SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 


 

FORM 6-K

 

Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16 of the

Securities Exchange Act of 1934

 

For the month of April, 2022

 

Commission File Number 1-34129

 


 

CENTRAIS ELÉTRICAS BRASILEIRAS S.A. - ELETROBRÁS

(Exact name of registrant as specified in its charter)




BRAZILIAN ELECTRIC POWER COMPANY

(Translation of Registrant's name into English)




Rua da Quitanda, 196 – 24th floor,
Centro, CEP 20091-005,
Rio de Janeiro, RJ, Brazil

(Address of principal executive office)



Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F. 

Form 20-F ___X___ Form 40-F _______

Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.

Yes _______ No___X____

 
 

 

 

 
 

 

 

 
 

 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

I. Market Data of Eletrobras Companies
                 
I.1 Installed Capacity and Physical Guarantee – MW
Company Integral Responsibility (a) Integral Responsibility under terms of Law 13,182/15 (b) Integral Responsibility under O&M Regime (c) SPE (d) SPE under O&M Regime (e) Net Physical Aggregation 4Q21 Total
Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee Installed Capacity Physical Guarantee
Eletrobras Holding                                -                                        -                                     -                                  -                                       -                              -                               1,870                     785                             -                                -                               -                             -                            1,870                       785
Eletronorte                           9,826                               4,940                                  -                                  -                                      78                          63                           2,407                    1,011                             -                                -                             845                       729                        12,311                    6,014
Chesf                            1,012                                   195                             1,050                             505                              8,395                      5,103                           2,643                   1,249                             -                                -                                 6                           0                        13,100                    7,051
Furnas                           2,002                                1,202                             2,082                             949                              4,645                     2,299                           3,068                   1,886                           403                           109                            37                           8                       12,200                    6,444
Eletronuclear                           1,990                                1,715                                  -                                  -                                       -                              -                                    -                           -                                -                                -                               -                             -                            1,990                     1,715
CGT Eletrosul                              826                                   511                                  -                                  -                                       -                              -                                1,216                     680                             -                                -                               -                              2                        2,042                      1,191
Itaipu Binacional                           7,000                               4,289                                  -                                  -                                       -                              -                                    -                           -                                -                                -                               -                             -                           7,000                    4,289
Amazonas G&T (1)                                -                                        -                                     -                                  -                                       -                              -                                    -                           -                                -                                -    -                      1,021 -                     804                              -                            -   
Total 22,657 12,851 3,132 1,453 13,117 7,464 11,203 5,611 403 109 -133 -64 50,512 27,488
   
 
(1) Eletronorte merged Amazonas GT as of 07/01/2021. At Eletronorte, the values ​​of the transfer of assets from Amazonas GT and the exclusion of TPPs Sen. Arnon Afonso Farias de Mello, Santana, Santana II and Santa Rita were accounted for.
                             
                             
I.2 Transmission Lines - Km
Eletrobras Companies Integral Responsibility (a) Integral Responsibility
under O&M regime (b)
Others (c)  SPE (d) Net Aggregation 4Q21 Total KM
(a+b+c+d)
SPE Voltage higher than or equal to 230 KV SPE TOTAL            
       
Chesf                       2,483.42                         19,221.50                             97.00                      1,768.15                              99.72              23,570.07                        1,768.15               1,768.15        
Eletrobras Holding                                -                                        -                                     -                                  -                                -                                    -                           -           
Eletronorte                       1,846.20                           8,828.18                           424.65                     1,044.89                  12,143.91                       1,044.89              1,044.89        
CGT Eletrosul                       2,552.12                           9,143.19                           258.81                        467.00                              49.27                12,421.12                         467.00                467.00        
Furnas                        1,149.70                         19,955.90                           596.40                     4,250.17                 25,952.17                      4,035.07              4,250.17        
Total              8,031.44                57,148.77                1,376.86              7,530.21                    148.99        74,087.27                7,315.11        7,530.21        

 

1 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

II. Generation Data
                                             
II.1 Installed Capacity - MW
                                             
II.1.2 Generation Assets and Generated Energy 
                                             
II.1.2.1 Generation Assets and Generated Energy – Enterprises under Integral Responsability
                                             
Eletrobras Companies Enterprise   Energy source Beginning of Concession Beginning of Operation End of Operation             Type of Fuel Metric Unit Fuel used for electricity production        
Location Installed Capacity Physical Guarantee Generated Energy (MWh) 1Q21 2Q21 3Q21 4Q21
(State) (MW) (MW Average) 1Q21 2Q21 3Q21 4Q21 Amount R$ Million Amount R$ Million Amount R$ Million Amount R$ Million
Eletronorte Complexo de Tucuruí PA Hydro Jul-74 Dec-84 Jan-26 8,535.00 4,019.10                      9,255,043                       9,681,454                      4,498,884                      9,007,575  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
UHE Samuel RO Hydro Sep-79 Jul-89 Jul-32 216.75 92.70                          241,004                          255,413                          134,776                          186,532  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
UHE Curuá-Una (1) PA Hydro Jul-98 Jan-77 Sep-44 30.30               24.80                           58,678                            59,124                           64,344                            61,753  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
UTE Araguaia (2) MT Thermal Jul-15 Apr-16 -                     23.10  -                                    -                                      -                                      -                                      -     NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
UTE Senador Arnon Afonso Farias de Mello (15) RR Thermal Nov-00 Dec-90 (15)                     85.99  NA                                    -                                      -                                      -                                      -     NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
UTE Santana (16) AP Thermal Nov-20 Nov-20 May-21                     36.00               30.00                                 120                                   -                                      -                                      -     Diesel oil   Liter                      40,422              0.14                           -                         -  NA   NA   NA   NA 
UTE Santana II (16) AP Thermal Nov-20 Nov-20 May-21                     29.52               25.00                                204                                   -                                      -                                      -     Diesel oil   Liter                      68,602             0.23                           -                         -  NA   NA   NA   NA 
UTE Santa Rita (16) AP Thermal Nov-20 Nov-20 May-21                     24.28               20.00                                 107                                   -                                      -                                      -     Diesel oil   Liter                      10,803             0.04                           -                         -  NA   NA   NA   NA 
UHE Balbina (18) AM Hydro Mar-77 Jan-89 Mar-27                   249.75              132.30  NA   NA                           462,015                          445,313  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
UTE Aparecida (18) AM Thermal N/D Feb-84 Jul-30                   166.00              150.00  NA   NA                          292,400                         243,672  Natural gas   m3   NA   NA   NA   NA           85,572,220               138.23              86,144,947               139.89
UTE MAUÁ 3 (18) AM Thermal Nov-14 Sep-17 Nov-44                   590.75             507.20  NA   NA                        1,036,288                        1,013,425  Natural gas   m3   NA   NA   NA   NA          219,527,943               354.64            247,128,730               401.65
UTE Ponta Negra (PIE Gera) (7) (18) AM Thermal NA NA NA  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
UTE Manauara (PIE Manauara) (7) (18) AM Thermal NA NA NA  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
UTE Jaraqui (PIE Breitener Jaraqui) (7) (18) AM Thermal NA NA NA  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
UTE Tambaqui (PIE Breitner Tambaqui) (7) (18) AM Thermal NA NA NA  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
UTE Cristiano Rocha (PIE RAESA) (7) (18) AM Thermal NA NA NA  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Isolated System
UTE ANAMÃ (18) AM Thermal N/D Dec-18 Nov-30                       2.17                  2.14  NA   NA                          2,612.99                             2,797  Natural gas   m3   NA   NA   NA   NA                 915,526                   1.56                 1,184,100                   2.05
UTE ANORI (18) AM Thermal N/D Dec-18 Nov-30                       4.57                 4.52  NA   NA                         4,349.52                             4,444  Natural gas   m3   NA   NA   NA   NA              1,431,504                   2.45                1,706,461                   2.96
UTE CAAPIRANGA (18) AM Thermal N/D Dec-18 Nov-30                       2.17                  2.14  NA   NA                         2,446.90                             2,374  Natural gas   m3   NA   NA   NA   NA                 871,986                   1.49                  958,350                   1.66
UTE CODAJÁS (18) AM Thermal N/D Dec-18 Nov-30                       5.48                 5.43  NA   NA                          6,613.96                             6,758  Natural gas   m3   NA   NA   NA   NA              2,172,706                   3.71               2,605,472                   4.52
Chesf Curemas PB Hydro (13) Jan-57 Feb-26 3.52 1.00                                   -                                      -                                      -    0  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Casa Nova I A (19) BA Wind Jun-19 Dec-20 Jun-54 27.00 6.80                            13,607                            19,342                           30,285                             17,916  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Casa Nova II (20) BA Wind May-14 Dec-17 May-49 32.90 9.40                            15,564                            21,920                            32,361                            17,704  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Casa Nova III BA Wind May-14 Feb-18 May-49 28.20 9.40                            14,837                           20,304                           29,663                            17,784  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Acauã (14) (17) BA Wind Apr-14 Nov-19 Apr-49 6.00 3.10                             4,857                             3,585                             5,853                             3,064  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Angical 2 (14) (17) BA Wind Apr-14 Sep-19 Apr-49 10.00 5.10                             9,625                              8,108                            13,067                              8,016  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Arapapá (14) (17) BA Wind Apr-14 Nov-19 Apr-49 4.00 2.20                             2,343                              1,527                             3,340                             2,224  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Caititu 2 (14) (17) BA Wind Apr-14 Jan-20 Apr-49 10.00 5.10                             6,955                             5,665                             11,020                             5,973  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Caititu 3 (14) (17) BA Wind Apr-14 Jan-20 Apr-49 10.00 4.70                             5,604                             3,909                             8,593                               4,181  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Carcará (14) (17) BA Wind Apr-14 Feb-20 Apr-49 10.00 4.60                             6,984                              5,619                            10,957                              6,518  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Coqueirinho 2 (14) (17) BA Wind May-14 Sep-19 May-49 16.00 7.40                            10,948                             8,463                             16,516                             8,642  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Corrupião 3 (14) (17) BA Wind Apr-14 Feb-20 Apr-49 10.00 4.20                             6,607                             4,724                              8,218                             4,883  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Papagaio (14) (17) BA Wind May-14 Oct-19 May-49 10.00 4.90                              8,019                             5,879                             11,087                             6,753  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Tamanduá Mirim 2 (14) (17) BA Wind Jun-14 Nov-19 Jun-49 16.00 7.40                             9,594                             7,654                             13,821                             8,382  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Teiú 2 (14) (17) BA Wind Apr-14 Nov-19 Apr-49 8.00 4.20                             4,289                             3,022                             6,869                             3,686  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 

 

2 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

Furnas Mascarenhas de Moraes MG Hydro Oct-73 Apr-57 Jan-24 476.00 289.50                          361,779                         403,957                          448,421                          291,374  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Simplício RJ Hydro Aug-06 Jun-13 Aug-41 305.70 175.40                           461,501                           215,081                          108,074                         349,825  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Anta RJ Hydro Aug-06 Aug-18 Aug-41 28.00 15.90                           37,829                           32,439                            32,581                           32,685  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Batalha MG Hydro Aug-06 May-14 Aug-41 52.50 48.80                            65,771                           68,969                           39,364                           23,322  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Serra da Mesa (48,46%) (3) (11) GO Hydro mai/81 e nov/04 Apr-98 Sep-40                1,275.00 637.50                          579,168                         522,686                       1,308,497                          653,791  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Manso (70%) (3) MT Hydro Feb-00 Nov-00 Feb-35 210.00 87.80                           127,361                          129,563                          100,825                            82,120  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Santa Cruz (4) (12) RJ Thermal ago/63 e mar/67 Jul-67 Jul-15 350.00 280.84                          270,176                          481,098                          320,194                         658,625  Natural gas   m3                82,633,117           181.13          145,071,216                189.32         131,369,098               173.54            189,932,829               363.99
Roberto Silveira (Campos) (5) RJ Thermal Jul-07 Dec-68 Jul-27 25.00 20.90                                   -                                      -                                      -    0  ND   ND   ND   ND   ND   ND   ND   ND   ND   ND 
Eletronuclear Angra I (8) RJ Nuclear Jul-70 Jan-85 Dec-24 640.00 509.80                       1,275,465 810,548 1,312,731 1,313,888 Uranium kg 33,487 46.19 24,712 32.2 35,120 50.2 34,531 53.1
Angra II (8) RJ Nuclear May-74 Sep-00 Aug-40 1,350.00 1,204.70                        2,371,184 1,712,212 2,114,296 2,553,712 Uranium kg 84,907 79.56 61,179 40.2 80,634 44.7 81,625 97.3
CGT Eletrosul UHE Governador Jayme Canet Júnior (6) PR Hydro Jul-07 Nov-12 Jul-42 177.94 96.90                         272,283                           105,167                           131,648                          198,283  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
UHE Passo São João RS Hydro Aug-06 Mar-12 Aug-41 77.00 41.10                           49,345                           72,697                           75,492                            61,670  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
UHE São Domingos MS Hydro Dec-02 Jun-13 Dec-37 48.00 36.40                           72,642                           50,595                            47,717                           70,909  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
PCH Barra do Rio Chapéu SC Hydro May-04 Feb-13 May-34 15.15 8.61                           20,320                            15,554                             11,920                             18,141  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
PCH João Borges SC Hydro Dec-05 Jul-13 Dec-35 19.00 10.14                            15,230                             3,990                            10,753                            12,778  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Eólica Cerro Chato I RS Wind Aug-10 Jan-12 Aug-45 30.00 11.33                            18,467                           23,656                           27,765                           25,567  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Eólica Cerro Chato II RS Wind Aug-10 Aug-11 Aug-45 30.00 11.33                            18,868                           24,366                           28,604                            26,103  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Eólica Cerro Chato III RS Wind Aug-10 Jun-11 Aug-45 30.00 11.33                            18,775                           24,023                           28,276                           26,064  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
UEE Coxilha Seca RS Wind May-14 Dec-15 May-49 30.00 13.20                            22,187                           28,357                             31,961                           29,900  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
UEE Capão do Inglês RS Wind May-14 Dec-15 May-49 10.00 4.50                             6,509                             9,863                             11,040                            10,523  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
UEE Galpões RS Wind May-14 Dec-15 May-49 8.00 3.50                             5,926                             7,897                              9,017                               8,116  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Megawatt Solar SC Solar Jun-14 Sep-14 - 0.93  NA                                   311                                 213                                226                                287  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Candiota III – Fase C (9) RS Thermal Sep-08 Jan-11 Jul-41 350.00 262.40                         542,055                          621,900                         522,706                         528,976 mineral coal Tonne                   501,775           37.83                 600,131 45.73                 511,918 41.38                   518,964 43.34
Fuel Oil kg                   500,490             0.87              1,204,581 3.03                444,910 1.32                  255,690 0.76
Diesel Oil Liter                   142,970             0.44                  13,030 0.04                155,500 0.61                   183,530 0.77
Fuel Lime Tonne              22,695,030            19.54           26,139,450 21.26           29,614,150 23.52              22,581,510 16.65
Itaipu Binacional Itaipu Binacional (10) Brazil (Paraná) and Paraguay (Alto Paraná) Hydro N/A Mar-85 - 14,000 8,577.00                    20,275,702 14,258,714 13,871,721 17,963,116 NA NA NA NA NA NA NA NA NA NA
Amazonas GT
(21)
UHE Balbina (18) AM Hydro NA NA NA NA NA                          196,979                           316,461 NA NA NA NA NA NA NA NA NA NA NA NA
UTE Aparecida (18) AM Thermal NA NA NA NA NA                          158,240                         220,882 NA NA Natural Gas m3              46,160,879           72.99 60,585,298 97.70 NA NA NA NA
UTE MAUÁ 3 (18) AM Thermal NA NA NA NA NA                        1,056,515                          863,710 NA NA Natural Gas m3            205,854,474          326.19 200,930,442 323.91 NA NA NA NA
UTE Ponta Negra (PIE Gera) (7) (18) AM Thermal NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
UTE Manauara (PIE Manauara) (7) (18) AM Thermal NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
UTE Jaraqui (PIE Breitener Jaraqui) (7) (18) AM Thermal NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
UTE Tambaqui (PIE Breitner Tambaqui) (7) (18) AM Thermal NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
UTE Cristiano Rocha (PIE RAESA) (7) (18) AM Thermal NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Isolated System
UTE ANAMÃ (18) AM Thermal NA NA NA NA NA                             2,429                             2,458 NA NA Natural gas m3                    891,214              1.52 1,040,730 1.78 NA NA NA NA
UTE ANORI (18) AM Thermal NA NA NA NA NA                             4,042                              4,102 NA NA Natural Gas m3                 1,294,971              2.21 1,199,853 2.05 NA NA NA NA
UTE CAAPIRANGA (18) AM Thermal NA NA NA NA NA                              2,180                             2,348 NA NA Natural gas m3                   781,623              1.34 821,161 1.40 NA NA NA NA
UTE CODAJÁS (18) AM Thermal NA NA NA NA NA                             6,020                             6,439 NA NA Natural Gas m3                2,129,648             3.64 2,272,401 3.88 NA NA NA NA
                                             
(1) ANEEL Authorization Resolution No. 7,010 of May 3, 2018, published in Official Gazette (D.O.U.) of 05.09.2018, authorizes the extension of installed capacity from 30,300 kW to 42,800 kW, and extends the concession of HPP Curuá-Una for a period of 20 (twenty) years, in accordance with § 7 of art. 26 of Law No. 9,427 of 1996, as of the publication of this Resolution, subject to the begining of commercial  operation of unit 4 until the expiration date of the current concession.
(2) MME Ordinance 331 dated 08.14.2018 - DOU 08.15.2018, Authorize the total termination of the Thermoelectric Generating Center called UTE Araguaia. Eletronorte, through CE-CRR-0118, dated 06.20.2018, requested ANEEL to revoke the authorization granting for UTE Araguaia. However, the Association of Municipalities of Araguaia - AMA filed Public Civil Action No. 2803-97.2018.811,008 against Eletronorte in the Mato Grosso Court and Justice, having been granted emergency relief. Eletronorte, through CE-CRR-0144, dated 8/7/2018, requested ANEEL to suspend the process. On 10.11.2018, Eletronorte filed a lawsuit before the Federal Court (Case No. 1021506-05.2018.4.01.3400) to discuss the matter, but it is still pending judgment.
By determination of RD-0249/2019 of 08.08.2019, Eletronorte, through CE-CRR-0157/2019 of 08.30.2019, requested SCG/ANEEL to resume the process aiming at the revocation of the authorization grant of UTE Araguaia, in terms of MME Ordinance No. 331 of 08.14.2018. On 11.06.2019, SCG/ANEEL requested Eletronorte to demonstrate that the aforementioned Public Civil Action has no more effects. By means of correspondence s/n dated 11.11.2019, Eletronorte's Legal Counsel presented the requested clarifications. SCG/ANEEL forwarded Memorandum No. 281/2019-SCG/ANEEL to the Federal Attorney with ANEEL. Given that there was no manifestation, Eletronorte reiterated the claim of CE-CRR-0157/2019, through CE-CRR-0079/2020, of 05/26/2020.
(3) HPPs shared, but FURNAS acquires the fraction of the partner through energy purchase contracts - considered Assured Energy and total generation of each HPP.
(4) Aneel was requested to extend the concession under the legal terms and deadline through application REQ.GCO.P.027.2013, dated 07/05/2013. The conditions of the said concession are still in force.

 

3 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

(5) TPP Roberto Silveira (Campos) is out of commercial operation, according to ANNEL Order 708/2019. Installed capacity of 25.00 MW according to ANEEL order 484/2016.
(6)  The amounts reported refer to the Company's participation in the project (Governador Jayme Canet Júnior Consortium - 49% Eletrosul)
(7) TPPs Cristiano Rocha, Manauara, Ponta Negra, Tambaqui and Jaraqui are not part of Amazonas GT's own generation assets, they belong to Independent Energy Producers – PIE, from which Amazonas GT purchases its energy and resells it to Amazonas D through Energy Purchase and Sale Agreements – CCVE. These contracts for the purchase of energy from the IPPs by Amazonas GT upon their termination in May/2025, by contract, the IPP plants will revert to the equity of Amazonas GT (5/05/2025 reversal of the assets of the Tambaqui and Jaraqui UTEs and 05/21/2025 reversal of the assets of the Manauara, Ponta Negra and Cristiano Rocha TPPs), which will operate until November 30, 2030.
(8) CNAAA's plants do not operate under the concession regime. They are operating under the authorization regime. Angra I has an exploration license given by MME Order nº 416 of 07/13/1970 and Angra 2 has an exploration license given by Exp. Mot. MME No. 300 of 05/28/1974.
(9) TPP Candiota III does not have a Concession Grant, but Authorization for Operation, according to MME Ordinance No. 304/2008, of 09/17/2008. The Physical Guarantee value of 262.4 MWavg refers to the gross amount. The project's Net Physical Guarantee is 173.69 MWavg.
(10) ITAIPU Binacional is an entity governed by international public law, created and governed by the Treaty signed between the Federative Republic of Brazil and the Republic of Paraguay on April 26, 1973. The concession for the hydroelectric development, which belongs to the two countries in a condominium, is regulated in Article V of the international treaty mentioned before. Therefore, ITAIPU Binacional does not hold a concession granted by the Federal Government under Brazilian law. Eletrobras holds 50% of the project's total installed capacity.
(11) Decree No. 85,983, of May 6, 1981. FURNAS - Centrais Elétricas SA is granted a concession for the use of the hydraulic energy of the stretch of the main course of the Tocantins River and its tributaries on the right and left banks, in the State of Goiás. 12.11 .2004 - CC 05/2004 - HPP Serra da Mesa
(12) Decree nº 52,394 of 08/22/1963 - authorizes Companhia Hidrelétrica do Vale do Paraíba to set up a thermoelectric plant. Decree nº 60,350 of 03/10/1967 - grants Central Elétrica de Furnas the concession for the use of hydraulic energy, authorization for the establishment of a thermoelectric plant and other measures.
(13) The concession for exploration of PCH Coremas was initially granted to the Departamento Nacional de Obras Contra Secas (National Department of Works Against Drought) - DNOCS through Decree No. 53,417, of 1/20/1964 and later transferred to Companhia Hidro Elétrica do São Francisco - CHESF through Decree No. 74,971 , of 11/26/1974.
(14) Incorporation by Chesf of the Pindaí Complex as of April 2021.
(15) The Senador Arnon Afonso Farias de Mello TPP is transferred to Roraima Energia SA, the successor of Boa Vista Energia SA, through a lending agreement. This project is not being considered in Eletronorte's installed capacity.
(16) The plants were available until early May / 2021, according to the deadline established in Ordinance No. 406/2020, however, they were not dispatched by the ONS in 2Q21, only the internal consumption of fuel oil for GU (generating unit) maintenance is computed.
(17) The wind farms of the Pindaí Complex I, II and III operated in 1Q21 under the regime of participation in SPEs, with percentages: 99.96% (Angical 2, Caititu 2 and 3, Corrupião 3, Carcará and Papagaio), 99, 93% Acauã, 99.90% Ararapá, 99.95% Teiú 2, 99.98% Coqueirinho 2 and 83.01% Little Tamanduá 2.
(18) As of 3Q21, the information on Installed Capacity, Physical Guarantee, Energy Generated and Fuel Consumption in 3Q21 of the Amazonas GT plants were transferred to Eletronorte.
(19) Start of Commercial Operation on December 24, 2020, pursuant to Dispatch No. 3,653, of December 23, 2020. This dispatch authorized the start of commercial operation only of the generating units UG1 to UG9 and UG12 to UG18, totaling 24 MW" . End of operation according to Authorizing Resolution No. 7907, of June 18, 2019. Authorizing Resolution 7907, of 06/18/2019, makes reference to the installed power of the Casa Nova A plant, but makes no reference to the physical guarantee of such power plant. This is due to the fact that the Casa Nova A plant does not have a Physical Guarantee defined by the MME. The amount of 6.8 MW presented comes from the plant certification study, being only a reference.
(20) Review of the Physical Guarantee of WPP Casa Nova II, pursuant to Ordinance No. 360, of September 30, 2020.
(21) Eletronorte incorporated Amazonas GT as of 07/01/2021.
                             
                       
II.1.2.1.2 Losses on Genereation - %
Eletrobras Companies 1Q21 2Q21 3Q21 4Q21            
In the quarter Accumulated In the quarter Accumulated In the quarter Accumulated In the quarter Accumulated            
Eletronorte 0.84 0.84 0.79 0.79 1.13 0.95 0.99 0.98            
Chesf 2.72 2.72 2.91 5.64 2.26 7.89 2.60 10.67            
Furnas 1.13 1.13 0.87 1.00 0.84 0.94 0.96 0.95            
Eletronuclear 6.05 6.05 6.12 6.08 5.65 5.93 5.63 5.84            
CGT Eletrosul 5.23 5.23 7.65 6.41 7.04 6.61 6.79 6.65            
Itaipu Binacional 0.56 0.56 0.53 0.55 0.56 0.55 0.60 0.56            
Amazonas G&T 1.85 1.85 1.70 1.78 (22) (22) (22) (22)            
                             
(22) As of 3Q21, losses from Amazonas GT plants are consolidated in Eletronorte.
                             
II.1.2.1.3 Eletrobras Companies Average Price of Sale and Purchase of Energy
                           
  Eletrobras Companies Average Price without Amazonas GT (R$/MWh)* 1Q21 2Q21 3Q21 4Q21 2021                
  RCE (Regulated Market) 227.16 229.20 246.55 262.78 241.22                
  FCE (Free Market) 163.29 167.43 195.99 196.21 180.90                
  Energy Purchase 206.57 232.83 333.97 240.68 263.66                
                   
  Notes:      
  * RCE and energy purchase prices do not include the prices of Amazonas GT contracts, including PIEs (Independent Producers) contracts, arising from the unbundling process of Amazonas Distribuidora, it is worth noting that, in this case, the energy purchase and sale operations do not reflect an economic impact for Amazonas GT.
  - Sales prices calculated from the total revenue divided by the energy sold.
  - Purchase prices calculated from the total expense divided by the purchased energy.
  - It does not include enterprises not renewed by Law 12,783/13.
  - It includes enterprises affected by Law 13.182/13.
  - It includes Eletronuclear.
  - When buying energy from PIEs (Independent Producers) for resale, by Amazonas-GT (due to the unbundling process at Amazonas Distribuidora), fuel costs are not considered.

 

4 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

                 
  Eletrobras Companies Average Price (R$/MWh) 1Q21 2Q21 3Q21 4Q21 2021    
     
  RCE 302.95 312.41 315.85 354.63 321.46    
  FCE 163.29 167.43 195.99 196.21 180.90    
  Energy Purchase 247.79 267.07 339.20 277.82 288.77    
                 
  Notes:    
  - Sales prices calculated from the total revenue divided by the energy sold.
  - Purchase prices calculated from the total expense divided by the purchased energy.
  - It does not include enterprises not renewed by Law 12,783/13.
  - It includes enterprises affected by Law 13.182/13.
  - It includes Eletronuclear.
  - When buying energy from PIEs (Independent Producers) for resale, by Amazonas-GT (due to the unbundling process at Amazonas Distribuidora), fuel costs are not considered.

 

5 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

                                             
II.1.2.2 Generation Assets and Generated Energy – Enterprises under O&M Regime - renewed by Law 12,783/13
Eletrobras Companies Enterprise   Energy source Beginning of Concession Beginning of Operation End of Operation       Type of Fuel Metric Unit Fuel used for electricity production  
Location Installed Capacity Physical Guarantee Generated Energy (MWh)   1Q21 2Q21 3Q21 4Q21
(State) (MW) (MW Average) 1Q21 2Q21 3Q21 4Q21 Amount R$ Million Amount R$ Million Amount R$ Million Amount R$ Million
Eletronorte UHE Coaracy Nunes AP Hydro Jun-97 Dec-75 Dec-42             78.00                  62.60              148,063              154,299 156,451 135,981 NA NA NA NA NA NA NA NA NA NA
Chesf  Funil BA Hydro Aug-61 Aug-62 Feb-43             27.28                   10.66                 13,941 11,449 10,034 12,112 NA NA NA NA NA NA NA NA NA NA
Pedra BA Hydro Aug-61 Nov-78 Dec-42              18.24                    3.66                  4,845 4,957             4,480.23             14,701.18  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
Complexo de Paulo Afonso BA Hydro Oct-45 Jan-55 Apr-43 3,901.43 2,067.10            1,951,008 2,216,262 2,204,704 2,062,201 NA NA NA NA NA NA NA NA NA NA
Luiz Gonzaga (Itaparica) PE Hydro Oct-45 Jun-88 May-43         1,348.86                890.97              884,500 1,003,364 1,038,153 957,261 NA NA NA NA NA NA NA NA NA NA
Boa Esperança (Castelo Branco) PI Hydro Oct-65 Apr-70 May-43 216.33 132.90               271,126 251,485 226,243 362,613 NA NA NA NA NA NA NA NA NA NA
Xingó SE Hydro Oct-45 Dec-94 May-43 2,882.59 1,997.28           2,203,778 2,509,967 2,537,629 2,367,123 NA NA NA NA NA NA NA NA NA NA
Furnas Furnas MG Hydro Jul-57 Sep-63 Dec-42 1,216.00 582.00 722,427 870,243 875,377 640,704 NA NA NA NA NA NA NA NA NA NA
Luis Carlos Barreto (Estreito)  SP/MG Hydro Jun-62 Mar-69 Dec-42 1,050.00 495.40 633,942 638,266 788,677 544,888 NA NA NA NA NA NA NA NA NA NA
Porto Colômbia (2) MG/SP Hydro Mar/67 and Aug/68 Jun-73 Dec-42 320.00 186.00 318,798 274,098 315,050 259,074 NA NA NA NA NA NA NA NA NA NA
Marimbondo SP/MG Hydro Mar-67 Oct-75 Dec-42 1,440.00 689.70 964,536 647,802 719,480 714,365 NA NA NA NA NA NA NA NA NA NA
Funil (3) RJ Hydro Jun/61 and Mar/67 Mar-70 Dec-42 216.00 115.00 252,134 192,559 199,902 170,929 NA NA NA NA NA NA NA NA NA NA
Jaguari SP Hydro Jan-21 Jan-72 (5) 27.60 13.30 1,954 24,586 31,076 4,304 NA NA NA NA NA NA NA NA NA NA
Corumbá I (4) GO Hydro Oct/81 and Nov/84 Oct-96 Dec-42 375.00 217.40 473,365 356,701 276,416 358,463 NA NA NA NA NA NA NA NA NA NA
Eletronuclear NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
CGT Eletrosul NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Itaipu Binacional NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
Amazonas GT NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

 

 

6 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

                                             
II.1.2.3 Generation Assets and Generated Energy –  Enterprises under Integral Responsibility renewed by Law 12,783/13
Eletrobras Companies Enterprise Location Energy source Beginning of Concession Beginning of Operation End of Operation Installed Capacity Physical Guarantee Generated Energy (MWh) Type of Fuel Metric Unit 1Q21 2Q21 3Q21 4Q21
(State) (MW) (MW Average) 1Q21 2Q21 3Q21 4Q21 Amount R$ Million Amount R$ Million Amount R$ Million Amount R$ Million
Chesf Sobradinho BA Hydro Feb-72 Nov-79 Feb-52         1,050.30                504.50              470,942              683,355 581,645 493,416 NA NA NA NA NA NA NA NA NA NA
Funil  BA Hydro Aug-61 Aug-62 Dec-42               2.72                    0.25                     323                     265 232 281 NA NA NA NA NA NA NA NA NA NA
Pedra BA Hydro Aug-61 Nov-78 Dec-42                1.77                    0.08                      110                      113 102 334 NA NA NA NA NA NA NA NA NA NA
Complexo de Paulo Afonso BA Hydro Oct-45 Jan-55 Dec-42            378.17                  46.70                44,075                50,068 49,807 46,587 NA NA NA NA NA NA NA NA NA NA
Luiz Gonzaga (Itaparica) PE Hydro Oct-45 Jun-88 Dec-42            130.74                   20.13                19,982                22,667 23,453 21,626 NA NA NA NA NA NA NA NA NA NA
Boa Esperança (Castelo Branco) PI Hydro Oct-65 Apr-70 Dec-42             20.97                    3.00                  6,126                  5,683 5,112 8,194 NA NA NA NA NA NA NA NA NA NA
Xingó SE Hydro Oct-45 Dec-94 Dec-42            279.41                   45.12                49,786                56,703 57,328 53,476 NA NA NA NA NA NA NA NA NA NA
Furnas Itumbiara (1) GO/MG Hydro Feb-70 Apr-80 Feb-20 2,082.00 948.90              637,974           1,473,498 756,514 505,453 NA NA NA NA NA NA NA NA NA NA
(1) Law No. 13,182, dated 11.03.2015, allowed FURNAS to extend the concession of the  HPP Itumbiara in exchange for its participation in the Fundo de Energia do Sudeste-Centro-Oeste (Southeast-Central-West Energy Fund) - FESC as well as the signing of energy contracts backed by the plant physical guarantee with consumer units located in the Southeast / Midwest submarket, based on auctions promoted by FURNAS. Therefore, and also because FURNAS 'adherence to the regime provided in the law mentioned above, FURNAS will have the extension of the concession of HPP Itumbiara for an additional period of up to 30 years. It is still under analysis by Aneel.
(2) Decree nº 60.411, of March 11, 1967 - Grants to Companhia Paulista de Força e Luz, concession for the progressive use of hydraulic energy of a stretch of the Rio Grande located between the municipality of Guaíra, State of São Paulo and the municipality of Frutal in Minas Gerais state. Then, decree nº 63.133, of August 20, 1968 - Transfers from Companhia Paulista de Força to Central Elétrica de Furnas SA the concession for the progressive use of hydraulic energy of a stretch of the Rio Grande, between the municipalities of Guaíra (State of São Paulo) and Frutal (State of Minas Gerais).
(3) Decree nº 50,798 of 06/15/1961 - Grants the Companhia Hidreletrica do Vale do Paraíba - CHEVAP, the concession for the use of existing hydraulic energy in a stretch of Paraíba River, between the Salto Region, on the limits of the states of Rio de Janeiro and São Paulo, and the Funil river rapids, located in the district of Itatiaia, municipality of Resende, State of Rio de Janeiro. Decree nº 60.350 of 03/10/1967 - Grants the Central Elétrica de Furnas S.A. the concession for the use of hydraulic energy, authorization for the establishment of thermoelectric plant and other measures.
(4) Decree nº 86,435 of 10/05/1981 - Grants to Centrais Elétricas de Goiás S/A. - CELG concession for the use of the hydraulic energy of a stretch of the Corumbá River, in the State of Goiás. Decree nº 90,583 of 11/29/1984 - Transfers from Centrais Elétricas de Goiás S/A. - CELG for Furnas - Centrais Elétricas S.A. the concession for the use of hydraulic energy, of a stretch of the Corumbá River, in the State of Goiás.
(5) According to ANEEL Ordinance No. 409, November 13, 2020, the provision of the Electricity Generation Service will start on January 1, 2021 and will take place until the concessionaire winning the bid for the Hydroelectric Power Plant takes over.

7 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

                         
RCE Contracts - Quantity
                         
Eletrobras Companies Auction
(if it is a Regulated Bilateral Contract, client should be informed)
Committed Plants Source Beginning Date Ending Date Submarket Current Volume
(MW avg)
Updated Price
(R$/MWh)
Accounting Position
(Supply)
Index    
Amazonas GT CBR - OC 87495/2013 (Amazonas D) Balbina (Own Plant) Hydro Jul-15 Mar-27  N  125.92 332.43 Supply IPCA    
CCVE 004/2018 (Amazonas D) Tambaqui (Resale)(1) Thermal Nov-10 May-25  N  60.00 820.52 Supply IGP-M    
CCVE 003/2018 (Amazonas D) Jaraqui (Resale)(1) Thermal Nov-10 May-25  N  60.00 843.48 Supply IGP-M    
CCVE 002/2018 (Amazonas D) Manauara (Resale)(1) Thermal Nov-10 May-25  N  60.00 737.95 Supply IGP-M    
CCVE 001/2018 (Amazonas D) Ponta Negra (Resale)(1) Thermal Nov-10 May-25  N  60.00 755.01 Supply IGP-M    
CCVE 005/2018 (Amazonas D) Cristiano Rocha (Resale)(1) Thermal Nov-10 May-25  N  65.00 761.83 Supply IGP-M    
CCVE 008/2018 (Amazonas D - Isolated Systems) Caapiranga  (Own Plant) Thermal Dec-18 Nov-30  N  1.19 1343.67 Supply IPCA    
CCVE 006/2018 (Amazonas D - Isolated Systems) Anamã (Own Plant) Thermal Dec-18 Nov-30  N  1.27 1355.71 Supply IPCA    
CCVE 009/2018 (Amazonas D - Isolated Systems) Codajás (Own Plant) Thermal Dec-18 Nov-30  N  3.01 1408.65 Supply IPCA    
CCVE 007/2018 (Amazonas D - Isolated Systems) Anori (Own Plant) Thermal Dec-18 Nov-30  N  2.51 1284.37 Supply IPCA    
CCESI 001/2019 (Amazonas D - Isolated Systems) Coari (Resale)(1) Thermal Jan-20 Nov-30  N  12.00 1105.68 Supply IPCA    
CGT Eletrosul 1st New Energy Auction Passo São João Hydro Jan-10 Dec-39 S 37.00 247.73 Supply IPCA    
3rd New Energy Auction Governador Jayme Canet Júnior Hydro Jan-11 Dec-40 S 94.08 241.72 Supply IPCA    
5th New Energy Auction São Domingos Hydro Jan-12 Dec-41 SE/CO 36.00 259.84 Supply IPCA    
2nd Energy Reserve Auction Cerro Chato I Wind Jul-12 Jun-32 S 10.73 240.84 Supply IPCA    
2nd Energy Reserve Auction Cerro Chato II Wind Jul-12 Jun-32 S 11.09 240.84 Supply IPCA    
2nd Energy Reserve Auction Cerro Chato III Wind Jul-12 Jun-32 S 11.11 240.84 Supply IPCA    
Chesf 5th Energy Reserve Auction Acauã Wind Sep-15 Aug-35  NE  2.60 167.09 Supply IPCA    
5th Energy Reserve Auction Angical 2 Wind Sep-15 Aug-35  NE  4.90 167.09 Supply IPCA    
5th Energy Reserve Auction Arapapá Wind Sep-15 Aug-35  NE  1.90 167.09 Supply IPCA    
5th Energy Reserve Auction Caititu 2 Wind Sep-15 Aug-35  NE  5.10 167.09 Supply IPCA    
5th Energy Reserve Auction Caititu 3 Wind Sep-15 Aug-35  NE  4.70 167.09 Supply IPCA    
5th Energy Reserve Auction Carcará Wind Sep-15 Aug-35  NE  4.60 167.09 Supply IPCA    
5th Energy Reserve Auction Corrupião 3 Wind Sep-15 Aug-35  NE  4.20 167.09 Supply IPCA    
5th Energy Reserve Auction Teiú 2 Wind Sep-15 Aug-35  NE  3.70 167.09 Supply IPCA    
Eletronorte 18th Existing Energy Auction Tucuruí Hydro Jan-21 Dec-22 N 4.41 167.31 Supply No indexation    
Furnas 1st New Energy Auction - MANSO Manso Hydro Jan-08 Dec-37  SE/CO  35.00 222.88 Supply IPCA    
1st New Energy Auction -MANSO Manso Hydro Jan-10 Dec-39  SE/CO  55.00 256.96 Supply IPCA    
1st New Energy Auction - BATALHA Batalha Hydro Jan-10 Dec-39  SE/CO  47.00 261.07 Supply IPCA    
1st New Energy Auction - SIMPLICIO Simplício Hydro Jan-10 Dec-39 SE/CO 185.00 263.76 Supply IPCA    
                         
(1) Contracts for the sale of energy resulting from the unbundling process of Amazonas Distribuidora -> Process: 48500.004245 / 2012-43 -ANEEL. The amounts of energy negotiated come from the purchase of PIEs (Independent Producers).
                         
RCE Contracts - Availability
                         
Eletrobras Companies Auction
(if it is a Regulated Bilateral Contract, client should be informed)
Committed Plants Source Beginning Date Ending Date Submarket Current Volume
(MW avg)
Updated Fixed Revenue
(R$ thousand/year)
Accounting Position
(Supply)
Index    
Amazonas GT 20th New Energy Auction Mauá 3 Thermal Jan-19 Nov-30 N 484.4 1,030,060.39 Supply IPCA    
20th New Energy Auction Aparecida Thermal Jan-19 Nov-30  N  145.00 308,627.45 Supply IPCA    
CGT Eletrosul 17th New Energy Auction Coxilha Seca Wind Jan-16 Dec-35 S 8.3 13,669.83 Supply IPCA    
17th New Energy Auction Capão do Inglês Wind Jan-16 Dec-35  S  2.80 4,623.53 Supply IPCA    
17th New Energy Auction Galpões Wind Jan-16 Dec-35 S 2.1 3,492.85 Supply IPCA    
1st New Energy Auction Candiota (2) Thermal Jan-10 Dec-24  S  227.00 529,969.96 Supply IPCA    
Chesf 18th New Energy Auction Casa Nova II Wind Jan-18 Dec-37 NE 7.1 11,225.33 Supply IPCA    
18th New Energy Auction Casa Nova III Wind Mar-18 Dec-37  NE  5.50 8,693.26 Supply IPCA    
17th New Energy Auction Coqueirinho 2 Wind Sep-19 Dec-35  NE  7.30 11,766.39 Supply IPCA    
17th New Energy Auction Papagaio Wind Oct-19 Dec-35  NE  4.70 7,545.95 Supply IPCA    
18th New Energy Auction Tamanduá Mirim 2 Wind Nov-19 Dec-37  NE  7.20 11,317.41 Supply IPCA    
Eletronuclear Nuclear Energy Quotas Angra I e Angra II Nuclear NA NA SE/CO 1572.7 3,157,337.64 Supply NA    
Furnas 5th New Energy Auction Santa Cruz Nova Thermal Jan-12 Dec-26  SE/CO  245.70 251,873.91 Supply IPCA    
(2) The amount of Fixed Revenue for the year is R$ 532,960,663.21. Added to this are the variable income credits (R$ 52,245,275.44), reimbursement debts for availability of R$ 53,304,580.00 (forecast for 2021) and debts for financial adjustments of the CCEE of R$ 1,931. 388.68.
                         
                         
Eletrobras Companies Plant Installed Capacity 1Q21 2Q21 3Q21 4Q21 2021
(MW)  Inflexibilility average (MWavg) CVU avg
(R$/MWh)
 Inflexibilility average (MWavg) CVU avg
(R$/MWh)
 Inflexibilility average (MWavg) CVU avg
(R$/MWh)
 Inflexibilility average (MWavg) CVU avg
(R$/MWh)
 Inflexibilility average (MWavg) CVU avg
(R$/MWh)
Amazonas GT TPP Mauá 3 590.8 252.0 86.63 228.6 95.05 252.1 118.12 241.34 167.03 243.49 116.71
TPP Aparecida 166.0 65.7 86.63 67.1 95.05 70.6 118.12 69.95 167.03 68.34 116.71
CGT Eletrosul TPP Candiota III 350.0 243.7 87.20 275.2 89.39 211.7 92.44 0.00 93.38 181.70 90.23
Furnas TPP Santa Cruz 350 0 181.70 0.0 196.45 0.0 257.23 0 390.60 0 256.50

 

8 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

             
Furnas Total Furnas Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee Mw avg                               2,298.80                               2,298.80                                2,301.77                               2,298.80
  GAGO&M  R$ million                                     77.21                                    78.07                                     85.13                                     85.13
  GAG Improvements R$ million                                    94.72                                    95.77                                   104.93                                   104.93
  CAIMI (Annual Cost of Fixed and Mobile Facilities) (Annual Cost of Fixed and Mobile Facilities) R$ million                                     12.30                                     12.44                                     13.63                                     13.63
  Unavailability adjustment R$ million                                      11.71                                      11.71                                     10.82                                     10.82
  R&D R$ million                                       3.16                                       3.16                                      3.23                                      3.23
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                    114.91                                    114.91                                    107.51                                    107.51
  CFURH R$ million                                    24.78                                     14.24                                    20.72                                     14.27
  PIS/COFINS R$ million                                     34.31                                    33.67                                    35.26                                     34.61
  TOTAL R$ million                        373.10                        363.97                        381.23                        374.12
             
  Furnas Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee Mw avg                                  582.00                                  582.00                                  582.00                                  582.00
  GAGO&M  R$ million                                     19.33                                     19.55                                      21.41                                      21.41
  GAG Improvements R$ million                                     19.47                                     19.68                                     21.56                                     21.56
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                      3.22                                      3.26                                      3.57                                      3.57
  Unavailability adjustment R$ million                                      8.27                                      8.27                                      3.22                                      3.22
  R&D R$ million                                      0.79                                      0.79                                      0.75                                      0.75
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                    27.38                                    27.38                                    24.82                                    24.82
  CFURH R$ million                                      5.65                                      3.60                                      5.85                                       3.51
  PIS/COFINS R$ million                                      8.57                                       8.41                                      8.28                                      8.04
  TOTAL R$ million                          92.68                          90.94                          89.46                          86.88
             
  Luis Carlos Barreto (Estreito) Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee Mw avg                                  495.40                                  495.40                                  495.40                                  495.40
  GAGO&M  R$ million                                     15.87                                     16.05                                     17.48                                     17.48
  GAG Improvements R$ million                                     22.15                                    22.40                                    24.53                                    24.53
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                      2.78                                       2.81                                      3.08                                      3.08
  Unavailability adjustment R$ million                                      2.54                                      2.54                                      2.95                                      2.95
  R&D R$ million                                      0.73                                      0.73                                      0.74                                      0.74
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                    28.48                                    28.48                                    25.38                                    25.38
  CFURH R$ million                                       5.13                                      2.35                                       5.18                                        3.11
  PIS/COFINS R$ million                                      7.92                                      7.68                                      8.09                                      7.88
  TOTAL R$ million                          85.59                          83.03                          87.42                          85.15
             
  Porto Colômbia Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee  Mw avg                                   186.00                                   186.00                                   186.99                                   186.00
  GAGO&M  R$ million                                      7.05                                       7.12                                      7.75                                      7.75
  GAG Improvements R$ million                                      7.98                                      8.07                                      8.84                                      8.84
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                      0.85                                      0.86                                      0.94                                      0.94
  Unavailability adjustment R$ million -                                     1.03 -                                     1.03 -                                    0.76 -                                    0.76
  R&D R$ million                                       0.21                                       0.21                                      0.24                                      0.24
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                      5.95                                      5.95                                      7.08                                      7.08
  CFURH R$ million                                       2.41                                        1.14                                      2.05                                       1.37
  PIS/COFINS R$ million                                      2.39                                      2.28                                      2.66                                      2.59
  TOTAL R$ million                          25.81                          24.61                          28.80                          28.04
             
  Marimbondo Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee  Mw avg                                  689.70                                  689.70                                  690.69                                  689.70
  GAGO&M  R$ million                                     21.09                                     21.32                                    23.35                                    23.35
  GAG Improvements R$ million                                    30.87                                      31.21                                     34.19                                     34.19
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                       3.81                                      3.86                                      4.23                                      4.23
  Unavailability adjustment R$ million                                       1.53                                       1.53                                      3.87                                      3.87
  R&D R$ million                                       1.00                                       1.00                                       1.04                                       1.04
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                     41.35                                     41.35                                    38.24                                    38.24
  CFURH R$ million                                      6.20                                      3.34                                       4.41                                      3.39
  PIS/COFINS R$ million                                     10.79                                     10.56                                      11.14                                      11.04
  TOTAL R$ million 116.64 114.16 120.47 119.35
             
  Funil Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee  Mw avg                                    115.00                                    115.00                                    115.00                                    115.00
  GAGO&M  R$ million                                       5.13                                       5.19                                       5.61                                       5.61
  GAG Improvements R$ million                                      5.33                                      5.39                                      5.90                                      5.90
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                      0.57                                      0.58                                      0.63                                      0.63
  Unavailability adjustment R$ million                                      0.45                                      0.45                                      0.89                                      0.89
  R&D R$ million                                       0.14                                       0.14                                       0.16                                       0.16
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                      2.20                                      2.20                                       2.71                                       2.71
  CFURH R$ million                                       1.49                                       1.08                                       1.06                                      0.98
  PIS/COFINS R$ million                                       1.56                                       1.53                                       1.73                                       1.72
  TOTAL R$ million 16.86 16.55 18.69 18.60
             
  Corumbá I Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee  Mw avg                                   217.40                                   217.40                                   217.40                                   217.40
  GAGO&M  R$ million                                      7.52                                      7.60                                       8.15                                       8.15
  GAG Improvements R$ million                                      7.99                                      8.08                                      8.85                                      8.85
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                      0.99                                        1.01                                        1.10                                        1.10
  Unavailability adjustment R$ million -                                    0.03 -                                    0.03                                      0.65                                      0.65
  R&D R$ million                                      0.26                                      0.26                                      0.28                                      0.28
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                      9.35                                      9.35                                      9.04                                      9.04
  CFURH R$ million                                       1.67                                      2.66                                       1.99                                       1.85
  PIS/COFINS R$ million                                      2.83                                      2.95                                      3.06                                      3.05
  TOTAL R$ million 30.58 31.87 33.11 32.96
             
  Jaguari Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee  Mw avg                                     13.30                                     13.30                                     14.29 13.30
  GAGO&M  R$ million                                       1.22                                       1.23                                       1.38 1.38
  GAG Improvements R$ million                                      0.93                                      0.94                                       1.06 1.06
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                      0.07                                      0.07                                      0.08 0.08
  Unavailability adjustment R$ million                                          -                                             -                                             -    0.00
  R&D R$ million                                      0.02                                      0.02                                      0.03 0.03
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                      0.20                                      0.20                                      0.24 0.24
  CFURH R$ million                                      2.23                                      0.07                                       0.18 0.06
  PIS/COFINS R$ million                                      0.25                                      0.26                                      0.30 0.29
  TOTAL R$ million 4.93 2.81 3.28 3.14

 

9 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

             
Eletronorte Total Eletronorte Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee  Mw avg                                    62.60                                    62.60                                    62.60                                          -   
  GAGO&M  R$ million                                      2.69                                      2.72                                       2.91                                       2.91
  GAG Improvements R$ million                                      2.54                                      2.57                                       2.81                                       2.81
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                       0.21                                       0.21                                      0.23                                      0.23
  Unavailability adjustment R$ million                                       0.17                                       0.18                                       0.31                                       0.31
  R&D R$ million                                      0.07                                      0.07                                      0.08                                      0.08
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                       1.07                                       1.07                                       1.56                                       1.56
  Amazon Tax Replacement R$ million                                       0.12                                       0.12                                       0.13                                       0.13
  CFURH R$ million                                      0.78                                      0.83                                      0.84                                      0.79
  PIS/COFINS R$ million                                      0.77                                      0.78                                      0.89                                      0.89
  TOTAL R$ million 8.41 8.54 9.77 9.71
             
  Coaracy Nunes Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee  Mw avg                                    62.60                                    62.60                                    62.60                                    63.00
  GAGO&M  R$ million                                      2.69                                      2.72                                       2.91                                       2.91
  GAG Improvements R$ million                                      2.54                                      2.57                                       2.81                                       2.81
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                       0.21                                       0.21                                      0.23                                      0.23
  Unavailability adjustment R$ million                                       0.17                                       0.18                                       0.31                                       0.31
  R&D R$ million                                      0.07                                      0.07                                      0.08                                      0.08
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                       1.07                                       1.07                                       1.56                                       1.56
  Amazon Tax Replacement R$ million                                       0.12                                       0.12                                       0.13                                       0.13
  CFURH R$ million                                      0.78                                      0.83                                      0.84                                      0.79
  PIS/COFINS R$ million                                      0.77                                      0.78                                      0.89                                      0.89
  TOTAL R$ million 8.41 8.54 9.77 9.71
             
             
             
Chesf Total Chesf Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee  Mw avg                                 5,102.91                                 5,102.91                                 5,102.91                                 5,102.91
  GAGO&M  R$ million                                    112.74                                    113.99                                    122.12                                    122.12
  GAG Improvements R$ million                                   182.59                                   184.62                                  202.23                                  202.23
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                    23.86                                     24.12                                    26.42                                    26.42
  Unavailability adjustment R$ million                                      18.41                                      18.41                                    25.70                                    25.70
  R&D R$ million                                      5.56                                      5.56                                      5.92                                      5.92
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                  209.56                                  209.56                                    214.13                                    214.13
  CFURH R$ million                                    43.65                                    32.29                                    28.53                                    39.07
  PIS/COFINS R$ million                                    60.79                                    59.99                                     63.71                                    64.79
  TOTAL R$ million 657.16 648.54 688.77 700.38
             
  Boa Esperança Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee  Mw avg                                   132.90                                   132.90                                   132.90                                   132.90
  GAGO&M  R$ million                                       5.71                                      5.77                                      6.32                                      6.32
  GAG Improvements R$ million                                      5.26                                      5.32                                      5.83                                      5.83
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                       0.61                                      0.62                                      0.68                                      0.68
  Unavailability adjustment R$ million                                       1.36                                       1.36                                      0.90                                      0.90
  R&D R$ million                                       0.19                                       0.19                                       0.19                                       0.19
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                      5.47                                      5.47                                      5.45                                      5.45
  CFURH R$ million                                       1.24                                       1.64                                       1.33                                       1.56
  PIS/COFINS R$ million                                      2.02                                      2.08                                        2.11                                       2.13
  TOTAL R$ million 21.87 22.45 22.81 23.07
             
  Complexo Paulo Afonso Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee  Mw avg                                2,067.10                                2,067.10                                2,067.10                                2,067.10
  GAGO&M  R$ million                                    48.97                                    49.52                                    54.24                                    54.24
  GAG Improvements R$ million                                    99.85                                   100.96                                    110.59                                    110.59
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                      11.09                                      11.21                                     12.28                                     12.28
  Unavailability adjustment R$ million                                      12.51                                      12.51                                      7.72                                      7.72
  R&D R$ million                                      2.74                                      2.74                                      2.88                                      2.88
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                    97.00                                    97.00                                    102.01                                    102.01
  CFURH R$ million                                     16.28                                      11.85                                     10.06                                      13.61
  PIS/COFINS R$ million                                    29.40                                     29.13                                    30.56                                    30.92
  TOTAL R$ million 317.85 314.92 330.33 334.24
             
  Pedra Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee  Mw avg                                      3.66                                      3.66                                      3.66                                      3.66
  GAGO&M  R$ million                                      0.65                                      0.66                                      0.72                                      0.72
  GAG Improvements R$ million                                      0.60                                      0.60                                      0.66                                      0.66
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                      0.05                                      0.05                                      0.06                                      0.06
  Unavailability adjustment R$ million -                                     0.13 -                                     0.13 -                                     0.14 -                                     0.14
  R&D R$ million                                      0.02                                      0.02                                      0.02                                      0.02
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                      0.42                                      0.42                                      0.48                                      0.48
  CFURH R$ million                                      0.06                                      0.03                                      0.03                                      0.02
  PIS/COFINS R$ million                                       0.17                                       0.17                                       0.19                                       0.19
  TOTAL R$ million 1.83 1.82 2.02 2.00
             
  Funil Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee  Mw avg                                      11.00                                      11.00                                      11.00                                      11.00
  GAGO&M  R$ million                                       1.03                                       1.05                                        1.11                                        1.11
  GAG Improvements R$ million                                       1.22                                       1.23                                       1.35                                       1.35
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                      0.08                                      0.08                                      0.09                                      0.09
  Unavailability adjustment R$ million -                                    0.24 -                                    0.24 -                                    0.25 -                                    0.25
  R&D R$ million                                      0.04                                      0.04                                      0.04                                      0.04
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                       1.64                                       1.64                                       1.36                                       1.36
  CFURH R$ million                                       0.10                                      0.07                                      0.08                                      0.07
  PIS/COFINS R$ million                                      0.40                                      0.39                                      0.38                                      0.38
  TOTAL R$ million 4.27 4.26 4.15 4.14

 

10 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

             
  Luiz Gonzaga Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee  Mw avg                                  890.97                                  890.97                                  890.97                                  890.97
  GAGO&M  R$ million                                     21.25                                     21.49                                    22.94                                    22.94
  GAG Improvements R$ million                                    27.42                                    27.72                                    30.37                                    30.37
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                      3.83                                      3.88                                      4.25                                      4.25
  Unavailability adjustment R$ million                                      2.49                                      2.49                                      6.75                                      6.75
  R&D R$ million                                      0.90                                      0.90                                      0.99                                      0.99
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                    33.87                                    33.87                                    34.04                                    34.04
  CFURH R$ million                                      7.53                                      5.32                                      4.67                                      6.40
  PIS/COFINS R$ million                                      9.92                                      9.75                                     10.60                                     10.78
  TOTAL R$ million 107.20 105.41 114.58 116.49
             
  Xingó Unit 1Q21 2Q21 3Q21 4Q21
  Physical Guarantee  Mw avg                                1,997.28                                1,997.28                                1,997.28                                1,997.28
  GAGO&M  R$ million                                      35.11                                     35.51                                    36.79                                    36.79
  GAG Improvements R$ million                                    48.24                                    48.78                                    53.43                                    53.43
  CAIMI (Annual Cost of Fixed and Mobile Facilities) R$ million                                       8.19                                      8.28                                      9.07                                      9.07
  Unavailability adjustment R$ million                                      2.42                                      2.42                                     10.73                                     10.73
  R&D R$ million                                       1.68                                       1.68                                        1.81                                        1.81
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million                                      71.16                                      71.16                                    70.79                                    70.79
  CFURH R$ million                                     18.44                                     13.39                                     12.37                                     17.42
  PIS/COFINS R$ million                                     18.88                                     18.47                                     19.88                                    20.39
  TOTAL R$ million 204.14 199.69 214.88 220.44

 

11 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

               
               
  Energetic balance - December 2021
               
  Energy Balance (MW avg) 2021 2022 2023 2024 2025
 
  Ballast 9,282 9,399 9,324 9,312 8,825
    Own resources 8,099 8,226 8,226 8,226 7,930
    Energy purchase 1,183 1,173 1,097 1,086 895
  Sales 7,281 6,409 6,027 4,853 3,444
    ACL – Bilateral Contracts + MCP performed 5,244 4,253 3,875 2,701 1,519
  ACR – Excluding quotas regime 2,037 2,156 2,152 2,152 1,925
      Sale Average Price  R$/MWh 241.34 228.42 219.85 228.84 228.30
      Purchase Average Price R$/MWh 288.77 249.08 254.82 257.00 247.84
      Sale Average Price  R$/MWh (1) 194.38 188.84 175.34 173.06 179.90
      Purchase Average Price R$/MWh (1) 263.66 230.10 235.84 236.30 236.30
  Balance (Ballast – Sales) 2,001 2,991 3,297 4,460 5,381
  Uncontracted Energy* 22% 32% 35% 48% 61%
               
  * The uncontracted portion includes energy reserved for the company's hedge, strategically defined according to the GSF estimate for the period.
  Contracts entered into until 09/30/2021.
  The consequences of Law 14.182/2021, the decotization process of plants under the Physical Guarantee Quotas regime and the creation of the new state-owned company are not being considered in the balance sheet.
  The installments of Physical Guarantee Quotas and Nuclear Energy Quotas are not included in the balance.
  In the Average Sales Prices, projects under the Physical Guarantee Quotas and Nuclear Energy Quotas regime are not being considered.
  In Own Resources, for the hydroelectric projects, an estimate of GFIS2 was considered, which means, the Physical Guarantee considering the Adjustment Factors in function of the Internal Losses, Losses in the Basic Grid and Availability.
(1) The extension of the concession period for the Mascarenhas de Moraes and Tucuruí HPPs was considered, as established in ANEEL Ratifying Resolution No. 2,932, of September 14, 2021.
(2) The prices of the contracts of Amazonas GT (incorporated by Eletronorte), including the PIEs (Independent Producers) contracts, arising from the deverticalization process of Amazonas Distribuidora, are not considered in the prices of energy purchases, it is worth noting that, in this case, the operations of purchase and sale of energy do not reflect economic impact ("pass-through").
               
               
  Physical Guarantee and Nuclear Energy Quotas (MWavg) 2021 2022 2023 2024 2025
    Hydroelectric Plants Physical Guarantee Quotas  (3) 7,464 7,464 7,451 7,451 7,451
  Nuclear Energy Quotas 1,573 1,573 1,573 1,573 1,573
(3) The concession under provisional administration of the Jaguari HPP was considered, remaining until 2022.
  It only considers existing CCGF, different from previous publications, which considered the end of the contracts of UHE Mascarenhas de Moraes, in Jan/2024, and of UHE Tucuruí, in Aug/2024, and from these dates, these plants were considered under the Quota regime of Physical Guarantee.
   
               
  With the consequences of Law 14,182/2021 and the decotization process of the plants under the Physical Guarantee Quotas regime, the following scenario is presented considering its implementation:
  Scenario Law 14,182/2021 (MWavg) 2021 2022 2023 2024 2025
     Hydroelectric Plants Physical Guarantee Quotas (3) (4) 7,464 7,464 5,961 4,470 2,980
    Decotization (5) 0 0 1,332 2,663 3,995
    New Grants (6) 0 0 5,728 5,728 5,728
(4) Decotization taking place gradually over a period of 5 years from 2023.
(5) Upon decotization, the plants currently under the quota regime will have a new concession under the Independent Energy Producer - PIE regime, occurring gradually over a period of 5 years from 2023. The Physical Guarantee values ​​were defined in the Ordinance GM/MME No. 544/21.
(6) New concession grants are considered as of 2023 for the Sobradinho, Itumbiara, Tucuruí, Curuá-Una and Mascarenhas de Moraes plants, which Physical Guarantee values ​​were defined in Ordinance GM/MME No. 544/21. Regardless of what is observed in item (1).

 

12 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

  II.1.3. Energy Sold 
                     
  II.1.3.1 Energy Sold by enterprises not renewed by laws 12,783/13 and 13,182/15
  Company Buyer 1Q21 2Q21 3Q21 4Q21
  R$ Million MWh R$ Million MWh R$ Million MWh R$ Million MWh
  Eletronorte  Eletrobras System 52.38 235,440 53.78 238,056 57.92 240,672 57.92 240,672
  Others 745.16 5,252,485.20 785.58 5,079,325.91 2277.51 8,080,034.63 2350.12 7,478,273.55
  Chesf Eletrobras System             0.00 0.00
  Others 82.13 372,524.11 74.20 375,725.01 74.49 373,604.25 73.20 357,224.11
  Furnas Eletrobras System             0.00 0.00
  Others 713.09 3,579,105.98 608.85 2,984,504.76 805.97 3,140,817.22 841.48 3,197,244.14
  Eletronuclear Eletrobras System             0.00 0.00
  Others 789.34 3,397,030.23 789.31 3,434,775.01 789.35 3,472,519.80 789.35 3,472,519.80
  CGT Eletrosul Eletrobras System             0.00 0.00
  Others 377.66 1,688,161.13 357.20 1,563,576.36 397.65 1,702,092.49 447.80 1,766,962.01
  Itaipu Binacional Eletrobras System 757.15 15,933,249.54 769.79 10,693,211.83 761.67 10,190,749.65 751.57 13,379,973.00
  Others 138.10 4,229,066.73 100.06 3,490,378.75 107.56 3,603,534.81 135.59 4,476,189.00
  Amazonas GT Eletrobras System             0.00 0.00
  Others 1,094.44 2,193,731.65 1,098.55 1,987,259.56     0.00 0.00
       
  Note: as of 3Q21, Amazonas GT was incorporated into Eletronorte
                     
  II.1.3.2 Energy Sold by enterprises renewed by 12,783/13 Law – O&M regime
  Company Buyer 1Q21 2Q21 3Q21 4Q21
  R$ Million MWh R$ Million MWh R$ Million MWh R$ Million MWh
  Eletronorte Eletrobras System             0 0
  Others 8.41 135,216.00 8.54 136,718.40 9.77 138,220.80 9.71 138,220.80
  Chesf  Eletrobras System             0 0
  Others 657.16 11,021,551 648.54 11,144,012.88 688.77 11,266,474.56 700.38 11,266,474.56
  Furnas  Eletrobras System             0 0
  Others 373.10 4,965,408.00 363.97 5,020,579.20 381.23 5,075,750.40 374.12 5,075,750.40
  Eletronuclear Eletrobras System                
  Others                
  CGT Eletrosul Eletrobras System                
  Others                
  Itaipu Binacional Eletrobras System                
  Others                
  Amazonas GT Eletrobras System                
  Others                
                     
                     
                     
  II.1.3.2 - Energy sold by the entreprises renewed under the terms of Law 13,182/15
  Company Buyer 1Q21 2Q21 3Q21 4Q21
  R$ Million MWh R$ Million MWh R$ Million MWh R$ Million MWh
  Eletronorte Eletrobras System                
  Others                
  Chesf  Eletrobras System                
  Others 136.43 1,011,630 147.09 1,003,149 157.74 953,777.97 149.76 939,352.41
  Furnas  Eletrobras System                
  Others 265.58 1,607,666.40 268.53 1,625,529 271.48 1,643,392.32 271.67 1,643,392.32
  Eletronuclear Eletrobras System                
  Others                
  CGT Eletrosul Eletrobras System                
  Others                
  Itaipu Binacional Eletrobras System                
  Others                
  Amazonas GT Eletrobras System                
  Others                

 

13 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

                   
II.1.4 Energy purchased for Resale
Company Buyer 1Q21 2Q21 3Q21 4Q21
R$ Million MWh R$ Million MWh R$ Million MWh R$ Million MWh
Eletronorte Eletrobras System - - - - - - - -
Others 1.15 6,178 1.17 6,246 262.70 722,754 299.30 724,896
Chesf Eletrobras System - - - - - -   -
Others 53.64 233,629 49.64 216,382 199.02 614,573 120.42 488,825
Furnas Eletrobras System - - - - - - - -
Others 221.26 1,122,108 282.64 1,150,661 809.75 2,142,283 331.79 1,331,029
Eletronuclear Eletrobras System - - - - - - - -
Others - - - - - - - -
CGT Eletrosul Eletrobras System 52.38 235,440 53.78 238,056 57.92 240,672 57.92 240,672
Others 110.82 529,068 109.15 520,558 109.50 521,723 125.89 581,194
Itaipu Binacional Eletrobras System - - - - - - - -
Others - - - - - - - -
Amazonas GT Eletrobras System - - - - - - - -
Others 259.86 694,962 260.63 702,555 - - - -
                   
Note: Gross values. Accounting records net recoverable PIS/COFINS amounts.
Note: It includes only purchase contracts, not considering the negative values ​​of CCEE accounting.
Note: as of 3Q21, Amazonas GT was incorporated into Eletronorte

 

14 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

             
  II.1.5 Average Rate – R$/MWh
             
  II.1.5.1 Enterprises not renewed by law 12,783/13
  Eletrobras Companies 1Q21 2Q21 3Q21 4Q21 2021
  Eletronorte  145.33 157.85 197.39 204.89 177.26
  Chesf (1) 157.90 160.48 174.95 171.96 166.16
  Furnas (1) 188.68 190.32 225.21 229.96 207.74
  Eletronuclear (4) 232.36 229.80 227.31 227.31 229.18
  CGT Eletrosul 223.71 228.45 233.62 253.43 235.64
  Itaipu (2) (3) 22.60 22.60 22.60 22.60 22.60
  Amazonas GT 498.89 552.80 478.97 636.85 539.10
  (1) It includes enterprises affected by Law 13,182/15.
  (2) Amounts in U$/KW. -
  (3) Tariff, defined in ITAIPU as the unit cost of the electricity service, used in the contracted power invoice.
  (4) Tariff defined considering Eletronuclear's Fixed Revenue for the contracted energy.
  - Sales prices calculated from the total revenue divided by the energy sold.
  - Purchase prices calculated from the total expense divided by the purchased energy.
  - It does not include enterprises not renewed by Law 12,783/13.
   
  II.1.5.2 Enterprises renewed by law 12,783/13 – O&M Regime           
  Eletrobras Companies 1Q21 2Q21 3Q21 4Q21 2021
  Eletronorte 62.19 62.46 70.70 70.28 66.44
  Chesf  59.62 58.20 61.13 62.17 60.36
  Furnas  75.14 72.50 75.11 73.71 74.11
  Eletronuclear - -      
  CGT Eletrosul - -      
  Itaipu Binacional - -      
  Amazonas GT - -      
             
  Note: Rates estimated considering Total Revenue in the period under the Physical Guarantee.

 

15 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

                             
Enterprises renewed by 12,783/13 Law
Company Contract Readjustment index Number of associated substations Km - total RBSE RPC AAR Others
 (***)
Total Gross AAR per contract
Cycle 2021/2022
Contract term AAR Reduction Date 50% after 15 years Next readjustment date
MME Order 579/12 (O&M) MME Order 120/16 (Indemnities and O&M) MME Order 579/12 (O&M) MME Order 120/16 (Indemnities and O&M) Beginning Date Ending Date
CHESF  061/2001 IPCA 103           19,041.40                803,514,377.16              1,514,802,651.12             77,380,851.35                           106,639,651.31                   378,583,420.05            2,880,920,950.99 Jan-13 Jan-43 N/A Jul-22
FURNAS  062/2001 IPCA 62          19,790.90               688,554,778.08             1,713,793,460.85           392,594,405.28                           919,817,078.10                     433,193,716.61            4,147,953,438.92 Jan-13 Jan-43 N/A
ELETRONORTE  058/2001 IPCA 47            8,650.20               479,960,247.83               782,738,006.27             24,944,165.98                           18,389,463.05                    258,067,713.88             1,564,099,597.01 Jan-13 Jan-43 N/A
ELETROSUL    057/2001 IPCA 58            8,983.50               338,208,966.76               268,528,216.83             46,923,500.52                           34,666,732.55                     127,663,421.66               815,990,838.32 Jan-13 Jan-43 N/A
Total                56,466.00            2,310,238,369.83 4,279,862,335.07            541,842,923.13                        1,079,512,925.01                  1,197,508,272.20            9,408,964,825.24        
                             
Notes                            
1. Substations can be associated with more than one contract.
2. There are AARs that exceed the effective date of the contract and that there is still no regulation of the form of payment, that is, through indemnity or contract extension. For verification of these AARs, see list of modules attached to Aneel's approval resolution for the current cycle, available on the Eletrobras website.
3. Order MME 579/12 - Defined the initial RAP, referred to in art. 13 of Provisional Measure No. 579, 2012, of the facilities that are part of the electric energy transmission concessions covered by art. 6 of said Provisional Measure, subject to the decision provided for in art. 12.
4. Order MME 120/16 - Determined that the amounts approved by the Agência Nacional de Energia Elétrica (National Electric Energy Agency) - ANEEL related to the assets provided for in art. 15, § 2, of Law No. 12,783, of January 11, 2013, became part of the Regulatory Remuneration Basis for electricity transmission concessionaires and that the cost of capital be added to the respective Annual Allowed Revenue (AAR).
5. (***) Other revenue: RBL, RBNI, RBNIA, RCDM, REQ, RICG, RICGNI, RMEL, RMELP e RPEC.            
                             
Enterprises not renewed by 12,783/13 Law
                             
Company Contract Readjustment index Number of associated substations Km - total Total AAR per Contract
Cycle 2021/2022
Contract term AAR Reduction Date 50% after 15 years Next readjustment date   Total  
Beginning Date Ending Date   Company Regulatory AAR km  
CHESF             007/2005 IGPM      2 208.1 40,321,507.79 4/3/2005 4/3/2035 Dec/22          1-Jul-22   CHESF                   3,372,981,856.90              21,801.35  
            008/2005 IGPM      2 119.8 12,715,595.49 4/3/2005 4/3/2035 Sep/24            FURNAS                   4,478,186,324.48             21,702.00  
            010/2007 IPCA      2 94.5 17,153,612.74 6/14/2007 6/14/2037 Aug/27            ELETRONORTE                   2,124,872,408.28              11,099.02  
            012/2007 IPCA      4 316.0 13,294,445.56 6/14/2007 6/14/2037 Sep/25 and Apr/29   CGT ELETROSUL                      1,315,853,778.66               11,954.16  
            005/2008 IPCA      2 110.2 5,134,287.27 3/17/2008 3/17/2038 N/A                Total          11,291,894,368.32       66,556.53  
            014/2008 IPCA      2 145.0 8,216,573.86 10/16/2008 10/16/2038 N/A                      
            006/2009 IPCA      3 49.0 25,666,157.68 1/28/2009 1/28/2039 N/A                      
            017/2009 IPCA      5 95.6 36,548,069.08 3/8/2009 3/8/2039 N/A                      
            018/2009 IPCA      2 144.8 9,182,409.17 3/8/2009 3/8/2039 N/A                      
            004/2010 IPCA      2 34.3 39,883,033.57 12/7/2010 11/7/2040 N/A                      
            007/2010 IPCA      1 0.0 13,330,858.21 12/7/2010 12/7/2040 N/A                      
            013/2010 IPCA      1 0.0 13,235,631.77 6/10/2010 6/10/2040 N/A                      
            014/2010 IPCA      1 0.0 7,814,796.31 6/10/2010 6/10/2040 N/A                      
            019/2010 IPCA      4 177.2 22,344,975.92 11/23/2010 11/23/2040 N/A                      
            020/2010 IPCA      2 115.0 11,710,495.53 11/23/2010 11/23/2040 N/A                      
            021/2010 IPCA      2 91.3 9,439,614.43 11/23/2010 11/23/2040 N/A                      
            008/2011 IPCA      5 275.2 71,602,796.69 10/13/2011 10/13/2041 N/A                      
            009/2011 IPCA      2 64.1 6,249,399.74 10/13/2011 10/13/2041 N/A                      
            010/2011 IPCA      3 65.4 14,315,414.51 10/13/2011 10/13/2041 N/A                      
            017/2011 IPCA      2 45.6 12,692,312.25 9/12/2011 9/12/2041 N/A                      
            005/2012 IPCA      4 41.6 21,752,760.81 10/5/2012 10/5/2042 N/A                      
            017/2012 IPCA      2 0.0 12,737,741.43 1/6/2012 1/6/2042 N/A                      
            018/2012 IPCA      6 209.6 18,768,867.16 1/6/2012 1/6/2042 N/A                      
            019/2012 IPCA      3 60.3 47,949,548.94 1/6/2012 1/6/2042 N/A                      
FURNAS             034/2001 IGPM      2 664.0 238,993,143.95 9/5/2001 9/5/2031 Mar-21 1-Jul-22          
            006/2005 IGPM      2 90.0 31,019,591.45 4/3/2005 4/3/2035 Jun-21          
            007/2006 IPCA      3 71.0 22,879,948.54 4/27/2006 4/27/2036 Jan/28 and Jan/30          
            003/2009 IPCA      2 180.0 12,490,256.38 1/28/2009 1/28/2039 N/A                      
            006/2010 IPCA      2 94.7 10,066,671.01 12/7/2010 12/7/2040 N/A                      
            014/2011 IPCA      2 50.0 4,542,346.81 9/12/2011 9/12/2041 N/A                      
            016/2012 IPCA      1 0.0 10,240,927.42 10/5/2012 10/5/2042 N/A                      
ELETRONORTE             007/2008 IPCA      3 35.9 11,053,798.31 3/17/2008 3/17/2038 N/A             1-Jul-22          
            001/2009 IPCA      2 95.0 24,903,441.26 1/28/2009 1/28/2039 N/A                      
            002/2009 IPCA      1 0.0 18,915,267.48 1/28/2009 1/28/2039 N/A                      
            010/2009 IPCA      2 44.0 81,387,357.18 2/26/2009 2/26/2039 N/A                      
            012/2009 IPCA      2 0.0 263,341,533.26 2/26/2009 2/26/2039 N/A                      
            021/2009 IPCA      7 985.6 85,334,554.21 11/19/2009 11/19/2039 N/A                      
            022/2009 IPCA      3 486.0 45,963,181.97 11/19/2009 11/19/2039 N/A                      
            009/2010 IPCA      2 59.1 6,598,969.56 12/7/2010 12/7/2040 N/A                      
            004/2011 IPCA      1 0.0 3,478,530.62 6/28/2011 6/28/2041 N/A                      
            012/2011 IPCA      2 0.0 6,898,095.05 9/12/2011 9/12/2041 N/A                      
            013/2011 IPCA      1 0.0 2,192,719.32 9/12/2011 9/12/2041 N/A                      
            014/2012 IPCA      2 29.5 10,705,363.05 7/5/2012 7/5/2042 N/A                      
CGT ELETROSUL               004/2004 IGPM      3 371.9 79094945.8 2/18/2004 2/18/2034 Nov-21 1-Jul-22          
            010/2005 IGPM      4 359.1 218384010.2 4/3/2005 4/3/2035 Apr-23          
            005/2006 IPCA      2 257.4 49870342.1 4/27/2006 4/27/2036 May-24          
            004/2008 IPCA      2 237.4 7052235.0 3/17/2008 3/17/2038 N/A          
            005/2009 IPCA      1 0.0 5924062.7 1/28/2009 1/28/2039 N/A          
            011/2010 IPCA      4 0.0 23794445.8 6/10/2010 6/10/2040 N/A          
            012/2010 IPCA      2 36.5 4164603.9 6/10/2010 6/10/2040 N/A          
            002/2011 IPCA      3 231.3 9534820.3 6/16/2011 6/16/2041 N/A          
            004/2012 IPCA      5 785.0 73008279.4 9/5/2014 9/5/2042 N/A          
            008/2014 IPCA      5 236.2 25125814.0 1/29/2014 1/29/2044 N/A          
              624/2014 IPCA      1 0.0 3909381.1 1/29/2014 1/29/2044 N/A            
Total                  7,862.16            1,882,929,543.08                  
                             
Other contracts (*)
                             
Company Km - total                          
                         
CHESF 286.3                          
FURNAS 761.4                          
ELETRONORTE 713.7                          
ELETROSUL   418.5                          
                             
Notes                            
1. Substations can be associated with more than one contract.
2. There are AARs that exceed the effective date of the contract and that there is still no regulation of the form of payment, that is, through indemnity or contract extension. For verification of these AARs, see list of modules attached to Aneel's approval resolution for the current cycle, available on the Eletrobras website.
3. (*) Transmission lines associated with the connection of power plants, free consumers, etc., without a contract with revenue approved by Resolution REH 2,565/2019
4. (**) Considering Art. 2 of Ordinance 706/2016 "The Provision of the Service will take place until the assumption of a new concessionaire resulting from the bidding process referred to in Article 8 of Law No. 12,783, of 2013, under the terms and conditions defined in the Annex to this Ordinance."
5. (***) AAR value considers part of the cycle with full value (100%) and the rest of the cycle with a 50% reduction.

 

16 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

           
2021 Transmission Losses - (%)
           
Month Total Electrical Loss Rates (%)
Chesf Eletronorte Eletrosul Furnas Eletrobras System
January 0.60% 0.60% 1.04% 0.97% 0.83%
February 0.70% 0.77% 1.12% 1.05% 0.93%
March 0.76% 0.83% 0.91% 0.98% 0.88%
April 0.83% 0.82% 0.93% 0.89% 0.85%
May 0.70% 0.72% 0.83% 0.82% 0.76%
Jun 0.54% 0.49% 0.89% 0.75% 0.67%
July 0.64% 0.52% 0.69% 0.76% 0.67%
August 0.73% 0.59% 0.67% 0.77% 0.71%
September 0.81% 0.72% 0.71% 0.78% 0.77%
October 1.11% 0.76% 0.78% 0.99% 0.96%
November 1.07% 0.68% 0.78% 0.92% 0.90%
December 0.63% 0.58% 0.77% 0.90% 0.74%
2021 Total 0.78% 0.69% 0.85% 0.89% 0.81%

 

17 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

                       
  List of modules                    
                       
Eletrobras Company Construction Module Classification Transmission Function Revenue contract Index Type of Revenue AAR Act Beginning term Ending term Cycle AAR
CGT ELETROSUL ABDON BATISTA EL 500 kV ABDON BATISTA LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBNI REA 5904/2016 7/1/2016 30/06/2043 369,764.04
  ABDON BATISTA EL 500 kV ABDON BATISTA LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBNI REA 5904/2016 7/1/2016 30/06/2043 369,764.04
  ALEGRETE EL 13,8 kV ALEGRETE  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,301.77
  ALEGRETE EL 13,8 kV ALEGRETE  DIST1 DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2045 49,079.50
  ALEGRETE EL 13,8 kV ALEGRETE  DIST2 DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2045 49,079.50
  ALEGRETE EL 13,8 kV ALEGRETE  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,301.77
  ALEGRETE EL 13,8 kV ALEGRETE  DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,301.77
  ALEGRETE EL 13,8 kV ALEGRETE  DIST3 DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2045 49,079.50
  ALEGRETE EL 13,8 kV ALEGRETE  DIST4 DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2045 49,079.50
  ALEGRETE EL 13,8 kV ALEGRETE  DIST4 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,301.77
  ALEGRETE EL 138 kV ALEGRETE LT 138 kV SANTA MARIA 3 /ALEGRETE C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 95,926.20
  ALEGRETE EL 138 kV ALEGRETE LT 138 kV SANTA MARIA 3 /ALEGRETE C-1 RS DIT   057/2001 IPCA RMEL REN 443/2011 16/11/2014 15/11/2037 11,357.33
  ALEGRETE EL 69 kV ALEGRETE LT 69 kV ALEGRETE 2 /ALEGRETE C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  ALEGRETE EL 69 kV ALEGRETE LT 69 kV HARMONIA /ALEGRETE C-1 RS DIT   057/2001 IPCA RMEL REN 643/2014 19/11/2013 18/11/2036 5,649.47
  ALEGRETE EL 69 kV ALEGRETE LT 69 kV HARMONIA /ALEGRETE C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  ALEGRETE EL 69 kV ALEGRETE LT 69 kV HARMONIA /ALEGRETE C-2 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  ALEGRETE EL 69 kV ALEGRETE LT 69 kV HARMONIA /ALEGRETE C-2 RS DIT   057/2001 IPCA RMEL REN 643/2014 19/11/2013 18/11/2036 5,649.47
  ALEGRETE EL 69 kV ALEGRETE LT 69 kV MACAMBARA /ALEGRETE C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  ALEGRETE IB 69 kV MG 138 kV ALEGRETE MG1 RS IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,699.48
  ALEGRETE MC 13,8 kV TR 69/13,8 kV ALEGRETE TF7 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2044 291,375.38
  ALEGRETE MC 13,8 kV TR 69/13,8 kV ALEGRETE TR3 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2044 47,107.26
  ALEGRETE MC 13,8 kV TR 69/13,8 kV ALEGRETE TR3 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,781.98
  ALEGRETE MC 13,8 kV TR 69/13,8 kV ALEGRETE TR4 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,781.98
  ALEGRETE MC 13,8 kV TR 69/13,8 kV ALEGRETE TR4 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2044 47,107.26
  ALEGRETE MC 138 kV TR 138/69 kV ALEGRETE TR5 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,753.23
  ALEGRETE MC 138 kV TR 138/69 kV ALEGRETE TR6 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,753.23
  ALEGRETE MC 69 kV TR 138/69 kV ALEGRETE TR5 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,627.38
  ALEGRETE MC 69 kV TR 138/69 kV ALEGRETE TR6 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,627.38
  ALEGRETE MC 69 kV TR 69/13,8 kV ALEGRETE TF7 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2044 291,930.50
  ALEGRETE MC 69 kV TR 69/13,8 kV ALEGRETE TR3 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,627.38
  ALEGRETE MC 69 kV TR 69/13,8 kV ALEGRETE TR4 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,627.38
  ALEGRETE MG 138 kV ALEGRETE MG1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 313,826.23
  ALEGRETE MG 138 kV ALEGRETE MG1 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2042 90,929.38
  ALEGRETE MG 138 kV ALEGRETE MG1 RS DIT   057/2001 IPCA RCDM REA 5861/2016 31/05/2019 30/05/2036 27,776.33
  ALEGRETE TR 138/69 kV ALEGRETE TR5 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 107,761.92
  ALEGRETE TR 138/69 kV ALEGRETE TR6 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 107,761.92
  ALEGRETE TR 69/13,8 kV ALEGRETE TF7 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2047 427,700.90
  ALEGRETE TR 69/13,8 kV ALEGRETE TR3 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,439.40
  ALEGRETE TR 69/13,8 kV ALEGRETE TR4 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,439.40
  ANASTACIO EL 230 kV ANASTACIO LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  ANASTACIO EL 230 kV ANASTACIO LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 95,477.86
  ANASTACIO EL 230 kV ANASTACIO LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 224,031.44
  ANASTACIO IB 230 kV MG 230 kV ANASTACIO MG1 MS IB1 RB FT MG 230 kV ANASTACIO MG1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  ANASTACIO MC 138 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,276.15
  ANASTACIO MC 138 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 45,001.23
  ANASTACIO MC 138 kV TR 230/138 kV ANASTACIO TR2 MS RBF FT TR 230/138 kV ANASTACIO TR2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,276.15
  ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RMEL REN 643/2014 16/05/2016 15/05/2039 2,341.27
  ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 67,201.71
  ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 157,683.63
  ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR2 MS RBF FT TR 230/138 kV ANASTACIO TR2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR2 MS RBF FT TR 230/138 kV ANASTACIO TR2 MS 057/2001 IPCA RMEL REN 643/2014 16/05/2016 15/05/2039 374.78
  ANASTACIO MG 230 kV ANASTACIO MG1 MS RB FT MG 230 kV ANASTACIO MG1 MS 057/2001 IPCA RBNI REA 5861/2016 19/04/2018 18/04/2035 20,010.69
  ANASTACIO MG 230 kV ANASTACIO MG1 MS RB FT MG 230 kV ANASTACIO MG1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 377,386.80
  ANASTACIO MG 230 kV ANASTACIO MG1 MS RB FT MG 230 kV ANASTACIO MG1 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 201,514.56
  ANASTACIO TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,687.58
  ANASTACIO TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 141,870.13
  ANASTACIO TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 332,887.33
  ANASTACIO TR 230/138 kV ANASTACIO TR2 MS RBF FT TR 230/138 kV ANASTACIO TR2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,687.58
  ARAQUARI (HYOSUNG) EL 138 kV ARAQUARI (HYOSUNG) LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  ARAQUARI (HYOSUNG) EL 138 kV ARAQUARI (HYOSUNG) LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  AREIA EL 230 kV AREIA LT 230 kV AREIA /PONTA G NORTE C-1 PR RB FT LT 230 kV AREIA /PONTA G NORTE C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  AREIA EL 230 kV AREIA LT 230 kV AREIA /PONTA G NORTE C-1 PR RB FT LT 230 kV AREIA /PONTA G NORTE C-1 PR 057/2001 IPCA RMEL REN 643/2014 12/10/2013 12/9/2036 17,831.56
  AREIA EL 230 kV AREIA LT 230 kV AREIA /PONTA G NORTE C-1 PR RB FT LT 230 kV AREIA /PONTA G NORTE C-1 PR 057/2001 IPCA RMEL REN 643/2014 12/3/2015 12/2/2044 2,333.73
  AREIA EL 230 kV AREIA LT 230 kV AREIA /PONTA G NORTE C-1 PR RB FT LT 230 kV AREIA /PONTA G NORTE C-1 PR 057/2001 IPCA RBNI REA 6882/2018 17/02/2021 17/02/2042 246,922.94
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RBNI REA 6882/2018 25/01/2021 25/01/2042 237,556.87
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 6/9/2013 6/8/2036 17,496.90
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 29/12/2014 28/12/2043 2,270.17
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 13/04/2014 4/12/2037 18,057.10
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 9/11/2015 9/10/2044 2,318.17
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RBNI REA 6882/2018 3/5/2021 3/5/2042 237,556.76
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBNI REA 6882/2018 20/01/2021 20/01/2041 211,670.12
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RMEL REN 643/2014 22/10/2014 21/10/2043 1,868.21
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 93,007.13
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBNI REA 5484/2015 18/08/2017 17/08/2047 39,379.87
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BATEIAS C-1 PR RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BATEIAS C-1 PR RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RMEL REN 643/2014 26/04/2015 25/04/2046 1,101.50
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BATEIAS C-1 PR RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-1 PR DIT   057/2001 IPCA RCDM REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-1 PR DIT   057/2001 IPCA RMEL REN 643/2014 29/03/2015 28/03/2047 2,264.49
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-1 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 386,742.58
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 386,742.58
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RMEL REN 643/2014 7/4/2015 7/3/2047 2,280.97
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RCDM REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  AREIA EL 500 kV AREIA LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  AREIA EL 500 kV AREIA LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 29/03/2015 28/03/2046 2,271.52
  AREIA EL 500 kV AREIA LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  AREIA EL 500 kV AREIA LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBNI REA 5484/2015 28/10/2015 27/10/2038 36,313.09
  AREIA EL 500 kV AREIA LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  AREIA EL 500 kV AREIA LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBNI REA 5484/2015 28/10/2015 27/10/2043 63,211.65
  AREIA EL 500 kV AREIA LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RMEL REN 643/2014 9/1/2015 31/08/2046 2,298.87
  AREIA EL 500 kV AREIA LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  AREIA EL 500 kV AREIA LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  AREIA EL 500 kV AREIA LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RMEL REN 643/2014 27/02/2016 26/02/2048 2,321.40
  AREIA EL 500 kV AREIA LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  AREIA EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  AREIA EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 205,347.83
  AREIA EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 481,832.85
  AREIA EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RMEL REN 643/2014 29/12/2014 28/12/2046 1,546.33
  AREIA EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  AREIA IB 230 kV MG 500 kV AREIA MG2 PR IB1 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,853.32
  AREIA IB 230 kV MG 500 kV AREIA MG2 PR IB1 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBNI REA 6882/2018 30/03/2021 30/03/2036 152,001.83

 

18 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  AREIA IB 230 kV MG 500 kV AREIA MG2 PR IB1 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 443/2011 22/10/2014 21/10/2039 2,505.67
  AREIA IB 500 kV MG 500 kV AREIA MG2 PR IB1 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  AREIA IB 500 kV MG 500 kV AREIA MG2 PR IB2 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  AREIA IB 500 kV MG 500 kV AREIA MG2 PR IB3 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  AREIA IB 500 kV MG 500 kV AREIA MG2 PR IB4 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  AREIA IB 500 kV MG 500 kV AREIA MG2 PR IB5 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 63,996.32
  AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 150,162.44
  AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RBNI REA 6882/2018 20/01/2021 20/01/2041 215,130.86
  AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RMEL REN 643/2014 18/05/2014 17/05/2044 11,775.96
  AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RMEL REN 643/2014 18/05/2014 17/05/2044 11,775.96
  AREIA MC 230 kV TR 230/138 kV AREIA TR3 PR RBF FT TR 230/138 kV AREIA TR3 PR 057/2001 IPCA RBNI REA 6882/2018 20/01/2021 20/01/2042 223,395.78
  AREIA MC 230 kV TR 230/138 kV AREIA TR3 PR RBF FT TR 230/138 kV AREIA TR3 PR 057/2001 IPCA RBNI REA 4347/2013 22/03/2015 21/03/2045 36,797.87
  AREIA MC 230 kV TR 230/138 kV AREIA TR3 PR RBF FT TR 230/138 kV AREIA TR3 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  AREIA MC 230 kV TR 230/138 kV AREIA TR3 PR RBF FT TR 230/138 kV AREIA TR3 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 63,996.32
  AREIA MC 230 kV TR 500/230 kV AREIA TR2 PR RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  AREIA MC 230 kV TR 500/230 kV AREIA TR2 PR RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RBNI REA 6882/2018 30/03/2021 30/03/2046 411,536.71
  AREIA MC 500 kV TR 500/230 kV AREIA TR2 PR RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RMEL REN 643/2014 14/12/2014 13/12/2039 2,302.72
  AREIA MC 500 kV TR 500/230 kV AREIA TR2 PR RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBNI REA 6882/2018 30/03/2021 30/03/2046 111,229.44
  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 643/2014 12/8/2013 12/7/2030 19,303.88
  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 643/2014 13/10/2014 10/12/2031 13,771.86
  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 643/2014 14/10/2014 13/10/2031 13,773.70
  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 643/2014 20/10/2014 19/10/2034 2,351.85
  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 643/2014 22/10/2014 21/10/2034 2,352.38
  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,627,778.67
  AREIA TR 500/230 kV AREIA TR2 PR RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  AREIA TR 500/230 kV AREIA TR2 PR RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 845,982.69
  AREIA TR 500/230 kV AREIA TRR1 PR RB FT TR 500/230 kV AREIA TRR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 528,105.26
  ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 98,770.66
  ASSIS EL 230 kV ASSIS LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP RB FT LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  ASSIS EL 230 kV ASSIS LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP RB FT LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 98,770.66
  ASSIS EL 230 kV ASSIS LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP RB FT LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP 057/2001 IPCA RMEL REN 643/2014 4/5/2016 4/4/2045 2,356.97
  ASSIS EL 230 kV ASSIS LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP RB FT LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2043 95,609.76
  ASSIS EL 230 kV ASSIS LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP RB FT LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP 057/2001 IPCA RMEL REN 443/2011 9/1/2016 31/08/2039 19,577.36
  ASSIS IB 230 kV MG 440 kV ASSIS MG1 SP IB1 RB FT MG 440 kV ASSIS MG2 SP 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  ASSIS MC 230 kV TR 440/230 kV ASSIS TR1 SP RB FT TR 440/230 kV ASSIS TR1 SP 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 132,627.80
  ASSIS MC 230 kV TR 440/230 kV ASSIS TR1 SP RB FT TR 440/230 kV ASSIS TR1 SP 057/2001 IPCA RMEL REN 643/2014 20/10/2013 19/10/2036 17,679.43
  ASSIS MG 440 kV ASSIS MG2 SP RB FT MG 440 kV ASSIS MG2 SP 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 311,447.86
  ASSIS TR 440/230 kV ASSIS TR1 SP RB FT TR 440/230 kV ASSIS TR1 SP 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,246,686.92
  ASSIS TR 440/230 kV ASSIS TR1 SP RB FT TR 440/230 kV ASSIS TR1 SP 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 665,697.81
  ASSIS TR 440/230 kV ASSIS TRR1 SP RB FT TR 440/230 kV ASSIS TRR1 SP 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 415,562.31
  ASSIS TR 440/230 kV ASSIS TRR1 SP RB FT TR 440/230 kV ASSIS TRR1 SP 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 221,899.27
  ATLANTIDA 2 EL 230 kV ATLANTIDA 2 LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS RB FT LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  ATLANTIDA 2 EL 230 kV ATLANTIDA 2 LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS RB FT LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  ATLANTIDA 2 EL 69 kV ATLANTIDA 2  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  ATLANTIDA 2 EL 69 kV ATLANTIDA 2  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  ATLANTIDA 2 EL 69 kV ATLANTIDA 2  DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  ATLANTIDA 2 EL 69 kV ATLANTIDA 2  DIST4 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  ATLANTIDA 2 IB 230 kV MG 230 kV ATLANTIDA 2 MG1 RS IB1 RB FT MG 230 kV ATLANTIDA 2 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  ATLANTIDA 2 IB 69 kV MG 230 kV ATLANTIDA 2 MG1 RS IB2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,699.48
  ATLANTIDA 2 MC 230 kV TR 230/69 kV ATLANTIDA 2 TR1 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  ATLANTIDA 2 MC 230 kV TR 230/69 kV ATLANTIDA 2 TR2 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  ATLANTIDA 2 MC 230 kV TR 230/69 kV ATLANTIDA 2 TR3 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  ATLANTIDA 2 MC 69 kV TR 230/69 kV ATLANTIDA 2 TR1 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,336.76
  ATLANTIDA 2 MC 69 kV TR 230/69 kV ATLANTIDA 2 TR2 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,336.76
  ATLANTIDA 2 MC 69 kV TR 230/69 kV ATLANTIDA 2 TR3 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,336.76
  ATLANTIDA 2 MG 230 kV ATLANTIDA 2 MG1 RS RB FT MG 230 kV ATLANTIDA 2 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,639.64
  ATLANTIDA 2 MG 230 kV ATLANTIDA 2 MG1 RS RB FT MG 230 kV ATLANTIDA 2 MG1 RS 057/2001 IPCA RMEL REN 643/2014 10/6/2014 10/5/2031 22,647.42
  ATLANTIDA 2 MG 230 kV ATLANTIDA 2 MG1 RS RB FT MG 230 kV ATLANTIDA 2 MG1 RS 057/2001 IPCA RBNI REA 5861/2016 5/2/2019 5/1/2036 6,321.61
  ATLANTIDA 2 TR 230/69 kV ATLANTIDA 2 TR1 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,952.01
  ATLANTIDA 2 TR 230/69 kV ATLANTIDA 2 TR2 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,952.01
  ATLANTIDA 2 TR 230/69 kV ATLANTIDA 2 TR3 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,952.01
  BIGUACU BC 230 kV 0 Mvar BIGUACU BC1 SC RB FT BC 230 kV 100 Mvar BIGUACU BC1 SC 057/2001 IPCA RBNI REA 6090/2016 28/09/2018 28/09/2038 960,623.83
  BIGUACU EL 138 kV BIGUACU  TIJUC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  BIGUACU EL 138 kV BIGUACU LT 138 kV BIGUACU /B.Q.BOCAIUVA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  BIGUACU EL 138 kV BIGUACU LT 138 kV BIGUACU /FLORIANOPOLIS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  BIGUACU EL 138 kV BIGUACU LT 138 kV BIGUACU /FLORIANOPOLIS C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  BIGUACU EL 138 kV BIGUACU LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  BIGUACU EL 138 kV BIGUACU LT 138 kV BIGUACU /TIJUCAS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  BIGUACU EL 230 kV BIGUACU LT 230 kV BIGUACU /DESTERRO C-1 SC RB FT LT 230 kV BIGUACU /DESTERRO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  BIGUACU EL 230 kV BIGUACU LT 230 kV BIGUACU /GASPAR 2 C-1 SC RB FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  BIGUACU EL 230 kV BIGUACU LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  BIGUACU EL 230 kV BIGUACU LT 230 kV BIGUACU /PALHOCA ESU C-1 SC RB FT LT 230 kV BIGUACU /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  BIGUACU EL 500 kV BIGUACU LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 25/05/2039 2,640,203.83
  BIGUACU EL 500 kV BIGUACU LT 500 kV BIGUACU /BLUMENAU C-1 SC RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 25/05/2039 2,640,203.83
  BIGUACU IB 138 kV MG 230 kV BIGUACU MG1 SC IB2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,975.81
  BIGUACU IB 230 kV MG 230 kV BIGUACU MG1 SC IB1 RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  BIGUACU IB 500 kV MG 500 kV BIGUACU MG1 SC IB1 RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 25/05/2046 2,431,521.65
  BIGUACU IB 500 kV MG 500 kV BIGUACU MG1 SC IB2 RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 25/05/2046 2,431,521.65
  BIGUACU IB 500 kV MG 500 kV BIGUACU MG1 SC IB3 RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 25/05/2046 2,431,521.65
  BIGUACU IB 525 kV MG 500 kV BIGUACU MG1 SC IB4 RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 5239/2015 25/05/2017 25/05/2048 2,094,271.14
  BIGUACU MC 138 kV TR 230/138 kV BIGUACU TF7 SC RBF FT TR 230/138 kV BIGUACU TF7 SC 057/2001 IPCA RBNI REA 2589/2010 11/12/2012 11/11/2042 950,857.24
  BIGUACU MC 138 kV TR 230/138 kV BIGUACU TF8 SC RBF FT TR 230/138 kV BIGUACU TF8 SC 057/2001 IPCA RBNI REA 4618/2014 15/04/2016 14/04/2046 1,038,597.95
  BIGUACU MC 138 kV TR 230/138 kV BIGUACU TR2 SC RBF FT TR 230/138 kV BIGUACU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,461.21
  BIGUACU MC 138 kV TR 230/138 kV BIGUACU TR3 SC RBF FT TR 230/138 kV BIGUACU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,461.21
  BIGUACU MC 230 kV BC 230 kV 0 Mvar BIGUACU BC1 SC RB FT BC 230 kV 100 Mvar BIGUACU BC1 SC 057/2001 IPCA RBNI REA 6090/2016 28/09/2018 28/09/2042 700,214.93
  BIGUACU MC 230 kV TR 230/138 kV BIGUACU TF7 SC RBF FT TR 230/138 kV BIGUACU TF7 SC 057/2001 IPCA RBNI REA 2589/2010 11/12/2012 11/11/2042 901,136.44
  BIGUACU MC 230 kV TR 230/138 kV BIGUACU TF8 SC RBF FT TR 230/138 kV BIGUACU TF8 SC 057/2001 IPCA RBNI REA 4618/2014 15/04/2016 14/04/2046 983,108.71
  BIGUACU MC 230 kV TR 230/138 kV BIGUACU TR2 SC RBF FT TR 230/138 kV BIGUACU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  BIGUACU MC 230 kV TR 230/138 kV BIGUACU TR3 SC RBF FT TR 230/138 kV BIGUACU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  BIGUACU MC 230 kV TR 500/230 kV BIGUACU TR1 SC RB FT TR 500/230 kV BIGUACU TR1 SC 010/2005 IGPM RBNI REA 485/2006 7/5/2008 7/5/2040 913,422.52
  BIGUACU MC 230 kV TR 500/230 kV BIGUACU TR2 SC RB FT TR 500/230 kV BIGUACU TR2 SC 010/2005 IGPM RBNI REA 2383/2010 3/1/2012 3/1/2044 829,677.70
  BIGUACU MC 230 kV TR 500/230 kV BIGUACU TRR1 SC RB FT TR 500/230 kV BIGUACU TRR1 SC 010/2005 IGPM RBNI REA 2383/2010 3/1/2012 3/1/2044 38,675.67
  BIGUACU MC 230 kV TR 525/230 kV BIGUACU TR3 SC RB FT TR 500/230 kV BIGUACU TR3 SC 010/2005 IGPM RBNI REA 4802/2014 19/02/2017 19/02/2041 1,572,715.01
  BIGUACU MC 500 kV RTB 500 kV 150 Mvar BIGUACU RT1 SC RB FT RTB 500 kV 150 Mvar BIGUACU RT1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 25/05/2041 2,330,092.16
  BIGUACU MC 500 kV TR 500/230 kV BIGUACU TR1 SC RB FT TR 500/230 kV BIGUACU TR1 SC 010/2005 IGPM RBNI REA 485/2006 7/5/2008 7/5/2041 2,329,134.96
  BIGUACU MC 500 kV TR 500/230 kV BIGUACU TR2 SC RB FT TR 500/230 kV BIGUACU TR2 SC 010/2005 IGPM RBNI REA 2383/2010 3/1/2012 3/1/2045 2,112,576.07
  BIGUACU MC 500 kV TR 500/230 kV BIGUACU TRR1 SC RB FT TR 500/230 kV BIGUACU TRR1 SC 010/2005 IGPM RBNI REA 2383/2010 3/1/2012 3/1/2045 92,521.07
  BIGUACU MC 525 kV RTB 525 kV 0 Mvar BIGUACU RT2 SC RB FT RTB 500 kV 150 Mvar BIGUACU RT2 SC 010/2005 IGPM RBNI REA 5239/2015 25/05/2017 25/05/2045 1,704,390.51
  BIGUACU MC 525 kV TR 525/230 kV BIGUACU TR3 SC RB FT TR 500/230 kV BIGUACU TR3 SC 010/2005 IGPM RBNI REA 4802/2014 19/02/2017 19/02/2045 2,553,543.85
  BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI REA 6090/2016 28/09/2018 28/09/2049 61,266.18
  BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI REA 5861/2016 10/11/2018 10/10/2035 24,043.60
  BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI REA 4618/2014 15/04/2016 14/04/2044 164,000.45
  BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI REA 4618/2014 15/04/2016 14/04/2044 104,077.72
  BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI REA 2589/2010 11/12/2012 11/11/2040 244,623.13
  BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 475,164.44

 

19 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  BIGUACU MG 500 kV BIGUACU MG1 SC RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 25/05/2044 6,925,131.47
  BIGUACU MG 500 kV BIGUACU MG1 SC RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 25/05/2044 192,013.53
  BIGUACU MG 500 kV BIGUACU MG1 SC RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 4802/2014 19/02/2017 19/02/2049 229,549.67
  BIGUACU MG 500 kV BIGUACU MG1 SC RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 2383/2010 3/1/2012 3/1/2040 76,699.45
  BIGUACU MG 500 kV BIGUACU MG1 SC RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 5239/2015 25/05/2017 25/05/2049 846,265.57
  BIGUACU RTB 500 kV 150 Mvar BIGUACU RT1 SC RB FT RTB 500 kV 150 Mvar BIGUACU RT1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 25/05/2044 4,218,323.43
  BIGUACU RTB 525 kV 0 Mvar BIGUACU RT2 SC RB FT RTB 500 kV 150 Mvar BIGUACU RT2 SC 010/2005 IGPM RBNI REA 5239/2015 25/05/2017 25/05/2052 2,893,026.56
  BIGUACU RTB 525 kV 0 Mvar BIGUACU RTR1 SC RB FT RTB 500 kV 50 Mvar BIGUACU RTR1 SC 010/2005 IGPM RBNI REA 5239/2015 25/05/2017 25/05/2052 964,342.18
  BIGUACU TR 230/138 kV BIGUACU TF7 SC RBF FT TR 230/138 kV BIGUACU TF7 SC 057/2001 IPCA RBNI REA 2589/2010 11/12/2012 11/11/2046 1,385,524.01
  BIGUACU TR 230/138 kV BIGUACU TF8 SC RBF FT TR 230/138 kV BIGUACU TF8 SC 057/2001 IPCA RBNI REA 4618/2014 15/04/2016 14/04/2050 1,496,738.78
  BIGUACU TR 230/138 kV BIGUACU TR2 SC RBF FT TR 230/138 kV BIGUACU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  BIGUACU TR 230/138 kV BIGUACU TR3 SC RBF FT TR 230/138 kV BIGUACU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  BIGUACU TR 500/230 kV BIGUACU TR1 SC RB FT TR 500/230 kV BIGUACU TR1 SC 010/2005 IGPM RBNI REA 485/2006 7/5/2008 7/5/2048 10,553,967.66
  BIGUACU TR 500/230 kV BIGUACU TR2 SC RB FT TR 500/230 kV BIGUACU TR2 SC 010/2005 IGPM RBNI REA 2383/2010 3/1/2012 3/1/2052 9,425,791.02
  BIGUACU TR 500/230 kV BIGUACU TRR1 SC RB FT TR 500/230 kV BIGUACU TRR1 SC 010/2005 IGPM RBNI REA 485/2006 7/5/2008 7/5/2048 3,517,989.22
  BIGUACU TR 525/230 kV BIGUACU TR3 SC RB FT TR 500/230 kV BIGUACU TR3 SC 010/2005 IGPM RBNI REA 4802/2014 19/02/2017 19/02/2052 6,809,161.86
  BLUMENAU BC 230 kV 125 Mvar BLUMENAU BC1 SC RB FT BC 230 kV 125 Mvar BLUMENAU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 217,310.74
  BLUMENAU BC 230 kV 125 Mvar BLUMENAU BC2 SC RB FT BC 230 kV 125 Mvar BLUMENAU BC2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 217,310.74
  BLUMENAU EL 138 kV BLUMENAU LT 138 kV BLUMENAU /GASPAR C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  BLUMENAU EL 138 kV BLUMENAU LT 138 kV BLUMENAU /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  BLUMENAU EL 138 kV BLUMENAU LT 138 kV BLUMENAU DOIS /BLUMENAU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  BLUMENAU EL 138 kV BLUMENAU LT 138 kV BLUMENAU DOIS /BLUMENAU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /ITAJAI C-1 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /ITAJAI C-1 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-1 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2044 346.86
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /ITAJAI C-2 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-2 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2044 346.86
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /ITAJAI C-2 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2019 29/04/2049 16,339.74
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RMEL REN 643/2014 12/1/2014 30/11/2044 2,195.89
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBNI REA 3578/2012 23/08/2014 22/08/2044 36,178.78
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBNI REA 3578/2012 30/08/2014 29/08/2044 36,199.31
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2044 2,167.86
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2019 29/04/2049 16,339.74
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RMEL REN 443/2011 12/1/2014 30/11/2044 2,195.89
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RMEL REN 443/2011 11/9/2016 11/8/2039 19,768.61
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2044 2,167.86
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBNI REA 2837/2011 8/2/2014 8/1/2044 36,117.16
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  BLUMENAU EL 500 kV BLUMENAU LT 500 kV BIGUACU /BLUMENAU C-1 SC RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 3/4/2035 3,208,976.53
  BLUMENAU EL 500 kV BLUMENAU LT 500 kV BIGUACU /BLUMENAU C-1 SC RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RMEL REN 643/2014 25/06/2014 24/06/2045 2,485.85
  BLUMENAU EL 500 kV BLUMENAU LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2045 1,743.66
  BLUMENAU EL 500 kV BLUMENAU LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  BLUMENAU IB 138 kV MG 500 kV BLUMENAU MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 71,499.42
  BLUMENAU IB 230 kV MG 500 kV BLUMENAU MG1 SC IB1 RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,853.32
  BLUMENAU IB 230 kV MG 500 kV BLUMENAU MG1 SC IB2 RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,853.32
  BLUMENAU IB 500 kV MG 500 kV BLUMENAU MG1 SC IB1 RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  BLUMENAU IB 500 kV MG 500 kV BLUMENAU MG1 SC IB2 RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  BLUMENAU IB 500 kV MG 500 kV BLUMENAU MG2 SC IB4 RB FT MG 500 kV BLUMENAU MG2 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 3/4/2035 3,208,976.53
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 92,023.55
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 49,138.14
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 115,298.85
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 92,023.55
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 49,138.14
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 115,298.85
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 92,023.55
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 92,023.55
  BLUMENAU MC 230 kV BC 230 kV 125 Mvar BLUMENAU BC1 SC RB FT BC 230 kV 125 Mvar BLUMENAU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 136,543.04
  BLUMENAU MC 230 kV BC 230 kV 125 Mvar BLUMENAU BC1 SC RB FT BC 230 kV 125 Mvar BLUMENAU BC1 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 6/12/2048 185.56
  BLUMENAU MC 230 kV BC 230 kV 125 Mvar BLUMENAU BC2 SC RB FT BC 230 kV 125 Mvar BLUMENAU BC2 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 6/12/2048 185.56
  BLUMENAU MC 230 kV BC 230 kV 125 Mvar BLUMENAU BC2 SC RB FT BC 230 kV 125 Mvar BLUMENAU BC2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 136,543.04
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 63,996.32
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 150,162.44
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBNI REA 3578/2012 26/07/2014 25/07/2044 36,096.63
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RMEL REN 643/2014 14/08/2013 13/08/2036 17,616.94
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2037 1,642.25
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RMEL REN 643/2014 25/11/2013 24/11/2036 17,804.29
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2037 1,642.25
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBNI REA 3578/2012 8/3/2014 8/2/2044 36,120.10
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 63,996.32
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 150,162.44
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBNI REA 3578/2012 17/08/2014 16/08/2044 36,161.17
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RMEL REN 643/2014 28/03/2016 27/03/2039 2,369.49
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2036 17,811.55
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 6/12/2037 2,219.10
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBNI REA 3578/2012 24/08/2014 23/08/2044 36,181.71
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 63,996.32
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RMEL REN 643/2014 26/08/2014 25/08/2037 18,302.64
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RMEL REN 643/2014 28/09/2014 27/09/2044 11,904.00
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2037 18,031.64
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 63,996.32
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 150,162.44
  BLUMENAU MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RMEL REN 643/2014 22/08/2014 21/08/2037 38,038.43
  BLUMENAU MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RMEL REN 643/2014 13/03/2016 3/12/2051 1,445.81
  BLUMENAU MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 317,792.38
  BLUMENAU MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 169,692.72
  BLUMENAU MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 398,170.87
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 181,238.45
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2042 1,946.91
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RMEL REN 643/2014 27/07/2014 26/07/2037 37,940.11
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RMEL REN 643/2014 14/09/2016 13/09/2046 19,523.13
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RMEL REN 643/2014 23/04/2015 22/04/2038 38,961.13
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RMEL REN 643/2014 14/09/2016 13/09/2046 19,523.13
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2042 1,479.65
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 181,238.45
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 425,262.04
  BLUMENAU MC 525 kV RTB 525 kV 0 Mvar BLUMENAU RT2 SC RB FT RTB 525 kV 150 Mvar BLUMENAU RT2 SC 057/2001 IPCA RBNI REA 7151/2018 6/5/2020 6/5/2048 1,522,036.96
  BLUMENAU MG 500 kV BLUMENAU MG1 SC RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBNI REA 7151/2018 6/5/2020 6/5/2043 79,312.17
  BLUMENAU MG 500 kV BLUMENAU MG1 SC RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,331,144.94
  BLUMENAU MG 500 kV BLUMENAU MG1 SC RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 710,796.16
  BLUMENAU MG 500 kV BLUMENAU MG2 SC RB FT MG 500 kV BLUMENAU MG2 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 3/4/2035 2,328,217.50

 

 

20 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  BLUMENAU RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 633,727.45
  BLUMENAU RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,393.68
  BLUMENAU RTB 500 kV 50 Mvar BLUMENAU RTR1 SC RB FT RTB 500 kV 50 Mvar BLUMENAU RTR1 SC 057/2001 IPCA RBNI REA 7151/2018 6/5/2020 6/5/2053 14,470.64
  BLUMENAU RTB 500 kV 50 Mvar BLUMENAU RTR1 SC RB FT RTB 500 kV 50 Mvar BLUMENAU RTR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 211,242.48
  BLUMENAU RTB 500 kV 50 Mvar BLUMENAU RTR1 SC RB FT RTB 500 kV 50 Mvar BLUMENAU RTR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 112,797.89
  BLUMENAU RTB 525 kV 0 Mvar BLUMENAU RT2 SC RB FT RTB 525 kV 150 Mvar BLUMENAU RT2 SC 057/2001 IPCA RBNI REA 7151/2018 6/5/2020 6/5/2055 2,726,224.72
  BLUMENAU RTL 500 kV 150 Mvar BLUMENAU RT2 SC RB FT LT 500 kV BLUMENAU /C.NOVOS C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 3/4/2035 3,426,398.46
  BLUMENAU TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  BLUMENAU TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,707.60
  BLUMENAU TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 447,480.68
  BLUMENAU TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  BLUMENAU TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,707.60
  BLUMENAU TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 447,480.68
  BLUMENAU TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  BLUMENAU TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,707.60
  BLUMENAU TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 447,480.68
  BLUMENAU TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 372,101.72
  BLUMENAU TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 198,692.47
  BLUMENAU TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 466,216.55
  BLUMENAU TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  BLUMENAU TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 845,982.69
  BLUMENAU TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,985,033.14
  BLUMENAU TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  BLUMENAU TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 845,982.69
  BLUMENAU TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,985,033.14
  C.MOURAO EL 230 kV C.MOURAO LT 230 kV C.MOURAO /APUCARANA C-1 PR RB FT LT 230 kV C.MOURAO /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  C.MOURAO EL 230 kV C.MOURAO LT 230 kV C.MOURAO /MARINGA C-1 PR RB FT LT 230 kV C.MOURAO /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  C.MOURAO EL 230 kV C.MOURAO LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  C.MOURAO EL 230 kV C.MOURAO LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  C.MOURAO IB 230 kV MG 230 kV C.MOURAO MG1 PR IB1 RB FT MG 230 kV C.MOURAO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,853.32
  C.MOURAO MC 230 kV TR 230/138 kV C.MOURAO TR1 PR RBF FT TR 230/138 kV C.MOURAO TR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  C.MOURAO MG 230 kV C.MOURAO MG1 PR RB FT MG 230 kV C.MOURAO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 356,744.94
  C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 74,313.22
  C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 175,092.51
  C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 74,313.22
  C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 175,092.51
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 3/4/2035 3,208,976.53
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RMEL REN 443/2011 13/06/2014 6/12/2045 3,081.79
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBNI REA 5861/2016 31/05/2019 30/05/2034 14,161.08
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 12/5/2014 12/4/2045 1,961.00
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RMEL REN 443/2011 15/05/2016 14/05/2039 40,428.38
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RMEL REN 643/2014 2/1/2015 31/01/2045 51,991.37
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RMEL REN 643/2014 9/2/2014 9/1/2037 38,080.02
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 643/2014 20/07/2014 19/07/2037 37,913.63
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 643/2014 13/04/2014 4/12/2044 58,470.88
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 443/2011 15/11/2015 14/11/2030 18,930.75
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 205,347.83
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 481,832.85
  C.NOVOS EL 525 kV C.NOVOS LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 1,694,245.22
  C.NOVOS EL 525 kV C.NOVOS LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RMEL REN 643/2014 13/06/2014 6/12/2045 323.68
  C.NOVOS EL 525 kV C.NOVOS LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 9,651.45
  C.NOVOS IB 138 kV MG 500 kV C.NOVOS MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 71,499.42
  C.NOVOS IB 230 kV MG 500 kV C.NOVOS MG1 SC IB1 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  C.NOVOS IB 230 kV MG 500 kV C.NOVOS MG1 SC IB1 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBNI REA 5484/2015 29/09/2017 28/09/2050 89,854.70
  C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB1 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB2 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB3 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB4 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB4 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,332.74
  C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB5 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB5 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,332.74
  C.NOVOS MC 138 kV TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 92,023.55
  C.NOVOS MC 138 kV TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 92,023.55
  C.NOVOS MC 138 kV TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 92,023.55
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 67,201.71
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 157,683.63
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBNI REA 5484/2015 29/09/2017 28/09/2050 89,854.70
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 67,201.71
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 157,683.63
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBNI REA 5484/2015 29/09/2017 28/09/2050 89,854.70
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 67,201.71
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 157,683.63
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBNI REA 5484/2015 29/09/2017 28/09/2050 89,854.70
  C.NOVOS MC 230 kV TR 500/230 kV C.NOVOS TR1 SC RB FT TR 500/230 kV C.NOVOS TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  C.NOVOS MC 230 kV TR 500/230 kV C.NOVOS TR2 SC RB FT TR 500/230 kV C.NOVOS TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  C.NOVOS MC 230 kV TR 500/230 kV C.NOVOS TR7 SC RB FT TR 500/230 kV C.NOVOS TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  C.NOVOS MC 500 kV RTB 500 kV 100 Mvar C.NOVOS RT2 SC RB FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 158,046.99
  C.NOVOS MC 500 kV RTB 500 kV 100 Mvar C.NOVOS RT2 SC RB FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC 057/2001 IPCA RMEL REN 643/2014 31/01/2014 30/01/2037 37,270.77
  C.NOVOS MC 500 kV RTL 500 kV 100 Mvar C.NOVOS RT1 SC RB FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 205,632.32
  C.NOVOS MC 500 kV RTL 500 kV 75 Mvar C.NOVOS RT4 SC RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 566,377.81
  C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR1 SC RB FT TR 500/230 kV C.NOVOS TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR2 SC RB FT TR 500/230 kV C.NOVOS TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR2 SC RB FT TR 500/230 kV C.NOVOS TR2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 181,238.45
  C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR2 SC RB FT TR 500/230 kV C.NOVOS TR2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 425,262.04
  C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR7 SC RB FT TR 500/230 kV C.NOVOS TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR7 SC RB FT TR 500/230 kV C.NOVOS TR7 SC 057/2001 IPCA RMEL REN 643/2014 15/09/2014 14/09/2042 184.30
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 643/2014 13/08/2014 8/12/2031 27,319.51
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 6/12/2034 2,316.78
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 6/12/2034 2,316.78
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 6/12/2034 2,316.78
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 6/12/2034 2,316.78
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 443/2011 4/1/2015 31/03/2032 10,295.46
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 443/2011 4/1/2015 31/03/2032 10,295.46
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,605.62
  C.NOVOS RTB 500 kV 100 Mvar C.NOVOS RT2 SC RB FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 552,200.15
  C.NOVOS RTB 500 kV 100 Mvar C.NOVOS RT2 SC RB FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 294,860.26
  C.NOVOS RTB 500 kV 100 Mvar C.NOVOS RT2 SC RB FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 691,866.86
  C.NOVOS RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC RB FT RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 183,999.66

 

21 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  C.NOVOS RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC RB FT RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 98,250.95
  C.NOVOS RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC RB FT RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 230,538.27
  C.NOVOS RTL 500 kV 100 Mvar C.NOVOS RT1 SC RB FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 552,200.15
  C.NOVOS RTL 500 kV 100 Mvar C.NOVOS RT1 SC RB FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 294,860.26
  C.NOVOS RTL 500 kV 100 Mvar C.NOVOS RT1 SC RB FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 691,866.86
  C.NOVOS RTL 500 kV 150 Mvar C.NOVOS RT3 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 3/4/2035 3,426,398.46
  C.NOVOS RTL 500 kV 150 Mvar C.NOVOS RT3 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RMEL REN 643/2014 13/06/2014 6/12/2050 673.75
  C.NOVOS RTL 500 kV 25 Mvar C.NOVOS RTR1 SC RB FT RTL 500 kV 25 Mvar C.NOVOS RTR1 SC 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 483,050.79
  C.NOVOS RTL 500 kV 75 Mvar C.NOVOS RT4 SC RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 1,449,149.88
  C.NOVOS RTL 500 kV 75 Mvar C.NOVOS RT4 SC RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RMEL REN 443/2011 13/06/2014 6/12/2047 301.44
  C.NOVOS TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  C.NOVOS TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,707.60
  C.NOVOS TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 447,480.68
  C.NOVOS TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  C.NOVOS TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,707.60
  C.NOVOS TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 447,480.68
  C.NOVOS TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  C.NOVOS TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,707.60
  C.NOVOS TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 447,480.68
  C.NOVOS TR 500/230 kV C.NOVOS TR1 SC RB FT TR 500/230 kV C.NOVOS TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  C.NOVOS TR 500/230 kV C.NOVOS TR2 SC RB FT TR 500/230 kV C.NOVOS TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  C.NOVOS TR 500/230 kV C.NOVOS TR7 SC RB FT TR 500/230 kV C.NOVOS TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  C.NOVOS TR 500/230 kV C.NOVOS TRR1 SC RB FT TR 500/230 kV C.NOVOS TRR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 528,105.26
  CAMAQUA 3 EL 230 kV CAMAQUA 3 LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS RB FT LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS 004/2012 IPCA RBL CC 004/2012 12/9/2014 5/10/2042 412,633.17
  CAMAQUA 3 EL 230 kV CAMAQUA 3 LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS RB FT LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS 004/2012 IPCA RBL CC 004/2012 12/9/2014 5/10/2042 412,633.17
  CAMAQUA 3 EL 69 kV CAMAQUA 3  DIST1 DIT   004/2012 IPCA RPEC CC 004/2012 12/9/2014 5/10/2042 210,173.04
  CAMAQUA 3 EL 69 kV CAMAQUA 3  DIST2 DIT   004/2012 IPCA RPEC CC 004/2012 12/9/2014 5/10/2042 210,173.04
  CAMAQUA 3 EL 69 kV CAMAQUA 3  DIST3 DIT   004/2012 IPCA RPEC CC 004/2012 12/9/2014 5/10/2042 210,173.04
  CAMAQUA 3 IB 230 kV MG 230 kV CAMAQUA 3 MG1 RS IB1 RB FT MG 230 kV CAMAQUA 3 MG1 RS 004/2012 IPCA RBL CC 004/2012 12/9/2014 5/10/2042 254,573.05
  CAMAQUA 3 IB 69 kV MG 230 kV CAMAQUA 3 MG1 RS IB1 DIT   004/2012 IPCA RPEC CC 004/2012 12/9/2014 5/10/2042 121,651.18
  CAMAQUA 3 MC 230 kV TR 230/69 kV CAMAQUA 3 TR1 RS RBF FT TR 230/69 kV CAMAQUA 3 TR1 RS 004/2012 IPCA RBL CC 004/2012 12/9/2014 5/10/2042 292,986.53
  CAMAQUA 3 MC 230 kV TR 230/69 kV CAMAQUA 3 TR2 RS RBF FT TR 230/69 kV CAMAQUA 3 TR2 RS 004/2012 IPCA RBL CC 004/2012 12/9/2014 5/10/2042 292,986.53
  CAMAQUA 3 MC 69 kV TR 230/69 kV CAMAQUA 3 TR1 RS RBF FT TR 230/69 kV CAMAQUA 3 TR1 RS 004/2012 IPCA RBL CC 004/2012 12/9/2014 5/10/2042 119,439.09
  CAMAQUA 3 MC 69 kV TR 230/69 kV CAMAQUA 3 TR2 RS RBF FT TR 230/69 kV CAMAQUA 3 TR2 RS 004/2012 IPCA RBL CC 004/2012 12/9/2014 5/10/2042 119,439.09
  CAMAQUA 3 MG 230 kV CAMAQUA 3 MG1 RS RB FT MG 230 kV CAMAQUA 3 MG1 RS 004/2012 IPCA RBL CC 004/2012 12/9/2014 5/10/2042 658,405.33
  CAMAQUA 3 TR 230/69 kV CAMAQUA 3 TR1 RS RBF FT TR 230/69 kV CAMAQUA 3 TR1 RS 004/2012 IPCA RBL CC 004/2012 12/9/2014 5/10/2042 690,090.57
  CAMAQUA 3 TR 230/69 kV CAMAQUA 3 TR2 RS RBF FT TR 230/69 kV CAMAQUA 3 TR2 RS 004/2012 IPCA RBL CC 004/2012 12/9/2014 5/10/2042 690,090.57
  CAMPO GRANDE BC 138 kV 30 MVAr CAMPO GRANDE BC1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 117,573.11
  CAMPO GRANDE EL 138 kV CAMPO GRANDE  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 145,684.87
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV A.GUARIROBA /CAMPO GRANDE C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 145,684.87
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 145,684.87
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-1 MS DIT   057/2001 IPCA RMEL REN 643/2014 12/9/2013 12/8/2036 11,027.08
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-2 MS DIT   057/2001 IPCA RMEL REN 643/2014 12/9/2013 12/8/2036 11,027.08
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 145,684.87
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /SIDROLANDIA C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 145,684.87
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /SIDROLANDIA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 78,455.76
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /SIDROLANDIA C-1 MS DIT   057/2001 IPCA RMEL REN 643/2014 12/9/2013 12/8/2036 11,027.08
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 145,684.87
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 145,684.87
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RMEL REN 643/2014 12/9/2013 12/8/2036 11,027.08
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RMEL REN 643/2014 29/08/2013 28/08/2036 10,912.33
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 145,684.87
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 145,684.87
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RMEL REN 643/2014 29/08/2013 28/08/2036 10,912.33
  CAMPO GRANDE IB 138 kV MG 138 kV CAMPO GRANDE MG1 MS IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,975.81
  CAMPO GRANDE MC 138 kV BC 138 kV 30 MVAr CAMPO GRANDE BC1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 96,069.77
  CAMPO GRANDE MC 138 kV BC 138 kV 30 MVAr CAMPO GRANDE BC1 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 51,736.51
  CAMPO GRANDE MC 138 kV BC 138 kV 30 MVAr CAMPO GRANDE BC1 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 121,898.57
  CAMPO GRANDE MG 138 kV CAMPO GRANDE MG1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 299,544.03
  CAMPO GRANDE MG 138 kV CAMPO GRANDE MG1 MS DIT   057/2001 IPCA RMEL REN 643/2014 14/02/2013 13/02/2030 19,199.51
  CANOINHAS ESU BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC RB FT BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC 057/2001 IPCA RBNI REA 4802/2014 22/08/2016 21/08/2039 338,565.13
  CANOINHAS ESU EL 230 kV CANOINHAS ESU LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR RB FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  CANOINHAS ESU EL 230 kV CANOINHAS ESU LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR RB FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 93,007.13
  CANOINHAS ESU IB 230 kV MG 230 kV CANOINHAS ESU MG1 SC IB1 RB FT MG 230 kV CANOINHAS ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,853.32
  CANOINHAS ESU IB 230 kV MG 230 kV CANOINHAS ESU MG1 SC IB1 RB FT MG 230 kV CANOINHAS ESU MG1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 50,649.16
  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,276.15
  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 45,001.23
  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 105,591.92
  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR2 SC RBF FT TR 230/138 kV CANOINHAS ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,276.15
  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBNI REA 4892/2014 12/3/2017 12/2/2045 130,763.54
  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,276.15
  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 45,001.23
  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 105,591.92
  CANOINHAS ESU MC 230 kV BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC RB FT BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC 057/2001 IPCA RBNI REA 4802/2014 22/08/2016 21/08/2046 921,347.44
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 63,996.32
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 150,162.44
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR2 SC RBF FT TR 230/138 kV CANOINHAS ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR2 SC RBF FT TR 230/138 kV CANOINHAS ESU TR2 SC 057/2001 IPCA RMEL REN 643/2014 23/11/2015 22/11/2045 2,167.52
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RMEL REN 643/2014 22/11/2015 21/11/2045 2,167.35
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBNI REA 4892/2014 12/3/2017 12/2/2044 114,922.36
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 63,996.32
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 150,162.44
  CANOINHAS ESU MG 230 kV CANOINHAS ESU MG1 SC RB FT MG 230 kV CANOINHAS ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,232.59
  CANOINHAS ESU MG 230 kV CANOINHAS ESU MG1 SC RB FT MG 230 kV CANOINHAS ESU MG1 SC 057/2001 IPCA RBNI REA 4802/2014 22/08/2016 21/08/2044 165,476.52
  CANOINHAS ESU MG 230 kV CANOINHAS ESU MG1 SC RB FT MG 230 kV CANOINHAS ESU MG1 SC 057/2001 IPCA RBNI REA 6630/2017 8/7/2017 8/6/2045 41,745.03
  CANOINHAS ESU TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  CANOINHAS ESU TR 230/138 kV CANOINHAS ESU TR2 SC RBF FT TR 230/138 kV CANOINHAS ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  CANOINHAS ESU TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBNI REA 4892/2014 12/3/2017 12/2/2051 1,654,180.47
  CASCAVEL OEST EL 500 kV CASCAVEL OEST LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034 4,508,248.61
  CAXIAS EL 230 kV CAXIAS LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  CAXIAS EL 230 kV CAXIAS LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RMEL REN 643/2014 1/11/2016 1/10/2045 136.40
  CAXIAS EL 525 kV CAXIAS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  CAXIAS EL 525 kV CAXIAS LT 500 kV CAXIAS /ITA C-1 RS/SC RB FT LT 500 kV CAXIAS /ITA C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  CAXIAS EL 525 kV CAXIAS LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  CAXIAS EL 525 kV CAXIAS LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBNI REA 8314/2019 6/12/2019 6/11/2034 96,905.01
  CAXIAS IB 230 kV MG 525 kV CAXIAS MG1 RS IB1 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  CAXIAS IB 525 kV MG 525 kV CAXIAS MG1 RS IB1 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  CAXIAS IB 525 kV MG 525 kV CAXIAS MG1 RS IB2 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  CAXIAS IB 525 kV MG 525 kV CAXIAS MG1 RS IB3 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  CAXIAS IB 525 kV MG 525 kV CAXIAS MG1 RS IB4 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  CAXIAS MC 230 kV TR 525/230 kV CAXIAS TR1 RS RB FT TR 525/230 kV CAXIAS TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  CAXIAS MC 230 kV TR 525/230 kV CAXIAS TR2 RS RB FT TR 525/230 kV CAXIAS TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  CAXIAS MC 230 kV TR 525/230 kV CAXIAS TR3 RS RB FT TR 525/230 kV CAXIAS TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  CAXIAS MC 525 kV RTB 525 kV 150 Mvar CAXIAS RT1 RS RB FT RTB 525 kV 150 Mvar CAXIAS RT1 RS 057/2001 IPCA RMEL REN 643/2014 25/01/2016 24/01/2049 305.11
  CAXIAS MC 525 kV RTB 525 kV 150 Mvar CAXIAS RT1 RS RB FT RTB 525 kV 150 Mvar CAXIAS RT1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 317,792.38
  CAXIAS MC 525 kV TR 525/230 kV CAXIAS TR1 RS RB FT TR 525/230 kV CAXIAS TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  CAXIAS MC 525 kV TR 525/230 kV CAXIAS TR2 RS RB FT TR 525/230 kV CAXIAS TR2 RS 057/2001 IPCA RMEL REN 643/2014 25/11/2015 24/11/2038 40,810.43
  CAXIAS MC 525 kV TR 525/230 kV CAXIAS TR2 RS RB FT TR 525/230 kV CAXIAS TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67

 

22 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  CAXIAS MC 525 kV TR 525/230 kV CAXIAS TR3 RS RB FT TR 525/230 kV CAXIAS TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  CAXIAS MC 525 kV TR 525/230 kV CAXIAS TR3 RS RB FT TR 525/230 kV CAXIAS TR3 RS 057/2001 IPCA RMEL REN 643/2014 4/9/2016 4/8/2049 213.01
  CAXIAS MG 525 kV CAXIAS MG1 RS RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,424,515.54
  CAXIAS MG 525 kV CAXIAS MG1 RS RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBNI REA 5861/2016 6/3/2019 6/2/2036 18,871.53
  CAXIAS RTB 525 kV 150 Mvar CAXIAS RT1 RS RB FT RTB 525 kV 150 Mvar CAXIAS RT1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 633,727.45
  CAXIAS RTB 525 kV 50 Mvar CAXIAS RTR1 RS RB FT RTB 525 kV 50 Mvar CAXIAS RTR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 211,242.48
  CAXIAS TR 525/230 kV CAXIAS TR1 RS RB FT TR 525/230 kV CAXIAS TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  CAXIAS TR 525/230 kV CAXIAS TR1 RS RB FT TR 525/230 kV CAXIAS TR1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 845,982.69
  CAXIAS TR 525/230 kV CAXIAS TR1 RS RB FT TR 525/230 kV CAXIAS TR1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,985,033.14
  CAXIAS TR 525/230 kV CAXIAS TR2 RS RB FT TR 525/230 kV CAXIAS TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  CAXIAS TR 525/230 kV CAXIAS TR3 RS RB FT TR 525/230 kV CAXIAS TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  CAXIAS TR 525/230 kV CAXIAS TRR1 RS RB FT TR 525/230 kV CAXIAS TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 528,105.26
  CAXIAS SUL 5 BC 13,8 kV 3,6 MVAr CAXIAS SUL 5 BC1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,492.58
  CAXIAS SUL 5 BC 13,8 kV 3,6 MVAr CAXIAS SUL 5 BC2 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,492.58
  CAXIAS SUL 5 BC 13,8 kV 3,6 MVAr CAXIAS SUL 5 BC3 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,492.58
  CAXIAS SUL 5 BC 13,8 kV 3,6 MVAr CAXIAS SUL 5 BC4 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,492.58
  CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5  DIST10 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,301.77
  CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5  DIST4 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,301.77
  CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5  DIST5 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,301.77
  CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5  DIST6 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,301.77
  CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5  DIST7 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,301.77
  CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5  DIST8 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,301.77
  CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5  DIST9 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,301.77
  CAXIAS SUL 5 EL 230 kV CAXIAS SUL 5 LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  CAXIAS SUL 5 EL 230 kV CAXIAS SUL 5 LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  CAXIAS SUL 5 EL 230 kV CAXIAS SUL 5 LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  CAXIAS SUL 5 EL 69 kV CAXIAS SUL 5  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  CAXIAS SUL 5 EL 69 kV CAXIAS SUL 5  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  CAXIAS SUL 5 EL 69 kV CAXIAS SUL 5  DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  CAXIAS SUL 5 IB 13,8 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 25,278.17
  CAXIAS SUL 5 IB 13,8 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB4 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 25,278.17
  CAXIAS SUL 5 IB 230 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB1 RB FT MG 230 kV CAXIAS SUL 5 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  CAXIAS SUL 5 IB 69 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,699.48
  CAXIAS SUL 5 MC 13,8 kV TR 230/13,8 kV CAXIAS SUL 5 TR2 RS RBF FT TR 230/13,8 kV CAXIAS SUL 5 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 39,695.33
  CAXIAS SUL 5 MC 230 kV TR 230/13,8 kV CAXIAS SUL 5 TR2 RS RBF FT TR 230/13,8 kV CAXIAS SUL 5 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  CAXIAS SUL 5 MC 230 kV TR 230/69 kV CAXIAS SUL 5 TR3 RS RBF FT TR 230/69 kV CAXIAS SUL 5 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  CAXIAS SUL 5 MC 69 kV TR 230/69 kV CAXIAS SUL 5 TR3 RS RBF FT TR 230/69 kV CAXIAS SUL 5 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,336.76
  CAXIAS SUL 5 MG 230 kV CAXIAS SUL 5 MG1 RS RB FT MG 230 kV CAXIAS SUL 5 MG1 RS 057/2001 IPCA RBNI REA 5861/2016 15/05/2019 14/05/2036 28,570.26
  CAXIAS SUL 5 MG 230 kV CAXIAS SUL 5 MG1 RS RB FT MG 230 kV CAXIAS SUL 5 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 451,441.48
  CAXIAS SUL 5 TR 230/13,8 kV CAXIAS SUL 5 TR2 RS RBF FT TR 230/13,8 kV CAXIAS SUL 5 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 202,421.37
  CAXIAS SUL 5 TR 230/69 kV CAXIAS SUL 5 TR3 RS RBF FT TR 230/69 kV CAXIAS SUL 5 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 511,196.41
  CAXIAS SUL 5 TR 230/69 kV CAXIAS SUL 5 TRR1 RS RBF FT TR 230/69 kV CAXIAS SUL 5 TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,398.80
  CAXIAS SUL 6 EL 69 kV CAXIAS SUL 6  DIST1 DIT   011/2010 IPCA RPEC CC 011/2010 10/6/2010 10/6/2040 118,407.47
  CAXIAS SUL 6 EL 69 kV CAXIAS SUL 6  DIST2 DIT   011/2010 IPCA RPEC CC 011/2010 10/6/2010 10/6/2040 118,407.47
  CAXIAS SUL 6 IB 230 kV MG 230 kV CAXIAS SUL 6 MG1 RS IB1 RB FT MG 230 kV CAXIAS SUL 6 MG1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 10/6/2040 241,742.85
  CAXIAS SUL 6 IB 69 kV MG 230 kV CAXIAS SUL 6 MG1 RS IB1 DIT   011/2010 IPCA RPEC CC 011/2010 10/6/2010 10/6/2040 67,670.38
  CAXIAS SUL 6 MC 230 kV TR 230/69 kV CAXIAS SUL 6 TR1 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TR1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 10/6/2040 327,474.09
  CAXIAS SUL 6 MC 230 kV TR 230/69 kV CAXIAS SUL 6 TR2 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TR2 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 10/6/2040 327,474.09
  CAXIAS SUL 6 MC 69 kV TR 230/69 kV CAXIAS SUL 6 TR1 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TR1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 10/6/2040 130,237.49
  CAXIAS SUL 6 MC 69 kV TR 230/69 kV CAXIAS SUL 6 TR2 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TR2 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 10/6/2040 130,237.49
  CAXIAS SUL 6 MG 230 kV CAXIAS SUL 6 MG1 RS RB FT MG 230 kV CAXIAS SUL 6 MG1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 10/6/2040 1,002,620.68
  CAXIAS SUL 6 TR 230/69 kV CAXIAS SUL 6 TR1 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TR1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 10/6/2040 1,284,420.37
  CAXIAS SUL 6 TR 230/69 kV CAXIAS SUL 6 TR2 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TR2 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 10/6/2040 1,284,420.37
  CAXIAS SUL 6 TR 230/69 kV CAXIAS SUL 6 TRR1 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TRR1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 10/6/2040 428,140.12
  CHARQUEADAS EL 230 kV CHARQUEADAS LT 230 kV C.INDUSTRIAL /CHARQUEADAS C-1 RS RB FT LT 230 kV C.INDUSTRIAL /CHARQUEADAS C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  CHARQUEADAS EL 230 kV CHARQUEADAS LT 230 kV C.INDUSTRIAL /CHARQUEADAS C-1 RS RB FT LT 230 kV C.INDUSTRIAL /CHARQUEADAS C-1 RS 057/2001 IPCA RMEL REN 443/2011 16/03/2013 15/03/2036 17,342.31
  CHARQUEADAS EL 230 kV CHARQUEADAS LT 230 kV CHARQUEADAS /SANTA CRUZ 1 C-1 RS RB FT LT 230 kV CHARQUEADAS /SANTA CRUZ 1 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  CHARQUEADAS EL 230 kV CHARQUEADAS LT 230 kV SCHARLAU /CHARQUEADAS C-1 RS RB FT LT 230 kV SCHARLAU /CHARQUEADAS C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RMEL REN 643/2014 12/10/2015 12/9/2045 14,040.02
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-2 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-2 RS DIT   057/2001 IPCA RMEL REN 643/2014 12/10/2015 12/9/2045 7,020.00
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-2 RS DIT   057/2001 IPCA RMEL REN 643/2014 28/07/2014 27/07/2044 13,491.77
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RMEL REN 643/2014 26/11/2015 25/11/2045 7,012.33
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 32,503.64
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 76,583.20
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV GUAIBA /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV GUAIBA /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RMEL REN 643/2014 28/07/2014 27/07/2044 20,237.65
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV GUAIBA /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RMEL REN 643/2014 10/11/2014 10/10/2047 37,972.55
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV SAO JERONIMO /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV TAQUARI /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV TRIUNFO /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV TRIUNFO /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 32,503.64
  CHARQUEADAS IB 230 kV MG 230 kV CHARQUEADAS MG1 RS IB1 RB FT MG 230 kV CHARQUEADAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  CHARQUEADAS IB 69 kV MG 230 kV CHARQUEADAS MG1 RS IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,699.48
  CHARQUEADAS IB 69 kV MG 230 kV CHARQUEADAS MG1 RS IB2 DIT   057/2001 IPCA RMEL REN 643/2014 28/07/2014 27/07/2044 6,745.88
  CHARQUEADAS IB 69 kV MG 230 kV CHARQUEADAS MG1 RS IB2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,699.48
  CHARQUEADAS MC 230 kV TR 230/69 kV CHARQUEADAS TR5 RS RBF FT TR 230/69 kV CHARQUEADAS TR5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 112,300.83
  CHARQUEADAS MC 230 kV TR 230/69 kV CHARQUEADAS TR5 RS RBF FT TR 230/69 kV CHARQUEADAS TR5 RS 057/2001 IPCA RMEL REN 643/2014 18/12/2013 17/12/2036 17,846.12
  CHARQUEADAS MC 69 kV TR 230/69 kV CHARQUEADAS TR5 RS RBF FT TR 230/69 kV CHARQUEADAS TR5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,336.76
  CHARQUEADAS MG 230 kV CHARQUEADAS MG1 RS RB FT MG 230 kV CHARQUEADAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 448,498.83
  CHARQUEADAS MG 230 kV CHARQUEADAS MG1 RS RB FT MG 230 kV CHARQUEADAS MG1 RS 057/2001 IPCA RMEL REN 643/2014 30/05/2014 29/05/2031 10,100.21
  CHARQUEADAS MG 230 kV CHARQUEADAS MG1 RS RB FT MG 230 kV CHARQUEADAS MG1 RS 057/2001 IPCA RMEL REN 643/2014 11/6/2014 11/5/2031 10,319.86
  CHARQUEADAS MG 230 kV CHARQUEADAS MG1 RS RB FT MG 230 kV CHARQUEADAS MG1 RS 057/2001 IPCA RMEL REN 643/2014 9/12/2014 9/11/2031 10,244.35
  CHARQUEADAS TR 230/69 kV CHARQUEADAS TR5 RS RBF FT TR 230/69 kV CHARQUEADAS TR5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 273,284.64
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBNI REA 4347/2013 30/11/2015 29/11/2048 85,731.60
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2019 29/04/2049 16,339.74
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBNI REA 4347/2013 30/11/2015 29/11/2048 85,731.60
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2019 29/04/2049 16,339.74
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 93,007.13
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBNI REA 4347/2013 30/11/2015 29/11/2048 85,731.60
  CURITIBA EL 500 kV CURITIBA LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RMEL REN 643/2014 4/4/2015 4/3/2046 2,272.57
  CURITIBA EL 500 kV CURITIBA LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  CURITIBA EL 500 kV CURITIBA LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBNI REA 5484/2015 28/10/2015 27/10/2043 49,844.24
  CURITIBA EL 500 kV CURITIBA LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RMEL REN 643/2014 5/9/2015 5/8/2046 2,278.71
  CURITIBA EL 500 kV CURITIBA LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  CURITIBA EL 500 kV CURITIBA LT 500 kV CURITIBA /BATEIAS C-1 PR RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  CURITIBA EL 500 kV CURITIBA LT 500 kV CURITIBA /BATEIAS C-1 PR RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RMEL REN 643/2014 21/09/2014 20/09/2045 2,238.37
  CURITIBA IB 230 kV MG 500 kV CURITIBA MG1 PR IB1 RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,853.32
  CURITIBA IB 230 kV MG 500 kV CURITIBA MG1 PR IB1 RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBNI REA 4347/2013 30/11/2015 29/11/2048 85,731.60
  CURITIBA IB 500 kV MG 500 kV CURITIBA MG1 PR IB1 RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  CURITIBA IB 500 kV MG 500 kV CURITIBA MG1 PR IB2 RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  CURITIBA IB 500 kV MG 500 kV CURITIBA MG1 PR IB3 RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,649.28
  CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RBNI REA 8314/2019 11/11/2020 11/10/2053 162,542.95
  CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RMEL REN 643/2014 10/12/2013 10/11/2036 17,724.25

 

23 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RMEL REN 643/2014 11/10/2013 11/9/2036 17,776.99
  CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RBNI REA 8314/2019 27/11/2020 26/11/2053 162,652.19
  CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,649.28
  CURITIBA MC 500 kV RTB 500 kV 150 Mvar CURITIBA RT1 PR RB FT RTB 500 kV 150 Mvar CURITIBA RT1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 317,792.38
  CURITIBA MC 500 kV RTL 500 kV 150 Mvar CURITIBA RT2 PR RB FT RTL 500 kV 150 Mvar CURITIBA RT2 PR 057/2001 IPCA RMEL REN 643/2014 17/12/2013 16/12/2036 37,100.60
  CURITIBA MC 500 kV RTL 500 kV 150 Mvar CURITIBA RT2 PR RB FT RTL 500 kV 150 Mvar CURITIBA RT2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 205,632.32
  CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RMEL REN 643/2014 22/08/2013 21/08/2036 36,658.15
  CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RMEL REN 643/2014 6/10/2014 6/9/2047 2,209.76
  CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RMEL REN 643/2014 9/1/2013 31/08/2036 36,695.98
  CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RMEL REN 643/2014 19/06/2014 18/06/2047 2,211.25
  CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RMEL REN 443/2011 14/11/2015 13/11/2032 10,600.44
  CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RMEL REN 443/2011 14/11/2015 13/11/2032 10,600.44
  CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RMEL REN 643/2014 12/1/2013 30/11/2028 711,090.81
  CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RMEL REN 643/2014 3/6/2016 3/5/2036 2,488.59
  CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RMEL REN 643/2014 13/03/2016 3/12/2036 2,490.49
  CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBNI REA 5861/2016 24/08/2018 23/08/2033 8,441.29
  CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,359,064.11
  CURITIBA RTB 500 kV 150 Mvar CURITIBA RT1 PR RB FT RTB 500 kV 150 Mvar CURITIBA RT1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 633,727.45
  CURITIBA RTB 500 kV 150 Mvar CURITIBA RT1 PR RB FT RTB 500 kV 150 Mvar CURITIBA RT1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,393.68
  CURITIBA RTB 500 kV 50 Mvar CURITIBA RTR2 PR RB FT RTB 500 kV 50 Mvar CURITIBA RTR2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 211,242.48
  CURITIBA RTB 500 kV 50 Mvar CURITIBA RTR2 PR RB FT RTB 500 kV 50 Mvar CURITIBA RTR2 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 112,797.89
  CURITIBA RTB 500 kV 50 Mvar CURITIBA RTR2 PR RB FT RTB 500 kV 50 Mvar CURITIBA RTR2 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 264,671.56
  CURITIBA RTL 500 kV 150 Mvar CURITIBA RT2 PR RB FT RTL 500 kV 150 Mvar CURITIBA RT2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 633,727.45
  CURITIBA RTL 500 kV 150 Mvar CURITIBA RT2 PR RB FT RTL 500 kV 150 Mvar CURITIBA RT2 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,393.68
  CURITIBA RTL 500 kV 150 Mvar CURITIBA RT2 PR RB FT RTL 500 kV 150 Mvar CURITIBA RT2 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 794,014.68
  CURITIBA TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  CURITIBA TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 845,982.69
  CURITIBA TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RMEL REN 443/2011 25/10/2015 24/10/2043 41,755.31
  CURITIBA TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RMEL REN 443/2011 7/2/2015 7/1/2045 17,539.93
  CURITIBA TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RMEL REN 443/2011 26/09/2015 25/09/2043 41,667.24
  CURITIBA TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  CURITIBA TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 845,982.69
  CURITIBA TR 500/230 kV CURITIBA TRR1 PR RB FT TR 500/230 kV CURITIBA TRR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 528,105.26
  CURITIBA TR 500/230 kV CURITIBA TRR1 PR RB FT TR 500/230 kV CURITIBA TRR1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 281,994.23
  D.SANTA CRUZ EL 138 kV D.SANTA CRUZ LT 138 kV DOURADOS /D.SANTA CRUZ C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  DESTERRO EL 138 kV DESTERRO  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  DESTERRO EL 138 kV DESTERRO  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  DESTERRO EL 230 kV DESTERRO LT 230 kV BIGUACU /DESTERRO C-1 SC RB FT LT 230 kV BIGUACU /DESTERRO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  DESTERRO IB 138 kV MG 230 kV DESTERRO MG1 SC IB2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,975.81
  DESTERRO IB 230 kV MG 230 kV DESTERRO MG1 SC IB1 RB FT MG 230 kV DESTERRO MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  DESTERRO MC 138 kV TR 230/138 kV DESTERRO ATF2 SC RBF FT TR 230/138 kV DESTERRO ATF2 SC 057/2001 IPCA RBNI REA 4802/2014 29/07/2016 28/07/2046 781,018.82
  DESTERRO MC 138 kV TR 230/138 kV DESTERRO TR1 SC RBF FT TR 230/138 kV DESTERRO TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,461.21
  DESTERRO MC 230 kV RTB 230 kV 0 Mvar DESTERRO RB2 SC RB FT RTB 230 kV 50 Mvar DESTERRO RB2 SC 057/2001 IPCA RBNI REA 7529/2018 23/12/2020 23/12/2043 661,314.77
  DESTERRO MC 230 kV RTB 230 kV 50 Mvar DESTERRO RB1 SC RB FT RTB 230 kV 50 Mvar DESTERRO RB1 SC 057/2001 IPCA RBNI REA 7529/2018 23/12/2020 23/12/2043 661,314.77
  DESTERRO MC 230 kV TR 230/138 kV DESTERRO ATF2 SC RBF FT TR 230/138 kV DESTERRO ATF2 SC 057/2001 IPCA RBNI REA 4802/2014 29/07/2016 28/07/2046 967,739.13
  DESTERRO MC 230 kV TR 230/138 kV DESTERRO TR1 SC RBF FT TR 230/138 kV DESTERRO TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  DESTERRO MG 230 kV DESTERRO MG1 SC RB FT MG 230 kV DESTERRO MG1 SC 057/2001 IPCA RBNI REA 7529/2018 23/12/2020 23/12/2051 175,351.37
  DESTERRO MG 230 kV DESTERRO MG1 SC RB FT MG 230 kV DESTERRO MG1 SC 057/2001 IPCA RBNI REA 4802/2014 29/07/2016 28/07/2044 165,201.90
  DESTERRO MG 230 kV DESTERRO MG1 SC RB FT MG 230 kV DESTERRO MG1 SC 057/2001 IPCA RBNI REA 4802/2014 29/07/2016 28/07/2044 104,846.51
  DESTERRO MG 230 kV DESTERRO MG1 SC RB FT MG 230 kV DESTERRO MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 379,781.30
  DESTERRO RTB 230 kV 0 Mvar DESTERRO RB1 SC RB FT RTB 230 kV 50 Mvar DESTERRO RB1 SC 057/2001 IPCA RBNI REA 7529/2018 23/12/2020 23/12/2055 866,766.46
  DESTERRO RTB 230 kV 0 Mvar DESTERRO RB2 SC RB FT RTB 230 kV 50 Mvar DESTERRO RB2 SC 057/2001 IPCA RBNI REA 7529/2018 23/12/2020 23/12/2055 866,766.46
  DESTERRO TR 230/138 kV DESTERRO ATF2 SC RBF FT TR 230/138 kV DESTERRO ATF2 SC 057/2001 IPCA RBNI REA 4802/2014 29/07/2016 28/07/2050 1,506,080.81
  DESTERRO TR 230/138 kV DESTERRO TR1 SC RBF FT TR 230/138 kV DESTERRO TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  DOURADOS BC 230 kV 0 Mvar DOURADOS BC1 MS RB FT BC 230 kV 50 Mvar DOURADOS BC1 MS 057/2001 IPCA RBNI REA 5744/2016 5/2/2018 5/2/2038 702,095.32
  DOURADOS BC 230 kV 0 Mvar DOURADOS BC2 MS RB FT BC 230 kV 50 Mvar DOURADOS BC2 MS 057/2001 IPCA RBNI REA 5744/2016 5/2/2018 5/2/2038 702,095.32
  DOURADOS EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  DOURADOS EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 95,477.86
  DOURADOS EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 224,031.44
  DOURADOS EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBNI REA 5744/2016 5/2/2018 5/2/2033 24,403.25
  DOURADOS EL 230 kV DOURADOS LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RMEL REN 643/2014 18/08/2012 17/08/2041 1,526.75
  DOURADOS EL 230 kV DOURADOS LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  DOURADOS EL 230 kV DOURADOS LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 95,477.86
  DOURADOS IB 230 kV MG 230 kV DOURADOS MG1 MS IB1 RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  DOURADOS IB 230 kV MG 230 kV DOURADOS MG1 MS IB1 RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RBNI REA 5744/2016 5/2/2018 5/2/2039 112,315.12
  DOURADOS MC 138 kV TR 230/138 kV DOURADOS TR2 MS RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,276.15
  DOURADOS MC 138 kV TR 230/138 kV DOURADOS TR3 MS RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,276.15
  DOURADOS MC 138 kV TR 230/138 kV DOURADOS TR4 MS RBF FT TR 230/138 kV DOURADOS TR4 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,276.15
  DOURADOS MC 138 kV TR 230/138 kV DOURADOS TR5 MS RBF FT TR 230/138 kV DOURADOS TR5 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,276.15
  DOURADOS MC 230 kV BC 230 kV 0 Mvar DOURADOS BC1 MS RB FT BC 230 kV 50 Mvar DOURADOS BC1 MS 057/2001 IPCA RBNI REA 5744/2016 5/2/2018 5/2/2041 607,360.21
  DOURADOS MC 230 kV BC 230 kV 0 Mvar DOURADOS BC2 MS RB FT BC 230 kV 50 Mvar DOURADOS BC2 MS 057/2001 IPCA RBNI REA 5744/2016 5/2/2018 5/2/2041 607,360.21
  DOURADOS MC 230 kV RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 121,024.04
  DOURADOS MC 230 kV RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBNI REA 5744/2016 5/2/2018 5/2/2033 24,403.25
  DOURADOS MC 230 kV RTL 230 kV 27 Mvar DOURADOS RT2 MS RB FT RTL 230 kV 27 Mvar DOURADOS RT2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,220.56
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR2 MS RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR2 MS RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RMEL REN 643/2014 19/08/2012 18/08/2035 461.91
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR3 MS RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR4 MS RBF FT TR 230/138 kV DOURADOS TR4 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR4 MS RBF FT TR 230/138 kV DOURADOS TR4 MS 057/2001 IPCA RBNI REA 5744/2016 5/2/2018 5/2/2033 24,403.25
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR5 MS RBF FT TR 230/138 kV DOURADOS TR5 MS 057/2001 IPCA RBNI REA 5744/2016 5/2/2018 5/2/2033 24,403.25
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR5 MS RBF FT TR 230/138 kV DOURADOS TR5 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  DOURADOS MG 230 kV DOURADOS MG1 MS RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 470,375.45
  DOURADOS MG 230 kV DOURADOS MG1 MS RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RBNI REA 5744/2016 5/2/2018 5/2/2050 103,827.44
  DOURADOS MG 230 kV DOURADOS MG1 MS RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RBNI REA 5744/2016 5/2/2018 5/2/2042 52,740.17
  DOURADOS MG 230 kV DOURADOS MG1 MS RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RMEL REN 643/2014 22/03/2013 21/03/2030 9,549.23
  DOURADOS MG 230 kV DOURADOS MG1 MS RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RMEL REN 643/2014 17/10/2013 16/10/2030 9,837.50
  DOURADOS RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 185,806.33
  DOURADOS RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 99,215.66
  DOURADOS RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 232,801.89
  DOURADOS RTL 230 kV 27 Mvar DOURADOS RT2 MS RB FT RTL 230 kV 27 Mvar DOURADOS RT2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 280,609.67
  DOURADOS RTL 230 kV 27 Mvar DOURADOS RT2 MS RB FT RTL 230 kV 27 Mvar DOURADOS RT2 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 149,838.14
  DOURADOS RTL 230 kV 27 Mvar DOURADOS RT2 MS RB FT RTL 230 kV 27 Mvar DOURADOS RT2 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 351,583.63
  DOURADOS TR 230/138 kV DOURADOS TR2 MS RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,687.58
  DOURADOS TR 230/138 kV DOURADOS TR2 MS RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 141,870.13
  DOURADOS TR 230/138 kV DOURADOS TR2 MS RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 332,887.33
  DOURADOS TR 230/138 kV DOURADOS TR3 MS RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,687.58
  DOURADOS TR 230/138 kV DOURADOS TR3 MS RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 141,870.13
  DOURADOS TR 230/138 kV DOURADOS TR3 MS RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 332,887.33
  DOURADOS TR 230/138 kV DOURADOS TR4 MS RBF FT TR 230/138 kV DOURADOS TR4 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,687.58
  DOURADOS TR 230/138 kV DOURADOS TR5 MS RBF FT TR 230/138 kV DOURADOS TR5 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,687.58
  DOURADOS TR 230/138 kV DOURADOS TR5 MS RBF FT TR 230/138 kV DOURADOS TR5 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 141,870.13
  DOURADOS TR 230/138 kV DOURADOS TRR1 MS RBF FT TR 230/138 kV DOURADOS TRR1 MS 057/2001 IPCA RBNI REA 5969/2016 8/7/2017 8/6/2044 121,722.24
  DOURADOS TR 230/138 kV DOURADOS TRR1 MS RBF FT TR 230/138 kV DOURADOS TRR1 MS 057/2001 IPCA RBNI REA 5969/2016 8/7/2017 31/12/2042 680,989.59
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV CAXIAS /FARROUPILHA C-1 RS RB FT LT 230 kV CAXIAS /FARROUPILHA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV CAXIAS /FARROUPILHA C-2 RS RB FT LT 230 kV CAXIAS /FARROUPILHA C-2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV CAXIAS /FARROUPILHA C-2 RS RB FT LT 230 kV CAXIAS /FARROUPILHA C-2 RS 057/2001 IPCA RMEL REN 643/2014 2/2/2014 2/1/2037 17,929.79
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV CAXIAS SUL 2 /FARROUPILHA C-1 RS RB FT LT 230 kV CAXIAS SUL 2 /FARROUPILHA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95

 

 

24 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RBNI REA 5484/2015 25/09/2017 24/09/2047 39,491.37
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RBNI REA 5484/2015 28/09/2017 27/09/2050 98,511.70
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS 057/2001 IPCA RBNI REA 5484/2015 25/09/2017 24/09/2047 39,491.37
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS 057/2001 IPCA RBNI REA 5484/2015 28/09/2017 27/09/2050 89,848.53
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /SCHARLAU C-1 RS RB FT LT 230 kV FARROUPILHA /SCHARLAU C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS RB FT LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS RB FT LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS 057/2001 IPCA RBNI REA 5484/2015 25/09/2017 24/09/2047 39,491.37
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS RB FT LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS 057/2001 IPCA RMEL REN 643/2014 20/10/2013 19/10/2036 17,738.81
  FARROUPILHA EL 69 kV FARROUPILHA LT 69 kV FARROUPILHA 1 /FARROUPILHA C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 57,069.80
  FARROUPILHA EL 69 kV FARROUPILHA LT 69 kV FARROUPILHA 1 /FARROUPILHA C-2 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 57,069.80
  FARROUPILHA IB 230 kV MG 230 kV FARROUPILHA MG1 RS IB1 RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  FARROUPILHA MC 230 kV TR 230/69 kV FARROUPILHA TR1 RS RBF FT TR 230/69 kV FARROUPILHA TR1 RS 057/2001 IPCA RBNI REA 5484/2015 28/09/2017 27/09/2050 89,848.53
  FARROUPILHA MC 230 kV TR 230/69 kV FARROUPILHA TR2 RS RBF FT TR 230/69 kV FARROUPILHA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 132,627.80
  FARROUPILHA MC 230 kV TR 230/69 kV FARROUPILHA TR3 RS RBF FT TR 230/69 kV FARROUPILHA TR3 RS 057/2001 IPCA RBNI REA 6688/2017 7/3/2020 7/3/2044 652,561.13
  FARROUPILHA MC 69 kV TR 230/69 kV FARROUPILHA TR1 RS RBF FT TR 230/69 kV FARROUPILHA TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 45,984.56
  FARROUPILHA MC 69 kV TR 230/69 kV FARROUPILHA TR2 RS RBF FT TR 230/69 kV FARROUPILHA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 45,984.56
  FARROUPILHA MC 69 kV TR 230/69 kV FARROUPILHA TR3 RS RBF FT TR 230/69 kV FARROUPILHA TR3 RS 057/2001 IPCA RBNI REA 6688/2017 7/3/2020 7/3/2042 1,096,646.49
  FARROUPILHA MG 230 kV FARROUPILHA MG1 RS RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBNI REA 5861/2016 20/12/2018 19/12/2033 8,532.34
  FARROUPILHA MG 230 kV FARROUPILHA MG1 RS RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBNI REA 6688/2017 28/06/2020 28/06/2050 6,876.61
  FARROUPILHA MG 230 kV FARROUPILHA MG1 RS RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBNI REA 6688/2017 28/06/2020 28/06/2050 3,393.19
  FARROUPILHA MG 230 kV FARROUPILHA MG1 RS RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBNI REA 6688/2017 28/06/2020 28/06/2050 131,812.84
  FARROUPILHA MG 230 kV FARROUPILHA MG1 RS RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 463,151.33
  FARROUPILHA TR 230/69 kV FARROUPILHA TR1 RS RBF FT TR 230/69 kV FARROUPILHA TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 273,284.64
  FARROUPILHA TR 230/69 kV FARROUPILHA TR1 RS RBF FT TR 230/69 kV FARROUPILHA TR1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 145,926.76
  FARROUPILHA TR 230/69 kV FARROUPILHA TR1 RS RBF FT TR 230/69 kV FARROUPILHA TR1 RS 057/2001 IPCA RMEL REN 643/2014 18/10/2015 17/10/2048 2,291.32
  FARROUPILHA TR 230/69 kV FARROUPILHA TR2 RS RBF FT TR 230/69 kV FARROUPILHA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 273,284.64
  FARROUPILHA TR 230/69 kV FARROUPILHA TR2 RS RBF FT TR 230/69 kV FARROUPILHA TR2 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 145,926.76
  FARROUPILHA TR 230/69 kV FARROUPILHA TR3 RS RBF FT TR 230/69 kV FARROUPILHA TR3 RS 057/2001 IPCA RBNI REA 6688/2017 7/3/2020 7/3/2054 1,168,870.80
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV BIGUACU /FLORIANOPOLIS C-1 SC DIT   057/2001 IPCA RMEL REN 443/2011 27/04/2014 26/04/2037 11,130.08
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV BIGUACU /FLORIANOPOLIS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV BIGUACU /FLORIANOPOLIS C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV BIGUACU /FLORIANOPOLIS C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 74,417.37
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV BIGUACU /FLORIANOPOLIS C-2 SC DIT   057/2001 IPCA RMEL REN 443/2011 27/04/2014 26/04/2037 11,130.08
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RCDM REA 3578/2012 19/04/2018 18/04/2048 20,083.56
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RMEL REN 443/2011 26/04/2014 25/04/2037 11,128.95
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RCDM REA 3578/2012 19/04/2018 18/04/2048 20,083.56
  FLORIANOPOLIS EL 69 kV FLORIANOPOLIS  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 57,069.80
  FLORIANOPOLIS EL 69 kV FLORIANOPOLIS  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 57,069.80
  FLORIANOPOLIS EL 69 kV FLORIANOPOLIS  DIST2 DIT   057/2001 IPCA RMEL REN 443/2011 29/04/2014 28/04/2037 5,742.46
  FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,252.15
  FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR1 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048 25,525.51
  FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,252.15
  FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR2 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048 25,525.51
  FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR3 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,252.15
  FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR3 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048 25,525.51
  FLORIANOPOLIS MC 69 kV TR 138/69 kV FLORIANOPOLIS TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,244.87
  FLORIANOPOLIS MC 69 kV TR 138/69 kV FLORIANOPOLIS TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,244.87
  FLORIANOPOLIS MC 69 kV TR 138/69 kV FLORIANOPOLIS TR3 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,244.87
  FLORIANOPOLIS MG 138 kV FLORIANOPOLIS MG1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 297,476.16
  FLORIANOPOLIS TR 138/69 kV FLORIANOPOLIS TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 107,761.92
  FLORIANOPOLIS TR 138/69 kV FLORIANOPOLIS TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 107,761.92
  FLORIANOPOLIS TR 138/69 kV FLORIANOPOLIS TR3 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 107,761.92
  FLORIANOPOLIS TR 138/69 kV FLORIANOPOLIS TR3 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,033.10
  FORQUILHINHA EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS RB FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  FORQUILHINHA EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS RB FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS 057/2001 IPCA RMEL REN 643/2014 27/07/2014 26/07/2043 23.99
  FORQUILHINHA EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RMEL REN 643/2014 19/10/2014 18/10/2043 24.15
  FORQUILHINHA EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 5861/2016 29/04/2019 28/04/2036 9,897.90
  FORQUILHINHA EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  FOZ DO CHAPECO EL 138 kV FOZ DO CHAPECO  CHAPECO 2 DIT   002/2011 IPCA RCDM REN 443/2011 29/04/2015 28/04/2037 705,073.18
  FOZ DO CHAPECO EL 138 kV FOZ DO CHAPECO  DIST1 DIT   002/2011 IPCA RPEC CC 002/2011 16/06/2011 16/06/2041 301,019.54
  FOZ DO CHAPECO EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS RB FT LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS 002/2011 IPCA RBNI REA 6427/2017 7/1/2017 27/10/2040 150,986.96
  FOZ DO CHAPECO EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 540,990.02
  FOZ DO CHAPECO EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 540,990.02
  FOZ DO CHAPECO EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC 002/2011 IPCA RBNI REA 6454/2017 7/1/2017 15/06/2047 151,364.78
  FOZ DO CHAPECO EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC 002/2011 IPCA RBNI REA 6454/2017 7/1/2017 15/06/2047 151,364.78
  FOZ DO CHAPECO IB 138 kV MG 230 kV FOZ DO CHAPECO MG1 RS IB1 DIT   002/2011 IPCA RPEC CC 002/2011 16/06/2011 16/06/2041 153,694.71
  FOZ DO CHAPECO MC 138 kV TR 230/138 kV FOZ DO CHAPECO TR1 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR1 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041 219,036.71
  FOZ DO CHAPECO MC 138 kV TR 230/138 kV FOZ DO CHAPECO TR2 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR2 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041 219,036.71
  FOZ DO CHAPECO MC 138 kV TR 230/138 kV FOZ DO CHAPECO TR3 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR3 RS 002/2011 IPCA RBNI REA 4056/2013 15/05/2015 15/05/2037 443,776.12
  FOZ DO CHAPECO MC 230 kV TR 230/138 kV FOZ DO CHAPECO TR1 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR1 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041 287,627.83
  FOZ DO CHAPECO MC 230 kV TR 230/138 kV FOZ DO CHAPECO TR2 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR2 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041 287,627.83
  FOZ DO CHAPECO MC 230 kV TR 230/138 kV FOZ DO CHAPECO TR3 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR3 RS 002/2011 IPCA RBNI REA 4056/2013 15/05/2015 15/05/2039 561,736.74
  FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG1 RS RB FT MG 230 kV FOZ DO CHAPECO MG1 RS 002/2011 IPCA RBNI REA 6427/2017 7/1/2017 27/10/2047 39,108.80
  FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG1 RS RB FT MG 230 kV FOZ DO CHAPECO MG1 RS 002/2011 IPCA RBNI REA 4056/2013 15/05/2015 15/05/2047 90,135.60
  FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG1 RS RB FT MG 230 kV FOZ DO CHAPECO MG1 RS 002/2011 IPCA RBNI REN 443/2011 29/04/2015 28/04/2046 67,634.81
  FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG2 RS RB FT MG 230 kV FOZ DO CHAPECO MG2 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041 613,238.77
  FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG2 RS RB FT MG 230 kV FOZ DO CHAPECO MG2 RS 002/2011 IPCA RBNI REA 6454/2017 7/1/2017 15/06/2040 48,306.80
  FOZ DO CHAPECO TR 230/138 kV FOZ DO CHAPECO TR1 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR1 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041 644,502.94
  FOZ DO CHAPECO TR 230/138 kV FOZ DO CHAPECO TR2 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR2 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041 644,502.94
  FOZ DO CHAPECO TR 230/138 kV FOZ DO CHAPECO TR3 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR3 RS 002/2011 IPCA RBNI REA 4056/2013 15/05/2015 15/05/2050 817,348.95
  GARIBALDI 1 EL 230 kV GARIBALDI 1 LT 230 kV MONTE CLARO /GARIBALDI 1 C-1 RS RB FT LT 230 kV MONTE CLARO /GARIBALDI 1 C-1 RS 012/2010 IPCA RBL CC 012/2010 19/07/2013 10/6/2040 650,609.45
  GASPAR 2 EL 230 kV GASPAR 2 LT 230 kV BIGUACU /GASPAR 2 C-1 SC RB FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC 057/2001 IPCA RBNI REA 7009/2018 7/1/2018 22/01/2040 110,705.05
  GASPAR 2 EL 230 kV GASPAR 2 LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RBNI REA 7009/2018 7/1/2018 22/01/2040 110,705.05
  GASPAR 2 EL 230 kV GASPAR 2 LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBNI REA 4802/2014 30/09/2016 29/09/2046 1,042,667.75
  GASPAR 2 EL 230 kV GASPAR 2 LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBNI REA 4802/2014 30/09/2016 29/09/2046 1,042,667.75
  GASPAR 2 MG 230 kV GASPAR 2 MG2 SC RB FT MG 230 kV GASPAR 2 MG2 SC 057/2001 IPCA RBNI REA 4802/2014 30/09/2016 29/09/2043 463,316.86
  GRAVATAI EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBNI REA 5861/2016 6/5/2019 6/4/2034 31,027.03
  GRAVATAI EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RMEL REN 643/2014 18/05/2014 17/05/2037 37,675.39
  GRAVATAI EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RMEL REN 643/2014 13/03/2016 3/12/2046 53,681.06
  GRAVATAI EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  GRAVATAI EL 525 kV GRAVATAI LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  GRAVATAI EL 525 kV GRAVATAI LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 205,347.83
  GRAVATAI EL 525 kV GRAVATAI LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 481,832.85
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB1 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBNI REA 5861/2016 6/7/2019 6/6/2034 18,923.44
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB1 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB1 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,332.74
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB2 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB2 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,332.74
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB2 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBNI REA 5861/2016 6/7/2019 6/6/2034 18,923.44
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB3 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBNI REA 5861/2016 6/7/2019 6/6/2034 18,923.44
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB3 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB3 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,332.74
  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RMEL REN 643/2014 20/10/2013 19/10/2036 17,738.81
  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBNI REA 4347/2013 4/12/2015 4/11/2045 36,859.48
  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 85,297.77

 

 

25 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 85,297.77
  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBNI REA 4347/2013 4/12/2015 4/11/2045 36,859.48
  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RMEL REN 643/2014 12/8/2013 12/7/2036 17,827.92
  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBNI REA 4347/2013 4/12/2015 4/11/2045 36,859.48
  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 85,297.77
  GRAVATAI MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 317,792.38
  GRAVATAI MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 169,692.72
  GRAVATAI MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RBNI REA 5861/2016 17/06/2019 16/06/2034 40,531.08
  GRAVATAI MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RMEL REN 643/2014 4/8/2015 4/7/2038 38,904.40
  GRAVATAI MC 525 kV RTL 525 kV 150 Mvar GRAVATAI RT1 RS RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RBNI REA 5861/2016 17/06/2019 16/06/2034 40,531.08
  GRAVATAI MC 525 kV RTL 525 kV 150 Mvar GRAVATAI RT1 RS RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2039 13,745.87
  GRAVATAI MC 525 kV RTL 525 kV 150 Mvar GRAVATAI RT1 RS RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 205,632.32
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RMEL REN 643/2014 4/10/2016 4/9/2039 40,296.02
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBNI REA 5861/2016 6/3/2019 6/2/2034 46,532.11
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBNI REA 5861/2016 6/3/2019 6/2/2034 46,532.11
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RMEL REN 643/2014 5/1/2014 30/04/2037 37,611.11
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 181,238.45
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 181,238.45
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RMEL REN 643/2014 4/8/2015 4/7/2039 53,737.92
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBNI REA 5861/2016 6/3/2019 6/2/2034 46,532.11
  GRAVATAI MG 525 kV GRAVATAI MG1 RS RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RMEL REN 643/2014 27/10/2014 26/10/2031 10,085.89
  GRAVATAI MG 525 kV GRAVATAI MG1 RS RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RMEL REN 643/2014 17/10/2014 16/10/2031 10,072.46
  GRAVATAI MG 525 kV GRAVATAI MG1 RS RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,315,647.96
  GRAVATAI RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RMEL REA 9918/2021 27/05/2021 27/05/2057 504,366.58
  GRAVATAI RTB 525 kV 150 Mvar GRAVATAI RT2D RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2D RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 633,727.45
  GRAVATAI RTB 525 kV 150 Mvar GRAVATAI RT2D RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2D RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,393.68
  GRAVATAI RTB 525 kV 150 Mvar GRAVATAI RT2D RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2D RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 794,014.68
  GRAVATAI RTB 525 kV 50 Mvar GRAVATAI RTR1 RS RB FT RTB 525 kV 50 Mvar GRAVATAI RTR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 211,242.48
  GRAVATAI RTB 525 kV 50 Mvar GRAVATAI RTR1 RS RB FT RTB 525 kV 50 Mvar GRAVATAI RTR1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 112,797.89
  GRAVATAI RTB 525 kV 50 Mvar GRAVATAI RTR1 RS RB FT RTB 525 kV 50 Mvar GRAVATAI RTR1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 264,671.56
  GRAVATAI RTL 525 kV 150 Mvar GRAVATAI RT1 RS RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 633,727.45
  GRAVATAI RTL 525 kV 150 Mvar GRAVATAI RT1 RS RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,393.68
  GRAVATAI RTL 525 kV 150 Mvar GRAVATAI RT1 RS RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 794,014.68
  GRAVATAI TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RMEL REA 9918/2021 27/05/2021 27/05/2056 1,433,132.98
  GRAVATAI TR 525/230 kV GRAVATAI TR1D RS RB FT TR 525/230 kV GRAVATAI TR1D RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  GRAVATAI TR 525/230 kV GRAVATAI TR1D RS RB FT TR 525/230 kV GRAVATAI TR1D RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 845,982.69
  GRAVATAI TR 525/230 kV GRAVATAI TR1D RS RB FT TR 525/230 kV GRAVATAI TR1D RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,985,033.14
  GRAVATAI TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  GRAVATAI TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 845,982.69
  GRAVATAI TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,985,033.14
  GRAVATAI TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  GRAVATAI TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 845,982.69
  GRAVATAI TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,985,033.14
  GRAVATAI TR 525/230 kV GRAVATAI TRR1 RS RB FT TR 525/230 kV GRAVATAI TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 528,105.26
  GRAVATAI TR 525/230 kV GRAVATAI TRR1 RS RB FT TR 525/230 kV GRAVATAI TRR1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 281,994.23
  GRAVATAI 2 BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 202,441.54
  GRAVATAI 2 BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS 057/2001 IPCA RMEL REN 643/2014 16/08/2015 15/08/2043 20,888.04
  GRAVATAI 2 BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS 057/2001 IPCA RMEL REN 643/2014 23/08/2015 22/08/2043 20,897.68
  GRAVATAI 2 BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 202,441.54
  GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS 057/2001 IPCA RBNI REA 4347/2013 9/10/2015 9/9/2045 37,302.53
  GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS 057/2001 IPCA RBNI REA 5861/2016 6/7/2019 6/6/2034 85,672.58
  GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 147,962.61
  GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 147,962.61
  GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS 057/2001 IPCA RBNI REA 5861/2016 6/7/2019 6/6/2034 85,672.58
  GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS 057/2001 IPCA RBNI REA 4347/2013 9/10/2015 9/9/2045 37,302.53
  GRAVATAI 3 EL 230 kV GRAVATAI 3 LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS RB FT LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  GRAVATAI 3 EL 230 kV GRAVATAI 3 LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS RB FT LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  GRAVATAI 3 EL 230 kV GRAVATAI 3 LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS RB FT LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  GRAVATAI 3 EL 69 kV GRAVATAI 3  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  GRAVATAI 3 EL 69 kV GRAVATAI 3  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  GRAVATAI 3 EL 69 kV GRAVATAI 3  DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  GRAVATAI 3 IB 230 kV MG 230 kV GRAVATAI 3 MG1 RS IB1 RB FT MG 230 kV GRAVATAI 3 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  GRAVATAI 3 IB 69 kV MG 230 kV GRAVATAI 3 MG1 RS IB2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,699.48
  GRAVATAI 3 MC 230 kV TR 230/69 kV GRAVATAI 3 TR1 RS RBF FT TR 230/69 kV GRAVATAI 3 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  GRAVATAI 3 MC 69 kV TR 230/69 kV GRAVATAI 3 TR1 RS RBF FT TR 230/69 kV GRAVATAI 3 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,336.76
  GRAVATAI 3 MG 230 kV GRAVATAI 3 MG1 RS RB FT MG 230 kV GRAVATAI 3 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,048.90
  GRAVATAI 3 TR 230/69 kV GRAVATAI 3 TR1 RS RBF FT TR 230/69 kV GRAVATAI 3 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 511,196.41
  GRAVATAI 3 TR 230/69 kV GRAVATAI 3 TRR1 RS RBF FT TR 230/69 kV GRAVATAI 3 TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,398.80
  GUARITA EL 230 kV GUARITA LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS RB FT LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS 002/2011 IPCA RBNI REA 6427/2017 7/1/2017 27/10/2040 150,986.96
  GUARITA MG 230 kV GUARITA MG2 RS RB FT MG 230 kV GUARITA MG2 RS 002/2011 IPCA RBNI REA 6427/2017 7/1/2017 27/10/2047 39,108.80
  IJUI 2 EL 69 kV IJUI 2  PARA CERILUZ DIT   011/2010 IPCA RPEC CC 011/2010 10/6/2010 10/6/2040 118,407.47
  IJUI 2 EL 69 kV IJUI 2  PARA DEMEI DIT   011/2010 IPCA RPEC CC 011/2010 10/6/2010 10/6/2040 118,407.47
  IJUI 2 EL 69 kV IJUI 2  PARA IJUI 1 DIT   011/2010 IPCA RPEC CC 011/2010 10/6/2010 10/6/2040 118,407.47
  IJUI 2 EL 69 kV IJUI 2  PARA PANAMBI DIT   011/2010 IPCA RPEC CC 011/2010 10/6/2010 10/6/2040 118,407.47
  IJUI 2 IB 230 kV MG 230 kV IJUI 2 MG1 RS IB1 RB FT MG 230 kV IJUI 2 MG1 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 255,457.46
  IJUI 2 IB 69 kV MG 230 kV IJUI 2 MG1 RS IB1 DIT   011/2010 IPCA RPEC CC 011/2010 10/6/2010 10/6/2040 67,670.38
  IJUI 2 MC 230 kV TR 230/69 kV IJUI 2 TR1 RS RBF FT TR 230/69 kV IJUI 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 346,054.26
  IJUI 2 MC 230 kV TR 230/69 kV IJUI 2 TR2 RS RBF FT TR 230/69 kV IJUI 2 TR2 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 346,054.26
  IJUI 2 MC 230 kV TR 230/69 kV IJUI 2 TR3 RS RBF FT TR 230/69 kV IJUI 2 TR3 RS 011/2010 IPCA RBNI REA 7152/2018 1/9/2021 1/9/2044 1,062,044.45
  IJUI 2 MC 69 kV TR 230/69 kV IJUI 2 TR1 RS RBF FT TR 230/69 kV IJUI 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 137,626.15
  IJUI 2 MC 69 kV TR 230/69 kV IJUI 2 TR2 RS RBF FT TR 230/69 kV IJUI 2 TR2 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 137,626.15
  IJUI 2 MC 69 kV TR 230/69 kV IJUI 2 TR3 RS RBF FT TR 230/69 kV IJUI 2 TR3 RS 011/2010 IPCA RBNI REA 7152/2018 1/9/2021 1/9/2044 378,713.46
  IJUI 2 MG 230 kV IJUI 2 MG1 RS RB FT MG 230 kV IJUI 2 MG1 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 1,059,501.57
  IJUI 2 MG 230 kV IJUI 2 MG1 RS RB FT MG 230 kV IJUI 2 MG1 RS 011/2010 IPCA RBNI REA 7152/2018 1/9/2021 1/9/2052 119,967.18
  IJUI 2 MG 230 kV IJUI 2 MG1 RS RB FT MG 230 kV IJUI 2 MG1 RS 011/2010 IPCA RBNI REA 7152/2018 1/9/2021 1/9/2052 33,737.86
  IJUI 2 TR 230/69 kV IJUI 2 TR1 RS RBF FT TR 230/69 kV IJUI 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 850,763.94
  IJUI 2 TR 230/69 kV IJUI 2 TR2 RS RBF FT TR 230/69 kV IJUI 2 TR2 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 850,763.94
  IJUI 2 TR 230/69 kV IJUI 2 TR3 RS RBF FT TR 230/69 kV IJUI 2 TR3 RS 011/2010 IPCA RBNI REA 7152/2018 1/9/2021 1/9/2055 1,192,229.49
  ILHOTA CS 20/-20 Mvar ILHOTA CS1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 675,679.83
  ILHOTA CS 20/-20 Mvar ILHOTA CS2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 675,679.83
  ILHOTA EL 138 kV ILHOTA LT 138 kV BLUMENAU /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  ILHOTA EL 138 kV ILHOTA LT 138 kV GASPAR /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) C-1 SC DIT   057/2001 IPCA RMEL REN 643/2014 15/03/2014 14/03/2037 11,081.94
  ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) C-1 SC DIT   057/2001 IPCA RCDM REA 2837/2011 12/8/2012 12/7/2042 26,263.13
  ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /ITAJAI C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 74,417.37
  ILHOTA EL 69 kV ILHOTA  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  ILHOTA EL 69 kV ILHOTA  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  ILHOTA EL 69 kV ILHOTA  DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  ILHOTA MC 13,8 kV TR 138/69 kV ILHOTA TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,781.98
  ILHOTA MC 13,8 kV TR 138/69 kV ILHOTA TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,781.98
  ILHOTA MC 138 kV TR 138/69 kV ILHOTA TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,252.15
  ILHOTA MC 138 kV TR 138/69 kV ILHOTA TR1 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048 25,520.55
  ILHOTA MC 138 kV TR 138/69 kV ILHOTA TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,252.15

 

 

26 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  ILHOTA MC 138 kV TR 138/69 kV ILHOTA TR2 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048 25,520.55
  ILHOTA MC 69 kV TR 138/69 kV ILHOTA TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,627.38
  ILHOTA MC 69 kV TR 138/69 kV ILHOTA TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,627.38
  ILHOTA MG 138 kV ILHOTA MG1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 318,092.81
  ILHOTA MG 138 kV ILHOTA MG1 SC DIT   057/2001 IPCA RMEL REN 643/2014 13/05/2013 5/12/2030 19,352.04
  ILHOTA TR 138/69 kV ILHOTA TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 170,568.45
  ILHOTA TR 138/69 kV ILHOTA TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 170,568.45
  ILHOTA TR 138/69 kV ILHOTA TRR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 170,568.45
  IMBITUBA EL 138 kV IMBITUBA LT 138 kV IMBITUBA /PAL.PINHEIRA C-1 SC DIT   057/2001 IPCA RCDM REA 2879/2011 2/6/2016 2/5/2044 25,303.40
  ITA EL 500 kV ITA LT 500 kV CAXIAS /ITA C-1 RS/SC RB FT LT 500 kV CAXIAS /ITA C-1 RS/SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  ITA EL 500 kV ITA LT 500 kV CAXIAS /ITA C-1 RS/SC RB FT LT 500 kV CAXIAS /ITA C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 643/2014 14/05/2014 13/05/2037 37,660.26
  ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 443/2011 30/05/2015 29/05/2032 10,374.73
  ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 443/2011 18/04/2016 17/04/2031 18,223.07
  ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 205,347.83
  ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 481,832.85
  ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 205,347.83
  ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 25/08/2014 24/08/2045 1,945.42
  ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-2 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC 004/2012 IPCA RBNI REA 5861/2016 26/04/2020 25/04/2035 11,621.35
  ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-2 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC 004/2012 IPCA RBNI REA 8314/2019 26/04/2020 25/04/2035 11,621.35
  ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-2 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC 004/2012 IPCA RBL CC 004/2012 2/4/2014 5/10/2042 901,673.32
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RMEL REN 643/2014 28/01/2015 27/01/2046 656.42
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBNI REA 3578/2012 5/5/2017 5/4/2040 38,234.16
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 205,347.83
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBL CC 004/2012 8/6/2014 5/10/2042 901,673.32
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBNI REA 5861/2016 26/04/2020 25/04/2035 11,621.35
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBNI REA 8314/2019 26/04/2020 25/04/2035 11,621.35
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB1 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB2 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB5 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB5 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,332.74
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB5 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 451,293.94
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB6 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB6 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,332.74
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB6 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 451,293.94
  ITA IB 500 kV MG 500 kV ITA MG4 SC IB7 RB FT MG 500 kV ITA MG4 SC 004/2012 IPCA RBL CC 004/2012 8/6/2014 5/10/2042 854,401.63
  ITA MC 500 kV RTB 500 kV 150 Mvar ITA RT1 SC RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 317,792.38
  ITA MC 500 kV RTB 500 kV 150 Mvar ITA RT1 SC RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 169,692.72
  ITA MC 500 kV RTB 500 kV 150 Mvar ITA RT1 SC RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RMEL REN 643/2014 6/11/2014 6/10/2047 1,808.12
  ITA MG 500 kV ITA MG1 SC RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,140,168.19
  ITA MG 500 kV ITA MG1 SC RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RMEL REN 443/2011 30/05/2015 29/05/2032 10,374.73
  ITA MG 500 kV ITA MG1 SC RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  ITA RTB 500 kV 150 Mvar ITA RT1 SC RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 633,727.45
  ITA RTB 500 kV 150 Mvar ITA RT1 SC RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,393.68
  ITA RTB 500 kV 150 Mvar ITA RT1 SC RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 794,014.68
  ITA RTB 500 kV 50 Mvar ITA RTR1 SC RB FT RTB 500 kV 50 Mvar ITA RTR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 211,242.48
  ITA RTB 500 kV 50 Mvar ITA RTR1 SC RB FT RTB 500 kV 50 Mvar ITA RTR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 112,797.89
  ITA RTB 500 kV 50 Mvar ITA RTR1 SC RB FT RTB 500 kV 50 Mvar ITA RTR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 264,671.56
  ITAJAI EL 138 kV ITAJAI  BRUSQUE C2 DIT   057/2001 IPCA RCDM REN 443/2011 19/06/2019 18/06/2047 765,141.08
  ITAJAI EL 138 kV ITAJAI  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  ITAJAI EL 138 kV ITAJAI  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  ITAJAI EL 138 kV ITAJAI  ITAIPAVA C2 DIT   057/2001 IPCA RCDM REN 443/2011 19/06/2019 18/06/2047 765,141.08
  ITAJAI EL 138 kV ITAJAI LT 138 kV CAMBORIU M.B. /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  ITAJAI EL 138 kV ITAJAI LT 138 kV ILHOTA /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  ITAJAI EL 138 kV ITAJAI LT 138 kV ILHOTA /ITAJAI C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  ITAJAI EL 138 kV ITAJAI LT 138 kV ITAJAI /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  ITAJAI EL 230 kV ITAJAI LT 230 kV BLUMENAU /ITAJAI C-1 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  ITAJAI EL 230 kV ITAJAI LT 230 kV BLUMENAU /ITAJAI C-2 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  ITAJAI IB 138 kV MG 230 kV ITAJAI MG1 SC IB2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,975.81
  ITAJAI IB 230 kV MG 230 kV ITAJAI MG1 SC IB1 RB FT MG 230 kV ITAJAI MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  ITAJAI MC 138 kV TR 230/138 kV ITAJAI TR1 SC RBF FT TR 230/138 kV ITAJAI TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,461.21
  ITAJAI MC 138 kV TR 230/138 kV ITAJAI TR2 SC RBF FT TR 230/138 kV ITAJAI TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,461.21
  ITAJAI MC 138 kV TR 230/138 kV ITAJAI TR3 SC RBF FT TR 230/138 kV ITAJAI TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,461.21
  ITAJAI MC 138 kV TR 230/138 kV ITAJAI TR4 SC RBF FT TR 230/138 kV ITAJAI TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,461.21
  ITAJAI MC 230 kV TR 230/138 kV ITAJAI TR1 SC RBF FT TR 230/138 kV ITAJAI TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  ITAJAI MC 230 kV TR 230/138 kV ITAJAI TR2 SC RBF FT TR 230/138 kV ITAJAI TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  ITAJAI MC 230 kV TR 230/138 kV ITAJAI TR3 SC RBF FT TR 230/138 kV ITAJAI TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  ITAJAI MC 230 kV TR 230/138 kV ITAJAI TR4 SC RBF FT TR 230/138 kV ITAJAI TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  ITAJAI MG 230 kV ITAJAI MG1 SC RB FT MG 230 kV ITAJAI MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 501,404.72
  ITAJAI MG 230 kV ITAJAI MG1 SC RB FT MG 230 kV ITAJAI MG1 SC 057/2001 IPCA RBNI REN 443/2011 19/06/2019 18/06/2050 81,503.84
  ITAJAI MG 230 kV ITAJAI MG1 SC RB FT MG 230 kV ITAJAI MG1 SC 057/2001 IPCA RBNI REN 443/2011 19/06/2019 18/06/2050 81,503.84
  ITAJAI TR 230/138 kV ITAJAI TR1 SC RBF FT TR 230/138 kV ITAJAI TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  ITAJAI TR 230/138 kV ITAJAI TR2 SC RBF FT TR 230/138 kV ITAJAI TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  ITAJAI TR 230/138 kV ITAJAI TR3 SC RBF FT TR 230/138 kV ITAJAI TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  ITAJAI TR 230/138 kV ITAJAI TR4 SC RBF FT TR 230/138 kV ITAJAI TR4 SC 057/2001 IPCA RBNI REA 3339/2012 22/11/2014 21/11/2048 1,548,926.79
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBNI REA 8314/2019 13/10/2019 10/12/2034 11,382.12
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RMEL REN 443/2011 17/10/2015 16/10/2038 39,630.46
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034 3,051,476.51
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RMEL REN 643/2014 16/06/2014 15/06/2045 876.91
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RBNI REA 8314/2019 13/10/2019 10/12/2034 14,161.08
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RMEL REN 443/2011 16/12/2016 15/12/2039 41,241.41
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RMEL REN 643/2014 21/10/2015 20/10/2046 2,307.65
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 205,347.83
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 481,832.85
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RMEL REN 643/2014 4/9/2014 4/8/2045 1,567.99
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RMEL REN 443/2011 14/12/2016 13/12/2039 41,233.85
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-3 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-3 PR 057/2001 IPCA RMEL REN 643/2014 16/06/2014 15/06/2045 231.14
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-3 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-3 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-3 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-3 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 205,347.83
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 481,832.85
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RMEL REN 643/2014 22/09/2014 21/09/2045 1,877.48
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RMEL REN 443/2011 13/09/2015 9/12/2038 39,501.89
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RMEL REN 643/2014 16/02/2014 15/02/2037 37,331.27
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RMEL REN 643/2014 11/2/2014 11/1/2045 2,245.74
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16

 

 

27 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR 004/2004 IGPM RBNI REA 5861/2016 31/05/2019 30/05/2034 15,120.50
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR 004/2004 IGPM RMEL REN 643/2014 30/11/2014 29/11/2045 877.67
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034 3,051,476.51
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB1 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB1 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,332.74
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB1 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 451,293.94
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB2 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB2 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,332.74
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB2 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 451,293.94
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB3 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB3 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,332.74
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB3 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 451,293.94
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB5 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  IVAIPORA MG 500 kV IVAIPORA MG1 PR RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  IVAIPORA MG 500 kV IVAIPORA MG1 PR RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,539,785.62
  IVAIPORA MG 500 kV IVAIPORA MG1 PR RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 822,204.76
  IVAIPORA RTL 500 kV 150 Mvar IVAIPORA RT1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RMEL REN 643/2014 8/12/2015 8/11/2051 825.19
  IVAIPORA RTL 500 kV 150 Mvar IVAIPORA RT1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034 2,538,684.38
  IVINHEMA 2 IB 138 kV MG 230 kV IVINHEMA 2 MG3 MS IB1 DIT   008/2014 IPCA RPEC CC 008/2014 29/01/2016 29/01/2044 314,981.14
  IVINHEMA 2 MC 138 kV TR 230/138 kV IVINHEMA 2 TR1 MS RBF FT TR 230/138 kV IVINHEMA 2 TR1 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044 189,158.62
  IVINHEMA 2 MC 138 kV TR 230/138 kV IVINHEMA 2 TR2 MS RBF FT TR 230/138 kV IVINHEMA 2 TR2 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044 189,158.62
  IVINHEMA 2 MC 230 kV TR 230/138 kV IVINHEMA 2 TR1 MS RBF FT TR 230/138 kV IVINHEMA 2 TR1 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044 249,669.22
  IVINHEMA 2 MC 230 kV TR 230/138 kV IVINHEMA 2 TR2 MS RBF FT TR 230/138 kV IVINHEMA 2 TR2 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044 249,669.22
  IVINHEMA 2 MG 230 kV IVINHEMA 2 MG3 MS RB FT MG 230 kV IVINHEMA 2 MG3 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044 1,289,641.41
  IVINHEMA 2 TR 230/138 kV IVINHEMA 2 TR1 MS RBF FT TR 230/138 kV IVINHEMA 2 TR1 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044 713,551.41
  IVINHEMA 2 TR 230/138 kV IVINHEMA 2 TR2 MS RBF FT TR 230/138 kV IVINHEMA 2 TR2 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044 713,551.41
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV C.B.CATARINEN /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV IMBITUBA /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV J.LACERDA-A /U.JLACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV J.LACERDA-A /U.JLACERDA-A C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV J.LACERDA-A /U.JLACERDA-A C-3 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV LAGES /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV PALHOCA ESU /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RMEL REN 643/2014 7/10/2013 7/9/2036 10,804.30
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV PALHOCA ESU /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  J.LACERDA-A EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  J.LACERDA-A EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  J.LACERDA-A EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /U.JLACERDA-A C-4 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 175,165.31
  J.LACERDA-A EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /U.JLACERDA-A C-6 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 175,165.31
  J.LACERDA-A EL 69 kV J.LACERDA-A  BRACO NORTE DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 57,069.80
  J.LACERDA-A EL 69 kV J.LACERDA-A  TUBARAO C1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 57,069.80
  J.LACERDA-A EL 69 kV J.LACERDA-A  TUBARAO C2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 57,069.80
  J.LACERDA-A IB 138 kV MG 230 kV J.LACERDA-A MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,975.81
  J.LACERDA-A IB 230 kV MG 230 kV J.LACERDA-A MG1 SC IB2 RB FT MG 230 kV J.LACERDA-A MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,853.32
  J.LACERDA-A MC 138 kV TR 230/138 kV J.LACERDA-A TR5 SC RBF FT TR 230/138 kV J.LACERDA-A TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 91,732.86
  J.LACERDA-A MC 138 kV TR 230/138 kV J.LACERDA-A TR7 SC RBF FT TR 230/138 kV J.LACERDA-A TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 91,732.86
  J.LACERDA-A MC 230 kV TR 230/138 kV J.LACERDA-A TR5 SC RBF FT TR 230/138 kV J.LACERDA-A TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  J.LACERDA-A MC 230 kV TR 230/138 kV J.LACERDA-A TR5 SC RBF FT TR 230/138 kV J.LACERDA-A TR5 SC 057/2001 IPCA RMEL REN 643/2014 9/10/2014 9/9/2037 18,329.92
  J.LACERDA-A MC 230 kV TR 230/138 kV J.LACERDA-A TR7 SC RBF FT TR 230/138 kV J.LACERDA-A TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RMEL REN 643/2014 11/2/2014 11/1/2048 1,245.14
  J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 63,996.32
  J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 150,162.44
  J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR11 SC RBF FT TR 230/69 kV J.LACERDA-A TR11 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR11 SC RBF FT TR 230/69 kV J.LACERDA-A TR11 SC 057/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2048 69.53
  J.LACERDA-A MC 69 kV TR 138/69 kV J.LACERDA-A TR8 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,244.87
  J.LACERDA-A MC 69 kV TR 138/69 kV J.LACERDA-A TR9 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,244.87
  J.LACERDA-A MC 69 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 45,984.56
  J.LACERDA-A MC 69 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 24,554.54
  J.LACERDA-A MC 69 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RMEL REN 643/2014 8/4/2013 8/3/2036 5,587.69
  J.LACERDA-A MC 69 kV TR 230/69 kV J.LACERDA-A TR11 SC RBF FT TR 230/69 kV J.LACERDA-A TR11 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 45,984.56
  J.LACERDA-A MG 230 kV J.LACERDA-A MG1 SC RB FT MG 230 kV J.LACERDA-A MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 577,836.33
  J.LACERDA-A MG 230 kV J.LACERDA-A MG1 SC RB FT MG 230 kV J.LACERDA-A MG1 SC 057/2001 IPCA RMEL REN 643/2014 25/11/2016 24/11/2048 2,367.61
  J.LACERDA-A MG 230 kV J.LACERDA-A MG1 SC RB FT MG 230 kV J.LACERDA-A MG1 SC 057/2001 IPCA RMEL REN 643/2014 9/11/2014 9/10/2046 2,230.68
  J.LACERDA-A TR 138/69 kV J.LACERDA-A TR8 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 107,761.92
  J.LACERDA-A TR 138/69 kV J.LACERDA-A TR8 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,033.10
  J.LACERDA-A TR 138/69 kV J.LACERDA-A TR9 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 170,568.45
  J.LACERDA-A TR 138/69 kV J.LACERDA-A TR9 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 91,856.33
  J.LACERDA-A TR 138/69 kV J.LACERDA-A TRR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 107,761.92
  J.LACERDA-A TR 230/138 kV J.LACERDA-A TR5 SC RBF FT TR 230/138 kV J.LACERDA-A TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 273,210.06
  J.LACERDA-A TR 230/138 kV J.LACERDA-A TR5 SC RBF FT TR 230/138 kV J.LACERDA-A TR5 SC 057/2001 IPCA RMEL REN 643/2014 9/7/2014 9/6/2042 78,893.27
  J.LACERDA-A TR 230/138 kV J.LACERDA-A TR7 SC RBF FT TR 230/138 kV J.LACERDA-A TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 273,210.06
  J.LACERDA-A TR 230/138 kV J.LACERDA-A TR7 SC RBF FT TR 230/138 kV J.LACERDA-A TR7 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 145,886.94
  J.LACERDA-A TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,952.01
  J.LACERDA-A TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 142,011.34
  J.LACERDA-A TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 333,218.65
  J.LACERDA-A TR 230/69 kV J.LACERDA-A TR11 SC RBF FT TR 230/69 kV J.LACERDA-A TR11 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,952.01
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RMEL REN 643/2014 12/9/2015 12/8/2045 2,325.24
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RMEL REN 643/2014 17/09/2014 16/09/2044 2,244.04
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC 057/2001 IPCA RMEL REN 643/2014 23/07/2014 22/07/2044 2,233.89
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 173,617.08
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 173,617.08
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-3 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 173,617.08
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-4 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 173,617.08
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-4 SC DIT   057/2001 IPCA RMEL REN 643/2014 27/10/2014 26/10/2031 10,306.13
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-4 SC DIT   057/2001 IPCA RMEL REN 643/2014 17/10/2014 16/10/2031 10,292.41
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 186,020.07
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 100,177.50
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 236,032.43
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 168,963.82
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 90,992.19
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 214,390.52
  J.LACERDA-B IB 230 kV MG 230 kV J.LACERDA-B MG1 SC IB1 RB FT MG 230 kV J.LACERDA-B MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  J.LACERDA-B MG 230 kV J.LACERDA-B MG1 SC RB FT MG 230 kV J.LACERDA-B MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 462,438.11
  J.LACERDA-B MG 230 kV J.LACERDA-B MG1 SC RB FT MG 230 kV J.LACERDA-B MG1 SC 057/2001 IPCA RMEL REN 643/2014 25/11/2016 24/11/2036 2,560.36
  J.LACERDA-B MG 230 kV J.LACERDA-B MG1 SC RB FT MG 230 kV J.LACERDA-B MG1 SC 057/2001 IPCA RMEL REN 643/2014 25/11/2016 24/11/2036 2,560.36
  J.LACERDA-B MG 230 kV J.LACERDA-B MG1 SC RB FT MG 230 kV J.LACERDA-B MG1 SC 057/2001 IPCA RBNI REA 6630/2017 28/11/2017 27/11/2034 17,751.56
  JOINV.NORTE BC 230 kV 100 Mvar JOINV.NORTE BC1 SC RB FT BC 230 kV 100 Mvar JOINV.NORTE BC1 SC 057/2001 IPCA RBNI REA 3915/2013 27/02/2015 26/02/2037 363,844.51
  JOINV.NORTE BC 230 kV 100 Mvar JOINV.NORTE BC2 SC RB FT BC 230 kV 100 Mvar JOINV.NORTE BC2 SC 057/2001 IPCA RBNI REA 3915/2013 22/04/2015 21/04/2037 365,590.45
  JOINV.NORTE EL 138 kV JOINV.NORTE  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  JOINV.NORTE EL 138 kV JOINV.NORTE  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  JOINV.NORTE EL 138 kV JOINV.NORTE  DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  JOINV.NORTE EL 138 kV JOINV.NORTE  DIST4 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 141,935.42
  JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RMEL REN 643/2014 27/02/2016 26/02/2045 136.92

 

 

28 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 31/01/2016 30/01/2045 136.62
  JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2040 225.13
  JOINV.NORTE IB 138 kV MG 230 kV JOINV.NORTE MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,975.81
  JOINV.NORTE IB 230 kV MG 230 kV JOINV.NORTE MG1 SC IB1 RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  JOINV.NORTE IB 230 kV MG 230 kV JOINV.NORTE MG1 SC IB1 RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RMEL REN 643/2014 5/4/2016 5/3/2050 98.16
  JOINV.NORTE MC 138 kV TR 230/138 kV JOINV.NORTE TR1 SC RBF FT TR 230/138 kV JOINV.NORTE TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,461.21
  JOINV.NORTE MC 138 kV TR 230/138 kV JOINV.NORTE TR2 SC RBF FT TR 230/138 kV JOINV.NORTE TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,461.21
  JOINV.NORTE MC 138 kV TR 230/138 kV JOINV.NORTE TR3 SC RBF FT TR 230/138 kV JOINV.NORTE TR3 SC 057/2001 IPCA RBNI REA 3161/2011 26/10/2013 25/10/2043 693,439.42
  JOINV.NORTE MC 138 kV TR 230/138 kV JOINV.NORTE TR4 SC RBF FT TR 230/138 kV JOINV.NORTE TR4 SC 057/2001 IPCA RBNI REA 4802/2014 17/08/2016 16/08/2046 760,784.19
  JOINV.NORTE MC 230 kV BC 230 kV 100 Mvar JOINV.NORTE BC1 SC RB FT BC 230 kV 100 Mvar JOINV.NORTE BC1 SC 057/2001 IPCA RBNI REA 3915/2013 27/02/2015 26/02/2045 881,487.76
  JOINV.NORTE MC 230 kV BC 230 kV 100 Mvar JOINV.NORTE BC2 SC RB FT BC 230 kV 100 Mvar JOINV.NORTE BC2 SC 057/2001 IPCA RBNI REA 3915/2013 22/04/2015 21/04/2045 924,091.50
  JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR1 SC RBF FT TR 230/138 kV JOINV.NORTE TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR1 SC RBF FT TR 230/138 kV JOINV.NORTE TR1 SC 057/2001 IPCA RMEL REN 643/2014 4/11/2016 4/10/2050 98.01
  JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR2 SC RBF FT TR 230/138 kV JOINV.NORTE TR2 SC 057/2001 IPCA RMEL REN 643/2014 17/07/2016 16/07/2050 98.67
  JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR2 SC RBF FT TR 230/138 kV JOINV.NORTE TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR3 SC RBF FT TR 230/138 kV JOINV.NORTE TR3 SC 057/2001 IPCA RBNI REA 3161/2011 26/10/2013 25/10/2043 872,002.61
  JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR4 SC RBF FT TR 230/138 kV JOINV.NORTE TR4 SC 057/2001 IPCA RBNI REA 4802/2014 17/08/2016 16/08/2046 956,133.56
  JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 451,318.66
  JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 3161/2011 26/10/2013 25/10/2041 153,679.44
  JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 3161/2011 26/10/2013 25/10/2041 97,473.42
  JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 4802/2014 17/08/2016 16/08/2044 165,419.31
  JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 4802/2014 17/08/2016 16/08/2044 104,985.63
  JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 3915/2013 27/02/2015 26/02/2043 159,274.76
  JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 3915/2013 22/04/2015 21/04/2043 159,892.64
  JOINV.NORTE TR 230/138 kV JOINV.NORTE TR1 SC RBF FT TR 230/138 kV JOINV.NORTE TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  JOINV.NORTE TR 230/138 kV JOINV.NORTE TR2 SC RBF FT TR 230/138 kV JOINV.NORTE TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  JOINV.NORTE TR 230/138 kV JOINV.NORTE TR3 SC RBF FT TR 230/138 kV JOINV.NORTE TR3 SC 057/2001 IPCA RBNI REA 3161/2011 26/10/2013 25/10/2047 1,416,367.20
  JOINV.NORTE TR 230/138 kV JOINV.NORTE TR4 SC RBF FT TR 230/138 kV JOINV.NORTE TR4 SC 057/2001 IPCA RBNI REA 4802/2014 17/08/2016 16/08/2050 1,507,771.28
  JOINVILLE EL 138 kV JOINVILLE  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  JOINVILLE EL 138 kV JOINVILLE  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  JOINVILLE EL 138 kV JOINVILLE  DIST2 DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 26,014.13
  JOINVILLE EL 138 kV JOINVILLE  DIST3 DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 26,014.13
  JOINVILLE EL 138 kV JOINVILLE  DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  JOINVILLE EL 138 kV JOINVILLE  DIST4 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  JOINVILLE EL 138 kV JOINVILLE  DIST4 DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 74,417.37
  JOINVILLE EL 138 kV JOINVILLE  DIST4 DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 175,337.89
  JOINVILLE EL 138 kV JOINVILLE  DIST4 DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 26,014.13
  JOINVILLE EL 138 kV JOINVILLE  DIST5 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  JOINVILLE EL 138 kV JOINVILLE  DIST5 DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 74,417.37
  JOINVILLE EL 138 kV JOINVILLE  DIST5 DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 175,337.89
  JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 26,014.13
  JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 74,417.37
  JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 175,337.89
  JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,185.96
  JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 26,014.13
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2018 29/04/2048 16,339.74
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2018 29/04/2048 16,339.74
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RMEL REN 643/2014 19/09/2014 18/09/2043 388.15
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV JOINVILLE /VEGA DO SUL C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 175,165.31
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV JOINVILLE /VEGA DO SUL C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 175,165.31
  JOINVILLE EL 69 kV JOINVILLE  DIST6 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 57,069.80
  JOINVILLE EL 69 kV JOINVILLE  DIST7 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 57,069.80
  JOINVILLE IB 138 kV MG 230 kV JOINVILLE MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,975.81
  JOINVILLE IB 230 kV MG 230 kV JOINVILLE MG1 SC IB1 RB FT MG 230 kV JOINVILLE MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,853.32
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 26,014.13
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,252.15
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,252.15
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 26,014.13
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RMEL REN 643/2014 12/3/2015 12/2/2045 2,324.15
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 26,014.13
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RCDM REA 2879/2011 17/08/2012 16/08/2040 127,290.71
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,252.15
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 91,732.86
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 48,982.92
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBNI REA 2837/2011 19/08/2012 18/08/2042 26,014.13
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBNIA REA 7576/2019     69,098.56
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 91,732.86
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 48,982.92
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 114,934.64
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR6 SC RBF FT TR 230/138 kV JOINVILLE TR6 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 91,732.86
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 91,732.86
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBNI REA 2879/2011 28/06/2012 27/06/2040 218,891.41
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBNI REA 2837/2011 19/08/2012 18/08/2042 26,014.13
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBNIA REA 7576/2019     78,498.04
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBNIA REA 7576/2019     268,490.59
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBNIA REA 7576/2019     25,181.81
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR6 SC RBF FT TR 230/138 kV JOINVILLE TR6 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR6 SC RBF FT TR 230/138 kV JOINVILLE TR6 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 6/12/2044 593.78
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR6 SC RBF FT TR 230/138 kV JOINVILLE TR6 SC 057/2001 IPCA RBNIA REA 7576/2019     24,532.64
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBNIA REA 7576/2019     186,420.99
  JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 63,996.32
  JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 150,162.44
  JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RMEL REN 643/2014 10/6/2013 10/5/2036 17,713.35
  JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 6/12/2044 1,335.99
  JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBNIA REA 7576/2019     356,362.98
  JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,244.87
  JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,244.87
  JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048 17,665.10
  JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,244.87
  JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048 17,665.10
  JOINVILLE MC 69 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 45,984.56
  JOINVILLE MC 69 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 24,554.54
  JOINVILLE MC 69 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBNIA REA 7576/2019     157,051.63
  JOINVILLE MG 230 kV JOINVILLE MG1 SC RB FT MG 230 kV JOINVILLE MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 643,021.42
  JOINVILLE MG 230 kV JOINVILLE MG1 SC RB FT MG 230 kV JOINVILLE MG1 SC 057/2001 IPCA RMEL REN 643/2014 3/8/2013 3/7/2030 18,970.37
  JOINVILLE MG 230 kV JOINVILLE MG1 SC RB FT MG 230 kV JOINVILLE MG1 SC 057/2001 IPCA RBNIA REA 7576/2019     39,516.30
  JOINVILLE TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 170,568.45
  JOINVILLE TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 91,856.33
  JOINVILLE TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,918.32
  JOINVILLE TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 71,580.58
  JOINVILLE TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,918.32

 

 

29 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  JOINVILLE TR 138/69 kV JOINVILLE TRR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,918.32
  JOINVILLE TR 138/69 kV JOINVILLE TRR1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 71,580.58
  JOINVILLE TR 138/69 kV JOINVILLE TRR1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 168,654.03
  JOINVILLE TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 303,647.10
  JOINVILLE TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBNIA REA 7576/2019     1,423,079.33
  JOINVILLE TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  JOINVILLE TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,707.60
  JOINVILLE TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 447,480.68
  JOINVILLE TR 230/138 kV JOINVILLE TR6 SC RBF FT TR 230/138 kV JOINVILLE TR6 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  JOINVILLE TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,687.58
  JOINVILLE TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 141,870.13
  JOINVILLE TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBNIA REA 7576/2019     1,423,079.33
  JOINVILLE TR 230/138 kV JOINVILLE TRR1 SC RBF FT TR 230/138 kV JOINVILLE TRR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,687.58
  JOINVILLE TR 230/138 kV JOINVILLE TRR1 SC RBF FT TR 230/138 kV JOINVILLE TRR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 141,870.13
  JOINVILLE TR 230/138 kV JOINVILLE TRR2 SC RBF FT TR 230/138 kV JOINVILLE TRR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,687.58
  JOINVILLE TR 230/138 kV JOINVILLE TRR2 SC RBF FT TR 230/138 kV JOINVILLE TRR2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 141,870.13
  JOINVILLE TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 289,308.81
  JOINVILLE TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 154,483.25
  JOINVILLE TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 362,483.03
  JOINVILLE TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBNIA REA 7576/2019     1,567,942.94
  JOINVILLE GM EL 138 kV JOINVILLE GM LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RMEL REN 643/2014 31/01/2014 30/01/2037 11,033.79
  JOINVILLE GM EL 138 kV JOINVILLE GM LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RCDM REA 2589/2010 20/05/2012 19/05/2041 682,748.48
  JOINVILLE GM EL 138 kV JOINVILLE GM LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC DIT   057/2001 IPCA RCDM REA 2589/2010 20/05/2012 19/05/2041 682,748.48
  JOINVILLE GM EL 138 kV JOINVILLE GM LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC DIT   057/2001 IPCA RMEL REN 643/2014 6/1/2014 31/05/2037 11,169.25
  JOINVILLE GM MG 138 kV JOINVILLE GM MG1 SC DIT   057/2001 IPCA RCDM REA 2589/2010 20/05/2012 19/05/2039 108,202.95
  JOINVILLE SANTA CATARINA EL 138 kV JOINVILLE SANTA CATARINA LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2044 753,131.18
  JOINVILLE SANTA CATARINA EL 138 kV JOINVILLE SANTA CATARINA LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2044 753,131.18
  JOINVILLE SANTA CATARINA MG 138 kV JOINVILLE SANTA CATARINA MG1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2041 239,951.31
  L.GRANDE EL 138 kV L.GRANDE  JAQUIRANA DIT   011/2010 IPCA RPEC CC 011/2010 10/6/2010 10/6/2040 286,398.50
  L.GRANDE EL 138 kV L.GRANDE  VACARIA DIT   011/2010 IPCA RPEC CC 011/2010 10/6/2010 10/6/2040 286,398.50
  L.GRANDE EL 230 kV L.GRANDE LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS RB FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  L.GRANDE EL 230 kV L.GRANDE LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  L.GRANDE IB 138 kV MG 230 kV L.GRANDE MG2 RS IB1 DIT   011/2010 IPCA RPEC CC 011/2010 10/6/2010 10/6/2040 147,471.48
  L.GRANDE IB 230 kV MG 230 kV L.GRANDE MG1 RS IB1 RB FT MG 230 kV L.GRANDE MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,853.32
  L.GRANDE MC 138 kV TR 230/138 kV L.GRANDE TR1 RS RBF FT TR 230/138 kV L.GRANDE TR1 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 215,013.54
  L.GRANDE MC 138 kV TR 230/138 kV L.GRANDE TR2 RS RBF FT TR 230/138 kV L.GRANDE TR2 RS 011/2010 IPCA RBNI REA 4892/2014 29/09/2016 29/09/2038 705,878.77
  L.GRANDE MC 230 kV TR 230/138 kV L.GRANDE TR1 RS RBF FT TR 230/138 kV L.GRANDE TR1 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 276,686.31
  L.GRANDE MC 230 kV TR 230/138 kV L.GRANDE TR2 RS RBF FT TR 230/138 kV L.GRANDE TR2 RS 011/2010 IPCA RBNI REA 4892/2014 29/09/2016 29/09/2040 922,958.48
  L.GRANDE MG 230 kV L.GRANDE MG1 RS RB FT MG 230 kV L.GRANDE MG1 RS 057/2001 IPCA RBNI REA 5861/2016 17/05/2019 16/05/2036 24,764.36
  L.GRANDE MG 230 kV L.GRANDE MG1 RS RB FT MG 230 kV L.GRANDE MG1 RS 057/2001 IPCA RMEL REN 643/2014 13/03/2013 3/12/2030 21,397.47
  L.GRANDE MG 230 kV L.GRANDE MG2 RS RB FT MG 230 kV L.GRANDE MG2 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 605,555.68
  L.GRANDE MG 230 kV L.GRANDE MG2 RS RB FT MG 230 kV L.GRANDE MG2 RS 011/2010 IPCA RBNI REA 4892/2014 29/09/2016 29/09/2048 135,247.57
  L.GRANDE MG 230 kV L.GRANDE MG2 RS RB FT MG 230 kV L.GRANDE MG2 RS 011/2010 IPCA RBNI REA 4892/2014 29/09/2016 29/09/2047 78,730.83
  L.GRANDE TR 230/138 kV L.GRANDE TR1 RS RBF FT TR 230/138 kV L.GRANDE TR1 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 445,692.02
  L.GRANDE TR 230/138 kV L.GRANDE TR2 RS RBF FT TR 230/138 kV L.GRANDE TR2 RS 011/2010 IPCA RBNI REA 4892/2014 29/09/2016 29/09/2050 1,080,058.33
  LONDRINA COT EL 230 kV LONDRINA COT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2043 898,901.97
  LONDRINA COT EL 230 kV LONDRINA COT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2043 898,901.97
  LONDRINA COT MG 230 kV LONDRINA COT MG2 PR RB FT MG 230 kV LONDRINA COT MG2 PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2042 225,125.88
  LONDRINA COT MG 230 kV LONDRINA COT MG2 PR RB FT MG 230 kV LONDRINA COT MG2 PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2051 110,974.68
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV IBIPORA /LONDRINA ESU C-1 PR RB FT LT 230 kV IBIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV IBIPORA /LONDRINA ESU C-1 PR RB FT LT 230 kV IBIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 95,477.86
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV IBIPORA /LONDRINA ESU C-1 PR RB FT LT 230 kV IBIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RMEL REN 643/2014 17/05/2016 16/05/2046 784.75
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA ESU /APUCARANA C-1 PR 057/2001 IPCA RMEL REN 643/2014 16/12/2013 15/12/2041 37,981.07
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA ESU /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA ESU /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 95,477.86
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP RB FT LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP RB FT LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2043 95,609.76
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP RB FT LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP 057/2001 IPCA RMEL REN 643/2014 9/12/2015 9/11/2045 769.76
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 95,477.86
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /MARINGA C-1 PR RB FT LT 230 kV LONDRINA ESU /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /MARINGA C-1 PR RB FT LT 230 kV LONDRINA ESU /MARINGA C-1 PR 057/2001 IPCA RMEL REN 643/2014 27/04/2014 26/04/2044 199.63
  LONDRINA ESU EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  LONDRINA ESU EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 205,347.83
  LONDRINA ESU EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 481,832.85
  LONDRINA ESU EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RMEL REN 643/2014 8/2/2014 8/1/2037 37,962.79
  LONDRINA ESU EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RMEL REN 643/2014 26/10/2014 25/10/2045 1,954.89
  LONDRINA ESU IB 230 kV MG 500 kV LONDRINA ESU MG1 PR IB1 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  LONDRINA ESU IB 230 kV MG 500 kV LONDRINA ESU MG1 PR IB1 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 58,190.65
  LONDRINA ESU IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB1 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  LONDRINA ESU IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB1 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,332.74
  LONDRINA ESU IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB1 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 451,293.94
  LONDRINA ESU IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB2 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  LONDRINA ESU MC 230 kV TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  LONDRINA ESU MC 230 kV TR 500/230 kV LONDRINA ESU TR4 PR RB FT TR 500/230 kV LONDRINA ESU TR4 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RMEL REN 643/2014 26/04/2015 25/04/2038 38,972.47
  LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RMEL REN 643/2014 6/12/2014 6/11/2042 2,079.38
  LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 181,238.45
  LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR4 PR RB FT TR 500/230 kV LONDRINA ESU TR4 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR4 PR RB FT TR 500/230 kV LONDRINA ESU TR4 PR 057/2001 IPCA RMEL REN 643/2014 13/06/2014 6/12/2042 411.35
  LONDRINA ESU MC 525 kV RTB 525 kV 0 Mvar LONDRINA ESU RB1 PR RB FT RTB 525 kV 150 Mvar LONDRINA ESU RB1 PR 057/2001 IPCA RBNI REA 7152/2018 27/06/2020 27/06/2047 1,512,257.43
  LONDRINA ESU MC 525 kV RTB 525 kV 0 Mvar LONDRINA ESU RB2 PR RB FT RTB 525 kV 150 Mvar LONDRINA ESU RB2 PR 057/2001 IPCA RBNI REA 7152/2018 28/06/2020 28/06/2047 1,512,257.43
  LONDRINA ESU MG 500 kV LONDRINA ESU MG1 PR RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 988,390.77
  LONDRINA ESU MG 500 kV LONDRINA ESU MG1 PR RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBNI REA 7152/2018 27/06/2020 27/06/2039 21,726.37
  LONDRINA ESU RTB 525 kV 0 Mvar LONDRINA ESU RB1 PR RB FT RTB 525 kV 150 Mvar LONDRINA ESU RB1 PR 057/2001 IPCA RBNI REA 7152/2018 27/06/2020 27/06/2055 2,518,303.79
  LONDRINA ESU RTB 525 kV 0 Mvar LONDRINA ESU RB2 PR RB FT RTB 525 kV 150 Mvar LONDRINA ESU RB2 PR 057/2001 IPCA RBNI REA 7152/2018 28/06/2020 28/06/2055 2,518,303.79
  LONDRINA ESU RTB 525 kV 0 Mvar LONDRINA ESU RBR PR RB FT RTB 525 kV 50 Mvar LONDRINA ESU RBR PR 057/2001 IPCA RBNI REA 7152/2018 27/06/2020 27/06/2055 839,434.59
  LONDRINA ESU TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  LONDRINA ESU TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 845,982.69
  LONDRINA ESU TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,985,033.14
  LONDRINA ESU TR 500/230 kV LONDRINA ESU TR4 PR RB FT TR 500/230 kV LONDRINA ESU TR4 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  LONDRINA ESU TR 500/230 kV LONDRINA ESU TRR1 PR RB FT TR 500/230 kV LONDRINA ESU TRR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 528,105.26
  LT  138 kV J.S.CATARINA /PICARRAS      SC LT 138 kV J.S.CATARINA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 664,365.03
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-2 SP/MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 2,905,932.66
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-2 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 3,687,206.09
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-2 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 1,564,933.70
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-3 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 963,818.17
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-3 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 2,270,892.52
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-3 SP/MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,789,718.44
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-4 SP/MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,789,718.44
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-4 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 2,270,892.52
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-4 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 963,818.17
  LT  230 kV CASCAVEL OEST/CASCAVEL      PR LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR RB FT LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 222,474.05
  LT  230 kV CASCAVEL OEST/CASCAVEL      PR LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR RB FT LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 94,814.13
  LT  230 kV CASCAVEL OEST/CASCAVEL      PR LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR RB FT LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 177,563.36
  LT  230 kV CASCAVEL OEST/GUAIRA        PR LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,886,237.02
  LT  230 kV CASCAVEL OEST/GUAIRA        PR LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,363,318.61
  LT  230 kV CASCAVEL OEST/GUAIRA        PR LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,007,200.63

 

30 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  LT  230 kV CASCAVEL OEST/GUAIRA        PR LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBNI REA 3232/2011 19/03/2013 18/03/2041 110,880.62
  LT  230 kV PASSO FUNDO  /U.PASSO FUNDO RS LT 230 kV PASSO FUNDO /U.PASSO FUNDO C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 6,940.44
  LT  230 kV PASSO FUNDO  /U.PASSO FUNDO RS LT 230 kV PASSO FUNDO /U.PASSO FUNDO C-2 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 6,940.44
  LT 138 kV ANASTACIO /AQUIDAUANA MS LT 138 kV ANASTACIO /AQUIDAUANA C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 109,003.43
  LT 138 kV ANASTACIO /AQUIDAUANA MS LT 138 kV ANASTACIO /AQUIDAUANA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,701.68
  LT 138 kV ANASTACIO /AQUIDAUANA MS LT 138 kV ANASTACIO /AQUIDAUANA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 138,309.50
  LT 138 kV ANASTACIO /AQUIDAUANA MS LT 138 kV ANASTACIO /AQUIDAUANA C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 109,003.43
  LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA SC LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2054 506,393.75
  LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA SC LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2054 118,897.50
  LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA SC LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 193,578.63
  LT 138 kV BIGUACU /ITAJAIFAZENDA SC LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RCDM REA 8314/2019 13/07/2020 7/12/2035 278.22
  LT 138 kV BIGUACU /ITAJAIFAZENDA SC LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 366,261.76
  LT 138 kV BIGUACU /ITAJAIFAZENDA SC LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 862,964.72
  LT 138 kV BIGUACU /ITAJAIFAZENDA SC LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 680,113.16
  LT 138 kV BIGUACU /TIJUCAS SC LT 138 kV BIGUACU /TIJUCAS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 358,045.30
  LT 138 kV BIGUACU /TIJUCAS SC LT 138 kV BIGUACU /TIJUCAS C-1 SC DIT   057/2001 IPCA RCDM REA 2879/2011 20/11/2012 19/11/2043 34,528.49
  LT 138 kV BLUMENAU /ILHOTA SC LT 138 kV BLUMENAU /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 534,149.49
  LT 138 kV BLUMENAU /ILHOTA SC LT 138 kV BLUMENAU /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 677,758.05
  LT 138 kV BLUMENAU /ILHOTA SC LT 138 kV BLUMENAU /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 287,655.85
  LT 138 kV CAMBORIU M.B. /ITAJAI SC LT 138 kV CAMBORIU M.B. /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 224,401.98
  LT 138 kV CAMBORIU M.B. /ITAJAI SC LT 138 kV CAMBORIU M.B. /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 95,241.28
  LT 138 kV CAMBORIU M.B. /ITAJAI SC LT 138 kV CAMBORIU M.B. /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 176,853.97
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 774,953.45
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,825,900.41
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,439,014.66
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 886,266.61
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,124,543.49
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 477,281.70
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 477,281.70
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,124,543.49
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 886,266.61
  LT 138 kV D.DAS NACOES /IVINHEMA MS LT 138 kV D.DAS NACOES /IVINHEMA C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 980,315.31
  LT 138 kV D.DAS NACOES /IVINHEMA MS LT 138 kV D.DAS NACOES /IVINHEMA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,243,877.62
  LT 138 kV D.DAS NACOES /IVINHEMA MS LT 138 kV D.DAS NACOES /IVINHEMA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 527,929.81
  LT 138 kV ELDORADO /GUAIRA MS/PR LT 138 kV ELDORADO /GUAIRA C-1 MS/PR DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 120,929.95
  LT 138 kV ELDORADO /GUAIRA MS/PR LT 138 kV ELDORADO /GUAIRA C-1 MS/PR DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 284,928.13
  LT 138 kV ELDORADO /GUAIRA MS/PR LT 138 kV ELDORADO /GUAIRA C-1 MS/PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 224,555.38
  LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,273.23
  LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 50,769.02
  LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 119,619.03
  LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 119,619.03
  LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 50,769.02
  LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,273.23
  LT 138 kV GASPAR /ILHOTA SC LT 138 kV GASPAR /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 148,817.77
  LT 138 kV GASPAR /ILHOTA SC LT 138 kV GASPAR /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 80,142.92
  LT 138 kV GASPAR /ILHOTA SC LT 138 kV GASPAR /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 188,828.11
  LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) SC LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 492,331.53
  LT 138 kV ILHOTA /ITAJAI SC LT 138 kV ILHOTA /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 56,457.83
  LT 138 kV ILHOTA /ITAJAI SC LT 138 kV ILHOTA /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 104,836.80
  LT 138 kV ILHOTA /PICARRAS SC LT 138 kV ILHOTA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 196,652.05
  LT 138 kV ILHOTA /PICARRAS SC LT 138 kV ILHOTA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 105,903.15
  LT 138 kV ILHOTA /PICARRAS SC LT 138 kV ILHOTA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 249,522.86
  LT 138 kV IMBITUBA /J.LACERDA-A SC LT 138 kV IMBITUBA /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 607,229.64
  LT 138 kV IMBITUBA /J.LACERDA-A SC LT 138 kV IMBITUBA /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 327,011.75
  LT 138 kV IMBITUBA /PAL.PINHEIRA SC LT 138 kV IMBITUBA /PAL.PINHEIRA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 665,985.44
  LT 138 kV IMBITUBA /PAL.PINHEIRA SC LT 138 kV IMBITUBA /PAL.PINHEIRA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 358,653.55
  LT 138 kV IMBITUBA /PAL.PINHEIRA SC LT 138 kV IMBITUBA /PAL.PINHEIRA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 845,038.70
  LT 138 kV IMBITUBA /PAL.PINHEIRA SC LT 138 kV IMBITUBA /PAL.PINHEIRA C-1 SC DIT   057/2001 IPCA RCDM REA 2879/2011 2/6/2016 2/5/2047 964,041.06
  LT 138 kV ITAJAI /ITAJAIFAZENDA SC LT 138 kV ITAJAI /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RCDM REA 8314/2019 13/07/2020 7/12/2035 278.22
  LT 138 kV ITAJAI /ITAJAIFAZENDA SC LT 138 kV ITAJAI /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 71,087.06
  LT 138 kV IVINHEMA /IVINHEMA 2 MS LT 138 kV IVINHEMA /IVINHEMA 2 C-1 MS DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2080 570,599.47
  LT 138 kV IVINHEMA /IVINHEMA 2 MS LT 138 kV IVINHEMA /IVINHEMA 2 C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 135,884.78
  LT 138 kV IVINHEMA /IVINHEMA 2 MS LT 138 kV IVINHEMA /IVINHEMA 2 C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 320,163.85
  LT 138 kV IVINHEMA /IVINHEMA 2 MS LT 138 kV IVINHEMA /IVINHEMA 2 C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 252,325.09
  LT 138 kV IVINHEMA 2 /NOVA ANDRADINA MS LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 218,681.74
  LT 138 kV IVINHEMA 2 /NOVA ANDRADINA MS LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 277,475.34
  LT 138 kV IVINHEMA 2 /NOVA ANDRADINA MS LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 117,766.81
  LT 138 kV IVINHEMA 2 /NOVA ANDRADINA MS LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2045 615,657.89
  LT 138 kV JOINVILLE /J.S.CATARINA SC LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 146,957.55
  LT 138 kV JOINVILLE /J.S.CATARINA SC LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 186,467.76
  LT 138 kV JOINVILLE /J.S.CATARINA SC LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,141.14
  LT 138 kV JOINVILLE GM /JOINVILLE SC LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 102,482.80
  LT 138 kV JOINVILLE GM /JOINVILLE SC LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RCDM REA 2589/2010 20/05/2012 19/05/2043 784,123.36
  LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM SC LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 29,150.66
  LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM SC LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2054 20,869.89
  LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM SC LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2054 282,244.73
  LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA MS/SP LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA C-1 MS/SP DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 471,006.83
  LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA MS/SP LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA C-1 MS/SP DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 253,651.60
  LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA MS/SP LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA C-1 MS/SP DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 597,639.19
  LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA MS/SP LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA C-1 MS/SP DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2050 604,309.89
  LT 138 kV PAL.PINHEIRA /PALHOCA ESU SC LT 138 kV PAL.PINHEIRA /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RCDM REA 2879/2011 2/6/2016 2/5/2045 969,556.70
  LT 138 kV PAL.PINHEIRA /PALHOCA ESU SC LT 138 kV PAL.PINHEIRA /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 309,847.52
  LT 138 kV PAL.PINHEIRA /PALHOCA ESU SC LT 138 kV PAL.PINHEIRA /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 131,506.30
  LT 138 kV PAL.PINHEIRA /PALHOCA ESU SC LT 138 kV PAL.PINHEIRA /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 244,194.66
  LT 138 kV PALHOCA ESU /J.LACERDA-A SC LT 138 kV PALHOCA ESU /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,830,958.31
  LT 138 kV PALHOCA ESU /J.LACERDA-A SC LT 138 kV PALHOCA ESU /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 777,100.14
  LT 138 kV PALHOCA ESU /J.LACERDA-A SC LT 138 kV PALHOCA ESU /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,443,000.85
  LT 138 kV TIJUCAS /CAMBORIU M.B. SC LT 138 kV TIJUCAS /CAMBORIU M.B. C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 310,305.93
  LT 230 kV ANASTACIO /DOURADOS MS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,152,197.99
  LT 230 kV ANASTACIO /DOURADOS MS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,949,476.19
  LT 230 kV ANASTACIO /DOURADOS MS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,683,190.28
  LT 230 kV AREIA /PONTA G NORTE PR LT 230 kV AREIA /PONTA G NORTE C-1 PR RB FT LT 230 kV AREIA /PONTA G NORTE C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,714,268.16
  LT 230 kV AREIA /PONTA G NORTE PR LT 230 kV AREIA /PONTA G NORTE C-1 PR RB FT LT 230 kV AREIA /PONTA G NORTE C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,449,347.35
  LT 230 kV AREIA /S. OSORIO PR LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,335,675.58
  LT 230 kV AREIA /S. OSORIO PR LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,247,188.93
  LT 230 kV AREIA /S. OSORIO PR LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,246,311.02
  LT 230 kV AREIA /S. OSORIO PR LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,334,031.48
  LT 230 kV AREIA /S.MATEUS SUL PR LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,415,753.57
  LT 230 kV AREIA /S.MATEUS SUL PR LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,029,547.40
  LT 230 kV AREIA /S.MATEUS SUL PR LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,928,086.97
  LT 230 kV ASSIS /LONDRINA COT SP/PR LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,708,374.73
  LT 230 kV ASSIS /LONDRINA COT SP/PR LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,140,470.02
  LT 230 kV ASSIS /LONDRINA COT SP/PR LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 912,226.88
  LT 230 kV ATLANTIDA 2 /GRAVATAI 3 RS LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS RB FT LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,497,181.95
  LT 230 kV ATLANTIDA 2 /OSORIO 2 RS LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS RB FT LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 670,435.57
  LT 230 kV BIGUACU /DESTERRO SC LT 230 kV BIGUACU /DESTERRO C-1 SC RB FT LT 230 kV BIGUACU /DESTERRO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 845,667.91
  LT 230 kV BIGUACU /GASPAR 2 SC LT 230 kV BIGUACU /GASPAR 2 C-1 SC RB FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 841,196.09
  LT 230 kV BIGUACU /GASPAR 2 SC LT 230 kV BIGUACU /GASPAR 2 C-1 SC RB FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,575,351.68
  LT 230 kV BIGUACU /GASPAR 2 SC LT 230 kV BIGUACU /GASPAR 2 C-1 SC RB FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC 057/2001 IPCA RBNI REA 7009/2018 7/1/2018 22/01/2055 27,050.06
  LT 230 kV BIGUACU /J.LACERDA-B SC LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RMEL REA 7759/2019 5/7/2020 5/7/2051 234,734.37

 

31 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 


  LT 230 kV BIGUACU /J.LACERDA-B SC LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RMEL REN 643/2014 30/08/2014 29/08/2051 315,033.38
  LT 230 kV BIGUACU /J.LACERDA-B SC LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,033,537.89
  LT 230 kV BIGUACU /J.LACERDA-B SC LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,935,560.17
  LT 230 kV BIGUACU /PALHOCA ESU SC LT 230 kV BIGUACU /PALHOCA ESU C-1 SC RB FT LT 230 kV BIGUACU /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 379,913.49
  LT 230 kV BLUMENAU /ITAJAI SC LT 230 kV BLUMENAU /ITAJAI C-1 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 442,985.38
  LT 230 kV BLUMENAU /ITAJAI SC LT 230 kV BLUMENAU /ITAJAI C-2 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 442,985.38
  LT 230 kV BLUMENAU /JOINV.NORTE SC LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 581,414.95
  LT 230 kV BLUMENAU /JOINV.NORTE SC LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,088,846.01
  LT 230 kV BLUMENAU /JOINVILLE SC LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,001,409.51
  LT 230 kV BLUMENAU /JOINVILLE SC LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 534,726.17
  LT 230 kV C.I.AUT.GRA /GRAVATAI 3 RS LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS RB FT LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,026.49
  LT 230 kV C.MOURAO /APUCARANA PR LT 230 kV C.MOURAO /APUCARANA C-1 PR RB FT LT 230 kV C.MOURAO /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 913,823.08
  LT 230 kV C.MOURAO /APUCARANA PR LT 230 kV C.MOURAO /APUCARANA C-1 PR RB FT LT 230 kV C.MOURAO /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,711,364.01
  LT 230 kV C.MOURAO /MARINGA PR LT 230 kV C.MOURAO /MARINGA C-1 PR RB FT LT 230 kV C.MOURAO /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,194,218.21
  LT 230 kV C.MOURAO /MARINGA PR LT 230 kV C.MOURAO /MARINGA C-1 PR RB FT LT 230 kV C.MOURAO /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 637,680.91
  LT 230 kV C.MOURAO /S. OSORIO PR LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,446,154.95
  LT 230 kV C.MOURAO /S. OSORIO PR LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,708,289.60
  LT 230 kV C.MOURAO /S. OSORIO PR LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,709,784.24
  LT 230 kV C.MOURAO /S. OSORIO PR LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,446,953.05
  LT 230 kV CAMAQUA 3 /NOVA STA RITA RS LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS RB FT LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS 004/2012 IPCA RBL CC 004/2012 12/9/2014 5/10/2042 6,739,874.96
  LT 230 kV CAMAQUA 3 /POVO NOVO RS LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS RB FT LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS 004/2012 IPCA RBL CC 004/2012 12/9/2014 5/10/2042 7,099,793.69
  LT 230 kV CANOINHAS ESU /S.MATEUS SUL SC/PR LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR RB FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 712,943.79
  LT 230 kV CANOINHAS ESU /S.MATEUS SUL SC/PR LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR RB FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 893,267.02
  LT 230 kV CANOINHAS ESU /S.MATEUS SUL SC/PR LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR RB FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 380,693.11
  LT 230 kV CAXIAS /CAXIAS SUL 5 RS LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 369,759.25
  LT 230 kV CURITIBA /JOINV.NORTE PR/SC LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 769,047.96
  LT 230 kV CURITIBA /JOINV.NORTE PR/SC LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,440,236.12
  LT 230 kV CURITIBA /JOINVILLE PR/SC LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,490,157.14
  LT 230 kV CURITIBA /JOINVILLE PR/SC LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 795,704.46
  LT 230 kV CURITIBA /S.MATEUS SUL PR LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 931,381.25
  LT 230 kV CURITIBA /S.MATEUS SUL PR LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,185,414.28
  LT 230 kV CURITIBA /S.MATEUS SUL PR LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,744,246.12
  LT 230 kV DOURADOS /GUAIRA MS/PR LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,385,362.00
  LT 230 kV DOURADOS /GUAIRA MS/PR LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,241,613.83
  LT 230 kV DOURADOS /GUAIRA MS/PR LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,807,693.69
  LT 230 kV FARROUPILHA /CAXIAS SUL 5 RS LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 294,294.82
  LT 230 kV FARROUPILHA /MONTE CLARO RS LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 462,740.87
  LT 230 kV FARROUPILHA /MONTE CLARO RS LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RMEL REA 7759/2019 3/9/2020 3/9/2051 131,729.43
  LT 230 kV FARROUPILHA /MONTE CLARO RS LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 463,338.73
  LT 230 kV FORQUILHINHA /L.GRANDE SC/RS LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS RB FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS 057/2001 IPCA RMEL REN 643/2014 21/03/2016 20/03/2044 9,749.79
  LT 230 kV FORQUILHINHA /L.GRANDE SC/RS LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS RB FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 204,855.31
  LT 230 kV FORQUILHINHA /SIDEROPOL.ESU SC LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 204,855.31
  LT 230 kV FOZ DO CHAPECO /GUARITA RS LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS RB FT LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS 002/2011 IPCA RBNI REA 6427/2017 7/1/2017 27/10/2045 633,000.26
  LT 230 kV FOZ DO CHAPECO /PINHALZINHO RS/SC LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 1,623,625.03
  LT 230 kV FOZ DO CHAPECO /PINHALZINHO RS/SC LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 1,623,625.03
  LT 230 kV FOZ DO CHAPECO /XANXERE ESU RS/SC LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC 002/2011 IPCA RBNI REA 6454/2017 7/1/2017 15/06/2052 882,587.38
  LT 230 kV FOZ DO CHAPECO /XANXERE ESU RS/SC LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC 002/2011 IPCA RBNI REA 6454/2017 7/1/2017 15/06/2052 882,587.38
  LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 164,410.52
  LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 87,790.86
  LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RBNI REA 7009/2018 7/1/2018 22/01/2055 27,050.06
  LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBNI REA 4802/2014 30/09/2016 29/09/2064 541,656.53
  LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 194,452.80
  LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 103,832.65
  LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 243,635.30
  LT 230 kV GASPAR 2 /PALHOCA ESU SC LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBNI REA 4802/2014 30/09/2016 29/09/2044 571,984.41
  LT 230 kV GASPAR 2 /PALHOCA ESU SC LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,263,879.45
  LT 230 kV GASPAR 2 /PALHOCA ESU SC LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 964,821.59
  LT 230 kV GASPAR 2 /PALHOCA ESU SC LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,806,871.58
  LT 230 kV GRAVATAI 2 /GRAVATAI 3 RS LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS RB FT LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 41,580.91
  LT 230 kV J.LACERDA-A /J.LACERDA-B SC LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,269.10
  LT 230 kV J.LACERDA-A /J.LACERDA-B SC LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 6,551.38
  LT 230 kV J.LACERDA-A /J.LACERDA-B SC LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,269.10
  LT 230 kV J.LACERDA-B /PALHOCA ESU SC LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,802,537.12
  LT 230 kV J.LACERDA-B /PALHOCA ESU SC LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 962,507.10
  LT 230 kV J.LACERDA-B /PALHOCA ESU SC LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC 057/2001 IPCA RMEL REA 7759/2019 12/4/2019 12/4/2050 47,895.61
  LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 738,352.68
  LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 394,260.79
  LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 377,500.71
  LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 706,965.22
  LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 7,711.60
  LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 9,784.90
  LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 4,152.93
  LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 4,152.93
  LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 9,784.90
  LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 7,711.60
  LT 230 kV JOINVILLE /JOINV.NORTE SC LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,521.10
  LT 230 kV JOINVILLE /JOINV.NORTE SC LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 50,471.77
  LT 230 kV JOINVILLE /VEGA DO SUL SC LT 230 kV JOINVILLE /VEGA DO SUL C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 523,202.28
  LT 230 kV JOINVILLE /VEGA DO SUL SC LT 230 kV JOINVILLE /VEGA DO SUL C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 523,202.28
  LT 230 kV L.GRANDE /CAXIAS SUL 5 RS LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 980,484.53
  LT 230 kV LONDRINA ESU /APUCARANA PR LT 230 kV LONDRINA ESU /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA ESU /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 603,834.99
  LT 230 kV LONDRINA ESU /APUCARANA PR LT 230 kV LONDRINA ESU /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA ESU /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 322,431.90
  LT 230 kV LONDRINA ESU /APUCARANA PR LT 230 kV LONDRINA ESU /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA ESU /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 756,561.58
  LT 230 kV LONDRINA ESU /ASSIS PR/SP LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP RB FT LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,339,113.26
  LT 230 kV LONDRINA ESU /ASSIS PR/SP LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP RB FT LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,930,739.80
  LT 230 kV LONDRINA ESU /ASSIS PR/SP LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP RB FT LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,249,024.56
  LT 230 kV LONDRINA ESU /ASSIS PR/SP LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP RB FT LT 230 kV LONDRINA ESU /ASSIS C-1 PR/SP 057/2001 IPCA RMEL REA 7759/2019 27/05/2019 27/05/2050 97,677.74
  LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 591,765.99
  LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 252,199.21
  LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 472,306.57
  LT 230 kV LONDRINA ESU /MARINGA PR LT 230 kV LONDRINA ESU /MARINGA C-1 PR RB FT LT 230 kV LONDRINA ESU /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,424,392.93
  LT 230 kV LONDRINA ESU /MARINGA PR LT 230 kV LONDRINA ESU /MARINGA C-1 PR RB FT LT 230 kV LONDRINA ESU /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 760,588.12
  LT 230 kV MACAMBARA /SANTO ANGELO RS LT 230 kV MACAMBARA /SANTO ANGELO C-1 RS RB FT LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS 007/2014 IPCA RBL CC 007/2014 12/6/2019 29/01/2044 7,407,096.43
  LT 230 kV MONTE CLARO /GARIBALDI 1 RS LT 230 kV MONTE CLARO /GARIBALDI 1 C-1 RS RB FT LT 230 kV MONTE CLARO /GARIBALDI 1 C-1 RS 012/2010 IPCA RBL CC 012/2010 19/07/2013 10/6/2040 2,834,882.35
  LT 230 kV MONTE CLARO /NOVA PRATA 2 RS LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 461,844.09
  LT 230 kV MONTE CLARO /NOVA PRATA 2 RS LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2049 1,039,699.13
  LT 230 kV MONTE CLARO /NOVA PRATA 2 RS LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 366,202.82
  LT 230 kV PASSO FUNDO /NOVA PRATA 2 RS LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,589,014.63
  LT 230 kV PASSO FUNDO /NOVA PRATA 2 RS LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,728,500.28
  LT 230 kV PASSO FUNDO /NOVA PRATA 2 RS LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,975,830.35
  LT 230 kV PASSO FUNDO /NOVA PRATA 2 RS LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2050 1,035,949.81
  LT 230 kV PASSO FUNDO /NOVA PRATA 2 RS LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,794,963.02
  LT 230 kV PASSO FUNDO /XANXERE ESU RS/SC LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,185,250.36
  LT 230 kV PASSO FUNDO /XANXERE ESU RS/SC LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,183,755.72
  LT 230 kV PASSO FUNDO /XANXERE ESU RS/SC LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 632,094.22
  LT 230 kV PATO BRANCO /XANXERE ESU PR/SC LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,189,734.28
  LT 230 kV PATO BRANCO /XANXERE ESU PR/SC LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 635,286.61
  LT 230 kV POVO NOVO /QUINTA RS LT 230 kV POVO NOVO /QUINTA C-1 RS RB FT LT 230 kV POVO NOVO /QUINTA C-1 RS 004/2012 IPCA RBL CC 004/2012 12/9/2014 5/10/2042 747,346.70
  LT 230 kV PRE.MEDICI /SANTA CRUZ 1 RS LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038 6,211,653.21
  LT 230 kV S. OSORIO /PATO BRANCO PR LT 230 kV S. OSORIO /PATO BRANCO C-1 PR RB FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,283,896.67

 

32 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 


  LT 230 kV S. OSORIO /PATO BRANCO PR LT 230 kV S. OSORIO /PATO BRANCO C-1 PR RB FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 685,566.83
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-1 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 5,706.58
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-2 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 5,706.58
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-3 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 5,860.81
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-3 PR DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 3,156.23
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-4 PR DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 3,156.23
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-4 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 5,860.81
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-5 PR DIT   057/2001 IPCA RCDM REA 4347/2013 5/6/2019 5/5/2049 47,109.16
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-5 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 6,015.05
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-5 PR DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 3,239.29
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-6 PR DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 3,239.29
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-6 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 6,015.05
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-6 PR DIT   057/2001 IPCA RCDM REA 4347/2013 5/6/2019 5/5/2049 47,109.16
  LT 230 kV S. OSORIO /XANXERE ESU PR/SC LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,421,318.52
  LT 500 kV ABDON BATISTA /C.NOVOS SC LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 3/4/2035 13,581,081.03
  LT 500 kV ABDON BATISTA /C.NOVOS SC LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBNI REA 5904/2016 7/1/2016 30/06/2044 55,083.16
  LT 500 kV ABDON BATISTA /C.NOVOS SC LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 25/05/2048 5,387.80
  LT 500 kV ABDON BATISTA /C.NOVOS SC LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 25/05/2048 140,491.14
  LT 500 kV AREIA /BATEIAS PR LT 500 kV AREIA /BATEIAS C-1 PR RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,037,331.02
  LT 500 kV AREIA /BATEIAS PR LT 500 kV AREIA /BATEIAS C-1 PR RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 4,291,722.00
  LT 500 kV AREIA /BATEIAS PR LT 500 kV AREIA /BATEIAS C-1 PR RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 10,070,194.67
  LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-1 PR DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 253,702.28
  LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-1 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 471,100.94
  LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 258,444.38
  LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 608,931.67
  LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 479,906.57
  LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RMEL REA 7759/2019 27/05/2019 27/05/2050 20,426.88
  LT 500 kV AREIA /C.NOVOS PR/SC LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,432,053.83
  LT 500 kV AREIA /C.NOVOS PR/SC LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,434,546.47
  LT 500 kV AREIA /C.NOVOS PR/SC LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 8,058,898.42
  LT 500 kV AREIA /CURITIBA PR LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 4,594,071.18
  LT 500 kV AREIA /CURITIBA PR LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,603,556.06
  LT 500 kV AREIA /IVAIPORA PR LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,318,954.75
  LT 500 kV AREIA /IVAIPORA PR LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,374,154.56
  LT 500 kV AREIA /IVAIPORA PR LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 7,917,193.45
  LT 500 kV AREIA /SEGREDO PR LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,642,111.90
  LT 500 kV AREIA /SEGREDO PR LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,126,016.94
  LT 500 kV AREIA /SEGREDO PR LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,108,750.49
  LT 500 kV BIGUACU /ABDON BATISTA SC LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 3/4/2035 77,887,499.63
  LT 500 kV BIGUACU /ABDON BATISTA SC LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 25/05/2048 805,716.65
  LT 500 kV BIGUACU /ABDON BATISTA SC LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 25/05/2048 30,899.04
  LT 500 kV BIGUACU /ABDON BATISTA SC LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBNI REA 5904/2016 7/1/2016 30/06/2044 56,018.34
  LT 500 kV BIGUACU /BLUMENAU SC LT 500 kV BIGUACU /BLUMENAU C-1 SC RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 25/05/2048 946,207.82
  LT 500 kV BIGUACU /BLUMENAU SC LT 500 kV BIGUACU /BLUMENAU C-1 SC RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 25/05/2048 36,286.84
  LT 500 kV BIGUACU /BLUMENAU SC LT 500 kV BIGUACU /BLUMENAU C-1 SC RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 3/4/2035 29,473,209.31
  LT 500 kV BLUMENAU /CURITIBA SC/PR LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,950,820.79
  LT 500 kV BLUMENAU /CURITIBA SC/PR LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,643,607.24
  LT 500 kV BLUMENAU /CURITIBA SC/PR LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,203,020.51
  LT 500 kV C.NOVOS /CAXIAS SC/RS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,417,110.29
  LT 500 kV C.NOVOS /CAXIAS SC/RS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,960,540.54
  LT 500 kV C.NOVOS /CAXIAS SC/RS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 9,293,102.94
  LT 500 kV C.NOVOS /MACHADINHO SC LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,300,191.54
  LT 500 kV C.NOVOS /MACHADINHO SC LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 980,297.10
  LT 500 kV C.NOVOS /MACHADINHO SC LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,835,853.37
  LT 500 kV CASCAVEL OEST /IVAIPORA PR LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034 32,271,823.61
  LT 500 kV CAXIAS /ITA RS/SC LT 500 kV CAXIAS /ITA C-1 RS/SC RB FT LT 500 kV CAXIAS /ITA C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,339,794.56
  LT 500 kV CURITIBA /BATEIAS PR LT 500 kV CURITIBA /BATEIAS C-1 PR RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,222,199.68
  LT 500 kV CURITIBA /BATEIAS PR LT 500 kV CURITIBA /BATEIAS C-1 PR RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,531,327.83
  LT 500 kV CURITIBA /BATEIAS PR LT 500 kV CURITIBA /BATEIAS C-1 PR RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 652,622.27
  LT 500 kV ITA /MACHADINHO SC LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,885,850.58
  LT 500 kV ITA /MACHADINHO SC LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,540,967.82
  LT 500 kV ITA /MACHADINHO SC LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,615,762.14
  LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 37,468.63
  LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 20,007.26
  LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 46,945.48
  LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 45,162.74
  LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 19,247.49
  LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 36,045.77
  LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-3 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-3 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 36,045.77
  LT 500 kV IVAIPORA /LONDRINA ESU PR LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,447,347.49
  LT 500 kV IVAIPORA /LONDRINA ESU PR LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,374,765.83
  LT 500 kV IVAIPORA /LONDRINA ESU PR LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,572,204.86
  LT 500 kV IVAIPORA /S.SANTIAGO PR LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,039,855.42
  LT 500 kV IVAIPORA /S.SANTIAGO PR LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 7,567,502.17
  LT 500 kV IVAIPORA /S.SANTIAGO PR LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,225,122.91
  LT 500 kV IVAIPORA /S.SANTIAGO PR LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034 29,500,454.07
  LT 500 kV S.SANTIAGO /ITA PR/SC LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 8,538,866.84
  LT 500 kV S.SANTIAGO /ITA PR/SC LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,639,099.72
  LT 500 kV S.SANTIAGO /ITA PR/SC LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,815,131.34
  LT 500 kV S.SANTIAGO /ITA PR/SC LT 500 kV S.SANTIAGO /ITA C-2 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC 004/2012 IPCA RBL CC 004/2012 2/4/2014 5/10/2042 17,288,661.53
  LT 500 kV S.SANTIAGO /SEGREDO PR LT 500 kV S.SANTIAGO /SEGREDO C-1 PR RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,221,849.56
  LT 500 kV S.SANTIAGO /SEGREDO PR LT 500 kV S.SANTIAGO /SEGREDO C-1 PR RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,186,408.85
  LT 500 kV S.SANTIAGO /SEGREDO PR LT 500 kV S.SANTIAGO /SEGREDO C-1 PR RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,783,816.87
  LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-1 PR DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 16,182.41
  LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-1 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,049.20
  LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-2 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,480.11
  LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-2 PR DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 16,953.00
  LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-2 PR DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 39,943.68
  LT 525 kV C.NOVOS /NOVA STA RITA SC/RS LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 39,767,417.53
  LT 525 kV CAXIAS /GRAVATAI RS LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,871,257.15
  LT 525 kV CAXIAS /GRAVATAI RS LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,597,477.63
  LT 525 kV CAXIAS /GRAVATAI RS LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,533,175.31
  LT 525 kV GRAVATAI /NOVA STA RITA RS LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,165,029.92
  LT 525 kV GRAVATAI /NOVA STA RITA RS LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,459,698.26
  LT 525 kV GRAVATAI /NOVA STA RITA RS LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 622,095.14
  LT 525 kV ITA /NOVA STA RITA SC/RS LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 14,389,910.50
  LT 525 kV ITA /NOVA STA RITA SC/RS LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 6,132,701.25
  LT 525 kV ITA /NOVA STA RITA SC/RS LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 11,485,028.62
  LT 525 kV ITA /NOVA STA RITA SC/RS LT 525 kV ITA /NOVA STA RITA C-2 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBL CC 004/2012 8/6/2014 5/10/2042 27,752,852.36
  MACAMBARA IB 230 kV LT 230 kV MACAMBARA /SANTO ANGELO C-1 RS RB FT LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS 007/2014 IPCA RBL CC 007/2014 12/6/2019 29/01/2044 531,625.28
  MACAMBARA IB 230 kV RTL 230 kV 0 Mvar MACAMBARA RT2 RS RB FT LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS 007/2014 IPCA RBL CC 007/2014 12/6/2019 29/01/2044 153,613.19
  MACAMBARA RTL 230 kV 0 Mvar MACAMBARA RT2 RS RB FT LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS 007/2014 IPCA RBL CC 007/2014 12/6/2019 29/01/2044 377,006.10
  MACHADINHO MG 500 kV MACHADINHO MG1 SC RB FT MG 500 kV MACHADINHO MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 660,627.27
  MARINGA EL 230 kV MARINGA LT 230 kV LONDRINA ESU /MARINGA C-1 PR RB FT LT 230 kV LONDRINA ESU /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  MARINGA EL 230 kV MARINGA LT 230 kV LONDRINA ESU /MARINGA C-1 PR RB FT LT 230 kV LONDRINA ESU /MARINGA C-1 PR 057/2001 IPCA RMEL REN 643/2014 31/12/2016 30/12/2045 996.24
  MISSOES EL 69 kV MISSOES  DIST1 DIT   005/2009 IPCA RPEC CC 005/2009 19/06/2010 28/01/2039 39,340.82
  MISSOES IB 230 kV MG 230 kV MISSOES MG1 RS IB1 RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 236,384.63
  MISSOES IB 69 kV MG 230 kV MISSOES MG1 RS IB1 DIT   005/2009 IPCA RPEC CC 005/2009 19/06/2010 28/01/2039 46,788.79
  MISSOES MC 230 kV TR 230/69 kV MISSOES TR1 RS RBF FT TR 230/69 kV MISSOES TR1 RS 005/2009 IPCA RBL CC 005/2009 28/01/2009 28/01/2039 193,876.86
  MISSOES MC 230 kV TR 230/69 kV MISSOES TR1 RS RBF FT TR 230/69 kV MISSOES TR1 RS 005/2009 IPCA RMEL REN 643/2014 25/11/2015 24/11/2047 386.92

 

33 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 


  MISSOES MC 230 kV TR 230/69 kV MISSOES TR2 RS RBF FT TR 230/69 kV MISSOES TR2 RS 005/2009 IPCA RMEL REN 643/2014 25/11/2015 24/11/2047 386.92
  MISSOES MC 230 kV TR 230/69 kV MISSOES TR2 RS RBF FT TR 230/69 kV MISSOES TR2 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 427,500.82
  MISSOES MC 230 kV TR 230/69 kV MISSOES TR3 RS RBF FT TR 230/69 kV MISSOES TR3 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 427,500.82
  MISSOES MC 230 kV TR 230/69 kV MISSOES TR3 RS RBF FT TR 230/69 kV MISSOES TR3 RS 005/2009 IPCA RMEL REN 643/2014 25/11/2015 24/11/2047 386.92
  MISSOES MC 69 kV TR 230/69 kV MISSOES TR1 RS RBF FT TR 230/69 kV MISSOES TR1 RS 005/2009 IPCA RBL CC 005/2009 28/01/2009 28/01/2039 77,235.49
  MISSOES MC 69 kV TR 230/69 kV MISSOES TR2 RS RBF FT TR 230/69 kV MISSOES TR2 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 78,130.45
  MISSOES MC 69 kV TR 230/69 kV MISSOES TR3 RS RBF FT TR 230/69 kV MISSOES TR3 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 78,130.45
  MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 2,690,210.11
  MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RBL CC 005/2009 28/01/2009 28/01/2039 118,390.21
  MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RBNI REA 5861/2016 5/10/2019 5/9/2036 22,839.23
  MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RMEL REN 643/2014 25/11/2015 24/11/2047 386.92
  MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RMEL REN 643/2014 25/11/2015 24/11/2047 386.92
  MISSOES TR 230/69 kV MISSOES TR1 RS RBF FT TR 230/69 kV MISSOES TR1 RS 005/2009 IPCA RBL CC 005/2009 28/01/2009 28/01/2039 641,103.22
  MISSOES TR 230/69 kV MISSOES TR2 RS RBF FT TR 230/69 kV MISSOES TR2 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 422,348.11
  MISSOES TR 230/69 kV MISSOES TR3 RS RBF FT TR 230/69 kV MISSOES TR3 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 422,348.11
  MONTE CLARO EL 230 kV MONTE CLARO LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  MONTE CLARO EL 230 kV MONTE CLARO LT 230 kV MONTE CLARO /GARIBALDI 1 C-1 RS RB FT LT 230 kV MONTE CLARO /GARIBALDI 1 C-1 RS 012/2010 IPCA RBL CC 012/2010 19/07/2013 10/6/2040 679,112.07
  MONTE CLARO EL 230 kV MONTE CLARO LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  MONTE CLARO EL 230 kV MONTE CLARO LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2043 24,764.07
  MONTE CLARO IB 230 kV MG 230 kV MONTE CLARO MG1 RS IB1 RB FT MG 230 kV MONTE CLARO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,853.32
  N. PETROPOLIS 2 EL 69 kV N. PETROPOLIS 2  DIST1 DIT   011/2010 IPCA RPEC CC 011/2010 10/6/2010 10/6/2040 118,407.47
  N. PETROPOLIS 2 EL 69 kV N. PETROPOLIS 2  DIST2 DIT   011/2010 IPCA RPEC CC 011/2010 10/6/2010 10/6/2040 118,407.47
  N. PETROPOLIS 2 IB 230 kV MG 230 kV N. PETROPOLIS 2 MG1 RS IB1 RB FT MG 230 kV N. PETROPOLIS 2 MG1 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 282,321.16
  N. PETROPOLIS 2 IB 69 kV MG 230 kV N. PETROPOLIS 2 MG1 RS IB1 DIT   011/2010 IPCA RPEC CC 011/2010 10/6/2010 10/6/2040 67,670.38
  N. PETROPOLIS 2 MC 230 kV TR 230/69 kV N. PETROPOLIS 2 TR1 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 382,443.02
  N. PETROPOLIS 2 MC 230 kV TR 230/69 kV N. PETROPOLIS 2 TR2 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR2 RS 011/2010 IPCA RBNI REA 6042/2016 22/09/2018 22/09/2041 919,663.60
  N. PETROPOLIS 2 MC 69 kV TR 230/69 kV N. PETROPOLIS 2 TR1 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 152,098.81
  N. PETROPOLIS 2 MC 69 kV TR 230/69 kV N. PETROPOLIS 2 TR2 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR2 RS 011/2010 IPCA RBNI REA 6042/2016 22/09/2018 22/09/2040 349,956.17
  N. PETROPOLIS 2 MG 230 kV N. PETROPOLIS 2 MG1 RS RB FT MG 230 kV N. PETROPOLIS 2 MG1 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 1,135,042.88
  N. PETROPOLIS 2 MG 230 kV N. PETROPOLIS 2 MG1 RS RB FT MG 230 kV N. PETROPOLIS 2 MG1 RS 011/2010 IPCA RBNI REA 6042/2016 22/09/2018 22/09/2049 165,984.41
  N. PETROPOLIS 2 TR 230/69 kV N. PETROPOLIS 2 TR1 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 10/6/2010 10/6/2040 940,229.60
  N. PETROPOLIS 2 TR 230/69 kV N. PETROPOLIS 2 TR2 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR2 RS 011/2010 IPCA RBNI REA 6042/2016 22/09/2018 22/09/2052 1,203,037.55
  NOVA ANDRADINA EL 138 kV NOVA ANDRADINA LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2046 652,992.52
  NOVA ANDRADINA EL 138 kV NOVA ANDRADINA LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA C-1 MS/SP DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2045 669,281.88
  NOVA ANDRADINA MG 138 kV NOVA ANDRADINA MG1 MS DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2042 267,127.67
  NOVA PRATA 2 EL 230 kV NOVA PRATA 2 LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2045 1,016,814.79
  NOVA PRATA 2 EL 230 kV NOVA PRATA 2 LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2045 1,016,814.79
  NOVA PRATA 2 MG 230 kV NOVA PRATA 2 MG2 RS RB FT MG 230 kV NOVA PRATA 2 MG2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2041 209,307.56
  NOVA STA RITA EL 230 kV NOVA STA RITA LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS RB FT LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS 004/2012 IPCA RBL CC 004/2012 12/9/2014 5/10/2042 412,633.17
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 9,651.45
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RMEL REN 443/2011 30/08/2015 29/08/2042 516.57
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 1,694,245.22
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2043 358.69
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RMEL REN 443/2011 10/8/2016 10/7/2043 439.05
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBL CC 004/2012 8/6/2014 5/10/2042 901,673.32
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBNI REA 5861/2016 26/04/2020 25/04/2035 11,621.35
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBNI REA 8314/2019 26/04/2020 25/04/2035 11,621.35
  NOVA STA RITA IB 230 kV MG 525 kV NOVA STA RITA MG1 RS IB5 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB1 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB2 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB3 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB4 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB6 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBNI REA 3339/2012 22/12/2013 21/12/2044 1,316,392.19
  NOVA STA RITA MC 230 kV TR 525/230 kV NOVA STA RITA TR1 RS RB FT TR 525/230 kV NOVA STA RITA TR1 RS 057/2001 IPCA RBNI REA 3339/2012 22/12/2013 21/12/2043 876,255.83
  NOVA STA RITA MC 230 kV TR 525/230 kV NOVA STA RITA TR2 RS RB FT TR 525/230 kV NOVA STA RITA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  NOVA STA RITA MC 230 kV TR 525/230 kV NOVA STA RITA TR3 RS RB FT TR 525/230 kV NOVA STA RITA TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  NOVA STA RITA MC 230 kV TR 525/230 kV NOVA STA RITA TR4 RS RB FT TR 525/230 kV NOVA STA RITA TR4 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  NOVA STA RITA MC 525 kV RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 1,383,658.84
  NOVA STA RITA MC 525 kV RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 205,632.32
  NOVA STA RITA MC 525 kV RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS 004/2012 IPCA RBL CC 004/2012 8/6/2014 5/10/2042 482,331.18
  NOVA STA RITA MC 525 kV TR 525/230 kV NOVA STA RITA TR1 RS RB FT TR 525/230 kV NOVA STA RITA TR1 RS 057/2001 IPCA RBNI REA 3339/2012 22/12/2013 21/12/2044 1,407,118.96
  NOVA STA RITA MC 525 kV TR 525/230 kV NOVA STA RITA TR2 RS RB FT TR 525/230 kV NOVA STA RITA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  NOVA STA RITA MC 525 kV TR 525/230 kV NOVA STA RITA TR3 RS RB FT TR 525/230 kV NOVA STA RITA TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  NOVA STA RITA MC 525 kV TR 525/230 kV NOVA STA RITA TR4 RS RB FT TR 525/230 kV NOVA STA RITA TR4 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  NOVA STA RITA MG 525 kV NOVA STA RITA MG1 RS RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RMEL REN 643/2014 10/5/2014 10/4/2031 22,162.32
  NOVA STA RITA MG 525 kV NOVA STA RITA MG1 RS RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RMEL REN 643/2014 15/06/2014 14/06/2031 22,109.98
  NOVA STA RITA MG 525 kV NOVA STA RITA MG1 RS RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,404.16
  NOVA STA RITA MG 525 kV NOVA STA RITA MG1 RS RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,416,952.30
  NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS 005/2006 IPCA RMEL REN 443/2011 14/06/2017 13/06/2053 618.11
  NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 2,108,351.24
  NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS 057/2001 IPCA RMEL REN 443/2011 29/10/2015 28/10/2051 68.49
  NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 633,727.45
  NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS 004/2012 IPCA RBL CC 004/2012 8/6/2014 5/10/2042 1,493,610.15
  NOVA STA RITA RTL 525 kV 50 Mvar NOVA STA RITA RTR2 RS RB FT RTL 525 kV 50 Mvar NOVA STA RITA RTR2 RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 702,782.91
  NOVA STA RITA RTL 525 kV 50 Mvar NOVA STA RITA RTR3 RS RB FT RTL 525 kV 50 Mvar NOVA STA RITA RTR3 RS 004/2012 IPCA RBL CC 004/2012 8/6/2014 5/10/2042 497,870.47
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR1 RS RB FT TR 525/230 kV NOVA STA RITA TR1 RS 057/2001 IPCA RMEL REN 443/2011 9/3/2015 9/2/2050 7.83
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR1 RS RB FT TR 525/230 kV NOVA STA RITA TR1 RS 057/2001 IPCA RBNI REA 3339/2012 22/12/2013 21/12/2048 4,575,131.82
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR2 RS RB FT TR 525/230 kV NOVA STA RITA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR2 RS RB FT TR 525/230 kV NOVA STA RITA TR2 RS 057/2001 IPCA RMEL REN 443/2011 16/06/2017 15/06/2052 170.51
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR3 RS RB FT TR 525/230 kV NOVA STA RITA TR3 RS 057/2001 IPCA RMEL REN 443/2011 6/5/2016 6/4/2051 205.47
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR3 RS RB FT TR 525/230 kV NOVA STA RITA TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR4 RS RB FT TR 525/230 kV NOVA STA RITA TR4 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR4 RS RB FT TR 525/230 kV NOVA STA RITA TR4 RS 057/2001 IPCA RMEL REN 443/2011 29/07/2015 28/07/2050 162.83
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TRR1 RS RB FT TR 525/230 kV NOVA STA RITA TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 528,105.26
  OSORIO 2 EL 230 kV OSORIO 2 LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS RB FT LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  OSORIO 2 MG 230 kV OSORIO 2 MG2 RS RB FT MG 230 kV OSORIO 2 MG2 RS 057/2001 IPCA RBNI REA 5861/2016 5/7/2019 5/6/2036 22,507.55
  OSORIO 2 MG 230 kV OSORIO 2 MG2 RS RB FT MG 230 kV OSORIO 2 MG2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 281,249.81
  PAL.PINHEIRA EL 138 kV PAL.PINHEIRA LT 138 kV IMBITUBA /PAL.PINHEIRA C-1 SC DIT   057/2001 IPCA RCDM REA 2879/2011 2/6/2016 2/5/2046 755,999.85
  PAL.PINHEIRA EL 138 kV PAL.PINHEIRA LT 138 kV PAL.PINHEIRA /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RCDM REA 2879/2011 2/6/2016 2/5/2046 755,999.85
  PALHOCA ESU BC 230 kV 50 Mvar PALHOCA ESU BC1 SC RB FT BC 230 kV 50 Mvar PALHOCA ESU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 156,253.58
  PALHOCA ESU EL 138 kV PALHOCA ESU  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  PALHOCA ESU EL 138 kV PALHOCA ESU  SJS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RMEL REN 643/2014 28/08/2013 27/08/2036 9,939.72
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV ILHA CENTRO /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV ILHA CENTRO /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 74,313.22
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV PAL.PINHEIRA /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV PAL.PINHEIRA /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RCDM REA 2879/2011 2/6/2016 2/5/2044 25,303.40
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV PALHOCA CSC /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV PALHOCA ESU /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV TRINDADE (DIST) /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV TRINDADE (DIST) /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 74,313.22
  PALHOCA ESU EL 230 kV PALHOCA ESU LT 230 kV BIGUACU /PALHOCA ESU C-1 SC RB FT LT 230 kV BIGUACU /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  PALHOCA ESU EL 230 kV PALHOCA ESU LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RMEL REN 643/2014 10/9/2013 10/8/2036 17,718.80
  PALHOCA ESU EL 230 kV PALHOCA ESU LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36


34 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  PALHOCA ESU EL 230 kV PALHOCA ESU LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  PALHOCA ESU IB 138 kV MG 230 kV PALHOCA ESU MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 71,499.42
  PALHOCA ESU IB 230 kV MG 230 kV PALHOCA ESU MG1 SC IB1 RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 92,023.55
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNI REA 5484/2015 8/8/2017 8/7/2047 30,085.67
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNI REA 5484/2015 28/10/2015 27/10/2043 17,624.64
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNIA REA 7529/2018     50,852.84
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RMEL REN 643/2014 10/9/2013 10/8/2036 10,906.17
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 92,023.55
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBNI REA 5484/2015 8/8/2017 8/7/2047 30,085.67
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBNIA REA 7529/2018     61,686.99
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 92,023.55
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 49,138.14
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 115,298.85
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBNIA REA 7529/2018     97,138.18
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR4 SC RBF FT TR 230/138 kV PALHOCA ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 92,023.55
  PALHOCA ESU MC 230 kV BC 230 kV 50 Mvar PALHOCA ESU BC1 SC RB FT BC 230 kV 50 Mvar PALHOCA ESU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 142,709.63
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNI REA 5484/2015 28/10/2015 27/10/2043 17,559.66
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNIA REA 7529/2018     162,404.05
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 67,201.71
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBNIA REA 7529/2018     333,390.92
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 67,201.71
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 157,683.63
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBNIA REA 7529/2018     275,780.33
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR4 SC RBF FT TR 230/138 kV PALHOCA ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  PALHOCA ESU MG 230 kV PALHOCA ESU MG1 SC RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 4/11/2013 4/10/2030 9,531.86
  PALHOCA ESU MG 230 kV PALHOCA ESU MG1 SC RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 15/09/2014 14/09/2031 10,248.47
  PALHOCA ESU MG 230 kV PALHOCA ESU MG1 SC RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 549,096.30
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 280,641.25
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 149,855.00
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 351,623.20
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNIA REA 7529/2018     1,458,618.60
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,687.58
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 141,870.13
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 332,887.33
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBNIA REA 7529/2018     1,458,618.60
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,687.58
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 141,870.13
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 332,887.33
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBNIA REA 7529/2018     1,458,618.60
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR4 SC RBF FT TR 230/138 kV PALHOCA ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR4 SC RBF FT TR 230/138 kV PALHOCA ESU TR4 SC 057/2001 IPCA RBNIA REA 7529/2018     4,458.11
  PASSO FUNDO EL 138 kV PASSO FUNDO  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,544.49
  PASSO FUNDO EL 138 kV PASSO FUNDO  DIST1 DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 49,838.04
  PASSO FUNDO EL 138 kV PASSO FUNDO LT 138 kV EREXIM 1 /PASSO FUNDO C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,992.57
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /GUARITA C-1 RS RB FT LT 230 kV PASSO FUNDO /GUARITA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RMEL REN 643/2014 12/6/2014 12/5/2043 2,265.86
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 98,770.66
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2043 24,764.07
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /SANTA MARTA C-1 RS RB FT LT 230 kV PASSO FUNDO /SANTA MARTA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /U.PASSO FUNDO C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 186,020.07
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /U.PASSO FUNDO C-2 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 186,020.07
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  PASSO FUNDO IB 138 kV MG 230 kV PASSO FUNDO MG1 RS IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 71,499.42
  PASSO FUNDO IB 138 kV MG 230 kV PASSO FUNDO MG1 RS IB1 DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 38,504.63
  PASSO FUNDO IB 230 kV MG 230 kV PASSO FUNDO MG1 RS IB1 RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  PASSO FUNDO IB 230 kV MG 230 kV PASSO FUNDO MG1 RS IB1 RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 58,190.65
  PASSO FUNDO MC 138 kV TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 92,023.55
  PASSO FUNDO MC 138 kV TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 49,138.14
  PASSO FUNDO MC 138 kV TR 230/138 kV PASSO FUNDO TR5 RS RBF FT TR 230/138 kV PASSO FUNDO TR5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 92,023.55
  PASSO FUNDO MC 230 kV TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 132,627.80
  PASSO FUNDO MC 230 kV TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 70,819.73
  PASSO FUNDO MC 230 kV TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RMEL REN 643/2014 6/11/2014 6/10/2046 2,215.04
  PASSO FUNDO MC 230 kV TR 230/138 kV PASSO FUNDO TR5 RS RBF FT TR 230/138 kV PASSO FUNDO TR5 RS 057/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2046 219.07
  PASSO FUNDO MC 230 kV TR 230/138 kV PASSO FUNDO TR5 RS RBF FT TR 230/138 kV PASSO FUNDO TR5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 132,627.80
  PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 513,055.52
  PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 273,958.06
  PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RBNI REA 5861/2016 21/11/2018 20/11/2035 36,554.56
  PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RMEL REN 643/2014 23/12/2014 22/12/2031 20,768.76
  PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RMEL REN 643/2014 21/09/2015 20/09/2035 2,443.18
  PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RMEL REN 643/2014 15/09/2014 14/09/2034 2,342.32
  PASSO FUNDO TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 521,229.31
  PASSO FUNDO TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 416,009.09
  PASSO FUNDO TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 222,137.84
  PASSO FUNDO TR 230/138 kV PASSO FUNDO TR5 RS RBF FT TR 230/138 kV PASSO FUNDO TR5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 416,009.09
  PINHALZINHO EL 138 kV PINHALZINHO  DIST1 DIT   007/2014 IPCA RPEC CC 007/2014 28/02/2018 29/01/2044 292,046.67
  PINHALZINHO EL 138 kV PINHALZINHO  DIST2 DIT   007/2014 IPCA RPEC CC 007/2014 28/02/2018 29/01/2044 292,046.67
  PINHALZINHO EL 138 kV PINHALZINHO  DIST3 DIT   007/2014 IPCA RPEC CC 007/2014 28/02/2018 29/01/2044 292,046.67
  PINHALZINHO EL 138 kV PINHALZINHO  DIST4 DIT   007/2014 IPCA RPEC CC 007/2014 28/02/2018 29/01/2044 292,046.67
  PINHALZINHO EL 230 kV PINHALZINHO LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 364,513.55
  PINHALZINHO EL 230 kV PINHALZINHO LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 394,255.09
  PINHALZINHO IB 138 kV MG 230 kV PINHALZINHO MG1 SC IB1 DIT   007/2014 IPCA RPEC CC 007/2014 28/02/2018 29/01/2044 163,904.26
  PINHALZINHO IB 230 kV MG 230 kV PINHALZINHO MG1 SC IB1 RB FT MG 230 kV PINHALZINHO MG1 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 221,331.59
  PINHALZINHO MC 138 kV TR 230/138 kV PINHALZINHO TR1 SC RBF FT TR 230/138 kV PINHALZINHO TR1 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 197,248.11
  PINHALZINHO MC 138 kV TR 230/138 kV PINHALZINHO TR2 SC RBF FT TR 230/138 kV PINHALZINHO TR2 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 197,248.11
  PINHALZINHO MC 138 kV TR 230/138 kV PINHALZINHO TR3 SC RBF FT TR 230/138 kV PINHALZINHO TR3 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 197,248.11
  PINHALZINHO MC 230 kV TR 230/138 kV PINHALZINHO TR1 SC RBF FT TR 230/138 kV PINHALZINHO TR1 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 256,645.95
  PINHALZINHO MC 230 kV TR 230/138 kV PINHALZINHO TR2 SC RBF FT TR 230/138 kV PINHALZINHO TR2 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 256,645.94
  PINHALZINHO MC 230 kV TR 230/138 kV PINHALZINHO TR3 SC RBF FT TR 230/138 kV PINHALZINHO TR3 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 256,645.94
  PINHALZINHO MG 230 kV PINHALZINHO MG1 SC RB FT MG 230 kV PINHALZINHO MG1 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 1,580,148.27
  PINHALZINHO TR 230/138 kV PINHALZINHO TR1 SC RBF FT TR 230/138 kV PINHALZINHO TR1 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 709,267.08
  PINHALZINHO TR 230/138 kV PINHALZINHO TR2 SC RBF FT TR 230/138 kV PINHALZINHO TR2 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 709,267.07
  PINHALZINHO TR 230/138 kV PINHALZINHO TR3 SC RBF FT TR 230/138 kV PINHALZINHO TR3 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 709,267.07
  PRE.MEDICI EL 230 kV PRE.MEDICI LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038 299,026.84
  PRE.MEDICI MC 230 kV RTL 230 kV 10 Mvar PRE.MEDICI RT2 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038 71,425.10
  PRE.MEDICI RTL 230 kV 10 Mvar PRE.MEDICI RT2 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038 64,418.19
  QUINTA EL 230 kV QUINTA LT 230 kV POVO NOVO /QUINTA C-1 RS RB FT LT 230 kV POVO NOVO /QUINTA C-1 RS 004/2012 IPCA RBL CC 004/2012 12/9/2014 5/10/2042 412,633.17
  S. OSORIO EL 13,8 kV S. OSORIO  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 41,137.62
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 9/11/2014 9/10/2047 90,665.51
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 12/6/2014 12/5/2043 2,265.86
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 12/6/2014 12/5/2043 2,265.86
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 20/03/2014 19/03/2047 89,487.20

 

35 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 4/9/2014 4/8/2047 89,621.85
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 14/12/2014 13/12/2043 2,267.35
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 2/6/2013 2/5/2046 86,746.79
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 20/07/2014 19/07/2043 2,239.80
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV CASCAVEL /S. OSORIO C-1 PR RB FT LT 230 kV CASCAVEL /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 28/02/2013 27/02/2046 86,894.93
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV CASCAVEL /S. OSORIO C-1 PR RB FT LT 230 kV CASCAVEL /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 17/08/2014 16/08/2043 2,245.05
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV CASCAVEL /S. OSORIO C-1 PR RB FT LT 230 kV CASCAVEL /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR RB FT LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR RB FT LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 98,770.66
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR RB FT LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 231,757.73
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR RB FT LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 16/04/2014 15/04/2047 89,669.00
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR RB FT LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 23/11/2014 22/11/2043 2,263.43
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /PATO BRANCO C-1 PR RB FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR 057/2001 IPCA RMEL REN 643/2014 27/03/2014 26/03/2047 89,534.33
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /PATO BRANCO C-1 PR RB FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR 057/2001 IPCA RMEL REN 643/2014 14/12/2014 13/12/2043 2,267.35
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /PATO BRANCO C-1 PR RB FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,972.95
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 28/05/2014 27/05/2047 89,951.78
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 13/03/2016 3/12/2045 2,352.66
  S. OSORIO IB 230 kV MG 230 kV S. OSORIO MG1 PR IB1 RB FT MG 230 kV S. OSORIO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  S. OSORIO MC 230 kV TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 133,378.60
  S. OSORIO MC 230 kV TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RMEL REN 643/2014 7/10/2013 7/9/2036 17,553.29
  S. OSORIO MC 230 kV TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RMEL REN 643/2014 14/08/2014 13/08/2046 2,225.91
  S. OSORIO MC 230 kV TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RCDM REA 4347/2013 20/05/2015 19/05/2045 30,883.30
  S. OSORIO MC 69 kV TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RMEL REN 643/2014 27/08/2013 26/08/2036 5,600.98
  S. OSORIO MC 69 kV TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RMEL REN 643/2014 9/3/2013 9/2/2036 5,605.02
  S. OSORIO MC 69 kV TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,244.87
  S. OSORIO MG 230 kV S. OSORIO MG1 PR RB FT MG 230 kV S. OSORIO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 455,427.50
  S. OSORIO MG 230 kV S. OSORIO MG1 PR RB FT MG 230 kV S. OSORIO MG1 PR 057/2001 IPCA RMEL REN 643/2014 10/8/2013 10/7/2030 19,557.93
  S. OSORIO MG 230 kV S. OSORIO MG1 PR RB FT MG 230 kV S. OSORIO MG1 PR 057/2001 IPCA RMEL REN 643/2014 12/9/2014 12/8/2034 2,365.43
  S. OSORIO TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 152,327.53
  S. OSORIO TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 82,033.04
  S.SANTIAGO EL 13,8 kV S.SANTIAGO  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 41,137.62
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2045 2,250.65
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034 4,140,920.76
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 205,347.83
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 14/11/2013 13/11/2036 36,975.81
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 24/08/2014 23/08/2045 1,945.27
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /ITA C-2 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC 004/2012 IPCA RBL CC 004/2012 2/4/2014 5/10/2042 901,673.32
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /SEGREDO C-1 PR RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /SEGREDO C-1 PR RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 205,347.83
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /SEGREDO C-1 PR RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 481,832.85
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-1 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 386,742.58
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-2 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 386,742.58
  S.SANTIAGO IB 500 kV MG 500 kV S.SANTIAGO MG1 PR IB1 RB FT MG 500 kV S.SANTIAGO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  S.SANTIAGO IB 500 kV MG 500 kV S.SANTIAGO MG1 PR IB2 RB FT MG 500 kV S.SANTIAGO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  S.SANTIAGO IB 500 kV MG 500 kV S.SANTIAGO MG1 PR IB3 RB FT MG 500 kV S.SANTIAGO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  S.SANTIAGO IB 500 kV MG 500 kV S.SANTIAGO MG2 PR IB5 RB FT MG 500 kV S.SANTIAGO MG2 PR 004/2012 IPCA RBL CC 004/2012 2/4/2014 5/10/2042 854,401.63
  S.SANTIAGO MC 13,8 kV TR 69/13,8 kV S.SANTIAGO TR4 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,781.98
  S.SANTIAGO MC 69 kV TR 69/13,8 kV S.SANTIAGO TR4 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,244.87
  S.SANTIAGO MG 500 kV S.SANTIAGO MG1 PR RB FT MG 500 kV S.SANTIAGO MG1 PR 057/2001 IPCA RMEL REN 643/2014 10/11/2013 10/10/2030 9,574.01
  S.SANTIAGO MG 500 kV S.SANTIAGO MG1 PR RB FT MG 500 kV S.SANTIAGO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,174,719.40
  SANTA CRUZ 1 EL 230 kV SANTA CRUZ 1 LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBNI REA 5861/2016 24/05/2019 23/05/2036 34,219.85
  SANTA CRUZ 1 EL 230 kV SANTA CRUZ 1 LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038 267,856.99
  SANTA CRUZ 1 MC 230 kV RTL 230 kV 5 Mvar SANTA CRUZ 1 RT1 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038 71,425.10
  SANTA CRUZ 1 RTL 230 kV 5 Mvar SANTA CRUZ 1 RT1 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038 32,209.72
  SANTA MARIA 3 EL 138 kV SANTA MARIA 3  FORMIGUEIRO 2 DIT   007/2014 IPCA RPEC CC 007/2014 19/05/2016 29/01/2044 855,160.52
  SANTA MARIA 3 IB 138 kV MG 230 kV SANTA MARIA 3 MG2 RS IB1 DIT   007/2014 IPCA RPEC CC 007/2014 19/05/2016 29/01/2044 476,930.40
  SANTA MARIA 3 MC 138 kV TR 230/138 kV SANTA MARIA 3 TR3 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR3 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044 197,248.11
  SANTA MARIA 3 MC 138 kV TR 230/138 kV SANTA MARIA 3 TR4 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR4 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044 197,248.11
  SANTA MARIA 3 MC 230 kV TR 230/138 kV SANTA MARIA 3 TR3 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR3 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044 256,645.94
  SANTA MARIA 3 MC 230 kV TR 230/138 kV SANTA MARIA 3 TR4 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR4 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044 256,645.94
  SANTA MARIA 3 MG 230 kV SANTA MARIA 3 MG2 RS RB FT MG 230 kV SANTA MARIA 3 MG2 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044 1,048,756.19
  SANTA MARIA 3 TR 230/138 kV SANTA MARIA 3 TR3 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR3 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044 557,886.81
  SANTA MARIA 3 TR 230/138 kV SANTA MARIA 3 TR4 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR4 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044 557,886.81
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /MISSOES C-1 RS RB FT LT 230 kV SANTO ANGELO /MISSOES C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /MISSOES C-1 RS RB FT LT 230 kV SANTO ANGELO /MISSOES C-1 RS 057/2001 IPCA RMEL REN 643/2014 23/10/2013 22/10/2036 18,969.10
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /MISSOES C-1 RS RB FT LT 230 kV SANTO ANGELO /MISSOES C-1 RS 057/2001 IPCA RMEL REN 643/2014 22/11/2015 21/11/2044 709.77
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /SANTA ROSA 1 C-1 RS RB FT LT 230 kV SANTO ANGELO /SANTA ROSA 1 C-1 RS 057/2001 IPCA RMEL REN 643/2014 12/3/2013 12/2/2036 19,013.57
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /SANTA ROSA 1 C-1 RS RB FT LT 230 kV SANTO ANGELO /SANTA ROSA 1 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS RB FT LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS 057/2001 IPCA RMEL REN 643/2014 23/09/2013 22/09/2036 18,937.38
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS RB FT LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS 057/2001 IPCA RBNI REA 5861/2016 6/12/2019 6/11/2034 82,503.89
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS RB FT LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  SANTO ANGELO EL 500 kV SANTO ANGELO LT 500 kV CV.GARABI 1 /SANTO ANGELO C-1 RS RB FT LT 500 kV CV.GARABI 1 /SANTO ANGELO C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  SANTO ANGELO EL 500 kV SANTO ANGELO LT 500 kV SANTO ANGELO /ITA C-1 RS/SC RB FT LT 500 kV SANTO ANGELO /ITA C-1 RS/SC 057/2001 IPCA RMEL REN 643/2014 9/6/2016 9/5/2047 710.91
  SANTO ANGELO EL 500 kV SANTO ANGELO LT 500 kV SANTO ANGELO /ITA C-1 RS/SC RB FT LT 500 kV SANTO ANGELO /ITA C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 384,565.57
  SANTO ANGELO IB 230 kV LT 230 kV MACAMBARA /SANTO ANGELO C-1 RS RB FT LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS 007/2014 IPCA RBL CC 007/2014 12/6/2019 29/01/2044 541,011.27
  SANTO ANGELO IB 230 kV MG 500 kV SANTO ANGELO MG1 RS IB5 RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  SANTO ANGELO IB 500 kV MG 500 kV SANTO ANGELO MG1 RS IB1 RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  SANTO ANGELO IB 500 kV MG 500 kV SANTO ANGELO MG1 RS IB2 RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  SANTO ANGELO IB 500 kV MG 500 kV SANTO ANGELO MG1 RS IB3 RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  SANTO ANGELO IB 500 kV MG 500 kV SANTO ANGELO MG1 RS IB4 RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,191.52
  SANTO ANGELO MC 230 kV TR 500/230 kV SANTO ANGELO TR2 RS RB FT TR 500/230 kV SANTO ANGELO TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  SANTO ANGELO MC 230 kV TR 500/230 kV SANTO ANGELO TR2 RS RB FT TR 500/230 kV SANTO ANGELO TR2 RS 057/2001 IPCA RMEL REN 643/2014 10/10/2014 10/9/2037 19,304.24
  SANTO ANGELO MC 230 kV TR 500/230 kV SANTO ANGELO TR3 RS RB FT TR 500/230 kV SANTO ANGELO TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  SANTO ANGELO MC 230 kV TR 525/230 kV SANTO ANGELO TR1 RS RB FT TR 500/230 kV SANTO ANGELO TR1 RS 057/2001 IPCA RBNI REA 5616/2016 2/4/2018 2/3/2041 662,654.54
  SANTO ANGELO MC 500 kV RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 317,792.38
  SANTO ANGELO MC 500 kV RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS 057/2001 IPCA RMEL REN 643/2014 12/10/2014 12/9/2037 40,456.43
  SANTO ANGELO MC 500 kV RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS 057/2001 IPCA RMEL REN 643/2014 3/12/2015 3/11/2048 101.46
  SANTO ANGELO MC 500 kV RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 317,792.38
  SANTO ANGELO MC 500 kV TR 500/230 kV SANTO ANGELO TR2 RS RB FT TR 500/230 kV SANTO ANGELO TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  SANTO ANGELO MC 500 kV TR 500/230 kV SANTO ANGELO TR2 RS RB FT TR 500/230 kV SANTO ANGELO TR2 RS 057/2001 IPCA RMEL REN 643/2014 3/10/2016 3/9/2039 27,414.29
  SANTO ANGELO MC 500 kV TR 500/230 kV SANTO ANGELO TR3 RS RB FT TR 500/230 kV SANTO ANGELO TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,414.67
  SANTO ANGELO MC 525 kV TR 525/230 kV SANTO ANGELO TR1 RS RB FT TR 500/230 kV SANTO ANGELO TR1 RS 057/2001 IPCA RBNI REA 5616/2016 2/4/2018 2/3/2046 1,694,513.96
  SANTO ANGELO MG 500 kV SANTO ANGELO MG1 RS RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBNI REA 5616/2016 2/4/2018 2/3/2050 62,493.97
  SANTO ANGELO MG 500 kV SANTO ANGELO MG1 RS RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBNI REA 5861/2016 21/11/2018 20/11/2035 28,132.83
  SANTO ANGELO MG 500 kV SANTO ANGELO MG1 RS RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RMEL REN 643/2014 10/6/2014 10/5/2031 28,078.36
  SANTO ANGELO MG 500 kV SANTO ANGELO MG1 RS RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RMEL REN 643/2014 22/12/2014 21/12/2041 705.35
  SANTO ANGELO MG 500 kV SANTO ANGELO MG1 RS RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,359,064.11
  SANTO ANGELO RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 633,727.45
  SANTO ANGELO RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,393.68
  SANTO ANGELO RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 794,014.68
  SANTO ANGELO RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 633,727.45
  SANTO ANGELO RTB 500 kV 50 Mvar SANTO ANGELO RTR1 RS RB FT RTB 500 kV 50 Mvar SANTO ANGELO RTR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 211,242.48
  SANTO ANGELO TR 500/230 kV SANTO ANGELO TR2 RS RB FT TR 500/230 kV SANTO ANGELO TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  SANTO ANGELO TR 500/230 kV SANTO ANGELO TR3 RS RB FT TR 500/230 kV SANTO ANGELO TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,315.79
  SANTO ANGELO TR 500/230 kV SANTO ANGELO TRR1 RS RB FT TR 500/230 kV SANTO ANGELO TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 528,105.26

 

36 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  SANTO ANGELO TR 525/230 kV SANTO ANGELO TR1 RS RB FT TR 500/230 kV SANTO ANGELO TR1 RS 057/2001 IPCA RBNI REA 5616/2016 2/4/2018 2/3/2053 6,885,340.32
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,179.29
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU  DIST1 DIT   057/2001 IPCA RCDM REN 443/2011 29/11/2015 28/11/2045 430,951.98
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRIC.FLORESTA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRIC.FLORESTA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 32,503.64
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV SIDEROPOL.CSC /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV SIDEROPOL.CSC /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  SIDEROPOL.ESU IB 230 kV MG 230 kV SIDEROPOL.ESU MG1 SC IB1 RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,853.32
  SIDEROPOL.ESU IB 69 kV MG 230 kV SIDEROPOL.ESU MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,699.48
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,849.25
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 11/8/2020 11/7/2035 12,722.58
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 11/8/2020 11/7/2035 143,984.39
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 11/8/2020 11/7/2035 191,202.00
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8795/2020 13/11/2020 13/11/2057 19,676.71
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,336.76
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,336.76
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 27,412.47
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 64,321.25
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,336.76
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8795/2020 13/11/2020 13/11/2057 10,603.62
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 11/8/2020 11/7/2035 56,632.50
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 11/8/2020 11/7/2035 73,549.57
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,336.76
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 433,399.81
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 8795/2020 13/11/2020 13/11/2053 9,408.14
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 12/1/2016 30/11/2036 2,561.99
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 9/11/2014 9/10/2034 2,341.24
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 1535/2008 6/6/2012 6/5/2040 42,050.11
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REN 443/2011 29/11/2015 28/11/2043 46,311.35
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 273,284.64
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 145,926.76
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 273,284.64
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 273,284.64
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 145,926.76
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 342,405.89
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8795/2020 13/11/2020 13/11/2054 1,573,121.09
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR4D SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4D SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 273,284.64
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR4D SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4D SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 145,926.76
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR4D SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4D SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 342,405.89
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TRR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TRR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,335.64
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TRR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TRR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 80,275.25
  TAPERA 2 BC 230 kV 0 Mvar TAPERA 2 BC1 RS RB FT BC 230 kV 50 Mvar TAPERA 2 BC1 RS 057/2001 IPCA RBNI REA 5603/2016 25/01/2018 24/01/2041 353,289.78
  TAPERA 2 EL 69 kV TAPERA 2  CARAZINHO C1 DIT   057/2001 IPCA RCDM REA 2589/2010 1/7/2014 1/6/2043 344,054.09
  TAPERA 2 EL 69 kV TAPERA 2  CARAZINHO C2 DIT   057/2001 IPCA RCDM REA 2589/2010 1/7/2014 1/6/2043 311,722.07
  TAPERA 2 EL 69 kV TAPERA 2  IBIRUBA DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  TAPERA 2 EL 69 kV TAPERA 2  NAO-ME-TOQUE DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  TAPERA 2 EL 69 kV TAPERA 2  SOLEIDADE DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  TAPERA 2 EL 69 kV TAPERA 2  TAPERA 1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,356.17
  TAPERA 2 IB 69 kV MG 230 kV TAPERA 2 MG2 RS IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,699.48
  TAPERA 2 MC 230 kV BC 230 kV 0 Mvar TAPERA 2 BC1 RS RB FT BC 230 kV 50 Mvar TAPERA 2 BC1 RS 057/2001 IPCA RBNI REA 5603/2016 25/01/2018 24/01/2048 992,084.23
  TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TF3 RS RBF FT TR 230/69 kV TAPERA 2 TF3 RS 057/2001 IPCA RBNI REA 2589/2010 11/9/2012 11/8/2042 837,644.36
  TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TF3 RS RBF FT TR 230/69 kV TAPERA 2 TF3 RS 057/2001 IPCA RMEL REN 643/2014 13/04/2014 4/12/2048 1.90
  TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TR1 RS RBF FT TR 230/69 kV TAPERA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TR1 RS RBF FT TR 230/69 kV TAPERA 2 TR1 RS 057/2001 IPCA RMEL REN 643/2014 4/12/2014 4/11/2048 153.84
  TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TR2 RS RBF FT TR 230/69 kV TAPERA 2 TR2 RS 057/2001 IPCA RMEL REN 643/2014 17/05/2015 16/05/2049 195.45
  TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TR2 RS RBF FT TR 230/69 kV TAPERA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  TAPERA 2 MC 69 kV TR 230/69 kV TAPERA 2 TF3 RS RBF FT TR 230/69 kV TAPERA 2 TF3 RS 057/2001 IPCA RBNI REA 2589/2010 11/9/2012 11/8/2045 581,286.95
  TAPERA 2 MC 69 kV TR 230/69 kV TAPERA 2 TR1 RS RBF FT TR 230/69 kV TAPERA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,336.76
  TAPERA 2 MC 69 kV TR 230/69 kV TAPERA 2 TR2 RS RBF FT TR 230/69 kV TAPERA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,336.76
  TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RBNI REA 2589/2010 14/11/2012 13/11/2037 382,553.42
  TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RBNI REA 6630/2017 20/03/2018 19/03/2035 10,392.76
  TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RBNI REA 5603/2016 25/01/2018 24/01/2046 171,437.99
  TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RMEL REN 643/2014 13/04/2014 4/12/2034 465.80
  TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RMEL REN 643/2014 4/12/2014 4/11/2034 465.73
  TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 346,412.97
  TAPERA 2 TR 230/69 kV TAPERA 2 TF3 RS RBF FT TR 230/69 kV TAPERA 2 TF3 RS 057/2001 IPCA RBNI REA 2589/2010 11/9/2012 11/8/2046 1,159,009.01
  TAPERA 2 TR 230/69 kV TAPERA 2 TR1 RS RBF FT TR 230/69 kV TAPERA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,952.01
  TAPERA 2 TR 230/69 kV TAPERA 2 TR2 RS RBF FT TR 230/69 kV TAPERA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,952.01
  TIJUCAS EL 138 kV TIJUCAS LT 138 kV BIGUACU /TIJUCAS C-1 SC DIT   057/2001 IPCA RCDM REA 2879/2011 20/11/2012 19/11/2042 771,900.70
  TIJUCAS EL 138 kV TIJUCAS LT 138 kV TIJUCAS /CAMBORIU M.B. C-1 SC DIT   057/2001 IPCA RCDM REA 2879/2011 20/11/2012 19/11/2040 549,253.27
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 95,926.20
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-1 MS DIT   057/2001 IPCA RMEL REN 643/2014 25/10/2013 24/10/2036 10,976.46
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RMEL REN 643/2014 25/10/2013 24/10/2036 10,976.46
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 95,926.20
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 95,926.20
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RMEL REN 643/2014 29/08/2013 28/08/2036 10,912.33
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RMEL REN 643/2014 29/08/2013 28/08/2036 10,912.33
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 95,926.20
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 51,659.20
  XANXERE ESU BC 230 kV 100 Mvar XANXERE ESU BC1 SC RB FT BC 230 kV 100 Mvar XANXERE ESU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 202,441.54
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC 002/2011 IPCA RBNI REA 6454/2017 7/1/2017 15/06/2047 150,558.60
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC 002/2011 IPCA RBNI REA 6454/2017 7/1/2017 15/06/2047 150,558.60
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC 057/2001 IPCA RMEL REN 643/2014 17/08/2013 16/08/2036 17,622.41
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC 057/2001 IPCA RMEL REN 643/2014 28/09/2015 27/09/2045 2,312.18
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC 057/2001 IPCA RMEL REN 643/2014 13/09/2014 9/12/2044 2,243.31
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 1/10/2015 1/9/2045 2,264.89
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 1/11/2015 1/10/2045 2,265.07
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 21/08/2013 20/08/2036 17,629.68
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,806.36
  XANXERE ESU IB 230 kV MG 230 kV XANXERE ESU MG1 SC IB1 RB FT MG 230 kV XANXERE ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,976.66
  XANXERE ESU MC 138 kV TR 230/138 kV XANXERE ESU TR1 SC RBF FT TR 230/138 kV XANXERE ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,276.15
  XANXERE ESU MC 138 kV TR 230/138 kV XANXERE ESU TR1 SC RBF FT TR 230/138 kV XANXERE ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 45,001.23
  XANXERE ESU MC 138 kV TR 230/138 kV XANXERE ESU TR2 SC RBF FT TR 230/138 kV XANXERE ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,276.15
  XANXERE ESU MC 138 kV TR 230/138 kV XANXERE ESU TR3 SC RBF FT TR 230/138 kV XANXERE ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,276.15
  XANXERE ESU MC 138 kV TR 230/138 kV XANXERE ESU TR4 SC RBF FT TR 230/138 kV XANXERE ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,276.15
  XANXERE ESU MC 230 kV BC 230 kV 100 Mvar XANXERE ESU BC1 SC RB FT BC 230 kV 100 Mvar XANXERE ESU BC1 SC 057/2001 IPCA RMEL REN 643/2014 12/1/2014 30/11/2046 35.07
  XANXERE ESU MC 230 kV BC 230 kV 100 Mvar XANXERE ESU BC1 SC RB FT BC 230 kV 100 Mvar XANXERE ESU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 142,709.63
  XANXERE ESU MC 230 kV TR 230/138 kV XANXERE ESU TR3 SC RBF FT TR 230/138 kV XANXERE ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14
  XANXERE ESU MC 230 kV TR 230/138 kV XANXERE ESU TR3 SC RBF FT TR 230/138 kV XANXERE ESU TR3 SC 057/2001 IPCA RMEL REN 643/2014 19/10/2014 18/10/2048 196.40
  XANXERE ESU MC 230 kV TR 230/138 kV XANXERE ESU TR4 SC RBF FT TR 230/138 kV XANXERE ESU TR4 SC 057/2001 IPCA RMEL REN 643/2014 11/1/2014 31/10/2048 196.59
  XANXERE ESU MC 230 kV TR 230/138 kV XANXERE ESU TR4 SC RBF FT TR 230/138 kV XANXERE ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,852.14

 

37 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  XANXERE ESU MG 230 kV XANXERE ESU MG1 SC RB FT MG 230 kV XANXERE ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 485,474.48
  XANXERE ESU MG 230 kV XANXERE ESU MG1 SC RB FT MG 230 kV XANXERE ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 29/06/2015 28/06/2035 2,420.35
  XANXERE ESU MG 230 kV XANXERE ESU MG1 SC RB FT MG 230 kV XANXERE ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 29/06/2015 28/06/2035 2,420.35
  XANXERE ESU MG 230 kV XANXERE ESU MG1 SC RB FT MG 230 kV XANXERE ESU MG1 SC 057/2001 IPCA RBNI REA 2164/2009 31/05/2012 30/05/2037 149,299.78
  XANXERE ESU MG 230 kV XANXERE ESU MG2 SC RB FT MG 230 kV XANXERE ESU MG2 SC 002/2011 IPCA RBNI REA 6454/2017 7/1/2017 15/06/2040 48,306.80
  XANXERE ESU TR 230/138 kV XANXERE ESU TR1 SC RBF FT TR 230/138 kV XANXERE ESU TR1 SC 057/2001 IPCA RMEL REN 643/2014 16/08/2015 15/08/2055 447.98
  XANXERE ESU TR 230/138 kV XANXERE ESU TR1 SC RBF FT TR 230/138 kV XANXERE ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  XANXERE ESU TR 230/138 kV XANXERE ESU TR2 SC RBF FT TR 230/138 kV XANXERE ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  XANXERE ESU TR 230/138 kV XANXERE ESU TR2 SC RBF FT TR 230/138 kV XANXERE ESU TR2 SC 057/2001 IPCA RMEL REN 643/2014 17/11/2014 16/11/2054 34.43
  XANXERE ESU TR 230/138 kV XANXERE ESU TR3 SC RBF FT TR 230/138 kV XANXERE ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
  XANXERE ESU TR 230/138 kV XANXERE ESU TR4 SC RBF FT TR 230/138 kV XANXERE ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,148.05
CHESF ABAIXADORA EL 69 kV ABAIXADORA  DELMIRO GOUVEIA DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046 4,386.14
  ABAIXADORA EL 69 kV ABAIXADORA  DELMIRO GOUVEIA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MOXOTO C-1 BA DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046 8,772.28
  ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MULUNGU C-1 BA DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046 8,772.28
  ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MULUNGU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /ZEBU C-1 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /ZEBU C-1 BA/AL DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046 4,386.14
  ABAIXADORA IB 230 kV MG 230 kV ABAIXADORA MG1 BA IB1 RB FT MG 230 kV ABAIXADORA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  ABAIXADORA IB 69 kV MG 230 kV ABAIXADORA MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  ABAIXADORA MC 13,8 kV TR 69/13,8 kV ABAIXADORA TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  ABAIXADORA MC 13,8 kV TR 69/13,8 kV ABAIXADORA TR6 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  ABAIXADORA MC 230 kV TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,587.79
  ABAIXADORA MC 230 kV TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 90,646.37
  ABAIXADORA MC 69 kV TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBNI REA 2040/2009 24/03/2013 23/03/2044 69,552.58
  ABAIXADORA MC 69 kV TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ABAIXADORA MC 69 kV TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  ABAIXADORA MC 69 kV TR 69/13,8 kV ABAIXADORA TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,615.66
  ABAIXADORA MC 69 kV TR 69/13,8 kV ABAIXADORA TR3 BA DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046 6,579.21
  ABAIXADORA MC 69 kV TR 69/13,8 kV ABAIXADORA TR6 BA DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046 6,579.21
  ABAIXADORA MC 69 kV TR 69/13,8 kV ABAIXADORA TR6 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,615.66
  ABAIXADORA MG 230 kV ABAIXADORA MG1 BA RB FT MG 230 kV ABAIXADORA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 400,867.40
  ABAIXADORA MG 230 kV ABAIXADORA MG1 BA RB FT MG 230 kV ABAIXADORA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 380,144.51
  ABAIXADORA MG 230 kV ABAIXADORA MG1 BA RB FT MG 230 kV ABAIXADORA MG1 BA 061/2001 IPCA RMEL REN 643/2014 11/9/2015 11/8/2032 27,795.80
  ABAIXADORA TR 230/69 kV ABAIXADORA TR1 BA RBF FT TR 230/69 kV ABAIXADORA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,471.60
  ABAIXADORA TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  ABAIXADORA TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  ABAIXADORA TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  ABAIXADORA TR 230/69 kV ABAIXADORA TRR1 BA RBF FT TR 230/69 kV ABAIXADORA TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,471.60
  ABAIXADORA TR 69/13,8 kV ABAIXADORA TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  ABAIXADORA TR 69/69 kV ABAIXADORA TREG1 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,394.59
  ABAIXADORA TT 69/13,8 kV ABAIXADORA TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  ABAIXADORA TT 69/13,8 kV ABAIXADORA TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  ABAIXADORA TT 69/13,8 kV ABAIXADORA TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  ACARAU II EL 230 kV ACARAU II LT 230 kV SOBRAL III /ACARAU II C-1 CE RB FT LT 230 kV SOBRAL III /ACARAU II C-1 CE 021/2010 IPCA RBL CC 021/2010 4/8/2014 23/11/2040 421,182.00
  ACARAU II EL 69 kV ACARAU II  DIST01 DIT   021/2010 IPCA RCDM REN 905/2020 16/10/2020 15/10/2047 302,220.02
  ACARAU II EL 69 kV ACARAU II  DIST02 DIT   021/2010 IPCA RCDM REN 905/2020 16/10/2020 15/10/2047 302,220.02
  ACARAU II IB 69 kV MG 69 kV ACARAU II MG1 CE IB1 ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 99,609.49
  ACARAU II MC 230 kV RTB 230 kV 20 Mvar ACARAU II RT1 CE RB FT RTB 230 kV 20 Mvar ACARAU II RT1 CE 021/2010 IPCA RBL CC 021/2010 4/8/2014 23/11/2040 288,572.64
  ACARAU II MC 230 kV TR 230/69 kV ACARAU II TR1 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 359,039.90
  ACARAU II MC 230 kV TR 230/69 kV ACARAU II TR2 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 359,039.90
  ACARAU II MC 69 kV TR 230/69 kV ACARAU II TR1 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 146,080.42
  ACARAU II MC 69 kV TR 230/69 kV ACARAU II TR2 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 146,080.42
  ACARAU II MC 69 kV TT 69/0 kV ACARAU II TT1 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 62,304.32
  ACARAU II MG 230 kV ACARAU II MG1 CE RB FT MG 230 kV ACARAU II MG1 CE 021/2010 IPCA RBNI REN 905/2020 16/10/2020 15/10/2051 29,153.12
  ACARAU II MG 230 kV ACARAU II MG1 CE RB FT MG 230 kV ACARAU II MG1 CE 021/2010 IPCA RBNI REN 905/2020 16/10/2020 15/10/2051 29,153.12
  ACARAU II MG 230 kV ACARAU II MG1 CE RB FT MG 230 kV ACARAU II MG1 CE 021/2010 IPCA RBL CC 021/2010 4/8/2014 23/11/2040 637,858.51
  ACARAU II MG 69 kV ACARAU II MG1 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 62,742.08
  ACARAU II RTB 230 kV 20 Mvar ACARAU II RT1 CE RB FT RTB 230 kV 20 Mvar ACARAU II RT1 CE 021/2010 IPCA RBL CC 021/2010 4/8/2014 23/11/2040 428,401.94
  ACARAU II TR 230/69 kV ACARAU II TR1 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 922,761.70
  ACARAU II TR 230/69 kV ACARAU II TR2 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 922,761.70
  ACARAU II TT 69/0 kV ACARAU II TT1 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 80,554.43
  ACU II BC 13,8 kV 3,1 MVAr ACU II BC1 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC1 RN 061/2001 IPCA RMEL REN 643/2014 22/01/2014 21/01/2028 41,989.93
  ACU II BC 13,8 kV 3,1 MVAr ACU II BC1 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  ACU II BC 13,8 kV 3,1 MVAr ACU II BC2 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  ACU II BC 13,8 kV 3,1 MVAr ACU II BC2 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC2 RN 061/2001 IPCA RMEL REN 643/2014 17/01/2014 16/01/2028 41,958.13
  ACU II BC 13,8 kV 3,6 MVAr ACU II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN 061/2001 IPCA RMEL REN 643/2014 24/01/2014 23/01/2028 42,002.66
  ACU II BC 13,8 kV 3,6 MVAr ACU II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  ACU II BC 13,8 kV 3,6 MVAr ACU II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 25,881.87
  ACU II BC 13,8 kV 3,6 MVAr ACU II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  ACU II BC 13,8 kV 3,6 MVAr ACU II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 25,881.87
  ACU II BC 13,8 kV 3,6 MVAr ACU II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN 061/2001 IPCA RMEL REN 643/2014 15/01/2014 14/01/2028 41,945.41
  ACU II EL 138 kV ACU II  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  ACU II EL 138 kV ACU II  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  ACU II EL 138 kV ACU II LT 138 kV ACU II /SAN.MATOS II C-1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  ACU II EL 230 kV ACU II LT 230 kV MOSSORO II /ACU II C-1 RN RB FT LT 230 kV MOSSORO II /ACU II C-1 RN 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  ACU II EL 230 kV ACU II LT 230 kV MOSSORO II /ACU II C-1 RN RB FT LT 230 kV MOSSORO II /ACU II C-1 RN 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2031 103,531.43
  ACU II EL 230 kV ACU II LT 230 kV MOSSORO II /ACU II C-1 RN RB FT LT 230 kV MOSSORO II /ACU II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  ACU II EL 230 kV ACU II LT 230 kV MOSSORO II /ACU II C-1 RN RB FT LT 230 kV MOSSORO II /ACU II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  ACU II EL 230 kV ACU II LT 230 kV MOSSORO II /ACU II C-1395 RN RB FT LT 230 kV MOSSORO II /ACU II C-2 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040 318,261.74
  ACU II EL 230 kV ACU II LT 230 kV PARAISO /ACU II C-2 RN RB FT LT 230 kV PARAISO /ACU II C-2 RN 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 412,952.82
  ACU II EL 69 kV ACU II  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ACU II EL 69 kV ACU II  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ACU II EL 69 kV ACU II  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ACU II EL 69 kV ACU II  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ACU II EL 69 kV ACU II  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ACU II EL 69 kV ACU II  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ACU II EL 69 kV ACU II  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ACU II EL 69 kV ACU II  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ACU II EL 69 kV ACU II  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ACU II EL 69 kV ACU II  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ACU II EL 69 kV ACU II  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ACU II IB 13,8 kV MG 230 kV ACU II MG1 RN IB4 RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,547.19
  ACU II IB 13,8 kV MG 230 kV ACU II MG1 RN IB4 RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 24,226.52
  ACU II IB 138 kV MG 230 kV ACU II MG1 RN IB3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,407.76
  ACU II IB 230 kV MG 230 kV ACU II MG1 RN IB1 RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  ACU II IB 230 kV MG 230 kV ACU II MG1 RN IB1 RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  ACU II IB 69 kV MG 230 kV ACU II MG1 RN IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  ACU II IB 69 kV MG 230 kV ACU II MG1 RN IB2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  ACU II MC 13,8 kV BC 13,8 kV 3,1 MVAr ACU II BC1 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  ACU II MC 13,8 kV BC 13,8 kV 3,1 MVAr ACU II BC2 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  ACU II MC 13,8 kV BC 13,8 kV 3,6 MVAr ACU II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  ACU II MC 13,8 kV BC 13,8 kV 3,6 MVAr ACU II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,860.37
  ACU II MC 13,8 kV BC 13,8 kV 3,6 MVAr ACU II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  ACU II MC 13,8 kV BC 13,8 kV 3,6 MVAr ACU II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,860.37
  ACU II MC 13,8 kV RTB 13,8 kV 5 MVAr ACU II RT1 RN RBF FT RTB 13,8 kV 5 MVAr ACU II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  ACU II MC 13,8 kV TR 230/69 kV ACU II TR4 RN RBF FT TR 230/69 kV ACU II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  ACU II MC 13,8 kV TR 230/69 kV ACU II TR5 RN RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  ACU II MC 138 kV TR 230/138 kV ACU II TR2 RN RBF FT TR 230/138 kV ACU II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94

 

38 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  ACU II MC 138 kV TR 230/138 kV ACU II TR2 RN RBF FT TR 230/138 kV ACU II TR2 RN 061/2001 IPCA RMEL REN 443/2011 4/10/2016 4/9/2046 10,823.95
  ACU II MC 138 kV TR 230/138 kV ACU II TR3 RN RBF FT TR 230/138 kV ACU II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  ACU II MC 230 kV TR 230/138 kV ACU II TR2 RN RBF FT TR 230/138 kV ACU II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  ACU II MC 230 kV TR 230/138 kV ACU II TR2 RN RBF FT TR 230/138 kV ACU II TR2 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  ACU II MC 230 kV TR 230/138 kV ACU II TR3 RN RBF FT TR 230/138 kV ACU II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  ACU II MC 230 kV TR 230/69 kV ACU II TR4 RN RBF FT TR 230/69 kV ACU II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  ACU II MC 230 kV TR 230/69 kV ACU II TR5 RN RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  ACU II MC 230 kV TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  ACU II MC 230 kV TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  ACU II MC 230 kV TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  ACU II MC 230 kV TR 230/69 kV ACU II TR7 RN RBF FT TR 230/69 kV ACU II TR7 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  ACU II MC 69 kV TR 230/69 kV ACU II TR4 RN RBF FT TR 230/69 kV ACU II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ACU II MC 69 kV TR 230/69 kV ACU II TR5 RN RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ACU II MC 69 kV TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ACU II MC 69 kV TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  ACU II MC 69 kV TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  ACU II MC 69 kV TR 230/69 kV ACU II TR7 RN RBF FT TR 230/69 kV ACU II TR7 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 632,625.99
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 599,922.32
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,941,465.66
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBNI REA 2837/2011 26/03/2013 25/03/2053 3,941.56
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RMEL REN 443/2011 10/4/2016 10/3/2033 28,938.33
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RMEL REN 643/2014 12/3/2013 12/2/2030 25,351.50
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RMEL REN 643/2014 23/05/2015 22/05/2043 64,885.01
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RMEL REN 643/2014 17/12/2015 16/12/2029 38,226.53
  ACU II RTB 13,8 kV 5 MVAr ACU II RT1 RN RBF FT RTB 13,8 kV 5 MVAr ACU II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  ACU II TR 230/138 kV ACU II TR2 RN RBF FT TR 230/138 kV ACU II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,278.01
  ACU II TR 230/138 kV ACU II TR3 RN RBF FT TR 230/138 kV ACU II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,278.01
  ACU II TR 230/69 kV ACU II TR4 RN RBF FT TR 230/69 kV ACU II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 191,938.38
  ACU II TR 230/69 kV ACU II TR5 RN RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBNI REA 2460/2010 4/8/2013 4/7/2043 346,314.93
  ACU II TR 230/69 kV ACU II TR5 RN RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 191,938.38
  ACU II TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 226,840.77
  ACU II TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 215,114.21
  ACU II TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 696,151.54
  ACU II TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBNI REA 2968/2011 4/5/2013 4/4/2043 346,240.47
  ACU II TR 230/69 kV ACU II TR7 RN RBF FT TR 230/69 kV ACU II TR7 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 226,840.77
  ACU II TT 69/13,8 kV ACU II TA1 RN DIT   061/2001 IPCA RCDM REA 3578/2012 10/11/2015 10/10/2045 193,644.54
  ANGELIM EL 13,8 kV ANGELIM  AUXIL1 RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 45,840.82
  ANGELIM EL 13,8 kV ANGELIM  AUXIL2 RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 45,840.82
  ANGELIM EL 13,8 kV ANGELIM  PALMERINA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBNI REA 2837/2011 13/03/2015 3/12/2045 25,239.71
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RMEL REN 443/2011 8/4/2015 8/3/2045 13,888.64
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RMEL REN 443/2011 29/04/2016 28/04/2046 1,751.62
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBNI REA 2837/2011 26/03/2015 25/03/2045 37,898.08
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RMEL REN 443/2011 6/2/2016 6/1/2046 1,736.47
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBNI REA 2837/2011 30/04/2015 29/04/2045 38,001.76
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  ANGELIM EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-1 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  ANGELIM EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-2 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  ANGELIM EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-3 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE 061/2001 IPCA RBNI REA 2837/2011 14/04/2015 13/04/2045 37,954.36
  ANGELIM EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-3 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  ANGELIM EL 230 kV ANGELIM LT 230 kV P.AFONSO III /ANGELIM C-1 AL/PE RB FT LT 230 kV P.AFONSO III /ANGELIM C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  ANGELIM EL 230 kV ANGELIM LT 230 kV P.AFONSO III /ANGELIM C-1 AL/PE RB FT LT 230 kV P.AFONSO III /ANGELIM C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  ANGELIM EL 230 kV ANGELIM LT 230 kV P.AFONSO III /ANGELIM C-1 AL/PE RB FT LT 230 kV P.AFONSO III /ANGELIM C-1 AL/PE 061/2001 IPCA RBNI REA 2837/2011 20/03/2015 19/03/2045 37,880.31
  ANGELIM EL 69 kV ANGELIM  DIST1 DIT   061/2001 IPCA RMEL REN 643/2014 20/10/2015 19/10/2029 8,624.37
  ANGELIM EL 69 kV ANGELIM  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ANGELIM EL 69 kV ANGELIM  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ANGELIM EL 69 kV ANGELIM  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ANGELIM EL 69 kV ANGELIM  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ANGELIM EL 69 kV ANGELIM  DIST2 DIT   061/2001 IPCA RMEL REN 643/2014 27/10/2015 26/10/2029 2,133.92
  ANGELIM EL 69 kV ANGELIM  DIST2 DIT   061/2001 IPCA RMEL REN 643/2014 23/10/2015 22/10/2029 4,265.50
  ANGELIM EL 69 kV ANGELIM  DIST3 DIT   061/2001 IPCA RMEL REN 643/2014 24/10/2015 23/10/2029 4,266.09
  ANGELIM EL 69 kV ANGELIM  DIST3 DIT   061/2001 IPCA RMEL REN 643/2014 27/10/2015 26/10/2029 2,133.92
  ANGELIM EL 69 kV ANGELIM  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ANGELIM EL 69 kV ANGELIM  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ANGELIM EL 69 kV ANGELIM  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ANGELIM EL 69 kV ANGELIM  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ANGELIM EL 69 kV ANGELIM  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ANGELIM EL 69 kV ANGELIM  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ANGELIM EL 69 kV ANGELIM  DIST4 DIT   061/2001 IPCA RMEL REN 643/2014 21/10/2015 20/10/2029 8,528.64
  ANGELIM EL 69 kV ANGELIM  DIST5 DIT   061/2001 IPCA RMEL REN 443/2011 5/2/2016 5/1/2030 2,063.21
  ANGELIM EL 69 kV ANGELIM  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ANGELIM EL 69 kV ANGELIM  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ANGELIM EL 69 kV ANGELIM  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ANGELIM EL 69 kV ANGELIM  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ANGELIM EL 69 kV ANGELIM  DIST6 DIT   061/2001 IPCA RMEL REN 643/2014 19/10/2015 18/10/2029 8,526.28
  ANGELIM EL 69 kV ANGELIM  DIST6 DIT   061/2001 IPCA RMEL REN 443/2011 13/06/2016 6/12/2039 2,090.00
  ANGELIM EL 69 kV ANGELIM  DIST6 DIT   061/2001 IPCA RMEL REN 443/2011 6/12/2016 6/11/2039 2,089.82
  ANGELIM EL 69 kV ANGELIM  DIST6 DIT   061/2001 IPCA RMEL REN 443/2011 6/12/2016 6/11/2039 2,089.82
  ANGELIM EL 69 kV ANGELIM  DIST7 DIT   061/2001 IPCA RMEL REN 643/2014 22/10/2015 21/10/2029 8,723.68
  ANGELIM EL 69 kV ANGELIM  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ANGELIM EL 69 kV ANGELIM  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ANGELIM EL 69 kV ANGELIM  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ANGELIM EL 69 kV ANGELIM  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ANGELIM EL 69 kV ANGELIM  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ANGELIM EL 69 kV ANGELIM  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ANGELIM EL 69 kV ANGELIM  DIST8 DIT   061/2001 IPCA RMEL REN 643/2014 26/10/2015 25/10/2029 6,400.91
  ANGELIM IB 230 kV MG 230 kV ANGELIM MG1 PE IB1 RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21

 

39 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  ANGELIM IB 230 kV MG 230 kV ANGELIM MG1 PE IB1 RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  ANGELIM IB 230 kV MG 230 kV ANGELIM MG1 PE IB2 RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  ANGELIM IB 69 kV MG 230 kV ANGELIM MG1 PE IB3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  ANGELIM IB 69 kV MG 230 kV ANGELIM MG1 PE IB3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  ANGELIM IB 69 kV MG 230 kV ANGELIM MG1 PE IB3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  ANGELIM MC 13,8 kV TR 69/13,8 kV ANGELIM TR4A PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR6 PE RBF FT TR 230/69 kV ANGELIM TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR6 PE RBF FT TR 230/69 kV ANGELIM TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ANGELIM MC 69 kV TR 69/13,8 kV ANGELIM TR4A PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,615.66
  ANGELIM MC 69 kV TR 69/13,8 kV ANGELIM TR4A PE DIT   061/2001 IPCA RMEL REN 643/2014 26/10/2015 25/10/2029 4,645.31
  ANGELIM MC 69 kV TR 69/13,8 kV ANGELIM TR4A PE DIT   061/2001 IPCA RMEL REN 643/2014 27/10/2015 26/10/2029 2,230.93
  ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 33,364.51
  ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RMEL REN 443/2011 8/4/2016 8/3/2033 28,727.14
  ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RMEL REN 443/2011 18/07/2016 17/07/2046 3,467.00
  ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RMEL REN 443/2011 4/1/2016 31/03/2030 48,438.91
  ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 693,059.08
  ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 657,231.31
  ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,126,928.74
  ANGELIM TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  ANGELIM TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  ANGELIM TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  ANGELIM TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  ANGELIM TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  ANGELIM TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  ANGELIM TR 230/69 kV ANGELIM TR6 PE RBF FT TR 230/69 kV ANGELIM TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  ANGELIM TR 69/13,8 kV ANGELIM TR4A PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  ANGELIM TR 69/13,8 kV ANGELIM TR4B PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  ANGELIM TR 69/13,8 kV ANGELIM TR4B PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 24,344.47
  ANGELIM TR 69/13,8 kV ANGELIM TR4B PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 76,089.76
  ANGELIM TT 69/13,8 kV ANGELIM TA1 PE DIT   061/2001 IPCA RCDM REA 3578/2012 27/11/2015 26/11/2045 194,250.51
  ANGELIM TT 69/13,8 kV ANGELIM TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  ANGELIM TT 69/13,8 kV ANGELIM TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  ANGELIM TT 69/13,8 kV ANGELIM TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  ANGELIM II EL 500 kV ANGELIM II LT 500 kV ANGELIM II /PAU FERRO C-1 PE RB FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE 061/2001 IPCA RBNI REA 5861/2016 6/8/2016 6/7/2044 24,297.02
  ANGELIM II EL 500 kV ANGELIM II LT 500 kV ANGELIM II /PAU FERRO C-1 PE RB FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  ANGELIM II EL 500 kV ANGELIM II LT 500 kV ANGELIM II /RECIFE II C-2 PE RB FT LT 500 kV ANGELIM II /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  ANGELIM II EL 500 kV ANGELIM II LT 500 kV GARANHUNS II /ANGELIM II C-1 PE RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  ANGELIM II EL 500 kV ANGELIM II LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  ANGELIM II IB 500 kV MG 500 kV ANGELIM II MG1 PE IB1 RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  ANGELIM II IB 500 kV MG 500 kV ANGELIM II MG1 PE IB2 RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  ANGELIM II MC 500 kV RTB 500 kV 150 MVAr ANGELIM II RT1 PE RB FT RTB 500 kV 150 MVAr ANGELIM II RT1 PE 061/2001 IPCA RMEL REN 643/2014 2/2/2013 2/1/2043 29,057.01
  ANGELIM II MC 500 kV RTB 500 kV 150 MVAr ANGELIM II RT1 PE RB FT RTB 500 kV 150 MVAr ANGELIM II RT1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 356,129.72
  ANGELIM II MG 500 kV ANGELIM II MG1 PE RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RMEL REN 643/2014 17/12/2015 16/12/2032 27,335.85
  ANGELIM II MG 500 kV ANGELIM II MG1 PE RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2043 45,406.42
  ANGELIM II MG 500 kV ANGELIM II MG1 PE RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,098,583.68
  ANGELIM II RTB 500 kV 150 MVAr ANGELIM II RT1 PE RB FT RTB 500 kV 150 MVAr ANGELIM II RT1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,178.08
  ANGELIM II RTB 500 kV 50 MVAr ANGELIM II RTR1 PE RB FT RTB 500 kV 50 MVAr ANGELIM II RTR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 236,726.03
  ANGELIM II RTB 500 kV 50 MVAr ANGELIM II RTR1 PE RB FT RTB 500 kV 50 MVAr ANGELIM II RTR1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 224,488.45
  ANGELIM II RTL 500 kV 150 MVAr ANGELIM II RT2 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,178.08
  ANGELIM II RTL 500 kV 150 MVAr ANGELIM II RT2 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 673,465.34
  ANGELIM II RTL 500 kV 150 MVAr ANGELIM II RT3 PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,178.08
  ANGELIM II RTL 500 kV 150 MVAr ANGELIM II RT3 PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 673,465.34
  AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV AQUIRAZ II /FORTALEZA C-143 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-143 CE 061/2001 IPCA RBNIA REA 3631/2012     660,567.28
  AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBNI REA 2823/2011 10/2/2020 10/2/2049 689,787.90
  AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBNI REA 3631/2012 11/6/2020 11/6/2045 660,567.28
  AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE 061/2001 IPCA RBNI REA 2823/2011 10/2/2020 10/2/2049 689,787.90
  AQUIRAZ II EL 69 kV AQUIRAZ II  DIST1 DIT   004/2010 IPCA RPEC CC 004/2010 7/12/2010 7/11/2040 147,910.59
  AQUIRAZ II EL 69 kV AQUIRAZ II  DIST2 DIT   004/2010 IPCA RPEC CC 004/2010 7/12/2010 7/11/2040 147,910.59
  AQUIRAZ II EL 69 kV AQUIRAZ II  DIST3 DIT   004/2010 IPCA RPEC CC 004/2010 7/12/2010 7/11/2040 147,910.59
  AQUIRAZ II EL 69 kV AQUIRAZ II  DIST4 DIT   004/2010 IPCA RPEC CC 004/2010 7/12/2010 7/11/2040 147,910.59
  AQUIRAZ II EL 69 kV AQUIRAZ II  EUZEBIO 1 DIT   004/2010 IPCA RCDM REA 2837/2011 12/11/2013 12/10/2037 238,111.00
  AQUIRAZ II EL 69 kV AQUIRAZ II  EUZEBIO 2 DIT   004/2010 IPCA RCDM REA 2837/2011 12/11/2013 12/10/2037 238,111.00
  AQUIRAZ II EL 69 kV AQUIRAZ II  EUZEBIO 3 DIT   004/2010 IPCA RCDM REA 2837/2011 12/11/2013 12/10/2037 238,111.00
  AQUIRAZ II IB 230 kV MG 230 kV AQUIRAZ II MG1 CE IB1 RB FT MG 230 kV AQUIRAZ II MG1 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 356,041.41
  AQUIRAZ II IB 69 kV MG 230 kV AQUIRAZ II MG1 CE IB1 DIT   004/2010 IPCA RPEC CC 004/2010 7/12/2010 7/11/2040 83,357.62
  AQUIRAZ II MC 230 kV TR 230/69 kV AQUIRAZ II TR1 CE RBF FT TR 230/69 kV AQUIRAZ II TR1 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 484,877.73
  AQUIRAZ II MC 230 kV TR 230/69 kV AQUIRAZ II TR2 CE RBF FT TR 230/69 kV AQUIRAZ II TR2 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 484,877.73
  AQUIRAZ II MC 230 kV TR 230/69 kV AQUIRAZ II TR3 CE RBF FT TR 230/69 kV AQUIRAZ II TR3 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 484,877.73
  AQUIRAZ II MC 69 kV TR 230/69 kV AQUIRAZ II TR1 CE RBF FT TR 230/69 kV AQUIRAZ II TR1 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 193,255.69
  AQUIRAZ II MC 69 kV TR 230/69 kV AQUIRAZ II TR2 CE RBF FT TR 230/69 kV AQUIRAZ II TR2 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 193,255.69
  AQUIRAZ II MC 69 kV TR 230/69 kV AQUIRAZ II TR3 CE RBF FT TR 230/69 kV AQUIRAZ II TR3 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 193,255.69
  AQUIRAZ II MC 69 kV TT 69/0 kV AQUIRAZ II TT1 CE DIT   004/2010 IPCA RPEC CC 004/2010 7/12/2010 7/11/2040 57,316.32
  AQUIRAZ II MG 230 kV AQUIRAZ II MG1 CE RB FT MG 230 kV AQUIRAZ II MG1 CE 004/2010 IPCA RBNI REA 2837/2011 12/11/2013 12/10/2044 39,234.81
  AQUIRAZ II MG 230 kV AQUIRAZ II MG1 CE RB FT MG 230 kV AQUIRAZ II MG1 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 1,095,745.41
  AQUIRAZ II MG 230 kV AQUIRAZ II MG2 CE RB FT MG 230 kV AQUIRAZ II MG2 CE 061/2001 IPCA RBNI REA 3631/2012 11/9/2020 11/9/2053 101,699.90
  AQUIRAZ II MG 230 kV AQUIRAZ II MG2 CE RB FT MG 230 kV AQUIRAZ II MG2 CE 061/2001 IPCA RMEL REN 443/2011 10/7/2016 10/6/2033 30,555.54
  AQUIRAZ II MG 230 kV AQUIRAZ II MG2 CE RB FT MG 230 kV AQUIRAZ II MG2 CE 061/2001 IPCA RBNI REA 2823/2011 10/2/2020 10/2/2057 105,085.65
  AQUIRAZ II TR 230/69 kV AQUIRAZ II TR1 CE RBF FT TR 230/69 kV AQUIRAZ II TR1 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 1,006,658.36
  AQUIRAZ II TR 230/69 kV AQUIRAZ II TR2 CE RBF FT TR 230/69 kV AQUIRAZ II TR2 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 1,006,658.36
  AQUIRAZ II TR 230/69 kV AQUIRAZ II TR3 CE RBF FT TR 230/69 kV AQUIRAZ II TR3 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 1,006,658.36
  AQUIRAZ II TT 69/0 kV AQUIRAZ II TT1 CE DIT   004/2010 IPCA RPEC CC 004/2010 7/12/2010 7/11/2040 50,273.04
  ARAPIRACA III BC 230 kV 30 Mvar ARAPIRACA III BC1 AL RB FT BC 230 kV 30 Mvar ARAPIRACA III BC1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 10/6/2040 594,707.88
  ARAPIRACA III BC 230 kV 30 Mvar ARAPIRACA III BC2 AL RB FT BC 230 kV 30 Mvar ARAPIRACA III BC2 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 10/6/2040 594,707.88
  ARAPIRACA III EL 230 kV ARAPIRACA III LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2044 131,990.95
  ARAPIRACA III EL 230 kV ARAPIRACA III LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2044 131,990.95
  ARAPIRACA III EL 69 kV ARAPIRACA III  ARAPIRACA II DIT   013/2010 IPCA RCDM REN 443/2011 16/10/2016 15/10/2039 382,158.28
  ARAPIRACA III EL 69 kV ARAPIRACA III  DIST1 DIT   013/2010 IPCA RPEC CC 013/2010 10/6/2010 10/6/2040 197,578.78
  ARAPIRACA III IB 230 kV MG 230 kV ARAPIRACA III MG1 AL IB1 RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 10/6/2040 661,600.72
  ARAPIRACA III IB 69 kV MG 230 kV ARAPIRACA III MG1 AL IB1 DIT   013/2010 IPCA RPEC CC 013/2010 10/6/2010 10/6/2040 114,112.83
  ARAPIRACA III MC 230 kV BC 230 kV 30 Mvar ARAPIRACA III BC1 AL RB FT BC 230 kV 30 Mvar ARAPIRACA III BC1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 10/6/2040 993,033.61
  ARAPIRACA III MC 230 kV BC 230 kV 30 Mvar ARAPIRACA III BC2 AL RB FT BC 230 kV 30 Mvar ARAPIRACA III BC2 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 10/6/2040 993,033.61
  ARAPIRACA III MC 230 kV RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL RB FT RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL 013/2010 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2042 66,782.73
  ARAPIRACA III MC 230 kV TR 230/69 kV ARAPIRACA III TR1 AL RBF FT TR 230/69 kV ARAPIRACA III TR1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 10/6/2040 894,562.76
  ARAPIRACA III MC 230 kV TR 230/69 kV ARAPIRACA III TR2 AL RBF FT TR 230/69 kV ARAPIRACA III TR2 AL 013/2010 IPCA RBNI REA 5211/2015 24/10/2016 24/10/2040 964,487.60
  ARAPIRACA III MC 69 kV TR 230/69 kV ARAPIRACA III TR1 AL RBF FT TR 230/69 kV ARAPIRACA III TR1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 10/6/2040 355,727.04
  ARAPIRACA III MC 69 kV TR 230/69 kV ARAPIRACA III TR2 AL RBF FT TR 230/69 kV ARAPIRACA III TR2 AL 013/2010 IPCA RBNI REA 5211/2015 24/10/2016 24/10/2039 355,953.11
  ARAPIRACA III MC 69 kV TT 69/0 kV ARAPIRACA III TT1 AL DIT   013/2010 IPCA RPEC CC 013/2010 10/6/2010 10/6/2040 75,974.28
  ARAPIRACA III MG 230 kV ARAPIRACA III MG1 AL RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RBNI REA 5211/2015 24/10/2016 24/10/2048 146,082.89

 

40 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  ARAPIRACA III MG 230 kV ARAPIRACA III MG1 AL RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RMEL REN 443/2011 18/04/2016 17/04/2031 9,540.02
  ARAPIRACA III MG 230 kV ARAPIRACA III MG1 AL RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RBNI REN 443/2011 16/10/2016 15/10/2047 32,674.09
  ARAPIRACA III MG 230 kV ARAPIRACA III MG1 AL RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RMEL REN 643/2014 22/05/2015 21/05/2030 70,026.58
  ARAPIRACA III MG 230 kV ARAPIRACA III MG1 AL RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 10/6/2040 2,004,074.95
  ARAPIRACA III RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL RB FT RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL 013/2010 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2051 69,095.38
  ARAPIRACA III TR 230/69 kV ARAPIRACA III TR1 AL RBF FT TR 230/69 kV ARAPIRACA III TR1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 10/6/2040 2,320,025.38
  ARAPIRACA III TR 230/69 kV ARAPIRACA III TR2 AL RBF FT TR 230/69 kV ARAPIRACA III TR2 AL 013/2010 IPCA RBNI REA 5211/2015 24/10/2016 24/10/2050 1,269,415.05
  ARAPIRACA III TT 69/0 kV ARAPIRACA III TT1 AL DIT   013/2010 IPCA RPEC CC 013/2010 10/6/2010 10/6/2040 70,276.32
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RMEL REN 643/2014 25/05/2014 24/05/2042 34,818.37
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RMEL REN 643/2014 11/8/2014 11/7/2044 17,803.18
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RMEL REN 643/2014 12/7/2014 12/6/2044 37,670.91
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2031 103,531.43
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RMEL REN 443/2011 21/02/2016 20/02/2044 21,845.71
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RMEL REN 643/2014 22/09/2014 21/09/2044 53,214.74
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  B. ESPERANCA EL 500 kV B. ESPERANCA LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RMEL REN 443/2011 6/4/2016 6/3/2046 16,001.77
  B. ESPERANCA EL 500 kV B. ESPERANCA LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  B. ESPERANCA EL 500 kV B. ESPERANCA LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RMEL REN 443/2011 8/1/2017 31/07/2045 14,000.60
  B. ESPERANCA EL 500 kV B. ESPERANCA LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  B. ESPERANCA IB 230 kV MG 500 kV B. ESPERANCA MG1 PI IB1 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB1 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB1 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB1 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB2 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB2 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB3 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  B. ESPERANCA MC 13,8 kV RTS 13,8 kV 5 Mvar B. ESPERANCA RT1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 34,310.42
  B. ESPERANCA MC 230 kV TR 500/230 kV B. ESPERANCA TR1 PI MC1 RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  B. ESPERANCA MC 230 kV TR 500/230 kV B. ESPERANCA TR1 PI MC2 RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  B. ESPERANCA MC 500 kV RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI RB FT RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 356,129.72
  B. ESPERANCA MC 500 kV TR 500/230 kV B. ESPERANCA TR1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RMEL REN 443/2011 6/4/2016 6/3/2046 32,003.56
  B. ESPERANCA MC 500 kV TR 500/230 kV B. ESPERANCA TR1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  B. ESPERANCA MC 500 kV TR 500/230 kV B. ESPERANCA TR1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,697.68
  B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RMEL REN 643/2014 20/08/2014 19/08/2031 23,745.13
  B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RMEL REN 643/2014 8/11/2015 8/10/2040 206,696.60
  B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RMEL REN 443/2011 13/01/2016 1/12/2033 27,427.35
  B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,164,756.08
  B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,104,543.88
  B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,574,519.48
  B. ESPERANCA RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI RB FT RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 618,815.61
  B. ESPERANCA RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI RB FT RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 586,825.87
  B. ESPERANCA RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI RB FT RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 206,196.72
  B. ESPERANCA RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI RB FT RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 195,537.36
  B. ESPERANCA RTB 500 kV 33,3 Mvar B. ESPERANCA RTR2 PI RB FT RTB 500 kV 33,3 Mvar B. ESPERANCA RTR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 206,196.72
  B. ESPERANCA RTB 500 kV 33,3 Mvar B. ESPERANCA RTR2 PI RB FT RTB 500 kV 33,3 Mvar B. ESPERANCA RTR2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 195,537.36
  B. ESPERANCA RTB 500 kV 33,3 Mvar B. ESPERANCA RTR2 PI RB FT RTB 500 kV 33,3 Mvar B. ESPERANCA RTR2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 632,797.05
  B. ESPERANCA RTL 500 kV 100 Mvar B. ESPERANCA RT1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 618,815.61
  B. ESPERANCA RTL 500 kV 100 Mvar B. ESPERANCA RT1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 586,825.87
  B. ESPERANCA RTL 500 kV 100 Mvar B. ESPERANCA RT2 PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RMEL REN 643/2014 30/01/2014 29/01/2049 9,294.23
  B. ESPERANCA RTL 500 kV 100 Mvar B. ESPERANCA RT2 PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 618,815.61
  B. ESPERANCA RTL 500 kV 100 Mvar B. ESPERANCA RT2 PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 586,825.87
  B. ESPERANCA RTS 13,8 kV 5 Mvar B. ESPERANCA RT1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  B. ESPERANCA RTS 13,8 kV 5 Mvar B. ESPERANCA RT1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  B. ESPERANCA TR 500/230 kV B. ESPERANCA TR1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,335,221.55
  B. ESPERANCA TR 500/230 kV B. ESPERANCA TR1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,266,197.12
  B. ESPERANCA TR 500/230 kV B. ESPERANCA TR1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,097,660.89
  B. ESPERANCA TR 500/230 kV B. ESPERANCA TRR1 PI RB FT TR 500/230 kV B. ESPERANCA TRR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 445,073.85
  B. ESPERANCA TR 500/230 kV B. ESPERANCA TRR1 PI RB FT TR 500/230 kV B. ESPERANCA TRR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 422,065.71
  B. ESPERANCA TR 500/230 kV B. ESPERANCA TRR1 PI RB FT TR 500/230 kV B. ESPERANCA TRR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,365,886.96
  B.J.LAPA II EL 230 kV B.J.LAPA II LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA RB FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040 259,122.32
  B.JESUS LAPA CR 230 kV 34,9 MVAr B.JESUS LAPA BC1 BA RB FT CR 230 kV 34,9 MVAr B.JESUS LAPA BC1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,712.45
  B.JESUS LAPA CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 752,929.14
  B.JESUS LAPA CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 714,006.39
  B.JESUS LAPA CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,310,663.95
  B.JESUS LAPA CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBNI REA 5861/2016 30/06/2013 29/06/2042 84,123.22
  B.JESUS LAPA EL 230 kV B.JESUS LAPA LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA RB FT LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  B.JESUS LAPA EL 230 kV B.JESUS LAPA LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA RB FT LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  B.JESUS LAPA EL 230 kV B.JESUS LAPA LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA RB FT LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  B.JESUS LAPA EL 230 kV B.JESUS LAPA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RMEL REN 443/2011 7/9/2017 7/8/2047 40,434.97
  B.JESUS LAPA EL 230 kV B.JESUS LAPA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST1 DIT   061/2001 IPCA RMEL REN 443/2011 22/11/2015 21/11/2045 7,412.64
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST3 DIT   061/2001 IPCA RMEL REN 443/2011 30/08/2015 29/08/2045 7,364.86
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST3 DIT   061/2001 IPCA RMEL REN 443/2011 30/08/2015 29/08/2045 7,364.86
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  B.JESUS LAPA IB 230 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  B.JESUS LAPA IB 230 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 100,801.10
  B.JESUS LAPA IB 230 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 326,212.02
  B.JESUS LAPA IB 69 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  B.JESUS LAPA IB 69 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 DIT   061/2001 IPCA RCDM REA 6168/2017 5/12/2021 5/12/2052 35,766.83
  B.JESUS LAPA MC 13,8 kV CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,419.78
  B.JESUS LAPA MC 13,8 kV CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 52,554.84
  B.JESUS LAPA MC 13,8 kV CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 170,077.73
  B.JESUS LAPA MC 13,8 kV RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  B.JESUS LAPA MC 13,8 kV RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  B.JESUS LAPA MC 13,8 kV TR 13,8/0,22 kV B.JESUS LAPA TR5 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  B.JESUS LAPA MC 13,8 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  B.JESUS LAPA MC 13,8 kV TR 230/69 kV B.JESUS LAPA TR2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  B.JESUS LAPA MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,896.88
  B.JESUS LAPA MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 122,233.54
  B.JESUS LAPA MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 395,571.59
  B.JESUS LAPA MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RMEL REN 443/2011 6/2/2017 6/1/2047 20,163.38
  B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 79,937.26
  B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 258,692.58
  B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 79,937.26
  B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 258,692.58
  B.JESUS LAPA MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RMEL REN 443/2011 19/05/2017 18/05/2047 60,428.70
  B.JESUS LAPA MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  B.JESUS LAPA MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  B.JESUS LAPA MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03

 

41 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA T5 BA RBF FT TR 230/69 kV B.JESUS LAPA T5 BA 061/2001 IPCA RBNI REA 6168/2017 16/12/2019 16/12/2042 590,853.95
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RMEL REN 443/2011 21/05/2017 20/05/2047 60,437.48
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR4 BA RBF FT TR 230/69 kV B.JESUS LAPA TR4 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042 933,483.71
  B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA T5 BA RBF FT TR 230/69 kV B.JESUS LAPA T5 BA 061/2001 IPCA RBNI REA 6168/2017 16/12/2019 16/12/2042 274,596.17
  B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR4 BA RBF FT TR 230/69 kV B.JESUS LAPA TR4 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042 363,802.05
  B.JESUS LAPA MC 69 kV TT 69/0 kV B.JESUS LAPA TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  B.JESUS LAPA MC 69 kV TT 69/13,8 kV B.JESUS LAPA TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 532,402.69
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 504,880.08
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,633,890.42
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBNI REA 6168/2017 5/12/2021 5/12/2053 60,366.03
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBNI REA 6168/2017 5/12/2021 5/12/2052 15,875.20
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBNI REA 6168/2017 5/12/2021 5/12/2061 47,509.40
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBNI REA 6168/2017 5/12/2021 5/12/2061 81,792.33
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RMEL REN 643/2014 23/01/2014 22/01/2031 14,098.79
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RMEL REN 643/2014 28/11/2014 27/11/2031 14,689.64
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2013 19/12/2027 447,696.79
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 78,689.64
  B.JESUS LAPA RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  B.JESUS LAPA RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  B.JESUS LAPA RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  B.JESUS LAPA RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  B.JESUS LAPA RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 176,208.84
  B.JESUS LAPA RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RMEL REN 443/2011 13/09/2017 9/12/2052 24,831.48
  B.JESUS LAPA RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 217,318.67
  B.JESUS LAPA RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 206,084.35
  B.JESUS LAPA RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 217,318.67
  B.JESUS LAPA RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 206,084.35
  B.JESUS LAPA RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA RB FT RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 72,439.56
  B.JESUS LAPA RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA RB FT RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 68,694.78
  B.JESUS LAPA RTS 69 kV 40 Mvar B.JESUS LAPA RT2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,319.34
  B.JESUS LAPA TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 292,864.11
  B.JESUS LAPA TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 277,724.47
  B.JESUS LAPA TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 898,770.55
  B.JESUS LAPA TR 230/69 kV B.JESUS LAPA T5 BA RBF FT TR 230/69 kV B.JESUS LAPA T5 BA 061/2001 IPCA RBNI REA 6168/2017 16/12/2019 16/12/2053 1,388,500.54
  B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 226,840.77
  B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,248.83
  B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RMEL REN 443/2011 27/05/2017 26/05/2051 24,754.79
  B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 191,938.38
  B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 182,016.10
  B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR4 BA RBF FT TR 230/69 kV B.JESUS LAPA TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,471.60
  B.JESUS LAPA TR 69/69 kV B.JESUS LAPA TREG2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,394.59
  B.JESUS LAPA TR 69/69 kV B.JESUS LAPA TREG4 BA RBF FT TR 230/69 kV B.JESUS LAPA TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,394.59
  B.JESUS LAPA TT 69/0 kV B.JESUS LAPA TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  B.JESUS LAPA TT 69/13,8 kV B.JESUS LAPA TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  B.JESUS LAPA TT 69/13,8 kV B.JESUS LAPA TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,846.49
  BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 166,756.08
  BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 539,655.22
  BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,846.49
  BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 166,756.08
  BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 539,655.22
  BANABUIU EL 13,8 kV BANABUIU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  BANABUIU EL 230 kV BANABUIU  LIBRA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 192,089.95
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB   061/2001 IPCA RBNI REA 2823/2011 29/07/2019 29/07/2053 405,586.46
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB   061/2001 IPCA RBNI REA 2823/2011 10/2/2020 10/2/2054 330,391.22
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB   061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB   061/2001 IPCA RBNI REA 3631/2012 11/6/2020 11/6/2045 125,918.40
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /FORTALEZA C-3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /ICO C-1 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN 061/2001 IPCA RBNI REA 2173/2009 6/6/2016 6/5/2046 1,131,146.69
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /RUSSAS II C-1 CE RB FT LT 230 kV BANABUIU /RUSSAS II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BANABUIU EL 230 kV BANABUIU LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BANABUIU EL 230 kV BANABUIU LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RMEL REN 643/2014 26/11/2013 25/11/2041 34,283.34
  BANABUIU EL 230 kV BANABUIU LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BANABUIU EL 230 kV BANABUIU LT 230 kV RUSSAS II /BANABUIU C-2 CE RB FT LT 230 kV RUSSAS II /BANABUIU C-1 CE 018/2012 IPCA RBL CC 018/2012 15/12/2020 6/1/2042 441,712.23
  BANABUIU EL 69 kV BANABUIU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BANABUIU EL 69 kV BANABUIU  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BANABUIU EL 69 kV BANABUIU  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BANABUIU EL 69 kV BANABUIU  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BANABUIU EL 69 kV BANABUIU  DIST5 DIT   061/2001 IPCA RCDM REA 3817/2013 15/07/2013 14/07/2041 26,737.07
  BANABUIU EL 69 kV BANABUIU  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BANABUIU EL 69 kV BANABUIU  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BANABUIU EL 69 kV BANABUIU  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  BANABUIU EL 69 kV BANABUIU  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  BANABUIU EL 69 kV BANABUIU  DIST6 DIT   061/2001 IPCA RCDM REA 5484/2015 16/08/2020 15/08/2050 33,282.94
  BANABUIU EL 69 kV BANABUIU  DIST6 DIT   061/2001 IPCA RCDM REA 3817/2013 15/07/2013 14/07/2041 26,737.07
  BANABUIU IB 230 kV MG 230 kV BANABUIU MG1 CE IB1 RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  BANABUIU IB 230 kV MG 230 kV BANABUIU MG1 CE IB1 RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 100,801.10
  BANABUIU IB 230 kV MG 230 kV BANABUIU MG1 CE IB1 RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 326,212.02
  BANABUIU IB 69 kV MG 230 kV BANABUIU MG1 CE IB1 DIT   061/2001 IPCA RCDM REA 5809/2016 7/6/2020 7/6/2048 163,450.63
  BANABUIU IB 69 kV MG 230 kV BANABUIU MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  BANABUIU MC 13,8 kV TR 69/13,8 kV BANABUIU TR7 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  BANABUIU MC 13,8 kV TR 69/13,8 kV BANABUIU TR7 CE DIT   061/2001 IPCA RMEL REN 443/2011 12/8/2017 12/7/2049 23,597.38
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RMEL REN 443/2011 14/07/2017 13/07/2049 106,806.34
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 153,015.11
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 145,104.98
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 469,588.01
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 153,015.11
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 145,104.98
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 469,588.01
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RMEL REN 443/2011 16/05/2017 15/05/2049 106,379.21
  BANABUIU MC 230 kV RTB 230 kV 20 MVAr BANABUIU RT4 CE RB FT RTB 230 kV 20 MVAr BANABUIU RT4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,896.88
  BANABUIU MC 230 kV TR 230/69 kV BANABUIU TR1 CE RBF FT TR 230/69 kV BANABUIU TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43

 

42 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  BANABUIU MC 230 kV TR 230/69 kV BANABUIU TR2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BANABUIU MC 230 kV TR 230/69 kV BANABUIU TR2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBNI REA 5809/2016 13/06/2020 13/06/2043 604,735.52
  BANABUIU MC 230 kV TR 230/69 kV BANABUIU TR3 CE RBF FT TR 230/69 kV BANABUIU TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BANABUIU MC 230 kV TR 230/69 kV BANABUIU TR4 CE RBF FT TR 230/69 kV BANABUIU TR4 CE 061/2001 IPCA RBNI REA 2823/2011 23/09/2019 23/09/2053 213,234.22
  BANABUIU MC 69 kV TR 230/69 kV BANABUIU TR1 CE RBF FT TR 230/69 kV BANABUIU TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  BANABUIU MC 69 kV TR 230/69 kV BANABUIU TR2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  BANABUIU MC 69 kV TR 230/69 kV BANABUIU TR2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBNI REA 5809/2016 13/06/2020 13/06/2042 261,145.76
  BANABUIU MC 69 kV TR 230/69 kV BANABUIU TR3 CE RBF FT TR 230/69 kV BANABUIU TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  BANABUIU MC 69 kV TR 230/69 kV BANABUIU TR4 CE RBF FT TR 230/69 kV BANABUIU TR4 CE 061/2001 IPCA RBNI REA 2823/2011 23/09/2019 23/09/2053 214,547.16
  BANABUIU MC 69 kV TR 69/13,8 kV BANABUIU TR7 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,615.66
  BANABUIU MC 69 kV TT 69/0 kV BANABUIU TT2 CE DIT   061/2001 IPCA RCDM REA 5809/2016 7/6/2020 7/6/2040 112,136.22
  BANABUIU MG 230 kV BANABUIU MG1 CE RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBNI REA 2823/2011 23/09/2019 23/09/2052 67,396.52
  BANABUIU MG 230 kV BANABUIU MG1 CE RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 650,632.68
  BANABUIU MG 230 kV BANABUIU MG1 CE RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBNI REA 5809/2016 7/5/2020 7/5/2051 16,347.86
  BANABUIU MG 230 kV BANABUIU MG1 CE RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RMEL REN 643/2014 19/09/2013 18/09/2030 27,715.74
  BANABUIU MG 230 kV BANABUIU MG1 CE RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RMEL REN 443/2011 30/09/2016 29/09/2033 28,924.49
  BANABUIU RTB 230 kV 20 MVAr BANABUIU RT4 CE RB FT RTB 230 kV 20 MVAr BANABUIU RT4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 198,548.97
  BANABUIU RTB 230 kV 3,33 MVAr BANABUIU RTR1 CE RB FT RTB 230 kV 3,33 MVAr BANABUIU RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,047.53
  BANABUIU RTL 230 kV 10 Mvar BANABUIU RT1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  BANABUIU RTL 230 kV 10 MVAr BANABUIU RT2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  BANABUIU RTL 230 kV 10 MVAr BANABUIU RT2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 142,537.77
  BANABUIU RTL 230 kV 10 MVAr BANABUIU RT2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 461,280.03
  BANABUIU RTL 230 kV 10 MVAr BANABUIU RT3 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  BANABUIU RTL 230 kV 10 MVAr BANABUIU RT3 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 142,537.77
  BANABUIU RTS 13,8 kV 18,75 Mvar BANABUIU RT1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 144,668.20
  BANABUIU RTS 69 kV 40 MVAr BANABUIU RT1 CE RBF FT TR 230/69 kV BANABUIU TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,319.34
  BANABUIU RTS 69 kV 40 MVAr BANABUIU RT2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,319.34
  BANABUIU RTS 69 kV 40 MVAr BANABUIU RT2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 156,773.14
  BANABUIU RTS 69 kV 40 MVAr BANABUIU RT2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 507,348.46
  BANABUIU TR 230/69 kV BANABUIU TR1 CE RBF FT TR 230/69 kV BANABUIU TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,471.60
  BANABUIU TR 230/69 kV BANABUIU TR2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBNI REA 5809/2016 13/06/2020 13/06/2054 1,433,321.29
  BANABUIU TR 230/69 kV BANABUIU TR2D CE RBF FT TR 230/69 kV BANABUIU TR2D CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,471.60
  BANABUIU TR 230/69 kV BANABUIU TR3 CE RBF FT TR 230/69 kV BANABUIU TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 226,840.77
  BANABUIU TR 230/69 kV BANABUIU TR4 CE RBF FT TR 230/69 kV BANABUIU TR4 CE 061/2001 IPCA RBNI REA 2823/2011 23/09/2019 23/09/2059 1,235,426.03
  BANABUIU TR 69/13,8 kV BANABUIU TR4 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  BANABUIU TR 69/13,8 kV BANABUIU TR7 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  BANABUIU TT 69/0 kV BANABUIU TT2 CE DIT   061/2001 IPCA RCDM REA 5809/2016 7/6/2020 7/6/2050 235,319.45
  BANABUIU TT 69/13,8 kV BANABUIU TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  BARREIRAS EL 138 kV BARREIRAS  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  BARREIRAS EL 138 kV BARREIRAS  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  BARREIRAS EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBNI REA 5861/2016 19/04/2014 18/04/2042 31,895.73
  BARREIRAS EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BARREIRAS EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  BARREIRAS EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  BARREIRAS EL 69 kV BARREIRAS  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BARREIRAS EL 69 kV BARREIRAS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  BARREIRAS EL 69 kV BARREIRAS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  BARREIRAS EL 69 kV BARREIRAS  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BARREIRAS EL 69 kV BARREIRAS  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  BARREIRAS EL 69 kV BARREIRAS  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  BARREIRAS EL 69 kV BARREIRAS  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BARREIRAS EL 69 kV BARREIRAS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  BARREIRAS EL 69 kV BARREIRAS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  BARREIRAS EL 69 kV BARREIRAS  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BARREIRAS EL 69 kV BARREIRAS  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  BARREIRAS EL 69 kV BARREIRAS  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  BARREIRAS IB 138 kV MG 230 kV BARREIRAS MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,407.76
  BARREIRAS IB 230 kV MG 230 kV BARREIRAS MG1 BA IB1 RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  BARREIRAS IB 230 kV MG 230 kV BARREIRAS MG1 BA IB1 RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RBNI REA 5824/2016 14/11/2018 14/11/2051 85,547.40
  BARREIRAS IB 69 kV MG 230 kV BARREIRAS MG1 BA IB3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  BARREIRAS MC 138 kV TR 230/138 kV BARREIRAS TR3 BA RBF FT TR 230/138 kV BARREIRAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  BARREIRAS MC 138 kV TR 230/138 kV BARREIRAS TR4 BA RBF FT TR 230/138 kV BARREIRAS TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  BARREIRAS MC 230 kV RTB 230 kV 10 Mvar BARREIRAS RT2 BA RB FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  BARREIRAS MC 230 kV RTB 230 kV 10 Mvar BARREIRAS RT2 BA RB FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA 061/2001 IPCA RBNI REA 5824/2016 10/12/2018 10/12/2040 368,820.00
  BARREIRAS MC 230 kV TR 230/138 kV BARREIRAS TR3 BA RBF FT TR 230/138 kV BARREIRAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BARREIRAS MC 230 kV TR 230/138 kV BARREIRAS TR4 BA RBF FT TR 230/138 kV BARREIRAS TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BARREIRAS MC 230 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BARREIRAS MC 230 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  BARREIRAS MC 230 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  BARREIRAS MC 230 kV TR 230/69 kV BARREIRAS TR2 BA RBF FT TR 230/69 kV BARREIRAS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BARREIRAS MC 69 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  BARREIRAS MC 69 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  BARREIRAS MC 69 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  BARREIRAS MC 69 kV TR 230/69 kV BARREIRAS TR2 BA RBF FT TR 230/69 kV BARREIRAS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  BARREIRAS MC 69 kV TT 69/13,8 kV BARREIRAS TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 550,742.49
  BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 522,271.79
  BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,690,173.40
  BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 14/02/2014 13/02/2031 23,660.67
  BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2013 19/12/2027 23,116.59
  BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 12/9/2015 12/8/2032 27,899.68
  BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 31/03/2015 30/03/2043 44,090.87
  BARREIRAS RTB 230 kV 10 Mvar BARREIRAS RT2 BA RB FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  BARREIRAS RTB 230 kV 10 Mvar BARREIRAS RT2 BA RB FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 142,537.77
  BARREIRAS RTB 230 kV 10 Mvar BARREIRAS RT2 BA RB FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 461,280.03
  BARREIRAS TR 230/138 kV BARREIRAS TR3 BA RBF FT TR 230/138 kV BARREIRAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,278.01
  BARREIRAS TR 230/138 kV BARREIRAS TR4 BA RBF FT TR 230/138 kV BARREIRAS TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,278.01
  BARREIRAS TR 230/138 kV BARREIRAS TRR1 BA RBF FT TR 230/138 kV BARREIRAS TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 176,342.85
  BARREIRAS TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  BARREIRAS TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  BARREIRAS TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  BARREIRAS TR 230/69 kV BARREIRAS TR2 BA RBF FT TR 230/69 kV BARREIRAS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  BARREIRAS TT 69/13,8 kV BARREIRAS TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  BARREIRAS II EL 230 kV BARREIRAS II LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBNI REA 9680/2021 19/11/2019 18/11/2047 131,990.95
  BARREIRAS II EL 230 kV BARREIRAS II LT 230 kV Tabocas do Brejo Velho /BARREIRAS II C-1 BA RB FT LT 230 kV Tabocas do Brejo Velho /BARREIRAS II C-1 BA 061/2001 IPCA RBNI REA 9680/2021 19/11/2019 18/11/2047 131,990.95
  BARREIRAS II MC 230 kV RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBNI REA 5824/2016 6/11/2019 6/11/2037 232,623.51
  BARREIRAS II MC 230 kV RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  BARREIRAS II MC 230 kV RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 79,937.26
  BARREIRAS II MG 230 kV BARREIRAS II MG2 BA RB FT MG 230 kV BARREIRAS II MG2 BA 061/2001 IPCA RBNI REA 5824/2016 6/11/2019 6/11/2038 342,642.72
  BARREIRAS II MG 230 kV BARREIRAS II MG2 BA RB FT MG 230 kV BARREIRAS II MG2 BA 061/2001 IPCA RBNI REA 5824/2016 6/11/2019 6/11/2049 14,082.74
  BARREIRAS II RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  BARREIRAS II RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 142,537.77
  BARREIRAS II RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 461,280.03
  BARREIRAS II RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBNI REA 5824/2016 6/11/2019 6/11/2051 298,365.77
  BARREIRAS II RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA RB FT RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA 061/2001 IPCA RBNI REA 5824/2016 6/11/2019 6/11/2051 99,455.25
  BARREIRAS II RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA RB FT RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,047.53
  BARREIRAS II RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA RB FT RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 47,460.32
  BARREIRAS II RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA RB FT RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 153,590.86
  BOM NOME EL 13,8 kV BOM NOME  01Y1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  BOM NOME EL 13,8 kV BOM NOME  01Y2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38

 

43 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  BOM NOME EL 13,8 kV BOM NOME  01Y3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  BOM NOME EL 138 kV BOM NOME  FLORES-03C1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  BOM NOME EL 138 kV BOM NOME  SALGUEIRO 03C2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  BOM NOME EL 138 kV BOM NOME  SALGUEIRO-03C3 DIT   061/2001 IPCA RCDM REA 3229/2011 30/01/2013 29/01/2043 799,353.37
  BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-1 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 643/2014 9/10/2013 9/9/2046 93,116.70
  BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-1 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RMEL REN 643/2014 7/2/2015 7/1/2045 2,627.29
  BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  BOM NOME EL 230 kV BOM NOME LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BOM NOME EL 230 kV BOM NOME LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  BOM NOME EL 230 kV BOM NOME LT 230 kV SE Floresta II /BOM NOME C-2 PE RB FT LT 230 kV SE Floresta II /BOM NOME C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BOM NOME EL 230 kV BOM NOME LT 230 kV SE Floresta II /BOM NOME C-2 PE RB FT LT 230 kV SE Floresta II /BOM NOME C-2 PE 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2046 93,255.64
  BOM NOME EL 230 kV BOM NOME LT 230 kV TACARUTU /BOM NOME C-1 PE RB FT LT 230 kV TACARUTU /BOM NOME C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BOM NOME EL 69 kV BOM NOME  SALGUEIRO DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BOM NOME EL 69 kV BOM NOME  SERRA TALHADA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BOM NOME EL 69 kV BOM NOME  VAGO (CELPE) DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BOM NOME EL 69 kV BOM NOME  VAGO1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BOM NOME IB 138 kV MG 230 kV BOM NOME MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,407.76
  BOM NOME IB 230 kV MG 230 kV BOM NOME MG1 PE IB1 RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  BOM NOME IB 230 kV MG 230 kV BOM NOME MG1 PE IB1 RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 100,801.10
  BOM NOME IB 230 kV MG 230 kV BOM NOME MG1 PE IB1 RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 326,212.02
  BOM NOME IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 DIT   061/2001 IPCA RCDM REA 5166/2015 6/6/2018 6/6/2049 26,867.38
  BOM NOME IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  BOM NOME IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  BOM NOME IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  BOM NOME MC 13,8 kV TR 69/13,8 kV BOM NOME TR3A PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  BOM NOME MC 13,8 kV TR 69/13,8 kV BOM NOME TR3A PE DIT   061/2001 IPCA RCDM REA 2040/2009 30/09/2012 29/09/2042 7,825.16
  BOM NOME MC 138 kV TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  BOM NOME MC 138 kV TR 230/138 kV BOM NOME TR5 PE RBF FT TR 230/138 kV BOM NOME TR5 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  BOM NOME MC 138 kV TR 230/138 kV BOM NOME TR6 PE RBF FT TR 230/138 kV BOM NOME TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  BOM NOME MC 230 kV TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BOM NOME MC 230 kV TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  BOM NOME MC 230 kV TR 230/138 kV BOM NOME TR5 PE RBF FT TR 230/138 kV BOM NOME TR5 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BOM NOME MC 230 kV TR 230/138 kV BOM NOME TR6 PE RBF FT TR 230/138 kV BOM NOME TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BOM NOME MC 230 kV TR 230/69 kV BOM NOME TR1 PE RBF FT TR 230/69 kV BOM NOME TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BOM NOME MC 230 kV TR 230/69 kV BOM NOME TR2 PE RBF FT TR 230/69 kV BOM NOME TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BOM NOME MC 230 kV TR 230/69 kV BOM NOME TR2 PE RBF FT TR 230/69 kV BOM NOME TR2 PE 061/2001 IPCA RMEL REN 643/2014 20/09/2013 19/09/2046 93,186.16
  BOM NOME MC 69 kV TR 230/69 kV BOM NOME TR1 PE RBF FT TR 230/69 kV BOM NOME TR1 PE 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2047 174,914.34
  BOM NOME MC 69 kV TR 230/69 kV BOM NOME TR1 PE RBF FT TR 230/69 kV BOM NOME TR1 PE 061/2001 IPCA RMEL REN 643/2014 24/05/2013 23/05/2046 27,305.09
  BOM NOME MC 69 kV TR 230/69 kV BOM NOME TR1 PE RBF FT TR 230/69 kV BOM NOME TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  BOM NOME MC 69 kV TR 230/69 kV BOM NOME TR2 PE RBF FT TR 230/69 kV BOM NOME TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  BOM NOME MC 69 kV TR 230/69 kV BOM NOME TR2 PE RBF FT TR 230/69 kV BOM NOME TR2 PE 061/2001 IPCA RBNI REA 5166/2015 2/8/2018 2/7/2039 176,869.99
  BOM NOME MC 69 kV TR 69/13,8 kV BOM NOME TR3A PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,615.66
  BOM NOME MC 69 kV TR 69/13,8 kV BOM NOME TR3B PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,713.10
  BOM NOME MC 69 kV TT 69/13,8 kV BOM NOME TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 682,960.28
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBNI REA 3229/2011 30/01/2013 29/01/2041 107,024.54
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 647,654.57
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,095,936.54
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBNI REA 5166/2015 6/6/2018 6/6/2058 207,204.32
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBNI REA 5166/2015 6/6/2018 6/6/2051 96,564.65
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 643/2014 31/01/2015 30/01/2043 43,874.52
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 643/2014 19/07/2013 18/07/2030 22,988.80
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/12/2013 29/12/2041 71,548.02
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 643/2014 17/12/2015 16/12/2032 30,847.78
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 443/2011 3/5/2016 3/4/2030 41,216.49
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 28,817.16
  BOM NOME TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,278.01
  BOM NOME TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 322,687.30
  BOM NOME TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,044,279.05
  BOM NOME TR 230/138 kV BOM NOME TR5 PE RBF FT TR 230/138 kV BOM NOME TR5 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,278.01
  BOM NOME TR 230/138 kV BOM NOME TR6 PE RBF FT TR 230/138 kV BOM NOME TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,278.01
  BOM NOME TR 230/69 kV BOM NOME TR1 PE RBF FT TR 230/69 kV BOM NOME TR1 PE 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2051 1,283,540.03
  BOM NOME TR 230/69 kV BOM NOME TR2 PE RBF FT TR 230/69 kV BOM NOME TR2 PE 061/2001 IPCA RBNI REA 5166/2015 2/8/2018 2/7/2053 1,204,468.06
  BOM NOME TR 69/13,8 kV BOM NOME TR3A PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  BOM NOME TR 69/13,8 kV BOM NOME TR3B PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  BOM NOME TT 69/13,8 kV BOM NOME TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  BONGI BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,472.99
  BONGI BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2033 87,124.61
  BONGI EL 13,8 kV BONGI  DIS10 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  BONGI EL 13,8 kV BONGI  DIS11 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  BONGI EL 13,8 kV BONGI  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  BONGI EL 13,8 kV BONGI  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  BONGI EL 13,8 kV BONGI  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  BONGI EL 13,8 kV BONGI  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  BONGI EL 13,8 kV BONGI  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  BONGI EL 13,8 kV BONGI  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  BONGI EL 13,8 kV BONGI  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  BONGI EL 13,8 kV BONGI  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  BONGI EL 13,8 kV BONGI  DIST9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  BONGI EL 230 kV BONGI LT 230 kV BONGI /ACONORTE C-1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 192,089.95
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-1 PE RB FT LT 230 kV BONGI /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-1 PE RB FT LT 230 kV BONGI /JOAIRAM C-1 PE 061/2001 IPCA RMEL REN 443/2011 19/11/2017 18/11/2049 107,733.01
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-1 PE RB FT LT 230 kV BONGI /JOAIRAM C-1 PE 061/2001 IPCA RMEL REN 443/2011 4/7/2016 4/6/2046 1,567.96
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-2 PE RB FT LT 230 kV BONGI /JOAIRAM C-2 PE 061/2001 IPCA RMEL REN 443/2011 4/8/2016 4/7/2046 1,200.92
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-2 PE RB FT LT 230 kV BONGI /JOAIRAM C-2 PE 061/2001 IPCA RMEL REN 443/2011 12/10/2017 12/9/2049 107,885.03
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-2 PE RB FT LT 230 kV BONGI /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-3 PE RB FT LT 230 kV BONGI /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-3 PE RB FT LT 230 kV BONGI /JOAIRAM C-3 PE 061/2001 IPCA RMEL REN 443/2011 4/8/2016 4/7/2046 1,568.09
  BONGI EL 69 kV BONGI  GAZ 02L5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BONGI EL 69 kV BONGI  GAZ-PINA 02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BONGI EL 69 kV BONGI  GAZ-PINA 02J7 DIT   061/2001 IPCA RCDM REA 1814/2009 11/1/2013 31/10/2045 31,946.48
  BONGI EL 69 kV BONGI  GAZ-PINA 02J7 DIT   061/2001 IPCA RCDM REA 1814/2009 27/09/2014 26/09/2044 13,182.70
  BONGI EL 69 kV BONGI  GAZ-PORT 02L6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BONGI EL 69 kV BONGI  IMBIRI 02L1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BONGI EL 69 kV BONGI  IMBIRI 02L1 DIT   061/2001 IPCA RMEL REN 643/2014 28/05/2015 27/05/2045 494.01
  BONGI EL 69 kV BONGI  IMBIRI 02L2 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046 29,091.26
  BONGI EL 69 kV BONGI  IMBIRI 02L2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BONGI EL 69 kV BONGI  IMBIRI 02L2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  BONGI EL 69 kV BONGI  IMBIRI 02L2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  BONGI EL 69 kV BONGI  RETIRO 02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BONGI EL 69 kV BONGI  RETIRO 02J1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  BONGI EL 69 kV BONGI  RETIRO 02J1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  BONGI EL 69 kV BONGI  RETIRO 02J1 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2046 29,091.26
  BONGI EL 69 kV BONGI  RETIRO 02J1 DIT   061/2001 IPCA RMEL REN 643/2014 25/05/2015 24/05/2029 361.13
  BONGI EL 69 kV BONGI  RIO JORDAO 02J5 DIT   061/2001 IPCA RCDM REA 1814/2009 12/12/2013 12/11/2045 32,044.27
  BONGI EL 69 kV BONGI  RIO JORDAO 02J5 DIT   061/2001 IPCA RCDM REA 1814/2009 8/3/2014 8/2/2044 13,125.22
  BONGI EL 69 kV BONGI  RIO JORDAO 02J5 DIT   061/2001 IPCA RCDM REA 2376/2010 14/09/2014 13/09/2044 26,682.07

 

44 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  BONGI EL 69 kV BONGI  RIO JORDAO 02J5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BONGI EL 69 kV BONGI  TAMARIN 02J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BONGI EL 69 kV BONGI  TAMARIN 02J2 DIT   061/2001 IPCA RMEL REN 643/2014 26/05/2015 25/05/2029 361.18
  BONGI EL 69 kV BONGI  TAMARIN 02J2 DIT   061/2001 IPCA RMEL REN 443/2011 18/04/2016 17/04/2046 734.87
  BONGI EL 69 kV BONGI  TAMARIN 02J2 DIT   061/2001 IPCA RCDM REA 1814/2009 12/12/2013 12/11/2045 32,044.27
  BONGI EL 69 kV BONGI  VARZEA 02J3 DIT   061/2001 IPCA RCDM REA 2040/2009 25/02/2014 24/02/2046 32,223.16
  BONGI EL 69 kV BONGI  VARZEA 02J3 DIT   061/2001 IPCA RMEL REN 643/2014 27/05/2015 26/05/2029 361.23
  BONGI EL 69 kV BONGI  VARZEA 02J3 DIT   061/2001 IPCA RMEL REN 643/2014 28/05/2015 27/05/2029 361.27
  BONGI EL 69 kV BONGI  VARZEA 02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BONGI EL 69 kV BONGI  VARZEA 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  BONGI EL 69 kV BONGI  VARZEA 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  BONGI EL 69 kV BONGI  VARZEA 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  BONGI EL 69 kV BONGI  VARZEA 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  BONGI EL 69 kV BONGI  VARZEA 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  BONGI EL 69 kV BONGI  VARZEA 02J4 DIT   061/2001 IPCA RCDM REA 2376/2010 14/09/2014 13/09/2044 26,682.07
  BONGI EL 69 kV BONGI  VARZEA 02J4 DIT   061/2001 IPCA RCDM REA 1814/2009 18/11/2013 17/11/2045 31,987.03
  BONGI IB 13,8 kV MG 230 kV BONGI MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,720.57
  BONGI IB 13,8 kV MG 230 kV BONGI MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 27,424.24
  BONGI IB 230 kV MG 230 kV BONGI MG1 PE IB1 RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  BONGI IB 230 kV MG 230 kV BONGI MG1 PE IB1 RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 26/07/2017 25/07/2047 364.29
  BONGI IB 230 kV MG 230 kV BONGI MG1 PE IB1 RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 26/07/2017 25/07/2047 364.29
  BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  BONGI MC 13,8 kV TR 13,8/0,22 kV BONGI TR2 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  BONGI MC 13,8 kV TR 13,8/0,22 kV BONGI TR3 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  BONGI MC 13,8 kV TR 230/13,8 kV BONGI TR5 PE RBF FT TR 230/13,8 kV BONGI TR5 PE 061/2001 IPCA RBNI REA 3402/2012 14/01/2016 13/01/2047 339,254.00
  BONGI MC 13,8 kV TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  BONGI MC 13,8 kV TR 230/13,8 kV BONGI TR7 PE RBF FT TR 230/13,8 kV BONGI TR7 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  BONGI MC 230 kV TR 230/13,8 kV BONGI TR5 PE RBF FT TR 230/13,8 kV BONGI TR5 PE 061/2001 IPCA RBNI REA 3402/2012 14/01/2016 13/01/2046 1,012,744.61
  BONGI MC 230 kV TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BONGI MC 230 kV TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  BONGI MC 230 kV TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RMEL REN 643/2014 16/02/2014 15/02/2044 55,216.48
  BONGI MC 230 kV TR 230/13,8 kV BONGI TR7 PE RBF FT TR 230/13,8 kV BONGI TR7 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BONGI MC 230 kV TR 230/69 kV BONGI TR1 PE RBF FT TR 230/69 kV BONGI TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BONGI MC 230 kV TR 230/69 kV BONGI TR2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BONGI MC 230 kV TR 230/69 kV BONGI TR3 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BONGI MC 230 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  BONGI MC 230 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  BONGI MC 230 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  BONGI MC 230 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RMEL REN 443/2011 6/4/2017 6/3/2047 5,053.81
  BONGI MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RCDM REA 5861/2016 27/03/2015 26/03/2043 19,200.74
  BONGI MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  BONGI MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  BONGI MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  BONGI MC 69 kV TR 230/69 kV BONGI TR1 PE RBF FT TR 230/69 kV BONGI TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  BONGI MC 69 kV TR 230/69 kV BONGI TR1 PE RBF FT TR 230/69 kV BONGI TR1 PE 061/2001 IPCA RBNI REA 2040/2009 2/12/2014 2/11/2046 32,192.15
  BONGI MC 69 kV TR 230/69 kV BONGI TR2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBNI REA 2040/2009 28/03/2014 27/03/2046 32,297.09
  BONGI MC 69 kV TR 230/69 kV BONGI TR2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  BONGI MC 69 kV TR 230/69 kV BONGI TR3 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  BONGI MC 69 kV TR 230/69 kV BONGI TR3 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBNI REA 2040/2009 29/01/2014 28/01/2046 32,158.76
  BONGI MC 69 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  BONGI MC 69 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  BONGI MC 69 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 642,016.51
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 608,827.40
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,970,284.23
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBNI REA 3402/2012 14/01/2016 13/01/2044 233,869.78
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2030 176,021.51
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 28/03/2016 27/03/2030 26,078.47
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 28,817.16
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 18/11/2016 17/11/2033 30,189.67
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 6/6/2017 6/5/2047 363.84
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBNI REA 2376/2010 5/6/2012 5/5/2026 22,192.00
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBNI REA 2376/2010 5/6/2012 5/5/2045 19,414.91
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 643/2014 7/4/2013 7/3/2030 22,940.80
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 643/2014 9/6/2013 9/5/2030 27,666.03
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 643/2014 19/12/2015 18/12/2047 371,341.02
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 13,397.60
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBNI REA 1814/2009 1/1/2013 31/12/2045 29,027.10
  BONGI RTS 13,8 kV 5 MVAr BONGI RT1 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  BONGI RTS 13,8 kV 5 MVAr BONGI RT1 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  BONGI RTS 13,8 kV 5 MVAr BONGI RT1 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 353,089.34
  BONGI RTS 13,8 kV 5 MVAr BONGI RT2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  BONGI RTS 13,8 kV 5 MVAr BONGI RT2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  BONGI RTS 13,8 kV 5 MVAr BONGI RT2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 353,089.34
  BONGI TR 230/13,8 kV BONGI TR5 PE RBF FT TR 230/13,8 kV BONGI TR5 PE 061/2001 IPCA RBNI REA 3402/2012 14/01/2016 13/01/2050 921,064.48
  BONGI TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,494.87
  BONGI TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RMEL REN 443/2011 4/7/2016 4/6/2046 1,200.83
  BONGI TR 230/13,8 kV BONGI TR7 PE RBF FT TR 230/13,8 kV BONGI TR7 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,494.87
  BONGI TR 230/69 kV BONGI TR1 PE RBF FT TR 230/69 kV BONGI TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  BONGI TR 230/69 kV BONGI TR2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  BONGI TR 230/69 kV BONGI TR3 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  BONGI TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  BONGI TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  BONGI TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  BONGI TT 69/13,8 kV BONGI TA1 PE DIT   061/2001 IPCA RCDM REA 3578/2012 30/03/2015 29/03/2045 191,130.38
  BONGI TT 69/13,8 kV BONGI TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  BONGI TT 69/13,8 kV BONGI TA1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  BONGI TT 69/13,8 kV BONGI TA1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  BONGI TT 69/13,8 kV BONGI TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  BONGI TT 69/13,8 kV BONGI TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  BONGI TT 69/13,8 kV BONGI TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  BONGI TT 69/13,8 kV BONGI TA2 PE DIT   061/2001 IPCA RCDM REA 3578/2012 22/03/2015 21/03/2045 191,027.24
  BROT.MACAUBAS EL 230 kV BROT.MACAUBAS LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042 208,742.86
  BROT.MACAUBAS EL 230 kV BROT.MACAUBAS LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042 208,742.86
  BROT.MACAUBAS IB 230 kV MG 230 kV BROT.MACAUBAS MG1 BA IB1 RB FT MG 230 kV BROT.MACAUBAS MG1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042 127,894.56
  BROT.MACAUBAS MG 230 kV BROT.MACAUBAS MG1 BA RB FT MG 230 kV BROT.MACAUBAS MG1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042 367,171.31
  BRUMADO II EL 230 kV BRUMADO II LT 230 kV BRUMADO II /IBICOARA C-1 BA RB FT LT 230 kV BRUMADO II /IBICOARA C-1 BA 010/2007 IPCA RMEL REN 443/2011 26/10/2016 25/10/2031 1,427.59
  BRUMADO II EL 230 kV BRUMADO II LT 230 kV BRUMADO II /IBICOARA C-1 BA RB FT LT 230 kV BRUMADO II /IBICOARA C-1 BA 010/2007 IPCA RBL CC 010/2007 6/11/2007 6/11/2037 390,463.60
  C.GRANDE II BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,846.49
  C.GRANDE II BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 166,756.08
  C.GRANDE II BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 539,655.22
  C.GRANDE II BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,472.99
  C.GRANDE II BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 96,431.01
  C.GRANDE II BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RMEL REN 643/2014 12/11/2013 12/10/2033 87,248.11
  C.GRANDE II BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,350.06

 

45 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  C.GRANDE II BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 99,277.33
  C.GRANDE II BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 310,295.90
  C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE1 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RMEL REN 443/2011 16/03/2017 15/03/2050 17,370.03
  C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE1 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,972,784.96
  C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE1 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,080,327.73
  C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE2 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,080,327.73
  C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE2 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,972,784.96
  C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE2 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,384,316.98
  C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE2 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RMEL REN 443/2011 16/03/2017 15/03/2050 17,370.03
  C.GRANDE II CS 20/-10 MVAr C.GRANDE II CS1 PB RBF FT CS 20/-10 MVAr C.GRANDE II CS1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 704,172.41
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 149,707.89
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 467,918.95
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RCDM REA 4809/2014 17/02/2017 16/02/2047 78,448.94
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RCDM REA 4809/2014 17/02/2017 16/02/2047 78,448.94
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 149,707.89
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 467,918.95
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /COTEMINAS C-1 PB RB FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 226,933.03
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBNI REA 3208/2011 12/9/2019 12/9/2048 581.82
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2046 12,395.50
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RMEL REN 443/2011 14/02/2016 13/02/2046 12,409.69
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RMEL REN 443/2011 14/02/2016 13/02/2046 12,409.69
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBNI REA 2040/2009 1/5/2016 1/4/2047 166,912.59
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RMEL REN 443/2011 7/12/2017 7/11/2047 18,362.45
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  C.GRANDE II EL 69 kV C.GRANDE II  BOA VISTA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  C.GRANDE II EL 69 kV C.GRANDE II  BOQUEIRAO DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  C.GRANDE II EL 69 kV C.GRANDE II  EMBRATEX DIT   061/2001 IPCA RMEL REN 443/2011 31/03/2017 30/03/2048 28,181.56
  C.GRANDE II EL 69 kV C.GRANDE II  EMBRATEX DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  C.GRANDE II EL 69 kV C.GRANDE II  ESPERANCA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  C.GRANDE II EL 69 kV C.GRANDE II  ESPERANCA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  C.GRANDE II EL 69 kV C.GRANDE II  ESPERANCA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  C.GRANDE II EL 69 kV C.GRANDE II  ESPERANCA DIT   061/2001 IPCA RMEL REN 643/2014 10/10/2015 10/9/2029 736.90
  C.GRANDE II EL 69 kV C.GRANDE II  JUAZEIRINHO DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  C.GRANDE II EL 69 kV C.GRANDE II  JUAZEIRINHO DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  C.GRANDE II EL 69 kV C.GRANDE II  JUAZEIRINHO DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  C.GRANDE II EL 69 kV C.GRANDE II  QUEIMADAS DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  C.GRANDE II EL 69 kV C.GRANDE II LT 69 kV C.GRANDE II /BELA VISTA C-1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  C.GRANDE II EL 69 kV C.GRANDE II LT 69 kV C.GRANDE II /BELA VISTA C-1 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  C.GRANDE II EL 69 kV C.GRANDE II LT 69 kV C.GRANDE II /C.GRANDE I C-1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  C.GRANDE II EL 69 kV C.GRANDE II LT 69 kV C.GRANDE II /C.GRANDE I C-1 PB DIT   061/2001 IPCA RMEL REN 643/2014 10/9/2015 10/8/2029 368.40
  C.GRANDE II EL 69 kV C.GRANDE II LT 69 kV C.GRANDE II /C.GRANDE I C-1 PB DIT   061/2001 IPCA RMEL REN 643/2014 10/8/2015 10/7/2029 368.34
  C.GRANDE II IB 138 kV MG 230 kV C.GRANDE II MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,407.76
  C.GRANDE II IB 138 kV MG 230 kV C.GRANDE II MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 77,569.60
  C.GRANDE II IB 138 kV MG 230 kV C.GRANDE II MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 242,447.37
  C.GRANDE II IB 230 kV MG 230 kV C.GRANDE II MG1 PB IB1 RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  C.GRANDE II IB 230 kV MG 230 kV C.GRANDE II MG1 PB IB2 RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  C.GRANDE II IB 230 kV MG 230 kV C.GRANDE II MG1 PB IB3 RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  C.GRANDE II IB 69 kV MG 230 kV C.GRANDE II MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  C.GRANDE II MC 13,8 kV CS 20/-10 MVAr C.GRANDE II CS1 PB RBF FT CS 20/-10 MVAr C.GRANDE II CS1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,419.78
  C.GRANDE II MC 13,8 kV RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  C.GRANDE II MC 13,8 kV RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,473.00
  C.GRANDE II MC 13,8 kV RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,285.27
  C.GRANDE II MC 13,8 kV RTB 13,8 kV 5 MVAr C.GRANDE II RT2 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  C.GRANDE II MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 11T1 RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  C.GRANDE II MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 16T1 RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  C.GRANDE II MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 16T1 RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 38,868.36
  C.GRANDE II MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 16T1 RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 125,785.60
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 97,793.89
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 316,480.09
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RMEL REN 443/2011 18/05/2016 17/05/2046 10,855.18
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RMEL REN 443/2011 18/05/2016 17/05/2046 10,855.18
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RMEL REN 443/2011 18/05/2016 17/05/2046 10,855.18
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 97,793.89
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 316,480.09
  C.GRANDE II MC 230 kV BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 153,015.11
  C.GRANDE II MC 230 kV BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 145,104.98
  C.GRANDE II MC 230 kV BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 469,588.01
  C.GRANDE II MC 230 kV BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RMEL REN 443/2011 22/11/2017 21/11/2049 107,754.73
  C.GRANDE II MC 230 kV CE 100/-0 Mvar C.GRANDE II CE1 PB CE2 RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,744.46
  C.GRANDE II MC 230 kV RTB 230 kV 10 Mvar C.GRANDE II RT1 PB RB FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,896.88
  C.GRANDE II MC 230 kV RTB 230 kV 10 Mvar C.GRANDE II RT1 PB RB FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 122,233.54
  C.GRANDE II MC 230 kV RTB 230 kV 10 Mvar C.GRANDE II RT1 PB RB FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 395,571.59
  C.GRANDE II MC 230 kV RTB 230 kV 30 MVAr C.GRANDE II RT2 PB RB FT RTB 230 kV 30 MVAr C.GRANDE II RT2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,896.88
  C.GRANDE II MC 230 kV TR 230/138 kV C.GRANDE II TR1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  C.GRANDE II MC 230 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  C.GRANDE II MC 230 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RMEL REN 443/2011 11/1/2017 31/10/2049 107,602.70
  C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR4 PB RBF FT TR 230/69 kV C.GRANDE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR4 PB RBF FT TR 230/69 kV C.GRANDE II TR4 PB 061/2001 IPCA RMEL REN 443/2011 13/08/2017 8/12/2049 107,023.54
  C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR5 PB RBF FT TR 230/69 kV C.GRANDE II TR5 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  C.GRANDE II MC 69 kV BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  C.GRANDE II MC 69 kV BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  C.GRANDE II MC 69 kV BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  C.GRANDE II MC 69 kV BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RCDM REA 7761/2019 29/04/2019 28/04/2055 14,369.27
  C.GRANDE II MC 69 kV BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  C.GRANDE II MC 69 kV BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  C.GRANDE II MC 69 kV BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  C.GRANDE II MC 69 kV TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85

 

46 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 


  C.GRANDE II MC 69 kV TR 230/69 kV C.GRANDE II TR4 PB RBF FT TR 230/69 kV C.GRANDE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  C.GRANDE II MC 69 kV TR 230/69 kV C.GRANDE II TR5 PB RBF FT TR 230/69 kV C.GRANDE II TR5 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  C.GRANDE II MC 69 kV TR 69/13,8 kV C.GRANDE II TR7A PB TR7B/TR7C DIT   061/2001 IPCA RMEL REN 643/2014 10/8/2015 10/7/2029 368.34
  C.GRANDE II MC 69 kV TR 69/13,8 kV C.GRANDE II TR7A PB TR7B/TR7C DIT   061/2001 IPCA RMEL REN 643/2014 10/9/2015 10/8/2029 368.40
  C.GRANDE II MC 69 kV TT 69/13,8 kV C.GRANDE II TA1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 872,201.51
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 827,112.96
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,676,698.88
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 16/08/2013 15/08/2030 23,078.38
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 2/7/2014 2/6/2046 5,596.12
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 26/12/2015 25/12/2032 27,958.53
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 27/12/2015 26/12/2029 70,084.48
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 21/07/2014 20/07/2044 32,731.09
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 443/2011 23/09/2016 22/09/2033 28,900.24
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 443/2011 2/1/2016 31/01/2033 29,144.22
  C.GRANDE II RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  C.GRANDE II RTB 13,8 kV 5 MVAr C.GRANDE II RT2 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  C.GRANDE II RTB 230 kV 10 Mvar C.GRANDE II RT1 PB RB FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 176,208.84
  C.GRANDE II RTB 230 kV 30 MVAr C.GRANDE II RT2 PB RB FT RTB 230 kV 30 MVAr C.GRANDE II RT2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 211,617.11
  C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 353,089.34
  C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 353,089.34
  C.GRANDE II TR 230/138 kV C.GRANDE II TR1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 251,877.35
  C.GRANDE II TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 251,877.35
  C.GRANDE II TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  C.GRANDE II TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  C.GRANDE II TR 230/69 kV C.GRANDE II TR4 PB RBF FT TR 230/69 kV C.GRANDE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  C.GRANDE II TR 230/69 kV C.GRANDE II TR5 PB RBF FT TR 230/69 kV C.GRANDE II TR5 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  C.GRANDE II TR 230/69 kV C.GRANDE II TR5 PB RBF FT TR 230/69 kV C.GRANDE II TR5 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  C.GRANDE II TR 230/69 kV C.GRANDE II TR5 PB RBF FT TR 230/69 kV C.GRANDE II TR5 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  C.GRANDE II TT 69/13,8 kV C.GRANDE II TA1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  C.GRANDE II TT 69/13,8 kV C.GRANDE II TA1 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  C.GRANDE II TT 69/13,8 kV C.GRANDE II TA1 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  C.GRANDE II TT 69/13,8 kV C.GRANDE II TA2 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  C.GRANDE III EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 226,933.03
  C.GRANDE III EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2045 131,990.95
  C.GRANDE III EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2045 131,990.95
  C.GRANDE III EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2045 131,990.95
  C.GRANDE III EL 500 kV C.GRANDE III LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 493,197.94
  C.GRANDE III IB 230 kV MG 500 kV C.GRANDE III MG1 PB IB1 RB FT MG 500 kV C.GRANDE III MG1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 122,490.87
  C.GRANDE III IB 500 kV MG 500 kV C.GRANDE III MG1 PB IB1 RB FT MG 500 kV C.GRANDE III MG1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 470,427.78
  C.GRANDE III IB 500 kV MG 500 kV C.GRANDE III MG1 PB IB2 RB FT MG 500 kV C.GRANDE III MG1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 470,427.78
  C.GRANDE III MC 230 kV TR 500/230 kV C.GRANDE III TR1 PB RB FT TR 500/230 kV C.GRANDE III TR1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 161,645.93
  C.GRANDE III MC 230 kV TR 500/230 kV C.GRANDE III TR2 PB RB FT TR 500/230 kV C.GRANDE III TR2 PB 008/2011 IPCA RBNI REA 3738/2012 13/05/2015 13/05/2039 415,018.05
  C.GRANDE III MC 500 kV RTB 500 kV 150 Mvar C.GRANDE III RT1 PB RB FT RTB 500 kV 150 Mvar C.GRANDE III RT1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 411,001.87
  C.GRANDE III MC 500 kV RTL 500 kV 100 Mvar C.GRANDE III RTL2 PB RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 263,311.61
  C.GRANDE III MC 500 kV TR 500/230 kV C.GRANDE III TR1 PB RB FT TR 500/230 kV C.GRANDE III TR1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 439,802.07
  C.GRANDE III MC 500 kV TR 500/230 kV C.GRANDE III TR2 PB RB FT TR 500/230 kV C.GRANDE III TR2 PB 008/2011 IPCA RBNI REA 3738/2012 13/05/2015 13/05/2043 1,051,429.75
  C.GRANDE III MG 500 kV C.GRANDE III MG1 PB RB FT MG 500 kV C.GRANDE III MG1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 844,824.07
  C.GRANDE III MG 500 kV C.GRANDE III MG1 PB RB FT MG 500 kV C.GRANDE III MG1 PB 008/2011 IPCA RBNI REA 3738/2012 13/05/2015 13/05/2059 272,062.97
  C.GRANDE III RTB 500 kV 150 Mvar C.GRANDE III RT1 PB RB FT RTB 500 kV 150 Mvar C.GRANDE III RT1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 827,388.64
  C.GRANDE III RTB 500 kV 50 Mvar C.GRANDE III RTR1 PB RB FT RTB 500 kV 50 Mvar C.GRANDE III RTR1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 275,796.21
  C.GRANDE III RTL 500 kV 100 Mvar C.GRANDE III RTL2 PB RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 721,350.36
  C.GRANDE III RTL 500 kV 33,33 Mvar C.GRANDE III RTR2 PB RB FT RTL 500 kV 33,33 Mvar C.GRANDE III RTR2 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 240,449.85
  C.GRANDE III TR 500/230 kV C.GRANDE III TR1 PB RB FT TR 500/230 kV C.GRANDE III TR1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 1,991,360.55
  C.GRANDE III TR 500/230 kV C.GRANDE III TR2 PB RB FT TR 500/230 kV C.GRANDE III TR2 PB 008/2011 IPCA RBNI REA 3738/2012 13/05/2015 13/05/2050 4,473,375.70
  C.GRANDE III TR 500/230 kV C.GRANDE III TRR1 PB RB FT TR 500/230 kV C.GRANDE III TRR1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 663,786.59
  CAMACARI II CS 150/-105 MVAr CAMACARI II CS1 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,484,280.13
  CAMACARI II CS 150/-105 MVAr CAMACARI II CS1 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,407,550.11
  CAMACARI II CS 150/-105 MVAr CAMACARI II CS1 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,555,106.72
  CAMACARI II CS 150/-105 MVAr CAMACARI II CS1 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RMEL REN 443/2011 17/12/2016 16/12/2041 13,461.22
  CAMACARI II CS 150/-105 MVAr CAMACARI II CS2 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,484,280.13
  CAMACARI II CS 150/-105 MVAr CAMACARI II CS2 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,407,550.11
  CAMACARI II CS 150/-105 MVAr CAMACARI II CS2 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,555,106.72
  CAMACARI II EL 230 kV CAMACARI II  VAGO1 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  CAMACARI II EL 230 kV CAMACARI II  VAGO2 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  CAMACARI II EL 230 kV CAMACARI II  VAGO3 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  CAMACARI II EL 230 kV CAMACARI II  VAGO4 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  CAMACARI II EL 230 kV CAMACARI II  VAGO5 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  CAMACARI II EL 230 kV CAMACARI II  VAGO6 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  CAMACARI II EL 230 kV CAMACARI II  VAGO6 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  CAMACARI II EL 230 kV CAMACARI II  VAGO6 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  CAMACARI II EL 230 kV CAMACARI II  VAGO7 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  CAMACARI II EL 230 kV CAMACARI II  VAGO8 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 201,812.85
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 630,775.39
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RCDM REA 6137/2016 30/06/2020 30/06/2047 82,373.88
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-2 BA DIT   061/2001 IPCA RCDM REA 6137/2016 8/7/2020 8/7/2047 82,373.88
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RCDM REA 6137/2016 28/07/2020 28/07/2047 82,373.88
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-2 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-2 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-2 BA 061/2001 IPCA RMEL REN 643/2014 2/2/2014 2/1/2042 49,123.21
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-2 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-2 BA 061/2001 IPCA RBNI REA 6258/2017 27/11/2020 27/11/2050 128,126.10
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-2 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-2 BA 061/2001 IPCA RBNIA REA 6137/2016     82,373.88
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 6137/2016 26/08/2020 26/08/2047 82,373.88
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RMEL REN 643/2014 18/05/2014 17/05/2042 34,797.55
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 2376/2010 25/07/2014 24/07/2044 37,175.26
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI REA 6845/2018 15/09/2019 14/09/2052 95,894.00
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2041 82,177.75
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI REA 7761/2019 31/12/2019 30/12/2034 109,573.31
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 11/10/2013 11/9/2041 34,235.78
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 5/1/2014 30/04/2044 61,561.28
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBNI REA 2376/2010 25/07/2014 24/07/2044 37,175.26
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /PITUACU C-2 BA RB FT LT 230 kV CAMACARI II /PITUACU C-2 BA 061/2001 IPCA RBNI REA 6137/2016 26/06/2020 26/06/2047 82,373.88
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /PITUACU C-2 BA RB FT LT 230 kV CAMACARI II /PITUACU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /US.CAMACARI C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RMEL REN 443/2011 23/05/2015 22/05/2045 15,544.55
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RMEL REN 443/2011 10/11/2015 10/10/2045 15,715.10
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RMEL REN 443/2011 10/11/2015 10/10/2045 15,715.10

 

47 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBNI REA 7761/2019 6/10/2019 6/9/2034 35,822.58
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,322,567.42
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV OLINDINA /CAMACARI II C-1 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV OLINDINA /CAMACARI II C-1 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-1 BA 061/2001 IPCA RMEL REN 443/2011 26/01/2017 25/01/2047 3,014.26
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV OLINDINA /CAMACARI II C-2 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  CAMACARI II EL 69 kV CAMACARI II  CTG CTU-02J6 DIT   061/2001 IPCA RMEL REN 443/2011 16/01/2016 15/01/2046 1,144.17
  CAMACARI II EL 69 kV CAMACARI II  CTG CTU-02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CAMACARI II EL 69 kV CAMACARI II  CTG CTU-02J6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  CAMACARI II EL 69 kV CAMACARI II  STA HELENA-02F1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CAMACARI II EL 69 kV CAMACARI II  STA HELENA-02F1 DIT   061/2001 IPCA RMEL REN 443/2011 16/01/2016 15/01/2046 1,144.17
  CAMACARI II EL 69 kV CAMACARI II  STA HELENA-02F2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 643/2014 2/9/2014 2/8/2044 36,790.51
  CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 643/2014 2/9/2014 2/8/2044 18,395.26
  CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBNI REA 7761/2019 31/12/2019 30/12/2034 23,625.84
  CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB2 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/01/2014 29/01/2044 55,141.89
  CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB2 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB2 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB3 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB3 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB3 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 13/11/2015 11/12/2045 15,755.02
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 17/11/2015 16/11/2045 15,759.86
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 13/11/2015 11/12/2045 15,755.02
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 17/11/2015 16/11/2045 15,759.86
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 13/11/2015 11/12/2045 15,755.02
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 13/11/2015 11/12/2045 15,755.02
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  CAMACARI II IB 69 kV MG 500 kV CAMACARI II MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  CAMACARI II MC 13,8 kV CS 150/-105 MVAr CAMACARI II CS1 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,419.78
  CAMACARI II MC 13,8 kV CS 150/-105 MVAr CAMACARI II CS2 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,419.78
  CAMACARI II MC 13,8 kV TR 13,8/0,46 kV CAMACARI II TR1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  CAMACARI II MC 13,8 kV TR 13,8/0,46 kV CAMACARI II TR2 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  CAMACARI II MC 13,8 kV TR 69/13,8 kV CAMACARI II TR8 BA MC1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  CAMACARI II MC 13,8 kV TR 69/13,8 kV CAMACARI II TR8 BA MC2 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  CAMACARI II MC 230 kV TR 230/13,8 kV CAMACARI II TR7 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  CAMACARI II MC 230 kV TR 230/13,8 kV CAMACARI II TR7 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  CAMACARI II MC 230 kV TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBNI REA 6137/2016 20/01/2021 20/01/2047 107,698.95
  CAMACARI II MC 230 kV TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  CAMACARI II MC 230 kV TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  CAMACARI II MC 230 kV TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBNI REA 6137/2016 29/06/2020 29/06/2046 107,698.95
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RMEL REN 643/2014 6/8/2014 6/7/2044 55,707.86
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RMEL REN 643/2014 6/7/2014 6/6/2044 55,703.47
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBNI REA 6137/2016 20/12/2020 20/12/2051 204,114.11
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,526.62
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,526.62
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RBNI REA 6137/2016 20/12/2020 20/12/2051 204,114.11
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RMEL REN 643/2014 22/02/2014 21/02/2044 55,242.80
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044 55,247.18
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBNI REA 6137/2016 20/01/2021 20/01/2051 312,675.64
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,526.62
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBNI REA 6137/2016 1/3/2021 1/3/2047 107,698.95
  CAMACARI II MC 500 kV RTL 500 kV 100 Mvar CAMACARI II RT1 BA RB FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 325,812.25
  CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RMEL REN 443/2011 9/12/2015 9/11/2045 15,680.04
  CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RMEL REN 443/2011 9/12/2015 9/11/2045 15,680.04
  CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  CAMACARI II MC 69 kV TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  CAMACARI II MC 69 kV TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  CAMACARI II MC 69 kV TR 69/13,8 kV CAMACARI II TR8 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,531.97
  CAMACARI II MC 69 kV TT 69/13,8 kV CAMACARI II TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  CAMACARI II MC 69 kV TT 69/13,8 kV CAMACARI II TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,973,058.72
  CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,871,061.23
  CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,055,119.13
  CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 22,730.49
  CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 643/2014 2/7/2014 2/6/2028 278,654.45
  CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 21/02/2016 20/02/2033 55,119.03
  CAMACARI II RTL 500 kV 100 Mvar CAMACARI II RT1 BA RB FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 618,815.61
  CAMACARI II RTL 500 kV 100 Mvar CAMACARI II RT1 BA RB FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 586,825.87
  CAMACARI II RTL 500 kV 100 Mvar CAMACARI II RT1 BA RB FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,899,082.99
  CAMACARI II RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA RB FT RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 206,196.72
  CAMACARI II RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA RB FT RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 195,537.36
  CAMACARI II RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA RB FT RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 632,797.05
  CAMACARI II RTL 500 kV 60 Mvar CAMACARI II RTR2 BA RB FT RTL 500 kV 60 Mvar CAMACARI II RTR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,420.05
  CAMACARI II RTL 500 kV 60 Mvar CAMACARI II RTR2 BA RB FT RTL 500 kV 60 Mvar CAMACARI II RTR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 237,474.56
  CAMACARI II RTL 500 kV 60 Mvar CAMACARI II RTR2 BA RB FT RTL 500 kV 60 Mvar CAMACARI II RTR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 768,514.00
  CAMACARI II TR 230/13,8 kV CAMACARI II TR7 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 652,701.12
  CAMACARI II TR 230/13,8 kV CAMACARI II TR7 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 618,959.66
  CAMACARI II TR 230/13,8 kV CAMACARI II TR7 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,003,074.21
  CAMACARI II TR 230/13,8 kV CAMACARI II TRR1 BA RB FT TR 230/13,8 kV CAMACARI II TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 217,567.04
  CAMACARI II TR 230/13,8 kV CAMACARI II TRR1 BA RB FT TR 230/13,8 kV CAMACARI II TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 206,319.89
  CAMACARI II TR 230/13,8 kV CAMACARI II TRR1 BA RB FT TR 230/13,8 kV CAMACARI II TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 667,691.40
  CAMACARI II TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  CAMACARI II TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  CAMACARI II TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  CAMACARI II TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  CAMACARI II TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  CAMACARI II TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  CAMACARI II TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  CAMACARI II TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,624,997.02
  CAMACARI II TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,258,807.35
  CAMACARI II TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  CAMACARI II TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,624,997.02
  CAMACARI II TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  CAMACARI II TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,624,997.02
  CAMACARI II TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,258,807.35
  CAMACARI II TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  CAMACARI II TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,624,997.02

 

48 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  CAMACARI II TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,258,807.35
  CAMACARI II TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RMEL REN 643/2014 22/09/2013 21/09/2047 27,181.98
  CAMACARI II TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RMEL REN 643/2014 22/09/2013 21/09/2047 22,606.88
  CAMACARI II TR 500/230 kV CAMACARI II TRR1 BA RB FT TR 500/230 kV CAMACARI II TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 571,193.59
  CAMACARI II TR 500/230 kV CAMACARI II TRR1 BA RB FT TR 500/230 kV CAMACARI II TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 541,665.67
  CAMACARI II TR 69/13,8 kV CAMACARI II TR8 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  CAMACARI II TR 69/13,8 kV CAMACARI II TR8 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  CAMACARI II TR 69/13,8 kV CAMACARI II TR8 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  CAMACARI II TT 69/13,8 kV CAMACARI II TA1 BA DIT   061/2001 IPCA RCDM REA 3578/2012 8/8/2015 8/7/2045 192,819.38
  CAMACARI II TT 69/13,8 kV CAMACARI II TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  CAMACARI II TT 69/13,8 kV CAMACARI II TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  CAMACARI II TT 69/13,8 kV CAMACARI II TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 2891/2011 6/2/2014 6/1/2044 1,129,839.29
  CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /JACARACANGA C-1 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 9/1/2014 31/08/2044 1,136,816.12
  CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 8/11/2014 8/10/2044 1,135,206.07
  CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2891/2011 5/5/2014 5/4/2044 1,127,692.58
  CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBNI REA 2891/2011 13/10/2014 10/12/2044 1,140,036.18
  CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBNI REA 2891/2011 11/5/2014 11/4/2044 1,141,799.54
  CAMACARI IV EL 500 kV CAMACARI IV LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBNI REA 10135/2021 15/08/2016 15/08/2044 164,694.41
  CAMACARI IV EL 500 kV CAMACARI IV LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBNI REA 10135/2021 15/08/2016 15/08/2044 164,694.41
  CAMACARI IV IB 230 kV MG 500 kV CAMACARI IV MG1 BA IB1 RB FT MG 500 kV CAMACARI IV MG1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 7/12/2040 269,455.30
  CAMACARI IV IB 500 kV MG 500 kV CAMACARI IV MG1 BA IB1 RB FT MG 500 kV CAMACARI IV MG1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 7/12/2040 705,906.33
  CAMACARI IV IB 500 kV MG 500 kV CAMACARI IV MG1 BA IB2 RB FT MG 500 kV CAMACARI IV MG1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 7/12/2040 705,906.33
  CAMACARI IV MC 230 kV TR 500/230 kV CAMACARI IV TR1 BA RB FT TR 500/230 kV CAMACARI IV TR1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 7/12/2040 366,959.77
  CAMACARI IV MC 230 kV TR 500/230 kV CAMACARI IV TR2 BA RB FT TR 500/230 kV CAMACARI IV TR2 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 7/12/2040 366,959.77
  CAMACARI IV MC 500 kV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RMEL REN 643/2014 20/03/2014 19/03/2044 65,355.46
  CAMACARI IV MC 500 kV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 325,812.25
  CAMACARI IV MC 500 kV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 308,969.35
  CAMACARI IV MC 500 kV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 999,885.08
  CAMACARI IV MC 500 kV TR 500/230 kV CAMACARI IV TR1 BA RB FT TR 500/230 kV CAMACARI IV TR1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 7/12/2040 709,263.79
  CAMACARI IV MC 500 kV TR 500/230 kV CAMACARI IV TR2 BA RB FT TR 500/230 kV CAMACARI IV TR2 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 7/12/2040 709,263.79
  CAMACARI IV MG 500 kV CAMACARI IV MG1 BA RB FT MG 500 kV CAMACARI IV MG1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 7/12/2040 1,296,031.99
  CAMACARI IV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBNI REA 2376/2010 24/03/2014 23/03/2045 92,890.34
  CAMACARI IV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 707,153.50
  CAMACARI IV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 670,597.12
  CAMACARI IV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,170,183.11
  CAMACARI IV TR 500/230 kV CAMACARI IV TR1 BA RB FT TR 500/230 kV CAMACARI IV TR1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 7/12/2040 3,514,762.18
  CAMACARI IV TR 500/230 kV CAMACARI IV TR2 BA RB FT TR 500/230 kV CAMACARI IV TR2 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 7/12/2040 3,514,762.18
  CAMACARI IV TR 500/230 kV CAMACARI IV TRR1 BA RB FT TR 500/230 kV CAMACARI IV TRR1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 7/12/2040 1,171,586.78
  CATU EL 13,8 kV CATU  CATU 01Y1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  CATU EL 13,8 kV CATU  CATU 01Y1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  CATU EL 13,8 kV CATU  CATU 01Y1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 146,831.96
  CATU EL 13,8 kV CATU  CATU 01Y1 DIT   061/2001 IPCA RCDM REA 5484/2015 22/11/2016 21/11/2048 24,121.01
  CATU EL 13,8 kV CATU  CATU 01Y1 DIT   061/2001 IPCA RCDM REA 5484/2015 21/11/2016 20/11/2049 23,985.70
  CATU EL 13,8 kV CATU  CID. CATU DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  CATU EL 13,8 kV CATU  CID. CATU DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  CATU EL 13,8 kV CATU  CID. CATU DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 146,831.96
  CATU EL 13,8 kV CATU  CID. CATU DIT   061/2001 IPCA RCDM REA 5484/2015 22/11/2016 21/11/2047 37,860.81
  CATU EL 13,8 kV CATU  CID. CATU DIT   061/2001 IPCA RCDM REA 5484/2015 21/11/2016 20/11/2049 23,985.70
  CATU EL 13,8 kV CATU  POJUCA 01Y4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  CATU EL 13,8 kV CATU  POJUCA 01Y4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  CATU EL 13,8 kV CATU  POJUCA 01Y4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 146,831.96
  CATU EL 13,8 kV CATU  POJUCA 01Y4 DIT   061/2001 IPCA RCDM REA 5484/2015 22/11/2016 21/11/2048 34,508.68
  CATU EL 13,8 kV CATU  POJUCA 01Y4 DIT   061/2001 IPCA RCDM REA 5484/2015 21/11/2016 20/11/2049 23,985.70
  CATU EL 13,8 kV CATU  POJUCA 01Y5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  CATU EL 13,8 kV CATU  POJUCA 01Y5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  CATU EL 13,8 kV CATU  POJUCA 01Y5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 146,831.96
  CATU EL 13,8 kV CATU  POJUCA 01Y5 DIT   061/2001 IPCA RCDM REA 5484/2015 22/11/2016 21/11/2048 31,156.52
  CATU EL 13,8 kV CATU  POJUCA 01Y5 DIT   061/2001 IPCA RCDM REA 5484/2015 21/11/2016 20/11/2049 23,985.70
  CATU EL 230 kV CATU  FERBASA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 197,192.82
  CATU EL 230 kV CATU  SCHIN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 197,192.82
  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RMEL REN 443/2011 10/4/2017 10/3/2047 2,930.43
  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RMEL REN 443/2011 14/06/2017 13/06/2047 6,234.19
  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBNI REA 2891/2011 13/10/2014 10/12/2040 79,276.50
  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBNI REA 2891/2011 11/5/2014 11/4/2040 79,438.08
  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RMEL REN 443/2011 29/09/2017 28/09/2047 6,246.29
  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RMEL REN 443/2011 10/1/2017 30/09/2047 6,221.07
  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  CATU EL 230 kV CATU LT 230 kV CATU /G.MANGABEIRA C-1 BA RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  CATU EL 230 kV CATU LT 230 kV CATU /G.MANGABEIRA C-1 BA RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2041 82,177.75
  CATU EL 230 kV CATU LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  CATU EL 230 kV CATU LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  CATU EL 230 kV CATU LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RMEL REN 443/2011 21/09/2017 20/09/2047 6,242.65
  CATU EL 230 kV CATU LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  CATU EL 69 kV CATU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CATU EL 69 kV CATU  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CATU EL 69 kV CATU  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CATU EL 69 kV CATU  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CATU EL 69 kV CATU  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CATU EL 69 kV CATU  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CATU EL 69 kV CATU LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CATU EL 69 kV CATU LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CATU IB 13,8 kV MG 230 kV CATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,720.57
  CATU IB 230 kV MG 230 kV CATU MG1 BA IB1 RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  CATU IB 230 kV MG 230 kV CATU MG1 BA IB2 RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  CATU IB 69 kV MG 230 kV CATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  CATU MC 13,8 kV TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 44,484.03
  CATU MC 13,8 kV TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 44,484.03
  CATU MC 230 kV TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  CATU MC 230 kV TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 133,743.70
  CATU MC 230 kV TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 432,820.70
  CATU MC 230 kV TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  CATU MC 230 kV TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 133,743.70
  CATU MC 230 kV TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 432,820.70
  CATU MC 230 kV TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBNI REA 2173/2009 24/09/2013 23/09/2041 248,493.56
  CATU MC 230 kV TR 230/69 kV CATU TR3 BA RBF FT TR 230/69 kV CATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  CATU MC 69 kV TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  CATU MC 69 kV TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  CATU MC 69 kV TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBNI REA 2173/2009 24/09/2013 23/09/2043 323,496.32
  CATU MC 69 kV TR 230/69 kV CATU TR3 BA RBF FT TR 230/69 kV CATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  CATU MC 69 kV TT 69/0 kV CATU TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  CATU MC 69 kV TT 69/13,8 kV CATU TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 624,738.98
  CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 592,443.03
  CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,917,261.22
  CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RMEL REN 443/2011 15/04/2016 14/04/2044 3,235.33
  CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 28,817.16
  CATU RTS 13,8 kV 5 MVAr CATU RT1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  CATU RTS 13,8 kV 5 MVAr CATU RT1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32

 

49 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  CATU RTS 13,8 kV 5 MVAr CATU RT1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 353,089.34
  CATU RTS 13,8 kV 5 Mvar CATU RT2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 353,089.34
  CATU RTS 13,8 kV 5 Mvar CATU RT2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  CATU RTS 13,8 kV 5 Mvar CATU RT2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  CATU TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  CATU TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBNI REA 2173/2009 24/09/2013 23/09/2047 1,309,904.97
  CATU TR 230/69 kV CATU TR3 BA RBF FT TR 230/69 kV CATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  CATU TT 69/0 kV CATU TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  CATU TT 69/13,8 kV CATU TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-1 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-1 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-2 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-2 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-3 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-3 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-3 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-3 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-3 CE 061/2001 IPCA RMEL REN 643/2014 16/08/2014 15/08/2044 18,670.20
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-3 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-3 CE 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBNI REA 2460/2010 21/11/2013 20/11/2042 269,184.41
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  CAUIPE EL 69 kV CAUIPE  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CAUIPE EL 69 kV CAUIPE  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CAUIPE EL 69 kV CAUIPE  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CAUIPE EL 69 kV CAUIPE  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  CAUIPE EL 69 kV CAUIPE  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  CAUIPE EL 69 kV CAUIPE  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CAUIPE EL 69 kV CAUIPE  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  CAUIPE EL 69 kV CAUIPE  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  CAUIPE EL 69 kV CAUIPE  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CAUIPE EL 69 kV CAUIPE  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  CAUIPE EL 69 kV CAUIPE  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  CAUIPE EL 69 kV CAUIPE  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CAUIPE EL 69 kV CAUIPE  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  CAUIPE EL 69 kV CAUIPE  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  CAUIPE EL 69 kV CAUIPE  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CAUIPE IB 230 kV MG 230 kV CAUIPE MG1 CE IB1 RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  CAUIPE IB 69 kV MG 230 kV CAUIPE MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  CAUIPE IB 69 kV MG 230 kV CAUIPE MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  CAUIPE IB 69 kV MG 230 kV CAUIPE MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  CAUIPE MC 230 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  CAUIPE MC 230 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  CAUIPE MC 230 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  CAUIPE MC 230 kV TR 230/69 kV CAUIPE TR2 CE RBF FT TR 230/69 kV CAUIPE TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  CAUIPE MC 230 kV TR 230/69 kV CAUIPE TR3 CE RBF FT TR 230/69 kV CAUIPE TR3 CE 061/2001 IPCA RBNI REA 2968/2011 17/06/2018 17/06/2052 436,619.29
  CAUIPE MC 69 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  CAUIPE MC 69 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  CAUIPE MC 69 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  CAUIPE MC 69 kV TR 230/69 kV CAUIPE TR2 CE RBF FT TR 230/69 kV CAUIPE TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  CAUIPE MC 69 kV TR 230/69 kV CAUIPE TR3 CE RBF FT TR 230/69 kV CAUIPE TR3 CE 061/2001 IPCA RBNI REA 2968/2011 17/06/2018 17/06/2052 187,131.64
  CAUIPE MC 69 kV TT 69/13,8 kV CAUIPE TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  CAUIPE MG 230 kV CAUIPE MG1 CE RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 485,683.62
  CAUIPE MG 230 kV CAUIPE MG1 CE RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 460,576.15
  CAUIPE MG 230 kV CAUIPE MG1 CE RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,490,514.27
  CAUIPE MG 230 kV CAUIPE MG1 CE RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RMEL REN 443/2011 7/9/2016 7/8/2033 28,637.12
  CAUIPE MG 230 kV CAUIPE MG1 CE RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RMEL REN 643/2014 31/10/2013 30/10/2030 25,237.25
  CAUIPE TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  CAUIPE TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  CAUIPE TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  CAUIPE TR 230/69 kV CAUIPE TR2 CE RBF FT TR 230/69 kV CAUIPE TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  CAUIPE TR 230/69 kV CAUIPE TR3 CE RBF FT TR 230/69 kV CAUIPE TR3 CE 061/2001 IPCA RBNI REA 2968/2011 17/06/2018 17/06/2058 935,266.23
  CAUIPE TT 69/13,8 kV CAUIPE TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  CAUIPE TT 69/13,8 kV CAUIPE TA1 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  CAUIPE TT 69/13,8 kV CAUIPE TA1 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  CEARA MIRIM II CE 150/-75 Mvar CEARA MIRIM II CE1 RN RB FT CE 150/-75 Mvar CEARA MIRIM II CE1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 2,870,615.84
  CEARA MIRIM II EL 230 kV CEARA MIRIM II LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 226,933.03
  CEARA MIRIM II EL 230 kV CEARA MIRIM II LT 230 kV TOUROS /CEARA MIRIM II C-1 RN RB FT LT 230 kV TOUROS /CEARA MIRIM II C-1 RN 018/2012 IPCA RBL CC 018/2012 5/12/2017 6/1/2042 441,712.23
  CEARA MIRIM II EL 500 kV CEARA MIRIM II LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 493,197.94
  CEARA MIRIM II EL 500 kV CEARA MIRIM II LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN RB FT LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 493,197.94
  CEARA MIRIM II IB 230 kV MG 500 kV CEARA MIRIM II MG1 RN IB1 RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 122,490.87
  CEARA MIRIM II IB 500 kV MG 500 kV CEARA MIRIM II MG1 RN IB1 RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 470,427.77
  CEARA MIRIM II IB 500 kV MG 500 kV CEARA MIRIM II MG1 RN IB2 RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 470,427.77
  CEARA MIRIM II IB 500 kV MG 500 kV CEARA MIRIM II MG1 RN IB3 RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 470,427.77
  CEARA MIRIM II MC 230 kV CE 150/-75 Mvar CEARA MIRIM II CE1 RN RB FT CE 150/-75 Mvar CEARA MIRIM II CE1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 164,590.46
  CEARA MIRIM II MC 230 kV TR 500/230 kV CEARA MIRIM II TR1 RN RB FT TR 500/230 kV CEARA MIRIM II TR1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 161,645.93
  CEARA MIRIM II MC 230 kV TR 500/230 kV CEARA MIRIM II TR2 RN RB FT TR 500/230 kV CEARA MIRIM II TR2 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 161,645.93
  CEARA MIRIM II MC 500 kV RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN RB FT RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 411,001.86
  CEARA MIRIM II MC 500 kV RTL 500 kV 100 Mvar CEARA MIRIM II RTL2 RN RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 263,311.61
  CEARA MIRIM II MC 500 kV TR 500/230 kV CEARA MIRIM II TR1 RN RB FT TR 500/230 kV CEARA MIRIM II TR1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 439,802.07
  CEARA MIRIM II MC 500 kV TR 500/230 kV CEARA MIRIM II TR2 RN RB FT TR 500/230 kV CEARA MIRIM II TR2 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 439,802.07
  CEARA MIRIM II MG 500 kV CEARA MIRIM II MG1 RN RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 833,627.35
  CEARA MIRIM II RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN RB FT RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 827,388.63
  CEARA MIRIM II RTB 500 kV 50 Mvar CEARA MIRIM II RTR1 RN RB FT RTB 500 kV 50 Mvar CEARA MIRIM II RTR1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 275,796.21
  CEARA MIRIM II RTL 500 kV 100 Mvar CEARA MIRIM II RTL2 RN RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 721,350.36
  CEARA MIRIM II RTL 500 kV 33,33 Mvar CEARA MIRIM II RTR2 RN RB FT RTL 500 kV 33,33 Mvar CEARA MIRIM II RTR2 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 240,449.85
  CEARA MIRIM II TR 500/230 kV CEARA MIRIM II TR1 RN RB FT TR 500/230 kV CEARA MIRIM II TR1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 1,809,149.87
  CEARA MIRIM II TR 500/230 kV CEARA MIRIM II TR2 RN RB FT TR 500/230 kV CEARA MIRIM II TR2 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 1,809,149.87
  CEARA MIRIM II TR 500/230 kV CEARA MIRIM II TRR1 RN RB FT TR 500/230 kV CEARA MIRIM II TRR1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 603,049.69
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 20/11/2013 19/11/2046 93,609.95
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RMEL REN 643/2014 23/10/2013 22/10/2046 93,415.42
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RMEL REN 643/2014 11/1/2013 31/10/2046 93,477.95
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RMEL REN 643/2014 11/8/2013 11/7/2046 93,526.59
  CIC. DANTAS EL 69 kV CIC. DANTAS  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  CIC. DANTAS EL 69 kV CIC. DANTAS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  CIC. DANTAS IB 230 kV MG 230 kV CIC. DANTAS MG1 BA IB1 RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  CIC. DANTAS IB 230 kV MG 230 kV CIC. DANTAS MG1 BA IB1 RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 12/4/2013 12/3/2046 93,707.21
  CIC. DANTAS IB 69 kV MG 230 kV CIC. DANTAS MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  CIC. DANTAS MC 230 kV TR 230/69 kV CIC. DANTAS TR3 BA RBF FT TR 230/69 kV CIC. DANTAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  CIC. DANTAS MC 230 kV TR 230/69 kV CIC. DANTAS TR4 BA RBF FT TR 230/69 kV CIC. DANTAS TR4 BA 061/2001 IPCA RBNI REA 5211/2015 17/03/2018 17/03/2041 586,161.73
  CIC. DANTAS MC 230 kV TR 230/69 kV CIC. DANTAS TR5 BA RBF FT TR 230/69 kV CIC. DANTAS TR5 BA 061/2001 IPCA RBNI REA 2823/2011 30/12/2012 29/12/2042 665,816.72
  CIC. DANTAS MC 69 kV TR 230/69 kV CIC. DANTAS TR3 BA RBF FT TR 230/69 kV CIC. DANTAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  CIC. DANTAS MC 69 kV TR 230/69 kV CIC. DANTAS TR4 BA RBF FT TR 230/69 kV CIC. DANTAS TR4 BA 061/2001 IPCA RBNI REA 5211/2015 17/03/2018 17/03/2041 311,733.33
  CIC. DANTAS MC 69 kV TR 230/69 kV CIC. DANTAS TR5 BA RBF FT TR 230/69 kV CIC. DANTAS TR5 BA 061/2001 IPCA RBNI REA 2823/2011 30/12/2012 29/12/2042 220,719.24
  CIC. DANTAS MC 69 kV TR 69/13,8 kV CIC. DANTAS TR3 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBNI REA 2823/2011 30/12/2012 29/12/2040 215,236.49

 

50 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,220.23
  CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 440,222.31
  CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBNI REA 5211/2015 17/03/2018 17/03/2050 79,929.07
  CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 25/11/2015 24/11/2032 30,763.66
  CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RMEL REN 443/2011 22/09/2016 21/09/2049 9,743.03
  CIC. DANTAS RTS 69 kV 40 Mvar CIC. DANTAS RT1 BA RBF FT TR 230/69 kV CIC. DANTAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,319.34
  CIC. DANTAS TR 230/69 kV CIC. DANTAS TR3 BA RBF FT TR 230/69 kV CIC. DANTAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 226,840.77
  CIC. DANTAS TR 230/69 kV CIC. DANTAS TR4 BA RBF FT TR 230/69 kV CIC. DANTAS TR4 BA 061/2001 IPCA RBNI REA 5211/2015 17/03/2018 17/03/2052 851,408.53
  CIC. DANTAS TR 230/69 kV CIC. DANTAS TR5 BA RBF FT TR 230/69 kV CIC. DANTAS TR5 BA 061/2001 IPCA RBNI REA 2823/2011 30/12/2012 29/12/2046 1,064,025.13
  CIC. DANTAS TR 69/13,8 kV CIC. DANTAS TR3 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  CIC. DANTAS TR 69/13,8 kV CIC. DANTAS TR3 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  CIC. DANTAS TR 69/13,8 kV CIC. DANTAS TR3 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  CIC. DANTAS TT 69/13,8 kV CIC. DANTAS TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  COREMAS EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBNI REA 5861/2016 12/8/2013 12/7/2041 31,535.20
  COREMAS EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  COREMAS EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  COREMAS EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-2 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-2 CE/PB 008/2005 IGPM RBL CC 008/2005 25/09/2009 3/4/2035 409,441.49
  COREMAS EL 69 kV COREMAS  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COREMAS EL 69 kV COREMAS  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COREMAS EL 69 kV COREMAS  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COREMAS EL 69 kV COREMAS  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COREMAS EL 69 kV COREMAS  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  COREMAS EL 69 kV COREMAS  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COREMAS EL 69 kV COREMAS  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  COREMAS EL 69 kV COREMAS  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COREMAS EL 69 kV COREMAS  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  COREMAS EL 69 kV COREMAS  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COREMAS EL 69 kV COREMAS  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  COREMAS EL 69 kV COREMAS  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COREMAS EL 69 kV COREMAS  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  COREMAS IB 230 kV MG 230 kV COREMAS MG1 PB IB1 RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  COREMAS IB 230 kV MG 230 kV COREMAS MG1 PB IB1 RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  COREMAS IB 69 kV MG 230 kV COREMAS MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  COREMAS IB 69 kV MG 230 kV COREMAS MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  COREMAS IB 69 kV MG 230 kV COREMAS MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  COREMAS MC 13,8 kV RTB 13,8 kV 5 MVAr COREMAS RT1 PB RBF FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  COREMAS MC 13,8 kV TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  COREMAS MC 230 kV TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  COREMAS MC 230 kV TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  COREMAS MC 230 kV TR 230/69 kV COREMAS TR2 PB RBF FT TR 230/69 kV COREMAS TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  COREMAS MC 230 kV TR 230/69 kV COREMAS TR3 PB RBF FT TR 230/69 kV COREMAS TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  COREMAS MC 69 kV TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  COREMAS MC 69 kV TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  COREMAS MC 69 kV TR 230/69 kV COREMAS TR2 PB RBF FT TR 230/69 kV COREMAS TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  COREMAS MC 69 kV TR 230/69 kV COREMAS TR3 PB RBF FT TR 230/69 kV COREMAS TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  COREMAS MC 69 kV TT 69/13,8 kV COREMAS TA1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 468,799.67
  COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 444,565.01
  COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,438,699.11
  COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RMEL REN 643/2014 30/11/2013 29/11/2041 71,386.84
  COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RMEL REN 643/2014 16/10/2015 15/10/2032 27,712.72
  COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RMEL REN 643/2014 17/12/2015 16/12/2029 13,492.80
  COREMAS RTB 13,8 kV 5 MVAr COREMAS RT1 PB RBF FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  COREMAS RTB 13,8 kV 5 MVAr COREMAS RT1 PB RBF FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  COREMAS RTB 13,8 kV 5 MVAr COREMAS RT1 PB RBF FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 353,089.34
  COREMAS TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  COREMAS TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  COREMAS TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  COREMAS TR 230/69 kV COREMAS TR2 PB RBF FT TR 230/69 kV COREMAS TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  COREMAS TR 230/69 kV COREMAS TR3 PB RBF FT TR 230/69 kV COREMAS TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  COREMAS TT 69/13,8 kV COREMAS TA1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  COREMAS TT 69/13,8 kV COREMAS TA1 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  COREMAS TT 69/13,8 kV COREMAS TA1 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  COTEGIPE BC 69 kV 20,3 Mvar COTEGIPE BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,472.99
  COTEGIPE BC 69 kV 20,3 Mvar COTEGIPE BC1 BA DIT   061/2001 IPCA RMEL REN 643/2014 18/09/2013 17/09/2033 86,383.64
  COTEGIPE BC 69 kV 27,1 Mvar COTEGIPE BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,634.31
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV CAMACARI II /COTEGIPE C-2 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-2 BA 061/2001 IPCA RBNI REA 6258/2017 27/11/2020 27/11/2050 175,077.68
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV CAMACARI II /COTEGIPE C-2 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV CAMACARI IV /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV CAMACARI IV /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 2891/2011 6/2/2014 6/1/2040 78,342.20
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /MATATU C-1 BA RB FT LT 230 kV COTEGIPE /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /SIBRA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 192,089.95
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /SIBRA C-1 BA DIT   061/2001 IPCA RCDM REA 2837/2011 23/09/2013 22/09/2043 51,379.42
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /SIBRA C-1 BA DIT   061/2001 IPCA RCDM REA 2837/2011 26/09/2013 25/09/2046 84,434.92
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /USIBA C-1 BA DIT   061/2001 IPCA RCDM REA 2837/2011 27/12/2013 26/12/2044 185,982.98
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /USIBA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 192,089.95
  COTEGIPE EL 69 kV COTEGIPE  CAMACARI I 02J3 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046 29,091.26
  COTEGIPE EL 69 kV COTEGIPE  CAMACARI I 02J3 DIT   061/2001 IPCA RMEL REN 443/2011 21/01/2016 20/01/2046 8,745.46
  COTEGIPE EL 69 kV COTEGIPE  CAMACARI I 02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COTEGIPE EL 69 kV COTEGIPE  CAMACARI I 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COTEGIPE EL 69 kV COTEGIPE  CAMACARI I 02J4 DIT   061/2001 IPCA RMEL REN 443/2011 22/01/2016 21/01/2046 8,746.13
  COTEGIPE EL 69 kV COTEGIPE  CAMACARI I 02J4 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046 29,091.26
  COTEGIPE EL 69 kV COTEGIPE  CIA I 02C6 DIT   061/2001 IPCA RCDM REA 1814/2009 15/10/2013 14/10/2045 31,905.93
  COTEGIPE EL 69 kV COTEGIPE  CIA I 02C6 DIT   061/2001 IPCA RCDM REA 2040/2009 15/10/2013 14/10/2044 74,071.76
  COTEGIPE EL 69 kV COTEGIPE  CIA I 02C6 DIT   061/2001 IPCA RCDM REA 2040/2009 15/10/2013 14/10/2043 29,118.35
  COTEGIPE EL 69 kV COTEGIPE  CIA I 02C6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COTEGIPE EL 69 kV COTEGIPE  CIA I 02C9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COTEGIPE EL 69 kV COTEGIPE  CIA I 02C9 DIT   061/2001 IPCA RCDM REA 2040/2009 14/12/2013 13/12/2044 74,420.77
  COTEGIPE EL 69 kV COTEGIPE  CIA I 02C9 DIT   061/2001 IPCA RCDM REA 1814/2009 14/12/2013 13/12/2045 32,049.04
  COTEGIPE EL 69 kV COTEGIPE  CIA II 02L7 DIT   061/2001 IPCA RCDM REA 1814/2009 19/09/2013 18/09/2045 31,843.92
  COTEGIPE EL 69 kV COTEGIPE  CIA II 02L7 DIT   061/2001 IPCA RCDM REA 2376/2010 19/09/2013 18/09/2044 73,920.53
  COTEGIPE EL 69 kV COTEGIPE  CIA II 02L7 DIT   061/2001 IPCA RCDM REA 2376/2010 19/09/2013 18/09/2043 29,192.12
  COTEGIPE EL 69 kV COTEGIPE  CIA II 02L7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COTEGIPE EL 69 kV COTEGIPE  CIA II 02L8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COTEGIPE EL 69 kV COTEGIPE  CIA II 02L8 DIT   061/2001 IPCA RCDM REA 2376/2010 28/10/2013 27/10/2044 103,430.70
  COTEGIPE EL 69 kV COTEGIPE  CIA II 02L8 DIT   061/2001 IPCA RCDM REA 1814/2009 25/10/2013 24/10/2045 31,929.79
  COTEGIPE EL 69 kV COTEGIPE  CIM-ARATU 02L1 DIT   061/2001 IPCA RCDM REA 1814/2009 14/04/2013 13/04/2045 31,467.07
  COTEGIPE EL 69 kV COTEGIPE  CIM-ARATU 02L1 DIT   061/2001 IPCA RMEL REN 443/2011 2/3/2016 2/2/2046 8,676.07
  COTEGIPE EL 69 kV COTEGIPE  CIM-ARATU 02L1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COTEGIPE EL 69 kV COTEGIPE  EMBASA 02L3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COTEGIPE EL 69 kV COTEGIPE  EMBASA 02L3 DIT   061/2001 IPCA RCDM REA 1814/2009 13/06/2013 6/12/2045 31,610.18
  COTEGIPE EL 69 kV COTEGIPE  MILLENIUM  02C1 DIT   061/2001 IPCA RMEL REN 443/2011 15/01/2016 14/01/2046 8,741.45
  COTEGIPE EL 69 kV COTEGIPE  MILLENIUM  02C1 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046 29,091.26
  COTEGIPE EL 69 kV COTEGIPE  MILLENIUM  02C1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COTEGIPE EL 69 kV COTEGIPE  MILLENIUM  02C2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COTEGIPE EL 69 kV COTEGIPE  MILLENIUM  02C2 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046 29,091.26
  COTEGIPE EL 69 kV COTEGIPE  MILLENIUM  02C2 DIT   061/2001 IPCA RMEL REN 443/2011 18/01/2016 17/01/2046 8,743.46
  COTEGIPE EL 69 kV COTEGIPE  PARIPE 02L2 DIT   061/2001 IPCA RCDM REA 1814/2009 5/5/2013 5/4/2045 31,517.16
  COTEGIPE EL 69 kV COTEGIPE  PARIPE 02L2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84

 

51 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RMEL REN 443/2011 25/01/2016 24/01/2046 8,748.14
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RCDM REA 2376/2010 28/02/2014 27/02/2045 51,048.82
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046 29,091.26
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046 29,091.26
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RMEL REN 443/2011 26/01/2016 25/01/2046 6,561.61
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-2 BA DIT   061/2001 IPCA RCDM REA 2376/2010 8/11/2013 8/10/2044 73,693.66
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-2 BA DIT   061/2001 IPCA RCDM REA 1814/2009 8/11/2013 8/10/2045 31,750.90
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  COTEGIPE IB 230 kV MG 230 kV COTEGIPE MG1 BA IB1 RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  COTEGIPE IB 230 kV MG 230 kV COTEGIPE MG1 BA IB1 RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 2837/2011 9/4/2014 9/3/2046 91,197.61
  COTEGIPE IB 230 kV MG 230 kV COTEGIPE MG1 BA IB1 RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RMEL REN 443/2011 14/01/2016 13/01/2046 4,370.40
  COTEGIPE IB 69 kV MG 230 kV COTEGIPE MG1 BA IB1 DIT   061/2001 IPCA RCDM REA 1814/2009 2/1/2013 31/01/2045 31,295.34
  COTEGIPE IB 69 kV MG 230 kV COTEGIPE MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  COTEGIPE IB 69 kV MG 230 kV COTEGIPE MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  COTEGIPE IB 69 kV MG 230 kV COTEGIPE MG1 BA IB2 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2014 29/01/2046 32,161.15
  COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR1 BA RBF FT TR 230/69 kV COTEGIPE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR1 BA RBF FT TR 230/69 kV COTEGIPE TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBNI REA 2837/2011 6/6/2014 6/5/2045 38,167.88
  COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR3 BA RBF FT TR 230/69 kV COTEGIPE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR4 BA RBF FT TR 230/69 kV COTEGIPE TR4 BA 061/2001 IPCA RMEL REN 443/2011 2/5/2016 2/4/2046 6,508.04
  COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR4 BA RBF FT TR 230/69 kV COTEGIPE TR4 BA 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2047 1,059,814.00
  COTEGIPE MC 69 kV BC 69 kV 20,3 Mvar COTEGIPE BC1 BA DIT   061/2001 IPCA RMEL REN 443/2011 24/05/2016 23/05/2046 4,296.13
  COTEGIPE MC 69 kV BC 69 kV 20,3 Mvar COTEGIPE BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  COTEGIPE MC 69 kV BC 69 kV 27,1 Mvar COTEGIPE BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  COTEGIPE MC 69 kV BC 69 kV 27,1 Mvar COTEGIPE BC2 BA DIT   061/2001 IPCA RMEL REN 443/2011 2/4/2016 2/3/2046 2,169.18
  COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR1 BA RBF FT TR 230/69 kV COTEGIPE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RMEL REN 443/2011 2/4/2016 2/3/2046 6,507.55
  COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR3 BA RBF FT TR 230/69 kV COTEGIPE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR4 BA RBF FT TR 230/69 kV COTEGIPE TR4 BA 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2047 413,192.27
  COTEGIPE MC 69 kV TR 69/13,8 kV COTEGIPE TR8 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 1814/2009 30/01/2013 29/01/2046 29,091.26
  COTEGIPE MC 69 kV TR 69/13,8 kV COTEGIPE TR8 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 592,250.00
  COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 561,633.57
  COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2045 190,061.91
  COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2045 54,783.46
  COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 23,222.36
  COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RMEL REN 443/2011 2/5/2016 2/4/2046 6,508.05
  COTEGIPE TR 230/69 kV COTEGIPE TR1 BA RBF FT TR 230/69 kV COTEGIPE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  COTEGIPE TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  COTEGIPE TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  COTEGIPE TR 230/69 kV COTEGIPE TR3 BA RBF FT TR 230/69 kV COTEGIPE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  COTEGIPE TR 230/69 kV COTEGIPE TR4 BA RBF FT TR 230/69 kV COTEGIPE TR4 BA 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2051 1,367,251.70
  COTEGIPE TR 69/13,8 kV COTEGIPE TR8 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  COTEGIPE TT 69/13,8 kV COTEGIPE TA1 BA DIT   061/2001 IPCA RCDM REA 3578/2012 17/01/2016 16/01/2046 194,908.06
  COTEGIPE TT 69/13,8 kV COTEGIPE TA1 BA DIT   061/2001 IPCA RMEL REN 443/2011 19/01/2016 18/01/2046 2,186.04
  COTEGIPE TT 69/13,8 kV COTEGIPE TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  COTEMINAS EL 230 kV COTEMINAS LT 230 kV C.GRANDE II /COTEMINAS C-1 PB RB FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  COTEMINAS EL 230 kV COTEMINAS LT 230 kV COTEMINAS /PAU FERRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /PAU FERRO C-1 PB/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  COTEMINAS IB 230 kV MG 230 kV COTEMINAS MG1 PB IB1 RB FT MG 230 kV COTEMINAS MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  COTEMINAS MG 230 kV COTEMINAS MG1 PB RB FT MG 230 kV COTEMINAS MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,019.83
  DELM. GOUVEIA BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,846.49
  DELM. GOUVEIA BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 166,756.08
  DELM. GOUVEIA BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 539,655.22
  DELM. GOUVEIA BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 109,673.76
  DELM. GOUVEIA BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 109,673.76
  DELM. GOUVEIA BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 109,673.76
  DELM. GOUVEIA BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 109,673.76
  DELM. GOUVEIA EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  DELM. GOUVEIA EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  DELM. GOUVEIA EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RMEL REN 643/2014 8/10/2014 8/9/2044 18,661.42
  DELM. GOUVEIA EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  DELM. GOUVEIA EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N2 DIT   061/2001 IPCA RCDM REA 2040/2009 2/5/2013 2/4/2044 72,605.91
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N2 DIT   061/2001 IPCA RCDM REA 2040/2009 2/5/2013 2/4/2043 28,663.60
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N3 DIT   061/2001 IPCA RCDM REA 2040/2009 30/12/2012 29/12/2042 25,362.80
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N3 DIT   061/2001 IPCA RCDM REA 2040/2009 4/9/2013 4/8/2043 28,810.93
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N3 DIT   061/2001 IPCA RMEL REN 443/2011 1/12/2016 1/11/2039 4,262.82
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  ALDEOTA 02N1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  ALDEOTA 02N1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  ALDEOTA 02N1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  ALDEOTA 02N1 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 44,254.02
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  DIA MACEDO 02J6 DIT   061/2001 IPCA RCDM REA 2040/2009 3/3/2013 3/2/2044 23,145.40
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  DIA MACEDO 02J6 DIT   061/2001 IPCA RCDM REA 2040/2009 3/3/2013 3/2/2043 28,592.16
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  DIA MACEDO 02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  DIA MACEDO 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  DIA MACEDO 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J3 DIT   061/2001 IPCA RMEL REN 443/2011 20/12/2015 19/12/2038 4,112.62
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J3 DIT   061/2001 IPCA RCDM REA 2040/2009 30/12/2012 29/12/2042 25,362.80
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J4 DIT   061/2001 IPCA RCDM REA 2040/2009 30/12/2012 29/12/2042 25,362.80
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J4 DIT   061/2001 IPCA RMEL REN 443/2011 7/3/2016 7/2/2039 6,281.48
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J7 DIT   061/2001 IPCA RCDM REA 2040/2009 30/12/2012 29/12/2042 25,362.80
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J7 DIT   061/2001 IPCA RCDM REA 2040/2009 27/03/2013 26/03/2043 28,780.53
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J8 DIT   061/2001 IPCA RCDM REA 2040/2009 30/12/2012 29/12/2042 25,362.80
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J8 DIT   061/2001 IPCA RCDM REA 2040/2009 21/03/2013 20/03/2043 28,766.50
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J9 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 14,744.22
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J9 DIT   061/2001 IPCA RCDM REA 2040/2009 13/03/2013 3/12/2043 28,747.79
  DELM. GOUVEIA IB 230 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  DELM. GOUVEIA IB 230 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  DELM. GOUVEIA IB 69 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  DELM. GOUVEIA IB 69 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  DELM. GOUVEIA IB 69 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 14,744.22

 

52 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  DELM. GOUVEIA MC 230 kV BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,812.30
  DELM. GOUVEIA MC 230 kV BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 157,240.61
  DELM. GOUVEIA MC 230 kV BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 508,861.29
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RMEL REN 443/2011 26/06/2017 25/06/2047 3,486.97
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2047 3,486.71
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2047 3,486.71
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RMEL REN 643/2014 2/8/2014 2/7/2044 18,393.79
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 7,372.11
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE DIT   061/2001 IPCA RCDM REA 2040/2009 4/9/2013 4/8/2043 9,859.19
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE DIT   061/2001 IPCA RCDM REA 2040/2009 4/9/2013 4/8/2043 39,436.72
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE DIT   061/2001 IPCA RCDM REA 2040/2009 4/9/2013 4/8/2043 19,718.36
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 7,372.11
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RMEL REN 443/2011 20/12/2015 19/12/2038 6,168.93
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBNI REA 2040/2009 24/03/2013 23/03/2044 69,552.58
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBNI REA 2040/2009 12/11/2012 12/10/2043 68,981.86
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBNI REA 2040/2009 3/3/2013 3/2/2043 318,220.15
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  DELM. GOUVEIA MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  DELM. GOUVEIA MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA1 CE DIT   061/2001 IPCA RCDM REA 2040/2009 26/01/2014 25/01/2045 23,753.08
  DELM. GOUVEIA MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA2 CE DIT   061/2001 IPCA RCDM REA 2040/2009 30/05/2013 29/05/2044 23,307.93
  DELM. GOUVEIA MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA2 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 536,945.57
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 509,188.11
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,647,832.04
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/12/2016 28/12/2044 68,033.30
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBNI REA 2040/2009 26/01/2014 25/01/2045 23,753.08
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBNI REA 2040/2009 26/01/2014 25/01/2044 15,603.13
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBNI REA 2040/2009 10/10/2012 10/9/2043 22,879.43
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RMEL REN 643/2014 15/12/2013 14/12/2030 25,393.06
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RMEL REN 643/2014 28/01/2014 27/01/2031 23,606.27
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RMEL REN 643/2014 28/02/2015 27/02/2043 43,977.20
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  DELM. GOUVEIA TR 69/13,8 kV DELM. GOUVEIA TR5 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  DELM. GOUVEIA TR 69/13,8 kV DELM. GOUVEIA TR5 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  DELM. GOUVEIA TR 69/13,8 kV DELM. GOUVEIA TR5 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  DELM. GOUVEIA TT 69/13,8 kV DELM. GOUVEIA TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  DELM. GOUVEIA TT 69/13,8 kV DELM. GOUVEIA TA1 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  DELM. GOUVEIA TT 69/13,8 kV DELM. GOUVEIA TA1 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  DELM. GOUVEIA TT 69/13,8 kV DELM. GOUVEIA TA2 CE DIT   061/2001 IPCA RCDM REA 3578/2012 12/4/2016 12/3/2046 199,059.63
  ELISEU MARTIN EL 230 kV ELISEU MARTIN LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  ELISEU MARTIN EL 69 kV ELISEU MARTIN  BERTOLINEA-02L1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ELISEU MARTIN EL 69 kV ELISEU MARTIN  BOM JESUS-02L2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ELISEU MARTIN IB 230 kV MG 230 kV ELISEU MARTIN MG1 PI IB1 RB FT MG 230 kV ELISEU MARTIN MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  ELISEU MARTIN IB 69 kV MG 230 kV ELISEU MARTIN MG1 PI IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  ELISEU MARTIN MC 230 kV TR 230/69 kV ELISEU MARTIN TR1 PI RBF FT TR 230/69 kV ELISEU MARTIN TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  ELISEU MARTIN MC 230 kV TR 230/69 kV ELISEU MARTIN TR2 PI RBF FT TR 230/69 kV ELISEU MARTIN TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  ELISEU MARTIN MC 69 kV TR 230/69 kV ELISEU MARTIN TR1 PI RBF FT TR 230/69 kV ELISEU MARTIN TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ELISEU MARTIN MC 69 kV TR 230/69 kV ELISEU MARTIN TR2 PI RBF FT TR 230/69 kV ELISEU MARTIN TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ELISEU MARTIN MC 69 kV TT 69/0 kV ELISEU MARTIN TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  ELISEU MARTIN MG 230 kV ELISEU MARTIN MG1 PI RB FT MG 230 kV ELISEU MARTIN MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 417,751.35
  ELISEU MARTIN MG 230 kV ELISEU MARTIN MG1 PI RB FT MG 230 kV ELISEU MARTIN MG1 PI 061/2001 IPCA RMEL REN 443/2011 15/01/2016 14/01/2033 29,210.24
  ELISEU MARTIN TR 230/69 kV ELISEU MARTIN TR1 PI RBF FT TR 230/69 kV ELISEU MARTIN TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 226,840.77
  ELISEU MARTIN TR 230/69 kV ELISEU MARTIN TR2 PI RBF FT TR 230/69 kV ELISEU MARTIN TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 226,840.77
  ELISEU MARTIN TT 69/0 kV ELISEU MARTIN TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 149,707.89
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 467,918.95
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 149,707.89
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 467,918.95
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 149,707.89
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 467,918.95
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 219,898.02
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA 018/2009 IPCA RBL CC 018/2009 8/3/2009 8/3/2039 655,681.68
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 12,442.81
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RMEL REN 443/2011 4/3/2016 4/2/2046 42,449.31
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62

 

53 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  EUNAPOLIS IB 138 kV MG 230 kV EUNAPOLIS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,407.76
  EUNAPOLIS IB 138 kV MG 230 kV EUNAPOLIS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 77,569.60
  EUNAPOLIS IB 138 kV MG 230 kV EUNAPOLIS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 242,447.37
  EUNAPOLIS IB 230 kV MG 230 kV EUNAPOLIS MG1 BA IB1 RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  EUNAPOLIS IB 230 kV MG 230 kV EUNAPOLIS MG1 BA IB1 RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 100,801.10
  EUNAPOLIS IB 230 kV MG 230 kV EUNAPOLIS MG1 BA IB1 RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 326,212.02
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 97,793.89
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 316,480.09
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBNI REA 4542/2014 24/11/2014 23/11/2045 209,226.83
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 97,793.89
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 316,480.09
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR3 BA RBF FT TR 230/138 kV EUNAPOLIS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  EUNAPOLIS MC 230 kV RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,896.88
  EUNAPOLIS MC 230 kV RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 122,233.54
  EUNAPOLIS MC 230 kV RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 395,571.59
  EUNAPOLIS MC 230 kV RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  EUNAPOLIS MC 230 kV RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBNI REA 4542/2014 24/11/2014 23/11/2044 222,912.66
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR3 BA RBF FT TR 230/138 kV EUNAPOLIS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2043 9,620.97
  EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 23,222.36
  EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RMEL REN 443/2011 3/1/2016 28/02/2033 28,187.04
  EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 522,684.65
  EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 495,664.41
  EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,604,066.73
  EUNAPOLIS RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 282,110.97
  EUNAPOLIS RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 267,527.21
  EUNAPOLIS RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 865,770.24
  EUNAPOLIS RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RMEL REN 643/2014 14/10/2013 13/10/2048 30,144.54
  EUNAPOLIS RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA RB FT RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,036.99
  EUNAPOLIS RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA RB FT RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 89,175.74
  EUNAPOLIS RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA RB FT RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 288,590.08
  EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,555.41
  EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 158,893.61
  EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 514,210.72
  EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,555.41
  EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 158,893.61
  EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 514,210.72
  EUNAPOLIS RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA RB FT RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,851.80
  EUNAPOLIS RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA RB FT RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 52,964.54
  EUNAPOLIS RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA RB FT RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 171,403.57
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,278.01
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 322,687.30
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,044,279.05
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,278.01
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 322,687.30
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,044,279.05
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR3 BA RBF FT TR 230/138 kV EUNAPOLIS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,278.01
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR4 BA RBF FT TR 230/138 kV EUNAPOLIS TR4 BA 061/2001 IPCA RBNI REA 4542/2014 24/11/2014 23/11/2045 29,533.31
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR4 BA RBF FT TR 230/138 kV EUNAPOLIS TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 280,330.30
  EXTREMOZ II CE 150/-75 Mvar EXTREMOZ II CE1 RN RB FT CE 150/-75 Mvar EXTREMOZ II CE1 RN 019/2010 IPCA RBL CC 019/2010 22/09/2014 23/11/2040 4,334,563.82
  EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBNI REA 10141/2021 15/08/2016 15/08/2044 131,990.95
  EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBNI REA 3208/2011 1/6/2020 1/6/2049 735,612.53
  EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2045 131,990.95
  EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 226,933.03
  EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN 019/2010 IPCA RBL CC 019/2010 22/09/2014 23/11/2040 308,329.24
  EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBNI REA 10141/2021 15/08/2016 15/08/2044 131,990.95
  EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBNI REA 3208/2011 1/6/2020 1/6/2049 735,612.53
  EXTREMOZ II IB 230 kV MG 230 kV EXTREMOZ II MG1 RN IB1 RB FT MG 230 kV EXTREMOZ II MG1 RN 019/2010 IPCA RBL CC 019/2010 22/09/2014 23/11/2040 165,677.44
  EXTREMOZ II MC 230 kV CE 150/-75 Mvar EXTREMOZ II CE1 RN RB FT CE 150/-75 Mvar EXTREMOZ II CE1 RN 019/2010 IPCA RBL CC 019/2010 22/09/2014 23/11/2040 222,883.71
  EXTREMOZ II MG 230 kV EXTREMOZ II MG1 RN RB FT MG 230 kV EXTREMOZ II MG1 RN 019/2010 IPCA RMEL REN 643/2014 31/03/2015 30/03/2030 70,010.84
  EXTREMOZ II MG 230 kV EXTREMOZ II MG1 RN RB FT MG 230 kV EXTREMOZ II MG1 RN 019/2010 IPCA RBNI REN 443/2011 16/05/2016 15/05/2047 13,466.26
  EXTREMOZ II MG 230 kV EXTREMOZ II MG1 RN RB FT MG 230 kV EXTREMOZ II MG1 RN 019/2010 IPCA RBL CC 019/2010 22/09/2014 23/11/2040 462,840.62
  EXTREMOZ II MG 230 kV EXTREMOZ II MG2 RN RB FT MG 230 kV EXTREMOZ II MG2 RN 061/2001 IPCA RBNI REA 3208/2011 12/9/2019 12/9/2052 98,002.32
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE 061/2001 IPCA RMEL REN 643/2014 9/12/2014 9/11/2028 7,684.63
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE 061/2001 IPCA RMEL REN 643/2014 9/12/2014 9/11/2028 7,684.63
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE 061/2001 IPCA RMEL REN 643/2014 19/09/2014 18/09/2028 7,692.50
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE 061/2001 IPCA RMEL REN 643/2014 9/5/2014 9/4/2028 7,676.76
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE 061/2001 IPCA RMEL REN 643/2014 9/5/2014 9/4/2028 7,676.76
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE 061/2001 IPCA RMEL REN 643/2014 9/12/2014 9/11/2028 7,684.63
  FORTALEZA BC 230 kV 50,5 MVAr FORTALEZA BC1 CE RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,846.49
  FORTALEZA BC 230 kV 50,5 MVAr FORTALEZA BC1 CE RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 166,756.08
  FORTALEZA BC 230 kV 50,5 MVAr FORTALEZA BC1 CE RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 539,655.22
  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,472.99
  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RMEL REN 643/2014 19/09/2014 18/09/2040 241,532.59
  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RMEL REN 643/2014 19/09/2014 18/09/2040 241,532.59
  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,472.99
  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,472.99
  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RMEL REN 643/2014 26/09/2014 25/09/2040 241,684.06
  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RMEL REN 643/2014 19/09/2014 18/09/2040 241,532.59
  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,472.99
  FORTALEZA CE 100/-70 MvAr FORTALEZA CE1 CE RB FT CE 100/-70 MvAr FORTALEZA CE1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,067,636.67
  FORTALEZA CE 100/-70 Mvar FORTALEZA CE2 CE RB FT CE 100/-70 MvAr FORTALEZA CE1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,067,636.67
  FORTALEZA CE 100/-70 Mvar FORTALEZA CE2 CE RB FT CE 100/-70 MvAr FORTALEZA CE1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,960,749.96
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-143 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-143 CE 061/2001 IPCA RBNI REA 2823/2011 29/07/2019 29/07/2048 484,276.94
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-143 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-143 CE 061/2001 IPCA RBNI REA 2823/2011 10/2/2020 10/2/2049 477,937.70
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-143 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-143 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-143 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-143 CE 061/2001 IPCA RBNIA REA 3631/2012     241,516.90
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE 061/2001 IPCA RBNI REA 2244/2010 9/5/2014 9/4/2034 519.97
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE 061/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2047 1,907.60
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE 061/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2047 16,690.45
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV BANABUIU /FORTALEZA C-3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV BANABUIU /FORTALEZA C-3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21

 

54 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  FORTALEZA EL 230 kV FORTALEZA LT 230 kV BANABUIU /FORTALEZA C-3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RMEL REN 643/2014 31/08/2015 30/08/2045 19,225.94
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 2040/2009 24/04/2014 23/04/2044 36,410.72
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 2040/2009 24/04/2014 23/04/2044 36,410.72
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBNI REA 2040/2009 24/04/2014 23/04/2044 36,410.72
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L1 DIT   061/2001 IPCA RCDM REA 2040/2009 1/3/2014 1/2/2045 47,421.18
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L1 DIT   061/2001 IPCA RCDM REA 2040/2009 11/2/2013 11/1/2043 9,765.00
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L1 DIT   061/2001 IPCA RCDM REA 2040/2009 11/2/2013 11/1/2043 19,530.01
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L2 DIT   061/2001 IPCA RCDM REA 2040/2009 17/11/2013 16/11/2043 29,330.11
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L2 DIT   061/2001 IPCA RCDM REA 2040/2009 19/12/2013 18/12/2044 74,449.86
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J3 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038 6,156.88
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J3 DIT   061/2001 IPCA RCDM REA 2040/2009 30/04/2013 29/04/2044 46,505.06
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J4 DIT   061/2001 IPCA RCDM REA 2040/2009 6/1/2013 31/05/2044 73,280.66
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J4 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038 6,156.88
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L3 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 14,744.22
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L3 DIT   061/2001 IPCA RCDM REA 2040/2009 3/8/2013 3/7/2044 26,476.96
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L3 DIT   061/2001 IPCA RCDM REA 2040/2009 28/11/2013 27/11/2043 29,355.83
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L4 DIT   061/2001 IPCA RCDM REA 2040/2009 24/11/2013 23/11/2043 29,346.47
  FORTALEZA EL 69 kV FORTALEZA  DISTRITO 02J9 DIT   061/2001 IPCA RCDM REA 2040/2009 12/6/2013 12/5/2044 27,056.48
  FORTALEZA EL 69 kV FORTALEZA  DISTRITO 02J9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  FORTALEZA EL 69 kV FORTALEZA  DISTRITO 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  FORTALEZA EL 69 kV FORTALEZA  DISTRITO 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02J1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02J1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02J1 DIT   061/2001 IPCA RCDM REA 2040/2009 22/09/2013 21/09/2043 19,466.09
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02J1 DIT   061/2001 IPCA RCDM REA 2040/2009 23/09/2013 22/09/2044 73,943.78
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02J1 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038 4,104.59
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02N1 DIT   061/2001 IPCA RCDM REA 2040/2009 17/01/2014 16/01/2045 23,736.45
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02N1 DIT   061/2001 IPCA RCDM REA 2040/2009 27/01/2014 26/01/2045 50,921.80
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02N1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02N1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02N1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  FORTALEZA EL 69 kV FORTALEZA  MESSEJANA 02J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  FORTALEZA EL 69 kV FORTALEZA  MESSEJANA 02J2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  FORTALEZA EL 69 kV FORTALEZA  MESSEJANA 02J2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  FORTALEZA EL 69 kV FORTALEZA  MESSEJANA 02J2 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038 6,156.88
  FORTALEZA EL 69 kV FORTALEZA  MESSEJANA 02J2 DIT   061/2001 IPCA RCDM REA 2040/2009 15/03/2014 14/03/2045 94,687.48
  FORTALEZA EL 69 kV FORTALEZA  MONDUBIM 02J6 DIT   061/2001 IPCA RCDM REA 2040/2009 9/6/2013 9/5/2043 19,441.16
  FORTALEZA EL 69 kV FORTALEZA  MONDUBIM 02J6 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038 6,156.88
  FORTALEZA EL 69 kV FORTALEZA  MONDUBIM 02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  FORTALEZA EL 69 kV FORTALEZA  MONDUBIM 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  FORTALEZA EL 69 kV FORTALEZA  MONDUBIM 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J7 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 14,744.22
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J7 DIT   061/2001 IPCA RCDM REA 2040/2009 30/04/2014 29/04/2044 19,809.09
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J8 DIT   061/2001 IPCA RCDM REA 2040/2009 26/08/2013 25/08/2044 23,470.48
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  FORTALEZA EL 69 kV FORTALEZA  TBM 02J5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  FORTALEZA EL 69 kV FORTALEZA  TBM 02J5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  FORTALEZA EL 69 kV FORTALEZA  TBM 02J5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  FORTALEZA EL 69 kV FORTALEZA  TBM 02J5 DIT   061/2001 IPCA RCDM REA 2040/2009 24/05/2013 23/05/2043 19,277.45
  FORTALEZA EL 69 kV FORTALEZA  TBM 02J5 DIT   061/2001 IPCA RCDM REA 2040/2009 24/05/2013 23/05/2044 73,234.13
  FORTALEZA EL 69 kV FORTALEZA  TBM 02J5 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038 6,156.88
  FORTALEZA IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB1 RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,547.19
  FORTALEZA IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB1 RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 24,226.52
  FORTALEZA IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB2 RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,547.19
  FORTALEZA IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB2 RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 24,226.52
  FORTALEZA IB 230 kV MG 230 kV FORTALEZA MG1 CE IB1 RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  FORTALEZA IB 230 kV MG 230 kV FORTALEZA MG1 CE IB1 RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 100,801.10
  FORTALEZA IB 230 kV MG 230 kV FORTALEZA MG1 CE IB1 RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 326,212.02
  FORTALEZA IB 230 kV MG 230 kV FORTALEZA MG1 CE IB2 RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  FORTALEZA IB 230 kV MG 230 kV FORTALEZA MG1 CE IB3 RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  FORTALEZA IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  FORTALEZA IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  FORTALEZA IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  FORTALEZA IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 14,744.22
  FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  FORTALEZA MC 13,8 kV RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE RBF FT RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  FORTALEZA MC 13,8 kV RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE RBF FT RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  FORTALEZA MC 13,8 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  FORTALEZA MC 13,8 kV TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  FORTALEZA MC 230 kV BC 230 kV 50,5 MVAr FORTALEZA BC1 CE RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 153,015.11
  FORTALEZA MC 230 kV BC 230 kV 50,5 MVAr FORTALEZA BC1 CE RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 145,104.98
  FORTALEZA MC 230 kV BC 230 kV 50,5 MVAr FORTALEZA BC1 CE RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 469,588.01
  FORTALEZA MC 230 kV CE 100/-70 MvAr FORTALEZA CE1 CE CE2 RB FT CE 100/-70 MvAr FORTALEZA CE1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,744.46
  FORTALEZA MC 230 kV RTB 230 kV 10 Mvar FORTALEZA RT5 CE RB FT RTB 230 kV 10 Mvar FORTALEZA RT5 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,896.88
  FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT2 CE RB FT RTL 230 kV 10 Mvar FORTALEZA RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RMEL REN 443/2011 25/01/2016 24/01/2046 14,075.62

 

55 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RMEL REN 443/2011 25/01/2016 24/01/2046 14,075.62
  FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT4 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBNI REA 2244/2010 9/5/2014 9/4/2046 104,891.65
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 7,372.11
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RMEL REN 443/2011 7/1/2016 30/06/2046 7,844.14
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RMEL REN 443/2011 7/1/2016 30/06/2046 7,844.14
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RMEL REN 443/2011 7/1/2016 30/06/2046 7,844.14
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 7,372.11
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RCDM REA 2040/2009 3/8/2013 3/7/2043 7,394.83
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RMEL REN 443/2011 30/06/2016 29/06/2046 7,843.54
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RMEL REN 443/2011 30/06/2016 29/06/2046 7,843.54
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RMEL REN 443/2011 30/06/2016 29/06/2046 7,843.54
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RCDM REA 2040/2009 3/8/2013 3/7/2043 7,394.83
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RMEL REN 643/2014 14/07/2014 13/07/2044 11,131.22
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBNI REA 2040/2009 30/01/2013 29/01/2043 7,372.11
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RMEL REN 443/2011 16/12/2017 15/12/2045 6,257.26
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RMEL REN 443/2011 16/12/2017 15/12/2045 6,257.26
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RMEL REN 443/2011 16/12/2017 15/12/2045 6,257.26
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBNI REA 2040/2009 30/01/2013 29/01/2043 7,372.11
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBNI REA 2040/2009 16/03/2014 15/03/2044 29,608.40
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  FORTALEZA MC 69 kV TT 69/13,8 kV FORTALEZA TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  FORTALEZA MC 69 kV TT 69/13,8 kV FORTALEZA TA1 CE DIT   061/2001 IPCA RCDM REA 2040/2009 1/3/2014 1/2/2045 23,710.59
  FORTALEZA MC 69 kV TT 69/13,8 kV FORTALEZA TA2 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 701,790.69
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 665,511.54
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,153,725.17
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RMEL REN 443/2011 23/07/2016 22/07/2033 31,685.30
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RMEL REN 443/2011 10/10/2016 10/9/2033 28,959.11
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RMEL REN 443/2011 8/1/2016 31/07/2046 12,019.49
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RMEL REN 643/2014 30/06/2015 29/06/2043 65,089.16
  FORTALEZA RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE RBF FT RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,809.15
  FORTALEZA RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE RBF FT RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  FORTALEZA RTB 230 kV 10 Mvar FORTALEZA RT5 CE RB FT RTB 230 kV 10 Mvar FORTALEZA RT5 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  FORTALEZA RTB 230 kV 10 Mvar FORTALEZA RT5 CE RB FT RTB 230 kV 10 Mvar FORTALEZA RT5 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 142,537.77
  FORTALEZA RTB 230 kV 3,33 Mvar FORTALEZA RTR1 CE RB FT RTB 230 kV 3,33 Mvar FORTALEZA RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,047.53
  FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 142,537.77
  FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 461,280.03
  FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT2 CE RB FT RTL 230 kV 10 Mvar FORTALEZA RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT4 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  FORTALEZA TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  FORTALEZA TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  FORTALEZA TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  FORTALEZA TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  FORTALEZA TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  FORTALEZA TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  FORTALEZA TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  FORTALEZA TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  FORTALEZA TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  FORTALEZA TT 69/13,8 kV FORTALEZA TA1 CE DIT   061/2001 IPCA RCDM REA 3578/2012 27/11/2016 26/11/2046 198,969.37
  FORTALEZA TT 69/13,8 kV FORTALEZA TA2 CE DIT   061/2001 IPCA RCDM REA 3578/2012 27/11/2016 26/11/2046 198,969.37
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-1 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-2 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 6137/2016 20/01/2021 20/01/2048 68,244.53
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-2 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-3 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-3 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-3 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-3 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-3 CE 061/2001 IPCA RBNI REA 6137/2016 2/3/2021 2/3/2048 68,244.53
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 7761/2019 31/12/2019 30/12/2034 36,731.04
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 6137/2016 2/3/2021 2/3/2048 68,244.53
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 6137/2016 2/3/2021 2/3/2048 68,244.53
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 7761/2019 31/12/2019 30/12/2034 36,731.04
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBNIA REA 6137/2016     68,244.53
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92

 

56 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBNI REA 6137/2016 2/3/2021 2/3/2048 68,244.53
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RMEL REN 643/2014 7/2/2014 7/1/2044 17,624.96
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBNI REA 6137/2016 21/01/2021 21/01/2048 68,244.53
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 47,729.55
  FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,322,567.42
  FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 48,936.27
  FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE BARRA1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNIA REA 6137/2016     801,502.13
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE BARRA2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNIA REA 6137/2016     801,502.13
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RMEL REN 443/2011 6/9/2017 6/8/2048 45,069.97
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 374,783.88
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNIA REA 6137/2016     81,673.94
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNIA REA 6137/2016     454,365.95
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 95,459.08
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 95,459.08
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBNI REA 2244/2010 9/5/2014 9/4/2044 48,985.56
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBNI REA 6137/2016 2/3/2021 2/3/2048 73,441.49
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 133,743.70
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 432,820.70
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 133,743.70
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 432,820.70
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBNI REA 6137/2016 2/3/2021 2/3/2048 73,441.49
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBNI REA 2244/2010 9/5/2014 9/4/2044 48,985.56
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR3 CE RB FT TR 500/230 kV FORTALEZA II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR4 CE RB FT TR 500/230 kV FORTALEZA II TR4 CE 061/2001 IPCA RBNI REA 5211/2015 5/7/2017 5/6/2047 1,056,358.52
  FORTALEZA II MC 500 kV RTB 500 kV 150 Mvar FORTALEZA II RT4 CE RB FT RTB 500 kV 150 Mvar FORTALEZA II RT4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 356,129.72
  FORTALEZA II MC 500 kV RTB 500 kV 150 Mvar FORTALEZA II RT4 CE RB FT RTB 500 kV 150 Mvar FORTALEZA II RT4 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 49,798.22
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 47,729.55
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,697.68
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,167,288.04
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,697.68
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,167,288.04
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 47,729.55
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR3 CE RB FT TR 500/230 kV FORTALEZA II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR4 CE RB FT TR 500/230 kV FORTALEZA II TR4 CE 061/2001 IPCA RBNI REA 5211/2015 5/7/2017 5/6/2048 1,915,659.08
  FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,563,194.85
  FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,482,385.32
  FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,797,288.07
  FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 2376/2010 5/1/2012 30/04/2040 42,063.16
  FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RMEL REN 443/2011 10/11/2016 10/10/2033 26,197.19
  FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 5211/2015 5/7/2017 5/6/2045 187,106.63
  FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNIA REA 6137/2016     178,094.20
  FORTALEZA II RTB 500 kV 150 Mvar FORTALEZA II RT4 CE RB FT RTB 500 kV 150 Mvar FORTALEZA II RT4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,178.08
  FORTALEZA II RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE RB FT RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,420.05
  FORTALEZA II RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE RB FT RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 237,474.56
  FORTALEZA II RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE RB FT RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 768,514.00
  FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 707,153.50
  FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 643/2014 18/10/2013 17/10/2048 39,686.38
  FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 48,936.27
  FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT2 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 643/2014 17/10/2013 16/10/2048 27,682.86
  FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT2 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 707,153.50
  FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT2 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 670,597.12
  FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT2 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,170,183.11
  FORTALEZA II TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RMEL REN 643/2014 20/10/2013 19/10/2047 49,887.49
  FORTALEZA II TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  FORTALEZA II TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,624,997.02
  FORTALEZA II TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,258,807.35
  FORTALEZA II TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  FORTALEZA II TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,624,997.02
  FORTALEZA II TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,258,807.35
  FORTALEZA II TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RMEL REN 643/2014 13/10/2013 10/12/2047 66,483.77
  FORTALEZA II TR 500/230 kV FORTALEZA II TR3 CE RB FT TR 500/230 kV FORTALEZA II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  FORTALEZA II TR 500/230 kV FORTALEZA II TR4 CE RB FT TR 500/230 kV FORTALEZA II TR4 CE 061/2001 IPCA RBNI REA 5211/2015 5/7/2017 5/6/2052 4,892,777.52
  FORTALEZA II TR 500/230 kV FORTALEZA II TRR1 CE RB FT TR 500/230 kV FORTALEZA II TRR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 571,193.59
  FORTALEZA II TR 500/230 kV FORTALEZA II TRR1 CE RB FT TR 500/230 kV FORTALEZA II TRR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 541,665.67
  FORTALEZA II TR 500/230 kV FORTALEZA II TRR1 CE RB FT TR 500/230 kV FORTALEZA II TRR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,752,935.78
  FUNIL BC 13,8 kV 3,1 Mvar FUNIL BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 26,859.07
  FUNIL BC 13,8 kV 3,1 Mvar FUNIL BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 26,859.07
  FUNIL BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,846.49
  FUNIL BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 166,756.08
  FUNIL BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 539,655.22
  FUNIL BC 230 kV 50,5 MVAr FUNIL BC2 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,846.49
  FUNIL CE 200/-100 MvAr FUNIL CE1 BA RB FT CE 200/-100 MvAr FUNIL CE1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,076,919.10
  FUNIL EL 13,8 kV FUNIL  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  FUNIL EL 13,8 kV FUNIL  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 44,630.13
  FUNIL EL 13,8 kV FUNIL  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 139,493.55
  FUNIL EL 13,8 kV FUNIL  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  FUNIL EL 13,8 kV FUNIL  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 44,630.13
  FUNIL EL 13,8 kV FUNIL  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 139,493.55
  FUNIL EL 13,8 kV FUNIL  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  FUNIL EL 13,8 kV FUNIL  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 44,630.13
  FUNIL EL 13,8 kV FUNIL  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 139,493.55
  FUNIL EL 13,8 kV FUNIL  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  FUNIL EL 13,8 kV FUNIL  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 44,630.13
  FUNIL EL 13,8 kV FUNIL  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 139,493.55
  FUNIL EL 13,8 kV FUNIL  GER1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  FUNIL EL 13,8 kV FUNIL  GER1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 44,630.13
  FUNIL EL 13,8 kV FUNIL  GER1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 139,493.55
  FUNIL EL 138 kV FUNIL  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 159,761.08
  FUNIL EL 138 kV FUNIL  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 158,053.26
  FUNIL EL 138 kV FUNIL  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 159,761.08

 

57 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  FUNIL EL 138 kV FUNIL  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 159,761.08
  FUNIL EL 138 kV FUNIL  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 159,761.08
  FUNIL EL 138 kV FUNIL  DIST4 DIT   061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044 14,046.95
  FUNIL EL 138 kV FUNIL  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 159,761.08
  FUNIL EL 138 kV FUNIL  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 158,053.26
  FUNIL EL 138 kV FUNIL  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 494,002.78
  FUNIL EL 138 kV FUNIL  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 159,761.08
  FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-2 BA RB FT LT 230 kV FUNIL /ITAPEBI C-2 BA 061/2001 IPCA RBNI REA 5861/2016 6/9/2016 6/8/2044 8,843.15
  FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-2 BA RB FT LT 230 kV FUNIL /ITAPEBI C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-2 BA RB FT LT 230 kV FUNIL /ITAPEBI C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-2 BA RB FT LT 230 kV FUNIL /ITAPEBI C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RMEL REN 443/2011 13/03/2016 3/12/2046 14,127.21
  FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RMEL REN 443/2011 13/03/2016 3/12/2046 14,127.21
  FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RMEL REN 443/2011 24/04/2016 23/04/2039 19,660.97
  FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RMEL REN 443/2011 13/03/2016 3/12/2046 14,127.21
  FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RMEL REN 443/2011 5/1/2016 30/04/2046 14,179.86
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RMEL REN 443/2011 5/1/2016 30/04/2046 14,179.86
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RMEL REN 443/2011 5/1/2016 30/04/2046 14,179.86
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 85,715.73
  FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,720.57
  FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 27,424.24
  FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,720.57
  FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 27,424.24
  FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 85,715.73
  FUNIL IB 138 kV MG 230 kV FUNIL MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,703.14
  FUNIL IB 230 kV MG 230 kV FUNIL MG1 BA IB1 RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  FUNIL IB 230 kV MG 230 kV FUNIL MG1 BA IB1 RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  FUNIL IB 230 kV MG 230 kV FUNIL MG1 BA IB1 RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 374,783.88
  FUNIL MC 115 kV TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 109,389.11
  FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,904.70
  FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 124,724.00
  FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,904.70
  FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 124,724.00
  FUNIL MC 138 kV TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 109,389.11
  FUNIL MC 138 kV TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 108,219.76
  FUNIL MC 138 kV TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 109,389.11
  FUNIL MC 138 kV TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 108,219.76
  FUNIL MC 138 kV TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 338,245.86
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,155.44
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 105,409.24
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 341,124.88
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,155.44
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 105,409.24
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,155.44
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 105,409.24
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 341,124.88
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBNI REA 2173/2009 24/01/2013 23/01/2041 137,532.35
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,155.44
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 105,409.24
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 341,124.88
  FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RMEL REN 443/2011 15/04/2016 14/04/2049 34,347.64
  FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RMEL REN 643/2014 12/7/2015 12/6/2047 102,571.17
  FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,241.74
  FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 133,940.24
  FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 433,456.73
  FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC2 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,241.74
  FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC2 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC2 BA 061/2001 IPCA RMEL REN 443/2011 15/04/2016 14/04/2049 100,674.30
  FUNIL MC 230 kV RTB 230 kV 20 Mvar FUNIL RT1 BA RB FT RTB 230 kV 20 Mvar FUNIL RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 142,534.45
  FUNIL MC 230 kV RTB 230 kV 20 Mvar FUNIL RT1 BA RB FT RTB 230 kV 20 Mvar FUNIL RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 135,166.11
  FUNIL MC 230 kV RTB 230 kV 20 Mvar FUNIL RT1 BA RB FT RTB 230 kV 20 Mvar FUNIL RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 437,423.91
  FUNIL MC 230 kV RTB 230 kV 22,2 Mvar FUNIL RT2 BA RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 142,534.45
  FUNIL MC 230 kV RTB 230 kV 22,2 Mvar FUNIL RT2 BA RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 135,166.11
  FUNIL MC 230 kV RTB 230 kV 22,2 Mvar FUNIL RT2 BA RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 437,423.91
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RMEL REN 443/2011 25/03/2015 24/03/2038 18,944.65
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBNI REA 2173/2009 24/01/2013 23/01/2041 144,133.28
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RMEL REN 643/2014 2/7/2014 2/6/2028 17,359.26
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2029 16,460.10
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RMEL REN 643/2014 17/08/2014 16/08/2044 56,014.98
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RMEL REN 443/2011 30/06/2016 29/06/2044 45,766.62
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RMEL REN 443/2011 26/02/2016 25/02/2033 28,173.19
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 729,418.01
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 691,710.67
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,238,510.66
  FUNIL RTB 230 kV 20 Mvar FUNIL RT1 BA RB FT RTB 230 kV 20 Mvar FUNIL RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 198,548.97
  FUNIL RTB 230 kV 20 Mvar FUNIL RT1 BA RB FT RTB 230 kV 20 Mvar FUNIL RT1 BA 061/2001 IPCA RMEL REN 643/2014 2/12/2014 2/11/2049 30,395.35
  FUNIL RTB 230 kV 22,2 Mvar FUNIL RT2 BA RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 282,110.97
  FUNIL RTB 230 kV 22,2 Mvar FUNIL RT2 BA RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 267,527.21
  FUNIL RTB 230 kV 22,2 Mvar FUNIL RT2 BA RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 865,770.24
  FUNIL RTB 230 kV 7,4 MVAr FUNIL RTR1 BA RB FT RTB 230 kV 7,4 MVAr FUNIL RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,036.99
  FUNIL RTB 230 kV 7,4 MVAr FUNIL RTR1 BA RB FT RTB 230 kV 7,4 MVAr FUNIL RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 89,175.74
  FUNIL RTB 230 kV 7,4 MVAr FUNIL RTR1 BA RB FT RTB 230 kV 7,4 MVAr FUNIL RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 288,590.08
  FUNIL TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 187,048.93

 

58 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  FUNIL TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 185,049.41
  FUNIL TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 578,380.49
  FUNIL TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 140,286.27
  FUNIL TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 138,786.63
  FUNIL TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 433,784.03
  FUNIL TR 138/13,8 kV FUNIL TRR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 140,286.27
  FUNIL TR 138/13,8 kV FUNIL TRR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 138,786.63
  FUNIL TR 138/13,8 kV FUNIL TRR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 433,784.03
  FUNIL TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,278.01
  FUNIL TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 322,687.30
  FUNIL TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,044,279.05
  FUNIL TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,278.01
  FUNIL TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 322,687.30
  FUNIL TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,044,279.05
  FUNIL TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBNI REA 2173/2009 24/01/2013 23/01/2047 1,292,170.68
  FUNIL TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,278.01
  FUNIL TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 322,687.30
  G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC1 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC2 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC3 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC4 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC5 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC6 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RMEL REN 643/2014 2/2/2014 2/1/2042 34,485.47
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2045 1,122,659.58
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RMEL REN 443/2011 15/07/2016 14/07/2046 14,497.69
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV CATU /G.MANGABEIRA C-1 BA RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2045 1,122,659.58
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RMEL REN 443/2011 18/03/2016 17/03/2049 98,093.57
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV P.DO CAVALO /G.MANGABEIRA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 192,089.95
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV P.DO CAVALO /G.MANGABEIRA C-1 BA DIT   061/2001 IPCA RMEL REN 443/2011 28/02/2016 27/02/2046 12,422.94
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV P.DO CAVALO /G.MANGABEIRA C-1 BA DIT   061/2001 IPCA RMEL REN 443/2011 28/02/2016 27/02/2046 12,422.94
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV TOMBA /G.MANGABEIRA C-1 BA RB FT LT 230 kV TOMBA /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV TOMBA /G.MANGABEIRA C-2 BA RB FT LT 230 kV TOMBA /G.MANGABEIRA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST1 DIT   061/2001 IPCA RMEL REN 443/2011 7/7/2016 7/6/2046 212.35
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST2 DIT   061/2001 IPCA RMEL REN 443/2011 7/7/2016 7/6/2046 1,472.13
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST3 DIT   061/2001 IPCA RMEL REN 443/2011 7/7/2016 7/6/2046 1,472.13
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST6 DIT   061/2001 IPCA RMEL REN 443/2011 7/7/2016 7/6/2046 1,472.13
  G.MANGABEIRA IB 230 kV MG 230 kV G.MANGABEIRA MG1 BA IB1 RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  G.MANGABEIRA IB 69 kV MG 230 kV G.MANGABEIRA MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC1 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC2 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC3 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC4 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC5 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC6 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  G.MANGABEIRA MC 13,8 kV TR 230/69 kV G.MANGABEIRA TR1 BA MC1 RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  G.MANGABEIRA MC 13,8 kV TR 230/69 kV G.MANGABEIRA TR1 BA MC2 RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  G.MANGABEIRA MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  G.MANGABEIRA MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RMEL REN 443/2011 19/06/2016 18/06/2046 14,232.51
  G.MANGABEIRA MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RMEL REN 443/2011 19/06/2016 18/06/2046 14,232.51
  G.MANGABEIRA MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RMEL REN 443/2011 19/06/2016 18/06/2046 14,232.51
  G.MANGABEIRA MC 230 kV TR 230/69 kV G.MANGABEIRA TR2 BA RBF FT TR 230/69 kV G.MANGABEIRA TR2 BA 061/2001 IPCA RBNI REA 2823/2011 18/05/2015 17/05/2046 968,705.77
  G.MANGABEIRA MC 69 kV TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  G.MANGABEIRA MC 69 kV TR 230/69 kV G.MANGABEIRA TR2 BA RBF FT TR 230/69 kV G.MANGABEIRA TR2 BA 061/2001 IPCA RBNI REA 2823/2011 18/05/2015 17/05/2045 413,849.25
  G.MANGABEIRA MC 69 kV TT 69/0 kV G.MANGABEIRA TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  G.MANGABEIRA MC 69 kV TT 69/13,8 kV G.MANGABEIRA TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBNI REA 2823/2011 18/05/2015 17/05/2043 229,335.18
  G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 544,426.20
  G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 516,282.02
  G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,670,789.34
  G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2042 72,031.55
  G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RMEL REN 443/2011 15/02/2016 14/02/2046 215.78
  G.MANGABEIRA RTS 13,8 kV 5 Mvar G.MANGABEIRA RT1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  G.MANGABEIRA RTS 13,8 kV 5 Mvar G.MANGABEIRA RT1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  G.MANGABEIRA RTS 13,8 kV 5 Mvar G.MANGABEIRA RT1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 353,089.34
  G.MANGABEIRA TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  G.MANGABEIRA TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  G.MANGABEIRA TR 230/69 kV G.MANGABEIRA TR2 BA RBF FT TR 230/69 kV G.MANGABEIRA TR2 BA 061/2001 IPCA RBNI REA 2823/2011 18/05/2015 17/05/2049 1,298,781.57
  G.MANGABEIRA TT 69/0 kV G.MANGABEIRA TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  G.MANGABEIRA TT 69/13,8 kV G.MANGABEIRA TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  GOIANINHA BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,662.17
  GOIANINHA BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 99,586.10
  GOIANINHA CS 20/-9 MVAr GOIANINHA CS1 PE RBF FT CS 20/-9 MVAr GOIANINHA CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 704,172.41
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2046 12,395.50
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2046 12,395.50
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2046 12,395.50
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB RB FT LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV RECIFE II /GOIANINHA C-2 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  GOIANINHA EL 69 kV GOIANINHA  DIST1 DIT   061/2001 IPCA RMEL REN 643/2014 11/12/2015 11/11/2045 2,957.40
  GOIANINHA EL 69 kV GOIANINHA  DIST1 DIT   061/2001 IPCA RMEL REN 643/2014 29/09/2015 28/09/2045 3,001.59
  GOIANINHA EL 69 kV GOIANINHA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  GOIANINHA EL 69 kV GOIANINHA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  GOIANINHA EL 69 kV GOIANINHA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  GOIANINHA EL 69 kV GOIANINHA  DIST10 DIT   061/2001 IPCA RCDM REN 905/2020 3/11/2019 3/10/2046 425,357.85
  GOIANINHA EL 69 kV GOIANINHA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  GOIANINHA EL 69 kV GOIANINHA  DIST2 DIT   061/2001 IPCA RMEL REN 643/2014 30/09/2015 29/09/2045 3,001.82
  GOIANINHA EL 69 kV GOIANINHA  DIST3 DIT   061/2001 IPCA RMEL REN 443/2011 10/1/2015 30/09/2045 879.67
  GOIANINHA EL 69 kV GOIANINHA  DIST3 DIT   061/2001 IPCA RMEL REN 643/2014 30/09/2015 29/09/2045 3,001.82
  GOIANINHA EL 69 kV GOIANINHA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  GOIANINHA EL 69 kV GOIANINHA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84

 

59 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  GOIANINHA EL 69 kV GOIANINHA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  GOIANINHA EL 69 kV GOIANINHA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  GOIANINHA EL 69 kV GOIANINHA  DIST4 DIT   061/2001 IPCA RMEL REN 443/2011 10/1/2015 30/09/2045 2,977.64
  GOIANINHA EL 69 kV GOIANINHA  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  GOIANINHA EL 69 kV GOIANINHA  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  GOIANINHA EL 69 kV GOIANINHA  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  GOIANINHA EL 69 kV GOIANINHA  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  GOIANINHA EL 69 kV GOIANINHA  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  GOIANINHA EL 69 kV GOIANINHA  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  GOIANINHA EL 69 kV GOIANINHA  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  GOIANINHA EL 69 kV GOIANINHA  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  GOIANINHA EL 69 kV GOIANINHA  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  GOIANINHA EL 69 kV GOIANINHA  DIST7 DIT   061/2001 IPCA RMEL REN 643/2014 29/09/2015 28/09/2045 3,001.59
  GOIANINHA EL 69 kV GOIANINHA  DIST8 DIT   061/2001 IPCA RMEL REN 643/2014 18/03/2015 17/03/2045 3,065.11
  GOIANINHA EL 69 kV GOIANINHA  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  GOIANINHA EL 69 kV GOIANINHA  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  GOIANINHA EL 69 kV GOIANINHA  DIST9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  GOIANINHA EL 69 kV GOIANINHA  DIST9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  GOIANINHA EL 69 kV GOIANINHA  DIST9 DIT   061/2001 IPCA RMEL REN 643/2014 18/03/2015 17/03/2045 3,065.11
  GOIANINHA IB 13,8 kV MG 230 kV GOIANINHA MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,561.89
  GOIANINHA IB 230 kV MG 230 kV GOIANINHA MG1 PE IB1 RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  GOIANINHA IB 230 kV MG 230 kV GOIANINHA MG1 PE IB1 RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 100,801.10
  GOIANINHA IB 230 kV MG 230 kV GOIANINHA MG1 PE IB1 RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 326,212.02
  GOIANINHA IB 69 kV MG 230 kV GOIANINHA MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  GOIANINHA IB 69 kV MG 230 kV GOIANINHA MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  GOIANINHA IB 69 kV MG 230 kV GOIANINHA MG1 PE IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 25,928.99
  GOIANINHA IB 69 kV MG 230 kV GOIANINHA MG1 PE IB3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 25,928.99
  GOIANINHA MC 13,8 kV CS 20/-9 MVAr GOIANINHA CS1 PE MC1 RBF FT CS 20/-9 MVAr GOIANINHA CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,419.78
  GOIANINHA MC 13,8 kV CS 20/-9 MVAr GOIANINHA CS1 PE MC2 RBF FT CS 20/-9 MVAr GOIANINHA CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,419.78
  GOIANINHA MC 13,8 kV RTS 13,8 kV 5 Mvar GOIANINHA RT1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 34,310.42
  GOIANINHA MC 13,8 kV RTS 13,8 kV 5 Mvar GOIANINHA RT2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 34,310.42
  GOIANINHA MC 13,8 kV TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  GOIANINHA MC 13,8 kV TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  GOIANINHA MC 230 kV RTB 230 kV 10 MVAr GOIANINHA RT1 PE RB FT RTB 230 kV 10 MVAr GOIANINHA RT1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,896.88
  GOIANINHA MC 230 kV RTB 230 kV 10 MVAr GOIANINHA RT1 PE RB FT RTB 230 kV 10 MVAr GOIANINHA RT1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 122,233.54
  GOIANINHA MC 230 kV TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  GOIANINHA MC 230 kV TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  GOIANINHA MC 230 kV TR 230/69 kV GOIANINHA TR3 PE RBF FT TR 230/69 kV GOIANINHA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  GOIANINHA MC 230 kV TR 230/69 kV GOIANINHA TR4 PE RBF FT TR 230/69 kV GOIANINHA TR4 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2041 574,670.12
  GOIANINHA MC 69 kV BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  GOIANINHA MC 69 kV BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  GOIANINHA MC 69 kV BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  GOIANINHA MC 69 kV BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RMEL REN 643/2014 30/06/2014 29/06/2046 36,724.33
  GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR3 PE RBF FT TR 230/69 kV GOIANINHA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR4 PE RBF FT TR 230/69 kV GOIANINHA TR4 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2040 1,031,720.99
  GOIANINHA MC 69 kV TT 69/0 kV GOIANINHA TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  GOIANINHA MC 69 kV TT 69/0 kV GOIANINHA TA2 PE DIT   061/2001 IPCA RCDM REA 2412/2010 14/08/2012 13/08/2043 266,525.99
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 599,837.44
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2050 59,433.25
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2049 15,700.64
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2039 40,221.18
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 568,828.78
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,840,840.89
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 28,817.16
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBNI REN 905/2020 3/11/2019 3/10/2050 35,155.78
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 23,222.36
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RMEL REN 643/2014 13/12/2015 12/12/2047 398,460.72
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RMEL REN 643/2014 28/09/2015 27/09/2045 6,002.72
  GOIANINHA RTB 230 kV 10 MVAr GOIANINHA RT1 PE RB FT RTB 230 kV 10 MVAr GOIANINHA RT1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 176,208.84
  GOIANINHA RTS 13,8 kV 5 Mvar GOIANINHA RT1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  GOIANINHA RTS 13,8 kV 5 Mvar GOIANINHA RT2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  GOIANINHA TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  GOIANINHA TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  GOIANINHA TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  GOIANINHA TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  GOIANINHA TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  GOIANINHA TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  GOIANINHA TR 230/69 kV GOIANINHA TR3 PE RBF FT TR 230/69 kV GOIANINHA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  GOIANINHA TR 230/69 kV GOIANINHA TR4 PE RBF FT TR 230/69 kV GOIANINHA TR4 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2052 1,233,896.17
  GOIANINHA TT 69/0 kV GOIANINHA TA1 PE DIT   061/2001 IPCA RCDM REA 5931/2016 17/12/2017 16/12/2047 203,933.21
  GOIANINHA TT 69/0 kV GOIANINHA TA2 PE DIT   061/2001 IPCA RCDM REA 2412/2010 14/08/2012 13/08/2042 247,511.00
  IBIAPINA II BC 69 kV 23 Mvar IBIAPINA II BC1 CE ICG   010/2011 IPCA RICG CC 010/2011 9/12/2016 13/10/2041 229,665.32
  IBIAPINA II EL 230 kV IBIAPINA II LT 230 kV IBIAPINA II /SOBRAL II C-1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBNI REA 10142/2021 2/10/2021 2/10/2050 131,990.95
  IBIAPINA II EL 230 kV IBIAPINA II LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE RB FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE 061/2001 IPCA RBNI REA 10142/2021 2/10/2021 2/10/2049 131,990.95
  IBIAPINA II IB 230 kV MG 230 kV IBIAPINA II MG1 CE IB1 RB FT MG 230 kV IBIAPINA II MG1 CE 010/2011 IPCA RBL CC 010/2011 9/12/2016 13/10/2041 238,626.27
  IBIAPINA II IB 69 kV MG 69 kV IBIAPINA II MG1 CE IB1 ICG   010/2011 IPCA RICG CC 010/2011 9/12/2016 13/10/2041 88,813.25
  IBIAPINA II MC 230 kV TR 230/69 kV IBIAPINA II TR1 CE ICG   010/2011 IPCA RICG CC 010/2011 9/12/2016 13/10/2041 318,489.56
  IBIAPINA II MC 230 kV TR 230/69 kV IBIAPINA II TR2 CE ICG   010/2011 IPCA RICG CC 010/2011 9/12/2016 13/10/2041 318,489.56
  IBIAPINA II MC 69 kV BC 69 kV 23 Mvar IBIAPINA II BC1 CE ICG   010/2011 IPCA RICG CC 010/2011 9/12/2016 13/10/2041 156,759.83
  IBIAPINA II MC 69 kV TR 230/69 kV IBIAPINA II TR1 CE ICG   010/2011 IPCA RICG CC 010/2011 9/12/2016 13/10/2041 129,545.42
  IBIAPINA II MC 69 kV TR 230/69 kV IBIAPINA II TR2 CE ICG   010/2011 IPCA RICG CC 010/2011 9/12/2016 13/10/2041 129,545.42
  IBIAPINA II MC 69 kV TT 69/69 kV IBIAPINA II TA1 CE ICG   010/2011 IPCA RICG CC 010/2011 9/12/2016 13/10/2041 54,673.62
  IBIAPINA II MG 230 kV IBIAPINA II MG1 CE RB FT MG 230 kV IBIAPINA II MG1 CE 010/2011 IPCA RBL CC 010/2011 9/12/2016 13/10/2041 675,647.19
  IBIAPINA II MG 69 kV IBIAPINA II MG1 CE ICG   010/2011 IPCA RICG CC 010/2011 9/12/2016 13/10/2041 56,142.47
  IBIAPINA II TR 230/69 kV IBIAPINA II TR1 CE ICG   010/2011 IPCA RICG CC 010/2011 9/12/2016 13/10/2041 730,559.83
  IBIAPINA II TR 230/69 kV IBIAPINA II TR2 CE ICG   010/2011 IPCA RICG CC 010/2011 9/12/2016 13/10/2041 730,559.83
  IBIAPINA II TT 69/69 kV IBIAPINA II TA1 CE ICG   010/2011 IPCA RICG CC 010/2011 9/12/2016 13/10/2041 146,867.10
  IBICOARA EL 138 kV IBICOARA  DIST1 DIT   010/2007 IPCA RCDM REA 1523/2008 24/02/2011 24/02/2039 587,887.26
  IBICOARA EL 138 kV IBICOARA  DIST1 DIT   010/2007 IPCA RMEL REN 643/2014 27/09/2014 26/09/2044 1,429.32
  IBICOARA EL 138 kV IBICOARA  DIST2 DIT   010/2007 IPCA RCDM REA 1523/2008 24/02/2011 24/02/2039 587,887.26
  IBICOARA EL 230 kV IBICOARA LT 230 kV BRUMADO II /IBICOARA C-1 BA RB FT LT 230 kV BRUMADO II /IBICOARA C-1 BA 010/2007 IPCA RBL CC 010/2007 6/11/2007 6/11/2037 390,463.60
  IBICOARA IB 138 kV MG 500 kV IBICOARA MG2 BA IB1 DIT   010/2007 IPCA RPEC CC 010/2007 6/11/2007 6/11/2037 89,550.20
  IBICOARA IB 230 kV MG 500 kV IBICOARA MG2 BA IB1 RB FT MG 500 kV IBICOARA MG2 BA 010/2007 IPCA RBL CC 010/2007 6/11/2007 6/11/2037 193,893.75
  IBICOARA IB 500 kV MG 500 kV IBICOARA MG2 BA IB3 RB FT MG 500 kV IBICOARA MG2 BA 010/2007 IPCA RBL CC 010/2007 6/11/2007 6/11/2037 318,692.47
  IBICOARA MC 138 kV TR 230/138 kV IBICOARA TR2 BA RBF FT TR 230/138 kV IBICOARA TR2 BA 010/2007 IPCA RBL CC 010/2007 6/11/2007 6/11/2037 165,946.65
  IBICOARA MC 138 kV TR 230/138 kV IBICOARA TR3 BA RBF FT TR 230/138 kV IBICOARA TR3 BA 010/2007 IPCA RBL CC 010/2007 6/11/2007 6/11/2037 165,946.65
  IBICOARA MC 230 kV TR 230/138 kV IBICOARA TR2 BA RBF FT TR 230/138 kV IBICOARA TR2 BA 010/2007 IPCA RBL CC 010/2007 6/11/2007 6/11/2037 338,778.68
  IBICOARA MC 230 kV TR 230/138 kV IBICOARA TR3 BA RBF FT TR 230/138 kV IBICOARA TR3 BA 010/2007 IPCA RBL CC 010/2007 6/11/2007 6/11/2037 338,778.68
  IBICOARA MC 230 kV TR 500/230 kV IBICOARA TR1 BA RB FT TR 500/230 kV IBICOARA TR1 BA 010/2007 IPCA RBL CC 010/2007 6/11/2007 6/11/2037 338,778.68
  IBICOARA MC 230 kV TR 500/230 kV IBICOARA TR3 BA RB FT TR 500/230 kV IBICOARA TR3 BA 010/2007 IPCA RBNI REA 5211/2015 6/10/2019 6/10/2043 488,995.73
  IBICOARA MC 500 kV TR 500/230 kV IBICOARA TR1 BA RB FT TR 500/230 kV IBICOARA TR1 BA 010/2007 IPCA RBNI REA 5861/2016 25/05/2018 24/05/2033 102,596.40
  IBICOARA MC 500 kV TR 500/230 kV IBICOARA TR1 BA RB FT TR 500/230 kV IBICOARA TR1 BA 010/2007 IPCA RMEL REN 443/2011 20/12/2015 19/12/2045 3,876.06
  IBICOARA MC 500 kV TR 500/230 kV IBICOARA TR1 BA RB FT TR 500/230 kV IBICOARA TR1 BA 010/2007 IPCA RBL CC 010/2007 6/11/2007 6/11/2037 804,287.12
  IBICOARA MC 500 kV TR 500/230 kV IBICOARA TR3 BA RB FT TR 500/230 kV IBICOARA TR3 BA 010/2007 IPCA RBNI REA 5211/2015 6/10/2019 6/10/2047 1,346,483.91
  IBICOARA MG 500 kV IBICOARA MG2 BA RB FT MG 500 kV IBICOARA MG2 BA 010/2007 IPCA RBNI REA 5211/2015 6/10/2019 6/10/2051 51,151.79
  IBICOARA MG 500 kV IBICOARA MG4 BA RB FT MG 500 kV IBICOARA MG4 BA 061/2001 IPCA RMEL REN 443/2011 28/10/2016 27/10/2031 1,050.52

 

60 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  IBICOARA MG 500 kV IBICOARA MG4 BA RB FT MG 500 kV IBICOARA MG4 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2013 19/12/2047 54,338.82
  IBICOARA TR 230/138 kV IBICOARA TR2 BA RBF FT TR 230/138 kV IBICOARA TR2 BA 010/2007 IPCA RBL CC 010/2007 6/11/2007 6/11/2037 269,110.64
  IBICOARA TR 230/138 kV IBICOARA TR3 BA RBF FT TR 230/138 kV IBICOARA TR3 BA 010/2007 IPCA RBL CC 010/2007 6/11/2007 6/11/2037 269,110.64
  IBICOARA TR 500/230 kV IBICOARA TR1 BA RB FT TR 500/230 kV IBICOARA TR1 BA 010/2007 IPCA RBL CC 010/2007 6/11/2007 6/11/2037 1,556,926.19
  IBICOARA TR 500/230 kV IBICOARA TR3 BA RB FT TR 500/230 kV IBICOARA TR3 BA 010/2007 IPCA RBNI REA 5211/2015 6/10/2019 6/10/2054 4,248,157.33
  IBICOARA TR 500/230 kV IBICOARA TRR1 BA RB FT TR 500/230 kV IBICOARA TRR1 BA 010/2007 IPCA RBL CC 010/2007 6/11/2007 6/11/2037 518,975.40
  ICO EL 230 kV ICO LT 230 kV BANABUIU /ICO C-1 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  ICO EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  ICO EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  ICO EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  ICO EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RMEL REN 643/2014 20/07/2014 19/07/2044 18,630.71
  ICO EL 69 kV ICO  CEDRO 02J9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ICO EL 69 kV ICO  CEDRO 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ICO EL 69 kV ICO  CEDRO 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ICO EL 69 kV ICO  ICO II 02J5 DIT   061/2001 IPCA RCDM REA 1814/2009 29/01/2013 28/01/2043 394,465.91
  ICO EL 69 kV ICO  IGUATU 02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ICO EL 69 kV ICO  IGUATU 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ICO EL 69 kV ICO  IGUATU 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ICO EL 69 kV ICO  OROS 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ICO EL 69 kV ICO  OROS 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ICO EL 69 kV ICO  OROS 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ICO EL 69 kV ICO  S.M.DO OES.02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ICO EL 69 kV ICO  S.M.DO OES.02J8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ICO EL 69 kV ICO  S.M.DO OES.02J8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ICO EL 69 kV ICO  S.M.DO OES.02J8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ICO IB 230 kV MG 230 kV ICO MG1 CE IB1 RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  ICO IB 69 kV MG 230 kV ICO MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  ICO IB 69 kV MG 230 kV ICO MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  ICO IB 69 kV MG 230 kV ICO MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  ICO MC 230 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  ICO MC 230 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  ICO MC 230 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  ICO MC 230 kV TR 230/69 kV ICO TR2 CE RBF FT TR 230/69 kV ICO TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  ICO MC 69 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ICO MC 69 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  ICO MC 69 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  ICO MC 69 kV TR 230/69 kV ICO TR2 CE RBF FT TR 230/69 kV ICO TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 426,336.71
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 404,297.19
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,308,384.56
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RMEL REN 643/2014 21/06/2013 20/06/2030 24,780.25
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RMEL REN 643/2014 2/5/2014 2/4/2031 23,631.87
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/09/2016 28/09/2033 28,921.02
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBNI REA 1814/2009 20/01/2013 19/01/2041 41,619.11
  ICO TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  ICO TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  ICO TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  ICO TR 230/69 kV ICO TR2 CE RBF FT TR 230/69 kV ICO TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  ICO TT 69/13,8 kV ICO TA1 CE DIT   061/2001 IPCA RCDM REA 3578/2012 18/02/2017 17/02/2047 200,039.49
  IGAPORA II BC 230 kV 50 Mvar IGAPORA II BC1 BA RB FT BC 230 kV 50 Mvar IGAPORA II BC1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040 218,705.34
  IGAPORA II BC 69 kV 21 Mvar IGAPORA II BC1 BA ICG   020/2010 IPCA RICG CC 020/2010 6/2/2014 23/11/2040 152,820.36
  IGAPORA II BC 69 kV 21 Mvar IGAPORA II BC2 BA ICG   020/2010 IPCA RICG CC 020/2010 6/2/2014 23/11/2040 152,820.36
  IGAPORA II EL 230 kV IGAPORA II LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA RB FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040 259,122.32
  IGAPORA II EL 230 kV IGAPORA II LT 230 kV IGAPORA II /IGAPORA III C-1 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 467,758.67
  IGAPORA II EL 230 kV IGAPORA II LT 230 kV IGAPORA II /IGAPORA III C-2 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 467,758.67
  IGAPORA II EL 69 kV IGAPORA II  CAETITE DIT   020/2010 IPCA RCDM REN 443/2011 7/8/2016 7/7/2039 382,127.20
  IGAPORA II EL 69 kV IGAPORA II  GUANAMBI DIT   020/2010 IPCA RCDM REN 443/2011 7/8/2016 7/7/2039 382,127.20
  IGAPORA II IB 230 kV MG 230 kV IGAPORA II MG1 BA IB1 RB FT MG 230 kV IGAPORA II MG1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040 139,236.62
  IGAPORA II IB 69 kV MG 69 kV IGAPORA II MG1 BA IB1 ICG   020/2010 IPCA RICG CC 020/2010 6/2/2014 23/11/2040 60,445.38
  IGAPORA II MC 230 kV BC 230 kV 50 Mvar IGAPORA II BC1 BA RB FT BC 230 kV 50 Mvar IGAPORA II BC1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040 209,098.56
  IGAPORA II MC 230 kV TR 230/69 kV IGAPORA II TR1 BA ICG   020/2010 IPCA RICG CC 020/2010 6/2/2014 23/11/2040 217,873.84
  IGAPORA II MC 230 kV TR 230/69 kV IGAPORA II TR2 BA ICG   020/2010 IPCA RICG CC 020/2010 6/2/2014 23/11/2040 217,873.84
  IGAPORA II MC 230 kV TR 230/69 kV IGAPORA II TR3 BA ICG   020/2010 IPCA RICGNI REA 4316/2013 7/4/2016 30/06/2032 964,399.86
  IGAPORA II MC 69 kV BC 69 kV 21 Mvar IGAPORA II BC1 BA ICG   020/2010 IPCA RICG CC 020/2010 6/2/2014 23/11/2040 107,642.75
  IGAPORA II MC 69 kV BC 69 kV 21 Mvar IGAPORA II BC2 BA ICG   020/2010 IPCA RICG CC 020/2010 6/2/2014 23/11/2040 107,642.75
  IGAPORA II MC 69 kV TR 230/69 kV IGAPORA II TR1 BA ICG   020/2010 IPCA RICG CC 020/2010 6/2/2014 23/11/2040 88,645.03
  IGAPORA II MC 69 kV TR 230/69 kV IGAPORA II TR2 BA ICG   020/2010 IPCA RICG CC 020/2010 6/2/2014 23/11/2040 88,645.03
  IGAPORA II MC 69 kV TR 230/69 kV IGAPORA II TR3 BA ICG   020/2010 IPCA RICGNI REA 4316/2013 7/4/2016 30/06/2032 355,920.29
  IGAPORA II MC 69 kV TT 69/0 kV IGAPORA II TT1 BA ICG   020/2010 IPCA RICG CC 020/2010 6/2/2014 23/11/2040 37,807.73
  IGAPORA II MG 230 kV IGAPORA II MG1 BA RB FT MG 230 kV IGAPORA II MG1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040 393,302.64
  IGAPORA II MG 69 kV IGAPORA II MG1 BA ICG   020/2010 IPCA RICG CC 020/2010 6/2/2014 23/11/2040 38,073.37
  IGAPORA II MG 69 kV IGAPORA II MG1 BA ICG   020/2010 IPCA RICGNI REA 4316/2013 7/4/2016 30/06/2032 146,071.05
  IGAPORA II MG 69 kV IGAPORA II MG1 BA ICG   020/2010 IPCA RICGNI REN 643/2014 7/8/2016 7/7/2049 65,343.24
  IGAPORA II TR 230/69 kV IGAPORA II TR1 BA ICG   020/2010 IPCA RICG CC 020/2010 6/2/2014 23/11/2040 687,153.75
  IGAPORA II TR 230/69 kV IGAPORA II TR2 BA ICG   020/2010 IPCA RICG CC 020/2010 6/2/2014 23/11/2040 687,153.75
  IGAPORA II TR 230/69 kV IGAPORA II TR3 BA ICG   020/2010 IPCA RICGNI REA 4316/2013 7/4/2016 30/06/2032 1,507,270.85
  IGAPORA II TT 69/0 kV IGAPORA II TT1 BA ICG   020/2010 IPCA RICG CC 020/2010 6/2/2014 23/11/2040 48,882.32
  IGAPORA III EL 230 kV IGAPORA III LT 230 kV IGAPORA II /IGAPORA III C-1 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 467,758.67
  IGAPORA III EL 230 kV IGAPORA III LT 230 kV IGAPORA II /IGAPORA III C-2 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 467,758.67
  IGAPORA III EL 230 kV IGAPORA III LT 230 kV IGAPORA III /PINDAI II C-1 BA RB FT LT 230 kV IGAPORA III /PINDAI II C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 467,758.67
  IGAPORA III IB 230 kV MG 500 kV IGAPORA III MG1 BA IB1 RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 289,120.02
  IGAPORA III IB 500 kV MG 500 kV IGAPORA III MG1 BA IB1 RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 964,418.51
  IGAPORA III IB 500 kV MG 500 kV IGAPORA III MG1 BA IB2 RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 964,418.51
  IGAPORA III IB 500 kV MG 500 kV IGAPORA III MG1 BA IB3 RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 964,418.51
  IGAPORA III IB 500 kV MG 500 kV IGAPORA III MG1 BA IB4 RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBNI REA 4493/2014 9/3/2018 9/3/2049 1,240,483.54
  IGAPORA III MC 230 kV TR 500/230 kV IGAPORA III TR1 BA RB FT TR 500/230 kV IGAPORA III TR1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 332,109.58
  IGAPORA III MC 230 kV TR 500/230 kV IGAPORA III TR2 BA RB FT TR 500/230 kV IGAPORA III TR2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 332,109.58
  IGAPORA III MC 230 kV TR 500/230 kV IGAPORA III TR4 BA RB FT TR 500/230 kV IGAPORA III TR4 BA 019/2012 IPCA RBNI REA 5211/2015 3/12/2019 3/12/2043 488,995.73
  IGAPORA III MC 500 kV RTB 500 kV 150 Mvar IGAPORA III RTB1 BA RB FT RTB 500 kV 150 Mvar IGAPORA III RTB1 BA 019/2012 IPCA RBNI REA 4493/2014 8/9/2018 8/9/2046 1,116,111.11
  IGAPORA III MC 500 kV TR 500/230 kV IGAPORA III TR1 BA RB FT TR 500/230 kV IGAPORA III TR1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 903,825.23
  IGAPORA III MC 500 kV TR 500/230 kV IGAPORA III TR2 BA RB FT TR 500/230 kV IGAPORA III TR2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 903,825.23
  IGAPORA III MC 500 kV TR 500/230 kV IGAPORA III TR3 BA RB FT TR 500/230 kV IGAPORA III TR3 BA 019/2012 IPCA RBNI REA 4493/2014 8/7/2018 8/7/2046 1,190,883.87
  IGAPORA III MC 500 kV TR 500/230 kV IGAPORA III TR3 BA RB FT TR 500/230 kV IGAPORA III TR3 BA 019/2012 IPCA RBNI REA 4493/2014 8/7/2018 8/7/2042 453,868.05
  IGAPORA III MC 500 kV TR 500/230 kV IGAPORA III TR4 BA RB FT TR 500/230 kV IGAPORA III TR4 BA 019/2012 IPCA RBNI REA 5211/2015 3/12/2019 3/12/2047 1,262,059.18
  IGAPORA III MG 500 kV IGAPORA III MG1 BA RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBNI REA 4493/2014 9/3/2018 9/3/2044 317,911.50
  IGAPORA III MG 500 kV IGAPORA III MG1 BA RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 2,233,522.89
  IGAPORA III MG 500 kV IGAPORA III MG1 BA RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBNI REA 5211/2015 3/12/2019 3/12/2051 51,151.79
  IGAPORA III MG 500 kV IGAPORA III MG1 BA RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBNI REA 7761/2019 30/04/2019 29/04/2034 2,913.79
  IGAPORA III RTB 500 kV 150 Mvar IGAPORA III RTB1 BA RB FT RTB 500 kV 150 Mvar IGAPORA III RTB1 BA 019/2012 IPCA RBNI REA 4493/2014 8/9/2018 8/9/2054 2,140,855.43
  IGAPORA III RTB 500 kV 50 Mvar IGAPORA III RTBR1 BA RB FT RTB 500 kV 50 Mvar IGAPORA III RTBR1 BA 019/2012 IPCA RBNI REA 4493/2014 8/9/2018 8/9/2054 713,618.47
  IGAPORA III TR 500/230 kV IGAPORA III TR1 BA RB FT TR 500/230 kV IGAPORA III TR1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 4,318,987.95
  IGAPORA III TR 500/230 kV IGAPORA III TR2 BA RB FT TR 500/230 kV IGAPORA III TR2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 4,318,987.95
  IGAPORA III TR 500/230 kV IGAPORA III TR3 BA RB FT TR 500/230 kV IGAPORA III TR3 BA 019/2012 IPCA RBNI REA 4493/2014 8/7/2018 8/7/2053 4,763,009.30
  IGAPORA III TR 500/230 kV IGAPORA III TR4 BA RB FT TR 500/230 kV IGAPORA III TR4 BA 019/2012 IPCA RBNI REA 5211/2015 3/12/2019 3/12/2054 5,839,042.48
  IGAPORA III TR 500/230 kV IGAPORA III TRR1 BA RB FT TR 500/230 kV IGAPORA III TRR1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 1,439,663.18
  IRECE CR 230 kV 81 MVAr IRECE BC1 BA RB FT CR 230 kV 81 MVAr IRECE BC1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,737.45
  IRECE CS 30/-15 MVAr IRECE CS1 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 752,929.14
  IRECE CS 30/-15 MVAr IRECE CS1 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 714,006.39
  IRECE CS 30/-15 MVAr IRECE CS1 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,310,663.95
  IRECE EL 138 kV IRECE  AGUAS BELAS DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54

 

61 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  IRECE EL 138 kV IRECE  AGUAS BELAS DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 149,707.89
  IRECE EL 138 kV IRECE  BAIXIOS 03N2 DIT   061/2001 IPCA RCDM REA 2376/2010 23/08/2015 22/08/2045 851,968.63
  IRECE EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2047 60,314.63
  IRECE EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  IRECE EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  IRECE EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  IRECE EL 230 kV IRECE LT 230 kV MORRO CHAPEU II /IRECE C-1 BA RB FT LT 230 kV MORRO CHAPEU II /IRECE C-1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041 401,617.04
  IRECE EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  IRECE EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  IRECE EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  IRECE EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RMEL REN 443/2011 22/04/2017 21/04/2047 60,310.23
  IRECE EL 69 kV IRECE  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  IRECE EL 69 kV IRECE  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  IRECE EL 69 kV IRECE  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  IRECE EL 69 kV IRECE  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  IRECE IB 138 kV MG 230 kV IRECE MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,407.76
  IRECE IB 230 kV MG 230 kV IRECE MG1 BA IB1 RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  IRECE IB 230 kV MG 230 kV IRECE MG1 BA IB1 RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  IRECE IB 230 kV MG 230 kV IRECE MG1 BA IB1 RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 374,783.88
  IRECE IB 69 kV MG 230 kV IRECE MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  IRECE IB 69 kV MG 230 kV IRECE MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  IRECE MC 13,8 kV CS 30/-15 MVAr IRECE CS1 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,419.78
  IRECE MC 13,8 kV CS 30/-15 MVAr IRECE CS1 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 52,554.84
  IRECE MC 13,8 kV CS 30/-15 MVAr IRECE CS1 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 170,077.73
  IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT1 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT1 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,473.00
  IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT1 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,285.27
  IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT2 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT2 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,473.00
  IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT2 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,285.27
  IRECE MC 13,8 kV TR 230/13,8 kV IRECE TR7 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  IRECE MC 13,8 kV TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  IRECE MC 13,8 kV TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 38,868.36
  IRECE MC 138 kV TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  IRECE MC 138 kV TR 230/138 kV IRECE TR5 BA RBF FT TR 230/138 kV IRECE TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  IRECE MC 138 kV TR 230/138 kV IRECE TR8 BA RBF FT TR 230/138 kV IRECE TR8 BA 061/2001 IPCA RBNI REA 3965/2013 19/12/2019 19/12/2041 447,992.32
  IRECE MC 230 kV RTL 230 kV 15 MVAr IRECE RT1 BA RB FT RTL 230 kV 15 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  IRECE MC 230 kV RTL 230 kV 15 MVAr IRECE RT1 BA RB FT RTL 230 kV 15 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 79,937.26
  IRECE MC 230 kV RTL 230 kV 15 MVAr IRECE RT1 BA RB FT RTL 230 kV 15 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 258,692.58
  IRECE MC 230 kV TR 230/13,8 kV IRECE TR7 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  IRECE MC 230 kV TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  IRECE MC 230 kV TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  IRECE MC 230 kV TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  IRECE MC 230 kV TR 230/138 kV IRECE TR5 BA RBF FT TR 230/138 kV IRECE TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  IRECE MC 230 kV TR 230/138 kV IRECE TR8 BA RBF FT TR 230/138 kV IRECE TR8 BA 061/2001 IPCA RBNI REA 3965/2013 19/12/2019 19/12/2043 622,185.34
  IRECE MC 230 kV TR 230/69 kV IRECE TR1 BA RBF FT TR 230/69 kV IRECE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  IRECE MC 230 kV TR 230/69 kV IRECE TR1 BA RBF FT TR 230/69 kV IRECE TR1 BA 061/2001 IPCA RMEL REN 443/2011 16/07/2017 15/07/2047 60,683.17
  IRECE MC 230 kV TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  IRECE MC 230 kV TR 230/69 kV IRECE TR3 BA RBF FT TR 230/69 kV IRECE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  IRECE MC 230 kV TR 230/69 kV IRECE TR6 BA RBF FT TR 230/69 kV IRECE TR6 BA 061/2001 IPCA RBNI REA 3965/2013 10/11/2019 10/11/2043 622,185.34
  IRECE MC 69 kV TR 230/69 kV IRECE TR1 BA RBF FT TR 230/69 kV IRECE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  IRECE MC 69 kV TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  IRECE MC 69 kV TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  IRECE MC 69 kV TR 230/69 kV IRECE TR3 BA RBF FT TR 230/69 kV IRECE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  IRECE MC 69 kV TR 230/69 kV IRECE TR6 BA RBF FT TR 230/69 kV IRECE TR6 BA 061/2001 IPCA RBNI REA 3965/2013 10/11/2019 10/11/2042 246,758.76
  IRECE MC 69 kV TT 69/13,8 kV IRECE TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 584,655.81
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 554,431.96
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,794,249.99
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBNI REA 3965/2013 19/12/2019 19/12/2053 101,285.90
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBNI REA 3965/2013 19/12/2019 19/12/2053 79,772.03
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RMEL REN 443/2011 7/12/2016 7/11/2046 3,038.85
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBNI REA 2376/2010 23/08/2015 22/08/2043 114,566.85
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RMEL REN 643/2014 2/10/2014 2/9/2031 23,647.86
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RMEL REN 643/2014 12/4/2015 12/3/2032 30,798.06
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RMEL REN 643/2014 31/10/2015 30/10/2043 65,749.98
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RMEL REN 643/2014 28/02/2015 27/02/2043 43,977.20
  IRECE RTB 13,8 kV 5 MVAr IRECE RT1 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  IRECE RTB 13,8 kV 5 MVAr IRECE RT1 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  IRECE RTB 13,8 kV 5 MVAr IRECE RT2 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  IRECE RTB 13,8 kV 5 MVAr IRECE RT2 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  IRECE RTL 230 kV 15 MVAr IRECE RT1 BA RB FT RTL 230 kV 15 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 217,318.67
  IRECE RTL 230 kV 15 MVAr IRECE RT1 BA RB FT RTL 230 kV 15 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 206,084.35
  IRECE RTL 230 kV 5 Mvar IRECE RTR1 BA RB FT RTL 230 kV 5 Mvar IRECE RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 72,439.56
  IRECE RTL 230 kV 5 Mvar IRECE RTR1 BA RB FT RTL 230 kV 5 Mvar IRECE RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 68,694.78
  IRECE RTS 13,8 kV 0 Mvar IRECE RLCC BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 113,225.78
  IRECE TR 230/13,8 kV IRECE TR7 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,494.87
  IRECE TR 230/13,8 kV IRECE TR7 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,388.74
  IRECE TR 230/13,8 kV IRECE TR7 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,954.14
  IRECE TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 251,877.35
  IRECE TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 238,856.53
  IRECE TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 772,986.32
  IRECE TR 230/138 kV IRECE TR5 BA RBF FT TR 230/138 kV IRECE TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 251,877.35
  IRECE TR 230/138 kV IRECE TR8 BA RBF FT TR 230/138 kV IRECE TR8 BA 061/2001 IPCA RBNI REA 3965/2013 19/12/2019 19/12/2054 1,302,794.58
  IRECE TR 230/138 kV IRECE TRR1 BA RBF FT TR 230/138 kV IRECE TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 264,743.51
  IRECE TR 230/138 kV IRECE TRR1 BA RBF FT TR 230/138 kV IRECE TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 251,057.56
  IRECE TR 230/138 kV IRECE TRR1 BA RBF FT TR 230/138 kV IRECE TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 812,471.25
  IRECE TR 230/69 kV IRECE TR1 BA RBF FT TR 230/69 kV IRECE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 191,938.38
  IRECE TR 230/69 kV IRECE TR1 BA RBF FT TR 230/69 kV IRECE TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 182,016.10
  IRECE TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,248.83
  IRECE TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RMEL REN 443/2011 20/08/2017 19/08/2051 24,890.74
  IRECE TR 230/69 kV IRECE TR3 BA RBF FT TR 230/69 kV IRECE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,248.83
  IRECE TR 230/69 kV IRECE TR6 BA RBF FT TR 230/69 kV IRECE TR6 BA 061/2001 IPCA RBNI REA 3965/2013 10/11/2019 10/11/2054 765,310.83
  IRECE TR 69/69 kV IRECE TREG2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,394.59
  IRECE TR 69/69 kV IRECE TREG3 BA RBF FT TR 230/69 kV IRECE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,394.59
  IRECE TT 69/13,8 kV IRECE TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2031 103,531.43
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2031 103,531.43
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RMEL REN 643/2014 21/04/2014 20/04/2044 17,525.49
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2031 103,531.43
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RMEL REN 443/2011 20/08/2017 19/08/2045 14,324.67
  ITABAIANA EL 69 kV ITABAIANA  DIST1 DIT   061/2001 IPCA RMEL REN 643/2014 2/9/2014 2/8/2044 21,422.03

 

62 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  ITABAIANA EL 69 kV ITABAIANA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ITABAIANA EL 69 kV ITABAIANA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ITABAIANA EL 69 kV ITABAIANA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ITABAIANA EL 69 kV ITABAIANA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ITABAIANA EL 69 kV ITABAIANA  DIST2 DIT   061/2001 IPCA RMEL REN 643/2014 22/01/2015 21/01/2045 11,005.39
  ITABAIANA EL 69 kV ITABAIANA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ITABAIANA EL 69 kV ITABAIANA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ITABAIANA EL 69 kV ITABAIANA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ITABAIANA EL 69 kV ITABAIANA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ITABAIANA EL 69 kV ITABAIANA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ITABAIANA EL 69 kV ITABAIANA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ITABAIANA EL 69 kV ITABAIANA  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ITABAIANA EL 69 kV ITABAIANA  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ITABAIANA EL 69 kV ITABAIANA  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ITABAIANA EL 69 kV ITABAIANA  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ITABAIANA EL 69 kV ITABAIANA  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ITABAIANA EL 69 kV ITABAIANA  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ITABAIANA EL 69 kV ITABAIANA  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ITABAIANA EL 69 kV ITABAIANA  DIST9 DIT   061/2001 IPCA RCDM REN 905/2020 18/09/2017 17/09/2044 416,977.73
  ITABAIANA IB 230 kV MG 230 kV ITABAIANA MG1 SE IB1 RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  ITABAIANA IB 69 kV MG 230 kV ITABAIANA MG1 SE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  ITABAIANA MC 230 kV TR 230/69 kV ITABAIANA TR1 SE RBF FT TR 230/69 kV ITABAIANA TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  ITABAIANA MC 230 kV TR 230/69 kV ITABAIANA TR2 SE RBF FT TR 230/69 kV ITABAIANA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  ITABAIANA MC 230 kV TR 230/69 kV ITABAIANA TR2 SE RBF FT TR 230/69 kV ITABAIANA TR2 SE 061/2001 IPCA RMEL REN 443/2011 24/11/2017 23/11/2049 107,769.21
  ITABAIANA MC 230 kV TR 230/69 kV ITABAIANA TR3 SE RBF FT TR 230/69 kV ITABAIANA TR3 SE 061/2001 IPCA RBNI REA 2823/2011 22/06/2020 22/06/2054 448,496.10
  ITABAIANA MC 69 kV TR 230/69 kV ITABAIANA TR1 SE RBF FT TR 230/69 kV ITABAIANA TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ITABAIANA MC 69 kV TR 230/69 kV ITABAIANA TR1 SE RBF FT TR 230/69 kV ITABAIANA TR1 SE 061/2001 IPCA RMEL REN 643/2014 12/7/2014 12/6/2044 32,899.11
  ITABAIANA MC 69 kV TR 230/69 kV ITABAIANA TR2 SE RBF FT TR 230/69 kV ITABAIANA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ITABAIANA MC 69 kV TR 230/69 kV ITABAIANA TR3 SE RBF FT TR 230/69 kV ITABAIANA TR3 SE 061/2001 IPCA RBNI REA 2823/2011 22/06/2020 22/06/2054 215,611.63
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBNI REA 2823/2011 22/06/2020 22/06/2054 1,011,992.47
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 536,304.67
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 508,580.34
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 443/2011 15/09/2016 14/09/2033 28,872.55
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 443/2011 1/11/2016 1/10/2046 2,713.45
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 443/2011 1/11/2016 1/10/2046 2,713.44
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 643/2014 30/04/2014 29/04/2042 72,198.09
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 643/2014 12/6/2015 12/5/2032 30,805.71
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 18,975.84
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBNI REN 905/2020 18/09/2017 17/09/2048 34,535.97
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBNI REA 1814/2009 21/08/2015 20/08/2043 52,214.43
  ITABAIANA TR 230/69 kV ITABAIANA TR1 SE RBF FT TR 230/69 kV ITABAIANA TR1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  ITABAIANA TR 230/69 kV ITABAIANA TR1 SE RBF FT TR 230/69 kV ITABAIANA TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  ITABAIANA TR 230/69 kV ITABAIANA TR2 SE RBF FT TR 230/69 kV ITABAIANA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  ITABAIANA TR 230/69 kV ITABAIANA TR2 SE RBF FT TR 230/69 kV ITABAIANA TR2 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  ITABAIANA TR 230/69 kV ITABAIANA TR3 SE RBF FT TR 230/69 kV ITABAIANA TR3 SE 061/2001 IPCA RBNI REA 2823/2011 22/06/2020 22/06/2060 1,235,426.03
  ITABAIANA TT 69/13,8 kV ITABAIANA TA1 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  ITABAIANA TT 69/13,8 kV ITABAIANA TA1 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  ITABAIANA TT 69/13,8 kV ITABAIANA TA1 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  ITABAIANA TT 69/13,8 kV ITABAIANA TA2 SE DIT   061/2001 IPCA RCDM REA 2837/2011 20/03/2016 19/03/2046 183,284.16
  ITABAIANINHA BC 230 kV 0 Mvar ITABAIANINHA BC1 SE RB FT BC 230 kV 50 Mvar ITABAIANINHA BC1 SE 061/2001 IPCA RBNI REA 5212/2015 12/3/2017 12/2/2040 377,375.79
  ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2031 103,531.43
  ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  ITABAIANINHA EL 69 kV ITABAIANINHA  ARAUA 04M2 DIT   061/2001 IPCA RCDM REA 2837/2011 3/6/2015 3/5/2045 437,727.40
  ITABAIANINHA EL 69 kV ITABAIANINHA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ITABAIANINHA EL 69 kV ITABAIANINHA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ITABAIANINHA EL 69 kV ITABAIANINHA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ITABAIANINHA EL 69 kV ITABAIANINHA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ITABAIANINHA EL 69 kV ITABAIANINHA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  ITABAIANINHA EL 69 kV ITABAIANINHA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  ITABAIANINHA EL 69 kV ITABAIANINHA  ITAB. 04M4 DIT   061/2001 IPCA RCDM REA 2376/2010 22/03/2015 21/03/2045 416,033.74
  ITABAIANINHA IB 230 kV MG 230 kV ITABAIANINHA MG1 SE IB1 RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBNI REA 5212/2015 12/3/2017 12/2/2050 94,078.65
  ITABAIANINHA IB 230 kV MG 230 kV ITABAIANINHA MG1 SE IB1 RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  ITABAIANINHA IB 69 kV MG 230 kV ITABAIANINHA MG1 SE IB1 DIT   061/2001 IPCA RCDM REA 2460/2010 11/2/2012 11/1/2043 258,692.70
  ITABAIANINHA MC 230 kV BC 230 kV 0 Mvar ITABAIANINHA BC1 SE RB FT BC 230 kV 50 Mvar ITABAIANINHA BC1 SE 061/2001 IPCA RBNI REA 5212/2015 12/3/2017 12/2/2047 1,117,318.11
  ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR1 SE RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR1 SE RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR1 SE RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR2 SE RBF FT TR 230/69 kV ITABAIANINHA TR2 SE 061/2001 IPCA RMEL REN 643/2014 3/8/2014 3/7/2044 18,434.74
  ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR2 SE RBF FT TR 230/69 kV ITABAIANINHA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR3 SE RBF FT TR 230/69 kV ITABAIANINHA TR3 SE 061/2001 IPCA RBNI REA 4271/2013 8/10/2015 8/9/2045 999,948.01
  ITABAIANINHA MC 69 kV TR 230/69 kV ITABAIANINHA TR1 SE RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ITABAIANINHA MC 69 kV TR 230/69 kV ITABAIANINHA TR1 SE RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  ITABAIANINHA MC 69 kV TR 230/69 kV ITABAIANINHA TR1 SE RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  ITABAIANINHA MC 69 kV TR 230/69 kV ITABAIANINHA TR2 SE RBF FT TR 230/69 kV ITABAIANINHA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ITABAIANINHA MC 69 kV TR 230/69 kV ITABAIANINHA TR3 SE RBF FT TR 230/69 kV ITABAIANINHA TR3 SE 061/2001 IPCA RBNI REA 4271/2013 8/10/2015 8/9/2045 390,749.19
  ITABAIANINHA MC 69 kV TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  ITABAIANINHA MC 69 kV TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  ITABAIANINHA MC 69 kV TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBNI REA 4271/2013 8/10/2015 8/9/2043 179,145.61
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBNI REA 2837/2011 3/6/2015 3/5/2043 50,974.42
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBNI REA 2376/2010 22/03/2015 21/03/2043 51,033.65
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBNI REA 5212/2015 12/3/2017 12/2/2045 189,739.70
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 23,222.36
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RMEL REN 643/2014 2/7/2014 2/6/2028 83,674.59
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RMEL REN 643/2014 12/5/2015 12/4/2032 27,885.82
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RMEL REN 643/2014 31/08/2015 30/08/2043 65,422.25
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 426,086.51
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 404,059.92
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,307,616.73
  ITABAIANINHA TR 230/69 kV ITABAIANINHA TR1 SE RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBNI REA 4423/2013 9/12/2016 9/11/2050 1,397,839.41
  ITABAIANINHA TR 230/69 kV ITABAIANINHA TR2 SE RBF FT TR 230/69 kV ITABAIANINHA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 191,938.38
  ITABAIANINHA TR 230/69 kV ITABAIANINHA TR3 SE RBF FT TR 230/69 kV ITABAIANINHA TR3 SE 061/2001 IPCA RBNI REA 4271/2013 8/10/2015 8/9/2049 1,281,853.23
  ITABAIANINHA TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  ITABAIANINHA TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  ITABAIANINHA TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  ITABAIANINHA TT 69/13,8 kV ITABAIANINHA TA1 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  ITABAIANINHA TT 69/13,8 kV ITABAIANINHA TA1 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  ITABAIANINHA TT 69/13,8 kV ITABAIANINHA TA1 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  ITAPEBI EL 230 kV ITAPEBI LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  ITAPEBI EL 230 kV ITAPEBI LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBNI REA 5861/2016 3/5/2014 3/4/2042 7,239.85
  ITAPEBI EL 230 kV ITAPEBI LT 230 kV FUNIL /ITAPEBI C-2 BA RB FT LT 230 kV FUNIL /ITAPEBI C-2 BA 061/2001 IPCA RBNI REA 5861/2016 6/9/2016 6/8/2044 8,843.15
  ITAPEBI EL 230 kV ITAPEBI LT 230 kV FUNIL /ITAPEBI C-2 BA RB FT LT 230 kV FUNIL /ITAPEBI C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  ITAPEBI EL 230 kV ITAPEBI LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  ITAPEBI EL 230 kV ITAPEBI LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  ITAPEBI EL 230 kV ITAPEBI LT 230 kV ITAPEBI /VERACEL C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 197,192.82
  ITAPEBI IB 230 kV MG 230 kV ITAPEBI MG1 BA IB1 RB FT MG 230 kV ITAPEBI MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21

 

63 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  ITAPEBI MG 230 kV ITAPEBI MG1 BA RB FT MG 230 kV ITAPEBI MG1 BA 061/2001 IPCA RMEL REN 443/2011 27/04/2016 26/04/2031 4,158.94
  ITAPEBI MG 230 kV ITAPEBI MG1 BA RB FT MG 230 kV ITAPEBI MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 399,781.38
  JABOATAO II EL 230 kV JABOATAO II LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RBNI REA 10092/2021 3/11/2021 3/11/2049 131,990.95
  JABOATAO II EL 230 kV JABOATAO II LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBNI REA 10092/2021 3/11/2021 3/11/2049 131,990.95
  JABOATAO II EL 69 kV JABOATAO II  DIST1 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 6/1/2042 151,266.68
  JABOATAO II EL 69 kV JABOATAO II  DIST2 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 6/1/2042 151,266.68
  JABOATAO II EL 69 kV JABOATAO II  DIST3 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 6/1/2042 151,266.68
  JABOATAO II EL 69 kV JABOATAO II  DIST4 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 6/1/2042 151,266.68
  JABOATAO II EL 69 kV JABOATAO II  DIST5 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 6/1/2042 151,266.68
  JABOATAO II IB 230 kV MG 230 kV JABOATAO II MG1 PE IB1 RB FT MG 230 kV JABOATAO II MG1 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 6/1/2042 372,437.87
  JABOATAO II IB 69 kV MG 230 kV JABOATAO II MG1 PE IB1 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 6/1/2042 88,215.44
  JABOATAO II MC 230 kV TR 230/69 kV JABOATAO II TR1 PE RBF FT TR 230/69 kV JABOATAO II TR1 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 6/1/2042 427,838.61
  JABOATAO II MC 230 kV TR 230/69 kV JABOATAO II TR2 PE RBF FT TR 230/69 kV JABOATAO II TR2 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 6/1/2042 427,838.61
  JABOATAO II MC 69 kV TR 230/69 kV JABOATAO II TR1 PE RBF FT TR 230/69 kV JABOATAO II TR1 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 6/1/2042 174,448.87
  JABOATAO II MC 69 kV TR 230/69 kV JABOATAO II TR2 PE RBF FT TR 230/69 kV JABOATAO II TR2 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 6/1/2042 174,448.87
  JABOATAO II MC 69 kV TT 69/0 kV JABOATAO II TT1 PE DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 6/1/2042 54,771.67
  JABOATAO II MG 230 kV JABOATAO II MG1 PE RB FT MG 230 kV JABOATAO II MG1 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 6/1/2042 927,228.74
  JABOATAO II TR 230/69 kV JABOATAO II TR1 PE RBF FT TR 230/69 kV JABOATAO II TR1 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 6/1/2042 1,332,544.45
  JABOATAO II TR 230/69 kV JABOATAO II TR2 PE RBF FT TR 230/69 kV JABOATAO II TR2 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 6/1/2042 1,332,544.45
  JABOATAO II TT 69/0 kV JABOATAO II TT1 PE DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 6/1/2042 52,669.46
  JACARACANGA BC 69 kV 27,1 Mvar JACARACANGA BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,634.31
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 9/1/2014 31/08/2040 78,981.46
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 8/11/2014 8/10/2040 78,833.93
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RMEL REN 643/2014 15/11/2013 14/11/2041 66,581.44
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RMEL REN 443/2011 19/12/2015 18/12/2045 12,355.77
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RMEL REN 443/2011 19/12/2015 18/12/2045 12,355.77
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RCDM REA 5861/2016 2/8/2015 2/7/2030 100,365.80
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 201,812.85
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 630,775.39
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 201,812.85
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 630,775.39
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RCDM REA 5861/2016 2/8/2015 2/7/2030 100,365.80
  JACARACANGA EL 69 kV JACARACANGA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JACARACANGA EL 69 kV JACARACANGA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  JACARACANGA EL 69 kV JACARACANGA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  JACARACANGA EL 69 kV JACARACANGA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JACARACANGA EL 69 kV JACARACANGA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  JACARACANGA EL 69 kV JACARACANGA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  JACARACANGA EL 69 kV JACARACANGA  DIST3 DIT   061/2001 IPCA RCDM REA 2040/2009 6/8/2014 6/7/2044 7,675.40
  JACARACANGA EL 69 kV JACARACANGA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JACARACANGA EL 69 kV JACARACANGA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  JACARACANGA EL 69 kV JACARACANGA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  JACARACANGA EL 69 kV JACARACANGA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JACARACANGA EL 69 kV JACARACANGA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  JACARACANGA EL 69 kV JACARACANGA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  JACARACANGA EL 69 kV JACARACANGA  DIST4 DIT   061/2001 IPCA RCDM REA 2040/2009 6/8/2014 6/7/2044 7,675.40
  JACARACANGA IB 230 kV MG 230 kV JACARACANGA MG1 BA IB1 RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  JACARACANGA IB 69 kV MG 230 kV JACARACANGA MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  JACARACANGA IB 69 kV MG 230 kV JACARACANGA MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  JACARACANGA IB 69 kV MG 230 kV JACARACANGA MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  JACARACANGA MC 230 kV TR 230/69 kV JACARACANGA TR1 BA RBF FT TR 230/69 kV JACARACANGA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  JACARACANGA MC 230 kV TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  JACARACANGA MC 230 kV TR 230/69 kV JACARACANGA TR3 BA RBF FT TR 230/69 kV JACARACANGA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  JACARACANGA MC 69 kV BC 69 kV 27,1 Mvar JACARACANGA BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  JACARACANGA MC 69 kV BC 69 kV 27,1 Mvar JACARACANGA BC2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  JACARACANGA MC 69 kV BC 69 kV 27,1 Mvar JACARACANGA BC2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  JACARACANGA MC 69 kV TR 230/69 kV JACARACANGA TR1 BA RBF FT TR 230/69 kV JACARACANGA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  JACARACANGA MC 69 kV TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  JACARACANGA MC 69 kV TR 230/69 kV JACARACANGA TR3 BA RBF FT TR 230/69 kV JACARACANGA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  JACARACANGA MC 69 kV TT 69/13,8 kV JACARACANGA TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  JACARACANGA MC 69 kV TT 69/13,8 kV JACARACANGA TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  JACARACANGA MG 230 kV JACARACANGA MG1 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 515,231.98
  JACARACANGA MG 230 kV JACARACANGA MG1 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 488,597.00
  JACARACANGA MG 230 kV JACARACANGA MG1 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,581,195.22
  JACARACANGA TR 230/69 kV JACARACANGA TR1 BA RBF FT TR 230/69 kV JACARACANGA TR1 BA 061/2001 IPCA RMEL REN 443/2011 22/04/2017 21/04/2051 8,232.94
  JACARACANGA TR 230/69 kV JACARACANGA TR1 BA RBF FT TR 230/69 kV JACARACANGA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  JACARACANGA TR 230/69 kV JACARACANGA TR1 BA RBF FT TR 230/69 kV JACARACANGA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  JACARACANGA TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RMEL REN 443/2011 26/04/2017 25/04/2051 24,705.21
  JACARACANGA TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  JACARACANGA TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  JACARACANGA TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  JACARACANGA TR 230/69 kV JACARACANGA TR3 BA RBF FT TR 230/69 kV JACARACANGA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  JACARACANGA TR 69/13,8 kV JACARACANGA TR7 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  JACARACANGA TR 69/13,8 kV JACARACANGA TR7 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  JACARACANGA TR 69/13,8 kV JACARACANGA TR7 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  JACARACANGA TT 69/13,8 kV JACARACANGA TA1 BA DIT   061/2001 IPCA RCDM REA 3578/2012 2/5/2017 2/4/2047 199,871.90
  JACARACANGA TT 69/13,8 kV JACARACANGA TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  JACARACANGA TT 69/13,8 kV JACARACANGA TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  JACARACANGA TT 69/13,8 kV JACARACANGA TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  JAGUARARI-SE EL 230 kV JAGUARARI-SE LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  JAGUARARI-SE EL 230 kV JAGUARARI-SE LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042 409,314.22
  JAGUARARI-SE EL 230 kV JAGUARARI-SE LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042 409,314.22
  JAGUARARI-SE EL 230 kV JAGUARARI-SE LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  JAGUARARI-SE IB 230 kV MG 230 kV JAGUARARI-SE MG1 BA IB1 RB FT MG 230 kV JAGUARARI-SE MG1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2043 788,670.55
  JAGUARARI-SE MC 230 kV  04T1 M CARAIBA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  JAGUARARI-SE MC 230 kV  04T2 M CARAIBA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  JAGUARARI-SE MG 230 kV JAGUARARI-SE MG1 BA RB FT MG 230 kV JAGUARARI-SE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 365,940.34
  JAGUARARI-SE MG 230 kV JAGUARARI-SE MG1 BA RB FT MG 230 kV JAGUARARI-SE MG1 BA 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 28,817.16
  JARDIM BC 69 kV 20,3 Mvar JARDIM BC1 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,472.99
  JARDIM BC 69 kV 20,3 Mvar JARDIM BC1 SE DIT   061/2001 IPCA RMEL REN 643/2014 25/10/2013 24/10/2033 86,764.42
  JARDIM BC 69 kV 20,3 Mvar JARDIM BC2 SE DIT   061/2001 IPCA RMEL REN 643/2014 11/6/2013 11/5/2033 86,887.90
  JARDIM BC 69 kV 20,3 Mvar JARDIM BC2 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,472.99
  JARDIM BC 69 kV 20,3 Mvar JARDIM BC3 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,472.99
  JARDIM BC 69 kV 20,3 Mvar JARDIM BC3 SE DIT   061/2001 IPCA RMEL REN 643/2014 11/1/2013 31/10/2033 86,836.45
  JARDIM EL 230 kV JARDIM  CIMESA DIT   061/2001 IPCA RMEL REN 443/2011 9/8/2013 9/7/2043 13,141.77
  JARDIM EL 230 kV JARDIM  CIMESA DIT   061/2001 IPCA RMEL REN 443/2011 9/8/2013 9/7/2043 13,141.77
  JARDIM EL 230 kV JARDIM  CIMESA DIT   061/2001 IPCA RMEL REN 443/2011 9/8/2013 9/7/2043 13,141.77
  JARDIM EL 230 kV JARDIM  CIMESA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2031 36,133.52
  JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RMEL REN 643/2014 19/01/2014 18/01/2044 55,093.62
  JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RMEL REN 643/2014 2/2/2014 2/1/2044 55,155.05
  JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2031 36,133.52
  JARDIM EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-1 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51

 

64 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  JARDIM EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-1 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 201,812.85
  JARDIM EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-1 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 630,775.39
  JARDIM EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-2 SE RB FT LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 354,654.21
  JARDIM EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RMEL REN 643/2014 3/3/2013 3/2/2043 14,563.58
  JARDIM EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RMEL REN 643/2014 13/04/2013 4/12/2043 14,613.18
  JARDIM EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  JARDIM EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  JARDIM EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,322,567.42
  JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,322,567.42
  JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RMEL REN 643/2014 11/3/2013 11/2/2043 29,719.86
  JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBNI REA 5861/2016 6/8/2016 6/7/2044 24,297.02
  JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBNI REA 5861/2016 6/8/2016 6/7/2031 92,507.40
  JARDIM EL 69 kV JARDIM  02X2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JARDIM EL 69 kV JARDIM  02X3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JARDIM EL 69 kV JARDIM  02X3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  JARDIM EL 69 kV JARDIM  02X3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  JARDIM EL 69 kV JARDIM  ARACAJU C-1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JARDIM EL 69 kV JARDIM  ARACAJU C-2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JARDIM EL 69 kV JARDIM  ATALAIA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JARDIM EL 69 kV JARDIM  ATALAIA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  JARDIM EL 69 kV JARDIM  ATALAIA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  JARDIM EL 69 kV JARDIM  ATALAIA C2 DIT   061/2001 IPCA RCDM REA 1814/2009 15/08/2012 14/08/2040 281,128.91
  JARDIM EL 69 kV JARDIM  ESTANCIA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JARDIM EL 69 kV JARDIM  GRAGERO C-1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JARDIM EL 69 kV JARDIM  GRAGERO C-2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JARDIM EL 69 kV JARDIM  M.URUBU DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JARDIM EL 69 kV JARDIM  RIACHUELO C-1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JARDIM EL 69 kV JARDIM  RIACHUELO C-2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JARDIM EL 69 kV JARDIM  S.CRISTOVAO DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JARDIM EL 69 kV JARDIM  TAICOCA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JARDIM EL 69 kV JARDIM  TAICOCA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  JARDIM EL 69 kV JARDIM  UPGN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JARDIM IB 230 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 23/03/2014 22/03/2044 65,370.98
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 27/04/2014 26/04/2044 65,551.92
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB2 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044 65,226.22
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB2 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 13/04/2014 4/12/2044 43,653.03
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB2 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB2 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB2 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  JARDIM IB 69 kV MG 500 kV JARDIM MG1 SE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  JARDIM MC 230 kV TR 230/69 kV JARDIM TR1 SE RBF FT TR 230/69 kV JARDIM TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  JARDIM MC 230 kV TR 230/69 kV JARDIM TR1 SE RBF FT TR 230/69 kV JARDIM TR1 SE 061/2001 IPCA RMEL REN 643/2014 3/9/2014 3/8/2044 55,308.60
  JARDIM MC 230 kV TR 230/69 kV JARDIM TR2 SE RBF FT TR 230/69 kV JARDIM TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  JARDIM MC 230 kV TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  JARDIM MC 230 kV TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  JARDIM MC 230 kV TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  JARDIM MC 230 kV TR 230/69 kV JARDIM TR4 SE RBF FT TR 230/69 kV JARDIM TR4 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  JARDIM MC 230 kV TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  JARDIM MC 230 kV TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  JARDIM MC 230 kV TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  JARDIM MC 230 kV TR 500/230 kV JARDIM TR7 SE RB FT TR 500/230 kV JARDIM TR7 SE 061/2001 IPCA RBNI REA 2181/2009 17/12/2012 16/12/2042 1,034,759.74
  JARDIM MC 230 kV TR 500/230 kV JARDIM TR8 SE RB FT TR 500/230 kV JARDIM TR8 SE 061/2001 IPCA RBNI REA 5225/2015 17/12/2017 16/12/2047 1,167,235.74
  JARDIM MC 500 kV RTL 500 kV 40 Mvar JARDIM RTR1 SE RB FT RTL 500 kV 40 Mvar JARDIM RTR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  JARDIM MC 500 kV TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RMEL REN 443/2011 20/11/2016 19/11/2039 13,891.85
  JARDIM MC 500 kV TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  JARDIM MC 500 kV TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,697.68
  JARDIM MC 500 kV TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,167,288.04
  JARDIM MC 500 kV TR 500/230 kV JARDIM TR7 SE RB FT TR 500/230 kV JARDIM TR7 SE 061/2001 IPCA RBNI REA 2181/2009 17/12/2012 16/12/2043 1,594,273.57
  JARDIM MC 500 kV TR 500/230 kV JARDIM TR8 SE RB FT TR 500/230 kV JARDIM TR8 SE 061/2001 IPCA RBNI REA 5225/2015 17/12/2017 16/12/2048 1,861,245.32
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC1 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC1 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC1 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC2 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC2 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC2 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC3 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC3 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC3 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  JARDIM MC 69 kV TR 230/69 kV JARDIM TR1 SE RBF FT TR 230/69 kV JARDIM TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  JARDIM MC 69 kV TR 230/69 kV JARDIM TR2 SE RBF FT TR 230/69 kV JARDIM TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  JARDIM MC 69 kV TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  JARDIM MC 69 kV TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  JARDIM MC 69 kV TR 230/69 kV JARDIM TR4 SE RBF FT TR 230/69 kV JARDIM TR4 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  JARDIM MC 69 kV TT 69/13,8 kV JARDIM TA1 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  JARDIM MC 69 kV TT 69/13,8 kV JARDIM TA2 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 443/2011 17/03/2016 16/03/2044 81,330.22
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 443/2011 29/12/2016 28/12/2044 66,430.91
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 2/7/2014 2/6/2028 211,167.90
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 12/3/2015 12/2/2032 27,288.40
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2043 28,269.66
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,187,209.13
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBNI REA 5225/2015 17/12/2017 16/12/2045 189,911.62
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,125,836.23
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,643,425.65
  JARDIM RTL 500 kV 40 Mvar JARDIM RTR1 SE RB FT RTL 500 kV 40 Mvar JARDIM RTR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,965.90
  JARDIM RTL 500 kV 40 Mvar JARDIM RTR1 SE RB FT RTL 500 kV 40 Mvar JARDIM RTR1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 208,594.73
  JARDIM RTL 500 kV 40 Mvar JARDIM RTR1 SE RB FT RTL 500 kV 40 Mvar JARDIM RTR1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 675,053.25
  JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 616,778.48
  JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 584,894.05
  JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,892,831.25
  JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RMEL REN 643/2014 11/6/2013 11/5/2048 36,961.24
  JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RMEL REN 443/2011 30/03/2014 29/03/2044 15,037.74
  JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RMEL REN 443/2011 30/03/2014 29/03/2044 15,037.74
  JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RMEL REN 443/2011 30/03/2014 29/03/2044 15,037.74
  JARDIM TR 230/69 kV JARDIM TR1 SE RBF FT TR 230/69 kV JARDIM TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  JARDIM TR 230/69 kV JARDIM TR1 SE RBF FT TR 230/69 kV JARDIM TR1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  JARDIM TR 230/69 kV JARDIM TR2 SE RBF FT TR 230/69 kV JARDIM TR2 SE 061/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2051 25,047.47
  JARDIM TR 230/69 kV JARDIM TR2 SE RBF FT TR 230/69 kV JARDIM TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  JARDIM TR 230/69 kV JARDIM TR2 SE RBF FT TR 230/69 kV JARDIM TR2 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  JARDIM TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  JARDIM TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  JARDIM TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  JARDIM TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RMEL REN 443/2011 18/06/2017 17/06/2051 81,892.93
  JARDIM TR 230/69 kV JARDIM TR4 SE RBF FT TR 230/69 kV JARDIM TR4 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00

 

65 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  JARDIM TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RMEL REN 643/2014 29/09/2013 28/09/2047 49,813.51
  JARDIM TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  JARDIM TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,624,997.02
  JARDIM TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,258,807.35
  JARDIM TR 500/230 kV JARDIM TR7 SE RB FT TR 500/230 kV JARDIM TR7 SE 061/2001 IPCA RMEL REN 643/2014 10/6/2013 10/5/2047 17,892.70
  JARDIM TR 500/230 kV JARDIM TR7 SE RB FT TR 500/230 kV JARDIM TR7 SE 061/2001 IPCA RBNI REA 2181/2009 17/12/2012 16/12/2047 4,506,143.27
  JARDIM TR 500/230 kV JARDIM TR8 SE RB FT TR 500/230 kV JARDIM TR8 SE 061/2001 IPCA RBNI REA 5225/2015 17/12/2017 16/12/2052 5,014,941.44
  JARDIM TR 500/230 kV JARDIM TRR1 SE RB FT TR 500/230 kV JARDIM TRR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 571,193.59
  JARDIM TR 500/230 kV JARDIM TRR1 SE RB FT TR 500/230 kV JARDIM TRR1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 541,665.67
  JARDIM TR 500/230 kV JARDIM TRR1 SE RB FT TR 500/230 kV JARDIM TRR1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,752,935.78
  JARDIM TR 69/13,8 kV JARDIM TR5 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  JARDIM TR 69/13,8 kV JARDIM TR5 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  JARDIM TR 69/13,8 kV JARDIM TR5 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  JARDIM TT 69/13,8 kV JARDIM TA1 SE DIT   061/2001 IPCA RCDM REA 3578/2012 31/01/2016 30/01/2046 195,088.56
  JARDIM TT 69/13,8 kV JARDIM TA2 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  JARDIM TT 69/13,8 kV JARDIM TA2 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  JARDIM TT 69/13,8 kV JARDIM TA2 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  JOAIRAM EL 230 kV JOAIRAM LT 230 kV BONGI /JOAIRAM C-1 PE RB FT LT 230 kV BONGI /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  JOAIRAM EL 230 kV JOAIRAM LT 230 kV BONGI /JOAIRAM C-2 PE RB FT LT 230 kV BONGI /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  JOAIRAM EL 230 kV JOAIRAM LT 230 kV BONGI /JOAIRAM C-3 PE RB FT LT 230 kV BONGI /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  JOAIRAM EL 230 kV JOAIRAM LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  JOAIRAM EL 230 kV JOAIRAM LT 230 kV RECIFE II /JOAIRAM C-2 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  JOAIRAM EL 230 kV JOAIRAM LT 230 kV RECIFE II /JOAIRAM C-3 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  JOAIRAM EL 69 kV JOAIRAM  JOBOTAO C1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JOAIRAM EL 69 kV JOAIRAM  JOBOTAO C2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JOAIRAM EL 69 kV JOAIRAM  TEJIPIO DIT   061/2001 IPCA RCDM REA 1814/2009 30/09/2012 29/09/2042 391,128.67
  JOAIRAM EL 69 kV JOAIRAM  VARZEA C1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JOAIRAM EL 69 kV JOAIRAM  VARZEA C2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JOAIRAM EL 69 kV JOAIRAM  VARZEA C2 DIT   061/2001 IPCA RMEL REN 443/2011 17/05/2015 16/05/2038 6,269.59
  JOAIRAM IB 230 kV MG 230 kV JOAIRAM MG1 PE IB1 RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  JOAIRAM IB 69 kV MG 230 kV JOAIRAM MG1 PE IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  JOAIRAM MC 230 kV TR 230/69 kV JOAIRAM TR1 PE RBF FT TR 230/69 kV JOAIRAM TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  JOAIRAM MC 230 kV TR 230/69 kV JOAIRAM TR2 PE RBF FT TR 230/69 kV JOAIRAM TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  JOAIRAM MC 230 kV TR 230/69 kV JOAIRAM TR3 PE RBF FT TR 230/69 kV JOAIRAM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  JOAIRAM MC 230 kV TR 230/69 kV JOAIRAM TR3 PE RBF FT TR 230/69 kV JOAIRAM TR3 PE 061/2001 IPCA RMEL REN 443/2011 18/10/2017 17/10/2047 10,139.38
  JOAIRAM MC 69 kV TR 230/69 kV JOAIRAM TR1 PE RBF FT TR 230/69 kV JOAIRAM TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  JOAIRAM MC 69 kV TR 230/69 kV JOAIRAM TR2 PE RBF FT TR 230/69 kV JOAIRAM TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  JOAIRAM MC 69 kV TR 230/69 kV JOAIRAM TR3 PE RBF FT TR 230/69 kV JOAIRAM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  JOAIRAM MC 69 kV TT 69/0 kV JOAIRAM TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  JOAIRAM MG 230 kV JOAIRAM MG1 PE RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 527,859.82
  JOAIRAM MG 230 kV JOAIRAM MG1 PE RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2046 2,118.58
  JOAIRAM MG 230 kV JOAIRAM MG1 PE RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RMEL REN 443/2011 4/4/2016 4/3/2044 1,173.69
  JOAIRAM MG 230 kV JOAIRAM MG1 PE RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 26,359.22
  JOAIRAM MG 230 kV JOAIRAM MG1 PE RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RBNI REA 1814/2009 30/09/2012 29/09/2040 41,204.52
  JOAIRAM TR 230/69 kV JOAIRAM TR1 PE RBF FT TR 230/69 kV JOAIRAM TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 381,167.35
  JOAIRAM TR 230/69 kV JOAIRAM TR2 PE RBF FT TR 230/69 kV JOAIRAM TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 381,167.35
  JOAIRAM TR 230/69 kV JOAIRAM TR3 PE RBF FT TR 230/69 kV JOAIRAM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 381,167.35
  JOAIRAM TT 69/0 kV JOAIRAM TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  JOAIRAM TT 69/0 kV JOAIRAM TA2 PE DIT   061/2001 IPCA RCDM REA 2837/2011 27/04/2014 26/04/2044 174,916.98
  JOAO CAMARA II BC 230 kV 50 Mvar JOAO CAMARA II BC5 RN RB FT BC 230 kV 50,5 Mvar JOAO CAMARA II BC5 RN 019/2010 IPCA RBNI REA 4445/2013 26/11/2017 26/11/2037 325,226.55
  JOAO CAMARA II BC 230 kV 50 Mvar JOAO CAMARA II BC6 RN RB FT BC 230 kV 50,5 Mvar JOAO CAMARA II BC6 RN 019/2010 IPCA RBNI REA 4445/2013 16/11/2017 16/11/2037 325,223.25
  JOAO CAMARA II BC 69 kV 21 Mvar JOAO CAMARA II BC1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 169,884.97
  JOAO CAMARA II BC 69 kV 21 Mvar JOAO CAMARA II BC2 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 169,884.97
  JOAO CAMARA II BC 69 kV 21 Mvar JOAO CAMARA II BC3 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 169,884.97
  JOAO CAMARA II BC 69 kV 21 Mvar JOAO CAMARA II BC4 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 169,884.97
  JOAO CAMARA II EL 230 kV JOAO CAMARA II  UNI. DOS VENTOS DIT   061/2001 IPCA RCDM REA 6675/2017 7/1/2018 28/02/2038 109,055.24
  JOAO CAMARA II EL 230 kV JOAO CAMARA II LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN RB FT LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN 019/2010 IPCA RBL CC 019/2010 22/09/2014 23/11/2040 308,329.24
  JOAO CAMARA II EL 69 kV JOAO CAMARA II  02P3 ICG   019/2010 IPCA RICGNI REN 443/2011 27/02/2014 26/02/2037 248,980.16
  JOAO CAMARA II EL 69 kV JOAO CAMARA II  02P4 ICG   019/2010 IPCA RICGNI REN 443/2011 27/02/2014 26/02/2037 248,980.16
  JOAO CAMARA II IB 230 kV MG 230 kV JOAO CAMARA II MG1 RN IB1 RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RBL CC 019/2010 22/09/2014 23/11/2040 165,677.44
  JOAO CAMARA II IB 69 kV MG 69 kV JOAO CAMARA II MG1 RN IB1 ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 67,194.98
  JOAO CAMARA II MC 230 kV BC 230 kV 50 Mvar JOAO CAMARA II BC5 RN RB FT BC 230 kV 50,5 Mvar JOAO CAMARA II BC5 RN 019/2010 IPCA RBNI REA 4445/2013 26/11/2017 26/11/2043 995,638.90
  JOAO CAMARA II MC 230 kV BC 230 kV 50 Mvar JOAO CAMARA II BC6 RN RB FT BC 230 kV 50,5 Mvar JOAO CAMARA II BC6 RN 019/2010 IPCA RBNI REA 4445/2013 16/11/2017 16/11/2043 995,631.23
  JOAO CAMARA II MC 230 kV TR 230/69 kV JOAO CAMARA II TR1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 242,202.62
  JOAO CAMARA II MC 230 kV TR 230/69 kV JOAO CAMARA II TR2 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 242,202.62
  JOAO CAMARA II MC 230 kV TR 230/69 kV JOAO CAMARA II TR3 RN ICG   019/2010 IPCA RICGNI REA 4445/2013 29/10/2017 29/10/2041 964,787.60
  JOAO CAMARA II MC 69 kV BC 69 kV 21 Mvar JOAO CAMARA II BC1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 119,662.62
  JOAO CAMARA II MC 69 kV BC 69 kV 21 Mvar JOAO CAMARA II BC2 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 119,662.62
  JOAO CAMARA II MC 69 kV BC 69 kV 21 Mvar JOAO CAMARA II BC3 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 119,662.62
  JOAO CAMARA II MC 69 kV BC 69 kV 21 Mvar JOAO CAMARA II BC4 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 119,662.62
  JOAO CAMARA II MC 69 kV TR 230/69 kV JOAO CAMARA II TR1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 98,543.53
  JOAO CAMARA II MC 69 kV TR 230/69 kV JOAO CAMARA II TR2 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 98,543.53
  JOAO CAMARA II MC 69 kV TR 230/69 kV JOAO CAMARA II TR3 RN ICG   019/2010 IPCA RICGNI REA 4445/2013 29/10/2017 29/10/2040 356,068.38
  JOAO CAMARA II MC 69 kV TT 69/0 kV JOAO CAMARA II TT1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 42,029.51
  JOAO CAMARA II MG 230 kV JOAO CAMARA II MG1 RN RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RBNI REA 4445/2013 15/05/2020 15/05/2052 340,381.60
  JOAO CAMARA II MG 230 kV JOAO CAMARA II MG1 RN RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RBNI REN 443/2011 27/02/2014 26/02/2045 26,638.63
  JOAO CAMARA II MG 230 kV JOAO CAMARA II MG1 RN RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RMEL REN 643/2014 31/03/2015 30/03/2030 35,023.95
  JOAO CAMARA II MG 230 kV JOAO CAMARA II MG1 RN RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RBL CC 019/2010 22/09/2014 23/11/2040 460,641.87
  JOAO CAMARA II MG 69 kV JOAO CAMARA II MG1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 272,088.07
  JOAO CAMARA II MG 69 kV JOAO CAMARA II MG1 RN ICG   019/2010 IPCA RICGNI REN 443/2011 31/03/2015 30/03/2030 32,025.89
  JOAO CAMARA II MG 69 kV JOAO CAMARA II MG1 RN ICG   019/2010 IPCA RICGNI REA 4445/2013 29/10/2017 29/10/2046 32,640.18
  JOAO CAMARA II TR 230/69 kV JOAO CAMARA II TR1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 504,563.97
  JOAO CAMARA II TR 230/69 kV JOAO CAMARA II TR2 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 504,563.97
  JOAO CAMARA II TR 230/69 kV JOAO CAMARA II TR3 RN ICG   019/2010 IPCA RICGNI REA 4445/2013 29/10/2017 29/10/2052 1,648,828.20
  JOAO CAMARA II TT 69/0 kV JOAO CAMARA II TT1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 54,340.74
  JOAO CAMARA III BC 138 kV 50 Mvar JOAO CAMARA III BC1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 243,585.99
  JOAO CAMARA III EL 500 kV JOAO CAMARA III LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN RB FT LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 493,197.94
  JOAO CAMARA III IB 138 kV MG 138 kV JOAO CAMARA III MG1 RN IB1 ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 118,274.10
  JOAO CAMARA III IB 138 kV MG 138 kV JOAO CAMARA III MG1 RN IB2 ICG   008/2011 IPCA RICGNI REA 4443/2013 14/05/2016 13/08/2031 205,919.53
  JOAO CAMARA III IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB1 RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 470,427.77
  JOAO CAMARA III IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB2 RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 470,427.77
  JOAO CAMARA III IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB3 RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 14/03/2047 1,082,957.37
  JOAO CAMARA III IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB4 RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 14/03/2047 1,082,957.37
  JOAO CAMARA III MC 138 kV BC 138 kV 50 Mvar JOAO CAMARA III BC1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 162,344.78
  JOAO CAMARA III MC 138 kV TR 500/138 kV JOAO CAMARA III ATR3 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 14/03/2038 354,358.50
  JOAO CAMARA III MC 138 kV TR 500/138 kV JOAO CAMARA III ATR4 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 14/03/2038 354,358.50
  JOAO CAMARA III MC 138 kV TR 500/138 kV JOAO CAMARA III TR1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 157,657.37
  JOAO CAMARA III MC 138 kV TR 500/138 kV JOAO CAMARA III TR2 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 157,657.37
  JOAO CAMARA III MC 500 kV RTB 500 kV 0 Mvar JOAO CAMARA III RTB1 RN RB FT RTB 500 kV 0 Mvar JOAO CAMARA III RTB1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 14/03/2044 982,356.18
  JOAO CAMARA III MC 500 kV TR 500/138 kV JOAO CAMARA III ATR3 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 14/03/2045 1,221,883.20
  JOAO CAMARA III MC 500 kV TR 500/138 kV JOAO CAMARA III ATR4 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 14/03/2045 1,221,883.20
  JOAO CAMARA III MC 500 kV TR 500/138 kV JOAO CAMARA III TR1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 567,247.25
  JOAO CAMARA III MC 500 kV TR 500/138 kV JOAO CAMARA III TR2 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 567,247.25
  JOAO CAMARA III MG 138 kV JOAO CAMARA III MG1 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 14/03/2047 29,948.57
  JOAO CAMARA III MG 138 kV JOAO CAMARA III MG1 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 14/03/2047 29,948.57
  JOAO CAMARA III MG 138 kV JOAO CAMARA III MG1 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/05/2016 13/08/2031 29,948.57
  JOAO CAMARA III MG 138 kV JOAO CAMARA III MG1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 51,150.58
  JOAO CAMARA III MG 500 kV JOAO CAMARA III MG1 RN RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 550,400.11
  JOAO CAMARA III MG 500 kV JOAO CAMARA III MG1 RN RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 14/03/2046 230,232.62
  JOAO CAMARA III MG 500 kV JOAO CAMARA III MG1 RN RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 14/03/2046 230,232.62

 

66 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  JOAO CAMARA III RTB 500 kV 0 Mvar JOAO CAMARA III RTB1 RN RB FT RTB 500 kV 0 Mvar JOAO CAMARA III RTB1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 14/03/2052 1,857,097.14
  JOAO CAMARA III RTB 500 kV 0 Mvar JOAO CAMARA III RTBR1 RN RB FT RTB 500 kV 150 Mvar JOAO CAMARA III RTBR1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 14/03/2052 619,032.38
  JOAO CAMARA III TR 500/138 kV JOAO CAMARA III ATR3 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 14/03/2051 4,003,598.63
  JOAO CAMARA III TR 500/138 kV JOAO CAMARA III ATR4 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 14/03/2051 4,003,598.63
  JOAO CAMARA III TR 500/138 kV JOAO CAMARA III TR1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 2,220,008.01
  JOAO CAMARA III TR 500/138 kV JOAO CAMARA III TR2 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 2,220,008.01
  JOAO CAMARA III TR 500/138 kV JOAO CAMARA III TRR1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 740,002.33
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2038 99,360.92
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 6/9/2016 6/8/2044 24,884.84
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 6/9/2016 6/8/2031 103,520.74
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 19/09/2017 18/09/2032 104,589.23
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 9/10/2015 9/9/2030 25,518.46
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBNI REA 5861/2016 9/10/2015 9/9/2043 30,870.95
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBNI REA 5861/2016 19/09/2017 18/09/2032 104,589.23
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  JUAZEIRO II EL 69 kV JUAZEIRO II  02M1 DIT   061/2001 IPCA RCDM REA 2376/2010 13/12/2017 12/12/2047 443,531.35
  JUAZEIRO II EL 69 kV JUAZEIRO II  02M2 DIT   061/2001 IPCA RCDM REA 2376/2010 13/12/2017 12/12/2047 443,531.35
  JUAZEIRO II EL 69 kV JUAZEIRO II  CARAIBA 02C1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JUAZEIRO II EL 69 kV JUAZEIRO II  JUAZEIRO I 02C2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JUAZEIRO II EL 69 kV JUAZEIRO II  JUAZEIRO I 02C3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JUAZEIRO II EL 69 kV JUAZEIRO II  JUNCO 02C7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JUAZEIRO II EL 69 kV JUAZEIRO II  JUNCO 02C7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  JUAZEIRO II EL 69 kV JUAZEIRO II  JUNCO 02C7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  JUAZEIRO II EL 69 kV JUAZEIRO II  JUNCO 02C7 DIT   061/2001 IPCA RCDM REA 1814/2009 21/12/2014 20/12/2044 13,271.53
  JUAZEIRO II EL 69 kV JUAZEIRO II  PETROLINA 02C4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JUAZEIRO II EL 69 kV JUAZEIRO II  PETROLINA 02C5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JUAZEIRO II EL 69 kV JUAZEIRO II  SALITRE 02C8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JUAZEIRO II EL 69 kV JUAZEIRO II  TOURAO 02C6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  JUAZEIRO II IB 230 kV MG 230 kV JUAZEIRO II MG1 BA IB1 RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  JUAZEIRO II IB 69 kV MG 230 kV JUAZEIRO II MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  JUAZEIRO II MC 13,8 kV TR 13,8/0,22 kV JUAZEIRO II TR4 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  JUAZEIRO II MC 13,8 kV TR 13,8/0,22 kV JUAZEIRO II TR5 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR1 BA RBF FT TR 230/69 kV JUAZEIRO II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR3 BA RBF FT TR 230/69 kV JUAZEIRO II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR4 BA RBF FT TR 230/69 kV JUAZEIRO II TR4 BA 061/2001 IPCA RBNI REA 2823/2011 28/09/2015 27/09/2045 1,185,118.09
  JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR1 BA RBF FT TR 230/69 kV JUAZEIRO II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR3 BA RBF FT TR 230/69 kV JUAZEIRO II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR4 BA RBF FT TR 230/69 kV JUAZEIRO II TR4 BA 061/2001 IPCA RBNI REA 2823/2011 28/09/2015 27/09/2045 417,499.02
  JUAZEIRO II MC 69 kV TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  JUAZEIRO II MC 69 kV TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  JUAZEIRO II MC 69 kV TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBNI REA 2823/2011 28/09/2015 27/09/2045 1,411,481.27
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 515,482.17
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 488,834.27
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,581,963.04
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBNI REA 2376/2010 13/12/2017 12/12/2045 54,726.57
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBNI REA 2376/2010 13/12/2017 12/12/2045 54,726.57
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RMEL REN 443/2011 8/11/2016 8/10/2033 28,751.36
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/12/2013 29/12/2041 71,548.02
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RMEL REN 643/2014 27/11/2015 26/11/2032 27,858.13
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR1 BA RBF FT TR 230/69 kV JUAZEIRO II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR1 BA RBF FT TR 230/69 kV JUAZEIRO II TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR1 BA RBF FT TR 230/69 kV JUAZEIRO II TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR3 BA RBF FT TR 230/69 kV JUAZEIRO II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR3 BA RBF FT TR 230/69 kV JUAZEIRO II TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR3 BA RBF FT TR 230/69 kV JUAZEIRO II TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR4 BA RBF FT TR 230/69 kV JUAZEIRO II TR4 BA 061/2001 IPCA RBNI REA 2823/2011 28/09/2015 27/09/2049 1,309,109.04
  JUAZEIRO II TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  JUAZEIRO II TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  JUAZEIRO II TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  JUAZEIRO II TT 69/0 kV JUAZEIRO II TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  JUAZEIRO II TT 69/13,8 kV JUAZEIRO II TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  JUAZEIRO III EL 500 kV JUAZEIRO III LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBNI REA 9689/2021 31/07/2019 30/07/2047 164,694.41
  JUAZEIRO III EL 500 kV JUAZEIRO III LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBNI REA 9689/2021 31/07/2019 30/07/2047 164,694.41
  LAGOA DO CARRO EL 230 kV LAGOA DO CARRO LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE 061/2001 IPCA RBNI REA 9687/2021 22/10/2020 21/10/2048 131,990.95
  LAGOA DO CARRO EL 230 kV LAGOA DO CARRO LT 230 kV LAGOA DO CARRO /PAU FERRO C-2 PE RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-2 PE 061/2001 IPCA RBNI REA 9687/2021 22/10/2020 21/10/2048 131,990.95
  LAGOA NOVA II EL 230 kV LAGOA NOVA II LT 230 kV PARAISO /LAGOA NOVA II C-1 RN RB FT LT 230 kV PARAISO /LAGOA NOVA II C-2 RN 010/2011 IPCA RBL CC 010/2011 13/10/2011 13/10/2041 442,091.56
  LAGOA NOVA II IB 230 kV MG 230 kV LAGOA NOVA II MG1 RN IB1 RB FT MG 230 kV LAGOA NOVA II MG1 RN 010/2011 IPCA RBL CC 010/2011 13/10/2011 13/10/2041 238,626.26
  LAGOA NOVA II IB 69 kV MG 69 kV LAGOA NOVA II MG1 RN IB1 ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 88,175.92
  LAGOA NOVA II MC 230 kV TR 230/69 kV LAGOA NOVA II TR1 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 316,204.02
  LAGOA NOVA II MC 230 kV TR 230/69 kV LAGOA NOVA II TR2 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 316,204.02
  LAGOA NOVA II MC 230 kV TR 230/69 kV LAGOA NOVA II TR3 RN ICG   010/2011 IPCA RICGNI REA 4876/2014 28/11/2016 13/08/2031 519,078.69
  LAGOA NOVA II MC 69 kV TR 230/69 kV LAGOA NOVA II TR1 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 128,615.78
  LAGOA NOVA II MC 69 kV TR 230/69 kV LAGOA NOVA II TR2 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 128,615.78
  LAGOA NOVA II MC 69 kV TR 230/69 kV LAGOA NOVA II TR3 RN ICG   010/2011 IPCA RICGNI REA 4876/2014 28/11/2016 13/08/2031 192,214.47
  LAGOA NOVA II MC 69 kV TT 69/0 kV LAGOA NOVA II TA1 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 54,281.28
  LAGOA NOVA II MG 230 kV LAGOA NOVA II MG1 RN RB FT MG 230 kV LAGOA NOVA II MG1 RN 010/2011 IPCA RBL CC 010/2011 13/10/2011 13/10/2041 673,883.00
  LAGOA NOVA II MG 230 kV LAGOA NOVA II MG1 RN RB FT MG 230 kV LAGOA NOVA II MG1 RN 010/2011 IPCA RBNI REA 4876/2014 28/11/2016 28/11/2048 45,501.76
  LAGOA NOVA II MG 69 kV LAGOA NOVA II MG1 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 55,739.58
  LAGOA NOVA II MG 69 kV LAGOA NOVA II MG1 RN ICG   010/2011 IPCA RICGNI REA 4876/2014 28/11/2016 13/08/2031 14,404.84
  LAGOA NOVA II TR 230/69 kV LAGOA NOVA II TR1 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 867,640.42
  LAGOA NOVA II TR 230/69 kV LAGOA NOVA II TR2 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 867,640.42
  LAGOA NOVA II TR 230/69 kV LAGOA NOVA II TR3 RN ICG   010/2011 IPCA RICGNI REA 4876/2014 28/11/2016 13/08/2031 1,387,637.76
  LAGOA NOVA II TT 69/0 kV LAGOA NOVA II TA1 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 145,813.16
  LT  500 kV P. AFONSO IV /US. L.GONZAGA BA/PE LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,450,045.71
  LT  500 kV P. AFONSO IV /US. L.GONZAGA BA/PE LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,529,092.30
  LT  500 kV P. AFONSO IV /US. L.GONZAGA BA/PE LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBNI REA 5745/2016 1/10/2020 1/10/2049 1,202,210.14
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 31,047.92
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,383.41
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 31,047.92
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,383.41
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,383.41
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 31,047.92
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 31,047.92
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,383.41
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,383.41
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 31,047.92
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 97,041.72
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 97,041.72
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 31,047.92

 

67 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,383.41
  LT  500 kV US. L.GONZAGA/U.SOBRADINHO  PE/BA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,919,603.43
  LT  500 kV US. L.GONZAGA/U.SOBRADINHO  PE/BA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 39,648,965.97
  LT  500 kV US. L.GONZAGA/U.SOBRADINHO  PE/BA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 12,251,723.09
  LT 138 kV ACU II /SAN.MATOS II RN LT 138 kV ACU II /SAN.MATOS II C-1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 563,059.15
  LT 138 kV C.GRANDE II /PILOES PB LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 526,332.85
  LT 138 kV C.GRANDE II /PILOES PB LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RCDM REA 1094/2007 11/9/2012 11/8/2052 1,735,824.63
  LT 138 kV C.GRANDE II /SANTA CRUZ II PB/RN LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,052,665.71
  LT 138 kV PARAISO /SANTA CRUZ II RN LT 138 kV PARAISO /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,288.55
  LT 138 kV PARAISO /SANTA CRUZ II RN LT 138 kV PARAISO /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RCDM REA 1094/2007 30/03/2014 29/03/2054 52,809.69
  LT 138 kV PARAISO /SANTA CRUZ II RN LT 138 kV PARAISO /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RCDM REA 2173/2009 30/03/2014 29/03/2052 254,424.94
  LT 138 kV PILOES /PARAISO PB/RN LT 138 kV PILOES /PARAISO C-1 PB/RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 502,044.31
  LT 138 kV PILOES /PARAISO PB/RN LT 138 kV PILOES /PARAISO C-1 PB/RN DIT   061/2001 IPCA RCDM REA 2173/2009 30/03/2014 29/03/2052 256,926.17
  LT 138 kV PILOES /PARAISO PB/RN LT 138 kV PILOES /PARAISO C-1 PB/RN DIT   061/2001 IPCA RCDM REA 1094/2007 30/03/2014 29/03/2054 1,778,179.95
  LT 138 kV USINA PA-II /ZEBU BA LT 138 kV USINA PA-II /ZEBU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 81,734.39
  LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBNI REA 4407/2013 2/5/2020 2/5/2057 394,550.07
  LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 174,719.88
  LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 565,427.62
  LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,244.42
  LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,043,088.59
  LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 989,166.01
  LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 984,151.23
  LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,037,800.44
  LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,324,884.85
  LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,065,938.61
  LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,256,394.78
  LT 230 kV ANGELIM /RECIFE II PE LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,269,940.57
  LT 230 kV ANGELIM /RIBEIRAO PE LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBNI REA 3817/2013 20/08/2019 20/08/2056 23,880.50
  LT 230 kV ANGELIM /RIBEIRAO PE LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBNI REA 2823/2011 21/01/2015 20/01/2051 4,991,284.52
  LT 230 kV ANGELIM /RIBEIRAO PE LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,937,916.27
  LT 230 kV ANGELIM /RIBEIRAO PE LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,520,344.59
  LT 230 kV ANGELIM /TACAIMBO PE LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,070,292.57
  LT 230 kV ANGELIM /TACAIMBO PE LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,073,642.47
  LT 230 kV ANGELIM /TACAIMBO PE LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,100,441.65
  LT 230 kV ANGELIM /TACAIMBO PE LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,043,554.20
  LT 230 kV ANGELIM /TACAIMBO PE LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,377,144.96
  LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-143 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-143 CE 061/2001 IPCA RBNIA REA 3631/2012     965,231.37
  LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-143 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-143 CE 061/2001 IPCA RBNIA REA 3631/2012     268,146.55
  LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 176,966.99
  LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBNI REA 2823/2011 10/2/2020 10/2/2060 1,543,270.12
  LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 167,818.66
  LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 162,059.66
  LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,894.05
  LT 230 kV ARAPIRACA III /PENEDO AL LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2044 404,341.96
  LT 230 kV ARAPIRACA III /PENEDO AL LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,809,410.52
  LT 230 kV ARAPIRACA III /PENEDO AL LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 559,116.64
  LT 230 kV ARAPIRACA III /PENEDO AL LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 589,595.86
  LT 230 kV B. ESPERANCA /TERESINA PI LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,316,399.50
  LT 230 kV B. ESPERANCA /TERESINA PI LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,316,399.50
  LT 230 kV B. ESPERANCA /TERESINA PI LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,144,957.86
  LT 230 kV B. ESPERANCA /TERESINA PI LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 10,177,697.15
  LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho BA LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA RB FT LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA 061/2001 IPCA RBNI REA 10198/2021 19/06/2019 18/06/2047 1,041.13
  LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho BA LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA RB FT LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,052,850.30
  LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho BA LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA RB FT LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,299,991.48
  LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho BA LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA RB FT LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,946,727.97
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,038,686.00
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE 061/2001 IPCA RBNI REA 2823/2011 10/2/2020 10/2/2060 1,543,270.12
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,149,821.25
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,800,515.13
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,155,894.19
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,044,445.00
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBNI REA 3631/2012 11/6/2020 11/6/2057 965,231.37
  LT 230 kV BANABUIU /FORTALEZA CE LT 230 kV BANABUIU /FORTALEZA C-1 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-1 CE 061/2001 IPCA RMEL REN 643/2014 19/04/2014 18/04/2051 25,349.44
  LT 230 kV BANABUIU /FORTALEZA CE LT 230 kV BANABUIU /FORTALEZA C-3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 207,311.30
  LT 230 kV BANABUIU /FORTALEZA CE LT 230 kV BANABUIU /FORTALEZA C-3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,326,788.24
  LT 230 kV BANABUIU /FORTALEZA CE LT 230 kV BANABUIU /FORTALEZA C-3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,206,504.66
  LT 230 kV BANABUIU /ICO CE LT 230 kV BANABUIU /ICO C-1 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBNI REA 1312/2008 13/11/2012 11/12/2051 205,610.71
  LT 230 kV BANABUIU /ICO CE LT 230 kV BANABUIU /ICO C-1 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,487,954.64
  LT 230 kV BANABUIU /ICO CE LT 230 kV BANABUIU /ICO C-1 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,411,034.66
  LT 230 kV BANABUIU /MOSSORO II CE/RN LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 11,349,211.47
  LT 230 kV BANABUIU /MOSSORO II CE/RN LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,506,961.48
  LT 230 kV BANABUIU /MOSSORO II CE/RN LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,698,137.08
  LT 230 kV BANABUIU /MOSSORO II CE/RN LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN 061/2001 IPCA RBNI REA 2173/2009 6/6/2016 6/5/2053 4,841,311.68
  LT 230 kV BANABUIU /RUSSAS II CE LT 230 kV BANABUIU /RUSSAS II C-1 CE RB FT LT 230 kV BANABUIU /RUSSAS II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,849,143.96
  LT 230 kV BANABUIU /RUSSAS II CE LT 230 kV BANABUIU /RUSSAS II C-1 CE RB FT LT 230 kV BANABUIU /RUSSAS II C-1 CE 061/2001 IPCA RBNI REA 2173/2009 9/10/2019 9/10/2059 2,884,097.74
  LT 230 kV BARREIRAS II /BARREIRAS BA LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBNI REA 9680/2021 19/11/2019 18/11/2047 46,285.99
  LT 230 kV BARREIRAS II /BARREIRAS BA LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 234,492.89
  LT 230 kV BARREIRAS II /BARREIRAS BA LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 719,635.15
  LT 230 kV BARREIRAS II /BARREIRAS BA LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 222,370.76
  LT 230 kV BOM NOME /MILAGRES PE/CE LT 230 kV BOM NOME /MILAGRES C-1 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,401,932.52
  LT 230 kV BOM NOME /MILAGRES PE/CE LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,408,632.31
  LT 230 kV BOM NOME /MILAGRES PE/CE LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,405,282.41
  LT 230 kV BOM NOME /MILAGRES PE/CE LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,332,636.18
  LT 230 kV BONGI /ACONORTE PE LT 230 kV BONGI /ACONORTE C-1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 117,411.33
  LT 230 kV BONGI /ACONORTE PE LT 230 kV BONGI /ACONORTE C-1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 118,680.00
  LT 230 kV BONGI /JOAIRAM PE LT 230 kV BONGI /JOAIRAM C-1 PE RB FT LT 230 kV BONGI /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 126,626.16
  LT 230 kV BONGI /JOAIRAM PE LT 230 kV BONGI /JOAIRAM C-2 PE RB FT LT 230 kV BONGI /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 101,532.58
  LT 230 kV BONGI /JOAIRAM PE LT 230 kV BONGI /JOAIRAM C-3 PE RB FT LT 230 kV BONGI /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 101,532.58
  LT 230 kV BROT.MACAUBAS /B.JESUS LAPA BA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 4,779,563.88
  LT 230 kV BROT.MACAUBAS /B.JESUS LAPA BA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 15,467,601.12
  LT 230 kV BROT.MACAUBAS /B.JESUS LAPA BA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,040,113.09
  LT 230 kV BROT.MACAUBAS /B.JESUS LAPA BA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042 640,344.19
  LT 230 kV BRUMADO II /IBICOARA BA LT 230 kV BRUMADO II /IBICOARA C-1 BA RB FT LT 230 kV BRUMADO II /IBICOARA C-1 BA 010/2007 IPCA RBL CC 010/2007 6/11/2007 6/11/2037 3,584,017.14
  LT 230 kV C.GRANDE II /COTEMINAS PB LT 230 kV C.GRANDE II /COTEMINAS C-1 PB RB FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 32,435.45
  LT 230 kV C.GRANDE II /COTEMINAS PB LT 230 kV C.GRANDE II /COTEMINAS C-1 PB RB FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 30,758.70
  LT 230 kV C.GRANDE II /COTEMINAS PB LT 230 kV C.GRANDE II /COTEMINAS C-1 PB RB FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 99,541.15
  LT 230 kV C.GRANDE II /PARAISO PB/RN LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,561,327.79
  LT 230 kV C.GRANDE II /PARAISO PB/RN LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,480,614.78
  LT 230 kV C.GRANDE II /PARAISO PB/RN LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,491,898.04
  LT 230 kV C.GRANDE II /PARAISO PB/RN LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,573,226.14
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 201,324.27
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2050 56,942.59
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 101,019.08
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 31,215.39
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 32,917.04
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,718.13
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 202,968.12
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,137.10
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2050 56,942.59
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,255,426.60

 

68 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,138,832.07
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,921,677.81
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBNI REA 10141/2021 15/08/2016 15/08/2048 155,400.80
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2050 56,942.59
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2050 56,942.59
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,242,354.35
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,178,130.70
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,812,660.79
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBNI REA 3208/2011 1/6/2020 1/6/2060 1,219,779.93
  LT 230 kV CAMACARI II /BRAS.C.SODA BA LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 142,416.00
  LT 230 kV CAMACARI II /BRAS.C.SODA BA LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 440,369.44
  LT 230 kV CAMACARI II /BRAS.C.SODA BA LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 140,893.59
  LT 230 kV CAMACARI II /BRASKEM BA LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 118,680.00
  LT 230 kV CAMACARI II /BRASKEM BA LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 117,411.33
  LT 230 kV CAMACARI II /BRASKEM BA LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 366,974.53
  LT 230 kV CAMACARI II /BRASKEM BA LT 230 kV CAMACARI II /BRASKEM C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 117,411.33
  LT 230 kV CAMACARI II /BRASKEM BA LT 230 kV CAMACARI II /BRASKEM C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 118,680.00
  LT 230 kV CAMACARI II /CARAIBAS BA LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 67,837.66
  LT 230 kV CAMACARI II /CARAIBAS BA LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 212,029.73
  LT 230 kV CAMACARI II /CARAIBAS BA LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 68,570.67
  LT 230 kV CAMACARI II /COTEGIPE BA LT 230 kV CAMACARI II /COTEGIPE C-2 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 410,591.72
  LT 230 kV CAMACARI II /COTEGIPE BA LT 230 kV CAMACARI II /COTEGIPE C-2 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 432,974.38
  LT 230 kV CAMACARI II /COTEGIPE BA LT 230 kV CAMACARI II /COTEGIPE C-2 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-2 BA 061/2001 IPCA RBNI REA 6258/2017 27/11/2020 27/11/2048 308,526.82
  LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,049,343.41
  LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,395,879.98
  LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,106,546.45
  LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2051 108,483.46
  LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,106,546.45
  LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,049,343.41
  LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,395,879.98
  LT 230 kV CAMACARI II /MATATU BA LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 787,226.14
  LT 230 kV CAMACARI II /PITUACU BA LT 230 kV CAMACARI II /PITUACU C-2 BA RB FT LT 230 kV CAMACARI II /PITUACU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 518,239.20
  LT 230 kV CAMACARI II /PITUACU BA LT 230 kV CAMACARI II /PITUACU C-2 BA RB FT LT 230 kV CAMACARI II /PITUACU C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,590,424.08
  LT 230 kV CAMACARI II /PITUACU BA LT 230 kV CAMACARI II /PITUACU C-2 BA RB FT LT 230 kV CAMACARI II /PITUACU C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 491,448.77
  LT 230 kV CAMACARI IV /COTEGIPE BA LT 230 kV CAMACARI IV /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 423,762.16
  LT 230 kV CAMACARI IV /COTEGIPE BA LT 230 kV CAMACARI IV /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 2891/2011 6/2/2014 6/1/2051 729,203.37
  LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 279,214.59
  LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 264,780.56
  LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 9/1/2014 31/08/2054 1,140,474.37
  LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 8/11/2014 8/10/2054 1,139,207.74
  LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 264,780.56
  LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 279,214.59
  LT 230 kV CAMACARI IV /PITUACU BA LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 518,239.20
  LT 230 kV CAMACARI IV /PITUACU BA LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,590,424.08
  LT 230 kV CAMACARI IV /PITUACU BA LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 491,448.77
  LT 230 kV CAMACARI IV /PITUACU BA LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2891/2011 5/5/2014 5/4/2051 399,334.91
  LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 460,611.04
  LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBNI REA 2891/2011 13/10/2014 10/12/2054 176,235.41
  LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBNI REA 2891/2011 11/5/2014 11/4/2054 176,444.62
  LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 460,611.04
  LT 230 kV CATU /G.MANGABEIRA BA LT 230 kV CATU /G.MANGABEIRA C-1 BA RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2051 30,296.00
  LT 230 kV CATU /G.MANGABEIRA BA LT 230 kV CATU /G.MANGABEIRA C-1 BA RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,293,060.82
  LT 230 kV CAUIPE /FORTALEZA II CE LT 230 kV CAUIPE /FORTALEZA II C-1 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 803,799.57
  LT 230 kV CAUIPE /FORTALEZA II CE LT 230 kV CAUIPE /FORTALEZA II C-2 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 766,782.49
  LT 230 kV CAUIPE /FORTALEZA II CE LT 230 kV CAUIPE /FORTALEZA II C-3 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 971,470.56
  LT 230 kV CAUIPE /FORTALEZA II CE LT 230 kV CAUIPE /FORTALEZA II C-3 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 921,250.28
  LT 230 kV CAUIPE /FORTALEZA II CE LT 230 kV CAUIPE /FORTALEZA II C-3 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,981,345.63
  LT 230 kV CAUIPE /SOBRAL II CE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,971,359.96
  LT 230 kV CAUIPE /SOBRAL II CE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBNI REA 2460/2010 21/11/2013 20/11/2051 69,613.05
  LT 230 kV CAUIPE /SOBRAL II CE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 18,507.84
  LT 230 kV CEARA MIRIM II /EXTREMOZ II RN LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 697,041.42
  LT 230 kV CEARA MIRIM II /EXTREMOZ II RN LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN 019/2010 IPCA RBL CC 019/2010 22/09/2014 23/11/2040 792,705.06
  LT 230 kV CEARA MIRIM II /JOAO CAMARA II RN LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN RB FT LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN 019/2010 IPCA RBL CC 019/2010 22/09/2014 23/11/2040 2,457,385.68
  LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,361,623.13
  LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 2,435.25
  LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RMEL REN 443/2011 10/1/2017 30/09/2074 50,194.50
  LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RMEL REN 443/2011 24/09/2017 23/09/2074 50,179.98
  LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 13,393.83
  LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,371,672.83
  LT 230 kV COTEGIPE /JACARACANGA BA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2048 293,196.70
  LT 230 kV COTEGIPE /JACARACANGA BA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 280,051.51
  LT 230 kV COTEGIPE /JACARACANGA BA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RBNIA REA 3208/2011     190,345.96
  LT 230 kV COTEGIPE /MATATU BA LT 230 kV COTEGIPE /MATATU C-1 BA RB FT LT 230 kV COTEGIPE /MATATU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 524,159.64
  LT 230 kV COTEGIPE /MATATU BA LT 230 kV COTEGIPE /MATATU C-1 BA RB FT LT 230 kV COTEGIPE /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 552,733.25
  LT 230 kV COTEMINAS /LAGOA DO CARRO PB/PE LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE 061/2001 IPCA RBNI REA 9687/2021 22/10/2020 21/10/2048 140,070.88
  LT 230 kV COTEMINAS /PAU FERRO PB/PE LT 230 kV COTEMINAS /PAU FERRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /PAU FERRO C-1 PB/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,652,110.75
  LT 230 kV COTEMINAS /PAU FERRO PB/PE LT 230 kV COTEMINAS /PAU FERRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /PAU FERRO C-1 PB/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,566,704.71
  LT 230 kV COTEMINAS /PAU FERRO PB/PE LT 230 kV COTEMINAS /PAU FERRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /PAU FERRO C-1 PB/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,070,162.06
  LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 345,673.80
  LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 106,814.88
  LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 112,637.70
  LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 112,637.70
  LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 106,814.88
  LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 345,673.80
  LT 230 kV EUNAPOLIS /TEIX. FREITAS II BA LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 3,013,056.01
  LT 230 kV EUNAPOLIS /TEIX. FREITAS II BA LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA 018/2009 IPCA RBL CC 018/2009 8/3/2009 8/3/2039 7,850,161.06
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 25,087.25
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 81,187.25
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBNI REA 10141/2021 15/08/2016 15/08/2048 155,400.80
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 26,454.84
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,088,255.24
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 954,285.87
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,006,307.02
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBNI REA 3208/2011 1/6/2020 1/6/2060 1,219,779.93
  LT 230 kV FORTALEZA /FORTALEZA II CE LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,532.30
  LT 230 kV FORTALEZA /FORTALEZA II CE LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,532.30
  LT 230 kV FORTALEZA /FORTALEZA II CE LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,532.30
  LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 399,916.73
  LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,227,304.29
  LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 379,242.99
  LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 379,242.99
  LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,227,304.29
  LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 399,916.73
  LT 230 kV FUNIL /ITAPEBI BA LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,618,958.81
  LT 230 kV FUNIL /ITAPEBI BA LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,483,571.44
  LT 230 kV FUNIL /ITAPEBI BA LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 8,037,321.68
  LT 230 kV FUNIL /ITAPEBI BA LT 230 kV FUNIL /ITAPEBI C-2 BA RB FT LT 230 kV FUNIL /ITAPEBI C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 8,037,321.68
  LT 230 kV FUNIL /ITAPEBI BA LT 230 kV FUNIL /ITAPEBI C-2 BA RB FT LT 230 kV FUNIL /ITAPEBI C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,483,571.44
  LT 230 kV FUNIL /ITAPEBI BA LT 230 kV FUNIL /ITAPEBI C-2 BA RB FT LT 230 kV FUNIL /ITAPEBI C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,618,958.81
  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 432,974.38

 

69 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBNIA REA 7977/2019     708,386.78
  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,204.60
  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 310,289.72
  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,004,158.06
  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,008,620.98
  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 311,668.78
  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 328,658.84
  LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-1 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE 061/2001 IPCA RBNI REA 5824/2016 16/09/2019 16/09/2048 82,014.64
  LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-1 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 198,305.82
  LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-2 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 198,305.82
  LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-2 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-2 PE 061/2001 IPCA RBNI REA 5824/2016 16/09/2019 16/09/2048 82,014.64
  LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-3 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 267,991.88
  LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-3 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE 061/2001 IPCA RBNI REA 5654/2016 15/12/2017 14/12/2050 51,934.71
  LT 230 kV GOIANINHA /C.GRANDE II PE/PB LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,663,224.60
  LT 230 kV GOIANINHA /C.GRANDE II PE/PB LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBNIA REA 5745/2016     957,816.19
  LT 230 kV GOIANINHA /MUSSURE II PE/PB LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB RB FT LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 668,951.62
  LT 230 kV GOIANINHA /MUSSURE II PE/PB LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB RB FT LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 634,370.09
  LT 230 kV GOIANINHA /SANTA RITA II PE/PB LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB 061/2001 IPCA RBNI REA 10199/2021 17/05/2021 17/05/2054 108,245.94
  LT 230 kV GOIANINHA /SANTA RITA II PE/PB LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 590,251.43
  LT 230 kV GOIANINHA /SANTA RITA II PE/PB LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 559,738.32
  LT 230 kV IBIAPINA II /SOBRAL II CE LT 230 kV IBIAPINA II /SOBRAL II C-1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,531,663.59
  LT 230 kV IBIAPINA II /SOBRAL II CE LT 230 kV IBIAPINA II /SOBRAL II C-1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBNI REA 10142/2021 2/10/2021 2/10/2054 87,170.22
  LT 230 kV ICO /MILAGRES CE LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,411,034.66
  LT 230 kV ICO /MILAGRES CE LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,487,954.64
  LT 230 kV ICO /MILAGRES CE LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBNI REA 1312/2008 13/11/2012 11/12/2052 67,031.18
  LT 230 kV IGAPORA II /B.J.LAPA II BA LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA RB FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA 020/2010 IPCA RBNI REA 3460/2012 6/2/2014 6/2/2054 114,836.56
  LT 230 kV IGAPORA II /B.J.LAPA II BA LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA RB FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040 3,620,331.22
  LT 230 kV IGAPORA II /IGAPORA III BA LT 230 kV IGAPORA II /IGAPORA III C-1 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 117,827.26
  LT 230 kV IGAPORA II /IGAPORA III BA LT 230 kV IGAPORA II /IGAPORA III C-2 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 117,827.26
  LT 230 kV IGAPORA III /PINDAI II BA LT 230 kV IGAPORA III /PINDAI II C-1 BA RB FT LT 230 kV IGAPORA III /PINDAI II C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 2,710,014.16
  LT 230 kV IRECE /BROT.MACAUBAS BA LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,994,673.73
  LT 230 kV IRECE /BROT.MACAUBAS BA LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,121,453.45
  LT 230 kV IRECE /BROT.MACAUBAS BA LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,891,558.85
  LT 230 kV IRECE /BROT.MACAUBAS BA LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042 640,344.19
  LT 230 kV IRECE /BROT.MACAUBAS BA LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RMEL REN 643/2014 6/3/2014 6/2/2039 478,791.58
  LT 230 kV ITABAIANA /ITABAIANINHA SE LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,286,361.02
  LT 230 kV ITABAIANA /ITABAIANINHA SE LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBNI REA 3817/2013 4/10/2017 4/9/2053 565,977.55
  LT 230 kV ITABAIANA /JARDIM SE LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 581,697.06
  LT 230 kV ITABAIANA /JARDIM SE LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 551,626.17
  LT 230 kV ITABAIANA /JARDIM SE LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 551,626.17
  LT 230 kV ITABAIANA /JARDIM SE LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 581,697.06
  LT 230 kV ITABAIANINHA /CATU SE/BA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,410,251.96
  LT 230 kV ITABAIANINHA /CATU SE/BA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RMEL REN 643/2014 28/07/2014 27/07/2047 158,037.42
  LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 621,358.22
  LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 589,237.04
  LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,906,886.01
  LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,906,886.01
  LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 589,237.04
  LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 621,358.22
  LT 230 kV JABOATAO II /PIRAPAMA II PE LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RBNI REA 10092/2021 3/11/2021 3/11/2056 250,103.88
  LT 230 kV JABOATAO II /PIRAPAMA II PE LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 263,401.49
  LT 230 kV JABOATAO II /PIRAPAMA II PE LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 277,760.35
  LT 230 kV JACARACANGA /ALCAN BA LT 230 kV JACARACANGA /ALCAN C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,968.78
  LT 230 kV JACARACANGA /ALCAN BA LT 230 kV JACARACANGA /ALCAN C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 36,573.59
  LT 230 kV JACARACANGA /ALCAN BA LT 230 kV JACARACANGA /ALCAN C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 114,312.46
  LT 230 kV JACARACANGA /DOW QUIMICA BA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 154,591.58
  LT 230 kV JACARACANGA /DOW QUIMICA BA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 156,262.00
  LT 230 kV JACARACANGA /DOW QUIMICA BA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 154,284.00
  LT 230 kV JACARACANGA /DOW QUIMICA BA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 152,634.72
  LT 230 kV JAGUARARI-SE /SR.BONFIM II BA LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,154,068.27
  LT 230 kV JAGUARARI-SE /SR.BONFIM II BA LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,216,980.20
  LT 230 kV JAGUARARI-SE /SR.BONFIM II BA LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2051 72,351.77
  LT 230 kV JUAZEIRO II /JAGUARARI-SE BA LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,055,340.04
  LT 230 kV JUAZEIRO II /JAGUARARI-SE BA LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,000,784.12
  LT 230 kV JUAZEIRO II /SR.BONFIM II BA LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,964,549.62
  LT 230 kV JUAZEIRO II /SR.BONFIM II BA LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,862,992.01
  LT 230 kV LAGOA DO CARRO /PAU FERRO PE LT 230 kV LAGOA DO CARRO /PAU FERRO C-2 PE RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-2 PE 061/2001 IPCA RBNI REA 9687/2021 22/10/2020 21/10/2048 140,070.88
  LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 376,648.85
  LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 357,177.94
  LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,155,897.50
  LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,155,897.50
  LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 357,177.94
  LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 376,648.85
  LT 230 kV MESSIAS /MACEIO II AL LT 230 kV MESSIAS /MACEIO II C-1 AL RB FT LT 230 kV MESSIAS /MACEIO II C-1 AL 005/2012 IPCA RBL CC 005/2012 3/1/2019 5/10/2042 713,921.29
  LT 230 kV MESSIAS /MACEIO II AL LT 230 kV MESSIAS /MACEIO II C-2 AL RB FT LT 230 kV MESSIAS /MACEIO II C-2 AL 005/2012 IPCA RBL CC 005/2012 3/1/2019 5/10/2042 713,921.29
  LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 239,182.75
  LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 226,818.17
  LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 734,027.86
  LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-2 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 174,514.46
  LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-2 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,027.80
  LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-3 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,027.80
  LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-3 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 174,514.46
  LT 230 kV MILAGRES /BANABUIU CE LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,783,710.34
  LT 230 kV MILAGRES /BANABUIU CE LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RMEL REN 643/2014 19/04/2014 18/04/2051 3,168.68
  LT 230 kV MILAGRES /BANABUIU CE LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RMEL REN 643/2014 19/04/2014 18/04/2051 3,168.68
  LT 230 kV MILAGRES /BANABUIU CE LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,822,069.32
  LT 230 kV MILAGRES /BANABUIU CE LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,975,909.28
  LT 230 kV MILAGRES /COREMAS CE/PB LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,999,889.40
  LT 230 kV MILAGRES /COREMAS CE/PB LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,137,459.80
  LT 230 kV MILAGRES /COREMAS CE/PB LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,896,504.89
  LT 230 kV MILAGRES /COREMAS CE/PB LT 230 kV MILAGRES /COREMAS C-2 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-2 CE/PB 008/2005 IGPM RBL CC 008/2005 25/09/2009 3/4/2035 11,221,950.43
  LT 230 kV MILAGRES /TAUA II CE LT 230 kV MILAGRES /TAUA II C-1 CE RB FT LT 230 kV MILAGRES /TAUA II C-1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 3/4/2035 16,482,007.69
  LT 230 kV MORRO CHAPEU II /IRECE BA LT 230 kV MORRO CHAPEU II /IRECE C-1 BA RB FT LT 230 kV MORRO CHAPEU II /IRECE C-1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041 1,867,053.29
  LT 230 kV MOSSORO II /ACU II RN LT 230 kV MOSSORO II /ACU II C-1 RN RB FT LT 230 kV MOSSORO II /ACU II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,194,238.81
  LT 230 kV MOSSORO II /ACU II RN LT 230 kV MOSSORO II /ACU II C-1 RN RB FT LT 230 kV MOSSORO II /ACU II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,664,999.02
  LT 230 kV MOSSORO II /ACU II RN LT 230 kV MOSSORO II /ACU II C-1 RN RB FT LT 230 kV MOSSORO II /ACU II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,132,502.50
  LT 230 kV MOSSORO II /ACU II RN LT 230 kV MOSSORO II /ACU II C-1395 RN RB FT LT 230 kV MOSSORO II /ACU II C-2 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040 1,772,520.96
  LT 230 kV MOSSORO II /ACU II RN LT 230 kV MOSSORO II /ACU II C-1395 RN RB FT LT 230 kV MOSSORO II /ACU II C-2 RN 019/2010 IPCA RBNI REA 4407/2013 27/05/2021 27/05/2058 312,881.68
  LT 230 kV MOSSORO IV /MOSSORO II RN LT 230 kV MOSSORO IV /MOSSORO II C-1 RN RB FT LT 230 kV MOSSORO IV /MOSSORO II C-1 RN 018/2012 IPCA RBL CC 018/2012 28/10/2017 6/1/2042 1,432,331.37
  LT 230 kV N.S.SOCORRO /FAFEN SE LT 230 kV N.S.SOCORRO /FAFEN C-1 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 764,530.28
  LT 230 kV N.S.SOCORRO /FAFEN SE LT 230 kV N.S.SOCORRO /FAFEN C-1 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 247,249.99
  LT 230 kV N.S.SOCORRO /FAFEN SE LT 230 kV N.S.SOCORRO /FAFEN C-1 SE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 244,606.93
  LT 230 kV N.S.SOCORRO /JARDIM SE LT 230 kV N.S.SOCORRO /JARDIM C-1797 SE RB FT LT 230 kV N.S.SOCORRO /JARDIM C-1 SE 005/2012 IPCA RBL CC 005/2012 6/3/2020 5/10/2042 99,148.82
  LT 230 kV N.S.SOCORRO /JARDIM SE LT 230 kV N.S.SOCORRO /JARDIM C-2 SE RB FT LT 230 kV N.S.SOCORRO /JARDIM C-2 SE 005/2012 IPCA RBL CC 005/2012 6/3/2020 5/10/2042 99,148.82
  LT 230 kV N.S.SOCORRO /PENEDO SE/AL LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL RB FT LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 3,139,237.56
  LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 198,411.30
  LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 188,154.40
  LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 608,904.35
  LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-2 RN RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 608,904.35
  LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-2 RN RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 188,154.40

 

70 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-2 RN RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 198,411.30
  LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) BA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-1 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS  /CATU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 4,129.74
  LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) BA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-1 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS  /CATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,354.87
  LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) BA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-2 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS  /CATU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,354.87
  LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) BA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-2 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS  /CATU C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 4,129.74
  LT 230 kV OUROLANDIA II /IRECE BA LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBNI REA 9690/2021 6/4/2019 6/3/2047 236,855.21
  LT 230 kV OUROLANDIA II /IRECE BA LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,256,211.93
  LT 230 kV OUROLANDIA II /IRECE BA LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,191,271.92
  LT 230 kV OUROLANDIA II /IRECE BA LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,855,188.31
  LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL RB FT LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 23,951.77
  LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL RB FT LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 22,713.58
  LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL RB FT LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 28,908.20
  LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL RB FT LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,484.08
  LT 230 kV P.AFONSO III /ANGELIM AL/PE LT 230 kV P.AFONSO III /ANGELIM C-1 AL/PE RB FT LT 230 kV P.AFONSO III /ANGELIM C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,706,662.68
  LT 230 kV P.AFONSO III /BOM NOME AL/PE LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 304,223.80
  LT 230 kV P.AFONSO III /BOM NOME AL/PE LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,860,813.31
  LT 230 kV P.AFONSO III /BOM NOME AL/PE LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,712,923.25
  LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 21,137.90
  LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RBNI REA 2173/2009 9/4/2017 9/3/2053 2,879,521.82
  LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,247,781.88
  LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,241,082.09
  LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 23,427.03
  LT 230 kV P.AFONSO III /GARANHUNS II AL/PE LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,712,823.56
  LT 230 kV P.AFONSO III /GARANHUNS II AL/PE LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,712,823.56
  LT 230 kV P.AFONSO III /GARANHUNS II AL/PE LT 230 kV P.AFONSO III /GARANHUNS II C-4 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-4 AL/PE 061/2001 IPCA RBNI REA 5654/2016 15/12/2017 14/12/2050 944,912.85
  LT 230 kV P.AFONSO III /GARANHUNS II AL/PE LT 230 kV P.AFONSO III /GARANHUNS II C-4 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-4 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,433,645.95
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 9,302.63
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBNI REA 2823/2011 13/08/2013 8/12/2046 158,308.67
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,148,313.01
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,037,255.73
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,592,956.95
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,592,956.95
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,037,255.73
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,148,313.01
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBNI REA 2823/2011 13/08/2013 8/12/2046 158,308.67
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 9,302.63
  LT 230 kV P.AFONSO III /SE Floresta II AL/PE LT 230 kV P.AFONSO III /SE Floresta II C-2 AL/PE RB FT LT 230 kV P.AFONSO III /SE Floresta II C-2 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,318,945.26
  LT 230 kV P.AFONSO III /TACARUTU AL/PE LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RBNI REA 7026/2018 7/1/2018 14/12/2044 73,417.14
  LT 230 kV P.AFONSO III /TACARUTU AL/PE LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 731,960.99
  LT 230 kV P.AFONSO III /USINA PA-I AL/BA LT 230 kV P.AFONSO III /USINA PA-I C-1 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 12,857.00
  LT 230 kV P.AFONSO III /USINA PA-I AL/BA LT 230 kV P.AFONSO III /USINA PA-I C-2 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 12,857.00
  LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-1 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 12,857.00
  LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-2 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 12,857.00
  LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-2 AL/BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 12,719.56
  LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-2 AL/BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 39,755.57
  LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-3 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 12,857.00
  LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA RB FT LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,242.04
  LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA RB FT LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,242.04
  LT 230 kV P.AFONSO III /USINA PA-III AL/BA LT 230 kV P.AFONSO III /USINA PA-III C-1 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 12,857.00
  LT 230 kV P.AFONSO III /USINA PA-III AL/BA LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 12,857.00
  LT 230 kV P.AFONSO III /USINA PA-III AL/BA LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 12,857.00
  LT 230 kV P.AFONSO III /USINA PA-III AL/BA LT 230 kV P.AFONSO III /USINA PA-III C-4 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 12,857.00
  LT 230 kV P.AFONSO III /ZEBU AL LT 230 kV P.AFONSO III /ZEBU C-1 AL RB FT LT 230 kV P.AFONSO III /ZEBU C-1 AL 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 181,884.36
  LT 230 kV P.AFONSO III /ZEBU AL LT 230 kV P.AFONSO III /ZEBU C-2 AL RB FT LT 230 kV P.AFONSO III /ZEBU C-2 AL/BA 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 181,884.36
  LT 230 kV PARAISO /ACU II RN LT 230 kV PARAISO /ACU II C-2 RN RB FT LT 230 kV PARAISO /ACU II C-2 RN 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 4,553,415.34
  LT 230 kV PARAISO /LAGOA NOVA II RN LT 230 kV PARAISO /LAGOA NOVA II C-1 RN RB FT LT 230 kV PARAISO /LAGOA NOVA II C-2 RN 010/2011 IPCA RBL CC 010/2011 13/10/2011 13/10/2041 3,386,569.56
  LT 230 kV PARAISO /NATAL II RN LT 230 kV PARAISO /NATAL II C-1 RN RB FT LT 230 kV PARAISO /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,271,801.30
  LT 230 kV PARAISO /NATAL II RN LT 230 kV PARAISO /NATAL II C-1 RN RB FT LT 230 kV PARAISO /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,206,055.39
  LT 230 kV PARAISO /NATAL II RN LT 230 kV PARAISO /NATAL II C-2 RN RB FT LT 230 kV PARAISO /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,285,021.69
  LT 230 kV PARAISO /NATAL II RN LT 230 kV PARAISO /NATAL II C-2 RN RB FT LT 230 kV PARAISO /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,218,592.35
  LT 230 kV PAU FERRO /C.GRANDE II PE/PB LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,664,446.81
  LT 230 kV PAU FERRO /GOIANINHA PE LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,799,087.88
  LT 230 kV PAU FERRO /GOIANINHA PE LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 555,926.89
  LT 230 kV PAU FERRO /GOIANINHA PE LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 586,232.23
  LT 230 kV PAU FERRO /GOIANINHA PE LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBNI REA 3677/2012 20/05/2019 20/05/2056 607,977.58
  LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RBNI REA 3677/2012 4/12/2016 4/11/2053 1,477,867.80
  LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBNI REA 3677/2012 20/05/2019 20/05/2056 290,921.57
  LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBNI REA 3677/2012 20/05/2019 20/05/2056 1,262,907.00
  LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 252,917.34
  LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 239,842.75
  LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 776,177.91
  LT 230 kV PAU FERRO /SANTA RITA II PE/PB LT 230 kV PAU FERRO /SANTA RITA II C-2856 PE/PB RB FT LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB 017/2009 IPCA RBL CC 017/2009 30/01/2021 8/3/2039 6,588,978.30
  LT 230 kV PICOS /TAUA II PI/CE LT 230 kV PICOS /TAUA II C-1 PI/CE RB FT LT 230 kV PICOS /TAUA II C-1 PI/CE 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 6,071,220.44
  LT 230 kV PIRAPAMA II /SUAPE II PE LT 230 kV PIRAPAMA II /SUAPE II C-1 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 958,803.19
  LT 230 kV PIRAPAMA II /SUAPE II PE LT 230 kV PIRAPAMA II /SUAPE II C-2 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 958,803.19
  LT 230 kV PIRIPIRI /IBIAPINA II PI/CE LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE RB FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE 061/2001 IPCA RBNI REA 10142/2021 2/10/2021 2/10/2054 87,170.22
  LT 230 kV PIRIPIRI /IBIAPINA II PI/CE LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE RB FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,272,201.45
  LT 230 kV PITUACU /NARANDIBA BA LT 230 kV PITUACU /NARANDIBA C-1 BA RB FT LT 230 kV PITUACU /NARANDIBA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 61,871.41
  LT 230 kV PITUACU /NARANDIBA BA LT 230 kV PITUACU /NARANDIBA C-2 BA RB FT LT 230 kV PITUACU /NARANDIBA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 61,871.41
  LT 230 kV PITUACU /NARANDIBA BA LT 230 kV PITUACU /NARANDIBA C-2 BA RB FT LT 230 kV PITUACU /NARANDIBA C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 189,877.16
  LT 230 kV PITUACU /NARANDIBA BA LT 230 kV PITUACU /NARANDIBA C-2 BA RB FT LT 230 kV PITUACU /NARANDIBA C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 58,672.96
  LT 230 kV PITUACU /RL (COTEGIPE / MATATU) BA/PE LT 230 kV PITUACU /RL (COTEGIPE / MATATU) C-1 BA/PE RB FT LT 230 kV PITUACU /RL (COTEGIPE/MATATU) C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 41,297.43
  LT 230 kV PITUACU /RL (COTEGIPE / MATATU) BA/PE LT 230 kV PITUACU /RL (COTEGIPE / MATATU) C-1 BA/PE RB FT LT 230 kV PITUACU /RL (COTEGIPE/MATATU) C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,548.68
  LT 230 kV QUIXERE /MOSSORO II CE/RN LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RBNI REA 6894/2018 7/1/2018 11/11/2044 3,146.46
  LT 230 kV QUIXERE /MOSSORO II CE/RN LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 837,474.62
  LT 230 kV QUIXERE /MOSSORO II CE/RN LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 794,181.28
  LT 230 kV RECIFE II /GOIANINHA PE LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 943,935.68
  LT 230 kV RECIFE II /GOIANINHA PE LT 230 kV RECIFE II /GOIANINHA C-2 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 943,935.68
  LT 230 kV RECIFE II /JABOATAO II PE LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBNI REA 10092/2021 3/11/2021 3/11/2056 250,103.88
  LT 230 kV RECIFE II /JABOATAO II PE LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 123,610.63
  LT 230 kV RECIFE II /JABOATAO II PE LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 117,220.56
  LT 230 kV RECIFE II /JOAIRAM PE LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,735.49
  LT 230 kV RECIFE II /JOAIRAM PE LT 230 kV RECIFE II /JOAIRAM C-2 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 117,397.04
  LT 230 kV RECIFE II /JOAIRAM PE LT 230 kV RECIFE II /JOAIRAM C-3 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 117,397.04
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 409,832.02
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 388,645.71
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RMEL REN 643/2014 12/3/2015 12/2/2043 24,642.74
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 394,914.19
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 416,442.21
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,619,179.09
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 527,609.01
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 500,334.21
  LT 230 kV RECIFE II /PAU FERRO PE LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 416,227.02
  LT 230 kV RECIFE II /PAU FERRO PE LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 438,916.87
  LT 230 kV RECIFE II /PAU FERRO PE LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 438,916.87
  LT 230 kV RECIFE II /PAU FERRO PE LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 416,227.02
  LT 230 kV RECIFE II /PIRAPAMA II PE LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,370.97
  LT 230 kV RECIFE II /PIRAPAMA II PE LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 380,622.05
  LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 948,021.27
  LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 2823/2011 2/1/2016 31/01/2052 2,507,265.85

 

71 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 899,013.21
  LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,909,382.11
  LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 749,595.98
  LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBNI REA 3817/2013 20/08/2019 20/08/2056 23,880.50
  LT 230 kV RIO LARGO II /ARAPIRACA III AL LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2044 404,341.96
  LT 230 kV RIO LARGO II /ARAPIRACA III AL LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,465,566.86
  LT 230 kV RIO LARGO II /ARAPIRACA III AL LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,389,804.22
  LT 230 kV RIO LARGO II /ARAPIRACA III AL LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,497,677.57
  LT 230 kV RIO LARGO II /BRASKEM AL LT 230 kV RIO LARGO II /BRASKEM C-1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 420,654.66
  LT 230 kV RIO LARGO II /BRASKEM AL LT 230 kV RIO LARGO II /BRASKEM C-1 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 416,157.92
  LT 230 kV RUSSAS II /BANABUIU CE LT 230 kV RUSSAS II /BANABUIU C-2 CE RB FT LT 230 kV RUSSAS II /BANABUIU C-1 CE 018/2012 IPCA RBL CC 018/2012 15/12/2020 6/1/2042 4,977,405.38
  LT 230 kV RUSSAS II /QUIXERE CE LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RBNI REA 6894/2018 7/1/2018 11/11/2044 3,146.46
  LT 230 kV RUSSAS II /QUIXERE CE LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 397,090.64
  LT 230 kV RUSSAS II /QUIXERE CE LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 418,737.31
  LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,895,987.24
  LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 8,887,494.13
  LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,746,278.86
  LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RMEL REN 643/2014 24/07/2014 23/07/2039 598,435.53
  LT 230 kV S.JOAO PIAUI /PICOS PI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,665,272.37
  LT 230 kV S.JOAO PIAUI /PICOS PI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 8,625,341.32
  LT 230 kV S.JOAO PIAUI /PICOS PI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,810,564.83
  LT 230 kV SANTA RITA II /MUSSURE II PB LT 230 kV SANTA RITA II /MUSSURE II C-1 PB RB FT LT 230 kV SANTA RITA II /MUSSURE II C-1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 74,631.78
  LT 230 kV SANTA RITA II /MUSSURE II PB LT 230 kV SANTA RITA II /MUSSURE II C-1 PB RB FT LT 230 kV SANTA RITA II /MUSSURE II C-1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 78,700.19
  LT 230 kV SANTA RITA II /MUSSURE II PB LT 230 kV SANTA RITA II /MUSSURE II C-1 PB RB FT LT 230 kV SANTA RITA II /MUSSURE II C-1 PB 061/2001 IPCA RBNI REA 10199/2021 17/05/2021 17/05/2054 108,245.94
  LT 230 kV SAO LUIS II /SAO LUIS III MA LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/12/2040 2,017,434.30
  LT 230 kV SAPEACU /FUNIL BA LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,277,875.67
  LT 230 kV SAPEACU /STO.A.JESUS BA LT 230 kV SAPEACU /STO.A.JESUS C-1 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 423,052.41
  LT 230 kV SAPEACU /STO.A.JESUS BA LT 230 kV SAPEACU /STO.A.JESUS C-2 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,298,305.37
  LT 230 kV SAPEACU /STO.A.JESUS BA LT 230 kV SAPEACU /STO.A.JESUS C-2 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 401,182.67
  LT 230 kV SAPEACU /STO.A.JESUS BA LT 230 kV SAPEACU /STO.A.JESUS C-2 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 423,052.41
  LT 230 kV SE CAMPO FORMOSO /OUROLANDIA II BA LT 230 kV SE CAMPO FORMOSO /OUROLANDIA II C-1 BA RB FT LT 230 kV SE CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,371,319.23
  LT 230 kV SE CAMPO FORMOSO /OUROLANDIA II BA LT 230 kV SE CAMPO FORMOSO /OUROLANDIA II C-1 BA RB FT LT 230 kV SE CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,437,856.53
  LT 230 kV SE CAMPO FORMOSO /OUROLANDIA II BA LT 230 kV SE CAMPO FORMOSO /OUROLANDIA II C-1 BA RB FT LT 230 kV SE CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,446,074.19
  LT 230 kV SE CAMPO FORMOSO /OUROLANDIA II BA LT 230 kV SE CAMPO FORMOSO /OUROLANDIA II C-1 BA RB FT LT 230 kV SE CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBNI REA 9690/2021 6/4/2019 6/3/2047 236,855.21
  LT 230 kV SE Floresta II /BOM NOME PE LT 230 kV SE Floresta II /BOM NOME C-2 PE RB FT LT 230 kV SE Floresta II /BOM NOME C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,540,193.10
  LT 230 kV SOBRAL II /SOBRAL III CE LT 230 kV SOBRAL II /SOBRAL III C-1 CE RB FT LT 230 kV SOBRAL II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 218,929.62
  LT 230 kV SOBRAL II /SOBRAL III CE LT 230 kV SOBRAL II /SOBRAL III C-2 CE RB FT LT 230 kV SOBRAL II /SOBRAL III C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 218,929.62
  LT 230 kV SOBRAL III /ACARAU II CE LT 230 kV SOBRAL III /ACARAU II C-1 CE RB FT LT 230 kV SOBRAL III /ACARAU II C-1 CE 021/2010 IPCA RBL CC 021/2010 4/8/2014 23/11/2040 3,418,696.70
  LT 230 kV SR.BONFIM II /SE CAMPO FORMOSO BA LT 230 kV SR.BONFIM II /SE CAMPO FORMOSO C-1 BA RB FT LT 230 kV SR.BONFIM II /SE CAMPO FORMOSO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 882,105.26
  LT 230 kV SR.BONFIM II /SE CAMPO FORMOSO BA LT 230 kV SR.BONFIM II /SE CAMPO FORMOSO C-1 BA RB FT LT 230 kV SR.BONFIM II /SE CAMPO FORMOSO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,707,092.48
  LT 230 kV SR.BONFIM II /SE CAMPO FORMOSO BA LT 230 kV SR.BONFIM II /SE CAMPO FORMOSO C-1 BA RB FT LT 230 kV SR.BONFIM II /SE CAMPO FORMOSO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 836,504.73
  LT 230 kV STO.A.JESUS /FUNIL BA LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,149,635.04
  LT 230 kV STO.A.JESUS /FUNIL BA LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,566,077.26
  LT 230 kV STO.A.JESUS /FUNIL BA LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,433,423.61
  LT 230 kV STO.A.JESUS /FUNIL BA LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 7,875,033.51
  LT 230 kV SUAPE II /SUAPE III PE LT 230 kV SUAPE II /SUAPE III C-1 PE RB FT LT 230 kV SUAPE II /SUAPE III C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 563,712.00
  LT 230 kV SUAPE II /SUAPE III PE LT 230 kV SUAPE II /SUAPE III C-2 PE RB FT LT 230 kV SUAPE II /SUAPE III C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 563,712.00
  LT 230 kV Tabocas do Brejo Velho /BARREIRAS II BA LT 230 kV Tabocas do Brejo Velho /BARREIRAS II C-1 BA RB FT LT 230 kV Tabocas do Brejo Velho /BARREIRAS II C-1 BA 061/2001 IPCA RBNI REA 9680/2021 19/11/2019 18/11/2047 46,285.99
  LT 230 kV Tabocas do Brejo Velho /BARREIRAS II BA LT 230 kV Tabocas do Brejo Velho /BARREIRAS II C-1 BA RB FT LT 230 kV Tabocas do Brejo Velho /BARREIRAS II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,539,727.84
  LT 230 kV Tabocas do Brejo Velho /BARREIRAS II BA LT 230 kV Tabocas do Brejo Velho /BARREIRAS II C-1 BA RB FT LT 230 kV Tabocas do Brejo Velho /BARREIRAS II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,982,859.66
  LT 230 kV Tabocas do Brejo Velho /BARREIRAS II BA LT 230 kV Tabocas do Brejo Velho /BARREIRAS II C-1 BA RB FT LT 230 kV Tabocas do Brejo Velho /BARREIRAS II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,623,663.29
  LT 230 kV Tabocas do Brejo Velho /BARREIRAS II BA LT 230 kV Tabocas do Brejo Velho /BARREIRAS II C-1 BA RB FT LT 230 kV Tabocas do Brejo Velho /BARREIRAS II C-1 BA 061/2001 IPCA RBNI REA 10198/2021 6/5/2019 6/4/2047 1,041.13
  LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,409,893.10
  LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,980,688.11
  LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,088,661.71
  LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,088,661.71
  LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,980,688.11
  LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,409,893.10
  LT 230 kV TACARUTU /BOM NOME PE LT 230 kV TACARUTU /BOM NOME C-1 PE RB FT LT 230 kV TACARUTU /BOM NOME C-1 PE 061/2001 IPCA RBNI REA 7026/2018 7/1/2018 14/12/2044 73,417.14
  LT 230 kV TACARUTU /BOM NOME PE LT 230 kV TACARUTU /BOM NOME C-1 PE RB FT LT 230 kV TACARUTU /BOM NOME C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,117,127.67
  LT 230 kV TERESINA /PIRIPIRI PI LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,591,146.48
  LT 230 kV TERESINA II /TERESINA III PI LT 230 kV TERESINA II /TERESINA III C-1 PI RB FT LT 230 kV TERESINA II /TERESINA III C-1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 12/9/2041 1,247,399.80
  LT 230 kV TERESINA II /TERESINA III PI LT 230 kV TERESINA II /TERESINA III C-2 PI RB FT LT 230 kV TERESINA II /TERESINA III C-2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 12/9/2041 1,247,399.80
  LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,923.39
  LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 348,903.55
  LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,129,119.95
  LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,129,119.95
  LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 348,903.55
  LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,923.39
  LT 230 kV TOUROS /CEARA MIRIM II RN LT 230 kV TOUROS /CEARA MIRIM II C-1 RN RB FT LT 230 kV TOUROS /CEARA MIRIM II C-1 RN 018/2012 IPCA RBL CC 018/2012 5/12/2017 6/1/2042 2,684,511.15
  LT 230 kV U. A. SALES /P.AFONSO III BA/AL LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 114,724.00
  LT 230 kV U. A. SALES /P.AFONSO III BA/AL LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 113,497.62
  LT 230 kV U. A. SALES /P.AFONSO III BA/AL LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 111,540.76
  LT 230 kV U. A. SALES /P.AFONSO III BA/AL LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,746.00
  LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBNI REA 2891/2011 9/11/2017 9/10/2053 348,498.21
  LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 532,820.73
  LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 561,866.48
  LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 561,866.48
  LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 532,820.73
  LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBNI REA 2891/2011 9/11/2017 9/10/2053 348,498.21
  LT 230 kV UB.ESPERANCA /B. ESPERANCA PI LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,968.15
  LT 230 kV UB.ESPERANCA /B. ESPERANCA PI LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 57,816.40
  LT 500 kV ANGELIM II /PAU FERRO PE LT 500 kV ANGELIM II /PAU FERRO C-1 PE RB FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 6,319,250.80
  LT 500 kV ANGELIM II /PAU FERRO PE LT 500 kV ANGELIM II /PAU FERRO C-1 PE RB FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,663,733.23
  LT 500 kV ANGELIM II /RECIFE II PE LT 500 kV ANGELIM II /RECIFE II C-2 PE RB FT LT 500 kV ANGELIM II /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,979,038.94
  LT 500 kV ANGELIM II /RECIFE II PE LT 500 kV ANGELIM II /RECIFE II C-2 PE RB FT LT 500 kV ANGELIM II /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 6,618,256.75
  LT 500 kV ANGELIM II /RECIFE II PE LT 500 kV ANGELIM II /RECIFE II C-2 PE RB FT LT 500 kV ANGELIM II /RECIFE II C-2 PE 061/2001 IPCA RBNI REA 5654/2016 29/11/2017 28/11/2050 842,183.94
  LT 500 kV CAMACARI IV /CAMACARI II BA LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBNI REA 10135/2021 15/08/2016 15/08/2050 13,309.36
  LT 500 kV CAMACARI IV /CAMACARI II BA LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 124,771.57
  LT 500 kV CAMACARI IV /CAMACARI II BA LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 38,555.02
  LT 500 kV CAMACARI IV /CAMACARI II BA LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,656.78
  LT 500 kV CEARA MIRIM II /C.GRANDE III RN/PB LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 10,546,299.80
  LT 500 kV GARANHUNS II /ANGELIM II PE LT 500 kV GARANHUNS II /ANGELIM II C-1 PE RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RBNI REA 5654/2016 19/09/2017 18/09/2050 59,165.22
  LT 500 kV GARANHUNS II /ANGELIM II PE LT 500 kV GARANHUNS II /ANGELIM II C-1 PE RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 618,018.28
  LT 500 kV GARANHUNS II /ANGELIM II PE LT 500 kV GARANHUNS II /ANGELIM II C-1 PE RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 651,708.42
  LT 500 kV GARANHUNS II /ANGELIM II PE LT 500 kV GARANHUNS II /ANGELIM II C-1 PE RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RMEL REN 643/2014 30/11/2015 29/11/2048 98,166.66
  LT 500 kV JARDIM /CAMACARI IV SE/BA LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBNI REA 10135/2021 15/08/2016 15/08/2050 13,309.36
  LT 500 kV JARDIM /CAMACARI IV SE/BA LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,164,194.54
  LT 500 kV JARDIM /CAMACARI IV SE/BA LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 9,638,755.37
  LT 500 kV JARDIM /CAMACARI IV SE/BA LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 31,192,892.69
  LT 500 kV JOAO CAMARA III /CEARA MIRIM II RN LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN RB FT LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 3,358,754.62
  LT 500 kV JUAZEIRO III /U.SOBRADINHO BA LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBNI REA 9689/2021 31/07/2019 30/07/2047 26,473.30
  LT 500 kV JUAZEIRO III /U.SOBRADINHO BA LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,717,162.48
  LT 500 kV JUAZEIRO III /U.SOBRADINHO BA LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,628,393.58
  LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,383.41
  LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 31,047.92
  LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-2 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 31,047.92
  LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,383.41
  LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-3 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,383.41
  LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-3 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 31,047.92

 

72 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  LT 500 kV MESSIAS /SUAPE II AL/PE LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,516,131.91
  LT 500 kV MESSIAS /SUAPE II AL/PE LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 6,179,279.75
  LT 500 kV MESSIAS /SUAPE II AL/PE LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 19,997,354.71
  LT 500 kV MESSIAS /SUAPE II AL/PE LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBNI REA 10229/2021 21/05/2021 21/05/2055 648,651.95
  LT 500 kV MILAGRES /QUIXADA CE LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,957,132.02
  LT 500 kV MILAGRES /QUIXADA CE LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 10,390,701.86
  LT 500 kV MILAGRES /QUIXADA CE LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 33,626,338.23
  LT 500 kV OLINDINA /CAMACARI II BA LT 500 kV OLINDINA /CAMACARI II C-1 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 5,707,131.77
  LT 500 kV OLINDINA /CAMACARI II BA LT 500 kV OLINDINA /CAMACARI II C-1 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,018,245.65
  LT 500 kV OLINDINA /CAMACARI II BA LT 500 kV OLINDINA /CAMACARI II C-2 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,005,980.20
  LT 500 kV OLINDINA /CAMACARI II BA LT 500 kV OLINDINA /CAMACARI II C-2 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 5,695,500.39
  LT 500 kV OLINDINA /US. L.GONZAGA BA/PE LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 9,638,539.12
  LT 500 kV OLINDINA /US. L.GONZAGA BA/PE LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,163,966.49
  LT 500 kV P. AFONSO IV /ANGELIM II BA/PE LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,055,987.84
  LT 500 kV P. AFONSO IV /ANGELIM II BA/PE LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 8,587,837.55
  LT 500 kV P. AFONSO IV /OLINDINA BA LT 500 kV P. AFONSO IV /OLINDINA C-1 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 8,250,527.45
  LT 500 kV P. AFONSO IV /OLINDINA BA LT 500 kV P. AFONSO IV /OLINDINA C-1 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,700,289.90
  LT 500 kV P. AFONSO IV /USINA XINGO BA/AL LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,199,603.37
  LT 500 kV P. AFONSO IV /USINA XINGO BA/AL LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,085,894.63
  LT 500 kV P. AFONSO IV /USINA XINGO BA/AL LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,750,361.93
  LT 500 kV PAU FERRO /RECIFE II PE LT 500 kV PAU FERRO /RECIFE II C-1 PE RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 249,890.00
  LT 500 kV PAU FERRO /RECIFE II PE LT 500 kV PAU FERRO /RECIFE II C-1 PE RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 236,971.90
  LT 500 kV PECEM II /FORTALEZA II CE LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,797,226.97
  LT 500 kV PECEM II /FORTALEZA II CE LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,704,319.13
  LT 500 kV PECEM II /FORTALEZA II CE LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,515,509.17
  LT 500 kV QUIXADA /FORTALEZA II CE LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 643/2014 27/08/2015 26/08/2052 7,876.02
  LT 500 kV QUIXADA /FORTALEZA II CE LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 17,126,847.64
  LT 500 kV QUIXADA /FORTALEZA II CE LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 5,292,279.12
  LT 500 kV QUIXADA /FORTALEZA II CE LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,580,778.06
  LT 500 kV S.JOAO PIAUI /B. ESPERANCA PI LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,546,605.70
  LT 500 kV S.JOAO PIAUI /B. ESPERANCA PI LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 9,053,092.86
  LT 500 kV SOBRAL III /PECEM II CE LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 20,933,864.34
  LT 500 kV SOBRAL III /PECEM II CE LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 6,468,665.77
  LT 500 kV SOBRAL III /PECEM II CE LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,821,293.29
  LT 500 kV SUAPE II /RECIFE II PE LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 10229/2021 21/05/2021 21/05/2055 648,651.95
  LT 500 kV SUAPE II /RECIFE II PE LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,085,613.68
  LT 500 kV SUAPE II /RECIFE II PE LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 644,464.76
  LT 500 kV SUAPE II /RECIFE II PE LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 679,596.58
  LT 500 kV TERESINA II /P.DUTRA PI/MA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,499,954.28
  LT 500 kV TERESINA II /P.DUTRA PI/MA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 8,060,548.20
  LT 500 kV TERESINA II /P.DUTRA PI/MA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 26,085,506.41
  LT 500 kV TERESINA II /P.DUTRA PI/MA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RMEL REN 643/2014 30/09/2015 29/09/2040 745,673.51
  LT 500 kV TERESINA II /P.DUTRA PI/MA LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,491,777.32
  LT 500 kV TERESINA II /TIANGUA II PI/CE LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBNI REA 9688/2021 19/09/2019 18/09/2047 440,129.36
  LT 500 kV TERESINA II /TIANGUA II PI/CE LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,673,348.64
  LT 500 kV TIANGUA II /SOBRAL III CE LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,990,358.53
  LT 500 kV TIANGUA II /SOBRAL III CE LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBNI REA 9688/2021 10/3/2019 10/2/2047 437,266.31
  LT 500 kV U.SOBRADINHO /S.JOAO PIAUI BA/PI LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,626,697.22
  LT 500 kV U.SOBRADINHO /S.JOAO PIAUI BA/PI LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 8,180,739.15
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 97,041.72
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 31,047.92
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,383.41
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,383.41
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 31,047.92
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 97,041.72
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-3 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 97,041.72
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-3 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 31,047.92
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,383.41
  LT 500 kV US. L.GONZAGA /GARANHUNS II PE LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,504,081.11
  LT 500 kV US. L.GONZAGA /GARANHUNS II PE LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 9,012,766.58
  LT 500 kV US. L.GONZAGA /GARANHUNS II PE LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RMEL REN 643/2014 30/11/2015 29/11/2048 1,697,998.65
  LT 500 kV US. L.GONZAGA /JUAZEIRO III PE/BA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBNI REA 9689/2021 31/07/2019 30/07/2047 26,473.30
  LT 500 kV US. L.GONZAGA /JUAZEIRO III PE/BA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 9,638,539.12
  LT 500 kV US. L.GONZAGA /JUAZEIRO III PE/BA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,163,966.49
  LT 500 kV US. L.GONZAGA /MILAGRES PE/CE LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,436,216.68
  LT 500 kV US. L.GONZAGA /MILAGRES PE/CE LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 28,958,801.73
  LT 500 kV US. L.GONZAGA /MILAGRES PE/CE LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 8,948,410.41
  LT 500 kV USINA XINGO /JARDIM AL/SE LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,533,394.39
  LT 500 kV USINA XINGO /JARDIM AL/SE LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 6,195,649.84
  LT 500 kV USINA XINGO /JARDIM AL/SE LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 20,050,331.53
  LT 500 kV USINA XINGO /MESSIAS AL LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 27,478,239.07
  LT 500 kV USINA XINGO /MESSIAS AL LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 8,490,909.36
  LT 500 kV USINA XINGO /MESSIAS AL LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,953,775.79
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,186.74
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-1 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,757.15
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-1 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 124,262.82
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-2 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 124,262.82
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-2 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,757.15
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-2 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,186.74
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-3 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,186.74
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-3 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,757.15
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-3 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 124,262.82
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-4 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 124,262.82
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-4 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,757.15
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-4 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,186.74
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-5 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 35,721.55
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-5 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 35,339.69
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-5 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 110,455.84
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-6 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 110,455.84
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-6 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 35,339.69
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-6 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 35,721.55
  LT 69 kV ABAIXADORA /MOXOTO BA LT 69 kV ABAIXADORA /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 61,920.98
  LT 69 kV ABAIXADORA /MULUNGU BA LT 69 kV ABAIXADORA /MULUNGU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,940.83
  LT 69 kV ABAIXADORA /ZEBU BA/AL LT 69 kV ABAIXADORA /ZEBU C-1 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 63,089.30
  LT 69 kV CAMACARI II /CAMACARI II BA LT 69 kV CAMACARI II /CAMACARI II C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 17,615.40
  LT 69 kV CATU /COTEGIPE BA LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RMEL REN 643/2014 18/05/2015 17/05/2048 275,556.07
  LT 69 kV CATU /COTEGIPE BA LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 382,680.17
  LT 69 kV CATU /COTEGIPE BA LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 382,680.17
  LT 69 kV CATU /COTEGIPE BA LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RMEL REN 643/2014 18/05/2015 17/05/2048 275,556.07
  LT 69 kV MATATU /PITUACU BA LT 69 kV MATATU /PITUACU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 70,721.18
  LT 69 kV MATATU /PITUACU BA LT 69 kV MATATU /PITUACU C-1 BA DIT   061/2001 IPCA RMEL REN 643/2014 18/05/2015 17/05/2048 287,877.91
  LT 69 kV MATATU /PITUACU BA LT 69 kV MATATU /PITUACU C-1 BA DIT   061/2001 IPCA RMEL REN 643/2014 23/12/2015 22/12/2040 25,673.29
  LT 69 kV MATATU /PITUACU BA LT 69 kV MATATU /PITUACU C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 69,778.23
  LT 69 kV MOD.REDUZIDO /RL (ABAIXADORA / MOXOTO) BA LT 69 kV MOD.REDUZIDO /RL (ABAIXADORA / MOXOTO) C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 6,328.40
  LT 69 kV PEDRA /JEQUIE BA LT 69 kV PEDRA /JEQUIE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 219,546.88
  LT 69 kV PEDRA /JEQUIE BA LT 69 kV PEDRA /JEQUIE C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 217,199.96
  LT 69 kV PITUACU /COTEGIPE BA LT 69 kV PITUACU /COTEGIPE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 191,025.77
  LT 69 kV PITUACU /COTEGIPE BA LT 69 kV PITUACU /COTEGIPE C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 189,297.03
  LT 69 kV ZEBU /MOXOTO BA LT 69 kV ZEBU /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 260,107.49
  LT 69 kV ZEBU /MOXOTO BA LT 69 kV ZEBU /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 83,219.85

 

73 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  LT 69 kV ZEBU /MOXOTO BA LT 69 kV ZEBU /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,119.07
  MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBNI REA 2040/2009 28/01/2013 27/01/2043 52,240.08
  MACEIO IB 230 kV MG 230 kV MACEIO MG1 AL IB1 RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  MACEIO IB 230 kV MG 230 kV MACEIO MG1 AL IB1 RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 100,801.10
  MACEIO IB 230 kV MG 230 kV MACEIO MG1 AL IB1 RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 326,212.02
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR1 AL RBF FT TR 230/69 kV MACEIO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR4 AL RBF FT TR 230/69 kV MACEIO TR4 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR1 AL RBF FT TR 230/69 kV MACEIO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 64,854.03
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 64,854.03
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 61,501.39
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 199,030.50
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 64,854.03
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 61,501.39
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 199,030.50
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR4 AL RBF FT TR 230/69 kV MACEIO TR4 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 64,854.03
  MACEIO MG 230 kV MACEIO MG1 AL RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 459,927.55
  MACEIO MG 230 kV MACEIO MG1 AL RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 436,151.54
  MACEIO MG 230 kV MACEIO MG1 AL RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,411,471.48
  MACEIO TR 230/69 kV MACEIO TR1 AL RBF FT TR 230/69 kV MACEIO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MACEIO TR 230/69 kV MACEIO TR1 AL RBF FT TR 230/69 kV MACEIO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  MACEIO TR 230/69 kV MACEIO TR1 AL RBF FT TR 230/69 kV MACEIO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  MACEIO TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MACEIO TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  MACEIO TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  MACEIO TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MACEIO TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  MACEIO TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  MACEIO TR 230/69 kV MACEIO TR4 AL RBF FT TR 230/69 kV MACEIO TR4 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MACEIO TT 69/0 kV MACEIO TA2 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  MACEIO II EL 230 kV MACEIO II LT 230 kV MESSIAS /MACEIO II C-1 AL RB FT LT 230 kV MESSIAS /MACEIO II C-1 AL 005/2012 IPCA RBL CC 005/2012 3/1/2019 5/10/2042 451,845.11
  MACEIO II EL 230 kV MACEIO II LT 230 kV MESSIAS /MACEIO II C-2 AL RB FT LT 230 kV MESSIAS /MACEIO II C-2 AL 005/2012 IPCA RBL CC 005/2012 3/1/2019 5/10/2042 451,845.11
  MACEIO II EL 69 kV MACEIO II  DIST1 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 5/10/2042 142,024.83
  MACEIO II EL 69 kV MACEIO II  DIST2 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 5/10/2042 142,024.83
  MACEIO II EL 69 kV MACEIO II  DIST3 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 5/10/2042 142,024.83
  MACEIO II EL 69 kV MACEIO II  DIST4 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 5/10/2042 142,024.83
  MACEIO II IB 230 kV MG 230 kV MACEIO II MG1 AL IB1 RB FT MG 230 kV MACEIO II MG1 AL 005/2012 IPCA RBL CC 005/2012 3/1/2019 5/10/2042 257,415.48
  MACEIO II IB 69 kV MG 230 kV MACEIO II MG1 AL IB1 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 5/10/2042 83,430.19
  MACEIO II MC 230 kV TR 230/69 kV MACEIO II TR1 AL RBF FT TR 230/69 kV MACEIO II TR1 AL 005/2012 IPCA RBL CC 005/2012 3/1/2019 5/10/2042 294,933.17
  MACEIO II MC 230 kV TR 230/69 kV MACEIO II TR2 AL RBF FT TR 230/69 kV MACEIO II TR2 AL 005/2012 IPCA RBL CC 005/2012 3/1/2019 5/10/2042 294,933.17
  MACEIO II MC 69 kV TR 230/69 kV MACEIO II TR1 AL RBF FT TR 230/69 kV MACEIO II TR1 AL 005/2012 IPCA RBL CC 005/2012 3/1/2019 5/10/2042 120,048.54
  MACEIO II MC 69 kV TR 230/69 kV MACEIO II TR2 AL RBF FT TR 230/69 kV MACEIO II TR2 AL 005/2012 IPCA RBL CC 005/2012 3/1/2019 5/10/2042 120,048.54
  MACEIO II MC 69 kV TT 69/0 kV MACEIO II TT1 AL DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 5/10/2042 51,281.24
  MACEIO II MG 230 kV MACEIO II MG1 AL RB FT MG 230 kV MACEIO II MG1 AL 005/2012 IPCA RBL CC 005/2012 3/1/2019 5/10/2042 844,553.70
  MACEIO II TR 230/69 kV MACEIO II TR1 AL RBF FT TR 230/69 kV MACEIO II TR1 AL 005/2012 IPCA RBL CC 005/2012 3/1/2019 5/10/2042 1,038,421.28
  MACEIO II TR 230/69 kV MACEIO II TR2 AL RBF FT TR 230/69 kV MACEIO II TR2 AL 005/2012 IPCA RBL CC 005/2012 3/1/2019 5/10/2042 1,038,421.28
  MACEIO II TT 69/0 kV MACEIO II TT1 AL DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 5/10/2042 137,622.80
  MATATU BC 69 kV 27,1 Mvar MATATU BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,634.31
  MATATU CS 20/-10 Mvar MATATU CS1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 692,982.69
  MATATU CS 20/-10 Mvar MATATU CS2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 692,982.69
  MATATU EL 11,9 kV MATATU  DIS10 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  MATATU EL 11,9 kV MATATU  DIS10 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  MATATU EL 11,9 kV MATATU  DIS11 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  MATATU EL 11,9 kV MATATU  DIS11 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  MATATU EL 11,9 kV MATATU  DIS12 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  MATATU EL 11,9 kV MATATU  DIS12 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  MATATU EL 11,9 kV MATATU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  MATATU EL 11,9 kV MATATU  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  MATATU EL 11,9 kV MATATU  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  MATATU EL 11,9 kV MATATU  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  MATATU EL 11,9 kV MATATU  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  MATATU EL 11,9 kV MATATU  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  MATATU EL 11,9 kV MATATU  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  MATATU EL 11,9 kV MATATU  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  MATATU EL 11,9 kV MATATU  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  MATATU EL 11,9 kV MATATU  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  MATATU EL 11,9 kV MATATU  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  MATATU EL 11,9 kV MATATU  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  MATATU EL 11,9 kV MATATU  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  MATATU EL 11,9 kV MATATU  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  MATATU EL 11,9 kV MATATU  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  MATATU EL 11,9 kV MATATU  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  MATATU EL 11,9 kV MATATU  DIST9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  MATATU EL 11,9 kV MATATU  DIST9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  MATATU EL 230 kV MATATU LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MATATU EL 230 kV MATATU LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 2/2/2014 2/1/2042 34,485.47
  MATATU EL 230 kV MATATU LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RMEL REN 443/2011 13/02/2015 2/12/2038 18,872.29
  MATATU EL 230 kV MATATU LT 230 kV COTEGIPE /MATATU C-1 BA RB FT LT 230 kV COTEGIPE /MATATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 11/10/2013 11/9/2041 34,235.78
  MATATU EL 230 kV MATATU LT 230 kV COTEGIPE /MATATU C-1 BA RB FT LT 230 kV COTEGIPE /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MATATU EL 69 kV MATATU  AMARALINA 02V3 DIT   061/2001 IPCA RCDM REA 2376/2010 25/05/2014 24/05/2044 7,666.79
  MATATU EL 69 kV MATATU  AMARALINA 02V3 DIT   061/2001 IPCA RCDM REA 2376/2010 25/05/2014 24/05/2045 29,617.59
  MATATU EL 69 kV MATATU  AMARALINA 02V3 DIT   061/2001 IPCA RCDM REA 2376/2010 25/05/2014 24/05/2045 27,584.27
  MATATU EL 69 kV MATATU  AMARALINA 02V3 DIT   061/2001 IPCA RCDM REA 2837/2011 30/01/2020 29/01/2053 39,757.11
  MATATU EL 69 kV MATATU  AMARALINA 02V3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MATATU EL 69 kV MATATU  AMARALINA 02V3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MATATU EL 69 kV MATATU  CANDEAL 02V4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MATATU EL 69 kV MATATU  CANDEAL 02V4 DIT   061/2001 IPCA RCDM REA 2837/2011 31/12/2019 30/12/2052 39,700.39
  MATATU EL 69 kV MATATU  CANDEAL 02V4 DIT   061/2001 IPCA RCDM REA 2376/2010 5/10/2014 5/9/2044 22,803.38
  MATATU EL 69 kV MATATU  CANDEAL 02V4 DIT   061/2001 IPCA RCDM REA 2376/2010 22/03/2014 21/03/2045 27,281.51
  MATATU EL 69 kV MATATU  CENTRAL 02V2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MATATU EL 69 kV MATATU  DIST1 DIT   061/2001 IPCA RMEL REN 443/2011 10/12/2015 10/11/2045 7,389.32
  MATATU EL 69 kV MATATU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MATATU EL 69 kV MATATU  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MATATU EL 69 kV MATATU  DIST2 DIT   061/2001 IPCA RCDM REA 5484/2015 4/11/2014 4/10/2044 25,658.45
  MATATU EL 69 kV MATATU  DIST2 DIT   061/2001 IPCA RCDM REA 2837/2011 6/1/2013 31/05/2045 31,581.56
  MATATU EL 69 kV MATATU  GRACA 02V6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MATATU EL 69 kV MATATU  LAPINHA 02V7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MATATU EL 69 kV MATATU  LAPINHA 02V7 DIT   061/2001 IPCA RCDM REA 2837/2011 31/12/2019 30/12/2052 39,700.39
  MATATU EL 69 kV MATATU  LAPINHA 02V7 DIT   061/2001 IPCA RCDM REA 2376/2010 4/5/2014 4/4/2044 7,636.11

 

74 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  MATATU EL 69 kV MATATU  LAPINHA 02V7 DIT   061/2001 IPCA RCDM REA 2376/2010 5/10/2014 5/9/2044 15,315.18
  MATATU EL 69 kV MATATU  PITUACU 02J5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MATATU IB 11,9 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,720.57
  MATATU IB 11,9 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 27,424.24
  MATATU IB 230 kV MG 230 kV MATATU MG1 BA IB1 RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  MATATU IB 230 kV MG 230 kV MATATU MG1 BA IB1 RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBNIA REA 7806/2019     628,175.95
  MATATU IB 69 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  MATATU IB 69 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  MATATU IB 69 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  MATATU MC 11,9 kV CS 20/-10 Mvar MATATU CS1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 57,859.72
  MATATU MC 11,9 kV CS 20/-10 Mvar MATATU CS1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 57,241.20
  MATATU MC 11,9 kV CS 20/-10 Mvar MATATU CS2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 57,859.72
  MATATU MC 11,9 kV TR 11,9/0,22 kV MATATU TR6 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 44,484.03
  MATATU MC 11,9 kV TR 11,9/0,22 kV MATATU TR6 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 42,184.43
  MATATU MC 11,9 kV TR 11,9/0,22 kV MATATU TR7 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 44,484.03
  MATATU MC 11,9 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 44,484.03
  MATATU MC 11,9 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 42,184.43
  MATATU MC 11,9 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 44,484.03
  MATATU MC 230 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MATATU MC 230 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  MATATU MC 230 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  MATATU MC 230 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RMEL REN 443/2011 2/2/2016 2/1/2046 12,057.03
  MATATU MC 230 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MATATU MC 230 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  MATATU MC 230 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RMEL REN 443/2011 27/11/2016 26/11/2046 14,405.54
  MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RMEL REN 443/2011 27/11/2016 26/11/2046 14,405.54
  MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RMEL REN 443/2011 27/11/2016 26/11/2046 14,405.54
  MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RMEL REN 443/2011 2/2/2016 2/1/2046 3,054.55
  MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  MATATU MC 230 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  MATATU MC 230 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  MATATU MC 230 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MATATU MC 230 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RMEL REN 443/2011 4/10/2016 4/9/2039 19,635.66
  MATATU MC 230 kV TR 230/69 kV MATATU TR3 BA RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MATATU MC 230 kV TR 230/69 kV MATATU TR3 BA RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  MATATU MC 230 kV TR 230/69 kV MATATU TR3 BA RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  MATATU MC 230 kV TR 230/69 kV MATATU TR4 BA RBF FT TR 230/69 kV MATATU TR4 BA 061/2001 IPCA RBNIA REA 7806/2019     769,960.04
  MATATU MC 4,16 kV CS 20/-10 Mvar MATATU CS1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,539.12
  MATATU MC 4,16 kV CS 20/-10 Mvar MATATU CS1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 53,956.11
  MATATU MC 4,16 kV CS 20/-10 Mvar MATATU CS2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,539.12
  MATATU MC 4,16 kV CS 20/-10 Mvar MATATU CS2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 53,956.11
  MATATU MC 4,16 kV CS 20/-10 Mvar MATATU CS2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 168,642.31
  MATATU MC 4,16 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  MATATU MC 4,16 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 38,868.36
  MATATU MC 4,16 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  MATATU MC 4,16 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 38,868.36
  MATATU MC 4,16 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 125,785.60
  MATATU MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  MATATU MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  MATATU MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  MATATU MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA DIT   061/2001 IPCA RCDM REA 7761/2019 5/2/2019 5/1/2055 18,509.32
  MATATU MC 69 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBNI REA 2837/2011 2/2/2020 2/1/2050 45,197.64
  MATATU MC 69 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBNI REA 3578/2012 25/11/2019 24/11/2052 33,754.92
  MATATU MC 69 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MATATU MC 69 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MATATU MC 69 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBNI REA 3578/2012 25/11/2019 24/11/2052 33,754.92
  MATATU MC 69 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBNI REA 2837/2011 25/11/2019 24/11/2049 22,518.94
  MATATU MC 69 kV TR 230/69 kV MATATU TR3 BA RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBNI REA 3578/2012 25/11/2019 24/11/2052 33,754.92
  MATATU MC 69 kV TR 230/69 kV MATATU TR3 BA RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MATATU MC 69 kV TR 230/69 kV MATATU TR4 BA RBF FT TR 230/69 kV MATATU TR4 BA 061/2001 IPCA RBNIA REA 7806/2019     300,343.85
  MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 595,013.56
  MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 564,254.26
  MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,826,036.87
  MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2043 17,706.55
  MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBNIA REA 7806/2019     156,652.96
  MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBNIA REA 7806/2019     35,027.88
  MATATU RTS 13,8 kV 15 Mvar MATATU RTR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 139,359.98
  MATATU TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,494.87
  MATATU TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,388.74
  MATATU TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,954.14
  MATATU TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,494.87
  MATATU TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,388.74
  MATATU TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,954.14
  MATATU TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RMEL REN 443/2011 2/2/2016 2/1/2046 12,057.03
  MATATU TR 230/11,9 kV MATATU TRR1 BA RBF FT TR 230/11,9 kV MATATU TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,494.87
  MATATU TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MATATU TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  MATATU TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  MATATU TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MATATU TR 230/69 kV MATATU TR3 BA RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MATATU TR 230/69 kV MATATU TR4 BA RBF FT TR 230/69 kV MATATU TR4 BA 061/2001 IPCA RBNIA REA 7806/2019     1,137,851.96
  MATATU TT 69/13,8 kV MATATU TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  MATATU TT 69/13,8 kV MATATU TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  MATATU TT 69/13,8 kV MATATU TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  MATATU TT 69/13,8 kV MATATU TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBNI REA 2040/2009 11/9/2015 11/8/2046 166,206.83
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 20,252.45
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 20,252.45
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBNI REA 2040/2009 2/5/2018 2/4/2048 146,911.71
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO II C-1 AL RB FT LT 230 kV MESSIAS /MACEIO II C-1 AL 005/2012 IPCA RBL CC 005/2012 3/1/2019 5/10/2042 451,845.11
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO II C-2 AL RB FT LT 230 kV MESSIAS /MACEIO II C-2 AL 005/2012 IPCA RBL CC 005/2012 3/1/2019 5/10/2042 451,845.11
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92

 

75 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-2 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-2 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-2 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-3 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-3 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-3 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  MESSIAS EL 500 kV MESSIAS LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  MESSIAS EL 500 kV MESSIAS LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  MESSIAS EL 500 kV MESSIAS LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,322,567.42
  MESSIAS EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBNI REA 5861/2016 5/8/2016 5/7/2044 24,244.01
  MESSIAS EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RMEL REN 643/2014 12/8/2013 12/7/2043 14,902.27
  MESSIAS EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  MESSIAS EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  MESSIAS EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,322,567.42
  MESSIAS IB 230 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  MESSIAS IB 230 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  MESSIAS IB 230 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 374,783.88
  MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB2 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB2 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB2 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 133,743.70
  MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 432,820.70
  MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 133,743.70
  MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 432,820.70
  MESSIAS MC 500 kV RTL 500 kV 150 Mvar MESSIAS RT1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,697.68
  MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,167,288.04
  MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,697.68
  MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,167,288.04
  MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RMEL REN 643/2014 22/05/2015 21/05/2043 43,343.63
  MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RMEL REN 443/2011 26/09/2016 25/09/2033 26,150.22
  MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,245,845.61
  MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,181,441.48
  MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,823,375.12
  MESSIAS RTL 500 kV 150 Mvar MESSIAS RT1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,178.08
  MESSIAS RTL 500 kV 150 Mvar MESSIAS RT1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 673,465.34
  MESSIAS RTL 500 kV 150 Mvar MESSIAS RT1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,179,465.23
  MESSIAS RTL 500 kV 150 Mvar MESSIAS RT1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RMEL REN 643/2014 14/12/2013 13/12/2048 27,793.24
  MESSIAS RTL 500 kV 50 Mvar MESSIAS RTR1 AL RB FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL 061/2001 IPCA RMEL REN 643/2014 2/6/2014 2/5/2049 9,298.68
  MESSIAS RTL 500 kV 50 Mvar MESSIAS RTR1 AL RB FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 236,726.03
  MESSIAS RTL 500 kV 50 Mvar MESSIAS RTR1 AL RB FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 224,488.45
  MESSIAS RTL 500 kV 50 Mvar MESSIAS RTR1 AL RB FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 726,488.41
  MESSIAS TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  MESSIAS TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,624,997.02
  MESSIAS TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,258,807.35
  MESSIAS TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RMEL REN 643/2014 15/09/2013 14/09/2047 66,352.27
  MESSIAS TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  MESSIAS TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,624,997.02
  MESSIAS TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,258,807.35
  MESSIAS TR 500/230 kV MESSIAS TRR1 AL RB FT TR 500/230 kV MESSIAS TRR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 571,193.59
  MESSIAS TR 500/230 kV MESSIAS TRR1 AL RB FT TR 500/230 kV MESSIAS TRR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 541,665.67
  MESSIAS TR 500/230 kV MESSIAS TRR1 AL RB FT TR 500/230 kV MESSIAS TRR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,752,935.78
  MESSIAS TR 69/13,8 kV MESSIAS TR3 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  MESSIAS TR 69/13,8 kV MESSIAS TR3 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  MESSIAS TR 69/13,8 kV MESSIAS TR3 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,846.49
  MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 166,756.08
  MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 539,655.22
  MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,846.49
  MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 166,756.08
  MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 539,655.22
  MILAGRES BC 69 kV 20,3 Mvar MILAGRES BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,472.99
  MILAGRES CE 58/-35 MvAr MILAGRES CE1 CE RB FT CE 58/-35 MvAr MILAGRES CE1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,355,374.35
  MILAGRES CE 58/-35 MvAr MILAGRES CE1 CE RB FT CE 58/-35 MvAr MILAGRES CE1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,285,308.13
  MILAGRES CE 58/-35 MvAr MILAGRES CE1 CE RB FT CE 58/-35 MvAr MILAGRES CE1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,159,507.83
  MILAGRES CE 58/-35 MvAr MILAGRES CE2 CE RB FT CE 58/-35 MvAr MILAGRES CE2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,355,374.35
  MILAGRES CE 58/-35 MvAr MILAGRES CE2 CE RB FT CE 58/-35 MvAr MILAGRES CE2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,285,308.13
  MILAGRES CE 58/-35 MvAr MILAGRES CE2 CE RB FT CE 58/-35 MvAr MILAGRES CE2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,159,507.83
  MILAGRES EL 13,8 kV MILAGRES  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MILAGRES EL 13,8 kV MILAGRES  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MILAGRES EL 13,8 kV MILAGRES  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MILAGRES EL 13,8 kV MILAGRES  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MILAGRES EL 13,8 kV MILAGRES  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-1 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RMEL REN 443/2011 23/01/2016 22/01/2046 12,388.89
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBNI REA 3578/2012 26/01/2016 25/01/2046 53,595.89
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  MILAGRES EL 230 kV MILAGRES LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MILAGRES EL 230 kV MILAGRES LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBNI REA 3578/2012 6/7/2016 6/6/2048 149,600.51
  MILAGRES EL 230 kV MILAGRES LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RMEL REN 443/2011 7/11/2015 7/10/2045 12,203.47
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RBNI REA 3578/2012 2/1/2016 31/01/2049 95,919.97
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RMEL REN 643/2014 26/11/2013 25/11/2041 34,283.34
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RMEL REN 643/2014 29/09/2013 28/09/2041 34,110.94
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBNI REA 3578/2012 14/12/2015 13/12/2048 95,590.26
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBNI REA 5861/2016 2/2/2014 2/1/2042 31,688.15
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-2 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-2 CE/PB 008/2005 IGPM RBL CC 008/2005 25/09/2009 3/4/2035 1,084,203.57
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /TAUA II C-1 CE RB FT LT 230 kV MILAGRES /TAUA II C-1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 3/4/2035 980,190.02
  MILAGRES EL 500 kV MILAGRES LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/12/2015 17/12/2045 15,797.36
  MILAGRES EL 500 kV MILAGRES LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/12/2015 17/12/2045 15,797.36
  MILAGRES EL 500 kV MILAGRES LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/12/2015 17/12/2045 15,797.36
  MILAGRES EL 500 kV MILAGRES LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  MILAGRES EL 500 kV MILAGRES LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 443/2011 3/8/2016 3/7/2046 16,362.77
  MILAGRES EL 500 kV MILAGRES LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 443/2011 3/8/2016 3/7/2046 16,362.77

 

76 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  MILAGRES EL 500 kV MILAGRES LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 443/2011 3/8/2016 3/7/2046 16,362.77
  MILAGRES EL 69 kV MILAGRES  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MILAGRES EL 69 kV MILAGRES  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MILAGRES EL 69 kV MILAGRES  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MILAGRES EL 69 kV MILAGRES  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  MILAGRES EL 69 kV MILAGRES  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MILAGRES EL 69 kV MILAGRES  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MILAGRES EL 69 kV MILAGRES  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MILAGRES EL 69 kV MILAGRES  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MILAGRES EL 69 kV MILAGRES  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MILAGRES EL 69 kV MILAGRES  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MILAGRES EL 69 kV MILAGRES  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MILAGRES EL 69 kV MILAGRES  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MILAGRES EL 69 kV MILAGRES  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  MILAGRES EL 69 kV MILAGRES  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MILAGRES EL 69 kV MILAGRES  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MILAGRES EL 69 kV MILAGRES  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  MILAGRES EL 69 kV MILAGRES  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MILAGRES IB 13,8 kV MG 500 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,720.57
  MILAGRES IB 13,8 kV MG 500 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 27,424.24
  MILAGRES IB 13,8 kV MG 500 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 85,715.73
  MILAGRES IB 230 kV MG 230 kV MILAGRES MG1 CE IB1 RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  MILAGRES IB 230 kV MG 230 kV MILAGRES MG1 CE IB1 RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 100,801.10
  MILAGRES IB 500 kV MG 500 kV MILAGRES MG1 CE IB1 RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 2891/2011 15/12/2014 14/12/2045 1,595,061.20
  MILAGRES IB 500 kV MG 500 kV MILAGRES MG1 CE IB1 RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 443/2011 12/8/2015 12/7/2045 16,311.34
  MILAGRES IB 500 kV MG 500 kV MILAGRES MG1 CE IB1 RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 443/2011 12/8/2015 12/7/2045 16,311.34
  MILAGRES IB 500 kV MG 500 kV MILAGRES MG1 CE IB1 RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 443/2011 12/8/2015 12/7/2045 16,311.34
  MILAGRES IB 500 kV MG 500 kV MILAGRES MG1 CE IB3 RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 3929/2013 29/04/2016 28/04/2047 1,647,092.43
  MILAGRES IB 69 kV MG 230 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  MILAGRES IB 69 kV MG 230 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  MILAGRES IB 69 kV MG 230 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  MILAGRES MC 13,8 kV RTB 13,8 kV 10 Mvar MILAGRES RT2 CE RBF FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  MILAGRES MC 13,8 kV RTB 13,8 kV 10 Mvar MILAGRES RT2 CE RBF FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,473.00
  MILAGRES MC 13,8 kV RTB 13,8 kV 5 MVAr MILAGRES RT1 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  MILAGRES MC 13,8 kV RTB 13,8 kV 5 MVAr MILAGRES RT1 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,473.00
  MILAGRES MC 13,8 kV RTB 13,8 kV 5 MVAr MILAGRES RT3 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  MILAGRES MC 13,8 kV RTB 13,8 kV 5 MVAr MILAGRES RT3 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,473.00
  MILAGRES MC 13,8 kV TR 13,8/13,8 kV MILAGRES TREG1 CE MC1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  MILAGRES MC 13,8 kV TR 13,8/13,8 kV MILAGRES TREG1 CE MC2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  MILAGRES MC 13,8 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  MILAGRES MC 13,8 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 38,868.36
  MILAGRES MC 13,8 kV TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  MILAGRES MC 13,8 kV TR 69/13,8 kV MILAGRES TR6 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  MILAGRES MC 13,8 kV TR 69/13,8 kV MILAGRES TR6 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,904.70
  MILAGRES MC 13,8 kV TR 69/13,8 kV MILAGRES TR7 CE TR8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  MILAGRES MC 13,8 kV TR 69/13,8 kV MILAGRES TR7 CE TR8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,904.70
  MILAGRES MC 13,8 kV TR 69/13,8 kV MILAGRES TR7 CE TR8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 124,724.00
  MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 153,015.11
  MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 145,104.98
  MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 469,588.01
  MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 153,015.11
  MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 145,104.98
  MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 469,588.01
  MILAGRES MC 230 kV CE 58/-35 MvAr MILAGRES CE1 CE CE2 RB FT CE 58/-35 MvAr MILAGRES CE1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,744.46
  MILAGRES MC 230 kV RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,896.88
  MILAGRES MC 230 kV RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBNI REA 3929/2013 11/4/2015 11/3/2046 85,558.13
  MILAGRES MC 230 kV RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RMEL REN 443/2011 27/10/2015 26/10/2045 13,978.90
  MILAGRES MC 230 kV RTL 230 kV 10 MVAr MILAGRES RT1 CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  MILAGRES MC 230 kV RTL 230 kV 10 MVAr MILAGRES RT2 CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  MILAGRES MC 230 kV RTL 230 kV 10 MVAr MILAGRES RT3 CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  MILAGRES MC 230 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MILAGRES MC 230 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBNI REA 3578/2012 4/12/2016 4/11/2049 96,397.73
  MILAGRES MC 230 kV TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBNI REA 3578/2012 6/7/2016 6/6/2048 95,468.43
  MILAGRES MC 230 kV TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MILAGRES MC 230 kV TR 230/69 kV MILAGRES TR9 CE RBF FT TR 230/69 kV MILAGRES TR9 CE 061/2001 IPCA RBNI REA 2173/2009 15/08/2012 14/08/2042 930,652.97
  MILAGRES MC 230 kV TR 500/230 kV MILAGRES TR1 CE RB FT TR 500/230 kV MILAGRES TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MILAGRES MC 230 kV TR 500/230 kV MILAGRES TR2 CE RB FT TR 500/230 kV MILAGRES TR2 CE 061/2001 IPCA RBNI REA 2891/2011 2/9/2015 2/8/2045 990,427.80
  MILAGRES MC 230 kV TR 500/230 kV MILAGRES TR3 CE RB FT TR 500/230 kV MILAGRES TR3 CE 061/2001 IPCA RBNI REA 3929/2013 29/04/2016 28/04/2047 969,556.50
  MILAGRES MC 500 kV RTB 500 kV 99,1 MVAr MILAGRES RT2 CE RB FT RTB 500 kV 99,1 MVAr MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 356,129.72
  MILAGRES MC 500 kV RTL 500 kV 120 Mvar MILAGRES RT1 CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  MILAGRES MC 500 kV RTL 500 kV 180 Mvar MILAGRES RT3 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  MILAGRES MC 500 kV TR 500/230 kV MILAGRES TR2 CE RB FT TR 500/230 kV MILAGRES TR2 CE 061/2001 IPCA RBNI REA 2891/2011 2/9/2015 2/8/2046 1,681,207.85
  MILAGRES MC 500 kV TR 500/230 kV MILAGRES TR3 CE RB FT TR 500/230 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  MILAGRES MC 69 kV BC 69 kV 20,3 Mvar MILAGRES BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  MILAGRES MC 69 kV BC 69 kV 20,3 Mvar MILAGRES BC1 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  MILAGRES MC 69 kV BC 69 kV 20,3 Mvar MILAGRES BC1 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  MILAGRES MC 69 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MILAGRES MC 69 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  MILAGRES MC 69 kV TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MILAGRES MC 69 kV TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  MILAGRES MC 69 kV TR 230/69 kV MILAGRES TR9 CE RBF FT TR 230/69 kV MILAGRES TR9 CE 061/2001 IPCA RBNI REA 2173/2009 15/08/2012 14/08/2042 362,695.34
  MILAGRES MC 69 kV TR 69/13,8 kV MILAGRES TR6 CE TR7 e TR8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,615.66
  MILAGRES MC 69 kV TR 69/13,8 kV MILAGRES TR6 CE TR7 e TR8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 56,010.45
  MILAGRES MC 69 kV TT 69/13,8 kV MILAGRES TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  MILAGRES MC 69 kV TT 69/13,8 kV MILAGRES TA2 CE DIT   061/2001 IPCA RCDM REA 2460/2010 22/06/2012 21/06/2043 265,541.69
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 2891/2011 15/12/2014 14/12/2042 176,162.10
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 2173/2009 15/08/2012 14/08/2040 142,886.59
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 2460/2010 22/06/2012 21/06/2040 47,320.85
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 443/2011 28/09/2016 27/09/2033 28,917.56
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 643/2014 28/10/2015 27/10/2032 27,754.27
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 643/2014 29/10/2015 28/10/2032 27,757.73
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 643/2014 29/10/2015 28/10/2032 30,660.40
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 164,003.92
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,193,990.05
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,132,266.60
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,664,235.61
  MILAGRES MG 500 kV MILAGRES MG1 CE RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 3929/2013 29/04/2016 28/04/2045 870,645.28
  MILAGRES MG 500 kV MILAGRES MG1 CE RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 643/2014 2/3/2014 2/2/2031 23,125.08
  MILAGRES MG 500 kV MILAGRES MG1 CE RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 2891/2011 15/12/2014 14/12/2043 664,979.62
  MILAGRES RTB 13,8 kV 10 Mvar MILAGRES RT2 CE RBF FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,809.15
  MILAGRES RTB 13,8 kV 10 Mvar MILAGRES RT2 CE RBF FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 124,995.26
  MILAGRES RTB 13,8 kV 10 Mvar MILAGRES RT2 CE RBF FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 404,509.05
  MILAGRES RTB 13,8 kV 5 MVAr MILAGRES RT1 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  MILAGRES RTB 13,8 kV 5 MVAr MILAGRES RT1 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  MILAGRES RTB 13,8 kV 5 MVAr MILAGRES RT3 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  MILAGRES RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 198,548.97
  MILAGRES RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 188,284.96
  MILAGRES RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 609,326.87
  MILAGRES RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBNI REA 3929/2013 11/4/2015 11/3/2041 79,902.64
  MILAGRES RTB 230 kV 3,33 MVAr MILAGRES RTR1 CE RB FT RTB 230 kV 3,33 MVAr MILAGRES RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,047.53

 

77 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  MILAGRES RTB 230 kV 3,33 MVAr MILAGRES RTR1 CE RB FT RTB 230 kV 3,33 MVAr MILAGRES RTR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 47,460.32
  MILAGRES RTB 500 kV 40 MVAr MILAGRES RTR1 CE RB FT RTB 500 kV 40 MVAr MILAGRES RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,965.90
  MILAGRES RTB 500 kV 99,1 MVAr MILAGRES RT2 CE RB FT RTB 500 kV 99,1 MVAr MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 288,108.70
  MILAGRES RTB 500 kV 99,1 MVAr MILAGRES RT2 CE RB FT RTB 500 kV 99,1 MVAr MILAGRES RT2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2015 25/11/2045 16,371.29
  MILAGRES RTB 500 kV 99,1 MVAr MILAGRES RT2 CE RB FT RTB 500 kV 99,1 MVAr MILAGRES RT2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2015 25/11/2045 16,371.29
  MILAGRES RTB 500 kV 99,1 MVAr MILAGRES RT2 CE RB FT RTB 500 kV 99,1 MVAr MILAGRES RT2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2015 25/11/2045 16,371.29
  MILAGRES RTL 230 kV 10 MVAr MILAGRES RT1 CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  MILAGRES RTL 230 kV 10 MVAr MILAGRES RT1 CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 142,537.77
  MILAGRES RTL 230 kV 10 MVAr MILAGRES RT2 CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  MILAGRES RTL 230 kV 10 MVAr MILAGRES RT3 CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  MILAGRES RTL 230 kV 10 MVAr MILAGRES RT3 CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 142,537.77
  MILAGRES RTL 230 kV 10 MVAr MILAGRES RT3 CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 461,280.03
  MILAGRES RTL 500 kV 120 Mvar MILAGRES RT1 CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 659,897.68
  MILAGRES RTL 500 kV 180 Mvar MILAGRES RT3 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 643/2014 27/12/2013 26/12/2048 39,846.57
  MILAGRES RTL 500 kV 180 Mvar MILAGRES RT3 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 318,233.71
  MILAGRES RTL 500 kV 60 Mvar MILAGRES RTR2 CE RB FT RTL 500 kV 60 Mvar MILAGRES RTR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,420.05
  MILAGRES RTS 13,8 kV 18,75 Mvar MILAGRES RT1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 144,668.20
  MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 353,089.34
  MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 353,089.34
  MILAGRES TR 13,8/13,8 kV MILAGRES TREG1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 80,554.63
  MILAGRES TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MILAGRES TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  MILAGRES TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  MILAGRES TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MILAGRES TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  MILAGRES TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  MILAGRES TR 230/69 kV MILAGRES TR9 CE RBF FT TR 230/69 kV MILAGRES TR9 CE 061/2001 IPCA RBNI REA 2173/2009 15/08/2012 14/08/2046 1,198,846.83
  MILAGRES TR 500/230 kV MILAGRES TR1 CE RB FT TR 500/230 kV MILAGRES TR1 CE 061/2001 IPCA RMEL REN 643/2014 25/08/2013 24/08/2047 45,374.99
  MILAGRES TR 500/230 kV MILAGRES TR1 CE RB FT TR 500/230 kV MILAGRES TR1 CE 061/2001 IPCA RMEL REN 643/2014 15/12/2013 14/12/2043 48,083.67
  MILAGRES TR 500/230 kV MILAGRES TR1 CE RB FT TR 500/230 kV MILAGRES TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  MILAGRES TR 500/230 kV MILAGRES TR2 CE RB FT TR 500/230 kV MILAGRES TR2 CE 061/2001 IPCA RBNI REA 2891/2011 2/9/2015 2/8/2050 4,724,597.69
  MILAGRES TR 500/230 kV MILAGRES TR3 CE RB FT TR 500/230 kV MILAGRES TR3 CE 061/2001 IPCA RBNI REA 3929/2013 29/04/2016 28/04/2051 4,848,592.87
  MILAGRES TR 69/13,8 kV MILAGRES TR6 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,200.80
  MILAGRES TR 69/13,8 kV MILAGRES TR6 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 44,717.61
  MILAGRES TR 69/13,8 kV MILAGRES TR6 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 139,766.96
  MILAGRES TR 69/13,8 kV MILAGRES TR7 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  MILAGRES TR 69/13,8 kV MILAGRES TR8 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  MILAGRES TT 69/13,8 kV MILAGRES TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  MILAGRES TT 69/13,8 kV MILAGRES TA2 CE DIT   061/2001 IPCA RCDM REA 2460/2010 22/06/2012 21/06/2042 246,561.56
  MIRUEIRA BC 69 kV 20,3 Mvar MIRUEIRA BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,472.99
  MIRUEIRA BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,472.99
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RMEL REN 643/2014 2/2/2014 2/1/2042 35,253.24
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RBNI REA 2040/2009 7/7/2014 7/6/2044 38,716.92
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RMEL REN 643/2014 11/10/2013 11/9/2041 34,235.78
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RMEL REN 643/2014 12/8/2013 12/7/2041 34,319.01
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RMEL REN 643/2014 26/01/2014 25/01/2042 34,464.67
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MIRUEIRA EL 69 kV MIRUEIRA  DIS10 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MIRUEIRA EL 69 kV MIRUEIRA  DIS10 DIT   061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2043 8,301.43
  MIRUEIRA EL 69 kV MIRUEIRA  DIS11 DIT   061/2001 IPCA RMEL REN 643/2014 28/07/2015 27/07/2042 8,439.88
  MIRUEIRA EL 69 kV MIRUEIRA  DIS11 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MIRUEIRA EL 69 kV MIRUEIRA  DIS12 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MIRUEIRA EL 69 kV MIRUEIRA  DIS12 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MIRUEIRA EL 69 kV MIRUEIRA  DIS12 DIT   061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2042 6,361.73
  MIRUEIRA EL 69 kV MIRUEIRA  DIS13 DIT   061/2001 IPCA RMEL REN 443/2011 18/04/2016 17/04/2043 2,027.08
  MIRUEIRA EL 69 kV MIRUEIRA  DIS13 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MIRUEIRA EL 69 kV MIRUEIRA  DIS13 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MIRUEIRA EL 69 kV MIRUEIRA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MIRUEIRA EL 69 kV MIRUEIRA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MIRUEIRA EL 69 kV MIRUEIRA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  MIRUEIRA EL 69 kV MIRUEIRA  DIST1 DIT   061/2001 IPCA RMEL REN 643/2014 26/06/2015 25/06/2043 4,166.83
  MIRUEIRA EL 69 kV MIRUEIRA  DIST1 DIT   061/2001 IPCA RMEL REN 643/2014 7/2/2015 7/1/2043 4,143.20
  MIRUEIRA EL 69 kV MIRUEIRA  DIST2 DIT   061/2001 IPCA RMEL REN 643/2014 29/06/2015 28/06/2043 2,083.94
  MIRUEIRA EL 69 kV MIRUEIRA  DIST2 DIT   061/2001 IPCA RMEL REN 643/2014 30/06/2015 29/06/2043 4,168.21
  MIRUEIRA EL 69 kV MIRUEIRA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MIRUEIRA EL 69 kV MIRUEIRA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MIRUEIRA EL 69 kV MIRUEIRA  DIST3 DIT   061/2001 IPCA RMEL REN 643/2014 18/06/2015 17/06/2043 4,164.09
  MIRUEIRA EL 69 kV MIRUEIRA  DIST3 DIT   061/2001 IPCA RMEL REN 643/2014 17/06/2015 16/06/2043 4,163.74
  MIRUEIRA EL 69 kV MIRUEIRA  DIST4 DIT   061/2001 IPCA RMEL REN 643/2014 22/06/2015 21/06/2043 4,165.45
  MIRUEIRA EL 69 kV MIRUEIRA  DIST4 DIT   061/2001 IPCA RMEL REN 643/2014 13/07/2015 7/12/2043 4,146.95
  MIRUEIRA EL 69 kV MIRUEIRA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MIRUEIRA EL 69 kV MIRUEIRA  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MIRUEIRA EL 69 kV MIRUEIRA  DIST5 DIT   061/2001 IPCA RMEL REN 643/2014 23/06/2015 22/06/2043 4,165.81
  MIRUEIRA EL 69 kV MIRUEIRA  DIST5 DIT   061/2001 IPCA RMEL REN 643/2014 7/3/2015 7/2/2043 4,143.55
  MIRUEIRA EL 69 kV MIRUEIRA  DIST6 DIT   061/2001 IPCA RMEL REN 643/2014 7/7/2015 7/6/2043 4,144.91
  MIRUEIRA EL 69 kV MIRUEIRA  DIST6 DIT   061/2001 IPCA RMEL REN 643/2014 29/06/2015 28/06/2043 2,083.94
  MIRUEIRA EL 69 kV MIRUEIRA  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MIRUEIRA EL 69 kV MIRUEIRA  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MIRUEIRA EL 69 kV MIRUEIRA  DIST7 DIT   061/2001 IPCA RMEL REN 643/2014 7/6/2015 7/5/2045 3,826.34
  MIRUEIRA EL 69 kV MIRUEIRA  DIST7 DIT   061/2001 IPCA RMEL REN 643/2014 7/8/2015 7/7/2045 3,826.94
  MIRUEIRA EL 69 kV MIRUEIRA  DIST8 DIT   061/2001 IPCA RMEL REN 643/2014 7/1/2015 30/06/2043 4,142.87
  MIRUEIRA EL 69 kV MIRUEIRA  DIST8 DIT   061/2001 IPCA RMEL REN 643/2014 7/10/2015 7/9/2043 4,145.94
  MIRUEIRA EL 69 kV MIRUEIRA  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MIRUEIRA EL 69 kV MIRUEIRA  DIST9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MIRUEIRA EL 69 kV MIRUEIRA  DIST9 DIT   061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2043 2,075.36
  MIRUEIRA EL 69 kV MIRUEIRA  DIST9 DIT   061/2001 IPCA RMEL REN 643/2014 7/9/2015 7/8/2043 4,145.59
  MIRUEIRA IB 230 kV MG 230 kV MIRUEIRA MG1 PE IB1 RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  MIRUEIRA IB 230 kV MG 230 kV MIRUEIRA MG1 PE IB1 RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 100,801.10
  MIRUEIRA IB 230 kV MG 230 kV MIRUEIRA MG1 PE IB1 RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 326,212.02
  MIRUEIRA IB 69 kV MG 230 kV MIRUEIRA MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  MIRUEIRA IB 69 kV MG 230 kV MIRUEIRA MG1 PE IB1 DIT   061/2001 IPCA RMEL REN 643/2014 19/06/2015 18/06/2043 4,164.43
  MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR3 PE RBF FT TR 230/69 kV MIRUEIRA TR3 PE 061/2001 IPCA RMEL REN 643/2014 11/10/2015 11/9/2043 4,081.27
  MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR3 PE RBF FT TR 230/69 kV MIRUEIRA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RMEL REN 443/2011 24/04/2016 23/04/2046 14,172.34
  MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54

 

78 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE DIT   061/2001 IPCA RMEL REN 643/2014 11/9/2015 11/8/2043 2,040.47
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RMEL REN 643/2014 11/9/2015 11/8/2043 4,080.94
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RMEL REN 643/2014 3/9/2014 3/8/2044 32,204.31
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RMEL REN 643/2014 11/9/2015 11/8/2043 2,040.47
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RMEL REN 643/2014 11/10/2015 11/9/2043 4,081.27
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR3 PE RBF FT TR 230/69 kV MIRUEIRA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RMEL REN 443/2011 4/4/2016 4/3/2044 1,980.97
  MIRUEIRA MC 69 kV TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RMEL REN 643/2014 18/12/2013 17/12/2046 32,434.68
  MIRUEIRA MC 69 kV TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,531.97
  MIRUEIRA MC 69 kV TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 48,868.02
  MIRUEIRA MC 69 kV TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 158,146.45
  MIRUEIRA MG 230 kV MIRUEIRA MG1 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 583,664.64
  MIRUEIRA MG 230 kV MIRUEIRA MG1 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 553,492.03
  MIRUEIRA MG 230 kV MIRUEIRA MG1 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,791,208.18
  MIRUEIRA MG 230 kV MIRUEIRA MG1 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 28,817.16
  MIRUEIRA MG 230 kV MIRUEIRA MG1 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/07/2014 29/07/2042 72,686.99
  MIRUEIRA TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MIRUEIRA TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  MIRUEIRA TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MIRUEIRA TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  MIRUEIRA TR 230/69 kV MIRUEIRA TR3 PE RBF FT TR 230/69 kV MIRUEIRA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MIRUEIRA TR 230/69 kV MIRUEIRA TR3 PE RBF FT TR 230/69 kV MIRUEIRA TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  MIRUEIRA TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MIRUEIRA TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  MIRUEIRA TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  MIRUEIRA TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  MIRUEIRA TT 69/13,8 kV MIRUEIRA TA1 PE DIT   061/2001 IPCA RCDM REA 3578/2012 14/06/2016 13/06/2046 196,829.13
  MIRUEIRA TT 69/13,8 kV MIRUEIRA TA2 PE DIT   061/2001 IPCA RCDM REA 3578/2012 14/06/2016 13/06/2046 196,829.13
  MIRUEIRA II EL 230 kV MIRUEIRA II LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RBNI REA 10092/2021 3/11/2021 3/11/2049 131,990.95
  MIRUEIRA II EL 230 kV MIRUEIRA II LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBNI REA 10092/2021 3/11/2021 3/11/2049 131,990.95
  MIRUEIRA II EL 69 kV MIRUEIRA II  DIST1 DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 6/1/2042 151,266.67
  MIRUEIRA II EL 69 kV MIRUEIRA II  DIST2 DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 6/1/2042 151,266.67
  MIRUEIRA II EL 69 kV MIRUEIRA II  DIST3 DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 6/1/2042 151,266.67
  MIRUEIRA II EL 69 kV MIRUEIRA II  DIST4 DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 6/1/2042 151,266.67
  MIRUEIRA II IB 230 kV MG 230 kV MIRUEIRA II MG1 PE IB1 RB FT MG 230 kV MIRUEIRA II MG1 PE 017/2012 IPCA RBL CC 017/2012 4/12/2016 6/1/2042 372,437.87
  MIRUEIRA II IB 69 kV MG 230 kV MIRUEIRA II MG1 PE IB1 DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 6/1/2042 88,215.44
  MIRUEIRA II MC 230 kV TR 230/69 kV MIRUEIRA II TR1 PE RBF FT TR 230/69 kV MIRUEIRA II TR1 PE 017/2012 IPCA RBL CC 017/2012 4/12/2016 6/1/2042 427,838.61
  MIRUEIRA II MC 230 kV TR 230/69 kV MIRUEIRA II TR2 PE RBF FT TR 230/69 kV MIRUEIRA II TR2 PE 017/2012 IPCA RBL CC 017/2012 4/12/2016 6/1/2042 427,838.61
  MIRUEIRA II MC 69 kV TR 230/69 kV MIRUEIRA II TR1 PE RBF FT TR 230/69 kV MIRUEIRA II TR1 PE 017/2012 IPCA RBL CC 017/2012 4/12/2016 6/1/2042 405,676.67
  MIRUEIRA II MC 69 kV TR 230/69 kV MIRUEIRA II TR2 PE RBF FT TR 230/69 kV MIRUEIRA II TR2 PE 017/2012 IPCA RBL CC 017/2012 4/12/2016 6/1/2042 405,676.67
  MIRUEIRA II MC 69 kV TT 69/0 kV MIRUEIRA II TT1 PE DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 6/1/2042 54,771.67
  MIRUEIRA II MG 230 kV MIRUEIRA II MG1 PE RB FT MG 230 kV MIRUEIRA II MG1 PE 017/2012 IPCA RBL CC 017/2012 4/12/2016 6/1/2042 1,111,140.42
  MIRUEIRA II TR 230/69 kV MIRUEIRA II TR1 PE RBF FT TR 230/69 kV MIRUEIRA II TR1 PE 017/2012 IPCA RBL CC 017/2012 4/12/2016 6/1/2042 1,332,544.45
  MIRUEIRA II TR 230/69 kV MIRUEIRA II TR2 PE RBF FT TR 230/69 kV MIRUEIRA II TR2 PE 017/2012 IPCA RBL CC 017/2012 4/12/2016 6/1/2042 1,332,544.45
  MIRUEIRA II TT 69/0 kV MIRUEIRA II TT1 PE DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 6/1/2042 52,669.45
  MOD.REDUZIDO EL 13,8 kV MOD.REDUZIDO  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  MOD.REDUZIDO EL 13,8 kV MOD.REDUZIDO  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  MOD.REDUZIDO EL 13,8 kV MOD.REDUZIDO  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  MOD.REDUZIDO EL 69 kV MOD.REDUZIDO LT 69 kV MOD.REDUZIDO /ABAIXADORA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 62,583.94
  MOD.REDUZIDO MG 69 kV MOD.REDUZIDO MG1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 171,892.05
  MOD.REDUZIDO MG 69 kV MOD.REDUZIDO MG1 BA DIT   061/2001 IPCA RMEL REN 443/2011 9/9/2016 9/8/2033 16,270.94
  MOD.REDUZIDO TR 69/13,8 kV MOD.REDUZIDO TR1 BA DIT   061/2001 IPCA RCDM REA 2460/2010 8/1/2012 31/07/2045 393,545.28
  MOD.REDUZIDO TR 69/13,8 kV MOD.REDUZIDO TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  MORRO CHAPEU II EL 230 kV MORRO CHAPEU II LT 230 kV MORRO CHAPEU II /IRECE C-1 BA RB FT LT 230 kV MORRO CHAPEU II /IRECE C-1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041 401,617.04
  MORRO CHAPEU II IB 230 kV MG 230 kV MORRO CHAPEU II MG1 BA IB1 RB FT MG 230 kV MORRO CHAPEU II MG1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041 209,186.56
  MORRO CHAPEU II IB 69 kV MG 69 kV MORRO CHAPEU II MG1 BA IB1 ICG   009/2011 IPCA RICG CC 009/2011 8/6/2017 13/10/2041 104,859.03
  MORRO CHAPEU II MC 230 kV RTB 230 kV 0 Mvar MORRO CHAPEU II RT1 BA RB FT RTB 230 kV 20 Mvar MORRO CHAPEU II RT1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041 265,932.02
  MORRO CHAPEU II MC 230 kV TR 230/69 kV MORRO CHAPEU II TR1 BA ICG   009/2011 IPCA RICG CC 009/2011 8/6/2017 13/10/2041 376,030.64
  MORRO CHAPEU II MC 69 kV TR 230/69 kV MORRO CHAPEU II TR1 BA ICG   009/2011 IPCA RICG CC 009/2011 8/6/2017 13/10/2041 152,950.22
  MORRO CHAPEU II MC 69 kV TT 69/0 kV MORRO CHAPEU II TA1 BA ICG   009/2011 IPCA RICG CC 009/2011 8/6/2017 13/10/2041 64,551.44
  MORRO CHAPEU II MG 230 kV MORRO CHAPEU II MG1 BA RB FT MG 230 kV MORRO CHAPEU II MG1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041 591,333.95
  MORRO CHAPEU II MG 69 kV MORRO CHAPEU II MG1 BA ICG   009/2011 IPCA RICG CC 009/2011 8/6/2017 13/10/2041 66,285.65
  MORRO CHAPEU II RTB 230 kV 0 Mvar MORRO CHAPEU II RT1 BA RB FT RTB 230 kV 20 Mvar MORRO CHAPEU II RT1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041 387,861.51
  MORRO CHAPEU II TR 230/69 kV MORRO CHAPEU II TR1 BA ICG   009/2011 IPCA RICG CC 009/2011 8/6/2017 13/10/2041 1,186,719.96
  MORRO CHAPEU II TT 69/0 kV MORRO CHAPEU II TA1 BA ICG   009/2011 IPCA RICG CC 009/2011 8/6/2017 13/10/2041 173,401.39
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 25,881.87
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 25,881.87
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 25,881.87
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 25,881.87
  MOSSORO II CE 20/-0 Mvar MOSSORO II CE1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 480,170.51
  MOSSORO II CE 20/-0 Mvar MOSSORO II CE1 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 475,037.56
  MOSSORO II CE 20/-0 Mvar MOSSORO II CE1 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,484,751.87
  MOSSORO II EL 230 kV MOSSORO II  AREIA BRANCA DIT   061/2001 IPCA RCDM REA 6674/2017 7/1/2018 4/1/2038 111,322.08
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN 061/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2042 35,380.13
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN 061/2001 IPCA RBNI REA 2173/2009 6/6/2016 6/5/2046 1,235,832.61
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU II C-1 RN RB FT LT 230 kV MOSSORO II /ACU II C-1 RN 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU II C-1 RN RB FT LT 230 kV MOSSORO II /ACU II C-1 RN 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2031 103,531.43
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU II C-1 RN RB FT LT 230 kV MOSSORO II /ACU II C-1 RN 061/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2046 14,202.42
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU II C-1 RN RB FT LT 230 kV MOSSORO II /ACU II C-1 RN 061/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2046 14,202.42
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU II C-1 RN RB FT LT 230 kV MOSSORO II /ACU II C-1 RN 061/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2046 14,202.42
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU II C-1 RN RB FT LT 230 kV MOSSORO II /ACU II C-1 RN 061/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2046 14,202.42
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU II C-1 RN RB FT LT 230 kV MOSSORO II /ACU II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU II C-1 RN RB FT LT 230 kV MOSSORO II /ACU II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU II C-1395 RN RB FT LT 230 kV MOSSORO II /ACU II C-2 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040 318,261.74
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO IV /MOSSORO II C-1 RN RB FT LT 230 kV MOSSORO IV /MOSSORO II C-1 RN 018/2012 IPCA RBL CC 018/2012 28/10/2017 6/1/2042 441,712.23
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RMEL REN 443/2011 5/7/2017 5/6/2047 60,376.05
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RMEL REN 643/2014 30/04/2014 29/04/2042 34,744.06
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  MOSSORO II EL 69 kV MOSSORO II  BARAUNAS 02J9 DIT   061/2001 IPCA RCDM REA 2376/2010 23/10/2014 22/10/2044 411,896.68
  MOSSORO II EL 69 kV MOSSORO II  BARROCAS-02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MOSSORO II EL 69 kV MOSSORO II  BARROCAS-02J4 DIT   061/2001 IPCA RMEL REN 443/2011 5/10/2016 5/9/2030 2,995.85
  MOSSORO II EL 69 kV MOSSORO II  C.AMARO-02J5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MOSSORO II EL 69 kV MOSSORO II  C.AMARO-02J5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MOSSORO II EL 69 kV MOSSORO II  GROSSOS-02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MOSSORO II EL 69 kV MOSSORO II  GROSSOS-02J6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30

 

79 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  MOSSORO II EL 69 kV MOSSORO II  GROSSOS-02J6 DIT   061/2001 IPCA RMEL REN 443/2011 5/10/2016 5/9/2030 2,902.09
  MOSSORO II EL 69 kV MOSSORO II  MAISA-02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MOSSORO II EL 69 kV MOSSORO II  MAISA-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MOSSORO II EL 69 kV MOSSORO II  MAISA-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  MOSSORO II EL 69 kV MOSSORO II  MOSSORO I-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MOSSORO II EL 69 kV MOSSORO II  MOSSORO I-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MOSSORO II EL 69 kV MOSSORO II  MOSSORO I-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  MOSSORO II EL 69 kV MOSSORO II  MOSSORO I-02J3 DIT   061/2001 IPCA RMEL REN 443/2011 5/10/2016 5/9/2030 2,902.09
  MOSSORO II EL 69 kV MOSSORO II  MOSSOROIII-02J2 DIT   061/2001 IPCA RMEL REN 443/2011 5/10/2016 5/9/2030 2,902.09
  MOSSORO II EL 69 kV MOSSORO II  MOSSOROIII-02J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MOSSORO II EL 69 kV MOSSORO II  ROSADO 02J8 DIT   061/2001 IPCA RCDM REA 1814/2009 23/10/2014 22/10/2044 411,896.68
  MOSSORO II EL 69 kV MOSSORO II  ROSADO-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MOSSORO II IB 230 kV MG 230 kV MOSSORO II MG1 RN IB1 RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  MOSSORO II IB 69 kV MG 230 kV MOSSORO II MG1 RN IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,860.37
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN 061/2001 IPCA RMEL REN 443/2011 5/12/2016 5/11/2030 2,902.87
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,860.37
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN 061/2001 IPCA RMEL REN 443/2011 5/12/2016 5/11/2030 1,451.44
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,860.37
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,860.37
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN 061/2001 IPCA RMEL REN 443/2011 5/12/2016 5/11/2030 1,451.44
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,473.00
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,285.27
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,473.00
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,285.27
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,473.00
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,285.27
  MOSSORO II MC 13,8 kV TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  MOSSORO II MC 13,8 kV TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  MOSSORO II MC 230 kV RTB 230 kV 20 Mvar MOSSORO II RT1 RN RB FT RTB 230 kV 20 Mvar MOSSORO II RT1 RN 061/2001 IPCA RBNI REA 3620/2012 26/05/2014 25/05/2045 1,028,205.70
  MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RMEL REN 443/2011 23/01/2015 22/01/2038 12,556.20
  MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2047 60,314.63
  MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR3 RN RBF FT TR 230/69 kV MOSSORO II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR6 RN RBF FT TR 230/69 kV MOSSORO II TR6 RN 061/2001 IPCA RBNI REA 3892/2013 5/12/2016 5/11/2046 1,092,730.52
  MOSSORO II MC 69 kV TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MOSSORO II MC 69 kV TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MOSSORO II MC 69 kV TR 230/69 kV MOSSORO II TR3 RN RBF FT TR 230/69 kV MOSSORO II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MOSSORO II MC 69 kV TR 230/69 kV MOSSORO II TR6 RN RBF FT TR 230/69 kV MOSSORO II TR6 RN 061/2001 IPCA RBNI REA 3892/2013 5/12/2016 5/11/2046 397,852.74
  MOSSORO II MC 69 kV TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,615.66
  MOSSORO II MC 69 kV TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 56,010.45
  MOSSORO II MC 69 kV TT 69/13,8 kV MOSSORO II TA1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 548,862.26
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 520,488.76
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,684,403.16
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBNI REA 2376/2010 23/10/2014 22/10/2042 50,478.39
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBNI REA 3892/2013 5/12/2016 5/11/2044 235,175.83
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RMEL REN 443/2011 21/01/2016 20/01/2033 28,048.56
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RMEL REN 443/2011 29/12/2016 28/12/2044 68,033.30
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RMEL REN 643/2014 30/08/2013 29/08/2030 23,123.17
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBNI REA 1814/2009 23/10/2014 22/10/2042 50,478.39
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RMEL REN 443/2011 5/12/2016 5/11/2030 1,451.44
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 353,089.34
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN 061/2001 IPCA RMEL REN 443/2011 5/12/2016 5/11/2030 1,451.44
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RMEL REN 443/2011 5/12/2016 5/11/2030 1,451.44
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 353,089.34
  MOSSORO II RTB 230 kV 20 Mvar MOSSORO II RT1 RN RB FT RTB 230 kV 20 Mvar MOSSORO II RT1 RN 061/2001 IPCA RBNI REA 3620/2012 26/05/2014 25/05/2047 568,453.87
  MOSSORO II TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MOSSORO II TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  MOSSORO II TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  MOSSORO II TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MOSSORO II TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  MOSSORO II TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  MOSSORO II TR 230/69 kV MOSSORO II TR3 RN RBF FT TR 230/69 kV MOSSORO II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MOSSORO II TR 230/69 kV MOSSORO II TR6 RN RBF FT TR 230/69 kV MOSSORO II TR6 RN 061/2001 IPCA RBNI REA 3892/2013 5/12/2016 5/11/2050 1,326,484.84
  MOSSORO II TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RMEL REN 443/2011 23/04/2015 22/04/2038 4,020.38
  MOSSORO II TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RMEL REN 443/2011 23/04/2015 22/04/2038 2,010.19
  MOSSORO II TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 86,181.95
  MOSSORO II TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 85,260.68
  MOSSORO II TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 266,486.21
  MOSSORO II TT 69/13,8 kV MOSSORO II TA1 RN DIT   061/2001 IPCA RCDM REA 3578/2012 7/10/2015 7/9/2045 192,445.47
  MOSSORO IV EL 230 kV MOSSORO IV LT 230 kV MOSSORO IV /MOSSORO II C-1 RN RB FT LT 230 kV MOSSORO IV /MOSSORO II C-1 RN 018/2012 IPCA RBL CC 018/2012 28/10/2017 6/1/2042 441,712.23
  MOSSORO IV IB 230 kV MG 230 kV MOSSORO IV MG1 RN IB1 RB FT MG 230 kV MOSSORO IV MG1 RN 018/2012 IPCA RBL CC 018/2012 28/10/2017 6/1/2042 273,021.07
  MOSSORO IV IB 69 kV MG 69 kV MOSSORO IV MG2 RN IB1 ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 6/1/2042 114,201.45
  MOSSORO IV MC 230 kV TR 230/69 kV MOSSORO IV TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 6/1/2042 422,377.27
  MOSSORO IV MC 69 kV TR 230/69 kV MOSSORO IV TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 6/1/2042 167,502.62
  MOSSORO IV MC 69 kV TT 69/230 kV MOSSORO IV TT1 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 6/1/2042 70,909.48
  MOSSORO IV MG 230 kV MOSSORO IV MG1 RN RB FT MG 230 kV MOSSORO IV MG1 RN 018/2012 IPCA RBL CC 018/2012 28/10/2017 6/1/2042 736,823.70
  MOSSORO IV MG 69 kV MOSSORO IV MG2 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 6/1/2042 485,079.53
  MOSSORO IV TR 230/69 kV MOSSORO IV TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 6/1/2042 1,068,580.59
  MOSSORO IV TT 69/230 kV MOSSORO IV TT1 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 6/1/2042 68,188.22
  MOXOTO EL 13,8 kV MOXOTO  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MOXOTO EL 13,8 kV MOXOTO  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MOXOTO EL 13,8 kV MOXOTO  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MOXOTO EL 13,8 kV MOXOTO  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MOXOTO EL 13,8 kV MOXOTO  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MOXOTO EL 13,8 kV MOXOTO  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MOXOTO EL 69 kV MOXOTO LT 69 kV ABAIXADORA /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MOXOTO EL 69 kV MOXOTO LT 69 kV ZEBU /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,904.70
  MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 124,724.00
  MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,904.70
  MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 124,724.00
  MOXOTO MC 69 kV TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,713.10
  MOXOTO MC 69 kV TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,615.66

 

80 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

  MOXOTO MG 69 kV MOXOTO MG1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 206,139.78
  MOXOTO MG 69 kV MOXOTO MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 203,936.18
  MOXOTO MG 69 kV MOXOTO MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 637,411.95
  MOXOTO MG 69 kV MOXOTO MG1 BA DIT   061/2001 IPCA RMEL REN 643/2014 28/02/2014 27/02/2031 14,466.84
  MOXOTO MG 69 kV MOXOTO MG1 BA DIT   061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 27,192.08
  MOXOTO TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  MOXOTO TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 24,344.47
  MOXOTO TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  MOXOTO TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 24,344.47
  MULUNGU EL 13,8 kV MULUNGU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MULUNGU EL 13,8 kV MULUNGU  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MULUNGU EL 13,8 kV MULUNGU  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MULUNGU EL 13,8 kV MULUNGU  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 44,630.13
  MULUNGU EL 13,8 kV MULUNGU  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MULUNGU EL 13,8 kV MULUNGU  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  MULUNGU EL 69 kV MULUNGU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 62,583.94
  MULUNGU EL 69 kV MULUNGU LT 69 kV ABAIXADORA /MULUNGU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 62,583.94
  MULUNGU MC 13,8 kV TR 69/13,8 kV MULUNGU TR1-A BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  MULUNGU MC 13,8 kV TR 69/13,8 kV MULUNGU TR1-A BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,904.70
  MULUNGU MC 13,8 kV TR 69/13,8 kV MULUNGU TR1-A BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 124,724.00
  MULUNGU MG 69 kV MULUNGU MG1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 188,800.42
  MULUNGU MG 69 kV MULUNGU MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 186,782.17
  MULUNGU MG 69 kV MULUNGU MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 583,796.32
  MULUNGU MG 69 kV MULUNGU MG1 BA DIT   061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 27,192.08
  MULUNGU TR 69/13,8 kV MULUNGU TR1-A BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  MULUNGU TR 69/13,8 kV MULUNGU TR1-B BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  MULUNGU TR 69/13,8 kV MULUNGU TR1-B BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 24,344.47
  MULUNGU TR 69/13,8 kV MULUNGU TR1-B BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 76,089.76
  MUSSURE II BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,350.06
  MUSSURE II BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 99,277.33
  MUSSURE II BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 310,295.90
  MUSSURE II BC 69 kV 21,3 Mvar MUSSURE II BC1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,662.17
  MUSSURE II BC 69 kV 21,3 Mvar MUSSURE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 99,586.10
  MUSSURE II EL 230 kV MUSSURE II LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB RB FT LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MUSSURE II EL 230 kV MUSSURE II LT 230 kV SANTA RITA II /MUSSURE II C-1 PB RB FT LT 230 kV SANTA RITA II /MUSSURE II C-1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  MUSSURE II EL 69 kV MUSSURE II  CRISTO-02J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MUSSURE II EL 69 kV MUSSURE II  ILHA BISTO-02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MUSSURE II EL 69 kV MUSSURE II  ILHA BISTO-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MUSSURE II EL 69 kV MUSSURE II  ILHA BISTO-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  MUSSURE II EL 69 kV MUSSURE II  J.PESSOA-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MUSSURE II EL 69 kV MUSSURE II  MANGABEIRA-02J8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MUSSURE II EL 69 kV MUSSURE II  MANGABEIRA-02J8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MUSSURE II EL 69 kV MUSSURE II  MANGABEIRA-02J8 DIT   061/2001 IPCA RCDM REA 2376/2010 26/03/2015 25/03/2045 11,382.67
  MUSSURE II EL 69 kV MUSSURE II  MUSSURE I-12J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MUSSURE II EL 69 kV MUSSURE II  MUSSURE I-12J6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  MUSSURE II EL 69 kV MUSSURE II  MUSSURE I-12J6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  MUSSURE II EL 69 kV MUSSURE II  SANTA RITA-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  MUSSURE II IB 230 kV MG 230 kV MUSSURE II MG1 PB IB1 RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  MUSSURE II IB 69 kV MG 230 kV MUSSURE II MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  MUSSURE II MC 230 kV TR 230/69 kV MUSSURE II TR1 PB RBF FT TR 230/69 kV MUSSURE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MUSSURE II MC 230 kV TR 230/69 kV MUSSURE II TR2 PB RBF FT TR 230/69 kV MUSSURE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MUSSURE II MC 230 kV TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MUSSURE II MC 230 kV TR 230/69 kV MUSSURE II TR4 PB RBF FT TR 230/69 kV MUSSURE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  MUSSURE II MC 230 kV TR 230/69 kV MUSSURE II TR4 PB RBF FT TR 230/69 kV MUSSURE II TR4 PB 061/2001 IPCA RMEL REN 443/2011 7/6/2017 7/5/2047 19,570.86
  MUSSURE II MC 69 kV BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  MUSSURE II MC 69 kV BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  MUSSURE II MC 69 kV BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  MUSSURE II MC 69 kV BC 69 kV 21,3 Mvar MUSSURE II BC1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  MUSSURE II MC 69 kV BC 69 kV 21,3 Mvar MUSSURE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  MUSSURE II MC 69 kV BC 69 kV 21,3 Mvar MUSSURE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  MUSSURE II MC 69 kV TR 230/69 kV MUSSURE II TR1 PB RBF FT TR 230/69 kV MUSSURE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MUSSURE II MC 69 kV TR 230/69 kV MUSSURE II TR2 PB RBF FT TR 230/69 kV MUSSURE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MUSSURE II MC 69 kV TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MUSSURE II MC 69 kV TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  MUSSURE II MC 69 kV TR 230/69 kV MUSSURE II TR4 PB RBF FT TR 230/69 kV MUSSURE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  MUSSURE II MC 69 kV TR 69/13,8 kV MUSSURE II TR5 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,531.97
  MUSSURE II MC 69 kV TR 69/13,8 kV MUSSURE II TR5 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 48,868.02
  MUSSURE II MC 69 kV TT 69/13,8 kV MUSSURE II TA1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 524,067.53
  MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 496,975.80
  MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,608,310.64
  MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 15/10/2015 14/10/2032 27,709.26
  MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 30/09/2015 29/09/2043 65,583.43
  MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 62,769.80
  MUSSURE II TR 230/69 kV MUSSURE II TR1 PB RBF FT TR 230/69 kV MUSSURE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MUSSURE II TR 230/69 kV MUSSURE II TR1 PB RBF FT TR 230/69 kV MUSSURE II TR1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  MUSSURE II TR 230/69 kV MUSSURE II TR2 PB RBF FT TR 230/69 kV MUSSURE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MUSSURE II TR 230/69 kV MUSSURE II TR2 PB RBF FT TR 230/69 kV MUSSURE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  MUSSURE II TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MUSSURE II TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  MUSSURE II TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  MUSSURE II TR 230/69 kV MUSSURE II TR4 PB RBF FT TR 230/69 kV MUSSURE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  MUSSURE II TR 69/13,8 kV MUSSURE II TR5 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  MUSSURE II TR 69/13,8 kV MUSSURE II TR5 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  MUSSURE II TR 69/13,8 kV MUSSURE II TR5 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  MUSSURE II TT 69/13,8 kV MUSSURE II TA1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  MUSSURE II TT 69/13,8 kV MUSSURE II TA2 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  N.S.SOCORRO EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /JARDIM C-1797 SE RB FT LT 230 kV N.S.SOCORRO /JARDIM C-1 SE 005/2012 IPCA RBL CC 005/2012 6/3/2020 5/10/2042 524,428.76
  N.S.SOCORRO EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /JARDIM C-2 SE RB FT LT 230 kV N.S.SOCORRO /JARDIM C-2 SE 005/2012 IPCA RBL CC 005/2012 6/3/2020 5/10/2042 524,428.76
  N.S.SOCORRO EL 69 kV N.S.SOCORRO  DIST1 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 5/10/2042 142,024.80
  N.S.SOCORRO EL 69 kV N.S.SOCORRO  DIST2 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 5/10/2042 142,024.80
  N.S.SOCORRO EL 69 kV N.S.SOCORRO  DIST3 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 5/10/2042 142,024.80
  N.S.SOCORRO EL 69 kV N.S.SOCORRO  DIST4 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 5/10/2042 142,024.80
  N.S.SOCORRO EL 69 kV N.S.SOCORRO  DIST5 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 5/10/2042 142,024.80
  N.S.SOCORRO EL 69 kV N.S.SOCORRO  DIST6 DIT   005/2012 IPCA RCDM REN 905/2020 7/5/2020 7/4/2047 302,220.02
  N.S.SOCORRO IB 230 kV MG 230 kV N.S.SOCORRO MG1 SE IB1 RB FT MG 230 kV N.S.SOCORRO MG1 SE 005/2012 IPCA RBL CC 005/2012 6/3/2020 5/10/2042 326,341.96
  N.S.SOCORRO IB 69 kV MG 230 kV N.S.SOCORRO MG1 SE IB1 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 5/10/2042 83,430.17
  N.S.SOCORRO MC 230 kV TR 230/69 kV N.S.SOCORRO TR1 SE RBF FT TR 230/69 kV N.S.SOCORRO TR1 SE 005/2012 IPCA RBL CC 005/2012 6/3/2020 5/10/2042 373,905.52
  N.S.SOCORRO MC 230 kV TR 230/69 kV N.S.SOCORRO TR2 SE RBF FT TR 230/69 kV N.S.SOCORRO TR2 SE 005/2012 IPCA RBL CC 005/2012 6/3/2020 5/10/2042 373,905.52
  N.S.SOCORRO MC 69 kV TR 230/69 kV N.S.SOCORRO TR1 SE RBF FT TR 230/69 kV N.S.SOCORRO TR1 SE 005/2012 IPCA RBL CC 005/2012 6/3/2020 5/10/2042 152,193.16
  N.S.SOCORRO MC 69 kV TR 230/69 kV N.S.SOCORRO TR2 SE RBF FT TR 230/69 kV N.S.SOCORRO TR2 SE 005/2012 IPCA RBL CC 005/2012 6/3/2020 5/10/2042 152,193.16
  N.S.SOCORRO MC 69 kV TT 69/0 kV N.S.SOCORRO TT1 SE DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 5/10/2042 51,281.23
  N.S.SOCORRO MG 230 kV N.S.SOCORRO MG1 SE RB FT MG 230 kV N.S.SOCORRO MG1 SE 005/2012 IPCA RBL CC 005/2012 6/3/2020 5/10/2042 1,127,448.02
  N.S.SOCORRO MG 230 kV N.S.SOCORRO MG1 SE RB FT MG 230 kV N.S.SOCORRO MG1 SE 005/2012 IPCA RBNI REN 905/2020 7/5/2020 7/4/2051 29,153.12
  N.S.SOCORRO TR 230/69 kV N.S.SOCORRO TR1 SE RBF FT TR 230/69 kV N.S.SOCORRO TR1 SE 005/2012 IPCA RBL CC 005/2012 6/3/2020 5/10/2042 1,178,510.38
  N.S.SOCORRO TR 230/69 kV N.S.SOCORRO TR2 SE RBF FT TR 230/69 kV N.S.SOCORRO TR2 SE 005/2012 IPCA RBL CC 005/2012 6/3/2020 5/10/2042 1,178,510.38
  N.S.SOCORRO TT 69/0 kV N.S.SOCORRO TT1 SE DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 5/10/2042 137,622.77
  NATAL II BC 69 kV 21,3 Mvar NATAL II BC1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,662.17
  NATAL II BC 69 kV 21,3 Mvar NATAL II BC2 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,662.17
  NATAL II BC 69 kV 21,3 Mvar NATAL II BC3 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,662.17

 

81 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  NATAL II BC 69 kV 21,3 Mvar NATAL II BC4 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,662.17
  NATAL II BC 69 kV 21,3 Mvar NATAL II BC4 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 99,586.10
  NATAL II CE 20/-0 Mvar NATAL II CE1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 480,170.51
  NATAL II CE 20/-0 Mvar NATAL II CE1 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 475,037.56
  NATAL II CE 20/-0 Mvar NATAL II CE1 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,484,751.87
  NATAL II CE 20/-0 Mvar NATAL II CE2 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 480,170.51
  NATAL II CE 20/-0 Mvar NATAL II CE2 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 475,037.56
  NATAL II CE 20/-0 Mvar NATAL II CE2 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,484,751.87
  NATAL II EL 13,8 kV NATAL II  AUXIL1 RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 45,840.82
  NATAL II EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  NATAL II EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  NATAL II EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  NATAL II EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-2 RN RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  NATAL II EL 230 kV NATAL II LT 230 kV PARAISO /NATAL II C-1 RN RB FT LT 230 kV PARAISO /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  NATAL II EL 230 kV NATAL II LT 230 kV PARAISO /NATAL II C-2 RN RB FT LT 230 kV PARAISO /NATAL II C-2 RN 061/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2048 45,121.40
  NATAL II EL 230 kV NATAL II LT 230 kV PARAISO /NATAL II C-2 RN RB FT LT 230 kV PARAISO /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  NATAL II EL 69 kV NATAL II  CENTRO-12J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  NATAL II EL 69 kV NATAL II  CENTRO-12J2 DIT   061/2001 IPCA RCDM REA 2040/2009 21/03/2014 20/03/2045 74,985.00
  NATAL II EL 69 kV NATAL II  IGAPO-02J4 DIT   061/2001 IPCA RCDM REA 2040/2009 27/01/2014 26/01/2045 74,676.70
  NATAL II EL 69 kV NATAL II  IGAPO-02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  NATAL II EL 69 kV NATAL II  IGAPO-02J5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  NATAL II EL 69 kV NATAL II  IGAPO-02J5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  NATAL II EL 69 kV NATAL II  IGAPO-02J5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  NATAL II EL 69 kV NATAL II  IGAPO-02J5 DIT   061/2001 IPCA RCDM REA 2040/2009 2/11/2014 2/10/2045 74,763.96
  NATAL II EL 69 kV NATAL II  IGAPO-02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  NATAL II EL 69 kV NATAL II  NATAL I-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  NATAL II EL 69 kV NATAL II  NEOPOLIS-02J9 DIT   061/2001 IPCA RCDM REA 2040/2009 21/03/2014 20/03/2045 74,985.00
  NATAL II EL 69 kV NATAL II  NEOPOLIS-02J9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  NATAL II EL 69 kV NATAL II  NEOPOLIS-02J9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  NATAL II EL 69 kV NATAL II  NEOPOLIS-02J9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  NATAL II EL 69 kV NATAL II  PARNAMIRIM-02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  NATAL II EL 69 kV NATAL II  PARNAMIRIM-02J6 DIT   061/2001 IPCA RCDM REA 2040/2009 21/03/2014 20/03/2045 74,985.00
  NATAL II EL 69 kV NATAL II  PARNAMIRIM-02J8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  NATAL II EL 69 kV NATAL II  PARNAMIRIM-02J8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  NATAL II EL 69 kV NATAL II  RIBEIRA-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  NATAL II EL 69 kV NATAL II  RIBEIRA-02J3 DIT   061/2001 IPCA RCDM REA 2040/2009 18/12/2013 17/12/2044 74,444.04
  NATAL II IB 230 kV MG 230 kV NATAL II MG1 RN IB1 RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  NATAL II IB 230 kV MG 230 kV NATAL II MG1 RN IB1 RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 100,801.10
  NATAL II IB 230 kV MG 230 kV NATAL II MG1 RN IB1 RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 326,212.02
  NATAL II IB 69 kV MG 230 kV NATAL II MG1 RN IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  NATAL II MC 230 kV RTB 230 kV 30 MVAr NATAL II RT1 RN RB FT RTB 230 kV 30 MVAr NATAL II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,896.88
  NATAL II MC 230 kV RTL 230 kV 9,9 MVAr NATAL II RT2 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  NATAL II MC 230 kV RTL 230 kV 9,9 MVAr NATAL II RT2 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 79,937.26
  NATAL II MC 230 kV RTL 230 kV 9,9 MVAr NATAL II RT3 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  NATAL II MC 230 kV RTL 230 kV 9,9 MVAr NATAL II RT3 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 79,937.26
  NATAL II MC 230 kV TR 230/69 kV NATAL II TR1 RN RBF FT TR 230/69 kV NATAL II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  NATAL II MC 230 kV TR 230/69 kV NATAL II TR2 RN RBF FT TR 230/69 kV NATAL II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  NATAL II MC 230 kV TR 230/69 kV NATAL II TR3 RN RBF FT TR 230/69 kV NATAL II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  NATAL II MC 230 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  NATAL II MC 230 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  NATAL II MC 230 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  NATAL II MC 230 kV TR 230/69 kV NATAL II TR8 RN RBF FT TR 230/69 kV NATAL II TR8 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 126,600.63
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC1 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC1 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC2 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC2 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC2 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC3 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC3 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC3 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC4 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC4 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC4 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  NATAL II MC 69 kV TR 230/69 kV NATAL II TR1 RN RBF FT TR 230/69 kV NATAL II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  NATAL II MC 69 kV TR 230/69 kV NATAL II TR2 RN RBF FT TR 230/69 kV NATAL II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  NATAL II MC 69 kV TR 230/69 kV NATAL II TR3 RN RBF FT TR 230/69 kV NATAL II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  NATAL II MC 69 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  NATAL II MC 69 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  NATAL II MC 69 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  NATAL II MC 69 kV TR 230/69 kV NATAL II TR8 RN RBF FT TR 230/69 kV NATAL II TR8 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  NATAL II MC 69 kV TR 69/3,3 kV NATAL II TR6 RN DIT   061/2001 IPCA RCDM REA 2376/2010 9/2/2013 9/1/2043 29,152.37
  NATAL II MC 69 kV TR 69/3,3 kV NATAL II TR6 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,713.10
  NATAL II MC 69 kV TR 69/3,3 kV NATAL II TR7 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,713.10
  NATAL II MC 69 kV TR 69/3,3 kV NATAL II TR7 RN DIT   061/2001 IPCA RCDM REA 2376/2010 22/08/2013 21/08/2043 29,126.64
  NATAL II MC 69 kV TT 69/13,8 kV NATAL II TA1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  NATAL II MC 69 kV TT 69/13,8 kV NATAL II TA2 RN DIT   061/2001 IPCA RMEL REN 443/2011 5/5/2016 5/4/2030 1,628.16
  NATAL II MC 69 kV TT 69/13,8 kV NATAL II TA2 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 634,426.19
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 601,629.46
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,946,990.30
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 443/2011 28/01/2016 27/01/2033 31,008.41
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 443/2011 5/5/2016 5/4/2030 1,628.16
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 443/2011 29/12/2016 28/12/2044 68,033.30
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 23,222.36
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 643/2014 30/04/2015 29/04/2043 44,200.87
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 181,239.15
  NATAL II RTB 230 kV 30 MVAr NATAL II RT1 RN RB FT RTB 230 kV 30 MVAr NATAL II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 331,874.23
  NATAL II RTL 230 kV 9,9 MVAr NATAL II RT2 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,646.95
  NATAL II RTL 230 kV 9,9 MVAr NATAL II RT2 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,962.63
  NATAL II RTL 230 kV 9,9 MVAr NATAL II RT3 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,646.95
  NATAL II RTL 230 kV 9,9 MVAr NATAL II RT3 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,962.63
  NATAL II RTL 230 kV 9,9 MVAr NATAL II RT3 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,182.57
  NATAL II TR 230/69 kV NATAL II TR1 RN RBF FT TR 230/69 kV NATAL II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  NATAL II TR 230/69 kV NATAL II TR1 RN RBF FT TR 230/69 kV NATAL II TR1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  NATAL II TR 230/69 kV NATAL II TR2 RN RBF FT TR 230/69 kV NATAL II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  NATAL II TR 230/69 kV NATAL II TR2 RN RBF FT TR 230/69 kV NATAL II TR2 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  NATAL II TR 230/69 kV NATAL II TR3 RN RBF FT TR 230/69 kV NATAL II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  NATAL II TR 230/69 kV NATAL II TR3 RN RBF FT TR 230/69 kV NATAL II TR3 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  NATAL II TR 230/69 kV NATAL II TR3 RN RBF FT TR 230/69 kV NATAL II TR3 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  NATAL II TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  NATAL II TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  NATAL II TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  NATAL II TR 230/69 kV NATAL II TR8 RN RBF FT TR 230/69 kV NATAL II TR8 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  NATAL II TR 69/13,8 kV NATAL II TR5 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  NATAL II TR 69/13,8 kV NATAL II TR5 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  NATAL II TR 69/13,8 kV NATAL II TR5 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  NATAL II TR 69/3,3 kV NATAL II TR6 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 86,181.95
  NATAL II TR 69/3,3 kV NATAL II TR6 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 85,260.68
  NATAL II TR 69/3,3 kV NATAL II TR6 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 266,486.21

 

82 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  NATAL II TR 69/3,3 kV NATAL II TR7 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 86,181.95
  NATAL II TR 69/3,3 kV NATAL II TR7 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 85,260.68
  NATAL II TR 69/3,3 kV NATAL II TR7 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 266,486.21
  NATAL II TT 69/13,8 kV NATAL II TA1 RN DIT   061/2001 IPCA RCDM REA 3578/2012 13/11/2015 11/12/2045 194,070.00
  NATAL II TT 69/13,8 kV NATAL II TA2 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  NATAL II TT 69/13,8 kV NATAL II TA2 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  NATAL II TT 69/13,8 kV NATAL II TA2 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  NATAL III EL 230 kV NATAL III LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBNI REA 3208/2011 1/6/2020 1/6/2049 581.82
  NATAL III EL 69 kV NATAL III  DIST1 DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 150,608.84
  NATAL III EL 69 kV NATAL III  DIST2 DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 150,608.84
  NATAL III EL 69 kV NATAL III  DIST3 DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 150,608.84
  NATAL III EL 69 kV NATAL III  DIST4 DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 150,608.84
  NATAL III IB 230 kV MG 230 kV NATAL III MG1 RN IB1 RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 419,975.44
  NATAL III IB 69 kV MG 230 kV NATAL III MG1 RN IB1 DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 99,999.63
  NATAL III MC 230 kV TR 230/69 kV NATAL III TR1 RN RBF FT TR 230/69 kV NATAL III TR1 RN 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 517,468.22
  NATAL III MC 230 kV TR 230/69 kV NATAL III TR2 RN RBF FT TR 230/69 kV NATAL III TR2 RN 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 517,468.22
  NATAL III MC 230 kV TR 230/69 kV NATAL III TR3 RN RBF FT TR 230/69 kV NATAL III TR3 RN 017/2009 IPCA RBNI REA 2823/2011 21/03/2018 21/03/2052 701,724.56
  NATAL III MC 69 kV TR 230/69 kV NATAL III TR1 RN RBF FT TR 230/69 kV NATAL III TR1 RN 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 186,913.90
  NATAL III MC 69 kV TR 230/69 kV NATAL III TR2 RN RBF FT TR 230/69 kV NATAL III TR2 RN 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 186,913.90
  NATAL III MC 69 kV TR 230/69 kV NATAL III TR3 RN RBF FT TR 230/69 kV NATAL III TR3 RN 017/2009 IPCA RBNI REA 2823/2011 21/03/2018 21/03/2052 301,866.14
  NATAL III MC 69 kV TT 69/0 kV NATAL III TT1 RN DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 75,629.76
  NATAL III MG 230 kV NATAL III MG1 RN RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 1,264,004.62
  NATAL III MG 230 kV NATAL III MG1 RN RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RMEL REN 643/2014 2/7/2014 2/6/2048 6,629.70
  NATAL III MG 230 kV NATAL III MG1 RN RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RMEL REN 643/2014 28/02/2015 27/02/2030 56,757.94
  NATAL III MG 230 kV NATAL III MG1 RN RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 26,398.01
  NATAL III MG 230 kV NATAL III MG1 RN RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RBNI REA 2823/2011 21/03/2018 21/03/2052 124,696.25
  NATAL III TR 230/69 kV NATAL III TR1 RN RBF FT TR 230/69 kV NATAL III TR1 RN 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 1,954,807.01
  NATAL III TR 230/69 kV NATAL III TR2 RN RBF FT TR 230/69 kV NATAL III TR2 RN 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 1,954,807.01
  NATAL III TR 230/69 kV NATAL III TR3 RN RBF FT TR 230/69 kV NATAL III TR3 RN 017/2009 IPCA RBNI REA 2823/2011 21/03/2018 21/03/2058 995,519.82
  NATAL III TT 69/0 kV NATAL III TT1 RN DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 65,936.46
  OLINDINA EL 13,8 kV OLINDINA  N.SOURE-01Y1 DIT   061/2001 IPCA RMEL REN 443/2011 1/12/2016 1/11/2046 4,321.39
  OLINDINA EL 13,8 kV OLINDINA  N.SOURE-01Y1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  OLINDINA EL 230 kV OLINDINA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-1 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS  /CATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 188,281.16
  OLINDINA EL 230 kV OLINDINA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-2 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS  /CATU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 188,281.16
  OLINDINA EL 500 kV OLINDINA LT 500 kV OLINDINA /CAMACARI II C-1 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  OLINDINA EL 500 kV OLINDINA LT 500 kV OLINDINA /CAMACARI II C-2 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-2 BA 061/2001 IPCA RMEL REN 643/2014 2/2/2014 2/1/2044 17,225.56
  OLINDINA EL 500 kV OLINDINA LT 500 kV OLINDINA /CAMACARI II C-2 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  OLINDINA EL 500 kV OLINDINA LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  OLINDINA EL 500 kV OLINDINA LT 500 kV P. AFONSO IV /OLINDINA C-1 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  OLINDINA IB 500 kV MG 500 kV OLINDINA MG1 BA IB1 RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  OLINDINA IB 500 kV MG 500 kV OLINDINA MG1 BA IB1 RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  OLINDINA IB 500 kV MG 500 kV OLINDINA MG1 BA IB2 RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  OLINDINA IB 500 kV MG 500 kV OLINDINA MG1 BA IB3 RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  OLINDINA MC 13,8 kV TR 13,8/0,46 kV OLINDINA TR2 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  OLINDINA MC 13,8 kV TR 13,8/0,46 kV OLINDINA TR3 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  OLINDINA MC 230 kV TR 230/13,8 kV OLINDINA TR1 BA RBF FT TR 230/13,8 kV OLINDINA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 126,600.63
  OLINDINA MC 500 kV RTL 500 kV 150 MVAr OLINDINA RT1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  OLINDINA MC 500 kV RTL 500 kV 150 MVAr OLINDINA RT2 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  OLINDINA MC 69 kV RTN 69 kV 0 Mvar OLINDINA RTN1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,600.99
  OLINDINA MC 69 kV RTN 69 kV 0 Mvar OLINDINA RTN2 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,600.99
  OLINDINA MG 500 kV OLINDINA MG1 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RMEL REN 643/2014 7/11/2013 7/10/2030 22,476.83
  OLINDINA MG 500 kV OLINDINA MG1 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RMEL REN 643/2014 13/09/2013 9/12/2030 24,540.04
  OLINDINA MG 500 kV OLINDINA MG1 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,234,443.02
  OLINDINA MG 500 kV OLINDINA MG1 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,170,628.35
  OLINDINA MG 500 kV OLINDINA MG1 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,788,381.72
  OLINDINA RTL 500 kV 150 MVAr OLINDINA RT1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,178.08
  OLINDINA RTL 500 kV 150 MVAr OLINDINA RT1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 673,465.34
  OLINDINA RTL 500 kV 150 MVAr OLINDINA RT1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,179,465.23
  OLINDINA RTL 500 kV 150 MVAr OLINDINA RT2 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,178.08
  OLINDINA RTL 500 kV 150 MVAr OLINDINA RT2 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 673,465.34
  OLINDINA RTL 500 kV 50 Mvar OLINDINA RTR1 BA RB FT RTL 500 kV 50 Mvar OLINDINA RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 236,726.03
  OLINDINA RTL 500 kV 50 Mvar OLINDINA RTR1 BA RB FT RTL 500 kV 50 Mvar OLINDINA RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 224,488.45
  OLINDINA RTN 69 kV 0 Mvar OLINDINA RTN1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,662.15
  OLINDINA RTN 69 kV 0 Mvar OLINDINA RTN2 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,662.15
  OLINDINA TR 230/13,8 kV OLINDINA TR1 BA RBF FT TR 230/13,8 kV OLINDINA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,494.87
  OUROLANDIA II EL 230 kV OUROLANDIA II LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBNI REA 9690/2021 6/4/2019 6/3/2047 131,990.95
  OUROLANDIA II EL 230 kV OUROLANDIA II LT 230 kV SE CAMPO FORMOSO /OUROLANDIA II C-1 BA RB FT LT 230 kV SE CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBNI REA 9690/2021 6/4/2019 6/3/2047 131,990.95
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /OLINDINA C-1 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBNI REA 5861/2016 9/6/2015 9/5/2043 23,825.05
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBNI REA 5861/2016 9/6/2015 9/5/2030 89,869.55
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBNI REA 5745/2016 1/10/2020 1/10/2049 1,191,089.46
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA DIT   061/2001 IPCA RCDM REA 5861/2016 9/6/2015 9/5/2030 89,869.55
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA DIT   061/2001 IPCA RCDM REA 5861/2016 9/6/2015 9/5/2043 23,825.05
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 424,110.01
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 424,110.01
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA DIT   061/2001 IPCA RCDM REA 5861/2016 9/6/2015 9/5/2043 23,825.05
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA DIT   061/2001 IPCA RCDM REA 5861/2016 9/6/2015 9/5/2030 89,869.55
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA DIT   061/2001 IPCA RCDM REA 5861/2016 9/6/2015 9/5/2043 23,825.05
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA DIT   061/2001 IPCA RCDM REA 5861/2016 9/6/2015 9/5/2030 89,869.55
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 424,110.01
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 424,110.01
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA DIT   061/2001 IPCA RCDM REA 5861/2016 9/6/2015 9/5/2030 89,869.55
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA DIT   061/2001 IPCA RCDM REA 5861/2016 9/6/2015 9/5/2043 23,825.05
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RCDM REA 5861/2016 9/6/2015 9/5/2043 23,825.05
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RCDM REA 5861/2016 9/6/2015 9/5/2030 89,869.55
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 424,110.01
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 424,110.01
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RCDM REA 5861/2016 9/6/2015 9/5/2043 23,825.05
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RCDM REA 5861/2016 9/6/2015 9/5/2030 89,869.55
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBNI REA 5861/2016 9/6/2015 9/5/2030 89,869.55
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBNI REA 5861/2016 9/6/2015 9/5/2043 23,825.05
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB1 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBNI REA 5745/2016 13/03/2019 13/03/2050 1,223,491.77
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB2 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB2 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RMEL REN 643/2014 2/7/2013 2/6/2043 14,534.56
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB3 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB3 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB4 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB5 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB5 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RMEL REN 643/2014 11/3/2013 11/2/2043 14,859.93
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB6 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB7 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB7 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RMEL REN 643/2014 15/02/2013 14/02/2043 14,544.23
  P. AFONSO IV MC 13,8 kV TR 18/13,8 kV P. AFONSO IV TR1 BA RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  P. AFONSO IV MC 13,8 kV TR 18/13,8 kV P. AFONSO IV TR2 BA RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR7 BA MC1 RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBNI REA 2040/2009 30/04/2015 29/04/2045 88,181.00
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR7 BA MC1 RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBNI REA 6137/2016 28/11/2019 28/11/2046 65,469.14
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR7 BA MC1 RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54

 

83 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR7 BA MC2 RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR7 BA MC2 RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBNI REA 2040/2009 25/01/2016 24/01/2046 82,613.71
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR8 BA MC1 RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBNI REA 2040/2009 25/01/2016 24/01/2046 82,613.71
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR8 BA MC1 RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR8 BA MC2 RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR8 BA MC2 RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBNI REA 6137/2016 6/5/2019 6/5/2046 65,469.14
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR8 BA MC2 RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBNI REA 2040/2009 25/01/2016 24/01/2046 90,036.98
  P. AFONSO IV MC 500 kV TR  500/230  kV P. AFONSO IV   TR7 BA RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  P. AFONSO IV MC 500 kV TR  500/230  kV P. AFONSO IV   TR8 BA RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBNI REA 6137/2016 27/05/2019 27/05/2041 463,736.52
  P. AFONSO IV MC 500 kV TR  500/230  kV P. AFONSO IV   TR8 BA RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  P. AFONSO IV MG 500 kV P. AFONSO IV MG1 BA RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,300,853.37
  P. AFONSO IV MG 500 kV P. AFONSO IV MG1 BA RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBNI REA 6137/2016 27/05/2019 27/05/2051 176,371.57
  P. AFONSO IV MG 500 kV P. AFONSO IV MG1 BA RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RMEL REN 443/2011 20/10/2016 19/10/2033 28,379.62
  P. AFONSO IV TR  500/230  kV P. AFONSO IV   TR7 BA RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  P. AFONSO IV TR  500/230  kV P. AFONSO IV   TR7 BA RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,624,997.02
  P. AFONSO IV TR  500/230  kV P. AFONSO IV   TR8 BA RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  P. AFONSO IV TR  500/230  kV P. AFONSO IV   TR8 BA RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,624,997.02
  P. AFONSO IV TR 500/230 kV P. AFONSO IV TRR1 BA RB FT TR 500/230 kV P. AFONSO IV TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 571,193.59
  P. AFONSO IV TR 500/230 kV P. AFONSO IV TRR1 BA RB FT TR 500/230 kV P. AFONSO IV TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 541,665.67
  P.AFONSO III EL 13,8 kV P.AFONSO III  AUXIL1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 45,840.82
  P.AFONSO III EL 13,8 kV P.AFONSO III  AUXIL2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 45,840.82
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ANGELIM C-1 AL/PE RB FT LT 230 kV P.AFONSO III /ANGELIM C-1 AL/PE 061/2001 IPCA RMEL REN 443/2011 9/11/2015 9/10/2045 12,262.13
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ANGELIM C-1 AL/PE RB FT LT 230 kV P.AFONSO III /ANGELIM C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBNI REA 6137/2016 1/3/2020 1/3/2046 65,469.14
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RMEL REN 443/2011 18/09/2017 17/09/2047 40,642.63
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBNI REA 4347/2013 14/04/2015 13/04/2045 16,161.97
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBNI REA 4347/2013 14/04/2015 13/04/2045 16,161.97
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RBNI REA 2376/2010 23/02/2015 22/02/2045 37,806.25
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RMEL REN 643/2014 22/02/2015 21/02/2043 35,629.80
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RMEL REN 643/2014 25/03/2015 24/03/2043 35,721.94
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RBNI REA 2837/2011 22/12/2014 21/12/2044 37,619.61
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /GARANHUNS II C-4 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-4 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /GARANHUNS II C-4 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-4 AL/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBNI REA 2823/2011 7/3/2020 7/3/2050 497,856.31
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBNI REA 6137/2016 25/11/2019 25/11/2046 65,469.14
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RMEL REN 443/2011 9/6/2017 9/5/2047 40,607.54
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBNI REA 4347/2013 16/03/2015 15/03/2045 32,250.77
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBNI REA 2823/2011 7/3/2020 7/3/2050 497,856.31
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /SE Floresta II C-2 AL/PE RB FT LT 230 kV P.AFONSO III /SE Floresta II C-2 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /SE Floresta II C-2 AL/PE RB FT LT 230 kV P.AFONSO III /SE Floresta II C-2 AL/PE 061/2001 IPCA RMEL REN 443/2011 25/01/2013 24/01/2043 12,898.91
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /SE Floresta II C-2 AL/PE RB FT LT 230 kV P.AFONSO III /SE Floresta II C-2 AL/PE 061/2001 IPCA RMEL REN 443/2011 25/01/2013 24/01/2043 12,898.91
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /SE Floresta II C-2 AL/PE RB FT LT 230 kV P.AFONSO III /SE Floresta II C-2 AL/PE 061/2001 IPCA RMEL REN 443/2011 25/01/2013 24/01/2043 12,898.91
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RBNI REA 6137/2016 1/3/2020 1/3/2046 65,469.14
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RMEL REN 443/2011 13/03/2015 3/12/2045 13,733.89
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2047 40,306.27
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 6/9/2017 6/8/2047 60,520.84
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 1/3/2020 1/3/2046 65,469.14
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 1/3/2020 1/3/2046 65,469.14
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 31/07/2017 30/07/2047 60,748.98
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 201,812.85
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-1 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-1 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 1/3/2020 1/3/2046 65,469.14
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 4/1/2016 31/03/2046 14,147.62
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 4/1/2016 31/03/2046 14,147.62
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 4/1/2016 31/03/2046 14,147.62
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 1/3/2020 1/3/2046 65,469.14
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 1/3/2020 1/3/2046 65,469.14
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 14/04/2016 13/04/2046 14,161.58
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 14/04/2016 13/04/2046 14,161.58
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 14/04/2016 13/04/2046 14,161.58
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-4 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 1/3/2020 1/3/2046 65,469.14
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-4 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ZEBU C-1 AL RB FT LT 230 kV P.AFONSO III /ZEBU C-1 AL 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 555,086.20
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ZEBU C-2 AL RB FT LT 230 kV P.AFONSO III /ZEBU C-2 AL/BA 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 555,086.20
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 201,812.85
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RMEL REN 643/2014 29/09/2013 28/09/2041 66,309.87
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL DIT   061/2001 IPCA RMEL REN 643/2014 17/01/2015 16/01/2043 35,522.79
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,993.51
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 201,812.85
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL BARRA1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 6137/2016 28/11/2019 28/11/2049 861,837.47
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL BARRA2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 6137/2016 28/11/2019 28/11/2049 861,837.47
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL BARRA3 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 6137/2016 28/11/2019 28/11/2049 861,837.47
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 2837/2011 23/12/2014 22/12/2044 37,622.57
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 374,783.88
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 374,783.88
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 2837/2011 2/9/2015 2/8/2045 37,764.77
  P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RMEL REN 443/2011 20/09/2016 19/09/2033 28,889.87
  P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RMEL REN 643/2014 17/07/2013 16/07/2030 22,982.40
  P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RMEL REN 643/2014 17/11/2015 16/11/2032 30,733.07
  P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 6137/2016 28/11/2019 28/11/2051 179,008.03
  P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 738,191.74
  P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 700,030.83
  P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,265,436.34
  PARAISO EL 138 kV PARAISO LT 138 kV PARAISO /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  PARAISO EL 138 kV PARAISO LT 138 kV PILOES /PARAISO C-1 PB/RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  PARAISO EL 230 kV PARAISO LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  PARAISO EL 230 kV PARAISO LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  PARAISO EL 230 kV PARAISO LT 230 kV PARAISO /ACU II C-2 RN RB FT LT 230 kV PARAISO /ACU II C-2 RN 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 412,952.82
  PARAISO EL 230 kV PARAISO LT 230 kV PARAISO /LAGOA NOVA II C-1 RN RB FT LT 230 kV PARAISO /LAGOA NOVA II C-2 RN 010/2011 IPCA RBL CC 010/2011 13/10/2011 13/10/2041 442,091.56
  PARAISO EL 230 kV PARAISO LT 230 kV PARAISO /NATAL II C-1 RN RB FT LT 230 kV PARAISO /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  PARAISO EL 230 kV PARAISO LT 230 kV PARAISO /NATAL II C-2 RN RB FT LT 230 kV PARAISO /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  PARAISO IB 138 kV MG 230 kV PARAISO MG1 RN IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,407.76

 

84 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  PARAISO IB 230 kV MG 230 kV PARAISO MG1 RN IB1 RB FT MG 230 kV PARAISO MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  PARAISO MC 138 kV TR 230/138 kV PARAISO TR1 RN RBF FT TR 230/138 kV PARAISO TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  PARAISO MC 138 kV TR 230/138 kV PARAISO TR2 RN RBF FT TR 230/138 kV PARAISO TR2 RN 061/2001 IPCA RBNI REA 3402/2012 12/5/2014 12/4/2044 797,595.57
  PARAISO MC 230 kV TR 230/138 kV PARAISO TR1 RN RBF FT TR 230/138 kV PARAISO TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  PARAISO MC 230 kV TR 230/138 kV PARAISO TR2 RN RBF FT TR 230/138 kV PARAISO TR2 RN 061/2001 IPCA RBNI REA 3402/2012 12/5/2014 12/4/2044 1,031,548.30
  PARAISO MG 230 kV PARAISO MG1 RN RB FT MG 230 kV PARAISO MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 456,754.44
  PARAISO MG 230 kV PARAISO MG1 RN RB FT MG 230 kV PARAISO MG1 RN 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2031 7,538.07
  PARAISO MG 230 kV PARAISO MG1 RN RB FT MG 230 kV PARAISO MG1 RN 061/2001 IPCA RMEL REN 443/2011 28/09/2016 27/09/2033 29,383.98
  PARAISO MG 230 kV PARAISO MG1 RN RB FT MG 230 kV PARAISO MG1 RN 061/2001 IPCA RMEL REN 643/2014 23/10/2015 22/10/2032 28,667.08
  PARAISO TR 230/138 kV PARAISO TR1 RN RBF FT TR 230/138 kV PARAISO TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,278.01
  PARAISO TR 230/138 kV PARAISO TR2 RN RBF FT TR 230/138 kV PARAISO TR2 RN 061/2001 IPCA RBNI REA 3402/2012 12/5/2014 12/4/2048 1,287,739.80
  PAU FERRO EL 230 kV PAU FERRO  FIAT 1 DIT   061/2001 IPCA RCDM REN 443/2011 11/8/2016 11/7/2046 1,243,335.43
  PAU FERRO EL 230 kV PAU FERRO  FIAT 2 DIT   061/2001 IPCA RCDM REN 443/2011 11/8/2016 11/7/2046 1,243,335.43
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV COTEMINAS /PAU FERRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /PAU FERRO C-1 PB/PE 061/2001 IPCA RMEL REN 443/2011 5/2/2017 5/1/2047 1,520.65
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV COTEMINAS /PAU FERRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /PAU FERRO C-1 PB/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RMEL REN 443/2011 22/03/2017 21/03/2047 1,525.21
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RMEL REN 643/2014 27/11/2014 26/11/2042 37,462.57
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBNI REA 3677/2012 20/05/2019 20/05/2044 642,561.79
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RMEL REN 443/2011 4/9/2017 4/8/2047 5,656.16
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBNI REA 3677/2012 20/05/2019 20/05/2044 642,561.79
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /SANTA RITA II C-2856 PE/PB RB FT LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB 017/2009 IPCA RBL CC 017/2009 30/01/2021 8/3/2039 637,752.50
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2047 5,668.64
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RMEL REN 443/2011 3/8/2017 3/7/2047 1,528.44
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RMEL REN 443/2011 3/6/2017 3/5/2047 5,672.01
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  PAU FERRO EL 69 kV PAU FERRO  MONJOPE 02N3 DIT   061/2001 IPCA RCDM REA 1814/2009 23/10/2013 22/10/2043 401,829.85
  PAU FERRO EL 69 kV PAU FERRO  MONJOPE 02N4 DIT   061/2001 IPCA RCDM REA 1814/2009 23/10/2013 22/10/2043 401,829.85
  PAU FERRO EL 69 kV PAU FERRO  PAU FERRO-02N5 DIT   061/2001 IPCA RCDM REA 2376/2010 19/09/2014 18/09/2044 54,846.40
  PAU FERRO EL 69 kV PAU FERRO  PAU FERRO-02N5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PAU FERRO EL 69 kV PAU FERRO  PAU FERRO-02N6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PAU FERRO EL 69 kV PAU FERRO  PAU FERRO-02N6 DIT   061/2001 IPCA RCDM REA 2376/2010 19/09/2014 18/09/2044 23,044.70
  PAU FERRO IB 230 kV MG 230 kV PAU FERRO MG1 PE IB1 RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  PAU FERRO IB 69 kV MG 230 kV PAU FERRO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR04 PE RBF FT TR 230/69 kV PAU FERRO TR04 PE 061/2001 IPCA RBNI REA 6108/2016 11/9/2018 11/9/2041 535,727.40
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR1 PE RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2047 11,316.59
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR1 PE RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RMEL REN 443/2011 3/6/2017 3/5/2047 5,657.05
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR1 PE RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR2 PE RBF FT TR 230/69 kV PAU FERRO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR2 PE RBF FT TR 230/69 kV PAU FERRO TR2 PE 061/2001 IPCA RMEL REN 443/2011 2/12/2017 2/11/2047 11,343.87
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR2 PE RBF FT TR 230/69 kV PAU FERRO TR2 PE 061/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2047 11,318.09
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR3 PE RBF FT TR 230/69 kV PAU FERRO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PAU FERRO MC 69 kV TR 230/69 kV PAU FERRO TR04 PE RBF FT TR 230/69 kV PAU FERRO TR04 PE 061/2001 IPCA RBNI REA 6108/2016 11/9/2018 11/9/2041 229,071.28
  PAU FERRO MC 69 kV TR 230/69 kV PAU FERRO TR1 PE RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PAU FERRO MC 69 kV TR 230/69 kV PAU FERRO TR1 PE RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RMEL REN 643/2014 4/6/2014 4/5/2044 11,483.04
  PAU FERRO MC 69 kV TR 230/69 kV PAU FERRO TR2 PE RBF FT TR 230/69 kV PAU FERRO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PAU FERRO MC 69 kV TR 230/69 kV PAU FERRO TR3 PE RBF FT TR 230/69 kV PAU FERRO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PAU FERRO MC 69 kV TT 69/0 kV PAU FERRO TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  PAU FERRO MC 69 kV TT 69/0 kV PAU FERRO TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REA 1814/2009 23/10/2013 22/10/2041 49,127.28
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REA 1814/2009 23/10/2013 22/10/2041 49,127.28
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REA 6108/2016 11/9/2018 11/9/2050 53,831.33
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REA 6108/2016 11/9/2018 11/9/2049 14,238.90
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 29,184.68
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REN 443/2011 11/8/2016 11/7/2044 176,571.76
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RMEL REN 443/2011 29/12/2016 28/12/2044 68,973.50
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REA 3677/2012 28/06/2019 28/06/2052 101,699.90
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 519,274.46
  PAU FERRO TR 230/69 kV PAU FERRO TR04 PE RBF FT TR 230/69 kV PAU FERRO TR04 PE 061/2001 IPCA RBNI REA 6108/2016 11/9/2018 11/9/2052 1,106,565.21
  PAU FERRO TR 230/69 kV PAU FERRO TR1 PE RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PAU FERRO TR 230/69 kV PAU FERRO TR2 PE RBF FT TR 230/69 kV PAU FERRO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PAU FERRO TR 230/69 kV PAU FERRO TR3 PE RBF FT TR 230/69 kV PAU FERRO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PAU FERRO TT 69/0 kV PAU FERRO TA1 PE DIT   061/2001 IPCA RCDM REA 6108/2016 11/9/2018 11/9/2048 246,699.83
  PAU FERRO TT 69/0 kV PAU FERRO TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  PECEM II IB 230 kV MG 500 kV PECEM II MG1 CE IB1 RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 401,993.43
  PECEM II IB 500 kV MG 500 kV PECEM II MG1 CE IB1 RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 1,053,123.49
  PECEM II IB 500 kV MG 500 kV PECEM II MG1 CE IB2 RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 1,053,123.49
  PECEM II IB 500 kV MG 500 kV PECEM II MG1 CE IB3 RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 1,053,123.49
  PECEM II IB 500 kV MG 500 kV PECEM II MG1 CE IB4 RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 1,053,123.49
  PECEM II MC 230 kV TR 500/230 kV PECEM II TR1 CE RB FT TR 500/230 kV PECEM II TR1 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 547,457.84
  PECEM II MC 230 kV TR 500/230 kV PECEM II TR2 CE RB FT TR 500/230 kV PECEM II TR2 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 547,457.84
  PECEM II MC 230 kV TR 500/230 kV PECEM II TR3 CE RB FT TR 500/230 kV PECEM II TR3 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 547,457.84
  PECEM II MC 500 kV TR 500/230 kV PECEM II TR1 CE RB FT TR 500/230 kV PECEM II TR1 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 1,058,132.39
  PECEM II MC 500 kV TR 500/230 kV PECEM II TR2 CE RB FT TR 500/230 kV PECEM II TR2 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 1,058,132.39
  PECEM II MC 500 kV TR 500/230 kV PECEM II TR3 CE RB FT TR 500/230 kV PECEM II TR3 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 1,058,132.39
  PECEM II MG 500 kV PECEM II MG1 CE RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 1,937,024.64
  PECEM II TR 500/230 kV PECEM II TR1 CE RB FT TR 500/230 kV PECEM II TR1 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 5,243,583.22
  PECEM II TR 500/230 kV PECEM II TR2 CE RB FT TR 500/230 kV PECEM II TR2 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 5,243,583.22
  PECEM II TR 500/230 kV PECEM II TR3 CE RB FT TR 500/230 kV PECEM II TR3 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 5,243,583.22
  PECEM II TR 500/230 kV PECEM II TRR1 CE RB FT TR 500/230 kV PECEM II TRR1 CE 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/11/2040 1,747,860.16
  PENEDO BC 230 kV 15 Mvar PENEDO BC1 AL RB FT BC 230 kV 15 Mvar PENEDO BC1 AL 061/2001 IPCA RBNI REA 2968/2011 23/11/2017 22/11/2041 317,127.46
  PENEDO BC 230 kV 15 Mvar PENEDO BC2 AL RB FT BC 230 kV 15 Mvar PENEDO BC2 AL 061/2001 IPCA RBNI REA 2968/2011 24/11/2017 23/11/2041 317,151.27
  PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RMEL REN 443/2011 28/10/2016 27/10/2046 1,872.23
  PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RMEL REN 643/2014 18/08/2015 17/08/2045 7,919.99
  PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RMEL REN 643/2014 11/10/2013 11/9/2041 49,616.20
  PENEDO EL 230 kV PENEDO LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL RB FT LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 317,685.90
  PENEDO EL 69 kV PENEDO  ARAPIRACA 02C6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PENEDO EL 69 kV PENEDO  ARAPIRACA 02C6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PENEDO EL 69 kV PENEDO  ARAPIRACA 02C6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PENEDO EL 69 kV PENEDO  ARAPIRACA 02C7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PENEDO EL 69 kV PENEDO  ARAPIRACA 02C7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PENEDO EL 69 kV PENEDO  ARAPIRACA 02C7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PENEDO EL 69 kV PENEDO  BOA CICA 02C4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PENEDO EL 69 kV PENEDO  BOA CICA 02C4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PENEDO EL 69 kV PENEDO  BOA CICA 02C4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PENEDO EL 69 kV PENEDO  CARAPICHO 02C1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PENEDO EL 69 kV PENEDO  CARAPICHO 02C1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PENEDO EL 69 kV PENEDO  CARAPICHO 02C1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PENEDO EL 69 kV PENEDO  CARAPICHO 02C2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PENEDO EL 69 kV PENEDO  MARITUBA 02C3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PENEDO EL 69 kV PENEDO  MARITUBA 02C3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PENEDO EL 69 kV PENEDO  MARITUBA 02C3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PENEDO EL 69 kV PENEDO  MARITUBA 02C5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PENEDO EL 69 kV PENEDO  MARITUBA 02C5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PENEDO EL 69 kV PENEDO  MARITUBA 02C5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71

 

85 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  PENEDO EL 69 kV PENEDO  PERIPERI 02C8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PENEDO EL 69 kV PENEDO  PERIPERI 02C8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PENEDO EL 69 kV PENEDO  PERIPERI 02C8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PENEDO IB 230 kV MG 230 kV PENEDO MG1 AL IB1 RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  PENEDO IB 230 kV MG 230 kV PENEDO MG1 AL IB1 RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RMEL REN 643/2014 18/08/2015 17/08/2045 8,204.12
  PENEDO IB 230 kV MG 230 kV PENEDO MG1 AL IB1 RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RMEL REN 443/2011 28/10/2016 27/10/2046 8,858.84
  PENEDO IB 69 kV MG 230 kV PENEDO MG1 AL IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  PENEDO IB 69 kV MG 230 kV PENEDO MG1 AL IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  PENEDO IB 69 kV MG 230 kV PENEDO MG1 AL IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  PENEDO MC 230 kV BC 230 kV 15 Mvar PENEDO BC1 AL RB FT BC 230 kV 15 Mvar PENEDO BC1 AL 061/2001 IPCA RBNI REA 2968/2011 23/11/2017 22/11/2047 1,116,623.00
  PENEDO MC 230 kV BC 230 kV 15 Mvar PENEDO BC1 AL RB FT BC 230 kV 15 Mvar PENEDO BC1 AL 061/2001 IPCA RBNI REA 5861/2016 19/02/2018 18/02/2033 39,277.49
  PENEDO MC 230 kV BC 230 kV 15 Mvar PENEDO BC2 AL RB FT BC 230 kV 15 Mvar PENEDO BC2 AL 061/2001 IPCA RBNI REA 5861/2016 19/02/2018 18/02/2033 39,277.49
  PENEDO MC 230 kV BC 230 kV 15 Mvar PENEDO BC2 AL RB FT BC 230 kV 15 Mvar PENEDO BC2 AL 061/2001 IPCA RBNI REA 2968/2011 24/11/2017 23/11/2047 1,116,692.51
  PENEDO MC 230 kV RTL 230 kV 10 Mvar PENEDO RT1 AL RB FT RTL 230 kV 10 Mvar PENEDO RT1 AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 270,102.71
  PENEDO MC 230 kV TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PENEDO MC 230 kV TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  PENEDO MC 230 kV TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  PENEDO MC 230 kV TR 230/69 kV PENEDO TR2 AL RBF FT TR 230/69 kV PENEDO TR2 AL 061/2001 IPCA RMEL REN 443/2011 28/10/2016 27/10/2046 874.71
  PENEDO MC 230 kV TR 230/69 kV PENEDO TR2 AL RBF FT TR 230/69 kV PENEDO TR2 AL 061/2001 IPCA RMEL REN 643/2014 18/08/2015 17/08/2045 24,612.37
  PENEDO MC 230 kV TR 230/69 kV PENEDO TR2 AL RBF FT TR 230/69 kV PENEDO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PENEDO MC 230 kV TR 230/69 kV PENEDO TR3 AL RBF FT TR 230/69 kV PENEDO TR3 AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 322,277.00
  PENEDO MC 69 kV TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PENEDO MC 69 kV TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  PENEDO MC 69 kV TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  PENEDO MC 69 kV TR 230/69 kV PENEDO TR2 AL RBF FT TR 230/69 kV PENEDO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PENEDO MC 69 kV TR 230/69 kV PENEDO TR3 AL RBF FT TR 230/69 kV PENEDO TR3 AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 83,173.87
  PENEDO MC 69 kV TT 69/0 kV PENEDO TA2 AL DIT   061/2001 IPCA RCDM REA 2460/2010 9/2/2012 9/1/2043 266,878.86
  PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RMEL REN 443/2011 2/2/2016 2/1/2033 28,090.09
  PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RMEL REN 643/2014 31/05/2015 30/05/2043 44,314.55
  PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 439,214.74
  PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 416,509.49
  PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,347,905.96
  PENEDO RTL 230 kV 10 Mvar PENEDO RT1 AL RB FT RTL 230 kV 10 Mvar PENEDO RT1 AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 76,401.78
  PENEDO TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PENEDO TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  PENEDO TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  PENEDO TR 230/69 kV PENEDO TR2 AL RBF FT TR 230/69 kV PENEDO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PENEDO TR 230/69 kV PENEDO TR3 AL RBF FT TR 230/69 kV PENEDO TR3 AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 570,754.24
  PENEDO TT 69/0 kV PENEDO TA2 AL DIT   061/2001 IPCA RCDM REA 2460/2010 9/2/2012 9/1/2042 247,851.35
  PENEDO TT 69/13,8 kV PENEDO TA1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  PENEDO TT 69/13,8 kV PENEDO TA1 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  PENEDO TT 69/13,8 kV PENEDO TA1 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RMEL REN 443/2011 4/10/2016 4/9/2046 14,157.29
  PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  PICI II IB 230 kV MG 230 kV PICI II MG1 CE IB1 RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  PICI II IB 230 kV MG 230 kV PICI II MG1 CE IB1 RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 100,801.10
  PICI II IB 230 kV MG 230 kV PICI II MG1 CE IB1 RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 326,212.02
  PICI II MC 230 kV TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PICI II MC 230 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PICI II MC 230 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  PICI II MC 230 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  PICI II MC 230 kV TR 230/69 kV PICI II TR3 CE RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PICI II MC 230 kV TR 230/69 kV PICI II TR3 CE RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  PICI II MC 230 kV TR 230/69 kV PICI II TR3 CE RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  PICI II MC 230 kV TR 230/69 kV PICI II TR4 CE RBF FT TR 230/69 kV PICI II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 17/02/2014 16/02/2044 966,926.02
  PICI II MC 230 kV TR 230/69 kV PICI II TR5 CE RBF FT TR 230/69 kV PICI II TR5 CE 061/2001 IPCA RBNI REA 6078/2016 21/10/2018 21/10/2041 576,536.01
  PICI II MC 230 kV TR 230/69 kV PICI II TR5 CE RBF FT TR 230/69 kV PICI II TR5 CE 061/2001 IPCA RBNI REA 6078/2016 21/10/2018 21/10/2041 246,481.17
  PICI II MC 69 kV TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PICI II MC 69 kV TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBNI REA 6078/2016 21/05/2017 20/05/2047 212,428.43
  PICI II MC 69 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,531.97
  PICI II MC 69 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 48,868.02
  PICI II MC 69 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 158,146.45
  PICI II MC 69 kV TR 230/69 kV PICI II TR3 CE RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,531.97
  PICI II MC 69 kV TR 230/69 kV PICI II TR3 CE RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 48,868.02
  PICI II MC 69 kV TR 230/69 kV PICI II TR3 CE RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 158,146.45
  PICI II MC 69 kV TR 230/69 kV PICI II TR4 CE RBF FT TR 230/69 kV PICI II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 17/02/2014 16/02/2044 376,876.69
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBNI REA 6078/2016 21/10/2018 21/10/2049 74,564.83
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBNI REA 6078/2016 5/5/2021 5/5/2038 77,835.17
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBNI REA 6078/2016 21/05/2017 20/05/2045 17,857.60
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RMEL REN 643/2014 29/01/2014 28/01/2031 23,609.48
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RMEL REN 443/2011 13/01/2016 1/12/2033 28,020.85
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 438,714.35
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 416,034.97
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,346,370.31
  PICI II TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PICI II TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBNI REA 6078/2016 21/05/2017 20/05/2048 119,442.20
  PICI II TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBNI REA 6078/2016 5/5/2021 5/5/2023 321,380.65
  PICI II TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PICI II TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  PICI II TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  PICI II TR 230/69 kV PICI II TR3 CE RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PICI II TR 230/69 kV PICI II TR4 CE RBF FT TR 230/69 kV PICI II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 17/02/2014 16/02/2048 1,263,212.84
  PICI II TR 230/69 kV PICI II TR5 CE RBF FT TR 230/69 kV PICI II TR5 CE 061/2001 IPCA RBNI REA 6078/2016 21/10/2018 21/10/2052 1,226,918.12
  PICOS BC 230 kV 15 Mvar PICOS BC3 PI RB FT BC 230 kV 15 Mvar PICOS BC3 PI 061/2001 IPCA RBNI REA 5166/2015 2/9/2018 2/8/2038 375,356.28
  PICOS BC 230 kV 17 Mvar PICOS BC1 PI RB FT BC 230 kV 15 Mvar PICOS BC1 PI 061/2001 IPCA RBNI REA 4602/2014 8/4/2017 8/3/2041 314,485.04
  PICOS BC 230 kV 17 Mvar PICOS BC2 PI RB FT BC 230 kV 15 Mvar PICOS BC2 PI 061/2001 IPCA RBNI REA 4602/2014 8/4/2017 8/3/2041 314,485.04
  PICOS EL 230 kV PICOS LT 230 kV PICOS /TAUA II C-1 PI/CE RB FT LT 230 kV PICOS /TAUA II C-1 PI/CE 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 412,952.82
  PICOS EL 230 kV PICOS LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  PICOS EL 230 kV PICOS LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  PICOS EL 230 kV PICOS LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  PICOS EL 230 kV PICOS LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  PICOS EL 69 kV PICOS  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PICOS EL 69 kV PICOS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PICOS EL 69 kV PICOS  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PICOS EL 69 kV PICOS  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PICOS EL 69 kV PICOS  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PICOS EL 69 kV PICOS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PICOS EL 69 kV PICOS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PICOS EL 69 kV PICOS  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PICOS IB 230 kV MG 230 kV PICOS MG1 PI IB1 RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  PICOS IB 230 kV MG 230 kV PICOS MG1 PI IB1 RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBNI REA 5166/2015 2/9/2018 2/8/2051 78,957.12
  PICOS IB 69 kV MG 230 kV PICOS MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  PICOS IB 69 kV MG 230 kV PICOS MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  PICOS IB 69 kV MG 230 kV PICOS MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  PICOS MC 230 kV BC 230 kV 15 Mvar PICOS BC3 PI RB FT BC 230 kV 15 Mvar PICOS BC3 PI 061/2001 IPCA RBNI REA 5166/2015 2/9/2018 2/8/2042 686,827.98

 

86 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  PICOS MC 230 kV BC 230 kV 17 Mvar PICOS BC1 PI RB FT BC 230 kV 15 Mvar PICOS BC1 PI 061/2001 IPCA RBNI REA 4602/2014 8/4/2017 8/3/2047 1,108,907.29
  PICOS MC 230 kV BC 230 kV 17 Mvar PICOS BC2 PI RB FT BC 230 kV 15 Mvar PICOS BC2 PI 061/2001 IPCA RBNI REA 4602/2014 8/4/2017 8/3/2047 1,108,907.29
  PICOS MC 230 kV RTB 230 kV 15 Mvar PICOS RT1 PI RB FT RTB 230 kV 15 Mvar PICOS RT1 PI 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 312,087.51
  PICOS MC 230 kV RTL 230 kV 15 Mvar PICOS RT2 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  PICOS MC 230 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PICOS MC 230 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  PICOS MC 230 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  PICOS MC 230 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBNI REA 5166/2015 3/6/2018 3/5/2036 256,553.31
  PICOS MC 230 kV TR 230/69 kV PICOS TR2 PI RBF FT TR 230/69 kV PICOS TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PICOS MC 230 kV TR 230/69 kV PICOS TR3 PI RBF FT TR 230/69 kV PICOS TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PICOS MC 230 kV TR 230/69 kV PICOS TR4 PI RBF FT TR 230/69 kV PICOS TR4 PI 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042 933,483.71
  PICOS MC 69 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PICOS MC 69 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  PICOS MC 69 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  PICOS MC 69 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBNI REA 5166/2015 3/6/2018 3/5/2033 89,245.63
  PICOS MC 69 kV TR 230/69 kV PICOS TR2 PI RBF FT TR 230/69 kV PICOS TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PICOS MC 69 kV TR 230/69 kV PICOS TR3 PI RBF FT TR 230/69 kV PICOS TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PICOS MC 69 kV TR 230/69 kV PICOS TR4 PI RBF FT TR 230/69 kV PICOS TR4 PI 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042 336,428.59
  PICOS MC 69 kV TT 69/13,8 kV PICOS TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBNI REA 5166/2015 2/9/2018 2/8/2050 63,386.25
  PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RMEL REN 443/2011 20/01/2016 19/01/2033 28,045.09
  PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBNI REA 4602/2014 8/4/2017 8/3/2045 188,221.12
  PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBNI REA 4602/2014 8/4/2017 8/3/2045 188,221.12
  PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 443,257.23
  PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 420,343.00
  PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,360,311.93
  PICOS RTB 230 kV 15 Mvar PICOS RT1 PI RB FT RTB 230 kV 15 Mvar PICOS RT1 PI 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 196,911.74
  PICOS RTL 230 kV 15 Mvar PICOS RT2 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 189,276.98
  PICOS TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBNI REA 5166/2015 3/6/2018 3/5/2053 1,204,468.06
  PICOS TR 230/69 kV PICOS TR2 PI RBF FT TR 230/69 kV PICOS TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 191,938.38
  PICOS TR 230/69 kV PICOS TR2 PI RBF FT TR 230/69 kV PICOS TR2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 182,016.10
  PICOS TR 230/69 kV PICOS TR2 PI RBF FT TR 230/69 kV PICOS TR2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 589,039.61
  PICOS TR 230/69 kV PICOS TR3 PI RBF FT TR 230/69 kV PICOS TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 226,840.77
  PICOS TR 230/69 kV PICOS TR4 PI RBF FT TR 230/69 kV PICOS TR4 PI 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2046 928,717.12
  PICOS TR 69/69 kV PICOS TREG1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,394.59
  PICOS TT 69/13,8 kV PICOS TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  PICOS TT 69/13,8 kV PICOS TA1 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  PILOES EL 138 kV PILOES LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RCDM REA 1094/2007 11/9/2012 11/8/2043 782,433.79
  PILOES EL 138 kV PILOES LT 138 kV PILOES /PARAISO C-1 PB/RN DIT   061/2001 IPCA RCDM REA 1094/2007 11/9/2012 11/8/2043 782,433.79
  PILOES IB 138 kV MG 138 kV PILOES MG1 PB IB1 DIT   061/2001 IPCA RCDM REA 1094/2007 11/9/2012 11/8/2043 627,877.90
  PILOES MC 138 kV MG 138 kV PILOES MG1 PB DIT   061/2001 IPCA RCDM REA 1094/2007 11/9/2012 11/8/2042 753,886.43
  PILOES MG 138 kV PILOES MG1 PB DIT   061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 28,015.63
  PILOES MG 138 kV PILOES MG1 PB DIT   061/2001 IPCA RCDM REA 1094/2007 11/9/2012 11/8/2039 1,217,496.96
  PINDAI II EL 230 kV PINDAI II LT 230 kV IGAPORA III /PINDAI II C-1 BA RB FT LT 230 kV IGAPORA III /PINDAI II C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 467,758.67
  PINDAI II EL 69 kV PINDAI II  DIST1 DIT   019/2012 IPCA RCDM REN 905/2020 1/12/2021 1/11/2048 302,220.02
  PINDAI II IB 230 kV MG 230 kV PINDAI II MG1 BA IB1 RB FT MG 230 kV PINDAI II MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 289,120.02
  PINDAI II IB 69 kV MG 69 kV PINDAI II MG1 BA IB1 ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 6/1/2042 88,447.18
  PINDAI II MC 230 kV TR 230/69 kV PINDAI II TR1 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 6/1/2042 325,560.07
  PINDAI II MC 230 kV TR 230/69 kV PINDAI II TR2 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 6/1/2042 325,560.07
  PINDAI II MC 69 kV TR 230/69 kV PINDAI II TR1 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 6/1/2042 129,727.11
  PINDAI II MC 69 kV TR 230/69 kV PINDAI II TR2 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 6/1/2042 129,727.11
  PINDAI II MC 69 kV TT 69/0 kV PINDAI II TT1 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 6/1/2042 54,918.40
  PINDAI II MG 230 kV PINDAI II MG1 BA RB FT MG 230 kV PINDAI II MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 6/1/2042 787,986.49
  PINDAI II MG 230 kV PINDAI II MG1 BA RB FT MG 230 kV PINDAI II MG1 BA 019/2012 IPCA RBNI REN 905/2020 1/12/2021 1/11/2052 29,153.12
  PINDAI II MG 69 kV PINDAI II MG1 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 6/1/2042 154,388.30
  PINDAI II TR 230/69 kV PINDAI II TR1 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 6/1/2042 990,991.29
  PINDAI II TR 230/69 kV PINDAI II TR2 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 6/1/2042 990,991.29
  PINDAI II TT 69/0 kV PINDAI II TT1 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 6/1/2042 52,226.39
  PIRAPAMA II BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,472.99
  PIRAPAMA II BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RCDM REA 5861/2016 6/9/2016 6/8/2044 19,814.29
  PIRAPAMA II EL 230 kV PIRAPAMA II  LANXES DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 192,089.95
  PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RMEL REN 443/2011 12/8/2017 12/7/2049 107,870.55
  PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV PIRAPAMA II /SUAPE II C-1 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 342,266.06
  PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV PIRAPAMA II /SUAPE II C-2 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 342,266.06
  PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RMEL REN 443/2011 18/11/2017 17/11/2049 107,725.76
  PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  PIRAPAMA II EL 69 kV PIRAPAMA II  AMBEV-02V2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRAPAMA II EL 69 kV PIRAPAMA II  AMBEV-02V2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PIRAPAMA II EL 69 kV PIRAPAMA II  AMBEV-02V2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PIRAPAMA II EL 69 kV PIRAPAMA II  AMBEV-02V2 DIT   061/2001 IPCA RMEL REN 443/2011 4/12/2016 4/11/2046 5,598.46
  PIRAPAMA II EL 69 kV PIRAPAMA II  AMBEV-02V2 DIT   061/2001 IPCA RMEL REN 643/2014 8/4/2015 8/3/2045 4,938.52
  PIRAPAMA II EL 69 kV PIRAPAMA II  AMBEV-02V2 DIT   061/2001 IPCA RMEL REN 643/2014 8/11/2015 8/10/2045 4,941.19
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RMEL REN 643/2014 8/10/2015 8/9/2045 4,940.81
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RMEL REN 643/2014 14/08/2015 13/08/2045 2,471.17
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RMEL REN 643/2014 14/09/2015 13/09/2045 2,463.80
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RMEL REN 443/2011 15/05/2015 14/05/2038 6,043.19
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RMEL REN 443/2011 4/12/2016 4/11/2046 1,869.88
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PIRAPAMA II EL 69 kV PIRAPAMA II  JUCARAL-02J5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRAPAMA II EL 69 kV PIRAPAMA II  JUCARAL-02J5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PIRAPAMA II EL 69 kV PIRAPAMA II  JUCARAL-02J5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PIRAPAMA II EL 69 kV PIRAPAMA II  JUCARAL-02J5 DIT   061/2001 IPCA RMEL REN 443/2011 4/12/2016 4/11/2046 2,358.73
  PIRAPAMA II EL 69 kV PIRAPAMA II  JUCARAL-02J5 DIT   061/2001 IPCA RMEL REN 643/2014 8/3/2015 8/2/2045 2,469.06
  PIRAPAMA II EL 69 kV PIRAPAMA II  JUCARAL-02J5 DIT   061/2001 IPCA RMEL REN 643/2014 14/08/2015 13/08/2045 2,471.17
  PIRAPAMA II EL 69 kV PIRAPAMA II  JUCARAL-02J5 DIT   061/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2045 2,464.35
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RCDM REA 1814/2009 4/5/2014 4/4/2045 16,655.37
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RMEL REN 443/2011 4/12/2016 4/11/2046 2,358.73
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RMEL REN 643/2014 14/08/2015 13/08/2045 2,471.17
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RMEL REN 643/2014 24/09/2015 23/09/2045 4,931.38
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RMEL REN 643/2014 29/03/2014 28/03/2044 21,503.47
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RMEL REN 443/2011 4/12/2016 4/11/2046 2,056.31
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RMEL REN 443/2011 4/12/2016 4/11/2046 2,056.31
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RMEL REN 643/2014 13/08/2015 8/12/2045 4,941.97
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RMEL REN 643/2014 24/09/2015 23/09/2045 4,931.38
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RMEL REN 643/2014 29/03/2014 28/03/2044 32,255.20
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RCDM REA 1814/2009 29/03/2014 28/03/2044 17,164.35
  PIRAPAMA II EL 69 kV PIRAPAMA II  PRAZERES-02V4 DIT   061/2001 IPCA RMEL REN 643/2014 8/10/2015 8/9/2045 4,940.81
  PIRAPAMA II EL 69 kV PIRAPAMA II  PRAZERES-02V4 DIT   061/2001 IPCA RMEL REN 643/2014 22/09/2015 21/09/2045 2,465.31
  PIRAPAMA II EL 69 kV PIRAPAMA II  PRAZERES-02V4 DIT   061/2001 IPCA RMEL REN 643/2014 22/09/2015 21/09/2045 2,465.31
  PIRAPAMA II EL 69 kV PIRAPAMA II  PRAZERES-02V4 DIT   061/2001 IPCA RMEL REN 443/2011 4/12/2016 4/11/2046 2,056.31
  PIRAPAMA II EL 69 kV PIRAPAMA II  PRAZERES-02V4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84

 

87 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  PIRAPAMA II EL 69 kV PIRAPAMA II  PRAZERES-02V4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PIRAPAMA II EL 69 kV PIRAPAMA II  PRAZERES-02V4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PIRAPAMA II EL 69 kV PIRAPAMA II  RECIFE-II-02V1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRAPAMA II EL 69 kV PIRAPAMA II  RECIFE-II-02V1 DIT   061/2001 IPCA RMEL REN 443/2011 4/12/2016 4/11/2046 4,107.03
  PIRAPAMA II EL 69 kV PIRAPAMA II  RECIFE-II-02V1 DIT   061/2001 IPCA RMEL REN 643/2014 13/08/2015 8/12/2045 4,941.97
  PIRAPAMA II EL 69 kV PIRAPAMA II  RECIFE-II-02V1 DIT   061/2001 IPCA RMEL REN 643/2014 22/09/2015 21/09/2045 4,930.62
  PIRAPAMA II EL 69 kV PIRAPAMA II  RHODIA-02J4 DIT   061/2001 IPCA RMEL REN 443/2011 4/12/2016 4/11/2046 2,242.74
  PIRAPAMA II EL 69 kV PIRAPAMA II  RHODIA-02J4 DIT   061/2001 IPCA RMEL REN 443/2011 30/09/2015 29/09/2038 6,122.42
  PIRAPAMA II EL 69 kV PIRAPAMA II  RHODIA-02J4 DIT   061/2001 IPCA RMEL REN 643/2014 8/12/2015 8/11/2045 4,941.58
  PIRAPAMA II EL 69 kV PIRAPAMA II  RHODIA-02J4 DIT   061/2001 IPCA RMEL REN 643/2014 14/09/2015 13/09/2045 2,463.80
  PIRAPAMA II EL 69 kV PIRAPAMA II  RHODIA-02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRAPAMA II EL 69 kV PIRAPAMA II  RHODIA-02J4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PIRAPAMA II EL 69 kV PIRAPAMA II  RHODIA-02J4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PIRAPAMA II EL 69 kV PIRAPAMA II  SIMISA-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRAPAMA II EL 69 kV PIRAPAMA II  SIMISA-02J1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PIRAPAMA II EL 69 kV PIRAPAMA II  SIMISA-02J1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PIRAPAMA II EL 69 kV PIRAPAMA II  SIMISA-02J1 DIT   061/2001 IPCA RMEL REN 443/2011 4/12/2016 4/11/2046 1,542.24
  PIRAPAMA II EL 69 kV PIRAPAMA II  SIMISA-02J1 DIT   061/2001 IPCA RMEL REN 643/2014 30/07/2015 29/07/2045 4,947.47
  PIRAPAMA II EL 69 kV PIRAPAMA II  SIMISA-02J1 DIT   061/2001 IPCA RMEL REN 643/2014 31/07/2015 30/07/2045 4,947.85
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02J7 DIT   061/2001 IPCA RMEL REN 443/2011 4/12/2016 4/11/2046 2,358.73
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02J7 DIT   061/2001 IPCA RMEL REN 643/2014 8/12/2015 8/11/2045 2,470.78
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02J7 DIT   061/2001 IPCA RMEL REN 643/2014 18/09/2015 17/09/2045 4,929.11
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02V3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02V3 DIT   061/2001 IPCA RMEL REN 643/2014 8/7/2015 8/6/2045 4,939.66
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02V3 DIT   061/2001 IPCA RMEL REN 643/2014 8/12/2015 8/11/2045 4,941.58
  PIRAPAMA II EL 69 kV PIRAPAMA II  TERMOCABO-02P1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRAPAMA II EL 69 kV PIRAPAMA II  TERMOCABO-02P1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PIRAPAMA II EL 69 kV PIRAPAMA II  TERMOCABO-02P1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PIRAPAMA II EL 69 kV PIRAPAMA II  W MARTINS-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRAPAMA II EL 69 kV PIRAPAMA II  W MARTINS-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PIRAPAMA II EL 69 kV PIRAPAMA II  W MARTINS-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PIRAPAMA II EL 69 kV PIRAPAMA II  W MARTINS-02J3 DIT   061/2001 IPCA RMEL REN 443/2011 4/12/2016 4/11/2046 2,358.73
  PIRAPAMA II EL 69 kV PIRAPAMA II  W MARTINS-02J3 DIT   061/2001 IPCA RMEL REN 643/2014 8/12/2015 8/11/2045 2,470.78
  PIRAPAMA II EL 69 kV PIRAPAMA II  W MARTINS-02J3 DIT   061/2001 IPCA RMEL REN 643/2014 23/09/2015 22/09/2045 4,931.00
  PIRAPAMA II IB 230 kV MG 230 kV PIRAPAMA II MG1 PE IB1 RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  PIRAPAMA II IB 230 kV MG 230 kV PIRAPAMA II MG1 PE IB1 RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 100,801.10
  PIRAPAMA II IB 69 kV MG 230 kV PIRAPAMA II MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RMEL REN 443/2011 5/5/2016 5/4/2046 14,184.15
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RMEL REN 443/2011 5/5/2016 5/4/2046 14,184.15
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RMEL REN 443/2011 5/5/2016 5/4/2046 14,184.15
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR4 PE RBF FT TR 230/69 kV PIRAPAMA II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RMEL REN 643/2014 29/07/2015 28/07/2045 2,473.54
  PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RMEL REN 443/2011 4/12/2016 4/11/2046 2,358.73
  PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RMEL REN 443/2011 4/12/2016 4/11/2046 1,682.05
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RMEL REN 643/2014 8/3/2015 8/2/2045 2,469.06
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2045 4,928.72
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RMEL REN 643/2014 15/09/2015 14/09/2045 2,463.98
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RMEL REN 643/2014 16/09/2015 15/09/2045 4,928.33
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RMEL REN 443/2011 4/12/2016 4/11/2046 4,198.84
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RMEL REN 643/2014 8/5/2014 8/4/2044 32,583.52
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR4 PE RBF FT TR 230/69 kV PIRAPAMA II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PIRAPAMA II MC 69 kV TR 69/13,8 kV PIRAPAMA II TRX PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,531.97
  PIRAPAMA II MC 69 kV TT 69/13,8 kV PIRAPAMA II TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  PIRAPAMA II MC 69 kV TT 69/13,8 kV PIRAPAMA II TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  PIRAPAMA II MG 230 kV PIRAPAMA II MG1 PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 541,238.25
  PIRAPAMA II MG 230 kV PIRAPAMA II MG1 PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 513,258.87
  PIRAPAMA II MG 230 kV PIRAPAMA II MG1 PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RMEL REN 643/2014 20/04/2015 19/04/2043 44,164.21
  PIRAPAMA II MG 230 kV PIRAPAMA II MG1 PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 28,817.16
  PIRAPAMA II TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PIRAPAMA II TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  PIRAPAMA II TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PIRAPAMA II TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  PIRAPAMA II TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PIRAPAMA II TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  PIRAPAMA II TR 230/69 kV PIRAPAMA II TR4 PE RBF FT TR 230/69 kV PIRAPAMA II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PIRAPAMA II TR 69/13,8 kV PIRAPAMA II TRX PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  PIRAPAMA II TT 69/13,8 kV PIRAPAMA II TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  PIRAPAMA II TT 69/13,8 kV PIRAPAMA II TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  PIRAPAMA II TT 69/13,8 kV PIRAPAMA II TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  PIRAPAMA II TT 69/13,8 kV PIRAPAMA II TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI 061/2001 IPCA RMEL REN 643/2014 5/5/2014 5/4/2028 41,374.16
  PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI 061/2001 IPCA RMEL REN 643/2014 5/6/2014 5/5/2028 41,380.34
  PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI 061/2001 IPCA RMEL REN 643/2014 5/7/2014 5/6/2028 41,386.50
  PIRIPIRI BC 230 kV 30 Mvar PIRIPIRI BC1 PI RB FT BC 230 kV 30 Mvar PIRIPIRI BC1 PI 061/2001 IPCA RBNI REA 5861/2016 5/3/2017 5/2/2045 33,915.43
  PIRIPIRI BC 230 kV 30 Mvar PIRIPIRI BC1 PI RB FT BC 230 kV 30 Mvar PIRIPIRI BC1 PI 061/2001 IPCA RBNI REA 2823/2011 29/04/2016 28/04/2040 333,991.96
  PIRIPIRI BC 230 kV 30 Mvar PIRIPIRI BC2 PI RB FT BC 230 kV 30 Mvar PIRIPIRI BC2 PI 061/2001 IPCA RBNI REA 3208/2011 12/4/2017 12/3/2041 349,575.56
  PIRIPIRI EL 13,8 kV PIRIPIRI  PIRACURUCA-01Y1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  PIRIPIRI EL 13,8 kV PIRIPIRI  PIRACURUCA-01Y1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 44,630.13
  PIRIPIRI EL 13,8 kV PIRIPIRI  PIRACURUCA-01Y1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 139,493.55
  PIRIPIRI EL 13,8 kV PIRIPIRI  PIRIPIRI-01Y2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  PIRIPIRI EL 13,8 kV PIRIPIRI  PIRIPIRI-01Y2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 44,630.13
  PIRIPIRI EL 13,8 kV PIRIPIRI  PIRIPIRI-01Y2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 139,493.55
  PIRIPIRI EL 13,8 kV PIRIPIRI  SETE CIDAD-01Y3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  PIRIPIRI EL 13,8 kV PIRIPIRI  SETE CIDAD-01Y3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 44,630.13
  PIRIPIRI EL 13,8 kV PIRIPIRI  SETE CIDAD-01Y3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 139,493.55
  PIRIPIRI EL 138 kV PIRIPIRI  TABULEIRO 03C2 DIT   061/2001 IPCA RCDM REA 2040/2009 26/08/2013 25/08/2043 811,058.16
  PIRIPIRI EL 138 kV PIRIPIRI  TABULEIRO-03C1 DIT   061/2001 IPCA RCDM REA 7761/2019 31/12/2019 30/12/2034 38,654.54
  PIRIPIRI EL 138 kV PIRIPIRI  TABULEIRO-03C1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  PIRIPIRI EL 138 kV PIRIPIRI  TABULEIRO-03C1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 149,707.89
  PIRIPIRI EL 138 kV PIRIPIRI  TABULEIRO-03C1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 467,918.95

 

88 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  PIRIPIRI EL 230 kV PIRIPIRI LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE RB FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  PIRIPIRI EL 230 kV PIRIPIRI LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  PIRIPIRI EL 230 kV PIRIPIRI LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  PIRIPIRI EL 230 kV PIRIPIRI LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  PIRIPIRI EL 69 kV PIRIPIRI  C.MAIOR-02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRIPIRI EL 69 kV PIRIPIRI  ESPERANTIN-02J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRIPIRI EL 69 kV PIRIPIRI  ESPERANTIN-02J2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PIRIPIRI EL 69 kV PIRIPIRI  ESPERANTIN-02J5 DIT   061/2001 IPCA RCDM REA 1814/2009 29/05/2015 28/05/2045 417,909.21
  PIRIPIRI EL 69 kV PIRIPIRI  PEDRO II-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRIPIRI EL 69 kV PIRIPIRI  PEDRO II-02J1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PIRIPIRI EL 69 kV PIRIPIRI  PEDRO II-02J1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PIRIPIRI EL 69 kV PIRIPIRI  PIRACURUCA-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PIRIPIRI EL 69 kV PIRIPIRI  PIRACURUCA-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PIRIPIRI EL 69 kV PIRIPIRI  PIRACURUCA-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PIRIPIRI IB 138 kV MG 230 kV PIRIPIRI MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,407.76
  PIRIPIRI IB 230 kV MG 230 kV PIRIPIRI MG1 PI IB1 RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBNI REA 2823/2011 13/03/2015 3/12/2046 289,705.23
  PIRIPIRI IB 69 kV MG 230 kV PIRIPIRI MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI 061/2001 IPCA RMEL REN 443/2011 19/05/2016 18/05/2046 5,995.37
  PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI 061/2001 IPCA RMEL REN 443/2011 19/05/2016 18/05/2046 5,995.37
  PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI 061/2001 IPCA RMEL REN 443/2011 19/05/2016 18/05/2046 5,995.37
  PIRIPIRI MC 13,8 kV RTB 13,8 kV 5 Mvar PIRIPIRI RT1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,442.50
  PIRIPIRI MC 13,8 kV RTB 13,8 kV 5 Mvar PIRIPIRI RT1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,473.00
  PIRIPIRI MC 13,8 kV RTB 13,8 kV 5 Mvar PIRIPIRI RT1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,285.27
  PIRIPIRI MC 138 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  PIRIPIRI MC 138 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 97,793.89
  PIRIPIRI MC 138 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 316,480.09
  PIRIPIRI MC 138 kV TR 230/138 kV PIRIPIRI TR5 PI RBF FT TR 230/138 kV PIRIPIRI TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  PIRIPIRI MC 138 kV TR 230/138 kV PIRIPIRI TR7 PI RBF FT TR 230/138 kV PIRIPIRI TR7 PI 061/2001 IPCA RBNI REA 2823/2011 17/11/2014 16/11/2044 829,695.51
  PIRIPIRI MC 230 kV BC 230 kV 30 Mvar PIRIPIRI BC1 PI RB FT BC 230 kV 30 Mvar PIRIPIRI BC1 PI 061/2001 IPCA RBNI REA 2823/2011 29/04/2016 28/04/2047 989,723.47
  PIRIPIRI MC 230 kV BC 230 kV 30 Mvar PIRIPIRI BC2 PI RB FT BC 230 kV 30 Mvar PIRIPIRI BC2 PI 061/2001 IPCA RBNI REA 3208/2011 12/4/2017 12/3/2047 1,116,337.20
  PIRIPIRI MC 230 kV RTL 230 kV 10 MVAr PIRIPIRI RT1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  PIRIPIRI MC 230 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PIRIPIRI MC 230 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  PIRIPIRI MC 230 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  PIRIPIRI MC 230 kV TR 230/138 kV PIRIPIRI TR5 PI RBF FT TR 230/138 kV PIRIPIRI TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PIRIPIRI MC 230 kV TR 230/138 kV PIRIPIRI TR7 PI RBF FT TR 230/138 kV PIRIPIRI TR7 PI 061/2001 IPCA RBNI REA 2823/2011 17/11/2014 16/11/2044 1,039,820.61
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBNI REA 2823/2011 12/1/2015 30/11/2045 683,691.44
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR2 PI RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RMEL REN 443/2011 9/1/2015 31/08/2038 6,411.36
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR2 PI RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RMEL REN 443/2011 9/1/2015 31/08/2038 6,411.36
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR2 PI RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RBNI REA 2823/2011 24/09/2015 23/09/2043 194,419.29
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR2 PI RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR3 PI RBF FT TR 230/69 kV PIRIPIRI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR3 PI RBF FT TR 230/69 kV PIRIPIRI TR3 PI 061/2001 IPCA RMEL REN 443/2011 16/03/2016 15/03/2049 101,895.13
  PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBNI REA 2823/2011 12/1/2015 30/11/2045 269,384.70
  PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR2 PI RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RBNI REA 2823/2011 24/09/2015 23/09/2045 268,177.26
  PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR2 PI RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR3 PI RBF FT TR 230/69 kV PIRIPIRI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PIRIPIRI MC 69 kV TR 69/69 kV PIRIPIRI TR6A PI TR6A/TR6C DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,615.66
  PIRIPIRI MC 69 kV TT 69/0 kV PIRIPIRI TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  PIRIPIRI MC 69 kV TT 69/0 kV PIRIPIRI TA2 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RMEL REN 643/2014 30/10/2013 29/10/2041 71,220.29
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RMEL REN 643/2014 10/8/2014 10/7/2044 50,923.75
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RMEL REN 443/2011 26/01/2016 25/01/2033 28,065.86
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBNI REA 2040/2009 26/08/2013 25/08/2041 108,702.40
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBNI REA 1814/2009 29/05/2015 28/05/2043 51,285.36
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBNI REA 2823/2011 17/11/2014 16/11/2042 175,811.46
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBNI REA 2823/2011 29/04/2016 28/04/2044 182,435.79
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 604,189.43
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 572,955.79
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,854,196.72
  PIRIPIRI RTB 13,8 kV 5 Mvar PIRIPIRI RT1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  PIRIPIRI RTL 230 kV 10 MVAr PIRIPIRI RT1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  PIRIPIRI RTL 230 kV 3,33 Mvar PIRIPIRI RTR1 PI RB FT RTL 230 kV 3,33 Mvar PIRIPIRI RTR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,047.53
  PIRIPIRI RTS 13,8 kV 0 Mvar PIRIPIRI RTS1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  PIRIPIRI TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 251,877.35
  PIRIPIRI TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 238,856.53
  PIRIPIRI TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 772,986.32
  PIRIPIRI TR 230/138 kV PIRIPIRI TR5 PI RBF FT TR 230/138 kV PIRIPIRI TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 251,877.35
  PIRIPIRI TR 230/138 kV PIRIPIRI TR7 PI RBF FT TR 230/138 kV PIRIPIRI TR7 PI 061/2001 IPCA RBNI REA 2823/2011 17/11/2014 16/11/2048 1,018,128.99
  PIRIPIRI TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBNI REA 2823/2011 12/1/2015 30/11/2049 1,135,757.44
  PIRIPIRI TR 230/69 kV PIRIPIRI TR2 PI RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RBNI REA 2823/2011 24/09/2015 23/09/2049 1,131,181.64
  PIRIPIRI TR 230/69 kV PIRIPIRI TR3 PI RBF FT TR 230/69 kV PIRIPIRI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 226,840.77
  PIRIPIRI TR 69/13,8 kV PIRIPIRI TR6B PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  PIRIPIRI TR 69/13,8 kV PIRIPIRI TR6C PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  PIRIPIRI TR 69/69 kV PIRIPIRI TR6A PI DIT   061/2001 IPCA RCDM REA 6233/2017 7/12/2019 7/12/2048 198,805.16
  PIRIPIRI TT 69/0 kV PIRIPIRI TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  PIRIPIRI TT 69/0 kV PIRIPIRI TA2 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  PITUACU BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,350.06
  PITUACU BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 99,277.33
  PITUACU BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 310,295.90
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI II /PITUACU C-2 BA RB FT LT 230 kV CAMACARI II /PITUACU C-2 BA 061/2001 IPCA RBNI REA 5861/2016 1/12/2018 1/11/2033 105,761.32
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI II /PITUACU C-2 BA RB FT LT 230 kV CAMACARI II /PITUACU C-2 BA 061/2001 IPCA RBNI REA 2040/2009 6/9/2014 6/8/2044 38,630.40
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI II /PITUACU C-2 BA RB FT LT 230 kV CAMACARI II /PITUACU C-2 BA 061/2001 IPCA RBNI REA 2040/2009 30/11/2017 29/11/2047 40,576.45
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI II /PITUACU C-2 BA RB FT LT 230 kV CAMACARI II /PITUACU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2891/2011 5/5/2014 5/4/2040 78,145.51
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2040/2009 16/05/2014 15/05/2045 197,601.66
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RMEL REN 643/2014 19/01/2014 18/01/2044 55,093.62
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /NARANDIBA C-1 BA RB FT LT 230 kV PITUACU /NARANDIBA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /NARANDIBA C-2 BA RB FT LT 230 kV PITUACU /NARANDIBA C-2 BA 061/2001 IPCA RMEL REN 443/2011 17/10/2015 16/10/2045 12,980.01
  PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /NARANDIBA C-2 BA RB FT LT 230 kV PITUACU /NARANDIBA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /RL (COTEGIPE / MATATU) C-1 BA/PE RB FT LT 230 kV PITUACU /RL (COTEGIPE/MATATU) C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /RL (COTEGIPE / MATATU) C-1 BA/PE RB FT LT 230 kV PITUACU /RL (COTEGIPE/MATATU) C-1 BA/PE 061/2001 IPCA RMEL REN 643/2014 2/2/2014 2/1/2044 55,155.05
  PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /RL (COTEGIPE / MATATU) C-1 BA/PE RB FT LT 230 kV PITUACU /RL (COTEGIPE/MATATU) C-1 BA/PE 061/2001 IPCA RBNI REA 5861/2016 1/12/2018 1/11/2033 36,915.31
  PITUACU EL 69 kV PITUACU  CAB 02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PITUACU EL 69 kV PITUACU  CAB 02J1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PITUACU EL 69 kV PITUACU  CAJAZ 02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PITUACU EL 69 kV PITUACU  CAJAZ 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PITUACU EL 69 kV PITUACU  CAJAZ 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PITUACU EL 69 kV PITUACU  CAJAZ 02J3 DIT   061/2001 IPCA RCDM REA 2837/2011 29/11/2017 28/11/2047 32,774.88
  PITUACU EL 69 kV PITUACU  CAJAZ 02J3 DIT   061/2001 IPCA RCDM REA 2837/2011 29/11/2017 28/11/2047 19,477.93

 

89 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  PITUACU EL 69 kV PITUACU  CAJAZ 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PITUACU EL 69 kV PITUACU  CAJAZ 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PITUACU EL 69 kV PITUACU  CAJAZ 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PITUACU EL 69 kV PITUACU  LFREIT/COTEGIPE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PITUACU EL 69 kV PITUACU  LFREIT/COTEGIPE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PITUACU EL 69 kV PITUACU  LFREIT/COTEGIPE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PITUACU EL 69 kV PITUACU  LFREIT/COTEGIPE DIT   061/2001 IPCA RCDM REA 2837/2011 23/10/2016 22/10/2046 31,834.76
  PITUACU EL 69 kV PITUACU  MATATU 02J5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PITUACU EL 69 kV PITUACU  MATATU 02J5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PITUACU EL 69 kV PITUACU  MATATU 02J5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PITUACU EL 69 kV PITUACU  PITUACU 02V1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PITUACU EL 69 kV PITUACU  PITUACU 02V1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PITUACU EL 69 kV PITUACU  PITUACU 02V1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PITUACU EL 69 kV PITUACU  PITUACU 02V1 DIT   061/2001 IPCA RCDM REA 2837/2011 20/03/2017 19/03/2047 32,180.88
  PITUACU EL 69 kV PITUACU  PITUACU 02V1 DIT   061/2001 IPCA RCDM REA 2837/2011 19/03/2017 18/03/2047 32,192.60
  PITUACU EL 69 kV PITUACU  PITUACU 02V1 DIT   061/2001 IPCA RCDM REA 2376/2010 4/12/2014 4/11/2045 27,326.08
  PITUACU EL 69 kV PITUACU  PITUBA 02J6 DIT   061/2001 IPCA RCDM REA 2837/2011 8/2/2015 8/1/2045 30,787.06
  PITUACU EL 69 kV PITUACU  PITUBA 02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PITUACU EL 69 kV PITUACU  PITUBA 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PITUACU EL 69 kV PITUACU  PITUBA 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PITUACU EL 69 kV PITUACU  PITUBA 02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PITUACU EL 69 kV PITUACU  PITUBA 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PITUACU EL 69 kV PITUACU  PITUBA 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PITUACU EL 69 kV PITUACU  PITUBA 02J7 DIT   061/2001 IPCA RCDM REA 2837/2011 29/11/2017 28/11/2047 32,774.88
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J8 DIT   061/2001 IPCA RCDM REA 2837/2011 2/8/2017 2/7/2047 32,087.33
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J8 DIT   061/2001 IPCA RCDM REA 2837/2011 2/8/2017 2/7/2047 32,116.92
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J9 DIT   061/2001 IPCA RCDM REA 2376/2010 4/5/2014 4/4/2044 7,636.11
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J9 DIT   061/2001 IPCA RCDM REA 2837/2011 10/12/2016 10/11/2046 31,885.98
  PITUACU IB 230 kV MG 230 kV PITUACU MG1 BA IB1 RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  PITUACU IB 69 kV MG 230 kV PITUACU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  PITUACU IB 69 kV MG 230 kV PITUACU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  PITUACU IB 69 kV MG 230 kV PITUACU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RMEL REN 443/2011 4/3/2016 4/2/2046 14,149.77
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044 55,247.18
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RMEL REN 443/2011 4/3/2016 4/2/2046 14,149.77
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  PITUACU MC 69 kV BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  PITUACU MC 69 kV BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  PITUACU MC 69 kV BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  PITUACU MC 69 kV TT 69/13,8 kV PITUACU TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  PITUACU MC 69 kV TT 69/13,8 kV PITUACU TA2 BA DIT   061/2001 IPCA RCDM REA 2412/2010 8/12/2012 8/11/2043 266,488.84
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 549,573.41
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 521,163.15
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,686,585.61
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 443/2011 6/12/2016 6/11/2046 7,528.08
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 443/2011 6/12/2016 6/11/2046 7,528.08
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 443/2011 6/12/2016 6/11/2046 7,528.08
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 28,817.16
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 643/2014 27/08/2013 26/08/2030 23,113.57
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/04/2015 29/04/2043 44,200.87
  PITUACU TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PITUACU TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  PITUACU TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  PITUACU TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PITUACU TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  PITUACU TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  PITUACU TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PITUACU TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  PITUACU TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  PITUACU TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  PITUACU TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  PITUACU TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  PITUACU TR 69/13,8 kV PITUACU TR1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  PITUACU TR 69/13,8 kV PITUACU TR1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  PITUACU TR 69/13,8 kV PITUACU TR1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  PITUACU TT 69/13,8 kV PITUACU TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  PITUACU TT 69/13,8 kV PITUACU TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  PITUACU TT 69/13,8 kV PITUACU TA2 BA DIT   061/2001 IPCA RCDM REA 2412/2010 8/12/2012 8/11/2042 247,475.17
  POCOES II EL 138 kV POCOES II  DIST1 DIT   005/2012 IPCA RPEC CC 005/2012 28/10/2019 5/10/2042 326,585.43
  POCOES II EL 138 kV POCOES II  DIST2 DIT   005/2012 IPCA RPEC CC 005/2012 28/10/2019 5/10/2042 326,585.43
  POCOES II EL 138 kV POCOES II  DIST3 DIT   005/2012 IPCA RPEC CC 005/2012 28/10/2019 5/10/2042 326,585.43
  POCOES II IB 138 kV MG 230 kV POCOES II MG1 BA IB1 DIT   005/2012 IPCA RPEC CC 005/2012 28/10/2019 5/10/2042 189,919.85
  POCOES II IB 230 kV MG 230 kV POCOES II MG1 BA IB1 RB FT MG 230 kV POCOES II MG1 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 5/10/2042 321,513.07
  POCOES II MC 138 kV TR 230/138 kV POCOES II TR1 BA RBF FT TR 230/138 kV POCOES II TR1 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 5/10/2042 278,841.94
  POCOES II MC 138 kV TR 230/138 kV POCOES II TR2 BA RBF FT TR 230/138 kV POCOES II TR2 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 5/10/2042 278,841.94
  POCOES II MC 230 kV TR 230/138 kV POCOES II TR1 BA RBF FT TR 230/138 kV POCOES II TR1 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 5/10/2042 368,372.83
  POCOES II MC 230 kV TR 230/138 kV POCOES II TR2 BA RBF FT TR 230/138 kV POCOES II TR2 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 5/10/2042 368,372.83
  POCOES II MG 230 kV POCOES II MG1 BA RB FT MG 230 kV POCOES II MG1 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 5/10/2042 1,075,292.26
  POCOES II TR 230/138 kV POCOES II TR1 BA RBF FT TR 230/138 kV POCOES II TR1 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 5/10/2042 1,191,711.75
  POCOES II TR 230/138 kV POCOES II TR2 BA RBF FT TR 230/138 kV POCOES II TR2 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 5/10/2042 1,191,711.75
  POLO EL 69 kV POLO  DIST1 DIT   014/2010 IPCA RPEC CC 014/2010 4/11/2016 10/6/2040 76,270.81
  POLO EL 69 kV POLO  DIST2 DIT   014/2010 IPCA RPEC CC 014/2010 4/11/2016 10/6/2040 76,270.81
  POLO EL 69 kV POLO  DIST3 DIT   014/2010 IPCA RPEC CC 014/2010 4/11/2016 10/6/2040 76,270.81
  POLO EL 69 kV POLO  DIST4 DIT   014/2010 IPCA RPEC CC 014/2010 4/11/2016 10/6/2040 76,270.81
  POLO EL 69 kV POLO  DIST5 DIT   014/2010 IPCA RPEC CC 014/2010 4/11/2016 10/6/2040 76,270.81
  POLO IB 69 kV MG 230 kV POLO MG2 BA IB1 DIT   014/2010 IPCA RPEC CC 014/2010 4/11/2016 10/6/2040 44,050.68
  POLO MC 230 kV TR 230/69 kV POLO TR1 BA RBF FT TR 230/69 kV POLO TR1 BA 014/2010 IPCA RBL CC 014/2010 4/11/2016 10/6/2040 211,595.83
  POLO MC 230 kV TR 230/69 kV POLO TR2 BA RBF FT TR 230/69 kV POLO TR2 BA 014/2010 IPCA RBNI REA 5686/2016 9/6/2018 9/6/2041 971,071.50

 

90 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  POLO MC 230 kV TR 230/69 kV POLO TR3 BA RBF FT TR 230/69 kV POLO TR3 BA 014/2010 IPCA RBNI REA 5686/2016 9/6/2018 9/6/2041 971,071.50
  POLO MC 69 kV TR 230/69 kV POLO TR1 BA RBF FT TR 230/69 kV POLO TR1 BA 014/2010 IPCA RBL CC 014/2010 4/11/2016 10/6/2040 84,142.07
  POLO MC 69 kV TR 230/69 kV POLO TR2 BA RBF FT TR 230/69 kV POLO TR2 BA 014/2010 IPCA RBNI REA 5686/2016 9/6/2018 9/6/2040 358,423.15
  POLO MC 69 kV TR 230/69 kV POLO TR3 BA RBF FT TR 230/69 kV POLO TR3 BA 014/2010 IPCA RBNI REA 5686/2016 9/6/2018 9/6/2040 358,423.15
  POLO MC 69 kV TT 69/0 kV POLO TT2 BA DIT   014/2010 IPCA RCDM REA 5686/2016 9/6/2018 9/6/2038 240,427.63
  POLO MC 69 kV TT 69/69 kV POLO TT1 BA DIT   014/2010 IPCA RPEC CC 014/2010 4/11/2016 10/6/2040 29,328.15
  POLO MG 230 kV POLO MG2 BA RB FT MG 230 kV POLO MG2 BA 014/2010 IPCA RBL CC 014/2010 4/11/2016 10/6/2040 468,943.27
  POLO MG 230 kV POLO MG2 BA RB FT MG 230 kV POLO MG2 BA 014/2010 IPCA RBNI REA 5686/2016 9/6/2018 9/6/2050 227,913.69
  POLO MG 230 kV POLO MG2 BA RB FT MG 230 kV POLO MG2 BA 014/2010 IPCA RBNI REA 5686/2016 9/6/2018 9/6/2049 65,651.05
  POLO MG 230 kV POLO MG2 BA RB FT MG 230 kV POLO MG2 BA 014/2010 IPCA RBNI REA 5686/2016 9/6/2018 9/6/2049 32,825.52
  POLO TR 230/69 kV POLO TR1 BA RBF FT TR 230/69 kV POLO TR1 BA 014/2010 IPCA RBL CC 014/2010 4/11/2016 10/6/2040 548,768.32
  POLO TR 230/69 kV POLO TR2 BA RBF FT TR 230/69 kV POLO TR2 BA 014/2010 IPCA RBNI REA 5686/2016 9/6/2018 9/6/2052 1,282,984.65
  POLO TR 230/69 kV POLO TR3 BA RBF FT TR 230/69 kV POLO TR3 BA 014/2010 IPCA RBNI REA 5686/2016 9/6/2018 9/6/2052 1,282,984.65
  POLO TT 69/0 kV POLO TT2 BA DIT   014/2010 IPCA RCDM REA 5686/2016 9/6/2018 9/6/2048 227,708.87
  POLO TT 69/69 kV POLO TT1 BA DIT   014/2010 IPCA RPEC CC 014/2010 4/11/2016 10/6/2040 27,128.58
  QUIXADA EL 500 kV QUIXADA LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 443/2011 28/02/2016 27/02/2046 49,161.79
  QUIXADA EL 500 kV QUIXADA LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  QUIXADA EL 500 kV QUIXADA LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBNI REA 5484/2015 14/02/2020 13/02/2053 210,166.56
  QUIXADA EL 500 kV QUIXADA LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 443/2011 28/02/2016 27/02/2046 49,161.79
  QUIXADA EL 500 kV QUIXADA LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/01/2016 28/01/2046 15,848.15
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/01/2016 28/01/2046 15,848.15
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/01/2016 28/01/2046 15,848.15
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/01/2016 28/01/2046 15,848.15
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/01/2016 28/01/2046 15,848.15
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 643/2014 10/3/2013 10/2/2043 14,822.44
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB2 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  QUIXADA MC 500 kV RTL 500 kV 180 Mvar QUIXADA RT1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  QUIXADA MC 500 kV RTL 500 kV 180 Mvar QUIXADA RT1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 443/2011 28/02/2016 27/02/2046 47,653.34
  QUIXADA MG 500 kV QUIXADA MG1 CE RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 10/3/2016 10/2/2033 27,322.19
  QUIXADA MG 500 kV QUIXADA MG1 CE RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 650,757.82
  QUIXADA RTL 500 kV 180 Mvar QUIXADA RT1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 751,260.15
  QUIXADA RTL 500 kV 180 Mvar QUIXADA RT1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 643/2014 25/10/2013 24/10/2048 39,802.25
  QUIXADA RTL 500 kV 60 Mvar QUIXADA RTR1 CE RB FT RTL 500 kV 60 Mvar QUIXADA RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,420.05
  QUIXERE EL 230 kV QUIXERE LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RBNI REA 6894/2018 7/1/2018 11/11/2038 109,055.24
  QUIXERE EL 230 kV QUIXERE LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RBNI REA 6894/2018 7/1/2018 11/11/2038 109,055.24
  QUIXERE IB 230 kV MG 230 kV QUIXERE MGA1 CE IB1 RB FT MG 230 kV QUIXERE MGA1 CE 061/2001 IPCA RBNI REA 6894/2018 7/1/2018 11/11/2039 66,101.68
  QUIXERE MG 230 kV QUIXERE MGA1 CE RB FT MG 230 kV QUIXERE MGA1 CE 061/2001 IPCA RBNI REA 6894/2018 7/1/2018 11/11/2033 41,447.02
  RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,846.49
  RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 166,756.08
  RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 539,655.22
  RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,846.49
  RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 166,756.08
  RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 539,655.22
  RECIFE II CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RMEL REN 443/2011 3/5/2016 3/4/2041 255,626.10
  RECIFE II CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,484,280.13
  RECIFE II CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,407,550.11
  RECIFE II CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,555,106.72
  RECIFE II CS 150/-105 MVAr RECIFE II CS2 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,484,280.13
  RECIFE II CS 150/-105 MVAr RECIFE II CS2 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,407,550.11
  RECIFE II CS 150/-105 MVAr RECIFE II CS2 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,555,106.72
  RECIFE II CS 150/-105 MVAr RECIFE II CS2 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RMEL REN 443/2011 11/11/2016 11/10/2041 253,089.06
  RECIFE II EL 230 kV RECIFE II LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 6137/2016 20/01/2021 20/01/2051 161,097.88
  RECIFE II EL 230 kV RECIFE II LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 7761/2019 5/2/2019 5/1/2034 11,669.98
  RECIFE II EL 230 kV RECIFE II LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RBNI REA 7761/2019 5/2/2019 5/1/2034 11,669.98
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RBNI REA 6137/2016 17/05/2021 17/05/2051 161,097.88
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RMEL REN 443/2011 23/01/2016 22/01/2046 12,388.89
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-2 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-2 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-2 PE 061/2001 IPCA RBNI REA 7761/2019 5/2/2019 5/1/2034 11,669.98
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBNIA REA 6137/2016     161,097.88
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBNI REA 6137/2016 31/07/2020 31/07/2050 86,445.12
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RMEL REN 443/2011 23/01/2016 22/01/2046 12,388.89
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RMEL REN 443/2011 23/01/2016 22/01/2046 12,388.89
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-2 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-2 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-2 PE 061/2001 IPCA RBNIA REA 6137/2016     161,097.88
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-3 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-3 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-3 PE 061/2001 IPCA RBNIA REA 6137/2016     161,097.88
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBNI REA 6137/2016 6/7/2021 6/7/2051 161,097.88
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RMEL REN 643/2014 12/8/2013 12/7/2041 34,319.01
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBNI REA 5861/2016 5/9/2017 5/8/2032 339.75
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBNI REA 5861/2016 31/05/2014 30/05/2029 3,564.87
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RMEL REN 643/2014 28/02/2014 27/02/2042 34,562.75
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBNI REA 6137/2016 20/01/2021 20/01/2051 161,097.88
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2042 34,651.92
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBNI REA 5861/2016 31/05/2014 30/05/2029 3,564.87
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RMEL REN 443/2011 11/8/2015 11/7/2045 12,316.99
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RMEL REN 443/2011 11/8/2015 11/7/2045 12,316.99
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RMEL REN 443/2011 11/8/2015 11/7/2045 12,316.99
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBNIA REA 6137/2016     161,097.88
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBNI REA 2040/2009 29/04/2015 28/04/2045 88,174.12
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBNIA REA 6137/2016     161,097.88
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBNI REA 2040/2009 29/04/2015 28/04/2045 88,174.12
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBNIA REA 6137/2016     161,097.88
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 6137/2016 1/3/2021 1/3/2051 93,262.08
  RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2042 34,651.92
  RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBNI REA 7761/2019 5/2/2019 5/1/2034 11,669.98
  RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBNI REA 6137/2016 8/12/2020 8/12/2050 161,097.88
  RECIFE II EL 500 kV RECIFE II LT 500 kV ANGELIM II /RECIFE II C-2 PE RB FT LT 500 kV ANGELIM II /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  RECIFE II EL 500 kV RECIFE II LT 500 kV PAU FERRO /RECIFE II C-1 PE RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  RECIFE II EL 500 kV RECIFE II LT 500 kV PAU FERRO /RECIFE II C-1 PE RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 5861/2016 6/8/2016 6/7/2044 24,297.02
  RECIFE II EL 500 kV RECIFE II LT 500 kV PAU FERRO /RECIFE II C-1 PE RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 5861/2016 6/8/2016 6/7/2031 92,507.40
  RECIFE II EL 500 kV RECIFE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RMEL REN 443/2011 21/08/2015 20/08/2045 15,653.41
  RECIFE II EL 500 kV RECIFE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RMEL REN 443/2011 21/08/2015 20/08/2045 15,653.41
  RECIFE II EL 500 kV RECIFE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  RECIFE II EL 500 kV RECIFE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76

 

91 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  RECIFE II EL 500 kV RECIFE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,322,567.42
  RECIFE II EL 69 kV RECIFE II LT 69 kV JABOATAO /RECIFE II C-1 RJ/PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 62,583.94
  RECIFE II EL 69 kV RECIFE II LT 69 kV JABOATAO /RECIFE II C-1 RJ/PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 61,914.93
  RECIFE II IB 230 kV MG 500 kV RECIFE II MG1 PE IB1 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  RECIFE II IB 230 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  RECIFE II IB 230 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  RECIFE II IB 230 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 374,783.88
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB1 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB1 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 25/09/2015 24/09/2045 15,695.75
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 25/09/2015 24/09/2045 15,695.75
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB3 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/09/2015 29/09/2045 15,701.80
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB3 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/09/2015 29/09/2045 15,701.80
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB3 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB4 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB4 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 8/7/2015 8/6/2045 15,636.48
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB4 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 8/7/2015 8/6/2045 15,636.48
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB4 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 8/7/2015 8/6/2045 15,636.48
  RECIFE II MC 13,8 kV CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,419.78
  RECIFE II MC 13,8 kV CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 52,554.84
  RECIFE II MC 13,8 kV CS 150/-105 MVAr RECIFE II CS2 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,419.78
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,812.30
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 157,240.61
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 508,861.29
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RMEL REN 443/2011 7/1/2016 30/06/2044 13,863.72
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBNIA REA 6137/2016     72,367.69
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RMEL REN 443/2011 28/07/2016 27/07/2044 13,893.72
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,812.30
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RBNIA REA 6137/2016     72,367.69
  RECIFE II MC 230 kV TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  RECIFE II MC 230 kV TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  RECIFE II MC 230 kV TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBNI REA 6137/2016 31/07/2020 31/07/2046 83,333.79
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044 55,247.18
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044 55,247.18
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,526.62
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR2 PE RB FT TR 500/230 kV RECIFE II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,526.62
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBNI REA 6137/2016 8/6/2020 8/6/2051 289,176.43
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,526.62
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBNI REA 6137/2016 15/07/2020 15/07/2046 83,333.79
  RECIFE II MC 500 kV RTL 500 kV 100 MVAr RECIFE II RT1 PE RB FT RTL 500 kV 100 MVAr RECIFE II RT1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  RECIFE II MC 500 kV RTL 500 kV 100 MVAr RECIFE II RT2 PE RB FT RTL 500 kV 100 MVAr RECIFE II RT2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR2 PE RB FT TR 500/230 kV RECIFE II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,697.68
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,697.68
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,167,288.04
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RMEL REN 443/2011 11/5/2015 11/4/2045 15,745.35
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RMEL REN 443/2011 11/5/2015 11/4/2045 31,490.69
  RECIFE II MC 69 kV TR 69/13,8 kV RECIFE II TR1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,531.97
  RECIFE II MC 69 kV TR 69/13,8 kV RECIFE II TR2 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,531.97
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,106,349.67
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,997,461.69
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,464,175.69
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 22,730.49
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 643/2014 6/7/2013 6/6/2030 48,415.87
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 72,394.29
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2044 50,158.30
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBNI REA 2376/2010 5/1/2012 30/04/2040 42,063.16
  RECIFE II RTL 500 kV 100 MVAr RECIFE II RT1 PE RB FT RTL 500 kV 100 MVAr RECIFE II RT1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 618,815.61
  RECIFE II RTL 500 kV 100 MVAr RECIFE II RT1 PE RB FT RTL 500 kV 100 MVAr RECIFE II RT1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 586,825.87
  RECIFE II RTL 500 kV 100 MVAr RECIFE II RT2 PE RB FT RTL 500 kV 100 MVAr RECIFE II RT2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 618,815.61
  RECIFE II RTL 500 kV 100 MVAr RECIFE II RT2 PE RB FT RTL 500 kV 100 MVAr RECIFE II RT2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 586,825.87
  RECIFE II RTL 500 kV 33,3 Mvar RECIFE II RTR1 PE RB FT RTL 500 kV 33,3 Mvar RECIFE II RTR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 206,196.72
  RECIFE II RTL 500 kV 33,3 Mvar RECIFE II RTR1 PE RB FT RTL 500 kV 33,3 Mvar RECIFE II RTR1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 195,537.36
  RECIFE II TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 652,701.12
  RECIFE II TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 618,959.66
  RECIFE II TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,003,074.21
  RECIFE II TR 230/13,8 kV RECIFE II TRR1 PE RB FT TR 230/13,8 kV RECIFE II TRR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 217,567.04
  RECIFE II TR 230/13,8 kV RECIFE II TRR1 PE RB FT TR 230/13,8 kV RECIFE II TRR1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 206,319.89
  RECIFE II TR 230/13,8 kV RECIFE II TRR1 PE RB FT TR 230/13,8 kV RECIFE II TRR1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 667,691.40
  RECIFE II TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  RECIFE II TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,624,997.02
  RECIFE II TR 500/230 kV RECIFE II TR2 PE RB FT TR 500/230 kV RECIFE II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  RECIFE II TR 500/230 kV RECIFE II TR2 PE RB FT TR 500/230 kV RECIFE II TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,624,997.02
  RECIFE II TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  RECIFE II TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,624,997.02
  RECIFE II TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,258,807.35
  RECIFE II TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  RECIFE II TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,624,997.02
  RECIFE II TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,258,807.35
  RECIFE II TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RMEL REN 643/2014 22/09/2013 21/09/2047 16,596.29
  RECIFE II TR 500/230 kV RECIFE II TR4C PE RB FT TR 500/230 kV RECIFE II TR4C PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 571,193.59
  RECIFE II TR 500/230 kV RECIFE II TRR1 PE RB FT TR 500/230 kV RECIFE II TRR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 571,193.59
  RECIFE II TR 500/230 kV RECIFE II TRR1 PE RB FT TR 500/230 kV RECIFE II TRR1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 541,665.67
  RECIFE II TR 69/13,8 kV RECIFE II TR1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  RECIFE II TR 69/13,8 kV RECIFE II TR1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  RECIFE II TR 69/13,8 kV RECIFE II TR1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  RECIFE II TR 69/13,8 kV RECIFE II TR2 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  RECIFE II TR 69/13,8 kV RECIFE II TR2 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  RECIFE II TR 69/13,8 kV RECIFE II TR2 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBNI REA 3817/2013 20/08/2019 20/08/2044 637,442.24
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2042 35,380.13
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBNI REA 3817/2013 20/08/2019 20/08/2044 637,442.24
  RIBEIRAO EL 69 kV RIBEIRAO  DIS10 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RIBEIRAO EL 69 kV RIBEIRAO  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RIBEIRAO EL 69 kV RIBEIRAO  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RIBEIRAO EL 69 kV RIBEIRAO  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  RIBEIRAO EL 69 kV RIBEIRAO  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84

 

92 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  RIBEIRAO EL 69 kV RIBEIRAO  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RIBEIRAO EL 69 kV RIBEIRAO  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  RIBEIRAO EL 69 kV RIBEIRAO  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RIBEIRAO EL 69 kV RIBEIRAO  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RIBEIRAO EL 69 kV RIBEIRAO  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  RIBEIRAO EL 69 kV RIBEIRAO  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RIBEIRAO EL 69 kV RIBEIRAO  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RIBEIRAO EL 69 kV RIBEIRAO  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  RIBEIRAO EL 69 kV RIBEIRAO  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RIBEIRAO EL 69 kV RIBEIRAO  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RIBEIRAO EL 69 kV RIBEIRAO  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  RIBEIRAO EL 69 kV RIBEIRAO  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RIBEIRAO EL 69 kV RIBEIRAO  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RIBEIRAO EL 69 kV RIBEIRAO  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  RIBEIRAO EL 69 kV RIBEIRAO  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RIBEIRAO EL 69 kV RIBEIRAO  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RIBEIRAO EL 69 kV RIBEIRAO  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  RIBEIRAO EL 69 kV RIBEIRAO  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RIBEIRAO EL 69 kV RIBEIRAO  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RIBEIRAO EL 69 kV RIBEIRAO  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  RIBEIRAO EL 69 kV RIBEIRAO  DIST9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RIBEIRAO EL 69 kV RIBEIRAO  DIST9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RIBEIRAO EL 69 kV RIBEIRAO  DIST9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  RIBEIRAO IB 230 kV MG 230 kV RIBEIRAO MG1 PE IB1 RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  RIBEIRAO IB 230 kV MG 230 kV RIBEIRAO MG1 PE IB1 RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 100,801.10
  RIBEIRAO IB 230 kV MG 230 kV RIBEIRAO MG1 PE IB1 RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 326,212.02
  RIBEIRAO IB 69 kV MG 230 kV RIBEIRAO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  RIBEIRAO IB 69 kV MG 230 kV RIBEIRAO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  RIBEIRAO IB 69 kV MG 230 kV RIBEIRAO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR1 PE RBF FT TR 230/69 kV RIBEIRAO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR4 PE RBF FT TR 230/69 kV RIBEIRAO TR4 PE 061/2001 IPCA RBNI REA 3965/2013 14/11/2016 13/11/2046 1,040,552.94
  RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR1 PE RBF FT TR 230/69 kV RIBEIRAO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR4 PE RBF FT TR 230/69 kV RIBEIRAO TR4 PE 061/2001 IPCA RBNI REA 3965/2013 14/11/2016 13/11/2046 402,639.90
  RIBEIRAO MG 230 kV RIBEIRAO MG1 PE RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 485,933.82
  RIBEIRAO MG 230 kV RIBEIRAO MG1 PE RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 460,813.41
  RIBEIRAO MG 230 kV RIBEIRAO MG1 PE RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,491,282.10
  RIBEIRAO MG 230 kV RIBEIRAO MG1 PE RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBNI REA 3965/2013 14/11/2016 13/11/2044 238,193.51
  RIBEIRAO MG 230 kV RIBEIRAO MG1 PE RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBNI REA 3817/2013 20/08/2019 20/08/2050 102,719.50
  RIBEIRAO TR 230/69 kV RIBEIRAO TR1 PE RBF FT TR 230/69 kV RIBEIRAO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  RIBEIRAO TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  RIBEIRAO TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  RIBEIRAO TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  RIBEIRAO TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  RIBEIRAO TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  RIBEIRAO TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  RIBEIRAO TR 230/69 kV RIBEIRAO TR4 PE RBF FT TR 230/69 kV RIBEIRAO TR4 PE 061/2001 IPCA RBNI REA 3965/2013 14/11/2016 13/11/2050 1,341,178.52
  RIBEIRAO TT 69/0 kV RIBEIRAO TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  RIBEIRAO TT 69/13,8 kV RIBEIRAO TA1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  RIBEIRAO TT 69/13,8 kV RIBEIRAO TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  RIBEIRAO TT 69/13,8 kV RIBEIRAO TA1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  RIO LARGO II BC 69 kV 21,3 Mvar RIO LARGO II BC1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,662.17
  RIO LARGO II BC 69 kV 21,3 Mvar RIO LARGO II BC3 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,662.17
  RIO LARGO II BC 69 kV 21,3 Mvar RIO LARGO II BC4 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,662.17
  RIO LARGO II BC 69 kV 27,1 Mvar RIO LARGO II BC2 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,634.31
  RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV MESSIAS /RIO LARGO II C-2 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV MESSIAS /RIO LARGO II C-3 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV RIO LARGO II /BRASKEM C-1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 192,089.95
  RIO LARGO II EL 69 kV RIO LARGO II  RIO LARGO I DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RIO LARGO II EL 69 kV RIO LARGO II  RIO LARGO I DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RIO LARGO II EL 69 kV RIO LARGO II  S.L.QUITUNDE 1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RIO LARGO II EL 69 kV RIO LARGO II  S.L.QUITUNDE 1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RIO LARGO II EL 69 kV RIO LARGO II  S.L.QUITUNDE 2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RIO LARGO II EL 69 kV RIO LARGO II  S.L.QUITUNDE 2 DIT   061/2001 IPCA RCDM REA 1814/2009 30/09/2012 29/09/2043 265,634.57
  RIO LARGO II EL 69 kV RIO LARGO II  TAB.MARTINS 1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RIO LARGO II EL 69 kV RIO LARGO II  TAB.MARTINS 1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RIO LARGO II EL 69 kV RIO LARGO II  TAB.MARTINS 2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RIO LARGO II EL 69 kV RIO LARGO II  TAB.MARTINS 2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RIO LARGO II EL 69 kV RIO LARGO II  VAGO DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RIO LARGO II EL 69 kV RIO LARGO II  VAGO DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RIO LARGO II IB 230 kV MG 230 kV RIO LARGO II MG1 AL IB1 RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  RIO LARGO II IB 69 kV MG 230 kV RIO LARGO II MG1 AL IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  RIO LARGO II IB 69 kV MG 230 kV RIO LARGO II MG1 AL IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  RIO LARGO II MC 230 kV TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  RIO LARGO II MC 230 kV TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  RIO LARGO II MC 230 kV TR 230/69 kV RIO LARGO II TR3 AL RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  RIO LARGO II MC 230 kV TR 230/69 kV RIO LARGO II TR3 AL RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  RIO LARGO II MC 230 kV TR 230/69 kV RIO LARGO II TR5 AL RBF FT TR 230/69 kV RIO LARGO II TR5 AL 061/2001 IPCA RBNI REA 2823/2011 17/02/2014 16/02/2044 1,024,436.52
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC1 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC1 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC3 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC3 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC3 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC4 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC4 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC4 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  RIO LARGO II MC 69 kV BC 69 kV 27,1 Mvar RIO LARGO II BC2 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  RIO LARGO II MC 69 kV BC 69 kV 27,1 Mvar RIO LARGO II BC2 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  RIO LARGO II MC 69 kV BC 69 kV 27,1 Mvar RIO LARGO II BC2 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  RIO LARGO II MC 69 kV TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  RIO LARGO II MC 69 kV TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  RIO LARGO II MC 69 kV TR 230/69 kV RIO LARGO II TR3 AL RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  RIO LARGO II MC 69 kV TR 230/69 kV RIO LARGO II TR5 AL RBF FT TR 230/69 kV RIO LARGO II TR5 AL 061/2001 IPCA RBNI REA 2823/2011 17/02/2014 16/02/2045 399,299.53
  RIO LARGO II MC 69 kV TR 69/13,8 kV RIO LARGO II TR4 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  RIO LARGO II MC 69 kV TR 69/13,8 kV RIO LARGO II TR4 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83

 

93 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  RIO LARGO II MC 69 kV TR 69/13,8 kV RIO LARGO II TR4 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBNI REA 2823/2011 17/02/2014 16/02/2044 925,994.51
  RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 511,189.50
  RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 484,763.50
  RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,568,789.25
  RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 23,222.36
  RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RMEL REN 643/2014 8/9/2013 8/8/2030 24,949.89
  RIO LARGO II TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  RIO LARGO II TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  RIO LARGO II TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  RIO LARGO II TR 230/69 kV RIO LARGO II TR3 AL RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  RIO LARGO II TR 230/69 kV RIO LARGO II TR3 AL RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  RIO LARGO II TR 230/69 kV RIO LARGO II TR3 AL RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  RIO LARGO II TR 230/69 kV RIO LARGO II TR5 AL RBF FT TR 230/69 kV RIO LARGO II TR5 AL 061/2001 IPCA RBNI REA 2823/2011 17/02/2014 16/02/2048 1,263,450.78
  RIO LARGO II TR 69/13,8 kV RIO LARGO II TR4 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  RIO LARGO II TR 69/13,8 kV RIO LARGO II TR4 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  RIO LARGO II TR 69/13,8 kV RIO LARGO II TR4 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  RIO LARGO II TT 69/13,8 kV RIO LARGO II TA1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  RIO LARGO II TT 69/13,8 kV RIO LARGO II TA1 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  RIO LARGO II TT 69/13,8 kV RIO LARGO II TA1 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  RIO LARGO II TT 69/13,8 kV RIO LARGO II TA2 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  RIO LARGO II TT 69/13,8 kV RIO LARGO II TA2 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  RIO LARGO II TT 69/13,8 kV RIO LARGO II TA2 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  RUSSAS II EL 230 kV RUSSAS II LT 230 kV BANABUIU /RUSSAS II C-1 CE RB FT LT 230 kV BANABUIU /RUSSAS II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RUSSAS II EL 230 kV RUSSAS II LT 230 kV BANABUIU /RUSSAS II C-1 CE RB FT LT 230 kV BANABUIU /RUSSAS II C-1 CE 061/2001 IPCA RMEL REN 443/2011 16/07/2017 15/07/2047 40,455.45
  RUSSAS II EL 230 kV RUSSAS II LT 230 kV RUSSAS II /BANABUIU C-2 CE RB FT LT 230 kV RUSSAS II /BANABUIU C-1 CE 018/2012 IPCA RBL CC 018/2012 15/12/2020 6/1/2042 441,712.23
  RUSSAS II EL 230 kV RUSSAS II LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  RUSSAS II EL 230 kV RUSSAS II LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RMEL REN 443/2011 5/1/2016 30/04/2046 12,482.54
  RUSSAS II EL 230 kV RUSSAS II LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RMEL REN 443/2011 23/07/2017 22/07/2047 60,713.88
  RUSSAS II EL 69 kV RUSSAS II  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RUSSAS II EL 69 kV RUSSAS II  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RUSSAS II EL 69 kV RUSSAS II  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RUSSAS II EL 69 kV RUSSAS II  DIST2 DIT   061/2001 IPCA RMEL REN 443/2011 24/04/2016 23/04/2046 7,500.21
  RUSSAS II EL 69 kV RUSSAS II  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RUSSAS II EL 69 kV RUSSAS II  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  RUSSAS II EL 69 kV RUSSAS II  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RUSSAS II EL 69 kV RUSSAS II  DIST4 DIT   061/2001 IPCA RMEL REN 643/2014 2/9/2014 2/8/2044 32,133.03
  RUSSAS II EL 69 kV RUSSAS II  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  RUSSAS II IB 230 kV MG 230 kV RUSSAS II MG1 CE IB1 RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  RUSSAS II IB 69 kV MG 230 kV RUSSAS II MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  RUSSAS II MC 230 kV TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  RUSSAS II MC 230 kV TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RMEL REN 443/2011 7/9/2017 7/8/2047 60,652.45
  RUSSAS II MC 230 kV TR 230/69 kV RUSSAS II TR3 CE RBF FT TR 230/69 kV RUSSAS II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  RUSSAS II MC 230 kV TR 230/69 kV RUSSAS II TR4 CE RBF FT TR 230/69 kV RUSSAS II TR4 CE 061/2001 IPCA RBNI REA 2823/2011 29/09/2014 28/09/2044 1,140,387.69
  RUSSAS II MC 69 kV TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  RUSSAS II MC 69 kV TR 230/69 kV RUSSAS II TR3 CE RBF FT TR 230/69 kV RUSSAS II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  RUSSAS II MC 69 kV TR 230/69 kV RUSSAS II TR4 CE RBF FT TR 230/69 kV RUSSAS II TR4 CE 061/2001 IPCA RBNI REA 2823/2011 29/09/2014 28/09/2045 405,381.47
  RUSSAS II MC 69 kV TT 69/13,8 kV RUSSAS II TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  RUSSAS II MC 69 kV TT 69/13,8 kV RUSSAS II TA2 CE DIT   061/2001 IPCA RCDM REA 2412/2010 20/06/2012 19/06/2043 265,504.55
  RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBNI REA 2823/2011 29/09/2014 28/09/2042 175,197.87
  RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,470.42
  RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 440,459.57
  RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,425,413.10
  RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RMEL REN 443/2011 17/05/2016 16/05/2046 12,497.67
  RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RMEL REN 643/2014 31/01/2014 30/01/2031 23,615.88
  RUSSAS II TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  RUSSAS II TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  RUSSAS II TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  RUSSAS II TR 230/69 kV RUSSAS II TR3 CE RBF FT TR 230/69 kV RUSSAS II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  RUSSAS II TR 230/69 kV RUSSAS II TR4 CE RBF FT TR 230/69 kV RUSSAS II TR4 CE 061/2001 IPCA RBNI REA 2823/2011 29/09/2014 28/09/2048 1,280,844.39
  RUSSAS II TT 69/13,8 kV RUSSAS II TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  RUSSAS II TT 69/13,8 kV RUSSAS II TA2 CE DIT   061/2001 IPCA RCDM REA 2412/2010 20/06/2012 19/06/2042 246,525.73
  S.JOAO PIAUI CR 500 kV 436 MVAr S.JOAO PIAUI BC1 PI RB FT CR 500 kV 436 MVAr S.JOAO PIAUI BC1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,232,637.41
  S.JOAO PIAUI CR 500 kV 484 MVAr S.JOAO PIAUI BC2 PI RB FT CR 500 kV 484 MVAr S.JOAO PIAUI BC2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,340,938.06
  S.JOAO PIAUI EL 230 kV S.JOAO PIAUI LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  S.JOAO PIAUI EL 230 kV S.JOAO PIAUI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  S.JOAO PIAUI EL 230 kV S.JOAO PIAUI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  S.JOAO PIAUI EL 230 kV S.JOAO PIAUI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  S.JOAO PIAUI EL 230 kV S.JOAO PIAUI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  S.JOAO PIAUI EL 500 kV S.JOAO PIAUI LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  S.JOAO PIAUI EL 500 kV S.JOAO PIAUI LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  S.JOAO PIAUI EL 69 kV S.JOAO PIAUI  C.BURITI-02J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  S.JOAO PIAUI EL 69 kV S.JOAO PIAUI  DIST1 DIT   061/2001 IPCA RCDM REN 905/2020 23/10/2017 22/10/2044 417,784.35
  S.JOAO PIAUI EL 69 kV S.JOAO PIAUI  S.MENDES-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  S.JOAO PIAUI IB 230 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  S.JOAO PIAUI IB 230 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  S.JOAO PIAUI IB 230 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 374,783.88
  S.JOAO PIAUI IB 500 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  S.JOAO PIAUI IB 500 kV MG 500 kV S.JOAO PIAUI MG1 PI IB2 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBNI REA 3208/2011 11/3/2016 11/2/2047 817,460.01
  S.JOAO PIAUI IB 500 kV MG 500 kV S.JOAO PIAUI MG1 PI IB2 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  S.JOAO PIAUI IB 69 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  S.JOAO PIAUI IB 69 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  S.JOAO PIAUI MC 13,8 kV TR 500/230 kV S.JOAO PIAUI TR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  S.JOAO PIAUI MC 13,8 kV TR 69/13,8 kV S.JOAO PIAUI TR5 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  S.JOAO PIAUI MC 230 kV TR 230/69 kV S.JOAO PIAUI TR3 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  S.JOAO PIAUI MC 230 kV TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  S.JOAO PIAUI MC 230 kV TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  S.JOAO PIAUI MC 230 kV TR 230/69 kV S.JOAO PIAUI TR8 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR8 PI 061/2001 IPCA RBNI REA 2460/2010 23/12/2013 22/12/2043 1,061,675.72
  S.JOAO PIAUI MC 230 kV TR 500/230 kV S.JOAO PIAUI TR1 PI MC1 RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  S.JOAO PIAUI MC 230 kV TR 500/230 kV S.JOAO PIAUI TR1 PI MC2 RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  S.JOAO PIAUI MC 500 kV RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI RB FT RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  S.JOAO PIAUI MC 500 kV RTL 500 kV 100 MVAr S.JOAO PIAUI RT2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  S.JOAO PIAUI MC 500 kV TR 500/230 kV S.JOAO PIAUI TR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBNI REA 3208/2011 16/11/2016 15/11/2047 771,686.78
  S.JOAO PIAUI MC 500 kV TR 500/230 kV S.JOAO PIAUI TR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  S.JOAO PIAUI MC 69 kV RTN 69 kV 0 Mvar S.JOAO PIAUI RTN1 PI RB FT RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,600.99
  S.JOAO PIAUI MC 69 kV RTN 69 kV 0 Mvar S.JOAO PIAUI RTN2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,600.99
  S.JOAO PIAUI MC 69 kV TR 230/69 kV S.JOAO PIAUI TR3 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  S.JOAO PIAUI MC 69 kV TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  S.JOAO PIAUI MC 69 kV TR 230/69 kV S.JOAO PIAUI TR8 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR8 PI 061/2001 IPCA RBNI REA 2460/2010 23/12/2013 22/12/2043 375,435.38
  S.JOAO PIAUI MC 69 kV TT 69/13,8 kV S.JOAO PIAUI TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RMEL REN 643/2014 16/12/2014 15/12/2031 26,095.53
  S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBNI REN 905/2020 23/10/2017 22/10/2048 34,595.63
  S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBNI REA 2460/2010 23/12/2013 22/12/2043 148,356.34
  S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,147,298.87
  S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,087,989.13
  S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,520,945.05
  S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI RB FT RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 618,815.61
  S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI RB FT RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 586,825.87
  S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RMEL REA 9918/2021 26/05/2021 26/05/2057 475,358.18
  S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RMEL REA 9918/2021 26/05/2021 26/05/2057 475,358.18

 

94 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  S.JOAO PIAUI RTL 500 kV 100 Mvar S.JOAO PIAUI RT2D PI RB FT RTL 500 kV 100 Mvar S.JOAO PIAUI RT2D PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 618,815.61
  S.JOAO PIAUI RTL 500 kV 100 Mvar S.JOAO PIAUI RT2D PI RB FT RTL 500 kV 100 Mvar S.JOAO PIAUI RT2D PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 586,825.87
  S.JOAO PIAUI RTL 500 kV 100 Mvar S.JOAO PIAUI RT2D PI RB FT RTL 500 kV 100 Mvar S.JOAO PIAUI RT2D PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,899,082.99
  S.JOAO PIAUI RTL 500 kV 100 Mvar S.JOAO PIAUI RT2D PI RB FT RTL 500 kV 100 Mvar S.JOAO PIAUI RT2D PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 618,815.61
  S.JOAO PIAUI RTL 500 kV 100 Mvar S.JOAO PIAUI RT2D PI RB FT RTL 500 kV 100 Mvar S.JOAO PIAUI RT2D PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 586,825.87
  S.JOAO PIAUI RTL 500 kV 100 Mvar S.JOAO PIAUI RT2D PI RB FT RTL 500 kV 100 Mvar S.JOAO PIAUI RT2D PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,899,082.99
  S.JOAO PIAUI RTN 69 kV 0 Mvar S.JOAO PIAUI RTN1 PI RB FT RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,662.15
  S.JOAO PIAUI RTN 69 kV 0 Mvar S.JOAO PIAUI RTN2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,662.15
  S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR3 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,742.87
  S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR3 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR3 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 160,967.99
  S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR3 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR3 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 520,923.83
  S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,742.87
  S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 160,967.99
  S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 520,923.83
  S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR8 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR8 PI 061/2001 IPCA RBNI REA 2460/2010 23/12/2013 22/12/2047 960,690.10
  S.JOAO PIAUI TR 500/230 kV S.JOAO PIAUI TR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,335,221.55
  S.JOAO PIAUI TR 500/230 kV S.JOAO PIAUI TR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,266,197.12
  S.JOAO PIAUI TR 500/230 kV S.JOAO PIAUI TRR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TRR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 445,073.85
  S.JOAO PIAUI TR 500/230 kV S.JOAO PIAUI TRR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TRR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 422,065.71
  S.JOAO PIAUI TR 69/13,8 kV S.JOAO PIAUI TR5 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  S.JOAO PIAUI TR 69/13,8 kV S.JOAO PIAUI TR5 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  S.JOAO PIAUI TT 69/13,8 kV S.JOAO PIAUI TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  S.JOAO PIAUI TT 69/13,8 kV S.JOAO PIAUI TA1 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  SAN.MATOS II BC 13,8 kV 1,8 Mvar SAN.MATOS II BC1 RN DIT   061/2001 IPCA RMEL REN 643/2014 1/8/2014 1/7/2028 5,313.86
  SAN.MATOS II BC 13,8 kV 1,8 Mvar SAN.MATOS II BC1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 26,859.07
  SAN.MATOS II BC 13,8 kV 1,8 Mvar SAN.MATOS II BC2 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 26,859.07
  SAN.MATOS II BC 13,8 kV 1,8 Mvar SAN.MATOS II BC2 RN DIT   061/2001 IPCA RMEL REN 643/2014 1/10/2014 1/9/2028 8,257.73
  SAN.MATOS II EL 138 kV SAN.MATOS II LT 138 kV ACU II /SAN.MATOS II C-1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2041 618,734.14
  SAN.MATOS II EL 138 kV SAN.MATOS II LT 138 kV ACU II /SAN.MATOS II C-1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 105,194.68
  SAN.MATOS II EL 138 kV SAN.MATOS II LT 138 kV SAN.MATOS II /CUR.NOVOS II C-1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2041 618,734.14
  SAN.MATOS II EL 69 kV SAN.MATOS II  JUCURUTU DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 62,583.94
  SAN.MATOS II EL 69 kV SAN.MATOS II  JUCURUTU DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2043 267,180.17
  SAN.MATOS II EL 69 kV SAN.MATOS II  MIGUEL ANGICOS DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2043 267,180.17
  SAN.MATOS II EL 69 kV SAN.MATOS II  MIGUEL ANGICOS DIT   061/2001 IPCA RMEL REN 443/2011 17/03/2016 16/03/2046 7,478.60
  SAN.MATOS II EL 69 kV SAN.MATOS II  MIGUEL ANGICOS DIT   061/2001 IPCA RMEL REN 443/2011 17/03/2016 16/03/2046 7,478.60
  SAN.MATOS II EL 69 kV SAN.MATOS II  MIGUEL ANGICOS DIT   061/2001 IPCA RMEL REN 443/2011 17/03/2016 16/03/2039 6,219.48
  SAN.MATOS II EL 69 kV SAN.MATOS II  MIGUEL ANGICOS DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 62,583.94
  SAN.MATOS II IB 138 kV MG 138 kV SAN.MATOS II MG1 RN IB1 DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2041 323,258.62
  SAN.MATOS II IB 69 kV MG 138 kV SAN.MATOS II MG1 RN IB1 DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2047 247,695.05
  SAN.MATOS II MC 13,8 kV BC 13,8 kV 1,8 Mvar SAN.MATOS II BC1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  SAN.MATOS II MC 13,8 kV BC 13,8 kV 1,8 Mvar SAN.MATOS II BC2 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  SAN.MATOS II MC 13,8 kV RTB 13,8 kV 5 Mvar SAN.MATOS II RT1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,529.70
  SAN.MATOS II MC 138 kV TR 138/69 kV SAN.MATOS II TR1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2040 422,934.14
  SAN.MATOS II MC 138 kV TR 138/69 kV SAN.MATOS II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2040 422,934.14
  SAN.MATOS II MC 69 kV TR 138/69 kV SAN.MATOS II TR1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2042 230,731.16
  SAN.MATOS II MC 69 kV TR 138/69 kV SAN.MATOS II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2042 284,519.55
  SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 293,770.19
  SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 290,629.83
  SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2044 878,361.08
  SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2050 222,208.65
  SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2050 80,901.60
  SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RMEL REN 643/2014 31/07/2015 30/07/2043 47,742.75
  SAN.MATOS II RTB 13,8 kV 5 Mvar SAN.MATOS II RT1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 113,225.78
  SAN.MATOS II RTB 13,8 kV 5 Mvar SAN.MATOS II RT1 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 112,015.41
  SAN.MATOS II TR 138/69 kV SAN.MATOS II TR1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2053 708,358.66
  SAN.MATOS II TR 138/69 kV SAN.MATOS II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2053 708,358.66
  SAN.MATOS II TT 69/0 kV SAN.MATOS II TA1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2049 165,183.10
  SANTA CRUZ II EL 13,8 kV SANTA CRUZ II  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  SANTA CRUZ II EL 13,8 kV SANTA CRUZ II  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  SANTA CRUZ II EL 138 kV SANTA CRUZ II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2041 618,734.14
  SANTA CRUZ II EL 138 kV SANTA CRUZ II LT 138 kV CUR.NOVOS II /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2041 618,734.14
  SANTA CRUZ II EL 138 kV SANTA CRUZ II LT 138 kV PARAISO /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2041 618,734.14
  SANTA CRUZ II EL 69 kV SANTA CRUZ II  CUITE DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2043 267,180.17
  SANTA CRUZ II EL 69 kV SANTA CRUZ II  TANGARA DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2043 267,180.17
  SANTA CRUZ II IB 138 kV MG 138 kV SANTA CRUZ II MG1 RN IB1 DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2041 323,258.62
  SANTA CRUZ II IB 69 kV MG 138 kV SANTA CRUZ II MG1 RN IB1 DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2047 148,812.12
  SANTA CRUZ II MC 13,8 kV TR 69/13,8 kV SANTA CRUZ II TR2A RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  SANTA CRUZ II MC 13,8 kV TR 69/13,8 kV SANTA CRUZ II TR2B RN DIT   061/2001 IPCA RCDM REA 4576/2014 20/09/2019 20/09/2039 68,844.78
  SANTA CRUZ II MC 138 kV RTB 138 kV 10 Mvar SANTA CRUZ II RT1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,338.71
  SANTA CRUZ II MC 138 kV RTB 138 kV 10 Mvar SANTA CRUZ II RT1 RN DIT   061/2001 IPCA RCDM REA 1814/2009 12/10/2012 12/9/2045 64,135.70
  SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 20/09/2019 20/09/2040 422,934.14
  SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,942.17
  SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 91,948.63
  SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 287,389.70
  SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2040 422,934.14
  SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR3 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2040 422,934.14
  SANTA CRUZ II MC 69 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 20/09/2019 20/09/2042 230,731.16
  SANTA CRUZ II MC 69 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,615.66
  SANTA CRUZ II MC 69 kV TR 138/69 kV SANTA CRUZ II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2042 230,731.16
  SANTA CRUZ II MC 69 kV TR 138/69 kV SANTA CRUZ II TR3 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2042 186,914.25
  SANTA CRUZ II MC 69 kV TR 69/13,8 kV SANTA CRUZ II TR2A RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,615.66
  SANTA CRUZ II MC 69 kV TR 69/13,8 kV SANTA CRUZ II TR2B RN DIT   061/2001 IPCA RCDM REA 4576/2014 20/09/2019 20/09/2042 90,491.96
  SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 326,734.57
  SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2050 877,752.59
  SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2050 296,278.20
  SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2050 129,442.55
  SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 23,151.47
  SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RMEL REN 643/2014 21/05/2013 20/05/2030 13,767.87
  SANTA CRUZ II RTB 138 kV 10 Mvar SANTA CRUZ II RT1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,714.62
  SANTA CRUZ II TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 176,579.73
  SANTA CRUZ II TR 138/69 kV SANTA CRUZ II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2053 708,358.66
  SANTA CRUZ II TR 138/69 kV SANTA CRUZ II TR3 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2053 708,358.66
  SANTA CRUZ II TR 69/13 kV SANTA CRUZ II TR2C RN DIT   061/2001 IPCA RCDM REA 4576/2014 20/09/2019 20/09/2054 130,976.22
  SANTA CRUZ II TR 69/13,8 kV SANTA CRUZ II TR2A RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  SANTA CRUZ II TT 69/13,8 kV SANTA CRUZ II TA1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  SANTA RITA II BC 69 kV 21 Mvar SANTA RITA II BC1 PB DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 255,642.27
  SANTA RITA II BC 69 kV 21 Mvar SANTA RITA II BC2 PB DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 255,642.27
  SANTA RITA II EL 230 kV SANTA RITA II LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB 061/2001 IPCA RBNI REA 10199/2021 17/05/2021 17/05/2049 131,990.95
  SANTA RITA II EL 230 kV SANTA RITA II LT 230 kV PAU FERRO /SANTA RITA II C-2856 PE/PB RB FT LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB 017/2009 IPCA RBL CC 017/2009 30/01/2021 8/3/2039 631,203.01
  SANTA RITA II EL 230 kV SANTA RITA II LT 230 kV SANTA RITA II /MUSSURE II C-1 PB RB FT LT 230 kV SANTA RITA II /MUSSURE II C-1 PB 061/2001 IPCA RBNI REA 10199/2021 17/05/2021 17/05/2049 131,990.95
  SANTA RITA II EL 69 kV SANTA RITA II  DIST1 DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 150,607.69
  SANTA RITA II EL 69 kV SANTA RITA II  DIST2 DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 150,607.69
  SANTA RITA II EL 69 kV SANTA RITA II  DIST3 DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 150,607.69
  SANTA RITA II EL 69 kV SANTA RITA II  DIST4 DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 150,607.69
  SANTA RITA II IB 230 kV MG 230 kV SANTA RITA II MG1 PB IB1 RB FT MG 230 kV SANTA RITA II MG1 PB 017/2009 IPCA RBL CC 017/2009 30/01/2021 8/3/2039 310,154.41
  SANTA RITA II IB 69 kV MG 230 kV SANTA RITA II MG1 PB IB1 DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 100,000.17
  SANTA RITA II MC 230 kV TR 230/69 kV SANTA RITA II TR1 PB RBF FT TR 230/69 kV SANTA RITA II TR1 PB 017/2009 IPCA RBL CC 017/2009 30/01/2021 8/3/2039 382,153.42
  SANTA RITA II MC 230 kV TR 230/69 kV SANTA RITA II TR2 PB RBF FT TR 230/69 kV SANTA RITA II TR2 PB 017/2009 IPCA RBL CC 017/2009 30/01/2021 8/3/2039 382,153.42
  SANTA RITA II MC 230 kV TR 230/69 kV SANTA RITA II TR3 PB RBF FT TR 230/69 kV SANTA RITA II TR3 PB 017/2009 IPCA RBNI REA 3892/2013 22/02/2016 22/02/2040 722,176.88
  SANTA RITA II MC 69 kV BC 69 kV 21 Mvar SANTA RITA II BC1 PB DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 138,789.31

 

95 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  SANTA RITA II MC 69 kV BC 69 kV 21 Mvar SANTA RITA II BC2 PB DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 138,789.31
  SANTA RITA II MC 69 kV TR 230/69 kV SANTA RITA II TR1 PB RBF FT TR 230/69 kV SANTA RITA II TR1 PB 017/2009 IPCA RBL CC 017/2009 30/01/2021 8/3/2039 138,037.05
  SANTA RITA II MC 69 kV TR 230/69 kV SANTA RITA II TR2 PB RBF FT TR 230/69 kV SANTA RITA II TR2 PB 017/2009 IPCA RBL CC 017/2009 30/01/2021 8/3/2039 138,037.05
  SANTA RITA II MC 69 kV TR 230/69 kV SANTA RITA II TR3 PB RBF FT TR 230/69 kV SANTA RITA II TR3 PB 017/2009 IPCA RBNI REA 3892/2013 22/02/2016 22/02/2039 285,008.36
  SANTA RITA II MC 69 kV TT 69/0 kV SANTA RITA II TT1 PB DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 75,630.17
  SANTA RITA II MG 230 kV SANTA RITA II MG1 PB RB FT MG 230 kV SANTA RITA II MG1 PB 017/2009 IPCA RBL CC 017/2009 30/01/2021 8/3/2039 931,361.16
  SANTA RITA II MG 230 kV SANTA RITA II MG1 PB RB FT MG 230 kV SANTA RITA II MG1 PB 017/2009 IPCA RBNI REA 4347/2013 5/8/2017 5/7/2049 92,838.14
  SANTA RITA II MG 230 kV SANTA RITA II MG1 PB RB FT MG 230 kV SANTA RITA II MG1 PB 017/2009 IPCA RBNI REA 3892/2013 22/02/2016 22/02/2050 122,146.93
  SANTA RITA II MG 230 kV SANTA RITA II MG1 PB RB FT MG 230 kV SANTA RITA II MG1 PB 017/2009 IPCA RMEL REN 643/2014 28/02/2015 27/02/2030 56,129.52
  SANTA RITA II TR 230/69 kV SANTA RITA II TR1 PB RBF FT TR 230/69 kV SANTA RITA II TR1 PB 017/2009 IPCA RBL CC 017/2009 30/01/2021 8/3/2039 1,443,636.84
  SANTA RITA II TR 230/69 kV SANTA RITA II TR2 PB RBF FT TR 230/69 kV SANTA RITA II TR2 PB 017/2009 IPCA RBL CC 017/2009 30/01/2021 8/3/2039 1,443,636.84
  SANTA RITA II TR 230/69 kV SANTA RITA II TR3 PB RBF FT TR 230/69 kV SANTA RITA II TR3 PB 017/2009 IPCA RBNI REA 3892/2013 22/02/2016 22/02/2051 990,726.95
  SANTA RITA II TT 69/0 kV SANTA RITA II TT1 PB DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 65,936.82
  SANTA RITA II TT 69/0 kV SANTA RITA II TT2 PB DIT   017/2009 IPCA RCDM REA 4347/2013 5/8/2017 5/7/2047 161,686.27
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/12/2040 488,193.71
  SAO LUIS III EL 230 kV SAO LUIS III LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA 004/2010 IPCA RBL CC 004/2010 7/12/2010 7/12/2040 488,193.71
  SAPEACU EL 230 kV SAPEACU LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  SAPEACU EL 230 kV SAPEACU LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  SAPEACU EL 230 kV SAPEACU LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  SAPEACU EL 230 kV SAPEACU LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  SAPEACU EL 230 kV SAPEACU LT 230 kV SAPEACU /STO.A.JESUS C-1 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  SAPEACU EL 230 kV SAPEACU LT 230 kV SAPEACU /STO.A.JESUS C-2 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  SAPEACU MG 500 kV SAPEACU MG5 BA RB FT MG 500 kV SAPEACU MG5 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2013 19/12/2047 35,336.24
  SOBRAL II BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  SOBRAL II BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE 061/2001 IPCA RMEL REN 643/2014 10/3/2014 10/2/2028 91,778.65
  SOBRAL II BC 13,8 kV 3,6 MVAr SOBRAL II BC4 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  SOBRAL II BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,292.77
  SOBRAL II BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE 061/2001 IPCA RMEL REN 643/2014 10/3/2014 10/2/2028 45,889.34
  SOBRAL II BC 69 kV 24,4 Mvar SOBRAL II BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 109,673.76
  SOBRAL II BC 69 kV 24,4 Mvar SOBRAL II BC2 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 109,673.76
  SOBRAL II EL 230 kV SOBRAL II LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  SOBRAL II EL 230 kV SOBRAL II LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBNI REA 2460/2010 21/11/2013 20/11/2044 675,041.84
  SOBRAL II EL 230 kV SOBRAL II LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RMEL REN 643/2014 16/03/2014 15/03/2042 41,414.62
  SOBRAL II EL 230 kV SOBRAL II LT 230 kV IBIAPINA II /SOBRAL II C-1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  SOBRAL II EL 230 kV SOBRAL II LT 230 kV SOBRAL II /SOBRAL III C-1 CE RB FT LT 230 kV SOBRAL II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  SOBRAL II EL 230 kV SOBRAL II LT 230 kV SOBRAL II /SOBRAL III C-2 CE RB FT LT 230 kV SOBRAL II /SOBRAL III C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  SOBRAL II EL 69 kV SOBRAL II  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  SOBRAL II EL 69 kV SOBRAL II  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  SOBRAL II EL 69 kV SOBRAL II  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  SOBRAL II EL 69 kV SOBRAL II  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  SOBRAL II EL 69 kV SOBRAL II  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  SOBRAL II EL 69 kV SOBRAL II  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  SOBRAL II EL 69 kV SOBRAL II  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  SOBRAL II EL 69 kV SOBRAL II  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  SOBRAL II EL 69 kV SOBRAL II  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  SOBRAL II EL 69 kV SOBRAL II  DIST4 DIT   061/2001 IPCA RMEL REN 443/2011 8/7/2016 8/6/2039 4,201.06
  SOBRAL II EL 69 kV SOBRAL II  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  SOBRAL II EL 69 kV SOBRAL II  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  SOBRAL II EL 69 kV SOBRAL II  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  SOBRAL II EL 69 kV SOBRAL II  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  SOBRAL II EL 69 kV SOBRAL II  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  SOBRAL II EL 69 kV SOBRAL II  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  SOBRAL II EL 69 kV SOBRAL II  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  SOBRAL II EL 69 kV SOBRAL II  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  SOBRAL II IB 230 kV MG 230 kV SOBRAL II MG1 CE IB1 RB FT MG 230 kV SOBRAL II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  SOBRAL II IB 69 kV MG 230 kV SOBRAL II MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  SOBRAL II MC 13,8 kV BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  SOBRAL II MC 13,8 kV BC 13,8 kV 3,6 MVAr SOBRAL II BC4 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  SOBRAL II MC 13,8 kV BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,287.09
  SOBRAL II MC 13,8 kV TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  SOBRAL II MC 13,8 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  SOBRAL II MC 230 kV RTL 230 kV 10 MVAr SOBRAL II RT1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  SOBRAL II MC 230 kV RTL 230 kV 10 Mvar SOBRAL II RT2 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  SOBRAL II MC 230 kV TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  SOBRAL II MC 230 kV TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39
  SOBRAL II MC 230 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  SOBRAL II MC 230 kV TR 230/69 kV SOBRAL II TR3 CE RBF FT TR 230/69 kV SOBRAL II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  SOBRAL II MC 230 kV TR 230/69 kV SOBRAL II TR4 CE RBF FT TR 230/69 kV SOBRAL II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 31/03/2014 30/03/2044 969,690.93
  SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC1 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC1 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC2 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC2 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC2 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2045 6,247.83
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2045 6,247.83
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2045 6,247.83
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR3 CE RBF FT TR 230/69 kV SOBRAL II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR4 CE RBF FT TR 230/69 kV SOBRAL II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 31/03/2014 30/03/2044 377,957.66
  SOBRAL II MC 69 kV TT 69/13,8 kV SOBRAL II TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  SOBRAL II MC 69 kV TT 69/13,8 kV SOBRAL II TA2 CE DIT   061/2001 IPCA RCDM REA 2412/2010 27/06/2012 26/06/2043 265,634.54
  SOBRAL II MG 230 kV SOBRAL II MG1 CE RB FT MG 230 kV SOBRAL II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 532,332.44
  SOBRAL II MG 230 kV SOBRAL II MG1 CE RB FT MG 230 kV SOBRAL II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 504,813.45
  SOBRAL II MG 230 kV SOBRAL II MG1 CE RB FT MG 230 kV SOBRAL II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,633,674.82
  SOBRAL II RTL 230 kV 10 MVAr SOBRAL II RT1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  SOBRAL II RTL 230 kV 10 Mvar SOBRAL II RT2 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  SOBRAL II RTL 230 kV 3,33 Mvar SOBRAL II RTR1 CE RB FT RTL 230 kV 3,33 Mvar SOBRAL II RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,047.53
  SOBRAL II TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  SOBRAL II TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  SOBRAL II TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  SOBRAL II TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  SOBRAL II TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  SOBRAL II TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  SOBRAL II TR 230/69 kV SOBRAL II TR3 CE RBF FT TR 230/69 kV SOBRAL II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  SOBRAL II TR 230/69 kV SOBRAL II TR4 CE RBF FT TR 230/69 kV SOBRAL II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 31/03/2014 30/03/2048 1,261,425.96
  SOBRAL II TT 69/13,8 kV SOBRAL II TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  SOBRAL II TT 69/13,8 kV SOBRAL II TA1 CE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  SOBRAL II TT 69/13,8 kV SOBRAL II TA2 CE DIT   061/2001 IPCA RCDM REA 2412/2010 27/06/2012 26/06/2042 246,651.13
  SOBRAL III EL 230 kV SOBRAL III LT 230 kV SOBRAL II /SOBRAL III C-1 CE RB FT LT 230 kV SOBRAL II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  SOBRAL III EL 230 kV SOBRAL III LT 230 kV SOBRAL II /SOBRAL III C-2 CE RB FT LT 230 kV SOBRAL II /SOBRAL III C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  SOBRAL III EL 230 kV SOBRAL III LT 230 kV SOBRAL III /ACARAU II C-1 CE RB FT LT 230 kV SOBRAL III /ACARAU II C-1 CE 021/2010 IPCA RBL CC 021/2010 4/8/2014 23/11/2040 421,182.00
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046 47,617.06
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,322,567.42
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RMEL REN 643/2014 3/5/2013 3/4/2043 14,566.00
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046 31,744.70

 

96 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  SOBRAL III EL 500 kV SOBRAL III LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,322,567.42
  SOBRAL III IB 230 kV MG 500 kV SOBRAL III MG1 CE IB1 RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  SOBRAL III IB 500 kV MG 500 kV SOBRAL III MG1 CE IB1 RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046 47,617.06
  SOBRAL III IB 500 kV MG 500 kV SOBRAL III MG1 CE IB1 RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  SOBRAL III IB 500 kV MG 500 kV SOBRAL III MG1 CE IB1 RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  SOBRAL III IB 500 kV MG 500 kV SOBRAL III MG1 CE IB1 RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  SOBRAL III MC 230 kV TR 500/230 kV SOBRAL III TR1 CE RB FT TR 500/230 kV SOBRAL III TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  SOBRAL III MC 230 kV TR 500/230 kV SOBRAL III TR2 CE RB FT TR 500/230 kV SOBRAL III TR2 CE 061/2001 IPCA RBNI REA 2181/2009 21/09/2012 20/09/2042 976,094.78
  SOBRAL III MC 500 kV RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046 47,617.06
  SOBRAL III MC 500 kV RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  SOBRAL III MC 500 kV RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  SOBRAL III MC 500 kV RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046 47,617.06
  SOBRAL III MC 500 kV TR 500/230 kV SOBRAL III TR1 CE RB FT TR 500/230 kV SOBRAL III TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  SOBRAL III MC 500 kV TR 500/230 kV SOBRAL III TR2 CE RB FT TR 500/230 kV SOBRAL III TR2 CE 061/2001 IPCA RBNI REA 2181/2009 21/09/2012 20/09/2043 1,584,626.53
  SOBRAL III MG 500 kV SOBRAL III MG1 CE RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RMEL REN 643/2014 30/01/2014 29/01/2031 23,112.54
  SOBRAL III MG 500 kV SOBRAL III MG1 CE RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RMEL REN 643/2014 8/1/2014 31/07/2031 25,631.26
  SOBRAL III MG 500 kV SOBRAL III MG1 CE RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 985,625.73
  SOBRAL III MG 500 kV SOBRAL III MG1 CE RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 934,673.70
  SOBRAL III MG 500 kV SOBRAL III MG1 CE RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,024,786.44
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 707,153.50
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 670,597.12
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,170,183.11
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RMEL REN 643/2014 27/01/2014 26/01/2049 37,169.31
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RMEL REN 643/2014 26/01/2014 25/01/2049 27,875.08
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 707,153.50
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 670,597.12
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,170,183.11
  SOBRAL III RTL 500 kV 60 Mvar SOBRAL III RTR1 CE RB FT RTL 500 kV 60 Mvar SOBRAL III RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,420.05
  SOBRAL III RTL 500 kV 60 Mvar SOBRAL III RTR1 CE RB FT RTL 500 kV 60 Mvar SOBRAL III RTR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 237,474.56
  SOBRAL III RTL 500 kV 60 Mvar SOBRAL III RTR1 CE RB FT RTL 500 kV 60 Mvar SOBRAL III RTR1 CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 768,514.00
  SOBRAL III TR 500/230 kV SOBRAL III TR1 CE RB FT TR 500/230 kV SOBRAL III TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,713,580.77
  SOBRAL III TR 500/230 kV SOBRAL III TR2 CE RB FT TR 500/230 kV SOBRAL III TR2 CE 061/2001 IPCA RBNI REA 2181/2009 21/09/2012 20/09/2047 4,481,901.52
  SR.BONFIM II EL 138 kV SR.BONFIM II  JACOBINA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,325.54
  SR.BONFIM II EL 138 kV SR.BONFIM II  QUEIMADAII-03S2 DIT   061/2001 IPCA RCDM REA 2837/2011 15/12/2015 14/12/2045 858,383.74
  SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2038 99,360.92
  SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 6/9/2016 6/8/2031 103,520.74
  SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 6/9/2016 6/8/2044 24,884.84
  SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV SR.BONFIM II /SE CAMPO FORMOSO C-1 BA RB FT LT 230 kV SR.BONFIM II /SE CAMPO FORMOSO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV SR.BONFIM II /SE CAMPO FORMOSO C-1 BA RB FT LT 230 kV SR.BONFIM II /SE CAMPO FORMOSO C-1 BA 061/2001 IPCA RMEL REN 443/2011 23/08/2015 22/08/2045 12,244.15
  SR.BONFIM II EL 69 kV SR.BONFIM II  BONFIM DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  SR.BONFIM II EL 69 kV SR.BONFIM II  CIA, CIMENT BRA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  SR.BONFIM II EL 69 kV SR.BONFIM II  ITIUBA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  SR.BONFIM II EL 69 kV SR.BONFIM II  JACOBINA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  SR.BONFIM II EL 69 kV SR.BONFIM II  JACOB-PEDRINHAS DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  SR.BONFIM II IB 138 kV MG 230 kV SR.BONFIM II MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,407.76
  SR.BONFIM II IB 230 kV MG 230 kV SR.BONFIM II MG1 BA IB1 RB FT MG 230 kV SR.BONFIM II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  SR.BONFIM II IB 69 kV MG 230 kV SR.BONFIM II MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  SR.BONFIM II MC 138 kV TR 230/138 kV SR.BONFIM II TR3 BA RBF FT TR 230/138 kV SR.BONFIM II TR3 BA 061/2001 IPCA RBNI REA 6059/2016 29/07/2018 29/07/2039 1,349,742.96
  SR.BONFIM II MC 138 kV TR 230/138 kV SR.BONFIM II TR4 BA RBF FT TR 230/138 kV SR.BONFIM II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,124.94
  SR.BONFIM II MC 138 kV TR 230/138 kV SR.BONFIM II TR6 BA RBF FT TR 230/138 kV SR.BONFIM II TR6 BA 061/2001 IPCA RBNI REA 3208/2011 23/11/2015 22/11/2045 816,416.57
  SR.BONFIM II MC 230 kV TR 230/138 kV SR.BONFIM II TR3 BA RBF FT TR 230/69 kV SR.BONFIM II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  SR.BONFIM II MC 230 kV TR 230/138 kV SR.BONFIM II TR3 BA RBF FT TR 230/69 kV SR.BONFIM II TR2 BA 061/2001 IPCA RBNI REA 6059/2016 29/07/2018 29/07/2042 582,955.86
  SR.BONFIM II MC 230 kV TR 230/138 kV SR.BONFIM II TR4 BA RBF FT TR 230/138 kV SR.BONFIM II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  SR.BONFIM II MC 230 kV TR 230/138 kV SR.BONFIM II TR6 BA RBF FT TR 230/138 kV SR.BONFIM II TR6 BA 061/2001 IPCA RBNI REA 3208/2011 23/11/2015 22/11/2046 1,145,418.47
  SR.BONFIM II MC 230 kV TR 230/69 kV SR.BONFIM II TR1 BA RBF FT TR 230/69 kV SR.BONFIM II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  SR.BONFIM II MC 230 kV TR 230/69 kV SR.BONFIM II TR3 BA RBF FT TR 230/69 kV SR.BONFIM II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  SR.BONFIM II MC 69 kV TR 230/69 kV SR.BONFIM II TR1 BA RBF FT TR 230/69 kV SR.BONFIM II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  SR.BONFIM II MC 69 kV TR 230/69 kV SR.BONFIM II TR3 BA RBF FT TR 230/69 kV SR.BONFIM II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  SR.BONFIM II MG 230 kV SR.BONFIM II MG1 BA RB FT MG 230 kV SR.BONFIM II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 565,086.46
  SR.BONFIM II MG 230 kV SR.BONFIM II MG1 BA RB FT MG 230 kV SR.BONFIM II MG1 BA 061/2001 IPCA RBNI REA 6059/2016 29/07/2018 29/07/2049 33,236.64
  SR.BONFIM II MG 230 kV SR.BONFIM II MG1 BA RB FT MG 230 kV SR.BONFIM II MG1 BA 061/2001 IPCA RBNI REA 2837/2011 15/12/2015 14/12/2043 115,470.33
  SR.BONFIM II RTS 69 kV 40 MVAr SR.BONFIM II RT1 BA RBF FT TR 230/69 kV SR.BONFIM II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,319.34
  SR.BONFIM II RTS 69 kV 40 MVAr SR.BONFIM II RT2 BA RBF FT TR 230/69 kV SR.BONFIM II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,319.34
  SR.BONFIM II TR 230/138 kV SR.BONFIM II TR3 BA RBF FT TR 230/138 kV SR.BONFIM II TR3 BA 061/2001 IPCA RBNI REA 6059/2016 29/07/2018 29/07/2052 1,360,430.80
  SR.BONFIM II TR 230/138 kV SR.BONFIM II TR4 BA RBF FT TR 230/138 kV SR.BONFIM II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,278.01
  SR.BONFIM II TR 230/138 kV SR.BONFIM II TR6 BA RBF FT TR 230/138 kV SR.BONFIM II TR6 BA 061/2001 IPCA RBNI REA 3208/2011 23/11/2015 22/11/2049 1,315,433.56
  SR.BONFIM II TR 230/69 kV SR.BONFIM II TR1 BA RBF FT TR 230/69 kV SR.BONFIM II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  SR.BONFIM II TR 230/69 kV SR.BONFIM II TR3 BA RBF FT TR 230/69 kV SR.BONFIM II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  SR.BONFIM II TT 69/0 kV SR.BONFIM II TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  SR.BONFIM II TT 69/13,8 kV SR.BONFIM II TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV SAPEACU /STO.A.JESUS C-1 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV SAPEACU /STO.A.JESUS C-1 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV SAPEACU /STO.A.JESUS C-1 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV SAPEACU /STO.A.JESUS C-2 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2031 103,531.43
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 599,023.62
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  STO.A.JESUS IB 230 kV MG 230 kV STO.A.JESUS MG1 BA IB1 RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,296.09
  STO.A.JESUS IB 230 kV MG 230 kV STO.A.JESUS MG1 BA IB1 RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 100,801.10
  STO.A.JESUS IB 230 kV MG 230 kV STO.A.JESUS MG1 BA IB1 RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 326,212.02
  STO.A.JESUS IB 69 kV MG 230 kV STO.A.JESUS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  STO.A.JESUS IB 69 kV MG 230 kV STO.A.JESUS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40
  STO.A.JESUS IB 69 kV MG 230 kV STO.A.JESUS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  STO.A.JESUS MC 230 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  STO.A.JESUS MC 230 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 127,364.39

 

97 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

  STO.A.JESUS MC 230 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 412,176.03
  STO.A.JESUS MC 230 kV TR 230/69 kV STO.A.JESUS TR2 BA RBF FT TR 230/69 kV STO.A.JESUS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,307.43
  STO.A.JESUS MC 230 kV TR 230/69 kV STO.A.JESUS TR3 BA RBF FT TR 230/69 kV STO.A.JESUS TR3 BA 061/2001 IPCA RBNI REA 3208/2011 11/9/2015 11/8/2045 1,008,399.74
  STO.A.JESUS MC 69 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  STO.A.JESUS MC 69 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  STO.A.JESUS MC 69 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  STO.A.JESUS MC 69 kV TR 230/69 kV STO.A.JESUS TR2 BA RBF FT TR 230/69 kV STO.A.JESUS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  STO.A.JESUS MC 69 kV TR 230/69 kV STO.A.JESUS TR3 BA RBF FT TR 230/69 kV STO.A.JESUS TR3 BA 061/2001 IPCA RBNI REA 3208/2011 11/9/2015 11/8/2045 393,091.30
  STO.A.JESUS MC 69 kV TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  STO.A.JESUS MC 69 kV TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  STO.A.JESUS MC 69 kV TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  STO.A.JESUS MC 69 kV TT 69/13,8 kV STO.A.JESUS TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  STO.A.JESUS MG 230 kV STO.A.JESUS MG1 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 485,683.62
  STO.A.JESUS MG 230 kV STO.A.JESUS MG1 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 460,576.15
  STO.A.JESUS MG 230 kV STO.A.JESUS MG1 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,490,514.27
  STO.A.JESUS MG 230 kV STO.A.JESUS MG1 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RMEL REN 643/2014 2/7/2014 2/6/2048 5,723.39
  STO.A.JESUS TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  STO.A.JESUS TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  STO.A.JESUS TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  STO.A.JESUS TR 230/69 kV STO.A.JESUS TR2 BA RBF FT TR 230/69 kV STO.A.JESUS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  STO.A.JESUS TR 230/69 kV STO.A.JESUS TR3 BA RBF FT TR 230/69 kV STO.A.JESUS TR3 BA 061/2001 IPCA RBNI REA 3208/2011 11/9/2015 11/8/2049 1,306,879.24
  STO.A.JESUS TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  STO.A.JESUS TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  STO.A.JESUS TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  STO.A.JESUS TT 69/13,8 kV STO.A.JESUS TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  STO.A.JESUS TT 69/13,8 kV STO.A.JESUS TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  STO.A.JESUS TT 69/13,8 kV STO.A.JESUS TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  SUAPE II EL 230 kV SUAPE II LT 230 kV PIRAPAMA II /SUAPE II C-1 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 272,721.99
  SUAPE II EL 230 kV SUAPE II LT 230 kV PIRAPAMA II /SUAPE II C-2 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 272,721.99
  SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /RNEST PETROBRAS C-1 PE DIT   006/2009 IPCA RCDM REN 443/2011 7/7/2015 7/6/2043 715,010.36
  SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /RNEST PETROBRAS C-2 PE DIT   006/2009 IPCA RCDM REN 443/2011 7/7/2015 7/6/2043 715,010.36
  SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /SUAPE III C-1 PE RB FT LT 230 kV SUAPE II /SUAPE III C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 272,721.99
  SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /SUAPE III C-1 PE RB FT LT 230 kV SUAPE II /SUAPE III C-1 PE 006/2009 IPCA RBNI REA 5861/2016 12/10/2018 12/9/2033 46,383.83
  SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /SUAPE III C-2 PE RB FT LT 230 kV SUAPE II /SUAPE III C-2 PE 006/2009 IPCA RBNI REA 5861/2016 12/10/2018 12/9/2033 46,383.83
  SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /SUAPE III C-2 PE RB FT LT 230 kV SUAPE II /SUAPE III C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 272,721.99
  SUAPE II EL 500 kV SUAPE II LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBNI REA 10229/2021 21/05/2021 21/05/2049 164,402.66
  SUAPE II EL 500 kV SUAPE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 10229/2021 21/05/2021 21/05/2049 164,694.41
  SUAPE II IB 230 kV MG 500 kV SUAPE II MG1 PE IB1 RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 130,863.75
  SUAPE II IB 500 kV MG 500 kV SUAPE II MG1 PE IB1 RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 217,598.66
  SUAPE II IB 500 kV MG 500 kV SUAPE II MG1 PE IB2 RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 217,598.66
  SUAPE II MC 230 kV TR 500/230 kV SUAPE II TR1 PE RB FT TR 500/230 kV SUAPE II TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 236,666.66
  SUAPE II MC 230 kV TR 500/230 kV SUAPE II TR2 PE RB FT TR 500/230 kV SUAPE II TR2 PE 006/2009 IPCA RBNI REA 3237/2011 23/02/2015 23/02/2049 405,113.71
  SUAPE II MC 500 kV RTL 500 kV 100 Mvar SUAPE II RT1 PE RB FT RTL 500 kV 100 Mvar SUAPE II RT1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 501,480.05
  SUAPE II MC 500 kV TR 500/230 kV SUAPE II TR1 PE RB FT TR 500/230 kV SUAPE II TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 564,748.82
  SUAPE II MC 500 kV TR 500/230 kV SUAPE II TR2 PE RB FT TR 500/230 kV SUAPE II TR2 PE 006/2009 IPCA RBNI REA 3237/2011 23/02/2015 23/02/2048 1,063,880.16
  SUAPE II MG 500 kV SUAPE II MG1 PE RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBNI REA 3237/2011 23/02/2015 23/02/2049 44,434.53
  SUAPE II MG 500 kV SUAPE II MG1 PE RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RMEL REN 643/2014 27/03/2015 26/03/2030 43,625.27
  SUAPE II MG 500 kV SUAPE II MG1 PE RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBNI REN 443/2011 7/7/2015 7/6/2046 103,411.48
  SUAPE II MG 500 kV SUAPE II MG1 PE RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBNI REN 443/2011 7/7/2015 7/6/2046 103,411.48
  SUAPE II MG 500 kV SUAPE II MG1 PE RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 2,223,371.50
  SUAPE II RTL 500 kV 100 Mvar SUAPE II RT1 PE RB FT RTL 500 kV 100 Mvar SUAPE II RT1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 650,355.68
  SUAPE II RTL 500 kV 33,33 Mvar SUAPE II RTR1 PE RB FT RTL 500 kV 33,33 Mvar SUAPE II RTR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 216,784.64
  SUAPE II TR 500/230 kV SUAPE II TR1 PE RB FT TR 500/230 kV SUAPE II TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 1,762,118.62
  SUAPE II TR 500/230 kV SUAPE II TR2 PE RB FT TR 500/230 kV SUAPE II TR2 PE 006/2009 IPCA RBNI REA 3237/2011 23/02/2015 23/02/2055 4,723,607.48
  SUAPE II TR 500/230 kV SUAPE II TRR1 PE RB FT TR 500/230 kV SUAPE II TRR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 587,372.87
  SUAPE III EL 230 kV SUAPE III LT 230 kV SUAPE II /SUAPE III C-1 PE RB FT LT 230 kV SUAPE II /SUAPE III C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 272,721.99
  SUAPE III EL 230 kV SUAPE III LT 230 kV SUAPE II /SUAPE III C-2 PE RB FT LT 230 kV SUAPE II /SUAPE III C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 272,721.99
  SUAPE III EL 69 kV SUAPE III  DIST1 DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039 20,950.72
  SUAPE III EL 69 kV SUAPE III  DIST2 DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039 20,950.72
  SUAPE III EL 69 kV SUAPE III  DIST3 DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039 20,950.72
  SUAPE III EL 69 kV SUAPE III  DIST4 DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039 20,950.72
  SUAPE III IB 230 kV MG 230 kV SUAPE III MG1 PE IB1 RB FT MG 230 kV SUAPE III MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 130,863.75
  SUAPE III IB 69 kV MG 230 kV SUAPE III MG1 PE IB1 DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039 9,966.64
  SUAPE III MC 230 kV TR 230/69 kV SUAPE III TR1 PE RBF FT TR 230/69 kV SUAPE III TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 236,666.66
  SUAPE III MC 230 kV TR 230/69 kV SUAPE III TR2 PE RBF FT TR 230/69 kV SUAPE III TR2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 236,666.66
  SUAPE III MC 230 kV TR 230/69 kV SUAPE III TR3 PE RBF FT TR 230/69 kV SUAPE III TR3 PE 006/2009 IPCA RBNI REA 3237/2011 18/05/2015 18/05/2049 405,306.90
  SUAPE III MC 69 kV TR 230/69 kV SUAPE III TR1 PE RBF FT TR 230/69 kV SUAPE III TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 43,253.42
  SUAPE III MC 69 kV TR 230/69 kV SUAPE III TR2 PE RBF FT TR 230/69 kV SUAPE III TR2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 43,253.42
  SUAPE III MC 69 kV TR 230/69 kV SUAPE III TR3 PE RBF FT TR 230/69 kV SUAPE III TR3 PE 006/2009 IPCA RBNI REA 3237/2011 18/05/2015 18/05/2049 166,780.94
  SUAPE III MG 230 kV SUAPE III MG1 PE RB FT MG 230 kV SUAPE III MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 1,364,532.75
  SUAPE III MG 230 kV SUAPE III MG1 PE RB FT MG 230 kV SUAPE III MG1 PE 006/2009 IPCA RBNI REA 4347/2013 30/10/2017 29/10/2049 129,744.45
  SUAPE III MG 230 kV SUAPE III MG1 PE RB FT MG 230 kV SUAPE III MG1 PE 006/2009 IPCA RBNI REA 3237/2011 18/05/2015 18/05/2047 44,449.94
  SUAPE III MG 230 kV SUAPE III MG1 PE RB FT MG 230 kV SUAPE III MG1 PE 006/2009 IPCA RBNI REA 3237/2011 18/05/2015 18/05/2047 11,722.58
  SUAPE III TR 230/69 kV SUAPE III TR1 PE RBF FT TR 230/69 kV SUAPE III TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 340,641.53
  SUAPE III TR 230/69 kV SUAPE III TR2 PE RBF FT TR 230/69 kV SUAPE III TR2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 340,641.53
  SUAPE III TR 230/69 kV SUAPE III TR3 PE RBF FT TR 230/69 kV SUAPE III TR3 PE 006/2009 IPCA RBNI REA 3237/2011 18/05/2015 18/05/2055 904,406.97
  SUAPE III TT 69/0 kV SUAPE III TA1 PE DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039 60,328.67
  SUAPE III TT 69/0 kV SUAPE III TA2 PE DIT   006/2009 IPCA RCDM REA 4347/2013 30/10/2017 29/10/2047 428,001.15
  Tabocas do Brejo Velho EL 230 kV Tabocas do Brejo Velho LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA RB FT LT 230 kV B.JESUS LAPA /Tabocas do Brejo Velho C-1 BA 061/2001 IPCA RBNI REA 10198/2021 19/06/2019 18/06/2047 131,990.95
  Tabocas do Brejo Velho EL 230 kV Tabocas do Brejo Velho LT 230 kV Tabocas do Brejo Velho /BARREIRAS II C-1 BA RB FT LT 230 kV Tabocas do Brejo Velho /BARREIRAS II C-1 BA 061/2001 IPCA RBNI REA 10198/2021 6/5/2019 6/4/2047 131,990.95
  Tabocas do Brejo Velho IB 230 kV MG 230 kV Tabocas do Brejo Velho MG1 BA IB1 RB FT MG 230 kV Tabocas do Brejo Velho MG1 BA 061/2001 IPCA RBNI REA 10198/2021 6/5/2019 6/4/2048 93,256.27
  Tabocas do Brejo Velho MG 230 kV Tabocas do Brejo Velho MG1 BA RB FT MG 230 kV Tabocas do Brejo Velho MG1 BA 061/2001 IPCA RBNI REA 10198/2021 6/5/2019 6/4/2037 45,756.92
  Tabocas do Brejo Velho MG 230 kV Tabocas do Brejo Velho MG1 BA RB FT MG 230 kV Tabocas do Brejo Velho MG1 BA 061/2001 IPCA RBNI REA 10198/2021 6/5/2019 6/4/2050 48,746.52
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RMEL REN 443/2011 14/04/2016 13/04/2046 12,466.45
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  TACAIMBO EL 69 kV TACAIMBO  BELO JARDIM C2 DIT   061/2001 IPCA RCDM REA 1814/2009 13/04/2015 4/12/2045 416,640.51
  TACAIMBO EL 69 kV TACAIMBO  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TACAIMBO EL 69 kV TACAIMBO  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TACAIMBO EL 69 kV TACAIMBO  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TACAIMBO EL 69 kV TACAIMBO  DIST3 DIT   061/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2046 32,388.93
  TACAIMBO EL 69 kV TACAIMBO  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TACAIMBO EL 69 kV TACAIMBO  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  TACAIMBO EL 69 kV TACAIMBO  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  TACAIMBO EL 69 kV TACAIMBO  SAO CAETANO DIT   061/2001 IPCA RCDM REA 1814/2009 13/04/2015 4/12/2045 416,640.51
  TACAIMBO IB 230 kV MG 230 kV TACAIMBO MG1 PE IB1 RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  TACAIMBO IB 69 kV MG 230 kV TACAIMBO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  TACAIMBO IB 69 kV MG 230 kV TACAIMBO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 37,645.40

 

98 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

  TACAIMBO IB 69 kV MG 230 kV TACAIMBO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 117,662.44
  TACAIMBO MC 230 kV TR 230/69 kV TACAIMBO TR1 PE RBF FT TR 230/69 kV TACAIMBO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  TACAIMBO MC 230 kV TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  TACAIMBO MC 230 kV TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  TACAIMBO MC 230 kV TR 230/69 kV TACAIMBO TR3 PE RBF FT TR 230/69 kV TACAIMBO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  TACAIMBO MC 230 kV TR 230/69 kV TACAIMBO TR4 PE RBF FT TR 230/69 kV TACAIMBO TR4 PE 061/2001 IPCA RBNI REA 5655/2016 14/10/2018 14/10/2042 662,601.56
  TACAIMBO MC 69 kV TR 230/69 kV TACAIMBO TR1 PE RBF FT TR 230/69 kV TACAIMBO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  TACAIMBO MC 69 kV TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  TACAIMBO MC 69 kV TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  TACAIMBO MC 69 kV TR 230/69 kV TACAIMBO TR3 PE RBF FT TR 230/69 kV TACAIMBO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  TACAIMBO MC 69 kV TR 230/69 kV TACAIMBO TR4 PE RBF FT TR 230/69 kV TACAIMBO TR4 PE 061/2001 IPCA RBNI REA 5655/2016 14/10/2018 14/10/2041 282,251.27
  TACAIMBO MC 69 kV TR 69/13,8 kV TACAIMBO TR5 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  TACAIMBO MC 69 kV TT 69/13,8 kV TACAIMBO TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 519,524.66
  TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 492,667.77
  TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,594,369.02
  TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBNI REA 5655/2016 14/10/2018 14/10/2050 61,963.11
  TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBNI REA 5655/2016 14/10/2018 14/10/2049 16,298.87
  TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/10/2013 29/10/2041 71,220.29
  TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBNI REA 1814/2009 13/04/2015 4/12/2043 51,115.09
  TACAIMBO TR 230/69 kV TACAIMBO TR1 PE RBF FT TR 230/69 kV TACAIMBO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  TACAIMBO TR 230/69 kV TACAIMBO TR1 PE RBF FT TR 230/69 kV TACAIMBO TR1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  TACAIMBO TR 230/69 kV TACAIMBO TR1 PE RBF FT TR 230/69 kV TACAIMBO TR1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  TACAIMBO TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  TACAIMBO TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  TACAIMBO TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  TACAIMBO TR 230/69 kV TACAIMBO TR3 PE RBF FT TR 230/69 kV TACAIMBO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  TACAIMBO TR 230/69 kV TACAIMBO TR4 PE RBF FT TR 230/69 kV TACAIMBO TR4 PE 061/2001 IPCA RBNI REA 5655/2016 14/10/2018 14/10/2052 1,429,387.15
  TACAIMBO TR 69/13,8 kV TACAIMBO TR5 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 25,004.86
  TACAIMBO TR 69/13,8 kV TACAIMBO TR5 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 23,712.23
  TACAIMBO TR 69/13,8 kV TACAIMBO TR5 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,737.41
  TACAIMBO TT 69/13,8 kV TACAIMBO TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  TACAIMBO TT 69/13,8 kV TACAIMBO TA1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  TACAIMBO TT 69/13,8 kV TACAIMBO TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  TACARUTU EL 230 kV TACARUTU LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RBNI REA 7026/2018 7/1/2018 14/12/2038 109,055.24
  TACARUTU EL 230 kV TACARUTU LT 230 kV TACARUTU /BOM NOME C-1 PE RB FT LT 230 kV TACARUTU /BOM NOME C-1 PE 061/2001 IPCA RBNI REA 7026/2018 7/1/2018 14/12/2038 109,055.24
  TACARUTU IB 230 kV MG 230 kV TACARUTU MG1 PE IB1 RB FT MG 230 kV TACARUTU MG1 PE 061/2001 IPCA RBNI REA 7026/2018 7/1/2018 14/12/2039 66,101.68
  TACARUTU MG 230 kV TACARUTU MG1 PE RB FT MG 230 kV TACARUTU MG1 PE 061/2001 IPCA RBNI REA 7026/2018 7/1/2018 14/12/2033 41,447.02
  TAUA II CE 90/-45 Mvar TAUA II CE1 CE RB FT CE 90/-45 Mvar TAUA II CE1 CE 007/2005 IGPM RBNI REA 3402/2012 15/12/2016 15/12/2046 9,195,742.28
  TAUA II EL 230 kV TAUA II LT 230 kV MILAGRES /TAUA II C-1 CE RB FT LT 230 kV MILAGRES /TAUA II C-1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 3/4/2035 1,103,650.76
  TAUA II EL 230 kV TAUA II LT 230 kV PICOS /TAUA II C-1 PI/CE RB FT LT 230 kV PICOS /TAUA II C-1 PI/CE 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 412,952.82
  TAUA II EL 69 kV TAUA II  DIST1 DIT   007/2005 IGPM RCDM REA 758/2006 27/02/2008 27/02/2038 429,576.52
  TAUA II EL 69 kV TAUA II  DIST2 DIT   007/2005 IGPM RCDM REA 758/2006 27/02/2008 27/02/2038 429,576.52
  TAUA II EL 69 kV TAUA II  DIST3 DIT   007/2005 IGPM RCDM REA 758/2006 28/02/2008 28/02/2038 429,569.66
  TAUA II EL 69 kV TAUA II  DIST4 DIT   007/2005 IGPM RCDM REA 758/2006 3/9/2008 3/9/2038 429,501.04
  TAUA II EL 69 kV TAUA II  DIST5 DIT   007/2005 IGPM RCDM REA 758/2006 27/11/2009 27/11/2040 377,849.25
  TAUA II IB 230 kV MG 230 kV TAUA II MG1 CE IB1 RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBNI REA 1179/2008 30/05/2010 30/05/2043 679,289.50
  TAUA II IB 69 kV MG 230 kV TAUA II MG1 CE IB1 DIT   007/2005 IGPM RPEC CC 007/2005 3/4/2005 3/4/2035 111,654.82
  TAUA II MC 230 kV CE 90/-45 Mvar TAUA II CE1 CE RB FT CE 90/-45 Mvar TAUA II CE1 CE 007/2005 IGPM RBNI REA 3402/2012 15/12/2016 15/12/2049 1,056,126.32
  TAUA II MC 230 kV RTB 230 kV 15 Mvar TAUA II RT1 CE RB FT RTB 230 kV 15 Mvar TAUA II RT1 CE 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 312,087.51
  TAUA II MC 230 kV TR 230/69 kV TAUA II TR1 CE RBF FT TR 230/69 kV TAUA II TR1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 3/4/2035 920,223.38
  TAUA II MC 230 kV TR 230/69 kV TAUA II TR2 CE RBF FT TR 230/69 kV TAUA II TR2 CE 007/2005 IGPM RBNI REA 2823/2011 3/2/2015 3/2/2049 1,043,329.87
  TAUA II MC 69 kV TR 230/69 kV TAUA II TR1 CE RBF FT TR 230/69 kV TAUA II TR1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 3/4/2035 209,442.31
  TAUA II MC 69 kV TR 230/69 kV TAUA II TR2 CE RBF FT TR 230/69 kV TAUA II TR2 CE 007/2005 IGPM RBNI REA 2823/2011 3/2/2015 3/2/2049 386,729.32
  TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 3/4/2035 1,147,501.36
  TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBNI REA 1179/2008 30/05/2010 30/05/2043 280,821.76
  TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBNI REA 2376/2010 31/01/2013 31/01/2046 13,369.40
  TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBNI REA 3402/2012 15/12/2016 15/12/2049 161,841.55
  TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RMEL REN 643/2014 25/06/2014 24/06/2046 16,336.50
  TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RMEL REN 643/2014 2/6/2014 4/5/2046 8,660.12
  TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBNI REA 2823/2011 3/2/2015 3/2/2047 160,579.07
  TAUA II RTB 230 kV 15 Mvar TAUA II RT1 CE RB FT RTB 230 kV 15 Mvar TAUA II RT1 CE 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 196,911.74
  TAUA II RTL 230 kV 15 Mvar TAUA II RT2 CE RB FT LT 230 kV MILAGRES /TAUA II C-1 CE 007/2005 IGPM RBNI REA 1179/2008 30/05/2010 30/05/2044 988,249.49
  TAUA II TR 230/69 kV TAUA II TR1 CE RBF FT TR 230/69 kV TAUA II TR1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 3/4/2035 1,471,828.29
  TAUA II TR 230/69 kV TAUA II TR2 CE RBF FT TR 230/69 kV TAUA II TR2 CE 007/2005 IGPM RBNI REA 2823/2011 3/2/2015 3/2/2055 1,545,143.75
  TAUA II TT 69/0 kV TAUA II TT1 CE DIT   007/2005 IGPM RPEC CC 007/2005 3/4/2005 3/4/2035 262,717.24
  TEIX. FREITAS II BC 138 kV 10 Mvar TEIX. FREITAS II BC1 BA DIT   014/2008 IPCA RPEC CC 014/2008 16/10/2008 16/10/2038 65,587.20
  TEIX. FREITAS II EL 138 kV TEIX. FREITAS II  DIST1 DIT   014/2008 IPCA RPEC CC 014/2008 16/10/2008 16/10/2038 102,655.12
  TEIX. FREITAS II EL 138 kV TEIX. FREITAS II  DIST2 DIT   014/2008 IPCA RPEC CC 014/2008 16/10/2008 16/10/2038 102,655.12
  TEIX. FREITAS II EL 230 kV TEIX. FREITAS II LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 247,369.38
  TEIX. FREITAS II EL 230 kV TEIX. FREITAS II LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA 018/2009 IPCA RBL CC 018/2009 8/3/2009 8/3/2039 676,566.43
  TEIX. FREITAS II IB 230 kV MG 230 kV TEIX. FREITAS II MG1 BA IB1 RB FT MG 230 kV TEIX. FREITAS II MG1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 120,539.00
  TEIX. FREITAS II IB 230 kV MG 230 kV TEIX. FREITAS II MG1 BA IB1 DIT   014/2008 IPCA RPEC CC 014/2008 16/10/2008 16/10/2038 51,582.00
  TEIX. FREITAS II MC 138 kV BC 138 kV 10 Mvar TEIX. FREITAS II BC1 BA DIT   014/2008 IPCA RPEC CC 014/2008 16/10/2008 16/10/2038 79,429.49
  TEIX. FREITAS II MC 138 kV TR 230/138 kV TEIX. FREITAS II TR1 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 77,345.51
  TEIX. FREITAS II MC 138 kV TR 230/138 kV TEIX. FREITAS II TR2 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR2 BA 014/2008 IPCA RBNI REA 2823/2011 19/06/2019 19/06/2053 382,527.00
  TEIX. FREITAS II MC 230 kV TR 230/138 kV TEIX. FREITAS II TR1 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 213,581.54
  TEIX. FREITAS II MC 230 kV TR 230/138 kV TEIX. FREITAS II TR2 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR2 BA 014/2008 IPCA RBNI REA 2823/2011 19/06/2019 19/06/2053 481,376.04
  TEIX. FREITAS II MG 230 kV TEIX. FREITAS II MG1 BA RB FT MG 230 kV TEIX. FREITAS II MG1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 858,606.72
  TEIX. FREITAS II MG 230 kV TEIX. FREITAS II MG1 BA RB FT MG 230 kV TEIX. FREITAS II MG1 BA 014/2008 IPCA RBNI REA 2823/2011 19/06/2019 19/06/2051 87,104.02
  TEIX. FREITAS II TR 230/138 kV TEIX. FREITAS II TR1 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 304,950.76
  TEIX. FREITAS II TR 230/138 kV TEIX. FREITAS II TR2 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR2 BA 014/2008 IPCA RBNI REA 2823/2011 19/06/2019 19/06/2059 1,706,660.15
  TEIX. FREITAS II TR 230/138 kV TEIX. FREITAS II TRR1 BA RBF FT TR 230/138 kV TEIX. FREITAS II TRR1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 101,650.78
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC5 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 26,859.07
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC5 PI DIT   061/2001 IPCA RMEL REN 643/2014 23/04/2014 22/04/2028 9,073.11
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC6 PI DIT   061/2001 IPCA RMEL REN 643/2014 26/04/2014 25/04/2028 9,077.18
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC6 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 26,859.07
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC7 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 26,859.07
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC7 PI DIT   061/2001 IPCA RMEL REN 643/2014 27/04/2014 26/04/2028 9,078.54
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC8 PI DIT   061/2001 IPCA RMEL REN 643/2014 28/04/2014 27/04/2028 9,079.90
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC8 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 26,859.07
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC9 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 26,859.07
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC9 PI DIT   061/2001 IPCA RMEL REN 643/2014 30/04/2014 29/04/2028 9,082.61
  TERESINA BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,846.49
  TERESINA BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 166,756.08
  TERESINA BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 539,655.22
  TERESINA BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,846.49
  TERESINA BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 166,756.08
  TERESINA BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 539,655.22
  TERESINA BC 69 kV 21,3 Mvar TERESINA BC3 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 99,586.10
  TERESINA BC 69 kV 21,3 Mvar TERESINA BC3 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,662.17
  TERESINA BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,662.17
  TERESINA BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 99,586.10
  TERESINA BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 311,260.97
  TERESINA EL 13,8 kV TERESINA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  TERESINA EL 13,8 kV TERESINA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  TERESINA EL 13,8 kV TERESINA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 146,831.96
  TERESINA EL 13,8 kV TERESINA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  TERESINA EL 13,8 kV TERESINA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  TERESINA EL 13,8 kV TERESINA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 146,831.96

 

99 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  TERESINA EL 13,8 kV TERESINA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  TERESINA EL 13,8 kV TERESINA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  TERESINA EL 13,8 kV TERESINA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 146,831.96
  TERESINA EL 13,8 kV TERESINA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  TERESINA EL 13,8 kV TERESINA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  TERESINA EL 13,8 kV TERESINA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 146,831.96
  TERESINA EL 13,8 kV TERESINA  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  TERESINA EL 13,8 kV TERESINA  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  TERESINA EL 13,8 kV TERESINA  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 146,831.96
  TERESINA EL 13,8 kV TERESINA  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  TERESINA EL 13,8 kV TERESINA  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  TERESINA EL 13,8 kV TERESINA  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 146,831.96
  TERESINA EL 13,8 kV TERESINA  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,485.63
  TERESINA EL 13,8 kV TERESINA  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 46,978.01
  TERESINA EL 13,8 kV TERESINA  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 146,831.96
  TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RMEL REN 643/2014 31/12/2014 30/12/2042 35,472.27
  TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  TERESINA EL 230 kV TERESINA LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 061/2001 IPCA RMEL REN 643/2014 11/2/2014 11/1/2042 35,296.90
  TERESINA EL 230 kV TERESINA LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  TERESINA EL 230 kV TERESINA LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  TERESINA EL 230 kV TERESINA LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  TERESINA EL 230 kV TERESINA LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  TERESINA EL 230 kV TERESINA LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,571.68
  TERESINA EL 230 kV TERESINA LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 636,144.30
  TERESINA EL 230 kV TERESINA LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RMEL REN 643/2014 16/03/2014 15/03/2042 34,610.30
  TERESINA EL 230 kV TERESINA LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  TERESINA EL 230 kV TERESINA LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  TERESINA EL 230 kV TERESINA LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2042 34,910.50
  TERESINA EL 69 kV TERESINA  DIS10 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TERESINA EL 69 kV TERESINA  DIS10 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  TERESINA EL 69 kV TERESINA  DIS10 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  TERESINA EL 69 kV TERESINA  DIS11 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TERESINA EL 69 kV TERESINA  DIS12 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TERESINA EL 69 kV TERESINA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TERESINA EL 69 kV TERESINA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  TERESINA EL 69 kV TERESINA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TERESINA EL 69 kV TERESINA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  TERESINA EL 69 kV TERESINA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  TERESINA EL 69 kV TERESINA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TERESINA EL 69 kV TERESINA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  TERESINA EL 69 kV TERESINA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  TERESINA EL 69 kV TERESINA  DIST3 DIT   061/2001 IPCA RMEL REN 443/2011 31/01/2016 30/01/2039 6,193.06
  TERESINA EL 69 kV TERESINA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TERESINA EL 69 kV TERESINA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  TERESINA EL 69 kV TERESINA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  TERESINA EL 69 kV TERESINA  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TERESINA EL 69 kV TERESINA  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  TERESINA EL 69 kV TERESINA  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  TERESINA EL 69 kV TERESINA  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TERESINA EL 69 kV TERESINA  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TERESINA EL 69 kV TERESINA  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  TERESINA EL 69 kV TERESINA  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  TERESINA EL 69 kV TERESINA  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TERESINA EL 69 kV TERESINA  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  TERESINA EL 69 kV TERESINA  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  TERESINA EL 69 kV TERESINA  DIST9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  TERESINA EL 69 kV TERESINA  DIST9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 65,480.30
  TERESINA EL 69 kV TERESINA  DIST9 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 204,661.71
  TERESINA IB 13,8 kV MG 230 kV TERESINA MG1 PI IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,720.57
  TERESINA IB 13,8 kV MG 230 kV TERESINA MG1 PI IB2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 27,424.24
  TERESINA IB 13,8 kV MG 230 kV TERESINA MG1 PI IB2 DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 85,715.73
  TERESINA IB 230 kV MG 230 kV TERESINA MG1 PI IB2 RB FT MG 230 kV TERESINA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  TERESINA IB 69 kV MG 230 kV TERESINA MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  TERESINA MC 13,8 kV BC 13,8 kV 3,6 Mvar TERESINA BC5 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  TERESINA MC 13,8 kV BC 13,8 kV 3,6 Mvar TERESINA BC6 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  TERESINA MC 13,8 kV BC 13,8 kV 3,6 Mvar TERESINA BC7 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  TERESINA MC 13,8 kV BC 13,8 kV 3,6 Mvar TERESINA BC8 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  TERESINA MC 13,8 kV BC 13,8 kV 3,6 Mvar TERESINA BC9 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  TERESINA MC 13,8 kV RTB 13,8 kV 5 Mvar TERESINA RT1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,981.90
  TERESINA MC 13,8 kV RTB 13,8 kV 5 Mvar TERESINA RT2 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,981.90
  TERESINA MC 13,8 kV TR 230/13,8 kV TERESINA TR2 PI RBF FT TR 230/13,8 kV TERESINA TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 44,484.03
  TERESINA MC 13,8 kV TR 230/69 kV TERESINA TR1 PI RBF FT TR 230/69 kV TERESINA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 44,484.03
  TERESINA MC 13,8 kV TR 230/69 kV TERESINA TR1 PI RBF FT TR 230/69 kV TERESINA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 42,184.43
  TERESINA MC 13,8 kV TR 230/69 kV TERESINA TR1 PI RBF FT TR 230/69 kV TERESINA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 136,517.03
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBNI REA 5861/2016 5/3/2017 5/2/2045 9,926.20
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RMEL REN 443/2011 23/11/2016 22/11/2049 99,809.56
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,241.74
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 133,940.24
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 433,456.73
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,241.74
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 133,940.24
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 433,456.73
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RMEL REN 443/2011 29/03/2017 28/03/2049 106,031.70
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBNI REA 5861/2016 5/3/2017 5/2/2045 9,926.20
  TERESINA MC 230 kV RTL 230 kV 10 MVAr TERESINA RT1 PI RB FT RTL 230 kV 10 MVAr TERESINA RT1 PI 061/2001 IPCA RMEL REN 443/2011 8/4/2017 8/3/2049 106,958.37
  TERESINA MC 230 kV RTL 230 kV 10 MVAr TERESINA RT1 PI RB FT RTL 230 kV 10 MVAr TERESINA RT1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  TERESINA MC 230 kV RTL 230 kV 10 MVAr TERESINA RT2 PI RB FT RTL 230 kV 10 MVAr TERESINA RT2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,294.90
  TERESINA MC 230 kV RTL 230 kV 10 MVAr TERESINA RT2 PI RB FT RTL 230 kV 10 MVAr TERESINA RT2 PI 061/2001 IPCA RMEL REN 443/2011 12/1/2017 30/11/2049 107,908.48
  TERESINA MC 230 kV TR 230/13,8 kV TERESINA TR2 PI TR1 RBF FT TR 230/13,8 kV TERESINA TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  TERESINA MC 230 kV TR 230/69 kV TERESINA TR3 PI RBF FT TR 230/69 kV TERESINA TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  TERESINA MC 230 kV TR 230/69 kV TERESINA TR3 PI RBF FT TR 230/69 kV TERESINA TR3 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  TERESINA MC 230 kV TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  TERESINA MC 230 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  TERESINA MC 230 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  TERESINA MC 230 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  TERESINA MC 230 kV TR 230/69 kV TERESINA TR6 PI RBF FT TR 230/69 kV TERESINA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC3 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC3 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC3 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,233.75
  TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 64,536.41
  TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 201,711.54
  TERESINA MC 69 kV TR 230/69 kV TERESINA TR1 PI RBF FT TR 230/69 kV TERESINA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  TERESINA MC 69 kV TR 230/69 kV TERESINA TR3 PI RBF FT TR 230/69 kV TERESINA TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  TERESINA MC 69 kV TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  TERESINA MC 69 kV TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83

 

 

100 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  TERESINA MC 69 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  TERESINA MC 69 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 54,555.83
  TERESINA MC 69 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 176,553.32
  TERESINA MC 69 kV TR 230/69 kV TERESINA TR6 PI RBF FT TR 230/69 kV TERESINA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 57,529.85
  TERESINA MC 69 kV TT 69/13,8 kV TERESINA TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  TERESINA MC 69 kV TT 69/13,8 kV TERESINA TA2 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  TERESINA MG 230 kV TERESINA MG1 PI RB FT MG 230 kV TERESINA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 705,549.29
  TERESINA MG 230 kV TERESINA MG1 PI RB FT MG 230 kV TERESINA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 669,075.84
  TERESINA MG 230 kV TERESINA MG1 PI RB FT MG 230 kV TERESINA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,165,259.93
  TERESINA RTB 13,8 kV 5 Mvar TERESINA RT1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 113,225.78
  TERESINA RTB 13,8 kV 5 Mvar TERESINA RT2 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 113,225.78
  TERESINA RTL 230 kV 10 MVAr TERESINA RT1 PI RB FT RTL 230 kV 10 MVAr TERESINA RT1 PI 061/2001 IPCA RMEL REN 443/2011 30/08/2017 29/08/2052 8,269.91
  TERESINA RTL 230 kV 10 MVAr TERESINA RT1 PI RB FT RTL 230 kV 10 MVAr TERESINA RT1 PI 061/2001 IPCA RMEL REN 443/2011 30/08/2017 29/08/2052 8,269.91
  TERESINA RTL 230 kV 10 MVAr TERESINA RT1 PI RB FT RTL 230 kV 10 MVAr TERESINA RT1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  TERESINA RTL 230 kV 10 MVAr TERESINA RT2 PI RB FT RTL 230 kV 10 MVAr TERESINA RT2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,307.96
  TERESINA RTL 230 kV 10 MVAr TERESINA RT2 PI RB FT RTL 230 kV 10 MVAr TERESINA RT2 PI 061/2001 IPCA RMEL REN 443/2011 31/08/2017 30/08/2052 8,270.43
  TERESINA RTL 230 kV 3,33 Mvar TERESINA RTR1 PI RB FT RTL 230 kV 3,33 Mvar TERESINA RTR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,047.53
  TERESINA TR 230/13,8 kV TERESINA TR2 PI RBF FT TR 230/13,8 kV TERESINA TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,911.51
  TERESINA TR 230/69 kV TERESINA TR1 PI RBF FT TR 230/69 kV TERESINA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,911.51
  TERESINA TR 230/69 kV TERESINA TR3 PI RBF FT TR 230/69 kV TERESINA TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  TERESINA TR 230/69 kV TERESINA TR3 PI RBF FT TR 230/69 kV TERESINA TR3 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  TERESINA TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  TERESINA TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  TERESINA TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 994,967.95
  TERESINA TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  TERESINA TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 307,449.93
  TERESINA TR 230/69 kV TERESINA TR6 PI RBF FT TR 230/69 kV TERESINA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,210.00
  TERESINA TT 69/13,8 kV TERESINA TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  TERESINA TT 69/13,8 kV TERESINA TA1 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  TERESINA TT 69/13,8 kV TERESINA TA2 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  TERESINA TT 69/13,8 kV TERESINA TA2 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 79,026.34
  TERESINA TT 69/13,8 kV TERESINA TA2 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 247,000.49
  TERESINA II CS 150/-105 MVAr TERESINA II CS1 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,484,280.13
  TERESINA II CS 150/-105 MVAr TERESINA II CS1 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,407,550.11
  TERESINA II CS 150/-105 MVAr TERESINA II CS1 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,555,106.72
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2031 103,531.43
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,376.92
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 190,018.42
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 614,936.67
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2044 24,886.59
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBNI REA 5861/2016 6/10/2016 6/9/2031 103,531.43
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA III C-1 PI RB FT LT 230 kV TERESINA II /TERESINA III C-1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 12/9/2041 523,272.46
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA III C-2 PI RB FT LT 230 kV TERESINA II /TERESINA III C-2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 12/9/2041 523,272.46
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046 47,617.06
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,322,567.42
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RMEL REN 443/2011 19/10/2015 18/10/2045 48,641.37
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBNI REA 5861/2016 6/8/2016 6/7/2044 24,297.02
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBNI REA 5861/2016 6/8/2016 6/7/2031 92,507.40
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBNI REA 5861/2016 6/8/2016 6/7/2044 24,297.02
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBNI REA 5861/2016 6/8/2016 6/7/2031 92,507.40
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RMEL REN 443/2011 15/11/2015 14/11/2045 47,272.32
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,322,567.42
  TERESINA II IB 230 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  TERESINA II IB 230 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  TERESINA II IB 230 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 374,783.88
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 13/12/2015 12/12/2045 47,373.93
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 22/08/2015 21/08/2045 46,963.88
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 20/09/2015 19/09/2045 47,069.11
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 16/08/2015 15/08/2045 15,647.37
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 18/05/2013 17/05/2043 14,655.51
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB3 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB3 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 643/2014 26/08/2013 25/08/2043 29,552.94
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB3 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 22/11/2015 21/11/2045 15,765.91
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB3 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 22/11/2015 21/11/2045 31,531.82
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB3 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 26/08/2013 25/08/2043 14,776.46
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB4 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBNI REA 2823/2011 29/09/2014 28/09/2045 1,557,603.36
  TERESINA II MC 13,8 kV CS 150/-105 MVAr TERESINA II CS1 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,419.78
  TERESINA II MC 13,8 kV CS 150/-105 MVAr TERESINA II CS1 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 52,554.84
  TERESINA II MC 13,8 kV CS 150/-105 MVAr TERESINA II CS1 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 170,077.73
  TERESINA II MC 13,8 kV RTS 13,8 kV 5 MVAr TERESINA II RT1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 34,310.42
  TERESINA II MC 13,8 kV RTS 13,8 kV 5 MVAr TERESINA II RT1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 32,536.73
  TERESINA II MC 13,8 kV RTS 13,8 kV 5 MVAr TERESINA II RT1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 105,295.22
  TERESINA II MC 230 kV TR 230/13,8 kV TERESINA II TR3 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  TERESINA II MC 230 kV TR 230/13,8 kV TERESINA II TR3 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 133,743.70
  TERESINA II MC 230 kV TR 230/13,8 kV TERESINA II TR3 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 432,820.70
  TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RMEL REN 643/2014 16/02/2014 15/02/2044 55,216.48
  TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 133,743.70
  TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 432,820.70
  TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR2 PI RB FT TR 500/230 kV TERESINA II TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 141,034.49
  TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR2 PI RB FT TR 500/230 kV TERESINA II TR2 PI 061/2001 IPCA RMEL REN 643/2014 9/6/2015 9/5/2045 1,130.32
  TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR3 PI RB FT TR 500/230 kV TERESINA II TR3 PI 061/2001 IPCA RBNI REA 2823/2011 6/1/2015 31/05/2045 1,101,923.52
  TERESINA II MC 500 kV RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RBNI REA 2823/2011 21/07/2015 20/07/2046 1,546,180.92
  TERESINA II MC 500 kV RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  TERESINA II MC 500 kV RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RMEL REN 643/2014 18/05/2013 17/05/2043 43,966.53
  TERESINA II MC 500 kV RTL 500 kV 100 MVAr TERESINA II RT2 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  TERESINA II MC 500 kV RTL 500 kV 150 Mvar TERESINA II RT3 PI RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  TERESINA II MC 500 kV RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  TERESINA II MC 500 kV RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 218,526.50
  TERESINA II MC 500 kV RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 707,194.39
  TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,697.68
  TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,167,288.04
  TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2045 47,323.12
  TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR2 PI RB FT TR 500/230 kV TERESINA II TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45

 

101 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

  TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR3 PI RB FT TR 500/230 kV TERESINA II TR3 PI 061/2001 IPCA RBNI REA 2823/2011 6/1/2015 31/05/2046 1,240,917.04
  TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBNI REA 2823/2011 17/04/2015 16/04/2045 1,403,312.36
  TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,702,147.11
  TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,614,154.43
  TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,223,718.61
  TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 643/2014 30/11/2013 29/11/2030 24,804.38
  TERESINA II RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RMEL REN 443/2011 7/1/2015 30/06/2045 15,591.72
  TERESINA II RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RMEL REN 443/2011 18/05/2013 17/05/2043 29,311.02
  TERESINA II RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 618,815.61
  TERESINA II RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 586,825.87
  TERESINA II RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,899,082.99
  TERESINA II RTB 500 kV 40 Mvar TERESINA II RTR1 PI RB FT RTB 500 kV 40 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,965.90
  TERESINA II RTB 500 kV 40 Mvar TERESINA II RTR1 PI RB FT RTB 500 kV 40 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 208,594.73
  TERESINA II RTB 500 kV 40 Mvar TERESINA II RTR1 PI RB FT RTB 500 kV 40 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 675,053.25
  TERESINA II RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 618,815.61
  TERESINA II RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 586,825.87
  TERESINA II RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,899,082.99
  TERESINA II RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RMEL REN 643/2014 1/11/2014 1/10/2049 37,128.71
  TERESINA II RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RMEL REN 443/2011 4/12/2015 4/11/2045 129,215.72
  TERESINA II RTL 500 kV 100 MVAr TERESINA II RT2 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 618,815.61
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT3 PI RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,178.08
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT3 PI RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 673,465.34
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT3 PI RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,179,465.23
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT3 PI RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RMEL REN 643/2014 19/12/2013 18/12/2048 37,070.34
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RMEL REN 643/2014 18/12/2013 17/12/2048 37,067.81
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,178.08
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 673,465.34
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,179,465.23
  TERESINA II RTL 500 kV 60 Mvar TERESINA II RTR1 PI RB FT RTL 500 kV 60 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,420.05
  TERESINA II RTL 500 kV 60 Mvar TERESINA II RTR1 PI RB FT RTL 500 kV 60 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 237,474.56
  TERESINA II RTL 500 kV 60 Mvar TERESINA II RTR1 PI RB FT RTL 500 kV 60 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 768,514.00
  TERESINA II RTS 13,8 kV 5 MVAr TERESINA II RT1 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,054.05
  TERESINA II RTS 13,8 kV 5 MVAr TERESINA II RT1 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 109,106.32
  TERESINA II RTS 13,8 kV 5 MVAr TERESINA II RT1 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 353,089.34
  TERESINA II TR 230/13,8 kV TERESINA II TR3 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 530,576.42
  TERESINA II TR 230/13,8 kV TERESINA II TR3 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 503,148.21
  TERESINA II TR 230/13,8 kV TERESINA II TR3 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,628,285.77
  TERESINA II TR 230/13,8 kV TERESINA II TRR2 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 176,858.81
  TERESINA II TR 230/13,8 kV TERESINA II TRR2 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 167,716.07
  TERESINA II TR 230/13,8 kV TERESINA II TRR2 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 542,761.92
  TERESINA II TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,335,221.55
  TERESINA II TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,266,197.12
  TERESINA II TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,097,660.89
  TERESINA II TR 500/230 kV TERESINA II TR2 PI RB FT TR 500/230 kV TERESINA II TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,335,221.55
  TERESINA II TR 500/230 kV TERESINA II TR3 PI RB FT TR 500/230 kV TERESINA II TR3 PI 061/2001 IPCA RBNI REA 2823/2011 6/1/2015 31/05/2050 3,833,070.79
  TERESINA II TR 500/230 kV TERESINA II TRR1 PI RB FT TR 500/230 kV TERESINA II TRR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 445,073.85
  TERESINA II TR 500/230 kV TERESINA II TRR1 PI RB FT TR 500/230 kV TERESINA II TRR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 422,065.71
  TERESINA II TR 500/230 kV TERESINA II TRR1 PI RB FT TR 500/230 kV TERESINA II TRR1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,365,886.96
  TERESINA III EL 230 kV TERESINA III LT 230 kV TERESINA II /TERESINA III C-1 PI RB FT LT 230 kV TERESINA II /TERESINA III C-1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 12/9/2041 523,272.46
  TERESINA III EL 230 kV TERESINA III LT 230 kV TERESINA II /TERESINA III C-2 PI RB FT LT 230 kV TERESINA II /TERESINA III C-2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 12/9/2041 523,272.46
  TERESINA III EL 69 kV TERESINA III  DIST1 DIT   017/2011 IPCA RPEC CC 017/2011 6/5/2018 12/9/2041 173,712.16
  TERESINA III EL 69 kV TERESINA III  DIST2 DIT   017/2011 IPCA RPEC CC 017/2011 6/5/2018 12/9/2041 173,712.16
  TERESINA III EL 69 kV TERESINA III  DIST3 DIT   017/2011 IPCA RPEC CC 017/2011 6/5/2018 12/9/2041 173,712.16
  TERESINA III IB 230 kV MG 230 kV TERESINA III MG1 PI IB1 RB FT MG 230 kV TERESINA III MG1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 12/9/2041 282,359.41
  TERESINA III IB 69 kV MG 230 kV TERESINA III MG1 PI IB1 DIT   017/2011 IPCA RPEC CC 017/2011 6/5/2018 12/9/2041 101,760.71
  TERESINA III MC 230 kV TR 230/69 kV TERESINA III TR1 PI RBF FT TR 230/69 kV TERESINA III TR1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 12/9/2041 372,621.68
  TERESINA III MC 230 kV TR 230/69 kV TERESINA III TR2 PI RBF FT TR 230/69 kV TERESINA III TR2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 12/9/2041 372,621.68
  TERESINA III MC 230 kV TR 230/69 kV TERESINA III TR3 PI RBF FT TR 230/69 kV TERESINA III TR3 PI 017/2011 IPCA RBNI REA 5166/2015 10/5/2018 10/5/2042 487,820.99
  TERESINA III MC 69 kV TR 230/69 kV TERESINA III TR1 PI RBF FT TR 230/69 kV TERESINA III TR1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 12/9/2041 151,604.94
  TERESINA III MC 69 kV TR 230/69 kV TERESINA III TR2 PI RBF FT TR 230/69 kV TERESINA III TR2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 12/9/2041 151,604.94
  TERESINA III MC 69 kV TR 230/69 kV TERESINA III TR3 PI RBF FT TR 230/69 kV TERESINA III TR3 PI 017/2011 IPCA RBNI REA 5166/2015 10/5/2018 10/5/2041 200,732.16
  TERESINA III MC 69 kV TT 69/0 kV TERESINA III TT1 PI DIT   017/2011 IPCA RPEC CC 017/2011 6/5/2018 12/9/2041 62,631.35
  TERESINA III MG 230 kV TERESINA III MG1 PI RB FT MG 230 kV TERESINA III MG1 PI 017/2011 IPCA RBNI REA 5166/2015 10/5/2018 10/5/2056 51,055.51
  TERESINA III MG 230 kV TERESINA III MG1 PI RB FT MG 230 kV TERESINA III MG1 PI 017/2011 IPCA RBNI REA 5166/2015 10/5/2018 10/5/2056 13,527.06
  TERESINA III MG 230 kV TERESINA III MG1 PI RB FT MG 230 kV TERESINA III MG1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 12/9/2041 1,153,842.85
  TERESINA III TR 230/69 kV TERESINA III TR1 PI RBF FT TR 230/69 kV TERESINA III TR1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 12/9/2041 1,313,353.93
  TERESINA III TR 230/69 kV TERESINA III TR2 PI RBF FT TR 230/69 kV TERESINA III TR2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 12/9/2041 1,313,353.93
  TERESINA III TR 230/69 kV TERESINA III TR3 PI RBF FT TR 230/69 kV TERESINA III TR3 PI 017/2011 IPCA RBNI REA 5166/2015 10/5/2018 10/5/2053 1,386,186.86
  TERESINA III TT 69/0 kV TERESINA III TT1 PI DIT   017/2011 IPCA RPEC CC 017/2011 6/5/2018 12/9/2041 168,208.33
  TIANGUA II EL 500 kV TIANGUA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBNI REA 9688/2021 19/09/2019 18/09/2047 164,694.41
  TIANGUA II EL 500 kV TIANGUA II LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBNI CC 061/2001 10/3/2019 10/2/2047 164,694.41
  TOUROS EL 230 kV TOUROS LT 230 kV TOUROS /CEARA MIRIM II C-1 RN RB FT LT 230 kV TOUROS /CEARA MIRIM II C-1 RN 018/2012 IPCA RBL CC 018/2012 5/12/2017 6/1/2042 441,712.23
  TOUROS IB 230 kV MG 230 kV TOUROS MG1 RN IB1 RB FT MG 230 kV TOUROS MG1 RN 018/2012 IPCA RBL CC 018/2012 5/12/2017 6/1/2042 273,021.07
  TOUROS IB 69 kV MG 69 kV TOUROS MG2 RN IB1 ICG   018/2012 IPCA RICG CC 018/2012 5/12/2017 6/1/2042 114,201.45
  TOUROS MC 230 kV TR 230/69 kV TOUROS TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 5/12/2017 6/1/2042 422,377.27
  TOUROS MC 69 kV TR 230/69 kV TOUROS TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 5/12/2017 6/1/2042 167,502.62
  TOUROS MC 69 kV TT 69/0 kV TOUROS TT1 RN ICG   018/2012 IPCA RICG CC 018/2012 5/12/2017 6/1/2042 70,909.48
  TOUROS MG 230 kV TOUROS MG1 RN RB FT MG 230 kV TOUROS MG1 RN 018/2012 IPCA RBL CC 018/2012 5/12/2017 6/1/2042 736,823.71
  TOUROS MG 69 kV TOUROS MG2 RN ICG   018/2012 IPCA RICG CC 018/2012 5/12/2017 6/1/2042 485,079.54
  TOUROS TR 230/69 kV TOUROS TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 5/12/2017 6/1/2042 1,279,558.59
  TOUROS TT 69/0 kV TOUROS TT1 RN ICG   018/2012 IPCA RICG CC 018/2012 5/12/2017 6/1/2042 68,188.22
  U.SOBRADINHO EL 230 kV U.SOBRADINHO  PED. BRANCA FIC DIT   061/2001 IPCA RCDM REN 443/2011 2/3/2013 31/12/2042 72,499.07
  U.SOBRADINHO EL 230 kV U.SOBRADINHO  S.PED.LAGO FIC DIT   061/2001 IPCA RCDM REN 443/2011 2/3/2013 31/12/2042 72,499.07
  U.SOBRADINHO EL 230 kV U.SOBRADINHO  SET.GAME. FIC DIT   061/2001 IPCA RCDM REN 443/2011 2/3/2013 31/12/2042 72,499.07
  U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 19/09/2017 18/09/2032 36,501.50
  U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBNI REA 2823/2011 8/10/2015 8/9/2045 494,116.82
  U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 207,287.43
  U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBNI REA 5861/2016 19/09/2017 18/09/2032 36,501.50
  U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RMEL REN 443/2011 2/12/2017 2/11/2047 60,007.51
  U.SOBRADINHO EL 500 kV U.SOBRADINHO LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  U.SOBRADINHO EL 500 kV U.SOBRADINHO LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  U.SOBRADINHO EL 500 kV U.SOBRADINHO LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBNI REA 5861/2016 6/9/2016 6/8/2031 35,364.48
  U.SOBRADINHO EL 500 kV U.SOBRADINHO LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  U.SOBRADINHO IB 230 kV MG 500 kV U.SOBRADINHO MG1 BA IB1 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB1 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB2 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB2 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RMEL REN 443/2011 3/5/2016 3/4/2046 15,891.71
  U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB3 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB4 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB5 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBNI REA 2823/2011 15/12/2014 14/12/2045 1,276,566.03
  U.SOBRADINHO MC 13,8 kV TR 500/230 kV U.SOBRADINHO TR4 BA RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  U.SOBRADINHO MC 230 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,627.54
  U.SOBRADINHO MC 230 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 140,944.22
  U.SOBRADINHO MC 230 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 456,123.00
  U.SOBRADINHO MC 230 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RMEL REN 443/2011 27/11/2017 26/11/2047 61,271.07
  U.SOBRADINHO MC 230 kV TR 500/230 kV U.SOBRADINHO TR3 BA RB FT TR 500/230 kV U.SOBRADINHO TR3 BA 061/2001 IPCA RBNI REA 2823/2011 15/12/2014 14/12/2044 1,155,582.87
  U.SOBRADINHO MC 230 kV TR 500/230 kV U.SOBRADINHO TR4 BA MC1 RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 133,441.45
  U.SOBRADINHO MC 230 kV TR 500/230 kV U.SOBRADINHO TR4 BA MC2 RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 133,441.45
  U.SOBRADINHO MC 500 kV RTL 500 kV 100 Mvar U.SOBRADINHO RT4 BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07

102 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  U.SOBRADINHO MC 500 kV RTL 500 kV 100 Mvar U.SOBRADINHO RT5 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  U.SOBRADINHO MC 500 kV RTL 500 kV 100 Mvar U.SOBRADINHO RT6 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  U.SOBRADINHO MC 500 kV RTL 500 kV 150 Mvar U.SOBRADINHO RT3 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  U.SOBRADINHO MC 500 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  U.SOBRADINHO MC 500 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,697.68
  U.SOBRADINHO MC 500 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,167,288.04
  U.SOBRADINHO MC 500 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2046 48,709.31
  U.SOBRADINHO MC 500 kV TR 13,8/500 kV U.SOBRADINHO TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 374,316.30
  U.SOBRADINHO MC 500 kV TR 13,8/500 kV U.SOBRADINHO TR2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 374,316.30
  U.SOBRADINHO MC 500 kV TR 13,8/500 kV U.SOBRADINHO TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 374,316.30
  U.SOBRADINHO MC 500 kV TR 500/230 kV U.SOBRADINHO TR3 BA RB FT TR 500/230 kV U.SOBRADINHO TR3 BA 061/2001 IPCA RBNI REA 2823/2011 15/12/2014 14/12/2045 1,735,420.03
  U.SOBRADINHO MC 500 kV TR 500/230 kV U.SOBRADINHO TR4 BA RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,360.45
  U.SOBRADINHO MC 69 kV RTN 69 kV 0 Mvar U.SOBRADINHO RTN3 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,600.99
  U.SOBRADINHO MC 69 kV RTN 69 kV 0 Mvar U.SOBRADINHO RTN4 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,600.99
  U.SOBRADINHO MC 69 kV RTN 69 kV 0 Mvar U.SOBRADINHO RTN5 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,600.99
  U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 49,910.80
  U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBNI REN 443/2011 2/3/2013 31/12/2042 16,998.86
  U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBNI REA 2823/2011 15/12/2014 14/12/2042 172,012.94
  U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,685,929.20
  U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,598,774.91
  U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,173,947.49
  U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT4 BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 618,815.61
  U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT4 BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 586,825.87
  U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT5 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 618,815.61
  U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT5 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 586,825.87
  U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT6 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 618,815.61
  U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT6 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 586,825.87
  U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT6 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,899,082.99
  U.SOBRADINHO RTL 500 kV 150 Mvar U.SOBRADINHO RT3 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,178.08
  U.SOBRADINHO RTL 500 kV 150 Mvar U.SOBRADINHO RT3 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 673,465.34
  U.SOBRADINHO RTL 500 kV 33,3 Mvar U.SOBRADINHO RTR1 BA RB FT RTL 500 kV 33,3 Mvar U.SOBRADINHO RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 206,196.72
  U.SOBRADINHO RTL 500 kV 33,3 Mvar U.SOBRADINHO RTR1 BA RB FT RTL 500 kV 33,3 Mvar U.SOBRADINHO RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 195,537.36
  U.SOBRADINHO RTL 500 kV 50 Mvar U.SOBRADINHO RTR3 BA RB FT RTL 500 kV 50 Mvar U.SOBRADINHO RTR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 236,726.03
  U.SOBRADINHO RTL 500 kV 50 Mvar U.SOBRADINHO RTR3 BA RB FT RTL 500 kV 50 Mvar U.SOBRADINHO RTR3 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 224,488.45
  U.SOBRADINHO RTN 69 kV 0 Mvar U.SOBRADINHO RTN3 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,662.15
  U.SOBRADINHO RTN 69 kV 0 Mvar U.SOBRADINHO RTN4 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,662.15
  U.SOBRADINHO RTN 69 kV 0 Mvar U.SOBRADINHO RTN5 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,662.15
  U.SOBRADINHO TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,335,221.55
  U.SOBRADINHO TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,266,197.12
  U.SOBRADINHO TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,097,660.89
  U.SOBRADINHO TR 500/230 kV U.SOBRADINHO TR3 BA RB FT TR 500/230 kV U.SOBRADINHO TR3 BA 061/2001 IPCA RBNI REA 2823/2011 15/12/2014 14/12/2049 5,060,550.15
  U.SOBRADINHO TR 500/230 kV U.SOBRADINHO TR4 BA RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,266,197.12
  U.SOBRADINHO TR 500/230 kV U.SOBRADINHO TR4 BA RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,335,221.55
  U.SOBRADINHO TR 500/230 kV U.SOBRADINHO TRR1 BA RB FT TR 500/230 kV U.SOBRADINHO TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 445,073.85
  U.SOBRADINHO TR 500/230 kV U.SOBRADINHO TRR1 BA RB FT TR 500/230 kV U.SOBRADINHO TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 422,065.71
  UB.ESPERANCA EL 13,8 kV UB.ESPERANCA  BOA ESPER.-01Y3 DIT   061/2001 IPCA RCDM REA 1814/2009 1/7/2015 1/6/2048 17,782.82
  UB.ESPERANCA EL 13,8 kV UB.ESPERANCA  BOA ESPER.-01Y3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  UB.ESPERANCA EL 13,8 kV UB.ESPERANCA  GUADALUPE-01Y1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  UB.ESPERANCA EL 13,8 kV UB.ESPERANCA  GUADALUPE-01Y1 DIT   061/2001 IPCA RCDM REA 1814/2009 1/7/2015 1/6/2048 17,782.82
  UB.ESPERANCA EL 13,8 kV UB.ESPERANCA  S.J.PATOS-01Y2 DIT   061/2001 IPCA RCDM REA 1814/2009 1/7/2015 1/6/2048 17,782.82
  UB.ESPERANCA EL 13,8 kV UB.ESPERANCA  S.J.PATOS-01Y2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  UB.ESPERANCA EL 230 kV UB.ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,191.66
  UB.ESPERANCA EL 230 kV UB.ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 185,101.21
  UB.ESPERANCA EL 69 kV UB.ESPERANCA  BERTOLINEA-02J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 62,583.94
  UB.ESPERANCA EL 69 kV UB.ESPERANCA  PARAIBANO-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 62,583.94
  UB.ESPERANCA EL 69 kV UB.ESPERANCA  PARAIBANO-02J3 DIT   061/2001 IPCA RMEL REN 443/2011 17/01/2017 16/01/2049 37,811.38
  UB.ESPERANCA EL 69 kV UB.ESPERANCA  S.J.PATOS-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 62,583.94
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB1 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB1 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB1 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 374,783.88
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB2 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB2 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB2 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 374,783.88
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB2 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RMEL REN 643/2014 23/03/2014 22/03/2044 55,370.03
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB3 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,123.21
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB3 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 115,810.04
  UB.ESPERANCA MC 13,8 kV TR 230/69 kV UB.ESPERANCA TR5 PI RBF FT TR 230/69 kV UB.ESPERANCA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,987.20
  UB.ESPERANCA MC 13,8 kV TR 69/13,8 kV UB.ESPERANCA TR7 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,335.89
  UB.ESPERANCA MC 13,8 kV TR 69/13,8 kV UB.ESPERANCA TR7 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,904.70
  UB.ESPERANCA MC 13,8 kV TR 69/13,8 kV UB.ESPERANCA TR7 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 124,724.00
  UB.ESPERANCA MC 230 kV TR  230/69   kV UB.ESPERANCA   TR8 PI RBF FT TR  230/69   kV UB.ESPERANCA   TR8 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,587.79
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 131,320.98
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR1 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 129,917.18
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR1 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 406,062.16
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR2 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 131,320.98
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR2 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 129,917.18
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR2 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 406,062.16
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR3 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 131,320.98
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR3 PI DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 129,917.18
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR4 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 131,320.98
  UB.ESPERANCA MC 230 kV TR 230/69 kV UB.ESPERANCA TR5 PI RBF FT TR 230/69 kV UB.ESPERANCA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 133,441.45
  UB.ESPERANCA MC 230 kV TR 230/69 kV UB.ESPERANCA TR6 PI RBF FT TR 230/69 kV UB.ESPERANCA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,587.79
  UB.ESPERANCA MC 69 kV TR  230/69   kV UB.ESPERANCA   TR8 PI RBF FT TR  230/69   kV UB.ESPERANCA   TR8 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,531.97
  UB.ESPERANCA MC 69 kV TR 230/69 kV UB.ESPERANCA TR5 PI RBF FT TR 230/69 kV UB.ESPERANCA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,531.97
  UB.ESPERANCA MC 69 kV TR 230/69 kV UB.ESPERANCA TR6 PI RBF FT TR 230/69 kV UB.ESPERANCA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,531.97
  UB.ESPERANCA MC 69 kV TR 69/13,8 kV UB.ESPERANCA TR7 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,713.10
  UB.ESPERANCA MC 69 kV TT 69/69 kV UB.ESPERANCA TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,678.13
  UB.ESPERANCA MG 230 kV UB.ESPERANCA MG1 PI RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 527,432.55
  UB.ESPERANCA MG 230 kV UB.ESPERANCA MG1 PI RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 500,166.87
  UB.ESPERANCA MG 230 kV UB.ESPERANCA MG1 PI RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,618,637.55
  UB.ESPERANCA MG 230 kV UB.ESPERANCA MG1 PI RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 94,881.50
  UB.ESPERANCA TR  230/69   kV UB.ESPERANCA   TR8 PI RBF FT TR  230/69   kV UB.ESPERANCA   TR8 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 191,938.38
  UB.ESPERANCA TR  230/69   kV UB.ESPERANCA   TR8 PI RBF FT TR  230/69   kV UB.ESPERANCA   TR8 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 182,016.10
  UB.ESPERANCA TR  230/69   kV UB.ESPERANCA   TR8 PI RBF FT TR  230/69   kV UB.ESPERANCA   TR8 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 589,039.61
  UB.ESPERANCA TR 230/69 kV UB.ESPERANCA TR5 PI RBF FT TR 230/69 kV UB.ESPERANCA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 273,546.96
  UB.ESPERANCA TR 230/69 kV UB.ESPERANCA TR6 PI RBF FT TR 230/69 kV UB.ESPERANCA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,911.51
  UB.ESPERANCA TR 230/69 kV UB.ESPERANCA TR6 PI RBF FT TR 230/69 kV UB.ESPERANCA TR6 PI 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 161,127.91
  UB.ESPERANCA TR 69/13,8 kV UB.ESPERANCA TR7 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  UB.ESPERANCA TT 69/69 kV UB.ESPERANCA TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
  US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,053.91
  US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 96,016.41
  US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,053.91
  US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR2 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 96,016.41
  US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 97,053.91
  US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR3 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 96,016.41
  US. FUNIL MG 115 kV US. FUNIL MG1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 247,322.31
  US. FUNIL MG 115 kV US. FUNIL MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 244,678.47
  US. FUNIL MG 115 kV US. FUNIL MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 764,753.88
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76

 

103 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBNI REA 5745/2016 1/10/2020 1/10/2049 1,191,089.46
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBNI REA 5861/2016 9/6/2015 9/5/2043 23,825.05
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBNI REA 5861/2016 9/6/2015 9/5/2030 89,869.55
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RMEL REN 443/2011 24/08/2016 23/08/2046 11,281.32
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RMEL REN 443/2011 24/08/2016 23/08/2046 11,281.32
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RMEL REN 443/2011 24/08/2016 23/08/2046 11,281.32
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RMEL REN 643/2014 13/12/2013 12/12/2043 44,724.95
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 643/2014 21/02/2014 20/02/2044 23,257.61
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 643/2014 21/02/2014 20/02/2044 42,916.80
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RMEL REN 643/2014 15/02/2014 14/02/2044 65,184.85
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB1 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB1 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB1 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB1 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 31/10/2013 30/10/2043 29,712.60
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB1 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 31/10/2013 30/10/2043 14,856.29
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB2 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB2 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB2 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 11/8/2013 11/7/2043 14,865.98
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 11/8/2013 11/7/2043 14,865.98
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 22/11/2013 21/11/2043 44,648.73
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB4 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBNI REA 5745/2016 13/03/2019 13/03/2050 1,223,491.77
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2043 14,891.38
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2043 29,782.76
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2043 44,674.14
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB6 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 28/02/2014 27/02/2044 65,252.06
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB6 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  US. L.GONZAGA MC 500 kV RTL 500 kV 100 MVAr US. L.GONZAGA RT3 PE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  US. L.GONZAGA MC 500 kV RTL 500 kV 100 MVAr US. L.GONZAGA RT3 PE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 643/2014 14/06/2013 13/06/2043 44,064.51
  US. L.GONZAGA MC 500 kV RTL 500 kV 100 MVAr US. L.GONZAGA RT4 PE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 643/2014 7/11/2013 7/10/2043 44,162.48
  US. L.GONZAGA MC 500 kV RTL 500 kV 100 MVAr US. L.GONZAGA RT4 PE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  US. L.GONZAGA MC 500 kV RTL 500 kV 150 Mvar US. L.GONZAGA RT1 PE RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  US. L.GONZAGA MC 500 kV RTL 500 kV 150 Mvar US. L.GONZAGA RT1 PE RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RMEL REN 643/2014 13/09/2013 9/12/2043 44,394.72
  US. L.GONZAGA MC 500 kV RTL 500 kV 150 Mvar US. L.GONZAGA RT2 PE RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 230,439.07
  US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 374,316.30
  US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR1 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 370,314.91
  US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 374,316.30
  US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR2 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 370,314.91
  US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR3 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 374,316.30
  US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR3 PE DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 370,314.91
  US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR3 PE DIT   061/2001 IPCA RMEL REN 643/2014 25/10/2013 24/10/2043 44,547.13
  US. L.GONZAGA MC 69 kV RTN 69 kV 0 Mvar US. L.GONZAGA RTN1 PE RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,600.99
  US. L.GONZAGA MC 69 kV RTN 69 kV 0 Mvar US. L.GONZAGA RTN2 PE RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,600.99
  US. L.GONZAGA MG 500 kV US. L.GONZAGA MG1 PE RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,725,539.89
  US. L.GONZAGA MG 500 kV US. L.GONZAGA MG1 PE RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,636,337.91
  US. L.GONZAGA MG 500 kV US. L.GONZAGA MG1 PE RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2029 86,829.35
  US. L.GONZAGA MG 500 kV US. L.GONZAGA MG1 PE RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 443/2011 15/11/2016 14/11/2033 14,233.87
  US. L.GONZAGA RTL 500 kV 100 MVAr US. L.GONZAGA RT3 PE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 288,787.75
  US. L.GONZAGA RTL 500 kV 100 MVAr US. L.GONZAGA RT4 PE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 288,787.75
  US. L.GONZAGA RTL 500 kV 150 Mvar US. L.GONZAGA RT1 PE RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,178.08
  US. L.GONZAGA RTL 500 kV 150 Mvar US. L.GONZAGA RT1 PE RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 673,465.34
  US. L.GONZAGA RTL 500 kV 150 Mvar US. L.GONZAGA RT2 PE RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,178.08
  US. L.GONZAGA RTL 500 kV 150 Mvar US. L.GONZAGA RT2 PE RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 673,465.34
  US. L.GONZAGA RTL 500 kV 40 Mvar US. L.GONZAGA RTR2 PE RB FT RTL 500 kV 40 Mvar US. L.GONZAGA RTR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,965.90
  US. L.GONZAGA RTL 500 kV 50 Mvar US. L.GONZAGA RTR1 PE RB FT RTL 500 kV 50 Mvar US. L.GONZAGA RTR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 236,726.03
  US. L.GONZAGA RTL 500 kV 50 Mvar US. L.GONZAGA RTR1 PE RB FT RTL 500 kV 50 Mvar US. L.GONZAGA RTR1 PE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 224,488.45
  US. L.GONZAGA RTN 69 kV 0 Mvar US. L.GONZAGA RTN1 PE RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,662.15
  US. L.GONZAGA RTN 69 kV 0 Mvar US. L.GONZAGA RTN2 PE RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,662.15
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBNI REA 4809/2014 22/08/2014 21/08/2042 18,776.74
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,322,567.42
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,322,567.42
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBNI REA 5861/2016 5/8/2016 5/7/2044 19,770.99
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBNI REA 5861/2016 5/8/2016 5/7/2044 19,770.99
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,958.19
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 408,679.76
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,322,567.42
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 25/05/2013 24/05/2043 29,327.95
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 5/7/2014 5/6/2044 59,593.76
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 443/2011 5/7/2014 5/6/2044 47,518.15
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 443/2011 5/7/2014 5/6/2044 47,518.15
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB2 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB2 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB2 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB2 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 5/9/2014 5/8/2044 65,613.96
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB3 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 24/05/2013 23/05/2043 43,988.31
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB3 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB3 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB3 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB4 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB4 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB4 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB4 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 14/05/2014 13/05/2044 65,639.81
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB5 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB5 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB5 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB6 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,643.75
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB6 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 382,777.34
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB6 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,238,742.14

 

104 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 374,316.30
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR1 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 370,314.91
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR1 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,157,436.40
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR1 AL DIT   061/2001 IPCA RCDM REA 5484/2015 22/08/2014 21/08/2042 30,567.77
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR2 AL DIT   061/2001 IPCA RMEL REN 643/2014 14/03/2013 13/03/2043 29,153.77
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR2 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 374,316.30
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR2 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 370,314.91
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR2 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,157,436.40
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR2 AL DIT   061/2001 IPCA RCDM REA 5484/2015 22/08/2014 21/08/2042 30,567.77
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR3 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 374,316.30
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR3 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 370,314.91
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR3 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,157,436.40
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR3 AL DIT   061/2001 IPCA RCDM REA 5484/2015 22/08/2014 21/08/2042 30,567.77
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR3 AL DIT   061/2001 IPCA RMEL REN 643/2014 3/8/2013 3/7/2043 43,708.88
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR4 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 374,316.30
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR4 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 370,314.91
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR4 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,157,436.40
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR4 AL DIT   061/2001 IPCA RCDM REA 5484/2015 22/08/2014 21/08/2042 30,567.77
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR5 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 374,316.30
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR5 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 370,314.91
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR5 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,157,436.40
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR5 AL DIT   061/2001 IPCA RCDM REA 5484/2015 22/08/2014 21/08/2042 30,567.77
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR6 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 374,316.30
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR6 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 370,314.91
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR6 AL DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,157,436.40
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR6 AL DIT   061/2001 IPCA RCDM REA 5861/2016 22/08/2014 21/08/2042 30,567.77
  USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 7/8/2013 7/7/2030 22,467.43
  USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2029 43,419.76
  USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 2/7/2014 2/6/2028 18,316.64
  USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,815,105.06
  USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,721,273.00
  USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,570,375.22
  ZEBU EL 13,8 kV ZEBU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  ZEBU EL 13,8 kV ZEBU  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  ZEBU EL 13,8 kV ZEBU  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  ZEBU EL 13,8 kV ZEBU  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,112.38
  ZEBU EL 138 kV ZEBU LT 138 kV USINA PA-II /ZEBU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 105,194.68
  ZEBU EL 230 kV ZEBU LT 230 kV P.AFONSO III /ZEBU C-1 AL RB FT LT 230 kV P.AFONSO III /ZEBU C-1 AL 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 549,385.66
  ZEBU EL 230 kV ZEBU LT 230 kV P.AFONSO III /ZEBU C-2 AL RB FT LT 230 kV P.AFONSO III /ZEBU C-2 AL/BA 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 549,385.66
  ZEBU EL 69 kV ZEBU  ADUTORA DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 150,608.84
  ZEBU EL 69 kV ZEBU  BARRO VERMELHO DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 150,608.84
  ZEBU EL 69 kV ZEBU  D. GOUVEIA C1 DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 150,608.84
  ZEBU EL 69 kV ZEBU  D. GOUVEIA C2 DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 150,608.84
  ZEBU EL 69 kV ZEBU LT 69 kV ABAIXADORA /ZEBU C-1 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ZEBU EL 69 kV ZEBU LT 69 kV ZEBU /ITAPARICA C-1 BA/PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ZEBU EL 69 kV ZEBU LT 69 kV ZEBU /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ZEBU EL 69 kV ZEBU LT 69 kV ZEBU /XINGO C-1 AL DIT   061/2001 IPCA RMEL REN 443/2011 11/11/2015 11/10/2038 6,146.54
  ZEBU EL 69 kV ZEBU LT 69 kV ZEBU /XINGO C-1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,187.84
  ZEBU IB 230 kV MG 230 kV ZEBU MG1 BA IB1 RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 269,951.79
  ZEBU IB 69 kV MG 138 kV ZEBU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,052.17
  ZEBU IB 69 kV MG 230 kV ZEBU MG1 BA IB1 DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 99,999.63
  ZEBU MC 230 kV TR 230/69 kV ZEBU TR1 AL RBF FT TR 230/69 kV ZEBU TR1 BA 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 332,618.20
  ZEBU MC 230 kV TR 230/69 kV ZEBU TR2 AL RBF FT TR 230/69 kV ZEBU TR2 BA 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 332,618.20
  ZEBU MC 230 kV TR 230/69 kV ZEBU TR3 AL RBF FT TR 230/69 kV ZEBU TR3 AL 017/2009 IPCA RBNIA REA 5677/2016     509,167.52
  ZEBU MC 69 kV TR 138/69 kV ZEBU TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,615.66
  ZEBU MC 69 kV TR 230/69 kV ZEBU TR1 AL RBF FT TR 230/69 kV ZEBU TR1 BA 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 120,144.51
  ZEBU MC 69 kV TR 230/69 kV ZEBU TR2 AL RBF FT TR 230/69 kV ZEBU TR2 BA 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 120,144.51
  ZEBU MC 69 kV TR 230/69 kV ZEBU TR3 AL RBF FT TR 230/69 kV ZEBU TR3 AL 017/2009 IPCA RBNIA REA 5677/2016     209,710.69
  ZEBU MC 69 kV TR 69/13,8 kV ZEBU TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,615.66
  ZEBU MC 69 kV TT 69/0 kV ZEBU TT1 AL DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 75,629.76
  ZEBU MG 138 kV ZEBU MG1 BA DIT   061/2001 IPCA RMEL REN 643/2014 27/11/2015 26/11/2032 15,545.27
  ZEBU MG 138 kV ZEBU MG1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 327,460.79
  ZEBU MG 230 kV ZEBU MG1 BA RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 811,196.24
  ZEBU MG 230 kV ZEBU MG1 BA RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBNIA REA 5677/2016     49,786.10
  ZEBU MG 230 kV ZEBU MG1 BA RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBNIA REA 5677/2016     13,191.79
  ZEBU MG 230 kV ZEBU MG1 BA RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBNIA REA 5677/2016     13,191.79
  ZEBU TR 138/69 kV ZEBU TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 77,904.59
  ZEBU TR 138/69 kV ZEBU TR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 77,071.80
  ZEBU TR 138/69 kV ZEBU TR6 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 77,904.59
  ZEBU TR 230/69 kV ZEBU TR1 AL RBF FT TR 230/69 kV ZEBU TR1 BA 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 1,017,477.87
  ZEBU TR 230/69 kV ZEBU TR2 AL RBF FT TR 230/69 kV ZEBU TR2 BA 017/2009 IPCA RBL CC 017/2009 8/3/2009 8/3/2039 1,017,477.87
  ZEBU TR 230/69 kV ZEBU TR3 AL RBF FT TR 230/69 kV ZEBU TR3 AL 017/2009 IPCA RBNIA REA 5677/2016     1,164,048.27
  ZEBU TR 69/13,8 kV ZEBU TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 24,607.52
  ZEBU TR 69/13,8 kV ZEBU TR3 BA DIT   061/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 24,344.47
  ZEBU TT 69/0 kV ZEBU TT1 AL DIT   017/2009 IPCA RPEC CC 017/2009 8/3/2009 8/3/2039 65,936.46
  ZEBU TT 69/13,8 kV ZEBU TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,880.25
ELETRONORTE ABUNA EL 230 kV ABUNA LT 230 kV ABUNA /PORTO VELHO C-1 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 202,955.64
  ABUNA EL 230 kV ABUNA LT 230 kV ABUNA /PORTO VELHO C-2 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 615,869.09
  ABUNA EL 230 kV ABUNA LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 202,955.64
  ABUNA EL 230 kV ABUNA LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 615,869.09
  ABUNA IB 138 kV MG 230 kV ABUNA MG1 RO IB1 DIT   058/2001 IPCA RCDM REA 3216/2011 1/12/2014 1/11/2045 475,154.45
  ABUNA IB 230 kV MG 230 kV ABUNA MG1 RO IB1 RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RBNI REA 3216/2011 1/12/2014 1/11/2043 604,030.00
  ABUNA MC 138 kV TR 230/138 kV ABUNA TR1 RO RBF FT TR 230/138 kV ABUNA TR1 RO 058/2001 IPCA RBNI REA 3216/2011 1/12/2014 1/11/2045 557,952.39
  ABUNA MC 138 kV TR 230/138 kV ABUNA TR1 RO RBF FT TR 230/138 kV ABUNA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 101,803.73
  ABUNA MC 138 kV TR 230/138 kV ABUNA TR2 RO RBF FT TR 230/138 kV ABUNA TR2 RO 058/2001 IPCA RBNI REA 3216/2011 1/12/2014 1/11/2045 558,012.09
  ABUNA MC 230 kV RTB 230 kV 30 Mvar ABUNA RT4 RO RB FT RTB 230 kV 30 Mvar ABUNA RT4 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,044.80
  ABUNA MC 230 kV RTL 230 kV 30 Mvar ABUNA RT1 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  ABUNA MC 230 kV RTL 230 kV 30 Mvar ABUNA RT2 RO RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  ABUNA MC 230 kV RTL 230 kV 30 Mvar ABUNA RT3 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 201,809.64
  ABUNA MC 230 kV RTL 230 kV 30 Mvar ABUNA RT5 RO RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 201,809.64
  ABUNA MC 230 kV TR 230/138 kV ABUNA TR1 RO RBF FT TR 230/138 kV ABUNA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,775.24
  ABUNA MC 230 kV TR 230/138 kV ABUNA TR2 RO RBF FT TR 230/138 kV ABUNA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,775.24
  ABUNA MC 69 kV RTN 69 kV 0 Mvar ABUNA RN2 RO RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,271.34
  ABUNA MG 230 kV ABUNA MG1 RO RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 427,069.75
  ABUNA MG 230 kV ABUNA MG1 RO RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RBNI REA 5679/2016 18/12/2017 17/12/2047 196,149.87
  ABUNA MG 230 kV ABUNA MG1 RO RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RMEL REN 443/2011 9/1/2016 31/08/2033 53,034.20
  ABUNA MG 230 kV ABUNA MG1 RO RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RBNI REA 3216/2011 1/12/2014 1/11/2042 141,994.02
  ABUNA MG 230 kV ABUNA MG1 RO RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RBNI REA 3216/2011 1/12/2014 1/11/2042 64,936.23
  ABUNA RTB 230 kV 30 Mvar ABUNA RT4 RO RB FT RTB 230 kV 30 Mvar ABUNA RT4 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 228,110.37
  ABUNA RTL 230 kV 0 Mvar ABUNA RLR RO RB FT RTL 230 kV 30 Mvar ABUNA RLR RO 058/2001 IPCA RBNI REA 5679/2016 18/12/2017 17/12/2052 671,802.94
  ABUNA RTL 230 kV 30 Mvar ABUNA RT1 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 228,110.37
  ABUNA RTL 230 kV 30 Mvar ABUNA RT2 RO RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 228,110.37
  ABUNA RTL 230 kV 30 Mvar ABUNA RT3 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 613,404.53
  ABUNA RTL 230 kV 30 Mvar ABUNA RT5 RO RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 613,404.53
  ABUNA RTN 69 kV 0 Mvar ABUNA RN2 RO RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  ABUNA TR 230/138 kV ABUNA TR1 RO RBF FT TR 230/138 kV ABUNA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 271,508.47
  ABUNA TR 230/138 kV ABUNA TR2 RO RBF FT TR 230/138 kV ABUNA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 271,508.47
  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2045 494,003.06
  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 202,955.64
  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 157,671.96

 

105 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 405,194.54
  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 202,955.64
  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 157,671.96
  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 405,194.54
  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2048 488,029.31
  ALTAMIRA EL 69 kV ALTAMIRA  CELPA C2 DIT   058/2001 IPCA RCDM REN 443/2011 10/1/2018 30/09/2046 319,281.85
  ALTAMIRA EL 69 kV ALTAMIRA  DIST1 DIT   058/2001 IPCA RCDM REA 3361/2012 21/06/2016 20/06/2046 359,843.36
  ALTAMIRA EL 69 kV ALTAMIRA  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 70,005.58
  ALTAMIRA EL 69 kV ALTAMIRA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 54,902.80
  ALTAMIRA EL 69 kV ALTAMIRA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 142,332.24
  ALTAMIRA IB 230 kV MG 230 kV ALTAMIRA MG1 PA IB1 RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2049 671,110.95
  ALTAMIRA IB 69 kV MG 230 kV ALTAMIRA MG1 PA IB1 DIT   058/2001 IPCA RCDM REA 3361/2012 21/06/2016 20/06/2048 265,511.57
  ALTAMIRA MC 230 kV RTB 230 kV 30 Mvar ALTAMIRA RT2 PA RB FT RTB 230 kV 30 Mvar ALTAMIRA RT2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,044.80
  ALTAMIRA MC 230 kV RTB 230 kV 30 Mvar ALTAMIRA RT2 PA RB FT RTB 230 kV 30 Mvar ALTAMIRA RT2 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2047 386,021.86
  ALTAMIRA MC 230 kV RTL 230 kV 30 Mvar ALTAMIRA RT1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 136,467.78
  ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 106,018.94
  ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 272,453.62
  ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBNI REA 3361/2012 7/11/2016 7/10/2045 1,054,305.10
  ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2047 608,591.48
  ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 136,467.78
  ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TR3 PA RBF FT TR 230/69 kV ALTAMIRA TR3 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2046 859,149.10
  ALTAMIRA MC 69 kV TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBNI REA 3361/2012 7/11/2016 7/10/2045 362,242.50
  ALTAMIRA MC 69 kV TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2046 278,422.89
  ALTAMIRA MC 69 kV TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  ALTAMIRA MC 69 kV TR 230/69 kV ALTAMIRA TR3 PA RBF FT TR 230/69 kV ALTAMIRA TR3 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2046 364,186.35
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 454,552.96
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 353,132.62
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 907,500.67
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2043 527,765.53
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2045 174,856.45
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2043 99,032.13
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REN 443/2011 10/1/2018 30/09/2049 36,565.41
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2043 43,801.17
  ALTAMIRA RTB 230 kV 30 Mvar ALTAMIRA RT2 PA RB FT RTB 230 kV 30 Mvar ALTAMIRA RT2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 228,110.37
  ALTAMIRA RTL 230 kV 30 Mvar ALTAMIRA RT1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2041 22,503.41
  ALTAMIRA RTL 230 kV 30 Mvar ALTAMIRA RT1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,740.23
  ALTAMIRA RTL 230 kV 30 Mvar ALTAMIRA RT1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 277,920.85
  ALTAMIRA RTL 230 kV 30 Mvar ALTAMIRA RT1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 714,217.11
  ALTAMIRA TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 272,128.15
  ALTAMIRA TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 211,410.62
  ALTAMIRA TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 543,295.27
  ALTAMIRA TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBNI REA 4512/2014 4/7/2014 4/6/2038 7,552.11
  ALTAMIRA TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBNI REA 4512/2014 4/7/2014 4/6/2038 7,552.11
  ALTAMIRA TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 272,128.15
  ALTAMIRA TR 230/69 kV ALTAMIRA TR3 PA RBF FT TR 230/69 kV ALTAMIRA TR3 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2050 1,091,089.46
  ALUMAR EL 230 kV ALUMAR LT 230 kV SAO LUIS II /ALUMAR C-1 MA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 214,869.33
  ALUMAR EL 230 kV ALUMAR LT 230 kV SAO LUIS II /ALUMAR C-2 MA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 214,869.33
  ARARAQUARA 2 BF 500 kV 0 Mvar ARARAQUARA 2 GF1 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 7,421,712.64
  ARARAQUARA 2 BF 500 kV 0 Mvar ARARAQUARA 2 GF2 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 7,421,712.64
  ARARAQUARA 2 BF 500 kV 0 Mvar ARARAQUARA 2 GF3 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 7,421,712.64
  ARARAQUARA 2 BF 500 kV 0 Mvar ARARAQUARA 2 GF4 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 7,421,712.64
  ARARAQUARA 2 CV 600/600 kV ARARAQUARA 2 CC1 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 47,109,824.67
  ARARAQUARA 2 CV 600/600 kV ARARAQUARA 2 CC2 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 47,109,824.67
  ARARAQUARA 2 IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB6 RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 228,748.08
  ARARAQUARA 2 IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB7 RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 228,748.08
  ARARAQUARA 2 IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB8 RB FT MG 500 kV ARARAQUARA 2 MG2 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 228,748.08
  ARARAQUARA 2 IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB9 RB FT MG 500 kV ARARAQUARA 2 MG2 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 228,748.08
  ARARAQUARA 2 MC 500 kV BF 500 kV 0 Mvar ARARAQUARA 2 GF1 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 527,175.11
  ARARAQUARA 2 MC 500 kV BF 500 kV 0 Mvar ARARAQUARA 2 GF2 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 527,175.11
  ARARAQUARA 2 MC 500 kV BF 500 kV 0 Mvar ARARAQUARA 2 GF3 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 527,175.11
  ARARAQUARA 2 MC 500 kV BF 500 kV 0 Mvar ARARAQUARA 2 GF4 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 527,175.11
  ARARAQUARA 2 MC 500 kV CV 600/600 kV ARARAQUARA 2 CC1 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 593,685.67
  ARARAQUARA 2 MC 500 kV CV 600/600 kV ARARAQUARA 2 CC2 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 593,685.67
  ARIQUEMES EL 230 kV ARIQUEMES LT 230 kV ARIQUEMES /JARU C-1 RO RB FT LT 230 kV ARIQUEMES /JARU C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  ARIQUEMES EL 230 kV ARIQUEMES LT 230 kV ARIQUEMES /JI-PARANA C-3 RO RB FT LT 230 kV ARIQUEMES /JI-PARANA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 601,335.31
  ARIQUEMES EL 230 kV ARIQUEMES LT 230 kV SAMUEL /ARIQUEMES C-1 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  ARIQUEMES EL 230 kV ARIQUEMES LT 230 kV SAMUEL /ARIQUEMES C-3 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 601,335.31
  ARIQUEMES EL 69 kV ARIQUEMES  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 70,005.58
  ARIQUEMES IB 230 kV MG 230 kV ARIQUEMES MG1 RO IB1 RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  ARIQUEMES MC 230 kV RTB 230 kV 20,00 Mvar ARIQUEMES RB1 RO RB FT RTB 230 kV 20 Mvar ARIQUEMES RB1 RO 058/2001 IPCA RBNI REA 7814/2019 13/05/2021 13/05/2045 878,773.73
  ARIQUEMES MC 230 kV RTL 230 kV 0 Mvar ARIQUEMES RT3 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 197,047.17
  ARIQUEMES MC 230 kV RTL 230 kV 20 Mvar ARIQUEMES RT1 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  ARIQUEMES MC 230 kV RTN 230 kV 0,1 Mvar ARIQUEMES RN1 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,271.34
  ARIQUEMES MC 230 kV TR 230/69 kV ARIQUEMES TR1 RO RBF FT TR 230/69 kV ARIQUEMES TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  ARIQUEMES MC 230 kV TR 230/69 kV ARIQUEMES TR2 RO RBF FT TR 230/69 kV ARIQUEMES TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  ARIQUEMES MC 230 kV TR 230/69 kV ARIQUEMES TR3 RO RBF FT TR 230/69 kV ARIQUEMES TR3 RO 058/2001 IPCA RBNI REA 5678/2016 3/5/2018 3/4/2041 640,648.74
  ARIQUEMES MC 69 kV TR 230/69 kV ARIQUEMES TR1 RO RBF FT TR 230/69 kV ARIQUEMES TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  ARIQUEMES MC 69 kV TR 230/69 kV ARIQUEMES TR1 RO RBF FT TR 230/69 kV ARIQUEMES TR1 RO 058/2001 IPCA RBNI REA 3470/2012 4/8/2015 4/7/2055 6,550.88
  ARIQUEMES MC 69 kV TR 230/69 kV ARIQUEMES TR2 RO RBF FT TR 230/69 kV ARIQUEMES TR2 RO 058/2001 IPCA RBNI REA 3470/2012 4/8/2015 4/7/2055 6,550.88
  ARIQUEMES MC 69 kV TR 230/69 kV ARIQUEMES TR2 RO RBF FT TR 230/69 kV ARIQUEMES TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  ARIQUEMES MC 69 kV TR 230/69 kV ARIQUEMES TR3 RO RBF FT TR 230/69 kV ARIQUEMES TR3 RO 058/2001 IPCA RBNI REA 5678/2016 3/5/2018 3/4/2041 286,530.82
  ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBNI REA 7814/2019 13/05/2021 13/05/2052 110,000.32
  ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBNI REA 5678/2016 3/5/2018 3/4/2041 39,146.72
  ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBNI REA 5678/2016 3/5/2018 3/4/2049 66,829.77
  ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBNI REA 5678/2016 3/5/2018 3/4/2049 17,253.70
  ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBNI REA 5678/2016 3/5/2018 3/4/2049 17,253.70
  ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RMEL REN 443/2011 9/1/2016 31/08/2033 21,070.59
  ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 413,562.28
  ARIQUEMES RTB 230 kV 20,00 Mvar ARIQUEMES RB1 RO RB FT RTB 230 kV 20 Mvar ARIQUEMES RB1 RO 058/2001 IPCA RBNI REA 7814/2019 13/05/2021 13/05/2056 439,802.05
  ARIQUEMES RTL 230 kV 0 Mvar ARIQUEMES RT3 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 593,832.01
  ARIQUEMES RTL 230 kV 20 Mvar ARIQUEMES RT1 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,023.72
  ARIQUEMES RTN 230 kV 0,1 Mvar ARIQUEMES RN1 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  ARIQUEMES TR 230/69 kV ARIQUEMES TR1 RO RBF FT TR 230/69 kV ARIQUEMES TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 272,128.15
  ARIQUEMES TR 230/69 kV ARIQUEMES TR2 RO RBF FT TR 230/69 kV ARIQUEMES TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 272,128.15
  ARIQUEMES TR 230/69 kV ARIQUEMES TR3 RO RBF FT TR 230/69 kV ARIQUEMES TR3 RO 058/2001 IPCA RBNI REA 5678/2016 3/5/2018 3/4/2052 1,076,093.22
  BALSAS EL 230 kV BALSAS LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA RB FT LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 267,611.65
  BALSAS EL 69 kV BALSAS  DIST1 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 43,067.87
  BALSAS EL 69 kV BALSAS  DIST2 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 43,067.87
  BALSAS EL 69 kV BALSAS  DIST3 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 43,067.87
  BALSAS EL 69 kV BALSAS  DIST4 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 43,067.87
  BALSAS EL 69 kV BALSAS  SE BALSAS III DIT   001/2009 IPCA RCDM REN 443/2011 16/08/2017 15/08/2045 261,889.62
  BALSAS IB 230 kV MG 230 kV BALSAS MG1 MA IB1 RB FT MG 230 kV BALSAS MG1 MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 128,411.59
  BALSAS IB 69 kV MG 230 kV BALSAS MG1 MA IB1 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 20,488.16
  BALSAS MC 13,8 kV TR 230/69 kV BALSAS TR2 MA RBF FT TR 230/69 kV BALSAS TR2 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2046 60,794.99
  BALSAS MC 230 kV TR 230/69 kV BALSAS TR1 MA RBF FT TR 230/69 kV BALSAS TR1 MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 232,231.93
  BALSAS MC 230 kV TR 230/69 kV BALSAS TR2 MA RBF FT TR 230/69 kV BALSAS TR2 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2039 804,053.92
  BALSAS MC 69 kV TR 230/69 kV BALSAS TR1 MA RBF FT TR 230/69 kV BALSAS TR1 MA 001/2009 IPCA RBNI REA 4745/2014 15/07/2016 15/07/2047 31,435.00
  BALSAS MC 69 kV TR 230/69 kV BALSAS TR1 MA RBF FT TR 230/69 kV BALSAS TR1 MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 42,442.93
  BALSAS MC 69 kV TR 230/69 kV BALSAS TR2 MA RBF FT TR 230/69 kV BALSAS TR2 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2039 372,264.15

 

106 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  BALSAS MC 69 kV TT 69/0 kV BALSAS TT1 MA DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 24,803.91
  BALSAS MG 230 kV BALSAS MG1 MA RB FT MG 230 kV BALSAS MG1 MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 849,900.02
  BALSAS MG 230 kV BALSAS MG1 MA RB FT MG 230 kV BALSAS MG1 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2047 133,592.77
  BALSAS MG 230 kV BALSAS MG1 MA RB FT MG 230 kV BALSAS MG1 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2047 38,291.24
  BALSAS MG 230 kV BALSAS MG1 MA RB FT MG 230 kV BALSAS MG1 MA 001/2009 IPCA RBNI REN 443/2011 16/08/2017 15/08/2048 31,266.93
  BALSAS TR 230/69 kV BALSAS TR1 MA RBF FT TR 230/69 kV BALSAS TR1 MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 334,258.49
  BALSAS TR 230/69 kV BALSAS TR2 MA RBF FT TR 230/69 kV BALSAS TR2 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2050 1,765,755.45
  BALSAS TT 69/0 kV BALSAS TT1 MA DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 99,213.91
  BARRA PEIXE BC 230 kV 120 Mvar BARRA PEIXE BC1 MT RB FT BC 230 kV 120 Mvar BARRA PEIXE BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 259,220.67
  BARRA PEIXE BC 230 kV 35 Mvar BARRA PEIXE BC2 MT RB FT BC 230 kV 35 Mvar BARRA PEIXE BC2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,040.77
  BARRA PEIXE BC 230 kV 37 Mvar BARRA PEIXE BC3 MT RB FT BC 230 kV 37 Mvar BARRA PEIXE BC3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 164,513.80
  BARRA PEIXE EL 13,8 kV BARRA PEIXE  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  BARRA PEIXE EL 13,8 kV BARRA PEIXE  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,575.58
  BARRA PEIXE EL 138 kV BARRA PEIXE  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 169,270.79
  BARRA PEIXE EL 138 kV BARRA PEIXE  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 132,752.83
  BARRA PEIXE EL 138 kV BARRA PEIXE  DIST2 DIT   058/2001 IPCA RCDM REA 2384/2010 28/11/2012 27/11/2043 621,041.46
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 167,801.30
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 431,225.49
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 167,801.30
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 431,225.49
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  BARRA PEIXE IB 138 kV MG 230 kV BARRA PEIXE MG1 MT IB1 DIT   058/2001 IPCA RCDM REA 2384/2010 24/10/2012 23/10/2043 469,969.58
  BARRA PEIXE IB 230 kV MG 230 kV BARRA PEIXE MG1 MT IB1 RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  BARRA PEIXE MC 138 kV TR 230/138 kV BARRA PEIXE TR2 MT RBF FT TR 230/138 kV BARRA PEIXE TR2 MT 058/2001 IPCA RBNI REA 2384/2010 24/10/2012 23/10/2044 578,538.62
  BARRA PEIXE MC 138 kV TR 230/138 kV BARRA PEIXE TR3 MT RBF FT TR 230/138 kV BARRA PEIXE TR3 MT 058/2001 IPCA RBNI REA 2384/2010 28/11/2012 27/11/2042 580,549.77
  BARRA PEIXE MC 138 kV TR 230/138 kV BARRA PEIXE TR4 MT RBF FT TR 230/138 kV BARRA PEIXE TR4 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2039 488,365.07
  BARRA PEIXE MC 138 kV TR 230/138 kV BARRA PEIXE TR5 MT RBF FT TR 230/138 kV BARRA PEIXE TR5 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2039 488,365.07
  BARRA PEIXE MC 230 kV RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,194.36
  BARRA PEIXE MC 230 kV RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 113,575.32
  BARRA PEIXE MC 230 kV RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 291,872.44
  BARRA PEIXE MC 230 kV RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT RB FT RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  BARRA PEIXE MC 230 kV RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT RB FT RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBNI REA 2384/2010 28/11/2012 27/11/2040 157,631.43
  BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 118,106.27
  BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR2 MT RBF FT TR 230/138 kV BARRA PEIXE TR2 MT 058/2001 IPCA RBNI REA 2384/2010 24/10/2012 23/10/2042 776,672.03
  BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR3 MT RBF FT TR 230/138 kV BARRA PEIXE TR3 MT 058/2001 IPCA RBNI REA 2384/2010 28/11/2012 27/11/2042 779,041.76
  BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR4 MT RBF FT TR 230/138 kV BARRA PEIXE TR4 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2042 599,515.40
  BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR5 MT RBF FT TR 230/138 kV BARRA PEIXE TR5 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2042 599,515.40
  BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 541,017.59
  BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2050 114,267.72
  BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2049 71,352.50
  BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2042 60,745.92
  BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2051 81,528.17
  BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 420,305.17
  BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBNI REA 2384/2010 24/10/2012 23/10/2039 1,006,456.14
  BARRA PEIXE RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,506.77
  BARRA PEIXE RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 221,804.19
  BARRA PEIXE RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 570,005.26
  BARRA PEIXE RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT RB FT RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,506.77
  BARRA PEIXE RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT RB FT RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT 058/2001 IPCA RMEL REN 443/2011 6/5/2017 6/4/2031 76,073.31
  BARRA PEIXE RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT RB FT RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,506.77
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 393,052.38
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 305,354.11
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 784,716.69
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TR2 MT RBF FT TR 230/138 kV BARRA PEIXE TR2 MT 058/2001 IPCA RBNI REA 2384/2010 24/10/2012 23/10/2046 883,756.27
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TR3 MT RBF FT TR 230/138 kV BARRA PEIXE TR3 MT 058/2001 IPCA RBNI REA 2384/2010 28/11/2012 27/11/2046 885,814.66
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TR4 MT RBF FT TR 230/138 kV BARRA PEIXE TR4 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2052 1,345,323.41
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TR5 MT RBF FT TR 230/138 kV BARRA PEIXE TR5 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2052 1,345,323.41
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TRR1 MT RBF FT TR 230/138 kV BARRA PEIXE TRR1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 261,600.31
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TRR1 MT RBF FT TR 230/138 kV BARRA PEIXE TRR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,031.53
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TRR1 MT RBF FT TR 230/138 kV BARRA PEIXE TRR1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 101,795.63
  BOA VISTA IB 230 kV MG 230 kV BOA VISTA MG2 RR IB1 RB FT MG 230 kV BOA VISTA MG2 RR 058/2001 IPCA RBNI REA 3587/2012 6/1/2016 31/05/2048 712,157.71
  BOA VISTA MC 230 kV TR 230/69 kV BOA VISTA TR1 RR RBF FT TR 230/69 kV BOA VISTA TR1 RR 058/2001 IPCA RBNI REA 3587/2012 6/1/2016 31/05/2046 551,049.84
  BOA VISTA MC 230 kV TR 230/69 kV BOA VISTA TR2 RR RBF FT TR 230/69 kV BOA VISTA TR2 RR 058/2001 IPCA RBNI REA 3587/2012 6/1/2016 31/05/2046 551,073.00
  BOA VISTA MC 230 kV TR 230/69 kV BOA VISTA TR3 RR DIT   058/2001 IPCA RCDM DSP 3687/2017 18/06/2015 17/06/2039 536,024.73
  BOA VISTA MC 69 kV TR 230/69 kV BOA VISTA TR1 RR RBF FT TR 230/69 kV BOA VISTA TR1 RR 058/2001 IPCA RBNI REA 3587/2012 6/1/2016 31/05/2044 78,289.98
  BOA VISTA MC 69 kV TR 230/69 kV BOA VISTA TR2 RR RBF FT TR 230/69 kV BOA VISTA TR2 RR 058/2001 IPCA RBNI REA 3587/2012 6/1/2016 31/05/2044 78,244.68
  BOA VISTA MC 69 kV TR 230/69 kV BOA VISTA TR3 RR DIT   058/2001 IPCA RCDM DSP 3687/2017 18/06/2015 17/06/2038 220,328.78
  BOA VISTA MG 230 kV BOA VISTA MG2 RR RB FT MG 230 kV BOA VISTA MG2 RR 058/2001 IPCA RBNI REA 3587/2012 6/1/2016 31/05/2044 402,839.84
  BOA VISTA MG 230 kV BOA VISTA MG2 RR RB FT MG 230 kV BOA VISTA MG2 RR 058/2001 IPCA RBNI DSP 3687/2017 7/5/2015 7/5/2047 16,079.20
  BOA VISTA TR 230/69 kV BOA VISTA TR3 RR DIT   058/2001 IPCA RCDM DSP 3687/2017 18/06/2015 17/06/2050 1,305,911.98
  C. MAGALHAES EL 13,8 kV C. MAGALHAES  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  C. MAGALHAES EL 13,8 kV C. MAGALHAES  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  C. MAGALHAES EL 138 kV C. MAGALHAES LT 138 kV C. MAGALHAES /RONDONOPOLIS C-1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 117,669.41
  C. MAGALHAES EL 138 kV C. MAGALHAES LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 117,669.41
  C. MAGALHAES MC 13,8 kV TR 138/13,8 kV C. MAGALHAES TR1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,119.20
  C. MAGALHAES MC 138 kV RTB 138 kV 5 Mvar C. MAGALHAES RT1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 103,288.88
  C. MAGALHAES MC 138 kV RTB 138 kV 5 Mvar C. MAGALHAES RT2 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 103,288.88
  C. MAGALHAES MC 138 kV TR 138/13,8 kV C. MAGALHAES TR1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 103,963.91
  C. MAGALHAES MG 138 kV C. MAGALHAES MG1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 313,172.30
  C. MAGALHAES RTB 138 kV 5 Mvar C. MAGALHAES RT1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 126,652.89
  C. MAGALHAES RTB 138 kV 5 Mvar C. MAGALHAES RT1 MT DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 99,329.19
  C. MAGALHAES RTB 138 kV 5 Mvar C. MAGALHAES RT2 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 126,652.89
  C. MAGALHAES RTB 138 kV 5 Mvar C. MAGALHAES RT2 MT DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 99,329.19
  C. MAGALHAES RTB 138 kV 5 Mvar C. MAGALHAES RT2 MT DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 257,505.01
  C. MAGALHAES TR 138/13,8 kV C. MAGALHAES TR1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,561.82
  C. MAGALHAES TR 138/13,8 kV C. MAGALHAES TR1 MT DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 56,907.56
  CARAJAS BC 230 kV 30 MVAr CARAJAS BC1 PA RB FT BC 230 kV 30 MVAr CARAJAS BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 147,632.60
  CARAJAS EL 230 kV CARAJAS  CONS1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 220,577.33
  CARAJAS EL 230 kV CARAJAS LT 230 kV CARAJAS /INTEGRADORA C-1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 220,577.33
  CARAJAS EL 230 kV CARAJAS LT 230 kV CARAJAS /INTEGRADORA C-2 PA RB FT LT 230 kV CARAJAS /INTEGRADORA C-2 PA 058/2001 IPCA RBNI REA 4658/2014 9/2/2013 31/12/2042 266,159.54
  CARAJAS EL 230 kV CARAJAS LT 230 kV CARAJAS /MARABA C-1 PA RB FT LT 230 kV CARAJAS /MARABA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  CARAJAS IB 230 kV MG 230 kV CARAJAS MG1 PA IB1 RB FT MG 230 kV CARAJAS MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  CARAJAS MC 230 kV BC 230 kV 30 MVAr CARAJAS BC1 PA RB FT BC 230 kV 30 MVAr CARAJAS BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,390.09
  CARAJAS MG 230 kV CARAJAS MG1 PA RB FT MG 230 kV CARAJAS MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 394,461.44
  CASTANHAL EL 230 kV CASTANHAL LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2042 861,509.60
  CASTANHAL EL 230 kV CASTANHAL LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2042 861,562.49
  CASTANHAL MG 230 kV CASTANHAL MG2 PA RB FT MG 230 kV CASTANHAL MG2 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2033 519,476.41
  COELHO NETO EL 230 kV COELHO NETO LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 210,404.74
  COELHO NETO EL 230 kV COELHO NETO LT 230 kV PERITORO /COELHO NETO C-1 MA RB FT LT 230 kV PERITORO /COELHO NETO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 210,404.74
  COELHO NETO IB 230 kV MG 230 kV COELHO NETO MG1 MA IB1 RB FT MG 230 kV COELHO NETO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 114,580.72
  COELHO NETO MC 230 kV RTL 230 kV 20 MVAr COELHO NETO RT1 MA RB FT RTL 230 kV 20 MVAr COELHO NETO RT1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  COELHO NETO MC 230 kV RTL 230 kV 5 MVAr COELHO NETO RT2 MA RB FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  COELHO NETO MC 230 kV TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,775.24
  COELHO NETO MC 230 kV TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 112,472.84
  COELHO NETO MC 230 kV TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 289,039.21

 

107 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  COELHO NETO MC 230 kV TR 230/69 kV COELHO NETO TF2 MA RBF FT TR 230/69 kV COELHO NETO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,775.24
  COELHO NETO MG 230 kV COELHO NETO MG1 MA RB FT MG 230 kV COELHO NETO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 412,700.73
  COELHO NETO MG 230 kV COELHO NETO MG1 MA RB FT MG 230 kV COELHO NETO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 320,618.50
  COELHO NETO MG 230 kV COELHO NETO MG1 MA RB FT MG 230 kV COELHO NETO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 823,944.00
  COELHO NETO RTL 230 kV 20 MVAr COELHO NETO RT1 MA RB FT RTL 230 kV 20 MVAr COELHO NETO RT1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,023.72
  COELHO NETO RTL 230 kV 5 MVAr COELHO NETO RT2 MA RB FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,538.91
  COELHO NETO RTL 230 kV 5 MVAr COELHO NETO RT2 MA RB FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 29,940.06
  COELHO NETO RTL 230 kV 5 MVAr COELHO NETO RT2 MA RB FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 76,941.71
  COELHO NETO TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,248.42
  COELHO NETO TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 220,826.61
  COELHO NETO TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 567,493.01
  COELHO NETO TR 230/69 kV COELHO NETO TF2 MA RBF FT TR 230/69 kV COELHO NETO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,248.42
  COELHO NETO TR 230/69 kV COELHO NETO TF2 MA RBF FT TR 230/69 kV COELHO NETO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 220,826.61
  COELHO NETO TR 230/69 kV COELHO NETO TF2 MA RBF FT TR 230/69 kV COELHO NETO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 567,493.01
  COLETORA PORTO VELHO BF 230 kV 0 Mvar COLETORA PORTO VELHO FH71 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 1,874,417.36
  COLETORA PORTO VELHO BF 230 kV 0 Mvar COLETORA PORTO VELHO FH72 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 1,874,417.36
  COLETORA PORTO VELHO BF 230 kV 0 Mvar COLETORA PORTO VELHO FH73 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 1,874,417.36
  COLETORA PORTO VELHO BF 230 kV 0 Mvar COLETORA PORTO VELHO FH74 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 1,874,417.36
  COLETORA PORTO VELHO BF 500 kV 0 Mvar COLETORA PORTO VELHO FH41 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 15,938,964.67
  COLETORA PORTO VELHO BF 500 kV 0 Mvar COLETORA PORTO VELHO FH44 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 4,998,443.43
  COLETORA PORTO VELHO BF 500 kV 0 Mvar COLETORA PORTO VELHO FH51 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 15,938,964.67
  COLETORA PORTO VELHO BF 500 kV 0 Mvar COLETORA PORTO VELHO FH54 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 2,499,221.71
  COLETORA PORTO VELHO CV 500/230 kV COLETORA PORTO VELHO BTB1 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 28,195,170.90
  COLETORA PORTO VELHO CV 500/230 kV COLETORA PORTO VELHO BTB2 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 28,195,170.90
  COLETORA PORTO VELHO CV 600/600 kV COLETORA PORTO VELHO CC1 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 50,323,411.10
  COLETORA PORTO VELHO CV 600/600 kV COLETORA PORTO VELHO CC2 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 50,323,411.10
  COLETORA PORTO VELHO EL 230 kV COLETORA PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 332,503.24
  COLETORA PORTO VELHO EL 230 kV COLETORA PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 332,503.24
  COLETORA PORTO VELHO IB 230 kV MG 500 kV COLETORA PORTO VELHO MG1 RO IB1 RB FT MG 500 kV COLETORA PORTO VELHO MG1 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 159,549.36
  COLETORA PORTO VELHO IB 500 kV MG 500 kV COLETORA PORTO VELHO MG1 RO IB1 RB FT MG 500 kV COLETORA PORTO VELHO MG1 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 265,296.75
  COLETORA PORTO VELHO IB 500 kV MG 500 kV COLETORA PORTO VELHO MG2 RO IB2 RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 228,748.08
  COLETORA PORTO VELHO IB 500 kV MG 500 kV COLETORA PORTO VELHO MG2 RO IB3 RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 228,748.08
  COLETORA PORTO VELHO MC 230 kV BF 230 kV 0 Mvar COLETORA PORTO VELHO FH71 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 251,336.13
  COLETORA PORTO VELHO MC 230 kV BF 230 kV 0 Mvar COLETORA PORTO VELHO FH72 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 251,336.13
  COLETORA PORTO VELHO MC 230 kV BF 230 kV 0 Mvar COLETORA PORTO VELHO FH73 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 251,336.13
  COLETORA PORTO VELHO MC 230 kV BF 230 kV 0 Mvar COLETORA PORTO VELHO FH74 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 251,336.13
  COLETORA PORTO VELHO MC 230 kV CV 500/230 kV COLETORA PORTO VELHO BTB1 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 288,544.49
  COLETORA PORTO VELHO MC 230 kV CV 500/230 kV COLETORA PORTO VELHO BTB2 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 288,544.49
  COLETORA PORTO VELHO MC 500 kV BF 500 kV 0 Mvar COLETORA PORTO VELHO FH41 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 527,175.11
  COLETORA PORTO VELHO MC 500 kV BF 500 kV 0 Mvar COLETORA PORTO VELHO FH51 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 527,175.11
  COLETORA PORTO VELHO MC 500 kV CV 500/230 kV COLETORA PORTO VELHO BTB1 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 688,542.97
  COLETORA PORTO VELHO MC 500 kV CV 500/230 kV COLETORA PORTO VELHO BTB2 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 688,542.97
  COLETORA PORTO VELHO MC 500 kV CV 600/600 kV COLETORA PORTO VELHO CC1 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 593,685.67
  COLETORA PORTO VELHO MC 500 kV CV 600/600 kV COLETORA PORTO VELHO CC2 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 4/1/2013 26/02/2039 593,685.67
  COLETORA PORTO VELHO MG 500 kV COLETORA PORTO VELHO MG1 RO RB FT MG 500 kV COLETORA PORTO VELHO MG1 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 4,302,761.51
  COLINAS CR 500 kV 161 MVAr COLINAS BC1 TO RB FT CR 500 kV 161 MVAr COLINAS BC1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 542,548.07
  COLINAS CR 500 kV 161 MVAr COLINAS BC1 TO RB FT CR 500 kV 161 MVAr COLINAS BC1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 421,494.17
  COLINAS CR 500 kV 161 MVAr COLINAS BC1 TO RB FT CR 500 kV 161 MVAr COLINAS BC1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,083,180.13
  COLINAS CR 500 kV 161 MVAr COLINAS BC2 TO RB FT CR 500 kV 161 MVAr COLINAS BC2 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 542,548.07
  COLINAS CR 500 kV 161 MVAr COLINAS BC2 TO RB FT CR 500 kV 161 MVAr COLINAS BC2 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 421,494.17
  COLINAS CR 500 kV 161 MVAr COLINAS BC2 TO RB FT CR 500 kV 161 MVAr COLINAS BC2 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,083,180.13
  COLINAS EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBNI REA 5861/2016 6/3/2019 6/2/2034 12,449.96
  COLINAS EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  COLINAS EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,896.56
  COLINAS EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 927,452.89
  COLINAS EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBNI REA 5861/2016 6/5/2019 6/4/2034 12,449.96
  COLINAS EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  COLINAS EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,896.56
  COLINAS EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 927,452.89
  COLINAS IB 500 kV MG 500 kV COLINAS MG2 TO IB1 RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  COLINAS IB 500 kV MG 500 kV COLINAS MG2 TO IB1 RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  COLINAS IB 500 kV MG 500 kV COLINAS MG2 TO IB1 RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 868,670.25
  COLINAS MC 500 kV RTB 500 kV 165 Mvar COLINAS RT4 TO RB FT RTB 500 kV 165 Mvar COLINAS RT4 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 351,205.79
  COLINAS MC 500 kV RTL 500 kV 136 MVAr COLINAS RT1 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  COLINAS MC 500 kV RTL 500 kV 136 MVAr COLINAS RT2 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  COLINAS MG 500 kV COLINAS MG2 TO RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 894,568.97
  COLINAS MG 500 kV COLINAS MG2 TO RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 694,971.79
  COLINAS MG 500 kV COLINAS MG2 TO RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,785,978.77
  COLINAS RTB 500 kV 165 Mvar COLINAS RT4 TO RB FT RTB 500 kV 165 Mvar COLINAS RT4 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 788,678.61
  COLINAS RTB 500 kV 165 Mvar COLINAS RT4 TO RB FT RTB 500 kV 165 Mvar COLINAS RT4 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 612,707.80
  COLINAS RTB 500 kV 165 Mvar COLINAS RT4 TO RB FT RTB 500 kV 165 Mvar COLINAS RT4 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,574,572.00
  COLINAS RTB 500 kV 45,45 Mvar COLINAS RTR1 TO RB FT RTB 500 kV 45,45 Mvar COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 247,451.55
  COLINAS RTB 500 kV 45,45 Mvar COLINAS RTR1 TO RB FT RTB 500 kV 45,45 Mvar COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,239.90
  COLINAS RTB 500 kV 45,45 Mvar COLINAS RTR1 TO RB FT RTB 500 kV 45,45 Mvar COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 494,029.23
  COLINAS RTL 500 kV 136 MVAr COLINAS RT1 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 741,730.38
  COLINAS RTL 500 kV 136 MVAr COLINAS RT1 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 576,234.70
  COLINAS RTL 500 kV 136 MVAr COLINAS RT1 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,480,841.32
  COLINAS RTL 500 kV 136 MVAr COLINAS RT2 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 741,730.38
  COLINAS RTL 500 kV 136 MVAr COLINAS RT2 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 576,234.70
  COLINAS RTL 500 kV 136 MVAr COLINAS RT2 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,480,841.32
  COLINAS RTL 500 kV 45,45 MVAr COLINAS RTR1 TO RB FT RTL 500 kV 45,45 MVAr COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 247,451.55
  COLINAS RTL 500 kV 45,45 MVAr COLINAS RTR1 TO RB FT RTL 500 kV 45,45 MVAr COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,239.90
  COLINAS RTL 500 kV 45,45 MVAr COLINAS RTR1 TO RB FT RTL 500 kV 45,45 MVAr COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 494,029.23
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC1 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 52,365.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC1 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 40,681.49
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC1 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 104,545.64
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC2 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 52,365.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC2 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 40,681.49
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC2 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 104,545.64
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC3 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 52,365.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC3 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC3 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 40,681.49
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC3 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC3 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 104,545.64
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC4 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 52,365.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC4 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 40,681.49
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC4 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 104,545.64
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC5 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 52,365.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC5 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 40,681.49
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC5 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 104,545.64
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC6 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 52,365.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC6 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 40,681.49
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC6 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 104,545.64
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC7 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 52,365.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC7 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 40,681.49
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC7 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 104,545.64
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC8 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 52,365.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC8 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 40,681.49
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC8 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 104,545.64
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC9 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 52,365.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC9 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 40,681.49
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC9 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 104,545.64

 

108 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  COXIPO BC 138 kV 35 Mvar COXIPO BCD1 MT DIT   058/2001 IPCA RCDMA REA 8348/2019     267,450.09
  COXIPO BC 138 kV 35 Mvar COXIPO BCD2 MT DIT   058/2001 IPCA RCDMA REA 8348/2019     267,450.09
  COXIPO BC 138 kV 35 Mvar COXIPO BCD3 MT DIT   058/2001 IPCA RCDMA REA 8348/2019     267,450.09
  COXIPO CE 70/-50 MvAr COXIPO CE1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,807,850.38
  COXIPO CE 70/-50 MvAr COXIPO CE1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,404,480.87
  COXIPO CE 70/-50 MvAr COXIPO CE1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,609,316.33
  COXIPO EL 13,8 kV COXIPO  DIST7 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  COXIPO EL 13,8 kV COXIPO  DIST8 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  COXIPO EL 138 kV COXIPO  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 178,706.68
  COXIPO EL 138 kV COXIPO  DIST1 DIT   058/2001 IPCA RCDM REA 5569/2015 2/6/2018 2/6/2049 70,023.17
  COXIPO EL 138 kV COXIPO  DIST1 DIT   058/2001 IPCA RCDM REA 8161/2019 13/09/2019 13/09/2034 36,061.40
  COXIPO EL 138 kV COXIPO  DIST2 DIT   058/2001 IPCA RCDM REA 8161/2019 13/09/2019 13/09/2034 36,061.40
  COXIPO EL 138 kV COXIPO  DIST2 DIT   058/2001 IPCA RCDM REA 5569/2015 2/6/2018 2/6/2049 70,023.17
  COXIPO EL 138 kV COXIPO  DIST2 DIT   058/2001 IPCA RCDM REA 5569/2015 2/6/2018 2/6/2048 37,086.13
  COXIPO EL 138 kV COXIPO  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 178,706.68
  COXIPO EL 138 kV COXIPO  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 178,706.68
  COXIPO EL 138 kV COXIPO  DIST3 DIT   058/2001 IPCA RCDM REA 5569/2015 2/6/2018 2/6/2048 37,086.13
  COXIPO EL 138 kV COXIPO  DIST3 DIT   058/2001 IPCA RCDM REA 5569/2015 2/6/2018 2/6/2049 70,023.17
  COXIPO EL 138 kV COXIPO  DIST3 DIT   058/2001 IPCA RCDM REA 8161/2019 13/09/2019 13/09/2034 36,061.40
  COXIPO EL 138 kV COXIPO  DIST4 DIT   058/2001 IPCA RCDM REA 8161/2019 13/09/2019 13/09/2034 36,061.40
  COXIPO EL 138 kV COXIPO  DIST4 DIT   058/2001 IPCA RCDM REA 5569/2015 2/6/2018 2/6/2049 70,023.17
  COXIPO EL 138 kV COXIPO  DIST4 DIT   058/2001 IPCA RCDM REA 5569/2015 2/6/2018 2/6/2048 37,086.13
  COXIPO EL 138 kV COXIPO  DIST4 DIT   058/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2047 10,023.40
  COXIPO EL 138 kV COXIPO  DIST4 DIT   058/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2047 10,023.40
  COXIPO EL 138 kV COXIPO  DIST4 DIT   058/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2047 10,023.40
  COXIPO EL 138 kV COXIPO  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 178,706.68
  COXIPO EL 138 kV COXIPO  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 178,706.68
  COXIPO EL 138 kV COXIPO  DIST5 DIT   058/2001 IPCA RCDM REA 5569/2015 2/6/2018 2/6/2048 37,086.13
  COXIPO EL 138 kV COXIPO  DIST5 DIT   058/2001 IPCA RCDM REA 8161/2019 13/09/2019 13/09/2034 36,061.40
  COXIPO EL 138 kV COXIPO  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 178,706.68
  COXIPO EL 138 kV COXIPO  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 140,153.05
  COXIPO EL 138 kV COXIPO  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 363,338.46
  COXIPO EL 230 kV COXIPO LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  COXIPO EL 230 kV COXIPO LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 167,801.30
  COXIPO EL 230 kV COXIPO LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 431,225.49
  COXIPO EL 230 kV COXIPO LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBNI REA 2384/2010 20/12/2012 19/12/2037 78,933.69
  COXIPO EL 230 kV COXIPO LT 230 kV RONDONOPOLIS /COXIPO C-1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  COXIPO EL 230 kV COXIPO LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  COXIPO EL 230 kV COXIPO LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 167,801.30
  COXIPO EL 230 kV COXIPO LT 230 kV VARZEA GRANDE /COXIPO C-1 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  COXIPO EL 230 kV COXIPO LT 230 kV VARZEA GRANDE /COXIPO C-2 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT 058/2001 IPCA RBNI REA 4967/2014 21/06/2016 20/06/2044 121,502.11
  COXIPO EL 230 kV COXIPO LT 230 kV VARZEA GRANDE /COXIPO C-2 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  COXIPO IB 138 kV MG 230 kV COXIPO MG1 MT IB1 DIT   058/2001 IPCA RCDM REA 5569/2015 2/7/2018 2/7/2039 292,689.92
  COXIPO IB 138 kV MG 230 kV COXIPO MG1 MT IB1 DIT   058/2001 IPCA RCDM REA 5569/2015 2/7/2018 2/7/2058 53,006.03
  COXIPO IB 230 kV MG 230 kV COXIPO MG1 MT IB1 RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI REA 5569/2015 22/11/2017 21/11/2048 362,819.24
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC1 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,453.45
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC2 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,453.45
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC3 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,453.45
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC4 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,453.45
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC5 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,453.45
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC6 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,453.45
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC7 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,453.45
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC7 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 55,510.68
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC8 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,453.45
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC8 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 55,510.68
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC9 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,453.45
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC9 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 55,510.68
  COXIPO MC 138 kV BC 138 kV 35 Mvar COXIPO BCD1 MT DIT   058/2001 IPCA RCDMA REA 8348/2019     679,352.62
  COXIPO MC 138 kV BC 138 kV 35 Mvar COXIPO BCD2 MT DIT   058/2001 IPCA RCDMA REA 8348/2019     679,352.62
  COXIPO MC 138 kV BC 138 kV 35 Mvar COXIPO BCD3 MT DIT   058/2001 IPCA RCDMA REA 8348/2019     679,352.62
  COXIPO MC 138 kV RTL 138 kV 5 Mvar COXIPO RT1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 69,754.14
  COXIPO MC 138 kV RTL 138 kV 5 Mvar COXIPO RT2 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 69,754.14
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 12/11/2017 12/10/2047 791,063.68
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 10/1/2018 10/1/2040 25,268.81
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR2 MT RBF FT TR 230/138 kV COXIPO TR2 MT 058/2001 IPCA RBNI REA 5569/2015 28/05/2018 28/05/2040 493,476.32
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 10/1/2018 10/1/2040 532,339.73
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 3/1/2019 3/1/2041 25,418.54
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR4 MT RBF FT TR 230/138 kV COXIPO TR4 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,818.80
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR4 MT RBF FT TR 230/138 kV COXIPO TR4 MT 058/2001 IPCA RBNI REA 5569/2015 4/9/2018 4/9/2051 37,000.06
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR5 MT RBF FT TR 230/138 kV COXIPO TR5 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,818.80
  COXIPO MC 230 kV TR 230/12,3 kV COXIPO TF1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  COXIPO MC 230 kV TR 230/12,3 kV COXIPO TF1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 118,106.27
  COXIPO MC 230 kV TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 10/1/2018 10/1/2042 26,835.93
  COXIPO MC 230 kV TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 12/11/2017 12/10/2047 988,282.55
  COXIPO MC 230 kV TR 230/138 kV COXIPO TR2 MT RBF FT TR 230/138 kV COXIPO TR2 MT 058/2001 IPCA RBNI REA 5569/2015 28/05/2018 28/05/2041 663,259.74
  COXIPO MC 230 kV TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 10/1/2018 10/1/2042 637,544.77
  COXIPO MC 230 kV TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 3/1/2019 3/1/2042 26,935.81
  COXIPO MC 230 kV TR 230/138 kV COXIPO TR4 MT RBF FT TR 230/138 kV COXIPO TR4 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  COXIPO MC 230 kV TR 230/138 kV COXIPO TR5 MT RBF FT TR 230/138 kV COXIPO TR5 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 800,964.52
  COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI REA 5569/2015 12/11/2017 12/10/2045 182,074.71
  COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI REA 5569/2015 12/11/2017 12/10/2045 114,658.58
  COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNIA REA 8348/2019     278,406.45
  COXIPO RTL 138 kV 5 Mvar COXIPO RT1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 126,652.89
  COXIPO RTL 138 kV 5 Mvar COXIPO RT1 MT DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 99,329.19
  COXIPO RTL 138 kV 5 Mvar COXIPO RT1 MT DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 257,505.01
  COXIPO RTL 138 kV 5 Mvar COXIPO RT2 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 126,652.89
  COXIPO RTL 138 kV 5 Mvar COXIPO RT2 MT DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 99,329.19
  COXIPO RTL 138 kV 5 Mvar COXIPO RT2 MT DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 257,505.01
  COXIPO RTL 230 kV 30 MVAr COXIPO RT1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,740.23
  COXIPO RTL 230 kV 30 MVAr COXIPO RT1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 277,920.85
  COXIPO RTL 230 kV 30 MVAr COXIPO RT1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 714,217.11
  COXIPO RTL 230 kV 30 Mvar COXIPO RT2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,506.77
  COXIPO TR 230/12,3 kV COXIPO TF1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 295,470.04
  COXIPO TR 230/12,3 kV COXIPO TF1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 229,544.44
  COXIPO TR 230/12,3 kV COXIPO TF1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 589,896.62
  COXIPO TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 12/11/2017 12/10/2050 1,545,497.52
  COXIPO TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 10/1/2018 10/1/2052 24,767.66
  COXIPO TR 230/138 kV COXIPO TR2 MT RBF FT TR 230/138 kV COXIPO TR2 MT 058/2001 IPCA RBNI REA 5569/2015 28/05/2018 28/05/2052 1,542,956.79
  COXIPO TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 3/1/2019 3/1/2053 26,636.64
  COXIPO TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 10/1/2018 10/1/2052 1,518,245.85
  COXIPO TR 230/138 kV COXIPO TR4 MT RBF FT TR 230/138 kV COXIPO TR4 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,322.37
  COXIPO TR 230/138 kV COXIPO TR5 MT RBF FT TR 230/138 kV COXIPO TR5 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,322.37
  COXIPO TR 230/138 kV COXIPO TRR1 MT RBF FT TR 230/138 kV COXIPO TRR1 MT 058/2001 IPCA RBNI REA 5569/2015 22/07/2019 22/07/2053 1,550,382.29
  COXIPO TR 230/138 kV COXIPO TRR1D MT RBF FT TR 230/138 kV COXIPO TRR1D MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,767.09
  COXIPO TR 230/138 kV COXIPO TRR1D MT RBF FT TR 230/138 kV COXIPO TRR1D MT 058/2001 IPCA RBNI REA 8161/2019 13/09/2019 13/09/2044 90,883.74
  CVRD EL 230 kV CVRD LT 230 kV CVRD /SAO LUIS II C-1 PA/MA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 168,514.09
  CVRD EL 230 kV CVRD LT 230 kV CVRD /SAO LUIS II C-1 PA/MA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 436,862.76
  CVRD EL 230 kV CVRD LT 230 kV CVRD /SAO LUIS II C-1 PA/MA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 214,869.33
  GUAMA BC 230 kV 55 Mvar GUAMA BC1 PA RB FT BC 230 kV 55 Mvar GUAMA BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,422.76

 

109 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  GUAMA BC 230 kV 55 Mvar GUAMA BC2 PA RB FT BC 230 kV 55 Mvar GUAMA BC2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,422.76
  GUAMA EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-1 PA RB   058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  GUAMA EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-1 PA RB   058/2001 IPCA RMEL REN 643/2014 14/09/2014 13/09/2044 42,044.37
  GUAMA EL 230 kV GUAMA LT 230 kV GUAMA /UTINGA C-2 PA RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RMEL REN 643/2014 14/10/2015 13/10/2045 43,380.39
  GUAMA EL 230 kV GUAMA LT 230 kV GUAMA /UTINGA C-2 PA RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  GUAMA EL 230 kV GUAMA LT 230 kV VILA DO CONDE /GUAMA C-1 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  GUAMA EL 230 kV GUAMA LT 230 kV VILA DO CONDE /GUAMA C-1 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA 058/2001 IPCA RMEL REN 643/2014 27/07/2014 26/07/2044 41,878.64
  GUAMA EL 230 kV GUAMA LT 230 kV VILA DO CONDE /GUAMA C-2 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  GUAMA IB 230 kV MG 230 kV GUAMA MG1 PA IB1 RB FT MG 230 kV GUAMA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  GUAMA MC 230 kV BC 230 kV 55 Mvar GUAMA BC1 PA RB FT BC 230 kV 55 Mvar GUAMA BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,735.57
  GUAMA MC 230 kV BC 230 kV 55 Mvar GUAMA BC2 PA RB FT BC 230 kV 55 Mvar GUAMA BC2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,735.57
  GUAMA MC 230 kV TR 230/69 kV GUAMA TR1 PA RBF FT TR 230/69 kV GUAMA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  GUAMA MC 230 kV TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  GUAMA MC 230 kV TR 230/69 kV GUAMA TR3 PA RBF FT TR 230/69 kV GUAMA TR3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  GUAMA MC 69 kV TR 230/69 kV GUAMA TR1 PA RBF FT TR 230/69 kV GUAMA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  GUAMA MC 69 kV TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  GUAMA MC 69 kV TR 230/69 kV GUAMA TR3 PA RBF FT TR 230/69 kV GUAMA TR3 PA 058/2001 IPCA RBNI REA 539/2006 2/3/2014 2/2/2043 68,624.80
  GUAMA MG 230 kV GUAMA MG1 PA RB FT MG 230 kV GUAMA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 545,749.41
  GUAMA MG 230 kV GUAMA MG1 PA RB FT MG 230 kV GUAMA MG1 PA 058/2001 IPCA RMEL REN 643/2014 31/10/2014 30/10/2044 14,067.78
  GUAMA MG 230 kV GUAMA MG1 PA RB FT MG 230 kV GUAMA MG1 PA 058/2001 IPCA RMEL REN 643/2014 18/12/2014 17/12/2044 14,121.90
  GUAMA TR 230/69 kV GUAMA TR1 PA RBF FT TR 230/69 kV GUAMA TR1 PA 058/2001 IPCA RMEL REA 2837/2011 3/3/2013 3/2/2047 48,244.87
  GUAMA TR 230/69 kV GUAMA TR1 PA RBF FT TR 230/69 kV GUAMA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 598,406.98
  GUAMA TR 230/69 kV GUAMA TR1 PA RBF FT TR 230/69 kV GUAMA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 464,889.77
  GUAMA TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RMEL REN 443/2011 13/11/2016 11/12/2030 60,092.97
  GUAMA TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RMEL REA 2837/2011 3/3/2013 3/2/2048 38,405.78
  GUAMA TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 598,406.98
  GUAMA TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 464,889.77
  GUAMA TR 230/69 kV GUAMA TR3 PA RBF FT TR 230/69 kV GUAMA TR3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 598,406.98
  GUAMA TR 230/69 kV GUAMA TRR1 PA RBF FT TR 230/69 kV GUAMA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,468.99
  GUAMA TR 230/69 kV GUAMA TRR1 PA RBF FT TR 230/69 kV GUAMA TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 154,963.26
  IMPERATRIZ CR 500 kV 107 Mvar IMPERATRIZ BC3 MA RB FT CR 500 kV 107 Mvar IMPERATRIZ BC3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 369,087.03
  IMPERATRIZ CR 500 kV 107 Mvar IMPERATRIZ BC3 MA RB FT CR 500 kV 107 Mvar IMPERATRIZ BC3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 286,735.94
  IMPERATRIZ CR 500 kV 107 Mvar IMPERATRIZ BC3 MA RB FT CR 500 kV 107 Mvar IMPERATRIZ BC3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 736,870.63
  IMPERATRIZ CR 500 kV 161 Mvar IMPERATRIZ BC4 MA RB FT CR 500 kV 161 Mvar IMPERATRIZ BC4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 542,548.07
  IMPERATRIZ CR 500 kV 161 Mvar IMPERATRIZ BC4 MA RB FT CR 500 kV 161 Mvar IMPERATRIZ BC4 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 421,494.17
  IMPERATRIZ CR 500 kV 161 Mvar IMPERATRIZ BC4 MA RB FT CR 500 kV 161 Mvar IMPERATRIZ BC4 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,083,180.13
  IMPERATRIZ CR 500 kV 390 Mvar IMPERATRIZ BC1 MA RB FT CR 500 kV 390 Mvar IMPERATRIZ BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,208,236.88
  IMPERATRIZ CR 500 kV 390 Mvar IMPERATRIZ BC1 MA RB FT CR 500 kV 390 Mvar IMPERATRIZ BC1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 938,653.77
  IMPERATRIZ CR 500 kV 390 Mvar IMPERATRIZ BC1 MA RB FT CR 500 kV 390 Mvar IMPERATRIZ BC1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,412,206.86
  IMPERATRIZ CR 500 kV 451 Mvar IMPERATRIZ BC2 MA RB FT CR 500 kV 451 Mvar IMPERATRIZ BC2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,364,562.26
  IMPERATRIZ CR 500 kV 451 Mvar IMPERATRIZ BC2 MA RB FT CR 500 kV 451 Mvar IMPERATRIZ BC2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,060,099.66
  IMPERATRIZ CR 500 kV 451 Mvar IMPERATRIZ BC2 MA RB FT CR 500 kV 451 Mvar IMPERATRIZ BC2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,724,305.55
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,284,622.96
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 997,996.51
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,564,709.27
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RMEL REA 5229/2015 1/9/2018 1/8/2048 222,912.96
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,284,622.96
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 997,996.51
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,564,709.27
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS3 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,284,622.96
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS3 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 997,996.51
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS3 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,564,709.27
  IMPERATRIZ EL 13,8 kV IMPERATRIZ  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  IMPERATRIZ EL 230 kV IMPERATRIZ LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  IMPERATRIZ EL 230 kV IMPERATRIZ LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 173,588.35
  IMPERATRIZ EL 230 kV IMPERATRIZ LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 446,097.39
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,933.57
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,896.56
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 927,452.89
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,950.98
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,950.98
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,896.56
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,948.08
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,896.56
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,064.38
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 150,528.45
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST4 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,064.38
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST4 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 150,528.45
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  IMPERATRIZ EL 69 kV IMPERATRIZ  IMPERATRIZ DIT   058/2001 IPCA RCDM REN 443/2011 27/10/2017 26/10/2048 354,977.11
  IMPERATRIZ EL 69 kV IMPERATRIZ  SANTA RITA DIT   058/2001 IPCA RCDM REA 2040/2009 29/06/2017 28/06/2047 354,735.78
  IMPERATRIZ IB 230 kV MG 500 kV IMPERATRIZ MG2 MA IB1 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG1 MA IB1 RB FT MG 500 kV IMPERATRIZ MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB2 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB3 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB4 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB4 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB4 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 868,670.25
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB5 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB5 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB5 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 868,670.25
  IMPERATRIZ IB 69 kV MG 500 kV IMPERATRIZ MG2 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,564.67
  IMPERATRIZ MC 13,8 kV CS 100/-70 Mvar IMPERATRIZ CS1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 59,739.15
  IMPERATRIZ MC 13,8 kV CS 100/-70 Mvar IMPERATRIZ CS2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 59,739.15
  IMPERATRIZ MC 13,8 kV CS 100/-70 Mvar IMPERATRIZ CS3 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 59,739.15
  IMPERATRIZ MC 230 kV TR 230/13,8 kV IMPERATRIZ TF1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  IMPERATRIZ MC 230 kV TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  IMPERATRIZ MC 230 kV TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 124,464.90
  IMPERATRIZ MC 230 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  IMPERATRIZ MC 230 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 124,464.90
  IMPERATRIZ MC 230 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 319,857.11
  IMPERATRIZ MC 230 kV TR 230/69 kV IMPERATRIZ TF4 MA RBF FT TR 230/69 kV IMPERATRIZ TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  IMPERATRIZ MC 230 kV TR 230/69 kV IMPERATRIZ TF5 MA RBF FT TR 230/69 kV IMPERATRIZ TF5 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  IMPERATRIZ MC 230 kV TR 500/230 kV IMPERATRIZ TR1 MA RB FT TR 500/230 kV IMPERATRIZ TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  IMPERATRIZ MC 230 kV TR 500/230 kV IMPERATRIZ TR2 MA RB FT TR 500/230 kV IMPERATRIZ TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  IMPERATRIZ MC 500 kV RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA RB FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 383,886.18
  IMPERATRIZ MC 500 kV RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA RB FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 298,233.08
  IMPERATRIZ MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 383,886.18
  IMPERATRIZ MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 298,233.08
  IMPERATRIZ MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 766,416.66

 

110 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  IMPERATRIZ MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  IMPERATRIZ MC 500 kV RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  IMPERATRIZ MC 500 kV RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  IMPERATRIZ MC 500 kV RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  IMPERATRIZ MC 500 kV RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  IMPERATRIZ MC 500 kV RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  IMPERATRIZ MC 500 kV TR 500/230 kV IMPERATRIZ TR1 MA RB FT TR 500/230 kV IMPERATRIZ TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,005.44
  IMPERATRIZ MC 500 kV TR 500/230 kV IMPERATRIZ TR2 MA RB FT TR 500/230 kV IMPERATRIZ TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,005.44
  IMPERATRIZ MC 69 kV RTN 69 kV 0 Mvar IMPERATRIZ RN12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,271.34
  IMPERATRIZ MC 69 kV RTN 69 kV 0 Mvar IMPERATRIZ RN2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,271.34
  IMPERATRIZ MC 69 kV RTN 69 kV 0 Mvar IMPERATRIZ RN4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,271.34
  IMPERATRIZ MC 69 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  IMPERATRIZ MC 69 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 48,177.12
  IMPERATRIZ MC 69 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 123,808.35
  IMPERATRIZ MC 69 kV TR 230/69 kV IMPERATRIZ TF4 MA RBF FT TR 230/69 kV IMPERATRIZ TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  IMPERATRIZ MC 69 kV TR 230/69 kV IMPERATRIZ TF5 MA RBF FT TR 230/69 kV IMPERATRIZ TF5 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  IMPERATRIZ MG 500 kV IMPERATRIZ MG2 MA RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,269,300.77
  IMPERATRIZ MG 500 kV IMPERATRIZ MG2 MA RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBNI REN 443/2011 27/10/2017 26/10/2045 48,550.30
  IMPERATRIZ MG 500 kV IMPERATRIZ MG2 MA RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBNI REA 2040/2009 29/06/2017 28/06/2045 48,150.79
  IMPERATRIZ RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA RB FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 741,730.38
  IMPERATRIZ RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA RB FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 576,234.70
  IMPERATRIZ RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA RB FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,480,841.32
  IMPERATRIZ RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 788,678.61
  IMPERATRIZ RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 612,707.80
  IMPERATRIZ RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,574,572.00
  IMPERATRIZ RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2031 14,494.26
  IMPERATRIZ RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 788,678.61
  IMPERATRIZ RTB 500 kV 45,3 Mvar IMPERATRIZ RTR6 MA RB FT RTB 500 kV 45,3 Mvar IMPERATRIZ RTR6 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 247,183.90
  IMPERATRIZ RTB 500 kV 54,4 Mvar IMPERATRIZ RTR14 MA RB FT RTB 500 kV 54,4 Mvar IMPERATRIZ RTR14 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 262,004.78
  IMPERATRIZ RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 667,045.60
  IMPERATRIZ RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 518,213.67
  IMPERATRIZ RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,331,735.52
  IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 741,730.38
  IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 576,234.70
  IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,480,841.32
  IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RMEL REN 443/2011 6/4/2017 6/3/2031 14,634.13
  IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 741,730.38
  IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 576,234.70
  IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,480,841.32
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 765,528.78
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 594,723.18
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,528,354.09
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2031 14,494.26
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RMEL REN 443/2011 9/2/2017 9/1/2031 14,717.20
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 765,528.78
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 594,723.18
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,528,354.09
  IMPERATRIZ RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA RB FT RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,267.53
  IMPERATRIZ RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA RB FT RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 172,674.96
  IMPERATRIZ RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA RB FT RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 443,750.12
  IMPERATRIZ RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA RB FT RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,031.97
  IMPERATRIZ RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA RB FT RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 493,494.88
  IMPERATRIZ RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA RB FT RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 247,183.90
  IMPERATRIZ RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA RB FT RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 247,451.55
  IMPERATRIZ RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA RB FT RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,239.90
  IMPERATRIZ RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA RB FT RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 494,029.23
  IMPERATRIZ RTN 69 kV 0 Mvar IMPERATRIZ RN12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  IMPERATRIZ RTN 69 kV 0 Mvar IMPERATRIZ RN2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  IMPERATRIZ RTN 69 kV 0 Mvar IMPERATRIZ RN4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 626,565.89
  IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 486,765.84
  IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,250,919.07
  IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 626,565.89
  IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 486,765.84
  IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,250,919.07
  IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RMEL REN 443/2011 19/01/2017 18/01/2031 17,362.45
  IMPERATRIZ TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  IMPERATRIZ TR 230/69 kV IMPERATRIZ TF4 MA RBF FT TR 230/69 kV IMPERATRIZ TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  IMPERATRIZ TR 230/69 kV IMPERATRIZ TF4 MA RBF FT TR 230/69 kV IMPERATRIZ TF4 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 271,502.61
  IMPERATRIZ TR 230/69 kV IMPERATRIZ TF4 MA RBF FT TR 230/69 kV IMPERATRIZ TF4 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 697,723.14
  IMPERATRIZ TR 230/69 kV IMPERATRIZ TF5 MA RBF FT TR 230/69 kV IMPERATRIZ TF5 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  IMPERATRIZ TR 500/230 kV IMPERATRIZ TR1 MA RB FT TR 500/230 kV IMPERATRIZ TR1 MA 058/2001 IPCA RMEL REN 443/2011 5/4/2017 5/3/2031 22,179.87
  IMPERATRIZ TR 500/230 kV IMPERATRIZ TR1 MA RB FT TR 500/230 kV IMPERATRIZ TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,847,135.86
  IMPERATRIZ TR 500/230 kV IMPERATRIZ TR1 MA RB FT TR 500/230 kV IMPERATRIZ TR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,435,000.92
  IMPERATRIZ TR 500/230 kV IMPERATRIZ TR2 MA RB FT TR 500/230 kV IMPERATRIZ TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,677,863.55
  IMPERATRIZ TR 500/230 kV IMPERATRIZ TR2 MA RB FT TR 500/230 kV IMPERATRIZ TR2 MA 058/2001 IPCA RMEL REN 443/2011 18/02/2017 17/02/2031 22,118.29
  IMPERATRIZ TR 500/230 kV IMPERATRIZ TRR1 MA RB FT TR 500/230 kV IMPERATRIZ TRR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 615,711.95
  IMPERATRIZ TR 500/230 kV IMPERATRIZ TRR1 MA RB FT TR 500/230 kV IMPERATRIZ TRR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 478,333.64
  IMPERATRIZ TT 69/0 kV IMPERATRIZ TT1 MA DIT   058/2001 IPCA RCDM REN 443/2011 28/11/2019 27/11/2049 243,438.85
  INTEGRADORA EL 230 kV INTEGRADORA LT 230 kV CARAJAS /INTEGRADORA C-2 PA RB FT LT 230 kV CARAJAS /INTEGRADORA C-2 PA 058/2001 IPCA RBNI REA 4658/2014 9/2/2013 31/12/2042 266,159.54
  INTEGRADORA EL 230 kV INTEGRADORA LT 230 kV CARAJAS /INTEGRADORA C-3 PA RB FT LT 230 kV CARAJAS /INTEGRADORA C-3 PA 058/2001 IPCA RBNI REA 4658/2014 9/2/2013 31/12/2042 266,159.54
  INTEGRADORA EL 230 kV INTEGRADORA LT 230 kV INTEGRADORA /ONCA PUMA C-1 PA DIT   058/2001 IPCA RCDM REA 4658/2014 9/2/2013 31/12/2042 266,159.54
  INTEGRADORA EL 230 kV INTEGRADORA LT 230 kV INTEGRADORA /ONCA PUMA C-2 PA DIT   058/2001 IPCA RCDM REA 4658/2014 9/2/2013 31/12/2042 266,159.54
  INTEGRADORA EL 230 kV INTEGRADORA LT 230 kV INTEGRADORA /SERRA DO SOSSEGO C-1 PA DIT   058/2001 IPCA RCDM REA 4658/2014 9/2/2013 31/12/2042 266,159.54
  INTEGRADORA IB 230 kV MG 230 kV INTEGRADORA MG1 PA IB1 RB FT MG 230 kV INTEGRADORA MG1 PA 058/2001 IPCA RBNI REA 4658/2014 9/2/2013 31/12/2042 163,079.08
  INTEGRADORA MG 230 kV INTEGRADORA MG1 PA RB FT MG 230 kV INTEGRADORA MG1 PA 058/2001 IPCA RBNI REA 4658/2014 9/2/2013 31/12/2042 571,422.17
  JARU EL 230 kV JARU LT 230 kV ARIQUEMES /JARU C-1 RO RB FT LT 230 kV ARIQUEMES /JARU C-1 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2044 927,510.53
  JARU EL 230 kV JARU LT 230 kV JARU /JI-PARANA C-1 RO RB FT LT 230 kV JARU /JI-PARANA C-1 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2045 926,508.48
  JARU IB 230 kV MG 230 kV JARU MG1 RO IB1 RB FT MG 230 kV JARU MG1 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2046 664,778.63
  JARU MC 230 kV TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBNI REA 3216/2011 6/11/2018 6/11/2052 98,654.34
  JARU MC 230 kV TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 136,467.78
  JARU MC 230 kV TR 230/69 kV JARU TR2 RO RBF FT TR 230/69 kV JARU TR2 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2045 830,772.26
  JARU MC 230 kV TR 230/69 kV JARU TR3 RO RBF FT TR 230/69 kV JARU TR3 RO 058/2001 IPCA RBNI REA 4225/2013 12/1/2016 30/11/2046 856,022.50
  JARU MC 69 kV TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBNI REA 3216/2011 6/11/2018 6/11/2052 35,319.35
  JARU MC 69 kV TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  JARU MC 69 kV TR 230/69 kV JARU TR2 RO RBF FT TR 230/69 kV JARU TR2 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2045 320,809.91
  JARU MC 69 kV TR 230/69 kV JARU TR3 RO RBF FT TR 230/69 kV JARU TR3 RO 058/2001 IPCA RBNI REA 4225/2013 12/1/2016 30/11/2046 329,621.24
  JARU MG 230 kV JARU MG1 RO RB FT MG 230 kV JARU MG1 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2041 1,905,981.55
  JARU MG 230 kV JARU MG1 RO RB FT MG 230 kV JARU MG1 RO 058/2001 IPCA RBNI REA 4225/2013 12/1/2016 30/11/2045 174,173.63
  JARU MG 230 kV JARU MG1 RO RB FT MG 230 kV JARU MG1 RO 058/2001 IPCA RBNI REA 4225/2013 12/1/2016 30/11/2045 49,021.41
  JARU MG 230 kV JARU MG1 RO RB FT MG 230 kV JARU MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 372,456.45
  JARU TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBNI REA 3216/2011 6/11/2018 6/11/2058 61,217.52
  JARU TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,170.03
  JARU TR 230/69 kV JARU TR2 RO RBF FT TR 230/69 kV JARU TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,170.03
  JARU TR 230/69 kV JARU TR2 RO RBF FT TR 230/69 kV JARU TR2 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2040 128,168.34
  JARU TR 230/69 kV JARU TR3 RO RBF FT TR 230/69 kV JARU TR3 RO 058/2001 IPCA RBNI REA 4225/2013 12/1/2016 30/11/2050 832,472.75
  JARU TR 230/69 kV JARU TR3 RO RBF FT TR 230/69 kV JARU TR3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,170.03
  JAURU EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE C-1 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  JAURU EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE C-1 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBNI REA 5861/2016 6/7/2019 6/6/2034 12,921.37
  JAURU EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE C-2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 5861/2016 6/7/2019 6/6/2034 12,921.37

 

111 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  JAURU EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE C-2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  JAURU EL 230 kV JAURU LT 230 kV VILHENA /JAURU C-3 RO/MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 606,960.69
  JAURU IB 230 kV MG 230 kV JAURU MG1 MT IB1 RB FT MG 230 kV JAURU MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  JAURU MC 138 kV TR 230/138 kV JAURU TR1 MT RBF FT TR 230/138 kV JAURU TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 101,803.73
  JAURU MC 138 kV TR 230/138 kV JAURU TR2 MT RBF FT TR 230/138 kV JAURU TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 101,803.73
  JAURU MC 230 kV RTB 230 kV 100 Mvar JAURU RT1 MT RB FT RTB 230 kV 100 Mvar JAURU RT1 MT 058/2001 IPCA RBNIA REA 8348/2019     804,608.29
  JAURU MC 230 kV RTL 230 kV 0 Mvar JAURU RT7 MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 199,008.64
  JAURU MC 230 kV RTL 230 kV 30 Mvar JAURU RT3 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  JAURU MC 230 kV RTL 230 kV 30 Mvar JAURU RT4 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  JAURU MC 230 kV TR 230/138 kV JAURU TR1 MT RBF FT TR 230/138 kV JAURU TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  JAURU MC 230 kV TR 230/138 kV JAURU TR2 MT RBF FT TR 230/138 kV JAURU TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  JAURU MC 230 kV TR 230/138 kV JAURU TRR1 MT RBF FT TR 230/138 kV JAURU TRR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  JAURU MC 69 kV RTN 69 kV 0 Mvar JAURU RN3 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,271.34
  JAURU MC 69 kV RTN 69 kV 0 Mvar JAURU RN4 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,271.34
  JAURU MG 230 kV JAURU MG1 MT RB FT MG 230 kV JAURU MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 492,353.51
  JAURU MG 230 kV JAURU MG1 MT RB FT MG 230 kV JAURU MG1 MT 058/2001 IPCA RBNIA REA 8348/2019     148,555.66
  JAURU RTB 230 kV 100 Mvar JAURU RT1 MT RB FT RTB 230 kV 100 Mvar JAURU RT1 MT 058/2001 IPCA RBNIA REA 8348/2019     743,171.67
  JAURU RTB 230 kV 33,3 Mvar JAURU RTR MT RB FT RTB 230 kV 33,3 Mvar JAURU RTR MT 058/2001 IPCA RBNIA REA 8348/2019     247,723.89
  JAURU RTL 230 kV 0 Mvar JAURU RT7 MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 652,726.20
  JAURU RTL 230 kV 30 Mvar JAURU RT3 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 228,110.37
  JAURU RTL 230 kV 30 Mvar JAURU RT4 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 228,110.37
  JAURU RTN 69 kV 0 Mvar JAURU RN3 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  JAURU RTN 69 kV 0 Mvar JAURU RN4 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  JAURU TR 230/138 kV JAURU TR1 MT RBF FT TR 230/138 kV JAURU TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 771,154.83
  JAURU TR 230/138 kV JAURU TR2 MT RBF FT TR 230/138 kV JAURU TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 771,154.83
  JAURU TR 230/138 kV JAURU TRR1 MT RBF FT TR 230/138 kV JAURU TRR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 257,051.61
  JI-PARANA BC 230 kV 18,5 Mvar JI-PARANA BC1 RO RB FT BC 230 kV 18,5 Mvar JI-PARANA BC1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,719.76
  JI-PARANA BC 230 kV 18,5 Mvar JI-PARANA BC2 RO RB FT BC 230 kV 18,5 Mvar JI-PARANA BC2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,719.76
  JI-PARANA BC 230 kV 18,5 Mvar JI-PARANA BC3 RO RB FT BC 230 kV 18,5 Mvar JI-PARANA BC3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,719.76
  JI-PARANA EL 138 kV JI-PARANA  ROLIM MOURA C1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 169,270.79
  JI-PARANA EL 230 kV JI-PARANA LT 230 kV ARIQUEMES /JI-PARANA C-3 RO RB FT LT 230 kV ARIQUEMES /JI-PARANA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 601,335.31
  JI-PARANA EL 230 kV JI-PARANA LT 230 kV JARU /JI-PARANA C-1 RO RB FT LT 230 kV JARU /JI-PARANA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  JI-PARANA EL 230 kV JI-PARANA LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  JI-PARANA EL 230 kV JI-PARANA LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 601,335.31
  JI-PARANA EL 69 kV JI-PARANA  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  JI-PARANA EL 69 kV JI-PARANA  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  JI-PARANA IB 138 kV MG 230 kV JI-PARANA MG1 RO IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,705.91
  JI-PARANA IB 230 kV MG 230 kV JI-PARANA MG1 RO IB1 RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBNI REA 2533/2010 25/08/2014 24/08/2042 8,827.54
  JI-PARANA IB 230 kV MG 230 kV JI-PARANA MG1 RO IB1 RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  JI-PARANA IB 69 kV MG 230 kV JI-PARANA MG1 RO IB1 DIT   058/2001 IPCA RCDM REA 2533/2010 11/3/2015 11/2/2046 262,478.33
  JI-PARANA MC 138 kV TR 230/138 kV JI-PARANA TR1 RO RBF FT TR 230/138 kV JI-PARANA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,162.41
  JI-PARANA MC 138 kV TR 230/138 kV JI-PARANA TR2 RO RBF FT TR 230/138 kV JI-PARANA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,162.41
  JI-PARANA MC 230 kV BC 230 kV 18,5 Mvar JI-PARANA BC1 RO RB FT BC 230 kV 18,5 Mvar JI-PARANA BC1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,390.09
  JI-PARANA MC 230 kV BC 230 kV 18,5 Mvar JI-PARANA BC2 RO RB FT BC 230 kV 18,5 Mvar JI-PARANA BC2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,390.09
  JI-PARANA MC 230 kV BC 230 kV 18,5 Mvar JI-PARANA BC3 RO RB FT BC 230 kV 18,5 Mvar JI-PARANA BC3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,390.09
  JI-PARANA MC 230 kV RTB 230 kV 20 Mvar JI-PARANA RT1 RO RB FT RTB 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBNI REA 2533/2010 6/6/2014 6/5/2044 770,783.70
  JI-PARANA MC 230 kV RTL 230 kV 0 Mvar JI-PARANA RT3 RO RB FT RTL 230 kV 20 Mvar JI-PARANA RT3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 197,047.17
  JI-PARANA MC 230 kV RTL 230 kV 20 Mvar JI-PARANA RT1 RO RB FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  JI-PARANA MC 230 kV RTN 230 kV 0,1 Mvar JI-PARANA RN1 RO RB FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,271.34
  JI-PARANA MC 230 kV TR 230/138 kV JI-PARANA TR1 RO RBF FT TR 230/138 kV JI-PARANA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  JI-PARANA MC 230 kV TR 230/138 kV JI-PARANA TR2 RO RBF FT TR 230/138 kV JI-PARANA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  JI-PARANA MC 230 kV TR 230/69 kV JI-PARANA TR1 RO RBF FT TR 230/69 kV JI-PARANA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  JI-PARANA MC 230 kV TR 230/69 kV JI-PARANA TR2 RO RBF FT TR 230/69 kV JI-PARANA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  JI-PARANA MC 230 kV TR 230/69 kV JI-PARANA TR3 RO RBF FT TR 230/69 kV JI-PARANA TR3 RO 058/2001 IPCA RBNI REA 2533/2010 25/08/2014 24/08/2045 800,977.76
  JI-PARANA MC 69 kV TR 230/69 kV JI-PARANA TR1 RO RBF FT TR 230/69 kV JI-PARANA TR1 RO 058/2001 IPCA RBNI REA 2533/2010 6/7/2019 6/7/2053 195,713.86
  JI-PARANA MC 69 kV TR 230/69 kV JI-PARANA TR2 RO RBF FT TR 230/69 kV JI-PARANA TR2 RO 058/2001 IPCA RBNI REA 2533/2010 11/3/2015 11/2/2045 329,205.19
  JI-PARANA MC 69 kV TR 230/69 kV JI-PARANA TR3 RO RBF FT TR 230/69 kV JI-PARANA TR3 RO 058/2001 IPCA RBNI REA 2533/2010 25/08/2014 24/08/2044 319,547.78
  JI-PARANA MG 230 kV JI-PARANA MG1 RO RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBNI REA 2533/2010 13/08/2019 13/08/2051 109,048.22
  JI-PARANA MG 230 kV JI-PARANA MG1 RO RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBNI REA 2533/2010 11/3/2015 11/2/2043 361,570.30
  JI-PARANA MG 230 kV JI-PARANA MG1 RO RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBNI REA 2533/2010 6/6/2014 6/5/2041 164,269.14
  JI-PARANA MG 230 kV JI-PARANA MG1 RO RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBNI REA 7814/2019 13/05/2021 13/05/2053 3,012.26
  JI-PARANA MG 230 kV JI-PARANA MG1 RO RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 592,084.91
  JI-PARANA RTB 230 kV 20 Mvar JI-PARANA RT1 RO RB FT RTB 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBNI REA 2533/2010 6/6/2014 6/5/2049 528,154.84
  JI-PARANA RTL 230 kV 0 Mvar JI-PARANA RT3 RO RB FT RTL 230 kV 20 Mvar JI-PARANA RT3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 593,832.01
  JI-PARANA RTL 230 kV 20 Mvar JI-PARANA RT1 RO RB FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,023.72
  JI-PARANA RTL 230 kV 20,00 Mvar JI-PARANA RLR RO RB FT RTL 230 kV 20 Mvar JI-PARANA RLR RO 058/2001 IPCA RBNI REA 7814/2019 13/05/2021 13/05/2057 424,690.93
  JI-PARANA RTN 230 kV 0,1 Mvar JI-PARANA RN1 RO RB FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  JI-PARANA TR 230/138 kV JI-PARANA TR1 RO RBF FT TR 230/138 kV JI-PARANA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 366,799.00
  JI-PARANA TR 230/138 kV JI-PARANA TR2 RO RBF FT TR 230/138 kV JI-PARANA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 366,799.00
  JI-PARANA TR 230/69 kV JI-PARANA TR1 RO RBF FT TR 230/69 kV JI-PARANA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 272,128.15
  JI-PARANA TR 230/69 kV JI-PARANA TR2 RO RBF FT TR 230/69 kV JI-PARANA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 272,128.15
  JI-PARANA TR 230/69 kV JI-PARANA TR3 RO RBF FT TR 230/69 kV JI-PARANA TR3 RO 058/2001 IPCA RBNI REA 2533/2010 25/08/2014 24/08/2039 1,060,767.98
  JI-PARANA TR 230/69 kV JI-PARANA TR3 RO RBF FT TR 230/69 kV JI-PARANA TR3 RO 058/2001 IPCA RBNI REA 2533/2010 25/08/2014 24/08/2037 1,371.77
  JORGE TEIXEIRA EL 230 kV JORGE TEIXEIRA LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 7/12/2040 691,732.35
  JORGE TEIXEIRA EL 230 kV JORGE TEIXEIRA LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 7/12/2040 691,732.35
  JORGE TEIXEIRA EL 230 kV JORGE TEIXEIRA LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM 014/2012 IPCA RBL CC 014/2012 7/1/2016 5/7/2042 463,539.68
  LECHUGA EL 138 kV LECHUGA  DIST1 DIT   014/2012 IPCA RPEC CC 014/2012 4/1/2015 5/7/2042 345,559.40
  LECHUGA EL 138 kV LECHUGA  DIST2 DIT   014/2012 IPCA RPEC CC 014/2012 4/1/2015 5/7/2042 345,559.40
  LECHUGA EL 138 kV LECHUGA  DIST3 DIT   014/2012 IPCA RPEC CC 014/2012 4/1/2015 5/7/2042 345,559.40
  LECHUGA EL 230 kV LECHUGA LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 7/12/2040 691,732.35
  LECHUGA EL 230 kV LECHUGA LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 7/12/2040 691,732.35
  LECHUGA EL 230 kV LECHUGA LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM 014/2012 IPCA RBL CC 014/2012 7/1/2016 5/7/2042 463,539.68
  LECHUGA IB 138 kV MG 230 kV LECHUGA MG2 AM IB1 DIT   014/2012 IPCA RPEC CC 014/2012 4/1/2015 5/7/2042 198,437.65
  LECHUGA MC 138 kV TR 230/138 kV LECHUGA TR1 AM RBF FT TR 230/138 kV LECHUGA TR1 AM 014/2012 IPCA RBL CC 014/2012 4/1/2015 5/7/2042 245,895.74
  LECHUGA MC 138 kV TR 230/138 kV LECHUGA TR2 AM RBF FT TR 230/138 kV LECHUGA TR2 AM 014/2012 IPCA RBL CC 014/2012 4/1/2015 5/7/2042 245,895.74
  LECHUGA MC 138 kV TR 230/138 kV LECHUGA TR3 AM RBF FT TR 230/138 kV LECHUGA TR3 AM 014/2012 IPCA RBL CC 014/2012 4/1/2015 5/7/2042 245,895.74
  LECHUGA MC 230 kV TR 230/138 kV LECHUGA TR1 AM RBF FT TR 230/138 kV LECHUGA TR1 AM 014/2012 IPCA RBL CC 014/2012 4/1/2015 5/7/2042 329,533.45
  LECHUGA MC 230 kV TR 230/138 kV LECHUGA TR2 AM RBF FT TR 230/138 kV LECHUGA TR2 AM 014/2012 IPCA RBL CC 014/2012 4/1/2015 5/7/2042 329,533.45
  LECHUGA MC 230 kV TR 230/138 kV LECHUGA TR3 AM RBF FT TR 230/138 kV LECHUGA TR3 AM 014/2012 IPCA RBL CC 014/2012 4/1/2015 5/7/2042 329,533.45
  LECHUGA MG 230 kV LECHUGA MG2 AM RB FT MG 230 kV LECHUGA MG2 AM 014/2012 IPCA RBL CC 014/2012 4/1/2015 5/7/2042 711,485.91
  LECHUGA TR 230/138 kV LECHUGA TR1 AM RBF FT TR 230/138 kV LECHUGA TR1 AM 014/2012 IPCA RBL CC 014/2012 4/1/2015 5/7/2042 1,265,765.52
  LECHUGA TR 230/138 kV LECHUGA TR2 AM RBF FT TR 230/138 kV LECHUGA TR2 AM 014/2012 IPCA RBL CC 014/2012 4/1/2015 5/7/2042 1,265,765.52
  LECHUGA TR 230/138 kV LECHUGA TR3 AM RBF FT TR 230/138 kV LECHUGA TR3 AM 014/2012 IPCA RBL CC 014/2012 4/1/2015 5/7/2042 1,265,765.52
  LT 138 kV C. MAGALHAES /RONDONOPOLIS MT LT 138 kV C. MAGALHAES /RONDONOPOLIS C-1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 2,260,279.41
  LT 138 kV RONDONOPOLIS /COXIPO MT LT 138 kV RONDONOPOLIS /COXIPO C-1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 2,387,261.40
  LT 230 kV ABUNA /PORTO VELHO RO LT 230 kV ABUNA /PORTO VELHO C-1 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,394,327.64
  LT 230 kV ABUNA /PORTO VELHO RO LT 230 kV ABUNA /PORTO VELHO C-2 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 13,472,363.37
  LT 230 kV ABUNA /RIO BRANCO 1 RO/AC LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,461,617.61
  LT 230 kV ABUNA /RIO BRANCO 1 RO/AC LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 21,219,724.09
  LT 230 kV ALTAMIRA /TRANSAMAZONIC PA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2044 7,372.40
  LT 230 kV ALTAMIRA /TRANSAMAZONIC PA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,622,253.79
  LT 230 kV ALTAMIRA /TRANSAMAZONIC PA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,738,819.77
  LT 230 kV ALTAMIRA /TRANSAMAZONIC PA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,375,369.96
  LT 230 kV ARIQUEMES /JARU RO LT 230 kV ARIQUEMES /JARU C-1 RO RB FT LT 230 kV ARIQUEMES /JARU C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,452,092.41
  LT 230 kV ARIQUEMES /JI-PARANA RO LT 230 kV ARIQUEMES /JI-PARANA C-3 RO RB FT LT 230 kV ARIQUEMES /JI-PARANA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 11,545,112.30
  LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,815,007.61
  LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,963,799.02
  LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 7,616,542.49
  LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 7,814,435.62
  LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,040,804.49

 

112 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,914,129.20
  LT 230 kV CARAJAS /INTEGRADORA PA LT 230 kV CARAJAS /INTEGRADORA C-2 PA RB FT LT 230 kV CARAJAS /INTEGRADORA C-2 PA 058/2001 IPCA RBNI REA 4658/2014 9/2/2013 31/12/2042 1,834,319.24
  LT 230 kV CARAJAS /INTEGRADORA PA LT 230 kV CARAJAS /INTEGRADORA C-3 PA RB FT LT 230 kV CARAJAS /INTEGRADORA C-3 PA 058/2001 IPCA RBNI REA 4658/2014 9/2/2013 31/12/2042 1,834,319.24
  LT 230 kV CARAJAS /MARABA PA LT 230 kV CARAJAS /MARABA C-1 PA RB FT LT 230 kV CARAJAS /MARABA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,645,047.87
  LT 230 kV CASTANHAL /SANTA MARIA PA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2047 36,229.64
  LT 230 kV CASTANHAL /SANTA MARIA PA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,120,321.13
  LT 230 kV CASTANHAL /SANTA MARIA PA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 435,946.71
  LT 230 kV CASTANHAL /SANTA MARIA PA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 561,151.42
  LT 230 kV COELHO NETO /TERESINA MA/PI LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,329,086.52
  LT 230 kV COLETORA PORTO VELHO /PORTO VELHO RO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 479,531.46
  LT 230 kV COLETORA PORTO VELHO /PORTO VELHO RO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 479,531.46
  LT 230 kV COXIPO /NOBRES MT LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBNI REA 2384/2010 20/12/2012 19/12/2049 57,721.36
  LT 230 kV COXIPO /NOBRES MT LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,029,555.16
  LT 230 kV COXIPO /NOBRES MT LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,576,718.64
  LT 230 kV COXIPO /NOBRES MT LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,051,942.93
  LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-1 PA RB FT LT 230 kV GUAMA /MARITUBA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 204,569.86
  LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-1 PA RB FT LT 230 kV GUAMA /MARITUBA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 408,417.28
  LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-1 PA RB FT LT 230 kV GUAMA /MARITUBA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 158,926.01
  LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-1 PA RB FT LT 230 kV GUAMA /MARITUBA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 204,569.86
  LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-1 PA RB FT LT 230 kV GUAMA /MARITUBA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 408,417.28
  LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-1 PA RB FT LT 230 kV GUAMA /MARITUBA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 158,926.01
  LT 230 kV GUAMA /UTINGA PA LT 230 kV GUAMA /UTINGA C-2 PA RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 231,995.45
  LT 230 kV GUAMA /UTINGA PA LT 230 kV GUAMA /UTINGA C-2 PA RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 596,195.34
  LT 230 kV GUAMA /UTINGA PA LT 230 kV GUAMA /UTINGA C-2 PA RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 298,624.97
  LT 230 kV IMPERATRIZ /PORTO FRANCO MA LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,988,389.91
  LT 230 kV IMPERATRIZ /PORTO FRANCO MA LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,969,757.81
  LT 230 kV IMPERATRIZ /PORTO FRANCO MA LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,544,738.22
  LT 230 kV JARU /JI-PARANA RO LT 230 kV JARU /JI-PARANA C-1 RO RB FT LT 230 kV JARU /JI-PARANA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,509,639.00
  LT 230 kV JAURU /VARZEA GRANDE MT LT 230 kV JAURU /VARZEA GRANDE C-1 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,869,758.87
  LT 230 kV JAURU /VARZEA GRANDE MT LT 230 kV JAURU /VARZEA GRANDE C-2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4530/2014 10/3/2014 10/2/2042 364,250.59
  LT 230 kV JAURU /VARZEA GRANDE MT LT 230 kV JAURU /VARZEA GRANDE C-2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 7/8/2016 7/7/2052 248,664.05
  LT 230 kV JAURU /VARZEA GRANDE MT LT 230 kV JAURU /VARZEA GRANDE C-2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,769,734.05
  LT 230 kV JI-PARANA /PIMENTA BUENO RO LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,126,871.25
  LT 230 kV JI-PARANA /PIMENTA BUENO RO LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 8,326,476.00
  LT 230 kV JORGE TEIXEIRA /LECHUGA AM LT 138 kV JORGE TEIXEIRA /LECHUGA C-0 AM DIT   014/2012 IPCA RCDM REA 5060/2015 29/10/2015 28/10/2043 165,275.66
  LT 230 kV JORGE TEIXEIRA /LECHUGA AM LT 138 kV JORGE TEIXEIRA /LECHUGA C-0 AM DIT   014/2012 IPCA RCDM REA 5060/2015 29/10/2015 28/10/2043 195,733.89
  LT 230 kV JORGE TEIXEIRA /LECHUGA AM LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 7/12/2040 1,916,020.08
  LT 230 kV JORGE TEIXEIRA /LECHUGA AM LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 7/12/2040 1,916,020.08
  LT 230 kV JORGE TEIXEIRA /LECHUGA AM LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM 014/2012 IPCA RBL CC 014/2012 7/1/2016 5/7/2042 1,947,088.25
  LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-1 PA RB FT LT 230 kV MARITUBA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 73,069.43
  LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-1 PA RB FT LT 230 kV MARITUBA /UTINGA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 73,069.43
  LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-1 PA RB FT LT 230 kV MARITUBA /UTINGA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 187,778.06
  LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-1 PA RB FT LT 230 kV MARITUBA /UTINGA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,055.11
  LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-1 PA RB FT LT 230 kV MARITUBA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 187,778.06
  LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-1 PA RB FT LT 230 kV MARITUBA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,055.11
  LT 230 kV MIRANDA II /PERITORO MA LT 230 kV MIRANDA II /PERITORO C-1 MA RB FT LT 230 kV MIRANDA II /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,715,218.75
  LT 230 kV NOBRES /NOVA MUTUM MT LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,888,004.47
  LT 230 kV NOBRES /NOVA MUTUM MT LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,466,750.89
  LT 230 kV NOBRES /NOVA MUTUM MT LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,769,341.45
  LT 230 kV NOVA MUTUM /SORRISO MT LT 230 kV NOVA MUTUM /SORRISO C-1 MT RB FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,617,965.47
  LT 230 kV NOVA MUTUM /SORRISO MT LT 230 kV NOVA MUTUM /SORRISO C-1 MT RB FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,226,685.57
  LT 230 kV NOVA MUTUM /SORRISO MT LT 230 kV NOVA MUTUM /SORRISO C-1 MT RB FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,033,842.21
  LT 230 kV P.DUTRA /PERITORO MA LT 230 kV P.DUTRA /PERITORO C-1 MA RB FT LT 230 kV P.DUTRA /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,904,795.56
  LT 230 kV PERITORO /COELHO NETO MA LT 230 kV PERITORO /COELHO NETO C-1 MA RB FT LT 230 kV PERITORO /COELHO NETO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,026,250.34
  LT 230 kV PIMENTA BUENO /VILHENA RO LT 230 kV PIMENTA BUENO /VILHENA C-1 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,894,205.96
  LT 230 kV PIMENTA BUENO /VILHENA RO LT 230 kV PIMENTA BUENO /VILHENA C-3 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 11,265,230.15
  LT 230 kV RIB.GONCALVES /BALSAS PI/MA LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA RB FT LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 2,202,558.08
  LT 230 kV RONDONOPOLIS /COXIPO MT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,388,911.16
  LT 230 kV RONDONOPOLIS /COXIPO MT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,632,773.67
  LT 230 kV RONDONOPOLIS /COXIPO MT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,632,773.67
  LT 230 kV RONDONOPOLIS /COXIPO MT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,765,854.35
  LT 230 kV RONDONOPOLIS /COXIPO MT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,388,911.16
  LT 230 kV SAMUEL /ARIQUEMES RO LT 230 kV SAMUEL /ARIQUEMES C-1 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,735,864.19
  LT 230 kV SAMUEL /ARIQUEMES RO LT 230 kV SAMUEL /ARIQUEMES C-3 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 10,775,437.45
  LT 230 kV SAMUEL /PORTO VELHO RO LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 584,281.73
  LT 230 kV SAMUEL /PORTO VELHO RO LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 584,281.73
  LT 230 kV SAMUEL /PORTO VELHO RO LT 230 kV SAMUEL /PORTO VELHO C-3 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 2,938,756.24
  LT 230 kV SAO LUIS II /MIRANDA II MA LT 230 kV SAO LUIS II /MIRANDA II C-1 MA RB FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2048 17,109.71
  LT 230 kV SAO LUIS II /MIRANDA II MA LT 230 kV SAO LUIS II /MIRANDA II C-1 MA RB FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,905,337.21
  LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 369,403.95
  LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 286,982.15
  LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 737,503.36
  LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 753,363.64
  LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 293,153.81
  LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 377,348.13
  LT 230 kV SAO LUIS II /SAO LUIS III MA LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 1,532,264.30
  LT 230 kV SINOP /SORRISO MT LT 230 kV SINOP /SORRISO C-1 MT RB FT LT 230 kV SINOP /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 11,852.39
  LT 230 kV SINOP /SORRISO MT LT 230 kV SINOP /SORRISO C-1 MT RB FT LT 230 kV SINOP /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 30,458.96
  LT 230 kV SINOP /SORRISO MT LT 230 kV SINOP /SORRISO C-1 MT RB FT LT 230 kV SINOP /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,256.42
  LT 230 kV TRANSAMAZONIC /RUROPOLIS PA LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,583,119.44
  LT 230 kV TRANSAMAZONIC /RUROPOLIS PA LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,157,116.58
  LT 230 kV TRANSAMAZONIC /RUROPOLIS PA LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,006,771.06
  LT 230 kV TRANSAMAZONIC /RUROPOLIS PA LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2045 6,248.16
  LT 230 kV TUCURUI /ALTAMIRA PA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBNI REA 3216/2011 7/2/2015 7/1/2052 55,077.01
  LT 230 kV TUCURUI /ALTAMIRA PA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,881,033.73
  LT 230 kV TUCURUI /ALTAMIRA PA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 11,741,298.56
  LT 230 kV TUCURUI /ALTAMIRA PA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 4,568,851.18
  LT 230 kV UTINGA /CASTANHAL PA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBNI REA 6029/2016 7/12/2019 7/12/2047 684,114.09
  LT 230 kV UTINGA /CASTANHAL PA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2047 96,612.39
  LT 230 kV UTINGA /CASTANHAL PA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 872,024.22
  LT 230 kV UTINGA /CASTANHAL PA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,240,978.39
  LT 230 kV UTINGA /CASTANHAL PA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,122,471.20
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2052 18,240.76
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 147,224.79
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 114,375.84
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 293,929.66
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 293,929.66
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 114,375.84
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 147,224.79
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2052 18,240.76
  LT 230 kV VARZEA GRANDE /COXIPO MT LT 230 kV VARZEA GRANDE /COXIPO C-1 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,498.40
  LT 230 kV VARZEA GRANDE /COXIPO MT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 427,523.22
  LT 230 kV VARZEA GRANDE /COXIPO MT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT 058/2001 IPCA RBNI REA 4967/2014 21/06/2016 20/06/2052 248,428.03
  LT 230 kV VILA DO CONDE /GUAMA PA LT 230 kV VILA DO CONDE /GUAMA C-1 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 698,715.45
  LT 230 kV VILA DO CONDE /GUAMA PA LT 230 kV VILA DO CONDE /GUAMA C-1 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 542,817.31
  LT 230 kV VILA DO CONDE /GUAMA PA LT 230 kV VILA DO CONDE /GUAMA C-2 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 542,817.31
  LT 230 kV VILA DO CONDE /GUAMA PA LT 230 kV VILA DO CONDE /GUAMA C-2 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 698,715.45
  LT 230 kV VILHENA /JAURU RO/MT LT 230 kV VILHENA /JAURU C-3 RO/MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 23,564,037.28
  LT 230 kV XINGU /RL (TUCURUI / ALTAMIRA) PA LT 230 kV XINGU /RL (TUCURUI / ALTAMIRA) C-1 PA RB FT LT 230 kV XINGU /RL (ALTAMIRA / TUCURUI) C-1 PA 058/2001 IPCA RBNI REA 4472/2014 10/1/2014 31/12/2042 20,080.85
  LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-1 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,018,887.52

 

113 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-1 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,027,113.82
  LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-1 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,345,310.10
  LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-2 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,021,176.72
  LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-2 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,031,684.14
  LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-2 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,347,088.53
  LT 500 kV COLINAS /MIRACEMA TO LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 5,956,745.27
  LT 500 kV COLINAS /MIRACEMA TO LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 15,307,989.23
  LT 500 kV COLINAS /MIRACEMA TO LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,667,533.59
  LT 500 kV IMPERATRIZ /COLINAS MA/TO LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 11,729,631.93
  LT 500 kV IMPERATRIZ /COLINAS MA/TO LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 30,143,487.93
  LT 500 kV IMPERATRIZ /COLINAS MA/TO LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,098,404.02
  LT 500 kV IMPERATRIZ /MARABA MA/PA LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,034,207.22
  LT 500 kV IMPERATRIZ /MARABA MA/PA LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 6,241,606.30
  LT 500 kV IMPERATRIZ /MARABA MA/PA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 6,233,389.15
  LT 500 kV IMPERATRIZ /MARABA MA/PA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 16,018,924.70
  LT 500 kV IMPERATRIZ /MARABA MA/PA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,023,630.10
  LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 16,982,894.97
  LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 33,905,814.75
  LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 13,193,653.25
  LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 13,193,653.25
  LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 33,905,814.75
  LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 16,982,894.97
  LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,783,839.85
  LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 19,533,128.00
  LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 7,600,859.01
  LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 7,600,859.01
  LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 19,533,128.00
  LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,783,839.85
  LT 500 kV MIRANDA II /P.DUTRA MA LT 500 kV MIRANDA II /P.DUTRA C-1 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 6,681,908.31
  LT 500 kV MIRANDA II /P.DUTRA MA LT 500 kV MIRANDA II /P.DUTRA C-1 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 17,171,555.23
  LT 500 kV MIRANDA II /P.DUTRA MA LT 500 kV MIRANDA II /P.DUTRA C-1 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,600,964.79
  LT 500 kV MIRANDA II /P.DUTRA MA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 6,734,634.99
  LT 500 kV MIRANDA II /P.DUTRA MA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 17,307,055.30
  LT 500 kV MIRANDA II /P.DUTRA MA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,668,834.67
  LT 500 kV P.DUTRA /B. ESPERANCA MA/PI LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,024,931.19
  LT 500 kV P.DUTRA /B. ESPERANCA MA/PI LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 18,017,990.77
  LT 500 kV P.DUTRA /B. ESPERANCA MA/PI LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 7,011,278.87
  LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,266,809.84
  LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,255,521.33
  LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,630,639.97
  LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,267,770.45
  LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,257,989.97
  LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,631,876.48
  LT 500 kV TUCURUI /VILA DO CONDE PA LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 14,397,228.83
  LT 500 kV TUCURUI /VILA DO CONDE PA LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 28,743,613.76
  LT 500 kV TUCURUI /VILA DO CONDE PA LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 11,184,903.70
  LT 69 kV TUCURUI /TUCURUI VILA PA LT 69 kV TUCURUI /TUCURUI VILA C-1 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 66,205.23
  LT 69 kV TUCURUI /TUCURUI VILA PA LT 69 kV TUCURUI /TUCURUI VILA C-1 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 25,537.80
  LT 69 kV TUCURUI /TUCURUI VILA PA LT 69 kV TUCURUI /TUCURUI VILA C-1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 32,562.80
  LUCAS RIO VERDE EL 138 kV LUCAS RIO VERDE  DIST1 DIT   004/2011 IPCA RPEC CC 004/2011 28/06/2011 28/06/2041 310,809.01
  LUCAS RIO VERDE EL 138 kV LUCAS RIO VERDE  DIST2 DIT   004/2011 IPCA RPEC CC 004/2011 28/06/2011 28/06/2041 310,809.01
  LUCAS RIO VERDE IB 138 kV MG 230 kV LUCAS RIO VERDE MG2 MT IB1 DIT   004/2011 IPCA RPEC CC 004/2011 28/06/2011 28/06/2041 160,309.70
  LUCAS RIO VERDE IB 230 kV MG 230 kV LUCAS RIO VERDE MG2 MT IB1 RB FT MG 230 kV LUCAS RIO VERDE MG2 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041 228,191.62
  LUCAS RIO VERDE MC 138 kV TR 230/138 kV LUCAS RIO VERDE TR1 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TR1 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041 228,602.29
  LUCAS RIO VERDE MC 230 kV TR 230/138 kV LUCAS RIO VERDE TR1 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TR1 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041 301,794.59
  LUCAS RIO VERDE MG 230 kV LUCAS RIO VERDE MG2 MT RB FT MG 230 kV LUCAS RIO VERDE MG2 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041 653,010.46
  LUCAS RIO VERDE TR 230/138 kV LUCAS RIO VERDE TR1 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TR1 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041 963,752.57
  LUCAS RIO VERDE TR 230/138 kV LUCAS RIO VERDE TRR1 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TRR1 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041 321,251.37
  MARABA CR 500 kV 283 MVAr MARABA BC2 PA RB FT CR 500 kV 283 MVAr MARABA BC2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 912,689.47
  MARABA CR 500 kV 283 MVAr MARABA BC2 PA RB FT CR 500 kV 283 MVAr MARABA BC2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 709,049.22
  MARABA CR 500 kV 283 MVAr MARABA BC2 PA RB FT CR 500 kV 283 MVAr MARABA BC2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,822,155.77
  MARABA CR 500 kV 348 MVAr MARABA BC1 PA RB FT CR 500 kV 348 MVAr MARABA BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,095,468.09
  MARABA CR 500 kV 348 MVAr MARABA BC1 PA RB FT CR 500 kV 348 MVAr MARABA BC1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 851,046.08
  MARABA CR 500 kV 348 MVAr MARABA BC1 PA RB FT CR 500 kV 348 MVAr MARABA BC1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,187,067.54
  MARABA CS 150/-90 MVAr MARABA CS1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,521,128.53
  MARABA CS 150/-90 MVAr MARABA CS1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,181,732.70
  MARABA CS 150/-90 MVAr MARABA CS1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,036,885.18
  MARABA EL 13,8 kV MARABA  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  MARABA EL 230 kV MARABA  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 228,184.49
  MARABA EL 230 kV MARABA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 178,956.68
  MARABA EL 230 kV MARABA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 463,934.56
  MARABA EL 230 kV MARABA  DIST1 DIT   058/2001 IPCA RMEL REA 2837/2011 30/12/2013 29/12/2036 30,815.03
  MARABA EL 230 kV MARABA  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 228,184.49
  MARABA EL 230 kV MARABA  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 178,956.68
  MARABA EL 230 kV MARABA  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 463,934.56
  MARABA EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  MARABA EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RMEL REA 2837/2011 30/12/2013 29/12/2036 32,040.44
  MARABA EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  MARABA EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,896.56
  MARABA EL 500 kV MARABA LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  MARABA EL 500 kV MARABA LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  MARABA EL 500 kV MARABA LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,896.56
  MARABA EL 69 kV MARABA  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  MARABA EL 69 kV MARABA  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  MARABA EL 69 kV MARABA  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  MARABA EL 69 kV MARABA  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,064.38
  MARABA IB 500 kV MG 500 kV MARABA MG1 PA IB7 RB FT MG 500 kV MARABA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  MARABA IB 69 kV MG 500 kV MARABA MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,564.67
  MARABA MC 13,8 kV CS 150/-90 MVAr MARABA CS1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 59,739.15
  MARABA MC 230 kV TR 230/13,8 kV MARABA TF1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  MARABA MC 230 kV TR 230/69 kV MARABA TF3 PA RBF FT TR 230/69 kV MARABA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  MARABA MC 230 kV TR 230/69 kV MARABA TR3 PA RBF FT TR 230/69 kV MARABA TR3 PA 058/2001 IPCA RBNI REA 2533/2010 28/01/2013 27/01/2042 809,369.43
  MARABA MC 230 kV TR 500/230 kV MARABA TR1 PA RB FT TR 500/230 kV MARABA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  MARABA MC 230 kV TR 500/230 kV MARABA TR1 PA RB FT TR 500/230 kV MARABA TR1 PA 058/2001 IPCA RMEL REA 2837/2011 30/12/2013 29/12/2036 32,040.44
  MARABA MC 230 kV TR 500/230 kV MARABA TR2 PA RB FT TR 500/230 kV MARABA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  MARABA MC 500 kV RTB 500 kV 165 Mvar MARABA RT10 PA RB FT RTB 500 kV 165 Mvar MARABA RT10 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 383,886.18
  MARABA MC 500 kV RTB 500 kV 165 Mvar MARABA RT6 PA RB FT RTB 500 kV 165 Mvar MARABA RT6 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 351,205.79
  MARABA MC 500 kV RTB 500 kV 165 Mvar MARABA RT8 PA RB FT RTB 500 kV 165 Mvar MARABA RT8 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 383,886.18
  MARABA MC 500 kV RTL 500 kV 136 MVAr MARABA RT1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  MARABA MC 500 kV RTL 500 kV 136 MVAr MARABA RT2 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  MARABA MC 500 kV RTL 500 kV 136 MVAr MARABA RT2 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RMEL REA 2837/2011 30/12/2013 29/12/2036 32,040.44
  MARABA MC 500 kV RTL 500 kV 136 MVAr MARABA RT3 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  MARABA MC 500 kV RTL 500 kV 136 MVAr MARABA RT4 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  MARABA MC 500 kV TR 500/230 kV MARABA TR1 PA RB FT TR 500/230 kV MARABA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,005.44
  MARABA MC 500 kV TR 500/230 kV MARABA TR2 PA RB FT TR 500/230 kV MARABA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,005.44
  MARABA MC 69 kV TR 230/69 kV MARABA TF3 PA RBF FT TR 230/69 kV MARABA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  MARABA MC 69 kV TR 230/69 kV MARABA TR3 PA RBF FT TR 230/69 kV MARABA TR3 PA 058/2001 IPCA RBNI REA 2533/2010 28/01/2013 27/01/2042 307,316.25
  MARABA MG 500 kV MARABA MG1 PA RB FT MG 500 kV MARABA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,825,132.61
  MARABA RTB 500 kV 165 Mvar MARABA RT10 PA RB FT RTB 500 kV 165 Mvar MARABA RT10 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 351,839.97
  MARABA RTB 500 kV 165 Mvar MARABA RT6 PA RB FT RTB 500 kV 165 Mvar MARABA RT6 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 351,839.97

 

114 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  MARABA RTB 500 kV 165 Mvar MARABA RT8 PA RB FT RTB 500 kV 165 Mvar MARABA RT8 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 351,839.97
  MARABA RTB 500 kV 55 Mvar MARABA RTR1 PA RB FT RTB 500 kV 55 Mvar MARABA RTR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 262,892.87
  MARABA RTB 500 kV 55 Mvar MARABA RTR3 PA RB FT RTB 500 kV 55 Mvar MARABA RTR3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 262,892.87
  MARABA RTL 500 kV 136 MVAr MARABA RT1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 336,190.56
  MARABA RTL 500 kV 136 MVAr MARABA RT1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 261,179.36
  MARABA RTL 500 kV 136 MVAr MARABA RT1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 671,193.85
  MARABA RTL 500 kV 136 MVAr MARABA RT2 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 336,190.56
  MARABA RTL 500 kV 136 MVAr MARABA RT2 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 261,179.36
  MARABA RTL 500 kV 136 MVAr MARABA RT2 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 671,193.85
  MARABA RTL 500 kV 136 MVAr MARABA RT3 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 336,190.56
  MARABA RTL 500 kV 136 MVAr MARABA RT3 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 261,179.36
  MARABA RTL 500 kV 136 MVAr MARABA RT3 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 671,193.85
  MARABA RTL 500 kV 136 MVAr MARABA RT4 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 336,190.56
  MARABA RTL 500 kV 136 MVAr MARABA RT4 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 261,179.36
  MARABA RTL 500 kV 136 MVAr MARABA RT4 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 671,193.85
  MARABA RTL 500 kV 45,45 Mvar MARABA RTR1 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 247,451.55
  MARABA RTL 500 kV 45,45 Mvar MARABA RTR1 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,239.90
  MARABA RTL 500 kV 45,45 Mvar MARABA RTR1 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 494,029.23
  MARABA RTL 500 kV 45,45 Mvar MARABA RTR2 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 247,451.55
  MARABA RTL 500 kV 45,45 Mvar MARABA RTR2 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,239.90
  MARABA RTL 500 kV 45,45 Mvar MARABA RTR2 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 494,029.23
  MARABA TR 230/13,8 kV MARABA TF1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 420,647.81
  MARABA TR 230/13,8 kV MARABA TF1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 326,792.42
  MARABA TR 230/13,8 kV MARABA TF1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RMEL REN 443/2011 16/12/2016 15/12/2030 28,905.42
  MARABA TR 230/13,8 kV MARABA TRR1 PA RB FT TR 230/13,8 kV MARABA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 420,647.81
  MARABA TR 230/69 kV MARABA TF2 PA RBF FT TR 230/69 kV MARABA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 181,602.14
  MARABA TR 230/69 kV MARABA TF2 PA RBF FT TR 230/69 kV MARABA TF2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 141,082.88
  MARABA TR 230/69 kV MARABA TF3 PA RBF FT TR 230/69 kV MARABA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 181,602.14
  MARABA TR 230/69 kV MARABA TF3 PA RBF FT TR 230/69 kV MARABA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 141,082.88
  MARABA TR 230/69 kV MARABA TR3 PA RBF FT TR 230/69 kV MARABA TR3 PA 058/2001 IPCA RBNI REA 2533/2010 28/01/2013 27/01/2047 792,709.51
  MARABA TR 500/230 kV MARABA TR1 PA RB FT TR 500/230 kV MARABA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,439,287.63
  MARABA TR 500/230 kV MARABA TR1 PA RB FT TR 500/230 kV MARABA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,118,152.23
  MARABA TR 500/230 kV MARABA TR2 PA RB FT TR 500/230 kV MARABA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,677,863.55
  MARABA TR 500/230 kV MARABA TRR1 PA RB FT TR 500/230 kV MARABA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 479,762.54
  MARABA TR 500/230 kV MARABA TRR1 PA RB FT TR 500/230 kV MARABA TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 372,717.41
  MARABA TR 500/230 kV MARABA TRR2 PA RB FT TR 500/230 kV MARABA TRR2 PA 058/2001 IPCA RMEL REN 443/2011 7/3/2016 7/2/2030 42,663.05
  MARABA TR 500/230 kV MARABA TRR2 PA RB FT TR 500/230 kV MARABA TRR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 559,287.85
  MIRACEMA CR 500 kV 161 MVAr MIRACEMA BC1 TO RB FT CR 500 kV 161 MVAr MIRACEMA BC1 TO 058/2001 IPCA RBNI REA 6502/2017 14/10/2019 14/10/2039 12,373,596.64
  MIRACEMA CR 500 kV 161 MVAr MIRACEMA BC1 TO RB FT CR 500 kV 161 MVAr MIRACEMA BC1 TO 058/2001 IPCA RBNI REA 6502/2017 28/11/2019 28/11/2039 62,374.54
  MIRACEMA EL 500 kV MIRACEMA LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  MIRACEMA EL 500 kV MIRACEMA LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,896.56
  MIRACEMA EL 500 kV MIRACEMA LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 927,452.89
  MIRACEMA EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  MIRACEMA EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,896.56
  MIRACEMA EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 927,452.89
  MIRACEMA EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBNI REA 6502/2017 17/05/2019 17/05/2047 170,233.62
  MIRACEMA IB 500 kV MG 500 kV MIRACEMA MG1 TO IB1 RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  MIRACEMA IB 500 kV MG 500 kV MIRACEMA MG1 TO IB1 RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  MIRACEMA IB 500 kV MG 500 kV MIRACEMA MG1 TO IB1 RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 868,670.25
  MIRACEMA IB 500 kV MG 500 kV MIRACEMA MG1 TO IB5 RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBNI REA 2911/2011 10/8/2013 10/7/2044 1,264,970.64
  MIRACEMA MC 138 kV TR 500/138 kV MIRACEMA TF1 TO RBF FT TR 500/138 kV MIRACEMA TF1 TO 058/2001 IPCA RBNI REA 2911/2011 27/11/2013 26/11/2041 55,531.62
  MIRACEMA MC 138 kV TR 500/138 kV MIRACEMA TF1 TO RBF FT TR 500/138 kV MIRACEMA TF1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,162.41
  MIRACEMA MC 138 kV TR 500/138 kV MIRACEMA TR2 TO RBF FT TR 500/138 kV MIRACEMA TR2 TO 058/2001 IPCA RBNI REA 2911/2011 10/8/2013 10/7/2043 660,524.62
  MIRACEMA MC 500 kV CR 500 kV 161 MVAr MIRACEMA BC1 TO RB FT CR 500 kV 161 MVAr MIRACEMA BC1 TO 058/2001 IPCA RBNI REA 6502/2017 14/10/2019 14/10/2051 318,326.59
  MIRACEMA MC 500 kV RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 351,205.79
  MIRACEMA MC 500 kV RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 272,844.38
  MIRACEMA MC 500 kV RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 701,171.29
  MIRACEMA MC 500 kV RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBNI REA 6502/2017 7/9/2019 7/9/2047 186,314.72
  MIRACEMA MC 500 kV TR 500/138 kV MIRACEMA TF1 TO RBF FT TR 500/138 kV MIRACEMA TF1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,005.44
  MIRACEMA MC 500 kV TR 500/138 kV MIRACEMA TR2 TO RBF FT TR 500/138 kV MIRACEMA TR2 TO 058/2001 IPCA RBNI REA 2911/2011 10/8/2013 10/7/2044 1,351,963.94
  MIRACEMA MC 69 kV RTN 69 kV 0 Mvar MIRACEMA RN1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,271.34
  MIRACEMA MC 69 kV RTN 69 kV 0 Mvar MIRACEMA RN2 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,271.34
  MIRACEMA MG 500 kV MIRACEMA MG1 TO RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 493,294.94
  MIRACEMA MG 500 kV MIRACEMA MG1 TO RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 383,230.44
  MIRACEMA MG 500 kV MIRACEMA MG1 TO RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 984,847.80
  MIRACEMA MG 500 kV MIRACEMA MG1 TO RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBNI REA 6502/2017 18/10/2019 18/10/2050 18,401.43
  MIRACEMA MG 500 kV MIRACEMA MG1 TO RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBNI REA 2911/2011 10/8/2013 10/7/2040 722,110.33
  MIRACEMA RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 741,730.38
  MIRACEMA RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 576,234.70
  MIRACEMA RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,480,841.32
  MIRACEMA RTL 500 kV 136 MVAr MIRACEMA RT1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 741,730.38
  MIRACEMA RTL 500 kV 136 MVAr MIRACEMA RT1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 576,234.70
  MIRACEMA RTL 500 kV 136 MVAr MIRACEMA RT1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,480,841.32
  MIRACEMA RTL 500 kV 136 Mvar MIRACEMA RT2 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 741,730.38
  MIRACEMA RTL 500 kV 136 Mvar MIRACEMA RT2 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 576,234.70
  MIRACEMA RTL 500 kV 136 Mvar MIRACEMA RT2 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,480,841.32
  MIRACEMA RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO RB FT RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 247,451.55
  MIRACEMA RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO RB FT RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,239.90
  MIRACEMA RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO RB FT RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 494,029.23
  MIRACEMA RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO RB FT RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 247,540.57
  MIRACEMA RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO RB FT RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,309.05
  MIRACEMA RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO RB FT RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 494,206.95
  MIRACEMA RTN 69 kV 0 Mvar MIRACEMA RN1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  MIRACEMA RTN 69 kV 0 Mvar MIRACEMA RN2 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  MIRACEMA TR 500/138 kV MIRACEMA TF1 TO RBF FT TR 500/138 kV MIRACEMA TF1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,085,417.94
  MIRACEMA TR 500/138 kV MIRACEMA TR2 TO RBF FT TR 500/138 kV MIRACEMA TR2 TO 058/2001 IPCA RBNI REA 2911/2011 10/8/2013 10/7/2047 3,133,898.76
  MIRACEMA TR 500/138 kV MIRACEMA TRR1 TO RBF FT TR 500/138 kV MIRACEMA TRR1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 361,805.98
  MIRAMAR EL 230 kV MIRAMAR LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2046 911,505.61
  MIRAMAR EL 230 kV MIRAMAR LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2046 912,575.19
  MIRAMAR EL 69 kV MIRAMAR  DIST1 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 12/9/2041 210,999.17
  MIRAMAR EL 69 kV MIRAMAR  DIST2 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 12/9/2041 246,832.52
  MIRAMAR EL 69 kV MIRAMAR  DIST3 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 12/9/2041 246,832.52
  MIRAMAR EL 69 kV MIRAMAR  DIST4 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 12/9/2041 246,832.52
  MIRAMAR EL 69 kV MIRAMAR  DIST5 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 12/9/2041 246,832.52
  MIRAMAR EL 69 kV MIRAMAR  DIST6 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 12/9/2041 246,832.52
  MIRAMAR EL 69 kV MIRAMAR  DIST7 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 12/9/2041 246,832.52
  MIRAMAR IB 230 kV MG 230 kV MIRAMAR MG1 PA IB1 RB FT MG 230 kV MIRAMAR MG1 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 12/9/2041 111,634.98
  MIRAMAR IB 69 kV MG 230 kV MIRAMAR MG1 PA IB1 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 12/9/2041 144,897.29
  MIRAMAR MC 230 kV TR 230/69 kV MIRAMAR TR1 PA RBF FT TR 230/69 kV MIRAMAR TR1 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 12/9/2041 147,337.12
  MIRAMAR MC 230 kV TR 230/69 kV MIRAMAR TR2 PA RBF FT TR 230/69 kV MIRAMAR TR2 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 12/9/2041 147,337.12
  MIRAMAR MC 230 kV TR 230/69 kV MIRAMAR TR3 PA RBF FT TR 230/69 kV MIRAMAR TR3 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 12/9/2041 230,314.52
  MIRAMAR MC 69 kV TR 230/69 kV MIRAMAR TR1 PA RBF FT TR 230/69 kV MIRAMAR TR1 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 12/9/2041 59,924.50
  MIRAMAR MC 69 kV TR 230/69 kV MIRAMAR TR2 PA RBF FT TR 230/69 kV MIRAMAR TR2 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 12/9/2041 59,924.50
  MIRAMAR MC 69 kV TR 230/69 kV MIRAMAR TR3 PA RBF FT TR 230/69 kV MIRAMAR TR3 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 12/9/2041 93,672.81
  MIRAMAR MG 230 kV MIRAMAR MG1 PA RB FT MG 230 kV MIRAMAR MG1 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 12/9/2041 310,971.49
  MIRAMAR MG 230 kV MIRAMAR MG2 PA RB FT MG 230 kV MIRAMAR MG2 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2047 455,700.99
  MIRAMAR TR 230/69 kV MIRAMAR TR1 PA RBF FT TR 230/69 kV MIRAMAR TR1 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 12/9/2041 420,139.89
  MIRAMAR TR 230/69 kV MIRAMAR TR2 PA RBF FT TR 230/69 kV MIRAMAR TR2 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 12/9/2041 420,139.89
  MIRAMAR TR 230/69 kV MIRAMAR TR3 PA RBF FT TR 230/69 kV MIRAMAR TR3 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 12/9/2041 656,754.49
  MIRANDA II BC 230 kV 20 Mvar MIRANDA II BC1 MA RB FT BC 230 kV 20 Mvar MIRANDA II BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 114,995.18

 

115 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  MIRANDA II BC 230 kV 20 Mvar MIRANDA II BC2 MA RB FT BC 230 kV 20 Mvar MIRANDA II BC2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 114,995.18
  MIRANDA II EL 13,8 kV MIRANDA II  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  MIRANDA II EL 13,8 kV MIRANDA II  DIST5 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,575.58
  MIRANDA II EL 13,8 kV MIRANDA II  DIST5 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 102,597.34
  MIRANDA II EL 13,8 kV MIRANDA II  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  MIRANDA II EL 13,8 kV MIRANDA II  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,575.58
  MIRANDA II EL 13,8 kV MIRANDA II  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 102,597.34
  MIRANDA II EL 138 kV MIRANDA II  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 169,270.79
  MIRANDA II EL 138 kV MIRANDA II  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 132,752.83
  MIRANDA II EL 138 kV MIRANDA II  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 344,153.83
  MIRANDA II EL 138 kV MIRANDA II  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 169,270.79
  MIRANDA II EL 138 kV MIRANDA II  DIST4 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 132,752.83
  MIRANDA II EL 138 kV MIRANDA II  DIST4 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 344,153.83
  MIRANDA II EL 138 kV MIRANDA II  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 169,270.79
  MIRANDA II EL 138 kV MIRANDA II  SANTA INES C2 DIT   058/2001 IPCA RCDM REN 443/2011 27/10/2017 26/10/2045 620,474.98
  MIRANDA II EL 138 kV MIRANDA II  TRES MARIAS DIT   058/2001 IPCA RCDM REN 443/2011 29/06/2017 28/06/2048 690,223.07
  MIRANDA II EL 230 kV MIRANDA II LT 230 kV MIRANDA II /PERITORO C-1 MA RB FT LT 230 kV MIRANDA II /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  MIRANDA II EL 230 kV MIRANDA II LT 230 kV MIRANDA II /PERITORO C-1 MA RB FT LT 230 kV MIRANDA II /PERITORO C-1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 310,684.44
  MIRANDA II EL 230 kV MIRANDA II LT 230 kV SAO LUIS II /MIRANDA II C-1 MA RB FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 310,689.16
  MIRANDA II EL 230 kV MIRANDA II LT 230 kV SAO LUIS II /MIRANDA II C-1 MA RB FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  MIRANDA II EL 69 kV MIRANDA II  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  MIRANDA II EL 69 kV MIRANDA II  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,064.38
  MIRANDA II EL 69 kV MIRANDA II  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 150,528.45
  MIRANDA II EL 69 kV MIRANDA II  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  MIRANDA II EL 69 kV MIRANDA II  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,064.38
  MIRANDA II EL 69 kV MIRANDA II  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 150,528.45
  MIRANDA II EL 69 kV MIRANDA II  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  MIRANDA II EL 69 kV MIRANDA II  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,064.38
  MIRANDA II EL 69 kV MIRANDA II  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 150,528.45
  MIRANDA II EL 69 kV MIRANDA II  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  MIRANDA II IB 138 kV MG 230 kV MIRANDA II MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,705.91
  MIRANDA II IB 230 kV MG 230 kV MIRANDA II MG1 MA IB1 RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2044 229,916.05
  MIRANDA II IB 230 kV MG 230 kV MIRANDA II MG1 MA IB1 RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  MIRANDA II IB 230 kV MG 230 kV MIRANDA II MG1 MA IB1 RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 102,269.43
  MIRANDA II IB 230 kV MG 230 kV MIRANDA II MG1 MA IB1 RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 262,817.90
  MIRANDA II IB 500 kV MG 500 kV MIRANDA II MG1 MA IB1 RB FT MG 500 kV MIRANDA II MG1 MA 002/2009 IPCA RBL CC 002/2009 12/8/2010 28/01/2039 356,884.84
  MIRANDA II IB 500 kV MG 500 kV MIRANDA II MG1 MA IB2 RB FT MG 500 kV MIRANDA II MG1 MA 002/2009 IPCA RBL CC 002/2009 12/8/2010 28/01/2039 356,884.84
  MIRANDA II IB 500 kV MG 500 kV MIRANDA II MG1 MA IB3 RB FT MG 500 kV MIRANDA II MG1 MA 002/2009 IPCA RBL CC 002/2009 12/8/2010 28/01/2039 356,884.84
  MIRANDA II IB 69 kV MG 230 kV MIRANDA II MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,564.67
  MIRANDA II IB 69 kV MG 230 kV MIRANDA II MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 33,381.90
  MIRANDA II IB 69 kV MG 230 kV MIRANDA II MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 86,540.59
  MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 90,505.50
  MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,162.41
  MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 86,359.74
  MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 221,932.26
  MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR2 MA RBF FT TR 230/138 kV MIRANDA II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,162.41
  MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR2 MA RBF FT TR 230/138 kV MIRANDA II TR2 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 90,505.50
  MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR3 MA RBF FT TR 230/138 kV MIRANDA II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,162.41
  MIRANDA II MC 230 kV BC 230 kV 20 Mvar MIRANDA II BC1 MA RB FT BC 230 kV 20 Mvar MIRANDA II BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 158,595.50
  MIRANDA II MC 230 kV BC 230 kV 20 Mvar MIRANDA II BC1 MA RB FT BC 230 kV 20 Mvar MIRANDA II BC1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2045 252,148.82
  MIRANDA II MC 230 kV BC 230 kV 20 Mvar MIRANDA II BC2 MA RB FT BC 230 kV 20 Mvar MIRANDA II BC2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 158,595.50
  MIRANDA II MC 230 kV RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 302,671.15
  MIRANDA II MC 230 kV RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,044.80
  MIRANDA II MC 230 kV RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,044.80
  MIRANDA II MC 230 kV RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2044 302,443.43
  MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 176,788.89
  MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR2 MA RBF FT TR 230/138 kV MIRANDA II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR2 MA RBF FT TR 230/138 kV MIRANDA II TR2 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 176,414.50
  MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR3 MA RBF FT TR 230/138 kV MIRANDA II TR3 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2046 130,762.71
  MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR3 MA RBF FT TR 230/138 kV MIRANDA II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 118,106.27
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 303,516.33
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 176,504.07
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 176,452.13
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 118,106.27
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 303,516.33
  MIRANDA II MC 230 kV TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RBNI REA 6219/2017 4/1/2019 4/1/2043 52,601.94
  MIRANDA II MC 230 kV TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RBL CC 002/2009 12/8/2010 28/01/2039 388,158.38
  MIRANDA II MC 230 kV TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RBNI REA 2533/2010 16/11/2015 16/11/2049 132,672.58
  MIRANDA II MC 230 kV TR 500/230 kV MIRANDA II TR2 MA RB FT TR 500/230 kV MIRANDA II TR2 MA 002/2009 IPCA RBNI REA 6219/2017 3/10/2019 3/10/2045 847,190.63
  MIRANDA II MC 500 kV RTB 500 kV 136 Mvar MIRANDA II RT1 MA RB FT RTB 500 kV 136 Mvar MIRANDA II RT1 MA 002/2009 IPCA RBL CC 002/2009 12/8/2010 28/01/2039 822,480.39
  MIRANDA II MC 500 kV TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RBL CC 002/2009 12/8/2010 28/01/2039 926,247.87
  MIRANDA II MC 500 kV TR 500/230 kV MIRANDA II TR2 MA RB FT TR 500/230 kV MIRANDA II TR2 MA 002/2009 IPCA RBNI REA 6219/2017 3/10/2019 11/10/2038 1,302,761.83
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 48,177.12
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 123,808.35
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 69,519.64
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 69,519.64
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 48,177.12
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 123,808.35
  MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 669,401.42
  MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 520,043.86
  MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,336,438.85
  MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2045 194,617.19
  MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBNI REN 443/2011 29/06/2017 28/06/2045 107,701.68
  MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBNI REN 443/2011 27/10/2017 26/10/2048 83,058.55
  MIRANDA II MG 500 kV MIRANDA II MG1 MA RB FT MG 500 kV MIRANDA II MG1 MA 002/2009 IPCA RBL CC 002/2009 12/8/2010 28/01/2039 3,250,651.98
  MIRANDA II MG 500 kV MIRANDA II MG1 MA RB FT MG 500 kV MIRANDA II MG1 MA 002/2009 IPCA RBNI REA 6219/2017 3/10/2019 3/10/2051 92,462.18
  MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 379,214.05
  MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 189,942.42
  MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 147,562.26
  MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RMEL REN 443/2011 4/6/2017 4/5/2047 216.24
  MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 189,942.42
  MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 147,562.26
  MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 379,214.05
  MIRANDA II RTB 500 kV 136 Mvar MIRANDA II RT1 MA RB FT RTB 500 kV 136 Mvar MIRANDA II RT1 MA 002/2009 IPCA RBL CC 002/2009 12/8/2010 28/01/2039 1,207,839.14
  MIRANDA II RTB 500 kV 45,33 Mvar MIRANDA II RTR1 MA RB FT RTB 500 kV 45,33 Mvar MIRANDA II RTR1 MA 002/2009 IPCA RBL CC 002/2009 12/8/2010 28/01/2039 402,614.01
  MIRANDA II TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 366,799.00
  MIRANDA II TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 284,958.42
  MIRANDA II TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 732,302.65
  MIRANDA II TR 230/138 kV MIRANDA II TR2 MA RBF FT TR 230/138 kV MIRANDA II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 366,799.00
  MIRANDA II TR 230/138 kV MIRANDA II TR3 MA RBF FT TR 230/138 kV MIRANDA II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 366,799.00
  MIRANDA II TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  MIRANDA II TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 271,502.61
  MIRANDA II TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 697,723.14
  MIRANDA II TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RMEL REN 443/2011 19/03/2017 18/03/2031 44,290.05

 

116 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  MIRANDA II TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RMEL REN 443/2011 29/10/2017 28/10/2040 17,587.53
  MIRANDA II TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2040 15,732.75
  MIRANDA II TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  MIRANDA II TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 271,502.61
  MIRANDA II TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 697,723.14
  MIRANDA II TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RBL CC 002/2009 12/8/2010 28/01/2039 2,544,092.84
  MIRANDA II TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RMEL REN 443/2011 19/09/2017 18/09/2047 35,978.53
  MIRANDA II TR 500/230 kV MIRANDA II TR2 MA RB FT TR 500/230 kV MIRANDA II TR2 MA 002/2009 IPCA RBNI REA 6219/2017 3/10/2019 3/10/2054 4,990,829.71
  MIRANDA II TR 500/230 kV MIRANDA II TRR1 MA RB FT TR 500/230 kV MIRANDA II TRR1 MA 002/2009 IPCA RBL CC 002/2009 12/8/2010 28/01/2039 848,030.95
  NOBRES EL 138 kV NOBRES  DIST1 DIT   013/2011 IPCA RPEC CC 013/2011 12/9/2011 12/9/2041 209,878.47
  NOBRES EL 230 kV NOBRES LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBNI REA 2384/2010 20/12/2012 19/12/2038 86,103.73
  NOBRES EL 230 kV NOBRES LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBNI REA 2376/2010 5/9/2014 5/8/2038 35,311.19
  NOBRES EL 230 kV NOBRES LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  NOBRES EL 230 kV NOBRES LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  NOBRES EL 230 kV NOBRES LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 167,801.30
  NOBRES EL 230 kV NOBRES LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 431,225.49
  NOBRES IB 138 kV MG 230 kV NOBRES MG2 MT IB1 DIT   013/2011 IPCA RPEC CC 013/2011 12/9/2011 12/9/2041 108,504.38
  NOBRES IB 230 kV MG 230 kV NOBRES MG1 MT IB1 RB FT MG 230 kV NOBRES MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  NOBRES MC 138 kV TR 230/138 kV NOBRES TR1 MT RBF FT TR 230/138 kV NOBRES TR1 MT 013/2011 IPCA RBL CC 013/2011 10/8/2013 12/9/2041 135,611.42
  NOBRES MC 138 kV TR 230/138 kV NOBRES TR2 MT RBF FT TR 230/138 kV NOBRES TR2 MT 013/2011 IPCA RBL CC 013/2011 10/8/2013 12/9/2041 135,611.42
  NOBRES MC 230 kV TR 230/138 kV NOBRES TR1 MT RBF FT TR 230/138 kV NOBRES TR1 MT 013/2011 IPCA RBL CC 013/2011 10/8/2013 12/9/2041 176,465.46
  NOBRES MC 230 kV TR 230/138 kV NOBRES TR2 MT RBF FT TR 230/138 kV NOBRES TR2 MT 013/2011 IPCA RBL CC 013/2011 10/8/2013 12/9/2041 176,465.46
  NOBRES MG 230 kV NOBRES MG1 MT RB FT MG 230 kV NOBRES MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 376,222.15
  NOBRES MG 230 kV NOBRES MG2 MT RB FT MG 230 kV NOBRES MG2 MT 013/2011 IPCA RBL CC 013/2011 10/8/2013 12/9/2041 382,638.03
  NOBRES TR 230/138 kV NOBRES TR1 MT RBF FT TR 230/138 kV NOBRES TR1 MT 013/2011 IPCA RBL CC 013/2011 10/8/2013 12/9/2041 433,772.34
  NOBRES TR 230/138 kV NOBRES TR2 MT RBF FT TR 230/138 kV NOBRES TR2 MT 013/2011 IPCA RBL CC 013/2011 10/8/2013 12/9/2041 433,772.34
  NOVA MUTUM EL 13,8 kV NOVA MUTUM  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  NOVA MUTUM EL 230 kV NOVA MUTUM LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  NOVA MUTUM EL 230 kV NOVA MUTUM LT 230 kV NOVA MUTUM /SORRISO C-1 MT RB FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  NOVA MUTUM IB 230 kV MG 230 kV NOVA MUTUM MG1 MT IB1 RB FT MG 230 kV NOVA MUTUM MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  NOVA MUTUM MC 230 kV RTL 230 kV 20 MVAr NOVA MUTUM RT1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  NOVA MUTUM MC 230 kV TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  NOVA MUTUM MC 230 kV TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 118,106.27
  NOVA MUTUM MC 230 kV TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 303,516.33
  NOVA MUTUM MC 230 kV TR 230/69 kV NOVA MUTUM TF2 MT RBF FT TR 230/69 kV NOVA MUTUM TF2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  NOVA MUTUM MC 230 kV TR 230/69 kV NOVA MUTUM TF3 MT RBF FT TR 230/69 kV NOVA MUTUM TF3 MT 058/2001 IPCA RBNI REA 4347/2013 20/01/2017 19/01/2047 878,423.15
  NOVA MUTUM MC 69 kV TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  NOVA MUTUM MC 69 kV TR 230/69 kV NOVA MUTUM TF2 MT RBF FT TR 230/69 kV NOVA MUTUM TF2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  NOVA MUTUM MC 69 kV TR 230/69 kV NOVA MUTUM TF3 MT RBF FT TR 230/69 kV NOVA MUTUM TF3 MT 058/2001 IPCA RBNI REA 4347/2013 20/01/2017 19/01/2046 323,487.29
  NOVA MUTUM MG 230 kV NOVA MUTUM MG1 MT RB FT MG 230 kV NOVA MUTUM MG1 MT 058/2001 IPCA RBNI REA 4347/2013 20/01/2017 19/01/2046 227,442.31
  NOVA MUTUM MG 230 kV NOVA MUTUM MG1 MT RB FT MG 230 kV NOVA MUTUM MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 454,552.96
  NOVA MUTUM MG 230 kV NOVA MUTUM MG1 MT RB FT MG 230 kV NOVA MUTUM MG1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 353,132.62
  NOVA MUTUM MG 230 kV NOVA MUTUM MG1 MT RB FT MG 230 kV NOVA MUTUM MG1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 907,500.67
  NOVA MUTUM RTL 230 kV 20 MVAr NOVA MUTUM RT1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,506.77
  NOVA MUTUM RTL 230 kV 20 MVAr NOVA MUTUM RT1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 221,804.19
  NOVA MUTUM RTL 230 kV 20 MVAr NOVA MUTUM RT1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 570,005.26
  NOVA MUTUM TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,170.03
  NOVA MUTUM TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 129,870.88
  NOVA MUTUM TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 333,749.70
  NOVA MUTUM TR 230/69 kV NOVA MUTUM TF2 MT RBF FT TR 230/69 kV NOVA MUTUM TF2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,170.03
  NOVA MUTUM TR 230/69 kV NOVA MUTUM TF3 MT RBF FT TR 230/69 kV NOVA MUTUM TF3 MT 058/2001 IPCA RBNI REA 4347/2013 20/01/2017 19/01/2051 118,381.63
  P.DUTRA CR 500 kV 390 MVAr P.DUTRA BC1 MA RB FT CR 500 kV 390 MVAr P.DUTRA BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,208,236.88
  P.DUTRA CR 500 kV 390 MVAr P.DUTRA BC1 MA RB FT CR 500 kV 390 MVAr P.DUTRA BC1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 938,653.77
  P.DUTRA CR 500 kV 390 MVAr P.DUTRA BC1 MA RB FT CR 500 kV 390 MVAr P.DUTRA BC1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,412,206.86
  P.DUTRA CR 500 kV 454 MVAr P.DUTRA BC2 MA RB FT CR 500 kV 454 MVAr P.DUTRA BC2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,364,562.26
  P.DUTRA CR 500 kV 454 MVAr P.DUTRA BC2 MA RB FT CR 500 kV 454 MVAr P.DUTRA BC2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,060,099.66
  P.DUTRA CR 500 kV 454 MVAr P.DUTRA BC2 MA RB FT CR 500 kV 454 MVAr P.DUTRA BC2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,724,305.55
  P.DUTRA CS 100/-70 MVAr P.DUTRA CS1 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,284,622.96
  P.DUTRA CS 100/-70 MVAr P.DUTRA CS1 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 997,996.51
  P.DUTRA CS 100/-70 MVAr P.DUTRA CS1 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,564,709.27
  P.DUTRA CS 100/-70 MVAr P.DUTRA CS2 MA RB FT CS 100/-70 MVAr P.DUTRA CS2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,284,622.96
  P.DUTRA CS 100/-70 MVAr P.DUTRA CS2 MA RB FT CS 100/-70 MVAr P.DUTRA CS2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 997,996.51
  P.DUTRA CS 100/-70 MVAr P.DUTRA CS2 MA RB FT CS 100/-70 MVAr P.DUTRA CS2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,564,709.27
  P.DUTRA EL 13,8 kV P.DUTRA  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  P.DUTRA EL 230 kV P.DUTRA LT 230 kV P.DUTRA /PERITORO C-1 MA RB FT LT 230 kV P.DUTRA /PERITORO C-1 MA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,924.86
  P.DUTRA EL 230 kV P.DUTRA LT 230 kV P.DUTRA /PERITORO C-1 MA RB FT LT 230 kV P.DUTRA /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,896.56
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,926.81
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV MIRANDA II /P.DUTRA C-1 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,957.74
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV MIRANDA II /P.DUTRA C-1 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,896.56
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,923.90
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 11,927.77
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,896.56
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 927,452.89
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBNI REA 5861/2016 6/3/2019 6/2/2034 11,923.90
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 058/2001 IPCA RBNI REA 5861/2016 6/3/2019 6/2/2034 11,923.90
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  P.DUTRA EL 69 kV P.DUTRA  BARRA CORDA DIT   058/2001 IPCA RCDM REN 443/2011 29/06/2017 28/06/2046 354,815.27
  P.DUTRA EL 69 kV P.DUTRA  CEMAR DIT   058/2001 IPCA RCDM REN 443/2011 29/06/2017 28/06/2046 354,815.27
  P.DUTRA EL 69 kV P.DUTRA  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  P.DUTRA EL 69 kV P.DUTRA  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  P.DUTRA IB 230 kV MG 500 kV P.DUTRA MG1 MA IB1 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB1 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB1 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB2 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB2 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB3 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB3 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB4 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB4 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  P.DUTRA IB 69 kV MG 500 kV P.DUTRA MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,564.67
  P.DUTRA IB 69 kV MG 500 kV P.DUTRA MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 33,381.90
  P.DUTRA MC 13,8 kV CS 100/-70 MVAr P.DUTRA CS1 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 59,739.15
  P.DUTRA MC 13,8 kV CS 100/-70 MVAr P.DUTRA CS2 MA RB FT CS 100/-70 MVAr P.DUTRA CS2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 59,739.15
  P.DUTRA MC 230 kV TR 230/13,8 kV P.DUTRA TF3 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  P.DUTRA MC 230 kV TR 230/69 kV P.DUTRA TF1 MA RBF FT TR 230/69 kV P.DUTRA TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  P.DUTRA MC 230 kV TR 230/69 kV P.DUTRA TF4 MA RBF FT TR 230/69 kV P.DUTRA TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  P.DUTRA MC 230 kV TR 230/69 kV P.DUTRA TF5 MA RBF FT TR 230/69 kV P.DUTRA TF5 MA 058/2001 IPCA RBNI REA 2533/2010 9/3/2012 9/2/2041 776,006.05
  P.DUTRA MC 230 kV TR 230/69 kV P.DUTRA TF6 MA RBF FT TR 230/69 kV P.DUTRA TF6 MA 058/2001 IPCA RBNIA REA 8348/2019     801,112.20
  P.DUTRA MC 230 kV TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  P.DUTRA MC 500 kV RTB 500 kV 150 MVAr P.DUTRA RT1 MA RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 383,886.18
  P.DUTRA MC 500 kV RTB 500 kV 150 MVAr P.DUTRA RT1 MA RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 298,233.08
  P.DUTRA MC 500 kV RTB 500 kV 150 MVAr P.DUTRA RT1 MA RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 766,416.66
  P.DUTRA MC 500 kV RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 383,886.18

 

117 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  P.DUTRA MC 500 kV RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 298,233.08
  P.DUTRA MC 500 kV RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 766,416.66
  P.DUTRA MC 500 kV RTL 500 kV 100 MVAr P.DUTRA RT5 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  P.DUTRA MC 500 kV RTL 500 kV 100 MVAr P.DUTRA RT6 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  P.DUTRA MC 500 kV RTL 500 kV 136 MVAr P.DUTRA RT2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  P.DUTRA MC 500 kV RTL 500 kV 136 MVAr P.DUTRA RT3 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  P.DUTRA MC 500 kV RTL 500 kV 136 MVAr P.DUTRA RT7 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  P.DUTRA MC 500 kV RTL 500 kV 150 MVAr P.DUTRA RT11 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  P.DUTRA MC 500 kV RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  P.DUTRA MC 500 kV RTL 500 kV 150 MVAr P.DUTRA RT8 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  P.DUTRA MC 500 kV TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,005.44
  P.DUTRA MC 69 kV TR 230/69 kV P.DUTRA TF1 MA RBF FT TR 230/69 kV P.DUTRA TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  P.DUTRA MC 69 kV TR 230/69 kV P.DUTRA TF4 MA RBF FT TR 230/69 kV P.DUTRA TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  P.DUTRA MC 69 kV TR 230/69 kV P.DUTRA TF5 MA RBF FT TR 230/69 kV P.DUTRA TF5 MA 058/2001 IPCA RBNI REA 2533/2010 9/3/2012 9/2/2044 291,525.25
  P.DUTRA MC 69 kV TR 230/69 kV P.DUTRA TF6 MA RBF FT TR 230/69 kV P.DUTRA TF6 MA 058/2001 IPCA RBNIA REA 8348/2019     303,158.23
  P.DUTRA MG 500 kV P.DUTRA MG1 MA RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBNI REN 443/2011 29/06/2017 28/06/2045 48,118.95
  P.DUTRA MG 500 kV P.DUTRA MG1 MA RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBNI REN 443/2011 29/06/2017 28/06/2045 48,118.95
  P.DUTRA MG 500 kV P.DUTRA MG1 MA RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,105,515.55
  P.DUTRA MG 500 kV P.DUTRA MG1 MA RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBNIA REA 8348/2019     140,754.50
  P.DUTRA MG 500 kV P.DUTRA MG1 MA RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBNIA REA 8348/2019     39,434.48
  P.DUTRA RTB 500 kV 150 MVAr P.DUTRA RT1 MA RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 765,528.78
  P.DUTRA RTB 500 kV 150 MVAr P.DUTRA RT1 MA RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 594,723.18
  P.DUTRA RTB 500 kV 150 MVAr P.DUTRA RT1 MA RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,528,354.09
  P.DUTRA RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 785,716.51
  P.DUTRA RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 610,406.60
  P.DUTRA RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,568,658.26
  P.DUTRA RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RMEL REN 443/2011 2/6/2017 2/5/2031 19,976.25
  P.DUTRA RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA RB FT RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 262,004.78
  P.DUTRA RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA RB FT RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 203,546.00
  P.DUTRA RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA RB FT RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 523,084.30
  P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT5 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 667,045.60
  P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT5 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 518,213.67
  P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT5 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,331,735.52
  P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT6 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 667,045.60
  P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT6 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 518,213.67
  P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT6 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,331,735.52
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 741,730.38
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 576,234.70
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,480,841.32
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT3 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RMEL REN 443/2011 10/8/2017 10/7/2051 18,396.44
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT3 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 741,730.38
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT3 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 576,234.70
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT3 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,480,841.32
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT7 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 741,730.38
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT7 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 576,234.70
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT7 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,480,841.32
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT7 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RMEL REN 443/2011 4/10/2017 4/9/2031 20,062.97
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT11 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 058/2001 IPCA RMEL REN 443/2011 19/11/2017 18/11/2047 17,347.07
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT11 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 765,528.78
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 765,528.78
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 594,723.18
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,528,354.09
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RMEL REN 443/2011 13/02/2017 2/12/2031 19,994.59
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RMEL REA 2837/2011 24/03/2013 23/03/2043 16,281.90
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT8 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2040 24,443.06
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT8 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 765,528.78
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT8 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 594,723.18
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT8 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,528,354.09
  P.DUTRA RTL 500 kV 33,3 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 33,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,267.53
  P.DUTRA RTL 500 kV 33,3 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 33,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 172,674.96
  P.DUTRA RTL 500 kV 33,3 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 33,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 443,750.12
  P.DUTRA RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 247,183.90
  P.DUTRA RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,031.97
  P.DUTRA RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 493,494.88
  P.DUTRA RTL 500 kV 50 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 50 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RMEL REN 443/2011 27/01/2017 26/01/2031 20,015.88
  P.DUTRA RTL 500 kV 50 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 50 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 255,176.26
  P.DUTRA RTL 500 kV 50 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 50 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 198,241.06
  P.DUTRA RTL 500 kV 50 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 50 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 509,451.36
  P.DUTRA TR 230/13,8 kV P.DUTRA TF3 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 626,565.89
  P.DUTRA TR 230/13,8 kV P.DUTRA TF3 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 486,765.84
  P.DUTRA TR 230/13,8 kV P.DUTRA TF3 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,250,919.07
  P.DUTRA TR 230/13,8 kV P.DUTRA TF3 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RMEL REN 443/2011 15/02/2017 14/02/2031 21,323.09
  P.DUTRA TR 230/13,8 kV P.DUTRA TRR3 MA RB FT TR 230/13,8 kV P.DUTRA TRR3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 208,858.46
  P.DUTRA TR 230/69 kV P.DUTRA TF1 MA RBF FT TR 230/69 kV P.DUTRA TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 244,520.55
  P.DUTRA TR 230/69 kV P.DUTRA TF1 MA RBF FT TR 230/69 kV P.DUTRA TF1 MA 058/2001 IPCA RMEL REN 443/2011 19/02/2017 18/02/2031 19,817.41
  P.DUTRA TR 230/69 kV P.DUTRA TF4 MA RBF FT TR 230/69 kV P.DUTRA TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 244,520.55
  P.DUTRA TR 230/69 kV P.DUTRA TF5 MA RBF FT TR 230/69 kV P.DUTRA TF5 MA 058/2001 IPCA RBNI REA 2533/2010 9/3/2012 9/2/2046 888,300.25
  P.DUTRA TR 230/69 kV P.DUTRA TF6 MA RBF FT TR 230/69 kV P.DUTRA TF6 MA 058/2001 IPCA RBNIA REA 8348/2019     1,145,576.63
  P.DUTRA TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,439,287.63
  P.DUTRA TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,118,152.23
  P.DUTRA TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,873,492.40
  P.DUTRA TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RMEL REN 443/2011 14/05/2017 13/05/2031 25,506.87
  P.DUTRA TR 500/230 kV P.DUTRA TRR1 MA RB FT TR 500/230 kV P.DUTRA TRR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 479,762.54
  P.DUTRA TR 500/230 kV P.DUTRA TRR1 MA RB FT TR 500/230 kV P.DUTRA TRR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 372,717.41
  P.DUTRA TR 500/230 kV P.DUTRA TRR1 MA RB FT TR 500/230 kV P.DUTRA TRR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 957,830.80
  P.DUTRA TT 69/0 kV P.DUTRA TT1 MA DIT   058/2001 IPCA RCDM REN 443/2011 30/11/2019 29/11/2049 189,712.78
  PERITORO BC 230 kV 20 Mvar PERITORO BC1 MA RB FT BC 230 kV 20 Mvar PERITORO BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 114,995.18
  PERITORO EL 13,8 kV PERITORO  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  PERITORO EL 13,8 kV PERITORO  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  PERITORO EL 230 kV PERITORO LT 230 kV MIRANDA II /PERITORO C-1 MA RB FT LT 230 kV MIRANDA II /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  PERITORO EL 230 kV PERITORO LT 230 kV P.DUTRA /PERITORO C-1 MA RB FT LT 230 kV P.DUTRA /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  PERITORO EL 230 kV PERITORO LT 230 kV PERITORO /COELHO NETO C-1 MA RB FT LT 230 kV PERITORO /COELHO NETO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  PERITORO EL 69 kV PERITORO  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  PERITORO EL 69 kV PERITORO  DIST10 DIT   058/2001 IPCA RCDM REN 443/2011 8/8/2019 8/7/2047 351,615.13
  PERITORO EL 69 kV PERITORO  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  PERITORO EL 69 kV PERITORO  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  PERITORO EL 69 kV PERITORO  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  PERITORO EL 69 kV PERITORO  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  PERITORO EL 69 kV PERITORO  DIST5 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,064.38
  PERITORO EL 69 kV PERITORO  DIST5 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 150,528.45
  PERITORO EL 69 kV PERITORO  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  PERITORO EL 69 kV PERITORO  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,064.38
  PERITORO EL 69 kV PERITORO  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 150,528.45
  PERITORO EL 69 kV PERITORO  DIST7 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  PERITORO EL 69 kV PERITORO  DIST8 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  PERITORO EL 69 kV PERITORO  DIST9 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  PERITORO IB 230 kV MG 230 kV PERITORO MG1 MA IB1 RB FT MG 230 kV PERITORO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  PERITORO IB 69 kV MG 230 kV PERITORO MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,564.67
  PERITORO MC 230 kV BC 230 kV 20 Mvar PERITORO BC1 MA RB FT BC 230 kV 20 Mvar PERITORO BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,735.57
  PERITORO MC 230 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 319,857.11

 

118 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  PERITORO MC 230 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  PERITORO MC 230 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 124,464.90
  PERITORO MC 230 kV TR 230/69 kV PERITORO TF2 MA RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  PERITORO MC 230 kV TR 230/69 kV PERITORO TF2 MA RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 124,464.90
  PERITORO MC 230 kV TR 230/69 kV PERITORO TF2 MA RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 319,857.11
  PERITORO MC 230 kV TR 230/69 kV PERITORO TR3 MA RBF FT TR 230/69 kV PERITORO TR3 MA 058/2001 IPCA RBNI REA 2533/2010 9/3/2012 9/2/2042 768,818.34
  PERITORO MC 69 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  PERITORO MC 69 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 48,177.12
  PERITORO MC 69 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 123,808.35
  PERITORO MC 69 kV TR 230/69 kV PERITORO TF2 MA RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  PERITORO MC 69 kV TR 230/69 kV PERITORO TF2 MA RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 48,177.12
  PERITORO MC 69 kV TR 230/69 kV PERITORO TF2 MA RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 123,808.35
  PERITORO MC 69 kV TR 230/69 kV PERITORO TR3 MA RBF FT TR 230/69 kV PERITORO TR3 MA 058/2001 IPCA RBNI REA 2533/2010 9/3/2012 9/2/2042 291,919.72
  PERITORO MG 230 kV PERITORO MG1 MA RB FT MG 230 kV PERITORO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 541,816.11
  PERITORO MG 230 kV PERITORO MG1 MA RB FT MG 230 kV PERITORO MG1 MA 058/2001 IPCA RBNI REA 2533/2010 9/3/2012 9/2/2039 177,571.73
  PERITORO MG 230 kV PERITORO MG1 MA RB FT MG 230 kV PERITORO MG1 MA 058/2001 IPCA RBNI REN 443/2011 8/8/2019 8/7/2050 31,544.53
  PERITORO TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  PERITORO TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 271,502.61
  PERITORO TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 697,723.14
  PERITORO TR 230/69 kV PERITORO TF2 MA RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  PERITORO TR 230/69 kV PERITORO TR3 MA RBF FT TR 230/69 kV PERITORO TR3 MA 058/2001 IPCA RBNI REA 2533/2010 9/3/2012 9/2/2046 1,173,091.52
  PERITORO TT 69/0 kV PERITORO TT1 MA DIT   058/2001 IPCA RCDM REN 443/2011 5/9/2014 5/8/2044 119,280.24
  PIMENTA BUENO BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2032 253,738.45
  PIMENTA BUENO BC 230 kV 18 Mvar PIMENTA BUENO BC2 RO RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC2 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2032 254,060.81
  PIMENTA BUENO BC 230 kV 18 Mvar PIMENTA BUENO BC3 RO RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC3 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2032 254,060.81
  PIMENTA BUENO EL 230 kV PIMENTA BUENO LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  PIMENTA BUENO EL 230 kV PIMENTA BUENO LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 601,335.31
  PIMENTA BUENO EL 230 kV PIMENTA BUENO LT 230 kV PIMENTA BUENO /VILHENA C-1 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  PIMENTA BUENO EL 230 kV PIMENTA BUENO LT 230 kV PIMENTA BUENO /VILHENA C-3 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 601,335.31
  PIMENTA BUENO IB 230 kV MG 230 kV PIMENTA BUENO MG1 RO IB1 RB FT MG 230 kV PIMENTA BUENO MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  PIMENTA BUENO MC 138 kV TR 230/138 kV PIMENTA BUENO TR1 RO RBF FT TR 230/138 kV PIMENTA BUENO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 101,803.73
  PIMENTA BUENO MC 138 kV TR 230/138 kV PIMENTA BUENO TR1 RO RBF FT TR 230/138 kV PIMENTA BUENO TR1 RO 058/2001 IPCA RBNI REA 3470/2012 4/8/2015 4/7/2045 38,023.18
  PIMENTA BUENO MC 138 kV TR 230/138 kV PIMENTA BUENO TR2 RO RBF FT TR 230/138 kV PIMENTA BUENO TR2 RO 058/2001 IPCA RBNI REA 3470/2012 4/8/2015 4/7/2045 38,023.18
  PIMENTA BUENO MC 138 kV TR 230/138 kV PIMENTA BUENO TR2 RO RBF FT TR 230/138 kV PIMENTA BUENO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 101,803.73
  PIMENTA BUENO MC 230 kV BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO MC1 RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2043 676,568.58
  PIMENTA BUENO MC 230 kV BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO MC2 RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2042 190,514.46
  PIMENTA BUENO MC 230 kV BC 230 kV 18 Mvar PIMENTA BUENO BC2 RO RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC2 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2043 676,579.00
  PIMENTA BUENO MC 230 kV BC 230 kV 18 Mvar PIMENTA BUENO BC3 RO RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC3 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2043 676,579.00
  PIMENTA BUENO MC 230 kV RTB 230 kV 20 Mvar PIMENTA BUENO RT2 RO RB FT RTB 230 kV 20 Mvar PIMENTA BUENO RT2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,194.36
  PIMENTA BUENO MC 230 kV RTL 230 kV 0 Mvar PIMENTA BUENO RT4 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 197,047.17
  PIMENTA BUENO MC 230 kV RTN 230 kV 0,1 Mvar PIMENTA BUENO RN1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,271.34
  PIMENTA BUENO MC 230 kV TR 230/138 kV PIMENTA BUENO TR1 RO RBF FT TR 230/138 kV PIMENTA BUENO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  PIMENTA BUENO MC 230 kV TR 230/138 kV PIMENTA BUENO TR2 RO RBF FT TR 230/138 kV PIMENTA BUENO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  PIMENTA BUENO MG 230 kV PIMENTA BUENO MG1 RO RB FT MG 230 kV PIMENTA BUENO MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 510,592.80
  PIMENTA BUENO MG 230 kV PIMENTA BUENO MG1 RO RB FT MG 230 kV PIMENTA BUENO MG1 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2040 472,834.23
  PIMENTA BUENO RTB 230 kV 20 Mvar PIMENTA BUENO RT2 RO RB FT RTB 230 kV 20 Mvar PIMENTA BUENO RT2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,023.72
  PIMENTA BUENO RTL 230 kV 0 Mvar PIMENTA BUENO RT4 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 593,832.01
  PIMENTA BUENO RTL 230 kV 20 Mvar PIMENTA BUENO RT1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,023.72
  PIMENTA BUENO RTN 230 kV 0,1 Mvar PIMENTA BUENO RN1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  PIMENTA BUENO TR 230/138 kV PIMENTA BUENO TR1 RO RBF FT TR 230/138 kV PIMENTA BUENO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 271,508.47
  PIMENTA BUENO TR 230/138 kV PIMENTA BUENO TR2 RO RBF FT TR 230/138 kV PIMENTA BUENO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 271,508.47
  PORTO FRANCO EL 138 kV PORTO FRANCO  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 169,270.79
  PORTO FRANCO EL 138 kV PORTO FRANCO  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 132,752.83
  PORTO FRANCO EL 138 kV PORTO FRANCO  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 344,153.83
  PORTO FRANCO EL 138 kV PORTO FRANCO  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 169,270.79
  PORTO FRANCO EL 138 kV PORTO FRANCO  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 132,752.83
  PORTO FRANCO EL 138 kV PORTO FRANCO  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 344,153.83
  PORTO FRANCO EL 230 kV PORTO FRANCO LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  PORTO FRANCO EL 230 kV PORTO FRANCO LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 167,801.30
  PORTO FRANCO EL 230 kV PORTO FRANCO LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 431,225.49
  PORTO FRANCO EL 69 kV PORTO FRANCO  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  PORTO FRANCO EL 69 kV PORTO FRANCO  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,064.38
  PORTO FRANCO EL 69 kV PORTO FRANCO  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 150,528.45
  PORTO FRANCO EL 69 kV PORTO FRANCO  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  PORTO FRANCO EL 69 kV PORTO FRANCO  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,064.38
  PORTO FRANCO EL 69 kV PORTO FRANCO  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 150,528.45
  PORTO FRANCO EL 69 kV PORTO FRANCO  SE SITIO NOVO DIT   058/2001 IPCA RCDM REN 443/2011 16/08/2017 15/08/2045 310,053.32
  PORTO FRANCO IB 138 kV MG 230 kV PORTO FRANCO MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,705.91
  PORTO FRANCO IB 69 kV MG 230 kV PORTO FRANCO MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,564.67
  PORTO FRANCO IB 69 kV MG 230 kV PORTO FRANCO MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 33,381.90
  PORTO FRANCO IB 69 kV MG 230 kV PORTO FRANCO MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 86,540.59
  PORTO FRANCO MC 13,8 kV TR 230/138 kV PORTO FRANCO TR3 MA RBF FT TR 230/138 kV PORTO FRANCO TR3 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2044 27,045.14
  PORTO FRANCO MC 138 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,162.41
  PORTO FRANCO MC 138 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 86,359.74
  PORTO FRANCO MC 138 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 221,932.26
  PORTO FRANCO MC 138 kV TR 230/138 kV PORTO FRANCO TR2 MA RBF FT TR 230/138 kV PORTO FRANCO TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,162.41
  PORTO FRANCO MC 138 kV TR 230/138 kV PORTO FRANCO TR3 MA RBF FT TR 230/138 kV PORTO FRANCO TR3 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2046 655,196.30
  PORTO FRANCO MC 230 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  PORTO FRANCO MC 230 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 118,106.27
  PORTO FRANCO MC 230 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 303,516.33
  PORTO FRANCO MC 230 kV TR 230/138 kV PORTO FRANCO TR2 MA RBF FT TR 230/138 kV PORTO FRANCO TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  PORTO FRANCO MC 230 kV TR 230/138 kV PORTO FRANCO TR3 MA RBF FT TR 230/138 kV PORTO FRANCO TR3 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2045 795,415.57
  PORTO FRANCO MC 230 kV TR 230/69 kV PORTO FRANCO TF1 MA RBF FT TR 230/69 kV PORTO FRANCO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  PORTO FRANCO MC 230 kV TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  PORTO FRANCO MC 230 kV TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 118,106.27
  PORTO FRANCO MC 230 kV TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 303,516.33
  PORTO FRANCO MC 230 kV TR 230/69 kV PORTO FRANCO TF3 MA RBF FT TR 230/69 kV PORTO FRANCO TF3 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2046 1,261,956.84
  PORTO FRANCO MC 69 kV TR 230/69 kV PORTO FRANCO TF1 MA RBF FT TR 230/69 kV PORTO FRANCO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  PORTO FRANCO MC 69 kV TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  PORTO FRANCO MC 69 kV TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 48,177.12
  PORTO FRANCO MC 69 kV TR 230/69 kV PORTO FRANCO TF3 MA RBF FT TR 230/69 kV PORTO FRANCO TF3 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2046 583,943.86
  PORTO FRANCO MC 69 kV TT 69/0 kV PORTO FRANCO TA3 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2047 220,252.21
  PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 552,406.53
  PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 429,152.99
  PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,102,862.23
  PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2042 163,133.37
  PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2041 103,045.98
  PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REN 443/2011 16/08/2017 15/08/2048 36,891.15
  PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2044 290,271.22
  PORTO FRANCO TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 366,799.00
  PORTO FRANCO TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 284,958.42
  PORTO FRANCO TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 732,302.65
  PORTO FRANCO TR 230/138 kV PORTO FRANCO TR2 MA RBF FT TR 230/138 kV PORTO FRANCO TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 366,799.00
  PORTO FRANCO TR 230/138 kV PORTO FRANCO TR3 MA RBF FT TR 230/138 kV PORTO FRANCO TR3 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2049 1,174,740.66
  PORTO FRANCO TR 230/69 kV PORTO FRANCO TF1 MA RBF FT TR 230/69 kV PORTO FRANCO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 181,602.14
  PORTO FRANCO TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 181,602.14
  PORTO FRANCO TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 141,082.88
  PORTO FRANCO TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 362,562.96
  PORTO FRANCO TR 230/69 kV PORTO FRANCO TF3 MA RBF FT TR 230/69 kV PORTO FRANCO TF3 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2050 822,692.37
  PORTO FRANCO TT 69/0 kV PORTO FRANCO TA3 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2046 129,920.13

 

119 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV ABUNA /PORTO VELHO C-1 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBNI REA 5861/2016 17/06/2019 16/06/2034 12,744.09
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV ABUNA /PORTO VELHO C-1 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV ABUNA /PORTO VELHO C-2 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 615,869.09
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV ABUNA /PORTO VELHO C-2 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBNI REA 5861/2016 6/7/2019 6/6/2034 12,738.93
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO 010/2009 IPCA RBNI REA 5861/2016 6/7/2019 6/6/2034 12,738.93
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 332,503.24
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO 010/2009 IPCA RBL CC 010/2009 9/6/2012 26/02/2039 332,503.24
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO 010/2009 IPCA RBNI REA 5861/2016 17/06/2019 16/06/2034 12,738.93
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBNI REA 5861/2016 6/7/2019 6/6/2034 12,744.09
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBNI REA 5833/2016 20/10/2017 19/10/2047 150,196.99
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBNI REA 5833/2016 20/10/2017 19/10/2047 150,196.99
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,744.09
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-3 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 601,335.31
  PORTO VELHO IB 230 kV MG 230 kV PORTO VELHO MG1 RO IB1 RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  PORTO VELHO IB 230 kV MG 230 kV PORTO VELHO MG1 RO IB1 RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RBNI REA 2533/2010 25/06/2012 24/06/2042 8,295.30
  PORTO VELHO MC 230 kV TR 230/69 kV PORTO VELHO TR1 RO RBF FT TR 230/69 kV PORTO VELHO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  PORTO VELHO MC 230 kV TR 230/69 kV PORTO VELHO TR2 RO RBF FT TR 230/69 kV PORTO VELHO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  PORTO VELHO MC 230 kV TR 230/69 kV PORTO VELHO TR3 RO RBF FT TR 230/69 kV PORTO VELHO TR3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  PORTO VELHO MC 230 kV TR 230/69 kV PORTO VELHO TR4 RO RBF FT TR 230/69 kV PORTO VELHO TR4 RO 058/2001 IPCA RBNI REA 2533/2010 25/06/2012 24/06/2042 765,929.86
  PORTO VELHO MC 69 kV TR 230/69 kV PORTO VELHO TR1 RO RBF FT TR 230/69 kV PORTO VELHO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,961.19
  PORTO VELHO MC 69 kV TR 230/69 kV PORTO VELHO TR2 RO RBF FT TR 230/69 kV PORTO VELHO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,961.19
  PORTO VELHO MC 69 kV TR 230/69 kV PORTO VELHO TR3 RO RBF FT TR 230/69 kV PORTO VELHO TR3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,961.19
  PORTO VELHO MC 69 kV TR 230/69 kV PORTO VELHO TR4 RO RBF FT TR 230/69 kV PORTO VELHO TR4 RO 058/2001 IPCA RBNI REA 2533/2010 25/06/2012 24/06/2043 302,089.22
  PORTO VELHO MG 230 kV PORTO VELHO MG1 RO RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RBNI REA 2533/2010 25/06/2012 24/06/2038 199,523.59
  PORTO VELHO MG 230 kV PORTO VELHO MG1 RO RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RMEL REN 443/2011 9/1/2016 31/08/2033 200,211.12
  PORTO VELHO MG 230 kV PORTO VELHO MG1 RO RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 491,146.68
  PORTO VELHO TR 230/69 kV PORTO VELHO TR1 RO RBF FT TR 230/69 kV PORTO VELHO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  PORTO VELHO TR 230/69 kV PORTO VELHO TR1 RO RBF FT TR 230/69 kV PORTO VELHO TR1 RO 058/2001 IPCA RBNI REA 5861/2016 19/06/2019 18/06/2054 227,364.14
  PORTO VELHO TR 230/69 kV PORTO VELHO TR2 RO RBF FT TR 230/69 kV PORTO VELHO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  PORTO VELHO TR 230/69 kV PORTO VELHO TR3 RO RBF FT TR 230/69 kV PORTO VELHO TR3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  PORTO VELHO TR 230/69 kV PORTO VELHO TR4 RO RBF FT TR 230/69 kV PORTO VELHO TR4 RO 058/2001 IPCA RBNI REA 2533/2010 25/06/2012 24/06/2046 1,215,311.71
  RIB.GONCALVES EL 230 kV RIB.GONCALVES LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA RB FT LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 267,611.65
  RIB.GONCALVES EL 69 kV RIB.GONCALVES  DIST1 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 43,067.87
  RIB.GONCALVES IB 230 kV MG 500 kV RIB.GONCALVES MG3 PI IB1 RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 128,411.59
  RIB.GONCALVES IB 500 kV MG 500 kV RIB.GONCALVES MG3 PI IB1 RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 213,521.23
  RIB.GONCALVES IB 500 kV MG 500 kV RIB.GONCALVES MG3 PI IB2 RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2046 1,359,729.93
  RIB.GONCALVES IB 69 kV MG 500 kV RIB.GONCALVES MG3 PI IB1 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 20,488.16
  RIB.GONCALVES MC 230 kV TR 230/69 kV RIB.GONCALVES TR1 PI RBF FT TR 230/69 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 232,231.93
  RIB.GONCALVES MC 230 kV TR 230/69 kV RIB.GONCALVES TR2 PI RBF FT TR 230/69 kV RIB.GONCALVES TR2 PI 001/2009 IPCA RBNIA REA 8542/2020     748,432.20
  RIB.GONCALVES MC 230 kV TR 230/69 kV RIB.GONCALVES TR2 PI RBF FT TR 230/69 kV RIB.GONCALVES TR2 PI 001/2009 IPCA RBNIA REA 8542/2020     280,814.53
  RIB.GONCALVES MC 230 kV TR 500/230 kV RIB.GONCALVES AT2 PI RB FT TR 500/230 kV RIB.GONCALVES AT2 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2040 789,169.16
  RIB.GONCALVES MC 230 kV TR 500/230 kV RIB.GONCALVES TR1 PI RB FT TR 500/230 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 232,231.93
  RIB.GONCALVES MC 230 kV TR 500/230 kV RIB.GONCALVES TR1 PI RB FT TR 500/230 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBNI REA 4745/2014 30/08/2016 30/08/2046 53,457.10
  RIB.GONCALVES MC 500 kV TR 500/230 kV RIB.GONCALVES AT2 PI RB FT TR 500/230 kV RIB.GONCALVES AT2 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2044 1,476,855.60
  RIB.GONCALVES MC 500 kV TR 500/230 kV RIB.GONCALVES TR1 PI RB FT TR 500/230 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 554,166.39
  RIB.GONCALVES MC 69 kV TR 230/69 kV RIB.GONCALVES TR1 PI RBF FT TR 230/69 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 42,442.93
  RIB.GONCALVES MC 69 kV TT 69/0 kV RIB.GONCALVES TT1 PI DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 24,803.91
  RIB.GONCALVES MG 500 kV RIB.GONCALVES MG3 PI RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 2,520,741.45
  RIB.GONCALVES MG 500 kV RIB.GONCALVES MG3 PI RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2047 503,173.69
  RIB.GONCALVES MG 500 kV RIB.GONCALVES MG3 PI RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2047 133,605.68
  RIB.GONCALVES MG 500 kV RIB.GONCALVES MG3 PI RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBNIA REA 8542/2020     158,131.71
  RIB.GONCALVES TR 230/69 kV RIB.GONCALVES TR1 PI RBF FT TR 230/69 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 229,432.81
  RIB.GONCALVES TR 230/69 kV RIB.GONCALVES TR2 PI RBF FT TR 230/69 kV RIB.GONCALVES TR2 PI 001/2009 IPCA RBNIA REA 8542/2020     797,089.68
  RIB.GONCALVES TR 500/230 kV RIB.GONCALVES AT2 PI RB FT TR 500/230 kV RIB.GONCALVES AT2 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2050 4,091,600.59
  RIB.GONCALVES TR 500/230 kV RIB.GONCALVES TR1 PI RB FT TR 500/230 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 1,522,109.56
  RIB.GONCALVES TR 500/230 kV RIB.GONCALVES TRR1 PI RB FT TR 500/230 kV RIB.GONCALVES TRR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 507,369.85
  RIB.GONCALVES TT 69/0 kV RIB.GONCALVES TT1 PI DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 99,213.91
  RIO BRANCO 1 BC 230 kV 0 Mvar RIO BRANCO 1 BC2 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC2 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2038 531,150.11
  RIO BRANCO 1 BC 230 kV 0 Mvar RIO BRANCO 1 BC3 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC3 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2038 531,150.11
  RIO BRANCO 1 BC 230 kV 0 Mvar RIO BRANCO 1 BC4 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC4 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2038 531,150.11
  RIO BRANCO 1 BC 230 kV 0 Mvar RIO BRANCO 1 BC5 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC5 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2038 531,150.11
  RIO BRANCO 1 BC 230 kV 18 Mvar RIO BRANCO 1 BC1 AC RB FT BC 230 kV 18 Mvar RIO BRANCO 1 BC1 AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 252,671.21
  RIO BRANCO 1 CE 55/-20 Mvar RIO BRANCO 1 CE1 AC RB FT CE 55/-20 Mvar RIO BRANCO 1 CE1 AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 5,182,174.06
  RIO BRANCO 1 EL 138 kV RIO BRANCO 1  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 169,270.79
  RIO BRANCO 1 EL 230 kV RIO BRANCO 1 LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 210,404.74
  RIO BRANCO 1 EL 230 kV RIO BRANCO 1 LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 615,869.09
  RIO BRANCO 1 IB 138 kV MG 230 kV RIO BRANCO 1 MG1 AC IB1 DIT   058/2001 IPCA RCDM REA 2911/2011 9/9/2013 9/8/2043 504,897.07
  RIO BRANCO 1 IB 230 kV MG 230 kV RIO BRANCO 1 MG1 AC IB1 RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 2533/2010 10/5/2012 10/4/2042 8,361.17
  RIO BRANCO 1 IB 230 kV MG 230 kV RIO BRANCO 1 MG1 AC IB1 RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 114,580.72
  RIO BRANCO 1 MC 138 kV TR 230/138 kV RIO BRANCO 1 TR1 AC RBF FT TR 230/138 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBNI REA 2911/2011 9/9/2013 9/8/2045 645,122.13
  RIO BRANCO 1 MC 138 kV TR 230/138 kV RIO BRANCO 1 TR2 AC RBF FT TR 230/138 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBNI REA 2911/2011 9/2/2013 9/1/2042 648,111.94
  RIO BRANCO 1 MC 230 kV BC 230 kV 0 Mvar RIO BRANCO 1 BC2 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC2 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2041 552,876.84
  RIO BRANCO 1 MC 230 kV BC 230 kV 0 Mvar RIO BRANCO 1 BC3 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC3 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2041 552,876.84
  RIO BRANCO 1 MC 230 kV BC 230 kV 0 Mvar RIO BRANCO 1 BC4 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC4 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2041 552,876.84
  RIO BRANCO 1 MC 230 kV BC 230 kV 0 Mvar RIO BRANCO 1 BC5 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC5 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2041 552,876.84
  RIO BRANCO 1 MC 230 kV BC 230 kV 18 Mvar RIO BRANCO 1 BC1 AC RB FT BC 230 kV 18 Mvar RIO BRANCO 1 BC1 AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 456,705.80
  RIO BRANCO 1 MC 230 kV CE 55/-20 Mvar RIO BRANCO 1 CE1 AC RB FT CE 55/-20 Mvar RIO BRANCO 1 CE1 AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 457,685.64
  RIO BRANCO 1 MC 230 kV RTB 230 kV 0 Mvar RIO BRANCO 1 RT4 AC RB FT RTB 230 kV 0 Mvar RIO BRANCO 1 RT4 AC 058/2001 IPCA RBNI REA 4857/2014 9/12/2016 9/11/2045 783,639.76
  RIO BRANCO 1 MC 230 kV RTB 230 kV 20 Mvar RIO BRANCO 1 RT2 AC RB FT RTB 230 kV 20 Mvar RIO BRANCO 1 RT2 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,943.00
  RIO BRANCO 1 MC 230 kV RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC RB FT RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  RIO BRANCO 1 MC 230 kV RTL 230 kV 30 Mvar RIO BRANCO 1 RT3 AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 201,809.64
  RIO BRANCO 1 MC 230 kV TR 230/138 kV RIO BRANCO 1 TR1 AC RBF FT TR 230/138 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,775.24
  RIO BRANCO 1 MC 230 kV TR 230/138 kV RIO BRANCO 1 TR2 AC RBF FT TR 230/138 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBNI REA 2911/2011 9/2/2013 9/1/2042 768,549.10
  RIO BRANCO 1 MC 230 kV TR 230/69 kV RIO BRANCO 1 TR1 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,775.24
  RIO BRANCO 1 MC 230 kV TR 230/69 kV RIO BRANCO 1 TR2 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,775.24
  RIO BRANCO 1 MC 230 kV TR 230/69 kV RIO BRANCO 1 TR3 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR3 AC 058/2001 IPCA RBNI REA 2533/2010 10/5/2012 10/4/2042 742,025.56
  RIO BRANCO 1 MC 230 kV TR 230/69 kV RIO BRANCO 1 TR4 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR4 AC 058/2001 IPCA RBNI REA 5746/2016 24/04/2018 24/04/2041 603,908.60
  RIO BRANCO 1 MC 69 kV RTN 69 kV 0 Mvar RIO BRANCO 1 RN1 AC RB FT RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,271.34
  RIO BRANCO 1 MC 69 kV TR 230/69 kV RIO BRANCO 1 TR1 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  RIO BRANCO 1 MC 69 kV TR 230/69 kV RIO BRANCO 1 TR2 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  RIO BRANCO 1 MC 69 kV TR 230/69 kV RIO BRANCO 1 TR3 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR3 AC 058/2001 IPCA RBNI REA 2533/2010 10/5/2012 10/4/2042 308,278.97
  RIO BRANCO 1 MC 69 kV TR 230/69 kV RIO BRANCO 1 TR4 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR4 AC 058/2001 IPCA RBNI REA 5746/2016 24/04/2018 24/04/2040 273,427.71
  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 4857/2014 9/12/2016 9/11/2042 175,934.17
  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 2911/2011 9/9/2013 9/8/2041 891,649.62
  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 2911/2011 9/9/2013 9/8/2041 243,659.50
  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 2533/2010 10/5/2012 10/4/2039 200,940.96
  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2049 268,895.96
  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 5746/2016 24/04/2018 24/04/2049 66,811.44
  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 5746/2016 24/04/2018 24/04/2049 17,248.96
  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 537,367.04
  RIO BRANCO 1 RTB 230 kV 0 Mvar RIO BRANCO 1 RT4 AC RB FT RTB 230 kV 0 Mvar RIO BRANCO 1 RT4 AC 058/2001 IPCA RBNI REA 4857/2014 9/12/2016 9/11/2051 553,618.01
  RIO BRANCO 1 RTB 230 kV 20 Mvar RIO BRANCO 1 RT2 AC RB FT RTB 230 kV 20 Mvar RIO BRANCO 1 RT2 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,023.72
  RIO BRANCO 1 RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC RB FT RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 228,110.37
  RIO BRANCO 1 RTL 230 kV 30 Mvar RIO BRANCO 1 RT3 AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 613,404.53
  RIO BRANCO 1 RTN 69 kV 0 Mvar RIO BRANCO 1 RN1 AC RB FT RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  RIO BRANCO 1 RTS 230 kV 0 Mvar RIO BRANCO 1 RLC1 AC RB FT BC 230 kV 18 Mvar RIO BRANCO 1 BC1 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2053 51,691.26
  RIO BRANCO 1 RTS 230 kV 0 Mvar RIO BRANCO 1 RLC2 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC2 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2053 51,691.26

 

120 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  RIO BRANCO 1 RTS 230 kV 0 Mvar RIO BRANCO 1 RLC3 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC3 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2053 51,691.26
  RIO BRANCO 1 RTS 230 kV 0 Mvar RIO BRANCO 1 RLC4 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC4 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2053 51,691.26
  RIO BRANCO 1 RTS 230 kV 0 Mvar RIO BRANCO 1 RLC5 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC5 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2053 51,691.26
  RIO BRANCO 1 TR 230/138 kV RIO BRANCO 1 TR1 AC RBF FT TR 230/138 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 271,508.47
  RIO BRANCO 1 TR 230/138 kV RIO BRANCO 1 TR2 AC RBF FT TR 230/138 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBNI REA 2911/2011 9/2/2013 9/1/2046 923,162.51
  RIO BRANCO 1 TR 230/69 kV RIO BRANCO 1 TR1 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  RIO BRANCO 1 TR 230/69 kV RIO BRANCO 1 TR2 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  RIO BRANCO 1 TR 230/69 kV RIO BRANCO 1 TR3 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR3 AC 058/2001 IPCA RBNI REA 2533/2010 10/5/2012 10/4/2046 1,223,246.95
  RIO BRANCO 1 TR 230/69 kV RIO BRANCO 1 TR4 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR4 AC 058/2001 IPCA RBNI REA 5746/2016 24/04/2018 24/04/2052 1,443,071.24
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 52,365.29
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 40,681.49
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 104,545.64
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 52,365.29
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 40,681.49
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 104,545.64
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 52,365.29
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 40,681.49
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 104,545.64
  RONDONOPOLIS BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 147,632.60
  RONDONOPOLIS BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 114,692.65
  RONDONOPOLIS BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 294,743.83
  RONDONOPOLIS EL 13,8 kV RONDONOPOLIS  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 173,588.35
  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 446,097.39
  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV RONDONOPOLIS /COXIPO C-1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 173,588.35
  RONDONOPOLIS IB 230 kV MG 230 kV RONDONOPOLIS MG1 MT IB1 RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  RONDONOPOLIS IB 230 kV MG 230 kV RONDONOPOLIS MG1 MT IB1 RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBNI REA 4514/2014 2/3/2016 2/2/2044 60,709.72
  RONDONOPOLIS MC 13,8 kV BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,453.45
  RONDONOPOLIS MC 13,8 kV BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,453.45
  RONDONOPOLIS MC 13,8 kV BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,453.45
  RONDONOPOLIS MC 13,8 kV TR 230/138 kV RONDONOPOLIS TR1 MT RBF FT TR 230/138 kV RONDONOPOLIS TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 44,181.71
  RONDONOPOLIS MC 13,8 kV TT 13,8/13,8 kV RONDONOPOLIS TT1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 26,486.05
  RONDONOPOLIS MC 138 kV TR 230/138 kV RONDONOPOLIS TR3 MT RBF FT TR 230/138 kV RONDONOPOLIS TR3 MT 058/2001 IPCA RBNI REA 3216/2011 23/11/2015 22/11/2045 700,047.23
  RONDONOPOLIS MC 138 kV TR 230/138 kV RONDONOPOLIS TR4 MT RBF FT TR 230/138 kV RONDONOPOLIS TR4 MT 058/2001 IPCA RBNI REA 4514/2014 2/3/2016 2/2/2047 657,770.73
  RONDONOPOLIS MC 230 kV BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 166,044.60
  RONDONOPOLIS MC 230 kV BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 128,996.55
  RONDONOPOLIS MC 230 kV BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 331,502.81
  RONDONOPOLIS MC 230 kV RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT RB FT RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT 058/2001 IPCA RBNI REA 4514/2014 29/10/2015 28/10/2044 855,862.15
  RONDONOPOLIS MC 230 kV RTL 230 kV 20 MVAr RONDONOPOLIS RT4 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  RONDONOPOLIS MC 230 kV RTL 230 kV 30 MVAr RONDONOPOLIS RT1 MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  RONDONOPOLIS MC 230 kV RTL 230 kV 30 MVAr RONDONOPOLIS RT2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR1 MT RBF FT TR 230/138 kV RONDONOPOLIS TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 124,464.90
  RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 319,857.11
  RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR3 MT RBF FT TR 230/138 kV RONDONOPOLIS TR3 MT 058/2001 IPCA RBNI REA 3216/2011 23/11/2015 22/11/2045 889,556.18
  RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR4 MT RBF FT TR 230/138 kV RONDONOPOLIS TR4 MT 058/2001 IPCA RBNI REA 4514/2014 2/3/2016 2/2/2045 894,812.86
  RONDONOPOLIS MG 230 kV RONDONOPOLIS MG1 MT RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 530,969.80
  RONDONOPOLIS MG 230 kV RONDONOPOLIS MG1 MT RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBNI REA 3216/2011 23/11/2015 22/11/2043 172,833.57
  RONDONOPOLIS MG 230 kV RONDONOPOLIS MG1 MT RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBNI REA 3216/2011 23/11/2015 22/11/2043 108,839.14
  RONDONOPOLIS MG 230 kV RONDONOPOLIS MG1 MT RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBNI REA 4514/2014 2/3/2016 2/2/2043 284,042.82
  RONDONOPOLIS RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT RB FT RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,740.23
  RONDONOPOLIS RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT RB FT RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 277,920.85
  RONDONOPOLIS RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT RB FT RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 714,217.11
  RONDONOPOLIS RTL 230 kV 20 MVAr RONDONOPOLIS RT4 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,506.77
  RONDONOPOLIS RTL 230 kV 20 MVAr RONDONOPOLIS RT4 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 221,804.19
  RONDONOPOLIS RTL 230 kV 20 MVAr RONDONOPOLIS RT4 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 570,005.26
  RONDONOPOLIS RTL 230 kV 20 MVAr RONDONOPOLIS RT4 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RMEL REN 443/2011 13/06/2017 6/12/2031 36,966.89
  RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT1 MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,740.23
  RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT1 MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 277,920.85
  RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT1 MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 714,217.11
  RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,740.23
  RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 277,920.85
  RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 714,217.11
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR1 MT RBF FT TR 230/138 kV RONDONOPOLIS TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,322.37
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR1 MT RBF FT TR 230/138 kV RONDONOPOLIS TR1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 418,988.19
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RMEL REN 443/2011 6/9/2017 6/8/2031 45,238.87
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 366,799.00
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 284,958.42
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 732,302.65
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR3 MT RBF FT TR 230/138 kV RONDONOPOLIS TR3 MT 058/2001 IPCA RBNI REA 3216/2011 23/11/2015 22/11/2049 1,247,349.04
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR4 MT RBF FT TR 230/138 kV RONDONOPOLIS TR4 MT 058/2001 IPCA RBNI REA 4514/2014 2/3/2016 2/2/2050 1,254,330.61
  RUROPOLIS BC 13,8 kV 3,6 Mvar RUROPOLIS BC1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,044.21
  RUROPOLIS EL 13,8 kV RUROPOLIS  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  RUROPOLIS EL 13,8 kV RUROPOLIS  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,575.58
  RUROPOLIS EL 13,8 kV RUROPOLIS  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 102,597.34
  RUROPOLIS EL 13,8 kV RUROPOLIS  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  RUROPOLIS EL 13,8 kV RUROPOLIS  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,575.58
  RUROPOLIS EL 13,8 kV RUROPOLIS  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 102,597.34
  RUROPOLIS EL 138 kV RUROPOLIS  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 117,669.41
  RUROPOLIS EL 138 kV RUROPOLIS  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 92,283.77
  RUROPOLIS EL 138 kV RUROPOLIS  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 239,240.20
  RUROPOLIS EL 138 kV RUROPOLIS  DIST1 DIT   058/2001 IPCA RCDM REA 3361/2012 22/05/2017 21/05/2046 635,842.84
  RUROPOLIS EL 138 kV RUROPOLIS  DIST2 DIT   058/2001 IPCA RCDM REA 3361/2012 22/10/2015 21/10/2044 611,440.50
  RUROPOLIS EL 138 kV RUROPOLIS  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 117,669.41
  RUROPOLIS EL 138 kV RUROPOLIS  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 92,283.77
  RUROPOLIS EL 138 kV RUROPOLIS  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 239,240.20
  RUROPOLIS EL 138 kV RUROPOLIS  DIST3 DIT   058/2001 IPCA RCDM REN 443/2011 22/10/2015 21/10/2042 740,100.11
  RUROPOLIS EL 138 kV RUROPOLIS  DIST4 DIT   058/2001 IPCA RCDM REN 443/2011 22/05/2017 21/05/2044 774,057.30
  RUROPOLIS EL 230 kV RUROPOLIS LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 202,955.64
  RUROPOLIS EL 230 kV RUROPOLIS LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 157,671.96
  RUROPOLIS EL 230 kV RUROPOLIS LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 405,194.54
  RUROPOLIS EL 230 kV RUROPOLIS LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2045 643,312.46
  RUROPOLIS IB 13,8 kV MG 230 kV RUROPOLIS MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,007.87
  RUROPOLIS IB 13,8 kV MG 230 kV RUROPOLIS MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 24,318.33
  RUROPOLIS IB 13,8 kV MG 230 kV RUROPOLIS MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 63,043.81
  RUROPOLIS IB 138 kV MG 230 kV RUROPOLIS MG1 PA IB1 DIT   058/2001 IPCA RCDM REA 3361/2012 22/10/2015 21/10/2044 512,270.80
  RUROPOLIS IB 230 kV MG 230 kV RUROPOLIS MG1 PA IB1 RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 7/12/2045 671,898.99
  RUROPOLIS MC 13,8 kV BC 13,8 kV 3,6 Mvar RUROPOLIS BC1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,969.63
  RUROPOLIS MC 13,8 kV TR 230/138 kV RUROPOLIS TR3 PA RBF FT TR 230/138 kV RUROPOLIS TR3 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 7/12/2038 31,485.28
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 101,803.73
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 79,089.17
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 203,247.94
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBNI REA 3361/2012 24/10/2016 23/10/2045 557,241.37
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBNI REA 3361/2012 4/7/2016 4/6/2045 549,598.62

 

121 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 101,803.73
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 79,089.17
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 203,247.94
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR3 PA RBF FT TR 230/138 kV RUROPOLIS TR3 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 7/12/2044 685,652.29
  RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 70,590.93
  RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 181,408.66
  RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT2 PA RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT2 PA RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 70,590.93
  RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT2 PA RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 181,408.66
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 136,467.78
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 106,018.94
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 272,453.62
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBNI REA 3361/2012 24/10/2016 23/10/2045 700,254.06
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBNI REA 3361/2012 4/7/2016 4/6/2045 691,002.49
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 136,467.78
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 106,018.94
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 272,453.62
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR3 PA RBF FT TR 230/138 kV RUROPOLIS TR3 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 7/12/2044 838,481.60
  RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 7/12/2044 42,350.87
  RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBNI REN 443/2011 22/10/2015 21/10/2046 76,635.13
  RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBNI REN 443/2011 22/05/2017 21/05/2048 79,758.79
  RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 508,782.32
  RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 395,262.27
  RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,015,767.88
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,740.23
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 277,920.85
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 714,217.11
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBNI REA 4512/2014 17/03/2014 16/03/2045 12,230.11
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RMEL REN 443/2011 28/10/2016 27/10/2030 20,812.67
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT2 PA RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,740.23
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT2 PA RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 277,920.85
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT2 PA RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 714,217.11
  RUROPOLIS TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 366,799.00
  RUROPOLIS TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 284,958.42
  RUROPOLIS TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 732,302.65
  RUROPOLIS TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 366,799.00
  RUROPOLIS TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 284,958.42
  RUROPOLIS TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 732,302.65
  RUROPOLIS TR 230/138 kV RUROPOLIS TR3 PA RBF FT TR 230/138 kV RUROPOLIS TR3 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 7/12/2049 1,220,852.21
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /ARIQUEMES C-1 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-1 RO 058/2001 IPCA RBNI REA 5861/2016 19/06/2019 18/06/2034 12,744.09
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /ARIQUEMES C-1 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /ARIQUEMES C-3 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 601,335.31
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBNI REA 5861/2016 19/06/2019 18/06/2034 12,744.09
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBNI REA 5833/2016 20/10/2017 19/10/2047 150,196.99
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBNI REA 5833/2016 20/10/2017 19/10/2047 150,196.99
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBNI REA 5861/2016 19/06/2019 18/06/2034 12,744.09
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-3 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 601,335.31
  SAMUEL IB 230 kV MG 230 kV SAMUEL MG1 RO IB1 RB FT MG 230 kV SAMUEL MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  SAMUEL MG 230 kV SAMUEL MG1 RO RB FT MG 230 kV SAMUEL MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 394,461.44
  SAMUEL MG 230 kV SAMUEL MG1 RO RB FT MG 230 kV SAMUEL MG1 RO 058/2001 IPCA RMEL REN 443/2011 9/1/2016 31/08/2033 48,961.98
  SANTA MARIA BC 230 kV 55 Mvar SANTA MARIA BC1 PA RB FT BC 230 kV 55 Mvar SANTA MARIA BC1 PA 058/2001 IPCA RBNI REA 2911/2011 29/04/2014 28/04/2034 315,668.60
  SANTA MARIA BC 230 kV 55 Mvar SANTA MARIA BC2 PA RB FT BC 230 kV 55 Mvar SANTA MARIA BC2 PA 058/2001 IPCA RBNI REA 2911/2011 29/04/2014 28/04/2034 315,668.60
  SANTA MARIA EL 138 kV SANTA MARIA  DIST2 DIT   058/2001 IPCA RCDM REA 2911/2011 21/06/2017 20/06/2046 716,189.66
  SANTA MARIA EL 138 kV SANTA MARIA  MRSR-LI5-01 DIT   058/2001 IPCA RCDM REA 2911/2011 21/06/2017 20/06/2045 27,495.84
  SANTA MARIA EL 138 kV SANTA MARIA  MRSR-LI5-01 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 117,669.41
  SANTA MARIA EL 138 kV SANTA MARIA  MRSR-LI5-01 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 92,283.77
  SANTA MARIA EL 138 kV SANTA MARIA  MRSR-LI5-01 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 239,240.20
  SANTA MARIA EL 230 kV SANTA MARIA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2040 1,167.17
  SANTA MARIA EL 230 kV SANTA MARIA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  SANTA MARIA EL 230 kV SANTA MARIA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 167,801.30
  SANTA MARIA EL 230 kV SANTA MARIA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 431,225.49
  SANTA MARIA EL 69 kV SANTA MARIA  TMSR-LI4-01 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 70,005.58
  SANTA MARIA EL 69 kV SANTA MARIA  TMSR-LI4-01 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 54,902.80
  SANTA MARIA EL 69 kV SANTA MARIA  TMSR-LI4-01 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 142,332.24
  SANTA MARIA EL 69 kV SANTA MARIA  TMSR-LI4-02 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 70,005.58
  SANTA MARIA IB 138 kV MG 230 kV SANTA MARIA MG1 PA IB1 DIT   058/2001 IPCA RCDM REA 2911/2011 31/08/2016 30/08/2048 534,967.07
  SANTA MARIA IB 230 kV MG 230 kV SANTA MARIA MG1 PA IB1 RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBNI REA 2911/2011 16/12/2013 15/12/2044 153,270.72
  SANTA MARIA IB 230 kV MG 230 kV SANTA MARIA MG1 PA IB1 RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  SANTA MARIA MC 138 kV TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBNI REA 2911/2011 12/12/2016 12/11/2045 667,923.73
  SANTA MARIA MC 138 kV TR 230/138 kV SANTA MARIA TR3 PA RBF FT TR 230/138 kV SANTA MARIA TR3 PA 058/2001 IPCA RBNI REA 2911/2011 31/08/2016 30/08/2045 704,994.04
  SANTA MARIA MC 138 kV TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBNI REA 539/2006 26/09/2016 25/09/2046 128,533.27
  SANTA MARIA MC 138 kV TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 101,803.73
  SANTA MARIA MC 230 kV BC 230 kV 55 Mvar SANTA MARIA BC1 PA RB FT BC 230 kV 55 Mvar SANTA MARIA BC1 PA 058/2001 IPCA RBNI REA 2911/2011 29/04/2014 28/04/2044 858,745.05
  SANTA MARIA MC 230 kV BC 230 kV 55 Mvar SANTA MARIA BC2 PA RB FT BC 230 kV 55 Mvar SANTA MARIA BC2 PA 058/2001 IPCA RBNI REA 2911/2011 29/04/2014 28/04/2044 859,434.81
  SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBNI REA 2911/2011 12/12/2016 12/11/2044 94,603.10
  SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 118,106.27
  SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 303,516.33
  SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TR3 PA RBF FT TR 230/138 kV SANTA MARIA TR3 PA 058/2001 IPCA RBNI REA 2911/2011 31/08/2016 30/08/2045 861,548.88
  SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBNI REA 2911/2011 26/09/2016 25/09/2044 94,789.51
  SANTA MARIA MC 230 kV TR 230/69 kV SANTA MARIA TF1 PA RBF FT TR 230/69 kV SANTA MARIA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  SANTA MARIA MC 230 kV TR 230/69 kV SANTA MARIA TF1 PA RBF FT TR 230/69 kV SANTA MARIA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 118,106.27
  SANTA MARIA MC 230 kV TR 230/69 kV SANTA MARIA TF1 PA RBF FT TR 230/69 kV SANTA MARIA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 303,516.33
  SANTA MARIA MC 230 kV TR 230/69 kV SANTA MARIA TF2 PA RBF FT TR 230/69 kV SANTA MARIA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 525,066.40
  SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 407,913.02
  SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,048,278.52
  SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBNI REA 2911/2011 31/08/2016 30/08/2045 501,480.94
  SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBNI REA 2911/2011 31/08/2016 30/08/2044 263,917.20
  SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBNI REA 2911/2011 29/04/2014 28/04/2039 446,046.17
  SANTA MARIA TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 366,799.00
  SANTA MARIA TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 284,958.42
  SANTA MARIA TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 732,302.65
  SANTA MARIA TR 230/138 kV SANTA MARIA TR3 PA RBF FT TR 230/138 kV SANTA MARIA TR3 PA 058/2001 IPCA RBNI REA 2911/2011 31/08/2016 30/08/2050 1,251,538.82
  SANTA MARIA TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 366,799.00
  SANTA MARIA TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 284,958.42
  SANTA MARIA TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 732,302.65
  SANTA MARIA TR 230/69 kV SANTA MARIA TF1 PA RBF FT TR 230/69 kV SANTA MARIA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,875.23
  SANTA MARIA TR 230/69 kV SANTA MARIA TF1 PA RBF FT TR 230/69 kV SANTA MARIA TF1 PA 058/2001 IPCA RMEL REN 443/2011 20/06/2017 19/06/2040 18,144.03
  SANTA MARIA TR 230/69 kV SANTA MARIA TF2 PA RBF FT TR 230/69 kV SANTA MARIA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,875.23
  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81
  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81
  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81
  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81
  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81
  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81

 

122 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST7 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81
  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST8 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81
  SAO LUIS I EL 230 kV SAO LUIS I LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RMEL REN 443/2011 24/09/2017 23/09/2040 17,532.99
  SAO LUIS I EL 230 kV SAO LUIS I LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  SAO LUIS I EL 230 kV SAO LUIS I LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  SAO LUIS I EL 230 kV SAO LUIS I LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 173,588.35
  SAO LUIS I EL 230 kV SAO LUIS I LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RMEL REN 443/2011 17/09/2017 16/09/2040 17,522.09
  SAO LUIS I EL 69 kV SAO LUIS I  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  SAO LUIS I EL 69 kV SAO LUIS I  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  SAO LUIS I EL 69 kV SAO LUIS I  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,064.38
  SAO LUIS I EL 69 kV SAO LUIS I  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 150,528.45
  SAO LUIS I EL 69 kV SAO LUIS I  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  SAO LUIS I EL 69 kV SAO LUIS I  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  SAO LUIS I EL 69 kV SAO LUIS I  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  SAO LUIS I EL 69 kV SAO LUIS I  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  SAO LUIS I EL 69 kV SAO LUIS I  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,064.38
  SAO LUIS I EL 69 kV SAO LUIS I  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 150,528.45
  SAO LUIS I EL 69 kV SAO LUIS I  DIST7 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  SAO LUIS I EL 69 kV SAO LUIS I  DIST8 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  SAO LUIS I EL 69 kV SAO LUIS I  MARACANA 2 DIT   007/2008 IPCA RCDM REN 443/2011 29/06/2017 28/06/2040 297,975.95
  SAO LUIS I IB 13,8 kV MG 230 kV SAO LUIS I MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,007.87
  SAO LUIS I IB 230 kV MG 230 kV SAO LUIS I MG1 MA IB1 RB FT MG 230 kV SAO LUIS I MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  SAO LUIS I IB 69 kV MG 230 kV SAO LUIS I MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,564.67
  SAO LUIS I IB 69 kV MG 230 kV SAO LUIS I MG1 MA IB2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,564.67
  SAO LUIS I IB 69 kV MG 230 kV SAO LUIS I MG1 MA IB3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,564.67
  SAO LUIS I MC 13,8 kV TR 69/13,8 kV SAO LUIS I TR1 MA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 48,968.56
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 124,464.90
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 319,857.11
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 124,464.90
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 319,857.11
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 48,177.12
  SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 123,808.35
  SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  SAO LUIS I MC 69 kV TR 69/13,8 kV SAO LUIS I TR1 MA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 63,329.55
  SAO LUIS I MG 230 kV SAO LUIS I MG1 MA RB FT MG 230 kV SAO LUIS I MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 591,794.69
  SAO LUIS I MG 230 kV SAO LUIS I MG1 MA RB FT MG 230 kV SAO LUIS I MG1 MA 058/2001 IPCA RBNI REN 443/2011 29/06/2017 28/06/2045 48,157.31
  SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RMEL REN 443/2011 5/7/2017 5/6/2031 23,670.98
  SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RMEL REN 443/2011 23/07/2017 22/07/2040 17,434.82
  SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RMEL REN 443/2011 23/07/2017 22/07/2040 5,534.61
  SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 271,502.61
  SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 697,723.14
  SAO LUIS I TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  SAO LUIS I TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RMEL REN 443/2011 29/05/2017 28/05/2031 23,738.46
  SAO LUIS I TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RMEL REN 443/2011 30/07/2017 29/07/2040 17,664.09
  SAO LUIS I TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RMEL REN 443/2011 6/11/2017 6/10/2031 23,833.15
  SAO LUIS I TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2040 17,293.02
  SAO LUIS I TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  SAO LUIS I TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 271,502.61
  SAO LUIS I TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 349,478.67
  SAO LUIS I TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 271,502.61
  SAO LUIS I TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 697,723.14
  SAO LUIS I TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RMEL REN 443/2011 18/06/2017 17/06/2040 17,380.29
  SAO LUIS I TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RMEL REN 443/2011 18/06/2017 17/06/2040 5,517.30
  SAO LUIS I TR 69/13,8 kV SAO LUIS I TR1 MA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 118,165.94
  SAO LUIS II BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA RB FT BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 190,028.59
  SAO LUIS II BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA RB FT BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 147,629.20
  SAO LUIS II BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA RB FT BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 379,386.09
  SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,151.21
  SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 153,162.62
  SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 393,606.18
  SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,151.21
  SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 153,162.62
  SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 393,606.18
  SAO LUIS II BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 204,888.99
  SAO LUIS II BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 159,173.94
  SAO LUIS II BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 409,054.41
  SAO LUIS II CE 150/-100 MvAr SAO LUIS II CE1 MA RB FT CE 150/-100 MvAr SAO LUIS II CE1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,116,294.45
  SAO LUIS II CE 150/-100 Mvar SAO LUIS II CE2 MA RB FT CE 150/-100 Mvar SAO LUIS II CE2 MA 058/2001 IPCA RBNI REA 2270/2010 16/12/2013 15/12/2043 7,926,680.11
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /MIRANDA II C-1 MA RB FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RMEL REN 443/2011 8/6/2017 8/5/2040 17,456.64
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RMEL REN 443/2011 12/3/2017 12/2/2040 5,880.69
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 173,588.35
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 278,113.70
  SAO LUIS II EL 500 kV SAO LUIS II LT 500 kV SAO LUIS II /BACABEIRA C-1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  SAO LUIS II EL 500 kV SAO LUIS II LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RMEL REN 443/2011 2/5/2017 2/4/2040 23,807.92
  SAO LUIS II EL 500 kV SAO LUIS II LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  SAO LUIS II EL 500 kV SAO LUIS II LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,896.56
  SAO LUIS II IB 230 kV MG 500 kV SAO LUIS II MG1 MA IB1 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  SAO LUIS II IB 230 kV MG 500 kV SAO LUIS II MG1 MA IB2 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB1 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB1 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB2 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB2 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB3 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB3 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB3 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 868,670.25
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB4 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2045 1,149,241.19
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB4 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBNIA REA 7814/2019     189,105.61
  SAO LUIS II MC 230 kV BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA RB FT BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 164,940.98
  SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 164,940.98
  SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 128,139.17
  SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 329,299.48
  SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 164,940.98
  SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 128,139.17
  SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 329,299.48
  SAO LUIS II MC 230 kV BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 164,940.98
  SAO LUIS II MC 230 kV BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 128,139.17
  SAO LUIS II MC 230 kV BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 329,299.48
  SAO LUIS II MC 230 kV CE 150/-100 MvAr SAO LUIS II CE1 MA RB FT CE 150/-100 MvAr SAO LUIS II CE1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 149,558.09
  SAO LUIS II MC 230 kV CE 150/-100 Mvar SAO LUIS II CE2 MA RB FT CE 150/-100 Mvar SAO LUIS II CE2 MA 058/2001 IPCA RBNI REA 2270/2010 16/12/2013 15/12/2044 798,244.45

 

123 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  SAO LUIS II MC 230 kV TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  SAO LUIS II MC 230 kV TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  SAO LUIS II MC 230 kV TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  SAO LUIS II MC 230 kV TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 124,464.90
  SAO LUIS II MC 230 kV TR 500/230 kV SAO LUIS II TR4 MA RB FT TR 500/230 kV SAO LUIS II TR4 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2045 898,704.79
  SAO LUIS II MC 500 kV RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 351,205.79
  SAO LUIS II MC 500 kV RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 272,844.38
  SAO LUIS II MC 500 kV RTB 500 kV 45,33 Mvar SAO LUIS II RT4 MA RB FT RTB 500 kV 45,33 Mvar SAO LUIS II RT4 MA 058/2001 IPCA RBNIA REA 7814/2019     1,428,613.03
  SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,005.44
  SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,005.44
  SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 318,524.58
  SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,005.44
  SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 318,524.58
  SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 818,562.93
  SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR4 MA RB FT TR 500/230 kV SAO LUIS II TR4 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2045 1,392,153.45
  SAO LUIS II MC 69 kV RTN 69 kV 0 Mvar SAO LUIS II RN1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,271.34
  SAO LUIS II MC 69 kV RTN 69 kV 0 Mvar SAO LUIS II RN2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,271.34
  SAO LUIS II MG 500 kV SAO LUIS II MG1 MA RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBNI REA 2270/2010 16/12/2013 15/12/2040 1,122,546.84
  SAO LUIS II MG 500 kV SAO LUIS II MG1 MA RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2042 578,232.93
  SAO LUIS II MG 500 kV SAO LUIS II MG1 MA RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,667,547.07
  SAO LUIS II MG 500 kV SAO LUIS II MG1 MA RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBNIA REA 7814/2019     389,819.16
  SAO LUIS II RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 742,354.66
  SAO LUIS II RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 576,719.69
  SAO LUIS II RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,482,087.68
  SAO LUIS II RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RMEL REN 443/2011 26/04/2017 25/04/2031 35,719.81
  SAO LUIS II RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RMEL REN 443/2011 6/9/2017 6/8/2040 24,075.80
  SAO LUIS II RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA RB FT RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 247,451.55
  SAO LUIS II RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA RB FT RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 192,239.90
  SAO LUIS II RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA RB FT RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 494,029.23
  SAO LUIS II RTB 500 kV 45,33 Mvar SAO LUIS II RT4 MA RB FT RTB 500 kV 45,33 Mvar SAO LUIS II RT4 MA 058/2001 IPCA RBNIA REA 7814/2019     1,691,761.63
  SAO LUIS II RTL 500 kV 100 Mvar SAO LUIS II RT1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 667,045.60
  SAO LUIS II RTL 500 kV 100 Mvar SAO LUIS II RT1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 518,213.67
  SAO LUIS II RTL 500 kV 100 Mvar SAO LUIS II RT1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,331,735.52
  SAO LUIS II RTL 500 kV 100 MVAr SAO LUIS II RT2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 667,045.60
  SAO LUIS II RTL 500 kV 100 MVAr SAO LUIS II RT2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 518,213.67
  SAO LUIS II RTL 500 kV 100 MVAr SAO LUIS II RT2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,331,735.52
  SAO LUIS II RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA RB FT RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,267.53
  SAO LUIS II RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA RB FT RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 172,674.96
  SAO LUIS II RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA RB FT RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 443,750.12
  SAO LUIS II RTN 69 kV 0 Mvar SAO LUIS II RN1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  SAO LUIS II RTN 69 kV 0 Mvar SAO LUIS II RN2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  SAO LUIS II TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RMEL REN 443/2011 7/6/2017 7/5/2040 17,408.33
  SAO LUIS II TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,847,135.86
  SAO LUIS II TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,435,000.92
  SAO LUIS II TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,687,748.54
  SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,847,135.86
  SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,435,000.92
  SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,687,748.54
  SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RMEL REN 443/2011 27/07/2017 26/07/2047 71,005.67
  SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RMEL REN 443/2011 27/07/2017 26/07/2051 28,707.25
  SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RMEL REN 443/2011 20/10/2017 19/10/2042 5,378.73
  SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RMEL REN 443/2011 7/7/2017 7/6/2040 17,409.89
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051 108,420.98
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051 108,420.98
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2047 101,434.28
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2040 36,771.51
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2047 9,933.77
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051 27,639.41
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051 22,636.18
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051 22,636.18
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051 22,636.18
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051 22,636.18
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,435,000.92
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,687,748.54
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,847,135.86
  SAO LUIS II TR 500/230 kV SAO LUIS II TR4 MA RB FT TR 500/230 kV SAO LUIS II TR4 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2048 4,206,031.68
  SAO LUIS II TR 500/230 kV SAO LUIS II TRR1 MA RB FT TR 500/230 kV SAO LUIS II TRR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 615,711.95
  SAO LUIS II TR 500/230 kV SAO LUIS II TRR1 MA RB FT TR 500/230 kV SAO LUIS II TRR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 478,333.64
  SAO LUIS II TR 500/230 kV SAO LUIS II TRR1 MA RB FT TR 500/230 kV SAO LUIS II TRR1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,229,249.51
  SAO LUIS III EL 230 kV SAO LUIS III LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 278,113.70
  SAO LUIS III EL 69 kV SAO LUIS III  ARACARY DIT   007/2008 IPCA RCDM REN 443/2011 29/06/2017 28/06/2040 297,975.95
  SAO LUIS III EL 69 kV SAO LUIS III  DIST1 DIT   007/2008 IPCA RCDM REA 1581/2008 9/3/2010 9/3/2041 321,280.48
  SAO LUIS III EL 69 kV SAO LUIS III  DIST2 DIT   007/2008 IPCA RCDM REA 1581/2008 9/3/2010 9/3/2041 321,280.48
  SAO LUIS III EL 69 kV SAO LUIS III  DIST3 DIT   007/2008 IPCA RCDM REA 1581/2008 9/3/2010 9/3/2041 321,280.48
  SAO LUIS III EL 69 kV SAO LUIS III  OLHOS DAGUA DIT   007/2008 IPCA RCDM REN 443/2011 29/06/2017 28/06/2040 297,975.95
  SAO LUIS III IB 230 kV MG 230 kV SAO LUIS III MG1 MA IB1 RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 138,634.53
  SAO LUIS III IB 69 kV MG 230 kV SAO LUIS III MG1 MA IB1 DIT   007/2008 IPCA RPEC CC 007/2008 8/10/2010 17/03/2038 32,018.41
  SAO LUIS III MC 13,8 kV TR 230/69 kV SAO LUIS III TR2 MA RBF FT TR 230/69 kV SAO LUIS III TR2 MA 007/2008 IPCA RBNI REA 2911/2011 6/1/2013 6/1/2048 1,474.15
  SAO LUIS III MC 230 kV TR 230/69 kV SAO LUIS III TR1 MA RBF FT TR 230/69 kV SAO LUIS III TR1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 243,166.91
  SAO LUIS III MC 230 kV TR 230/69 kV SAO LUIS III TR2 MA RBF FT TR 230/69 kV SAO LUIS III TR2 MA 007/2008 IPCA RBNI REA 2911/2011 6/1/2013 6/1/2047 721,066.80
  SAO LUIS III MC 230 kV TR 230/69 kV SAO LUIS III TR3 MA RBF FT TR 230/69 kV SAO LUIS III TR3 MA 007/2008 IPCA RBNIA REA 8348/2019     647,616.97
  SAO LUIS III MC 69 kV TR 230/69 kV SAO LUIS III TR1 MA RBF FT TR 230/69 kV SAO LUIS III TR1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 65,273.68
  SAO LUIS III MC 69 kV TR 230/69 kV SAO LUIS III TR2 MA RBF FT TR 230/69 kV SAO LUIS III TR2 MA 007/2008 IPCA RBNI REA 2911/2011 6/1/2013 6/1/2047 297,694.08
  SAO LUIS III MC 69 kV TR 230/69 kV SAO LUIS III TR3 MA RBF FT TR 230/69 kV SAO LUIS III TR3 MA 007/2008 IPCA RBNIA REA 8348/2019     244,906.94
  SAO LUIS III MC 69 kV TT 69/0 kV SAO LUIS III TT1 MA DIT   007/2008 IPCA RCDM REA 1581/2008 9/3/2010 9/2/2030 119,728.37
  SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 732,256.34
  SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REA 2911/2011 6/1/2013 6/1/2045 178,255.11
  SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REN 443/2011 29/06/2017 28/06/2048 35,244.97
  SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REN 443/2011 29/06/2017 28/06/2048 35,244.97
  SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REA 1581/2008 9/3/2010 9/3/2038 78,370.49
  SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNIA REA 8348/2019     114,135.21
  SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNIA REA 8348/2019     31,976.69
  SAO LUIS III TR 230/69 kV SAO LUIS III TR1 MA RBF FT TR 230/69 kV SAO LUIS III TR1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 557,797.70
  SAO LUIS III TR 230/69 kV SAO LUIS III TR2 MA RBF FT TR 230/69 kV SAO LUIS III TR2 MA 007/2008 IPCA RBNI REA 2911/2011 6/1/2013 6/1/2053 1,440,967.46
  SAO LUIS III TR 230/69 kV SAO LUIS III TR2 MA RBF FT TR 230/69 kV SAO LUIS III TR2 MA 007/2008 IPCA RMEL REN 443/2011 22/10/2017 21/10/2047 86.28
  SAO LUIS III TR 230/69 kV SAO LUIS III TR3 MA RBF FT TR 230/69 kV SAO LUIS III TR3 MA 007/2008 IPCA RBNIA REA 8348/2019     1,105,661.97
  SAO LUIS III TT 69/0 kV SAO LUIS III TT1 MA DIT   007/2008 IPCA RCDM REA 1581/2008 9/3/2010 9/3/2041 285,959.29
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,044.21
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC2 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,044.21
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC3 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,044.21
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC4 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,044.21
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC5 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,044.21
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC6 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,044.21
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC7 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,044.21
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC8 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,044.21
  SINOP BC 230 kV 30 MVAr SINOP BC1 MT RB FT BC 230 kV 30 MVAr SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 147,632.60
  SINOP CE 55/-20 Mvar SINOP CE1 MT RB FT CE 55/-20 Mvar SINOP CE1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,517,792.46
  SINOP EL 138 kV SINOP  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 117,669.41
  SINOP EL 138 kV SINOP  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 92,283.77
  SINOP EL 138 kV SINOP  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 239,240.20

 

124 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  SINOP EL 230 kV SINOP LT 230 kV SINOP /SORRISO C-1 MT RB FT LT 230 kV SINOP /SORRISO C-1 MT 058/2001 IPCA RBNI REA 7814/2019 9/8/2020 9/8/2051 117,466.66
  SINOP EL 230 kV SINOP LT 230 kV SINOP /SORRISO C-1 MT RB FT LT 230 kV SINOP /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  SINOP EL 230 kV SINOP LT 230 kV SINOP /SORRISO C-1 MT RB FT LT 230 kV SINOP /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 167,801.30
  SINOP EL 230 kV SINOP LT 230 kV SINOP /SORRISO C-1 MT RB FT LT 230 kV SINOP /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 431,225.49
  SINOP IB 138 kV MG 230 kV SINOP MG1 MT IB1 DIT   058/2001 IPCA RCDM REA 3102/2011 16/09/2013 15/09/2044 475,229.87
  SINOP IB 230 kV MG 230 kV SINOP MG1 MT IB1 RB FT MG 230 kV SINOP MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,969.63
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC2 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 61,570.18
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC3 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 61,570.18
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC4 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 61,570.18
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC5 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,969.63
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC6 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 61,570.18
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC7 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 61,570.18
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC8 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 61,570.18
  SINOP MC 13,8 kV TR 230/138 kV SINOP TR1 MT TERC RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,413.61
  SINOP MC 13,8 kV TR 230/138 kV SINOP TR1 MT TERC RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 38,388.39
  SINOP MC 13,8 kV TR 230/138 kV SINOP TR1 MT TERC RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 98,652.72
  SINOP MC 138 kV TR 230/138 kV SINOP TR1 MT RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 101,803.73
  SINOP MC 138 kV TR 230/138 kV SINOP TR1 MT RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBNI REA 3102/2011 16/09/2013 15/09/2047 64,555.37
  SINOP MC 138 kV TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBNI REA 3102/2011 16/09/2013 15/09/2047 64,555.37
  SINOP MC 138 kV TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 101,803.73
  SINOP MC 138 kV TR 230/138 kV SINOP TR3 MT RBF FT TR 230/138 kV SINOP TR3 MT 058/2001 IPCA RBNI REA 3102/2011 16/09/2013 15/09/2043 622,594.77
  SINOP MC 230 kV BC 230 kV 30 MVAr SINOP BC1 MT RB FT BC 230 kV 30 MVAr SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,390.09
  SINOP MC 230 kV CE 55/-20 Mvar SINOP CE1 MT RB FT CE 55/-20 Mvar SINOP CE1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 154,799.96
  SINOP MC 230 kV RTL 230 kV 20 MVAr SINOP RT2 MT RB FT LT 230 kV SINOP /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  SINOP MC 230 kV RTL 230 kV 22,14 Mvar SINOP RT1 MT RB FT LT 230 kV SINOP /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  SINOP MC 230 kV TR 230/138 kV SINOP TR1 MT RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  SINOP MC 230 kV TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  SINOP MC 230 kV TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 118,106.27
  SINOP MC 230 kV TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 303,516.33
  SINOP MC 230 kV TR 230/138 kV SINOP TR3 MT RBF FT TR 230/138 kV SINOP TR3 MT 058/2001 IPCA RBNI REA 3102/2011 16/09/2013 15/09/2042 804,122.62
  SINOP MG 230 kV SINOP MG1 MT RB FT MG 230 kV SINOP MG1 MT 058/2001 IPCA RBNI REA 7814/2019 9/8/2020 9/8/2052 62.08
  SINOP MG 230 kV SINOP MG1 MT RB FT MG 230 kV SINOP MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 496,865.62
  SINOP MG 230 kV SINOP MG1 MT RB FT MG 230 kV SINOP MG1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 386,004.43
  SINOP MG 230 kV SINOP MG1 MT RB FT MG 230 kV SINOP MG1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 991,976.55
  SINOP RTL 230 kV 20 MVAr SINOP RT2 MT RB FT LT 230 kV SINOP /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,506.77
  SINOP RTL 230 kV 20 MVAr SINOP RT2 MT RB FT LT 230 kV SINOP /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 221,804.19
  SINOP RTL 230 kV 20 MVAr SINOP RT2 MT RB FT LT 230 kV SINOP /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 570,005.26
  SINOP RTL 230 kV 22,14 Mvar SINOP RT1 MT RB FT LT 230 kV SINOP /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 303,616.33
  SINOP TR 230/138 kV SINOP TR1 MT RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 366,799.00
  SINOP TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 366,799.00
  SINOP TR 230/138 kV SINOP TR3 MT RBF FT TR 230/138 kV SINOP TR3 MT 058/2001 IPCA RBNI REA 3102/2011 16/09/2013 15/09/2047 1,188,587.66
  SORRISO BC 13,8 kV 3,6 MVAr SORRISO BC1 MT RBF FT BC 13,8 kV 3,6 MVAr SORRISO BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 29,419.95
  SORRISO BC 13,8 kV 3,6 MVAr SORRISO BC2 MT RBF FT BC 13,8 kV 3,6 MVAr SORRISO BC2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 29,419.95
  SORRISO EL 13,8 kV SORRISO  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  SORRISO EL 230 kV SORRISO LT 230 kV NOVA MUTUM /SORRISO C-1 MT RB FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  SORRISO EL 230 kV SORRISO LT 230 kV SINOP /SORRISO C-1 MT RB FT LT 230 kV SINOP /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  SORRISO EL 69 kV SORRISO  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  SORRISO EL 69 kV SORRISO  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,064.38
  SORRISO EL 69 kV SORRISO  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 150,528.45
  SORRISO IB 230 kV MG 230 kV SORRISO MG1 MT IB1 RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  SORRISO IB 69 kV MG 230 kV SORRISO MG1 MT IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,564.67
  SORRISO MC 13,8 kV BC 13,8 kV 3,6 MVAr SORRISO BC1 MT RBF FT BC 13,8 kV 3,6 MVAr SORRISO BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,453.45
  SORRISO MC 13,8 kV BC 13,8 kV 3,6 MVAr SORRISO BC2 MT RBF FT BC 13,8 kV 3,6 MVAr SORRISO BC2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,453.45
  SORRISO MC 230 kV TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  SORRISO MC 230 kV TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 118,106.27
  SORRISO MC 230 kV TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 303,516.33
  SORRISO MC 230 kV TR 230/69 kV SORRISO TF2 MT RBF FT TR 230/69 kV SORRISO TF2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  SORRISO MC 230 kV TR 230/69 kV SORRISO TF3 MT RBF FT TR 230/69 kV SORRISO TF3 MT 058/2001 IPCA RBNI REA 5713/2016 18/12/2017 17/12/2046 900,282.64
  SORRISO MC 69 kV TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  SORRISO MC 69 kV TR 230/69 kV SORRISO TF2 MT RBF FT TR 230/69 kV SORRISO TF2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  SORRISO MC 69 kV TR 230/69 kV SORRISO TF3 MT RBF FT TR 230/69 kV SORRISO TF3 MT 058/2001 IPCA RBNI REA 5713/2016 18/12/2017 17/12/2047 378,355.30
  SORRISO MG 230 kV SORRISO MG1 MT RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBNI REA 5713/2016 18/12/2017 17/12/2044 235,280.35
  SORRISO MG 230 kV SORRISO MG1 MT RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBNI REA 5713/2016 18/12/2017 17/12/2042 445,279.40
  SORRISO MG 230 kV SORRISO MG1 MT RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 459,065.07
  SORRISO MG 230 kV SORRISO MG1 MT RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 356,637.98
  SORRISO MG 230 kV SORRISO MG1 MT RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 916,508.94
  SORRISO TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,170.03
  SORRISO TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 129,870.88
  SORRISO TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 333,749.70
  SORRISO TR 230/69 kV SORRISO TF2 MT RBF FT TR 230/69 kV SORRISO TF2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,170.03
  SORRISO TR 230/69 kV SORRISO TF3 MT RBF FT TR 230/69 kV SORRISO TF3 MT 058/2001 IPCA RBNI REA 5713/2016 18/12/2017 17/12/2051 895,970.29
  SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS1 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 903,586.21
  SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS1 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 701,977.09
  SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS1 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS1 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,803,981.40
  SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS2 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 903,586.21
  SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS2 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 701,977.09
  SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS2 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS2 MA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,803,981.40
  SUB S.LUIS MC 13,8 kV CS 33/-31 MVAr SUB S.LUIS CS1 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 59,739.15
  SUB S.LUIS MC 13,8 kV CS 33/-31 MVAr SUB S.LUIS CS2 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 59,739.15
  TRANSAMAZONIC EL 230 kV TRANSAMAZONIC LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2044 1,281,452.85
  TRANSAMAZONIC EL 230 kV TRANSAMAZONIC LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2045 1,276,525.91
  TRANSAMAZONIC EL 34 kV TRANSAMAZONIC  CELPA DIT   058/2001 IPCA RCDM REA 4660/2014 29/08/2016 28/08/2046 320,326.13
  TRANSAMAZONIC EL 34,5 kV TRANSAMAZONIC  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 70,005.58
  TRANSAMAZONIC EL 34,5 kV TRANSAMAZONIC  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 54,902.80
  TRANSAMAZONIC EL 34,5 kV TRANSAMAZONIC  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 142,332.24
  TRANSAMAZONIC IB 230 kV MG 230 kV TRANSAMAZONIC MG1 PA IB1 RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2051 752,027.70
  TRANSAMAZONIC IB 34 kV MG 230 kV TRANSAMAZONIC MG1 PA IB1 DIT   058/2001 IPCA RCDM REA 4660/2014 29/08/2016 28/08/2047 236,419.58
  TRANSAMAZONIC MC 230 kV RTL 230 kV 30 Mvar TRANSAMAZONIC RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2047 21,649.91
  TRANSAMAZONIC MC 230 kV RTL 230 kV 30 Mvar TRANSAMAZONIC RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  TRANSAMAZONIC MC 230 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 202,955.64
  TRANSAMAZONIC MC 230 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBNI REA 4660/2014 18/11/2016 17/11/2045 1,017,594.81
  TRANSAMAZONIC MC 230 kV TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2046 1,331,527.45
  TRANSAMAZONIC MC 230 kV TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 136,467.78
  TRANSAMAZONIC MC 34 kV TT 34/34 kV TRANSAMAZONIC TA2 PA DIT   058/2001 IPCA RCDM REA 4660/2014 29/08/2016 28/08/2044 230,483.61
  TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 43,154.33
  TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 110,900.49
  TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBNI REA 4660/2014 18/11/2016 17/11/2045 285,573.64
  TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2042 286,838.21
  TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 399,950.23
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 310,712.91
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 798,488.04
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 210,645.65
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2044 275,971.57
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 144,082.16
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 241,164.10
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 241,164.10
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 26,750.77

 

125 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 26,750.77
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 2,700,850.91
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 539,270.36
  TRANSAMAZONIC RTL 230 kV 30 Mvar TRANSAMAZONIC RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,740.23
  TRANSAMAZONIC RTL 230 kV 30 Mvar TRANSAMAZONIC RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 277,920.85
  TRANSAMAZONIC RTL 230 kV 30 Mvar TRANSAMAZONIC RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 714,217.11
  TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,170.03
  TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 129,870.88
  TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 333,749.70
  TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBNI REA 4660/2014 18/11/2016 17/11/2041 138,357.90
  TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2041 136,747.55
  TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,170.03
  TRANSAMAZONIC TT 34/34 kV TRANSAMAZONIC TA2 PA DIT   058/2001 IPCA RCDM REA 4660/2014 29/08/2016 28/08/2046 189,682.14
  TUCURUI EL 13,8 kV TUCURUI  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81
  TUCURUI EL 13,8 kV TUCURUI  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81
  TUCURUI EL 13,8 kV TUCURUI  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81
  TUCURUI EL 13,8 kV TUCURUI  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81
  TUCURUI EL 13,8 kV TUCURUI  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81
  TUCURUI EL 13,8 kV TUCURUI  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81
  TUCURUI EL 13,8 kV TUCURUI  DIST7 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81
  TUCURUI EL 13,8 kV TUCURUI  DIST8 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,116.81
  TUCURUI EL 138 kV TUCURUI  DIST1 DIT   012/2011 IPCA RPEC CC 012/2011 26/12/2014 12/9/2041 559,111.49
  TUCURUI EL 230 kV TUCURUI  DIST1 DIT   058/2001 IPCA RCDM REA 3216/2011 24/05/2015 23/05/2045 955,249.71
  TUCURUI EL 230 kV TUCURUI  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 207,262.17
  TUCURUI EL 230 kV TUCURUI  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 162,548.07
  TUCURUI EL 230 kV TUCURUI LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBNI REA 3216/2011 7/2/2015 7/1/2045 957,964.31
  TUCURUI EL 230 kV TUCURUI LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 202,955.64
  TUCURUI EL 230 kV TUCURUI LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 157,671.96
  TUCURUI EL 230 kV TUCURUI LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 405,194.54
  TUCURUI EL 500 kV TUCURUI LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  TUCURUI EL 500 kV TUCURUI LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,413.73
  TUCURUI EL 500 kV TUCURUI LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,413.73
  TUCURUI EL 500 kV TUCURUI LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  TUCURUI EL 500 kV TUCURUI LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 360,896.56
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 474,403.96
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-10 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 474,403.96
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-10 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 372,057.52
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-10 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 964,537.01
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-11 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 474,403.96
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-11 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 372,057.52
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-11 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 964,537.01
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-2 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 474,403.96
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-2 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 372,057.52
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-3 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 474,403.96
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-3 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 372,057.52
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-4 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 474,403.96
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-4 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 372,057.52
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-5 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 474,403.96
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-6 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 474,403.96
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-7 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 474,403.96
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-8 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 474,403.96
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-9 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 474,403.96
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  TUCURUI EL 69 kV TUCURUI  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  TUCURUI EL 69 kV TUCURUI  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,064.38
  TUCURUI EL 69 kV TUCURUI  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 150,528.45
  TUCURUI EL 69 kV TUCURUI LT 69 kV US. TUCURUI /TUCURUI C-1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  TUCURUI EL 69 kV TUCURUI LT 69 kV US. TUCURUI /TUCURUI C-2 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,036.86
  TUCURUI IB 13,8 kV MG 500 kV TUCURUI MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,007.87
  TUCURUI IB 138 kV MG 230 kV TUCURUI MG1 PA IB1 DIT   012/2011 IPCA RPEC CC 012/2011 26/12/2014 12/9/2041 294,025.73
  TUCURUI IB 230 kV MG 500 kV TUCURUI MG1 PA IB1 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 3216/2011 2/9/2015 2/8/2046 675,455.98
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB1 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB2 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB3 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB3 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB4 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB4 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB4 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 868,670.25
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB4 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 3216/2011 22/02/2016 21/02/2046 167,423.66
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB5 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB5 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB5 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 868,670.25
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB6 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB6 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB6 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 868,670.25
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB6 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 3216/2011 22/02/2016 21/02/2046 167,423.66
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB7 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB9 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  TUCURUI IB 69 kV MG 500 kV TUCURUI MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,564.67
  TUCURUI MC 138 kV TR 230/138 kV TUCURUI TR1 PA RBF FT TR 230/138 kV TUCURUI TR1 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 12/9/2041 111,331.68
  TUCURUI MC 138 kV TR 230/138 kV TUCURUI TR2 PA RBF FT TR 230/138 kV TUCURUI TR2 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 12/9/2041 111,331.68
  TUCURUI MC 230 kV TR 230/138 kV TUCURUI TR1 PA RBF FT TR 230/138 kV TUCURUI TR1 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 12/9/2041 147,337.12
  TUCURUI MC 230 kV TR 230/138 kV TUCURUI TR2 PA RBF FT TR 230/138 kV TUCURUI TR2 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 12/9/2041 147,337.12
  TUCURUI MC 230 kV TR 230/69 kV TUCURUI TF1 PA RBF FT TR 230/69 kV TUCURUI TF1 PA 058/2001 IPCA RBNI REA 3216/2011 2/9/2015 2/8/2046 850,439.49
  TUCURUI MC 230 kV TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBNI REA 3216/2011 22/02/2016 21/02/2047 2,471,398.50
  TUCURUI MC 230 kV TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,775.24
  TUCURUI MC 230 kV TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 112,472.84
  TUCURUI MC 230 kV TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 289,039.21
  TUCURUI MC 230 kV TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR2 PA 058/2001 IPCA RBNI REA 3216/2011 2/9/2015 2/8/2046 1,954,944.51
  TUCURUI MC 500 kV RTB 500 kV 50 Mvar TUCURUI RT1 PA MC1 RB FT RTB 500 kV 50 Mvar TUCURUI RT1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,399.31
  TUCURUI MC 500 kV RTB 500 kV 50 Mvar TUCURUI RT1 PA MC2 RB FT RTB 500 kV 50 Mvar TUCURUI RT1 PA 058/2001 IPCA RBNI REA 4745/2014 22/02/2016 21/02/2048 1,023,232.16
  TUCURUI MC 500 kV TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR2 PA 058/2001 IPCA RBNI REA 3216/2011 22/02/2016 21/02/2046 1,168,139.86
  TUCURUI MC 500 kV TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBNI REA 3216/2011 2/9/2015 2/8/2046 811,513.34
  TUCURUI MC 500 kV TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,005.44
  TUCURUI MC 500 kV TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 318,524.58
  TUCURUI MC 500 kV TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 818,562.93
  TUCURUI MC 69 kV TR 230/69 kV TUCURUI TF1 PA RBF FT TR 230/69 kV TUCURUI TF1 PA 058/2001 IPCA RBNI REA 3216/2011 2/9/2015 2/8/2046 361,810.64
  TUCURUI MC 69 kV TR 500/69 kV TUCURUI TF1 PA RBF FT TR 500/69 kV TUCURUI TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,013.67
  TUCURUI MG 230 kV TUCURUI MG1 PA RB FT MG 230 kV TUCURUI MG1 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 12/9/2041 282,280.26
  TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 3216/2011 22/02/2016 21/02/2045 10,945,296.20
  TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 4745/2014 22/02/2016 21/02/2045 554,735.87
  TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 4745/2014 22/02/2016 21/02/2045 638,420.84
  TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 4745/2014 22/02/2016 21/02/2041 3,734.17
  TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,278,658.07
  TUCURUI RTB 500 kV 50 Mvar TUCURUI RT1 PA RB FT RTB 500 kV 50 Mvar TUCURUI RT1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 498,687.49
  TUCURUI TR 230/138 kV TUCURUI TR1 PA RBF FT TR 230/138 kV TUCURUI TR1 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 12/9/2041 375,148.54
  TUCURUI TR 230/138 kV TUCURUI TR2 PA RBF FT TR 230/138 kV TUCURUI TR2 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 12/9/2041 375,148.54
  TUCURUI TR 230/69 kV TUCURUI TF1 PA RBF FT TR 230/69 kV TUCURUI TF1 PA 058/2001 IPCA RBNI REA 3216/2011 2/9/2015 2/8/2049 1,208,665.16
  TUCURUI TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,677,863.55
  TUCURUI TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,303,496.83

 

126 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  TUCURUI TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,349,801.71
  TUCURUI TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR2 PA 058/2001 IPCA RBNI REA 3216/2011 2/9/2015 2/8/2049 4,489,963.77
  TUCURUI TR 500/230 kV TUCURUI TRR1 PA RB FT TR 500/230 kV TUCURUI TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 559,287.85
  TUCURUI TR 500/230 kV TUCURUI TRR1 PA RB FT TR 500/230 kV TUCURUI TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 434,498.94
  TUCURUI TR 500/230 kV TUCURUI TRR1 PA RB FT TR 500/230 kV TUCURUI TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,116,600.57
  TUCURUI TR 500/69 kV TUCURUI TF1 PA RBF FT TR 500/69 kV TUCURUI TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 722,670.02
  TUCURUI TR 500/69 kV TUCURUI TF1 PA RBF FT TR 500/69 kV TUCURUI TF1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 561,427.11
  TUCURUI TR 500/69 kV TUCURUI TF1 PA RBF FT TR 500/69 kV TUCURUI TF1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,442,787.93
  TUCURUI TR 500/69 kV TUCURUI TRR2 PA RBF FT TR 500/69 kV TUCURUI TRR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 240,714.43
  TUCURUI TR 500/69 kV TUCURUI TRR2 PA RBF FT TR 500/69 kV TUCURUI TRR2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 187,005.97
  TUCURUI TR 500/69 kV TUCURUI TRR2 PA RBF FT TR 500/69 kV TUCURUI TRR2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 480,578.78
  TUCURUI VILA BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,044.21
  TUCURUI VILA BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 23,562.57
  TUCURUI VILA BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 61,084.56
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,575.58
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 102,597.34
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,575.58
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 102,597.34
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,462.12
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 39,575.58
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 102,597.34
  TUCURUI VILA EL 34,5 kV TUCURUI VILA  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 70,005.58
  TUCURUI VILA EL 34,5 kV TUCURUI VILA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 54,902.80
  TUCURUI VILA EL 34,5 kV TUCURUI VILA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 142,332.24
  TUCURUI VILA EL 69 kV TUCURUI VILA  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 70,005.58
  TUCURUI VILA EL 69 kV TUCURUI VILA  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 54,902.80
  TUCURUI VILA EL 69 kV TUCURUI VILA  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 142,332.24
  TUCURUI VILA MC 13,8 kV BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,969.63
  TUCURUI VILA MC 13,8 kV BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 57,227.39
  TUCURUI VILA MC 13,8 kV BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 148,358.60
  TUCURUI VILA MC 13,8 kV TR 13,8/0,22 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,119.20
  TUCURUI VILA MC 13,8 kV TR 13,8/0,22 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 35,385.33
  TUCURUI VILA MC 13,8 kV TR 13,8/0,22 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 91,734.36
  TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,119.20
  TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 35,385.33
  TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 91,734.36
  TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR2 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 45,119.20
  TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR2 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 35,385.33
  TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR2 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 91,734.36
  TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,727.01
  TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 44,488.90
  TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 115,334.84
  TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR2 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,727.01
  TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR2 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 44,488.90
  TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR2 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 115,334.84
  TUCURUI VILA MC 69 kV TR 69/34,5 kV TUCURUI VILA TR3 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,727.01
  TUCURUI VILA MC 69 kV TR 69/34,5 kV TUCURUI VILA TR3 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 44,488.90
  TUCURUI VILA MC 69 kV TR 69/34,5 kV TUCURUI VILA TR3 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 115,334.84
  TUCURUI VILA MG 69 kV TUCURUI VILA MG1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,675.23
  TUCURUI VILA MG 69 kV TUCURUI VILA MG1 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 184,831.39
  TUCURUI VILA MG 69 kV TUCURUI VILA MG1 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 479,164.38
  TUCURUI VILA TR 69/13,8 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 96,402.02
  TUCURUI VILA TR 69/13,8 kV TUCURUI VILA TR2 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,611.54
  TUCURUI VILA TR 69/34,5 kV TUCURUI VILA TR3 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,979.77
  TUCURUI VILA TR 69/34,5 kV TUCURUI VILA TR3 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 108,996.71
  TUCURUI VILA TR 69/34,5 kV TUCURUI VILA TR3 PA DIT   058/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 282,567.49
  UTINGA BC 230 kV 55 MVAr UTINGA BC1 PA RB FT BC 230 kV 55 MVAr UTINGA BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,422.76
  UTINGA BC 230 kV 55 MVAr UTINGA BC2 PA RB FT BC 230 kV 55 MVAr UTINGA BC2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,422.76
  UTINGA BC 230 kV 55 Mvar UTINGA BC3 PA RB FT BC 230 kV 55 Mvar UTINGA BC3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,422.76
  UTINGA BC 230 kV 55 Mvar UTINGA BC4 PA RB FT BC 230 kV 55 Mvar UTINGA BC4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,422.76
  UTINGA EL 230 kV UTINGA LT 230 kV GUAMA /UTINGA C-2 PA RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  UTINGA EL 230 kV UTINGA LT 230 kV MARITUBA /UTINGA C-1 PA RB   058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  UTINGA EL 230 kV UTINGA LT 230 kV MARITUBA /UTINGA C-1 PA RB   058/2001 IPCA RMEL REN 443/2011 25/09/2017 24/09/2040 18,244.51
  UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBNI REA 3362/2012 24/04/2015 23/04/2046 868,815.26
  UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2040 1,167.17
  UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 223,443.24
  UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 173,588.35
  UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 446,097.39
  UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2045 976,799.78
  UTINGA IB 230 kV MG 230 kV UTINGA MG1 PA IB1 RB FT MG 230 kV UTINGA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  UTINGA MC 230 kV BC 230 kV 55 MVAr UTINGA BC1 PA RB FT BC 230 kV 55 MVAr UTINGA BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,735.57
  UTINGA MC 230 kV BC 230 kV 55 MVAr UTINGA BC2 PA RB FT BC 230 kV 55 MVAr UTINGA BC2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,735.57
  UTINGA MC 230 kV BC 230 kV 55 Mvar UTINGA BC3 PA RB FT BC 230 kV 55 Mvar UTINGA BC3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,735.57
  UTINGA MC 230 kV BC 230 kV 55 Mvar UTINGA BC4 PA RB FT BC 230 kV 55 Mvar UTINGA BC4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,735.57
  UTINGA MC 230 kV TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  UTINGA MC 230 kV TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  UTINGA MC 230 kV TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  UTINGA MC 230 kV TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 124,464.90
  UTINGA MC 230 kV TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 319,857.11
  UTINGA MC 230 kV TR 230/69 kV UTINGA TF4 PA RBF FT TR 230/69 kV UTINGA TF4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,211.45
  UTINGA MC 69 kV TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  UTINGA MC 69 kV TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  UTINGA MC 69 kV TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  UTINGA MC 69 kV TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 43,154.33
  UTINGA MC 69 kV TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 110,900.49
  UTINGA MC 69 kV TR 230/69 kV UTINGA TF4 PA RBF FT TR 230/69 kV UTINGA TF4 PA 058/2001 IPCA RBNI REA 539/2006 21/02/2014 20/02/2043 77,734.78
  UTINGA MG 230 kV UTINGA MG1 PA RB FT MG 230 kV UTINGA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 582,343.13
  UTINGA MG 230 kV UTINGA MG1 PA RB FT MG 230 kV UTINGA MG1 PA 058/2001 IPCA RBNI REA 3362/2012 24/04/2015 23/04/2046 58,573.41
  UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RMEL REN 443/2011 18/12/2016 17/12/2030 33,306.93
  UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RMEL REN 443/2011 26/06/2017 25/06/2040 18,096.97
  UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RMEL REA 2837/2011 24/02/2013 23/02/2047 48,446.93
  UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 598,406.98
  UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 464,889.77
  UTINGA TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RMEL REA 2837/2011 24/02/2013 23/02/2048 53,128.20
  UTINGA TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 598,406.98
  UTINGA TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 464,889.77
  UTINGA TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,194,700.67
  UTINGA TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 598,406.98
  UTINGA TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 464,889.77
  UTINGA TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,194,700.67
  UTINGA TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RMEL REN 443/2011 20/11/2016 19/11/2030 33,283.36
  UTINGA TR 230/69 kV UTINGA TF4 PA RBF FT TR 230/69 kV UTINGA TF4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 598,406.98
  VARZEA GRANDE EL 230 kV VARZEA GRANDE LT 230 kV JAURU /VARZEA GRANDE C-2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 7/8/2016 7/7/2048 952,782.81
  VARZEA GRANDE EL 230 kV VARZEA GRANDE LT 230 kV VARZEA GRANDE /COXIPO C-2 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT 058/2001 IPCA RBNI REA 4967/2014 21/06/2016 20/06/2048 951,564.02
  VARZEA GRANDE MC 230 kV RTL 230 kV 30 Mvar VARZEA GRANDE RT1 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  VARZEA GRANDE MC 230 kV RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 7/8/2016 7/7/2044 3,402.71
  VARZEA GRANDE MC 230 kV RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 7/8/2016 7/7/2044 282,163.00
  VARZEA GRANDE MC 230 kV RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77

 

127 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  VARZEA GRANDE MG 230 kV VARZEA GRANDE MG2 MT RB FT MG 230 kV VARZEA GRANDE MG2 MT 058/2001 IPCA RBNI REA 4967/2014 7/8/2016 7/7/2045 125,388.31
  VARZEA GRANDE MG 230 kV VARZEA GRANDE MG2 MT RB FT MG 230 kV VARZEA GRANDE MG2 MT 058/2001 IPCA RBNI REA 4967/2014 7/8/2016 7/7/2045 21,659.92
  VARZEA GRANDE MG 230 kV VARZEA GRANDE MG2 MT RB FT MG 230 kV VARZEA GRANDE MG2 MT 058/2001 IPCA RBNI REA 4967/2014 7/8/2016 7/7/2045 21,659.92
  VARZEA GRANDE MG 230 kV VARZEA GRANDE MG2 MT RB FT MG 230 kV VARZEA GRANDE MG2 MT 058/2001 IPCA RBNI REA 4967/2014 7/8/2016 7/7/2045 525,679.82
  VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT1 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,740.23
  VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 357,740.23
  VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 277,920.85
  VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 714,217.11
  VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 7/8/2016 7/7/2050 56,564.38
  VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 7/8/2016 7/7/2051 69,308.89
  VARZEA GRANDE RTN 69 kV 0 Mvar VARZEA GRANDE RTN1 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC1 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC1 PA 058/2001 IPCA RMEL REN 443/2011 18/08/2017 17/08/2040 18,182.91
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC1 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 252,945.25
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC1 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,507.83
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC1 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 504,997.21
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RMEL REN 443/2011 30/08/2017 29/08/2040 18,202.36
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RMEL REN 443/2011 6/7/2017 6/6/2047 12,788.82
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RMEL REN 443/2011 6/7/2017 6/6/2047 12,788.82
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RMEL REN 443/2011 6/7/2017 6/6/2047 12,788.82
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 252,945.25
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,507.83
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 504,997.21
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC3 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 252,945.25
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC3 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC3 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,507.83
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC3 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC3 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 504,997.21
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC4 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC4 PA 058/2001 IPCA RMEL REN 443/2011 10/5/2017 10/4/2040 18,260.72
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC4 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 252,945.25
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC4 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC4 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 196,507.83
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC4 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC4 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 504,997.21
  VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,521,128.53
  VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,181,732.70
  VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,036,885.18
  VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,521,128.53
  VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,181,732.70
  VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,036,885.18
  VILA DO CONDE EL 230 kV VILA DO CONDE LT 230 kV ALBRAS /VILA DO CONDE C-1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 214,869.33
  VILA DO CONDE EL 230 kV VILA DO CONDE LT 230 kV ALBRAS /VILA DO CONDE C-2 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 214,869.33
  VILA DO CONDE EL 230 kV VILA DO CONDE LT 230 kV VILA DO CONDE /GUAMA C-1 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 210,404.74
  VILA DO CONDE EL 230 kV VILA DO CONDE LT 230 kV VILA DO CONDE /GUAMA C-2 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA 058/2001 IPCA RMEL REN 443/2011 3/6/2017 3/5/2040 17,915.37
  VILA DO CONDE EL 230 kV VILA DO CONDE LT 230 kV VILA DO CONDE /GUAMA C-2 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 210,404.74
  VILA DO CONDE EL 500 kV VILA DO CONDE LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,546.72
  VILA DO CONDE EL 69 kV VILA DO CONDE  CELPA C1 DIT   058/2001 IPCA RCDM REA 4058/2013 21/06/2017 20/06/2047 388,772.20
  VILA DO CONDE EL 69 kV VILA DO CONDE  CELPA C2 DIT   058/2001 IPCA RCDM REA 4058/2013 21/06/2017 20/06/2047 389,399.33
  VILA DO CONDE EL 69 kV VILA DO CONDE  CELPA C3 DIT   058/2001 IPCA RCDM REN 443/2011 10/3/2018 10/2/2046 319,314.19
  VILA DO CONDE IB 13,8 kV MG 500 kV VILA DO CONDE MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 25,237.44
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB1 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB10 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB10 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 102,269.43
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB10 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 262,817.90
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB11 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB11 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 102,269.43
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB11 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 262,817.90
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB14 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBNI REA 4058/2013 3/11/2016 3/10/2046 876,236.58
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB2 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 134,434.70
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB4 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB5 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB6 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB6 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBNI REA 4058/2013 3/11/2016 3/10/2046 1,319,772.51
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB7 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB8 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB8 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 102,269.43
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB8 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 262,817.90
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB9 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB9 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 102,269.43
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB9 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 262,817.90
  VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB1 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB2 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB3 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB3 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 338,022.67
  VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB3 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 868,670.25
  VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB4 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,103.41
  VILA DO CONDE IB 69 kV MG 500 kV VILA DO CONDE MG1 PA IB1 DIT   058/2001 IPCA RCDM REA 4058/2013 3/11/2016 3/10/2047 282,171.55
  VILA DO CONDE MC 13,8 kV CS 150/-90 MVAr VILA DO CONDE CS1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 59,739.15
  VILA DO CONDE MC 13,8 kV CS 150/-90 MVAr VILA DO CONDE CS2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 59,739.15
  VILA DO CONDE MC 13,8 kV TR 230/69 kV VILA DO CONDE TR7 PA RBF FT TR 230/69 kV VILA DO CONDE TR7 PA 058/2001 IPCA RBNI REA 4058/2013 12/1/2015 30/11/2038 239,409.99
  VILA DO CONDE MC 13,8 kV TR 230/69 kV VILA DO CONDE TR8 PA RBF FT TR 230/69 kV VILA DO CONDE TR8 PA 058/2001 IPCA RBNI REA 4058/2013 12/1/2015 30/11/2038 706,165.20
  VILA DO CONDE MC 230 kV  DESMONTAGEM EQP RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBNI REA 4058/2013 3/11/2016 3/10/2045 396,297.28
  VILA DO CONDE MC 230 kV BC 230 kV 111 MVAr VILA DO CONDE BC1 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 166,044.60
  VILA DO CONDE MC 230 kV BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 166,044.60
  VILA DO CONDE MC 230 kV BC 230 kV 111 MVAr VILA DO CONDE BC3 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 166,044.60
  VILA DO CONDE MC 230 kV BC 230 kV 111 MVAr VILA DO CONDE BC4 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 166,044.60
  VILA DO CONDE MC 230 kV TR 230/13,8 kV VILA DO CONDE TF1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 143,841.76
  VILA DO CONDE MC 230 kV TR 230/13,8 kV VILA DO CONDE TF2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 143,841.76
  VILA DO CONDE MC 230 kV TR 230/69 kV VILA DO CONDE TF3 PA RBF FT TR 230/69 kV VILA DO CONDE TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 143,841.76
  VILA DO CONDE MC 230 kV TR 230/69 kV VILA DO CONDE TR7 PA RBF FT TR 230/69 kV VILA DO CONDE TR7 PA 058/2001 IPCA RBNI REA 4058/2013 12/1/2015 30/11/2045 814,244.93
  VILA DO CONDE MC 230 kV TR 230/69 kV VILA DO CONDE TR8 PA RBF FT TR 230/69 kV VILA DO CONDE TF6 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 143,841.76
  VILA DO CONDE MC 230 kV TR 230/69 kV VILA DO CONDE TR8 PA RBF FT TR 230/69 kV VILA DO CONDE TF6 PA 058/2001 IPCA RBNI REA 4058/2013 12/1/2015 30/11/2044 600,552.86
  VILA DO CONDE MC 230 kV TR 500/230 kV VILA DO CONDE TR1 PA RB FT TR 500/230 kV VILA DO CONDE TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 143,841.76
  VILA DO CONDE MC 230 kV TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 143,841.76
  VILA DO CONDE MC 230 kV TR 500/230 kV VILA DO CONDE TR3 PA RB FT TR 500/230 kV VILA DO CONDE TR3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 143,841.76
  VILA DO CONDE MC 230 kV TR 500/230 kV VILA DO CONDE TR4 PA RB FT TR 500/230 kV VILA DO CONDE TR4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 143,841.76
  VILA DO CONDE MC 500 kV RTB 500 kV 165 Mvar VILA DO CONDE RT4 PA RB FT RTB 500 kV 165 Mvar VILA DO CONDE RT4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 383,886.18
  VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR1 PA RB FT TR 500/230 kV VILA DO CONDE TR1 PA 058/2001 IPCA RMEL REA 2837/2011 13/07/2013 7/12/2036 32,764.54
  VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR1 PA RB FT TR 500/230 kV VILA DO CONDE TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,005.44
  VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,005.44
  VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RMEL REA 2837/2011 13/07/2013 7/12/2036 32,764.54
  VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR3 PA RB FT TR 500/230 kV VILA DO CONDE TR3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,005.44
  VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR4 PA RB FT TR 500/230 kV VILA DO CONDE TR4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,005.44
  VILA DO CONDE MC 69 kV TR 230/69 kV VILA DO CONDE TF3 PA RBF FT TR 230/69 kV VILA DO CONDE TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  VILA DO CONDE MC 69 kV TR 230/69 kV VILA DO CONDE TR7 PA RBF FT TR 230/69 kV VILA DO CONDE TR7 PA 058/2001 IPCA RBNI REA 4058/2013 12/1/2015 30/11/2046 374,299.87
  VILA DO CONDE MC 69 kV TR 230/69 kV VILA DO CONDE TR8 PA RBF FT TR 230/69 kV VILA DO CONDE TR8 PA 058/2001 IPCA RBNI REA 4058/2013 12/1/2015 30/11/2044 375,774.30
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBNI REN 443/2011 10/3/2018 10/2/2049 36,568.82
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 17/07/2017 16/07/2047 12,826.92
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 17/07/2017 16/07/2047 12,826.92
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 17/07/2017 16/07/2047 12,826.92
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 4/6/2017 4/5/2047 12,729.77
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 4/6/2017 4/5/2047 12,729.77
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 4/6/2017 4/5/2047 12,729.77
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 4/6/2017 4/5/2047 12,729.77

 

128 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 4/6/2017 4/5/2047 12,729.77
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 4/6/2017 4/5/2047 12,729.77
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 22/12/2017 21/12/2050 76,140.45
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBNI REA 4058/2013 3/11/2016 3/10/2045 1,137,752.75
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,007,388.68
  VILA DO CONDE RTB 500 kV 165 Mvar VILA DO CONDE RT4 PA RB FT RTB 500 kV 165 Mvar VILA DO CONDE RT4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 788,678.61
  VILA DO CONDE RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA RB FT RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 262,034.54
  VILA DO CONDE RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA RB FT RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 203,569.12
  VILA DO CONDE RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA RB FT RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 523,143.71
  VILA DO CONDE RTL 500 kV 163 MVAr VILA DO CONDE RT1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RMEL REA 2837/2011 13/07/2013 7/12/2036 32,764.54
  VILA DO CONDE RTL 500 kV 163 MVAr VILA DO CONDE RT1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 785,716.51
  VILA DO CONDE RTL 500 kV 163 MVAr VILA DO CONDE RT1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 610,406.60
  VILA DO CONDE RTL 500 kV 163 MVAr VILA DO CONDE RT1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,568,658.26
  VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RMEL REN 443/2011 2/3/2017 2/2/2031 21,260.55
  VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 420,647.81
  VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 326,792.42
  VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 420,647.81
  VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 326,792.42
  VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2030 21,134.58
  VILA DO CONDE TR 230/69 kV VILA DO CONDE TF3 PA RBF FT TR 230/69 kV VILA DO CONDE TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 181,602.14
  VILA DO CONDE TR 230/69 kV VILA DO CONDE TF3 PA RBF FT TR 230/69 kV VILA DO CONDE TF3 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 141,082.88
  VILA DO CONDE TR 230/69 kV VILA DO CONDE TR7 PA RBF FT TR 230/69 kV VILA DO CONDE TR7 PA 058/2001 IPCA RBNI REA 4058/2013 12/1/2015 30/11/2049 1,747,433.32
  VILA DO CONDE TR 230/69 kV VILA DO CONDE TR8 PA RBF FT TR 230/69 kV VILA DO CONDE TR8 PA 058/2001 IPCA RBNI REA 4058/2013 12/1/2015 30/11/2049 1,747,433.32
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR1 PA RB FT TR 500/230 kV VILA DO CONDE TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,978,433.66
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR1 PA RB FT TR 500/230 kV VILA DO CONDE TR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,537,003.42
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RMEL REN 443/2011 4/7/2017 4/6/2047 12,730.73
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RMEL REN 443/2011 4/7/2017 4/6/2047 12,730.73
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RMEL REN 443/2011 4/7/2017 4/6/2047 12,730.73
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,978,433.66
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,537,003.42
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,949,880.47
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR3 PA RB FT TR 500/230 kV VILA DO CONDE TR3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,978,433.66
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR3 PA RB FT TR 500/230 kV VILA DO CONDE TR3 PA 058/2001 IPCA RMEL REN 443/2011 15/06/2016 14/06/2030 32,769.03
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR4 PA RB FT TR 500/230 kV VILA DO CONDE TR4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,978,433.66
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TRR1 PA RB FT TR 500/230 kV VILA DO CONDE TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 659,477.89
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TRR1 PA RB FT TR 500/230 kV VILA DO CONDE TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 512,334.47
  VILHENA BC 230 kV 18,5 Mvar VILHENA BC1 RO RB FT BC 230 kV 18,5 Mvar VILHENA BC1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,719.76
  VILHENA BC 230 kV 18,5 Mvar VILHENA BC2 RO RB FT BC 230 kV 18,5 Mvar VILHENA BC2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,719.76
  VILHENA BC 230 kV 18,5 Mvar VILHENA BC3 RO RB FT BC 230 kV 18,5 Mvar VILHENA BC3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,719.76
  VILHENA CE 100/-50 Mvar VILHENA CE1 RO RB FT CE 100/-50 Mvar VILHENA CE1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,350,856.44
  VILHENA CR 230 kV 0 Mvar VILHENA BC6 RO RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBNI REA 6171/2017 30/01/2019 30/01/2039 3,797,594.34
  VILHENA EL 230 kV VILHENA LT 230 kV PIMENTA BUENO /VILHENA C-1 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 215,994.14
  VILHENA EL 230 kV VILHENA LT 230 kV PIMENTA BUENO /VILHENA C-3 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 601,335.31
  VILHENA EL 230 kV VILHENA LT 230 kV VILHENA /JAURU C-3 RO/MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBNI REA 6171/2017 30/01/2019 30/01/2052 209,771.36
  VILHENA EL 230 kV VILHENA LT 230 kV VILHENA /JAURU C-3 RO/MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 601,335.31
  VILHENA IB 230 kV MG 230 kV VILHENA MG1 RO IB1 RB FT MG 230 kV VILHENA MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,641.40
  VILHENA IB 230 kV MG 230 kV VILHENA MG1 RO IB1 RB FT MG 230 kV VILHENA MG1 RO 058/2001 IPCA RBNI REA 6171/2017 26/11/2018 26/11/2051 126,009.70
  VILHENA MC 230 kV BC 230 kV 18,5 Mvar VILHENA BC1 RO RB FT BC 230 kV 18,5 Mvar VILHENA BC1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 164,940.98
  VILHENA MC 230 kV BC 230 kV 18,5 Mvar VILHENA BC2 RO RB FT BC 230 kV 18,5 Mvar VILHENA BC2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,250.01
  VILHENA MC 230 kV BC 230 kV 18,5 Mvar VILHENA BC3 RO RB FT BC 230 kV 18,5 Mvar VILHENA BC3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,250.01
  VILHENA MC 230 kV CE 100/-50 Mvar VILHENA CE1 RO RB FT CE 100/-50 Mvar VILHENA CE1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 154,799.96
  VILHENA MC 230 kV CR 230 kV 0 Mvar VILHENA BC6 RO RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBNI REA 6171/2017 30/01/2019 30/01/2041 634,019.03
  VILHENA MC 230 kV RTB 230 kV 20 Mvar VILHENA RT1 RO RB FT RTB 230 kV 20 Mvar VILHENA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,194.36
  VILHENA MC 230 kV RTL 230 kV 0 Mvar VILHENA RT6 RO RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 197,047.17
  VILHENA MC 230 kV RTL 230 kV 0 Mvar VILHENA RT7 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 197,047.17
  VILHENA MC 230 kV RTL 230 kV 20 Mvar VILHENA RT2 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,864.77
  VILHENA MC 230 kV RTN 230 kV 0,1 Mvar VILHENA RN2 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,271.34
  VILHENA MC 230 kV TR 230/69 kV VILHENA TR1 RO RBF FT TR 230/69 kV VILHENA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  VILHENA MC 230 kV TR 230/69 kV VILHENA TR2 RO RBF FT TR 230/69 kV VILHENA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,026.61
  VILHENA MC 69 kV TR 230/69 kV VILHENA TR1 RO RBF FT TR 230/69 kV VILHENA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  VILHENA MC 69 kV TR 230/69 kV VILHENA TR2 RO RBF FT TR 230/69 kV VILHENA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 55,548.33
  VILHENA MG 230 kV VILHENA MG1 RO RB FT MG 230 kV VILHENA MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 486,519.43
  VILHENA MG 230 kV VILHENA MG3 RO RB FT MG 230 kV VILHENA MG3 RO 021/2009 IPCA RBNI REA 6171/2017 30/01/2019 30/01/2050 159,811.41
  VILHENA MG 230 kV VILHENA MG3 RO RB FT MG 230 kV VILHENA MG3 RO 021/2009 IPCA RBNI REA 6171/2017 30/01/2019 30/01/2042 85,431.92
  VILHENA RTB 230 kV 20 Mvar VILHENA RT1 RO RB FT RTB 230 kV 20 Mvar VILHENA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,023.72
  VILHENA RTL 230 kV 0 Mvar VILHENA RT6 RO RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 598,928.90
  VILHENA RTL 230 kV 0 Mvar VILHENA RT7 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 593,832.01
  VILHENA RTL 230 kV 20 Mvar VILHENA RT2 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,023.72
  VILHENA RTN 230 kV 0,1 Mvar VILHENA RN2 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,649.02
  VILHENA TR 230/69 kV VILHENA TR1 RO RBF FT TR 230/69 kV VILHENA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 272,128.15
  VILHENA TR 230/69 kV VILHENA TR2 RO RBF FT TR 230/69 kV VILHENA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 272,128.15
FURNAS ADRIANOPOLIS BC 13,8 kV 10 Mvar ADRIANOPOLIS BC7 RJ RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC7 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  ADRIANOPOLIS BC 13,8 kV 10 Mvar ADRIANOPOLIS BC8 RJ RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC8 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  ADRIANOPOLIS BC 13,8 kV 10 Mvar ADRIANOPOLIS BC9 RJ RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC9 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  ADRIANOPOLIS BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ RBF FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,908.27
  ADRIANOPOLIS BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ RBF FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,908.27
  ADRIANOPOLIS BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 206,738.00
  ADRIANOPOLIS BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 206,738.00
  ADRIANOPOLIS BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 335,589.57
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /CEPEL C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /CEPEL C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 27,750.79
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /CEPEL C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 27,750.79
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /CEPEL C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 24/03/2014 23/03/2038 31,498.83
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 27,750.79
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2038 31,517.24
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 27,750.79
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 25/04/2014 24/04/2038 31,587.20
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 27,750.79
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 23/05/2014 22/05/2038 31,662.78
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 27,750.79
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RMEL REN 643/2014 17/05/2014 16/05/2038 31,644.49
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 27,750.79
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 8/8/2014 8/7/2038 31,865.36
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 27,750.79
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 14/02/2016 13/02/2044 28,734.03
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 17/04/2020 16/04/2050 19,349.08
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2045 159,163.31
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 28,149.64
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 28,149.64
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 40,796.58
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 31/05/2019 30/05/2049 19,188.63
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 5/6/2015 5/5/2045 159,229.61

 

129 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 5/6/2015 5/5/2042 56,323.13
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 5/6/2015 5/5/2042 40,813.86
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 22/04/2019 21/04/2049 17,342.35
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 65,723.73
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 24/06/2016 23/06/2046 193,565.50
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-2 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-2 RJ 062/2001 IPCA RBNI REA 3578/2012 30/04/2019 29/04/2052 103,093.15
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-2 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 5/3/2017 5/2/2049 166,608.05
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,075,965.79
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP RB FT LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RMEL REN 643/2014 5/2/2016 5/1/2038 41,820.46
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  ADRIANOPOLIS IB 138 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,210.67
  ADRIANOPOLIS IB 138 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2040 61,429.02
  ADRIANOPOLIS IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB1 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  ADRIANOPOLIS IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  ADRIANOPOLIS IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB3 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  ADRIANOPOLIS IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB3 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBNI REA 3578/2012 5/3/2017 5/2/2049 175,158.06
  ADRIANOPOLIS IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  ADRIANOPOLIS IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB3 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  ADRIANOPOLIS MC 13,8 kV BC 13,8 kV 10 Mvar ADRIANOPOLIS BC7 RJ RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC7 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  ADRIANOPOLIS MC 13,8 kV BC 13,8 kV 10 Mvar ADRIANOPOLIS BC8 RJ RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC8 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  ADRIANOPOLIS MC 13,8 kV BC 13,8 kV 10 Mvar ADRIANOPOLIS BC9 RJ RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC9 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  ADRIANOPOLIS MC 13,8 kV BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ RBF FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  ADRIANOPOLIS MC 13,8 kV BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ RBF FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  ADRIANOPOLIS MC 13,8 kV RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ RB FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  ADRIANOPOLIS MC 13,8 kV RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT4 RJ RB FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT4 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1A RJ 062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2040 30,714.52
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2040 30,714.52
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2040 30,714.52
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2040 30,714.52
  ADRIANOPOLIS MC 345 kV BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ 062/2001 IPCA RMEL REN 643/2014 19/01/2015 18/01/2045 176,457.64
  ADRIANOPOLIS MC 345 kV BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 62,975.00
  ADRIANOPOLIS MC 345 kV BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 186,115.34
  ADRIANOPOLIS MC 345 kV BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 186,115.34
  ADRIANOPOLIS MC 345 kV BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ 062/2001 IPCA RMEL REN 643/2014 1/12/2015 1/11/2045 176,360.81
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1A RJ 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 70,043.36
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 21/11/2015 20/11/2045 181,150.73
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 21/11/2015 20/11/2043 30,390.06
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 21/11/2015 20/11/2043 30,390.06
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 21/11/2015 20/11/2043 30,390.06
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 48,366.86
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 48,366.86
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 48,366.86
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 48,366.86
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 48,366.86
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 70,043.36
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2053 134,118.11
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 48,366.86
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 48,366.86
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2053 134,118.11
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 65,383.23
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR51 RJ 062/2001 IPCA RBNI REA 3578/2012 31/05/2019 30/05/2049 19,188.63
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR51 RJ 062/2001 IPCA RBNI REA 3578/2012 22/04/2019 21/04/2049 17,161.37
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR51 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2053 134,118.11
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 65,383.23
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2050 19,352.06
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2050 46,590.56
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2051 23,959.24
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2053 105,449.57
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2050 19,352.06
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2050 19,352.06
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2050 19,352.06
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  ADRIANOPOLIS MC 500 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR51 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  ADRIANOPOLIS MC 500 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  ADRIANOPOLIS MC 500 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  ADRIANOPOLIS MG 500 kV ADRIANOPOLIS MG1 RJ RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 349.73
  ADRIANOPOLIS MG 500 kV ADRIANOPOLIS MG1 RJ RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RMEL REN 443/2011 10/5/2015 10/4/2028 7,815.18
  ADRIANOPOLIS MG 500 kV ADRIANOPOLIS MG1 RJ RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RMEL REN 443/2011 14/03/2016 13/03/2029 8,452.49
  ADRIANOPOLIS MG 500 kV ADRIANOPOLIS MG1 RJ RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,932,149.79
  ADRIANOPOLIS RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ RB FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,101.09
  ADRIANOPOLIS RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT4 RJ RB FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT4 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,101.09
  ADRIANOPOLIS RTL 500 kV 136 MVAr ADRIANOPOLIS RT5 RJ RB FT RTL 500 kV 136 MVAr ADRIANOPOLIS RT5 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 516,341.85
  ADRIANOPOLIS RTL 500 kV 136 MVAr ADRIANOPOLIS RT6 RJ RB FT RTL 500 kV 136 MVAr ADRIANOPOLIS RT6 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 516,341.85
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR1A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RMEL REN 643/2014 21/11/2015 20/11/2048 1,641,740.56
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RMEL REA 8707/2020 12/11/2020 12/11/2054 766,764.66
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR1BD RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1BD RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR1BD RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1BD RJ 062/2001 IPCA RMEL REN 643/2014 21/11/2015 20/11/2050 1,353,105.45
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RMEL REA 8707/2020 17/05/2021 17/05/2055 766,764.66
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RMEL REN 643/2014 17/10/2015 16/10/2048 1,638,124.29
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,022,166.47
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2AD RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2AD RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2AD RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2AD RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,022,166.47
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2AD RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2AD RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,929,832.51
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2AD RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2AD RJ 062/2001 IPCA RMEL REN 643/2014 17/10/2015 16/10/2050 1,351,211.98
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TRR1 RJ RBF FT TR 345/138 kV ADRIANOPOLIS TRR1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,899.90
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TRR2 RJ RBF FT TR 345/138 kV ADRIANOPOLIS TRR2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,899.90

 

130 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TR51 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR51 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,319,161.14
  ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TR53 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,319,161.14
  ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TR53 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,141,341.79
  ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TR53 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RMEL REA 8707/2020 19/12/2020 19/12/2055 3,211,365.86
  ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TR53D RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53D RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,319,161.14
  ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TR53D RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53D RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,141,341.79
  ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TR53D RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53D RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,137,721.18
  ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,319,161.14
  ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TRR1 RJ RB FT TR 500/345 kV ADRIANOPOLIS TRR1 RJ 062/2001 IPCA RMEL REA 8707/2020 10/9/2020 10/9/2055 1,070,455.28
  ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TRR1D RJ RB FT TR 500/345 kV ADRIANOPOLIS TRR1D RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 439,976.80
  AGUA VERMELHA IB 440 kV MG 500 kV AGUA VERMELHA MG1 SP IB5 RB FT MG 500 kV AGUA VERMELHA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  AGUA VERMELHA IB 440 kV MG 500 kV AGUA VERMELHA MG1 SP IB5 RB FT MG 500 kV AGUA VERMELHA MG1 SP 062/2001 IPCA RMEL REN 643/2014 5/8/2015 5/7/2030 14,346.98
  AGUA VERMELHA IB 500 kV MG 500 kV AGUA VERMELHA MG2 SP IB5 RB FT MG 500 kV AGUA VERMELHA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  AGUA VERMELHA IB 500 kV MG 500 kV AGUA VERMELHA MG2 SP IB5 RB FT MG 500 kV AGUA VERMELHA MG2 SP 062/2001 IPCA RMEL REN 643/2014 5/8/2015 5/7/2030 14,346.98
  AGUA VERMELHA MC 440 kV TR 500/440 kV AGUA VERMELHA TR8 SP RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  AGUA VERMELHA MC 440 kV TR 500/440 kV AGUA VERMELHA TR8 SP RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RMEL REN 643/2014 5/8/2015 5/7/2045 1,415.05
  AGUA VERMELHA MC 500 kV TR 500/440 kV AGUA VERMELHA TR8 SP RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  AGUA VERMELHA MC 500 kV TR 500/440 kV AGUA VERMELHA TR8 SP RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RMEL REN 643/2014 5/8/2015 5/7/2045 1,415.05
  AGUA VERMELHA MG 500 kV AGUA VERMELHA MG2 SP RB FT MG 500 kV AGUA VERMELHA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 754,787.85
  AGUA VERMELHA TR 500/440 kV AGUA VERMELHA TR8 SP RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,445,119.35
  AGUA VERMELHA TR 500/440 kV AGUA VERMELHA TRR1 SP RB FT TR 500/440 kV AGUA VERMELHA TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 481,706.45
  AGUAS LINDAS EL 230 kV AGUAS LINDAS LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2040 938,865.08
  AGUAS LINDAS EL 230 kV AGUAS LINDAS LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2040 938,865.08
  AGUAS LINDAS MG 230 kV AGUAS LINDAS MG2 GO RB FT MG 230 kV AGUAS LINDAS MG2 GO 062/2001 IPCA RBNI REA 5861/2016 28/11/2017 27/11/2045 0.01
  AGUAS LINDAS MG 230 kV AGUAS LINDAS MG2 GO RB FT MG 230 kV AGUAS LINDAS MG2 GO 062/2001 IPCA RBNI REA 2367/2010 26/11/2013 25/11/2036 585,030.39
  ANGRA FUR BC 13,8 kV 3 Mvar ANGRA FUR BC1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 20,625.54
  ANGRA FUR BC 13,8 kV 5 Mvar ANGRA FUR BC2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 20,625.54
  ANGRA FUR BC 13,8 kV 5 Mvar ANGRA FUR BC2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 33,275.72
  ANGRA FUR BC 13,8 kV 5 Mvar ANGRA FUR BC2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 94,787.90
  ANGRA FUR BC 138 kV 25 Mvar ANGRA FUR BC1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 89,235.63
  ANGRA FUR BC 138 kV 25 Mvar ANGRA FUR BC1A RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 143,966.12
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST1 DIT   062/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2040 524.50
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST1 DIT   062/2001 IPCA RMEL REN 443/2011 1/10/2017 1/9/2041 160.70
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST1 DIT   062/2001 IPCA RMEL REN 443/2011 1/10/2017 1/9/2041 160.70
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST1 DIT   062/2001 IPCA RMEL REN 443/2011 1/10/2017 1/9/2041 160.70
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,465.03
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST10 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,465.03
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST10 DIT   062/2001 IPCA RMEL REN 643/2014 10/4/2016 10/3/2045 5,933.13
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST11 DIT   062/2001 IPCA RMEL REN 643/2014 28/09/2016 27/09/2045 5,930.38
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST11 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,465.03
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST12 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,465.03
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST12 DIT   062/2001 IPCA RMEL REN 643/2014 10/11/2016 10/10/2045 5,936.34
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST2 DIT   062/2001 IPCA RMEL REN 643/2014 14/06/2016 13/06/2045 5,881.86
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,465.03
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,465.03
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST3 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 58,829.97
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST3 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 167,580.73
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2040 524.50
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,465.03
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST5 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,465.03
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST5 DIT   062/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2040 524.50
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST6 DIT   062/2001 IPCA RMEL REN 643/2014 7/12/2016 7/11/2045 5,894.69
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST6 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,465.03
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST7 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,465.03
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST7 DIT   062/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2040 524.50
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST8 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,465.03
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST9 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,465.03
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST9 DIT   062/2001 IPCA RMEL REN 643/2014 27/09/2016 26/09/2045 5,929.93
  ANGRA FUR EL 138 kV ANGRA FUR  MAMBUCABA-AMPLA DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 563,810.12
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 563,810.12
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 563,810.12
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBNI REA 4347/2013 7/6/2015 7/5/2040 8,837.05
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2040 14,313.33
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2040 14,313.33
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2040 14,313.33
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RMEL REN 643/2014 12/2/2016 12/1/2047 281,499.18
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 524,938.95
  ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,210.67
  ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB3 DIT   062/2001 IPCA RMEL REN 643/2014 14/07/2016 13/07/2038 12,449.24
  ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB4 DIT   062/2001 IPCA RMEL REN 643/2014 31/05/2016 30/05/2038 12,411.90
  ANGRA FUR IB 500 kV MG 500 kV ANGRA FUR MG1 RJ IB1 RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  ANGRA FUR MC 13,8 kV BC 13,8 kV 3 Mvar ANGRA FUR BC1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 52,861.61
  ANGRA FUR MC 13,8 kV BC 13,8 kV 5 Mvar ANGRA FUR BC2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 52,861.61
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 33,617.23
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 1/10/2017 1/9/2041 160.70
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 1/10/2017 1/9/2041 160.70
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 1/10/2017 1/9/2041 160.70
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1B RJ DIT   062/2001 IPCA RMEL REN 643/2014 2/2/2016 2/1/2045 5,820.98
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1B RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 33,617.23
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 12,855.45
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RMEL REN 443/2011 1/10/2017 1/9/2041 160.70
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RMEL REN 443/2011 18/01/2017 17/01/2041 160.82
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RMEL REN 443/2011 18/01/2017 17/01/2041 160.82
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1D RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 18,260.81
  ANGRA FUR MC 138 kV BC 138 kV 25 Mvar ANGRA FUR BC1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,446.37
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR T2A3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,001.78
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR T2A3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 135,522.22
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR T2A3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 386,043.25
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 1/10/2017 1/9/2040 4,204.62
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 1/10/2017 1/9/2040 4,204.62
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 1/10/2017 1/9/2040 4,204.62
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 77,933.01
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1B RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 77,933.01
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1B RJ DIT   062/2001 IPCA RMEL REN 643/2014 6/2/2016 6/1/2038 12,406.76
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RMEL REN 443/2011 26/01/2017 25/01/2040 4,210.82
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RMEL REN 443/2011 26/01/2017 25/01/2040 4,210.82
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RMEL REN 443/2011 26/01/2017 25/01/2040 4,210.82

 

131 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 77,933.01
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1D RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 77,933.01
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1D RJ DIT   062/2001 IPCA RMEL REN 643/2014 6/4/2016 6/3/2038 12,409.15
  ANGRA FUR MC 138 kV TR 138/138 kV ANGRA FUR TRD1 RJ MC1 RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 39,108.74
  ANGRA FUR MC 138 kV TR 138/138 kV ANGRA FUR TRD1 RJ MC2 RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 35,973.53
  ANGRA FUR MC 138 kV TR 138/138 kV ANGRA FUR TRD2 RJ MC1 RBF FT TR 138/138 kV ANGRA FUR TRD2 RJ 062/2001 IPCA RBNI REA 4089/2013 27/07/2018 27/07/2039 300,804.67
  ANGRA FUR MC 138 kV TR 138/138 kV ANGRA FUR TRD2 RJ MC2 RBF FT TR 138/138 kV ANGRA FUR TRD2 RJ 062/2001 IPCA RBNI REA 4089/2013 27/07/2018 27/07/2039 300,804.67
  ANGRA FUR MC 138 kV TR 138/4,16 kV ANGRA FUR T1A2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,001.78
  ANGRA FUR MC 138 kV TR 138/4,16 kV ANGRA FUR T1A2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 7/2/2016 7/1/2038 12,442.57
  ANGRA FUR MC 138 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  ANGRA FUR MC 138 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 135,395.54
  ANGRA FUR MC 138 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 388,083.82
  ANGRA FUR MC 500 kV RTL 500 kV 136 MVAr ANGRA FUR RT1 RJ RB FT RTL 500 kV 136 MVAr ANGRA FUR RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,918.57
  ANGRA FUR MC 500 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  ANGRA FUR MC 500 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 463,307.16
  ANGRA FUR MC 500 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,327,975.85
  ANGRA FUR MC 500 kV TR 500/19 kV ANGRA FUR TRG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  ANGRA FUR MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 12/2/2016 12/1/2045 50,843.80
  ANGRA FUR MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  ANGRA FUR MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 463,740.62
  ANGRA FUR MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,320,993.28
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,301,247.66
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,112,263.55
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,054,374.32
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBNI REA 4089/2013 27/07/2018 27/07/2049 81,190.80
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBNI REA 3578/2012 22/08/2012 21/08/2021 0.01
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 1,049.20
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029 7,603.37
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029 17,685.77
  ANGRA FUR RTL 500 kV 136 MVAr ANGRA FUR RT1 RJ RB FT RTL 500 kV 136 MVAr ANGRA FUR RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 516,341.85
  ANGRA FUR TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 19,644.27
  ANGRA FUR TR 138/13,8 kV ANGRA FUR TR1B RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 19,644.27
  ANGRA FUR TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 19,644.27
  ANGRA FUR TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 31,692.60
  ANGRA FUR TR 138/13,8 kV ANGRA FUR TR1D RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 19,644.27
  ANGRA FUR TR 138/138 kV ANGRA FUR TRD1 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 300,177.85
  ANGRA FUR TR 138/138 kV ANGRA FUR TRD2 RJ RBF FT TR 138/138 kV ANGRA FUR TRD2 RJ 062/2001 IPCA RBNI REA 4089/2013 27/07/2018 27/07/2053 2,062,478.14
  ANGRA FUR TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,065,451.34
  ANGRA FUR TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,729,504.76
  ANGRA FUR TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,957,274.02
  ANGRA FUR TR 500/138 kV ANGRA FUR TRR1 RJ RBF FT TR 500/138 kV ANGRA FUR TRR1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 354,826.67
  ANGRA FUR TR 500/138 kV ANGRA FUR TRR1 RJ RBF FT TR 500/138 kV ANGRA FUR TRR1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 575,976.01
  ANGRA FUR TR 500/138 kV ANGRA FUR TRR1 RJ RBF FT TR 500/138 kV ANGRA FUR TRR1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,650,918.22
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039 14,120.33
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039 14,120.33
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039 14,120.33
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039 14,120.33
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039 14,120.33
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039 14,120.33
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/7/2016 11/6/2039 14,140.55
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/7/2016 11/6/2039 14,140.55
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/7/2016 11/6/2039 14,140.55
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/7/2016 11/6/2039 14,140.55
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/7/2016 11/6/2039 14,140.55
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/7/2016 11/6/2039 14,140.55
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  ARARAQUARA FURNAS MG 500 kV ARARAQUARA FURNAS MG1 SP RB FT MG 500 kV ARARAQUARA FURNAS MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 622,737.60
  ARARAQUARA FURNAS MG 500 kV ARARAQUARA FURNAS MG1 SP RB FT MG 500 kV ARARAQUARA FURNAS MG1 SP 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 699.46
  ARARAQUARA FURNAS MG 500 kV ARARAQUARA FURNAS MG1 SP RB FT MG 500 kV ARARAQUARA FURNAS MG1 SP 062/2001 IPCA RMEL REN 443/2011 13/07/2017 7/12/2031 8,396.08
  ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR1 SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 412,063.15
  ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR1 SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 668,885.72
  ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR1 SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,917,225.01
  ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR2 SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 412,063.15
  ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RTCA SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 412,063.15
  ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RTPC SP RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 412,063.15
  ATIBAIA 2 EL 345 kV ATIBAIA 2 LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 4420/2013 9/10/2013 31/12/2042 748,885.82
  ATIBAIA 2 EL 345 kV ATIBAIA 2 LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4420/2013 9/10/2013 31/12/2042 748,885.82
  B.DESPACHO 3 EL 500 kV B.DESPACHO 3 LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG RB FT LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039 542,289.17
  B.DESPACHO 3 MC 500 kV RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG RB FT RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039 454,319.50
  B.DESPACHO 3 RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG RB FT RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039 589,194.46
  B.DESPACHO 3 RTL 500 kV 33,33 Mvar B.DESPACHO 3 RTR3 MG RB FT RTL 500 kV 33,33 Mvar B.DESPACHO 3 RTR3 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039 196,397.63
  BANDEIRANTES BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO RB FT BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 173,684.45
  BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE1 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,388,333.75
  BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE1 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,253,626.93
  BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE1 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,459,563.72
  BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE2 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,388,333.75
  BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE2 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,253,626.93
  BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE2 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,459,563.72
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 252,491.42
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035 6,547.88
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035 6,547.88
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035 6,547.88
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2052 59,659.58
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2052 59,659.58
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO 062/2001 IPCA RMEL REN 443/2011 20/11/2014 19/11/2035 6,548.59
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO 062/2001 IPCA RMEL REN 443/2011 20/11/2014 19/11/2035 6,548.59
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO 062/2001 IPCA RMEL REN 443/2011 20/11/2014 19/11/2035 6,548.59
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 252,491.42
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RMEL REN 443/2011 11/12/2014 11/11/2035 6,542.90
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RMEL REN 443/2011 11/12/2014 11/11/2035 6,542.90
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RMEL REN 443/2011 11/12/2014 11/11/2035 6,542.90
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RBNI REA 2230/2009 4/6/2015 4/5/2042 144,517.67
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RBNI REA 2230/2009 4/6/2015 4/5/2032 20,417.22
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2052 59,659.58
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2039 5,822.22
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RMEL REN 443/2011 14/11/2014 13/11/2035 6,544.33
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RMEL REN 443/2011 14/11/2014 13/11/2035 6,544.33
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RMEL REN 443/2011 14/11/2014 13/11/2035 6,544.33
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBNI REA 4347/2013 5/3/2017 5/2/2049 133,209.92

 

132 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBNI REA 4347/2013 5/3/2017 5/2/2046 70,474.13
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RMEL REN 443/2011 5/5/2014 5/4/2034 9,421.40
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RMEL REN 443/2011 5/5/2014 5/4/2034 9,421.40
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RMEL REN 443/2011 5/5/2014 5/4/2034 9,421.40
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034 9,442.73
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034 9,442.73
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034 9,442.73
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBNI REA 4347/2013 5/3/2017 5/2/2046 70,474.13
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBNI REA 4347/2013 5/3/2017 5/2/2049 133,209.92
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  BANDEIRANTES IB 230 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 91,639.72
  BANDEIRANTES IB 230 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 148,755.11
  BANDEIRANTES IB 230 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2052 59,659.58
  BANDEIRANTES IB 345 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  BANDEIRANTES IB 345 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 283,511.97
  BANDEIRANTES IB 345 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 812,629.45
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR1 GO RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR1 GO RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2052 59,659.58
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR1 GO RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RBNI REA 5861/2016 22/04/2019 21/04/2034 83,126.29
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RMEL REN 643/2014 26/08/2015 25/08/2036 20,135.16
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBNI REA 2230/2009 4/6/2015 4/5/2042 139,218.58
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 181,039.34
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR3 GO RB FT TR 345/230 kV BANDEIRANTES TR3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR3 GO RB FT TR 345/230 kV BANDEIRANTES TR3 GO 062/2001 IPCA RMEL REN 643/2014 6/8/2015 6/7/2036 19,994.11
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR4 GO RB FT TR 345/230 kV BANDEIRANTES TR4 GO 062/2001 IPCA RBNI REA 2230/2009 4/6/2015 4/5/2042 63,448.62
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR4 GO RB FT TR 345/230 kV BANDEIRANTES TR4 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR5 GO RB FT TR 345/230 kV BANDEIRANTES TR5 GO 062/2001 IPCA RBNI REA 4326/2013 6/1/2016 31/05/2046 928,849.73
  BANDEIRANTES MC 345 kV BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO RB FT BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO 062/2001 IPCA RMEL REN 643/2014 4/6/2013 4/5/2041 133,348.98
  BANDEIRANTES MC 345 kV BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO RB FT BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 186,115.34
  BANDEIRANTES MC 345 kV RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 110,704.01
  BANDEIRANTES MC 345 kV RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO 062/2001 IPCA RMEL REN 643/2014 17/03/2013 16/03/2041 179,960.30
  BANDEIRANTES MC 345 kV RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO 062/2001 IPCA RMEL REN 643/2014 24/03/2013 23/03/2041 180,070.57
  BANDEIRANTES MC 345 kV RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 110,704.01
  BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 915,783.21
  BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RMEL REN 643/2014 8/5/2015 8/4/2045 160,228.65
  BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR7 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR7 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR1 GO RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR1 GO RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RBNI REA 5861/2016 22/04/2019 21/04/2034 88,428.85
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RMEL REN 643/2014 26/08/2015 25/08/2045 160,483.17
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RMEL REN 643/2014 26/08/2015 25/08/2036 29,531.10
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 915,783.21
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR3 GO RB FT TR 345/230 kV BANDEIRANTES TR3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR3 GO RB FT TR 345/230 kV BANDEIRANTES TR3 GO 062/2001 IPCA RMEL REN 643/2014 6/8/2015 6/7/2036 29,324.22
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR4 GO RB FT TR 345/230 kV BANDEIRANTES TR4 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR5 GO RB FT TR 345/230 kV BANDEIRANTES TR5 GO 062/2001 IPCA RBNI REA 4326/2013 6/1/2016 31/05/2046 1,275,064.21
  BANDEIRANTES MG 345 kV BANDEIRANTES MG1 GO RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 877,962.71
  BANDEIRANTES MG 345 kV BANDEIRANTES MG1 GO RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,425,161.92
  BANDEIRANTES MG 345 kV BANDEIRANTES MG1 GO RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBNI REA 3468/2012 31/08/2012 30/08/2050 809,344.37
  BANDEIRANTES MG 345 kV BANDEIRANTES MG1 GO RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBNI REA 4326/2013 6/1/2016 31/05/2045 548,009.94
  BANDEIRANTES MG 345 kV BANDEIRANTES MG1 GO RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2031 8,413.46
  BANDEIRANTES RTB 13,8 kV 25 MVAr BANDEIRANTES RT3 GO RB FT RTB 13,8 kV 25 MVAr BANDEIRANTES RT3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,528.28
  BANDEIRANTES RTB 13,8 kV 25 MVAr BANDEIRANTES RT3 GO RB FT RTB 13,8 kV 25 MVAr BANDEIRANTES RT3 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 187,532.45
  BANDEIRANTES RTB 13,8 kV 25 MVAr BANDEIRANTES RT4 GO RB FT RTB 13,8 kV 25 MVAr BANDEIRANTES RT4 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,528.28
  BANDEIRANTES RTB 13,8 kV 25 MVAr BANDEIRANTES RT4 GO RB FT RTB 13,8 kV 25 MVAr BANDEIRANTES RT4 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 187,532.45
  BANDEIRANTES RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,392.31
  BANDEIRANTES RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 554,168.56
  BANDEIRANTES RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,392.31
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 382,402.91
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 620,739.43
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,779,223.46
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR7 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 382,402.91
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR7 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 620,739.43
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR7 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,779,223.46
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TRR1 GO RB FT TR 10,5/345 kV BANDEIRANTES TRR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 126,566.09
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TRR1 GO RB FT TR 10,5/345 kV BANDEIRANTES TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 205,449.70
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TRR1 GO RB FT TR 10,5/345 kV BANDEIRANTES TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 588,879.81
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR1 GO RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RMEL REA 8707/2020 18/08/2020 18/08/2054 2,330,733.75
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR1D GO RB FT TR 345/230 kV BANDEIRANTES TR1D GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 658,767.11
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR1D GO RB FT TR 345/230 kV BANDEIRANTES TR1D GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,069,350.43
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR1D GO RB FT TR 345/230 kV BANDEIRANTES TR1D GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,065,075.74
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 658,767.11
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,069,350.43
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,065,075.74
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR3 GO RB FT TR 345/230 kV BANDEIRANTES TR3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 448,164.83
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR4 GO RB FT TR 345/230 kV BANDEIRANTES TR4 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 658,767.11
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR5 GO RB FT TR 345/230 kV BANDEIRANTES TR5 GO 062/2001 IPCA RBNI REA 4326/2013 6/1/2016 31/05/2048 2,948,922.40
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TRR2 GO RB FT TR 345/230 kV BANDEIRANTES TRR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,589.04
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TRR2 GO RB FT TR 345/230 kV BANDEIRANTES TRR2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 356,450.14
  BARREIRO 1 EL 345 kV BARREIRO 1 LT 345 kV BARREIRO 1 /PIMENTA C-1 MG RB FT LT 345 kV BARREIRO 1 /PIMENTA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  BARREIRO 1 MC 138 kV TR 345/138 kV BARREIRO 1 TR3 MG RBF FT TR 345/138 kV BARREIRO 1 TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  BARREIRO 1 MC 138 kV TR 345/138 kV BARREIRO 1 TR4 MG RBF FT TR 345/138 kV BARREIRO 1 TR4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  BARREIRO 1 MC 345 kV TR 345/138 kV BARREIRO 1 TR3 MG RBF FT TR 345/138 kV BARREIRO 1 TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,996.14
  BARREIRO 1 MC 345 kV TR 345/138 kV BARREIRO 1 TR4 MG RBF FT TR 345/138 kV BARREIRO 1 TR4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,996.14
  BARREIRO 1 TR 345/138 kV BARREIRO 1 TR3 MG RBF FT TR 345/138 kV BARREIRO 1 TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  BARREIRO 1 TR 345/138 kV BARREIRO 1 TR4 MG RBF FT TR 345/138 kV BARREIRO 1 TR4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  BARREIRO 1 TR 345/138 kV BARREIRO 1 TRR1 MG RBF FT TR 345/138 kV BARREIRO 1 TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,507.69
  BARRO ALTO BC 230 kV 27 Mvar BARRO ALTO BC1 GO RB FT BC 230 kV 27 Mvar BARRO ALTO BC1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 96,867.90
  BARRO ALTO BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO RB FT BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 98,302.13
  BARRO ALTO CE 33/-22 Mvar BARRO ALTO CE1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 586,583.23
  BARRO ALTO CE 33/-22 Mvar BARRO ALTO CE1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 952,177.21
  BARRO ALTO CE 33/-22 Mvar BARRO ALTO CE1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,729,222.51
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 244,073.91
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,360.31
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2037 23,791.07
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RMEL REN 643/2014 17/04/2016 16/04/2044 26,007.00
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RMEL REN 643/2014 16/06/2016 15/06/2044 52,220.57
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RMEL REN 643/2014 21/04/2016 20/04/2044 37,703.29
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RMEL REN 643/2014 7/3/2016 7/2/2044 78,404.52
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBNI REA 3578/2012 5/6/2016 5/5/2044 34,503.52
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,360.31
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 244,073.91

 

133 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO RB FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO 062/2001 IPCA RBNI REA 3218/2011 2/1/2015 31/01/2040 36,849.15
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO RB FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO 062/2001 IPCA RMEL REN 643/2014 29/05/2016 28/05/2044 37,802.20
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO RB FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,360.31
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO RB FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 244,073.91
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO RB FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 699,588.29
  BARRO ALTO EL 69 kV BARRO ALTO  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,594.27
  BARRO ALTO EL 69 kV BARRO ALTO  DIST1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 86,465.01
  BARRO ALTO EL 69 kV BARRO ALTO  DIST1 DIT   062/2001 IPCA RMEL REN 643/2014 20/09/2015 19/09/2042 29,465.37
  BARRO ALTO EL 69 kV BARRO ALTO  DIST1 DIT   062/2001 IPCA RMEL REN 643/2014 20/09/2015 19/09/2042 14,234.48
  BARRO ALTO EL 69 kV BARRO ALTO  DIST2 DIT   062/2001 IPCA RMEL REN 643/2014 10/11/2015 10/10/2043 43,759.58
  BARRO ALTO EL 69 kV BARRO ALTO  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,594.27
  BARRO ALTO EL 69 kV BARRO ALTO  DIST2 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 86,465.01
  BARRO ALTO EL 69 kV BARRO ALTO  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,594.27
  BARRO ALTO EL 69 kV BARRO ALTO  DIST3 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 86,465.01
  BARRO ALTO EL 69 kV BARRO ALTO  DIST3 DIT   062/2001 IPCA RMEL REN 643/2014 10/4/2015 10/3/2043 43,734.47
  BARRO ALTO IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RMEL REN 643/2014 11/1/2015 31/10/2043 27,705.46
  BARRO ALTO IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RMEL REN 643/2014 22/11/2015 21/11/2043 27,742.84
  BARRO ALTO IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 91,639.72
  BARRO ALTO IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 148,755.11
  BARRO ALTO IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 29,220.92
  BARRO ALTO IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 47,142.85
  BARRO ALTO IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 DIT   062/2001 IPCA RMEL REN 643/2014 24/05/2015 23/05/2042 10,946.34
  BARRO ALTO IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 DIT   062/2001 IPCA RMEL REN 643/2014 31/05/2015 30/05/2042 10,952.78
  BARRO ALTO MC 13,8 kV CE 33/-22 Mvar BARRO ALTO CE1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 41,586.30
  BARRO ALTO MC 13,8 kV CE 33/-22 Mvar BARRO ALTO CE1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 67,505.39
  BARRO ALTO MC 13,8 kV CE 33/-22 Mvar BARRO ALTO CE1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 193,490.47
  BARRO ALTO MC 230 kV BC 230 kV 27 Mvar BARRO ALTO BC1 GO RB FT BC 230 kV 27 Mvar BARRO ALTO BC1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,553.05
  BARRO ALTO MC 230 kV BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO RB FT BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,553.05
  BARRO ALTO MC 230 kV RTB 230 kV 15 Mvar BARRO ALTO RT1 GO RB FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 101,770.50
  BARRO ALTO MC 230 kV RTB 230 kV 15 Mvar BARRO ALTO RT1 GO RB FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO 062/2001 IPCA RMEL REN 643/2014 12/6/2015 12/5/2043 101,730.34
  BARRO ALTO MC 230 kV RTB 230 kV 15 Mvar BARRO ALTO RT1 GO RB FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO 062/2001 IPCA RMEL REN 643/2014 27/06/2016 26/06/2047 142,830.72
  BARRO ALTO MC 230 kV TR 230/13,8 kV BARRO ALTO TRC1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RMEL REN 643/2014 11/2/2014 11/1/2041 105,115.00
  BARRO ALTO MC 230 kV TR 230/13,8 kV BARRO ALTO TRC1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 105,830.50
  BARRO ALTO MC 230 kV TR 230/13,8 kV BARRO ALTO TRC1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 171,790.44
  BARRO ALTO MC 230 kV TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 105,830.50
  BARRO ALTO MC 230 kV TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 171,790.44
  BARRO ALTO MC 230 kV TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RMEL REN 643/2014 31/01/2016 30/01/2044 108,671.90
  BARRO ALTO MC 230 kV TR 230/69 kV BARRO ALTO TR2 GO RBF FT TR 230/69 kV BARRO ALTO TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 105,830.50
  BARRO ALTO MC 230 kV TR 230/69 kV BARRO ALTO TR3 GO RBF FT TR 230/69 kV BARRO ALTO TR3 GO 062/2001 IPCA RBNI REA 4276/2013 22/11/2016 21/11/2046 933,369.56
  BARRO ALTO MC 69 kV TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 45,917.66
  BARRO ALTO MC 69 kV TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 74,536.30
  BARRO ALTO MC 69 kV TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RMEL REN 643/2014 18/10/2015 17/10/2043 44,491.34
  BARRO ALTO MC 69 kV TR 230/69 kV BARRO ALTO TR2 GO RBF FT TR 230/69 kV BARRO ALTO TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 45,917.66
  BARRO ALTO MC 69 kV TR 230/69 kV BARRO ALTO TR3 GO RBF FT TR 230/69 kV BARRO ALTO TR3 GO 062/2001 IPCA RBNI REA 4276/2013 22/11/2016 21/11/2046 421,023.98
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,101.07
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 617,002.95
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,768,513.59
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RMEL REN 443/2011 12/8/2017 12/7/2032 13,432.13
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RMEL REN 443/2011 12/8/2017 12/7/2032 12,121.05
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBNI REA 4276/2013 22/11/2016 21/11/2045 201,778.77
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2036 24,389.85
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBNI REA 5861/2016 28/11/2017 27/11/2045 30,080.38
  BARRO ALTO RTB 230 kV 15 Mvar BARRO ALTO RT1 GO RB FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 142,031.06
  BARRO ALTO RTB 230 kV 15 Mvar BARRO ALTO RT1 GO RB FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 230,553.36
  BARRO ALTO TR 230/13,8 kV BARRO ALTO TRC1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 126,418.96
  BARRO ALTO TR 230/13,8 kV BARRO ALTO TRC1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 205,210.87
  BARRO ALTO TR 230/13,8 kV BARRO ALTO TRC1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 588,195.28
  BARRO ALTO TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 263,253.35
  BARRO ALTO TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 427,328.68
  BARRO ALTO TR 230/69 kV BARRO ALTO TR2 GO RBF FT TR 230/69 kV BARRO ALTO TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 263,253.35
  BARRO ALTO TR 230/69 kV BARRO ALTO TR3 GO RBF FT TR 230/69 kV BARRO ALTO TR3 GO 062/2001 IPCA RBNI REA 4276/2013 22/11/2016 21/11/2048 1,171,982.65
  BARRO ALTO TR 230/69 kV BARRO ALTO TRR1 GO RBF FT TR 230/69 kV BARRO ALTO TRR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 88,672.30
  BARRO ALTO TR 230/69 kV BARRO ALTO TRR1 GO RBF FT TR 230/69 kV BARRO ALTO TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 143,938.21
  BARRO BRANCO EL 345 kV BARRO BRANCO LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG RB FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG 062/2001 IPCA RBNI REA 8920/2020 9/1/2017 31/08/2045 127,390.70
  BARRO BRANCO EL 345 kV BARRO BRANCO LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG RB FT LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG 062/2001 IPCA RBNI REA 8920/2020 9/1/2017 31/08/2045 127,390.70
  BARRO BRANCO IB 345 kV MG 345 kV BARRO BRANCO MG1 MG RB FT MG 345 kV BARRO BRANCO MG1 MG 062/2001 IPCA RBNI REA 8920/2020 9/1/2017 31/08/2049 138,360.83
  BARRO BRANCO MG 345 kV BARRO BRANCO MG1 MG RB FT MG 345 kV BARRO BRANCO MG1 MG 062/2001 IPCA RBNI REA 8920/2020 9/1/2017 30/04/2037 45,555.36
  BARRO BRANCO MG 345 kV BARRO BRANCO MG1 MG RB FT MG 345 kV BARRO BRANCO MG1 MG 062/2001 IPCA RBNI REA 8920/2020 9/1/2017 31/08/2048 91,264.42
  BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 2,565,089.23
  BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RMEL REN 443/2011 31/12/2017 30/12/2032 2,360.92
  BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-2 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 2,565,089.23
  BATEIAS IB 500 kV MG 500 kV BATEIAS MG5 PR IB7 RB FT MG 500 kV BATEIAS MG5 PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 2,565,089.23
  BATEIAS RTL 500 kV 165 Mvar BATEIAS RT3 PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 3,248,409.40
  BATEIAS RTL 500 kV 165 Mvar BATEIAS RT4 PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 3,248,409.40
  BRAS. GERAL CS 20/-10 MVAr BRAS. GERAL CS1 DF RBF FT CS 20/-10 MVAr BRAS. GERAL CS1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 528,402.09
  BRAS. GERAL CS 20/-10 MVAr BRAS. GERAL CS2 DF RBF FT CS 20/-10 MVAr BRAS. GERAL CS2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 528,402.09
  BRAS. GERAL EL 230 kV BRAS. GERAL  LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,469.36
  BRAS. GERAL EL 230 kV BRAS. GERAL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,469.36
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,826.78
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST1 DIT   062/2001 IPCA RCDM REA 5012/2015 18/12/2020 18/12/2044 337,303.07
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST10 DIT   062/2001 IPCA RCDM REA 5012/2015 19/03/2020 19/03/2044 337,303.07
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST10 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,826.78
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST10 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 82,000.14
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST10 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 233,582.37
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,826.78
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST2 DIT   062/2001 IPCA RCDM REA 5012/2015 16/12/2020 16/12/2044 337,303.07
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST3 DIT   062/2001 IPCA RCDM REA 5012/2015 28/08/2020 28/08/2044 337,303.07
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,826.78
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,826.78
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST4 DIT   062/2001 IPCA RCDM REA 5012/2015 9/3/2020 9/3/2044 337,303.07
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST5 DIT   062/2001 IPCA RCDM REA 5012/2015 19/03/2020 19/03/2044 337,303.07
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST5 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,826.78
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST6 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,826.78
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST6 DIT   062/2001 IPCA RCDM REA 5012/2015 28/08/2020 28/08/2044 337,303.07
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST7 DIT   062/2001 IPCA RCDM REA 5012/2015 9/3/2020 9/3/2044 337,303.07
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST7 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,826.78
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST8 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,826.78
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST8 DIT   062/2001 IPCA RCDM REA 5012/2015 19/03/2020 19/03/2044 337,303.07
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST9 DIT   062/2001 IPCA RCDM REA 5012/2015 19/03/2020 19/03/2044 337,303.07
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST9 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,826.78
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST9 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 82,000.14
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST9 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 233,582.37
  BRAS. GERAL IB 230 kV MG 230 kV BRAS. GERAL MG1 DF IB2 RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 2367/2010 3/6/2013 3/5/2040 602,112.49
  BRAS. GERAL IB 34,5 kV MG 230 kV BRAS. GERAL MG1 DF IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 29,220.92
  BRAS. GERAL MC 13,8 kV CS 20/-10 MVAr BRAS. GERAL CS1 DF RBF FT CS 20/-10 MVAr BRAS. GERAL CS1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 41,586.30
  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 100,132.78
  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR2 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 100,132.78
  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR4 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 100,132.78
  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR4 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR4 DF 062/2001 IPCA RBNI REA 2367/2010 29/11/2012 28/11/2031 17,569.17
  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 100,132.78

 

134 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 162,541.55
  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 465,892.33
  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TRR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TRR1 DF 062/2001 IPCA RBNI REA 3893/2013 30/07/2014 29/07/2042 818,352.58
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR1 DF 062/2001 IPCA RBNI REA 5012/2015 10/1/2020 10/1/2043 275,851.96
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,665.64
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR2 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,665.64
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR2 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR2 DF 062/2001 IPCA RBNI REA 5012/2015 9/11/2020 9/11/2043 275,851.96
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR3D DF DISPONIVEL RBF FT TR 230/34,5 kV BRAS. GERAL TR3D DF 062/2001 IPCA RBNI REA 5012/2015 21/02/2020 21/02/2043 275,851.96
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR3D DF DISPONIVEL RBF FT TR 230/34,5 kV BRAS. GERAL TR3D DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,665.64
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR4 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,665.64
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR4 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR4 DF 062/2001 IPCA RBNI REA 5012/2015 21/02/2020 21/02/2043 275,851.96
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR4 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR4 DF 062/2001 IPCA RBNI REA 2367/2010 29/11/2012 28/11/2030 32,231.98
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBNI REA 4068/2013 12/7/2017 12/6/2047 33,624.23
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBNI REA 5012/2015 27/01/2020 27/01/2043 178,179.20
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,665.64
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 78,997.00
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 226,428.86
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TRR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TRR1 DF 062/2001 IPCA RBNI REA 3893/2013 30/07/2014 29/07/2033 35,849.52
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 3893/2013 30/07/2014 29/07/2040 196,401.61
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REN 643/2014 29/06/2013 28/06/2036 186,692.72
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 5012/2015 5/6/2021 5/6/2052 358,601.86
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 5012/2015 5/6/2021 5/6/2047 497,610.07
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 383,777.89
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 622,971.37
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,785,620.87
  BRAS. GERAL TR 230/34,5 kV BRAS. GERAL TR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 189,436.96
  BRAS. GERAL TR 230/34,5 kV BRAS. GERAL TR2 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 189,436.96
  BRAS. GERAL TR 230/34,5 kV BRAS. GERAL TR4 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR4 DF 062/2001 IPCA RBNI REA 2367/2010 29/11/2012 28/11/2041 1,046,027.49
  BRAS. GERAL TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 189,436.96
  BRAS. GERAL TR 230/34,5 kV BRAS. GERAL TRR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TRR1 DF 062/2001 IPCA RBNI REA 3231/2011 12/10/2013 12/9/2044 938,850.37
  BRAS. SUL BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 59,022.27
  BRAS. SUL BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 59,022.27
  BRAS. SUL BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 59,022.27
  BRAS. SUL BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 59,022.27
  BRAS. SUL CS 60/-30 MVAr BRAS. SUL CS1 DF RB FT CS 60/-30 MVAr BRAS. SUL CS1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 674,747.83
  BRAS. SUL EL 138 kV BRAS. SUL  DIST1 DIT   062/2001 IPCA RCDM REA 4068/2013 21/08/2017 20/08/2046 43,230.22
  BRAS. SUL EL 138 kV BRAS. SUL  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  BRAS. SUL EL 138 kV BRAS. SUL  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  BRAS. SUL EL 138 kV BRAS. SUL  DIST2 DIT   062/2001 IPCA RMEL REN 443/2011 5/3/2017 5/2/2046 29,684.60
  BRAS. SUL EL 138 kV BRAS. SUL  DIST2 DIT   062/2001 IPCA RMEL REN 443/2011 5/3/2017 5/2/2046 20,482.38
  BRAS. SUL EL 138 kV BRAS. SUL  DIST2 DIT   062/2001 IPCA RMEL REN 443/2011 5/3/2017 5/2/2046 20,482.38
  BRAS. SUL EL 138 kV BRAS. SUL  DIST2 DIT   062/2001 IPCA RCDM REA 4068/2013 5/3/2017 5/2/2046 22,034.22
  BRAS. SUL EL 138 kV BRAS. SUL  DIST2 DIT   062/2001 IPCA RCDM REA 4068/2013 5/3/2017 5/2/2046 22,034.22
  BRAS. SUL EL 138 kV BRAS. SUL  DIST2 DIT   062/2001 IPCA RCDM REA 4068/2013 5/3/2017 5/2/2046 42,935.19
  BRAS. SUL EL 138 kV BRAS. SUL  DIST3 DIT   062/2001 IPCA RCDM REA 4068/2013 8/7/2017 8/6/2046 22,162.75
  BRAS. SUL EL 138 kV BRAS. SUL  DIST3 DIT   062/2001 IPCA RCDM REA 4068/2013 8/7/2017 8/6/2046 22,162.75
  BRAS. SUL EL 138 kV BRAS. SUL  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 26/07/2017 25/07/2046 20,592.71
  BRAS. SUL EL 138 kV BRAS. SUL  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 26/07/2017 25/07/2046 20,592.71
  BRAS. SUL EL 138 kV BRAS. SUL  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 26/07/2017 25/07/2046 29,844.51
  BRAS. SUL EL 138 kV BRAS. SUL  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  BRAS. SUL EL 138 kV BRAS. SUL  DIST4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  BRAS. SUL EL 138 kV BRAS. SUL  DIST4 DIT   062/2001 IPCA RMEL REN 443/2011 4/10/2017 4/9/2046 29,646.26
  BRAS. SUL EL 138 kV BRAS. SUL  DIST4 DIT   062/2001 IPCA RMEL REN 443/2011 4/10/2017 4/9/2046 20,455.92
  BRAS. SUL EL 138 kV BRAS. SUL  DIST4 DIT   062/2001 IPCA RMEL REN 443/2011 4/10/2017 4/9/2046 20,455.92
  BRAS. SUL EL 138 kV BRAS. SUL  DIST4 DIT   062/2001 IPCA RCDM REA 4068/2013 25/04/2017 24/04/2046 22,030.52
  BRAS. SUL EL 138 kV BRAS. SUL  DIST4 DIT   062/2001 IPCA RCDM REA 4068/2013 25/04/2017 24/04/2046 22,030.52
  BRAS. SUL EL 138 kV BRAS. SUL  DIST5 DIT   062/2001 IPCA RCDM REA 4068/2013 24/05/2017 23/05/2046 22,068.81
  BRAS. SUL EL 138 kV BRAS. SUL  DIST5 DIT   062/2001 IPCA RCDM REA 4068/2013 24/05/2017 23/05/2046 22,068.81
  BRAS. SUL EL 138 kV BRAS. SUL  DIST5 DIT   062/2001 IPCA RMEL REN 443/2011 24/05/2017 23/05/2046 20,514.53
  BRAS. SUL EL 138 kV BRAS. SUL  DIST5 DIT   062/2001 IPCA RMEL REN 443/2011 24/05/2017 23/05/2046 20,514.53
  BRAS. SUL EL 138 kV BRAS. SUL  DIST5 DIT   062/2001 IPCA RMEL REN 443/2011 24/05/2017 23/05/2046 29,731.20
  BRAS. SUL EL 138 kV BRAS. SUL  DIST5 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  BRAS. SUL EL 138 kV BRAS. SUL  DIST6 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  BRAS. SUL EL 138 kV BRAS. SUL  DIST6 DIT   062/2001 IPCA RCDM REA 4068/2013 22/12/2016 21/12/2045 42,604.16
  BRAS. SUL EL 138 kV BRAS. SUL  DIST7 DIT   062/2001 IPCA RCDM REA 4068/2013 17/03/2017 16/03/2046 42,825.57
  BRAS. SUL EL 138 kV BRAS. SUL  DIST7 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  BRAS. SUL EL 138 kV BRAS. SUL  DIST7 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  BRAS. SUL EL 138 kV BRAS. SUL  DIST9 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  BRAS. SUL EL 138 kV BRAS. SUL  DIST9 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  BRAS. SUL EL 138 kV BRAS. SUL  DIST9 DIT   062/2001 IPCA RCDM REA 4068/2013 24/10/2018 23/10/2048 27,674.73
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2043 98,306.48
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 4068/2013 11/7/2018 11/6/2048 78,876.48
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF 062/2001 IPCA RBNI REA 4068/2013 11/7/2018 11/6/2032 230.01
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF 062/2001 IPCA RBNI REA 4068/2013 11/7/2018 11/6/2048 78,876.48
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF 062/2001 IPCA RBNI REA 3814/2012 22/04/2014 21/04/2042 894,506.05
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF 062/2001 IPCA RBNI REA 4068/2013 4/6/2015 4/5/2045 55,184.78
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO RB FT LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBNI REA 4347/2013 22/03/2019 21/03/2034 9,874.50
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBNI REA 4347/2013 22/03/2019 21/03/2034 9,874.50
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2036 53,657.09
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 4347/2013 22/03/2019 21/03/2034 9,874.50
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,075,965.79
  BRAS. SUL IB 138 kV MG 345 kV BRAS. SUL MG1 DF IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  BRAS. SUL IB 138 kV MG 345 kV BRAS. SUL MG1 DF IB1 DIT   062/2001 IPCA RCDM REA 4068/2013 21/11/2017 20/11/2047 23,295.13
  BRAS. SUL IB 138 kV MG 345 kV BRAS. SUL MG1 DF IB1 DIT   062/2001 IPCA RCDM REA 4068/2013 21/11/2017 20/11/2047 23,295.13
  BRAS. SUL IB 230 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 91,639.72
  BRAS. SUL IB 230 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 5484/2015 22/04/2019 21/04/2049 79,547.59
  BRAS. SUL IB 345 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  BRAS. SUL IB 345 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 283,511.97
  BRAS. SUL IB 345 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 812,629.45
  BRAS. SUL IB 345 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 4068/2013 30/08/2015 29/08/2046 441,227.04
  BRAS. SUL MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  BRAS. SUL MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  BRAS. SUL MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  BRAS. SUL MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  BRAS. SUL MC 13,8 kV RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  BRAS. SUL MC 13,8 kV RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBNI REA 7761/2019 18/02/2017 17/02/2032 78,840.31
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RMEL REN 443/2011 21/02/2017 20/02/2046 21,249.67
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RMEL REN 443/2011 21/02/2017 20/02/2046 21,249.67
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RMEL REN 443/2011 21/02/2017 20/02/2046 21,249.67
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBNI REA 4068/2013 17/03/2017 16/03/2046 22,753.98

 

135 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBNI REA 4068/2013 17/03/2017 16/03/2046 22,753.98
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBNI REA 4068/2013 17/03/2017 16/03/2046 44,899.38
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RMEL REN 443/2011 4/5/2017 4/4/2046 21,300.48
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RMEL REN 443/2011 4/5/2017 4/4/2046 21,300.48
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RMEL REN 443/2011 4/5/2017 4/4/2046 21,300.48
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RMEL REN 443/2011 4/5/2017 4/4/2046 21,300.48
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RMEL REN 443/2011 4/5/2017 4/4/2046 21,300.48
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034 82,546.93
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 4068/2013 24/10/2018 23/10/2048 9,509.44
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 4068/2013 24/10/2018 23/10/2048 9,509.44
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 4068/2013 24/10/2018 23/10/2048 9,509.44
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 4068/2013 24/10/2018 23/10/2048 9,509.44
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 4068/2013 24/10/2018 23/10/2048 9,509.44
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBNI REA 4068/2013 11/9/2018 11/8/2048 25,882.73
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034 110,665.64
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 135,395.54
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 135,395.54
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 388,083.82
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048 9,737.83
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048 9,737.83
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048 9,737.83
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048 25,939.91
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048 9,737.83
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048 9,737.83
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBNI REA 2367/2010 27/09/2012 26/09/2045 533,536.95
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBNI REA 4068/2013 3/1/2018 29/02/2048 32,042.65
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 135,395.54
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 388,083.82
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR10 DF RB FT TR 345/230 kV BRAS. SUL TR10 DF 062/2001 IPCA RBNI REA 3814/2012 9/2/2014 9/1/2043 593,675.06
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR3 DF RB FT TR 345/230 kV BRAS. SUL TR3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBNI REA 4068/2013 1/4/2018 1/3/2048 59,144.04
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034 83,421.40
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 181,039.34
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR9 DF RB FT TR 345/230 kV BRAS. SUL TR9 DF 062/2001 IPCA RBNI REA 4068/2013 1/8/2018 1/7/2048 59,161.10
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR9 DF RB FT TR 345/230 kV BRAS. SUL TR9 DF 062/2001 IPCA RBNI REA 2367/2010 9/12/2012 9/11/2038 167,814.34
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBNI REA 7761/2019 18/02/2017 17/02/2032 83,008.31
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034 86,910.89
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBNI REA 4068/2013 11/9/2018 11/8/2048 41,808.64
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034 88,742.78
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 915,783.21
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 915,783.21
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048 41,901.00
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBNI REA 2367/2010 27/09/2012 26/09/2040 585,295.65
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 915,783.21
  BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR10 DF RB FT TR 345/230 kV BRAS. SUL TR10 DF 062/2001 IPCA RBNI REA 3814/2012 9/2/2014 9/1/2042 1,300,899.86
  BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR3 DF RB FT TR 345/230 kV BRAS. SUL TR3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBNI REA 4068/2013 1/4/2018 1/3/2048 76,197.36
  BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034 88,742.78
  BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR9 DF RB FT TR 345/230 kV BRAS. SUL TR9 DF 062/2001 IPCA RBNI REA 2367/2010 9/12/2012 9/11/2039 1,630,742.07
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 4347/2013 22/03/2019 21/03/2034 9,874.50
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 2367/2010 9/12/2012 9/11/2031 5,315.27
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 3814/2012 9/2/2014 9/1/2039 598,130.72
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 3,612.14
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031 114,435.41
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031 92,992.04
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031 80,047.70
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RMEL REN 443/2011 12/1/2017 30/11/2032 10,285.90
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,079,968.76
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,753,070.31
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,024,819.89
  BRAS. SUL RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,528.28
  BRAS. SUL RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 187,532.45
  BRAS. SUL RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,528.28
  BRAS. SUL RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 187,532.45
  BRAS. SUL RTL 345 kV 60 Mvar BRAS. SUL RT3 DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,392.31
  BRAS. SUL RTL 345 kV 60 Mvar BRAS. SUL RT3 DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 554,168.56
  BRAS. SUL RTL 345 kV 60 Mvar BRAS. SUL RT3 DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,588,411.58
  BRAS. SUL TR 13,8/345 kV BRAS. SUL TR1 DF RB FT CS 60/-30 MVAr BRAS. SUL CS1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,726.82
  BRAS. SUL TR 13,8/345 kV BRAS. SUL TR1 DF RB FT CS 60/-30 MVAr BRAS. SUL CS1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 359,920.32
  BRAS. SUL TR 13,8/345 kV BRAS. SUL TR1 DF RB FT CS 60/-30 MVAr BRAS. SUL CS1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,031,638.48
  BRAS. SUL TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  BRAS. SUL TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  BRAS. SUL TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  BRAS. SUL TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 835,204.84
  BRAS. SUL TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,393,945.00
  BRAS. SUL TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  BRAS. SUL TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 835,204.84
  BRAS. SUL TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,393,945.00
  BRAS. SUL TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  BRAS. SUL TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 835,204.84
  BRAS. SUL TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,393,945.00
  BRAS. SUL TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  BRAS. SUL TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 835,204.84
  BRAS. SUL TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,393,945.00
  BRAS. SUL TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBNI REA 2367/2010 27/09/2012 26/09/2032 202,876.50
  BRAS. SUL TR 345/138 kV BRAS. SUL TRR1 DF RBF FT TR 345/138 kV BRAS. SUL TRR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,507.69
  BRAS. SUL TR 345/138 kV BRAS. SUL TRR2 DF RBF FT TR 345/138 kV BRAS. SUL TRR2 DF 062/2001 IPCA RBNI REA 3814/2012 30/09/2015 29/09/2046 825,375.55
  BRAS. SUL TR 345/230 kV BRAS. SUL TR10 DF RB FT TR 345/230 kV BRAS. SUL TR10 DF 062/2001 IPCA RBNI REA 3814/2012 9/2/2014 9/1/2044 2,808,383.47
  BRAS. SUL TR 345/230 kV BRAS. SUL TR3 DF RB FT TR 345/230 kV BRAS. SUL TR3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 658,767.11
  BRAS. SUL TR 345/230 kV BRAS. SUL TR3 DF RB FT TR 345/230 kV BRAS. SUL TR3 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,069,350.43
  BRAS. SUL TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 658,767.11
  BRAS. SUL TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,069,350.43
  BRAS. SUL TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,065,075.74

 

136 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  BRAS. SUL TR 345/230 kV BRAS. SUL TR9 DF RB FT TR 345/230 kV BRAS. SUL TR9 DF 062/2001 IPCA RBNI REA 2367/2010 9/12/2012 9/11/2041 2,430,814.97
  BRAS. SUL TR 345/230 kV BRAS. SUL TRR2 DF RB FT TR 345/230 kV BRAS. SUL TRR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,589.04
  BRAS. SUL TR 345/230 kV BRAS. SUL TRR2 DF RB FT TR 345/230 kV BRAS. SUL TRR2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 356,450.14
  C. DOURADA EL 230 kV C. DOURADA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2038 20,396.81
  C. DOURADA EL 230 kV C. DOURADA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RMEL REN 643/2014 30/01/2016 29/01/2047 132,064.20
  C. DOURADA EL 230 kV C. DOURADA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,360.31
  C. DOURADA EL 230 kV C. DOURADA LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,360.31
  C. DOURADA EL 230 kV C. DOURADA LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RMEL REN 643/2014 22/01/2016 21/01/2047 131,986.27
  C. DOURADA EL 230 kV C. DOURADA LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2038 20,396.81
  C. DOURADA MC 138 kV TR  230/138  kV C. DOURADA     TR2 GO RBF FT TR  230/138  kV C. DOURADA     TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  C. DOURADA MC 230 kV TR  230/138  kV C. DOURADA     TR2 GO RBF FT TR  230/138  kV C. DOURADA     TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 105,830.50
  C. DOURADA TR  230/138  kV C. DOURADA     TR2 GO RBF FT TR  230/138  kV C. DOURADA     TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 402,222.26
  C. DOURADA TR  230/138  kV C. DOURADA     TR2 GO RBF FT TR  230/138  kV C. DOURADA     TR2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 652,911.39
  C. DOURADA TR  230/138  kV C. DOURADA     TR2 GO RBF FT TR  230/138  kV C. DOURADA     TR2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,871,437.84
  C. DOURADA TR 230/138 kV C. DOURADA TRR2 GO RBF FT TR 230/138 kV C. DOURADA TRR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,074.09
  C. DOURADA TR 230/138 kV C. DOURADA TRR2 GO RBF FT TR 230/138 kV C. DOURADA TRR2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 217,637.13
  C. DOURADA TR 230/138 kV C. DOURADA TRR2 GO RBF FT TR 230/138 kV C. DOURADA TRR2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 623,812.62
  C. PAULISTA EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  C. PAULISTA EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  C. PAULISTA EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ DIT   062/2001 IPCA RMEL REN 643/2014 29/11/2015 28/11/2043 19,400.55
  C. PAULISTA EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ DIT   062/2001 IPCA RMEL REN 643/2014 12/5/2015 12/4/2043 19,402.87
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP RB FT LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RMEL REN 643/2014 15/01/2016 14/01/2038 41,478.63
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RMEL REN 643/2014 17/11/2015 16/11/2037 41,283.15
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 524,938.95
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG RB FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG RB FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG 062/2001 IPCA RMEL REN 643/2014 11/1/2015 31/10/2037 41,240.40
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ RB FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RMEL REN 443/2011 28/03/2017 27/03/2046 59,925.18
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RMEL REN 443/2011 28/03/2017 27/03/2040 42,866.69
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBNI REA 4347/2013 25/04/2017 24/04/2032 7,943.56
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBNI REA 2040/2009 30/09/2012 29/09/2026 15,917.97
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 643/2014 11/6/2015 11/5/2037 41,237.61
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 524,938.95
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2039 42,544.95
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  C. PAULISTA IB 138 kV MG 500 kV C. PAULISTA MG1 SP IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  C. PAULISTA IB 138 kV MG 500 kV C. PAULISTA MG1 SP IB1 DIT   062/2001 IPCA RMEL REN 643/2014 11/8/2015 11/7/2043 20,378.43
  C. PAULISTA IB 138 kV MG 500 kV C. PAULISTA MG1 SP IB1 DIT   062/2001 IPCA RMEL REN 443/2011 22/11/2015 21/11/2045 19,928.57
  C. PAULISTA IB 500 kV MG 500 kV C. PAULISTA MG1 SP IB1 RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  C. PAULISTA IB 500 kV MG 500 kV C. PAULISTA MG1 SP IB2 RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  C. PAULISTA IB 500 kV MG 500 kV C. PAULISTA MG1 SP IB3 RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  C. PAULISTA MC 138 kV TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  C. PAULISTA MC 138 kV TR 500/138 kV C. PAULISTA TR59 SP RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  C. PAULISTA MC 500 kV RTB 500 kV 136 Mvar C. PAULISTA RT1 SP RB FT RTB 500 kV 136 Mvar C. PAULISTA RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 244,485.40
  C. PAULISTA MC 500 kV RTL 500 kV 136 MVAr C. PAULISTA RT2 SP RB FT RTL 500 kV 136 MVAr C. PAULISTA RT2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,918.57
  C. PAULISTA MC 500 kV TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  C. PAULISTA MC 500 kV TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RMEL REN 643/2014 5/9/2015 5/8/2036 40,615.05
  C. PAULISTA MC 500 kV TR 500/138 kV C. PAULISTA TR59 SP RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  C. PAULISTA MC 500 kV TR 500/138 kV C. PAULISTA TR59 SP RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 463,307.16
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 4347/2013 24/11/2017 23/11/2032 8,108.30
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029 8,461.23
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 699.46
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029 27,768.17
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,292,432.39
  C. PAULISTA RTB 500 kV 136 Mvar C. PAULISTA RT1 SP RB FT RTB 500 kV 136 Mvar C. PAULISTA RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 516,341.85
  C. PAULISTA RTL 500 kV 136 MVAr C. PAULISTA RT2 SP RB FT RTL 500 kV 136 MVAr C. PAULISTA RT2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 516,341.85
  C. PAULISTA TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 883,068.28
  C. PAULISTA TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,433,449.60
  C. PAULISTA TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,108,692.06
  C. PAULISTA TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RMEL REN 643/2014 20/02/2016 19/02/2045 5,829.21
  C. PAULISTA TR 500/138 kV C. PAULISTA TR59 SP RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 883,068.28
  C. PAULISTA TR 500/138 kV C. PAULISTA TR59 SP RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,433,449.60
  C. PAULISTA TR 500/138 kV C. PAULISTA TR59 SP RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,108,692.06
  C. PAULISTA TR 500/138 kV C. PAULISTA TRR1 SP RBF FT TR 500/138 kV C. PAULISTA TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 293,837.66
  C. PAULISTA TR 500/138 kV C. PAULISTA TRR1 SP RBF FT TR 500/138 kV C. PAULISTA TRR1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 476,974.98
  C. PAULISTA TR 500/138 kV C. PAULISTA TRR1 SP RBF FT TR 500/138 kV C. PAULISTA TRR1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,367,151.89
  CAMPINAS BC 345 kV 100 Mvar CAMPINAS BC1 SP RB FT BC 345 kV 100 Mvar CAMPINAS BC1 SP 062/2001 IPCA RBNI REA 5012/2015 20/08/2018 20/08/2038 1,023,621.31
  CAMPINAS BC 345 kV 100 Mvar CAMPINAS BC2 SP RB FT BC 345 kV 100 Mvar CAMPINAS BC2 SP 062/2001 IPCA RBNI REA 5012/2015 20/08/2018 20/08/2038 1,023,621.31
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-1 SP DIT   062/2001 IPCA RMEL REN 643/2014 14/09/2015 13/09/2036 28,961.34
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-1 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 80,780.80
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 80,780.80
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP DIT   062/2001 IPCA RMEL REN 443/2011 8/7/2015 8/6/2036 4,037.66
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP DIT   062/2001 IPCA RMEL REN 443/2011 8/7/2015 8/6/2036 4,037.66
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP DIT   062/2001 IPCA RMEL REN 443/2011 8/7/2015 8/6/2036 4,037.66
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-3 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 80,780.80
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-3 SP DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 130,325.73
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-4 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 80,780.80
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RMEL REN 643/2014 26/02/2014 25/02/2030 17,171.85
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2048 260,104.59
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 22/03/2015 21/03/2045 164,431.26
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048 41,621.63
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048 16,931.27
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048 24,538.08
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048 16,931.27
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048 16,931.27
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048 16,931.27
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2038 25,499.35
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 643/2014 6/1/2014 31/05/2030 48,767.93
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 643/2014 1/11/2016 1/10/2038 29,242.28
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 2040/2009 20/04/2013 19/04/2039 382,418.11
  CAMPINAS EL 500 kV CAMPINAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 643/2014 25/10/2015 24/10/2037 41,211.31
  CAMPINAS EL 500 kV CAMPINAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  CAMPINAS EL 500 kV CAMPINAS LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  CAMPINAS EL 500 kV CAMPINAS LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 643/2014 5/9/2014 5/8/2030 68,392.77
  CAMPINAS EL 500 kV CAMPINAS LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 643/2014 17/11/2015 16/11/2037 41,283.15
  CAMPINAS EL 500 kV CAMPINAS LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  CAMPINAS IB 345 kV MG 500 kV CAMPINAS MG1 SP IB1 RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RMEL REN 643/2014 12/2/2014 12/1/2044 186,291.61
  CAMPINAS IB 345 kV MG 500 kV CAMPINAS MG1 SP IB1 RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  CAMPINAS MC 13,8 kV RTB 13,8 kV 25 MVAr CAMPINAS RT1 SP RBF FT RTB 13,8 kV 25 MVAr CAMPINAS RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  CAMPINAS MC 13,8 kV RTB 13,8 kV 25 MVAr CAMPINAS RT2 SP RBF FT RTB 13,8 kV 25 MVAr CAMPINAS RT2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  CAMPINAS MC 13,8 kV RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP RB FT RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  CAMPINAS MC 13,8 kV RTB 13,8 kV 50 MVAr CAMPINAS RT5 SP RB FT RTB 13,8 kV 50 MVAr CAMPINAS RT5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  CAMPINAS MC 138 kV TR 345/138 kV CAMPINAS TR4 SP RBF FT TR 345/138 kV CAMPINAS TR4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 70,868.78

 

137 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  CAMPINAS MC 138 kV TR 345/138 kV CAMPINAS TR5 SP RBF FT TR 345/138 kV CAMPINAS TR5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 70,868.78
  CAMPINAS MC 345 kV BC 345 kV 100 Mvar CAMPINAS BC1 SP RB FT BC 345 kV 100 Mvar CAMPINAS BC1 SP 062/2001 IPCA RBNI REA 5012/2015 20/08/2018 20/08/2045 1,063,699.02
  CAMPINAS MC 345 kV BC 345 kV 100 Mvar CAMPINAS BC2 SP RB FT BC 345 kV 100 Mvar CAMPINAS BC2 SP 062/2001 IPCA RBNI REA 5012/2015 20/08/2018 20/08/2045 1,063,831.26
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR1 SP RBF FT TR 345/138 kV CAMPINAS TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR1 SP RBF FT TR 345/138 kV CAMPINAS TR1 SP 062/2001 IPCA RMEL REN 643/2014 14/09/2015 13/09/2045 213,830.65
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR1 SP RBF FT TR 345/138 kV CAMPINAS TR1 SP 062/2001 IPCA RMEL REN 643/2014 14/09/2015 13/09/2036 28,961.34
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR2 SP RBF FT TR 345/138 kV CAMPINAS TR2 SP 062/2001 IPCA RMEL REN 643/2014 8/7/2015 8/6/2045 213,280.70
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR2 SP RBF FT TR 345/138 kV CAMPINAS TR2 SP 062/2001 IPCA RMEL REN 643/2014 8/7/2015 8/6/2036 28,865.38
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR2 SP RBF FT TR 345/138 kV CAMPINAS TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 915,783.21
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RMEL REN 643/2014 20/03/2016 19/03/2038 29,406.95
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR4 SP RBF FT TR 345/138 kV CAMPINAS TR4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR5 SP RBF FT TR 345/138 kV CAMPINAS TR5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  CAMPINAS MC 345 kV TR 500/345 kV CAMPINAS TR51 SP RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  CAMPINAS MC 345 kV TR 500/345 kV CAMPINAS TR51 SP RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RMEL REN 643/2014 7/6/2015 7/5/2045 212,824.83
  CAMPINAS MC 345 kV TR 500/345 kV CAMPINAS TR51 SP RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RMEL REN 643/2014 7/8/2015 7/7/2036 28,792.42
  CAMPINAS MC 345 kV TR 500/345 kV CAMPINAS TR54 SP RB FT TR 500/345 kV CAMPINAS TR54 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  CAMPINAS MC 500 kV RTL 500 kV 136 MVAr CAMPINAS RTC2 SP RB FT RTL 500 kV 136 MVAr CAMPINAS RTC2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,918.57
  CAMPINAS MC 500 kV TR 500/345 kV CAMPINAS TR51 SP RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  CAMPINAS MC 500 kV TR 500/345 kV CAMPINAS TR51 SP RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RMEL REN 643/2014 7/8/2015 7/7/2036 40,824.35
  CAMPINAS MC 500 kV TR 500/345 kV CAMPINAS TR54 SP RB FT TR 500/345 kV CAMPINAS TR54 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBNI REA 4347/2013 31/10/2017 30/10/2045 18,725.80
  CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBNI REA 4347/2013 31/10/2017 30/10/2032 8,089.60
  CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBNI REA 5012/2015 20/08/2018 20/08/2050 401,885.26
  CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,280,010.60
  CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,077,790.27
  CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBNI REA 5484/2015 18/12/2018 17/12/2032 13,726.11
  CAMPINAS RTB 13,8 kV 25 MVAr CAMPINAS RT1 SP RBF FT RTB 13,8 kV 25 MVAr CAMPINAS RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,528.28
  CAMPINAS RTB 13,8 kV 25 MVAr CAMPINAS RT2 SP RBF FT RTB 13,8 kV 25 MVAr CAMPINAS RT2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,528.28
  CAMPINAS RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP RB FT RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,101.09
  CAMPINAS RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP RB FT RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 207,941.40
  CAMPINAS RTB 13,8 kV 50 MVAr CAMPINAS RT5 SP RB FT RTB 13,8 kV 50 MVAr CAMPINAS RT5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,101.09
  CAMPINAS RTB 500 kV 45,3 MVAr CAMPINAS RTR1 SP RB FT RTB 500 kV 45,3 MVAr CAMPINAS RTR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,072.49
  CAMPINAS RTL 500 kV 136 MVAr CAMPINAS RTC2 SP RB FT RTL 500 kV 136 MVAr CAMPINAS RTC2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 516,341.85
  CAMPINAS TR 345/138 kV CAMPINAS TR1 SP RBF FT TR 345/138 kV CAMPINAS TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  CAMPINAS TR 345/138 kV CAMPINAS TR2 SP RBF FT TR 345/138 kV CAMPINAS TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  CAMPINAS TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  CAMPINAS TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 835,204.84
  CAMPINAS TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,393,945.00
  CAMPINAS TR 345/138 kV CAMPINAS TR4 SP RBF FT TR 345/138 kV CAMPINAS TR4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  CAMPINAS TR 345/138 kV CAMPINAS TR5 SP RBF FT TR 345/138 kV CAMPINAS TR5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  CAMPINAS TR 345/138 kV CAMPINAS TRR1 SP RBF FT TR 345/138 kV CAMPINAS TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,507.69
  CAMPINAS TR 345/138 kV CAMPINAS TRR1 SP RBF FT TR 345/138 kV CAMPINAS TRR1 SP 062/2001 IPCA RBNIA REA 8707/2020     447,777.72
  CAMPINAS TR 500/345 kV CAMPINAS TR51 SP RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,319,161.14
  CAMPINAS TR 500/345 kV CAMPINAS TR54 SP RB FT TR 500/345 kV CAMPINAS TR54 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,319,161.14
  CAMPINAS TR 500/345 kV CAMPINAS TRR1 SP RB FT TR 500/345 kV CAMPINAS TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 439,976.80
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC3 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC3 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC3 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,523.97
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC4 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC4 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC4 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC4 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,523.97
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC5 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC5 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC5 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC5 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,523.97
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC6 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC6 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC6 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC6 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,523.97
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC7 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC7 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC7 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC7 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,523.97
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC8 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC8 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC8 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC8 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,523.97
  CAMPOS BC 138 kV 25 Mvar CAMPOS BC1-A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 89,235.63
  CAMPOS BC 138 kV 25 MVAr CAMPOS BC1-B RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 89,235.63
  CAMPOS BC 138 kV 25 MVAr CAMPOS BC2-A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 89,235.63
  CAMPOS BC 138 kV 25 MVAr CAMPOS BC2-B RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 89,235.63
  CAMPOS BC 345 kV 60 Mvar CAMPOS BC10 RJ RB FT BC 345 kV 60 Mvar CAMPOS BC10 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,724.64
  CAMPOS BC 345 kV 60 Mvar CAMPOS BC9 RJ RB FT BC 345 kV 60 Mvar CAMPOS BC9 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,724.64
  CAMPOS CE 100/-60 MvAr CAMPOS CE1 RJ RB FT CE 100/-60 MvAr CAMPOS CE1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,825,851.91
  CAMPOS EL 138 kV CAMPOS  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 80,780.80
  CAMPOS EL 138 kV CAMPOS  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 80,780.80
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-1 RJ/ES DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-1 RJ/ES DIT   062/2001 IPCA RCDM REA 1814/2009 1/2/2019 1/1/2049 66,401.84
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-1 RJ/ES DIT   062/2001 IPCA RMEL REN 643/2014 8/2/2015 8/1/2036 12,106.79
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-2 RJ/ES DIT   062/2001 IPCA RMEL REN 443/2011 6/11/2017 6/10/2040 12,748.01
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-2 RJ/ES DIT   062/2001 IPCA RCDM REA 1814/2009 1/2/2019 1/1/2049 9,260.62
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-2 RJ/ES DIT   062/2001 IPCA RCDM REA 1814/2009 1/2/2019 1/1/2049 58,344.13
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-2 RJ/ES DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /IRIRI C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /IRIRI C-2 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 1/2/2019 1/1/2049 66,401.84
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /IRIRI C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 3/10/2015 3/9/2036 11,957.51
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 29/09/2015 28/09/2036 12,171.75
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 1/2/2019 1/1/2049 66,401.84
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 22/03/2017 21/03/2049 113,310.70
  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 11/10/2016 11/9/2045 42,364.33
  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 13/05/2016 5/12/2038 12,390.34
  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 11/2/2015 11/1/2037 12,199.76
  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 4/3/2016 4/2/2047 110,911.82
  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 4/3/2016 4/2/2044 41,754.89
  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBNI REA 2040/2009 4/6/2015 4/5/2036 26,116.32
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RMEL REN 643/2014 25/11/2015 24/11/2046 164,477.56
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBNI REA 2040/2009 4/6/2015 4/5/2036 26,116.32
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 348,065.43
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 997,658.83
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ 006/2005 IGPM RBNI REA 2376/2010 30/11/2012 30/11/2039 89,448.87
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ 006/2005 IGPM RBL CC 006/2005 6/2/2010 3/4/2035 2,740,689.94
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /VIANA C-1 RJ/ES RB FT LT 345 kV CAMPOS /VIANA C-1 RJ/ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /VIANA C-1 RJ/ES RB FT LT 345 kV CAMPOS /VIANA C-1 RJ/ES 062/2001 IPCA RBNI REA 2040/2009 4/6/2015 4/5/2036 26,116.32
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /VIANA C-1 RJ/ES RB FT LT 345 kV CAMPOS /VIANA C-1 RJ/ES 062/2001 IPCA RMEL REN 643/2014 16/09/2015 15/09/2045 163,715.98
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /VITORIA C-1 RJ/ES RB FT LT 345 kV CAMPOS /VITORIA C-1 RJ/ES 062/2001 IPCA RMEL REN 643/2014 16/09/2014 15/09/2043 159,668.24
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /VITORIA C-1 RJ/ES RB FT LT 345 kV CAMPOS /VITORIA C-1 RJ/ES 062/2001 IPCA RBNI REA 2040/2009 4/6/2015 4/5/2036 26,116.32
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /VITORIA C-1 RJ/ES RB FT LT 345 kV CAMPOS /VITORIA C-1 RJ/ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  CAMPOS IB 138 kV MG 345 kV CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,210.67
  CAMPOS IB 138 kV MG 345 kV CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RCDM REA 1814/2009 1/2/2019 1/1/2049 58,344.13
  CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC3 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC4 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC4 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC5 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC5 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00

 

138 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC6 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC6 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC7 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC7 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC8 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC8 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  CAMPOS MC 13,8 kV RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  CAMPOS MC 13,8 kV RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  CAMPOS MC 13,8 kV RTB 13,8 kV 25 Mvar CAMPOS RT3 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  CAMPOS MC 13,8 kV RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  CAMPOS MC 138 kV BC 138 kV 25 Mvar CAMPOS BC1-A RJ DIT   062/2001 IPCA RCDM REA 1814/2009 16/03/2016 15/03/2044 26,846.38
  CAMPOS MC 138 kV BC 138 kV 25 Mvar CAMPOS BC1-A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,446.37
  CAMPOS MC 138 kV BC 138 kV 25 MVAr CAMPOS BC2-A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,446.37
  CAMPOS MC 138 kV BC 138 kV 25 MVAr CAMPOS BC2-A RJ DIT   062/2001 IPCA RCDM REA 1814/2009 24/03/2016 23/03/2044 26,863.53
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RMEL REN 643/2014 26/09/2015 25/09/2036 24,336.10
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBNI REA 1814/2009 1/2/2019 1/1/2049 25,424.05
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBNI REA 4347/2013 29/05/2019 28/05/2053 67,083.86
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 125,613.81
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 360,046.45
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RMEL REN 443/2011 24/01/2014 23/01/2034 3,833.83
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RMEL REN 443/2011 24/01/2014 23/01/2034 3,833.83
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RMEL REN 443/2011 24/01/2014 23/01/2034 3,833.83
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBNI REA 6787/2017 11/5/2018 11/5/2036 212,806.03
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RMEL REN 443/2011 11/3/2016 11/2/2039 4,183.47
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RMEL REN 443/2011 11/3/2016 11/2/2039 4,183.47
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RMEL REN 443/2011 11/3/2016 11/2/2039 4,183.47
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 125,613.81
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 360,046.45
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR4 RJ RBF FT TR 345/138 kV CAMPOS TR4 RJ 062/2001 IPCA RBNI REA 4481/2013 11/9/2017 11/8/2053 1,660,201.79
  CAMPOS MC 345 kV BC 345 kV 60 Mvar CAMPOS BC10 RJ RB FT BC 345 kV 60 Mvar CAMPOS BC10 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,520.01
  CAMPOS MC 345 kV BC 345 kV 60 Mvar CAMPOS BC9 RJ RB FT BC 345 kV 60 Mvar CAMPOS BC9 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,520.01
  CAMPOS MC 345 kV CE 100/-60 MvAr CAMPOS CE1 RJ RB FT CE 100/-60 MvAr CAMPOS CE1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 188,949.42
  CAMPOS MC 345 kV RTL 345 kV 60 MVAr CAMPOS RT5 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 110,704.01
  CAMPOS MC 345 kV RTL 345 kV 60 MVAr CAMPOS RT6 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT6 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 110,704.01
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RMEL REN 643/2014 12/8/2015 12/7/2046 183,777.97
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,877.13
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,877.13
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBNI REA 6787/2017 11/5/2018 11/5/2042 317,185.71
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RMEL REN 643/2014 29/01/2015 28/01/2039 44,610.27
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RMEL REN 643/2014 20/10/2016 19/10/2039 29,887.40
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RMEL REN 643/2014 9/1/2015 31/08/2045 182,653.02
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,877.13
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR4 RJ RBF FT TR 345/138 kV CAMPOS TR4 RJ 062/2001 IPCA RBNI REA 4481/2013 11/9/2017 11/8/2049 1,413,283.29
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 878,797.26
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,426,516.62
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,088,820.07
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBNI REA 4481/2013 11/9/2017 11/8/2047 576,233.46
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBNI REA 6787/2017 11/5/2018 11/5/2050 16,177.15
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBNI REA 5861/2016 21/12/2017 20/12/2045 0.01
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 3,250.13
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBNIA REA 6787/2017     168,961.50
  CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,528.28
  CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 187,532.45
  CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,528.28
  CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 187,532.45
  CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT3 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,528.28
  CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,528.28
  CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 187,532.45
  CAMPOS RTL 345 kV 60 MVAr CAMPOS RT5 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,392.31
  CAMPOS RTL 345 kV 60 MVAr CAMPOS RT5 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 554,168.56
  CAMPOS RTL 345 kV 60 MVAr CAMPOS RT5 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,588,411.58
  CAMPOS RTL 345 kV 60 MVAr CAMPOS RT6 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT6 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,392.31
  CAMPOS RTL 345 kV 60 MVAr CAMPOS RT6 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT6 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 554,168.56
  CAMPOS TR 345/0 kV CAMPOS TRR2 RJ RBF FT TR 345/138 kV CAMPOS TRR2 RJ 062/2001 IPCA RBNI REA 4481/2013 11/9/2017 11/8/2052 849,751.80
  CAMPOS TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  CAMPOS TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,022,166.47
  CAMPOS TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBNI REA 6787/2017 11/5/2018 11/5/2053 2,784,502.02
  CAMPOS TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 404,442.72
  CAMPOS TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 656,515.76
  CAMPOS TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,881,769.05
  CAMPOS TR 345/138 kV CAMPOS TR4 RJ RBF FT TR 345/138 kV CAMPOS TR4 RJ 062/2001 IPCA RBNI REA 4481/2013 11/9/2017 11/8/2051 2,773,565.56
  CAMPOS TR 345/138 kV CAMPOS TRR1 RJ RBF FT TR 345/138 kV CAMPOS TRR1 RJ 062/2001 IPCA RBNI REA 4188/2013 26/05/2017 25/05/2051 831,139.98
  CORUMBA EL 345 kV CORUMBA  LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  CORUMBA EL 345 kV CORUMBA  LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  CORUMBA EL 345 kV CORUMBA  LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,075,965.79
  CORUMBA EL 345 kV CORUMBA  LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 4347/2013 4/9/2018 4/8/2033 15,345.97
  CORUMBA EL 345 kV CORUMBA  LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2030 49,551.73
  CORUMBA EL 345 kV CORUMBA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  CORUMBA EL 345 kV CORUMBA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  CORUMBA EL 345 kV CORUMBA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,075,965.79
  CORUMBA IB 345 kV MG 345 kV CORUMBA MG1 GO IB1 RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  CORUMBA IB 345 kV MG 345 kV CORUMBA MG1 GO IB1 RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 283,511.97
  CORUMBA IB 345 kV MG 345 kV CORUMBA MG1 GO IB1 RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 812,629.45
  CORUMBA MG 345 kV CORUMBA MG1 GO RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2031 12,193.54
  CORUMBA MG 345 kV CORUMBA MG1 GO RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2031 12,193.54
  CORUMBA MG 345 kV CORUMBA MG1 GO RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 421,367.50
  CORUMBA MG 345 kV CORUMBA MG1 GO RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 683,989.10
  CORUMBA MG 345 kV CORUMBA MG1 GO RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,960,515.78
  ESTREITO EL 345 kV ESTREITO LT 345 kV ESTREITO /FURNAS C-1 MG RB FT LT 345 kV ESTREITO /FURNAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  ESTREITO EL 345 kV ESTREITO LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  ESTREITO EL 345 kV ESTREITO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  ESTREITO EL 345 kV ESTREITO LT 345 kV ESTREITO /M. MORAES C-1 MG RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  ESTREITO IB 345 kV MG 345 kV ESTREITO MG1 MG IB1 RB FT MG 345 kV ESTREITO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  ESTREITO MG 345 kV ESTREITO MG1 MG RB FT MG 345 kV ESTREITO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 497,173.14
  F.IGUACU 50HZ BF 500 kV 280,3 Mvar F.IGUACU 50HZ 3-ZRC PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 254,135.78
  F.IGUACU 50HZ BF 500 kV 280,3 Mvar F.IGUACU 50HZ 4-ZRD PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 254,135.78
  F.IGUACU 50HZ BF 500 kV 280,3 Mvar F.IGUACU 50HZ 5-ZRE PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 254,135.78
  F.IGUACU 50HZ BF 500 kV 349 Mvar F.IGUACU 50HZ 1-ZRA PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 267,870.87
  F.IGUACU 50HZ BF 500 kV 349 Mvar F.IGUACU 50HZ 2-ZRB PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 267,870.87
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/05/2017 15/05/2036 2,261.89
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/05/2017 15/05/2036 1,880.47
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/05/2017 15/05/2036 1,880.47
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/05/2017 15/05/2036 1,880.47
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 14,524,043.12
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 41,372,617.95
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 14,524,043.12
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 41,372,617.95
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RMEL REN 443/2011 7/6/2017 7/5/2036 396.48

 

139 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RMEL REN 443/2011 7/6/2017 7/5/2036 396.48
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RMEL REN 443/2011 7/6/2017 7/5/2036 396.48
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RMEL REN 443/2011 7/6/2017 7/5/2036 396.48
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 14,524,043.12
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 41,372,617.95
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV4 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV4 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 14,524,043.12
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV4 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 41,372,617.95
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 14,524,043.12
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 41,372,617.95
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2036 1,786.30
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2036 1,786.30
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2036 1,786.30
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2036 1,786.30
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV6 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV6 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 14,524,043.12
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV6 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 41,372,617.95
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV7 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV7 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 14,524,043.12
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV7 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 41,372,617.95
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV8 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV8 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 14,524,043.12
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV8 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 41,372,617.95
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CVR1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,000,849.82
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CVR2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,000,849.82
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CVR3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,000,849.82
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CVR4 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,000,849.82
  F.IGUACU 50HZ EL 500 kV F.IGUACU 50HZ LT 500 kV ITAIPU 50HZ /F.IGUACU 50HZ C-1 RS/PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 325,681.36
  F.IGUACU 50HZ EL 500 kV F.IGUACU 50HZ LT 500 kV ITAIPU 50HZ /F.IGUACU 50HZ C-2 RS/PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 325,681.36
  F.IGUACU 50HZ EL 500 kV F.IGUACU 50HZ LT 500 kV ITAIPU 50HZ /F.IGUACU 50HZ C-2 RS/PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 525,430.06
  F.IGUACU 50HZ EL 500 kV F.IGUACU 50HZ LT 500 kV MARGEM DIREITA /F.IGUACU 50HZ C-1 RS/PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 325,681.36
  F.IGUACU 50HZ EL 500 kV F.IGUACU 50HZ LT 500 kV MARGEM DIREITA /F.IGUACU 50HZ C-2 RS/PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 325,681.36
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 305,039.44
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 492,127.92
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB10 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 305,039.44
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB11 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 305,039.44
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 305,039.44
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB2 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 492,127.92
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 305,039.44
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 305,039.44
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB5 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 305,039.44
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB6 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 305,039.44
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB7 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 305,039.44
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB8 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 305,039.44
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB9 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 305,039.44
  F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 292,861.35
  F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 472,480.70
  F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC4 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 292,861.35
  F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC4 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 472,480.70
  F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC5 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 292,861.35
  F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC5 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 472,480.70
  F.IGUACU 50HZ MC 500 kV BC 500 kV 349 MVAr F.IGUACU 50HZ BC1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 292,861.35
  F.IGUACU 50HZ MC 500 kV BC 500 kV 349 MVAr F.IGUACU 50HZ BC1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 472,480.70
  F.IGUACU 50HZ MC 500 kV BC 500 kV 349 MVAr F.IGUACU 50HZ BC2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 292,861.35
  F.IGUACU 50HZ MC 500 kV BC 500 kV 349 MVAr F.IGUACU 50HZ BC2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 472,480.70
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 463,740.62
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR4 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR5 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR5 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 463,740.62
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR6 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR6 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 463,740.62
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR7 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 463,740.62
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR DIT   062/2001 IPCA RMEL REN 443/2011 12/2/2016 12/1/2040 11,772.00
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR DIT   062/2001 IPCA RMEL REN 443/2011 12/2/2016 12/1/2040 11,772.00
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR DIT   062/2001 IPCA RMEL REN 443/2011 12/2/2016 12/1/2040 11,772.00
  F.IGUACU 50HZ MG 500 kV F.IGUACU 50HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 11/6/2016 11/5/2040 588.97
  F.IGUACU 50HZ MG 500 kV F.IGUACU 50HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 11/6/2016 11/5/2040 588.97
  F.IGUACU 50HZ MG 500 kV F.IGUACU 50HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 11/6/2016 11/5/2040 588.97
  F.IGUACU 50HZ MG 500 kV F.IGUACU 50HZ MG1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,035,109.26
  F.IGUACU 60HZ EL 500 kV F.IGUACU 60HZ  EL1 RB FT EL 500 kV F.IGUACU 60HZ  EL1 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  F.IGUACU 60HZ EL 500 kV F.IGUACU 60HZ  EL2 RB FT EL 500 kV F.IGUACU 60HZ  EL2 062/2001 IPCA RBNI REA 2069/2009 27/02/2012 26/02/2038 866,409.79
  F.IGUACU 60HZ EL 500 kV F.IGUACU 60HZ  EL3 RB FT EL 500 kV F.IGUACU 60HZ  EL3 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  F.IGUACU 60HZ EL 500 kV F.IGUACU 60HZ  EL4 RB FT EL 500 kV F.IGUACU 60HZ  EL4 062/2001 IPCA RBNI REA 2069/2009 15/06/2012 14/06/2038 939,189.45
  F.IGUACU 60HZ EL 500 kV F.IGUACU 60HZ  EL5 RB FT EL 500 kV F.IGUACU 60HZ  EL5 062/2001 IPCA RBNI REA 2069/2009 6/5/2012 6/4/2040 367,813.89
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RCDM REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 513,791.79
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 828,913.43
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 2,361,210.18
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 513,791.79
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 828,913.43
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 2,361,210.18
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RCDM REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 828,913.43
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 2,361,210.18
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RCDM REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 513,791.79
  F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB1 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB2 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 2069/2009 27/02/2012 26/02/2038 1,086,175.70
  F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB3 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB4 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 2069/2009 15/06/2012 14/06/2039 1,135,208.73
  F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB5 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 2069/2009 6/5/2012 6/4/2039 649,505.89
  F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB7 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 5012/2015 22/04/2019 22/04/2050 1,316,693.94
  F.IGUACU 60HZ IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 543,831.17
  F.IGUACU 60HZ IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 543,831.17
  F.IGUACU 60HZ IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 543,831.17
  F.IGUACU 60HZ IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 543,831.17
  F.IGUACU 60HZ IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB5 DIT   062/2001 IPCA RCDM REA 5012/2015 22/04/2019 22/04/2050 2,383,882.95
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 463,740.62
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 463,740.62
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RCDM REA 2069/2009 27/02/2012 26/02/2038 1,304,667.72
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92

 

140 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 463,740.62
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RCDM REA 2069/2009 15/06/2012 14/06/2038 1,316,261.21
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 463,740.62
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,320,993.28
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RCDM REA 5484/2015 22/04/2019 21/04/2034 86,412.58
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR5 PR DIT   062/2001 IPCA RCDM REA 5012/2015 5/2/2019 5/2/2048 2,735,716.08
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR5 PR DIT   062/2001 IPCA RCDM REA 5012/2015 5/2/2019 5/2/2048 1,930,503.39
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 452,513.92
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 730,052.28
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 2,079,598.21
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 452,513.92
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 730,052.28
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 452,513.92
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 730,052.28
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 2,079,598.21
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 452,513.92
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 730,052.28
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 2,079,598.21
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RCDM REA 5484/2015 22/04/2019 21/04/2034 85,937.77
  F.IGUACU 60HZ MG 500 kV F.IGUACU 60HZ MG1 PR RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 2069/2009 6/5/2012 6/4/2033 839,776.79
  F.IGUACU 60HZ MG 500 kV F.IGUACU 60HZ MG1 PR RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 5012/2015 22/04/2019 22/04/2051 473,212.98
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,810,671.31
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 2,921,202.30
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 8,321,221.96
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RCDM REA 5012/2015 22/04/2019 22/04/2051 479,930.84
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RCDM REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RCDM REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RCDM REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RCDM REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 7,775.85
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 7,775.87
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 7,775.85
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 7,775.85
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 7,775.85
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 1,513.85
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 722,896.84
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 1,166,267.94
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 3,322,184.99
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 3,322,184.99
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 722,896.84
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 1,166,267.94
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 722,896.84
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 1,166,267.94
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 3,322,184.99
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 2,058,103.58
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 3,320,391.10
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 9,458,335.50
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 2,058,103.58
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 3,320,391.10
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 9,458,335.50
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RMEL REN 643/2014 20/03/2016 19/03/2038 6,420.64
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 2,058,103.58
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 3,320,391.10
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 9,458,335.50
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 2,058,103.58
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 3,320,391.10
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 9,458,335.50
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR5 PR DIT   062/2001 IPCA RCDM REA 5012/2015 5/2/2019 5/2/2054 10,538,704.15
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TRR5 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 686,034.53
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TRR5 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 1,106,797.03
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TRR5 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 3,152,778.50
  FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 563,810.12
  FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 563,810.12
  FUNIL IB 138 kV MG 138 kV FUNIL MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  FUNIL IB 138 kV MG 138 kV FUNIL MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 108,655.46
  FUNIL IB 138 kV MG 138 kV FUNIL MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 309,511.68
  FUNIL MG 138 kV FUNIL MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 189,923.05
  FUNIL MG 138 kV FUNIL MG1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 306,407.71
  FUNIL MG 138 kV FUNIL MG1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029 2,180.37
  FURNAS EL 345 kV FURNAS LT 345 kV ESTREITO /FURNAS C-1 MG RB FT LT 345 kV ESTREITO /FURNAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RBNI REA 1814/2009 7/8/2012 7/7/2038 361,508.56
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RBNI REA 1814/2009 30/01/2012 29/01/2037 296,708.52
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /M. MORAES C-1 MG RB FT LT 345 kV FURNAS /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /PIMENTA C-1 MG RB FT LT 345 kV FURNAS /PIMENTA C-1 MG 062/2001 IPCA RBNI REA 1814/2009 4/6/2015 4/5/2045 173,845.20
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /PIMENTA C-1 MG RB FT LT 345 kV FURNAS /PIMENTA C-1 MG 062/2001 IPCA RBNI REA 1814/2009 24/11/2014 23/11/2041 64,967.76
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /PIMENTA C-1 MG RB FT LT 345 kV FURNAS /PIMENTA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RBNI REA 1814/2009 12/2/2012 12/1/2038 366,494.45
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RBNI REA 1814/2009 30/09/2012 29/09/2038 364,384.92
  FURNAS IB 345 kV MG 345 kV FURNAS MG1 MG IB1 RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  FURNAS IB 345 kV MG 345 kV FURNAS MG1 MG IB2 RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  FURNAS IB 345 kV MG 345 kV FURNAS MG1 MG IB2 RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RBNI REA 1814/2009 4/6/2015 4/5/2044 200,233.08
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 198,223.72
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG2 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 198,223.72
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG2 MG DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 319,799.39
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG3 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 198,223.72
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG3 MG DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 319,799.39
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG4 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 198,223.72
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG5 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 198,223.72
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG5 MG DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 319,799.39
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG6 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 198,223.72
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG7 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 198,223.72
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG8 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 198,223.72
  FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 952,006.98
  FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 5,355.91
  FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 7/5/2016 7/4/2029 7,503.83
  FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 7/5/2016 7/4/2029 7,503.83
  FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 7/5/2016 7/4/2029 17,454.29
  FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 7/5/2016 7/4/2029 7,503.83
  FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 7/5/2016 7/4/2029 34,491.95
  GRAJAU CS 200/-150 MVAr GRAJAU CS1 RJ RBF FT CS 200/-150 MVAr GRAJAU CS1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,369,890.13
  GRAJAU CS 200/-150 MVAr GRAJAU CS1 RJ RBF FT CS 200/-150 MVAr GRAJAU CS1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,223,688.13

 

141 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  GRAJAU CS 200/-150 MVAr GRAJAU CS2 RJ RBF FT CS 200/-150 MVAr GRAJAU CS2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,369,890.13
  GRAJAU CS 200/-150 MVAr GRAJAU CS2 RJ RBF FT CS 200/-150 MVAr GRAJAU CS2 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,223,688.13
  GRAJAU EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-1 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 870,105.82
  GRAJAU EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-2 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 870,105.82
  GRAJAU EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-3 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 870,105.82
  GRAJAU EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-4 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2046 870,105.82
  GRAJAU EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-5 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 870,105.82
  GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-1 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,038,549.69
  GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-2 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,038,549.69
  GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-3 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,038,549.69
  GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-4 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,038,549.69
  GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-5 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,038,549.69
  GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-6 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,038,549.69
  GRAJAU EL 138 kV GRAJAU LT 138 kV GRAJAU /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 870,105.82
  GRAJAU EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-1 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,038,549.69
  GRAJAU EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-2 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,038,549.69
  GRAJAU EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-3 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,038,549.69
  GRAJAU EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-4 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,038,549.69
  GRAJAU EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  GRAJAU EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RBNI REA 4347/2013 4/9/2018 4/8/2033 15,345.97
  GRAJAU EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 9/7/2015 9/6/2036 13,678.21
  GRAJAU EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 9/7/2015 9/6/2036 13,678.21
  GRAJAU EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 9/7/2015 9/6/2036 13,678.21
  GRAJAU EL 500 kV GRAJAU LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ RB FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ 062/2001 IPCA RBNI REA 4347/2013 4/9/2018 4/8/2033 8,214.34
  GRAJAU EL 500 kV GRAJAU LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ RB FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  GRAJAU IB 138 kV MG 500 kV GRAJAU MG1 RJ IB1 DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2041 622,693.29
  GRAJAU IB 138 kV MG 500 kV GRAJAU MG1 RJ IB2 DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2041 622,693.29
  GRAJAU IB 500 kV MG 500 kV GRAJAU MG1 RJ IB1 RB FT MG 500 kV GRAJAU MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  GRAJAU MC 13,8 kV CS 200/-150 MVAr GRAJAU CS1 RJ RBF FT CS 200/-150 MVAr GRAJAU CS1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 41,586.30
  GRAJAU MC 13,8 kV CS 200/-150 MVAr GRAJAU CS2 RJ RBF FT CS 200/-150 MVAr GRAJAU CS2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 41,586.30
  GRAJAU MC 138 kV TR 500/138 kV GRAJAU TR52 RJ RBF FT TR 500/138 kV GRAJAU TR52 RJ 062/2001 IPCA RBNI REA 4552/2014 26/02/2018 26/02/2040 875,960.14
  GRAJAU MC 138 kV TR 500/138 kV GRAJAU TR54 RJ RBF FT TR 500/138 kV GRAJAU TR54 RJ 062/2001 IPCA RBNI REA 4552/2014 26/02/2018 26/02/2040 875,960.14
  GRAJAU MC 138 kV TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RBNI REA 4552/2014 26/02/2018 26/02/2040 875,960.14
  GRAJAU MC 138 kV TR 500/138 kV GRAJAU TR58 RJ RBF FT TR 500/138 kV GRAJAU TR58 RJ 062/2001 IPCA RBNI REA 4552/2014 26/02/2018 26/02/2040 875,960.14
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR52 RJ RBF FT TR 500/138 kV GRAJAU TR52 RJ 062/2001 IPCA RBNI REA 4347/2013 4/9/2018 4/8/2033 17,180.82
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR52 RJ RBF FT TR 500/138 kV GRAJAU TR52 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR54 RJ RBF FT TR 500/138 kV GRAJAU TR54 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR54 RJ RBF FT TR 500/138 kV GRAJAU TR54 RJ 062/2001 IPCA RBNI REA 4347/2013 4/9/2018 4/8/2033 15,345.97
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RBNI REA 4347/2013 4/9/2018 4/8/2033 17,180.82
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR58 RJ RBF FT TR 500/138 kV GRAJAU TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR58 RJ RBF FT TR 500/138 kV GRAJAU TR58 RJ 062/2001 IPCA RBNI REA 4347/2013 4/9/2018 4/8/2033 17,180.82
  GRAJAU MG 500 kV GRAJAU MG1 RJ RB FT MG 500 kV GRAJAU MG1 RJ 062/2001 IPCA RBNI REA 4552/2014 26/02/2018 26/02/2055 827,959.24
  GRAJAU MG 500 kV GRAJAU MG1 RJ RB FT MG 500 kV GRAJAU MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2045 2,829.13
  GRAJAU MG 500 kV GRAJAU MG1 RJ RB FT MG 500 kV GRAJAU MG1 RJ 062/2001 IPCA RBNI REA 3178/2011 14/11/2013 13/11/2037 319,382.22
  GRAJAU MG 500 kV GRAJAU MG1 RJ RB FT MG 500 kV GRAJAU MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,014,220.21
  GRAJAU TR 500/138 kV GRAJAU TR52 RJ RBF FT TR 500/138 kV GRAJAU TR52 RJ 062/2001 IPCA RMEL REA 5457/2015 15/09/2015 14/09/2047 4,685,900.69
  GRAJAU TR 500/138 kV GRAJAU TR54 RJ RBF FT TR 500/138 kV GRAJAU TR54 RJ 062/2001 IPCA RMEL REA 5457/2015 20/12/2015 19/12/2048 4,710,426.41
  GRAJAU TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RMEL REA 5457/2015 13/10/2015 10/12/2048 1,564,319.01
  GRAJAU TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 815,193.65
  GRAJAU TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,323,271.42
  GRAJAU TR 500/138 kV GRAJAU TR58 RJ RBF FT TR 500/138 kV GRAJAU TR58 RJ 062/2001 IPCA RMEL REA 5457/2015 11/2/2015 11/1/2048 4,697,663.23
  GRAJAU TR 500/138 kV GRAJAU TRR1 RJ RBF FT TR 500/138 kV GRAJAU TRR1 RJ 062/2001 IPCA RMEL REA 5457/2015 29/04/2016 28/04/2049 1,581,138.37
  GRAJAU TR 500/138 kV GRAJAU TRR2 RJ RBF FT TR 500/138 kV GRAJAU TRR2 RJ 062/2001 IPCA RBNI REA 3178/2011 14/11/2013 13/11/2043 1,448,535.74
  GUARULHOS BC 345 kV 100 Mvar GUARULHOS BC1 SP RB FT BC 345 kV 100 Mvar GUARULHOS BC1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,938.57
  GUARULHOS BC 345 kV 150 Mvar GUARULHOS BC2 SP RB FT BC 345 kV 150 Mvar GUARULHOS BC2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 202,920.72
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 11/4/2015 11/3/2033 36,572.85
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 27/11/2018 26/11/2048 45,725.27
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 4,532.98
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2048 68,997.81
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 4,532.98
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 4,532.98
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,075,965.79
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 5,439.57
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2048 68,997.81
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2048 68,997.81
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 5,439.57
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 5484/2015 10/2/2017 10/1/2047 85,518.44
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBNI REA 5484/2015 10/2/2017 10/1/2047 85,518.44
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 5,439.57
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2040 5,740.20
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-1 SP RB FT LT 345 kV NORTE /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 4,532.98
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-1 SP RB FT LT 345 kV NORTE /GUARULHOS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-1 SP RB FT LT 345 kV NORTE /GUARULHOS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-2 SP RB FT LT 345 kV NORTE /GUARULHOS C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-2 SP RB FT LT 345 kV NORTE /GUARULHOS C-2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-2 SP RB FT LT 345 kV NORTE /GUARULHOS C-2 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 4,532.98
  GUARULHOS IB 345 kV MG 345 kV GUARULHOS MG1 SP IB1 RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  GUARULHOS MC 345 kV BC 345 kV 100 Mvar GUARULHOS BC1 SP RB FT BC 345 kV 100 Mvar GUARULHOS BC1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,520.01
  GUARULHOS MC 345 kV BC 345 kV 150 Mvar GUARULHOS BC2 SP RB FT BC 345 kV 150 Mvar GUARULHOS BC2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,520.01
  GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 4,532.98
  GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 5,439.57
  GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 699.46
  GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBNI REA 5861/2016 21/12/2017 20/12/2034 39,734.01
  GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 648,784.42
  GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,053,145.93
  GURUPI CR 500 kV 161 MVAr GURUPI BC1 TO RB FT CR 500 kV 161 MVAr GURUPI BC1 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 377,684.78
  GURUPI CR 500 kV 161 MVAr GURUPI BC1 TO RB FT CR 500 kV 161 MVAr GURUPI BC1 TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 613,080.67
  GURUPI CR 500 kV 161 MVAr GURUPI BC1 TO RB FT CR 500 kV 161 MVAr GURUPI BC1 TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,757,271.19
  GURUPI CR 500 kV 161 MVAr GURUPI BC1 TO RB FT CR 500 kV 161 MVAr GURUPI BC1 TO 062/2001 IPCA RBNIA REA 6370/2017     10,485,305.05
  GURUPI CR 500 kV 161 Mvar GURUPI BC4D TO RB FT CR 500 kV 161 Mvar GURUPI BC4D TO 062/2001 IGPM RMEL REN 643/2014 10/7/2014 10/6/2029 14,180.21
  GURUPI CR 500 kV 361,5 Mvar GURUPI BC3 TO RB FT CR 500 kV 361,5 Mvar GURUPI BC3 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 377,684.78
  GURUPI CR 500 kV 361,5 Mvar GURUPI BC3 TO RB FT CR 500 kV 361,5 Mvar GURUPI BC3 TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 613,080.67
  GURUPI CR 500 kV 361,5 Mvar GURUPI BC3 TO RB FT CR 500 kV 361,5 Mvar GURUPI BC3 TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,757,271.19
  GURUPI CR 500 kV 361,5 Mvar GURUPI BC3 TO RB FT CR 500 kV 361,5 Mvar GURUPI BC3 TO 062/2001 IPCA RBNIA REA 6370/2017     13,202,559.37
  GURUPI EL 500 kV GURUPI LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  GURUPI EL 500 kV GURUPI LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 524,938.95
  GURUPI EL 500 kV GURUPI LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,504,630.85
  GURUPI EL 500 kV GURUPI LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  GURUPI EL 500 kV GURUPI LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 524,938.95
  GURUPI EL 500 kV GURUPI LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,504,630.85

 

142 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  GURUPI IB 500 kV MG 500 kV GURUPI MG2 TO IB2 RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  GURUPI MC 500 kV CR 500 kV 161 MVAr GURUPI BC1 TO RB FT CR 500 kV 161 MVAr GURUPI BC1 TO 062/2001 IPCA RBNIA REA 6370/2017     341,422.01
  GURUPI MC 500 kV CR 500 kV 361,5 Mvar GURUPI BC3 TO RB FT CR 500 kV 361,5 Mvar GURUPI BC3 TO 062/2001 IPCA RBNIA REA 6370/2017     341,422.01
  GURUPI MC 500 kV RTL 500 kV 136 MVAr GURUPI RMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,918.57
  GURUPI MC 500 kV RTL 500 kV 136 MVAr GURUPI RSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,918.57
  GURUPI MC 69 kV RTN 69 kV 0,5 Mvar GURUPI RTNMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,454.07
  GURUPI MC 69 kV RTN 69 kV 0,5 Mvar GURUPI RTNSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,454.07
  GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,320.45
  GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 792,671.16
  GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,272,030.84
  GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBNI REA 5861/2016 13/09/2017 9/12/2033 39,961.81
  GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031 133,798.57
  GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031 135,675.69
  GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBNIA REA 6370/2017     32,782.92
  GURUPI RTL 500 kV 136 MVAr GURUPI RMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 516,341.85
  GURUPI RTL 500 kV 136 MVAr GURUPI RMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 838,157.17
  GURUPI RTL 500 kV 136 MVAr GURUPI RMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,402,407.24
  GURUPI RTL 500 kV 136 MVAr GURUPI RSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 516,341.85
  GURUPI RTL 500 kV 136 MVAr GURUPI RSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 838,157.17
  GURUPI RTL 500 kV 136 MVAr GURUPI RSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,402,407.24
  GURUPI RTN 69 kV 0,5 Mvar GURUPI RTNMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,501.52
  GURUPI RTN 69 kV 0,5 Mvar GURUPI RTNSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,501.52
  IBIUNA BF 345 kV 220,8 Mvar IBIUNA ZRE SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 227,391.27
  IBIUNA BF 345 kV 220,8 Mvar IBIUNA ZRK SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 227,391.27
  IBIUNA BF 345 kV 220,8 Mvar IBIUNA ZRM SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 227,391.27
  IBIUNA BF 345 kV 237 Mvar IBIUNA ZRA SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 231,608.80
  IBIUNA BF 345 kV 237 Mvar IBIUNA ZRB SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 231,608.80
  IBIUNA BF 345 kV 237 Mvar IBIUNA ZRF SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 231,608.80
  IBIUNA BF 345 kV 237 Mvar IBIUNA ZRH SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 231,608.80
  IBIUNA BF 345 kV 279,8 Mvar IBIUNA ZRC SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 241,497.83
  IBIUNA BF 345 kV 294 Mvar IBIUNA ZRD SP RB FT BF 345 kV 294 Mvar IBIUNA ZRD SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 242,723.55
  IBIUNA BF 345 kV 294 Mvar IBIUNA ZRG SP RB FT BF 345 kV 294 Mvar IBIUNA ZRG SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 242,723.55
  IBIUNA BF 345 kV 296 Mvar IBIUNA ZRN SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 244,910.88
  IBIUNA BF 345 kV 296,3 Mvar IBIUNA ZRL SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 244,910.88
  IBIUNA BF 345 kV 59 Mvar IBIUNA ZRI SP RB FT BF 345 kV 59 Mvar IBIUNA ZRI SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 147,730.54
  IBIUNA BF 345 kV 59 Mvar IBIUNA ZRJ SP RB FT BF 345 kV 59 Mvar IBIUNA ZRJ SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 147,730.54
  IBIUNA CR 500 kV 382 MVAr IBIUNA BC1A SP RB FT CR 500 kV 382 MVAr IBIUNA BC1A SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 11,088,886.91
  IBIUNA CR 500 kV 382 MVAr IBIUNA BC1B SP RB FT CR 500 kV 382 MVAr IBIUNA BC1A SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 11,088,886.91
  IBIUNA CR 500 kV 382 MVAr IBIUNA BC2A SP RB FT CR 500 kV 382 MVAr IBIUNA BC2A SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 11,088,886.91
  IBIUNA CR 500 kV 382 MVAr IBIUNA BC2B SP RB FT CR 500 kV 382 MVAr IBIUNA BC2A SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 11,088,886.91
  IBIUNA CS 330/-220 MVAr IBIUNA CS1 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,863,807.03
  IBIUNA CS 330/-220 MVAr IBIUNA CS1 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,025,443.77
  IBIUNA CS 330/-220 MVAr IBIUNA CS2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,863,807.03
  IBIUNA CS 330/-220 MVAr IBIUNA CS2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,025,443.77
  IBIUNA CS 330/-220 MVAr IBIUNA CS3 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,863,807.03
  IBIUNA CS 330/-220 MVAr IBIUNA CS3 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,025,443.77
  IBIUNA CS 330/-220 MVAr IBIUNA CS4 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,863,807.03
  IBIUNA CS 330/-220 MVAr IBIUNA CS4 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,025,443.77
  IBIUNA CV 600/600 kV IBIUNA CV1 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  IBIUNA CV 600/600 kV IBIUNA CV2 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  IBIUNA CV 600/600 kV IBIUNA CV3 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  IBIUNA CV 600/600 kV IBIUNA CV4 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  IBIUNA CV 600/600 kV IBIUNA CV5 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  IBIUNA CV 600/600 kV IBIUNA CV5 SP DIT   062/2001 IPCA RMEL REN 443/2011 25/05/2017 24/05/2047 2,409.69
  IBIUNA CV 600/600 kV IBIUNA CV6 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  IBIUNA CV 600/600 kV IBIUNA CV7 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  IBIUNA CV 600/600 kV IBIUNA CV8 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 9,002,549.46
  IBIUNA CV 600/600 kV IBIUNA CVR1 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,000,849.82
  IBIUNA CV 600/600 kV IBIUNA CVR2 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,000,849.82
  IBIUNA CV 600/600 kV IBIUNA CVR3 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,000,849.82
  IBIUNA CV 600/600 kV IBIUNA CVR4 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,000,849.82
  IBIUNA EL 345 kV IBIUNA LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  IBIUNA EL 345 kV IBIUNA LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  IBIUNA EL 345 kV IBIUNA LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RMEL REN 643/2014 3/6/2016 3/5/2038 29,366.69
  IBIUNA EL 345 kV IBIUNA LT 345 kV IBIUNA /INTERLAGOS C-1 SP RB FT LT 345 kV IBIUNA /INTERLAGOS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  IBIUNA EL 345 kV IBIUNA LT 345 kV IBIUNA /INTERLAGOS C-2 SP RB FT LT 345 kV IBIUNA /INTERLAGOS C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  IBIUNA EL 345 kV IBIUNA LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  IBIUNA EL 345 kV IBIUNA LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-1 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 2,565,089.23
  IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-1 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBNI REA 5484/2015 3/9/2018 3/8/2042 119,356.21
  IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-2 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBNI REA 5484/2015 3/9/2018 3/8/2042 102,305.32
  IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-2 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 2,565,089.23
  IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB1 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB10 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB11 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB12 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB13 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB14 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB15 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB16 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB17 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB18 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB19 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB2 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB2 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 283,511.97
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB20 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB3 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB3 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 283,511.97
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB4 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB5 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB6 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB7 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB8 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB9 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  IBIUNA IB 500 kV MG 500 kV IBIUNA MG2 SP IB1 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  IBIUNA IB 500 kV MG 500 kV IBIUNA MG2 SP IB2 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  IBIUNA IB 500 kV MG 500 kV IBIUNA MG2 SP IB3 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  IBIUNA IB 500 kV MG 500 kV IBIUNA MG2 SP IB4 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  IBIUNA MC 13,8 kV TR 500/345 kV IBIUNA ATR3 SP RB FT TR 500/345 kV IBIUNA ATR3 SP 034/2001 IGPM RBNI REA 3744/2012 12/9/2015 12/9/2035 120,964.11
  IBIUNA MC 20 kV CS 330/-220 MVAr IBIUNA CS1 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 41,586.30
  IBIUNA MC 20 kV CS 330/-220 MVAr IBIUNA CS2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 41,586.30
  IBIUNA MC 20 kV CS 330/-220 MVAr IBIUNA CS3 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 41,586.30
  IBIUNA MC 20 kV CS 330/-220 MVAr IBIUNA CS4 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 41,586.30
  IBIUNA MC 345 kV BF 345 kV 220,8 Mvar IBIUNA ZRE SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 187,436.61
  IBIUNA MC 345 kV BF 345 kV 220,8 Mvar IBIUNA ZRK SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 187,436.61
  IBIUNA MC 345 kV BF 345 kV 220,8 Mvar IBIUNA ZRM SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 187,436.61
  IBIUNA MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRA SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 187,436.61
  IBIUNA MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRA SP DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 302,396.27
  IBIUNA MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRB SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 187,436.61

 

143 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  IBIUNA MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRF SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 187,436.61
  IBIUNA MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRH SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 187,436.61
  IBIUNA MC 345 kV BF 345 kV 279,8 Mvar IBIUNA ZRC SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 187,436.61
  IBIUNA MC 345 kV BF 345 kV 294 Mvar IBIUNA ZRD SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 187,436.61
  IBIUNA MC 345 kV BF 345 kV 294 Mvar IBIUNA ZRD SP DIT   062/2001 IPCA RMEL REN 643/2014 2/5/2016 2/4/2047 209,136.27
  IBIUNA MC 345 kV BF 345 kV 294 Mvar IBIUNA ZRG SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 187,436.61
  IBIUNA MC 345 kV BF 345 kV 296 Mvar IBIUNA ZRN SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 187,436.61
  IBIUNA MC 345 kV BF 345 kV 296,3 Mvar IBIUNA ZRL SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 187,436.61
  IBIUNA MC 345 kV BF 345 kV 59 Mvar IBIUNA ZRI SP RB FT BF 345 kV 59 Mvar IBIUNA ZRI SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 186,115.34
  IBIUNA MC 345 kV BF 345 kV 59 Mvar IBIUNA ZRJ SP RB FT BF 345 kV 59 Mvar IBIUNA ZRJ SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 186,115.34
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR1 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 181,273.97
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR2 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 181,273.97
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR3 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 181,273.97
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR4 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 181,273.97
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR5 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 181,273.97
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR6 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 181,273.97
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR7 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 181,273.97
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR7 SP DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 292,453.93
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR8 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 181,273.97
  IBIUNA MC 345 kV TR 345/20 kV IBIUNA TRT2 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,996.14
  IBIUNA MC 345 kV TR 345/20 kV IBIUNA TRU2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,996.14
  IBIUNA MC 345 kV TR 345/20 kV IBIUNA TRV2 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,996.14
  IBIUNA MC 345 kV TR 345/20 kV IBIUNA TRW2 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,996.14
  IBIUNA MC 345 kV TR 500/345 kV IBIUNA ATR1 SP RB FT TR 500/345 kV IBIUNA ATR1 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 1,260,754.63
  IBIUNA MC 345 kV TR 500/345 kV IBIUNA ATR2 SP RB FT TR 500/345 kV IBIUNA ATR2 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 1,260,754.63
  IBIUNA MC 345 kV TR 500/345 kV IBIUNA ATR3 SP RB FT TR 500/345 kV IBIUNA ATR3 SP 034/2001 IGPM RBNI REA 3744/2012 12/9/2015 12/9/2042 1,499,684.64
  IBIUNA MC 500 kV RTB 500 kV 180 Mvar IBIUNA RT3 SP RB FT RTB 500 kV 180 Mvar IBIUNA RT3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 267,235.24
  IBIUNA MC 500 kV TR 500/345 kV IBIUNA ATR1 SP RB FT TR 500/345 kV IBIUNA ATR1 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 2,313,823.52
  IBIUNA MC 500 kV TR 500/345 kV IBIUNA ATR2 SP RB FT TR 500/345 kV IBIUNA ATR2 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 2,313,823.52
  IBIUNA MC 500 kV TR 500/345 kV IBIUNA ATR3 SP RB FT TR 500/345 kV IBIUNA ATR3 SP 034/2001 IGPM RBNI REA 3744/2012 12/9/2015 12/9/2043 2,184,700.50
  IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RMEL REN 443/2011 20/06/2016 19/06/2031 6,308.64
  IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RMEL REN 443/2011 20/06/2016 19/06/2031 6,308.64
  IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RMEL REN 443/2011 20/06/2016 19/06/2031 6,308.64
  IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 11,638,232.75
  IBIUNA MG 500 kV IBIUNA MG2 SP RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,550,800.45
  IBIUNA MG 500 kV IBIUNA MG2 SP RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 10,309.82
  IBIUNA MG 500 kV IBIUNA MG2 SP RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBNIA REA 7831/2019     31,179.30
  IBIUNA RTB 500 kV 180 Mvar IBIUNA RT3 SP RB FT RTB 500 kV 180 Mvar IBIUNA RT3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 563,736.13
  IBIUNA RTB 500 kV 60 Mvar IBIUNA RTR1 SP RB FT RTB 500 kV 60 Mvar IBIUNA RTR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 187,912.04
  IBIUNA RTL 500 kV 105 Mvar IBIUNA RTINBC1 SP RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 2,557,939.40
  IBIUNA RTL 500 kV 105 Mvar IBIUNA RTINBC2 SP RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 2,557,939.40
  IBIUNA TR 345/20 kV IBIUNA TR2RES SP RB FT TR 345/20 kV IBIUNA TR2RES SP 062/2001 IPCA RBNIA REA 7831/2019     3,472,715.27
  IBIUNA TR 345/20 kV IBIUNA TRT2 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 438,349.10
  IBIUNA TR 345/20 kV IBIUNA TRT2 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 711,554.64
  IBIUNA TR 345/20 kV IBIUNA TRT2 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,039,526.82
  IBIUNA TR 345/20 kV IBIUNA TRU2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 438,349.10
  IBIUNA TR 345/20 kV IBIUNA TRU2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 711,554.64
  IBIUNA TR 345/20 kV IBIUNA TRU2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,039,526.82
  IBIUNA TR 345/20 kV IBIUNA TRV2 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 438,349.10
  IBIUNA TR 345/20 kV IBIUNA TRV2 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 711,554.64
  IBIUNA TR 345/20 kV IBIUNA TRV2 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,039,526.82
  IBIUNA TR 345/20 kV IBIUNA TRW2 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 438,349.10
  IBIUNA TR 345/20 kV IBIUNA TRW2 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 711,554.64
  IBIUNA TR 345/20 kV IBIUNA TRW2 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,039,526.82
  IBIUNA TR 500/345 kV IBIUNA ATR1 SP RB FT TR 500/345 kV IBIUNA ATR1 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 6,337,139.11
  IBIUNA TR 500/345 kV IBIUNA ATR2 SP RB FT TR 500/345 kV IBIUNA ATR2 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 6,337,139.11
  IBIUNA TR 500/345 kV IBIUNA ATR3 SP RB FT TR 500/345 kV IBIUNA ATR3 SP 034/2001 IGPM RBNI REA 3744/2012 12/9/2015 12/9/2050 6,383,955.29
  IMBARIE EL 138 kV IMBARIE  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  IMBARIE EL 138 kV IMBARIE  DIST1 DIT   062/2001 IPCA RMEL REN 643/2014 24/01/2016 23/01/2044 56,866.08
  IMBARIE EL 138 kV IMBARIE  DIST1 DIT   062/2001 IPCA RMEL REN 643/2014 31/01/2016 30/01/2046 118,547.80
  IMBARIE EL 138 kV IMBARIE  DIST1 DIT   062/2001 IPCA RMEL REN 443/2011 28/01/2017 27/01/2040 4,211.60
  IMBARIE EL 138 kV IMBARIE  DIST1 DIT   062/2001 IPCA RMEL REN 443/2011 28/01/2017 27/01/2040 4,211.60
  IMBARIE EL 138 kV IMBARIE  DIST1 DIT   062/2001 IPCA RMEL REN 443/2011 28/01/2017 27/01/2040 4,211.60
  IMBARIE EL 138 kV IMBARIE  DIST2 DIT   062/2001 IPCA RMEL REN 643/2014 21/11/2016 20/11/2047 211,861.46
  IMBARIE EL 138 kV IMBARIE  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  IMBARIE EL 138 kV IMBARIE  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  IMBARIE EL 138 kV IMBARIE  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2046 23,907.74
  IMBARIE EL 138 kV IMBARIE  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2046 23,907.74
  IMBARIE EL 138 kV IMBARIE  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2046 23,907.74
  IMBARIE EL 138 kV IMBARIE  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2049 97,939.09
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 19/12/2016 18/12/2046 191,460.63
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 8/8/2014 8/7/2038 47,798.03
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2046 23,842.56
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2046 34,554.45
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2040 4,222.78
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2040 4,222.78
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2040 4,222.78
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2049 97,689.79
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2046 23,842.56
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 4/2/2017 4/1/2040 4,228.11
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 4/2/2017 4/1/2040 4,228.11
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 4/2/2017 4/1/2040 4,228.11
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 4/2/2017 4/1/2049 97,797.11
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 4/2/2017 4/1/2046 23,870.08
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 4/2/2017 4/1/2046 23,870.08
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 4/2/2017 4/1/2046 34,594.33
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  IMBARIE IB 138 kV MG 138 kV IMBARIE MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,210.67
  IMBARIE IB 138 kV MG 138 kV IMBARIE MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 443/2011 26/04/2017 25/04/2046 24,644.39
  IMBARIE IB 138 kV MG 138 kV IMBARIE MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 443/2011 26/04/2017 25/04/2046 24,644.39
  IMBARIE IB 138 kV MG 138 kV IMBARIE MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 443/2011 26/04/2017 25/04/2049 102,574.50
  IMBARIE MG 138 kV IMBARIE MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 221,086.64
  IRIRI EL 138 kV IRIRI  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 119,525.81
  IRIRI EL 138 kV IRIRI  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 119,525.81
  IRIRI EL 138 kV IRIRI  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 119,525.81
  IRIRI EL 138 kV IRIRI LT 138 kV CAMPOS /IRIRI C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 119,525.81
  IRIRI EL 138 kV IRIRI LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 119,525.81
  IRIRI IB 138 kV MG 138 kV IRIRI MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  IRIRI MG 138 kV IRIRI MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 213,295.74
  IRIRI MG 138 kV IRIRI MG1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 4,034.98
  ITABERA CR 750 kV 621 Mvar ITABERA BC1A SP RB FT CR 750 kV 621 Mvar ITABERA BC1A SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,258,928.67
  ITABERA CR 750 kV 621 Mvar ITABERA BC1B SP RB FT CR 750 kV 621 Mvar ITABERA BC1B SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,258,928.67
  ITABERA CR 750 kV 621 Mvar ITABERA BC2A SP RB FT CR 750 kV 621 Mvar ITABERA BC2A SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,258,928.67
  ITABERA CR 750 kV 621 Mvar ITABERA BC2B SP RB FT CR 750 kV 621 Mvar ITABERA BC2B SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,258,928.67
  ITABERA CR 750 kV 621 Mvar ITABERA BC3A SP RB FT CR 750 kV 621 Mvar ITABERA BC3A SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,258,928.67
  ITABERA CR 750 kV 621 Mvar ITABERA BC3B SP RB FT CR 750 kV 621 Mvar ITABERA BC3B SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,258,928.67
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBNI REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 510,170.00

 

144 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 828,138.65
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,373,691.19
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 510,170.00
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 828,138.65
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBNI REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBNI REA 5861/2016 18/04/2018 17/04/2038 11,231.76
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBNI REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 510,170.00
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 510,170.00
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 828,138.65
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,373,691.19
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBNI REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBNI REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 510,170.00
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 510,170.00
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBNI REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBNI REA 5861/2016 12/7/2017 12/6/2037 11,116.03
  ITABERA IB 750 kV MG 750 kV ITABERA MG1 SP IB1 RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,997.62
  ITABERA IB 750 kV MG 750 kV ITABERA MG1 SP IB2 RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,997.62
  ITABERA IB 750 kV MG 750 kV ITABERA MG1 SP IB3 RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,997.62
  ITABERA IB 750 kV MG 750 kV ITABERA MG1 SP IB4 RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,997.62
  ITABERA MC 750 kV RTB 750 kV 329 Mvar ITABERA RT1 SP RB FT RTB 750 kV 329 Mvar ITABERA RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 442,814.56
  ITABERA MC 765 kV RTB 765 kV 330 Mvar ITABERA RT2 SP RB FT RTB 765 kV 330 Mvar ITABERA RT2 SP 062/2001 IPCA RBNI REA 5822/2016 8/1/2019 8/1/2048 2,339,943.15
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 5822/2016 8/1/2019 8/1/2050 171,117.33
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 20,000.54
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 10,000.28
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 10,000.28
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 7,538.08
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 7,538.08
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 7,538.08
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 7,538.08
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 10,013.62
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 9,986.92
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 870,876.52
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,413,659.20
  ITABERA RTB 750 kV 110 Mvar ITABERA RTR 2 SP RB FT RTB 750 kV 110 Mvar ITABERA RTR 2 SP 062/2001 IPCA RBNI REA 5822/2016 8/1/2019 8/1/2055 1,222,253.79
  ITABERA RTB 750 kV 329 Mvar ITABERA RT1 SP RB FT RTB 750 kV 329 Mvar ITABERA RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 717,246.83
  ITABERA RTB 750 kV 329 Mvar ITABERA RT1 SP RB FT RTB 750 kV 329 Mvar ITABERA RT1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,164,278.23
  ITABERA RTB 750 kV 329 Mvar ITABERA RT1 SP RB FT RTB 750 kV 329 Mvar ITABERA RT1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,337,167.01
  ITABERA RTB 765 kV 330 Mvar ITABERA RT2 SP RB FT RTB 765 kV 330 Mvar ITABERA RT2 SP 062/2001 IPCA RBNI REA 5822/2016 8/1/2019 8/1/2055 3,666,761.37
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV1 SP RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 717,246.83
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV1 SP RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,164,278.23
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV1 SP RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,337,167.01
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV2 SP RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 717,246.83
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV2 SP RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,164,278.23
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV2 SP RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,337,167.01
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV3 SP RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 717,246.83
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV3 SP RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,164,278.23
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV3 SP RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,337,167.01
  ITAPETI EL 345 kV ITAPETI LT 345 kV ITAPETI /NORDESTE C-1 SP RB FT LT 345 kV ITAPETI /NORDESTE C-1 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 1,962,567.89
  ITAPETI EL 345 kV ITAPETI LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 1,962,567.89
  ITAPETI EL 345 kV ITAPETI LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 1,962,567.89
  ITATIBA EL 500 kV ITATIBA LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBNI REA 6605/2017 7/1/2018 17/06/2041 228,199.94
  ITATIBA EL 500 kV ITATIBA LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBNI REA 6605/2017 7/1/2018 17/06/2041 228,199.94
  ITUMBIARA CR 230 kV 183 Mvar ITUMBIARA BC2 MG RB FT CR 230 kV 183 Mvar ITUMBIARA BC2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 355,515.09
  ITUMBIARA CR 230 kV 33,9 Mvar ITUMBIARA BC1 MG RB FT CR 230 kV 33,9 Mvar ITUMBIARA BC1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 127,320.37
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RMEL REN 643/2014 30/01/2016 29/01/2038 20,396.81
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RBNI REA 1814/2009 7/10/2012 7/9/2039 107,461.35
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBNI REA 1814/2009 14/05/2012 13/05/2039 106,914.10
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RMEL REN 643/2014 31/01/2015 30/01/2036 19,768.52
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 252,491.42
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG RB FT LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG RB FT LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 252,491.42
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG RB FT LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 723,715.35
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 4,756.94
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,075,965.79
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RMEL REN 443/2011 5/5/2014 5/4/2034 28,264.18
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4068/2013 12/6/2015 12/5/2043 34,079.91
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4068/2013 12/7/2015 12/6/2043 34,082.68
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4068/2013 12/8/2015 12/7/2043 49,399.19
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4068/2013 12/9/2015 12/8/2043 34,088.20
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4068/2013 12/5/2015 12/4/2043 34,077.14
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 4,756.94
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 1814/2009 3/5/2012 3/4/2039 150,939.24
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 4,756.94
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4068/2013 23/11/2015 22/11/2043 34,056.42
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4068/2013 23/11/2015 22/11/2043 49,357.14
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4068/2013 28/11/2015 27/11/2043 34,070.29
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4068/2013 22/11/2015 21/11/2043 34,053.64
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4068/2013 24/11/2015 23/11/2043 34,059.20
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034 9,442.73
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034 9,442.73
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034 9,442.73
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 5/6/2014 5/5/2034 28,267.39
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4068/2013 5/4/2016 5/3/2044 34,426.95
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4068/2013 5/4/2016 5/3/2044 34,426.95
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4068/2013 5/4/2016 5/3/2044 34,426.95
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4068/2013 5/4/2016 5/3/2044 49,894.14
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4068/2013 5/4/2016 5/3/2044 34,426.95
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 2040/2009 30/04/2012 29/04/2034 76,926.74
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 1814/2009 31/05/2012 30/05/2039 152,149.47
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 4,756.94
  ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RBNI REA 4347/2013 4/9/2018 4/8/2033 15,345.97
  ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RMEL REN 443/2011 15/10/2014 14/10/2035 40,714.21
  ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58

 

145 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RBNI REA 4347/2013 4/9/2018 4/8/2033 15,345.97
  ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RMEL REN 443/2011 15/09/2014 14/09/2034 40,600.08
  ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  ITUMBIARA IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 1814/2009 4/4/2012 4/3/2039 123,051.03
  ITUMBIARA IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 91,639.72
  ITUMBIARA IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 148,755.11
  ITUMBIARA IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 426,376.29
  ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 1814/2009 23/03/2012 22/03/2039 160,684.29
  ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 4068/2013 22/11/2015 21/11/2043 33,785.11
  ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 4068/2013 24/06/2016 23/06/2044 34,279.76
  ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB2 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB2 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 283,511.97
  ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB2 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 812,629.45
  ITUMBIARA IB 500 kV MG 500 kV ITUMBIARA MG1 MG IB2 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  ITUMBIARA IB 500 kV MG 500 kV ITUMBIARA MG1 MG IB3 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  ITUMBIARA MC 230 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  ITUMBIARA MC 230 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RMEL REN 643/2014 8/10/2015 8/9/2036 20,102.26
  ITUMBIARA MC 230 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 1814/2009 2/12/2012 2/11/2039 119,267.80
  ITUMBIARA MC 230 kV TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  ITUMBIARA MC 230 kV TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 181,039.34
  ITUMBIARA MC 230 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 1814/2009 15/04/2012 14/04/2039 119,962.22
  ITUMBIARA MC 230 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RMEL REN 643/2014 26/07/2015 25/07/2036 20,082.45
  ITUMBIARA MC 230 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 1814/2009 2/12/2012 2/11/2039 170,643.06
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 4,756.94
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RMEL REN 643/2014 8/10/2015 8/9/2036 29,482.85
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 4068/2013 30/01/2016 29/01/2044 36,087.60
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 4068/2013 31/01/2016 30/01/2044 36,090.51
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 4068/2013 2/4/2016 2/3/2044 36,088.52
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 4068/2013 2/4/2016 2/3/2044 36,088.52
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 4068/2013 2/4/2016 2/3/2044 36,088.52
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 4068/2013 2/4/2016 2/3/2044 72,945.86
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 915,783.21
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 4,756.94
  ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 1814/2009 15/04/2012 14/04/2039 171,636.62
  ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 4,756.94
  ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 4068/2013 24/06/2016 23/06/2044 255,848.83
  ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RMEL REN 643/2014 26/07/2015 25/07/2036 29,453.78
  ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 6,273.71
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBNI REA 4068/2013 24/06/2016 23/06/2044 73,654.15
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RMEL REN 443/2011 12/7/2014 12/6/2035 28,852.05
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBNI REA 1814/2009 22/01/2012 21/01/2039 170,311.12
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 6,273.71
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 6,273.71
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RMEL REN 443/2011 10/3/2014 10/2/2035 28,677.13
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBNI REA 4068/2013 24/06/2016 23/06/2044 73,654.15
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG1 MG DIT   062/2001 IPCA RMEL REN 643/2014 31/03/2015 30/03/2036 41,345.62
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG2 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG2 MG DIT   062/2001 IPCA RMEL REN 643/2014 18/01/2015 17/01/2036 41,073.19
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG3 MG DIT   062/2001 IPCA RMEL REN 643/2014 15/10/2015 14/10/2037 42,037.53
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG3 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG4 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG4 MG DIT   062/2001 IPCA RMEL REN 643/2014 23/04/2015 22/04/2036 41,423.82
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG5 MG DIT   062/2001 IPCA RMEL REN 643/2014 28/04/2015 27/04/2036 41,445.53
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG5 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG6 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG6 MG DIT   062/2001 IPCA RMEL REN 643/2014 3/5/2015 3/4/2036 41,232.30
  ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RMEL REN 443/2011 12/7/2014 12/6/2035 40,908.90
  ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 463,307.16
  ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RMEL REN 443/2011 10/3/2014 10/2/2035 40,660.86
  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 5861/2016 13/09/2017 9/12/2033 39,961.81
  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 4326/2013 28/12/2016 27/12/2042 116,768.96
  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 699.46
  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2031 10,340.39
  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,765,940.01
  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,866,580.15
  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 8,216,469.59
  ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCL MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REA 9185/2020 26/10/2020 26/10/2054 414,909.12
  ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCLD MG RB FT RTL 345 kV 96 Mvar ITUMBIARA RTCLD MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 412,914.96
  ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCLD MG RB FT RTL 345 kV 96 Mvar ITUMBIARA RTCLD MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 670,268.42
  ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCLD MG RB FT RTL 345 kV 96 Mvar ITUMBIARA RTCLD MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,921,188.25
  ITUMBIARA RTL 500 kV 111 Mvar ITUMBIARA RTEBIM MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RMEL REA 9185/2020 26/10/2020 26/10/2054 575,245.65
  ITUMBIARA RTL 500 kV 111 Mvar ITUMBIARA RTEBIMD MG RB FT RTL 500 kV 111 Mvar ITUMBIARA RTEBIMD MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 481,996.92
  ITUMBIARA RTL 500 kV 111 Mvar ITUMBIARA RTEBIMD MG RB FT RTL 500 kV 111 Mvar ITUMBIARA RTEBIMD MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 782,406.42
  ITUMBIARA RTL 500 kV 111 Mvar ITUMBIARA RTEBIMD MG RB FT RTL 500 kV 111 Mvar ITUMBIARA RTEBIMD MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,242,609.06
  ITUMBIARA TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 424,806.82
  ITUMBIARA TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RMEL REN 643/2014 8/10/2015 8/9/2044 3,563.01
  ITUMBIARA TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 424,806.82
  ITUMBIARA TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 689,572.01
  ITUMBIARA TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,976,518.07
  ITUMBIARA TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RMEL REN 643/2014 26/07/2015 25/07/2044 3,558.75
  ITUMBIARA TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 424,806.82
  ITUMBIARA TR 345/230 kV ITUMBIARA TRR4 MG RB FT TR 345/230 kV ITUMBIARA TRR4 MG 062/2001 IPCA RBNI REA 4326/2013 28/12/2016 27/12/2049 1,395,079.17
  ITUMBIARA TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,319,161.14
  ITUMBIARA TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,141,341.79
  ITUMBIARA TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,137,721.18
  ITUMBIARA TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,319,161.14
  ITUMBIARA TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,141,341.79
  ITUMBIARA TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,319,161.14
  ITUMBIARA TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,141,341.79
  ITUMBIARA TR 500/345 kV ITUMBIARA TRR1 MG RB FT TR 500/345 kV ITUMBIARA TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 439,976.80
  ITUMBIARA TR 500/345 kV ITUMBIARA TRR1 MG RB FT TR 500/345 kV ITUMBIARA TRR1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 714,196.82
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2040 10,062.93
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2046 32,227.59
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2046 32,227.59
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2046 32,227.59

 

146 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2046 32,227.59
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2046 46,706.65
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2040 10,062.93
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 3/12/2017 3/11/2040 10,062.93
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 4/9/2017 4/8/2046 32,281.74
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 29/04/2017 28/04/2046 46,855.36
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 4/9/2017 4/8/2040 10,082.04
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 4/9/2017 4/8/2040 10,082.04
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 4/9/2017 4/8/2040 10,082.04
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 4/9/2017 4/8/2046 32,281.74
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 4/9/2017 4/8/2046 32,281.74
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 4/9/2017 4/8/2046 32,281.74
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2046 32,261.61
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2046 46,755.95
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2046 32,261.61
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2046 32,261.61
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2040 10,075.77
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2040 10,075.77
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2040 10,075.77
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 27/04/2017 26/04/2046 32,325.36
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2046 32,192.61
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2046 32,192.61
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2046 32,192.61
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2040 10,051.04
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2040 10,051.04
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2040 10,051.04
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2046 32,192.61
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2046 46,655.96
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  ITUTINGA IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RMEL REN 443/2011 23/02/2017 22/02/2046 31,903.53
  ITUTINGA IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RMEL REN 443/2011 24/02/2017 23/02/2046 31,905.95
  ITUTINGA IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  ITUTINGA IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 283,511.97
  ITUTINGA IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 812,629.45
  ITUTINGA MC 345 kV RTB 345 kV 100 Mvar ITUTINGA RB2 MG RB FT RTB 345 kV 100 Mvar ITUTINGA RB2 MG 062/2001 IPCA RBNIA REA 5952/2016     910,259.69
  ITUTINGA MC 345 kV RTB 345 kV 60 Mvar ITUTINGA RT1 MG RB FT RTB 345 kV 60 Mvar ITUTINGA RT1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 157,548.58
  ITUTINGA MG 345 kV ITUTINGA MG1 MG RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBNI REA 5952/2016 8/1/2019 8/1/2051 164,928.57
  ITUTINGA MG 345 kV ITUTINGA MG1 MG RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RMEL REN 443/2011 7/5/2016 7/4/2029 8,010.00
  ITUTINGA MG 345 kV ITUTINGA MG1 MG RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 535,075.96
  ITUTINGA MG 345 kV ITUTINGA MG1 MG RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBNIA REA 5952/2016     62,044.38
  ITUTINGA MG 345 kV ITUTINGA MG1 MG RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBNIA REA 5952/2016     13,926.71
  ITUTINGA RTB 345 kV 100 Mvar ITUTINGA RB2 MG RB FT RTB 345 kV 100 Mvar ITUTINGA RB2 MG 062/2001 IPCA RBNI REA 5952/2016 8/1/2019 8/1/2054 2,106,802.03
  ITUTINGA RTB 345 kV 20 MVAr ITUTINGA RTR1 MG RB FT RTB 345 kV 20 MVAr ITUTINGA RTR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 113,797.44
  ITUTINGA RTB 345 kV 33 Mvar ITUTINGA RB2R MG RB FT RTB 345 kV 100 Mvar ITUTINGA RB2 MG 062/2001 IPCA RBNI REA 5952/2016 8/1/2019 8/1/2054 702,267.36
  ITUTINGA RTB 345 kV 60 Mvar ITUTINGA RT1 MG RB FT RTB 345 kV 60 Mvar ITUTINGA RT1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,392.31
  IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC2A PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,089,258.74
  IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC2B PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,089,258.74
  IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC4A PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,089,258.74
  IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC4B PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,089,258.74
  IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC6A PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,089,258.74
  IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC6B PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,089,258.74
  IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC1A PR RB FT CR 750 kV 528 Mvar IVAIPORA BC1A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,113,840.37
  IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC1B PR RB FT CR 750 kV 528 Mvar IVAIPORA BC1A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,113,840.37
  IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC3A PR RB FT CR 750 kV 528 Mvar IVAIPORA BC3A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,113,840.37
  IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC3B PR RB FT CR 750 kV 528 Mvar IVAIPORA BC3A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,113,840.37
  IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC5A PR RB FT CR 750 kV 528 Mvar IVAIPORA BC5A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,113,840.37
  IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC5B PR RB FT CR 750 kV 528 Mvar IVAIPORA BC5A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,113,840.37
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 513,791.79
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 828,913.43
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 2,361,210.18
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RCDM REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RCDM REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 513,791.79
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 828,913.43
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 2,361,210.18
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 513,791.79
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 828,913.43
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 2,361,210.18
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RCDM REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RCDM REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 510,170.00
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 828,138.65
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,373,691.19
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBNI REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RMEL REN 643/2014 24/11/2016 23/11/2047 268,046.08
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 510,170.00
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 510,170.00
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RMEL REN 643/2014 28/11/2016 27/11/2045 55,751.09
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBNI REA 5861/2016 16/04/2018 15/04/2038 11,230.01
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBNI REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB1 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,997.62
  IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB1 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 643/2014 21/12/2016 20/12/2045 53,550.88
  IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB2 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,997.62
  IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB3 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,997.62
  IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB4 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,997.62
  IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB5 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,997.62
  IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB6 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,997.62
  IVAIPORA MC 500 kV TR 750/500 kV IVAIPORA TR3 PR RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2040 2,189.69
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2040 2,189.69
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2040 2,189.69
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RMEL REN 443/2011 21/01/2017 20/01/2040 2,189.89
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RMEL REN 443/2011 21/01/2017 20/01/2040 2,189.89
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RMEL REN 443/2011 21/01/2017 20/01/2040 2,189.89
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RMEL REN 443/2011 22/01/2017 21/01/2040 2,190.09
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RMEL REN 443/2011 22/01/2017 21/01/2040 2,190.09
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RMEL REN 443/2011 22/01/2017 21/01/2040 2,190.09
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT2A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT2B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT2C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  IVAIPORA MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT3A PR RB FT RTB 69 kV 180 Mvar IVAIPORA RT3A PR 062/2001 IPCA RBNI REA 1266/2008 2/9/2012 2/8/2037 34,373.81
  IVAIPORA MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT3B PR RB FT RTB 69 kV 180 Mvar IVAIPORA RT3B PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  IVAIPORA MC 750 kV RTB 750 kV 329 Mvar IVAIPORA RT7 PR RB FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 442,814.56
  IVAIPORA MC 750 kV RTB 750 kV 329 Mvar IVAIPORA RT7 PR RB FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR 062/2001 IPCA RBNI REA 5484/2015 16/05/2019 15/05/2034 112,970.28
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 449,324.09

 

147 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RBNI REA 5484/2015 24/12/2018 23/12/2033 85,006.83
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 449,324.09
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 729,369.91
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,090,590.66
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBNI REA 5484/2015 24/12/2018 23/12/2033 85,006.83
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR3 PR RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 449,324.09
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR3 PR RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RMEL REN 643/2014 12/2/2016 12/1/2045 61,139.42
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR3 PR RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RMEL REN 643/2014 12/9/2016 12/8/2045 61,146.77
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,106,227.71
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,795,695.41
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,146,996.07
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 699.46
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 7,775.85
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 7,775.85
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 7,775.85
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 7,775.85
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 30,379.97
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,335.61
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 245,657.07
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 704,126.08
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,335.61
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 245,657.07
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 704,126.08
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,335.61
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 245,657.07
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 704,126.08
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,335.61
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 245,657.07
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 704,126.08
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,335.61
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 245,657.07
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 704,126.08
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,335.61
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 245,657.07
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 704,126.08
  IVAIPORA RTB 69 kV 180 Mvar IVAIPORA RT3A PR RB FT RTB 69 kV 180 Mvar IVAIPORA RT3A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,335.61
  IVAIPORA RTB 69 kV 180 Mvar IVAIPORA RT3B PR RB FT RTB 69 kV 180 Mvar IVAIPORA RT3B PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,335.61
  IVAIPORA RTB 69 kV 60 Mvar IVAIPORA RTR1 PR RB FT RTB 69 kV 60 Mvar IVAIPORA RTR1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,408.17
  IVAIPORA RTB 750 kV 329 Mvar IVAIPORA RT7 PR RB FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 717,246.83
  IVAIPORA RTB 750 kV 329 Mvar IVAIPORA RT7 PR RB FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,164,278.23
  IVAIPORA RTB 750 kV 329 Mvar IVAIPORA RT7 PR RB FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,337,167.01
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 259,978.73
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 419,430.32
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,194,772.73
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 259,978.73
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 419,430.32
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,194,772.73
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 259,978.73
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 419,430.32
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,194,772.73
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA1 PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 717,246.83
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA1 PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,164,278.23
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA1 PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,337,167.01
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA2 PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 717,246.83
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA2 PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,164,278.23
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA2 PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,337,167.01
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA3 PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 717,246.83
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA3 PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,164,278.23
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA3 PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,337,167.01
  IVAIPORA TR 500/69 kV IVAIPORA TREG1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,530,471.13
  IVAIPORA TR 500/69 kV IVAIPORA TREG2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,530,471.13
  IVAIPORA TR 500/69 kV IVAIPORA TREG3 PR RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,530,471.13
  IVAIPORA TR 500/69 kV IVAIPORA TREGR1 PR RB FT TR 750/500 kV IVAIPORA TRR1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 510,157.04
  IVAIPORA TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,043,595.70
  IVAIPORA TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,317,287.58
  IVAIPORA TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RMEL REN 443/2011 3/7/2017 3/6/2040 2,196.11
  IVAIPORA TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RMEL REN 443/2011 3/7/2017 3/6/2040 2,196.11
  IVAIPORA TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RMEL REN 443/2011 3/7/2017 3/6/2040 2,196.11
  IVAIPORA TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 9,508,330.88
  IVAIPORA TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,043,595.70
  IVAIPORA TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,317,287.58
  IVAIPORA TR 750/500 kV IVAIPORA TR3 PR RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,043,595.70
  IVAIPORA TR 750/500 kV IVAIPORA TRR1 PR RB FT TR 750/500 kV IVAIPORA TRR1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 681,198.57
  IVAIPORA TR 750/500 kV IVAIPORA TRR1 PR RB FT TR 750/500 kV IVAIPORA TRR1 PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,105,762.53
  JACAREPAGUA BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 163,555.49
  JACAREPAGUA BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 263,868.25
  JACAREPAGUA BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 751,644.70
  JACAREPAGUA BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 163,555.49
  JACAREPAGUA EL 138 kV JACAREPAGUA  CURICICA I DIT   062/2001 IPCA RCDM REN 443/2011 13/12/2016 12/12/2046 851,109.29
  JACAREPAGUA EL 138 kV JACAREPAGUA  CURICICA II DIT   062/2001 IPCA RCDM REN 443/2011 13/12/2016 12/12/2046 866,649.35
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 24/01/2019 24/01/2049 233,813.95
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 3/5/2015 3/4/2036 3,983.72
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 3/5/2015 3/4/2036 3,983.72
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV GRAJAU /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 27/09/2018 27/09/2049 219,114.86
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV GRAJAU /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 14/12/2014 13/12/2035 3,955.47
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 14/12/2014 13/12/2035 3,955.47
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 14/12/2014 13/12/2035 3,955.47
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 9/10/2015 9/9/2044 240,736.99
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 17/12/2018 17/12/2048 83,192.03
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 17/12/2018 17/12/2048 83,192.03
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 9/10/2015 9/9/2044 240,736.99
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035 3,946.75
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035 3,946.75
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035 3,946.75
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 563,810.12
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 9/10/2015 9/9/2042 113,067.81
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 9/10/2015 9/9/2032 18,283.52
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 9/4/2019 9/4/2049 83,192.03

 

148 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035 9,416.38
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035 9,416.38
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035 9,416.38
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 9/10/2015 9/9/2044 281,096.84
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 9/10/2015 9/9/2032 18,283.52
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /MATO ALTO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /MATO ALTO C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 9/10/2015 9/9/2045 115,700.91
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 2/11/2015 2/10/2036 3,976.50
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 2/11/2015 2/10/2036 3,976.50
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 2/11/2015 2/10/2036 3,976.50
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/2/2014 12/1/2035 3,952.30
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/2/2014 12/1/2035 3,952.30
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 11/6/2014 11/5/2035 3,941.19
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 11/6/2014 11/5/2035 3,941.19
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 11/6/2014 11/5/2035 3,941.19
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 3/1/2015 28/02/2042 44,761.47
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 26/07/2015 25/07/2042 32,784.45
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 23/10/2019 23/10/2049 193,367.10
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 16/05/2019 16/05/2049 193,367.10
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 25/01/2015 24/01/2042 44,642.03
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 22/02/2015 21/02/2042 32,416.47
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/3/2014 12/2/2035 3,950.78
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/3/2014 12/2/2035 3,950.78
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/3/2014 12/2/2035 3,950.78
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 1/11/2019 1/11/2050 219,114.86
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 11/10/2014 11/9/2035 3,942.90
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 23/10/2019 23/10/2050 152,088.00
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ZONA OESTE /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  JACAREPAGUA EL 345 kV JACAREPAGUA LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 22,003.90
  JACAREPAGUA EL 345 kV JACAREPAGUA LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  JACAREPAGUA EL 345 kV JACAREPAGUA LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-2 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  JACAREPAGUA EL 345 kV JACAREPAGUA LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-2 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-2 RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 22,003.90
  JACAREPAGUA EL 345 kV JACAREPAGUA LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-2 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-2 RJ 062/2001 IPCA RMEL REN 643/2014 7/12/2015 7/11/2036 28,804.29
  JACAREPAGUA IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  JACAREPAGUA IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  JACAREPAGUA IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  JACAREPAGUA IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB3 DIT   062/2001 IPCA RCDM REA 3578/2012 9/10/2015 9/9/2042 85,783.19
  JACAREPAGUA IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  JACAREPAGUA IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  JACAREPAGUA IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 283,511.97
  JACAREPAGUA IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 812,629.45
  JACAREPAGUA IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 26,835.56
  JACAREPAGUA MC 13,8 kV RTB 13,8 kV 30 MVAr JACAREPAGUA RT1 RJ RBF FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  JACAREPAGUA MC 13,8 kV RTB 13,8 kV 30 MVAr JACAREPAGUA RT2 RJ RBF FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  JACAREPAGUA MC 13,8 kV RTB 13,8 kV 30 MVAr JACAREPAGUA RT3 RJ RBF FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  JACAREPAGUA MC 13,8 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,756.28
  JACAREPAGUA MC 13,8 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,756.28
  JACAREPAGUA MC 13,8 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,756.28
  JACAREPAGUA MC 13,8 kV TR 345/138 kV JACAREPAGUA TR3A RJ RBF FT TR 345/138 kV JACAREPAGUA TR3A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,756.28
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 85,918.78
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RMEL REN 643/2014 2/8/2015 2/7/2042 22,666.21
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RMEL REN 643/2014 12/7/2014 12/6/2041 22,558.05
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RMEL REN 643/2014 21/12/2014 20/12/2041 22,585.34
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RMEL REN 643/2014 4/9/2015 4/8/2042 22,767.26
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 2/8/2015 2/7/2042 32,849.57
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RCDM REA 5710/2016 18/01/2019 18/01/2051 142,964.62
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ DIT   062/2001 IPCA RCDM REA 5710/2016 24/01/2019 24/01/2051 142,964.62
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ DIT   062/2001 IPCA RMEL REN 643/2014 4/10/2015 4/9/2042 22,769.20
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ DIT   062/2001 IPCA RMEL REN 643/2014 4/12/2015 4/11/2042 33,004.41
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,446.37
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBNI REA 5710/2016 16/08/2019 16/08/2050 204,696.91
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBNI REA 5710/2016 10/9/2018 10/9/2049 204,696.91
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 135,395.54
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 388,083.82
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RMEL REN 443/2011 12/6/2015 12/5/2037 9,718.22
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RMEL REN 443/2011 12/6/2015 12/5/2037 9,718.22
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RMEL REN 443/2011 12/6/2015 12/5/2037 9,718.22
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 135,395.54
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 388,083.82
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR3A RJ RBF FT TR 345/138 kV JACAREPAGUA TR3A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 22,313.90
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 915,783.21
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 915,783.21
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 22,313.90
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 22,313.90
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 22,313.90
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RMEL REN 443/2011 15/07/2014 14/07/2034 27,877.40
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RMEL REN 643/2014 22/03/2015 21/03/2042 97,974.50
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR3A RJ RBF FT TR 345/138 kV JACAREPAGUA TR3A RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 26,835.56
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR3A RJ RBF FT TR 345/138 kV JACAREPAGUA TR3A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 786,027.99
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,275,927.95
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,657,188.25
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBNI REA 5710/2016 18/09/2019 18/09/2052 19,890.14
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBNI REN 443/2011 13/12/2016 12/12/2044 94,909.15
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 174,502.40
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 349.73
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RMEL REN 443/2011 10/5/2015 10/4/2028 7,815.18
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RMEL REN 443/2011 10/5/2015 10/4/2028 7,815.18
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2045 95,295.03
  JACAREPAGUA RTB 13,8 kV 30 MVAr JACAREPAGUA RT1 RJ RBF FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 118,835.36
  JACAREPAGUA RTB 13,8 kV 30 MVAr JACAREPAGUA RT2 RJ RBF FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 118,835.36
  JACAREPAGUA RTB 13,8 kV 30 MVAr JACAREPAGUA RT3 RJ RBF FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 118,835.36

 

149 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  JACAREPAGUA TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RMEL REA 5457/2015 27/03/2016 26/03/2049 2,597,206.53
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RMEL REA 5457/2015 12/6/2015 12/5/2048 2,581,425.29
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,022,166.47
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,929,832.51
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TR3A RJ RBF FT TR 345/138 kV JACAREPAGUA TR3A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 317,627.35
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TRR1 RJ RBF FT TR 345/138 kV JACAREPAGUA TRR1 RJ 062/2001 IPCA RMEL REA 5457/2015 4/8/2016 4/7/2049 866,148.14
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TRR2 RJ RBF FT TR 345/138 kV JACAREPAGUA TRR2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,899.90
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBNI REA 1814/2009 5/6/2012 5/5/2037 359,339.75
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBNI REA 1814/2009 2/8/2012 2/7/2037 356,266.37
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 65,723.73
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG 062/2001 IPCA RBNI REA 1814/2009 7/9/2012 7/8/2026 15,795.28
  L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB1 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBNI REA 1814/2009 9/2/2012 9/1/2038 271,575.07
  L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB1 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB2 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB2 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBNI REA 1814/2009 30/06/2012 29/06/2026 47,326.65
  L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB3 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB3 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 283,511.97
  L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB3 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 812,629.45
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR1 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 198,223.72
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR1 SP DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 319,799.39
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR1 SP DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 910,967.97
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR2 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 198,223.72
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR2 SP DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 319,799.39
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR2 SP DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 910,967.97
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR3 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 198,223.72
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR3 SP DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 319,799.39
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR3 SP DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 910,967.97
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR4 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 198,223.72
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR4 SP DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 319,799.39
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR5 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 198,223.72
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR5 SP DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 319,799.39
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR5 SP DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 910,967.97
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR6 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 198,223.72
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR6 SP DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 319,799.39
  L.C.BARRETO MG 500 kV L.C.BARRETO MG1 SP RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 3,479.99
  L.C.BARRETO MG 500 kV L.C.BARRETO MG1 SP RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 7/5/2016 7/4/2029 17,454.29
  L.C.BARRETO MG 500 kV L.C.BARRETO MG1 SP RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 7/5/2016 7/4/2029 19,147.57
  L.C.BARRETO MG 500 kV L.C.BARRETO MG1 SP RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 7/5/2016 7/4/2029 27,404.70
  L.C.BARRETO MG 500 kV L.C.BARRETO MG1 SP RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 876,201.34
  LINHARES EL 138 kV LINHARES  DIST1 DIT   006/2010 IPCA RPEC CC 006/2010 14/08/2018 7/12/2040 395,165.00
  LINHARES EL 138 kV LINHARES  DIST2 DIT   006/2010 IPCA RPEC CC 006/2010 14/08/2018 7/12/2040 395,165.00
  LINHARES EL 138 kV LINHARES  DIST3 DIT   006/2010 IPCA RPEC CC 006/2010 14/08/2018 7/12/2040 395,165.00
  LINHARES EL 138 kV LINHARES  DIST4 DIT   006/2010 IPCA RPEC CC 006/2010 14/08/2018 7/12/2040 395,165.00
  LINHARES EL 230 kV LINHARES LT 230 kV U.MASCARENHAS /LINHARES C-1 ES RB FT LT 230 kV U.MASCARENHAS /LINHARES C-1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 7/12/2040 511,053.04
  LINHARES IB 138 kV MG 230 kV LINHARES MG1 ES IB1 DIT   006/2010 IPCA RPEC CC 006/2010 14/08/2018 7/12/2040 198,120.80
  LINHARES IB 230 kV MG 230 kV LINHARES MG1 ES IB1 RB FT MG 230 kV LINHARES MG1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 7/12/2040 265,366.21
  LINHARES MC 138 kV TR 230/138 kV LINHARES TR1 ES RBF FT TR 230/138 kV LINHARES TR1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 7/12/2040 280,436.43
  LINHARES MC 230 kV TR 230/138 kV LINHARES TR1 ES RBF FT TR 230/138 kV LINHARES TR1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 7/12/2040 360,998.66
  LINHARES MG 230 kV LINHARES MG1 ES RB FT MG 230 kV LINHARES MG1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 7/12/2040 812,821.15
  LINHARES TR 230/138 kV LINHARES TR1 ES RBF FT TR 230/138 kV LINHARES TR1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 7/12/2040 867,114.20
  LINHARES TR 230/138 kV LINHARES TRR1 ES RBF FT TR 230/138 kV LINHARES TRR1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 7/12/2040 289,038.66
  LT  138 kV JACUACANGA   /BRISAMAR      RJ LT 138 kV JACUACANGA /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 492,334.60
  LT  138 kV JACUACANGA   /BRISAMAR      RJ LT 138 kV JACUACANGA /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 794,295.99
  LT  138 kV JACUACANGA   /BRISAMAR      RJ LT 138 kV JACUACANGA /BRISAMAR C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 13/11/2015 11/12/2050 0.01
  LT  138 kV MURIQUI      /BRISAMAR      RJ LT 138 kV MURIQUI /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 191,782.69
  LT  138 kV PALMARES     /MATO ALTO     RJ LT 138 kV PALMARES /MATO ALTO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 145,462.50
  LT  138 kV SANTA CRUZ   /BRISAMAR      RJ LT 138 kV SANTA CRUZ /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 223,788.45
  LT  138 kV SANTA CRUZ   /BRISAMAR      RJ LT 138 kV SANTA CRUZ /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 361,043.63
  LT  138 kV SANTA CRUZ   /BRISAMAR      RJ LT 138 kV SANTA CRUZ /BRISAMAR C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 135,991.36
  LT  138 kV SANTA CRUZ   /PALMARES      RJ LT 138 kV SANTA CRUZ /PALMARES C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 115,775.36
  LT  138 kV SANTA CRUZ   /PALMARES      RJ LT 138 kV SANTA CRUZ /PALMARES C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 115,775.36
  LT  138 kV SANTA CRUZ   /ZONA INDUSTR. RJ LT 138 kV SANTA CRUZ /ZONA INDUSTR. C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 44,794.04
  LT  138 kV SANTA CRUZ   /ZONA INDUSTR. RJ LT 138 kV SANTA CRUZ /ZONA INDUSTR. C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 44,794.04
  LT  138 kV SANTA CRUZ   /ZONA INDUSTR. RJ LT 138 kV SANTA CRUZ /ZONA INDUSTR. C-3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 156,651.92
  LT  230 kV ITUMBIARA    /C. DOURADA    MG/GO LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 553,018.74
  LT  345 kV CORUMBA      /ITUMBIARA     GO/MG LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,721,757.37
  LT  345 kV CORUMBA      /ITUMBIARA     GO/MG LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,676,722.79
  LT  345 kV CORUMBA      /ITUMBIARA     GO/MG LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 7,801,364.54
  LT  345 kV FURNAS       /M. MORAES     MG LT 345 kV FURNAS /M. MORAES C-1 MG RB FT LT 345 kV FURNAS /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,207,331.27
  LT  345 kV FURNAS       /M. MORAES     MG LT 345 kV FURNAS /M. MORAES C-1 MG RB FT LT 345 kV FURNAS /M. MORAES C-1 MG 062/2001 IPCA RBNI REA 2176/2009 12/7/2012 12/6/2040 32,687.92
  LT  345 kV ITUMBIARA    /P. COLOMBIA   MG LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,266,092.16
  LT  345 kV L.C.BARRETO  /VOLTA GRANDE  SP/MG LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 955,095.26
  LT  345 kV MARIMBONDO   /P. COLOMBIA   MG LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG RB FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,634,274.11
  LT  345 kV P. COLOMBIA  /VOLTA GRANDE  MG LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 955,095.26
  LT  500 kV MARIMBONDO   /AGUA VERMELHA MG/SP LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP RB FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,276,866.01
  LT  500 kV MARIMBONDO   /AGUA VERMELHA MG/SP LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP RB FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 8,565,726.59
  LT 138 kV ADRIANOPOLIS /CEPEL RJ LT 138 kV ADRIANOPOLIS /CEPEL C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 13,438.21
  LT 138 kV ADRIANOPOLIS /CEPEL RJ LT 138 kV ADRIANOPOLIS /CEPEL C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 21,680.21
  LT 138 kV ADRIANOPOLIS /CEPEL RJ LT 138 kV ADRIANOPOLIS /CEPEL C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 21,680.21
  LT 138 kV ADRIANOPOLIS /CEPEL RJ LT 138 kV ADRIANOPOLIS /CEPEL C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 13,438.21
  LT 138 kV ADRIANOPOLIS /MAGE RJ LT 138 kV ADRIANOPOLIS /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 330,786.74
  LT 138 kV ADRIANOPOLIS /MAGE RJ LT 138 kV ADRIANOPOLIS /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 330,786.74
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 147,820.32
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 238,482.30
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 696,750.06
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 244,597.24
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,610.59
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 223,788.45
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 361,043.63
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,028,454.69
  LT 138 kV ANGRA AMPLA /MURIQUI RJ LT 138 kV ANGRA AMPLA /MURIQUI C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 322,543.62
  LT 138 kV ANGRA FUR /ANGRA AMPLA RJ LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 380,440.37
  LT 138 kV ANGRA FUR /JACUACANGA RJ LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 380,440.37
  LT 138 kV ANGRA FUR /JACUACANGA RJ LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 613,774.18
  LT 138 kV ANGRA FUR /SANTA CRUZ RJ LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 1,733,009.44
  LT 138 kV ANGRA FUR /SANTA CRUZ RJ LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,074,184.58
  LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,174,889.39
  LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 1,895,479.07
  LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 5,399,387.13
  LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 915,326.48
  LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 1,476,719.60

 

150 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 4,206,525.36
  LT 138 kV CAMPOS /C.ITAPEMIRIM RJ/ES LT 138 kV CAMPOS /C.ITAPEMIRIM C-1 RJ/ES DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 730,487.37
  LT 138 kV CAMPOS /C.ITAPEMIRIM RJ/ES LT 138 kV CAMPOS /C.ITAPEMIRIM C-2 RJ/ES DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 730,487.37
  LT 138 kV CAMPOS /IRIRI RJ LT 138 kV CAMPOS /IRIRI C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,085,374.00
  LT 138 kV CAMPOS /ROCHA LEAO RJ LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,230,836.50
  LT 138 kV IMBARIE /ADRIANOPOLIS RJ LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 201,409.61
  LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 172,604.42
  LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 278,467.12
  LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 793,230.50
  LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 793,230.50
  LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 278,467.12
  LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 172,604.42
  LT 138 kV IRIRI /ROCHA LEAO RJ LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 145,462.50
  LT 138 kV JACAREPAGUA /MATO ALTO RJ LT 138 kV JACAREPAGUA /MATO ALTO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 179,030.76
  LT 138 kV JACAREPAGUA /PALMARES RJ LT 138 kV JACAREPAGUA /PALMARES C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 313,303.84
  LT 138 kV JACAREPAGUA /ZONA INDUSTR. RJ LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 369,250.95
  LT 138 kV PARQUE EMAS /C. MAGALHAES GO/MT LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2046 15,571.11
  LT 138 kV PARQUE EMAS /C. MAGALHAES GO/MT LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 1,146,943.42
  LT 138 kV PARQUE EMAS /C. MAGALHAES GO/MT LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 710,918.77
  LT 138 kV RIO CLARO /PARQUE EMAS GO LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 762,320.99
  LT 138 kV RIO CLARO /PARQUE EMAS GO LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 1,229,871.93
  LT 138 kV RIO CLARO /PARQUE EMAS GO LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2046 15,571.11
  LT 138 kV RIO CLARO /PARQUE EMAS GO LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2046 15,571.11
  LT 138 kV RIO VERDE FUR /C. DOURADA GO LT 138 kV RIO VERDE FUR /C. DOURADA C-2 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,525,544.13
  LT 138 kV RIO VERDE FUR /C. DOURADA GO LT 138 kV RIO VERDE FUR /C. DOURADA C-2 GO DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 2,461,199.33
  LT 138 kV RIO VERDE FUR /RIO CLARO GO LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 1,195,439.67
  LT 138 kV RIO VERDE FUR /RIO CLARO GO LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 740,978.58
  LT 138 kV RIO VERDE FUR /RIO CLARO GO LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2046 15,571.11
  LT 138 kV ROCHA LEAO /MAGE RJ LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 744,270.16
  LT 138 kV ROCHA LEAO /MAGE RJ LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 744,270.16
  LT 138 kV SANTA CRUZ /ZONA OESTE RJ LT 138 kV SANTA CRUZ /ZONA OESTE C-1 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2051 609,579.61
  LT 138 kV SANTA CRUZ /ZONA OESTE RJ LT 138 kV SANTA CRUZ /ZONA OESTE C-1 RJ DIT   062/2001 IPCA RCDM REA 3469/2012 18/06/2016 17/06/2051 2,515,932.01
  LT 138 kV SANTA CRUZ /ZONA OESTE RJ LT 138 kV SANTA CRUZ /ZONA OESTE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 166,771.65
  LT 138 kV SANTA CRUZ /ZONA OESTE RJ LT 138 kV SANTA CRUZ /ZONA OESTE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 166,771.65
  LT 138 kV SANTA CRUZ /ZONA OESTE RJ LT 138 kV SANTA CRUZ /ZONA OESTE C-2 RJ DIT   062/2001 IPCA RCDM REA 3469/2012 19/06/2016 18/06/2051 2,516,095.97
  LT 138 kV SANTA CRUZ /ZONA OESTE RJ LT 138 kV SANTA CRUZ /ZONA OESTE C-2 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2051 609,579.61
  LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 317,003.96
  LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 511,430.58
  LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,456,841.04
  LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,456,841.04
  LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 511,430.58
  LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 317,003.96
  LT 138 kV USI CAMPOS /CAMPOS RJ LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 8,958.81
  LT 138 kV USI CAMPOS /CAMPOS RJ LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 14,453.47
  LT 138 kV USI CAMPOS /CAMPOS RJ LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 8,958.81
  LT 138 kV USI CAMPOS /CAMPOS RJ LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 14,453.47
  LT 138 kV USI CAMPOS /CAMPOS RJ LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 41,171.60
  LT 138 kV ZONA OESTE /JACAREPAGUA RJ LT 138 kV ZONA OESTE /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 95,101.19
  LT 138 kV ZONA OESTE /JACAREPAGUA RJ LT 138 kV ZONA OESTE /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2051 1,076,299.57
  LT 138 kV ZONA OESTE /JACAREPAGUA RJ LT 138 kV ZONA OESTE /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2051 1,076,299.57
  LT 138 kV ZONA OESTE /JACAREPAGUA RJ LT 138 kV ZONA OESTE /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 95,101.19
  LT 230 kV AGUAS LINDAS /BRAS. SUL GO/DF LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,185,925.55
  LT 230 kV AGUAS LINDAS /BRAS. SUL GO/DF LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 762,630.56
  LT 230 kV AGUAS LINDAS /BRAS. SUL GO/DF LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 469,814.12
  LT 230 kV AGUAS LINDAS /BRAS. SUL GO/DF LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2039 7,929.39
  LT 230 kV BARRO ALTO /AGUAS LINDAS GO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,597,368.00
  LT 230 kV BARRO ALTO /AGUAS LINDAS GO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,592,943.90
  LT 230 kV BARRO ALTO /AGUAS LINDAS GO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 7,432,146.88
  LT 230 kV BARRO ALTO /AGUAS LINDAS GO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2039 7,929.39
  LT 230 kV BARRO ALTO /NIQUELANDIA GO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,362,460.94
  LT 230 kV BARRO ALTO /NIQUELANDIA GO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,211,628.62
  LT 230 kV BARRO ALTO /NIQUELANDIA GO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,339,184.11
  LT 230 kV BRAS. GERAL /BRAS. SUL DF LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,070.28
  LT 230 kV BRAS. GERAL /BRAS. SUL DF LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,070.28
  LT 230 kV BRAS. SUL /PIRINEUS DF/GO LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO RB FT LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,344,841.02
  LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,614,270.40
  LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 12,163,535.03
  LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 4,243,641.10
  LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 4,121,228.37
  LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 11,812,663.83
  LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,538,858.75
  LT 230 kV PIRINEUS /XAVANTES GO LT 230 kV PIRINEUS /XAVANTES C-1 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,914,567.41
  LT 230 kV PIRINEUS /XAVANTES GO LT 230 kV PIRINEUS /XAVANTES C-1 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,016,840.74
  LT 230 kV PIRINEUS /XAVANTES GO LT 230 kV PIRINEUS /XAVANTES C-1 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 626,418.82
  LT 230 kV PIRINEUS /XAVANTES GO LT 230 kV PIRINEUS /XAVANTES C-2 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-2 GO 014/2011 IPCA RBL CC 014/2011 6/8/2018 12/9/2041 3,448,609.69
  LT 230 kV RIO VERDE FUR /BARRA PEIXE GO/MT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 17,487,404.43
  LT 230 kV RIO VERDE FUR /BARRA PEIXE GO/MT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 6,101,044.47
  LT 230 kV RIO VERDE FUR /BARRA PEIXE GO/MT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,758,512.93
  LT 230 kV RIO VERDE FUR /C. DOURADA GO LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,199,506.34
  LT 230 kV RIO VERDE FUR /C. DOURADA GO LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,570,371.12
  LT 230 kV RIO VERDE FUR /C. DOURADA GO LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 10,233,743.42
  LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,230,132.17
  LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 5,243,345.01
  LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 15,028,983.19
  LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 14,034,848.11
  LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 4,896,508.96
  LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,016,465.84
  LT 230 kV S.DA MESA /NIQUELANDIA GO LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,319,703.81
  LT 230 kV S.DA MESA /NIQUELANDIA GO LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,142,222.67
  LT 230 kV S.DA MESA /NIQUELANDIA GO LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,140,246.05
  LT 230 kV U.MASCARENHAS /LINHARES ES LT 230 kV U.MASCARENHAS /LINHARES C-1 ES RB FT LT 230 kV U.MASCARENHAS /LINHARES C-1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 7/12/2040 4,390,008.82
  LT 345 kV ADRIANOPOLIS /ITUTINGA RJ/MG LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,223,643.48
  LT 345 kV ADRIANOPOLIS /ITUTINGA RJ/MG LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,223,643.48
  LT 345 kV ADRIANOPOLIS /JACAREPAGUA RJ LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 806,524.89
  LT 345 kV ADRIANOPOLIS /JACAREPAGUA RJ LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-2 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 806,524.89
  LT 345 kV ADRIANOPOLIS /MACAE MERCHAN RJ LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,756,708.02
  LT 345 kV ADRIANOPOLIS /MACAE MERCHAN RJ LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RMEL REN 443/2011 6/5/2017 6/4/2053 0.01
  LT 345 kV ADRIANOPOLIS /VENDA PEDRAS RJ LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBNI REA 5538/2015 7/1/2016 31/12/2042 2,623,803.36
  LT 345 kV ADRIANOPOLIS /VENDA PEDRAS RJ LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,686,430.87
  LT 345 kV ADRIANOPOLIS /VENDA PEDRAS RJ LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,271,004.28
  LT 345 kV ATIBAIA 2 /MOGI CRUZES SP LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 4420/2013 9/10/2013 31/12/2042 207,863.54
  LT 345 kV ATIBAIA 2 /MOGI CRUZES SP LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 3698/2012 18/09/2013 17/09/2045 136,377.27
  LT 345 kV ATIBAIA 2 /MOGI CRUZES SP LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,164,882.59
  LT 345 kV ATIBAIA 2 /POCOS CALDAS SP/MG LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4420/2013 9/10/2013 31/12/2042 207,863.54
  LT 345 kV ATIBAIA 2 /POCOS CALDAS SP/MG LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,164,882.59
  LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,332,221.24
  LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 5,409,062.12
  LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 15,503,977.63
  LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 15,306,474.73
  LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 5,340,156.87

 

151 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,289,772.56
  LT 345 kV BARREIRO 1 /PIMENTA MG LT 345 kV BARREIRO 1 /PIMENTA C-1 MG RB FT LT 345 kV BARREIRO 1 /PIMENTA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,202,419.14
  LT 345 kV BARRO BRANCO /OURO PRETO 2 MG LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG RB FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,689,326.92
  LT 345 kV BARRO BRANCO /OURO PRETO 2 MG LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG RB FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG 062/2001 IPCA RBNI REA 8920/2020 9/1/2017 31/08/2045 10,457.80
  LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 318,365.09
  LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,481,271.75
  LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 516,789.38
  LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 620,147.25
  LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,777,526.10
  LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 382,038.10
  LT 345 kV CAMPINAS /GUARULHOS SP LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,867,741.84
  LT 345 kV CAMPINAS /POCOS CALDAS SP/MG LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,674,266.73
  LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,066,283.62
  LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,888,966.18
  LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,888,966.18
  LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,066,283.62
  LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 8,788,879.04
  LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ 006/2005 IGPM RBL CC 006/2005 6/2/2010 3/4/2035 24,391,295.46
  LT 345 kV CAMPOS /VIANA RJ/ES LT 345 kV CAMPOS /VIANA C-1 RJ/ES RB FT LT 345 kV CAMPOS /VIANA C-1 RJ/ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,223,643.48
  LT 345 kV CAMPOS /VIANA RJ/ES LT 345 kV CAMPOS /VIANA C-1 RJ/ES RB FT LT 345 kV CAMPOS /VIANA C-1 RJ/ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 6,856,072.37
  LT 345 kV CAMPOS /VITORIA RJ/ES LT 345 kV CAMPOS /VITORIA C-1 RJ/ES RB FT LT 345 kV CAMPOS /VITORIA C-1 RJ/ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,754,251.96
  LT 345 kV CAMPOS /VITORIA RJ/ES LT 345 kV CAMPOS /VITORIA C-1 RJ/ES RB FT LT 345 kV CAMPOS /VITORIA C-1 RJ/ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 7,717,388.00
  LT 345 kV CORUMBA /BRAS. SUL GO/DF LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,390,982.13
  LT 345 kV CORUMBA /BRAS. SUL GO/DF LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 8,750,966.75
  LT 345 kV CORUMBA /BRAS. SUL GO/DF LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 25,082,868.27
  LT 345 kV ESTREITO /FURNAS MG LT 345 kV ESTREITO /FURNAS C-1 MG RB FT LT 345 kV ESTREITO /FURNAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,377,125.98
  LT 345 kV ESTREITO /FURNAS MG LT 345 kV ESTREITO /FURNAS C-1 MG RB FT LT 345 kV ESTREITO /FURNAS C-1 MG 062/2001 IPCA RBNI REA 2176/2009 12/7/2012 12/6/2040 29,506.06
  LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 560,322.55
  LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBNI REA 2176/2009 12/7/2012 12/6/2040 116,868.60
  LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBNI REA 2176/2009 12/7/2012 12/6/2040 0.01
  LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 560,322.55
  LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 909,549.30
  LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,607,038.28
  LT 345 kV ESTREITO /M. MORAES MG LT 345 kV ESTREITO /M. MORAES C-1 MG RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBNI REA 2176/2009 12/7/2012 12/6/2040 26,518.80
  LT 345 kV ESTREITO /M. MORAES MG LT 345 kV ESTREITO /M. MORAES C-1 MG RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 331,099.69
  LT 345 kV FURNAS /ITUTINGA MG LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,202,419.14
  LT 345 kV FURNAS /ITUTINGA MG LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,223,643.48
  LT 345 kV FURNAS /PIMENTA MG LT 345 kV FURNAS /PIMENTA C-1 MG RB FT LT 345 kV FURNAS /PIMENTA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,400,806.38
  LT 345 kV FURNAS /POCOS CALDAS MG LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,780,388.42
  LT 345 kV FURNAS /POCOS CALDAS MG LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,780,388.42
  LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,348,864.24
  LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,189,557.64
  LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,275,922.13
  LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,275,922.13
  LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,189,557.64
  LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,348,864.24
  LT 345 kV GUARULHOS /NORDESTE SP LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 700,403.19
  LT 345 kV GUARULHOS /POCOS CALDAS SP/MG LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,862,829.71
  LT 345 kV GUARULHOS /POCOS CALDAS SP/MG LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,905,278.39
  LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,744,531.08
  LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,831,827.88
  LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 8,116,859.29
  LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBNI REA 1410/2008 11/4/2015 11/3/2055 125,088.25
  LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 8,116,859.29
  LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,831,827.88
  LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,744,531.08
  LT 345 kV ITAPETI /NORDESTE SP LT 345 kV ITAPETI /NORDESTE C-1 SP RB FT LT 345 kV ITAPETI /NORDESTE C-1 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 5,102,786.73
  LT 345 kV ITAPETI /TIJUCO PRETO SP LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 2,616,026.77
  LT 345 kV ITAPETI /TIJUCO PRETO SP LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 2,616,026.77
  LT 345 kV ITUMBIARA /BANDEIRANTES MG/GO LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,820,381.04
  LT 345 kV ITUMBIARA /BANDEIRANTES MG/GO LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,820,381.04
  LT 345 kV ITUMBIARA /BANDEIRANTES MG/GO LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 6,201,472.50
  LT 345 kV L.C.BARRETO /POCOS CALDAS SP/MG LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,202,419.14
  LT 345 kV L.C.BARRETO /POCOS CALDAS SP/MG LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,181,194.80
  LT 345 kV MACAE MERCHAN /VENDA PEDRAS RJ LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBNI REA 5538/2015 7/1/2016 31/12/2042 2,623,803.36
  LT 345 kV MACAE MERCHAN /VENDA PEDRAS RJ LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,589,369.37
  LT 345 kV MACAE MERCHAN /VENDA PEDRAS RJ LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 4,203,220.25
  LT 345 kV MOGI CRUZES /NORDESTE SP LT 345 kV MOGI CRUZES /NORDESTE C-1 SP RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 466,935.46
  LT 345 kV PADRE FIALHO /BARRO BRANCO MG LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG RB FT LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG 062/2001 IPCA RBNI REA 8920/2020 9/1/2017 31/08/2045 10,457.80
  LT 345 kV PADRE FIALHO /BARRO BRANCO MG LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG RB FT LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,689,326.92
  LT 345 kV VIANA /VITORIA ES LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 985,345.07
  LT 345 kV VIANA /VITORIA ES LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 607,016.10
  LT 345 kV VITORIA /PADRE FIALHO ES/MG LT 345 kV VITORIA /PADRE FIALHO C-1 ES/MG RB FT LT 345 kV VITORIA /PADRE FIALHO C-1 ES/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,750,268.03
  LT 500 kV ADRIANOPOLIS /C. PAULISTA RJ/SP LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP RB FT LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,445,603.00
  LT 500 kV ADRIANOPOLIS /GRAJAU RJ LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,037,072.17
  LT 500 kV ADRIANOPOLIS /GRAJAU RJ LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,306,698.19
  LT 500 kV ADRIANOPOLIS /SAO JOSE RJ LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,222,243.30
  LT 500 kV ADRIANOPOLIS /SAO JOSE RJ LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,984,018.92
  LT 500 kV ADRIANOPOLIS /SAO JOSE RJ LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,686,787.13
  LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 920,383.61
  LT 500 kV ANGRA FUR /C. PAULISTA RJ/SP LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,159,983.71
  LT 500 kV ANGRA FUR /C. PAULISTA RJ/SP LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 5,129,475.81
  LT 500 kV ANGRA FUR /NOVA IGUACU RJ LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,374,739.89
  LT 500 kV ANGRA FUR /NOVA IGUACU RJ LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 5,478,080.96
  LT 500 kV ANGRA FUR /NOVA IGUACU RJ LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 15,701,806.09
  LT 500 kV ANGRA FUR /ZONA OESTE RJ LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,669,112.46
  LT 500 kV ANGRA FUR /ZONA OESTE RJ LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 12,418,701.18
  LT 500 kV ANGRA FUR /ZONA OESTE RJ LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 4,332,664.03
  LT 500 kV ARARAQUARA FURNAS /CAMPINAS SP LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 31/08/2017 30/08/2047 134,871.80
  LT 500 kV ARARAQUARA FURNAS /CAMPINAS SP LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 8,515,925.85
  LT 500 kV ARARAQUARA FURNAS /CAMPINAS SP LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,246,186.55
  LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS SP/MG LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,399,583.82
  LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS SP/MG LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 8,764,929.53
  LT 500 kV B.DESPACHO 3 /OURO PRETO 2 MG LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG RB FT LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039 9,968,631.36
  LT 500 kV C. PAULISTA /FERNAO DIAS SP LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,988,044.16
  LT 500 kV C. PAULISTA /FERNAO DIAS SP LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,840,767.21
  LT 500 kV C. PAULISTA /ITAJUBA 3 SP/MG LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG RB FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,639,439.01
  LT 500 kV C. PAULISTA /ITAJUBA 3 SP/MG LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG RB FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,626,011.04
  LT 500 kV C. PAULISTA /RESENDE SP/RJ LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ RB FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,788,841.22
  LT 500 kV C. PAULISTA /RESENDE SP/RJ LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ RB FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,718,049.40
  LT 500 kV C. PAULISTA /TAUBATE SP LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,546,394.64
  LT 500 kV C. PAULISTA /TAUBATE SP LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 11,847,726.42
  LT 500 kV C. PAULISTA /TAUBATE SP LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 4,133,461.09
  LT 500 kV C. PAULISTA /TAUBATE SP LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBNI REA 4347/2013 28/03/2017 27/03/2032 9,039.51
  LT 500 kV C. PAULISTA /TIJUCO PRETO SP LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,552,981.09
  LT 500 kV C. PAULISTA /TIJUCO PRETO SP LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 9,013,933.21
  LT 500 kV C. PAULISTA /TIJUCO PRETO SP LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 25,836,608.21
  LT 500 kV FERNAO DIAS /CAMPINAS SP LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,000,750.93
  LT 500 kV FERNAO DIAS /CAMPINAS SP LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 8,117,519.97
  LT 500 kV GURUPI /MIRACEMA TO LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,853,940.10

 

152 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  LT 500 kV GURUPI /MIRACEMA TO LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 36,542,385.09
  LT 500 kV GURUPI /MIRACEMA TO LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 12,748,988.41
  LT 500 kV IBIUNA /BATEIAS SP/PR LT 500 kV IBIUNA /BATEIAS C-1 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 64,152,766.19
  LT 500 kV IBIUNA /BATEIAS SP/PR LT 500 kV IBIUNA /BATEIAS C-2 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 5/9/2031 64,152,766.19
  LT 500 kV IBIUNA /ITATIBA SP LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBNI REA 6605/2017 7/1/2018 17/06/2052 15,370.96
  LT 500 kV IBIUNA /ITATIBA SP LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,638,433.00
  LT 500 kV IBIUNA /ITATIBA SP LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 12,275,957.49
  LT 500 kV IBIUNA /ITATIBA SP LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 4,282,863.30
  LT 500 kV ITATIBA /CAMPINAS SP LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBNI REA 6605/2017 7/1/2018 17/06/2052 15,370.96
  LT 500 kV ITATIBA /CAMPINAS SP LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,294,819.14
  LT 500 kV ITATIBA /CAMPINAS SP LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,711,335.99
  LT 500 kV ITATIBA /CAMPINAS SP LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 797,665.79
  LT 500 kV ITUMBIARA /SAO SIMAO-SE MG LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,092,789.29
  LT 500 kV ITUMBIARA /SAO SIMAO-SE MG LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 8,266,922.17
  LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 148,636.04
  LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 61,358.91
  LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBNI REA 8887/2020 29/08/2017 28/08/2045 144,981.98
  LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2045 144,981.98
  LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 100,114.88
  LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 92,038.36
  LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,890,455.08
  LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 9,512,706.74
  LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBNI REA 8887/2020 21/07/2017 20/07/2045 144,981.98
  LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2045 144,981.98
  LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,890,455.08
  LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 9,611,028.64
  LT 500 kV NOVA IGUACU /GRAJAU RJ LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ RB FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,573,450.47
  LT 500 kV NOVA IGUACU /GRAJAU RJ LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ RB FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,944,477.77
  LT 500 kV NOVA IGUACU /GRAJAU RJ LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ RB FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,197,884.21
  LT 500 kV NOVA IGUACU /SAO JOSE RJ LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,283,104.91
  LT 500 kV NOVA IGUACU /SAO JOSE RJ LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,145,416.93
  LT 500 kV NOVA IGUACU /SAO JOSE RJ LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 705,627.43
  LT 500 kV POCOS CALDAS /ITAJUBA 3 MG LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,264,444.04
  LT 500 kV POCOS CALDAS /ITAJUBA 3 MG LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 6,922,302.30
  LT 500 kV S.DA MESA /GURUPI GO/TO LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,853,940.10
  LT 500 kV S.DA MESA /GURUPI GO/TO LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 36,542,385.09
  LT 500 kV S.DA MESA /GURUPI GO/TO LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 12,748,988.41
  LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,639,183.93
  LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 12,400,383.26
  LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 35,543,179.25
  LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 35,471,807.41
  LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 12,375,482.89
  LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,623,844.20
  LT 500 kV TERMINAL RIO /RESENDE RJ LT 500 kV TERMINAL RIO /RESENDE C-1 RJ RB FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 4,233,062.56
  LT 500 kV TERMINAL RIO /RESENDE RJ LT 500 kV TERMINAL RIO /RESENDE C-1 RJ RB FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 12,133,213.80
  LT 500 kV TERMINAL RIO /RESENDE RJ LT 500 kV TERMINAL RIO /RESENDE C-1 RJ RB FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,607,753.55
  LT 500 kV TIJUCO PRETO /TAUBATE SP LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 478,599.48
  LT 500 kV TIJUCO PRETO /TAUBATE SP LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,226,801.59
  LT 500 kV TIJUCO PRETO /TAUBATE SP LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 776,891.48
  LT 500 kV ZONA OESTE /NOVA IGUACU RJ LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ RB FT LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 888,318.63
  LT 500 kV ZONA OESTE /NOVA IGUACU RJ LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ RB FT LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,441,972.28
  LT 500 kV ZONA OESTE /NOVA IGUACU RJ LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ RB FT LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,133,120.57
  LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP LT 600 kV F.IGUACU 50HZ /IBIUNA C-1 PR/SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 19,768,164.14
  LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP LT 600 kV F.IGUACU 50HZ /IBIUNA C-2 PR/SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 19,768,164.14
  LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP LT 600 kV F.IGUACU 50HZ /IBIUNA C-3 PR/SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 20,467,038.63
  LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP LT 600 kV F.IGUACU 50HZ /IBIUNA C-4 PR/SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 20,467,038.63
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 14,762,222.53
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 23,816,270.89
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 67,842,092.48
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 68,052,782.21
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 23,890,234.46
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 14,808,067.94
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 15,174,831.24
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 24,481,943.06
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 69,738,300.03
  LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,063,393.73
  LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 19,582,026.97
  LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 56,127,901.86
  LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 55,916,098.46
  LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 19,508,132.53
  LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,017,871.49
  LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,382,049.42
  LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,884,283.35
  LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 22,537,804.63
  LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 64,600,037.99
  LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 64,388,234.59
  LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 22,463,910.19
  LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,838,761.11
  LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 14,202,939.04
  M. MORAES EL 13,8 kV M. MORAES  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,642.57
  M. MORAES EL 13,8 kV M. MORAES  DIST1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 55,889.75
  M. MORAES EL 13,8 kV M. MORAES  DIST1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 159,205.33
  M. MORAES EL 13,8 kV M. MORAES  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,642.57
  M. MORAES EL 138 kV M. MORAES  FRANCA 3 DIT   062/2001 IPCA RCDM REA 1814/2009 30/09/2012 29/09/2038 657,807.58
  M. MORAES EL 138 kV M. MORAES LT 138 kV CASSIA /M. MORAES C-2 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  M. MORAES EL 138 kV M. MORAES LT 138 kV CASSIA /M. MORAES C-2 MG DIT   062/2001 IPCA RCDM REA 1814/2009 17/12/2013 16/12/2040 252,439.67
  M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 5/5/2013 5/4/2039 133,937.01
  M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 534,040.39
  M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 187,477.27
  M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-2 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-2 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 22/07/2013 21/07/2039 134,868.22
  M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-2 SP/MG DIT   062/2001 IPCA RMEL REN 643/2014 24/10/2014 23/10/2035 12,745.39
  M. MORAES EL 138 kV M. MORAES LT 138 kV JAGUARA-US /M. MORAES C-1 MG DIT   062/2001 IPCA RCDM REA 1814/2009 10/8/2013 10/7/2040 250,998.68
  M. MORAES EL 138 kV M. MORAES LT 138 kV JAGUARA-US /M. MORAES C-1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 27/04/2014 26/04/2043 117,071.44
  M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 27/04/2014 26/04/2041 34,211.75
  M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 27/04/2014 26/04/2041 53,164.83
  M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 27/04/2014 26/04/2040 50,662.68
  M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-2 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 24/02/2014 23/02/2042 253,841.64
  M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-2 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  M. MORAES EL 345 kV M. MORAES LT 345 kV ESTREITO /M. MORAES C-1 MG RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  M. MORAES EL 345 kV M. MORAES LT 345 kV ESTREITO /M. MORAES C-1 MG RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBNI REA 1523/2008 4/6/2015 4/5/2044 252,557.21
  M. MORAES EL 345 kV M. MORAES LT 345 kV ESTREITO /M. MORAES C-1 MG RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBNI REA 2040/2009 4/6/2015 4/5/2042 66,879.25
  M. MORAES EL 345 kV M. MORAES LT 345 kV FURNAS /M. MORAES C-1 MG RB FT LT 345 kV FURNAS /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  M. MORAES IB 138 kV MG 345 kV M. MORAES MG1 MG IB1 DIT   062/2001 IPCA RCDM REA 1814/2009 5/5/2013 5/4/2040 201,068.51
  M. MORAES IB 138 kV MG 345 kV M. MORAES MG1 MG IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,210.67
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB1 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBNI REA 1938/2009 14/12/2018 14/12/2050 775,163.93

 

153 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB2 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB2 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 283,511.97
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB2 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 812,629.45
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB3 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB3 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBNI REA 2040/2009 4/6/2015 4/5/2042 76,816.18
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB3 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBNI REA 1523/2008 29/09/2016 28/09/2047 254,204.98
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB4 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB5 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  M. MORAES MC 13,8 kV TR 138/13,8 kV M. MORAES TR12 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,974.62
  M. MORAES MC 13,8 kV TR 138/13,8 kV M. MORAES TR12 MG DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 49,972.15
  M. MORAES MC 13,8 kV TR 138/13,8 kV M. MORAES TR12 MG DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 142,348.70
  M. MORAES MC 138 kV TR 138/13,8 kV M. MORAES TR12 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 77,933.01
  M. MORAES MC 138 kV TR 138/13,8 kV M. MORAES TR12 MG DIT   062/2001 IPCA RMEL REN 643/2014 20/05/2014 19/05/2034 12,554.35
  M. MORAES MC 138 kV TR 138/13,8 kV M. MORAES TR12 MG DIT   062/2001 IPCA RCDM REA 1814/2009 26/11/2018 25/11/2050 94,843.88
  M. MORAES MC 138 kV TR 345/138 kV M. MORAES TR11 MG MC1 RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  M. MORAES MC 138 kV TR 345/138 kV M. MORAES TR11 MG MC2 RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBNI REA 1938/2009 14/12/2018 14/12/2048 341,252.06
  M. MORAES MC 138 kV TR 345/138 kV M. MORAES TR12 MG RBF FT TR 345/138 kV M. MORAES TR12 MG 062/2001 IPCA RBNI REA 1365/2008 23/07/2013 22/07/2040 726,295.49
  M. MORAES MC 345 kV TR 345/138 kV M. MORAES TR11 MG MC1 RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,996.14
  M. MORAES MC 345 kV TR 345/138 kV M. MORAES TR11 MG MC2 RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBNI REA 1938/2009 14/12/2018 14/12/2051 825,742.17
  M. MORAES MC 345 kV TR 345/138 kV M. MORAES TR12 MG RBF FT TR 345/138 kV M. MORAES TR12 MG 062/2001 IPCA RBNI REA 1365/2008 23/07/2013 22/07/2040 1,164,598.32
  M. MORAES MG 345 kV M. MORAES MG1 MG RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBNI REA 1365/2008 30/11/2018 30/11/2058 161,750.67
  M. MORAES MG 345 kV M. MORAES MG1 MG RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 562,932.00
  M. MORAES MG 345 kV M. MORAES MG1 MG RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 913,785.11
  M. MORAES MG 345 kV M. MORAES MG1 MG RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBNI REA 1938/2009 15/08/2014 14/08/2041 269,408.60
  M. MORAES MG 345 kV M. MORAES MG1 MG RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 3,961.92
  M. MORAES TR 138/13,8 kV M. MORAES TR12 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,092.96
  M. MORAES TR 138/13,8 kV M. MORAES TRR3 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 100,092.96
  M. MORAES TR 138/138 kV M. MORAES TREG11 MG RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 225,863.72
  M. MORAES TR 345/138 kV M. MORAES TR11 MG RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBNI REA 1938/2009 14/12/2018 14/12/2058 5,385,769.31
  M. MORAES TR 345/138 kV M. MORAES TR12 MG RBF FT TR 345/138 kV M. MORAES TR12 MG 062/2001 IPCA RBNI REA 1365/2008 23/07/2013 22/07/2043 4,535,485.68
  M. MORAES TR 345/138 kV M. MORAES TRR2 MG RBF FT TR 345/138 kV M. MORAES TRR2 MG 062/2001 IPCA RBNI REA 1365/2008 27/03/2015 26/03/2047 1,510,557.93
  MACAE MERCHAN EL 345 kV MACAE MERCHAN LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  MACAE MERCHAN EL 345 kV MACAE MERCHAN LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  MACAE MERCHAN EL 345 kV MACAE MERCHAN LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  MACAE MERCHAN EL 345 kV MACAE MERCHAN LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ 006/2005 IGPM RBL CC 006/2005 6/2/2010 3/4/2035 2,740,689.94
  MACAE MERCHAN EL 345 kV MACAE MERCHAN LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  MACAE MERCHAN IB 345 kV MG 345 kV MACAE MERCHAN MG1 RJ IB1 RB FT MG 345 kV MACAE MERCHAN MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  MACAE MERCHAN IB 345 kV MG 345 kV MACAE MERCHAN MG1 RJ IB2 RB FT MG 345 kV MACAE MERCHAN MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  MACAE MERCHAN IB 345 kV MG 345 kV MACAE MERCHAN MG2 RJ IB3 RB FT MG 345 kV MACAE MERCHAN MG2 RJ 006/2005 IGPM RBL CC 006/2005 6/2/2010 3/4/2035 1,057,467.24
  MACAE MERCHAN MC 345 kV RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ RB FT RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,963.72
  MACAE MERCHAN MG 345 kV MACAE MERCHAN MG1 RJ RB FT MG 345 kV MACAE MERCHAN MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 5,472.69
  MACAE MERCHAN MG 345 kV MACAE MERCHAN MG1 RJ RB FT MG 345 kV MACAE MERCHAN MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 572,978.78
  MACAE MERCHAN RTB 345 kV 20 Mvar MACAE MERCHAN RTR1 RJ RB FT RTB 345 kV 20 Mvar MACAE MERCHAN RTR1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 113,797.44
  MACAE MERCHAN RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ RB FT RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,392.31
  MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP RB FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP 062/2001 IPCA RBNI REA 7761/2019 13/12/2017 12/12/2032 9,112.05
  MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP RB FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBNI REA 7761/2019 13/12/2017 12/12/2032 9,112.05
  MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBNI REA 7761/2019 13/12/2017 12/12/2032 9,112.05
  MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  MARIMBONDO IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB1 RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  MARIMBONDO IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB2 RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  MARIMBONDO IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB3 RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  MARIMBONDO IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB4 RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBNIA REA 6787/2017     1,333,282.23
  MARIMBONDO MC 13,8 kV RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  MARIMBONDO MC 13,8 kV RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  MARIMBONDO MC 345 kV TR 500/345 kV MARIMBONDO TR9 MG RB FT TR 500/345 kV MARIMBONDO TR9 MG 062/2001 IPCA RBNI REA 5861/2016 26/01/2020 25/01/2035 116,441.56
  MARIMBONDO MC 345 kV TR 500/345 kV MARIMBONDO TR9 MG RB FT TR 500/345 kV MARIMBONDO TR9 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,996.14
  MARIMBONDO MC 500 kV RTB 500 kV 100 MVAr MARIMBONDO RT4 MG RB FT RTB 500 kV 100 MVAr MARIMBONDO RT4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 267,235.24
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG2 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG3 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG4 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG5 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG6 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG7 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG8 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG8 MG DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 463,740.62
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG8 MG DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,320,993.28
  MARIMBONDO MC 500 kV TR 500/345 kV MARIMBONDO TR9 MG RB FT TR 500/345 kV MARIMBONDO TR9 MG 062/2001 IPCA RBNI REA 5861/2016 26/01/2020 25/01/2035 123,809.53
  MARIMBONDO MC 500 kV TR 500/345 kV MARIMBONDO TR9 MG RB FT TR 500/345 kV MARIMBONDO TR9 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,422,106.04
  MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBNI REA 5861/2016 21/12/2017 20/12/2034 19,717.18
  MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 1,858.64
  MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RMEL REN 443/2011 13/07/2017 7/12/2031 49,076.01
  MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBNI REA 4347/2013 7/6/2015 7/5/2040 17,868.13
  MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBNIA REA 6787/2017     109,002.98
  MARIMBONDO RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,101.09
  MARIMBONDO RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 207,941.40
  MARIMBONDO RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,101.09
  MARIMBONDO RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 207,941.40
  MARIMBONDO RTB 500 kV 100 MVAr MARIMBONDO RT4 MG RB FT RTB 500 kV 100 MVAr MARIMBONDO RT4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,351.42
  MARIMBONDO TR 500/345 kV MARIMBONDO TR9 MG RB FT TR 500/345 kV MARIMBONDO TR9 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,319,161.14
  MARIMBONDO TR 500/345 kV MARIMBONDO TRR1 MG RB FT TR 500/345 kV MARIMBONDO TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 439,976.80
  MARIMBONDO II EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBNI REA 8887/2020 21/07/2017 20/07/2046 158,017.05
  MARIMBONDO II EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2046 158,017.05
  MARIMBONDO II EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBNI REA 8887/2020 29/08/2017 28/08/2046 158,017.05
  MARIMBONDO II EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2046 158,017.05
  MARIMBONDO II IB 500 kV MG 500 kV MARIMBONDO II MG2 MG IB3 RB FT MG 500 kV MARIMBONDO II MG2 MG 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2049 169,989.82
  MARIMBONDO II IB 500 kV MG 500 kV MARIMBONDO II MG2 MG IB5 RB FT MG 500 kV MARIMBONDO II MG2 MG 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2049 169,989.82
  MOGI TR 345/230 kV MOGI TRR1 SP RB FT TR 345/230 kV MOGI TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 299,375.72
  MOGI TR 345/230 kV MOGI TRR1 SP RB FT TR 345/230 kV MOGI TRR1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 485,964.69
  MOGI TR 345/230 kV MOGI TRR1 SP RB FT TR 345/230 kV MOGI TRR1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,392,919.05
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,469.36
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046 51,385.54
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 3578/2012 4/6/2015 4/5/2052 29,251.97
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 2837/2011 4/6/2015 4/5/2044 165,337.57
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 2040/2009 4/6/2015 4/5/2042 79,588.36
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP RB FT LT 230 kV MOGI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 2837/2011 4/6/2015 4/5/2042 100,904.24
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP RB FT LT 230 kV MOGI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 3578/2012 4/6/2015 4/5/2052 29,251.97
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP RB FT LT 230 kV MOGI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046 25,692.77
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP RB FT LT 230 kV MOGI /MOGI CRUZES C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,469.36
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,469.36
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046 103,666.37
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 3578/2012 4/6/2015 4/5/2052 29,251.97
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 2040/2009 4/6/2015 4/5/2042 33,440.49
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 2837/2011 5/3/2017 5/2/2048 127,721.52
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 2837/2011 5/3/2017 5/2/2049 118,133.37
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 2/8/2015 2/7/2036 9,473.02

 

154 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 2/8/2015 2/7/2036 9,473.02
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 2/8/2015 2/7/2036 9,473.02
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 1814/2009 8/11/2012 8/10/2038 338,814.41
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 1814/2009 16/02/2013 15/02/2039 295,973.33
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 3/1/2015 29/02/2036 9,494.17
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 3/1/2015 29/02/2036 9,494.17
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 3/1/2015 29/02/2036 9,494.17
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 1814/2009 4/6/2015 4/5/2045 179,547.25
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 1814/2009 4/6/2015 4/5/2042 153,123.15
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 1814/2009 4/6/2015 4/5/2042 65,612.38
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RBNI REA 1814/2009 4/6/2015 4/5/2044 332,584.25
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/03/2015 21/03/2036 9,510.35
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/03/2015 21/03/2036 9,510.35
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/03/2015 21/03/2036 9,510.35
  MOGI CRUZES IB 230 kV MG 345 kV MOGI CRUZES MG1 SP IB1 RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046 138,647.41
  MOGI CRUZES IB 230 kV MG 345 kV MOGI CRUZES MG1 SP IB1 RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 79,763.24
  MOGI CRUZES IB 230 kV MG 345 kV MOGI CRUZES MG1 SP IB1 RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 129,476.49
  MOGI CRUZES IB 345 kV MG 345 kV MOGI CRUZES MG1 SP IB1 RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  MOGI CRUZES IB 345 kV MG 345 kV MOGI CRUZES MG1 SP IB1 RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBNI REA 1814/2009 22/10/2012 21/10/2038 330,358.32
  MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046 55,348.16
  MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 100,782.60
  MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 163,596.39
  MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 100,782.60
  MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 163,596.39
  MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046 55,348.16
  MOGI CRUZES MC 345 kV TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  MOGI CRUZES MC 345 kV TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  MOGI CRUZES MC 345 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  MOGI CRUZES MC 345 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  MOGI CRUZES MC 345 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 915,783.21
  MOGI CRUZES MG 345 kV MOGI CRUZES MG1 SP RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 689,842.29
  MOGI CRUZES MG 345 kV MOGI CRUZES MG1 SP RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,119,793.53
  MOGI CRUZES MG 345 kV MOGI CRUZES MG1 SP RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2044 110,146.67
  MOGI CRUZES TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 897,529.73
  MOGI CRUZES TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,456,924.29
  MOGI CRUZES TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,175,977.48
  MOGI CRUZES TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 897,529.73
  MOGI CRUZES TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,456,924.29
  MOGI CRUZES TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,175,977.48
  NIQUELANDIA EL 230 kV NIQUELANDIA  DIST1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 244,302.26
  NIQUELANDIA EL 230 kV NIQUELANDIA  DIST1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 695,909.81
  NIQUELANDIA EL 230 kV NIQUELANDIA  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,427.75
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBNI REA 3578/2012 5/6/2016 5/5/2044 34,503.52
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,360.31
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 244,073.91
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 699,588.29
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV NIQUELANDIA /CODEMIN C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,427.75
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV NIQUELANDIA /CODEMIN C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 244,302.26
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV NIQUELANDIA /CODEMIN C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 695,909.81
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBNI REA 3578/2012 22/04/2019 21/04/2049 22,561.25
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,360.31
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 244,073.91
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 699,588.29
  NIQUELANDIA IB 230 kV MG 230 kV NIQUELANDIA MG1 GO IB1 RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 91,639.72
  NIQUELANDIA IB 230 kV MG 230 kV NIQUELANDIA MG1 GO IB1 RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 148,755.11
  NIQUELANDIA IB 230 kV MG 230 kV NIQUELANDIA MG1 GO IB1 RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 426,376.29
  NIQUELANDIA MG 230 kV NIQUELANDIA MG1 GO RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RMEL REN 443/2011 30/11/2017 29/11/2032 16,920.19
  NIQUELANDIA MG 230 kV NIQUELANDIA MG1 GO RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RMEL REN 443/2011 12/8/2017 12/7/2032 7,515.48
  NIQUELANDIA MG 230 kV NIQUELANDIA MG1 GO RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 287,293.96
  NIQUELANDIA MG 230 kV NIQUELANDIA MG1 GO RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 466,352.85
  NIQUELANDIA MG 230 kV NIQUELANDIA MG1 GO RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,336,705.69
  NORDESTE EL 345 kV NORDESTE LT 345 kV ITAPETI /NORDESTE C-1 SP RB FT LT 345 kV ITAPETI /NORDESTE C-1 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 1,962,567.89
  OURO PRETO 2 BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG RB FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,936.33
  OURO PRETO 2 BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG RB FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 357,013.89
  OURO PRETO 2 BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG RB FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,023,307.79
  OURO PRETO 2 EL 345 kV OURO PRETO 2 LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG RB FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  OURO PRETO 2 EL 500 kV OURO PRETO 2 LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG RB FT LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039 542,289.17
  OURO PRETO 2 IB 345 kV MG 345 kV OURO PRETO 2 MG2 MG IB1 RB FT MG 345 kV OURO PRETO 2 MG2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  OURO PRETO 2 IB 500 kV MG 345 kV OURO PRETO 2 MG2 MG IB3 RB FT MG 345 kV OURO PRETO 2 MG2 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039 197,135.09
  OURO PRETO 2 MC 345 kV BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG RB FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,817.68
  OURO PRETO 2 MC 345 kV BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG RB FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG 062/2001 IPCA RMEL REN 643/2014 25/11/2016 24/11/2048 190,586.21
  OURO PRETO 2 MC 345 kV RTL 345 kV 60 MVAr OURO PRETO 2 RTS5 MG RB FT RTL 345 kV 60 MVAr OURO PRETO 2 RTS5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 110,704.01
  OURO PRETO 2 MC 345 kV TR 500/345 kV OURO PRETO 2 TR5 MG RB FT TR 500/345 kV OURO PRETO 2 TR5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,996.14
  OURO PRETO 2 MC 500 kV TR 500/345 kV OURO PRETO 2 TR5 MG RB FT TR 500/345 kV OURO PRETO 2 TR5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  OURO PRETO 2 MG 345 kV OURO PRETO 2 MG2 MG RB FT MG 345 kV OURO PRETO 2 MG2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 695,397.03
  OURO PRETO 2 RTL 345 kV 60 MVAr OURO PRETO 2 RTS5 MG RB FT RTL 345 kV 60 MVAr OURO PRETO 2 RTS5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,392.31
  OURO PRETO 2 TR 500/345 kV OURO PRETO 2 TR5 MG RB FT TR 500/345 kV OURO PRETO 2 TR5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,174,087.00
  OURO PRETO 2 TR 500/345 kV OURO PRETO 2 TRR1 MG RB FT TR 500/345 kV OURO PRETO 2 TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 391,002.58
  P. COLOMBIA EL 13,8 kV P. COLOMBIA  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,642.57
  P. COLOMBIA EL 13,8 kV P. COLOMBIA  DIST1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 55,889.75
  P. COLOMBIA EL 13,8 kV P. COLOMBIA  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,642.57
  P. COLOMBIA EL 13,8 kV P. COLOMBIA  DIST2 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 55,889.75
  P. COLOMBIA EL 138 kV P. COLOMBIA  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 28/06/2017 27/06/2040 4,255.81
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 28/06/2017 27/06/2040 4,255.81
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 28/06/2017 27/06/2040 4,255.81
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-2 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 29/06/2017 28/06/2040 4,256.20
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-2 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 29/06/2017 28/06/2040 4,256.20
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-2 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 29/06/2017 28/06/2040 4,256.20
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-2 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-3 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-3 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 30/06/2017 29/06/2040 4,256.58
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-3 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 30/06/2017 29/06/2040 4,256.58
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-3 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 30/06/2017 29/06/2040 4,256.58
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 8/10/2017 8/9/2046 20,181.05
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 8/10/2017 8/9/2046 20,181.05
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 8/10/2017 8/9/2046 14,623.95
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 8/10/2017 8/9/2046 14,623.95
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 8/10/2017 8/9/2046 20,181.05
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 8/10/2017 8/9/2046 20,181.05
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 7/4/2017 7/3/2040 10,140.40
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 7/4/2017 7/3/2040 10,140.40

 

155 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 7/4/2017 7/3/2040 10,140.40
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 1814/2009 10/5/2012 10/4/2037 375,570.50
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG RB FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 7/3/2017 7/2/2040 10,139.49
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG RB FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 7/3/2017 7/2/2040 10,139.49
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG RB FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 7/3/2017 7/2/2040 10,139.49
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG RB FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RBNI REA 1814/2009 18/07/2012 17/07/2037 366,267.33
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RMEL REN 443/2011 7/5/2017 7/4/2040 10,141.30
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RMEL REN 443/2011 7/5/2017 7/4/2040 10,141.30
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RMEL REN 443/2011 7/5/2017 7/4/2040 10,141.30
  P. COLOMBIA IB 138 kV MG 345 kV P. COLOMBIA MG1 MG IB1 DIT   062/2001 IPCA RCDM REA 6198/2017 31/01/2020 31/01/2050 83,087.53
  P. COLOMBIA IB 138 kV MG 345 kV P. COLOMBIA MG1 MG IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  P. COLOMBIA IB 345 kV MG 345 kV P. COLOMBIA MG1 MG IB1 RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  P. COLOMBIA IB 345 kV MG 345 kV P. COLOMBIA MG1 MG IB1 RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBNI REA 1814/2009 29/05/2012 28/05/2037 339,020.67
  P. COLOMBIA IB 345 kV MG 345 kV P. COLOMBIA MG1 MG IB2 RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  P. COLOMBIA MC 13,8 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,974.62
  P. COLOMBIA MC 13,8 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 49,972.15
  P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,001.78
  P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG1 MG DIT   062/2001 IPCA RMEL REN 443/2011 2/8/2013 2/7/2041 115,778.81
  P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG2 MG DIT   062/2001 IPCA RMEL REN 443/2011 15/03/2013 14/03/2041 116,120.26
  P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG2 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,001.78
  P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG3 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,001.78
  P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG3 MG DIT   062/2001 IPCA RCDM REA 6198/2017 30/12/2019 30/12/2052 34,702.71
  P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG4 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,001.78
  P. COLOMBIA MC 138 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RCDM REA 6198/2017 30/12/2019 30/12/2052 34,702.71
  P. COLOMBIA MC 138 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RMEL REN 443/2011 31/08/2017 30/08/2040 4,274.43
  P. COLOMBIA MC 138 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RMEL REN 443/2011 31/08/2017 30/08/2040 4,274.43
  P. COLOMBIA MC 138 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RMEL REN 443/2011 31/08/2017 30/08/2040 4,274.43
  P. COLOMBIA MC 138 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,001.78
  P. COLOMBIA MC 138 kV TR 345/138 kV P. COLOMBIA TR6 MG RBF FT TR 345/138 kV P. COLOMBIA TR6 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2044 694,796.89
  P. COLOMBIA MC 345 kV TR 345/138 kV P. COLOMBIA TR6 MG RBF FT TR 345/138 kV P. COLOMBIA TR6 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2047 1,174,876.82
  P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,739.68
  P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 876,137.95
  P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,511,271.42
  P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2052 200,671.93
  P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2051 38,286.94
  P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2055 122,913.31
  P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RMEL REN 443/2011 13/07/2017 7/12/2031 8,396.08
  P. COLOMBIA TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 19,644.27
  P. COLOMBIA TR 138/138 kV P. COLOMBIA TRD6 MG RBF FT TR 345/138 kV P. COLOMBIA TR6 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2055 3,546,239.37
  P. COLOMBIA TR 345/138 kV P. COLOMBIA TR6 MG RBF FT TR 345/138 kV P. COLOMBIA TR6 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2055 3,940,030.44
  P. COLOMBIA TR 345/138 kV P. COLOMBIA TR6R MG RBF FT TR 345/138 kV P. COLOMBIA TR6 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2055 1,313,343.48
  PARQUE EMAS EL 138 kV PARQUE EMAS LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2039 736,893.77
  PARQUE EMAS EL 138 kV PARQUE EMAS LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2039 782,743.39
  PARQUE EMAS MG 138 kV PARQUE EMAS MG1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2038 571,054.40
  PIRINEUS EL 230 kV PIRINEUS LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO RB FT LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  PIRINEUS EL 230 kV PIRINEUS LT 230 kV PIRINEUS /XAVANTES C-1 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  PIRINEUS EL 230 kV PIRINEUS LT 230 kV PIRINEUS /XAVANTES C-2 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-2 GO 014/2011 IPCA RBL CC 014/2011 6/8/2018 12/9/2041 546,868.56
  PIRINEUS IB 230 kV MG 230 kV PIRINEUS MG1 GO IB1 RB FT MG 230 kV PIRINEUS MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 91,639.72
  PIRINEUS MG 230 kV PIRINEUS MG1 GO RB FT MG 230 kV PIRINEUS MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,900.07
  POCOS CALDAS BC 138 kV 150 Mvar POCOS CALDAS BC1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 185,292.65
  POCOS CALDAS BC 345 kV 150 Mvar POCOS CALDAS BC2 MG RB FT BC 345 kV 150 Mvar POCOS CALDAS BC2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 202,920.72
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV DME POCOS CAL /POCOS CALDAS C-1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV DME POCOS CAL /POCOS CALDAS C-2 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-1 MG DIT   062/2001 IPCA RMEL REN 443/2011 14/05/2017 13/05/2040 4,241.44
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-1 MG DIT   062/2001 IPCA RMEL REN 443/2011 14/05/2017 13/05/2040 4,241.44
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-1 MG DIT   062/2001 IPCA RMEL REN 443/2011 14/05/2017 13/05/2040 4,241.44
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-2 MG DIT   062/2001 IPCA RMEL REN 443/2011 15/05/2017 14/05/2040 4,241.82
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-2 MG DIT   062/2001 IPCA RMEL REN 443/2011 15/05/2017 14/05/2040 4,241.82
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-2 MG DIT   062/2001 IPCA RMEL REN 443/2011 15/05/2017 14/05/2040 4,241.82
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-2 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-1 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-1 SP/MG DIT   062/2001 IPCA RCDM REA 2737/2011 27/05/2013 26/05/2038 107,543.27
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-2 SP/MG DIT   062/2001 IPCA RCDM REA 2737/2011 27/05/2013 26/05/2038 107,543.27
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-2 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 4/12/2017 4/11/2040 4,231.94
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-2 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 4/12/2017 4/11/2040 4,231.94
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-2 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 4/12/2017 4/11/2040 4,231.94
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-2 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4347/2013 7/2/2015 7/1/2040 4,467.22
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 29/01/2017 28/01/2040 10,037.23
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 29/01/2017 28/01/2040 10,037.23
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 29/01/2017 28/01/2040 10,037.23
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 2040/2009 22/11/2012 21/11/2037 355,941.18
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040 10,120.16
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040 10,120.16
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040 10,120.16
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4347/2013 7/2/2015 7/1/2040 4,467.22
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,075,965.79
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RBNI REA 4347/2013 7/2/2015 7/1/2040 4,467.22
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RMEL REN 443/2011 1/8/2017 1/7/2040 10,017.81
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RMEL REN 443/2011 1/8/2017 1/7/2040 10,017.81
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RMEL REN 443/2011 1/8/2017 1/7/2040 10,017.81
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RMEL REN 443/2011 23/03/2017 22/03/2040 10,073.03
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RMEL REN 443/2011 23/03/2017 22/03/2040 10,073.03
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RMEL REN 443/2011 23/03/2017 22/03/2040 10,073.03
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RBNI REA 4347/2013 7/2/2015 7/1/2040 4,467.22
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4347/2013 7/2/2015 7/1/2040 4,467.22
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 17/02/2017 16/02/2040 10,048.27
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 17/02/2017 16/02/2040 10,048.27
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 17/02/2017 16/02/2040 10,048.27
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 3/3/2017 3/2/2040 10,054.66
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 3/3/2017 3/2/2040 10,054.66
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 3/3/2017 3/2/2040 10,054.66
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBNI REA 4347/2013 7/2/2015 7/1/2040 4,467.22
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4347/2013 7/2/2015 7/1/2040 4,467.22
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 31/05/2017 30/05/2040 10,122.90
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 31/05/2017 30/05/2040 10,122.90
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 31/05/2017 30/05/2040 10,122.90
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 5/11/2017 5/10/2040 10,104.68

 

156 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 5/11/2017 5/10/2040 10,104.68
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 5/11/2017 5/10/2040 10,104.68
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBNI REA 4347/2013 7/2/2015 7/1/2040 4,467.22
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 2/11/2017 2/10/2046 41,225.64
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 2/11/2017 2/10/2046 41,225.64
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 643/2014 11/7/2016 11/6/2042 101,603.42
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 643/2014 12/10/2016 12/9/2045 41,062.84
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 12/10/2016 12/9/2040 9,426.31
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 12/10/2016 12/9/2040 9,426.31
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 5/2/2017 5/1/2047 37,945.70
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 5/2/2017 5/1/2046 41,421.48
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 5/2/2017 5/1/2046 60,031.12
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 5/2/2017 5/1/2040 14,315.63
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 5/2/2017 5/1/2040 14,315.63
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 5/2/2017 5/1/2040 14,315.63
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 12/10/2016 12/9/2040 9,426.31
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 25/02/2017 24/02/2046 41,269.35
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  POCOS CALDAS IB 138 kV MG 500 kV POCOS CALDAS MG1 MG IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,210.67
  POCOS CALDAS IB 138 kV MG 500 kV POCOS CALDAS MG1 MG IB1 DIT   062/2001 IPCA RMEL REN 643/2014 15/10/2016 14/10/2045 41,699.64
  POCOS CALDAS IB 345 kV MG 500 kV POCOS CALDAS MG1 MG IB1 RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBNI REA 1814/2009 16/06/2012 15/06/2038 269,630.32
  POCOS CALDAS IB 345 kV MG 500 kV POCOS CALDAS MG1 MG IB1 RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBNI REA 4347/2013 7/2/2015 7/1/2040 26,803.30
  POCOS CALDAS IB 345 kV MG 500 kV POCOS CALDAS MG1 MG IB1 RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  POCOS CALDAS IB 345 kV MG 500 kV POCOS CALDAS MG1 MG IB1 RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 283,511.97
  POCOS CALDAS IB 345 kV MG 500 kV POCOS CALDAS MG1 MG IB1 RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 812,629.45
  POCOS CALDAS MC 13,8 kV RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  POCOS CALDAS MC 13,8 kV RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG 062/2001 IPCA RMEL REN 443/2011 31/05/2017 30/05/2031 7,696.41
  POCOS CALDAS MC 13,8 kV RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2031 7,888.15
  POCOS CALDAS MC 13,8 kV RTB 13,8 kV 25 Mvar POCOS CALDAS RT2 MG RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  POCOS CALDAS MC 13,8 kV RTB 13,8 kV 50 Mvar POCOS CALDAS RT4 MG RB FT RTB 13,8 kV 50 Mvar POCOS CALDAS RT4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  POCOS CALDAS MC 13,8 kV RTB 13,8 kV 50 Mvar POCOS CALDAS RT5 MG RB FT RTB 13,8 kV 50 Mvar POCOS CALDAS RT5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,756.28
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 643/2014 21/10/2016 20/10/2045 5,940.91
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2041 518.14
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2041 518.14
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2041 518.14
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,756.28
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR5 MG RBF FT TR 345/138 kV POCOS CALDAS TR5 MG 062/2001 IPCA RBNI REA 1497/2008 22/12/2012 21/12/2043 44,186.96
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR6 MG RBF FT TR 345/138 kV POCOS CALDAS TR6 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,756.28
  POCOS CALDAS MC 13,8 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,551.34
  POCOS CALDAS MC 13,8 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 643/2014 23/12/2016 22/12/2045 5,969.75
  POCOS CALDAS MC 138 kV BC 138 kV 150 Mvar POCOS CALDAS BC1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 80,901.70
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 125,613.81
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 360,046.45
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040 4,223.93
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040 4,223.93
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040 4,223.93
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040 4,246.02
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040 4,246.02
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040 4,246.02
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 125,613.81
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 360,046.45
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 4/10/2017 4/9/2046 21,315.79
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 4/10/2017 4/9/2046 21,315.79
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 4/10/2017 4/9/2046 21,315.79
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR5 MG RBF FT TR 345/138 kV POCOS CALDAS TR5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR6 MG RBF FT TR 345/138 kV POCOS CALDAS TR6 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  POCOS CALDAS MC 345 kV BC 345 kV 150 Mvar POCOS CALDAS BC2 MG RB FT BC 345 kV 150 Mvar POCOS CALDAS BC2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,710.67
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040 10,065.68
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040 10,065.68
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040 10,065.68
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBNI REA 1814/2009 26/02/2012 25/02/2037 366,536.11
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBNI REA 4347/2013 7/2/2015 7/1/2040 8,934.43
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 915,783.21
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 915,783.21
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBNI REA 1814/2009 3/6/2012 3/5/2038 303,469.55
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBNI REA 4347/2013 7/2/2015 7/1/2040 8,934.43
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040 10,118.34
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040 10,118.34
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040 10,118.34
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBNI REA 1814/2009 24/04/2012 23/04/2038 304,917.06
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBNI REA 1814/2009 24/06/2012 23/06/2037 373,911.86
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBNI REA 4347/2013 7/2/2015 7/1/2040 4,467.22
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR5 MG RBF FT TR 345/138 kV POCOS CALDAS TR5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR6 MG RBF FT TR 345/138 kV POCOS CALDAS TR6 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  POCOS CALDAS MC 345 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  POCOS CALDAS MC 345 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 643/2014 23/12/2016 22/12/2039 30,028.18
  POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 643/2014 23/12/2016 22/12/2045 44,550.63
  POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2046 44,627.10
  POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2046 44,627.10
  POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 443/2011 23/12/2016 22/12/2040 8,868.94
  POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 443/2011 23/12/2016 22/12/2040 8,868.94
  POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 443/2011 23/12/2016 22/12/2040 8,868.94
  POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,404,977.46
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,280,644.00
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 6,537,002.68
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 349.73
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040 14,349.24
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040 14,349.24
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040 14,349.24
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 7/5/2016 7/4/2029 12,102.27
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 7/5/2016 7/4/2029 17,454.29
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 7/5/2016 7/4/2029 17,454.29
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 7/5/2016 7/4/2029 27,404.70
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 643/2014 17/10/2016 16/10/2039 42,364.98

 

157 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  POCOS CALDAS RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,528.28
  POCOS CALDAS RTB 13,8 kV 25 Mvar POCOS CALDAS RT2 MG RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,528.28
  POCOS CALDAS RTB 13,8 kV 50 Mvar POCOS CALDAS RT4 MG RB FT RTB 13,8 kV 50 Mvar POCOS CALDAS RT4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,101.09
  POCOS CALDAS RTB 13,8 kV 50 Mvar POCOS CALDAS RT5 MG RB FT RTB 13,8 kV 50 Mvar POCOS CALDAS RT5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,101.09
  POCOS CALDAS RTL 500 kV 136 Mvar POCOS CALDAS RTIJ MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 516,341.85
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 835,204.84
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBNI REA 4347/2013 7/2/2015 7/1/2040 4,467.22
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 4/10/2017 4/9/2040 4,231.17
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 4/10/2017 4/9/2040 4,231.17
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 4/10/2017 4/9/2040 4,231.17
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 514,523.08
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR5 MG RBF FT TR 345/138 kV POCOS CALDAS TR5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR6 MG RBF FT TR 345/138 kV POCOS CALDAS TR6 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TRR1 MG RBF FT TR 345/138 kV POCOS CALDAS TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,507.69
  POCOS CALDAS TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,319,161.14
  POCOS CALDAS TR 500/345 kV POCOS CALDAS TRR1 MG RB FT TR 500/345 kV POCOS CALDAS TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 439,976.80
  POCOS CALDAS TT 13,8/0 kV POCOS CALDAS TRT1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  POCOS CALDAS TT 13,8/0 kV POCOS CALDAS TRT2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  POCOS CALDAS TT 13,8/0 kV POCOS CALDAS TRT3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  POCOS CALDAS TT 13,8/0 kV POCOS CALDAS TRT4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  POCOS CALDAS TT 13,8/0 kV POCOS CALDAS TRT5 MG RBF FT TR 345/138 kV POCOS CALDAS TR5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  RIO CLARO EL 138 kV RIO CLARO LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2040 783,805.14
  RIO CLARO EL 138 kV RIO CLARO LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2040 783,805.14
  RIO CLARO MG 138 kV RIO CLARO MG1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2038 541,725.90
  RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,523.97
  RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,523.97
  RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,523.97
  RIO VERDE FUR CR 230 kV 216 Mvar RIO VERDE FUR BC2 GO RB FT CR 230 kV 216 Mvar RIO VERDE FUR BC2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 406,020.96
  RIO VERDE FUR CR 230 kV 34 Mvar RIO VERDE FUR BC3 GO RB FT CR 230 kV 34 Mvar RIO VERDE FUR BC3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 127,473.42
  RIO VERDE FUR CR 230 kV 37,2 Mvar RIO VERDE FUR BC1 GO RB FT CR 230 kV 37,2 Mvar RIO VERDE FUR BC1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 132,370.96
  RIO VERDE FUR EL 138 kV RIO VERDE FUR  PERDIGAO C1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE CLG /RIO VERDE FUR C-1 GO DIT   062/2001 IPCA RCDM REA 2969/2011 13/01/2013 1/12/2038 44,890.58
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE CLG /RIO VERDE FUR C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /C. DOURADA C-2 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /C. DOURADA C-2 GO DIT   062/2001 IPCA RMEL REN 643/2014 15/05/2016 14/05/2038 12,653.95
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035 4,034.75
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035 4,034.75
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035 4,034.75
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RCDM REA 2969/2011 11/3/2013 11/2/2039 45,922.15
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RMEL REN 443/2011 30/01/2015 29/01/2039 1,839.31
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RMEL REN 443/2011 30/01/2015 29/01/2039 1,839.31
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 252,491.42
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 252,491.42
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 723,715.35
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RMEL REN 443/2011 24/08/2014 23/08/2038 1,823.29
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RMEL REN 443/2011 24/08/2014 23/08/2038 1,823.29
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RMEL REN 443/2011 24/08/2014 23/08/2038 1,823.29
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 252,491.42
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 723,715.35
  RIO VERDE FUR IB 138 kV MG 230 kV RIO VERDE FUR MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,210.67
  RIO VERDE FUR IB 138 kV MG 230 kV RIO VERDE FUR MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 97,139.41
  RIO VERDE FUR IB 138 kV MG 230 kV RIO VERDE FUR MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 276,707.51
  RIO VERDE FUR IB 230 kV MG 230 kV RIO VERDE FUR MG1 GO IB1 RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 91,639.72
  RIO VERDE FUR MC 13,8 kV BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  RIO VERDE FUR MC 13,8 kV BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  RIO VERDE FUR MC 13,8 kV BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  RIO VERDE FUR MC 13,8 kV RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  RIO VERDE FUR MC 13,8 kV RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  RIO VERDE FUR MC 13,8 kV RTB 13,8 kV 5 Mvar RIO VERDE FUR RT1 GO RBF FT RTB 13,8 kV 5 Mvar RIO VERDE FUR RT1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  RIO VERDE FUR MC 13,8 kV TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,551.34
  RIO VERDE FUR MC 13,8 kV TR 230/138 kV RIO VERDE FUR TR2 GO RBF FT TR 230/138 kV RIO VERDE FUR TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,551.34
  RIO VERDE FUR MC 138 kV RTB 138 kV 15 Mvar RIO VERDE FUR RT4 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 74,065.95
  RIO VERDE FUR MC 138 kV TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  RIO VERDE FUR MC 138 kV TR 230/138 kV RIO VERDE FUR TR2 GO RBF FT TR 230/138 kV RIO VERDE FUR TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,383.65
  RIO VERDE FUR MC 138 kV TR 230/138 kV RIO VERDE FUR TR3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBNI REA 2367/2010 10/10/2012 10/9/2038 655,263.48
  RIO VERDE FUR MC 138 kV TR 230/138 kV RIO VERDE FUR TR3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBNI REA 2367/2010 10/10/2012 10/9/2039 282,851.26
  RIO VERDE FUR MC 230 kV RTB 230 kV 45 MVAr RIO VERDE FUR RT5 GO RB FT RTB 230 kV 45 MVAr RIO VERDE FUR RT5 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,956.05
  RIO VERDE FUR MC 230 kV TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  RIO VERDE FUR MC 230 kV TR 230/138 kV RIO VERDE FUR TR2 GO RBF FT TR 230/138 kV RIO VERDE FUR TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  RIO VERDE FUR MC 230 kV TR 230/138 kV RIO VERDE FUR TR3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBNI REA 2367/2010 10/10/2012 10/9/2038 836,386.26
  RIO VERDE FUR MC 230 kV TR 230/138 kV RIO VERDE FUR TR3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBNI REA 5484/2015 22/03/2019 21/03/2049 32,403.54
  RIO VERDE FUR MG 230 kV RIO VERDE FUR MG1 GO RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 422,951.54
  RIO VERDE FUR MG 230 kV RIO VERDE FUR MG1 GO RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 686,560.41
  RIO VERDE FUR MG 230 kV RIO VERDE FUR MG1 GO RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RBNI REA 2969/2011 30/01/2013 29/01/2036 180,554.47
  RIO VERDE FUR MG 230 kV RIO VERDE FUR MG1 GO RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2031 7,560.43
  RIO VERDE FUR RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,528.28
  RIO VERDE FUR RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 187,532.45
  RIO VERDE FUR RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,528.28
  RIO VERDE FUR RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 187,532.45
  RIO VERDE FUR RTB 13,8 kV 5 Mvar RIO VERDE FUR RT1 GO RBF FT RTB 13,8 kV 5 Mvar RIO VERDE FUR RT1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 86,335.11
  RIO VERDE FUR RTB 138 kV 15 Mvar RIO VERDE FUR RT4 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 107,016.92
  RIO VERDE FUR RTB 230 kV 15 MVAr RIO VERDE FUR RTR2 GO RB FT RTB 230 kV 15 MVAr RIO VERDE FUR RTR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,772.74
  RIO VERDE FUR RTB 230 kV 45 MVAr RIO VERDE FUR RT5 GO RB FT RTB 230 kV 45 MVAr RIO VERDE FUR RT5 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 299,318.22
  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 375,439.27
  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 609,435.63
  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,746,823.40
  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TR2 GO RBF FT TR 230/138 kV RIO VERDE FUR TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 375,439.27
  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TR3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBNI REA 2367/2010 10/10/2012 10/9/2041 1,758,086.01
  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TRR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TRR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,654.29
  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TRR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 202,346.35
  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TRR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 579,984.71
  RIO VERDE FUR TT 13,8/0 kV RIO VERDE FUR TRT1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  RIO VERDE FUR TT 13,8/0 kV RIO VERDE FUR TRT2 GO RBF FT TR 230/138 kV RIO VERDE FUR TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  RIO VERDE FUR TT 13,8/0 kV RIO VERDE FUR TRT3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 680,766.99
  ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 148,132.72

 

158 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 238,986.31
  ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 148,132.72
  ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 238,986.31
  ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 680,766.99
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 187,477.27
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST1 DIT   062/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2040 64,453.12
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST1 DIT   062/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2036 12,156.93
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST2 DIT   062/2001 IPCA RMEL REN 643/2014 12/4/2015 12/3/2041 64,812.08
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST2 DIT   062/2001 IPCA RMEL REN 643/2014 15/06/2016 14/06/2046 160,476.00
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST2 DIT   062/2001 IPCA RMEL REN 643/2014 19/11/2016 18/11/2045 23,678.19
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST2 DIT   062/2001 IPCA RMEL REN 643/2014 3/9/2016 3/8/2038 12,326.95
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 11/6/2015 11/5/2043 23,086.31
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 20/04/2016 19/04/2044 23,352.97
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 29/09/2015 28/09/2036 12,171.75
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 23/09/2015 22/09/2036 12,164.35
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 11/6/2015 11/5/2046 101,669.30
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 15/09/2015 14/09/2042 33,340.14
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 18/12/2015 17/12/2043 33,560.57
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 19/12/2015 18/12/2043 23,158.68
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 20/04/2016 19/04/2044 23,352.97
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 18/12/2015 17/12/2046 101,956.94
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 29/09/2015 28/09/2036 4,057.25
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 29/09/2015 28/09/2036 4,057.25
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 29/09/2015 28/09/2036 4,057.25
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RCDM REN 643/2014 15/11/2013 14/11/2037 55,768.91
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 15/09/2015 14/09/2045 101,333.80
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 11/6/2015 11/5/2043 33,458.43
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 15/09/2015 14/09/2042 23,004.69
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 19/04/2016 18/04/2044 23,351.12
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 5/12/2015 5/11/2036 12,024.18
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 1/12/2016 1/11/2038 12,272.35
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RCDM REN 643/2014 14/12/2013 13/12/2037 55,914.96
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 19/04/2016 18/04/2044 23,351.12
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 3/8/2016 3/7/2046 159,453.25
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,205.48
  ROCHA LEAO IB 138 kV MG 138 kV ROCHA LEAO MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,210.67
  ROCHA LEAO IB 138 kV MG 138 kV ROCHA LEAO MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 643/2014 21/04/2016 20/04/2046 131,329.86
  ROCHA LEAO IB 138 kV MG 138 kV ROCHA LEAO MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 443/2011 2/6/2017 2/5/2046 24,519.01
  ROCHA LEAO IB 138 kV MG 138 kV ROCHA LEAO MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 443/2011 2/6/2017 2/5/2046 24,519.01
  ROCHA LEAO MC 138 kV BC 138 kV 75 Mvar ROCHA LEAO BC1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,446.37
  ROCHA LEAO MC 138 kV BC 138 kV 75 Mvar ROCHA LEAO BC2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,446.37
  ROCHA LEAO MG 138 kV ROCHA LEAO MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 236,668.44
  ROCHA LEAO MG 138 kV ROCHA LEAO MG1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 381,823.24
  S.DA MESA BC 230 kV 150 Mvar S.DA MESA BC1 GO RB FT BC 230 kV 150 Mvar S.DA MESA BC1 GO 062/2001 IPCA RBNI REA 5148/2015 25/07/2018 25/07/2038 1,118,461.98
  S.DA MESA BC 230 kV 150 Mvar S.DA MESA BC2 GO RB FT BC 230 kV 150 Mvar S.DA MESA BC2 GO 062/2001 IPCA RBNI REA 5148/2015 25/07/2018 25/07/2038 1,118,461.98
  S.DA MESA CR 500 kV 107 MVAr S.DA MESA BC1 GO RB FT CR 500 kV 107 MVAr S.DA MESA BC1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,933.09
  S.DA MESA CR 500 kV 107 MVAr S.DA MESA BC1 GO RB FT CR 500 kV 107 MVAr S.DA MESA BC1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 417,069.26
  S.DA MESA CR 500 kV 107 MVAr S.DA MESA BC1 GO RB FT CR 500 kV 107 MVAr S.DA MESA BC1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,195,444.31
  S.DA MESA CR 500 kV 107 MVAr S.DA MESA BC1 GO RB FT CR 500 kV 107 MVAr S.DA MESA BC1 GO 062/2001 IPCA RBNI REA 6370/2017 15/12/2020 15/12/2040 7,046,998.93
  S.DA MESA CR 500 kV 107 Mvar S.DA MESA BC1D GO RB FT CR 500 kV 107 Mvar S.DA MESA BC1D GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,933.09
  S.DA MESA CR 500 kV 107 Mvar S.DA MESA BC1D GO RB FT CR 500 kV 107 Mvar S.DA MESA BC1D GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 417,069.26
  S.DA MESA CR 500 kV 107 Mvar S.DA MESA BC1D GO RB FT CR 500 kV 107 Mvar S.DA MESA BC1D GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,195,444.31
  S.DA MESA CR 500 kV 107 Mvar S.DA MESA BC2D GO RB FT CR 500 kV 107 Mvar S.DA MESA BC2D GO 062/2001 IGPM RMEL REN 643/2014 13/09/2015 9/12/2032 25,506.40
  S.DA MESA CR 500 kV 107 Mvar S.DA MESA BC2D GO RB FT CR 500 kV 107 Mvar S.DA MESA BC2D GO 062/2001 IGPM RMEL REN 643/2014 14/06/2015 13/06/2030 20,962.86
  S.DA MESA EL 138 kV S.DA MESA LT 138 kV MINACU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  S.DA MESA EL 138 kV S.DA MESA LT 138 kV MINACU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  S.DA MESA EL 138 kV S.DA MESA LT 138 kV MINACU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 563,810.12
  S.DA MESA EL 138 kV S.DA MESA LT 138 kV PORANGATU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  S.DA MESA EL 138 kV S.DA MESA LT 138 kV PORANGATU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  S.DA MESA EL 138 kV S.DA MESA LT 138 kV PORANGATU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 563,810.12
  S.DA MESA EL 230 kV S.DA MESA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBNI REA 3578/2012 22/04/2019 21/04/2049 22,561.25
  S.DA MESA EL 230 kV S.DA MESA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 155,545.87
  S.DA MESA EL 230 kV S.DA MESA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 252,491.42
  S.DA MESA EL 230 kV S.DA MESA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 723,715.35
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 524,938.95
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,504,630.85
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 524,938.95
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,504,630.85
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 524,938.95
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,504,630.85
  S.DA MESA IB 138 kV MG 500 kV S.DA MESA MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  S.DA MESA IB 138 kV MG 500 kV S.DA MESA MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 108,655.46
  S.DA MESA IB 138 kV MG 500 kV S.DA MESA MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 309,511.68
  S.DA MESA IB 230 kV MG 500 kV S.DA MESA MG1 GO IB1 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 91,639.72
  S.DA MESA IB 230 kV MG 500 kV S.DA MESA MG1 GO IB1 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 148,755.11
  S.DA MESA IB 230 kV MG 500 kV S.DA MESA MG1 GO IB1 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 426,376.29
  S.DA MESA IB 500 kV MG 500 kV S.DA MESA MG1 GO IB1 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  S.DA MESA IB 500 kV MG 500 kV S.DA MESA MG1 GO IB2 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  S.DA MESA IB 500 kV MG 500 kV S.DA MESA MG1 GO IB3 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  S.DA MESA IB 500 kV MG 500 kV S.DA MESA MG1 GO IB4 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  S.DA MESA IB 500 kV MG 500 kV S.DA MESA MG1 GO IB5 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  S.DA MESA MC 138 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  S.DA MESA MC 138 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 135,395.54
  S.DA MESA MC 138 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 388,083.82
  S.DA MESA MC 138 kV TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  S.DA MESA MC 138 kV TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  S.DA MESA MC 230 kV BC 230 kV 150 Mvar S.DA MESA BC1 GO RB FT BC 230 kV 150 Mvar S.DA MESA BC1 GO 062/2001 IPCA RBNI REA 5148/2015 25/07/2018 25/07/2042 661,178.76
  S.DA MESA MC 230 kV BC 230 kV 150 Mvar S.DA MESA BC2 GO RB FT BC 230 kV 150 Mvar S.DA MESA BC2 GO 062/2001 IPCA RBNI REA 5148/2015 25/07/2018 25/07/2042 661,178.76
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 181,039.34
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 518,912.48
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 181,039.34
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 181,039.34
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 518,912.48
  S.DA MESA MC 230 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  S.DA MESA MC 230 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 181,039.34
  S.DA MESA MC 230 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 518,912.48
  S.DA MESA MC 230 kV TR 500/230 kV S.DA MESA TR2 GO RB FT TR 500/230 kV S.DA MESA TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 111,528.23
  S.DA MESA MC 500 kV CR 500 kV 107 MVAr S.DA MESA BC1 GO RB FT CR 500 kV 107 MVAr S.DA MESA BC1 GO 062/2001 IPCA RBNI REA 6370/2017 15/12/2020 15/12/2046 177,574.05
  S.DA MESA MC 500 kV RTL 500 kV 136 Mvar S.DA MESA RTSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,918.57

 

159 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  S.DA MESA MC 500 kV RTL 500 kV 136 Mvar S.DA MESA RTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,918.57
  S.DA MESA MC 500 kV RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,918.57
  S.DA MESA MC 500 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  S.DA MESA MC 500 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 463,307.16
  S.DA MESA MC 500 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,327,975.85
  S.DA MESA MC 500 kV TR 500/230 kV S.DA MESA TR2 GO RB FT TR 500/230 kV S.DA MESA TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  S.DA MESA MC 69 kV RTN 69 kV 0,5 Mvar S.DA MESA RTNSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,454.07
  S.DA MESA MC 69 kV RTN 69 kV 0,5 Mvar S.DA MESA RTNSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,454.07
  S.DA MESA MC 69 kV RTN 69 kV 0,5 Mvar S.DA MESA RTTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,454.07
  S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBNI REA 6370/2017 15/12/2020 15/12/2051 23,789.19
  S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBNI REA 5148/2015 25/07/2018 25/07/2050 119,669.60
  S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031 143,850.39
  S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RMEL REN 443/2011 12/8/2017 12/7/2032 8,363.45
  S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,025,569.41
  S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 516,341.85
  S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 838,157.17
  S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,402,407.24
  S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 516,341.85
  S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 838,157.17
  S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,402,407.24
  S.DA MESA RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO RB FT RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,273.26
  S.DA MESA RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO RB FT RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 323,472.35
  S.DA MESA RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO RB FT RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 927,167.76
  S.DA MESA RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 412,063.15
  S.DA MESA RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 668,885.72
  S.DA MESA RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,917,225.01
  S.DA MESA RTN 69 kV 0,5 Mvar S.DA MESA RTNSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,501.52
  S.DA MESA RTN 69 kV 0,5 Mvar S.DA MESA RTNSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,501.52
  S.DA MESA RTN 69 kV 0,5 Mvar S.DA MESA RTTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,501.52
  S.DA MESA TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 273,616.12
  S.DA MESA TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 444,150.17
  S.DA MESA TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,273,066.21
  S.DA MESA TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 273,616.12
  S.DA MESA TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 444,150.17
  S.DA MESA TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,273,066.21
  S.DA MESA TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 273,616.12
  S.DA MESA TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 444,150.17
  S.DA MESA TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,273,066.21
  S.DA MESA TR 230/138 kV S.DA MESA TRR1 GO RBF FT TR 230/138 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 92,175.04
  S.DA MESA TR 230/138 kV S.DA MESA TRR1 GO RBF FT TR 230/138 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 149,624.08
  S.DA MESA TR 230/138 kV S.DA MESA TRR1 GO RBF FT TR 230/138 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 428,867.02
  S.DA MESA TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,119,769.17
  S.DA MESA TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,817,676.73
  S.DA MESA TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,210,001.07
  S.DA MESA TR 500/230 kV S.DA MESA TR2 GO RB FT TR 500/230 kV S.DA MESA TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,119,769.17
  S.DA MESA TR 500/230 kV S.DA MESA TRR1 GO RB FT TR 500/230 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 372,914.63
  S.DA MESA TR 500/230 kV S.DA MESA TRR1 GO RB FT TR 500/230 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 605,337.47
  S.DA MESA TR 500/230 kV S.DA MESA TRR1 GO RB FT TR 500/230 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,735,076.88
  SAMAMBAIA BC 345 kV 150 Mvar SAMAMBAIA BC4 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 202,920.72
  SAMAMBAIA BC 345 kV 150 Mvar SAMAMBAIA BC5 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 202,920.72
  SAMAMBAIA BC 345 kV 150 Mvar SAMAMBAIA BC5 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC5 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 329,393.14
  SAMAMBAIA BC 345 kV 150 Mvar SAMAMBAIA BC5 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC5 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 944,138.50
  SAMAMBAIA CR 500 kV 252 Mvar SAMAMBAIA BC2 DF RB FT CR 500 kV 252 Mvar SAMAMBAIA BC2 DF 062/2001 IPCA RBNI REA 6247/2017 4/6/2020 4/6/2040 13,658,916.36
  SAMAMBAIA CR 500 kV 252 Mvar SAMAMBAIA BC3 DF RB FT CR 500 kV 252 Mvar SAMAMBAIA BC3 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2039 13,508,696.04
  SAMAMBAIA CR 500 kV 270 Mvar SAMAMBAIA BC1 DF RB FT CR 500 kV 270 Mvar SAMAMBAIA BC1 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2039 19,724,332.02
  SAMAMBAIA EL 138 kV SAMAMBAIA  MONJOLO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAMAMBAIA EL 138 kV SAMAMBAIA  RIACHO FUNDO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAMAMBAIA EL 138 kV SAMAMBAIA  RIO VERMELHO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAMAMBAIA EL 138 kV SAMAMBAIA  SAMAM. OESTE C1 DIT   062/2001 IPCA RCDM REA 2837/2011 4/6/2016 4/5/2045 818,872.07
  SAMAMBAIA EL 138 kV SAMAMBAIA  SAMAM. OESTE C2 DIT   062/2001 IPCA RCDM REA 2837/2011 4/6/2016 4/5/2045 826,811.94
  SAMAMBAIA EL 138 kV SAMAMBAIA  SUDOESTE DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAMAMBAIA EL 138 kV SAMAMBAIA LT 138 kV BRAS. NORTE /SAMAMBAIA C-1 DF DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,075,965.79
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,075,965.79
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,075,965.79
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBNI REA 4068/2013 11/1/2015 31/10/2043 68,022.81
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBNI REA 4068/2013 11/2/2015 11/1/2043 68,003.61
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 231,253.95
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 375,385.33
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,075,965.79
  SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 524,938.95
  SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,504,630.85
  SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 524,938.95
  SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,504,630.85
  SAMAMBAIA IB 138 kV MG 500 kV SAMAMBAIA MG1 DF IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  SAMAMBAIA IB 345 kV MG 500 kV SAMAMBAIA MG2 DF IB1 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 4068/2013 11/8/2015 11/7/2043 67,391.14
  SAMAMBAIA IB 345 kV MG 500 kV SAMAMBAIA MG2 DF IB1 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  SAMAMBAIA IB 345 kV MG 500 kV SAMAMBAIA MG2 DF IB1 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 283,511.97
  SAMAMBAIA IB 345 kV MG 500 kV SAMAMBAIA MG2 DF IB1 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 812,629.45
  SAMAMBAIA IB 500 kV MG 500 kV SAMAMBAIA MG2 DF IB2 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2047 1,478,504.08
  SAMAMBAIA IB 500 kV MG 500 kV SAMAMBAIA MG2 DF IB3 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  SAMAMBAIA IB 500 kV MG 500 kV SAMAMBAIA MG2 DF IB4 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  SAMAMBAIA MC 138 kV TR 345/138 kV SAMAMBAIA TR4 DF RBF FT TR 345/138 kV SAMAMBAIA TR4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  SAMAMBAIA MC 138 kV TR 345/138 kV SAMAMBAIA TR5 DF RBF FT TR 345/138 kV SAMAMBAIA TR5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  SAMAMBAIA MC 138 kV TR 345/138 kV SAMAMBAIA TR6 DF RBF FT TR 345/138 kV SAMAMBAIA TR6 DF 062/2001 IPCA RBNI REA 1938/2009 10/10/2012 10/9/2038 742,364.34
  SAMAMBAIA MC 138 kV TR 345/138 kV SAMAMBAIA TR8 DF RBF FT TR 345/138 kV SAMAMBAIA TR8 DF 062/2001 IPCA RBNI REA 3893/2013 29/09/2016 28/09/2045 402,987.65
  SAMAMBAIA MC 345 kV BC 345 kV 150 Mvar SAMAMBAIA BC4 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 186,115.34
  SAMAMBAIA MC 345 kV BC 345 kV 150 Mvar SAMAMBAIA BC5 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 186,115.34
  SAMAMBAIA MC 345 kV TR 345/138 kV SAMAMBAIA TR4 DF RBF FT TR 345/138 kV SAMAMBAIA TR4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  SAMAMBAIA MC 345 kV TR 345/138 kV SAMAMBAIA TR5 DF RBF FT TR 345/138 kV SAMAMBAIA TR5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  SAMAMBAIA MC 345 kV TR 345/138 kV SAMAMBAIA TR6 DF RBF FT TR 345/138 kV SAMAMBAIA TR6 DF 062/2001 IPCA RBNI REA 1938/2009 10/10/2012 10/9/2039 1,299,935.60
  SAMAMBAIA MC 345 kV TR 345/138 kV SAMAMBAIA TR8 DF RBF FT TR 345/138 kV SAMAMBAIA TR8 DF 062/2001 IPCA RBNI REA 3893/2013 29/09/2016 28/09/2046 1,835,217.94
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 915,783.21
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 319,500.48
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 915,783.21
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR3 DF RB FT TR 500/345 kV SAMAMBAIA TR3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 196,826.41
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR7 DF RB FT TR 500/345 kV SAMAMBAIA TR7 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2046 1,527,259.16
  SAMAMBAIA MC 500 kV CR 500 kV 252 Mvar SAMAMBAIA BC2 DF RB FT CR 500 kV 252 Mvar SAMAMBAIA BC2 DF 062/2001 IPCA RBNI REA 6247/2017 4/6/2020 4/6/2044 591,977.05
  SAMAMBAIA MC 500 kV CR 500 kV 252 Mvar SAMAMBAIA BC3 DF RB FT CR 500 kV 252 Mvar SAMAMBAIA BC3 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2043 711,963.96

 

160 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  SAMAMBAIA MC 500 kV CR 500 kV 270 Mvar SAMAMBAIA BC1 DF RB FT CR 500 kV 270 Mvar SAMAMBAIA BC1 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2043 627,201.03
  SAMAMBAIA MC 500 kV RTL 500 kV 136 Mvar SAMAMBAIA RTSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,918.57
  SAMAMBAIA MC 500 kV RTL 500 kV 89,1 Mvar SAMAMBAIA RTSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,918.57
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 463,307.16
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,327,975.85
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 463,307.16
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,327,975.85
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR3 DF RB FT TR 500/345 kV SAMAMBAIA TR3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR7 DF RB FT TR 500/345 kV SAMAMBAIA TR7 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2046 1,873,470.17
  SAMAMBAIA MC 69 kV RTN 69 kV 0,5 Mvar SAMAMBAIA RTNSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,454.07
  SAMAMBAIA MC 69 kV RTN 69 kV 0,5 Mvar SAMAMBAIA RTNSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,454.07
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 2837/2011 4/6/2016 4/5/2042 263,340.17
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031 365,777.57
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 3893/2013 29/09/2016 28/09/2045 592,675.57
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2043 914,705.47
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,249,552.64
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2051 305,707.82
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,028,349.08
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,813,850.53
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2051 129,958.78
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 6247/2017 4/6/2020 4/6/2052 114,104.06
  SAMAMBAIA RTL 500 kV 136 Mvar SAMAMBAIA RTSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 516,341.85
  SAMAMBAIA RTL 500 kV 136 Mvar SAMAMBAIA RTSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 838,157.17
  SAMAMBAIA RTL 500 kV 136 Mvar SAMAMBAIA RTSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,402,407.24
  SAMAMBAIA RTL 500 kV 89,1 Mvar SAMAMBAIA RTSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 444,837.41
  SAMAMBAIA RTL 500 kV 89,1 Mvar SAMAMBAIA RTSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 722,086.87
  SAMAMBAIA RTL 500 kV 89,1 Mvar SAMAMBAIA RTSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,069,715.32
  SAMAMBAIA RTN 69 kV 0,5 Mvar SAMAMBAIA RTNSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,501.52
  SAMAMBAIA RTN 69 kV 0,5 Mvar SAMAMBAIA RTNSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,501.52
  SAMAMBAIA TR 345/138 kV SAMAMBAIA TR4 DF RBF FT TR 345/138 kV SAMAMBAIA TR4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  SAMAMBAIA TR 345/138 kV SAMAMBAIA TR5 DF RBF FT TR 345/138 kV SAMAMBAIA TR5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  SAMAMBAIA TR 345/138 kV SAMAMBAIA TR6 DF RBF FT TR 345/138 kV SAMAMBAIA TR6 DF 062/2001 IPCA RBNI REA 1938/2009 10/10/2012 10/9/2041 2,460,725.13
  SAMAMBAIA TR 345/138 kV SAMAMBAIA TR8 DF RBF FT TR 345/138 kV SAMAMBAIA TR8 DF 062/2001 IPCA RBNI REA 3893/2013 29/09/2016 28/09/2049 2,700,158.01
  SAMAMBAIA TR 345/138 kV SAMAMBAIA TRR2 DF RBF FT TR 345/138 kV SAMAMBAIA TRR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,899.90
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,590,193.49
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,581,297.81
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 7,398,765.74
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,590,193.49
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 2,581,297.81
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 7,398,765.74
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR3 DF RB FT TR 500/345 kV SAMAMBAIA TR3 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2051 23,752.10
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR3 DF RB FT TR 500/345 kV SAMAMBAIA TR3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,590,193.49
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR7 DF RB FT TR 500/345 kV SAMAMBAIA TR7 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2049 5,174,148.27
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TRR1 DF RB FT TR 500/345 kV SAMAMBAIA TRR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 530,064.50
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TRR1 DF RB FT TR 500/345 kV SAMAMBAIA TRR1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 860,432.60
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TRR1 DF RB FT TR 500/345 kV SAMAMBAIA TRR1 DF 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,466,255.25
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /BRISAMAR C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /PALMARES C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /PALMARES C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /ZONA INDUSTR. C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /ZONA INDUSTR. C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /ZONA INDUSTR. C-3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /ZONA OESTE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SANTA CRUZ IB 138 kV MG 138 kV SANTA CRUZ MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  SANTA CRUZ IB 138 kV MG 138 kV SANTA CRUZ MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 108,655.46
  SANTA CRUZ IB 138 kV MG 138 kV SANTA CRUZ MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 309,511.68
  SANTA CRUZ MC 138 kV TR 13,2/138 kV SANTA CRUZ TRG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,001.78
  SANTA CRUZ MC 138 kV TR 13,2/138 kV SANTA CRUZ TRG2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,001.78
  SANTA CRUZ MC 138 kV TR 138/34,5 kV SANTA CRUZ TR12 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,001.78
  SANTA CRUZ MC 138 kV TR 138/34,5 kV SANTA CRUZ TR34 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,001.78
  SANTA CRUZ MC 138 kV TR 138/34,5 kV SANTA CRUZ TR34 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 135,522.22
  SANTA CRUZ MC 138 kV TR 138/34,5 kV SANTA CRUZ TR34 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 386,043.25
  SANTA CRUZ MC 138 kV TR 16,5/138 kV SANTA CRUZ TR11 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,001.78
  SANTA CRUZ MC 138 kV TR 16,5/138 kV SANTA CRUZ TR11 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 135,522.22
  SANTA CRUZ MC 138 kV TR 16,5/138 kV SANTA CRUZ TR11 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 386,043.25
  SANTA CRUZ MC 138 kV TR 19/138 kV SANTA CRUZ TRG3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,001.78
  SANTA CRUZ MC 138 kV TR 19/138 kV SANTA CRUZ TRG4 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,001.78
  SANTA CRUZ MC 138 kV TR 19/138 kV SANTA CRUZ TRG4 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 135,522.22
  SANTA CRUZ MC 138 kV TR 19/138 kV SANTA CRUZ TRG4 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 386,043.25
  SANTA CRUZ MG 138 kV SANTA CRUZ MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 328,417.84
  SANTA CRUZ MG 138 kV SANTA CRUZ MG1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2045 3,029.21
  SANTA CRUZ MG 138 kV SANTA CRUZ MG1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/5/2015 10/4/2028 48,337.61
  SANTA CRUZ TR 138/34,5 kV SANTA CRUZ TR12 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 102,347.47
  SANTA CRUZ TR 138/34,5 kV SANTA CRUZ TR34 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,508.97
  SAO GONCALO EL 13,8 kV SAO GONCALO  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,642.57
  SAO GONCALO EL 13,8 kV SAO GONCALO  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,642.57
  SAO GONCALO EL 13,8 kV SAO GONCALO  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,642.57
  SAO GONCALO EL 69 kV SAO GONCALO  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 48,059.28
  SAO GONCALO MC 13,8 kV TR 13,8/0,48 kV SAO GONCALO TR3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 33,617.23
  SAO GONCALO MC 13,8 kV TR 69/13,8 kV SAO GONCALO TR1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,974.62
  SAO GONCALO MC 13,8 kV TR 69/13,8 kV SAO GONCALO TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,974.62
  SAO GONCALO MC 69 kV TR 69/13,8 kV SAO GONCALO TR1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,943.46
  SAO GONCALO MC 69 kV TR 69/13,8 kV SAO GONCALO TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,943.46
  SAO GONCALO MG 69 kV SAO GONCALO MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 148,477.37
  SAO GONCALO TR 69/13,8 kV SAO GONCALO TR1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 18,896.54
  SAO GONCALO TR 69/13,8 kV SAO GONCALO TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 18,896.54
  SAO JOSE BC 138 kV 100 Mvar SAO JOSE BC2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 163,555.49
  SAO JOSE BC 138 kV 100 Mvar SAO JOSE BC2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 263,868.25
  SAO JOSE BC 138 kV 100 Mvar SAO JOSE BC4 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 163,555.49
  SAO JOSE BC 138 kV 100 Mvar SAO JOSE BC4 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 263,868.25
  SAO JOSE BC 138 kV 150 Mvar SAO JOSE BC1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 185,292.65
  SAO JOSE BC 138 kV 150 Mvar SAO JOSE BC1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 298,937.37
  SAO JOSE BC 138 kV 150 Mvar SAO JOSE BC3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 185,292.65
  SAO JOSE BC 138 kV 150 Mvar SAO JOSE BC3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 298,937.37
  SAO JOSE EL 138 kV SAO JOSE  ILHA POMBOS C1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAO JOSE EL 138 kV SAO JOSE  ROSALI DIT   062/2001 IPCA RCDM REA 2837/2011 18/06/2016 17/06/2045 829,008.49
  SAO JOSE EL 138 kV SAO JOSE  VILAR TELES C1 DIT   062/2001 IPCA RMEL REN 643/2014 9/8/2015 9/7/2040 37,557.81
  SAO JOSE EL 138 kV SAO JOSE  VILAR TELES C1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAO JOSE EL 138 kV SAO JOSE  W. LUIZ DIT   062/2001 IPCA RCDM REA 2837/2011 18/06/2016 17/06/2045 829,008.49
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CASCADURA /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CASCADURA /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CASCADURA /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CASCADURA /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 563,810.12

 

161 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 563,810.12
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 563,810.12
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 563,810.12
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV SAO JOSE /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV SAO JOSE /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV SAO JOSE /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV SAO JOSE /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV TRIAGEM /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV TRIAGEM /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV TRIAGEM /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 122,683.28
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV TRIAGEM /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 197,928.07
  SAO JOSE EL 500 kV SAO JOSE LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  SAO JOSE EL 500 kV SAO JOSE LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 524,938.95
  SAO JOSE EL 500 kV SAO JOSE LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,504,630.85
  SAO JOSE EL 500 kV SAO JOSE LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  SAO JOSE EL 500 kV SAO JOSE LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 524,938.95
  SAO JOSE EL 500 kV SAO JOSE LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,504,630.85
  SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 108,655.46
  SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB2 DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 108,655.46
  SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  SAO JOSE IB 500 kV MG 500 kV SAO JOSE MG1 RJ IB1 RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  SAO JOSE IB 500 kV MG 500 kV SAO JOSE MG1 RJ IB2 RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  SAO JOSE IB 500 kV MG 500 kV SAO JOSE MG1 RJ IB3 RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  SAO JOSE MC 138 kV BC 138 kV 150 Mvar SAO JOSE BC1 RJ BC1/BC2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,603.84
  SAO JOSE MC 138 kV BC 138 kV 150 Mvar SAO JOSE BC3 RJ BC3/BC4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,603.84
  SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 135,395.54
  SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 83,409.64
  SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 135,395.54
  SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 388,083.82
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 463,307.16
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 463,307.16
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,327,975.85
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 463,307.16
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 463,307.16
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,327,975.85
  SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 1,279.06
  SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RMEL REN 443/2011 14/03/2016 13/03/2029 8,452.49
  SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBNI REA 2837/2011 18/06/2016 17/06/2044 87,907.90
  SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBNI REA 2837/2011 18/06/2016 17/06/2044 87,907.90
  SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 917,590.64
  SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,489,488.36
  SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 4,269,315.77
  SAO JOSE TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,222,790.48
  SAO JOSE TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,984,907.12
  SAO JOSE TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,689,333.00
  SAO JOSE TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RMEL REA 5457/2015 21/11/2017 20/11/2051 1,767,372.89
  SAO JOSE TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,222,790.48
  SAO JOSE TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,984,907.12
  SAO JOSE TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 5,689,333.00
  SAO JOSE TR 500/138 kV SAO JOSE TR13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RMEL REA 5457/2015 12/12/2016 12/11/2050 4,629,091.44
  SAO JOSE TR 500/138 kV SAO JOSE TR14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RMEL REA 5457/2015 21/11/2017 20/11/2051 4,967,473.16
  SAO JOSE TR 500/138 kV SAO JOSE TRR1 RJ RBF FT TR 500/138 kV SAO JOSE TRR1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 407,596.83
  SAO JOSE TR 500/138 kV SAO JOSE TRR1 RJ RBF FT TR 500/138 kV SAO JOSE TRR1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 661,635.71
  SAO JOSE TR 500/138 kV SAO JOSE TRR1 RJ RBF FT TR 500/138 kV SAO JOSE TRR1 RJ 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,896,444.33
  SAO JOSE TT 13,8/0 kV SAO JOSE TRT11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  SAO JOSE TT 13,8/0 kV SAO JOSE TRT12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  SAO JOSE TT 13,8/0 kV SAO JOSE TRT13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  SAO JOSE TT 13,8/0 kV SAO JOSE TRT14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  TIJUCO PRETO BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,936.33
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,936.33
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 357,013.89
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,023,307.79
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,936.33
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 357,013.89
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,023,307.79
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,936.33
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 357,013.89
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,023,307.79
  TIJUCO PRETO BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,936.33
  TIJUCO PRETO BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 357,013.89
  TIJUCO PRETO BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,023,307.79
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,936.33
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,936.33
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,936.33
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,936.33
  TIJUCO PRETO CS 330/-220 MVAr TIJUCO PRETO CS1 SP RB FT CS 330/-220 MVAr TIJUCO PRETO CS1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,863,807.03
  TIJUCO PRETO CS 330/-220 MVAr TIJUCO PRETO CS1 SP RB FT CS 330/-220 MVAr TIJUCO PRETO CS1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,025,443.77
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-2 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-2 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 643/2014 8/9/2014 8/8/2043 196,225.97
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RMEL REN 443/2011 21/02/2014 20/02/2034 9,161.99
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RMEL REN 443/2011 21/02/2014 20/02/2034 9,161.99
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RMEL REN 443/2011 21/02/2014 20/02/2034 9,161.99
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 348,065.43
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 997,658.83
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 643/2014 24/08/2014 23/08/2043 196,462.60
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 348,065.43

 

162 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 2/8/2015 2/7/2036 9,473.02
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 2/8/2015 2/7/2036 9,473.02
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 2/8/2015 2/7/2036 9,473.02
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 643/2014 23/11/2014 22/11/2043 197,746.34
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-2 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-2 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 348,065.43
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 1,689,044.19
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP 007/2006 IPCA RMEL REN 443/2011 30/04/2014 29/04/2047 162,520.99
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 1,689,044.19
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-1 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 643/2014 31/08/2014 30/08/2043 196,573.03
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-1 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2036 9,487.13
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-1 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2036 9,487.13
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-1 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2036 9,487.13
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-1 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-2 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-2 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 443/2011 1/11/2015 1/10/2036 9,449.57
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-2 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 443/2011 1/11/2015 1/10/2036 9,449.57
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-2 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 443/2011 1/11/2015 1/10/2036 9,449.57
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-2 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 643/2014 17/08/2014 16/08/2043 196,352.17
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-3 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-3 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 348,065.43
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 643/2014 4/12/2015 4/11/2042 39,399.73
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 19/01/2014 18/01/2034 38,839.21
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBNI REA 2837/2011 20/01/2013 19/01/2028 16,183.39
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 524,938.95
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 323,385.58
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RMEL REN 643/2014 4/5/2015 4/4/2042 57,067.27
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RMEL REN 643/2014 9/7/2015 9/6/2036 41,034.65
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RMEL REN 643/2014 9/7/2015 9/6/2030 46,013.15
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RBNI REA 4347/2013 25/04/2017 24/04/2032 7,943.56
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBNI REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 510,170.00
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 828,138.65
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,373,691.19
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 510,170.00
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBNI REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBNI REA 5861/2016 7/9/2019 7/8/2034 9,610.19
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 643/2014 28/05/2015 27/05/2045 248,418.80
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBNI REA 5861/2016 12/7/2017 12/6/2037 11,116.03
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 510,170.00
  TIJUCO PRETO IB 345 kV MG 345 kV TIJUCO PRETO MG2 SP IB2 RB FT MG 345 kV TIJUCO PRETO MG2 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 577,113.67
  TIJUCO PRETO IB 345 kV MG 345 kV TIJUCO PRETO MG2 SP IB3 RB FT MG 345 kV TIJUCO PRETO MG2 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 577,113.67
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB1 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 3/9/2014 3/8/2043 203,862.25
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB1 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB10 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB10 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 27/07/2014 26/07/2043 203,813.55
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB11 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 15/05/2014 14/05/2043 202,702.65
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB11 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2042 23,618.35
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB11 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2042 23,618.35
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB11 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB12 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB12 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 21/05/2014 20/05/2043 190,426.16
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB13 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB4 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 14/12/2014 13/12/2044 193,286.66
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB4 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB5 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB5 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 25/05/2014 24/05/2043 202,868.01
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB6 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 8/2/2014 8/1/2043 191,423.85
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB6 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB7 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB7 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 9/8/2014 9/7/2043 191,947.20
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB8 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB9 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 11/12/2014 11/11/2043 205,380.42
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB9 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  TIJUCO PRETO IB 500 kV MG 750 kV TIJUCO PRETO MG1 SP IB1 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  TIJUCO PRETO IB 500 kV MG 750 kV TIJUCO PRETO MG1 SP IB1 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 28/09/2014 27/09/2043 234,159.98
  TIJUCO PRETO IB 500 kV MG 750 kV TIJUCO PRETO MG1 SP IB2 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  TIJUCO PRETO IB 500 kV MG 750 kV TIJUCO PRETO MG1 SP IB3 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,889.17
  TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB1 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,997.62
  TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB2 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,997.62
  TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB3 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,997.62
  TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB3 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 15/01/2015 14/01/2045 257,069.08
  TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB4 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,997.62
  TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB5 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 2010/2009 10/1/2013 30/09/2041 282,267.54
  TIJUCO PRETO MC 20 kV CS 330/-220 MVAr TIJUCO PRETO CS1 SP RB FT CS 330/-220 MVAr TIJUCO PRETO CS1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 41,586.30
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP MC1 RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,520.01
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP MC1 RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RBNI REA 5484/2015 5/8/2018 5/7/2033 85,196.40
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP MC1 RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RMEL REN 643/2014 4/5/2014 4/4/2043 210,329.33
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP MC2 RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 186,115.34
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP MC2 RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RBNI REA 5484/2015 5/8/2018 5/7/2033 85,196.40
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,520.01
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBNI REA 5484/2015 5/8/2018 5/7/2033 85,196.40
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RMEL REN 643/2014 26/02/2014 25/02/2043 199,133.83
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 186,115.34
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBNI REA 5484/2015 5/8/2018 5/7/2033 33,813.47
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RMEL REN 643/2014 13/03/2014 3/12/2043 199,338.88
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,520.01
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RBNI REA 5484/2015 5/8/2018 5/7/2033 33,813.47
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,520.01
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBNI REA 5484/2015 5/8/2018 5/7/2033 33,813.47
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RMEL REN 643/2014 5/3/2014 5/2/2043 200,088.65
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 186,115.34
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBNI REA 5484/2015 5/8/2018 5/7/2033 33,813.47
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,520.01
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RBNI REA 5484/2015 5/8/2018 5/7/2033 33,813.47
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RMEL REN 643/2014 18/04/2014 17/04/2043 199,886.87
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP 062/2001 IPCA RMEL REN 643/2014 2/1/2014 31/01/2043 214,392.03
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,520.01
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP 062/2001 IPCA RBNI REA 5484/2015 5/8/2018 5/7/2033 33,813.47
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,520.01
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP 062/2001 IPCA RBNI REA 5484/2015 5/8/2018 5/7/2033 33,813.47
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP 062/2001 IPCA RMEL REN 643/2014 23/03/2014 22/03/2043 214,602.61
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RMEL REN 643/2014 12/6/2014 12/5/2044 203,264.25
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,520.01
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RBNI REA 5484/2015 5/8/2018 5/7/2033 33,813.47
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 186,115.34
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RBNI REA 5484/2015 5/8/2018 5/7/2033 33,813.47
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RMEL REN 643/2014 27/02/2014 26/02/2043 214,547.85
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP 062/2001 IPCA RMEL REN 643/2014 27/02/2014 26/02/2043 214,547.85

 

 

163 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,520.01
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP 062/2001 IPCA RBNI REA 5484/2015 5/8/2018 5/7/2033 85,196.40
  TIJUCO PRETO MC 345 kV RTB 345 kV 0 Mvar TIJUCO PRETO RLCCA SP RB FT RTB 345 kV 0 Mvar TIJUCO PRETO RLCCA SP 062/2001 IPCA RBNI REA 1410/2008 28/12/2012 27/12/2037 202,733.01
  TIJUCO PRETO MC 345 kV RTB 345 kV 0 Mvar TIJUCO PRETO RLCCB SP RB FT RTB 345 kV 0 Mvar TIJUCO PRETO RLCCB SP 062/2001 IPCA RBNI REA 1410/2008 28/12/2012 27/12/2037 202,733.01
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2043 223,031.13
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,996.14
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,996.14
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 292,180.57
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RMEL REN 443/2011 19/10/2014 18/10/2035 9,378.09
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR6 SP RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,996.14
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR7 SP RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RBNI REA 2010/2009 28/11/2014 27/11/2042 566,868.62
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 463,307.16
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,327,975.85
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 3/6/2015 3/5/2036 13,461.81
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 643/2014 5/10/2015 5/9/2042 42,790.46
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 643/2014 16/09/2014 15/09/2043 257,597.70
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 643/2014 26/04/2015 25/04/2042 42,754.34
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 643/2014 5/3/2015 5/2/2042 42,765.27
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 643/2014 3/8/2015 3/7/2036 40,393.96
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 443/2011 3/8/2015 3/7/2036 13,464.66
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 443/2011 3/8/2015 3/7/2036 13,464.66
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 443/2011 3/8/2015 3/7/2036 13,464.66
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 463,307.16
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,327,975.85
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,417.68
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RMEL REN 443/2011 22/03/2015 21/03/2039 6,159.80
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RMEL REN 443/2011 22/03/2015 21/03/2039 6,159.80
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RMEL REN 643/2014 22/03/2015 21/03/2036 43,254.53
  TIJUCO PRETO MC 69 kV RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP 062/2001 IPCA RMEL REN 443/2011 9/9/2014 9/8/2034 6,065.76
  TIJUCO PRETO MC 69 kV RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  TIJUCO PRETO MC 69 kV RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,104.13
  TIJUCO PRETO MC 69 kV RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2014 15/10/2035 6,087.49
  TIJUCO PRETO MC 750 kV RTL 750 kV 329 Mvar TIJUCO PRETO RIATP1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 54,079.47
  TIJUCO PRETO MC 750 kV RTL 750 kV 329 Mvar TIJUCO PRETO RIATP2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 54,079.47
  TIJUCO PRETO MC 750 kV RTL 750 kV 329 Mvar TIJUCO PRETO RIATP3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 54,079.47
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 449,324.09
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 449,324.09
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 729,369.91
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,090,590.66
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RMEL REN 443/2011 19/10/2014 18/10/2035 58,459.22
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR6 SP RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RMEL REN 443/2011 6/1/2014 31/05/2034 57,692.57
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR6 SP RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 449,324.09
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR7 SP RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RMEL REN 443/2011 21/10/2014 20/10/2035 58,471.98
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR7 SP RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RBNI REA 2010/2009 28/11/2014 27/11/2043 948,466.58
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 449,324.09
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 729,369.91
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,090,590.66
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 2/1/2015 31/01/2036 19,669.01
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 2/1/2015 31/01/2036 19,669.01
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 2/1/2015 31/01/2036 19,669.01
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2039 5,683.62
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 23/02/2015 22/02/2039 5,683.92
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 643/2014 19/10/2014 18/10/2043 273,235.90
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034 57,647.00
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 449,324.09
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 729,369.91
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,090,590.66
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 449,324.09
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RMEL REN 643/2014 2/1/2015 31/01/2040 17,608.97
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 1410/2008 11/4/2015 11/3/2043 582,599.87
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 1410/2008 11/4/2015 11/3/2044 2,357,986.81
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029 3,260.36
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2045 913.29
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 8314/2019 7/9/2019 7/8/2034 9,610.19
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 2010/2009 10/1/2013 30/09/2047 154,978.70
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,373,636.13
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,853,029.07
  TIJUCO PRETO RTB 345 kV 0 Mvar TIJUCO PRETO RLCCA SP RB FT RTB 345 kV 0 Mvar TIJUCO PRETO RLCCA SP 062/2001 IPCA RBNI REA 1410/2008 28/12/2012 27/12/2042 164,914.09
  TIJUCO PRETO RTB 345 kV 0 Mvar TIJUCO PRETO RLCCB SP RB FT RTB 345 kV 0 Mvar TIJUCO PRETO RLCCB SP 062/2001 IPCA RBNI REA 1410/2008 28/12/2012 27/12/2042 164,914.03
  TIJUCO PRETO RTB 345 kV 66,33 Mvar TIJUCO PRETO RLCCR SP RB FT RTB 345 kV 66,33 Mvar TIJUCO PRETO RLCCR SP 062/2001 IPCA RMEL REN 643/2014 15/02/2013 14/02/2049 34,201.28
  TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,335.61
  TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 245,657.07
  TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 704,126.08
  TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,335.61
  TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 245,657.07
  TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 704,126.08
  TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,337,167.01
  TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 717,246.83
  TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,164,278.23
  TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 717,246.83
  TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,164,278.23
  TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 3,337,167.01
  TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 717,246.83
  TIJUCO PRETO RTL 750 kV 360 Mvar TIJUCO PRETO RIATPR SP RB FT RTL 750 kV 360 Mvar TIJUCO PRETO RIATPR SP 062/2001 IPCA RMEL REN 643/2014 19/12/2013 18/12/2045 2,024,449.03
  TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREG1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 643/2014 22/03/2015 21/03/2036 40,453.72
  TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREG1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,530,471.13
  TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREG2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,530,471.13
  TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREG2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 443/2011 12/7/2014 12/6/2035 40,064.43
  TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREG3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,530,471.13
  TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREGR1 SP RB FT TR 750/500 kV TIJUCO PRETO TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 510,157.04
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,908,667.98
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,098,264.77
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,908,667.98
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,098,264.77
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 8,880,546.48
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR6 SP RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,908,667.98
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR7 SP RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RBNI REA 2010/2009 28/11/2014 27/11/2045 5,488,828.71
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TRR2 SP RB FT TR 750/345 kV TIJUCO PRETO TRR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 636,222.66
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TRR2 SP RB FT TR 750/345 kV TIJUCO PRETO TRR2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,032,754.92
  TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,043,595.70
  TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,317,287.58
  TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,043,595.70
  TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 3,317,287.58
  TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 9,508,330.88
  TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,043,595.70

 

 

164 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TRR1 SP RB FT TR 750/500 kV TIJUCO PRETO TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 681,198.57
  TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TRR1 SP RB FT TR 750/500 kV TIJUCO PRETO TRR1 SP 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,105,762.53
  TIJUCO PRETO TR 765/345 kV TIJUCO PRETO TRR3 SP RB FT TR 750/345 kV TIJUCO PRETO TRR3 SP 062/2001 IPCA RBNI REA 3698/2012 21/03/2016 20/03/2049 1,909,152.75
  TIJUCO PRETO TT 20/0,22 kV TIJUCO PRETO TT4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  TIJUCO PRETO TT 69/0,22 kV TIJUCO PRETO TT1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  TIJUCO PRETO TT 69/0,22 kV TIJUCO PRETO TT2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  TIJUCO PRETO TT 69/0,22 kV TIJUCO PRETO TT3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RMEL REN 443/2011 11/2/2014 11/1/2038 4,433.71
  TIJUCO PRETO TT 69/0,22 kV TIJUCO PRETO TT3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  U.MASCARENHAS EL 230 kV U.MASCARENHAS LT 230 kV U.MASCARENHAS /LINHARES C-1 ES RB FT LT 230 kV U.MASCARENHAS /LINHARES C-1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 7/12/2040 511,053.04
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG1 GO DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 463,740.62
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG1 GO DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,320,993.28
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG2 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG2 GO DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 463,740.62
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG2 GO DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,320,993.28
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG3 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 287,443.92
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG3 GO DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 463,740.62
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG3 GO DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 1,320,993.28
  UHE S.DA MESA MG 500 kV UHE S.DA MESA MG1 GO RB FT MG 500 kV UHE S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 555,529.03
  UHE S.DA MESA MG 500 kV UHE S.DA MESA MG1 GO RB FT MG 500 kV UHE S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 901,768.17
  UHE S.DA MESA MG 500 kV UHE S.DA MESA MG1 GO RB FT MG 500 kV UHE S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,584,735.23
  USI CAMPOS EL 138 kV USI CAMPOS  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,368.34
  USI CAMPOS EL 138 kV USI CAMPOS  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,368.34
  USI CAMPOS EL 138 kV USI CAMPOS  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,368.34
  USI CAMPOS EL 138 kV USI CAMPOS  DIST3 DIT   062/2001 IPCA RCDM REA 2376/2010 6/1/2014 31/05/2040 39,050.23
  USI CAMPOS EL 138 kV USI CAMPOS  DIST3 DIT   062/2001 IPCA RMEL REN 643/2014 28/02/2016 27/02/2044 22,966.77
  USI CAMPOS EL 138 kV USI CAMPOS  DIST3 DIT   062/2001 IPCA RMEL REN 643/2014 10/12/2016 10/11/2045 33,777.97
  USI CAMPOS EL 138 kV USI CAMPOS  DIST4 DIT   062/2001 IPCA RMEL REN 643/2014 31/01/2016 30/01/2044 56,146.75
  USI CAMPOS EL 138 kV USI CAMPOS  DIST4 DIT   062/2001 IPCA RCDM REA 2376/2010 26/05/2014 25/05/2040 39,029.23
  USI CAMPOS EL 138 kV USI CAMPOS  DIST4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,368.34
  USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,368.34
  USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 19/06/2016 18/06/2044 79,802.54
  USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 19/06/2016 18/06/2047 102,844.18
  USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 25/09/2016 24/09/2044 57,033.06
  USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 23/09/2016 22/09/2044 23,282.07
  USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,368.34
  USI CAMPOS EL 69 kV USI CAMPOS  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,826.78
  USI CAMPOS EL 69 kV USI CAMPOS  DIST1 DIT   062/2001 IPCA RCDM REA 1814/2009 3/10/2013 3/9/2040 104,635.54
  USI CAMPOS EL 69 kV USI CAMPOS  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,826.78
  USI CAMPOS EL 69 kV USI CAMPOS  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,826.78
  USI CAMPOS EL 69 kV USI CAMPOS  DIST4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,826.78
  USI CAMPOS IB 138 kV MG 138 kV USI CAMPOS MG1 RJ IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  USI CAMPOS IB 138 kV MG 138 kV USI CAMPOS MG1 RJ IB2 DIT   062/2001 IPCA RCDM REA 1814/2009 15/04/2016 14/04/2047 125,506.17
  USI CAMPOS IB 138 kV MG 138 kV USI CAMPOS MG1 RJ IB2 DIT   062/2001 IPCA RMEL REN 643/2014 26/02/2015 25/02/2042 46,735.71
  USI CAMPOS IB 69 kV MG 138 kV USI CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RCDM REA 1814/2009 9/10/2015 9/9/2042 9,878.27
  USI CAMPOS IB 69 kV MG 138 kV USI CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RCDM REA 1814/2009 9/10/2015 9/9/2042 9,878.27
  USI CAMPOS IB 69 kV MG 138 kV USI CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RCDM REA 1814/2009 6/11/2016 6/10/2047 97,830.82
  USI CAMPOS IB 69 kV MG 138 kV USI CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 29,220.92
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 80,844.31
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 20/07/2015 19/07/2042 46,821.94
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 23/08/2015 22/08/2042 46,937.71
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RCDM REN 443/2011 12/11/2015 12/10/2046 98,669.98
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 80,844.31
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 80,844.31
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 30/06/2025 130,428.18
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 7/1/2017 31/12/2042 371,532.60
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 19/10/2014 18/10/2044 101,637.03
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 9/10/2015 9/9/2042 10,801.71
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 9/10/2015 9/9/2042 10,801.71
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 9/10/2015 9/9/2045 21,202.92
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,243.63
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,243.63
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR2 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 26/07/2014 25/07/2043 101,022.04
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR2 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 26/07/2014 25/07/2040 41,904.50
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,243.63
  USI CAMPOS MG 138 kV USI CAMPOS MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 290,101.75
  USI CAMPOS TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 73,720.97
  USI CAMPOS TR 138/69 kV USI CAMPOS TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 73,720.97
  VENDA PEDRAS EL 345 kV VENDA PEDRAS LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBNI REA 5538/2015 7/1/2016 31/12/2042 819,744.23
  VENDA PEDRAS EL 345 kV VENDA PEDRAS LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBNI REA 5538/2015 7/1/2016 31/12/2042 819,744.23
  VIANA EL 138 kV VIANA  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 119,525.81
  VIANA EL 138 kV VIANA  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 119,525.81
  VIANA EL 138 kV VIANA  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 119,525.81
  VIANA EL 138 kV VIANA  DIST4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 119,525.81
  VIANA EL 138 kV VIANA  DIST5 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 119,525.81
  VIANA EL 138 kV VIANA  DIST6 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 119,525.81
  VIANA EL 345 kV VIANA LT 345 kV CAMPOS /VIANA C-1 RJ/ES RB FT LT 345 kV CAMPOS /VIANA C-1 RJ/ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  VIANA EL 345 kV VIANA LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  VIANA IB 138 kV MG 345 kV VIANA MG1 ES IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,348.75
  VIANA IB 345 kV MG 345 kV VIANA MG1 ES IB1 RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  VIANA IB 345 kV MG 345 kV VIANA MG1 ES IB2 RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  VIANA IB 345 kV MG 345 kV VIANA MG1 ES IB3 RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  VIANA MC 138 kV TR 345/138 kV VIANA TR1 ES RBF FT TR 345/138 kV VIANA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 80,274.42
  VIANA MC 138 kV TR 345/138 kV VIANA TR2 ES RBF FT TR 345/138 kV VIANA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 80,274.42
  VIANA MC 138 kV TR 345/138 kV VIANA TR3 ES RBF FT TR 345/138 kV VIANA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 80,274.42
  VIANA MC 138 kV TR 345/138 kV VIANA TR4 ES RBF FT TR 345/138 kV VIANA TR4 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2042 554,351.41
  VIANA MC 345 kV RTL 345 kV 60 Mvar VIANA RT1 ES RB FT RTL 345 kV 60 Mvar VIANA RT1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 110,704.01
  VIANA MC 345 kV RTL 345 kV 60 Mvar VIANA RT1 ES RB FT RTL 345 kV 60 Mvar VIANA RT1 ES 062/2001 IPCA RMEL REN 443/2011 21/11/2014 20/11/2044 248,319.46
  VIANA MC 345 kV RTL 345 kV 60 Mvar VIANA RT1 ES RB FT RTL 345 kV 60 Mvar VIANA RT1 ES 062/2001 IPCA RMEL REN 443/2011 21/11/2014 20/11/2041 37,881.66
  VIANA MC 345 kV TR 345/138 kV VIANA TR1 ES RBF FT TR 345/138 kV VIANA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,996.14
  VIANA MC 345 kV TR 345/138 kV VIANA TR2 ES RBF FT TR 345/138 kV VIANA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,996.14
  VIANA MC 345 kV TR 345/138 kV VIANA TR3 ES RBF FT TR 345/138 kV VIANA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 179,996.14
  VIANA MC 345 kV TR 345/138 kV VIANA TR4 ES RBF FT TR 345/138 kV VIANA TR4 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2046 1,103,940.48
  VIANA MG 345 kV VIANA MG1 ES RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 750,378.30
  VIANA MG 345 kV VIANA MG1 ES RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2050 40,032.68
  VIANA MG 345 kV VIANA MG1 ES RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2038 367,868.56
  VIANA MG 345 kV VIANA MG1 ES RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 5,121.33
  VIANA RTL 345 kV 60 Mvar VIANA RT1 ES RB FT RTL 345 kV 60 Mvar VIANA RT1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,524.42
  VIANA RTL 345 kV 60 Mvar VIANA RT1 ES RB FT RTL 345 kV 60 Mvar VIANA RT1 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 275,182.25
  VIANA TR 345/138 kV VIANA TR1 ES RBF FT TR 345/138 kV VIANA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  VIANA TR 345/138 kV VIANA TR2 ES RBF FT TR 345/138 kV VIANA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  VIANA TR 345/138 kV VIANA TR3 ES RBF FT TR 345/138 kV VIANA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  VIANA TR 345/138 kV VIANA TR4 ES RBF FT TR 345/138 kV VIANA TR4 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2054 4,020,116.49
  VIANA TR 345/138 kV VIANA TRR1 ES RBF FT TR 345/138 kV VIANA TRR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,899.90
  VIANA TR 345/138 kV VIANA TRR4 ES RBF FT TR 345/138 kV VIANA TRR4 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2054 1,340,038.83
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC1 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC1 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC1 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,523.97
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC1 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC1 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 179,212.26
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC10 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC10 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC11 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC11 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53

 

 

165 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  VITORIA BC 13,8 kV 10 MVAr VITORIA BC12 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC12 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC2 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC2 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC2 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,523.97
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC2 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC2 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 179,212.26
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC3 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC3 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC3 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,523.97
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC3 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC3 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 179,212.26
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC4 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC4 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC5 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC5 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC6 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC6 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC7 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC7 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC7 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC7 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,523.97
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC7 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC7 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 179,212.26
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC8 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC8 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC8 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC8 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,523.97
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC8 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC8 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 179,212.26
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC9 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC9 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,517.53
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC9 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC9 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 62,523.97
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC9 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC9 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 179,212.26
  VITORIA CS 60/-30 MVAr VITORIA CS1 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 674,747.83
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-1 ES DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 80,780.80
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-1 ES DIT   062/2001 IPCA RMEL REN 643/2014 6/5/2016 6/4/2044 39,287.93
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-1 ES DIT   062/2001 IPCA RMEL REN 643/2014 4/3/2016 4/2/2044 28,349.90
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-2 ES DIT   062/2001 IPCA RMEL REN 643/2014 19/06/2016 18/06/2044 39,331.26
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-2 ES DIT   062/2001 IPCA RMEL REN 643/2014 14/03/2016 13/03/2044 28,315.57
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-2 ES DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 80,780.80
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-3 ES DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 80,780.80
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-3 ES DIT   062/2001 IPCA RMEL REN 443/2011 18/05/2017 17/05/2040 4,242.96
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-3 ES DIT   062/2001 IPCA RCDM REA 1814/2009 6/3/2012 6/2/2036 55,016.42
  VITORIA EL 345 kV VITORIA LT 345 kV CAMPOS /VITORIA C-1 RJ/ES RB FT LT 345 kV CAMPOS /VITORIA C-1 RJ/ES 062/2001 IPCA RBNI REA 2040/2009 4/6/2015 4/5/2036 26,116.32
  VITORIA EL 345 kV VITORIA LT 345 kV CAMPOS /VITORIA C-1 RJ/ES RB FT LT 345 kV CAMPOS /VITORIA C-1 RJ/ES 062/2001 IPCA RMEL REN 643/2014 18/05/2015 17/05/2042 45,524.61
  VITORIA EL 345 kV VITORIA LT 345 kV CAMPOS /VITORIA C-1 RJ/ES RB FT LT 345 kV CAMPOS /VITORIA C-1 RJ/ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  VITORIA EL 345 kV VITORIA LT 345 kV CAMPOS /VITORIA C-1 RJ/ES RB FT LT 345 kV CAMPOS /VITORIA C-1 RJ/ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 348,065.43
  VITORIA EL 345 kV VITORIA LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  VITORIA EL 345 kV VITORIA LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RMEL REN 643/2014 23/07/2015 22/07/2042 63,128.22
  VITORIA EL 345 kV VITORIA LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RMEL REN 643/2014 15/06/2016 14/06/2044 46,782.99
  VITORIA EL 345 kV VITORIA LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RMEL REN 643/2014 23/07/2015 22/07/2045 194,436.66
  VITORIA EL 345 kV VITORIA LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RBNI REA 2040/2009 4/6/2015 4/5/2036 26,116.32
  VITORIA EL 345 kV VITORIA LT 345 kV VITORIA /PADRE FIALHO C-1 ES/MG RB FT LT 345 kV VITORIA /PADRE FIALHO C-1 ES/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,423.68
  VITORIA IB 345 kV MG 345 kV VITORIA MG1 ES IB1 RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  VITORIA IB 345 kV MG 345 kV VITORIA MG1 ES IB2 RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,655.90
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC1 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,741.00
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC10 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC10 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,130.68
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC11 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC11 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,130.68
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC12 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC12 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,130.68
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC2 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,130.68
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC3 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,130.68
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC4 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC4 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,130.68
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC5 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC5 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,130.68
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC6 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC6 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,130.68
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC7 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC7 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,130.68
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC8 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC8 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,130.68
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC9 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC9 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,130.68
  VITORIA MC 13,8 kV CS 60/-30 MVAr VITORIA CS1 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 41,586.30
  VITORIA MC 13,8 kV TR 345/13,8 kV VITORIA TRSC01 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,756.28
  VITORIA MC 13,8 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,551.34
  VITORIA MC 13,8 kV TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,551.34
  VITORIA MC 13,8 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,551.34
  VITORIA MC 13,8 kV TR 345/138 kV VITORIA TR4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,756.28
  VITORIA MC 138 kV TR 345/138 kV VITORIA TR4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 70,868.78
  VITORIA MC 138 kV TR 345/138 kV VITORIA TR5 ES RBF FT TR 345/138 kV VITORIA TR5 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2043 782,495.87
  VITORIA MC 345 kV RTB 345 kV 60 Mvar VITORIA RT2 ES RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 149,133.45
  VITORIA MC 345 kV RTB 345 kV 60 Mvar VITORIA RT2 ES RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RMEL REN 643/2014 23/12/2014 22/12/2044 207,313.47
  VITORIA MC 345 kV RTB 345 kV 60 Mvar VITORIA RT2 ES RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RMEL REN 643/2014 17/05/2015 16/05/2042 30,783.91
  VITORIA MC 345 kV RTL 345 kV 60 Mvar VITORIA RT3 ES RB FT RTL 345 kV 60 Mvar VITORIA RT3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 110,704.01
  VITORIA MC 345 kV TR 345/13,8 kV VITORIA TRSC01 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RMEL REN 643/2014 9/12/2015 9/11/2042 33,068.84
  VITORIA MC 345 kV TR 345/13,8 kV VITORIA TRSC01 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,877.13
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,877.13
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 280,624.56
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RMEL REN 443/2011 18/05/2017 17/05/2040 10,111.04
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RMEL REN 443/2011 23/07/2017 22/07/2040 10,157.59
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RMEL REN 443/2011 23/07/2017 22/07/2040 10,157.59
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RMEL REN 643/2014 7/3/2015 7/2/2042 65,795.95
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RMEL REN 643/2014 7/3/2015 7/2/2045 232,477.56
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,877.13
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,877.13
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 643/2014 30/09/2014 29/09/2043 228,132.66
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 643/2014 11/6/2014 11/5/2041 32,319.81
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 643/2014 11/10/2014 11/9/2041 32,331.03
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 643/2014 19/11/2014 18/11/2041 32,356.30
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 643/2014 1/10/2016 1/9/2044 33,345.31
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 443/2011 8/6/2017 8/5/2040 10,163.48
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 443/2011 8/6/2017 8/5/2040 10,163.48
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 443/2011 8/6/2017 8/5/2040 10,163.48
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RMEL REN 643/2014 26/09/2014 25/09/2043 235,040.54
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,877.13
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR5 ES RBF FT TR 345/138 kV VITORIA TR5 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2046 1,239,721.58
  VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 718,810.86
  VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,166,817.07
  VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2048 1,125,395.36
  VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2051 415,756.05
  VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 9,342.04
  VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBNI REA 4347/2013 31/10/2017 30/10/2045 9,465.68
  VITORIA RTB 345 kV 60 Mvar VITORIA RT2 ES RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,392.31
  VITORIA RTB 345 kV 60 Mvar VITORIA RT2 ES RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 554,168.56
  VITORIA RTB 345 kV 60 Mvar VITORIA RT2 ES RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,588,411.58
  VITORIA RTL 345 kV 60 Mvar VITORIA RT3 ES RB FT RTL 345 kV 60 Mvar VITORIA RT3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,392.31
  VITORIA TR 345/13,8 kV VITORIA TRSC01 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,726.82
  VITORIA TR 345/13,8 kV VITORIA TRSC01 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 359,920.32
  VITORIA TR 345/13,8 kV VITORIA TRSC01 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 1,031,638.48
  VITORIA TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  VITORIA TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBNI REA 5484/2015 11/8/2015 11/7/2041 88,733.19
  VITORIA TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,022,166.47
  VITORIA TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  VITORIA TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBNI REA 5484/2015 20/12/2015 19/12/2041 103,855.93
  VITORIA TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,022,166.47

 

 

166 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  VITORIA TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  VITORIA TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBNI REA 5484/2015 1/10/2016 1/9/2042 103,999.76
  VITORIA TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 1,022,166.47
  VITORIA TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 31/12/2042 2,929,832.51
  VITORIA TR 345/138 kV VITORIA TR4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 629,699.70
  VITORIA TR 345/138 kV VITORIA TR4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBNI REA 5484/2015 10/12/2015 10/11/2041 109,803.70
  VITORIA TR 345/138 kV VITORIA TR5 ES RBF FT TR 345/138 kV VITORIA TR5 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2055 3,966,078.70
  VITORIA TR 345/138 kV VITORIA TRR1 ES RBF FT TR 345/138 kV VITORIA TRR1 ES 062/2001 IPCA RMEL REN 443/2011 11/10/2016 11/9/2039 9,975.78
  VITORIA TR 345/138 kV VITORIA TRR1 ES RBF FT TR 345/138 kV VITORIA TRR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,899.90
  VITORIA TR 345/138 kV VITORIA TRR1 ES RBF FT TR 345/138 kV VITORIA TRR1 ES 062/2001 IPCA RBSE PRT 120/2016 7/1/2017 30/06/2025 340,722.16
  VITORIA TR 345/138 kV VITORIA TRR2 ES RBF FT TR 345/138 kV VITORIA TRR2 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2055 1,322,026.22
  VITORIA TT 13,8/0 kV VITORIA TRT1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  VITORIA TT 13,8/0 kV VITORIA TRT2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  VITORIA TT 13,8/0 kV VITORIA TRT3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  VITORIA TT 13,8/0 kV VITORIA TRT4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,909.01
  XAVANTES EL 230 kV XAVANTES LT 230 kV PIRINEUS /XAVANTES C-2 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-2 GO 014/2011 IPCA RBL CC 014/2011 6/8/2018 12/9/2041 546,868.56
  ZONA OESTE EL 138 kV ZONA OESTE LT 138 kV SANTA CRUZ /ZONA OESTE C-1 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2045 939,698.06
  ZONA OESTE EL 138 kV ZONA OESTE LT 138 kV SANTA CRUZ /ZONA OESTE C-2 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2045 939,698.06
  ZONA OESTE EL 138 kV ZONA OESTE LT 138 kV ZONA OESTE /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2046 913,374.80
  ZONA OESTE EL 138 kV ZONA OESTE LT 138 kV ZONA OESTE /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2046 913,374.80
  ZONA OESTE IB 138 kV MG 500 kV ZONA OESTE MG2 RJ IB1 DIT   016/2012 IPCA RPEC CC 016/2012 24/03/2016 5/10/2042 227,310.51
  ZONA OESTE IB 500 kV MG 500 kV ZONA OESTE MG2 RJ IB3 RB FT MG 500 kV ZONA OESTE MG2 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 5/10/2042 1,026,350.31
  ZONA OESTE MC 138 kV TR 500/138 kV ZONA OESTE TR1 RJ RBF FT TR 500/138 kV ZONA OESTE TR1 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 5/10/2042 271,044.24
  ZONA OESTE MC 500 kV TR 500/138 kV ZONA OESTE TR1 RJ RBF FT TR 500/138 kV ZONA OESTE TR1 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 5/10/2042 960,620.06
  ZONA OESTE MG 138 kV ZONA OESTE MG1 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2045 301,099.08
  ZONA OESTE MG 500 kV ZONA OESTE MG2 RJ RB FT MG 500 kV ZONA OESTE MG2 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 5/10/2042 1,649,277.22
  ZONA OESTE MG 500 kV ZONA OESTE MG2 RJ RB FT MG 500 kV ZONA OESTE MG2 RJ 016/2012 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 1,716.31
  ZONA OESTE TR 500/138 kV ZONA OESTE TR1 RJ RBF FT TR 500/138 kV ZONA OESTE TR1 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 5/10/2042 4,578,456.14
  ZONA OESTE TR 500/138 kV ZONA OESTE TRR1 RJ RBF FT TR 500/138 kV ZONA OESTE TRR1 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 5/10/2042 1,526,152.63
                      11,291,894,368.32

 

 

167 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

       
V. Employees  - Effective Workforce
       
V.1 By Segment
Eletrobras companies Administrative Operational Total
Cepel 47 214 261
CGT Eletrosul                                               416                                               923                                            1,339
Chesf                                               893                                             2,191                                            3,084
Eletrobras                                               669                                                 -                                                  669
Eletronorte                                               757                                            1,570                                            2,327
Eletronuclear                                               408                                            1,233                                             1,641
Furnas                                            1,030                                            1,772                                            2,802
Grand Total                               4,220                               7,903                              12,123
Eletropar                                                   3                                                 -                                                      3
Itaipu                                               940                                               367                                            1,307
Total including Itaipu and Eletropar                                5,163                               8,270                              13,433
       
Effective Framework Concept:
Employees in the company
Groups: External Advisor + Employees + Employees Managers + Employees requisitioned from other companies + Employees requisitioned from other companies Managers
It includes: amnestied employees in the company
It does not include: Employee director, statutory director, assigned, disability retirees and unpaid leave

 

 

168 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

  Eletrobras Companies Investments in 2020
  * Source: Controlling and Finance Department (DFPC)
                         
  VII.1 Corporate Investment and Partnerships - R$ Million
  Generation  1Q21   2Q21   3Q21   4Q21  Total Realized Budgeted up to 06/2021 PDNG Budget 1Q21 PDNG Budget 2Q21 PDNG Budget 3Q21 PDNG Budget 4Q21 PDNG Budget 2021
    Eletrobras                   -                    -                        0.0                      -                              0.0                 62.9                      13.3                   49.6                      -                         -                             62.9
    Eletronorte                 2.9             25.7                   20.4                   65.6                        114.6               260.6                      37.2                   32.1                   39.7                  151.6                        260.6
    Chesf               28.6             32.8                   32.8                 107.0                        201.1               279.9                      55.0                   50.1                   60.2                  114.6                        279.9
    Furnas               59.2            147.0                   66.2                 145.2                       417.5               964.9                      72.4                 105.6                  211.2                 575.7                        964.9
    Eletronuclear             222.9             311.5                 444.9                 541.5                    1,520.8            3,352.8                    614.3                 585.2                 865.5              1,287.8                     3,352.8
    Eletrosul                 0.7               11.8                     7.2                   13.0                         32.7                143.7                      17.3                   31.7                   41.4                   53.2                         143.7
                         
  Generation - Implementation  1Q21   2Q21   3Q21   4Q21  Total Realized Budgeted up to 06/2021 PDNG Budget 1Q21 PDNG Budget 2Q21 PDNG Budget 3Q21 PDNG Budget 4Q21 PDNG Budget 2021
   Eletrobras                  -                    -                          -                         -                               -                        -                            -                         -                         -                                   -   
   Eletronorte                  -                    -                          -                         -                               -                        -                            -                         -                         -                                   -   
   Chesf                 1.2               2.6                      7.1                     7.3                         18.2                 80.8                        2.2                    11.0                   14.5                   53.1                          80.8
   Furnas                0.0                0.1                     0.0                     0.1                           0.3                     -                            -                         -                         -                         -                                 -   
   Eletronuclear             132.9           249.7                 374.5                 482.8                    1,239.9             2,813.4                    481.7                  461.1                 707.9               1,162.6                      2,813.4
   CGT Eletrosul                  -                    -                          -                         -                               -                        -                            -                         -                         -                         -                                 -   
   Amazonas GT                  -                    -                          -                         -                               -                        -                            -                         -                         -                         -                                 -   
                         
                         
  Generation - Expansion  1Q21   2Q21   3Q21   4Q21  Total Realized Budgeted up to 06/2021 PDNG Budget 1Q21 PDNG Budget 2Q21 PDNG Budget 3Q21 PDNG Budget 4Q21 PDNG Budget 2021
   Eletrobras                 1.2              10.5                    12.3                   28.9                         52.9                 64.7                        7.1                   16.6                   25.5                   15.6                          64.7
   Eletronorte                  -                    -                          -                         -                               -                        -                            -                         -                         -                         -                                 -   
   Chesf                9.2             64.6                   35.0                   78.7                       187.4                210.2                      41.9                   42.3                 102.7                   23.3                         210.2
   Furnas                  -                    -                          -                         -                               -               
   Eletronuclear                0.4                1.3                      1.6                     0.1                           3.5                    4.1                        2.4                     1.7                      -                         -                                4.1
   CGT Eletrosul                  -                    -                          -                         -                               -                        -                             -                                   -   
   Amazonas GT                  -                    -                          -                         -                               -                        -                             -                                   -   
                         
                         
  Generation - Maintenance  1Q21   2Q21   3Q21   4Q21  Total Realized Budgeted up to 06/2021 PDNG Budget 1Q21 PDNG Budget 2Q21 PDNG Budget 3Q21 PDNG Budget 4Q21 PDNG Budget 2021
    Eletrobras                   -                    -                          -                         -                               -                        -                             -                                   -   
    Eletronorte                  1.7              15.2                      8.1                   36.8                         61.7                174.3                      24.3                   15.5                   13.5                  121.0                         174.3
    Chesf                 6.7             30.2                   25.7                   99.7                       162.2                178.4                      32.1                   39.1                   45.8                   61.5                         178.4
    Furnas                31.4             42.7                   29.2                   55.5                       158.8                 174.1                        8.0                   40.7                   57.6                   67.8                          174.1
    Eletronuclear               90.0              61.9                   70.4                   58.7                       280.9               539.4                    132.6                  124.1                 157.6                 125.2                        539.4
    CGT Eletrosul                 0.3                2.1                     5.6                     1.9                           9.9                  71.6                        1.9                    17.1                   12.4                   40.3                           71.6
   Amazonas GT                  -                    -                          -                         -                               -               
                         
                         
  Generation -  Partnerships*  1Q21   2Q21   3Q21   4Q21  Total Realized Budgeted up to 06/2021 PDNG Budget 1Q21 PDNG Budget 2Q21 PDNG Budget 3Q21 PDNG Budget 4Q21 PDNG Budget 2021
    Eletrobras                   -                    -                        0.0                      -                              0.0                 62.9                      13.3                   49.6                      -                         -                             62.9
    Eletronorte                   -                    -                          -                         -                               -                     21.6                        5.8                      -                        0.8                   15.0                           21.6
    Chesf               20.6                 -                          -                               20.6                      -                         -                         -                             20.6
    Furnas                18.6               8.5                     2.0                   10.9                         39.9                 141.8                      21.3                   21.3                   49.6                   49.6                          141.8
    CGT Eletrosul                   -                  8.5                       -                      10.9                         19.3                 68.0                      13.0                   13.0                   29.0                   13.0                          68.0
                         
  Generation - Acquisition Partnerships*  1Q21   2Q21   3Q21   4Q21  Total Realized Budgeted up to 06/2021 PDNG Budget 1Q21 PDNG Budget 2Q21 PDNG Budget 3Q21 PDNG Budget 4Q21 PDNG Budget 2021
    Eletrobras                        
    Eletronorte                        
    Chesf                   -                    -                          -                         -                            20.6                 20.6                         -                         -                         -                         -                             20.6
    Furnas                   -                  31.1                       -                         -                             31.1               438.7                        1.3                     1.3                     1.3                 435.0                        438.7
    CGT Eletrosul                        
                         
  Transmission  1Q21   2Q21   3Q21   4Q21  Total Realized Budgeted up to 06/2021 PDNG Budget 1Q21 PDNG Budget 2Q21 PDNG Budget 3Q21 PDNG Budget 4Q21 PDNG Budget 2021
    Eletrobras                   -                    -                          -                         -                               -                        -                            -                         -                         -                         -                                 -   
    Eletronorte                19.6               41.1                    49.1                   98.6                       208.4               369.0                      34.6                 103.7                   96.7                 134.0                        369.0
    Chesf               70.3            168.6                  211.5                 265.1                       715.4                801.7                    187.8                 290.6                 216.9                 106.4                         801.7
    Furnas               30.4              41.9                    68.1                   89.7                       230.2               727.6                      63.9                   81.2                  141.6                 440.9                        727.6
    CGT Eletrosul               22.2            108.7                   49.2                 528.6                       708.7               598.3                      54.5                 388.2                   69.7                   85.9                        598.3
                         
  Transmission - Implementation  1Q21   2Q21   3Q21   4Q21  Total Realized Budgeted up to 06/2021 PDNG Budget 1Q21 PDNG Budget 2Q21 PDNG Budget 3Q21 PDNG Budget 4Q21 PDNG Budget 2021
    Eletrobras                   -                    -                          -                         -                               -                        -                            -                         -                         -                         -                                 -   
    Eletronorte                   -                    -                          -                         -                               -               
    Chesf                    -                    -                          -                         -                               -                        -                            -                         -                         -                         -                                 -   
    Furnas                 0.4               0.2                     0.0                     0.3                           0.9                  15.0                         -                         -                         -                      15.0                           15.0
    CGT Eletrosul                   -                    -                          -                        0.0                           0.0                     -                            -                         -                         -                         -                                 -   
                         
  Transmission - Expansion   1Q21   2Q21   3Q21   4Q21  Total Realized Budgeted up to 06/2021 PDNG Budget 1Q21 PDNG Budget 2Q21 PDNG Budget 3Q21 PDNG Budget 4Q21 PDNG Budget 2021
    Eletrobras                   -                    -                          -                         -                               -                        -                            -                         -                         -                         -                                 -   
    Eletronorte                   -                    -                          -                         -                               -                        -                            -                         -                         -                         -                                 -   
    Chesf                 15.4             37.5                   33.9                   18.9                       105.7                 98.6                      66.1                    14.1                   10.7                     7.6                          98.6
    Furnas                   -                    -                          -                         -                               -                     10.0                         -                         -                         -                      10.0                           10.0
    CGT Eletrosul                   -                    -                          -                         -                               -               

 

 

169 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

                         
  Transmissão - reinforcements and improvements  1Q21   2Q21   3Q21   4Q21  Total Realized Budgeted up to 06/2021 PDNG Budget 1Q21 PDNG Budget 2Q21 PDNG Budget 3Q21 PDNG Budget 4Q21 PDNG Budget 2021
    Eletrobras                   -                    -                          -                         -                               -                        -                            -                         -                         -                         -                                 -   
    Eletronorte                 6.4             34.9                   35.5                   63.7                       140.5               238.3                      16.4                   71.9                   82.1                   67.8                        238.3
    Chesf                54.9             131.1                  177.5                 246.2                       609.7                703.1                     121.7                 276.5                 206.1                   98.8                         703.1
    Furnas                12.3              21.6                   37.9                   29.2                         101.1                 177.1                      37.8                   32.7                   55.9                   50.7                          177.1
    CGT Eletrosul               22.0             25.4                   48.7                 109.6                       205.6                261.0                      54.3                   51.9                   69.2                   85.6                         261.0
                         
  Transmission - Maintenance  1Q21   2Q21   3Q21   4Q21  Total Realized Budgeted up to 06/2021 PDNG Budget 1Q21 PDNG Budget 2Q21 PDNG Budget 3Q21 PDNG Budget 4Q21 PDNG Budget 2021
    Eletrobras                   -                    -                          -                         -                               -                        -                            -                         -                         -                         -                                 -   
    Eletronorte                13.2               6.2                    13.7                   25.1                         58.2                 83.8                      18.2                   31.8                   14.5                   19.3                          83.8
    Chesf                    -                    -                          -                         -                               -               
    Furnas                16.6              20.1                   30.2                   60.2                       127.2               230.0                      24.8                   47.3                   84.4                   73.5                        230.0
    CGT Eletrosul                 0.2               0.2                     0.6                     5.1                           6.1                    1.4                        0.3                     0.4                     0.4                     0.3                             1.4
                         
  Transmission - Financial Investments Partnerships  1Q21   2Q21   3Q21   4Q21  Total Realized Budgeted up to 06/2021 PDNG Budget 1Q21 PDNG Budget 2Q21 PDNG Budget 3Q21 PDNG Budget 4Q21 PDNG Budget 2021
    Eletrobras                   -                    -                          -                         -                               -                        -                            -                         -                         -                         -                                 -   
    Eletronorte                   -                    -                          -                        9.8                           9.8                 46.9                         -                         -                         -                      46.9                          46.9
    Chesf                   -                    -                          -                         -                               -               
    Furnas                   -                    -                          -                         -                               -               
    CGT Eletrosul                   -                    -                          -                    196.3                       196.3                     -                            -                         -                         -                         -                                 -   
                         
  Transmission - Financial Investments Acquisition  1Q21   2Q21   3Q21   4Q21  Total Realized Budgeted up to 06/2021 PDNG Budget 1Q21 PDNG Budget 2Q21 PDNG Budget 3Q21 PDNG Budget 4Q21 PDNG Budget 2021
    Eletrobras                        
    Eletronorte                        
    Chesf                        
    Furnas                  1.0                 -                          -                         -                              1.0               295.5                        1.3                     1.3                     1.3                 291.7                        295.5
    CGT Eletrosul                   -                 83.1                       -                    217.6                       300.7               336.0                         -                    336.0                      -                         -                           336.0
                         
                         
  Others¹  1Q21   2Q21   3Q21   4Q21  Total Realized Budgeted up to 06/2021 PDNG Budget 1Q21 PDNG Budget 2Q21 PDNG Budget 3Q21 PDNG Budget 4Q21 PDNG Budget 2021
    Eletrobras                  9.1               2.6                     4.8                     4.5                         21.0                  41.4                      15.4                     8.6                     8.5                     8.9                           41.4
    Eletronorte                 3.3               2.9                      1.1                 155.9                       163.2                184.8                      12.5                 155.2                     9.1                     7.9                         184.8
    Chesf               25.9             23.4                   43.8                   71.2                       164.3               208.5                      43.0                   40.4                   41.3                   83.8                        208.5
    Furnas                17.4              19.5                    21.5                   45.0                       103.4                137.9                      16.4                   29.1                   41.5                   51.0                         137.9
    Eletronuclear                 5.3                1.6                      0.1                     4.7                          11.6                  31.8                      17.0                     2.7                     4.2                     7.9                           31.8
    CGT Eletrosul                 3.9              41.4                     3.5                   15.8                         64.6                 79.3                      43.0                   19.4                   13.4                     3.5                          79.3
                         
                         
  Company 2021 Investment Budgeted up to 06/2021 PDNG Budget 1Q21 PDNG Budget 2Q21 PDNG Budget 3Q21 PDNG Budget 4Q21 PDNG Budget 2021
   1Q21   2Q21   3Q21   4Q21  Total Realized
    Eletrobras                  9.1               2.6                     4.8                     4.5                          21.1                104.3                      28.7                   58.2                     8.5                     8.9                         104.3
    Eletronorte               25.8             69.7                   70.6                 320.1                       486.3                814.3                      84.2                 291.0                 145.5                 293.6                         814.3
    Chesf              124.7           224.8                  288.1                 443.2                    1,080.8              1,290.1                    285.7                  381.1                 318.4                 304.8                       1,290.1
    Furnas              107.0           208.4                  155.8                 279.9                       751.2             1,830.3                    152.7                 215.8                 394.2              1,067.6                      1,830.3
    Eletronuclear              228.1             313.1                  445.1                 546.1                    1,532.5            3,384.6                    631.3                 587.9                 869.7              1,295.7                     3,384.6
    CGT Eletrosul               26.9             161.9                   60.0                 557.3                       806.1                821.4                     114.8                 439.4                 124.5                 142.7                         821.4
  Total            521.6           980.6               1,024.4               2,151.2                    4,677.8            8,244.9                 1,297.5              1,973.3              1,860.8               3,113.3                     8,244.9
                         
  (1) Others are: Environmental quality, infrastructure, "Luz Para Todos" (Light For All Program) and technological development.
  *Chesf - Itaparica Infrastructure action - Maintenance Generation

 

170 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

                                 
VI.2 New Investments
                                 
VI.2.1 Generation
                                 
VI.2.1.1 Integral Responsibility
Eletrobras Companies Plant Energy source Location
(State)
Investment (R$ Million) Installed Capacity (MW) Energy Assured (MW Average) Beginning of Concession Beginning of Operation Beginning of Construction End of Concession Schedule of Works Performed (%) Physical Schedule of Work Performed (%) Contract Type (Availability or Quantity) Estimated annual revenue (R $ million)
Total Investment Estimated Reference Date of Total Investment Estimated
(update to current year)
Investment Made
(R$ Million)
Eletronorte (1) HPP Curuá-Una Hydro PA 99.70 Jan-21 57.64 12.50 4.80 - May-22 Dec-20 Sep-44 91.60% Quantity 7.0 N/A
Eletronuclear (2) (3) (4) Angra 3 Nuclear RJ                    30,832.00 Dec-21                    9,789.80 1,405.00 1282,7 (5) (4) Nov-27 Nov-09 Nov-67 66.21% N/A N/A 232,6 (9)
Furnas (7) TPP Santa Cruz Gas thermal RJ 677.00 Jul-16 673,07 (6) 150.00 120.36 08.22.1963 and 03.10.1967 Nov-22 Apr-18 07/07/2015 (8) 96.49% Quantity(10) 232,6 (9)  
CGT Eletrosul CGH Cachoeira Branca Hydro MS 11,32 (11) Dec-21 4.39 1.05 0.97   Oct-22 Sep-20   54.60% Quantity 2,0  
       
(1) Expansion - 4th unit of HPP Curuá-Una. The reference for the investment made is Dec/20. The physical schedule carried out also refers to projects, fabrications, among other contractual activities.
(2) The direct cost budget approved by the Executive Board is R$ 30,832 billion according to Resolution RDE 1616.008/22 of 01/11/2022, being R$ 9,789.8 million already realized. The indirect costs added to the project are those legally permitted, such as: internal engineering, administration, capitalized financial charges, etc. Law 14.120, of March 1, 2021 - D.O.U. of 03.02.2021, established that the sale price of the energy to be generated by the Angra 3 Plant will result from the study carried out by BNDES, which must be approved by the CNPE, and must cumulatively consider the economic and financial feasibility of the enterprise and its financing under market conditions, observing the principles of reasonableness and reasonable tariffs.
(3) No operating license for Angra 3. It is considered 40 years from 11.29.2027 by analogy with Angra 2. 
(4) CNAAA's plants do not operate under the concession regime. They are operating under the authorization regime. Angra 3 has an exploration license given by Decree No. 75,870 of 6/13/1975 and nowadays by the DNAEE Ordinance nº 315 of 07/31/1997.
(5) Ordinance No. 1,118/SPE/MME, of December 30, 2021, of the Energy Planning and Decommissioning Department of the Ministry of Mines and Energy defined the physical guarantee of energy for the Angra 3 Plant at 1,282.7 average MW.
(6) Investment amounts are in national currency.
(7) The Santa Cruz Plant had 351 MW average traded in the RCE at the 5th Energia Nova Auction. However, through the New Energy MCSD (Mechanism of Compensation of Surpluses and Deficits), contracts were reduced by 30% from 2018 (245.7 MW avg) - being fully serviced by current units in commercial operation. Thus, the Assured Energy related to the combined cycle is not contracted.
(8) ANEEL was requested to extend the concession under the terms of the REQ.GCO.P.027 application, of 07/05/2013, which conditions are still in force, although the new date has not been defined yet.
(9) The reference for the expected annual revenue value is the August/2017 Business Plan.
(10) Quantity contract with seasonality following the generation profile.
(11) Amount to be approved at a Board meeting and then subject to changes in the bidding, in accordance with the service provider's proposal.
N/A: Not Available      

 

171 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 
VI.2.1.2 Special Purpose Entities
 
There are no SPE generation projects under construction.

 

 

172 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

                           
VI.2.2 Transmission
                           
VI.2.2.1 Integral Responsibility
                           
VI.2.2.1.1 Transmission Lines
Eletrobras companies Object
(From - To)
Investment Data base  Total Investment (according to data-base)(R$ Million)   Total Investment Made (R$ Million)  Lines Extension (km) Voltage (kV) Beginning of Operation End of Concession  AAR (R$ Million)   AAR Data base   Readjustment Index   Reinforcement and Improvement / Expansion   Expected investment 2021 (R$ Million)
Company 
CGT Eletrosul TL 230 kV Nova Prata 2 - Vila Maria C1 e C2 - retrofit for new capacities Jun-20                                          36.28 10 0 230 Oct-22 Dec-42                             5.08 7/2021 IPCA Reinforcement and Improvement                            18.32
TL 230 kV Monte Claro - Nova Prata 2 C1 and C2: retrofit for new capacities Jun-20                                          17.73 5 0 230 Jun-22 Dec-42                             2.52 7/2021 IPCA Reinforcement and Improvement                             8.96
TL 230 kV Passo Fundo - Vila Maria C1 ad C2 : retrofit for new capacities Jun-20                                          77.23 21 0 230 Dec-22 Dec-42                            11.00 7/2021 IPCA Reinforcement and Improvement                           38.76
TL Cascavel Oeste - Guaíra: changing the operating voltage from 230kV to 500kV. Jun-20                                          38.57 5 2.9 525 Oct-22 Dec-42                             4.75 7/2021 IPCA Reinforcement and Improvement                            17.39
Sectioning of the LT 230kV Londrina ESUL-Maringá in SS Sarandi Jun-20                                          22.14 3 1 230 Sep-22 Dec-42                             3.15 7/2021 IPCA Reinforcement and Improvement                              8.15
TL retrofit 230 kV Blumenau - Joinville Norte Dec-20                                          13.33 0 0 230 Dec-23 Dec-42                             1.98 7/2021 IPCA Reinforcement and Improvement  ND 
TL retrofit 230kV Joinville-Joinville Norte Dec-20                                            0.15 0 0 230 Dec-22 Dec-42                             0.02 7/2021 IPCA Reinforcement and Improvement  ND 
TL retrofit 230kV Blumenau - Joinville Dec-20                                            9.56 0 0 230 Jun-23 Dec-42                              1.41 7/2021 IPCA Reinforcement and Improvement  ND 
 Furnas  SS Rio dos Bois  Feb-21                                            0.08 0 0.46 138 Sep-24 Dec-42                             2.07 7/2021 IPCA Reinforcement and Improvement                                 -   
TL 138kV Angra/Angra (ENEL)  Feb-21                                          54.15 17 0.00 138 Dec-23 Dec-42                             3.57 7/2021 IPCA Reinforcement and Improvement                               4.11
SS Iriri 2R Feb-21                                            8.87 0 0.50 138 Jun-24 Dec-42                             1.67 7/2021 IPCA Reinforcement and Improvement                                 -   
Chesf  Sectioning of TL 500 kV Luiz Gonzaga - Milagres C1 in SS Milagres II Jul-20                                          36.36                                            0.48 2 500 May-23 Dec-42                             7.43 7/2021 IPCA Reinforcement and Improvement                            10.48
TL 230 kV Paraiso / Açu / Mossoró Jul-20                                         101.59                                          66.99 192 230 Oct-22 Nov-40                             6.20 7/2021 IPCA Expansion                           22.03
LT 230 kV CATU – Governador Mangabeira - retrofit to raise loading limit Jul-20                                          12.87                                          10.77 0 230 Oct-22 Dec-42                             2.02 7/2021 IPCA Reinforcement and Improvement                              1.37
Sectioning of TL 500 kV Sobradinho - Luiz Gonzaga C2 in SS Juazeiro III Jul-20                                          40.68                                            0.41 1 500 Mar-23 Dec-42                             6.24 7/2021 IPCA Reinforcement and Improvement                            12.58
Re-fixing the transmission line’s cables of TL 230 kV Recife II - Pirapama II C2 in SS Jaboatão II Jul-20                                            2.63                                            0.32 0 230 Mar-23 Dec-42                               1.11 7/2021 IPCA Reinforcement and Improvement                              0.81
Sectioning of TL 500 kV Angelim II - Recife II in SS Suape II. Jul-20                                          94.66                                          46.77 50 500 Mar-23 Dec-42                           14.82 7/2021 IPCA Reinforcement and Improvement                            33.61
TL 230kV CATU - CAMAÇARI IV - C1/C2: short-term capacity retrofit from 631A to 795A. Jul-20                                            5.00                                            4.09 0.00 230 Jun-22 Dec-42                             0.62 7/2021 IPCA Reinforcement and Improvement                             2.83
TL 230 kV PIRIPIRI / SOBRAL - short-term capacity retrofit from 595A to 630A Jul-20                                          10.44                                            6.40 0.00 230 Dec-23 Dec-42                             1.39 7/2021 IPCA Reinforcement and Improvement                              1.54
TL 230 kV Paulo Afonso III – Angelim C1 - increase in short-term capacity from 516 A to 621 A. Jul-20                                          14.35                                           12.18 0 230 Apr-24 Dec-42                             2.17 7/2021 IPCA Reinforcement and Improvement                               1.71
Eletronorte Sectioning of the TL 138kV Rondonópolis-Couto Magalhães at the Petrovina Substation Aug-21 23.46 0.00 0.6 138 Feb-24 Dec-42 3.40 7/2021 IPCA Reinforcement and Improvement 0.35
                           
(*) Investment made by Chesf after incorporation of TDG

 

173 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

                           
VI.2.2.1.2 Substations                          
Eletrobras Companies SS Investment Data base  Investment (R$ Million)   Investment Made (R$ Million)  Transformation capacity (MVA) Location (State) Beginning of Operation End of Concession  AAR (R$ Million)   AAR Data base   Readjustment Index   Reinforcement and Improvement / Expansion   Expected investment 2021 (R$ Million)
Company 
CGT Eletrosul SS Caxias: Installation of the 2nd bank of single-phase reactors 525 kV - (3 + 1) x50 Mvar Jun-20                                         32.55                                   15.03 0 RS May-22 Dec-42           5.37 7/2021 IPCA Reinforcement and Improvement                                                          21.50
  SSFoz do Chapecó - installation of the 4th 230/138 kV three-phase autotransformer - 50 MVA Jun-20                                          17.32                                    11.88 50 SC Mar-22 Jun-41           2.34 7/2021 IPCA Reinforcement and Improvement                                                           11.24
  SS Joinville - Replacement of transformers TF7(75MVA),TF3(100MVA),TF8(100MVA) by 3x150MVA and TF5(33MVA) by 66MVA Jun-20                                          35.16                                   35.16 208 SC Jan-22 Dec-42           6.84 7/2021 IPCA Reinforcement and Improvement                                                          14.46
  SE Farroupilha - Replacement of the three-phase transformer - TF2 - 230/69 kV - 88 MVA, for a new 230/69 kV transformer of 88 MVA Jun-21                                           12.10                                        -    0 RS Nov-24 Dec-42             1.81 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Assis - replacement of single-phase transformer TF1 - 440/230 kV, 336 MA Jun-21                                         36.90                                        -    0 SP Nov-24 Dec-42           5.53 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Assis - replacement of the spare single-phase transformer - TFR1, 440/230 kV, 112 MVA Jun-21                                          12.30                                        -    0 SP Nov-24 Dec-42            1.84 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Areia - replacement of the single-phase autotransformer, TF2, 525/230 kV, 672 MV Jun-21                                          52.81                                        -    0 PR Nov-24 Dec-42            7.91 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Blumenau - replacement of the TF3 three-phase transformer, 230/138 kV, 150 MVA Jun-21                                          15.27                                        -    0 SC Nov-24 Dec-42           2.29 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Blumenau - replacement of the TR4 three-phase transformer, 230/138 kV, 150 MVA Jun-21                                          15.27                                        -    0 SC Nov-24 Dec-42           2.29 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Blumenau - BC1 capacitor bank replacement, 230 kV, 125 MVAr Jun-21                                           2.89                                        -    0 SC Nov-24 Dec-42           0.48 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Blumenau - BC2 capacitor bank replacement, 230 kV, 125 MVAr Jun-21                                           2.89                                        -    0 SC Nov-24 Dec-42           0.48 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Blumenau - replacement of the TF5 single-phase autotransformer, Phases A, B and C, 672 MVA Jun-21                                         52.39                                        -    0 SC Nov-24 Dec-42           7.84 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Curitiba - replacement of single-phase reactor RE2, 525 kV, 150 MVAr, Phases A, B and C Jun-21                                           14.10                                        -    0 PR Nov-24 Dec-42            2.10 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Curitiba - replacement of the RER1 reserve single-phase reactor, 525 kV, 50 MVAr Jun-21                                           4.70                                        -    0 PR Nov-24 Dec-42           0.70 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Curitiba - replacement of the spare single-phase autotransformer 525/230 kV, 224 MVA Jun-21                                          17.46                                        -    0 PR Nov-24 Dec-42           2.62 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Curitiba - replacement of the TF2 single-phase autotransformer, 525/230 kV, 672 MVA Jun-21                                         52.39                                        -    0 PR Nov-24 Dec-42           7.85 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Gravataí - replacement of the spare single-phase autotransformer, 525/230 kV, 224 MVA Jun-21                                          17.46                                        -    0 RS Nov-24 Dec-42           2.62 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Anastácio - Implementation of the 3rd three-phase reactor, 230 kV, 27 MVAr and the respective 230 kV connection module Jun-21                                          16.99                                        -    0 MS Nov-23 Dec-42           2.59 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Siderópolis - Replacement of TF1 and TF3 230/69 kV - 88 MVA for 2 x 150 MVA Jun-21                                         29.20                                        -    124 SC Dec-23 Dec-42           4.34 7/2021 IPCA Reinforcement and Improvement                                                               -   
Eletronorte SS COXIPO - Installation of 138 kV Derivative Capacitor Bank Sep-21                                          15.57 13 0 MT Nov-21 Dec-42            3.12 7/2021 IPCA Reinforcement and Improvement                                                          14.63
  SS Tucuruí - Installation of the second transformer 230/69 kV Sep-21                                         24.60 15 100 PA Feb-22 Dec-42            3.19 7/2021 IPCA Reinforcement and Improvement                                                          22.94
  SS Lucas do Rio Verde: 2nd Bank of Autotransformers 230/138 kV - 3x25 MVA Sep-21                                         25.58 2 75 MT Jun-22 Jun-41           4.38 7/2021 IPCA Reinforcement and Improvement                                                            2.58
  SS Guamá - Replacement of power transformer TR1 230/69 kV- (3+1)x50 MVA (Improvement) Sep-21                                         30.74 0 0 PA Nov-24 Dec-42           2.59 7/2021 IPCA Reinforcement and Improvement                                                            0.25
  SS Guamá - Replacement of power transformer TR2 230/69 kV-3x50 MVA (Improvement) Sep-21                                         24.77 0 0 PA Oct-23 Dec-42           3.45 7/2021 IPCA Reinforcement and Improvement                                                            0.72
  SS Utinga - Replacement of power transformer TF1 230/69 kV-3x50 MVA (Improvement) Sep-21                                         23.20 0 0 PA Aug-23 Dec-42           2.59 7/2021 IPCA Reinforcement and Improvement                                                            0.67
  SS Utinga - Replacement of TF2 230/69 kV - 3x50 MVA power transformer (Improvement) Sep-21                                          23.21 0 0 PA Sep-24 Dec-42           2.59 7/2021 IPCA Reinforcement and Improvement                                                            0.19

 

174 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

  SS Vila do Conde-Replacement of 4 capacitor banks 230 kV, 111 MVAr each. (Improvement) Sep-21                                          43.16 0 0 PA Sep-24 Dec-42           3.69 7/2021 IPCA Reinforcement and Improvement                                                            0.35
  SS Vila do Conde-Replacement of 500 kV reactor banks, (3+1)x55 MVAr (Improvement) Sep-21                                          13.68 0 0 PA Aug-23 Dec-42           2.28 7/2021 IPCA Reinforcement and Improvement                                                            0.40
  SS Colinas - BC2 500 kV, 161 MVA Fixed Series Trim Replacement (Improvement) Sep-21                                          61.78 0 0 TO Sep-24 Dec-42           8.99 7/2021 IPCA Reinforcement and Improvement                                                            0.49
  SS Imperatriz-Replacement of the reactor RT1 500 kV, 3x50 MVAr, and RTR5 500 kV, 50 MVAr (Improvement) Sep-21                                         24.67 0 0 MA Jan-24 Dec-42           2.23 7/2021 IPCA Reinforcement and Improvement                                                            0.72
  SS Imperatriz-Replacement of BC2 500kV series compensation, 451 Mvar. (Improvement) Sep-21                                         93.30 0 0 MA Nov-24 Dec-42           11.83 7/2021 IPCA Reinforcement and Improvement                                                            0.75
  SS Imperatriz-Replacement of the reactor RT3 500 kV, 3x33.3 MVAr, and RTR4 500 kV, 33.3 MVAr (Improvement) Sep-21                                         23.89 0 0 MA Oct-23 Dec-42            2.10 7/2021 IPCA Reinforcement and Improvement                                                            0.69
  SS Marabá- Replacement of BC2 500kV,283 Mvar series compensation. (Improvement) Sep-21                                          81.02 0 0 PA May-24 Dec-42           9.70 7/2021 IPCA Reinforcement and Improvement                                                            0.65
  SS Marabá-Replacement of 500kV RT3.3x45.33Mvar reactors. (Improvement) Sep-21                                          14.06 0 0 PA Aug-23 Dec-42            1.70 7/2021 IPCA Reinforcement and Improvement                                                            0.41
  SS Marabá - Replacement of 500kV RTR2, 45.33Mvar, and RT2.3x45.33Mvar reactors. (Improvement) Sep-21                                         25.42                                     0.01 0 PA Apr-24 Dec-42           2.30 7/2021 IPCA Reinforcement and Improvement                                                            0.20
  SS Rondonópolis - Replacement of BC1 230 kV, 30 MVAr. (Improvement) Sep-21                                          12.06                                     0.12 0 MT Sep-23 Dec-42           0.33 7/2021 IPCA Reinforcement and Improvement                                                            0.35
  SS Pres. Dutra-Replacement of 500 kV RTR1, 50 Mvar, and RTR1, 33.3Mvar reactors (Improvement) Jul-21                                           8.40                                        -    0 MA May-23 Dec-42             1.12 7/2021 IPCA Reinforcement and Improvement                                                            0.24
  SS Pres. Dutra-Replacement of BC2 500 kV, 454 Mvar series compensation. (Improvement) Sep-21                                         93.48                                     0.13 0 MA May-24 Dec-42           11.81 7/2021 IPCA Reinforcement and Improvement                                                            0.75
  SS P.DUTRA-Replacement of a Bank of Reactors RT7 500 kV - 136 Mvar. (Improvement) Sep-21                                           13.51                                     0.08 0 MA Aug-23 Dec-42            1.64 7/2021 IPCA Reinforcement and Improvement                                                            0.39
  SS Miranda II - Installation of TR3 230/69 kV, 100MVA. Sep-21                                           19.14                                     0.38 100 MA Jan-24 Dec-42           7.93 7/2021 IPCA Reinforcement and Improvement                                                            0.55
  SS Vilhena - installation of a 230kV bar reactor Jul-21                                           11.46                                     0.00 0 RO Feb-24 Dec-42            1.92 7/2021 IPCA Reinforcement and Improvement                                                            0.23
  SS Vilhena - installation of a 230kV bar reactor Jul-21                                           11.46                                     0.00 0 RO Jun-24 Dec-42            1.93 7/2021 IPCA Reinforcement and Improvement                                                            0.23
  SE Marabá: Replacement TF2 230/69 kV, 33MVA, per 100 MVA unit Dec-21                                          19.76                                     0.29 67 PA Jun-24 Dec-42            4.17 7/2021 IPCA Reinforcement and Improvement                                                            0.30
Chesf SS Morro do Chapéu II - Installation of the second 230/69 kV, 150 MVA transformer and connections. Jul-21                                          17.22                                     0.92 150 BA Mar-22 Oct-41            2.71 7/2021 IPCA Reinforcement and Improvement                                                            7.60
  SS Milagres - Installation of the fouth transformer, 230/69 kV, 100 MVA and conections. Jul-21                                          18.46                                     2.56 100 CE Mar-22 Dec-42           2.90 7/2021 IPCA Reinforcement and Improvement                                                          18.87
  SS Boa Esperança (Improvements) - Replacement of single-phase reactors Jul-21                                          19.53                                     0.22 0 PI Mar-23 Dec-42           3.23 7/2021 IPCA Reinforcement and Improvement 11
  SS Icó - Installation of the third transformer, 230/69 kV, 100 MVA and conections. Jul-21                                          15.58                                     2.19 100 CE Mar-22 Dec-42           2.45 7/2021 IPCA Reinforcement and Improvement                                                          16.32
  Instalation of the 4th transformer 230/69 kV, in SS Campina Grande II Jul-21                                          15.80                                     1.56 100 PB Jul-22 Dec-42           2.44 7/2021 IPCA Reinforcement and Improvement                                                            7.09
  Instalation of the 4th autotransformer of 500/230 kV, in SS Teresina II Jul-21                                         37.44                                   38.60 300 PI Mar-23 Dec-42           5.79 7/2021 IPCA Reinforcement and Improvement                                                          28.54
  SS Eunápolis - installation of the first 230 kV - 20 Mvar three-phase shunt capacitor bank Jul-21                                           9.69                                     0.41 0 BA Mar-23 Dec-42            1.54 7/2021 IPCA Reinforcement and Improvement                                                            3.00
  Instalation of the 1st Bar Reactors Banks 500 kV - 3X50 Mvar in SS Sobral III Jul-21                                         28.77                                     8.34 0 CE Mar-22 Dec-42           4.40 7/2021 IPCA Reinforcement and Improvement                                                          29.54
  3rd bank of autotransformer 500/230-13,8 kV, 3x200 MVA and connections, in SS Messias. Jul-21                                         58.75                                     0.68 600 AL Mar-23 Dec-42           9.07 7/2021 IPCA Reinforcement and Improvement                                                          27.58
  SS São João do Piauí - Installation of the second 500/230 kV, 300 MVA autotransformer and connections. Jul-21                                           37.11                                     5.32 300 PI Apr-22 Dec-42           5.70 7/2021 IPCA Reinforcement and Improvement 31.57
  SS Fortaleza - installation of the fifth 230/69 kV transformer Jul-21                                          15.22                                    11.73 100 CE Mar-22 Dec-42           2.35 7/2021 IPCA Reinforcement and Improvement                                                            0.82
  SS Camaçari II - Longitudinal sectioning of 230 kV bars and associated adjustments Jul-21                                          24.10 19 0 BA May-22 Dec-42           3.44 7/2021 IPCA Reinforcement and Improvement                                                            0.67
  SS Recife II - Longitudinal sectioning of 230 kV bars and associated adjustments Jul-21                                         40.24 29 0 PE Jun-22 Dec-42           5.63 7/2021 IPCA Reinforcement and Improvement                                                            4.75
  SS Matatu - implementation of the fourth 230/69 kV transformer  Jul-21                                          18.97  0,26 (*)  150 CE Dec-22 Jul-40           2.39 7/2021 IPCA Reinforcement and Improvement                                                          14.56
  Installation at SS Aquiraz II of the 4th Three-Phase Transformer and the 2nd Grounding Transformer Jul-21                                         57.79                                        -    450 RN Apr-22 Oct-41          10.54 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS João Camara III - Installation of 5th Bank of Autotransformers 500/138 kV - 3 x 150 MVA and connections Jul-21                                            3.01                                     0.02 0 PI Mar-24 Dec-42           0.46 7/2021 IPCA Reinforcement and Improvement                                                            1.42
  Improvement - SS São João do Piauí - Replacement of 500kV,33.3Mvar single-phase reserve reactor Jul-21                                           8.94                                        -    0 PE May-24 Dec-42            1.34 7/2021 IPCA Reinforcement and Improvement                                                            2.19
  SS Angelim: replacement of the TR3 230/69 kV - 100 MVA three-phase transformer (improvement) Jul-21                                           8.94                                     0.01 0 BA May-24 Dec-42            1.34 7/2021 IPCA Reinforcement and Improvement                                                            2.19
  SS Governador Mangabeira: replacement of the TR1 230/69 kV - 100 MVA three-phase transformer (improvement) Jul-21                                           8.94                                     0.09 0 BA May-24 Dec-42            1.34 7/2021 IPCA Reinforcement and Improvement                                                            2.19

 

175 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

  SS Jacaracanga: replacement of the TR1 230/69 kV - 100 MVA three-phase transformer (improvement) Jul-21                                           8.94                                        -    0 BA May-24 Dec-42            1.34 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Jacaracanga: replacement of the TR2 230/69 kV - 100 MVA three-phase transformer (improvement) Jul-21                                           8.94                                     0.10 0 SE May-24 Dec-42            1.34 7/2021 IPCA Reinforcement and Improvement                                                            2.19
  SS Jardim: replacement of the TR2 230/69 kV - 100 MVA three-phase transformer (improvement) Jul-21                                           8.94                                     0.07 0 BA May-24 Dec-42            1.34 7/2021 IPCA Reinforcement and Improvement                                                            2.19
  SS Matatu: replacement of the TR3 230/69 kV - 100 MVA three-phase transformer (improvement) Jul-21                                            6.21                                        -    0 CE May-24 Dec-42           0.93 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Banabuiú: Replacement of the transformer TR1 230/69 kV - 33 MVA (improvement) Jul-21                                          17.66                                        -    0 PE Jun-24 Dec-42            2.71 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Angelim II 500 kV - installation of the 2nd bank of 500 kV bar reactors Jul-21                                          17.66                                        -    0 BA May-24 Dec-42            2.71 7/2021 IPCA Reinforcement and Improvement                                                               -   
  SS Olindina - installation of the second 500kV bar reactor bank Jul-21                                         29.79                                        -    100 BA Apr-24 May-42           3.80 7/2021 IPCA Reinforcement and Improvement                                                               -   
Furnas SS Adrianópolis - Reactor replacement, AT53, AT1B, AT2A and AT2B  Feb-21                                         57.69                                   60.31 0 RJ Aug-22 Dec-42            9.31 7/2021  IPCA  Reinforcement and Improvement                                                            1.48
  SS Serra da Mesa 9R Feb-21                                           11.44                                     9.79 0 GO Feb-23 Dec-42           3.78 7/2021  IPCA  Reinforcement and Improvement                                                            0.07
  SS Brasília Sul - AT02 Service life increase Feb-21                                           8.95                                   10.25 0 DF Jan-22 Dec-42            1.35 7/2021  IPCA  Reinforcement and Improvement                                                            1.05
  SS Itumbiara 16R Feb-21                                         25.47                                     0.21 0 MG Aug-23 Dec-42           2.87 7/2021  IPCA  Reinforcement and Improvement                                                            0.08
  SS Itumbiara 17R Feb-21                                         20.79                                     0.19 0 MG Jun-23 Dec-42            2.91 7/2021  IPCA  Reinforcement and Improvement                                                            0.08
  SS Itumbiara 18R Feb-21                                         131.68                                     0.35 0 MG Aug-24 Dec-42          15.53 7/2021  IPCA  Reinforcement and Improvement                                                            0.12
  SS Barreiro 1R Feb-21                                          12.23                                     0.21 0 MG Apr-23 Dec-42           0.74 7/2021  IPCA  Reinforcement and Improvement                                                            1.69
  SS Cachoeira Dourada 1R Feb-21                                         27.36                                     2.54 0 GO Jul-22 Dec-42           3.06 7/2021  IPCA  Reinforcement and Improvement                                                            2.91
  SS Angra 7R Feb-21                                            8.51                                     0.44 0 RJ Jul-22 Dec-42            1.26 7/2021  IPCA  Reinforcement and Improvement 2.20
  SS Campos 20R Feb-21                                         45.83                                    24.11 0 RJ Jan-23 Dec-42          10.09 7/2021  IPCA  Reinforcement and Improvement                                                          21.90
  SS Campos 3OP Feb-21                                           13.71                                   12.69 0 RJ Jul-22 Dec-42           3.48 7/2021  IPCA  Reinforcement and Improvement                                                            2.25
  SS Zona Oeste 3R Feb-21                                          41.50                                     0.56 900 RJ Aug-23 Dec-42           8.58 7/2021  IPCA  Reinforcement and Improvement                                                            0.30
  SS Itaberá 9R Dec-20                                         49.45                                        -    0 SP Jun-23 Dec-42           8.28 7/2021  IPCA  Reinforcement and Improvement                                                               -   
  SS Adrianópolis Dec-20                                          55.41                                     0.14 0 RJ Jul-24 Dec-42           7.70 7/2021  IPCA  Reinforcement and Improvement                                                               -   
  SS Poços de Caldas 19R Dec-20                                         66.88                                     0.06 40 MG Mar-24 Dec-42           9.97 7/2021  IPCA  Reinforcement and Improvement                                                               -   
  SS Mascarenhas de Moraes Dec-20                                           9.98                                     0.02 0 SP Dec-22 Dec-42             1.91 9/2021  IPCA  Reinforcement and Improvement                                                               -   
  SS Bandeirantes 14R Dec-20                                           11.18                                        -    0 GO Apr-24 Dec-42             1.31 7/2021  IPCA  Reinforcement and Improvement                                                               -   
  SS Rio Verde 18R Dec-20                                           4.49                                     0.05 0 GO Apr-24 Dec-42            1.45 7/2021  IPCA  Reinforcement and Improvement                                                               -   
  SS Campinas Feb-21                                         27.36                                        -    0 SP Dec-24 Dec-42            8.13 11/2021  IPCA  Reinforcement and Improvement                                                               -   
(1) Investment made by Chesf after incorporation of TDG
ND: Not available

 

176 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

                         
VI.2.2.2 Special Purpose Entities
                         
VI.2.2.2.1 Transmission Line
SPE Object
(From - To)
Eletrobras Companies (%) Expected Initial Investment
(R$ Million)
Reference Date of Total Investment Estimated Investment Made
(R$ Million) 
Lines Extension (km) Voltage (kV) Beginning of Operation End of concession AAR
(R$ Million)
AAR Base Data AAR Readjustment Index
Transnorte Energia S.A. Eng. Lechuga - Equador CD Eletronorte (49%) 1,002.80 Sep-11 298.71 392.0 500 - Jan-42 150.70 Jun-21 IPCA
Equador - Boa Vista CD 329.0 500 -

 

177 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

                         
VI.2.2.2.2 Subestations
SPE SS Eletrobras Companies (%) Expected Initial Investment
(R$ Million)
Reference Date of Total Investment Estimated Investment Made
(R$ Million) 
Transformation capacity (MVA) Location (State) Beginning of Operation End of concession AAR
(R$ Million)
AAR Base Data AAR Readjustment Index
Transnorte Energia S.A. (1) Eng. Lechuga Eletronorte (49%) (1) Sep-11 - - AM - Jan-42 22.34 Sep-20 IPCA
Equador - RR -
Boa Vista 800 May-15
Transmissora Sul Litorânea de Energia S.A. Santa Vitória do Palmar 2   CGT Eletrosul (51%) 21.85 Sep-20 0.00 70.0 RS May-22 Aug-42 4.02 Dec-20 IPCA
                         
(1) The investment of the substations are considered in the SPE-LT-Implantation tab.

 

178 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

VII. SPEs Data
                                                 
VII.1 Operational Data
                                                 
VII.1.1 Generation
                                                 
VII.1.1.1 Operational Assets and Generated Energy
SPE Plant Energy source Eletrobras
Companies (%)
Eletrobras
Total
Percentage (%)
Location
(State)
Installed
Capacity
(MW)
Physical
Guarantee
(MW)
Generated Energy Beginning of Operation End of Concession Partnership Energy Sold    
1Q21
(MWh)
2Q21
(MWh)
3Q21
(MWh)
4Q21
(MWh)
Buyer Type (*) 1Q21 2Q21 3Q21 4Q21
R$ million MWh R$ million MWh R$ million MWh R$ million MWh
V. de Santa Joana IX Energia Renováveis S.A. (1) Santa Joana IX Eólica Holding (49%) 49.00% PI 29.60 15.80 13,492.2 30,709.6 36,541.2 14,909.0 Aug-15 Mar-49 Contour Global Holding Ltda (51,00%) Eletrobras Companies ACR                
ACL                
Others ACR 4.5 28,512 4.6 28,829 4.7 29,147 6.0 34,886
ACL                
V. de Santa Joana X Energia Renováveis S.A. (1) Santa Joana X  Eólica Holding (49%) 49.00% PI 29.60 16.00 14,278.8 30,451.6 36,063.1 15,873.6 Jul-15 Mar-49 Contour Global Holding Ltda (51,00%) Eletrobras Companies ACR                
ACL                
Others ACR 4.6 29,376 4.7 29,702 4.7 30,029 6.1 35,328
ACL                
V. de Santa Joana XI Energia Renováveis S.A. (1) Santa Joana XI  Eólica Holding (49%) 49.00% PI 29.60 16.00 13,346.1 29,315.0 38,742.1 14,286.9 Jul-15 Mar-49 Contour Global Holding Ltda (51,00%) Eletrobras Companies ACR                
ACL                
Others ACR 4.8 30,456 4.9 30,794 4.9 31,133 6.1 35,328
ACL                
V. de Santa Joana XII Energia Renováveis S.A.  (1) Santa Joana XII  Eólica Holding (49%) 49.00% PI 28.90 16.90 17,764.0 26,710.2 33,156.6 21,634.3 Jul-15 Mar-49 Contour Global Holding Ltda (51,00%) Eletrobras Companies ACR                
ACL                
Others ACR 5.2 33,048 5.3 33,415 5.3 33,782 6.5 37,315
ACL                
V. de Santa Joana XIII Energia Renováveis S.A.  (1) Santa Joana XIII  Eólica Holding (49%) 49.00% PI 29.60 16.00 14,477.0 28,952.0 39,289.3 16,954.5 Jul-15 Mar-49 Contour Global Holding Ltda (51,00%) Eletrobras Companies ACR                
ACL                
Others ACR 4.6 28,944 4.6 29,266 4.7 29,587 6.1 35,328
ACL                
V. de Santa Joana XV Energia Renováveis S.A.  (1) Santa Joana XV  Eólica Holding (49%) 49.00% PI 28.90 16.20 16,886.4 32,813.9 34,061.0 17,884.2 Jul-15 Mar-49 Contour Global Holding Ltda (51,00%) Eletrobras Companies ACR                
ACL                
Others ACR 5.1 32,400 5.2 32,760 5.2 33,120 6.2 35,770
ACL                
V. de Santa Joana XVI Energia Renováveis S.A. (1) Santa Joana XVI  Eólica Holding (49%) 49.00% PI 28.90 17.40 15,613.6 32,500.0 40,001.8 19,293.1 Jul-15 Mar-49 Contour Global Holding Ltda (51,00%) Eletrobras Companies ACR                
ACL                
Others ACR 5.2 33,048 5.3 33,415 5.3 33,782 6.7 38,419
ACL                
V. de Santa Joana I Energia Renováveis S.A. (2) Santa Joana I  Eólica Holding (49%) 49.00% PI 28.90 15.00 17,387.3 32,780.7 42,604.8 18,545.3 Jan-16 Jun-49 Contour Global Holding Ltda (51,00%) Eletrobras Companies ACR                
ACL                
Others ACR 6.2 31,752 6.3 32,105 6.3 32,458 6.5 33,120
ACL 2.9 19,269 0.1 513 0.0 0    
V. de Santa Joana III Energia Renováveis S.A. (2) Santa Joana III  Eólica Holding (49%) 49.00% PI 29.60 13.40 12,544.9 26,275.7 36,056.0 14,605.4 Mar-16 Jun-49 Contour Global Holding Ltda (51,00%) Eletrobras Companies ACR                
ACL                
Others ACR 5.6 28,944 5.7 29,266 5.8 29,587 5.8 29,587
ACL 1.5 9,852 0.0 0 0.0 0    
V. de Santa Joana IV Energia Renováveis S.A. (2) Santa Joana IV Eólica Holding (49%) 49.00% PI 28.90 14.20 17,173.8 30,263.1 40,664.7 19,157.1 Jan-16 May-49 Contour Global Holding Ltda (51,00%) Eletrobras Companies ACR                
ACL                
Others ACR 6.0 30,672 6.0 31,013 6.1 31,354 6.1 31,354
ACL 2.3 13,316 0.0 0 0.0 0    
V. de Santa Joana V Energia Renováveis S.A. (2) Santa Joana V Eólica Holding (49%) 49.00% PI 28.90 15.70 14,698.0 31,449.0 42,030.5 18,450.4 Jan-16 Jun-49 Contour Global Holding Ltda (51,00%) Eletrobras Companies ACR                
ACL                
Others ACR 5.9 30,456 6.0 30,794 6.1 31,133 6.1 31,133
ACL 0.8 3,360 0.5 3,957 0.0 0    
V. de Santa Joana VII Energia Renováveis S.A. (2) Santa Joana VII Eólica Holding (49%) 49.00% PI 27.20 14.90 17,101.2 33,092.1 40,874.7 19,812.9 Jan-16 Jun-49 Contour Global Holding Ltda (51,00%) Eletrobras Companies ACR                
ACL                
Others ACR 6.2 31,968 6.3 32,323 6.4 32,678 6.4 32,899
ACL 2.2 14,427 0.0 0 0.0 0    
V. de Santo Augusto IV Energia Renováveis S.A. (2) Santo Augusto IV Eólica Holding (49%) 49.00% PI 28.90 15.50 16,533.6 33,636.6 41,015.2 18,491.8 Feb-16 Jun-49 Contour Global Holding Ltda (51,00%) Eletrobras Companies ACR                
ACL                
Others ACR 6.5 33,264 6.5 33,634 6.6 34,003 6.6 34,003
ACL 2.2 14,587 0.0 0 0.0 0    
Eólica Cerro Chato IV S.A. (3) (5) Cerro Chato IV Eólica CGT Eletrosul (78,00%) 78.00% RS 10.00 2.70 0.0 0.0 0.0 0.0 Mar-14 Mar-47 Brasil Energia Renovável (22,00%) Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Others ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Eólica Cerro Chato V S.A. (3) (5)  Cerro Chato V Eólica CGT Eletrosul (78,00%) 78.00% RS 12.00 3.40 0.0 0.0 0.0 0.0 May-14 Mar-47 Brasil Energia Renovável (22,00%) Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Others ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Eólica Cerro Chato VI S.A. (3) (5) Cerro Chato VI Eólica CGT Eletrosul (78,00%) 78.00% RS 24.00 10.40 0.0 0.0 0.0 0.0 Oct-14 Feb-47 Brasil Energia Renovável (22,00%) Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Others ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Eólica Cerro dos Trindade S.A. (3) (5)  Cerro dos Trindade Eólica CGT Eletrosul (78,00%) 78.00% RS 8.00 2.10 0.0 0.0 0.0 0.0 Nov-13 Mar-47 Brasil Energia Renovável (22,00%) Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Others ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Eólica Ibirapuitã S.A. (3) Ibirapuitã I Eólica CGT Eletrosul (78,00%) 78.00% RS 25.20 10.30 15,525.6 19,996.39 23,102.5 22,314.4 Aug-15 Feb-47 Brasil Energia Renovável (22,00%) Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Others ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 3.723 18,565 4.932 21,763 6.1 22,909 4.6 25,436
Rouar S.A. Artilleros  Eólica Holding (50,00%) 50.00% Uruguai (Colonia) 65.10 N/A 37,306.0 43,695.0 47,063.0 43,573.6 Apr-15 Dec-36 Administración Nacional de Usinas y Trasmisiones UTE (50,00%) UTE   14,306,919.8 37,306 14,714,208.4 43,695 17,231,647.6 47,063 16.4 43,574
Usina de Energia Eólica Caiçara I S.A. (4) Caiçara I Eólica Chesf (49,00%) 49.00% RN 27.00 15.10 27,081.5 20,064.3 33,244.1 35,094.1 Dec-15 Jun-47 Envolver Participações (51,00%) Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Others ACR 5.3 29,160 5.4 29,484 5.4 29,808 5.4 29,808
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Usina de Energia Eólica Caiçara II S.A. (4) Caiçara II Eólica Chesf (49,00%) 49.00% RN 18.00 9.60 14,850.5 12,652.5 22,590.1 21,720.5 Dec-15 Jul-47 Envolver Participações (51,00%) Eletrobras Companies ACR 0.0 0 0 0 0 0 0 0
ACL 0.0 0 0 0 0 0 0 0
Others ACR 3.6 20,088 3.7 20,311 3.7 20,534 3.7 20,534
ACL 0.087 391 0.1 138.2 0.3 424 0.1 424
Usina de Energia Eólica Junco I S.A. (4) Junco I Eólica Chesf (49,00%) 49.00% RN 24.00 13.10 23,244.5 16,841.3 28,391.5 30,722.8 Dec-15 Jul-47 Envolver Participações (51,00%) Eletrobras Companies ACR 0.0 0 0 0 0 0 0 0
ACL 0.0 0 0 0 0 0 0 0
Others ACR 4.8 26,136 4.8 26,426 4.9 26,717 4.9 26,717
ACL 0.130 576 0.2 572 0.4 578 0.1 578
Usina de Energia Eólica Junco II S.A. (4) Junco II Eólica Chesf (49,00%) 49.00% RN 24.00 13.30 23,400.2 16,852.3 28,200.1 30,641.3 Dec-15 Jul-47 Envolver Participações (51,00%) Eletrobras Companies ACR 0.0 0 0 0 0 0 0 0
ACL 0.0 0 0 0 0 0 0 0
Others ACR 4.5 24,624 4.5 24,898 4.6 25,171 4.6 25,171
ACL 0.126 552 0.1 170 0.3 521 0.1 521
Baguari Geração de Energia S.A. UHE Baguari Hidráulica Furnas (15,004%) 15.00% MG 140.00 84.70 77,758.60 41,422.3 28,599.5 91,799.7 Sep-09 Aug-41 Neoenergia (51,000%)
Cemig GT (34,00%)
Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Others ACR 20.9 85,321 6.7 27,149 20.6 29,971 22.4 85,607
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Chapecoense Geração S.A. UHE Foz de Chapecó Hidráulica Furnas (40,00%) 40.00% RS/SC 855.00 427.20 625,373.65 245,839.5 900,851.5 817,580.3 Oct-10 Nov-36 CPFL (51,000%)
CEEE(9,00%)
Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Others ACR 270.9 954,205 286.0 920,905 294.1 927,617 316.6 963,470
ACL 0.0 0     0.0 0 0.0 0
Companhia Energética Sinop S.A. UHE Sinop Hidráulica Chesf (24,50%)
Eletronorte (24,50%)
49.00% MT 401.88 242.80 457,168.8 402,387.2 170,002.9 365,162.1 Sep-19 Jan-50 EDF UTE Norte Fluminense (51,00%) Eletrobras Companies ACR 0.0 0 0.0 0   0    
ACL 2.3 12,355 2.3 24,848 2.4 12,629.8 2.6 12,629.8
Others ACR 78.3 479,579 74.6 457,124.0 76.3 467,448.7 79.4 486,256.2
ACL 0.0 0 0.0 0   0    
Empresa de Energia São Manoel S.A. UHE São Manoel Hidráulica Furnas (33,333%) 33.33% MT/PA 735.84 430.40 1,208,120.00 1,008,364.6 323,046.5 840,088.4 Dec-17 Apr-49 EDP (33,334%)
 CTG (33,334%)                                                                                                    
Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Others ACR 78.3 641,671 75.0 628,387 51.1 418,475 79.5 659,044
ACL 28.4 198,072 24.8 170,748 23.2 154,008 29.8 196,970
Energetica Águas da Pedra S.A. UHE Dardanelos Hidráulica Chesf (24,50%)
Eletronorte (24,50%)
49.00% MT 261.00 154.90 471,440.5 427,046.6 44,395.0 203,321.6 Aug-11 Jan-43 Neoenergia (51,00%) Eletrobras Companies ACR 0.00 0            
ACL 0.00 0            
Others ACR 77.47 332,608 73.3 309,093 76.3 310,898 83.5 335,122
ACL 0.00 0            
Energia Sustentável do Brasil S.A. UHE Jirau Hidráulica Chesf (20,00%)
CGT Eletrosul (20,00%)
40.00% RO 3,750.00 2,211.55 6,202,295.1 5,812,703.4 1,436,454.8 2,479,108.6 Sep-13 Aug-43 Mizah Energia (20,0%)
Engie (40,0%)
Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 108.5 469 95.2 411 116.2 502 116.1 502
Others ACR 326.1 2,315 488.8 3,440 481.0 3,316 514.3 3,467
ACL 168.7 738 152.6 671 176.4 763 168.1 739
Enerpeixe S.A. UHE Peixe Angical Hidráulica Furnas (40,00%) 40.00% TO 498.75 280.50 552,520.00 321,674.8 465,326.5 620,852.2 Jun-06 Nov-36 EDP (60,00%) Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Others ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 85.2 520,818 72.2 449,863 90.4 447,442 184.6 747,781
Madeira Energia S.A. UHE Santo Antônio Hidráulica Furnas (43,056%) 43.06% RO 3,568.30 2,424.20 5,630,571.00 3,798,276.0 2,933,382.7 3,714,014.3 Mar-12 Jun-43 Caixa FIP Amazônia Energia (19,63%)
Odebrecht Energia do Brasil (18,25%)
SAAG Investimentos (10,53%)
Cemig GT (8,53%)
Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Others ACR 590.9 3,920,163 563.8 3,560,532 582.8 3,569,075 633.0 3,803,800
ACL 441.2 2,045,489 380.7 1,679,758 542.2 2,258,613 452.5 1,928,371
Norte Energia S.A. UHE B. Monte  Hidráulica Chesf (15,00%)
Eletronorte (19,98%)
Eletrobras (15,00%)
49.98% PA 11,233.10 4,571.00 11,028,012 12,865,026 1,234,389 5,582,986 abr/16 Aug-45 Petros  (10,00%)
Belo Monte Part (10,00%)
Funcef (10,00%)
Outros (20,02%)
Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0    
ACL 0.0 0 0.0 0 0.0 0    
Others ACR 978.0 7,232,447 933.8 6,767,243 959.9 6,773,045 1,049.1 7,256,636
ACL 339.1 1,963,012 333.8 1,822,202 372.0 2,000,432 407.8 1,998,311
Retiro Baixo Energética S.A. UHE Retiro Baixo Hidráulica Furnas (49,00%) 49.00% MG 82.00 36.60 94,332.26 40,677.3 8,876.4 85,666.9 Mar-10 Aug-41 Orteng (25,5%)
Logos Engenharia (15,5%)
Arcadis (10%)
Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Others ACR 20.5 84,024 19.0 76,256 19.4 75,578 20.7 79,502
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Serra do Facão Energia S.A. (4) UHE Serra do Facão Hidráulica Furnas (54,013%) 54.01% GO 212.58 178.80 103,845.02 108,103.3 163,406.4 110,414.4 Jul-10 Nov-36 Alcoa (34,97%)
DME Energética (5,47%)
 Camargo Corrêa Energia (10,09%)
Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 0.0 0 0.0 0 0.0 0 0.0 0
Others ACR 73.1 280,145 67.7 255,002 70.1 256,159 75.2 268,653
ACL 33.5 123,604 33.7 124,344 41.2 152,352 33.9 125,300
Teles Pires Participações S.A. UHE Teles Pires Hidráulica Furnas (24,4975%)
CGT Eletrosul (24,50%)
49.00% PA/MT 1,819.80 939.40 2,965,862.54 2,315,306.5 649,283.0 2,224,457.0 Nov-15 Jun-46 Neoenergia (51,000%) Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
ACL 51.8 324,554 54.2 328,160 54.7 331,766 54.7 219,975
Others ACR 130.9 1,299,644 125.5 1,217,029 128.1 1,221,359 137.1 867,277
ACL 53.9 337,801 67.6 386,098 60.0 350,515 62.8 244,794
Tijoá Participações e Investimentos S.A. (7) UHE Três Irmãos Hidráulica Furnas (49,90%) 49.90% SP 807.50 217.50 280,951.40 214,985.5 352,666.2 237,326.1 Nov-93 Sep-44 Fundo de Investimento em
Participações Constantinopla (50,1%)
Eletrobras Companies ACR N/A N/A N/A N/A N/A N/A N/A N/A
ACL N/A N/A N/A N/A N/A N/A N/A N/A
Others ACR N/A N/A N/A N/A N/A N/A N/A N/A
ACL N/A N/A N/A N/A N/A N/A N/A N/A
Energia dos Ventos V S.A. (8) (9) São Januário Eólica Furnas (100%) 100.00% CE 21.00 9.70 2,165.59 11,874.02 22,528.6 27,398.9 Jun-20 Jul-47 - Eletrobras Companies ACR 0.0 0 0.0 0 0.0 0 0.0 0
Energia dos Ventos VI S.A.  (8) (9) Nossa Senhora de Fátima Eólica Furnas (100%) 100.00% CE 30.00 13.60 25,033.88 17,089.95 33,714.2 34,825.0 Jun-20 Aug-47   ACL 0.0 0 0.0 0 0.0 0 0.0 0
Energia dos Ventos VII S.A.  (8) (9) Jandaia Eólica Furnas (100%) 100.00% CE 27.00 14.10 3,098.04 19,421.68 35,719.1 38,244.7 May-20 Aug-47   Others ACR 13.4 103,032 18.7 104,177 19.0 105,322 19.0 105,322
Energia dos Ventos VIII S.A.  (8) (9) São Clemente Eólica Furnas (100%) 100.00% CE 21.00 10.20 7,449.09 13,393.60 25,982.7 27,082.6 May-20 Jul-47   ACL 0.0 0 0.0 0 0.0 0 0.0 0
Energia dos Ventos IX S.A.  (8) (9) Jandaia I Eólica Furnas (100%) 100.00% CE 24.00 10.60 21,925.58 13,971.67 27,636.0 29,677.0 May-20 Jul-47  
                                                 
                                                 
* ACR (Regulated Market) and ACL (Free Market)
(1) Chapada do Piauí I Holding S.A.
(2) Chapada do Piauí II Holding S.A.
(3) Livramento Holding S.A.
(4) Vamcruz I Participações S.A.
(5) The suspension of the operation of the wind farms is due to na accident that occurred in 12/2014.
(6) Furnas' shareholding in SEFAC increased to 54.013%, due to the purchase of part of Camargo Corrêa's shares on 05/17/2021.
(7) Tijoá operates the HPP Três Irmãos  under the Special Administration Regime (Law no. 12,783 / 2013).
(8) Fortim Wind Complex.
(9) Brasil Ventos Energia (BVE), in which Furnas holds a 100% interest, holds the following equity interest in the Complexes' enterprises: 100% Fortim, 90% Acaraú (Angelim); 49% Famosa and Baleia and 98% Itaguaçu from Bahia. Only the Fortim Wind Complex was built. 

 

179 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

                 
VII.1.2 Transmission
                 
VII.1.2.1 Operational Assets
VII.1.2.1.1 Transmission Lines
SPE Objecto
(From-To)
Eletrobras Companies (%) Extension (km) Voltage
(kV)
Beginning of Operation End of Concession AAR on 12.31.2021
(R$ Million)
Readjustment Index
Belo Monte Transmissora de Energia SPE S.A. (1) Xingu - Estreito C1 and C2 (Bipole 1) Eletronorte (24,5%)
Furnas (24,5%)
4,264.8 800 Dec-17 Jun-44 325.0 IPCA
Goiás Transmissão S.A. Rio Verde Norte – Trindade C1 and C2 Furnas (49%) 373.9 500 Dec-13 Jul-40 46.1 IPCA
Trindade – Xavantes C1 and C2 74.1 230 Dec-13
Trindade – Carajás 30.5 230 Oct-13
Interligação Elétrica do Madeira S.A. (1) Coletora Porto Velho - Araraquara 2 C1 and C2 (Bipolo 1) Chesf (24,5%)
Furnas (24,5%)
4,859.0 600 Nov-13 Feb-39 321.0 IPCA
Interligação Elétrica Garanhuns S.A. L.Gonzaga - Garanhuns II Chesf (49%) 218.0 500 Nov-15 Dec-41 75.1 IPCA
Garanhuns II - Campina Grande III 194.0 500 Nov-15
Garanhuns II - Pau Ferro 209.0 500 Dec-15
Garanhuns II - Angelim I 12.0 230 Mar-16
Lago Azul Transmissora S.A. Barro Alto - Itapaci Furnas (49,9%) 69.3 230 Sep-16 May-44 4.7 IPCA
MGE Transmissão S.A. Mesquita - Mutum Furnas (49%) 136.2 500 Aug-14 Jul-40 33.5 IPCA
Mutum - Viana 2 118.6 500
Viana 2 – Viana CD 15.0 345
Mata de Santa Genebra Transmissora S.A. Itatiba – Bateias Furnas (49,9%) 414.3 500 Mar-20 May-44 192.1 IPCA
Araraquara II - Itatiba 222.6 500 Mar-20 IPCA
Araraquara II - Fernaão Dias       249.6 500 mai/20 IPCA
Paranaíba Transmissora de Energia S.A. Luziânia - Pirapora II Furnas (24,5%) 346.2 500 May-16 May-43 137.9 IPCA
Rio das Éguas - Luziânia 368.0 500 Jul-16
Barreiras II - Rio das Éguas 239.1 500 Jan-17
Sistema de Transmissão do Nordeste S.A. Teresina II -Sobral III Chesf (49,0%) 546.0 500 Jan-06 Feb-34 137.9 IGP-m
Teresina II -Fortaleza II Jan-06
Sobral III - Fortaleza II  Jan-06
Transenergia Goiás S.A. Serra da Mesa – Niquelândia Furnas (99%) 99.7 230 Sep-17 Nov-39 14.3 IPCA
Niquelândia - Barro Alto 87.3 230 May-16
Transenergia Renovável S.A. Barra dos Coqueiros – Quirinópolis Furnas (49%) 51.3 230 Apr-11 May-40 39.9 IPCA
Palmeiras – Edéia 58.6 230 May-13
Quirinópolis - TPP Quirinópolis  33.9 138 May-11
Quirinópolis - TPP Boavista  16.4 138 May-11
Chapadão – Jataí C1 and C2 276.1 230 Dec-12
Jataí – Mineiros 61.4 138 Dec-12
Jataí - TPP Jataí 51.6 138 Dec-12
Jataí - TPP Água Emendada 32.6 138 Dec-12
Mineiros - Morro Vermelho 46.9 138 Dec-12
Morro Vermelho - TPP Alto Taquari C1 30.1 138 Dec-12
Edéia - TPP Tropical Bionenergia I e II 48.9 138  mai/13
Transenergia São Paulo S.A. EL 138 kV Itatiba  Dist 1 to 8 Furnas (49%) 0.0 138 Aug-12 Nov-39 2.8 IPCA
Transmissora Sul Litorânea de Energia S.A. Povo Novo – Marmeleiro CGT Eletrosul (51%) 152.0 525 Dec-14 Aug-42 82.2 IPCA
Nova santa Rita – Povo Novo 267.0 525 Apr-15
Marmeleiro – Santa Vitória do Palmar 48.0 525 Dec-14
Triângulo Mineiro Transmissora S.A. Marimbondo II - Assis Furnas (49%) 298.4 500 Dec-16 Aug-43 36.7 IPCA
Vale do São Bartolomeu Transmissora de Energia S.A. Samambaia - Brasília Sul Furnas (39%) 14.0 345 May-16 Oct-43 28.5 IPCA
Brasília Sul - Brasília Geral 13.6 230 May-17
Luziânia - Brasília Leste C1 68.9 500 Feb-18
Luziânia - Brasília Leste C2 67.0 500 Feb-18
Baguari Energia S.A. (2) HPP Baguari - Baguari C1 and C2  Furnas (15%) 1.2 230 Feb-10 Aug-41 N/A N/A
HPP Baguari - Baguari C3 e C4 1.4 230 Feb-10 Aug-41 N/A N/A
Enerpeixe S.A. (2) Peixe Angical – Peixe 2 Furnas (40%) 20.0 500 Apr-06 Nov-36 N/A N/A
Retiro Baixo Energética S.A. (2) HPP Retiro Baixo – Curvelo Furnas (49%) 45.1 138 Oct-10 Aug-41 N/A N/A
Serra do Facão Energia S.A. (2) HPP Serra do Facão – Celg de Catalão C1 and C2 Furnas (49,47%) 65.6 138 Oct-10 Nov-36 N/A N/A
Madeira Energia AS (2) HPP Santo Antônio - Coletora Porto Velho C1 Furnas (43,06%) 12.9 500 Apr-06 Nov-36 N/A N/A
HPP Santo Antônio - Coletora Porto Velho C2 13.6 500 Apr-06 Nov-36 N/A N/A
HPP Santo Antônio - Coletora Porto Velho C3 e C4 29.2 500 Apr-06 Nov-36 N/A N/A
HPP Santo Antônio - Porto Velho 39.6 500 Apr-06 Nov-36 N/A N/A
Empresa de Energia São Manoel S.A. (2) SS  São Manoel - SE Paranaíta Furnas (33,33%) 40.0 500 Dec-17 Apr-49 N/A N/A
Teles Pires Participações S.A. (2) HPP Teles Pires-Paranaíta C1 and C2 Furnas (24,5%) 18.6 500 Jun-11 Jun-46 N/A N/A
Chapecoense Geração S.A. (2) HPP Foz do Chapecó - Foz do Chapecó C1 and C2 Furnas (40%) 2.9 230 Oct-10 - N/A N/A
HPP Foz do Chapecó - Foz do Chapecó C3 e C4 2.9 230 Oct-10 - N/A N/A
Brasil Ventos Energia - Fortim (2) Jandaia - Russas II Furnas (100%) 68.8 230 Mar-20 Jul-47 N/A N/A
                 
(1) For direct current projects, the accounting assumption for the extension of the network was changed in order to align with the assumptions adopted by the Ministry of Mines and Energy - MME. The calculation of the network kilometer considers the extension by pole and not by section as reported in previous quarters.
(2) There is no AAR because the enterprises are of limited interest to the generating plant.

 

180 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

               
VII.1.2.1.2 Subestations         REH 2,565/2019  
SPE Substation Eletrobras Companies (%) Transformation Capacity - MVA Beginning of Operation End of Concession AAR on 12.31.2021
(R$ Million)
Readjustment Index
Belo Monte Transmissora de Energia S.A. Converter Station 4.000 MW in SS Xingu (2) Eletronorte (24,5%) 4,752.0 Dec-17 Jun-44 355.3 IPCA
Converter Station 3.850 MW in SS Estreito (2) Furnas (24,5%) 4,660.8 Dec-17 Jun-44
Caldas Novas Transmissão S.A. Corumbá (Expansion) Furnas (49,9%) 150.0 Jul-13 Jun-41 5.9 IPCA
Goiás Transmissão S.A. Trindade Furnas (49%) 1,600.0 Nov-13 Jul-40 27.5 IPCA
Interligação Elétrica do Madeira S.A. Coletora Porto Velho (Conv. 2) (2) Chesf (24,5%) 3,832.0 May-14 Feb-39 276.0 IPCA
Araraquara II (Conv. 2) (2) Furnas (24,5%) 3,608.0 May-14 Feb-39
Interligação Elétrica Garanhuns S.A. Garanhuns II Chesf (49%) 600.0 Nov-15 Dec-41 28.6 IPCA
Pau Ferro 1,500.0 Dec-15  
Luziânia Niquelândia Transmissora S.A. Luziânia Holding (49%) 450.0 Jun-14 May-42 18.0 IPCA
Niquelândia 30.0 Aug-15
Mata de Santa Genebra Transmissora S.A. Santa Barbara (C.Static)  (2) Furnas (49,9%) - Apr-19 Apr-44 76.7 IPCA
Fernão Dias  3,600.0 Jun-20 IPCA
Itatiba (C.Static) (2) - Feb-20 IPCA
MGE Transmissão S.A. Viana 2 (Expansion) Furnas (49%) 900.0 Jan-21 Jul-40 21.9 IPCA
Viana 2 900.0 Aug-14 Jul-40 IPCA
Paranaíba Transmissora de Energia S.A. Pirapora 2 (2) Furnas (24,5%) - Jan-17 May-43 18.3 IPCA
Luziânia (2) - Apr-17 May-43
Rio das Éguas (2) - Apr-17 May-43
Barreiras II (2) - May-17 May-43
Sistema de Transmissão do Nordeste S.A. Sobral III Chesf (49,0%) - Jan-06 Feb-34 12.00 IGP-m
Fortaleza II - Jan-06
Teresina II - Jan-06
Transenergia Renovável S.A. Edéia Furnas (49%) 300.0 Feb-12 Apr-39 29.9 IPCA
Jataí 450.0 Dec-12
Mineiros - Dec-12
Morro Vermelho - Dec-12
Quirinópolis 225.0 Apr-11
Transenergia São Paulo S.A. Itatiba Furnas (49%) 1,200.0 Aug-12 Nov-39 21.8 IPCA
Transmissora Sul Litorânea de Energia S.A. Povo Novo (Expansion) CGT Eletrosul (51%) 672.0 Jan-18 Aug-42 49.4 IPCA
Povo Novo 672.0 Dec-14
Santa Vitória do Palmar 75.0 Dec-14
Marmeleiro (C. Síncrono) - Oct-15
Nova Santa Rita (Expansion) - Apr-15
Transnorte Energia S.A. Boa Vista (C.Estático) Eletronorte (49%) - May-15 Jan-42 7.3 IPCA
Triângulo Mineiro Transmissora S.A. Marimbondo II  (2) Furnas (49%) - Dec-16 Aug-43 8.9 IPCA
Assis (2) - Dec-16 Aug-43
Vale do São Bartolomeu Transmissora de Energia S.A. Brasília Leste Furnas (39%) 1,080.0 Feb-18 Oct-43 13.8 IPCA
Baguari Energia S.A. (1) HPP Baguari (2) Furnas (15,004%) - Aug-06 Aug-41 N/A N/A
Enerpeixe S.A. (1) HPP Peixe Angical Furnas (40%) 525.0 Nov-01 Nov-36 N/A N/A
Teles Pires Participações S.A. (1) HPP Teles Pires Furnas (24,4975%) 2,025.0 Jun-11 Jun-46 N/A N/A
Retiro Baixo Energética S.A. (1) HPP Retiro Baixo Furnas (49%) 100.0 Aug-06 Aug-41 N/A N/A
Serra do Facão Energia S.A. (1) HPP Serra do Facão Furnas (49,4737%) 237.0 Nov-01 Nov-36 N/A N/A
Empresa de Energia São Manoel S.A. (1) Usina São Manoel Furnas (33,333%) 780.0 Dec-17 Apr-49 N/A N/A
Paranaíta (2) - Dec-17 Apr-49 N/A N/A
Madeira Energia S.A. (1) HPP Santo Antônio Furnas (43,056%) 4,130.0 Aug-07 Jun-43 N/A N/A
Brasil Ventos Energia - Fortim  (1) Jandaia Furnas (100%) 140.0 Mar-20 Jul-47 N/A N/A
(1) There is no AAR because equipments are of  the generating plant restricted interest.
(2) The substation does not belong to the SPE. 
               
(*) NOTE: It is important to mention that this value does not consider the PA of the cycle, according to Annex VI of REH 2959/2021
Note: Applied the new protocol for accounting the number of Substations and Transformation Capacity.

 

181 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

 

                                     
VII.2 Loans and Financings – R$ million
SPE Eletrobras Companies (%) BNDES (a)   Other Creditors (b)   Total
(a+b) 
2021 2022 2023 2024 2025 2026 2027 After 2027 2021 2022 2023 2024 2025 2026 2027 After 2027
Belo Monte Transmissora de Energia S.A. Eletronorte (24,5%)
Furnas (24,5%)
215.5 360.4 361.5 361.8 361.6 361.6 361.7 1,687.1 198.7 85.0 98.6 108.9 128.6 173.6 159.6 472.7 5,281.2
Goiás Transmissão S.A. Furnas (49%)   0.0 0.0 0.0 0.0 0.0 0.0 0.0 14.4 43.2 45.6 48.3 50.4 52.2 54.1 224.7 532.9
Interligação Elétrica do Madeira S.A. Chesf (24,5%)
Furnas (24,5%)
203.0 210.9 177.1 168.1 159.0 150.0 140.9 236.0 135.6 142.1 142.0 146.8 216.9 38.5 38.5 176.2 2,278.5
Interligação Elétrica Garanhuns S.A. Chesf (49%)   33.3 28.1 18.6 18.6 18.6 18.6 18.6                 154.2
Lago Azul Transmissora S.A. Furnas (49,9%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
MGE Transmissão S.A. Furnas (49%) 17.4 26.0 16.5 15.7 14.9 14.1 4.9 30.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 123.0
Paranaíba Transmissora de Energia S.A. Furnas (24,5%) 73.3 73.5 71.8 71.4 71.4 71.4 71.4 202.3 15.6 16.9 22.6 28.0 27.3 24.8 22.3 17.4 808.1
Transenergia Goiás S.A. Furnas (99%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Transenergia Renovável S.A. Furnas (49%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 24.2 25.0 26.3 19.6 11.0 12.3 52.8 171.2
Transenergia São Paulo S.A. Furnas (49%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.3 16.0 16.8 17.5 18.5 19.1 80.1 183.3
Transmissora Sul Litorânea de Energia S.A. CGT Eletrosul (51%)   37.1 38.0 38.0 38.0 38.0 38.0 123.4                 350.5
Triângulo Mineiro Transmissora S.A. Furnas (49%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 26.7 26.7 3.9 2.9 0.0 0.0 0.0 60.1
Vale do São Bartolomeu Transmissora de Energia S.A. Furnas (39%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 25.6 25.6 0.0 0.0 0.0 0.0 0.0 51.3
Caldas Novas Transmissão S.A. Furnas (49,9%) 1.8 1.9 1.5 1.2 1.1 1.1 1.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.0
Luziânia Niquelândia Transmissora S.A. Holding (49%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3.4 1.4 1.4 1.4 1.4 1.4 8.7 19.4
Mata de Santa Genebra Transmissora S.A. Furnas (49,9%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 29.1 150.4 171.4 181.9 192.4 202.3 188.0 3,739.9 4,855.5
Chapada do Piauí I Holding S.A.  Holding (49%) 15.2 15.3 16.5 17.8 19.3 20.8 22.5 120.7 0.2 0.1 1.5 2.2 3.4 3.5 4.8 8.0 271.6
Chapada do Piauí II Holding S.A.  Holding (49%) 18.8 18.8 18.8 18.8 18.8 18.8 18.8 84.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 215.8
Eólica Ibirapuitã S.A.  CGT Eletrosul (78,00%)   3.8 3.7 3.7 3.7 3.7 3.7 9.3                 31.7
Usina de Energia Eólica Caiçara I S.A.  Chesf (49,00%) 1.5 5.9 5.9 5.9 5.9 5.9 5.9 27.0                 63.8
Usina de Energia Eólica Caiçara II S.A.  Chesf (49,00%) 0.8 3.3 3.3 3.3 3.3 3.3 3.3 15.1                 35.5
Usina de Energia Eólica Junco I S.A.  Chesf (49,00%) 1.2 4.8 4.8 4.8 4.8 4.8 4.8 22.1                 52.3
Usina de Energia Eólica Junco II S.A.  Chesf (49,00%) 1.2 4.8 4.8 4.8 4.8 4.8 4.8 21.9                 51.8
Rouar S.A. (2) Holding (50,00%)   26.3 26.5 26.7 26.8 27.0 27.6 134.2                 295.1
Baguari Geração de Energia S.A.  Furnas (15,004%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Chapecoense Geração S.A.  Furnas (40,00%) 185.9 191.1 180.6 170.2 159.4 148.9 104.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 955.0
Companhia Energética Sinop S.A.   Chesf (24,50%)
Eletronorte (24,50%) 
9.2 19.5 21.1 22.8 24.7 26.7 28.9 424.4 10.8 11.5 11.5 11.3 10.9 10.0 8.9 21.9 674.2
Empresa de Energia São Manoel S.A. Furnas (33,333%) 0.0 175.3 175.3 175.3 175.3 168.0 168.0 1,848.5 234.0 59.4 35.5 41.8 47.1 52.6 56.2 256.4 3,668.6
Energetica Águas da Pedra S.A. Chesf (24,50%)
Eletronorte (24,50%)
0.0 34.7 34.7 34.7 34.7 34.7 2.8                   176.3
Energia Sustentável do Brasil S.A. Chesf (20,00%)
CGT Eletrosul (20,00%)
  303.7 294.3 318.5 329.5 357.4 387.6 3,085.4   298.2 286.1 310.7 338.3 367.8 399.9 3,171.0 10,248.2
Enerpeixe S.A. Furnas (40,00%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 301.4 161.9 298.7 22.2 154.2 143.1 0.0 0.0 1,081.5
Madeira Energia S.A. Furnas (43,056%) 1,011.5 592.6 1,384.2 3,033.8 1,261.6 1,767.4 1,603.8 14,832.1 635.3 705.6 757.4 985.5 1,317.6 865.1 738.4 6,067.3 36,547.6
Norte Energia S.A. Chesf (15,00%)
Eletronorte (19,98%)
Eletrobras (15,00%)
  761.2 1,360.1 1,360.1 1,360.1 1,360.1 1,360.1 6,251.4   30.4 33.3 37.2 36.5 33.4 29.3 205.0 14,218.2
Retiro Baixo Energética S.A. Furnas (49,00%) 17.3 17.5 16.4 15.3 14.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 63.4
Serra do Facão Energia S.A. Furnas (54,013%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Teles Pires Participações S.A. Furnas (24,4975%)
CGT Eletrosul (24,50%)
  91.0 176.6 170.0 162.4 155.6 148.6 1,075.3   178.1 257.1 247.4 236.2 225.8 215.6 1,328.2 4,668.0
Energia dos Ventos V S.A.  Furnas (100%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 7.1 8.6 8.6 8.7 8.8 8.9 82.3 133.8
Energia dos Ventos VI S.A.  Furnas (100%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.8 11.9 12.1 12.3 12.4 12.6 12.7 114.6 191.4
Energia dos Ventos VII S.A.  Furnas (100%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.3 10.4 11.4 11.5 11.5 11.6 11.7 101.1 171.5
Energia dos Ventos VIII S.A.  Furnas (100%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 7.3 8.6 8.7 8.8 8.9 9.0 81.5 133.8
Energia dos Ventos IX S.A.  Furnas (100%) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 7.9 9.4 9.5 9.7 9.8 9.9 90.2 147.2
                                     
                                     
Note:                                    
(1) Considered Exchange rate on 03/31/20 of R$ 5.6873 / US$.

 

182 

DFR - Investor Relations Superintendence

Marketletter - Annex III - 4Q21

Operating Information of Subsidiaries 

 

 

                     
  V.III Loans and Financings – R$ Million
                     
  Eletrobras Holding
  Holding 2022 2023 2024 2025 2026 2027 2028 After 2028 Total (MN + ME)
  Creditor 4,803.51 2,300.10 4,441.89 3,216.31 2,475.18 297.91 288.88 6,188.85 24,012.62
  Others 4,803.51 2,300.10 4,441.89 3,216.31 2,475.18 297.91 288.88 6,188.85 24,012.62
  CGT Eletrosul 2022 2023 2024 2025 2026 2027 2028 After 2028 Total (MN + ME)
  Por Creditor 330.31 396.02 584.43 372.75 480.29 398.24 321.23 593.64 3,476.90
  Eletrobras 64.39 173.59 175.40 177.30 179.28 73.22 66.34 362.63 1,272.16
  Others 265.92 222.43 409.03 195.44 301.02 325.01 254.89 231.01 2,204.74
  Chesf 2022 2023 2024 2025 2026 2027 2028 After 2028 Total (MN + ME)
  Por Creditor 192.11 170.75 125.86 103.61 109.64 114.65 114.34 258.70 1,189.65
  Others 192.11 170.75 125.86 103.61 109.64 114.65 114.34 258.70 1,189.65
  Eletronorte 2022 2023 2024 2025 2026 2027 2028 After 2028 Total (MN + ME)
  Por Creditor 1,456.77 1,444.27 1,125.27 418.63 167.49 117.78 68.53 129.35 4,928.08
  Eletrobras 636.76 562.44 373.75 278.50 109.26 54.63 0.00 0.00 2,015.34
  Others 820.00 881.84 751.52 140.13 58.22 63.15 68.53 129.35 2,912.75
  Eletronuclear 2022 2023 2024 2025 2026 2027 2028 After 2028 Total (MN + ME)
  Por Creditor 366.24 358.23 376.83 395.54 410.69 409.69 431.94 4,575.57 7,324.73
  Furnas 38.53 38.53 38.53 38.53 38.53 38.53 38.53 32.11 301.83
  Others 327.71 319.69 338.30 357.01 372.16 371.16 393.40 4,543.46 7,022.90
  Furnas 2022 2023 2024 2025 2026 2027 2028 After 2028 Total (MN + ME)
  Por Creditor 1,589.16 1,187.65 848.01 763.09 946.85 628.60 563.76 874.41 7,401.53
  Eletrobras 194.90 194.90 194.90 194.90 194.90 194.90 194.90 194.90 1,559.22
  Others 1,394.26 992.75 653.10 568.19 751.94 433.70 368.85 679.51 5,842.31
                     
  MN = national currency
  ME = foreign currency

 

 

183 

 

SIGNATURE

 

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

Date: April 8, 2022

CENTRAIS ELÉTRICAS BRASILEIRAS S.A. - ELETROBRÁS
     
By:

/S/ Elvira Baracuhy Cavalcanti Presta


 
 

Elvira Baracuhy Cavalcanti Presta

CFO and Investor Relations Officer

 

 

 

FORWARD-LOOKING STATEMENTS

 

This press release may contain forward-looking statements. These statements are statements that are not historical facts, and are based on management's current view and estimates offuture economic circumstances, industry conditions, company performance and financial results. The words "anticipates", "believes", "estimates", "expects", "plans" and similar expressions, as they relate to the company, are intended to identify forward-looking statements. Statements regarding the declaration or payment of dividends, the implementation of principal operating and financing strategies and capital expenditure plans, the direction of future operations and the factors or trends affecting financial condition, liquidity or results of operations are examples of forward-looking statements. Such statements reflect the current views of management and are subject to a number of risks and uncertainties. There is no guarantee that the expected events, trends or results will actually occur. The statements are based on many assumptions and factors, including general economic and market conditions, industry conditions, and operating factors. Any changes in such assumptions or factors could cause actual results to differ materially from current expectations.