciation rights to employees, nonemployee directors, and consultants. The maximum contractual term of options granted under the QLE 2024 Plan is ten years and incentive stock options granted under the QLE 2024 Plan shall not exceed 50% of the maximum number of shares or units of common equity that may be issued under the QLE 2024 Plan. The maximum number of shares or units of QLE’s common equity that may be issued under the QLE 2024 Plan is equal to 15% of the common equity deemed outstanding as of the effective date of the QLE 2024 Plan. As of September 30, 2026, no common equity deemed outstanding remain available for future grant under the QLE 2024 Plan.

In September 2025, QLE granted restricted stock units (“RSUs”) totaling 11% of the common equity deemed outstanding to certain officers, employees and directors of QLE and in October 2025, QLE granted RSU's totaling 4% to American Ventures (Note 13). The RSUs will vest subject to the occurrence of a Listing Event and, if applicable, an additional service-based vesting condition. A Listing Event shall mean the consummation of any of the following transactions by QLE, a corporate successor to QLE or a holding company established with respect to QLE’s equity securities in connection with any of the following transactions (a “Public Issuer”): (i) a listing of common equity of QLE (or the common equity of such Public Issuer) through acquisition by or merger of such Public Issuer with a special purpose acquisition company or another entity listed on the NYSE or NASDAQ, (ii) a firm commitment underwritten public offering pursuant to an effective registration statement under the Securities Act and in connection with such offering the common equity of QLE is listed for trading on the Nasdaq, the NYSE or another exchange or marketplace approved by the Board, or (iii) a direct listing of common equity of QLE (or the common equity securities of the Public Issuer) on the NYSE or Nasdaq.

Since the vesting of the RSUs is based on a liquidity event, no compensation cost will be recognized until the Performance Goal (Listing Event) is consummated. However, the fair value of the awards is calculated at the date of grant, which results in a total fair value of approximately $37.4 million.

34


 

Stock Options

The following table sets forth the activity for the Company’s stock options during the periods presented:

 

 

Number of
Options

 

 

Weighted-
Average
Exercise
Price
per Share

 

 

Weighted
Average
Remaining
Contractual
Term
(in Years)

 

 

Aggregate
Intrinsic
Value

 

Outstanding as of December 31, 2025

 

 

808,000

 

 

$

3.06

 

 

 

7.3

 

 

$

2,020,050

 

Granted

 

 

110,000

 

 

$

2.60

 

 

 

 

 

 

 

Exercised

 

 

(74,266

)

 

$

2.18

 

 

 

 

 

 

 

Forfeited

 

 

(15,394

)

 

$

6.16

 

 

 

 

 

 

 

Outstanding as of September 30, 2026

 

 

828,340

 

 

$

3.02

 

 

 

7.0

 

 

$

351,235

 

Exercisable as of September 30, 2026

 

 

605,487

 

 

$

2.40

 

 

 

6.1

 

 

$

346,646

 

Vested or expected to vest as of September 30, 2026

 

 

828,340

 

 

$

3.02

 

 

 

7.0

 

 

$

351,235

 

Options with a weighted average grant date fair value of $2.00 were granted for the nine months ended September 30, 2026. There were options to purchase 74,266 shares exercised for proceeds of $0.2 million for the nine months ended September 30, 2026.

The Company recorded stock-based compensation expense from options of $0.1 million and $(1,239) for the three months ended September 30, 2026 and 2025, respectively. The Company recorded stock-based compensation expense from options of $0.2 million and $0.3 million for the nine months ended September 30, 2026 and 2025 respectively. As of September 30, 2026, there was $0.7 million of unrecognized stock-based compensation expense related to non-vested stock options granted under the Plan.

Stock Awards

The Company recorded stock-based compensation expense from stock awards totaling $9.5 million and $4.5 million for the three months ended September 30, 2026 and 2025, respectively. The Company recorded stock-based compensation expense from stock awards totaling $18.4 million and $10.5 million for the nine months ended September 30, 2026 and 2025. As of September 30, 2026, there is $42.4 million of unrecognized stock-based compensation expense related to the non-vested portion of restricted stock awards that is expected to be recognized over 2.5 years.

The following table summarizes vesting of restricted common stock:

 

 

Number of
Shares

 

 

Weighted
Average Grant
Date Fair
Value
Per Share

 

Unvested as of December 31, 2025

 

 

4,169,955

 

 

$

5.68

 

Granted

 

 

6,823,555

 

 

$

5.96

 

Vested

 

 

(2,486,774

)

 

$

6.67

 

Forfeited

 

 

(171,844

)

 

$

7.06

 

Unvested as of September 30, 2026

 

 

8,334,892

 

 

$

5.58

 

Stock-based Compensation Expense

Stock-based compensation expense for all stock awards recognized in the accompanying condensed consolidated statements of operations and comprehensive loss is as follows:

 

 

Three Months Ended September 30,

 

 

Nine Months Ended September 30,

 

 

 

2026

 

 

2025

 

 

2026

 

 

2025

 

Selling, general and administrative

 

$

9,411

 

 

$

4,485

 

 

$

17,916

 

 

$

10,683

 

Research and development

 

 

192

 

 

 

(1

)

 

 

641

 

 

 

120

 

Total

 

$

9,603

 

 

$

4,484

 

 

$

18,557

 

 

$

10,803

 

 

18. Net Loss Per Share

The Company has reported losses since inception and has computed basic net loss per share attributable to common stockholders by dividing net loss attributable to common stockholders by the weighted-average number of shares of Common Stock outstanding for the period, without consideration for potentially dilutive securities. The Company computes diluted net loss per share of Common Stock after giving consideration to all potentially dilutive shares of common stock, including options to purchase common stock and warrants to purchase common stock, outstanding during the period determined using the treasury-stock and if-converted methods, except where the effect of including such securities would be antidilutive. Because the Company has reported net losses since inception, these potential shares of Common Stock have been anti-dilutive and basic and diluted loss per share were the same for all periods presented.

35


 

The following table sets forth the computation of basic and diluted net loss per share for the three and nine months ended September 30, 2026 and 2025:

 

 

Three Months Ended September 30,

 

 

Nine Months Ended September 30,

 

 

2026

 

 

2025

 

 

2026

 

 

2025

 

Numerator:

 

 

 

 

 

 

 

 

 

 

 

 

Net loss from continuing operations

 

$

(30,868

)

 

$

(13,184

)

 

$

(91,567

)

 

$

(96,802

)

Income from discontinued operations

 

 

—

 

 

 

290

 

 

 

19,585

 

 

 

290

 

Less: Net loss attributable to noncontrolling interests

 

 

(497

)

 

 

(277

)

 

 

(1,149

)

 

 

(387

)

Net loss attributable to ASP Isotopes Inc. shareholders

 

$

(30,371

)

 

$

(12,617

)

 

$

(70,833

)

 

$

(96,125

)

Denominator:

 

 

 

 

 

 

 

 

 

 

 

 

Weighted average common stock outstanding, basic and diluted

 

 

143,385,783

 

 

 

88,552,309

 

 

 

128,891,373

 

 

 

75,985,507

 

Net (loss) income per share, basic and diluted:

 

 

 

 

 

 

 

 

 

 

 

 

Continuing operations

 

$

(0.22

)

 

$

(0.15

)

 

$

(0.71

)

 

$

(1.27

)

Discontinued operations

 

$

-

 

 

$

-

 

 

$

0.15

 

 

$

-

 

Attributable to ASP Isotopes Inc. shareholders

 

$

(0.21

)

 

$

(0.14

)

 

$

(0.55

)

 

$

(1.27

)

The following table sets forth the potentially dilutive securities that have been excluded from the calculation of diluted net loss per share because to include them would be anti-dilutive:

 

 

As of September 30,

 

 

2026

 

 

2025

 

Options to purchase common stock

 

 

828,340

 

 

 

606,000

 

Restricted stock

 

 

8,334,892

 

 

 

4,684,286

 

Warrants to purchase common stock

 

 

69,778

 

 

 

69,778

 

Total shares of common stock equivalents

 

 

9,233,010

 

 

 

5,360,064

 

 

19. Income Taxes

The Company’s effective tax rate for the three months ended September 30, 2026 and 2025 was -3.8% and -0.4%. The Company’s effective tax rate for the nine months ended September 30, 2026 and 2025 was -1.1% and -0.1%. The effective tax rate for the three months ended September 30, 2026 and 2025 and the nine months ended September 30, 2026 and 2025 varied from the federal statutory rate primarily due to losses in jurisdictions for which a valuation allowance is recorded.

The Company recognizes a tax benefit from an uncertain tax position when it is more likely than not that the position will be sustained upon examination, including resolutions of any related appeals or litigation processes, based on the technical merits. Income tax positions must meet a more likely than not recognition threshold to be recognized. The Company’s practice is to recognize interest and/or penalties related to income tax matters in income tax expense. The Company had no accrual for interest and penalties on the Company’s balance sheets and has not recognized interest and/or penalties in the condensed consolidated statements of operations and comprehensive loss for the three and nine months ended September 30, 2026. Uncertain tax positions are evaluated based upon the facts and circumstances that exist at each reporting period. Subsequent changes in judgment based upon new information may lead to changes in recognition, derecognition, and measurement. Adjustments may result, for example, upon resolution of an issue with the taxing authorities or expiration of a statute of limitations barring an assessment for an issue. As of September 30, 2026 and December 31, 2025, there were no uncertain tax positions.

As of September 30, 2026, the Company did not recognize any interest and penalties associated with unrecognized tax benefits. Due to net operating losses incurred, tax years from inception remain open to examination by the Federal and State taxing jurisdictions to which the Company is subject. The Company is not currently under Internal Revenue Services (IRS), state or local tax examination.

Ownership changes, as defined in the Internal Revenue Code (“IRC”), may limit the amount of net operating loss carryforwards that can be utilized annually to offset future taxable income pursuant to IRC Section 382 or similar provisions. Subsequent ownership changes could further affect the limitation in future years. The Company has not completed a study to assess whether a change of control has occurred or whether there have been multiple changes of control since the Company’s formation due to the significant complexity and cost associated with such study and because there could be additional changes in control in the future. As a result, the Company is not able to estimate the effect of the change in control, if any, on the Company’s ability to utilize net operating loss and research and development credit carryforwards in the future.

20. Related Party Transactions

PET Labs has an operating lease for office and production space in Pretoria, South Africa with monthly payment of about $30,000 per month and a term set to expire in March 2056. The sole owner of the facility under the lease agreement is Dr. Gerdus Kemp, an officer of PET Labs and an employee of ASP UK.

In connection with the Noble Investment, Noble entered into Subscription Agreements with certain of the Company’s directors and officers, pursuant to which Noble agreed to sell to those directors and officers Class A Units of Noble.

21. Discontinued Operations

Effective as of March 29, 2026, the Company entered into the Exchange Agreement and completed the deconsolidation of Skyline. The Company retained approximately 8.6% percent of the outstanding Class A ordinary and preferred shares of Skyline immediately following the deconsolidation. The accounting requirements for reporting the separation of Skyline as a discontinued operation were met when the separation was completed. Accordingly, the historical results of Skyline have been presented as discontinued operations and, as such, have been excluded from continuing operations and segment results for all periods presented. Prior to the separation, Skyline was reported within the construction services segment.

36


 

The following table presents the major categories of income from discontinued operations for the nine months ended September 30, 2026 (in thousands):

 

 

Nine Months Ended

 

 

 

September 30, 2026

 

Gross profit

 

$

444

 

Selling, general and administrative expenses

 

 

(2,935

)

Change in fair value of investments

 

 

6,162

 

Other expenses, net

 

 

(124

)

Income from discontinued operations before income taxes

 

 

3,547

 

Income tax expense

 

 

(17

)

Net income before allocation to noncontrolling interests

 

 

3,530

 

Less: Net income attributable to noncontrolling interests

 

 

3,281

 

Income from discontinued operations

 

$

249

 

There was no income from discontinued operations for the three months ended September 30, 2026. As the controlling interest of Skyline was not acquired until August 2025, no income was recognized from Skyline for the three and nine months ended September 30, 2025.

The following table presents the major classes of assets and liabilities of discontinued operations as of December 31, 2025 (in thousands):

 

 

December 31,
2025

 

Cash and cash equivalents

 

$

5,991

 

Accounts receivable

 

 

16,804

 

Prepaid and other current assets

 

 

8,895

 

Total current assets of discontinued operations

 

$

31,690

 

Property, plant and equipment, net

 

 

161

 

Operating lease right-of-use lease assets

 

 

48

 

Intangibles

 

 

1,069

 

Goodwill

 

 

3,393

 

Equity investments

 

 

1,327

 

Other investments

 

 

40,399

 

Other noncurrent assets

 

 

4,491

 

Total non-current assets of discontinued operations

 

 

50,888

 

Total assets of discontinued operations

 

$

82,578

 

Accounts payable

 

 

1,941

 

Accrued expenses

 

 

1,809

 

Notes payable -current

 

 

12,301

 

Operating lease liabilities - current

 

 

40

 

Due to related parties

 

 

4,162

 

Other current liabilities

 

 

1,537

 

Total current liabilities of discontinued operations

 

 

21,790

 

Deferred Tax Liabilities

 

 

102

 

Total non-current liabilities of discontinued operations

 

 

102

 

Total liabilities of discontinued operations

 

$

21,892

 

The following table presents selected financial information related to cash flows from discontinued operations for the nine months ended September 30, 2026 (in thousands):

 

 

Nine Months Ended

 

 

 

September 30, 2026

 

Net cash used in operating activities

 

$

(1,121

)

Net cash provided by financing activities

 

$

45,886

 

The total net impact to stockholders' equity as a result of the separation was a reduction of $66.0 million, which has been reflected as a reduction of $86.8 million to noncontrolling interest and an increase to accumulated deficit and accumulated other comprehensive income/(loss) of $19.3 million and $1.5 million, respectively, in the condensed consolidated statement of equity as of September 30, 2026. The Company retained 8.6% of the outstanding Class A ordinary and preferred shares of Skyline, which had a net book value of $23.8 million as of March 28, 2026, the separation date.

22. Subsequent Events

The Company has evaluated subsequent events through November 16, 2026, the date on which the accompanying condensed consolidated financial statements were issued and concluded that no subsequent events have occurred that require disclosure except as described below.

First Amendment to Merger Agreement. As previously disclosed, on June 25, 2026, the Company entered into an Agreement and Plan of Merger (the “Merger Agreement”), by and among ENDRA Life Sciences Inc., a Delaware corporation (“ENDRA”), Noble Africa LLC, a Delaware limited liability company and a direct, wholly-owned subsidiary of the Company (“Noble”), Renergen and Kruger Merger Sub LLC, a Delaware limited liability company and a direct, wholly-owned subsidiary of ENDRA (“Merger Sub”), pursuant to which Merger Sub will merge with and into Noble (the “Merger”), with Noble surviving the Merger as a direct wholly-owned subsidiary of ENDRA.

On October 1, 2026, the Company, ENDRA, Noble, Renergen and Merger Sub entered into that certain First Amendment to the Merger Agreement (the “Amendment”) to, among other things, (i) amend ENDRA’s disclosure letter to permit ENDRA to amend the Pre-Funded Common Stock Purchase Warrant (the “Pre-Funded Warrant”) and Common Stock Purchase Warrant (the “Common

37


 

Warrant” and, together with the Pre-Funded Warrant, the “Warrants”), each issued by ENDRA as of May 27, 2026 to LHE LNG Holdings LLC, a direct, wholly-owned subsidiary of the Company (the “ASPI ENDRA Purchaser”), (ii) remove the requirement that the board of directors immediately following the closing of the Merger be classified into three separate classes, (iii) revise the minimum cash closing condition to reflect a minimum cash requirement of $3,800,002.59, less certain agreed-upon expenses to permit ENDRA to engage in certain investor relations activities, (iv) replace the form of ENDRA’s Fifth Amended and Restated Certificate of Incorporation with an updated form that removes the classified board provisions and other provisions that would have required a supermajority vote of ENDRA’s stockholders to be approved, (v) amend Noble Africa’s disclosure letter to permit Renergen to enter into a fifth addendum to that certain Term Loan Facility Agreement, dated as of May 19, 2025, by and between Renergen, ASPI and ASPI South Africa Proprietary Limited, a wholly-owned subsidiary of ASPI (the “ASPI Term Loan Facility”), which would increase Renergen’s borrowing capacity from ASPI from $80 million to up to $120 million and (vi) contemplate a sixth addendum to the ASPI Term Loan Facility to be entered into at or prior to the closing of the Merger, which would further increase Renergen’s borrowing capacity from ASPI from $120 million to up to $200 million. Except as expressly modified by the Amendment, the terms of the Merger Agreement were ratified and remain in full force and effect.

38


 

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations.

You should read the following discussion and analysis of our financial condition and results of operations together with our condensed consolidated financial statements and related notes included in this Quarterly Report on Form 10-Q and the consolidated financial statements and related notes thereto contained in our Annual Report on Form 10-K for the year ended December 31, 2025 filed with the Securities and Exchange Commission (the “SEC”) on April 10, 2026 and Amendment No. 1 to our Annual Report on Form 10-K/A filed with the SEC on April 30, 2026 (as amended, the “Annual Report”), along with Management’s Discussion and Analysis of Financial Condition and Results of Operations contained in the Annual Report. The Annual Report is accessible on the SEC’s website at www.sec.gov and on our website at www.aspisotopes.com. Some of the information contained in this discussion and analysis or set forth elsewhere in this Quarterly Report, including information with respect to our plans and strategy for our business and related financing, includes forward-looking statements that involve risks and uncertainties. As a result of many factors, including those factors set forth in the section entitled “Risk Factors” in the Annual Report and this Quarterly Report on Form 10-Q, and the section entitled “Special Note Regarding Forward-Looking Statements” above, our actual results could differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis. You should carefully read the section entitled “Risk Factors” in the Annual Report and this Quarterly Report on Form 10-Q, and the section entitled “Special Note Regarding Forward-Looking Statements” above to gain an understanding of the important factors that could cause actual results to differ materially from our forward-looking statements.

Overview

We are an advanced materials company dedicated to the development of a differentiated isotope enrichment platform to strengthen global supply chain access to critical materials used in nuclear medicine, next-generation semiconductors, and nuclear energy. Our proprietary enrichment technologies, the Aerodynamic Separation Process (“ASP technology”) and QE technology, are designed to enable the production of isotopes for a range of industrial and advanced technology applications. Our initial focus is on the production and commercialization of enriched Carbon-14 (“C-14”), Silicon-28 (“Si-28”) and Ytterbium-176 (“Yb-176”). Our commercial radiodiagnostic activities are currently focused on radiopharmaceutical products used in positron emission tomography ("PET") and single-photon emission computed tomography ("SPECT") imaging, as well as therapeutic radiopharmaceuticals used in the treatment of oncology indications.

We commenced commercial production of enriched isotopes at both of our ASP enrichment facilities located in Pretoria, South Africa during the first half of 2025. However, we have not generated any revenue from the sale of our enriched isotopes as of September 30, 2026. Our first ASP enrichment facility is designed to enrich light isotopes, such as C-14 and C-12. The second ASP enrichment facility, which is substantially larger than the first, should have the potential to enrich kilogram quantities of relatively heavier isotopes, including but not limited to Si-28. Depending on the timing and the quality of the feedstock received from our customer, our initial shipments of enriched C-14 may occur in 2027. We are targeting initial shipments of enriched Si-28 in the fourth quarter of 2026. We have also completed the commissioning phase of our third enrichment facility, a QE technology facility, which is our first laser-based enrichment plant. We are targeting initial shipments of Yb-176 in 2027.

In addition, we have started planning additional isotope enrichment plants both in South Africa and in other jurisdictions, including Iceland and the United States. We believe the C-14 we may produce using the ASP technology could be used in the development of new pharmaceuticals and agrochemicals. We believe the Si-28 we may produce using the ASP technology may be used to create advanced semiconductors and in quantum computing. We believe the Yb-176 we may produce using the QE technology may be used to create radiotherapeutics that treat various forms of oncology. We are considering the future development of the ASP technology for the separation of Zinc-68 and Xenon-129/136 for potential use in the healthcare end market, Germanium 70/72/74 for potential use in the semiconductor end market, and Chlorine -37 for potential use in the nuclear energy end market. We are also considering the future development of QE technology for the separation of Nickel-64, Gadolinium-160, Ytterbium-171, Lithium-6 and Lithium-7.

QLE, our subsidiary, is currently pursuing an initiative to apply our enrichment technologies to the enrichment of Uranium-235 (“U-235”) in South Africa. We believe that the U-235 QLE may produce has the potential to be commercialized as a nuclear fuel component for use in the new generation of high-assay low-enriched uranium (“HALEU”)-fueled small modular reactors that are now under development for commercial and government uses. In furtherance of our uranium enrichment initiative in South Africa, we have entered into certain definitive agreements with TerraPower, LLC (“TerraPower”), including a term loan subject to conditions to support construction of a new uranium enrichment facility at Pelindaba, South Africa and supply agreements for the future supply of HALEU to TerraPower, as a customer. In addition, QLE’s South African subsidiary has entered into a Pre-Implementation Services Contract Agreement (“Services Contract”) with The South African Nuclear Energy Corporation (“Necsa”), a South African state-owned company responsible for undertaking and promoting research and development in the field of nuclear energy and radiation sciences, pursuant to which Necsa has agreed to provide to QLE’s South African subsidiary certain facilities, infrastructure, utilities and services related to the siting, design, construction, commission and operation of an enrichment facility on the Necsa site in Pelindaba. In the period since our inception to date, we have not applied our enrichment technologies to the enrichment of U-235, nor received permission or regulatory approval to conduct testing of our enrichment technologies on U-235, except for the activities contemplated by the Services Contract with Necsa. Our expectation that QLE’s initiative to apply our enrichment technologies to the enrichment of U-235 could be successful is based upon research conducted by certain of our scientists prior to joining us, as well as the demonstrated effectiveness of QE technology on Yb-176.

We acquired Renergen in January 2026 and issued 14,270,000 Consideration Shares in connection with this acquisition. Renergen is South Africa’s leading onshore natural gas explorer and the first integrated producer of both liquid helium and LNG, both of which are produced from the natural gas reserve base that underpins Renergen’s Virginia Gas Project. The Virginia Gas Project includes (i) the liquefaction of natural gas into LNG, (ii) the separation of helium from natural gas, and (iii) the further liquefaction of helium into 99.999% pure liquid helium. This liquefaction and separation takes place at Renergen’s Virginia Gas Plant. Renergen’s principal asset is its 94.5% equity ownership in Tetra4, which holds an onshore petroleum production right and is the entity developing the Virginia Gas Project.

QLE entered into the Securities Exchange Agreement with a third party, effective as of March 29, 2026, which resulted in the deconsolidation of Skyline (Note 21). QLE retained approximately 8.6% percent of the outstanding Class A ordinary and preferred shares of Skyline immediately following deconsolidation.

39


 

Our Subsidiaries and Segments

We operate our proprietary enrichment activities principally through our subsidiaries. ASP Isotopes Guernsey Limited (the holding company for our subsidiaries in the Cayman Islands, South Africa, Iceland and the United Kingdom) is focused on the development and commercialization of high-value, low-volume isotopes for highly specialized end markets (such as C-14, Si-28, and Yb-176). ASP Isotopes UK Ltd is the owner of our technology.

QLE. In September 2023, we formed QLE, which also has subsidiaries in the United Kingdom (Quantum Leap Energy Limited) and South Africa (Quantum Leap Energy (Pty) Limited), to focus on the development and commercialization of advanced nuclear fuels, such as HALEU and Lithium-6. QLE’s direct wholly owned subsidiary QLE UK, has its operations in the United Kingdom. QLE UK’s direct wholly owned subsidiary, QLE South Africa, has its operations in South Africa. QLE also formed QLE SPE Borrower, as a wholly owned subsidiary to act as a special purpose borrower for a loan transaction with TerraPower, a US nuclear innovation company. The QLE SPE Borrower has formed a subsidiary in South Africa to act as the project company for a proposed new uranium enrichment facility at Pelindaba, South Africa.

QLE’s mission is to address perceived gaps in the nuclear fuel cycle, promote safe nuclear power, and enhance the sustainability of the nuclear fuel cycle for advanced nuclear reactors and fusion systems, as well as the existing nuclear fleet. We believe that many advanced nuclear reactors, including SMRs, will rely on fuels with higher uranium enrichment levels, specifically HALEU, which we intend to produce. QLE also intends to produce high-isotopic purity fuel feedstock, such as Lithium-6, for fusion reactors, and by extension, Lithium-7 for Light Water Reactor control. These fuels may enable greater efficiency, compact reactor footprints, and lengthened operational cycles between refueling. Given the flexible nature of our enrichment technology and integrated value chain approach, QLE also intends to make available LEU+ to the existing fleet of nuclear reactors currently running on LEU, thus enabling existing reactors to lengthen the time between refueling, cut costs and boost power output.

As previously announced, our board of directors intends to pursue the separation of our Nuclear Fuels business and Specialist Isotopes and Related Services business into two independent companies. The regulatory landscape and supply chain for nuclear fuel production differs significantly from that of medical isotopes, hence we and QLE have different business models and we believe that both companies would benefit if QLE is independently managed and financed. We plan to effect the separation through a listing of QLE in a transaction that results in QLE existing as a separate public company with shares listed on a U.S. national securities exchange and a portion of QLE’s common equity being distributed to our stockholders as of a to-be-determined future record date. While we currently believe that a listing of QLE as a separate public company is the most likely separation transaction, our board of directors remains committed to maximizing shareholder value creation, and will continue to evaluate other options for separation to maximize shareholder value.

We entered into a number of agreements with QLE, including a License Agreement, pursuant to which QLE has licensed from us the rights to technologies and methods used to separate U-235 and Lithium-6 (including but not limited to the QE and ASP technologies) in exchange for a perpetual royalty in the amount of 10% of all future QLE revenues, and an EPC Services Framework Agreement, pursuant to which we will provide services for the engineering, procurement and construction of one or more turnkey U-235 and Lithium-6 enrichment facilities in locations to be identified by QLE and owned or leased by QLE, and commissioning, start-up and test services for each such facility, subject to the receipt of all applicable regulatory approvals, permits, licenses, authorizations, registrations, certificates, consents, orders, variances and similar rights.

PET Labs. We have a 51% ownership stake in PET Labs, a South African radiopharmaceutical operations company focused on the production of fluorinated radioisotopes and active pharmaceutical ingredients, through which we entered the downstream medical isotope production and distribution market. Under the terms of the Share Purchase Agreement pursuant to which we acquired the shares in PET Labs, we agreed to pay a total of $2.0 million for the shares in two installments, which has been paid in full as of December 2025. In addition, we have an option to purchase the remaining 49% of the outstanding equity in PET Labs, exercisable until January 31, 2027, for $2.2 million.

East Coast Nuclear Pharmacy. In October 2025, we completed the acquisition of East Coast Nuclear Pharmacy ("ECNP"). Pursuant to the terms of the agreement, we acquired 100% of the issued and outstanding membership interests for total purchase consideration of $2.5 million of which $2.0 million was paid up front in cash and the remaining $0.5 million was deferred through the issuance of notes payable that were repaid in June 2026.

Numed Diagnostics, LLC ("Numed"). In January 2026, we acquired 60% of the issued and outstanding membership interests of Numed for $0.8 million. Numed is an independent radiopharmacy dedicated to nuclear medicine and the science of radiopharmaceutical production. In addition to the purchase consideration, we have an option to purchase the remaining 40% of the issued and outstanding membership interests within two years following the closing for an agreed consideration totaling $0.5 million.

Renergen Acquisition. On January 6, 2026, we acquired all of the issued and outstanding Renergen ordinary shares from Renergen shareholders in exchange for shares of our common stock through the implementation of the Scheme in accordance with Sections 114 and 115 of the South African Companies Act, No. 71 of 2008, resulting in the issuance of an aggregate of 14,270,000 shares of our common stock. As a result of the transactions contemplated by the Scheme, the Renergen ordinary shares, which were publicly traded on the Johannesburg Stock Exchange (JSE: REN) and the Australian Securities Exchange (ASX:RLT), were delisted and Renergen became a wholly owned subsidiary of ASP Isotopes.

Renergen is South Africa’s leading onshore natural gas explorer and the first integrated producer of both liquid helium and LNG, both of which are produced from the large natural gas reserve base that underpins Renergen’s Virginia Gas Project. The Virginia Gas Project includes (i) the liquefaction of natural gas into LNG, (ii) the separation of helium from natural gas, and (iii) the further liquefaction of helium into 99.999% pure liquid helium. This liquefaction and separation takes place at Renergen’s Virginia Gas Plant in the Free State Province of South Africa. Based on the drilled and flow-tested wells, Renergen’s average helium concentration exceeds 3.0%, which is well above typical conventional natural gas reservoirs containing helium in small concentrations (less than 0.5%).

Renergen’s principal asset is its 94.5% equity ownership in Tetra4, which holds South Africa’s first and only onshore petroleum Production Right and is the entity developing the Virginia Gas Project. Phase 1 of the Virginia Gas Project has commenced commercial LNG operations. The Virginia Gas Project benefits from favorable supply and demand trends in both the LNG and liquid helium sectors. The LNG is and will continue to be sold domestically in South Africa into a market suffering energy and natural gas shortages, and we

40


 

plan to sell helium directly to global customers at a time when the world is suffering helium supply shortages, which have been further exacerbated by the ongoing United States-Israel-Iran conflict and associated disruptions to shipping through the Strait of Hormuz. The global helium supply chain has been materially disrupted by these geopolitical developments, with repairs to affected production infrastructure expected to take years rather than months. In addition, in April 2026, Russia introduced export controls on helium to maintain domestic supply, further constraining global availability. We believe that the U.S. International Development Finance Corporation (“DFC”) previously indicated its willingness to consider supporting the funding of Phase 2 of the Virginia Gas Project for up to $500 million as part of the U.S.’s initiative to ensure new helium supply comes online as aerospace and the semiconductor industry increase helium requirements in the face of diminished supply, while increasing South Africa’s domestic energy supply.

Helium is a vital and irreplaceable element in many modern industries because it is both chemically and electrically inert and, when in liquid form, is the coldest substance known to man at 4 degrees Kelvin (minus 454.3 degrees Fahrenheit). For these reasons, it can be used in the manufacture of semiconductors, to purge laboratory or manufacturing environments, act as a fuel propellant for other cryogenic fuels, and/or provide deep cryogenic cooling. It is commonly used in space exploration and rocketry, high-level physics experiments (e.g., particle accelerators, quantum mechanics), medical science within MRI devices, fiber optic cable production, commercial diving gas, specialized welding, coolant for nuclear power stations and lifting balloons.

We believe that Renergen’s LNG supply can play an important role in reducing South Africa's relatively high carbon emissions by being the first, and currently the only, LNG supplier in the country. According to Energy Institute (2024), coal has a 69% share of national primary energy consumption, with gas only around 3.5%. As such, according to the World Bank, South Africa ranks as the fifth-worst carbon emissions country per kilogram per purchasing power parity of gross domestic product (“GDP”). This ranking is largely due to South Africa’s high reliance on low-grade coal to provide electricity, supplemented by Sasol’s use of coal to liquids technology. Sasol Limited is one of the country’s largest energy suppliers and operator of the natural gas pipeline supplying gas from Mozambique into Johannesburg. LNG is a significantly lower carbon-emitting fuel than either of coal (by 50%) and diesel (25%), upon combustion. Therefore, the introduction of Renergen’s LNG into South Africa’s energy supply mix, including the possible direct substitution of Renergen’s LNG for first diesel, and then potentially coal, may help reduce South Africa’s overall carbon emissions intensity as the country moves towards its net zero carbon emissions targets by 2050.

Mahlako Gas Energy Limited (“MGE”) has a 5.5% equity ownership in Tetra4. MGE, Renergen and Tetra are parties to a Sale, Subscription and Shareholders’ Agreement, dated December 22, 2023 (the “SSSA”), pursuant to which MGE acquired its equity in Tetra4 for ZAR 550 million. Under the SSSA, Renergen granted to MGE a put option related to MGE's equity (the “Put Option”) exercisable upon the occurrence of a Put Option Event (as defined in the SSSA). The price payable for MGE’s equity under the Put Option is calculated pursuant to a formula set forth in the SSSA, but will be not less than the aggregate of (i) the purchase price of MGE's equity paid by MGE (ZAR 550 million) plus the face value of any claims, (ii) 3.5% of such purchase price, and (iii) MGE's documented due diligence costs.

Investments in Early Stage Drug Development Companies

IsoBio. On July 28, 2025, we purchased 2,000,000 shares of IsoBio Series Seed-1 Preferred Stock at $2.50 per share for a total aggregate purchase price of $5.0 million. IsoBio is a U.S.-based radiotherapeutic development company focused on developing a broad pipeline of mAb-based radioisotope therapeutics targeting both derisked and novel tumor antigens for patients in need of new cancer therapies. As the owner of the Series Seed-1 Preferred Stock, we have the right to designate one board member. An officer and director of ours was designated to fill that board seat. In addition, another board member of ours is a board member and executive officer of IsoBio.

Opeongo. On January 26, 2026, we purchased 4,356,918 shares of Opeongo Series Seed-1 Preferred Stock at $2.2952 per share for a total aggregate purchase price of $10.0 million. Opeongo is a biotechnology company developing novel therapeutics using extracellular matrix modulation to target fibrosis, inflammation, and cancer. Opeongo was co-founded by David Baram, Ph.D. who serves as Opeongo’s Chief Executive Officer and director. As the owner of the Series Seed-1 Preferred Stock, we have the right to designate one board member. An officer and director of ours was designated to fill that board seat. In addition, another board member of ours is a board member and executive officer of Opeongo.

ENDRA. On May 27, 2026, we purchased 66,846 shares of ENDRA common stock, 511,541 prefunded warrants to purchase shares of common stock and 1,156,774 common warrants to purchase shares of common stock for a total aggregate purchase price of $3.8 million. ENDRA is the pioneer of Thermo Acoustic Enhanced UltraSound (TAEUS ® ), a technology being developed to assess tissue fat content and monitor tissue ablation during minimally invasive procedures, at the point of patient care.

Agreements with TerraPower LLC

On April 4, 2024, we entered into the TerraPower Agreement with TerraPower to develop a conceptual design, refined cost/schedule/financing, risk register, and term sheet for a HALEU facility. The TerraPower Agreement may be terminated for (a) breach or default, (b) our convenience or (c) TerraPower’s convenience. TerraPower is obligated to make all payments for milestones completed by us and these payments are nonrefundable.

On October 18, 2024, we signed the TerraPower Term Sheet that provides for the execution of two definitive agreements: (1) an agreement pursuant to which TerraPower will provide funding for our construction of a uranium enrichment facility capable of producing HALEU using our proprietary aerodynamic separation process technology to be located in the Republic of South Africa and (2) An agreement pursuant to which we will deliver to TerraPower the full capacity of the enrichment facility.

In May 2025, we entered into the TerraPower Loan Agreement, which provides conditional commitments from TerraPower to us through one of our wholly-owned U.S.-based subsidiaries for a multiple advance term loan totaling $22.0 million for the purpose of partially funding the construction of a proposed new uranium enrichment facility in South Africa. The total loan amount is inclusive of a 10% original issue discount on each disbursement and carries a fixed interest rate of 10% per annum. Per the terms of the TerraPower Loan Agreement and subject to the satisfaction of various conditions precedent to disbursements (including receiving all required licenses and permits to perform uranium enrichment in South Africa), we will receive aggregate loan disbursements of $20.0 million. Such loan matures on May 16, 2032. Interest will begin accruing upon each milestone disbursement we receive and will be added to the principal balance until November 2027. Principal and interest payments will be made in 60 equal installments beginning in November 2027.

41


 

In addition to the TerraPower Loan Agreement, in May 2025, we and TerraPower have entered into two supply agreements for the HALEU expected to be produced at our uranium enrichment facility. The initial core supply agreement is intended to support the supply of the required first fuel cores for the initial loading of TerraPower’s Natrium project in Wyoming. The long-term supply agreement is a 10-year supply agreement of up to a total of 150 metric tons of HALEU, commencing in 2028 through end of 2037.

Financings and Other Transactions

In June 2025, we issued 7,518,797 shares of common stock at $6.65 per share in a registered direct offering resulting in net proceeds of approximately $46.8 million after deducting underwriting discounts, commissions and offering expenses.

In July 2025, we issued 7,500,000 shares of common stock at $8.00 per share in a registered direct offering resulting in net proceeds of approximately $56.3 million after deducting underwriting discounts, commissions and offering expenses.

In October 2025, we issued 17,167,380 shares of common stock in a registered offering at the offering price of $12.25 per share, for net proceeds of approximately $199.3 million, after deducting underwriting discounts and commissions and estimated offering expenses.

On November 19, 2025, QLE received gross proceeds of $72.2 million through the issuance of convertible promissory notes with a stated interest rate of 8% (the “2025 Convertible Notes”), including $30.0 million in gross proceeds from ASP Isotopes, its parent. The maturity date of the 2025 Convertible Notes is November 19, 2030. The 2025 Convertible Notes automatically convert into common shares upon QLE’s closing of an IPO or other qualifying public transaction at 80% of the share price taking into consideration a valuation cap. In connection with the issuance of the 2025 Convertible Notes, QLE’s outstanding convertible promissory notes originally issued in March 2024 and June 2024 automatically converted into 2025 Convertible Notes with a value of $147.7 million.

On January 6, 2026, we issued 14,270,000 Consideration Shares in connection with the acquisition of Renergen.

On March 29, 2026, QLE, entered into an Exchange Agreement with a third party investor in which the parties agreed to exchange 1,995,000 Class B common shares owned by QLE for 1,995,000 Class A shares owned by the third party investor, on a one-for-one basis. This resulted in QLE's ownership in Skyline decreasing to under 10%.

On July 15, 2026, we and QLE entered into separate, individually negotiated private securities exchange agreements with certain holders of the 2025 Convertible Notes, pursuant to which such noteholders exchanged approximately $109.2 million in aggregate principal amount of the outstanding 2025 Convertible Notes, plus accrued and unpaid interest thereon, for an aggregate of 23,160,682 shares of our common stock (the “Exchange Transactions”). The Exchange Transactions closed on July 16, 2026. Upon the closing of the Exchange Transactions, the outstanding principal amount of 2025 Convertible Notes held by third party investors was reduced to approximately $80.6 million. ASP Isotopes holds approximately $139.2 million aggregate principal amount of 2025 Convertible Notes, which are eliminated in consolidation.

ENDRA Merger Agreement and Noble Private Placement

Merger Agreement. On June 25, 2026, we entered into an Agreement and Plan of Merger (the “Merger Agreement”), by and among ENDRA, Noble Africa LLC, a Delaware limited liability company and a direct, wholly-owned subsidiary of us (“Noble”), Renergen, ASP Isotopes, and Kruger Merger Sub LLC, a Delaware limited liability company and a direct, wholly-owned subsidiary of ENDRA (“Merger Sub”), pursuant to which Merger Sub will merge with and into Noble (the “Merger”), with Noble surviving the Merger as a direct wholly-owned subsidiary of ENDRA. Prior to the effective time of the Merger, we will contribute all of our equity interest in Renergen to Noble in exchange for 55,500,000 of Noble’s Class B Units. The shares of Class B common stock received by the Company upon conversion of the Class B Units in connection with the Merger will entitle the Company to 10 votes per share on all matters submitted to a vote of the stockholders of ENDRA. Following the Merger, ENDRA will be renamed “4K Resources, Inc.” and its Class A common stock is expected to be listed on Nasdaq.

Noble Private Placement. Concurrently with the entry into the Merger Agreement, Noble entered into subscription agreements with us and certain investors pursuant to which Noble agreed to sell approximately (i) 4,594,218 Class A Units of Noble and/or pre-funded warrants to purchase Class A Units of Noble to certain institutional investors and other persons and (ii) 3,054,185 Class B Units of Noble to us, at a price per unit of $6.57, for aggregate gross proceeds to Noble of approximately $50 million (the “Noble Investment”). The Noble Investment is expected to close immediately prior to the Merger.

Merger Agreement Amendment. On October 1, 2026, the Company, ENDRA, Noble, Renergen and Merger Sub entered into that certain First Amendment to the Merger Agreement (the “Amendment”) to, among other things, (i) amend ENDRA’s disclosure letter to permit ENDRA to amend the Pre-Funded Common Stock Purchase Warrant (the “Pre-Funded Warrant”) and Common Stock Purchase Warrant (the “Common Warrant” and, together with the Pre-Funded Warrant, the “Warrants”), each issued by ENDRA as of May 27, 2026 to LHE LNG Holdings LLC, a direct, wholly-owned subsidiary of the Company (the “ASPI ENDRA Purchaser”), as further described below, (ii) remove the requirement that the board of directors immediately following the closing of the Merger be classified into three separate classes, (iii) revise the minimum cash closing condition to reflect a minimum cash requirement of $3,800,002.59, less certain agreed-upon expenses to permit ENDRA to engage in certain investor relations activities, (iv) replace the form of ENDRA’s Fifth Amended and Restated Certificate of Incorporation with an updated form that removes the classified board provisions and other provisions that would have required a supermajority vote of ENDRA’s stockholders to be approved, (v) amend Noble Africa’s disclosure letter to permit Renergen to enter into a fifth addendum to that certain Term Loan Facility Agreement, dated as of May 19, 2025, by and between Renergen, ASPI and ASPI South Africa Proprietary Limited, a wholly-owned subsidiary of ASPI (the “ASPI Term Loan Facility”), which would increase Renergen’s borrowing capacity from ASPI from $80 million to up to $120 million and (vi) contemplate a sixth addendum to the ASPI Term Loan Facility to be entered into at or prior to the closing of the Merger, which would further increase Renergen’s borrowing capacity from ASPI from $120 million to up to $200 million. Except as expressly modified by the Amendment, the terms of the Merger Agreement were ratified and remain in full force and effect.

ENDRA Investment. On May 27, 2026, ENDRA entered into a securities purchase agreement (the “Securities Purchase Agreement”) with the ASPI ENDRA Purchaser pursuant to which ENDRA agreed to sell and issue to the ASPI ENDRA Purchaser in a private placement offering an aggregate of 66,846 shares of ENDRA common stock, par value $0.0001 per share (the “ENDRA Common Stock”), Pre-Funded Warrants to purchase an aggregate of up to 511,541 shares of ENDRA Common Stock (the “Pre-Funded Warrant Shares”) at a per share exercise price of $0.0001 and Common Warrants to purchase an aggregate of up to 1,156,774 shares of ENDRA Common Stock (the “Common Warrant Shares” and together with the Pre-Funded Warrant Shares, the “Warrant Shares”)) at a per share exercise price of $6.57. On October 1, 2026, ENDRA and the ASPI ENDRA Purchaser entered into (i) Amendment No. 1 to Common

42


 

Stock Purchase Warrant (the “Common Warrant Amendment”) and (ii) Amendment No. 1 to Pre-Funded Common Stock Purchase Warrant (the “Pre-Funded Warrant Amendment” and, together with the Common Warrant Amendment, the “Warrant Amendments”). The Warrant Amendments make changes to each Warrant to, among other things, remove the 4.99% beneficial ownership limitation on the ASPI ENDRA Purchaser’s ability to exercise each Warrant. Except as amended by the Warrant Amendments, the terms of each Warrant remain unaltered and in full force and effect. As previously disclosed, a portion of the Pre-Funded Warrants in respect of 324,372 Pre-Funded Warrant Shares and all of the Common Warrants will only become exercisable upon ENDRA obtaining stockholder approval of the issuance of such Pre-Funded Warrant Shares and Common Warrant Shares.

Closing of the Merger. In connection with the Merger, ENDRA filed a Registration Statement on Form S-4 (File No. 333-299256) (the "Registration Statement") with the SEC on October 2, 2026. We refer you to the disclosures in the proxy statement/prospectus (which is preliminary and subject to completion) that is included in the Registration Statement for additional information relating to the Merger and ENDRA. Consummation of the Merger is subject to certain closing conditions, including the approval by ENDRA’s stockholders, the effectiveness of the Registration Statement, the approval for listing of the Class A Common Stock on Nasdaq, ENDRA having an amount of cash equal to or greater than $3.8 million, the receipt by Noble of the proceeds of the Noble Investment, we having contributed our equity interests in Renergen to Noble, and Noble’s receipt of a written consent of the U.S. International Development Finance Corporation as required under the finance agreement with Tetra4. The Merger Agreement may be terminated by either party if the Merger has not been completed by December 24, 2026. The Merger is anticipated to close in the fourth quarter of 2026 or, subject to the parties’ agreement to extend the outside date for consummating the Merger, the first quarter of 2027.

 

Other Contractual Obligations

We enter into contracts in the normal course of business for testing, manufacturing and other services and products for operating purposes. These contracts do not contain any minimum purchase commitments and are cancelable by us upon prior notice. For additional details regarding our contractual obligations, see Note 11 "Commitments and Contingencies" and Note 12 “Leases” to our condensed consolidated financial statements appearing elsewhere in this Quarterly Report on Form 10-Q.

Components of Results of Operations

Revenue

We recognize product revenue from the sale of nuclear medical doses for PET scanning. Beginning in the fourth quarter of 2025, we started recognizing product revenue from the sale of nuclear medical doses for SPECT scanning. Effective with the acquisition of 100% of Renergen in the first quarter of 2026, we started recognizing product revenue from the sale of LNG. We also recognize collaboration revenue from our TerraPower R&D Agreement.

Cost of Revenue

Cost of revenue associated with the sale of nuclear medical doses for PET and SPECT scanning and the sale of LNG consist of labor, processing costs, delivery and materials. There is no cost of revenue associated with our collaboration revenue.

Operating Expenses

Our operating expenses consist of (i) research and development expenses and (ii) selling, general and administrative expenses.

Research and Development

Our research and development expenses consist primarily of direct and indirect costs incurred in connection with the development activities for our future isotopes.

Direct costs include:

•
external research and development expenses; and
•
costs related to designing the development processes of isotope production.

Indirect costs include:

•
personnel-related costs, which include salaries, payroll taxes, employee benefits, and other employee-related costs, including stock-based compensation expense, for personnel engaged in research and development functions; and
•
facilities and other various expenses.

Research and development expenses are recognized as incurred and payments made prior to the receipt of goods or services to be used in research and development are capitalized until the goods or services are received.

We expect that our research and development expenses will increase substantially for the foreseeable future as we continue the development of our future isotopes. We cannot determine with certainty the timing of initiation, the duration or the completion costs of development activities. Actual development timelines, the probability of success and development costs can differ materially from expectations.

We will need to raise substantial additional capital in the future. In addition, we cannot forecast which future isotopes may be subject to future collaborations, when such arrangements will be secured, if at all, and to what degree such arrangements would affect our development plans and capital requirements.

Our research and development expenses may vary significantly based on a variety of factors, such as:

•
the scope, rate of progress, expense and results of our development activities;
•
the phase of development of our future isotopes;
•
the timing, receipt, and terms of any approvals from applicable regulatory authorities including the FDA and foreign regulatory authorities;
•
significant and changing government regulation and regulatory guidance;

43


 

•
the cost and timing of designing the development processes of isotope production;
•
the extent to which we establish additional strategic collaborations or other arrangements; and
•
the impact of any business interruptions to our operations or to those of the third parties with whom we work.

A change in the outcome of any of these variables with respect to the development of any of our future isotopes could significantly change the costs and timing associated with the development of that future isotope.

Selling, General and Administrative

Selling, general and administrative expenses consist primarily of personnel-related costs, which include salaries, payroll taxes, employee benefits, and other employee-related costs, including stock-based compensation expense, for personnel in executive, sales, finance and other administrative functions. Other significant costs include legal fees relating to corporate matters, professional fees for accounting and consulting services and facility-related costs.

We expect that our ongoing selling, general and administrative expenses will increase substantially for the foreseeable future to support our increased research and development activities and increased costs of operating as a public company and in building our internal resources. These increased costs will include increased expenses related to audit, legal, regulatory and tax-related services associated with maintaining compliance with exchange listing and SEC requirements, director and officer insurance premiums and investor and public relations costs associated with operating as a public company.

Segment Information

Beginning in 2024, primarily as a result of increased business activities of our subsidiary, QLE, we had two operating segments: (i) nuclear fuels, and (ii) specialist isotopes and related services. Beginning in August 2025, primarily as a result of the acquisition of Skyline, we had three operating segments: (i) nuclear fuels, (ii) specialist isotopes and related services, and (iii) construction services. Beginning in the first quarter of 2026, primarily as a result of the acquisition of Renergen and the deconsolidation of Skyline, we have three operating segments: (i) nuclear fuels, (ii) specialist isotopes and related services, and (iii) Helium and LNG. Our prior “construction services” segment is shown below as “discontinued operations” due to the deconsolidation of Skyline.

The specialist isotopes and related services segment is focused on research and development of technologies and methods used to separate high-value, low-volume isotopes (such as C-14, Si-28 and Yb-176) for highly specialized target end markets other than advanced nuclear fuels, including pharmaceuticals and agrochemicals, nuclear medical imaging and semiconductors, as well as services related to these isotopes, and this segment includes operations of PET Labs, Numed, and ECNP.

The nuclear fuels segment is focused on research and development of technologies and methods used to produce HALEU and Lithium-6 for the advanced nuclear fuels target end market, and this segment includes operations of QLE.

The Helium and LNG segment is focused on the exploration, production and sale of LNG in South Africa, and this segment includes operations of Renergen.

The financial information is regularly reviewed by the chief operating decision maker (“CODM”) in deciding how to allocate resources. Our CODM is our chief executive officer. The CODM regularly reviews any asset information by operating segment and, accordingly, asset information is reported on a segment basis.

The following table shows total assets by segment and a reconciliation to the condensed consolidated financial statements as of September 30, 2026 and December 31, 2025 (in thousands):

 

 

 

September 30,
2026

 

 

December 31,
2025

 

Segment assets:

 

 

 

 

 

 

Specialist isotopes and related services

 

$

210,920

 

 

$

321,190

 

Nuclear fuels

 

 

96,707

 

 

 

94,252

 

Helium and LNG

 

 

230,502

 

 

 

—

 

Discontinued operations

 

 

—

 

 

 

82,578

 

Total assets

 

$

538,129

 

 

$

498,020

 

Select information from the condensed consolidated statements of operations and comprehensive loss as of the three months ended September 30, 2026 and 2025 is as follows:

 

Revenues

 

 

Segment Operating Loss

 

 

 

Three Months Ended September 30,

 

 

Three Months Ended September 30,

 

Segment

 

2026

 

 

2025

 

 

2026

 

 

2025

 

Specialist isotopes and related services

 

$

4,257

 

 

$

1,271

 

 

$

(18,630

)

 

$

(11,763

)

Nuclear fuels

 

 

—

 

 

 

—

 

 

 

(11,466

)

 

 

(3,224

)

Helium and LNG

 

 

867

 

 

 

—

 

 

 

(10,419

)

 

 

—

 

 

$

5,124

 

 

$

1,271

 

 

$

(40,515

)

 

$

(14,987

)

Select information from the condensed consolidated statements of operations and comprehensive loss as of the nine months ended September 30, 2026 and 2025 is as follows:

 

Revenues

 

 

Segment Operating Loss

 

 

 

Nine Months Ended September 30,

 

 

Nine Months Ended September 30,

 

Segment

 

2026

 

 

2025

 

 

2026

 

 

2025

 

Specialist isotopes and related services

 

$

11,512

 

 

$

3,571

 

 

$

(50,094

)

 

$

(27,218

)

Nuclear fuels

 

 

800

 

 

 

—

 

 

 

(29,288

)

 

 

(7,690

)

Helium and LNG

 

 

2,115

 

 

 

—

 

 

 

(20,216

)

 

 

—

 

 

$

14,427

 

 

$

3,571

 

 

$

(99,598

)

 

$

(34,908

)

 

44


 

Results of Operations

Comparison of the Three Months Ended September 30, 2026 and 2025

The following table summarizes our results of operations for the three months ended September 30, 2026 and 2025:

 

Three Months Ended September 30,

 

 

 

 

 

 

2026

 

 

2025

 

 

Change

 

Product revenue

 

$

5,124

 

 

$

1,271

 

 

$

3,853

 

Total revenue

 

 

5,124

 

 

 

1,271

 

 

 

3,853

 

Cost of revenue

 

 

4,331

 

 

 

1,029

 

 

 

3,302

 

Gross profit

 

 

793

 

 

 

242

 

 

 

551

 

Operating expenses:

 

 

 

 

 

 

 

 

 

Research and development

 

 

7,236

 

 

 

3,098

 

 

 

4,138

 

Selling, general and administrative

 

 

34,072

 

 

 

12,131

 

 

 

21,941

 

Total operating expenses

 

 

41,308

 

 

 

15,229

 

 

 

26,079

 

Other (expense) income:

 

 

 

 

 

 

 

 

 

Foreign exchange transaction loss

 

 

(511

)

 

 

(15

)

 

 

(496

)

Change in fair value of share liability

 

 

—

 

 

 

(71

)

 

 

71

 

Change in fair value of convertible notes payable

 

 

164

 

 

 

173

 

 

 

(9

)

Change in fair value of investments

 

 

(988

)

 

 

—

 

 

 

(988

)

Gain on extinguishment of convertible notes

 

 

11,250

 

 

 

—

 

 

 

11,250

 

Interest income

 

 

4,333

 

 

 

1,844

 

 

 

2,489

 

Interest expense

 

 

(3,481

)

 

 

(76

)

 

 

(3,405

)

Total other income

 

 

10,767

 

 

 

1,855

 

 

 

8,912

 

Loss before income tax expense

 

$

(29,748

)

 

$

(13,132

)

 

$

(16,616

)

Revenue, Cost of Revenue and Gross Profit

Product revenue. Product revenue for the three months ended September 30, 2026 increased by $3.9 million to $5.1 million compared to $1.3 million for the three months ended September 30, 2025. We have recognized revenue of our radiopharmacies from the sale of nuclear medical doses for PET and SPECT scanning of $4.3 million and $1.3 million for the three months ended September 30, 2026 and 2025, respectively. The increase of $3.0 million was primarily attributable to (1) revenue of $0.8 million related to the acquisition of NuMed in January 2026, (2) revenue of $0.9 million related to the acquisition of ECNP in October 2025, and (3) an increase of $1.3 million related to the increase in sales of our nuclear medicine pipeline through PET Labs. With the acquisition of Renergen in January 2026, we recognized revenue from the sale of LNG of $0.9 million for the three months ended September 30, 2026.

Collaboration revenue. We did not recognize any collaboration revenue from the TerraPower R&D Agreement for the three months ended September 30, 2026 and 2025.

Cost of revenue. We have recognized the related cost of revenue of our radiopharmacies and Renergen for the same periods. The cost of revenue was $4.3 million and $1.0 million for the three months ended September 30, 2026 and 2025, respectively. The increase in cost of revenue of $3.3 million was primarily attributable to (1) the acquisitions of ECNP of $0.8 million, (2) the acquisitions of Numed of $0.5 million, (3) the acquisition of Renergen of $1.7 million and (4) an increase of $0.3 million related to the increase in sales of our nuclear medicine pipeline through PET Labs.

Gross profit. Gross profit for the three months ended September 30, 2026 increased by $0.6 million to $0.8 million compared to $0.2 million for the three months ended September 30, 2025. The gross profit from our radiopharmacies increased from $0.2 million to $1.6 million while gross margin increased from 19% to 38% over this period primarily attributable to the acquisitions of Numed and ECNP as well as higher sales volumes at PET Labs spreading fixed operating costs over a larger revenue base. These increases were partially offset by a Helium and LNG segment loss of $0.8 million related to the acquisition of Renergen in January 2026 which resulted in a negative gross margin of 96% for that segment. The negative gross margin was primarily attributable to fixed operating costs associated with operating and maintaining the production facility while production volumes remained below levels necessary to absorb such costs. Management expects margins in the Helium and LNG segment to improve in 2027 as production volumes increase and fixed operating costs are absorbed over a larger production base.

Research and Development Expenses

The following table summarizes our research and development expenses for the three months ended September 30, 2026 and 2025:

 

Three Months Ended September 30,

 

 

 

 

 

 

2026

 

 

2025

 

 

Change

 

Personnel-related costs

 

$

2,138

 

 

$

1,114

 

 

$

1,024

 

Manufacturing engineering

 

 

793

 

 

 

1,121

 

 

 

(328

)

Contract services, consulting and professional

 

 

2,372

 

 

 

42

 

 

 

2,330

 

Facility and depreciation expenses

 

 

1,458

 

 

 

793

 

 

 

665

 

Exploratory costs

 

 

408

 

 

 

—

 

 

 

408

 

Other expenses

 

 

67

 

 

 

28

 

 

 

39

 

Total research and development expenses

 

$

7,236

 

 

$

3,098

 

 

$

4,138

 

45


 

Research and development expenses were $7.2 million for the three months ended September 30, 2026, compared to $3.1 million for the three months ended September 30, 2025. The overall increase of $4.1 million was primarily attributable to the following:

•
an increase in personnel-related costs of $1.0 million primarily attributable to an increase in headcount and salaries;
•
a decrease in manufacturing engineering expenses of $0.3 million primarily attributable to timing of pre-commercial operations;
•
an increase in contract services, consulting and professional expenses of $2.3 million in order to optimize commercial production;
•
an increase in facility and depreciation expenses of $0.7 million primarily attributable to an increase in space dedicated to development, noncapitalized expenses and repairs and maintenance; and
•
an increase in exploratory costs at Renergen of $0.4 million.

Selling, General and Administrative Expenses

Selling, general and administrative expenses were $34.1 million for the three months ended September 30, 2026, compared to $12.1 million for the three months ended September 30, 2025. The overall increase of $21.9 million was primarily attributable to the following:

•
an increase in personnel-related costs of $10.8 million primarily attributable to an increase in headcount, salaries and stock-based compensation and the acquisition of Renergen in January 2026 and ECNP in October 2025;
•
an increase in consulting and professional fees of $5.5 million primarily attributable to corporate development activity and the acquisition of Renergen and Numed in January 2026 and ECNP in October 2025;
•
an increase in facility and depreciation expenses of $2.7 million primarily attributable to an increase in space dedicated to development, noncapitalized expenses and repairs and maintenance and the acquisition of Renergen in January 2026;
•
an increase in insurance premiums of $0.8 million primarily attributable to overall increased coverage and the acquisition of Renergen and Numed in January 2026 and ECNP in October 2025;
•
an increase in employee travel and related expenses of $0.7 million primarily attributable to increased corporate activity; and
•
an increase in other general and administrative expenses of $1.6 million, which includes expense from the acquisition of Renergen and Numed in January 2026 and ECNP in October 2025.

Other Income (Expense)

Other income for the three months ended September 30, 2026 was $10.8 million, which includes interest income of $4.3 million, a gain on extinguishment of convertible notes payable of $11.3 million and $0.2 million from the change in fair value of the convertible notes payable, partially offset by a foreign exchange transaction loss of $0.5 million, an expense of $1.0 million due to change in fair value of our investments and interest expense of $3.5 million.

Other income for the three months ended September 30, 2025 was $1.9 million, which includes a $0.2 million gain from the change in fair value of the convertible notes payable and interest income of $1.8 million, partially offset by interest expense of $0.1 million.

Comparison of the Nine Months Ended September 30, 2026 and 2025

The following table summarizes our results of operations for the nine months ended September 30, 2026 and 2025:

 

Nine Months Ended September 30,

 

 

 

 

 

 

2026

 

 

2025

 

 

Change

 

Product revenue

 

$

13,627

 

 

$

3,571

 

 

$

10,056

 

Collaboration revenue

 

 

800

 

 

 

—

 

 

 

800

 

Total revenue

 

 

14,427

 

 

 

3,571

 

 

 

10,856

 

Cost of revenue

 

 

10,487

 

 

 

2,430

 

 

 

8,057

 

Gross profit

 

 

3,940

 

 

 

1,141

 

 

 

2,799

 

Operating expenses:

 

 

 

 

 

 

 

 

 

Research and development

 

 

19,324

 

 

 

5,508

 

 

 

13,816

 

Selling, general and administrative

 

 

84,214

 

 

 

30,541

 

 

 

53,673

 

Total operating expenses

 

 

103,538

 

 

 

36,049

 

 

 

67,489

 

Other (expense) income:

 

 

 

 

 

 

 

 

 

Foreign exchange transaction loss

 

 

(1,610

)

 

 

(113

)

 

 

(1,497

)

Change in fair value of share liability

 

 

—

 

 

 

(200

)

 

 

200

 

Change in fair value of convertible notes payable

 

 

(3,863

)

 

 

(64,542

)

 

 

60,679

 

Change in fair value of investments

 

 

138

 

 

 

—

 

 

 

138

 

Gain on extinguishment of convertible notes

 

 

11,250

 

 

 

—

 

 

 

11,250

 

Interest income

 

 

10,091

 

 

 

3,283

 

 

 

6,808

 

Interest expense

 

 

(6,984

)

 

 

(245

)

 

 

(6,739

)

Total other income (expense)

 

 

9,022

 

 

 

(61,817

)

 

 

70,839

 

Loss before income tax expense

 

$

(90,576

)

 

$

(96,725

)

 

$

6,149

 

Revenue, Cost of Revenue and Gross Profit

Product revenue. Product revenue for the nine months ended September 30, 2026 increased by $10.1 million to $13.6 million compared to $3.6 million for the nine months ended September 30, 2025. We have recognized revenue of our radiopharmacies from the sale of nuclear medical doses for PET and SPECT scanning of $11.5 million and $3.6 million for the nine months ended September 30, 2026 and 2025, respectively. The increase of $7.9 million was primarily attributable to (1) revenue of $2.2 million related to the acquisition of NuMed in January 2026, (2) revenue of $2.9 million related to the acquisition of ECNP in October 2025, and (3)

46


 

an increase of $2.8 million related to the increase in sales of our nuclear medicine pipeline through PET Labs. With the acquisition of Renergen in January 2026, we recognized revenue from the sale of LNG of $2.1 million for the nine months ended September 30, 2026.

Collaboration revenue. We recognized $0.8 million in collaboration revenue from the TerraPower R&D Agreement for the nine months ended September 30, 2026. No collaboration revenue was recognized for the nine months ended September 30, 2025.

Cost of revenue. We have recognized the related cost of revenue of our radiopharmacies and Renergen for the same periods. The cost of revenue was $10.5 million and $2.4 million for the nine months ended September 30, 2026 and 2025, respectively. The increase in cost of revenue of $8.1 million was primarily attributable to (1) cost of revenue of $1.7 million related to the acquisitions of ECNP in October 2025, (2) cost of revenue of $1.6 million related to the acquisitions of Numed in January 2026, (3) cost of revenue of $4.0 million related to the acquisition of Renergen in January 2026 and (4) an increase of $0.8 million related to the increase in sales of our nuclear medicine pipeline through PET Labs.

Gross profit. Gross profit for the nine months ended September 30, 2026 increased by $2.8 million to $3.9 million compared to $1.1 million for the nine months ended September 30, 2025. The gross profit from our radiopharmacies increased from $1.1 million to $5.0 million while gross margin increased from 32% to 44% over this period primarily attributable to the acquisitions of Numed and ECNP as well as higher sales volumes at PET Labs spreading fixed operating costs over a larger revenue base. We also received $0.8 million from our collaboration with TerraPower. These increases were partially offset by a Helium and LNG segment loss of $1.9 million related to the acquisition of Renergen in January 2026 which resulted in a negative gross margin of 90% for that segment. The negative gross margin was primarily attributable to fixed operating costs associated with operating and maintaining the production facility while production volumes remained below levels necessary to absorb such costs. Management expects margins in the Helium and LNG segment to improve in 2027 as production volumes increase and fixed operating costs are absorbed over a larger production base.

Research and Development Expenses

The following table summarizes our research and development expenses for the nine months ended September 30, 2026 and 2025:

 

Nine Months Ended September 30,

 

 

 

 

 

 

2026

 

 

2025

 

 

Change

 

Personnel-related costs

 

$

7,065

 

 

$

1,781

 

 

$

5,284

 

Manufacturing engineering

 

 

1,440

 

 

 

1,246

 

 

 

194

 

Contract services, consulting and professional

 

 

4,873

 

 

 

152

 

 

 

4,721

 

Facility and depreciation expenses

 

 

4,226

 

 

 

2,030

 

 

 

2,196

 

Exploratory costs

 

 

1,318

 

 

 

—

 

 

 

1,318

 

Other expenses

 

 

402

 

 

 

299

 

 

 

103

 

Total research and development expenses

 

$

19,324

 

 

$

5,508

 

 

$

13,816

 

Research and development expenses were $19.3 million for the nine months ended September 30, 2026, compared to $5.5 million for the nine months ended September 30, 2025. The overall increase of $13.8 million was primarily attributable to the following:

•
an increase in personnel-related costs of $5.3 million primarily attributable to an increase in headcount and salaries;
•
an increase in manufacturing engineering expenses of $0.2 million primarily attributable to pre-commercial operations;
•
an increase in contract services and consulting expenses of $4.7 million in order to optimize commercial production;
•
an increase in facility and depreciation expenses of $2.2 million primarily attributable to an increase in space dedicated to development, noncapitalized expenses and repairs and maintenance; and
•
an increase in exploratory costs at Renergen of $1.3 million.

Selling, General and Administrative Expenses

Selling, general and administrative expenses were $84.2 million for the nine months ended September 30, 2026, compared to $30.5 million for the nine months ended September 30, 2025. The overall increase of $53.7 million was primarily attributable to the following:

•
an increase in personnel-related costs of $21.9 million primarily attributable to an increase in headcount, salaries and stock-based compensation and the acquisition of Renergen in January 2026 and ECNP in October 2025;
•
an increase in consulting and professional fees of $15.0 million primarily attributable to corporate development activity and the acquisition of Renergen in January 2026 and ECNP in October 2025;
•
an increase in facility and depreciation expenses of $8.1 million primarily attributable to an increase in space dedicated to development, noncapitalized expenses and repairs and maintenance and the acquisition of Renergen in January 2026;
•
an increase in insurance premiums of $2.3 million primarily attributable to overall increased coverage and the acquisition of Renergen and Numed in January 2026 and ECNP in October 2025;
•
an increase in employee travel and related expenses of $1.8 million primarily attributable to increased corporate activity; and
•
an increase in other general and administrative expenses of $4.7 million, which includes expense from the acquisition of Renergen and Numed in January 2026 and ECNP in October 2025.

Other Income (Expense)

Other income for the nine months ended September 30, 2026 was $9.0 million, which includes a $11.3 million gain on extinguishment of convertible notes payable, interest income of $10.1 million and a gain from a change in the fair value of our investments of $0.1 million, partially offset by an expense of $3.9 million from the change in fair value of the convertible notes payable, interest expense of $7.0 million and a foreign exchange transaction loss of $1.6 million.

Other expense for the nine months ended September 30, 2025 was $61.8 million, which includes an expense of $64.5 million from the change in fair value of the convertible notes payable, an expense of $0.2 million from the change in fair value of share liability

47


 

related to the shares issuable to consultants, interest expense of $0.2 million and a foreign exchange transaction loss of $0.1 million, partially offset by interest income of $3.3 million.

Non-GAAP Financial Information

We use certain measures to assess the financial performance of our business, as well as to comply with the reporting requirements of the JSE. Certain of these measures are termed “non-GAAP measures” because they exclude amounts that are included in, or include amounts that are excluded from, the most directly comparable measure calculated and presented in accordance with GAAP, or are calculated using financial measures that are not calculated in accordance with GAAP. These non-GAAP measures include headline loss, and headline loss per common share.

An explanation of the relevance of the non-GAAP measure, a reconciliation of the non-GAAP measure to the most directly comparable measure calculated and presented in accordance with GAAP and a discussion of its limitations are set out below. We do not regard these non-GAAP measures as a substitute for, or superior to, the equivalent measure calculated and presented in accordance with GAAP or that calculated using financial measures that are calculated in accordance with GAAP and such measures may not be comparable to similarly titled measures used by other companies.

Headline Loss per Share

In connection with our secondary listing on the JSE, we are required to calculate and publicly disclose headline loss per share and diluted headline loss per share. Headline loss per share is calculated using net loss which has been determined in accordance with GAAP. Headline loss for the period represents the loss for the period attributable to our common stockholders adjusted for the remeasurements that are more closely aligned to the operating or trading results as set forth below, and headline loss per share represents headline loss divided by the weighted average number of shares of common stock outstanding.

The table below presents a reconciliation between net loss attributable to common stockholders to headline loss.

 

 

Three Months Ended
September 30,

 

 

Nine Months Ended
September 30,

 

 

2026

 

 

2025

 

 

2026

 

 

2025

 

Net loss attributable to ASP Isotopes Inc. shareholders

 

$

(30,371

)

 

$

(12,617

)

 

$

(70,833

)

 

$

(96,125

)

Adjusted for:

 

 

 

 

 

 

 

 

 

 

 

 

Gain on extinguishment of convertible notes

 

 

(11,250

)

 

 

—

 

 

 

(11,250

)

 

 

—

 

Change in fair value of share liability

 

 

—

 

 

 

71

 

 

 

—

 

 

 

200

 

Change in fair value of convertible notes payable

 

 

(164

)

 

 

(173

)

 

 

3,863

 

 

 

64,542

 

Change in fair value of equity investments

 

 

988

 

 

 

—

 

 

 

(138

)

 

 

—

 

Headline loss

 

$

(40,797

)

 

$

(12,719

)

 

$

(78,358

)

 

$

(31,383

)

Weighted average common shares outstanding on which the net loss attributable to ASP Isotopes Inc. shareholders per share and headline loss per share has been calculated - basic and diluted

 

 

143,385,783

 

 

 

88,552,309

 

 

 

128,891,373

 

 

 

75,985,507

 

Net loss per share, attributable to ASP Isotopes Inc. shareholders, basic and diluted

 

$

(0.21

)

 

$

(0.14

)

 

$

(0.55

)

 

$

(1.27

)

Headline loss per share, attributable to ASP Isotopes Inc. shareholders, basic and diluted

 

$

(0.28

)

 

$

(0.14

)

 

$

(0.61

)

 

$

(0.41

)

The above disclosure was prepared for the purpose of complying with the reporting requirements of the JSE and includes certain non-GAAP measures, such as headline loss and headline loss per common share, and related reconciliations.

Liquidity and Capital Resources

Sources of Liquidity

We have incurred net losses and negative cash flows from operations since our inception, and we expect to continue to incur significant and increasing net losses for the foreseeable future. We have principally financed our operations to date through the issuance of our common stock, including our IPO, and the issuance of convertible notes payable.

As of September 30, 2026, we had cash and cash equivalents of $201.7 million. We have not generated any revenue from the sale of our enriched isotopes, and our ability to generate product revenue from the sale of enriched isotopes sufficient to achieve profitability will depend on the successful development and eventual commercialization of one or more of our current or future enriched isotopes.

We recognize product revenue from the sale of nuclear medical doses for PET and SPECT scanning in South Africa and the U.S. Our ability to generate product revenue from the sale of nuclear medical doses for PET and SPECT scanning sufficient to achieve profitability will depend on the successful expansion of production capabilities and commercialization of the results of that expansion. Effective with the acquisition of Renergen in January 2026, we also recognize revenue from the sale of helium and LNG. Our ability to generate revenue from the sale of helium and LNG sufficient to achieve profitability will depend on the successful expansion of production capabilities and commercialization of the results of that expansion. Renergen’s outstanding debt funding may also materially affect our liquidity. We also recognize collaboration revenue from our TerraPower R&D Agreement.

Future Funding Requirements

Based on our current operating plan, we estimate that our existing cash and cash equivalents, proceeds from short-term investments, as well as cash flow from operations, will be sufficient to fund our operating expenses and capital expenditure requirements through at least the next 12 months from the date the financial statements are issued and beyond. However, our forecast of the period of time through which our financial resources will be adequate to support our operations is a forward-looking statement that involves risks and uncertainties, and actual results could vary materially. We have based this estimate on assumptions that may prove to be wrong, and we could deplete our capital resources sooner than we expect. Additionally, the process of developing isotopes is costly, and the timing of progress and expenses in these development activities is uncertain.

48


 

Our future capital requirements will depend on many factors, including:

•
the type, number, scope, progress, expansions, results, costs and timing of, our development activities for our future isotopes, helium and LNG;
•
the outcome, timing and costs of regulatory review of our future isotopes or for helium or LNG we produce during Phase 2 of the Virginia Gas Project;
•
our ability to negotiate and enter into binding definitive agreements with DFC or SBSA for senior debt funding for Phase 2 of the Virginia Gas Project;
•
our ability to restructure our outstanding debt and the adequacy of our available funds to pay our outstanding debt obligations as they come due;
•
the costs and timing of manufacturing for our future isotopes and of exploring for, developing or producing natural gas and helium;
•
our efforts to enhance operational systems and hire additional personnel to satisfy our obligations as a public company, including enhanced internal controls over financial reporting;
•
the costs associated with hiring additional personnel and consultants as our preclinical and clinical activities increase;
•
the costs and timing of establishing or securing sales and marketing and distribution capabilities, whether alone or with third parties, to commercialize future isotopes or with respect to LNG and helium we produce at the Virginia Gas Plant for which we may obtain regulatory approval, if any;
•
the timing of construction of Phase 2, which based on our latest cost estimate is expected to be in excess of $1.0 billion (including borrowing costs and general corporate costs during construction);
•
the price at which we sell our LNG and liquid helium;
•
unforeseen plant disruptions, operational issues and the cost and availability of raw materials, including current supply chain issues, related to the Virginia Gas Project;
•
our ability to achieve sufficient market acceptance, coverage and adequate reimbursement from third-party payors and adequate market share and revenue for any approved products;
•
the terms and timing of establishing and maintaining collaborations, licenses and other similar arrangements;
•
the costs of obtaining, expanding, maintaining and enforcing our patent and other intellectual property rights;
•
the costs to list QLE as a separate public company and costs associated with the ENDRA Merger; and
•
costs associated with any products or technologies that we may in-license or acquire.

Developing and commercializing isotopes is a time-consuming, expensive and uncertain process that takes years to complete, and we may never achieve the necessary results required or obtain applicable regulatory approval for any isotopes or generate revenue from the sale of any future isotopes (assuming applicable regulatory approval is received). In addition, our future isotopes (assuming applicable regulatory approval is received) may not achieve commercial success. Our commercial revenues, if any, will be derived from sales of isotopes that we do not expect to be commercially available until the fourth quarter of 2026. If we receive permits and licenses to enrich U-235 (which in itself is highly uncertain), we do not expect U-235 to be commercially available for at least several years, if ever. As a result, we may need substantial additional financing to support our continuing operations and further the development of and commercialization of our future isotopes.

Expansion of the production and distribution of nuclear medical doses for PET scanning is a time-consuming, expensive and uncertain process that may take years to complete. As a result, we may need substantial additional financing to support our continuing operations and further the development of and commercialization of future nuclear medical doses for PET scanning.

Large amounts of capital are required to support the growth in our business and operations in South Africa, including to maintain and progress toward full commercial operation of Phase 1 of the Virginia Gas Project, and for the construction and development of Phase 2 of our Virginia Gas Project, and long-term production and processing requires both significant capital expenditure and ongoing maintenance expenditure. Our revenues related to the sale of helium and LNG may vary significantly from period to period as a result of changes in volumes of production sold and commodity prices. Natural gas prices have historically been volatile. Lower commodity prices may not only decrease our revenues, but also potentially the amount of natural gas that we can produce economically. We plan to add reserves through drilling. Our ability to add reserves through drilling projects is dependent on many factors, including our ability to borrow or raise capital and procure materials, services and personnel. Phase 2 of the Virginia Gas Project requires a significant amount of capital and is currently estimated to cost in excess of $1.0 billion (including borrowing costs and general corporate costs during construction) based on our latest cost estimate, which could change based on inaccurate assumptions and changing economic and operating conditions. We intend to continue to pursue senior debt funding for Phase 2 of the Virginia Gas Project from institutional lenders, including the U.S. International Development Finance Corporation ("DFC") and Standard Bank of South Africa ("SBSA"). Renergen received a letter of conditional approval from the DFC, pursuant to the DFC’s application review process, for up to $500 million in senior secured debt financing (the “Commitment Letter”). On September 30, 2026, the DFC agreed to extend its commitment to permit the finalization of the finance agreement under the Commitment Letter to July 1, 2029. The financing under the Commitment Letter is expected to be conditional upon, among other things, certain equity investments; the right to use a portion of the real property on which the Phase 2 facilities and wells are located, whether through ownership, leases, easements, rights-of-way or similar arrangements; Tetra4's entry into business, construction and operational arrangements satisfactory to the lenders for the delivery of the Phase 2 facilities; established marketing plans for helium and LNG sales, including timing, volumes and pricing to comply with the financial covenants under the proposed debt facilities; entry into definitive helium and LNG offtake agreements providing contracted revenues sufficient to cover a percentage of the projected debt service under the proposed debt facilities; certain debt-to-equity ratios; and the receipt of certain regulatory approvals. The Commitment Letter is non-binding and subject to a number of terms and conditions, contingencies and uncertainties. There can be no assurance that we will ultimately enter into a binding definitive agreement with the DFC or that the terms of such agreement will not differ, possibly materially, from those described herein.

In addition, SBSA has previously indicated its willingness to consider supporting Phase 2 of the Virginia Gas Project for up to $250 million of senior debt funding. No binding definitive agreements have been executed with respect to either facility. There can be no assurance we will be able to obtain financing from the DFC or the SBSA for Phase 2 of the Virginia Gas Project on terms that are

49


 

favorable to us or at all. As a result, we may need substantial additional or alternative financing to support our continuing operations, ramp up production of Phase 1, and further the development of Phase 2 and commercialization of the Virginia Gas Project.

Until such time as we can generate significant revenue from sales of our future isotopes, nuclear medical doses for PET and SPECT scanning and sales of helium and LNG, if ever, we expect to finance our cash needs through public or private equity or debt financings or other capital sources, including potential collaborations, licenses and other similar arrangements. However, we may be unable to raise additional funds or enter into such other arrangements when needed on favorable terms or at all. Our ability to raise additional funds may be adversely impacted by potential worsening global economic conditions and the recent disruptions to, and volatility in, the credit and financial markets in the United States and worldwide resulting severely diminished liquidity and credit availability, increased interest rates, inflationary pressures, declines in consumer confidence, declines in economic growth, increases in unemployment rates and uncertainty about economic stability. The financial markets and the global economy may also be adversely affected by the current or anticipated impact of military conflict. To the extent that we raise additional capital through the sale of equity or convertible debt securities, the ownership interest of our stockholders will be or could be diluted, and the terms of these securities may include liquidation or other preferences that adversely affect the rights of our common stockholders. Debt financing and equity financing, if available, may involve agreements that include covenants limiting or restricting our ability to take specific actions, such as incurring additional debt, making capital expenditures or declaring dividends. If we raise funds through collaborations, or other similar arrangements with third parties, we may have to relinquish valuable rights to our future isotopes, future helium and LNG production and sales, future revenue streams or research programs or may have to grant licenses on terms that may not be favorable to us and/or may reduce the value of our common stock. If we are unable to raise additional funds through equity or debt financings when needed, we may be required to delay, limit, reduce or terminate our product development or future commercialization efforts or grant rights to develop and market our future isotopes and helium and LNG production even if we would otherwise prefer to develop and market such isotopes, helium and LNG ourselves.

Cash Flows

The following table summarizes our sources and uses of cash for each of the periods presented:

 

Nine Months Ended September 30,

 

 

 

2026

 

 

2025

 

Net cash provided by (used in):

 

 

 

 

 

 

Operating activities(1)

 

$

(66,449

)

 

$

(19,935

)

Investing activities

 

 

(19,114

)

 

 

(44,555

)

Financing activities(2)

 

 

34,065

 

 

 

107,485

 

Change in cash and cash equivalents

 

$

(51,498

)

 

$

42,995

 

(1) includes cash flows used in discontinued operations of $1.1 million and $0.8 million for the nine months ended September 30, 2026 and 2025, respectively.

(2) Includes cash flows provided by discontinued operations of $9.1 million for the nine months ended September 30, 2025.

(3) includes cash flows provided by discontinued operations of $45.9 million and $0.6 million for the nine months ended September 30, 2026 and 2025, respectively.

Operating Activities

Net cash used in operating activities was $66.4 million for the nine months ended September 30, 2026, including $1.1 million from discontinued operations, and was primarily attributable to our net loss from continuing operations of $91.6 million, adjusted for a gain on deconsolidation of $19.3 million, gain on extinguishment of convertible notes payable of $11.3 million, stock-based compensation expense of $18.6 million, amortization of right-of-use asset of $0.8 million, depreciation and amortization expense of $6.0 million, change in fair values of investments of $0.1 million, change in fair values for the convertible notes payable of $3.9 million, noncash interest on debt of $4.1 million, change in deferred taxes of $0.7 million and a $1.8 million change in our operating assets and liabilities.

Net cash used in operating activities was $19.9 million for the nine months ended September 30, 2025, and was primarily attributable to our net loss from continuing operations of $96.8 million, adjusted for stock-based compensation expense of $10.8 million, amortization of right-of-use asset of $0.4 million, depreciation expense of $0.9 million, issuance of common stock to a consultant with a fair value of $0.7 million, change in fair values for the convertible notes payable of $64.5 million and a $1.3 million change in our operating assets and liabilities.

Investing Activities

Net cash used in investing activities was $19.1 million for the nine months ended September 30, 2026 and was comprised of purchase of short-term investments of $35.4 million, purchase of Opeongo and ENDRA investment of $14.1 million, cash disposed of upon deconsolidation of Skyline of $44.7 million and the purchases of machinery and equipment, vehicles and construction in progress of $13.6 million, partially offset by maturity of short-term investments of $83.2 million and net cash provided by acquisitions of $4.9 million.

Net cash used in investing activities was $44.6 million for the nine months ended September 30, 2025, including $9.1 million from discontinued operations, and was comprised of the purchases of machinery and equipment, vehicles and construction in progress of $7.3 million, purchase of IsoBio investment of $5.0 million, investment in Skyline of $2.5 million, cash disposed of upon deconsolidation of Skyline of $8.9 million and the advancement of $30.0 million loan to Renergen prior to the close of the acquisition.

Financing Activities

Net cash provided by financing activities was $34.1 million for the nine months ended September 30, 2026, including $45.9 million from discontinued operations, and was comprised primarily of $0.2 million for the exercise of stock options, $0.1 million in proceeds from the issuance of notes payable, partially offset by principal payments on debt, finance leases and bank loans of $9.8 million, distribution to noncontrolling interest of Renergen of $1.5 million and distribution to noncontrolling interest in VIE of $0.5 million.

Net cash provided by financing activities was $107.5 million for the nine months ended September 30, 2025, including $0.6 million from discontinued operations. and was comprised primarily of $103.1 million in proceeds from the issuance of common stock net of issuance costs, $4.9 million in proceeds from the exercise of warrants and $1.0 million in principal payments on debt and finance leases.

50


 

Contractual Obligations and Commitments

Leases

We lease several facilities in the United States and South Africa for office, manufacturing and laboratory space under leases with current combined monthly rent payments of approximately $115,000 with terms expiring between October 31, 2026 and March 31, 2056. We also lease additional space on a short term basis in the United States, South Africa, United Kingdom, and Cayman Islands under leases with current combined monthly rent payments of approximately $32,000.

Promissory Note and Loans

In August 2025, we executed a promissory note payable with a finance company to fund a general liability insurance policy for $0.2 million. We assumed a promissory note in connection with the acquisition of Renergen in January 2026 to fund a general liability insurance policy for approximately $1.1 million. Periodically, we enter into loans to purchase motor vehicles and certain equipment. For the nine months ended September 30, 2026, we entered into new loans totaling $0.1 million. These loans are secured by the underlying assets included in property and equipment. Refer to Note 9 ("Debt") to our condensed consolidated financial statements in this Quarterly Report on Form 10-Q for information regarding interest rates and maturities.

QLE Convertible Notes

As previously discussed, QLE issued the 2025 Convertible Notes, which include certain contractual obligations and commitments. See Note 9 "Debt" for additional information.

Renergen Contractual Obligations and Commitments

As previously discussed, we acquired Renergen (and its indirect 94.5% equity ownership in Tetra4) in January 2026, which entities are subject to certain contractual obligations and commitments discussed further below. See also Note 9 "Debt" for additional information.

Certain Commitments to the South Africa Competition Commission

In connection with our acquisition of Renergen, we made certain commitments to the South Africa Competition Commission designed to address public interest concerns and promote historically disadvantaged persons (“HDP”) and worker ownership. These commitments to the South Africa Competition Commission include: (1) a moratorium on retrenchments of workers at Renergen’s operations for a period of two years from the merger closing date; and (2) a commitment to implement, within 12 months of the merger closing date, a trust for the benefit of qualifying workers employed by Renergen and certain HDP communities and people located within the production rights area of the Virginia Gas Project (the “HDP and Worker Trust”). Upon the effective implementation date of the HDP and Worker Trust, the HDP and Worker Trust are expected to hold an aggregate 5% of the issued shares in Tetra4 and Renergen is expected to hold 89.5% of the issued shares in Tetra4, subject to change in accordance with any capital raising activities of us, Renergen and/or Tetra4 following the merger closing date. In conjunction with the establishment of the HDP and Workers Trust, Tetra4 will issue an offsetting vendor financed loan to the HDP and Worker Trust. The HDP and Worker Trust will continue for the duration of the Production Right held by Tetra4, which will expire during 2042, unless extended.

Normal Course Operating Agreements

In addition, we entered into contracts in the normal course of business with vendors for services and products for operating purposes. These contracts do not contain any minimum purchase commitments and generally provide for termination after a notice period and, therefore, are not considered long-term contractual obligations. Payments due upon cancellation consist only of payments for services provided and expenses incurred up to the date of cancellation.

Off-balance Sheet Arrangements

We did not have during the periods presented, and we do not currently have, any off-balance sheet arrangements, as defined in the rules and regulations of the SEC.

Critical Accounting Policies and Significant Judgments and Estimates

Our condensed consolidated financial statements are prepared in accordance with accounting principles generally accepted in the United States, or U.S. GAAP. In preparing these financial statements, management is required to make estimates and assumptions that affect the reported amount of revenues, expenses, assets, liabilities and the disclosure of contingent liabilities. Actual results may differ from these estimates. Critical accounting estimates are those estimates that involve a significant level of estimation uncertainty and could have a material impact on our financial condition or results of operations.

The most significant estimates in our consolidated financial statements relate to stock-based compensation, fair value of convertible notes, equity and other investments, loss contingencies and the accounting for acquisitions, including goodwill. Although these estimates are based on our knowledge of current events and actions we may undertake in the future, actual results may materially differ from these estimates and assumptions.

Stock-Based Compensation

Stock-based compensation represents a critical accounting estimate because determining the grant-date fair value of equity awards requires significant judgment and the use of assumptions that are inherently uncertain. For stock options and certain other equity awards, we estimate fair value using valuation models that require assumptions regarding expected stock price volatility, expected term, risk-free interest rates, forfeiture rates, and, where applicable, the fair value of our common stock. These assumptions are developed using a combination of historical information, market data, and management's expectations regarding future events.

Changes in these assumptions may materially affect the estimated fair value of awards granted and the amount of compensation expense recognized in future periods. For example, higher assumptions regarding expected volatility, longer expected terms, or increases in the estimated fair value of common stock would generally increase stock-based compensation expense. Such changes would primarily affect operating expenses, loss from operations, and net loss.

Fair Value Measurements of Convertible Notes

The valuation of convertible notes and related embedded features requires significant management judgment, particularly when observable market information is limited. The fair value estimates incorporate assumptions regarding expected volatility of our equity securities, market interest rates, credit risk, probability of conversion, expected term, and other market-based factors. Because certain

51


 

assumptions are not directly observable in the marketplace, changes in estimates could result in materially different fair value measurements.

Changes in these assumptions may result in increases or decreases to the carrying value of the convertible instruments and related liabilities, as well as non-cash gains or losses recognized in the statement of operations. As a result, changes in fair value assumptions could materially affect net loss and earnings per share in future reporting periods.

Equity and Other Investments

We hold investments in certain private and publicly traded companies. Determining the carrying value of these investments, particularly those that do not have readily determinable fair values, requires significant judgment. Our analysis considers available market transactions, financial performance of investee companies, financing activities, industry conditions, macroeconomic factors, and other indicators that may affect fair value or indicate impairment.

If actual operating performance of investee companies differs from our expectations, market conditions deteriorate, or other impairment indicators arise, we may be required to record impairment charges or valuation adjustments. Such adjustments could materially impact other income (expense), net income (loss), and the carrying amount of investments reported on our balance sheet.

Loss Contingencies

We are involved in various legal, regulatory, tax, and other matters arising in the normal course of business. The assessment of loss contingencies requires significant judgment regarding both the likelihood and magnitude of potential losses. When evaluating contingencies, management considers information obtained through investigations, communications with external legal counsel, settlement discussions, prior experience in similar matters, and the status of regulatory or judicial proceedings.

Because these matters are inherently uncertain, actual outcomes may differ significantly from current estimates. Future developments could require us to record additional accruals or reverse previously recorded amounts. Any such changes could materially affect operating expenses, accrued liabilities, net loss, and cash flows in the period in which new information becomes available.

Business Combinations, Intangible Assets and Goodwill

Accounting for acquisitions requires significant estimates and assumptions in determining the fair value of assets acquired and liabilities assumed. The most significant judgments typically relate to estimated future cash flows, customer retention rates, revenue growth assumptions, discount rates, royalty rates, useful lives of acquired intangible assets, and expected synergies. These estimates directly affect the amount assigned to identifiable intangible assets and goodwill.

Changes in assumptions used in purchase accounting could result in adjustments to the recorded values of acquired assets and liabilities during the measurement period. In addition, future changes in market conditions, operating results, or other factors may indicate that goodwill or intangible assets are impaired.

Goodwill impairment assessments are particularly sensitive to assumptions regarding revenue growth, operating margins, projected cash flows, and discount rates. A decline in expected future performance, increases in discount rates, adverse economic conditions, or changes in market multiples could result in impairment charges. Such charges could materially affect operating income, net income, total assets, and stockholders' equity.

See Note 2 to our condensed consolidated financial statements which discusses new accounting pronouncements.

52


 

Item 3. Quantitative and Qualitative Disclosures About Market Risk.

We are a smaller reporting company as defined by Item 10 of Regulation S-K and are not required to provide the information otherwise required under this item.

Item 4. Controls and Procedures.

Disclosure Controls and Procedures

Our management, with the participation of our Chief Executive Officer and Chief Financial Officer, evaluated the effectiveness of our disclosure controls and procedures as of September 30, 2026. The term “disclosure controls and procedures,” as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act, mean controls and other procedures of a company that are designed to ensure that information required to be disclosed by us in the reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms. Disclosure controls include, without limitation, controls and procedures designed to ensure that information required to be disclosed by a company on the reports that it files or submits under the Exchange Act is accumulated and communicated to management, including our principal executive and principal financial officers, as appropriate, to allow timely decisions regarding required disclosure.

Management recognizes that any controls and procedures, no matter how well designed and operated, can provide only reasonable assurance of achieving their objectives, and management necessarily applies its judgement in evaluating the cost-benefit relationship of possible controls and procedures. Based on the evaluation of our disclosure controls and procedures as of September 30, 2026, our Chief Executive Officer and Chief Financial Officer concluded that, as a result of material weaknesses identified in connection with our evaluation of our internal control over financial reporting, as previously disclosed in our Annual Report on Form 10-K (as amended) for the year ended December 31, 2025, our disclosure controls and procedures were not effective as of September 30, 2026.

Management’s Plan for Remediation of the Material Weakness

As previously described in Part II, Item 9A of our Annual Report, we began implementing a remediation plan to address the material weaknesses mentioned in such Annual Report. In order to remediate the material weaknesses, we expect to enhance our formal documentation over internal control procedures and management controls infrastructure to allow for more consistent execution of control procedures and hire additional accounting, and finance and information technology resources or consultants with public company experience. The material weaknesses will not be considered remediated until the applicable controls operate for a sufficient period of time and management has concluded, through testing, that these controls are operating effectively.

Although we intend to complete the remediation process as promptly as possible, we cannot at this time estimate how long it will take to remediate the material weaknesses described in the Annual Report. We may discover additional material weaknesses that require additional time and resources to remediate, and we may decide to take additional measures to address the material weaknesses or modify the remediation steps described above.

Changes in Internal Control

Except for the activities taken related to the remediation of the material weaknesses described in the Annual Report, there has been no change in our internal control over financial reporting as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act during our most recently completed fiscal quarter that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

53


 

PART II-OTHER INFORMATION

Item 1. Legal Proceedings.

Except as described in Note 11 ("Commitments and Contingencies") to our condensed consolidated financial statements in this Quarterly Report on Form 10-Q, we are not currently party to, and our property is not currently the subject of, any material pending legal matters or claims.

In addition, from time to time, we may become subject to arbitration, litigation or claims arising in the ordinary course of business. The results of any current or future claims or proceedings cannot be predicted with certainty, and regardless of the outcome, litigation can have an adverse impact on us because of defense and litigation costs, diversion of management resources, reputational harm and other factors.

Item 1A. Risk Factors.

In addition to the information set forth in this Quarterly Report on Form 10-Q, including under the heading “Special Note Regarding Forward-Looking Statements,” the risks and uncertainties which could adversely affect our business, financial condition, results of operations and future growth prospects that we believe are most important for you to consider are discussed in “Part I, Item 1A—Risk Factors” of our Annual Report on Form 10-K for the year ended December 31, 2025, filed with the SEC on April 10, 2026 and as amended by Amendment No. 1 on Form 10-K/A filed with the SEC on April 30, 2026 and other reports that we file with the SEC, including our Quarterly Reports on Form 10-Q. The risks described in our Annual Report on Form 10-K for the year ended December 31, 2025 (as amended) and such other reports that we file with the SEC are not the only risks we face. Additional risks and uncertainties not presently known to us or that we presently deem less significant may also impair our business operations.

In connection with the Merger, ENDRA filed a Registration Statement on Form S-4 (File No. 333-299256) (the "Registration Statement") with the SEC on October 2, 2026. The section entitled "Risk Factors" of the proxy statement/prospectus (which is preliminary and subject to completion) that is included in the Registration Statement contains additional risk factors relating to the Merger and Renergen’s business, among other matters, and is incorporated by reference herein, and should be read together with the risk factors set forth in this Quarterly Report on Form 10-Q. ENDRA intends to file amendments and/or supplements to the Registration Statement, which will contain important information about the Merger and Renergen. You should read the Registration Statement, including any amendments and supplements to it, and the definitive proxy statement/prospectus, when available, for additional information about the Merger, Renergen and the risks relating to them. The information set forth under the heading “Risk Factors—Risks Related to Renergen” in the Registration Statement is attached hereto for convenience as Exhibit 99.1 and incorporated herein by reference.

Except as set forth in the paragraph above, there have been no material changes to our risk factors as previously disclosed in our Annual Report on Form 10-K for the year ended December 31, 2025 (as amended).

Item 2. Unregistered Sales of Equity Securities and Use of Proceeds.

None.

Item 3. Defaults Upon Senior Securities.

None.

Item 4. Mine Safety Disclosures.

None.

Item 5. Other Information.

 

Director and Officer Trading Arrangements

A portion of the compensation of the Company’s directors and officers (as defined in Rule 16a-1(f) under the Exchange Act) is in the form of equity awards and, from time to time, directors and officers may engage in open-market transactions with respect to the securities acquired pursuant to such equity awards or other Company securities, including to satisfy tax withholding obligations when equity awards vest or are exercised, and for diversification or other personal reasons.

Transactions in Company securities by directors and officers are required to be made in accordance with the Company’s insider trading policy, which requires that the transactions be in accordance with applicable U.S. federal securities laws that prohibit trading while in possession of material nonpublic information. Rule 10b5-1 under the Exchange Act provides an affirmative defense that enables directors and officers to prearrange transactions in the Company’s securities in a manner that avoids concerns about initiating transactions while in possession of material nonpublic information.

On July 10, 2026, Heather Kiessling, the Company’s Chief Financial Officer, terminated a trading arrangement intended to satisfy the affirmative defense conditions of Rule 10b5-1(c) (the “Kiessling Trading Plan”). The Kiessling Trading Plan was originally adopted on December 19, 2025 for the purpose of selling shares of the Company’s common stock in connection with tax withholding obligations incident to the vesting of a restricted stock award, covered the potential sale of up to 92,496 shares of our common stock, and absent such termination, would have terminated on April 14, 2027. As of July 10, 2026, a total of 46,248 shares had been sold pursuant to the Kiessling Trading Plan. No further trades will be executed under the Kiessling Trading Plan.

The Company has implemented mandatory, non-discretionary, "sell-to-cover" arrangements for the purpose of satisfying tax withholding obligations incurred upon the vesting of equity awards in certain of its equity award agreements. This arrangement provides for the automatic sale of shares of the Company’s common stock that would otherwise be issuable on each vesting date of a covered restricted stock award (RSA) in an amount necessary to satisfy the applicable withholding obligation, with the proceeds of the sale delivered to the Company in satisfaction of the applicable withholding obligation. The number of shares that will be sold under these arrangements is not currently determinable as the number will vary based on the extent to which vesting conditions are satisfied, the market price of the Company’s common stock at the time of settlement and the potential future grant of additional RSAs subject to this arrangement.

Other than the trading arrangements described above, during the three months ended September 30, 2026, no director or officer (as defined in Rule 16a-1(f) of the Exchange Act) of ours adopted or terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408(a) of Regulation S-K.

54


 

 

55


 

Item 6. Exhibits.

 

Exhibit

Number

 

Description

2.1

 

Amendment No. 1 to Agreement and Plan of Merger, dated as of October 1, 2026, by and among ENDRA Life Sciences Inc., Kruger Merger Sub LLC, Renergen Limited, Noble Africa LLC and ASP Isotopes Inc. (incorporated by reference to Exhibit 2.1 of the Current Report on Form 8-K filed by ENDRA Life Sciences Inc. on October 1, 2026).

3.1

 

 

Amended and Restated Certificate of Incorporation (incorporated by reference to Exhibit 3.3 to the Form S-1/A filed on November 9, 2022 (File No. 333-267392)).

3.2

 

Amended and Restated Bylaws (incorporated by reference to Exhibit 3.2 to the Annual Report on Form 10-K for the year ended December 31, 2023, filed on April 10, 2024).

10.1

 

Second Amendment and Restatement Agreement, dated August 14, 2026, between Renergen Limited and The Standard Bank of South Africa Limited and countersigned by ASP Isotopes South Africa Proprietary Limited (incorporated by reference to Exhibit 10.1 to the Company's Current Report on Form 8-K filed on August 20, 2026).

10.2

 

Put Option Agreement, dated August 14, 2026, among The Standard Bank of South Africa Limited, ASP Isotopes Inc. and Renergen Limited (incorporated by reference to Exhibit 10.2 to the Company's Current Report on Form 8-K filed on August 20, 2026).

10.3*

 

Fourth Addendum to the Term Loan Facility Agreement, between ASP Isotopes Inc., Renergen Limited and ASP Isotopes South Africa Proprietary Limited, dated May 28, 2026.

10.4*

 

Fifth Addendum to the Term Loan Facility Agreement, between ASP Isotopes Inc., Renergen Limited and ASP Isotopes South Africa Proprietary Limited, dated September 29, 2026.

10.5

 

Non-Employee Director Compensation Policy effective July 1, 2026 (incorporated by reference to Exhibit 10.5 to the Company's Current Report on Form 10-Q filed on August 14, 2026).

10.6

 

Form of Securities Exchange Agreement by and among ASP Isotopes Inc., Quantum Leap Energy LLC and the person or entity identified on the signature page thereto (incorporated by reference to Exhibit 10.1 to the Company's Current Report on Form 8-K filed on July 16, 2026).

10.7*

 

Sale, Subscription And Shareholders’ Agreement between Mahlako Gas Energy Proprietary Limited and Renergen Limited and Tetra4 Proprietary Limited.

31.1*

 

Certification of Principal Executive Officer Required Under Rule 13a-14(a) and 15d-14(a) of the Securities Exchange Act of 1934, as amended.

31.2*

 

Certification of Principal Financial Officer Required Under Rule 13a-14(a) and 15d-14(a) of the Securities Exchange Act of 1934, as amended.

32.1**

 

Certification of Principal Executive Officer and Principal Financial Officer Pursuant to 18 U.S.C. Section 1350, as Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.

99.1*

 

Risks Related to Renergen

101.INS

 

Inline XBRL Instance Document - the instance document does not appear in the Interactive Data File because XBRL tags are embedded within the Inline XBRL document.

101.SCH

 

Inline XBRL Taxonomy Extension Schema With Embedded Linkbase Documents

104

 

Cover Page Interactive Data File (embedded within the Inline XBRL document)

 

* Exhibits filed herewith.

** Exhibits furnished herewith.

+ Management contract or compensatory plan or arrangement.

# Certain schedules, annexes and exhibits have been omitted pursuant to Item 601(b)(2) of Regulation S-K. The Company will furnish copies of any such schedules, annexes and exhibits to the SEC upon request.

56


 

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

 

ASP Isotopes Inc.

Date: November 16, 2026

By:

/s/ Paul E. Mann

Paul E. Mann

Chief Executive Officer, Executive Chairman and Director

(Principal Executive Officer)

Date: November 16, 2026

By:

/s/ Heather Kiessling

Heather Kiessling

Chief Financial Officer

(Principal Financial and Accounting Officer)

 

57


Exhibit 10.3

 

FOURTH ADDENDUM TO THE TERM LOAN FACILITY AGREEMENT

 

 

 

 

Between

 

 

ASP ISOTOPES INCORPORATED

("ASPI")

 

 

 

and

 

 

ASP ISOTOPES SOUTH AFRICA PROPRIETARY LIMITED

("Lender")

 

 

 

and

 

 

RENERGEN LIMITED

("Borrower")

 

each hereinafter referred to individually as a Party and collectively as the Parties.


 

Table of Contents

 

 

Table of Contents

 

1.
DEFINITIONS AND INTERPRETATION 3
2.
INTRODUCTION 3
3.
AMENDMENT 3
4.
CONFLICT 4
5.
COUNTERPARTS 4
6.
GENERAL 4
7.
SIGNATURE 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 


 

WHEREBY the Parties agree as follows -

 

1.
DEFINITIONS AND INTERPRETATION

 

1.1
Capitalised terms used but not defined in this Fourth Addendum shall, unless otherwise stated, bear the meanings given to them in the Term Loan Facility Agreement (as defined below).

 

1.2
For the purposes of interpretation, this Fourth Addendum and the Term Loan Facility Agreement shall at all times be read together.

 

1.3
In the Term Loan Facility Agreement and the Fourth Addendum, the following words shall, unless otherwise stated or inconsistent with the context in which they appear, bear the following meanings and other words derived from the same origins as such words (that is, cognate words) shall bear corresponding meanings:

 

1.4
"Initial Signature Date" means 19 May 2025;

 

1.5
"Term Loan Facility Agreement" means the written term loan facility agreement, entered into between the Parties on the Initial Signature Date, as amended from time to time; and

 

1.6
"Signature Date" means the date when this Fourth Addendum is signed by the last Party in time to do so.

 

2.
INTRODUCTION

 

2.1
The Parties entered into the Term Loan Facility Agreement.

 

2.2
The Parties thereafter entered into a first addendum to the Term Loan Facility Agreement dated 15 January 2026 (the First Addendum), pursuant to which the aggregate facility amount and certain repayment provisions were amended.

 

2.3
The Parties thereafter entered into a second addendum to the Term Loan Facility Agreement dated 26 February 2026 (the Second Addendum), pursuant to which the aggregate principal amount of the loan facility was increased to USD 39,500,000 (thirty-nine million five hundred thousand United States Dollars).
2.4
The Parties thereafter entered into a third addendum to the Term Loan Facility Agreement dated 16 April 2026 (the Third Addendum), pursuant to which the aggregate principal amount of the loan facility was increased to USD 48,600,000 (forty-eight million six hundred thousand United States Dollars).

 

2.5
Pursuant to the Borrower’s ongoing funding requirements, including further drawdowns anticipated during or about May 2026 and June 2026, the Parties now wish to further amend the Term Loan Facility Agreement to increase the aggregate principal amount of the loan facility from USD 48,600,000 (forty-eight million six hundred thousand United States Dollars) to USD 80,000,000 (eighty million United States Dollars).
2.6
This Fourth Addendum records and formalises the agreed amendments to the Term Loan Facility Agreement.

 

3

 


 

3.
AMENDMENT

 

With effect from the Signature Date, the Parties hereby agree to amend clause 3.1.18 of the Term Loan Facility Agreement in accordance with clause 23.2 of the Term Loan Facility Agreement by deleting the reference to “USD 48,600,000 (forty-eight million six hundred thousand United States Dollars)” and replacing it with “USD 80,000,000

(eighty million United States Dollars)”.

4.
CONFLICT

 

4.1
This Fourth Addendum shall supplement the Term Loan Facility Agreement.

 

4.2
In the event of any conflict between the provisions of the Term Loan Facility Agreement and any of the provisions of this Fourth Addendum, this Fourth Addendum shall prevail.

 

5.
COUNTERPARTS

 

This Fourth Addendum may be executed in counterparts, each of which shall be deemed an original, and all of which together shall constitute one and the same agreement as at the Signature Date.

 

6.
GENERAL

 

6.1
No contract varying, adding to, deleting from, or cancelling this Fourth Addendum, and no waiver of any right under this Fourth Addendum, shall be effective unless reduced to writing and signed by or on behalf of the Parties.

 

6.2
This Fourth Addendum contains the entire agreement between the Parties relating to the matters recorded herein, and no Party shall be bound by any undertakings, representations, warranties, promises or the like not recorded in this Fourth Addendum.

 

7.
SIGNATURE

 

Signed on behalf of the Parties set out below, each signatory warrants that he or she has due authority to do so.

[SIGNATURE PAGE FOLLOWS]

4

 


 

 

 

Midrand

SIGNED at on this the 28th day May of 2026.

 

 

For and on behalf of

 

THE LENDER

 

 

 

Signatory: Mangaliso Mithi Capacity: Finance Director

Who warrants his authority hereto

 

 

Berkeley CA

SIGNED at on this the 28th day May of 2026.

 

 

For and on behalf of

 

ASP ISOTOPES INCORPORATED

 

 

Signatory: Robert Ainscow Capacity: COO

Who warrants his authority hereto

 

 

Taiwan

SIGNED at on this the 28th day May of 2026.

 

 

For and on behalf of

 

THE BORROWER

 

 

Signatory: Nick Mitchell Capacity: COO

Who warrants his authority hereto

5

 


Exhibit 10.4

 

FIFTH ADDENDUM TO THE TERM LOAN FACILITY AGREEMENT

 

 

 

 

Between

 

 

ASP ISOTOPES INCORPORATED

("ASPI")

 

 

 

and

 

 

ASP ISOTOPES SOUTH AFRICA PROPRIETARY LIMITED

("Lender")

 

 

 

and

 

 

RENERGEN LIMITED

("Borrower")

 

each hereinafter referred to individually as a Party and collectively as the Parties.


 

Table of Contents

 

 

Table of Contents

 

1.
INTRODUCTION 3
2.
AMENDMENT 4
3.
CONFLICT 4
4.
COUNTERPARTS 4
5.
GENERAL 4
6.
SIGNATURE 5

 

 

 

2

 


 

WHEREBY the Parties agree as follows -

 

1.
DEFINITIONS AND INTERPRETATION

 

1.1
Capitalised terms used but not defined in this Fifth Addendum shall, unless otherwise stated, bear the meanings given to them in the Term Loan Facility Agreement (as defined below).

 

1.2
For the purposes of interpretation, this Fifth Addendum, the Term Loan Facility Agreement shall at all times be read together.

 

1.3
In the Term Loan Facility Agreement and the Fifth Addendum, the following words shall, unless otherwise stated or inconsistent with the context in which they appear, bear the following meanings and other words derived from the same origins as such words (that is, cognate words) shall bear corresponding meanings:

 

1.4
"Initial Signature Date" means 19 May 2025;

 

1.5
"Term Loan Facility Agreement" means the written term loan facility agreement, entered into between the Parties on the Initial Signature Date, as amended from time to time;

 

1.6
"Signature Date" means the date when this Fifth Addendum is signed by the last Party in time to do so; and

 

2.
INTRODUCTION

 

2.1
The Parties entered into the Term Loan Facility Agreement.

 

2.2
Pursuant to the original Term Loan Facility Agreement entered into between the Parties, the Lender agreed to make available to the Borrower a loan facility in the aggregate principal amount of USD 30,000,000 to support the Borrower’s operational funding requirements, including those arising from delays in implementing its Phase 1 Virginia Gas Project.

 

2.3
The Parties thereafter entered into a first addendum to the Term Loan Facility Agreement dated 15 January 2026 (the First Addendum), pursuant to which the aggregate facility amount, and certain repayment provisions were amended.

 

2.4
The Parties thereafter entered into a second addendum to the Term Loan Facility Agreement dated 26 February 2026 (the Second Addendum), pursuant to which the aggregate principal amount of the loan facility was increased to USD 39,500,000(thirty-nine million five hundred thousand United States Dollars).

 

2.5
The Parties thereafter entered into a third addendum to the Term Loan Facility Agreement dated 16 April 2026 (the Third Addendum), pursuant to which the aggregate principal amount of the loan facility was increased to USD 48,600,000 (forty-eight million six hundred thousand United States Dollars).

 

2.6
The Parties thereafter entered into a fourth addendum to the Term Loan Facility Agreement dated 28 May 2026 (the Fourth Addendum), pursuant to which the aggregate principal amount of the loan facility was increased from USD 48,600,000 (forty‑eight million six hundred thousand United States Dollars) to USD 80,000,000 (eighty million United States Dollars).

 

2.7
Pursuant to the Borrower’s ongoing funding requirements, the Parties now wish to further amend the Term Loan Facility Agreement to increase the aggregate principal amount of the loan facility from USD 80,000,000 (eighty million United States Dollars) to USD 120,000,000 (hundred and twenty million United States Dollars).

 

2.8
This fifth Addendum records and formalises the agreed amendments to the original Term

3

 


 

Loan Facility Agreement (the Fifth Addendum).

 

3.
AMENDMENT

 

3.1
With effect from the Signature Date, the Parties hereby agree to amend the following clauses in the Term Loan Facility Agreement in accordance with clause 23.2, as follows:

 

3.1.1
Clause 3.1.18 is amended and replaced by the following:

 

"3.1.18 Facility Amount shall mean the ZAR equivalent of up to US$ 120 000 000 (hundred and twenty million Dollars), to be converted by the Lender on the day of any Advance based on the ZAR to Dollar conversion ratio to purchase ZAR as quoted by its South African bank on such Advance Date;"

3.1.2
Clauses 8.3.1 through to and including 8.4 are amended and replaced by the following:

“8.3.1. USD 10,000,000 (ten million United States Dollars) on or before 31 May 2025; and

8.3.2. an additional USD 10,000,000 (ten million United States Dollars) on or before 30 June 2025; and

provided that the drawdown limitations in clauses 8.3.1 and 8.3.2 reflect the historical restrictions applicable prior to the amendments effected by the First Addendum, Second Addendum, Third Addendum, Fourth Addendum and Fifth Addendum, and shall not limit the Borrower’s entitlement, with effect from the Fifth Addendum, to request Advances up to the aggregate principal amount authorised under the Facility from time to time, provided that the cumulative Advances shall not exceed the Facility Amount.

8.4. For the avoidance of doubt, the cumulative amount drawn down under the Facility (including the USD 10,000,000 (ten million United States Dollars) advanced by the Lender to the Borrower during April 2025, as referenced in clause 5.2) shall be subject to the drawdown limitations applicable from time to time under this Agreement, and shall not at any time exceed the Facility Amount, being the ZAR equivalent of US$ 120,000,000 (hundred and twenty million United States Dollars). “

3.1.3
Clause 8.6 is amended by the insertion of the following sentence at the end of clause

8.6.4:

“For the avoidance of doubt, nothing in this clause 8.6 shall preclude the Lender, in its discretion, from advancing further amounts under the Facility, whether or not any of the circumstances contemplated in clauses 8.6.1 to 8.6.4 apply.”

 

4.
CONFLICT

 

4.1
This Fifth Addendum shall be supplemental to the Term Loan Facility Agreement and subject only to the amendments herein contained.

 

4.2
In the event of any conflict between the provisions of the Term Loan Facility Agreement and any of the provisions of this Fifth Addendum, this Fifth Addendum shall prevail.

 

5.
COUNTERPARTS

 

This Fifth Addendum may be executed in counterparts, each of which shall be deemed an original, and all of which together shall constitute one and the same agreement as at the Signature Date.

 

6.
GENERAL
6.1
No contract varying, adding to, deleting from, or cancelling this Fifth Addendum, and no

4

 


 

waiver of any right under this Fifth Addendum, shall be effective unless reduced to writing and signed by or on behalf of the Parties.
6.2
This Fifth Addendum contains the entire agreement between the Parties relating to the matters recorded herein, and no Party shall be bound by any undertakings, representations, warranties, promises or the like not recorded in this Fifth Addendum.

 

7.
SIGNATURE

Signed on behalf of the Parties set out below, each signatory warrants that he or she has due authority to do so.

[SIGNATURE PAGE FOLLOWS]

 

5

 


 

 

 

 

 

Midrand

SIGNED AT _________________on this the 29th day Sep of 2026.

 

 

For and on behalf of

 

THE LENDER

 

 

Signatory: Mangaliso Mithi

Capacity: Director

Who warrants his authority hereto

 

 

Blairgowrie

SIGNED AT _________________on this the 29th day September of 2026.

 

For and on behalf of

 

ASP ISOTOPES INCORPORATED

 

 

Signatory: Robert Ainscow

Capacity: COO

Who warrants his authority hereto

 

 

Sandton

SIGNED AT _________________on this the 29th day Sep of 2026.

 

 

For and on behalf of

 

THE BORROWER

 

Signatory: Nick Mitchell

Capacity: COO

Who warrants his authority hereto

6

 


 

 

Ex 10.7

 

EXECUTION

SALE, SUBSCRIPTION AND SHAREHOLDERS’ AGREEMENT

 

 

 

 

 

 

 

 

SALE, SUBSCRIPTION AND SHAREHOLDERS’ AGREEMENT

between

 

MAHLAKO GAS ENERGY PROPRIETARY LIMITED

and

 

RENERGEN LIMITED

and

 

TETRA4 PROPRIETARY LIMITED


 

 

 

 

 

 

CONTENTS

 

 

2


 

 

 

 

1.
Definitions 4
2.
Background 13
3.
Conditions Precedent 14
4.
Signature Date Deliverables 15
5.
Duration 16

Part A Subscription and Sale 16

6.
Supplementary Disclosure Letter 16
7.
Subscription and Sale 16
8.
Ownership, Risk and Benefit 18
9.
Securities Transfer Tax 18
10.
Warranties 18
11.
Limitations of liability 19
12.
Indemnity 20
13.
No Duplication 21

Part B Shareholder Terms and Conditions 22

14.
Conflict with the Amended MOI 22
15.
Application of the Subscription Price 22
16.
Undertaking 22
17.
Specially Protected Matters 22
18.
Board Decisions 22
19.
Funding 23
20.
Voluntary Disposal of Equity 24
21.
Involuntary Transfer Provisions 25
22.
Lender consents 26
23.
Determination of Market Value of Shares 26
24.
Provisions to Avoid Conflict Between Clauses 20 and 21 27
25.
Transfers to Affiliates 27
26.
Distributions 28
27.
Put Option 29
28.
Restrictions on Transfer 32
29.
Tag along 32
30.
Non-compete Undertakings 33

Part C General 34

31.
Confidentiality 34
32.
Support 35
33.
Good Faith 35
34.
Binding the Company 36
35.
Breach 36
36.
Disputes 37
37.
Notices and Legal Process 37

 

3


 

 

 

 

38.
Interpretation 38
39.
General and miscellaneous 39

 

 

4


 

 

 

 

 

 

1.
Definitions

Unless otherwise stated, or the context otherwise requires, where used in the Agreement (including any Appendix hereto) the words and expressions listed below shall bear the meanings ascribed to them and cognate expressions shall bear corresponding meanings:

1.1
A Ordinary Shares — means the ‘A’ ordinary shares of no par value in the share capital of the Company, having the preferences, rights, limitations and other terms set out in the Amended MOI;
1.2
Act — means the Companies Act, No. 71 of 2008, as amended from time to time;
1.3
act as an expert and not as an arbitrator — means, in the context of any person determining any matter or dispute in terms of this Agreement, such person doing so on the following basis:
1.3.1
such person shall investigate the matter or dispute in such manner as he in his sole discretion considers appropriate, provided that the expert may not adopt any process which is manifestly biased, unfair or unreasonable;
1.3.2
in carrying out his investigations, such person shall be entitled to consult with any or all of the Parties, or with any other person and to take advice from any third party;
1.3.3
the determination of such person shall be final and binding on the Parties, save in the case of manifest error or fraud;
1.3.4
the costs and charges of such person shall be borne by that Party which, in the sole discretion of such person, is the appropriate Party to bear such costs and charges, provided that such person shall be entitled to direct that the costs and charges be borne by all or certain of the Parties, in such ratios as such person may determine; and
1.3.5
having regard to the sensitivity of any confidential information, the expert shall be entitled to take advice from any person considered by him or it to have expert knowledge with reference to the matter in question;
1.4
Affiliate — means, in respect of any entity, any person who or which, directly or indirectly, Controls, or is Controlled by, or is under common Control with such entity and, for the avoidance of doubt, in the case of the Subscriber, includes all and any other fund, partnership or legal entity managed by Mahlako A Phahla Financial Services Proprietary Limited, registration number 2015/290711/07 and/or Third Way Investment Partners Proprietary Limited, registration number 2015/184672/07, a limited liability private company incorporated in South Africa;
1.5
AFSA — means the Arbitration Foundation of Southern Africa or, should it cease to exist for any reason, such other independent body or person as may be selected, at the request of any Party having an interest in such selection pursuant to the provisions of this Agreement, by the Chairperson for the time being of the Legal Practice Council or its successor in title;

 

5


 

 

 

 

 

 

1.6
Agreement — means this sale, subscription and shareholders agreement, together with all the Appendices hereto;
1.7
Amended MOI — means the amended MOI to be adopted and filed by the Company with the Commission which is in agreed form as set out in Appendix 4;
1.8
Appeal — means the appeals submitted by Natural Justice and the Centre for Environmental Rights (on behalf of the Mining and Environmental Justice Community Network of South Africa and Mining Affected Communities United in Action) on 8 August 2023 in terms of section 43 of the NEMA, read with the National Appeal Regulations, 2014 (published under Government Notice R993 in Government Gazette 38303 of 8 December 2014) against the decision to grant the Environmental Authorisation;
1.9
Appendix — means an addendum or appendix or annexure to this Agreement;
1.10
Applicable Law — means any law (including statutory, common or customary law), statute, constitution, decree, judgment, treaty, regulation, directive, by-law, order, other legislative measure, directive or requirement, request or guideline (whether or not having the force of law but, if not having the force of law, is generally complied with by the persons to whom it is addressed or applied) of any government, local government, statutory, regulation, self-regulatory or similar body, authority or court and the common law, as amended, replaced, re-enacted, restated or reinterpreted from time to time;
1.11
Arbitration Rules — at any time, means the arbitration rules of AFSA at such time, provided that if AFSA has ceased to exist, the latest arbitration rules of AFSA in existence at the time that AFSA ceases to exist, as modified by the arbitrator contemplated in clause 36, in his discretion;
1.12
Auditors — means the auditors of the Company from time to time;
1.13
Baker McKenzie — means Baker McKenzie Inc. of 1 Commerce Square, 39 Rivonia Road, Sandhurst, Johannesburg, South Africa;
1.14
Board — means the board of directors of the Company from time to time;
1.15
Bonisana Agreement — means the settlement agreement entered into by the Company and EPCM Bonisana Proprietary Limited on or about 11 October 2022 for completion of the outstanding works under the Contract for the Design, Supply, Construction & Installation, Commissioning and Testing for the Balance of Plant and All Interconnecting Piping, Electrical Works, Controls, Instrumentation & Associated infrastructure (Contract No: 460000007) between the Company and EPCM Bonisana dated 4 December 2019 (as amended);

 

6


 

 

 

 

 

 

1.16
Budgeted Funding Requirement — means the funding required for Phase II, as set out in the financial model as at the date of financial close of the Phase II Debt Funding;
1.17
Business — means the business of the Company from time to time, being the business of the exploration, development and production of liquid helium and liquid natural gases;
1.18
Business Day — means any day which is not a Saturday, Sunday or an official public holiday in South Africa;
1.19
Business Rescue — shall have a meaning which is the same as or analogous to the meaning attributed to such term in section 128(1)(b) of the Act;
1.20
Claims — means all claims on loan account which the Shareholders, or any of them, may have against the Company from time to time and includes any interest which has accrued on any such claims;
1.21
Closing Date — means the 20th Business Day after the date on which all of the Conditions Precedent have been fulfilled, or such earlier date as the Subscriber and Renergen may agree in writing;
1.22
Commission — means the Companies and Intellectual Property Commission established by section 185 of the Act;
1.23
Company — means Tetra4 Proprietary Limited, registration number 2005/012157/07, a limited liability private company incorporated in South Africa;
1.24
Company’s Designated Account — means Account name :
Account type :
Bank :
Account number :
Branch code :

or such other bank account as may at any time be specified by reasonable notice in writing by the Company;

1.25
Competition Act means the Competition Act, No. 89 of 1998 as amended from time to time;
1.26
Competition Authorities means the Competition Commission or the Competition Tribunal established pursuant to Chapter 4, Part B of the Competition Act or the Competition Appeal Court established pursuant to Chapter 4, Part C of the Competition Act, as the case may be;

 

7


 

 

 

 

 

 

1.27
Conditions Precedent — means the conditions precedent recorded in clause 3.1;
1.28
Control — shall have a meaning which is the same as or analogous to the meaning attributed to such term in section 2(2) of the Act;
1.29
Debt Term Sheet — means the term sheet to be concluded between DFC, Renergen, the Company and SBSA, relating to the New SBSA Loan and the New DFC Loan in substantially the form as the draft submitted to the DFC on 12 September 2023;
1.30
Deed of Adherence — means the deed of adherence set out in Appendix 3;
1.31
DFC — means the United States International Development Finance Corporation, a development finance institution and agency of the United States federal government;
1.32
DFC Security Documents — means the limited recourse guarantee and security cession to be entered into between the Subscriber and DFC in relation to the Transaction Shares and pursuant to the Existing DFC Financing Documents, on terms and conditions which are mutatis mutandis substantially the same as, and no more onerous than, the terms and conditions of the Existing DFC Security Documents and otherwise on terms and conditions reasonably acceptable to the Subscriber;
1.33
Disclosure Letter - means the disclosure letter attached to this Agreement as Appendix 6;
1.34
Dispose — means to sell, exchange, donate, lend, transfer, realise, alienate, cede or assign or in any manner whatsoever dispose or grant any option over, or realise any value directly or indirectly therefrom (other than payments from the Company in terms of section 46 of the Act) or to enter into any agreement or arrangement in respect the rights to vote or rights to payments attaching to Shares and “Dispose of” and “Disposal” shall have corresponding meanings;
1.35
Due Diligence Reports — means the legal due diligence report prepared by Baker McKenzie dated 31 July 2023, the financial and tax due diligence report prepared by Ernst & Young Advisory Services Proprietary Limited dated 25 July 2023, the insurance due diligence report prepared by Marsh Proprietary Limited dated 31 July 2023, the technical due diligence report prepared by SLR Consulting Limited dated 6 July 2023 and the environmental and social due diligence report prepared by IBIS Environmental Social Governance Consulting South Africa Proprietary Limited dated 31 July 2023;
1.36
Due Diligence — means the due diligence investigation conducted by the Subscriber and its advisors into, inter alia, the business, financial, human resources, tax, accounting, commercial, environmental, operational, regulatory and legal affairs of the Company prior to the Signature Date;

 

8


 

 

 

 

 

 

1.37
Environmental Authorisation — means the environmental authorisation issued to the Company by Mr Jacob Mbele, Director-General of the Department of Mineral Resources and Energy, on 13 July 2023 in terms of section 24 of the NEMA to undertake the Project under environmental authorisation application reference number 12/4/007;
1.38
Equity — means in relation to any Shareholder, such Shareholder’s Shares and Claims, if any;
1.39
Exclusion List — means the list of prohibited activities listed in Appendix 6;
1.40
Existing Debt - means the aggregate of the amount owing by the Company in terms of the Existing Financing Documents;
1.41
Existing DFC Financing Documents — means the agreements entered into between the Company and the DFC prior to the Signature Date in relation to the loan advanced by the DFC to the Company in the amount of US$40 000 000 (forty million United States Dollars);
1.42
Existing DFC Security Documents — means the guarantee, security cession and subordination agreement entered into between Renergen, the Company and DFC pursuant to the Existing DFC Funding Documents;
1.43
Existing Financing Documents means, collectively, the Existing DFC Financing Documents, the Existing DFC Security Documents, the IDC Financing Documents, the IDC Security Documents and the Molopo Financing Documents;
1.44
Fairly Disclosed — means disclosed in writing with sufficient detail to enable the Subscriber or its advisors, acting reasonably, to: (i) identify the nature and scope of the matters disclosed; and (ii) make an informed assessment of the matters which are the subject of the disclosures concerned;
1.45
IDC — means the Industrial Development Corporation of South Africa Limited;
1.46
IDC Funding Documents — means the financing agreements entered into between the Company and the IDC prior to the Signature Date in relation to the loan advanced by IDC to the Company in the amount of R160 704 000 (one hundred and sixty million seven hundred and four thousand Rands);
1.47
IDC Security Documents — means a reversionary cession and pledge in relation to the IDC Funding Documents;
1.48
IFRS — means International Financial Reporting Standards, as amended from time to time;
1.49
Independent Expert — means such auditing firm, investment bank or corporate finance advisory firm as may be agreed in writing between the

 

9


 

 

 

 

Subscriber and Renergen, or failing agreement within 5 Business Days from the date of a

 

10


 

 

 

 

 

 

written request by either such Party for such agreement, appointed by the Chairperson, or failing him, then by the most senior officer for the time being of the Industrial Gas Users Association of Southern Africa from an independent reputable auditing firm, investment bank or corporate finance advisory firm;

1.50
Investor Trigger Event shall have the meaning ascribed thereto in clause 21.2;
1.51
Lenders — means the United States International Development Finance Corporation (“DFC) and the Industrial Development Corporation of South Africa Limited (“IDC”) under the Existing Financing Documents, and DFC; the Standard Bank of South Africa (“SBSA”) including inter alia any agent, and/or party that becomes a lender, from time to time, under the New Financing Documents;
1.52
Longstop Date — means 31 March 2024 or such other date as the Parties may agree to in writing;
1.53
Loss — means any and all actions, claims, losses and liabilities (whether contingent or actual), including but not limited to charges, costs (including legal and other professional costs), damages, expenses, amounts paid in settlement, fines, interest, judgments, penalties of any nature whatsoever, including, in each case, all related Tax;
1.54
Mahlako Energy Fund — means Mahlako Energy Fund I Partnership, acting through Mahlako Energy Fund Proprietary Limited, registration number 2019/107411/07, a limited liability private company incorporated in South Africa;
1.55
Market Value — means the market value of the relevant Share and Claims (if any) determined in accordance with the provisions of clause 23;
1.56
Molopo — means Molopo Energy Limited, registration number ACN003152154, a company incorporated in accordance with the laws of Australia;
1.57
NEMA means the National Environmental Management Act 107 of 1998;
1.58
Molopo Financing Documents — means the financing agreements entered into between the Company and the Molopo prior to the Signature Date in relation to the loan advanced by Molopo to the Company in the amount of R50 000 000 (fifty million Rand);
1.59
New DFC Loan — means an amount of not less than US$535 000 000 (five hundred and thirty-five million United States Dollars) to be lent and advanced by the DFC to the Company in terms of the New Financing Documents;
1.60
New Financing Documents means the agreements to be entered into between the Company, the DFC and SBSA after the Signature Date pursuant to the Debt

 

11


 

 

 

 

Term Sheet, in terms of which DFC will lend and advance the New DFC Loan

 

12


 

 

 

 

 

 

and SBSA will lend and advance the New SBSA Loan to the Company on substantially the same terms and conditions as the Debt Term Sheet for the purposes of, inter alia, refinancing the Existing Debt and financing Phase II;

1.61
New SBSA Loan — means an amount of not less than USD260 000 000 (two hundred and sixty million United States Dollars) to be lent and advanced by SBSA to the Company in terms of the New Financing Documents;
1.62
New Security Documents — means the limited recourse guarantee and security cession to be entered into between inter alia the Subscriber, DFC, SBSA and Tetra4 pursuant to the New Financing Documents and on market related terms and conditions which are usual for a transaction of that nature and which are substantially the same as the terms and conditions of the Existing Security Documents;
1.63
Ordinary Shares means an ordinary share of no par value in the share capital of the Company having the preferences, rights, limitations and other terms set out in the Amended MOI and which shall exclude, for the avoidance of doubt, A Ordinary Shares;
1.64
Parties — means the signatories to this Agreement and any other person who binds themselves to the provisions of this Agreement as a Shareholder by signing the Deed of Adherence and “Party” refers to any one of the Parties as the context may require;
1.65
Performance Standards — means those IFC Performance Standards on Environmental and Social Sustainability in force as at the Signature Date set out in Appendix 7;
1.66
Phase I — means the first phase of the development and commercialisation of the helium and natural gas field in Virginia comprised of the development and construction of the: (a) gas gathering system; (b) liquefaction plant; and (c) phase I wells;
1.67
Phase II — means the development and commercialisation of the helium and natural gas field in Virginia, South Africa, being developed by the Company, pursuant to the completion of certain project development milestones comprised of a: (a) gas gathering system; and (b) liquefaction plant, excluding Phase I;
1.68
Phase II Debt Funding — means, collectively, that portion of the New DFC Loan and the New SBSA Loan remaining after the repayment of the Existing Debt;
1.69
Prescribed Ratio — means the ratio inter se, in which the Shareholders are entitled to exercise the voting rights exercisable by the holders of Ordinary Shares and A Ordinary Shares collectively, from time to time;

 

13


 

 

 

 

 

 

1.70
Project — means the development of the helium and natural gas field in Virginia under production right 12/4/07 held by the Company and entitled the “Virginia Gas Project”;
1.71
Put Option Event — means one or more of the events contemplated in clauses

27.6.1 to 27.6.5;

1.72
R or Rand — means South African Rand, the lawful currency of South Africa;
1.73
Renergen — means Renergen Limited, registration number 2014/195093/06, a public company incorporated in terms of the laws of South Africa;
1.74
Renergen Contribution — means the aggregate of USD297,500,000 (two hundred and ninety-seven million five hundred thousand United States Dollars) and R450, 000, 000 (four hundred and fifty million Rand) to be contributed by Renergen to the Company by way of subscription for Ordinary Shares in terms of clause 19.4.2 which is anticipated to be raised by Renergen by way of equity capital pursuant to its proposed initial public offering and subsequent equity capital raisings on Nasdaq or by any other means for the aggregate of USD297,500,000 (two hundred and ninety-seven million five hundred thousand United States Dollars) and R450, 000, 000 (four hundred and fifty million Rand);
1.75
Renergen Sale Price — means an aggregate amount of R285 000 000 (two hundred and eighty five million Rand);
1.76
Renergen Sale Shares - means 2850 (two thousand eight hundred and fifty) A Ordinary Shares;
1.77
Renergen’s Designated Account — means

Account name :

Account type :

Bank :

Account number :

Branch code :

or such other bank account as may at any time be specified by reasonable notice in writing by Renergen;

1.78
Restraint Period — means the period during which a Shareholder directly or indirectly holds any Shares in the Company;
1.79
Sanctions List — means the consolidated United Nations Security Council Sanctions List maintained by the United Nations Security Council from time to time;

 

14


 

 

 

 

 

 

1.80
SBSA — means the Standard Bank of South Africa Limited (acting through its Corporate and Investment Banking Division);
1.81
Securities — shall have a meaning which is the same as or analogous to the meaning attributed to such term in section 2(2) of the Act;
1.82
Securities Transfer Tax — means securities transfer tax payable in accordance with the provisions of the Securities Transfer Tax Act, No. 25 of 2007;
1.83
Shareholders — means the registered holders of Shares and/or Securities issued by the Company from time to time, who are Parties to this Agreement and/or bound to all the terms and conditions of this Agreement;
1.84
Shares — means collectively and individually, the Ordinary Shares and/or the A Ordinary Shares, as the case may be;
1.85
Signature Date — means the date on which this Agreement is signed by the last signing Party;
1.86
South Africa — means the Republic of South Africa;
1.87
Specially Protected Matter — means any matter contemplated in Appendix 2;
1.88
Subscriber — Mahlako Gas Energy Proprietary Limited, registration number 2023/826238/07, a limited liability private company incorporated in South Africa;
1.89
Subscriber Trigger Event shall have the meaning ascribed thereto in clause 21.1;
1.90
Subscription Price — means an aggregate amount of R265 000 000 (two hundred and sixty-five million Rand);
1.91
Subscription Shares — means 2650 (two thousand six hundred and fifty) A Ordinary Shares;
1.92
Subsidiary — shall bear the meaning assigned to such term in the Act;
1.93
Supplementary Disclosure Letter - means the supplementary disclosure letter which shall be in the same form as the Disclosure Letter and which shall only disclose matters occurring after, or which the Warrantor can reasonably demonstrate it was not aware of despite having made due and careful inquiry at the Signature Date, it being acknowledged and agreed that the Warrantor shall not be permitted to rectify errors or omissions in the Disclosure Letter by making supplementary disclosure in the Disclosure Letter;
1.94
Surviving Provisions — means clauses 1, 3, 4, 5 and clauses 33 to 39 (both inclusive);

 

15


 

 

 

 

 

 

1.95
Tax Warranties — means the Warranties contained in paragraph 28 of Appendix 1 and "Tax Warranty" shall mean any one of them, as the context requires;
1.96
Taxes — means all taxes, charges, imposts, levies, deductions, withholdings or fees of any kind whatsoever, or any amount payable on account of or as security for any of the aforegoing by whomsoever and on whomsoever imposed, levied, collected, withheld or assessed, together with any penalties, additions, fines, surcharges or interest relating thereto in terms of any tax legislation, and “Tax” and “Taxation” shall be construed accordingly;
1.97
Transaction — means the subscription by the Subscriber for the Subscription Shares and the sale by Renergen of the Renergen Sale Shares to the Subscriber, on the terms and conditions of, and all other matters, actions and transactions contemplated in, the Transaction Documents;
1.98
Transaction Documents — means this Agreement and the Amended MOI;
1.99
Transaction Price — means the sum of the Subscription Price and the Renergen Sale Price;
1.100
Transaction Shares - means 5500 (five thousand five hundred) A Ordinary Shares;
1.101
Trigger Event — shall have the meaning ascribed thereto in clause 21.3;
1.102
USD — means the United States Dollar, the lawful currency of the United States of America;
1.103
Virtual Data Room — means the virtual data room populated by Renergen in conjunction with the Company for purposes of the Due Diligence, the index of which is attached as Appendix 9;
1.104
Warranties — shall have the meaning ascribed thereto in clause 10.2; and
1.105
Warrantor — means Renergen.

 

2.
Background
2.1
The Company holds the first and only fully-licensed domestic onshore petroleum production right issued in South Africa with licenses that include but are not limited to a production right, environmental impact assessment, water use and National Energy Regulator of South Africa licenses in respect of the Project.
2.2
The Subscriber wishes to make a 5.5% (five and a half percent) strategic investment into the Company and thereby the Project as part of the funding of Phase II, expected to commence production in or about 2026, the Parties thereby recognising the strategic upside and economic value in funding the development of Phase II.

 

16


 

 

 

 

 

 

2.3
Renergen currently holds 100% of the issued Shares of the Company comprising 100 Ordinary Shares.
2.4
The Subscriber accordingly wishes to:
2.4.1
subscribe for the Subscription Shares, and the Company wishes to allot and issue the Subscription Shares to the Subscriber on the terms and subject to the conditions of this Agreement; and
2.4.2
purchase the Renergen Sale Shares, and Renergen wishes to sell the Renergen Sale Shares to the Subscriber on the terms and subject to the conditions of this Agreement.
2.5
The Parties have accordingly agreed to enter into this Agreement in order to provide for:
2.5.1
the subscription arrangements and the rights and obligations of the Subscriber in relation to the Subscription Shares to be subscribed for by it;
2.5.2
the sale of the Renergen Sale Shares to the Subscriber; and
2.5.3
the relationships between the Shareholders inter se and between the Shareholders and the Company.
3.
Conditions Precedent
3.1
Save for clause 4 and the Surviving Provisions, all of which will become effective immediately, this Agreement is subject to the fulfilment of the following Conditions Precedent by no later than the Longstop Date:
3.1.1
the Company shall have obtained the written consent and waiver of all claims from the DFC in respect of the Bonisana Agreement and any payments made pursuant thereto, in a form acceptable to the Subscriber;
3.1.2
the Company and Renergen shall have obtained all necessary consents from the DFC and the IDC, to the extent required, in order to conclude and implement the Transaction Documents, including (i) consent to the issue of the Renergen Sale Shares to Renergen, their subsequent release from any security given in favour of the DFC and/or IDC and consent to the sale of the Renergen Sale Shares to the Subscriber; (ii) the release of the Put Equity from any security given in favour of the DFC and/or IDC and consent to the sale and transfer thereof by the Subscriber to Renergen (on condition that the Put Equity is thereafter immediately subject to the security given by Renergen to the DFC and/or the IDC over all other shares held by it in the Company) purusant to exercise by the Subscriber of the Put Option in terms of this Agreement, all on terms and conditions acceptable to the Subscriber, acting reasonably;
3.1.3
the Company shall have delivered evidence to the reasonable satisfaction of the Subscriber of the terms agreed upon between the Company and each of the DFC and the Standard Bank of South Africa Limited relating to the advance of the New DFC Loan and the New SBSA Loan;
3.1.4
the Company shall have no outstanding shareholder loans, as evidenced by a written confirmation to that effect from the chief financial officer of the Company

 

17


 

 

 

 

to the Subscriber;

 

18


 

 

 

 

 

 

3.1.5
the Subscriber shall have delivered written confirmation to the Company and Renergen that it has informed its co-investors of the provisions of the Transaction Documents and the obligations contained therein, including but not limited to, the obligations contained in clause 21;
3.1.6
the DFC Security Documents shall have been entered into by the parties thereto;
3.1.7
the A Ordinary Shares shall have been validly created and are capable of being issued to the Subscriber on the Closing Date as evidenced by a special resolution of the sole shareholder of the Company being lodged with the Commission in the manner prescribed in the Act and the Commission having accepted same and confirmed that it has placed it on file; and
3.1.8
the Company shall have lodged the Amended MOI with the Commission in the manner prescribed in the Act and the Commission has accepted the Amended MOI and confirmed that it has placed it on file.
3.2
The Conditions Precedent in:
3.2.1
clauses 3.1.3 3.1.4 and 3.1.7 are stipulated for the benefit of the Subscriber and may be waived (in whole or in part) by the Subscriber in writing;
3.2.2
clause 3.1.5 is stipulated for the benefit of Renergen and may be waived (in whole or in part) by Renergen in writing; and
3.2.3
clause 3.1.1, 3.1.2, 3.1.6 and 3.1.8 are stipulated for the benefit of the Subscriber and Renergen and may only be waived (in whole or in part) by both the Subscriber and Renergen in writing.
3.3
The Subscriber and Renergen shall be entitled to extend the time and/or date for fulfilment of any Condition Precedent by prior written agreement between them from time to time, provided that such extension shall not be beyond the Long-Stop Date.
3.4
The Parties shall use reasonable endeavours to procure the fulfilment of the Conditions Precedent contained in clause 3.1, as soon as reasonably possible after the Signature Date but by no later than the Longstop Date.
3.5
Unless the Conditions Precedent have been fulfilled by not later than the Longstop Date, the provisions of this Agreement, save for the Surviving Provisions all of which will remain of full force and effect, will never become of any force or effect and the status quo ante will be restored as near as may be and neither of the Parties will have any claim against the other in terms hereof or arising from the failure of the Conditions Precedent.
4.
Signature Date Deliverables
4.1
By no later than the Signature Date:
4.1.1
the Company shall deliver to the Subscriber a copy of the resolutions of the Board unconditionally approving the (i) entering into and implementation of this Agreement and authorising the person who signed this Agreement on behalf of the Company to do so; and (ii) the Transaction;

 

19


 

 

 

 

4.1.2
the Subscriber shall deliver to Renergen:

 

20


 

 

 

 

 

 

4.1.2.1
a copy of the resolutions of its board of directors unconditionally approving the (i) entering into and implementation of this Agreement and authorising the person who signed this Agreement on behalf of the Subscriber to do so; and

(ii) the Transaction; and

4.1.2.2
a certificate signed by the Subscriber confirming that so far as the Subscriber is aware, this Agreement and the Transaction do not breach any of the Performance Standards insofar as the Subscriber and/or its Affiliates are concerned; and
4.1.3
Renergen shall deliver to the Subscriber a copy of the resolutions of its board of directors unconditionally approving the (i) entering into and implementation of this Agreement and authorising the person who signed this Agreement on behalf of Renergen to do so, and (ii) the Transaction.
5.
Duration
5.1
This Agreement shall, subject to the provisions of clause 3 in relation to the Surviving Provisions, commence on the Closing Date and remain in full force and effect and binding on each of the Shareholders:
5.1.1
unless this Agreement is terminated by written agreement between all of the Parties, or otherwise in accordance with its terms prior to the Closing Date; and
5.1.2
after the Closing Date until there is at any time only one Shareholder, unless terminated by written agreement between all of the Parties or otherwise in accordance with its terms.
5.2
Notwithstanding the foregoing, the provisions of clauses 14 to 30 (both inclusive) shall cease to bind a Party when it ceases to be a Shareholder.

Part A Subscription and Sale

6.
Supplementary Disclosure Letter
6.1
The Company shall, not later than three (3) Business Days prior to the Closing Date, deliver the Supplementary Disclosure Letter, together with copies of all supporting documents, to the Subscriber.
6.2
Should the Supplementary Disclosure Letter disclose any fact, matter or circumstance which, in the Subscriber's sole discretion, has a material adverse effect on the business, prospects and/or financial position of the Company or the Subscriber's decision to enter into the Transaction, then the Subscriber shall be entitled, on written notice to the Company at any time after the date of receipt of the Supplementary Disclosure Letter and prior to the intended Closing Date, to terminate this Agreement with immediate effect, and no other Party shall have any claim whatsoever against the Subscriber as a consequence.
7.
Subscription and Sale
7.1
On the Closing Date, the Subscriber:
7.1.1
subscribes for the Subscription Shares for the Subscription Price; and

 

21


 

 

 

 

 

 

7.1.2
shall pay the Subscription Price, to the Company, by way of electronic funds transfer in immediately available funds without deduction or set-off, into the Company’s Designated Account;
7.2
Contemporaneously with the subscription described in clause 7.1, on the Closing Date:
7.2.1
Renergen sells to the Subscriber and the Subscriber purchases from Renergen, the Renergen Sale Shares; and
7.2.2
the Subscriber shall pay the Renergen Sale Price to Renergen into Renergen’s Designated Account, and shall deliver to Renergen proof of payment of the Renergen Sale Price.
7.3
On the Closing Date, against fulfilment by the Subscriber of its obligations in terms of clause 7.1.2, the Company shall:
7.3.1
issue the Subscription Shares to the Subscriber;
7.3.2
issue and deliver to the Subscriber a share certificate in respect of the Subscription Shares (which shall be delivered by the Subscriber to the Lenders in terms of the New Security Documents); and
7.3.3
make such entries in its share register as are required to record the Subscriber as the registered holder of the Subscription Shares and deliver a copy of the updated share register to each of the Subscriber and the Lenders thereafter.
7.4
On the Closing Date, against fulfilment by the Subscriber of its obligations in terms of clause 7.2.2, Renergen shall:
7.4.1
deliver to the Subscriber the existing share certificate issued in the name of Renergen in respect of the Renergen Sale Shares;
7.4.2
deliver to the Subscriber a duly executed share transfer form in respect of the transfer of the Renergen Sale Shares;
7.4.3
deliver to the Subscriber, a copy of a resolution passed by the Board:
7.4.3.1
authorising the registration of the transfer of the Renergen Sale Shares from Renergen to the Subscriber;
7.4.3.2
authorising the registration in the Company’s securities register of the

Subscriber as the holder of the Renergen Sale Shares; and

7.4.3.3
approving the issue of appropriate new share certificate(s) to the Subscriber for the Renergen Sale Shares registered in its name.
7.4.4
procure that the Company:
7.4.4.1
cancels the old share certificate in respect of the Renergen Sale Shares;
7.4.4.2
updates its securities register, to reflect the sale and transfer of the Renergen Sale Shares to the Subscriber and deliver a copy of such updated securities register to each of the Subscriber and the Lenders thereafter; and
7.4.4.3
issues to the Subscriber a new share certificate in respect of the Renergen Sale Shares and deliver such share certificate to the Subscriber (which shall be

 

22


 

 

 

 

 

 

delivered by the Subscriber to the Lenders in terms of the New Security Documents).

8.
Ownership, Risk and Benefit
8.1
Ownership, benefit and risk:
8.1.1
in the Subscription Shares shall pass to the Subscriber on the Closing Date, against compliance by the Subscriber with its payment obligations in terms of clause 7.1.2; and
8.1.2
in the Renergen Sale Shares shall pass to the Subscriber on the Closing Date against payment of the Renergen Sale Price to Renergen in accordance with clause 7.2.2.
9.
Securities Transfer Tax

The Company shall be liable for and shall pay the Securities Transfer Tax, equal to an amount of R712 500, payable in respect of the sale of the Renergen Sale Shares to the Subscriber in terms of this Agreement.

10.
Warranties
10.1
As of the date hereof and on the Closing Date, each Party represents and warrants to the other Party that:
10.1.1
such Party is duly incorporated (or registered, as the case may be), validly subsisting and in good standing under the laws of the jurisdiction of its incorporation;
10.1.2
such Party has all the requisite authority, capacity and power to execute and deliver this Agreement and to perform its obligations hereunder;
10.1.3
the natural person(s) who sign and execute this Agreement on a Party’s behalf are validly and duly authorised to do so;
10.1.4
no proceedings are pending, and (without having made enquiry of any third parties) such Party is not aware of any basis for institutions of any proceedings, for its dissolution or winding-up or the placing of such Party in bankruptcy or subject to any laws governing the affairs of insolvent persons; and
10.1.5
such Party is fully aware of and acquainted with the provisions of this Agreement and the meaning and effect of all the provisions contained herein.
10.2
The Warrantor hereby gives the Subscriber the representations and warranties set out in Appendix 1, section 2 (the “Warranties”) on the Signature Date and the Closing Date.
10.3
Information Fairly Disclosed prior to the Signature Date, including in the Virtual Data Room and the Disclosure Letter and information Fairly Disclosed in the Supplementary Disclosure Letter shall qualify each of the Warranties, such that the Warrantor shall not be liable for any claim in respect of a Warranty to the extent that any fact, information or matter giving rise to such claim was Fairly Disclosed.

 

23


 

 

 

 

 

 

10.4
Insofar as any Warranty is promissory or relates to a future event, it will be deemed to have been given as at the date of fulfilment of the promise or the happening of the event, as the case may be, provided that no such Warranty shall be construed as to extend to (i) the occurrence of any fact, matter or event arising after the Closing Date; and (ii) any knowledge acquired by the Warrantors after the Closing Date.
10.5
This Agreement is entered into by the Subscriber relying on the Warranties given by the Warrantor, each of which is: (i) deemed to be material and a material representation inducing the Subscriber to enter into this Agreement; and (ii) an essential contractual undertaking by Warrantor, as the case may be, to ensure that the relevant Warranty is true and correct.
10.6
Each Warranty shall be a separate Warranty and shall in no way be limited to, or restricted by, reference to, or by inference from, the terms of any other Warranty, or by any words in this Agreement.
10.7
The Warranties will be qualified by the actual knowledge of the Subscriber, which actual knowledge, for the purposes of this clause 10, shall be deemed to include matters Fairly Disclosed in the Due Diligence Reports.
10.8
For purposes of this clause 10, the Subscriber shall be deemed to have suffered a Loss equal to 5.5% of any Loss suffered by the Company as a result of any Warranty being breached.
11.
Limitations of liability
11.1
Notwithstanding anything to the contrary contained anywhere else in this Agreement, the liability of the Warrantor for any Warranty claim shall be limited in accordance with the following provisions:
11.1.1
any claim, Losses and/or liabilities in respect of a Fundamental Warranty will be wholly barred and unenforceable unless written notice in respect thereof is delivered to the Warrantor within a period of 3 (three) years after the Closing Date;
11.1.2
any claim, Losses and/or liabilities in respect of a Tax Warranty will be wholly barred and unenforceable unless written notice in respect thereof is delivered to he Warrantor within a period of 5 (five) years after the Closing Date;
11.1.3
any claim, Losses and/or liabilities in respect of a General Warranty will be wholly barred and unenforceable unless written notice in respect thereof is delivered to the Warrantor within a period of 2 (two) years after the Closing Date;
11.1.4
any Warranty claim that arises from the same facts or circumstances shall be aggregated together as a single Warranty claim and the Subscriber shall have no Warranty claim against the Warrantor, unless that Warranty claim exceeds an amount equal to R5 000 000 (five million Rand) for each and every such Loss;
11.1.5
the Subscriber shall not have any Warranty claim against the Warrantor as a result of, or in connection with, any Loss, unless each individual claim in excess of R5 000 000 (five million Rand) referred to in clause 11.1.4 exceeds, in the aggregate, an amount equal to R10 000 000 (ten million Rand), and then the Subscriber shall be entitled to claim the full amount of its Loss and not just the

 

24


 

 

 

 

 

 

amount by which its Warranty claims(s) exceed R5 000 000 (five million Rand) and/or R10 000 000 (ten million Rand), as the case may be; and

11.1.6
the maximum aggregate amount that the Subscriber shall be entitled to recover from the Warrantor collectively, for, in respect of Part A of this Agreement relating to any and all (a) Warranty claims and (b) claims in respect of the indemnities set out in clause 12.1, shall be an amount equal to the aggregate Transaction Price received by the Company from the Subscriber.
11.2
Nothing in this Agreement shall be deemed to relieve or reduce any obligation which the Subscriber may have in law to mitigate any Loss which the Subscriber may suffer or to mitigate any fact, matter, event or circumstance likely to give rise to a Warranty claim.
11.3
Nothing in this clause 11 shall qualify or limit the liability in time or money in respect of any claim against the Warrantor:
11.3.1
for fraud or fraudulent misrepresentation or fraudulent non-disclosure; and/or
11.3.2
pursuant to Part B of this Agreement.
11.4
The amount of any Losses recoverable in relation to any Warranty claim shall be net of any: (i) amounts actually recovered by the Subscriber under any insurance policies (less any portion thereof that the Subscriber may be obliged to pay to any insurer); or (ii) Tax benefit (as contemplated in the definition of a “tax benefit” in section 1 of the Income Tax Act, 58 of 1962, as amended) received by the Subscriber as a result of the Losses incurred or suffered by the Subscriber.
11.5
The Warrantor shall have no liability in respect of any Warranty claim which is based on any liability which is contingent unless and until such contingent liability becomes an actual liability.
11.6
The Warrantor shall not be liable for any Warranty claim to the extent that it would not have arisen but for, or has been increased or not reduced as a result of, any:
11.6.1
material breach by the Subscriber of its obligations under this Agreement;
11.6.2
voluntary act, omission or transaction carried out after the Closing Date, by the Subscriber (or its respective directors, employees or agents or successors in title or any of its Affiliates) outside the ordinary and usual course of business; or
11.6.3
act, omission or transaction carried out before the Closing Date, by the Warrantor, acting in accordance with this Agreement or at the written direction or request or with the written approval of the Subscriber.
11.7
The Subscriber shall not be entitled to claim against the Warrantor for any punitive, special or consequential Loss or expenses including, but not limited to, loss of profit or business.
12.
Indemnity
12.1
Renergen hereby indemnifies the Subscriber against all and any Loss suffered by the Company or the Subscriber (it being agreed that where the Company suffers the Loss in respect of any of the below indemnities, the Subscriber shall be deemed to have

 

25


 

 

 

 

 

 

suffered a Loss equal to 5.5% of any Loss suffered by the Company) in connection with or arising from:

12.1.1
the Environmental Authorisation being set aside and the Company having to conduct any remedial or other action in respect of (i) the Environmental Authorisation; (ii) having the Environmental Authorisation reinstated or (iii) having a new environmental authorisation granted
12.1.2
the Appeal being dismissed and the Company subsequently being interdicted from undertaking activities for which the Environmental Authorisation in respect of Phase II is required and which results in Phase II construction activities in respect of the Project being delayed beyond 31 May 2025;
12.1.3
all Phase II construction and development activities undertaken in non-compliance with the Environmental Authorisation; and
12.1.4
the cession and assignment by Renergen of a portion of its shareholders loan claim against the Company to the Company in consideration for the subscription by Renergen, and allotment and issue by the Company to Renergen, of the Renergen Sale Shares.
12.2
Renergen shall have no liability in respect of any claim for indemnification:
12.2.1
which is based on any Loss or liability which is contingent unless and until such contingent Loss or liability becomes an actual Loss or liability; and
12.2.2
for any punitive, special or consequential Loss or expenses including, but not limited to, loss of profit or business.
12.3
The maximum aggregate amount that the Subscriber shall be entitled to recover from Renergen in terms of this clause 12 shall be an amount equal to the aggregate Transaction Price paid by the Subscriber.
13.
No Duplication
13.1
Notwithstanding anything to the contrary contained in this Agreement, where a single fact or circumstance gives rise to multiple causes of action entitling the Subscriber to assert a combination of claims against Renergen or the Company arising out of a combination of warranties, indemnities or undertakings given by Renergen or the Company in terms of this Agreement, the Subscriber shall be limited to recovering the aggregate sum of its actual damages or losses arising in connection with such single fact or circumstance, the intention of the Parties being that, while the Subscriber may assert such combination of claims, the Subscriber may not duplicate the recovery of its damages or losses.
13.2
If the Subscriber successfully claims any amount from Renergen or the Company arising from or in any way related to a breach or alleged breach of warranties, indemnities or undertakings, and is also paid any amount by its insurers arising from the same claim, or a claim based on substantially the same cause of action, the Subscriber shall forthwith reimburse Renergen or the Company, as the case may be, an amount equal to the amount paid to the Subscriber by its insurers as aforesaid.

 

26


 

 

 

 

 

 

Part B Shareholder Terms and Conditions

14.
Conflict with the Amended MOI
14.1
If the provisions of this Agreement conflict with the Amended MOI, the Parties shall, to the maximum extent permissible in law, amend the Amended MOI in order to give effect to the objects, intention and purpose of this Agreement. Pending such amendment, the Shareholders shall exercise all their contractual rights and the rights attaching to their Shares so as to give effect to the provisions of this Agreement to the maximum lawful extent.
14.2
The Parties record and agree that the Amended MOI shall be binding and enforceable between the Shareholders and between each Shareholder and the Company inter se.
14.3
The Shareholders shall exercise their voting rights in favour of any resolution to adopt and/or amend the Amended MOI in accordance with this clause 14.
15.
Application of the Subscription Price

The Company shall, and the Shareholders shall procure (to the extent that it is within their respective powers to do so) that, the Company applies the cash amount of R265,000,000 (two hundred and sixty-five million Rand) that it receives in respect of the Subscription Price to fund Phase II.

16.
Undertaking
16.1
Notwithstanding any other provision of this Agreement, the Company shall, and Renergen shall procure that the Company shall:
16.1.1
at all times comply with the Performance Standards, as applicable to the Business; not engage in any activity on the Exclusion List; and
16.1.2
not enter into discussions or negotiations for the conclusion of any transaction, or conclude any transaction with a person or party listed on the Sanctions List from time to time.
17.
Specially Protected Matters

Notwithstanding anything to the contrary contained in this Agreement, the Company shall not, and the Shareholders undertake to procure (to the extent that it is within their respective powers to do so), that the Company shall not engage in, agree to, perform or undertake any of the matters referred to in Appendix 2, unless the Subscriber’s prior written consent is obtained in relation thereto, such written consent not to be unreasonably withheld or delayed, and the directors’ powers shall be limited accordingly.

18.
Board Decisions

The Company shall not be entitled to implement any of the following actions without a board resolution passed by the majority of the Board and provided that the director/s nominated by the Subscriber have voted in favour of such a resolution:

18.1
any decision not to insure against any such risks as may be recommended by the

Company’s insurance broker and/or advisors;

 

27


 

 

 

 

18.2
the approval of the Company’s annual financial statements; and

 

28


 

 

 

 

 

 

18.3
any change to the Auditors,

it being agreed that the directors nominated by the Subscriber shall, to the extent that they are lawfully able, not act unreasonably in respect of any such resolution.

19.
Funding
19.1
The Parties acknowledge that:
19.1.1
the total funding required by the Company for Phase II is currently expected to be approximately USD 1,170,000,000 (one billion, one hundred and seventy million United States Dollars) which is intended to be financed by the: (i) portion of the Subscription Price contemplated in clause 15; (ii) the Phase II Debt Funding; and (iii) Renergen Contribution; and
19.1.2
the total funding requirement to complete Phase II may exceed the aforementioned amount, depending on factors including, but not limited to, the:

(i) scope of the Project; (ii) exchange rates; (iii) reassessment of capital cost

budgets; and/or (iv) final debt terms (“Final Funding Requirement”).

19.2
Any funding of the difference between the Budgeted Funding Requirement and the Final Funding Requirement required by the Company (the “Funding Difference”) will be procured by the Company and/or funded as follows:
19.2.1
In the first instance, the Board shall use reasonable endeavours to procure that the Funding Difference is funded as far as possible by borrowings from banks and other similar external third-party sources, in each instance on the most favourable terms reasonably obtainable as to interest, repayment and security, but unless the Shareholders otherwise resolve, without allowing any prospective lender a right to participate in the ordinary equity of the Company as a condition of any loan (the “Third Party Debt”).
19.2.2
If the Parties are unable to fund the Funding Difference, or any part thereof, by way of Third Party Debt, either because such funding is not available, or not available on terms commercially acceptable to the Board, Renergen and the Subscriber will be offered the opportunity to fund the requisite amount proportionally in their Prescribed Ratio, by way of subscribing for Ordinary Shares at the Market Value per Ordinary Share in accordance with the provisions of the Amended MOI. Nothing in this Agreement shall prohibit the Subscriber and/or Renergen from taking up the aforementioned Ordinary Shares in proportions other than the Prescribed Ratio if so agreed upon between them.
19.2.3
If the Subscriber elects not to provide its pro rata portion of the Funding Difference, Renergen shall provide the full Funding Difference by way of subscribing for Ordinary Shares in the Company at the Market Value per Ordinary Share in accordance with the provisions of the Amended MOI.
19.3
The Shareholders hereby agree that any dilution of the shareholding in the Company of any Shareholder pursuant to the application of clause 19 shall not constitute unfairly prejudicial, unjust or inequitable conduct.
19.4
If the Final Funding Requirement for Phase II is less than the Budgeted Funding Requirement, the:

 

29


 

 

 

 

 

 

19.4.1
Phase II Debt Funding will not be fully drawn down, unless mutually agreed in writing between the Parties; and
19.4.2
full Renergen Contribution shall, notwithstanding the reduced funding requirement and/or any provision of this Agreement, be made in full.
19.5
Notwithstanding anything to the contrary contained in this Agreement, Renergen undertakes to advance the Renergen Contribution to the Company in the manner contemplated in clause 19.6.2, even if the Final Funding Requirement is less than the Budgeted Funding Requirement.
19.6
Renergen Contribution
19.6.1
Renergen undertakes in favour of the Subscriber and the Company to use its best endeavours to raise, borrow or otherwise procure the funds required for the Renergen Contribution to be provided timeously and when required by the Company for Phase II, and in any event by no later than the scheduled commercial operation date.
19.6.2
Following the receipt of any funds contemplated in clause 19.6.1, Renergen shall contribute such funds to the Company by way of one or more subscriptions for Ordinary Shares at the Market Value per Ordinary Share, until such time as the full Renergen Contribution has been subscribed for.
20.
Voluntary Disposal of Equity
20.1
The Parties agree that the Subscriber (the “Offeror”) shall not be entitled to sell, alienate or otherwise dispose of its Shares unless those Shares (“Sale Equity”) have first been offered in writing (“the Offer”) to Renergen (the “Offeree”) and otherwise subject to the restrictions contained in clause 27.
20.2
The Offer shall:
20.2.1
entitle the Offeree to purchase the Sale Equity;
20.2.2
constitute an irrevocable offer open for acceptance by the Offeree for a period of 30 (thirty) days (the "Offer Period”) following the date of receipt of the Offer by the Offeree.
20.2.3
if an offer has been received by the Offeror from a bona fide third party:
20.2.3.1
be on the terms and conditions so offered, including as to the price and payment terms and if there is no third-party offer be for a cash price, expressed in Rand equal to the Market Value of the Sale Equity, which shall be payable free of exchange against registration of transfer of the Sale Equity to the Offeree and a written cession of the corresponding shareholders' loans to the Offeree, if any;
20.2.3.2
disclose the identity of that third party and the terms of that offer;
20.2.4
not be subject to any other term or condition except that:
20.2.4.1
each Offeree must accept the whole and not part only of the Sale Equity; and

 

30


 

 

 

 

 

 

20.2.4.2
the Offeree may be required to indemnify the Offeror against any claim made against the Offeror by virtue of his liability as surety or guarantor, for any of the obligations of the Company.
20.3
Acceptance by the Offeree in respect of the Offer shall be in writing and delivered to the Offeror.
20.4
If all the Sale Equity has not been taken up in accordance with 20.3, then the Offer shall be deemed to have been rejected in its entirety and the Offeror shall, within 30 (thirty) days after the lapse of the Offer Period, be entitled to sell and transfer all (but not part only) of the Sale Equity to that bona fide third party, but at not less than the price at and on terms which are not more favourable to the buyer than those offered to the Offeror, and the Board shall be obliged to register the transfer of the relevant Shares and record the cession of the relevant shareholders' loan amount, provided the buyer agrees in writing to be bound by this Agreement by executing and delivering a Deed of Adherence.
21.
Involuntary Transfer Provisions
21.1
If Mahlako Energy Fund Disposes or takes any steps to Dispose of its shares in the Subscriber to any person who is not a shareholder in the Subscriber, or an Affiliate of such shareholder (“Subscriber Trigger Event”) then all of the Subscriber’s Equity in the Company (the “Company Forced Sale Equity”), shall be offered for sale to Renergen subject to the provisions of this clause 21
21.2
If any shareholder in the Subscriber (“Investor”), other than Mahlako Energy Fund, Disposes or takes any steps to Dispose of its shares in the Subscriber to any person who is not an Investor, or an Affiliate of any such Investor (“Investor Trigger Event”), then that Investor’s indirect shareholding in the Company attributable to it as a consequence of its shareholding in the Subscriber (“Investor Forced Sale Equity”) shall be offered for sale to Renergen subject to the provisions of this clause 21.
21.3
Upon the occurrence of an Investor Trigger Event and/or a Subscriber Trigger Event (individually and collectively being a “Trigger Event”), the Subscriber shall notify the Company and Renergen in writing (the “Trigger Event Notice”) with such written notification to include the information referred to above and shall procure that the Investor Forced Sale Equity or the Company Forced Equity (either or both as the context may dictate, being the “Forced Sale Equity”) is offered to Renergen at:
21.3.1
the price and on the terms and conditions offered to the Subscriber or the Investor, as the case may be, if there is a third-party offeror; or
21.3.2
the Market Value thereof, payable in cash, and not subject to any further conditions other than the obtaining of any governmental or regulatory approvals that are required, if there is no third-party offeror.
21.4
Renergen shall have a period of 10 (ten) Business Days after receipt of the Forced Sale Notice, or such longer period as may be agreed to in writing between Renergen and the Subscriber or the Investor, as the case may be, to accept the offer of the Forced Sale Equity, which acceptance shall be in writing and delivered to the

 

31


 

 

 

 

 

 

Subscriber, and the Subscriber, or the Investor, as the case may be, shall be obliged to sell the Forced Sale Equity to Renergen and Renergen shall be obliged to pay the Forced Equity Price to the Subscriber, or the Investor, as the case may be, within a period of 10 (ten) Business Days of the date on which the Forced Equity Price is finally determined. Should Renergen fail to accept the offer constituted by the Forced Sale Notice within the relevant 10 (ten) business Day period, the offer shall lapse and the Subscriber and/or Investor, as the case may be, shall be free to Dispose of the relevant Forced Sale Equity as it deems fit.

21.5
If the Subscriber fails to take any action which is necessary to effect transfer of the Forced Sale Equity, the Board may, in the Subscriber's name, transfer the Forced Sale Equity to Renergen and issue to Renergen, where appropriate, certificates and cessions for the Forced Sale Equity in question, and in such event the Board shall hold the purchase consideration as received from Renergen, free of interest, until such time as the Subscriber shall have delivered the original share certificates and any other documents evidencing the transfer of the Forced Sale Equity, whereupon the purchase consideration shall be paid over by the Company to the Subscriber in full.
21.6
Notwithstanding anything to the contrary herein contained, it is acknowledged that the shareholders in the Subscriber shall be entitled to Dispose of all, or any of their shareholding in the Subscriber to their Affiliates and to any other shareholder and/or their respective Affiliates, without triggering the application of this clause 21. The provisions of this clause 21 and clause 22 shall constitute a stipulation for the benefit of all shareholders in the Subscriber and their respective Affiliates from time to time, capable of acceptance in writing at any time.
22.
Lender consents

To the extent that any decision, or the implementation of any decision of the Shareholders pursuant to this Agreement requires lender consent in terms of the Existing Financing Documents and the New Financing Documents, the Shareholders undertake not to implement such decisions without obtaining the prior consent of the relevant lenders in terms of the Existing Financing Documents and the New Financing Documents.

23.
Determination of Market Value of Shares
23.1
When it is required to determine the Market Value of any Shares and Claims (if any), or any portion thereof, such determination shall first be made by written agreement between the relevant parties following consultation between the representatives appointed by each of the relevant parties in writing, and any one of the relevant parties shall invite the other party/ies in writing to a meeting, to be held within 5 (five) days from the date of the written invitation, in an attempt to meet and agree upon the Market Values. The Company shall provide the relevant parties with all such information and documentation as they may reasonably request in order to make such determination
23.2
If the Market Value has not been agreed between the relevant parties within ten Business Days of the aforementioned meeting, such determination shall be made by an Independent Expert.

 

32


 

 

 

 

 

 

23.3
In making such determination, the Independent Expert shall act as an expert and not as an arbitrator and the following provisions shall apply:
23.3.1
subject to the provisions of clause 23.3.3, the Independent Expert shall use such reputable and relevant method of determination and take such steps for such determination as they deem appropriate in the circumstances and may call upon any professional advisors of the Company for such documents and information as the Independent Expert may require for the purposes of such determination; and
23.3.2
the Independent Expert shall have access to such books, documents and other records of the Company, and shall receive and consider such additional information and submissions from the relevant Parties, as they may consider necessary or desirable for making the determination.
23.3.3
The Independent Expert shall:
23.3.3.1
not take into account the fact that the relevant Shares may constitute a minority holding nor that same may constitute a majority or controlling interest in the Company;
23.3.3.2
take into account all such other facts relating to the Business and affairs of the Company as they may consider necessary or desirable, including those which the Independent Expert considers may be taken into account by a bona fide independent purchaser purchasing in an arm’s length transaction; and
23.3.3.3
be entitled to obtain such valuations of the Company’s assets, liabilities, income and expenditure as the Independent Expert deems necessary or desirable.
24.
Provisions to Avoid Conflict Between Clauses 20 and 21
24.1
If, whilst an offer in terms of clause 20 is pending, a Trigger Event, as contemplated in clause 21, occurs, which results in the Equity of the Subscriber under clause 21 being made available for purchase by Renergen, then at the election of Renergen (which election shall be made in writing delivered to the Subscriber and the Board within 48 (forty-eight) hours of Renergen becoming aware of such Trigger Event) the offer made in terms of clause 20 shall be deemed to be withdrawn and instead the provisions of clause 21 shall apply.
24.2
For so long as the Equity of the Subscriber is available for purchase by Renergen in terms of clause 21, such Equity shall not be offered for sale in terms of clause 20.
25.
Transfers to Affiliates
25.1
Subject to the remaining provisions of this clause 25 and the provisions of clause 28, the Shareholders shall be entitled freely to Dispose of all, or any of its Equity to an Affiliate of such Shareholder, without being required to comply with the provisions of clause 20 or any equivalent provisions in the Amended MOI.
25.2
No Equity may be disposed of in terms of clause 25.1 unless, prior to such disposal, the disposing Shareholder notifies the Board of such intended transfer and provides the Board with all information reasonably required by the Board to satisfy itself that the proposed holder or transferee is an Affiliate, and that the Affiliate in writing

 

33


 

 

 

 

undertakes to the other Shareholders, to be bound by the provisions of this

 

34


 

 

 

 

 

 

Agreement to the extent to which they impose any obligations on such Permitted Transferee. The Board shall notify the Lenders of any such intended transfer of which it becomes aware and provide the Lenders with copies of the aforesaid written undertaking.

26.
Distributions
26.1
Subject to the provisions of the Act, and particularly section 46, and subject to the provisions of clause 15 (read with Appendix 2) to the extent applicable, the Amended MOI the Company:
26.1.1
shall subject to the Board's fiduciary duties, endeavor to maximize distributions to Shareholders;
26.1.2
may make a proposed distribution if such distribution is pursuant to an existing legal obligation of the Company, or a court order; or
26.1.3
is authorised by resolution of the Board.
26.2
No distribution shall bear interest against the Company, except as otherwise provided under the conditions of issue of the Shares in respect of which such distribution is payable.
26.3
Distributions may be declared either free of or subject to the deduction of income tax and any other tax or duty in respect of which the Company may be chargeable, or which the Company may be required by law to withhold.
26.4
The Directors may from time to time declare and pay to the Shareholders such interim distributions as the Directors consider to be appropriate.
26.5
All unclaimed distributions may be invested or otherwise made use of by the Board for the benefit of the Company until claimed by the person entitled to the distribution at any time before that distribution has been declared forfeit in terms of clause 26.6.
26.6
Distributions unclaimed for a period of not less than three years from the date on which such distributions became payable by the Company may be declared forfeited by the board for the benefit of the Company, or if so resolved by the board unclaimed distributions may be settled by the Company upon trustees to be held in trust for the benefit of the relevant Shareholders, after which the liability of the Company in respect of those distributions will be extinguished.
26.7
Any distribution, interest or other sum payable in cash to the holder of a Share may be paid by electronic funds transfer, free of set-off, in the currency of South Africa to the bank account nominated by such Shareholder, in writing, and verified by means of a copy of a bank statement with an original bank stamp or by such other means as may be acceptable to the Directors and, in the case of joint holders, to the bank account so nominated and verified of the holder whose name appears first in the Securities Register.
26.8
A distribution may also be paid in any other way determined by the Directors, and if the directives of the Directors in that regard are complied with, the Company shall not be liable for any loss or damage which a Shareholder may suffer as a result thereof.

 

35


 

 

 

 

 

 

26.9
A holder or any one of two or more joint holders, or his or their agent duly appointed in writing, may give valid receipts for any distributions or other monies paid in respect of a Share held by such holder or joint holders.
26.10
Where any difficulty arises in regard to such distribution, the Directors may settle that difficulty as they think expedient, and in particular may fix the value that shall be placed on such specific assets on distribution.
26.11
The Directors may —
26.11.1
determine that cash payments shall be made to any Shareholder on the basis of the value so fixed in order to secure equality of distribution; and
26.11.2
vest any such assets in trustees upon such trusts for the benefit of the persons entitled to the distribution as the Directors deem expedient.
27.
Put Option
27.1
Renergen hereby grants to the Subscriber the right and option to sell to Renergen and to require Renergen to purchase all of its Equity (the “Put Equity”) on the terms in this clause 27 (the “Put Option”) on the occurrence of a Put Option Event.
27.2
It is specifically agreed by the Parties that the exercise of the Put Option will be subject to and in compliance with the relevant provisions of the JSE Listings Requirements, including the need to obtain prior shareholder approval should the exercise of the Put Option comprise a Category 1 transaction (namely if the Put Option exceeds 49.9% of Renergen’s market capitalization for Alt X listed companies) at the time of exercise in terms of the JSE Listings Requirements. For the avoidance of doubt, it is acknowledged by the Parties that the grant of the Put Option shall not require approval in terms of the JSE Listings Requirements.
27.3
In the event of the occurrence of Put Option Event and the Subscriber exercises, or notifies Renergen in writing that it wishes to exercise the Put Option, Renergen shall be solely responsible to procure compliance with the JSE Listing Requirements applicable to Renergen including without limitation any approvals or consents that may be required in order for Renergen to perform its obligations in terms of this clause 27. The Subscriber shall provide Renergen, at Renergen's cost, with all assistance as may reasonably required by Renergen, without unreasonable delay, in order for Renergen to comply with its obligations and/or secure the necessary consent and/or approval in terms of the JSE Listings Requirements for the performance of its obligations in terms of this clause 27.
27.4
Renergen hereby indemnifies the Subscriber against all and any Loss suffered by the Subscriber, as a result of or attributable to a failure by Renergen to comply with its obligations, and/or secure the necessary consent and/or approval in terms of the JSE Listings Requirements in terms of clause Error! Reference source not found..
27.5
In the event that the Subscriber is unable to timeously exercise the Put Option within the Put Option Period, or such longer period as may be agreed upon between the Parties in writing, and/or Renergen is fails to perform its obligations in terms of this clause 27 for any reason whatsoever, including as a consequence of Renergen failing, for any reason whatsoever, to procure the relevant compliance, consent and/or

 

36


 

 

 

 

approval within the Put Option Period, Renergen shall pay the Subscriber an

 

37


 

 

 

 

 

 

amount, as agreed liquidated damages, equal to the relevant Put Equity Price (the “Indemnified Amount”), which shall be payable to the Subscriber by Renergen not later than 90 (ninety) days following the date of delivery by the Subscriber of the Put Option Notice. Following timeous payment of the Indemnified Amount in full, the Subscriber agrees to the sell to Renergen and Renergen agrees to purchase from the Subscriber, the Put Equity for a price of R1 (One Rand).

27.6
A Put Option Event shall have occurred if:
27.6.1
Renergen or the Company commits a:
27.6.1.1
breach of any Warranty given in terms of this Agreement and the breach (i) cannot be remedied adequately by specific performance or by the payment of damages, or (ii) is capable of being remedied by specific performance and it is not remedied within fifteen Business Days after Renergen or the Company receives written notice to remedy the breach;
27.6.1.2
save for any breach of any Warranty, a material breach of the Transaction Documents and fails to remedy that breach within 10 (ten) Business days of the other Parties providing written notice thereof to Renergen or the Company, as the case may be;
27.6.2
the Company fails to comply with any of the Performance Standards and fails to remedy that non-compliance within 10 (ten) Business Days of the Subscriber providing written notice thereof to the Company;
27.6.3
the Company engages in any activity on the Exclusion List and fails to cease engaging in such activity within 10 (ten) Business Days of the Subscriber providing written notice thereof to the Company;
27.6.4
the Company enters into discussions or negotiations for the conclusion of any transaction with a person or party listed on the Sanctions List and fails to terminate such discussions or negotiations within 10 (ten) Business Days of the Subscriber providing written notice thereof to the Company, and/or the Company enters into any transaction or dealings with any person or party listed on the Sanctions List;
27.6.5
the Appeal is upheld;
27.6.6
the commencement of Phase II construction of the Project is delayed beyond 31 May 2025 as a result of the Appeal being (a) upheld or any subsequent appeal or review applications in connection with, or relating to, the Environmental Authorisation or (b) dismissed and the Company subsequently being interdicted from undertaking activities for which the Environmental Authorisation in respect of Phase II is required;
27.6.7
Renergen ceases to hold 50% or more of the issued Shares of the Company.
27.7
Should any Party become aware of the occurrence of a Put Option Event, it shall

inform the other Parties thereof in writing (the “Event Notice”).

27.8
The Subscriber may exercise (or indicate its intention, subject to clause 27.2, to exercise) the Put Option by written notice to Renergen (the “Put Option Notice”) at any time during the period of 30 (thirty) days commencing on the date on which

 

38


 

 

 

 

 

 

the Subscriber delivers or received the Event Notice, as the case may be (the “Put Option Period”).

27.9
For the avoidance of doubt, if the Put Option is not exercised during the Put Option Period, it shall lapse. For the avoidance of doubt, nothing in this Agreement shall be construed as preventing or prohibiting the exercise of the Put Option upon the happening of each and any Put Option Event.
27.10
A Put Option Notice shall constitute a legally binding contract between the Subscriber and Renergen for the sale and purchase of the Put Equity specified in the Put Exercise Notice, free from any claim, charge, lien or encumbrance, and with all rights attached thereto at the date of service of the Put Option Notice.
27.11
The Put Option Notice must contain details of the price payable by Renergen to the Subscriber for the Put Equity which shall:
27.11.1
in the circumstances contemplated in clause 27.6.5 be an amount equal to the higher of the: (a) the aggregate of (i) the Transaction Price plus the face value of any Claims (if any), (ii) an amount equal to 3.5% (three and a half percent) of the Transaction Price (the “Transaction Price Additional Cost”) and (iii) the costs of the relevant service providers for the preparation of the Due Diligence Reports as evidenced by the invoices of such service providers addressed to the Subscriber in respect of the preparation of such Due Diligence Reports and furnished by the Subscriber to Renergen for verification (the “Due Diligence Cost”) and (b) the aggregate of (i) the Market Value of the Put Equity as determined in accordance with clause 22, (ii) the Transaction Price Additional Cost (iii) the Due Diligence Cost; and
27.11.2
in all other circumstances, be an amount equal to the aggregate of (i) the Transaction Price plus the face value of any Claims (if any); (ii) the Transaction Price Additional Cost; and (iii) the Due Diligence Cost,

(the “Put Equity Price”), provided in all instances that the Put Equity Price shall not exceed an amount equal to 49.9% of Renergen’s market capitalization.

27.12
Within 90 (ninety) days following the receipt of the Put Option Notice or the determination of the Put Equity Price (if applicable), the Subscriber shall meet with Renergen at the offices of the Company to give effect to the sale and transfer of the Put Equity.
27.13
At the meeting as aforesaid, the:
27.13.1
original certificate relating to the Subscriber’s Shares shall be surrendered in order that same may be cancelled, alternatively, should such certificates have been lost or destroyed, the Subscriber shall deliver an indemnity in favour of the Company;
27.13.2
Subscriber and Renergen shall sign all such documents and do all such things to transfer the Put Equity to Renergen, and the Subscriber irrevocably and in rem suam appoints the Company or (or its successor in title) as its attorney and agent to do all such things as may be necessary to give effect to such transfer; and
27.13.3
Put Equity Price shall be paid by Renergen to the Subscriber in immediately available funds by bank automated transfer to such bank account as the Subscriber

 

39


 

 

 

 

shall specify by written notice to Renergen.

 

40


 

 

 

 

 

 

27.14
The Parties acknowledge and agree that:
27.14.1
there are a range of transaction structures that could be used to implement the Put Option including for the avoidance of doubt, a sale of Shares or a subscription by Renergen for new Ordinary Shares followed by a repurchase of the Put Equity; and
27.14.2
the provisions of this Agreement shall not prevent the investigation and application of alternative structures for implementation of the Put Option,

accordingly, if the legal, financial and/or tax advice obtained by the Subscriber suggests a particular structure for implementing the Put Option which could be preferable and/or beneficial for the Subscriber, the Parties agree to investigate the use of such a structure in good faith.

28.
Restrictions on Transfer
28.1
No Shareholders may dispose of its Shares without disposing of a corresponding portion of its Claims, if any.
28.2
A Shareholder shall not be permitted to dispose of its shares in the Company to any third-party purchaser unless it has first obtained the other Shareholder's written consent in respect of the identity of such third-party purchaser and such consent shall not be unreasonably withheld, delayed or conditioned..
28.3
Any transfer or issue of Shares to any person who is not already a Shareholder shall be subject to the condition that the transferee signs the Deed of Adherence, substantially in the form contained in Appendix 1 hereto, to be bound to all the terms and conditions of this Agreement. Upon such Deed of Adherence being so signed, such transferee shall in relation to this Agreement, be vested with all the rights and obligations of a Shareholder as recorded in this Agreement.
28.4
The Board shall not register the transfer of Shares to any person in the share register of the Company unless such transfer is pursuant to a Disposal which is permitted, or not precluded in terms of this Agreement, pursuant to the person signing a Deed of Adherence, and which is effected in a manner that does not breach, or disregard the Existing Financing Documents and the New Financing Documents as well as any Shareholder’s rights in terms of this Agreement.
29.
Tag along
29.1
If Renergen receives an offer in respect of so many Shares (and a corresponding portion of Renergen's Claims, if any) which constitutes not less than 41% (forty-one percent) of all of its Equity ("Offer Equity") whether in terms of one or a series of related transactions (“Recipient Offer”) from a third party dealing bona fide and at arm’s length (“Third Party”), which it wishes to accept, Renergen shall forthwith upon receipt of such offer, deliver a copy of the Recipient Offer to the Subscriber. The Company shall notify the Lenders upon receipt of the Recipient Offer.
29.2
Upon receipt of the Recipient Offer, the Subscriber shall be entitled to indicate, in writing (“Tag Along Notice”), that it wishes to participate in its Prescribed Ratio, in the Recipient Offer, on the basis that the Third Party shall be obliged to purchase the

 

41


 

 

 

 

relevant Offer Equity from Renergen and the Subscriber in the Prescribed Ratio.

 

42


 

 

 

 

 

 

29.3
If the Subscriber delivers the Tag Along Notice to Renergen:
29.3.1
Renergen must procure that the Third Party makes an offer to the Subscriber on the basis set forth in clause 29.2 mutatis mutandis on the same terms as the Recipient Offer; and
29.3.2
Renergen may not accept the Recipient Offer until it has procured compliance with clause 29.3.1.
30.
Non-compete Undertakings
30.1
The Shareholders acknowledge that they will, over a period of time, by virtue of their shareholding in the Company, have access to substantial confidential information and trade secrets in relation to the Business and the business carried on by its Affiliates, which constitute a valuable intellectual capital of the Company, all of which shall be referred to as “intellectual property”.
30.2
In protection of the Business and the intellectual property, the Subscriber agrees that it is reasonable for it to be restricted, for the duration of the Restraint Period, from having an interest in any entity, the business of which is the production of Helium and/or Liquified Natural Gas in South Africa.
30.3
In protection of the Business and the intellectual property, Renergen agrees that for the duration of the Restraint Period it is reasonable that it will not, and it will procure that its Affiliates (other than the Company) do not, become associated with or interested in any manner whatsoever in any entity carrying on an activity or business which competes with the Business or the Company.
30.4
The Subscriber agrees that it shall not and Renergen agrees that it shall not and shall procure that its Affiliates shall not, for the duration of the Restraint Period:
30.4.1
directly or indirectly engage in any manner whatsoever (other than in the ordinary course of business) with the customers and suppliers of the Company which does or may in any manner materially damage or undermine the relationship of the Company with such customers and suppliers, including causing such customer to refuse to transact with the Company or to transact on materially different conditions than it would otherwise have done;
30.4.2
directly or indirectly use for its own benefit (other than in its capacity as a Shareholder in the Company) or the benefit of any other person or entity, any proprietary information and shall not disclose any proprietary information, other than to those persons or entities connected with the Company who are required to know or have that proprietary information;
30.4.3
persuade, induce, encourage or procure any employee of the Company or any person who was an employee of the Company during the preceding 12 (twelve) months to leave the employ of the Company.
30.5
The Subscriber and Renergen acknowledge and agree that:
30.5.1
the restraints imposed upon them in terms of this clause 30 are fair and reasonable as to subject matter, geographical territory and period and are necessary for the protection of the interests of the Company; and

 

43


 

 

 

 

 

 

30.5.2
each restraint contained in this clause 30 is separate and divisible from every other restraint in this clause, so that if any one of the restraints is or becomes unenforceable for any reason, that restraint will be severable and will not affect the validity of any of the other restraints contained in this clause 30. Insofar as the restraints are considered by the Parties to be reasonable in all the circumstances, the Parties agree that if the restraints, taken together, are adjudged to go beyond what is reasonable in all these circumstances but would be adjudged reasonable if part or parts of the wording of the restraints were deleted, the restraints shall apply with such part or parts of the wording deleted.

Part C General

31.
Confidentiality
31.1
All communications between the Shareholders and/or any of them, and all information and other materials supplied to or received by any of them from the others which relate in any way to this Agreement shall be kept confidential by all the Parties unless or until the relevant Party can reasonably demonstrate that:
31.1.1
any such communication, information or material is, or part of it is, in the public domain through no fault of its own; or
31.1.2
any such communication, information or material has been lawfully obtained from any third party; or
31.1.3
the information is already lawfully known to the relevant Party at the time that the Party receives such information; or
31.1.4
the relevant Party is obliged by law to disclose such information or make an announcement as required by any regulatory or governmental authority of competent jurisdiction (including any applicable stock exchange) provided that, to the extent it is legally permitted to do so, the Party making such announcement shall give the other Parties as much notice of the announcement as possible, and take into account the reasonable requests of the other Parties in relation to the content of the announcement; or
31.1.5
the relevant Party is obliged, in pursuance of his employment duties, to disclose such information,

whereupon this obligation in respect of that information shall cease.

31.2
The Shareholders shall use all reasonable endeavours to procure the observance of these restrictions and shall take all reasonable steps to minimise the risk of disclosure of Confidential Information by ensuring that only they themselves and such of their employees and directors whose duties will require them to possess any of such information shall have access to such information, and will be instructed to treat the same as confidential. The provisions of this clause 31 must not be construed as preventing either party from making any necessary or reasonable disclosures to regulators, in which case such party shall consult with the Board before making such public disclosure or to its direct or indirect investors subject to the prior written approval of the Company. The approval of the Company in terms hereof shall not be unreasonably withheld, provided that the Company shall be deemed not to be acting

 

44


 

 

 

 

 

 

unreasonably if disclosure is intended to be made to a person with any direct or indirect interest in or involvement with any business in competition with the business of the Company.

31.3
The obligation contained in this clause 31 shall endure, even after the termination of this Agreement, without limit in point of time except and until such Confidential Information falls within any of the provisions of clauses 31.1.1 to 31.1.5.
31.4
Each Shareholder on ceasing to be a Shareholder shall hand over to the Company all correspondence, budgets, schedules, documents and other records belonging to or relating to the Business of the Company and undertakes not to keep any copies (electronic or otherwise) thereof save as is required by law or, as may be required in order to discharge its reporting or record-keeping obligations to its direct or indirect investors subject to the prior written approval of the Company. The approval of the Company in terms hereof shall not be unreasonably withheld, provided that the Company shall be deemed not to be acting unreasonably if disclosure is intended to be made to a person with any direct or indirect interest in or involvement with any business in competition with the business of the Company.
32.
Support
32.1
Subject to the provisions of clause 32.2 the Shareholders undertake at all times to do such things, perform all such actions and take all such steps (including, in particular, the exercise of their voting rights in the Company) and to procure the doing of all such things, the performance of all such actions and the taking of all such steps as may be open to them and necessary for or incidental to the putting into effect or maintenance of the terms, conditions and/or import of this Agreement.
32.2
Where any particular provision contained in this Agreement imposes on any one or other Party the obligation (to the exclusion of the other Parties) to do any act, matter or thing, it shall not be the obligation of all the Shareholders (by the inclusion of clause 32.1) to procure the doing of such act, matter or thing, but it shall only be the obligation of the Shareholder who is specifically directed thereto. For the sake of clarity therefore, unless a Shareholder has expressly bound itself to do so, whether in terms of the provisions of this Agreement or otherwise, no Shareholder shall be obliged to provide any guarantee, suretyship and/or indemnity to any third party in respect of the obligations of the Company.
33.
Good Faith
33.1
The Shareholders shall owe each other a duty of good faith in all their dealings with one another as shareholders of the Company.
33.2
The provisions of clause 33.1 shall not be construed or interpreted as giving rise to any partnership or quasi-partnership relationship between the Shareholders, or as constituting any Shareholder as the partner, agent or representative of any other Shareholder or to create any trust for any purpose whatsoever.

 

45


 

 

 

 

 

 

34.
Binding the Company
34.1
None of the Parties other than the Company will have the ability, power or capacity independently to bind the Company in any way, save to the extent specifically provided for in this Agreement.
34.2
Save as otherwise specifically provided for or contemplated in this Agreement, each of the Parties other than the Company, respectively warrants to all the other Parties (including the Company) that it will not approach third parties independently concerning any matter dealt with in this Agreement or the operations of the Company, or seek to bind the Company in any way and each of the Parties other than the Company respectively undertakes to all the other Parties (including the Company) not to hold itself out at any time to any third party as having the authority on behalf of the Company to approach third parties independently concerning any matter dealt with in this Agreement or the operations of the Company or to bind the Company in any way, in any manner whatsoever.
35.
Breach
35.1
Renergen shall be entitled to claim specific performance or to cancel this Agreement summarily by giving written notice to that effect to the Subscriber, if the Subscriber fails to pay on the due date, any amount that becomes payable in terms of this Agreement and remains in default for 3 (three) Business Days after receiving written notice to remedy the default.
35.2
Should the Subscriber commit any other breach of this Agreement prior to Closing, neither Renergen, nor the Company, shall be entitled to cancel this Agreement unless (i) the breach is material and cannot be remedied adequately by the payment of damages and, being such a breach, it is not remedied within ten (10) Business Days of receipt of written notice to that effect, or (ii) is not capable of being remedied by specific performance or, if capable of being so remedied, is not so remedied within three Business Days after the Subscriber receives written notice to remedy the breach.
35.3
The Subscriber shall be entitled to claim specific performance or to cancel this Agreement summarily by giving written notice to that effect to Renergen and the Company, if Renergen or the Company fail to comply with any of their obligations in terms of clause 7.3 and remain in default for three Business Days after receiving written notice to remedy the default.
35.4
Should Renergen or the Company commit any other breach of this Agreement the Subscriber shall not be entitled to cancel this Agreement unless the breach is material and cannot be remedied adequately by the payment of damages and, being such a breach, it is not remedied, or is not capable of being remedied by specific performance prior to the earlier of (i) fifteen Business Days after Renergen or the Company receives written notice to remedy the breach.
35.5
The remedies of each Party in terms of this clause 35 shall not be exhaustive and shall be in addition and without prejudice to any other remedies it has under Applicable Law under or in consequence of this Agreement.

 

46


 

 

 

 

 

 

36.
Disputes

Save in respect of those provisions of this Agreement which provide for their own remedies which would be incompatible with arbitration, a dispute which arises in regard to:

36.1
the interpretation of; or
36.2
the unconditionality of; or
36.3
the carrying into effect of; or
36.4
any of the Parties’ rights and obligations arising from; or
36.5
the termination or purported termination of or arising from the termination of; or
36.6
the rectification or proposed rectification of,

this Agreement, or out of or pursuant to this Agreement (other than where an interdict is sought or urgent relief may be obtained from a court of competent jurisdiction) shall be submitted to and decided by arbitration in accordance with the Arbitration Rules, by an arbitrator or arbitrators appointed by AFSA.

37.
Notices and Legal Process
37.1
Each Party chooses this address for all purposes under this Agreement (“Chosen Address”), whether for serving court process or documents, giving any notice, or making any other communications of whatsoever nature and for whatsoever purpose under this Agreement:

Mahlako Gas Energy Proprietary Limited

Address: 345 Rivonia Road,

Block A, 1st floor, Rivonia, 2191

 

Email:

Renergen Limited

Address: 25 Minerva Ave

Glenadrienne Sandton, 2196

 

Email:

Tetra4 Proprietary Limited

Address: 25 Minerva Ave

Glenadrienne Sandton, 2196

 

Email:

37.2
Any notice required or permitted under this Agreement is valid only if in writing.

 

47


 

 

 

 

 

 

37.3
Any Party may by notice to the other Parties change its Chosen Address to another physical address in South Africa and that change takes effect on the seventh day after the date of receipt by the Party who last receives the notice.
37.4
Any notice delivered by hand to the Chosen Address of a Party before 17h00 is deemed to have been received on the date of delivery.
37.5
Despite anything to the contrary in this Agreement, a written notice actually received by a Party, including a notice sent by email, is an adequate notice to it even though not sent or delivered to the physical address above.
38.
Interpretation
38.1
Clause and paragraph headings are for purposes of reference only and shall not be used in interpretation.
38.2
Unless the context clearly indicates a contrary intention, any word connoting:
38.2.1
any gender includes the other two genders;
38.2.2
the singular includes the plural and vice versa;
38.2.3
natural persons include juristic and artificial persons and vice versa;
38.2.4
insolvency includes provisional or final sequestration, liquidation or Business Rescue.
38.3
A reference to days (as opposed to Business Days) shall mean calendar days.
38.4
A reference to a Business Day shall mean any day other than a Saturday, Sunday, or public holiday in South Africa.
38.5
When any number of days, or Business Days, is prescribed, such number shall exclude the first and include the last, unless, in the case of days, the last day falls on a Saturday, Sunday, or a public holiday in South Africa, in which case the last day shall be the next succeeding Business Day.
38.6
A reference to an enactment is a reference to that enactment as at the date of signature of this Agreement (being the date of the last signature to this Agreement) and as amended or re-enacted from time to time.
38.7
Unless expressly defined, a reference to ‘Parties’ means the signatories to this Agreement, and “Party” is construed accordingly.
38.8
The rule of interpretation that a written agreement shall be interpreted against the party responsible for the drafting or preparation of that agreement shall not apply.
38.9
If any provision in a definition is a substantive provision conferring rights or imposing obligations on any Party, notwithstanding that it is only in the definition clause, effect shall be given to it as if it were a substantive provision in the body of the Agreement.
38.10
The eiusdem generis rule shall not apply and accordingly, whenever a provision is followed by the word “including” and specific examples, such examples shall not be construed so as to limit the ambit of the provision concerned.

 

48


 

 

 

 

 

 

38.11
Where any term is defined within the context of any particular clause in this Agreement, then, unless it is clear from the clause in question that the term so defined has limited application to the relevant clause, the term so defined shall bear the meaning ascribed to it for all purposes in terms of this Agreement, notwithstanding that that term has not been defined in the definition clause.
39.
General and miscellaneous
39.1
Negotiated terms

The Parties agree that the terms and conditions of this Agreement are the results of negotiations between them and that this Agreement shall not be construed in favour of or against any Party by reason of the extent to which any Party or its professional advisors participated in the preparation of this Agreement.

39.2
Sole record of agreement

This Agreement constitutes the sole record of the agreement between the Parties with regard to the subject matter hereof. No Party shall be bound by any express or implied term, representation, warranty, promise or the like not recorded herein.

39.3
Severability

Each paragraph, clause, term and provision of this Agreement shall be considered severable and if, for any reason, any part of this Agreement is held to be invalid, contrary to, or in conflict with any applicable present or future law or regulation or in terms of a final, binding judgment issued by any court, it shall not impair the operation of, or have any effect upon such other portions of this Agreement as may otherwise remain valid or intelligible, which shall continue to give full force and effect and bind the Parties hereto.

39.4
Counterparts

This Agreement may be executed in two or more counterparts, each of which shall be deemed to be an original and all of which shall be deemed to constitute the same Agreement.

39.5
No amendments except in writing

No addition to, variation or agreed cancellation of, or waiver of any right under this Agreement shall be of any force or effect unless recorded in writing and signed in manuscript by or on behalf of the Parties, and no form of electronic signature or electronic communication or exchange shall constitute compliance with this requirement.

39.6
Cession

Except as specifically contemplated in this Agreement, no Party may cede any rights nor delegate any obligations in terms of this Agreement without the prior written consent of all of the other Parties.

39.7
Waivers

No relaxation or indulgence which any Party may grant to any other shall constitute a waiver of the rights of that Party and shall not preclude that Party from exercising

 

49


 

 

 

 

any rights which may have arisen in the past or which might arise in future.

 

50


 

 

 

 

 

 

39.8
Absence of cancellation as remedy

The provisions of this Agreement shall be binding upon the successors-in-title and assigns of the Parties. This includes any successor to any Shares in the Company transferred in accordance with the provisions of this Agreement and the Amended MOI.

39.9
Survival of obligations

Any provision of this Agreement which contemplates performance or observance subsequent to any termination or expiration of this Agreement shall survive any termination or expiration of this Agreement and continue in full force and effect.

39.10
Governing law

This Agreement and all matters or disputes arising therefrom or incidental hereto shall be governed and construed in accordance with the laws of South Africa

39.11
Costs
39.11.1
Each Party shall bear its own costs incidental to the negotiation, drafting and execution of this Agreement.
39.11.2
Any costs, including attorney and own client costs, incurred by a Party arising out of the breach by any other Party of any of the provisions of this Agreement shall be borne by the Party in breach
39.12
Approvals and consents

An approval or consent given by a Party under this Agreement shall only be valid if in writing and shall not relieve the other Party or Parties from responsibility for complying with the requirements of this Agreement nor shall it be construed as a waiver of any rights under this Agreement except as and to the extent otherwise expressly provided in such approval or consent, or elsewhere in this Agreement.

 

 

 

 

 

51


 

 

 

 

Signed at Paarl, Western Cape on 23 December 2023

 

Mahlako Gas Energy Proprietary Limited

 

Who warrants authority

Signed at

Austin, TX

on 22 December 2023

 

 

52


 

 

 

 

 

 

__________________Renergen Limited

 

Who warrants authority

Signed at

Laingsburg, western CAPE

on 22 DECEMBER 2023

 

 

 

 

 

 

 

53


 

 

 

 

Tetra4 Proprietary Limited

 

Who warrants authority

 

 

54


 

 

 

 

 

 

 

 

Appendix 2

 

 

Specially Protected Matters

 

All capitalised terms used herein shall bear the meaning ascribed thereto in the Shareholders Agreement. .

1.
any all matters which require special resolutions under the Companies Act;
2.
any changes to the MOI (including, but not limited to, the creation of new classes of Shares and Securities);
3.
any changes to the nature or purpose of the business of the Company;
4.
any expansion of the business of the Company and/or extension of its operational activities beyond the currently licensed areas of Virginia in the province of the Free State, and Evander, in the province of Mpumalanga, in South Africa, save for the entering into agreements to acquire raw gas from neighboring right holders;
5.
any change in the corporate structure of the Company;
6.
any material divestments and material disposals, including any disposal which requires the approval of a special resolution of the shareholders in terms of section 112 of the Act (i.e. a disposal of all or the greater part of the assets or undertaking of the Company) and the entering into of any material contract outside of the ordinary business of the Company;
7.
the borrowing by the Company of any amount other than in terms of the Phase II Debt Funding documents, in excess of USD750,000,000 (seven hundred and fifty million United Stated Dollars) (in Base Date Prices) and the refinancing of any phase I debt;
8.
contracts between related parties, including but not limited to, outsourcing and subcontracting contracts, and contracts between related parties and their Affiliates and the Company. In addition, any Shareholder will be able to request a "value for money" assessment of the related party transaction by an independent expert and an unfavorable assessment in respect of any such related party transactions will enable the relevant shareholder to prevent the contract from being executed;
9.
any of the following in respect of the Company: business rescue, liquidation, winding up or deregistration;
10.
any profit-sharing arrangement with, or share incentive or other incentive scheme for directors or employees;
11.
the encumbrance of any material assets of the Company, other than in terms of the financing agreements;
12.
the cessation, suspension or abandonment of the business conducted by the Company;
13.
any listing of any shares or Securities issued by the Company on any stock exchange;
14.
the granting of loans or the giving of any guarantees or other security by the Company, other than guarantees and/or security as contemplated under the Phase II Debt Funding;

 

62


 

 

 

 

 

 

15.
the adoption of or any change of the dividend policy of the Company;
16.
any amalgamation, merger or consolidation with, or any assumption of liabilities of, any other entity or person;
17.
any variation of any rights attaching to any Shares or other Securities in the capital of the Company;
18.
the creation of new classes of shares or Securities; the allotment or issue of any shares, debentures or any other Securities convertible into shares in the Company or any options or other rights to subscribe for or acquire any shares or Securities in the Company. Where the Company issues new shares or instruments which may be converted into shares, the value at which such shares are issued shall be Market Value.
19.
any distribution by the Company to its Shareholders, or any repayment of loans made to the Company by its Shareholders, which is not made and paid in proportion to their shareholding, or any change in the priority of repayment of any shareholder loan relative to distribution by the Company;
20.
the initiation or settlement by the Company of any material litigation, arbitration or other equivalent proceedings with any governmental authority or government-owned entity that is:

(i) related to any permit or other governmental approvals necessary for the Project or the conduct of the Company’s business; (ii) related to environmental matters or matters related to the Prevention and Combating of Corrupt Activities Act; (iii) related to the project documents; or (iv) equals or exceeds an amount of R25,000,000 (twenty-five million Rand);

21.
the institution of any material legal claims, processes or proceedings in respect of any governmental authority;
22.
the institution of any tax claims, processes or proceedings other than in the ordinary course of business and in excess of R100,000,000 (one hundred million Rand);
23.
any material capital expenditure by the Company which is not provided for in the annual budget or business plan and in excess of 20% of the aggregate annual budgeted capital expenditure;
24.
any material fixed operational expenditure by the Company, which is not provided for in the annual budget or business plan and is in excess of 20% of the aggregate annual budgeted operational expenditure; and
25.
the incorporation or acquisition of any Subsidiary (as such term is defined in the Companies Act) by the Company.

 

63


 

 

 

 

 

 

 

Appendix 4

 

 

Amended MOI

 

Memorandum of Incorporation

 

 

of

 

Tetra4 Proprietary Limited

 

 

a private company

 

 


 

Subscription and Shareholders’ Agreement

 

 

 


 

EXECUTION

 

 


 

 

 

 

 

 

 

 

Contents

1.
Definitions and interpretation 67
2.
Conflict with the Shareholders Agreement 73
3.
Securities of the company 73
4.
Shareholders 76
5.
Shareholders Meetings 80
6.
Directors and officers 84
7.
General Provisions 92

Appendix 1 96

Share Terms 96

 


 

 

 

Memorandum of Incorporation

of

Tetra4 Proprietary Limited (Registration Number 2005/012157/07)

1.
Definitions and interpretation
1.1
In this Memorandum of Incorporation:
1.1.1
a reference to a section number refers to a section of the Act;
1.1.2
unless inconsistent with the context, words that are defined in the Act bear the same meaning in this Memorandum of Incorporation;
1.1.3
the headings to the clauses are used for reference purposes only and do not affect the terms of this Memorandum of Incorporation.
1.2
Capitalised terms used herein shall, unless the contrary is indicated, bear the meanings assigned to them in the Shareholders Agreement.
1.3
Unless inconsistent with the context, the words and expressions set forth below shall bear the following meanings and cognate expressions shall bear corresponding meanings:
1.3.1
A Ordinary Share means the ‘Class A’ ordinary shares of no par value in the share capital of the Company, having the preferences, rights, limitations and other terms set out in Part B of Appendix 1;
1.3.2
A Ordinary Shareholder means the holder of an A Ordinary Share from time to time;
1.3.3
Act means the Companies Act, 2008, as amended, together with any regulations published in terms of it;
1.3.4
Auditors means the auditors of the Company from time to time;
1.3.5
Board means the board of directors of the Company from time to time;
1.3.6
Commission means the Companies and Intellectual Property Commission established by section 185 of the Act;
1.3.7
Company means Tetra4 Proprietary Limited (registration number 2005/012157/07), a private company duly incorporated in accordance with the laws of South Africa;
1.3.8
Conversion Date means 31 December 2025;
1.3.9
Conversion Shares means, in respect of all of the A Ordinary Shares held by the A Ordinary Shareholder at the Conversion Date, that number of Ordinary Shares as constitutes 5.5% (five point five percent) of the aggregate issued Ordinary Shares immediately after the issue of the Conversion Shares;
1.3.10
Director means a member of the board of the Company and his or her alternate, if any;

 

67


 

 

 

1.3.11
Exercisable Votes means the aggregate number of votes exercisable by the holders of Ordinary Shares and A Ordinary Shares collectively on any resolution of the Shareholders;
1.3.12
Final Discharge Date means the date on which all obligations that are outstanding under the Senior Financing Documents have been irrevocably and unconditionally paid in full and in cash and the Lenders are under no obligation (whether actual or contingent) to make any advances or provide any other financial payments to the Company under the Senior Financing Documents;
1.3.13
Lenders means the United States International Development Finance Corporation (“DFC”) and the Industrial Development Corporation of South Africa Limited (“IDC”) under the Existing Financing Documents, and DFC; the Standard Bank of South Africa (“SBSA”) including inter alia any agent, and/or party that becomes a lender, from time to time, under the New Financing Documents;
1.3.14
MGE means Mahlako Gas Energy Proprietary Limited, registration number 2023/826238/07, a limited liability private company incorporated in the Republic of South Africa;
1.3.15
MOI or Memorandum of Incorporation means this amended Memorandum of Incorporation of the Company as adopted and filed by the Company with the Commission which is in the agreed form as set out in Appendix 4 of the Shareholders Agreement;
1.3.16
New Shares means Ordinary Shares issued by the Company pursuant to a Dilution Event;
1.3.17
Ordinary Shares means an ordinary share of no par value in the share capital of the Company having the preferences, rights, limitations and other terms set out in Part A of Appendix 1;
1.3.18
Ordinary Shareholder means the holder of an Ordinary Share;
1.3.19
Regulator means the government of South Africa (including any national, state, provincial, municipal or local government or any political or administrative subdivision thereof) and any department, ministry, agency, instrumentality, commission or other authority thereof;
1.3.20
Renergen means Renergen Limited, a public company incorporated in terms of the laws of South Africa under registration number 2014/195093/06;
1.3.21
Rules means any rules made in respect of the Company from time to time as contemplated in sections 15(3) to (5) of the Act and clause 1.11.5 hereof;
1.3.22
Senior Financing Documents means the Existing Financing Documents which includes the existing DFC financing documents; the existing DFC security documents; the IDC financing documents, and the IDC security documents, which are to be refinanced by the New Financing Documents. The New Financing Documents shall include inter alia the financing documents to be concluded between the Company, DFC and SBSA for the

 

68


 

 

 

purposes of refinancing the existing debt and financing phase II of the Viriginia gas project;

1.3.23
Shareholder means, subject to section 57(1) of the Act, the holder of a share issued by the Company and who is registered as such in the Company's securities register;
1.3.24
Shareholders Agreement means the sale, subscription and shareholders’ agreement entered into between MGE, Renergen and the Company dated 22 December 2023, and any other signed written agreement or signed written agreements in force from time to time between all or some of the Shareholders and the Company in terms of which the rights and obligations of the Shareholders amongst themselves (in their capacities as Shareholders) are regulated and in terms of which the relationship between each Shareholder and the Company is regulated; and
1.3.25
Shares means the Ordinary Shares and the A Ordinary Shares.
1.4
If any provision in a definition is a substantive provision conferring rights or imposing obligations on any person, notwithstanding that it is only in the definition clause, effect shall be given to it as if it were a substantive provision of this Memorandum of Incorporation.
1.5
Unless inconsistent with the context, an expression which denotes:
1.5.1
any gender includes the other genders;
1.5.2
a natural person includes an artificial person (including a trust) and vice versa; and
1.5.3
the singular includes the plural and vice versa.
1.6
When, in this Memorandum of Incorporation, a particular number of business days is provided for between the happening of one event and another, the number of days must be calculated by:
1.6.1
excluding the day on which the first such event occurs;
1.6.2
including the day on or by which the second event is to occur; and
1.6.3
excluding any public holiday in South Africa, Saturday or Sunday that falls on or between the days contemplated in clauses 1.6.1 and 1.6.2, respectively.
1.7
Where any term is defined within the context of any particular clause in this Memorandum of Incorporation, the term so defined, unless it is clear from the clause in question that the term so defined has limited application to the relevant clause, shall bear the same meaning ascribed to it for all purposes in terms of this Memorandum of Incorporation, notwithstanding that that term has not been defined in this interpretation clause.
1.8
Any reference in this Memorandum of Incorporation to any agreement or document will be construed as a reference to that agreement or document as initially concluded, and as amended, varied, novated or supplemented afterwards from time to time. Incorporation and nature of the company

 

69


 

 

 

1.9
Incorporation
1.9.1
The Company was incorporated on 26 April 2005 as a private company and accordingly, the transferability of the Securities of the Company is restricted as provided in this Memorandum of Incorporation, and any offer to the public to subscribe for any Securities of the Company is prohibited.
1.9.2
The Company is constituted subject to:
1.9.2.1
the provisions of the Shareholders Agreement;
1.9.2.2
the unalterable provisions of the Act;
1.9.2.3
any provisions set out in this Memorandum of Incorporation imposing on the Company a higher standard, greater restriction, longer period of time or any similar more onerous requirement, than would otherwise apply to the Company in terms of an unalterable provision of the Act;
1.9.2.4
the alterable provisions of the Act, subject to the limitations, extensions, restrictions, variations or substitutions set out in this Memorandum of Incorporation; and
1.9.2.5
the provisions of this Memorandum of Incorporation. and
1.9.2.6
its Rules, if any.
1.10
Powers of the Company
1.10.1
This Memorandum of Incorporation does not:
1.10.1.1
contain any restrictive conditions applicable to the Company and any requirement, in addition to the requirements set out in clause 1.11, for the amendment of any such conditions; and
1.10.1.2
prohibit the amendment of any particular provision hereof.
1.10.2
The Company has all of the legal powers and capacity of an individual, to the extent possible, subject to any restrictions, limitations or qualifications arising from this Memorandum of Incorporation.
1.10.3
It is hereby recorded that up until the Final Discharge Date:
1.10.3.1
to the extent that any provisions in this Memorandum of Incorporation are subject to the terms and conditions of the Senior Financing Documents, the Company shall perform such acts in accordance with the Senior Financing Documents; and
1.10.3.2
to the extent that any provisions of this Memorandum of Incorporation (including any decision or the implementation of any decision by the Board or Shareholders) require the consent of the Lenders, the Company will procure that such consent of the Lenders is obtained prior to the implementation of any such decision.
1.11
Memorandum of Incorporation and Company rules
1.11.1
This Memorandum of Incorporation of the Company may be altered or amended:

 

70


 

 

 

1.11.1.1
in compliance with a court order effected by a resolution of the Company's board; and
1.11.1.2
by a special resolution of the Shareholders provided that the written consent of MGE has been obtained.
1.11.2
An amendment contemplated in clause 1.11.1.2 may take the form of:
1.11.2.1
a new Memorandum of Incorporation in substitution for the existing Memorandum of Incorporation; or
1.11.2.2
one or more alterations to the existing Memorandum of Incorporation by:
1.11.2.2.1
changing the name of the Company;
1.11.2.2.2
deleting, altering or replacing any of its provisions;
1.11.2.2.3
inserting any new provisions; or
1.11.2.2.4
making any combination of such alterations.
1.11.3
After amending its Memorandum of Incorporation, the Company must file a Notice of Amendment with the Commission in accordance with the requirements contemplated in sections 16(7) and (8).
1.11.4
An amendment to this Memorandum of Incorporation takes effect:
1.11.4.1
in the case of an amendment that changes the name of the Company, on the date set out in the amended registration certificate issued by the Commission; or
1.11.4.2
in any other case, on the later of:
1.11.4.2.1
the date on, and time at, which the Notice of Amendment is filed with the Commission; or
1.11.4.2.2
the date, if any, set out in the Notice of Amendment.
1.11.5
The board has authority to make, amend or repeal any necessary or incidental rules relating to the governance of the Company in respect of matters that are not addressed in this Memorandum of Incorporation or the Act, by:
1.11.5.1
delivering a copy of those rules, or any amendment or repeal thereof, to every Shareholder by hand or by ordinary mail (at such Shareholder's registered address) or by publishing in a newspaper circulating in the area in which the Company's registered address is located. Alternatively, delivery may be by email, provided that the Shareholder has given the Company an email address for the purposes of receiving communications; and
1.11.5.2
filing a copy of those rules, or any amendment or repeal thereof, with the Commission.
1.11.6
Any necessary or incidental rules made, amended or repealed as contemplated in clause 1.11.5:
1.11.6.1
take effect on the later of:
1.11.6.1.1
ten business days after the rule is filed with the Commission; or

 

71


 

 

 

1.11.6.1.2
the date, if any, specified in the rule; and
1.11.6.2
are binding:
1.11.6.2.1
on an interim basis from the time it takes effect until it is put to a vote at the next general Shareholders meeting of the Company; and
1.11.6.2.2
on a permanent basis only if it has been ratified by an ordinary resolution at the meeting contemplated in clause 1.11.6.2.1.
1.11.7
Notwithstanding anything to the contrary contained in this MOI, no Rules may contravene or conflict with any provision of this MOI and/or any of the rights of any Shareholder as set out in this MOI and/or the Shareholders Agreement.
1.12
Alterations of Memorandum of Incorporation and Company rules, translations and consolidations of Memorandum of Incorporation
1.12.1
The Company's board, or an individual authorised by the board, may alter its Memorandum of Incorporation, in any manner necessary to correct a patent error in spelling, punctuation, reference, grammar or similar defect on the face of the document, by:
1.12.1.1
delivering a notice of the alteration in the manner contemplated in clause

1.11.5.1; and

1.12.1.2
filing a notice of the alteration with the Commission.
1.12.2
At any time after having filed its Memorandum of Incorporation with the Commission, the Company may file one or more translations of it, in any official language or languages of the Republic, provided that every such translation must be accompanied by a sworn statement by the person who made the translation, stating that it is a true, accurate and complete representation of the Memorandum of Incorporation.
1.12.3
At any time after having filed its Memorandum of Incorporation with the Commission, and having subsequently filed one or more alterations or amendments to it, the Company may (or if the Commission requires it to, must) file a consolidated revision of its Memorandum of Incorporation, as so altered or amended, provided that every such consolidated revision filed with the Commission in terms of clause 1.12.3 must be accompanied by:
1.12.3.1
a sworn statement by a Director; or
1.12.3.2
a statement by an attorney or notary public,

stating that it is a true, accurate and complete representation of the Company's Memorandum of Incorporation, as altered or amended up to the date of the statement.

1.12.4
To the extent necessary to implement an adopted business rescue plan and provided that the business rescue plan was approved by the Shareholders, as contemplated in section 152(3)(c), the Practitioner may in terms of section 152(6)(b) of the Act amend this Memorandum of Incorporation to authorise, and determine the preferences, rights, limitations and other terms of, any

 

 

72


 

 

 

securities that are not otherwise authorised, but are contemplated to be issued in terms of the business rescue plan, despite any provision of this Memorandum of Incorporation or of sections 16, 36 or 37 of the Act, to the contrary.

1.13
Application of optional provisions of the Act
1.13.1
The Company, as a private company, does not elect to comply voluntarily with the extended accountability requirements contained in Chapter 3 (Enhanced Accountability and Transparency) of the Act.
1.13.2
The Company, as a private company, does not voluntarily elect to be and have its securities subject to Parts B (Authority of Panel and Takeover Regulations) and C (Regulation of affected transactions and offers) of Chapter 5 of the Act and the Takeover Regulations.
1.14
Private company provisions
1.14.1
The Company is a private company and
1.14.1.1
the Directors may, in their reasonable discretion and without providing or being obliged to provide any reason, decline to register the transfer of any securities of the Company; and
1.14.1.2
no invitation shall be made to the public to subscribe for any securities of the Company.
2.
Conflict with the Shareholders Agreement

If the provisions of this Memorandum of Incorporation conflict with the Shareholders Agreement the Parties shall, to the extent permissible in law, amend this Memorandum of Incorporation (in accordance with the Act and the provisions of this Memorandum of Incorporation) in order to give effect to the objects, intention and purpose of the Shareholders Agreement. Pending such amendment, the Shareholders shall exercise all the rights attaching to their Shares so as to give effect to the provisions of the Shareholders Agreement to the maximum lawful extent.

3.
Securities of the company
3.1
Shares
3.1.1
The Company is authorised to issue the following Shares:

 

 

Number

 

Class

 

100 000 000

Ordinary Shares

5 500

A Ordinary Shares

3.1.2
The Shares will have the preferences, rights, limitations and other terms set out in Appendix 1 to this MOI.
3.1.3
Subject always to clause 5.10.1, and the prior approval of:

 

73


 

 

 

3.1.3.1
a special resolution of the Shareholders of the Company in the circumstances contemplated in section 41 of the Act; or
3.1.3.2
in any other case, an ordinary resolution of the Shareholders,

the Company's board is authorised to issue Shares at any time, but only within the classes, and only to the extent that the Shares have been authorised by or in terms of this Memorandum of Incorporation, provided that the Ordinary Shares and A Ordinary Shares shall be deemed to be one and the same class of Shares for this purpose;

3.1.4
Any such approval in terms of clause 3.1.2 may be in the form of a general authority to the Directors, whether conditional or unconditional, to allot or issue any Shares at their discretion, or in the form of a specific authority in respect of any particular allotment or issue of Shares. If any such approval is given in the form of a general authority to the Directors, it shall be valid only until the next annual general meeting but it may be varied or revoked by any general meeting of the Company prior to the holding of the next annual general meeting.
3.1.5
The authority of the board to:
3.1.5.1
increase or decrease the number of authorised Shares of any class;
3.1.5.2
reclassify any classified Shares that have been authorised but not issued;
3.1.5.3
classify any unclassified Shares that have been authorised but not issued; or
3.1.5.4
determine the preferences, rights, limitations or other terms of any class of Shares

is restricted or varied in the manner contemplated in clause 1.11.1.

3.1.6
Subject to clause 3.1.3 and the provisions of section 47, the board may approve the Issuing of any authorised Shares of the Company as capitalisation Shares or the issuing of Shares of one class as capitalisation Shares in respect of Shares of another class and may permit Shareholders to elect to receive a cash payment in lieu of a capitalisation share, provided that:
3.1.6.1
the Ordinary Shares and A Ordinary Shares shall be deemed to be one and the same class of Shares for this purpose;
3.1.6.2
only Ordinary Shares may be issued to Ordinary Shareholders and A Ordinary Shareholders as capitalization shares.
3.1.7
Securities of the Company are to be issued in certificated form.
3.1.8
A certificate evidencing any certificated securities of the Company:
3.1.8.1
must state on its face:
3.1.8.1.1
the name of the Company;
3.1.8.1.2
the name of the person to whom the securities were issued;

 

74


 

 

 

3.1.8.1.3
the number and class of Shares and the designation of the series, if any, evidenced by that certificate;
3.1.8.1.4
a number distinctive for each certificate; and
3.1.8.1.5
any restriction on the transfer of the securities evidenced by that certificate,

provided that any share certificate issued by the Company as a pre- existing company will not be invalidated solely by reason of it failing to comply with these requirements;

3.1.8.2
must be signed by two persons authorised by the board of the Company; and
3.1.8.3
is proof that the named security holder owns the securities, in the absence of evidence to the contrary.
3.1.9
A signature contemplated in clause 3.1.8.2 may be affixed to or placed on the certificate by autographic, mechanical or electronic means.
3.1.10
If a securities certificate is defaced, lost or destroyed, it may be replaced on payment of any duty payable on the new certificate and on such terms (if any) as to evidence, indemnity and payment of the out-of-pocket expenses of the Company of investigating such evidence and, in the case of loss or destruction, of advertising the same, as the board may think fit and, in the case of defacement, on delivery of the old certificate to the Company.
3.1.11
A securities certificate in the names of two or more persons shall be delivered to the person named first in the register, or to that person's authorised agent, and in case of the legal incapacity of any one or more of the joint registered holders of any security, the survivor then named first in the register will be the only person recognised by the Company as being entitled to such certificate, or any new certificate which may be issued in its place. The Company is not bound to register more than four persons as the holders of any security.
3.1.12
Subject to clause 3.1.13, the Company must enter in its securities register every transfer of certificated securities, including in the entry:
3.1.12.1
the name and address of the transferee;
3.1.12.2
the description of the securities or interest transferred;
3.1.12.3
the date of the transfer; and
3.1.12.4
the value of any consideration still to be received by the Company on each security or interest, in the case of a transfer of securities contemplated in sections 40(5) and (6).
3.1.13
The Company may make an entry contemplated in clause 3.1.12 only if the transfer is evidenced by a proper instrument of transfer in a form and substance satisfactory to the board that has been delivered to the Company; or
3.1.14
was effected by operation of law; or

 

75


 

 

 

3.1.15
was effected in compliance with the provisions of a Shareholders Agreement and did not arise out of, and does not, or will not, cause or constitute a breach of the provisions of a Shareholders Agreement.
3.2
Debt Instruments
3.2.1
The Company's board may authorise the Company to issue secured or unsecured debt instruments at any time, provided the prior written approval of MGE is obtained,
3.2.2
The board may grant special privileges associated with any debt instruments to be issued by the Company regarding:
3.2.2.1
attending and voting at general meetings;
3.2.2.2
the appointment of Directors; and
3.2.2.3
the allotment of securities that have been authorised; the redemption of debt instruments by the Company; or the substitution of the debt instrument by securities that have been authorised,

provided that any such authority may only be exercised with the prior written approval of MGE, and an ordinary resolution of the Shareholders.

3.3
Registration of beneficial interests

The authority of the Company's board to allow the Company's issued securities to be held by, and registered in the name of, one person for the beneficial interest of another person, is not restricted or varied by this Memorandum of Incorporation.

3.4
Restrictions on the transferability of Shares
3.4.1
The transferability of the securities of the Company is restricted, as contemplated in section 8(2)(b)(ii)(bb).
3.4.2
No Shareholder may transfer the registered or beneficial ownership of any Shares in the Company to any other party without first obtaining the other Shareholder's written consent in respect of the identity of such third party purchaser and such consent shall not be unreasonably withheld, delayed or conditioned and without complying with any rights and/or obligations of Shareholders as set out in any shareholders agreement between the Company and such Shareholders.
4.
Shareholders
4.1
Shareholders' right to information

In addition to the records of the Company referred to in section 26 of the Act, each Shareholder shall have access to the financial books and records of the Company, including, but not limited to, access to the management accounts of the Company.

 

76


 

 

 

4.2
Shareholders' authority to act
4.2.1
If the Company has only one Shareholder, the ability of that Shareholder to exercise any or all of the voting rights pertaining to the Company on any matter, at any time, without notice or compliance with any other internal formalities, is not restricted or varied by this Memorandum of Incorporation
4.2.2
If, at any time, every Shareholder is also a Director, the authority of the Shareholders to act on any matter that is required to be referred by the Company's board to the Shareholders for decision at any time after being referred by the board, without notice or compliance with any other internal formalities, is not restricted or varied by this Memorandum of Incorporation
4.2.3
A resolution which could be voted on at a Shareholders meeting may instead be adopted by unanimous written consent of the Shareholders, given in person or by electronic communication, provided that the resolution was submitted for consideration to the Shareholders and the resolution is voted on in writing or by electronic communication by all Shareholders within 20 business days after the resolution was submitted to them. Such a resolution shall be valid and effective as if passed at a Shareholders' meeting,
4.2.4
Within five business days after adopting a resolution in terms of clause 4.2.3, the Company shall deliver notice of the results of the vote to every Shareholder who was entitled to vote on or consent to the resolution.
4.3
Votes of Shareholders
4.3.1
Subject to the Act and subject to any special terms as to voting upon which any share may be issued or may for the time being be held, if voting on a particular matter is:
4.3.1.1
by a show of hands, any person present and entitled to exercise voting rights has one vote, irrespective of the number of voting rights that person would otherwise be entitled to exercise; and
4.3.1.2
by polling, any person who is present at the meeting, whether in person or by proxy, and is entitled to exercise the voting rights attributable to the Shares held by that person.

A polled vote must be held on any particular matter to be voted on at a meeting if a demand for such a vote is made by a shareholder.

4.3.2
In the case of joint holders of a share, only the vote of the senior holder shall be accepted, whether in person or by proxy. For the purpose of this clause, seniority shall be determined by the order in which the names appear in the register or, in the case of persons entitled to a share by transmission, the order in which their names were given in the notice to the Company of that transmission.
4.3.3
Any entity holding Shares conferring the right to vote may, by resolution of the directors or other governing body of that entity, authorise one person to act as its representative at any Shareholders meeting. The representative shall be entitled to exercise the same powers as that entity could exercise if

 

77


 

 

 

it were an individual Shareholder. The board may require proof to their satisfaction of the appointment or authority of a representative to act.

4.4
Proxies and voting under power of attorney
4.4.1
A Shareholder may, at any time, appoint any individual, including an individual who is not a Shareholder, as a proxy to:
4.4.1.1
participate in, and speak and vote at, a Shareholders meeting on behalf of the Shareholder; or
4.4.1.2
give or withhold written consent on behalf of the Shareholder to a decision by Shareholders acting other than at a meeting.
4.4.2
The instrument that appoints a proxy must:
4.4.2.1
be in writing, dated and signed by the Shareholder; and
4.4.2.2
be given by the person appointing such proxy or by their attorney duly authorised in writing or, if the appointer is a corporation, given by a representative so authorised.
4.4.3
The holder of a power of attorney from a Shareholder may, if so authorised by the power of attorney, vote for and represent such Shareholder at any meeting of the Company.
4.4.4
Every instrument of proxy, whether for a specified meeting or otherwise, must comply with section 58 of the Act and subject thereto be in the following format, or in such other form as the Company's board may approve, and the board may, if they think fit, send out with the notice of any meeting proxy forms for use at the meeting:

"1/1/1/e

of

being a Shareholder/Shareholders of the Company appoint

.................................of .... ..... .... ... .. .... ........ ... ... ..... or failing him or

her

.....................................of or failing him or

her

the chairman of the Company or failing him or her the chairman of the meeting as my I our proxy to:

[participate in, and speak and vote for me / us at a Shareholders meeting of the Company to be held at ............................... on ............................

20

............................................................................................................................

at

(time appointed) and at any adjournment thereof.]/

[give or withhold written consent on my/our behalf to the written resolutions to which this form of proxy Is attached, as contemplated in section 60 of the Act]/

[participate in, and speak and vote for me/us at any Shareholders meeting held by the Company, or give or withhold written consent on my/ our behalf in respect of any decision contemplated in section 60 of the Act,

 

78


 

 

between the date of this proxy instrument and 20

]*

Dated this ............... day of ................ 20.......

Name (in full) Address

Signature

* Delete as applicable

I/ We desire to vote as follows:

 

 

For

 

Against

 

Abstain

 

 

 

 

 

 

Resolution No. 1

Resolution No. 2

(Set out the numbers of the resolutions if more than 1)

Indicate voting preference by placing a mark (either a tick or a cross) in the appropriate block."

4.5
Representation by concurrent proxies

The right of a Shareholder to appoint two or more persons concurrently as proxies, and to appoint more than one proxy to exercise voting rights attached to different securities held by the Shareholder is not restricted or varied by this Memorandum of Incorporation

4.6
Authority of proxy to delegate

The authority of a Shareholder's proxy to delegate that proxy's authority to act on behalf of the Shareholder, subject to any restriction set out in the instrument appointing that proxy, is not restricted or varied by this Memorandum of Incorporation.

4.7
Requirement to deliver proxy Instrument to the Company

The requirement that a Shareholder must deliver to the Company, or any other person on behalf of the Company, a copy of the instrument appointing a proxy before that proxy may exercise any of the Shareholder's rights at a Shareholders meeting, is not restricted or varied by this Memorandum of Incorporation.

4.8
Deliberative authority of proxy

The authority of a Shareholder's proxy to decide without direction from the

 

79


 

 

 

Shareholder whether to exercise, or abstain from exercising, any voting right of the Shareholder, except to the extent that the instrument appointing that proxy provides otherwise, is not restricted or varied by this Memorandum of Incorporation.

4.9
Validity of appointment
4.9.1
The proxy appointment remains valid only for its intended purpose, provided that it may be revoked at any time by cancellation in writing, or the making of a later inconsistent appointment of another proxy, and delivering a copy of the revocation instrument to the proxy, and to the Company.
4.9.2
The appointment of a proxy is suspended at any time and to the extent that the Shareholder chooses to act directly and in person in the exercise of any rights as a Shareholder.
4.9.3
A vote given in accordance with the terms of an instrument of proxy or power of attorney appointing a proxy shall be valid notwithstanding the legal incapacity of the Shareholder or revocation of the instrument or power of attorney or of the transfer of the securities in respect of which the vote is given, unless notice In writing of such legal incapacity, revocation or transfer is received by or on behalf of the Company not less than 24 hours (or such lesser period as the board of the Company may determine in relation to any particular meeting) before the time appointed for holding the meeting.
4.10
Record date for exercise of Shareholder rights
4.10.1
If, at any time, the Company's board fails to determine a record date for any action or event, the record date for the relevant matter is:
4.10.1.1
in the case of a meeting, the latest date by which the Company is required to give Shareholders notice of that meeting; or
4.10.1.2
in any other case, the date of the action or event.
5.
Shareholders Meetings
5.1
Requirement to hold meetings

The Company is not required to hold any Shareholders meetings other than those specifically required by section 61 of the Act and this clause 5, but may do so.

5.2
Right to call meeting

The Company's board may in terms of section 61(1) of the Act call a Shareholders meeting at anytime.

5.3
Shareholders' right to requisition a meeting
5.3.1
The right of Shareholders to requisition the Company's board to call a Shareholders meeting may be exercised if, in aggregate, written and signed demands for a meeting with substantially the same purpose are made by Shareholders entitled to exercise at least 5% of the voting rights exerciseable

 

80


 

 

 

by all Shareholders, provided that each such demand describes the specific purpose for which the meeting is proposed.

5.3.2
In addition, any general meeting may be called by any Shareholder(s) holding, in the case of A Ordinary Shares, not less than 5 000 A Ordinary Shares, and otherwise amounting to not less than 5% (five percent) of the Company's issued Shares.
5.4
Location of Shareholders meetings
5.4.1
Meetings will be held at a reasonable time and venue. In the ordinary course, meetings will be held at the principal place of business of the Company.
5.4.2
Subject to clause 5.4.1 the authority of the Company's board to determine the location of any Shareholders meeting and the authority of the Company to hold any such meeting in South Africa or in any foreign country, is not restricted or varied by this Memorandum of Incorporation.
5.5
Calling a Shareholders meeting

If the Company is unable to convene a Shareholders meeting because it has no Directors or because all of its Directors are incapacitated, any Shareholder may convene a meeting.

5.6
Notice of Shareholders meetings
5.6.1
The minimum number of days for the Company to deliver a notice of a Shareholders meeting to the Shareholders is five business days before the meeting is to begin or 24 hours if agreed on unanimously in writing by all Shareholders.
5.6.2
A notice of a meeting must be in writing and include the information set out in sections 62(3) and 63(3) of the Act.
5.7
Electronic participation in Shareholders meeting

The authority of the Company to conduct a Shareholders meeting entirely by electronic communication, or to provide for participation in a meeting by electronic communication, provided that the electronic communication employed ordinarily enables all persons participating in that meeting to communicate concurrently with each other without an intermediary, and to participate reasonably effectively in the meeting, is not restricted or varied by this Memorandum of Incorporation.

5.8
Quorum for Shareholders meetings
5.8.1
Subject to the provisions of clauses 5.8.3 to 5.8.6 (both inclusive), the quorum for:
5.8.1.1
a Shareholders meeting to begin is sufficient persons present at the meeting to exercise, in aggregate, at least 50% of all of the voting

 

81


 

 

 

rights that are entitled to be exercised in respect of at least one matter to be decided at the meeting, provided that MGE is present; and

5.8.1.2
a matter to begin to be considered at the meeting is sufficient persons present at the meeting to exercise, in aggregate, at least 50% of all of the voting rights that are entitled to be exercised on that matter at the time the matter is called on the agenda, provided MGE is present.
5.8.2
Any Shareholder who participates at the commencement and for the duration of a meeting by way of a telephone conference call or by way of a video conference or other audio, audio visual or electronic means shall be deemed to be present at the meeting and counted towards the quorum
5.8.3
If, within 30 minutes after the appointed time for a meeting to begin, the requirements of clauses 5.8.1:
5.8.3.1
for that meeting to begin have not been satisfied, the meeting is postponed without motion, vote or further notice, for one week, to be held at the same time and place; and
5.8.3.2
for consideration of a particular matter to begin have not been satisfied:
5.8.3.2.1
if there is other business on the agenda of the meeting, consideration of that matter may be postponed to a later time in the meeting without motion or vote; or
5.8.3.2.2
if there is no other business on the agenda of the meeting, the meeting is adjourned for one week, to be held at the same time and place, without motion or vote.
5.8.4
The person intended to preside at a meeting, where the quorum requirements in clause 5.8.1 are not satisfied, may extend the 30 minute limit allowed for a reasonable period on the grounds that:
5.8.4.1
exceptional circumstances affecting weather, transportation or electronic communication have impeded, or are impeding, the ability of Shareholders to be present at the meeting; or
5.8.4.2
one or more delayed Shareholders have communicated an intention to attend the meeting, and those Shareholders, together with others in attendance, would satisfy the quorum requirements; or
5.8.4.3
any other reason such person considers appropriate.
5.8.5
After a quorum has been established for a meeting, or for a particular matter, the meeting may continue, or the matter may be considered, so long as at least one Shareholder with voting rights entitled to be exercised at the meeting, or on that matter, is present at the meeting.
5.8.6
If the quorum requirements in clause 5.8.1 have not been satisfied at the time appointed for a postponed meeting to begin, or for an adjourned meeting to resume, the Shareholders present in person or by proxy will be deemed to constitute a quorum.

 

82


 

 

 

5.9
Adjournment of Shareholders meetings
5.9.1
Subject to clauses 5.8, 5.9.2 and 5.9.3, a Shareholders meeting or the consideration of any matter at the meeting, may be adjourned from time to time, on a motion supported by persons entitled to exercise, in aggregate, a majority of the voting rights held by all of the persons who are present at the meeting at the time and that are entitled to be exercised on at least one matter remaining on the agenda of the meeting, or on the matter under consideration, as the case may be.
5.9.2
An adjournment of a meeting, or the consideration of a matter at the meeting, in terms of clause 5.9.1, may be either to a fixed time and place or until further notice, as agreed at the meeting.
5.9.3
A meeting may not be adjourned beyond the earlier of:
5.9.3.1
120 business days after the record date determined in accordance with clause 4.10; or
5.9.3.2
60 business days after the date on which the adjournment occurred.
5.10
Shareholders resolutions
5.10.1
Notwithstanding anything to the contrary contained in this Memorandum of Incorporation, the Company shall not, and the Shareholders undertake to procure (to the extent that it is within their respective powers to do so) that the Company shall not, engage in, agree to, perform or undertake any of the Specially Protected Matters unless the prior written approval of MGE is obtained in relation thereto, such written consent not to be unreasonably withheld or delayed, and the Directors’ powers shall be limited accordingly.
5.10.2
For an ordinary resolution to be approved by Shareholders, it must be supported by the holders of more than 50% of the voting rights exercised on that resolution by Shareholders entitled to vote on such resolution.
5.10.3
For a special resolution to be approved by Shareholders, it must be supported by the holders of at least 75% of the voting rights exercised on that resolution by Shareholders entitled to vote on such resolution.
5.11
Annual General Meeting
5.11.1
The Company must hold an annual general meeting:
5.11.1.1
initially, no more than 18 months after its date of incorporation; and
5.11.1.2
thereafter, once in every calendar year, but no more than 15 months after the date of the previous annual general meeting.
5.11.2
In addition to the requirements of clause 5.6, the notice calling an annual general meeting must include:
5.11.2.1
the financial statements to be presented, or a summarised form thereof; and
5.11.2.2
directions for obtaining a copy of the complete annual financial statements for the preceding financial year.

 

83


 

 

 

5.11.3
The agenda at an annual general meeting shall include but shall not be limited to:
5.11.3.1
presentation of the Directors' report and annual financial statements for the immediately preceding financial year;
5.11.3.2
election of Directors, to the extent required by the Act or this Memorandum of Incorporation; and
5.11.3.3
any matters raised by Shareholders, with or without advance notice to the Company.
6.
Directors and officers
6.1
Composition of the board
6.1.1
The Company's board may comprise of a maximum of eight Directors (excluding alternate directors).
6.1.2
Subject to the provisions of the Shareholders Agreement and the Act:
6.1.2.1
MGE shall, for so long as it is entitled to exercise 5% or more of the voting rights exercisable by Shareholders, be entitled to appoint 2 (two) Directors, whose identity shall, if such Director is not an employee of MGE, be subject to Renergen’s prior written approval, acting reasonably, and not to be unreasonably withheld, delayed or conditioned;
6.1.2.2
Renergen shall, for so long as it remains a Shareholder, be entitled to appoint 5 (five) Directors to the board; and
6.1.2.3
the Shareholders must jointly nominate and appoint one independent Director to the board, and such person could also be an independent director of Renergen.
6.1.3
If a Shareholder or Shareholders collectively, have exercised the right to appoint Directors in terms of the provisions of clause 6.1, such Shareholder or Shareholders may remove any such appointee from the Board and may replace any such nominee so removed, or one who has otherwise ceased to be a Director and/or Alternate Director, mutatis mutandis in accordance with clause 6.1.
6.1.4
The appointment or removal of a Director by a Shareholder in terms of this clause 6.1, shall be effected by notice by such Shareholder in writing to the Company and will be operative immediately upon receipt by the Company of such written notice and a written consent by such person to serve as a Director, provided that in the case of an appointment, such written notice shall be accompanied by a written acknowledgement by such Director that he shall be deemed ipso facto to have resigned from office as such forthwith upon the happening of either of the events referred to in clause 6.1.8 below in relation to him, which written acknowledgement shall appoint the Shareholder who appointed such Director as his agent to sign all such documents and do all such things as are necessary or requisite to give effect to and implement his resignation.

 

84


 

 

 

6.1.5
Each Shareholder hereby irrevocably and unconditionally:
6.1.5.1
agrees, when requested by any other Shareholder to do so, to vote all of its Shares in favour of any resolution to appoint or remove any Director/s nominated and/or appointed in terms of this MOI by the Shareholder making the request, unless that Director has previously been removed from that capacity in terms of the provisions of section 71 of the Act; and
6.1.5.2
appoints the Shareholder making the request as its proxy and agent in rem suam to represent it at any general meeting convened and held, including any meeting held, in terms of section 71 for purposes of passing any resolution appointing or removing any one or more of the Director/s concerned, and to sign and execute any document (including any proxy or round-robin resolution) necessary or desirable to give effect to the provisions of this clause 6.1.5.2.
6.1.6
The authority of the board to fill any vacancy on the board on a temporary basis is not restricted or varied by this Memorandum of Incorporation. A Director appointed on a temporary basis must be a person who satisfies the requirements for election as a Director and has all the powers, functions and duties, and is subject to all the liabilities, of any other Director.
6.1.7
If the number of Directors falls below the maximum number provided in clause 6.1.1, the failure by the Company to have the maximum number of Directors does not limit or negate the authority of the board or Invalidate anything done by the board or the Company.
6.1.8
To become or to continue to act as a Director or a prescribed officer of the Company, a person must not be:
6.1.8.1
a juristic person;
6.1.8.2
an unemancipated minor, or a person under a similar legal disability;
6.1.8.3
a person who has been declared a delinquent or placed under probation by a court in terms of section 162 or section 47 of the Close Corporations Act, 1984, except to the extent permitted by the order of probation;
6.1.8.4
an unrehabilitated insolvent;
6.1.8.5
prohibited in terms of any public regulation to be a Director;

 

6.1.8.6
removed from an office of trust, on the grounds of misconduct involving dishonesty;
6.1.8.7
a person who has been convicted, in the Republic or elsewhere, and imprisoned without the option of a fine, or fined more than the prescribed amount, for theft, fraud, forgery, perjury or an offence:
6.1.8.7.1
involving fraud, misrepresentation or dishonesty;
6.1.8.7.2
in connection with the promotion, formation or management of a company;

 

85


 

 

 

6.1.8.7.3
in connection with having been appointed or elected as a Director or acting as a Director whilst ineligible or disqualified, or whilst having been placed under probation by a court; or
6.1.8.7.4
under the Act, the Insolvency Act, 1936, the Close Corporations Act, 1984, the Competition Act, 1998, the Financial Intelligence Centre Act, 2001, the Securities Services Act, 2004, or Chapter 2 of the Prevention and Combating of Corruption Activities Act, 2004.
6.1.9
A person need not satisfy any further eligibility requirements or qualifications.
6.2
Alternate Directors
6.2.1
An alternate Director may be elected or removed by the Shareholders entitled to exercise voting rights in such an election to act as an alternate Director in a Director's place as the occasion arises and during that Director's absence, provided that such person has been approved for that purpose by a resolution of the Company's board.
6.2.2
An alternate Director shall, except as regards the power to receive remuneration, be subject in all respects to the terms and conditions applicable to the Director on whose behalf the alternate acts, and each alternate Director shall be entitled:
6.2.2.1
to receive notice of all meetings of the Directors or of any committee of the Directors of which the Director on whose behalf the alternate acts is a member;
6.2.2.2
to attend and vote at any such meetings at which the Director on whose behalf the alternate acts is not personally present;
6.2.2.3
to furnish written consent to adopt a decision which could be voted on at a board meeting;
6.2.2.4
to be appointed as an alternate to more than one Director and shall have a vote for each Director for whom such alternate acts, in addition to their own vote as Director, if any; and
6.2.2.5
generally, to exercise and discharge au the functions, powers and duties of the Director on whose behalf the alternate acts in such Director's absence as if such alternate were a Director.
6.2.3
In addition to 6.2.1, an alternate Director shall also cease to be an alternate Director if the Director on whose behalf the alternate acts ceases for any reason to be a Director, but if any Director retires and is re-elected at the same meeting, any appointment made in respect of such Director shall remain in force as though the Director had not retired.
6.3
Authority of the board
6.3.1
The authority of the Company's board to exercise all of the powers and perform any of the functions of the Company and to manage and direct the

 

86


 

 

 

business and affairs of the Company, is not restricted or varied by this Memorandum of Incorporation.

6.3.2
If, at any time, the Company has only one Director, the authority of that Director to act without notice or compliance with any other internal formalities, is not restricted or varied by this Memorandum of Incorporation.
6.3.3
Each Director and each alternate Director, prescribed officer and member of any committee of the Board (whether or not such latter persons are also members of the Board) shall, subject to the exemptions contained in section 75(2) of the Act and the qualifications contained in section 75(3) of the Act, comply with all of the provisions of section 75 of the Act in the event that they (or any person who is a related person to them) has a personal financial interest in any matter to be considered by the Board.
6.4
Directors' meetings
6.4.1
A Director authorised by the board of the Company:
6.4.1.1
may call a meeting of the board at any time; and
6.4.1.2
must call such a meeting if required to do so by at least:
6.4.1.2.1
two Directors.
6.4.2
Notwithstanding any other provision of this MOI any Director may call a meeting of Directors if such Director considers there is good reason to do so.
6.4.3
Notwithstanding any other provision of this MOI, the Board shall meet at least once every quarter at such place as the Board may from time to time determine.
6.4.4
The authority of the board to conduct a meeting entirely by electronic communication, or to provide for participation In a meeting by electronic communication, so long as the electronic communication facility employed ordinarily enables all persons participating in that meeting to communicate concurrently with each other without an intermediary, and to participate effectively in the meeting, is not restricted or varied by this Memorandum of Incorporation.
6.4.5
The authority of the board to adopt a decision, that could be voted on at a board meeting, by way of written consent of a majority of the Directors, given in person or by electronic communication, provided that each Director has received notice of the matter to be decided, is not restricted or varied by this Memorandum of Incorporation. Any decision made in the manner contemplated in this clause 6.4.5 has the same effect as if it had been approved by voting at a meeting.
6.4.6
The notice period for the convening of any meeting of the Board will be at least 5 Business Days, unless the decision of the Directors is required on an urgent basis which justifies a shorter period of notice, in which event the meeting may be called on such notice (an "Urgent Basis").

 

87


 

 

 

6.4.7
Whether a meeting of the Board can be called on an Urgent Basis shall be decided by not less than 2 (two) Directors, one of whom has been nominated for appointment by MGE provided that, where the matter to be decided upon an Urgent Basis relates to compliance with the rules of any securities exchange on which Renergen's shares are listed within an urgent timeframe, or compliance with the requirements of any other Regulator having authority over the Company or its Business, any two Directors may determine that the meeting be called on an Urgent Basis. Notices calling a meeting on an Urgent Basis shall be given to all of the Directors and their alternates together with an explanation of the matter or matters to be considered and decided upon and an explanation of the reason for calling the meeting on an Urgent Basis. Directors not able to be present at or participate in the meeting shall be afforded the opportunity to ask questions and provide input through communications with the Chairperson.
6.4.8
The authority of the Board to proceed with a meeting even if there was a failure to give the required notice or there was a defect in the giving of such notice, provided that all of the Directors acknowledge actual receipt of the notice or are present at the meeting or waive notice of the meeting, is not restricted or varied by this Memorandum of Incorporation.
6.4.9
Notices of Board meetings shall be given to all Directors and their alternates, together with an agenda for the meeting and copies of any documentation required to be considered or discussed at the meeting. Quarterly reports shall be provided to the Board once a quarter.
6.4.10
The quorum requirement for a meeting is a majority of Directors provided that one Director nominated by MGE is present.
6.4.11
If a quorum is not present within 30 (thirty) minutes after the time appointed for the commencement of any meeting of the Board, that meeting shall stand adjourned to the second Business Day succeeding the day of the adjourned meeting, at the same time and place and timeous written notice shall be given to all the Directors, whether or not present at the meeting so adjourned, of the time, date and place to which such meeting has been so adjourned. A notice in this regard given at the address and/or email of a Director as furnished to the Company by such Director shall be deemed to constitute compliance with this clause 6.4.11 in respect of such Director.
6.4.12
Should no quorum once again be present at any adjourned meeting, then those Directors present will constitute a quorum.
6.4.13
Notwithstanding anything to the contrary contained in this Memorandum of Incorporation, the Company shall not be entitled to implement any of the following actions without a board resolution passed by the majority of the Board and provided that the Director/s nominated by MGE have voted in favour of such a resolution:
6.4.13.1
any decision not to insure against any such risks as may be recommended

by the Company’s insurance broker and/or advisors;

6.4.13.2
the approval of the Company’s annual financial statements; and
6.4.13.3
any change to the Auditors,

 

88


 

 

 

it being agreed that the MGE nominated Director/s shall, to the extent legally permissible, not act unreasonably in respect of any such resolution.

6.4.14
Each Director has one vote on a matter and a majority of votes cast on a resolution is sufficient to approve that resolution.
6.5
Chairperson of the Board
6.5.1
The chairperson of the Board (the "Chairperson") shall be appointed, removed or replaced by the directors from time to time and will, in the ordinary course, be the chair of the meetings of the Board and the shareholders.
6.5.2
In the event of a deadlock of votes by directors on the Board, the Chairperson shall have a casting vote.
6.5.3
The chairperson of the Board shall preside as the chairperson of each meeting of the Board. If the chairperson is not present or is not willing to act, the Directors present shall elect 1 (one) of their number to be the chairperson of that meeting of the Board.
6.5.4
The chairperson shall, subject to the Act and this MOI and any decision of the Board, determine the procedure to be followed at all meetings of the Board.
6.6
Directors' power to effect borrowing

The Company's board may, subject to clause 5.10.1 raise or borrow money from time to time for the purposes of the Company, or secure the payment, of such sums as they think fit and may secure the repayment or payment of any such sums by guarantee, bond or mortgage upon all or any of the property or assets of the Company or by the issue of debt instruments or otherwise as they may think fit.

6.7
Directors' compensation and financial assistance
6.7.1
The authority of the Company to pay remuneration to the Directors, in accordance with a special resolution approved by the Shareholders within the previous two years, is not restricted or varied by this Memorandum of Incorporation.
6.7.2
The authority of the Company's board to authorise the Company to provide financial assistance by way of a loan, guarantee, the provision of security or otherwise to any person for the purpose of, or in connection with, the subscription of any option, or any securities, issued or to be issued by the Company or a related or inter-related company, or for the purchase of any securities of the Company or a related or Inter-related company, subject to the provisions of sections 44(3) and 44(4) of the Act is not restricted or varied by this Memorandum of Incorporation save as contemplated in clause 1.10.3 hereof
6.7.3
The authority of the Company's board to authorise the Company to provide financial assistance to a Director or prescribed officer of the

 

89


 

 

 

Company or a related or inter-related company, or to a related or inter-related company or corporation or to a member of a related or inter-related company or corporation, or to a person related to any such person or entity, subject to the provisions of sections 45(3) and 45(4) of the Act is not restricted or varied by this Memorandum of Incorporation save as contemplated in clause 1.10.3 hereof.

6.8
Indemnification of Directors
6.8.1
For purposes of this clause 6.8, Director includes a former Director, an alternate Director, a prescribed officer or a person who is a member of a committee of a board of the Company, or of the audit committee of the Company, irrespective of whether or not the person is also a member of the board.
6.8.2
The authority of the Company to advance expenses to a Director or indemnify a Director in respect of the defence of legal proceedings, as set out in section 78(4) is not restricted or varied by this Memorandum of Incorporation.
6.8.3
The authority of the Company to indemnify a Director in respect of any liability for which the Company may indemnify a Director, is not restricted or varied by this Memorandum of Incorporation
6.8.4
The authority of the Company to purchase insurance to protect:
6.8.4.1
a Director against any liability or expenses for which the Company may indemnify a Director as contemplated in clause 6.8.2 or clause

6.8.3; or

6.8.4.2
the Company against any contingency including but not limited to any expenses that the Company is permitted to advance or for which the Company is permitted to indemnify a Director as contemplated in clause 6.8.2 or any liability for which the Company is permitted to indemnify a Director as contemplated in clause 6.8.3,

is not restricted or varied by this Memorandum of Incorporation.

6.8.5
The Company shall be entitled to claim restitution from a Director or a related company for any money paid directly or indirectly by the Company to or on behalf of that Director in any manner inconsistent with this clause 6.8 or the Act.
6.9
Powers and responsibilities of the Board
6.9.1
The Board shall be responsible for the day to day running and control of the business of the Company and in this regard shall, inter alia,:
6.9.1.1
act in the best interests of the Company;
6.9.1.2
carry out its duties in a professional and ethical manner;
6.9.1.3
perform its functions in conformity with sound business practice;

 

90


 

 

 

6.9.1.4
procure that the Company timeously complies with all of its statutory obligations;
6.9.1.5
keep proper accounting records;
6.9.1.6
prepare or procure interim financial statements of the Company to be prepared within 3 (three) months of August and February of each year and deliver a copy of each set of such interim financial statements to each of the Shareholders; and
6.9.1.7
prepare or procure the preparation of annual financial statements in accordance with International Financial Reporting Standards, and, cause them to be audited by the Auditors and deliver a copy of each set of such audited annual financial statements to each of the Shareholders within 3 (three) months of the end of the financial year to which they relate.
6.10
Committees of the board
6.10.1
By virtue of the Company being a subsidiary of Renergen, the Renergen Social and Ethics Committee and Renergen Audit and Risk Committee (the "Sub-Committees") shall therefore perform the same function in respect of the Company.
6.10.2
MGE shall be entitled to appoint an observer (the "Observer") to the Sub-Committees to participate in discussions by the Sub-Committees in respect of the Company.
6.10.3
The Observer shall:
6.10.3.1
recuse him/herself from any Sub-Committee discussions not pertaining to the Company; and
6.10.3.2
not be entitled to exercise any votes in respect of matters dealt with by the Sub-Committees.
6.10.4
Subject to the provisions of clause 6.10.1 to 6.10.3 above, the authority of the Company's board to appoint any number of committees of Directors for managing any of the affairs of the Company and to delegate to any such committee any authority of the board, is not restricted or varied by this Memorandum of Incorporation.
6.10.5
Subject to the provisions of clause 6.10.1 to 6.10.3 above and subject to the powers and authorities granted by the board to any such committee, the authority of:
6.10.5.1
the board to include persons who are not Directors of the Company, provided that such persons are not ineligible or disqualified from being a Director as contemplated in clause 6.1.8 and the Act and that no such person shall vote on a matter to be decided by the committee;
6.10.5.2
the committee to consult with or receive advice from any other person; and
6.10.5.3
the committee to exercise the full authority of the board in respect of a matter referred to it,

 

91


 

 

 

is not restricted or varied by this Memorandum of Incorporation.

6.11
Authentication of documents
6.11.1
The Chairperson of the board, the secretary of the Company or any person appointed by the Directors for this purpose shall have power to authenticate any resolutions passed by the Shareholders or the Directors, and any books, records, accounts and other documents relating to the Company, and to certify copies or extracts from those documents as true copies or extracts and where any books, records, documents or accounts are elsewhere than at the registered office, the local manager or other officer of the Company having the custody of the documents at such other place shall be deemed to be the person so appointed.
6.11.2
A document purporting to be a copy of a resolution of the Directors or Shareholders or an extract from the minutes of a meeting of the Directors or Shareholders which is certified in accordance with clause 6.11.1 is prima facie evidence in favour of all persons dealing with the Company that such resolution has been duly passed or, as the case may be, that such extract is a true and accurate record of a duly constituted meeting of the Directors or Shareholders.
7.
General Provisions
7.1
Distributions
7.1.1
The Company may from time to time make a proposed distribution if that distribution is pursuant to an existing legal obligation of the Company, or a court order; or
7.1.2
authorised by a resolution of the Company's board,
7.1.3
is made in compliance with any dividend policy adopted by a special majority of the Shareholders, or any such resolution which specifically authorises the particular distribution; it reasonably appears that the Company will satisfy the solvency and liquidity test immediately after completing the propose distribution; and
7.1.4
the board of the Company has acknowledged that it has applied the solvency and liquidity test and reasonably concluded that the Company will satisfy the solvency and liquidity test immediately after completing the proposed distribution.No distribution shall bear interest as against the Company, except as otherwise provided under the conditions of issue of the Shares in respect of which such distribution is payable.
7.1.5
Distributions may be made either free of or subject to the deduction of Income tax and any other tax or duty for which the Company may be charged or which the Company may be required by law to withhold.
7.1.6
The Directors may from time to time declare and pay to the Shareholders such interim distributions as the Directors consider to be appropriate, subject to the limitations recorded in clause 7.1.

 

 

92


 

 

 

7.1.7
Subject to complying with applicable law, including in particular section 46, and the provisions of the Shareholders Agreement, the Company shall make a specific distribution or make distributions generally, if and to the extent that the Company is required to do so by a decision of the Shareholders taken as a Specially Protected Matter.
7.1.8
All unclaimed distributions may be invested or otherwise made use of by the board for the benefit of the Company until claimed by the person entitled to the distribution at any time before that distribution has been declared forfeit in terms of clause 7.1.9.
7.1.9
Distributions unclaimed for a period of not less than three years from the date on which such distributions became payable by the Company may be declared forfeited by the board for the benefit of the Company, or if so resolved by the board unclaimed distributions may be settled by the Company upon trustees to be held in trust for the benefit of the relevant Shareholders, after which the liability of the Company in respect of those distributions will be extinguished.
7.1.10
Any distribution, interest or other sum payable in cash to the holder of a Share may be paid by electronic funds transfer, free of set-off, in the currency of South Africa to the bank account nominated by such Shareholder, in writing, and verified by means of a copy of a bank statement with an original bank stamp or by such other means as may be acceptable to the Directors and, in the case of joint holders, to the bank account so nominated and verified of the holder whose name appears first in the Securities Register.
7.1.11
A distribution may also be paid in any other way determined by the Directors, and if the directives of the Directors in that regard are complied with, the Company shall not be liable for any loss or damage which a Shareholder may suffer as a result thereof.
7.1.12
A holder or any one of two or more joint holders, or his or their agent duly appointed in writing, may give valid receipts for any distributions or other monies paid in respect of a Share held by such holder or joint holders.
7.1.13
Where any difficulty arises in regard to such distribution, the Directors may settle that difficulty as they think expedient, and in particular may fix the value which shall be placed on such specific assets on distribution.
7.1.14
The Directors may —
7.1.14.1
determine that cash payments shall be made to any Shareholder on the basis of the value so fixed in order to secure equality of distribution; and
7.1.14.2
vest any such assets in trustees upon such trusts for the benefit of the persons entitled to the distribution as the Directors deem expedient.
7.2
Accounts
7.2.1
The Company's board must keep accurate and complete accounting records required or prescribed by the Act.

 

 

93


 

 

 

 

94


 

 

 

7.2.2
The accounting records must be kept at the registered office of the Company or (subject to the provisions of section 25 of the Act) at such other location within the Republic as the board think fit, and shall at all times be accessible and open to inspection by the board and the Shareholders.
7.2.3
The board must, in accordance with sections 30 and 31 of the Act, cause to be prepared and laid before the Company at the first Shareholders meeting after they have been approved by the board those annual financial statements and reports and group annual financial statements and reports, if any.
7.2.4
The Company must submit the management accounts and other operational accounts to the Board on a quarterly basis.
7.2.5
Subject to the provisions of the Act, a copy of the annual financial statements and reports referred to in clause 7.2.3 must be delivered or sent by post to the registered address of each shareholder and debt instrument holder at least ten business days before the first Shareholders meeting after they have been approved by the board. A Shareholder or debt Instrument holder may give the Company an address for the purposes of receiving electronic communications, in which case a copy of such documents may be delivered electronically to that Shareholder or debt instrument holder at that address. This clause 7.2.5 does not require the Company to send or deliver a copy of such documents to any person who is not entitled to receive notice of general meetings of the Company or whose address the Company is not aware of, or to more than any one of the joint holders of any securities.
7.3
Company or subsidiary acquiring Shares

Subject to section 48(8) of the Act the Company's board may not authorise the acquisition by the Company of its own Shares, nor the acquisition by a subsidiary of its Shares, in each case as contemplated in section 48, without first obtaining the approval of the Shareholders by way of an ordinary resolution. Any such approval may be in the form of a general authority to the board, whether conditional or unconditional, to acquire Shares in their discretion, or in the form of a specific authority in respect of any particular acquisition of Shares. If any such approval is given in the form of a general authority to the board, it shall be valid only for a period of 12 months, but it may be varied or revoked by any general meeting of the Company prior to the expiry of the 12 month period.

7.4
Winding-up
7.4.1
If the Company is wound-up, the liquidator may with the sanction of a special resolution of the Shareholders, distribute among the Shareholders in specie the whole or any part of the assets of the Company and the liquidator may for such purpose set a value that the liquidator deems fair upon any asset and may determine how the distribution will be carried out as between the Shareholders or different classes of Shareholders. The liquidator may, after discharging all liabilities and with like sanction, vest the whole or any part of such assets upon trustees to be held in trust for the benefit of the Shareholders or any of them as the liquidator deems fit.

 

 

95


 

 

 

7.4.2
This Memorandum of Incorporation was adopted by special resolution by Shareholders acting other than at a meeting in terms of section 60.

 

96


 

 

 

 

Appendix 5

 

 

Share Terms

 

PART A — ORDINARY SHARES

 

 

1.
Each issued Ordinary Share shall, prior to the Conversion Date, rank pari passu with all other Ordinary Shares and A Ordinary Shares in respect of all rights, and entitles its holder to:
1.1
vote on any matter to be decided by the holders of Ordinary Shares and A Ordinary Shares (other than matters which are, in terms of the MOI or the Act, to be decided solely by the holders of any other class/es of shares/s or securities) and to exercise 1 (one) vote in respect thereof;
1.2
participate equally with (i) every other Ordinary Share and (ii) every other A Ordinary Share in their respective Relevant Proportions, in any Distribution, whether during the existence of the Company or upon its winding up or dissolution and which, for the avoidance of doubt, shall be determined after the declaration any payment of any Distribution to the holders of A Ordinary Shares; and
1.3
participate equally with (i) every other Ordinary Share and (ii) every other A Ordinary Share, in their respective Relevant Proportions, in the net assets of the Company upon its liquidation after any such Distribution to the holders of A Ordinary Shares and which, for the avoidance of doubt, shall be determined after the payment of any such Distribution to the holders of A Ordinary Shares.
2.
Each issued Ordinary Share shall, from the Conversion Date, rank pari passu with all other Ordinary Shares in respect of all rights, and entitles its holder to:
2.1
vote on any matter to be decided by the holders of Ordinary Shares and to exercise 1 (one) vote in respect thereof;
2.2
participate equally with every other Ordinary Share, in any Distribution, whether during the existence of the Company or upon its winding up or dissolution; and
2.3
participate equally with every other Ordinary Share in the net assets of the Company upon its liquidation.

 

97


 

 

 

PART B — A ORDINARY SHARES

3.
Save for as otherwise set out herein, each issued A Ordinary Share ranks pari passu with and has all of the rights and privileges attaching to the Ordinary Shares, and entitles the holder to:
3.1
Vote on all matters upon which, and in all circumstances in which, the holders of Ordinary Shares are entitled to vote;
3.2
exercise such number of votes on any matter to be decided on by the holders of Ordinary Shares and A Ordinary Shares collectively as constitutes 5,5% of the votes exercisable by the holders of A Ordinary Shares and Ordinary Shares collectively, divided by the aggregate number of A Ordinary Shares in issue at that time.
3.3
participate with every other A Ordinary Share and Ordinary Share in any Distribution each and every time a Distribution is made to the holders of Ordinary Shares as to 5,5% of the relevant Distribution at that time divided by the aggregate number of A Ordinary Shares and Ordinary Shares in issue at that time.
3.4
participate with every other Ordinary Share and A Ordinary Share in the net assets of the Company upon its liquidation as to 5,5% thereof divided by the aggregate number of A Ordinary Shares and Ordinary Shares in issue by the Company at that time.
4.
On the Conversion Date, the A Ordinary Shares shall automatically covert into such number of Ordinary Shares as will constitute 5.5% of the entire issued Ordinary Shares immediately after their issue. The Company shall, on the Conversion Date, deliver the share certificates evidencing the Conversion Shares to the A Ordinary Shareholder, cancel the share certificates evidencing the A Ordinary Shares and update the securities register of the Company to record the conversion and subsequent cancellation of the A Ordinary Shares and the issue of the Conversion Shares to, and the A Ordinary Shareholder the holder of the Conversion Shares.
5.
For purposes of this Appendix I:
5.1
"Conversion Date" means 31 December 2025;
5.2
"Conversion Shares" means that number of Ordinary Shares as will constitute 5.5% of the entire issued Ordinary Shares immediately after their issue, and to be issued to the holder of A Ordinary Shares on the Conversion Date; and
5.3
"Relevant Proportions" means 5.5% in respect of all of the A Ordinary Shares and 94.5% in respect of all the Ordinary Shares.

 

98


EXHIBIT 31.1

CERTIFICATION PURSUANT TO

SECURITIES EXCHANGE ACT RULES 13a-14(a) AND 15d-14(a)

AS ADOPTED PURSUANT TO

SECTION 302 OF THE SARBANES-OXLEY ACT OF 2002

I, Paul E. Mann, certify that:

1.
I have reviewed this Quarterly Report on Form 10-Q for the period ended September 30, 2026 of ASP Isotopes Inc.;
2.
Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
3.
Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4.
The registrant’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:
a)
designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
b)
designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
c)
evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
d)
disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting; and
5.
The registrant’s other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a)
all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b)
any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.

 

Date: November 16, 2026

 

/s/ Paul E. Mann

 

 

 

Paul E. Mann

 

 

 

Chief Executive Officer
(principal executive officer)

 

 

 


EXHIBIT 31.2

CERTIFICATION PURSUANT TO

SECURITIES EXCHANGE ACT RULES 13a-14(a) AND 15d-14(a)

AS ADOPTED PURSUANT TO

SECTION 302 OF THE SARBANES-OXLEY ACT OF 2002

I, Heather Kiessling, certify that:

1.
I have reviewed this Quarterly Report on Form 10-Q for the period ended September 30, 2026 of ASP Isotopes Inc.;
2.
Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
3.
Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4.
The registrant’s other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the registrant and have:
a)
designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;
b)
designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;
c)
evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
d)
disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant’s internal control over financial reporting; and
5.
The registrant’s other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a)
all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b)
any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control over financial reporting.

 

Date: November 16, 2026

 

/s/ Heather Kiessling

 

 

 

Heather Kiessling

 

 

 

Chief Financial Officer

 

 

 

(principal financial officer and principal accounting officer)

 

 

 


EXHIBIT 32.1

CERTIFICATION PURSUANT TO SECTION 1350, AS ADOPTED PURSUANT TO

SECTION 906 OF THE SARBANES-OXLEY ACT OF 2002

In connection with the Quarterly Report of ASP Isotopes Inc. (the “Corporation”) on Form 10-Q for the fiscal quarter ended September 30, 2026, as filed with the Securities and Exchange Commission on the date hereof (the “Report”), I, Paul E. Mann, as Chief Executive Officer of the Corporation, and I, Heather Kiessling, as Chief Financial Officer of the Corporation, certify, pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, that to my knowledge:

(1)
The Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and
(2)
The information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Corporation.

 

Date: November 16, 2026

By:

/s/ Paul E. Mann

 

 

 

Paul E. Mann

Chief Executive Officer

 

 

 

(Principal Executive Officer)

 

 

Date: November 16, 2026

By:

/s/ Heather Kiessling

 

 

 

Heather Kiessling

Chief Financial Officer

 

 

 

(Principal Financial Officer)

 

 

This certification shall not be deemed “filed” for purposes of Section 18 of the Exchange Act or otherwise subject to the liability of Section 18 of the Exchange Act. Such certification shall not be deemed to be incorporated by reference into any filing under the Securities Act of 1933, as amended, or the Exchange Act, except to the extent that the Corporation specifically incorporates it by reference.

 


Ex 99.1

Risks Related to Renergen

Unless the context otherwise requires, references in this section under the heading “Risks Related to Renergen” to “Renergen” refer to Renergen Limited and its subsidiaries. The following risk factors relating to Renergen are organized under the sub-headings below.

Risks Related to Renergen’s Limited Operating History, Financial Position and Need for Additional Capital

Renergen has a limited operating history, which makes it difficult to evaluate its business and prospects, and Renergen is susceptible to the difficulties associated with rapid growth and expansion.

Renergen’s LNG and helium extraction business has a limited operating history. Renergen has produced LNG since September 2022, although production remains below nameplate capacity. Its helium liquefaction system, first commissioned in January 2023, has not yet achieved sustained production. Operational challenges, including a leak in the helium cold box, required the system to be taken offline for repair. Subsequent to repair an initial test batch confirmed product quality in February 2025, the system was shut down while Renergen focused on drilling to increase gas supply to the facility. LNG production was also adversely affected during fiscal year 2026 by vertical seismic profile activities conducted on high-flow wells, a three-month plant outage resulting from compressor failures, and carbon dioxide spikes that required gas venting, which collectively contributed to a decline in average daily LNG production to approximately 10.65 tons per day in fiscal year 2026 from 13.38 tons per day in the prior year, well below the facility’s nameplate capacity. The helium system’s efficiency depends on feed gas volumes and is expected to improve progressively as additional feedstock is introduced, until the facility reaches nameplate capacity. While, in August 2026, Renergen recommenced commissioning of the helium system in anticipation of reaching nameplate production in the fourth quarter of calendar year 2026, there is no guarantee that such operational challenges will not occur in the future. As a result, there is only limited historical financial and operating information upon which to evaluate Renergen’s performance, and the results from its current producing wells are not necessarily indicative of the results of future drilling. In addition, Renergen expects to grow rapidly over the next several years, and its success will depend on its ability to manage that growth and the increased demands on management, including increased administrative burden, capital requirements and organizational challenges common to large, capital-intensive operations. Renergen’s operating results could be adversely affected if it does not successfully manage these difficulties.

Renergen will require substantial additional capital to fund its operations and the development of Phase 2 of the Virginia Gas Project, which may not be available on acceptable terms, or at all.

Renergen will require substantial additional capital over a prolonged period to fund its operations, its multi-year drilling program and the development of Phase 2 of the Virginia Gas Project, the build cost of which is expected to be funded in significant part with senior secured debt. Renergen may not be able to raise or generate the capital required to do so on acceptable terms, or at all, and any inability to obtain needed financing could require Renergen to delay, curtail or abandon development activities. Any of the foregoing could have a material adverse effect on Renergen’s business, financial condition and results of operations.

Risks Related to the Expansion of the Virginia Gas Project

As Renergen further expands its current operations into Phase 2, Renergen may face additional problems associated with natural gas exploration and development projects.

Renergen’s ability to sustain or increase levels of helium and LNG production is dependent in part on the successful expansion of Renergen’s operations, including the development of the Virginia Gas Project. The development of a natural gas facility takes a number of years to complete and requires substantial capital

1

 


investment. The economic feasibility of such projects is based upon many factors, including, among others: the accuracy of reserve estimates; helium and LNG recoveries; sufficient quality and/or quantity of feed gas; capital and operating costs; government regulations relating to prices, taxes, royalties, land tenure, land use, importing, exporting and environmental protection; and helium and LNG commodity prices. Projects to replace existing capacity or expansions are also subject to the successful completion of feasibility studies, the issuance of necessary governmental permits and the availability of adequate financing. If Renergen is unable to execute such projects successfully, Renergen could face problems such as delays, cost overruns and lower than predicted revenues, which could have an adverse effect on Renergen’s business, financial condition and results of operations.

In addition, Renergen’s management is conducting an ongoing plant design optimization review for Phase 2, and the overall project scope, size, design, sequencing, production capacity, product mix and timeline may differ materially from the original design parameters. As part of that review, Phase 2 may be constructed in a phased expansion rather than as a single unit, which could extend the development timeline. The optimization review is being informed by, among other things, current global helium market conditions and supply disruptions, evolving local energy demand, and the expected availability of equity and debt financing. As a result, the actual Phase 2 development plan, once finalized, may differ significantly from prior estimates and investor expectations regarding the project’s scale, cost and timeline.

Renergen has several additional supporting authorizations, licenses and permits to obtain before Phase 2 of the Virginia Gas Project is considered fully permitted, which Renergen may not timely obtain or obtain at all.

Renergen has several additional supporting authorizations to obtain before Phase 2 of the Virginia Gas Project is considered fully permitted. Renergen may have difficulty obtaining these required authorizations, permits and licenses for the operation of Phase 2. These permits, licenses and approvals are issued by ministries and/or agencies of the South African government and are crucial to the success of Phase 2. Although Renergen has applied for all consents necessary to conduct Renergen’s business to date, there can be no assurance that Renergen will obtain, retain, timely renew or comply with all of the terms and conditions attaching to such consents, which could delay Renergen’s progress or curtail some of Renergen’s plans entirely.

Renergen’s overall cost to complete construction of Phase 2 is an estimate based on assumptions that may be inaccurate and are based on existing economic and operating conditions that may change in the future. If actual costs are materially greater than Renergen’s estimates, Renergen’s business, financial condition and results of operations may be negatively impacted.

The estimate of the overall build cost to complete development, permitting and financing of Phase 2 as currently designed is in excess of $1.0 billion (including borrowing costs and general corporate costs during construction). This estimate is based on assumptions that may be inaccurate and existing economic and operating conditions that may change in the future, which could materially and adversely affect the cost of construction beyond Renergen’s estimates. In addition, Renergen’s management is conducting an ongoing plant design optimization review for Phase 2, and the overall project scope, size, design sequencing, production capacity, product mix and timeline may differ materially from the original design parameters. As part of that review, Phase 2 may be constructed in a phased expansion rather than as a single unit, which could extend the development timeline. The cost of construction could change for a variety of reasons including, but not limited to, increased labor costs, increased energy costs and cost overruns. Furthermore, the world economy is facing the risk of increasingly high inflation as a result of, among other things, continued supply constraints with rising demand and increased energy prices. This sharp rise in inflation has created pressure on economies and their central banks to reconsider accommodative and expansionary monetary policies, resulting in higher interest rates and associated monetary policy aimed at reducing excess liquidity in the market. The current levels of inflation in South Africa, and globally, may prevent comparison between the development of Phase 1 and the development of Phase 2, as the costs of goods and services used in the development of Phase 1 may not correlate with the costs of goods and services used for the development of Phase 2, making it difficult to predict the cost of materials and the price of labor needed to complete the construction of Phase 2. Additionally, high rates of inflation may curtail Renergen’s ability to access international financial markets and may lead to further government intervention in the economy, which may introduce government policies that may materially and adversely affect Renergen and constrain Renergen’s ability to purchase the materials or hire the labor required to complete the development of Phase 2. If the actual costs of

2

 


construction are materially greater than Renergen’s estimates, Renergen’s business, financial condition and results of operations will be negatively impacted.

There can be no assurance that Renergen will be able to obtain the necessary financing for Phase 2 in a timely manner and/or on acceptable terms, if at all.

Renergen has received conditional approval for senior secured debt funding from the DFC of up to $535 million. In addition, the Standard Bank of South Africa has previously indicated its willingness to consider supporting Phase 2 of the Virginia Gas Project with up to $250 million of senior secured debt funding. No binding definitive agreements have been executed with respect to either facility, and there can be no assurances that Renergen will be able to negotiate and enter into such agreements on terms that are favorable to Renergen, or at all. In addition, the Commitment Letter is non-binding and subject to a number of terms and conditions, contingencies and uncertainties, which we may not be able to satisfy, or may need to renegotiate, and there is no guarantee that the DFC would be willing to reach terms favorable to us, or at all. See “Renergen Management's Discussion and Analysis of Financial Condition and Results of Operations-Indebtedness-Conditional Indications of Support from the DFC and SBSA” for additional information regarding conditions precedent to funding by the DFC. The proposed facilities are expected to be interdependent, with the full funding package required to be in place through binding definitive agreements before any drawdown under either facility.

If Renergen is unable to fund Renergen’s planned capital expenditure for Renergen’s projects as a result of, among other factors, difficulties in raising funding to support future capital expenditures and investments, Renergen may no longer be able to complete capital projects. In addition, Renergen may be unable to develop new capital projects so as to continue production at cost-effective levels. Renergen’s capital expenditures financed by borrowing additional funds may increase Renergen’s leverage and make it more difficult for Renergen to satisfy Renergen’s obligations, limit Renergen’s ability to obtain additional financing to operate Renergen’s business, and require Renergen to dedicate a substantial portion of Renergen’s cash flow to payments on Renergen’s debt, which may reduce Renergen’s ability to use Renergen’s cash flow to fund working capital, capital expenditures and other general corporate requirements, and place Renergen at a competitive disadvantage relative to some of Renergen’s competitors that have less debt.

Managing a project as substantial in size as Phase 2 of the Virginia Gas Project requires sufficient technical, commercial and project management capacity and there can be no assurance that Renergen’s current management team has sufficient capacity.

Successful implementation of Phase 2 of the Virginia Gas Project requires sufficient technical, commercial and project management capacity. As part of the execution strategy for Phase 2, Renergen has retained Worley, a global engineering entity, WorleyParsons Limited, to act as engineer to ensure sufficient skill set, experience, management capability and resources are available to Renergen for the execution of Phase 2 of the Virginia Gas Project. The scope of the owners engineer’s work and its execution will be overseen by Renergen’s management team. However, there can be no assurance that Renergen’s current management team has sufficient capacity, or that it can acquire additional skills to supplement that capacity, to manage a project of this scale and to realize cost and operational efficiencies throughout Phase 2 or maintain those at the existing operations.

Even if Phase 2 is completed, the project may not operate as expected or may cost more to operate than expected.

Renergen categorizes Phase 2 as the expansion of its existing, authorized operations through the drilling of additional wells, the construction of additional natural gas gathering pipelines and the construction of a significantly larger (approximately 12x larger) processing and liquefaction facility, and the associated road tanker distribution facilities and downstream customer dispensing facilities. Phase 2 is a major undertaking and Renergen may encounter unexpected obstacles in the future, such as inflationary pressures, rising interest rates and associated monetary policy and increasing power shortages or blackouts, that were not present during the construction of Phase 1 and that Renergen cannot overcome within budget, within Renergen’s expected timeframe, or at all. In addition, as part of its ongoing plant design optimization review, Renergen may construct Phase 2 in a phased expansion rather than as a single unit, which Renergen’s management believes may allow for more flexible development and potentially accelerate early-stage cash flows, but which could also extend the overall development timeline and alter

3

 


project economics. Even if Phase 2 is completed, the project may not operate as expected or may cost more to operate than expected. Renergen’s results of operations and financial condition are, to a large extent, dependent upon the overall success of Phase 2. Accordingly, any changes in the expected operation or cost of operation of the projects in Phase 2 may adversely impact Renergen’s results of operations and financial condition.

The construction and operation of gas gathering pipelines may pose unforeseen difficulties, delays or costs, which could impact Renergen’s profitability and cause a delay in Renergen’s operations.

The development of the Virginia Gas Project includes construction, and ultimately operation, of low-pressure well-site gathering pipelines that deliver production to a liquefaction facility. The construction and operation of the gathering pipelines poses a number of risks, including risks related to:

•
design flaws in the pipeline infrastructure;
•
technical vulnerabilities in information systems that are used to manage and control the flow of gas;
•
delays in construction caused by third-party providers or contractors or delays in obtaining necessary permits, authorizations or licenses for construction or operation of the pipelines;
•
improper installation techniques, material defects, and/or environmental factors resulting in corrosion or material fatigue that could impact ongoing pipeline operations;
•
delays caused by Renergen’s lack of ownership of the land on which Renergen will own Renergen’s pipelines;
•
inadequate maintenance and quality management, which may affect overall performance, recoverability and efficiency;
•
costs and liabilities resulting from performance of pipeline integrity testing programs and related repairs;
•
construction and operating cost overruns that cannot be passed on to the customer;
•
unforeseen plant outages;
•
inability to access gas gathering infrastructure due to abnormally inclement weather or other unforeseen circumstances;
•
damage to Renergen’s pipelines and other facilities due to climatic events and severe weather;
•
production variability or system disruptions;
•
theft or vandalism of wellhead and/or pipeline infrastructure;
•
community protest, including protest caused by a perceived lack of local community participation in the project and permanent job opportunities for local residents; and
•
inability to deliver production due to a force majeure event or other unforeseen circumstances.

There is no assurance that Renergen will be able to execute future take-or-pay agreements with customers on favorable pricing terms, if at all.

Renergen’s results of operations depend on its ability to strategically execute offtake agreements with customers. Renergen expects to contract the majority of the LNG it produces on five- to eight-year take-or-pay agreements, servicing the industrial, logistics and potentially gas-to-power industries. There is no assurance that Renergen will be able to execute these agreements on favorable pricing terms, if at all. If Renergen is unable to negotiate these contracts, or is unable to secure favorable prices and terms, Renergen’s business, financial condition, results of operation and prospects could be adversely affected.

Renergen has been unable in the past, and may be unable to meet in the future, its delivery obligations under Renergen’s existing take-or-pay offtake agreements, which contain minimum volume commitments. Any failure by Renergen to satisfy the minimum volume commitments could lead to contractual penalties that could adversely affect Renergen’s results of operations and financial position.

Renergen has entered into multi-year take-or-pay offtake agreements for the sale of LNG and liquid helium produced at the Virginia Gas Project. Under these agreements, Renergen is obligated to make contracted volumes available for delivery to Renergen’s customers on a periodic basis, and Renergen’s customers are correspondingly obligated to purchase minimum volumes or pay for volumes not taken. If Renergen fails to make the contracted volumes available, Renergen’s customers may have the right to source alternative supply at Renergen’s expense,

4

 


reduce or suspend their payment obligations, seek contractual damages, or terminate their agreements with Renergen. Renergen’s ability to fulfill its delivery obligations depends on a number of factors, many of which are partially or entirely beyond its control, including, the successful completion and tie-in of additional production wells, reliable operation of the processing plant, and adequate gas gathering infrastructure, flow rates, reservoir conditions, Renergen’s ability to expand production capacity and drill additional wells. Furthermore, delays in the procurement, delivery, or commissioning of such equipment, whether due to supply chain disruptions, manufacturing delays, or logistical constraints, could impair Renergen’s ability to achieve or maintain production levels sufficient to satisfy Renergen’s delivery commitments.

If Renergen fails to meet Renergen’s delivery obligations, Renergen could experience a loss of revenue from contracted volumes, exposure to contractual damages or penalty provisions, an obligation to reimburse customers for the cost of procuring alternative supply, and the potential termination of one or more offtake agreements. The loss of key customers or a pattern of delivery shortfalls could also damage Renergen’s reputation and impair Renergen’s ability to negotiate favorable terms in future offtake agreements. A material failure to meet delivery commitments, or the termination of significant offtake agreements, could adversely affect Renergen’s ability to obtain or maintain project financing and could trigger defaults or covenant breaches under Renergen’s existing credit facilities, which could in turn result in acceleration of outstanding indebtedness. Furthermore, under the take-or-pay structure of Renergen’s agreements, Renergen’s customers' payment obligations are generally contingent upon Renergen’s making the contracted volumes available for delivery. If Renergen is unable to make volumes available due to production shortfalls or operational disruptions, Renergen’s customers' take-or-pay obligations may be reduced or suspended, resulting in lower-than-expected revenue even in periods when market demand for Renergen’s products remains strong. This asymmetry could materially and adversely affect Renergen’s results of operations, financial condition, cash flows, and ability to fund the continued development of the Virginia Gas Project. For information concerning our delivery commitments, see “Renergen Management's Discussion and Analysis of Financial Condition and Results of Operations-Components of Results of Operations.”

As Renergen’s customer contracts expire, Renergen may not be able to replace them with agreements on similar terms, or at all.

Certain helium and LNG contracts in Renergen’s portfolio will be subject to expiration. If the price of helium or LNG is declining at the time of negotiating a replacement contract, Renergen’s ability to negotiate or replace these contracts on terms that are acceptable to Renergen, or at all, may be adversely impacted. Renergen has a limited customer base and expects that a significant portion of Renergen’s future revenues will be from a limited number of customers, which could result in Renergen having less leverage in contract negotiations. Further, because of Renergen’s limited customer base, the loss of any significant customer could adversely affect Renergen’s operating results. Renergen cannot provide any assurance that Renergen will be able to negotiate or replace these contracts once they expire, and, even if Renergen is able to do so, Renergen cannot provide any assurance that Renergen will be able to obtain the same prices or terms it currently receives. If Renergen is unable to negotiate or replace these contracts, or is unable to secure prices and terms at least equal to the current prices and terms Renergen receives, Renergen’s business, financial condition, results of operation and prospects could be adversely affected.

Renergen may experience unforeseen difficulties, delays or costs in implementing Renergen’s business strategy and operational plan.

Renergen’s ability to grow Renergen’s business will depend on the successful implementation of Renergen’s existing and proposed strategic initiatives and current operational plans. The successful implementation of Renergen’s strategic initiatives and operational plans, including the realization of Renergen’s production growth, depends upon many factors, with some of such factors outside Renergen’s control. Renergen may prove unable to deliver on production targets. Unforeseen difficulties, delays or costs may adversely affect the successful implementation of Renergen’s business strategy and plans, and such strategy and plans may not result in the potential benefits. For example, a number of factors, including, but not limited to, operating costs, safety-related issues, organized labor action and technical issues may result in a failure to meet operations targets or strategic goals. Any such difficulties, delays or costs could prevent Renergen from fully implementing Renergen’s business strategy, which could have a material adverse effect on its business, operating results and financial condition.

5

 


Risks Related to Renergen’s Business

Because Renergen holds South Africa’s first and only onshore petroleum production right for the extraction and production of natural gas and helium and part of Renergen’s business strategy involves using some of the latest available slant well drilling and completion techniques, Renergen’s drilling results in South Africa may be more uncertain than drilling results in areas that are developed and have established production.

Renergen is a new producer of liquid helium and holds South Africa’s first and only onshore petroleum production right for the extraction and production of natural gas and helium. As a result, Renergen’s drilling results in South Africa may be more uncertain than drilling results in areas that are developed and have established production. Newer formations and areas have limited or no production history and, consequently, Renergen is more limited in assessing future drilling results in these areas. In addition, part of Renergen’s drilling strategy to maximize recoveries involves the drilling of slant wells, the locations of which are determined based on aeromagnetic and gravity surveys, re-processed seismics and data obtained from prior drilling campaigns. The difficulties Renergen faces drilling slant wells include: the fracturing of drill rods and rapid loss of inclination due to the intersection of softer rocks, which reduces the entry angle and decreases the probability of success. The difficulties Renergen faces while completing slant wells include: the loss of inclination that affects trajectory, the gravitational impact on centralization efforts, which can cause improper cement bonds and necessitate the insertion of additional migratory casings, and reductions in Renergen’s ability to log accurately, which reduces the quality of data received. Renergen’s experience with drilling slant wells in the area to date, as well as the industry’s drilling and production history in these formations, is limited. Since Renergen has limited drilling history, Renergen cannot assure you that all drilling prospects will be economically viable or that Renergen will not abandon its investments. Renergen cannot assure you that targeted well locations for prospects within Renergen’s area will be profitably developed, that wells drilled by Renergen in prospects that Renergen pursues will be productive or that Renergen will recover all or any portion of its investment in such unproved property or wells.

Renergen’s identified drilling locations are scheduled out over many years, making them susceptible to uncertainties that could materially alter the occurrence or timing of their drilling. In addition, Renergen may not be able to raise the substantial amount of capital that would be necessary to drill such locations.

Renergen’s management and technical teams have specifically identified and scheduled certain drilling locations as an estimation of Renergen’s future multi-year drilling activities. Renergen’s ability to drill and develop these locations depends on a number of uncertainties, including natural gas prices, the availability and cost of capital, drilling and production costs, availability of drilling services and equipment, drilling results, gathering system and pipeline transportation constraints, access to and availability of water sourcing and distribution systems, regulatory approvals and other factors. Because of these uncertain factors, Renergen does not know if the numerous drilling locations Renergen has identified will ever be drilled or if Renergen will be able to produce natural gas from these or any other drilling locations. As such, Renergen’s actual drilling activities may materially differ from those presently identified.

Renergen may be unable to drill many of Renergen’s identified locations. In addition, Renergen will require significant additional capital over a prolonged period in order to pursue the development of these locations, and Renergen may not be able to raise or generate the capital required to do so. Any drilling activities Renergen is able to conduct on these locations may not be successful, may not result in production or additions to Renergen’s estimated proved reserves and could result in a downward revision of Renergen’s estimated proved reserves, which could have a material adverse effect on Renergen’s future business and results of operations.

Renergen’s results of operations and financial condition are dependent upon the economic, environmental, social and political conditions in South Africa.

All of Renergen’s existing assets are in South Africa, and Renergen expects to complete construction projects and secure additional development projects in South Africa. As a result, the performance of Renergen’s operations is dependent upon the economic, environmental, social and political conditions in South Africa, and Renergen is exposed to a variety of risks, including risks related to:

•
heightened economic volatility;

6

 


•
difficulty in obtaining authorizations, permits and licenses required for the operation of Renergen’s projects and planned projects;
•
fluctuations in revenues, operating margins and/or other financial measures due to currency exchange rate fluctuations and restrictions on currency and earnings repatriation;
•
trade protection measures, import or export restrictions, licensing requirements and/or restrictive conditions, codes, norms and standards;
•
occupational safety, work hazards, and local labor laws and regulations;
•
potentially adverse tax developments or interpretations;
•
changes in political and/or social conditions;
•
fluctuations in the availability of funding;
•
changes in Renergen’s relationships with the different stakeholders in the communities surrounding Renergen’s facilities;
•
the proximity, cost, availability and capacity of natural gas and helium pipelines and other transportation facilities and equipment;
•
changes in the regulatory legal framework, including the costs of complying with environmental and energy regulations; and
•
consumer demand for lower-carbon forms of energy.

Renergen’s Virginia Gas Plant, located near Virginia in the Free State Province of South Africa, is subject to poor socio-economic conditions, which could hinder Renergen’s progress.

Renergen’s Virginia Gas Plant is located in the Free State Province of South Africa. South Africa’s unemployment rate was 33.6% in the second quarter of 2026. Poor socio-economic conditions in these communities increase expectations for employment from businesses operating in these communities and other socio-economic benefits. Historically, high unemployment rates contribute to social unrest. Furthermore, local governments and communities have demonstrated an increased reliance and growing expectations on energy companies to combat such unemployment, which may contribute to disruptions in operations due to community activism and lack of local delivery services. Renergen strives to employ from, and integrate, local communities where possible, and Renergen regularly engages and monitors Renergen’s interaction with local communities in which Renergen operates, including through community development programs with localized procurement opportunities; however, any such disruptions in Renergen’s operations due to community activism or social unrest may adversely affect Renergen.

Renergen uses third-party providers and contractors to conduct Renergen’s operations, and the lack of availability of, or failure to properly perform services by, one or more of these third-party providers or contractors may adversely affect Renergen.

The lack of availability of, or failure to properly perform services by, one or more of Renergen’s third-party providers or contractors could result in a decrease in Renergen’s production and/or delay the development of projects. A number of resources, such as compressors, liquefaction equipment, helium and cryogenic equipment and control systems, are only available through a limited number of third parties, and lead-times, work slowdowns, stoppages, or other labor- or services-related developments or disputes involving such third parties or contractors or their respective employees or services providers are out of Renergen’s control.

There can be no assurance that Renergen will be able to secure in a timely manner, or on commercially acceptable terms or at all the provision of all the services that Renergen will need to execute its business plans, or that such arrangements (both current and planned) will be sufficient for Renergen’s future needs and/or will not be interrupted. Renergen has previously entered into various Agreements of Mandatory, commonly known as Section 37(2) Agreements, which limit Renergen’s liability to third parties by placing the legal liability on the third-parties for acts or omissions undertaken by their employees. Renergen also requires all of its third-party service providers to be in good standing with a compensation fund in order to mitigate any potential liability Renergen may face in terms of the Compensation for Occupational Injuries and Diseases Act. However, Renergen cannot be certain that Renergen will not incur liability to third parties as a result of the actions of its contractors.

7

 


In addition, certain of the services Renergen requires are, or may in the future be, only available from a limited number of specialized providers, and Renergen may encounter difficulties in securing the services of specialized contractors due to high demand for those services. As a result, Renergen is dependent on external contractors performing and fulfilling their obligations satisfactorily. While Renergen is not aware of any specific failures or delays in providing such services, Renergen’s business and development plans may be adversely affected by any failure or delay by third parties in providing these services, by any change to the terms on which these services are made available, or by the failure of such third-party providers to provide services that meet Renergen’s quality or volume requirements. If Renergen determines it necessary to change a provider of such services, Renergen may experience additional costs, delays, interruptions to production, or other adverse effects on Renergen’s business, and Renergen may not be able to find adequate replacement services on commercially acceptable terms, on a timely basis, or at all. In addition, in connection with the proposed senior secured debt facilities that the DFC and the Standard Bank of South Africa have previously indicated their willingness to consider supporting for Phase 2, Renergen will be required to enter into business, construction and operational arrangements to deliver the Phase 2 facilities with suitably skilled contractor(s) to the satisfaction of the DFC and the Standard Bank of South Africa.

Renergen currently relies on outside contractors to perform key roles, such as drilling, downhole (wireline) logging and compositional sampling. Renergen will also rely on Worley to perform the owners engineer role on behalf of Renergen for Phase 2 of the Virginia Gas Project, and Renergen will rely on specialist Engineering, Procurement and Construction contractors for execution and construction of the Phase 2 plant. Renergen may also rely on specialized operating and maintenance contractors who are appointed for the short- to medium-term to assist with the operation of Renergen’s Phase 1 plant and the development of Renergen’s Phase 2 plant. These contractors will be selected based on international and, where possible, local experience. During the construction of Phase 2, Renergen also plans to appoint an independent consultant who must be registered with the South African Council for the Project and Construction Management Professions to oversee and audit Renergen’s OHSA implementation and Renergen’s third-party service providers. The success of Renergen’s operations and activities remains significantly dependent on the efforts, abilities and performance of outside contractors.

Should Renergen be unable to acquire or retain third-party providers or contractors of key services on favorable terms, or should there be interruptions to, or inadequacies with, any services provided, Renergen may need to incur additional capital and operating expenditures to perform or correct such services. The occurrence of one or more of these risks could have a material adverse effect on Renergen’s business, results of operations and financial condition.

All of Renergen’s operations are conducted in one geographic area. Any adverse developments at Renergen’s facility could have a material adverse effect on Renergen’s business, results of operations and financial condition.

Because all of Renergen’s operations are conducted in one geographic area located in Virginia, Free State Province, South Africa, an event such as an explosion, substantial gas leak, fire, equipment malfunction or severe weather conditions, including water shortages or other drought-related conditions, that adversely affect Renergen’s facility could significantly disrupt Renergen’s natural gas or helium production operations and Renergen’s ability to supply LNG and helium to Renergen’s customers. Additionally, as a result of this concentration, Renergen may be disproportionately exposed to the impact of regional supply and demand factors, delays or interruptions of production from wells in these areas caused by governmental regulation, processing or transportation capacity constraints, market limitations, availability of equipment and personnel, or interruption of the processing or transportation of natural gas. Any sustained disruption in Renergen’s ability to meet Renergen’s obligations under Renergen’s sales agreements could have a material adverse effect on Renergen’s business, results of operations and financial condition.

Renergen anticipates Renergen will require additional capital in the future, and no assurance can be given that such capital will be available at all or available on terms acceptable to Renergen.

Renergen expects its expenses to increase substantially in connection with our ongoing and planned activities, particularly as it continues to integrate acquired assets into Renergen and continues the development of Phase 2 of

8

 


the Virginia Gas Project. In addition, we expect to continue incurring significant costs associated with operating as a public company. For example, Renergen estimates that the build cost to complete construction of Phase 2 is in excess of $1.0 billion (including borrowing costs and general corporate costs during construction) over a period of three to four years. This is broken down into upstream, midstream and downstream costs. Historically, Renergen has financed these expenditures primarily with equity offerings. Renergen intends to use Renergen’s existing cash balance, available facilities and operating cash flows. However, the cost to complete construction of Phase 2 is subject to factors beyond Renergen’s control, including inflationary pressures, rising interest rates and associated monetary policies and increasing power shortages or blackouts, and Renergen’s financing needs may require Renergen to alter or increase Renergen’s capitalization substantially through the issuance of debt or equity securities or the sale of assets.

If Renergen is unable to fund Renergen’s planned capital expenditure projects as a result of Renergen’s operations being unable to generate sufficient cash flow or as a result of difficulties in raising debt or equity funding to support future capital expenditures and investments, Renergen may no longer be able to complete such projects. In addition, Renergen may be unable to develop new capital projects so as to continue production at cost-effective levels. Furthermore, any such reduction in Renergen’s ability to fund capital expenditures may result in significantly increased expenses to resume production or capital projects, or cause Renergen to forego resuming production or such capital projects at all, which could cause Renergen to forego any potential future increases in commodity prices and may adversely affect Renergen’s results of operations or financial condition.

Renergen’s capital expenditures financed by borrowing additional funds may increase Renergen’s leverage and make it more difficult for Renergen to satisfy Renergen’s obligations, limit Renergen’s ability to obtain additional financing to operate Renergen’s business, require Renergen to dedicate a substantial portion of Renergen’s cash flow to payments on Renergen’s debt and place Renergen at a competitive disadvantage relative to some of Renergen’s competitors. As of May 31, 2026, Renergen had total borrowings outstanding of $113.8 million, consisting of long-term borrowings from the DFC, IDC and Molopo Energy Limited (“Molopo”). The borrowings under the DFC Credit Facility Agreement (as defined below) and IDC Loan Agreement (as defined below) are payable on fixed payments terms, whereas the borrowings under the Molopo Debt Funding (as defined below), while payable in annual installments, are payable in an amount equivalent to 36% of Tetra4’s distributable profit, meaning the amount of Tetra4’s annual profit that is available to be paid as a dividend to its shareholders in a particular period. Renergen has received conditional approval for senior secured debt funding from the DFC of up to $535 million. In addition, the Standard Bank of South Africa has previously indicated their willingness to consider supporting Phase 2 with up to $250 million of senior secured debt funding. No binding definitive agreements have been executed with respect to either facility, and there can be no assurance that Renergen will be able to negotiate and enter into such agreements on terms that are favorable to Renergen, or at all. In addition, the Commitment Letter is non-binding and subject to a number of terms and conditions, contingencies and uncertainties. See “Renergen Management's Discussion and Analysis of Financial Condition and Results of Operations-Indebtedness-Conditional Indications of Support from the DFC and SBSA” for additional information regarding conditions precedent to funding by the DFC. If Renergen is unable to repay or refinance Renergen’s short- and long-term borrowings as they mature, such inability could have a material adverse effect on Renergen’s financial condition.

The DFC Credit Facility Agreement, IDC Loan Agreement and the Bridge Loan Facility Agreement contain, and Renergen’s existing and future debt and other agreements may contain, among other provisions, covenants that restrict Renergen’s ability to finance future operations or capital needs, engage in other business activities or declare dividends. Given the long-term nature of these agreements, these covenants and restrictions may present a material constraint on Renergen’s operational and strategic flexibility and may preclude Renergen from entering into strategic transactions that would be beneficial to Renergen. A breach of any of these covenants could result in an event of default or accelerate Renergen’s repayment obligations under the relevant agreement, and any such event of default or resulting acceleration under such agreements could result in an event of default or acceleration under other agreements.

Renergen’s capital expenditures financed by Renergen’s cash flow from operations and access to capital are subject to a number of variables, including the prices at which Renergen’s production is sold, Renergen’s proved reserves, the amount of LNG and helium Renergen is able to produce from existing wells, Renergen’s ability to locate and produce new reserves, the amount of Renergen’s operating expenses, Renergen’s borrowing ability and Renergen’s ability to access capital markets.

9

 


In addition, Renergen may have additional capital requirements to the extent Renergen identifies and decides to proceed or accelerate exploration activities, develop future operations, or take advantage of opportunities for acquisitions, joint ventures or other business opportunities. Renergen may also incur major unanticipated liabilities or expenses. There can be no assurance that Renergen will be able to obtain necessary financing for such activities in a timely manner and/or on acceptable terms, if at all.

Natural gas prices are volatile. A sustained decline in natural gas prices could adversely affect Renergen’s business, financial condition and results of operations and Renergen’s ability to meet Renergen’s capital expenditure obligations and financial commitments.

The prices Renergen receives for Renergen’s natural gas production heavily influence Renergen’s revenue, profitability, access to capital, and future rate of growth. Natural gas is a commodity, and its price may fluctuate widely in response to market uncertainty and to relatively minor changes in the supply of and demand for natural gas. Historically, natural gas prices have been volatile. For example, during the period from January 1, 2026 through June 30, 2026, the Henry Hub spot price for natural gas fluctuated significantly from a high of $30.72 per MMBtu on January 23, 2026 to a low of $2.54 per MMBtu on April 24, 2026. The prices Renergen receives for Renergen’s production, and the levels of Renergen’s production, depend on numerous factors beyond Renergen’s control, which include the following:

•
worldwide and regional economic conditions impacting the global supply and demand for natural gas;
•
the price and quantity of foreign imports of natural gas;
•
political and economic conditions in or affecting other producing regions or countries, including the Middle East, Africa, South America and Russia;
•
the level of global exploration, development and production of natural gas;
•
the level of global inventories of natural gas;
•
the proximity, capacity, cost and availability of gathering and transportation facilities;
•
localized and global supply and demand fundamentals and transportation availability;
•
the cost of exploring for, developing, producing and transporting reserves;
•
weather conditions and natural disasters;
•
technological advances affecting energy consumption;
•
the price and availability of alternative fuels;
•
expectations about future commodity prices;
•
energy supply, production, and conservation measures, including policies and initiatives by governmental authorities; and
•
governmental regulation and taxes.

Lower commodity prices may reduce Renergen’s cash flow and borrowing ability. If Renergen is unable to obtain needed capital or financing on satisfactory terms, Renergen’s ability to develop future reserves could be adversely affected. Also, using lower prices in estimating proved reserves may result in a reduction in proved reserve volumes due to economic limits. In addition, sustained periods with natural gas prices at levels lower than current Henry Hub strip prices may adversely affect Renergen’s drilling economics and Renergen’s ability to raise capital, which may require Renergen to re-evaluate and postpone or eliminate Renergen’s development program, and result in the reduction of some of Renergen’s proved undeveloped, probable and possible reserves and related PV-10. As a result, a substantial or extended decline in commodity prices may materially and adversely affect Renergen’s future business, financial condition, results of operations, liquidity and ability to finance planned capital expenditures.

The world’s helium supply is located in a few countries, which may cause volatility in helium prices, impact Renergen’s competition and affect Renergen’s business or results of operations.

Helium is a commodity business, which means that Renergen’s operations and earnings may be significantly affected by changes in helium prices and in margins on helium sales. Helium prices and margins on helium sales depend on local, regional and global events or conditions that affect supply and demand for helium. The world’s helium supply is located primarily in the United States, Algeria, and Qatar, in addition to South Africa, Russia and a few other countries. The scarcity of this resource limits the number of competitors in the helium industry and, if

10

 


Renergen’s competitors in any of these countries experience a problem with production of helium, the price of helium may spike. For example, an explosion at a Russian helium production facility in January 2022 caused a continued delay in production at that site and contributed to global helium supply concerns, which impacted the prices for the commodity. More recently, in early 2026, the closure of the Strait of Hormuz adversely impacted Qatar’s helium production, with repairs expected to take years rather than months, and in April 2026, Russia introduced export controls on helium to maintain domestic supply. Based on industry reports, approximately 50% of global helium supply is currently offline, while salt cavern storage facilities are approaching depletion. These developments have contributed to significant upward pressure on spot helium pricing, with spot prices exceeding $2,000/Mcf in some cases. However, there is no assurance that these conditions or elevated prices will be sustained, and helium prices could decline if such disruptions are resolved or if supply and demand conditions otherwise change. A resolution of disruptions, an increase in production or shipping capacity from producing countries, or a reduction in global demand could each cause helium prices to fall. Any material decline in helium prices could have a material adverse effect on certain of Renergen’s operations, especially in financial condition and proved reserves.

Scientific or technological changes, substitution, recycling or changes in end-user demand may reduce demand for helium, which could adversely affect Renergen’s business, financial condition and results of operations.

Helium demand may be affected by scientific and technological developments, changes in end-user demand, recycling, substitution of other gases or technologies, and the price sensitivity of certain helium applications. For example, technologies that reduce helium consumption in MRI machines, a shift in demand among electronics, aerospace, medical, fiber-optic, welding or other applications, or the development or increased use of substitutes for helium could reduce demand for Renergen’s helium. Significant increases in helium prices may also encourage customers to substitute other gases, increase investment in helium recycling or adopt technologies that reduce helium consumption. If demand for helium declines or if demand growth in emerging applications does not offset declines in other applications, Renergen’s business, financial condition, results of operations and prospects could be adversely affected.

Renergen faces competition based upon the international market price for LNG.

Renergen may be subject to the risk of LNG price competition when Renergen needs to replace any existing sale purchase agreement (“SPA”), whether due to natural expiration, default or otherwise, or enter into new LNG SPAs. Factors relating to competition may prevent Renergen from entering into a new or replacement SPA on economically comparable terms as existing SPAs, or at all. Such an event could have a material adverse effect on Renergen’s business, contracts, financial condition, operating results, cash flow, liquidity and prospects. Factors that may negatively affect potential demand for LNG from Renergen’s liquefaction projects are diverse and include, among others:

•
increases in worldwide LNG production capacity and availability of LNG for market supply;
•
LNG demand at levels below those required to maintain current price equilibrium with respect to supply;
•
increases in the cost to supply natural gas feedstock to Renergen’s liquefaction projects;
•
decreases in the cost of competing sources of natural gas or alternate fuels, such as coal, heavy fuel oil and diesel;
•
decreases in the price of non-South African LNG, including decreases in price as a result of contracts indexed to lower oil prices;
•
increases in capacity and utilization of nuclear power and related facilities; and
•
displacement of LNG by pipeline natural gas or alternate fuels, including in locations where access to these energy sources is not currently available.

Actual and potential supply chain shortages and increases in the prices of production inputs may have a material adverse effect on Renergen as Renergen expands its current operations.

Renergen’s results of operations have been and may in the future be affected by the availability and pricing of raw materials and other essential production inputs, including equipment, fuel and steel. The price and quality of raw materials have been and may in the future be substantially affected by changes in global supply and demand, along with weather conditions, including those due to climate change, governmental controls and other factors. A

11

 


sustained interruption in the supply of any of these materials could require Renergen to find substitute suppliers and to pay higher prices for such materials. Furthermore, the cost of construction materials and the prices of certain of Renergen’s production inputs are impacted by, among other things, the prices of such raw materials, including oil and steel, which have been, and may continue to be, subject to price volatility. The price of these materials may continue to rise as a result of inflation, resulting in significantly higher construction costs as Renergen expands its current operations into Phase 2. Any significant increase in the prices of these materials could increase Renergen’s operating costs and affect production considerations, which may have a material adverse effect on Renergen’s operations and liquidity.

Renergen depends on third parties to manufacture and to supply key semiconductor components necessary for operations at the Virginia Gas Plant. If these third-party suppliers become unwilling or unable to provide an adequate supply of semiconductors, with respect to which there is a global shortage, Renergen may not be able to find alternative sources in a timely manner and Renergen’s business could be adversely impacted.

Semiconductors are a vital input to certain components of Renergen’s Virginia Gas Plant. Many of the key semiconductors used in these components come from limited or single sources of supply, and, therefore, a disruption with any one manufacturer or supplier in Renergen’s supply chain would have an adverse effect on Renergen’s ability to continue Renergen’s operations. Due to Renergen’s reliance on these semiconductors, Renergen is subject to the risk of shortages and long lead times in their supply. Renergen has in the past experienced, and may in the future experience, semiconductor shortages, and the availability and cost of these components would be difficult to predict. For example, a global shortage of semiconductors has been reported since early 2021, and Renergen is unsure as to when, or if, such shortage will be resolved. To the extent such shortage persists, Renergen’s business could be adversely impacted. Additionally, Renergen’s manufacturers may experience temporary or permanent disruptions in their manufacturing operations due to equipment breakdowns, labor strikes or shortages, natural disasters, component or material shortages, cost increases, acquisitions, insolvency, changes in legal or regulatory requirements, or other similar problems, further exacerbating the global shortage. The shortage of semiconductors could negatively impact Renergen’s ability to source an adequate supply of semiconductors used in Renergen’s operations, which may adversely affect Renergen’s business, results of operations and financial condition.

The ongoing military conflict between Russia and Ukraine and the United States-Israel-Iran conflict could have a material adverse effect on the global energy industry and Renergen’s business, financial condition and results of operations.

The current conflict between the United States, Israel and Iran has highlighted the global dependency on the supply of petroleum, natural gas and helium from countries bordering the Perian Gulf. Not only has this conflict highlighted the concentration of suppliers, but more importantly the concentration of risk associated with transport routes to market for these critical products.

In addition, in response to the Russian invasion of Ukraine in February 2022, the United States, the European Union and the United Kingdom, among others, have imposed export controls on certain products and financial and economic sanctions on certain industry sectors and parties in Russia (for example, Helium). Although Renergen has no operations in Russia or Ukraine, Renergen has experienced shortages in materials and increased costs for transportation, energy, and raw materials due in part to the negative impact of the Russia-Ukraine military conflict on the global economy. The long-term impact on Renergen’s business resulting from the disruption of trade in the region caused by the conflict and associated sanctions is uncertain at this time due to the fluid nature of the ongoing military conflict and response. The potential impacts include supply chain and logistics disruptions, financial impacts including volatility in foreign exchange and interest rates, increased inflationary pressure on raw materials and energy, and other risks, including an elevated risk of cybersecurity threats and the potential for further sanctions.

The continuation of the abovementioned conflicts may trigger a series of additional economic and other sanctions enacted by the United States and other countries. The potential impact of supply chain and logistics disruptions, financial impacts, including volatility in helium and LNG prices, foreign exchange rates and interest rates, inflationary pressures on raw materials and energy and heightened cybersecurity threats, is uncertain at the current time due to the fluid nature of the conflict and international responses to it. To the extent any international conflict may adversely affect Renergen’s business, it may also have the effect of heightening many of the other risks

12

 


described in Renergen’s risk factors, such as those relating to data security, supply chain, volatility in prices of inputs, and market conditions, any of which could negatively affect Renergen’s business and financial condition.

Although Renergen monitors developments in international relations to assess any potential future impacts that may arise, Renergen cannot provide assurance that Renergen will not be impacted by any current or future international conflict. The adverse effects of the ongoing conflict between Russia and Ukraine and the United Staes, Israel and Iran, and/or economic sanctions and import and/or export controls to be imposed on the Russian and Iranian governments by the United States or others, and the above-mentioned adverse effect on the global economy and market conditions could have a material adverse effect on Renergen’s business, financial condition and results of operations.

Renergen may be unable to obtain, maintain or renew permits, leases or licenses necessary for Renergen’s operations, the failure of which could impair Renergen’s ability to conduct Renergen’s operations and have a material adverse effect on Renergen’s results of operations.

Renergen’s operations require Renergen to obtain a number of consents, permits, authorizations, leases and licenses that may impose strict regulations on various environmental and operational matters. These include consents issued by various agencies and regulatory bodies. The permitting rules, and the interpretations of these rules, are complex, change frequently and are subject to discretionary interpretations by Renergen’s regulators, all of which may make compliance difficult or impractical and may impair Renergen’s existing operations or the development of future facilities. Although Renergen believes that Renergen has obtained all consents, permits, authorizations, leases and licenses to operate Renergen’s operations to date, if any consents, permits, authorizations, leases and licenses that may be required for future operations are not issued or timely renewed as statutorily prescribed or at all, or are conditioned in a manner that may restrict Renergen’s ability to conduct Renergen’s operations economically, Renergen’s cash flows may decline, which could negatively impact Renergen’s operations and results of operations.

Renergen’s results of operations may be adversely affected by permitting, operating or construction delays and requirements introduced via community, political or regulatory opposition to Renergen’s projects.

Certain persons, associations and groups could oppose natural gas or helium projects in general or Renergen’s projects specifically, citing, for example, misuse of water resources, contribution to climate change, landscape degradation, land use or price increase and harm to the environment. Moreover, regulation may restrict the development of LNG or helium plants in certain areas. In order to develop an LNG or helium project, Renergen is typically required to obtain, among other things, petroleum rights to explore and/or produce LNG and helium, environmental authorizations, water use entitlements, and/or other related authorizations, land use, zoning and/or other infrastructure-related building permits, which in turn require environmental impact and applicable specialist studies to be undertaken and mandatory prescribed public participation processes, during which any interested or affected individual, association or group may oppose a project or expansion of an existing project. Any objection resulting from the public participation process must be taken into account by the relevant decision-making authority, which could in turn result in the applicable consents being delayed or not being granted or being granted solely on the condition that Renergen carry out certain mitigation measures regarding the impact of the proposed project. Objections to Renergen’s application for the relevant consents, successful appeal and/or judicial review challenges in respect to the granting of Renergen’s applicable consents could adversely affect Renergen’s operating plans.

Authorization for the use, construction, and operation of systems and associated transmission facilities will also require the assessment and evaluation of existing limited real rights of third parties, such as mineral rights, private rights-of-way, and other easements; environmental, agricultural, traditional community entitlements, cultural, recreational, and aesthetic impacts; biodiversity loss, and the likely mitigation of adverse effects to these and other resources and uses. The inability to obtain the required consents and other governmental approvals, and any delays in obtaining such consents and other related approvals due, for example, to applicant or third-party internal appeals and litigation, could potentially prevent Renergen from successfully constructing and operating such projects in a timely manner and could result in the potential forfeiture of any deposit Renergen has made with respect to a given project. Moreover, project approvals subject to project modifications and conditions, including mitigation requirements and costs, could affect the financial success of a given project. Changing regulatory

13

 


requirements and the discovery of unknown site conditions could also adversely affect the financial success of a given project.

Further, Renergen may be adversely affected by operating or construction delays. Due to the size and duration of construction in Phase 2, actual construction costs may be significantly higher than Renergen’s current estimates as a result of many factors, including but not limited to changes in scope, the ability of Renergen’s contractors to execute successfully under their agreements, changes in commodity prices, escalating labor costs and the potential need for additional funds to be expended to maintain construction schedules or comply with existing or future environmental or other regulations. As construction progresses, Renergen may decide or be forced to alter operations or Renergen’s construction plans due to unforeseen events, which could result in longer construction periods, higher construction costs or both, including change orders to comply with existing or future environmental or other regulations. For example, Renergen’s Phase 1 liquid helium plant has undergone engineering optimization and entered its commissioning phase in August 2026, with commercial liquid helium delivery expected during the fourth quarter of 2026. Unanticipated technical issues during commissioning could cause further delays. Any significant operating or construction delay, whatever the cause, could have a material impact on Renergen’s business, financial condition, results of operations or liquidity.

Poor general economic, business, or political conditions may have a material adverse effect on Renergen’s results of operations, liquidity, and financial condition.

Renergen’s current business plan contemplates that a portion of Renergen’s revenue will be derived from the sale of helium and LNG. The demand for helium and LNG is largely driven by the economic, political and regulatory conditions of the countries where Renergen plans to sell such commodities (for example, the U.S. and South Africa). Therefore, Renergen’s results of operations and financial condition are, to a large extent, dependent upon the overall level of economic activity in these countries.

During the last few years, concerns over inflation, energy costs, volatile oil and natural gas prices, geopolitical issues, the availability and cost of credit, rising interest rates, the overall health of the banking sector, the slowdown in economic growth in large emerging and developing markets, regional or worldwide increases in tariffs or other trade restrictions, and other issues have contributed to increased economic uncertainty and diminished expectations for the global economy.

Concerns about global economic conditions have had a significant adverse impact on domestic and international financial markets and commodity prices. If uncertain or poor economic, business, or industry conditions in the United States or abroad remain prolonged, demand for petroleum products could diminish or stagnate, and production costs could increase. These situations could impact the price at which Renergen can sell Renergen’s LNG and helium, affect Renergen’s vendors’, suppliers’, and customers’ ability to continue operations, and ultimately adversely impact Renergen’s business, financial condition, results of operations or liquidity.

If Renergen loses senior management or is unable to hire and/or retain sufficient technically skilled and experienced employees, Renergen’s business may be materially adversely affected.

Renergen’s ability to continue to operate, innovate, improve or expand depends on, among other things, Renergen’s ability to retain and attract senior management and key employees with appropriate knowledge and skills, experience and other competencies as may be required to be competitive and to achieve Renergen’s business strategies over the long term. However, the energy industry in South Africa continues to experience a shortage of qualified senior management and technically skilled employees. Renergen may be unable to hire or retain (due to departure or unavailability) appropriate senior management, technically skilled and experienced employees or other management personnel, or Renergen may have to pay and/or award higher levels of remuneration (including sign-on packages, gross packages and short- and long-term incentives) than Renergen currently provides to its employees. To the extent that Renergen is unable to hire or retain appropriate management and technically skilled personnel, or if there are not adequate succession plans in place, this could have a material adverse effect on Renergen’s business and on Renergen’s production levels, operating results and financial position. Renergen’s inability to hire or retain appropriate management and technically skilled personnel from designated groups may also affect Renergen’s

14

 


compliance with Renergen’s employment equity obligations and the undertakings that Renergen has made in Renergen’s social and labor plan in respect of the employment of historically disadvantaged persons.

Extreme weather and changing climatic conditions exacerbated by climate change impacts, including prolonged droughts, could lead to delays in Renergen’s projects and adversely affect Renergen’s operations.

Renergen’s operations are subject to various physical weather and climate risks, which may be exacerbated by climate change. Climate change may result in the increased frequency or severity of extreme weather events (including storms, droughts, floods, and wildfires) or changes in meteorological and hydrological patterns, which could adversely impact Renergen’s operations and financial results through, for example, water use curtailments in response to drought or construction delays resulting from more frequent storms and flooding. Renergen takes proactive measures to monitor water availability and quality within Renergen’s operations to help avoid and mitigate impacts to Renergen’s operations. In addition, the occurrence of extreme weather events has the potential to result in supply chain disruptions. While extreme weather events have increased in frequency and intensity in some areas where Renergen operates, to date such events have not had a material impact on Renergen’s operations nor materially adversely affected Renergen’s business.

Renergen’s reserves data are estimates based on assumptions that may be inaccurate and are based on existing economic and operating conditions that may change in the future, which could materially and adversely affect the quantities and value of Renergen’s reserves.

Renergen’s reserve estimates and the present value of future net cash flows from Renergen’s proved, probable and possible reserves, or PV-10, may vary substantially from the actual amounts Renergen is able to recover economically from Renergen’s reserves. The process of estimating natural gas and helium reserves is complex. There are numerous uncertainties inherent in estimating quantities of reserves, including many factors beyond Renergen’s control. Estimates of reserves require interpretations of available technical data and necessarily depend upon a number of variables and assumptions, any one of which may, if incorrect, result in an estimate that varies considerably from actual results. Any significant inaccuracies in these interpretations or assumptions could materially affect the estimated quantities and present value of Renergen’s reserves. These factors and assumptions relate to, among other aspects:

•
successful completion of Phase 2, on time and on budget;
•
future prices, production costs, capital expenditures and transportation costs;
•
the effects of regulation by governmental agencies; and
•
geologic conditions, which may not be identified by available exploration data and may differ from Renergen’s experiences in areas where Renergen currently produces.

You should not assume that the present value of future net revenues from Renergen’s reserves is the current market value of Renergen’s estimated reserves. Actual production, revenue and expenditures with respect to Renergen’s reserves will likely vary from Renergen’s estimates, and these variations may be material.

Further, any delays in the timing or increased costs of construction with respect to Phase 2 could result in reserve write-downs, which could materially affect Renergen’s PV-10, business, operating results and financial condition.

The PV-10 of Renergen’s estimated proved, probable and possible reserves is not necessarily the same as the current market value of Renergen’s estimated natural gas and helium reserves.

The PV-10 of Renergen’s estimated proved, probable and possible reserves may not be the current market value of Renergen’s estimated natural gas and helium reserves. In accordance with rules established by the SEC, Renergen bases the estimated discounted future net cash flows from Renergen’s reserves on contract prices, calculated as costs in effect on the date of the estimate, holding the prices and costs constant throughout the life of the properties. Actual future prices and costs may differ materially from those used in the net present value estimate, and future net present value estimates using then current prices and costs may be significantly less than the current estimate. In addition, the 10% discount factor Renergen uses when calculating discounted future net cash flows may

15

 


not be the most appropriate discount factor based on interest rates in effect from time to time and risks associated with Renergen or the natural gas and helium industry in general.

Power stoppages, fluctuations, usage constraints and limited access to sufficient water may force Renergen to halt or curtail operations and/or increase costs.

Renergen’s operations are dependent on electricity supplied by Eskom, a state-owned utility company that historically has held a monopoly over electricity supply in the South African market. Over the past decade, electricity supply in South Africa has been constrained, with multiple power supply disruptions and load shedding constraints, which is a controlled process of restricting the electricity supply in response to unplanned events that commenced in South Africa in 2008. For example, after a strike at Eskom in June 2018, Eskom re-commenced load shedding to protect the power system from going offline. In 2022 and 2023, Eskom increased implementation of load shedding due to various constraints on its power generation units, which have resulted in certain unplanned outages. Although the position has materially improved since 2024, load shedding may return in the short- to medium-term, particularly as the South African economy may increase growth under the GNU. Later in the decade, Eskom will also start to decommission some of its coal-fired power plants. Despite Eskom’s efforts to protect the national power grid to date, there is no assurance that Eskom’s efforts will prevent a nationwide blackout. Eskom has been unable to generate and supply the amount of electricity required by South Africa, which has resulted in significant and often unpredictable electricity supply disruptions. Eskom has implemented a number of short- and long-term mitigation plans to correct these issues but supply disruptions have continued to occur regularly and with no predictability. Prolonged power outages, disruptions, or shortages in supply of electricity to Renergen’s operations would have a material adverse impact on production and Renergen’s results of operations.

Eskom has increasing costs of generation emanating from, among others, primary energy costs such as high diesel consumption related to its use of peaking power plants to supplement the shortfall in base load generation, reduced generation of electricity from its base load fleet as a result of a very low energy availability factor at its old power stations, operating costs and asset related revenue recovery. Eskom is required to submit regular applications to the National Energy Regulator of South Africa (“NERSA”), an independent regulatory body, in accordance with, among others, the principles set out in the Electricity Regulation Act, 2006 (Act No. 4 of 2006) requesting an increase in the power tariffs. Each tariff increase request, if granted by NERSA, results in higher energy costs for electricity users in South Africa, including Renergen. NERSA has approved an 8.76% increase in electricity tariffs for the period from April 1, 2026 to March 31, 2027, with a further increase of 8.86% to take effect in April 2027. Eskom has expressed concern that these increases may not be adequate to prevent future electricity interruptions and has indicated that it intends to challenge NERSA’s decision not to grant the requested tariff increase. In several instances, the court has ruled in Eskom’s favor, allowing retrospective recovery through tariff increases. It is anticipated that Eskom will pursue further tariff increase applications, which will result in further tariff uncertainty and price increases. During certain periods of load shedding, Eskom has burned significant amounts of diesel to run its gas turbines and has asked large power users to curtail their demand. This has contributed to Eskom’s ongoing financial difficulties and above inflation tariff applications to NERSA. Although as of September 18, 2026, South Africa has gone 490 consecutive days without load shedding, there is no guarantee that load shedding will not return.

Furthermore, in February 2019, the President of South Africa announced the vertical unbundling of Eskom. While full state ownership will be maintained, the unbundling is expected to result in the separation of Eskom’s generation, transmission and distribution functions into separate entities, which may require legislative and/or policy reform, which could take a significant amount of time and could cause poor reliability of the supply of electricity, instability in prices, and a possible tariff increase above inflation that could continue through the unbundling process. Should Renergen experience further power tariff increases, Renergen’s operating results and financial condition may be adversely impacted.

Although the South African Department of Electricity and Energy is developing a recovery program to improve the reliability of power supply in South Africa, with significant success in 2024 to date, there can be no assurance that this program will provide sufficient supply for the needs of the country or for Renergen to run Renergen’s operations at full capacity or at all.

16

 


Renergen’s operations also require significant amounts of water. Renergen is dependent on the availability of water in Renergen’s areas of operations and, in particular, on the provision of a sufficient allocation of water to enable Renergen to conduct Renergen’s business. Renergen’s operations are located in historically water scarce areas, which such scarcity may be further impacted by climate change. Renergen’s current water supply to Renergen’s facilities and Renergen’s operations comes directly from the municipal main supply system, which also supplies the mining houses in the area and historically has not been prone to supply constraints. This municipal main supply system would also be the main source of water supply for Phase 2 of the Virginia Gas Project. Renergen’s on-site service water tank has sufficient water storage should unplanned service interruptions occur. Additionally, Phase 1 and Phase 2 of the Virginia Gas Project are designed for efficient water usages, including the recycling of produced water from plant operation wastewater and the recycling of treated sewage waste. However, shifting rainfall patterns, population growth and urban development in the areas surrounding Renergen’s operations are expected to lead to increased demands on the existing water supply, which, coupled with inadequate upgrades to existing water infrastructure, may cause water shortages in relation to Renergen’s areas of operations. If Renergen cannot be supplied with sufficient water, Renergen’s results of operations and financial condition may be adversely impacted.

A cyber-attack could result in operational interruptions or the infringement of sensitive data, financial loss, and negative impacts on reputation.

A cyber-attack on Renergen could result in operational interruptions or the infringement of sensitive data, financial loss, and negative impacts on reputation. Renergen uses a variety of information technology systems in the ordinary course of business, which are potentially vulnerable to unauthorized access, computer viruses, ransomware software viruses and other similar types of malicious activities and cyber-attacks, including cyber-attacks to Renergen’s information technology infrastructure and attempts by others to gain access to Renergen’s propriety or sensitive information, which range from individual attempts to advanced, persistent threats. These attacks, and, in particular, ransomware attacks, such as the Colonial Pipeline ransomware incident in May 2021, have become increasingly frequent and sophisticated globally, with attractive returns for criminals. The procedures and controls Renergen uses to monitor these threats and mitigate Renergen’s exposure may not be sufficient to prevent cybersecurity incidents. The results of these incidents could include misstated financial data, theft of trade secrets or other intellectual property, liability for disclosure of confidential customer, supplier or employee information, increased costs arising from the implementation of additional security protective measures, litigation and reputational damage, which could materially adversely affect Renergen’s financial condition, business or results of operations. Any remedial costs or other liabilities related to cyber-attacks may not be fully insured or indemnified by other means.

The large-scale outbreak of infectious diseases could severely impact Renergen’s business, financial condition, results of operations, prospects and workforce.

The large-scale outbreak of infectious diseases increases morbidity and mortality over a wide geographic area, which could lead to a significant economic, social and political disruption in the areas in which Renergen operates. If another pandemic or large-scale outbreak of another infectious disease were to arise, Renergen would have to re-apply for this designation and no assurance can be made that the South African government would approve such designation for such other pandemic or large-scale outbreak of another infectious disease.

Volatile macroeconomic conditions, such as fluctuating foreign exchange and rising inflation rates, may negatively impact operating costs and capital expenditures, which could affect Renergen’s results of operations and liquidity.

Volatile macroeconomic conditions, such as fluctuating foreign exchange and rising inflation rates, may negatively impact operating costs and capital expenditures, which could affect Renergen’s results of operations and liquidity. For example, in fiscal year 2026, Renergen recognized approximately $8.3 million of net foreign exchange gains, principally from the remeasurement of U.S. dollar-denominated debt and supplier balances, compared to total revenue of approximately $2.6 million. Because a substantial portion of Renergen’s debt is denominated in U.S. dollars while its functional currency is the South African Rand, exchange rate movements may continue to have a

17

 


disproportionate effect on Renergen’s reported results, and in certain periods foreign exchange effects may obscure the underlying operating performance of Renergen’s business.

Furthermore, LNG is marketed in South Africa as a substitute / alternative for diesel fuel. It is priced at a discount to wholesale diesel fuel. Because diesel fuel prices are highly correlated with the Brent crude oil price, increases or decreases in the price of crude oil impact Renergen’s sales accordingly. Historically, the increasing cost of diesel fuel in South Africa has outstripped the domestic inflation rate. In addition, if exchange rates or interest rates, such as the SOFR, or any replacement benchmark rate, and the South African prime interest rate, increase significantly, Renergen’s finance expenses will increase, and Renergen’s ability to obtain financing may decrease, which may materially adversely affect Renergen’s results of operations. South Africa’s central bank, the South African Reserve Bank, controls the repurchase rate, which is the rate at which the South African Reserve Bank lends to South African banks. The repurchase rate in turn determines the South African prime interest rate, which is the rate at which South African banks will lend to customers like Renergen. Fluctuations in exchange rates and interest rates are caused by several factors that are beyond Renergen’s control, such as local and international central bank policy changes, geopolitical shift, global economic factors and others. Such volatile macroeconomic conditions may negatively impact operating costs and capital expenditures, which could affect Renergen’s results of operations and liquidity.

If Renergen fails to comply with its obligations under license or technology agreements with third parties, Renergen may be required to pay damages and could lose license rights that are critical to its business.

Renergen licenses certain intellectual property rights, including technologies and data from third parties, which are important to Renergen’s business, and, in the future, Renergen may enter into additional agreements that provide Renergen with licenses to valuable intellectual property rights or technology. For example, Renergen currently licenses satellite vegetation stress analyses software, detailed sub-surface modeling software, advanced DCS, SCADA or PLC systems and software, as well as hardware related licenses for specialist cryogenic equipment. Renergen’s future technological needs may be subjected to proprietary licensing requirements.

If Renergen fails to comply with any of the obligations under Renergen’s license agreements, Renergen may be required to pay damages and the licensor may have the right to terminate the license. Termination by the licensor would cause Renergen to lose valuable rights and could prevent Renergen from selling Renergen’s products and services, or inhibit Renergen’s ability to commercialize future products and services. Renergen’s business would suffer if any current or future licenses terminate, if the licensors fail to abide by the terms of the license, if the licensors fail to enforce licensed patents against infringing third parties, if the licensed intellectual property rights are found to be invalid or unenforceable, or if Renergen is unable to enter into necessary licenses on acceptable terms. In addition, Renergen’s rights to certain technologies are licensed to Renergen on a non-exclusive basis. The owners of these non-exclusively licensed technologies are therefore free to license them to third parties, including Renergen’s competitors, on terms that may be superior to those offered to Renergen, which could place Renergen at a competitive disadvantage. Moreover, Renergen’s licensors may own or control intellectual property rights that have not been licensed to Renergen and, as a result, Renergen may be subject to claims, regardless of their merit, that Renergen is infringing, misappropriating or otherwise violating the licensor’s rights. In addition, the agreements under which Renergen licenses intellectual property rights or technology from third parties are generally complex, and certain provisions in such agreements may be susceptible to multiple interpretations. The resolution of any contract interpretation disagreement that may arise could narrow what Renergen believes to be the scope of Renergen’s rights to the relevant intellectual property rights or technology, or increase what Renergen believes to be Renergen’s financial or other obligations under the relevant agreement. Any of the foregoing could have a material adverse effect on Renergen’s competitive position, business, financial condition, and results of operations.

Renergen may not be successful in obtaining, maintaining, enforcing, defending and protecting Renergen’s intellectual property and other proprietary rights, products or processes, including Renergen’s unpatented proprietary knowledge and trade secrets, or in avoiding claims that Renergen infringed, misappropriated or otherwise violated the intellectual property rights of others.

Renergen’s business and Renergen’s ability to compete effectively depend on Renergen’s ability to obtain, maintain, defend, protect and enforce Renergen’s intellectual property rights, confidential information, know-how

18

 


and other proprietary rights, products or processes. Renergen relies on intellectual property laws in South Africa and other countries, as well as confidentiality procedures, cybersecurity practices and contractual provisions and restrictions, to protect the intellectual property rights and other proprietary rights relating to Renergen’s products, proprietary processes and proprietary technology. Despite Renergen’s efforts to obtain, maintain, defend, protect and enforce Renergen’s intellectual property rights and other proprietary rights, products or processes, there can be no assurance that these protections will be available in all cases or will be adequate to prevent Renergen’s competitors or other third parties from copying, accessing or otherwise obtaining and using Renergen’s technology, intellectual property rights or other proprietary rights, products or processes without Renergen’s permission. Further, there can be no assurance that Renergen’s competitors will not independently develop products or processes that are substantially equivalent or superior to Renergen’s or design around Renergen’s intellectual property rights and other proprietary rights. In each case, Renergen’s ability to compete could be significantly impaired.

Renergen may, over time, increase Renergen’s investment in protecting Renergen’s intellectual property rights through patent, trademark, copyright and other intellectual property filings, which could be expensive and time-consuming. Renergen may not be able to obtain registered intellectual property protection for Renergen’s products or processes, and, even if Renergen is successful in obtaining effective patent, trademark, trade secret and copyright protection, it is expensive and time-consuming to maintain, and defend, these rights in terms of application and maintenance costs. Moreover, Renergen’s failure to develop and properly manage new intellectual property rights could hurt Renergen’s market position and business opportunities.

In addition, these measures may not be sufficient to offer Renergen meaningful protection or provide Renergen with any competitive advantages. Renergen will not be able to protect Renergen’s intellectual property rights if Renergen is unable to enforce Renergen’s rights or if Renergen does not detect unauthorized use of Renergen’s intellectual property rights. Moreover, any changes in, or unexpected interpretations of, intellectual property laws may compromise Renergen’s ability to enforce Renergen’s trade secrets, intellectual property rights and other proprietary rights. If Renergen is unable to adequately protect Renergen’s intellectual property rights and other proprietary rights, Renergen’s competitive position and Renergen’s business could be harmed, as third parties may be able to commercialize and use products and technologies that are substantially the same as Renergen’s products and technologies to compete with Renergen without incurring the development and licensing costs that Renergen has incurred. Any of Renergen’s owned or licensed intellectual property rights could be challenged, invalidated, circumvented, infringed, misappropriated or violated, Renergen’s trade secrets and other confidential information could be disclosed in an unauthorized manner to third parties, or Renergen’s intellectual property rights may not be sufficient to permit Renergen to take advantage of current market trends or to otherwise provide Renergen with competitive advantages, which could result in costly redesign efforts, discontinuance of some of Renergen’s product offerings or other competitive harm.

Renergen believes that Renergen has sufficient intellectual property rights to allow Renergen to conduct Renergen’s business without incurring liability to third parties. However, Renergen or Renergen’s products may nonetheless infringe, misappropriate or otherwise violate the intellectual property rights of third parties, or Renergen may determine in the future that Renergen may be required to enter into costly license agreements or require other rights to intellectual property rights held by third parties. Such a license or other rights may not be available to Renergen on commercially reasonable terms or at all, in which case Renergen may be prevented from using, providing or manufacturing certain products or services, as applicable, or using brands as Renergen sees fit. Renergen may in the future become involved in lawsuits to protect or enforce Renergen’s intellectual property rights. An adverse result in any litigation proceeding could harm Renergen’s business.

Renergen’s holding company structure makes Renergen dependent on the operations of Renergen’s subsidiaries.

Renergen is a holding company and Renergen’s subsidiaries conduct all of Renergen’s operations and own all of Renergen’s operating assets. Renergen’s material assets are its direct equity interests in Tetra4. Renergen has no independent means of generating revenue. Renergen is, therefore, dependent on payments, dividends and distributions from its subsidiaries for funds to pay Renergen’s operating and other expenses and to pay future cash dividends or distributions, if any, to holders of the ordinary shares, and Renergen may have tax costs in connection with any dividend or distribution. In addition, the ability of Renergen’s subsidiaries to make distributions to Renergen may be restricted by, among other things, loans, credit facilities and applicable laws and regulations. If Renergen is unable to obtain funds from Renergen’s subsidiaries, Renergen may not be able to pay future dividends

19

 


or distributions, if any, to holders of the ordinary shares, or to pay interest or principal on any debt Renergen may incur when due.

The historical financial results of Renergen may not be indicative of what Renergen’s actual financial position or results of operations will be in future periods.

The historical financial results of Renergen may not be indicative of the financial condition, results of operations or cash flows that Renergen may achieve in the future. This is primarily the result of the fact that Renergen only recently entered the production phase of Phase 1 of the Virginia Gas Project and Phase 2 is ongoing. Renergen’s financial condition and future results of operations could be materially different from amounts reflected in the historical financial statements, so it may be difficult for investors to compare Renergen’s future results to historical results or to evaluate Renergen’s relative performance or trends in Renergen’s business.

Strikes, riots and labor disruptions can damage economic growth and, in turn, negatively impact Renergen’s business.

Strikes, riots and labor disruptions can damage economic growth and, in turn, lead to loss of production and/or interruption of Renergen’s operations. In the first half of 2022, South Africa lost 1.6 million work days due to strikes among industrial workers (based on estimated participants in the strikes), which was more than thirty times higher than the same prior year period. In August 2022, eight South African workers’ unions joined to protest power cuts, rising costs of living, and high unemployment levels. Renergen could suffer supply chain disruptions due to any labor disputes, slowdowns or shutdowns that may occur. For example, during the height of the COVID-19 pandemic due to government enforced lockdowns, Renergen suffered project delays for various components of Renergen’s gas gathering system, balance of plant utilities and LNG and liquid helium processing plant because of supply chain challenges. Renergen also experienced a two to three times increase in shipping transit times from China, Europe and the U.S. to South Africa, which exacerbated many of Renergen’s project delays. Additionally, South Africa experienced a period of political unrest in July 2021 as a result of the sentencing of the former President Jacob Zuma for contempt of court, which led to significant labor disruptions in the regions of Kwa-Zulu Natal and Gauteng. While there have not been any significant labor strikes in recent years, the political environment could change rapidly, and any labor strikes, riots and/or labor disruptions may negatively impact Renergen’s employment relationships and could increase Renergen’s risk exposure, which in turn could negatively impact on Renergen’s results of operations and financial condition.

Drilling for and producing natural gas and helium are high risk activities with many uncertainties that could adversely affect Renergen’s financial condition or results of operations.

Renergen’s drilling activities are subject to many risks, including the risk that they will not discover commercially productive reservoirs. Drilling for natural gas and helium can be uneconomical, not only from dry holes, but also from productive wells that do not produce sufficient revenues to be commercially viable. There is no way to predict in advance of drilling and testing whether any particular prospect will yield natural gas or helium in sufficient quantities to recover drilling or completion costs or to be economically viable. The use of micro-seismic data and other technologies and the study of producing fields in the same area will not enable Renergen to know conclusively prior to drilling whether natural gas or helium will be present or, if present, whether natural gas or helium will be present in commercial quantities. Renergen cannot assure you that the analogies Renergen draws from available data from other wells will be applicable to Renergen’s drilling prospects. In addition, drilling and producing operations on Renergen’s acreage may be curtailed, delayed or canceled as a result of other factors, including:

•
declines in natural gas or helium prices;
•
infrastructure limitations;
•
the high cost of, shortages in or delays with respect to receipt of equipment, materials and services;
•
unexpected operational events, pipeline ruptures or spills, adverse weather conditions, facility malfunctions or title problems;
•
compliance with environmental and other governmental requirements;
•
regulations, restrictions, moratoria and bans on injection wells and water disposal;
•
unusual or unexpected geological formations;

20

 


•
environmental hazards, such as natural gas or well fluids spills or releases, pipeline or tank ruptures and discharges of toxic gas;
•
fires, blowouts, craterings and explosions;
•
uncontrollable flows of natural gas or well fluids;
•
changes in the cost of decommissioning or plugging wells;
•
maintenance of quality, purity and thermal quality standards both for commodity sales and purposes of transportation;
•
members of the public have engaged in physical confrontations or acts of sabotage to impede or prevent transportation of hydrocarbons; and
•
pipeline capacity curtailments.

In addition to causing curtailments, delays and cancellations of drilling and producing operations, many of these events can cause substantial losses, including personal injury or loss of life, damage to or destruction of property, natural resources and equipment, pollution, environmental contamination, loss of wells and regulatory penalties. The occurrence of an event that is not fully covered by insurance could have a material adverse impact on Renergen’s business activities, financial condition and results of operations.

The development of Renergen’s proved undeveloped, probable and possible reserves may take longer and may require higher levels of capital expenditure than Renergen currently anticipates. Therefore, Renergen’s proved undeveloped, probable and possible reserves may not be ultimately developed or produced.

Approximately 97.9% of Renergen’s estimated net proved reserves volumes for each of natural gas and helium were classified as proved undeveloped ("PUD") as of February 28, 2026. Development of these reserves may take longer and require higher levels of capital expenditure than Renergen currently anticipates. Moreover, the development of Renergen’s probable and possible reserves will require additional capital expenditures and are less certain to be recovered than proved reserves. Estimated future costs relating to the infill drilling of Renergen’s natural gas and helium PUDs and constructing required infrastructure at February 28, 2026 are approximately $92 million in the aggregate. Renergen expects to fund these expenditures through cash flows generated by operations, borrowings under the DFC Credit Facility Agreement, the IDC Loan Agreement and other sources of capital, including senior secured debt funding from the DFC and the Standard Bank of South Africa. As of May 31, 2026, Renergen has not included any costs relating to the development of Renergen’s probable and possible reserves in Renergen’s estimated future budget over the next five years. Renergen’s ability to fund development expenditures is subject to a number of risks. Delays in the development of Renergen’s reserves, increases in costs to drill and develop such reserves or decreases in commodity prices will reduce the value of Renergen’s estimated PUDs and future net revenues estimated for such reserves and may result in some projects becoming uneconomic. In addition, delays in the development of reserves could cause Renergen to reclassify Renergen’s PUDs as unproved reserves. Furthermore, there is no certainty that Renergen will be able to convert Renergen’s PUDs to developed reserves or Renergen’s probable and possible reserves into proved reserves or that Renergen’s undeveloped or unproved reserves will be economically viable or technically feasible to produce.

Further, SEC rules require that, subject to limited exceptions, PUDs may only be booked if they relate to wells scheduled to be drilled within five years after the date of booking. This requirement has limited and may continue to limit Renergen’s ability to book additional PUDs as Renergen pursues its drilling program. As a result, Renergen may be required to write down Renergen’s PUDs if Renergen does not drill those wells within the required five-year timeframe.

Renergen uses information, communication, and technology systems, which record personal information. Failure of these systems, or the failure to protect personal information, could impact Renergen’s business and operations.

Renergen receives, generates, stores and otherwise processes sensitive information, such as personal information. Renergen faces a number of risks relative to protecting this critical information, including loss of access risk, inappropriate use or disclosure, inappropriate modification, and the risk of Renergen being unable to adequately monitor, audit and modify Renergen’s controls over Renergen’s critical information. This risk extends to the third-party vendors and subcontractors Renergen uses to manage this sensitive data.

21

 


The right to privacy of both natural and juristic persons (including companies) is regulated by the Protection of Personal Information Act, 2013 (the “POPIA”), which works alongside the Promotion of Access to Information Act, 2000 (the “PAIA”). With effect from July 1, 2021, a “responsible party” must ensure that it processes personal information of another (known as a “data subject”) in accordance with the principles contained in the POPIA. The “processing” of personal information refers to any operation or activity concerning such personal information and includes collection, storage, use, alteration, retrieval (amongst others). In addition, the POPIA includes provisions relating to the processing of “special personal information,” which includes information concerning a data subject’s religious or philosophical beliefs, race or ethnic origin, trade union membership, political persuasion, health or sex life and criminal behavior or biometric information. The POPIA would apply to the “processing” of personal information relating to Renergen’s employees, customers, suppliers, shareholders and service providers. It also regulates the transfer of personal information outside South Africa by Renergen and the processing of personal information for a responsible party by an independent third party known as an “operator” (data processor).

Any person (being natural or juristic persons, private or public bodies) who believes that Renergen has failed to comply with Renergen’s obligations under the POPIA may lodge a complaint with the Information Regulator, who is, among others, empowered to monitor and enforce compliance with the provisions of the PAIA and the POPIA (the “Information Regulator”), and who is required to investigate the complaint. The Information Regulator may commence an investigation on its own initiative. In conducting this investigation, the Information Regulator may summon and enforce the appearance of persons before the Information Regulator, compel the production of documents, access and search any premises, conduct interviews, and carry out any inquiries at the premises that the Information Regulator deems fit. The Information Regulator is also empowered to issue a request for information by way of an information notice.

Upon completion of the investigation, the Information Regulator may refer the complaint to the Enforcement Committee of the POPIA (the “Enforcement Committee”) for consideration, a finding in respect of the complaint, and a recommendation in respect of the proposed action to be taken by the Information Regulator in respect of the complaint. Based on the recommendations of the Enforcement Committee, the Information Regulator may issue the responsible party with an enforcement notice directing the responsible party to take specific measures or to stop processing personal information or take the steps specified in the notice or refrain from taking such steps. The Information Regulator may also impose an administrative fine.

Renergen cannot guarantee that Renergen’s POPIA compliance efforts will be deemed appropriate or sufficient by regulatory authorities or the courts. South African law provides protection to the personal information of both individuals and companies, the latter forming the vast majority of entities with whom Renergen does business. Moreover, Renergen may have difficulty adapting Renergen’s systems and processes to the new legislation. The changes have impacted, and could further adversely impact, Renergen’s business by increasing Renergen’s operational and compliance costs. Renergen’s or its third-party vendors’ failure to comply with applicable data protection laws and regulations (such as in the event of a security breach) could result in claims, disputes, proceedings, government enforcement actions (which could include civil or criminal penalties), loss in customers and suppliers, private litigation and/or adverse publicity, monetary penalties or other liabilities, all of which could increase Renergen’s costs of doing business, distract Renergen’s management, require Renergen to change Renergen’s operations and negatively affect Renergen’s operating results and business. Claims that Renergen has violated data subjects’ privacy rights, failed to comply with data protection laws, or breached Renergen’s contractual obligations or privacy policies, even if Renergen is not found liable, could be expensive and time consuming to defend, could result in adverse publicity and could have a material adverse effect on Renergen’s business, financial condition and results of operations. Renergen may also be contractually required to indemnify and hold harmless third parties from the costs or consequences of non-compliance with any laws, rules and regulations or other legal obligations relating to privacy or consumer protection or any inadvertent or unauthorized use or disclosure of personal information that Renergen stores or otherwise processes as part of operating Renergen’s business.

Unplanned stoppages and unforeseen operational interruptions and operational accidents or injuries could adversely affect Renergen’s performance.

Unplanned stoppages and unforeseen operational interruptions and operational accidents or injuries could adversely affect Renergen’s performance. Renergen’s operational processes may be subject to operational accidents,

22

 


including but not limited to processing plant fires and explosions, damages caused by abnormal wear, inclement weather, incorrect operation, rock bursts, cave-ins or falls of ground, collapse of pit walls, flooding, loss of power supply, environmental pollution and mechanical critical equipment failures. During the period March 1, 2025 to May 31, 2026, Renergen recorded no incidents requiring stoppage of operations, no pollution incidents, and no non-conformance to critical controls events. Renergen recorded 32 “incidents” ranging in severity from observations to minor injuries resulting in first aid treatment with 3 contractors requiring medical treatment and one contractor employee suffering a lost-time injury where the employee lost five shifts. From March 1, 2026 to May 31, 2026, Renergen recorded 56 incidents, none of which required a stoppage of operations and all incidents were not severe only requiring first aid treatment. Additionally, non-compliance with critical controls could lead to safety incidents or potential fatalities. The occurrence of one or more of these events may result in the death of, or personal injury to, personnel, the loss of equipment, damage to or destruction of properties or facilities, disruptions in production, increased costs, environmental damage and potential legal liabilities, all of which could have an adverse effect on Renergen’s business financial condition and results of operations.

Operational risks may adversely impact Renergen’s business or results of operations.

Renergen’s operating results are dependent on the continued operation of Renergen’s exploration and production facilities, Renergen’s ability to meet customer contract requirements and other needs. Insufficient or excess capacity with respect to Renergen’s exploration and production facilities threatens Renergen’s ability to generate competitive profit margins and may expose Renergen to liabilities related to contract commitments. Renergen’s operating results are also dependent on Renergen’s ability to obtain statutorily required consents on time, complete new construction projects on time, on budget and in accordance with performance requirements. Failure to do so may expose Renergen’s business to loss of revenue, potential litigation and loss of business reputation.

Also inherent in the management of Renergen’s production facilities and delivery systems, including storage, vehicle transportation and pipelines, are operational risks that require continuous training, oversight and control. Material operating failures at production or storage facilities or pipelines, including fire, toxic release and explosions, or the occurrence of vehicle transportation accidents could result in loss of life, damage to the environment, loss of production and/or extensive property damage, all of which may negatively impact Renergen’s financial results.

The third parties on whom Renergen may rely for gathering and transportation services are subject to complex laws that may adversely impact Renergen’s business or results of operations.

Generally, Renergen is responsible for conveying gas from the Virginia Gas Plant with a direct connection to trucks owned by Renergen and for transporting the gas directly to end customers. There may be instances where Renergen might rely on a third-party service provider for gathering and transportation services using the transportation fleet of the relevant third-party service provider. Such third-party service providers are subject to complex and stringent laws and regulations that require obtaining and maintaining numerous permits, approvals and certifications from various government authorities. These third parties may incur substantial costs in order to comply with existing laws and regulations. If existing laws and regulations governing such third party services are revised or reinterpreted, if new laws and regulations become applicable to their operations, or if these third parties otherwise change the rates, terms, or conditions of service, such changes may affect the availability of or the costs that Renergen pays for services. Similarly, a failure to comply with such laws and regulations by the third parties could have a material adverse effect on Renergen’s business, financial condition, and results of operations. Moreover, the operations of these third parties could be subject to legal challenges that could disrupt service to Renergen’s operations and consequently adversely impact Renergen’s business or results of operations.

Renergen’s insurance coverage may not adequately satisfy all potential claims in the future.

Although Renergen believes Renergen has sufficient insurance coverage, Renergen may become subject to liability for pollution, occupational illness, climate change and other resource impacts or other hazards against which Renergen has not been insured, cannot insure or is insufficiently insured, including those relating to past operations. Renergen’s existing property and liability insurance contains specific exclusions and limitations on coverage.

23

 


Should Renergen suffer a major loss, which is insufficiently covered, future earnings could be affected. In addition, certain classes of insurance may not continue to be available at economically acceptable premiums. As a result, in the future, Renergen’s insurance coverage may not fully cover the extent of claims against it or any cross-claims made.

Any acquisition, partnership or joint venture that Renergen makes or enters into could disrupt Renergen’s business and harm Renergen’s results of operations and financial condition.

Renergen evaluates, and expects in the future to evaluate, potential strategic acquisitions of, and partnerships or joint ventures with, complementary businesses, services or technologies. Renergen may not, however, be able to identify appropriate acquisition, partnership or joint venture targets in the future, and Renergen’s efforts to identify such targets may result in a loss of time and financial resources. In addition, Renergen may not be able to negotiate or finance such future acquisitions successfully or on favorable terms, enter into partnerships or joint ventures successfully or on favorable terms, or to effectively integrate acquisitions into Renergen’s current business, and Renergen may lose customers or personnel as a result of any such strategic transaction (including the customers and personnel of an acquired business). The process of integrating an acquired business, technology, service, or product into Renergen’s business may divert management’s attention from Renergen’s core business. It may result in unforeseen operating difficulties and expenditures and generate unforeseen pressures and strains on Renergen’s organizational culture. Moreover, Renergen may be unable to realize the expected benefits, synergies or developments that Renergen initially anticipates from such a strategic transaction.

Financing an acquisition or other strategic transaction could result in dilution to existing shareholders from issuing equity securities or convertible debt securities, or a weaker balance sheet from using cash or incurring debt, and equity or debt financing may not be available to Renergen on favorable terms, if at all. In addition, it is possible that the goodwill that has been attributed, or may be attributed, to the strategic target may have to be written down if the valuation assumptions are required to be reassessed as a result of any deterioration in the underlying profitability, asset quality and other relevant matters. There can be no assurance that Renergen will not have to write down the value attributed to goodwill in the future, which would adversely affect Renergen’s results of operations and net assets.

The integration of any acquired assets requires management capacity. There can be no assurance that Renergen’s current management team has sufficient capacity, or that it can acquire additional skills to supplement that capacity, to integrate any acquired or new assets and operations and to realize cost and operational efficiencies at the acquired assets or maintain those at the existing operations.

Furthermore, Renergen may be unable to complete a proposed transaction if Renergen is unable to obtain required regulatory approvals, including approvals from the applicable regulatory authorities in the various jurisdictions in which Renergen or a potential acquisition target operates. Even if Renergen is able to obtain regulatory approval, such approval could be subject to certain conditions, which could prevent Renergen from competing for certain customers or in certain lines of business. In addition, Renergen may face contingent liabilities in connection with Renergen’s acquisitions and joint ventures, including, among others, (1) judicial or administrative proceeding or contingencies relating to Renergen, asset or business acquired, including civil, regulatory, tax, labor, social security, environmental and intellectual property proceedings or contingencies; and (2) financial, reputational and technical issues, including with respect to accounting practices, financial statement disclosures and internal controls, as well as other regulatory or compliance matters, all of which Renergen may not have identified as part of Renergen’s due diligence process and that may not be sufficiently indemnifiable under the relevant acquisition or joint venture agreement. Renergen cannot guarantee that any acquisition, partnership or joint venture Renergen makes will not have a material adverse effect on Renergen’s business, results of operations and financial condition.

Possible disputes in relation to access, use and servitude agreements entered into with landowners could result in timing delays.

To enable Renergen to commence Renergen’s operations and exploration and development activities, Renergen enters into access, use and servitude agreements with the respective landowners. Such agreements allow

24

 


Renergen to access the property to do exploration and construction work and to construct the pipeline, and the landowner permits Renergen to register a pipeline servitude, booster station servitude, or production well servitude. Any disputes between the respective landowner and Renergen could lead to delays in Renergen’s ability to complete exploration and construction work, resulting in time delays and additional costs.

A duly executed agreement to grant a servitude (or so-called unregistered servitude) gives rise to a real right only when it has been registered. Prior to registration, a third party, in particular a purchaser of the underlying land without notice of the servitude, is therefore not bound to recognize it, although the agreement becomes binding immediately inter partes (between the landowner and Renergen). Once registered, or if any third parties have actual knowledge of it, the servitude becomes enforceable against third parties. Registration of the servitudes can be delayed from a timing perspective should the underlying land be encumbered by a mortgage bond and there is a delay in obtaining bondholder consent to register the servitude.

Renergen may not be able to compete with less carbon-intensive sources of energy, such as renewable natural gas and renewable power, given the expected global energy transition to a low carbon economy.

While Renergen believes it offers a competitive, less carbon-intensive source of helium and natural gas for use in transportation, industrial processes and power generation, Renergen cannot guarantee that Renergen’s products will remain competitive with other sources of energy or that even lower carbon intensive alternatives to Renergen’s products may emerge in the market. Many stakeholders are focused on the development of zero-carbon or carbon negative resources, such as renewable power from wind, solar, or other sources, or renewable natural gas, to assist in the global transition to a low carbon economy, and Renergen cannot guarantee that changes in consumer demand for Renergen’s products will not adversely affect Renergen’s business and results of operations.

Risks Related to Renergen’s Indebtedness and Liquidity

Since its inception, Renergen has generated negative operating cash flows, and Renergen may experience negative cash flow from operations in the future. Renergen’s financial statements have been prepared on a going concern basis.

Renergen has not established an ongoing source of revenue sufficient to cover its operating costs and to allow it to continue as a going concern and will require additional financing to fund its future planned operations. Renergen’s consolidated financial statements have been prepared on a going concern basis, which contemplates the realization of assets and the discharge of liabilities in the normal course of business. Renergen’s independent registered public accounting firm has included in its report for the period ended February 28, 2026, an explanatory paragraph expressing substantial doubt about Renergen’s ability to continue as a going concern. The financial statements contained herein for the six months ended June 30, 2026 have been prepared assuming Renergen will continue as a going concern, but the ability of Renergen to continue as a going concern is dependent on Renergen obtaining adequate capital to fund operating losses until it establishes a revenue stream and becomes profitable. Renergen’s ability to continue as a going concern is contingent upon other factors, Renergen’s ability to achieve its revenue forecasts and Renergen’s ability to raise additional capital through sales of securities and incurrence of debt, which may not be available on favorable terms or at all, as needed to fund future growth. Renergen’s future operations are dependent upon the identification and successful completion of equity or debt financing and the continued achievement of profitable operations at an indeterminate time in the future. Renergen may not be successful in completing equity or debt financing or in achieving profitability. If Renergen is not able to obtain the necessary additional financing on a timely basis, Renergen will be required to delay, reduce the scope of, or eliminate one or more of its development activities or commercialization efforts or perhaps even cease the operation of its business.

The DFC Credit Facility Agreement and IDC Loan Agreement place operating restrictions on Renergen and create default risks.

The DFC Credit Facility Agreement and the IDC Loan Agreement contain covenants that place restrictions on Renergen’s operating activities. Pursuant to the DFC Credit Facility Agreement, Tetra4 is required to maintain certain financial covenants, including, (a) (i) a ratio of all interest bearing debt to EBITDA of not more than 3.0 to 1; (ii) a ratio of current assets to current liabilities of not less than 1 to 1; and (iii) a reserve tail ratio of not less than 25%; and (b) (i) a ratio of cash flow to debt service for the most recently completed four consecutive full fiscal

25

 


quarters, taken as a single accounting period, to debt service for the most recently completed four consecutive full fiscal quarters, taken as a single accounting period, of not less than 1.30 to 1; and (ii) a ratio of cash flow for the most recently completed four consecutive full fiscal quarters, taken as a single accounting period, to debt service for the next succeeding four consecutive full fiscal quarters of not less than 1.3 to 1. Additionally, at all times, Tetra4 is required to ensure that its debt service reserve account is funded in an amount equal to the aggregate amount of the sum of all payments of principal, interest and fees made or required to be made by Tetra4 in respect of its indebtedness with respect to the IDC Loan Agreement for the immediately succeeding six-month period. The covenants in (a) and (b) will apply immediately following the date falling 18 months after the completion of the construction of the Virginia Gas Plant. Furthermore, the DFC Credit Facility Agreement contains negative covenants, which include restrictions on Tetra4's ability to make certain restricted payments, including any dividend or distribution on account of any interest in Tetra4, any payment of principal or interest on any indebtedness of Tetra4 to or for the benefit of any shareholder or other affiliate of Tetra4, and any purchase, redemption, acquisition or retirement of any limited liability company interests of Tetra4 or any indebtedness of Tetra4 held by any shareholder or any affiliate of Tetra4, or any payment to or on behalf of any shareholder or affiliate of any shareholder, subject to certain conditions. In November 2025, the DFC issued a notice of default in connection with a missed payment under the DFC Credit Facility Agreement, which default has since been cured with the DFC’s written consent.

Pursuant to the IDC Loan Agreement, Tetra4 is required to maintain certain financial covenants, including (a) a ratio of all interest bearing debt to EBITDA of not more than 3.0 to 1; (b) a ratio of current assets to current liabilities of not less than 1 to 1; (c) a ratio of cash flow for the most recently completed four consecutive full fiscal quarters, taken as a single accounting period, to debt service for the most recently completed four consecutive full fiscal quarters, taken as a single accounting period, of not less than 1.30 to 1; (d) a ratio of cash flow for the most recently completed four fiscal quarters, taken as a single accounting period, to debt service for the next succeeding four consecutive full fiscal quarters of not less than 1.3 to 1; and (e) at all times, a reserve tail ratio of not less than 25%. Additionally, at all times, Tetra4 is required to ensure that its debt service reserve account is funded in an amount equal to, on any given date, a Rand amount equal to the aggregate amount of the sum of all payments of principal, interest and fees made or required to be made by Tetra4 under the IDC Loan Agreement for the immediately succeeding six-month period, to be used as a payment buffer for Tetra4’s repayment obligations under and in terms of the IDC Loan Agreement. In addition, the IDC Loan Agreement contains negative covenants, which include that Tetra4 shall not make any shareholder dividend distribution, repay any shareholders’ loans and/or pay any interest on shareholders’ loans or make any payments whatsoever to its shareholders without the IDC’s prior written consent if (i) Tetra4 is in breach of any term of the IDC Loan Agreement or (ii) the making of such payment would result in a breach of any one or more of the financial ratios described above.

The financial covenants described in (a) to (e) in the above paragraph became effective on February 15, 2026. As of February 28, 2026 and May 31, 2026, Tetra4 was not in compliance with the covenants described in clauses (a)-(d) in the above paragraph, and has requested an extension of the effective date to May 1, 2028, which is subject to approval by the IDC. Tetra4 is actively engaged in discussions with IDC to amend the IDC Loan Agreement to align the calculation date with the completion of Phase 1 of the Virginia Gas Project. While Renergen expects to receive a waiver from IDC in connection with the renegotiation of the applicable calculation date, it is not guaranteed that IDC will consent, and if any future default occurs, that IDC would be willing to consent to any future amendments to the financial covenants. In connection with these matters, approximately $111.3 million of Renergen’s long-term borrowings have been reclassified as current liabilities as of February 28, 2026. Renergen’s ability to comply with these covenants may be affected by events and factors beyond its control. These restrictions may interfere with Renergen’s ability to obtain financing or to engage in other business activities, which may have a material adverse effect on Renergen’s business, financial condition or results of operations. There can be no assurance that Renergen will be able to obtain waivers or amendments on acceptable terms, or at all, or that its lenders will not exercise remedies available to them, including acceleration of outstanding indebtedness, which could have a material adverse effect on Renergen’s business, financial condition and results of operations.

If Renergen is unable to comply with the covenants contained in the DFC Credit Facility Agreement and the IDC Loan Agreement, it could constitute an event of default and Renergen’s lenders could declare all borrowings outstanding, together with all other amounts owing under the related financing documents and accrued and unpaid interest, to be immediately due and payable. If Renergen is unable to repay or otherwise refinance these borrowings when due, Renergen’s lenders could sell the collateral securing the DFC Credit Facility Agreement and the IDC

26

 


Loan Agreement, which constitute substantially all of Renergen’s assets. The occurrence of any of these events could have a material adverse effect on Renergen’s business, financial condition, results of operations, and prospects.

Renergen will continue to have the ability to incur debt and Renergen’s levels of debt may affect Renergen’s operations and Renergen’s ability to pay the principal of and interest on Renergen’s debt.

In the future, Renergen and its subsidiaries may be able to incur substantial additional debt from amendments to the DFC Credit Facility Agreement or the IDC Loan Agreement, from additional lending sources subject to the restrictions contained in those agreements, or through certain additional debt instruments Renergen may issue. As of May 31, 2026, Renergen had $115.1 million of outstanding borrowings.

Renergen’s indebtedness could be costly or have adverse consequences, such as:

•
requiring Renergen to dedicate a substantial portion of Renergen’s cash flows from operations to payments on Renergen’s debt;
•
limiting Renergen’s ability to obtain future financing for working capital, capital expenditures, acquisitions, debt obligations and other general corporate requirements;
•
making Renergen more vulnerable to adverse conditions in the general economy or Renergen’s industry and to fluctuations in Renergen’s operating results, including affecting Renergen’s ability to comply with and maintain any financial tests and ratios required under Renergen’s indebtedness;
•
limiting Renergen’s flexibility to engage in certain transactions or to plan for, or react to, changes in Renergen’s business and industry;
•
putting Renergen at a disadvantage compared to competitors that have less relative and/or less restrictive debt; and
•
subjecting Renergen to additional restrictive financial and other covenants.

If Renergen incurs substantial additional indebtedness in the future, these higher levels of indebtedness may affect Renergen’s ability to pay the principal of and interest on existing indebtedness and Renergen’s creditworthiness generally.

Renergen may not be able to generate sufficient cash to service all of Renergen’s indebtedness and may be forced to take other actions to satisfy Renergen’s obligations under applicable debt instruments, which may not be successful.

Renergen’s ability to make scheduled payments on or to refinance Renergen’s indebtedness obligations, including under the DFC Credit Facility Agreement and the IDC Loan Agreement, depends on Renergen’s financial condition and operating performance, which are subject to prevailing economic and competitive conditions and certain financial, business and other factors beyond Renergen’s control. Renergen may not be able to maintain a level of cash flow from operating activities sufficient to permit Renergen to pay the principal, premium, if any, and interest on Renergen’s indebtedness. For example, in November 2025, Tetra4 did not make a scheduled payment under the DFC Credit Facility when due. While the DFC subsequently waived the resulting payment default and consented to the use of funds held in its debt service reserve account to settle the missed payment, there is no guarantee that Renergen will not default on the DFC Credit Facility Agreement in the future, and that upon any such default, the DFC would consent to a settlement.

Additionally, Renergen anticipates incurring a substantial amount of indebtedness to fund the anticipated build cost to construct Phase 2, which will increase the risk that Renergen is unable to generate sufficient cash to service all of Renergen’s indebtedness. Although Renergen intends to fund some of the build cost to construct Phase 2 with equity offerings and operating cash flows, the indebtedness necessary to fund the remaining portion of the build cost will substantially increase Renergen’s outstanding indebtedness and the requisite cash flows to service such indebtedness.

If Renergen’s cash flow and capital resources are insufficient to fund debt service obligations, Renergen may be forced to reduce or delay investments and capital expenditures, sell assets, seek additional capital or restructure or

27

 


refinance indebtedness. Renergen’s ability to restructure or refinance indebtedness will depend on the condition of the capital markets and Renergen’s financial condition at such time. Any refinancing of indebtedness may be at higher interest rates and may require Renergen to comply with more onerous covenants, which could further restrict business operations. The terms of Renergen’s existing or future debt instruments may restrict Renergen from adopting some of these alternatives. In addition, any failure to make payments of interest and principal on outstanding indebtedness on a timely basis would likely result in a reduction of Renergen’s credit rating, which could harm Renergen’s ability to incur additional indebtedness. In the absence of sufficient cash flows and capital resources, Renergen could face substantial liquidity problems and might be required to dispose of material assets or operations to meet debt service and other obligations. Any future indebtedness may restrict Renergen’s ability to dispose of assets and impose limitations on Renergen’s use of proceeds from dispositions. Furthermore, Renergen may not be able to consummate those dispositions, and the proceeds of any such disposition may not be adequate to meet any debt service obligations then due. These alternative measures may not be successful and may not permit Renergen to meet scheduled debt service obligations.

Renergen’s outstanding indebtedness under the IDC Loan Agreement, the Molopo Loan, the ASP Isotopes Term Loan Facility and the SBSA Loan bear interest at a variable rate, which makes Renergen more vulnerable to increases in interest rates and could cause Renergen’s interest expense to increase and decrease cash available for operations and other purposes.

Borrowings under the IDC Loan Agreement, the Molopo Loan, the ASP Isotopes Term Loan Facility and the SBSA Loan bear interest at a variable rate, which increases and decreases based upon changes in the underlying interest rate. Any such increases in the interest rate or increases of Renergen’s borrowings under the IDC Loan Agreement, the Molopo Loan, the ASP Isotopes Term Loan Facility and the SBSA Loan will increase Renergen’s interest expense and reduce Renergen’s funds available for operations and other purposes. Although from time to time Renergen may enter into agreements to hedge a portion of Renergen’s interest rate exposure, these agreements may be costly and may not protect against all interest rate fluctuations. Accordingly, Renergen may experience material increases in Renergen’s interest expense as a result of increases in interest rate levels generally.

Renergen is party to an intercompany term loan facility with ASP Isotopes, and its intercompany indebtedness may increase substantially in connection with the Merger.

Renergen is party to the ASP Isotopes Term Loan Facility (as defined herein), as amended, pursuant to which ASP Isotopes may provide loans to Renergen of up to $120 million. Prior to or at the Closing, the parties to the ASP Isotopes Term Loan Facility, are expected to enter into that certain Sixth Addendum to the ASP Isotopes Term Loan Facility to further increase the aggregate principal amount to $200 million. The ASP Isotopes Term Loan Facility is unsecured and is repayable within 60 days following written demand by ASP Isotopes, which may be made at ASP Isotopes’ sole discretion in accordance with the terms of the ASP Isotopes Term Loan Facility. Any borrowings under the ASP Isotopes Term Loan Facility would increase Renergen’s overall indebtedness and debt service obligations and would result in a significant obligation owed to ASP Isotopes, which following the Merger will be the Combined Company’s controlling stockholder. Renergen may not generate sufficient cash to service this additional indebtedness, and the terms of the facility and Renergen’s other debt agreements may limit its financial and operating flexibility. In addition, ASP Isotopes may demand repayment of the ASP Isotopes Term Loan Facility at any time with 60 days notice, and Renergen may not have sufficient cash to repay ASP Isotopes upon demand. Any of the foregoing could have a material adverse effect on Renergen’s business, financial condition and results of operations.

Risks Related to Renergen’s Legal, Regulatory and Compliance Matters

Renergen’s exploration rights and production right in South Africa could be altered, suspended, or canceled for a variety of reasons, including uncertainties associated with national and local legislation.

Various national and local policies, laws and regulations, norms and standards govern Renergen’s exploration rights and production right, which are characterized by significant uncertainties associated with both their formulation as well as implementation. Under the applicable South African laws and regulations, Renergen is required to obtain certain permits, licenses and approvals for Renergen’s exploration and production activities, including, among others, exploration rights, production rights, environmental authorizations and integrated water

28

 


use licenses. Moreover, Renergen is required to comply with the terms and conditions attached to such permits, licenses and approvals, including by filing certain reports and plans with the relevant authorities from time to time. These permits, licenses and approvals are issued by ministries and/or agencies of the South African government and are crucial to Renergen’s business operations. Although Renergen has obtained or is otherwise applying for all consents necessary to conduct Renergen’s business, there can be no assurance that Renergen will obtain, retain, timely renew or comply with all of the terms and conditions attaching to such consents.

Any failure to obtain, renew or retain or any delay (and/or failure by relevant government authorities) in obtaining, retaining or renewing any required permits, licenses or approvals, may result in a delay in Renergen’s investment or development of a resource which may have a material adverse effect on Renergen’s business, results of operations, financial position and/or growth prospects. Additionally, Renergen’s existing licenses, permits and other authorizations may be suspended, terminated or revoked if Renergen fails to comply with the relevant requirements. Should Renergen fail to fulfil the specific terms of permits, licenses and other authorizations or if Renergen operates Renergen’s business in a manner that violates applicable law, regulators may impose fines or suspend or terminate such licenses, permits or other authorizations. The failure to comply with the terms and conditions attached to such consents timely and strictly in line with the applicable requirements could negatively affect Renergen’s operations, and subject Renergen to a variety of administrative or criminal penalties, other government actions or reputational harm, which may have a material adverse effect on Renergen’s business, results of operations, financial position and/or growth prospects.

Renergen’s production right expires on September 20, 2042.

Renergen’s Virginia-area exploration rights were set to expire on August 23, 2024; however, Renergen submitted an application on July 16, 2024 to incorporate those exploration rights into its production right by means of an amendment to the production right in accordance with Section 102 of the MPRDA, which Renergen expects would extend its ability to carry out petroleum exploration activities through the expiration date of its production right. The application was authorized on May 9, 2025, and following that authorization two appeals were lodged by various parties. The appeal process is ongoing, and Renergen expects it to be resolved in 2027. If Renergen’s exploration rights or production right expire or are not renewed or extended, or if the pending appeals are resolved adversely, Renergen could lose its right to explore, produce and develop the related properties, which could have a material adverse effect on its business, results of operations and financial condition.

Renergen is subject to legislation, regulations and policies and compliance with current and future administrative, regulatory and other obligations could result in increased costs.

Renergen’s exploration, technical cooperations, production and operational development activities are subject to South African laws and regulations governing various matters. The Mineral and Petroleum Resources Development Act 28 of 2002 (the “MPRDA”) remains the primary governing legislation, but the Upstream Petroleum Resources Development Act 23 of 2024 (the “UPRDA”) has been assented to and published but has not yet commenced. Upon commencement, the UPRDA is intended to replace the MPRDA with respect to upstream petroleum activities, which may introduce new regulatory requirements, compliance costs or uncertainties that could affect Renergen’s existing rights and operations. Among other things, the UPRDA provides for (i) a right of the State, through the State Petroleum Company, to a 20% carried interest in petroleum rights in both the exploration and production phases, the costs of which are borne by the holder, subject to limited rights of cost recovery; (ii) a requirement that every petroleum right have a minimum 10% participating interest held by black persons, as defined in the UPRDA; and (iii) an obligation on petroleum right holders to sell a percentage of their petroleum, as determined by the State Petroleum Company or another designated state-owned entity, to meet the State's strategic stock requirements.

The UPRDA also requires production rights granted under the MPRDA, including the Production Right held by Tetra4, to be converted into petroleum rights within a prescribed period after commencement. The extent to which these and other provisions of the UPRDA, and the regulations to be made under it, will apply to the Production Right, and when, is uncertain. If they apply, they could, among other things, materially dilute Renergen's economic interest in the Virginia Gas Project, increase Renergen's funding obligations and reduce the revenues and cash flows available to Renergen. The South African laws and regulations to which Renergen is subject also include

29

 


laws and regulations relating to environmental protection, the management of natural resources, the management and use of hazardous substances and explosives, exploration, production and post-closure reclamation and rehabilitation, exports, the regulation of the trading of gas, price controls, repatriation of capital and exchange controls, taxation, labor standards and other employment-related laws and occupational health and safety and historic and cultural preservation.

The costs associated with compliance with these laws and regulations are substantial, and possible future laws and regulations as well as changes to existing laws and regulations could cause additional expense, capital expenditures, restrictions on or suspensions of Renergen’s operations and delays in the development of Renergen’s assets.

Moreover, environmental and regulatory laws and regulations change frequently (due to general amendments or amendments brought about as a result of case law) and are generally becoming more stringent across the global natural gas industry. If Renergen’s environmental compliance obligations were to change as a result of changes to laws or regulations or as a result of changes in certain assumptions Renergen makes to estimate liabilities, or if unanticipated conditions were to arise in connection with Renergen’s operations, Renergen’s expenses and provisions would increase to reflect these changes. If material, these expenses and provisions could adversely affect Renergen’s business, operating results and financial condition.

Renergen is subject to risks associated with litigation and regulatory proceedings, which could have a material adverse effect on Renergen’s business, operating results and financial condition.

Furthermore, Renergen is currently, and has been in the past, involved in legal proceedings related to its debt arrangements and agreements. For example, the Airsol Subscription Agreement was not repaid due to a dispute between the parties in respect of repayment. On August 4, 2026, the legal dispute with Airsol was resolved and Renergen has agreed to pay the sum of the principal, accrued interest and certain fees for a total of $8.5 million in three equal installments beginning five business days after certain customary regulatory approvals are obtained and ending in November 2026. In addition, on November 14, 2024, Molopo (as defined below) initiated legal proceedings against Tetra4 in the High Court of South Africa, Gauteng Local Division, Johannesburg, by issuing summons alleging a breach of the Molopo Loan when Renergen sold a 5.5% stake in Tetra4 to a noncontrolling interest. As a consequence, Molopo has purported to cancel the Molopo Loan, which cancellation is disputed by Tetra4 on the basis that the investment by the minority interest did not trigger a payment by Tetra4 to its parent in the sale. According to the Lead Times Bulletin for the High Court in Gauteng, the soonest hearing date is estimated to take place in December 2030, and the Molopo Loan continues to be classified as non-current, and interest continues to be accounted for at the prime lending rate plus 2% pursuant to the Molopo Loan.

From time to time, Renergen is or may also become party to litigation, arbitration, contested case hearings, regulatory proceedings, administrative appeals and other legal or judicial proceedings arising in the ordinary course of our business or otherwise, including proceedings relating to the issuance, renewal, amendment, or validity of the rights, permits, licenses and authorizations required for our projects and operations. For example, on January 26, 2024, the Director General of the Department of Mineral Resources and Energy granted Tetra4 consent under section 102 of the MPRDA to amend its production right to include helium as a by‑product of petroleum/natural gas. Vicsamoki (as defined below) lodged an internal appeal in terms of section 96 of the MPRDA read with regulation 74, which the Minister dismissed on August 14, 2025, thereby confirming the section 102 decision. Subsequently, on February 11, 2026, Vicsamoki instituted High Court proceedings against the Minister and Tetra4 seeking to have the section 102 decision declared void, alternatively reviewed and set aside. The matter is set for hearing on October 26, 2026. In addition, Renergen has disputed NERSA’s jurisdiction claim that Renergen requires a license from NERSA to trade in gas in South Africa, as well as to construct and operate liquefaction plants. The High Court ruled that the Gas Act No. 48 of 2001, does not apply to any of the production activities and incidental activities authorized under a production right granted in terms of the Mineral and Petroleum Resources Development Act. NERSA filed its notice of intention to appeal the decision of the High Court on May 23, 2025. The hearing of the application was confirmed for August 4, 2025. On August 12, 2025, the High Court dismissed NERSA’s application for leave to appeal. On September 11, 2025, NERSA filed a petition for leave to appeal to the Supreme Court of Appeal (the “SCA”). On November 26, 2025, the SCA granted NERSA leave to appeal, and on January 26, 2026, NERSA filed its notice of appeal with the SCA. Accordingly, the matter is pending before the SCA, and proceedings will advance through the appellate process in due course.

30

 


Litigation, arbitration, regulatory proceedings and other types of disputes are costly and involve inherent uncertainties and, as a result, Renergen faces risks associated with adverse judgments or outcomes in these matters. Even in cases where Renergen may ultimately prevail on the merits of any such dispute, Renergen may face significant costs defending its rights, the proceedings may divert the attention of management and other personnel from Renergen’s operations, limit Renergen’s ability to obtain financing and lose certain rights or benefits during the pendency of any such litigation, arbitration, regulatory proceeding or other dispute, or suffer reputational damage as a result of Renergen’s involvement therein. There can be no assurance as to the outcome of any litigation, arbitration, regulatory proceeding or other dispute, and the adverse determination of material litigation could have a material adverse effect on Renergen’s business, operating results and financial condition.

An adverse ruling in the pending NERSA appeal to the Supreme Court of Appeal could subject Renergen to additional licensing requirements and regulatory oversight.

Renergen’s subsidiary, Tetra4, has disputed NERSA’s jurisdiction over its gas trading and liquefaction activities. In May 2025, the High Court ruled in Tetra4’s favor, holding that the Gas Act does not apply to production activities authorized under a production right granted in terms of the MPRDA. However, NERSA has been granted leave to appeal to the Supreme Court of Appeal, and the matter is currently pending. If the SCA reverses the High Court’s decision, Renergen could be required to obtain a NERSA license for its gas trading, liquefaction and related activities, which could subject Renergen to additional regulatory requirements, tariff regulation and compliance costs, and could delay or disrupt Renergen’s operations. In addition, in March 2026, the Minister of Electricity and Energy introduced the Gas Bill (B6-2026) in the National Assembly, which seeks to repeal the Gas Act and replace it with an updated regulatory framework. The implications of this proposed legislation for Renergen’s operations are uncertain.

Renergen’s failure to comply with applicable anti-corruption, anti-bribery, anti-money laundering and similar laws and regulations could negatively impact Renergen’s reputation and results of operations.

The legal and regulatory framework in which Renergen operates is complex, and Renergen’s governance and compliance policies and processes may not prevent potential breaches of law or accounting or other governance practices. Renergen’s operating and ethical policies, among other standards and guidance, may not prevent instances of fraudulent behavior and dishonesty, nor guarantee compliance with legal and regulatory requirements.

Renergen is required to comply with anti-corruption laws and regulations imposed by governments around the world with jurisdiction over Renergen’s operations, which may include South African anti-bribery and corruption legislation, as well as the laws of the other countries (for example, the U.S. Foreign Corrupt Practices Act of 1977) where Renergen does business or has a close connection. These laws and regulations may restrict Renergen’s operations, trade practices, investment decisions and partnering activities. These and other applicable laws prohibit Renergen and Renergen’s officers, directors, employees and business partners acting on Renergen’s behalf, including agents, from corruptly offering, promising, authorizing or providing anything of value to government officials for the purposes of influencing official decisions or obtaining or retaining business or otherwise obtaining favorable treatment. They also require that Renergen maintain accurate books and records and have a system of internal controls sufficient to, among other things, provide reasonable assurances that transactions are executed and assets are accessed and accounted for in accordance with management's authorization. Renergen must comply with the South African anti-corruption law, the Prevention and Combating of Corrupt Activities Act, No. 12 of 2004, as amended (“PRECCA”), which prohibits public and private bribery and criminalizes various categories of corrupt activities. PRECCA also contains a reporting obligation to authorities of known or suspected corrupt activities which is triggered when the value of any known or suspected acts of corruption exceeds R100,000. Failure to report said corrupt activities is a criminal offense under PRECCA and imposes significant penalties on those convicted of corrupt activities. Regulation 43 of the Companies Act also contains a number of anti-corruption compliance obligations that Renergen must adhere to. Some applicable anti-corruption laws may also prohibit so-called commercial or private bribery of private individuals. Renergen is subject to the jurisdiction of various governments and regulatory agencies around the world, which may bring Renergen’s personnel and representatives into contact with government officials responsible for, among other things, issuing or renewing permits, licenses or approvals or for enforcing other governmental regulations.

31

 


Renergen’s failure to successfully comply with these laws and regulations may expose Renergen to reputational harm, as well as significant sanctions, including criminal fines, imprisonment, civil penalties, disgorgement of profits, injunctions and debarment from government contracts, as well as other remedial measures.

Investigations of alleged violations can be expensive and disruptive. Renergen continuously develops and maintains policies and procedures designed to comply with applicable anti-corruption, anti-bribery, anti-money laundering and similar laws. However, there can be no guarantee that Renergen’s policies and procedures will effectively prevent violations by Renergen’s employees or business partners acting on Renergen’s behalf, for which Renergen may be held responsible, and any such violation could adversely affect Renergen’s reputation, business, results of operations, and financial condition.

Once an amendment to the South African loss carry forward rules comes into operation, it could have an adverse effect on Renergen’s financial results.

Renergen’s principal operating subsidiaries are South African tax residents. The loss carry forward rules are regulated by section 20 of the South African Income Tax Act No. 58 of 1962 (as amended from time to time) (the “South African Income Tax Act”). In determining taxable income as per enacted legislation, corporate taxpayers must set off their full extent of the balance of assessed loss carried forward from the preceding tax year against their income, with any unutilized assessed loss balance carried forward to future years of assessment to be set off against future income.

In an attempt to broaden the corporate income tax base, the South African Taxation Laws Amendment Act No. 20 of 2021 was promulgated on January 19, 2022, resulting in the amendment of section 20 of the South African Income Tax Act regulating use of assessed losses by companies. Pursuant to this amendment, companies are permitted to set-off the balance of an assessed loss carried from the prior year of assessment (i.e., the historic position), but only to the extent that the set-off does not exceed the higher of R1 million and 80% of the amount of taxable income determined for that year (before taking into account such balance of assessed loss). The unutilized balance of assessed loss will be carried forward to the following year of assessment. The amended loss utilization provisions will apply to years of assessment which end on or after March 31, 2023.

Due to the amendment to section 20 of the South African Income Tax Act, Renergen may experience delays in the utilization of the balance of Renergen’s assessed losses carried forward, which could have an adverse effect on Renergen’s financial results.

Amendments to tax legislation, tax rates or the administration or interpretation thereof may impact Renergen’s business, results of operations, financial condition and/or prospects.

Renergen is subject to various direct and indirect taxes. Tax legislation or the administration or interpretation thereof is subject to change occasioned by amendments, court decisions and the respective revenue authorities’ pronouncements on accepted practice in South Africa. These changes could affect Renergen’s overall effective tax rate, thereby impacting Renergen’s earnings, or could impact demand for Renergen’s products, which could, in turn, have a material adverse effect on Renergen’s business, financial results and/or prospects.

Renergen cannot predict the impact of future changes in tax legislation, or interpretation thereof. Amendments to existing tax legislation, or the introduction of new rules in South Africa, may have an impact on the investment decisions of either existing or potential shareholders.

Renergen may be exposed to historical environmental liability risk in respect of Renergen’s closed, closing or sold assets.

Section 28 of the South African National Environmental Management Act 107 of 1998 (“NEMA”) and section 19 of the National Water Act No. 36 of 1998 (the “NWA”) both impose a statutory duty of care for significant environmental pollution or degradation and require remedial measures to be taken in order to address any such environmental degradation, regardless of when it occurred. This duty applies retrospectively and may expose Renergen to historical environmental liability risks in respect of Renergen’s closed, closing or sold assets. Under

32

 


NEMA, the liability of the gas facility continues post-closure indefinitely, notwithstanding the issuance of a closure certificate by the relevant minister, especially where the treatment of water is incorporated. Notwithstanding the onerous statutory duty imposed by NEMA and NWA, Renergen may, in the future, be subject to further incremental legislation that imposes increased environmental liability and may result in significant costs being incurred well above the costs anticipated by Renergen. Any assessment on or adverse finding against Renergen of historical environmental liability may result in significant costs being incurred by Renergen, which may, in turn, have a material adverse effect on Renergen’s business, results of operations, and financial condition.

Risks Related to Operating in South Africa

Renergen may not be able to effectively and efficiently manage the disruption to Renergen’s operations as a result of the ongoing electricity generation crisis in South Africa, which could adversely affect Renergen’s results of operations, financial position, cash flows and future growth.

In 2022 and 2023, South Africa experienced multiple electricity supply crises due to the inability of Eskom, the sole, state-owned energy supplier, to reliably provide electrical power throughout the country. Both the government of South Africa and the U.S. Embassy & Consulates in South Africa declared a “State of Disaster” in response to ongoing power shortages. Previously, South Africa has endured several reductions in the power supply, such as South Africa’s order to Eskom in 2021 to reduce by one-third its operating capacity to limit its greenhouse gas emissions (which has been subsequently been significantly amended, with a delay in decommissioning of multiple units). The year 2022 saw more than twice as many blackouts as any other year, as aging coal-fired power plants broke down and Eskom struggled to buy diesel for emergency generators. Load-shedding resulted in 2023 in localized power outages of up to six hours or more per day throughout the country. Consequentially, Renergen has experienced, and could continue to experience, increased electricity prices as result of the energy supply crisis. While the supply situation has improved since 2024 with Eskom’s Energy Availability Factor approaching excess capacity, there is no guarantee that load-shedding will not be required in the future due to supply pressures. Renergen’s results of operations, financial position, cash flows and future growth could be adversely affected by the ongoing electricity supply crisis in South Africa, including due to capacity reductions, load shedding and/or electricity price increases.

Economic, political or social instability in South Africa may have a material adverse effect on Renergen’s operations and profits.

Renergen’s petroleum operations are located in South Africa. High levels of unemployment and a shortage of critical skills in South Africa, despite increased government expenditure on education and training, remain issues that impact the local economy. Changes to, or increased instability in the economic, political or social environment in South Africa or surrounding countries could create uncertainty, which discourages investment in the region and may affect investments in Renergen. In addition, socio-political instability and unrest may also disrupt Renergen’s business and operations, compromise safety and security, increase costs, affect employee morale, impact Renergen’s ability to deliver Renergen’s operational plans, create uncertainty regarding Renergen’s exploration and production licenses, and cause reputational damage. Such instability could also lead to disruptions to transportation routes or supply chains, increased security costs, difficulty moving personnel or supplies into or out of affected areas, sanctions or other governmental restrictions, or reductions in available capital for development projects, any of which could have a material adverse effect on Renergen’s business, results of operations and financial condition.

Community disruptions could result in access to Renergen’s petroleum operations being obstructed, Renergen’s property being damaged and production being interrupted. Any threats, or actual proceedings, to nationalize any of Renergen’s assets could cause a cessation or curtailment of Renergen’s operations, resulting in a material adverse effect on Renergen’s business, operating results and financial condition. If any of these risks materialize, this could cause a rapid decline in the value of Renergen’s securities, thereby possibly causing investors to lose their respective investments.

High levels of unemployment and a shortage of critical skills in South Africa, despite increased government expenditure on education and training, remain issues that impact the local economy. South Africa’s unemployment rate was 31.9% in the third quarter of 2024. Several political and economic factors have led to, and may continue to

33

 


lead, to further downgrades in national credit ratings, and may adversely affect the South African petroleum industry as a whole, as well as Renergen’s operations.

More specifically, South African petroleum companies are experiencing increasing trends of incitement, breaches of perimeter security, vandalism and robbery, as well as the intimidation and murder of employees.

In addition, economic and political instability and geopolitical events in regions outside of South Africa could result in unavoidable uncertainties and events. These include the ongoing war between Russia and Ukraine, which began in February 2022, and the retaliatory measures that have been taken, or could be taken in the future, by the United States and other countries. They also include the armed conflict between the United States, Israel and Iran that began in February 2026, including the related disruption to shipping through the Strait of Hormuz. These uncertainties and events have negatively affected, and could continue to negatively affect, the risk appetite for investments in the equity markets, South Africa and energy companies in particular. They have also caused, and could continue to cause, volatility in currency exchange rates, commodity prices, interest rates, and worldwide political, regulatory, economic or market conditions, and could contribute to instability in political institutions, regulatory agencies, and financial markets.

More recently, relations between the United States and South African governments have become strained, and the U.S. has taken, and may in the future take, actions adverse to South Africa. These include tariffs on South African imports, most recently a 12.5% tariff on many South African goods imposed in July 2026 under Section 301 of the Trade Act of 1974, which to best of Renergen’s knowledge does not currently apply to helium. They also include the reconsideration of trade preferences historically extended to South Africa under the African Growth and Opportunity Act (“AGOA”). Any of these factors could have a material adverse effect on Renergen's business, operating results and financial condition.

In particular, AGOA provides eligible sub-Saharan African countries, including South Africa, with duty-free access to the U.S. market for many products. AGOA lapsed in September 2025 and was subsequently reauthorized, most recently through December 31, 2028. However, South Africa’s continued eligibility as a beneficiary country remains uncertain. The President reviews eligibility annually, and members of Congress have proposed legislation to remove South Africa from the program, particularly in light of current tensions between the U.S. and South African governments. The removal of South Africa as a beneficiary country, a failure to further reauthorize AGOA after 2028, or the extension of existing or additional tariffs or other trade restrictions to South African goods, including helium, could adversely affect the South African economy, the value of the South African rand and the cost and availability of financing, equipment and materials for Renergen’s operations. Any of these could have a material adverse effect on Renergen’s business, results of operations and financial condition.

South African exchange control regulations could materially constrain Renergen’s financial flexibility.

South Africa’s existing Exchange Control Regulations restrict the ability of South African companies to convert or transfer sums in foreign currencies to or from South Africa. Transactions between South African residents (including companies) and non-residents (excluding residents of the Common Monetary Area (“CMA”)) are subject to exchange controls enforced by the SARB.

As a result, Renergen’s ability to raise or deploy loan funding outside the CMA is currently subject to consent from either the SARB, or where such authority has been delegated, an “Authorized Dealer” with full capacity at an approved bank operating in South Africa, particularly any debt funding that Renergen may require from offshore lenders. These limitations placed on flowing all funds in an unregulated manner could hinder Renergen’s financial and strategic flexibility, particularly Renergen’s ability to raise funds outside South Africa.

In February 2020, the Minister of Finance announced a new capital flow management system in the 2020 Budget Speech, in terms of which all foreign-currency transactions will be allowed, except for a risk-based list of capital flow measures. The 2021 Budget Speech on February 24, 2021 stated the new capital flow management framework would continue to be developed and that new regulations in this regard will be published “shortly.” To date, the new framework and regulations have not yet been published, although there has been an ongoing relaxation of current exchange controls with a view to easing controls and implementing a prudential-based system.

34

 


There is no assurance that restrictions on currency exchange will not be reinstated or implemented in the future or that these restrictions will not limit the ability of Renergen’s subsidiaries to transfer cash or borrow from outside the CMA, which could have a material adverse effect on Renergen’s business, results of operations, financial condition and prospects.

Renergen’s business, results of operations, and financial condition may be adversely affected by inflation in South Africa.

South Africa may continue to experience high levels of inflation in the future, which may increase Renergen’s costs, such as labor and energy, as well as Renergen’s revenues. Inflationary pressures may also curtail Renergen’s ability to access international financial markets and may lead to further government intervention in the economy. This may include the introduction of government policies that may materially and adversely affect the overall performance of the South African economy, which in turn may materially and adversely affect Renergen.

HIV/AIDS, tuberculosis and other contagious diseases pose risks to Renergen in terms of lost productivity and increased costs.

The prevalence of HIV/AIDS in South Africa poses risks to Renergen in terms of potentially reduced productivity and increased medical and other costs. Compounding this are the concomitant infections, such as tuberculosis, that can accompany HIV illness, particularly during the latter stages, and cause additional healthcare-related costs. If there is a significant increase in the prevalence of HIV/AIDS infection and related diseases, or other diseases among the workforce, this may have a material adverse effect on Renergen’s business, results of operations and financial condition.

The costs of healthcare services may increase in the future depending on underlying legislation and the profile of Renergen’s employees.

Healthcare costs in South Africa have increased in recent years. Healthcare, and particularly occupational healthcare, is provided by Discovery, Bonitas and Medihelp. There is a risk that the cost of providing such services could change in the future, depending on, among other things, the nature of underlying legislation and the profile of employees. This cost, should it transpire, is difficult to estimate. Significant increases in the costs of healthcare provided to Renergen’s employees at Renergen’s facilities or mandated contributions to any national healthcare fund could have an adverse effect on Renergen’s business, financial condition and results of operations.

 

35