SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 


 

FORM 6-K

 

Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16 of the

Securities Exchange Act of 1934

 

For the month of May, 2023

 

Commission File Number 1-34129

 


 

CENTRAIS ELÉTRICAS BRASILEIRAS S.A. - ELETROBRÁS

(Exact name of registrant as specified in its charter)




BRAZILIAN ELECTRIC POWER COMPANY

(Translation of Registrant's name into English)




Rua da Quitanda, 196 – 24th floor,
Centro, CEP 20091-005,
Rio de Janeiro, RJ, Brazil

(Address of principal executive office)



Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F. 

Form 20-F ___X___ Form 40-F _______

Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.

Yes _______ No___X____

 
 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

I. Market Data of Eletrobras Companies
                         
I.1 Installed Capacity and Physical Guarantee – MW
Company Comprehensive Responsibility (a) Comprehensive Liability under Law 13.182/15 (b) Comprehensive Liability under O&M (c) Regime SPE (d) SPE under O&M (e) Regime Net Aggregation 1Q23 Total (a+b+c+d+e)
  Installed Capacity Physical Warranty Installed Capacity Physical Warranty Installed Capacity Physical Warranty Installed Capacity Physical Warranty Installed Capacity Physical Warranty Installed Capacity Physical Warranty Installed Capacity Physical Warranty
Eletrobras Holding                                -                                  -                             -                            -                                   -                              -                                  185                     99                          -                             -                         -                            -                        185                        99
Eletronorte                           9,815                         4,897                          -                            -                                   78                           62                            4,092                 1,696                          -                             -                         -    -                      35                13,984                   6,656
Chesf                            1,015                          1,006                     1,050                      458                           8,395                      3,331                            2,643                 1,226                          -                             -                         -    -                  1,030                 13,103                    6,021
Furnas                           2,152                          1,303                     2,082                      949                           4,645                      2,351                            4,414                2,703                       403                        103                   450                      255                13,695                    7,410
CGT Eletrosul                             826                            504                          -                            -                                   -                              -                                1,216                   664                          -                             -                         -    -                      22                  2,042                     1,168
Total                 13,808                  7,711              3,132             1,406                  13,117               5,745                  12,549           6,389                403                 103             450 -             833          43,009            21,354

 

 

1 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

II. Generation Data
                         
II.1 Installed Capacity - MW
                         
II.1.2 Generation Assets and Generated Energy 
                         
II.1.2.1 Hydraulic Generation Assets and Generated Energy – Projects under Full Responsibility
                         
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Warranty Generated Energy (MWh)      
    (State)         (MW) (Average MW) 1Q23 2Q23 3Q23 4Q23
Eletronorte Tucuruí Complex (13) PA Hydraulics Jun-22 Dec-84 Jun-52 8,535.00 3,995.50           9,399,046      
HPP Samuel RO Hydraulics Sep-79 Jul-89 Jul-32 216.75 88.10              128,835      
HPP Curuá-Una (13) PA Hydraulics Jun-22 Jan-77 Jun-52 42.80                30.40                63,908      
HPP Balbina AM Hydraulics Mar-77 Jan-89 Mar-27                   249.75              125.70              226,739      
Chesf Curemas PB Hydraulics (1) Jan-57 Feb-26 3.52 1.00                       -         
Furnas Jaguari (16) (17) SP Hydraulics Jan-21 Jan-72 (5) 27.6 12.70             2,889.96      
Mascarenhas de Moraes (14) MG Hydraulics Jun-22 Apr-57 Jun-52 476.00 299.80              589,632      
Simplício (16) RJ Hydraulics Aug-06 Jun-13 Dec-43 305.70 166.70              583,631      
Anta RJ Hydraulics Aug-06 Aug-18 Dec-43 28.00 15.90                36,736      
Batalha (16) MG Hydraulics Aug-06 May-14 Apr-43 52.50 47.00                42,502      
Serra da Mesa (48.46%) (2) (3) (16) GO Hydraulics may/81 and Nov/04 Apr-98 May-46                1,275.00 605.70              246,558      
Manso (70%) (3) (16) MT Hydraulics Feb-00 Nov-00 Sep-37 210.00 83.50                121,841      
CGT Eletrosul HPP Governador Jayme Canet Júnior (4) (18) PR Hydraulics Jul-07 Nov-12 May-47 177.94 92.37              254,724      
HPP Passo São João (18) RS Hydraulics Aug-06 Mar-12 May-46 77.00 39.10                       -         
HPP São Domingos MS Hydraulics Dec-02 Jun-13 Aug-39 48.00 36.40                82,054      
PCH Barra do Rio Chapéu SC Hydraulics May-04 Feb-13 May-38 15.15 8.61                26,135      
PCH João Borges SC Hydraulics Dec-05 Jul-13 Sep-39 19.00 10.14                15,025      

 

 

2 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

II.1.2.2 Thermal Generation Assets and Generated Energy – Enterprises under Full Responsibility
                                 
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Warranty Generated Energy (MWh) Fuel Type Metric Unit Fuel used for electric power production
1Q23
(State) (MW) (Average MW) 1Q23 2Q23 3Q23 4Q23 Qty. R$ Million
Eletronorte TPP Araguaia (5) MT Thermal Jul-15 Apr-16 Jun-20  (6)   NA                        -           NA   NA   NA   NA 
TPP Senador Arnon Afonso Farias de Mello (6) RR Thermal Nov-00 Dec-90 (7)  NA   NA                        -           NA   NA   NA   NA 
TPP Aparecida AM Thermal N/D Feb-84 Jul-30                   166.00              150.00              159,498        Natural Gas   m3                    48,472,355                            83.76
TPP MAUÁ 3 AM Thermal Nov-14 Sep-17 Nov-44                   590.75              507.40              588,365        Natural Gas   m3                  139,409,547                          240.82
Isolated System                              
TPP ANAMÃ AM Thermal N/D Dec-18 Nov-30                       2.17  NA                   2,324        Natural Gas   m3                         907,332                               1.68
TPP ANORI AM Thermal N/D Dec-18 Nov-30                       4.57  NA                   4,105        Natural Gas   m3                       1,401,473                              2.60
TPP CAAPIRANGA AM Thermal N/D Dec-18 Nov-30                       2.17  NA                   2,206        Natural Gas   m3                         806,000                               1.50
TPP CODAJÁS AM Thermal N/D Dec-18 Nov-30                       4.57  NA                    6,113        Natural Gas   m3                      2,229,342                               4.14
Furnas Santa Cruz (7) (8) (15) RJ Thermal aug/63 and Mar/67 Jul-67 Jul-15 500.00 401.20                92,834        Natural Gas   m3                    24,278,932                            98.76
Roberto Silveira (Campos) (9) RJ Thermal Jul-07 Dec-68 Jul-27 25.00 20.90                       -           ND   ND   ND   ND 
CGT Eletrosul Candiota III – Phase C (10) RS Thermal Sep-08 Jan-11 Jul-41 350.00 262.40              229,317       Mineral Coal  Ton                        222,414                            23.35
Fuel Oil kg                        968,230                              5.40
Diesel Oil Liter                        325,817                               1.84
Fuel Lime Ton                     7,091,780                              6.08
                                 
                                 
II.1.2.3 Thermal Generation Assets of PIEs and Generated Energy – Enterprises under Full Responsibility
                                 
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Warranty Generated Energy (MWh) Fuel Type Metric Unit Fuel used for electric power production
1Q23
(State) (MW) (Average MW) 1Q23 2Q23 3Q23 4Q23 Qty. R$ Million
Eletronorte TPP Ponta Negra (PIE Gera) (11) AM Thermal NA NA NA  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
TPP Manauara (PIE Manauara) (11) AM Thermal NA NA NA  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
TPP Jaraqui (Pie Breitener Jaraqui) (11) AM Thermal NA NA NA  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
TPP Tambaqui (PIE Breitner Tambaqui) (11) AM Thermal NA NA NA  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
TPP Cristiano Rocha (PIE RAESA) (11) AM Thermal NA NA NA  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 

 

 

 

3 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

II.1.2.2 Thermal Generation Assets and Generated Energy – Enterprises under Full Responsibility
                                 
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Warranty Generated Energy (MWh) Fuel Type Metric Unit Fuel used for electric power production
1Q23
(State) (MW) (Average MW) 1Q23 2Q23 3Q23 4Q23 Qty. R$ Million
Eletronorte TPP Araguaia (5) MT Thermal Jul-15 Apr-16 Jun-20  (6)   NA                        -           NA   NA   NA   NA 
TPP Senador Arnon Afonso Farias de Mello (6) RR Thermal Nov-00 Dec-90 (7)  NA   NA                        -           NA   NA   NA   NA 
TPP Aparecida AM Thermal N/D Feb-84 Jul-30                   166.00              150.00              159,498        Natural Gas   m3                    48,472,355                            83.76
TPP MAUÁ 3 AM Thermal Nov-14 Sep-17 Nov-44                   590.75              507.40              588,365        Natural Gas   m3                  139,409,547                          240.82
Isolated System                              
TPP ANAMÃ AM Thermal N/D Dec-18 Nov-30                       2.17  NA                   2,324        Natural Gas   m3                         907,332                               1.68
TPP ANORI AM Thermal N/D Dec-18 Nov-30                       4.57  NA                   4,105        Natural Gas   m3                       1,401,473                              2.60
TPP CAAPIRANGA AM Thermal N/D Dec-18 Nov-30                       2.17  NA                   2,206        Natural Gas   m3                         806,000                               1.50
TPP CODAJÁS AM Thermal N/D Dec-18 Nov-30                       4.57  NA                    6,113        Natural Gas   m3                      2,229,342                               4.14
Furnas Santa Cruz (7) (8) (15) RJ Thermal aug/63 and Mar/67 Jul-67 Jul-15 500.00 401.20                92,834        Natural Gas   m3                    24,278,932                            98.76
Roberto Silveira (Campos) (9) RJ Thermal Jul-07 Dec-68 Jul-27 25.00 20.90                       -           ND   ND   ND   ND 
CGT Eletrosul Candiota III – Phase C (10) RS Thermal Sep-08 Jan-11 Jul-41 350.00 262.40              229,317       Mineral Coal  Ton                        222,414                            23.35
Fuel Oil kg                        968,230                              5.40
Diesel Oil Liter                        325,817                               1.84
Fuel Lime Ton                     7,091,780                              6.08
                                 
                                 
II.1.2.3 Thermal Generation Assets of PIEs and Generated Energy – Enterprises under Full Responsibility
                                 
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Warranty Generated Energy (MWh) Fuel Type Metric Unit Fuel used for electric power production
1Q23
(State) (MW) (Average MW) 1Q23 2Q23 3Q23 4Q23 Qty. R$ Million
Eletronorte TPP Ponta Negra (PIE Gera) (11) AM Thermal NA NA NA  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
TPP Manauara (PIE Manauara) (11) AM Thermal NA NA NA  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
TPP Jaraqui (Pie Breitener Jaraqui) (11) AM Thermal NA NA NA  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
TPP Tambaqui (PIE Breitner Tambaqui) (11) AM Thermal NA NA NA  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 
TPP Cristiano Rocha (PIE RAESA) (11) AM Thermal NA NA NA  NA   NA   NA   NA   NA   NA   NA   NA   NA   NA 

 

 

4 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

II.1.2.4 Solar Generation Assets and Generated Energy – Enterprises under Full Responsibility
                           
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Warranty Generated Energy (MWh)  
 
(State) (MW) (Average MW) 1Q23 2Q23 3Q23 4Q23  
CGT Eletrosul Solar Megawatt SC Solar Jun-14 Sep-14 - 0.93  NA                      363        
                           
(1) The concession for the exploration of the PCH Coremas was initially granted to the National Department of Works Against Droughts - DNOCS through Decree No. 53.417, of 1/20/1964 and later transferred to Companhia Hidro Elétrica do São Francisco - CHESF through Decree No. 74.971, of 11/26/1974.
(2) Decree No. 85.983, of May 6, 1981. Grant to FURNAS - Centrais Elétricas S.A. concession for a set of use of hydraulic energy of the stretch of the main course of the Tocantins River and its tributaries on the right and left banks, in the State of Goiás. 11.12.2004 - CC 05/2004 - HPP Serra da Mesa 
(3) Shared HPPs, but FURNAS acquires the partner fraction through energy purchase contracts - considered GF and total generation of each HPP.
(4) The reported amounts refer to the Company's participation in the enterprise (Consórcio Governador Jayme Canet Júnior 49% Eletrosul).
(5)  Ordinance MME 331 of 08.14.2018 - Dou 08.15.2018, Authorize the decontracting, in its entirety, of the Thermoelectric Generating Power Plant called TPPAraguaia. Eletronorte, through CE-CRR-0118, of 06.20.2018, requested ANEEL to revoke the authorization grant of TPP Araguaia. However, the Association of Municipalities of Araguaia - AMA filed Public Civil Action No.  2803-97.2018.811.008 against Eletronorte in the Court and Justice of Mato Grosso, having been granted urgent relief. Eletronorte, through CE-CRR-0144, dated 08.07.2018, requested ANEEL to suspend the process. On 10.11.2018 Eletronorte filed a lawsuit before the Federal Court (Case No. 1021506-05.2018.4.01.3400) to discuss the matter but still pending judgment.
By determination of RD-0249/2019 of 08.08.2019, Eletronorte through CE-CRR-0157/2019 of 08.30.2019 requested SCG/ANEEL to resume the process aiming at the revocation of the authorization grant of TPPAraguaia, pursuant to MME Ordinance No. 331 of 08.14.2018. On 11.06.2019, SCG/ANEEL requested Eletronorte to demonstrate that said Public Civil Action has no more effects. Through correspondence s/n of 11.11.2019, Eletronorte's Legal Counsel presented the requested clarifications. SCG/ANEEL sent Memorandum No. 281/2019-SCG/ANEEL to the Federal Attorney's Office with ANEEL. Considering that there was no manifestation, Eletronorte reiterated the claim of CE-CRR-0157/2019, through CE-CRR-0079/2020, of 05.26.2020.
Eletronorte, through letter CE-PR-0077/2021, of 06/17/2021, informed that it carried out the administrative closure of the Contract and completed the demobilization of the plant in June/2020.
(6) TPP Senador Arnon Afonso Farias de Mello is assigned to Roraima Energia S.A., successor of Boa Vista Energia S.A., through a loan agreement. This project is not being considered in the installed capacity of Eletronorte.
(7) Aneel was requested to extend the concession under the legal terms and term through application REQ.GCO.P.027.2013, of 07.05.2013. The conditions of said concession remain in force.
(8) Decree No. 52.394 of 08/22/1963 - authorizes Companhia Hidreletrica do Vale do Paraiba to assemble a thermoelectric plant. Decree No. 60.350 of 03/10/1967 - grants to Central Elétrica de Furnas S.A. a concession for the use of hydraulic energy, authorization for the establishment of a thermoelectric plant and other measures.
(9) TPP Roberto Silveira (Campos) is out of commercial operation, as stated in ANEEL Order 708/2019. Installed power of 25.00 MW according to ANEEL Order 484/2016.
(10) TPP Candiota III does not have a Concession Grant, but Authorization for Operation, according to MME Ordinance No. 304/2008, of 09/17/2008. The Physical Guarantee value of 262.4 MW med refers to the gross value. The enterprise's Net Physical Guarantee is 173.69 MW med.
(11) TPP Cristiano Rocha, Manauara, Ponta Negra, Tambaqui and Jaraqui are not part of Amazonas GT's own generation assets, they belong to the Independent Energy Producers – PIE, of which Amazonas GT buys its energy and resells them to Amazonas D through Power Purchase and Sale Agreements – CCVE. These energy purchase agreements of the PIE by Amazonas GT when it ends in May/2025, by contractual force, the PIE plants will be reverted to the equity of Amazonas GT (05/05/2025 reversal of the assets of the Tambaqui and Jaraqui TPPs and 05/21/2025 reversal of the assets of the Manauara, Ponta Negra and Cristiano Rocha TPPs), and it is up to them to operate them until November 30, 2030.
(12) Authorizing Resolution 7.907, of 06/18/2019, makes reference to the installed power of the Casa Nova A plant, but makes no reference to the physical guarantee of such plant. This is due to the fact that the Casa Nova A Plant does not have a Physical Guarantee defined by the MME. The amount presented of 6.8 MW comes from the plant's certification study, being only one reference.
(13) CONCESSION AGREEMENT No. 002/2022 – ANEEL - ELETRONORTE - New concession agreement for Tucuruí, Curuá-una and Coaracy Nunes HPPs, moving to 30 years.
(14) The Masc. de Moraes, Corumbá I, Estreito, Funil, Furnas, Marimbondo and P. Colômbia plants were granted the concession determined by Clause Two of Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022 as the date of signature of the contract: 06/17/2022; the final term of the concession on 06/17/2052 was determined in Annex II of Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022.
(15) By means of Order No. 481, of February 23, 2023, ANEEL released the generating unit and UG31, of 150,000.00 kW of Santa Cruz TPP to start commercial operation as of February 24, 2023.
(16) Alteration of Physical Guarantee through Ordinance No. 709/GM/MME, of November 30, 2022.
(17) According to Ordinance No. 409, of November 13, 2020, of the Ministry of Mines and Energy (MME), as of January 1, 2021, Furnas was designated as responsible for the Provision of the Electric Power Generation Service through the Jaguari Hydroelectric Power Plant, until the assumption of the winning concessionaire of the Plant bidding.
                           
                           
II.1.2.1.2 Generation Losses - %
Eletrobras Companies 1Q23 2Q23 3Q23 4Q23          
In the quarter Accumulated In the quarter Accumulated In the quarter Accumulated In the quarter Accumulated          
Eletronorte 0.90 0.90                      
Chesf 2.97 2.97                      
Furnas 0.92 0.92                      

 

5 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

II.1.2.2 Hydraulic Generation Assets and Generated Energy – Enterprises under Full Responsibility under O&M Regime - renewed by law 14.182/21
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Total Physical Guarantee Decoupled Physical Guarantee Generated Energy (MWh)        
         
(State) (MW) (Average MW) (Average MW) 1Q23 2Q23 3Q23 4Q23      
Eletronorte HPP Coaracy Nunes (2) AP Hydraulics Jun-22 Dec-75 Jun-52             78.00                   62.20                  12.44               120,713            
Chesf  Funnel (1) BA Hydraulics Jun-22 Aug-62 Jun-52             30.00                     4.80                    3.75                       -               
Stone (1) BA Hydraulics Jun-22 Nov-78 Jun-52              20.01                     1.74                    1.36                25,017            
Complexo de Paulo Afonso (1) BA Hydraulics Jun-22 Jan-55 Jun-52 4,279.60 1,658.80 1,297.72           3,030,132            
Luiz Gonzaga (Itaparica) (1) PE Hydraulics Jun-22 Jun-88 Jun-52         1,479.60                 727.00                568.75           1,423,208            
Boa Esperança (Castelo Branco) (1) PI Hydraulics Jun-22 Apr-70 Jun-52 237.30 136.20 106.55              345,921            
Xingó (1) SE Hydraulics Jun-22 Dec-94 Jun-52 3,162.00 1,729.80 1,353.27           3,561,992            
Furnas Furnas (3) MG Hydraulics Jun-22 Sep-63 Jun-52 1,216.00 625.00 125.00 1,363,426            
Luis Carlos Barreto (Strait) (3) SP/MG Hydraulics Jun-22 Mar-69 Jun-52 1,050.00 497.20 99.44 1,162,648            
Porto Colômbia (3) MG/SP Hydraulics Jun-22 Jun-73 Jun-52 320.00 205.40 41.08 291,996            
Marimbondo (3) SP/MG Hydraulics Jun-22 Oct-75 Jun-52 1,440.00 688.70 137.74 1,746,956            
Funnel (3) RJ Hydraulics Jun-22 Mar-70 Jun-52 216.00 102.40 20.48 293,990            
Corumbá I (3) GO Hydraulics Jun-22 Oct-96 Jun-52 375.00 219.50 43.90 403,544            
                                 
                                 
II.1.2.3 Hydraulic Generation Assets and Generated Energy – Projects under Full Responsibility renewed by law 13.182/15
Eletrobras Company Undertaking Location Source Start of Concession Start of Operation End of Operation Installed Capacity Physical Warranty Generated Energy (MWh)          
(State) (MW) (Average MW) 1Q23 2Q23 3Q23 4Q23        
Chesf Sobradinho (1) (4) BA Hydraulics Jun-22 Nov-79 Jun-52         1,050.30                 457.50              872,978              
Funnel (4) BA Hydraulics Jun-22 Aug-62 Jun-52             30.00                     3.75                       -                 
Stone (4) BA Hydraulics Jun-22 Nov-78 Jun-52              20.01                     1.36                25,017              
Complexo de Paulo Afonso (4) BA Hydraulics Jun-22 Jan-55 Jun-52        4,279.60              1,297.72           3,030,132              
Luiz Gonzaga (Itaparica) (4) PE Hydraulics Jun-22 Jun-88 Jun-52         1,479.60                 568.75           1,423,208              
Boa Esperança (Castelo Branco) (4) PI Hydraulics Jun-22 Apr-70 Jun-52           237.30                 106.55              345,921              
Xingó (4) SE Hydraulics Jun-22 Dec-94 Jun-52         3,162.00              1,353.27           3,561,992              
Furnas Itumbiara (3) (5) GO/MG Hydraulics Jun-22 Apr-80 Jun-52 2,082.00 948.90              428,426              
(1) The hydraulic plants had their old concession contract 006/2004 replaced by the new concession contract 001/2022. The new concessions were granted through the privatization of Eletrobras, under the terms of Law 14.182, of July 12, 2021.
(2) CONCESSION AGREEMENT No. 002/2022 – ANEEL - ELETRONORTE - New concession agreement for Tucuruí, Curuá-una and Coaracy Nunes HPPs, moving to 30 years.
(3) The plants of Corumbá I, Estreito, Funil, Furnas, Marimbondo, P. Colombia and Itumbiara were granted the concession determined by Clause Two of the Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022 as the date of signature of the agreement: 06/17/2022; the final term of the concession on 06/17/2052 was determined in Annex II of Concession Agreement No. 003/2022 signed between Furnas and ANEEL on 06/17/2022.
(4) To comply with Law 13,182/2015, Sobradinho plant provides 90% of its Physical Guarantee and the other CHESF shareholder plants provide 2.21% of their physical guarantees to serve industrial consumers served by this law.
(5) In order to comply with Law 13,182/2015, the Itumbiara plant provides 80% of its Physical Guarantee to serve industrial consumers located in the Southeast/Midwest submarket.

 

 

6 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

ACR Contracts - Quantity
                     
Eletrobras Company Auction
(if Bilateral Contract Regulated inform client)
Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Price Updated
(R$/MWh)
Accounting Position
(Procurement
/Supply)
Indexed
  CBR - OC 87495/2013 (Amazonas D) Balbina (Own) HYDRO 7/1/2021 3/1/2027  N  125.92 401.40 Procurement IPCA
  CCVE 004/2018 (Amazonas D) Tambaqui (Resale)(1) TERM 7/1/2021 5/18/2025  N  60.00 1032.27 Procurement IGP-M
  CCVE 003/2018 (Amazonas D) Jaraqui (Resale)(1) TERM 7/1/2021 5/18/2025  N  60.00 1028.90 Procurement IGP-M
  CCVE 002/2018 (Amazonas D) Manauara (Reseller)(1) TERM 7/1/2021 5/18/2025  N  60.00 934.12 Procurement IGP-M
  CCVE 001/2018 (Amazonas D) Ponta Negra (Resale)(1) TERM 7/1/2021 5/18/2025  N  60.00 945.59 Procurement IGP-M
Eletronorte CCVE 005/2018 (Amazonas D) Cristiano Rocha (Resale)(1) TERM 7/1/2021 5/18/2025  N  65.00 959.19 Procurement IGP-M
  CCVE 008/2018 (Amazonas D - Sist. Isolated) Caapiranga  (Own) TERM 7/1/2021 11/30/2030  N  1.19 1364.57 Procurement IPCA
  CCVE 006/2018 (Amazonas D - Sist. Isolated) Anamã (Own) TERM 7/1/2021 11/30/2030  N  1.27 1422.35 Procurement IPCA
  CCVE 009/2018 (Amazonas D - Sist. Isolated) Codajás (Own) TERM 7/1/2021 11/30/2030  N  3.01 1368.17 Procurement IPCA
  CCVE 007/2018 (Amazonas D - Sist. Isolated) Anori (Own) TERM 7/1/2021 11/30/2030  N  2.51 1312.56 Procurement IPCA
  CCESI 001/2019 (Amazonas D - Sist. Isolated) Coari (Reseller)(1) TERM 7/1/2021 11/30/2030  N  12.00 1075.45 Procurement IPCA
  27th Existing Energy Auction Tucuruí HYDRO 1/1/2023 12/31/2024  N  51.00 200.00 Procurement IPCA
CGT Eletrosul 1st New Energy Auction Passo São João HYDRO 1/1/2010 12/31/2039 S 37.00 285.21 Procurement IPCA
3rd New Energy Auction Governor Jayme Canet Junior HYDRO 1/1/2011 12/31/2040 S 94.08 277.82 Procurement IPCA
5th New Energy Auction São Domingos HYDRO 1/1/2012 12/31/2041 SE/CO 36.00 299.05 Procurement IPCA
2nd Reserve Energy Auction CERRO CHATO I EOL 7/1/2012 6/30/2032 S 10.73 280.26 Procurement IPCA
2nd Reserve Energy Auction CERRO CHATO II EOL 7/1/2012 6/30/2032 S 11.09 280.26 Procurement IPCA
2nd Reserve Energy Auction CERRO CHATO III EOL 7/1/2012 6/30/2032 S 11.11 280.26 Procurement IPCA
Chesf 5th Reserve Energy Auction Acauã EOL 9/1/2015 8/31/2035  NE  2.60 184.19 Procurement IPCA
5th Reserve Energy Auction Angical 2 EOL 9/1/2015 8/31/2035  NE  4.90 184.19 Procurement IPCA
5th Reserve Energy Auction Arapapá EOL 9/1/2015 8/31/2035  NE  1.90 184.19 Procurement IPCA
5th Reserve Energy Auction Caititu 2 EOL 9/1/2015 8/31/2035  NE  5.10 184.19 Procurement IPCA
5th Reserve Energy Auction Caititu 3 EOL 9/1/2015 8/31/2035  NE  4.70 184.19 Procurement IPCA
5th Reserve Energy Auction Carcará EOL 9/1/2015 8/31/2035  NE  4.60 184.19 Procurement IPCA
5th Reserve Energy Auction Corrupião 3 EOL 9/1/2015 8/31/2035  NE  4.20 184.19 Procurement IPCA
5th Reserve Energy Auction Teiú 2 EOL 9/1/2015 8/31/2035  NE  3.70 184.19 Procurement IPCA
Furnas 1st New Energy Auction Manso HYDRO 1/1/2008 12/31/2037  SE/CO  35.00 246.80 Procurement IPCA
1st New Energy Auction Manso HYDRO 1/1/2010 12/31/2039  SE/CO  55.00 284.83 Procurement IPCA
1st New Energy Auction Batalha HYDRO 1/1/2010 12/31/2039  SE/CO  47.00 289.39 Procurement IPCA
1st New Energy Auction Simplício HYDRO 1/1/2010 12/31/2039  SE/CO  185.00 292.36 Procurement IPCA
                     
(1) Energy sales contracts resulting from the process of unbundling of Amazonas Distribuidora -> Process: 48500.004245/2012-43 -ANEEL. The amounts of energy traded come from the purchase of PIEs.
                     
                     
ACR Contracts - Availability
                     
Eletrobras Company Auction
(if Bilateral Contract Regulated inform client)
Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Updated Fixed Revenue
(R$ thousand/year)
Accounting Position
(Procurement
/Supply)
Indexed
Eletronorte 20th New Energy Auction Mauá 3 TERM 7/1/2021 11/30/2030 N 484.4 1,445,449.30 Procurement IPCA
20th New Energy Auction Aparecida TERM 7/1/2021 11/30/2030  N  145.00 430,217.38 Procurement IPCA
CGT Eletrosul 17th New Energy Auction UUT Coxilha Seca EOL 1/1/2016 12/31/2035 S 8.3 15,915.78 Procurement IPCA
17th New Energy Auction UUT Capão do Inglês EOL 1/1/2016 12/31/2035  S  2.80 5,383.16 Procurement IPCA
17th New Energy Auction UUT Warehouses EOL 1/1/2016 12/31/2035 S 2.1 4,066.62 Procurement IPCA
1st New Energy Auction TPP Candiota (2) TER 1/1/2010 12/31/2024  S  227.00 624,886.04 Procurement IPCA
Chesf 18th New Energy Auction Casa Nova II EOL 1/1/2018 12/31/2037 NE 7.1 13,622.79 Procurement IPCA
18th New Energy Auction Casa Nova III EOL 3/1/2018 12/31/2037  NE  5.50 10,549.49 Procurement IPCA
17th New Energy Auction Coqueirinho 2 EOL 9/19/2019 12/31/2035 NE 7.30 13,699.58 Procurement IPCA
17th New Energy Auction Papagaio EOL 10/4/2019 12/31/2035  NE  4.70 8,785.69 Procurement IPCA
18th New Energy Auction Tamanduá Mirim 2 EOL 11/14/2019 12/31/2037  NE  7.20 13,176.37 Procurement IPCA
Furnas 5th New Energy Auction Santa Cruz Nova TERM 1/1/2012 12/31/2026  SE/CO  245.70 308,421.35 Procurement IPCA
                     
2) The amount of Fixed Revenue expected for the year is R$624,893,402.15. Added to this are CCEE financial adjustment debts of R$7,630.22 (up to 1Q23).

 

 

7 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

PIEs resulting from the process of deverticalization of Amazonas Distribuidora
                             
The Power Purchase and Sale Agreements from the PIEs (quantity contracts) are due to the process of unbundling of Amazonas Distribuidora -> Process: 48500.004245/2012-43 -ANEEL.
Eletronorte buys energy from the PIEs, the price of which does not include the cost of fuel (gas). Eletronorte sells the same amount purchased from the PIEs to the distributor Amazonas Energia, including the fuel cost in the fee, so that the energy purchase and sale operations do not reflect the economic impact for Eletronorte ("pass-through"). The gas supply contact that serves the Amazon thermal plants was made between Eletronorte and Petrobras.
Eletronorte's energy purchase contracts for the PIEs expire in May 2025, as well as the current sales contracts for Amazonas Energia. From that date, the assets will be converted to Eletronorte.
As a result of MP 855/2018, new energy sales contracts will be entered into with Amazonas Energia for supply after that date, of the CCEAR type, with a term until November 2030 (date linked to the Gas supply contract).
                             
                             
Power Purchase Agreements from PIEs (contracts by quantity)
                      1Q23 2Q23 3Q23 4Q23
Eletrobras Company Counterparty Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Price Updated
(R$/MWh)
Accounting Position
(Procurement
/Supply)
Indexed R$ Million R$ Million R$ Million R$ Million
Eletronorte PIE TAMBAQUI Tambaqui TERM 7/1/2021 5/18/2025  N  60.00 442.99 Procurement IGP-M                    58,782.72      
PIE JARAQUI Jaraqui TERM 7/1/2021 5/18/2025  N  60.00 444.36 Procurement IGP-M                    58,807.42      
PIE MANAUARA Manauara TERM 7/1/2021 5/18/2025  N  60.00 396.92 Procurement IGP-M                    52,853.55      
PIE Gera Ponta Negra TERM 7/1/2021 5/18/2025  N  60.00 416.06 Procurement IGP-M                    54,777.86      
PIE Cristiano Rocha Cristiano Rocha TERM 7/1/2021 5/18/2025  N  65.00 429.46 Procurement IGP-M                     61,941.28      
PIE Coari Coari TERM 7/1/2021 11/30/2030  N  12.00 495.28 Procurement IGP-M                    12,054.50      
                             
                             
Energy Sale Contracts, from the Energy Purchases of the PIEs, for the distributor (quantity contracts)
                      1Q23 2Q23 3Q23 4Q23
Eletrobras Company Auction
(if Bilateral Contract Regulated inform client)
Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Price Updated
(R$/MWh)
Accounting Position
(Procurement
/Supply)
Indexed R$ Million R$ Million R$ Million R$ Million
Eletronorte CCVE 004/2018 (Amazonas D) Tambaqui TERM 7/1/2021 5/18/2025  N  60.00 1032.27 Procurement IGP-M 137,185.28      
CCVE 003/2018 (Amazonas D) Jaraqui TERM 7/1/2021 5/18/2025  N  60.00 1028.90 Procurement IGP-M 136,353.70      
CCVE 002/2018 (Amazonas D) Manauara TERM 7/1/2021 5/18/2025  N  60.00 934.12 Procurement IGP-M 124,588.52      
CCVE 001/2018 (Amazonas D) Ponta Negra TERM 7/1/2021 5/18/2025  N  60.00 945.59 Procurement IGP-M 124,685.48      
CCVE 005/2018 (Amazonas D) Cristiano Rocha TERM 7/1/2021 5/18/2025  N  65.00 959.19 Procurement IGP-M 138,567.81      
CCESI 001/2019 (Amazonas D - Sist. Isolated) Coari TERM 7/1/2021 11/30/2030  N  51.00 1,075.45 Procurement IPCA 26,257.83      
                             
                             
ACR Contracts - Availability - Thermal
                      1Q23 2Q23 3Q23 4Q23
Eletrobras Company Auction
(if Bilateral Contract Regulated inform client)
Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Updated Fixed Revenue
(R$ thousand/year)
Accounting Position
(Procurement
/Supply)
Indexed R$ Million R$ Million R$ Million R$ Million
Eletronorte 20th New Energy Auction Mauá 3 TERM 7/1/2021 11/30/2030 N 484.4 1,445,449.30 Procurement IPCA 362,019.14      
20th New Energy Auction Aparecida TERM 7/1/2021 11/30/2030  N  145.00 430,217.38 Procurement IPCA 111,766.85      
CGT Eletrosul 1st New Energy Auction TPP Candiota (1) TERM 1/1/2010 12/31/2024  S  227.0 624,886.04 Procurement IPCA 153,338.03      
Furnas 5th New Energy Auction Santa Cruz Nova TERM 1/1/2012 12/31/2026  SE/CO  245.70 308,421.35 Procurement IPCA 77,105.34      
                             
1) The amount of Fixed Revenue expected for the year is R$624,893,402.15. Added to this are CCEE financial adjustment debts of R$7,630.22 (up to 1Q23).
                             
                             
CVU and Thermal Inflexibility with Availability Contracts
                             
Eletrobras Company Power plant Installed Capacity 1Q23 2Q23 3Q23 4Q23        
(MW)  Average inflexibility (MWmed) Average CVU
(R$/MWh)
 Average inflexibility (MWmed) Average CVU
(R$/MWh)
 Average inflexibility (MWmed) Average CVU
(R$/MWh)
 Average inflexibility (MWmed) Average CVU
(R$/MWh)
       
Eletronorte TPP Mauá 3 590.8 244.5 109.81                    
TPP Aparecida 166.0 72.1 109.81                    
CGT Eletrosul TPP Candiota III 350.0 102.4 103.83                    
Furnas TPP Santa Cruz 350.0 0 225.74                    

 

8 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

Furnas Total Furnas Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 1,883.26      
  GAGO&M  R$ million 75.09      
  GAGImprovements  R$ million 92.87      
  CAIMI R$ million 12.05      
  Adjustment by Unavailability R$ million 10.21      
  R&D R$ million 24.45      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 82.32      
  CFURH R$ million 29.18      
  PIS/COFINS R$ million 33.25      
  TOTAL R$ million 359.42      
             
  Furnas Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 500.00      
  GAGO&M  R$ million 18.90      
  GAGImprovements  R$ million 19.04      
  CAIMI R$ million 3.15      
  Adjustment by Unavailability R$ million 2.91      
  R&D R$ million 0.69      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 25.35      
  CFURH R$ million 7.26      
  PIS/COFINS R$ million 7.88      
  TOTAL R$ million 85.19      
             
  Luis Carlos Barreto (Strait) Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 397.76      
  GAGO&M  R$ million 15.34      
  GAGImprovements  R$ million 21.66      
  CAIMI R$ million 2.72      
  Adjustment by Unavailability R$ million 2.71      
  R&D R$ million 22.95      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 2.58      
  CFURH R$ million 6.39      
  PIS/COFINS R$ million 7.58      
  TOTAL R$ million 81.94      
             
  Porto Colômbia Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 164.32      
  GAGO&M  R$ million 6.79      
  GAGImprovements  R$ million 7.81      
  CAIMI R$ million 0.83      
  Adjustment by Unavailability R$ million -0.51      
  R&D R$ million 0.11      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 6.39      
  CFURH R$ million 2.11      
  PIS/COFINS R$ million 2.40      
  TOTAL R$ million 25.90      
             
  Marimbondo Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 550.96      
  GAGO&M  R$ million 20.62      
  GAGImprovements  R$ million 30.19      
  CAIMI R$ million 3.73      
  Adjustment by Unavailability R$ million 3.56      
  R&D R$ million 0.47      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 36.36      
  CFURH R$ million 9.35      
  PIS/COFINS R$ million 10.63      
  TOTAL R$ million 114.91      
             
  Funil Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 81.92      
  GAGO&M  R$ million 4.89      
  GAGImprovements  R$ million 5.21      
  CAIMI R$ million 0.56      
  Adjustment by Unavailability R$ million 0.62      
  R&D R$ million 0.07      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 2.54      
  CFURH R$ million 1.76      
  PIS/COFINS R$ million 1.59      
  TOTAL R$ million 17.24      
             
  Corumbá I Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 175.60      
  GAGO&M  R$ million 7.04      
  GAGImprovements  R$ million 7.81      
  CAIMI R$ million 0.97      
  Adjustment by Unavailability R$ million 0.93      
  R&D R$ million 0.13      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 8.74      
  CFURH R$ million 2.29      
  PIS/COFINS R$ million 2.84      
  TOTAL R$ million 30.75      
             
  Jaguari Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 12.70      
  GAGO&M  R$ million 1.51      
  GAGImprovements  R$ million 1.16      
  CAIMI R$ million 0.09      
  Adjustment by Unavailability R$ million 0.00      
  R&D R$ million 0.03      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 0.36      
  CFURH R$ million 0.02      
  PIS/COFINS R$ million 0.32      
  TOTAL R$ million 3.49      

 

 

9 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

Eletronorte Total Eletronorte Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 50.00      
  GAGO&M  R$ million 2.49      
  GAGImprovements  R$ million 2.46      
  CAIMI R$ million 0.20      
  Adjustment by Unavailability R$ million 0.29      
  R&D R$ million 0.07      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 1.49      
  Amazonas Tax Substitution R$ million 0.07      
  CFURH R$ million 0.77      
  PIS/COFINS R$ million 0.79      
  TOTAL R$ million 8.64      
             
  Coaracy Nunes Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 50.00      
  GAGO&M  R$ million 2.49      
  GAGImprovements  R$ million 2.46      
  CAIMI R$ million 0.20      
  Adjustment by Unavailability R$ million 0.29      
  R&D R$ million 0.07      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 1.49      
  Amazonas Tax Substitution R$ million 0.07      
  CFURH R$ million 0.77      
  PIS/COFINS R$ million 0.79      
  TOTAL R$ million 8.64      

 

 

10 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

Chesf Total Chesf Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 3,331.41      
  GAGO&M  R$ million 105.40      
  GAGImprovements  R$ million 178.55      
  CAIMI R$ million 23.33      
  Adjustment by Unavailability R$ million 31.66      
  R&D R$ million 5.37      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 197.16      
  CFURH R$ million 59.26      
  PIS/COFINS R$ million 61.23      
  TOTAL R$ million 661.95      
             
  Boa Esperança Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 106.55      
  GAGO&M  R$ million 5.57      
  GAGImprovements  R$ million 5.15      
  CAIMI R$ million 0.60      
  Adjustment by Unavailability R$ million 0.95      
  R&D R$ million 0.17      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 4.84      
  CFURH R$ million 2.37      
  PIS/COFINS R$ million 2.00      
  TOTAL R$ million 21.65      
             
  Complexo Paulo Afonso Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 1,297.72      
  GAGO&M  R$ million 47.89      
  GAGImprovements  R$ million 97.64      
  CAIMI R$ million 10.84      
  Adjustment by Unavailability R$ million 14.64      
  R&D R$ million 2.64      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 92.43      
  CFURH R$ million 21.42      
  PIS/COFINS R$ million 29.31      
  TOTAL R$ million 316.81      
             
  Pedra Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 1.36      
  GAGO&M  R$ million 0.64      
  GAGImprovements  R$ million 0.58      
  CAIMI R$ million 0.05      
  Adjustment by Unavailability R$ million -0.13      
  R&D R$ million 0.02      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 0.48      
  CFURH R$ million 0.19      
  PIS/COFINS R$ million 0.19      
  TOTAL R$ million 2.01      
             
  Funil Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 3.76      
  GAGO&M  R$ million 0.95      
  GAGImprovements  R$ million 1.19      
  CAIMI R$ million 0.08      
  Adjustment by Unavailability R$ million -0.22      
  R&D R$ million 0.03      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 0.78      
  CFURH R$ million 0.05      
  PIS/COFINS R$ million 0.29      
  TOTAL R$ million 3.14      
             
  Luiz Gonzaga Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 568.75      
  GAGO&M  R$ million 19.72      
  GAGImprovements  R$ million 26.81      
  CAIMI R$ million 3.75      
  Adjustment by Unavailability R$ million 6.32      
  R&D R$ million 0.89      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 32.10      
  CFURH R$ million 10.06      
  PIS/COFINS R$ million 10.16      
  TOTAL R$ million 109.81      
             
  Xingó Unit 1Q23 2Q23 3Q23 4Q23
  Physical Warranty  MWaverage 1,353.27      
  GAGO&M  R$ million 30.63      
  GAGImprovements  R$ million 47.17      
  CAIMI R$ million 8.01      
  Adjustment by Unavailability R$ million 10.09      
  R&D R$ million 1.62      
  Other (Uses, Connections, Charges, TFSEE, Other Adjustments, etc.) R$ million 66.53      
  CFURH R$ million 25.17      
  PIS/COFINS R$ million 19.29      
  TOTAL R$ million 208.53      

 

 

11 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  Energy Balance            
               
   Energy Balance (MWmed)   2023 2024 2025 2026 2027
  Resources without impact on the balance sheet (1) 1,419 1,419 1,192 1,192 946
               
  Resources (A)   11,760 13,042 14,312 15,470 16,636
    Own Resources (2) (3) (4) (5) 10,476 11,810 13,113 14,360 15,607
    Purchase of Energy 1,283 1,232 1,199 1,110 1,029
  Sales (B)   8,875 7,698 5,677 4,406 4,050
    ACL – Bilateral Contracts + MCP performed (6) 6,357 4,662 3,252 1,981 1,720
    ACR – Except quotas 2,519 3,036 2,425 2,425 2,330
               
  Average Prices Contracts performed Average Price of Sales Contracts signed until 03/31/2023 (ACR and ACL - R$/MWh) 209.43 209.86 202.05 217.45 220.58
               
   Balance (A - B)   2,885 5,344 8,635 11,064 12,586
   Balance considering hedge estimate (9)   1,445 3,031 6,074 8,255 9,528
      Discontracted Energy considering hedge estimate (9) 11% 21% 39% 50% 54%
   
  Contracts entered into until 03/31/2023. 
  It should be noted that the balance sheet is considering SPE Santo Antônio Energia, consolidated by Furnas as of 3Q22, whether in resources, sales or average prices.
(1) The balance sheet does not include, whether in resources, requirements(sales) or average prices, the PIEs contracts arising from the process of unbundling of Amazonas Distribuidora, the contracts of thermal plants by availability and the Physical Guarantee Quotas. These resources are presented in order to compose the total resources considered.
(2) The Own Resources include the Decoupling plants (new PIEs) and the New Grants (Sobradinho, Itumbiara, Tucuruí, Curuá-Una and Mascarenhas de Moraes). For hydroelectric projects, an estimate of GFIS2 was considered, that is, the Physical Guarantee considering the Adjustment Factors due to Internal Losses, Losses in the Basic Network and Availability and adjustments due to the particularities of the portfolio.
(3) The revised Physical Guarantee values are considered as defined in Ordinance No. 709/GM/MME, of November 30, 2022
(4) With the decoupling, the plants currently under quota regime now have a new concession under the Independent Energy Producer - PIE regime, gradually occurring in a period of 5 years from 2023. The Physical Guarantee values were defined in Ordinance GM/MME No. 544/21.
(5) Considering the new concession grants from 2023 for the Sobradinho, Itumbiara, Tucuruí, Curuá-Una and Mascarenhas de Moraes plants, whose Physical Guarantee values were defined in GM/MME Ordinance No. 544/21.
(6) It should be noted that, for the contracts in the ACL, there were reductions in the contracted amounts agreed under the aegis of Law 13.182/2015 (Itumbiara HPP), pursuant to §§ 12, 12-A and 12-B of art. 10 of said order, transcribed in Clause 6 of the contracts, which are effective from the years 2023 and 2024. The amounts presented consider, on the one hand, these reductions, but also the volumes of the new contracts signed.
               
  Physical Guarantee Quotas of Hydroelectric Plants (MWmed) 2023 2024 2025 2026 2027
    Physical Guarantee Quotas (7) (8) 5,252 3,939 2,626 1,313 0
(7)  The Physical Guarantee of the HPP Jaguari, of 12.7 MWmed, whose concession is under the provisional administration of Furnas, is not included here.
(8) Decoupling occurs gradually over a period of 5 years from 2023. The Physical Guarantee values considered from 2023 were those defined in Ordinance GM/MME No. 544/21.
(9) The values present an estimate of the energy discontracted. For the year 2023, the estimate of GSF of the CCEE, of the CCEE Information of 04/25/2023, of 86.1% was considered. For the other years, a historical average value of GSF, from 2017 to 2022, of 80.1% was considered. Source: CCEE, obtained on the CCEE website, at the following link: https://www.ccee.org.br/dados-e-analises/dados-geracao, in the MRE option on the panel.
It should be noted that this is only an estimate, based on facts that have occurred in the past. The graph with the historical values of GSF is presented below.

 

 

12 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

II.1.3.Sold Energy
                   
II.1.3.1 Energy Sold by enterprises not renewed by Law 12.783/13 and Law 13.182/15
Eletrobras Company Buyer 1Q23 2Q23 3Q23 4Q23
R$ Million MWh R$ Million MWh R$ Million MWh R$ Million MWh
Eletronorte  Eletrobras System 63.35 235,440            
Other 2,107.78 6,446,576            
Chesf Eletrobras System                
Other 161.62 1,027,080            
Furnas (1) Eletrobras System                
Other 1,971.01 9,353,918            
CGT Eletrosul Eletrobras System                
Other 377.92 1,715,975            
                   
Notes:         
(1) Includes Saesa                  
                   
                   
                   
Discontinued operation
Eletronuclear Eletrobras System                
Other                
Itaipu Binacional (1) Eletrobras System                
Other                
                   
(1) Values of Itaipu Binacional in US$ Million. To the extent that there has not yet been a resolution by the Board of Directors of ITAIPU Binacional on the amount to be considered for the year 2022 of the Unit Cost of the Electricity Service of ITAIPU Binacional (CUSE), payments are occurring provisionally, without the issuance of an invoice, leaving for the future the payment of any differences between the provisional payments and the amounts to be presented in the final invoices, when issued.
                   
                   
                   
II.1.3.2 Energy Sold by the renewed enterprises under Law 12.783/13 – O&M Regime
Eletrobras Company Buyer 1Q23 2Q23 3Q23 4Q23
R$ Million MWh R$ Million MWh R$ Million MWh R$ Million MWh
Eletronorte Eletrobras System                
Other 8.64 108,000            
Chesf  Eletrobras System                
Other 661.95 7,195,848            
Furnas  Eletrobras System                
Other 359.42 4,067,842            
CGT Eletrosul Eletrobras System                
Other                
                   
                   
                   
II.1.3.2 Energy Sold by renewed enterprises under Law 13.182
Eletrobras Company Buyer 1Q23 2Q23 3Q23 4Q23
R$ Million MWh R$ Million MWh R$ Million MWh R$ Million MWh
Eletronorte Eletrobras System                
Other                
Chesf  Eletrobras System                
Other 166.86 973,962            
Furnas  Eletrobras System                
Other 247.16 1,313,906            
CGT Eletrosul Eletrobras System                
Other                

 

 

13 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

II.1.4 Energy Purchased for Resale
Eletrobras Company Buyer 1Q23 2Q23 3Q23 4Q23
R$ Million MWh R$ Million MWh R$ Million MWh R$ Million MWh
Eletronorte Eletrobras System                
Other 300.59 706,381            
Chesf Eletrobras System                
Other 54.58 203,723            
Furnas (1) Eletrobras System                
Other 492.08 2,103,612            
CGT Eletrosul Eletrobras System 63.35 235,440            
Other 107.15 480,172            
                   
Note: Gross values. The accounting publishes net amounts of recoverable PIS/COFINS.
Note: It includes only purchase contracts, not considering the negative values of the CCEE accounting.
(1) Includes Saesa

 

 

14 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

II.1.5 Average fee – R$/MWh
           
II.1.5.1 Projects not renewed under Law No. 12.783/13
Eletrobras Company 1Q23 2Q23 3Q23 4Q23 2023
Eletronorte  324.92        
Chesf (1) 164.16        
Furnas (1) 207.93        
CGT Eletrosul 220.24        
           
(1) Includes enterprises affected by Law 13.182.
- Selling prices calculated from the total revenue divided by the energy sold.
- Purchase prices calculated from the total expenditure divided by the energy purchased.
- Does not include projects not renewed by Law 12.783/13.
           
Discontinued operation          
Electronuclear (4)          
Itaipu (2) (3)          
(2) Values in U$/KW. PRELIMINARY AMOUNT, to the extent that there has not yet been a resolution by the Board of Directors of ITAIPU Binacional on the amount to be considered for the year 2022 of the Unit Cost of the Electricity Service of ITAIPU Binacional (CUSE)
(3) Fee, defined in ITAIPU as the unit cost of the electricity service, used in the billing of the contracted power.
(4) Defined fee considering the Fixed Revenue of Eletronuclear by the contracted energy.
           
II.1.5.2 Projects renewed under the terms of Law No. 12.783 – O&M Regime  
Eletrobras Company 1Q23 2Q23 3Q23 4Q23 2023
Eletronorte 79.98        
Chesf  91.99        
Furnas  88.36        
Eletronuclear          
CGT Eletrosul          
Itaipu Binacional          
           
Note: Estimated rates considering the ratio between the Total Revenue in the period and the Physical Guarantee in the period (MWh).

 

 

15 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

III.1.1 Extension of Transmission Lines - Undertakings not renewed under Law 12.783/13 –km
                       
Eletrobras Company  765 KV 750 KV 600 KV 525 KV 500 KV 440 KV 345 KV 230 KV 138 KV <138 KV Total
Eletronorte  0.00 0.00 0.00 0.00 0.00 0.00 0.00 1735.20 0.00 111.0 1846.2
Chesf  0.00 0.00 0.00 0.00 255.97 0.00 0.00 2360.23 0.00 0.0 2616.2
Furnas 0.00 0.00 0.00 0.00 844.00 0.00 161.00 331.70 0.00 0.0 1336.7
CGT Eletrosul 0.00 0.00 0.00 1769.90 186.70 0.00 0.00 1069.60 0.00 0.0 3026.2
Total  0.00 0.00 0.00 1769.90 1286.67 0.00 161.00 5496.73 0.00 111.0 8825.3
                       
III.1.2 Extension of Transmission Lines – Projects renewed pursuant to Law 12.783/13 - km
                       
Eletrobras Company 765 KV 750 KV 600 KV 525 KV 500 KV 440 KV 345 KV 230 KV 138 KV <138 KV Total
Eletronorte  0.00 0.00 0.00 0.00 3236.46 0.00 0.00 5189.40 222.17 2.3 8650.3
Chesf  0.00 0.00 0.00 0.00 5436.07 0.00 0.00 13251.31 368.60 174.2 19230.2
Furnas 2698.00 0.00 3224.00 0.00 4049.30 0.00 6202.30 2041.60 1451.00 165.0 19831.2
CGT Eletrosul 0.00 0.00 0.00 422.50 2171.50 0.00 0.00 5076.88 1438.90 0.0 9109.8
Total  2698.00 0.00 3224.00 422.50 14893.33 0.00 6202.30 25559.19 3480.67 341.5 56821.5
                       
III.1.3 Others - lines without RAP defined in REH 2725/2020 and not linked to any of the other contracts
                       
Eletrobras Company 765 KV 750 KV 600 KV 525 KV 500 KV 440 KV 345 KV 230 KV 138 KV <138 KV Total
Eletronorte  0.00 0.00 0.00 0.00 10.71 0.00 0.00 193.05 218.09 2.8 424.6
Chesf  0.00 0.00 0.00 0.00 0.00 0.00 0.00 75.70 93.80 21.3 190.8
Furnas 0.00 0.00 0.00 0.00 0.00 0.00 0.00 66.00 419.30 0.0 485.3
CGT Eletrosul 0.00 0.00 0.00 59.30 0.00 0.00 0.00 3.10 90.30 89.0 241.7
Total  0.00 0.00 0.00 59.30 10.71 0.00 0.00 337.85 821.49 113.1 1342.4
                       
I.2 Transmission Lines - Km
                       
Company Comprehensive Responsibility (a) Comprehensive Liability under O&M Regime (b) Other                (c) SPEs (d) Net aggregation 1Q23 Total (a+b+c+d) SPE Voltage greater than or equal to 230 KV TOTAL SPE Total Corporate Corporate + Total SPE  
Chesf                      2,616.2                       19,230.2                     190.8              1,810.8                  29.0           23,848.0                       1,810.8              1,810.8           22,037.2           23,848.0  
Eletrobras Holding                             -                                    -                             -                        -                        -                        -                                  -                        -                        -                        -     
Eletronorte                      1,846.2                        8,650.3                    424.6             1,044.9                     -                11,966.1                       1,044.9             1,044.9            10,921.2             11,966.1  
CGT Eletrosul                      3,026.2                         9,109.8                     241.7                     -                       9.0           12,377.7                               -                        -              12,377.7           12,377.7  
Furnas                      1,336.7                       19,831.2                    485.3              4,101.0                    8.0           25,754.2                      3,885.9              4,101.0           21,653.2           25,754.2  
Total             8,825.3               56,821.5           1,342.4       6,956.7            46.0      73,945.9               6,741.6       6,956.7      66,989.3      73,945.9  

 

 

16 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

Projects renewed pursuant to Law 12.783/13
Company Contract Readjustment index No. of associated substations Total Km RBSE PRC RAP OTHERS
 (***)
Total Gross RAP for Contract
cycle 2022/2023
Duration of the contract Reduction Date of RAP 50% after 15 years Next readjustment date
PRT MME 579/12 (O&M) PRT MME 120/16 (Indemnity and O&M) PRT MME 579/12 (O&M) PRT MME 120/16 (Indemnity and O&M) Start Date End Date
CHESF  061/2001 IPCA 112 19230.2 905,869,615.81 1,948,077,459.32 88,954,341.19 136,424,820.75 476,909,346.25 3,556,235,583.32 jan/13 jan/43 N/A 1-Jul-23
FURNAS  062/2001 IPCA 64 19831.2 770,844,067.81 2,196,705,020.42 436,742,027.67 1,165,528,634.36 543,817,146.34 5,113,636,896.60 jan/13 jan/43 N/A
ELETRONORTE  058/2001 IPCA 48 8650.3 551,802,934.64 998,645,930.12 30,736,168.15 33,931,233.38 293,729,454.98 1,908,845,721.27 jan/13 jan/43 N/A
CGT ELETROSUL    057/2001 IPCA 58 9109.8 307,999,993.36 356,324,171.41 38,257,345.16 37,902,726.80 174,157,337.01 914,641,573.74 jan/13 jan/43 N/A
Total       56821.5 2,536,516,611.62 5,499,752,581.27 594,689,882.17 1,373,787,415.29 1,488,613,284.58 11,493,359,774.93        
                             
Remarks                            
1. Substations may be associated with more than one contract.
2. There are RAPs that exceed the effective date of the contract and there is still no regulation of the form of payment, that is, via indemnity or contract extension. For verification of these RAPs, see the list of modules attached to Aneel's approval resolution for the current cycle, available on the Eletrobras website.
3. PRT MME 579/12 - Defined the initial RAP, referred to in art. 13 of Provisional Measure No. 579, of 2012, of the facilities that are part of the electric power transmission concessions framed in art. 6 of said Provisional Measure, subject to the decision provided for in art. 12.
4. PRT MME 120/16  - Determined that the amounts approved by the National Electric Energy Agency - ANEEL related to the assets provided for in art. 15, § 2, of Law No. 12,783, of January 11, 2013, became part of the Regulatory Remuneration Base of electric power transmission concessionaires and that the cost of capital was added to the respective Annual Permitted Revenues.
5. (*) Other revenue: RBNI, RBNIA, RCDM, REQ, RICG, RICGNI, RMEL, RMELP and RPEC.
6. The aggregations of RAP since the approval of REH 3.067/2022, which already have TLP or TLD issued, are already being considered, with R$50.4 million in the renewed contracts,  R$28.8 million in the other quotations, including in this total the value of the TGO RAP, incorporated by FURNAS on  11/18/2022, resulting in a total of R$79,206,666.17 since REH 3.067/2022.
Projects not renewed under Law 12.783/13
                             
Company Contract Readjustment index No. of associated substations Total Km Total Rap for Contract
cycle 2022/2023
Duration of the contract Reduction Date of RAP 50% after 15 years Next readjustment date          
Start Date End Date   Totals  
CHESF             007/2005 IGPM      2 208.1 38,229,706.07 4/3/2005 4/3/2035 dec/22          1-Jul-23   Company Regulatory RAP km  
            008/2005 IGPM      2 119.8 14,079,138.01 4/3/2005 4/3/2035 sep/24            CHESF 4,130,122,584.53 22,037.23  
            010/2007 IPCA      2 94.5 20,536,032.86 06/14/2007      06/14/2037      aug/27            FURNAS 5,497,739,493.36 21,653.20  
            012/2007 IPCA      4 316.0 15,717,841.04 06/14/2007      06/14/2037      sep/25 and Apr/29   ELETRONORTE 2,543,412,511.58 10,921.18  
            005/2008 IPCA      3 110.2 6,044,498.72 03/17/2008      03/17/2038      N/A               CGT ELETROSUL   1,606,638,051.13 12,377.68  
            014/2008 IPCA      2 145.0 9,180,477.63 10/16/2008      10/16/2038      N/A               Total 13,777,912,640.60                              66,989.3  
            006/2009 IPCA      3 49.0 28,677,109.34 01/28/2009      01/28/2039      N/A                      
            017/2009 IPCA      5 95.6 41,203,125.49 3/8/2009 3/8/2039 N/A                      
            018/2009 IPCA      2 144.8 10,259,617.15 3/8/2009 3/8/2039 N/A                      
            004/2010 IPCA      4 34.3 44,584,453.61 12/7/2010 11/7/2040 N/A                      
            007/2010 IPCA      1 0.0 14,894,729.60 12/7/2010 12/7/2040 N/A                      
            013/2010 IPCA      1 0.0 14,788,331.93 6/10/2010 6/10/2040 N/A                      
            014/2010 IPCA      1 0.0 8,731,566.74 6/10/2010 6/10/2040 N/A                      
            019/2010 IPCA      7 321.0 30,168,173.98 11/23/2010      11/23/2040      N/A                      
            020/2010 IPCA      2 115.0 13,113,275.42 11/23/2010      11/23/2040      N/A                      
            021/2010 IPCA      2 91.3 10,546,995.68 11/23/2010      11/23/2040      N/A                      
            008/2011 IPCA      5 285.0 86,487,344.37 10/13/2011      10/13/2041      N/A                      
            009/2011 IPCA      2 64.1 7,488,809.46 10/13/2011      10/13/2041      N/A                      
            010/2011 IPCA      3 65.4 17,799,809.24 10/13/2011      10/13/2041      N/A                      
            017/2011 IPCA      2 45.6 17,156,078.59 9/12/2011 9/12/2041 N/A                      
            005/2012 IPCA      4 41.6 26,964,661.95 10/5/2012 10/5/2042 N/A                      
            017/2012 IPCA      2 0.0 15,510,204.80 1/6/2012 1/6/2042 N/A                      
            018/2012 IPCA      6 209.6 22,605,476.90 1/6/2012 1/6/2042 N/A                      
            019/2012 IPCA      3 60.3 59,119,542.63 1/6/2012 1/6/2042 N/A                      

 

 

17 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

FURNAS             034/2001 IGPM      2 664.0 264,900,803.90 9/5/2001 9/5/2031 Mar-18 1-Jul-23    
            006/2005 IGPM      2 90.0 34,345,942.29 4/3/2005 4/3/2035 Jun-25    
            007/2006 IPCA      3 71.0 25,564,044.02 04/27/2006      04/27/2036      jan/28 and Jan/30    
            003/2009 IPCA      2 180.0 13,955,514.97 01/28/2009      01/28/2039      N/A                
            028/2009 IPCA      3 187.0 15,968,699.66 11/19/2009      11/18/2039      N/A                
            006/2010 IPCA      2 94.7 11,247,613.60 12/7/2010 12/7/2040 N/A                
            014/2011 IPCA      2 50.0 5,575,403.81 9/12/2011 9/12/2041 N/A                
            016/2012 IPCA      1 0.0 12,544,574.51 10/5/2012 10/5/2042 N/A                
ELETRONORTE             007/2008 IPCA      3 35.9 12,392,276.70 03/17/2008      03/17/2038      N/A             1-Jul-23    
            001/2009 IPCA      2 95.0 27,874,449.93 01/28/2009      01/28/2039      N/A                
            002/2009 IPCA      1 0.0 21,134,257.81 01/28/2009      01/28/2039      N/A                
            010/2009 IPCA      2 44.0 90,935,081.41 02/26/2009      02/26/2039      N/A                
            012/2009 IPCA      2 111.0 294,234,689.38 02/26/2009      02/26/2039      N/A                
            021/2009 IPCA      7 985.6 95,399,112.38 11/19/2009      11/19/2039      N/A                
            022/2009 IPCA      3 486.0 51,355,220.54 11/19/2009      11/19/2039      N/A                
            009/2010 IPCA      2 59.1 7,373,108.76 12/7/2010 12/7/2040 N/A                
            004/2011 IPCA      1 0.0 8,782,771.43 06/28/2011      06/28/2041      N/A                
            012/2011 IPCA      2 0.0 8,447,558.82 9/12/2011 9/12/2041 N/A                
            013/2011 IPCA      1 0.0 2,701,130.80 9/12/2011 9/12/2041 N/A                
            014/2012 IPCA      2 29.5 13,937,132.35 7/5/2012 7/5/2042 N/A                
CGT ELETROSUL               004/2004 IGPM      3 371.9 87,576,602.94 02/18/2004      02/18/2034      Nov-20 1-Jul-23    
            010/2005 IGPM      4 361.2 215,483,317.31 4/3/2005 4/3/2035 apr/23             
            005/2006 IPCA      2 257.4 55,720,738.20 04/27/2006      04/27/2036      may/24             
            004/2008 IPCA      2 238.0 7,879,547.69 03/17/2008      03/17/2038      N/A                
            005/2009 IPCA      1 0.0 6,619,027.13 01/28/2009      01/28/2039      N/A                
            011/2010 IPCA      4 0.0 26,621,394.87 6/10/2010 6/10/2040 N/A                
            012/2010 IPCA      2 36.6 5,177,199.01 6/10/2010 6/10/2040 N/A                
            002/2011 IPCA      3 231.3 13,349,278.87 06/16/2011      06/16/2041      N/A                
            004/2012 IPCA      5 783.1 90,380,953.89 9/5/2014 9/5/2042 N/A                
            020/2012 IPCA      4 473.2 150,747,041.85 8/27/2012 8/26/2042 N/A                
            007/2014 IPCA      5 273.5 28,073,376.75 01/29/2014      01/29/2044      N/A                
            008/2014 IPCA      1 0.0 4,367,998.88 01/29/2014      01/29/2044      N/A                
Total       8825.2                     2,284,552,865.67            
                       
Other contracts (*)
                       
Company Total Km                    
                   
CHESF 190.8                    
FURNAS 485.3                    
ELETRONORTE 424.6                    
CGT ELETROSUL   241.7                    
                       
Remarks                      
1. Substations may be associated with more than one contract.
2. There are RAPs that exceed the effective date of the contract and there is still no regulation of the form of payment, that is, via indemnity or contract extension. For verification of these RAPs, see the list of modules attached to Aneel's approval resolution for the current cycle, available on the Eletrobras website.
3. (**) Transmission lines associated with connection of power plants, free consumers, sectionings, etc., without revenue contract approved by REH 3067/2022
4. (***) RAP value considers part of the cycle with integral value and the rest of the cycle with a 50% reduction

 

 

18 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

Concessionária da Receita Edificação Módulo Classificação Função Transmissão Contrato da Receita Índice Tipo Receita Ato da RAP Início de Vigência Fim de Vigência RAP do Ciclo
CGT ELETROSUL ABDON BATISTA EL 500 kV ABDON BATISTA LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBNI REA 5904/2016 1/7/2016 30/06/2043 404,420.96
  ABDON BATISTA EL 500 kV ABDON BATISTA LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBNI REA 5904/2016 1/7/2016 30/06/2043 404,420.96
  ALEGRETE EL 69 kV ALEGRETE LT 69 kV HARMONIA /ALEGRETE C-1 RS DIT   057/2001 IPCA RMEL REN 643/2014 19/11/2013 18/11/2036 6,312.22
  ALEGRETE EL 69 kV ALEGRETE LT 69 kV HARMONIA /ALEGRETE C-2 RS DIT   057/2001 IPCA RMEL REN 643/2014 19/11/2013 18/11/2036 6,312.22
  ALEGRETE EL 138 kV ALEGRETE LT 138 kV SANTA MARIA 3 /ALEGRETE C-1 RS DIT   057/2001 IPCA RMEL REN 443/2011 16/11/2014 15/11/2037 12,689.68
  ALEGRETE TR 69/13,8 kV ALEGRETE TR3 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 20,437.54
  ALEGRETE TR 69/13,8 kV ALEGRETE TR4 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 20,437.54
  ALEGRETE MG 138 kV ALEGRETE MG1 RS DIT   057/2001 IPCA RCDM REA 5861/2016 31/05/2019 30/05/2036 31,034.83
  ALEGRETE IB 69 kV MG 138 kV ALEGRETE MG1 RS IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,603.88
  ALEGRETE MC 13,8 kV TR 69/13,8 kV ALEGRETE TR3 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 33,500.60
  ALEGRETE MC 13,8 kV TR 69/13,8 kV ALEGRETE TR4 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 33,500.60
  ALEGRETE EL 13,8 kV ALEGRETE  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 39,438.74
  ALEGRETE EL 13,8 kV ALEGRETE  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 39,438.74
  ALEGRETE EL 13,8 kV ALEGRETE  DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 39,438.74
  ALEGRETE EL 13,8 kV ALEGRETE  DIST4 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 39,438.74
  ALEGRETE MC 69 kV TR 138/69 kV ALEGRETE TR5 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  ALEGRETE MC 69 kV TR 138/69 kV ALEGRETE TR6 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  ALEGRETE MC 69 kV TR 69/13,8 kV ALEGRETE TR3 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  ALEGRETE MC 69 kV TR 69/13,8 kV ALEGRETE TR4 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  ALEGRETE MC 13,8 kV TR 69/13,8 kV ALEGRETE TR3 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2044 52,633.51
  ALEGRETE MC 13,8 kV TR 69/13,8 kV ALEGRETE TR4 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2044 52,633.51
  ALEGRETE EL 13,8 kV ALEGRETE  DIST1 DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2045 54,837.12
  ALEGRETE EL 13,8 kV ALEGRETE  DIST2 DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2045 54,837.12
  ALEGRETE EL 13,8 kV ALEGRETE  DIST3 DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2045 54,837.12
  ALEGRETE EL 13,8 kV ALEGRETE  DIST4 DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2045 54,837.12
  ALEGRETE EL 69 kV ALEGRETE LT 69 kV ALEGRETE 2 /ALEGRETE C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  ALEGRETE EL 69 kV ALEGRETE LT 69 kV HARMONIA /ALEGRETE C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  ALEGRETE EL 69 kV ALEGRETE LT 69 kV HARMONIA /ALEGRETE C-2 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  ALEGRETE EL 69 kV ALEGRETE LT 69 kV MACAMBARA /ALEGRETE C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  ALEGRETE MC 138 kV TR 138/69 kV ALEGRETE TR5 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 77,192.25
  ALEGRETE MC 138 kV TR 138/69 kV ALEGRETE TR6 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 77,192.25
  ALEGRETE EL 138 kV ALEGRETE LT 138 kV SANTA MARIA 3 /ALEGRETE C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,368.46
  ALEGRETE TR 138/69 kV ALEGRETE TR5 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 98,148.30
  ALEGRETE TR 138/69 kV ALEGRETE TR6 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 98,148.30
  ALEGRETE MG 138 kV ALEGRETE MG1 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2042 101,596.50
  ALEGRETE MG 138 kV ALEGRETE MG1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 285,829.24
  ALEGRETE MC 13,8 kV TR 69/13,8 kV ALEGRETE TF7 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2044 325,557.25
  ALEGRETE MC 69 kV TR 69/13,8 kV ALEGRETE TF7 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2044 326,177.49
  ALEGRETE TR 69/13,8 kV ALEGRETE TF7 RS DIT   057/2001 IPCA RCDM REA 3815/2012 24/12/2014 23/12/2047 477,875.40
  ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR2 MS RBF FT TR 230/138 kV ANASTACIO TR2 MS 057/2001 IPCA RMEL REN 643/2014 16/05/2016 15/05/2039 418.75
  ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RMEL REN 643/2014 16/05/2016 15/05/2039 2,615.93
  ANASTACIO MG 230 kV ANASTACIO MG1 MS RB FT MG 230 kV ANASTACIO MG1 MS 057/2001 IPCA RBNI REA 5861/2016 19/04/2018 18/04/2035 22,358.19
  ANASTACIO MC 138 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 75,397.57
  ANASTACIO MC 138 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,192.25
  ANASTACIO MC 138 kV TR 230/138 kV ANASTACIO TR2 MS RBF FT TR 230/138 kV ANASTACIO TR2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,192.25
  ANASTACIO IB 230 kV MG 230 kV ANASTACIO MG1 MS IB1 RB FT MG 230 kV ANASTACIO MG1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 112,593.49
  ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR2 MS RBF FT TR 230/138 kV ANASTACIO TR2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  ANASTACIO EL 230 kV ANASTACIO LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 159,968.93
  ANASTACIO EL 230 kV ANASTACIO LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  ANASTACIO MC 230 kV TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 177,569.12
  ANASTACIO TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 237,697.12
  ANASTACIO TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 243,354.99
  ANASTACIO TR 230/138 kV ANASTACIO TR2 MS RBF FT TR 230/138 kV ANASTACIO TR2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 243,354.99
  ANASTACIO EL 230 kV ANASTACIO LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 252,284.05
  ANASTACIO MG 230 kV ANASTACIO MG1 MS RB FT MG 230 kV ANASTACIO MG1 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 337,628.72
  ANASTACIO MG 230 kV ANASTACIO MG1 MS RB FT MG 230 kV ANASTACIO MG1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 345,665.25
  ANASTACIO TR 230/138 kV ANASTACIO TR1 MS RBF FT TR 230/138 kV ANASTACIO TR1 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 374,867.75
  ARAQUARI (HYOSUNG) EL 138 kV ARAQUARI (HYOSUNG) LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  ARAQUARI (HYOSUNG) EL 138 kV ARAQUARI (HYOSUNG) LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BATEIAS C-1 PR RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RMEL REN 643/2014 26/04/2015 25/04/2046 1,230.72
  AREIA EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RMEL REN 643/2014 29/12/2014 28/12/2046 1,727.73
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RMEL REN 643/2014 22/10/2014 21/10/2043 2,087.37
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-1 PR DIT   057/2001 IPCA RMEL REN 643/2014 29/03/2015 28/03/2047 2,530.14
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 29/12/2014 28/12/2043 2,536.49
  AREIA EL 500 kV AREIA LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 29/03/2015 28/03/2046 2,538.00
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RMEL REN 643/2014 4/7/2015 3/7/2047 2,548.56
  AREIA EL 500 kV AREIA LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RMEL REN 643/2014 1/9/2015 31/08/2046 2,568.56
  AREIA MC 500 kV TR 500/230 kV AREIA TR2 PR RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RMEL REN 643/2014 14/12/2014 13/12/2039 2,572.86
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 11/9/2015 10/9/2044 2,590.12
  AREIA EL 500 kV AREIA LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RMEL REN 643/2014 27/02/2016 26/02/2048 2,593.73
  AREIA EL 230 kV AREIA LT 230 kV AREIA /PONTA GROSSA C-1 PR RB FT LT 230 kV AREIA /PONTA GROSSA C-1 PR 057/2001 IPCA RMEL REN 643/2014 3/12/2015 2/12/2044 2,607.50
  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 643/2014 20/10/2014 19/10/2034 2,627.75
  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 643/2014 22/10/2014 21/10/2034 2,628.34
  AREIA IB 230 kV MG 500 kV AREIA MG2 PR IB1 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 443/2011 22/10/2014 21/10/2039 2,799.62
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BATEIAS C-1 PR RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-1 PR DIT   057/2001 IPCA RCDM REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RCDM REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  AREIA EL 500 kV AREIA LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  AREIA EL 500 kV AREIA LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  AREIA EL 500 kV AREIA LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  AREIA EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RMEL REN 643/2014 18/05/2014 17/05/2044 13,157.42
  AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RMEL REN 643/2014 18/05/2014 17/05/2044 13,157.42

 

 

19 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 643/2014 13/10/2014 12/10/2031 15,387.47
  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 643/2014 14/10/2014 13/10/2031 15,389.52
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 9/6/2013 8/6/2036 19,549.50
  AREIA EL 230 kV AREIA LT 230 kV AREIA /PONTA GROSSA C-1 PR RB FT LT 230 kV AREIA /PONTA GROSSA C-1 PR 057/2001 IPCA RMEL REN 643/2014 10/12/2013 9/12/2036 19,923.42
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 13/04/2014 12/4/2037 20,175.42
  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RMEL REN 643/2014 8/12/2013 7/12/2030 21,568.46
  AREIA EL 500 kV AREIA LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBNI REA 5484/2015 28/10/2015 27/10/2038 40,573.06
  AREIA MC 230 kV TR 230/138 kV AREIA TR3 PR RBF FT TR 230/138 kV AREIA TR3 PR 057/2001 IPCA RBNI REA 4347/2013 22/03/2015 21/03/2045 41,114.71
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBNI REA 5484/2015 18/08/2017 17/08/2047 43,999.61
  AREIA EL 500 kV AREIA LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBNI REA 5484/2015 28/10/2015 27/10/2043 70,627.14
  AREIA IB 230 kV MG 500 kV AREIA MG2 PR IB1 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 86,880.35
  AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 107,223.00
  AREIA MC 230 kV TR 230/138 kV AREIA TR3 PR RBF FT TR 230/138 kV AREIA TR3 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 107,223.00
  AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  AREIA MC 230 kV TR 230/138 kV AREIA TR3 PR RBF FT TR 230/138 kV AREIA TR3 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  AREIA MC 230 kV TR 500/230 kV AREIA TR2 PR RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBNI REA 6882/2018 30/03/2021 30/03/2046 124,278.00
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 155,829.33
  AREIA EL 230 kV AREIA LT 230 kV AREIA /PONTA GROSSA C-1 PR RB FT LT 230 kV AREIA /PONTA GROSSA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 169,099.43
  AREIA IB 230 kV MG 500 kV AREIA MG2 PR IB1 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBNI REA 6882/2018 30/03/2021 30/03/2036 169,833.49
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBNI REA 6882/2018 20/01/2021 20/01/2041 236,501.59
  AREIA MC 230 kV TR 230/138 kV AREIA TR1 PR RBF FT TR 230/138 kV AREIA TR1 PR 057/2001 IPCA RBNI REA 6882/2018 20/01/2021 20/01/2041 240,368.32
  AREIA MC 230 kV TR 230/138 kV AREIA TR3 PR RBF FT TR 230/138 kV AREIA TR3 PR 057/2001 IPCA RBNI REA 6882/2018 20/01/2021 20/01/2042 249,602.81
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RBNI REA 6882/2018 5/3/2021 5/3/2042 265,425.05
  AREIA EL 230 kV AREIA LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RBNI REA 6882/2018 25/01/2021 25/01/2042 265,425.17
  AREIA EL 230 kV AREIA LT 230 kV AREIA /PONTA GROSSA C-1 PR RB FT LT 230 kV AREIA /PONTA GROSSA C-1 PR 057/2001 IPCA RBNI REA 6882/2018 17/02/2021 17/02/2042 275,890.00
  AREIA MC 500 kV TR 500/230 kV AREIA TR2 PR RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  AREIA IB 500 kV MG 500 kV AREIA MG2 PR IB1 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  AREIA IB 500 kV MG 500 kV AREIA MG2 PR IB2 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  AREIA IB 500 kV MG 500 kV AREIA MG2 PR IB3 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  AREIA IB 500 kV MG 500 kV AREIA MG2 PR IB4 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  AREIA IB 500 kV MG 500 kV AREIA MG2 PR IB5 RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  AREIA EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,051.19
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BATEIAS C-1 PR RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-1 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  AREIA EL 500 kV AREIA LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  AREIA EL 500 kV AREIA LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  AREIA EL 500 kV AREIA LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  AREIA EL 500 kV AREIA LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  AREIA EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  AREIA MC 230 kV TR 500/230 kV AREIA TR2 PR RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RBNI REA 6882/2018 30/03/2021 30/03/2046 459,814.96
  AREIA TR 500/230 kV AREIA TRR1 PR RB FT TR 500/230 kV AREIA TRR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 483,714.95
  AREIA EL 500 kV AREIA LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 542,596.80
  AREIA TR 500/230 kV AREIA TR2 PR RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,417,406.50
  AREIA TR 500/230 kV AREIA TR2 PR RB FT TR 500/230 kV AREIA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  AREIA MG 500 kV AREIA MG2 PR RB FT MG 500 kV AREIA MG2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,490,954.41
  ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RMEL REN 643/2014 5/4/2016 4/4/2045 2,633.47
  ASSIS MC 230 kV TR 440/230 kV ASSIS TR1 SP RB FT TR 440/230 kV ASSIS TR1 SP 057/2001 IPCA RMEL REN 643/2014 20/10/2013 19/10/2036 19,753.44
  ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RMEL REN 443/2011 1/9/2016 31/08/2039 21,874.02
  ASSIS IB 230 kV MG 440 kV ASSIS MG1 SP IB1 RB FT MG 440 kV ASSIS MG2 SP 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2043 106,825.94
  ASSIS MC 230 kV TR 440/230 kV ASSIS TR1 SP RB FT TR 440/230 kV ASSIS TR1 SP 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 121,479.66
  ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 165,485.86
  ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 165,485.86
  ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  ASSIS EL 230 kV ASSIS LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  ASSIS MG 440 kV ASSIS MG2 SP RB FT MG 440 kV ASSIS MG2 SP 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,268.86
  ASSIS TR 440/230 kV ASSIS TRR1 SP RB FT TR 440/230 kV ASSIS TRR1 SP 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 371,782.39
  ASSIS TR 440/230 kV ASSIS TRR1 SP RB FT TR 440/230 kV ASSIS TRR1 SP 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 380,631.88
  ASSIS TR 440/230 kV ASSIS TR1 SP RB FT TR 440/230 kV ASSIS TR1 SP 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,115,347.18
  ASSIS TR 440/230 kV ASSIS TR1 SP RB FT TR 440/230 kV ASSIS TR1 SP 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,141,895.64
  ATLANTIDA 2 MG 230 kV ATLANTIDA 2 MG1 RS RB FT MG 230 kV ATLANTIDA 2 MG1 RS 057/2001 IPCA RBNI REA 5861/2016 2/5/2019 1/5/2036 7,063.21
  ATLANTIDA 2 MG 230 kV ATLANTIDA 2 MG1 RS RB FT MG 230 kV ATLANTIDA 2 MG1 RS 057/2001 IPCA RMEL REN 643/2014 6/10/2014 5/10/2031 25,304.24
  ATLANTIDA 2 IB 69 kV MG 230 kV ATLANTIDA 2 MG1 RS IB2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,603.88
  ATLANTIDA 2 MC 69 kV TR 230/69 kV ATLANTIDA 2 TR1 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  ATLANTIDA 2 MC 69 kV TR 230/69 kV ATLANTIDA 2 TR2 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  ATLANTIDA 2 MC 69 kV TR 230/69 kV ATLANTIDA 2 TR3 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  ATLANTIDA 2 EL 69 kV ATLANTIDA 2  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  ATLANTIDA 2 EL 69 kV ATLANTIDA 2  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  ATLANTIDA 2 EL 69 kV ATLANTIDA 2  DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  ATLANTIDA 2 EL 69 kV ATLANTIDA 2  DIST4 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  ATLANTIDA 2 IB 230 kV MG 230 kV ATLANTIDA 2 MG1 RS IB1 RB FT MG 230 kV ATLANTIDA 2 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  ATLANTIDA 2 MC 230 kV TR 230/69 kV ATLANTIDA 2 TR1 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  ATLANTIDA 2 MC 230 kV TR 230/69 kV ATLANTIDA 2 TR2 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  ATLANTIDA 2 MC 230 kV TR 230/69 kV ATLANTIDA 2 TR3 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  ATLANTIDA 2 EL 230 kV ATLANTIDA 2 LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS RB FT LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  ATLANTIDA 2 EL 230 kV ATLANTIDA 2 LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS RB FT LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  ATLANTIDA 2 TR 230/69 kV ATLANTIDA 2 TR1 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 243,597.20
  ATLANTIDA 2 TR 230/69 kV ATLANTIDA 2 TR2 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 243,597.20
  ATLANTIDA 2 TR 230/69 kV ATLANTIDA 2 TR3 RS RBF FT TR 230/69 kV ATLANTIDA 2 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 243,597.20
  ATLANTIDA 2 MG 230 kV ATLANTIDA 2 MG1 RS RB FT MG 230 kV ATLANTIDA 2 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 376,122.99
  BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI DSP 4033/2021 22/12/2021 21/12/2036 5,959.93

 

 

20 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI REA 5861/2016 11/10/2018 10/10/2035 26,864.21
  BIGUACU MC 230 kV TR 500/230 kV BIGUACU TRR1 SC RB FT TR 500/230 kV BIGUACU TRR1 SC 010/2005 IGPM RBNI REA 2383/2010 1/3/2012 28/02/2035 40,038.26
  BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI REA 6090/2016 28/09/2018 28/09/2049 68,453.45
  BIGUACU IB 138 kV MG 230 kV BIGUACU MG1 SC IB2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,841.03
  BIGUACU MG 500 kV BIGUACU MG1 SC RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 2383/2010 1/3/2012 28/02/2037 80,590.96
  BIGUACU MC 138 kV TR 230/138 kV BIGUACU TR2 SC RBF FT TR 230/138 kV BIGUACU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,437.14
  BIGUACU MC 138 kV TR 230/138 kV BIGUACU TR3 SC RBF FT TR 230/138 kV BIGUACU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,437.14
  BIGUACU MC 500 kV TR 500/230 kV BIGUACU TRR1 SC RB FT TR 500/230 kV BIGUACU TRR1 SC 010/2005 IGPM RBNI REA 2383/2010 1/3/2012 29/02/2040 95,900.84
  BIGUACU IB 230 kV MG 230 kV BIGUACU MG1 SC IB1 RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  BIGUACU MC 230 kV TR 230/138 kV BIGUACU TR2 SC RBF FT TR 230/138 kV BIGUACU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  BIGUACU MC 230 kV TR 230/138 kV BIGUACU TR3 SC RBF FT TR 230/138 kV BIGUACU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI REA 4618/2014 15/04/2016 14/04/2044 116,287.30
  BIGUACU EL 138 kV BIGUACU  TIJUC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  BIGUACU EL 138 kV BIGUACU LT 138 kV BIGUACU /B.Q.BOCAIUVA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  BIGUACU EL 138 kV BIGUACU LT 138 kV BIGUACU /FLORIANOPOLIS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  BIGUACU EL 138 kV BIGUACU LT 138 kV BIGUACU /FLORIANOPOLIS C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  BIGUACU EL 138 kV BIGUACU LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  BIGUACU EL 138 kV BIGUACU LT 138 kV BIGUACU /TIJUCAS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  BIGUACU EL 230 kV BIGUACU LT 230 kV BIGUACU /DESTERRO C-1 SC RB FT LT 230 kV BIGUACU /DESTERRO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  BIGUACU EL 230 kV BIGUACU LT 230 kV BIGUACU /GASPAR 2 C-1 SC RB FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  BIGUACU EL 230 kV BIGUACU LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  BIGUACU EL 230 kV BIGUACU LT 230 kV BIGUACU /PALHOCA ESU C-1 SC RB FT LT 230 kV BIGUACU /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI REA 4618/2014 15/04/2016 14/04/2044 183,239.69
  BIGUACU MG 500 kV BIGUACU MG1 SC RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2032 184,353.25
  BIGUACU MG 500 kV BIGUACU MG1 SC RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 4802/2014 19/02/2017 18/02/2046 214,967.26
  BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBNI REA 2589/2010 12/11/2012 11/11/2040 273,320.39
  BIGUACU TR 230/138 kV BIGUACU TR2 SC RBF FT TR 230/138 kV BIGUACU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  BIGUACU TR 230/138 kV BIGUACU TR3 SC RBF FT TR 230/138 kV BIGUACU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  BIGUACU MG 230 kV BIGUACU MG1 SC RB FT MG 230 kV BIGUACU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 435,224.11
  BIGUACU MC 230 kV BC 230 kV 0 Mvar BIGUACU BC1 SC RB FT BC 230 kV 100 Mvar BIGUACU BC1 SC 057/2001 IPCA RBNI REA 6090/2016 28/09/2018 28/09/2042 782,358.63
  BIGUACU MG 500 kV BIGUACU MG1 SC RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 5239/2015 25/05/2017 24/05/2047 793,132.14
  BIGUACU MC 230 kV TR 500/230 kV BIGUACU TR2 SC RB FT TR 500/230 kV BIGUACU TR2 SC 010/2005 IGPM RBNI REA 2383/2010 1/3/2012 28/02/2035 858,908.34
  BIGUACU MC 230 kV TR 500/230 kV BIGUACU TR1 SC RB FT TR 500/230 kV BIGUACU TR1 SC 010/2005 IGPM RBNI REA 485/2006 5/7/2008 4/7/2031 875,651.13
  BIGUACU RTB 525 kV 0 Mvar BIGUACU RTR1 SC RB FT RTB 500 kV 50 Mvar BIGUACU RTR1 SC 010/2005 IGPM RBNI REA 5239/2015 25/05/2017 24/05/2053 896,747.44
  BIGUACU MC 230 kV TR 230/138 kV BIGUACU TF7 SC RBF FT TR 230/138 kV BIGUACU TF7 SC 057/2001 IPCA RBNI REA 2589/2010 12/11/2012 11/11/2042 1,006,850.68
  BIGUACU MC 138 kV TR 230/138 kV BIGUACU TF7 SC RBF FT TR 230/138 kV BIGUACU TF7 SC 057/2001 IPCA RBNI REA 2589/2010 12/11/2012 11/11/2042 1,062,404.33
  BIGUACU BC 230 kV 0 Mvar BIGUACU BC1 SC RB FT BC 230 kV 100 Mvar BIGUACU BC1 SC 057/2001 IPCA RBNI REA 6090/2016 28/09/2018 28/09/2038 1,073,316.66
  BIGUACU MC 230 kV TR 230/138 kV BIGUACU TF8 SC RBF FT TR 230/138 kV BIGUACU TF8 SC 057/2001 IPCA RBNI REA 4618/2014 15/04/2016 14/04/2046 1,098,439.29
  BIGUACU MC 138 kV TR 230/138 kV BIGUACU TF8 SC RBF FT TR 230/138 kV BIGUACU TF8 SC 057/2001 IPCA RBNI REA 4618/2014 15/04/2016 14/04/2046 1,160,438.09
  BIGUACU MC 230 kV TR 525/230 kV BIGUACU TR3 SC RB FT TR 500/230 kV BIGUACU TR3 SC 010/2005 IGPM RBNI REA 4802/2014 19/02/2017 18/02/2048 1,471,104.66
  BIGUACU TR 230/138 kV BIGUACU TF7 SC RBF FT TR 230/138 kV BIGUACU TF7 SC 057/2001 IPCA RBNI REA 2589/2010 12/11/2012 11/11/2046 1,548,062.78
  BIGUACU MC 525 kV RTB 525 kV 0 Mvar BIGUACU RT2 SC RB FT RTB 500 kV 150 Mvar BIGUACU RT2 SC 010/2005 IGPM RBNI REA 5239/2015 25/05/2017 24/05/2048 1,589,690.86
  BIGUACU TR 230/138 kV BIGUACU TF8 SC RBF FT TR 230/138 kV BIGUACU TF8 SC 057/2001 IPCA RBNI REA 4618/2014 15/04/2016 14/04/2050 1,672,324.39
  BIGUACU IB 525 kV MG 500 kV BIGUACU MG1 SC IB4 RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 5239/2015 25/05/2017 24/05/2049 1,957,013.65
  BIGUACU MC 500 kV TR 500/230 kV BIGUACU TR2 SC RB FT TR 500/230 kV BIGUACU TR2 SC 010/2005 IGPM RBNI REA 2383/2010 1/3/2012 29/02/2040 2,189,747.79
  BIGUACU MC 500 kV TR 500/230 kV BIGUACU TR1 SC RB FT TR 500/230 kV BIGUACU TR1 SC 010/2005 IGPM RBNI REA 485/2006 5/7/2008 4/7/2036 2,234,738.07
  BIGUACU MC 500 kV RTB 500 kV 150 Mvar BIGUACU RT1 SC RB FT RTB 500 kV 150 Mvar BIGUACU RT1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2036 2,236,391.96
  BIGUACU IB 500 kV MG 500 kV BIGUACU MG1 SC IB1 RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2039 2,328,424.55
  BIGUACU IB 500 kV MG 500 kV BIGUACU MG1 SC IB2 RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2039 2,328,424.55
  BIGUACU IB 500 kV MG 500 kV BIGUACU MG1 SC IB3 RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2039 2,328,424.55
  BIGUACU MC 525 kV TR 525/230 kV BIGUACU TR3 SC RB FT TR 500/230 kV BIGUACU TR3 SC 010/2005 IGPM RBNI REA 4802/2014 19/02/2017 18/02/2048 2,384,716.78
  BIGUACU EL 500 kV BIGUACU LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2035 2,538,409.12
  BIGUACU EL 500 kV BIGUACU LT 500 kV BIGUACU /BLUMENAU C-1 SC RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2035 2,538,409.12
  BIGUACU RTB 525 kV 0 Mvar BIGUACU RT2 SC RB FT RTB 500 kV 150 Mvar BIGUACU RT2 SC 010/2005 IGPM RBNI REA 5239/2015 25/05/2017 24/05/2053 2,690,242.31
  BIGUACU TR 500/230 kV BIGUACU TRR1 SC RB FT TR 500/230 kV BIGUACU TRR1 SC 010/2005 IGPM RBNI REA 485/2006 5/7/2008 4/7/2043 3,323,839.82
  BIGUACU RTB 500 kV 150 Mvar BIGUACU RT1 SC RB FT RTB 500 kV 150 Mvar BIGUACU RT1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2044 3,989,064.09
  BIGUACU TR 525/230 kV BIGUACU TR3 SC RB FT TR 500/230 kV BIGUACU TR3 SC 010/2005 IGPM RBNI REA 4802/2014 19/02/2017 18/02/2052 6,322,811.70
  BIGUACU MG 500 kV BIGUACU MG1 SC RB FT MG 500 kV BIGUACU MG1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2032 6,648,856.65
  BIGUACU TR 500/230 kV BIGUACU TR2 SC RB FT TR 500/230 kV BIGUACU TR2 SC 010/2005 IGPM RBNI REA 2383/2010 1/3/2012 28/02/2047 9,675,430.85
  BIGUACU TR 500/230 kV BIGUACU TR1 SC RB FT TR 500/230 kV BIGUACU TR1 SC 010/2005 IGPM RBNI REA 485/2006 5/7/2008 4/7/2043 9,971,519.48
  BLUMENAU MC 230 kV BC 230 kV 125 Mvar BLUMENAU BC1 SC RB FT BC 230 kV 125 Mvar BLUMENAU BC1 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/6/2048 207.33
  BLUMENAU MC 230 kV BC 230 kV 125 Mvar BLUMENAU BC2 SC RB FT BC 230 kV 125 Mvar BLUMENAU BC2 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/6/2048 207.33
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /ITAJAI C-1 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-1 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2044 387.55
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /ITAJAI C-2 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-2 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2044 387.55
  BLUMENAU MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RMEL REN 643/2014 13/03/2016 12/3/2051 1,615.42
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2042 1,653.23
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2037 1,834.91
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2037 1,834.91
  BLUMENAU EL 500 kV BLUMENAU LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2045 1,948.21
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2042 2,175.31
  BLUMENAU EL 500 kV BLUMENAU LT 500 kV BIGUACU /BLUMENAU C-1 SC RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RMEL REN 643/2014 25/06/2014 24/06/2045 2,337.88
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2044 2,422.18
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2044 2,422.18
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RMEL REN 643/2014 1/12/2014 30/11/2044 2,453.49
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RMEL REN 443/2011 1/12/2014 30/11/2044 2,453.49
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/6/2037 2,479.43
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RMEL REN 643/2014 28/03/2016 27/03/2039 2,647.46
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RMEL REN 643/2014 28/09/2014 27/09/2044 13,300.48
  BLUMENAU RTB 500 kV 50 Mvar BLUMENAU RTR1 SC RB FT RTB 500 kV 50 Mvar BLUMENAU RTR1 SC 057/2001 IPCA RBNI REA 7151/2018 5/6/2020 5/6/2053 16,168.22
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2019 29/04/2049 18,256.59
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2019 29/04/2049 18,256.59
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RMEL REN 643/2014 14/08/2013 13/08/2036 19,683.62
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RMEL REN 643/2014 25/11/2013 24/11/2036 19,892.95
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2036 19,901.06
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2037 20,146.97
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RMEL REN 643/2014 26/08/2014 25/08/2037 20,449.76

 

 

21 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

  BLUMENAU EL 138 kV BLUMENAU LT 138 kV BLUMENAU /GASPAR C-1 SC DIT   057/2001 IPCA RCDM REA 7761/2019 18/08/2021 17/08/2051 21,485.61
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RMEL REN 643/2014 14/09/2016 13/09/2046 21,813.43
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RMEL REN 643/2014 14/09/2016 13/09/2046 21,813.43
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RMEL REN 443/2011 9/11/2016 8/11/2039 22,087.71
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBNI REA 3578/2012 26/07/2014 25/07/2044 40,331.20
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBNI REA 2837/2011 2/8/2014 1/8/2044 40,354.14
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBNI REA 3578/2012 3/8/2014 2/8/2044 40,357.43
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBNI REA 3578/2012 17/08/2014 16/08/2044 40,403.31
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBNI REA 3578/2012 23/08/2014 22/08/2044 40,422.99
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBNI REA 3578/2012 24/08/2014 23/08/2044 40,426.26
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBNI REA 3578/2012 30/08/2014 29/08/2044 40,445.93
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RMEL REN 643/2014 27/07/2014 26/07/2037 42,390.95
  BLUMENAU MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RMEL REN 643/2014 22/08/2014 21/08/2037 42,500.80
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RMEL REN 643/2014 23/04/2015 22/04/2038 43,531.74
  BLUMENAU IB 138 kV MG 500 kV BLUMENAU MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,120.84
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 82,328.77
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 82,328.77
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,288.43
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,288.43
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,288.43
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,288.43
  BLUMENAU IB 230 kV MG 500 kV BLUMENAU MG1 SC IB1 RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 86,880.35
  BLUMENAU IB 230 kV MG 500 kV BLUMENAU MG1 SC IB2 RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 86,880.35
  BLUMENAU MG 500 kV BLUMENAU MG1 SC RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBNI REA 7151/2018 5/6/2020 5/6/2043 88,616.45
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 107,223.00
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 107,223.00
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 107,223.00
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 107,223.00
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  BLUMENAU MC 230 kV BC 230 kV 125 Mvar BLUMENAU BC1 SC RB FT BC 230 kV 125 Mvar BLUMENAU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,065.81
  BLUMENAU MC 230 kV BC 230 kV 125 Mvar BLUMENAU BC2 SC RB FT BC 230 kV 125 Mvar BLUMENAU BC2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,065.81
  BLUMENAU EL 138 kV BLUMENAU LT 138 kV BLUMENAU /GASPAR C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  BLUMENAU EL 138 kV BLUMENAU LT 138 kV BLUMENAU /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  BLUMENAU EL 138 kV BLUMENAU LT 138 kV BLUMENAU DOIS /BLUMENAU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  BLUMENAU EL 138 kV BLUMENAU LT 138 kV BLUMENAU DOIS /BLUMENAU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 129,839.19
  BLUMENAU MC 138 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 129,839.19
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /ITAJAI C-1 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /ITAJAI C-2 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  BLUMENAU EL 230 kV BLUMENAU LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 169,099.43
  BLUMENAU MC 230 kV TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 169,099.43
  BLUMENAU MC 230 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 169,099.43
  BLUMENAU RTB 500 kV 50 Mvar BLUMENAU RTR1 SC RB FT RTB 500 kV 50 Mvar BLUMENAU RTR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 188,987.87
  BLUMENAU RTB 500 kV 50 Mvar BLUMENAU RTR1 SC RB FT RTB 500 kV 50 Mvar BLUMENAU RTR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,486.33
  BLUMENAU BC 230 kV 125 Mvar BLUMENAU BC1 SC RB FT BC 230 kV 125 Mvar BLUMENAU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,044.51
  BLUMENAU BC 230 kV 125 Mvar BLUMENAU BC2 SC RB FT BC 230 kV 125 Mvar BLUMENAU BC2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,044.51
  BLUMENAU MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 284,312.62
  BLUMENAU MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 291,080.08
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 303,656.99
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 303,656.99
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  BLUMENAU TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 319,522.13
  BLUMENAU TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 319,522.13
  BLUMENAU TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 319,522.13
  BLUMENAU TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  BLUMENAU TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  BLUMENAU TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  BLUMENAU IB 500 kV MG 500 kV BLUMENAU MG1 SC IB1 RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  BLUMENAU IB 500 kV MG 500 kV BLUMENAU MG1 SC IB2 RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  BLUMENAU TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 332,900.42
  BLUMENAU TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 340,824.40
  BLUMENAU EL 500 kV BLUMENAU LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  BLUMENAU MC 500 kV RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 448,384.20
  BLUMENAU MC 500 kV TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 478,891.85
  BLUMENAU TR 230/138 kV BLUMENAU TR1 SC RBF FT TR 230/138 kV BLUMENAU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 503,912.47
  BLUMENAU TR 230/138 kV BLUMENAU TR2 SC RBF FT TR 230/138 kV BLUMENAU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 503,912.47
  BLUMENAU TR 230/138 kV BLUMENAU TR3 SC RBF FT TR 230/138 kV BLUMENAU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 503,912.47
  BLUMENAU TR 230/138 kV BLUMENAU TR4 SC RBF FT TR 230/138 kV BLUMENAU TR4 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 525,011.12
  BLUMENAU RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 566,963.61
  BLUMENAU RTB 500 kV 150 Mvar BLUMENAU RT1 SC RB FT RTB 500 kV 150 Mvar BLUMENAU RT1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,458.98
  BLUMENAU MG 500 kV BLUMENAU MG1 SC RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,190,907.46
  BLUMENAU MG 500 kV BLUMENAU MG1 SC RB FT MG 500 kV BLUMENAU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,219,254.47
  BLUMENAU TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,417,406.50
  BLUMENAU TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,417,406.50
  BLUMENAU TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  BLUMENAU TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84

 

 

22 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  BLUMENAU MC 525 kV RTB 525 kV 0 Mvar BLUMENAU RT2 SC RB FT RTB 525 kV 150 Mvar BLUMENAU RT2 SC 057/2001 IPCA RBNI REA 7151/2018 5/6/2020 5/6/2048 1,700,590.36
  BLUMENAU TR 500/230 kV BLUMENAU TR5 SC RB FT TR 500/230 kV BLUMENAU TR5 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,235,365.70
  BLUMENAU TR 500/230 kV BLUMENAU TR6 SC RB FT TR 500/230 kV BLUMENAU TR6 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,235,365.70
  BLUMENAU MG 500 kV BLUMENAU MG2 SC RB FT MG 500 kV BLUMENAU MG2 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 4/3/2035 2,330,834.32
  BLUMENAU RTB 525 kV 0 Mvar BLUMENAU RT2 SC RB FT RTB 525 kV 150 Mvar BLUMENAU RT2 SC 057/2001 IPCA RBNI REA 7151/2018 5/6/2020 5/6/2055 3,046,043.95
  BLUMENAU EL 500 kV BLUMENAU LT 500 kV BIGUACU /BLUMENAU C-1 SC RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 4/3/2035 3,212,583.28
  BLUMENAU IB 500 kV MG 500 kV BLUMENAU MG2 SC IB4 RB FT MG 500 kV BLUMENAU MG2 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 4/3/2035 3,212,583.28
  BLUMENAU RTL 500 kV 150 Mvar BLUMENAU RT2 SC RB FT LT 500 kV BLUMENAU /C.NOVOS C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 4/3/2035 3,430,249.59
  C.MOURAO IB 230 kV MG 230 kV C.MOURAO MG1 PR IB1 RB FT MG 230 kV C.MOURAO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 86,880.35
  C.MOURAO MC 230 kV TR 230/138 kV C.MOURAO TR1 PR RBF FT TR 230/138 kV C.MOURAO TR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  C.MOURAO EL 230 kV C.MOURAO LT 230 kV C.MOURAO /APUCARANA C-1 PR RB FT LT 230 kV C.MOURAO /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  C.MOURAO EL 230 kV C.MOURAO LT 230 kV C.MOURAO /MARINGA C-1 PR RB FT LT 230 kV C.MOURAO /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  C.MOURAO EL 230 kV C.MOURAO LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  C.MOURAO EL 230 kV C.MOURAO LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  C.MOURAO MG 230 kV C.MOURAO MG1 PR RB FT MG 230 kV C.MOURAO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 326,758.45
  C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR7 SC RB FT TR 500/230 kV C.NOVOS TR7 SC 057/2001 IPCA RMEL REN 643/2014 15/09/2014 14/09/2042 205.92
  C.NOVOS RTL 500 kV 75 Mvar C.NOVOS RT4 SC RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RMEL REN 443/2011 13/06/2014 12/6/2047 336.80
  C.NOVOS EL 525 kV C.NOVOS LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RMEL REN 643/2014 13/06/2014 12/6/2045 361.65
  C.NOVOS RTL 500 kV 150 Mvar C.NOVOS RT3 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RMEL REN 643/2014 13/06/2014 12/6/2050 626.93
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 5/12/2014 4/12/2045 2,191.05
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/6/2034 2,588.57
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/6/2034 2,588.57
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/6/2034 2,588.57
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/6/2034 2,588.57
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBNI REA 5861/2016 31/05/2019 30/05/2033 2,722.95
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RMEL REN 443/2011 13/06/2014 12/6/2045 2,898.93
  C.NOVOS EL 525 kV C.NOVOS LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 10,783.68
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 443/2011 1/4/2015 31/03/2032 11,503.24
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 443/2011 1/4/2015 31/03/2032 11,503.24
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 443/2011 15/11/2015 14/11/2030 21,151.56
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RMEL REN 643/2014 13/08/2014 12/8/2031 30,524.42
  C.NOVOS MC 500 kV RTB 500 kV 100 Mvar C.NOVOS RT2 SC RB FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC 057/2001 IPCA RMEL REN 643/2014 31/01/2014 30/01/2037 41,643.08
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 643/2014 20/07/2014 19/07/2037 42,361.36
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RMEL REN 643/2014 2/9/2014 1/9/2037 42,547.27
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RMEL REN 443/2011 15/05/2016 14/05/2039 45,171.12
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RMEL REN 643/2014 1/2/2015 31/01/2045 58,090.59
  C.NOVOS IB 138 kV MG 500 kV C.NOVOS MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,120.84
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 643/2014 13/04/2014 12/4/2044 65,330.22
  C.NOVOS MC 138 kV TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,288.43
  C.NOVOS MC 138 kV TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,288.43
  C.NOVOS MC 138 kV TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,288.43
  C.NOVOS IB 230 kV MG 500 kV C.NOVOS MG1 SC IB1 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  C.NOVOS IB 230 kV MG 500 kV C.NOVOS MG1 SC IB1 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBNI REA 5484/2015 29/09/2017 28/09/2050 100,395.75
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBNI REA 5484/2015 29/09/2017 28/09/2050 100,395.75
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBNI REA 5484/2015 29/09/2017 28/09/2050 100,395.75
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBNI REA 5484/2015 29/09/2017 28/09/2050 100,395.75
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 112,593.49
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 112,593.49
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 112,593.49
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  C.NOVOS MC 230 kV TR 500/230 kV C.NOVOS TR1 SC RB FT TR 500/230 kV C.NOVOS TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  C.NOVOS MC 230 kV TR 500/230 kV C.NOVOS TR2 SC RB FT TR 500/230 kV C.NOVOS TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  C.NOVOS MC 230 kV TR 500/230 kV C.NOVOS TR7 SC RB FT TR 500/230 kV C.NOVOS TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 122,759.97
  C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 122,759.97
  C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  C.NOVOS MC 500 kV RTB 500 kV 100 Mvar C.NOVOS RT2 SC RB FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,762.22
  C.NOVOS RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC RB FT RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 164,615.11
  C.NOVOS RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC RB FT RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,533.42
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 177,569.12
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 177,569.12
  C.NOVOS MC 230 kV TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 177,569.12
  C.NOVOS MC 500 kV RTL 500 kV 100 Mvar C.NOVOS RT1 SC RB FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 188,347.73
  C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 193,602.49
  C.NOVOS EL 138 kV C.NOVOS LT 138 kV VIDAL R. JR /C.NOVOS C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 193,602.49
  C.NOVOS RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC RB FT RTB 500 kV 33,3 Mvar C.NOVOS RTR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 259,611.45
  C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR2 SC RB FT TR 500/230 kV C.NOVOS TR2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 303,656.99
  C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR1 SC RB FT TR 500/230 kV C.NOVOS TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR2 SC RB FT TR 500/230 kV C.NOVOS TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR7 SC RB FT TR 500/230 kV C.NOVOS TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  C.NOVOS TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 319,522.13
  C.NOVOS TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 319,522.13
  C.NOVOS TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 319,522.13
  C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB4 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,244.98
  C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB5 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,244.98
  C.NOVOS TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  C.NOVOS TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  C.NOVOS TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB1 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33

 

 

23 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB2 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB3 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB4 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  C.NOVOS IB 500 kV MG 500 kV C.NOVOS MG1 SC IB5 RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,051.19
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  C.NOVOS MC 500 kV TR 500/230 kV C.NOVOS TR2 SC RB FT TR 500/230 kV C.NOVOS TR2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 478,891.85
  C.NOVOS TR 500/230 kV C.NOVOS TRR1 SC RB FT TR 500/230 kV C.NOVOS TRR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 483,714.95
  C.NOVOS RTB 500 kV 100 Mvar C.NOVOS RT2 SC RB FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 494,025.30
  C.NOVOS RTL 500 kV 100 Mvar C.NOVOS RT1 SC RB FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 494,025.30
  C.NOVOS TR  230/138  kV C.NOVOS        TR3 SC RBF FT TR  230/138  kV C.NOVOS        TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 503,912.47
  C.NOVOS TR  230/138  kV C.NOVOS        TR4 SC RBF FT TR  230/138  kV C.NOVOS        TR4 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 503,912.47
  C.NOVOS TR  230/138  kV C.NOVOS        TR5 SC RBF FT TR  230/138  kV C.NOVOS        TR5 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 503,912.47
  C.NOVOS RTB 500 kV 100 Mvar C.NOVOS RT2 SC RB FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 505,784.52
  C.NOVOS RTL 500 kV 100 Mvar C.NOVOS RT1 SC RB FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 505,784.52
  C.NOVOS RTL 500 kV 25 Mvar C.NOVOS RTR1 SC RB FT RTL 500 kV 25 Mvar C.NOVOS RTR1 SC 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 539,718.51
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 542,596.80
  C.NOVOS MC 500 kV RTL 500 kV 75 Mvar C.NOVOS RT4 SC RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 632,820.80
  C.NOVOS RTB 500 kV 100 Mvar C.NOVOS RT2 SC RB FT RTB 500 kV 100 Mvar C.NOVOS RT2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 779,118.20
  C.NOVOS RTL 500 kV 100 Mvar C.NOVOS RT1 SC RB FT RTL 500 kV 100 Mvar C.NOVOS RT1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 779,118.20
  C.NOVOS TR 500/230 kV C.NOVOS TR1 SC RB FT TR 500/230 kV C.NOVOS TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  C.NOVOS TR 500/230 kV C.NOVOS TR2 SC RB FT TR 500/230 kV C.NOVOS TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  C.NOVOS TR 500/230 kV C.NOVOS TR7 SC RB FT TR 500/230 kV C.NOVOS TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  C.NOVOS MG 500 kV C.NOVOS MG1 SC RB FT MG 500 kV C.NOVOS MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,569,567.11
  C.NOVOS RTL 500 kV 75 Mvar C.NOVOS RT4 SC RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 1,619,152.74
  C.NOVOS EL 525 kV C.NOVOS LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 1,893,000.74
  C.NOVOS EL 500 kV C.NOVOS LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 4/3/2035 3,212,583.28
  C.NOVOS RTL 500 kV 150 Mvar C.NOVOS RT3 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 4/3/2035 3,430,249.59
  CAMAQUA 3 MG 230 kV CAMAQUA 3 MG1 RS RB FT MG 230 kV CAMAQUA 3 MG1 RS 004/2012 IPCA RBNI DSP 1430/2021 27/05/2021 26/05/2036 3,794.38
  CAMAQUA 3 MC 69 kV TR 230/69 kV CAMAQUA 3 TR1 RS RBF FT TR 230/69 kV CAMAQUA 3 TR1 RS 004/2012 IPCA RBL CC 004/2012 9/12/2014 10/5/2042 146,981.36
  CAMAQUA 3 MC 69 kV TR 230/69 kV CAMAQUA 3 TR2 RS RBF FT TR 230/69 kV CAMAQUA 3 TR2 RS 004/2012 IPCA RBL CC 004/2012 9/12/2014 10/5/2042 146,981.36
  CAMAQUA 3 IB 69 kV MG 230 kV CAMAQUA 3 MG1 RS IB1 DIT   004/2012 IPCA RPEC CC 004/2012 9/12/2014 10/5/2042 149,703.55
  CAMAQUA 3 EL 69 kV CAMAQUA 3  DIST1 DIT   004/2012 IPCA RPEC CC 004/2012 9/12/2014 10/5/2042 258,638.27
  CAMAQUA 3 EL 69 kV CAMAQUA 3  DIST2 DIT   004/2012 IPCA RPEC CC 004/2012 9/12/2014 10/5/2042 258,638.27
  CAMAQUA 3 EL 69 kV CAMAQUA 3  DIST3 DIT   004/2012 IPCA RPEC CC 004/2012 9/12/2014 10/5/2042 258,638.27
  CAMAQUA 3 IB 230 kV MG 230 kV CAMAQUA 3 MG1 RS IB1 RB FT MG 230 kV CAMAQUA 3 MG1 RS 004/2012 IPCA RBL CC 004/2012 9/12/2014 10/5/2042 313,276.79
  CAMAQUA 3 MC 230 kV TR 230/69 kV CAMAQUA 3 TR1 RS RBF FT TR 230/69 kV CAMAQUA 3 TR1 RS 004/2012 IPCA RBL CC 004/2012 9/12/2014 10/5/2042 360,548.29
  CAMAQUA 3 MC 230 kV TR 230/69 kV CAMAQUA 3 TR2 RS RBF FT TR 230/69 kV CAMAQUA 3 TR2 RS 004/2012 IPCA RBL CC 004/2012 9/12/2014 10/5/2042 360,548.29
  CAMAQUA 3 EL 230 kV CAMAQUA 3 LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS RB FT LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS 004/2012 IPCA RBL CC 004/2012 9/12/2014 10/5/2042 507,785.06
  CAMAQUA 3 EL 230 kV CAMAQUA 3 LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS RB FT LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS 004/2012 IPCA RBL CC 004/2012 9/12/2014 10/5/2042 507,785.06
  CAMAQUA 3 MG 230 kV CAMAQUA 3 MG1 RS RB FT MG 230 kV CAMAQUA 3 MG1 RS 004/2012 IPCA RBL CC 004/2012 9/12/2014 10/5/2042 810,231.50
  CAMAQUA 3 TR 230/69 kV CAMAQUA 3 TR1 RS RBF FT TR 230/69 kV CAMAQUA 3 TR1 RS 004/2012 IPCA RBL CC 004/2012 9/12/2014 10/5/2042 849,223.26
  CAMAQUA 3 TR 230/69 kV CAMAQUA 3 TR2 RS RBF FT TR 230/69 kV CAMAQUA 3 TR2 RS 004/2012 IPCA RBL CC 004/2012 9/12/2014 10/5/2042 849,223.26
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RMEL REN 643/2014 29/08/2013 28/08/2036 12,192.48
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RMEL REN 643/2014 29/08/2013 28/08/2036 12,192.48
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-1 MS DIT   057/2001 IPCA RMEL REN 643/2014 9/12/2013 8/12/2036 12,320.69
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-2 MS DIT   057/2001 IPCA RMEL REN 643/2014 9/12/2013 8/12/2036 12,320.69
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /SIDROLANDIA C-1 MS DIT   057/2001 IPCA RMEL REN 643/2014 9/12/2013 8/12/2036 12,320.69
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RMEL REN 643/2014 9/12/2013 8/12/2036 12,320.69
  CAMPO GRANDE MG 138 kV CAMPO GRANDE MG1 MS DIT   057/2001 IPCA RMEL REN 643/2014 14/02/2013 13/02/2030 21,451.85
  CAMPO GRANDE IB 138 kV MG 138 kV CAMPO GRANDE MG1 MS IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,841.03
  CAMPO GRANDE MC 138 kV BC 138 kV 30 MVAr CAMPO GRANDE BC1 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 85,464.91
  CAMPO GRANDE MC 138 kV BC 138 kV 30 MVAr CAMPO GRANDE BC1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,499.22
  CAMPO GRANDE BC 138 kV 30 MVAr CAMPO GRANDE BC1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 107,084.21
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /SIDROLANDIA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 129,603.15
  CAMPO GRANDE EL 138 kV CAMPO GRANDE  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,688.07
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV A.GUARIROBA /CAMPO GRANDE C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,688.07
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,688.07
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /CG M.COUTO C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,688.07
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /SIDROLANDIA C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,688.07
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,688.07
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,688.07
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,688.07
  CAMPO GRANDE EL 138 kV CAMPO GRANDE LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,688.07
  CAMPO GRANDE MC 138 kV BC 138 kV 30 MVAr CAMPO GRANDE BC1 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 134,785.13
  CAMPO GRANDE MG 138 kV CAMPO GRANDE MG1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 272,821.18
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RMEL REN 643/2014 22/11/2015 21/11/2045 2,421.61
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR2 SC RBF FT TR 230/138 kV CANOINHAS ESU TR2 SC 057/2001 IPCA RMEL REN 643/2014 23/11/2015 22/11/2045 2,421.80
  CANOINHAS ESU MG 230 kV CANOINHAS ESU MG1 SC RB FT MG 230 kV CANOINHAS ESU MG1 SC 057/2001 IPCA RBNI REA 6630/2017 7/8/2017 6/8/2045 46,642.23
  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 75,397.57
  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 75,397.57
  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,192.25
  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR2 SC RBF FT TR 230/138 kV CANOINHAS ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,192.25
  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,192.25
  CANOINHAS ESU IB 230 kV MG 230 kV CANOINHAS ESU MG1 SC IB1 RB FT MG 230 kV CANOINHAS ESU MG1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 84,860.42
  CANOINHAS ESU IB 230 kV MG 230 kV CANOINHAS ESU MG1 SC IB1 RB FT MG 230 kV CANOINHAS ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 86,880.35
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 107,223.00
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 107,223.00
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR2 SC RBF FT TR 230/138 kV CANOINHAS ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 118,908.12
  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 118,908.12
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBNI REA 4892/2014 3/12/2017 2/12/2044 128,404.15

 

 

24 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  CANOINHAS ESU MC 138 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBNI REA 4892/2014 3/12/2017 2/12/2045 146,103.69
  CANOINHAS ESU EL 230 kV CANOINHAS ESU LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR RB FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 155,829.33
  CANOINHAS ESU EL 230 kV CANOINHAS ESU LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR RB FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 169,099.43
  CANOINHAS ESU MC 230 kV TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 169,099.43
  CANOINHAS ESU MG 230 kV CANOINHAS ESU MG1 SC RB FT MG 230 kV CANOINHAS ESU MG1 SC 057/2001 IPCA RBNI REA 4802/2014 22/08/2016 21/08/2044 184,888.92
  CANOINHAS ESU TR 230/138 kV CANOINHAS ESU TR1 SC RBF FT TR 230/138 kV CANOINHAS ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  CANOINHAS ESU TR 230/138 kV CANOINHAS ESU TR2 SC RBF FT TR 230/138 kV CANOINHAS ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  CANOINHAS ESU MG 230 kV CANOINHAS ESU MG1 SC RB FT MG 230 kV CANOINHAS ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,506.66
  CANOINHAS ESU BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC RB FT BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC 057/2001 IPCA RBNI REA 4802/2014 22/08/2016 21/08/2039 378,282.93
  CANOINHAS ESU MC 230 kV BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC RB FT BC 230 kV 50 Mvar CANOINHAS ESU BC1 SC 057/2001 IPCA RBNI REA 4802/2014 22/08/2016 21/08/2046 1,029,432.67
  CANOINHAS ESU TR 230/138 kV CANOINHAS ESU TR3 SC RBF FT TR 230/138 kV CANOINHAS ESU TR3 SC 057/2001 IPCA RBNI REA 4892/2014 3/12/2017 2/12/2051 1,848,235.90
  CASCAVEL OEST EL 500 kV CASCAVEL OEST LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034 4,991,685.55
  CAXIAS EL 230 kV CAXIAS LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RMEL REN 643/2014 11/1/2016 10/1/2045 152.40
  CAXIAS MC 525 kV TR 525/230 kV CAXIAS TR3 RS RB FT TR 525/230 kV CAXIAS TR3 RS 057/2001 IPCA RMEL REN 643/2014 9/4/2016 8/4/2049 238.00
  CAXIAS MC 525 kV RTB 525 kV 150 Mvar CAXIAS RT1 RS RB FT RTB 525 kV 150 Mvar CAXIAS RT1 RS 057/2001 IPCA RMEL REN 643/2014 25/01/2016 24/01/2049 340.90
  CAXIAS MG 525 kV CAXIAS MG1 RS RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBNI REA 5861/2016 3/6/2019 2/6/2036 21,085.39
  CAXIAS MC 525 kV TR 525/230 kV CAXIAS TR2 RS RB FT TR 525/230 kV CAXIAS TR2 RS 057/2001 IPCA RMEL REN 643/2014 25/11/2015 24/11/2038 45,597.99
  CAXIAS IB 230 kV MG 525 kV CAXIAS MG1 RS IB1 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  CAXIAS EL 525 kV CAXIAS LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBNI REA 8314/2019 12/6/2019 11/6/2034 108,273.14
  CAXIAS MC 230 kV TR 525/230 kV CAXIAS TR1 RS RB FT TR 525/230 kV CAXIAS TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  CAXIAS MC 230 kV TR 525/230 kV CAXIAS TR2 RS RB FT TR 525/230 kV CAXIAS TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  CAXIAS MC 230 kV TR 525/230 kV CAXIAS TR3 RS RB FT TR 525/230 kV CAXIAS TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  CAXIAS EL 230 kV CAXIAS LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  CAXIAS RTB 525 kV 50 Mvar CAXIAS RTR1 RS RB FT RTB 525 kV 50 Mvar CAXIAS RTR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,486.33
  CAXIAS MC 525 kV RTB 525 kV 150 Mvar CAXIAS RT1 RS RB FT RTB 525 kV 150 Mvar CAXIAS RT1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 291,080.08
  CAXIAS MC 525 kV TR 525/230 kV CAXIAS TR1 RS RB FT TR 525/230 kV CAXIAS TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  CAXIAS MC 525 kV TR 525/230 kV CAXIAS TR2 RS RB FT TR 525/230 kV CAXIAS TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  CAXIAS MC 525 kV TR 525/230 kV CAXIAS TR3 RS RB FT TR 525/230 kV CAXIAS TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  CAXIAS IB 525 kV MG 525 kV CAXIAS MG1 RS IB1 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  CAXIAS IB 525 kV MG 525 kV CAXIAS MG1 RS IB2 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  CAXIAS IB 525 kV MG 525 kV CAXIAS MG1 RS IB3 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  CAXIAS IB 525 kV MG 525 kV CAXIAS MG1 RS IB4 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  CAXIAS EL 525 kV CAXIAS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  CAXIAS EL 525 kV CAXIAS LT 500 kV CAXIAS /ITA C-1 RS/SC RB FT LT 500 kV CAXIAS /ITA C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  CAXIAS EL 525 kV CAXIAS LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  CAXIAS TR 525/230 kV CAXIAS TRR1 RS RB FT TR 525/230 kV CAXIAS TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 483,714.95
  CAXIAS RTB 525 kV 150 Mvar CAXIAS RT1 RS RB FT RTB 525 kV 150 Mvar CAXIAS RT1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,458.98
  CAXIAS RTB 525 kV 50,00 Mvar CAXIAS RTR2 RS RB FT RTB 525 kV 50 Mvar CAXIAS RTR2 RS 057/2001 IPCA RBNI REA 8795/2020 8/5/2022 8/5/2056 592,173.05
  CAXIAS MG 525 kV CAXIAS MG1 RS RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBNI REA 8795/2020 8/5/2022 8/5/2053 666,249.68
  CAXIAS MG 525 kV CAXIAS MG1 RS RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,304,776.73
  CAXIAS MC 525 kV RTB 525 kV 150,00 Mvar CAXIAS RT2 RS RB FT RTB 525 kV 150 Mvar CAXIAS RT2 RS 057/2001 IPCA RBNI REA 8795/2020 8/5/2022 8/5/2050 1,382,812.33
  CAXIAS TR 525/230 kV CAXIAS TR1 RS RB FT TR 525/230 kV CAXIAS TR1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,417,406.50
  CAXIAS TR 525/230 kV CAXIAS TR1 RS RB FT TR 525/230 kV CAXIAS TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  CAXIAS TR 525/230 kV CAXIAS TR2 RS RB FT TR 525/230 kV CAXIAS TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  CAXIAS TR 525/230 kV CAXIAS TR3 RS RB FT TR 525/230 kV CAXIAS TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  CAXIAS IB 525 kV MG 525 kV CAXIAS MG1 RS IB5 RB FT MG 525 kV CAXIAS MG1 RS 057/2001 IPCA RBNI REA 8795/2020 8/5/2022 8/5/2053 1,580,454.10
  CAXIAS RTB 525 kV 150,00 Mvar CAXIAS RT2 RS RB FT RTB 525 kV 150 Mvar CAXIAS RT2 RS 057/2001 IPCA RBNI REA 8795/2020 8/5/2022 8/5/2056 1,776,519.18
  CAXIAS TR 525/230 kV CAXIAS TR1 RS RB FT TR 525/230 kV CAXIAS TR1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,235,365.70
  CAXIAS SUL 5 BC 13,8 kV 3,6 MVAr CAXIAS SUL 5 BC1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,307.55
  CAXIAS SUL 5 BC 13,8 kV 3,6 MVAr CAXIAS SUL 5 BC2 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,307.55
  CAXIAS SUL 5 BC 13,8 kV 3,6 MVAr CAXIAS SUL 5 BC3 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,307.55
  CAXIAS SUL 5 BC 13,8 kV 3,6 MVAr CAXIAS SUL 5 BC4 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,307.55
  CAXIAS SUL 5 IB 13,8 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,023.06
  CAXIAS SUL 5 IB 13,8 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB4 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,023.06
  CAXIAS SUL 5 IB 69 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,603.88
  CAXIAS SUL 5 MG 230 kV CAXIAS SUL 5 MG1 RS RB FT MG 230 kV CAXIAS SUL 5 MG1 RS 057/2001 IPCA RBNI REA 5861/2016 15/05/2019 14/05/2036 31,921.90
  CAXIAS SUL 5 MC 13,8 kV TR 230/13,8 kV CAXIAS SUL 5 TR2 RS RBF FT TR 230/13,8 kV CAXIAS SUL 5 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 36,358.71
  CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5  DIST10 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 39,438.74
  CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5  DIST4 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 39,438.74
  CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5  DIST5 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 39,438.74
  CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5  DIST6 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 39,438.74
  CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5  DIST7 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 39,438.74
  CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5  DIST8 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 39,438.74
  CAXIAS SUL 5 EL 13,8 kV CAXIAS SUL 5  DIST9 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 39,438.74
  CAXIAS SUL 5 MC 69 kV TR 230/69 kV CAXIAS SUL 5 TR3 RS RBF FT TR 230/69 kV CAXIAS SUL 5 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  CAXIAS SUL 5 EL 69 kV CAXIAS SUL 5  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  CAXIAS SUL 5 EL 69 kV CAXIAS SUL 5  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  CAXIAS SUL 5 EL 69 kV CAXIAS SUL 5  DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  CAXIAS SUL 5 IB 230 kV MG 230 kV CAXIAS SUL 5 MG1 RS IB1 RB FT MG 230 kV CAXIAS SUL 5 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  CAXIAS SUL 5 MC 230 kV TR 230/13,8 kV CAXIAS SUL 5 TR2 RS RBF FT TR 230/13,8 kV CAXIAS SUL 5 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  CAXIAS SUL 5 MC 230 kV TR 230/69 kV CAXIAS SUL 5 TR3 RS RBF FT TR 230/69 kV CAXIAS SUL 5 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  CAXIAS SUL 5 TR 230/69 kV CAXIAS SUL 5 TRR1 RS RBF FT TR 230/69 kV CAXIAS SUL 5 TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 156,075.79
  CAXIAS SUL 5 EL 230 kV CAXIAS SUL 5 LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  CAXIAS SUL 5 EL 230 kV CAXIAS SUL 5 LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  CAXIAS SUL 5 EL 230 kV CAXIAS SUL 5 LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  CAXIAS SUL 5 TR 230/13,8 kV CAXIAS SUL 5 TR2 RS RBF FT TR 230/13,8 kV CAXIAS SUL 5 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 185,406.68
  CAXIAS SUL 5 MG 230 kV CAXIAS SUL 5 MG1 RS RB FT MG 230 kV CAXIAS SUL 5 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 413,495.20
  CAXIAS SUL 5 TR 230/69 kV CAXIAS SUL 5 TR3 RS RBF FT TR 230/69 kV CAXIAS SUL 5 TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 468,227.38
  CAXIAS SUL 6 IB 69 kV MG 230 kV CAXIAS SUL 6 MG1 RS IB1 DIT   011/2010 IPCA RPEC CC 011/2010 6/10/2010 6/10/2040 75,608.94
  CAXIAS SUL 6 EL 69 kV CAXIAS SUL 6  DIST1 DIT   011/2010 IPCA RPEC CC 011/2010 6/10/2010 6/10/2040 132,298.10
  CAXIAS SUL 6 EL 69 kV CAXIAS SUL 6  DIST2 DIT   011/2010 IPCA RPEC CC 011/2010 6/10/2010 6/10/2040 132,298.10
  CAXIAS SUL 6 MC 69 kV TR 230/69 kV CAXIAS SUL 6 TR1 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TR1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 6/10/2040 145,515.93
  CAXIAS SUL 6 MC 69 kV TR 230/69 kV CAXIAS SUL 6 TR2 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TR2 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 6/10/2040 145,515.93
  CAXIAS SUL 6 IB 230 kV MG 230 kV CAXIAS SUL 6 MG1 RS IB1 RB FT MG 230 kV CAXIAS SUL 6 MG1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 6/10/2040 270,102.22
  CAXIAS SUL 6 MC 230 kV TR 230/69 kV CAXIAS SUL 6 TR1 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TR1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 6/10/2040 365,890.77

 

25 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  CAXIAS SUL 6 MC 230 kV TR 230/69 kV CAXIAS SUL 6 TR2 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TR2 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 6/10/2040 365,890.77
  CAXIAS SUL 6 TR 230/69 kV CAXIAS SUL 6 TRR1 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TRR1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 6/10/2040 478,366.15
  CAXIAS SUL 6 MG 230 kV CAXIAS SUL 6 MG1 RS RB FT MG 230 kV CAXIAS SUL 6 MG1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 6/10/2040 1,120,240.24
  CAXIAS SUL 6 TR 230/69 kV CAXIAS SUL 6 TR1 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TR1 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 6/10/2040 1,435,098.46
  CAXIAS SUL 6 TR 230/69 kV CAXIAS SUL 6 TR2 RS RBF FT TR 230/69 kV CAXIAS SUL 6 TR2 RS 011/2010 IPCA RBL CC 011/2010 29/05/2013 6/10/2040 1,435,098.46
  CHARQUEADAS IB 69 kV MG 230 kV CHARQUEADAS MG1 RS IB2 DIT   057/2001 IPCA RMEL REN 643/2014 28/07/2014 27/07/2044 7,537.25
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RMEL REN 643/2014 26/11/2015 25/11/2045 7,834.96
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-2 RS DIT   057/2001 IPCA RMEL REN 643/2014 10/12/2015 9/12/2045 7,843.53
  CHARQUEADAS MG 230 kV CHARQUEADAS MG1 RS RB FT MG 230 kV CHARQUEADAS MG1 RS 057/2001 IPCA RMEL REN 643/2014 30/05/2014 29/05/2031 11,285.09
  CHARQUEADAS MG 230 kV CHARQUEADAS MG1 RS RB FT MG 230 kV CHARQUEADAS MG1 RS 057/2001 IPCA RMEL REN 643/2014 12/9/2014 11/9/2031 11,446.14
  CHARQUEADAS MG 230 kV CHARQUEADAS MG1 RS RB FT MG 230 kV CHARQUEADAS MG1 RS 057/2001 IPCA RMEL REN 643/2014 6/11/2014 5/11/2031 11,530.50
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-2 RS DIT   057/2001 IPCA RMEL REN 643/2014 28/07/2014 27/07/2044 15,074.52
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RMEL REN 643/2014 10/12/2015 9/12/2045 15,687.08
  CHARQUEADAS EL 230 kV CHARQUEADAS LT 230 kV C.INDUSTRIAL /CHARQUEADAS C-1 RS RB FT LT 230 kV C.INDUSTRIAL /CHARQUEADAS C-1 RS 057/2001 IPCA RMEL REN 443/2011 16/03/2013 15/03/2036 19,376.77
  CHARQUEADAS MC 230 kV TR 230/69 kV CHARQUEADAS TR5 RS RBF FT TR 230/69 kV CHARQUEADAS TR5 RS 057/2001 IPCA RMEL REN 643/2014 18/12/2013 17/12/2036 19,939.69
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV GUAIBA /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RMEL REN 643/2014 28/07/2014 27/07/2044 22,611.77
  CHARQUEADAS IB 69 kV MG 230 kV CHARQUEADAS MG1 RS IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,603.88
  CHARQUEADAS IB 69 kV MG 230 kV CHARQUEADAS MG1 RS IB2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,603.88
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV GUAIBA /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RMEL REN 643/2014 11/10/2014 10/10/2047 42,427.19
  CHARQUEADAS MC 69 kV TR 230/69 kV CHARQUEADAS TR5 RS RBF FT TR 230/69 kV CHARQUEADAS TR5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 53,693.63
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV TRIUNFO /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 53,693.63
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV ACOS FINOS PI /CHARQUEADAS C-2 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV GUAIBA /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV SAO JERONIMO /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV TAQUARI /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV TRIUNFO /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  CHARQUEADAS EL 69 kV CHARQUEADAS LT 69 kV CHARQUEADAS 2 /CHARQUEADAS C-1 RS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 84,679.23
  CHARQUEADAS IB 230 kV MG 230 kV CHARQUEADAS MG1 RS IB1 RB FT MG 230 kV CHARQUEADAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  CHARQUEADAS MC 230 kV TR 230/69 kV CHARQUEADAS TR5 RS RBF FT TR 230/69 kV CHARQUEADAS TR5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 102,861.29
  CHARQUEADAS EL 230 kV CHARQUEADAS LT 230 kV C.INDUSTRIAL /CHARQUEADAS C-1 RS RB FT LT 230 kV C.INDUSTRIAL /CHARQUEADAS C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  CHARQUEADAS EL 230 kV CHARQUEADAS LT 230 kV CHARQUEADAS /SANTA CRUZ 1 C-1 RS RB FT LT 230 kV CHARQUEADAS /SANTA CRUZ 1 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  CHARQUEADAS EL 230 kV CHARQUEADAS LT 230 kV SCHARLAU /CHARQUEADAS C-1 RS RB FT LT 230 kV SCHARLAU /CHARQUEADAS C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  CHARQUEADAS TR 230/69 kV CHARQUEADAS TR5 RS RBF FT TR 230/69 kV CHARQUEADAS TR5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,313.47
  CHARQUEADAS MG 230 kV CHARQUEADAS MG1 RS RB FT MG 230 kV CHARQUEADAS MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 410,799.90
  CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RMEL REN 643/2014 10/6/2014 9/6/2047 2,468.99
  CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RMEL REN 643/2014 19/06/2014 18/06/2047 2,470.66
  CURITIBA EL 500 kV CURITIBA LT 500 kV CURITIBA /BATEIAS C-1 PR RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RMEL REN 643/2014 21/09/2014 20/09/2045 2,500.96
  CURITIBA EL 500 kV CURITIBA LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RMEL REN 643/2014 4/4/2015 3/4/2046 2,539.17
  CURITIBA EL 500 kV CURITIBA LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RMEL REN 643/2014 9/5/2015 8/5/2046 2,546.03
  CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RMEL REN 643/2014 6/3/2016 5/3/2036 2,780.53
  CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RMEL REN 643/2014 13/03/2016 12/3/2036 2,782.65
  CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBNI REA 5861/2016 24/08/2018 23/08/2033 9,431.56
  CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RMEL REN 443/2011 14/11/2015 13/11/2032 11,844.00
  CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RMEL REN 443/2011 14/11/2015 13/11/2032 11,844.00
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2019 29/04/2049 18,256.59
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2019 29/04/2049 18,256.59
  CURITIBA TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RMEL REN 443/2011 2/7/2015 1/7/2045 19,597.58
  CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RMEL REN 643/2014 12/10/2013 11/10/2036 19,803.52
  CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RMEL REN 643/2014 10/11/2013 9/11/2036 19,862.45
  CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RMEL REN 643/2014 22/08/2013 21/08/2036 40,958.60
  CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RMEL REN 643/2014 1/9/2013 31/08/2036 41,000.86
  CURITIBA MC 500 kV RTL 500 kV 150 Mvar CURITIBA RT2 PR RB FT RTL 500 kV 150 Mvar CURITIBA RT2 PR 057/2001 IPCA RMEL REN 643/2014 17/12/2013 16/12/2036 41,452.95
  CURITIBA TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RMEL REN 443/2011 26/09/2015 25/09/2043 46,555.31
  CURITIBA TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RMEL REN 443/2011 25/10/2015 24/10/2043 46,653.71
  CURITIBA EL 500 kV CURITIBA LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBNI REA 5484/2015 28/10/2015 27/10/2043 55,691.57
  CURITIBA IB 230 kV MG 500 kV CURITIBA MG1 PR IB1 RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 86,880.35
  CURITIBA EL 500 kV CURITIBA LT 500 kV CURITIBA /BATEIAS C-1 PR RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RBNI DSP 386/2021 9/12/2021 8/12/2051 94,302.94
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBNI REA 4347/2013 30/11/2015 29/11/2048 95,788.96
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBNI REA 4347/2013 30/11/2015 29/11/2048 95,788.96
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBNI REA 4347/2013 30/11/2015 29/11/2048 95,788.96
  CURITIBA IB 230 kV MG 500 kV CURITIBA MG1 PR IB1 RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBNI REA 4347/2013 30/11/2015 29/11/2048 95,788.96
  CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,322.55
  CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,322.55
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 155,829.33
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  CURITIBA EL 230 kV CURITIBA LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RBNI REA 8314/2019 11/11/2020 10/11/2053 181,611.21
  CURITIBA MC 230 kV TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RBNI REA 8314/2019 27/11/2020 26/11/2053 181,733.26
  CURITIBA MC 500 kV RTL 500 kV 150 Mvar CURITIBA RT2 PR RB FT RTL 500 kV 150 Mvar CURITIBA RT2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 188,347.73
  CURITIBA RTB 500 kV 50 Mvar CURITIBA RTR2 PR RB FT RTB 500 kV 50 Mvar CURITIBA RTR2 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 188,987.87
  CURITIBA RTB 500 kV 50 Mvar CURITIBA RTR2 PR RB FT RTB 500 kV 50 Mvar CURITIBA RTR2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,486.33
  CURITIBA MC 500 kV RTB 500 kV 150 Mvar CURITIBA RT1 PR RB FT RTB 500 kV 150 Mvar CURITIBA RT1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 291,080.08
  CURITIBA RTB 500 kV 50 Mvar CURITIBA RTR2 PR RB FT RTB 500 kV 50 Mvar CURITIBA RTR2 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 298,049.29
  CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  CURITIBA MC 500 kV TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  CURITIBA IB 500 kV MG 500 kV CURITIBA MG1 PR IB1 RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  CURITIBA IB 500 kV MG 500 kV CURITIBA MG1 PR IB2 RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  CURITIBA IB 500 kV MG 500 kV CURITIBA MG1 PR IB3 RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  CURITIBA EL 500 kV CURITIBA LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  CURITIBA EL 500 kV CURITIBA LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  CURITIBA EL 500 kV CURITIBA LT 500 kV CURITIBA /BATEIAS C-1 PR RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  CURITIBA TR 500/230 kV CURITIBA TRR1 PR RB FT TR 500/230 kV CURITIBA TRR1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 472,468.83

 

26 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  CURITIBA TR 500/230 kV CURITIBA TRR1 PR RB FT TR 500/230 kV CURITIBA TRR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 483,714.95
  CURITIBA RTB 500 kV 150 Mvar CURITIBA RT1 PR RB FT RTB 500 kV 150 Mvar CURITIBA RT1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 566,963.61
  CURITIBA RTL 500 kV 150 Mvar CURITIBA RT2 PR RB FT RTL 500 kV 150 Mvar CURITIBA RT2 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 566,963.61
  CURITIBA RTB 500 kV 150 Mvar CURITIBA RT1 PR RB FT RTB 500 kV 150 Mvar CURITIBA RT1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,458.98
  CURITIBA RTL 500 kV 150 Mvar CURITIBA RT2 PR RB FT RTL 500 kV 150 Mvar CURITIBA RT2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,458.98
  CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RMEL REN 643/2014 1/12/2013 30/11/2028 794,510.39
  CURITIBA RTL 500 kV 150 Mvar CURITIBA RT2 PR RB FT RTL 500 kV 150 Mvar CURITIBA RT2 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 894,147.88
  CURITIBA MG 500 kV CURITIBA MG1 PR RB FT MG 500 kV CURITIBA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,244,826.87
  CURITIBA TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,417,406.50
  CURITIBA TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,417,406.50
  CURITIBA TR 500/230 kV CURITIBA TR1 PR RB FT TR 500/230 kV CURITIBA TR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  CURITIBA TR 500/230 kV CURITIBA TR2 PR RB FT TR 500/230 kV CURITIBA TR2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  D.SANTA CRUZ EL 138 kV D.SANTA CRUZ LT 138 kV DOURADOS /D.SANTA CRUZ C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  DESTERRO IB 138 kV MG 230 kV DESTERRO MG1 SC IB2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,841.03
  DESTERRO MC 138 kV TR 230/138 kV DESTERRO TR1 SC RBF FT TR 230/138 kV DESTERRO TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,437.14
  DESTERRO IB 230 kV MG 230 kV DESTERRO MG1 SC IB1 RB FT MG 230 kV DESTERRO MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  DESTERRO MC 230 kV TR 230/138 kV DESTERRO TR1 SC RBF FT TR 230/138 kV DESTERRO TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  DESTERRO MG 230 kV DESTERRO MG1 SC RB FT MG 230 kV DESTERRO MG1 SC 057/2001 IPCA RBNI REA 4802/2014 29/07/2016 28/07/2044 117,146.28
  DESTERRO EL 138 kV DESTERRO  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  DESTERRO EL 138 kV DESTERRO  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  DESTERRO EL 230 kV DESTERRO LT 230 kV BIGUACU /DESTERRO C-1 SC RB FT LT 230 kV BIGUACU /DESTERRO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  DESTERRO MG 230 kV DESTERRO MG1 SC RB FT MG 230 kV DESTERRO MG1 SC 057/2001 IPCA RBNI REA 4802/2014 29/07/2016 28/07/2044 184,582.09
  DESTERRO MG 230 kV DESTERRO MG1 SC RB FT MG 230 kV DESTERRO MG1 SC 057/2001 IPCA RBNI REA 7529/2018 23/12/2020 23/12/2051 195,922.21
  DESTERRO TR 230/138 kV DESTERRO TR1 SC RBF FT TR 230/138 kV DESTERRO TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  DESTERRO MG 230 kV DESTERRO MG1 SC RB FT MG 230 kV DESTERRO MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 347,858.47
  DESTERRO MC 230 kV RTB 230 kV 0 Mvar DESTERRO RB2 SC RB FT RTB 230 kV 50 Mvar DESTERRO RB2 SC 057/2001 IPCA RBNI REA 7529/2018 23/12/2020 23/12/2043 738,895.01
  DESTERRO MC 230 kV RTB 230 kV 50 Mvar DESTERRO RB1 SC RB FT RTB 230 kV 50 Mvar DESTERRO RB1 SC 057/2001 IPCA RBNI REA 7529/2018 23/12/2020 23/12/2043 738,895.01
  DESTERRO MC 138 kV TR 230/138 kV DESTERRO ATF2 SC RBF FT TR 230/138 kV DESTERRO ATF2 SC 057/2001 IPCA RBNI REA 4802/2014 29/07/2016 28/07/2046 872,641.80
  DESTERRO RTB 230 kV 0 Mvar DESTERRO RB1 SC RB FT RTB 230 kV 50 Mvar DESTERRO RB1 SC 057/2001 IPCA RBNI REA 7529/2018 23/12/2020 23/12/2055 968,448.68
  DESTERRO RTB 230 kV 0 Mvar DESTERRO RB2 SC RB FT RTB 230 kV 50 Mvar DESTERRO RB2 SC 057/2001 IPCA RBNI REA 7529/2018 23/12/2020 23/12/2055 968,448.68
  DESTERRO MC 230 kV TR 230/138 kV DESTERRO ATF2 SC RBF FT TR 230/138 kV DESTERRO ATF2 SC 057/2001 IPCA RBNI REA 4802/2014 29/07/2016 28/07/2046 1,081,266.67
  DESTERRO TR 230/138 kV DESTERRO ATF2 SC RBF FT TR 230/138 kV DESTERRO ATF2 SC 057/2001 IPCA RBNI REA 4802/2014 29/07/2016 28/07/2050 1,682,762.36
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR2 MS RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RMEL REN 643/2014 19/08/2012 18/08/2035 516.10
  DOURADOS EL 230 kV DOURADOS LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RMEL REN 643/2014 18/08/2012 17/08/2041 1,705.86
  DOURADOS MG 230 kV DOURADOS MG1 MS RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RMEL REN 643/2014 22/03/2013 21/03/2030 10,669.47
  DOURADOS MG 230 kV DOURADOS MG1 MS RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RMEL REN 643/2014 17/10/2013 16/10/2030 10,991.56
  DOURADOS EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036 16,052.69
  DOURADOS MC 230 kV RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036 16,052.69
  DOURADOS MC 230 kV RTL 230 kV 27 Mvar DOURADOS RT2 MS RB FT RTL 230 kV 27 Mvar DOURADOS RT2 MS 057/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036 16,052.69
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR3 MS RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036 16,052.69
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR4 MS RBF FT TR 230/138 kV DOURADOS TR4 MS 057/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036 16,052.69
  DOURADOS EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBNI REA 5744/2016 2/5/2018 2/5/2033 27,266.05
  DOURADOS MC 230 kV RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBNI REA 5744/2016 2/5/2018 2/5/2033 27,266.05
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR4 MS RBF FT TR 230/138 kV DOURADOS TR4 MS 057/2001 IPCA RBNI REA 5744/2016 2/5/2018 2/5/2033 27,266.05
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR5 MS RBF FT TR 230/138 kV DOURADOS TR5 MS 057/2001 IPCA RBNI REA 5744/2016 2/5/2018 2/5/2033 27,266.05
  DOURADOS MG 230 kV DOURADOS MG1 MS RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RBNI REA 5744/2016 2/5/2018 2/5/2042 58,927.23
  DOURADOS MC 230 kV RTL 230 kV 27 Mvar DOURADOS RT2 MS RB FT RTL 230 kV 27 Mvar DOURADOS RT2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,897.83
  DOURADOS MC 138 kV TR 230/138 kV DOURADOS TR2 MS RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,192.25
  DOURADOS MC 138 kV TR 230/138 kV DOURADOS TR3 MS RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,192.25
  DOURADOS MC 138 kV TR 230/138 kV DOURADOS TR4 MS RBF FT TR 230/138 kV DOURADOS TR4 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,192.25
  DOURADOS MC 138 kV TR 230/138 kV DOURADOS TR5 MS RBF FT TR 230/138 kV DOURADOS TR5 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,192.25
  DOURADOS IB 230 kV MG 230 kV DOURADOS MG1 MS IB1 RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  DOURADOS MC 230 kV RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 110,851.26
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR2 MS RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR3 MS RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR4 MS RBF FT TR 230/138 kV DOURADOS TR4 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  DOURADOS MC 230 kV TR 230/138 kV DOURADOS TR5 MS RBF FT TR 230/138 kV DOURADOS TR5 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  DOURADOS MG 230 kV DOURADOS MG1 MS RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RBNI REA 5744/2016 2/5/2018 2/5/2050 116,007.66
  DOURADOS IB 230 kV MG 230 kV DOURADOS MG1 MS IB1 RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RBNI REA 5744/2016 2/5/2018 2/5/2039 125,491.05
  DOURADOS TR 230/138 kV DOURADOS TRR1 MS RBF FT TR 230/138 kV DOURADOS TRR1 MS 057/2001 IPCA RBNI REA 5969/2016 7/8/2017 6/8/2044 136,001.74
  DOURADOS EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 159,968.93
  DOURADOS EL 230 kV DOURADOS LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 159,968.93
  DOURADOS EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  DOURADOS EL 230 kV DOURADOS LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  DOURADOS RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 166,231.44
  DOURADOS RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,188.22
  DOURADOS TR 230/138 kV DOURADOS TR2 MS RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 237,697.12
  DOURADOS TR 230/138 kV DOURADOS TR3 MS RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 237,697.12
  DOURADOS TR 230/138 kV DOURADOS TR5 MS RBF FT TR 230/138 kV DOURADOS TR5 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 237,697.12
  DOURADOS TR 230/138 kV DOURADOS TR2 MS RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 243,354.99
  DOURADOS TR 230/138 kV DOURADOS TR3 MS RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 243,354.99
  DOURADOS TR 230/138 kV DOURADOS TR4 MS RBF FT TR 230/138 kV DOURADOS TR4 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 243,354.99
  DOURADOS TR 230/138 kV DOURADOS TR5 MS RBF FT TR 230/138 kV DOURADOS TR5 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 243,354.99
  DOURADOS RTL 230 kV 27 Mvar DOURADOS RT2 MS RB FT RTL 230 kV 27 Mvar DOURADOS RT2 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 251,047.16
  DOURADOS EL 230 kV DOURADOS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 252,284.05
  DOURADOS RTL 230 kV 27 Mvar DOURADOS RT2 MS RB FT RTL 230 kV 27 Mvar DOURADOS RT2 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 257,022.80
  DOURADOS RTB 230 kV 27 Mvar DOURADOS RT1 MS RB FT RTB 230 kV 27 Mvar DOURADOS RT1 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 262,160.54
  DOURADOS TR 230/138 kV DOURADOS TR2 MS RBF FT TR 230/138 kV DOURADOS TR2 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 374,867.75
  DOURADOS TR 230/138 kV DOURADOS TR3 MS RBF FT TR 230/138 kV DOURADOS TR3 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 374,867.75
  DOURADOS RTL 230 kV 27 Mvar DOURADOS RT2 MS RB FT RTL 230 kV 27 Mvar DOURADOS RT2 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 395,921.85
  DOURADOS MG 230 kV DOURADOS MG1 MS RB FT MG 230 kV DOURADOS MG1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,837.66
  DOURADOS MC 230 kV BC 230 kV 0 Mvar DOURADOS BC1 MS RB FT BC 230 kV 50 Mvar DOURADOS BC1 MS 057/2001 IPCA RBNI REA 5744/2016 2/5/2018 2/5/2041 678,610.93
  DOURADOS MC 230 kV BC 230 kV 0 Mvar DOURADOS BC2 MS RB FT BC 230 kV 50 Mvar DOURADOS BC2 MS 057/2001 IPCA RBNI REA 5744/2016 2/5/2018 2/5/2041 678,610.93
  DOURADOS TR 230/138 kV DOURADOS TRR1 MS RBF FT TR 230/138 kV DOURADOS TRR1 MS 057/2001 IPCA RBNI REA 5969/2016 7/8/2017 31/12/2042 760,877.93
  DOURADOS BC 230 kV 0 Mvar DOURADOS BC1 MS RB FT BC 230 kV 50 Mvar DOURADOS BC1 MS 057/2001 IPCA RBNI REA 5744/2016 2/5/2018 2/5/2038 784,459.62
  DOURADOS BC 230 kV 0 Mvar DOURADOS BC2 MS RB FT BC 230 kV 50 Mvar DOURADOS BC2 MS 057/2001 IPCA RBNI REA 5744/2016 2/5/2018 2/5/2038 784,459.62

 

27 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  FARROUPILHA TR 230/69 kV FARROUPILHA TR1 RS RBF FT TR 230/69 kV FARROUPILHA TR1 RS 057/2001 IPCA RMEL REN 643/2014 18/10/2015 17/10/2048 2,560.12
  FARROUPILHA MG 230 kV FARROUPILHA MG1 RS RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBNI REA 6688/2017 28/06/2020 28/06/2050 3,791.25
  FARROUPILHA MG 230 kV FARROUPILHA MG1 RS RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBNI REA 6688/2017 28/06/2020 28/06/2050 7,683.32
  FARROUPILHA MG 230 kV FARROUPILHA MG1 RS RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBNI REA 5861/2016 20/12/2018 19/12/2033 9,533.29
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS RB FT LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS 057/2001 IPCA RMEL REN 643/2014 20/10/2013 19/10/2036 19,819.79
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV CAXIAS /FARROUPILHA C-2 RS RB FT LT 230 kV CAXIAS /FARROUPILHA C-2 RS 057/2001 IPCA RMEL REN 643/2014 2/2/2014 1/2/2037 20,033.17
  FARROUPILHA MC 69 kV TR 230/69 kV FARROUPILHA TR1 RS RBF FT TR 230/69 kV FARROUPILHA TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 42,119.29
  FARROUPILHA MC 69 kV TR 230/69 kV FARROUPILHA TR2 RS RBF FT TR 230/69 kV FARROUPILHA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 42,119.29
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RBNI REA 5484/2015 25/09/2017 24/09/2047 44,124.19
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS 057/2001 IPCA RBNI REA 5484/2015 25/09/2017 24/09/2047 44,124.19
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS RB FT LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS 057/2001 IPCA RBNI REA 5484/2015 25/09/2017 24/09/2047 44,124.19
  FARROUPILHA EL 69 kV FARROUPILHA LT 69 kV FARROUPILHA 1 /FARROUPILHA C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,978.51
  FARROUPILHA EL 69 kV FARROUPILHA LT 69 kV FARROUPILHA 1 /FARROUPILHA C-2 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,978.51
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV CAXIAS SUL 2 /FARROUPILHA C-1 RS RB FT LT 230 kV CAXIAS SUL 2 /FARROUPILHA C-1 RS 057/2001 IPCA RBNI REA 7761/2019 9/8/2021 8/8/2051 59,036.14
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBNI REA 9599/2021 9/5/2021 8/5/2054 76,318.99
  FARROUPILHA IB 230 kV MG 230 kV FARROUPILHA MG1 RS IB1 RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS 057/2001 IPCA RBNI REA 5484/2015 28/09/2017 27/09/2050 100,388.85
  FARROUPILHA MC 230 kV TR 230/69 kV FARROUPILHA TR1 RS RBF FT TR 230/69 kV FARROUPILHA TR1 RS 057/2001 IPCA RBNI REA 5484/2015 28/09/2017 27/09/2050 100,388.85
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RBNI REA 5484/2015 28/09/2017 27/09/2050 110,068.32
  FARROUPILHA MC 230 kV TR 230/69 kV FARROUPILHA TR2 RS RBF FT TR 230/69 kV FARROUPILHA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 121,479.66
  FARROUPILHA MG 230 kV FARROUPILHA MG1 RS RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBNI REA 6688/2017 28/06/2020 28/06/2050 147,276.09
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV CAXIAS /FARROUPILHA C-1 RS RB FT LT 230 kV CAXIAS /FARROUPILHA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV CAXIAS /FARROUPILHA C-2 RS RB FT LT 230 kV CAXIAS /FARROUPILHA C-2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV CAXIAS SUL 2 /FARROUPILHA C-1 RS RB FT LT 230 kV CAXIAS SUL 2 /FARROUPILHA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV FARROUPILHA /SCHARLAU C-1 RS RB FT LT 230 kV FARROUPILHA /SCHARLAU C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  FARROUPILHA EL 230 kV FARROUPILHA LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS RB FT LT 230 kV GARIBALDI 1 /FARROUPILHA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  FARROUPILHA TR 230/69 kV FARROUPILHA TR1 RS RBF FT TR 230/69 kV FARROUPILHA TR1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 244,493.82
  FARROUPILHA TR 230/69 kV FARROUPILHA TR2 RS RBF FT TR 230/69 kV FARROUPILHA TR2 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 244,493.82
  FARROUPILHA TR 230/69 kV FARROUPILHA TR1 RS RBF FT TR 230/69 kV FARROUPILHA TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,313.47
  FARROUPILHA TR 230/69 kV FARROUPILHA TR2 RS RBF FT TR 230/69 kV FARROUPILHA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,313.47
  FARROUPILHA MG 230 kV FARROUPILHA MG1 RS RB FT MG 230 kV FARROUPILHA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 424,220.77
  FARROUPILHA MC 230 kV TR 230/69 kV FARROUPILHA TR3 RS RBF FT TR 230/69 kV FARROUPILHA TR3 RS 057/2001 IPCA RBNI REA 6688/2017 3/7/2020 3/7/2044 729,114.47
  FARROUPILHA MC 69 kV TR 230/69 kV FARROUPILHA TR3 RS RBF FT TR 230/69 kV FARROUPILHA TR3 RS 057/2001 IPCA RBNI REA 6688/2017 3/7/2020 3/7/2042 1,225,296.43
  FARROUPILHA TR 230/69 kV FARROUPILHA TR3 RS RBF FT TR 230/69 kV FARROUPILHA TR3 RS 057/2001 IPCA RBNI REA 6688/2017 3/7/2020 3/7/2054 1,305,993.52
  FLORIANOPOLIS MG 138 kV FLORIANOPOLIS MG1 SC DIT   057/2001 IPCA RCDM DSP 4033/2021 22/12/2021 21/12/2036 5,959.93
  FLORIANOPOLIS EL 69 kV FLORIANOPOLIS  DIST2 DIT   057/2001 IPCA RMEL REN 443/2011 29/04/2014 28/04/2037 6,416.12
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RMEL REN 443/2011 26/04/2014 25/04/2037 12,434.51
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV BIGUACU /FLORIANOPOLIS C-1 SC DIT   057/2001 IPCA RMEL REN 443/2011 27/04/2014 26/04/2037 12,435.77
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV BIGUACU /FLORIANOPOLIS C-2 SC DIT   057/2001 IPCA RMEL REN 443/2011 27/04/2014 26/04/2037 12,435.77
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RCDM REA 3578/2012 19/04/2018 18/04/2048 22,439.61
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RCDM REA 3578/2012 19/04/2018 18/04/2048 22,439.61
  FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR1 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048 28,519.96
  FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR2 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048 28,519.96
  FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR3 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048 28,519.96
  FLORIANOPOLIS MC 69 kV TR 138/69 kV FLORIANOPOLIS TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,119.29
  FLORIANOPOLIS MC 69 kV TR 138/69 kV FLORIANOPOLIS TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,119.29
  FLORIANOPOLIS MC 69 kV TR 138/69 kV FLORIANOPOLIS TR3 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,119.29
  FLORIANOPOLIS EL 69 kV FLORIANOPOLIS  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,978.51
  FLORIANOPOLIS EL 69 kV FLORIANOPOLIS  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,978.51
  FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,022.18
  FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,022.18
  FLORIANOPOLIS MC 138 kV TR 138/69 kV FLORIANOPOLIS TR3 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,022.18
  FLORIANOPOLIS TR 138/69 kV FLORIANOPOLIS TR3 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 95,866.40
  FLORIANOPOLIS TR 138/69 kV FLORIANOPOLIS TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 98,148.30
  FLORIANOPOLIS TR 138/69 kV FLORIANOPOLIS TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 98,148.30
  FLORIANOPOLIS TR 138/69 kV FLORIANOPOLIS TR3 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 98,148.30
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV BIGUACU /FLORIANOPOLIS C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 122,932.01
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV BIGUACU /FLORIANOPOLIS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV BIGUACU /FLORIANOPOLIS C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  FLORIANOPOLIS EL 138 kV FLORIANOPOLIS LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  FLORIANOPOLIS MG 138 kV FLORIANOPOLIS MG1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 270,937.79
  FORQUILHINHA EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS RB FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS 057/2001 IPCA RMEL REN 643/2014 27/07/2014 26/07/2043 26.80
  FORQUILHINHA EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RMEL REN 643/2014 19/10/2014 18/10/2043 26.98
  FORQUILHINHA EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 5861/2016 29/04/2019 28/04/2036 11,059.04
  FORQUILHINHA EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS RB FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  FORQUILHINHA EL 230 kV FORQUILHINHA LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG1 RS RB FT MG 230 kV FOZ DO CHAPECO MG1 RS 002/2011 IPCA RBNI REA 6427/2017 1/7/2017 27/10/2047 43,696.74
  FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG2 RS RB FT MG 230 kV FOZ DO CHAPECO MG2 RS 002/2011 IPCA RBNI REA 6454/2017 1/7/2017 15/06/2040 53,973.77
  FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG1 RS RB FT MG 230 kV FOZ DO CHAPECO MG1 RS 002/2011 IPCA RBNI REN 443/2011 29/04/2015 28/04/2046 75,569.19
  FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG1 RS RB FT MG 230 kV FOZ DO CHAPECO MG1 RS 002/2011 IPCA RBNI REA 8795/2020 6/5/2022 6/5/2053 94,367.95
  FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG1 RS RB FT MG 230 kV FOZ DO CHAPECO MG1 RS 002/2011 IPCA RBNI REA 4056/2013 15/05/2015 15/05/2047 100,709.60
  FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG1 RS RB FT MG 230 kV FOZ DO CHAPECO MG1 RS 002/2011 IPCA RBNI REA 8795/2020 6/5/2022 6/5/2053 134,958.65
  FOZ DO CHAPECO EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS RB FT LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS 002/2011 IPCA RBNI REA 6427/2017 1/7/2017 27/10/2040 168,699.56
  FOZ DO CHAPECO EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC 002/2011 IPCA RBNI REA 6454/2017 1/7/2017 15/06/2047 169,121.70
  FOZ DO CHAPECO EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC 002/2011 IPCA RBNI REA 6454/2017 1/7/2017 15/06/2047 169,121.70
  FOZ DO CHAPECO IB 138 kV MG 230 kV FOZ DO CHAPECO MG1 RS IB1 DIT   002/2011 IPCA RPEC CC 002/2011 16/06/2011 16/06/2041 171,724.96
  FOZ DO CHAPECO MC 138 kV TR 230/138 kV FOZ DO CHAPECO TR1 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR1 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041 244,732.38
  FOZ DO CHAPECO MC 138 kV TR 230/138 kV FOZ DO CHAPECO TR2 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR2 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041 244,732.38
  FOZ DO CHAPECO MC 230 kV TR 230/138 kV FOZ DO CHAPECO TR1 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR1 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041 321,370.06
  FOZ DO CHAPECO MC 230 kV TR 230/138 kV FOZ DO CHAPECO TR2 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR2 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041 321,370.06
  FOZ DO CHAPECO EL 138 kV FOZ DO CHAPECO  PLANALTO DIT   002/2011 IPCA RPEC CC 002/2011 16/06/2011 16/06/2041 336,332.79
  FOZ DO CHAPECO MC 138 kV TR 230/138 kV FOZ DO CHAPECO TR3 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR3 RS 002/2011 IPCA RBNI REA 4056/2013 15/05/2015 15/05/2037 495,836.44

 

28 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  FOZ DO CHAPECO EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 604,454.71
  FOZ DO CHAPECO EL 230 kV FOZ DO CHAPECO LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 604,454.71
  FOZ DO CHAPECO MC 230 kV TR 230/138 kV FOZ DO CHAPECO TR3 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR3 RS 002/2011 IPCA RBNI REA 4056/2013 15/05/2015 15/05/2039 627,635.27
  FOZ DO CHAPECO MG 230 kV FOZ DO CHAPECO MG2 RS RB FT MG 230 kV FOZ DO CHAPECO MG2 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041 685,179.11
  FOZ DO CHAPECO MC 138 kV TR 230/138 kV FOZ DO CHAPECO TR4 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR4 RS 002/2011 IPCA RBNI REA 8795/2020 6/5/2022 6/5/2048 705,687.05
  FOZ DO CHAPECO TR 230/138 kV FOZ DO CHAPECO TR1 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR1 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041 720,110.95
  FOZ DO CHAPECO TR 230/138 kV FOZ DO CHAPECO TR2 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR2 RS 002/2011 IPCA RBL CC 002/2011 21/02/2013 16/06/2041 720,110.95
  FOZ DO CHAPECO EL 138 kV FOZ DO CHAPECO  CHAPECO 2 DIT   002/2011 IPCA RCDM REN 443/2011 29/04/2015 28/04/2037 787,786.82
  FOZ DO CHAPECO TR 230/138 kV FOZ DO CHAPECO TR4 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR4 RS 002/2011 IPCA RBNI REA 8795/2020 6/5/2022 6/5/2056 878,522.89
  FOZ DO CHAPECO MC 230 kV TR 230/138 kV FOZ DO CHAPECO TR4 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR4 RS 002/2011 IPCA RBNI REA 8795/2020 6/5/2022 6/5/2049 882,371.98
  FOZ DO CHAPECO TR 230/138 kV FOZ DO CHAPECO TR3 RS RBF FT TR 230/138 kV FOZ DO CHAPECO TR3 RS 002/2011 IPCA RBNI REA 4056/2013 15/05/2015 15/05/2050 913,233.90
  GARIBALDI 1 EL 230 kV GARIBALDI 1 LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS RB FT LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS 012/2010 IPCA RBL CC 012/2010 19/07/2013 6/10/2040 726,933.83
  GASPAR 2 EL 230 kV GASPAR 2 LT 230 kV BIGUACU /GASPAR 2 C-1 SC RB FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC 057/2001 IPCA RBNI REA 7009/2018 1/7/2018 22/01/2040 123,692.10
  GASPAR 2 EL 230 kV GASPAR 2 LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RBNI REA 7009/2018 1/7/2018 22/01/2040 123,692.10
  GASPAR 2 MG 230 kV GASPAR 2 MG2 SC RB FT MG 230 kV GASPAR 2 MG2 SC 057/2001 IPCA RBNI REA 4802/2014 30/09/2016 29/09/2043 517,669.55
  GASPAR 2 EL 230 kV GASPAR 2 LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBNI REA 4802/2014 30/09/2016 29/09/2046 1,164,985.32
  GASPAR 2 EL 230 kV GASPAR 2 LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBNI REA 4802/2014 30/09/2016 29/09/2046 1,164,985.32
  GRAVATAI MG 525 kV GRAVATAI MG1 RS RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RMEL REN 643/2014 17/10/2014 16/10/2031 11,254.08
  GRAVATAI MG 525 kV GRAVATAI MG1 RS RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RMEL REN 643/2014 27/10/2014 26/10/2031 11,269.09
  GRAVATAI MC 525 kV RTL 525 kV 150 Mvar GRAVATAI RT1 RS RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2039 15,358.43
  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RMEL REN 643/2014 20/10/2013 19/10/2036 19,819.79
  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RMEL REN 643/2014 8/12/2013 7/12/2036 19,919.35
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB1 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBNI REA 5861/2016 7/6/2019 6/6/2034 21,143.39
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB2 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBNI REA 5861/2016 7/6/2019 6/6/2034 21,143.39
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB3 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBNI REA 5861/2016 7/6/2019 6/6/2034 21,143.39
  GRAVATAI EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBNI REA 5861/2016 5/6/2019 4/6/2034 34,666.88
  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBNI REA 4347/2013 12/4/2015 11/4/2045 41,183.54
  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBNI REA 4347/2013 12/4/2015 11/4/2045 41,183.54
  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBNI REA 4347/2013 12/4/2015 11/4/2045 41,183.54
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RMEL REN 643/2014 1/5/2014 30/04/2037 42,023.35
  GRAVATAI EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RMEL REN 643/2014 18/05/2014 17/05/2037 42,095.17
  GRAVATAI MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RMEL REN 643/2014 8/4/2015 7/4/2038 43,468.36
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RMEL REN 643/2014 10/4/2016 9/4/2039 45,023.23
  GRAVATAI MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RBNI REA 5861/2016 17/06/2019 16/06/2034 45,285.87
  GRAVATAI MC 525 kV RTL 525 kV 150 Mvar GRAVATAI RT1 RS RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RBNI REA 5861/2016 17/06/2019 16/06/2034 45,285.87
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBNI REA 5861/2016 3/6/2019 2/6/2034 51,990.89
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBNI REA 5861/2016 3/6/2019 2/6/2034 51,990.89
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBNI REA 5861/2016 3/6/2019 2/6/2034 51,990.89
  GRAVATAI EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RMEL REN 643/2014 13/03/2016 12/3/2046 59,978.50
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RMEL REN 643/2014 8/4/2015 7/4/2039 60,042.03
  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 78,128.00
  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 78,128.00
  GRAVATAI MC 230 kV TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 78,128.00
  GRAVATAI MC 525 kV RTL 525 kV 150 Mvar GRAVATAI RT1 RS RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 188,347.73
  GRAVATAI RTB 525 kV 50 Mvar GRAVATAI RTR1 RS RB FT RTB 525 kV 50 Mvar GRAVATAI RTR1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 188,987.87
  GRAVATAI RTB 525 kV 50 Mvar GRAVATAI RTR1 RS RB FT RTB 525 kV 50 Mvar GRAVATAI RTR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,486.33
  GRAVATAI MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 284,312.62
  GRAVATAI MC 525 kV RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 291,080.08
  GRAVATAI RTB 525 kV 50 Mvar GRAVATAI RTR1 RS RB FT RTB 525 kV 50 Mvar GRAVATAI RTR1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 298,049.29
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 303,656.99
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 303,656.99
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  GRAVATAI MC 525 kV TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB1 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,244.98
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB2 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,244.98
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB3 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,244.98
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB1 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB2 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  GRAVATAI IB 525 kV MG 525 kV GRAVATAI MG1 RS IB3 RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  GRAVATAI EL 525 kV GRAVATAI LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,051.19
  GRAVATAI EL 525 kV GRAVATAI LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  GRAVATAI EL 525 kV GRAVATAI LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  GRAVATAI TR 525/230 kV GRAVATAI TRR1 RS RB FT TR 525/230 kV GRAVATAI TRR1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 472,468.83
  GRAVATAI TR 525/230 kV GRAVATAI TRR1 RS RB FT TR 525/230 kV GRAVATAI TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 483,714.95
  GRAVATAI EL 525 kV GRAVATAI LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 542,596.80
  GRAVATAI RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RMEL REA 9918/2021 27/05/2021 27/05/2057 563,534.90
  GRAVATAI RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 566,963.61
  GRAVATAI RTL 525 kV 150 Mvar GRAVATAI RT1 RS RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 566,963.61
  GRAVATAI RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,458.98
  GRAVATAI RTL 525 kV 150 Mvar GRAVATAI RT1 RS RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,458.98
  GRAVATAI RTB 525 kV 150 Mvar GRAVATAI RT2 RS RB FT RTB 525 kV 150 Mvar GRAVATAI RT2 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 894,147.88
  GRAVATAI RTL 525 kV 150 Mvar GRAVATAI RT1 RS RB FT RTL 525 kV 150 Mvar GRAVATAI RT1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 894,147.88
  GRAVATAI MG 525 kV GRAVATAI MG1 RS RB FT MG 525 kV GRAVATAI MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,205,060.10
  GRAVATAI TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,417,406.50
  GRAVATAI TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,417,406.50
  GRAVATAI TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,417,406.50
  GRAVATAI TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  GRAVATAI TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  GRAVATAI TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  GRAVATAI TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RMEL REA 9918/2021 27/05/2021 27/05/2056 1,601,256.86
  GRAVATAI TR 525/230 kV GRAVATAI TR1 RS RB FT TR 525/230 kV GRAVATAI TR1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,235,365.70
  GRAVATAI TR 525/230 kV GRAVATAI TR2 RS RB FT TR 525/230 kV GRAVATAI TR2 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,235,365.70
  GRAVATAI TR 525/230 kV GRAVATAI TR3 RS RB FT TR 525/230 kV GRAVATAI TR3 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,235,365.70
  GRAVATAI 2 BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS 057/2001 IPCA RMEL REN 643/2014 16/08/2015 15/08/2043 23,338.46
  GRAVATAI 2 BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS 057/2001 IPCA RMEL REN 643/2014 23/08/2015 22/08/2043 23,349.23

 

 

29 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS 057/2001 IPCA RBNI REA 4347/2013 10/9/2015 9/9/2045 41,678.57
  GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS 057/2001 IPCA RBNI REA 4347/2013 10/9/2015 9/9/2045 41,678.57
  GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS 057/2001 IPCA RBNI REA 5861/2016 7/6/2019 6/6/2034 95,723.01
  GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS 057/2001 IPCA RBNI REA 5861/2016 7/6/2019 6/6/2034 95,723.01
  GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 135,525.50
  GRAVATAI 2 MC 230 kV BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 135,525.50
  GRAVATAI 2 BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC4 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 185,425.15
  GRAVATAI 2 BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS RB FT BC 230 kV 100 Mvar GRAVATAI 2 BC5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 185,425.15
  GRAVATAI 3 EL 230 kV GRAVATAI 3 LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS RB FT LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBNI REA 7761/2019 1/4/2021 31/03/2036 17,139.07
  GRAVATAI 3 IB 69 kV MG 230 kV GRAVATAI 3 MG1 RS IB2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,603.88
  GRAVATAI 3 MC 69 kV TR 230/69 kV GRAVATAI 3 TR1 RS RBF FT TR 230/69 kV GRAVATAI 3 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  GRAVATAI 3 EL 69 kV GRAVATAI 3  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  GRAVATAI 3 EL 69 kV GRAVATAI 3  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  GRAVATAI 3 EL 69 kV GRAVATAI 3  DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  GRAVATAI 3 IB 230 kV MG 230 kV GRAVATAI 3 MG1 RS IB1 RB FT MG 230 kV GRAVATAI 3 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  GRAVATAI 3 MC 230 kV TR 230/69 kV GRAVATAI 3 TR1 RS RBF FT TR 230/69 kV GRAVATAI 3 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  GRAVATAI 3 TR 230/69 kV GRAVATAI 3 TRR1 RS RBF FT TR 230/69 kV GRAVATAI 3 TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 156,075.79
  GRAVATAI 3 EL 230 kV GRAVATAI 3 LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS RB FT LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  GRAVATAI 3 EL 230 kV GRAVATAI 3 LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS RB FT LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  GRAVATAI 3 EL 230 kV GRAVATAI 3 LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS RB FT LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  GRAVATAI 3 MG 230 kV GRAVATAI 3 MG1 RS RB FT MG 230 kV GRAVATAI 3 MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 351,767.36
  GRAVATAI 3 TR 230/69 kV GRAVATAI 3 TR1 RS RBF FT TR 230/69 kV GRAVATAI 3 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 468,227.38
  GUARITA MG 230 kV GUARITA MG2 RS RB FT MG 230 kV GUARITA MG2 RS 002/2011 IPCA RBNI REA 6427/2017 1/7/2017 27/10/2047 43,696.74
  GUARITA EL 230 kV GUARITA LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS RB FT LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS 002/2011 IPCA RBNI REA 6427/2017 1/7/2017 27/10/2040 168,699.56
  IJUI 2 MG 230 kV IJUI 2 MG1 RS RB FT MG 230 kV IJUI 2 MG1 RS 011/2010 IPCA RBNI REA 7152/2018 9/1/2021 9/1/2052 37,695.72
  IJUI 2 IB 69 kV MG 230 kV IJUI 2 MG1 RS IB1 DIT   011/2010 IPCA RPEC CC 011/2010 6/10/2010 6/10/2040 75,608.94
  IJUI 2 EL 69 kV IJUI 2  PARA CERILUZ DIT   011/2010 IPCA RPEC CC 011/2010 6/10/2010 6/10/2040 132,298.11
  IJUI 2 EL 69 kV IJUI 2  PARA DEMEI DIT   011/2010 IPCA RPEC CC 011/2010 6/10/2010 6/10/2040 132,298.11
  IJUI 2 EL 69 kV IJUI 2  PARA IJUI 1 DIT   011/2010 IPCA RPEC CC 011/2010 6/10/2010 6/10/2040 132,298.11
  IJUI 2 EL 69 kV IJUI 2  PARA PANAMBI DIT   011/2010 IPCA RPEC CC 011/2010 6/10/2010 6/10/2040 132,298.11
  IJUI 2 MG 230 kV IJUI 2 MG1 RS RB FT MG 230 kV IJUI 2 MG1 RS 011/2010 IPCA RBNI REA 7152/2018 9/1/2021 9/1/2052 134,040.79
  IJUI 2 MC 69 kV TR 230/69 kV IJUI 2 TR1 RS RBF FT TR 230/69 kV IJUI 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 153,771.37
  IJUI 2 MC 69 kV TR 230/69 kV IJUI 2 TR2 RS RBF FT TR 230/69 kV IJUI 2 TR2 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 153,771.37
  IJUI 2 IB 230 kV MG 230 kV IJUI 2 MG1 RS IB1 RB FT MG 230 kV IJUI 2 MG1 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 285,425.71
  IJUI 2 MC 230 kV TR 230/69 kV IJUI 2 TR1 RS RBF FT TR 230/69 kV IJUI 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 386,650.62
  IJUI 2 MC 230 kV TR 230/69 kV IJUI 2 TR2 RS RBF FT TR 230/69 kV IJUI 2 TR2 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 386,650.62
  IJUI 2 MC 69 kV TR 230/69 kV IJUI 2 TR3 RS RBF FT TR 230/69 kV IJUI 2 TR3 RS 011/2010 IPCA RBNI REA 7152/2018 9/1/2021 9/1/2044 423,141.14
  IJUI 2 TR 230/69 kV IJUI 2 TR1 RS RBF FT TR 230/69 kV IJUI 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 950,568.87
  IJUI 2 TR 230/69 kV IJUI 2 TR2 RS RBF FT TR 230/69 kV IJUI 2 TR2 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 950,568.87
  IJUI 2 MG 230 kV IJUI 2 MG1 RS RB FT MG 230 kV IJUI 2 MG1 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 1,183,793.96
  IJUI 2 MC 230 kV TR 230/69 kV IJUI 2 TR3 RS RBF FT TR 230/69 kV IJUI 2 TR3 RS 011/2010 IPCA RBNI REA 7152/2018 9/1/2021 9/1/2044 1,186,635.15
  IJUI 2 TR 230/69 kV IJUI 2 TR3 RS RBF FT TR 230/69 kV IJUI 2 TR3 RS 011/2010 IPCA RBNI REA 7152/2018 9/1/2021 9/1/2055 1,332,092.47
  ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) C-1 SC DIT   057/2001 IPCA RMEL REN 643/2014 15/03/2014 14/03/2037 12,381.99
  ILHOTA MG 138 kV ILHOTA MG1 SC DIT   057/2001 IPCA RMEL REN 643/2014 13/05/2013 12/5/2030 21,622.27
  ILHOTA MC 138 kV TR 138/69 kV ILHOTA TR1 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048 28,514.42
  ILHOTA MC 138 kV TR 138/69 kV ILHOTA TR2 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048 28,514.42
  ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) C-1 SC DIT   057/2001 IPCA RCDM REA 2837/2011 8/12/2012 7/12/2042 29,344.11
  ILHOTA MC 13,8 kV TR 138/69 kV ILHOTA TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 33,500.60
  ILHOTA MC 13,8 kV TR 138/69 kV ILHOTA TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 33,500.60
  ILHOTA MC 69 kV TR 138/69 kV ILHOTA TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  ILHOTA MC 69 kV TR 138/69 kV ILHOTA TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  ILHOTA EL 69 kV ILHOTA  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  ILHOTA EL 69 kV ILHOTA  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  ILHOTA EL 69 kV ILHOTA  DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  ILHOTA MC 138 kV TR 138/69 kV ILHOTA TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,022.18
  ILHOTA MC 138 kV TR 138/69 kV ILHOTA TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,022.18
  ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 122,932.01
  ILHOTA EL 138 kV ILHOTA LT 138 kV BLUMENAU /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  ILHOTA EL 138 kV ILHOTA LT 138 kV GASPAR /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /ITAJAI C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  ILHOTA EL 138 kV ILHOTA LT 138 kV ILHOTA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  ILHOTA TR 138/69 kV ILHOTA TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 155,351.74
  ILHOTA TR 138/69 kV ILHOTA TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 155,351.74
  ILHOTA TR 138/69 kV ILHOTA TRR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 155,351.74
  ILHOTA MG 138 kV ILHOTA MG1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 289,715.20
  ILHOTA CS 20/-20 Mvar ILHOTA CS1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 615,401.25
  ILHOTA CS 20/-20 Mvar ILHOTA CS2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 615,401.25
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RMEL REN 643/2014 28/01/2015 27/01/2046 733.43
  ITA MC 500 kV RTB 500 kV 150 Mvar ITA RT1 SC RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RMEL REN 643/2014 11/6/2014 10/6/2047 2,020.23
  ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 25/08/2014 24/08/2045 2,173.64
  ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 443/2011 30/05/2015 29/05/2032 11,591.81
  ITA MG 500 kV ITA MG1 SC RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RMEL REN 443/2011 30/05/2015 29/05/2032 11,591.81
  ITA EL 500 kV ITA LT 500 kV CAXIAS /ITA C-1 RS/SC RB FT LT 500 kV CAXIAS /ITA C-1 RS/SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  ITA MG 500 kV ITA MG1 SC RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 443/2011 18/04/2016 17/04/2031 20,360.86
  ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-2 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC 004/2012 IPCA RBNI REA 5861/2016 26/04/2020 25/04/2034 28,459.58
  ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-2 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC 004/2012 IPCA RBNI REA 8314/2019 26/04/2020 25/04/2034 28,459.58
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBNI REA 5861/2016 26/04/2020 25/04/2034 28,459.58
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBNI REA 8314/2019 26/04/2020 25/04/2034 28,459.58
  ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RMEL REN 643/2014 14/05/2014 13/05/2037 42,078.27
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBNI REA 3578/2012 5/5/2017 4/5/2040 42,719.49

 

30 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  ITA RTB 500 kV 50 Mvar ITA RTR1 SC RB FT RTB 500 kV 50 Mvar ITA RTR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 188,987.87
  ITA RTB 500 kV 50 Mvar ITA RTR1 SC RB FT RTB 500 kV 50 Mvar ITA RTR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,486.33
  ITA MC 500 kV RTB 500 kV 150 Mvar ITA RT1 SC RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 284,312.62
  ITA MC 500 kV RTB 500 kV 150 Mvar ITA RT1 SC RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 291,080.08
  ITA RTB 500 kV 50 Mvar ITA RTR1 SC RB FT RTB 500 kV 50 Mvar ITA RTR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 298,049.29
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB5 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,244.98
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB6 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,244.98
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB1 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB2 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB5 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB6 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,051.19
  ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,051.19
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,051.19
  ITA EL 500 kV ITA LT 500 kV CAXIAS /ITA C-1 RS/SC RB FT LT 500 kV CAXIAS /ITA C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB5 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 508,206.62
  ITA IB 500 kV MG 500 kV ITA MG1 SC IB6 RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 508,206.62
  ITA EL 500 kV ITA LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 542,596.80
  ITA RTB 500 kV 150 Mvar ITA RT1 SC RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 566,963.61
  ITA RTB 500 kV 150 Mvar ITA RT1 SC RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,458.98
  ITA RTB 500 kV 150 Mvar ITA RT1 SC RB FT RTB 500 kV 150 Mvar ITA RT1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 894,147.88
  ITA MG 500 kV ITA MG1 SC RB FT MG 500 kV ITA MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,044,330.43
  ITA IB 500 kV MG 500 kV ITA MG4 SC IB7 RB FT MG 500 kV ITA MG4 SC 004/2012 IPCA RBL CC 004/2012 6/8/2014 10/5/2042 1,051,423.93
  ITA EL 500 kV ITA LT 500 kV S.SANTIAGO /ITA C-2 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC 004/2012 IPCA RBL CC 004/2012 4/2/2014 10/5/2042 1,109,596.32
  ITA EL 525 kV ITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBL CC 004/2012 6/8/2014 10/5/2042 1,109,596.32
  ITAJAI MG 230 kV ITAJAI MG1 SC RB FT MG 230 kV ITAJAI MG1 SC 057/2001 IPCA RBNI DSP 4033/2021 22/12/2021 21/12/2036 13,356.71
  ITAJAI IB 138 kV MG 230 kV ITAJAI MG1 SC IB2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,841.03
  ITAJAI MC 138 kV TR 230/138 kV ITAJAI TR1 SC RBF FT TR 230/138 kV ITAJAI TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,437.14
  ITAJAI MC 138 kV TR 230/138 kV ITAJAI TR2 SC RBF FT TR 230/138 kV ITAJAI TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,437.14
  ITAJAI MC 138 kV TR 230/138 kV ITAJAI TR3 SC RBF FT TR 230/138 kV ITAJAI TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,437.14
  ITAJAI MC 138 kV TR 230/138 kV ITAJAI TR4 SC RBF FT TR 230/138 kV ITAJAI TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,437.14
  ITAJAI MG 230 kV ITAJAI MG1 SC RB FT MG 230 kV ITAJAI MG1 SC 057/2001 IPCA RBNI REN 443/2011 19/06/2019 18/06/2050 91,065.23
  ITAJAI MG 230 kV ITAJAI MG1 SC RB FT MG 230 kV ITAJAI MG1 SC 057/2001 IPCA RBNI REN 443/2011 19/06/2019 18/06/2050 91,065.23
  ITAJAI IB 230 kV MG 230 kV ITAJAI MG1 SC IB1 RB FT MG 230 kV ITAJAI MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  ITAJAI MC 230 kV TR 230/138 kV ITAJAI TR1 SC RBF FT TR 230/138 kV ITAJAI TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  ITAJAI MC 230 kV TR 230/138 kV ITAJAI TR2 SC RBF FT TR 230/138 kV ITAJAI TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  ITAJAI MC 230 kV TR 230/138 kV ITAJAI TR3 SC RBF FT TR 230/138 kV ITAJAI TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  ITAJAI MC 230 kV TR 230/138 kV ITAJAI TR4 SC RBF FT TR 230/138 kV ITAJAI TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  ITAJAI EL 138 kV ITAJAI  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  ITAJAI EL 138 kV ITAJAI  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  ITAJAI EL 138 kV ITAJAI LT 138 kV CAMBORIU M.B. /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  ITAJAI EL 138 kV ITAJAI LT 138 kV ILHOTA /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  ITAJAI EL 138 kV ITAJAI LT 138 kV ILHOTA /ITAJAI C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  ITAJAI EL 138 kV ITAJAI LT 138 kV ITAJAI /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  ITAJAI EL 230 kV ITAJAI LT 230 kV BLUMENAU /ITAJAI C-1 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  ITAJAI EL 230 kV ITAJAI LT 230 kV BLUMENAU /ITAJAI C-2 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  ITAJAI TR 230/138 kV ITAJAI TR1 SC RBF FT TR 230/138 kV ITAJAI TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  ITAJAI TR 230/138 kV ITAJAI TR2 SC RBF FT TR 230/138 kV ITAJAI TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  ITAJAI TR 230/138 kV ITAJAI TR3 SC RBF FT TR 230/138 kV ITAJAI TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  ITAJAI MG 230 kV ITAJAI MG1 SC RB FT MG 230 kV ITAJAI MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 459,258.74
  ITAJAI EL 138 kV ITAJAI  BRUSQUE C2 DIT   057/2001 IPCA RCDM REN 443/2011 19/06/2019 18/06/2047 854,901.41
  ITAJAI EL 138 kV ITAJAI  ITAIPAVA C2 DIT   057/2001 IPCA RCDM REN 443/2011 19/06/2019 18/06/2047 854,901.41
  ITAJAI TR 230/138 kV ITAJAI TR4 SC RBF FT TR 230/138 kV ITAJAI TR4 SC 057/2001 IPCA RBNI REA 3339/2012 22/11/2014 21/11/2048 1,730,634.69
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-3 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-3 PR 057/2001 IPCA RMEL REN 643/2014 16/06/2014 15/06/2045 258.26
  IVAIPORA RTL 500 kV 150 Mvar IVAIPORA RT1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RMEL REN 643/2014 12/8/2015 11/8/2051 913.68
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RMEL REN 643/2014 16/06/2014 15/06/2045 970.94
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR 004/2004 IGPM RMEL REN 643/2014 30/11/2014 29/11/2045 971.79
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RMEL REN 643/2014 9/4/2014 8/4/2045 1,751.93
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RMEL REN 643/2014 22/09/2014 21/09/2045 2,097.73
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RMEL REN 643/2014 2/11/2014 1/11/2045 2,509.19
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RMEL REN 643/2014 21/10/2015 20/10/2046 2,578.37
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBNI REA 8314/2019 13/10/2019 12/10/2034 12,717.38
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-3 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-3 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  IVAIPORA MG 500 kV IVAIPORA MG1 PR RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RBNI REA 8314/2019 13/10/2019 12/10/2034 15,679.63
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR 004/2004 IGPM RBNI REA 5861/2016 31/05/2019 30/05/2034 16,741.93
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RMEL REN 643/2014 16/02/2014 15/02/2037 41,710.68
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RMEL REN 443/2011 13/09/2015 12/9/2038 44,135.94
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RMEL REN 443/2011 17/10/2015 16/10/2038 44,279.59
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RMEL REN 443/2011 14/12/2016 13/12/2039 46,071.08
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RMEL REN 443/2011 16/12/2016 15/12/2039 46,079.53
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB1 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,244.98
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB2 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,244.98
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB3 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,244.98
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB1 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB2 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB3 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB5 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,051.19

 

31 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,051.19
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-3 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-3 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB1 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 508,206.62
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB2 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 508,206.62
  IVAIPORA IB 500 kV MG 500 kV IVAIPORA MG1 PR IB3 RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 508,206.62
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 542,596.80
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 542,596.80
  IVAIPORA MG 500 kV IVAIPORA MG1 PR RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,377,567.63
  IVAIPORA MG 500 kV IVAIPORA MG1 PR RB FT MG 500 kV IVAIPORA MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,410,357.69
  IVAIPORA RTL 500 kV 150 Mvar IVAIPORA RT1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034 2,810,917.33
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034 3,378,698.15
  IVAIPORA EL 500 kV IVAIPORA LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034 3,378,698.15
  IVINHEMA 2 MC 138 kV TR 230/138 kV IVINHEMA 2 TR1 MS RBF FT TR 230/138 kV IVINHEMA 2 TR1 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044 211,349.22
  IVINHEMA 2 MC 138 kV TR 230/138 kV IVINHEMA 2 TR2 MS RBF FT TR 230/138 kV IVINHEMA 2 TR2 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044 211,349.22
  IVINHEMA 2 MC 230 kV TR 230/138 kV IVINHEMA 2 TR1 MS RBF FT TR 230/138 kV IVINHEMA 2 TR1 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044 278,958.45
  IVINHEMA 2 MC 230 kV TR 230/138 kV IVINHEMA 2 TR2 MS RBF FT TR 230/138 kV IVINHEMA 2 TR2 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044 278,958.45
  IVINHEMA 2 IB 138 kV MG 230 kV IVINHEMA 2 MG3 MS IB1 DIT   008/2014 IPCA RPEC CC 008/2014 29/01/2016 29/01/2044 351,932.25
  IVINHEMA 2 TR 230/138 kV IVINHEMA 2 TR1 MS RBF FT TR 230/138 kV IVINHEMA 2 TR1 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044 797,259.65
  IVINHEMA 2 TR 230/138 kV IVINHEMA 2 TR2 MS RBF FT TR 230/138 kV IVINHEMA 2 TR2 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044 797,259.65
  IVINHEMA 2 MG 230 kV IVINHEMA 2 MG3 MS RB FT MG 230 kV IVINHEMA 2 MG3 MS 008/2014 IPCA RBL CC 008/2014 29/01/2016 29/01/2044 1,440,931.99
  J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR11 SC RBF FT TR 230/69 kV J.LACERDA-A TR11 SC 057/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2048 77.69
  J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RMEL REN 643/2014 2/11/2014 1/11/2048 1,391.21
  J.LACERDA-A MG 230 kV J.LACERDA-A MG1 SC RB FT MG 230 kV J.LACERDA-A MG1 SC 057/2001 IPCA RMEL REN 643/2014 11/9/2014 10/9/2046 2,492.37
  J.LACERDA-A MG 230 kV J.LACERDA-A MG1 SC RB FT MG 230 kV J.LACERDA-A MG1 SC 057/2001 IPCA RMEL REN 643/2014 25/11/2016 24/11/2048 2,645.36
  J.LACERDA-A MC 69 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RMEL REN 643/2014 4/8/2013 3/8/2036 6,243.19
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV PALHOCA ESU /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RMEL REN 643/2014 10/7/2013 9/7/2036 12,071.78
  J.LACERDA-A MC 230 kV TR 230/138 kV J.LACERDA-A TR7 SC RBF FT TR 230/138 kV J.LACERDA-A TR7 SC 057/2001 IPCA RBNI REA 7761/2019 6/4/2022 5/4/2052 15,503.91
  J.LACERDA-A MC 230 kV TR 230/138 kV J.LACERDA-A TR5 SC RBF FT TR 230/138 kV J.LACERDA-A TR5 SC 057/2001 IPCA RMEL REN 643/2014 10/9/2014 9/9/2037 20,480.24
  J.LACERDA-A MC 69 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 41,140.04
  J.LACERDA-A MC 69 kV TR 138/69 kV J.LACERDA-A TR8 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,119.29
  J.LACERDA-A MC 69 kV TR 138/69 kV J.LACERDA-A TR9 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,119.29
  J.LACERDA-A MC 69 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 42,119.29
  J.LACERDA-A MC 69 kV TR 230/69 kV J.LACERDA-A TR11 SC RBF FT TR 230/69 kV J.LACERDA-A TR11 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 42,119.29
  J.LACERDA-A EL 69 kV J.LACERDA-A  BRACO NORTE DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,978.51
  J.LACERDA-A EL 69 kV J.LACERDA-A  TUBARAO C1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,978.51
  J.LACERDA-A EL 69 kV J.LACERDA-A  TUBARAO C2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,978.51
  J.LACERDA-A IB 138 kV MG 230 kV J.LACERDA-A MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,841.03
  J.LACERDA-A MC 138 kV TR 230/138 kV J.LACERDA-A TR5 SC RBF FT TR 230/138 kV J.LACERDA-A TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,022.18
  J.LACERDA-A MC 138 kV TR 230/138 kV J.LACERDA-A TR7 SC RBF FT TR 230/138 kV J.LACERDA-A TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,022.18
  J.LACERDA-A IB 230 kV MG 230 kV J.LACERDA-A MG1 SC IB2 RB FT MG 230 kV J.LACERDA-A MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 86,880.35
  J.LACERDA-A TR 230/138 kV J.LACERDA-A TR5 SC RBF FT TR 230/138 kV J.LACERDA-A TR5 SC 057/2001 IPCA RMEL REN 643/2014 7/9/2014 6/9/2042 88,148.41
  J.LACERDA-A TR 138/69 kV J.LACERDA-A TR8 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 95,866.40
  J.LACERDA-A TR 138/69 kV J.LACERDA-A TR8 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 98,148.30
  J.LACERDA-A TR 138/69 kV J.LACERDA-A TRR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 98,148.30
  J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 107,223.00
  J.LACERDA-A MC 230 kV TR 230/138 kV J.LACERDA-A TR5 SC RBF FT TR 230/138 kV J.LACERDA-A TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  J.LACERDA-A MC 230 kV TR 230/138 kV J.LACERDA-A TR7 SC RBF FT TR 230/138 kV J.LACERDA-A TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR11 SC RBF FT TR 230/69 kV J.LACERDA-A TR11 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV C.B.CATARINEN /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV IMBITUBA /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV J.LACERDA-A /U.JLACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV J.LACERDA-A /U.JLACERDA-A C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV J.LACERDA-A /U.JLACERDA-A C-3 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV LAGES /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  J.LACERDA-A EL 138 kV J.LACERDA-A LT 138 kV PALHOCA ESU /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  J.LACERDA-A TR 138/69 kV J.LACERDA-A TR9 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 151,739.90
  J.LACERDA-A TR 138/69 kV J.LACERDA-A TR9 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 155,351.74
  J.LACERDA-A EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  J.LACERDA-A EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  J.LACERDA-A EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /U.JLACERDA-A C-4 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  J.LACERDA-A EL 230 kV J.LACERDA-A LT 230 kV J.LACERDA-A /U.JLACERDA-A C-6 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  J.LACERDA-A MC 230 kV TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 169,099.43
  J.LACERDA-A TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 237,933.70
  J.LACERDA-A TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 243,597.20
  J.LACERDA-A TR 230/69 kV J.LACERDA-A TR11 SC RBF FT TR 230/69 kV J.LACERDA-A TR11 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 243,597.20
  J.LACERDA-A TR 230/138 kV J.LACERDA-A TR7 SC RBF FT TR 230/138 kV J.LACERDA-A TR7 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 244,427.10
  J.LACERDA-A TR 230/138 kV J.LACERDA-A TR5 SC RBF FT TR 230/138 kV J.LACERDA-A TR5 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,245.16
  J.LACERDA-A TR 230/138 kV J.LACERDA-A TR7 SC RBF FT TR 230/138 kV J.LACERDA-A TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,245.16
  J.LACERDA-A TR 230/69 kV J.LACERDA-A TR10 SC RBF FT TR 230/69 kV J.LACERDA-A TR10 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 375,240.85
  J.LACERDA-A MG 230 kV J.LACERDA-A MG1 SC RB FT MG 230 kV J.LACERDA-A MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 529,265.83
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC 057/2001 IPCA RMEL REN 643/2014 23/07/2014 22/07/2044 2,495.95
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RMEL REN 643/2014 17/09/2014 16/09/2044 2,507.29
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RMEL REN 643/2014 9/12/2015 8/12/2045 2,598.02
  J.LACERDA-B MG 230 kV J.LACERDA-B MG1 SC RB FT MG 230 kV J.LACERDA-B MG1 SC 057/2001 IPCA RMEL REN 643/2014 25/11/2016 24/11/2036 2,860.72
  J.LACERDA-B MG 230 kV J.LACERDA-B MG1 SC RB FT MG 230 kV J.LACERDA-B MG1 SC 057/2001 IPCA RMEL REN 643/2014 25/11/2016 24/11/2036 2,860.72
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-4 SC DIT   057/2001 IPCA RMEL REN 643/2014 17/10/2014 16/10/2031 11,499.83
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-4 SC DIT   057/2001 IPCA RMEL REN 643/2014 27/10/2014 26/10/2031 11,515.16
  J.LACERDA-B MG 230 kV J.LACERDA-B MG1 SC RB FT MG 230 kV J.LACERDA-B MG1 SC 057/2001 IPCA RBNI REA 6630/2017 28/11/2017 27/11/2034 19,834.03
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 8314/2019 6/12/2021 5/12/2036 25,973.86
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBNI REA 8314/2019 19/12/2021 18/12/2036 25,992.30

 

32 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  J.LACERDA-B IB 230 kV MG 230 kV J.LACERDA-B MG1 SC IB1 RB FT MG 230 kV J.LACERDA-B MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 150,312.39
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 153,890.26
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 158,128.40
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 158,128.40
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-3 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 158,128.40
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-B C-4 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 158,128.40
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 165,485.86
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 237,054.91
  J.LACERDA-B EL 230 kV J.LACERDA-B LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 260,984.70
  J.LACERDA-B MG 230 kV J.LACERDA-B MG1 SC RB FT MG 230 kV J.LACERDA-B MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 423,567.50
  JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR1 SC RBF FT TR 230/138 kV JOINV.NORTE TR1 SC 057/2001 IPCA RMEL REN 643/2014 11/4/2016 10/4/2050 109.51
  JOINV.NORTE IB 230 kV MG 230 kV JOINV.NORTE MG1 SC IB1 RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RMEL REN 643/2014 4/5/2016 3/5/2050 109.68
  JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR2 SC RBF FT TR 230/138 kV JOINV.NORTE TR2 SC 057/2001 IPCA RMEL REN 643/2014 17/07/2016 16/07/2050 110.25
  JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 31/01/2016 30/01/2045 152.65
  JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RMEL REN 643/2014 27/02/2016 26/02/2045 152.98
  JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2040 251.54
  JOINV.NORTE IB 138 kV MG 230 kV JOINV.NORTE MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,841.03
  JOINV.NORTE MC 138 kV TR 230/138 kV JOINV.NORTE TR1 SC RBF FT TR 230/138 kV JOINV.NORTE TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,437.14
  JOINV.NORTE MC 138 kV TR 230/138 kV JOINV.NORTE TR2 SC RBF FT TR 230/138 kV JOINV.NORTE TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,437.14
  JOINV.NORTE IB 230 kV MG 230 kV JOINV.NORTE MG1 SC IB1 RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 3161/2011 26/10/2013 25/10/2041 108,908.23
  JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR1 SC RBF FT TR 230/138 kV JOINV.NORTE TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR2 SC RBF FT TR 230/138 kV JOINV.NORTE TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 4802/2014 17/08/2016 16/08/2044 117,301.72
  JOINV.NORTE EL 138 kV JOINV.NORTE  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  JOINV.NORTE EL 138 kV JOINV.NORTE  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  JOINV.NORTE EL 138 kV JOINV.NORTE  DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  JOINV.NORTE EL 138 kV JOINV.NORTE  DIST4 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,273.11
  JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  JOINV.NORTE EL 230 kV JOINV.NORTE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 3161/2011 26/10/2013 25/10/2041 171,707.90
  JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 3915/2013 27/02/2015 26/02/2043 177,959.62
  JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 3915/2013 22/04/2015 21/04/2043 178,649.99
  JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBNI REA 4802/2014 17/08/2016 16/08/2044 184,825.00
  JOINV.NORTE TR 230/138 kV JOINV.NORTE TR1 SC RBF FT TR 230/138 kV JOINV.NORTE TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  JOINV.NORTE TR 230/138 kV JOINV.NORTE TR2 SC RBF FT TR 230/138 kV JOINV.NORTE TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  JOINV.NORTE BC 230 kV 100 Mvar JOINV.NORTE BC1 SC RB FT BC 230 kV 100 Mvar JOINV.NORTE BC1 SC 057/2001 IPCA RBNI REA 3915/2013 27/02/2015 26/02/2037 406,527.88
  JOINV.NORTE BC 230 kV 100 Mvar JOINV.NORTE BC2 SC RB FT BC 230 kV 100 Mvar JOINV.NORTE BC2 SC 057/2001 IPCA RBNI REA 3915/2013 22/04/2015 21/04/2037 408,478.64
  JOINV.NORTE MG 230 kV JOINV.NORTE MG1 SC RB FT MG 230 kV JOINV.NORTE MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 413,382.70
  JOINV.NORTE MC 138 kV TR 230/138 kV JOINV.NORTE TR3 SC RBF FT TR 230/138 kV JOINV.NORTE TR3 SC 057/2001 IPCA RBNI REA 3161/2011 26/10/2013 25/10/2043 774,788.28
  JOINV.NORTE MC 138 kV TR 230/138 kV JOINV.NORTE TR4 SC RBF FT TR 230/138 kV JOINV.NORTE TR4 SC 057/2001 IPCA RBNI REA 4802/2014 17/08/2016 16/08/2046 850,033.40
  JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR3 SC RBF FT TR 230/138 kV JOINV.NORTE TR3 SC 057/2001 IPCA RBNI REA 3161/2011 26/10/2013 25/10/2043 974,299.09
  JOINV.NORTE MC 230 kV BC 230 kV 100 Mvar JOINV.NORTE BC1 SC RB FT BC 230 kV 100 Mvar JOINV.NORTE BC1 SC 057/2001 IPCA RBNI REA 3915/2013 27/02/2015 26/02/2045 984,896.97
  JOINV.NORTE MC 230 kV BC 230 kV 100 Mvar JOINV.NORTE BC2 SC RB FT BC 230 kV 100 Mvar JOINV.NORTE BC2 SC 057/2001 IPCA RBNI REA 3915/2013 22/04/2015 21/04/2045 1,032,498.64
  JOINV.NORTE MC 230 kV TR 230/138 kV JOINV.NORTE TR4 SC RBF FT TR 230/138 kV JOINV.NORTE TR4 SC 057/2001 IPCA RBNI REA 4802/2014 17/08/2016 16/08/2046 1,068,299.62
  JOINV.NORTE TR 230/138 kV JOINV.NORTE TR3 SC RBF FT TR 230/138 kV JOINV.NORTE TR3 SC 057/2001 IPCA RBNI REA 3161/2011 26/10/2013 25/10/2047 1,582,524.25
  JOINV.NORTE TR 230/138 kV JOINV.NORTE TR4 SC RBF FT TR 230/138 kV JOINV.NORTE TR4 SC 057/2001 IPCA RBNI REA 4802/2014 17/08/2016 16/08/2050 1,684,651.14
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RMEL REN 643/2014 19/09/2014 18/09/2043 433.68
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR6 SC RBF FT TR 230/138 kV JOINVILLE TR6 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/6/2044 663.44
  JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/6/2044 1,492.72
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RMEL REN 643/2014 3/12/2015 2/12/2045 2,596.80
  JOINVILLE EL 138 kV JOINVILLE  DIST1 DIT   057/2001 IPCA RCDM REA 8314/2019 1/12/2021 30/11/2054 17,651.88
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2018 29/04/2048 18,256.59
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RBNI REA 7761/2019 30/04/2018 29/04/2048 18,256.59
  JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048 19,737.43
  JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RCDM REA 5484/2015 19/04/2018 18/04/2048 19,737.43
  JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RMEL REN 643/2014 6/10/2013 5/10/2036 19,791.34
  JOINVILLE MG 230 kV JOINVILLE MG1 SC RB FT MG 230 kV JOINVILLE MG1 SC 057/2001 IPCA RMEL REN 643/2014 8/3/2013 7/3/2030 21,195.82
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RCDM REA 7576/2019 1/12/2021 1/12/2037 24,662.15
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RCDM REA 7576/2019 1/12/2021 1/12/2037 24,662.15
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR6 SC RBF FT TR 230/138 kV JOINVILLE TR6 SC 057/2001 IPCA RBNI REA 7576/2019 1/12/2021 1/12/2038 27,410.62
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBNI REA 7576/2019 2/12/2021 2/12/2038 28,135.94
  JOINVILLE EL 138 kV JOINVILLE  DIST2 DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 29,065.90
  JOINVILLE EL 138 kV JOINVILLE  DIST3 DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 29,065.90
  JOINVILLE EL 138 kV JOINVILLE  DIST4 DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 29,065.90
  JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 29,065.90
  JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 29,065.90
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 29,065.90
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 29,065.90
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RCDM REA 2837/2011 19/08/2012 18/08/2042 29,065.90
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBNI REA 2837/2011 19/08/2012 18/08/2042 29,065.90
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBNI REA 2837/2011 19/08/2012 18/08/2042 29,065.90
  JOINVILLE MC 69 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 41,140.04
  JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,119.29
  JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,119.29
  JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,119.29
  JOINVILLE MC 69 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 42,119.29

 

33 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  JOINVILLE MG 230 kV JOINVILLE MG1 SC RB FT MG 230 kV JOINVILLE MG1 SC 057/2001 IPCA RBNI REA 7576/2019 28/01/2022 28/01/2037 44,152.04
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RCDM REA 8314/2019 1/12/2021 30/11/2054 47,168.81
  JOINVILLE EL 138 kV JOINVILLE  DIST3 DIT   057/2001 IPCA RCDM REA 8314/2019 1/12/2021 30/11/2054 48,756.84
  JOINVILLE EL 138 kV JOINVILLE  DIST2 DIT   057/2001 IPCA RCDM REA 8314/2019 1/12/2021 30/11/2054 51,289.90
  JOINVILLE EL 69 kV JOINVILLE  DIST6 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,978.51
  JOINVILLE EL 69 kV JOINVILLE  DIST7 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,978.51
  JOINVILLE MG 230 kV JOINVILLE MG1 SC RB FT MG 230 kV JOINVILLE MG1 SC 057/2001 IPCA RBNI REA 7576/2019 28/01/2022 28/01/2062 72,358.62
  JOINVILLE IB 138 kV MG 230 kV JOINVILLE MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,841.03
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBNI REA 7576/2019 21/11/2021 21/11/2045 77,204.66
  JOINVILLE IB 138 kV MG 230 kV JOINVILLE MG1 SC IB1 DIT   057/2001 IPCA RCDM REA 7576/2019 12/1/2022 12/1/2046 78,438.14
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 82,068.70
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 82,068.70
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,022.18
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,022.18
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,022.18
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,022.18
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,022.18
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR6 SC RBF FT TR 230/138 kV JOINVILLE TR6 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,022.18
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,022.18
  JOINVILLE IB 230 kV MG 230 kV JOINVILLE MG1 SC IB1 RB FT MG 230 kV JOINVILLE MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 86,880.35
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBNI REA 7576/2019 24/07/2021 24/07/2045 87,706.81
  JOINVILLE MC 69 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RCDM REA 7576/2019 15/06/2021 15/06/2047 101,002.44
  JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 107,223.00
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR6 SC RBF FT TR 230/138 kV JOINVILLE TR6 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  JOINVILLE TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 118,245.85
  JOINVILLE TR 138/69 kV JOINVILLE TRR1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 118,245.85
  JOINVILLE TR 138/69 kV JOINVILLE TR2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 121,060.45
  JOINVILLE TR 138/69 kV JOINVILLE TRR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 121,060.45
  JOINVILLE EL 138 kV JOINVILLE  DIST4 DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 122,932.01
  JOINVILLE EL 138 kV JOINVILLE  DIST5 DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 122,932.01
  JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 122,932.01
  JOINVILLE EL 138 kV JOINVILLE  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  JOINVILLE EL 138 kV JOINVILLE  DIST2 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  JOINVILLE EL 138 kV JOINVILLE  DIST3 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  JOINVILLE EL 138 kV JOINVILLE  DIST4 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  JOINVILLE EL 138 kV JOINVILLE  DIST5 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,858.15
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 129,429.04
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RCDM REA 2879/2011 17/08/2012 16/08/2040 142,223.45
  JOINVILLE TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 151,739.90
  JOINVILLE TR 138/69 kV JOINVILLE TR1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 155,351.74
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV JOINVILLE /VEGA DO SUL C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  JOINVILLE EL 230 kV JOINVILLE LT 230 kV JOINVILLE /VEGA DO SUL C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 169,099.43
  JOINVILLE MC 69 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBNI REA 7576/2019 17/09/2021 17/09/2049 175,475.69
  JOINVILLE TR 138/69 kV JOINVILLE TRR1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 186,483.36
  JOINVILLE MC 138 kV TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RCDM REA 7576/2019 15/06/2021 15/06/2038 189,752.19
  JOINVILLE EL 138 kV JOINVILLE  DIST4 DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 193,873.81
  JOINVILLE EL 138 kV JOINVILLE  DIST5 DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 193,873.81
  JOINVILLE EL 138 kV JOINVILLE LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 193,873.81
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBNI REA 7576/2019 24/07/2021 24/07/2036 208,290.43
  JOINVILLE TR 230/138 kV JOINVILLE TRR1 SC RBF FT TR 230/138 kV JOINVILLE TRR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 237,697.12
  JOINVILLE TR 230/138 kV JOINVILLE TRR2 SC RBF FT TR 230/138 kV JOINVILLE TRR2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 237,697.12
  JOINVILLE TR 230/138 kV JOINVILLE TRR1 SC RBF FT TR 230/138 kV JOINVILLE TRR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 243,354.99
  JOINVILLE TR 230/138 kV JOINVILLE TRR2 SC RBF FT TR 230/138 kV JOINVILLE TRR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 243,354.99
  JOINVILLE MC 138 kV TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBNI REA 2879/2011 28/06/2012 27/06/2040 244,570.03
  JOINVILLE MC 230 kV TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBNI REA 7576/2019 21/11/2021 21/11/2050 299,987.79
  JOINVILLE TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 319,522.13
  JOINVILLE TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  JOINVILLE TR 230/138 kV JOINVILLE TR6 SC RBF FT TR 230/138 kV JOINVILLE TR6 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  JOINVILLE MC 230 kV TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBNI REA 7576/2019 17/09/2021 17/09/2042 398,168.68
  JOINVILLE TR 230/138 kV JOINVILLE TR4 SC RBF FT TR 230/138 kV JOINVILLE TR4 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 503,912.47
  JOINVILLE MG 230 kV JOINVILLE MG1 SC RB FT MG 230 kV JOINVILLE MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 588,971.74
  JOINVILLE TR 138/69 kV JOINVILLE TR5 SC DIT   057/2001 IPCA RCDM REA 7576/2019 15/06/2021 15/06/2056 878,297.48
  JOINVILLE TR 230/138 kV JOINVILLE TR3 SC RBF FT TR 230/138 kV JOINVILLE TR3 SC 057/2001 IPCA RBNI REA 7576/2019 21/11/2021 21/11/2056 1,590,023.80
  JOINVILLE TR 230/138 kV JOINVILLE TR7 SC RBF FT TR 230/138 kV JOINVILLE TR7 SC 057/2001 IPCA RBNI REA 7576/2019 24/07/2021 24/07/2056 1,590,023.80
  JOINVILLE TR 230/69 kV JOINVILLE TR8 SC RBF FT TR 230/69 kV JOINVILLE TR8 SC 057/2001 IPCA RBNI REA 7576/2019 17/09/2021 17/09/2056 1,751,881.67
  JOINVILLE GM EL 138 kV JOINVILLE GM LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RMEL REN 643/2014 31/01/2014 30/01/2037 12,328.19
  JOINVILLE GM EL 138 kV JOINVILLE GM LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC DIT   057/2001 IPCA RMEL REN 643/2014 1/6/2014 31/05/2037 12,479.54
  JOINVILLE GM MG 138 kV JOINVILLE GM MG1 SC DIT   057/2001 IPCA RCDM REA 2589/2010 20/05/2012 19/05/2039 120,896.47
  JOINVILLE GM EL 138 kV JOINVILLE GM LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RCDM REA 2589/2010 20/05/2012 19/05/2041 762,843.16
  JOINVILLE GM EL 138 kV JOINVILLE GM LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC DIT   057/2001 IPCA RCDM REA 2589/2010 20/05/2012 19/05/2041 762,843.16
  JOINVILLE SANTA CATARINA MG 138 kV JOINVILLE SANTA CATARINA MG1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2041 268,100.51
  JOINVILLE SANTA CATARINA EL 138 kV JOINVILLE SANTA CATARINA LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2044 841,482.60
  JOINVILLE SANTA CATARINA EL 138 kV JOINVILLE SANTA CATARINA LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2044 841,482.60
  L.GRANDE MG 230 kV L.GRANDE MG1 RS RB FT MG 230 kV L.GRANDE MG1 RS 057/2001 IPCA RMEL REN 643/2014 13/03/2013 12/3/2030 23,907.65
  L.GRANDE MG 230 kV L.GRANDE MG1 RS RB FT MG 230 kV L.GRANDE MG1 RS 057/2001 IPCA RBNI REA 5861/2016 17/05/2019 16/05/2036 27,669.52
  L.GRANDE MC 230 kV TR 230/138 kV L.GRANDE TR1 RS RBF FT TR 230/138 kV L.GRANDE TR1 RS 011/2010 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036 35,571.91
  L.GRANDE IB 230 kV MG 230 kV L.GRANDE MG1 RS IB1 RB FT MG 230 kV L.GRANDE MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 86,880.35

 

34 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  L.GRANDE MG 230 kV L.GRANDE MG2 RS RB FT MG 230 kV L.GRANDE MG2 RS 011/2010 IPCA RBNI REA 4892/2014 29/09/2016 29/09/2047 87,966.91
  L.GRANDE MG 230 kV L.GRANDE MG2 RS RB FT MG 230 kV L.GRANDE MG2 RS 011/2010 IPCA RBNI REA 4892/2014 29/09/2016 29/09/2048 151,113.75
  L.GRANDE EL 230 kV L.GRANDE LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS RB FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  L.GRANDE EL 230 kV L.GRANDE LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  L.GRANDE IB 138 kV MG 230 kV L.GRANDE MG2 RS IB1 DIT   011/2010 IPCA RPEC CC 011/2010 6/10/2010 6/10/2040 164,771.67
  L.GRANDE MC 138 kV TR 230/138 kV L.GRANDE TR1 RS RBF FT TR 230/138 kV L.GRANDE TR1 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 240,237.24
  L.GRANDE MC 230 kV TR 230/138 kV L.GRANDE TR1 RS RBF FT TR 230/138 kV L.GRANDE TR1 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 309,144.97
  L.GRANDE EL 138 kV L.GRANDE  JAQUIRANA DIT   011/2010 IPCA RPEC CC 011/2010 6/10/2010 6/10/2040 319,996.52
  L.GRANDE EL 138 kV L.GRANDE  VACARIA DIT   011/2010 IPCA RPEC CC 011/2010 6/10/2010 6/10/2040 319,996.52
  L.GRANDE TR 230/138 kV L.GRANDE TR1 RS RBF FT TR 230/138 kV L.GRANDE TR1 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 497,977.10
  L.GRANDE MG 230 kV L.GRANDE MG2 RS RB FT MG 230 kV L.GRANDE MG2 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 676,594.71
  L.GRANDE MC 138 kV TR 230/138 kV L.GRANDE TR2 RS RBF FT TR 230/138 kV L.GRANDE TR2 RS 011/2010 IPCA RBNI REA 4892/2014 29/09/2016 29/09/2038 788,686.91
  L.GRANDE MC 230 kV TR 230/138 kV L.GRANDE TR2 RS RBF FT TR 230/138 kV L.GRANDE TR2 RS 011/2010 IPCA RBNI REA 4892/2014 29/09/2016 29/09/2040 1,031,232.71
  L.GRANDE TR 230/138 kV L.GRANDE TR2 RS RBF FT TR 230/138 kV L.GRANDE TR2 RS 011/2010 IPCA RBNI REA 4892/2014 29/09/2016 29/09/2050 1,206,762.27
  LONDRINA COT MG 230 kV LONDRINA COT MG2 PR RB FT MG 230 kV LONDRINA COT MG2 PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2051 123,993.36
  LONDRINA COT MG 230 kV LONDRINA COT MG2 PR RB FT MG 230 kV LONDRINA COT MG2 PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2042 251,535.88
  LONDRINA COT EL 230 kV LONDRINA COT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2043 1,004,354.07
  LONDRINA COT EL 230 kV LONDRINA COT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2043 1,004,354.07
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /MARINGA C-1 PR RB FT LT 230 kV LONDRINA ESU /MARINGA C-1 PR 057/2001 IPCA RMEL REN 643/2014 27/04/2014 26/04/2044 223.05
  LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR4 PR RB FT TR 500/230 kV LONDRINA ESU TR4 PR 057/2001 IPCA RMEL REN 643/2014 13/06/2014 12/6/2042 459.61
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RMEL REN 643/2014 12/9/2015 11/9/2045 860.06
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV IBIPORA /LONDRINA ESU C-1 PR RB FT LT 230 kV IBIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RMEL REN 643/2014 17/05/2016 16/05/2046 876.81
  LONDRINA ESU EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RMEL REN 643/2014 26/10/2014 25/10/2045 2,184.22
  LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RMEL REN 643/2014 12/6/2014 11/6/2042 2,323.32
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBNI REA 7761/2019 17/08/2021 16/08/2051 6,490.00
  LONDRINA ESU MG 500 kV LONDRINA ESU MG1 PR RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBNI REA 7152/2018 27/06/2020 27/06/2039 24,275.14
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBNI REA 7761/2019 13/08/2021 12/8/2051 32,728.16
  LONDRINA ESU EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RMEL REN 643/2014 2/8/2014 1/8/2037 42,416.29
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RMEL REN 643/2014 16/12/2013 15/12/2041 42,436.71
  LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RMEL REN 643/2014 26/04/2015 25/04/2038 43,544.41
  LONDRINA ESU IB 230 kV MG 500 kV LONDRINA ESU MG1 PR IB1 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 97,495.85
  LONDRINA ESU IB 230 kV MG 500 kV LONDRINA ESU MG1 PR IB1 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RBNI REA 7576/2019 14/12/2020 14/12/2043 106,825.94
  LONDRINA ESU MC 230 kV TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  LONDRINA ESU MC 230 kV TR 500/230 kV LONDRINA ESU TR4 PR RB FT TR 500/230 kV LONDRINA ESU TR4 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV IBIPORA /LONDRINA ESU C-1 PR RB FT LT 230 kV IBIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 159,968.93
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 159,968.93
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 159,968.93
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV IBIPORA /LONDRINA ESU C-1 PR RB FT LT 230 kV IBIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  LONDRINA ESU EL 230 kV LONDRINA ESU LT 230 kV LONDRINA ESU /MARINGA C-1 PR RB FT LT 230 kV LONDRINA ESU /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 303,656.99
  LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  LONDRINA ESU MC 500 kV TR 500/230 kV LONDRINA ESU TR4 PR RB FT TR 500/230 kV LONDRINA ESU TR4 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  LONDRINA ESU IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB1 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,244.98
  LONDRINA ESU IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB1 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  LONDRINA ESU IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB2 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  LONDRINA ESU EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,051.19
  LONDRINA ESU EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  LONDRINA ESU TR 500/230 kV LONDRINA ESU TRR1 PR RB FT TR 500/230 kV LONDRINA ESU TRR1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 483,714.95
  LONDRINA ESU IB 500 kV MG 500 kV LONDRINA ESU MG1 PR IB1 RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 508,206.62
  LONDRINA ESU EL 500 kV LONDRINA ESU LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 542,596.80
  LONDRINA ESU MG 500 kV LONDRINA ESU MG1 PR RB FT MG 500 kV LONDRINA ESU MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 905,310.78
  LONDRINA ESU RTB 525 kV 0 Mvar LONDRINA ESU RBR PR RB FT RTB 525 kV 50 Mvar LONDRINA ESU RBR PR 057/2001 IPCA RBNI REA 7152/2018 27/06/2020 27/06/2055 937,910.45
  LONDRINA ESU TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,417,406.50
  LONDRINA ESU TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  LONDRINA ESU TR 500/230 kV LONDRINA ESU TR4 PR RB FT TR 500/230 kV LONDRINA ESU TR4 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  LONDRINA ESU MC 525 kV RTB 525 kV 0 Mvar LONDRINA ESU RB1 PR RB FT RTB 525 kV 150 Mvar LONDRINA ESU RB1 PR 057/2001 IPCA RBNI REA 7152/2018 27/06/2020 27/06/2047 1,689,663.57
  LONDRINA ESU MC 525 kV RTB 525 kV 0 Mvar LONDRINA ESU RB2 PR RB FT RTB 525 kV 150 Mvar LONDRINA ESU RB2 PR 057/2001 IPCA RBNI REA 7152/2018 28/06/2020 28/06/2047 1,689,663.57
  LONDRINA ESU TR 500/230 kV LONDRINA ESU TR3 PR RB FT TR 500/230 kV LONDRINA ESU TR3 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,235,365.70
  LONDRINA ESU RTB 525 kV 0 Mvar LONDRINA ESU RB1 PR RB FT RTB 525 kV 150 Mvar LONDRINA ESU RB1 PR 057/2001 IPCA RBNI REA 7152/2018 27/06/2020 27/06/2055 2,813,731.37
  LONDRINA ESU RTB 525 kV 0 Mvar LONDRINA ESU RB2 PR RB FT RTB 525 kV 150 Mvar LONDRINA ESU RB2 PR 057/2001 IPCA RBNI REA 7152/2018 28/06/2020 28/06/2055 2,813,731.37
  LONDRINA SUL MG 230 kV LONDRINA SUL MG2 PR RB FT MG 230 kV LONDRINA SUL MG2 PR 057/2001 IPCA RBNI DSP 1302/2022 1/7/2022 30/06/2053 40,384.12
  LONDRINA SUL EL 230 kV LONDRINA SUL LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBNI DSP 1302/2022 1/7/2022 30/06/2051 204,373.39
  LONDRINA SUL EL 230 kV LONDRINA SUL LT 230 kV LONDRINA SUL /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA SUL /APUCARANA C-1 PR 057/2001 IPCA RBNI DSP 1302/2022 1/7/2022 30/06/2051 204,373.39
  LT  138 kV J.S.CATARINA /PICARRAS      SC LT 138 kV J.S.CATARINA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 605,095.87
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-3 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,592,156.64
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-4 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,592,156.64
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-3 SP/MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,630,054.54
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-4 SP/MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,630,054.54
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-3 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 2,510,960.93
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-4 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 2,510,960.93
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-2 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 2,585,155.22
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-2 SP/MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 2,646,689.34
  LT  138 kV JUPIA        /U.MIMOSO      SP/MS LT 138 kV JUPIA /U.MIMOSO C-2 SP/MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 4,077,000.70
  LT  230 kV CASCAVEL OEST/CASCAVEL      PR LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR RB FT LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 158,856.88
  LT  230 kV CASCAVEL OEST/CASCAVEL      PR LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR RB FT LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 162,638.13
  LT  230 kV CASCAVEL OEST/CASCAVEL      PR LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR RB FT LT 230 kV CASCAVEL OEST /CASCAVEL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 250,530.25
  LT  230 kV CASCAVEL OEST/GUAIRA        PR LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBNI REA 3232/2011 19/03/2013 18/03/2041 123,888.26
  LT  230 kV CASCAVEL OEST/GUAIRA        PR LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,687,520.01
  LT  230 kV CASCAVEL OEST/GUAIRA        PR LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,727,687.83
  LT  230 kV CASCAVEL OEST/GUAIRA        PR LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR RB FT LT 230 kV CASCAVEL OEST /GUAIRA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,661,356.75
  LT  230 kV PASSO FUNDO  /U.PASSO FUNDO RS LT 230 kV PASSO FUNDO /U.PASSO FUNDO C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 6,321.27
  LT  230 kV PASSO FUNDO  /U.PASSO FUNDO RS LT 230 kV PASSO FUNDO /U.PASSO FUNDO C-2 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 6,321.27

 

35 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 138 kV ANASTACIO /AQUIDAUANA MS LT 138 kV ANASTACIO /AQUIDAUANA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 96,970.86
  LT 138 kV ANASTACIO /AQUIDAUANA MS LT 138 kV ANASTACIO /AQUIDAUANA C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 99,279.04
  LT 138 kV ANASTACIO /AQUIDAUANA MS LT 138 kV ANASTACIO /AQUIDAUANA C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 99,279.04
  LT 138 kV ANASTACIO /AQUIDAUANA MS LT 138 kV ANASTACIO /AQUIDAUANA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 152,930.95
  LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA SC LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2054 132,845.62
  LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA SC LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 176,309.14
  LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA SC LT 138 kV ARAQUARI (HYOSUNG) /JOINVILLE SANTA CATARINA C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2054 565,799.88
  LT 138 kV BIGUACU /ITAJAIFAZENDA SC LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RCDM REA 8314/2019 13/07/2020 12/7/2035 310.86
  LT 138 kV BIGUACU /ITAJAIFAZENDA SC LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 605,037.45
  LT 138 kV BIGUACU /ITAJAIFAZENDA SC LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 619,439.08
  LT 138 kV BIGUACU /ITAJAIFAZENDA SC LT 138 kV BIGUACU /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 954,193.42
  LT 138 kV BIGUACU /TIJUCAS SC LT 138 kV BIGUACU /TIJUCAS C-1 SC DIT   057/2001 IPCA RCDM REA 2879/2011 20/11/2012 19/11/2043 38,579.10
  LT 138 kV BIGUACU /TIJUCAS SC LT 138 kV BIGUACU /TIJUCAS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 326,103.45
  LT 138 kV BLUMENAU /ILHOTA SC LT 138 kV BLUMENAU /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 475,186.28
  LT 138 kV BLUMENAU /ILHOTA SC LT 138 kV BLUMENAU /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 486,497.08
  LT 138 kV BLUMENAU /ILHOTA SC LT 138 kV BLUMENAU /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 749,407.54
  LT 138 kV CAMBORIU M.B. /ITAJAI SC LT 138 kV CAMBORIU M.B. /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 157,331.58
  LT 138 kV CAMBORIU M.B. /ITAJAI SC LT 138 kV CAMBORIU M.B. /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 161,076.52
  LT 138 kV CAMBORIU M.B. /ITAJAI SC LT 138 kV CAMBORIU M.B. /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 248,124.73
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 788,434.22
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 788,434.22
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 807,201.22
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 807,201.22
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,243,425.09
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,243,425.09
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,280,166.03
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,310,637.66
  LT 138 kV CAMPO GRANDE /U.MIMOSO MS LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 2,018,926.27
  LT 138 kV D.DAS NACOES /IVINHEMA MS LT 138 kV D.DAS NACOES /IVINHEMA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 872,101.16
  LT 138 kV D.DAS NACOES /IVINHEMA MS LT 138 kV D.DAS NACOES /IVINHEMA C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 892,859.68
  LT 138 kV D.DAS NACOES /IVINHEMA MS LT 138 kV D.DAS NACOES /IVINHEMA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,375,374.69
  LT 138 kV ELDORADO /GUAIRA MS/PR LT 138 kV ELDORADO /GUAIRA C-1 MS/PR DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 199,767.37
  LT 138 kV ELDORADO /GUAIRA MS/PR LT 138 kV ELDORADO /GUAIRA C-1 MS/PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 204,522.41
  LT 138 kV ELDORADO /GUAIRA MS/PR LT 138 kV ELDORADO /GUAIRA C-1 MS/PR DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 315,049.44
  LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 83,866.69
  LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 83,866.69
  LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 85,862.96
  LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 85,862.96
  LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,264.61
  LT 138 kV FLORIANOPOLIS /PALHOCA ESU SC LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,264.61
  LT 138 kV GASPAR /ILHOTA SC LT 138 kV GASPAR /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 132,390.21
  LT 138 kV GASPAR /ILHOTA SC LT 138 kV GASPAR /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 135,541.48
  LT 138 kV GASPAR /ILHOTA SC LT 138 kV GASPAR /ILHOTA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 208,790.16
  LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) SC LT 138 kV ILHOTA /ARAQUARI (HYOSUNG) C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 448,409.78
  LT 138 kV ILHOTA /ITAJAI SC LT 138 kV ILHOTA /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 93,264.17
  LT 138 kV ILHOTA /ITAJAI SC LT 138 kV ILHOTA /ITAJAI C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 95,484.13
  LT 138 kV ILHOTA /PICARRAS SC LT 138 kV ILHOTA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 174,944.20
  LT 138 kV ILHOTA /PICARRAS SC LT 138 kV ILHOTA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 179,108.38
  LT 138 kV ILHOTA /PICARRAS SC LT 138 kV ILHOTA /PICARRAS C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 275,901.28
  LT 138 kV ITAJAI /ITAJAIFAZENDA SC LT 138 kV ITAJAI /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RCDM REA 8314/2019 13/07/2020 12/7/2035 310.86
  LT 138 kV ITAJAI /ITAJAIFAZENDA SC LT 138 kV ITAJAI /ITAJAIFAZENDA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 64,745.26
  LT 138 kV IVINHEMA /IVINHEMA 2 MS LT 138 kV IVINHEMA /IVINHEMA 2 C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 224,471.66
  LT 138 kV IVINHEMA /IVINHEMA 2 MS LT 138 kV IVINHEMA /IVINHEMA 2 C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 229,814.73
  LT 138 kV IVINHEMA /IVINHEMA 2 MS LT 138 kV IVINHEMA /IVINHEMA 2 C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 354,010.12
  LT 138 kV IVINHEMA /IVINHEMA 2 MS LT 138 kV IVINHEMA /IVINHEMA 2 C-1 MS DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2080 637,537.71
  LT 138 kV IVINHEMA 2 /NOVA ANDRADINA MS LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 194,542.10
  LT 138 kV IVINHEMA 2 /NOVA ANDRADINA MS LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 199,172.76
  LT 138 kV IVINHEMA 2 /NOVA ANDRADINA MS LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 306,808.77
  LT 138 kV IVINHEMA 2 /NOVA ANDRADINA MS LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2045 687,882.03
  LT 138 kV JOINVILLE /J.S.CATARINA SC LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 130,735.33
  LT 138 kV JOINVILLE /J.S.CATARINA SC LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 133,847.21
  LT 138 kV JOINVILLE /J.S.CATARINA SC LT 138 kV JOINVILLE /J.S.CATARINA C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 206,180.28
  LT 138 kV JOINVILLE GM /JOINVILLE SC LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 93,340.13
  LT 138 kV JOINVILLE GM /JOINVILLE SC LT 138 kV JOINVILLE GM /JOINVILLE C-1 SC DIT   057/2001 IPCA RCDM REA 2589/2010 20/05/2012 19/05/2043 876,110.54
  LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM SC LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2054 23,318.18
  LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM SC LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 26,550.08
  LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM SC LT 138 kV JOINVILLE SANTA CATARINA /JOINVILLE GM C-1 SC DIT   057/2001 IPCA RCDM REA 4325/2013 20/10/2015 19/10/2054 315,355.46
  LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA MS/SP LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA C-1 MS/SP DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 419,013.76
  LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA MS/SP LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA C-1 MS/SP DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 428,987.49
  LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA MS/SP LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA C-1 MS/SP DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 660,818.88
  LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA MS/SP LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA C-1 MS/SP DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2050 675,202.77
  LT 138 kV TIJUCAS /CAMBORIU M.B. SC LT 138 kV TIJUCAS /CAMBORIU M.B. C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 282,622.99
  LT 230 kV ANASTACIO /DOURADOS MS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,820,110.71
  LT 230 kV ANASTACIO /DOURADOS MS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,887,237.43
  LT 230 kV ANASTACIO /DOURADOS MS LT 230 kV ANASTACIO /DOURADOS C-1 MS RB FT LT 230 kV ANASTACIO /DOURADOS C-1 MS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,447,544.67
  LT 230 kV AREIA /PONTA GROSSA PR LT 230 kV AREIA /PONTA GROSSA C-1 PR RB FT LT 230 kV AREIA /PONTA GROSSA C-1 PR 057/2001 IPCA RBNI DSP 1281/2022 1/7/2022 30/06/2056 42,209.94
  LT 230 kV AREIA /PONTA GROSSA PR LT 230 kV AREIA /PONTA GROSSA C-1 PR RB FT LT 230 kV AREIA /PONTA GROSSA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,214,368.58
  LT 230 kV AREIA /PONTA GROSSA PR LT 230 kV AREIA /PONTA GROSSA C-1 PR RB FT LT 230 kV AREIA /PONTA GROSSA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,267,076.90
  LT 230 kV AREIA /S. OSORIO PR LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,088,138.87
  LT 230 kV AREIA /S. OSORIO PR LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,089,609.77
  LT 230 kV AREIA /S. OSORIO PR LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,137,842.57
  LT 230 kV AREIA /S. OSORIO PR LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,139,348.48
  LT 230 kV AREIA /S.MATEUS SUL PR LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,724,961.03
  LT 230 kV AREIA /S.MATEUS SUL PR LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,766,020.05
  LT 230 kV AREIA /S.MATEUS SUL PR LT 230 kV AREIA /S.MATEUS SUL C-1 PR RB FT LT 230 kV AREIA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,720,404.28
  LT 230 kV ASSIS /LONDRINA COT SP/PR LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,528,395.70

 

36 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 230 kV ASSIS /LONDRINA COT SP/PR LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,564,775.91
  LT 230 kV ASSIS /LONDRINA COT SP/PR LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,765,134.54
  LT 230 kV ASSIS /LONDRINA COT SP/PR LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,807,149.81
  LT 230 kV ASSIS /LONDRINA COT SP/PR LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-1 SP/PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,410,404.72
  LT 230 kV ASSIS /LONDRINA COT SP/PR LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR RB FT LT 230 kV ASSIS /LONDRINA COT C-2 SP/PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,783,761.19
  LT 230 kV ATLANTIDA 2 /GRAVATAI 3 RS LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS RB FT LT 230 kV ATLANTIDA 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,371,335.11
  LT 230 kV ATLANTIDA 2 /OSORIO 2 RS LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS RB FT LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 614,081.56
  LT 230 kV BIGUACU /DESTERRO SC LT 230 kV BIGUACU /DESTERRO C-1 SC RB FT LT 230 kV BIGUACU /DESTERRO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 774,584.61
  LT 230 kV BIGUACU /GASPAR 2 SC LT 230 kV BIGUACU /GASPAR 2 C-1 SC RB FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC 057/2001 IPCA RBNI REA 7009/2018 1/7/2018 22/01/2055 30,223.36
  LT 230 kV BIGUACU /GASPAR 2 SC LT 230 kV BIGUACU /GASPAR 2 C-1 SC RB FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,409,386.76
  LT 230 kV BIGUACU /GASPAR 2 SC LT 230 kV BIGUACU /GASPAR 2 C-1 SC RB FT LT 230 kV BIGUACU /GASPAR 2 C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,442,934.21
  LT 230 kV BIGUACU /J.LACERDA-B SC LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RMEL REA 7759/2019 7/5/2020 7/5/2051 262,271.56
  LT 230 kV BIGUACU /J.LACERDA-B SC LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RMEL REN 643/2014 30/08/2014 29/08/2051 351,990.62
  LT 230 kV BIGUACU /J.LACERDA-B SC LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,731,646.92
  LT 230 kV BIGUACU /J.LACERDA-B SC LT 230 kV BIGUACU /J.LACERDA-B C-1 SC RB FT LT 230 kV BIGUACU /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,772,865.09
  LT 230 kV BIGUACU /PALHOCA ESU SC LT 230 kV BIGUACU /PALHOCA ESU C-1 SC RB FT LT 230 kV BIGUACU /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 347,979.55
  LT 230 kV BLUMENAU /ITAJAI SC LT 230 kV BLUMENAU /ITAJAI C-1 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 405,749.88
  LT 230 kV BLUMENAU /ITAJAI SC LT 230 kV BLUMENAU /ITAJAI C-2 SC RB FT LT 230 kV BLUMENAU /ITAJAI C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 405,749.88
  LT 230 kV BLUMENAU /JOINV.NORTE SC LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 974,134.97
  LT 230 kV BLUMENAU /JOINV.NORTE SC LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC RB FT LT 230 kV BLUMENAU /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 997,322.18
  LT 230 kV BLUMENAU /JOINVILLE SC LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 895,909.99
  LT 230 kV BLUMENAU /JOINVILLE SC LT 230 kV BLUMENAU /JOINVILLE C-1 SC RB FT LT 230 kV BLUMENAU /JOINVILLE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 917,235.22
  LT 230 kV C.I.AUT.GRA /GRAVATAI 3 RS LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS RB FT LT 230 kV C.I.AUT.GRA /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 36,662.03
  LT 230 kV C.MOURAO /APUCARANA PR LT 230 kV C.MOURAO /APUCARANA C-1 PR RB FT LT 230 kV C.MOURAO /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,531,070.06
  LT 230 kV C.MOURAO /APUCARANA PR LT 230 kV C.MOURAO /APUCARANA C-1 PR RB FT LT 230 kV C.MOURAO /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,567,513.92
  LT 230 kV C.MOURAO /MARINGA PR LT 230 kV C.MOURAO /MARINGA C-1 PR RB FT LT 230 kV C.MOURAO /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,068,406.09
  LT 230 kV C.MOURAO /MARINGA PR LT 230 kV C.MOURAO /MARINGA C-1 PR RB FT LT 230 kV C.MOURAO /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,093,837.23
  LT 230 kV C.MOURAO /S. OSORIO PR LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,422,968.52
  LT 230 kV C.MOURAO /S. OSORIO PR LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,424,305.69
  LT 230 kV C.MOURAO /S. OSORIO PR LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,480,642.12
  LT 230 kV C.MOURAO /S. OSORIO PR LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,482,011.13
  LT 230 kV CAMAQUA 3 /NOVA STA RITA RS LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS RB FT LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS 004/2012 IPCA RBL CC 004/2012 9/12/2014 10/5/2042 8,294,068.65
  LT 230 kV CAMAQUA 3 /POVO NOVO RS LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS RB FT LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS 004/2012 IPCA RBL CC 004/2012 9/12/2014 10/5/2042 8,736,983.50
  LT 230 kV CANOINHAS ESU /S.MATEUS SUL SC/PR LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR RB FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 637,834.43
  LT 230 kV CANOINHAS ESU /S.MATEUS SUL SC/PR LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR RB FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 653,016.72
  LT 230 kV CANOINHAS ESU /S.MATEUS SUL SC/PR LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR RB FT LT 230 kV CANOINHAS ESU /S.MATEUS SUL C-1 SC/PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,005,916.93
  LT 230 kV CAXIAS /CAXIAS SUL 5 RS LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV CAXIAS /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 338,678.84
  LT 230 kV CURITIBA /JOINV.NORTE PR/SC LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,288,505.77
  LT 230 kV CURITIBA /JOINV.NORTE PR/SC LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINV.NORTE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,319,175.91
  LT 230 kV CURITIBA /JOINVILLE PR/SC LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,333,167.56
  LT 230 kV CURITIBA /JOINVILLE PR/SC LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC RB FT LT 230 kV CURITIBA /JOINVILLE C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,364,900.77
  LT 230 kV CURITIBA /S.MATEUS SUL PR LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,560,488.00
  LT 230 kV CURITIBA /S.MATEUS SUL PR LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,597,632.09
  LT 230 kV CURITIBA /S.MATEUS SUL PR LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR RB FT LT 230 kV CURITIBA /S.MATEUS SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,461,016.90
  LT 230 kV DOURADOS /GUAIRA MS/PR LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,028,710.64
  LT 230 kV DOURADOS /GUAIRA MS/PR LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,100,802.65
  LT 230 kV DOURADOS /GUAIRA MS/PR LT 230 kV DOURADOS /GUAIRA C-1 MS/PR RB FT LT 230 kV DOURADOS /GUAIRA C-1 MS/PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,776,523.80
  LT 230 kV FARROUPILHA /CAXIAS SUL 5 RS LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV FARROUPILHA /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 269,557.63
  LT 230 kV FARROUPILHA /MONTE CLARO RS LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RMEL REA 7759/2019 9/3/2020 9/3/2051 147,182.89
  LT 230 kV FARROUPILHA /MONTE CLARO RS LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 423,844.81
  LT 230 kV FARROUPILHA /MONTE CLARO RS LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 424,392.42
  LT 230 kV FORQUILHINHA /L.GRANDE SC/RS LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS RB FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS 057/2001 IPCA RMEL REN 643/2014 21/03/2016 20/03/2044 10,893.56
  LT 230 kV FORQUILHINHA /L.GRANDE SC/RS LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS RB FT LT 230 kV FORQUILHINHA /L.GRANDE C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 187,636.03
  LT 230 kV FORQUILHINHA /SIDEROPOL.ESU SC LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 187,636.03
  LT 230 kV FOZ DO CHAPECO /GUARITA RS LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS RB FT LT 230 kV FOZ DO CHAPECO /GUARITA C-1 RS 002/2011 IPCA RBNI REA 6427/2017 1/7/2017 27/10/2045 707,258.87
  LT 230 kV FOZ DO CHAPECO /PINHALZINHO RS/SC LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 1,814,095.94
  LT 230 kV FOZ DO CHAPECO /PINHALZINHO RS/SC LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 1,814,095.95
  LT 230 kV FOZ DO CHAPECO /XANXERE ESU RS/SC LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC 002/2011 IPCA RBNI REA 6454/2017 1/7/2017 15/06/2052 986,125.59
  LT 230 kV FOZ DO CHAPECO /XANXERE ESU RS/SC LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC 002/2011 IPCA RBNI REA 6454/2017 1/7/2017 15/06/2052 986,125.59
  LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RBNI REA 7009/2018 1/7/2018 22/01/2055 30,223.36
  LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 147,089.70
  LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-1 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,590.86
  LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 173,967.00
  LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 178,107.91
  LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 274,360.15
  LT 230 kV GASPAR 2 /BLUMENAU SC LT 230 kV GASPAR 2 /BLUMENAU C-2 SC RB FT LT 230 kV GASPAR 2 /BLUMENAU C-2 SC 057/2001 IPCA RBNI REA 4802/2014 30/09/2016 29/09/2064 605,199.41
  LT 230 kV GASPAR 2 /PALHOCA ESU SC LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBNI REA 4802/2014 30/09/2016 29/09/2044 639,085.12
  LT 230 kV GASPAR 2 /PALHOCA ESU SC LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,616,515.80
  LT 230 kV GASPAR 2 /PALHOCA ESU SC LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,654,993.52
  LT 230 kV GASPAR 2 /PALHOCA ESU SC LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,549,377.31
  LT 230 kV GRAVATAI 2 /GRAVATAI 3 RS LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS RB FT LT 230 kV GRAVATAI 2 /GRAVATAI 3 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,085.80
  LT 230 kV J.LACERDA-A /J.LACERDA-B SC LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 10,976.54
  LT 230 kV J.LACERDA-A /J.LACERDA-B SC LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 11,237.81
  LT 230 kV J.LACERDA-A /J.LACERDA-B SC LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC RB FT LT 230 kV J.LACERDA-A /J.LACERDA-B C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 11,237.81
  LT 230 kV J.LACERDA-B /PALHOCA ESU SC LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC 057/2001 IPCA RMEL REA 7759/2019 4/12/2019 4/12/2050 53,514.35
  LT 230 kV J.LACERDA-B /PALHOCA ESU SC LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,612,637.99
  LT 230 kV J.LACERDA-B /PALHOCA ESU SC LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,651,023.40
  LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 632,485.71
  LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 647,540.69
  LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 660,566.47
  LT 230 kV J.LACERDA-B /SIDEROPOL.ESU SC LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 676,289.85
  LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 6,860.34
  LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 6,860.34
  LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 7,023.63
  LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 7,023.63
  LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 10,819.31

 

37 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 230 kV J.LACERDA-B /U.JLACERDA-C SC LT 230 kV J.LACERDA-B /U.JLACERDA-C C-2 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 10,819.31
  LT 230 kV JOINVILLE /JOINV.NORTE SC LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 84,563.21
  LT 230 kV JOINVILLE /JOINV.NORTE SC LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC RB FT LT 230 kV JOINVILLE /JOINV.NORTE C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 86,576.05
  LT 230 kV JOINVILLE /VEGA DO SUL SC LT 230 kV JOINVILLE /VEGA DO SUL C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 476,526.50
  LT 230 kV JOINVILLE /VEGA DO SUL SC LT 230 kV JOINVILLE /VEGA DO SUL C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 476,526.50
  LT 230 kV L.GRANDE /CAXIAS SUL 5 RS LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS RB FT LT 230 kV L.GRANDE /CAXIAS SUL 5 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 898,069.11
  LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RMEL REA 7759/2019 27/05/2019 27/05/2050 109,136.52
  LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 327,550.74
  LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 335,347.39
  LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 422,548.59
  LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 432,606.46
  LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-2 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 516,574.24
  LT 230 kV LONDRINA ESU /LONDRINA COT PR LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA COT C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 666,393.61
  LT 230 kV LONDRINA ESU /LONDRINA SUL PR LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBNI DSP 1302/2022 1/7/2022 30/06/2057 20,525.74
  LT 230 kV LONDRINA ESU /LONDRINA SUL PR LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 406,502.44
  LT 230 kV LONDRINA ESU /LONDRINA SUL PR LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 416,178.37
  LT 230 kV LONDRINA ESU /LONDRINA SUL PR LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR RB FT LT 230 kV LONDRINA ESU /LONDRINA SUL C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 641,087.52
  LT 230 kV LONDRINA ESU /MARINGA PR LT 230 kV LONDRINA ESU /MARINGA C-1 PR RB FT LT 230 kV LONDRINA ESU /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,274,331.68
  LT 230 kV LONDRINA ESU /MARINGA PR LT 230 kV LONDRINA ESU /MARINGA C-1 PR RB FT LT 230 kV LONDRINA ESU /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,304,664.43
  LT 230 kV LONDRINA SUL /APUCARANA PR LT 230 kV LONDRINA SUL /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA SUL /APUCARANA C-1 PR 057/2001 IPCA RBNI DSP 1302/2022 1/7/2022 30/06/2057 20,525.74
  LT 230 kV LONDRINA SUL /APUCARANA PR LT 230 kV LONDRINA SUL /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA SUL /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 133,717.91
  LT 230 kV LONDRINA SUL /APUCARANA PR LT 230 kV LONDRINA SUL /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA SUL /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 136,900.78
  LT 230 kV LONDRINA SUL /APUCARANA PR LT 230 kV LONDRINA SUL /APUCARANA C-1 PR RB FT LT 230 kV LONDRINA SUL /APUCARANA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 210,884.05
  LT 230 kV MACAMBARA /SANTO ANGELO RS LT 230 kV MACAMBARA /SANTO ANGELO C-1 RS RB FT LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS 007/2014 IPCA RBL CC 007/2014 6/12/2019 29/01/2044 8,276,038.69
  LT 230 kV MONTE CLARO /NOVA PRATA 2 RS LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 335,421.34
  LT 230 kV MONTE CLARO /NOVA PRATA 2 RS LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 423,023.41
  LT 230 kV MONTE CLARO /NOVA PRATA 2 RS LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2049 1,161,668.45
  LT 230 kV MONTE CLARO /NOVA PRATA 2 RS LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 8795/2020 24/05/2022 24/05/2050 1,435,094.00
  LT 230 kV MONTE CLARO /NOVA PRATA 2 RS LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBNIA REA 8795/2020     1,486,170.51
  LT 230 kV MONTE CLARO /VINHEDOS RS LT 230 kV MONTE CLARO /VINHEDOS C-1 RS RB FT LT 230 kV MONTE CLARO /VINHEDOS C-1 RS 012/2010 IPCA RBNI DSP 1247/2022 1/7/2022 30/06/2057 31,370.87
  LT 230 kV MONTE CLARO /VINHEDOS RS LT 230 kV MONTE CLARO /VINHEDOS C-1 RS RB FT LT 230 kV MONTE CLARO /VINHEDOS C-1 RS 012/2010 IPCA RBL CC 012/2010 19/07/2013 6/10/2040 1,535,732.57
  LT 230 kV PASSO FUNDO /NOVA PRATA 2 RS LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2050 1,157,479.29
  LT 230 kV PASSO FUNDO /NOVA PRATA 2 RS LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,560,030.14
  LT 230 kV PASSO FUNDO /NOVA PRATA 2 RS LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,662,323.57
  LT 230 kV PASSO FUNDO /NOVA PRATA 2 RS LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,725,694.51
  LT 230 kV PASSO FUNDO /NOVA PRATA 2 RS LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,198,701.49
  LT 230 kV PASSO FUNDO /VILA MARIA RS LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS RB FT LT 230 kV PASSO FUNDO /VILA MARIA C-1 RS 057/2001 IPCA RBNIA REA 8795/2020     6,351,905.22
  LT 230 kV PASSO FUNDO /VILA MARIA RS LT 230 kV PASSO FUNDO /VILA MARIA C-2 RS RB FT LT 230 kV PASSO FUNDO /VILA MARIA C-2 RS 057/2001 IPCA RBNIA REA 8795/2020     6,375,058.09
  LT 230 kV PASSO FUNDO /XANXERE ESU RS/SC LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,059,045.84
  LT 230 kV PASSO FUNDO /XANXERE ESU RS/SC LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,084,254.17
  LT 230 kV PASSO FUNDO /XANXERE ESU RS/SC LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,085,623.18
  LT 230 kV PATO BRANCO /XANXERE ESU PR/SC LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,064,394.56
  LT 230 kV PATO BRANCO /XANXERE ESU PR/SC LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,089,730.20
  LT 230 kV PONTA GROSSA /PONTA G NORTE PR LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR RB FT LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR 057/2001 IPCA RBNI DSP 1281/2022 1/7/2022 30/06/2056 42,209.94
  LT 230 kV PONTA GROSSA /PONTA G NORTE PR LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR RB FT LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 213,948.65
  LT 230 kV PONTA GROSSA /PONTA G NORTE PR LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR RB FT LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 219,041.25
  LT 230 kV POVO NOVO /QUINTA RS LT 230 kV POVO NOVO /QUINTA C-1 RS RB FT LT 230 kV POVO NOVO /QUINTA C-1 RS 004/2012 IPCA RBL CC 004/2012 9/12/2014 10/5/2042 919,682.47
  LT 230 kV PRE.MEDICI /SANTA CRUZ 1 RS LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038 6,940,355.48
  LT 230 kV S. OSORIO /PATO BRANCO PR LT 230 kV S. OSORIO /PATO BRANCO C-1 PR RB FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,148,636.84
  LT 230 kV S. OSORIO /PATO BRANCO PR LT 230 kV S. OSORIO /PATO BRANCO C-1 PR RB FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,175,977.69
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-1 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 5,197.49
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-2 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 5,197.49
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-3 PR DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 5,213.86
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-4 PR DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 5,213.86
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-3 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 5,337.96
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-4 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 5,337.96
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-5 PR DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 5,351.06
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-6 PR DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 5,351.06
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-5 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 5,478.43
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-6 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 5,478.43
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-5 PR DIT   057/2001 IPCA RCDM REA 4347/2013 6/5/2019 5/5/2049 52,635.64
  LT 230 kV S. OSORIO /U.S.OSORIO PR LT 230 kV S. OSORIO /U.S.OSORIO C-6 PR DIT   057/2001 IPCA RCDM REA 4347/2013 6/5/2019 5/5/2049 52,635.64
  LT 230 kV S. OSORIO /XANXERE ESU PR/SC LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,217,792.62
  LT 230 kV VILA MARIA /NOVA PRATA 2 RS LT 230 kV VILA MARIA /NOVA PRATA 2 C-2 RS RB FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNIA REA 8795/2020     2,883,678.87
  LT 230 kV VILA MARIA /NOVA PRATA 2 RS LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS RB FT LT 230 kV VILA MARIA /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBNIA REA 8795/2020     2,992,936.56
  LT 230 kV VINHEDOS /GARIBALDI 1 RS LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS RB FT LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS 012/2010 IPCA RBNI DSP 1247/2022 1/7/2022 30/06/2057 31,370.87
  LT 230 kV VINHEDOS /GARIBALDI 1 RS LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS RB FT LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS 012/2010 IPCA RBL CC 012/2010 19/07/2013 6/10/2040 1,631,715.86
  LT 500 kV ABDON BATISTA /C.NOVOS SC LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2041 5,074.23
  LT 500 kV ABDON BATISTA /C.NOVOS SC LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBNI REA 5904/2016 1/7/2016 30/06/2044 59,944.39
  LT 500 kV ABDON BATISTA /C.NOVOS SC LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2041 132,314.45
  LT 500 kV ABDON BATISTA /C.NOVOS SC LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC RB FT LT 500 kV ABDON BATISTA /C.NOVOS C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 4/3/2035 13,596,345.58
  LT 500 kV AREIA /BATEIAS PR LT 500 kV AREIA /BATEIAS C-1 PR RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 7,190,589.96
  LT 500 kV AREIA /BATEIAS PR LT 500 kV AREIA /BATEIAS C-1 PR RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,361,746.64
  LT 500 kV AREIA /BATEIAS PR LT 500 kV AREIA /BATEIAS C-1 PR RB FT LT 500 kV AREIA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 11,340,147.05
  LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RMEL REA 7759/2019 27/05/2019 27/05/2050 22,823.20
  LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-1 PR DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 419,097.48
  LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 426,931.08
  LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-1 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 429,073.21
  LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 437,093.27
  LT 500 kV AREIA /BENTO MUNHOZ PR LT 500 kV AREIA /BENTO MUNHOZ C-2 PR DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 673,305.14
  LT 500 kV AREIA /C.NOVOS PR/SC LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,754,430.37
  LT 500 kV AREIA /C.NOVOS PR/SC LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,891,402.32
  LT 500 kV AREIA /C.NOVOS PR/SC LT 500 kV AREIA /C.NOVOS C-1 PR/SC RB FT LT 500 kV AREIA /C.NOVOS C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 9,075,206.19
  LT 500 kV AREIA /CURITIBA PR LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 7,697,162.62
  LT 500 kV AREIA /CURITIBA PR LT 500 kV AREIA /CURITIBA C-1 PR RB FT LT 500 kV AREIA /CURITIBA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,880,377.18
  LT 500 kV AREIA /IVAIPORA PR LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,653,246.40

 

38 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 500 kV AREIA /IVAIPORA PR LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,787,809.88
  LT 500 kV AREIA /IVAIPORA PR LT 500 kV AREIA /IVAIPORA C-1 PR RB FT LT 500 kV AREIA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 8,915,630.81
  LT 500 kV AREIA /SEGREDO PR LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,886,591.47
  LT 500 kV AREIA /SEGREDO PR LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,931,497.76
  LT 500 kV AREIA /SEGREDO PR LT 500 kV AREIA /SEGREDO C-1 PR RB FT LT 500 kV AREIA /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,975,308.67
  LT 500 kV BIGUACU /ABDON BATISTA SC LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2041 29,100.69
  LT 500 kV BIGUACU /ABDON BATISTA SC LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBNI REA 5904/2016 1/7/2016 30/06/2044 60,962.10
  LT 500 kV BIGUACU /ABDON BATISTA SC LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2041 758,823.29
  LT 500 kV BIGUACU /ABDON BATISTA SC LT 500 kV BIGUACU /ABDON BATISTA C-1 SC RB FT LT 500 kV BIGUACU /ABDON BATISTA C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 4/3/2035 77,975,041.86
  LT 500 kV BIGUACU /BLUMENAU SC LT 500 kV BIGUACU /BLUMENAU C-1 SC RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2041 34,174.92
  LT 500 kV BIGUACU /BLUMENAU SC LT 500 kV BIGUACU /BLUMENAU C-1 SC RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RBNI REA 485/2006 25/05/2008 24/05/2041 891,137.73
  LT 500 kV BIGUACU /BLUMENAU SC LT 500 kV BIGUACU /BLUMENAU C-1 SC RB FT LT 500 kV BIGUACU /BLUMENAU C-1 SC 010/2005 IGPM RBL CC 010/2005 17/09/2006 4/3/2035 29,506,335.94
  LT 500 kV BLUMENAU /CURITIBA SC/PR LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,429,246.74
  LT 500 kV BLUMENAU /CURITIBA SC/PR LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,534,675.53
  LT 500 kV BLUMENAU /CURITIBA SC/PR LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR RB FT LT 500 kV BLUMENAU /CURITIBA C-1 SC/PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,985,283.50
  LT 500 kV C.NOVOS /CAXIAS SC/RS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 6,635,710.12
  LT 500 kV C.NOVOS /CAXIAS SC/RS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,793,659.06
  LT 500 kV C.NOVOS /CAXIAS SC/RS LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS RB FT LT 500 kV C.NOVOS /CAXIAS C-1 SC/RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 10,465,056.26
  LT 500 kV C.NOVOS /MACHADINHO SC LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,642,444.33
  LT 500 kV C.NOVOS /MACHADINHO SC LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,681,539.22
  LT 500 kV C.NOVOS /MACHADINHO SC LT 500 kV C.NOVOS /MACHADINHO C-1 SC RB FT LT 500 kV C.NOVOS /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,590,268.72
  LT 500 kV CASCAVEL OEST /IVAIPORA PR LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR RB FT LT 500 kV CASCAVEL OEST /IVAIPORA C-1 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034 35,732,456.15
  LT 500 kV CAXIAS /ITA RS/SC LT 500 kV CAXIAS /ITA C-1 RS/SC RB FT LT 500 kV CAXIAS /ITA C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,554,730.54
  LT 500 kV CURITIBA /BATEIAS PR LT 500 kV CURITIBA /BATEIAS C-1 PR RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,093,439.69
  LT 500 kV CURITIBA /BATEIAS PR LT 500 kV CURITIBA /BATEIAS C-1 PR RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,119,466.69
  LT 500 kV CURITIBA /BATEIAS PR LT 500 kV CURITIBA /BATEIAS C-1 PR RB FT LT 500 kV CURITIBA /BATEIAS C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,724,443.60
  LT 500 kV ITA /MACHADINHO SC LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,581,823.27
  LT 500 kV ITA /MACHADINHO SC LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,643,278.07
  LT 500 kV ITA /MACHADINHO SC LT 500 kV ITA /MACHADINHO C-1 SC RB FT LT 500 kV ITA /MACHADINHO C-1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,071,745.94
  LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 32,248.31
  LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 33,015.91
  LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-3 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-3 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 33,015.91
  LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 33,521.27
  LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 34,319.17
  LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-2 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-2 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 50,858.22
  LT 500 kV IVAIPORA /IVAIPORA PR LT 500 kV IVAIPORA /IVAIPORA C-1 PR RB FT LT 500 kV IVAIPORA /IVAIPORA C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 52,865.78
  LT 500 kV IVAIPORA /LONDRINA ESU PR LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,978,814.87
  LT 500 kV IVAIPORA /LONDRINA ESU PR LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,073,522.08
  LT 500 kV IVAIPORA /LONDRINA ESU PR LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR RB FT LT 500 kV IVAIPORA /LONDRINA ESU C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,274,915.68
  LT 500 kV IVAIPORA /S.SANTIAGO PR LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,403,550.47
  LT 500 kV IVAIPORA /S.SANTIAGO PR LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,532,170.47
  LT 500 kV IVAIPORA /S.SANTIAGO PR LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 8,521,839.96
  LT 500 kV IVAIPORA /S.SANTIAGO PR LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034 32,663,901.93
  LT 500 kV S.SANTIAGO /ITA PR/SC LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 6,097,150.27
  LT 500 kV S.SANTIAGO /ITA PR/SC LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,242,279.94
  LT 500 kV S.SANTIAGO /ITA PR/SC LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 9,615,703.44
  LT 500 kV S.SANTIAGO /ITA PR/SC LT 500 kV S.SANTIAGO /ITA C-2 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC 004/2012 IPCA RBL CC 004/2012 4/2/2014 10/5/2042 21,275,371.77
  LT 500 kV S.SANTIAGO /SEGREDO PR LT 500 kV S.SANTIAGO /SEGREDO C-1 PR RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,987,775.44
  LT 500 kV S.SANTIAGO /SEGREDO PR LT 500 kV S.SANTIAGO /SEGREDO C-1 PR RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,035,090.20
  LT 500 kV S.SANTIAGO /SEGREDO PR LT 500 kV S.SANTIAGO /SEGREDO C-1 PR RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,134,884.04
  LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-1 PR DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 26,732.15
  LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-1 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,368.45
  LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-2 PR DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 28,005.11
  LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-2 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,671.71
  LT 500 kV S.SANTIAGO /U.S.SANTIAGO PR LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-2 PR DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 44,166.35
  LT 525 kV C.NOVOS /NOVA STA RITA SC/RS LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 44,432,617.99
  LT 525 kV CAXIAS /GRAVATAI RS LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,568,767.27
  LT 525 kV CAXIAS /GRAVATAI RS LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,629,911.30
  LT 525 kV CAXIAS /GRAVATAI RS LT 525 kV CAXIAS /GRAVATAI C-1 RS RB FT LT 525 kV CAXIAS /GRAVATAI C-1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,051,155.57
  LT 525 kV GRAVATAI /NOVA STA RITA RS LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,042,292.82
  LT 525 kV GRAVATAI /NOVA STA RITA RS LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,067,102.38
  LT 525 kV GRAVATAI /NOVA STA RITA RS LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,643,780.82
  LT 525 kV ITA /NOVA STA RITA SC/RS LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 10,275,069.09
  LT 525 kV ITA /NOVA STA RITA SC/RS LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,519,645.22
  LT 525 kV ITA /NOVA STA RITA SC/RS LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 16,204,622.29
  LT 525 kV ITA /NOVA STA RITA SC/RS LT 525 kV ITA /NOVA STA RITA C-2 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBL CC 004/2012 6/8/2014 10/5/2042 34,152,571.65
  LT 525 kV MARMELEIRO /STA V.PALMAR RS LT 525 kV MARMELEIRO /STA V.PALMAR C-1 RS RB FT LT 525 kV MARMELEIRO /STA V.PALMAR C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 7,119,063.27
  LT 525 kV NOVA STA RITA /POVO NOVO RS LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS RB FT LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS 020/2012 IPCA RBL CC 020/2012 24/03/2015 27/08/2042 38,470,324.07
  LT 525 kV POVO NOVO /MARMELEIRO RS LT 525 kV POVO NOVO /MARMELEIRO C-1 RS RB FT LT 525 kV POVO NOVO /MARMELEIRO C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 22,263,048.59
  MACAMBARA MC 230 kV RTL 230 kV 30 Mvar MACAMBARA RT2 RS RB FT LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS 007/2014 IPCA RBL CC 007/2014 6/12/2019 29/01/2044 171,633.88
  MACAMBARA RTL 230 kV 30 Mvar MACAMBARA RT2 RS RB FT LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS 007/2014 IPCA RBL CC 007/2014 6/12/2019 29/01/2044 421,233.48
  MACAMBARA EL 230 kV MACAMBARA LT 230 kV MACAMBARA /SANTO ANGELO C-1 RS RB FT LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS 007/2014 IPCA RBL CC 007/2014 6/12/2019 29/01/2044 593,991.38
  MACHADINHO MG 500 kV MACHADINHO MG1 SC RB FT MG 500 kV MACHADINHO MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 605,097.71
  MARINGA EL 230 kV MARINGA LT 230 kV LONDRINA ESU /MARINGA C-1 PR RB FT LT 230 kV LONDRINA ESU /MARINGA C-1 PR 057/2001 IPCA RMEL REN 643/2014 31/12/2016 30/12/2045 1,113.11
  MARINGA EL 230 kV MARINGA LT 230 kV LONDRINA ESU /MARINGA C-1 PR RB FT LT 230 kV LONDRINA ESU /MARINGA C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  MARMELEIRO RTL 525 kV 33 Mvar MARMELEIRO RTR1 RS RB FT RTL 525 kV 33 Mvar MARMELEIRO RTR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 590,334.39
  MARMELEIRO MC 525 kV RTL 525 kV 100 Mvar MARMELEIRO RT1 RS RB FT LT 525 kV POVO NOVO /MARMELEIRO C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 662,903.37
  MARMELEIRO MC 525 kV RTB 525 kV 100 Mvar MARMELEIRO RT2 RS RB FT RTB 525 kV 100 Mvar MARMELEIRO RT2 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,027,931.34
  MARMELEIRO IB 525 kV MG 525 kV MARMELEIRO MG1 RS IB1 RB FT MG 525 kV MARMELEIRO MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,167,378.04
  MARMELEIRO IB 525 kV MG 525 kV MARMELEIRO MG1 RS IB2 RB FT MG 525 kV MARMELEIRO MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,167,378.04
  MARMELEIRO EL 525 kV MARMELEIRO LT 525 kV MARMELEIRO /STA V.PALMAR C-1 RS RB FT LT 525 kV MARMELEIRO /STA V.PALMAR C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,239,980.39
  MARMELEIRO EL 525 kV MARMELEIRO LT 525 kV POVO NOVO /MARMELEIRO C-1 RS RB FT LT 525 kV POVO NOVO /MARMELEIRO C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,239,980.39
  MARMELEIRO RTB 525 kV 100 Mvar MARMELEIRO RT2 RS RB FT RTB 525 kV 100 Mvar MARMELEIRO RT2 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,771,005.12
  MARMELEIRO RTL 525 kV 100 Mvar MARMELEIRO RT1 RS RB FT LT 525 kV POVO NOVO /MARMELEIRO C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,771,005.12
  MARMELEIRO MG 525 kV MARMELEIRO MG1 RS RB FT MG 525 kV MARMELEIRO MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,889,076.71
  MARMELEIRO MC 525 kV CS 200/-200 Mvar MARMELEIRO CS1 RS RB FT CS 200/-200 Mvar MARMELEIRO CS1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 4,040,758.32

 

39 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MARMELEIRO CS 200/-200 Mvar MARMELEIRO CS1 RS RB FT CS 200/-200 Mvar MARMELEIRO CS1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 14,204,334.30
  MISSOES MC 230 kV TR 230/69 kV MISSOES TR1 RS RBF FT TR 230/69 kV MISSOES TR1 RS 005/2009 IPCA RMEL REN 643/2014 25/11/2015 24/11/2047 432.31
  MISSOES MC 230 kV TR 230/69 kV MISSOES TR2 RS RBF FT TR 230/69 kV MISSOES TR2 RS 005/2009 IPCA RMEL REN 643/2014 25/11/2015 24/11/2047 432.31
  MISSOES MC 230 kV TR 230/69 kV MISSOES TR3 RS RBF FT TR 230/69 kV MISSOES TR3 RS 005/2009 IPCA RMEL REN 643/2014 25/11/2015 24/11/2047 432.31
  MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RMEL REN 643/2014 25/11/2015 24/11/2047 432.31
  MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RMEL REN 643/2014 25/11/2015 24/11/2047 432.31
  MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RBNI REA 5861/2016 10/5/2019 9/5/2036 25,518.55
  MISSOES EL 69 kV MISSOES  DIST1 DIT   005/2009 IPCA RPEC CC 005/2009 19/06/2010 28/01/2039 43,955.98
  MISSOES IB 69 kV MG 230 kV MISSOES MG1 RS IB1 DIT   005/2009 IPCA RPEC CC 005/2009 19/06/2010 28/01/2039 52,277.68
  MISSOES MC 69 kV TR 230/69 kV MISSOES TR1 RS RBF FT TR 230/69 kV MISSOES TR1 RS 005/2009 IPCA RBL CC 005/2009 28/01/2009 28/01/2039 86,296.15
  MISSOES MC 69 kV TR 230/69 kV MISSOES TR2 RS RBF FT TR 230/69 kV MISSOES TR2 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 87,296.10
  MISSOES MC 69 kV TR 230/69 kV MISSOES TR3 RS RBF FT TR 230/69 kV MISSOES TR3 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 87,296.10
  MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RBL CC 005/2009 28/01/2009 28/01/2039 132,278.82
  MISSOES MC 230 kV TR 230/69 kV MISSOES TR1 RS RBF FT TR 230/69 kV MISSOES TR1 RS 005/2009 IPCA RBL CC 005/2009 28/01/2009 28/01/2039 216,620.96
  MISSOES IB 230 kV MG 230 kV MISSOES MG1 RS IB1 RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 264,115.42
  MISSOES TR 230/69 kV MISSOES TR2 RS RBF FT TR 230/69 kV MISSOES TR2 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 471,894.66
  MISSOES TR 230/69 kV MISSOES TR3 RS RBF FT TR 230/69 kV MISSOES TR3 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 471,894.66
  MISSOES MC 230 kV TR 230/69 kV MISSOES TR2 RS RBF FT TR 230/69 kV MISSOES TR2 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 477,651.85
  MISSOES MC 230 kV TR 230/69 kV MISSOES TR3 RS RBF FT TR 230/69 kV MISSOES TR3 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 477,651.85
  MISSOES TR 230/69 kV MISSOES TR1 RS RBF FT TR 230/69 kV MISSOES TR1 RS 005/2009 IPCA RBL CC 005/2009 28/01/2009 28/01/2039 716,312.40
  MISSOES MG 230 kV MISSOES MG1 RS RB FT MG 230 kV MISSOES MG1 RS 005/2009 IPCA RBL CC 005/2009 19/06/2010 28/01/2039 3,005,804.40
  MONTE CLARO EL 230 kV MONTE CLARO LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2043 27,669.20
  MONTE CLARO IB 230 kV MG 230 kV MONTE CLARO MG1 RS IB1 RB FT MG 230 kV MONTE CLARO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 86,880.35
  MONTE CLARO EL 230 kV MONTE CLARO LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS RB FT LT 230 kV FARROUPILHA /MONTE CLARO C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  MONTE CLARO EL 230 kV MONTE CLARO LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  MONTE CLARO EL 230 kV MONTE CLARO LT 230 kV MONTE CLARO /VINHEDOS C-1 RS RB FT LT 230 kV MONTE CLARO /VINHEDOS C-1 RS 012/2010 IPCA RBL CC 012/2010 19/07/2013 6/10/2040 758,780.15
  N. PETROPOLIS 2 IB 69 kV MG 230 kV N. PETROPOLIS 2 MG1 RS IB1 DIT   011/2010 IPCA RPEC CC 011/2010 6/10/2010 6/10/2040 75,608.94
  N. PETROPOLIS 2 EL 69 kV N. PETROPOLIS 2  DIST1 DIT   011/2010 IPCA RPEC CC 011/2010 6/10/2010 6/10/2040 132,298.10
  N. PETROPOLIS 2 EL 69 kV N. PETROPOLIS 2  DIST2 DIT   011/2010 IPCA RPEC CC 011/2010 6/10/2010 6/10/2040 132,298.10
  N. PETROPOLIS 2 MC 69 kV TR 230/69 kV N. PETROPOLIS 2 TR1 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 169,941.84
  N. PETROPOLIS 2 MG 230 kV N. PETROPOLIS 2 MG1 RS RB FT MG 230 kV N. PETROPOLIS 2 MG1 RS 011/2010 IPCA RBNI REA 6042/2016 22/09/2018 22/09/2049 185,456.39
  N. PETROPOLIS 2 IB 230 kV MG 230 kV N. PETROPOLIS 2 MG1 RS IB1 RB FT MG 230 kV N. PETROPOLIS 2 MG1 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 315,440.85
  N. PETROPOLIS 2 MC 69 kV TR 230/69 kV N. PETROPOLIS 2 TR2 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR2 RS 011/2010 IPCA RBNI REA 6042/2016 22/09/2018 22/09/2040 391,010.27
  N. PETROPOLIS 2 MC 230 kV TR 230/69 kV N. PETROPOLIS 2 TR1 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 427,308.22
  N. PETROPOLIS 2 MC 230 kV TR 230/69 kV N. PETROPOLIS 2 TR2 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR2 RS 011/2010 IPCA RBNI REA 6042/2016 22/09/2018 22/09/2041 1,027,551.30
  N. PETROPOLIS 2 TR 230/69 kV N. PETROPOLIS 2 TR1 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR1 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 1,050,529.93
  N. PETROPOLIS 2 MG 230 kV N. PETROPOLIS 2 MG1 RS RB FT MG 230 kV N. PETROPOLIS 2 MG1 RS 011/2010 IPCA RBL CC 011/2010 6/10/2010 6/10/2040 1,268,197.18
  N. PETROPOLIS 2 TR 230/69 kV N. PETROPOLIS 2 TR2 RS RBF FT TR 230/69 kV N. PETROPOLIS 2 TR2 RS 011/2010 IPCA RBNI REA 6042/2016 22/09/2018 22/09/2052 1,344,168.45
  NOVA ANDRADINA MG 138 kV NOVA ANDRADINA MG1 MS DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2042 298,464.99
  NOVA ANDRADINA EL 138 kV NOVA ANDRADINA LT 138 kV IVINHEMA 2 /NOVA ANDRADINA C-1 MS DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2046 729,596.46
  NOVA ANDRADINA EL 138 kV NOVA ANDRADINA LT 138 kV NOVA ANDRADINA /PORTO PRIMAVERA C-1 MS/SP DIT   057/2001 IPCA RCDM REA 4543/2014 20/07/2016 19/07/2045 747,796.76
  NOVA PRATA 2 MG 230 kV NOVA PRATA 2 MG2 RS RB FT MG 230 kV NOVA PRATA 2 MG2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2041 233,861.88
  NOVA PRATA 2 EL 230 kV NOVA PRATA 2 LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV MONTE CLARO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2045 1,136,099.50
  NOVA PRATA 2 EL 230 kV NOVA PRATA 2 LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2045 1,136,099.50
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR1 RS RB FT TR 525/230 kV NOVA STA RITA TR1 RS 057/2001 IPCA RMEL REN 443/2011 3/9/2015 2/9/2050 8.75
  NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS 057/2001 IPCA RMEL REN 443/2011 29/10/2015 28/10/2051 76.52
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR4 RS RB FT TR 525/230 kV NOVA STA RITA TR4 RS 057/2001 IPCA RMEL REN 443/2011 29/07/2015 28/07/2050 181.93
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR2 RS RB FT TR 525/230 kV NOVA STA RITA TR2 RS 057/2001 IPCA RMEL REN 443/2011 16/06/2017 15/06/2052 190.51
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR3 RS RB FT TR 525/230 kV NOVA STA RITA TR3 RS 057/2001 IPCA RMEL REN 443/2011 5/6/2016 4/6/2051 229.57
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2043 400.77
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RMEL REN 443/2011 8/10/2016 7/10/2043 490.56
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RMEL REN 443/2011 30/08/2015 29/08/2042 577.17
  NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS 005/2006 IPCA RMEL REN 443/2011 14/06/2017 13/06/2053 690.62
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 10,783.68
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  NOVA STA RITA MG 525 kV NOVA STA RITA MG1 RS RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 12,742.01
  NOVA STA RITA MG 525 kV NOVA STA RITA MG1 RS RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RMEL REN 643/2014 15/06/2014 14/06/2031 24,703.75
  NOVA STA RITA MG 525 kV NOVA STA RITA MG1 RS RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RMEL REN 643/2014 5/10/2014 4/10/2031 24,762.23
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBNI REA 5861/2016 26/04/2020 25/04/2034 28,459.58
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBNI REA 8314/2019 26/04/2020 25/04/2034 28,459.58
  NOVA STA RITA MG 525 kV NOVA STA RITA MG1 RS RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036 38,115.93
  NOVA STA RITA IB 230 kV MG 525 kV NOVA STA RITA MG1 RS IB5 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  NOVA STA RITA MC 230 kV TR 525/230 kV NOVA STA RITA TR2 RS RB FT TR 525/230 kV NOVA STA RITA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  NOVA STA RITA MC 230 kV TR 525/230 kV NOVA STA RITA TR3 RS RB FT TR 525/230 kV NOVA STA RITA TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  NOVA STA RITA MC 230 kV TR 525/230 kV NOVA STA RITA TR4 RS RB FT TR 525/230 kV NOVA STA RITA TR4 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  NOVA STA RITA MC 525 kV RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 188,347.73
  NOVA STA RITA MC 525 kV TR 525/230 kV NOVA STA RITA TR2 RS RB FT TR 525/230 kV NOVA STA RITA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  NOVA STA RITA MC 525 kV TR 525/230 kV NOVA STA RITA TR3 RS RB FT TR 525/230 kV NOVA STA RITA TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  NOVA STA RITA MC 525 kV TR 525/230 kV NOVA STA RITA TR4 RS RB FT TR 525/230 kV NOVA STA RITA TR4 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB1 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB2 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB3 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB4 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS RB FT LT 525 kV GRAVATAI /NOVA STA RITA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-1 SC/RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TRR1 RS RB FT TR 525/230 kV NOVA STA RITA TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 483,714.95
  NOVA STA RITA EL 230 kV NOVA STA RITA LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS RB FT LT 230 kV CAMAQUA 3 /NOVA STA RITA C-1 RS 004/2012 IPCA RBL CC 004/2012 9/12/2014 10/5/2042 507,785.06
  NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,458.98
  NOVA STA RITA MC 525 kV RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS 004/2012 IPCA RBL CC 004/2012 6/8/2014 10/5/2042 593,555.21
  NOVA STA RITA RTL 525 kV 50 Mvar NOVA STA RITA RTR3 RS RB FT RTL 525 kV 50 Mvar NOVA STA RITA RTR3 RS 004/2012 IPCA RBL CC 004/2012 6/8/2014 10/5/2042 612,677.82
  NOVA STA RITA MC 525 kV RTL 525 kV 150 Mvar NOVA STA RITA RT4 RS RB FT LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS 020/2012 IPCA RBL CC 020/2012 24/03/2015 27/08/2042 662,903.37
  NOVA STA RITA RTL 525 kV 50 Mvar NOVA STA RITA RTR4 RS RB FT RTL 525 kV 50 Mvar NOVA STA RITA RTR4 RS 020/2012 IPCA RBL CC 020/2012 24/03/2015 27/08/2042 677,395.57
  NOVA STA RITA RTL 525 kV 50 Mvar NOVA STA RITA RTR2 RS RB FT RTL 525 kV 50 Mvar NOVA STA RITA RTR2 RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 785,227.87
  NOVA STA RITA MC 230 kV TR 525/230 kV NOVA STA RITA TR1 RS RB FT TR 525/230 kV NOVA STA RITA TR1 RS 057/2001 IPCA RBNI REA 3339/2012 22/12/2013 21/12/2043 979,051.27
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV ITA /NOVA STA RITA C-2 SC/RS RB FT LT 525 kV ITA /NOVA STA RITA C-2 SC/RS 004/2012 IPCA RBL CC 004/2012 6/8/2014 10/5/2042 1,109,596.32

 

40 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG2 RS IB7 RB FT MG 525 kV NOVA STA RITA MG2 RS 020/2012 IPCA RBL CC 020/2012 24/03/2015 27/08/2042 1,167,378.04
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS RB FT LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS 020/2012 IPCA RBL CC 020/2012 24/03/2015 27/08/2042 1,239,980.39
  NOVA STA RITA MG 525 kV NOVA STA RITA MG1 RS RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,297,849.23
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR2 RS RB FT TR 525/230 kV NOVA STA RITA TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR3 RS RB FT TR 525/230 kV NOVA STA RITA TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR4 RS RB FT TR 525/230 kV NOVA STA RITA TR4 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  NOVA STA RITA IB 525 kV MG 525 kV NOVA STA RITA MG1 RS IB6 RB FT MG 525 kV NOVA STA RITA MG1 RS 057/2001 IPCA RBNI REA 3339/2012 22/12/2013 21/12/2044 1,470,820.96
  NOVA STA RITA MC 525 kV RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 1,545,978.80
  NOVA STA RITA MC 525 kV TR 525/230 kV NOVA STA RITA TR1 RS RB FT TR 525/230 kV NOVA STA RITA TR1 RS 057/2001 IPCA RBNI REA 3339/2012 22/12/2013 21/12/2044 1,572,191.08
  NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT3 RS 004/2012 IPCA RBL CC 004/2012 6/8/2014 10/5/2042 1,838,031.89
  NOVA STA RITA EL 525 kV NOVA STA RITA LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS RB FT LT 525 kV C.NOVOS /NOVA STA RITA C-1 SC/RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 1,893,000.74
  NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT4 RS RB FT LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS 020/2012 IPCA RBL CC 020/2012 24/03/2015 27/08/2042 2,032,186.71
  NOVA STA RITA RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS RB FT RTL 525 kV 150 Mvar NOVA STA RITA RT1 RS 005/2006 IPCA RBL CC 005/2006 27/04/2006 27/04/2036 2,355,686.41
  NOVA STA RITA TR 525/230 kV NOVA STA RITA TR1 RS RB FT TR 525/230 kV NOVA STA RITA TR1 RS 057/2001 IPCA RBNI REA 3339/2012 22/12/2013 21/12/2048 5,111,850.28
  OSORIO 2 MG 230 kV OSORIO 2 MG2 RS RB FT MG 230 kV OSORIO 2 MG2 RS 057/2001 IPCA RBNI REA 5861/2016 7/5/2019 6/5/2036 25,147.96
  OSORIO 2 EL 230 kV OSORIO 2 LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS RB FT LT 230 kV ATLANTIDA 2 /OSORIO 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  OSORIO 2 MG 230 kV OSORIO 2 MG2 RS RB FT MG 230 kV OSORIO 2 MG2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 257,609.13
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR4 SC RBF FT TR 230/138 kV PALHOCA ESU TR4 SC 057/2001 IPCA RBNI REA 7529/2018 3/12/2021 3/12/2036 4,981.10
  PALHOCA ESU MG 230 kV PALHOCA ESU MG1 SC RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RBNI DSP 4033/2021 22/12/2021 21/12/2036 5,332.27
  PALHOCA ESU MG 230 kV PALHOCA ESU MG1 SC RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 11/4/2013 10/4/2030 10,650.06
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RMEL REN 643/2014 28/08/2013 27/08/2036 11,105.77
  PALHOCA ESU MG 230 kV PALHOCA ESU MG1 SC RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 15/09/2014 14/09/2031 11,450.74
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RMEL REN 643/2014 9/10/2013 8/10/2036 12,185.60
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNI REA 5484/2015 28/10/2015 27/10/2043 19,619.62
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNI REA 5484/2015 28/10/2015 27/10/2043 19,692.22
  PALHOCA ESU EL 230 kV PALHOCA ESU LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RMEL REN 643/2014 9/10/2013 8/10/2036 19,797.43
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV PAL.PINHEIRA /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RCDM REA 2879/2011 6/2/2016 5/2/2044 28,271.80
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNI REA 5484/2015 8/8/2017 7/8/2047 33,615.08
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBNI REA 5484/2015 8/8/2017 7/8/2047 33,615.08
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNI REA 7529/2018 28/07/2021 28/07/2054 56,818.49
  PALHOCA ESU IB 138 kV MG 230 kV PALHOCA ESU MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,120.84
  PALHOCA ESU IB 138 kV MG 230 kV PALHOCA ESU MG1 SC IB1 DIT   057/2001 IPCA RCDM REA 7529/2018 3/12/2021 3/12/2054 66,828.17
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBNI REA 7529/2018 2/10/2021 2/10/2055 68,923.62
  PALHOCA ESU IB 230 kV MG 230 kV PALHOCA ESU MG1 SC IB1 RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RBNI REA 7529/2018 16/12/2021 16/12/2052 74,142.06
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 82,328.77
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,288.43
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,288.43
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,288.43
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR4 SC RBF FT TR 230/138 kV PALHOCA ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,288.43
  PALHOCA ESU IB 230 kV MG 230 kV PALHOCA ESU MG1 SC IB1 RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBNI REA 7529/2018 20/11/2021 20/11/2053 108,533.67
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 112,593.49
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 112,593.49
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR4 SC RBF FT TR 230/138 kV PALHOCA ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV ILHA CENTRO /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 122,759.97
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV TRINDADE (DIST) /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 122,759.97
  PALHOCA ESU EL 138 kV PALHOCA ESU  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  PALHOCA ESU EL 138 kV PALHOCA ESU  SJS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV FLORIANOPOLIS /PALHOCA ESU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV ILHA CENTRO /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV PAL.PINHEIRA /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV PALHOCA CSC /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV PALHOCA ESU /J.LACERDA-A C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  PALHOCA ESU EL 138 kV PALHOCA ESU LT 138 kV TRINDADE (DIST) /PALHOCA ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  PALHOCA ESU MC 138 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 129,839.19
  PALHOCA ESU MC 230 kV BC 230 kV 50 Mvar PALHOCA ESU BC1 SC RB FT BC 230 kV 50 Mvar PALHOCA ESU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,714.06
  PALHOCA ESU BC 230 kV 50 Mvar PALHOCA ESU BC1 SC RB FT BC 230 kV 50 Mvar PALHOCA ESU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 143,119.56
  PALHOCA ESU EL 230 kV PALHOCA ESU LT 230 kV BIGUACU /PALHOCA ESU C-1 SC RB FT LT 230 kV BIGUACU /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  PALHOCA ESU EL 230 kV PALHOCA ESU LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC RB FT LT 230 kV GASPAR 2 /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  PALHOCA ESU EL 230 kV PALHOCA ESU LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /PALHOCA ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 177,569.12
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNI REA 7529/2018 28/07/2021 28/07/2051 181,456.02
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBNI REA 7529/2018 20/11/2021 20/11/2041 308,132.71
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR4 SC RBF FT TR 230/138 kV PALHOCA ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  PALHOCA ESU MC 230 kV TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBNI REA 7529/2018 2/10/2021 2/10/2042 372,501.72
  PALHOCA ESU MG 230 kV PALHOCA ESU MG1 SC RB FT MG 230 kV PALHOCA ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 502,941.56
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR1 SC RBF FT TR 230/138 kV PALHOCA ESU TR1 SC 057/2001 IPCA RBNI REA 7529/2018 28/07/2021 28/07/2056 1,629,732.25
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR2 SC RBF FT TR 230/138 kV PALHOCA ESU TR2 SC 057/2001 IPCA RBNI REA 7529/2018 2/10/2021 2/10/2056 1,629,732.25
  PALHOCA ESU TR 230/138 kV PALHOCA ESU TR3 SC RBF FT TR 230/138 kV PALHOCA ESU TR3 SC 057/2001 IPCA RBNI REA 7529/2018 20/11/2021 20/11/2056 1,629,732.25
  PASSO FUNDO MC 230 kV TR 230/138 kV PASSO FUNDO TR5 RS RBF FT TR 230/138 kV PASSO FUNDO TR5 RS 057/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2046 244.77
  PASSO FUNDO MC 230 kV TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RMEL REN 643/2014 11/6/2014 10/6/2046 2,474.89
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RMEL REN 643/2014 6/12/2014 5/12/2043 2,531.67
  PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RMEL REN 643/2014 15/09/2014 14/09/2034 2,617.10
  PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RMEL REN 643/2014 21/09/2015 20/09/2035 2,729.79
  PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RMEL REN 643/2014 23/12/2014 22/12/2031 23,205.19
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBNI REA 3161/2011 25/09/2015 24/09/2043 27,669.20
  PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RBNI REA 5861/2016 24/05/2019 23/05/2036 41,400.96
  PASSO FUNDO IB 138 kV MG 230 kV PASSO FUNDO MG1 RS IB1 DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,606.81
  PASSO FUNDO IB 138 kV MG 230 kV PASSO FUNDO MG1 RS IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,120.84
  PASSO FUNDO EL 138 kV PASSO FUNDO  DIST1 DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 82,328.77
  PASSO FUNDO MC 138 kV TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 82,328.77
  PASSO FUNDO EL 138 kV PASSO FUNDO  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 84,288.43

 

41 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  PASSO FUNDO MC 138 kV TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,288.43
  PASSO FUNDO MC 138 kV TR 230/138 kV PASSO FUNDO TR5 RS RBF FT TR 230/138 kV PASSO FUNDO TR5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 84,288.43
  PASSO FUNDO IB 230 kV MG 230 kV PASSO FUNDO MG1 RS IB1 RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 97,495.85
  PASSO FUNDO IB 230 kV MG 230 kV PASSO FUNDO MG1 RS IB1 RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  PASSO FUNDO MC 230 kV TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 118,655.32
  PASSO FUNDO MC 230 kV TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 121,479.66
  PASSO FUNDO MC 230 kV TR 230/138 kV PASSO FUNDO TR5 RS RBF FT TR 230/138 kV PASSO FUNDO TR5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 121,479.66
  PASSO FUNDO EL 138 kV PASSO FUNDO LT 138 kV EREXIM 1 /PASSO FUNDO C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 125,682.01
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 165,485.86
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /GUARITA C-1 RS RB FT LT 230 kV PASSO FUNDO /GUARITA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS RB FT LT 230 kV PASSO FUNDO /NOVA PRATA 2 C-2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /SANTA MARTA C-1 RS RB FT LT 230 kV PASSO FUNDO /SANTA MARTA C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /U.PASSO FUNDO C-1 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /U.PASSO FUNDO C-2 RS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  PASSO FUNDO EL 230 kV PASSO FUNDO LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  PASSO FUNDO TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 372,182.10
  PASSO FUNDO TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 381,041.11
  PASSO FUNDO TR 230/138 kV PASSO FUNDO TR5 RS RBF FT TR 230/138 kV PASSO FUNDO TR5 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 381,041.11
  PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 459,004.59
  PASSO FUNDO MG 230 kV PASSO FUNDO MG1 RS RB FT MG 230 kV PASSO FUNDO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 469,930.22
  PASSO FUNDO TR  230/138  kV PASSO FUNDO    TR3 RS RBF FT TR  230/138  kV PASSO FUNDO    TR3 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 586,961.54
  PINHALZINHO IB 138 kV MG 230 kV PINHALZINHO MG1 SC IB1 DIT   007/2014 IPCA RPEC CC 007/2014 28/02/2018 29/01/2044 183,132.21
  PINHALZINHO MC 138 kV TR 230/138 kV PINHALZINHO TR1 SC RBF FT TR 230/138 kV PINHALZINHO TR1 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 220,387.70
  PINHALZINHO MC 138 kV TR 230/138 kV PINHALZINHO TR2 SC RBF FT TR 230/138 kV PINHALZINHO TR2 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 220,387.70
  PINHALZINHO MC 138 kV TR 230/138 kV PINHALZINHO TR3 SC RBF FT TR 230/138 kV PINHALZINHO TR3 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 220,387.70
  PINHALZINHO IB 230 kV MG 230 kV PINHALZINHO MG1 SC IB1 RB FT MG 230 kV PINHALZINHO MG1 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 247,296.47
  PINHALZINHO MC 230 kV TR 230/138 kV PINHALZINHO TR1 SC RBF FT TR 230/138 kV PINHALZINHO TR1 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 286,753.63
  PINHALZINHO MC 230 kV TR 230/138 kV PINHALZINHO TR2 SC RBF FT TR 230/138 kV PINHALZINHO TR2 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 286,753.63
  PINHALZINHO MC 230 kV TR 230/138 kV PINHALZINHO TR3 SC RBF FT TR 230/138 kV PINHALZINHO TR3 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 286,753.63
  PINHALZINHO EL 138 kV PINHALZINHO  DIST1 DIT   007/2014 IPCA RPEC CC 007/2014 28/02/2018 29/01/2044 326,307.28
  PINHALZINHO EL 138 kV PINHALZINHO  DIST2 DIT   007/2014 IPCA RPEC CC 007/2014 28/02/2018 29/01/2044 326,307.28
  PINHALZINHO EL 138 kV PINHALZINHO  DIST3 DIT   007/2014 IPCA RPEC CC 007/2014 28/02/2018 29/01/2044 326,307.28
  PINHALZINHO EL 138 kV PINHALZINHO  DIST4 DIT   007/2014 IPCA RPEC CC 007/2014 28/02/2018 29/01/2044 326,307.28
  PINHALZINHO EL 230 kV PINHALZINHO LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-1 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 407,275.41
  PINHALZINHO EL 230 kV PINHALZINHO LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /PINHALZINHO C-2 RS/SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 440,505.99
  PINHALZINHO TR 230/138 kV PINHALZINHO TR1 SC RBF FT TR 230/138 kV PINHALZINHO TR1 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 792,472.71
  PINHALZINHO TR 230/138 kV PINHALZINHO TR2 SC RBF FT TR 230/138 kV PINHALZINHO TR2 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 792,472.71
  PINHALZINHO TR 230/138 kV PINHALZINHO TR3 SC RBF FT TR 230/138 kV PINHALZINHO TR3 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 792,472.71
  PINHALZINHO MG 230 kV PINHALZINHO MG1 SC RB FT MG 230 kV PINHALZINHO MG1 SC 007/2014 IPCA RBL CC 007/2014 28/02/2018 29/01/2044 1,765,518.83
  PONTA GROSSA MG 230 kV PONTA GROSSA MG3 PR RB FT MG 230 kV PONTA GROSSA MG3 PR 057/2001 IPCA RBNI DSP 1281/2022 1/7/2022 30/06/2053 40,384.12
  PONTA GROSSA EL 230 kV PONTA GROSSA LT 230 kV AREIA /PONTA GROSSA C-1 PR RB FT LT 230 kV AREIA /PONTA GROSSA C-1 PR 057/2001 IPCA RBNI DSP 1281/2022 1/7/2022 30/06/2051 205,138.70
  PONTA GROSSA EL 230 kV PONTA GROSSA LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR RB FT LT 230 kV PONTA GROSSA /PONTA G NORTE C-1 PR 057/2001 IPCA RBNI DSP 1281/2022 1/7/2022 30/06/2051 205,138.70
  POVO NOVO MG 525 kV POVO NOVO MG1 RS RB FT MG 525 kV POVO NOVO MG1 RS 020/2012 IPCA RBNI DSP 1430/2021 10/1/2022 9/1/2037 16,810.94
  POVO NOVO MG 230 kV POVO NOVO MG5 RS RB FT MG 230 kV POVO NOVO MG5 RS 004/2012 IPCA RBNI DSP 1446/2022 1/7/2022 30/06/2053 41,477.86
  POVO NOVO EL 230 kV POVO NOVO LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS RB FT LT 230 kV CAMAQUA 3 /POVO NOVO C-1 RS 004/2012 IPCA RBNI DSP 1446/2022 1/7/2022 30/06/2050 201,590.49
  POVO NOVO EL 230 kV POVO NOVO LT 230 kV POVO NOVO /QUINTA C-1 RS RB FT LT 230 kV POVO NOVO /QUINTA C-1 RS 004/2012 IPCA RBNI DSP 1446/2022 1/7/2022 30/06/2050 201,590.49
  POVO NOVO MG 230 kV POVO NOVO MG2 RS RB FT MG 230 kV POVO NOVO MG2 RS 020/2012 IPCA RBNI REA 4916/2014 22/01/2018 22/01/2042 346,545.26
  POVO NOVO IB 230 kV MG 525 kV POVO NOVO MG1 RS IB1 RB FT MG 525 kV POVO NOVO MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 353,924.22
  POVO NOVO MC 230 kV TR 525/230 kV POVO NOVO TR1 RS RB FT TR 525/230 kV POVO NOVO TR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 408,302.36
  POVO NOVO RTL 525 kV 16,67 Mvar POVO NOVO RTR2 RS RB FT RTL 525 kV 16,67 Mvar POVO NOVO RTR2 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 442,512.75
  POVO NOVO MC 525 kV RTL 525 kV 150 Mvar POVO NOVO RT1 RS RB FT LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 662,903.37
  POVO NOVO RTL 525 kV 50 Mvar POVO NOVO RTR1 RS RB FT RTL 525 kV 50 Mvar POVO NOVO RTR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 677,395.57
  POVO NOVO MC 525 kV RTL 525 kV 50 Mvar POVO NOVO RT2 RS RB FT RTL 525 kV 50 Mvar POVO NOVO RT2 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,027,931.34
  POVO NOVO MC 525 kV TR 525/230 kV POVO NOVO TR1 RS RB FT TR 525/230 kV POVO NOVO TR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,098,971.00
  POVO NOVO IB 525 kV MG 525 kV POVO NOVO MG1 RS IB1 RB FT MG 525 kV POVO NOVO MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,167,378.04
  POVO NOVO IB 525 kV MG 525 kV POVO NOVO MG1 RS IB2 RB FT MG 525 kV POVO NOVO MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,167,378.04
  POVO NOVO EL 525 kV POVO NOVO LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS RB FT LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS 020/2012 IPCA RBL CC 020/2012 24/03/2015 27/08/2042 1,239,980.39
  POVO NOVO EL 525 kV POVO NOVO LT 525 kV POVO NOVO /MARMELEIRO C-1 RS RB FT LT 525 kV POVO NOVO /MARMELEIRO C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,239,980.39
  POVO NOVO RTL 525 kV 50 Mvar POVO NOVO RT2 RS RB FT RTL 525 kV 50 Mvar POVO NOVO RT2 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,327,538.26
  POVO NOVO MC 230 kV TR 500/230 kV POVO NOVO TR2 RS RB FT TR 525/230 kV POVO NOVO TR2 RS 020/2012 IPCA RBNI REA 4916/2014 22/01/2018 22/01/2046 1,501,309.52
  POVO NOVO TR 525/230 kV POVO NOVO TRR1 RS RB FT TR 525/230 kV POVO NOVO TRR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,795,915.92
  POVO NOVO MC 500 kV TR 500/230 kV POVO NOVO TR2 RS RB FT TR 525/230 kV POVO NOVO TR2 RS 020/2012 IPCA RBNI REA 4916/2014 22/01/2018 22/01/2049 1,797,924.94
  POVO NOVO MG 525 kV POVO NOVO MG1 RS RB FT MG 525 kV POVO NOVO MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,976,870.16
  POVO NOVO RTL 525 kV 150 Mvar POVO NOVO RT1 RS RB FT LT 525 kV NOVA STA RITA /POVO NOVO C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 2,032,186.71
  POVO NOVO TR 525/230 kV POVO NOVO TR1 RS RB FT TR 525/230 kV POVO NOVO TR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 5,387,749.74
  POVO NOVO TR 500/230 kV POVO NOVO TR2 RS RB FT TR 525/230 kV POVO NOVO TR2 RS 020/2012 IPCA RBNI REA 4916/2014 22/01/2018 22/01/2053 5,449,810.00
  PRE.MEDICI RTL 230 kV 10 Mvar PRE.MEDICI RT2 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038 71,975.22
  PRE.MEDICI MC 230 kV RTL 230 kV 10 Mvar PRE.MEDICI RT2 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038 79,804.13
  PRE.MEDICI EL 230 kV PRE.MEDICI LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038 334,106.31
  QUINTA EL 230 kV QUINTA LT 230 kV POVO NOVO /QUINTA C-1 RS RB FT LT 230 kV POVO NOVO /QUINTA C-1 RS 004/2012 IPCA RBNI DSP 1430/2021 27/05/2021 26/05/2036 3,794.38
  QUINTA EL 230 kV QUINTA LT 230 kV POVO NOVO /QUINTA C-1 RS RB FT LT 230 kV POVO NOVO /QUINTA C-1 RS 004/2012 IPCA RBL CC 004/2012 9/12/2014 10/5/2042 507,785.06
  S. OSORIO MC 230 kV TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RMEL REN 643/2014 14/08/2014 13/08/2046 2,487.04
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 20/07/2014 19/07/2043 2,502.56
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV CASCAVEL /S. OSORIO C-1 PR RB FT LT 230 kV CASCAVEL /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 17/08/2014 16/08/2043 2,508.42
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR RB FT LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 23/11/2014 22/11/2043 2,528.96
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 6/12/2014 5/12/2043 2,531.67
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 6/12/2014 5/12/2043 2,531.67
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 14/12/2014 13/12/2043 2,533.34
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /PATO BRANCO C-1 PR RB FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR 057/2001 IPCA RMEL REN 643/2014 14/12/2014 13/12/2043 2,533.34
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 13/03/2016 12/3/2045 2,628.66
  S. OSORIO MG 230 kV S. OSORIO MG1 PR RB FT MG 230 kV S. OSORIO MG1 PR 057/2001 IPCA RMEL REN 643/2014 9/12/2014 8/12/2034 2,642.92
  S. OSORIO MC 69 kV TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RMEL REN 643/2014 27/08/2013 26/08/2036 6,258.04
  S. OSORIO MC 69 kV TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RMEL REN 643/2014 3/9/2013 2/9/2036 6,262.56
  S. OSORIO MC 230 kV TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RMEL REN 643/2014 10/7/2013 9/7/2036 19,612.50

 

42 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  S. OSORIO MG 230 kV S. OSORIO MG1 PR RB FT MG 230 kV S. OSORIO MG1 PR 057/2001 IPCA RMEL REN 643/2014 8/10/2013 7/10/2030 21,852.31
  S. OSORIO MC 230 kV TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RCDM REA 4347/2013 20/05/2015 19/05/2045 34,506.29
  S. OSORIO EL 13,8 kV S. OSORIO  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 37,467.66
  S. OSORIO MC 69 kV TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,119.29
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 6/2/2013 5/2/2046 96,923.24
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV CASCAVEL /S. OSORIO C-1 PR RB FT LT 230 kV CASCAVEL /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 28/02/2013 27/02/2046 97,088.76
  S. OSORIO IB 230 kV MG 230 kV S. OSORIO MG1 PR IB1 RB FT MG 230 kV S. OSORIO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RMEL REN 643/2014 20/03/2014 19/03/2047 99,985.13
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /PATO BRANCO C-1 PR RB FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR 057/2001 IPCA RMEL REN 643/2014 27/03/2014 26/03/2047 100,037.79
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 9/4/2014 8/4/2047 100,135.58
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR RB FT LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 16/04/2014 15/04/2047 100,188.26
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 28/05/2014 27/05/2047 100,504.21
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RMEL REN 643/2014 11/9/2014 10/9/2047 101,301.67
  S. OSORIO MC 230 kV TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 121,479.66
  S. OSORIO TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 135,512.53
  S. OSORIO TR 230/69 kV S. OSORIO TR7 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 138,738.12
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR RB FT LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 165,485.86
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-1 PR RB FT LT 230 kV AREIA /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV AREIA /S. OSORIO C-2 PR RB FT LT 230 kV AREIA /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-1 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV C.MOURAO /S. OSORIO C-2 PR RB FT LT 230 kV C.MOURAO /S. OSORIO C-2 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV CASCAVEL /S. OSORIO C-1 PR RB FT LT 230 kV CASCAVEL /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR RB FT LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /PATO BRANCO C-1 PR RB FT LT 230 kV S. OSORIO /PATO BRANCO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,424.90
  S. OSORIO EL 230 kV S. OSORIO LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR RB FT LT 230 kV FOZ DO CHOPIM /S. OSORIO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 260,984.70
  S. OSORIO MG 230 kV S. OSORIO MG1 PR RB FT MG 230 kV S. OSORIO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 417,146.17
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 24/08/2014 23/08/2045 2,173.47
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2045 2,514.68
  S.SANTIAGO MG 500 kV S.SANTIAGO MG1 PR RB FT MG 500 kV S.SANTIAGO MG1 PR 057/2001 IPCA RMEL REN 643/2014 11/10/2013 10/10/2030 10,697.16
  S.SANTIAGO MC 13,8 kV TR 69/13,8 kV S.SANTIAGO TR4 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 33,500.60
  S.SANTIAGO EL 13,8 kV S.SANTIAGO  DIST1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 37,467.66
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 14/11/2013 13/11/2036 41,313.52
  S.SANTIAGO MC 69 kV TR 69/13,8 kV S.SANTIAGO TR4 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,119.29
  S.SANTIAGO IB 500 kV MG 500 kV S.SANTIAGO MG1 PR IB1 RB FT MG 500 kV S.SANTIAGO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  S.SANTIAGO IB 500 kV MG 500 kV S.SANTIAGO MG1 PR IB2 RB FT MG 500 kV S.SANTIAGO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  S.SANTIAGO IB 500 kV MG 500 kV S.SANTIAGO MG1 PR IB3 RB FT MG 500 kV S.SANTIAGO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,051.19
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /SEGREDO C-1 PR RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,051.19
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /ITA C-1 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /SEGREDO C-1 PR RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-1 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /U.S.SANTIAGO C-2 PR DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /SEGREDO C-1 PR RB FT LT 500 kV S.SANTIAGO /SEGREDO C-1 PR 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 542,596.80
  S.SANTIAGO IB 500 kV MG 500 kV S.SANTIAGO MG2 PR IB5 RB FT MG 500 kV S.SANTIAGO MG2 PR 004/2012 IPCA RBL CC 004/2012 4/2/2014 10/5/2042 1,051,423.93
  S.SANTIAGO MG 500 kV S.SANTIAGO MG1 PR RB FT MG 500 kV S.SANTIAGO MG1 PR 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,075,977.40
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV S.SANTIAGO /ITA C-2 PR/SC RB FT LT 500 kV S.SANTIAGO /ITA C-2 PR/SC 004/2012 IPCA RBL CC 004/2012 4/2/2014 10/5/2042 1,109,596.32
  S.SANTIAGO EL 500 kV S.SANTIAGO LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR RB FT LT 500 kV IVAIPORA /S.SANTIAGO C-2 PR 004/2004 IGPM RBL CC 004/2004 31/10/2005 18/02/2034 4,584,967.71
  SANTA CRUZ 1 RTL 230 kV 5 Mvar SANTA CRUZ 1 RT1 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038 35,988.31
  SANTA CRUZ 1 EL 230 kV SANTA CRUZ 1 LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBNI REA 5861/2016 24/05/2019 23/05/2036 38,234.25
  SANTA CRUZ 1 MC 230 kV RTL 230 kV 5 Mvar SANTA CRUZ 1 RT1 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038 79,804.13
  SANTA CRUZ 1 EL 230 kV SANTA CRUZ 1 LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS RB FT LT 230 kV PRE.MEDICI /SANTA CRUZ 1 C-1 RS 004/2008 IPCA RBL CC 004/2008 17/03/2008 17/03/2038 299,279.86
  SANTA MARIA 3 MC 138 kV TR 230/138 kV SANTA MARIA 3 TR3 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR3 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044 220,387.70
  SANTA MARIA 3 MC 138 kV TR 230/138 kV SANTA MARIA 3 TR4 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR4 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044 220,387.70
  SANTA MARIA 3 MC 230 kV TR 230/138 kV SANTA MARIA 3 TR3 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR3 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044 286,753.63
  SANTA MARIA 3 MC 230 kV TR 230/138 kV SANTA MARIA 3 TR4 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR4 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044 286,753.63
  SANTA MARIA 3 IB 138 kV MG 230 kV SANTA MARIA 3 MG2 RS IB1 DIT   007/2014 IPCA RPEC CC 007/2014 19/05/2016 29/01/2044 532,880.12
  SANTA MARIA 3 TR 230/138 kV SANTA MARIA 3 TR3 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR3 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044 623,333.70
  SANTA MARIA 3 TR 230/138 kV SANTA MARIA 3 TR4 RS RBF FT TR 230/138 kV SANTA MARIA 3 TR4 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044 623,333.70
  SANTA MARIA 3 EL 138 kV SANTA MARIA 3  FORMIGUEIRO 2 DIT   007/2014 IPCA RPEC CC 007/2014 19/05/2016 29/01/2044 955,481.22
  SANTA MARIA 3 MG 230 kV SANTA MARIA 3 MG2 RS RB FT MG 230 kV SANTA MARIA 3 MG2 RS 007/2014 IPCA RBL CC 007/2014 19/05/2016 29/01/2044 1,171,788.01
  SANTO ANGELO MC 500 kV RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS 057/2001 IPCA RMEL REN 643/2014 12/3/2015 11/3/2048 113.36
  SANTO ANGELO MG 500 kV SANTO ANGELO MG1 RS RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RMEL REN 643/2014 22/12/2014 21/12/2041 788.10
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /MISSOES C-1 RS RB FT LT 230 kV SANTO ANGELO /MISSOES C-1 RS 057/2001 IPCA RMEL REN 643/2014 22/11/2015 21/11/2044 793.03
  SANTO ANGELO EL 500 kV SANTO ANGELO LT 500 kV SANTO ANGELO /ITA C-1 RS/SC RB FT LT 500 kV SANTO ANGELO /ITA C-1 RS/SC 057/2001 IPCA RMEL REN 643/2014 6/9/2016 5/9/2047 794.31
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS RB FT LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS 057/2001 IPCA RMEL REN 643/2014 23/09/2013 22/09/2036 21,158.96
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /MISSOES C-1 RS RB FT LT 230 kV SANTO ANGELO /MISSOES C-1 RS 057/2001 IPCA RMEL REN 643/2014 23/10/2013 22/10/2036 21,194.41
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /SANTA ROSA 1 C-1 RS RB FT LT 230 kV SANTO ANGELO /SANTA ROSA 1 C-1 RS 057/2001 IPCA RMEL REN 643/2014 3/12/2013 2/12/2036 21,244.09
  SANTO ANGELO MC 230 kV TR 500/230 kV SANTO ANGELO TR2 RS RB FT TR 500/230 kV SANTO ANGELO TR2 RS 057/2001 IPCA RMEL REN 643/2014 10/10/2014 9/10/2037 21,568.86
  SANTO ANGELO MC 500 kV TR 500/230 kV SANTO ANGELO TR2 RS RB FT TR 500/230 kV SANTO ANGELO TR2 RS 057/2001 IPCA RMEL REN 643/2014 10/3/2016 9/3/2039 30,630.32
  SANTO ANGELO MG 500 kV SANTO ANGELO MG1 RS RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RMEL REN 643/2014 6/10/2014 5/10/2031 31,372.29
  SANTO ANGELO MG 500 kV SANTO ANGELO MG1 RS RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBNI REA 5861/2016 21/11/2018 20/11/2035 31,433.15
  SANTO ANGELO MC 500 kV RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS 057/2001 IPCA RMEL REN 643/2014 10/12/2014 9/12/2037 45,202.46
  SANTO ANGELO MG 500 kV SANTO ANGELO MG1 RS RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBNI REA 5616/2016 4/2/2018 3/2/2050 69,825.27
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS RB FT LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS 057/2001 IPCA RBNI REA 5861/2016 12/6/2019 11/6/2034 92,182.60
  SANTO ANGELO IB 230 kV MG 500 kV SANTO ANGELO MG1 RS IB5 RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
  SANTO ANGELO MC 230 kV TR 500/230 kV SANTO ANGELO TR2 RS RB FT TR 500/230 kV SANTO ANGELO TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  SANTO ANGELO MC 230 kV TR 500/230 kV SANTO ANGELO TR3 RS RB FT TR 500/230 kV SANTO ANGELO TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /MISSOES C-1 RS RB FT LT 230 kV SANTO ANGELO /MISSOES C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /SANTA ROSA 1 C-1 RS RB FT LT 230 kV SANTO ANGELO /SANTA ROSA 1 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS RB FT LT 230 kV SANTO ANGELO /SANTO ANGELO 2 C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  SANTO ANGELO RTB 500 kV 50 Mvar SANTO ANGELO RTR1 RS RB FT RTB 500 kV 50 Mvar SANTO ANGELO RTR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,486.33
  SANTO ANGELO MC 500 kV RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 291,080.08
  SANTO ANGELO MC 500 kV RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 291,080.08
  SANTO ANGELO MC 500 kV TR 500/230 kV SANTO ANGELO TR2 RS RB FT TR 500/230 kV SANTO ANGELO TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90

 

43 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  SANTO ANGELO MC 500 kV TR 500/230 kV SANTO ANGELO TR3 RS RB FT TR 500/230 kV SANTO ANGELO TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,884.90
  SANTO ANGELO IB 500 kV MG 500 kV SANTO ANGELO MG1 RS IB1 RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  SANTO ANGELO IB 500 kV MG 500 kV SANTO ANGELO MG1 RS IB2 RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  SANTO ANGELO IB 500 kV MG 500 kV SANTO ANGELO MG1 RS IB3 RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  SANTO ANGELO IB 500 kV MG 500 kV SANTO ANGELO MG1 RS IB4 RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 329,915.33
  SANTO ANGELO EL 500 kV SANTO ANGELO LT 500 kV CV.GARABI 1 /SANTO ANGELO C-1 RS RB FT LT 500 kV CV.GARABI 1 /SANTO ANGELO C-1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  SANTO ANGELO EL 500 kV SANTO ANGELO LT 500 kV SANTO ANGELO /ITA C-1 RS/SC RB FT LT 500 kV SANTO ANGELO /ITA C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 352,240.60
  SANTO ANGELO TR 500/230 kV SANTO ANGELO TRR1 RS RB FT TR 500/230 kV SANTO ANGELO TRR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 483,714.95
  SANTO ANGELO RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 566,963.61
  SANTO ANGELO RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,458.98
  SANTO ANGELO RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,458.98
  SANTO ANGELO EL 230 kV SANTO ANGELO LT 230 kV MACAMBARA /SANTO ANGELO C-1 RS RB FT LT 230 kV MACAMBARA /SANTO ANGELO C-2 RS 007/2014 IPCA RBL CC 007/2014 6/12/2019 29/01/2044 604,478.45
  SANTO ANGELO MC 230 kV TR 525/230 kV SANTO ANGELO TR1 RS RB FT TR 500/230 kV SANTO ANGELO TR1 RS 057/2001 IPCA RBNI REA 5616/2016 4/2/2018 3/2/2041 740,391.96
  SANTO ANGELO RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS RB FT RTB 500 kV 150 Mvar SANTO ANGELO RT1 RS 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 894,147.88
  SANTO ANGELO MG 500 kV SANTO ANGELO MG1 RS RB FT MG 500 kV SANTO ANGELO MG1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,244,826.87
  SANTO ANGELO TR 500/230 kV SANTO ANGELO TR2 RS RB FT TR 500/230 kV SANTO ANGELO TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  SANTO ANGELO TR 500/230 kV SANTO ANGELO TR3 RS RB FT TR 500/230 kV SANTO ANGELO TR3 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,451,144.84
  SANTO ANGELO MC 525 kV TR 525/230 kV SANTO ANGELO TR1 RS RB FT TR 500/230 kV SANTO ANGELO TR1 RS 057/2001 IPCA RBNI REA 5616/2016 4/2/2018 3/2/2046 1,893,301.00
  SANTO ANGELO TR 525/230 kV SANTO ANGELO TR1 RS RB FT TR 500/230 kV SANTO ANGELO TR1 RS 057/2001 IPCA RBNI REA 5616/2016 4/2/2018 3/2/2053 7,693,074.26
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI DSP 1425/2021 26/05/2021 25/05/2036 505.23
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBNI DSP 1425/2021 26/05/2021 25/05/2036 505.23
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBNI DSP 1425/2021 26/05/2021 25/05/2036 505.23
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI DSP 1425/2021 26/05/2021 25/05/2036 505.23
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 11/9/2014 10/9/2034 2,615.90
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 1/12/2016 30/11/2036 2,862.54
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 8795/2020 13/11/2020 13/11/2053 10,929.64
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8795/2020 13/11/2020 13/11/2057 12,330.04
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 8/11/2020 7/11/2035 14,215.09
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBNI REA 8314/2019 19/12/2021 18/12/2036 20,158.62
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RCDM REA 8314/2019 6/6/2021 5/6/2051 20,377.00
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBNI REA 8314/2019 19/12/2021 18/12/2036 20,763.56
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RCDM REA 8314/2019 24/04/2022 23/04/2037 20,838.35
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RCDM REA 8314/2019 24/04/2022 23/04/2037 20,838.35
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBNI REA 8314/2019 21/03/2022 20/03/2037 20,846.92
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBNI REA 8314/2019 21/03/2022 20/03/2037 20,846.92
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBNI REA 8314/2019 20/05/2021 19/05/2051 21,223.72
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU  DIST1 DIT   057/2001 IPCA RCDM REA 8314/2019 29/04/2022 28/04/2037 21,871.05
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU  DIST1 DIT   057/2001 IPCA RCDM REA 8314/2019 29/04/2022 28/04/2037 21,871.05
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRIC.FLORESTA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RCDM REA 8314/2019 6/8/2021 5/8/2051 22,411.59
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU  DIST1 DIT   057/2001 IPCA RCDM REA 8314/2019 29/04/2022 28/04/2037 22,678.61
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RCDM REA 8314/2019 24/04/2022 23/04/2037 22,858.74
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8795/2020 13/11/2020 13/11/2057 22,880.38
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 8314/2019 13/04/2022 12/4/2037 23,236.52
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 8314/2019 27/02/2022 26/02/2052 24,739.42
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBNI REA 8314/2019 19/12/2021 18/12/2036 26,721.22
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU  DIST1 DIT   057/2001 IPCA RCDM REA 7528/2018 22/06/2021 21/06/2051 27,935.57
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNIA REA 10935/2021     28,363.23
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBNI REA 7528/2018 2/5/2021 1/5/2051 29,530.63
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 7528/2018 14/01/2021 13/01/2061 31,507.69
  SIDEROPOL.ESU IB 69 kV MG 230 kV SIDEROPOL.ESU MG1 SC IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,603.88
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU  DIST1 DIT   057/2001 IPCA RCDM REA 7528/2018 22/06/2021 21/06/2054 32,736.41
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RCDM REA 7528/2018 8/7/2021 7/7/2054 33,237.07
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRIC.FLORESTA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RCDM REA 7528/2018 1/8/2021 31/07/2054 33,253.24
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 7528/2018 21/08/2021 20/08/2054 33,271.09
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RCDM REA 7528/2018 14/06/2021 13/06/2054 33,303.99
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RCDM REA 8314/2019 8/7/2021 7/7/2051 34,838.07
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV SIDEROPOL.CSC /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RCDM REA 7528/2018 16/07/2021 15/07/2051 34,847.52
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU  DIST1 DIT   057/2001 IPCA RCDM REA 8314/2019 22/06/2021 21/06/2051 39,540.63
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV SIDEROPOL.CSC /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RCDM REA 8314/2019 17/07/2021 16/07/2051 41,154.82
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBNI REA 8314/2019 15/11/2021 14/11/2036 45,363.32
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 8314/2019 13/04/2022 12/4/2037 45,783.09
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 45,928.38
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 7528/2018 29/05/2021 28/05/2051 46,544.55
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBNI REA 8314/2019 17/10/2021 16/10/2051 46,841.65
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 1535/2008 6/6/2012 5/6/2040 46,983.10
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBNI REA 7528/2018 2/5/2021 1/5/2051 47,352.43
  SIDEROPOL.ESU IB 230 kV MG 230 kV SIDEROPOL.ESU MG1 SC IB1 RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 7528/2018 3/10/2021 2/10/2051 48,259.54
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 8314/2019 10/8/2021 9/8/2051 49,502.76
  SIDEROPOL.ESU IB 69 kV MG 230 kV SIDEROPOL.ESU MG1 SC IB1 DIT   057/2001 IPCA RCDM REA 8314/2019 28/10/2021 27/10/2036 50,101.09
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 8314/2019 7/11/2021 6/11/2036 50,128.50
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REN 443/2011 29/11/2015 28/11/2043 51,744.23
  SIDEROPOL.ESU IB 230 kV MG 230 kV SIDEROPOL.ESU MG1 SC IB1 RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 8314/2019 21/10/2021 20/10/2036 51,824.00
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNIA REA 10935/2021     53,647.63
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRIC.FLORESTA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 53,693.63
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRIC.FLORESTA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV CRICIUMA /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV SIDEROPOL.CSC /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV SIDEROPOL.CSC /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV SIDEROPOL.CSC /SIDEROPOL.ESU C-1 SC DIT   057/2001 IPCA RCDM REA 7528/2018 16/07/2021 15/07/2054 57,114.05
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 21/08/2021 20/08/2051 62,672.41
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 8314/2019 12/10/2021 11/10/2051 62,835.56

 

44 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBNI REA 8314/2019 3/10/2021 2/10/2051 63,320.12
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 7528/2018 3/10/2021 2/10/2061 67,493.13
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 7528/2018 22/08/2021 21/08/2054 70,237.26
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 72,432.80
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 7528/2018 25/04/2021 24/04/2051 76,536.42
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 8/11/2020 7/11/2035 82,177.83
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 8314/2019 10/4/2022 9/4/2037 83,598.87
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 8314/2019 27/02/2022 26/02/2037 84,399.37
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 8/11/2020 7/11/2035 85,366.58
  SIDEROPOL.ESU IB 230 kV MG 230 kV SIDEROPOL.ESU MG1 SC IB1 RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 86,880.35
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 8314/2019 6/12/2021 5/12/2036 95,536.11
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 8314/2019 6/12/2021 5/12/2036 108,743.49
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,775.22
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 7528/2018 23/06/2021 22/06/2051 109,919.86
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 8314/2019 10/4/2022 9/4/2037 128,036.33
  SIDEROPOL.ESU MC 69 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 8314/2019 10/4/2022 9/4/2037 128,829.05
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TRR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TRR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 134,497.63
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TRR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TRR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 137,699.06
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,538.51
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 8/11/2020 7/11/2035 160,875.51
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 8314/2019 21/11/2021 20/11/2036 164,523.91
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 8314/2019 28/03/2022 27/03/2050 173,684.70
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNI REA 7528/2018 23/05/2021 22/05/2051 182,866.13
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 7528/2018 25/04/2021 24/04/2051 183,338.70
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU LT 69 kV SIDEROPOL.CSC /SIDEROPOL.ESU C-2 SC DIT   057/2001 IPCA RCDM REA 8314/2019 24/04/2022 23/04/2037 190,181.81
  SIDEROPOL.ESU IB 230 kV MG 230 kV SIDEROPOL.ESU MG1 SC IB1 RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBNI REA 7528/2018 23/02/2020 22/02/2053 192,398.46
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV J.LACERDA-B /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 8314/2019 6/12/2021 5/12/2036 203,295.95
  SIDEROPOL.ESU MC 230 kV TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8314/2019 8/11/2020 7/11/2035 213,632.31
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 244,493.82
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 244,493.82
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,313.47
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR2 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,313.47
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,313.47
  SIDEROPOL.ESU EL 230 kV SIDEROPOL.ESU LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC RB FT LT 230 kV FORQUILHINHA /SIDEROPOL.ESU C-1 SC 057/2001 IPCA RBNI REA 7528/2018 10/8/2021 9/8/2054 288,205.71
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR3 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR3 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 385,586.70
  SIDEROPOL.ESU MG 230 kV SIDEROPOL.ESU MG1 SC RB FT MG 230 kV SIDEROPOL.ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 396,970.04
  SIDEROPOL.ESU EL 69 kV SIDEROPOL.ESU  DIST1 DIT   057/2001 IPCA RCDM REN 443/2011 29/11/2015 28/11/2045 481,507.87
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR4 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR4 SC 057/2001 IPCA RBNI REA 8795/2020 13/11/2020 13/11/2054 1,851,215.55
  SIDEROPOL.ESU TR 230/69 kV SIDEROPOL.ESU TR1 SC RBF FT TR 230/69 kV SIDEROPOL.ESU TR1 SC 057/2001 IPCA RBNIA REA 10935/2021     2,342,740.30
  STA V.PALMAR MG 525 kV STA V.PALMAR MG1 RS RB FT MG 525 kV STA V.PALMAR MG1 RS 020/2012 IPCA RBNIA REA 8377/2019     83,534.57
  STA V.PALMAR MC 138 kV TR 525/138 kV STA V.PALMAR TR1 RS RBF FT TR 525/138 kV STA V.PALMAR TR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 299,616.74
  STA V.PALMAR IB 138 kV MG 525 kV STA V.PALMAR MG1 RS IB1 DIT   020/2012 IPCA RPEC CC 020/2012 19/12/2014 27/08/2042 385,520.77
  STA V.PALMAR RTL 525 kV 16,67 Mvar STA V.PALMAR RTR1 RS RB FT RTL 525 kV 16,67 Mvar STA V.PALMAR RTR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 442,512.75
  STA V.PALMAR MG 525 kV STA V.PALMAR MG1 RS RB FT MG 525 kV STA V.PALMAR MG1 RS 020/2012 IPCA RBNIA REA 8377/2019     513,616.27
  STA V.PALMAR EL 138 kV STA V.PALMAR  DIST1 DIT   020/2012 IPCA RPEC CC 020/2012 19/12/2014 27/08/2042 572,769.31
  STA V.PALMAR EL 138 kV STA V.PALMAR  DIST2 DIT   020/2012 IPCA RPEC CC 020/2012 19/12/2014 27/08/2042 572,769.31
  STA V.PALMAR MC 138 kV TR 525/138 kV STA V.PALMAR TR2 RS RB FT TR 525/138 kV STA V.PALMAR TR2 RS 020/2012 IPCA RBNIA REA 8377/2019     609,429.83
  STA V.PALMAR MC 525 kV RTL 525 kV 50 Mvar STA V.PALMAR RT1 RS RB FT RTL 525 kV 50 Mvar STA V.PALMAR RT1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,027,931.34
  STA V.PALMAR MC 525 kV TR 525/138 kV STA V.PALMAR TR1 RS RBF FT TR 525/138 kV STA V.PALMAR TR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,098,971.00
  STA V.PALMAR IB 525 kV MG 525 kV STA V.PALMAR MG1 RS IB1 RB FT MG 525 kV STA V.PALMAR MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,167,378.04
  STA V.PALMAR MC 525 kV TR 525/138 kV STA V.PALMAR TR2 RS RB FT TR 525/138 kV STA V.PALMAR TR2 RS 020/2012 IPCA RBNIA REA 8377/2019     1,212,515.91
  STA V.PALMAR EL 525 kV STA V.PALMAR LT 525 kV MARMELEIRO /STA V.PALMAR C-1 RS RB FT LT 525 kV MARMELEIRO /STA V.PALMAR C-1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,239,980.39
  STA V.PALMAR TR 525/138 kV STA V.PALMAR TR2 RS RB FT TR 525/138 kV STA V.PALMAR TR2 RS 020/2012 IPCA RBNIA REA 8377/2019     1,282,265.97
  STA V.PALMAR RTL 525 kV 50 Mvar STA V.PALMAR RT1 RS RB FT RTL 525 kV 50 Mvar STA V.PALMAR RT1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,327,538.26
  STA V.PALMAR TR 525/138 kV STA V.PALMAR TR1 RS RBF FT TR 525/138 kV STA V.PALMAR TR1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,625,700.29
  STA V.PALMAR MG 525 kV STA V.PALMAR MG1 RS RB FT MG 525 kV STA V.PALMAR MG1 RS 020/2012 IPCA RBL CC 020/2012 19/12/2014 27/08/2042 1,761,326.64
  TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TF3 RS RBF FT TR 230/69 kV TAPERA 2 TF3 RS 057/2001 IPCA RMEL REN 643/2014 13/04/2014 12/4/2048 2.12
  TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TR1 RS RBF FT TR 230/69 kV TAPERA 2 TR1 RS 057/2001 IPCA RMEL REN 643/2014 12/4/2014 11/4/2048 171.89
  TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TR2 RS RBF FT TR 230/69 kV TAPERA 2 TR2 RS 057/2001 IPCA RMEL REN 643/2014 17/05/2015 16/05/2049 218.38
  TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RMEL REN 643/2014 12/4/2014 11/4/2034 520.37
  TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RMEL REN 643/2014 13/04/2014 12/4/2034 520.44
  TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RBNI REA 6630/2017 20/03/2018 19/03/2035 11,611.96
  TAPERA 2 IB 69 kV MG 230 kV TAPERA 2 MG2 RS IB1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,603.88
  TAPERA 2 MC 69 kV TR 230/69 kV TAPERA 2 TR1 RS RBF FT TR 230/69 kV TAPERA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  TAPERA 2 MC 69 kV TR 230/69 kV TAPERA 2 TR2 RS RBF FT TR 230/69 kV TAPERA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 47,021.61
  TAPERA 2 EL 69 kV TAPERA 2  IBIRUBA DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  TAPERA 2 EL 69 kV TAPERA 2  NAO-ME-TOQUE DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  TAPERA 2 EL 69 kV TAPERA 2  SOLEIDADE DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  TAPERA 2 EL 69 kV TAPERA 2  TAPERA 1 DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,971.69
  TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TR1 RS RBF FT TR 230/69 kV TAPERA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TR2 RS RBF FT TR 230/69 kV TAPERA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RBNI REA 5603/2016 25/01/2018 24/01/2046 191,549.75
  TAPERA 2 TR 230/69 kV TAPERA 2 TR1 RS RBF FT TR 230/69 kV TAPERA 2 TR1 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 243,597.20
  TAPERA 2 TR 230/69 kV TAPERA 2 TR2 RS RBF FT TR 230/69 kV TAPERA 2 TR2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 243,597.20
  TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 317,294.94
  TAPERA 2 EL 69 kV TAPERA 2  CARAZINHO C2 DIT   057/2001 IPCA RCDM REA 2589/2010 7/1/2014 6/1/2043 348,290.85
  TAPERA 2 EL 69 kV TAPERA 2  CARAZINHO C1 DIT   057/2001 IPCA RCDM REA 2589/2010 7/1/2014 6/1/2043 384,415.81
  TAPERA 2 BC 230 kV 0 Mvar TAPERA 2 BC1 RS RB FT BC 230 kV 50 Mvar TAPERA 2 BC1 RS 057/2001 IPCA RBNI REA 5603/2016 25/01/2018 24/01/2041 394,734.96
  TAPERA 2 MG 230 kV TAPERA 2 MG2 RS RB FT MG 230 kV TAPERA 2 MG2 RS 057/2001 IPCA RBNI REA 2589/2010 14/11/2012 13/11/2037 427,431.58
  TAPERA 2 MC 69 kV TR 230/69 kV TAPERA 2 TF3 RS RBF FT TR 230/69 kV TAPERA 2 TF3 RS 057/2001 IPCA RBNI REA 2589/2010 9/11/2012 8/11/2045 649,478.96
  TAPERA 2 MC 230 kV TR 230/69 kV TAPERA 2 TF3 RS RBF FT TR 230/69 kV TAPERA 2 TF3 RS 057/2001 IPCA RBNI REA 2589/2010 9/11/2012 8/11/2042 935,910.20
  TAPERA 2 MC 230 kV BC 230 kV 0 Mvar TAPERA 2 BC1 RS RB FT BC 230 kV 50 Mvar TAPERA 2 BC1 RS 057/2001 IPCA RBNI REA 5603/2016 25/01/2018 24/01/2048 1,108,467.74

 

45 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  TAPERA 2 TR 230/69 kV TAPERA 2 TF3 RS RBF FT TR 230/69 kV TAPERA 2 TF3 RS 057/2001 IPCA RBNI REA 2589/2010 9/11/2012 8/11/2046 1,294,974.83
  TIJUCAS EL 138 kV TIJUCAS LT 138 kV TIJUCAS /CAMBORIU M.B. C-1 SC DIT   057/2001 IPCA RCDM REA 2879/2011 20/11/2012 19/11/2040 613,687.34
  TIJUCAS EL 138 kV TIJUCAS LT 138 kV BIGUACU /TIJUCAS C-1 SC DIT   057/2001 IPCA RCDM REA 2879/2011 20/11/2012 19/11/2042 862,454.02
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RMEL REN 643/2014 29/08/2013 28/08/2036 12,192.48
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RMEL REN 643/2014 29/08/2013 28/08/2036 12,192.48
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-1 MS DIT   057/2001 IPCA RMEL REN 643/2014 25/10/2013 24/10/2036 12,264.13
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RMEL REN 643/2014 25/10/2013 24/10/2036 12,264.13
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 85,337.19
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-1 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,368.46
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-2 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,368.46
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-3 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,368.46
  U.MIMOSO EL 138 kV U.MIMOSO LT 138 kV CAMPO GRANDE /U.MIMOSO C-4 MS DIT   057/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,368.46
  VINHEDOS MG 230 kV VINHEDOS MG2 RS RB FT MG 230 kV VINHEDOS MG2 RS 012/2010 IPCA RBNI DSP 1247/2022 1/7/2022 30/06/2053 41,477.86
  VINHEDOS EL 230 kV VINHEDOS LT 230 kV MONTE CLARO /VINHEDOS C-1 RS RB FT LT 230 kV MONTE CLARO /VINHEDOS C-1 RS 012/2010 IPCA RBNI DSP 1247/2022 1/7/2022 30/06/2051 209,908.50
  VINHEDOS EL 230 kV VINHEDOS LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS RB FT LT 230 kV VINHEDOS /GARIBALDI 1 C-1 RS 012/2010 IPCA RBNI DSP 1247/2022 1/7/2022 30/06/2051 209,908.50
  XANXERE ESU TR 230/138 kV XANXERE ESU TR2 SC RBF FT TR 230/138 kV XANXERE ESU TR2 SC 057/2001 IPCA RMEL REN 643/2014 17/11/2014 16/11/2054 38.47
  XANXERE ESU MC 230 kV BC 230 kV 100 Mvar XANXERE ESU BC1 SC RB FT BC 230 kV 100 Mvar XANXERE ESU BC1 SC 057/2001 IPCA RMEL REN 643/2014 1/12/2014 30/11/2046 39.18
  XANXERE ESU MC 230 kV TR 230/138 kV XANXERE ESU TR3 SC RBF FT TR 230/138 kV XANXERE ESU TR3 SC 057/2001 IPCA RMEL REN 643/2014 19/10/2014 18/10/2048 219.44
  XANXERE ESU MC 230 kV TR 230/138 kV XANXERE ESU TR4 SC RBF FT TR 230/138 kV XANXERE ESU TR4 SC 057/2001 IPCA RMEL REN 643/2014 1/11/2014 31/10/2048 219.65
  XANXERE ESU TR 230/138 kV XANXERE ESU TR1 SC RBF FT TR 230/138 kV XANXERE ESU TR1 SC 057/2001 IPCA RMEL REN 643/2014 16/08/2015 15/08/2055 500.53
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC 057/2001 IPCA RMEL REN 643/2014 13/09/2014 12/9/2044 2,506.48
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 10/1/2015 9/1/2045 2,530.59
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 11/1/2015 10/1/2045 2,530.79
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC 057/2001 IPCA RMEL REN 643/2014 28/09/2015 27/09/2045 2,583.43
  XANXERE ESU MG 230 kV XANXERE ESU MG1 SC RB FT MG 230 kV XANXERE ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 29/06/2015 28/06/2035 2,704.29
  XANXERE ESU MG 230 kV XANXERE ESU MG1 SC RB FT MG 230 kV XANXERE ESU MG1 SC 057/2001 IPCA RMEL REN 643/2014 29/06/2015 28/06/2035 2,704.29
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC 057/2001 IPCA RMEL REN 643/2014 17/08/2013 16/08/2036 19,689.73
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RMEL REN 643/2014 21/08/2013 20/08/2036 19,697.86
  XANXERE ESU MG 230 kV XANXERE ESU MG2 SC RB FT MG 230 kV XANXERE ESU MG2 SC 002/2011 IPCA RBNI REA 6454/2017 1/7/2017 15/06/2040 53,973.77
  XANXERE ESU MC 138 kV TR 230/138 kV XANXERE ESU TR1 SC RBF FT TR 230/138 kV XANXERE ESU TR1 SC 057/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 75,397.57
  XANXERE ESU MC 138 kV TR 230/138 kV XANXERE ESU TR1 SC RBF FT TR 230/138 kV XANXERE ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,192.25
  XANXERE ESU MC 138 kV TR 230/138 kV XANXERE ESU TR2 SC RBF FT TR 230/138 kV XANXERE ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,192.25
  XANXERE ESU MC 138 kV TR 230/138 kV XANXERE ESU TR3 SC RBF FT TR 230/138 kV XANXERE ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,192.25
  XANXERE ESU MC 138 kV TR 230/138 kV XANXERE ESU TR4 SC RBF FT TR 230/138 kV XANXERE ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 77,192.25
  XANXERE ESU IB 230 kV MG 230 kV XANXERE ESU MG1 SC IB1 RB FT MG 230 kV XANXERE ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 99,816.54
CHESF       XANXERE ESU MC 230 kV TR 230/138 kV XANXERE ESU TR3 SC RBF FT TR 230/138 kV XANXERE ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  XANXERE ESU MC 230 kV TR 230/138 kV XANXERE ESU TR4 SC RBF FT TR 230/138 kV XANXERE ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,273.54
  XANXERE ESU MC 230 kV BC 230 kV 100 Mvar XANXERE ESU BC1 SC RB FT BC 230 kV 100 Mvar XANXERE ESU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,714.06
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-1 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV PASSO FUNDO /XANXERE ESU C-2 RS/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV PATO BRANCO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC RB FT LT 230 kV S. OSORIO /XANXERE ESU C-1 PR/SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 163,776.65
  XANXERE ESU MG 230 kV XANXERE ESU MG1 SC RB FT MG 230 kV XANXERE ESU MG1 SC 057/2001 IPCA RBNI REA 2164/2009 31/05/2012 30/05/2037 166,814.46
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-1 RS/SC 002/2011 IPCA RBNI REA 6454/2017 1/7/2017 15/06/2047 168,220.95
  XANXERE ESU EL 230 kV XANXERE ESU LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC RB FT LT 230 kV FOZ DO CHAPECO /XANXERE ESU C-2 RS/SC 002/2011 IPCA RBNI REA 6454/2017 1/7/2017 15/06/2047 168,220.95
  XANXERE ESU BC 230 kV 100 Mvar XANXERE ESU BC1 SC RB FT BC 230 kV 100 Mvar XANXERE ESU BC1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 185,425.15
  XANXERE ESU TR 230/138 kV XANXERE ESU TR1 SC RBF FT TR 230/138 kV XANXERE ESU TR1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  XANXERE ESU TR 230/138 kV XANXERE ESU TR2 SC RBF FT TR 230/138 kV XANXERE ESU TR2 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  XANXERE ESU TR 230/138 kV XANXERE ESU TR3 SC RBF FT TR 230/138 kV XANXERE ESU TR3 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  XANXERE ESU TR 230/138 kV XANXERE ESU TR4 SC RBF FT TR 230/138 kV XANXERE ESU TR4 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,127.68
  XANXERE ESU MG 230 kV XANXERE ESU MG1 SC RB FT MG 230 kV XANXERE ESU MG1 SC 057/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 444,667.52
  ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /ZEBU C-1 BA/AL DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046 4,900.69
  ABAIXADORA EL 69 kV ABAIXADORA  DELMIRO GOUVEIA DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046 4,900.69
  ABAIXADORA MC 69 kV TR 69/13,8 kV ABAIXADORA TR6 BA DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046 7,351.03
  ABAIXADORA MC 69 kV TR 69/13,8 kV ABAIXADORA TR3 BA DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046 7,351.03
  ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MULUNGU C-1 BA DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046 9,801.37
  ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MOXOTO C-1 BA DIT   061/2001 IPCA RMEL REN 443/2011 26/07/2016 25/07/2046 9,801.37
  ABAIXADORA TR 69/13,8 kV ABAIXADORA TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  ABAIXADORA MG 230 kV ABAIXADORA MG1 BA RB FT MG 230 kV ABAIXADORA MG1 BA 061/2001 IPCA RMEL REN 643/2014 9/11/2015 8/11/2032 31,056.58
  ABAIXADORA IB 69 kV MG 230 kV ABAIXADORA MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  ABAIXADORA MC 13,8 kV TR 69/13,8 kV ABAIXADORA TR6 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  ABAIXADORA MC 13,8 kV TR 69/13,8 kV ABAIXADORA TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  ABAIXADORA MC 69 kV TR 69/13,8 kV ABAIXADORA TR6 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ABAIXADORA MC 69 kV TR 69/13,8 kV ABAIXADORA TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ABAIXADORA MC 69 kV TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /ZEBU C-1 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MULUNGU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ABAIXADORA EL 69 kV ABAIXADORA LT 69 kV ABAIXADORA /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ABAIXADORA EL 69 kV ABAIXADORA  DELMIRO GOUVEIA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ABAIXADORA MC 69 kV TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBNI REA 2040/2009 24/03/2013 23/03/2044 77,711.94
  ABAIXADORA MC 69 kV TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  ABAIXADORA TT 69/13,8 kV ABAIXADORA TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  ABAIXADORA MC 230 kV TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,415.42
  ABAIXADORA IB 230 kV MG 230 kV ABAIXADORA MG1 BA IB1 RB FT MG 230 kV ABAIXADORA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  ABAIXADORA TT 69/13,8 kV ABAIXADORA TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  ABAIXADORA MC 230 kV TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 149,654.97
  ABAIXADORA TR 69/69 kV ABAIXADORA TREG1 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,845.55
  ABAIXADORA TR 230/69 kV ABAIXADORA TRR1 BA RBF FT TR 230/69 kV ABAIXADORA TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 191,080.06
  ABAIXADORA TR 230/69 kV ABAIXADORA TR1 BA RBF FT TR 230/69 kV ABAIXADORA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 191,080.06
  ABAIXADORA TT 69/13,8 kV ABAIXADORA TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  ABAIXADORA MG 230 kV ABAIXADORA MG1 BA RB FT MG 230 kV ABAIXADORA MG1 BA 061/2001 IPCA RBNI DSP 386/2021 2/12/2021 1/12/2036 366,946.19
  ABAIXADORA TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  ABAIXADORA MG 230 kV ABAIXADORA MG1 BA RB FT MG 230 kV ABAIXADORA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 454,662.77
  ABAIXADORA TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  ABAIXADORA MG 230 kV ABAIXADORA MG1 BA RB FT MG 230 kV ABAIXADORA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 627,609.41
  ABAIXADORA TR 230/69 kV ABAIXADORA TR2 BA RBF FT TR 230/69 kV ABAIXADORA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84

 

46 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  ACARAU II MG 230 kV ACARAU II MG1 CE RB FT MG 230 kV ACARAU II MG1 CE 021/2010 IPCA RBNI REN 905/2020 16/10/2020 15/10/2051 32,573.13
  ACARAU II MG 230 kV ACARAU II MG1 CE RB FT MG 230 kV ACARAU II MG1 CE 021/2010 IPCA RBNI REN 905/2020 16/10/2020 15/10/2051 32,573.13
  ACARAU II MC 69 kV TT 69/0 kV ACARAU II TT1 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 69,613.38
  ACARAU II MG 69 kV ACARAU II MG1 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 70,102.49
  ACARAU II TT 69/0 kV ACARAU II TT1 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 90,004.44
  ACARAU II IB 69 kV MG 69 kV ACARAU II MG1 CE IB1 ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 111,294.90
  ACARAU II MC 69 kV TR 230/69 kV ACARAU II TR2 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 163,217.42
  ACARAU II MC 69 kV TR 230/69 kV ACARAU II TR1 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 163,217.42
  ACARAU II MC 230 kV RTB 230 kV 20 Mvar ACARAU II RT1 CE RB FT RTB 230 kV 20 Mvar ACARAU II RT1 CE 021/2010 IPCA RBL CC 021/2010 8/4/2014 23/11/2040 322,425.71
  ACARAU II EL 69 kV ACARAU II  DIST02 DIT   021/2010 IPCA RCDM REN 905/2020 16/10/2020 15/10/2047 337,674.09
  ACARAU II EL 69 kV ACARAU II  DIST01 DIT   021/2010 IPCA RCDM REN 905/2020 16/10/2020 15/10/2047 337,674.09
  ACARAU II MC 230 kV TR 230/69 kV ACARAU II TR2 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 401,159.63
  ACARAU II MC 230 kV TR 230/69 kV ACARAU II TR1 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 401,159.63
  ACARAU II EL 230 kV ACARAU II LT 230 kV SOBRAL III /ACARAU II C-1 CE RB FT LT 230 kV SOBRAL III /ACARAU II C-1 CE 021/2010 IPCA RBL CC 021/2010 8/4/2014 23/11/2040 470,591.76
  ACARAU II RTB 230 kV 20 Mvar ACARAU II RT1 CE RB FT RTB 230 kV 20 Mvar ACARAU II RT1 CE 021/2010 IPCA RBL CC 021/2010 8/4/2014 23/11/2040 478,658.68
  ACARAU II MG 230 kV ACARAU II MG1 CE RB FT MG 230 kV ACARAU II MG1 CE 021/2010 IPCA RBL CC 021/2010 8/4/2014 23/11/2040 712,687.05
  ACARAU II TR 230/69 kV ACARAU II TR2 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 1,031,012.84
  ACARAU II TR 230/69 kV ACARAU II TR1 CE ICG   021/2010 IPCA RICG CC 021/2010 23/11/2010 23/11/2040 1,031,012.84
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBNI REA 2837/2011 26/03/2013 25/03/2053 4,403.95
  ACU II MC 138 kV TR 230/138 kV ACU II TR2 RN RBF FT TR 230/138 kV ACU II TR2 RN 061/2001 IPCA RMEL REN 443/2011 10/4/2016 9/4/2046 12,093.73
  ACU II EL 230 kV ACU II LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RMEL REN 643/2014 3/12/2013 2/12/2030 28,325.54
  ACU II IB 13,8 kV MG 230 kV ACU II MG1 RN IB4 RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,975.55
  ACU II BC 13,8 kV 3,6 MVAr ACU II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  ACU II BC 13,8 kV 3,6 MVAr ACU II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  ACU II BC 13,8 kV 3,1 MVAr ACU II BC2 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  ACU II BC 13,8 kV 3,1 MVAr ACU II BC1 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RMEL REN 443/2011 4/10/2016 3/10/2033 32,333.15
  ACU II IB 13,8 kV MG 230 kV ACU II MG1 RN IB4 RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,997.40
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RMEL REN 643/2014 17/12/2015 16/12/2029 42,710.97
  ACU II BC 13,8 kV 3,6 MVAr ACU II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 42,730.34
  ACU II BC 13,8 kV 3,6 MVAr ACU II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 42,730.34
  ACU II IB 69 kV MG 230 kV ACU II MG1 RN IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  ACU II MC 13,8 kV TR 230/69 kV ACU II TR5 RN RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  ACU II MC 13,8 kV TR 230/69 kV ACU II TR4 RN RBF FT TR 230/69 kV ACU II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  ACU II BC 13,8 kV 3,6 MVAr ACU II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN 061/2001 IPCA RMEL REN 643/2014 15/01/2014 14/01/2028 46,866.12
  ACU II BC 13,8 kV 3,1 MVAr ACU II BC2 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC2 RN 061/2001 IPCA RMEL REN 643/2014 17/01/2014 16/01/2028 46,880.33
  ACU II BC 13,8 kV 3,1 MVAr ACU II BC1 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC1 RN 061/2001 IPCA RMEL REN 643/2014 22/01/2014 21/01/2028 46,915.86
  ACU II BC 13,8 kV 3,6 MVAr ACU II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN 061/2001 IPCA RMEL REN 643/2014 24/01/2014 23/01/2028 46,930.08
  ACU II IB 69 kV MG 230 kV ACU II MG1 RN IB2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  ACU II MC 13,8 kV RTB 13,8 kV 5 MVAr ACU II RT1 RN RBF FT RTB 13,8 kV 5 MVAr ACU II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  ACU II MC 69 kV TR 230/69 kV ACU II TR7 RN RBF FT TR 230/69 kV ACU II TR7 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ACU II MC 69 kV TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ACU II MC 69 kV TR 230/69 kV ACU II TR5 RN RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ACU II MC 69 kV TR 230/69 kV ACU II TR4 RN RBF FT TR 230/69 kV ACU II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RMEL REN 643/2014 23/05/2015 22/05/2043 72,496.81
  ACU II MC 13,8 kV BC 13,8 kV 3,6 MVAr ACU II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  ACU II MC 13,8 kV BC 13,8 kV 3,6 MVAr ACU II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  ACU II MC 13,8 kV BC 13,8 kV 3,1 MVAr ACU II BC2 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  ACU II MC 13,8 kV BC 13,8 kV 3,1 MVAr ACU II BC1 RN RBF FT BC 13,8 kV 3,1 MVAr ACU II BC1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  ACU II EL 69 kV ACU II  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ACU II EL 69 kV ACU II  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ACU II EL 69 kV ACU II  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ACU II EL 69 kV ACU II  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ACU II EL 69 kV ACU II  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ACU II MC 69 kV TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  ACU II IB 138 kV MG 230 kV ACU II MG1 RN IB3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,365.85
  ACU II MC 13,8 kV BC 13,8 kV 3,6 MVAr ACU II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC4 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  ACU II MC 13,8 kV BC 13,8 kV 3,6 MVAr ACU II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr ACU II BC3 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  ACU II EL 69 kV ACU II  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ACU II EL 69 kV ACU II  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ACU II EL 69 kV ACU II  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ACU II EL 69 kV ACU II  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ACU II EL 69 kV ACU II  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ACU II EL 230 kV ACU II LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2031 115,676.92
  ACU II MC 138 kV TR 230/138 kV ACU II TR3 RN RBF FT TR 230/138 kV ACU II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  ACU II MC 138 kV TR 230/138 kV ACU II TR2 RN RBF FT TR 230/138 kV ACU II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  ACU II RTB 13,8 kV 5 MVAr ACU II RT1 RN RBF FT RTB 13,8 kV 5 MVAr ACU II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  ACU II IB 230 kV MG 230 kV ACU II MG1 RN IB1 RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  ACU II MC 230 kV TR 230/69 kV ACU II TR7 RN RBF FT TR 230/69 kV ACU II TR7 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  ACU II MC 230 kV TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  ACU II MC 230 kV TR 230/69 kV ACU II TR5 RN RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  ACU II MC 230 kV TR 230/69 kV ACU II TR4 RN RBF FT TR 230/69 kV ACU II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  ACU II MC 230 kV TR 230/138 kV ACU II TR3 RN RBF FT TR 230/138 kV ACU II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  ACU II MC 230 kV TR 230/138 kV ACU II TR2 RN RBF FT TR 230/138 kV ACU II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  ACU II EL 138 kV ACU II LT 138 kV ACU II /SAN.MATOS II C-1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  ACU II EL 138 kV ACU II  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  ACU II EL 138 kV ACU II  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  ACU II IB 230 kV MG 230 kV ACU II MG1 RN IB1 RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  ACU II MC 69 kV TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  ACU II TT 69/13,8 kV ACU II TA1 RN DIT   061/2001 IPCA RCDM REA 3578/2012 11/10/2015 10/10/2045 216,361.39
  ACU II TR 230/69 kV ACU II TR5 RN RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 217,696.01
  ACU II TR 230/69 kV ACU II TR4 RN RBF FT TR 230/69 kV ACU II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 217,696.01
  ACU II EL 69 kV ACU II  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ACU II MC 230 kV TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  ACU II MC 230 kV TR 230/138 kV ACU II TR2 RN RBF FT TR 230/138 kV ACU II TR2 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51

 

47 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  ACU II EL 230 kV ACU II LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  ACU II TR 230/69 kV ACU II TR7 RN RBF FT TR 230/69 kV ACU II TR7 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 257,282.21
  ACU II TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 257,282.21
  ACU II EL 230 kV ACU II LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  ACU II TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 355,148.36
  ACU II EL 230 kV ACU II LT 230 kV PARAISO /ACU II C-3 RN RB FT LT 230 kV PARAISO /ACU II C-3 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040 355,597.70
  ACU II EL 230 kV ACU II LT 230 kV ACU III /ACU II C-3 RN RB FT LT 230 kV ACU III /ACU II C-3 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040 355,597.70
  ACU II TR 230/138 kV ACU II TR3 RN RBF FT TR 230/138 kV ACU II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,942.44
  ACU II TR 230/138 kV ACU II TR2 RN RBF FT TR 230/138 kV ACU II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,942.44
  ACU II TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBNI REA 2968/2011 5/4/2013 4/4/2043 386,858.68
  ACU II TR 230/69 kV ACU II TR5 RN RBF FT TR 230/69 kV ACU II TR5 RN 061/2001 IPCA RBNI REA 2460/2010 8/4/2013 7/4/2043 386,941.87
  ACU II EL 230 kV ACU II LT 230 kV PARAISO /ACU II C-2 RN RB FT LT 230 kV PARAISO /ACU II C-2 RN 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 488,228.47
  ACU II MC 230 kV TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 717,522.76
  ACU II TR 230/69 kV ACU II TR6 RN RBF FT TR 230/69 kV ACU II TR6 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 779,043.74
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 990,457.26
  ACU II MG 230 kV ACU II MG1 RN RB FT MG 230 kV ACU II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,172,639.99
  ACU III MG 230 kV ACU III MG7 RN RB FT MG 230 kV ACU III MG7 RN 061/2001 IPCA RBNI DSP 1307/2022 1/7/2022 30/06/2053 38,732.30
  ACU III MG 230 kV ACU III MG6 RN RB FT MG 230 kV ACU III MG6 RN 019/2010 IPCA RBNI DSP 1269/2022 1/7/2022 30/06/2053 38,732.30
  ACU III EL 230 kV ACU III LT 230 kV MOSSORO II /ACU III C-2 RN RB FT LT 230 kV MOSSORO II /ACU III C-2 RN 019/2010 IPCA RBNI DSP 1269/2022 1/7/2022 30/06/2051 197,000.02
  ACU III EL 230 kV ACU III LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBNI DSP 1307/2022 1/7/2022 30/06/2051 197,000.02
  ACU III EL 230 kV ACU III LT 230 kV ACU III /ACU II C-3 RN RB FT LT 230 kV ACU III /ACU II C-3 RN 019/2010 IPCA RBNI DSP 1269/2022 1/7/2022 30/06/2051 197,000.02
  ACU III EL 230 kV ACU III LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBNI DSP 1307/2022 1/7/2022 30/06/2051 197,000.02
  ALEX MG 230 kV ALEX MG1 CE RB FT MG 230 kV ALEX MG1 CE 061/2001 IPCA RBNI DSP 1183/2022 1/7/2022 30/06/2040 56,185.17
  ALEX MG 230 kV ALEX MG1 CE RB FT MG 230 kV ALEX MG1 CE 061/2001 IPCA RBNI DSP 1183/2022 1/7/2022 30/06/2053 58,098.43
  ALEX IB 230 kV MG 230 kV ALEX MG1 CE IB1 RB FT MG 230 kV ALEX MG1 CE 061/2001 IPCA RBNI DSP 1183/2022 1/7/2022 30/06/2052 140,797.80
  ALEX EL 230 kV ALEX LT 230 kV BANABUIU /ALEX C-1 CE RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBNI DSP 1183/2022 1/7/2022 30/06/2051 196,013.94
  ALEX EL 230 kV ALEX LT 230 kV ALEX /MOSSORO II C-1 CE/RN RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBNI DSP 1183/2022 1/7/2022 30/06/2051 196,013.94
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RMEL REN 443/2011 2/6/2016 1/6/2046 1,940.18
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RMEL REN 443/2011 29/04/2016 28/04/2046 1,957.11
  ANGELIM EL 69 kV ANGELIM  DIST5 DIT   061/2001 IPCA RMEL REN 443/2011 2/5/2016 1/5/2030 2,305.25
  ANGELIM EL 69 kV ANGELIM  DIST6 DIT   061/2001 IPCA RMEL REN 443/2011 12/6/2016 11/6/2039 2,334.98
  ANGELIM EL 69 kV ANGELIM  DIST6 DIT   061/2001 IPCA RMEL REN 443/2011 12/6/2016 11/6/2039 2,334.98
  ANGELIM EL 69 kV ANGELIM  DIST6 DIT   061/2001 IPCA RMEL REN 443/2011 13/06/2016 12/6/2039 2,335.18
  ANGELIM EL 69 kV ANGELIM  DIST3 DIT   061/2001 IPCA RMEL REN 643/2014 27/10/2015 26/10/2029 2,384.25
  ANGELIM EL 69 kV ANGELIM  DIST2 DIT   061/2001 IPCA RMEL REN 643/2014 27/10/2015 26/10/2029 2,384.25
  ANGELIM MC 69 kV TR 69/13,8 kV ANGELIM TR4A PE DIT   061/2001 IPCA RMEL REN 643/2014 27/10/2015 26/10/2029 2,492.65
  ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RMEL REN 443/2011 18/07/2016 17/07/2046 3,873.72
  ANGELIM EL 69 kV ANGELIM  DIST2 DIT   061/2001 IPCA RMEL REN 643/2014 23/10/2015 22/10/2029 4,765.89
  ANGELIM EL 69 kV ANGELIM  DIST3 DIT   061/2001 IPCA RMEL REN 643/2014 24/10/2015 23/10/2029 4,766.55
  ANGELIM MC 69 kV TR 69/13,8 kV ANGELIM TR4A PE DIT   061/2001 IPCA RMEL REN 643/2014 26/10/2015 25/10/2029 5,190.26
  ANGELIM EL 69 kV ANGELIM  DIST8 DIT   061/2001 IPCA RMEL REN 643/2014 26/10/2015 25/10/2029 7,151.81
  ANGELIM EL 69 kV ANGELIM  DIST6 DIT   061/2001 IPCA RMEL REN 643/2014 19/10/2015 18/10/2029 9,526.52
  ANGELIM EL 69 kV ANGELIM  DIST4 DIT   061/2001 IPCA RMEL REN 643/2014 21/10/2015 20/10/2029 9,529.15
  ANGELIM EL 69 kV ANGELIM  DIST1 DIT   061/2001 IPCA RMEL REN 643/2014 20/10/2015 19/10/2029 9,636.11
  ANGELIM EL 69 kV ANGELIM  DIST7 DIT   061/2001 IPCA RMEL REN 643/2014 22/10/2015 21/10/2029 9,747.07
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RMEL REN 443/2011 4/8/2015 3/8/2045 15,517.95
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBNI REA 2837/2011 13/03/2015 12/3/2045 28,200.63
  ANGELIM TR 69/13,8 kV ANGELIM TR4B PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  ANGELIM TR 69/13,8 kV ANGELIM TR4A PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RMEL REN 443/2011 4/8/2016 3/8/2033 32,097.18
  ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 37,278.57
  ANGELIM TR 69/13,8 kV ANGELIM TR4B PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  ANGELIM EL 230 kV ANGELIM LT 230 kV SANTANA II /ANGELIM C-1 AL/PE RB FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE 061/2001 IPCA RBNI REA 2837/2011 20/03/2015 19/03/2045 42,324.13
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBNI REA 2837/2011 26/03/2015 25/03/2045 42,343.98
  ANGELIM EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-3 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE 061/2001 IPCA RBNI REA 2837/2011 14/04/2015 13/04/2045 42,406.87
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBNI REA 2837/2011 30/04/2015 29/04/2045 42,459.83
  ANGELIM IB 69 kV MG 230 kV ANGELIM MG1 PE IB3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  ANGELIM MC 13,8 kV TR 69/13,8 kV ANGELIM TR4A PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  ANGELIM EL 13,8 kV ANGELIM  PALMERINA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  ANGELIM EL 13,8 kV ANGELIM  AUXIL2 RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  ANGELIM EL 13,8 kV ANGELIM  AUXIL1 RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RMEL REN 443/2011 1/4/2016 31/03/2030 54,121.38
  ANGELIM IB 69 kV MG 230 kV ANGELIM MG1 PE IB3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  ANGELIM MC 69 kV TR 69/13,8 kV ANGELIM TR4A PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR6 PE RBF FT TR 230/69 kV ANGELIM TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ANGELIM EL 69 kV ANGELIM  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ANGELIM EL 69 kV ANGELIM  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ANGELIM EL 69 kV ANGELIM  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ANGELIM EL 69 kV ANGELIM  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ANGELIM EL 69 kV ANGELIM  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ANGELIM EL 69 kV ANGELIM  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ANGELIM EL 69 kV ANGELIM  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ANGELIM EL 69 kV ANGELIM  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ANGELIM TR 69/13,8 kV ANGELIM TR4B PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  ANGELIM TT 69/13,8 kV ANGELIM TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  ANGELIM EL 69 kV ANGELIM  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ANGELIM EL 69 kV ANGELIM  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ANGELIM EL 69 kV ANGELIM  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ANGELIM EL 69 kV ANGELIM  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ANGELIM EL 69 kV ANGELIM  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ANGELIM EL 69 kV ANGELIM  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82

 

48 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  ANGELIM TT 69/13,8 kV ANGELIM TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  ANGELIM IB 69 kV MG 230 kV ANGELIM MG1 PE IB3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  ANGELIM IB 230 kV MG 230 kV ANGELIM MG1 PE IB2 RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  ANGELIM IB 230 kV MG 230 kV ANGELIM MG1 PE IB1 RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR6 PE RBF FT TR 230/69 kV ANGELIM TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  ANGELIM IB 230 kV MG 230 kV ANGELIM MG1 PE IB1 RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  ANGELIM MC 69 kV TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  ANGELIM TT 69/13,8 kV ANGELIM TA1 PE DIT   061/2001 IPCA RCDM REA 3578/2012 27/11/2015 26/11/2045 217,038.45
  ANGELIM EL 69 kV ANGELIM  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ANGELIM EL 69 kV ANGELIM  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ANGELIM EL 69 kV ANGELIM  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ANGELIM EL 69 kV ANGELIM  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ANGELIM EL 69 kV ANGELIM  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ANGELIM EL 69 kV ANGELIM  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  ANGELIM EL 230 kV ANGELIM LT 230 kV SANTANA II /ANGELIM C-1 AL/PE RB FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  ANGELIM EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-3 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  ANGELIM EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-2 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  ANGELIM EL 230 kV ANGELIM LT 230 kV GARANHUNS II /ANGELIM C-1 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-2 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  ANGELIM TT 69/13,8 kV ANGELIM TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  ANGELIM EL 230 kV ANGELIM LT 230 kV SANTANA II /ANGELIM C-1 AL/PE RB FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-2 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  ANGELIM TR 230/69 kV ANGELIM TR6 PE RBF FT TR 230/69 kV ANGELIM TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  ANGELIM TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  ANGELIM TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  ANGELIM TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  ANGELIM TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  ANGELIM MC 230 kV TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-2 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  ANGELIM EL 230 kV ANGELIM LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 786,065.81
  ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,085,073.02
  ANGELIM TR 230/69 kV ANGELIM TR5 PE RBF FT TR 230/69 kV ANGELIM TR5 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  ANGELIM TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  ANGELIM TR 230/69 kV ANGELIM TR3 PE RBF FT TR 230/69 kV ANGELIM TR3 PE 061/2001 IPCA RMELP REA 9918/2021     1,640,029.77
  ANGELIM MG 230 kV ANGELIM MG1 PE RB FT MG 230 kV ANGELIM MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,380,186.54
  ANGELIM II EL 500 kV ANGELIM II LT 500 kV ANGELIM II /PAU FERRO C-1 PE RB FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE 061/2001 IPCA RBNI REA 5861/2016 8/6/2016 7/6/2044 27,147.36
  ANGELIM II MG 500 kV ANGELIM II MG1 PE RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RMEL REN 643/2014 17/12/2015 16/12/2032 30,542.68
  ANGELIM II MC 500 kV RTB 500 kV 150 MVAr ANGELIM II RT1 PE RB FT RTB 500 kV 150 MVAr ANGELIM II RT1 PE 061/2001 IPCA RMEL REN 643/2014 2/2/2013 1/2/2043 32,465.75
  ANGELIM II MG 500 kV ANGELIM II MG1 PE RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2043 50,733.14
  ANGELIM II MG 500 kV ANGELIM II MG1 PE RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RBNI REA 7761/2019 30/11/2021 29/11/2036 164,331.09
  ANGELIM II RTB 500 kV 50 MVAr ANGELIM II RTR1 PE RB FT RTB 500 kV 50 MVAr ANGELIM II RTR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 268,494.05
  ANGELIM II RTB 500 kV 50 MVAr ANGELIM II RTR1 PE RB FT RTB 500 kV 50 MVAr ANGELIM II RTR1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 370,625.00
  ANGELIM II MC 500 kV RTB 500 kV 150 MVAr ANGELIM II RT1 PE RB FT RTB 500 kV 150 MVAr ANGELIM II RT1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,921.40
  ANGELIM II IB 500 kV MG 500 kV ANGELIM II MG1 PE IB2 RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  ANGELIM II IB 500 kV MG 500 kV ANGELIM II MG1 PE IB1 RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  ANGELIM II EL 500 kV ANGELIM II LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  ANGELIM II EL 500 kV ANGELIM II LT 500 kV GARANHUNS II /ANGELIM II C-1 PE RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  ANGELIM II EL 500 kV ANGELIM II LT 500 kV ANGELIM II /RECIFE II C-2 PE RB FT LT 500 kV ANGELIM II /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  ANGELIM II EL 500 kV ANGELIM II LT 500 kV ANGELIM II /PAU FERRO C-1 PE RB FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  ANGELIM II RTL 500 kV 150 MVAr ANGELIM II RT3 PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 805,482.14
  ANGELIM II RTL 500 kV 150 MVAr ANGELIM II RT2 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 805,482.14
  ANGELIM II RTB 500 kV 150 MVAr ANGELIM II RT1 PE RB FT RTB 500 kV 150 MVAr ANGELIM II RT1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 805,482.14
  ANGELIM II RTL 500 kV 150 MVAr ANGELIM II RT3 PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,111,875.01
  ANGELIM II RTL 500 kV 150 MVAr ANGELIM II RT2 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,111,875.01
  ANGELIM II MG 500 kV ANGELIM II MG1 PE RB FT MG 500 kV ANGELIM II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,246,010.77
  AQUIRAZ II MG 230 kV AQUIRAZ II MG1 CE RB FT MG 230 kV AQUIRAZ II MG1 CE 004/2010 IPCA RBNI REA 7761/2019 30/09/2015 29/09/2030 22,656.40
  AQUIRAZ II MG 230 kV AQUIRAZ II MG2 CE RB FT MG 230 kV AQUIRAZ II MG2 CE 061/2001 IPCA RMEL REN 443/2011 7/10/2016 6/10/2033 34,140.08
  AQUIRAZ II MG 230 kV AQUIRAZ II MG1 CE RB FT MG 230 kV AQUIRAZ II MG1 CE 004/2010 IPCA RBNI REA 2837/2011 11/12/2013 10/12/2044 43,837.53
  AQUIRAZ II TT 69/0 kV AQUIRAZ II TT1 CE DIT   004/2010 IPCA RPEC CC 004/2010 12/7/2010 11/7/2040 56,170.67
  AQUIRAZ II MC 69 kV TT 69/0 kV AQUIRAZ II TT1 CE DIT   004/2010 IPCA RPEC CC 004/2010 12/7/2010 11/7/2040 64,040.22

 

49 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  AQUIRAZ II IB 69 kV MG 230 kV AQUIRAZ II MG1 CE IB1 DIT   004/2010 IPCA RPEC CC 004/2010 12/7/2010 11/7/2040 93,136.48
  AQUIRAZ II MG 230 kV AQUIRAZ II MG2 CE RB FT MG 230 kV AQUIRAZ II MG2 CE 061/2001 IPCA RBNI REA 3631/2012 9/11/2020 9/11/2053 113,630.53
  AQUIRAZ II MG 230 kV AQUIRAZ II MG2 CE RB FT MG 230 kV AQUIRAZ II MG2 CE 061/2001 IPCA RBNI REA 2823/2011 2/10/2020 2/10/2057 117,413.47
  AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE 061/2001 IPCA RBNI REA 10140/2021 31/12/2015 31/12/2043 147,475.09
  AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBNI REA 10140/2021 31/12/2015 31/12/2043 147,475.09
  AQUIRAZ II EL 69 kV AQUIRAZ II  DIST4 DIT   004/2010 IPCA RPEC CC 004/2010 12/7/2010 11/7/2040 165,262.30
  AQUIRAZ II EL 69 kV AQUIRAZ II  DIST3 DIT   004/2010 IPCA RPEC CC 004/2010 12/7/2010 11/7/2040 165,262.30
  AQUIRAZ II EL 69 kV AQUIRAZ II  DIST2 DIT   004/2010 IPCA RPEC CC 004/2010 12/7/2010 11/7/2040 165,262.30
  AQUIRAZ II EL 69 kV AQUIRAZ II  DIST1 DIT   004/2010 IPCA RPEC CC 004/2010 12/7/2010 11/7/2040 165,262.30
  AQUIRAZ II MC 69 kV TR 230/69 kV AQUIRAZ II TR3 CE RBF FT TR 230/69 kV AQUIRAZ II TR3 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 215,926.93
  AQUIRAZ II MC 69 kV TR 230/69 kV AQUIRAZ II TR2 CE RBF FT TR 230/69 kV AQUIRAZ II TR2 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 215,926.93
  AQUIRAZ II MC 69 kV TR 230/69 kV AQUIRAZ II TR1 CE RBF FT TR 230/69 kV AQUIRAZ II TR1 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 215,926.93
  AQUIRAZ II EL 69 kV AQUIRAZ II  EUZEBIO 3 DIT   004/2010 IPCA RCDM REA 2837/2011 11/12/2013 10/12/2037 266,044.31
  AQUIRAZ II EL 69 kV AQUIRAZ II  EUZEBIO 2 DIT   004/2010 IPCA RCDM REA 2837/2011 11/12/2013 10/12/2037 266,044.31
  AQUIRAZ II EL 69 kV AQUIRAZ II  EUZEBIO 1 DIT   004/2010 IPCA RCDM REA 2837/2011 11/12/2013 10/12/2037 266,044.31
  AQUIRAZ II IB 230 kV MG 230 kV AQUIRAZ II MG1 CE IB1 RB FT MG 230 kV AQUIRAZ II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 397,809.39
  AQUIRAZ II MC 230 kV TR 230/69 kV AQUIRAZ II TR3 CE RBF FT TR 230/69 kV AQUIRAZ II TR3 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 541,759.77
  AQUIRAZ II MC 230 kV TR 230/69 kV AQUIRAZ II TR2 CE RBF FT TR 230/69 kV AQUIRAZ II TR2 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 541,759.77
  AQUIRAZ II MC 230 kV TR 230/69 kV AQUIRAZ II TR1 CE RBF FT TR 230/69 kV AQUIRAZ II TR1 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 541,759.77
  AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBNI REA 3631/2012 6/11/2020 6/11/2045 738,059.83
  AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBNI REA 3631/2012 27/08/2021 27/08/2046 738,059.83
  AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV BANABUIU /AQUIRAZ II C-1 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE 061/2001 IPCA RBNI REA 2823/2011 2/10/2020 2/10/2049 770,708.39
  AQUIRAZ II EL 230 kV AQUIRAZ II LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBNI REA 2823/2011 2/10/2020 2/10/2049 770,708.39
  AQUIRAZ II TR 230/69 kV AQUIRAZ II TR3 CE RBF FT TR 230/69 kV AQUIRAZ II TR3 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 1,124,751.60
  AQUIRAZ II TR 230/69 kV AQUIRAZ II TR2 CE RBF FT TR 230/69 kV AQUIRAZ II TR2 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 1,124,751.60
  AQUIRAZ II TR 230/69 kV AQUIRAZ II TR1 CE RBF FT TR 230/69 kV AQUIRAZ II TR1 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 1,124,751.60
  AQUIRAZ II MG 230 kV AQUIRAZ II MG1 CE RB FT MG 230 kV AQUIRAZ II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 1,224,289.64
  ARAPIRACA III MG 230 kV ARAPIRACA III MG1 AL RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RMEL REN 443/2011 18/04/2016 17/04/2031 10,659.18
  ARAPIRACA III MG 230 kV ARAPIRACA III MG1 AL RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RBNI REN 443/2011 16/10/2016 15/10/2047 36,507.16
  ARAPIRACA III MC 230 kV RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL RB FT RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL 013/2010 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2042 74,617.15
  ARAPIRACA III RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL RB FT RTL 230 kV 15 Mvar ARAPIRACA III RT1 AL 013/2010 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2051 77,201.11
  ARAPIRACA III MG 230 kV ARAPIRACA III MG1 AL RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RMEL REN 643/2014 22/05/2015 21/05/2030 78,241.55
  ARAPIRACA III TT 69/0 kV ARAPIRACA III TT1 AL DIT   013/2010 IPCA RPEC CC 013/2010 6/10/2010 6/10/2040 78,520.59
  ARAPIRACA III MC 69 kV TT 69/0 kV ARAPIRACA III TT1 AL DIT   013/2010 IPCA RPEC CC 013/2010 6/10/2010 6/10/2040 84,886.98
  ARAPIRACA III IB 69 kV MG 230 kV ARAPIRACA III MG1 AL IB1 DIT   013/2010 IPCA RPEC CC 013/2010 6/10/2010 6/10/2040 127,499.65
  ARAPIRACA III EL 230 kV ARAPIRACA III LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2044 147,475.09
  ARAPIRACA III EL 230 kV ARAPIRACA III LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2044 147,475.09
  ARAPIRACA III MG 230 kV ARAPIRACA III MG1 AL RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RBNI REA 5211/2015 24/10/2016 24/10/2048 163,220.18
  ARAPIRACA III EL 69 kV ARAPIRACA III  DIST1 DIT   013/2010 IPCA RPEC CC 013/2010 6/10/2010 6/10/2040 220,757.17
  ARAPIRACA III MC 69 kV TR 230/69 kV ARAPIRACA III TR1 AL RBF FT TR 230/69 kV ARAPIRACA III TR1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 6/10/2040 397,458.14
  ARAPIRACA III MC 69 kV TR 230/69 kV ARAPIRACA III TR2 AL RBF FT TR 230/69 kV ARAPIRACA III TR2 AL 013/2010 IPCA RBNI REA 5211/2015 24/10/2016 24/10/2039 397,710.73
  ARAPIRACA III EL 69 kV ARAPIRACA III  ARAPIRACA II DIT   013/2010 IPCA RCDM REN 443/2011 16/10/2016 15/10/2039 426,990.08
  ARAPIRACA III BC 230 kV 30 Mvar ARAPIRACA III BC2 AL RB FT BC 230 kV 30 Mvar ARAPIRACA III BC2 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 6/10/2040 664,474.33
  ARAPIRACA III BC 230 kV 30 Mvar ARAPIRACA III BC1 AL RB FT BC 230 kV 30 Mvar ARAPIRACA III BC1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 6/10/2040 664,474.33
  ARAPIRACA III IB 230 kV MG 230 kV ARAPIRACA III MG1 AL IB1 RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 6/10/2040 739,214.51
  ARAPIRACA III MC 230 kV TR 230/69 kV ARAPIRACA III TR1 AL RBF FT TR 230/69 kV ARAPIRACA III TR1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 6/10/2040 999,505.82
  ARAPIRACA III MC 230 kV TR 230/69 kV ARAPIRACA III TR2 AL RBF FT TR 230/69 kV ARAPIRACA III TR2 AL 013/2010 IPCA RBNI REA 5211/2015 24/10/2016 24/10/2040 1,077,633.69
  ARAPIRACA III MC 230 kV BC 230 kV 30 Mvar ARAPIRACA III BC2 AL RB FT BC 230 kV 30 Mvar ARAPIRACA III BC2 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 6/10/2040 1,109,528.50
  ARAPIRACA III MC 230 kV BC 230 kV 30 Mvar ARAPIRACA III BC1 AL RB FT BC 230 kV 30 Mvar ARAPIRACA III BC1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 6/10/2040 1,109,528.50
  ARAPIRACA III TR 230/69 kV ARAPIRACA III TR2 AL RBF FT TR 230/69 kV ARAPIRACA III TR2 AL 013/2010 IPCA RBNI REA 5211/2015 24/10/2016 24/10/2050 1,418,332.83
  ARAPIRACA III MG 230 kV ARAPIRACA III MG1 AL RB FT MG 230 kV ARAPIRACA III MG1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 6/10/2040 2,239,177.26
  ARAPIRACA III TR 230/69 kV ARAPIRACA III TR1 AL RBF FT TR 230/69 kV ARAPIRACA III TR1 AL 013/2010 IPCA RBL CC 013/2010 17/06/2013 6/10/2040 2,592,192.49
  B. ESPERANCA RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI RB FT RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI 061/2001 IPCA RMELP REA 9174/2020     1,850,775.40
  B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBNI REA 8314/2019 25/05/2018 24/05/2033 8,216.62
  B. ESPERANCA RTL 500 kV 100 Mvar B. ESPERANCA RT2 PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RMEL REN 643/2014 30/01/2014 29/01/2049 10,384.56
  B. ESPERANCA EL 500 kV B. ESPERANCA LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RMEL REN 443/2011 1/8/2017 31/07/2045 15,643.04
  B. ESPERANCA EL 500 kV B. ESPERANCA LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RMEL REN 443/2011 4/6/2016 3/6/2046 17,878.97
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RMEL REN 643/2014 8/11/2014 7/11/2044 19,891.71
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RMEL REN 443/2011 21/02/2016 20/02/2044 24,408.48
  B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RMEL REN 643/2014 20/08/2014 19/08/2031 26,530.72
  B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RMEL REN 443/2011 13/01/2016 12/1/2033 30,644.91
  B. ESPERANCA MC 500 kV TR 500/230 kV B. ESPERANCA TR1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RMEL REN 443/2011 4/6/2016 3/6/2046 35,757.97
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RMEL REN 643/2014 25/05/2014 24/05/2042 38,902.99
  B. ESPERANCA MC 13,8 kV RTS 13,8 kV 5 Mvar B. ESPERANCA RT1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,914.78
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RMEL REN 643/2014 7/12/2014 6/12/2044 42,090.16
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RMEL REN 643/2014 22/09/2014 21/09/2044 59,457.47
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2031 115,676.92
  B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBNI REA 7761/2019 30/09/2015 29/09/2030 116,913.34
  B. ESPERANCA RTS 13,8 kV 5 Mvar B. ESPERANCA RT1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  B. ESPERANCA IB 230 kV MG 500 kV B. ESPERANCA MG1 PI IB1 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  B. ESPERANCA MC 230 kV TR 500/230 kV B. ESPERANCA TR1 PI MC2 RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  B. ESPERANCA MC 230 kV TR 500/230 kV B. ESPERANCA TR1 PI MC1 RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  B. ESPERANCA RTS 13,8 kV 5 Mvar B. ESPERANCA RT1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RMEL REN 643/2014 11/8/2015 10/8/2040 230,944.62
  B. ESPERANCA RTB 500 kV 33,3 Mvar B. ESPERANCA RTR2 PI RB FT RTB 500 kV 33,3 Mvar B. ESPERANCA RTR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 233,867.79
  B. ESPERANCA RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI RB FT RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 233,867.79
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  B. ESPERANCA EL 230 kV B. ESPERANCA LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  B. ESPERANCA RTB 500 kV 33,3 Mvar B. ESPERANCA RTR2 PI RB FT RTB 500 kV 33,3 Mvar B. ESPERANCA RTR2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,827.46
  B. ESPERANCA RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI RB FT RTB 500 kV 33,3 Mvar B. ESPERANCA RTR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,827.46
  B. ESPERANCA MC 500 kV RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI RB FT RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,921.40
  B. ESPERANCA MC 500 kV TR 500/230 kV B. ESPERANCA TR1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB3 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB2 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB1 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69

 

50 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  B. ESPERANCA EL 500 kV B. ESPERANCA LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  B. ESPERANCA EL 500 kV B. ESPERANCA LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  B. ESPERANCA TR 500/230 kV B. ESPERANCA TRR1 PI RB FT TR 500/230 kV B. ESPERANCA TRR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 504,801.61
  B. ESPERANCA MC 500 kV TR 500/230 kV B. ESPERANCA TR1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB2 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB1 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  B. ESPERANCA TR 500/230 kV B. ESPERANCA TRR1 PI RB FT TR 500/230 kV B. ESPERANCA TRR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 696,820.29
  B. ESPERANCA RTL 500 kV 100 Mvar B. ESPERANCA RT2 PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 701,859.07
  B. ESPERANCA RTL 500 kV 100 Mvar B. ESPERANCA RT1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 701,859.07
  B. ESPERANCA RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI RB FT RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 701,859.07
  B. ESPERANCA RTB 500 kV 33,3 Mvar B. ESPERANCA RTR2 PI RB FT RTB 500 kV 33,3 Mvar B. ESPERANCA RTR2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 708,145.50
  B. ESPERANCA RTL 500 kV 100 Mvar B. ESPERANCA RT2 PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 968,835.33
  B. ESPERANCA RTL 500 kV 100 Mvar B. ESPERANCA RT1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 968,835.33
  B. ESPERANCA RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI RB FT RTB 500 kV 100 Mvar B. ESPERANCA RT3 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 968,835.33
  B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,321,063.33
  B. ESPERANCA IB 500 kV MG 500 kV B. ESPERANCA MG1 PI IB1 RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  B. ESPERANCA TR 500/230 kV B. ESPERANCA TR1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,514,404.83
  B. ESPERANCA TR 500/230 kV B. ESPERANCA TRR1 PI RB FT TR 500/230 kV B. ESPERANCA TRR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,528,525.95
  B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,823,575.27
  B. ESPERANCA TR 500/230 kV B. ESPERANCA TR1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,090,460.86
  B. ESPERANCA MG 500 kV B. ESPERANCA MG1 PI RB FT MG 500 kV B. ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,000,144.91
  B. ESPERANCA TR 500/230 kV B. ESPERANCA TR1 PI RB FT TR 500/230 kV B. ESPERANCA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,585,577.85
  B.J.LAPA II EL 230 kV B.J.LAPA II LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA RB FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040 289,520.51
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST3 DIT   061/2001 IPCA RMEL REN 443/2011 30/08/2015 29/08/2045 8,228.85
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST3 DIT   061/2001 IPCA RMEL REN 443/2011 30/08/2015 29/08/2045 8,228.85
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST1 DIT   061/2001 IPCA RMEL REN 443/2011 22/11/2015 21/11/2045 8,282.23
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RMEL REN 643/2014 23/01/2014 22/01/2031 15,752.75
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RMEL REN 643/2014 28/11/2014 27/11/2031 16,412.91
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBNI REA 6168/2017 12/5/2021 12/5/2052 17,737.55
  B.JESUS LAPA MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RMEL REN 443/2011 2/6/2017 1/6/2047 22,528.79
  B.JESUS LAPA MC 69 kV TT 69/13,8 kV B.JESUS LAPA TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  B.JESUS LAPA MC 69 kV TT 69/0 kV B.JESUS LAPA TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RMEL REN 443/2011 27/05/2017 26/05/2051 27,658.83
  B.JESUS LAPA RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RMEL REN 443/2011 13/09/2017 12/9/2052 27,744.51
  B.JESUS LAPA IB 69 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 DIT   061/2001 IPCA RCDM REA 6168/2017 12/5/2021 12/5/2052 39,962.71
  B.JESUS LAPA IB 69 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  B.JESUS LAPA EL 230 kV B.JESUS LAPA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RMEL REN 443/2011 9/7/2017 8/7/2047 45,178.48
  B.JESUS LAPA MC 13,8 kV TR 230/69 kV B.JESUS LAPA TR2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  B.JESUS LAPA MC 13,8 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  B.JESUS LAPA MC 13,8 kV TR 13,8/0,22 kV B.JESUS LAPA TR5 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBNI REA 6168/2017 12/5/2021 12/5/2061 53,082.83
  B.JESUS LAPA MC 13,8 kV CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,856.97
  B.JESUS LAPA MC 13,8 kV RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  B.JESUS LAPA MC 13,8 kV RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBNI REA 6168/2017 12/5/2021 12/5/2053 67,447.70
  B.JESUS LAPA MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RMEL REN 443/2011 19/05/2017 18/05/2047 67,517.72
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RMEL REN 443/2011 21/05/2017 20/05/2047 67,527.53
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  B.JESUS LAPA EL 69 kV B.JESUS LAPA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  B.JESUS LAPA RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA RB FT RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,160.76
  B.JESUS LAPA MC 13,8 kV CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 86,766.78
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 87,920.89
  B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBNI REA 6168/2017 12/5/2021 12/5/2061 91,387.56
  B.JESUS LAPA TT 69/13,8 kV B.JESUS LAPA TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  B.JESUS LAPA TT 69/0 kV B.JESUS LAPA TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  B.JESUS LAPA CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBNI REA 5861/2016 30/06/2013 29/06/2042 93,991.89
  B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  B.JESUS LAPA RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA RB FT RTL 230 kV 5 Mvar B.JESUS LAPA RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 113,413.43
  B.JESUS LAPA IB 230 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  B.JESUS LAPA TT 69/13,8 kV B.JESUS LAPA TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  B.JESUS LAPA RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  B.JESUS LAPA RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 131,974.49
  B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 131,974.49
  B.JESUS LAPA MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,194.51
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  B.JESUS LAPA MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  B.JESUS LAPA IB 230 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 166,420.18
  B.JESUS LAPA TR 69/69 kV B.JESUS LAPA TREG4 BA RBF FT TR 230/69 kV B.JESUS LAPA TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,845.55
  B.JESUS LAPA TR 69/69 kV B.JESUS LAPA TREG2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,845.55
  B.JESUS LAPA RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  B.JESUS LAPA RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA RBF FT RTB 13,8 kV 5 MVAr B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  B.JESUS LAPA RTS 69 kV 40 Mvar B.JESUS LAPA RT2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 187,504.77

 

51 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  B.JESUS LAPA MC 13,8 kV CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 190,329.23
  B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR4 BA RBF FT TR 230/69 kV B.JESUS LAPA TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 191,080.06
  B.JESUS LAPA CR 230 kV 34,9 MVAr B.JESUS LAPA BC1 BA RB FT CR 230 kV 34,9 MVAr B.JESUS LAPA BC1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 194,755.81
  B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  B.JESUS LAPA RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,855.62
  B.JESUS LAPA MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 201,804.63
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  B.JESUS LAPA MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 217,696.01
  B.JESUS LAPA EL 230 kV B.JESUS LAPA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  B.JESUS LAPA EL 230 kV B.JESUS LAPA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR2 BA RBF FT TR 230/69 kV B.JESUS LAPA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,450.72
  B.JESUS LAPA RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 246,482.27
  B.JESUS LAPA RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 246,482.27
  B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 257,282.21
  B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 289,495.64
  B.JESUS LAPA MC 230 kV RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 289,495.64
  B.JESUS LAPA TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 300,504.19
  B.JESUS LAPA EL 230 kV B.JESUS LAPA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA T5 BA RBF FT TR 230/69 kV B.JESUS LAPA T5 BA 061/2001 IPCA RBNI REA 6168/2017 16/12/2019 16/12/2042 306,809.63
  B.JESUS LAPA TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 332,165.72
  B.JESUS LAPA RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 340,240.29
  B.JESUS LAPA RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA RB FT RTL 230 kV 15 Mvar B.JESUS LAPA RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 340,240.29
  B.JESUS LAPA IB 230 kV MG 230 kV B.JESUS LAPA MG1 BA IB1 RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 365,054.76
  B.JESUS LAPA MC 69 kV TR 230/69 kV B.JESUS LAPA TR4 BA RBF FT TR 230/69 kV B.JESUS LAPA TR4 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042 406,480.44
  B.JESUS LAPA MC 230 kV RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA RB FT RTB 230 kV 10 Mvar B.JESUS LAPA RT3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 442,673.12
  B.JESUS LAPA TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 458,516.38
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR3 BA RBF FT TR 230/69 kV B.JESUS LAPA TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR1 BA RBF FT TR 230/69 kV B.JESUS LAPA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  B.JESUS LAPA MC 230 kV TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2013 19/12/2027 500,217.05
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 603,849.76
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA T5 BA RBF FT TR 230/69 kV B.JESUS LAPA T5 BA 061/2001 IPCA RBNI REA 6168/2017 16/12/2019 16/12/2042 660,168.29
  B.JESUS LAPA EL 230 kV B.JESUS LAPA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 833,544.81
  B.JESUS LAPA CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 853,970.28
  B.JESUS LAPA TR 230/13,8 kV B.JESUS LAPA TR6 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,005,789.02
  B.JESUS LAPA MC 230 kV TR 230/69 kV B.JESUS LAPA TR4 BA RBF FT TR 230/69 kV B.JESUS LAPA TR4 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042 1,042,992.67
  B.JESUS LAPA CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,178,807.29
  B.JESUS LAPA TR 230/69 kV B.JESUS LAPA T5 BA RBF FT TR 230/69 kV B.JESUS LAPA T5 BA 061/2001 IPCA RBNI REA 6168/2017 16/12/2019 16/12/2053 1,551,388.50
  B.JESUS LAPA MG 230 kV B.JESUS LAPA MG1 BA RB FT MG 230 kV B.JESUS LAPA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,828,441.13
  B.JESUS LAPA CS 30/-15 MVAr B.JESUS LAPA CS1 BA RB FT CS 30/-15 MVAr B.JESUS LAPA CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,585,799.48
  BANABUIU MG 230 kV BANABUIU MG1 CE RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBNI REA 5809/2016 5/7/2020 5/7/2051 18,265.66
  BANABUIU MC 69 kV TR 69/13,8 kV BANABUIU TR7 CE DIT   061/2001 IPCA RCDM REA 6845/2018 1/1/2021 31/12/2053 21,055.01
  BANABUIU MC 13,8 kV TR 69/13,8 kV BANABUIU TR7 CE DIT   061/2001 IPCA RMEL REN 443/2011 8/12/2017 7/12/2049 26,365.64
  BANABUIU TR 69/13,8 kV BANABUIU TR7 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  BANABUIU TR 69/13,8 kV BANABUIU TR4 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  BANABUIU EL 69 kV BANABUIU  DIST6 DIT   061/2001 IPCA RCDM REA 3817/2013 15/07/2013 14/07/2041 29,873.65
  BANABUIU EL 69 kV BANABUIU  DIST5 DIT   061/2001 IPCA RCDM REA 3817/2013 15/07/2013 14/07/2041 29,873.65
  BANABUIU MG 230 kV BANABUIU MG1 CE RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RMEL REN 643/2014 19/09/2013 18/09/2030 30,967.13
  BANABUIU MG 230 kV BANABUIU MG1 CE RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RMEL REN 443/2011 30/09/2016 29/09/2033 32,317.68
  BANABUIU EL 69 kV BANABUIU  DIST6 DIT   061/2001 IPCA RCDM REA 5484/2015 16/08/2020 15/08/2050 37,187.43
  BANABUIU EL 230 kV BANABUIU LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RMEL REN 643/2014 26/11/2013 25/11/2041 38,305.19
  BANABUIU MC 13,8 kV TR 69/13,8 kV BANABUIU TR7 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  BANABUIU EL 13,8 kV BANABUIU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  BANABUIU RTB 230 kV 3,33 MVAr BANABUIU RTR1 CE RB FT RTB 230 kV 3,33 MVAr BANABUIU RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,763.78
  BANABUIU MC 69 kV TR 69/13,8 kV BANABUIU TR7 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  BANABUIU MC 69 kV TR 230/69 kV BANABUIU TR3 CE RBF FT TR 230/69 kV BANABUIU TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  BANABUIU MC 69 kV TR 230/69 kV BANABUIU TR1 CE RBF FT TR 230/69 kV BANABUIU TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  BANABUIU MG 230 kV BANABUIU MG1 CE RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBNI REA 2823/2011 23/09/2019 23/09/2052 75,302.95
  BANABUIU EL 69 kV BANABUIU  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BANABUIU EL 69 kV BANABUIU  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BANABUIU EL 69 kV BANABUIU  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BANABUIU EL 69 kV BANABUIU  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BANABUIU EL 69 kV BANABUIU  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BANABUIU EL 69 kV BANABUIU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BANABUIU TT 69/13,8 kV BANABUIU TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  BANABUIU EL 69 kV BANABUIU  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RMEL REN 443/2011 16/05/2017 15/05/2049 118,858.78
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RMEL REN 443/2011 14/07/2017 13/07/2049 119,336.02
  BANABUIU IB 230 kV MG 230 kV BANABUIU MG1 CE IB1 RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  BANABUIU MC 69 kV TT 69/0 kV BANABUIU TT2 CE DIT   061/2001 IPCA RCDM REA 5809/2016 6/7/2020 6/7/2040 125,291.16
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBNI REA 3631/2012 6/11/2020 6/11/2045 140,690.16
  BANABUIU MC 230 kV RTB 230 kV 20 MVAr BANABUIU RT4 CE RB FT RTB 230 kV 20 MVAr BANABUIU RT4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,194.51
  BANABUIU MC 230 kV TR 230/69 kV BANABUIU TR3 CE RBF FT TR 230/69 kV BANABUIU TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BANABUIU MC 230 kV TR 230/69 kV BANABUIU TR1 CE RBF FT TR 230/69 kV BANABUIU TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BANABUIU IB 230 kV MG 230 kV BANABUIU MG1 CE IB1 RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 166,420.18
  BANABUIU RTS 13,8 kV 18,75 Mvar BANABUIU RT1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 166,731.77
  BANABUIU RTL 230 kV 10 MVAr BANABUIU RT3 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  BANABUIU RTL 230 kV 10 MVAr BANABUIU RT2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  BANABUIU RTL 230 kV 10 Mvar BANABUIU RT1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 173,549.34
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 173,549.34
  BANABUIU IB 69 kV MG 230 kV BANABUIU MG1 CE IB1 DIT   061/2001 IPCA RCDM REA 5809/2016 6/7/2020 6/7/2048 182,625.37
  BANABUIU RTS 69 kV 40 MVAr BANABUIU RT2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 187,504.77

 

52 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  BANABUIU RTS 69 kV 40 MVAr BANABUIU RT1 CE RBF FT TR 230/69 kV BANABUIU TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 187,504.77
  BANABUIU TR 230/69 kV BANABUIU TR1 CE RBF FT TR 230/69 kV BANABUIU TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 191,080.06
  BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,444.63
  BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,444.63
  BANABUIU EL 230 kV BANABUIU LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BANABUIU EL 230 kV BANABUIU LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /RUSSAS II C-1 CE RB FT LT 230 kV BANABUIU /RUSSAS II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /ICO C-1 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-1 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /ALEX C-1 CE RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BANABUIU EL 230 kV BANABUIU  LIBRA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BANABUIU RTB 230 kV 20 MVAr BANABUIU RT4 CE RB FT RTB 230 kV 20 MVAr BANABUIU RT4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 225,193.73
  BANABUIU EL 69 kV BANABUIU  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  BANABUIU RTL 230 kV 10 MVAr BANABUIU RT3 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 235,326.42
  BANABUIU RTL 230 kV 10 MVAr BANABUIU RT2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 235,326.42
  BANABUIU MC 230 kV TR 230/69 kV BANABUIU TR4 CE RBF FT TR 230/69 kV BANABUIU TR4 CE 061/2001 IPCA RBNI REA 2823/2011 23/09/2019 23/09/2053 238,249.18
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 239,564.81
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 239,564.81
  BANABUIU MC 69 kV TR 230/69 kV BANABUIU TR4 CE RBF FT TR 230/69 kV BANABUIU TR4 CE 061/2001 IPCA RBNI REA 2823/2011 23/09/2019 23/09/2053 239,716.14
  BANABUIU TR 230/69 kV BANABUIU TR3 CE RBF FT TR 230/69 kV BANABUIU TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 257,282.21
  BANABUIU RTS 69 kV 40 MVAr BANABUIU RT2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 258,828.67
  BANABUIU MC 230 kV TR 230/69 kV BANABUIU TR1 CE RBF FT TR 230/69 kV BANABUIU TR1 CE 061/2001 IPCA RBNI REA 5484/2015 23/09/2021 22/09/2054 262,665.50
  BANABUIU TT 69/0 kV BANABUIU TT2 CE DIT   061/2001 IPCA RCDM REA 5809/2016 6/7/2020 6/7/2050 262,925.28
  BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,310.27
  BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,310.27
  BANABUIU MC 69 kV TR 230/69 kV BANABUIU TR2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBNI REA 5809/2016 13/06/2020 13/06/2042 291,781.33
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /ALEX C-1 CE RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  BANABUIU IB 230 kV MG 230 kV BANABUIU MG1 CE IB1 RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 365,054.76
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBNI REA 2823/2011 2/10/2020 2/10/2054 369,150.12
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBNI REA 2823/2011 29/07/2019 29/07/2053 453,166.67
  BANABUIU RTL 230 kV 10 MVAr BANABUIU RT2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 516,205.60
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 525,502.83
  BANABUIU MC 230 kV BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 525,502.83
  BANABUIU EL 230 kV BANABUIU LT 230 kV RUSSAS II /BANABUIU C-1 CE RB FT LT 230 kV RUSSAS II /BANABUIU C-1 CE 018/2012 IPCA RBL CC 018/2012 15/12/2020 1/6/2042 537,773.26
  BANABUIU RTS 69 kV 40 MVAr BANABUIU RT2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 567,759.49
  BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC2 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 603,913.08
  BANABUIU BC 230 kV 50,5 MVAr BANABUIU BC1 CE RB FT BC 230 kV 50,5 MVAr BANABUIU BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 603,913.08
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /ALEX C-1 CE RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  BANABUIU MC 230 kV TR 230/69 kV BANABUIU TR2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBNI REA 5809/2016 13/06/2020 13/06/2043 675,678.33
  BANABUIU MG 230 kV BANABUIU MG1 CE RB FT MG 230 kV BANABUIU MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 737,945.91
  BANABUIU EL 230 kV BANABUIU LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN 061/2001 IPCA RBNI REA 2173/2009 6/6/2016 5/6/2046 1,263,843.92
  BANABUIU TR 230/69 kV BANABUIU TR4 CE RBF FT TR 230/69 kV BANABUIU TR4 CE 061/2001 IPCA RBNI REA 2823/2011 23/09/2019 23/09/2059 1,380,356.49
  BANABUIU TR 230/69 kV BANABUIU TR2 CE RBF FT TR 230/69 kV BANABUIU TR2 CE 061/2001 IPCA RBNI REA 5809/2016 13/06/2020 13/06/2054 1,601,467.26
  BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2013 19/12/2027 25,828.45
  BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 14/02/2014 13/02/2031 26,436.35
  BARREIRAS MC 69 kV TT 69/13,8 kV BARREIRAS TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 9/12/2015 8/12/2032 31,172.65
  BARREIRAS EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBNI REA 5861/2016 19/04/2014 18/04/2042 35,637.49
  BARREIRAS IB 69 kV MG 230 kV BARREIRAS MG1 BA IB3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 31/03/2015 30/03/2043 49,263.26
  BARREIRAS MC 69 kV TR 230/69 kV BARREIRAS TR2 BA RBF FT TR 230/69 kV BARREIRAS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  BARREIRAS MC 69 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  BARREIRAS EL 69 kV BARREIRAS  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BARREIRAS EL 69 kV BARREIRAS  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BARREIRAS EL 69 kV BARREIRAS  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BARREIRAS EL 69 kV BARREIRAS  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BARREIRAS MC 69 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  BARREIRAS IB 138 kV MG 230 kV BARREIRAS MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,365.85
  BARREIRAS TT 69/13,8 kV BARREIRAS TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  BARREIRAS IB 230 kV MG 230 kV BARREIRAS MG1 BA IB1 RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RBNI REA 5824/2016 14/11/2018 14/11/2051 95,583.15
  BARREIRAS MC 230 kV RTB 230 kV 10 Mvar BARREIRAS RT2 BA RB FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  BARREIRAS EL 69 kV BARREIRAS  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  BARREIRAS EL 69 kV BARREIRAS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  BARREIRAS EL 69 kV BARREIRAS  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  BARREIRAS EL 69 kV BARREIRAS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  BARREIRAS MC 138 kV TR 230/138 kV BARREIRAS TR4 BA RBF FT TR 230/138 kV BARREIRAS TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  BARREIRAS MC 138 kV TR 230/138 kV BARREIRAS TR3 BA RBF FT TR 230/138 kV BARREIRAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  BARREIRAS IB 230 kV MG 230 kV BARREIRAS MG1 BA IB1 RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  BARREIRAS MC 230 kV TR 230/69 kV BARREIRAS TR2 BA RBF FT TR 230/69 kV BARREIRAS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BARREIRAS MC 230 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BARREIRAS MC 230 kV TR 230/138 kV BARREIRAS TR4 BA RBF FT TR 230/138 kV BARREIRAS TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BARREIRAS MC 230 kV TR 230/138 kV BARREIRAS TR3 BA RBF FT TR 230/138 kV BARREIRAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BARREIRAS RTB 230 kV 10 Mvar BARREIRAS RT2 BA RB FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  BARREIRAS EL 138 kV BARREIRAS  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  BARREIRAS EL 138 kV BARREIRAS  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  BARREIRAS MC 69 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  BARREIRAS TR 230/138 kV BARREIRAS TRR1 BA RBF FT TR 230/138 kV BARREIRAS TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,007.61
  BARREIRAS MC 230 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  BARREIRAS EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BARREIRAS EL 69 kV BARREIRAS  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  BARREIRAS EL 69 kV BARREIRAS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  BARREIRAS EL 69 kV BARREIRAS  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  BARREIRAS EL 69 kV BARREIRAS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  BARREIRAS RTB 230 kV 10 Mvar BARREIRAS RT2 BA RB FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 235,326.42

 

53 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  BARREIRAS EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  BARREIRAS TT 69/13,8 kV BARREIRAS TA1 BA DIT   061/2001 IPCA RCDM REA 4347/2013 7/5/2017 6/5/2053 332,630.89
  BARREIRAS TR 230/69 kV BARREIRAS TR2 BA RBF FT TR 230/69 kV BARREIRAS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  BARREIRAS TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  BARREIRAS TR 230/138 kV BARREIRAS TR4 BA RBF FT TR 230/138 kV BARREIRAS TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,942.44
  BARREIRAS TR 230/138 kV BARREIRAS TR3 BA RBF FT TR 230/138 kV BARREIRAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,942.44
  BARREIRAS MC 230 kV RTB 230 kV 10 Mvar BARREIRAS RT2 BA RB FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA 061/2001 IPCA RBNI REA 5824/2016 12/10/2018 12/10/2040 412,087.06
  BARREIRAS MC 230 kV TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  BARREIRAS TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  BARREIRAS RTB 230 kV 10 Mvar BARREIRAS RT2 BA RB FT RTB 230 kV 10 Mvar BARREIRAS RT2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 516,205.60
  BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 624,650.70
  BARREIRAS EL 230 kV BARREIRAS LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 862,258.11
  BARREIRAS TR 230/69 kV BARREIRAS TR1 BA RBF FT TR 230/69 kV BARREIRAS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  BARREIRAS MG 230 kV BARREIRAS MG1 BA RB FT MG 230 kV BARREIRAS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,891,425.84
  BARREIRAS II MG 230 kV BARREIRAS II MG2 BA RB FT MG 230 kV BARREIRAS II MG2 BA 061/2001 IPCA RBNI REA 5824/2016 11/6/2019 11/6/2049 15,734.82
  BARREIRAS II RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA RB FT RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,763.78
  BARREIRAS II RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA RB FT RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 78,355.85
  BARREIRAS II MC 230 kV RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  BARREIRAS II RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA RB FT RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA 061/2001 IPCA RBNI REA 5824/2016 11/6/2019 11/6/2051 111,122.56
  BARREIRAS II MC 230 kV RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 131,974.49
  BARREIRAS II EL 230 kV BARREIRAS II LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA RB FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA 061/2001 IPCA RBNI REA 9680/2021 19/11/2019 18/11/2047 147,475.09
  BARREIRAS II EL 230 kV BARREIRAS II LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBNI REA 9680/2021 19/11/2019 18/11/2047 147,475.09
  BARREIRAS II RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  BARREIRAS II RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA RB FT RTL 230 kV 3,33 Mvar BARREIRAS II RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 171,879.24
  BARREIRAS II RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 235,326.42
  BARREIRAS II MC 230 kV RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBNI REA 5824/2016 11/6/2019 11/6/2037 259,913.07
  BARREIRAS II RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBNI REA 5824/2016 11/6/2019 11/6/2051 333,367.69
  BARREIRAS II MG 230 kV BARREIRAS II MG2 BA RB FT MG 230 kV BARREIRAS II MG2 BA 061/2001 IPCA RBNI REA 5824/2016 11/6/2019 11/6/2038 382,838.87
  BARREIRAS II RTL 230 kV 10 Mvar BARREIRAS II RT1 BA RB FT RTL 230 kV 10 Mvar BARREIRAS II RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 516,205.60
  BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RMEL REN 643/2014 2/7/2015 1/7/2045 2,935.50
  BOM NOME MC 13,8 kV TR 69/13,8 kV BOM NOME TR3A PE DIT   061/2001 IPCA RCDM REA 2040/2009 30/09/2012 29/09/2042 8,743.15
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBNI REA 12075/2022 1/7/2022 30/06/2053 19,366.15
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 643/2014 19/07/2013 18/07/2030 25,685.67
  BOM NOME MC 69 kV TT 69/13,8 kV BOM NOME TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  BOM NOME TR 69/13,8 kV BOM NOME TR3B PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  BOM NOME TR 69/13,8 kV BOM NOME TR3A PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  BOM NOME IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 DIT   061/2001 IPCA RCDM REA 5166/2015 6/6/2018 6/6/2049 30,019.25
  BOM NOME MC 69 kV TR 230/69 kV BOM NOME TR1 PE RBF FT TR 230/69 kV BOM NOME TR1 PE 061/2001 IPCA RMEL REN 643/2014 24/05/2013 23/05/2046 30,508.31
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 32,197.76
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 643/2014 17/12/2015 16/12/2032 34,466.60
  BOM NOME IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 443/2011 5/3/2016 4/3/2030 46,051.68
  BOM NOME MC 13,8 kV TR 69/13,8 kV BOM NOME TR3A PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 643/2014 31/01/2015 30/01/2043 49,021.53
  BOM NOME EL 13,8 kV BOM NOME  01Y3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  BOM NOME EL 13,8 kV BOM NOME  01Y2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  BOM NOME EL 13,8 kV BOM NOME  01Y1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  BOM NOME MC 69 kV TR 69/13,8 kV BOM NOME TR3B PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  BOM NOME IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  BOM NOME MC 69 kV TR 69/13,8 kV BOM NOME TR3A PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  BOM NOME MC 69 kV TR 230/69 kV BOM NOME TR2 PE RBF FT TR 230/69 kV BOM NOME TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  BOM NOME MC 69 kV TR 230/69 kV BOM NOME TR1 PE RBF FT TR 230/69 kV BOM NOME TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  BOM NOME EL 69 kV BOM NOME  VAGO1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BOM NOME EL 69 kV BOM NOME  VAGO (CELPE) DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BOM NOME EL 69 kV BOM NOME  SERRA TALHADA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BOM NOME EL 69 kV BOM NOME  SALGUEIRO DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/12/2013 29/12/2041 79,941.47
  BOM NOME IB 138 kV MG 230 kV BOM NOME MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,365.85
  BOM NOME TT 69/13,8 kV BOM NOME TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-1 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 643/2014 10/9/2013 9/9/2046 104,040.42
  BOM NOME MC 230 kV TR 230/69 kV BOM NOME TR2 PE RBF FT TR 230/69 kV BOM NOME TR2 PE 061/2001 IPCA RMEL REN 643/2014 20/09/2013 19/09/2046 104,118.03
  BOM NOME EL 230 kV BOM NOME LT 230 kV FLORESTA II /BOM NOME C-1 PE RB FT LT 230 kV FLORESTA II /BOM NOME C-1 PE 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2046 104,195.66
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBNI REA 5166/2015 6/6/2018 6/6/2051 107,892.85
  BOM NOME MC 138 kV TR 230/138 kV BOM NOME TR6 PE RBF FT TR 230/138 kV BOM NOME TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  BOM NOME MC 138 kV TR 230/138 kV BOM NOME TR5 PE RBF FT TR 230/138 kV BOM NOME TR5 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  BOM NOME MC 138 kV TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBNI REA 3229/2011 30/01/2013 29/01/2041 119,579.82
  BOM NOME IB 230 kV MG 230 kV BOM NOME MG1 PE IB1 RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  BOM NOME IB 69 kV MG 230 kV BOM NOME MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  BOM NOME MC 230 kV TR 230/69 kV BOM NOME TR2 PE RBF FT TR 230/69 kV BOM NOME TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BOM NOME MC 230 kV TR 230/69 kV BOM NOME TR1 PE RBF FT TR 230/69 kV BOM NOME TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BOM NOME MC 230 kV TR 230/138 kV BOM NOME TR6 PE RBF FT TR 230/138 kV BOM NOME TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BOM NOME MC 230 kV TR 230/138 kV BOM NOME TR5 PE RBF FT TR 230/138 kV BOM NOME TR5 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BOM NOME MC 230 kV TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BOM NOME IB 230 kV MG 230 kV BOM NOME MG1 PE IB1 RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 166,420.18
  BOM NOME EL 138 kV BOM NOME  SALGUEIRO 03C2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  BOM NOME EL 138 kV BOM NOME  FLORES-03C1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  BOM NOME MC 69 kV TR 230/69 kV BOM NOME TR1 PE RBF FT TR 230/69 kV BOM NOME TR1 PE 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2047 195,433.91
  BOM NOME EL 230 kV BOM NOME  TRANSPOSICAO N3 DIT   061/2001 IPCA RCDM REA 12075/2022 1/7/2022 30/06/2051 196,747.94
  BOM NOME MC 69 kV TR 230/69 kV BOM NOME TR2 PE RBF FT TR 230/69 kV BOM NOME TR2 PE 061/2001 IPCA RBNI REA 5166/2015 8/2/2018 7/2/2039 197,618.99
  BOM NOME MC 230 kV TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  BOM NOME EL 230 kV BOM NOME LT 230 kV TACARUTU /BOM NOME C-1 PE RB FT LT 230 kV TACARUTU /BOM NOME C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BOM NOME EL 230 kV BOM NOME LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BOM NOME EL 230 kV BOM NOME LT 230 kV FLORESTA II /BOM NOME C-1 PE RB FT LT 230 kV FLORESTA II /BOM NOME C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88

 

54 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-1 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBNI REA 5166/2015 6/6/2018 6/6/2058 231,511.90
  BOM NOME EL 230 kV BOM NOME LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  BOM NOME EL 230 kV BOM NOME LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  BOM NOME IB 230 kV MG 230 kV BOM NOME MG1 PE IB1 RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 365,054.76
  BOM NOME TR 230/138 kV BOM NOME TR6 PE RBF FT TR 230/138 kV BOM NOME TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,942.44
  BOM NOME TR 230/138 kV BOM NOME TR5 PE RBF FT TR 230/138 kV BOM NOME TR5 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,942.44
  BOM NOME TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,942.44
  BOM NOME TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 532,748.94
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 774,611.78
  BOM NOME EL 138 kV BOM NOME  SALGUEIRO-03C3 DIT   061/2001 IPCA RCDM REA 3229/2011 30/01/2013 29/01/2043 893,127.22
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,069,262.05
  BOM NOME TR 230/138 kV BOM NOME TR4 PE RBF FT TR 230/138 kV BOM NOME TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,168,623.52
  BOM NOME TR 230/69 kV BOM NOME TR2 PE RBF FT TR 230/69 kV BOM NOME TR2 PE 061/2001 IPCA RBNI REA 5166/2015 8/2/2018 7/2/2053 1,345,766.77
  BOM NOME TR 230/69 kV BOM NOME TR1 PE RBF FT TR 230/69 kV BOM NOME TR1 PE 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2051 1,434,114.84
  BOM NOME MG 230 kV BOM NOME MG1 PE RB FT MG 230 kV BOM NOME MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,345,504.03
  BONGI EL 69 kV BONGI  RETIRO 02J1 DIT   061/2001 IPCA RMEL REN 643/2014 25/05/2015 24/05/2029 403.49
  BONGI EL 69 kV BONGI  TAMARIN 02J2 DIT   061/2001 IPCA RMEL REN 643/2014 26/05/2015 25/05/2029 403.55
  BONGI EL 69 kV BONGI  VARZEA 02J3 DIT   061/2001 IPCA RMEL REN 643/2014 27/05/2015 26/05/2029 403.61
  BONGI EL 69 kV BONGI  VARZEA 02J3 DIT   061/2001 IPCA RMEL REN 643/2014 28/05/2015 27/05/2029 403.65
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 6/6/2017 5/6/2047 406.52
  BONGI IB 230 kV MG 230 kV BONGI MG1 PE IB1 RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 26/07/2017 25/07/2047 407.03
  BONGI IB 230 kV MG 230 kV BONGI MG1 PE IB1 RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 26/07/2017 25/07/2047 407.03
  BONGI EL 69 kV BONGI  IMBIRI 02L1 DIT   061/2001 IPCA RMEL REN 643/2014 28/05/2015 27/05/2045 551.96
  BONGI EL 69 kV BONGI  TAMARIN 02J2 DIT   061/2001 IPCA RMEL REN 443/2011 18/04/2016 17/04/2046 821.08
  BONGI TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RMEL REN 443/2011 7/4/2016 6/4/2046 1,341.70
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-2 PE RB FT LT 230 kV BONGI /JOAIRAM C-2 PE 061/2001 IPCA RMEL REN 443/2011 8/4/2016 7/4/2046 1,341.80
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-1 PE RB FT LT 230 kV BONGI /JOAIRAM C-1 PE 061/2001 IPCA RMEL REN 443/2011 7/4/2016 6/4/2046 1,751.90
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-3 PE RB FT LT 230 kV BONGI /JOAIRAM C-3 PE 061/2001 IPCA RMEL REN 443/2011 8/4/2016 7/4/2046 1,752.05
  BONGI MC 230 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RMEL REN 443/2011 4/6/2017 3/6/2047 5,646.68
  BONGI EL 69 kV BONGI  RIO JORDAO 02J5 DIT   061/2001 IPCA RCDM REA 1814/2009 3/8/2014 2/8/2044 14,664.97
  BONGI EL 69 kV BONGI  GAZ-PINA 02J7 DIT   061/2001 IPCA RCDM REA 1814/2009 27/09/2014 26/09/2044 14,729.19
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 14,969.30
  BONGI MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RCDM REA 5861/2016 27/03/2015 26/03/2043 21,453.22
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBNI REA 2376/2010 6/5/2012 5/5/2045 21,692.51
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBNI REA 2376/2010 6/5/2012 5/5/2026 24,795.39
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 643/2014 4/7/2013 3/7/2030 25,632.03
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 28/03/2016 27/03/2030 29,137.79
  BONGI EL 69 kV BONGI  VARZEA 02J4 DIT   061/2001 IPCA RCDM REA 2376/2010 14/09/2014 13/09/2044 29,812.20
  BONGI EL 69 kV BONGI  RIO JORDAO 02J5 DIT   061/2001 IPCA RCDM REA 2376/2010 14/09/2014 13/09/2044 29,812.20
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 643/2014 6/9/2013 5/9/2030 30,911.59
  BONGI IB 13,8 kV MG 230 kV BONGI MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,948.27
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 32,197.76
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBNI REA 1814/2009 1/1/2013 31/12/2045 32,432.33
  BONGI EL 69 kV BONGI  RETIRO 02J1 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2046 32,504.02
  BONGI EL 69 kV BONGI  IMBIRI 02L2 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046 32,504.02
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 18/11/2016 17/11/2033 33,731.28
  BONGI EL 69 kV BONGI  GAZ-PINA 02J7 DIT   061/2001 IPCA RCDM REA 1814/2009 1/11/2013 31/10/2045 35,694.19
  BONGI EL 69 kV BONGI  VARZEA 02J4 DIT   061/2001 IPCA RCDM REA 1814/2009 18/11/2013 17/11/2045 35,739.50
  BONGI EL 69 kV BONGI  TAMARIN 02J2 DIT   061/2001 IPCA RCDM REA 1814/2009 12/12/2013 11/12/2045 35,803.45
  BONGI EL 69 kV BONGI  RIO JORDAO 02J5 DIT   061/2001 IPCA RCDM REA 1814/2009 12/12/2013 11/12/2045 35,803.45
  BONGI MC 69 kV TR 230/69 kV BONGI TR3 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBNI REA 2040/2009 29/01/2014 28/01/2046 35,931.37
  BONGI MC 69 kV TR 230/69 kV BONGI TR1 PE RBF FT TR 230/69 kV BONGI TR1 PE 061/2001 IPCA RBNI REA 2040/2009 12/2/2014 11/2/2046 35,968.68
  BONGI EL 69 kV BONGI  VARZEA 02J3 DIT   061/2001 IPCA RCDM REA 2040/2009 25/02/2014 24/02/2046 36,003.33
  BONGI MC 69 kV TR 230/69 kV BONGI TR2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBNI REA 2040/2009 28/03/2014 27/03/2046 36,085.93
  BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  BONGI IB 13,8 kV MG 230 kV BONGI MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 44,100.90
  BONGI MC 13,8 kV TR 230/13,8 kV BONGI TR7 PE RBF FT TR 230/13,8 kV BONGI TR7 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  BONGI MC 13,8 kV TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  BONGI MC 13,8 kV TR 13,8/0,22 kV BONGI TR3 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  BONGI MC 13,8 kV TR 13,8/0,22 kV BONGI TR2 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  BONGI MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RCDM REA 7761/2019 6/4/2018 5/4/2054 49,203.96
  BONGI EL 13,8 kV BONGI  DIST9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  BONGI EL 13,8 kV BONGI  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  BONGI EL 13,8 kV BONGI  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  BONGI EL 13,8 kV BONGI  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  BONGI EL 13,8 kV BONGI  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  BONGI EL 13,8 kV BONGI  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  BONGI EL 13,8 kV BONGI  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  BONGI EL 13,8 kV BONGI  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  BONGI EL 13,8 kV BONGI  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  BONGI EL 13,8 kV BONGI  DIS11 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  BONGI EL 13,8 kV BONGI  DIS10 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  BONGI MC 230 kV TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RMEL REN 643/2014 16/02/2014 15/02/2044 61,694.04
  BONGI MC 69 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  BONGI MC 69 kV TR 230/69 kV BONGI TR3 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  BONGI MC 69 kV TR 230/69 kV BONGI TR2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  BONGI MC 69 kV TR 230/69 kV BONGI TR1 PE RBF FT TR 230/69 kV BONGI TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  BONGI MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  BONGI EL 69 kV BONGI  VARZEA 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BONGI EL 69 kV BONGI  VARZEA 02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BONGI EL 69 kV BONGI  TAMARIN 02J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25

 

55 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  BONGI EL 69 kV BONGI  RIO JORDAO 02J5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BONGI EL 69 kV BONGI  RETIRO 02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BONGI EL 69 kV BONGI  IMBIRI 02L2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BONGI EL 69 kV BONGI  IMBIRI 02L1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BONGI EL 69 kV BONGI  GAZ-PORT 02L6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BONGI EL 69 kV BONGI  GAZ-PINA 02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BONGI EL 69 kV BONGI  GAZ 02L5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  BONGI MC 69 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  BONGI TT 69/13,8 kV BONGI TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  BONGI TT 69/13,8 kV BONGI TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  BONGI BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2033 97,345.38
  BONGI MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  BONGI EL 69 kV BONGI  VARZEA 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  BONGI EL 69 kV BONGI  VARZEA 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  BONGI EL 69 kV BONGI  RETIRO 02J1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  BONGI EL 69 kV BONGI  IMBIRI 02L2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  BONGI BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,338.74
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-1 PE RB FT LT 230 kV BONGI /JOAIRAM C-1 PE 061/2001 IPCA RMEL REN 443/2011 19/11/2017 18/11/2049 120,371.40
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-2 PE RB FT LT 230 kV BONGI /JOAIRAM C-2 PE 061/2001 IPCA RMEL REN 443/2011 10/12/2017 9/12/2049 120,541.25
  BONGI IB 230 kV MG 230 kV BONGI MG1 PE IB1 RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  BONGI TT 69/13,8 kV BONGI TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  BONGI TT 69/13,8 kV BONGI TA1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  BONGI RTS 13,8 kV 5 MVAr BONGI RT2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  BONGI RTS 13,8 kV 5 MVAr BONGI RT1 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  BONGI IB 69 kV MG 230 kV BONGI MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  BONGI MC 230 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BONGI MC 230 kV TR 230/69 kV BONGI TR3 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BONGI MC 230 kV TR 230/69 kV BONGI TR2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BONGI MC 230 kV TR 230/69 kV BONGI TR1 PE RBF FT TR 230/69 kV BONGI TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BONGI MC 230 kV TR 230/13,8 kV BONGI TR7 PE RBF FT TR 230/13,8 kV BONGI TR7 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BONGI MC 230 kV TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  BONGI RTS 13,8 kV 5 MVAr BONGI RT2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  BONGI RTS 13,8 kV 5 MVAr BONGI RT1 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2030 196,670.97
  BONGI MC 69 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  BONGI MC 230 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  BONGI MC 230 kV TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  BONGI TT 69/13,8 kV BONGI TA2 PE DIT   061/2001 IPCA RCDM REA 3578/2012 22/03/2015 21/03/2045 213,437.05
  BONGI TT 69/13,8 kV BONGI TA1 PE DIT   061/2001 IPCA RCDM REA 3578/2012 30/03/2015 29/03/2045 213,552.29
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-3 PE RB FT LT 230 kV BONGI /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-2 PE RB FT LT 230 kV BONGI /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BONGI EL 230 kV BONGI LT 230 kV BONGI /JOAIRAM C-1 PE RB FT LT 230 kV BONGI /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BONGI EL 230 kV BONGI LT 230 kV BONGI /ACONORTE C-1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  BONGI TR 230/13,8 kV BONGI TR7 PE RBF FT TR 230/13,8 kV BONGI TR7 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,729.78
  BONGI TR 230/13,8 kV BONGI TR6 PE RBF FT TR 230/13,8 kV BONGI TR6 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,729.78
  BONGI MC 69 kV BC 69 kV 20,3 Mvar BONGI BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  BONGI EL 69 kV BONGI  VARZEA 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  BONGI EL 69 kV BONGI  VARZEA 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  BONGI EL 69 kV BONGI  RETIRO 02J1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  BONGI EL 69 kV BONGI  IMBIRI 02L2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RBNI REA 3402/2012 14/01/2016 13/01/2044 261,305.54
  BONGI TT 69/13,8 kV BONGI TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  BONGI TT 69/13,8 kV BONGI TA1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  BONGI TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  BONGI TR 230/69 kV BONGI TR3 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  BONGI TR 230/69 kV BONGI TR2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  BONGI TR 230/69 kV BONGI TR1 PE RBF FT TR 230/69 kV BONGI TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  BONGI MC 13,8 kV TR 230/13,8 kV BONGI TR5 PE RBF FT TR 230/13,8 kV BONGI TR5 PE 061/2001 IPCA RBNI REA 3402/2012 14/01/2016 13/01/2047 379,052.61
  BONGI RTS 13,8 kV 5 MVAr BONGI RT2 PE RBF FT TR 230/69 kV BONGI TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 395,132.42
  BONGI RTS 13,8 kV 5 MVAr BONGI RT1 PE RBF FT TR 230/69 kV BONGI TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 395,132.42
  BONGI MG 230 kV BONGI MG1 PE RB FT MG 230 kV BONGI MG1 PE 061/2001 IPCA RMEL REN 643/2014 19/12/2015 18/12/2047 414,903.83
  BONGI MC 230 kV TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  BONGI TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  BONGI TR 230/13,8 kV BONGI TR5 PE RBF FT TR 230/13,8 kV BONGI TR5 PE 061/2001 IPCA RBNI REA 3402/2012 14/01/2016 13/01/2050 1,029,116.52
  BONGI TR 230/69 kV BONGI TR4 PE RBF FT TR 230/69 kV BONGI TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  BONGI MC 230 kV TR 230/13,8 kV BONGI TR5 PE RBF FT TR 230/13,8 kV BONGI TR5 PE 061/2001 IPCA RBNI REA 3402/2012 14/01/2016 13/01/2046 1,131,551.84
  BROT.MACAUBAS IB 230 kV MG 230 kV BROT.MACAUBAS MG1 BA IB1 RB FT MG 230 kV BROT.MACAUBAS MG1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042 142,898.14
  BROT.MACAUBAS EL 230 kV BROT.MACAUBAS LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042 233,230.93
  BROT.MACAUBAS EL 230 kV BROT.MACAUBAS LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042 233,230.93
  BROT.MACAUBAS MG 230 kV BROT.MACAUBAS MG1 BA RB FT MG 230 kV BROT.MACAUBAS MG1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042 410,244.96
  BRUMADO II EL 230 kV BRUMADO II LT 230 kV BRUMADO II /IBICOARA C-1 BA RB FT LT 230 kV BRUMADO II /IBICOARA C-1 BA 010/2007 IPCA RMEL REN 443/2011 26/10/2016 25/10/2044 3,210.64
  BRUMADO II EL 230 kV BRUMADO II LT 230 kV BRUMADO II /IBICOARA C-1 BA RB FT LT 230 kV BRUMADO II /IBICOARA C-1 BA 010/2007 IPCA RBL CC 010/2007 11/6/2007 11/6/2037 462,436.30
  C.GRANDE II MC 69 kV TR 69/13,8 kV C.GRANDE II TR7A PB TR7B/TR7C DIT   061/2001 IPCA RMEL REN 643/2014 8/10/2015 7/10/2029 411.55
  C.GRANDE II EL 69 kV C.GRANDE II LT 69 kV C.GRANDE II /C.GRANDE I C-1 PB DIT   061/2001 IPCA RMEL REN 643/2014 8/10/2015 7/10/2029 411.55
  C.GRANDE II MC 69 kV TR 69/13,8 kV C.GRANDE II TR7A PB TR7B/TR7C DIT   061/2001 IPCA RMEL REN 643/2014 9/10/2015 8/10/2029 411.62
  C.GRANDE II EL 69 kV C.GRANDE II LT 69 kV C.GRANDE II /C.GRANDE I C-1 PB DIT   061/2001 IPCA RMEL REN 643/2014 9/10/2015 8/10/2029 411.62
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBNI REA 3208/2011 9/12/2019 9/12/2048 650.07
  C.GRANDE II EL 69 kV C.GRANDE II  ESPERANCA DIT   061/2001 IPCA RMEL REN 643/2014 10/10/2015 9/10/2029 823.35
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 7/2/2014 6/2/2046 6,252.61
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RMEL REN 443/2011 18/05/2016 17/05/2046 12,128.62
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RMEL REN 443/2011 18/05/2016 17/05/2046 12,128.62
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RMEL REN 443/2011 18/05/2016 17/05/2046 12,128.62
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2046 13,849.64
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RMEL REN 443/2011 14/02/2016 13/02/2046 13,865.50
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RMEL REN 443/2011 14/02/2016 13/02/2046 13,865.50

 

56 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  C.GRANDE II MC 69 kV BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RCDM REA 7761/2019 29/04/2019 28/04/2055 16,054.96
  C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE2 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RMEL REN 443/2011 16/03/2017 15/03/2050 19,407.75
  C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE1 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RMEL REN 443/2011 16/03/2017 15/03/2050 19,407.75
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RMEL REN 443/2011 12/7/2017 11/7/2047 20,516.59
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 16/08/2013 15/08/2030 25,785.75
  C.GRANDE II MC 69 kV TT 69/13,8 kV C.GRANDE II TA1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035 29,954.38
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 26/12/2015 25/12/2032 31,238.40
  C.GRANDE II EL 69 kV C.GRANDE II  EMBRATEX DIT   061/2001 IPCA RMEL REN 443/2011 31/03/2017 30/03/2048 31,487.60
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 443/2011 23/09/2016 22/09/2033 32,290.59
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 443/2011 1/2/2016 31/01/2033 32,563.19
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 21/07/2014 20/07/2044 36,570.84
  C.GRANDE II IB 69 kV MG 230 kV C.GRANDE II MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBNI REN 905/2020 11/12/2014 10/12/2045 44,674.43
  C.GRANDE II MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 16T1 RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  C.GRANDE II MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 11T1 RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBNIA REA 8328/2019     48,433.99
  C.GRANDE II MC 13,8 kV CS 20/-10 MVAr C.GRANDE II CS1 PB RBF FT CS 20/-10 MVAr C.GRANDE II CS1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,856.97
  C.GRANDE II MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 16T1 RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 64,170.73
  C.GRANDE II MC 13,8 kV RTB 13,8 kV 5 MVAr C.GRANDE II RT2 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  C.GRANDE II MC 13,8 kV RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  C.GRANDE II MC 69 kV TR 230/69 kV C.GRANDE II TR5 PB RBF FT TR 230/69 kV C.GRANDE II TR5 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  C.GRANDE II MC 69 kV TR 230/69 kV C.GRANDE II TR4 PB RBF FT TR 230/69 kV C.GRANDE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  C.GRANDE II MC 69 kV TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  C.GRANDE II MC 69 kV BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  C.GRANDE II MC 69 kV BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  C.GRANDE II EL 69 kV C.GRANDE II LT 69 kV C.GRANDE II /C.GRANDE I C-1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  C.GRANDE II EL 69 kV C.GRANDE II LT 69 kV C.GRANDE II /BELA VISTA C-1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  C.GRANDE II EL 69 kV C.GRANDE II  QUEIMADAS DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  C.GRANDE II EL 69 kV C.GRANDE II  JUAZEIRINHO DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  C.GRANDE II EL 69 kV C.GRANDE II  ESPERANCA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  C.GRANDE II EL 69 kV C.GRANDE II  EMBRATEX DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  C.GRANDE II EL 69 kV C.GRANDE II  BOQUEIRAO DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  C.GRANDE II EL 69 kV C.GRANDE II  BOA VISTA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 27/12/2015 26/12/2029 78,306.24
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RCDM REA 4809/2014 17/02/2017 16/02/2047 87,651.95
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RCDM REA 4809/2014 17/02/2017 16/02/2047 87,651.95
  C.GRANDE II MC 13,8 kV RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 89,933.61
  C.GRANDE II IB 138 kV MG 230 kV C.GRANDE II MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,365.85
  C.GRANDE II TT 69/13,8 kV C.GRANDE II TA2 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  C.GRANDE II TT 69/13,8 kV C.GRANDE II TA1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  C.GRANDE II BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RMEL REN 643/2014 11/12/2013 10/12/2033 97,483.37
  C.GRANDE II MC 69 kV BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  C.GRANDE II MC 69 kV BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  C.GRANDE II EL 69 kV C.GRANDE II LT 69 kV C.GRANDE II /BELA VISTA C-1 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  C.GRANDE II EL 69 kV C.GRANDE II  JUAZEIRINHO DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  C.GRANDE II EL 69 kV C.GRANDE II  ESPERANCA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBNI REA 7761/2019 29/04/2019 28/04/2049 105,813.40
  C.GRANDE II BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,338.74
  C.GRANDE II BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 115,654.60
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR4 PB RBF FT TR 230/69 kV C.GRANDE II TR4 PB 061/2001 IPCA RMEL REN 443/2011 13/08/2017 12/8/2049 119,578.70
  C.GRANDE II MC 230 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RMEL REN 443/2011 1/11/2017 31/10/2049 120,225.80
  C.GRANDE II MC 230 kV BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RMEL REN 443/2011 22/11/2017 21/11/2049 120,395.67
  C.GRANDE II IB 230 kV MG 230 kV C.GRANDE II MG1 PB IB1 RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  C.GRANDE II IB 138 kV MG 230 kV C.GRANDE II MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 124,739.62
  C.GRANDE II TT 69/13,8 kV C.GRANDE II TA1 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  C.GRANDE II RTB 13,8 kV 5 MVAr C.GRANDE II RT2 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  C.GRANDE II RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  C.GRANDE II IB 230 kV MG 230 kV C.GRANDE II MG1 PB IB3 RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  C.GRANDE II IB 230 kV MG 230 kV C.GRANDE II MG1 PB IB2 RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  C.GRANDE II MC 13,8 kV TR 230/138 kV C.GRANDE II TR1 PB 16T1 RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 140,763.15
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN 061/2001 IPCA RBNI REA 3578/2012 21/11/2020 20/11/2053 144,771.67
  C.GRANDE II MC 230 kV RTB 230 kV 30 MVAr C.GRANDE II RT2 PB RB FT RTB 230 kV 30 MVAr C.GRANDE II RT2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,194.51
  C.GRANDE II MC 230 kV RTB 230 kV 10 Mvar C.GRANDE II RT1 PB RB FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,194.51
  C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR5 PB RBF FT TR 230/69 kV C.GRANDE II TR5 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR4 PB RBF FT TR 230/69 kV C.GRANDE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  C.GRANDE II MC 230 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  C.GRANDE II MC 230 kV TR 230/138 kV C.GRANDE II TR1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  C.GRANDE II BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 155,070.65
  C.GRANDE II MC 230 kV CE 100/-0 Mvar C.GRANDE II CE1 PB CE2 RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 157,363.60
  C.GRANDE II BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 159,647.81
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 161,455.34
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 161,455.34
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBNIA REA 8328/2019     172,877.72
  C.GRANDE II MC 230 kV BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 173,549.34
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBNI REA 2040/2009 5/1/2016 4/1/2047 186,493.46
  C.GRANDE II MC 13,8 kV RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB RBF FT RTB 13,8 kV 5 MVAr C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,275.92

 

57 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  C.GRANDE II BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,444.63
  C.GRANDE II RTB 230 kV 10 Mvar C.GRANDE II RT1 PB RB FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,855.62
  C.GRANDE II MC 230 kV RTB 230 kV 10 Mvar C.GRANDE II RT1 PB RB FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 201,804.63
  C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE II /COTEMINAS C-1 PB RB FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  C.GRANDE II MC 69 kV BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  C.GRANDE II MC 69 kV BC 69 kV 20,3 Mvar C.GRANDE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  C.GRANDE II EL 69 kV C.GRANDE II  JUAZEIRINHO DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  C.GRANDE II EL 69 kV C.GRANDE II  ESPERANCA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  C.GRANDE II MC 230 kV BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 239,564.81
  C.GRANDE II RTB 230 kV 30 MVAr C.GRANDE II RT2 PB RB FT RTB 230 kV 30 MVAr C.GRANDE II RT2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 240,015.58
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 240,745.16
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 240,745.16
  C.GRANDE II IB 138 kV MG 230 kV C.GRANDE II MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 273,625.41
  C.GRANDE II BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,310.27
  C.GRANDE II TT 69/13,8 kV C.GRANDE II TA1 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 284,637.92
  C.GRANDE II TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,678.64
  C.GRANDE II TR 230/138 kV C.GRANDE II TR1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,678.64
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  C.GRANDE II BC 69 kV 21,2 Mvar C.GRANDE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 350,199.07
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 354,164.03
  C.GRANDE II MC 138 kV TR 230/138 kV C.GRANDE II TR1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 354,164.03
  C.GRANDE II TR 230/69 kV C.GRANDE II TR5 PB RBF FT TR 230/69 kV C.GRANDE II TR5 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  C.GRANDE II TR 230/69 kV C.GRANDE II TR4 PB RBF FT TR 230/69 kV C.GRANDE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  C.GRANDE II TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  C.GRANDE II MC 69 kV TR 230/69 kV C.GRANDE II TR6 PB RBF FT TR 230/69 kV C.GRANDE II TR6 PB 061/2001 IPCA RBNIA REA 8328/2019     369,430.18
  C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT2 PB RBF FT TR 230/138 kV C.GRANDE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 395,132.42
  C.GRANDE II RTS 13,8 kV 5 Mvar C.GRANDE II RT1 PB RBF FT TR 230/138 kV C.GRANDE II TR1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 395,132.42
  C.GRANDE II MC 230 kV RTB 230 kV 10 Mvar C.GRANDE II RT1 PB RB FT RTB 230 kV 10 Mvar C.GRANDE II RT1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 442,673.12
  C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  C.GRANDE II TR 230/69 kV C.GRANDE II TR5 PB RBF FT TR 230/69 kV C.GRANDE II TR5 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  C.GRANDE II TR 230/69 kV C.GRANDE II TR3 PB RBF FT TR 230/69 kV C.GRANDE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  C.GRANDE II MC 230 kV BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 525,502.83
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 528,092.00
  C.GRANDE II EL 138 kV C.GRANDE II LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 528,092.00
  C.GRANDE II EL 69 kV C.GRANDE II  AEROCLUBE DIT   061/2001 IPCA RCDM REN 905/2020 11/12/2014 10/12/2042 529,899.23
  C.GRANDE II BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB RB FT BC 230 kV 50,5 MVAr C.GRANDE II BC1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 603,913.08
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  C.GRANDE II EL 230 kV C.GRANDE II LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  C.GRANDE II CS 20/-10 MVAr C.GRANDE II CS1 PB RBF FT CS 20/-10 MVAr C.GRANDE II CS1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 798,670.52
  C.GRANDE II MC 230 kV TR 230/69 kV C.GRANDE II TR6 PB RBF FT TR 230/69 kV C.GRANDE II TR6 PB 061/2001 IPCA RBNIA REA 8328/2019     858,731.61
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 989,248.70
  C.GRANDE II TR 230/69 kV C.GRANDE II TR5 PB RBF FT TR 230/69 kV C.GRANDE II TR5 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  C.GRANDE II TR 230/69 kV C.GRANDE II TR6 PB RBF FT TR 230/69 kV C.GRANDE II TR6 PB 061/2001 IPCA RBNIA REA 8328/2019     1,278,923.49
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,365,543.51
  C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE2 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,359,502.33
  C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE1 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,359,502.33
  C.GRANDE II MG 230 kV C.GRANDE II MG1 PB RB FT MG 230 kV C.GRANDE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,995,418.95
  C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE2 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,257,020.31
  C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE1 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,257,020.31
  C.GRANDE II CE 100/-0 Mvar C.GRANDE II CE2 PB RB FT CE 100/-0 Mvar C.GRANDE II CE1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,144,510.80
  C.GRANDE III EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2045 147,475.09
  C.GRANDE III EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2045 147,475.09
  C.GRANDE III EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2045 147,475.09
  C.GRANDE III IB 230 kV MG 500 kV C.GRANDE III MG1 PB IB1 RB FT MG 500 kV C.GRANDE III MG1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 153,638.04
  C.GRANDE III MC 230 kV TR 500/230 kV C.GRANDE III TR1 PB RB FT TR 500/230 kV C.GRANDE III TR1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 202,749.51
  C.GRANDE III EL 230 kV C.GRANDE III LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 284,637.92
  C.GRANDE III RTL 500 kV 33,33 Mvar C.GRANDE III RTR2 PB RB FT RTL 500 kV 33,33 Mvar C.GRANDE III RTR2 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 301,591.82
  C.GRANDE III MG 500 kV C.GRANDE III MG1 PB RB FT MG 500 kV C.GRANDE III MG1 PB 008/2011 IPCA RBNI REA 3738/2012 13/05/2015 12/5/2046 315,039.52
  C.GRANDE III MC 500 kV RTL 500 kV 100 Mvar C.GRANDE III RTL2 PB RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 330,266.89
  C.GRANDE III RTB 500 kV 50 Mvar C.GRANDE III RTR1 PB RB FT RTB 500 kV 50 Mvar C.GRANDE III RTR1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 345,926.10
  C.GRANDE III MC 230 kV TR 500/230 kV C.GRANDE III TR2 PB RB FT TR 500/230 kV C.GRANDE III TR2 PB 008/2011 IPCA RBNI REA 3738/2012 13/05/2015 12/5/2039 477,912.11
  C.GRANDE III MC 500 kV RTB 500 kV 150 Mvar C.GRANDE III RT1 PB RB FT RTB 500 kV 150 Mvar C.GRANDE III RT1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 515,512.06
  C.GRANDE III MC 500 kV TR 500/230 kV C.GRANDE III TR1 PB RB FT TR 500/230 kV C.GRANDE III TR1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 551,635.62
  C.GRANDE III IB 500 kV MG 500 kV C.GRANDE III MG1 PB IB2 RB FT MG 500 kV C.GRANDE III MG1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 590,048.88
  C.GRANDE III IB 500 kV MG 500 kV C.GRANDE III MG1 PB IB1 RB FT MG 500 kV C.GRANDE III MG1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 590,048.88
  C.GRANDE III EL 500 kV C.GRANDE III LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 618,609.07
  C.GRANDE III TR 500/230 kV C.GRANDE III TRR1 PB RB FT TR 500/230 kV C.GRANDE III TRR1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 832,575.27
  C.GRANDE III RTL 500 kV 100 Mvar C.GRANDE III RTL2 PB RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 904,776.45
  C.GRANDE III RTB 500 kV 150 Mvar C.GRANDE III RT1 PB RB FT RTB 500 kV 150 Mvar C.GRANDE III RT1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 1,037,778.30
  C.GRANDE III MG 500 kV C.GRANDE III MG1 PB RB FT MG 500 kV C.GRANDE III MG1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 1,059,647.24
  C.GRANDE III MC 500 kV TR 500/230 kV C.GRANDE III TR2 PB RB FT TR 500/230 kV C.GRANDE III TR2 PB 008/2011 IPCA RBNI REA 3738/2012 13/05/2015 12/5/2043 1,214,817.97

 

58 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  C.GRANDE III TR 500/230 kV C.GRANDE III TR1 PB RB FT TR 500/230 kV C.GRANDE III TR1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 2,497,726.80
  C.GRANDE III TR 500/230 kV C.GRANDE III TR2 PB RB FT TR 500/230 kV C.GRANDE III TR2 PB 008/2011 IPCA RBNI REA 3738/2012 13/05/2015 12/5/2050 5,190,120.02
  CAMACARI II EL 69 kV CAMACARI II  STA HELENA-02F1 DIT   061/2001 IPCA RMEL REN 443/2011 16/01/2016 15/01/2046 1,278.40
  CAMACARI II EL 69 kV CAMACARI II  CTG CTU-02J6 DIT   061/2001 IPCA RMEL REN 443/2011 16/01/2016 15/01/2046 1,278.40
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV OLINDINA /CAMACARI II C-1 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-1 BA 061/2001 IPCA RMEL REN 443/2011 26/01/2017 25/01/2047 3,367.87
  CAMACARI II CS 150/-105 MVAr CAMACARI II CS1 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RMEL REN 443/2011 17/12/2016 16/12/2041 15,040.38
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RMEL REN 443/2011 23/05/2015 22/05/2045 17,368.11
  CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RMEL REN 443/2011 12/9/2015 11/9/2045 17,519.50
  CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RMEL REN 443/2011 12/9/2015 11/9/2045 17,519.50
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RMEL REN 443/2011 11/10/2015 10/10/2045 17,558.67
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RMEL REN 443/2011 11/10/2015 10/10/2045 17,558.67
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 13/11/2015 12/11/2045 17,603.27
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 13/11/2015 12/11/2045 17,603.27
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 13/11/2015 12/11/2045 17,603.27
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 13/11/2015 12/11/2045 17,603.27
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 17/11/2015 16/11/2045 17,608.68
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 17/11/2015 16/11/2045 17,608.68
  CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 643/2014 9/2/2014 8/2/2044 20,553.25
  CAMACARI II TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RMEL REN 643/2014 22/09/2013 21/09/2047 25,258.94
  CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 25,397.05
  CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBNI REA 7761/2019 31/12/2019 30/12/2034 26,397.44
  CAMACARI II MC 69 kV TT 69/13,8 kV CAMACARI II TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  CAMACARI II MC 69 kV TT 69/13,8 kV CAMACARI II TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  CAMACARI II TR 69/13,8 kV CAMACARI II TR8 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  CAMACARI II TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RMEL REN 643/2014 22/09/2013 21/09/2047 30,370.76
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 10/11/2013 9/11/2041 38,252.05
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RMEL REN 643/2014 18/05/2014 17/05/2042 38,879.72
  CAMACARI II TR 69/13,8 kV CAMACARI II TR8 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBNI REA 7761/2019 10/6/2019 9/6/2034 40,025.00
  CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 643/2014 9/2/2014 8/2/2044 41,106.48
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBNI REA 2376/2010 25/07/2014 24/07/2044 41,536.37
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 2376/2010 25/07/2014 24/07/2044 41,536.37
  CAMACARI II IB 69 kV MG 500 kV CAMACARI II MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  CAMACARI II MC 13,8 kV TR 69/13,8 kV CAMACARI II TR8 BA MC2 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  CAMACARI II MC 13,8 kV TR 69/13,8 kV CAMACARI II TR8 BA MC1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  CAMACARI II MC 13,8 kV TR 13,8/0,46 kV CAMACARI II TR2 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  CAMACARI II MC 13,8 kV TR 13,8/0,46 kV CAMACARI II TR1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RMEL REN 643/2014 2/2/2014 1/2/2042 54,885.96
  CAMACARI II MC 69 kV TR 69/13,8 kV CAMACARI II TR8 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 443/2011 21/02/2016 20/02/2033 61,585.16
  CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB2 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/01/2014 29/01/2044 61,610.70
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RMEL REN 643/2014 22/02/2014 21/02/2044 61,723.45
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044 61,728.34
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RMEL REN 643/2014 7/6/2014 6/6/2044 62,238.16
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RMEL REN 643/2014 8/6/2014 7/6/2044 62,243.07
  CAMACARI II MC 13,8 kV CS 150/-105 MVAr CAMACARI II CS2 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,856.97
  CAMACARI II MC 13,8 kV CS 150/-105 MVAr CAMACARI II CS1 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,856.97
  CAMACARI II MC 69 kV TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  CAMACARI II MC 69 kV TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 1/5/2014 30/04/2044 68,783.16
  CAMACARI II MC 230 kV TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBNI REA 2040/2009 20/02/2022 19/02/2055 71,631.25
  CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB2 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBNI REA 2040/2009 20/02/2022 19/02/2055 71,631.25
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /US.CAMACARI C-1 BA DIT   061/2001 IPCA RCDM REA 2040/2009 20/02/2022 19/02/2055 71,631.25
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /PITUACU C-1 BA RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2040/2009 20/02/2022 19/02/2055 71,631.25
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBNI REA 2040/2009 20/02/2022 19/02/2055 71,631.25
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 2040/2009 20/02/2022 19/02/2055 71,631.25
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RCDM REA 2040/2009 20/02/2022 19/02/2055 71,631.25
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-2 BA DIT   061/2001 IPCA RCDM REA 2040/2009 20/02/2022 19/02/2055 71,631.25
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA DIT   061/2001 IPCA RCDM REA 2040/2009 20/02/2022 19/02/2055 71,631.25
  CAMACARI II EL 69 kV CAMACARI II  STA HELENA-02F2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CAMACARI II EL 69 kV CAMACARI II  STA HELENA-02F1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CAMACARI II EL 69 kV CAMACARI II  CTG CTU-02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CAMACARI II TR 69/13,8 kV CAMACARI II TR8 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2041 91,818.20
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /PITUACU C-1 BA RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBNI REA 6137/2016 26/06/2020 26/06/2047 92,037.34
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 6137/2016 26/08/2020 26/08/2047 92,037.34
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 6137/2016 17/08/2020 17/08/2047 92,037.34
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RCDM REA 6137/2016 28/07/2020 28/07/2047 92,037.34
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-2 BA DIT   061/2001 IPCA RCDM REA 6137/2016 7/8/2020 7/8/2047 92,037.34
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RCDM REA 6137/2016 30/06/2020 30/06/2047 92,037.34
  CAMACARI II TT 69/13,8 kV CAMACARI II TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  CAMACARI II EL 69 kV CAMACARI II  CTG CTU-02J6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI REA 6845/2018 15/09/2019 14/09/2052 107,143.53
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBNI REA 6137/2016 3/1/2021 3/1/2047 120,333.34
  CAMACARI II MC 230 kV TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBNI REA 6137/2016 29/06/2020 29/06/2046 120,333.34
  CAMACARI II MC 230 kV TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBNI REA 6137/2016 20/01/2021 20/01/2047 120,333.34
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI REA 7761/2019 31/12/2019 30/12/2034 122,427.59
  CAMACARI II TT 69/13,8 kV CAMACARI II TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB2 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  CAMACARI II IB 230 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 6258/2017 27/11/2020 27/11/2050 143,156.85
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  CAMACARI II MC 230 kV TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  CAMACARI II MC 230 kV TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  CAMACARI II MC 230 kV TR 230/13,8 kV CAMACARI II TR7 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,618.63

 

59 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,618.63
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,618.63
  CAMACARI II TT 69/13,8 kV CAMACARI II TA1 BA DIT   061/2001 IPCA RCDM REA 3578/2012 8/8/2015 7/8/2045 215,439.43
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RBNI REA 6137/2016 20/12/2020 20/12/2051 228,059.17
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBNI REA 6137/2016 20/12/2020 20/12/2051 228,059.17
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  CAMACARI II MC 230 kV TR 230/13,8 kV CAMACARI II TR7 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  CAMACARI II RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA RB FT RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 233,867.79
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /US.CAMACARI C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /PITUACU C-1 BA RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II  VAGO8 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II  VAGO7 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II  VAGO6 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II  VAGO5 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II  VAGO4 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II  VAGO3 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II  VAGO2 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II EL 230 kV CAMACARI II  VAGO1 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  CAMACARI II TR 230/13,8 kV CAMACARI II TRR1 BA RB FT TR 230/13,8 kV CAMACARI II TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 246,763.97
  CAMACARI II TT 69/13,8 kV CAMACARI II TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  CAMACARI II RTL 500 kV 60 Mvar CAMACARI II RTR2 BA RB FT RTL 500 kV 60 Mvar CAMACARI II RTR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,025.77
  CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RMEL REN 643/2014 7/2/2014 6/2/2028 311,344.00
  CAMACARI II RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA RB FT RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,827.46
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  CAMACARI II EL 230 kV CAMACARI II  VAGO6 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  CAMACARI II TR 230/13,8 kV CAMACARI II TRR1 BA RB FT TR 230/13,8 kV CAMACARI II TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 340,629.15
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBNI REA 6137/2016 20/01/2021 20/01/2051 349,356.29
  CAMACARI II TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  CAMACARI II TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  CAMACARI II MC 500 kV RTL 500 kV 100 Mvar CAMACARI II RT1 BA RB FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 369,535.41
  CAMACARI II RTL 500 kV 60 Mvar CAMACARI II RTR2 BA RB FT RTL 500 kV 60 Mvar CAMACARI II RTR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 392,064.76
  CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  CAMACARI II MC 500 kV TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB3 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB2 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV OLINDINA /CAMACARI II C-2 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV OLINDINA /CAMACARI II C-1 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  CAMACARI II TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  CAMACARI II TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  CAMACARI II MC 230 kV TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB3 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB1 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  CAMACARI II TR 500/230 kV CAMACARI II TRR1 BA RB FT TR 500/230 kV CAMACARI II TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 647,846.29
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  CAMACARI II RTL 500 kV 100 Mvar CAMACARI II RT1 BA RB FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 701,859.07
  CAMACARI II RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA RB FT RTL 500 kV 33,3 Mvar CAMACARI II RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 708,145.50
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  CAMACARI II EL 230 kV CAMACARI II LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  CAMACARI II EL 230 kV CAMACARI II  VAGO6 RB FT EL 230 kV CAMACARI II  VAGO1 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  CAMACARI II TR 230/13,8 kV CAMACARI II TR7 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 740,291.92
  CAMACARI II TR 230/13,8 kV CAMACARI II TRR1 BA RB FT TR 230/13,8 kV CAMACARI II TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 747,194.80
  CAMACARI II RTL 500 kV 60 Mvar CAMACARI II RTR2 BA RB FT RTL 500 kV 60 Mvar CAMACARI II RTR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 860,022.55
  CAMACARI II TR 500/230 kV CAMACARI II TRR1 BA RB FT TR 500/230 kV CAMACARI II TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 894,276.94
  CAMACARI II RTL 500 kV 100 Mvar CAMACARI II RT1 BA RB FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 968,835.33
  CAMACARI II TR 230/13,8 kV CAMACARI II TR7 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,021,887.45
  CAMACARI II TR 230/69 kV CAMACARI II TR6 BA RBF FT TR 230/69 kV CAMACARI II TR6 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  CAMACARI II TR 230/69 kV CAMACARI II TR5 BA RBF FT TR 230/69 kV CAMACARI II TR5 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB4 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  CAMACARI II IB 500 kV MG 500 kV CAMACARI II MG1 BA IB3 RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  CAMACARI II EL 500 kV CAMACARI II LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,480,048.26
  CAMACARI II CS 150/-105 MVAr CAMACARI II CS2 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,683,466.69
  CAMACARI II CS 150/-105 MVAr CAMACARI II CS1 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,683,466.69
  CAMACARI II TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  CAMACARI II TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  CAMACARI II TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  CAMACARI II TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  CAMACARI II RTL 500 kV 100 Mvar CAMACARI II RT1 BA RB FT RTL 500 kV 100 Mvar CAMACARI II RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,125,210.73
  CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,237,838.09
  CAMACARI II TR 230/13,8 kV CAMACARI II TR7 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,241,584.39
  CAMACARI II CS 150/-105 MVAr CAMACARI II CS2 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,323,831.22
  CAMACARI II CS 150/-105 MVAr CAMACARI II CS1 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,323,831.22

 

60 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  CAMACARI II TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,682,830.82
  CAMACARI II TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,682,830.82
  CAMACARI II TR 500/230 kV CAMACARI II TR2 BA RB FT TR 500/230 kV CAMACARI II TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,682,830.82
  CAMACARI II TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,682,830.82
  CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,089,076.88
  CAMACARI II CS 150/-105 MVAr CAMACARI II CS2 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,097,492.70
  CAMACARI II CS 150/-105 MVAr CAMACARI II CS1 BA RB FT CS 150/-105 MVAr CAMACARI II CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,097,492.70
  CAMACARI II TR 500/230 kV CAMACARI II TR4 BA RB FT TR 500/230 kV CAMACARI II TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,884,984.41
  CAMACARI II TR 500/230 kV CAMACARI II TR3 BA RB FT TR 500/230 kV CAMACARI II TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,884,984.41
  CAMACARI II TR 500/230 kV CAMACARI II TR1 BA RB FT TR 500/230 kV CAMACARI II TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,884,984.41
  CAMACARI II MG 500 kV CAMACARI II MG1 BA RB FT MG 500 kV CAMACARI II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,776,114.69
  CAMACARI IV MC 500 kV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RMEL REN 643/2014 20/03/2014 19/03/2044 73,022.45
  CAMACARI IV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBNI REA 2376/2010 24/03/2014 23/03/2045 103,787.50
  CAMACARI IV EL 500 kV CAMACARI IV LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBNI REA 10135/2021 15/08/2016 15/08/2044 184,015.06
  CAMACARI IV EL 500 kV CAMACARI IV LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBNI REA 10135/2021 15/08/2016 15/08/2044 184,015.06
  CAMACARI IV IB 230 kV MG 500 kV CAMACARI IV MG1 BA IB1 RB FT MG 500 kV CAMACARI IV MG1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/7/2040 301,065.68
  CAMACARI IV MC 500 kV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 369,535.41
  CAMACARI IV MC 230 kV TR 500/230 kV CAMACARI IV TR2 BA RB FT TR 500/230 kV CAMACARI IV TR2 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/7/2040 410,008.60
  CAMACARI IV MC 230 kV TR 500/230 kV CAMACARI IV TR1 BA RB FT TR 500/230 kV CAMACARI IV TR1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/7/2040 410,008.60
  CAMACARI IV MC 500 kV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 510,100.93
  CAMACARI IV IB 500 kV MG 500 kV CAMACARI IV MG1 BA IB2 RB FT MG 500 kV CAMACARI IV MG1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/7/2040 788,717.71
  CAMACARI IV IB 500 kV MG 500 kV CAMACARI IV MG1 BA IB1 RB FT MG 500 kV CAMACARI IV MG1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/7/2040 788,717.71
  CAMACARI IV MC 500 kV TR 500/230 kV CAMACARI IV TR2 BA RB FT TR 500/230 kV CAMACARI IV TR2 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/7/2040 792,469.04
  CAMACARI IV MC 500 kV TR 500/230 kV CAMACARI IV TR1 BA RB FT TR 500/230 kV CAMACARI IV TR1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/7/2040 792,469.04
  CAMACARI IV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 802,051.67
  CAMACARI IV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,107,139.65
  CAMACARI IV MC 500 kV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,118,943.46
  CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2891/2011 5/5/2014 4/5/2044 1,259,984.60
  CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 2891/2011 2/6/2014 1/6/2044 1,262,383.14
  CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 11/8/2014 10/8/2044 1,268,379.51
  CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CAMACARI IV /JACARACANGA C-1 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 1/9/2014 31/08/2044 1,270,178.44
  CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBNI REA 2891/2011 13/10/2014 12/10/2044 1,273,776.25
  CAMACARI IV EL 230 kV CAMACARI IV LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBNI REA 2891/2011 5/11/2014 4/11/2044 1,275,746.48
  CAMACARI IV TR 500/230 kV CAMACARI IV TRR1 BA RB FT TR 500/230 kV CAMACARI IV TRR1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/7/2040 1,309,028.12
  CAMACARI IV MG 500 kV CAMACARI IV MG1 BA RB FT MG 500 kV CAMACARI IV MG1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/7/2040 1,448,072.26
  CAMACARI IV RTL 500 kV 148 Mvar CAMACARI IV RT1 BA RB FT RTL 500 kV 148 Mvar CAMACARI IV RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,428,591.30
  CAMACARI IV TR 500/230 kV CAMACARI IV TR2 BA RB FT TR 500/230 kV CAMACARI IV TR2 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/7/2040 3,927,086.42
  CAMACARI IV TR 500/230 kV CAMACARI IV TR1 BA RB FT TR 500/230 kV CAMACARI IV TR1 BA 007/2010 IPCA RBL CC 007/2010 19/12/2012 12/7/2040 3,927,086.42
  CAMPO FORMOSO MG 230 kV CAMPO FORMOSO MG1 BA RB FT MG 230 kV CAMPO FORMOSO MG1 BA 061/2001 IPCA RBNI DSP 1172/2022 1/7/2022 30/06/2040 56,185.17
  CAMPO FORMOSO MG 230 kV CAMPO FORMOSO MG1 BA RB FT MG 230 kV CAMPO FORMOSO MG1 BA 061/2001 IPCA RBNI DSP 1172/2022 1/7/2022 30/06/2053 58,098.43
  CAMPO FORMOSO IB 230 kV MG 230 kV CAMPO FORMOSO MG1 BA RB FT MG 230 kV CAMPO FORMOSO MG1 BA 061/2001 IPCA RBNI DSP 1172/2022 1/7/2022 30/06/2052 140,797.80
  CAMPO FORMOSO EL 230 kV CAMPO FORMOSO LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA RB FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA 061/2001 IPCA RBNI DSP 1172/2022 1/7/2022 30/06/2051 196,013.94
  CAMPO FORMOSO EL 230 kV CAMPO FORMOSO LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA RB FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBNI DSP 1172/2022 1/7/2022 30/06/2051 196,013.94
  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RMEL REN 443/2011 4/10/2017 3/10/2047 3,274.20
  CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RMEL REN 443/2011 15/04/2016 14/04/2044 3,614.87
  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RMEL REN 443/2011 1/10/2017 30/09/2047 6,950.88
  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RMEL REN 443/2011 14/06/2017 13/06/2047 6,965.54
  CATU EL 230 kV CATU LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RMEL REN 443/2011 21/09/2017 20/09/2047 6,974.99
  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RMEL REN 443/2011 29/09/2017 28/09/2047 6,979.06
  CATU EL 13,8 kV CATU  POJUCA 01Y5 DIT   061/2001 IPCA RCDM REA 5484/2015 21/11/2016 20/11/2049 26,799.51
  CATU EL 13,8 kV CATU  POJUCA 01Y4 DIT   061/2001 IPCA RCDM REA 5484/2015 21/11/2016 20/11/2049 26,799.51
  CATU EL 13,8 kV CATU  CID. CATU DIT   061/2001 IPCA RCDM REA 5484/2015 21/11/2016 20/11/2049 26,799.51
  CATU EL 13,8 kV CATU  CATU 01Y1 DIT   061/2001 IPCA RCDM REA 5484/2015 21/11/2016 20/11/2049 26,799.51
  CATU EL 13,8 kV CATU  CATU 01Y1 DIT   061/2001 IPCA RCDM REA 5484/2015 22/11/2016 21/11/2048 26,950.70
  CATU MC 69 kV TT 69/13,8 kV CATU TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  CATU MC 69 kV TT 69/0 kV CATU TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  CATU IB 13,8 kV MG 230 kV CATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,948.27
  CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 32,197.76
  CATU EL 13,8 kV CATU  POJUCA 01Y5 DIT   061/2001 IPCA RCDM REA 5484/2015 22/11/2016 21/11/2048 34,811.56
  CATU EL 13,8 kV CATU  POJUCA 01Y4 DIT   061/2001 IPCA RCDM REA 5484/2015 22/11/2016 21/11/2048 38,556.97
  CATU EL 13,8 kV CATU  CID. CATU DIT   061/2001 IPCA RCDM REA 5484/2015 22/11/2016 21/11/2047 42,302.34
  CATU IB 69 kV MG 230 kV CATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBNI REN 905/2020 28/05/2021 27/05/2052 47,572.88
  CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBNI REN 905/2020 28/05/2021 27/05/2052 47,572.88
  CATU MC 13,8 kV TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,453.67
  CATU MC 13,8 kV TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,453.67
  CATU EL 13,8 kV CATU  POJUCA 01Y5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  CATU EL 13,8 kV CATU  POJUCA 01Y4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  CATU EL 13,8 kV CATU  CID. CATU DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  CATU EL 13,8 kV CATU  CATU 01Y1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  CATU MC 69 kV TR 230/69 kV CATU TR3 BA RBF FT TR 230/69 kV CATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  CATU MC 69 kV TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  CATU MC 69 kV TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  CATU EL 13,8 kV CATU  POJUCA 01Y5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  CATU EL 13,8 kV CATU  POJUCA 01Y4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  CATU EL 13,8 kV CATU  CID. CATU DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  CATU EL 13,8 kV CATU  CATU 01Y1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  CATU EL 69 kV CATU LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CATU EL 69 kV CATU LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CATU EL 69 kV CATU  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CATU EL 69 kV CATU  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CATU EL 69 kV CATU  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CATU EL 69 kV CATU  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CATU EL 69 kV CATU  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CATU EL 69 kV CATU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBNI REA 2891/2011 13/10/2014 12/10/2040 88,576.60

 

 

61 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBNI REA 2891/2011 5/11/2014 4/11/2040 88,757.13
  CATU EL 230 kV CATU LT 230 kV CATU /G.MANGABEIRA C-1 BA RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2041 91,818.20
  CATU TT 69/13,8 kV CATU TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  CATU TT 69/0 kV CATU TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  CATU RTS 13,8 kV 5 Mvar CATU RT2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  CATU RTS 13,8 kV 5 MVAr CATU RT1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  CATU IB 230 kV MG 230 kV CATU MG1 BA IB2 RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  CATU IB 230 kV MG 230 kV CATU MG1 BA IB1 RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  CATU MC 230 kV TR 230/69 kV CATU TR3 BA RBF FT TR 230/69 kV CATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  CATU MC 230 kV TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  CATU MC 230 kV TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  CATU EL 13,8 kV CATU  POJUCA 01Y5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 165,714.13
  CATU EL 13,8 kV CATU  POJUCA 01Y4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 165,714.13
  CATU EL 13,8 kV CATU  CID. CATU DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 165,714.13
  CATU EL 13,8 kV CATU  CATU 01Y1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 165,714.13
  CATU RTS 13,8 kV 5 Mvar CATU RT2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  CATU RTS 13,8 kV 5 MVAr CATU RT1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  CATU MC 230 kV TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 220,807.62
  CATU MC 230 kV TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 220,807.62
  CATU EL 230 kV CATU LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  CATU EL 230 kV CATU LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  CATU EL 230 kV CATU LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  CATU EL 230 kV CATU LT 230 kV CATU /G.MANGABEIRA C-1 BA RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  CATU EL 230 kV CATU LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  CATU EL 230 kV CATU  SCHIN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  CATU EL 230 kV CATU  FERBASA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  CATU MC 230 kV TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBNI REA 2173/2009 24/09/2013 23/09/2041 277,644.87
  CATU MC 69 kV TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBNI REA 2173/2009 24/09/2013 23/09/2043 361,446.36
  CATU TR 230/69 kV CATU TR3 BA RBF FT TR 230/69 kV CATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  CATU TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  CATU RTS 13,8 kV 5 Mvar CATU RT2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 395,132.42
  CATU RTS 13,8 kV 5 MVAr CATU RT1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 395,132.42
  CATU MC 230 kV TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 484,357.56
  CATU MC 230 kV TR 230/69 kV CATU TR1 BA RBF FT TR 230/69 kV CATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 484,357.56
  CATU EL 69 kV CATU  DIST8 DIT   061/2001 IPCA RCDM REN 905/2020 28/05/2021 27/05/2049 567,373.10
  CATU EL 69 kV CATU  DIST7 DIT   061/2001 IPCA RCDM REN 905/2020 28/05/2021 27/05/2049 567,373.10
  CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 708,577.34
  CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 978,109.13
  CATU TR 230/69 kV CATU TR2 BA RBF FT TR 230/69 kV CATU TR2 BA 061/2001 IPCA RBNI REA 2173/2009 24/09/2013 23/09/2047 1,463,572.71
  CATU MG 230 kV CATU MG1 BA RB FT MG 230 kV CATU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,145,553.48
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RMEL REN 643/2014 16/08/2014 15/08/2044 20,860.44
  CAUIPE MC 69 kV TT 69/13,8 kV CAUIPE TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-2 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-1 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  CAUIPE MG 230 kV CAUIPE MG1 CE RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RMEL REN 643/2014 31/10/2013 30/10/2030 28,197.89
  CAUIPE MG 230 kV CAUIPE MG1 CE RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RMEL REN 443/2011 9/7/2016 8/7/2033 31,996.60
  CAUIPE IB 69 kV MG 230 kV CAUIPE MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  CAUIPE IB 69 kV MG 230 kV CAUIPE MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  CAUIPE MC 69 kV TR 230/69 kV CAUIPE TR2 CE RBF FT TR 230/69 kV CAUIPE TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  CAUIPE MC 69 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  CAUIPE EL 69 kV CAUIPE  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CAUIPE EL 69 kV CAUIPE  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CAUIPE EL 69 kV CAUIPE  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CAUIPE EL 69 kV CAUIPE  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CAUIPE EL 69 kV CAUIPE  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CAUIPE EL 69 kV CAUIPE  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CAUIPE EL 69 kV CAUIPE  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CAUIPE MC 69 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  CAUIPE TT 69/13,8 kV CAUIPE TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  CAUIPE EL 69 kV CAUIPE  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  CAUIPE EL 69 kV CAUIPE  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  CAUIPE EL 69 kV CAUIPE  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  CAUIPE EL 69 kV CAUIPE  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  CAUIPE IB 230 kV MG 230 kV CAUIPE MG1 CE IB1 RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  CAUIPE TT 69/13,8 kV CAUIPE TA1 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  CAUIPE IB 69 kV MG 230 kV CAUIPE MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  CAUIPE MC 230 kV TR 230/69 kV CAUIPE TR2 CE RBF FT TR 230/69 kV CAUIPE TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  CAUIPE MC 230 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  CAUIPE MC 69 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  CAUIPE MC 69 kV TR 230/69 kV CAUIPE TR3 CE RBF FT TR 230/69 kV CAUIPE TR3 CE 061/2001 IPCA RBNI REA 2968/2011 17/06/2018 17/06/2052 209,084.45
  CAUIPE MC 230 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-2 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /FORTALEZA II C-1 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  CAUIPE EL 69 kV CAUIPE  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  CAUIPE EL 69 kV CAUIPE  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  CAUIPE EL 69 kV CAUIPE  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  CAUIPE EL 69 kV CAUIPE  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  CAUIPE TT 69/13,8 kV CAUIPE TA1 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBNI REA 2460/2010 21/11/2013 20/11/2042 300,763.01
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  CAUIPE TR 230/69 kV CAUIPE TR2 CE RBF FT TR 230/69 kV CAUIPE TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15

 

62 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  CAUIPE TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  CAUIPE MC 230 kV TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  CAUIPE MC 230 kV TR 230/69 kV CAUIPE TR3 CE RBF FT TR 230/69 kV CAUIPE TR3 CE 061/2001 IPCA RBNI REA 2968/2011 17/06/2018 17/06/2052 487,840.03
  CAUIPE TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  CAUIPE MG 230 kV CAUIPE MG1 CE RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 550,861.11
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  CAUIPE EL 230 kV CAUIPE LT 230 kV CAUIPE /MARACANAU C-1 CE RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  CAUIPE MG 230 kV CAUIPE MG1 CE RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 760,400.10
  CAUIPE TR 230/69 kV CAUIPE TR3 CE RBF FT TR 230/69 kV CAUIPE TR3 CE 061/2001 IPCA RBNI REA 2968/2011 17/06/2018 17/06/2058 1,044,984.30
  CAUIPE TR 230/69 kV CAUIPE TR1 CE RBF FT TR 230/69 kV CAUIPE TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  CAUIPE MG 230 kV CAUIPE MG1 CE RB FT MG 230 kV CAUIPE MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,667,992.89
  CEARA MIRIM II MG 500 kV CEARA MIRIM II MG1 RN RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035 26,493.25
  CEARA MIRIM II MG 230 kV CEARA MIRIM II MG4 RN RB FT MG 230 kV CEARA MIRIM II MG4 RN 019/2010 IPCA RBNI DSP 1169/2022 1/7/2022 30/06/2055 39,781.30
  CEARA MIRIM II IB 230 kV MG 500 kV CEARA MIRIM II MG1 RN IB1 RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 153,638.04
  CEARA MIRIM II EL 230 kV CEARA MIRIM II LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN RB FT LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN 019/2010 IPCA RBNI DSP 1169/2022 1/7/2022 30/06/2051 201,322.66
  CEARA MIRIM II EL 230 kV CEARA MIRIM II LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN 019/2010 IPCA RBNI DSP 1169/2022 1/7/2022 30/06/2051 201,322.66
  CEARA MIRIM II MC 230 kV TR 500/230 kV CEARA MIRIM II TR2 RN RB FT TR 500/230 kV CEARA MIRIM II TR2 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 202,749.51
  CEARA MIRIM II MC 230 kV TR 500/230 kV CEARA MIRIM II TR1 RN RB FT TR 500/230 kV CEARA MIRIM II TR1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 202,749.51
  CEARA MIRIM II MC 230 kV CE 150/-75 Mvar CEARA MIRIM II CE1 RN RB FT CE 150/-75 Mvar CEARA MIRIM II CE1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 206,442.78
  CEARA MIRIM II EL 230 kV CEARA MIRIM II LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 284,637.91
  CEARA MIRIM II RTL 500 kV 33,33 Mvar CEARA MIRIM II RTR2 RN RB FT RTL 500 kV 33,33 Mvar CEARA MIRIM II RTR2 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 301,591.81
  CEARA MIRIM II MC 500 kV RTL 500 kV 100 Mvar CEARA MIRIM II RTL2 RN RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 330,266.89
  CEARA MIRIM II RTB 500 kV 50 Mvar CEARA MIRIM II RTR1 RN RB FT RTB 500 kV 50 Mvar CEARA MIRIM II RTR1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 345,926.10
  CEARA MIRIM II MC 500 kV RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN RB FT RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 515,512.05
  CEARA MIRIM II EL 230 kV CEARA MIRIM II LT 230 kV TOUROS /CEARA MIRIM II C-1 RN RB FT LT 230 kV TOUROS /CEARA MIRIM II C-1 RN 018/2012 IPCA RBL CC 018/2012 12/5/2017 1/6/2042 537,773.26
  CEARA MIRIM II MC 500 kV TR 500/230 kV CEARA MIRIM II TR2 RN RB FT TR 500/230 kV CEARA MIRIM II TR2 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 551,635.62
  CEARA MIRIM II MC 500 kV TR 500/230 kV CEARA MIRIM II TR1 RN RB FT TR 500/230 kV CEARA MIRIM II TR1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 551,635.62
  CEARA MIRIM II IB 500 kV MG 500 kV CEARA MIRIM II MG1 RN IB3 RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 590,048.88
  CEARA MIRIM II IB 500 kV MG 500 kV CEARA MIRIM II MG1 RN IB2 RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 590,048.88
  CEARA MIRIM II IB 500 kV MG 500 kV CEARA MIRIM II MG1 RN IB1 RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 590,048.88
  CEARA MIRIM II EL 500 kV CEARA MIRIM II LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN RB FT LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 618,609.07
  CEARA MIRIM II EL 500 kV CEARA MIRIM II LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 618,609.07
  CEARA MIRIM II TR 500/230 kV CEARA MIRIM II TRR1 RN RB FT TR 500/230 kV CEARA MIRIM II TRR1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 756,394.10
  CEARA MIRIM II RTL 500 kV 100 Mvar CEARA MIRIM II RTL2 RN RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 904,776.44
  CEARA MIRIM II RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN RB FT RTB 500 kV 150 Mvar CEARA MIRIM II RTB1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 1,037,778.30
  CEARA MIRIM II MG 500 kV CEARA MIRIM II MG1 RN RB FT MG 500 kV CEARA MIRIM II MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 1,045,603.40
  CEARA MIRIM II TR 500/230 kV CEARA MIRIM II TR2 RN RB FT TR 500/230 kV CEARA MIRIM II TR2 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 2,269,183.30
  CEARA MIRIM II TR 500/230 kV CEARA MIRIM II TR1 RN RB FT TR 500/230 kV CEARA MIRIM II TR1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 2,269,183.30
  CEARA MIRIM II CE 150/-75 Mvar CEARA MIRIM II CE1 RN RB FT CE 150/-75 Mvar CEARA MIRIM II CE1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 3,600,560.47
  CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RMEL REN 443/2011 22/09/2016 21/09/2049 10,886.01
  CIC. DANTAS TR 69/13,8 kV CIC. DANTAS TR3 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 25/11/2015 24/11/2032 34,372.61
  CIC. DANTAS TR 69/13,8 kV CIC. DANTAS TR3 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  CIC. DANTAS IB 69 kV MG 230 kV CIC. DANTAS MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  CIC. DANTAS MC 69 kV TR 69/13,8 kV CIC. DANTAS TR3 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  CIC. DANTAS MC 69 kV TR 230/69 kV CIC. DANTAS TR3 BA RBF FT TR 230/69 kV CIC. DANTAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  CIC. DANTAS EL 69 kV CIC. DANTAS  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  CIC. DANTAS TR 69/13,8 kV CIC. DANTAS TR3 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBNI REA 5211/2015 17/03/2018 17/03/2050 89,305.72
  CIC. DANTAS TT 69/13,8 kV CIC. DANTAS TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RMEL REN 643/2014 23/10/2013 22/10/2046 104,374.18
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RMEL REN 643/2014 1/11/2013 31/10/2046 104,444.05
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RMEL REN 643/2014 8/11/2013 7/11/2046 104,498.39
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 20/11/2013 19/11/2046 104,591.53
  CIC. DANTAS IB 230 kV MG 230 kV CIC. DANTAS MG1 BA IB1 RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RMEL REN 643/2014 4/12/2013 3/12/2046 104,700.20
  CIC. DANTAS EL 69 kV CIC. DANTAS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  CIC. DANTAS IB 230 kV MG 230 kV CIC. DANTAS MG1 BA IB1 RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  CIC. DANTAS MC 230 kV TR 230/69 kV CIC. DANTAS TR3 BA RBF FT TR 230/69 kV CIC. DANTAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  CIC. DANTAS RTS 69 kV 40 Mvar CIC. DANTAS RT1 BA RBF FT TR 230/69 kV CIC. DANTAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 187,504.77
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  CIC. DANTAS EL 230 kV CIC. DANTAS LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBNI REA 2823/2011 30/12/2012 29/12/2040 240,486.34
  CIC. DANTAS MC 69 kV TR 230/69 kV CIC. DANTAS TR5 BA RBF FT TR 230/69 kV CIC. DANTAS TR5 BA 061/2001 IPCA RBNI REA 2823/2011 30/12/2012 29/12/2042 246,612.28
  CIC. DANTAS TR 230/69 kV CIC. DANTAS TR3 BA RBF FT TR 230/69 kV CIC. DANTAS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 257,282.21
  CIC. DANTAS MC 69 kV TR 230/69 kV CIC. DANTAS TR4 BA RBF FT TR 230/69 kV CIC. DANTAS TR4 BA 061/2001 IPCA RBNI REA 5211/2015 17/03/2018 17/03/2041 348,303.43
  CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 526,517.38
  CIC. DANTAS MC 230 kV TR 230/69 kV CIC. DANTAS TR4 BA RBF FT TR 230/69 kV CIC. DANTAS TR4 BA 061/2001 IPCA RBNI REA 5211/2015 17/03/2018 17/03/2041 654,925.61
  CIC. DANTAS MG 230 kV CIC. DANTAS MG1 BA RB FT MG 230 kV CIC. DANTAS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 726,796.40
  CIC. DANTAS MC 230 kV TR 230/69 kV CIC. DANTAS TR5 BA RBF FT TR 230/69 kV CIC. DANTAS TR5 BA 061/2001 IPCA RBNI REA 2823/2011 30/12/2012 29/12/2042 743,925.10
  CIC. DANTAS TR 230/69 kV CIC. DANTAS TR4 BA RBF FT TR 230/69 kV CIC. DANTAS TR4 BA 061/2001 IPCA RBNI REA 5211/2015 17/03/2018 17/03/2052 951,289.08
  CIC. DANTAS TR 230/69 kV CIC. DANTAS TR5 BA RBF FT TR 230/69 kV CIC. DANTAS TR5 BA 061/2001 IPCA RBNI REA 2823/2011 30/12/2012 29/12/2046 1,188,848.18
  COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RMEL REN 643/2014 17/12/2015 16/12/2029 15,075.67
  COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBNI REA 7761/2019 31/08/2015 30/08/2030 23,691.05
  COREMAS MC 69 kV TT 69/13,8 kV COREMAS TA1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RMEL REN 643/2014 16/10/2015 15/10/2032 30,963.76
  COREMAS EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBNI REA 5861/2016 8/12/2013 7/12/2041 35,234.66
  COREMAS IB 69 kV MG 230 kV COREMAS MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  COREMAS MC 13,8 kV TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  COREMAS IB 69 kV MG 230 kV COREMAS MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  COREMAS MC 13,8 kV RTB 13,8 kV 5 MVAr COREMAS RT1 PB RBF FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  COREMAS MC 69 kV TR 230/69 kV COREMAS TR3 PB RBF FT TR 230/69 kV COREMAS TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  COREMAS MC 69 kV TR 230/69 kV COREMAS TR2 PB RBF FT TR 230/69 kV COREMAS TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  COREMAS MC 69 kV TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  COREMAS EL 69 kV COREMAS  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25

 

63 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  COREMAS EL 69 kV COREMAS  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COREMAS EL 69 kV COREMAS  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COREMAS EL 69 kV COREMAS  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COREMAS EL 69 kV COREMAS  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COREMAS EL 69 kV COREMAS  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COREMAS EL 69 kV COREMAS  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COREMAS EL 69 kV COREMAS  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RMEL REN 643/2014 30/11/2013 29/11/2041 79,761.38
  COREMAS MC 69 kV TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  COREMAS TT 69/13,8 kV COREMAS TA1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  COREMAS EL 69 kV COREMAS  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  COREMAS EL 69 kV COREMAS  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  COREMAS EL 69 kV COREMAS  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  COREMAS EL 69 kV COREMAS  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  COREMAS EL 69 kV COREMAS  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  COREMAS TT 69/13,8 kV COREMAS TA1 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  COREMAS RTB 13,8 kV 5 MVAr COREMAS RT1 PB RBF FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  COREMAS IB 69 kV MG 230 kV COREMAS MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  COREMAS IB 230 kV MG 230 kV COREMAS MG1 PB IB1 RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  COREMAS MC 230 kV TR 230/69 kV COREMAS TR3 PB RBF FT TR 230/69 kV COREMAS TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  COREMAS MC 230 kV TR 230/69 kV COREMAS TR2 PB RBF FT TR 230/69 kV COREMAS TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  COREMAS MC 230 kV TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  COREMAS RTB 13,8 kV 5 MVAr COREMAS RT1 PB RBF FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  COREMAS IB 230 kV MG 230 kV COREMAS MG1 PB IB1 RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  COREMAS MC 230 kV TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  COREMAS EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  COREMAS TT 69/13,8 kV COREMAS TA1 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  COREMAS EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  COREMAS TR 230/69 kV COREMAS TR3 PB RBF FT TR 230/69 kV COREMAS TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  COREMAS TR 230/69 kV COREMAS TR2 PB RBF FT TR 230/69 kV COREMAS TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  COREMAS TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  COREMAS RTB 13,8 kV 5 MVAr COREMAS RT1 PB RBF FT RTB 13,8 kV 5 MVAr COREMAS RT1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 395,132.42
  COREMAS EL 230 kV COREMAS LT 230 kV MILAGRES /COREMAS C-2 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-2 CE/PB 008/2005 IGPM RBL CC 008/2005 25/09/2009 4/3/2035 453,347.49
  COREMAS TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 531,711.37
  COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 733,966.10
  COREMAS TR 230/69 kV COREMAS TR1 PB RBF FT TR 230/69 kV COREMAS TR1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  COREMAS MG 230 kV COREMAS MG1 PB RB FT MG 230 kV COREMAS MG1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,610,007.99
  COTEGIPE MC 69 kV BC 69 kV 27,1 Mvar COTEGIPE BC2 BA DIT   061/2001 IPCA RMEL REN 443/2011 4/2/2016 3/2/2046 2,423.65
  COTEGIPE TT 69/13,8 kV COTEGIPE TA1 BA DIT   061/2001 IPCA RMEL REN 443/2011 19/01/2016 18/01/2046 2,442.49
  COTEGIPE MC 69 kV BC 69 kV 20,3 Mvar COTEGIPE BC1 BA DIT   061/2001 IPCA RMEL REN 443/2011 24/05/2016 23/05/2046 4,800.12
  COTEGIPE IB 230 kV MG 230 kV COTEGIPE MG1 BA IB1 RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RMEL REN 443/2011 14/01/2016 13/01/2046 4,883.10
  COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RMEL REN 443/2011 4/2/2016 3/2/2046 7,270.96
  COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR4 BA RBF FT TR 230/69 kV COTEGIPE TR4 BA 061/2001 IPCA RMEL REN 443/2011 5/2/2016 4/2/2046 7,271.51
  COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RMEL REN 443/2011 5/2/2016 4/2/2046 7,271.52
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RMEL REN 443/2011 26/01/2016 25/01/2046 7,331.37
  COTEGIPE EL 69 kV COTEGIPE  CIM-ARATU 02L1 DIT   061/2001 IPCA RMEL REN 443/2011 3/2/2016 2/2/2046 9,693.88
  COTEGIPE EL 69 kV COTEGIPE  MILLENIUM  02C1 DIT   061/2001 IPCA RMEL REN 443/2011 15/01/2016 14/01/2046 9,766.93
  COTEGIPE EL 69 kV COTEGIPE  MILLENIUM  02C2 DIT   061/2001 IPCA RMEL REN 443/2011 18/01/2016 17/01/2046 9,769.17
  COTEGIPE EL 69 kV COTEGIPE  CAMACARI I 02J3 DIT   061/2001 IPCA RMEL REN 443/2011 21/01/2016 20/01/2046 9,771.41
  COTEGIPE EL 69 kV COTEGIPE  CAMACARI I 02J4 DIT   061/2001 IPCA RMEL REN 443/2011 22/01/2016 21/01/2046 9,772.16
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RMEL REN 443/2011 25/01/2016 24/01/2046 9,774.40
  COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 25,946.62
  COTEGIPE TR 69/13,8 kV COTEGIPE TR8 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  COTEGIPE MC 69 kV TR 69/13,8 kV COTEGIPE TR8 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 1814/2009 30/01/2013 29/01/2046 32,504.02
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046 32,504.02
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046 32,504.02
  COTEGIPE EL 69 kV COTEGIPE  MILLENIUM  02C2 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046 32,504.02
  COTEGIPE EL 69 kV COTEGIPE  MILLENIUM  02C1 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046 32,504.02
  COTEGIPE EL 69 kV COTEGIPE  CAMACARI I 02J4 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046 32,504.02
  COTEGIPE EL 69 kV COTEGIPE  CAMACARI I 02J3 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2013 29/01/2046 32,504.02
  COTEGIPE EL 69 kV COTEGIPE  CIA I 02C6 DIT   061/2001 IPCA RCDM REA 2040/2009 15/10/2013 14/10/2043 32,534.29
  COTEGIPE EL 69 kV COTEGIPE  CIA II 02L7 DIT   061/2001 IPCA RCDM REA 2376/2010 19/09/2013 18/09/2043 32,616.71
  COTEGIPE IB 69 kV MG 230 kV COTEGIPE MG1 BA IB1 DIT   061/2001 IPCA RCDM REA 1814/2009 1/2/2013 31/01/2045 34,966.66
  COTEGIPE EL 69 kV COTEGIPE  CIM-ARATU 02L1 DIT   061/2001 IPCA RCDM REA 1814/2009 14/04/2013 13/04/2045 35,158.54
  COTEGIPE EL 69 kV COTEGIPE  PARIPE 02L2 DIT   061/2001 IPCA RCDM REA 1814/2009 5/5/2013 4/5/2045 35,214.51
  COTEGIPE EL 69 kV COTEGIPE  EMBASA 02L3 DIT   061/2001 IPCA RCDM REA 1814/2009 13/06/2013 12/6/2045 35,318.44
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-2 BA DIT   061/2001 IPCA RCDM REA 1814/2009 11/8/2013 10/8/2045 35,475.67
  COTEGIPE EL 69 kV COTEGIPE  CIA II 02L7 DIT   061/2001 IPCA RCDM REA 1814/2009 19/09/2013 18/09/2045 35,579.60
  COTEGIPE EL 69 kV COTEGIPE  CIA I 02C6 DIT   061/2001 IPCA RCDM REA 1814/2009 15/10/2013 14/10/2045 35,648.88
  COTEGIPE EL 69 kV COTEGIPE  CIA II 02L8 DIT   061/2001 IPCA RCDM REA 1814/2009 25/10/2013 24/10/2045 35,675.54
  COTEGIPE EL 69 kV COTEGIPE  CIA I 02C9 DIT   061/2001 IPCA RCDM REA 1814/2009 14/12/2013 13/12/2045 35,808.78
  COTEGIPE IB 69 kV MG 230 kV COTEGIPE MG1 BA IB2 DIT   061/2001 IPCA RCDM REA 1814/2009 30/01/2014 29/01/2046 35,934.04
  COTEGIPE MC 69 kV TT 69/69 kV COTEGIPE TA2 BA DIT   061/2001 IPCA RCDM REA 7806/2019 18/06/2021 18/06/2036 37,762.90
  COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 7806/2019 22/06/2021 22/06/2052 39,137.08
  COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBNI REA 2837/2011 6/6/2014 5/6/2045 42,645.44
  COTEGIPE IB 69 kV MG 230 kV COTEGIPE MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  COTEGIPE IB 69 kV MG 230 kV COTEGIPE MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  COTEGIPE IB 69 kV MG 230 kV COTEGIPE MG1 BA IB2 DIT   061/2001 IPCA RCDM REA 7806/2019 18/06/2021 18/06/2039 55,171.85
  COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 7806/2019 22/06/2021 22/06/2061 56,703.83
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RCDM REA 2376/2010 28/02/2014 27/02/2045 57,037.47
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /SIBRA C-1 BA DIT   061/2001 IPCA RCDM REA 2837/2011 23/09/2013 22/09/2043 57,406.85
  COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2045 61,210.22
  COTEGIPE MC 69 kV TR 69/13,8 kV COTEGIPE TR8 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR3 BA RBF FT TR 230/69 kV COTEGIPE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20

 

64 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR1 BA RBF FT TR 230/69 kV COTEGIPE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  COTEGIPE MC 69 kV BC 69 kV 27,1 Mvar COTEGIPE BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  COTEGIPE MC 69 kV BC 69 kV 20,3 Mvar COTEGIPE BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COTEGIPE EL 69 kV COTEGIPE  PARIPE 02L2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COTEGIPE EL 69 kV COTEGIPE  MILLENIUM  02C2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COTEGIPE EL 69 kV COTEGIPE  MILLENIUM  02C1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COTEGIPE EL 69 kV COTEGIPE  EMBASA 02L3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COTEGIPE EL 69 kV COTEGIPE  CIM-ARATU 02L1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COTEGIPE EL 69 kV COTEGIPE  CIA II 02L8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COTEGIPE EL 69 kV COTEGIPE  CIA II 02L7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COTEGIPE EL 69 kV COTEGIPE  CIA I 02C9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COTEGIPE EL 69 kV COTEGIPE  CIA I 02C6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COTEGIPE EL 69 kV COTEGIPE  CAMACARI I 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COTEGIPE EL 69 kV COTEGIPE  CAMACARI I 02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  COTEGIPE EL 69 kV COTEGIPE LT 69 kV PITUACU /COTEGIPE C-2 BA DIT   061/2001 IPCA RCDM REA 2376/2010 11/8/2013 10/8/2044 82,338.82
  COTEGIPE EL 69 kV COTEGIPE  CIA II 02L7 DIT   061/2001 IPCA RCDM REA 2376/2010 19/09/2013 18/09/2044 82,592.30
  COTEGIPE EL 69 kV COTEGIPE  CIA I 02C6 DIT   061/2001 IPCA RCDM REA 2040/2009 15/10/2013 14/10/2044 82,761.28
  COTEGIPE EL 69 kV COTEGIPE  CIA I 02C9 DIT   061/2001 IPCA RCDM REA 2040/2009 14/12/2013 13/12/2044 83,151.23
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV CAMACARI IV /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 2891/2011 2/6/2014 1/6/2040 87,532.69
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /SIBRA C-1 BA DIT   061/2001 IPCA RCDM REA 2837/2011 26/09/2013 25/09/2046 94,340.16
  COTEGIPE BC 69 kV 20,3 Mvar COTEGIPE BC1 BA DIT   061/2001 IPCA RMEL REN 643/2014 18/09/2013 17/09/2033 96,517.49
  COTEGIPE IB 230 kV MG 230 kV COTEGIPE MG1 BA IB1 RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 2837/2011 4/9/2014 3/9/2046 101,896.20
  COTEGIPE BC 69 kV 20,3 Mvar COTEGIPE BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,338.74
  COTEGIPE EL 69 kV COTEGIPE  CIA II 02L8 DIT   061/2001 IPCA RCDM REA 2376/2010 28/10/2013 27/10/2044 115,564.38
  COTEGIPE IB 230 kV MG 230 kV COTEGIPE MG1 BA IB1 RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBNI REA 7806/2019 14/06/2021 14/06/2044 127,271.73
  COTEGIPE BC 69 kV 27,1 Mvar COTEGIPE BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 134,422.38
  COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR3 BA RBF FT TR 230/69 kV COTEGIPE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR1 BA RBF FT TR 230/69 kV COTEGIPE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 7806/2019 22/06/2021 22/06/2052 181,554.75
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV CAMACARI II /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 6258/2017 27/11/2020 27/11/2050 195,616.42
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /USIBA C-1 BA DIT   061/2001 IPCA RCDM REA 2837/2011 27/12/2013 26/12/2044 207,801.04
  COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR1 BA RBF FT TR 230/69 kV COTEGIPE TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2045 212,358.48
  COTEGIPE TT 69/13,8 kV COTEGIPE TA1 BA DIT   061/2001 IPCA RCDM REA 3578/2012 17/01/2016 16/01/2046 217,773.14
  COTEGIPE TT 69/69 kV COTEGIPE TA2 BA DIT   061/2001 IPCA RCDM REA 7806/2019 18/06/2021 18/06/2051 219,273.38
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /USIBA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /SIBRA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /MATATU C-1 BA RB FT LT 230 kV COTEGIPE /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV CAMACARI IV /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  COTEGIPE EL 230 kV COTEGIPE LT 230 kV CAMACARI II /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  COTEGIPE TR 230/69 kV COTEGIPE TR3 BA RBF FT TR 230/69 kV COTEGIPE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  COTEGIPE TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  COTEGIPE TR 230/69 kV COTEGIPE TR1 BA RBF FT TR 230/69 kV COTEGIPE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR5 BA RBF FT TR 230/69 kV COTEGIPE TR5 BA 061/2001 IPCA RBNI REA 7806/2019 14/06/2021 14/06/2049 425,989.55
  COTEGIPE MC 69 kV TR 230/69 kV COTEGIPE TR4 BA RBF FT TR 230/69 kV COTEGIPE TR4 BA 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2047 461,664.74
  COTEGIPE TR 230/69 kV COTEGIPE TR2 BA RBF FT TR 230/69 kV COTEGIPE TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 671,728.41
  COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR5 BA RBF FT TR 230/69 kV COTEGIPE TR5 BA 061/2001 IPCA RBNI REA 7806/2019 14/06/2021 14/06/2049 860,285.69
  COTEGIPE MG 230 kV COTEGIPE MG1 BA RB FT MG 230 kV COTEGIPE MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 927,243.45
  COTEGIPE MC 230 kV TR 230/69 kV COTEGIPE TR4 BA RBF FT TR 230/69 kV COTEGIPE TR4 BA 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2047 1,184,143.04
  COTEGIPE TR 230/69 kV COTEGIPE TR5 BA RBF FT TR 230/69 kV COTEGIPE TR5 BA 061/2001 IPCA RBNI REA 7806/2019 14/06/2021 14/06/2056 1,271,335.80
  COTEGIPE TR 230/69 kV COTEGIPE TR4 BA RBF FT TR 230/69 kV COTEGIPE TR4 BA 061/2001 IPCA RBNI REA 5166/2015 29/12/2017 28/12/2051 1,527,646.91
  COTEMINAS IB 230 kV MG 230 kV COTEMINAS MG1 PB IB1 RB FT MG 230 kV COTEMINAS MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  COTEMINAS EL 230 kV COTEMINAS LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  COTEMINAS EL 230 kV COTEMINAS LT 230 kV C.GRANDE II /COTEMINAS C-1 PB RB FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  COTEMINAS MG 230 kV COTEMINAS MG1 PB RB FT MG 230 kV COTEMINAS MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 395,857.38
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2047 3,895.74
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2047 3,895.74
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RMEL REN 443/2011 26/06/2017 25/06/2047 3,896.03
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J3 DIT   061/2001 IPCA RMEL REN 443/2011 20/12/2015 19/12/2038 4,595.08
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N3 DIT   061/2001 IPCA RMEL REN 443/2011 12/1/2016 11/1/2039 4,762.90
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RMEL REN 443/2011 20/12/2015 19/12/2038 6,892.62
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J4 DIT   061/2001 IPCA RMEL REN 443/2011 3/7/2016 2/7/2039 7,018.37
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 8,236.95
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 8,236.95
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE DIT   061/2001 IPCA RCDM REA 2040/2009 9/4/2013 8/4/2043 11,015.79
  DELM. GOUVEIA IB 69 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 16,473.90
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J9 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 16,473.90
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBNI REA 2040/2009 26/01/2014 25/01/2044 17,433.57
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RMEL REN 643/2014 8/2/2014 7/2/2044 20,551.60
  DELM. GOUVEIA EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RMEL REN 643/2014 10/8/2014 9/8/2044 20,850.63
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE DIT   061/2001 IPCA RCDM REA 2040/2009 9/4/2013 8/4/2043 22,031.56
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBNI REA 2040/2009 10/10/2012 9/10/2043 25,563.46
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  DIA MACEDO 02J6 DIT   061/2001 IPCA RCDM REA 2040/2009 3/3/2013 2/3/2044 25,860.64
  DELM. GOUVEIA MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA2 CE DIT   061/2001 IPCA RCDM REA 2040/2009 30/05/2013 29/05/2044 26,042.23
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RMEL REN 643/2014 28/01/2014 27/01/2031 26,375.57
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBNI REA 2040/2009 26/01/2014 25/01/2045 26,539.60
  DELM. GOUVEIA MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA1 CE DIT   061/2001 IPCA RCDM REA 2040/2009 26/01/2014 25/01/2045 26,539.60
  DELM. GOUVEIA MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA2 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31

 

65 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  DELM. GOUVEIA MC 69 kV TT 69/13,8 kV DELM. GOUVEIA TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J8 DIT   061/2001 IPCA RCDM REA 2040/2009 30/12/2012 29/12/2042 28,338.16
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J7 DIT   061/2001 IPCA RCDM REA 2040/2009 30/12/2012 29/12/2042 28,338.16
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J4 DIT   061/2001 IPCA RCDM REA 2040/2009 30/12/2012 29/12/2042 28,338.16
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J3 DIT   061/2001 IPCA RCDM REA 2040/2009 30/12/2012 29/12/2042 28,338.16
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N3 DIT   061/2001 IPCA RCDM REA 2040/2009 30/12/2012 29/12/2042 28,338.16
  DELM. GOUVEIA TR 69/13,8 kV DELM. GOUVEIA TR5 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RMEL REN 643/2014 15/12/2013 14/12/2030 28,371.97
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  DIA MACEDO 02J6 DIT   061/2001 IPCA RCDM REA 2040/2009 3/3/2013 2/3/2043 31,946.37
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N2 DIT   061/2001 IPCA RCDM REA 2040/2009 5/2/2013 4/2/2043 32,026.19
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J9 DIT   061/2001 IPCA RCDM REA 2040/2009 13/03/2013 12/3/2043 32,120.25
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J8 DIT   061/2001 IPCA RCDM REA 2040/2009 21/03/2013 20/03/2043 32,141.16
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J7 DIT   061/2001 IPCA RCDM REA 2040/2009 27/03/2013 26/03/2043 32,156.84
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N3 DIT   061/2001 IPCA RCDM REA 2040/2009 9/4/2013 8/4/2043 32,190.80
  DELM. GOUVEIA TR 69/13,8 kV DELM. GOUVEIA TR5 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  DELM. GOUVEIA IB 69 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE DIT   061/2001 IPCA RCDM REA 2040/2009 9/4/2013 8/4/2043 44,063.13
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RMEL REN 643/2014 28/02/2015 27/02/2043 49,136.26
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  ALDEOTA 02N1 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 49,445.55
  DELM. GOUVEIA IB 69 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/12/2016 28/12/2044 76,014.43
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  DIA MACEDO 02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  ALDEOTA 02N1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBNI REA 2040/2009 11/12/2012 10/12/2043 77,074.27
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBNI REA 2040/2009 24/03/2013 23/03/2044 77,711.94
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N2 DIT   061/2001 IPCA RCDM REA 2040/2009 5/2/2013 4/2/2044 81,123.46
  DELM. GOUVEIA TR 69/13,8 kV DELM. GOUVEIA TR5 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  DELM. GOUVEIA TT 69/13,8 kV DELM. GOUVEIA TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  DELM. GOUVEIA MC 69 kV BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  FORTALEZA 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  DIA MACEDO 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  ALDEOTA 02N1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  AGUA FRIA 02N2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  DELM. GOUVEIA BC 69 kV 24,4 Mvar DELM. GOUVEIA BC4 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 126,400.27
  DELM. GOUVEIA BC 69 kV 24,4 Mvar DELM. GOUVEIA BC3 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 126,400.27
  DELM. GOUVEIA BC 69 kV 24,4 Mvar DELM. GOUVEIA BC2 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 126,400.27
  DELM. GOUVEIA BC 69 kV 24,4 Mvar DELM. GOUVEIA BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 126,400.27
  DELM. GOUVEIA TT 69/13,8 kV DELM. GOUVEIA TA1 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  DELM. GOUVEIA IB 230 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  DELM. GOUVEIA MC 230 kV BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 188,063.88
  DELM. GOUVEIA IB 230 kV MG 230 kV DELM. GOUVEIA MG1 CE IB1 RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  DELM. GOUVEIA BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,444.63
  DELM. GOUVEIA TT 69/13,8 kV DELM. GOUVEIA TA2 CE DIT   061/2001 IPCA RCDM REA 3578/2012 4/12/2016 3/12/2046 222,411.74
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  TAUAPE 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  DIA MACEDO 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  DELM. GOUVEIA EL 69 kV DELM. GOUVEIA  ALDEOTA 02N1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  DELM. GOUVEIA EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  DELM. GOUVEIA EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  DELM. GOUVEIA MC 230 kV BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 259,600.45
  DELM. GOUVEIA BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,310.27
  DELM. GOUVEIA TT 69/13,8 kV DELM. GOUVEIA TA1 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05

 

66 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  DELM. GOUVEIA EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  DELM. GOUVEIA EL 230 kV DELM. GOUVEIA LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  DELM. GOUVEIA MC 69 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBNI REA 2040/2009 3/3/2013 2/3/2043 355,551.23
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  DELM. GOUVEIA MC 230 kV TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  DELM. GOUVEIA MC 230 kV BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 569,452.46
  DELM. GOUVEIA BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE RB FT BC 230 kV 50,5 MVAr DELM. GOUVEIA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 603,913.08
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 609,002.27
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 840,657.26
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR4 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR3 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR2 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  DELM. GOUVEIA TR 230/69 kV DELM. GOUVEIA TR1 CE RBF FT TR 230/69 kV DELM. GOUVEIA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  DELM. GOUVEIA MG 230 kV DELM. GOUVEIA MG1 CE RB FT MG 230 kV DELM. GOUVEIA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,844,042.81
  ELISEU MARTIN MC 69 kV TT 69/0 kV ELISEU MARTIN TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  ELISEU MARTIN MG 230 kV ELISEU MARTIN MG1 PI RB FT MG 230 kV ELISEU MARTIN MG1 PI 061/2001 IPCA RMEL REN 443/2011 15/01/2016 14/01/2033 32,636.96
  ELISEU MARTIN IB 69 kV MG 230 kV ELISEU MARTIN MG1 PI IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  ELISEU MARTIN MC 69 kV TR 230/69 kV ELISEU MARTIN TR2 PI RBF FT TR 230/69 kV ELISEU MARTIN TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ELISEU MARTIN MC 69 kV TR 230/69 kV ELISEU MARTIN TR1 PI RBF FT TR 230/69 kV ELISEU MARTIN TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ELISEU MARTIN EL 69 kV ELISEU MARTIN  BOM JESUS-02L2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ELISEU MARTIN EL 69 kV ELISEU MARTIN  BERTOLINEA-02L1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ELISEU MARTIN TT 69/0 kV ELISEU MARTIN TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  ELISEU MARTIN IB 230 kV MG 230 kV ELISEU MARTIN MG1 PI IB1 RB FT MG 230 kV ELISEU MARTIN MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  ELISEU MARTIN MC 230 kV TR 230/69 kV ELISEU MARTIN TR2 PI RBF FT TR 230/69 kV ELISEU MARTIN TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  ELISEU MARTIN MC 230 kV TR 230/69 kV ELISEU MARTIN TR1 PI RBF FT TR 230/69 kV ELISEU MARTIN TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  ELISEU MARTIN EL 230 kV ELISEU MARTIN LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  ELISEU MARTIN TR 230/69 kV ELISEU MARTIN TR2 PI RBF FT TR 230/69 kV ELISEU MARTIN TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 257,282.21
  ELISEU MARTIN TR 230/69 kV ELISEU MARTIN TR1 PI RBF FT TR 230/69 kV ELISEU MARTIN TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 257,282.21
  ELISEU MARTIN MG 230 kV ELISEU MARTIN MG1 PI RB FT MG 230 kV ELISEU MARTIN MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 473,812.50
  EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2043 10,749.63
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 13,902.50
  EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 25,946.62
  EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035 27,257.38
  EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RMEL REN 443/2011 1/3/2016 28/02/2033 31,493.72
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR4 BA RBF FT TR 230/138 kV EUNAPOLIS TR4 BA 061/2001 IPCA RBNI REA 4542/2014 24/11/2014 23/11/2045 32,997.93
  EUNAPOLIS RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RMEL REN 643/2014 14/10/2013 13/10/2048 33,680.86
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RMEL REN 443/2011 3/4/2016 2/4/2046 47,429.13
  EUNAPOLIS RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA RB FT RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,346.97
  EUNAPOLIS RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA RB FT RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 87,443.17
  EUNAPOLIS IB 138 kV MG 230 kV EUNAPOLIS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,365.85
  EUNAPOLIS MC 230 kV RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  EUNAPOLIS MC 230 kV RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  EUNAPOLIS RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA RB FT RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,656.51
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR3 BA RBF FT TR 230/138 kV EUNAPOLIS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  EUNAPOLIS IB 230 kV MG 230 kV EUNAPOLIS MG1 BA IB1 RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  EUNAPOLIS IB 138 kV MG 230 kV EUNAPOLIS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 124,739.62
  EUNAPOLIS MC 230 kV RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,194.51
  EUNAPOLIS RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA RB FT RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 147,226.99
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR3 BA RBF FT TR 230/138 kV EUNAPOLIS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 161,455.34
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 161,455.34
  EUNAPOLIS IB 230 kV MG 230 kV EUNAPOLIS MG1 BA IB1 RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 166,420.18
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 190,040.91
  EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 190,040.91
  EUNAPOLIS RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA RB FT RTL 230 kV 3,7 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 191,812.95
  EUNAPOLIS MC 230 kV RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 201,804.63
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBNI REA 4542/2014 24/11/2014 23/11/2045 233,771.68
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 240,745.16
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 240,745.16
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 240,745.16
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 245,694.72
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBNI REA 4542/2014 24/11/2014 23/11/2044 249,063.02
  EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 262,329.51
  EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 262,329.51
  EUNAPOLIS IB 138 kV MG 230 kV EUNAPOLIS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 273,625.41
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62

 

67 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR4 BA RBF FT TR 230/138 kV EUNAPOLIS TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 317,949.90
  EUNAPOLIS RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 319,969.53
  EUNAPOLIS RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA RB FT RTB 230 kV 7,4 Mvar EUNAPOLIS RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 322,953.10
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 354,164.03
  EUNAPOLIS MC 138 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 354,164.03
  EUNAPOLIS IB 230 kV MG 230 kV EUNAPOLIS MG1 BA IB1 RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 365,054.76
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR3 BA RBF FT TR 230/138 kV EUNAPOLIS TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,942.44
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,942.44
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,942.44
  EUNAPOLIS RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 441,680.96
  EUNAPOLIS MC 230 kV RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 442,673.12
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  EUNAPOLIS MC 230 kV TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 528,092.00
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 528,092.00
  EUNAPOLIS EL 138 kV EUNAPOLIS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 528,092.00
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 532,748.94
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 532,748.94
  EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 575,438.85
  EUNAPOLIS RTL 230 kV 11,1 Mvar EUNAPOLIS RT1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 575,438.85
  EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 592,827.58
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  EUNAPOLIS EL 230 kV EUNAPOLIS LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA 018/2009 IPCA RBL CC 018/2009 3/8/2009 3/8/2039 732,601.09
  EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 818,329.97
  EUNAPOLIS RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA RB FT RTB 230 kV 22,2 Mvar EUNAPOLIS RT3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 968,859.29
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR2 BA RBF FT TR 230/138 kV EUNAPOLIS TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,168,623.52
  EUNAPOLIS TR 230/138 kV EUNAPOLIS TR1 BA RBF FT TR 230/138 kV EUNAPOLIS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,168,623.52
  EUNAPOLIS MG 230 kV EUNAPOLIS MG1 BA RB FT MG 230 kV EUNAPOLIS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,795,066.27
  EXTREMOZ II MG 230 kV EXTREMOZ II MG1 RN RB FT MG 230 kV EXTREMOZ II MG1 RN 019/2010 IPCA RBNI REA 8314/2019 31/08/2018 30/08/2033 6,527.72
  EXTREMOZ II MG 230 kV EXTREMOZ II MG1 RN RB FT MG 230 kV EXTREMOZ II MG1 RN 019/2010 IPCA RBNI REN 443/2011 16/05/2016 15/05/2047 15,046.02
  EXTREMOZ II MG 230 kV EXTREMOZ II MG1 RN RB FT MG 230 kV EXTREMOZ II MG1 RN 019/2010 IPCA RMEL REN 643/2014 31/03/2015 30/03/2030 78,223.96
  EXTREMOZ II MG 230 kV EXTREMOZ II MG2 RN RB FT MG 230 kV EXTREMOZ II MG2 RN 061/2001 IPCA RBNI REA 3208/2011 9/12/2019 9/12/2052 109,499.18
  EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBNI REA 10141/2021 15/08/2016 15/08/2044 147,475.09
  EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2045 147,475.09
  EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBNI REA 10141/2021 15/08/2016 15/08/2044 147,475.09
  EXTREMOZ II IB 230 kV MG 230 kV EXTREMOZ II MG1 RN IB1 RB FT MG 230 kV EXTREMOZ II MG1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040 185,113.41
  EXTREMOZ II MC 230 kV CE 150/-75 Mvar EXTREMOZ II CE1 RN RB FT CE 150/-75 Mvar EXTREMOZ II CE1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040 249,030.67
  EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 284,637.91
  EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040 344,500.00
  EXTREMOZ II MG 230 kV EXTREMOZ II MG1 RN RB FT MG 230 kV EXTREMOZ II MG1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040 517,137.44
  EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBNI REA 3208/2011 6/1/2020 6/1/2049 821,908.80
  EXTREMOZ II EL 230 kV EXTREMOZ II LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBNI REA 3208/2011 6/1/2020 6/1/2049 821,908.80
  EXTREMOZ II CE 150/-75 Mvar EXTREMOZ II CE1 RN RB FT CE 150/-75 Mvar EXTREMOZ II CE1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040 4,843,060.74
  FLORESTA II MG 230 kV FLORESTA II MG1 PE RB FT MG 230 kV FLORESTA II MG1 PE 061/2001 IPCA RBNI REA 10264/2021 5/4/2019 4/4/2037 51,184.76
  FLORESTA II MG 230 kV FLORESTA II MG1 PE RB FT MG 230 kV FLORESTA II MG1 PE 061/2001 IPCA RBNI REA 10264/2021 5/4/2019 4/4/2050 54,465.08
  FLORESTA II IB 230 kV MG 230 kV FLORESTA II MG1 PE IB1 RB FT MG 230 kV FLORESTA II MG1 PE 061/2001 IPCA RBNI REA 10264/2021 5/4/2019 4/4/2048 104,196.36
  FLORESTA II EL 230 kV FLORESTA II LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE 061/2001 IPCA RBNI REA 10264/2021 5/4/2019 4/4/2047 147,475.09
  FLORESTA II EL 230 kV FLORESTA II LT 230 kV FLORESTA II /BOM NOME C-1 PE RB FT LT 230 kV FLORESTA II /BOM NOME C-1 PE 061/2001 IPCA RBNI REA 10264/2021 5/4/2019 4/4/2047 147,475.09
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBNIA REA 6043/2016     53,316.41
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBNIA REA 6043/2016     67,268.77
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR5 CE RBF FT TR 230/69 kV FORTALEZA TR5 CE 061/2001 IPCA RBNIA REA 6043/2016     282,425.64
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR5 CE RBF FT TR 230/69 kV FORTALEZA TR5 CE 061/2001 IPCA RBNIA REA 6043/2016     660,506.86
  FORTALEZA TR 230/69 kV FORTALEZA TR5 CE RBF FT TR 230/69 kV FORTALEZA TR5 CE 061/2001 IPCA RBNIA REA 6043/2016     1,385,837.04
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBNI REA 2244/2010 5/9/2014 4/9/2034 580.97
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2047 2,131.38
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02J1 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038 4,586.11
  FORTALEZA EL 69 kV FORTALEZA  TBM 02J5 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038 6,879.16
  FORTALEZA EL 69 kV FORTALEZA  MONDUBIM 02J6 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038 6,879.16
  FORTALEZA EL 69 kV FORTALEZA  MESSEJANA 02J2 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038 6,879.16
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J4 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038 6,879.16
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J3 DIT   061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2038 6,879.16
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RMEL REN 443/2011 16/12/2017 15/12/2045 6,991.31
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RMEL REN 443/2011 16/12/2017 15/12/2045 6,991.31
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RMEL REN 443/2011 16/12/2017 15/12/2045 6,991.31
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBNI REA 2040/2009 30/01/2013 29/01/2043 8,236.95
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBNI REA 2040/2009 30/01/2013 29/01/2043 8,236.95
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 8,236.95
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 8,236.95
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RCDM REA 2040/2009 8/3/2013 7/3/2043 8,262.33
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RCDM REA 2040/2009 8/3/2013 7/3/2043 8,262.33
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE 061/2001 IPCA RMEL REN 643/2014 5/9/2014 4/9/2028 8,577.34
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE 061/2001 IPCA RMEL REN 643/2014 5/9/2014 4/9/2028 8,577.34
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE 061/2001 IPCA RMEL REN 643/2014 12/9/2014 11/9/2028 8,586.13
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE 061/2001 IPCA RMEL REN 643/2014 12/9/2014 11/9/2028 8,586.13
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE 061/2001 IPCA RMEL REN 643/2014 12/9/2014 11/9/2028 8,586.13
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE 061/2001 IPCA RMEL REN 643/2014 19/09/2014 18/09/2028 8,594.92
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RMEL REN 443/2011 30/06/2016 29/06/2046 8,763.68
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RMEL REN 443/2011 30/06/2016 29/06/2046 8,763.68
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RMEL REN 443/2011 30/06/2016 29/06/2046 8,763.68
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RMEL REN 443/2011 1/7/2016 30/06/2046 8,764.35
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RMEL REN 443/2011 1/7/2016 30/06/2046 8,764.35
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RMEL REN 443/2011 1/7/2016 30/06/2046 8,764.35
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L1 DIT   061/2001 IPCA RCDM REA 2040/2009 2/11/2013 1/11/2043 10,910.55
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RMEL REN 643/2014 14/07/2014 13/07/2044 12,437.05
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RMEL REN 443/2011 1/8/2016 31/07/2046 13,429.52

 

68 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RMEL REN 443/2011 25/01/2016 24/01/2046 15,726.86
  FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RMEL REN 443/2011 25/01/2016 24/01/2046 15,726.86
  FORTALEZA IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 16,473.90
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J7 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 16,473.90
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L3 DIT   061/2001 IPCA RCDM REA 2040/2009 30/01/2013 29/01/2043 16,473.90
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2047 18,648.44
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RMEL REN 643/2014 31/08/2015 30/08/2045 21,481.38
  FORTALEZA EL 69 kV FORTALEZA  TBM 02J5 DIT   061/2001 IPCA RCDM REA 2040/2009 24/05/2013 23/05/2043 21,538.93
  FORTALEZA EL 69 kV FORTALEZA  MONDUBIM 02J6 DIT   061/2001 IPCA RCDM REA 2040/2009 6/9/2013 5/9/2043 21,721.84
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02J1 DIT   061/2001 IPCA RCDM REA 2040/2009 22/09/2013 21/09/2043 21,749.70
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L1 DIT   061/2001 IPCA RCDM REA 2040/2009 2/11/2013 1/11/2043 21,821.12
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J7 DIT   061/2001 IPCA RCDM REA 2040/2009 30/04/2014 29/04/2044 22,132.94
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J8 DIT   061/2001 IPCA RCDM REA 2040/2009 26/08/2013 25/08/2044 26,223.85
  FORTALEZA MC 69 kV TT 69/13,8 kV FORTALEZA TA1 CE DIT   061/2001 IPCA RCDM REA 2040/2009 3/1/2014 2/1/2045 26,492.13
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02N1 DIT   061/2001 IPCA RCDM REA 2040/2009 17/01/2014 16/01/2045 26,521.02
  FORTALEZA MC 69 kV TT 69/13,8 kV FORTALEZA TA2 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  FORTALEZA MC 69 kV TT 69/13,8 kV FORTALEZA TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  FORTALEZA IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB2 RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,975.55
  FORTALEZA IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB1 RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,975.55
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L3 DIT   061/2001 IPCA RCDM REA 2040/2009 8/3/2013 7/3/2044 29,583.03
  FORTALEZA EL 69 kV FORTALEZA  DISTRITO 02J9 DIT   061/2001 IPCA RCDM REA 2040/2009 6/12/2013 5/12/2044 30,230.53
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  FORTALEZA BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RMEL REN 443/2011 10/10/2016 9/10/2033 32,356.36
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L2 DIT   061/2001 IPCA RCDM REA 2040/2009 17/11/2013 16/11/2043 32,770.89
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L4 DIT   061/2001 IPCA RCDM REA 2040/2009 24/11/2013 23/11/2043 32,789.17
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L3 DIT   061/2001 IPCA RCDM REA 2040/2009 28/11/2013 27/11/2043 32,799.62
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBNI REA 2040/2009 16/03/2014 15/03/2044 33,081.82
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RMEL REN 443/2011 23/07/2016 22/07/2033 35,402.37
  FORTALEZA IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB2 RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,997.40
  FORTALEZA IB 13,8 kV MG 230 kV FORTALEZA MG1 CE IB1 RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,997.40
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBNI REA 2040/2009 24/04/2014 23/04/2044 40,682.14
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 2040/2009 24/04/2014 23/04/2044 40,682.14
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 2040/2009 24/04/2014 23/04/2044 40,682.14
  FORTALEZA IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  FORTALEZA MC 13,8 kV TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  FORTALEZA MC 13,8 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J3 DIT   061/2001 IPCA RCDM REA 2040/2009 30/04/2013 29/04/2044 51,960.67
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L1 DIT   061/2001 IPCA RCDM REA 2040/2009 3/1/2014 2/1/2045 52,984.26
  FORTALEZA RTB 230 kV 3,33 Mvar FORTALEZA RTR1 CE RB FT RTB 230 kV 3,33 Mvar FORTALEZA RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,763.78
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02N1 DIT   061/2001 IPCA RCDM REA 2040/2009 27/01/2014 26/01/2045 56,895.54
  FORTALEZA IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  FORTALEZA MC 13,8 kV RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE RBF FT RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  FORTALEZA MC 13,8 kV RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE RBF FT RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RMEL REN 643/2014 30/06/2015 29/06/2043 72,724.91
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC9 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC8 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC7 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC12 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC11 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  FORTALEZA MC 13,8 kV BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE RBF FT BC 13,8 kV 3,1 MVAr FORTALEZA BC10 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  FORTALEZA EL 69 kV FORTALEZA  TBM 02J5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  FORTALEZA EL 69 kV FORTALEZA  MONDUBIM 02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  FORTALEZA EL 69 kV FORTALEZA  MESSEJANA 02J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02N1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  FORTALEZA EL 69 kV FORTALEZA  DISTRITO 02J9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  FORTALEZA EL 69 kV FORTALEZA  TBM 02J5 DIT   061/2001 IPCA RCDM REA 2040/2009 24/05/2013 23/05/2044 81,825.38
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J4 DIT   061/2001 IPCA RCDM REA 2040/2009 1/6/2013 31/05/2044 81,877.37
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02J1 DIT   061/2001 IPCA RCDM REA 2040/2009 23/09/2013 22/09/2044 82,618.28
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L2 DIT   061/2001 IPCA RCDM REA 2040/2009 19/12/2013 18/12/2044 83,183.73
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT4 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05

 

69 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT2 CE RB FT RTL 230 kV 10 Mvar FORTALEZA RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  FORTALEZA MC 230 kV RTL 230 kV 10 Mvar FORTALEZA RT1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  FORTALEZA EL 69 kV FORTALEZA  TBM 02J5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  FORTALEZA EL 69 kV FORTALEZA  MONDUBIM 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  FORTALEZA EL 69 kV FORTALEZA  MESSEJANA 02J2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02N1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02J1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  FORTALEZA EL 69 kV FORTALEZA  DISTRITO 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  FORTALEZA EL 69 kV FORTALEZA  MESSEJANA 02J2 DIT   061/2001 IPCA RCDM REA 2040/2009 15/03/2014 14/03/2045 105,795.47
  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,338.74
  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,338.74
  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,338.74
  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,338.74
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBNI REA 2244/2010 5/9/2014 4/9/2046 117,196.71
  FORTALEZA IB 230 kV MG 230 kV FORTALEZA MG1 CE IB3 RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  FORTALEZA IB 230 kV MG 230 kV FORTALEZA MG1 CE IB2 RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  FORTALEZA IB 230 kV MG 230 kV FORTALEZA MG1 CE IB1 RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  FORTALEZA RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE RBF FT RTB 13,8 kV 5 Mvar FORTALEZA RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  FORTALEZA IB 69 kV MG 230 kV FORTALEZA MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  FORTALEZA MC 230 kV RTB 230 kV 10 Mvar FORTALEZA RT5 CE RB FT RTB 230 kV 10 Mvar FORTALEZA RT5 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,194.51
  FORTALEZA RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE RBF FT RTB 13,8 kV 10 Mvar FORTALEZA RT1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 149,497.60
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  FORTALEZA MC 230 kV CE 100/-70 MvAr FORTALEZA CE1 CE CE2 RB FT CE 100/-70 MvAr FORTALEZA CE1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 157,363.60
  FORTALEZA IB 230 kV MG 230 kV FORTALEZA MG1 CE IB1 RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 166,420.18
  FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT4 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT3 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT2 CE RB FT RTL 230 kV 10 Mvar FORTALEZA RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  FORTALEZA RTB 230 kV 10 Mvar FORTALEZA RT5 CE RB FT RTB 230 kV 10 Mvar FORTALEZA RT5 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  FORTALEZA MC 230 kV BC 230 kV 50,5 MVAr FORTALEZA BC1 CE RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 173,549.34
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  FORTALEZA MC 69 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  FORTALEZA BC 230 kV 50,5 MVAr FORTALEZA BC1 CE RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,444.63
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  FORTALEZA TT 69/13,8 kV FORTALEZA TA2 CE DIT   061/2001 IPCA RCDM REA 3578/2012 27/11/2016 26/11/2046 222,310.89
  FORTALEZA TT 69/13,8 kV FORTALEZA TA1 CE DIT   061/2001 IPCA RCDM REA 3578/2012 27/11/2016 26/11/2046 222,310.89
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  FORTALEZA MC 69 kV BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  FORTALEZA EL 69 kV FORTALEZA  TBM 02J5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  FORTALEZA EL 69 kV FORTALEZA  PARANGABA 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  FORTALEZA EL 69 kV FORTALEZA  MONDUBIM 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  FORTALEZA EL 69 kV FORTALEZA  MESSEJANA 02J2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02N1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  FORTALEZA EL 69 kV FORTALEZA  JABOTI 02J1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  FORTALEZA EL 69 kV FORTALEZA  DISTRITO 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  FORTALEZA EL 69 kV FORTALEZA  DISTR. II 02L3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  FORTALEZA EL 69 kV FORTALEZA  D. GOUVEIA 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  FORTALEZA EL 69 kV FORTALEZA  COLUNA 02L1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 235,326.42
  FORTALEZA RTB 230 kV 10 Mvar FORTALEZA RT5 CE RB FT RTB 230 kV 10 Mvar FORTALEZA RT5 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 235,326.42
  FORTALEZA MC 230 kV BC 230 kV 50,5 MVAr FORTALEZA BC1 CE RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 239,564.81
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBNI REA 3631/2012 27/08/2021 27/08/2046 269,849.76
  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC6 CE DIT   061/2001 IPCA RMEL REN 643/2014 19/09/2014 18/09/2040 269,867.29
  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC4 CE DIT   061/2001 IPCA RMEL REN 643/2014 19/09/2014 18/09/2040 269,867.29

 

70 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC3 CE DIT   061/2001 IPCA RMEL REN 643/2014 19/09/2014 18/09/2040 269,867.29
  FORTALEZA BC 69 kV 20,3 Mvar FORTALEZA BC5 CE DIT   061/2001 IPCA RMEL REN 643/2014 26/09/2014 25/09/2040 270,036.53
  FORTALEZA BC 230 kV 50,5 MVAr FORTALEZA BC1 CE RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,310.27
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 2837/2011 6/5/2021 5/5/2054 288,797.78
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV BANABUIU /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  FORTALEZA IB 230 kV MG 230 kV FORTALEZA MG1 CE IB1 RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 365,054.76
  FORTALEZA TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  FORTALEZA TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  FORTALEZA TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  FORTALEZA TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  FORTALEZA MC 230 kV TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  FORTALEZA TR 230/69 kV FORTALEZA TR4 CE RBF FT TR 230/69 kV FORTALEZA TR4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  FORTALEZA TR 230/69 kV FORTALEZA TR3 CE RBF FT TR 230/69 kV FORTALEZA TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  FORTALEZA TR 230/69 kV FORTALEZA TR2 CE RBF FT TR 230/69 kV FORTALEZA TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  FORTALEZA TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  FORTALEZA RTL 230 kV 10 Mvar FORTALEZA RT1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 516,205.60
  FORTALEZA MC 230 kV BC 230 kV 50,5 MVAr FORTALEZA BC1 CE RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 525,502.83
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBNI REA 2823/2011 2/10/2020 2/10/2049 534,005.59
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBNI REA 2823/2011 29/07/2019 28/07/2048 541,088.50
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBNI REA 2823/2011 2/10/2020 2/10/2049 541,088.50
  FORTALEZA BC 230 kV 50,5 MVAr FORTALEZA BC1 CE RB FT BC 230 kV 50,5 MVAr FORTALEZA BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 603,913.08
  FORTALEZA EL 230 kV FORTALEZA LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 795,969.18
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,098,743.48
  FORTALEZA TR 230/69 kV FORTALEZA TR1 CE RBF FT TR 230/69 kV FORTALEZA TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  FORTALEZA CE 100/-70 Mvar FORTALEZA CE2 CE RB FT CE 100/-70 MvAr FORTALEZA CE1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,345,108.16
  FORTALEZA CE 100/-70 MvAr FORTALEZA CE1 CE RB FT CE 100/-70 MvAr FORTALEZA CE1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,345,108.16
  FORTALEZA MG 230 kV FORTALEZA MG1 CE RB FT MG 230 kV FORTALEZA MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,410,173.68
  FORTALEZA CE 100/-70 Mvar FORTALEZA CE2 CE RB FT CE 100/-70 MvAr FORTALEZA CE1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,237,150.82
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RMEL REN 643/2014 2/7/2014 1/7/2044 19,692.58
  FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RMEL REN 443/2011 11/10/2016 10/10/2033 29,270.44
  FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT2 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 643/2014 17/10/2013 16/10/2048 30,930.40
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 7761/2019 31/12/2019 30/12/2034 41,040.04
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 7761/2019 31/12/2019 30/12/2034 41,040.04
  FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 643/2014 18/10/2013 17/10/2048 44,342.07
  FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 2376/2010 1/5/2012 30/04/2040 46,997.68
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RMEL REN 443/2011 9/6/2017 8/6/2048 50,357.22
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 53,328.81
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 53,328.81
  FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 53,328.81
  FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 54,677.09
  FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 54,677.09
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBNI REA 2244/2010 5/9/2014 4/9/2044 54,732.16
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBNI REA 2244/2010 5/9/2014 4/9/2044 54,732.16
  FORTALEZA II MC 500 kV RTB 500 kV 150 Mvar FORTALEZA II RT4 CE RB FT RTB 500 kV 150 Mvar FORTALEZA II RT4 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 55,640.16
  FORTALEZA II TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RMEL REN 643/2014 20/10/2013 19/10/2047 55,739.90
  FORTALEZA II TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RMEL REN 643/2014 13/10/2013 12/10/2047 74,283.12
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV MARACANAU /FORTALEZA II C-1 CE RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 6137/2016 3/2/2021 3/2/2048 76,250.44
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBNI REA 6137/2016 21/01/2021 21/01/2048 76,250.44
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBNI REA 6137/2016 3/2/2021 3/2/2048 76,250.44
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBNI REA 6137/2016 1/10/2021 1/10/2048 76,250.44
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 6137/2016 3/2/2021 3/2/2048 76,250.44
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 6137/2016 3/2/2021 3/2/2048 76,250.44
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-2 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE 061/2001 IPCA RBNI REA 6137/2016 20/01/2021 20/01/2048 76,250.44
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBNI REA 6137/2016 3/2/2021 3/2/2048 82,057.07
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBNI REA 6137/2016 3/2/2021 3/2/2048 82,057.07
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 6137/2016 1/10/2021 1/10/2051 91,255.28
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 106,657.59
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RMEL REN 443/2011 20/03/2016 19/03/2046 106,657.59
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR3 CE RB FT TR 500/230 kV FORTALEZA II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 6137/2016 1/10/2021 1/10/2053 198,986.81
  FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 5211/2015 7/5/2017 6/5/2045 209,056.51
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 220,807.62
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 220,807.62
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV MARACANAU /FORTALEZA II C-1 CE RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-2 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV CAUIPE /FORTALEZA II C-1 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  FORTALEZA II RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE RB FT RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,025.77
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV MARACANAU /FORTALEZA II C-1 CE RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82

 

71 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  FORTALEZA II RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE RB FT RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 392,064.76
  FORTALEZA II MC 500 kV RTB 500 kV 150 Mvar FORTALEZA II RT4 CE RB FT RTB 500 kV 150 Mvar FORTALEZA II RT4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,921.40
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 419,410.17
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR3 CE RB FT TR 500/230 kV FORTALEZA II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 484,357.56
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 484,357.56
  FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE IB2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 6137/2016 1/10/2021 1/10/2045 507,668.59
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  FORTALEZA II TR 500/230 kV FORTALEZA II TRR1 CE RB FT TR 500/230 kV FORTALEZA II TRR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 647,846.29
  FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV MARACANAU /FORTALEZA II C-1 CE RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  FORTALEZA II EL 230 kV FORTALEZA II LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT2 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 802,051.67
  FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 802,051.67
  FORTALEZA II RTB 500 kV 150 Mvar FORTALEZA II RT4 CE RB FT RTB 500 kV 150 Mvar FORTALEZA II RT4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 805,482.14
  FORTALEZA II RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE RB FT RTB 500 kV 60 MVAr FORTALEZA II RTR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 860,022.55
  FORTALEZA II TR 500/230 kV FORTALEZA II TRR1 CE RB FT TR 500/230 kV FORTALEZA II TRR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 894,276.94
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE BARRA2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 6137/2016 1/10/2021 1/10/2051 895,528.05
  FORTALEZA II IB 230 kV MG 500 kV FORTALEZA II MG1 CE BARRA1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBNI REA 6137/2016 1/10/2021 1/10/2051 895,528.05
  FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT2 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,107,139.65
  FORTALEZA II MC 230 kV TR 500/230 kV FORTALEZA II TR4 CE RB FT TR 500/230 kV FORTALEZA II TR4 CE 061/2001 IPCA RBNI REA 5211/2015 7/5/2017 6/5/2047 1,180,282.19
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,306,279.44
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,306,279.44
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB2 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  FORTALEZA II IB 500 kV MG 500 kV FORTALEZA II MG1 CE IB1 RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  FORTALEZA II EL 500 kV FORTALEZA II LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,480,048.26
  FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,772,971.55
  FORTALEZA II TR 500/230 kV FORTALEZA II TR3 CE RB FT TR 500/230 kV FORTALEZA II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  FORTALEZA II TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  FORTALEZA II TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  FORTALEZA II TR 500/230 kV FORTALEZA II TRR1 CE RB FT TR 500/230 kV FORTALEZA II TRR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,961,661.47
  FORTALEZA II MC 500 kV TR 500/230 kV FORTALEZA II TR4 CE RB FT TR 500/230 kV FORTALEZA II TR4 CE 061/2001 IPCA RBNI REA 5211/2015 7/5/2017 6/5/2048 2,140,389.13
  FORTALEZA II RTL 500 kV 148 MVAr FORTALEZA II RT2 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,428,591.30
  FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,447,382.35
  FORTALEZA II TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,682,830.82
  FORTALEZA II TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,682,830.82
  FORTALEZA II MG 500 kV FORTALEZA II MG1 CE RB FT MG 500 kV FORTALEZA II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,368,511.07
  FORTALEZA II TR 500/230 kV FORTALEZA II TR4 CE RB FT TR 500/230 kV FORTALEZA II TR4 CE 061/2001 IPCA RBNI REA 5211/2015 7/5/2017 6/5/2052 5,466,759.67
  FORTALEZA II TR 500/230 kV FORTALEZA II TR2 CE RB FT TR 500/230 kV FORTALEZA II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,884,984.41
  FORTALEZA II TR 500/230 kV FORTALEZA II TR1 CE RB FT TR 500/230 kV FORTALEZA II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,884,984.41
  FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITABUNA III C-1 BA RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBNI REA 5861/2016 9/6/2016 8/6/2044 9,880.56
  FUNIL EL 138 kV FUNIL  DIST4 DIT   061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044 15,694.83
  FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RMEL REN 443/2011 13/03/2016 12/3/2046 15,784.50
  FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RMEL REN 443/2011 13/03/2016 12/3/2046 15,784.50
  FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RMEL REN 443/2011 13/03/2016 12/3/2046 15,784.50
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RMEL REN 443/2011 1/5/2016 30/04/2046 15,843.33
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RMEL REN 443/2011 1/5/2016 30/04/2046 15,843.33
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RMEL REN 443/2011 1/5/2016 30/04/2046 15,843.33
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2029 18,391.07
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RMEL REN 643/2014 7/2/2014 6/2/2028 19,395.71
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RMEL REN 443/2011 25/03/2015 24/03/2038 21,167.09
  FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RMEL REN 443/2011 24/04/2016 23/04/2039 21,967.44
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  FUNIL BC 13,8 kV 3,1 Mvar FUNIL BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  FUNIL BC 13,8 kV 3,1 Mvar FUNIL BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RMEL REN 443/2011 26/02/2016 25/02/2033 31,478.25
  FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,948.27
  FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,948.27
  FUNIL RTB 230 kV 20 Mvar FUNIL RT1 BA RB FT RTB 230 kV 20 Mvar FUNIL RT1 BA 061/2001 IPCA RMEL REN 643/2014 12/2/2014 11/2/2049 33,961.09
  FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RMEL REN 443/2011 15/04/2016 14/04/2049 38,377.03
  FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 44,100.90
  FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 44,100.90
  FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RMEL REN 443/2011 30/06/2016 29/06/2044 51,135.60
  FUNIL EL 13,8 kV FUNIL  GER1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  FUNIL EL 13,8 kV FUNIL  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  FUNIL EL 13,8 kV FUNIL  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  FUNIL EL 13,8 kV FUNIL  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  FUNIL EL 13,8 kV FUNIL  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RMEL REN 643/2014 17/08/2014 16/08/2044 62,586.22

 

72 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 64,170.73
  FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 64,170.73
  FUNIL EL 13,8 kV FUNIL  GER1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 71,769.69
  FUNIL EL 13,8 kV FUNIL  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 71,769.69
  FUNIL EL 13,8 kV FUNIL  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 71,769.69
  FUNIL EL 13,8 kV FUNIL  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 71,769.69
  FUNIL EL 13,8 kV FUNIL  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 71,769.69
  FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 96,738.53
  FUNIL IB 13,8 kV MG 230 kV FUNIL MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 96,738.53
  FUNIL IB 138 kV MG 230 kV FUNIL MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 101,078.88
  FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  FUNIL RTB 230 kV 7,4 MVAr FUNIL RTR1 BA RB FT RTB 230 kV 7,4 MVAr FUNIL RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 106,656.51
  FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC2 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC2 BA 061/2001 IPCA RMEL REN 443/2011 15/04/2016 14/04/2049 112,484.62
  FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RMEL REN 643/2014 7/12/2015 6/12/2047 114,604.01
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 126,072.21
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 126,072.21
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 126,072.21
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 126,072.21
  FUNIL MC 138 kV TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 126,072.21
  FUNIL MC 138 kV TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 126,072.21
  FUNIL MC 115 kV TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 126,072.21
  FUNIL IB 230 kV MG 230 kV FUNIL MG1 BA IB1 RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 140,763.15
  FUNIL MC 13,8 kV TR 138/13,8 kV FUNIL TR9 BA MC1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 140,763.15
  FUNIL RTB 230 kV 7,4 MVAr FUNIL RTR1 BA RB FT RTB 230 kV 7,4 MVAr FUNIL RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 147,226.99
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBNI REA 2173/2009 24/01/2013 23/01/2041 153,666.56
  FUNIL EL 13,8 kV FUNIL  GER1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 157,432.03
  FUNIL EL 13,8 kV FUNIL  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 157,432.03
  FUNIL EL 13,8 kV FUNIL  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 157,432.03
  FUNIL EL 13,8 kV FUNIL  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 157,432.03
  FUNIL EL 13,8 kV FUNIL  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 157,432.03
  FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC2 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,196.02
  FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,196.02
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBNI REA 2173/2009 24/01/2013 23/01/2041 161,041.86
  FUNIL MC 230 kV RTB 230 kV 22,2 Mvar FUNIL RT2 BA RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 161,662.20
  FUNIL MC 230 kV RTB 230 kV 20 Mvar FUNIL RT1 BA RB FT RTB 230 kV 20 Mvar FUNIL RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 161,662.20
  FUNIL TR 138/13,8 kV FUNIL TRR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 161,681.54
  FUNIL TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 161,681.54
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 174,028.12
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 174,028.12
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 174,028.12
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 174,028.12
  FUNIL MC 138 kV TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 174,028.12
  FUNIL MC 138 kV TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 174,028.12
  FUNIL EL 138 kV FUNIL  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 184,126.49
  FUNIL EL 138 kV FUNIL  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 184,126.49
  FUNIL EL 138 kV FUNIL  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 184,126.49
  FUNIL EL 138 kV FUNIL  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 184,126.49
  FUNIL EL 138 kV FUNIL  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 184,126.49
  FUNIL EL 138 kV FUNIL  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 184,126.49
  FUNIL IB 230 kV MG 230 kV FUNIL MG1 BA IB1 RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  FUNIL BC 230 kV 50,5 MVAr FUNIL BC2 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,444.63
  FUNIL BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,444.63
  FUNIL TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 215,576.05
  FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 221,132.09
  FUNIL MC 230 kV RTB 230 kV 22,2 Mvar FUNIL RT2 BA RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 223,155.99
  FUNIL MC 230 kV RTB 230 kV 20 Mvar FUNIL RT1 BA RB FT RTB 230 kV 20 Mvar FUNIL RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 223,155.99
  FUNIL TR 138/13,8 kV FUNIL TRR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 223,182.68
  FUNIL TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 223,182.68
  FUNIL RTB 230 kV 20 Mvar FUNIL RT1 BA RB FT RTB 230 kV 20 Mvar FUNIL RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 225,193.73
  FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  FUNIL MC 13,8 kV BC 13,8 kV 3,1 Mvar FUNIL BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITABUNA III C-1 BA RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  FUNIL EL 138 kV FUNIL  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 254,165.34
  FUNIL EL 138 kV FUNIL  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 254,165.34
  FUNIL BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,310.27
  FUNIL TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 297,577.82
  FUNIL RTB 230 kV 22,2 Mvar FUNIL RT2 BA RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 319,969.53
  FUNIL RTB 230 kV 7,4 MVAr FUNIL RTR1 BA RB FT RTB 230 kV 7,4 MVAr FUNIL RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 322,953.10
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  FUNIL EL 230 kV FUNIL LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10

 

73 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITABUNA III C-1 BA RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 381,743.32
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 381,743.32
  FUNIL MC 138 kV TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 381,743.32
  FUNIL MC 138 kV TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 381,743.32
  FUNIL TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,942.44
  FUNIL TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,942.44
  FUNIL TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,942.44
  FUNIL IB 230 kV MG 230 kV FUNIL MG1 BA IB1 RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 419,410.17
  FUNIL RTB 230 kV 22,2 Mvar FUNIL RT2 BA RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 441,680.96
  FUNIL MC 230 kV BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 485,069.32
  FUNIL MC 230 kV RTB 230 kV 22,2 Mvar FUNIL RT2 BA RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 489,508.88
  FUNIL MC 230 kV RTB 230 kV 20 Mvar FUNIL RT1 BA RB FT RTB 230 kV 20 Mvar FUNIL RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 489,508.88
  FUNIL TR 138/13,8 kV FUNIL TRR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 489,567.43
  FUNIL TR 138/13,8 kV FUNIL TR9 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 489,567.43
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  FUNIL MC 230 kV TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  FUNIL TR 230/138 kV FUNIL TR6 BA RBF FT TR 230/138 kV FUNIL TR6 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 532,748.94
  FUNIL TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 532,748.94
  FUNIL TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 532,748.94
  FUNIL EL 138 kV FUNIL  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 557,530.14
  FUNIL BC 230 kV 50,5 MVAr FUNIL BC1 BA RB FT BC 230 kV 50,5 MVAr FUNIL BC1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 603,913.08
  FUNIL TR 138/115 kV FUNIL TR7 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 652,758.59
  FUNIL EL 230 kV FUNIL LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  FUNIL EL 230 kV FUNIL LT 230 kV FUNIL /ITABUNA III C-1 BA RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 827,304.02
  FUNIL RTB 230 kV 22,2 Mvar FUNIL RT2 BA RB FT RTB 230 kV 22,2 Mvar FUNIL RT2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 968,859.29
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,141,997.60
  FUNIL TR 230/138 kV FUNIL TR2 BA RBF FT TR 230/138 kV FUNIL TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,168,623.52
  FUNIL TR 230/138 kV FUNIL TR1 BA RBF FT TR 230/138 kV FUNIL TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,168,623.52
  FUNIL TR 230/138 kV FUNIL TR3 BA RBF FT TR 230/138 kV FUNIL TR3 BA 061/2001 IPCA RBNI REA 2173/2009 24/01/2013 23/01/2047 1,443,757.97
  FUNIL MG 230 kV FUNIL MG1 BA RB FT MG 230 kV FUNIL MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,505,054.76
  FUNIL CE 200/-100 MvAr FUNIL CE1 BA RB FT CE 200/-100 MvAr FUNIL CE1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,489,833.68
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST1 DIT   061/2001 IPCA RMEL REN 443/2011 7/7/2016 6/7/2046 237.26
  G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RMEL REN 443/2011 15/02/2016 14/02/2046 241.09
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST6 DIT   061/2001 IPCA RMEL REN 443/2011 7/7/2016 6/7/2046 1,644.83
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST3 DIT   061/2001 IPCA RMEL REN 443/2011 7/7/2016 6/7/2046 1,644.83
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST2 DIT   061/2001 IPCA RMEL REN 443/2011 7/7/2016 6/7/2046 1,644.83
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV P.DO CAVALO /G.MANGABEIRA C-1 BA DIT   061/2001 IPCA RMEL REN 443/2011 28/02/2016 27/02/2046 13,880.30
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV P.DO CAVALO /G.MANGABEIRA C-1 BA DIT   061/2001 IPCA RMEL REN 443/2011 28/02/2016 27/02/2046 13,880.30
  G.MANGABEIRA MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RMEL REN 443/2011 19/06/2016 18/06/2046 15,902.16
  G.MANGABEIRA MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RMEL REN 443/2011 19/06/2016 18/06/2046 15,902.16
  G.MANGABEIRA MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RMEL REN 443/2011 19/06/2016 18/06/2046 15,902.16
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RMEL REN 443/2011 15/07/2016 14/07/2046 16,198.44
  G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035 24,137.24
  G.MANGABEIRA MC 69 kV TT 69/13,8 kV G.MANGABEIRA TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  G.MANGABEIRA MC 69 kV TT 69/0 kV G.MANGABEIRA TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC6 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC5 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC4 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC3 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC2 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  G.MANGABEIRA BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC1 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RMEL REN 643/2014 2/2/2014 1/2/2042 38,531.03
  G.MANGABEIRA IB 69 kV MG 230 kV G.MANGABEIRA MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  G.MANGABEIRA MC 13,8 kV TR 230/69 kV G.MANGABEIRA TR1 BA MC2 RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  G.MANGABEIRA MC 13,8 kV TR 230/69 kV G.MANGABEIRA TR1 BA MC1 RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  G.MANGABEIRA MC 69 kV TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC6 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC6 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC5 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC4 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC3 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC2 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  G.MANGABEIRA MC 13,8 kV BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC1 BA RBF FT BC 13,8 kV 3,6 MVAr G.MANGABEIRA BC1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  G.MANGABEIRA EL 69 kV G.MANGABEIRA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2042 80,481.72
  G.MANGABEIRA TT 69/13,8 kV G.MANGABEIRA TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  G.MANGABEIRA TT 69/0 kV G.MANGABEIRA TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RMEL REN 443/2011 18/03/2016 17/03/2049 109,601.14
  G.MANGABEIRA IB 230 kV MG 230 kV G.MANGABEIRA MG1 BA IB1 RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  G.MANGABEIRA RTS 13,8 kV 5 Mvar G.MANGABEIRA RT1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  G.MANGABEIRA MC 230 kV TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  G.MANGABEIRA RTS 13,8 kV 5 Mvar G.MANGABEIRA RT1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV TOMBA /G.MANGABEIRA C-2 BA RB FT LT 230 kV TOMBA /G.MANGABEIRA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV TOMBA /G.MANGABEIRA C-1 BA RB FT LT 230 kV TOMBA /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV P.DO CAVALO /G.MANGABEIRA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88

 

74 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBNI REA 2823/2011 18/05/2015 17/05/2043 256,238.98
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  G.MANGABEIRA TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  G.MANGABEIRA RTS 13,8 kV 5 Mvar G.MANGABEIRA RT1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 395,132.42
  G.MANGABEIRA MC 69 kV TR 230/69 kV G.MANGABEIRA TR2 BA RBF FT TR 230/69 kV G.MANGABEIRA TR2 BA 061/2001 IPCA RBNI REA 2823/2011 18/05/2015 17/05/2045 462,398.79
  G.MANGABEIRA TR 230/69 kV G.MANGABEIRA TR1 BA RBF FT TR 230/69 kV G.MANGABEIRA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 617,486.78
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 852,369.15
  G.MANGABEIRA MC 230 kV TR 230/69 kV G.MANGABEIRA TR2 BA RBF FT TR 230/69 kV G.MANGABEIRA TR2 BA 061/2001 IPCA RBNI REA 2823/2011 18/05/2015 17/05/2046 1,082,346.71
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV CATU /G.MANGABEIRA C-1 BA RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2045 1,254,361.17
  G.MANGABEIRA EL 230 kV G.MANGABEIRA LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2045 1,254,361.17
  G.MANGABEIRA TR 230/69 kV G.MANGABEIRA TR2 BA RBF FT TR 230/69 kV G.MANGABEIRA TR2 BA 061/2001 IPCA RBNI REA 2823/2011 18/05/2015 17/05/2049 1,451,144.40
  G.MANGABEIRA MG 230 kV G.MANGABEIRA MG1 BA RB FT MG 230 kV G.MANGABEIRA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,869,733.69
  GARANHUNS II RTL 500 kV 50 Mvar GARANHUNS II RTR1 PE RB FT RTL 500 kV 50 Mvar GARANHUNS II RTR1 PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2051 77,705.92
  GARANHUNS II MC 500 kV RTL 500 kV 150 Mvar GARANHUNS II RT1 PE RB FT RTL 500 kV 150 Mvar GARANHUNS II RT1 PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2041 85,950.82
  GARANHUNS II EL 230 kV GARANHUNS II LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2043 147,475.09
  GARANHUNS II EL 230 kV GARANHUNS II LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2043 147,475.09
  GARANHUNS II EL 230 kV GARANHUNS II LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2043 147,475.09
  GARANHUNS II EL 230 kV GARANHUNS II LT 230 kV GARANHUNS II /ANGELIM C-3 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2043 147,475.09
  GARANHUNS II EL 230 kV GARANHUNS II LT 230 kV GARANHUNS II /ANGELIM C-2 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-2 PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2043 147,475.09
  GARANHUNS II EL 500 kV GARANHUNS II LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2043 184,015.06
  GARANHUNS II EL 500 kV GARANHUNS II LT 500 kV GARANHUNS II /ANGELIM II C-1 PE RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2043 184,015.06
  GARANHUNS II RTL 500 kV 150 Mvar GARANHUNS II RT1 PE RB FT RTL 500 kV 150 Mvar GARANHUNS II RT1 PE 061/2001 IPCA RBNI REA 10140/2021 18/11/2015 18/11/2051 233,117.72
  GOIANINHA EL 69 kV GOIANINHA  DIST3 DIT   061/2001 IPCA RMEL REN 443/2011 1/10/2015 30/09/2045 982.87
  GOIANINHA EL 69 kV GOIANINHA  DIST1 DIT   061/2001 IPCA RMEL REN 643/2014 12/11/2015 11/11/2045 3,304.34
  GOIANINHA EL 69 kV GOIANINHA  DIST4 DIT   061/2001 IPCA RMEL REN 443/2011 1/10/2015 30/09/2045 3,326.95
  GOIANINHA EL 69 kV GOIANINHA  DIST7 DIT   061/2001 IPCA RMEL REN 643/2014 29/09/2015 28/09/2045 3,353.71
  GOIANINHA EL 69 kV GOIANINHA  DIST1 DIT   061/2001 IPCA RMEL REN 643/2014 29/09/2015 28/09/2045 3,353.71
  GOIANINHA EL 69 kV GOIANINHA  DIST3 DIT   061/2001 IPCA RMEL REN 643/2014 30/09/2015 29/09/2045 3,353.97
  GOIANINHA EL 69 kV GOIANINHA  DIST2 DIT   061/2001 IPCA RMEL REN 643/2014 30/09/2015 29/09/2045 3,353.97
  GOIANINHA EL 69 kV GOIANINHA  DIST9 DIT   061/2001 IPCA RMEL REN 643/2014 18/03/2015 17/03/2045 3,424.68
  GOIANINHA EL 69 kV GOIANINHA  DIST8 DIT   061/2001 IPCA RMEL REN 643/2014 18/03/2015 17/03/2045 3,424.68
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RMEL REN 643/2014 28/09/2015 27/09/2045 6,706.91
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2046 13,849.64
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2046 13,849.64
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2046 13,849.64
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2049 17,542.52
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 25,946.62
  GOIANINHA IB 13,8 kV MG 230 kV GOIANINHA MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 26,002.84
  GOIANINHA MC 69 kV TT 69/0 kV GOIANINHA TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  GOIANINHA IB 69 kV MG 230 kV GOIANINHA MG1 PE IB3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 29,883.46
  GOIANINHA IB 69 kV MG 230 kV GOIANINHA MG1 PE IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 29,883.46
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 32,197.76
  GOIANINHA MC 13,8 kV RTS 13,8 kV 5 Mvar GOIANINHA RT2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,914.78
  GOIANINHA MC 13,8 kV RTS 13,8 kV 5 Mvar GOIANINHA RT1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,914.78
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBNI REN 905/2020 11/3/2019 10/3/2050 39,279.98
  GOIANINHA MC 69 kV BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RMEL REN 643/2014 30/06/2014 29/06/2046 41,032.54
  GOIANINHA IB 69 kV MG 230 kV GOIANINHA MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2039 44,939.61
  GOIANINHA MC 13,8 kV TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  GOIANINHA MC 13,8 kV TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  GOIANINHA IB 69 kV MG 230 kV GOIANINHA MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  GOIANINHA MC 13,8 kV CS 20/-9 MVAr GOIANINHA CS1 PE MC2 RBF FT CS 20/-9 MVAr GOIANINHA CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,856.97
  GOIANINHA MC 13,8 kV CS 20/-9 MVAr GOIANINHA CS1 PE MC1 RBF FT CS 20/-9 MVAr GOIANINHA CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,856.97
  GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR3 PE RBF FT TR 230/69 kV GOIANINHA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2050 66,405.49
  GOIANINHA MC 69 kV BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  GOIANINHA EL 69 kV GOIANINHA  DIST9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  GOIANINHA EL 69 kV GOIANINHA  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  GOIANINHA EL 69 kV GOIANINHA  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  GOIANINHA EL 69 kV GOIANINHA  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  GOIANINHA EL 69 kV GOIANINHA  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  GOIANINHA EL 69 kV GOIANINHA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  GOIANINHA EL 69 kV GOIANINHA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  GOIANINHA EL 69 kV GOIANINHA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  GOIANINHA EL 69 kV GOIANINHA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  GOIANINHA MC 69 kV BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  GOIANINHA EL 69 kV GOIANINHA  DIST9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  GOIANINHA EL 69 kV GOIANINHA  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  GOIANINHA EL 69 kV GOIANINHA  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  GOIANINHA EL 69 kV GOIANINHA  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  GOIANINHA EL 69 kV GOIANINHA  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  GOIANINHA EL 69 kV GOIANINHA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  GOIANINHA EL 69 kV GOIANINHA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  GOIANINHA BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,014.30
  GOIANINHA IB 230 kV MG 230 kV GOIANINHA MG1 PE IB1 RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  GOIANINHA RTS 13,8 kV 5 Mvar GOIANINHA RT2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  GOIANINHA RTS 13,8 kV 5 Mvar GOIANINHA RT1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  GOIANINHA MC 230 kV RTB 230 kV 10 MVAr GOIANINHA RT1 PE RB FT RTB 230 kV 10 MVAr GOIANINHA RT1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,194.51
  GOIANINHA MC 230 kV TR 230/69 kV GOIANINHA TR3 PE RBF FT TR 230/69 kV GOIANINHA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14

 

75 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  GOIANINHA MC 230 kV TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  GOIANINHA MC 230 kV TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  GOIANINHA BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 160,144.34
  GOIANINHA IB 230 kV MG 230 kV GOIANINHA MG1 PE IB1 RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 166,420.18
  GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  GOIANINHA RTB 230 kV 10 MVAr GOIANINHA RT1 PE RB FT RTB 230 kV 10 MVAr GOIANINHA RT1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,855.62
  GOIANINHA MC 230 kV RTB 230 kV 10 MVAr GOIANINHA RT1 PE RB FT RTB 230 kV 10 MVAr GOIANINHA RT1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 201,804.63
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV RECIFE II /GOIANINHA C-2 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB RB FT LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  GOIANINHA MC 69 kV BC 69 kV 21,3 Mvar GOIANINHA BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  GOIANINHA TT 69/0 kV GOIANINHA TA1 PE DIT   061/2001 IPCA RCDM REA 5931/2016 1/8/2018 1/8/2048 227,857.05
  GOIANINHA EL 69 kV GOIANINHA  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  GOIANINHA EL 69 kV GOIANINHA  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  GOIANINHA EL 69 kV GOIANINHA  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  GOIANINHA EL 69 kV GOIANINHA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  GOIANINHA EL 69 kV GOIANINHA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  GOIANINHA TT 69/0 kV GOIANINHA TA2 PE DIT   061/2001 IPCA RCDM REA 2412/2010 14/08/2012 13/08/2042 276,547.04
  GOIANINHA MC 69 kV TT 69/0 kV GOIANINHA TA2 PE DIT   061/2001 IPCA RCDM REA 2412/2010 14/08/2012 13/08/2043 297,792.72
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  GOIANINHA IB 230 kV MG 230 kV GOIANINHA MG1 PE IB1 RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 365,054.76
  GOIANINHA TR 230/69 kV GOIANINHA TR3 PE RBF FT TR 230/69 kV GOIANINHA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  GOIANINHA TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  GOIANINHA TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RMEL REN 643/2014 13/12/2015 12/12/2047 445,205.00
  GOIANINHA EL 69 kV GOIANINHA  DIST10 DIT   061/2001 IPCA RCDM REN 905/2020 11/3/2019 10/3/2046 475,257.49
  GOIANINHA TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  GOIANINHA TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  GOIANINHA MC 230 kV TR 230/69 kV GOIANINHA TR4 PE RBF FT TR 230/69 kV GOIANINHA TR4 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2041 642,085.90
  GOIANINHA EL 230 kV GOIANINHA LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 680,334.08
  GOIANINHA CS 20/-9 MVAr GOIANINHA CS1 PE RBF FT CS 20/-9 MVAr GOIANINHA CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 798,670.52
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 939,122.57
  GOIANINHA TR 230/69 kV GOIANINHA TR2 PE RBF FT TR 230/69 kV GOIANINHA TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  GOIANINHA TR 230/69 kV GOIANINHA TR1 PE RBF FT TR 230/69 kV GOIANINHA TR1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  GOIANINHA MC 69 kV TR 230/69 kV GOIANINHA TR4 PE RBF FT TR 230/69 kV GOIANINHA TR4 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2040 1,152,754.38
  GOIANINHA TR 230/69 kV GOIANINHA TR4 PE RBF FT TR 230/69 kV GOIANINHA TR4 PE 061/2001 IPCA RBNI REA 5931/2016 15/04/2018 15/04/2052 1,378,647.16
  GOIANINHA MG 230 kV GOIANINHA MG1 PE RB FT MG 230 kV GOIANINHA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,060,033.63
  IBIAPINA II MG 230 kV IBIAPINA II MG1 CE RB FT MG 230 kV IBIAPINA II MG1 CE 010/2011 IPCA RBNI REN 905/2020 21/10/2021 20/10/2052 35,346.87
  IBIAPINA II MG 230 kV IBIAPINA II MG1 CE RB FT MG 230 kV IBIAPINA II MG1 CE 010/2011 IPCA RBNI REN 905/2020 21/10/2021 20/10/2052 35,346.87
  IBIAPINA II MC 69 kV TT 69/69 kV IBIAPINA II TA1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/9/2016 13/10/2041 62,494.28
  IBIAPINA II MG 69 kV IBIAPINA II MG1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/9/2016 13/10/2041 64,173.23
  IBIAPINA II IB 69 kV MG 69 kV IBIAPINA II MG1 CE IB1 ICG   010/2011 IPCA RICG CC 010/2011 12/9/2016 13/10/2041 101,517.32
  IBIAPINA II EL 230 kV IBIAPINA II LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE RB FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE 061/2001 IPCA RBNI REA 10142/2021 10/2/2021 10/2/2049 147,475.09
  IBIAPINA II EL 230 kV IBIAPINA II LT 230 kV IBIAPINA II /SOBRAL II C-1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBNI REA 10142/2021 10/2/2021 10/2/2050 147,475.09
  IBIAPINA II MC 69 kV TR 230/69 kV IBIAPINA II TR2 CE ICG   010/2011 IPCA RICG CC 010/2011 12/9/2016 13/10/2041 148,075.92
  IBIAPINA II MC 69 kV TR 230/69 kV IBIAPINA II TR1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/9/2016 13/10/2041 148,075.92
  IBIAPINA II TT 69/69 kV IBIAPINA II TA1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/9/2016 13/10/2041 167,875.34
  IBIAPINA II MC 69 kV BC 69 kV 23 Mvar IBIAPINA II BC1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/9/2016 13/10/2041 179,183.14
  IBIAPINA II BC 69 kV 23 Mvar IBIAPINA II BC1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/9/2016 13/10/2041 262,517.21
  IBIAPINA II IB 230 kV MG 230 kV IBIAPINA II MG1 CE IB1 RB FT MG 230 kV IBIAPINA II MG1 CE 010/2011 IPCA RBL CC 010/2011 12/9/2016 13/10/2041 292,919.64
  IBIAPINA II MC 230 kV TR 230/69 kV IBIAPINA II TR2 CE ICG   010/2011 IPCA RICG CC 010/2011 12/9/2016 13/10/2041 364,047.09
  IBIAPINA II MC 230 kV TR 230/69 kV IBIAPINA II TR1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/9/2016 13/10/2041 364,047.09
  IBIAPINA II EL 69 kV IBIAPINA II  DIST2 DIT   010/2011 IPCA RCDM REN 905/2020 21/10/2021 20/10/2049 459,361.81
  IBIAPINA II EL 69 kV IBIAPINA II  DIST1 DIT   010/2011 IPCA RCDM REN 905/2020 21/10/2021 20/10/2049 459,361.81
  IBIAPINA II MG 230 kV IBIAPINA II MG1 CE RB FT MG 230 kV IBIAPINA II MG1 CE 010/2011 IPCA RBL CC 010/2011 12/9/2016 13/10/2041 829,373.62
  IBIAPINA II TR 230/69 kV IBIAPINA II TR2 CE ICG   010/2011 IPCA RICG CC 010/2011 12/9/2016 13/10/2041 835,060.92
  IBIAPINA II TR 230/69 kV IBIAPINA II TR1 CE ICG   010/2011 IPCA RICG CC 010/2011 12/9/2016 13/10/2041 835,060.92
  IBICOARA MG 500 kV IBICOARA MG4 BA RB FT MG 500 kV IBICOARA MG4 BA 061/2001 IPCA RMEL REN 443/2011 28/10/2016 27/10/2031 1,173.76
  IBICOARA EL 138 kV IBICOARA  DIST1 DIT   010/2007 IPCA RMEL REN 643/2014 27/09/2014 26/09/2044 1,821.21
  IBICOARA MC 500 kV TR 500/230 kV IBICOARA TR1 BA RB FT TR 500/230 kV IBICOARA TR1 BA 010/2007 IPCA RMEL REN 443/2011 20/12/2015 19/12/2045 19,458.11
  IBICOARA MC 500 kV TR 500/230 kV IBICOARA TR1 BA RB FT TR 500/230 kV IBICOARA TR1 BA 010/2007 IPCA RBNI REA 5861/2016 25/05/2018 24/05/2046 31,219.81
  IBICOARA MG 500 kV IBICOARA MG4 BA RB FT MG 500 kV IBICOARA MG4 BA 061/2001 IPCA RBNI REA 7761/2019 30/09/2015 29/09/2030 35,697.58
  IBICOARA MG 500 kV IBICOARA MG4 BA RB FT MG 500 kV IBICOARA MG4 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2013 19/12/2047 60,713.42
  IBICOARA IB 138 kV MG 500 kV IBICOARA MG2 BA IB1 DIT   010/2007 IPCA RPEC CC 010/2007 11/6/2007 11/6/2037 106,056.65
  IBICOARA MG 500 kV IBICOARA MG2 BA RB FT MG 500 kV IBICOARA MG2 BA 010/2007 IPCA RBNI REA 5211/2015 10/6/2019 9/6/2048 130,999.55
  IBICOARA MC 138 kV TR 230/138 kV IBICOARA TR3 BA RBF FT TR 230/138 kV IBICOARA TR3 BA 010/2007 IPCA RBL CC 010/2007 11/6/2007 11/6/2037 196,534.97
  IBICOARA MC 138 kV TR 230/138 kV IBICOARA TR2 BA RBF FT TR 230/138 kV IBICOARA TR2 BA 010/2007 IPCA RBL CC 010/2007 11/6/2007 11/6/2037 196,534.97
  IBICOARA IB 230 kV MG 500 kV IBICOARA MG2 BA IB1 RB FT MG 500 kV IBICOARA MG2 BA 010/2007 IPCA RBL CC 010/2007 11/6/2007 11/6/2037 229,633.46
  IBICOARA TR 230/138 kV IBICOARA TR3 BA RBF FT TR 230/138 kV IBICOARA TR3 BA 010/2007 IPCA RBL CC 010/2007 11/6/2007 11/6/2037 318,714.80
  IBICOARA TR 230/138 kV IBICOARA TR2 BA RBF FT TR 230/138 kV IBICOARA TR2 BA 010/2007 IPCA RBL CC 010/2007 11/6/2007 11/6/2037 318,714.80
  IBICOARA IB 500 kV MG 500 kV IBICOARA MG2 BA IB3 RB FT MG 500 kV IBICOARA MG2 BA 010/2007 IPCA RBL CC 010/2007 11/6/2007 11/6/2037 377,435.86
  IBICOARA MC 230 kV TR 500/230 kV IBICOARA TR1 BA RB FT TR 500/230 kV IBICOARA TR1 BA 010/2007 IPCA RBL CC 010/2007 11/6/2007 11/6/2037 401,224.49
  IBICOARA MC 230 kV TR 230/138 kV IBICOARA TR3 BA RBF FT TR 230/138 kV IBICOARA TR3 BA 010/2007 IPCA RBL CC 010/2007 11/6/2007 11/6/2037 401,224.49
  IBICOARA MC 230 kV TR 230/138 kV IBICOARA TR2 BA RBF FT TR 230/138 kV IBICOARA TR2 BA 010/2007 IPCA RBL CC 010/2007 11/6/2007 11/6/2037 401,224.49
  IBICOARA EL 230 kV IBICOARA LT 230 kV BRUMADO II /IBICOARA C-1 BA RB FT LT 230 kV BRUMADO II /IBICOARA C-1 BA 010/2007 IPCA RBL CC 010/2007 11/6/2007 11/6/2037 462,436.30
  IBICOARA TR 500/230 kV IBICOARA TRR1 BA RB FT TR 500/230 kV IBICOARA TRR1 BA 010/2007 IPCA RBL CC 010/2007 11/6/2007 11/6/2037 614,636.19
  IBICOARA EL 138 kV IBICOARA  DIST2 DIT   010/2007 IPCA RCDM REA 1523/2008 24/02/2011 23/02/2033 757,545.98
  IBICOARA EL 138 kV IBICOARA  DIST1 DIT   010/2007 IPCA RCDM REA 1523/2008 24/02/2011 23/02/2033 757,545.98
  IBICOARA MC 500 kV TR 500/230 kV IBICOARA TR1 BA RB FT TR 500/230 kV IBICOARA TR1 BA 010/2007 IPCA RBL CC 010/2007 11/6/2007 11/6/2037 952,538.37
  IBICOARA MC 230 kV TR 500/230 kV IBICOARA TR3 BA RB FT TR 500/230 kV IBICOARA TR3 BA 010/2007 IPCA RBNI REA 5211/2015 10/6/2019 9/6/2050 1,245,737.52
  IBICOARA TR 500/230 kV IBICOARA TR1 BA RB FT TR 500/230 kV IBICOARA TR1 BA 010/2007 IPCA RBL CC 010/2007 11/6/2007 11/6/2037 1,843,908.58

 

76 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  IBICOARA MC 500 kV TR 500/230 kV IBICOARA TR3 BA RB FT TR 500/230 kV IBICOARA TR3 BA 010/2007 IPCA RBNI REA 5211/2015 10/6/2019 9/6/2051 2,068,421.57
  IBICOARA TR 500/230 kV IBICOARA TR3 BA RB FT TR 500/230 kV IBICOARA TR3 BA 010/2007 IPCA RBNI REA 5211/2015 10/6/2019 9/6/2053 3,992,172.13
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBNI REA 8314/2019 8/6/2018 7/6/2033 7,915.87
  ICO EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RMEL REN 643/2014 20/07/2014 19/07/2044 20,816.32
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBNI REA 7761/2019 31/08/2015 30/08/2030 24,740.99
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RMEL REN 643/2014 5/2/2014 4/2/2031 26,404.18
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RMEL REN 643/2014 21/06/2013 20/06/2030 27,687.27
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/09/2016 28/09/2033 32,313.81
  ICO IB 69 kV MG 230 kV ICO MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBNI REA 1814/2009 20/01/2013 19/01/2041 46,501.54
  ICO IB 69 kV MG 230 kV ICO MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  ICO MC 69 kV TR 230/69 kV ICO TR2 CE RBF FT TR 230/69 kV ICO TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ICO MC 69 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ICO EL 69 kV ICO  S.M.DO OES.02J8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ICO EL 69 kV ICO  S.M.DO OES.02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ICO EL 69 kV ICO  OROS 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ICO EL 69 kV ICO  IGUATU 02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ICO EL 69 kV ICO  CEDRO 02J9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ICO MC 69 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  ICO EL 69 kV ICO  S.M.DO OES.02J8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ICO EL 69 kV ICO  OROS 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ICO EL 69 kV ICO  IGUATU 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ICO EL 69 kV ICO  CEDRO 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ICO IB 230 kV MG 230 kV ICO MG1 CE IB1 RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  ICO IB 69 kV MG 230 kV ICO MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  ICO MC 230 kV TR 230/69 kV ICO TR2 CE RBF FT TR 230/69 kV ICO TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  ICO MC 230 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  ICO MC 69 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  ICO MC 230 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  ICO EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  ICO EL 230 kV ICO LT 230 kV BANABUIU /ICO C-1 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  ICO TT 69/13,8 kV ICO TA1 CE DIT   061/2001 IPCA RCDM REA 3578/2012 18/02/2017 17/02/2047 223,506.55
  ICO EL 69 kV ICO  S.M.DO OES.02J8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ICO EL 69 kV ICO  OROS 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ICO EL 69 kV ICO  IGUATU 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ICO EL 69 kV ICO  CEDRO 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ICO EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  ICO TR 230/69 kV ICO TR2 CE RBF FT TR 230/69 kV ICO TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  ICO TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  ICO EL 69 kV ICO  ICO II 02J5 DIT   061/2001 IPCA RCDM REA 1814/2009 29/01/2013 28/01/2043 440,741.55
  ICO MC 230 kV TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 483,549.99
  ICO TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 667,484.89
  ICO EL 230 kV ICO LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  ICO TR 230/69 kV ICO TR1 CE RBF FT TR 230/69 kV ICO TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  ICO MG 230 kV ICO MG1 CE RB FT MG 230 kV ICO MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,464,176.62
  IGAPORA II MG 230 kV IGAPORA II MG1 BA RB FT MG 230 kV IGAPORA II MG1 BA 020/2010 IPCA RBNI REA 7761/2019 31/10/2015 30/10/2030 28,996.75
  IGAPORA II MC 69 kV TT 69/0 kV IGAPORA II TT1 BA ICG   020/2010 IPCA RICG CC 020/2010 2/6/2014 23/11/2040 42,243.03
  IGAPORA II MG 69 kV IGAPORA II MG1 BA ICG   020/2010 IPCA RICG CC 020/2010 2/6/2014 23/11/2040 42,539.84
  IGAPORA II TT 69/0 kV IGAPORA II TT1 BA ICG   020/2010 IPCA RICG CC 020/2010 2/6/2014 23/11/2040 54,616.81
  IGAPORA II IB 69 kV MG 69 kV IGAPORA II MG1 BA IB1 ICG   020/2010 IPCA RICG CC 020/2010 2/6/2014 23/11/2040 67,536.36
  IGAPORA II MG 69 kV IGAPORA II MG1 BA ICG   020/2010 IPCA RICGNI REN 643/2014 8/7/2016 7/7/2049 73,008.79
  IGAPORA II MC 69 kV TR 230/69 kV IGAPORA II TR2 BA ICG   020/2010 IPCA RICG CC 020/2010 2/6/2014 23/11/2040 99,044.17
  IGAPORA II MC 69 kV TR 230/69 kV IGAPORA II TR1 BA ICG   020/2010 IPCA RICG CC 020/2010 2/6/2014 23/11/2040 99,044.17
  IGAPORA II MC 69 kV BC 69 kV 21 Mvar IGAPORA II BC2 BA ICG   020/2010 IPCA RICG CC 020/2010 2/6/2014 23/11/2040 120,270.54
  IGAPORA II MC 69 kV BC 69 kV 21 Mvar IGAPORA II BC1 BA ICG   020/2010 IPCA RICG CC 020/2010 2/6/2014 23/11/2040 120,270.54
  IGAPORA II IB 230 kV MG 230 kV IGAPORA II MG1 BA IB1 RB FT MG 230 kV IGAPORA II MG1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040 155,570.76
  IGAPORA II MG 69 kV IGAPORA II MG1 BA ICG   020/2010 IPCA RICGNI REA 4316/2013 4/7/2016 30/06/2032 163,206.96
  IGAPORA II BC 69 kV 21 Mvar IGAPORA II BC2 BA ICG   020/2010 IPCA RICG CC 020/2010 2/6/2014 23/11/2040 170,748.04
  IGAPORA II BC 69 kV 21 Mvar IGAPORA II BC1 BA ICG   020/2010 IPCA RICG CC 020/2010 2/6/2014 23/11/2040 170,748.04
  IGAPORA II MC 230 kV BC 230 kV 50 Mvar IGAPORA II BC1 BA RB FT BC 230 kV 50 Mvar IGAPORA II BC1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040 233,628.35
  IGAPORA II MC 230 kV TR 230/69 kV IGAPORA II TR2 BA ICG   020/2010 IPCA RICG CC 020/2010 2/6/2014 23/11/2040 243,433.09
  IGAPORA II MC 230 kV TR 230/69 kV IGAPORA II TR1 BA ICG   020/2010 IPCA RICG CC 020/2010 2/6/2014 23/11/2040 243,433.09
  IGAPORA II BC 230 kV 50 Mvar IGAPORA II BC1 BA RB FT BC 230 kV 50 Mvar IGAPORA II BC1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040 244,362.13
  IGAPORA II EL 230 kV IGAPORA II LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA RB FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040 289,520.51
  IGAPORA II MC 69 kV TR 230/69 kV IGAPORA II TR3 BA ICG   020/2010 IPCA RICGNI REA 4316/2013 4/7/2016 30/06/2032 397,674.06
  IGAPORA II EL 69 kV IGAPORA II  GUANAMBI DIT   020/2010 IPCA RCDM REN 443/2011 8/7/2016 7/7/2039 426,955.36
  IGAPORA II EL 69 kV IGAPORA II  CAETITE DIT   020/2010 IPCA RCDM REN 443/2011 8/7/2016 7/7/2039 426,955.36
  IGAPORA II MG 230 kV IGAPORA II MG1 BA RB FT MG 230 kV IGAPORA II MG1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040 439,441.80
  IGAPORA II EL 230 kV IGAPORA II LT 230 kV IGAPORA II /IGAPORA III C-2 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 569,845.64
  IGAPORA II EL 230 kV IGAPORA II LT 230 kV IGAPORA II /IGAPORA III C-1 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 569,845.64
  IGAPORA II TR 230/69 kV IGAPORA II TR2 BA ICG   020/2010 IPCA RICG CC 020/2010 2/6/2014 23/11/2040 767,765.22
  IGAPORA II TR 230/69 kV IGAPORA II TR1 BA ICG   020/2010 IPCA RICG CC 020/2010 2/6/2014 23/11/2040 767,765.22
  IGAPORA II MC 230 kV TR 230/69 kV IGAPORA II TR3 BA ICG   020/2010 IPCA RICGNI REA 4316/2013 4/7/2016 30/06/2032 1,077,535.66
  IGAPORA II TR 230/69 kV IGAPORA II TR3 BA ICG   020/2010 IPCA RICGNI REA 4316/2013 4/7/2016 30/06/2032 1,684,092.00
  IGAPORA III MG 500 kV IGAPORA III MG1 BA RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBNI REA 7761/2019 30/04/2019 29/04/2034 21,444.06
  IGAPORA III MG 500 kV IGAPORA III MG1 BA RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035 24,971.33
  IGAPORA III MG 500 kV IGAPORA III MG1 BA RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBNI REA 5211/2015 12/3/2019 11/3/2048 130,851.72
  IGAPORA III IB 230 kV MG 500 kV IGAPORA III MG1 BA IB1 RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 352,219.62
  IGAPORA III MC 230 kV TR 500/230 kV IGAPORA III TR2 BA RB FT TR 500/230 kV IGAPORA III TR2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 404,591.53
  IGAPORA III MC 230 kV TR 500/230 kV IGAPORA III TR1 BA RB FT TR 500/230 kV IGAPORA III TR1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 404,591.53
  IGAPORA III EL 230 kV IGAPORA III LT 230 kV IGAPORA III /PINDAI II C-1 BA RB FT LT 230 kV IGAPORA III /PINDAI II C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 569,845.64
  IGAPORA III EL 230 kV IGAPORA III LT 230 kV IGAPORA II /IGAPORA III C-2 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 569,845.64
  IGAPORA III EL 230 kV IGAPORA III LT 230 kV IGAPORA II /IGAPORA III C-1 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 569,845.64
  IGAPORA III MG 500 kV IGAPORA III MG1 BA RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBNI REA 4493/2014 3/9/2018 2/9/2047 618,715.63

 

77 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  IGAPORA III RTB 500 kV 50 Mvar IGAPORA III RTBR1 BA RB FT RTB 500 kV 50 Mvar IGAPORA III RTBR1 BA 019/2012 IPCA RBNI REA 4493/2014 9/8/2018 8/8/2053 648,520.21
  IGAPORA III MC 500 kV TR 500/230 kV IGAPORA III TR2 BA RB FT TR 500/230 kV IGAPORA III TR2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 1,101,082.47
  IGAPORA III MC 500 kV TR 500/230 kV IGAPORA III TR1 BA RB FT TR 500/230 kV IGAPORA III TR1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 1,101,082.47
  IGAPORA III IB 500 kV MG 500 kV IGAPORA III MG1 BA IB3 RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 1,174,900.06
  IGAPORA III IB 500 kV MG 500 kV IGAPORA III MG1 BA IB2 RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 1,174,900.06
  IGAPORA III IB 500 kV MG 500 kV IGAPORA III MG1 BA IB1 RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 1,174,900.06
  IGAPORA III MC 500 kV TR 500/230 kV IGAPORA III TR3 BA RB FT TR 500/230 kV IGAPORA III TR3 BA 019/2012 IPCA RBNI REA 4493/2014 7/8/2018 6/8/2049 1,211,761.98
  IGAPORA III MC 230 kV TR 500/230 kV IGAPORA III TR4 BA RB FT TR 500/230 kV IGAPORA III TR4 BA 019/2012 IPCA RBNI REA 5211/2015 12/3/2019 11/3/2050 1,212,789.54
  IGAPORA III MC 500 kV RTB 500 kV 150 Mvar IGAPORA III RTB1 BA RB FT RTB 500 kV 150 Mvar IGAPORA III RTB1 BA 019/2012 IPCA RBNI REA 4493/2014 9/8/2018 8/8/2050 1,505,177.32
  IGAPORA III TR 500/230 kV IGAPORA III TRR1 BA RB FT TR 500/230 kV IGAPORA III TRR1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 1,753,865.50
  IGAPORA III IB 500 kV MG 500 kV IGAPORA III MG1 BA IB4 RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBNI REA 4493/2014 3/9/2018 2/9/2050 1,839,766.81
  IGAPORA III MC 500 kV TR 500/230 kV IGAPORA III TR4 BA RB FT TR 500/230 kV IGAPORA III TR4 BA 019/2012 IPCA RBNI REA 5211/2015 12/3/2019 11/3/2051 1,921,569.16
  IGAPORA III MC 500 kV TR 500/230 kV IGAPORA III TR3 BA RB FT TR 500/230 kV IGAPORA III TR3 BA 019/2012 IPCA RBNI REA 4493/2014 7/8/2018 6/8/2050 1,921,569.16
  IGAPORA III RTB 500 kV 150 Mvar IGAPORA III RTB1 BA RB FT RTB 500 kV 150 Mvar IGAPORA III RTB1 BA 019/2012 IPCA RBNI REA 4493/2014 9/8/2018 8/8/2053 2,127,690.95
  IGAPORA III MG 500 kV IGAPORA III MG1 BA RB FT MG 500 kV IGAPORA III MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 2,720,982.79
  IGAPORA III TR 500/230 kV IGAPORA III TR2 BA RB FT TR 500/230 kV IGAPORA III TR2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 5,261,594.56
  IGAPORA III TR 500/230 kV IGAPORA III TR1 BA RB FT TR 500/230 kV IGAPORA III TR1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 5,261,594.56
  IGAPORA III TR 500/230 kV IGAPORA III TR4 BA RB FT TR 500/230 kV IGAPORA III TR4 BA 019/2012 IPCA RBNI REA 5211/2015 12/3/2019 11/3/2054 5,705,341.50
  IGAPORA III TR 500/230 kV IGAPORA III TR3 BA RB FT TR 500/230 kV IGAPORA III TR3 BA 019/2012 IPCA RBNI REA 4493/2014 7/8/2018 6/8/2053 5,705,341.50
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RMEL REN 443/2011 12/7/2016 11/7/2046 3,395.34
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RMEL REN 643/2014 10/2/2014 9/2/2031 26,422.04
  IRECE MC 69 kV TT 69/13,8 kV IRECE TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  IRECE TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RMEL REN 443/2011 20/08/2017 19/08/2051 27,810.73
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RMEL REN 643/2014 4/12/2015 3/12/2032 34,411.05
  IRECE IB 69 kV MG 230 kV IRECE MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  IRECE MC 13,8 kV TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  IRECE MC 13,8 kV TR 230/13,8 kV IRECE TR7 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RMEL REN 643/2014 28/02/2015 27/02/2043 49,136.26
  IRECE IB 69 kV MG 230 kV IRECE MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  IRECE MC 13,8 kV CS 30/-15 MVAr IRECE CS1 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,856.97
  IRECE MC 13,8 kV TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 64,170.73
  IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT2 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT1 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  IRECE MC 69 kV TR 230/69 kV IRECE TR3 BA RBF FT TR 230/69 kV IRECE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  IRECE MC 69 kV TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  IRECE MC 69 kV TR 230/69 kV IRECE TR1 BA RBF FT TR 230/69 kV IRECE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  IRECE EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RMEL REN 443/2011 22/04/2017 21/04/2047 67,385.35
  IRECE EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2047 67,390.27
  IRECE MC 230 kV TR 230/69 kV IRECE TR1 BA RBF FT TR 230/69 kV IRECE TR1 BA 061/2001 IPCA RMEL REN 443/2011 16/07/2017 15/07/2047 67,802.04
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RMEL REN 643/2014 31/10/2015 30/10/2043 73,463.25
  IRECE EL 69 kV IRECE  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  IRECE EL 69 kV IRECE  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  IRECE EL 69 kV IRECE  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  IRECE EL 69 kV IRECE  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  IRECE RTL 230 kV 5 Mvar IRECE RTR1 BA RB FT RTL 230 kV 5 Mvar IRECE RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,160.76
  IRECE MC 13,8 kV CS 30/-15 MVAr IRECE CS1 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 86,766.78
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBNI REA 3965/2013 19/12/2019 19/12/2053 89,130.26
  IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT2 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 89,933.61
  IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT1 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 89,933.61
  IRECE MC 69 kV TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  IRECE IB 138 kV MG 230 kV IRECE MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,365.85
  IRECE TT 69/13,8 kV IRECE TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  IRECE MC 230 kV RTL 230 kV 15 MVAr IRECE RT1 BA RB FT RTL 230 kV 15 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBNI REA 3965/2013 19/12/2019 19/12/2053 113,167.96
  IRECE RTL 230 kV 5 Mvar IRECE RTR1 BA RB FT RTL 230 kV 5 Mvar IRECE RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 113,413.43
  IRECE MC 138 kV TR 230/138 kV IRECE TR5 BA RBF FT TR 230/138 kV IRECE TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  IRECE MC 138 kV TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBNI REA 2376/2010 23/08/2015 22/08/2043 128,006.93
  IRECE RTS 13,8 kV 0 Mvar IRECE RLCC BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  IRECE RTB 13,8 kV 5 MVAr IRECE RT2 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  IRECE RTB 13,8 kV 5 MVAr IRECE RT1 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  IRECE MC 230 kV RTL 230 kV 15 MVAr IRECE RT1 BA RB FT RTL 230 kV 15 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 131,974.49
  IRECE IB 230 kV MG 230 kV IRECE MG1 BA IB1 RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  IRECE MC 230 kV TR 230/13,8 kV IRECE TR7 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  IRECE MC 230 kV TR 230/69 kV IRECE TR3 BA RBF FT TR 230/69 kV IRECE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  IRECE MC 230 kV TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  IRECE MC 230 kV TR 230/69 kV IRECE TR1 BA RBF FT TR 230/69 kV IRECE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  IRECE MC 230 kV TR 230/138 kV IRECE TR5 BA RBF FT TR 230/138 kV IRECE TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  IRECE MC 230 kV TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  IRECE TR 69/69 kV IRECE TREG3 BA RBF FT TR 230/69 kV IRECE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,845.55
  IRECE TR 69/69 kV IRECE TREG2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,845.55
  IRECE EL 138 kV IRECE  AGUAS BELAS DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  IRECE RTB 13,8 kV 5 MVAr IRECE RT2 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  IRECE RTB 13,8 kV 5 MVAr IRECE RT1 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  IRECE MC 13,8 kV CS 30/-15 MVAr IRECE CS1 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 190,329.23
  IRECE IB 230 kV MG 230 kV IRECE MG1 BA IB1 RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT2 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,275.92
  IRECE MC 13,8 kV RTB 13,8 kV 5 MVAr IRECE RT1 BA RBF FT RTB 13,8 kV 5 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,275.92
  IRECE TR 230/69 kV IRECE TR1 BA RBF FT TR 230/69 kV IRECE TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 217,696.01
  IRECE TR 230/69 kV IRECE TR3 BA RBF FT TR 230/69 kV IRECE TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,450.72
  IRECE TR 230/69 kV IRECE TR2 BA RBF FT TR 230/69 kV IRECE TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,450.72
  IRECE TR 230/13,8 kV IRECE TR7 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,729.78
  IRECE MC 230 kV TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  IRECE EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  IRECE EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  IRECE EL 138 kV IRECE  AGUAS BELAS DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 240,745.16

 

78 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  IRECE RTL 230 kV 15 MVAr IRECE RT1 BA RB FT RTL 230 kV 15 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 246,482.27
  IRECE MC 69 kV TR 230/69 kV IRECE TR6 BA RBF FT TR 230/69 kV IRECE TR6 BA 061/2001 IPCA RBNI REA 3965/2013 11/10/2019 11/10/2042 275,706.56
  IRECE TR 230/138 kV IRECE TR5 BA RBF FT TR 230/138 kV IRECE TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,678.64
  IRECE TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,678.64
  IRECE MC 230 kV RTL 230 kV 15 MVAr IRECE RT1 BA RB FT RTL 230 kV 15 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 289,495.64
  IRECE TR 230/138 kV IRECE TRR1 BA RBF FT TR 230/138 kV IRECE TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 300,271.40
  IRECE TR 230/69 kV IRECE TR1 BA RBF FT TR 230/69 kV IRECE TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 300,504.19
  IRECE CR 230 kV 81 MVAr IRECE BC1 BA RB FT CR 230 kV 81 MVAr IRECE BC1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 301,398.73
  IRECE TR 230/13,8 kV IRECE TR7 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 306,072.34
  IRECE EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  IRECE EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  IRECE RTL 230 kV 15 MVAr IRECE RT1 BA RB FT RTL 230 kV 15 MVAr IRECE RT1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 340,240.29
  IRECE TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 394,346.36
  IRECE TR 230/138 kV IRECE TRR1 BA RBF FT TR 230/138 kV IRECE TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 414,489.97
  IRECE IB 230 kV MG 230 kV IRECE MG1 BA IB1 RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 419,410.17
  IRECE EL 230 kV IRECE LT 230 kV MORRO CHAPEU II /IRECE C-1 BA RB FT LT 230 kV MORRO CHAPEU II /IRECE C-1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041 492,375.07
  IRECE MC 138 kV TR 230/138 kV IRECE TR8 BA RBF FT TR 230/138 kV IRECE TR8 BA 061/2001 IPCA RBNI REA 3965/2013 19/12/2019 19/12/2041 500,547.25
  IRECE MC 230 kV TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 663,115.11
  IRECE TR 230/13,8 kV IRECE TR7 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 671,391.92
  IRECE MC 230 kV TR 230/69 kV IRECE TR6 BA RBF FT TR 230/69 kV IRECE TR6 BA 061/2001 IPCA RBNI REA 3965/2013 11/10/2019 11/10/2043 695,175.23
  IRECE MC 230 kV TR 230/138 kV IRECE TR8 BA RBF FT TR 230/138 kV IRECE TR8 BA 061/2001 IPCA RBNI REA 3965/2013 19/12/2019 19/12/2043 695,175.23
  IRECE EL 230 kV IRECE LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  IRECE EL 230 kV IRECE LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  IRECE CS 30/-15 MVAr IRECE CS1 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 853,970.28
  IRECE TR 230/69 kV IRECE TR6 BA RBF FT TR 230/69 kV IRECE TR6 BA 061/2001 IPCA RBNI REA 3965/2013 11/10/2019 11/10/2054 855,091.07
  IRECE TR 230/138 kV IRECE TR4 BA RBF FT TR 230/138 kV IRECE TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 865,027.40
  IRECE TR 230/138 kV IRECE TRR1 BA RBF FT TR 230/138 kV IRECE TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 909,213.88
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 915,353.78
  IRECE EL 138 kV IRECE  BAIXIOS 03N2 DIT   061/2001 IPCA RCDM REA 2376/2010 23/08/2015 22/08/2045 951,914.88
  IRECE CS 30/-15 MVAr IRECE CS1 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,178,807.29
  IRECE TR 230/138 kV IRECE TR8 BA RBF FT TR 230/138 kV IRECE TR8 BA 061/2001 IPCA RBNI REA 3965/2013 19/12/2019 19/12/2054 1,455,628.19
  IRECE MG 230 kV IRECE MG1 BA RB FT MG 230 kV IRECE MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,007,895.05
  IRECE CS 30/-15 MVAr IRECE CS1 BA RB FT CS 30/-15 MVAr IRECE CS1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,585,799.48
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 443/2011 11/1/2016 10/1/2046 3,031.76
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 443/2011 11/1/2016 10/1/2046 3,031.77
  ITABAIANA EL 69 kV ITABAIANA  DIST2 DIT   061/2001 IPCA RMEL REN 643/2014 22/01/2015 21/01/2045 12,296.46
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RMEL REN 443/2011 20/08/2017 19/08/2045 16,005.13
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RMEL REN 643/2014 21/04/2014 20/04/2044 19,581.44
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 21,201.94
  ITABAIANA EL 69 kV ITABAIANA  DIST1 DIT   061/2001 IPCA RMEL REN 643/2014 9/2/2014 8/2/2044 23,935.09
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 443/2011 15/09/2016 14/09/2033 32,259.65
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 643/2014 6/12/2015 5/12/2032 34,419.59
  ITABAIANA MC 69 kV TR 230/69 kV ITABAIANA TR1 SE RBF FT TR 230/69 kV ITABAIANA TR1 SE 061/2001 IPCA RMEL REN 643/2014 7/12/2014 6/12/2044 36,758.57
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBNI REN 905/2020 18/09/2017 17/09/2048 38,587.46
  ITABAIANA IB 69 kV MG 230 kV ITABAIANA MG1 SE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBNI REA 1814/2009 21/08/2015 20/08/2043 58,339.82
  ITABAIANA MC 69 kV TR 230/69 kV ITABAIANA TR2 SE RBF FT TR 230/69 kV ITABAIANA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ITABAIANA MC 69 kV TR 230/69 kV ITABAIANA TR1 SE RBF FT TR 230/69 kV ITABAIANA TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ITABAIANA EL 69 kV ITABAIANA  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ITABAIANA EL 69 kV ITABAIANA  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ITABAIANA EL 69 kV ITABAIANA  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ITABAIANA EL 69 kV ITABAIANA  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ITABAIANA EL 69 kV ITABAIANA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ITABAIANA EL 69 kV ITABAIANA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ITABAIANA EL 69 kV ITABAIANA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ITABAIANA EL 69 kV ITABAIANA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RMEL REN 643/2014 30/04/2014 29/04/2042 80,667.80
  ITABAIANA TT 69/13,8 kV ITABAIANA TA1 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  ITABAIANA EL 69 kV ITABAIANA  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ITABAIANA EL 69 kV ITABAIANA  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ITABAIANA EL 69 kV ITABAIANA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ITABAIANA EL 69 kV ITABAIANA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ITABAIANA EL 69 kV ITABAIANA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2031 115,676.92
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2031 115,676.92
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2031 115,676.92
  ITABAIANA MC 230 kV TR 230/69 kV ITABAIANA TR2 SE RBF FT TR 230/69 kV ITABAIANA TR2 SE 061/2001 IPCA RMEL REN 443/2011 24/11/2017 23/11/2049 120,411.85
  ITABAIANA IB 230 kV MG 230 kV ITABAIANA MG1 SE IB1 RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  ITABAIANA TT 69/13,8 kV ITABAIANA TA1 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  ITABAIANA MC 230 kV TR 230/69 kV ITABAIANA TR2 SE RBF FT TR 230/69 kV ITABAIANA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  ITABAIANA MC 230 kV TR 230/69 kV ITABAIANA TR1 SE RBF FT TR 230/69 kV ITABAIANA TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  ITABAIANA TT 69/13,8 kV ITABAIANA TA2 SE DIT   061/2001 IPCA RCDM REA 2837/2011 20/03/2016 19/03/2046 204,785.62
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  ITABAIANA EL 230 kV ITABAIANA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  ITABAIANA EL 69 kV ITABAIANA  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ITABAIANA EL 69 kV ITABAIANA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ITABAIANA EL 69 kV ITABAIANA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ITABAIANA EL 69 kV ITABAIANA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ITABAIANA MC 69 kV TR 230/69 kV ITABAIANA TR3 SE RBF FT TR 230/69 kV ITABAIANA TR3 SE 061/2001 IPCA RBNI REA 2823/2011 22/06/2020 22/06/2054 240,905.49

 

79 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  ITABAIANA TT 69/13,8 kV ITABAIANA TA1 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  ITABAIANA TR 230/69 kV ITABAIANA TR2 SE RBF FT TR 230/69 kV ITABAIANA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  ITABAIANA TR 230/69 kV ITABAIANA TR1 SE RBF FT TR 230/69 kV ITABAIANA TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  ITABAIANA EL 69 kV ITABAIANA  DIST9 DIT   061/2001 IPCA RCDM REN 905/2020 18/09/2017 17/09/2044 465,894.28
  ITABAIANA MC 230 kV TR 230/69 kV ITABAIANA TR3 SE RBF FT TR 230/69 kV ITABAIANA TR3 SE 061/2001 IPCA RBNI REA 2823/2011 22/06/2020 22/06/2054 501,110.13
  ITABAIANA TR 230/69 kV ITABAIANA TR2 SE RBF FT TR 230/69 kV ITABAIANA TR2 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  ITABAIANA TR 230/69 kV ITABAIANA TR1 SE RBF FT TR 230/69 kV ITABAIANA TR1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 608,275.37
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 839,653.85
  ITABAIANA MG 230 kV ITABAIANA MG1 SE RB FT MG 230 kV ITABAIANA MG1 SE 061/2001 IPCA RBNI REA 2823/2011 22/06/2020 22/06/2054 1,130,711.46
  ITABAIANA TR 230/69 kV ITABAIANA TR3 SE RBF FT TR 230/69 kV ITABAIANA TR3 SE 061/2001 IPCA RBNI REA 2823/2011 22/06/2020 22/06/2060 1,380,356.49
  ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR2 SE RBF FT TR 230/69 kV ITABAIANINHA TR2 SE 061/2001 IPCA RMEL REN 643/2014 8/3/2014 7/3/2044 20,597.36
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 25,946.62
  ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  ITABAIANINHA TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RMEL REN 643/2014 5/12/2015 4/12/2032 31,157.16
  ITABAIANINHA TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBNI REA 2837/2011 6/3/2015 5/3/2043 56,954.34
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBNI REA 2376/2010 22/03/2015 21/03/2043 57,020.52
  ITABAIANINHA MC 69 kV TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ITABAIANINHA MC 69 kV TR 230/69 kV ITABAIANINHA TR2 SE RBF FT TR 230/69 kV ITABAIANINHA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ITABAIANINHA MC 69 kV TR 230/69 kV ITABAIANINHA TR1 SE RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RMEL REN 643/2014 31/08/2015 30/08/2043 73,097.07
  ITABAIANINHA EL 69 kV ITABAIANINHA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ITABAIANINHA EL 69 kV ITABAIANINHA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ITABAIANINHA TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  ITABAIANINHA MC 69 kV TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  ITABAIANINHA MC 69 kV TR 230/69 kV ITABAIANINHA TR1 SE RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  ITABAIANINHA TT 69/13,8 kV ITABAIANINHA TA1 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RMEL REN 643/2014 7/2/2014 6/2/2028 93,490.63
  ITABAIANINHA IB 230 kV MG 230 kV ITABAIANINHA MG1 SE IB1 RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBNI REA 5212/2015 3/12/2017 2/12/2050 105,115.22
  ITABAIANINHA EL 69 kV ITABAIANINHA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ITABAIANINHA EL 69 kV ITABAIANINHA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2031 115,676.92
  ITABAIANINHA IB 230 kV MG 230 kV ITABAIANINHA MG1 SE IB1 RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  ITABAIANINHA TT 69/13,8 kV ITABAIANINHA TA1 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR2 SE RBF FT TR 230/69 kV ITABAIANINHA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR1 SE RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  ITABAIANINHA MC 69 kV TR 69/13,8 kV ITABAIANINHA TR5 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  ITABAIANINHA MC 69 kV TR 230/69 kV ITABAIANINHA TR1 SE RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBNI REA 4271/2013 10/8/2015 9/8/2043 200,161.56
  ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR1 SE RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBNI REA 5212/2015 3/12/2017 2/12/2045 211,998.47
  ITABAIANINHA TR 230/69 kV ITABAIANINHA TR2 SE RBF FT TR 230/69 kV ITABAIANINHA TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 217,696.01
  ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  ITABAIANINHA EL 69 kV ITABAIANINHA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ITABAIANINHA EL 69 kV ITABAIANINHA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  ITABAIANINHA TT 69/13,8 kV ITABAIANINHA TA1 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  ITABAIANINHA IB 69 kV MG 230 kV ITABAIANINHA MG1 SE IB1 DIT   061/2001 IPCA RCDM REA 2460/2010 2/11/2012 1/11/2043 289,040.49
  ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  ITABAIANINHA BC 230 kV 0 Mvar ITABAIANINHA BC1 SE RB FT BC 230 kV 50 Mvar ITABAIANINHA BC1 SE 061/2001 IPCA RBNI REA 5212/2015 3/12/2017 2/12/2040 421,646.55
  ITABAIANINHA MC 69 kV TR 230/69 kV ITABAIANINHA TR3 SE RBF FT TR 230/69 kV ITABAIANINHA TR3 SE 061/2001 IPCA RBNI REA 4271/2013 10/8/2015 9/8/2045 436,588.81
  ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR1 SE RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  ITABAIANINHA EL 69 kV ITABAIANINHA  ITAB. 04M4 DIT   061/2001 IPCA RCDM REA 2376/2010 22/03/2015 21/03/2045 464,839.54
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 483,266.22
  ITABAIANINHA EL 69 kV ITABAIANINHA  ARAUA 04M2 DIT   061/2001 IPCA RCDM REA 2837/2011 6/3/2015 5/3/2045 489,078.13
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 667,093.17
  ITABAIANINHA EL 230 kV ITABAIANINHA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  ITABAIANINHA MC 230 kV TR 230/69 kV ITABAIANINHA TR3 SE RBF FT TR 230/69 kV ITABAIANINHA TR3 SE 061/2001 IPCA RBNI REA 4271/2013 10/8/2015 9/8/2045 1,117,254.04
  ITABAIANINHA MC 230 kV BC 230 kV 0 Mvar ITABAIANINHA BC1 SE RB FT BC 230 kV 50 Mvar ITABAIANINHA BC1 SE 061/2001 IPCA RBNI REA 5212/2015 3/12/2017 2/12/2047 1,248,393.08
  ITABAIANINHA TR 230/69 kV ITABAIANINHA TR3 SE RBF FT TR 230/69 kV ITABAIANINHA TR3 SE 061/2001 IPCA RBNI REA 4271/2013 10/8/2015 9/8/2049 1,432,230.16
  ITABAIANINHA MG 230 kV ITABAIANINHA MG1 SE RB FT MG 230 kV ITABAIANINHA MG1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,463,317.36
  ITABAIANINHA TR 230/69 kV ITABAIANINHA TR1 SE RBF FT TR 230/69 kV ITABAIANINHA TR1 SE 061/2001 IPCA RBNI REA 4423/2013 12/9/2016 11/9/2050 1,561,822.93
  ITABUNA III MG 230 kV ITABUNA III MG2 BA RB FT MG 230 kV ITABUNA III MG2 BA 061/2001 IPCA RBNI DSP 1270/2022 1/7/2022 30/06/2053 38,732.30
  ITABUNA III EL 230 kV ITABUNA III LT 230 kV ITABUNA III /ITAPEBI C-1 BA RB FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA 061/2001 IPCA RBNI DSP 1270/2022 1/7/2022 30/06/2051 196,013.94
  ITABUNA III EL 230 kV ITABUNA III LT 230 kV FUNIL /ITABUNA III C-1 BA RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBNI DSP 1270/2022 1/7/2022 30/06/2051 196,013.94
  ITAPEBI MG 230 kV ITAPEBI MG1 BA RB FT MG 230 kV ITAPEBI MG1 BA 061/2001 IPCA RMEL REN 443/2011 27/04/2016 26/04/2031 4,646.83
  ITAPEBI EL 230 kV ITAPEBI LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBNI REA 5861/2016 5/3/2014 4/3/2042 8,089.17
  ITAPEBI EL 230 kV ITAPEBI LT 230 kV ITABUNA III /ITAPEBI C-1 BA RB FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA 061/2001 IPCA RBNI REA 5861/2016 9/6/2016 8/6/2044 9,880.56
  ITAPEBI IB 230 kV MG 230 kV ITAPEBI MG1 BA IB1 RB FT MG 230 kV ITAPEBI MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  ITAPEBI EL 230 kV ITAPEBI LT 230 kV ITAPEBI /VERACEL C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  ITAPEBI EL 230 kV ITAPEBI LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  ITAPEBI EL 230 kV ITAPEBI LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  ITAPEBI EL 230 kV ITAPEBI LT 230 kV ITABUNA III /ITAPEBI C-1 BA RB FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  ITAPEBI EL 230 kV ITAPEBI LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  ITAPEBI MG 230 kV ITAPEBI MG1 BA RB FT MG 230 kV ITAPEBI MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 453,431.01
  JABOATAO II TT 69/0 kV JABOATAO II TT1 PE DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 1/6/2042 64,133.35
  JABOATAO II MC 69 kV TT 69/0 kV JABOATAO II TT1 PE DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 1/6/2042 66,693.13
  JABOATAO II IB 69 kV MG 230 kV JABOATAO II MG1 PE IB1 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 1/6/2042 107,416.19
  JABOATAO II EL 230 kV JABOATAO II LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBNI REA 10092/2021 11/3/2021 11/3/2049 147,475.09
  JABOATAO II EL 230 kV JABOATAO II LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RBNI REA 10092/2021 11/3/2021 11/3/2049 147,475.09
  JABOATAO II EL 69 kV JABOATAO II  DIST5 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 1/6/2042 184,190.99
  JABOATAO II EL 69 kV JABOATAO II  DIST4 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 1/6/2042 184,190.99
  JABOATAO II EL 69 kV JABOATAO II  DIST3 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 1/6/2042 184,190.99
  JABOATAO II EL 69 kV JABOATAO II  DIST2 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 1/6/2042 184,190.99

 

80 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  JABOATAO II EL 69 kV JABOATAO II  DIST1 DIT   017/2012 IPCA RPEC CC 017/2012 29/04/2018 1/6/2042 184,190.99
  JABOATAO II MC 69 kV TR 230/69 kV JABOATAO II TR2 PE RBF FT TR 230/69 kV JABOATAO II TR2 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 1/6/2042 212,418.95
  JABOATAO II MC 69 kV TR 230/69 kV JABOATAO II TR1 PE RBF FT TR 230/69 kV JABOATAO II TR1 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 1/6/2042 212,418.95
  JABOATAO II IB 230 kV MG 230 kV JABOATAO II MG1 PE IB1 RB FT MG 230 kV JABOATAO II MG1 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 1/6/2042 453,501.72
  JABOATAO II MC 230 kV TR 230/69 kV JABOATAO II TR2 PE RBF FT TR 230/69 kV JABOATAO II TR2 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 1/6/2042 520,960.84
  JABOATAO II MC 230 kV TR 230/69 kV JABOATAO II TR1 PE RBF FT TR 230/69 kV JABOATAO II TR1 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 1/6/2042 520,960.84
  JABOATAO II MG 230 kV JABOATAO II MG1 PE RB FT MG 230 kV JABOATAO II MG1 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 1/6/2042 1,129,046.91
  JABOATAO II TR 230/69 kV JABOATAO II TR2 PE RBF FT TR 230/69 kV JABOATAO II TR2 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 1/6/2042 1,622,582.58
  JABOATAO II TR 230/69 kV JABOATAO II TR1 PE RBF FT TR 230/69 kV JABOATAO II TR1 PE 017/2012 IPCA RBL CC 017/2012 29/04/2018 1/6/2042 1,622,582.58
  JACARACANGA EL 69 kV JACARACANGA  DIST4 DIT   061/2001 IPCA RCDM REA 2040/2009 8/6/2014 7/6/2044 8,575.82
  JACARACANGA EL 69 kV JACARACANGA  DIST3 DIT   061/2001 IPCA RCDM REA 2040/2009 8/6/2014 7/6/2044 8,575.82
  JACARACANGA TR 230/69 kV JACARACANGA TR1 BA RBF FT TR 230/69 kV JACARACANGA TR1 BA 061/2001 IPCA RMEL REN 443/2011 22/04/2017 21/04/2051 9,198.76
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RMEL REN 443/2011 19/12/2015 18/12/2045 13,805.25
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RMEL REN 443/2011 19/12/2015 18/12/2045 13,805.25
  JACARACANGA MC 69 kV TT 69/13,8 kV JACARACANGA TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  JACARACANGA MC 69 kV TT 69/13,8 kV JACARACANGA TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  JACARACANGA TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RMEL REN 443/2011 26/04/2017 25/04/2051 27,603.43
  JACARACANGA TR 69/13,8 kV JACARACANGA TR7 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  JACARACANGA TR 69/13,8 kV JACARACANGA TR7 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  JACARACANGA IB 69 kV MG 230 kV JACARACANGA MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  JACARACANGA IB 69 kV MG 230 kV JACARACANGA MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  JACARACANGA MC 69 kV TR 230/69 kV JACARACANGA TR3 BA RBF FT TR 230/69 kV JACARACANGA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  JACARACANGA MC 69 kV TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  JACARACANGA MC 69 kV TR 230/69 kV JACARACANGA TR1 BA RBF FT TR 230/69 kV JACARACANGA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RMEL REN 643/2014 15/11/2013 14/11/2041 74,392.25
  JACARACANGA MC 69 kV BC 69 kV 27,1 Mvar JACARACANGA BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  JACARACANGA EL 69 kV JACARACANGA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JACARACANGA EL 69 kV JACARACANGA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JACARACANGA EL 69 kV JACARACANGA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JACARACANGA EL 69 kV JACARACANGA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JACARACANGA TR 69/13,8 kV JACARACANGA TR7 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 11/8/2014 10/8/2040 88,082.11
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 1/9/2014 31/08/2040 88,246.94
  JACARACANGA TT 69/13,8 kV JACARACANGA TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  JACARACANGA MC 69 kV BC 69 kV 27,1 Mvar JACARACANGA BC2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  JACARACANGA EL 69 kV JACARACANGA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  JACARACANGA EL 69 kV JACARACANGA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  JACARACANGA EL 69 kV JACARACANGA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  JACARACANGA EL 69 kV JACARACANGA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RCDM REA 5861/2016 8/2/2015 7/2/2030 112,139.93
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RCDM REA 5861/2016 8/2/2015 7/2/2030 112,139.93
  JACARACANGA TT 69/13,8 kV JACARACANGA TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  JACARACANGA IB 69 kV MG 230 kV JACARACANGA MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  JACARACANGA BC 69 kV 27,1 Mvar JACARACANGA BC2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 134,422.38
  JACARACANGA IB 230 kV MG 230 kV JACARACANGA MG1 BA IB1 RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  JACARACANGA MC 230 kV TR 230/69 kV JACARACANGA TR3 BA RBF FT TR 230/69 kV JACARACANGA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  JACARACANGA MC 230 kV TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  JACARACANGA MC 230 kV TR 230/69 kV JACARACANGA TR1 BA RBF FT TR 230/69 kV JACARACANGA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  JACARACANGA TT 69/13,8 kV JACARACANGA TA1 BA DIT   061/2001 IPCA RCDM REA 3578/2012 5/2/2017 4/2/2047 223,319.30
  JACARACANGA MC 69 kV BC 69 kV 27,1 Mvar JACARACANGA BC2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  JACARACANGA EL 69 kV JACARACANGA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  JACARACANGA EL 69 kV JACARACANGA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  JACARACANGA EL 69 kV JACARACANGA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  JACARACANGA EL 69 kV JACARACANGA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JACARACANGA TT 69/13,8 kV JACARACANGA TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  JACARACANGA TR 230/69 kV JACARACANGA TR3 BA RBF FT TR 230/69 kV JACARACANGA TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  JACARACANGA TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  JACARACANGA TR 230/69 kV JACARACANGA TR1 BA RBF FT TR 230/69 kV JACARACANGA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  JACARACANGA TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  JACARACANGA TR 230/69 kV JACARACANGA TR1 BA RBF FT TR 230/69 kV JACARACANGA TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  JACARACANGA MG 230 kV JACARACANGA MG1 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 584,374.78
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  JACARACANGA EL 230 kV JACARACANGA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  JACARACANGA MG 230 kV JACARACANGA MG1 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 806,661.85
  JACARACANGA TR 230/69 kV JACARACANGA TR2 BA RBF FT TR 230/69 kV JACARACANGA TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  JACARACANGA MG 230 kV JACARACANGA MG1 BA RB FT MG 230 kV JACARACANGA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,769,471.40
  JAGUARARI-SE MG 230 kV JAGUARARI-SE MG1 BA RB FT MG 230 kV JAGUARARI-SE MG1 BA 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 32,197.76
  JAGUARARI-SE MC 230 kV  04T2 M CARAIBA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JAGUARARI-SE MC 230 kV  04T1 M CARAIBA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JAGUARARI-SE EL 230 kV JAGUARARI-SE LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JAGUARARI-SE EL 230 kV JAGUARARI-SE LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JAGUARARI-SE MG 230 kV JAGUARARI-SE MG1 BA RB FT MG 230 kV JAGUARARI-SE MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 415,048.59
  JAGUARARI-SE EL 230 kV JAGUARARI-SE LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042 457,331.74
  JAGUARARI-SE EL 230 kV JAGUARARI-SE LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042 457,331.74
  JAGUARARI-SE IB 230 kV MG 230 kV JAGUARARI-SE MG1 BA IB1 RB FT MG 230 kV JAGUARARI-SE MG1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2043 881,191.17
  JARDIM EL 230 kV JARDIM  CIMESA DIT   061/2001 IPCA RMEL REN 443/2011 8/9/2013 7/9/2043 14,683.46
  JARDIM EL 230 kV JARDIM  CIMESA DIT   061/2001 IPCA RMEL REN 443/2011 8/9/2013 7/9/2043 14,683.46
  JARDIM EL 230 kV JARDIM  CIMESA DIT   061/2001 IPCA RMEL REN 443/2011 8/9/2013 7/9/2043 14,683.46
  JARDIM MC 500 kV TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RMEL REN 443/2011 20/11/2016 19/11/2039 15,521.53

 

81 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  JARDIM EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RMEL REN 643/2014 3/3/2013 2/3/2043 16,272.06
  JARDIM EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RMEL REN 643/2014 13/04/2013 12/4/2043 16,327.48
  JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RMEL REN 443/2011 30/03/2014 29/03/2044 16,801.85
  JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RMEL REN 443/2011 30/03/2014 29/03/2044 16,801.85
  JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RMEL REN 443/2011 30/03/2014 29/03/2044 16,801.85
  JARDIM TR 500/230 kV JARDIM TR7 SE RB FT TR 500/230 kV JARDIM TR7 SE 061/2001 IPCA RMEL REN 643/2014 6/10/2013 5/10/2047 19,991.73
  JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBNI REA 5861/2016 8/6/2016 7/6/2044 27,147.36
  JARDIM MC 69 kV TT 69/13,8 kV JARDIM TA2 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  JARDIM MC 69 kV TT 69/13,8 kV JARDIM TA1 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  JARDIM TR 230/69 kV JARDIM TR2 SE RBF FT TR 230/69 kV JARDIM TR2 SE 061/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2051 27,985.84
  JARDIM TR 69/13,8 kV JARDIM TR5 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 3/12/2015 2/12/2032 30,489.66
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2043 31,586.03
  JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RMEL REN 643/2014 3/11/2013 2/11/2043 33,206.36
  JARDIM TR 69/13,8 kV JARDIM TR5 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2031 40,372.42
  JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2031 40,372.42
  JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RMEL REN 643/2014 6/11/2013 5/11/2048 41,297.24
  JARDIM IB 69 kV MG 500 kV JARDIM MG1 SE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB2 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 13/04/2014 12/4/2044 48,774.06
  JARDIM TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RMEL REN 643/2014 29/09/2013 28/09/2047 55,657.24
  JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RMEL REN 643/2014 19/01/2014 18/01/2044 61,556.77
  JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RMEL REN 643/2014 2/2/2014 1/2/2044 61,625.41
  JARDIM MC 230 kV TR 230/69 kV JARDIM TR1 SE RBF FT TR 230/69 kV JARDIM TR1 SE 061/2001 IPCA RMEL REN 643/2014 9/3/2014 8/3/2044 61,796.97
  JARDIM MC 69 kV TR 230/69 kV JARDIM TR4 SE RBF FT TR 230/69 kV JARDIM TR4 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  JARDIM MC 69 kV TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  JARDIM MC 69 kV TR 230/69 kV JARDIM TR2 SE RBF FT TR 230/69 kV JARDIM TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  JARDIM MC 69 kV TR 230/69 kV JARDIM TR1 SE RBF FT TR 230/69 kV JARDIM TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB2 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044 72,878.05
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 23/03/2014 22/03/2044 73,039.79
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 27/04/2014 26/04/2044 73,241.96
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 443/2011 29/12/2016 28/12/2044 74,224.06
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC3 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC2 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC1 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  JARDIM EL 69 kV JARDIM  UPGN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JARDIM EL 69 kV JARDIM  TAICOCA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JARDIM EL 69 kV JARDIM  S.CRISTOVAO DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JARDIM EL 69 kV JARDIM  RIACHUELO C-2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JARDIM EL 69 kV JARDIM  RIACHUELO C-1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JARDIM EL 69 kV JARDIM  M.URUBU DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JARDIM EL 69 kV JARDIM  GRAGERO C-2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JARDIM EL 69 kV JARDIM  GRAGERO C-1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JARDIM EL 69 kV JARDIM  ESTANCIA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JARDIM EL 69 kV JARDIM  ATALAIA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JARDIM EL 69 kV JARDIM  ARACAJU C-2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JARDIM EL 69 kV JARDIM  ARACAJU C-1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JARDIM EL 69 kV JARDIM  02X3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JARDIM EL 69 kV JARDIM  02X2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JARDIM TR 69/13,8 kV JARDIM TR5 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  JARDIM MC 69 kV TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 443/2011 17/03/2016 16/03/2044 90,871.24
  JARDIM TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RMEL REN 443/2011 18/06/2017 17/06/2051 91,499.96
  JARDIM TT 69/13,8 kV JARDIM TA2 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  JARDIM BC 69 kV 20,3 Mvar JARDIM BC1 SE DIT   061/2001 IPCA RMEL REN 643/2014 25/10/2013 24/10/2033 96,942.94
  JARDIM BC 69 kV 20,3 Mvar JARDIM BC3 SE DIT   061/2001 IPCA RMEL REN 643/2014 1/11/2013 31/10/2033 97,023.42
  JARDIM BC 69 kV 20,3 Mvar JARDIM BC2 SE DIT   061/2001 IPCA RMEL REN 643/2014 6/11/2013 5/11/2033 97,080.90
  JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBNI REA 5861/2016 8/6/2016 7/6/2031 103,359.64
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC3 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC2 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC1 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  JARDIM EL 69 kV JARDIM  TAICOCA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  JARDIM EL 69 kV JARDIM  ATALAIA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  JARDIM EL 69 kV JARDIM  02X3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  JARDIM BC 69 kV 20,3 Mvar JARDIM BC3 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,338.74
  JARDIM BC 69 kV 20,3 Mvar JARDIM BC2 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,338.74
  JARDIM BC 69 kV 20,3 Mvar JARDIM BC1 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,338.74
  JARDIM TT 69/13,8 kV JARDIM TA2 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  JARDIM IB 230 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  JARDIM MC 230 kV TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  JARDIM MC 230 kV TR 230/69 kV JARDIM TR4 SE RBF FT TR 230/69 kV JARDIM TR4 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  JARDIM MC 230 kV TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  JARDIM MC 230 kV TR 230/69 kV JARDIM TR2 SE RBF FT TR 230/69 kV JARDIM TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  JARDIM MC 230 kV TR 230/69 kV JARDIM TR1 SE RBF FT TR 230/69 kV JARDIM TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBNI REA 5225/2015 17/12/2017 16/12/2045 212,190.56
  JARDIM TT 69/13,8 kV JARDIM TA1 SE DIT   061/2001 IPCA RCDM REA 3578/2012 31/01/2016 30/01/2046 217,974.81
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC3 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC2 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  JARDIM MC 69 kV BC 69 kV 20,3 Mvar JARDIM BC1 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  JARDIM EL 69 kV JARDIM  ATALAIA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  JARDIM EL 69 kV JARDIM  02X3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  JARDIM MC 230 kV TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  JARDIM MC 230 kV TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  JARDIM EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-1 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JARDIM EL 230 kV JARDIM LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86

 

82 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  JARDIM EL 230 kV JARDIM  CIMESA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RMEL REN 643/2014 7/2/2014 6/2/2028 235,940.46
  JARDIM RTL 500 kV 40 Mvar JARDIM RTR1 SE RB FT RTL 500 kV 40 Mvar JARDIM RTR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 249,484.75
  JARDIM MC 500 kV RTL 500 kV 40 Mvar JARDIM RTR1 SE RB FT RTL 500 kV 40 Mvar JARDIM RTR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  JARDIM TT 69/13,8 kV JARDIM TA2 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  JARDIM EL 69 kV JARDIM  ATALAIA C2 DIT   061/2001 IPCA RCDM REA 1814/2009 15/08/2012 14/08/2040 314,108.74
  JARDIM EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-1 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  JARDIM RTL 500 kV 40 Mvar JARDIM RTR1 SE RB FT RTL 500 kV 40 Mvar JARDIM RTR1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,384.87
  JARDIM TR 230/69 kV JARDIM TR4 SE RBF FT TR 230/69 kV JARDIM TR4 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  JARDIM TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  JARDIM TR 230/69 kV JARDIM TR2 SE RBF FT TR 230/69 kV JARDIM TR2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  JARDIM TR 230/69 kV JARDIM TR1 SE RBF FT TR 230/69 kV JARDIM TR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  JARDIM EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-2 SE RB FT LT 230 kV N.S.SOCORRO /JARDIM C-2 SE 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 396,259.45
  JARDIM MC 500 kV TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB2 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  JARDIM EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  JARDIM TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  JARDIM TR 230/69 kV JARDIM TR2 SE RBF FT TR 230/69 kV JARDIM TR2 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  JARDIM TR 230/69 kV JARDIM TR1 SE RBF FT TR 230/69 kV JARDIM TR1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  JARDIM MC 230 kV TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  JARDIM MC 230 kV TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  JARDIM MC 500 kV TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB2 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  JARDIM TR 500/230 kV JARDIM TRR1 SE RB FT TR 500/230 kV JARDIM TRR1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 647,846.29
  JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  JARDIM EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 699,548.56
  JARDIM EL 230 kV JARDIM LT 230 kV N.S.SOCORRO /JARDIM C-1 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  JARDIM RTL 500 kV 40 Mvar JARDIM RTR1 SE RB FT RTL 500 kV 40 Mvar JARDIM RTR1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 755,433.24
  JARDIM TR 500/230 kV JARDIM TRR1 SE RB FT TR 500/230 kV JARDIM TRR1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 894,276.94
  JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 965,645.95
  JARDIM TR 230/69 kV JARDIM TR3 SE RBF FT TR 230/69 kV JARDIM TR3 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  JARDIM MC 230 kV TR 500/230 kV JARDIM TR7 SE RB FT TR 500/230 kV JARDIM TR7 SE 061/2001 IPCA RBNI REA 2181/2009 17/12/2012 16/12/2042 1,156,149.61
  JARDIM MC 230 kV TR 500/230 kV JARDIM TR8 SE RB FT TR 500/230 kV JARDIM TR8 SE 061/2001 IPCA RBNI REA 5225/2015 17/12/2017 16/12/2047 1,304,166.65
  JARDIM MC 500 kV TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,306,279.44
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,346,529.53
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB2 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  JARDIM IB 500 kV MG 500 kV JARDIM MG1 SE IB1 RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  JARDIM EL 500 kV JARDIM LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,480,048.26
  JARDIM EL 500 kV JARDIM LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,480,048.26
  JARDIM MC 500 kV TR 500/230 kV JARDIM TR7 SE RB FT TR 500/230 kV JARDIM TR7 SE 061/2001 IPCA RBNI REA 2181/2009 17/12/2012 16/12/2043 1,781,301.20
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,858,728.41
  JARDIM TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  JARDIM TR 500/230 kV JARDIM TRR1 SE RB FT TR 500/230 kV JARDIM TRR1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,961,661.47
  JARDIM MC 500 kV TR 500/230 kV JARDIM TR8 SE RB FT TR 500/230 kV JARDIM TR8 SE 061/2001 IPCA RBNI REA 5225/2015 17/12/2017 16/12/2048 2,079,591.97
  JARDIM RTL 500 kV 99,1 Mvar JARDIM RT1 SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,118,214.58
  JARDIM TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,682,830.82
  JARDIM MG 500 kV JARDIM MG1 SE RB FT MG 500 kV JARDIM MG1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,077,255.88
  JARDIM TR 500/230 kV JARDIM TR7 SE RB FT TR 500/230 kV JARDIM TR7 SE 061/2001 IPCA RBNI REA 2181/2009 17/12/2012 16/12/2047 5,034,768.54
  JARDIM TR 500/230 kV JARDIM TR8 SE RB FT TR 500/230 kV JARDIM TR8 SE 061/2001 IPCA RBNI REA 5225/2015 17/12/2017 16/12/2052 5,603,254.90
  JARDIM TR 500/230 kV JARDIM TR6 SE RB FT TR 500/230 kV JARDIM TR6 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,884,984.41
  JOAIRAM MG 230 kV JOAIRAM MG1 PE RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RMEL REN 443/2011 4/4/2016 3/4/2044 1,311.38
  JOAIRAM MG 230 kV JOAIRAM MG1 PE RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2046 2,367.12
  JOAIRAM EL 69 kV JOAIRAM  VARZEA C2 DIT   061/2001 IPCA RMEL REN 443/2011 17/05/2015 16/05/2038 7,005.09
  JOAIRAM MC 230 kV TR 230/69 kV JOAIRAM TR3 PE RBF FT TR 230/69 kV JOAIRAM TR3 PE 061/2001 IPCA RMEL REN 443/2011 18/10/2017 17/10/2047 11,328.85
  JOAIRAM MC 69 kV TT 69/0 kV JOAIRAM TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  JOAIRAM MG 230 kV JOAIRAM MG1 PE RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 29,451.48
  JOAIRAM IB 69 kV MG 230 kV JOAIRAM MG1 PE IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  JOAIRAM MG 230 kV JOAIRAM MG1 PE RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RBNI REA 1814/2009 30/09/2012 29/09/2040 46,038.31
  JOAIRAM MC 69 kV TR 230/69 kV JOAIRAM TR3 PE RBF FT TR 230/69 kV JOAIRAM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  JOAIRAM MC 69 kV TR 230/69 kV JOAIRAM TR2 PE RBF FT TR 230/69 kV JOAIRAM TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  JOAIRAM MC 69 kV TR 230/69 kV JOAIRAM TR1 PE RBF FT TR 230/69 kV JOAIRAM TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  JOAIRAM EL 69 kV JOAIRAM  VARZEA C2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JOAIRAM EL 69 kV JOAIRAM  VARZEA C1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JOAIRAM EL 69 kV JOAIRAM  JOBOTAO C2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JOAIRAM EL 69 kV JOAIRAM  JOBOTAO C1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JOAIRAM TT 69/0 kV JOAIRAM TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  JOAIRAM IB 230 kV MG 230 kV JOAIRAM MG1 PE IB1 RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  JOAIRAM MC 230 kV TR 230/69 kV JOAIRAM TR3 PE RBF FT TR 230/69 kV JOAIRAM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  JOAIRAM MC 230 kV TR 230/69 kV JOAIRAM TR2 PE RBF FT TR 230/69 kV JOAIRAM TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  JOAIRAM MC 230 kV TR 230/69 kV JOAIRAM TR1 PE RBF FT TR 230/69 kV JOAIRAM TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  JOAIRAM TT 69/0 kV JOAIRAM TA2 PE DIT   061/2001 IPCA RCDM REA 2837/2011 27/04/2014 26/04/2044 195,436.86
  JOAIRAM EL 230 kV JOAIRAM LT 230 kV RECIFE II /JOAIRAM C-3 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  JOAIRAM EL 230 kV JOAIRAM LT 230 kV RECIFE II /JOAIRAM C-2 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  JOAIRAM EL 230 kV JOAIRAM LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  JOAIRAM EL 230 kV JOAIRAM LT 230 kV BONGI /JOAIRAM C-3 PE RB FT LT 230 kV BONGI /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  JOAIRAM EL 230 kV JOAIRAM LT 230 kV BONGI /JOAIRAM C-2 PE RB FT LT 230 kV BONGI /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  JOAIRAM EL 230 kV JOAIRAM LT 230 kV BONGI /JOAIRAM C-1 PE RB FT LT 230 kV BONGI /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  JOAIRAM TR 230/69 kV JOAIRAM TR3 PE RBF FT TR 230/69 kV JOAIRAM TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 432,319.03
  JOAIRAM TR 230/69 kV JOAIRAM TR2 PE RBF FT TR 230/69 kV JOAIRAM TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 432,319.03
  JOAIRAM TR 230/69 kV JOAIRAM TR1 PE RBF FT TR 230/69 kV JOAIRAM TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 432,319.03
  JOAIRAM EL 69 kV JOAIRAM  TEJIPIO DIT   061/2001 IPCA RCDM REA 1814/2009 30/09/2012 29/09/2042 437,012.81
  JOAIRAM MG 230 kV JOAIRAM MG1 PE RB FT MG 230 kV JOAIRAM MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 598,697.24

 

83 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

  JOAO CAMARA II MG 230 kV JOAO CAMARA II MG1 RN RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RBNI REA 8314/2019 31/08/2018 30/08/2033 9,521.87
  JOAO CAMARA II MG 230 kV JOAO CAMARA II MG1 RN RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RBNI REN 443/2011 27/02/2014 26/02/2045 29,763.66
  JOAO CAMARA II MG 69 kV JOAO CAMARA II MG1 RN ICG   019/2010 IPCA RICGNI REN 443/2011 31/03/2015 30/03/2030 35,782.92
  JOAO CAMARA II MG 69 kV JOAO CAMARA II MG1 RN ICG   019/2010 IPCA RICGNI REA 4445/2013 29/10/2017 29/10/2046 36,469.27
  JOAO CAMARA II MG 230 kV JOAO CAMARA II MG1 RN RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RMEL REN 643/2014 31/03/2015 30/03/2030 39,132.68
  JOAO CAMARA II MC 69 kV TT 69/0 kV JOAO CAMARA II TT1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 46,960.08
  JOAO CAMARA II TT 69/0 kV JOAO CAMARA II TT1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 60,715.57
  JOAO CAMARA II IB 69 kV MG 69 kV JOAO CAMARA II MG1 RN IB1 ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 75,077.77
  JOAO CAMARA II MC 69 kV TR 230/69 kV JOAO CAMARA II TR2 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 110,103.88
  JOAO CAMARA II MC 69 kV TR 230/69 kV JOAO CAMARA II TR1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 110,103.88
  JOAO CAMARA II EL 230 kV JOAO CAMARA II  UNI. DOS VENTOS DIT   061/2001 IPCA RCDM REA 6675/2017 1/7/2018 28/02/2038 121,848.74
  JOAO CAMARA II MC 69 kV BC 69 kV 21 Mvar JOAO CAMARA II BC4 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 133,700.50
  JOAO CAMARA II MC 69 kV BC 69 kV 21 Mvar JOAO CAMARA II BC3 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 133,700.50
  JOAO CAMARA II MC 69 kV BC 69 kV 21 Mvar JOAO CAMARA II BC2 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 133,700.50
  JOAO CAMARA II MC 69 kV BC 69 kV 21 Mvar JOAO CAMARA II BC1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 133,700.50
  JOAO CAMARA II IB 230 kV MG 230 kV JOAO CAMARA II MG1 RN IB1 RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040 185,113.41
  JOAO CAMARA II BC 69 kV 21 Mvar JOAO CAMARA II BC4 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 189,814.54
  JOAO CAMARA II BC 69 kV 21 Mvar JOAO CAMARA II BC3 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 189,814.54
  JOAO CAMARA II BC 69 kV 21 Mvar JOAO CAMARA II BC2 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 189,814.54
  JOAO CAMARA II BC 69 kV 21 Mvar JOAO CAMARA II BC1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 189,814.54
  JOAO CAMARA II MC 230 kV TR 230/69 kV JOAO CAMARA II TR2 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 270,615.92
  JOAO CAMARA II MC 230 kV TR 230/69 kV JOAO CAMARA II TR1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 270,615.92
  JOAO CAMARA II EL 69 kV JOAO CAMARA II  02P4 ICG   019/2010 IPCA RICGNI REN 443/2011 27/02/2014 26/02/2037 278,188.55
  JOAO CAMARA II EL 69 kV JOAO CAMARA II  02P3 ICG   019/2010 IPCA RICGNI REN 443/2011 27/02/2014 26/02/2037 278,188.55
  JOAO CAMARA II MG 69 kV JOAO CAMARA II MG1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 304,007.30
  JOAO CAMARA II EL 230 kV JOAO CAMARA II LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN RB FT LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040 344,500.00
  JOAO CAMARA II BC 230 kV 50 Mvar JOAO CAMARA II BC6 RN RB FT BC 230 kV 50,5 Mvar JOAO CAMARA II BC6 RN 019/2010 IPCA RBNI REA 4445/2013 16/11/2017 16/11/2037 363,375.88
  JOAO CAMARA II BC 230 kV 50 Mvar JOAO CAMARA II BC5 RN RB FT BC 230 kV 50,5 Mvar JOAO CAMARA II BC5 RN 019/2010 IPCA RBNI REA 4445/2013 26/11/2017 26/11/2037 363,379.57
  JOAO CAMARA II MG 230 kV JOAO CAMARA II MG1 RN RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RBNI REA 4445/2013 15/05/2020 15/05/2052 380,312.49
  JOAO CAMARA II MC 69 kV TR 230/69 kV JOAO CAMARA II TR3 RN ICG   019/2010 IPCA RICGNI REA 4445/2013 29/10/2017 29/10/2040 397,839.52
  JOAO CAMARA II MG 230 kV JOAO CAMARA II MG1 RN RB FT MG 230 kV JOAO CAMARA II MG1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040 514,680.75
  JOAO CAMARA II TR 230/69 kV JOAO CAMARA II TR2 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 563,755.45
  JOAO CAMARA II TR 230/69 kV JOAO CAMARA II TR1 RN ICG   019/2010 IPCA RICG CC 019/2010 28/02/2014 23/11/2040 563,755.45
  JOAO CAMARA II MC 230 kV TR 230/69 kV JOAO CAMARA II TR3 RN ICG   019/2010 IPCA RICGNI REA 4445/2013 29/10/2017 29/10/2041 1,077,968.89
  JOAO CAMARA II MC 230 kV BC 230 kV 50 Mvar JOAO CAMARA II BC6 RN RB FT BC 230 kV 50,5 Mvar JOAO CAMARA II BC6 RN 019/2010 IPCA RBNI REA 4445/2013 16/11/2017 16/11/2043 1,112,430.85
  JOAO CAMARA II MC 230 kV BC 230 kV 50 Mvar JOAO CAMARA II BC5 RN RB FT BC 230 kV 50,5 Mvar JOAO CAMARA II BC5 RN 019/2010 IPCA RBNI REA 4445/2013 26/11/2017 26/11/2043 1,112,439.42
  JOAO CAMARA II TR 230/69 kV JOAO CAMARA II TR3 RN ICG   019/2010 IPCA RICGNI REA 4445/2013 29/10/2017 29/10/2052 1,842,255.75
  JOAO CAMARA III MG 138 kV JOAO CAMARA III MG1 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/05/2016 13/05/2031 33,636.85
  JOAO CAMARA III MG 138 kV JOAO CAMARA III MG1 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031 33,904.19
  JOAO CAMARA III MG 138 kV JOAO CAMARA III MG1 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031 33,904.19
  JOAO CAMARA III MG 138 kV JOAO CAMARA III MG1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 58,531.81
  JOAO CAMARA III IB 138 kV MG 138 kV JOAO CAMARA III MG1 RN IB1 ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 135,341.50
  JOAO CAMARA III MC 138 kV TR 500/138 kV JOAO CAMARA III TR2 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 180,407.92
  JOAO CAMARA III MC 138 kV TR 500/138 kV JOAO CAMARA III TR1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 180,407.92
  JOAO CAMARA III MC 138 kV BC 138 kV 50 Mvar JOAO CAMARA III BC1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 185,771.74
  JOAO CAMARA III IB 138 kV MG 138 kV JOAO CAMARA III MG1 RN IB2 ICG   008/2011 IPCA RICGNI REA 4443/2013 14/05/2016 13/05/2031 219,113.41
  JOAO CAMARA III MG 500 kV JOAO CAMARA III MG1 RN RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 13/03/2047 265,933.76
  JOAO CAMARA III MG 500 kV JOAO CAMARA III MG1 RN RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 13/03/2047 265,933.76
  JOAO CAMARA III BC 138 kV 50 Mvar JOAO CAMARA III BC1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 278,736.37
  JOAO CAMARA III MC 138 kV TR 500/138 kV JOAO CAMARA III ATR4 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031 405,018.47
  JOAO CAMARA III MC 138 kV TR 500/138 kV JOAO CAMARA III ATR3 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031 405,018.47
  JOAO CAMARA III IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB2 RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 590,048.88
  JOAO CAMARA III IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB1 RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 590,048.88
  JOAO CAMARA III EL 500 kV JOAO CAMARA III LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN RB FT LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 618,609.07
  JOAO CAMARA III MC 500 kV TR 500/138 kV JOAO CAMARA III TR2 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 649,103.18
  JOAO CAMARA III MC 500 kV TR 500/138 kV JOAO CAMARA III TR1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 649,103.18
  JOAO CAMARA III MG 500 kV JOAO CAMARA III MG1 RN RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 690,356.71
  JOAO CAMARA III RTB 500 kV 0 Mvar JOAO CAMARA III RTBR1 RN RB FT RTB 500 kV 150 Mvar JOAO CAMARA III RTBR1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 13/03/2052 717,011.44
  JOAO CAMARA III TR 500/138 kV JOAO CAMARA III TRR1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 846,787.47
  JOAO CAMARA III MC 500 kV RTB 500 kV 0 Mvar JOAO CAMARA III RTB1 RN RB FT RTB 500 kV 0 Mvar JOAO CAMARA III RTB1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 13/03/2044 1,131,746.99
  JOAO CAMARA III IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB4 RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 13/03/2047 1,250,189.88
  JOAO CAMARA III IB 500 kV MG 500 kV JOAO CAMARA III MG1 RN IB3 RB FT MG 500 kV JOAO CAMARA III MG1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 13/03/2047 1,250,189.88
  JOAO CAMARA III MC 500 kV TR 500/138 kV JOAO CAMARA III ATR4 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031 1,391,167.29
  JOAO CAMARA III MC 500 kV TR 500/138 kV JOAO CAMARA III ATR3 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031 1,391,167.29
  JOAO CAMARA III RTB 500 kV 0 Mvar JOAO CAMARA III RTB1 RN RB FT RTB 500 kV 0 Mvar JOAO CAMARA III RTB1 RN 008/2011 IPCA RBNI REA 4443/2013 14/03/2016 13/03/2052 2,151,034.33
  JOAO CAMARA III TR 500/138 kV JOAO CAMARA III TR2 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 2,540,363.58
  JOAO CAMARA III TR 500/138 kV JOAO CAMARA III TR1 RN ICG   008/2011 IPCA RICG CC 008/2011 13/10/2014 13/10/2041 2,540,363.58
  JOAO CAMARA III TR 500/138 kV JOAO CAMARA III ATR4 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031 4,546,139.10
  JOAO CAMARA III TR 500/138 kV JOAO CAMARA III ATR3 RN ICG   008/2011 IPCA RICGNI REA 4443/2013 14/03/2016 13/03/2031 4,546,139.10
  JUAZEIRO II EL 69 kV JUAZEIRO II  JUNCO 02C7 DIT   061/2001 IPCA RCDM REA 1814/2009 21/12/2014 20/12/2044 14,828.44
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 9/6/2016 8/6/2044 27,804.13
  JUAZEIRO II TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBNI REA 7761/2019 31/07/2015 30/07/2030 28,485.47
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 10/9/2015 9/9/2030 28,512.08
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RMEL REN 643/2014 27/11/2015 26/11/2032 31,126.23
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RMEL REN 443/2011 11/8/2016 10/8/2033 32,124.24
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBNI REA 5861/2016 10/9/2015 9/9/2043 34,492.49
  JUAZEIRO II TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  JUAZEIRO II IB 69 kV MG 230 kV JUAZEIRO II MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  JUAZEIRO II MC 13,8 kV TR 13,8/0,22 kV JUAZEIRO II TR5 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  JUAZEIRO II MC 13,8 kV TR 13,8/0,22 kV JUAZEIRO II TR4 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBNI REA 2376/2010 13/12/2017 12/12/2045 61,146.66
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBNI REA 2376/2010 13/12/2017 12/12/2045 61,146.66
  JUAZEIRO II MC 69 kV TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR3 BA RBF FT TR 230/69 kV JUAZEIRO II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20

 

 

84 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

  JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR1 BA RBF FT TR 230/69 kV JUAZEIRO II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  JUAZEIRO II EL 69 kV JUAZEIRO II  TOURAO 02C6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JUAZEIRO II EL 69 kV JUAZEIRO II  SALITRE 02C8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JUAZEIRO II EL 69 kV JUAZEIRO II  PETROLINA 02C5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JUAZEIRO II EL 69 kV JUAZEIRO II  PETROLINA 02C4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JUAZEIRO II EL 69 kV JUAZEIRO II  JUNCO 02C7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JUAZEIRO II EL 69 kV JUAZEIRO II  JUAZEIRO I 02C3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JUAZEIRO II EL 69 kV JUAZEIRO II  JUAZEIRO I 02C2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JUAZEIRO II EL 69 kV JUAZEIRO II  CARAIBA 02C1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/12/2013 29/12/2041 79,941.47
  JUAZEIRO II TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  JUAZEIRO II MC 69 kV TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  JUAZEIRO II TT 69/13,8 kV JUAZEIRO II TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  JUAZEIRO II TT 69/0 kV JUAZEIRO II TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  JUAZEIRO II EL 69 kV JUAZEIRO II  JUNCO 02C7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2038 111,017.16
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 9/6/2016 8/6/2031 115,664.98
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBNI REA 5861/2016 19/09/2017 18/09/2032 116,858.82
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 19/09/2017 18/09/2032 116,858.82
  JUAZEIRO II IB 230 kV MG 230 kV JUAZEIRO II MG1 BA IB1 RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR3 BA RBF FT TR 230/69 kV JUAZEIRO II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR1 BA RBF FT TR 230/69 kV JUAZEIRO II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  JUAZEIRO II MC 69 kV TR 69/13,8 kV JUAZEIRO II TR6 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  JUAZEIRO II EL 69 kV JUAZEIRO II  JUNCO 02C7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JUAZEIRO II EL 230 kV JUAZEIRO II LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR3 BA RBF FT TR 230/69 kV JUAZEIRO II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR1 BA RBF FT TR 230/69 kV JUAZEIRO II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  JUAZEIRO II MC 69 kV TR 230/69 kV JUAZEIRO II TR4 BA RBF FT TR 230/69 kV JUAZEIRO II TR4 BA 061/2001 IPCA RBNI REA 2823/2011 28/09/2015 27/09/2045 466,476.72
  JUAZEIRO II EL 69 kV JUAZEIRO II  02M2 DIT   061/2001 IPCA RCDM REA 2376/2010 13/12/2017 12/12/2047 495,562.96
  JUAZEIRO II EL 69 kV JUAZEIRO II  02M1 DIT   061/2001 IPCA RCDM REA 2376/2010 13/12/2017 12/12/2047 495,562.96
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR3 BA RBF FT TR 230/69 kV JUAZEIRO II TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR1 BA RBF FT TR 230/69 kV JUAZEIRO II TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR2 BA RBF FT TR 230/69 kV JUAZEIRO II TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 584,658.55
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 807,053.56
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR3 BA RBF FT TR 230/69 kV JUAZEIRO II TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR1 BA RBF FT TR 230/69 kV JUAZEIRO II TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  JUAZEIRO II MC 230 kV TR 230/69 kV JUAZEIRO II TR4 BA RBF FT TR 230/69 kV JUAZEIRO II TR4 BA 061/2001 IPCA RBNI REA 2823/2011 28/09/2015 27/09/2045 1,324,146.82
  JUAZEIRO II TR 230/69 kV JUAZEIRO II TR4 BA RBF FT TR 230/69 kV JUAZEIRO II TR4 BA 061/2001 IPCA RBNI REA 2823/2011 28/09/2015 27/09/2049 1,462,683.41
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBNI REA 2823/2011 28/09/2015 27/09/2045 1,577,065.14
  JUAZEIRO II MG 230 kV JUAZEIRO II MG1 BA RB FT MG 230 kV JUAZEIRO II MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,770,330.65
  JUAZEIRO III EL 500 kV JUAZEIRO III LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBNI REA 9689/2021 31/07/2019 30/07/2047 184,015.06
  JUAZEIRO III EL 500 kV JUAZEIRO III LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBNI REA 9689/2021 31/07/2019 30/07/2047 184,015.06
  LAGOA DO CARRO EL 230 kV LAGOA DO CARRO LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE 061/2001 IPCA RBNI REA 9687/2021 22/10/2020 21/10/2048 147,475.09
  LAGOA DO CARRO EL 230 kV LAGOA DO CARRO LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE 061/2001 IPCA RBNI REA 9687/2021 22/10/2020 21/10/2048 147,475.09
  LAGOA NOVA II MG 69 kV LAGOA NOVA II MG1 RN ICG   010/2011 IPCA RICGNI REA 4876/2014 28/11/2016 27/11/2033 14,608.11
  LAGOA NOVA II MG 230 kV LAGOA NOVA II MG1 RN RB FT MG 230 kV LAGOA NOVA II MG1 RN 010/2011 IPCA RBNI REA 4876/2014 28/11/2016 27/11/2048 57,211.40
  LAGOA NOVA II MC 69 kV TT 69/0 kV LAGOA NOVA II TA1 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 62,045.81
  LAGOA NOVA II MG 69 kV LAGOA NOVA II MG1 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 63,712.71
  LAGOA NOVA II IB 69 kV MG 69 kV LAGOA NOVA II MG1 RN IB1 ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 100,788.82
  LAGOA NOVA II MC 69 kV TR 230/69 kV LAGOA NOVA II TR2 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 147,013.30
  LAGOA NOVA II MC 69 kV TR 230/69 kV LAGOA NOVA II TR1 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 147,013.30
  LAGOA NOVA II TT 69/0 kV LAGOA NOVA II TA1 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 166,670.64
  LAGOA NOVA II MC 69 kV TR 230/69 kV LAGOA NOVA II TR3 RN ICG   010/2011 IPCA RICGNI REA 4876/2014 28/11/2016 27/11/2033 212,342.06
  LAGOA NOVA II IB 230 kV MG 230 kV LAGOA NOVA II MG1 RN IB1 RB FT MG 230 kV LAGOA NOVA II MG1 RN 010/2011 IPCA RBL CC 010/2011 13/10/2011 13/10/2041 292,919.63
  LAGOA NOVA II MC 230 kV TR 230/69 kV LAGOA NOVA II TR2 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 361,434.63
  LAGOA NOVA II MC 230 kV TR 230/69 kV LAGOA NOVA II TR1 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 361,434.63
  LAGOA NOVA II EL 230 kV LAGOA NOVA II LT 230 kV PARAISO /LAGOA NOVA II C-1 RN RB FT LT 230 kV PARAISO /LAGOA NOVA II C-2 RN 010/2011 IPCA RBL CC 010/2011 13/10/2011 13/10/2041 542,678.32
  LAGOA NOVA II MC 230 kV TR 230/69 kV LAGOA NOVA II TR3 RN ICG   010/2011 IPCA RICGNI REA 4876/2014 28/11/2016 27/11/2033 573,037.32
  LAGOA NOVA II MG 230 kV LAGOA NOVA II MG1 RN RB FT MG 230 kV LAGOA NOVA II MG1 RN 010/2011 IPCA RBL CC 010/2011 13/10/2011 13/10/2041 827,208.03
  LAGOA NOVA II TR 230/69 kV LAGOA NOVA II TR2 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 991,749.86
  LAGOA NOVA II TR 230/69 kV LAGOA NOVA II TR1 RN ICG   010/2011 IPCA RICG CC 010/2011 15/01/2016 13/10/2041 991,749.86
  LAGOA NOVA II TR 230/69 kV LAGOA NOVA II TR3 RN ICG   010/2011 IPCA RICGNI REA 4876/2014 28/11/2016 27/11/2033 1,542,575.69
  LT  500 kV P. AFONSO IV /US. L.GONZAGA BA/PE LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBNI REA 5745/2016 10/1/2020 10/1/2049 1,343,243.97
  LT  500 kV P. AFONSO IV /US. L.GONZAGA BA/PE LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,734,292.54
  LT  500 kV P. AFONSO IV /US. L.GONZAGA BA/PE LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,393,990.43
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,169.74
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,169.74
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,169.74
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,169.74
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,169.74
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,169.74
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 49,928.14
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 49,928.14
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 49,928.14
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 49,928.14
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 49,928.14
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 49,928.14

 

85 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 109,521.01
  LT  500 kV P. AFONSO IV /USINA PA-IV   BA LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 109,521.01
  LT  500 kV US. L.GONZAGA/U.SOBRADINHO  PE/BA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 14,653,380.79
  LT  500 kV US. L.GONZAGA/U.SOBRADINHO  PE/BA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 20,227,298.84
  LT  500 kV US. L.GONZAGA/U.SOBRADINHO  PE/BA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 44,370,050.33
  LT 138 kV ACU II /SAN.MATOS II RN LT 138 kV ACU II /SAN.MATOS II C-1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 648,932.15
  LT 138 kV C.GRANDE II /PILOES PB LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 606,604.67
  LT 138 kV C.GRANDE II /PILOES PB LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RCDM REA 1094/2007 9/11/2012 8/11/2052 1,939,457.91
  LT 138 kV C.GRANDE II /SANTA CRUZ II PB/RN LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,213,209.35
  LT 138 kV PARAISO /SANTA CRUZ II RN LT 138 kV PARAISO /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,992.83
  LT 138 kV PARAISO /SANTA CRUZ II RN LT 138 kV PARAISO /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RCDM REA 1094/2007 30/03/2014 29/03/2054 59,004.91
  LT 138 kV PARAISO /SANTA CRUZ II RN LT 138 kV PARAISO /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RCDM REA 2173/2009 30/03/2014 29/03/2052 284,272.07
  LT 138 kV PILOES /PARAISO PB/RN LT 138 kV PILOES /PARAISO C-1 PB/RN DIT   061/2001 IPCA RCDM REA 2173/2009 30/03/2014 29/03/2052 287,066.73
  LT 138 kV PILOES /PARAISO PB/RN LT 138 kV PILOES /PARAISO C-1 PB/RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 578,611.84
  LT 138 kV PILOES /PARAISO PB/RN LT 138 kV PILOES /PARAISO C-1 PB/RN DIT   061/2001 IPCA RCDM REA 1094/2007 30/03/2014 29/03/2054 1,986,782.03
  LT 138 kV USINA PA-II /ZEBU BA LT 138 kV USINA PA-II /ZEBU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,199.83
  LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-3 RN RB FT LT 230 kV ACU III /ACU II C-3 RN 019/2010 IPCA RBNI DSP 1269/2022 1/7/2022 30/06/2056 38,297.90
  LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBNI DSP 1307/2022 1/7/2022 30/06/2056 44,456.26
  LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 208,969.54
  LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-3 RN RB FT LT 230 kV ACU III /ACU II C-3 RN 019/2010 IPCA RBNI REA 4407/2013 23/12/2021 23/12/2058 256,363.44
  LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 288,458.30
  LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBNI REA 4407/2013 5/2/2020 5/2/2057 440,835.58
  LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-1 RN RB FT LT 230 kV ACU III /ACU II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 632,754.26
  LT 230 kV ACU III /ACU II RN LT 230 kV ACU III /ACU II C-3 RN RB FT LT 230 kV ACU III /ACU II C-3 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040 1,452,336.73
  LT 230 kV ALEX /MOSSORO II CE/RN LT 230 kV ALEX /MOSSORO II C-1 CE/RN RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBNI DSP 1183/2022 1/7/2022 30/06/2052 47,595.21
  LT 230 kV ALEX /MOSSORO II CE/RN LT 230 kV ALEX /MOSSORO II C-1 CE/RN RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,635,111.91
  LT 230 kV ALEX /MOSSORO II CE/RN LT 230 kV ALEX /MOSSORO II C-1 CE/RN RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,257,083.04
  LT 230 kV ALEX /MOSSORO II CE/RN LT 230 kV ALEX /MOSSORO II C-1 CE/RN RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,951,075.72
  LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,177,070.57
  LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,183,068.38
  LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBNI REA 7761/2019 6/12/2014 5/12/2051 1,352,575.58
  LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,502,680.97
  LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,624,809.90
  LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,633,089.19
  LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,074,277.43
  LT 230 kV ANGELIM /MESSIAS PE/AL LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,550,078.33
  LT 230 kV ANGELIM /RECIFE II PE LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,574,560.73
  LT 230 kV ANGELIM /RIBEIRAO PE LT 230 kV ANGELIM /RIBEIRAO C-2 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBNI REA 3817/2013 20/08/2019 20/08/2056 26,681.97
  LT 230 kV ANGELIM /RIBEIRAO PE LT 230 kV ANGELIM /RIBEIRAO C-2 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,724,370.90
  LT 230 kV ANGELIM /RIBEIRAO PE LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBNI REA 7761/2019 20/12/2014 19/12/2051 2,059,181.82
  LT 230 kV ANGELIM /RIBEIRAO PE LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,197,979.63
  LT 230 kV ANGELIM /RIBEIRAO PE LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBNI REA 2823/2011 21/01/2015 20/01/2051 5,576,822.74
  LT 230 kV ANGELIM /TACAIMBO PE LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,213,923.06
  LT 230 kV ANGELIM /TACAIMBO PE LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,217,722.51
  LT 230 kV ANGELIM /TACAIMBO PE LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,248,118.08
  LT 230 kV ANGELIM /TACAIMBO PE LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,722,882.77
  LT 230 kV ANGELIM /TACAIMBO PE LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,779,268.60
  LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 189,972.31
  LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,827.59
  LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,715.51
  LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 267,556.59
  LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 277,064.56
  LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBNI REA 3631/2012 27/08/2021 27/08/2058 299,603.39
  LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-3 CE 061/2001 IPCA RBNI REA 3631/2012 27/08/2021 27/08/2058 1,078,464.72
  LT 230 kV AQUIRAZ II /FORTALEZA CE LT 230 kV AQUIRAZ II /FORTALEZA C-2 CE RB FT LT 230 kV AQUIRAZ II /FORTALEZA C-1 CE 061/2001 IPCA RBNI REA 2823/2011 2/10/2020 2/10/2060 1,724,314.42
  LT 230 kV ARAPIRACA III /PENEDO AL LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2044 451,776.18
  LT 230 kV ARAPIRACA III /PENEDO AL LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 668,718.10
  LT 230 kV ARAPIRACA III /PENEDO AL LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 923,088.06
  LT 230 kV ARAPIRACA III /PENEDO AL LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,024,860.77
  LT 230 kV B. ESPERANCA /TERESINA PI LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,761,451.74
  LT 230 kV B. ESPERANCA /TERESINA PI LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,761,451.74
  LT 230 kV B. ESPERANCA /TERESINA PI LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,192,249.45
  LT 230 kV B. ESPERANCA /TERESINA PI LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 11,389,576.60
  LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO BA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBNI REA 10198/2021 19/06/2019 18/06/2047 1,163.27
  LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO BA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,328,337.50
  LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO BA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,214,000.85
  LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO BA LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,050,144.49
  LT 230 kV BANABUIU /ALEX CE LT 230 kV BANABUIU /ALEX C-1 CE RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBNI DSP 1183/2022 1/7/2022 30/06/2052 47,595.21
  LT 230 kV BANABUIU /ALEX CE LT 230 kV BANABUIU /ALEX C-1 CE RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,559,305.60
  LT 230 kV BANABUIU /ALEX CE LT 230 kV BANABUIU /ALEX C-1 CE RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,532,825.63
  LT 230 kV BANABUIU /ALEX CE LT 230 kV BANABUIU /ALEX C-1 CE RB FT LT 230 kV BANABUIU /ALEX C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,749,509.82
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RMEL REN 643/2014 19/04/2014 18/04/2051 28,323.24
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-1 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 231,631.43
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBNI REA 3631/2012 6/11/2020 6/11/2057 1,078,464.72
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-1 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE 061/2001 IPCA RBNI REA 2823/2011 2/10/2020 2/10/2060 1,724,314.42
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-1 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,438,321.70
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,445,209.61
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-3 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,176,337.02
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-1 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,365,821.33
  LT 230 kV BANABUIU /AQUIRAZ II CE LT 230 kV BANABUIU /AQUIRAZ II C-2 CE RB FT LT 230 kV BANABUIU /AQUIRAZ II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,375,329.30
  LT 230 kV BANABUIU /ICO CE LT 230 kV BANABUIU /ICO C-1 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBNI REA 1312/2008 13/11/2012 12/11/2051 229,731.34
  LT 230 kV BANABUIU /ICO CE LT 230 kV BANABUIU /ICO C-1 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,687,634.30
  LT 230 kV BANABUIU /ICO CE LT 230 kV BANABUIU /ICO C-1 CE RB FT LT 230 kV BANABUIU /ICO C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,329,584.13
  LT 230 kV BANABUIU /MOSSORO II CE/RN LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN 061/2001 IPCA RBNI REA 2173/2009 6/6/2016 5/6/2053 5,409,256.27
  LT 230 kV BANABUIU /RUSSAS II CE LT 230 kV BANABUIU /RUSSAS II C-1 CE RB FT LT 230 kV BANABUIU /RUSSAS II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,097,294.30
  LT 230 kV BANABUIU /RUSSAS II CE LT 230 kV BANABUIU /RUSSAS II C-1 CE RB FT LT 230 kV BANABUIU /RUSSAS II C-1 CE 061/2001 IPCA RBNI REA 2173/2009 10/9/2019 10/9/2059 3,222,437.39

 

86 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 230 kV BARREIRAS II /BARREIRAS BA LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBNI REA 9680/2021 19/11/2019 18/11/2047 51,715.90
  LT 230 kV BARREIRAS II /BARREIRAS BA LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 265,961.23
  LT 230 kV BARREIRAS II /BARREIRAS BA LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 367,128.75
  LT 230 kV BARREIRAS II /BARREIRAS BA LT 230 kV BARREIRAS II /BARREIRAS C-1 BA RB FT LT 230 kV BARREIRAS II /BARREIRAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 805,323.60
  LT 230 kV BOM NOME /MILAGRES PE/CE LT 230 kV BOM NOME /MILAGRES C-1 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,590,068.23
  LT 230 kV BOM NOME /MILAGRES PE/CE LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,593,867.68
  LT 230 kV BOM NOME /MILAGRES PE/CE LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,597,667.13
  LT 230 kV BOM NOME /MILAGRES PE/CE LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,200,150.15
  LT 230 kV BONGI /ACONORTE PE LT 230 kV BONGI /ACONORTE C-1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 136,780.06
  LT 230 kV BONGI /ACONORTE PE LT 230 kV BONGI /ACONORTE C-1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 188,809.07
  LT 230 kV BONGI /JOAIRAM PE LT 230 kV BONGI /JOAIRAM C-3 PE RB FT LT 230 kV BONGI /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,157.99
  LT 230 kV BONGI /JOAIRAM PE LT 230 kV BONGI /JOAIRAM C-2 PE RB FT LT 230 kV BONGI /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 115,157.99
  LT 230 kV BONGI /JOAIRAM PE LT 230 kV BONGI /JOAIRAM C-1 PE RB FT LT 230 kV BONGI /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 143,619.07
  LT 230 kV BROT.MACAUBAS /B.JESUS LAPA BA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042 715,464.33
  LT 230 kV BROT.MACAUBAS /B.JESUS LAPA BA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,716,483.23
  LT 230 kV BROT.MACAUBAS /B.JESUS LAPA BA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 7,890,944.50
  LT 230 kV BROT.MACAUBAS /B.JESUS LAPA BA LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA RB FT LT 230 kV BROT.MACAUBAS /B.JESUS LAPA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 17,309,360.36
  LT 230 kV BRUMADO II /IBICOARA BA LT 230 kV BRUMADO II /IBICOARA C-1 BA RB FT LT 230 kV BRUMADO II /IBICOARA C-1 BA 010/2007 IPCA RBL CC 010/2007 11/6/2007 11/6/2037 4,244,645.64
  LT 230 kV C.GRANDE II /COTEMINAS PB LT 230 kV C.GRANDE II /COTEMINAS C-1 PB RB FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 36,788.21
  LT 230 kV C.GRANDE II /COTEMINAS PB LT 230 kV C.GRANDE II /COTEMINAS C-1 PB RB FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 50,781.87
  LT 230 kV C.GRANDE II /COTEMINAS PB LT 230 kV C.GRANDE II /COTEMINAS C-1 PB RB FT LT 230 kV C.GRANDE II /COTEMINAS C-1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 111,393.72
  LT 230 kV C.GRANDE II /PARAISO PB/RN LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,770,853.94
  LT 230 kV C.GRANDE II /PARAISO PB/RN LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,784,349.02
  LT 230 kV C.GRANDE II /PARAISO PB/RN LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,444,459.23
  LT 230 kV C.GRANDE II /PARAISO PB/RN LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,463,087.62
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 37,334.42
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 51,535.85
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2050 63,622.65
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2050 63,622.65
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,012.53
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,546.13
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-2 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 113,047.63
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-3 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 227,135.95
  LT 230 kV C.GRANDE III /C.GRANDE II PB LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB RB FT LT 230 kV C.GRANDE III /C.GRANDE II C-1 PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 252,517.31
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2050 63,622.65
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBNI REA 10226/2021 27/01/2017 26/01/2050 63,622.65
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBNI REA 10141/2021 15/08/2016 15/08/2048 173,631.20
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBNI REA 3208/2011 6/1/2020 6/1/2060 1,362,874.91
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,409,075.09
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,945,065.33
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,558,099.01
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,531,160.07
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-2 PB/RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,266,642.19
  LT 230 kV C.GRANDE III /EXTREMOZ II PB/RN LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN RB FT LT 230 kV C.GRANDE III /EXTREMOZ II C-1 PB/RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,745,856.30
  LT 230 kV CAMACARI II /BRAS.C.SODA BA LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 164,136.08
  LT 230 kV CAMACARI II /BRAS.C.SODA BA LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 226,570.88
  LT 230 kV CAMACARI II /BRAS.C.SODA BA LT 230 kV CAMACARI II /BRAS.C.SODA C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 496,999.70
  LT 230 kV CAMACARI II /BRASKEM BA LT 230 kV CAMACARI II /BRASKEM C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 136,780.06
  LT 230 kV CAMACARI II /BRASKEM BA LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 136,780.06
  LT 230 kV CAMACARI II /BRASKEM BA LT 230 kV CAMACARI II /BRASKEM C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 188,809.07
  LT 230 kV CAMACARI II /BRASKEM BA LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 188,809.07
  LT 230 kV CAMACARI II /BRASKEM BA LT 230 kV CAMACARI II /BRASKEM C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 414,166.42
  LT 230 kV CAMACARI II /CARAIBAS BA LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 79,028.48
  LT 230 kV CAMACARI II /CARAIBAS BA LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 109,089.69
  LT 230 kV CAMACARI II /CARAIBAS BA LT 230 kV CAMACARI II /CARAIBAS C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 239,296.16
  LT 230 kV CAMACARI II /COTEGIPE BA LT 230 kV CAMACARI II /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 6258/2017 27/11/2020 27/11/2048 344,720.76
  LT 230 kV CAMACARI II /COTEGIPE BA LT 230 kV CAMACARI II /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 491,078.42
  LT 230 kV CAMACARI II /COTEGIPE BA LT 230 kV CAMACARI II /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI II /COTEGIPE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 677,877.01
  LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2051 121,209.89
  LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,255,042.12
  LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,255,042.12
  LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,732,440.62
  LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,732,440.62
  LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,800,234.43
  LT 230 kV CAMACARI II /G.MANGABEIRA BA LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA RB FT LT 230 kV CAMACARI II /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,800,234.43
  LT 230 kV CAMACARI II /MATATU BA LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBNI REA 7761/2019 1/1/2021 31/12/2057 528,646.90
  LT 230 kV CAMACARI II /MATATU BA LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 892,869.86
  LT 230 kV CAMACARI II /PITUACU BA LT 230 kV CAMACARI II /PITUACU C-1 BA RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 587,785.56
  LT 230 kV CAMACARI II /PITUACU BA LT 230 kV CAMACARI II /PITUACU C-1 BA RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 811,370.04
  LT 230 kV CAMACARI II /PITUACU BA LT 230 kV CAMACARI II /PITUACU C-1 BA RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,779,799.16
  LT 230 kV CAMACARI IV /COTEGIPE BA LT 230 kV CAMACARI IV /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 480,629.94
  LT 230 kV CAMACARI IV /COTEGIPE BA LT 230 kV CAMACARI IV /COTEGIPE C-1 BA RB FT LT 230 kV CAMACARI IV /COTEGIPE C-1 BA 061/2001 IPCA RBNI REA 2891/2011 2/6/2014 1/6/2051 814,747.77
  LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 316,684.46
  LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 316,684.46
  LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 437,146.31
  LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 437,146.31
  LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-2 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-2 BA 061/2001 IPCA RBNI REA 2891/2011 11/8/2014 10/8/2054 1,272,850.63
  LT 230 kV CAMACARI IV /JACARACANGA BA LT 230 kV CAMACARI IV /JACARACANGA C-1 BA RB FT LT 230 kV CAMACARI IV /JACARACANGA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 1/9/2014 31/08/2054 1,274,265.85
  LT 230 kV CAMACARI IV /PITUACU BA LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2891/2011 5/5/2014 4/5/2051 446,181.74
  LT 230 kV CAMACARI IV /PITUACU BA LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 587,785.56
  LT 230 kV CAMACARI IV /PITUACU BA LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 811,370.04
  LT 230 kV CAMACARI IV /PITUACU BA LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,779,799.16
  LT 230 kV CAMPO FORMOSO /OUROLANDIA II BA LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA RB FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBNI REA 9690/2021 4/6/2019 3/6/2047 264,641.20
  LT 230 kV CAMPO FORMOSO /OUROLANDIA II BA LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA RB FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,640,133.61
  LT 230 kV CAMPO FORMOSO /OUROLANDIA II BA LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA RB FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,264,014.91
  LT 230 kV CAMPO FORMOSO /OUROLANDIA II BA LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA RB FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,966,281.28

 

87 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBNI REA 2891/2011 13/10/2014 12/10/2054 196,909.96
  LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBNI REA 2891/2011 5/11/2014 4/11/2054 197,143.71
  LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBNI REA 5931/2016 12/5/2022 12/5/2051 304,090.31
  LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBNI REA 5931/2016 12/5/2022 12/5/2050 390,216.27
  LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 522,423.85
  LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-1 BA RB FT LT 230 kV CATU /CAMACARI IV C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 522,423.85
  LT 230 kV CATU /CAMACARI IV BA LT 230 kV CATU /CAMACARI IV C-2 BA RB FT LT 230 kV CATU /CAMACARI IV C-2 BA 061/2001 IPCA RBNI REA 7761/2019 18/11/2017 17/11/2054 538,599.94
  LT 230 kV CATU /G.MANGABEIRA BA LT 230 kV CATU /G.MANGABEIRA C-1 BA RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNIA REA 2173/2009     2,253,371.08
  LT 230 kV CATU /G.MANGABEIRA BA LT 230 kV CATU /G.MANGABEIRA C-1 BA RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBNI REA 2891/2011 30/11/2015 29/11/2051 33,850.09
  LT 230 kV CATU /G.MANGABEIRA BA LT 230 kV CATU /G.MANGABEIRA C-1 BA RB FT LT 230 kV CATU /G.MANGABEIRA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,466,586.23
  LT 230 kV CAUIPE /FORTALEZA II CE LT 230 kV CAUIPE /FORTALEZA II C-2 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 869,682.71
  LT 230 kV CAUIPE /FORTALEZA II CE LT 230 kV CAUIPE /FORTALEZA II C-1 CE RB FT LT 230 kV CAUIPE /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 911,667.40
  LT 230 kV CAUIPE /MARACANAU CE LT 230 kV CAUIPE /MARACANAU C-1 CE RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 721,894.78
  LT 230 kV CAUIPE /MARACANAU CE LT 230 kV CAUIPE /MARACANAU C-1 CE RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 996,492.32
  LT 230 kV CAUIPE /MARACANAU CE LT 230 kV CAUIPE /MARACANAU C-1 CE RB FT LT 230 kV CAUIPE /MARACANAU C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,185,878.34
  LT 230 kV CAUIPE /SOBRAL II CE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 20,679.03
  LT 230 kV CAUIPE /SOBRAL II CE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBNI REA 2460/2010 21/11/2013 20/11/2051 77,779.51
  LT 230 kV CAUIPE /SOBRAL II CE LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,370,108.78
  LT 230 kV CEARA MIRIM II /EXTREMOZ II RN LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 874,286.19
  LT 230 kV CEARA MIRIM II /EXTREMOZ II RN LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN RB FT LT 230 kV CEARA MIRIM II /EXTREMOZ II C-2 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040 885,698.98
  LT 230 kV CEARA MIRIM II /JOAO CAMARA II RN LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN RB FT LT 230 kV CEARA MIRIM II /JOAO CAMARA II C-1 RN 019/2010 IPCA RBL CC 019/2010 17/02/2014 23/11/2040 2,745,666.83
  LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 2,720.93
  LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 14,965.09
  LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RMEL REN 443/2011 24/09/2017 23/09/2074 56,066.70
  LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RMEL REN 443/2011 1/10/2017 30/09/2074 56,082.92
  LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-1 BA RB FT LT 230 kV CIC. DANTAS /CATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,812,744.26
  LT 230 kV CIC. DANTAS /CATU BA LT 230 kV CIC. DANTAS /CATU C-2 BA RB FT LT 230 kV CIC. DANTAS /CATU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,824,142.60
  LT 230 kV COTEGIPE /JACARACANGA BA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RBNI REA 3208/2011 26/09/2021 26/09/2061 212,675.85
  LT 230 kV COTEGIPE /JACARACANGA BA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 317,633.70
  LT 230 kV COTEGIPE /JACARACANGA BA LT 230 kV COTEGIPE /JACARACANGA C-1 BA RB FT LT 230 kV COTEGIPE /JACARACANGA C-1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2048 327,592.23
  LT 230 kV COTEGIPE /MATATU BA LT 230 kV COTEGIPE /MATATU C-1 BA RB FT LT 230 kV COTEGIPE /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 626,908.62
  LT 230 kV COTEGIPE /MATATU BA LT 230 kV COTEGIPE /MATATU C-1 BA RB FT LT 230 kV COTEGIPE /MATATU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 865,374.91
  LT 230 kV COTEMINAS /LAGOA DO CARRO PB/PE LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE 061/2001 IPCA RBNI REA 9687/2021 22/10/2020 21/10/2048 156,502.89
  LT 230 kV COTEMINAS /LAGOA DO CARRO PB/PE LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,360,874.67
  LT 230 kV COTEMINAS /LAGOA DO CARRO PB/PE LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,878,530.23
  LT 230 kV COTEMINAS /LAGOA DO CARRO PB/PE LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE RB FT LT 230 kV COTEMINAS /LAGOA DO CARRO C-1 PB/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,120,692.60
  LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 127,753.39
  LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 127,753.39
  LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 176,348.79
  LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 176,348.79
  LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 386,833.90
  LT 230 kV DELM. GOUVEIA /FORTALEZA II CE LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE RB FT LT 230 kV DELM. GOUVEIA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 386,833.90
  LT 230 kV EUNAPOLIS /TEIX. FREITAS II BA LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 3,366,524.03
  LT 230 kV EUNAPOLIS /TEIX. FREITAS II BA LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA 018/2009 IPCA RBL CC 018/2009 3/8/2009 3/8/2039 8,771,080.18
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBNI DSP 1073/2022 1/7/2022 30/06/2058 19,874.56
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBNI DSP 1073/2022 1/7/2022 30/06/2058 19,874.56
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,005.01
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 41,418.45
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 90,854.38
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBNI REA 10141/2021 15/08/2016 15/08/2048 173,631.20
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,141,350.82
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBNI REA 3208/2011 6/1/2020 6/1/2060 1,362,874.91
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,575,502.92
  LT 230 kV EXTREMOZ II /NATAL III RN LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,455,980.18
  LT 230 kV FLORESTA II /BOM NOME PE LT 230 kV FLORESTA II /BOM NOME C-1 PE RB FT LT 230 kV FLORESTA II /BOM NOME C-1 PE 061/2001 IPCA RBNI REA 10264/2021 5/4/2019 4/4/2047 4,956.39
  LT 230 kV FLORESTA II /BOM NOME PE LT 230 kV FLORESTA II /BOM NOME C-1 PE RB FT LT 230 kV FLORESTA II /BOM NOME C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,746,883.03
  LT 230 kV FORTALEZA /FORTALEZA II CE LT 230 kV FORTALEZA /FORTALEZA II C-3 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,408.92
  LT 230 kV FORTALEZA /FORTALEZA II CE LT 230 kV FORTALEZA /FORTALEZA II C-2 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,408.92
  LT 230 kV FORTALEZA /FORTALEZA II CE LT 230 kV FORTALEZA /FORTALEZA II C-1 CE RB FT LT 230 kV FORTALEZA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,408.92
  LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 453,584.52
  LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 453,584.52
  LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 626,121.01
  LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 626,121.01
  LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,373,441.95
  LT 230 kV FORTALEZA II /PICI II CE LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,373,441.95
  LT 230 kV FUNIL /ITABUNA III BA LT 230 kV FUNIL /ITABUNA III C-1 BA RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBNI DSP 1270/2022 1/7/2022 30/06/2056 338,874.48
  LT 230 kV FUNIL /ITABUNA III BA LT 230 kV FUNIL /ITABUNA III C-1 BA RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,021,127.46
  LT 230 kV FUNIL /ITABUNA III BA LT 230 kV FUNIL /ITABUNA III C-1 BA RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,409,548.46
  LT 230 kV FUNIL /ITABUNA III BA LT 230 kV FUNIL /ITABUNA III C-1 BA RB FT LT 230 kV FUNIL /ITABUNA III C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,091,947.01
  LT 230 kV FUNIL /ITAPEBI BA LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,970,416.31
  LT 230 kV FUNIL /ITAPEBI BA LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,100,316.45
  LT 230 kV FUNIL /ITAPEBI BA LT 230 kV FUNIL /ITAPEBI C-1 BA RB FT LT 230 kV FUNIL /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 8,994,342.19
  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 371,114.61
  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 372,764.00
  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 491,078.42
  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 512,280.83
  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 514,557.63
  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBNI REA 7977/2019 22/10/2021 22/10/2050 791,489.14
  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,123,725.24
  LT 230 kV G.MANGABEIRA /SAPEACU BA LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,128,719.57
  LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-3 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE 061/2001 IPCA RBNI REA 5654/2016 15/12/2017 14/12/2050 58,027.28
  LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-2 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-2 PE 061/2001 IPCA RBNI REA 5824/2016 16/09/2019 16/09/2048 91,635.95
  LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-1 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE 061/2001 IPCA RBNI REA 5824/2016 16/09/2019 16/09/2048 91,635.95
  LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-2 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 224,917.94
  LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-1 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 224,917.94
  LT 230 kV GARANHUNS II /ANGELIM PE LT 230 kV GARANHUNS II /ANGELIM C-3 PE RB FT LT 230 kV GARANHUNS II /ANGELIM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 303,955.70

 

88 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 230 kV GOIANINHA /C.GRANDE II PE/PB LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBNI DSP 386/2021 16/11/2021 15/11/2058 478,336.70
  LT 230 kV GOIANINHA /C.GRANDE II PE/PB LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBNI REA 5745/2016 21/10/2021 21/10/2050 1,070,179.65
  LT 230 kV GOIANINHA /C.GRANDE II PE/PB LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB RB FT LT 230 kV GOIANINHA /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,886,425.04
  LT 230 kV GOIANINHA /MUSSURE II PE/PB LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB RB FT LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 758,723.20
  LT 230 kV GOIANINHA /MUSSURE II PE/PB LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB RB FT LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,047,329.69
  LT 230 kV GOIANINHA /SANTA RITA II PE/PB LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB 061/2001 IPCA RBNI REA 10199/2021 17/05/2021 17/05/2054 120,944.50
  LT 230 kV GOIANINHA /SANTA RITA II PE/PB LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 669,461.64
  LT 230 kV GOIANINHA /SANTA RITA II PE/PB LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 924,114.44
  LT 230 kV IBIAPINA II /SOBRAL II CE LT 230 kV IBIAPINA II /SOBRAL II C-1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBNI REA 10142/2021 10/2/2021 10/2/2054 97,396.34
  LT 230 kV IBIAPINA II /SOBRAL II CE LT 230 kV IBIAPINA II /SOBRAL II C-1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,737,208.88
  LT 230 kV ICO /MILAGRES CE LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBNI REA 1312/2008 13/11/2012 12/11/2052 74,894.75
  LT 230 kV ICO /MILAGRES CE LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,687,634.30
  LT 230 kV ICO /MILAGRES CE LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,329,584.13
  LT 230 kV IGAPORA II /B.J.LAPA II BA LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA RB FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA 020/2010 IPCA RBNI REA 3460/2012 2/6/2014 2/6/2054 128,308.28
  LT 230 kV IGAPORA II /B.J.LAPA II BA LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA RB FT LT 230 kV IGAPORA II /B.J.LAPA II C-1 BA 020/2010 IPCA RBL CC 020/2010 26/06/2014 23/11/2040 4,045,039.98
  LT 230 kV IGAPORA II /IGAPORA III BA LT 230 kV IGAPORA II /IGAPORA III C-2 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-2 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 143,542.71
  LT 230 kV IGAPORA II /IGAPORA III BA LT 230 kV IGAPORA II /IGAPORA III C-1 BA RB FT LT 230 kV IGAPORA II /IGAPORA III C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 143,542.71
  LT 230 kV IGAPORA III /PINDAI II BA LT 230 kV IGAPORA III /PINDAI II C-1 BA RB FT LT 230 kV IGAPORA III /PINDAI II C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 3,301,466.90
  LT 230 kV IRECE /BROT.MACAUBAS BA LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RMEL REN 643/2014 3/6/2014 2/6/2039 534,959.64
  LT 230 kV IRECE /BROT.MACAUBAS BA LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBNI REA 4629/2014 27/09/2013 31/12/2042 715,464.33
  LT 230 kV IRECE /BROT.MACAUBAS BA LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,262,353.79
  LT 230 kV IRECE /BROT.MACAUBAS BA LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,122,917.97
  LT 230 kV IRECE /BROT.MACAUBAS BA LT 230 kV IRECE /BROT.MACAUBAS C-1 BA RB FT LT 230 kV IRECE /BROT.MACAUBAS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,850,347.56
  LT 230 kV ITABAIANA /ITABAIANINHA SE LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBNI REA 3817/2013 10/4/2017 9/4/2053 632,373.58
  LT 230 kV ITABAIANA /ITABAIANINHA SE LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE RB FT LT 230 kV ITABAIANA /ITABAIANINHA C-1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,458,987.34
  LT 230 kV ITABAIANA /JARDIM SE LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 659,759.30
  LT 230 kV ITABAIANA /JARDIM SE LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 659,759.30
  LT 230 kV ITABAIANA /JARDIM SE LT 230 kV ITABAIANA /JARDIM C-2 SE RB FT LT 230 kV ITABAIANA /JARDIM C-2 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 910,721.47
  LT 230 kV ITABAIANA /JARDIM SE LT 230 kV ITABAIANA /JARDIM C-1 SE RB FT LT 230 kV ITABAIANA /JARDIM C-1 SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 910,721.47
  LT 230 kV ITABAIANINHA /CATU SE/BA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RMEL REN 643/2014 28/07/2014 27/07/2047 176,577.13
  LT 230 kV ITABAIANINHA /CATU SE/BA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,733,701.54
  LT 230 kV ITABAIANINHA /CATU SE/BA LT 230 kV ITABAIANINHA /CATU C-1 SE/BA RB FT LT 230 kV ITABAIANINHA /CATU C-1 SE/BA 061/2001 IPCA RBNI REA 4407/2013 23/12/2021 23/12/2058 3,164,275.88
  LT 230 kV ITABUNA III /ITAPEBI BA LT 230 kV ITABUNA III /ITAPEBI C-1 BA RB FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA 061/2001 IPCA RBNI DSP 1270/2022 1/7/2022 30/06/2056 338,874.48
  LT 230 kV ITABUNA III /ITAPEBI BA LT 230 kV ITABUNA III /ITAPEBI C-1 BA RB FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,949,288.84
  LT 230 kV ITABUNA III /ITAPEBI BA LT 230 kV ITABUNA III /ITAPEBI C-1 BA RB FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,690,767.99
  LT 230 kV ITABUNA III /ITAPEBI BA LT 230 kV ITABUNA III /ITAPEBI C-1 BA RB FT LT 230 kV ITABUNA III /ITAPEBI C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,902,395.18
  LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 704,742.89
  LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 704,742.89
  LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 972,816.12
  LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 972,816.12
  LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,133,942.87
  LT 230 kV ITAPEBI /EUNAPOLIS BA LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA RB FT LT 230 kV ITAPEBI /EUNAPOLIS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,133,942.87
  LT 230 kV JABOATAO II /PIRAPAMA II PE LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RBNI REA 10092/2021 11/3/2021 11/3/2056 279,444.10
  LT 230 kV JABOATAO II /PIRAPAMA II PE LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 315,035.07
  LT 230 kV JABOATAO II /PIRAPAMA II PE LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 434,869.50
  LT 230 kV JACARACANGA /ALCAN BA LT 230 kV JACARACANGA /ALCAN C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 42,606.95
  LT 230 kV JACARACANGA /ALCAN BA LT 230 kV JACARACANGA /ALCAN C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 58,813.97
  LT 230 kV JACARACANGA /ALCAN BA LT 230 kV JACARACANGA /ALCAN C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 129,012.72
  LT 230 kV JACARACANGA /DOW QUIMICA BA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 177,814.08
  LT 230 kV JACARACANGA /DOW QUIMICA BA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 180,093.75
  LT 230 kV JACARACANGA /DOW QUIMICA BA LT 230 kV JACARACANGA /DOW QUIMICA C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 245,451.79
  LT 230 kV JACARACANGA /DOW QUIMICA BA LT 230 kV JACARACANGA /DOW QUIMICA C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 248,598.61
  LT 230 kV JAGUARARI-SE /SR.BONFIM II BA LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2051 80,839.51
  LT 230 kV JAGUARARI-SE /SR.BONFIM II BA LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,380,295.80
  LT 230 kV JAGUARARI-SE /SR.BONFIM II BA LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,905,338.84
  LT 230 kV JUAZEIRO II /JAGUARARI-SE BA LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,196,963.95
  LT 230 kV JUAZEIRO II /JAGUARARI-SE BA LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA RB FT LT 230 kV JUAZEIRO II /JAGUARARI-SE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,652,270.41
  LT 230 kV JUAZEIRO II /SR.BONFIM II BA LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,228,187.09
  LT 230 kV JUAZEIRO II /SR.BONFIM II BA LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,075,754.79
  LT 230 kV LAGOA DO CARRO /PAU FERRO PE LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE 061/2001 IPCA RBNI REA 9687/2021 22/10/2020 21/10/2048 156,502.89
  LT 230 kV LAGOA DO CARRO /PAU FERRO PE LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 512,945.07
  LT 230 kV LAGOA DO CARRO /PAU FERRO PE LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 708,061.39
  LT 230 kV LAGOA DO CARRO /PAU FERRO PE LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,553,184.13
  LT 230 kV MARACANAU /FORTALEZA II CE LT 230 kV MARACANAU /FORTALEZA II C-1 CE RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 379,944.62
  LT 230 kV MARACANAU /FORTALEZA II CE LT 230 kV MARACANAU /FORTALEZA II C-1 CE RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 524,469.64
  LT 230 kV MARACANAU /FORTALEZA II CE LT 230 kV MARACANAU /FORTALEZA II C-1 CE RB FT LT 230 kV MARACANAU /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,150,462.28
  LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 427,194.15
  LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 427,194.15
  LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 589,692.15
  LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 589,692.15
  LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,293,532.60
  LT 230 kV MESSIAS /MACEIO AL LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,293,532.60
  LT 230 kV MESSIAS /MACEIO II AL LT 230 kV MESSIAS /MACEIO II C-2 AL RB FT LT 230 kV MESSIAS /MACEIO II C-2 AL 005/2012 IPCA RBL CC 005/2012 1/3/2019 10/5/2042 880,638.70
  LT 230 kV MESSIAS /MACEIO II AL LT 230 kV MESSIAS /MACEIO II C-1 AL RB FT LT 230 kV MESSIAS /MACEIO II C-1 AL 005/2012 IPCA RBL CC 005/2012 1/3/2019 10/5/2042 880,638.70
  LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-3 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 208,723.85
  LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-2 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 208,723.85
  LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 271,280.46
  LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-3 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 288,119.16
  LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-2 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 288,119.16
  LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 374,471.32
  LT 230 kV MESSIAS /RIO LARGO II AL LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 821,430.07
  LT 230 kV MILAGRES /BANABUIU CE LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RMEL REN 643/2014 19/04/2014 18/04/2051 3,540.40
  LT 230 kV MILAGRES /BANABUIU CE LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RMEL REN 643/2014 19/04/2014 18/04/2051 3,540.40
  LT 230 kV MILAGRES /BANABUIU CE LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,375,268.61
  LT 230 kV MILAGRES /BANABUIU CE LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,291,474.48
  LT 230 kV MILAGRES /BANABUIU CE LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,659,168.26

 

89 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 230 kV MILAGRES /COREMAS CE/PB LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,268,269.38
  LT 230 kV MILAGRES /COREMAS CE/PB LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,131,083.76
  LT 230 kV MILAGRES /COREMAS CE/PB LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,868,259.83
  LT 230 kV MILAGRES /COREMAS CE/PB LT 230 kV MILAGRES /COREMAS C-2 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-2 CE/PB 008/2005 IGPM RBL CC 008/2005 25/09/2009 4/3/2035 12,425,323.60
  LT 230 kV MILAGRES /TAUA II CE LT 230 kV MILAGRES /TAUA II C-1 CE RB FT LT 230 kV MILAGRES /TAUA II C-1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 4/3/2035 13,588,962.61
  LT 230 kV MORRO CHAPEU II /IRECE BA LT 230 kV MORRO CHAPEU II /IRECE C-1 BA RB FT LT 230 kV MORRO CHAPEU II /IRECE C-1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041 2,288,972.85
  LT 230 kV MOSSORO II /ACU III RN LT 230 kV MOSSORO II /ACU III C-2 RN RB FT LT 230 kV MOSSORO II /ACU III C-2 RN 019/2010 IPCA RBNI DSP 1269/2022 1/7/2022 30/06/2056 38,297.90
  LT 230 kV MOSSORO II /ACU III RN LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBNI DSP 1307/2022 1/7/2021 30/06/2056 44,456.26
  LT 230 kV MOSSORO II /ACU III RN LT 230 kV MOSSORO II /ACU III C-2 RN RB FT LT 230 kV MOSSORO II /ACU III C-2 RN 019/2010 IPCA RBNI REA 4407/2013 13/12/2021 13/12/2058 93,223.06
  LT 230 kV MOSSORO II /ACU III RN LT 230 kV MOSSORO II /ACU III C-2 RN RB FT LT 230 kV MOSSORO II /ACU III C-2 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040 528,122.45
  LT 230 kV MOSSORO II /ACU III RN LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,145,533.03
  LT 230 kV MOSSORO II /ACU III RN LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,581,275.97
  LT 230 kV MOSSORO II /ACU III RN LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,468,643.78
  LT 230 kV MOSSORO IV /MOSSORO II RN LT 230 kV MOSSORO IV /MOSSORO II C-1 RN RB FT LT 230 kV MOSSORO IV /MOSSORO II C-1 RN 018/2012 IPCA RBL CC 018/2012 28/10/2017 1/6/2042 1,743,826.53
  LT 230 kV N.S.SOCORRO /FAFEN SE LT 230 kV N.S.SOCORRO /FAFEN C-1 SE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 284,958.46
  LT 230 kV N.S.SOCORRO /FAFEN SE LT 230 kV N.S.SOCORRO /FAFEN C-1 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 393,352.23
  LT 230 kV N.S.SOCORRO /FAFEN SE LT 230 kV N.S.SOCORRO /FAFEN C-1 SE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 862,846.71
  LT 230 kV N.S.SOCORRO /JARDIM SE LT 230 kV N.S.SOCORRO /JARDIM C-1 SE RB FT LT 230 kV N.S.SOCORRO /JARDIM C-1 SE 005/2012 IPCA RBNI DSP 1080/2022 1/7/2022 30/06/2057 17,380.72
  LT 230 kV N.S.SOCORRO /JARDIM SE LT 230 kV N.S.SOCORRO /JARDIM C-2 SE RB FT LT 230 kV N.S.SOCORRO /JARDIM C-2 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/5/2042 122,302.40
  LT 230 kV N.S.SOCORRO /JARDIM SE LT 230 kV N.S.SOCORRO /JARDIM C-1 SE RB FT LT 230 kV N.S.SOCORRO /JARDIM C-1 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/5/2042 122,302.40
  LT 230 kV N.S.SOCORRO /PENEDO SE/AL LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL RB FT LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL 005/2008 IPCA RBNI DSP 1414/2022 1/7/2022 30/06/2057 85,930.08
  LT 230 kV N.S.SOCORRO /PENEDO SE/AL LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL RB FT LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 3,507,508.21
  LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-2 RN RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBNI DSP 1073/2022 1/7/2022 30/06/2058 19,874.56
  LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBNI DSP 1073/2022 1/7/2022 30/06/2058 19,874.56
  LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-2 RN RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 225,037.58
  LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 225,037.58
  LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-2 RN RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 310,638.37
  LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 310,638.37
  LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-2 RN RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 681,407.86
  LT 230 kV NATAL III /NATAL II RN LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 681,407.86
  LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) BA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-2 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS  /CATU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,939.28
  LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) BA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-1 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS  /CATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,939.28
  LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) BA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-2 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS  /CATU C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 6,818.11
  LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) BA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-1 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS  /CATU C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 6,818.11
  LT 230 kV OUROLANDIA II /IRECE BA LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBNI REA 9690/2021 4/6/2019 3/6/2047 264,641.20
  LT 230 kV OUROLANDIA II /IRECE BA LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,424,792.32
  LT 230 kV OUROLANDIA II /IRECE BA LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,966,761.16
  LT 230 kV OUROLANDIA II /IRECE BA LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,314,233.56
  LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL RB FT LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 27,166.04
  LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL RB FT LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 34,574.96
  LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL RB FT LT 230 kV P. AFONSO IV /P.AFONSO III C-1 BA/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 37,499.58
  LT 230 kV P. AFONSO IV /P.AFONSO III BA/AL LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL RB FT LT 230 kV P. AFONSO IV /P.AFONSO III C-2 BA/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 47,726.74
  LT 230 kV P.AFONSO III /BOM NOME AL/PE LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 339,912.94
  LT 230 kV P.AFONSO III /BOM NOME AL/PE LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,244,727.05
  LT 230 kV P.AFONSO III /BOM NOME AL/PE LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,478,970.74
  LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 23,617.63
  LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 26,175.30
  LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,541,829.51
  LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,549,428.40
  LT 230 kV P.AFONSO III /CIC. DANTAS AL/BA LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RBNI REA 2173/2009 4/9/2017 3/9/2053 3,217,324.66
  LT 230 kV P.AFONSO III /FLORESTA II AL/PE LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE 061/2001 IPCA RBNI REA 10264/2021 5/4/2019 4/4/2047 4,956.39
  LT 230 kV P.AFONSO III /FLORESTA II AL/PE LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,495,944.30
  LT 230 kV P.AFONSO III /GARANHUNS II AL/PE LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE 061/2001 IPCA RBNI REA 5654/2016 15/12/2017 14/12/2050 1,055,762.59
  LT 230 kV P.AFONSO III /GARANHUNS II AL/PE LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,076,877.47
  LT 230 kV P.AFONSO III /GARANHUNS II AL/PE LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,076,877.47
  LT 230 kV P.AFONSO III /GARANHUNS II AL/PE LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,894,432.35
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 10,393.94
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RMEL REN 643/2014 24/11/2014 23/11/2051 10,393.94
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBNI REA 2823/2011 13/08/2013 12/8/2046 176,880.20
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBNI REA 2823/2011 13/08/2013 12/8/2046 176,880.20
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,436,611.05
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,436,611.05
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,363,459.99
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,363,459.99
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,377,993.97
  LT 230 kV P.AFONSO III /ITABAIANA AL/SE LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,377,993.97
  LT 230 kV P.AFONSO III /SANTANA II AL LT 230 kV P.AFONSO III /SANTANA II C-1 AL RB FT LT 230 kV P.AFONSO III /SANTANA II C-1 AL 061/2001 IPCA RBNI DSP 1019/2022 1/7/2022 30/06/2057 325,081.47
  LT 230 kV P.AFONSO III /SANTANA II AL LT 230 kV P.AFONSO III /SANTANA II C-1 AL RB FT LT 230 kV P.AFONSO III /SANTANA II C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,634,521.75
  LT 230 kV P.AFONSO III /TACARUTU AL/PE LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RBNI REA 7026/2018 1/7/2018 14/12/2044 82,029.86
  LT 230 kV P.AFONSO III /TACARUTU AL/PE LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 830,188.26
  LT 230 kV P.AFONSO III /USINA PA-I AL/BA LT 230 kV P.AFONSO III /USINA PA-I C-2 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 14,817.84
  LT 230 kV P.AFONSO III /USINA PA-I AL/BA LT 230 kV P.AFONSO III /USINA PA-I C-1 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 14,817.84
  LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-3 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 14,817.84
  LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-2 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 14,817.84
  LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-1 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 14,817.84
  LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA RB FT LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 17,287.48
  LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA RB FT LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 17,287.48
  LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-2 AL/BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 20,454.32
  LT 230 kV P.AFONSO III /USINA PA-II AL/BA LT 230 kV P.AFONSO III /USINA PA-II C-2 AL/BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 44,868.03
  LT 230 kV P.AFONSO III /USINA PA-III AL/BA LT 230 kV P.AFONSO III /USINA PA-III C-4 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 14,817.84
  LT 230 kV P.AFONSO III /USINA PA-III AL/BA LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 14,817.84
  LT 230 kV P.AFONSO III /USINA PA-III AL/BA LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 14,817.84
  LT 230 kV P.AFONSO III /USINA PA-III AL/BA LT 230 kV P.AFONSO III /USINA PA-III C-1 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 14,817.84
  LT 230 kV P.AFONSO III /ZEBU AL LT 230 kV P.AFONSO III /ZEBU C-2 AL RB FT LT 230 kV P.AFONSO III /ZEBU C-2 AL/BA 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 203,221.61
  LT 230 kV P.AFONSO III /ZEBU AL LT 230 kV P.AFONSO III /ZEBU C-1 AL RB FT LT 230 kV P.AFONSO III /ZEBU C-1 AL 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 203,221.61
  LT 230 kV PARAISO /ACU II RN LT 230 kV PARAISO /ACU II C-3 RN RB FT LT 230 kV PARAISO /ACU II C-3 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040 3,530,383.42

 

90 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 230 kV PARAISO /ACU II RN LT 230 kV PARAISO /ACU II C-2 RN RB FT LT 230 kV PARAISO /ACU II C-2 RN 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 5,383,440.63
  LT 230 kV PARAISO /LAGOA NOVA II RN LT 230 kV PARAISO /LAGOA NOVA II C-1 RN RB FT LT 230 kV PARAISO /LAGOA NOVA II C-2 RN 010/2011 IPCA RBL CC 010/2011 13/10/2011 13/10/2041 4,157,097.80
  LT 230 kV PARAISO /NATAL II RN LT 230 kV PARAISO /NATAL II C-1 RN RB FT LT 230 kV PARAISO /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,442,473.74
  LT 230 kV PARAISO /NATAL II RN LT 230 kV PARAISO /NATAL II C-2 RN RB FT LT 230 kV PARAISO /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,457,468.27
  LT 230 kV PARAISO /NATAL II RN LT 230 kV PARAISO /NATAL II C-1 RN RB FT LT 230 kV PARAISO /NATAL II C-1 RN 061/2001 IPCA RBNI REA 7761/2019 31/03/2017 30/03/2054 1,608,897.49
  LT 230 kV PARAISO /NATAL II RN LT 230 kV PARAISO /NATAL II C-1 RN RB FT LT 230 kV PARAISO /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,991,168.31
  LT 230 kV PARAISO /NATAL II RN LT 230 kV PARAISO /NATAL II C-2 RN RB FT LT 230 kV PARAISO /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,011,866.53
  LT 230 kV PAU FERRO /C.GRANDE II PE/PB LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,887,811.27
  LT 230 kV PAU FERRO /GOIANINHA PE LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 664,903.08
  LT 230 kV PAU FERRO /GOIANINHA PE LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBNI REA 3677/2012 20/05/2019 20/05/2056 679,300.72
  LT 230 kV PAU FERRO /GOIANINHA PE LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 917,821.87
  LT 230 kV PAU FERRO /GOIANINHA PE LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,013,308.99
  LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 286,858.19
  LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBNI REA 3677/2012 20/05/2019 20/05/2056 325,050.20
  LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 395,974.58
  LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 868,599.02
  LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBNI REA 3677/2012 20/05/2019 20/05/2056 1,411,061.31
  LT 230 kV PAU FERRO /MIRUEIRA II PE LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RBNI REA 3677/2012 12/4/2016 11/4/2053 1,651,239.62
  LT 230 kV PAU FERRO /SANTA RITA II PE/PB LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB RB FT LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 3/8/2039 7,361,945.38
  LT 230 kV PICOS /TAUA II PI/CE LT 230 kV PICOS /TAUA II C-1 PI/CE RB FT LT 230 kV PICOS /TAUA II C-1 PI/CE 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 7,177,920.85
  LT 230 kV PIRAPAMA II /SUAPE II PE LT 230 kV PIRAPAMA II /SUAPE II C-2 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 1,071,282.44
  LT 230 kV PIRAPAMA II /SUAPE II PE LT 230 kV PIRAPAMA II /SUAPE II C-1 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 1,071,282.44
  LT 230 kV PIRIPIRI /IBIAPINA II PI/CE LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE RB FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE 061/2001 IPCA RBNI REA 10142/2021 10/2/2021 10/2/2054 97,396.34
  LT 230 kV PIRIPIRI /IBIAPINA II PI/CE LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE RB FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,442,927.59
  LT 230 kV PITUACU /NARANDIBA BA LT 230 kV PITUACU /NARANDIBA C-2 BA RB FT LT 230 kV PITUACU /NARANDIBA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 70,174.40
  LT 230 kV PITUACU /NARANDIBA BA LT 230 kV PITUACU /NARANDIBA C-1 BA RB FT LT 230 kV PITUACU /NARANDIBA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 70,174.40
  LT 230 kV PITUACU /NARANDIBA BA LT 230 kV PITUACU /NARANDIBA C-2 BA RB FT LT 230 kV PITUACU /NARANDIBA C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 96,867.65
  LT 230 kV PITUACU /NARANDIBA BA LT 230 kV PITUACU /NARANDIBA C-2 BA RB FT LT 230 kV PITUACU /NARANDIBA C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 212,486.23
  LT 230 kV PITUACU /RL (COTEGIPE / MATATU) BA/PE LT 230 kV PITUACU /RL (COTEGIPE / MATATU) C-1 BA/PE RB FT LT 230 kV PITUACU /RL (COTEGIPE/MATATU) C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 49,392.80
  LT 230 kV PITUACU /RL (COTEGIPE / MATATU) BA/PE LT 230 kV PITUACU /RL (COTEGIPE / MATATU) C-1 BA/PE RB FT LT 230 kV PITUACU /RL (COTEGIPE/MATATU) C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 68,181.05
  LT 230 kV QUIXERE /MOSSORO II CE/RN LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RBNI REA 6894/2018 1/7/2018 11/11/2044 3,515.58
  LT 230 kV QUIXERE /MOSSORO II CE/RN LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 949,861.55
  LT 230 kV QUIXERE /MOSSORO II CE/RN LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,311,174.10
  LT 230 kV RECIFE II /GOIANINHA PE LT 230 kV RECIFE II /GOIANINHA C-2 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,070,609.41
  LT 230 kV RECIFE II /GOIANINHA PE LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,070,609.41
  LT 230 kV RECIFE II /JABOATAO II PE LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 140,198.85
  LT 230 kV RECIFE II /JABOATAO II PE LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 193,528.31
  LT 230 kV RECIFE II /JABOATAO II PE LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBNI REA 10092/2021 11/3/2021 11/3/2056 279,444.10
  LT 230 kV RECIFE II /JOAIRAM PE LT 230 kV RECIFE II /JOAIRAM C-3 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 133,151.42
  LT 230 kV RECIFE II /JOAIRAM PE LT 230 kV RECIFE II /JOAIRAM C-2 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 133,151.42
  LT 230 kV RECIFE II /JOAIRAM PE LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,695.41
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RMEL REN 643/2014 3/12/2015 2/12/2043 27,533.63
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,830.42
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 472,327.68
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 598,412.78
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 641,644.67
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 651,993.78
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 826,039.69
  LT 230 kV RECIFE II /MIRUEIRA PE LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,811,978.09
  LT 230 kV RECIFE II /PAU FERRO PE LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 497,818.38
  LT 230 kV RECIFE II /PAU FERRO PE LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 497,818.38
  LT 230 kV RECIFE II /PAU FERRO PE LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 687,180.75
  LT 230 kV RECIFE II /PAU FERRO PE LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 687,180.75
  LT 230 kV RECIFE II /PIRAPAMA II PE LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 455,233.92
  LT 230 kV RECIFE II /PIRAPAMA II PE LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 628,397.82
  LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBNI REA 3817/2013 20/08/2019 20/08/2056 26,681.97
  LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 850,189.83
  LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,075,243.27
  LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,484,249.09
  LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 2823/2011 1/2/2016 31/01/2052 2,801,398.55
  LT 230 kV RIBEIRAO /RECIFE II PE LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,255,808.26
  LT 230 kV RIO LARGO II /ARAPIRACA III AL LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBNI REA 10134/2021 15/08/2016 14/08/2044 451,776.18
  LT 230 kV RIO LARGO II /ARAPIRACA III AL LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,662,242.14
  LT 230 kV RIO LARGO II /ARAPIRACA III AL LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,294,533.19
  LT 230 kV RIO LARGO II /ARAPIRACA III AL LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,033,225.34
  LT 230 kV RIO LARGO II /BRASKEM AL LT 230 kV RIO LARGO II /BRASKEM C-1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 484,809.33
  LT 230 kV RIO LARGO II /BRASKEM AL LT 230 kV RIO LARGO II /BRASKEM C-1 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 669,223.26
  LT 230 kV RUSSAS II /BANABUIU CE LT 230 kV RUSSAS II /BANABUIU C-1 CE RB FT LT 230 kV RUSSAS II /BANABUIU C-1 CE 018/2012 IPCA RBL CC 018/2012 15/12/2020 1/6/2042 6,059,862.79
  LT 230 kV RUSSAS II /QUIXERE CE LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RBNI REA 6894/2018 1/7/2018 11/11/2044 3,515.58
  LT 230 kV RUSSAS II /QUIXERE CE LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 474,930.77
  LT 230 kV RUSSAS II /QUIXERE CE LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 655,587.05
  LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RMEL REN 643/2014 24/07/2014 23/07/2039 668,639.28
  LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,284,621.24
  LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,534,040.05
  LT 230 kV S.JOAO PIAUI /ELISEU MARTIN PI LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 9,945,746.43
  LT 230 kV S.JOAO PIAUI /PICOS PI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,187,735.36
  LT 230 kV S.JOAO PIAUI /PICOS PI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,400,300.29
  LT 230 kV S.JOAO PIAUI /PICOS PI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 9,652,378.55
  LT 230 kV SANTA RITA II /MUSSURE II PB LT 230 kV SANTA RITA II /MUSSURE II C-1 PB RB FT LT 230 kV SANTA RITA II /MUSSURE II C-1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 89,261.55
  LT 230 kV SANTA RITA II /MUSSURE II PB LT 230 kV SANTA RITA II /MUSSURE II C-1 PB RB FT LT 230 kV SANTA RITA II /MUSSURE II C-1 PB 061/2001 IPCA RBNI REA 10199/2021 17/05/2021 17/05/2054 120,944.50
  LT 230 kV SANTA RITA II /MUSSURE II PB LT 230 kV SANTA RITA II /MUSSURE II C-1 PB RB FT LT 230 kV SANTA RITA II /MUSSURE II C-1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 123,215.26
  LT 230 kV SANTANA II /ANGELIM AL/PE LT 230 kV SANTANA II /ANGELIM C-1 AL/PE RB FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE 061/2001 IPCA RBNI DSP 1019/2022 1/7/2021 30/06/2057 325,081.47
  LT 230 kV SANTANA II /ANGELIM AL/PE LT 230 kV SANTANA II /ANGELIM C-1 AL/PE RB FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,569,565.46
  LT 230 kV SAO LUIS II /SAO LUIS III MA LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA 004/2010 IPCA RBL CC 004/2010 12/7/2010 12/7/2040 2,254,103.82
  LT 230 kV SAPEACU /FUNIL BA LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,717,758.11
  LT 230 kV SAPEACU /STO.A.JESUS BA LT 230 kV SAPEACU /STO.A.JESUS C-2 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 479,824.95

 

91 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 230 kV SAPEACU /STO.A.JESUS BA LT 230 kV SAPEACU /STO.A.JESUS C-1 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 479,824.95
  LT 230 kV SAPEACU /STO.A.JESUS BA LT 230 kV SAPEACU /STO.A.JESUS C-2 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 662,342.89
  LT 230 kV SAPEACU /STO.A.JESUS BA LT 230 kV SAPEACU /STO.A.JESUS C-2 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,452,897.27
  LT 230 kV SOBRAL II /SOBRAL III CE LT 230 kV SOBRAL II /SOBRAL III C-2 CE RB FT LT 230 kV SOBRAL II /SOBRAL III C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,309.41
  LT 230 kV SOBRAL II /SOBRAL III CE LT 230 kV SOBRAL II /SOBRAL III C-1 CE RB FT LT 230 kV SOBRAL II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,309.41
  LT 230 kV SOBRAL III /ACARAU II CE LT 230 kV SOBRAL III /ACARAU II C-1 CE RB FT LT 230 kV SOBRAL III /ACARAU II C-1 CE 021/2010 IPCA RBL CC 021/2010 8/4/2014 23/11/2040 3,819,751.29
  LT 230 kV SR.BONFIM II /CAMPO FORMOSO BA LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA RB FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,000,481.50
  LT 230 kV SR.BONFIM II /CAMPO FORMOSO BA LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA RB FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,381,049.10
  LT 230 kV SR.BONFIM II /CAMPO FORMOSO BA LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA RB FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,029,431.58
  LT 230 kV STO.A.JESUS /FUNIL BA LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,438,110.51
  LT 230 kV STO.A.JESUS /FUNIL BA LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,910,438.19
  LT 230 kV STO.A.JESUS /FUNIL BA LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,017,523.59
  LT 230 kV STO.A.JESUS /FUNIL BA LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 8,812,730.03
  LT 230 kV SUAPE II /SUAPE III PE LT 230 kV SUAPE II /SUAPE III C-2 PE RB FT LT 230 kV SUAPE II /SUAPE III C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 629,842.25
  LT 230 kV SUAPE II /SUAPE III PE LT 230 kV SUAPE II /SUAPE III C-1 PE RB FT LT 230 kV SUAPE II /SUAPE III C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 629,842.25
  LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II BA LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA RB FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA 061/2001 IPCA RBNI REA 10198/2021 5/6/2019 4/6/2047 1,163.27
  LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II BA LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA RB FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA 061/2001 IPCA RBNI REA 9680/2021 19/11/2019 18/11/2047 51,715.90
  LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II BA LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA RB FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,841,554.71
  LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II BA LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA RB FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,542,053.47
  LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II BA LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA RB FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,576,179.06
  LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,368,954.70
  LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,368,954.70
  LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,270,068.21
  LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,270,068.21
  LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,173,132.33
  LT 230 kV TACAIMBO /C.GRANDE II PE/PB LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,173,132.33
  LT 230 kV TACARUTU /BOM NOME PE LT 230 kV TACARUTU /BOM NOME C-1 PE RB FT LT 230 kV TACARUTU /BOM NOME C-1 PE 061/2001 IPCA RBNI REA 7026/2018 1/7/2018 14/12/2044 82,029.86
  LT 230 kV TACARUTU /BOM NOME PE LT 230 kV TACARUTU /BOM NOME C-1 PE RB FT LT 230 kV TACARUTU /BOM NOME C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,401,240.73
  LT 230 kV TERESINA /PIRIPIRI PI LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,938,871.63
  LT 230 kV TERESINA II /TERESINA III PI LT 230 kV TERESINA II /TERESINA III C-2 PI RB FT LT 230 kV TERESINA II /TERESINA III C-2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 9/12/2041 1,529,584.36
  LT 230 kV TERESINA II /TERESINA III PI LT 230 kV TERESINA II /TERESINA III C-1 PI RB FT LT 230 kV TERESINA II /TERESINA III C-1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 9/12/2041 1,529,584.36
  LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 417,297.76
  LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 417,297.76
  LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 576,031.33
  LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 576,031.33
  LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,263,566.60
  LT 230 kV TERESINA II /TERESINA PI LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,263,566.60
  LT 230 kV TOUROS /CEARA MIRIM II RN LT 230 kV TOUROS /CEARA MIRIM II C-1 RN RB FT LT 230 kV TOUROS /CEARA MIRIM II C-1 RN 018/2012 IPCA RBL CC 018/2012 12/5/2017 1/6/2042 3,268,323.16
  LT 230 kV U. A. SALES /P.AFONSO III BA/AL LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 129,941.06
  LT 230 kV U. A. SALES /P.AFONSO III BA/AL LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,220.73
  LT 230 kV U. A. SALES /P.AFONSO III BA/AL LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 179,368.62
  LT 230 kV U. A. SALES /P.AFONSO III BA/AL LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 182,515.43
  LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBNI REA 2891/2011 11/9/2017 10/9/2053 389,381.28
  LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBNI REA 2891/2011 11/9/2017 10/9/2053 389,381.28
  LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 637,267.51
  LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 637,267.51
  LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 879,674.15
  LT 230 kV U.SOBRADINHO /JUAZEIRO II BA LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 879,674.15
  LT 230 kV UB.ESPERANCA /B. ESPERANCA PI LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 69,149.92
  LT 230 kV UB.ESPERANCA /B. ESPERANCA PI LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 95,453.47
  LT 500 kV ANGELIM II /PAU FERRO PE LT 500 kV ANGELIM II /PAU FERRO C-1 PE RB FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,557,988.99
  LT 500 kV ANGELIM II /PAU FERRO PE LT 500 kV ANGELIM II /PAU FERRO C-1 PE RB FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 10,432,930.41
  LT 500 kV ANGELIM II /RECIFE II PE LT 500 kV ANGELIM II /RECIFE II C-2 PE RB FT LT 500 kV ANGELIM II /RECIFE II C-2 PE 061/2001 IPCA RBNI REA 5654/2016 29/11/2017 28/11/2050 940,982.33
  LT 500 kV ANGELIM II /RECIFE II PE LT 500 kV ANGELIM II /RECIFE II C-2 PE RB FT LT 500 kV ANGELIM II /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,915,607.91
  LT 500 kV ANGELIM II /RECIFE II PE LT 500 kV ANGELIM II /RECIFE II C-2 PE RB FT LT 500 kV ANGELIM II /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 10,926,582.00
  LT 500 kV CAMACARI IV /CAMACARI II BA LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBNI REA 10135/2021 15/08/2016 15/08/2050 14,870.71
  LT 500 kV CAMACARI IV /CAMACARI II BA LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,112.81
  LT 500 kV CAMACARI IV /CAMACARI II BA LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 63,653.41
  LT 500 kV CAMACARI IV /CAMACARI II BA LT 500 kV CAMACARI IV /CAMACARI II C-1 BA RB FT LT 500 kV CAMACARI IV /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 139,628.38
  LT 500 kV CEARA MIRIM II /C.GRANDE III RN/PB LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB RB FT LT 500 kV CEARA MIRIM II /C.GRANDE III C-1 RN/PB 008/2011 IPCA RBL CC 008/2011 13/05/2015 13/10/2041 13,228,029.26
  LT 500 kV GARANHUNS II /ANGELIM II PE LT 500 kV GARANHUNS II /ANGELIM II C-1 PE RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RBNI REA 5654/2016 19/09/2017 18/09/2050 66,106.02
  LT 500 kV GARANHUNS II /ANGELIM II PE LT 500 kV GARANHUNS II /ANGELIM II C-1 PE RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RMEL REN 643/2014 30/11/2015 29/11/2048 109,682.80
  LT 500 kV GARANHUNS II /ANGELIM II PE LT 500 kV GARANHUNS II /ANGELIM II C-1 PE RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 739,166.00
  LT 500 kV GARANHUNS II /ANGELIM II PE LT 500 kV GARANHUNS II /ANGELIM II C-1 PE RB FT LT 500 kV GARANHUNS II /ANGELIM II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,020,333.25
  LT 500 kV JARDIM /CAMACARI IV SE/BA LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBNI REA 10135/2021 15/08/2016 15/08/2050 14,870.71
  LT 500 kV JARDIM /CAMACARI IV SE/BA LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 11,528,203.15
  LT 500 kV JARDIM /CAMACARI IV SE/BA LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 15,913,352.26
  LT 500 kV JARDIM /CAMACARI IV SE/BA LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA RB FT LT 500 kV JARDIM /CAMACARI IV C-1 SE/BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 34,907,094.92
  LT 500 kV JOAO CAMARA III /CEARA MIRIM II RN LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN RB FT LT 500 kV JOAO CAMARA III /CEARA MIRIM II C-1 RN 008/2011 IPCA RBL CC 008/2011 13/10/2014 13/10/2041 4,212,823.94
  LT 500 kV JUAZEIRO III /U.SOBRADINHO BA LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBNI REA 9689/2021 31/07/2019 30/07/2047 29,578.94
  LT 500 kV JUAZEIRO III /U.SOBRADINHO BA LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,947,601.24
  LT 500 kV JUAZEIRO III /U.SOBRADINHO BA LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,688,438.45
  LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-3 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,169.74
  LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,169.74
  LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,169.74
  LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-3 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 49,928.14
  LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-2 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 49,928.14
  LT 500 kV L.GONZAGA /US. L.GONZAGA PE LT 500 kV L.GONZAGA /US. L.GONZAGA C-1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 49,928.14
  LT 500 kV MESSIAS /SUAPE II AL/PE LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBNI REA 10229/2021 21/05/2021 21/05/2055 724,746.69
  LT 500 kV MESSIAS /SUAPE II AL/PE LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,390,579.96
  LT 500 kV MESSIAS /SUAPE II AL/PE LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 10,201,841.58
  LT 500 kV MESSIAS /SUAPE II AL/PE LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 22,378,481.08
  LT 500 kV MILAGRES /QUIXADA CE LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 12,427,550.80
  LT 500 kV MILAGRES /QUIXADA CE LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 17,154,797.75
  LT 500 kV MILAGRES /QUIXADA CE LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 37,630,295.85
  LT 500 kV OLINDINA /CAMACARI II BA LT 500 kV OLINDINA /CAMACARI II C-2 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,811,967.21

 

92 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 500 kV OLINDINA /CAMACARI II BA LT 500 kV OLINDINA /CAMACARI II C-1 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,825,878.65
  LT 500 kV OLINDINA /CAMACARI II BA LT 500 kV OLINDINA /CAMACARI II C-2 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 9,403,133.54
  LT 500 kV OLINDINA /CAMACARI II BA LT 500 kV OLINDINA /CAMACARI II C-1 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 9,422,336.68
  LT 500 kV OLINDINA /US. L.GONZAGA BA/PE LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 11,527,944.51
  LT 500 kV OLINDINA /US. L.GONZAGA BA/PE LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 15,912,995.23
  LT 500 kV P. AFONSO IV /ANGELIM II BA/PE LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,271,277.99
  LT 500 kV P. AFONSO IV /ANGELIM II BA/PE LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 14,178,312.32
  LT 500 kV P. AFONSO IV /OLINDINA BA LT 500 kV P. AFONSO IV /OLINDINA C-1 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,867,846.30
  LT 500 kV P. AFONSO IV /OLINDINA BA LT 500 kV P. AFONSO IV /OLINDINA C-1 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 13,621,421.50
  LT 500 kV P. AFONSO IV /USINA XINGO BA/AL LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,494,784.45
  LT 500 kV P. AFONSO IV /USINA XINGO BA/AL LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,443,761.64
  LT 500 kV P. AFONSO IV /USINA XINGO BA/AL LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,554,141.48
  LT 500 kV PAU FERRO /RECIFE II PE LT 500 kV PAU FERRO /RECIFE II C-1 PE RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 283,424.59
  LT 500 kV PAU FERRO /RECIFE II PE LT 500 kV PAU FERRO /RECIFE II C-1 PE RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 391,234.89
  LT 500 kV PECEM II /FORTALEZA II CE LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,038,410.18
  LT 500 kV PECEM II /FORTALEZA II CE LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,813,789.70
  LT 500 kV PECEM II /FORTALEZA II CE LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,172,252.25
  LT 500 kV QUIXADA /FORTALEZA II CE LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 643/2014 27/08/2015 26/08/2052 8,799.97
  LT 500 kV QUIXADA /FORTALEZA II CE LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,329,704.04
  LT 500 kV QUIXADA /FORTALEZA II CE LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 8,737,424.97
  LT 500 kV QUIXADA /FORTALEZA II CE LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 19,166,176.80
  LT 500 kV S.JOAO PIAUI /B. ESPERANCA PI LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,827,735.49
  LT 500 kV S.JOAO PIAUI /B. ESPERANCA PI LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 14,946,437.59
  LT 500 kV SOBRAL III /PECEM II CE LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,736,693.20
  LT 500 kV SOBRAL III /PECEM II CE LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 10,679,610.92
  LT 500 kV SOBRAL III /PECEM II CE LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 23,426,502.85
  LT 500 kV SUAPE II /RECIFE II PE LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 10229/2021 21/05/2021 21/05/2055 724,746.69
  LT 500 kV SUAPE II /RECIFE II PE LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 770,796.68
  LT 500 kV SUAPE II /RECIFE II PE LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,063,995.75
  LT 500 kV SUAPE II /RECIFE II PE LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,333,952.02
  LT 500 kV TERESINA II /P.DUTRA PI/MA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RMEL REN 643/2014 30/09/2015 29/09/2040 833,150.06
  LT 500 kV TERESINA II /P.DUTRA PI/MA LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,631,351.87
  LT 500 kV TERESINA II /P.DUTRA PI/MA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,640,626.16
  LT 500 kV TERESINA II /P.DUTRA PI/MA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 13,307,770.34
  LT 500 kV TERESINA II /P.DUTRA PI/MA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 29,191,561.59
  LT 500 kV TERESINA II /TIANGUA II PI/CE LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBNI REA 9688/2021 19/09/2019 18/09/2047 491,761.87
  LT 500 kV TERESINA II /TIANGUA II PI/CE LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,971,487.01
  LT 500 kV TIANGUA II /SOBRAL III CE LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBNI REA 9688/2021 3/10/2019 2/10/2047 488,562.95
  LT 500 kV TIANGUA II /SOBRAL III CE LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,525,854.32
  LT 500 kV U.SOBRADINHO /S.JOAO PIAUI BA/PI LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,784,377.68
  LT 500 kV U.SOBRADINHO /S.JOAO PIAUI BA/PI LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 13,506,202.71
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,169.74
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,169.74
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,169.74
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-3 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 49,928.14
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 49,928.14
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 49,928.14
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-3 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 109,521.01
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 109,521.01
  LT 500 kV U.SOBRADINHO /SOBRADINHO BA LT 500 kV U.SOBRADINHO /SOBRADINHO C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 109,521.01
  LT 500 kV US. L.GONZAGA /GARANHUNS II PE LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RMEL REN 643/2014 30/11/2015 29/11/2048 1,897,194.49
  LT 500 kV US. L.GONZAGA /GARANHUNS II PE LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,779,504.21
  LT 500 kV US. L.GONZAGA /GARANHUNS II PE LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 14,879,859.89
  LT 500 kV US. L.GONZAGA /JUAZEIRO III PE/BA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBNI REA 9689/2021 31/07/2019 30/07/2047 29,578.94
  LT 500 kV US. L.GONZAGA /JUAZEIRO III PE/BA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 11,527,944.51
  LT 500 kV US. L.GONZAGA /JUAZEIRO III PE/BA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 15,912,995.23
  LT 500 kV US. L.GONZAGA /MILAGRES PE/CE LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,702,532.55
  LT 500 kV US. L.GONZAGA /MILAGRES PE/CE LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 14,773,609.41
  LT 500 kV US. L.GONZAGA /MILAGRES PE/CE LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 32,406,986.13
  LT 500 kV USINA XINGO /JARDIM AL/SE LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,410,159.02
  LT 500 kV USINA XINGO /JARDIM AL/SE LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 10,228,868.21
  LT 500 kV USINA XINGO /JARDIM AL/SE LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 22,437,765.96
  LT 500 kV USINA XINGO /MESSIAS AL LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,155,349.34
  LT 500 kV USINA XINGO /MESSIAS AL LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 14,018,286.22
  LT 500 kV USINA XINGO /MESSIAS AL LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 30,750,129.82
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-6 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 41,169.50
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-5 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 41,169.50
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-4 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,315.68
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-3 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,315.68
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-2 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,315.68
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,315.68
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-6 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 56,829.73
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-5 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 56,829.73
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-4 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,933.45
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-3 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,933.45
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-2 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,933.45
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-1 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,933.45
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-6 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 124,660.15
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-5 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 124,660.15
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-4 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 140,242.67
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-3 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 140,242.67
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-2 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 140,242.67
  LT 500 kV USINA XINGO /XINGO AL LT 500 kV USINA XINGO /XINGO C-1 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 140,242.67
  LT 69 kV ABAIXADORA /MOXOTO BA LT 69 kV ABAIXADORA /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 71,364.64
  LT 69 kV ABAIXADORA /MULUNGU BA LT 69 kV ABAIXADORA /MULUNGU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,522.68
  LT 69 kV ABAIXADORA /ZEBU BA/AL LT 69 kV ABAIXADORA /ZEBU C-1 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,711.15

 

93 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 69 kV CAMACARI II /CAMACARI II BA LT 69 kV CAMACARI II /CAMACARI II C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 20,301.95
  LT 69 kV CATU /COTEGIPE BA LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RMEL REN 643/2014 18/05/2015 17/05/2048 307,882.14
  LT 69 kV CATU /COTEGIPE BA LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RMEL REN 643/2014 18/05/2015 17/05/2048 307,882.14
  LT 69 kV CATU /COTEGIPE BA LT 69 kV CATU /COTEGIPE C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 441,043.30
  LT 69 kV CATU /COTEGIPE BA LT 69 kV CATU /COTEGIPE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 441,043.30
  LT 69 kV MATATU /PITUACU BA LT 69 kV MATATU /PITUACU C-1 BA DIT   061/2001 IPCA RMEL REN 643/2014 23/12/2015 22/12/2040 28,685.08
  LT 69 kV MATATU /PITUACU BA LT 69 kV MATATU /PITUACU C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 80,420.22
  LT 69 kV MATATU /PITUACU BA LT 69 kV MATATU /PITUACU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 81,506.98
  LT 69 kV MATATU /PITUACU BA LT 69 kV MATATU /PITUACU C-1 BA DIT   061/2001 IPCA RMEL REN 643/2014 18/05/2015 17/05/2048 321,649.48
  LT 69 kV MOD.REDUZIDO /RL (ABAIXADORA / MOXOTO) BA LT 69 kV MOD.REDUZIDO /RL (ABAIXADORA / MOXOTO) C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 7,293.56
  LT 69 kV PEDRA /JEQUIE BA LT 69 kV PEDRA /JEQUIE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 253,030.30
  LT 69 kV PEDRA /JEQUIE BA LT 69 kV PEDRA /JEQUIE C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 349,279.10
  LT 69 kV PITUACU /COTEGIPE BA LT 69 kV PITUACU /COTEGIPE C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 218,167.01
  LT 69 kV PITUACU /COTEGIPE BA LT 69 kV PITUACU /COTEGIPE C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 220,159.40
  LT 69 kV ZEBU /MOXOTO BA LT 69 kV ZEBU /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 96,948.20
  LT 69 kV ZEBU /MOXOTO BA LT 69 kV ZEBU /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 133,825.78
  LT 69 kV ZEBU /MOXOTO BA LT 69 kV ZEBU /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 293,556.58
  MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBNI REA 2040/2009 28/01/2013 27/01/2043 58,368.48
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR4 AL RBF FT TR 230/69 kV MACEIO TR4 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 73,557.27
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 73,557.27
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 73,557.27
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR1 AL RBF FT TR 230/69 kV MACEIO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 73,557.27
  MACEIO TT 69/0 kV MACEIO TA2 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 101,537.31
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 101,537.31
  MACEIO IB 230 kV MG 230 kV MACEIO MG1 AL IB1 RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR4 AL RBF FT TR 230/69 kV MACEIO TR4 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR1 AL RBF FT TR 230/69 kV MACEIO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MACEIO IB 230 kV MG 230 kV MACEIO MG1 AL IB1 RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 166,420.18
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 222,729.47
  MACEIO MC 69 kV TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 222,729.47
  MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  MACEIO IB 230 kV MG 230 kV MACEIO MG1 AL IB1 RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 365,054.76
  MACEIO TR 230/69 kV MACEIO TR4 AL RBF FT TR 230/69 kV MACEIO TR4 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MACEIO TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MACEIO TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MACEIO TR 230/69 kV MACEIO TR1 AL RBF FT TR 230/69 kV MACEIO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  MACEIO MC 230 kV TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  MACEIO TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  MACEIO TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  MACEIO TR 230/69 kV MACEIO TR1 AL RBF FT TR 230/69 kV MACEIO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  MACEIO MG 230 kV MACEIO MG1 AL RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 521,648.64
  MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  MACEIO EL 230 kV MACEIO LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  MACEIO MG 230 kV MACEIO MG1 AL RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 720,075.66
  MACEIO TR 230/69 kV MACEIO TR3 AL RBF FT TR 230/69 kV MACEIO TR3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  MACEIO TR 230/69 kV MACEIO TR2 AL RBF FT TR 230/69 kV MACEIO TR2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  MACEIO TR 230/69 kV MACEIO TR1 AL RBF FT TR 230/69 kV MACEIO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  MACEIO MG 230 kV MACEIO MG1 AL RB FT MG 230 kV MACEIO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,579,538.31
  MACEIO II MC 69 kV TT 69/0 kV MACEIO II TT1 AL DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/5/2042 63,256.61
  MACEIO II IB 69 kV MG 230 kV MACEIO II MG1 AL IB1 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/5/2042 102,913.10
  MACEIO II MC 69 kV TR 230/69 kV MACEIO II TR2 AL RBF FT TR 230/69 kV MACEIO II TR2 AL 005/2012 IPCA RBL CC 005/2012 1/3/2019 10/5/2042 148,082.69
  MACEIO II MC 69 kV TR 230/69 kV MACEIO II TR1 AL RBF FT TR 230/69 kV MACEIO II TR1 AL 005/2012 IPCA RBL CC 005/2012 1/3/2019 10/5/2042 148,082.69
  MACEIO II TT 69/0 kV MACEIO II TT1 AL DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/5/2042 169,760.96
  MACEIO II EL 69 kV MACEIO II  DIST4 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/5/2042 175,190.97
  MACEIO II EL 69 kV MACEIO II  DIST3 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/5/2042 175,190.97
  MACEIO II EL 69 kV MACEIO II  DIST2 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/5/2042 175,190.97
  MACEIO II EL 69 kV MACEIO II  DIST1 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/5/2042 175,190.97
  MACEIO II IB 230 kV MG 230 kV MACEIO II MG1 AL IB1 RB FT MG 230 kV MACEIO II MG1 AL 005/2012 IPCA RBL CC 005/2012 1/3/2019 10/5/2042 317,528.05
  MACEIO II MC 230 kV TR 230/69 kV MACEIO II TR2 AL RBF FT TR 230/69 kV MACEIO II TR2 AL 005/2012 IPCA RBL CC 005/2012 1/3/2019 10/5/2042 363,807.00
  MACEIO II MC 230 kV TR 230/69 kV MACEIO II TR1 AL RBF FT TR 230/69 kV MACEIO II TR1 AL 005/2012 IPCA RBL CC 005/2012 1/3/2019 10/5/2042 363,807.00
  MACEIO II EL 230 kV MACEIO II LT 230 kV MESSIAS /MACEIO II C-2 AL RB FT LT 230 kV MESSIAS /MACEIO II C-2 AL 005/2012 IPCA RBL CC 005/2012 1/3/2019 10/5/2042 557,361.56
  MACEIO II EL 230 kV MACEIO II LT 230 kV MESSIAS /MACEIO II C-1 AL RB FT LT 230 kV MESSIAS /MACEIO II C-1 AL 005/2012 IPCA RBL CC 005/2012 1/3/2019 10/5/2042 557,361.56
  MACEIO II MG 230 kV MACEIO II MG1 AL RB FT MG 230 kV MACEIO II MG1 AL 005/2012 IPCA RBL CC 005/2012 1/3/2019 10/5/2042 1,041,776.85
  MACEIO II TR 230/69 kV MACEIO II TR2 AL RBF FT TR 230/69 kV MACEIO II TR2 AL 005/2012 IPCA RBL CC 005/2012 1/3/2019 10/5/2042 1,280,917.06
  MACEIO II TR 230/69 kV MACEIO II TR1 AL RBF FT TR 230/69 kV MACEIO II TR1 AL 005/2012 IPCA RBL CC 005/2012 1/3/2019 10/5/2042 1,280,917.06
  MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RMEL REN 443/2011 2/2/2016 1/2/2046 3,412.89
  MATATU EL 69 kV MATATU  DIST1 DIT   061/2001 IPCA RMEL REN 443/2011 12/10/2015 11/10/2045 8,256.18
  MATATU EL 69 kV MATATU  LAPINHA 02V7 DIT   061/2001 IPCA RCDM REA 2376/2010 5/4/2014 4/4/2044 8,531.92
  MATATU EL 69 kV MATATU  AMARALINA 02V3 DIT   061/2001 IPCA RCDM REA 2376/2010 25/05/2014 24/05/2044 8,566.20
  MATATU TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RMEL REN 443/2011 2/2/2016 1/2/2046 13,471.47
  MATATU MC 230 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RMEL REN 443/2011 2/2/2016 1/2/2046 13,471.47
  MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RMEL REN 443/2011 27/11/2016 26/11/2046 16,095.48
  MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RMEL REN 443/2011 27/11/2016 26/11/2046 16,095.48
  MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RMEL REN 443/2011 27/11/2016 26/11/2046 16,095.48
  MATATU EL 69 kV MATATU  LAPINHA 02V7 DIT   061/2001 IPCA RCDM REA 2376/2010 10/5/2014 9/5/2044 17,111.84
  MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2043 19,783.74
  MATATU MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA DIT   061/2001 IPCA RCDM REA 7761/2019 2/5/2019 1/5/2055 20,680.69

 

94 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MATATU EL 230 kV MATATU LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RMEL REN 443/2011 13/02/2015 12/2/2038 21,086.24
  MATATU MC 230 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RMEL REN 443/2011 10/4/2016 9/4/2039 21,939.16
  MATATU MC 69 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBNI REA 2837/2011 25/11/2019 24/11/2049 25,160.68
  MATATU EL 69 kV MATATU  CANDEAL 02V4 DIT   061/2001 IPCA RCDM REA 2376/2010 10/5/2014 9/5/2044 25,478.49
  MATATU EL 69 kV MATATU  DIST2 DIT   061/2001 IPCA RCDM REA 5484/2015 11/4/2014 10/4/2044 28,668.50
  MATATU EL 69 kV MATATU  CANDEAL 02V4 DIT   061/2001 IPCA RCDM REA 2376/2010 22/03/2014 21/03/2045 30,481.96
  MATATU EL 69 kV MATATU  AMARALINA 02V3 DIT   061/2001 IPCA RCDM REA 2376/2010 25/05/2014 24/05/2045 30,820.24
  MATATU IB 11,9 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,948.27
  MATATU EL 69 kV MATATU  AMARALINA 02V3 DIT   061/2001 IPCA RCDM REA 2376/2010 25/05/2014 24/05/2045 33,092.09
  MATATU EL 69 kV MATATU  DIST2 DIT   061/2001 IPCA RCDM REA 2837/2011 1/6/2013 31/05/2045 35,286.46
  MATATU MC 69 kV TR 230/69 kV MATATU TR3 BA RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBNI REA 3578/2012 25/11/2019 24/11/2052 37,714.78
  MATATU MC 69 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBNI REA 3578/2012 25/11/2019 24/11/2052 37,714.78
  MATATU MC 69 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBNI REA 3578/2012 25/11/2019 24/11/2052 37,714.78
  MATATU MC 230 kV TT 69/13,8 kV MATATU TA1 BA DIT   061/2001 IPCA RCDM REA 7806/2019 3/12/2021 3/12/2036 37,762.90
  MATATU EL 230 kV MATATU LT 230 kV COTEGIPE /MATATU C-1 BA RB FT LT 230 kV COTEGIPE /MATATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 10/11/2013 9/11/2041 38,252.05
  MATATU EL 230 kV MATATU LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RMEL REN 643/2014 2/2/2014 1/2/2042 38,531.03
  MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBNI REA 7806/2019 20/10/2021 20/10/2052 39,137.08
  MATATU IB 69 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  MATATU IB 11,9 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 44,100.90
  MATATU EL 69 kV MATATU  LAPINHA 02V7 DIT   061/2001 IPCA RCDM REA 2837/2011 31/12/2019 30/12/2052 44,357.73
  MATATU EL 69 kV MATATU  CANDEAL 02V4 DIT   061/2001 IPCA RCDM REA 2837/2011 31/12/2019 30/12/2052 44,357.73
  MATATU EL 69 kV MATATU  AMARALINA 02V3 DIT   061/2001 IPCA RCDM REA 2837/2011 30/01/2020 29/01/2053 44,421.10
  MATATU MC 4,16 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  MATATU MC 4,16 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  MATATU IB 69 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RCDM REA 7806/2019 3/12/2021 3/12/2052 49,131.61
  MATATU MC 11,9 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,453.67
  MATATU MC 11,9 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,453.67
  MATATU MC 11,9 kV TR 11,9/0,22 kV MATATU TR7 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,453.67
  MATATU MC 11,9 kV TR 11,9/0,22 kV MATATU TR6 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,453.67
  MATATU MC 69 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBNI REA 2837/2011 2/2/2020 1/2/2050 50,499.87
  MATATU IB 69 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RCDM REA 7806/2019 3/12/2021 3/12/2053 53,407.26
  MATATU EL 11,9 kV MATATU  DIST9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  MATATU EL 11,9 kV MATATU  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  MATATU EL 11,9 kV MATATU  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  MATATU EL 11,9 kV MATATU  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  MATATU EL 11,9 kV MATATU  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  MATATU EL 11,9 kV MATATU  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  MATATU EL 11,9 kV MATATU  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  MATATU EL 11,9 kV MATATU  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  MATATU EL 11,9 kV MATATU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  MATATU EL 11,9 kV MATATU  DIS12 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  MATATU EL 11,9 kV MATATU  DIS11 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  MATATU EL 11,9 kV MATATU  DIS10 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  MATATU IB 69 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  MATATU MC 4,16 kV CS 20/-10 Mvar MATATU CS2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 62,856.97
  MATATU MC 4,16 kV CS 20/-10 Mvar MATATU CS1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 62,856.97
  MATATU MC 4,16 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 64,170.73
  MATATU MC 4,16 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 64,170.73
  MATATU MC 69 kV TR 230/69 kV MATATU TR3 BA RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MATATU MC 69 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MATATU MC 69 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MATATU MC 11,9 kV CS 20/-10 Mvar MATATU CS2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,683.99
  MATATU MC 11,9 kV CS 20/-10 Mvar MATATU CS1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 66,683.99
  MATATU MC 11,9 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 69,645.47
  MATATU MC 11,9 kV TR 11,9/0,22 kV MATATU TR6 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 69,645.47
  MATATU MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  MATATU EL 11,9 kV MATATU  DIST9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  MATATU EL 11,9 kV MATATU  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  MATATU EL 11,9 kV MATATU  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  MATATU EL 11,9 kV MATATU  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  MATATU EL 11,9 kV MATATU  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  MATATU EL 11,9 kV MATATU  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  MATATU EL 11,9 kV MATATU  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  MATATU EL 11,9 kV MATATU  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  MATATU EL 11,9 kV MATATU  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  MATATU EL 11,9 kV MATATU  DIS12 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  MATATU EL 11,9 kV MATATU  DIS11 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  MATATU EL 11,9 kV MATATU  DIS10 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  MATATU EL 69 kV MATATU  PITUACU 02J5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MATATU EL 69 kV MATATU  LAPINHA 02V7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MATATU EL 69 kV MATATU  GRACA 02V6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MATATU EL 69 kV MATATU  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MATATU EL 69 kV MATATU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MATATU EL 69 kV MATATU  CENTRAL 02V2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MATATU EL 69 kV MATATU  CANDEAL 02V4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MATATU EL 69 kV MATATU  AMARALINA 02V3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MATATU MC 4,16 kV CS 20/-10 Mvar MATATU CS2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 86,766.78
  MATATU MC 4,16 kV CS 20/-10 Mvar MATATU CS1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 86,766.78
  MATATU EL 69 kV MATATU  CENTRAL 02V2 DIT   061/2001 IPCA RCDM REA 2837/2011 30/07/2019 29/07/2052 90,634.52
  MATATU MC 11,9 kV CS 20/-10 Mvar MATATU CS1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,049.54
  MATATU TT 69/13,8 kV MATATU TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  MATATU MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  MATATU EL 69 kV MATATU  AMARALINA 02V3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MATATU IB 230 kV MG 230 kV MATATU MG1 BA IB1 RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  MATATU TT 69/13,8 kV MATATU TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  MATATU IB 69 kV MG 230 kV MATATU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50

 

95 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MATATU BC 69 kV 27,1 Mvar MATATU BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 134,422.38
  MATATU MC 4,16 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 140,763.15
  MATATU MC 230 kV TR 230/69 kV MATATU TR3 BA RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MATATU MC 230 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MATATU MC 230 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MATATU MC 230 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MATATU RTS 13,8 kV 15 Mvar MATATU RTR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 160,613.98
  MATATU MC 4,16 kV CS 20/-10 Mvar MATATU CS2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 190,329.23
  MATATU MC 230 kV TR 230/69 kV MATATU TR3 BA RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  MATATU MC 230 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  MATATU MC 230 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  MATATU MC 230 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBNI REA 7806/2019 20/10/2021 20/10/2052 212,857.39
  MATATU TT 69/13,8 kV MATATU TA1 BA DIT   061/2001 IPCA RCDM REA 7806/2019 3/12/2021 3/12/2051 219,273.38
  MATATU EL 230 kV MATATU LT 230 kV COTEGIPE /MATATU C-1 BA RB FT LT 230 kV COTEGIPE /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MATATU EL 230 kV MATATU LT 230 kV CAMACARI II /MATATU C-1 BA RB FT LT 230 kV CAMACARI II /MATATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MATATU TR 230/11,9 kV MATATU TRR1 BA RBF FT TR 230/11,9 kV MATATU TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,729.78
  MATATU TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,729.78
  MATATU TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,729.78
  MATATU MC 69 kV BC 69 kV 27,1 Mvar MATATU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  MATATU TT 69/13,8 kV MATATU TA2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  MATATU TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 306,072.34
  MATATU TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 306,072.34
  MATATU MC 69 kV TR 230/69 kV MATATU TR4 BA RBF FT TR 230/69 kV MATATU TR4 BA 061/2001 IPCA RBNI REA 7806/2019 20/10/2021 20/10/2049 335,577.83
  MATATU TR 230/69 kV MATATU TR3 BA RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MATATU TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MATATU TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MATATU MC 230 kV TR 230/69 kV MATATU TR3 BA RBF FT TR 230/69 kV MATATU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  MATATU MC 230 kV TR 230/69 kV MATATU TR2 BA RBF FT TR 230/69 kV MATATU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  MATATU MC 230 kV TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  MATATU MC 230 kV TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  MATATU MC 230 kV TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  MATATU TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  MATATU TR 230/11,9 kV MATATU TR5 BA RBF FT TR 230/11,9 kV MATATU TR5 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 671,391.92
  MATATU TR 230/11,9 kV MATATU TR4 BA RBF FT TR 230/11,9 kV MATATU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 671,391.92
  MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 674,862.84
  MATATU IB 230 kV MG 230 kV MATATU MG1 BA IB1 RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBNI REA 7806/2019 20/10/2021 20/10/2051 701,868.61
  MATATU CS 20/-10 Mvar MATATU CS2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 798,670.52
  MATATU CS 20/-10 Mvar MATATU CS1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 798,670.52
  MATATU MC 230 kV TR 230/69 kV MATATU TR4 BA RBF FT TR 230/69 kV MATATU TR4 BA 061/2001 IPCA RBNI REA 7806/2019 20/10/2021 20/10/2049 860,285.69
  MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 931,570.16
  MATATU TR 230/69 kV MATATU TR1 BA RBF FT TR 230/69 kV MATATU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  MATATU TR 230/69 kV MATATU TR4 BA RBF FT TR 230/69 kV MATATU TR4 BA 061/2001 IPCA RBNI REA 7806/2019 20/10/2021 20/10/2056 1,271,335.80
  MATATU MG 230 kV MATATU MG1 BA RB FT MG 230 kV MATATU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,043,466.86
  MESSIAS RTL 500 kV 50 Mvar MESSIAS RTR1 AL RB FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL 061/2001 IPCA RMEL REN 643/2014 6/2/2014 5/2/2049 10,389.53
  MESSIAS EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RMEL REN 643/2014 8/12/2013 7/12/2043 16,650.49
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 22,628.31
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 22,628.31
  MESSIAS EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBNI REA 5861/2016 8/5/2016 7/5/2044 27,088.13
  MESSIAS TR 69/13,8 kV MESSIAS TR3 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RMEL REN 443/2011 26/09/2016 25/09/2033 29,217.96
  MESSIAS RTL 500 kV 150 Mvar MESSIAS RT1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RMEL REN 643/2014 14/12/2013 13/12/2048 31,053.72
  MESSIAS TR 69/13,8 kV MESSIAS TR3 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RMEL REN 643/2014 22/05/2015 21/05/2043 48,428.36
  MESSIAS TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RMEL REN 643/2014 15/09/2013 14/09/2047 74,136.20
  MESSIAS TR 69/13,8 kV MESSIAS TR3 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  MESSIAS IB 230 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBNI REA 2040/2009 5/2/2018 4/2/2048 164,146.24
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBNI REA 2040/2009 9/11/2015 8/11/2046 185,704.91
  MESSIAS IB 230 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 220,807.62
  MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 220,807.62
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-3 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-2 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  MESSIAS MC 500 kV RTL 500 kV 150 Mvar MESSIAS RT1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  MESSIAS RTL 500 kV 50 Mvar MESSIAS RTR1 AL RB FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 268,494.05
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-3 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-2 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  MESSIAS RTL 500 kV 50 Mvar MESSIAS RTR1 AL RB FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 370,625.00
  MESSIAS IB 230 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 419,410.17

 

96 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB2 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 484,357.56
  MESSIAS MC 230 kV TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 484,357.56
  MESSIAS EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  MESSIAS EL 500 kV MESSIAS LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO II C-2 AL RB FT LT 230 kV MESSIAS /MACEIO II C-2 AL 005/2012 IPCA RBL CC 005/2012 1/3/2019 10/5/2042 557,361.56
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO II C-1 AL RB FT LT 230 kV MESSIAS /MACEIO II C-1 AL 005/2012 IPCA RBL CC 005/2012 1/3/2019 10/5/2042 557,361.56
  MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB2 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  MESSIAS TR 500/230 kV MESSIAS TRR1 AL RB FT TR 500/230 kV MESSIAS TRR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 647,846.29
  MESSIAS EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  MESSIAS EL 500 kV MESSIAS LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-3 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-2 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-2 AL RB FT LT 230 kV MESSIAS /MACEIO C-2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  MESSIAS EL 230 kV MESSIAS LT 230 kV MESSIAS /MACEIO C-1 AL RB FT LT 230 kV MESSIAS /MACEIO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-3 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-3 PE/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-2 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-2 PE/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  MESSIAS EL 230 kV MESSIAS LT 230 kV ANGELIM /MESSIAS C-1 PE/AL RB FT LT 230 kV ANGELIM /MESSIAS C-1 PE/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  MESSIAS RTL 500 kV 150 Mvar MESSIAS RT1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 805,482.14
  MESSIAS RTL 500 kV 50 Mvar MESSIAS RTR1 AL RB FT RTL 500 kV 50 Mvar MESSIAS RTR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 812,992.89
  MESSIAS TR 500/230 kV MESSIAS TRR1 AL RB FT TR 500/230 kV MESSIAS TRR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 894,276.94
  MESSIAS RTL 500 kV 150 Mvar MESSIAS RT1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,111,875.01
  MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,306,279.44
  MESSIAS MC 500 kV TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,306,279.44
  MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB2 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  MESSIAS IB 500 kV MG 500 kV MESSIAS MG1 AL IB1 RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,413,034.87
  MESSIAS EL 500 kV MESSIAS LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,480,048.26
  MESSIAS EL 500 kV MESSIAS LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,480,048.26
  MESSIAS TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  MESSIAS TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,950,531.35
  MESSIAS TR 500/230 kV MESSIAS TRR1 AL RB FT TR 500/230 kV MESSIAS TRR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,961,661.47
  MESSIAS RTL 500 kV 150 Mvar MESSIAS RT1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,438,978.66
  MESSIAS TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,682,830.82
  MESSIAS TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,682,830.82
  MESSIAS MG 500 kV MESSIAS MG1 AL RB FT MG 500 kV MESSIAS MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,278,632.30
  MESSIAS TR 500/230 kV MESSIAS TR3 AL RB FT TR 500/230 kV MESSIAS TR3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,884,984.41
  MESSIAS TR 500/230 kV MESSIAS TR2 AL RB FT TR 500/230 kV MESSIAS TR2 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,884,984.41
  MILAGRES EL 230 kV MILAGRES LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RMEL REN 443/2011 11/7/2015 10/7/2045 13,635.09
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RMEL REN 443/2011 23/01/2016 22/01/2046 13,842.26
  MILAGRES MC 230 kV RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RMEL REN 443/2011 27/10/2015 26/10/2045 15,618.79
  MILAGRES EL 500 kV MILAGRES LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/12/2015 17/12/2045 17,650.58
  MILAGRES EL 500 kV MILAGRES LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/12/2015 17/12/2045 17,650.58
  MILAGRES EL 500 kV MILAGRES LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/12/2015 17/12/2045 17,650.58
  MILAGRES IB 500 kV MG 500 kV MILAGRES MG1 CE IB1 RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 443/2011 8/12/2015 7/12/2045 18,224.86
  MILAGRES IB 500 kV MG 500 kV MILAGRES MG1 CE IB1 RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 443/2011 8/12/2015 7/12/2045 18,224.86
  MILAGRES IB 500 kV MG 500 kV MILAGRES MG1 CE IB1 RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 443/2011 8/12/2015 7/12/2045 18,224.86
  MILAGRES EL 500 kV MILAGRES LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 443/2011 8/3/2016 7/3/2046 18,282.32
  MILAGRES EL 500 kV MILAGRES LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 443/2011 8/3/2016 7/3/2046 18,282.32
  MILAGRES EL 500 kV MILAGRES LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 443/2011 8/3/2016 7/3/2046 18,282.32
  MILAGRES RTB 500 kV 99,1 MVAr MILAGRES RT2 CE RB FT RTB 500 kV 99,1 MVAr MILAGRES RT2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2015 25/11/2045 18,291.84
  MILAGRES RTB 500 kV 99,1 MVAr MILAGRES RT2 CE RB FT RTB 500 kV 99,1 MVAr MILAGRES RT2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2015 25/11/2045 18,291.84
  MILAGRES RTB 500 kV 99,1 MVAr MILAGRES RT2 CE RB FT RTB 500 kV 99,1 MVAr MILAGRES RT2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2015 25/11/2045 18,291.84
  MILAGRES MG 500 kV MILAGRES MG1 CE RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 643/2014 3/2/2014 2/2/2031 25,837.93
  MILAGRES MC 69 kV TT 69/13,8 kV MILAGRES TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  MILAGRES TR 69/13,8 kV MILAGRES TR8 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  MILAGRES TR 69/13,8 kV MILAGRES TR7 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 643/2014 28/10/2015 27/10/2032 31,010.18
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 643/2014 29/10/2015 28/10/2032 31,014.05
  MILAGRES IB 13,8 kV MG 500 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,948.27
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 443/2011 28/09/2016 27/09/2033 32,309.94
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 643/2014 29/10/2015 28/10/2032 34,257.24
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBNI REA 5861/2016 2/2/2014 1/2/2042 35,405.55
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RMEL REN 643/2014 29/09/2013 28/09/2041 38,112.57
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RMEL REN 643/2014 26/11/2013 25/11/2041 38,305.19
  MILAGRES IB 69 kV MG 230 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  MILAGRES IB 13,8 kV MG 500 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 44,100.90
  MILAGRES RTL 500 kV 180 Mvar MILAGRES RT3 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 643/2014 27/12/2013 26/12/2048 44,521.06
  MILAGRES MC 13,8 kV TR 69/13,8 kV MILAGRES TR7 CE TR8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  MILAGRES MC 13,8 kV TR 69/13,8 kV MILAGRES TR6 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  MILAGRES MC 13,8 kV TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  MILAGRES MC 13,8 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  MILAGRES MC 13,8 kV TR 13,8/13,8 kV MILAGRES TREG1 CE MC2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  MILAGRES MC 13,8 kV TR 13,8/13,8 kV MILAGRES TREG1 CE MC1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  MILAGRES TR 500/230 kV MILAGRES TR1 CE RB FT TR 500/230 kV MILAGRES TR1 CE 061/2001 IPCA RMEL REN 643/2014 25/08/2013 24/08/2047 50,698.03
  MILAGRES EL 13,8 kV MILAGRES  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  MILAGRES EL 13,8 kV MILAGRES  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  MILAGRES EL 13,8 kV MILAGRES  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54

 

97 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MILAGRES EL 13,8 kV MILAGRES  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  MILAGRES EL 13,8 kV MILAGRES  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  MILAGRES TR 69/13,8 kV MILAGRES TR6 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 52,094.44
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 2460/2010 22/06/2012 21/06/2040 52,872.16
  MILAGRES TR 500/230 kV MILAGRES TR1 CE RB FT TR 500/230 kV MILAGRES TR1 CE 061/2001 IPCA RMEL REN 643/2014 15/12/2013 14/12/2043 53,724.47
  MILAGRES RTB 230 kV 3,33 MVAr MILAGRES RTR1 CE RB FT RTB 230 kV 3,33 MVAr MILAGRES RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,763.78
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBNI REA 3578/2012 26/01/2016 25/01/2046 59,883.34
  MILAGRES IB 69 kV MG 230 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  MILAGRES MC 13,8 kV TR 69/13,8 kV MILAGRES TR7 CE TR8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 64,170.73
  MILAGRES MC 13,8 kV TR 69/13,8 kV MILAGRES TR6 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 64,170.73
  MILAGRES MC 13,8 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 64,170.73
  MILAGRES MC 13,8 kV RTB 13,8 kV 5 MVAr MILAGRES RT3 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  MILAGRES MC 13,8 kV RTB 13,8 kV 5 MVAr MILAGRES RT1 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  MILAGRES MC 13,8 kV RTB 13,8 kV 10 Mvar MILAGRES RT2 CE RBF FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  MILAGRES MC 69 kV TR 69/13,8 kV MILAGRES TR6 CE TR7 e TR8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MILAGRES MC 69 kV TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MILAGRES MC 69 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBNI REA 7761/2019 7/10/2021 6/10/2036 67,304.11
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-1 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBNI REA 7761/2019 7/10/2021 6/10/2036 67,721.33
  MILAGRES TR 69/13,8 kV MILAGRES TR6 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 71,910.36
  MILAGRES MC 69 kV BC 69 kV 20,3 Mvar MILAGRES BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  MILAGRES EL 69 kV MILAGRES  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MILAGRES EL 69 kV MILAGRES  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MILAGRES EL 69 kV MILAGRES  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MILAGRES EL 69 kV MILAGRES  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MILAGRES EL 69 kV MILAGRES  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MILAGRES EL 69 kV MILAGRES  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MILAGRES EL 69 kV MILAGRES  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MILAGRES EL 69 kV MILAGRES  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MILAGRES RTB 230 kV 3,33 MVAr MILAGRES RTR1 CE RB FT RTB 230 kV 3,33 MVAr MILAGRES RTR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 78,355.85
  MILAGRES RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBNI REA 3929/2013 4/11/2015 3/11/2041 89,276.19
  MILAGRES MC 13,8 kV RTB 13,8 kV 5 MVAr MILAGRES RT3 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 89,933.61
  MILAGRES MC 13,8 kV RTB 13,8 kV 5 MVAr MILAGRES RT1 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 89,933.61
  MILAGRES MC 13,8 kV RTB 13,8 kV 10 Mvar MILAGRES RT2 CE RBF FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 89,933.61
  MILAGRES MC 69 kV TR 69/13,8 kV MILAGRES TR6 CE TR7 e TR8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  MILAGRES MC 69 kV TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  MILAGRES MC 69 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  MILAGRES TT 69/13,8 kV MILAGRES TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  MILAGRES TR 13,8/13,8 kV MILAGRES TREG1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,840.14
  MILAGRES MC 230 kV RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBNI REA 3929/2013 4/11/2015 3/11/2046 95,595.14
  MILAGRES MC 230 kV RTL 230 kV 10 MVAr MILAGRES RT3 CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  MILAGRES MC 230 kV RTL 230 kV 10 MVAr MILAGRES RT2 CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  MILAGRES MC 230 kV RTL 230 kV 10 MVAr MILAGRES RT1 CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  MILAGRES IB 13,8 kV MG 500 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 96,738.53
  MILAGRES MC 69 kV BC 69 kV 20,3 Mvar MILAGRES BC1 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  MILAGRES EL 69 kV MILAGRES  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MILAGRES EL 69 kV MILAGRES  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MILAGRES EL 69 kV MILAGRES  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MILAGRES EL 69 kV MILAGRES  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MILAGRES EL 69 kV MILAGRES  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MILAGRES EL 69 kV MILAGRES  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MILAGRES MC 230 kV TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBNI REA 3578/2012 7/6/2016 6/6/2048 106,668.03
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBNI REA 3578/2012 14/12/2015 13/12/2048 106,804.16
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RBNI REA 3578/2012 1/2/2016 31/01/2049 107,172.55
  MILAGRES MC 230 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBNI REA 3578/2012 12/4/2016 11/4/2049 107,706.35
  MILAGRES BC 69 kV 20,3 Mvar MILAGRES BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,338.74
  MILAGRES IB 230 kV MG 230 kV MILAGRES MG1 CE IB1 RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  MILAGRES RTB 13,8 kV 5 MVAr MILAGRES RT3 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  MILAGRES RTB 13,8 kV 5 MVAr MILAGRES RT1 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  MILAGRES IB 69 kV MG 230 kV MILAGRES MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  MILAGRES MC 13,8 kV TR 69/13,8 kV MILAGRES TR7 CE TR8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 140,763.15
  MILAGRES MC 230 kV RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,194.51
  MILAGRES RTB 13,8 kV 10 Mvar MILAGRES RT2 CE RBF FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 149,497.60
  MILAGRES MC 230 kV TR 500/230 kV MILAGRES TR1 CE RB FT TR 500/230 kV MILAGRES TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MILAGRES MC 230 kV TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MILAGRES MC 230 kV TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MILAGRES MC 230 kV CE 58/-35 MvAr MILAGRES CE1 CE CE2 RB FT CE 58/-35 MvAr MILAGRES CE1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 157,363.60
  MILAGRES TR 69/13,8 kV MILAGRES TR6 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 157,740.60
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 2173/2009 15/08/2012 14/08/2040 159,648.92
  MILAGRES IB 230 kV MG 230 kV MILAGRES MG1 CE IB1 RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 166,420.18
  MILAGRES RTS 13,8 kV 18,75 Mvar MILAGRES RT1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 166,731.77
  MILAGRES EL 230 kV MILAGRES LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBNI REA 3578/2012 7/6/2016 6/6/2048 167,150.46
  MILAGRES RTL 230 kV 10 MVAr MILAGRES RT3 CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  MILAGRES RTL 230 kV 10 MVAr MILAGRES RT2 CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  MILAGRES RTL 230 kV 10 MVAr MILAGRES RT1 CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 173,549.34
  MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 173,549.34
  MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  MILAGRES RTB 13,8 kV 5 MVAr MILAGRES RT1 CE RBF FT RTB 13,8 kV 5 MVAr MILAGRES RT1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 183,243.57
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 2891/2011 15/12/2014 14/12/2042 196,828.05
  MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,444.63
  MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,444.63

 

98 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MILAGRES RTB 13,8 kV 10 Mvar MILAGRES RT2 CE RBF FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 206,364.16
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-2 CE RB FT LT 230 kV MILAGRES /BANABUIU C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /BANABUIU C-1 CE RB FT LT 230 kV MILAGRES /BANABUIU C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MILAGRES EL 230 kV MILAGRES LT 230 kV ICO /MILAGRES C-1 CE RB FT LT 230 kV ICO /MILAGRES C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-1 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MILAGRES RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 225,193.73
  MILAGRES MC 69 kV BC 69 kV 20,3 Mvar MILAGRES BC1 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  MILAGRES EL 69 kV MILAGRES  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  MILAGRES EL 69 kV MILAGRES  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  MILAGRES EL 69 kV MILAGRES  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  MILAGRES RTL 230 kV 10 MVAr MILAGRES RT3 CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 235,326.42
  MILAGRES RTL 230 kV 10 MVAr MILAGRES RT1 CE RB FT LT 230 kV BOM NOME /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 235,326.42
  MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 239,564.81
  MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 239,564.81
  MILAGRES RTB 500 kV 40 MVAr MILAGRES RTR1 CE RB FT RTB 500 kV 40 MVAr MILAGRES RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 249,484.75
  MILAGRES MC 500 kV RTL 500 kV 180 Mvar MILAGRES RT3 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  MILAGRES MC 500 kV RTL 500 kV 120 Mvar MILAGRES RT1 CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,310.27
  MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,310.27
  MILAGRES TT 69/13,8 kV MILAGRES TA2 CE DIT   061/2001 IPCA RCDM REA 2460/2010 22/06/2012 21/06/2042 275,486.22
  MILAGRES RTL 500 kV 60 Mvar MILAGRES RTR2 CE RB FT RTL 500 kV 60 Mvar MILAGRES RTR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,025.77
  MILAGRES MC 69 kV TT 69/13,8 kV MILAGRES TA2 CE DIT   061/2001 IPCA RCDM REA 2460/2010 22/06/2012 21/06/2043 296,692.95
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-1 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-1 CE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-3 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  MILAGRES RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 310,853.92
  MILAGRES RTB 500 kV 99,1 MVAr MILAGRES RT2 CE RB FT RTB 500 kV 99,1 MVAr MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 326,772.15
  MILAGRES RTL 500 kV 180 Mvar MILAGRES RT3 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 360,939.85
  MILAGRES TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MILAGRES TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 395,132.42
  MILAGRES RTS 13,8 kV 5 Mvar MILAGRES RT3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 395,132.42
  MILAGRES MC 500 kV RTB 500 kV 99,1 MVAr MILAGRES RT2 CE RB FT RTB 500 kV 99,1 MVAr MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,921.40
  MILAGRES MC 69 kV TR 230/69 kV MILAGRES TR9 CE RBF FT TR 230/69 kV MILAGRES TR9 CE 061/2001 IPCA RBNI REA 2173/2009 15/08/2012 14/08/2042 405,243.90
  MILAGRES RTB 13,8 kV 10 Mvar MILAGRES RT2 CE RBF FT RTB 13,8 kV 10 Mvar MILAGRES RT2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 452,674.78
  MILAGRES MC 500 kV TR 500/230 kV MILAGRES TR3 CE RB FT TR 500/230 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  MILAGRES EL 500 kV MILAGRES LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  MILAGRES TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  MILAGRES TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  MILAGRES RTL 230 kV 10 MVAr MILAGRES RT3 CE RB FT LT 230 kV BOM NOME /MILAGRES C-3 PE/CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 516,205.60
  MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 525,502.83
  MILAGRES MC 230 kV BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 525,502.83
  MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC2 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 603,913.08
  MILAGRES BC 230 kV 50,5 MVAr MILAGRES BC1 CE RB FT BC 230 kV 50,5 MVAr MILAGRES BC1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 603,913.08
  MILAGRES EL 230 kV MILAGRES LT 230 kV BOM NOME /MILAGRES C-2 PE/CE RB FT LT 230 kV BOM NOME /MILAGRES C-2 PE/CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  MILAGRES RTB 230 kV 20 MVAr MILAGRES RT4 CE RB FT RTB 230 kV 20 MVAr MILAGRES RT4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 681,880.68
  MILAGRES MG 500 kV MILAGRES MG1 CE RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 2891/2011 15/12/2014 14/12/2043 742,989.80
  MILAGRES RTL 500 kV 120 Mvar MILAGRES RT1 CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 748,454.25
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /TAUA II C-1 CE RB FT LT 230 kV MILAGRES /TAUA II C-1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 4/3/2035 808,139.75
  MILAGRES MG 500 kV MILAGRES MG1 CE RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 3929/2013 29/04/2016 28/04/2045 972,782.53
  MILAGRES MC 230 kV TR 230/69 kV MILAGRES TR9 CE RBF FT TR 230/69 kV MILAGRES TR9 CE 061/2001 IPCA RBNI REA 2173/2009 15/08/2012 14/08/2042 1,039,829.85
  MILAGRES MC 230 kV TR 500/230 kV MILAGRES TR3 CE RB FT TR 500/230 kV MILAGRES TR3 CE 061/2001 IPCA RBNI REA 3929/2013 29/04/2016 28/04/2047 1,083,297.24
  MILAGRES MC 230 kV TR 500/230 kV MILAGRES TR2 CE RB FT TR 500/230 kV MILAGRES TR2 CE 061/2001 IPCA RBNI REA 2891/2011 9/2/2015 8/2/2045 1,106,616.99
  MILAGRES TR 230/69 kV MILAGRES TR4 CE RBF FT TR 230/69 kV MILAGRES TR4 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  MILAGRES TR 230/69 kV MILAGRES TR3 CE RBF FT TR 230/69 kV MILAGRES TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  MILAGRES EL 230 kV MILAGRES LT 230 kV MILAGRES /COREMAS C-2 CE/PB RB FT LT 230 kV MILAGRES /COREMAS C-2 CE/PB 008/2005 IGPM RBL CC 008/2005 25/09/2009 4/3/2035 1,200,466.92
  MILAGRES TR 230/69 kV MILAGRES TR9 CE RBF FT TR 230/69 kV MILAGRES TR9 CE 061/2001 IPCA RBNI REA 2173/2009 15/08/2012 14/08/2046 1,339,486.11
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,354,220.43
  MILAGRES CE 58/-35 MvAr MILAGRES CE2 CE RB FT CE 58/-35 MvAr MILAGRES CE2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,537,262.09
  MILAGRES CE 58/-35 MvAr MILAGRES CE1 CE RB FT CE 58/-35 MvAr MILAGRES CE1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,537,262.09
  MILAGRES IB 500 kV MG 500 kV MILAGRES MG1 CE IB1 RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 2891/2011 15/12/2014 14/12/2045 1,782,181.23
  MILAGRES IB 500 kV MG 500 kV MILAGRES MG1 CE IB3 RB FT MG 500 kV MILAGRES MG1 CE 061/2001 IPCA RBNI REA 3929/2013 29/04/2016 28/04/2047 1,840,316.35
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,869,344.81
  MILAGRES MC 500 kV TR 500/230 kV MILAGRES TR2 CE RB FT TR 500/230 kV MILAGRES TR2 CE 061/2001 IPCA RBNI REA 2891/2011 9/2/2015 8/2/2046 1,878,433.92
  MILAGRES TR 500/230 kV MILAGRES TR1 CE RB FT TR 500/230 kV MILAGRES TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  MILAGRES CE 58/-35 MvAr MILAGRES CE2 CE RB FT CE 58/-35 MvAr MILAGRES CE2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,122,012.67
  MILAGRES CE 58/-35 MvAr MILAGRES CE1 CE RB FT CE 58/-35 MvAr MILAGRES CE1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,122,012.67
  MILAGRES MG 230 kV MILAGRES MG1 CE RB FT MG 230 kV MILAGRES MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,100,543.72
  MILAGRES CE 58/-35 MvAr MILAGRES CE2 CE RB FT CE 58/-35 MvAr MILAGRES CE2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,654,789.03
  MILAGRES CE 58/-35 MvAr MILAGRES CE1 CE RB FT CE 58/-35 MvAr MILAGRES CE1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,654,789.03
  MILAGRES TR 500/230 kV MILAGRES TR2 CE RB FT TR 500/230 kV MILAGRES TR2 CE 061/2001 IPCA RBNI REA 2891/2011 9/2/2015 8/2/2050 5,278,850.31
  MILAGRES TR 500/230 kV MILAGRES TR3 CE RB FT TR 500/230 kV MILAGRES TR3 CE 061/2001 IPCA RBNI REA 3929/2013 29/04/2016 28/04/2051 5,417,391.63
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RMEL REN 443/2011 4/4/2016 3/4/2044 2,213.36
  MIRUEIRA EL 69 kV MIRUEIRA  DIS13 DIT   061/2001 IPCA RMEL REN 443/2011 18/04/2016 17/04/2043 2,264.88
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RMEL REN 643/2014 9/11/2015 8/11/2043 2,279.84
  MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE DIT   061/2001 IPCA RMEL REN 643/2014 9/11/2015 8/11/2043 2,279.84
  MIRUEIRA EL 69 kV MIRUEIRA  DIST9 DIT   061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2043 2,318.82
  MIRUEIRA EL 69 kV MIRUEIRA  DIST6 DIT   061/2001 IPCA RMEL REN 643/2014 29/06/2015 28/06/2043 2,328.41
  MIRUEIRA EL 69 kV MIRUEIRA  DIST2 DIT   061/2001 IPCA RMEL REN 643/2014 29/06/2015 28/06/2043 2,328.41
  MIRUEIRA EL 69 kV MIRUEIRA  DIST7 DIT   061/2001 IPCA RMEL REN 643/2014 6/7/2015 5/7/2045 4,275.22
  MIRUEIRA EL 69 kV MIRUEIRA  DIST7 DIT   061/2001 IPCA RMEL REN 643/2014 8/7/2015 7/7/2045 4,275.89
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RMEL REN 643/2014 9/11/2015 8/11/2043 4,559.68
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RMEL REN 643/2014 10/11/2015 9/11/2043 4,560.05

 

99 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR3 PE RBF FT TR 230/69 kV MIRUEIRA TR3 PE 061/2001 IPCA RMEL REN 643/2014 10/11/2015 9/11/2043 4,560.05
  MIRUEIRA EL 69 kV MIRUEIRA  DIST8 DIT   061/2001 IPCA RMEL REN 643/2014 1/7/2015 30/06/2043 4,628.88
  MIRUEIRA EL 69 kV MIRUEIRA  DIST1 DIT   061/2001 IPCA RMEL REN 643/2014 2/7/2015 1/7/2043 4,629.25
  MIRUEIRA EL 69 kV MIRUEIRA  DIST5 DIT   061/2001 IPCA RMEL REN 643/2014 3/7/2015 2/7/2043 4,629.64
  MIRUEIRA EL 69 kV MIRUEIRA  DIST6 DIT   061/2001 IPCA RMEL REN 643/2014 7/7/2015 6/7/2043 4,631.16
  MIRUEIRA EL 69 kV MIRUEIRA  DIST9 DIT   061/2001 IPCA RMEL REN 643/2014 9/7/2015 8/7/2043 4,631.92
  MIRUEIRA EL 69 kV MIRUEIRA  DIST8 DIT   061/2001 IPCA RMEL REN 643/2014 10/7/2015 9/7/2043 4,632.31
  MIRUEIRA EL 69 kV MIRUEIRA  DIST4 DIT   061/2001 IPCA RMEL REN 643/2014 13/07/2015 12/7/2043 4,633.44
  MIRUEIRA EL 69 kV MIRUEIRA  DIST3 DIT   061/2001 IPCA RMEL REN 643/2014 17/06/2015 16/06/2043 4,652.20
  MIRUEIRA EL 69 kV MIRUEIRA  DIST3 DIT   061/2001 IPCA RMEL REN 643/2014 18/06/2015 17/06/2043 4,652.59
  MIRUEIRA IB 69 kV MG 230 kV MIRUEIRA MG1 PE IB1 DIT   061/2001 IPCA RMEL REN 643/2014 19/06/2015 18/06/2043 4,652.97
  MIRUEIRA EL 69 kV MIRUEIRA  DIST4 DIT   061/2001 IPCA RMEL REN 643/2014 22/06/2015 21/06/2043 4,654.11
  MIRUEIRA EL 69 kV MIRUEIRA  DIST5 DIT   061/2001 IPCA RMEL REN 643/2014 23/06/2015 22/06/2043 4,654.51
  MIRUEIRA EL 69 kV MIRUEIRA  DIST1 DIT   061/2001 IPCA RMEL REN 643/2014 26/06/2015 25/06/2043 4,655.65
  MIRUEIRA EL 69 kV MIRUEIRA  DIST2 DIT   061/2001 IPCA RMEL REN 643/2014 30/06/2015 29/06/2043 4,657.19
  MIRUEIRA EL 69 kV MIRUEIRA  DIS12 DIT   061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2042 7,108.04
  MIRUEIRA EL 69 kV MIRUEIRA  DIS10 DIT   061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2043 9,275.29
  MIRUEIRA EL 69 kV MIRUEIRA  DIS11 DIT   061/2001 IPCA RMEL REN 643/2014 28/07/2015 27/07/2042 9,429.98
  MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RMEL REN 443/2011 24/04/2016 23/04/2046 15,834.93
  MIRUEIRA TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  MIRUEIRA MG 230 kV MIRUEIRA MG1 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 32,197.76
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RMEL REN 643/2014 9/3/2014 8/3/2044 35,982.27
  MIRUEIRA MC 69 kV TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RMEL REN 643/2014 18/12/2013 17/12/2046 36,239.66
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RMEL REN 643/2014 10/11/2013 9/11/2041 38,252.05
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RMEL REN 643/2014 8/12/2013 7/12/2041 38,345.05
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RMEL REN 643/2014 26/01/2014 25/01/2042 38,507.79
  MIRUEIRA TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RMEL REN 643/2014 2/2/2014 1/2/2042 39,388.87
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RBNI REA 2040/2009 7/7/2014 6/7/2044 43,258.88
  MIRUEIRA IB 69 kV MG 230 kV MIRUEIRA MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  MIRUEIRA MC 69 kV TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR3 PE RBF FT TR 230/69 kV MIRUEIRA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  MIRUEIRA EL 69 kV MIRUEIRA  DIST9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MIRUEIRA EL 69 kV MIRUEIRA  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MIRUEIRA EL 69 kV MIRUEIRA  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MIRUEIRA EL 69 kV MIRUEIRA  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MIRUEIRA EL 69 kV MIRUEIRA  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MIRUEIRA EL 69 kV MIRUEIRA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MIRUEIRA EL 69 kV MIRUEIRA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MIRUEIRA EL 69 kV MIRUEIRA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MIRUEIRA EL 69 kV MIRUEIRA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MIRUEIRA EL 69 kV MIRUEIRA  DIS13 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MIRUEIRA EL 69 kV MIRUEIRA  DIS12 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MIRUEIRA EL 69 kV MIRUEIRA  DIS11 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MIRUEIRA EL 69 kV MIRUEIRA  DIS10 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MIRUEIRA MC 69 kV TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 80,679.92
  MIRUEIRA MG 230 kV MIRUEIRA MG1 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/07/2014 29/07/2042 81,214.06
  MIRUEIRA TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  MIRUEIRA EL 69 kV MIRUEIRA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MIRUEIRA EL 69 kV MIRUEIRA  DIS13 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MIRUEIRA EL 69 kV MIRUEIRA  DIS12 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MIRUEIRA BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,338.74
  MIRUEIRA BC 69 kV 20,3 Mvar MIRUEIRA BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,338.74
  MIRUEIRA IB 230 kV MG 230 kV MIRUEIRA MG1 PE IB1 RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR3 PE RBF FT TR 230/69 kV MIRUEIRA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MIRUEIRA MC 230 kV TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MIRUEIRA IB 230 kV MG 230 kV MIRUEIRA MG1 PE IB1 RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 166,420.18
  MIRUEIRA MC 69 kV TR 69/13,8 kV MIRUEIRA TR5 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 176,977.27
  MIRUEIRA MC 69 kV TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  MIRUEIRA TT 69/13,8 kV MIRUEIRA TA2 PE DIT   061/2001 IPCA RCDM REA 3578/2012 14/06/2016 13/06/2046 219,919.57
  MIRUEIRA TT 69/13,8 kV MIRUEIRA TA1 PE DIT   061/2001 IPCA RCDM REA 3578/2012 14/06/2016 13/06/2046 219,919.57
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC2 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  MIRUEIRA MC 69 kV BC 69 kV 20,3 Mvar MIRUEIRA BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  MIRUEIRA EL 69 kV MIRUEIRA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  MIRUEIRA IB 230 kV MG 230 kV MIRUEIRA MG1 PE IB1 RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 365,054.76
  MIRUEIRA TR 230/69 kV MIRUEIRA TR4 PE RBF FT TR 230/69 kV MIRUEIRA TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MIRUEIRA TR 230/69 kV MIRUEIRA TR3 PE RBF FT TR 230/69 kV MIRUEIRA TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MIRUEIRA TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MIRUEIRA TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MIRUEIRA TR 230/69 kV MIRUEIRA TR3 PE RBF FT TR 230/69 kV MIRUEIRA TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41

 

100 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MIRUEIRA TR 230/69 kV MIRUEIRA TR2 PE RBF FT TR 230/69 kV MIRUEIRA TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  MIRUEIRA TR 230/69 kV MIRUEIRA TR1 PE RBF FT TR 230/69 kV MIRUEIRA TR1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  MIRUEIRA MG 230 kV MIRUEIRA MG1 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 661,990.92
  MIRUEIRA EL 230 kV MIRUEIRA LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  MIRUEIRA MG 230 kV MIRUEIRA MG1 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 913,801.97
  MIRUEIRA MG 230 kV MIRUEIRA MG1 PE RB FT MG 230 kV MIRUEIRA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,004,491.05
  MIRUEIRA II TT 69/0 kV MIRUEIRA II TT1 PE DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 1/6/2042 64,133.35
  MIRUEIRA II MC 69 kV TT 69/0 kV MIRUEIRA II TT1 PE DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 1/6/2042 66,693.13
  MIRUEIRA II IB 69 kV MG 230 kV MIRUEIRA II MG1 PE IB1 DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 1/6/2042 107,416.18
  MIRUEIRA II EL 230 kV MIRUEIRA II LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBNI REA 10092/2021 11/3/2021 11/3/2049 147,475.09
  MIRUEIRA II EL 230 kV MIRUEIRA II LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RBNI REA 10092/2021 11/3/2021 11/3/2049 147,475.09
  MIRUEIRA II EL 69 kV MIRUEIRA II  DIST4 DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 1/6/2042 184,190.98
  MIRUEIRA II EL 69 kV MIRUEIRA II  DIST3 DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 1/6/2042 184,190.98
  MIRUEIRA II EL 69 kV MIRUEIRA II  DIST2 DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 1/6/2042 184,190.98
  MIRUEIRA II EL 69 kV MIRUEIRA II  DIST1 DIT   017/2012 IPCA RPEC CC 017/2012 15/08/2016 1/6/2042 184,190.98
  MIRUEIRA II IB 230 kV MG 230 kV MIRUEIRA II MG1 PE IB1 RB FT MG 230 kV MIRUEIRA II MG1 PE 017/2012 IPCA RBL CC 017/2012 12/4/2016 1/6/2042 453,501.71
  MIRUEIRA II MC 69 kV TR 230/69 kV MIRUEIRA II TR2 PE RBF FT TR 230/69 kV MIRUEIRA II TR2 PE 017/2012 IPCA RBL CC 017/2012 12/4/2016 1/6/2042 493,975.19
  MIRUEIRA II MC 69 kV TR 230/69 kV MIRUEIRA II TR1 PE RBF FT TR 230/69 kV MIRUEIRA II TR1 PE 017/2012 IPCA RBL CC 017/2012 12/4/2016 1/6/2042 493,975.19
  MIRUEIRA II MC 230 kV TR 230/69 kV MIRUEIRA II TR2 PE RBF FT TR 230/69 kV MIRUEIRA II TR2 PE 017/2012 IPCA RBL CC 017/2012 12/4/2016 1/6/2042 520,960.84
  MIRUEIRA II MC 230 kV TR 230/69 kV MIRUEIRA II TR1 PE RBF FT TR 230/69 kV MIRUEIRA II TR1 PE 017/2012 IPCA RBL CC 017/2012 12/4/2016 1/6/2042 520,960.84
  MIRUEIRA II MG 230 kV MIRUEIRA II MG1 PE RB FT MG 230 kV MIRUEIRA II MG1 PE 017/2012 IPCA RBL CC 017/2012 12/4/2016 1/6/2042 1,352,988.32
  MIRUEIRA II TR 230/69 kV MIRUEIRA II TR2 PE RBF FT TR 230/69 kV MIRUEIRA II TR2 PE 017/2012 IPCA RBL CC 017/2012 12/4/2016 1/6/2042 1,622,582.57
  MIRUEIRA II TR 230/69 kV MIRUEIRA II TR1 PE RBF FT TR 230/69 kV MIRUEIRA II TR1 PE 017/2012 IPCA RBL CC 017/2012 12/4/2016 1/6/2042 1,622,582.57
  MOD.REDUZIDO MG 69 kV MOD.REDUZIDO MG1 BA DIT   061/2001 IPCA RMEL REN 443/2011 9/9/2016 8/9/2033 18,179.72
  MOD.REDUZIDO TR 69/13,8 kV MOD.REDUZIDO TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  MOD.REDUZIDO EL 13,8 kV MOD.REDUZIDO  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  MOD.REDUZIDO EL 13,8 kV MOD.REDUZIDO  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  MOD.REDUZIDO EL 13,8 kV MOD.REDUZIDO  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  MOD.REDUZIDO EL 69 kV MOD.REDUZIDO LT 69 kV MOD.REDUZIDO /ABAIXADORA C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,128.71
  MOD.REDUZIDO MG 69 kV MOD.REDUZIDO MG1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 198,107.56
  MOD.REDUZIDO TR 69/13,8 kV MOD.REDUZIDO TR1 BA DIT   061/2001 IPCA RCDM REA 2460/2010 1/8/2012 31/07/2045 439,712.92
  MORRO CHAPEU II MC 69 kV TT 69/0 kV MORRO CHAPEU II TA1 BA ICG   009/2011 IPCA RICG CC 009/2011 6/8/2017 13/10/2041 73,888.01
  MORRO CHAPEU II MG 69 kV MORRO CHAPEU II MG1 BA ICG   009/2011 IPCA RICG CC 009/2011 6/8/2017 13/10/2041 75,873.06
  MORRO CHAPEU II IB 69 kV MG 69 kV MORRO CHAPEU II MG1 BA IB1 ICG   009/2011 IPCA RICG CC 009/2011 6/8/2017 13/10/2041 120,025.60
  MORRO CHAPEU II MC 69 kV TR 230/69 kV MORRO CHAPEU II TR1 BA ICG   009/2011 IPCA RICG CC 009/2011 6/8/2017 13/10/2041 175,072.59
  MORRO CHAPEU II TT 69/0 kV MORRO CHAPEU II TA1 BA ICG   009/2011 IPCA RICG CC 009/2011 6/8/2017 13/10/2041 198,481.77
  MORRO CHAPEU II IB 230 kV MG 230 kV MORRO CHAPEU II MG1 BA IB1 RB FT MG 230 kV MORRO CHAPEU II MG1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041 256,458.86
  MORRO CHAPEU II MC 230 kV RTB 230 kV 0 Mvar MORRO CHAPEU II RT1 BA RB FT RTB 230 kV 20 Mvar MORRO CHAPEU II RT1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041 326,027.75
  MORRO CHAPEU II MC 230 kV TR 230/69 kV MORRO CHAPEU II TR1 BA ICG   009/2011 IPCA RICG CC 009/2011 6/8/2017 13/10/2041 430,418.85
  MORRO CHAPEU II RTB 230 kV 0 Mvar MORRO CHAPEU II RT1 BA RB FT RTB 230 kV 20 Mvar MORRO CHAPEU II RT1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041 475,511.05
  MORRO CHAPEU II EL 230 kV MORRO CHAPEU II LT 230 kV MORRO CHAPEU II /IRECE C-1 BA RB FT LT 230 kV MORRO CHAPEU II /IRECE C-1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041 492,375.07
  MORRO CHAPEU II MG 230 kV MORRO CHAPEU II MG1 BA RB FT MG 230 kV MORRO CHAPEU II MG1 BA 009/2011 IPCA RBL CC 009/2011 21/12/2017 13/10/2041 724,964.50
  MORRO CHAPEU II TR 230/69 kV MORRO CHAPEU II TR1 BA ICG   009/2011 IPCA RICG CC 009/2011 6/8/2017 13/10/2041 1,358,364.43
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RMEL REN 443/2011 12/5/2016 11/5/2030 1,621.71
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN 061/2001 IPCA RMEL REN 443/2011 12/5/2016 11/5/2030 1,621.71
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RMEL REN 443/2011 12/5/2016 11/5/2030 1,621.71
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN 061/2001 IPCA RMEL REN 443/2011 12/5/2016 11/5/2030 1,621.71
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN 061/2001 IPCA RMEL REN 443/2011 12/5/2016 11/5/2030 1,621.71
  MOSSORO II TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RMEL REN 443/2011 23/04/2015 22/04/2038 2,246.01
  MOSSORO II EL 69 kV MOSSORO II  MOSSOROIII-02J2 DIT   061/2001 IPCA RMEL REN 443/2011 10/5/2016 9/5/2030 3,242.54
  MOSSORO II EL 69 kV MOSSORO II  MOSSORO I-02J3 DIT   061/2001 IPCA RMEL REN 443/2011 10/5/2016 9/5/2030 3,242.54
  MOSSORO II EL 69 kV MOSSORO II  GROSSOS-02J6 DIT   061/2001 IPCA RMEL REN 443/2011 10/5/2016 9/5/2030 3,242.54
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN 061/2001 IPCA RMEL REN 443/2011 12/5/2016 11/5/2030 3,243.41
  MOSSORO II EL 69 kV MOSSORO II  BARROCAS-02J4 DIT   061/2001 IPCA RMEL REN 443/2011 10/5/2016 9/5/2030 3,347.30
  MOSSORO II TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RMEL REN 443/2011 23/04/2015 22/04/2038 4,492.02
  MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RMEL REN 443/2011 23/01/2015 22/01/2038 14,029.19
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2046 15,868.54
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2046 15,868.54
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2046 15,868.54
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2046 15,868.54
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RMEL REN 643/2014 30/08/2013 29/08/2030 25,835.80
  MOSSORO II MC 69 kV TT 69/13,8 kV MOSSORO II TA1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RMEL REN 443/2011 21/01/2016 20/01/2033 31,339.00
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RMEL REN 643/2014 30/04/2014 29/04/2042 38,819.96
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV ALEX /MOSSORO II C-1 CE/RN RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2042 39,530.65
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 42,730.34
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 42,730.34
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 42,730.34
  MOSSORO II BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 42,730.34
  MOSSORO II IB 69 kV MG 230 kV MOSSORO II MG1 RN IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  MOSSORO II MC 13,8 kV TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  MOSSORO II MC 13,8 kV TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBNI REA 2376/2010 23/10/2014 22/10/2042 56,400.12
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBNI REA 1814/2009 23/10/2014 22/10/2042 56,400.12
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  MOSSORO II MC 69 kV TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MOSSORO II MC 69 kV TR 230/69 kV MOSSORO II TR3 RN RBF FT TR 230/69 kV MOSSORO II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MOSSORO II MC 69 kV TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MOSSORO II MC 69 kV TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20

 

101 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2047 67,390.27
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RMEL REN 443/2011 7/5/2017 6/5/2047 67,458.89
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RMEL REN 443/2011 29/12/2016 28/12/2044 76,014.43
  MOSSORO II EL 69 kV MOSSORO II  ROSADO-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MOSSORO II EL 69 kV MOSSORO II  MOSSOROIII-02J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MOSSORO II EL 69 kV MOSSORO II  MOSSORO I-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MOSSORO II EL 69 kV MOSSORO II  MAISA-02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MOSSORO II EL 69 kV MOSSORO II  GROSSOS-02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MOSSORO II EL 69 kV MOSSORO II  C.AMARO-02J5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MOSSORO II EL 69 kV MOSSORO II  BARROCAS-02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 89,933.61
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 89,933.61
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 89,933.61
  MOSSORO II MC 69 kV TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  MOSSORO II TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 99,325.69
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC4 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC3 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC2 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  MOSSORO II MC 13,8 kV BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN RBF FT BC 13,8 kV 3,6 MVAr MOSSORO II BC1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  MOSSORO II EL 69 kV MOSSORO II  MOSSORO I-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MOSSORO II EL 69 kV MOSSORO II  MAISA-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MOSSORO II EL 69 kV MOSSORO II  GROSSOS-02J6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MOSSORO II EL 69 kV MOSSORO II  C.AMARO-02J5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2031 115,676.92
  MOSSORO II EL 230 kV MOSSORO II  AREIA BRANCA DIT   061/2001 IPCA RCDM REA 6674/2017 1/7/2018 1/4/2038 124,381.51
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  MOSSORO II TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 137,107.64
  MOSSORO II IB 230 kV MG 230 kV MOSSORO II MG1 RN IB1 RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR3 RN RBF FT TR 230/69 kV MOSSORO II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,275.92
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT2 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,275.92
  MOSSORO II MC 13,8 kV RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,275.92
  MOSSORO II TT 69/13,8 kV MOSSORO II TA1 RN DIT   061/2001 IPCA RCDM REA 3578/2012 10/7/2015 9/7/2045 215,021.66
  MOSSORO II EL 69 kV MOSSORO II  MOSSORO I-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  MOSSORO II EL 69 kV MOSSORO II  MAISA-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV ALEX /MOSSORO II C-1 CE/RN RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBNI REA 3892/2013 12/5/2016 11/5/2044 262,764.81
  MOSSORO II TR 69/3,3 kV MOSSORO II TR5 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 300,755.58
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-1 RN RB FT LT 230 kV MOSSORO II /ACU III C-1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV ALEX /MOSSORO II C-1 CE/RN RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO II /ACU III C-2 RN RB FT LT 230 kV MOSSORO II /ACU III C-2 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040 355,597.70
  MOSSORO II TR 230/69 kV MOSSORO II TR3 RN RBF FT TR 230/69 kV MOSSORO II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MOSSORO II TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MOSSORO II TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 395,132.42
  MOSSORO II RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN RBF FT RTB 13,8 kV 5 MVAr MOSSORO II RT1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 395,132.42
  MOSSORO II MC 69 kV TR 230/69 kV MOSSORO II TR6 RN RBF FT TR 230/69 kV MOSSORO II TR6 RN 061/2001 IPCA RBNI REA 3892/2013 12/5/2016 11/5/2046 444,525.69
  MOSSORO II EL 69 kV MOSSORO II  ROSADO 02J8 DIT   061/2001 IPCA RCDM REA 1814/2009 23/10/2014 22/10/2044 460,217.16
  MOSSORO II EL 69 kV MOSSORO II  BARAUNAS 02J9 DIT   061/2001 IPCA RCDM REA 2376/2010 23/10/2014 22/10/2044 460,217.16
  MOSSORO II TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  MOSSORO II TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV MOSSORO IV /MOSSORO II C-1 RN RB FT LT 230 kV MOSSORO IV /MOSSORO II C-1 RN 018/2012 IPCA RBL CC 018/2012 28/10/2017 1/6/2042 537,773.26
  MOSSORO II CE 20/-0 Mvar MOSSORO II CE1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 553,402.03
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 622,518.15
  MOSSORO II RTB 230 kV 20 Mvar MOSSORO II RT1 RN RB FT RTB 230 kV 20 Mvar MOSSORO II RT1 RN 061/2001 IPCA RBNI REA 3620/2012 26/05/2014 25/05/2047 635,140.40
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV ALEX /MOSSORO II C-1 CE/RN RB FT LT 230 kV ALEX /MOSSORO II C-1 CE/RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  MOSSORO II CE 20/-0 Mvar MOSSORO II CE1 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 763,907.56
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 859,314.37
  MOSSORO II TR 230/69 kV MOSSORO II TR2 RN RBF FT TR 230/69 kV MOSSORO II TR2 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  MOSSORO II TR 230/69 kV MOSSORO II TR1 RN RBF FT TR 230/69 kV MOSSORO II TR1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  MOSSORO II MC 230 kV RTB 230 kV 20 Mvar MOSSORO II RT1 RN RB FT RTB 230 kV 20 Mvar MOSSORO II RT1 RN 061/2001 IPCA RBNI REA 3620/2012 26/05/2014 25/05/2045 1,148,826.70
  MOSSORO II MC 230 kV TR 230/69 kV MOSSORO II TR6 RN RBF FT TR 230/69 kV MOSSORO II TR6 RN 061/2001 IPCA RBNI REA 3892/2013 12/5/2016 11/5/2046 1,220,921.06
  MOSSORO II EL 230 kV MOSSORO II LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN RB FT LT 230 kV BANABUIU /MOSSORO II C-2 CE/RN 061/2001 IPCA RBNI REA 2173/2009 6/6/2016 5/6/2046 1,380,810.77
  MOSSORO II TR 230/69 kV MOSSORO II TR6 RN RBF FT TR 230/69 kV MOSSORO II TR6 RN 061/2001 IPCA RBNI REA 3892/2013 12/5/2016 11/5/2050 1,482,097.60
  MOSSORO II CE 20/-0 Mvar MOSSORO II CE1 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,675,686.75
  MOSSORO II MG 230 kV MOSSORO II MG1 RN RB FT MG 230 kV MOSSORO II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,884,968.53
  MOSSORO IV TT 69/230 kV MOSSORO IV TT1 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 1/6/2042 79,677.44
  MOSSORO IV MC 69 kV TT 69/230 kV MOSSORO IV TT1 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 1/6/2042 82,857.21
  MOSSORO IV IB 69 kV MG 69 kV MOSSORO IV MG2 RN IB1 ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 1/6/2042 133,443.57
  MOSSORO IV MC 69 kV TR 230/69 kV MOSSORO IV TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 1/6/2042 195,725.61
  MOSSORO IV IB 230 kV MG 230 kV MOSSORO IV MG1 RN IB1 RB FT MG 230 kV MOSSORO IV MG1 RN 018/2012 IPCA RBL CC 018/2012 28/10/2017 1/6/2042 332,396.12
  MOSSORO IV MC 230 kV TR 230/69 kV MOSSORO IV TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 1/6/2042 493,544.80
  MOSSORO IV EL 230 kV MOSSORO IV LT 230 kV MOSSORO IV /MOSSORO II C-1 RN RB FT LT 230 kV MOSSORO IV /MOSSORO II C-1 RN 018/2012 IPCA RBL CC 018/2012 28/10/2017 1/6/2042 537,773.26
  MOSSORO IV MG 69 kV MOSSORO IV MG2 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 1/6/2042 566,811.94

 

102 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MOSSORO IV MG 230 kV MOSSORO IV MG1 RN RB FT MG 230 kV MOSSORO IV MG1 RN 018/2012 IPCA RBL CC 018/2012 28/10/2017 1/6/2042 897,063.87
  MOSSORO IV TR 230/69 kV MOSSORO IV TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 28/10/2017 1/6/2042 1,248,628.72
  MOXOTO MG 69 kV MOXOTO MG1 BA DIT   061/2001 IPCA RMEL REN 643/2014 28/02/2014 27/02/2031 16,163.98
  MOXOTO TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  MOXOTO TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  MOXOTO MG 69 kV MOXOTO MG1 BA DIT   061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 30,382.04
  MOXOTO TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  MOXOTO TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  MOXOTO EL 13,8 kV MOXOTO  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  MOXOTO EL 13,8 kV MOXOTO  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  MOXOTO EL 13,8 kV MOXOTO  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  MOXOTO EL 13,8 kV MOXOTO  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  MOXOTO EL 13,8 kV MOXOTO  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  MOXOTO EL 13,8 kV MOXOTO  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  MOXOTO MC 69 kV TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 64,170.73
  MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 64,170.73
  MOXOTO MC 69 kV TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MOXOTO EL 69 kV MOXOTO LT 69 kV ZEBU /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MOXOTO EL 69 kV MOXOTO LT 69 kV ABAIXADORA /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 140,763.15
  MOXOTO MC 13,8 kV TR 69/13,8 kV MOXOTO TR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 140,763.15
  MOXOTO MG 69 kV MOXOTO MG1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 237,578.47
  MOXOTO MG 69 kV MOXOTO MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,949.62
  MOXOTO MG 69 kV MOXOTO MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 719,381.33
  MULUNGU TR 69/13,8 kV MULUNGU TR1-B BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  MULUNGU TR 69/13,8 kV MULUNGU TR1-A BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  MULUNGU MG 69 kV MULUNGU MG1 BA DIT   061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 30,382.04
  MULUNGU TR 69/13,8 kV MULUNGU TR1-B BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  MULUNGU MC 13,8 kV TR 69/13,8 kV MULUNGU TR1-A BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  MULUNGU EL 13,8 kV MULUNGU  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  MULUNGU EL 13,8 kV MULUNGU  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  MULUNGU EL 13,8 kV MULUNGU  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  MULUNGU EL 13,8 kV MULUNGU  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  MULUNGU EL 13,8 kV MULUNGU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  MULUNGU MC 13,8 kV TR 69/13,8 kV MULUNGU TR1-A BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 64,170.73
  MULUNGU EL 13,8 kV MULUNGU  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 71,769.69
  MULUNGU EL 69 kV MULUNGU LT 69 kV ABAIXADORA /MULUNGU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,128.71
  MULUNGU EL 69 kV MULUNGU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,128.71
  MULUNGU TR 69/13,8 kV MULUNGU TR1-B BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  MULUNGU MC 13,8 kV TR 69/13,8 kV MULUNGU TR1-A BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 140,763.15
  MULUNGU MG 69 kV MULUNGU MG1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 217,594.66
  MULUNGU MG 69 kV MULUNGU MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 300,364.28
  MULUNGU MG 69 kV MULUNGU MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 658,870.88
  MUSSURE II EL 69 kV MUSSURE II  MANGABEIRA-02J8 DIT   061/2001 IPCA RCDM REA 2376/2010 26/03/2015 25/03/2045 12,718.00
  MUSSURE II MC 230 kV TR 230/69 kV MUSSURE II TR4 PB RBF FT TR 230/69 kV MUSSURE II TR4 PB 061/2001 IPCA RMEL REN 443/2011 6/7/2017 5/7/2047 21,866.76
  MUSSURE II MC 69 kV TT 69/13,8 kV MUSSURE II TA1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  MUSSURE II TR 69/13,8 kV MUSSURE II TR5 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 15/10/2015 14/10/2032 30,959.89
  MUSSURE II TR 69/13,8 kV MUSSURE II TR5 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  MUSSURE II IB 69 kV MG 230 kV MUSSURE II MG1 PB IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  MUSSURE II MC 69 kV TR 69/13,8 kV MUSSURE II TR5 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  MUSSURE II MC 69 kV TR 230/69 kV MUSSURE II TR4 PB RBF FT TR 230/69 kV MUSSURE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MUSSURE II MC 69 kV TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MUSSURE II MC 69 kV TR 230/69 kV MUSSURE II TR2 PB RBF FT TR 230/69 kV MUSSURE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MUSSURE II MC 69 kV TR 230/69 kV MUSSURE II TR1 PB RBF FT TR 230/69 kV MUSSURE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 70,133.46
  MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RMEL REN 643/2014 30/09/2015 29/09/2043 73,277.16
  MUSSURE II MC 69 kV BC 69 kV 21,3 Mvar MUSSURE II BC1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  MUSSURE II MC 69 kV BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  MUSSURE II EL 69 kV MUSSURE II  SANTA RITA-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MUSSURE II EL 69 kV MUSSURE II  MUSSURE I-12J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MUSSURE II EL 69 kV MUSSURE II  MANGABEIRA-02J8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MUSSURE II EL 69 kV MUSSURE II  J.PESSOA-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MUSSURE II EL 69 kV MUSSURE II  ILHA BISTO-02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MUSSURE II EL 69 kV MUSSURE II  CRISTO-02J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  MUSSURE II MC 69 kV TR 69/13,8 kV MUSSURE II TR5 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 80,679.92
  MUSSURE II TR 69/13,8 kV MUSSURE II TR5 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  MUSSURE II MC 69 kV TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  MUSSURE II TT 69/13,8 kV MUSSURE II TA2 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  MUSSURE II TT 69/13,8 kV MUSSURE II TA1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  MUSSURE II MC 69 kV BC 69 kV 21,3 Mvar MUSSURE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  MUSSURE II MC 69 kV BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  MUSSURE II EL 69 kV MUSSURE II  MUSSURE I-12J6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MUSSURE II EL 69 kV MUSSURE II  MANGABEIRA-02J8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MUSSURE II EL 69 kV MUSSURE II  ILHA BISTO-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  MUSSURE II BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 115,654.60
  MUSSURE II BC 69 kV 21,3 Mvar MUSSURE II BC1 PB DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,014.30
  MUSSURE II IB 230 kV MG 230 kV MUSSURE II MG1 PB IB1 RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  MUSSURE II MC 230 kV TR 230/69 kV MUSSURE II TR4 PB RBF FT TR 230/69 kV MUSSURE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MUSSURE II MC 230 kV TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MUSSURE II MC 230 kV TR 230/69 kV MUSSURE II TR2 PB RBF FT TR 230/69 kV MUSSURE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MUSSURE II MC 230 kV TR 230/69 kV MUSSURE II TR1 PB RBF FT TR 230/69 kV MUSSURE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  MUSSURE II BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 159,647.81

 

103 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MUSSURE II BC 69 kV 21,3 Mvar MUSSURE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 160,144.34
  MUSSURE II EL 230 kV MUSSURE II LT 230 kV SANTA RITA II /MUSSURE II C-1 PB RB FT LT 230 kV SANTA RITA II /MUSSURE II C-1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MUSSURE II EL 230 kV MUSSURE II LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB RB FT LT 230 kV GOIANINHA /MUSSURE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  MUSSURE II MC 69 kV BC 69 kV 21,3 Mvar MUSSURE II BC1 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  MUSSURE II MC 69 kV BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  MUSSURE II EL 69 kV MUSSURE II  MUSSURE I-12J6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  MUSSURE II EL 69 kV MUSSURE II  ILHA BISTO-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  MUSSURE II BC 69 kV 21,2 Mvar MUSSURE II BC2 PB DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 350,199.07
  MUSSURE II TR 230/69 kV MUSSURE II TR4 PB RBF FT TR 230/69 kV MUSSURE II TR4 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MUSSURE II TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MUSSURE II TR 230/69 kV MUSSURE II TR2 PB RBF FT TR 230/69 kV MUSSURE II TR2 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MUSSURE II TR 230/69 kV MUSSURE II TR1 PB RBF FT TR 230/69 kV MUSSURE II TR1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  MUSSURE II TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  MUSSURE II TR 230/69 kV MUSSURE II TR2 PB RBF FT TR 230/69 kV MUSSURE II TR2 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  MUSSURE II TR 230/69 kV MUSSURE II TR1 PB RBF FT TR 230/69 kV MUSSURE II TR1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 594,396.04
  MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 820,495.04
  MUSSURE II TR 230/69 kV MUSSURE II TR3 PB RBF FT TR 230/69 kV MUSSURE II TR3 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  MUSSURE II MG 230 kV MUSSURE II MG1 PB RB FT MG 230 kV MUSSURE II MG1 PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,799,815.52
  N.S.SOCORRO MG 230 kV N.S.SOCORRO MG2 SE RB FT MG 230 kV N.S.SOCORRO MG2 SE 061/2001 IPCA RBNI DSP 1080/2022 1/7/2022 30/06/2053 19,366.15
  N.S.SOCORRO MG 230 kV N.S.SOCORRO MG3 SE RB FT MG 230 kV N.S.SOCORRO MG3 SE 005/2008 IPCA RBNI DSP 1414/2022 1/7/2022 30/06/2053 19,890.65
  N.S.SOCORRO MG 230 kV N.S.SOCORRO MG1 SE RB FT MG 230 kV N.S.SOCORRO MG1 SE 005/2012 IPCA RBNI REN 905/2020 5/7/2020 4/7/2048 37,863.73
  N.S.SOCORRO MC 69 kV TT 69/0 kV N.S.SOCORRO TT1 SE DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/5/2042 63,256.60
  N.S.SOCORRO IB 69 kV MG 230 kV N.S.SOCORRO MG1 SE IB1 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/5/2042 102,913.08
  N.S.SOCORRO TT 69/0 kV N.S.SOCORRO TT1 SE DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/5/2042 169,760.92
  N.S.SOCORRO EL 69 kV N.S.SOCORRO  DIST5 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/5/2042 175,190.93
  N.S.SOCORRO EL 69 kV N.S.SOCORRO  DIST4 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/5/2042 175,190.93
  N.S.SOCORRO EL 69 kV N.S.SOCORRO  DIST3 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/5/2042 175,190.93
  N.S.SOCORRO EL 69 kV N.S.SOCORRO  DIST2 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/5/2042 175,190.93
  N.S.SOCORRO EL 69 kV N.S.SOCORRO  DIST1 DIT   005/2012 IPCA RPEC CC 005/2012 17/02/2019 10/5/2042 175,190.93
  N.S.SOCORRO MC 69 kV TR 230/69 kV N.S.SOCORRO TR2 SE RBF FT TR 230/69 kV N.S.SOCORRO TR2 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/5/2042 187,733.84
  N.S.SOCORRO MC 69 kV TR 230/69 kV N.S.SOCORRO TR1 SE RBF FT TR 230/69 kV N.S.SOCORRO TR1 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/5/2042 187,733.84
  N.S.SOCORRO EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /FAFEN C-1 SE RB FT EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /FAFEN C-1 SE 061/2001 IPCA RBNI DSP 1080/2022 1/7/2022 30/06/2051 196,013.94
  N.S.SOCORRO EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL RB FT LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL 005/2008 IPCA RBNI DSP 1414/2022 1/7/2022 30/06/2051 202,076.54
  N.S.SOCORRO IB 230 kV MG 230 kV N.S.SOCORRO MG1 SE IB1 RB FT MG 230 kV N.S.SOCORRO MG1 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/5/2042 402,550.48
  N.S.SOCORRO MC 230 kV TR 230/69 kV N.S.SOCORRO TR2 SE RBF FT TR 230/69 kV N.S.SOCORRO TR2 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/5/2042 461,221.25
  N.S.SOCORRO MC 230 kV TR 230/69 kV N.S.SOCORRO TR1 SE RBF FT TR 230/69 kV N.S.SOCORRO TR1 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/5/2042 461,221.25
  N.S.SOCORRO EL 69 kV N.S.SOCORRO  DIST6 DIT   005/2012 IPCA RCDM REN 905/2020 5/7/2020 4/7/2051 485,632.22
  N.S.SOCORRO EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /JARDIM C-2 SE RB FT LT 230 kV N.S.SOCORRO /JARDIM C-2 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/5/2042 646,895.20
  N.S.SOCORRO EL 230 kV N.S.SOCORRO LT 230 kV N.S.SOCORRO /JARDIM C-1 SE RB FT LT 230 kV N.S.SOCORRO /JARDIM C-1 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/5/2042 646,895.20
  N.S.SOCORRO MG 230 kV N.S.SOCORRO MG1 SE RB FT MG 230 kV N.S.SOCORRO MG1 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/5/2042 1,390,733.64
  N.S.SOCORRO TR 230/69 kV N.S.SOCORRO TR2 SE RBF FT TR 230/69 kV N.S.SOCORRO TR2 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/5/2042 1,453,720.26
  N.S.SOCORRO TR 230/69 kV N.S.SOCORRO TR1 SE RBF FT TR 230/69 kV N.S.SOCORRO TR1 SE 005/2012 IPCA RBL CC 005/2012 17/02/2019 10/5/2042 1,453,720.26
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 443/2011 5/5/2016 4/5/2030 1,819.16
  NATAL II MC 69 kV TT 69/13,8 kV NATAL II TA2 RN DIT   061/2001 IPCA RMEL REN 443/2011 5/5/2016 4/5/2030 1,819.16
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 25,946.62
  NATAL II MC 69 kV TT 69/13,8 kV NATAL II TA2 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  NATAL II MC 69 kV TT 69/13,8 kV NATAL II TA1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  NATAL II TR 69/13,8 kV NATAL II TR5 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  NATAL II MC 69 kV TR 69/3,3 kV NATAL II TR7 RN DIT   061/2001 IPCA RCDM REA 2376/2010 22/08/2013 21/08/2043 32,543.55
  NATAL II MC 69 kV TR 69/3,3 kV NATAL II TR6 RN DIT   061/2001 IPCA RCDM REA 2376/2010 2/9/2013 1/9/2043 32,572.30
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 443/2011 28/01/2016 27/01/2033 34,646.07
  NATAL II TR 69/13,8 kV NATAL II TR5 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  NATAL II IB 69 kV MG 230 kV NATAL II MG1 RN IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 643/2014 30/04/2015 29/04/2043 49,386.17
  NATAL II EL 230 kV NATAL II LT 230 kV PARAISO /NATAL II C-2 RN RB FT LT 230 kV PARAISO /NATAL II C-2 RN 061/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2048 50,414.69
  NATAL II EL 13,8 kV NATAL II  AUXIL1 RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  NATAL II MC 69 kV TR 69/3,3 kV NATAL II TR7 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  NATAL II MC 69 kV TR 69/3,3 kV NATAL II TR6 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  NATAL II MC 69 kV TR 230/69 kV NATAL II TR8 RN RBF FT TR 230/69 kV NATAL II TR8 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  NATAL II MC 69 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  NATAL II MC 69 kV TR 230/69 kV NATAL II TR3 RN RBF FT TR 230/69 kV NATAL II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  NATAL II MC 69 kV TR 230/69 kV NATAL II TR2 RN RBF FT TR 230/69 kV NATAL II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  NATAL II MC 69 kV TR 230/69 kV NATAL II TR1 RN RBF FT TR 230/69 kV NATAL II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC4 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC3 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC2 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 443/2011 29/12/2016 28/12/2044 76,014.43
  NATAL II EL 69 kV NATAL II  RIBEIRA-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  NATAL II EL 69 kV NATAL II  PARNAMIRIM-02J8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  NATAL II EL 69 kV NATAL II  PARNAMIRIM-02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  NATAL II EL 69 kV NATAL II  NEOPOLIS-02J9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  NATAL II EL 69 kV NATAL II  NATAL I-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  NATAL II EL 69 kV NATAL II  IGAPO-02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  NATAL II EL 69 kV NATAL II  IGAPO-02J5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  NATAL II EL 69 kV NATAL II  IGAPO-02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  NATAL II EL 69 kV NATAL II  CENTRO-12J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  NATAL II EL 69 kV NATAL II  RIBEIRA-02J3 DIT   061/2001 IPCA RCDM REA 2040/2009 18/12/2013 17/12/2044 83,177.23
  NATAL II EL 69 kV NATAL II  IGAPO-02J4 DIT   061/2001 IPCA RCDM REA 2040/2009 27/01/2014 26/01/2045 83,437.18
  NATAL II EL 69 kV NATAL II  IGAPO-02J5 DIT   061/2001 IPCA RCDM REA 2040/2009 11/2/2014 10/2/2045 83,534.68
  NATAL II EL 69 kV NATAL II  PARNAMIRIM-02J6 DIT   061/2001 IPCA RCDM REA 2040/2009 21/03/2014 20/03/2045 83,781.65
  NATAL II EL 69 kV NATAL II  NEOPOLIS-02J9 DIT   061/2001 IPCA RCDM REA 2040/2009 21/03/2014 20/03/2045 83,781.65
  NATAL II EL 69 kV NATAL II  CENTRO-12J2 DIT   061/2001 IPCA RCDM REA 2040/2009 21/03/2014 20/03/2045 83,781.65
  NATAL II TR 69/13,8 kV NATAL II TR5 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  NATAL II MC 69 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36

 

104 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  NATAL II TT 69/13,8 kV NATAL II TA2 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  NATAL II MC 230 kV RTL 230 kV 9,9 MVAr NATAL II RT3 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  NATAL II MC 230 kV RTL 230 kV 9,9 MVAr NATAL II RT2 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  NATAL II TR 69/3,3 kV NATAL II TR7 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 99,325.69
  NATAL II TR 69/3,3 kV NATAL II TR6 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 99,325.69
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC4 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC3 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC2 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC1 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  NATAL II EL 69 kV NATAL II  PARNAMIRIM-02J8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  NATAL II EL 69 kV NATAL II  NEOPOLIS-02J9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  NATAL II EL 69 kV NATAL II  IGAPO-02J5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  NATAL II BC 69 kV 21,3 Mvar NATAL II BC4 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,014.30
  NATAL II BC 69 kV 21,3 Mvar NATAL II BC3 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,014.30
  NATAL II BC 69 kV 21,3 Mvar NATAL II BC2 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,014.30
  NATAL II BC 69 kV 21,3 Mvar NATAL II BC1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,014.30
  NATAL II IB 230 kV MG 230 kV NATAL II MG1 RN IB1 RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  NATAL II TT 69/13,8 kV NATAL II TA2 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  NATAL II MC 230 kV RTL 230 kV 9,9 MVAr NATAL II RT3 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 131,974.49
  NATAL II MC 230 kV RTL 230 kV 9,9 MVAr NATAL II RT2 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 131,974.49
  NATAL II TR 69/3,3 kV NATAL II TR7 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 137,107.64
  NATAL II TR 69/3,3 kV NATAL II TR6 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 137,107.64
  NATAL II MC 230 kV TR 230/69 kV NATAL II TR8 RN RBF FT TR 230/69 kV NATAL II TR8 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 143,590.10
  NATAL II MC 230 kV RTB 230 kV 30 MVAr NATAL II RT1 RN RB FT RTB 230 kV 30 MVAr NATAL II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 146,194.51
  NATAL II MC 230 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  NATAL II MC 230 kV TR 230/69 kV NATAL II TR3 RN RBF FT TR 230/69 kV NATAL II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  NATAL II MC 230 kV TR 230/69 kV NATAL II TR2 RN RBF FT TR 230/69 kV NATAL II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  NATAL II MC 230 kV TR 230/69 kV NATAL II TR1 RN RBF FT TR 230/69 kV NATAL II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  NATAL II BC 69 kV 21,3 Mvar NATAL II BC4 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 160,144.34
  NATAL II IB 230 kV MG 230 kV NATAL II MG1 RN IB1 RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 166,420.18
  NATAL II RTL 230 kV 9,9 MVAr NATAL II RT3 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,594.99
  NATAL II RTL 230 kV 9,9 MVAr NATAL II RT2 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,594.99
  NATAL II MC 69 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 202,500.70
  NATAL II MC 230 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  NATAL II TT 69/13,8 kV NATAL II TA1 RN DIT   061/2001 IPCA RCDM REA 3578/2012 13/11/2015 12/11/2045 216,836.77
  NATAL II EL 230 kV NATAL II LT 230 kV PARAISO /NATAL II C-2 RN RB FT LT 230 kV PARAISO /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  NATAL II EL 230 kV NATAL II LT 230 kV PARAISO /NATAL II C-1 RN RB FT LT 230 kV PARAISO /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  NATAL II EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-2 RN RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  NATAL II EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC4 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC3 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC2 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  NATAL II MC 69 kV BC 69 kV 21,3 Mvar NATAL II BC1 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  NATAL II EL 69 kV NATAL II  NEOPOLIS-02J9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  NATAL II EL 69 kV NATAL II  IGAPO-02J5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  NATAL II RTL 230 kV 9,9 MVAr NATAL II RT3 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,725.90
  NATAL II RTL 230 kV 9,9 MVAr NATAL II RT2 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT2 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,725.90
  NATAL II TT 69/13,8 kV NATAL II TA2 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  NATAL II TR 69/3,3 kV NATAL II TR7 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 300,755.58
  NATAL II TR 69/3,3 kV NATAL II TR6 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 300,755.58
  NATAL II EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  NATAL II IB 230 kV MG 230 kV NATAL II MG1 RN IB1 RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 365,054.76
  NATAL II TR 230/69 kV NATAL II TR8 RN RBF FT TR 230/69 kV NATAL II TR8 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  NATAL II TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  NATAL II TR 230/69 kV NATAL II TR3 RN RBF FT TR 230/69 kV NATAL II TR3 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  NATAL II TR 230/69 kV NATAL II TR2 RN RBF FT TR 230/69 kV NATAL II TR2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  NATAL II TR 230/69 kV NATAL II TR1 RN RBF FT TR 230/69 kV NATAL II TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  NATAL II RTB 230 kV 30 MVAr NATAL II RT1 RN RB FT RTB 230 kV 30 MVAr NATAL II RT1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 376,410.89
  NATAL II MC 230 kV TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  NATAL II TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  NATAL II TR 230/69 kV NATAL II TR3 RN RBF FT TR 230/69 kV NATAL II TR3 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  NATAL II TR 230/69 kV NATAL II TR2 RN RBF FT TR 230/69 kV NATAL II TR2 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  NATAL II TR 230/69 kV NATAL II TR1 RN RBF FT TR 230/69 kV NATAL II TR1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  NATAL II RTL 230 kV 9,9 MVAr NATAL II RT3 RN RB FT RTL 230 kV 9,9 MVAr NATAL II RT3 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,501.17
  NATAL II CE 20/-0 Mvar NATAL II CE2 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 553,402.03
  NATAL II CE 20/-0 Mvar NATAL II CE1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 553,402.03
  NATAL II EL 230 kV NATAL II LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 719,564.55
  NATAL II CE 20/-0 Mvar NATAL II CE2 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 763,907.56
  NATAL II CE 20/-0 Mvar NATAL II CE1 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 763,907.56
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 993,275.70
  NATAL II TR 230/69 kV NATAL II TR4 RN RBF FT TR 230/69 kV NATAL II TR4 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  NATAL II TR 230/69 kV NATAL II TR3 RN RBF FT TR 230/69 kV NATAL II TR3 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  NATAL II CE 20/-0 Mvar NATAL II CE2 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,675,686.75
  NATAL II CE 20/-0 Mvar NATAL II CE1 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,675,686.75
  NATAL II MG 230 kV NATAL II MG1 RN RB FT MG 230 kV NATAL II MG1 RN 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,178,822.46
  NATAL III EL 230 kV NATAL III LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBNI REA 3208/2011 6/1/2020 6/1/2049 650.07
  NATAL III MG 230 kV NATAL III MG1 RN RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RMEL REN 643/2014 7/2/2014 6/2/2048 7,407.44
  NATAL III MG 230 kV NATAL III MG1 RN RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 29,494.82
  NATAL III MG 230 kV NATAL III MG1 RN RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RMEL REN 643/2014 28/02/2015 27/02/2030 63,416.33
  NATAL III TT 69/0 kV NATAL III TT1 RN DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 73,671.61
  NATAL III MG 230 kV NATAL III MG2 RN RB FT MG 230 kV NATAL III MG2 RN 061/2001 IPCA RBNI DSP 1073/2022 1/7/2022 30/06/2053 77,464.58
  NATAL III MC 69 kV TT 69/0 kV NATAL III TT1 RN DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 84,502.05
  NATAL III IB 69 kV MG 230 kV NATAL III MG1 RN IB1 DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 111,730.80
  NATAL III MG 230 kV NATAL III MG1 RN RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RBNI REA 2823/2011 21/03/2018 21/03/2052 139,324.63

 

105 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  NATAL III EL 69 kV NATAL III  DIST4 DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 168,277.09
  NATAL III EL 69 kV NATAL III  DIST3 DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 168,277.09
  NATAL III EL 69 kV NATAL III  DIST2 DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 168,277.09
  NATAL III EL 69 kV NATAL III  DIST1 DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 168,277.09
  NATAL III EL 230 kV NATAL III LT 230 kV NATAL III /NATAL II C-2 RN RB FT LT 230 kV NATAL III /NATAL II C-2 RN 061/2001 IPCA RBNI DSP 1073/2022 1/7/2022 30/06/2051 196,013.94
  NATAL III EL 230 kV NATAL III LT 230 kV NATAL III /NATAL II C-1 RN RB FT LT 230 kV NATAL III /NATAL II C-1 RN 061/2001 IPCA RBNI DSP 1073/2022 1/7/2022 30/06/2051 196,013.94
  NATAL III EL 230 kV NATAL III LT 230 kV EXTREMOZ II /NATAL III C-2 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-2 RN 061/2001 IPCA RBNI DSP 1073/2022 1/7/2022 30/06/2051 196,013.94
  NATAL III EL 230 kV NATAL III LT 230 kV EXTREMOZ II /NATAL III C-1 RN RB FT LT 230 kV EXTREMOZ II /NATAL III C-1 RN 061/2001 IPCA RBNI DSP 1073/2022 1/7/2022 30/06/2051 196,013.94
  NATAL III MC 69 kV TR 230/69 kV NATAL III TR2 RN RBF FT TR 230/69 kV NATAL III TR2 RN 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 208,841.17
  NATAL III MC 69 kV TR 230/69 kV NATAL III TR1 RN RBF FT TR 230/69 kV NATAL III TR1 RN 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 208,841.17
  NATAL III MC 69 kV TR 230/69 kV NATAL III TR3 RN RBF FT TR 230/69 kV NATAL III TR3 RN 017/2009 IPCA RBNI REA 2823/2011 21/03/2018 21/03/2052 337,278.70
  NATAL III IB 230 kV MG 230 kV NATAL III MG1 RN IB1 RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 469,243.65
  NATAL III MC 230 kV TR 230/69 kV NATAL III TR2 RN RBF FT TR 230/69 kV NATAL III TR2 RN 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 578,173.52
  NATAL III MC 230 kV TR 230/69 kV NATAL III TR1 RN RBF FT TR 230/69 kV NATAL III TR1 RN 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 578,173.52
  NATAL III MC 230 kV TR 230/69 kV NATAL III TR3 RN RBF FT TR 230/69 kV NATAL III TR3 RN 017/2009 IPCA RBNI REA 2823/2011 21/03/2018 21/03/2052 784,045.36
  NATAL III TR 230/69 kV NATAL III TR3 RN RBF FT TR 230/69 kV NATAL III TR3 RN 017/2009 IPCA RBNI REA 2823/2011 21/03/2018 21/03/2058 1,112,306.37
  NATAL III MG 230 kV NATAL III MG1 RN RB FT MG 230 kV NATAL III MG1 RN 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 1,412,287.70
  NATAL III TR 230/69 kV NATAL III TR2 RN RBF FT TR 230/69 kV NATAL III TR2 RN 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 2,184,129.59
  NATAL III TR 230/69 kV NATAL III TR1 RN RBF FT TR 230/69 kV NATAL III TR1 RN 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 2,184,129.59
  OLINDINA EL 13,8 kV OLINDINA  N.SOURE-01Y1 DIT   061/2001 IPCA RMEL REN 443/2011 12/1/2016 11/1/2046 4,828.34
  OLINDINA MC 69 kV RTN 69 kV 0 Mvar OLINDINA RTN2 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,755.22
  OLINDINA MC 69 kV RTN 69 kV 0 Mvar OLINDINA RTN1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,755.22
  OLINDINA RTN 69 kV 0 Mvar OLINDINA RTN2 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 14,361.37
  OLINDINA RTN 69 kV 0 Mvar OLINDINA RTN1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 14,361.37
  OLINDINA EL 500 kV OLINDINA LT 500 kV OLINDINA /CAMACARI II C-2 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-2 BA 061/2001 IPCA RMEL REN 643/2014 2/2/2014 1/2/2044 19,246.33
  OLINDINA MG 500 kV OLINDINA MG1 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RMEL REN 643/2014 11/7/2013 10/7/2030 25,113.63
  OLINDINA MG 500 kV OLINDINA MG1 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RMEL REN 643/2014 13/09/2013 12/9/2030 27,418.88
  OLINDINA MC 13,8 kV TR 13,8/0,46 kV OLINDINA TR3 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  OLINDINA MC 13,8 kV TR 13,8/0,46 kV OLINDINA TR2 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  OLINDINA EL 13,8 kV OLINDINA  N.SOURE-01Y1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  OLINDINA MC 230 kV TR 230/13,8 kV OLINDINA TR1 BA RBF FT TR 230/13,8 kV OLINDINA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 143,590.10
  OLINDINA EL 230 kV OLINDINA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-2 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS  /CATU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 213,548.01
  OLINDINA EL 230 kV OLINDINA LT 230 kV OLINDINA /RL (CIC. DANTAS / CATU) C-1 BA RB FT LT 230 kV OLINDINA /LT CIC. DANTAS  /CATU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 213,548.01
  OLINDINA TR 230/13,8 kV OLINDINA TR1 BA RBF FT TR 230/13,8 kV OLINDINA TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,729.78
  OLINDINA MC 500 kV RTL 500 kV 150 MVAr OLINDINA RT2 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  OLINDINA MC 500 kV RTL 500 kV 150 MVAr OLINDINA RT1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  OLINDINA RTL 500 kV 50 Mvar OLINDINA RTR1 BA RB FT RTL 500 kV 50 Mvar OLINDINA RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 268,494.05
  OLINDINA RTL 500 kV 50 Mvar OLINDINA RTR1 BA RB FT RTL 500 kV 50 Mvar OLINDINA RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 370,625.00
  OLINDINA IB 500 kV MG 500 kV OLINDINA MG1 BA IB3 RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  OLINDINA IB 500 kV MG 500 kV OLINDINA MG1 BA IB2 RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  OLINDINA IB 500 kV MG 500 kV OLINDINA MG1 BA IB1 RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  OLINDINA EL 500 kV OLINDINA LT 500 kV P. AFONSO IV /OLINDINA C-1 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  OLINDINA EL 500 kV OLINDINA LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  OLINDINA EL 500 kV OLINDINA LT 500 kV OLINDINA /CAMACARI II C-2 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  OLINDINA EL 500 kV OLINDINA LT 500 kV OLINDINA /CAMACARI II C-1 BA RB FT LT 500 kV OLINDINA /CAMACARI II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  OLINDINA IB 500 kV MG 500 kV OLINDINA MG1 BA IB1 RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  OLINDINA RTL 500 kV 150 MVAr OLINDINA RT2 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 805,482.14
  OLINDINA RTL 500 kV 150 MVAr OLINDINA RT1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 805,482.14
  OLINDINA RTL 500 kV 150 MVAr OLINDINA RT2 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,111,875.01
  OLINDINA RTL 500 kV 150 MVAr OLINDINA RT1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,111,875.01
  OLINDINA MG 500 kV OLINDINA MG1 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,400,102.08
  OLINDINA MG 500 kV OLINDINA MG1 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,932,679.13
  OLINDINA RTL 500 kV 150 MVAr OLINDINA RT1 BA RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,438,978.66
  OLINDINA MG 500 kV OLINDINA MG1 BA RB FT MG 500 kV OLINDINA MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,239,472.16
  OUROLANDIA II EL 230 kV OUROLANDIA II LT 230 kV OUROLANDIA II /IRECE C-1 BA RB FT LT 230 kV OUROLANDIA II /IRECE C-1 BA 061/2001 IPCA RBNI REA 9690/2021 4/6/2019 3/6/2047 147,475.09
  OUROLANDIA II EL 230 kV OUROLANDIA II LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA RB FT LT 230 kV CAMPO FORMOSO /OUROLANDIA II C-1 BA 061/2001 IPCA RBNI REA 9690/2021 4/6/2019 3/6/2047 147,475.09
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB2 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RMEL REN 643/2014 7/2/2013 6/2/2043 16,239.64
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB7 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RMEL REN 643/2014 15/02/2013 14/02/2043 16,250.44
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB5 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RMEL REN 643/2014 3/11/2013 2/11/2043 16,603.18
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBNI REA 5861/2016 6/9/2015 5/9/2043 26,620.02
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RCDM REA 5861/2016 6/9/2015 5/9/2043 26,620.02
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RCDM REA 5861/2016 6/9/2015 5/9/2043 26,620.02
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA DIT   061/2001 IPCA RCDM REA 5861/2016 6/9/2015 5/9/2043 26,620.02
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA DIT   061/2001 IPCA RCDM REA 5861/2016 6/9/2015 5/9/2043 26,620.02
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA DIT   061/2001 IPCA RCDM REA 5861/2016 6/9/2015 5/9/2043 26,620.02
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA DIT   061/2001 IPCA RCDM REA 5861/2016 6/9/2015 5/9/2043 26,620.02
  P. AFONSO IV MG 500 kV P. AFONSO IV MG1 BA RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RMEL REN 443/2011 20/10/2016 19/10/2033 31,708.89
  P. AFONSO IV MC 13,8 kV TR 18/13,8 kV P. AFONSO IV TR2 BA RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  P. AFONSO IV MC 13,8 kV TR 18/13,8 kV P. AFONSO IV TR1 BA RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR8 BA MC2 RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBNI REA 6137/2016 5/6/2019 5/6/2046 73,149.46
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR7 BA MC1 RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBNI REA 6137/2016 28/11/2019 28/11/2046 73,149.46
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR8 BA MC1 RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBNI REA 2040/2009 25/01/2016 24/01/2046 92,305.30
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR7 BA MC2 RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBNI REA 2040/2009 25/01/2016 24/01/2046 92,305.30
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR7 BA MC1 RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBNI REA 2040/2009 30/04/2015 29/04/2045 98,525.70
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBNI REA 5861/2016 6/9/2015 5/9/2030 100,412.34
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RCDM REA 5861/2016 6/9/2015 5/9/2030 100,412.34
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RCDM REA 5861/2016 6/9/2015 5/9/2030 100,412.34
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA DIT   061/2001 IPCA RCDM REA 5861/2016 6/9/2015 5/9/2030 100,412.34
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA DIT   061/2001 IPCA RCDM REA 5861/2016 6/9/2015 5/9/2030 100,412.34
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA DIT   061/2001 IPCA RCDM REA 5861/2016 6/9/2015 5/9/2030 100,412.34
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA DIT   061/2001 IPCA RCDM REA 5861/2016 6/9/2015 5/9/2030 100,412.34
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBNI REA 5861/2016 6/9/2015 5/9/2030 100,412.34
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR8 BA MC2 RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBNI REA 2040/2009 25/01/2016 24/01/2046 100,599.41
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR8 BA MC2 RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR8 BA MC1 RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR7 BA MC2 RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97

 

106 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  P. AFONSO IV MC 230 kV TR  500/230  kV P. AFONSO IV   TR7 BA MC1 RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  P. AFONSO IV MG 500 kV P. AFONSO IV MG1 BA RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBNI REA 6137/2016 27/05/2019 27/05/2051 197,062.09
  P. AFONSO IV MC 500 kV TR  500/230  kV P. AFONSO IV   TR8 BA RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  P. AFONSO IV MC 500 kV TR  500/230  kV P. AFONSO IV   TR7 BA RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB7 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB6 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB5 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB4 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB3 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB2 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-6 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-5 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-4 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /USINA PA-IV C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /OLINDINA C-1 BA RB FT LT 500 kV P. AFONSO IV /OLINDINA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /ANGELIM II C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  P. AFONSO IV MC 500 kV TR  500/230  kV P. AFONSO IV   TR8 BA RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBNI REA 6137/2016 27/05/2019 27/05/2041 518,138.44
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB3 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  P. AFONSO IV TR 500/230 kV P. AFONSO IV TRR1 BA RB FT TR 500/230 kV P. AFONSO IV TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 647,846.29
  P. AFONSO IV TR 500/230 kV P. AFONSO IV TRR1 BA RB FT TR 500/230 kV P. AFONSO IV TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 894,276.94
  P. AFONSO IV EL 500 kV P. AFONSO IV LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBNI REA 5745/2016 10/1/2020 10/1/2049 1,330,818.70
  P. AFONSO IV IB 500 kV MG 500 kV P. AFONSO IV MG1 BA IB1 RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBNI REA 5745/2016 13/03/2019 13/03/2050 1,367,022.20
  P. AFONSO IV TR  500/230  kV P. AFONSO IV   TR8 BA RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  P. AFONSO IV TR  500/230  kV P. AFONSO IV   TR7 BA RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  P. AFONSO IV MG 500 kV P. AFONSO IV MG1 BA RB FT MG 500 kV P. AFONSO IV MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,609,621.94
  P. AFONSO IV TR  500/230  kV P. AFONSO IV   TR8 BA RB FT TR  500/230  kV P. AFONSO IV   TR8 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,682,830.82
  P. AFONSO IV TR  500/230  kV P. AFONSO IV   TR7 BA RB FT TR  500/230  kV P. AFONSO IV   TR7 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,682,830.82
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /SANTANA II C-1 AL RB FT LT 230 kV P.AFONSO III /SANTANA II C-1 AL 061/2001 IPCA RMEL REN 443/2011 11/9/2015 10/9/2045 13,700.63
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE 061/2001 IPCA RMEL REN 443/2011 25/01/2013 24/01/2043 14,412.11
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE 061/2001 IPCA RMEL REN 443/2011 25/01/2013 24/01/2043 14,412.11
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE 061/2001 IPCA RMEL REN 443/2011 25/01/2013 24/01/2043 14,412.11
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RMEL REN 443/2011 13/03/2015 12/3/2045 15,345.04
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 1/4/2016 31/03/2046 15,807.31
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 1/4/2016 31/03/2046 15,807.31
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 1/4/2016 31/03/2046 15,807.31
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 14/04/2016 13/04/2046 15,822.91
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 14/04/2016 13/04/2046 15,822.91
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 14/04/2016 13/04/2046 15,822.91
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBNI REA 4347/2013 14/04/2015 13/04/2045 18,057.97
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBNI REA 4347/2013 14/04/2015 13/04/2045 18,057.97
  P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RMEL REN 643/2014 17/07/2013 16/07/2030 25,678.51
  P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RMEL REN 443/2011 20/09/2016 19/09/2033 32,279.00
  P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RMEL REN 643/2014 17/11/2015 16/11/2032 34,338.43
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBNI REA 4347/2013 16/03/2015 15/03/2045 36,034.18
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL DIT   061/2001 IPCA RMEL REN 643/2014 17/01/2015 16/01/2043 39,690.04
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RMEL REN 643/2014 22/02/2015 21/02/2043 39,809.61
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RMEL REN 643/2014 25/03/2015 24/03/2043 39,912.56
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RBNI REA 2837/2011 22/12/2014 21/12/2044 42,032.85
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 2837/2011 23/12/2014 22/12/2044 42,036.15
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 2837/2011 9/2/2015 8/2/2045 42,195.04
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RBNI REA 2376/2010 23/02/2015 22/02/2045 42,241.38
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2047 45,034.68
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RMEL REN 443/2011 6/9/2017 5/9/2047 45,371.30
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RMEL REN 443/2011 18/09/2017 17/09/2047 45,410.50
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RCDM REA 4347/2013 31/12/2019 30/12/2049 48,381.63
  P.AFONSO III EL 13,8 kV P.AFONSO III  AUXIL2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  P.AFONSO III EL 13,8 kV P.AFONSO III  AUXIL1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 9/6/2017 8/6/2047 67,620.67
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA DIT   061/2001 IPCA RMEL REN 443/2011 31/07/2017 30/07/2047 67,875.57
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-4 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 3/1/2020 3/1/2046 73,149.46
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 3/1/2020 3/1/2046 73,149.46
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 3/1/2020 3/1/2046 73,149.46
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-1 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 3/1/2020 3/1/2046 73,149.46
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 3/1/2020 3/1/2046 73,149.46
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA DIT   061/2001 IPCA RCDM REA 6137/2016 3/1/2020 3/1/2046 73,149.46
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RBNI REA 6137/2016 3/1/2020 3/1/2046 73,149.46
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBNI REA 6137/2016 25/11/2019 25/11/2046 73,149.46
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBNI REA 6137/2016 3/1/2020 3/1/2046 73,149.46
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RMEL REN 643/2014 29/09/2013 28/09/2041 74,088.82
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 7761/2019 2/5/2019 1/5/2049 143,890.44
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RCDM REA 4347/2013 22/09/2020 21/09/2053 160,078.18
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 6137/2016 28/11/2019 28/11/2051 200,007.84
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-4 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-3 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-2 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-III C-1 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86

 

107 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-4 AL/BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /SANTANA II C-1 AL RB FT LT 230 kV P.AFONSO III /SANTANA II C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-3 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-2 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /FLORESTA II C-1 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-2 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA RB FT LT 230 kV P.AFONSO III /CIC. DANTAS C-1 AL/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-2 BA/AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV U. A. SALES /P.AFONSO III C-1 BA/AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /USINA PA-II C-5 AL/BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE RB FT LT 230 kV P.AFONSO III /GARANHUNS II C-1 AL/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE RB FT LT 230 kV P.AFONSO III /BOM NOME C-3 AL/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 419,410.17
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL IB1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 419,410.17
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-2 AL/SE 061/2001 IPCA RBNI REA 2823/2011 3/7/2020 3/7/2050 556,260.89
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE RB FT LT 230 kV P.AFONSO III /ITABAIANA C-1 AL/SE 061/2001 IPCA RBNI REA 2823/2011 3/7/2020 3/7/2050 556,260.89
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ZEBU C-2 AL RB FT LT 230 kV P.AFONSO III /ZEBU C-2 AL/BA 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 620,204.54
  P.AFONSO III EL 230 kV P.AFONSO III LT 230 kV P.AFONSO III /ZEBU C-1 AL RB FT LT 230 kV P.AFONSO III /ZEBU C-1 AL 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 620,204.54
  P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 837,255.16
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL BARRA3 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 6137/2016 28/11/2019 28/11/2049 962,941.46
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL BARRA2 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 6137/2016 28/11/2019 28/11/2049 962,941.46
  P.AFONSO III IB 230 kV MG 230 kV P.AFONSO III MG1 AL BARRA1 RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBNI REA 6137/2016 28/11/2019 28/11/2049 962,941.46
  P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,155,734.00
  P.AFONSO III MG 230 kV P.AFONSO III MG1 AL RB FT MG 230 kV P.AFONSO III MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,535,186.53
  PARAISO MG 230 kV PARAISO MG1 RN RB FT MG 230 kV PARAISO MG1 RN 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2031 8,422.38
  PARAISO MG 230 kV PARAISO MG1 RN RB FT MG 230 kV PARAISO MG1 RN 061/2001 IPCA RMEL REN 643/2014 23/10/2015 22/10/2032 32,030.08
  PARAISO MG 230 kV PARAISO MG1 RN RB FT MG 230 kV PARAISO MG1 RN 061/2001 IPCA RMEL REN 443/2011 28/09/2016 27/09/2033 32,831.08
  PARAISO IB 138 kV MG 230 kV PARAISO MG1 RN IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,365.85
  PARAISO MC 138 kV TR 230/138 kV PARAISO TR1 RN RBF FT TR 230/138 kV PARAISO TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  PARAISO IB 230 kV MG 230 kV PARAISO MG1 RN IB1 RB FT MG 230 kV PARAISO MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  PARAISO MC 230 kV TR 230/138 kV PARAISO TR1 RN RBF FT TR 230/138 kV PARAISO TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  PARAISO EL 138 kV PARAISO LT 138 kV PILOES /PARAISO C-1 PB/RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  PARAISO EL 138 kV PARAISO LT 138 kV PARAISO /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  PARAISO EL 230 kV PARAISO LT 230 kV PARAISO /NATAL II C-2 RN RB FT LT 230 kV PARAISO /NATAL II C-2 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  PARAISO EL 230 kV PARAISO LT 230 kV PARAISO /NATAL II C-1 RN RB FT LT 230 kV PARAISO /NATAL II C-1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  PARAISO EL 230 kV PARAISO LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-2 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  PARAISO EL 230 kV PARAISO LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN RB FT LT 230 kV C.GRANDE II /PARAISO C-1 PB/RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  PARAISO EL 230 kV PARAISO LT 230 kV PARAISO /ACU II C-3 RN RB FT LT 230 kV PARAISO /ACU II C-3 RN 019/2010 IPCA RBL CC 019/2010 23/11/2010 23/11/2040 348,075.84
  PARAISO TR 230/138 kV PARAISO TR1 RN RBF FT TR 230/138 kV PARAISO TR1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,942.44
  PARAISO EL 230 kV PARAISO LT 230 kV PARAISO /ACU II C-2 RN RB FT LT 230 kV PARAISO /ACU II C-2 RN 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 488,228.47
  PARAISO MG 230 kV PARAISO MG1 RN RB FT MG 230 kV PARAISO MG1 RN 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 518,049.71
  PARAISO EL 230 kV PARAISO LT 230 kV PARAISO /LAGOA NOVA II C-1 RN RB FT LT 230 kV PARAISO /LAGOA NOVA II C-2 RN 010/2011 IPCA RBL CC 010/2011 13/10/2011 13/10/2041 542,678.32
  PARAISO MC 138 kV TR 230/138 kV PARAISO TR2 RN RBF FT TR 230/138 kV PARAISO TR2 RN 061/2001 IPCA RBNI REA 3402/2012 5/12/2014 4/12/2044 891,163.21
  PARAISO MC 230 kV TR 230/138 kV PARAISO TR2 RN RBF FT TR 230/138 kV PARAISO TR2 RN 061/2001 IPCA RBNI REA 3402/2012 5/12/2014 4/12/2044 1,152,561.43
  PARAISO TR 230/138 kV PARAISO TR2 RN RBF FT TR 230/138 kV PARAISO TR2 RN 061/2001 IPCA RBNI REA 3402/2012 5/12/2014 4/12/2048 1,438,807.30
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE 061/2001 IPCA RMEL REN 443/2011 2/5/2017 1/5/2047 1,699.04
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RMEL REN 443/2011 22/03/2017 21/03/2047 1,704.14
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RMEL REN 443/2011 8/3/2017 7/3/2047 1,707.74
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RMEL REN 443/2011 9/4/2017 8/4/2047 6,319.70
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR1 PE RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RMEL REN 443/2011 6/3/2017 5/3/2047 6,320.69
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2047 6,333.64
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RMEL REN 443/2011 6/3/2017 5/3/2047 6,337.41
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR1 PE RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2047 12,644.16
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR2 PE RBF FT TR 230/69 kV PAU FERRO TR2 PE 061/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2047 12,645.84
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR2 PE RBF FT TR 230/69 kV PAU FERRO TR2 PE 061/2001 IPCA RMEL REN 443/2011 12/2/2017 11/2/2047 12,674.64
  PAU FERRO MC 69 kV TR 230/69 kV PAU FERRO TR1 PE RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RMEL REN 643/2014 6/4/2014 5/4/2044 12,830.14
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REA 6108/2016 9/11/2018 9/11/2049 15,909.30
  PAU FERRO EL 69 kV PAU FERRO  PAU FERRO-02N6 DIT   061/2001 IPCA RCDM REA 2376/2010 19/09/2014 18/09/2044 25,748.12
  PAU FERRO MC 69 kV TT 69/0 kV PAU FERRO TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  PAU FERRO MC 69 kV TT 69/0 kV PAU FERRO TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 32,608.40
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RMEL REN 643/2014 27/11/2014 26/11/2042 41,857.38
  PAU FERRO IB 69 kV MG 230 kV PAU FERRO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REA 1814/2009 23/10/2013 22/10/2041 54,890.51
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REA 1814/2009 23/10/2013 22/10/2041 54,890.51
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REA 6108/2016 9/11/2018 9/11/2050 60,146.40
  PAU FERRO EL 69 kV PAU FERRO  PAU FERRO-02N5 DIT   061/2001 IPCA RCDM REA 2376/2010 19/09/2014 18/09/2044 61,280.55
  PAU FERRO MC 69 kV TR 230/69 kV PAU FERRO TR3 PE RBF FT TR 230/69 kV PAU FERRO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PAU FERRO MC 69 kV TR 230/69 kV PAU FERRO TR2 PE RBF FT TR 230/69 kV PAU FERRO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PAU FERRO MC 69 kV TR 230/69 kV PAU FERRO TR1 PE RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PAU FERRO RTL 500 kV 33,33 Mvar PAU FERRO RTR1 PE RB FT RTL 500 kV 33,33 Mvar PAU FERRO RTR1 PE 061/2001 IPCA RBNI REA 10140/2021 28/03/2016 28/03/2052 73,606.46
  PAU FERRO EL 69 kV PAU FERRO  PAU FERRO-02N6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PAU FERRO EL 69 kV PAU FERRO  PAU FERRO-02N5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RMEL REN 443/2011 29/12/2016 28/12/2044 77,064.93
  PAU FERRO MC 500 kV RTL 500 kV 100 Mvar PAU FERRO RT1 PE RB FT RTL 500 kV 100 Mvar PAU FERRO RT1 PE 061/2001 IPCA RBNI REA 10140/2021 28/03/2016 28/03/2042 79,542.80
  PAU FERRO TT 69/0 kV PAU FERRO TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REA 3677/2012 28/06/2019 28/06/2052 113,630.53
  PAU FERRO IB 230 kV MG 230 kV PAU FERRO MG1 PE IB1 RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR3 PE RBF FT TR 230/69 kV PAU FERRO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR2 PE RBF FT TR 230/69 kV PAU FERRO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR1 PE RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14

 

108 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

  PAU FERRO EL 500 kV PAU FERRO LT 500 kV PAU FERRO /RECIFE II C-1 PE RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 10140/2021 28/03/2016 28/03/2044 184,015.06
  PAU FERRO EL 500 kV PAU FERRO LT 500 kV ANGELIM II /PAU FERRO C-1 PE RB FT LT 500 kV ANGELIM II /PAU FERRO C-1 PE 061/2001 IPCA RBNI REA 10140/2021 28/03/2016 28/03/2044 184,015.06
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBNI REN 443/2011 8/11/2016 7/11/2044 197,285.77
  PAU FERRO RTL 500 kV 100 Mvar PAU FERRO RT1 PE RB FT RTL 500 kV 100 Mvar PAU FERRO RT1 PE 061/2001 IPCA RBNI REA 10140/2021 28/03/2016 28/03/2052 220,819.38
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV PAU FERRO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE RB FT LT 230 kV LAGOA DO CARRO /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  PAU FERRO MC 69 kV TR 230/69 kV PAU FERRO TR04 PE RBF FT TR 230/69 kV PAU FERRO TR04 PE 061/2001 IPCA RBNI REA 6108/2016 9/11/2018 9/11/2041 255,944.12
  PAU FERRO TT 69/0 kV PAU FERRO TA1 PE DIT   061/2001 IPCA RCDM REA 6108/2016 9/11/2018 9/11/2048 275,640.71
  PAU FERRO TR 230/69 kV PAU FERRO TR3 PE RBF FT TR 230/69 kV PAU FERRO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PAU FERRO TR 230/69 kV PAU FERRO TR2 PE RBF FT TR 230/69 kV PAU FERRO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PAU FERRO TR 230/69 kV PAU FERRO TR1 PE RBF FT TR 230/69 kV PAU FERRO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PAU FERRO EL 69 kV PAU FERRO  MONJOPE 02N4 DIT   061/2001 IPCA RCDM REA 1814/2009 23/10/2013 22/10/2043 448,969.37
  PAU FERRO EL 69 kV PAU FERRO  MONJOPE 02N3 DIT   061/2001 IPCA RCDM REA 1814/2009 23/10/2013 22/10/2043 448,969.37
  PAU FERRO MG 230 kV PAU FERRO MG1 PE RB FT MG 230 kV PAU FERRO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 588,959.75
  PAU FERRO MC 230 kV TR 230/69 kV PAU FERRO TR04 PE RBF FT TR 230/69 kV PAU FERRO TR04 PE 061/2001 IPCA RBNI REA 6108/2016 9/11/2018 9/11/2041 598,574.72
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB RB FT LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 3/8/2039 712,568.61
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE RB FT LT 230 kV PAU FERRO /MIRUEIRA II C-2 PE 061/2001 IPCA RBNI REA 3677/2012 20/05/2019 20/05/2044 717,942.08
  PAU FERRO EL 230 kV PAU FERRO LT 230 kV PAU FERRO /GOIANINHA C-1 PE RB FT LT 230 kV PAU FERRO /GOIANINHA C-1 PE 061/2001 IPCA RBNI REA 3677/2012 20/05/2019 20/05/2044 717,942.08
  PAU FERRO TR 230/69 kV PAU FERRO TR04 PE RBF FT TR 230/69 kV PAU FERRO TR04 PE 061/2001 IPCA RBNI REA 6108/2016 9/11/2018 9/11/2052 1,236,378.73
  PAU FERRO EL 230 kV PAU FERRO  FIAT 2 DIT   061/2001 IPCA RCDM REN 443/2011 8/11/2016 7/11/2046 1,389,193.76
  PAU FERRO EL 230 kV PAU FERRO  FIAT 1 DIT   061/2001 IPCA RCDM REN 443/2011 8/11/2016 7/11/2046 1,389,193.76
  PECEM II EL 500 kV PECEM II LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBNI REA 10140/2021 31/12/2015 31/12/2043 184,015.06
  PECEM II EL 500 kV PECEM II LT 500 kV PECEM II /FORTALEZA II C-1 CE RB FT LT 500 kV PECEM II /FORTALEZA II C-1 CE 061/2001 IPCA RBNI REA 10140/2021 31/12/2015 31/12/2043 184,015.06
  PECEM II IB 230 kV MG 500 kV PECEM II MG1 CE IB1 RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 449,152.14
  PECEM II MC 230 kV TR 500/230 kV PECEM II TR3 CE RB FT TR 500/230 kV PECEM II TR3 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 611,681.28
  PECEM II MC 230 kV TR 500/230 kV PECEM II TR2 CE RB FT TR 500/230 kV PECEM II TR2 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 611,681.28
  PECEM II MC 230 kV TR 500/230 kV PECEM II TR1 CE RB FT TR 500/230 kV PECEM II TR1 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 611,681.28
  PECEM II IB 500 kV MG 500 kV PECEM II MG1 CE IB4 RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 1,176,667.65
  PECEM II IB 500 kV MG 500 kV PECEM II MG1 CE IB3 RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 1,176,667.65
  PECEM II IB 500 kV MG 500 kV PECEM II MG1 CE IB2 RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 1,176,667.65
  PECEM II IB 500 kV MG 500 kV PECEM II MG1 CE IB1 RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 1,176,667.65
  PECEM II MC 500 kV TR 500/230 kV PECEM II TR3 CE RB FT TR 500/230 kV PECEM II TR3 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 1,182,264.16
  PECEM II MC 500 kV TR 500/230 kV PECEM II TR2 CE RB FT TR 500/230 kV PECEM II TR2 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 1,182,264.16
  PECEM II MC 500 kV TR 500/230 kV PECEM II TR1 CE RB FT TR 500/230 kV PECEM II TR1 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 1,182,264.16
  PECEM II TR 500/230 kV PECEM II TRR1 CE RB FT TR 500/230 kV PECEM II TRR1 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 1,952,905.35
  PECEM II MG 500 kV PECEM II MG1 CE RB FT MG 500 kV PECEM II MG1 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 2,164,261.13
  PECEM II TR 500/230 kV PECEM II TR3 CE RB FT TR 500/230 kV PECEM II TR3 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 5,858,719.13
  PECEM II TR 500/230 kV PECEM II TR2 CE RB FT TR 500/230 kV PECEM II TR2 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 5,858,719.13
  PECEM II TR 500/230 kV PECEM II TR1 CE RB FT TR 500/230 kV PECEM II TR1 CE 004/2010 IPCA RBL CC 004/2010 12/7/2010 11/7/2040 5,858,719.13
  PENEDO MC 230 kV TR 230/69 kV PENEDO TR2 AL RBF FT TR 230/69 kV PENEDO TR2 AL 061/2001 IPCA RMEL REN 443/2011 28/10/2016 27/10/2046 977.32
  PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RMEL REN 443/2011 28/10/2016 27/10/2046 2,091.87
  PENEDO EL 69 kV PENEDO  MARITUBA 02C5 DIT   061/2001 IPCA RCDM REA 5484/2015 9/3/2022 8/3/2052 4,501.53
  PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RMEL REN 643/2014 18/08/2015 17/08/2045 8,849.10
  PENEDO IB 230 kV MG 230 kV PENEDO MG1 AL IB1 RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RMEL REN 643/2014 18/08/2015 17/08/2045 9,166.56
  PENEDO IB 230 kV MG 230 kV PENEDO MG1 AL IB1 RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RMEL REN 443/2011 28/10/2016 27/10/2046 9,898.09
  PENEDO MC 230 kV TR 230/69 kV PENEDO TR2 AL RBF FT TR 230/69 kV PENEDO TR2 AL 061/2001 IPCA RMEL REN 643/2014 18/08/2015 17/08/2045 27,499.70
  PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RMEL REN 443/2011 2/2/2016 1/2/2033 31,385.40
  PENEDO IB 69 kV MG 230 kV PENEDO MG1 AL IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  PENEDO MC 230 kV BC 230 kV 15 Mvar PENEDO BC2 AL RB FT BC 230 kV 15 Mvar PENEDO BC2 AL 061/2001 IPCA RBNI REA 5861/2016 19/02/2018 18/02/2033 43,885.22
  PENEDO MC 230 kV BC 230 kV 15 Mvar PENEDO BC1 AL RB FT BC 230 kV 15 Mvar PENEDO BC1 AL 061/2001 IPCA RBNI REA 5861/2016 19/02/2018 18/02/2033 43,885.22
  PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RBNI REN 905/2020 30/04/2020 29/04/2051 47,114.73
  PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RMEL REN 643/2014 31/05/2015 30/05/2043 49,513.18
  PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RMEL REN 643/2014 10/11/2013 9/11/2041 55,436.78
  PENEDO IB 69 kV MG 230 kV PENEDO MG1 AL IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  PENEDO MC 69 kV TR 230/69 kV PENEDO TR2 AL RBF FT TR 230/69 kV PENEDO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PENEDO MC 69 kV TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PENEDO EL 69 kV PENEDO  PERIPERI 02C8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PENEDO EL 69 kV PENEDO  MARITUBA 02C5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PENEDO EL 69 kV PENEDO  MARITUBA 02C3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PENEDO EL 69 kV PENEDO  CARAPICHO 02C2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PENEDO EL 69 kV PENEDO  CARAPICHO 02C1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PENEDO EL 69 kV PENEDO  BOA CICA 02C4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PENEDO EL 69 kV PENEDO  ARAPIRACA 02C7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PENEDO EL 69 kV PENEDO  ARAPIRACA 02C6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PENEDO RTL 230 kV 10 Mvar PENEDO RT1 AL RB FT RTL 230 kV 10 Mvar PENEDO RT1 AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 85,364.63
  PENEDO MC 69 kV TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  PENEDO TT 69/13,8 kV PENEDO TA1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  PENEDO MC 69 kV TR 230/69 kV PENEDO TR3 AL RBF FT TR 230/69 kV PENEDO TR3 AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 92,931.18
  PENEDO EL 69 kV PENEDO  PERIPERI 02C8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PENEDO EL 69 kV PENEDO  MARITUBA 02C5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PENEDO EL 69 kV PENEDO  MARITUBA 02C3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PENEDO EL 69 kV PENEDO  CARAPICHO 02C1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PENEDO EL 69 kV PENEDO  BOA CICA 02C4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PENEDO EL 69 kV PENEDO  ARAPIRACA 02C7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PENEDO EL 69 kV PENEDO  ARAPIRACA 02C6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PENEDO IB 230 kV MG 230 kV PENEDO MG1 AL IB1 RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  PENEDO TT 69/13,8 kV PENEDO TA1 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  PENEDO IB 69 kV MG 230 kV PENEDO MG1 AL IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  PENEDO MC 230 kV TR 230/69 kV PENEDO TR2 AL RBF FT TR 230/69 kV PENEDO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PENEDO MC 230 kV TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PENEDO MC 69 kV TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  PENEDO MC 230 kV TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88

 

109 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  PENEDO EL 69 kV PENEDO  PERIPERI 02C8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PENEDO EL 69 kV PENEDO  MARITUBA 02C5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PENEDO EL 69 kV PENEDO  MARITUBA 02C3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PENEDO EL 69 kV PENEDO  CARAPICHO 02C1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PENEDO EL 69 kV PENEDO  BOA CICA 02C4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PENEDO EL 69 kV PENEDO  ARAPIRACA 02C7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PENEDO EL 69 kV PENEDO  ARAPIRACA 02C6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PENEDO TT 69/0 kV PENEDO TA2 AL DIT   061/2001 IPCA RCDM REA 2460/2010 2/9/2012 1/9/2042 276,927.32
  PENEDO TT 69/13,8 kV PENEDO TA1 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  PENEDO MC 69 kV TT 69/0 kV PENEDO TA2 AL DIT   061/2001 IPCA RCDM REA 2460/2010 2/9/2012 1/9/2043 298,186.99
  PENEDO MC 230 kV RTL 230 kV 10 Mvar PENEDO RT1 AL RB FT RTL 230 kV 10 Mvar PENEDO RT1 AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 301,789.04
  PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  PENEDO BC 230 kV 15 Mvar PENEDO BC1 AL RB FT BC 230 kV 15 Mvar PENEDO BC1 AL 061/2001 IPCA RBNI REA 2968/2011 23/11/2017 22/11/2041 354,330.36
  PENEDO BC 230 kV 15 Mvar PENEDO BC2 AL RB FT BC 230 kV 15 Mvar PENEDO BC2 AL 061/2001 IPCA RBNI REA 2968/2011 24/11/2017 23/11/2041 354,356.96
  PENEDO EL 230 kV PENEDO LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL RB FT LT 230 kV N.S.SOCORRO /PENEDO C-1 SE/AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 354,954.31
  PENEDO MC 230 kV TR 230/69 kV PENEDO TR3 AL RBF FT TR 230/69 kV PENEDO TR3 AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 360,084.00
  PENEDO TR 230/69 kV PENEDO TR2 AL RBF FT TR 230/69 kV PENEDO TR2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PENEDO TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PENEDO MC 230 kV TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 498,156.23
  PENEDO TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  PENEDO EL 69 kV PENEDO  PERIPERI 02J3 DIT   061/2001 IPCA RCDM REN 905/2020 30/04/2020 29/04/2048 561,449.75
  PENEDO TR 230/69 kV PENEDO TR3 AL RBF FT TR 230/69 kV PENEDO TR3 AL 005/2008 IPCA RBL CC 005/2008 17/03/2008 17/03/2038 637,710.63
  PENEDO EL 230 kV PENEDO LT 230 kV ARAPIRACA III /PENEDO C-1 AL RB FT LT 230 kV ARAPIRACA III /PENEDO C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 687,647.11
  PENEDO TR 230/69 kV PENEDO TR1 AL RBF FT TR 230/69 kV PENEDO TR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  PENEDO MC 230 kV BC 230 kV 15 Mvar PENEDO BC1 AL RB FT BC 230 kV 15 Mvar PENEDO BC1 AL 061/2001 IPCA RBNI REA 2968/2011 23/11/2017 22/11/2047 1,247,616.42
  PENEDO MC 230 kV BC 230 kV 15 Mvar PENEDO BC2 AL RB FT BC 230 kV 15 Mvar PENEDO BC2 AL 061/2001 IPCA RBNI REA 2968/2011 24/11/2017 23/11/2047 1,247,694.09
  PENEDO MG 230 kV PENEDO MG1 AL RB FT MG 230 kV PENEDO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,508,403.91
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBNI REA 8314/2019 10/8/2018 9/8/2033 12,044.93
  PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RMEL REN 443/2011 10/4/2016 9/4/2046 15,818.11
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBNI REA 6078/2016 21/05/2017 20/05/2045 19,952.51
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RMEL REN 643/2014 29/01/2014 28/01/2031 26,379.16
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RMEL REN 443/2011 13/01/2016 12/1/2033 31,308.04
  PICI II MC 69 kV TR 230/69 kV PICI II TR3 CE RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  PICI II MC 69 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  PICI II MC 69 kV TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PICI II MC 69 kV TR 230/69 kV PICI II TR3 CE RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 80,679.92
  PICI II MC 69 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 80,679.92
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBNI REA 6078/2016 21/10/2018 21/10/2049 83,312.19
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBNI REA 6078/2016 5/5/2021 5/5/2038 86,966.18
  PICI II IB 230 kV MG 230 kV PICI II MG1 CE IB1 RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  PICI II TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBNI REA 6078/2016 21/05/2017 20/05/2048 133,454.22
  PICI II MC 230 kV TR 230/69 kV PICI II TR3 CE RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PICI II MC 230 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PICI II MC 230 kV TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PICI II IB 230 kV MG 230 kV PICI II MG1 CE IB1 RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 166,420.18
  PICI II MC 69 kV TR 230/69 kV PICI II TR3 CE RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 176,977.27
  PICI II MC 69 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 176,977.27
  PICI II MC 230 kV TR 230/69 kV PICI II TR3 CE RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  PICI II MC 230 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  PICI II MC 69 kV TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBNI REA 6078/2016 21/05/2017 20/05/2047 237,348.86
  PICI II MC 230 kV TR 230/69 kV PICI II TR5 CE RBF FT TR 230/69 kV PICI II TR5 CE 061/2001 IPCA RBNI REA 6078/2016 21/10/2018 21/10/2041 275,396.40
  PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  PICI II TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBNI REA 6078/2016 5/5/2021 5/5/2023 359,082.50
  PICI II IB 230 kV MG 230 kV PICI II MG1 CE IB1 RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 365,054.76
  PICI II TR 230/69 kV PICI II TR3 CE RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PICI II TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PICI II TR 230/69 kV PICI II TR1 CE RBF FT TR 230/69 kV PICI II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PICI II MC 69 kV TR 230/69 kV PICI II TR4 CE RBF FT TR 230/69 kV PICI II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 17/02/2014 16/02/2044 421,088.90
  PICI II MC 230 kV TR 230/69 kV PICI II TR3 CE RBF FT TR 230/69 kV PICI II TR3 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  PICI II MC 230 kV TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 497,588.68
  PICI II TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  PICI II MC 230 kV TR 230/69 kV PICI II TR5 CE RBF FT TR 230/69 kV PICI II TR5 CE 061/2001 IPCA RBNI REA 6078/2016 21/10/2018 21/10/2041 644,170.68
  PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-2 CE RB FT LT 230 kV FORTALEZA II /PICI II C-2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  PICI II EL 230 kV PICI II LT 230 kV FORTALEZA II /PICI II C-1 CE RB FT LT 230 kV FORTALEZA II /PICI II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 686,863.68
  PICI II MC 230 kV TR 230/69 kV PICI II TR4 CE RBF FT TR 230/69 kV PICI II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 17/02/2014 16/02/2044 1,080,358.17
  PICI II TR 230/69 kV PICI II TR2 CE RBF FT TR 230/69 kV PICI II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  PICI II TR 230/69 kV PICI II TR5 CE RBF FT TR 230/69 kV PICI II TR5 CE 061/2001 IPCA RBNI REA 6078/2016 21/10/2018 21/10/2052 1,370,850.50
  PICI II TR 230/69 kV PICI II TR4 CE RBF FT TR 230/69 kV PICI II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 17/02/2014 16/02/2048 1,411,403.03
  PICI II MG 230 kV PICI II MG1 CE RB FT MG 230 kV PICI II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,506,685.40
  PICOS MC 69 kV TT 69/13,8 kV PICOS TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  PICOS EL 230 kV PICOS LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RMEL REN 443/2011 20/01/2016 19/01/2033 31,335.12
  PICOS IB 69 kV MG 230 kV PICOS MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  PICOS IB 69 kV MG 230 kV PICOS MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  PICOS MC 69 kV TR 230/69 kV PICOS TR3 PI RBF FT TR 230/69 kV PICOS TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PICOS MC 69 kV TR 230/69 kV PICOS TR2 PI RBF FT TR 230/69 kV PICOS TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PICOS MC 69 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBNI REA 5166/2015 9/2/2018 8/2/2050 70,822.23
  PICOS EL 69 kV PICOS  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25

 

110 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  PICOS EL 69 kV PICOS  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PICOS EL 69 kV PICOS  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PICOS EL 69 kV PICOS  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PICOS IB 230 kV MG 230 kV PICOS MG1 PI IB1 RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBNI REA 5166/2015 9/2/2018 8/2/2051 88,219.75
  PICOS MC 69 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  PICOS TT 69/13,8 kV PICOS TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  PICOS MC 230 kV RTL 230 kV 15 Mvar PICOS RT2 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  PICOS MC 69 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBNI REA 5166/2015 6/3/2018 5/3/2033 99,715.22
  PICOS EL 69 kV PICOS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PICOS EL 69 kV PICOS  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PICOS EL 69 kV PICOS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PICOS IB 230 kV MG 230 kV PICOS MG1 PI IB1 RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  PICOS TT 69/13,8 kV PICOS TA1 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  PICOS IB 69 kV MG 230 kV PICOS MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  PICOS MC 230 kV TR 230/69 kV PICOS TR3 PI RBF FT TR 230/69 kV PICOS TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PICOS MC 230 kV TR 230/69 kV PICOS TR2 PI RBF FT TR 230/69 kV PICOS TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PICOS MC 230 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PICOS TR 69/69 kV PICOS TREG1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 172,845.55
  PICOS MC 69 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  PICOS MC 230 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBNI REA 4602/2014 4/8/2017 3/8/2045 210,301.74
  PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBNI REA 4602/2014 4/8/2017 3/8/2045 210,301.74
  PICOS RTL 230 kV 15 Mvar PICOS RT2 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 214,677.46
  PICOS TR 230/69 kV PICOS TR2 PI RBF FT TR 230/69 kV PICOS TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 217,696.01
  PICOS EL 230 kV PICOS LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  PICOS EL 69 kV PICOS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PICOS RTB 230 kV 15 Mvar PICOS RT1 PI RB FT RTB 230 kV 15 Mvar PICOS RT1 PI 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 232,806.05
  PICOS TR 230/69 kV PICOS TR3 PI RBF FT TR 230/69 kV PICOS TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 257,282.21
  PICOS MC 230 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBNI REA 5166/2015 6/3/2018 5/3/2036 286,650.13
  PICOS TR 230/69 kV PICOS TR2 PI RBF FT TR 230/69 kV PICOS TR2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 300,504.19
  PICOS EL 230 kV PICOS LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  PICOS BC 230 kV 17 Mvar PICOS BC2 PI RB FT BC 230 kV 15 Mvar PICOS BC2 PI 061/2001 IPCA RBNI REA 4602/2014 4/8/2017 3/8/2041 351,377.95
  PICOS BC 230 kV 17 Mvar PICOS BC1 PI RB FT BC 230 kV 15 Mvar PICOS BC1 PI 061/2001 IPCA RBNI REA 4602/2014 4/8/2017 3/8/2041 351,377.95
  PICOS MC 230 kV RTB 230 kV 15 Mvar PICOS RT1 PI RB FT RTB 230 kV 15 Mvar PICOS RT1 PI 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 368,976.79
  PICOS MC 69 kV TR 230/69 kV PICOS TR4 PI RBF FT TR 230/69 kV PICOS TR4 PI 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042 375,895.74
  PICOS BC 230 kV 15 Mvar PICOS BC3 PI RB FT BC 230 kV 15 Mvar PICOS BC3 PI 061/2001 IPCA RBNI REA 5166/2015 9/2/2018 8/2/2038 419,390.12
  PICOS MC 230 kV TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  PICOS EL 230 kV PICOS LT 230 kV PICOS /TAUA II C-1 PI/CE RB FT LT 230 kV PICOS /TAUA II C-1 PI/CE 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 488,228.47
  PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 502,741.20
  PICOS TR 230/69 kV PICOS TR2 PI RBF FT TR 230/69 kV PICOS TR2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 659,177.78
  PICOS EL 230 kV PICOS LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 693,976.13
  PICOS MC 230 kV BC 230 kV 15 Mvar PICOS BC3 PI RB FT BC 230 kV 15 Mvar PICOS BC3 PI 061/2001 IPCA RBNI REA 5166/2015 9/2/2018 8/2/2042 767,401.23
  PICOS TR 230/69 kV PICOS TR4 PI RBF FT TR 230/69 kV PICOS TR4 PI 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2046 1,037,666.90
  PICOS MC 230 kV TR 230/69 kV PICOS TR4 PI RBF FT TR 230/69 kV PICOS TR4 PI 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2042 1,042,992.67
  PICOS MC 230 kV BC 230 kV 17 Mvar PICOS BC2 PI RB FT BC 230 kV 15 Mvar PICOS BC2 PI 061/2001 IPCA RBNI REA 4602/2014 4/8/2017 3/8/2047 1,238,995.57
  PICOS MC 230 kV BC 230 kV 17 Mvar PICOS BC1 PI RB FT BC 230 kV 15 Mvar PICOS BC1 PI 061/2001 IPCA RBNI REA 4602/2014 4/8/2017 3/8/2047 1,238,995.57
  PICOS TR 230/69 kV PICOS TR1 PI RBF FT TR 230/69 kV PICOS TR1 PI 061/2001 IPCA RBNI REA 5166/2015 6/3/2018 5/3/2053 1,345,766.77
  PICOS MG 230 kV PICOS MG1 PI RB FT MG 230 kV PICOS MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,522,287.09
  PILOES MG 138 kV PILOES MG1 PB DIT   061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 31,302.20
  PILOES IB 138 kV MG 138 kV PILOES MG1 PB IB1 DIT   061/2001 IPCA RCDM REA 1094/2007 9/11/2012 8/11/2043 701,535.59
  PILOES MC 138 kV MG 138 kV PILOES MG1 PB DIT   061/2001 IPCA RCDM REA 1094/2007 9/11/2012 8/11/2042 842,326.45
  PILOES EL 138 kV PILOES LT 138 kV PILOES /PARAISO C-1 PB/RN DIT   061/2001 IPCA RCDM REA 1094/2007 9/11/2012 8/11/2043 874,222.76
  PILOES EL 138 kV PILOES LT 138 kV C.GRANDE II /PILOES C-1 PB DIT   061/2001 IPCA RCDM REA 1094/2007 9/11/2012 8/11/2043 874,222.76
  PILOES MG 138 kV PILOES MG1 PB DIT   061/2001 IPCA RCDM REA 1094/2007 9/11/2012 8/11/2039 1,360,324.12
  PINDAI II MG 230 kV PINDAI II MG1 BA RB FT MG 230 kV PINDAI II MG1 BA 019/2012 IPCA RBNI REN 905/2020 12/1/2021 11/1/2049 37,909.28
  PINDAI II TT 69/0 kV PINDAI II TT1 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 1/6/2042 61,125.47
  PINDAI II MC 69 kV TT 69/0 kV PINDAI II TT1 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 1/6/2042 64,276.17
  PINDAI II IB 69 kV MG 69 kV PINDAI II MG1 BA IB1 ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 1/6/2042 103,518.08
  PINDAI II MC 69 kV TR 230/69 kV PINDAI II TR2 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 1/6/2042 151,831.87
  PINDAI II MC 69 kV TR 230/69 kV PINDAI II TR1 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 1/6/2042 151,831.87
  PINDAI II MG 69 kV PINDAI II MG1 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 1/6/2042 180,695.19
  PINDAI II IB 230 kV MG 230 kV PINDAI II MG1 BA IB1 RB FT MG 230 kV PINDAI II MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 352,219.62
  PINDAI II MC 230 kV TR 230/69 kV PINDAI II TR2 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 1/6/2042 381,033.64
  PINDAI II MC 230 kV TR 230/69 kV PINDAI II TR1 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 1/6/2042 381,033.64
  PINDAI II EL 69 kV PINDAI II  DIST1 DIT   019/2012 IPCA RCDM REN 905/2020 12/1/2021 11/1/2053 484,962.26
  PINDAI II EL 230 kV PINDAI II LT 230 kV IGAPORA III /PINDAI II C-1 BA RB FT LT 230 kV IGAPORA III /PINDAI II C-1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 569,845.64
  PINDAI II MG 230 kV PINDAI II MG1 BA RB FT MG 230 kV PINDAI II MG1 BA 019/2012 IPCA RBL CC 019/2012 16/11/2015 1/6/2042 959,962.26
  PINDAI II TR 230/69 kV PINDAI II TR2 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 1/6/2042 1,159,850.52
  PINDAI II TR 230/69 kV PINDAI II TR1 BA ICG   019/2012 IPCA RICG CC 019/2012 16/11/2015 1/6/2042 1,159,850.52
  PIRAPAMA II EL 69 kV PIRAPAMA II  SIMISA-02J1 DIT   061/2001 IPCA RMEL REN 443/2011 12/4/2016 11/4/2046 1,723.16
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RMEL REN 443/2011 12/4/2016 11/4/2046 1,879.37
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RMEL REN 443/2011 12/4/2016 11/4/2046 2,089.24
  PIRAPAMA II EL 69 kV PIRAPAMA II  PRAZERES-02V4 DIT   061/2001 IPCA RMEL REN 443/2011 12/4/2016 11/4/2046 2,297.54
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RMEL REN 443/2011 12/4/2016 11/4/2046 2,297.54
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RMEL REN 443/2011 12/4/2016 11/4/2046 2,297.54
  PIRAPAMA II EL 69 kV PIRAPAMA II  RHODIA-02J4 DIT   061/2001 IPCA RMEL REN 443/2011 12/4/2016 11/4/2046 2,505.84
  PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RMEL REN 443/2011 12/4/2016 11/4/2046 2,635.44
  PIRAPAMA II EL 69 kV PIRAPAMA II  W MARTINS-02J3 DIT   061/2001 IPCA RMEL REN 443/2011 12/4/2016 11/4/2046 2,635.44
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02J7 DIT   061/2001 IPCA RMEL REN 443/2011 12/4/2016 11/4/2046 2,635.44
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RMEL REN 443/2011 12/4/2016 11/4/2046 2,635.44
  PIRAPAMA II EL 69 kV PIRAPAMA II  JUCARAL-02J5 DIT   061/2001 IPCA RMEL REN 443/2011 12/4/2016 11/4/2046 2,635.44
  PIRAPAMA II EL 69 kV PIRAPAMA II  RHODIA-02J4 DIT   061/2001 IPCA RMEL REN 643/2014 14/09/2015 13/09/2045 2,752.83
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RMEL REN 643/2014 14/09/2015 13/09/2045 2,752.83
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RMEL REN 643/2014 15/09/2015 14/09/2045 2,753.03
  PIRAPAMA II EL 69 kV PIRAPAMA II  JUCARAL-02J5 DIT   061/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2045 2,753.45

 

111 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  PIRAPAMA II EL 69 kV PIRAPAMA II  PRAZERES-02V4 DIT   061/2001 IPCA RMEL REN 643/2014 22/09/2015 21/09/2045 2,754.52
  PIRAPAMA II EL 69 kV PIRAPAMA II  PRAZERES-02V4 DIT   061/2001 IPCA RMEL REN 643/2014 22/09/2015 21/09/2045 2,754.52
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RMEL REN 643/2014 3/8/2015 2/8/2045 2,758.71
  PIRAPAMA II EL 69 kV PIRAPAMA II  JUCARAL-02J5 DIT   061/2001 IPCA RMEL REN 643/2014 3/8/2015 2/8/2045 2,758.71
  PIRAPAMA II EL 69 kV PIRAPAMA II  W MARTINS-02J3 DIT   061/2001 IPCA RMEL REN 643/2014 12/8/2015 11/8/2045 2,760.63
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02J7 DIT   061/2001 IPCA RMEL REN 643/2014 12/8/2015 11/8/2045 2,760.63
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RMEL REN 643/2014 14/08/2015 13/08/2045 2,761.07
  PIRAPAMA II EL 69 kV PIRAPAMA II  JUCARAL-02J5 DIT   061/2001 IPCA RMEL REN 643/2014 14/08/2015 13/08/2045 2,761.07
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RMEL REN 643/2014 14/08/2015 13/08/2045 2,761.07
  PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RMEL REN 643/2014 29/07/2015 28/07/2045 2,763.72
  PIRAPAMA II EL 69 kV PIRAPAMA II  RECIFE-II-02V1 DIT   061/2001 IPCA RMEL REN 443/2011 12/4/2016 11/4/2046 4,588.83
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RMEL REN 443/2011 12/4/2016 11/4/2046 4,691.41
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RMEL REN 643/2014 16/09/2015 15/09/2045 5,506.48
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2045 5,506.92
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02J7 DIT   061/2001 IPCA RMEL REN 643/2014 18/09/2015 17/09/2045 5,507.35
  PIRAPAMA II EL 69 kV PIRAPAMA II  RECIFE-II-02V1 DIT   061/2001 IPCA RMEL REN 643/2014 22/09/2015 21/09/2045 5,509.04
  PIRAPAMA II EL 69 kV PIRAPAMA II  W MARTINS-02J3 DIT   061/2001 IPCA RMEL REN 643/2014 23/09/2015 22/09/2045 5,509.47
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RMEL REN 643/2014 24/09/2015 23/09/2045 5,509.89
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RMEL REN 643/2014 24/09/2015 23/09/2045 5,509.89
  PIRAPAMA II EL 69 kV PIRAPAMA II  AMBEV-02V2 DIT   061/2001 IPCA RMEL REN 643/2014 4/8/2015 3/8/2045 5,517.87
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02V3 DIT   061/2001 IPCA RMEL REN 643/2014 7/8/2015 6/8/2045 5,519.14
  PIRAPAMA II EL 69 kV PIRAPAMA II  PRAZERES-02V4 DIT   061/2001 IPCA RMEL REN 643/2014 10/8/2015 9/8/2045 5,520.43
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RMEL REN 643/2014 10/8/2015 9/8/2045 5,520.43
  PIRAPAMA II EL 69 kV PIRAPAMA II  AMBEV-02V2 DIT   061/2001 IPCA RMEL REN 643/2014 11/8/2015 10/8/2045 5,520.85
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02V3 DIT   061/2001 IPCA RMEL REN 643/2014 12/8/2015 11/8/2045 5,521.29
  PIRAPAMA II EL 69 kV PIRAPAMA II  RHODIA-02J4 DIT   061/2001 IPCA RMEL REN 643/2014 12/8/2015 11/8/2045 5,521.29
  PIRAPAMA II EL 69 kV PIRAPAMA II  RECIFE-II-02V1 DIT   061/2001 IPCA RMEL REN 643/2014 13/08/2015 12/8/2045 5,521.72
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RMEL REN 643/2014 13/08/2015 12/8/2045 5,521.72
  PIRAPAMA II EL 69 kV PIRAPAMA II  SIMISA-02J1 DIT   061/2001 IPCA RMEL REN 643/2014 30/07/2015 29/07/2045 5,527.87
  PIRAPAMA II EL 69 kV PIRAPAMA II  SIMISA-02J1 DIT   061/2001 IPCA RMEL REN 643/2014 31/07/2015 30/07/2045 5,528.29
  PIRAPAMA II EL 69 kV PIRAPAMA II  AMBEV-02V2 DIT   061/2001 IPCA RMEL REN 443/2011 12/4/2016 11/4/2046 6,255.23
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RMEL REN 443/2011 15/05/2015 14/05/2038 6,752.13
  PIRAPAMA II EL 69 kV PIRAPAMA II  RHODIA-02J4 DIT   061/2001 IPCA RMEL REN 443/2011 30/09/2015 29/09/2038 6,840.65
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RMEL REN 443/2011 5/5/2016 4/5/2046 15,848.12
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RMEL REN 443/2011 5/5/2016 4/5/2046 15,848.12
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RMEL REN 443/2011 5/5/2016 4/5/2046 15,848.12
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RCDM REA 1814/2009 5/4/2014 4/4/2045 18,609.25
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RCDM REA 1814/2009 29/03/2014 28/03/2044 19,177.94
  PIRAPAMA II BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RCDM REA 5861/2016 9/6/2016 8/6/2044 22,138.75
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RMEL REN 643/2014 29/03/2014 28/03/2044 24,026.09
  PIRAPAMA II MC 69 kV TT 69/13,8 kV PIRAPAMA II TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  PIRAPAMA II MC 69 kV TT 69/13,8 kV PIRAPAMA II TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  PIRAPAMA II TR 69/13,8 kV PIRAPAMA II TRX PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  PIRAPAMA II MG 230 kV PIRAPAMA II MG1 PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 32,197.76
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RMEL REN 643/2014 29/03/2014 28/03/2044 36,039.13
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RMEL REN 643/2014 5/8/2014 4/8/2044 36,405.96
  PIRAPAMA II IB 69 kV MG 230 kV PIRAPAMA II MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  PIRAPAMA II MG 230 kV PIRAPAMA II MG1 PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RMEL REN 643/2014 20/04/2015 19/04/2043 49,345.21
  PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RCDM REA 7761/2019 29/06/2018 28/06/2054 53,637.85
  PIRAPAMA II MC 69 kV TR 69/13,8 kV PIRAPAMA II TRX PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR4 PE RBF FT TR 230/69 kV PIRAPAMA II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  PIRAPAMA II EL 69 kV PIRAPAMA II  W MARTINS-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRAPAMA II EL 69 kV PIRAPAMA II  TERMOCABO-02P1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02V3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRAPAMA II EL 69 kV PIRAPAMA II  SIMISA-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRAPAMA II EL 69 kV PIRAPAMA II  RHODIA-02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRAPAMA II EL 69 kV PIRAPAMA II  RECIFE-II-02V1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRAPAMA II EL 69 kV PIRAPAMA II  PRAZERES-02V4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRAPAMA II EL 69 kV PIRAPAMA II  JUCARAL-02J5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRAPAMA II EL 69 kV PIRAPAMA II  AMBEV-02V2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRAPAMA II MC 69 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  PIRAPAMA II TT 69/13,8 kV PIRAPAMA II TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  PIRAPAMA II TT 69/13,8 kV PIRAPAMA II TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  PIRAPAMA II EL 69 kV PIRAPAMA II  W MARTINS-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PIRAPAMA II EL 69 kV PIRAPAMA II  TERMOCABO-02P1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PIRAPAMA II EL 69 kV PIRAPAMA II  SIMISA-02J1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PIRAPAMA II EL 69 kV PIRAPAMA II  RHODIA-02J4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PIRAPAMA II EL 69 kV PIRAPAMA II  PRAZERES-02V4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PIRAPAMA II EL 69 kV PIRAPAMA II  JUCARAL-02J5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PIRAPAMA II EL 69 kV PIRAPAMA II  AMBEV-02V2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PIRAPAMA II BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,338.74
  PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RMEL REN 443/2011 18/11/2017 17/11/2049 120,363.30
  PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RMEL REN 443/2011 8/12/2017 7/12/2049 120,525.07

 

112 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  PIRAPAMA II IB 230 kV MG 230 kV PIRAPAMA II MG1 PE IB1 RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  PIRAPAMA II TT 69/13,8 kV PIRAPAMA II TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR4 PE RBF FT TR 230/69 kV PIRAPAMA II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PIRAPAMA II IB 230 kV MG 230 kV PIRAPAMA II MG1 PE IB1 RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 166,420.18
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE RB FT LT 230 kV JABOATAO II /PIRAPAMA II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  PIRAPAMA II EL 230 kV PIRAPAMA II  LANXES DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  PIRAPAMA II MC 69 kV BC 69 kV 20,3 Mvar PIRAPAMA II BC1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  PIRAPAMA II EL 69 kV PIRAPAMA II  W MARTINS-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PIRAPAMA II EL 69 kV PIRAPAMA II  TERMOCABO-02P1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PIRAPAMA II EL 69 kV PIRAPAMA II  SUAPE-02J7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PIRAPAMA II EL 69 kV PIRAPAMA II  SIMISA-02J1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PIRAPAMA II EL 69 kV PIRAPAMA II  RHODIA-02J4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PIRAPAMA II EL 69 kV PIRAPAMA II  PRAZERES-02V4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PIRAPAMA II EL 69 kV PIRAPAMA II  PONTEZINHA-02J9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PIRAPAMA II EL 69 kV PIRAPAMA II  PIEDADE-02J8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PIRAPAMA II EL 69 kV PIRAPAMA II  JUCARAL-02J5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PIRAPAMA II EL 69 kV PIRAPAMA II  CABO-02J6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PIRAPAMA II EL 69 kV PIRAPAMA II  AMBEV-02V2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PIRAPAMA II TT 69/13,8 kV PIRAPAMA II TA2 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  PIRAPAMA II TR 230/69 kV PIRAPAMA II TR4 PE RBF FT TR 230/69 kV PIRAPAMA II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PIRAPAMA II TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PIRAPAMA II TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PIRAPAMA II TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV PIRAPAMA II /SUAPE II C-2 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 382,418.02
  PIRAPAMA II EL 230 kV PIRAPAMA II LT 230 kV PIRAPAMA II /SUAPE II C-1 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 382,418.02
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  PIRAPAMA II MC 230 kV TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  PIRAPAMA II TR 230/69 kV PIRAPAMA II TR3 PE RBF FT TR 230/69 kV PIRAPAMA II TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  PIRAPAMA II TR 230/69 kV PIRAPAMA II TR2 PE RBF FT TR 230/69 kV PIRAPAMA II TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  PIRAPAMA II TR 230/69 kV PIRAPAMA II TR1 PE RBF FT TR 230/69 kV PIRAPAMA II TR1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  PIRAPAMA II MG 230 kV PIRAPAMA II MG1 PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 613,871.02
  PIRAPAMA II MG 230 kV PIRAPAMA II MG1 PE RB FT MG 230 kV PIRAPAMA II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 847,378.00
  PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI 061/2001 IPCA RMEL REN 443/2011 19/05/2016 18/05/2046 6,698.70
  PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI 061/2001 IPCA RMEL REN 443/2011 19/05/2016 18/05/2046 6,698.70
  PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI 061/2001 IPCA RMEL REN 443/2011 19/05/2016 18/05/2046 6,698.70
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR2 PI RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RMEL REN 443/2011 1/9/2015 31/08/2038 7,163.49
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR2 PI RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RMEL REN 443/2011 1/9/2015 31/08/2038 7,163.49
  PIRIPIRI MC 69 kV TT 69/0 kV PIRIPIRI TA2 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  PIRIPIRI MC 69 kV TT 69/0 kV PIRIPIRI TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  PIRIPIRI TR 69/13,8 kV PIRIPIRI TR6C PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  PIRIPIRI TR 69/13,8 kV PIRIPIRI TR6B PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RMEL REN 443/2011 26/01/2016 25/01/2033 31,358.33
  PIRIPIRI BC 230 kV 30 Mvar PIRIPIRI BC1 PI RB FT BC 230 kV 30 Mvar PIRIPIRI BC1 PI 061/2001 IPCA RBNI REA 5861/2016 3/5/2017 2/5/2045 37,894.12
  PIRIPIRI EL 138 kV PIRIPIRI  TABULEIRO-03C1 DIT   061/2001 IPCA RCDM REA 7761/2019 31/12/2019 30/12/2034 43,189.19
  PIRIPIRI IB 69 kV MG 230 kV PIRIPIRI MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI 061/2001 IPCA RMEL REN 643/2014 5/5/2014 4/5/2028 46,227.85
  PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI 061/2001 IPCA RMEL REN 643/2014 6/5/2014 5/5/2028 46,234.76
  PIRIPIRI BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI 061/2001 IPCA RMEL REN 643/2014 7/5/2014 6/5/2028 46,241.64
  PIRIPIRI EL 13,8 kV PIRIPIRI  SETE CIDAD-01Y3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  PIRIPIRI EL 13,8 kV PIRIPIRI  PIRIPIRI-01Y2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  PIRIPIRI EL 13,8 kV PIRIPIRI  PIRACURUCA-01Y1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  PIRIPIRI RTL 230 kV 3,33 Mvar PIRIPIRI RTR1 PI RB FT RTL 230 kV 3,33 Mvar PIRIPIRI RTR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,763.78
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RMEL REN 643/2014 8/10/2014 7/10/2044 56,897.72
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBNI REA 1814/2009 29/05/2015 28/05/2043 57,301.75
  PIRIPIRI MC 13,8 kV RTB 13,8 kV 5 Mvar PIRIPIRI RT1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  PIRIPIRI MC 69 kV TR 69/13,8 kV PIRIPIRI TR6A PI TR6A/TR6C DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR3 PI RBF FT TR 230/69 kV PIRIPIRI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR2 PI RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PIRIPIRI EL 13,8 kV PIRIPIRI  SETE CIDAD-01Y3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 71,769.69
  PIRIPIRI EL 13,8 kV PIRIPIRI  PIRIPIRI-01Y2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 71,769.69
  PIRIPIRI EL 13,8 kV PIRIPIRI  PIRACURUCA-01Y1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 71,769.69
  PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  PIRIPIRI MC 13,8 kV BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI RBF FT BC 13,8 kV 3,6 MVAr PIRIPIRI BC1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  PIRIPIRI EL 69 kV PIRIPIRI  PIRACURUCA-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRIPIRI EL 69 kV PIRIPIRI  PEDRO II-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRIPIRI EL 69 kV PIRIPIRI  ESPERANTIN-02J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRIPIRI EL 69 kV PIRIPIRI  C.MAIOR-02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RMEL REN 643/2014 30/10/2013 29/10/2041 79,575.29
  PIRIPIRI MC 13,8 kV RTB 13,8 kV 5 Mvar PIRIPIRI RT1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 89,933.61
  PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  PIRIPIRI IB 138 kV MG 230 kV PIRIPIRI MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,365.85
  PIRIPIRI TT 69/0 kV PIRIPIRI TA2 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  PIRIPIRI TT 69/0 kV PIRIPIRI TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  PIRIPIRI MC 230 kV RTL 230 kV 10 MVAr PIRIPIRI RT1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  PIRIPIRI EL 69 kV PIRIPIRI  PIRACURUCA-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82

 

113 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  PIRIPIRI EL 69 kV PIRIPIRI  PEDRO II-02J1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PIRIPIRI EL 69 kV PIRIPIRI  ESPERANTIN-02J2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR3 PI RBF FT TR 230/69 kV PIRIPIRI TR3 PI 061/2001 IPCA RMEL REN 443/2011 16/03/2016 15/03/2049 113,848.66
  PIRIPIRI MC 138 kV TR 230/138 kV PIRIPIRI TR5 PI RBF FT TR 230/138 kV PIRIPIRI TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  PIRIPIRI MC 138 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBNI REA 2040/2009 26/08/2013 25/08/2041 121,454.51
  PIRIPIRI RTS 13,8 kV 0 Mvar PIRIPIRI RTS1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  PIRIPIRI RTB 13,8 kV 5 Mvar PIRIPIRI RT1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR3 PI RBF FT TR 230/69 kV PIRIPIRI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR2 PI RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PIRIPIRI MC 230 kV TR 230/138 kV PIRIPIRI TR5 PI RBF FT TR 230/138 kV PIRIPIRI TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PIRIPIRI MC 230 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  PIRIPIRI EL 13,8 kV PIRIPIRI  SETE CIDAD-01Y3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 157,432.03
  PIRIPIRI EL 13,8 kV PIRIPIRI  PIRIPIRI-01Y2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 157,432.03
  PIRIPIRI EL 13,8 kV PIRIPIRI  PIRACURUCA-01Y1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 157,432.03
  PIRIPIRI MC 138 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 161,455.34
  PIRIPIRI RTL 230 kV 10 MVAr PIRIPIRI RT1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  PIRIPIRI EL 138 kV PIRIPIRI  TABULEIRO-03C1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBNI REA 2823/2011 17/11/2014 16/11/2042 196,436.28
  PIRIPIRI MC 13,8 kV RTB 13,8 kV 5 Mvar PIRIPIRI RT1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,275.92
  PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBNI REA 2823/2011 29/04/2016 28/04/2044 203,837.72
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  PIRIPIRI MC 230 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR2 PI RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RBNI REA 2823/2011 24/09/2015 23/09/2043 217,227.03
  PIRIPIRI EL 230 kV PIRIPIRI LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  PIRIPIRI EL 230 kV PIRIPIRI LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE RB FT LT 230 kV PIRIPIRI /IBIAPINA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  PIRIPIRI TR 69/13,8 kV PIRIPIRI TR6A PI DIT   061/2001 IPCA RCDM REA 6233/2017 12/7/2019 12/7/2048 222,127.42
  PIRIPIRI EL 69 kV PIRIPIRI  PIRACURUCA-02J3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PIRIPIRI EL 69 kV PIRIPIRI  PEDRO II-02J1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PIRIPIRI EL 138 kV PIRIPIRI  TABULEIRO-03C1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 240,745.16
  PIRIPIRI TR 230/69 kV PIRIPIRI TR3 PI RBF FT TR 230/69 kV PIRIPIRI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 257,282.21
  PIRIPIRI TR 230/138 kV PIRIPIRI TR5 PI RBF FT TR 230/138 kV PIRIPIRI TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,678.64
  PIRIPIRI TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,678.64
  PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR2 PI RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RBNI REA 2823/2011 24/09/2015 23/09/2045 299,637.71
  PIRIPIRI MC 69 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBNI REA 2823/2011 1/12/2015 30/11/2045 300,986.79
  PIRIPIRI EL 230 kV PIRIPIRI LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  PIRIPIRI IB 230 kV MG 230 kV PIRIPIRI MG1 PI IB1 RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBNI REA 2823/2011 13/03/2015 12/3/2046 323,691.17
  PIRIPIRI MC 138 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 354,164.03
  PIRIPIRI BC 230 kV 30 Mvar PIRIPIRI BC1 PI RB FT BC 230 kV 30 Mvar PIRIPIRI BC1 PI 061/2001 IPCA RBNI REA 2823/2011 29/04/2016 28/04/2040 373,173.27
  PIRIPIRI BC 230 kV 30 Mvar PIRIPIRI BC2 PI RB FT BC 230 kV 30 Mvar PIRIPIRI BC2 PI 061/2001 IPCA RBNI REA 3208/2011 4/12/2017 3/12/2041 390,585.01
  PIRIPIRI TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 394,346.36
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  PIRIPIRI MC 230 kV TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  PIRIPIRI EL 69 kV PIRIPIRI  ESPERANTIN-02J5 DIT   061/2001 IPCA RCDM REA 1814/2009 29/05/2015 28/05/2045 466,935.03
  PIRIPIRI EL 138 kV PIRIPIRI  TABULEIRO-03C1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 528,092.00
  PIRIPIRI EL 230 kV PIRIPIRI LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 685,270.09
  PIRIPIRI MC 230 kV TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBNI REA 2823/2011 1/12/2015 30/11/2045 763,896.74
  PIRIPIRI TR 230/138 kV PIRIPIRI TR4 PI RBF FT TR 230/138 kV PIRIPIRI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 865,027.40
  PIRIPIRI EL 138 kV PIRIPIRI  TABULEIRO 03C2 DIT   061/2001 IPCA RCDM REA 2040/2009 26/08/2013 25/08/2043 906,205.12
  PIRIPIRI MC 138 kV TR 230/138 kV PIRIPIRI TR7 PI RBF FT TR 230/138 kV PIRIPIRI TR7 PI 061/2001 IPCA RBNI REA 2823/2011 17/11/2014 16/11/2044 927,028.86
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 945,936.18
  PIRIPIRI MC 230 kV BC 230 kV 30 Mvar PIRIPIRI BC1 PI RB FT BC 230 kV 30 Mvar PIRIPIRI BC1 PI 061/2001 IPCA RBNI REA 2823/2011 29/04/2016 28/04/2047 1,105,830.04
  PIRIPIRI TR 230/138 kV PIRIPIRI TR7 PI RBF FT TR 230/138 kV PIRIPIRI TR7 PI 061/2001 IPCA RBNI REA 2823/2011 17/11/2014 16/11/2048 1,137,567.87
  PIRIPIRI MC 230 kV TR 230/138 kV PIRIPIRI TR7 PI RBF FT TR 230/138 kV PIRIPIRI TR7 PI 061/2001 IPCA RBNI REA 2823/2011 17/11/2014 16/11/2044 1,161,804.18
  PIRIPIRI MC 230 kV BC 230 kV 30 Mvar PIRIPIRI BC2 PI RB FT BC 230 kV 30 Mvar PIRIPIRI BC2 PI 061/2001 IPCA RBNI REA 3208/2011 4/12/2017 3/12/2047 1,247,297.09
  PIRIPIRI TR 230/69 kV PIRIPIRI TR2 PI RBF FT TR 230/69 kV PIRIPIRI TR2 PI 061/2001 IPCA RBNI REA 2823/2011 24/09/2015 23/09/2049 1,263,882.97
  PIRIPIRI TR 230/69 kV PIRIPIRI TR1 PI RBF FT TR 230/69 kV PIRIPIRI TR1 PI 061/2001 IPCA RBNI REA 2823/2011 1/12/2015 30/11/2049 1,268,995.56
  PIRIPIRI MG 230 kV PIRIPIRI MG1 PI RB FT MG 230 kV PIRIPIRI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,074,979.76
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 443/2011 12/6/2016 11/6/2046 8,411.22
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 443/2011 12/6/2016 11/6/2046 8,411.22
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 443/2011 12/6/2016 11/6/2046 8,411.22
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J9 DIT   061/2001 IPCA RCDM REA 2376/2010 5/4/2014 4/4/2044 8,531.92
  PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /NARANDIBA C-2 BA RB FT LT 230 kV PITUACU /NARANDIBA C-2 BA 061/2001 IPCA RMEL REN 443/2011 17/10/2015 16/10/2045 14,502.72
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RMEL REN 443/2011 3/4/2016 2/4/2046 15,809.71
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RMEL REN 443/2011 3/4/2016 2/4/2046 15,809.71
  PITUACU EL 69 kV PITUACU  CAJAZ 02J3 DIT   061/2001 IPCA RCDM REA 2837/2011 29/11/2017 28/11/2047 21,762.93
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 643/2014 27/08/2013 26/08/2030 25,825.07
  PITUACU MC 69 kV TT 69/13,8 kV PITUACU TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  PITUACU TR 69/13,8 kV PITUACU TR1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  PITUACU EL 69 kV PITUACU  PITUACU 02V1 DIT   061/2001 IPCA RCDM REA 2376/2010 12/4/2014 11/4/2045 30,531.76
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 443/2011 30/08/2016 29/08/2033 32,197.76
  PITUACU EL 69 kV PITUACU  PITUBA 02J6 DIT   061/2001 IPCA RCDM REA 2837/2011 2/8/2015 1/8/2045 34,398.76
  PITUACU EL 69 kV PITUACU  LFREIT/COTEGIPE DIT   061/2001 IPCA RCDM REA 2837/2011 23/10/2016 22/10/2046 35,569.36
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J9 DIT   061/2001 IPCA RCDM REA 2837/2011 12/10/2016 11/10/2046 35,626.59
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J8 DIT   061/2001 IPCA RCDM REA 2837/2011 8/2/2017 7/2/2047 35,851.56
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J8 DIT   061/2001 IPCA RCDM REA 2837/2011 8/2/2017 7/2/2047 35,884.62
  PITUACU EL 69 kV PITUACU  PITUACU 02V1 DIT   061/2001 IPCA RCDM REA 2837/2011 20/03/2017 19/03/2047 35,956.09
  PITUACU EL 69 kV PITUACU  PITUACU 02V1 DIT   061/2001 IPCA RCDM REA 2837/2011 19/03/2017 18/03/2047 35,969.18
  PITUACU EL 69 kV PITUACU  PITUBA 02J7 DIT   061/2001 IPCA RCDM REA 2837/2011 29/11/2017 28/11/2047 36,619.77
  PITUACU EL 69 kV PITUACU  CAJAZ 02J3 DIT   061/2001 IPCA RCDM REA 2837/2011 29/11/2017 28/11/2047 36,619.77
  PITUACU TR 69/13,8 kV PITUACU TR1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /RL (COTEGIPE / MATATU) C-1 BA/PE RB FT LT 230 kV PITUACU /RL (COTEGIPE/MATATU) C-1 BA/PE 061/2001 IPCA RBNI REA 5861/2016 12/1/2018 11/1/2033 41,245.92
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI II /PITUACU C-1 BA RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2040/2009 9/6/2014 8/6/2044 43,162.21

 

114 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  PITUACU IB 69 kV MG 230 kV PITUACU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI II /PITUACU C-1 BA RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2040/2009 30/11/2017 29/11/2047 45,336.56
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RMEL REN 643/2014 30/04/2015 29/04/2043 49,386.17
  PITUACU IB 69 kV MG 230 kV PITUACU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RMEL REN 643/2014 19/01/2014 18/01/2044 61,556.77
  PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /RL (COTEGIPE / MATATU) C-1 BA/PE RB FT LT 230 kV PITUACU /RL (COTEGIPE/MATATU) C-1 BA/PE 061/2001 IPCA RMEL REN 643/2014 2/2/2014 1/2/2044 61,625.41
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044 61,728.34
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  PITUACU MC 69 kV BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PITUACU EL 69 kV PITUACU  PITUBA 02J7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PITUACU EL 69 kV PITUACU  PITUBA 02J6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PITUACU EL 69 kV PITUACU  PITUACU 02V1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PITUACU EL 69 kV PITUACU  MATATU 02J5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PITUACU EL 69 kV PITUACU  LFREIT/COTEGIPE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PITUACU EL 69 kV PITUACU  CAJAZ 02J4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PITUACU EL 69 kV PITUACU  CAJAZ 02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PITUACU EL 69 kV PITUACU  CAB 02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  PITUACU TR 69/13,8 kV PITUACU TR1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2891/2011 5/5/2014 4/5/2040 87,312.93
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  PITUACU TT 69/13,8 kV PITUACU TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  PITUACU MC 69 kV BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PITUACU EL 69 kV PITUACU  PITUBA 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PITUACU EL 69 kV PITUACU  PITUBA 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PITUACU EL 69 kV PITUACU  PITUACU 02V1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PITUACU EL 69 kV PITUACU  MATATU 02J5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PITUACU EL 69 kV PITUACU  LFREIT/COTEGIPE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PITUACU EL 69 kV PITUACU  CAJAZ 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PITUACU EL 69 kV PITUACU  CAJAZ 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PITUACU EL 69 kV PITUACU  CAB 02J1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  PITUACU BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 115,654.60
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI II /PITUACU C-1 BA RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBNI REA 5861/2016 12/1/2018 11/1/2033 118,168.41
  PITUACU TT 69/13,8 kV PITUACU TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  PITUACU IB 69 kV MG 230 kV PITUACU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  PITUACU IB 230 kV MG 230 kV PITUACU MG1 BA IB1 RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  PITUACU BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 159,647.81
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  PITUACU MC 69 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBNI REA 2040/2009 16/05/2014 15/05/2045 220,782.73
  PITUACU MC 69 kV BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PITUACU EL 69 kV PITUACU  S.CRIST. 02J8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PITUACU EL 69 kV PITUACU  PITUBA 02J7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PITUACU EL 69 kV PITUACU  PITUBA 02J6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PITUACU EL 69 kV PITUACU  PITUACU 02V1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PITUACU EL 69 kV PITUACU  MATATU 02J5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PITUACU EL 69 kV PITUACU  LFREIT/COTEGIPE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PITUACU EL 69 kV PITUACU  CAJAZ 02J4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PITUACU EL 69 kV PITUACU  CAJAZ 02J3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /RL (COTEGIPE / MATATU) C-1 BA/PE RB FT LT 230 kV PITUACU /RL (COTEGIPE/MATATU) C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /NARANDIBA C-2 BA RB FT LT 230 kV PITUACU /NARANDIBA C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  PITUACU EL 230 kV PITUACU LT 230 kV PITUACU /NARANDIBA C-1 BA RB FT LT 230 kV PITUACU /NARANDIBA C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI IV /PITUACU C-1 BA RB FT LT 230 kV CAMACARI IV /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  PITUACU EL 230 kV PITUACU LT 230 kV CAMACARI II /PITUACU C-1 BA RB FT LT 230 kV CAMACARI II /PITUACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  PITUACU TT 69/13,8 kV PITUACU TA2 BA DIT   061/2001 IPCA RCDM REA 2412/2010 12/8/2012 11/8/2042 276,507.01
  PITUACU MC 69 kV TT 69/13,8 kV PITUACU TA2 BA DIT   061/2001 IPCA RCDM REA 2412/2010 12/8/2012 11/8/2043 297,751.21
  PITUACU BC 69 kV 21,2 Mvar PITUACU BC1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 350,199.07
  PITUACU TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PITUACU TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PITUACU TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PITUACU TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  PITUACU TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  PITUACU TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  PITUACU TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  PITUACU TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  PITUACU MC 230 kV TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 623,324.74
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036 654,424.32
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 860,427.77
  PITUACU TR 230/69 kV PITUACU TR4 BA RBF FT TR 230/69 kV PITUACU TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84

 

115 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  PITUACU TR 230/69 kV PITUACU TR3 BA RBF FT TR 230/69 kV PITUACU TR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  PITUACU TR 230/69 kV PITUACU TR2 BA RBF FT TR 230/69 kV PITUACU TR2 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  PITUACU TR 230/69 kV PITUACU TR1 BA RBF FT TR 230/69 kV PITUACU TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  PITUACU MG 230 kV PITUACU MG1 BA RB FT MG 230 kV PITUACU MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,887,410.85
  POCOES II IB 138 kV MG 230 kV POCOES II MG1 BA IB1 DIT   005/2012 IPCA RPEC CC 005/2012 28/10/2019 10/5/2042 234,270.60
  POCOES II MC 138 kV TR 230/138 kV POCOES II TR2 BA RBF FT TR 230/138 kV POCOES II TR2 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/5/2042 343,958.09
  POCOES II MC 138 kV TR 230/138 kV POCOES II TR1 BA RBF FT TR 230/138 kV POCOES II TR1 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/5/2042 343,958.09
  POCOES II IB 230 kV MG 230 kV POCOES II MG1 BA IB1 RB FT MG 230 kV POCOES II MG1 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/5/2042 396,593.93
  POCOES II EL 138 kV POCOES II  DIST3 DIT   005/2012 IPCA RPEC CC 005/2012 28/10/2019 10/5/2042 402,850.81
  POCOES II EL 138 kV POCOES II  DIST2 DIT   005/2012 IPCA RPEC CC 005/2012 28/10/2019 10/5/2042 402,850.81
  POCOES II EL 138 kV POCOES II  DIST1 DIT   005/2012 IPCA RPEC CC 005/2012 28/10/2019 10/5/2042 402,850.81
  POCOES II MC 230 kV TR 230/138 kV POCOES II TR2 BA RBF FT TR 230/138 kV POCOES II TR2 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/5/2042 454,396.54
  POCOES II MC 230 kV TR 230/138 kV POCOES II TR1 BA RBF FT TR 230/138 kV POCOES II TR1 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/5/2042 454,396.54
  POCOES II MG 230 kV POCOES II MG1 BA RB FT MG 230 kV POCOES II MG1 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/5/2042 1,326,398.28
  POCOES II TR 230/138 kV POCOES II TR2 BA RBF FT TR 230/138 kV POCOES II TR2 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/5/2042 1,470,004.46
  POCOES II TR 230/138 kV POCOES II TR1 BA RBF FT TR 230/138 kV POCOES II TR1 BA 005/2012 IPCA RBL CC 005/2012 28/10/2019 10/5/2042 1,470,004.46
  POLO TT 69/69 kV POLO TT1 BA DIT   014/2010 IPCA RPEC CC 014/2010 11/4/2016 6/10/2040 30,311.10
  POLO MC 69 kV TT 69/69 kV POLO TT1 BA DIT   014/2010 IPCA RPEC CC 014/2010 11/4/2016 6/10/2040 32,768.70
  POLO MG 230 kV POLO MG2 BA RB FT MG 230 kV POLO MG2 BA 014/2010 IPCA RBNI REA 5686/2016 6/9/2018 6/9/2049 36,676.35
  POLO IB 69 kV MG 230 kV POLO MG2 BA IB1 DIT   014/2010 IPCA RPEC CC 014/2010 11/4/2016 6/10/2040 49,218.35
  POLO MG 230 kV POLO MG2 BA RB FT MG 230 kV POLO MG2 BA 014/2010 IPCA RBNI REA 5686/2016 6/9/2018 6/9/2049 73,352.71
  POLO EL 69 kV POLO  DIST5 DIT   014/2010 IPCA RPEC CC 014/2010 11/4/2016 6/10/2040 85,218.31
  POLO EL 69 kV POLO  DIST4 DIT   014/2010 IPCA RPEC CC 014/2010 11/4/2016 6/10/2040 85,218.31
  POLO EL 69 kV POLO  DIST3 DIT   014/2010 IPCA RPEC CC 014/2010 11/4/2016 6/10/2040 85,218.31
  POLO EL 69 kV POLO  DIST2 DIT   014/2010 IPCA RPEC CC 014/2010 11/4/2016 6/10/2040 85,218.31
  POLO EL 69 kV POLO  DIST1 DIT   014/2010 IPCA RPEC CC 014/2010 11/4/2016 6/10/2040 85,218.31
  POLO MC 69 kV TR 230/69 kV POLO TR1 BA RBF FT TR 230/69 kV POLO TR1 BA 014/2010 IPCA RBL CC 014/2010 11/4/2016 6/10/2040 94,012.95
  POLO MC 230 kV TR 230/69 kV POLO TR1 BA RBF FT TR 230/69 kV POLO TR1 BA 014/2010 IPCA RBL CC 014/2010 11/4/2016 6/10/2040 236,418.59
  POLO TT 69/0 kV POLO TT2 BA DIT   014/2010 IPCA RCDM REA 5686/2016 6/9/2018 6/9/2048 254,421.88
  POLO MG 230 kV POLO MG2 BA RB FT MG 230 kV POLO MG2 BA 014/2010 IPCA RBNI REA 5686/2016 6/9/2018 6/9/2050 254,650.73
  POLO MC 69 kV TT 69/0 kV POLO TT2 BA DIT   014/2010 IPCA RCDM REA 5686/2016 6/9/2018 6/9/2038 268,632.71
  POLO MC 69 kV TR 230/69 kV POLO TR3 BA RBF FT TR 230/69 kV POLO TR3 BA 014/2010 IPCA RBNI REA 5686/2016 6/9/2018 6/9/2040 400,470.53
  POLO MC 69 kV TR 230/69 kV POLO TR2 BA RBF FT TR 230/69 kV POLO TR2 BA 014/2010 IPCA RBNI REA 5686/2016 6/9/2018 6/9/2040 400,470.53
  POLO MG 230 kV POLO MG2 BA RB FT MG 230 kV POLO MG2 BA 014/2010 IPCA RBL CC 014/2010 11/4/2016 6/10/2040 523,956.00
  POLO TR 230/69 kV POLO TR1 BA RBF FT TR 230/69 kV POLO TR1 BA 014/2010 IPCA RBL CC 014/2010 11/4/2016 6/10/2040 613,145.50
  POLO MC 230 kV TR 230/69 kV POLO TR3 BA RBF FT TR 230/69 kV POLO TR3 BA 014/2010 IPCA RBNI REA 5686/2016 6/9/2018 6/9/2041 1,084,989.97
  POLO MC 230 kV TR 230/69 kV POLO TR2 BA RBF FT TR 230/69 kV POLO TR2 BA 014/2010 IPCA RBNI REA 5686/2016 6/9/2018 6/9/2041 1,084,989.97
  POLO TR 230/69 kV POLO TR3 BA RBF FT TR 230/69 kV POLO TR3 BA 014/2010 IPCA RBNI REA 5686/2016 6/9/2018 6/9/2052 1,433,494.31
  POLO TR 230/69 kV POLO TR2 BA RBF FT TR 230/69 kV POLO TR2 BA 014/2010 IPCA RBNI REA 5686/2016 6/9/2018 6/9/2052 1,433,494.31
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 643/2014 3/10/2013 2/10/2043 16,561.29
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/01/2016 28/01/2046 17,707.33
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/01/2016 28/01/2046 17,707.33
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/01/2016 28/01/2046 17,707.33
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/01/2016 28/01/2046 17,707.33
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 29/01/2016 28/01/2046 17,707.33
  QUIXADA MG 500 kV QUIXADA MG1 CE RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RMEL REN 443/2011 3/10/2016 2/10/2033 30,527.41
  QUIXADA RTL 500 kV 180 Mvar QUIXADA RT1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 643/2014 25/10/2013 24/10/2048 44,471.54
  QUIXADA MC 500 kV RTL 500 kV 180 Mvar QUIXADA RT1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 443/2011 28/02/2016 27/02/2046 53,243.65
  QUIXADA EL 500 kV QUIXADA LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RMEL REN 443/2011 28/02/2016 27/02/2046 54,929.06
  QUIXADA EL 500 kV QUIXADA LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RMEL REN 443/2011 28/02/2016 27/02/2046 54,929.06
  QUIXADA EL 500 kV QUIXADA LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBNI REA 5484/2015 14/02/2020 13/02/2053 234,821.65
  QUIXADA MC 500 kV RTL 500 kV 180 Mvar QUIXADA RT1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  QUIXADA RTL 500 kV 60 Mvar QUIXADA RTR1 CE RB FT RTL 500 kV 60 Mvar QUIXADA RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,025.77
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB2 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  QUIXADA IB 500 kV MG 500 kV QUIXADA MG1 CE IB1 RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  QUIXADA EL 500 kV QUIXADA LT 500 kV QUIXADA /FORTALEZA II C-1 CE RB FT LT 500 kV QUIXADA /FORTALEZA II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  QUIXADA EL 500 kV QUIXADA LT 500 kV MILAGRES /QUIXADA C-1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  QUIXADA MG 500 kV QUIXADA MG1 CE RB FT MG 500 kV QUIXADA MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 738,087.84
  QUIXADA RTL 500 kV 180 Mvar QUIXADA RT1 CE RB FT LT 500 kV MILAGRES /QUIXADA C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 852,077.32
  QUIXERE MG 230 kV QUIXERE MGA1 CE RB FT MG 230 kV QUIXERE MGA1 CE 061/2001 IPCA RBNI REA 6894/2018 1/7/2018 11/11/2033 46,309.26
  QUIXERE IB 230 kV MG 230 kV QUIXERE MGA1 CE IB1 RB FT MG 230 kV QUIXERE MGA1 CE 061/2001 IPCA RBNI REA 6894/2018 1/7/2018 11/11/2039 73,856.21
  QUIXERE EL 230 kV QUIXERE LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RBNI REA 6894/2018 1/7/2018 11/11/2038 121,848.74
  QUIXERE EL 230 kV QUIXERE LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN RB FT LT 230 kV QUIXERE /MOSSORO II C-1 CE/RN 061/2001 IPCA RBNI REA 6894/2018 1/7/2018 11/11/2038 121,848.74
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBNI REA 5861/2016 9/5/2017 8/5/2032 379.61
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBNI REA 5861/2016 31/05/2014 30/05/2029 3,983.07
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBNI REA 5861/2016 31/05/2014 30/05/2029 3,983.07
  RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBNI REA 7761/2019 2/5/2019 1/5/2034 13,039.01
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-2 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-2 PE 061/2001 IPCA RBNI REA 7761/2019 2/5/2019 1/5/2034 13,039.01
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RBNI REA 7761/2019 2/5/2019 1/5/2034 13,039.01
  RECIFE II EL 230 kV RECIFE II LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 7761/2019 2/5/2019 1/5/2034 13,039.01
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RMEL REN 443/2011 8/11/2015 7/11/2045 13,761.92
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RMEL REN 443/2011 8/11/2015 7/11/2045 13,761.92
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RMEL REN 443/2011 8/11/2015 7/11/2045 13,761.92
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RMEL REN 443/2011 23/01/2016 22/01/2046 13,842.26
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RMEL REN 443/2011 23/01/2016 22/01/2046 13,842.26
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RMEL REN 443/2011 23/01/2016 22/01/2046 13,842.26
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RMEL REN 443/2011 1/7/2016 30/06/2044 15,490.10
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RMEL REN 443/2011 28/07/2016 27/07/2044 15,523.62
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB4 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 7/8/2015 6/8/2045 17,470.83
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB4 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 7/8/2015 6/8/2045 17,470.83
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB4 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 7/8/2015 6/8/2045 17,470.83
  RECIFE II EL 500 kV RECIFE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RMEL REN 443/2011 21/08/2015 20/08/2045 17,489.74
  RECIFE II EL 500 kV RECIFE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RMEL REN 443/2011 21/08/2015 20/08/2045 17,489.74
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 25/09/2015 24/09/2045 17,537.05
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 25/09/2015 24/09/2045 17,537.05
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB3 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/09/2015 29/09/2045 17,543.81

 

116 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB3 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 443/2011 30/09/2015 29/09/2045 17,543.81
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RMEL REN 443/2011 5/11/2015 4/11/2045 17,592.47
  RECIFE II TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RMEL REN 643/2014 22/09/2013 21/09/2047 18,543.24
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 25,397.05
  RECIFE II EL 500 kV RECIFE II LT 500 kV PAU FERRO /RECIFE II C-1 PE RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 5861/2016 8/6/2016 7/6/2044 27,147.36
  RECIFE II TR 69/13,8 kV RECIFE II TR2 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  RECIFE II TR 69/13,8 kV RECIFE II TR1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RMEL REN 443/2011 5/11/2015 4/11/2045 35,184.93
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RMEL REN 643/2014 8/12/2013 7/12/2041 38,345.05
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RMEL REN 643/2014 28/02/2014 27/02/2042 38,617.38
  RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2042 38,717.01
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2042 38,717.01
  RECIFE II TR 69/13,8 kV RECIFE II TR2 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  RECIFE II TR 69/13,8 kV RECIFE II TR1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBNI REA 2376/2010 1/5/2012 30/04/2040 46,997.68
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 643/2014 7/6/2013 6/6/2030 54,095.64
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2044 56,042.48
  RECIFE II MC 69 kV TR 69/13,8 kV RECIFE II TR2 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  RECIFE II MC 69 kV TR 69/13,8 kV RECIFE II TR1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044 61,728.34
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RMEL REN 643/2014 23/02/2014 22/02/2044 61,728.34
  RECIFE II MC 13,8 kV CS 150/-105 MVAr RECIFE II CS2 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,856.97
  RECIFE II MC 13,8 kV CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,856.97
  RECIFE II EL 69 kV RECIFE II LT 69 kV JABOATAO /RECIFE II C-1 RJ/PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,128.71
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RBNI REA 6137/2016 16/06/2020 16/06/2047 80,857.30
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBNI REA 6137/2016 16/06/2020 16/06/2047 80,857.30
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 80,887.02
  RECIFE II TR 69/13,8 kV RECIFE II TR2 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  RECIFE II TR 69/13,8 kV RECIFE II TR1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  RECIFE II MC 13,8 kV CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 86,766.78
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBNI REA 6137/2016 15/07/2020 15/07/2046 93,109.85
  RECIFE II MC 230 kV TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBNI REA 6137/2016 31/07/2020 31/07/2046 93,109.85
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBNI REA 6137/2016 31/07/2020 31/07/2050 96,586.18
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBNI REA 2040/2009 29/04/2015 28/04/2045 98,518.01
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBNI REA 2040/2009 29/04/2015 28/04/2045 98,518.01
  RECIFE II EL 69 kV RECIFE II LT 69 kV JABOATAO /RECIFE II C-1 RJ/PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 99,565.35
  RECIFE II EL 500 kV RECIFE II LT 500 kV PAU FERRO /RECIFE II C-1 PE RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 5861/2016 8/6/2016 7/6/2031 103,359.64
  RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 6137/2016 3/1/2021 3/1/2051 104,202.85
  RECIFE II IB 230 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  RECIFE II IB 230 kV MG 500 kV RECIFE II MG1 PE IB1 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  RECIFE II MC 230 kV TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBNI REA 6137/2016 12/8/2020 12/8/2050 179,996.62
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RBNI REA 6137/2016 26/07/2021 26/07/2051 179,996.62
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBNI REA 6137/2016 26/04/2021 26/04/2051 179,996.62
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBNI REA 6137/2016 7/3/2021 7/3/2051 179,996.62
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBNI REA 6137/2016 7/6/2021 7/6/2051 179,996.62
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBNI REA 6137/2016 20/01/2021 20/01/2051 179,996.62
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBNI REA 6137/2016 7/6/2021 7/6/2051 179,996.62
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-3 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-3 PE 061/2001 IPCA RBNI REA 6137/2016 5/4/2021 5/4/2051 179,996.62
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-2 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-2 PE 061/2001 IPCA RBNI REA 6137/2016 21/12/2020 21/12/2050 179,996.62
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBNI REA 6137/2016 24/07/2020 24/07/2050 179,996.62
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-2 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-2 PE 061/2001 IPCA RBNI REA 6137/2016 28/06/2021 28/06/2051 179,996.62
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RBNI REA 6137/2016 17/05/2021 17/05/2051 179,996.62
  RECIFE II EL 230 kV RECIFE II LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 6137/2016 20/01/2021 20/01/2051 179,996.62
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 188,063.88
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 188,063.88
  RECIFE II IB 230 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,444.63
  RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,444.63
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RBNI REA 6137/2016 16/06/2020 16/06/2051 203,036.93
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,618.63
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR2 PE RB FT TR 500/230 kV RECIFE II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,618.63
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,618.63
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  RECIFE II MC 230 kV TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  RECIFE II RTL 500 kV 33,3 Mvar RECIFE II RTR1 PE RB FT RTL 500 kV 33,3 Mvar RECIFE II RTR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 233,867.79
  RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RECIFE II EL 230 kV RECIFE II LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PIRAPAMA II C-2 PE RB FT LT 230 kV RECIFE II /PIRAPAMA II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-2 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /PAU FERRO C-1 PE RB FT LT 230 kV RECIFE II /PAU FERRO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-3 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-2 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /MIRUEIRA C-1 PE RB FT LT 230 kV RECIFE II /MIRUEIRA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-3 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-2 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JABOATAO II C-1 PE RB FT LT 230 kV RECIFE II /JABOATAO II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-2 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /GOIANINHA C-1 PE RB FT LT 230 kV RECIFE II /GOIANINHA C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RECIFE II EL 230 kV RECIFE II LT 230 kV ANGELIM /RECIFE II C-1 PE RB FT LT 230 kV ANGELIM /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RECIFE II TR 230/13,8 kV RECIFE II TRR1 PE RB FT TR 230/13,8 kV RECIFE II TRR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 246,763.97
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 259,600.45
  RECIFE II MC 500 kV RTL 500 kV 100 MVAr RECIFE II RT2 PE RB FT RTL 500 kV 100 MVAr RECIFE II RT2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  RECIFE II MC 500 kV RTL 500 kV 100 MVAr RECIFE II RT1 PE RB FT RTL 500 kV 100 MVAr RECIFE II RT1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40

 

117 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,310.27
  RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,310.27
  RECIFE II CS 150/-105 MVAr RECIFE II CS2 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RMEL REN 443/2011 11/11/2016 10/11/2041 282,779.48
  RECIFE II CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RMEL REN 443/2011 5/3/2016 4/3/2041 285,614.14
  RECIFE II RTL 500 kV 33,3 Mvar RECIFE II RTR1 PE RB FT RTL 500 kV 33,3 Mvar RECIFE II RTR1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,827.46
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBNI REA 6137/2016 6/8/2020 6/8/2051 323,100.33
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR2 PE RB FT TR 500/230 kV RECIFE II TR2 PE 061/2001 IPCA RBNI REA 6137/2016 16/06/2020 16/06/2051 323,100.33
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  RECIFE II TR 230/13,8 kV RECIFE II TRR1 PE RB FT TR 230/13,8 kV RECIFE II TRR1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 340,629.15
  RECIFE II IB 230 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 419,410.17
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR2 PE RB FT TR 500/230 kV RECIFE II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB4 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB3 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB2 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB1 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  RECIFE II EL 500 kV RECIFE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  RECIFE II EL 500 kV RECIFE II LT 500 kV PAU FERRO /RECIFE II C-1 PE RB FT LT 500 kV PAU FERRO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  RECIFE II EL 500 kV RECIFE II LT 500 kV ANGELIM II /RECIFE II C-2 PE RB FT LT 500 kV ANGELIM II /RECIFE II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  RECIFE II MC 230 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  RECIFE II MC 230 kV BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 569,452.46
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC2 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 603,913.08
  RECIFE II BC 230 kV 50,5 MVAr RECIFE II BC1 PE RB FT BC 230 kV 50,5 MVAr RECIFE II BC1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 603,913.08
  RECIFE II IB 500 kV MG 500 kV RECIFE II MG1 PE IB1 RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  RECIFE II TR 500/230 kV RECIFE II TRR1 PE RB FT TR 500/230 kV RECIFE II TRR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 647,846.29
  RECIFE II TR 500/230 kV RECIFE II TR4C PE RB FT TR 500/230 kV RECIFE II TR4C PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 647,846.29
  RECIFE II EL 500 kV RECIFE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  RECIFE II RTL 500 kV 100 MVAr RECIFE II RT2 PE RB FT RTL 500 kV 100 MVAr RECIFE II RT2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 701,859.07
  RECIFE II RTL 500 kV 100 MVAr RECIFE II RT1 PE RB FT RTL 500 kV 100 MVAr RECIFE II RT1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 701,859.07
  RECIFE II EL 230 kV RECIFE II LT 230 kV RECIFE II /JOAIRAM C-1 PE RB FT LT 230 kV RECIFE II /JOAIRAM C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  RECIFE II TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 740,291.92
  RECIFE II TR 230/13,8 kV RECIFE II TRR1 PE RB FT TR 230/13,8 kV RECIFE II TRR1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 747,194.80
  RECIFE II TR 500/230 kV RECIFE II TRR1 PE RB FT TR 500/230 kV RECIFE II TRR1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 894,276.94
  RECIFE II RTL 500 kV 100 MVAr RECIFE II RT2 PE RB FT RTL 500 kV 100 MVAr RECIFE II RT2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 968,835.33
  RECIFE II RTL 500 kV 100 MVAr RECIFE II RT1 PE RB FT RTL 500 kV 100 MVAr RECIFE II RT1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 968,835.33
  RECIFE II TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,021,887.45
  RECIFE II MC 500 kV TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,306,279.44
  RECIFE II EL 500 kV RECIFE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,480,048.26
  RECIFE II CS 150/-105 MVAr RECIFE II CS2 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,683,466.69
  RECIFE II CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,683,466.69
  RECIFE II TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  RECIFE II TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  RECIFE II TR 500/230 kV RECIFE II TR2 PE RB FT TR 500/230 kV RECIFE II TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  RECIFE II TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  RECIFE II TR 230/13,8 kV RECIFE II TR5 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,241,584.39
  RECIFE II CS 150/-105 MVAr RECIFE II CS2 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,323,831.22
  RECIFE II CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,323,831.22
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,389,016.35
  RECIFE II TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,682,830.82
  RECIFE II TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,682,830.82
  RECIFE II TR 500/230 kV RECIFE II TR2 PE RB FT TR 500/230 kV RECIFE II TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,682,830.82
  RECIFE II TR 500/230 kV RECIFE II TR1 PE RB FT TR 500/230 kV RECIFE II TR1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,682,830.82
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,297,760.99
  RECIFE II CS 150/-105 MVAr RECIFE II CS2 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,097,492.70
  RECIFE II CS 150/-105 MVAr RECIFE II CS1 PE RB FT CS 150/-105 MVAr RECIFE II CS1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,097,492.70
  RECIFE II TR 500/230 kV RECIFE II TR4 PE RB FT TR 500/230 kV RECIFE II TR4 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,884,984.41
  RECIFE II TR 500/230 kV RECIFE II TR3 PE RB FT TR 500/230 kV RECIFE II TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,884,984.41
  RECIFE II MG 500 kV RECIFE II MG1 PE RB FT MG 500 kV RECIFE II MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,233,878.45
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2042 39,530.65
  RIBEIRAO IB 69 kV MG 230 kV RIBEIRAO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  RIBEIRAO IB 69 kV MG 230 kV RIBEIRAO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR1 PE RBF FT TR 230/69 kV RIBEIRAO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  RIBEIRAO EL 69 kV RIBEIRAO  DIST9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIBEIRAO EL 69 kV RIBEIRAO  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIBEIRAO EL 69 kV RIBEIRAO  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIBEIRAO EL 69 kV RIBEIRAO  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIBEIRAO EL 69 kV RIBEIRAO  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIBEIRAO EL 69 kV RIBEIRAO  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIBEIRAO EL 69 kV RIBEIRAO  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIBEIRAO EL 69 kV RIBEIRAO  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIBEIRAO EL 69 kV RIBEIRAO  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIBEIRAO EL 69 kV RIBEIRAO  DIS10 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  RIBEIRAO TT 69/13,8 kV RIBEIRAO TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  RIBEIRAO TT 69/0 kV RIBEIRAO TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  RIBEIRAO EL 69 kV RIBEIRAO  DIST9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  RIBEIRAO EL 69 kV RIBEIRAO  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  RIBEIRAO EL 69 kV RIBEIRAO  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  RIBEIRAO EL 69 kV RIBEIRAO  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82

 

118 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  RIBEIRAO EL 69 kV RIBEIRAO  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  RIBEIRAO EL 69 kV RIBEIRAO  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  RIBEIRAO EL 69 kV RIBEIRAO  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  RIBEIRAO EL 69 kV RIBEIRAO  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  RIBEIRAO EL 69 kV RIBEIRAO  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  RIBEIRAO MG 230 kV RIBEIRAO MG1 PE RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBNI REA 3817/2013 20/08/2019 20/08/2050 114,769.74
  RIBEIRAO IB 230 kV MG 230 kV RIBEIRAO MG1 PE IB1 RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  RIBEIRAO TT 69/13,8 kV RIBEIRAO TA1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  RIBEIRAO IB 69 kV MG 230 kV RIBEIRAO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR1 PE RBF FT TR 230/69 kV RIBEIRAO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  RIBEIRAO IB 230 kV MG 230 kV RIBEIRAO MG1 PE IB1 RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 166,420.18
  RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  RIBEIRAO EL 69 kV RIBEIRAO  DIST9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  RIBEIRAO EL 69 kV RIBEIRAO  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  RIBEIRAO EL 69 kV RIBEIRAO  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  RIBEIRAO EL 69 kV RIBEIRAO  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  RIBEIRAO EL 69 kV RIBEIRAO  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  RIBEIRAO EL 69 kV RIBEIRAO  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  RIBEIRAO EL 69 kV RIBEIRAO  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  RIBEIRAO EL 69 kV RIBEIRAO  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  RIBEIRAO EL 69 kV RIBEIRAO  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  RIBEIRAO MG 230 kV RIBEIRAO MG1 PE RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBNI REA 3965/2013 14/11/2016 13/11/2044 266,136.50
  RIBEIRAO TT 69/13,8 kV RIBEIRAO TA1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  RIBEIRAO IB 230 kV MG 230 kV RIBEIRAO MG1 PE IB1 RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 365,054.76
  RIBEIRAO TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  RIBEIRAO TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  RIBEIRAO TR 230/69 kV RIBEIRAO TR1 PE RBF FT TR 230/69 kV RIBEIRAO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  RIBEIRAO MC 69 kV TR 230/69 kV RIBEIRAO TR4 PE RBF FT TR 230/69 kV RIBEIRAO TR4 PE 061/2001 IPCA RBNI REA 3965/2013 14/11/2016 13/11/2046 449,874.44
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  RIBEIRAO TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  RIBEIRAO TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  RIBEIRAO MG 230 kV RIBEIRAO MG1 PE RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 551,144.88
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV RIBEIRAO /RECIFE II C-1 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV ANGELIM /RIBEIRAO C-1 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV RIBEIRAO /RECIFE II C-2 PE RB FT LT 230 kV RIBEIRAO /RECIFE II C-2 PE 061/2001 IPCA RBNI REA 3817/2013 20/08/2019 20/08/2044 712,221.95
  RIBEIRAO EL 230 kV RIBEIRAO LT 230 kV ANGELIM /RIBEIRAO C-2 PE RB FT LT 230 kV ANGELIM /RIBEIRAO C-1 PE 061/2001 IPCA RBNI REA 3817/2013 20/08/2019 20/08/2044 712,221.95
  RIBEIRAO MG 230 kV RIBEIRAO MG1 PE RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 760,791.81
  RIBEIRAO TR 230/69 kV RIBEIRAO TR3 PE RBF FT TR 230/69 kV RIBEIRAO TR3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  RIBEIRAO TR 230/69 kV RIBEIRAO TR2 PE RBF FT TR 230/69 kV RIBEIRAO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  RIBEIRAO MC 230 kV TR 230/69 kV RIBEIRAO TR4 PE RBF FT TR 230/69 kV RIBEIRAO TR4 PE 061/2001 IPCA RBNI REA 3965/2013 14/11/2016 13/11/2046 1,162,622.42
  RIBEIRAO TR 230/69 kV RIBEIRAO TR4 PE RBF FT TR 230/69 kV RIBEIRAO TR4 PE 061/2001 IPCA RBNI REA 3965/2013 14/11/2016 13/11/2050 1,498,515.03
  RIBEIRAO MG 230 kV RIBEIRAO MG1 PE RB FT MG 230 kV RIBEIRAO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,668,852.15
  RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 25,946.62
  RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RMEL REN 643/2014 9/8/2013 8/8/2030 27,876.81
  RIO LARGO II TR 69/13,8 kV RIO LARGO II TR4 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  RIO LARGO II TR 69/13,8 kV RIO LARGO II TR4 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  RIO LARGO II IB 69 kV MG 230 kV RIO LARGO II MG1 AL IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  RIO LARGO II IB 69 kV MG 230 kV RIO LARGO II MG1 AL IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  RIO LARGO II MC 69 kV TR 69/13,8 kV RIO LARGO II TR4 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  RIO LARGO II MC 69 kV TR 230/69 kV RIO LARGO II TR3 AL RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  RIO LARGO II MC 69 kV TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  RIO LARGO II MC 69 kV BC 69 kV 27,1 Mvar RIO LARGO II BC2 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC4 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC3 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  RIO LARGO II EL 69 kV RIO LARGO II  VAGO DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIO LARGO II EL 69 kV RIO LARGO II  TAB.MARTINS 2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIO LARGO II EL 69 kV RIO LARGO II  TAB.MARTINS 1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIO LARGO II EL 69 kV RIO LARGO II  S.L.QUITUNDE 1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIO LARGO II EL 69 kV RIO LARGO II  RIO LARGO I DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIO LARGO II EL 69 kV RIO LARGO II  R.LARGO I 02L8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RIO LARGO II TR 69/13,8 kV RIO LARGO II TR4 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  RIO LARGO II MC 69 kV TR 69/13,8 kV RIO LARGO II TR4 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  RIO LARGO II MC 69 kV TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  RIO LARGO II TT 69/13,8 kV RIO LARGO II TA2 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  RIO LARGO II TT 69/13,8 kV RIO LARGO II TA1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  RIO LARGO II MC 69 kV BC 69 kV 27,1 Mvar RIO LARGO II BC2 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC4 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC3 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC1 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  RIO LARGO II EL 69 kV RIO LARGO II  VAGO DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  RIO LARGO II EL 69 kV RIO LARGO II  TAB.MARTINS 2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  RIO LARGO II EL 69 kV RIO LARGO II  TAB.MARTINS 1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  RIO LARGO II EL 69 kV RIO LARGO II  S.L.QUITUNDE 1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  RIO LARGO II EL 69 kV RIO LARGO II  RIO LARGO I DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  RIO LARGO II BC 69 kV 21,3 Mvar RIO LARGO II BC4 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,014.30
  RIO LARGO II BC 69 kV 21,3 Mvar RIO LARGO II BC3 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,014.30

 

119 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  RIO LARGO II BC 69 kV 21,3 Mvar RIO LARGO II BC1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,014.30
  RIO LARGO II IB 230 kV MG 230 kV RIO LARGO II MG1 AL IB1 RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  RIO LARGO II TT 69/13,8 kV RIO LARGO II TA2 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  RIO LARGO II TT 69/13,8 kV RIO LARGO II TA1 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  RIO LARGO II BC 69 kV 27,1 Mvar RIO LARGO II BC2 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 134,422.38
  RIO LARGO II MC 230 kV TR 230/69 kV RIO LARGO II TR3 AL RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  RIO LARGO II MC 230 kV TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  RIO LARGO II MC 69 kV TR 69/13,8 kV RIO LARGO II TR4 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  RIO LARGO II MC 230 kV TR 230/69 kV RIO LARGO II TR3 AL RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  RIO LARGO II MC 230 kV TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV RIO LARGO II /BRASKEM C-1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV MESSIAS /RIO LARGO II C-3 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV MESSIAS /RIO LARGO II C-2 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-2 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV MESSIAS /RIO LARGO II C-1 AL RB FT LT 230 kV MESSIAS /RIO LARGO II C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  RIO LARGO II MC 69 kV BC 69 kV 27,1 Mvar RIO LARGO II BC2 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC4 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC3 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  RIO LARGO II MC 69 kV BC 69 kV 21,3 Mvar RIO LARGO II BC1 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  RIO LARGO II TT 69/13,8 kV RIO LARGO II TA2 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  RIO LARGO II TT 69/13,8 kV RIO LARGO II TA1 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  RIO LARGO II EL 69 kV RIO LARGO II  R.LARGO I 02L8 DIT   061/2001 IPCA RCDM REA 1814/2009 30/09/2012 29/09/2043 296,796.73
  RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  RIO LARGO II TR 230/69 kV RIO LARGO II TR3 AL RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  RIO LARGO II TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  RIO LARGO II MC 69 kV TR 230/69 kV RIO LARGO II TR5 AL RBF FT TR 230/69 kV RIO LARGO II TR5 AL 061/2001 IPCA RBNI REA 2823/2011 17/02/2014 16/02/2045 446,142.21
  RIO LARGO II TR 230/69 kV RIO LARGO II TR3 AL RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  RIO LARGO II TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 579,789.80
  RIO LARGO II EL 230 kV RIO LARGO II LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL RB FT LT 230 kV RIO LARGO II /ARAPIRACA III C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 800,332.82
  RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBNI REA 2823/2011 17/02/2014 16/02/2044 1,034,624.90
  RIO LARGO II TR 230/69 kV RIO LARGO II TR3 AL RBF FT TR 230/69 kV RIO LARGO II TR3 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  RIO LARGO II TR 230/69 kV RIO LARGO II TR1 AL RBF FT TR 230/69 kV RIO LARGO II TR1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  RIO LARGO II MC 230 kV TR 230/69 kV RIO LARGO II TR5 AL RBF FT TR 230/69 kV RIO LARGO II TR5 AL 061/2001 IPCA RBNI REA 2823/2011 17/02/2014 16/02/2044 1,144,615.35
  RIO LARGO II TR 230/69 kV RIO LARGO II TR5 AL RBF FT TR 230/69 kV RIO LARGO II TR5 AL 061/2001 IPCA RBNI REA 2823/2011 17/02/2014 16/02/2048 1,411,668.88
  RIO LARGO II MG 230 kV RIO LARGO II MG1 AL RB FT MG 230 kV RIO LARGO II MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,755,588.22
  RUSSAS II EL 69 kV RUSSAS II  DIST2 DIT   061/2001 IPCA RMEL REN 443/2011 24/04/2016 23/04/2046 8,380.08
  RUSSAS II EL 230 kV RUSSAS II LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RMEL REN 443/2011 1/5/2016 30/04/2046 13,946.89
  RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RMEL REN 443/2011 17/05/2016 16/05/2046 13,963.80
  RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RMEL REN 643/2014 31/01/2014 30/01/2031 26,386.31
  RUSSAS II MC 69 kV TT 69/13,8 kV RUSSAS II TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBNI REA 7761/2019 31/07/2015 30/07/2030 28,332.33
  RUSSAS II EL 69 kV RUSSAS II  DIST4 DIT   061/2001 IPCA RMEL REN 643/2014 9/2/2014 8/2/2044 35,902.62
  RUSSAS II IB 69 kV MG 230 kV RUSSAS II MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  RUSSAS II EL 230 kV RUSSAS II LT 230 kV BANABUIU /RUSSAS II C-1 CE RB FT LT 230 kV BANABUIU /RUSSAS II C-1 CE 061/2001 IPCA RMEL REN 443/2011 16/07/2017 15/07/2047 45,201.37
  RUSSAS II MC 69 kV TR 230/69 kV RUSSAS II TR3 CE RBF FT TR 230/69 kV RUSSAS II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  RUSSAS II MC 69 kV TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  RUSSAS II MC 230 kV TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RMEL REN 443/2011 9/7/2017 8/7/2047 67,767.72
  RUSSAS II EL 230 kV RUSSAS II LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RMEL REN 443/2011 23/07/2017 22/07/2047 67,836.35
  RUSSAS II EL 69 kV RUSSAS II  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RUSSAS II EL 69 kV RUSSAS II  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RUSSAS II EL 69 kV RUSSAS II  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RUSSAS II EL 69 kV RUSSAS II  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RUSSAS II EL 69 kV RUSSAS II  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  RUSSAS II TT 69/13,8 kV RUSSAS II TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  RUSSAS II EL 69 kV RUSSAS II  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  RUSSAS II EL 69 kV RUSSAS II  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  RUSSAS II IB 230 kV MG 230 kV RUSSAS II MG1 CE IB1 RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  RUSSAS II MC 230 kV TR 230/69 kV RUSSAS II TR3 CE RBF FT TR 230/69 kV RUSSAS II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  RUSSAS II MC 230 kV TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBNI REA 2823/2011 29/09/2014 28/09/2042 195,750.71
  RUSSAS II EL 230 kV RUSSAS II LT 230 kV RUSSAS II /QUIXERE C-1 CE RB FT LT 230 kV RUSSAS II /QUIXERE C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RUSSAS II EL 230 kV RUSSAS II LT 230 kV BANABUIU /RUSSAS II C-1 CE RB FT LT 230 kV BANABUIU /RUSSAS II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  RUSSAS II TT 69/13,8 kV RUSSAS II TA2 CE DIT   061/2001 IPCA RCDM REA 2412/2010 20/06/2012 19/06/2042 275,446.19
  RUSSAS II MC 69 kV TT 69/13,8 kV RUSSAS II TA2 CE DIT   061/2001 IPCA RCDM REA 2412/2010 20/06/2012 19/06/2043 296,651.45
  RUSSAS II TR 230/69 kV RUSSAS II TR3 CE RBF FT TR 230/69 kV RUSSAS II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  RUSSAS II TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  RUSSAS II MC 69 kV TR 230/69 kV RUSSAS II TR4 CE RBF FT TR 230/69 kV RUSSAS II TR4 CE 061/2001 IPCA RBNI REA 2823/2011 29/09/2014 28/09/2045 452,937.63
  RUSSAS II TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 526,801.15
  RUSSAS II EL 230 kV RUSSAS II LT 230 kV RUSSAS II /BANABUIU C-1 CE RB FT LT 230 kV RUSSAS II /BANABUIU C-1 CE 018/2012 IPCA RBL CC 018/2012 15/12/2020 1/6/2042 537,773.26
  RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 727,188.11
  RUSSAS II TR 230/69 kV RUSSAS II TR1 CE RBF FT TR 230/69 kV RUSSAS II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  RUSSAS II MC 230 kV TR 230/69 kV RUSSAS II TR4 CE RBF FT TR 230/69 kV RUSSAS II TR4 CE 061/2001 IPCA RBNI REA 2823/2011 29/09/2014 28/09/2044 1,274,169.00
  RUSSAS II TR 230/69 kV RUSSAS II TR4 CE RBF FT TR 230/69 kV RUSSAS II TR4 CE 061/2001 IPCA RBNI REA 2823/2011 29/09/2014 28/09/2048 1,431,102.97
  RUSSAS II MG 230 kV RUSSAS II MG1 CE RB FT MG 230 kV RUSSAS II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,595,139.99
  S.JOAO PIAUI MC 69 kV RTN 69 kV 0 Mvar S.JOAO PIAUI RTN2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,755.22
  S.JOAO PIAUI MC 69 kV RTN 69 kV 0 Mvar S.JOAO PIAUI RTN1 PI RB FT RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,755.22
  S.JOAO PIAUI RTN 69 kV 0 Mvar S.JOAO PIAUI RTN2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 14,361.37
  S.JOAO PIAUI RTN 69 kV 0 Mvar S.JOAO PIAUI RTN1 PI RB FT RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 14,361.37
  S.JOAO PIAUI MC 69 kV TT 69/13,8 kV S.JOAO PIAUI TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  S.JOAO PIAUI EL 230 kV S.JOAO PIAUI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  S.JOAO PIAUI TR 69/13,8 kV S.JOAO PIAUI TR5 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RMEL REN 643/2014 16/12/2014 15/12/2031 29,156.85
  S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035 34,195.72

 

120 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBNI REN 905/2020 23/10/2017 22/10/2048 38,654.12
  S.JOAO PIAUI TR 69/13,8 kV S.JOAO PIAUI TR5 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  S.JOAO PIAUI IB 69 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  S.JOAO PIAUI MC 13,8 kV TR 69/13,8 kV S.JOAO PIAUI TR5 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  S.JOAO PIAUI MC 13,8 kV TR 500/230 kV S.JOAO PIAUI TR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  S.JOAO PIAUI IB 69 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  S.JOAO PIAUI MC 69 kV TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  S.JOAO PIAUI MC 69 kV TR 230/69 kV S.JOAO PIAUI TR3 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  S.JOAO PIAUI EL 69 kV S.JOAO PIAUI  S.MENDES-02J1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  S.JOAO PIAUI EL 69 kV S.JOAO PIAUI  C.BURITI-02J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  S.JOAO PIAUI TT 69/13,8 kV S.JOAO PIAUI TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  S.JOAO PIAUI TT 69/13,8 kV S.JOAO PIAUI TA1 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  S.JOAO PIAUI IB 230 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBNI REA 2460/2010 23/12/2013 22/12/2043 165,760.34
  S.JOAO PIAUI MC 230 kV TR 500/230 kV S.JOAO PIAUI TR1 PI MC2 RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  S.JOAO PIAUI MC 230 kV TR 500/230 kV S.JOAO PIAUI TR1 PI MC1 RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  S.JOAO PIAUI MC 230 kV TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  S.JOAO PIAUI MC 230 kV TR 230/69 kV S.JOAO PIAUI TR3 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  S.JOAO PIAUI IB 230 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 192,521.93
  S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR3 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 192,521.93
  S.JOAO PIAUI MC 230 kV TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  S.JOAO PIAUI EL 230 kV S.JOAO PIAUI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  S.JOAO PIAUI EL 230 kV S.JOAO PIAUI LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI RB FT LT 230 kV S.JOAO PIAUI /ELISEU MARTIN C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  S.JOAO PIAUI MC 500 kV RTL 500 kV 100 MVAr S.JOAO PIAUI RT2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  S.JOAO PIAUI MC 500 kV RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI RB FT RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 265,754.27
  S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR3 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR3 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 265,754.27
  S.JOAO PIAUI EL 230 kV S.JOAO PIAUI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  S.JOAO PIAUI IB 230 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 419,410.17
  S.JOAO PIAUI MC 69 kV TR 230/69 kV S.JOAO PIAUI TR8 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR8 PI 061/2001 IPCA RBNI REA 2460/2010 23/12/2013 22/12/2043 419,478.50
  S.JOAO PIAUI MC 500 kV TR 500/230 kV S.JOAO PIAUI TR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  S.JOAO PIAUI IB 500 kV MG 500 kV S.JOAO PIAUI MG1 PI IB2 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  S.JOAO PIAUI IB 500 kV MG 500 kV S.JOAO PIAUI MG1 PI IB1 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  S.JOAO PIAUI EL 69 kV S.JOAO PIAUI  DIST1 DIT   061/2001 IPCA RCDM REN 905/2020 23/10/2017 22/10/2044 466,795.52
  S.JOAO PIAUI EL 500 kV S.JOAO PIAUI LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  S.JOAO PIAUI EL 500 kV S.JOAO PIAUI LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  S.JOAO PIAUI TR 500/230 kV S.JOAO PIAUI TRR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TRR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 504,801.61
  S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RMEL REA 9918/2021 26/05/2021 26/05/2057 531,123.46
  S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RMEL REA 9918/2021 26/05/2021 26/05/2057 531,123.46
  S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR4 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 582,951.31
  S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR3 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR3 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 582,951.31
  S.JOAO PIAUI TR 500/230 kV S.JOAO PIAUI TRR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TRR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 696,820.29
  S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 701,859.07
  S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI RB FT RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 701,859.07
  S.JOAO PIAUI EL 230 kV S.JOAO PIAUI LT 230 kV S.JOAO PIAUI /PICOS C-1 PI RB FT LT 230 kV S.JOAO PIAUI /PICOS C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  S.JOAO PIAUI MC 500 kV TR 500/230 kV S.JOAO PIAUI TR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBNI REA 3208/2011 16/11/2016 15/11/2047 862,215.00
  S.JOAO PIAUI IB 500 kV MG 500 kV S.JOAO PIAUI MG1 PI IB2 RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBNI REA 3208/2011 3/11/2016 2/11/2047 913,357.98
  S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 968,835.33
  S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI RB FT RTL 500 kV 100 MVAr S.JOAO PIAUI RT1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 968,835.33
  S.JOAO PIAUI TR 230/69 kV S.JOAO PIAUI TR8 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR8 PI 061/2001 IPCA RBNI REA 2460/2010 23/12/2013 22/12/2047 1,073,390.70
  S.JOAO PIAUI MC 230 kV TR 230/69 kV S.JOAO PIAUI TR8 PI RBF FT TR 230/69 kV S.JOAO PIAUI TR8 PI 061/2001 IPCA RBNI REA 2460/2010 23/12/2013 22/12/2043 1,186,223.16
  S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,301,263.41
  S.JOAO PIAUI CR 500 kV 436 MVAr S.JOAO PIAUI BC1 PI RB FT CR 500 kV 436 MVAr S.JOAO PIAUI BC1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,398,054.17
  S.JOAO PIAUI TR 500/230 kV S.JOAO PIAUI TR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,514,404.83
  S.JOAO PIAUI CR 500 kV 484 MVAr S.JOAO PIAUI BC2 PI RB FT CR 500 kV 484 MVAr S.JOAO PIAUI BC2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,520,888.48
  S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,796,243.76
  S.JOAO PIAUI TR 500/230 kV S.JOAO PIAUI TR1 PI RB FT TR 500/230 kV S.JOAO PIAUI TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,090,460.86
  S.JOAO PIAUI RTL 500 kV 100 MVAr S.JOAO PIAUI RT2 PI RB FT LT 500 kV S.JOAO PIAUI /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,125,210.73
  S.JOAO PIAUI MG 500 kV S.JOAO PIAUI MG1 PI RB FT MG 500 kV S.JOAO PIAUI MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,940,191.26
  SAN.MATOS II BC 13,8 kV 1,8 Mvar SAN.MATOS II BC1 RN DIT   061/2001 IPCA RMEL REN 643/2014 8/1/2014 7/1/2028 5,937.24
  SAN.MATOS II EL 69 kV SAN.MATOS II  MIGUEL ANGICOS DIT   061/2001 IPCA RMEL REN 443/2011 17/03/2016 16/03/2039 6,949.10
  SAN.MATOS II EL 69 kV SAN.MATOS II  MIGUEL ANGICOS DIT   061/2001 IPCA RMEL REN 443/2011 17/03/2016 16/03/2046 8,355.93
  SAN.MATOS II EL 69 kV SAN.MATOS II  MIGUEL ANGICOS DIT   061/2001 IPCA RMEL REN 443/2011 17/03/2016 16/03/2046 8,355.93
  SAN.MATOS II BC 13,8 kV 1,8 Mvar SAN.MATOS II BC2 RN DIT   061/2001 IPCA RMEL REN 643/2014 10/1/2014 9/1/2028 9,226.46
  SAN.MATOS II BC 13,8 kV 1,8 Mvar SAN.MATOS II BC2 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  SAN.MATOS II BC 13,8 kV 1,8 Mvar SAN.MATOS II BC1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RMEL REN 643/2014 31/07/2015 30/07/2043 53,343.55
  SAN.MATOS II MC 13,8 kV RTB 13,8 kV 5 Mvar SAN.MATOS II RT1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,151.13
  SAN.MATOS II EL 69 kV SAN.MATOS II  MIGUEL ANGICOS DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,128.71
  SAN.MATOS II EL 69 kV SAN.MATOS II  JUCURUTU DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,128.71
  SAN.MATOS II MC 13,8 kV BC 13,8 kV 1,8 Mvar SAN.MATOS II BC2 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  SAN.MATOS II MC 13,8 kV BC 13,8 kV 1,8 Mvar SAN.MATOS II BC1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2050 90,392.34
  SAN.MATOS II EL 138 kV SAN.MATOS II LT 138 kV ACU II /SAN.MATOS II C-1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 121,238.08
  SAN.MATOS II RTB 13,8 kV 5 Mvar SAN.MATOS II RT1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  SAN.MATOS II RTB 13,8 kV 5 Mvar SAN.MATOS II RT1 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  SAN.MATOS II TT 69/0 kV SAN.MATOS II TA1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2049 184,561.08
  SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2050 248,276.42
  SAN.MATOS II MC 69 kV TR 138/69 kV SAN.MATOS II TR1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2042 257,798.72
  SAN.MATOS II IB 69 kV MG 138 kV SAN.MATOS II MG1 RN IB1 DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2047 276,752.68
  SAN.MATOS II EL 69 kV SAN.MATOS II  MIGUEL ANGICOS DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2043 298,523.64
  SAN.MATOS II EL 69 kV SAN.MATOS II  JUCURUTU DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2043 298,523.64
  SAN.MATOS II MC 69 kV TR 138/69 kV SAN.MATOS II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2042 317,897.14
  SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 338,573.52
  SAN.MATOS II IB 138 kV MG 138 kV SAN.MATOS II MG1 RN IB1 DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2041 361,180.78

 

121 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 467,361.62
  SAN.MATOS II MC 138 kV TR 138/69 kV SAN.MATOS II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2040 472,549.44
  SAN.MATOS II MC 138 kV TR 138/69 kV SAN.MATOS II TR1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2040 472,549.44
  SAN.MATOS II EL 138 kV SAN.MATOS II LT 138 kV SAN.MATOS II /CUR.NOVOS II C-1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2041 691,319.16
  SAN.MATOS II EL 138 kV SAN.MATOS II LT 138 kV ACU II /SAN.MATOS II C-1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2041 691,319.16
  SAN.MATOS II TR 138/69 kV SAN.MATOS II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2053 791,457.72
  SAN.MATOS II TR 138/69 kV SAN.MATOS II TR1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2053 791,457.72
  SAN.MATOS II MG 138 kV SAN.MATOS II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 18/12/2019 18/12/2044 981,403.49
  SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RMEL REN 643/2014 21/05/2013 20/05/2030 15,383.01
  SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RMEL REN 643/2014 30/09/2013 29/09/2030 25,867.42
  SANTA CRUZ II TR 69/13,8 kV SANTA CRUZ II TR2A RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  SANTA CRUZ II MC 13,8 kV TR 69/13,8 kV SANTA CRUZ II TR2A RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  SANTA CRUZ II EL 13,8 kV SANTA CRUZ II  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  SANTA CRUZ II EL 13,8 kV SANTA CRUZ II  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  SANTA CRUZ II MC 69 kV TR 69/13,8 kV SANTA CRUZ II TR2A RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  SANTA CRUZ II MC 69 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  SANTA CRUZ II MC 138 kV RTB 138 kV 10 Mvar SANTA CRUZ II RT1 RN DIT   061/2001 IPCA RCDM REA 1814/2009 10/12/2012 9/12/2045 71,659.60
  SANTA CRUZ II MC 13,8 kV TR 69/13,8 kV SANTA CRUZ II TR2B RN DIT   061/2001 IPCA RCDM REA 4576/2014 20/09/2019 20/09/2039 76,921.11
  SANTA CRUZ II TT 69/13,8 kV SANTA CRUZ II TA1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  SANTA CRUZ II MC 69 kV TR 69/13,8 kV SANTA CRUZ II TR2B RN DIT   061/2001 IPCA RCDM REA 4576/2014 20/09/2019 20/09/2042 101,107.76
  SANTA CRUZ II MC 138 kV RTB 138 kV 10 Mvar SANTA CRUZ II RT1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 106,421.42
  SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 107,116.92
  SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2050 144,627.73
  SANTA CRUZ II TR 69/13,8 kV SANTA CRUZ II TR2C RN DIT   061/2001 IPCA RCDM REA 4576/2014 20/09/2019 20/09/2054 146,341.32
  SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 147,862.53
  SANTA CRUZ II RTB 138 kV 10 Mvar SANTA CRUZ II RT1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 149,497.60
  SANTA CRUZ II IB 69 kV MG 138 kV SANTA CRUZ II MG1 RN IB1 DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2047 166,269.59
  SANTA CRUZ II TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,510.17
  SANTA CRUZ II MC 69 kV TR 138/69 kV SANTA CRUZ II TR3 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2042 208,841.56
  SANTA CRUZ II MC 69 kV TR 138/69 kV SANTA CRUZ II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2042 257,798.72
  SANTA CRUZ II MC 69 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 20/09/2019 20/09/2042 257,798.72
  SANTA CRUZ II EL 69 kV SANTA CRUZ II  TANGARA DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2043 298,523.64
  SANTA CRUZ II EL 69 kV SANTA CRUZ II  CUITE DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2043 298,523.64
  SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 324,347.21
  SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2050 331,035.23
  SANTA CRUZ II IB 138 kV MG 138 kV SANTA CRUZ II MG1 RN IB1 DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2041 361,180.78
  SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 376,565.35
  SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR3 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2040 472,549.44
  SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2040 472,549.44
  SANTA CRUZ II MC 138 kV TR 138/69 kV SANTA CRUZ II TR1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 20/09/2019 20/09/2040 472,549.44
  SANTA CRUZ II EL 138 kV SANTA CRUZ II LT 138 kV PARAISO /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2041 691,319.16
  SANTA CRUZ II EL 138 kV SANTA CRUZ II LT 138 kV CUR.NOVOS II /SANTA CRUZ II C-1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2041 691,319.16
  SANTA CRUZ II EL 138 kV SANTA CRUZ II LT 138 kV C.GRANDE II /SANTA CRUZ II C-1 PB/RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2041 691,319.16
  SANTA CRUZ II TR 138/69 kV SANTA CRUZ II TR3 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2053 791,457.72
  SANTA CRUZ II TR 138/69 kV SANTA CRUZ II TR2 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2053 791,457.72
  SANTA CRUZ II MG 138 kV SANTA CRUZ II MG1 RN DIT   061/2001 IPCA RCDM REA 4576/2014 28/01/2019 28/01/2050 980,723.62
  SANTA RITA II MG 230 kV SANTA RITA II MG1 PB RB FT MG 230 kV SANTA RITA II MG1 PB 017/2009 IPCA RMEL REN 643/2014 28/02/2015 27/02/2030 62,714.19
  SANTA RITA II TT 69/0 kV SANTA RITA II TT1 PB DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 73,672.00
  SANTA RITA II MC 69 kV TT 69/0 kV SANTA RITA II TT1 PB DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 84,502.50
  SANTA RITA II MG 230 kV SANTA RITA II MG1 PB RB FT MG 230 kV SANTA RITA II MG1 PB 017/2009 IPCA RBNI REA 4347/2013 8/5/2017 7/5/2049 103,729.18
  SANTA RITA II IB 69 kV MG 230 kV SANTA RITA II MG1 PB IB1 DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 111,731.41
  SANTA RITA II MG 230 kV SANTA RITA II MG1 PB RB FT MG 230 kV SANTA RITA II MG1 PB 017/2009 IPCA RBNI REA 3892/2013 22/02/2016 22/02/2050 136,476.25
  SANTA RITA II EL 230 kV SANTA RITA II LT 230 kV SANTA RITA II /MUSSURE II C-1 PB RB FT LT 230 kV SANTA RITA II /MUSSURE II C-1 PB 061/2001 IPCA RBNI REA 10199/2021 17/05/2021 17/05/2049 147,475.09
  SANTA RITA II EL 230 kV SANTA RITA II LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB RB FT LT 230 kV GOIANINHA /SANTA RITA II C-1 PE/PB 061/2001 IPCA RBNI REA 10199/2021 17/05/2021 17/05/2049 147,475.09
  SANTA RITA II MC 69 kV TR 230/69 kV SANTA RITA II TR2 PB RBF FT TR 230/69 kV SANTA RITA II TR2 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 3/8/2039 154,230.47
  SANTA RITA II MC 69 kV TR 230/69 kV SANTA RITA II TR1 PB RBF FT TR 230/69 kV SANTA RITA II TR1 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 3/8/2039 154,230.47
  SANTA RITA II MC 69 kV BC 69 kV 21 Mvar SANTA RITA II BC2 PB DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 155,070.98
  SANTA RITA II MC 69 kV BC 69 kV 21 Mvar SANTA RITA II BC1 PB DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 155,070.98
  SANTA RITA II EL 69 kV SANTA RITA II  DIST4 DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 168,275.80
  SANTA RITA II EL 69 kV SANTA RITA II  DIST3 DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 168,275.80
  SANTA RITA II EL 69 kV SANTA RITA II  DIST2 DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 168,275.80
  SANTA RITA II EL 69 kV SANTA RITA II  DIST1 DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 168,275.80
  SANTA RITA II TT 69/0 kV SANTA RITA II TT2 PB DIT   017/2009 IPCA RCDM REA 4347/2013 8/5/2017 7/5/2047 180,654.03
  SANTA RITA II BC 69 kV 21 Mvar SANTA RITA II BC2 PB DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 285,632.21
  SANTA RITA II BC 69 kV 21 Mvar SANTA RITA II BC1 PB DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 285,632.21
  SANTA RITA II MC 69 kV TR 230/69 kV SANTA RITA II TR3 PB RBF FT TR 230/69 kV SANTA RITA II TR3 PB 017/2009 IPCA RBNI REA 3892/2013 22/02/2016 22/02/2039 318,443.30
  SANTA RITA II IB 230 kV MG 230 kV SANTA RITA II MG1 PB IB1 RB FT MG 230 kV SANTA RITA II MG1 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 3/8/2039 346,539.28
  SANTA RITA II MC 230 kV TR 230/69 kV SANTA RITA II TR2 PB RBF FT TR 230/69 kV SANTA RITA II TR2 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 3/8/2039 426,984.65
  SANTA RITA II MC 230 kV TR 230/69 kV SANTA RITA II TR1 PB RBF FT TR 230/69 kV SANTA RITA II TR1 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 3/8/2039 426,984.65
  SANTA RITA II EL 230 kV SANTA RITA II LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB RB FT LT 230 kV PAU FERRO /SANTA RITA II C-1 PE/PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 3/8/2039 705,250.78
  SANTA RITA II MC 230 kV TR 230/69 kV SANTA RITA II TR3 PB RBF FT TR 230/69 kV SANTA RITA II TR3 PB 017/2009 IPCA RBNI REA 3892/2013 22/02/2016 22/02/2040 806,896.99
  SANTA RITA II MG 230 kV SANTA RITA II MG1 PB RB FT MG 230 kV SANTA RITA II MG1 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 3/8/2039 1,040,621.12
  SANTA RITA II TR 230/69 kV SANTA RITA II TR3 PB RBF FT TR 230/69 kV SANTA RITA II TR3 PB 017/2009 IPCA RBNI REA 3892/2013 22/02/2016 22/02/2051 1,106,951.24
  SANTA RITA II TR 230/69 kV SANTA RITA II TR2 PB RBF FT TR 230/69 kV SANTA RITA II TR2 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 3/8/2039 1,612,992.96
  SANTA RITA II TR 230/69 kV SANTA RITA II TR1 PB RBF FT TR 230/69 kV SANTA RITA II TR1 PB 017/2009 IPCA RBL CC 017/2009 21/08/2012 3/8/2039 1,612,992.96
  SANTANA II MG 230 kV SANTANA II MG2 AL RB FT MG 230 kV SANTANA II MG2 AL 061/2001 IPCA RBNI DSP 1019/2022 1/7/2022 30/06/2053 38,732.30
  SANTANA II EL 230 kV SANTANA II LT 230 kV SANTANA II /ANGELIM C-1 AL/PE RB FT LT 230 kV SANTANA II /ANGELIM C-1 AL/PE 061/2001 IPCA RBNI DSP 1019/2022 1/7/2022 30/06/2051 197,000.02
  SANTANA II EL 230 kV SANTANA II LT 230 kV P.AFONSO III /SANTANA II C-1 AL RB FT LT 230 kV P.AFONSO III /SANTANA II C-1 AL 061/2001 IPCA RBNI DSP 1019/2022 1/7/2022 30/06/2051 197,000.02
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA 004/2010 IPCA RBL CC 004/2010 12/7/2010 12/7/2040 545,464.75
  SAO LUIS III EL 230 kV SAO LUIS III LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-2 MA 004/2010 IPCA RBL CC 004/2010 12/7/2010 12/7/2040 545,464.75
  SAPEACU MG 500 kV SAPEACU MG5 BA RB FT MG 500 kV SAPEACU MG5 BA 061/2001 IPCA RMEL REN 643/2014 20/12/2013 19/12/2047 39,481.61
  SAPEACU EL 230 kV SAPEACU LT 230 kV SAPEACU /STO.A.JESUS C-2 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  SAPEACU EL 230 kV SAPEACU LT 230 kV SAPEACU /STO.A.JESUS C-1 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  SAPEACU EL 230 kV SAPEACU LT 230 kV SAPEACU /FUNIL C-1 BA RB FT LT 230 kV SAPEACU /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  SAPEACU EL 230 kV SAPEACU LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  SAPEACU EL 230 kV SAPEACU LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99

 

122 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  SAPEACU EL 230 kV SAPEACU LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA RB FT LT 230 kV G.MANGABEIRA /SAPEACU C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  SOBRAL II EL 69 kV SOBRAL II  DIST4 DIT   061/2001 IPCA RMEL REN 443/2011 7/8/2016 6/8/2039 4,693.90
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2045 6,980.78
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2045 6,980.78
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2045 6,980.78
  SOBRAL II MC 69 kV TT 69/13,8 kV SOBRAL II TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  SOBRAL II BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  SOBRAL II BC 13,8 kV 3,6 MVAr SOBRAL II BC4 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  SOBRAL II BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  SOBRAL II IB 69 kV MG 230 kV SOBRAL II MG1 CE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  SOBRAL II EL 230 kV SOBRAL II LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RMEL REN 643/2014 16/03/2014 15/03/2042 46,273.06
  SOBRAL II MC 13,8 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  SOBRAL II MC 13,8 kV TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  SOBRAL II BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE 061/2001 IPCA RMEL REN 643/2014 3/10/2014 2/10/2028 51,272.72
  SOBRAL II RTL 230 kV 3,33 Mvar SOBRAL II RTR1 CE RB FT RTL 230 kV 3,33 Mvar SOBRAL II RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,763.78
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR3 CE RBF FT TR 230/69 kV SOBRAL II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC2 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  SOBRAL II MC 13,8 kV BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC5 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  SOBRAL II MC 13,8 kV BC 13,8 kV 3,6 MVAr SOBRAL II BC4 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC4 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  SOBRAL II MC 13,8 kV BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  SOBRAL II EL 69 kV SOBRAL II  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  SOBRAL II EL 69 kV SOBRAL II  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  SOBRAL II EL 69 kV SOBRAL II  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  SOBRAL II EL 69 kV SOBRAL II  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  SOBRAL II EL 69 kV SOBRAL II  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  SOBRAL II EL 69 kV SOBRAL II  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  SOBRAL II EL 69 kV SOBRAL II  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  SOBRAL II EL 69 kV SOBRAL II  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  SOBRAL II TT 69/13,8 kV SOBRAL II TA1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  SOBRAL II MC 230 kV RTL 230 kV 10 Mvar SOBRAL II RT2 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  SOBRAL II MC 230 kV RTL 230 kV 10 MVAr SOBRAL II RT1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  SOBRAL II BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE RBF FT BC 13,8 kV 3,6 MVAr SOBRAL II BC3 CE 061/2001 IPCA RMEL REN 643/2014 3/10/2014 2/10/2028 102,545.40
  SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC2 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC1 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  SOBRAL II EL 69 kV SOBRAL II  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  SOBRAL II EL 69 kV SOBRAL II  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  SOBRAL II EL 69 kV SOBRAL II  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  SOBRAL II EL 69 kV SOBRAL II  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  SOBRAL II EL 69 kV SOBRAL II  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  SOBRAL II IB 230 kV MG 230 kV SOBRAL II MG1 CE IB1 RB FT MG 230 kV SOBRAL II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  SOBRAL II BC 69 kV 24,4 Mvar SOBRAL II BC2 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 126,400.27
  SOBRAL II BC 69 kV 24,4 Mvar SOBRAL II BC1 CE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 126,400.27
  SOBRAL II TT 69/13,8 kV SOBRAL II TA1 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  SOBRAL II MC 230 kV TR 230/69 kV SOBRAL II TR3 CE RBF FT TR 230/69 kV SOBRAL II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  SOBRAL II MC 230 kV TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  SOBRAL II MC 230 kV TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  SOBRAL II RTL 230 kV 10 Mvar SOBRAL II RT2 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  SOBRAL II RTL 230 kV 10 MVAr SOBRAL II RT1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  SOBRAL II MC 230 kV TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  SOBRAL II EL 230 kV SOBRAL II LT 230 kV SOBRAL II /SOBRAL III C-2 CE RB FT LT 230 kV SOBRAL II /SOBRAL III C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  SOBRAL II EL 230 kV SOBRAL II LT 230 kV SOBRAL II /SOBRAL III C-1 CE RB FT LT 230 kV SOBRAL II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  SOBRAL II EL 230 kV SOBRAL II LT 230 kV IBIAPINA II /SOBRAL II C-1 CE RB FT LT 230 kV IBIAPINA II /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  SOBRAL II EL 230 kV SOBRAL II LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC2 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  SOBRAL II MC 69 kV BC 69 kV 24,4 Mvar SOBRAL II BC1 CE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  SOBRAL II EL 69 kV SOBRAL II  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  SOBRAL II EL 69 kV SOBRAL II  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  SOBRAL II EL 69 kV SOBRAL II  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  SOBRAL II EL 69 kV SOBRAL II  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  SOBRAL II TT 69/13,8 kV SOBRAL II TA2 CE DIT   061/2001 IPCA RCDM REA 2412/2010 27/06/2012 26/06/2042 275,586.30
  SOBRAL II MC 69 kV TT 69/13,8 kV SOBRAL II TA2 CE DIT   061/2001 IPCA RCDM REA 2412/2010 27/06/2012 26/06/2043 296,796.69
  SOBRAL II TR 230/69 kV SOBRAL II TR3 CE RBF FT TR 230/69 kV SOBRAL II TR3 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  SOBRAL II TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  SOBRAL II TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  SOBRAL II MC 69 kV TR 230/69 kV SOBRAL II TR4 CE RBF FT TR 230/69 kV SOBRAL II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 31/03/2014 30/03/2044 422,296.68
  SOBRAL II TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  SOBRAL II TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  SOBRAL II MG 230 kV SOBRAL II MG1 CE RB FT MG 230 kV SOBRAL II MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 603,770.08
  SOBRAL II EL 230 kV SOBRAL II LT 230 kV CAUIPE /SOBRAL II C-1 CE RB FT LT 230 kV CAUIPE /SOBRAL II C-1 CE 061/2001 IPCA RBNI REA 2460/2010 21/11/2013 20/11/2044 754,232.44
  SOBRAL II MG 230 kV SOBRAL II MG1 CE RB FT MG 230 kV SOBRAL II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 833,434.82
  SOBRAL II MC 230 kV TR 230/69 kV SOBRAL II TR4 CE RBF FT TR 230/69 kV SOBRAL II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 31/03/2014 30/03/2044 1,083,447.44
  SOBRAL II TR 230/69 kV SOBRAL II TR2 CE RBF FT TR 230/69 kV SOBRAL II TR2 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  SOBRAL II TR 230/69 kV SOBRAL II TR1 CE RBF FT TR 230/69 kV SOBRAL II TR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  SOBRAL II TR 230/69 kV SOBRAL II TR4 CE RBF FT TR 230/69 kV SOBRAL II TR4 CE 061/2001 IPCA RBNI REA 2460/2010 31/03/2014 30/03/2048 1,409,406.53
  SOBRAL II MG 230 kV SOBRAL II MG1 CE RB FT MG 230 kV SOBRAL II MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,828,199.86
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RMEL REN 643/2014 5/3/2013 4/3/2043 16,274.77
  SOBRAL III MG 500 kV SOBRAL III MG1 CE RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RMEL REN 643/2014 30/01/2014 29/01/2031 25,823.92
  SOBRAL III MG 500 kV SOBRAL III MG1 CE RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RMEL REN 643/2014 1/8/2014 31/07/2031 28,638.12
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RMEL REN 643/2014 26/01/2014 25/01/2049 31,145.17
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046 35,468.74
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RMEL REN 643/2014 27/01/2014 26/01/2049 41,529.72
  SOBRAL III MC 500 kV RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046 53,203.12

 

123 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  SOBRAL III MC 500 kV RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046 53,203.12
  SOBRAL III IB 500 kV MG 500 kV SOBRAL III MG1 CE IB1 RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046 53,203.12
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046 53,203.12
  SOBRAL III IB 230 kV MG 500 kV SOBRAL III MG1 CE IB1 RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  SOBRAL III MC 230 kV TR 500/230 kV SOBRAL III TR1 CE RB FT TR 500/230 kV SOBRAL III TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  SOBRAL III EL 230 kV SOBRAL III LT 230 kV SOBRAL II /SOBRAL III C-2 CE RB FT LT 230 kV SOBRAL II /SOBRAL III C-2 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  SOBRAL III EL 230 kV SOBRAL III LT 230 kV SOBRAL II /SOBRAL III C-1 CE RB FT LT 230 kV SOBRAL II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  SOBRAL III MC 500 kV RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  SOBRAL III MC 500 kV RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  SOBRAL III RTL 500 kV 60 Mvar SOBRAL III RTR1 CE RB FT RTL 500 kV 60 Mvar SOBRAL III RTR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,025.77
  SOBRAL III RTL 500 kV 60 Mvar SOBRAL III RTR1 CE RB FT RTL 500 kV 60 Mvar SOBRAL III RTR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 392,064.76
  SOBRAL III MC 500 kV TR 500/230 kV SOBRAL III TR1 CE RB FT TR 500/230 kV SOBRAL III TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  SOBRAL III IB 500 kV MG 500 kV SOBRAL III MG1 CE IB1 RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  SOBRAL III EL 230 kV SOBRAL III LT 230 kV SOBRAL III /ACARAU II C-1 CE RB FT LT 230 kV SOBRAL III /ACARAU II C-1 CE 021/2010 IPCA RBL CC 021/2010 8/4/2014 23/11/2040 470,591.76
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  SOBRAL III IB 500 kV MG 500 kV SOBRAL III MG1 CE IB1 RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 802,051.67
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 802,051.67
  SOBRAL III RTL 500 kV 60 Mvar SOBRAL III RTR1 CE RB FT RTL 500 kV 60 Mvar SOBRAL III RTR1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 860,022.55
  SOBRAL III MC 230 kV TR 500/230 kV SOBRAL III TR2 CE RB FT TR 500/230 kV SOBRAL III TR2 CE 061/2001 IPCA RBNI REA 2181/2009 21/09/2012 20/09/2042 1,090,602.54
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,107,139.65
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,107,139.65
  SOBRAL III MG 500 kV SOBRAL III MG1 CE RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,117,894.16
  SOBRAL III IB 500 kV MG 500 kV SOBRAL III MG1 CE IB1 RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,480,048.26
  SOBRAL III EL 500 kV SOBRAL III LT 500 kV SOBRAL III /PECEM II C-1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,480,048.26
  SOBRAL III MG 500 kV SOBRAL III MG1 CE RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,543,123.70
  SOBRAL III MC 500 kV TR 500/230 kV SOBRAL III TR2 CE RB FT TR 500/230 kV SOBRAL III TR2 CE 061/2001 IPCA RBNI REA 2181/2009 21/09/2012 20/09/2043 1,770,522.44
  SOBRAL III TR 500/230 kV SOBRAL III TR1 CE RB FT TR 500/230 kV SOBRAL III TR1 CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,943,538.87
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT2 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,428,591.30
  SOBRAL III RTL 500 kV 148 MVAr SOBRAL III RT1 CE RB FT LT 500 kV SOBRAL III /PECEM II C-1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,428,591.30
  SOBRAL III MG 500 kV SOBRAL III MG1 CE RB FT MG 500 kV SOBRAL III MG1 CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,384,954.01
  SOBRAL III TR 500/230 kV SOBRAL III TR2 CE RB FT TR 500/230 kV SOBRAL III TR2 CE 061/2001 IPCA RBNI REA 2181/2009 21/09/2012 20/09/2047 5,007,682.93
  SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA RB FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA 061/2001 IPCA RMEL REN 443/2011 23/08/2015 22/08/2045 13,680.54
  SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 9/6/2016 8/6/2044 27,804.13
  SR.BONFIM II MG 230 kV SR.BONFIM II MG1 BA RB FT MG 230 kV SR.BONFIM II MG1 BA 061/2001 IPCA RBNI REA 6059/2016 29/07/2018 29/07/2049 37,135.70
  SR.BONFIM II IB 69 kV MG 230 kV SR.BONFIM II MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  SR.BONFIM II MC 69 kV TR 230/69 kV SR.BONFIM II TR3 BA RBF FT TR 230/69 kV SR.BONFIM II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  SR.BONFIM II MC 69 kV TR 230/69 kV SR.BONFIM II TR1 BA RBF FT TR 230/69 kV SR.BONFIM II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  SR.BONFIM II EL 69 kV SR.BONFIM II  JACOB-PEDRINHAS DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  SR.BONFIM II EL 69 kV SR.BONFIM II  JACOBINA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  SR.BONFIM II EL 69 kV SR.BONFIM II  ITIUBA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  SR.BONFIM II EL 69 kV SR.BONFIM II  CIA CIMENT BRA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  SR.BONFIM II EL 69 kV SR.BONFIM II  BONFIM DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  SR.BONFIM II IB 138 kV MG 230 kV SR.BONFIM II MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,365.85
  SR.BONFIM II TT 69/13,8 kV SR.BONFIM II TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  SR.BONFIM II TT 69/0 kV SR.BONFIM II TA2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 2173/2009 27/09/2012 26/09/2038 111,017.16
  SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 9/6/2016 8/6/2031 115,664.98
  SR.BONFIM II MC 138 kV TR 230/138 kV SR.BONFIM II TR4 BA RBF FT TR 230/138 kV SR.BONFIM II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,964.04
  SR.BONFIM II MG 230 kV SR.BONFIM II MG1 BA RB FT MG 230 kV SR.BONFIM II MG1 BA 061/2001 IPCA RBNI REA 2837/2011 15/12/2015 14/12/2043 129,016.40
  SR.BONFIM II IB 230 kV MG 230 kV SR.BONFIM II MG1 BA IB1 RB FT MG 230 kV SR.BONFIM II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  SR.BONFIM II MC 230 kV TR 230/69 kV SR.BONFIM II TR3 BA RBF FT TR 230/69 kV SR.BONFIM II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  SR.BONFIM II MC 230 kV TR 230/69 kV SR.BONFIM II TR1 BA RBF FT TR 230/69 kV SR.BONFIM II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  SR.BONFIM II MC 230 kV TR 230/138 kV SR.BONFIM II TR4 BA RBF FT TR 230/138 kV SR.BONFIM II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  SR.BONFIM II MC 230 kV TR 230/138 kV SR.BONFIM II TR3 BA RBF FT TR 230/69 kV SR.BONFIM II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  SR.BONFIM II EL 138 kV SR.BONFIM II  JACOBINA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 174,404.43
  SR.BONFIM II RTS 69 kV 40 MVAr SR.BONFIM II RT2 BA RBF FT TR 230/69 kV SR.BONFIM II TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 187,504.77
  SR.BONFIM II RTS 69 kV 40 MVAr SR.BONFIM II RT1 BA RBF FT TR 230/69 kV SR.BONFIM II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 187,504.77
  SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA RB FT LT 230 kV SR.BONFIM II /CAMPO FORMOSO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA RB FT LT 230 kV JUAZEIRO II /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  SR.BONFIM II EL 230 kV SR.BONFIM II LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA RB FT LT 230 kV JAGUARARI-SE /SR.BONFIM II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  SR.BONFIM II TR 230/69 kV SR.BONFIM II TR3 BA RBF FT TR 230/69 kV SR.BONFIM II TR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  SR.BONFIM II TR 230/69 kV SR.BONFIM II TR1 BA RBF FT TR 230/69 kV SR.BONFIM II TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  SR.BONFIM II TR 230/138 kV SR.BONFIM II TR4 BA RBF FT TR 230/138 kV SR.BONFIM II TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,942.44
  SR.BONFIM II MG 230 kV SR.BONFIM II MG1 BA RB FT MG 230 kV SR.BONFIM II MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 640,919.60
  SR.BONFIM II MC 230 kV TR 230/138 kV SR.BONFIM II TR3 BA RBF FT TR 230/69 kV SR.BONFIM II TR2 BA 061/2001 IPCA RBNI REA 6059/2016 29/07/2018 29/07/2042 651,343.65
  SR.BONFIM II MC 138 kV TR 230/138 kV SR.BONFIM II TR6 BA RBF FT TR 230/138 kV SR.BONFIM II TR6 BA 061/2001 IPCA RBNI REA 3208/2011 23/11/2015 22/11/2045 912,192.14
  SR.BONFIM II EL 138 kV SR.BONFIM II  QUEIMADAII-03S2 DIT   061/2001 IPCA RCDM REA 2837/2011 15/12/2015 14/12/2045 959,082.56
  SR.BONFIM II MC 230 kV TR 230/138 kV SR.BONFIM II TR6 BA RBF FT TR 230/138 kV SR.BONFIM II TR6 BA 061/2001 IPCA RBNI REA 3208/2011 23/11/2015 22/11/2046 1,279,789.95
  SR.BONFIM II TR 230/138 kV SR.BONFIM II TR6 BA RBF FT TR 230/138 kV SR.BONFIM II TR6 BA 061/2001 IPCA RBNI REA 3208/2011 23/11/2015 22/11/2049 1,469,749.87
  SR.BONFIM II MC 138 kV TR 230/138 kV SR.BONFIM II TR3 BA RBF FT TR 230/138 kV SR.BONFIM II TR3 BA 061/2001 IPCA RBNI REA 6059/2016 29/07/2018 29/07/2039 1,508,084.18
  SR.BONFIM II TR 230/138 kV SR.BONFIM II TR3 BA RBF FT TR 230/138 kV SR.BONFIM II TR3 BA 061/2001 IPCA RBNI REA 6059/2016 29/07/2018 29/07/2052 1,520,025.83
  STO.A.JESUS MG 230 kV STO.A.JESUS MG1 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RMEL REN 643/2014 7/2/2014 6/2/2048 6,394.81
  STO.A.JESUS MC 69 kV TT 69/13,8 kV STO.A.JESUS TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  STO.A.JESUS TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  STO.A.JESUS TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  STO.A.JESUS IB 69 kV MG 230 kV STO.A.JESUS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  STO.A.JESUS MG 230 kV STO.A.JESUS MG1 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035 58,790.46
  STO.A.JESUS IB 69 kV MG 230 kV STO.A.JESUS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  STO.A.JESUS MC 69 kV TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  STO.A.JESUS MC 69 kV TR 230/69 kV STO.A.JESUS TR2 BA RBF FT TR 230/69 kV STO.A.JESUS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20

 

124 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  STO.A.JESUS MC 69 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  STO.A.JESUS TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  STO.A.JESUS MC 69 kV TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  STO.A.JESUS MC 69 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  STO.A.JESUS TT 69/13,8 kV STO.A.JESUS TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2031 115,676.92
  STO.A.JESUS IB 230 kV MG 230 kV STO.A.JESUS MG1 BA IB1 RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,560.75
  STO.A.JESUS TT 69/13,8 kV STO.A.JESUS TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  STO.A.JESUS IB 69 kV MG 230 kV STO.A.JESUS MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  STO.A.JESUS MC 230 kV TR 230/69 kV STO.A.JESUS TR2 BA RBF FT TR 230/69 kV STO.A.JESUS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  STO.A.JESUS MC 230 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 152,331.14
  STO.A.JESUS IB 230 kV MG 230 kV STO.A.JESUS MG1 BA IB1 RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 166,420.18
  STO.A.JESUS MC 69 kV TR 69/13,8 kV STO.A.JESUS TR5 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  STO.A.JESUS MC 69 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  STO.A.JESUS MC 230 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,275.54
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-2 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV SAPEACU /STO.A.JESUS C-2 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV SAPEACU /STO.A.JESUS C-1 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  STO.A.JESUS EL 69 kV STO.A.JESUS  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  STO.A.JESUS TT 69/13,8 kV STO.A.JESUS TA1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV SAPEACU /STO.A.JESUS C-1 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  STO.A.JESUS IB 230 kV MG 230 kV STO.A.JESUS MG1 BA IB1 RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 365,054.76
  STO.A.JESUS TR 230/69 kV STO.A.JESUS TR2 BA RBF FT TR 230/69 kV STO.A.JESUS TR2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  STO.A.JESUS TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  STO.A.JESUS MC 69 kV TR 230/69 kV STO.A.JESUS TR3 BA RBF FT TR 230/69 kV STO.A.JESUS TR3 BA 061/2001 IPCA RBNI REA 3208/2011 9/11/2015 8/11/2045 439,205.68
  STO.A.JESUS MC 230 kV TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 461,254.68
  STO.A.JESUS TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  STO.A.JESUS MG 230 kV STO.A.JESUS MG1 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 550,861.11
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV STO.A.JESUS /FUNIL C-1 BA RB FT LT 230 kV STO.A.JESUS /FUNIL C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  STO.A.JESUS EL 230 kV STO.A.JESUS LT 230 kV SAPEACU /STO.A.JESUS C-1 BA RB FT LT 230 kV SAPEACU /STO.A.JESUS C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 670,350.60
  STO.A.JESUS MG 230 kV STO.A.JESUS MG1 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 760,400.10
  STO.A.JESUS TR 230/69 kV STO.A.JESUS TR1 BA RBF FT TR 230/69 kV STO.A.JESUS TR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  STO.A.JESUS MC 230 kV TR 230/69 kV STO.A.JESUS TR3 BA RBF FT TR 230/69 kV STO.A.JESUS TR3 BA 061/2001 IPCA RBNI REA 3208/2011 9/11/2015 8/11/2045 1,126,697.26
  STO.A.JESUS TR 230/69 kV STO.A.JESUS TR3 BA RBF FT TR 230/69 kV STO.A.JESUS TR3 BA 061/2001 IPCA RBNI REA 3208/2011 9/11/2015 8/11/2049 1,460,192.03
  STO.A.JESUS MG 230 kV STO.A.JESUS MG1 BA RB FT MG 230 kV STO.A.JESUS MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,667,992.89
  SUAPE II MG 500 kV SUAPE II MG1 PE RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RMEL REN 643/2014 27/03/2015 26/03/2030 48,743.04
  SUAPE II MG 500 kV SUAPE II MG1 PE RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBNI REA 3237/2011 23/02/2015 23/02/2049 49,647.24
  SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /SUAPE III C-2 PE RB FT LT 230 kV SUAPE II /SUAPE III C-2 PE 006/2009 IPCA RBNI REA 5861/2016 10/12/2018 9/12/2033 51,825.22
  SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /SUAPE III C-1 PE RB FT LT 230 kV SUAPE II /SUAPE III C-1 PE 006/2009 IPCA RBNI REA 5861/2016 10/12/2018 9/12/2033 51,825.22
  SUAPE II MG 500 kV SUAPE II MG1 PE RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBNI REN 443/2011 7/7/2015 6/7/2046 115,542.90
  SUAPE II MG 500 kV SUAPE II MG1 PE RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBNI REN 443/2011 7/7/2015 6/7/2046 115,542.90
  SUAPE II IB 230 kV MG 500 kV SUAPE II MG1 PE IB1 RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 146,215.66
  SUAPE II EL 500 kV SUAPE II LT 500 kV MESSIAS /SUAPE II C-1 AL/PE RB FT LT 500 kV MESSIAS /SUAPE II C-1 AL/PE 061/2001 IPCA RBNI REA 10229/2021 21/05/2021 21/05/2049 183,689.09
  SUAPE II EL 500 kV SUAPE II LT 500 kV SUAPE II /RECIFE II C-1 PE RB FT LT 500 kV SUAPE II /RECIFE II C-1 PE 061/2001 IPCA RBNI REA 10229/2021 21/05/2021 21/05/2049 184,015.06
  SUAPE II RTL 500 kV 33,33 Mvar SUAPE II RTR1 PE RB FT RTL 500 kV 33,33 Mvar SUAPE II RTR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 242,216.11
  SUAPE II IB 500 kV MG 500 kV SUAPE II MG1 PE IB2 RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 243,125.62
  SUAPE II IB 500 kV MG 500 kV SUAPE II MG1 PE IB1 RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 243,125.62
  SUAPE II MC 230 kV TR 500/230 kV SUAPE II TR1 PE RB FT TR 500/230 kV SUAPE II TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 264,430.52
  SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /SUAPE III C-2 PE RB FT LT 230 kV SUAPE II /SUAPE III C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 304,715.59
  SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /SUAPE III C-1 PE RB FT LT 230 kV SUAPE II /SUAPE III C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 304,715.59
  SUAPE II EL 230 kV SUAPE II LT 230 kV PIRAPAMA II /SUAPE II C-2 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 304,715.59
  SUAPE II EL 230 kV SUAPE II LT 230 kV PIRAPAMA II /SUAPE II C-1 PE RB FT LT 230 kV PIRAPAMA II /SUAPE II C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 304,715.59
  SUAPE II MC 230 kV TR 500/230 kV SUAPE II TR2 PE RB FT TR 500/230 kV SUAPE II TR2 PE 006/2009 IPCA RBNI REA 3237/2011 23/02/2015 23/02/2049 452,638.46
  SUAPE II MC 500 kV RTL 500 kV 100 Mvar SUAPE II RT1 PE RB FT RTL 500 kV 100 Mvar SUAPE II RT1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 560,309.75
  SUAPE II MC 500 kV TR 500/230 kV SUAPE II TR1 PE RB FT TR 500/230 kV SUAPE II TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 631,000.70
  SUAPE II TR 500/230 kV SUAPE II TRR1 PE RB FT TR 500/230 kV SUAPE II TRR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 656,278.84
  SUAPE II RTL 500 kV 100 Mvar SUAPE II RT1 PE RB FT RTL 500 kV 100 Mvar SUAPE II RT1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 726,650.29
  SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /RNEST PETROBRAS C-2 PE DIT   006/2009 IPCA RCDM REN 443/2011 7/7/2015 6/7/2043 798,889.75
  SUAPE II EL 230 kV SUAPE II LT 230 kV SUAPE II /RNEST PETROBRAS C-1 PE DIT   006/2009 IPCA RCDM REN 443/2011 7/7/2015 6/7/2043 798,889.75
  SUAPE II MC 500 kV TR 500/230 kV SUAPE II TR2 PE RB FT TR 500/230 kV SUAPE II TR2 PE 006/2009 IPCA RBNI REA 3237/2011 23/02/2015 23/02/2048 1,188,686.21
  SUAPE II TR 500/230 kV SUAPE II TR1 PE RB FT TR 500/230 kV SUAPE II TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 1,968,836.51
  SUAPE II MG 500 kV SUAPE II MG1 PE RB FT MG 500 kV SUAPE II MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 2,484,199.95
  SUAPE II TR 500/230 kV SUAPE II TR2 PE RB FT TR 500/230 kV SUAPE II TR2 PE 006/2009 IPCA RBNI REA 3237/2011 23/02/2015 23/02/2055 5,277,743.93
  SUAPE III IB 69 kV MG 230 kV SUAPE III MG1 PE IB1 DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039 11,135.85
  SUAPE III MG 230 kV SUAPE III MG1 PE RB FT MG 230 kV SUAPE III MG1 PE 006/2009 IPCA RBNI REA 3237/2011 18/05/2015 18/05/2047 13,097.78
  SUAPE III EL 69 kV SUAPE III  DIST4 DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039 23,408.50
  SUAPE III EL 69 kV SUAPE III  DIST3 DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039 23,408.50

 

125 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  SUAPE III EL 69 kV SUAPE III  DIST2 DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039 23,408.50
  SUAPE III EL 69 kV SUAPE III  DIST1 DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039 23,408.50
  SUAPE III MC 69 kV TR 230/69 kV SUAPE III TR2 PE RBF FT TR 230/69 kV SUAPE III TR2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 48,327.57
  SUAPE III MC 69 kV TR 230/69 kV SUAPE III TR1 PE RBF FT TR 230/69 kV SUAPE III TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 48,327.57
  SUAPE III MG 230 kV SUAPE III MG1 PE RB FT MG 230 kV SUAPE III MG1 PE 006/2009 IPCA RBNI REA 3237/2011 18/05/2015 18/05/2047 49,664.46
  SUAPE III TT 69/0 kV SUAPE III TA1 PE DIT   006/2009 IPCA RPEC CC 006/2009 28/01/2009 28/01/2039 67,405.95
  SUAPE III MG 230 kV SUAPE III MG1 PE RB FT MG 230 kV SUAPE III MG1 PE 006/2009 IPCA RBNI REA 4347/2013 30/10/2017 29/10/2049 144,965.05
  SUAPE III IB 230 kV MG 230 kV SUAPE III MG1 PE IB1 RB FT MG 230 kV SUAPE III MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 146,215.66
  SUAPE III MC 69 kV TR 230/69 kV SUAPE III TR3 PE RBF FT TR 230/69 kV SUAPE III TR3 PE 006/2009 IPCA RBNI REA 3237/2011 18/05/2015 18/05/2049 186,346.37
  SUAPE III MC 230 kV TR 230/69 kV SUAPE III TR2 PE RBF FT TR 230/69 kV SUAPE III TR2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 264,430.52
  SUAPE III MC 230 kV TR 230/69 kV SUAPE III TR1 PE RBF FT TR 230/69 kV SUAPE III TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 264,430.52
  SUAPE III EL 230 kV SUAPE III LT 230 kV SUAPE II /SUAPE III C-2 PE RB FT LT 230 kV SUAPE II /SUAPE III C-2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 304,715.59
  SUAPE III EL 230 kV SUAPE III LT 230 kV SUAPE II /SUAPE III C-1 PE RB FT LT 230 kV SUAPE II /SUAPE III C-1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 304,715.59
  SUAPE III TR 230/69 kV SUAPE III TR2 PE RBF FT TR 230/69 kV SUAPE III TR2 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 380,602.91
  SUAPE III TR 230/69 kV SUAPE III TR1 PE RBF FT TR 230/69 kV SUAPE III TR1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 380,602.91
  SUAPE III MC 230 kV TR 230/69 kV SUAPE III TR3 PE RBF FT TR 230/69 kV SUAPE III TR3 PE 006/2009 IPCA RBNI REA 3237/2011 18/05/2015 18/05/2049 452,854.32
  SUAPE III TT 69/0 kV SUAPE III TA2 PE DIT   006/2009 IPCA RCDM REA 4347/2013 30/10/2017 29/10/2047 478,210.88
  SUAPE III TR 230/69 kV SUAPE III TR3 PE RBF FT TR 230/69 kV SUAPE III TR3 PE 006/2009 IPCA RBNI REA 3237/2011 18/05/2015 18/05/2055 1,010,504.88
  SUAPE III MG 230 kV SUAPE III MG1 PE RB FT MG 230 kV SUAPE III MG1 PE 006/2009 IPCA RBL CC 006/2009 28/01/2009 28/01/2039 1,524,608.99
  TABOCAS BREJO VELHO MG 230 kV TABOCAS BREJO VELHO MG1 BA RB FT MG 230 kV TABOCAS BREJO VELHO MG1 BA 061/2001 IPCA RBNI REA 10198/2021 5/6/2019 4/6/2037 51,124.76
  TABOCAS BREJO VELHO MG 230 kV TABOCAS BREJO VELHO MG1 BA RB FT MG 230 kV TABOCAS BREJO VELHO MG1 BA 061/2001 IPCA RBNI REA 10198/2021 5/6/2019 4/6/2050 54,465.08
  TABOCAS BREJO VELHO IB 230 kV MG 230 kV TABOCAS BREJO VELHO MG1 BA IB1 RB FT MG 230 kV TABOCAS BREJO VELHO MG1 BA 061/2001 IPCA RBNI REA 10198/2021 5/6/2019 4/6/2048 104,196.36
  TABOCAS BREJO VELHO EL 230 kV TABOCAS BREJO VELHO LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA RB FT LT 230 kV TABOCAS BREJO VELHO /BARREIRAS II C-1 BA 061/2001 IPCA RBNI REA 10198/2021 5/6/2019 4/6/2047 147,475.09
  TABOCAS BREJO VELHO EL 230 kV TABOCAS BREJO VELHO LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA RB FT LT 230 kV B.JESUS LAPA /TABOCAS BREJO VELHO C-1 BA 061/2001 IPCA RBNI REA 10198/2021 19/06/2019 18/06/2047 147,475.09
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RMEL REN 443/2011 14/04/2016 13/04/2046 13,928.92
  TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBNI REA 5655/2016 14/10/2018 14/10/2049 18,210.93
  TACAIMBO MC 69 kV TT 69/13,8 kV TACAIMBO TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  TACAIMBO TR 69/13,8 kV TACAIMBO TR5 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  TACAIMBO EL 69 kV TACAIMBO  DIST3 DIT   061/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2046 36,188.54
  TACAIMBO TR 69/13,8 kV TACAIMBO TR5 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  TACAIMBO IB 69 kV MG 230 kV TACAIMBO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBNI REA 1814/2009 13/04/2015 12/4/2043 57,111.51
  TACAIMBO IB 69 kV MG 230 kV TACAIMBO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 60,537.54
  TACAIMBO MC 69 kV TR 69/13,8 kV TACAIMBO TR5 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  TACAIMBO MC 69 kV TR 230/69 kV TACAIMBO TR3 PE RBF FT TR 230/69 kV TACAIMBO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  TACAIMBO MC 69 kV TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  TACAIMBO MC 69 kV TR 230/69 kV TACAIMBO TR1 PE RBF FT TR 230/69 kV TACAIMBO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBNI REA 5655/2016 14/10/2018 14/10/2050 69,232.13
  TACAIMBO EL 69 kV TACAIMBO  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TACAIMBO EL 69 kV TACAIMBO  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TACAIMBO EL 69 kV TACAIMBO  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TACAIMBO EL 69 kV TACAIMBO  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RMEL REN 643/2014 30/10/2013 29/10/2041 79,575.29
  TACAIMBO TR 69/13,8 kV TACAIMBO TR5 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 85,874.69
  TACAIMBO MC 69 kV TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  TACAIMBO TT 69/13,8 kV TACAIMBO TA2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  TACAIMBO TT 69/13,8 kV TACAIMBO TA1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  TACAIMBO EL 69 kV TACAIMBO  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  TACAIMBO TT 69/13,8 kV TACAIMBO TA1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  TACAIMBO IB 69 kV MG 230 kV TACAIMBO MG1 PE IB1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 132,793.50
  TACAIMBO IB 230 kV MG 230 kV TACAIMBO MG1 PE IB1 RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  TACAIMBO MC 230 kV TR 230/69 kV TACAIMBO TR3 PE RBF FT TR 230/69 kV TACAIMBO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  TACAIMBO MC 230 kV TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  TACAIMBO MC 230 kV TR 230/69 kV TACAIMBO TR1 PE RBF FT TR 230/69 kV TACAIMBO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  TACAIMBO EL 69 kV TACAIMBO  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  TACAIMBO MC 230 kV TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  TACAIMBO MC 69 kV TR 230/69 kV TACAIMBO TR4 PE RBF FT TR 230/69 kV TACAIMBO TR4 PE 061/2001 IPCA RBNI REA 5655/2016 14/10/2018 14/10/2041 315,362.77
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-1 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  TACAIMBO TR 230/69 kV TACAIMBO TR3 PE RBF FT TR 230/69 kV TACAIMBO TR3 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  TACAIMBO TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  TACAIMBO TR 230/69 kV TACAIMBO TR1 PE RBF FT TR 230/69 kV TACAIMBO TR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  TACAIMBO EL 69 kV TACAIMBO  SAO CAETANO DIT   061/2001 IPCA RCDM REA 1814/2009 13/04/2015 12/4/2045 465,517.50
  TACAIMBO EL 69 kV TACAIMBO  BELO JARDIM C2 DIT   061/2001 IPCA RCDM REA 1814/2009 13/04/2015 12/4/2045 465,517.50
  TACAIMBO TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  TACAIMBO TR 230/69 kV TACAIMBO TR1 PE RBF FT TR 230/69 kV TACAIMBO TR1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 589,243.52
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB RB FT LT 230 kV TACAIMBO /C.GRANDE II C-2 PE/PB 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-3 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-3 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-2 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  TACAIMBO EL 230 kV TACAIMBO LT 230 kV ANGELIM /TACAIMBO C-1 PE RB FT LT 230 kV ANGELIM /TACAIMBO C-1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  TACAIMBO MC 230 kV TR 230/69 kV TACAIMBO TR4 PE RBF FT TR 230/69 kV TACAIMBO TR4 PE 061/2001 IPCA RBNI REA 5655/2016 14/10/2018 14/10/2042 740,332.76
  TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 813,382.59
  TACAIMBO TR 230/69 kV TACAIMBO TR2 PE RBF FT TR 230/69 kV TACAIMBO TR2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  TACAIMBO TR 230/69 kV TACAIMBO TR1 PE RBF FT TR 230/69 kV TACAIMBO TR1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  TACAIMBO TR 230/69 kV TACAIMBO TR4 PE RBF FT TR 230/69 kV TACAIMBO TR4 PE 061/2001 IPCA RBNI REA 5655/2016 14/10/2018 14/10/2052 1,597,071.60
  TACAIMBO MG 230 kV TACAIMBO MG1 PE RB FT MG 230 kV TACAIMBO MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,784,213.83
  TACARUTU MG 230 kV TACARUTU MG1 PE RB FT MG 230 kV TACARUTU MG1 PE 061/2001 IPCA RBNI REA 7026/2018 1/7/2018 14/12/2033 46,309.26

 

126 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  TACARUTU IB 230 kV MG 230 kV TACARUTU MG1 PE IB1 RB FT MG 230 kV TACARUTU MG1 PE 061/2001 IPCA RBNI REA 7026/2018 1/7/2018 14/12/2039 73,856.21
  TACARUTU EL 230 kV TACARUTU LT 230 kV TACARUTU /BOM NOME C-1 PE RB FT LT 230 kV TACARUTU /BOM NOME C-1 PE 061/2001 IPCA RBNI REA 7026/2018 1/7/2018 14/12/2038 121,848.74
  TACARUTU EL 230 kV TACARUTU LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE RB FT LT 230 kV P.AFONSO III /TACARUTU C-1 AL/PE 061/2001 IPCA RBNI REA 7026/2018 1/7/2018 14/12/2038 121,848.74
  TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RMEL REN 643/2014 6/2/2014 5/4/2046 9,588.78
  TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBNI REA 2376/2010 31/01/2013 31/01/2046 14,803.05
  TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RMEL REN 643/2014 25/06/2014 24/06/2046 18,088.33
  TAUA II IB 69 kV MG 230 kV TAUA II MG1 CE IB1 DIT   007/2005 IGPM RPEC CC 007/2005 4/3/2005 4/3/2035 92,056.34
  TAUA II MC 69 kV TR 230/69 kV TAUA II TR1 CE RBF FT TR 230/69 kV TAUA II TR1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 4/3/2035 172,679.43
  TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBNI REA 2823/2011 2/3/2015 2/3/2047 177,798.59
  TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBNI REA 3402/2012 15/12/2016 15/12/2049 179,196.45
  TAUA II TT 69/0 kV TAUA II TT1 CE DIT   007/2005 IGPM RPEC CC 007/2005 4/3/2005 4/3/2035 216,603.14
  TAUA II RTB 230 kV 15 Mvar TAUA II RT1 CE RB FT RTB 230 kV 15 Mvar TAUA II RT1 CE 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 232,806.05
  TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBNI REA 1179/2008 30/05/2010 30/05/2043 310,935.36
  TAUA II MC 230 kV RTB 230 kV 15 Mvar TAUA II RT1 CE RB FT RTB 230 kV 15 Mvar TAUA II RT1 CE 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 368,976.79
  TAUA II EL 69 kV TAUA II  DIST5 DIT   007/2005 IGPM RCDM REA 758/2006 27/11/2009 27/11/2040 418,367.49
  TAUA II MC 69 kV TR 230/69 kV TAUA II TR2 CE RBF FT TR 230/69 kV TAUA II TR2 CE 007/2005 IGPM RBNI REA 2823/2011 2/3/2015 2/3/2049 428,199.80
  TAUA II EL 69 kV TAUA II  DIST4 DIT   007/2005 IGPM RCDM REA 758/2006 9/3/2008 9/3/2038 475,558.10
  TAUA II EL 69 kV TAUA II  DIST3 DIT   007/2005 IGPM RCDM REA 758/2006 28/02/2008 28/02/2038 475,634.08
  TAUA II EL 69 kV TAUA II  DIST2 DIT   007/2005 IGPM RCDM REA 758/2006 27/02/2008 27/02/2038 475,641.67
  TAUA II EL 69 kV TAUA II  DIST1 DIT   007/2005 IGPM RCDM REA 758/2006 27/02/2008 27/02/2038 475,641.67
  TAUA II EL 230 kV TAUA II LT 230 kV PICOS /TAUA II C-1 PI/CE RB FT LT 230 kV PICOS /TAUA II C-1 PI/CE 012/2007 IPCA RBL CC 012/2007 14/06/2007 14/06/2037 488,228.47
  TAUA II IB 230 kV MG 230 kV TAUA II MG1 CE IB1 RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBNI REA 1179/2008 30/05/2010 30/05/2043 752,132.34
  TAUA II MC 230 kV TR 230/69 kV TAUA II TR1 CE RBF FT TR 230/69 kV TAUA II TR1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 4/3/2035 758,698.90
  TAUA II EL 230 kV TAUA II LT 230 kV MILAGRES /TAUA II C-1 CE RB FT LT 230 kV MILAGRES /TAUA II C-1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 4/3/2035 909,929.73
  TAUA II MG 230 kV TAUA II MG1 CE RB FT MG 230 kV TAUA II MG1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 4/3/2035 946,083.35
  TAUA II RTL 230 kV 15 Mvar TAUA II RT2 CE RB FT LT 230 kV MILAGRES /TAUA II C-1 CE 007/2005 IGPM RBNI REA 1179/2008 30/05/2010 30/05/2044 1,094,223.31
  TAUA II MC 230 kV TR 230/69 kV TAUA II TR2 CE RBF FT TR 230/69 kV TAUA II TR2 CE 007/2005 IGPM RBNI REA 2823/2011 2/3/2015 2/3/2049 1,155,210.17
  TAUA II MC 230 kV CE 90/-45 Mvar TAUA II CE1 CE RB FT CE 90/-45 Mvar TAUA II CE1 CE 007/2005 IGPM RBNI REA 3402/2012 15/12/2016 15/12/2049 1,169,378.83
  TAUA II TR 230/69 kV TAUA II TR1 CE RBF FT TR 230/69 kV TAUA II TR1 CE 007/2005 IGPM RBL CC 007/2005 28/12/2007 4/3/2035 1,213,482.00
  TAUA II TR 230/69 kV TAUA II TR2 CE RBF FT TR 230/69 kV TAUA II TR2 CE 007/2005 IGPM RBNI REA 2823/2011 2/3/2015 2/3/2055 1,710,835.49
  TAUA II CE 90/-45 Mvar TAUA II CE1 CE RB FT CE 90/-45 Mvar TAUA II CE1 CE 007/2005 IGPM RBNI REA 3402/2012 15/12/2016 15/12/2046 10,181,837.31
  TEIX. FREITAS II IB 230 kV MG 230 kV TEIX. FREITAS II MG1 BA IB1 DIT   014/2008 IPCA RPEC CC 014/2008 16/10/2008 16/10/2038 57,633.20
  TEIX. FREITAS II BC 138 kV 10 Mvar TEIX. FREITAS II BC1 BA DIT   014/2008 IPCA RPEC CC 014/2008 16/10/2008 16/10/2038 73,281.37
  TEIX. FREITAS II MC 138 kV TR 230/138 kV TEIX. FREITAS II TR1 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 86,419.07
  TEIX. FREITAS II MC 138 kV BC 138 kV 10 Mvar TEIX. FREITAS II BC1 BA DIT   014/2008 IPCA RPEC CC 014/2008 16/10/2008 16/10/2038 88,747.53
  TEIX. FREITAS II MG 230 kV TEIX. FREITAS II MG1 BA RB FT MG 230 kV TEIX. FREITAS II MG1 BA 014/2008 IPCA RBNI REA 2823/2011 19/06/2019 19/06/2051 97,322.38
  TEIX. FREITAS II TR 230/138 kV TEIX. FREITAS II TRR1 BA RBF FT TR 230/138 kV TEIX. FREITAS II TRR1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 113,575.65
  TEIX. FREITAS II EL 138 kV TEIX. FREITAS II  DIST2 DIT   014/2008 IPCA RPEC CC 014/2008 16/10/2008 16/10/2038 114,697.81
  TEIX. FREITAS II EL 138 kV TEIX. FREITAS II  DIST1 DIT   014/2008 IPCA RPEC CC 014/2008 16/10/2008 16/10/2038 114,697.81
  TEIX. FREITAS II IB 230 kV MG 230 kV TEIX. FREITAS II MG1 BA IB1 RB FT MG 230 kV TEIX. FREITAS II MG1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 134,679.69
  TEIX. FREITAS II MC 230 kV TR 230/138 kV TEIX. FREITAS II TR1 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 238,637.24
  TEIX. FREITAS II EL 230 kV TEIX. FREITAS II LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 276,388.80
  TEIX. FREITAS II TR 230/138 kV TEIX. FREITAS II TR1 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 340,725.19
  TEIX. FREITAS II MC 138 kV TR 230/138 kV TEIX. FREITAS II TR2 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR2 BA 014/2008 IPCA RBNI REA 2823/2011 19/06/2019 19/06/2053 427,402.06
  TEIX. FREITAS II MC 230 kV TR 230/138 kV TEIX. FREITAS II TR2 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR2 BA 014/2008 IPCA RBNI REA 2823/2011 19/06/2019 19/06/2053 537,847.29
  TEIX. FREITAS II EL 230 kV TEIX. FREITAS II LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA RB FT LT 230 kV EUNAPOLIS /TEIX. FREITAS II C-2 BA 018/2009 IPCA RBL CC 018/2009 3/8/2009 3/8/2039 755,935.88
  TEIX. FREITAS II MG 230 kV TEIX. FREITAS II MG1 BA RB FT MG 230 kV TEIX. FREITAS II MG1 BA 014/2008 IPCA RBL CC 014/2008 16/10/2008 16/10/2038 959,331.70
  TEIX. FREITAS II TR 230/138 kV TEIX. FREITAS II TR2 BA RBF FT TR 230/138 kV TEIX. FREITAS II TR2 BA 014/2008 IPCA RBNI REA 2823/2011 19/06/2019 19/06/2059 1,906,872.09
  TERESINA EL 69 kV TERESINA  DIST3 DIT   061/2001 IPCA RMEL REN 443/2011 31/01/2016 30/01/2039 6,919.58
  TERESINA RTL 230 kV 10 MVAr TERESINA RT1 PI RB FT RTL 230 kV 10 MVAr TERESINA RT1 PI 061/2001 IPCA RMEL REN 443/2011 30/08/2017 29/08/2052 9,240.07
  TERESINA RTL 230 kV 10 MVAr TERESINA RT1 PI RB FT RTL 230 kV 10 MVAr TERESINA RT1 PI 061/2001 IPCA RMEL REN 443/2011 30/08/2017 29/08/2052 9,240.07
  TERESINA RTL 230 kV 10 MVAr TERESINA RT2 PI RB FT RTL 230 kV 10 MVAr TERESINA RT2 PI 061/2001 IPCA RMEL REN 443/2011 31/08/2017 30/08/2052 9,240.65
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC5 PI DIT   061/2001 IPCA RMEL REN 643/2014 23/04/2014 22/04/2028 10,137.50
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC6 PI DIT   061/2001 IPCA RMEL REN 643/2014 26/04/2014 25/04/2028 10,142.04
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC7 PI DIT   061/2001 IPCA RMEL REN 643/2014 27/04/2014 26/04/2028 10,143.56
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC8 PI DIT   061/2001 IPCA RMEL REN 643/2014 28/04/2014 27/04/2028 10,145.08
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC9 PI DIT   061/2001 IPCA RMEL REN 643/2014 30/04/2014 29/04/2028 10,148.11
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBNI REA 5861/2016 3/5/2017 2/5/2045 11,090.66
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBNI REA 5861/2016 3/5/2017 2/5/2045 11,090.66
  TERESINA EL 69 kV TERESINA  DIST4 DIT   061/2001 IPCA RCDM REA 758/2006 13/03/2022 12/3/2052 11,415.60
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036 19,864.97
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBNI DSP 386/2021 17/02/2021 16/02/2036 19,864.97
  TERESINA EL 69 kV TERESINA  DIST6 DIT   061/2001 IPCA RCDM REA 758/2006 13/03/2022 12/3/2052 25,265.99
  TERESINA MC 69 kV TT 69/13,8 kV TERESINA TA2 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  TERESINA MC 69 kV TT 69/13,8 kV TERESINA TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC9 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC8 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC7 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC6 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  TERESINA BC 13,8 kV 3,6 Mvar TERESINA BC5 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 30,955.39
  TERESINA IB 13,8 kV MG 230 kV TERESINA MG1 PI IB2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 31,948.27
  TERESINA EL 230 kV TERESINA LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RMEL REN 643/2014 16/03/2014 15/03/2042 38,670.51
  TERESINA EL 230 kV TERESINA LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RMEL REN 643/2014 25/06/2014 24/06/2042 39,005.93
  TERESINA EL 230 kV TERESINA LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 061/2001 IPCA RMEL REN 643/2014 2/11/2014 1/11/2042 39,437.65
  TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RMEL REN 643/2014 31/12/2014 30/12/2042 39,633.60
  TERESINA IB 69 kV MG 230 kV TERESINA MG1 PI IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  TERESINA IB 13,8 kV MG 230 kV TERESINA MG1 PI IB2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 44,100.90
  TERESINA MC 13,8 kV TR 230/69 kV TERESINA TR1 PI RBF FT TR 230/69 kV TERESINA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,453.67
  TERESINA MC 13,8 kV TR 230/13,8 kV TERESINA TR2 PI RBF FT TR 230/13,8 kV TERESINA TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,453.67
  TERESINA EL 13,8 kV TERESINA  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  TERESINA EL 13,8 kV TERESINA  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  TERESINA EL 13,8 kV TERESINA  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  TERESINA EL 13,8 kV TERESINA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  TERESINA EL 13,8 kV TERESINA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  TERESINA EL 13,8 kV TERESINA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73

 

127 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  TERESINA EL 13,8 kV TERESINA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 54,727.73
  TERESINA RTL 230 kV 3,33 Mvar TERESINA RTR1 PI RB FT RTL 230 kV 3,33 Mvar TERESINA RTR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,763.78
  TERESINA MC 69 kV TR 230/69 kV TERESINA TR6 PI RBF FT TR 230/69 kV TERESINA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  TERESINA MC 69 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  TERESINA MC 69 kV TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  TERESINA MC 69 kV TR 230/69 kV TERESINA TR3 PI RBF FT TR 230/69 kV TERESINA TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  TERESINA MC 69 kV TR 230/69 kV TERESINA TR1 PI RBF FT TR 230/69 kV TERESINA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  TERESINA MC 13,8 kV TR 230/69 kV TERESINA TR1 PI RBF FT TR 230/69 kV TERESINA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 69,645.47
  TERESINA MC 13,8 kV RTB 13,8 kV 5 Mvar TERESINA RT2 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 70,282.34
  TERESINA MC 13,8 kV RTB 13,8 kV 5 Mvar TERESINA RT1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 70,282.34
  TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC3 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  TERESINA MC 13,8 kV BC 13,8 kV 3,6 Mvar TERESINA BC9 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  TERESINA MC 13,8 kV BC 13,8 kV 3,6 Mvar TERESINA BC8 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  TERESINA MC 13,8 kV BC 13,8 kV 3,6 Mvar TERESINA BC7 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  TERESINA MC 13,8 kV BC 13,8 kV 3,6 Mvar TERESINA BC6 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  TERESINA MC 13,8 kV BC 13,8 kV 3,6 Mvar TERESINA BC5 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,182.65
  TERESINA EL 13,8 kV TERESINA  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  TERESINA EL 13,8 kV TERESINA  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  TERESINA EL 13,8 kV TERESINA  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  TERESINA EL 13,8 kV TERESINA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  TERESINA EL 13,8 kV TERESINA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  TERESINA EL 13,8 kV TERESINA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  TERESINA EL 13,8 kV TERESINA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 75,545.31
  TERESINA EL 69 kV TERESINA  DIST9 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TERESINA EL 69 kV TERESINA  DIST8 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TERESINA EL 69 kV TERESINA  DIST7 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TERESINA EL 69 kV TERESINA  DIST6 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TERESINA EL 69 kV TERESINA  DIST5 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TERESINA EL 69 kV TERESINA  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TERESINA EL 69 kV TERESINA  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TERESINA EL 69 kV TERESINA  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TERESINA EL 69 kV TERESINA  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TERESINA EL 69 kV TERESINA  DIS12 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TERESINA EL 69 kV TERESINA  DIS11 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TERESINA EL 69 kV TERESINA  DIS10 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  TERESINA MC 69 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  TERESINA MC 69 kV TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 90,070.36
  TERESINA TT 69/13,8 kV TERESINA TA2 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  TERESINA TT 69/13,8 kV TERESINA TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  TERESINA MC 230 kV RTL 230 kV 10 MVAr TERESINA RT2 PI RB FT RTL 230 kV 10 MVAr TERESINA RT2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  TERESINA MC 230 kV RTL 230 kV 10 MVAr TERESINA RT1 PI RB FT RTL 230 kV 10 MVAr TERESINA RT1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 95,607.05
  TERESINA IB 13,8 kV MG 230 kV TERESINA MG1 PI IB2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 96,738.53
  TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC3 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 103,780.96
  TERESINA EL 69 kV TERESINA  DIST9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  TERESINA EL 69 kV TERESINA  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  TERESINA EL 69 kV TERESINA  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  TERESINA EL 69 kV TERESINA  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  TERESINA EL 69 kV TERESINA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  TERESINA EL 69 kV TERESINA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  TERESINA EL 69 kV TERESINA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  TERESINA EL 69 kV TERESINA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  TERESINA EL 69 kV TERESINA  DIS10 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 105,298.82
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RMEL REN 443/2011 23/11/2016 22/11/2049 111,518.43
  TERESINA BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,014.30
  TERESINA BC 69 kV 21,3 Mvar TERESINA BC3 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,014.30
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RMEL REN 443/2011 29/03/2017 28/03/2049 118,470.50
  TERESINA MC 230 kV RTL 230 kV 10 MVAr TERESINA RT1 PI RB FT RTL 230 kV 10 MVAr TERESINA RT1 PI 061/2001 IPCA RMEL REN 443/2011 4/8/2017 3/8/2049 119,505.88
  TERESINA MC 230 kV RTL 230 kV 10 MVAr TERESINA RT2 PI RB FT RTL 230 kV 10 MVAr TERESINA RT2 PI 061/2001 IPCA RMEL REN 443/2011 1/12/2017 30/11/2049 120,567.45
  TERESINA TT 69/13,8 kV TERESINA TA2 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  TERESINA TT 69/13,8 kV TERESINA TA1 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 127,082.20
  TERESINA RTB 13,8 kV 5 Mvar TERESINA RT2 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  TERESINA RTB 13,8 kV 5 Mvar TERESINA RT1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,494.01
  TERESINA IB 230 kV MG 230 kV TERESINA MG1 PI IB2 RB FT MG 230 kV TERESINA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  TERESINA MC 13,8 kV TR 230/69 kV TERESINA TR1 PI RBF FT TR 230/69 kV TERESINA TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 152,772.39
  TERESINA BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 160,144.34
  TERESINA BC 69 kV 21,3 Mvar TERESINA BC3 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 160,144.34
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,196.02
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,196.02
  TERESINA EL 13,8 kV TERESINA  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 165,714.13
  TERESINA EL 13,8 kV TERESINA  DIST6 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 165,714.13
  TERESINA EL 13,8 kV TERESINA  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 165,714.13
  TERESINA EL 13,8 kV TERESINA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 165,714.13
  TERESINA EL 13,8 kV TERESINA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 165,714.13
  TERESINA EL 13,8 kV TERESINA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 165,714.13
  TERESINA EL 13,8 kV TERESINA  DIST1 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 165,714.13
  TERESINA MC 230 kV TR 230/69 kV TERESINA TR6 PI RBF FT TR 230/69 kV TERESINA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  TERESINA MC 230 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  TERESINA MC 230 kV TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  TERESINA MC 230 kV TR 230/69 kV TERESINA TR3 PI RBF FT TR 230/69 kV TERESINA TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  TERESINA MC 230 kV TR 230/13,8 kV TERESINA TR2 PI TR1 RBF FT TR 230/13,8 kV TERESINA TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  TERESINA RTL 230 kV 10 MVAr TERESINA RT2 PI RB FT RTL 230 kV 10 MVAr TERESINA RT2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  TERESINA RTL 230 kV 10 MVAr TERESINA RT1 PI RB FT RTL 230 kV 10 MVAr TERESINA RT1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,478.90
  TERESINA TR 230/69 kV TERESINA TR1 PI RBF FT TR 230/69 kV TERESINA TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 192,713.19
  TERESINA TR 230/13,8 kV TERESINA TR2 PI RBF FT TR 230/13,8 kV TERESINA TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 192,713.19

 

128 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  TERESINA MC 69 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 197,575.89
  TERESINA BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,444.63
  TERESINA BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 199,444.63
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 221,132.09
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 221,132.09
  TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  TERESINA MC 69 kV BC 69 kV 21,3 Mvar TERESINA BC3 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 227,651.07
  TERESINA EL 69 kV TERESINA  DIST9 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  TERESINA EL 69 kV TERESINA  DIST8 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  TERESINA EL 69 kV TERESINA  DIST7 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  TERESINA EL 69 kV TERESINA  DIST5 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  TERESINA EL 69 kV TERESINA  DIST4 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  TERESINA EL 69 kV TERESINA  DIST3 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  TERESINA EL 69 kV TERESINA  DIST2 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  TERESINA EL 69 kV TERESINA  DIS10 DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 230,980.63
  TERESINA MC 230 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  TERESINA MC 230 kV TR 230/69 kV TERESINA TR3 PI RBF FT TR 230/69 kV TERESINA TR3 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  TERESINA EL 230 kV TERESINA LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  TERESINA EL 230 kV TERESINA LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  TERESINA EL 230 kV TERESINA LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  TERESINA EL 230 kV TERESINA LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-2 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  TERESINA BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,310.27
  TERESINA BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,310.27
  TERESINA TT 69/13,8 kV TERESINA TA2 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 278,764.05
  TERESINA EL 230 kV TERESINA LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  TERESINA EL 230 kV TERESINA LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 324,535.10
  TERESINA BC 69 kV 21,3 Mvar TERESINA BC4 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 351,288.25
  TERESINA TR 230/69 kV TERESINA TR6 PI RBF FT TR 230/69 kV TERESINA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  TERESINA TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  TERESINA TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  TERESINA TR 230/69 kV TERESINA TR3 PI RBF FT TR 230/69 kV TERESINA TR3 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 367,718.15
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 485,069.32
  TERESINA MC 230 kV BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 485,069.32
  TERESINA TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  TERESINA TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  TERESINA TR 230/69 kV TERESINA TR3 PI RBF FT TR 230/69 kV TERESINA TR3 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 507,592.41
  TERESINA MC 230 kV TR 230/69 kV TERESINA TR5 PI RBF FT TR 230/69 kV TERESINA TR5 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  TERESINA BC 230 kV 50,5 MVAr TERESINA BC2 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 603,913.08
  TERESINA BC 230 kV 50,5 MVAr TERESINA BC1 PI RB FT BC 230 kV 50,5 MVAr TERESINA BC1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 603,913.08
  TERESINA EL 230 kV TERESINA LT 230 kV TERESINA /PIRIPIRI C-1 PI RB FT LT 230 kV TERESINA /PIRIPIRI C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  TERESINA EL 230 kV TERESINA LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  TERESINA EL 230 kV TERESINA LT 230 kV B. ESPERANCA /TERESINA C-1 PI RB FT LT 230 kV B. ESPERANCA /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 711,891.32
  TERESINA MG 230 kV TERESINA MG1 PI RB FT MG 230 kV TERESINA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 800,232.17
  TERESINA MG 230 kV TERESINA MG1 PI RB FT MG 230 kV TERESINA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,104,628.04
  TERESINA TR 230/69 kV TERESINA TR4 PI RBF FT TR 230/69 kV TERESINA TR4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,113,440.84
  TERESINA MG 230 kV TERESINA MG1 PI RB FT MG 230 kV TERESINA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,423,081.91
  TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR2 PI RB FT TR 500/230 kV TERESINA II TR2 PI 061/2001 IPCA RMEL REN 643/2014 6/9/2015 5/9/2045 1,262.92
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 18/05/2013 17/05/2043 16,374.78
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB3 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 26/08/2013 25/08/2043 16,509.92
  TERESINA II RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RMEL REN 443/2011 1/7/2015 30/06/2045 17,420.82
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 16/08/2015 15/08/2045 17,483.00
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB3 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 22/11/2015 21/11/2045 17,615.44
  TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035 20,327.68
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBNI REA 5861/2016 8/6/2016 7/6/2044 27,147.36
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBNI REA 5861/2016 8/6/2016 7/6/2044 27,147.36
  TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 643/2014 30/11/2013 29/11/2030 27,714.23
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2044 27,806.09
  TERESINA II RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RMEL REN 443/2011 18/05/2013 17/05/2043 32,749.56
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB3 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 643/2014 26/08/2013 25/08/2043 33,019.86
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB3 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 22/11/2015 21/11/2045 35,230.88
  TERESINA II MC 13,8 kV RTS 13,8 kV 5 MVAr TERESINA II RT1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 38,914.78
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RMEL REN 643/2014 18/12/2013 17/12/2048 41,416.31
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT3 PI RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RMEL REN 643/2014 19/12/2013 18/12/2048 41,419.14
  TERESINA II RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RMEL REN 643/2014 11/1/2014 10/1/2049 41,484.36
  TERESINA II MC 500 kV RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RMEL REN 643/2014 18/05/2013 17/05/2043 49,124.34
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 22/08/2015 21/08/2045 52,473.31
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 20/09/2015 19/09/2045 52,590.89
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RMEL REN 443/2011 15/11/2015 14/11/2045 52,817.94
  TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RMEL REN 443/2011 29/11/2015 28/11/2045 52,874.70
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RMEL REN 443/2011 13/12/2015 12/12/2045 52,931.47
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RMEL REN 443/2011 18/02/2016 17/02/2046 53,203.12
  TERESINA II MC 13,8 kV RTS 13,8 kV 5 MVAr TERESINA II RT1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 53,717.36
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RMEL REN 443/2011 19/10/2015 18/10/2045 54,347.59
  TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RMEL REN 643/2014 16/02/2014 15/02/2044 61,694.04
  TERESINA II MC 13,8 kV CS 150/-105 MVAr TERESINA II CS1 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 62,856.97
  TERESINA II MC 13,8 kV CS 150/-105 MVAr TERESINA II CS1 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 86,766.78
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBNI REA 5861/2016 8/6/2016 7/6/2031 103,359.64
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBNI REA 5861/2016 8/6/2016 7/6/2031 103,359.64
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2031 115,676.92
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBNI REA 5861/2016 10/6/2016 9/6/2031 115,676.92
  TERESINA II MC 13,8 kV RTS 13,8 kV 5 MVAr TERESINA II RT1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 117,832.94
  TERESINA II RTS 13,8 kV 5 MVAr TERESINA II RT1 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,494.01

 

129 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  TERESINA II IB 230 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  TERESINA II RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RMEL REN 443/2011 12/4/2015 11/4/2045 144,374.29
  TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR2 PI RB FT TR 500/230 kV TERESINA II TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  TERESINA II MC 230 kV TR 230/13,8 kV TERESINA II TR3 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,960.96
  TERESINA II RTS 13,8 kV 5 MVAr TERESINA II RT1 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 180,131.90
  TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBNI REA 8328/2019 12/4/2022 12/4/2053 183,753.12
  TERESINA II MC 13,8 kV CS 150/-105 MVAr TERESINA II CS1 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 190,329.23
  TERESINA II IB 230 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  TERESINA II TR 230/13,8 kV TERESINA II TRR2 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 200,592.80
  TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 220,807.62
  TERESINA II MC 230 kV TR 230/13,8 kV TERESINA II TR3 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 220,807.62
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 227,266.99
  TERESINA II RTB 500 kV 40 Mvar TERESINA II RTR1 PI RB FT RTB 500 kV 40 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 249,484.75
  TERESINA II MC 500 kV RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  TERESINA II MC 500 kV RTL 500 kV 150 Mvar TERESINA II RT3 PI RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  TERESINA II MC 500 kV RTL 500 kV 100 MVAr TERESINA II RT2 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  TERESINA II MC 500 kV RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  TERESINA II TR 230/13,8 kV TERESINA II TRR2 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 276,895.18
  TERESINA II RTL 500 kV 60 Mvar TERESINA II RTR1 PI RB FT RTL 500 kV 60 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,025.77
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 313,715.82
  TERESINA II RTB 500 kV 40 Mvar TERESINA II RTR1 PI RB FT RTB 500 kV 40 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,384.87
  TERESINA II MC 500 kV RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 360,781.97
  TERESINA II RTL 500 kV 60 Mvar TERESINA II RTR1 PI RB FT RTL 500 kV 60 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 392,064.76
  TERESINA II RTS 13,8 kV 5 MVAr TERESINA II RT1 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 395,132.42
  TERESINA II IB 230 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 419,410.17
  TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR2 PI RB FT TR 500/230 kV TERESINA II TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB3 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 484,357.56
  TERESINA II MC 230 kV TR 230/13,8 kV TERESINA II TR3 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 484,357.56
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  TERESINA II TR 500/230 kV TERESINA II TRR1 PI RB FT TR 500/230 kV TERESINA II TRR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 504,801.61
  TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  TERESINA II TR 230/13,8 kV TERESINA II TR3 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 601,778.40
  TERESINA II TR 230/13,8 kV TERESINA II TRR2 PI RB FT TR 230/13,8 kV TERESINA II TRR2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 607,389.71
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA III C-2 PI RB FT LT 230 kV TERESINA II /TERESINA III C-2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 9/12/2041 641,646.22
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA III C-1 PI RB FT LT 230 kV TERESINA II /TERESINA III C-1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 9/12/2041 641,646.22
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-2 PI RB FT LT 230 kV TERESINA II /TERESINA C-2 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  TERESINA II EL 230 kV TERESINA II LT 230 kV TERESINA II /TERESINA C-1 PI RB FT LT 230 kV TERESINA II /TERESINA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 688,158.45
  TERESINA II TR 500/230 kV TERESINA II TRR1 PI RB FT TR 500/230 kV TERESINA II TRR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 696,820.29
  TERESINA II RTL 500 kV 100 MVAr TERESINA II RT2 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 701,859.07
  TERESINA II RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 701,859.07
  TERESINA II RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 701,859.07
  TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBNI REA 8328/2019 12/4/2022 12/4/2053 720,523.41
  TERESINA II RTB 500 kV 40 Mvar TERESINA II RTR1 PI RB FT RTB 500 kV 40 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 755,433.24
  TERESINA II MC 500 kV RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 791,401.48
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 805,482.14
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT3 PI RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 805,482.14
  TERESINA II TR 230/13,8 kV TERESINA II TR3 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 830,685.54
  TERESINA II RTL 500 kV 60 Mvar TERESINA II RTR1 PI RB FT RTL 500 kV 60 Mvar TERESINA II RTR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 860,022.55
  TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR4 PI RB FT TR 500/230 kV TERESINA II TR4 PI 061/2001 IPCA RBNI REA 8328/2019 12/4/2022 12/4/2050 949,048.16
  TERESINA II RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 968,835.33
  TERESINA II RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 968,835.33
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,111,875.01
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT3 PI RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,111,875.01
  TERESINA II MC 230 kV TR 500/230 kV TERESINA II TR3 PI RB FT TR 500/230 kV TERESINA II TR3 PI 061/2001 IPCA RBNI REA 2823/2011 1/6/2015 31/05/2045 1,231,192.52
  TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,306,279.44
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB2 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB1 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR3 PI RB FT TR 500/230 kV TERESINA II TR3 PI 061/2001 IPCA RBNI REA 2823/2011 1/6/2015 31/05/2046 1,386,491.66
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,480,048.26
  TERESINA II EL 500 kV TERESINA II LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,480,048.26
  TERESINA II TR 500/230 kV TERESINA II TR2 PI RB FT TR 500/230 kV TERESINA II TR2 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,514,404.83
  TERESINA II TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,514,404.83
  TERESINA II TR 500/230 kV TERESINA II TRR1 PI RB FT TR 500/230 kV TERESINA II TRR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,528,525.95
  TERESINA II MC 500 kV TR 500/230 kV TERESINA II TR4 PI RB FT TR 500/230 kV TERESINA II TR4 PI 061/2001 IPCA RBNI REA 8328/2019 12/4/2022 12/4/2051 1,541,490.23
  TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBNI REA 2823/2011 17/04/2015 16/04/2045 1,567,937.92
  TERESINA II CS 150/-105 MVAr TERESINA II CS1 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,683,466.69
  TERESINA II MC 500 kV RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RBNI REA 2823/2011 21/07/2015 20/07/2046 1,727,566.70
  TERESINA II IB 500 kV MG 500 kV TERESINA II MG1 PI IB4 RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBNI REA 2823/2011 29/09/2014 28/09/2045 1,740,329.13
  TERESINA II TR 230/13,8 kV TERESINA II TR3 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,822,169.12
  TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,930,570.85
  TERESINA II TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,090,460.86
  TERESINA II RTL 500 kV 100 Mvar TERESINA II RT1 PI RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,125,210.73
  TERESINA II RTB 500 kV 100 Mvar TERESINA II RT5 PI RB FT RTB 500 kV 100 Mvar TERESINA II RT5 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,125,210.73

 

130 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  TERESINA II CS 150/-105 MVAr TERESINA II CS1 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,323,831.22
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT4 PI RB FT RTL 500 kV 150 Mvar TERESINA II RT4 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,438,978.66
  TERESINA II RTL 500 kV 150 Mvar TERESINA II RT3 PI RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,438,978.66
  TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,664,929.96
  TERESINA II TR 500/230 kV TERESINA II TR4 PI RB FT TR 500/230 kV TERESINA II TR4 PI 061/2001 IPCA RBNI REA 8328/2019 12/4/2022 12/4/2056 3,075,837.62
  TERESINA II TR 500/230 kV TERESINA II TR3 PI RB FT TR 500/230 kV TERESINA II TR3 PI 061/2001 IPCA RBNI REA 2823/2011 1/6/2015 31/05/2050 4,282,736.49
  TERESINA II TR 500/230 kV TERESINA II TR1 PI RB FT TR 500/230 kV TERESINA II TR1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,585,577.85
  TERESINA II CS 150/-105 MVAr TERESINA II CS1 PI RB FT CS 150/-105 MVAr TERESINA II CS1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,097,492.70
  TERESINA II MG 500 kV TERESINA II MG1 PI RB FT MG 500 kV TERESINA II MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,845,717.59
  TERESINA III MG 230 kV TERESINA III MG1 PI RB FT MG 230 kV TERESINA III MG1 PI 017/2011 IPCA RBNI REA 5166/2015 5/10/2018 4/10/2046 37,863.73
  TERESINA III MC 69 kV TT 69/0 kV TERESINA III TT1 PI DIT   017/2011 IPCA RPEC CC 017/2011 5/6/2018 9/12/2041 76,799.71
  TERESINA III IB 69 kV MG 230 kV TERESINA III MG1 PI IB1 DIT   017/2011 IPCA RPEC CC 017/2011 5/6/2018 9/12/2041 124,780.83
  TERESINA III MG 230 kV TERESINA III MG1 PI RB FT MG 230 kV TERESINA III MG1 PI 017/2011 IPCA RBNI REA 5166/2015 5/10/2018 4/10/2047 130,851.72
  TERESINA III MC 69 kV TR 230/69 kV TERESINA III TR2 PI RBF FT TR 230/69 kV TERESINA III TR2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 9/12/2041 185,900.74
  TERESINA III MC 69 kV TR 230/69 kV TERESINA III TR1 PI RBF FT TR 230/69 kV TERESINA III TR1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 9/12/2041 185,900.74
  TERESINA III TT 69/0 kV TERESINA III TT1 PI DIT   017/2011 IPCA RPEC CC 017/2011 5/6/2018 9/12/2041 206,260.12
  TERESINA III EL 69 kV TERESINA III  DIST3 DIT   017/2011 IPCA RPEC CC 017/2011 5/6/2018 9/12/2041 213,009.01
  TERESINA III EL 69 kV TERESINA III  DIST2 DIT   017/2011 IPCA RPEC CC 017/2011 5/6/2018 9/12/2041 213,009.01
  TERESINA III EL 69 kV TERESINA III  DIST1 DIT   017/2011 IPCA RPEC CC 017/2011 5/6/2018 9/12/2041 213,009.01
  TERESINA III IB 230 kV MG 230 kV TERESINA III MG1 PI IB1 RB FT MG 230 kV TERESINA III MG1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 9/12/2041 346,234.25
  TERESINA III MC 230 kV TR 230/69 kV TERESINA III TR2 PI RBF FT TR 230/69 kV TERESINA III TR2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 9/12/2041 456,915.49
  TERESINA III MC 230 kV TR 230/69 kV TERESINA III TR1 PI RBF FT TR 230/69 kV TERESINA III TR1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 9/12/2041 456,915.49
  TERESINA III MC 69 kV TR 230/69 kV TERESINA III TR3 PI RBF FT TR 230/69 kV TERESINA III TR3 PI 017/2011 IPCA RBNI REA 5166/2015 5/10/2018 4/10/2049 479,249.16
  TERESINA III EL 230 kV TERESINA III LT 230 kV TERESINA II /TERESINA III C-2 PI RB FT LT 230 kV TERESINA II /TERESINA III C-2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 9/12/2041 641,646.22
  TERESINA III EL 230 kV TERESINA III LT 230 kV TERESINA II /TERESINA III C-1 PI RB FT LT 230 kV TERESINA II /TERESINA III C-1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 9/12/2041 641,646.22
  TERESINA III MC 230 kV TR 230/69 kV TERESINA III TR3 PI RBF FT TR 230/69 kV TERESINA III TR3 PI 017/2011 IPCA RBNI REA 5166/2015 5/10/2018 4/10/2049 1,244,343.80
  TERESINA III MG 230 kV TERESINA III MG1 PI RB FT MG 230 kV TERESINA III MG1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 9/12/2041 1,414,863.12
  TERESINA III TR 230/69 kV TERESINA III TR2 PI RBF FT TR 230/69 kV TERESINA III TR2 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 9/12/2041 1,610,458.52
  TERESINA III TR 230/69 kV TERESINA III TR1 PI RBF FT TR 230/69 kV TERESINA III TR1 PI 017/2011 IPCA RBL CC 017/2011 18/10/2017 9/12/2041 1,610,458.52
  TERESINA III TR 230/69 kV TERESINA III TR3 PI RBF FT TR 230/69 kV TERESINA III TR3 PI 017/2011 IPCA RBNI REA 5166/2015 5/10/2018 4/10/2053 2,323,502.02
  TIANGUA II EL 500 kV TIANGUA II LT 500 kV TIANGUA II /SOBRAL III C-1 CE RB FT LT 500 kV TIANGUA II /SOBRAL III C-1 CE 061/2001 IPCA RBNI REA 9688/2021 3/10/2019 2/10/2047 184,015.06
  TIANGUA II EL 500 kV TIANGUA II LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE RB FT LT 500 kV TERESINA II /TIANGUA II C-1 PI/CE 061/2001 IPCA RBNI REA 9688/2021 19/09/2019 18/09/2047 184,015.06
  TOUROS TT 69/0 kV TOUROS TT1 RN ICG   018/2012 IPCA RICG CC 018/2012 12/5/2017 1/6/2042 79,677.44
  TOUROS MC 69 kV TT 69/0 kV TOUROS TT1 RN ICG   018/2012 IPCA RICG CC 018/2012 12/5/2017 1/6/2042 82,857.22
  TOUROS IB 69 kV MG 69 kV TOUROS MG2 RN IB1 ICG   018/2012 IPCA RICG CC 018/2012 12/5/2017 1/6/2042 133,443.57
  TOUROS MC 69 kV TR 230/69 kV TOUROS TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 12/5/2017 1/6/2042 195,725.61
  TOUROS IB 230 kV MG 230 kV TOUROS MG1 RN IB1 RB FT MG 230 kV TOUROS MG1 RN 018/2012 IPCA RBL CC 018/2012 12/5/2017 1/6/2042 332,396.12
  TOUROS MC 230 kV TR 230/69 kV TOUROS TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 12/5/2017 1/6/2042 493,544.80
  TOUROS EL 230 kV TOUROS LT 230 kV TOUROS /CEARA MIRIM II C-1 RN RB FT LT 230 kV TOUROS /CEARA MIRIM II C-1 RN 018/2012 IPCA RBL CC 018/2012 12/5/2017 1/6/2042 537,773.26
  TOUROS MG 69 kV TOUROS MG2 RN ICG   018/2012 IPCA RICG CC 018/2012 12/5/2017 1/6/2042 566,811.94
  TOUROS MG 230 kV TOUROS MG1 RN RB FT MG 230 kV TOUROS MG1 RN 018/2012 IPCA RBL CC 018/2012 12/5/2017 1/6/2042 897,063.88
  TOUROS TR 230/69 kV TOUROS TR1 RN ICG   018/2012 IPCA RICG CC 018/2012 12/5/2017 1/6/2042 1,495,155.00
  U.SOBRADINHO MC 69 kV RTN 69 kV 0 Mvar U.SOBRADINHO RTN5 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,755.22
  U.SOBRADINHO MC 69 kV RTN 69 kV 0 Mvar U.SOBRADINHO RTN4 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,755.22
  U.SOBRADINHO MC 69 kV RTN 69 kV 0 Mvar U.SOBRADINHO RTN3 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,755.22
  U.SOBRADINHO RTN 69 kV 0 Mvar U.SOBRADINHO RTN5 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 14,361.37
  U.SOBRADINHO RTN 69 kV 0 Mvar U.SOBRADINHO RTN4 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 14,361.37
  U.SOBRADINHO RTN 69 kV 0 Mvar U.SOBRADINHO RTN3 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 14,361.37
  U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB2 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RMEL REN 443/2011 5/3/2016 4/3/2046 17,756.00
  U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBNI REN 443/2011 3/2/2013 31/12/2042 18,993.03
  U.SOBRADINHO EL 500 kV U.SOBRADINHO LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBNI REA 5861/2016 9/6/2016 8/6/2031 39,513.16
  U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBNI REA 5861/2016 19/09/2017 18/09/2032 40,783.57
  U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBNI REA 5861/2016 19/09/2017 18/09/2032 40,783.57
  U.SOBRADINHO MC 13,8 kV TR 500/230 kV U.SOBRADINHO TR4 BA RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  U.SOBRADINHO MC 500 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2046 54,423.50
  U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 55,765.94
  U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RMEL REN 443/2011 12/2/2017 11/2/2047 67,047.12
  U.SOBRADINHO MC 230 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RMEL REN 443/2011 27/11/2017 26/11/2047 68,458.91
  U.SOBRADINHO EL 230 kV U.SOBRADINHO  SET.GAME. FIC DIT   061/2001 IPCA RCDM REN 443/2011 3/2/2013 31/12/2042 81,004.09
  U.SOBRADINHO EL 230 kV U.SOBRADINHO  S.PED.LAGO FIC DIT   061/2001 IPCA RCDM REN 443/2011 3/2/2013 31/12/2042 81,004.09
  U.SOBRADINHO EL 230 kV U.SOBRADINHO  PED. BRANCA FIC DIT   061/2001 IPCA RCDM REN 443/2011 3/2/2013 31/12/2042 81,004.09
  U.SOBRADINHO IB 230 kV MG 500 kV U.SOBRADINHO MG1 BA IB1 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  U.SOBRADINHO MC 230 kV TR 500/230 kV U.SOBRADINHO TR4 BA MC2 RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,348.94
  U.SOBRADINHO MC 230 kV TR 500/230 kV U.SOBRADINHO TR4 BA MC1 RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,348.94
  U.SOBRADINHO MC 230 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,572.97
  U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBNI REA 2823/2011 15/12/2014 14/12/2042 192,192.14
  U.SOBRADINHO MC 230 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 232,695.51
  U.SOBRADINHO RTL 500 kV 33,3 Mvar U.SOBRADINHO RTR1 BA RB FT RTL 500 kV 33,3 Mvar U.SOBRADINHO RTR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 233,867.79
  U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,104.86
  U.SOBRADINHO MC 500 kV RTL 500 kV 150 Mvar U.SOBRADINHO RT3 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  U.SOBRADINHO MC 500 kV RTL 500 kV 100 Mvar U.SOBRADINHO RT6 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  U.SOBRADINHO MC 500 kV RTL 500 kV 100 Mvar U.SOBRADINHO RT5 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  U.SOBRADINHO MC 500 kV RTL 500 kV 100 Mvar U.SOBRADINHO RT4 BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  U.SOBRADINHO RTL 500 kV 50 Mvar U.SOBRADINHO RTR3 BA RB FT RTL 500 kV 50 Mvar U.SOBRADINHO RTR3 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 268,494.05
  U.SOBRADINHO RTL 500 kV 33,3 Mvar U.SOBRADINHO RTR1 BA RB FT RTL 500 kV 33,3 Mvar U.SOBRADINHO RTR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,827.46
  U.SOBRADINHO RTL 500 kV 50 Mvar U.SOBRADINHO RTR3 BA RB FT RTL 500 kV 50 Mvar U.SOBRADINHO RTR3 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 370,625.00
  U.SOBRADINHO MC 500 kV TR 500/230 kV U.SOBRADINHO TR4 BA RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  U.SOBRADINHO MC 500 kV TR 13,8/500 kV U.SOBRADINHO TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  U.SOBRADINHO MC 500 kV TR 13,8/500 kV U.SOBRADINHO TR2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  U.SOBRADINHO MC 500 kV TR 13,8/500 kV U.SOBRADINHO TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  U.SOBRADINHO MC 500 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB4 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB3 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB2 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB1 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69

 

131 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  U.SOBRADINHO EL 500 kV U.SOBRADINHO LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  U.SOBRADINHO EL 500 kV U.SOBRADINHO LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  U.SOBRADINHO EL 500 kV U.SOBRADINHO LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  U.SOBRADINHO TR 500/230 kV U.SOBRADINHO TRR1 BA RB FT TR 500/230 kV U.SOBRADINHO TRR1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 504,801.61
  U.SOBRADINHO MC 230 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 510,434.51
  U.SOBRADINHO EL 230 kV U.SOBRADINHO LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA RB FT LT 230 kV U.SOBRADINHO /JUAZEIRO II C-2 BA 061/2001 IPCA RBNI REA 2823/2011 10/8/2015 9/8/2045 552,082.72
  U.SOBRADINHO MC 500 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  U.SOBRADINHO TR 500/230 kV U.SOBRADINHO TRR1 BA RB FT TR 500/230 kV U.SOBRADINHO TRR1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 696,820.29
  U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT6 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 701,859.07
  U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT5 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 701,859.07
  U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT4 BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 701,859.07
  U.SOBRADINHO RTL 500 kV 150 Mvar U.SOBRADINHO RT3 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 805,482.14
  U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT6 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 968,835.33
  U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT5 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 968,835.33
  U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT4 BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 968,835.33
  U.SOBRADINHO RTL 500 kV 150 Mvar U.SOBRADINHO RT3 BA RB FT LT 500 kV JUAZEIRO III /U.SOBRADINHO C-1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,111,875.01
  U.SOBRADINHO MC 230 kV TR 500/230 kV U.SOBRADINHO TR3 BA RB FT TR 500/230 kV U.SOBRADINHO TR3 BA 061/2001 IPCA RBNI REA 2823/2011 15/12/2014 14/12/2044 1,291,146.76
  U.SOBRADINHO MC 500 kV TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,306,279.44
  U.SOBRADINHO IB 500 kV MG 500 kV U.SOBRADINHO MG1 BA IB5 RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBNI REA 2823/2011 15/12/2014 14/12/2045 1,426,322.71
  U.SOBRADINHO TR 500/230 kV U.SOBRADINHO TR4 BA RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,514,404.83
  U.SOBRADINHO TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,514,404.83
  U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,912,176.54
  U.SOBRADINHO MC 500 kV TR 500/230 kV U.SOBRADINHO TR3 BA RB FT TR 500/230 kV U.SOBRADINHO TR3 BA 061/2001 IPCA RBNI REA 2823/2011 15/12/2014 14/12/2045 1,939,005.85
  U.SOBRADINHO TR 500/230 kV U.SOBRADINHO TR4 BA RB FT TR 500/230 kV U.SOBRADINHO TR4 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,090,460.86
  U.SOBRADINHO TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,090,460.86
  U.SOBRADINHO RTL 500 kV 100 Mvar U.SOBRADINHO RT6 BA RB FT LT 500 kV U.SOBRADINHO /S.JOAO PIAUI C-1 BA/PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,125,210.73
  U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,639,538.75
  U.SOBRADINHO TR  500/230  kV U.SOBRADINHO   TR5 BA RB FT TR  500/230  kV U.SOBRADINHO   TR5 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,585,577.85
  U.SOBRADINHO TR 500/230 kV U.SOBRADINHO TR3 BA RB FT TR 500/230 kV U.SOBRADINHO TR3 BA 061/2001 IPCA RBNI REA 2823/2011 15/12/2014 14/12/2049 5,654,214.07
  U.SOBRADINHO MG 500 kV U.SOBRADINHO MG1 BA RB FT MG 500 kV U.SOBRADINHO MG1 BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,790,020.11
  UB.ESPERANCA EL 13,8 kV UB.ESPERANCA  S.J.PATOS-01Y2 DIT   061/2001 IPCA RCDM REA 1814/2009 7/1/2015 6/1/2048 19,868.96
  UB.ESPERANCA EL 13,8 kV UB.ESPERANCA  GUADALUPE-01Y1 DIT   061/2001 IPCA RCDM REA 1814/2009 7/1/2015 6/1/2048 19,868.96
  UB.ESPERANCA EL 13,8 kV UB.ESPERANCA  BOA ESPER.-01Y3 DIT   061/2001 IPCA RCDM REA 1814/2009 7/1/2015 6/1/2048 19,868.96
  UB.ESPERANCA MC 69 kV TT 69/69 kV UB.ESPERANCA TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 27,289.31
  UB.ESPERANCA TR 69/13,8 kV UB.ESPERANCA TR7 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  UB.ESPERANCA EL 69 kV UB.ESPERANCA  PARAIBANO-02J3 DIT   061/2001 IPCA RMEL REN 443/2011 17/01/2017 16/01/2049 42,247.11
  UB.ESPERANCA MC 13,8 kV TR 69/13,8 kV UB.ESPERANCA TR7 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  UB.ESPERANCA MC 13,8 kV TR 230/69 kV UB.ESPERANCA TR5 PI RBF FT TR 230/69 kV UB.ESPERANCA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,487.58
  UB.ESPERANCA EL 13,8 kV UB.ESPERANCA  S.J.PATOS-01Y2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  UB.ESPERANCA EL 13,8 kV UB.ESPERANCA  GUADALUPE-01Y1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  UB.ESPERANCA EL 13,8 kV UB.ESPERANCA  BOA ESPER.-01Y3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  UB.ESPERANCA MC 69 kV TR 69/13,8 kV UB.ESPERANCA TR7 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  UB.ESPERANCA MC 69 kV TR 230/69 kV UB.ESPERANCA TR6 PI RBF FT TR 230/69 kV UB.ESPERANCA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  UB.ESPERANCA MC 69 kV TR 230/69 kV UB.ESPERANCA TR5 PI RBF FT TR 230/69 kV UB.ESPERANCA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  UB.ESPERANCA MC 69 kV TR  230/69   kV UB.ESPERANCA   TR8 PI RBF FT TR  230/69   kV UB.ESPERANCA   TR8 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 58,447.43
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB2 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RMEL REN 643/2014 23/03/2014 22/03/2044 61,865.61
  UB.ESPERANCA MC 13,8 kV TR 69/13,8 kV UB.ESPERANCA TR7 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 64,170.73
  UB.ESPERANCA EL 69 kV UB.ESPERANCA  S.J.PATOS-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,128.71
  UB.ESPERANCA EL 69 kV UB.ESPERANCA  PARAIBANO-02J3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,128.71
  UB.ESPERANCA EL 69 kV UB.ESPERANCA  BERTOLINEA-02J2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 72,128.71
  UB.ESPERANCA TT 69/69 kV UB.ESPERANCA TA1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  UB.ESPERANCA MG 230 kV UB.ESPERANCA MG1 PI RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RMEL REN 643/2014 24/07/2015 23/07/2029 106,012.25
  UB.ESPERANCA MC 230 kV TR 230/69 kV UB.ESPERANCA TR6 PI RBF FT TR 230/69 kV UB.ESPERANCA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,415.42
  UB.ESPERANCA MC 230 kV TR  230/69   kV UB.ESPERANCA   TR8 PI RBF FT TR  230/69   kV UB.ESPERANCA   TR8 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,415.42
  UB.ESPERANCA MG 230 kV UB.ESPERANCA MG1 PI RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBNI REA 7761/2019 28/07/2020 27/07/2035 116,404.70
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB3 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB2 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB1 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 138,511.83
  UB.ESPERANCA MC 13,8 kV TR 69/13,8 kV UB.ESPERANCA TR7 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 140,763.15
  UB.ESPERANCA MC 230 kV TR 230/69 kV UB.ESPERANCA TR5 PI RBF FT TR 230/69 kV UB.ESPERANCA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,348.94
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR4 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,348.94
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR3 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,348.94
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR2 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,348.94
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR1 PI DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,348.94
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB3 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB2 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB1 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 191,199.58
  UB.ESPERANCA TR 230/69 kV UB.ESPERANCA TR6 PI RBF FT TR 230/69 kV UB.ESPERANCA TR6 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 192,713.19
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR3 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 208,919.73
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR2 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 208,919.73
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR1 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 208,919.73
  UB.ESPERANCA TR  230/69   kV UB.ESPERANCA   TR8 PI RBF FT TR  230/69   kV UB.ESPERANCA   TR8 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 217,696.01
  UB.ESPERANCA EL 230 kV UB.ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,385.88
  UB.ESPERANCA TR 230/69 kV UB.ESPERANCA TR6 PI RBF FT TR 230/69 kV UB.ESPERANCA TR6 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 266,018.29
  UB.ESPERANCA TR  230/69   kV UB.ESPERANCA   TR8 PI RBF FT TR  230/69   kV UB.ESPERANCA   TR8 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 300,504.19
  UB.ESPERANCA EL 230 kV UB.ESPERANCA LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI RB FT LT 230 kV UB.ESPERANCA /B. ESPERANCA C-1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 305,597.62
  UB.ESPERANCA TR 230/69 kV UB.ESPERANCA TR5 PI RBF FT TR 230/69 kV UB.ESPERANCA TR5 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 310,256.26
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB2 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 419,410.17
  UB.ESPERANCA IB 230 kV MG 230 kV UB.ESPERANCA MG1 PI IB1 RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 419,410.17
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR2 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 458,280.61
  UB.ESPERANCA MC 230 kV TR 13,8/230 kV UB.ESPERANCA TR1 PI DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 458,280.61
  UB.ESPERANCA MG 230 kV UB.ESPERANCA MG1 PI RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 598,212.64
  UB.ESPERANCA TR  230/69   kV UB.ESPERANCA   TR8 PI RBF FT TR  230/69   kV UB.ESPERANCA   TR8 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 659,177.78
  UB.ESPERANCA MG 230 kV UB.ESPERANCA MG1 PI RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 825,763.41
  UB.ESPERANCA MG 230 kV UB.ESPERANCA MG1 PI RB FT MG 230 kV UB.ESPERANCA MG1 PI 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,811,372.07
  US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 111,855.74

 

132 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR2 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 111,855.74
  US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 111,855.74
  US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR3 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 154,403.93
  US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR2 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 154,403.93
  US. FUNIL MC 115 kV TR 115/6,6 kV US. FUNIL TR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 154,403.93
  US. FUNIL MG 115 kV US. FUNIL MG1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 285,041.81
  US. FUNIL MG 115 kV US. FUNIL MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 393,467.27
  US. FUNIL MG 115 kV US. FUNIL MG1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 863,099.06
  US. L.GONZAGA RTL 500 kV 50 Mvar US. L.GONZAGA RTR1 PE RB FT RTL 500 kV 50 Mvar US. L.GONZAGA RTR1 PE 061/2001 IPCA RMELP REA 11954/2022     776,169.53
  US. L.GONZAGA RTL 500 kV 150 Mvar US. L.GONZAGA RT2 PE RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RMELP REA 11954/2022     2,328,508.60
  US. L.GONZAGA MC 69 kV RTN 69 kV 0 Mvar US. L.GONZAGA RTN2 PE RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,755.22
  US. L.GONZAGA MC 69 kV RTN 69 kV 0 Mvar US. L.GONZAGA RTN1 PE RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,755.22
  US. L.GONZAGA RTN 69 kV 0 Mvar US. L.GONZAGA RTN2 PE RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 14,361.37
  US. L.GONZAGA RTN 69 kV 0 Mvar US. L.GONZAGA RTN1 PE RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 14,361.37
  US. L.GONZAGA MG 500 kV US. L.GONZAGA MG1 PE RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 443/2011 15/11/2016 14/11/2033 15,903.68
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB1 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 31/10/2013 30/10/2043 16,599.11
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 8/11/2013 7/11/2043 16,609.94
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 8/11/2013 7/11/2043 16,609.94
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2043 16,638.32
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 643/2014 21/02/2014 20/02/2044 25,986.01
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB1 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 31/10/2013 30/10/2043 33,198.25
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2043 33,276.64
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 643/2014 21/02/2014 20/02/2044 47,951.46
  US. L.GONZAGA MC 500 kV RTL 500 kV 100 MVAr US. L.GONZAGA RT3 PE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 643/2014 14/06/2013 13/06/2043 49,233.81
  US. L.GONZAGA MC 500 kV RTL 500 kV 100 MVAr US. L.GONZAGA RT4 PE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RMEL REN 643/2014 11/7/2013 10/7/2043 49,343.27
  US. L.GONZAGA MC 500 kV RTL 500 kV 150 Mvar US. L.GONZAGA RT1 PE RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RMEL REN 643/2014 13/09/2013 12/9/2043 49,602.76
  US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR3 PE DIT   061/2001 IPCA RMEL REN 643/2014 25/10/2013 24/10/2043 49,773.05
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 22/11/2013 21/11/2043 49,886.57
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 29/11/2013 28/11/2043 49,914.96
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RMEL REN 643/2014 13/12/2013 12/12/2043 49,971.73
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RMEL REN 643/2014 15/02/2014 14/02/2044 72,831.82
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB6 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 28/02/2014 27/02/2044 72,906.92
  US. L.GONZAGA MG 500 kV US. L.GONZAGA MG1 PE RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2029 97,015.49
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBNI REA 5861/2016 6/9/2015 5/9/2030 100,412.34
  US. L.GONZAGA RTL 500 kV 40 Mvar US. L.GONZAGA RTR2 PE RB FT RTL 500 kV 40 Mvar US. L.GONZAGA RTR2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 249,484.75
  US. L.GONZAGA MC 500 kV RTL 500 kV 150 Mvar US. L.GONZAGA RT2 PE RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  US. L.GONZAGA MC 500 kV RTL 500 kV 150 Mvar US. L.GONZAGA RT1 PE RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  US. L.GONZAGA MC 500 kV RTL 500 kV 100 MVAr US. L.GONZAGA RT4 PE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  US. L.GONZAGA MC 500 kV RTL 500 kV 100 MVAr US. L.GONZAGA RT3 PE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 261,363.40
  US. L.GONZAGA RTL 500 kV 50 Mvar US. L.GONZAGA RTR1 PE RB FT RTL 500 kV 50 Mvar US. L.GONZAGA RTR1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 268,494.05
  US. L.GONZAGA RTL 500 kV 100 MVAr US. L.GONZAGA RT4 PE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,542.32
  US. L.GONZAGA RTL 500 kV 100 MVAr US. L.GONZAGA RT3 PE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 327,542.32
  US. L.GONZAGA RTL 500 kV 50 Mvar US. L.GONZAGA RTR1 PE RB FT RTL 500 kV 50 Mvar US. L.GONZAGA RTR1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 370,625.00
  US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR3 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR2 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR1 PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB6 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB2 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB1 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE RB FT LT 500 kV US. L.GONZAGA /MILAGRES C-1 PE/CE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR3 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR2 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  US. L.GONZAGA MC 500 kV TR 16/500 kV US. L.GONZAGA TR1 PE DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB2 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB1 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE RB FT LT 500 kV US. L.GONZAGA /GARANHUNS II C-2 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV OLINDINA /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  US. L.GONZAGA RTL 500 kV 150 Mvar US. L.GONZAGA RT2 PE RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 805,482.14
  US. L.GONZAGA RTL 500 kV 150 Mvar US. L.GONZAGA RT1 PE RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 805,482.14
  US. L.GONZAGA RTL 500 kV 150 Mvar US. L.GONZAGA RT2 PE RB FT LT 500 kV US. L.GONZAGA /JUAZEIRO III C-1 PE/BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,111,875.01
  US. L.GONZAGA RTL 500 kV 150 Mvar US. L.GONZAGA RT1 PE RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,111,875.01
  US. L.GONZAGA EL 500 kV US. L.GONZAGA LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE RB FT LT 500 kV P. AFONSO IV /US. L.GONZAGA C-1 BA/PE 061/2001 IPCA RBNI REA 5745/2016 10/1/2020 10/1/2049 1,330,818.70
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB4 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBNI REA 5745/2016 13/03/2019 13/03/2050 1,367,022.20
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB5 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB3 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB2 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  US. L.GONZAGA IB 500 kV MG 500 kV US. L.GONZAGA MG1 PE IB1 RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  US. L.GONZAGA MG 500 kV US. L.GONZAGA MG1 PE RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,957,102.88
  US. L.GONZAGA RTL 500 kV 150 Mvar US. L.GONZAGA RT1 PE RB FT LT 500 kV US. L.GONZAGA /U.SOBRADINHO C-2 PE/BA 061/2001 IPCA RMELP REA 11954/2022     2,328,508.60
  US. L.GONZAGA MG 500 kV US. L.GONZAGA MG1 PE RB FT MG 500 kV US. L.GONZAGA MG1 PE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,701,554.36
  USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 7/2/2014 6/2/2028 20,465.40
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBNI REA 4809/2014 22/08/2014 21/08/2042 20,979.48
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBNI REA 5861/2016 8/5/2016 7/5/2044 22,090.37
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBNI REA 5861/2016 8/5/2016 7/5/2044 22,090.37
  USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 8/7/2013 7/7/2030 25,103.13
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR2 AL DIT   061/2001 IPCA RMEL REN 643/2014 14/03/2013 13/03/2043 32,573.86

 

133 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 25/05/2013 24/05/2043 32,768.47
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR6 AL DIT   061/2001 IPCA RCDM REA 5861/2016 22/08/2014 21/08/2042 34,153.74
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR5 AL DIT   061/2001 IPCA RCDM REA 5484/2015 22/08/2014 21/08/2042 34,153.74
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR4 AL DIT   061/2001 IPCA RCDM REA 5484/2015 22/08/2014 21/08/2042 34,153.74
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR3 AL DIT   061/2001 IPCA RCDM REA 5484/2015 22/08/2014 21/08/2042 34,153.74
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR2 AL DIT   061/2001 IPCA RCDM REA 5484/2015 22/08/2014 21/08/2042 34,153.74
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR1 AL DIT   061/2001 IPCA RCDM REA 5484/2015 22/08/2014 21/08/2042 34,153.74
  USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 20/12/2015 19/12/2029 48,513.42
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR3 AL DIT   061/2001 IPCA RMEL REN 643/2014 8/3/2013 7/3/2043 48,836.46
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB3 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 24/05/2013 23/05/2043 49,148.67
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 443/2011 7/5/2014 6/5/2044 53,092.61
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 443/2011 7/5/2014 6/5/2044 53,092.61
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 7/5/2014 6/5/2044 66,584.83
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB2 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 9/5/2014 8/5/2044 73,311.27
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB4 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RMEL REN 643/2014 14/05/2014 13/05/2044 73,340.16
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR6 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR5 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR4 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR3 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR2 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 431,403.84
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB6 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB5 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB4 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB3 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB2 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 457,811.69
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 488,791.66
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR6 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR5 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR4 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR3 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR2 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR1 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 595,503.15
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB6 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB5 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB4 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB3 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB2 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 631,956.14
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 674,720.41
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR6 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,306,279.44
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR5 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,306,279.44
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR4 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,306,279.44
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR3 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,306,279.44
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR2 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,306,279.44
  USINA XINGO MC 500 kV TR 18/500 kV USINA XINGO TR1 AL DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,306,279.44
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB6 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB5 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB4 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB3 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB2 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  USINA XINGO IB 500 kV MG 500 kV USINA XINGO MG1 AL IB1 RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,386,241.73
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /MESSIAS C-1 AL RB FT LT 500 kV USINA XINGO /MESSIAS C-1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,480,048.26
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV USINA XINGO /JARDIM C-1 AL/SE RB FT LT 500 kV USINA XINGO /JARDIM C-1 AL/SE 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,480,048.26
  USINA XINGO EL 500 kV USINA XINGO LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL RB FT LT 500 kV P. AFONSO IV /USINA XINGO C-1 BA/AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,480,048.26
  USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,058,687.46
  USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,841,780.14
  USINA XINGO MG 500 kV USINA XINGO MG1 AL RB FT MG 500 kV USINA XINGO MG1 AL 061/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,233,651.31
  ZEBU EL 69 kV ZEBU LT 69 kV ZEBU /XINGO C-1 AL DIT   061/2001 IPCA RMEL REN 443/2011 11/11/2015 10/11/2038 6,867.60
  ZEBU MG 230 kV ZEBU MG1 BA RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBNI REA 7761/2019 31/07/2015 30/07/2030 10,750.83
  ZEBU MG 230 kV ZEBU MG1 BA RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBNI REA 5677/2016 1/10/2021 1/10/2052 14,739.35
  ZEBU MG 230 kV ZEBU MG1 BA RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBNI REA 5677/2016 1/10/2021 1/10/2052 14,739.35
  ZEBU MG 138 kV ZEBU MG1 BA DIT   061/2001 IPCA RMEL REN 643/2014 27/11/2015 26/11/2032 17,368.92
  ZEBU TR 69/13,8 kV ZEBU TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,360.45
  ZEBU TR 69/13,8 kV ZEBU TR3 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 39,148.32
  ZEBU IB 69 kV MG 138 kV ZEBU MG1 BA IB1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,855.57
  ZEBU EL 13,8 kV ZEBU  DIST4 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  ZEBU EL 13,8 kV ZEBU  DIST3 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  ZEBU EL 13,8 kV ZEBU  DIST2 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  ZEBU EL 13,8 kV ZEBU  DIST1 DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,992.54
  ZEBU MG 230 kV ZEBU MG1 BA RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBNI REA 5677/2016 1/10/2021 1/10/2053 55,626.61
  ZEBU MC 69 kV TR 69/13,8 kV ZEBU TR3 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ZEBU MC 69 kV TR 138/69 kV ZEBU TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 65,250.20
  ZEBU TT 69/0 kV ZEBU TT1 AL DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 73,671.61
  ZEBU EL 69 kV ZEBU LT 69 kV ZEBU /XINGO C-1 AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ZEBU EL 69 kV ZEBU LT 69 kV ZEBU /MOXOTO C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ZEBU EL 69 kV ZEBU LT 69 kV ZEBU /ITAPARICA C-1 BA/PE DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ZEBU EL 69 kV ZEBU LT 69 kV ABAIXADORA /ZEBU C-1 BA/AL DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 76,282.25
  ZEBU MC 69 kV TT 69/0 kV ZEBU TT1 AL DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 84,502.05
  ZEBU TR 138/69 kV ZEBU TR6 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 89,785.94
  ZEBU TR 138/69 kV ZEBU TR1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 89,785.94

 

134 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  ZEBU TT 69/13,8 kV ZEBU TA1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 92,062.91
  ZEBU MC 69 kV TT 69/0 kV ZEBU TT2 AL DIT   017/2009 IPCA RCDM REA 5677/2016 4/9/2021 4/9/2041 100,456.38
  ZEBU IB 69 kV MG 230 kV ZEBU MG1 BA IB1 DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 111,730.80
  ZEBU EL 138 kV ZEBU LT 138 kV USINA PA-II /ZEBU C-1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 121,238.08
  ZEBU TR 138/69 kV ZEBU TR1 BA DIT   061/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 123,939.11
  ZEBU MC 69 kV TR 230/69 kV ZEBU TR2 AL RBF FT TR 230/69 kV ZEBU TR2 BA 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 134,238.92
  ZEBU MC 69 kV TR 230/69 kV ZEBU TR1 AL RBF FT TR 230/69 kV ZEBU TR1 BA 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 134,238.92
  ZEBU EL 69 kV ZEBU  D. GOUVEIA C2 DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 168,277.09
ELETRONORTE ZEBU EL 69 kV ZEBU  D. GOUVEIA C1 DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 168,277.09
  ZEBU EL 69 kV ZEBU  BARRO VERMELHO DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 168,277.09
  ZEBU EL 69 kV ZEBU  ADUTORA DIT   017/2009 IPCA RPEC CC 017/2009 3/8/2009 3/8/2039 168,277.09
  ZEBU MC 69 kV TR 230/69 kV ZEBU TR3 AL RBF FT TR 230/69 kV ZEBU TR3 AL 017/2009 IPCA RBNI REA 5677/2016 27/09/2021 27/09/2043 234,312.30
  ZEBU TT 69/0 kV ZEBU TT2 AL DIT   017/2009 IPCA RCDM REA 5677/2016 4/9/2021 4/9/2051 256,317.26
  ZEBU IB 230 kV MG 230 kV ZEBU MG1 BA IB1 RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 301,620.41
  ZEBU MC 230 kV TR 230/69 kV ZEBU TR2 AL RBF FT TR 230/69 kV ZEBU TR2 BA 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 371,638.35
  ZEBU MC 230 kV TR 230/69 kV ZEBU TR1 AL RBF FT TR 230/69 kV ZEBU TR1 BA 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 371,638.35
  ZEBU MG 138 kV ZEBU MG1 BA DIT   061/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 377,402.33
  ZEBU MC 230 kV TR 230/69 kV ZEBU TR3 AL RBF FT TR 230/69 kV ZEBU TR3 AL 017/2009 IPCA RBNI REA 5677/2016 27/09/2021 27/09/2044 568,899.05
  ZEBU EL 230 kV ZEBU LT 230 kV P.AFONSO III /ZEBU C-2 AL RB FT LT 230 kV P.AFONSO III /ZEBU C-2 AL/BA 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 613,835.26
  ZEBU EL 230 kV ZEBU LT 230 kV P.AFONSO III /ZEBU C-1 AL RB FT LT 230 kV P.AFONSO III /ZEBU C-1 AL 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 613,835.26
  ZEBU MG 230 kV ZEBU MG1 BA RB FT MG 230 kV ZEBU MG1 BA 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 906,359.40
  ZEBU TR 230/69 kV ZEBU TR2 AL RBF FT TR 230/69 kV ZEBU TR2 BA 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 1,136,840.37
  ZEBU TR 230/69 kV ZEBU TR1 AL RBF FT TR 230/69 kV ZEBU TR1 BA 017/2009 IPCA RBL CC 017/2009 3/8/2009 3/8/2039 1,136,840.37
  ZEBU TR 230/69 kV ZEBU TR3 AL RBF FT TR 230/69 kV ZEBU TR3 AL 017/2009 IPCA RBNI REA 5677/2016 27/09/2021 27/09/2055 1,300,605.25
  ABUNA MC 69 kV RTN 69 kV 0 Mvar ABUNA RN2 RO RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,653.70
  ABUNA RTN 69 kV 0 Mvar ABUNA RN2 RO RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  ABUNA MG 230 kV ABUNA MG1 RO RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RMEL REN 443/2011 1/9/2016 31/08/2033 59,255.75
  ABUNA MG 230 kV ABUNA MG1 RO RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RBNI REA 3216/2011 12/1/2014 11/1/2042 72,554.04
  ABUNA MC 230 kV RTL 230 kV 30 Mvar ABUNA RT2 RO RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  ABUNA MC 230 kV RTL 230 kV 30 Mvar ABUNA RT1 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  ABUNA MC 138 kV TR 230/138 kV ABUNA TR1 RO RBF FT TR 230/138 kV ABUNA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,982.73
  ABUNA MC 230 kV RTB 230 kV 30 Mvar ABUNA RT4 RO RB FT RTB 230 kV 30 Mvar ABUNA RT4 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 142,539.96
  ABUNA MG 230 kV ABUNA MG1 RO RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RBNI REA 3216/2011 12/1/2014 11/1/2042 158,651.64
  ABUNA MC 230 kV TR 230/138 kV ABUNA TR2 RO RBF FT TR 230/138 kV ABUNA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 166,361.33
  ABUNA MC 230 kV TR 230/138 kV ABUNA TR1 RO RBF FT TR 230/138 kV ABUNA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 166,361.33
  ABUNA MG 230 kV ABUNA MG1 RO RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RBNI REA 5679/2016 18/12/2017 17/12/2047 219,160.63
  ABUNA MC 230 kV RTL 230 kV 30 Mvar ABUNA RT5 RO RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 225,484.36
  ABUNA MC 230 kV RTL 230 kV 30 Mvar ABUNA RT3 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 225,484.36
  ABUNA EL 230 kV ABUNA LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 233,216.46
  ABUNA EL 230 kV ABUNA LT 230 kV ABUNA /PORTO VELHO C-1 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 233,216.46
  ABUNA RTL 230 kV 30 Mvar ABUNA RT2 RO RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 262,121.78
  ABUNA RTL 230 kV 30 Mvar ABUNA RT1 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 262,121.78
  ABUNA RTB 230 kV 30 Mvar ABUNA RT4 RO RB FT RTB 230 kV 30 Mvar ABUNA RT4 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 262,121.78
  ABUNA TR 230/138 kV ABUNA TR2 RO RBF FT TR 230/138 kV ABUNA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 311,990.56
  ABUNA TR 230/138 kV ABUNA TR1 RO RBF FT TR 230/138 kV ABUNA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 311,990.56
  ABUNA MG 230 kV ABUNA MG1 RO RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 490,746.13
  ABUNA IB 138 kV MG 230 kV ABUNA MG1 RO IB1 DIT   058/2001 IPCA RCDM REA 3216/2011 12/1/2014 11/1/2045 530,895.83
  ABUNA MC 138 kV TR 230/138 kV ABUNA TR1 RO RBF FT TR 230/138 kV ABUNA TR1 RO 058/2001 IPCA RBNI REA 3216/2011 12/1/2014 11/1/2045 623,406.97
  ABUNA MC 138 kV TR 230/138 kV ABUNA TR2 RO RBF FT TR 230/138 kV ABUNA TR2 RO 058/2001 IPCA RBNI REA 3216/2011 12/1/2014 11/1/2045 623,473.68
  ABUNA IB 230 kV MG 230 kV ABUNA MG1 RO IB1 RB FT MG 230 kV ABUNA MG1 RO 058/2001 IPCA RBNI REA 3216/2011 12/1/2014 11/1/2043 674,890.05
  ABUNA RTL 230 kV 30 Mvar ABUNA RT5 RO RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 685,364.32
  ABUNA RTL 230 kV 30 Mvar ABUNA RT3 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 685,364.32
  ABUNA EL 230 kV ABUNA LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 688,118.00
  ABUNA EL 230 kV ABUNA LT 230 kV ABUNA /PORTO VELHO C-2 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 688,118.00
  ABUNA RTL 230 kV 0 Mvar ABUNA RLR RO RB FT RTL 230 kV 30 Mvar ABUNA RLR RO 058/2001 IPCA RBNI REA 5679/2016 18/12/2017 17/12/2052 750,613.57
  ALTAMIRA TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBNI REA 4512/2014 7/4/2014 6/4/2038 8,438.06
  ALTAMIRA TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBNI REA 4512/2014 7/4/2014 6/4/2038 8,438.06
  ALTAMIRA RTL 230 kV 30 Mvar ALTAMIRA RT1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2041 25,143.33
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REN 443/2011 1/10/2018 30/09/2049 40,854.98
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2043 48,939.58
  ALTAMIRA MC 69 kV TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  ALTAMIRA EL 69 kV ALTAMIRA  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,772.00
  ALTAMIRA EL 69 kV ALTAMIRA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 87,456.92
  ALTAMIRA MC 230 kV RTL 230 kV 30 Mvar ALTAMIRA RT1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2043 110,649.80
  ALTAMIRA MC 230 kV RTB 230 kV 30 Mvar ALTAMIRA RT2 PA RB FT RTB 230 kV 30 Mvar ALTAMIRA RT2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 142,539.96
  ALTAMIRA EL 69 kV ALTAMIRA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 153,345.43
  ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 156,815.21
  ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 156,815.21
  ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 174,104.70
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2045 195,369.23
  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 233,216.46
  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 233,216.46
  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 258,929.48
  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 258,929.48
  ALTAMIRA RTB 230 kV 30 Mvar ALTAMIRA RT2 PA RB FT RTB 230 kV 30 Mvar ALTAMIRA RT2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 262,121.78
  ALTAMIRA IB 69 kV MG 230 kV ALTAMIRA MG1 PA IB1 DIT   058/2001 IPCA RCDM REA 3361/2012 21/06/2016 20/06/2048 296,659.30
  ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 305,272.15
  ALTAMIRA MC 69 kV TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2046 311,085.27
  ALTAMIRA TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 312,702.63
  ALTAMIRA TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 312,702.63
  ALTAMIRA TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 347,179.31
  ALTAMIRA EL 69 kV ALTAMIRA  CELPA C2 DIT   058/2001 IPCA RCDM REN 443/2011 1/10/2018 30/09/2046 356,737.48
  ALTAMIRA EL 69 kV ALTAMIRA  DIST1 DIT   058/2001 IPCA RCDM REA 3361/2012 21/06/2016 20/06/2046 402,057.35
  ALTAMIRA MC 69 kV TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBNI REA 3361/2012 11/7/2016 10/7/2045 404,737.94
  ALTAMIRA MC 69 kV TR 230/69 kV ALTAMIRA TR3 PA RBF FT TR 230/69 kV ALTAMIRA TR3 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2046 406,909.83

 

135 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  ALTAMIRA RTL 230 kV 30 Mvar ALTAMIRA RT1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 411,079.54
  ALTAMIRA MC 230 kV RTB 230 kV 30 Mvar ALTAMIRA RT2 PA RB FT RTB 230 kV 30 Mvar ALTAMIRA RT2 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2047 431,306.91
  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 454,002.45
  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 454,002.45
  ALTAMIRA RTL 230 kV 30 Mvar ALTAMIRA RT1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 456,402.66
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 522,327.11
  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2048 545,281.07
  ALTAMIRA EL 230 kV ALTAMIRA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2045 551,955.61
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 579,915.70
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2043 589,678.83
  ALTAMIRA TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 608,738.17
  ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF2 PA RBF FT TR 230/69 kV ALTAMIRA TF2 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2047 679,986.64
  ALTAMIRA IB 230 kV MG 230 kV ALTAMIRA MG1 PA IB1 RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2049 749,840.41
  ALTAMIRA RTL 230 kV 30 Mvar ALTAMIRA RT1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 800,248.48
  ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TR3 PA RBF FT TR 230/69 kV ALTAMIRA TR3 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2046 959,937.71
  ALTAMIRA MG 230 kV ALTAMIRA MG1 PA RB FT MG 230 kV ALTAMIRA MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,016,814.10
  ALTAMIRA MC 230 kV TR 230/69 kV ALTAMIRA TF1 PA RBF FT TR 230/69 kV ALTAMIRA TF1 PA 058/2001 IPCA RBNI REA 3361/2012 11/7/2016 10/7/2045 1,177,987.88
  ALTAMIRA TR 230/69 kV ALTAMIRA TR3 PA RBF FT TR 230/69 kV ALTAMIRA TR3 PA 058/2001 IPCA RBNI REA 4857/2014 19/12/2016 18/12/2050 1,219,087.49
  ALUMAR EL 230 kV ALUMAR LT 230 kV SAO LUIS II /ALUMAR C-2 MA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 241,776.23
  ALUMAR EL 230 kV ALUMAR LT 230 kV SAO LUIS II /ALUMAR C-1 MA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 241,776.23
  ARARAQUARA 2 IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB9 RB FT MG 500 kV ARARAQUARA 2 MG2 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 255,583.00
  ARARAQUARA 2 IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB8 RB FT MG 500 kV ARARAQUARA 2 MG2 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 255,583.00
  ARARAQUARA 2 IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB7 RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 255,583.00
  ARARAQUARA 2 IB 500 kV MG 500 kV ARARAQUARA 2 MG2 SP IB6 RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 255,583.00
  ARARAQUARA 2 MC 500 kV BF 500 kV 0 Mvar ARARAQUARA 2 GF4 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 589,019.14
  ARARAQUARA 2 MC 500 kV BF 500 kV 0 Mvar ARARAQUARA 2 GF3 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 589,019.14
  ARARAQUARA 2 MC 500 kV BF 500 kV 0 Mvar ARARAQUARA 2 GF2 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 589,019.14
  ARARAQUARA 2 MC 500 kV BF 500 kV 0 Mvar ARARAQUARA 2 GF1 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 589,019.14
  ARARAQUARA 2 MC 500 kV CV 600/600 kV ARARAQUARA 2 CC2 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 663,332.20
  ARARAQUARA 2 MC 500 kV CV 600/600 kV ARARAQUARA 2 CC1 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 663,332.20
  ARARAQUARA 2 BF 500 kV 0 Mvar ARARAQUARA 2 GF4 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 8,292,369.55
  ARARAQUARA 2 BF 500 kV 0 Mvar ARARAQUARA 2 GF3 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 8,292,369.55
  ARARAQUARA 2 BF 500 kV 0 Mvar ARARAQUARA 2 GF2 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 8,292,369.55
  ARARAQUARA 2 BF 500 kV 0 Mvar ARARAQUARA 2 GF1 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 8,292,369.55
  ARARAQUARA 2 CV 600/600 kV ARARAQUARA 2 CC2 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 52,636,378.55
  ARARAQUARA 2 CV 600/600 kV ARARAQUARA 2 CC1 SP RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 52,636,378.55
  ARIQUEMES MC 69 kV TR 230/69 kV ARIQUEMES TR2 RO RBF FT TR 230/69 kV ARIQUEMES TR2 RO 058/2001 IPCA RBNI REA 3470/2012 8/4/2015 7/4/2055 7,319.38
  ARIQUEMES MC 69 kV TR 230/69 kV ARIQUEMES TR1 RO RBF FT TR 230/69 kV ARIQUEMES TR1 RO 058/2001 IPCA RBNI REA 3470/2012 8/4/2015 7/4/2055 7,319.38
  ARIQUEMES MC 230 kV RTN 230 kV 0,1 Mvar ARIQUEMES RN1 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,653.70
  ARIQUEMES RTN 230 kV 0,1 Mvar ARIQUEMES RN1 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBNI REA 5678/2016 5/3/2018 4/3/2049 19,277.77
  ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBNI REA 5678/2016 5/3/2018 4/3/2049 19,277.77
  ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RMEL REN 443/2011 1/9/2016 31/08/2033 23,542.43
  ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBNI REA 5678/2016 5/3/2018 4/3/2041 43,739.11
  ARIQUEMES MC 69 kV TR 230/69 kV ARIQUEMES TR2 RO RBF FT TR 230/69 kV ARIQUEMES TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  ARIQUEMES MC 69 kV TR 230/69 kV ARIQUEMES TR1 RO RBF FT TR 230/69 kV ARIQUEMES TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBNI REA 5678/2016 5/3/2018 4/3/2049 74,669.71
  ARIQUEMES EL 69 kV ARIQUEMES  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,772.00
  ARIQUEMES MC 230 kV RTL 230 kV 20 Mvar ARIQUEMES RT1 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBNI REA 7814/2019 13/05/2021 13/05/2052 122,904.69
  ARIQUEMES IB 230 kV MG 230 kV ARIQUEMES MG1 RO IB1 RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  ARIQUEMES MC 230 kV TR 230/69 kV ARIQUEMES TR2 RO RBF FT TR 230/69 kV ARIQUEMES TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  ARIQUEMES MC 230 kV TR 230/69 kV ARIQUEMES TR1 RO RBF FT TR 230/69 kV ARIQUEMES TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  ARIQUEMES MC 230 kV RTL 230 kV 0 Mvar ARIQUEMES RT3 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 220,163.20
  ARIQUEMES RTL 230 kV 20 Mvar ARIQUEMES RT1 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 245,934.80
  ARIQUEMES EL 230 kV ARIQUEMES LT 230 kV SAMUEL /ARIQUEMES C-1 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  ARIQUEMES EL 230 kV ARIQUEMES LT 230 kV ARIQUEMES /JARU C-1 RO RB FT LT 230 kV ARIQUEMES /JARU C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  ARIQUEMES TR 230/69 kV ARIQUEMES TR2 RO RBF FT TR 230/69 kV ARIQUEMES TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 312,702.63
  ARIQUEMES TR 230/69 kV ARIQUEMES TR1 RO RBF FT TR 230/69 kV ARIQUEMES TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 312,702.63
  ARIQUEMES MC 69 kV TR 230/69 kV ARIQUEMES TR3 RO RBF FT TR 230/69 kV ARIQUEMES TR3 RO 058/2001 IPCA RBNI REA 5678/2016 5/3/2018 4/3/2041 320,144.36
  ARIQUEMES MG 230 kV ARIQUEMES MG1 RO RB FT MG 230 kV ARIQUEMES MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 475,224.69
  ARIQUEMES RTB 230 kV 20,00 Mvar ARIQUEMES RB1 RO RB FT RTB 230 kV 20 Mvar ARIQUEMES RB1 RO 058/2001 IPCA RBNI REA 7814/2019 13/05/2021 13/05/2056 491,396.17
  ARIQUEMES RTL 230 kV 0 Mvar ARIQUEMES RT3 RO RB FT RTL 230 kV 20 Mvar ARIQUEMES RT3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 663,495.71
  ARIQUEMES EL 230 kV ARIQUEMES LT 230 kV SAMUEL /ARIQUEMES C-3 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 671,879.23
  ARIQUEMES EL 230 kV ARIQUEMES LT 230 kV ARIQUEMES /JI-PARANA C-3 RO RB FT LT 230 kV ARIQUEMES /JI-PARANA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 671,879.23
  ARIQUEMES MC 230 kV TR 230/69 kV ARIQUEMES TR3 RO RBF FT TR 230/69 kV ARIQUEMES TR3 RO 058/2001 IPCA RBNI REA 5678/2016 5/3/2018 4/3/2041 715,804.61
  ARIQUEMES MC 230 kV RTB 230 kV 20,00 Mvar ARIQUEMES RB1 RO RB FT RTB 230 kV 20 Mvar ARIQUEMES RB1 RO 058/2001 IPCA RBNI REA 7814/2019 13/05/2021 13/05/2045 981,864.55
  ARIQUEMES TR 230/69 kV ARIQUEMES TR3 RO RBF FT TR 230/69 kV ARIQUEMES TR3 RO 058/2001 IPCA RBNI REA 5678/2016 5/3/2018 4/3/2052 1,202,332.01
  BALSAS IB 69 kV MG 230 kV BALSAS MG1 MA IB1 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 22,891.67
  BALSAS MC 69 kV TT 69/0 kV BALSAS TT1 MA DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 27,713.71
  BALSAS MG 230 kV BALSAS MG1 MA RB FT MG 230 kV BALSAS MG1 MA 001/2009 IPCA RBNI REN 443/2011 16/08/2017 15/08/2048 34,934.92
  BALSAS MC 69 kV TR 230/69 kV BALSAS TR1 MA RBF FT TR 230/69 kV BALSAS TR1 MA 001/2009 IPCA RBNI REA 4745/2014 15/07/2016 15/07/2047 35,122.71
  BALSAS MG 230 kV BALSAS MG1 MA RB FT MG 230 kV BALSAS MG1 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2047 42,783.27
  BALSAS MC 69 kV TR 230/69 kV BALSAS TR1 MA RBF FT TR 230/69 kV BALSAS TR1 MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 47,422.00
  BALSAS EL 69 kV BALSAS  DIST4 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 48,120.25
  BALSAS EL 69 kV BALSAS  DIST3 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 48,120.25
  BALSAS EL 69 kV BALSAS  DIST2 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 48,120.25
  BALSAS EL 69 kV BALSAS  DIST1 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 48,120.25
  BALSAS MC 13,8 kV TR 230/69 kV BALSAS TR2 MA RBF FT TR 230/69 kV BALSAS TR2 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2046 67,926.98
  BALSAS TT 69/0 kV BALSAS TT1 MA DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 110,852.90
  BALSAS IB 230 kV MG 230 kV BALSAS MG1 MA IB1 RB FT MG 230 kV BALSAS MG1 MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 143,475.82
  BALSAS MG 230 kV BALSAS MG1 MA RB FT MG 230 kV BALSAS MG1 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2047 149,264.82
  BALSAS MC 230 kV TR 230/69 kV BALSAS TR1 MA RBF FT TR 230/69 kV BALSAS TR1 MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 259,475.55
  BALSAS EL 69 kV BALSAS  SE BALSAS III DIT   001/2009 IPCA RCDM REN 443/2011 16/08/2017 15/08/2045 292,612.45
  BALSAS EL 230 kV BALSAS LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA RB FT LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 299,005.74
  BALSAS TR 230/69 kV BALSAS TR1 MA RBF FT TR 230/69 kV BALSAS TR1 MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 373,471.07

 

136 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  BALSAS MC 69 kV TR 230/69 kV BALSAS TR2 MA RBF FT TR 230/69 kV BALSAS TR2 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2039 415,935.25
  BALSAS MC 230 kV TR 230/69 kV BALSAS TR2 MA RBF FT TR 230/69 kV BALSAS TR2 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2039 898,379.20
  BALSAS MG 230 kV BALSAS MG1 MA RB FT MG 230 kV BALSAS MG1 MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 949,603.61
  BALSAS TR 230/69 kV BALSAS TR2 MA RBF FT TR 230/69 kV BALSAS TR2 MA 001/2009 IPCA RBNI REA 4745/2014 23/06/2016 23/06/2050 1,972,899.98
  BARRA PEIXE EL 13,8 kV BARRA PEIXE  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  BARRA PEIXE EL 13,8 kV BARRA PEIXE  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,041.57
  BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2042 67,872.15
  BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2049 79,723.01
  BARRA PEIXE RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT RB FT RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT 058/2001 IPCA RMEL REN 443/2011 5/6/2017 4/6/2031 84,997.63
  BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2051 91,092.41
  BARRA PEIXE MC 230 kV RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT RB FT RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  BARRA PEIXE MC 230 kV RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT RB FT RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2050 127,672.71
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TRR1 MT RBF FT TR 230/138 kV BARRA PEIXE TRR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 150,568.41
  BARRA PEIXE IB 230 kV MG 230 kV BARRA PEIXE MG1 MT IB1 RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TRR1 MT RBF FT TR 230/138 kV BARRA PEIXE TRR1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 167,169.17
  BARRA PEIXE MC 230 kV RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,992.04
  BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBNI REA 2384/2010 28/11/2012 27/11/2040 176,123.51
  BARRA PEIXE BC 230 kV 35 Mvar BARRA PEIXE BC2 MT RB FT BC 230 kV 35 Mvar BARRA PEIXE BC2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 183,902.95
  BARRA PEIXE MC 230 kV RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 186,513.82
  BARRA PEIXE BC 230 kV 37 Mvar BARRA PEIXE BC3 MT RB FT BC 230 kV 37 Mvar BARRA PEIXE BC3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 189,042.91
  BARRA PEIXE EL 138 kV BARRA PEIXE  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 190,467.63
  BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 193,954.55
  BARRA PEIXE EL 138 kV BARRA PEIXE  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 211,467.43
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,563.91
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,563.91
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TRR1 MT RBF FT TR 230/138 kV BARRA PEIXE TRR1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 293,111.51
  BARRA PEIXE BC 230 kV 120 Mvar BARRA PEIXE BC1 MT RB FT BC 230 kV 120 Mvar BARRA PEIXE BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 297,870.64
  BARRA PEIXE MC 230 kV RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 327,030.08
  BARRA PEIXE RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT RB FT RTL 230 kV 20 MVAr BARRA PEIXE RT3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 328,076.01
  BARRA PEIXE RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT RB FT RTL 230 kV 20 MVAr BARRA PEIXE RT1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 328,076.01
  BARRA PEIXE RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 328,076.01
  BARRA PEIXE RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 364,247.67
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 451,656.75
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-1 GO/MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 483,168.97
  BARRA PEIXE EL 230 kV BARRA PEIXE LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 483,168.97
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 501,453.66
  BARRA PEIXE IB 138 kV MG 230 kV BARRA PEIXE MG1 MT IB1 DIT   058/2001 IPCA RCDM REA 2384/2010 24/10/2012 23/10/2043 525,102.71
  BARRA PEIXE MC 138 kV TR 230/138 kV BARRA PEIXE TR5 MT RBF FT TR 230/138 kV BARRA PEIXE TR5 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2039 545,656.22
  BARRA PEIXE MC 138 kV TR 230/138 kV BARRA PEIXE TR4 MT RBF FT TR 230/138 kV BARRA PEIXE TR4 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2039 545,656.22
  BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 621,683.67
  BARRA PEIXE RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT RB FT RTB 230 kV 20 MVAr BARRA PEIXE RT2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 638,665.53
  BARRA PEIXE MC 138 kV TR 230/138 kV BARRA PEIXE TR2 MT RBF FT TR 230/138 kV BARRA PEIXE TR2 MT 058/2001 IPCA RBNI REA 2384/2010 24/10/2012 23/10/2044 646,408.22
  BARRA PEIXE MC 138 kV TR 230/138 kV BARRA PEIXE TR3 MT RBF FT TR 230/138 kV BARRA PEIXE TR3 MT 058/2001 IPCA RBNI REA 2384/2010 28/11/2012 27/11/2042 648,655.30
  BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR5 MT RBF FT TR 230/138 kV BARRA PEIXE TR5 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2042 669,845.83
  BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR4 MT RBF FT TR 230/138 kV BARRA PEIXE TR4 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2042 669,845.83
  BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 690,226.71
  BARRA PEIXE EL 138 kV BARRA PEIXE  DIST2 DIT   058/2001 IPCA RCDM REA 2384/2010 28/11/2012 27/11/2043 693,897.16
  BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR2 MT RBF FT TR 230/138 kV BARRA PEIXE TR2 MT 058/2001 IPCA RBNI REA 2384/2010 24/10/2012 23/10/2042 867,785.08
  BARRA PEIXE MC 230 kV TR 230/138 kV BARRA PEIXE TR3 MT RBF FT TR 230/138 kV BARRA PEIXE TR3 MT 058/2001 IPCA RBNI REA 2384/2010 28/11/2012 27/11/2042 870,432.81
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TR1 MT RBF FT TR 230/138 kV BARRA PEIXE TR1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 879,240.12
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TR2 MT RBF FT TR 230/138 kV BARRA PEIXE TR2 MT 058/2001 IPCA RBNI REA 2384/2010 24/10/2012 23/10/2046 987,431.60
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TR3 MT RBF FT TR 230/138 kV BARRA PEIXE TR3 MT 058/2001 IPCA RBNI REA 2384/2010 28/11/2012 27/11/2046 989,731.46
  BARRA PEIXE MG 230 kV BARRA PEIXE MG1 MT RB FT MG 230 kV BARRA PEIXE MG1 MT 058/2001 IPCA RBNI REA 2384/2010 24/10/2012 23/10/2039 1,124,525.65
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TR5 MT RBF FT TR 230/138 kV BARRA PEIXE TR5 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2052 1,503,146.16
  BARRA PEIXE TR 230/138 kV BARRA PEIXE TR4 MT RBF FT TR 230/138 kV BARRA PEIXE TR4 MT 058/2001 IPCA RBNI REA 5687/2016 13/08/2018 13/08/2052 1,503,146.16
  BOA VISTA MG 230 kV BOA VISTA MG2 RR RB FT MG 230 kV BOA VISTA MG2 RR 058/2001 IPCA RBNI DSP 3687/2017 5/7/2015 5/7/2047 17,965.49
  BOA VISTA MC 69 kV TR 230/69 kV BOA VISTA TR2 RR RBF FT TR 230/69 kV BOA VISTA TR2 RR 058/2001 IPCA RBNI REA 3587/2012 1/6/2016 31/05/2044 87,423.73
  BOA VISTA MC 69 kV TR 230/69 kV BOA VISTA TR1 RR RBF FT TR 230/69 kV BOA VISTA TR1 RR 058/2001 IPCA RBNI REA 3587/2012 1/6/2016 31/05/2044 87,474.34
  BOA VISTA MC 69 kV TR 230/69 kV BOA VISTA TR3 RR DIT   058/2001 IPCA RCDM DSP 3687/2017 5/7/2015 17/06/2038 246,176.02
  BOA VISTA MG 230 kV BOA VISTA MG2 RR RB FT MG 230 kV BOA VISTA MG2 RR 058/2001 IPCA RBNI REA 3587/2012 1/6/2016 31/05/2044 450,097.84
  BOA VISTA MC 230 kV TR 230/69 kV BOA VISTA TR3 RR DIT   058/2001 IPCA RCDM DSP 3687/2017 5/7/2015 17/06/2039 598,906.93
  BOA VISTA MC 230 kV TR 230/69 kV BOA VISTA TR1 RR RBF FT TR 230/69 kV BOA VISTA TR1 RR 058/2001 IPCA RBNI REA 3587/2012 1/6/2016 31/05/2046 615,694.67
  BOA VISTA MC 230 kV TR 230/69 kV BOA VISTA TR2 RR RBF FT TR 230/69 kV BOA VISTA TR2 RR 058/2001 IPCA RBNI REA 3587/2012 1/6/2016 31/05/2046 615,720.55
  BOA VISTA IB 230 kV MG 230 kV BOA VISTA MG2 RR IB1 RB FT MG 230 kV BOA VISTA MG2 RR 058/2001 IPCA RBNI REA 3587/2012 1/6/2016 31/05/2048 795,702.45
  BOA VISTA TR 230/69 kV BOA VISTA TR3 RR DIT   058/2001 IPCA RCDM DSP 3687/2017 5/7/2015 17/06/2050 1,459,111.30
  C. MAGALHAES MC 13,8 kV TR 138/13,8 kV C. MAGALHAES TR1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,769.23
  C. MAGALHAES EL 13,8 kV C. MAGALHAES  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  C. MAGALHAES EL 13,8 kV C. MAGALHAES  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  C. MAGALHAES TR 138/13,8 kV C. MAGALHAES TR1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 81,648.33
  C. MAGALHAES TR 138/13,8 kV C. MAGALHAES TR1 MT DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 90,650.38
  C. MAGALHAES MC 138 kV RTB 138 kV 5 Mvar C. MAGALHAES RT2 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,223.18
  C. MAGALHAES MC 138 kV RTB 138 kV 5 Mvar C. MAGALHAES RT1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,223.18
  C. MAGALHAES MC 138 kV TR 138/13,8 kV C. MAGALHAES TR1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 116,982.73
  C. MAGALHAES EL 138 kV C. MAGALHAES LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,404.50
  C. MAGALHAES EL 138 kV C. MAGALHAES LT 138 kV C. MAGALHAES /RONDONOPOLIS C-1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,404.50
  C. MAGALHAES RTB 138 kV 5 Mvar C. MAGALHAES RT2 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 142,512.93
  C. MAGALHAES RTB 138 kV 5 Mvar C. MAGALHAES RT1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 142,512.93
  C. MAGALHAES RTB 138 kV 5 Mvar C. MAGALHAES RT2 MT DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 158,225.53
  C. MAGALHAES RTB 138 kV 5 Mvar C. MAGALHAES RT1 MT DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 158,225.53
  C. MAGALHAES RTB 138 kV 5 Mvar C. MAGALHAES RT2 MT DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 277,429.89

 

137 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  C. MAGALHAES MG 138 kV C. MAGALHAES MG1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 352,389.14
  CAMETA BC 13,8 kV 2,13 Mvar CAMETA BC2 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 33,806.48
  CAMETA BC 13,8 kV 2,13 Mvar CAMETA BC1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 33,806.48
  CAMETA IB 13,8 kV MG 69 kV CAMETA MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,890.81
  CAMETA BC 13,8 kV 2,13 Mvar CAMETA BC2 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 37,533.78
  CAMETA BC 13,8 kV 2,13 Mvar CAMETA BC1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 37,533.78
  CAMETA IB 13,8 kV MG 69 kV CAMETA MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 38,737.66
  CAMETA MC 13,8 kV TR 34,5/13,8 kV CAMETA TR1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,769.23
  CAMETA MC 13,8 kV TR 34,5/13,8 kV CAMETA TR1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 56,366.74
  CAMETA EL 13,8 kV CAMETA  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  CAMETA EL 13,8 kV CAMETA  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  CAMETA EL 13,8 kV CAMETA  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  CAMETA EL 13,8 kV CAMETA  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,041.57
  CAMETA EL 13,8 kV CAMETA  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,041.57
  CAMETA EL 13,8 kV CAMETA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,041.57
  CAMETA BC 13,8 kV 2,13 Mvar CAMETA BC2 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 65,811.08
  CAMETA BC 13,8 kV 2,13 Mvar CAMETA BC1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 65,811.08
  CAMETA IB 13,8 kV MG 69 kV CAMETA MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 67,921.94
  CAMETA MC 13,8 kV BC 13,8 kV 2,13 Mvar CAMETA BC2 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  CAMETA MC 13,8 kV BC 13,8 kV 2,13 Mvar CAMETA BC1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  CAMETA MC 13,8 kV BC 13,8 kV 2,13 Mvar CAMETA BC2 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 91,159.85
  CAMETA MC 13,8 kV BC 13,8 kV 2,13 Mvar CAMETA BC1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 91,159.85
  CAMETA MC 13,8 kV TR 34,5/13,8 kV CAMETA TR1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 98,832.45
  CAMETA EL 13,8 kV CAMETA  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 110,535.98
  CAMETA EL 13,8 kV CAMETA  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 110,535.98
  CAMETA EL 13,8 kV CAMETA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 110,535.98
  CAMETA MC 13,8 kV BC 13,8 kV 2,13 Mvar CAMETA BC2 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 159,838.09
  CAMETA MC 13,8 kV BC 13,8 kV 2,13 Mvar CAMETA BC1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 159,838.09
  CARAJAS IB 230 kV MG 230 kV CARAJAS MG1 PA IB1 RB FT MG 230 kV CARAJAS MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  CARAJAS BC 230 kV 30 MVAr CARAJAS BC1 PA RB FT BC 230 kV 30 MVAr CARAJAS BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,644.72
  CARAJAS MC 230 kV BC 230 kV 30 MVAr CARAJAS BC1 PA RB FT BC 230 kV 30 MVAr CARAJAS BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 198,093.56
  CARAJAS EL 230 kV CARAJAS LT 230 kV CARAJAS /MARABA C-1 PA RB FT LT 230 kV CARAJAS /MARABA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  CARAJAS EL 230 kV CARAJAS LT 230 kV CARAJAS /INTEGRADORA C-1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  CARAJAS EL 230 kV CARAJAS  CONS1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  CARAJAS EL 230 kV CARAJAS LT 230 kV CARAJAS /INTEGRADORA C-2 PA RB FT LT 230 kV CARAJAS /INTEGRADORA C-2 PA 058/2001 IPCA RBNI REA 4658/2014 2/9/2013 31/12/2042 297,383.28
  CARAJAS MG 230 kV CARAJAS MG1 PA RB FT MG 230 kV CARAJAS MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 453,275.90
  CASTANHAL MG 230 kV CASTANHAL MG2 PA RB FT MG 230 kV CASTANHAL MG2 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2033 580,417.29
  CASTANHAL EL 230 kV CASTANHAL LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2042 962,575.13
  CASTANHAL EL 230 kV CASTANHAL LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2042 962,634.22
  COELHO NETO RTL 230 kV 5 MVAr COELHO NETO RT2 MA RB FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 44,285.08
  COELHO NETO RTL 230 kV 5 MVAr COELHO NETO RT2 MA RB FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 49,167.69
  COELHO NETO RTL 230 kV 5 MVAr COELHO NETO RT2 MA RB FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 86,209.77
  COELHO NETO MC 230 kV RTL 230 kV 5 MVAr COELHO NETO RT2 MA RB FT RTL 230 kV 5 MVAr COELHO NETO RT2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  COELHO NETO MC 230 kV RTL 230 kV 20 MVAr COELHO NETO RT1 MA RB FT RTL 230 kV 20 MVAr COELHO NETO RT1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  COELHO NETO IB 230 kV MG 230 kV COELHO NETO MG1 MA IB1 RB FT MG 230 kV COELHO NETO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,664.78
  COELHO NETO MC 230 kV TR 230/69 kV COELHO NETO TF2 MA RBF FT TR 230/69 kV COELHO NETO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 166,361.33
  COELHO NETO MC 230 kV TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 166,361.33
  COELHO NETO MC 230 kV TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 184,703.31
  COELHO NETO EL 230 kV COELHO NETO LT 230 kV PERITORO /COELHO NETO C-1 MA RB FT LT 230 kV PERITORO /COELHO NETO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,776.23
  COELHO NETO EL 230 kV COELHO NETO LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,776.23
  COELHO NETO RTL 230 kV 20 MVAr COELHO NETO RT1 MA RB FT RTL 230 kV 20 MVAr COELHO NETO RT1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 245,934.80
  COELHO NETO MC 230 kV TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 323,855.57
  COELHO NETO TR 230/69 kV COELHO NETO TF2 MA RBF FT TR 230/69 kV COELHO NETO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 326,630.04
  COELHO NETO TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 326,630.04
  COELHO NETO TR 230/69 kV COELHO NETO TF2 MA RBF FT TR 230/69 kV COELHO NETO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 362,642.28
  COELHO NETO TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 362,642.28
  COELHO NETO MG 230 kV COELHO NETO MG1 MA RB FT MG 230 kV COELHO NETO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 474,234.68
  COELHO NETO MG 230 kV COELHO NETO MG1 MA RB FT MG 230 kV COELHO NETO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 526,520.89
  COELHO NETO TR 230/69 kV COELHO NETO TF2 MA RBF FT TR 230/69 kV COELHO NETO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 635,850.66
  COELHO NETO TR 230/69 kV COELHO NETO TF1 MA RBF FT TR 230/69 kV COELHO NETO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 635,850.66
  COELHO NETO MG 230 kV COELHO NETO MG1 MA RB FT MG 230 kV COELHO NETO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 923,192.57
  COLETORA PORTO VELHO IB 230 kV MG 500 kV COLETORA PORTO VELHO MG1 RO IB1 RB FT MG 500 kV COLETORA PORTO VELHO MG1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 178,266.44
  COLETORA PORTO VELHO IB 500 kV MG 500 kV COLETORA PORTO VELHO MG2 RO IB3 RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 255,583.00
  COLETORA PORTO VELHO IB 500 kV MG 500 kV COLETORA PORTO VELHO MG2 RO IB2 RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 255,583.00
  COLETORA PORTO VELHO MC 230 kV BF 230 kV 0 Mvar COLETORA PORTO VELHO FH74 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 280,820.91
  COLETORA PORTO VELHO MC 230 kV BF 230 kV 0 Mvar COLETORA PORTO VELHO FH73 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 280,820.91
  COLETORA PORTO VELHO MC 230 kV BF 230 kV 0 Mvar COLETORA PORTO VELHO FH72 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 280,820.91
  COLETORA PORTO VELHO MC 230 kV BF 230 kV 0 Mvar COLETORA PORTO VELHO FH71 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 280,820.91
  COLETORA PORTO VELHO IB 500 kV MG 500 kV COLETORA PORTO VELHO MG1 RO IB1 RB FT MG 500 kV COLETORA PORTO VELHO MG1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 296,419.28
  COLETORA PORTO VELHO MC 230 kV CV 500/230 kV COLETORA PORTO VELHO BTB2 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 322,394.26
  COLETORA PORTO VELHO MC 230 kV CV 500/230 kV COLETORA PORTO VELHO BTB1 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 322,394.26
  COLETORA PORTO VELHO EL 230 kV COLETORA PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 371,509.90
  COLETORA PORTO VELHO EL 230 kV COLETORA PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 371,509.90
  COLETORA PORTO VELHO MC 500 kV BF 500 kV 0 Mvar COLETORA PORTO VELHO FH51 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 589,019.14
  COLETORA PORTO VELHO MC 500 kV BF 500 kV 0 Mvar COLETORA PORTO VELHO FH41 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 589,019.14
  COLETORA PORTO VELHO MC 500 kV CV 600/600 kV COLETORA PORTO VELHO CC2 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 663,332.20
  COLETORA PORTO VELHO MC 500 kV CV 600/600 kV COLETORA PORTO VELHO CC1 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 663,332.20
  COLETORA PORTO VELHO MC 500 kV CV 500/230 kV COLETORA PORTO VELHO BTB2 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 769,317.41
  COLETORA PORTO VELHO MC 500 kV CV 500/230 kV COLETORA PORTO VELHO BTB1 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 769,317.41
  COLETORA PORTO VELHO BF 230 kV 0 Mvar COLETORA PORTO VELHO FH74 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 2,094,309.25
  COLETORA PORTO VELHO BF 230 kV 0 Mvar COLETORA PORTO VELHO FH73 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 2,094,309.25
  COLETORA PORTO VELHO BF 230 kV 0 Mvar COLETORA PORTO VELHO FH72 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 2,094,309.25
  COLETORA PORTO VELHO BF 230 kV 0 Mvar COLETORA PORTO VELHO FH71 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 2,094,309.25
  COLETORA PORTO VELHO BF 500 kV 0 Mvar COLETORA PORTO VELHO FH54 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 2,792,410.74
  COLETORA PORTO VELHO MG 500 kV COLETORA PORTO VELHO MG1 RO RB FT MG 500 kV COLETORA PORTO VELHO MG1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 4,807,527.63
  COLETORA PORTO VELHO BF 500 kV 0 Mvar COLETORA PORTO VELHO FH44 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 5,584,821.48

 

138 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  COLETORA PORTO VELHO BF 500 kV 0 Mvar COLETORA PORTO VELHO FH51 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 17,808,798.57
  COLETORA PORTO VELHO BF 500 kV 0 Mvar COLETORA PORTO VELHO FH41 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 17,808,798.57
  COLETORA PORTO VELHO CV 500/230 kV COLETORA PORTO VELHO BTB2 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 31,502,806.45
  COLETORA PORTO VELHO CV 500/230 kV COLETORA PORTO VELHO BTB1 RO RB FT CV 500/230 kV COLETORA PORTO VELHO BTB1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 31,502,806.45
  COLETORA PORTO VELHO CV 600/600 kV COLETORA PORTO VELHO CC2 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 56,226,957.65
  COLETORA PORTO VELHO CV 600/600 kV COLETORA PORTO VELHO CC1 RO RB FT CV 600/600 kV ARARAQUARA 2 CC1 SP 012/2009 IPCA RBL CC 012/2009 1/4/2013 26/02/2039 56,226,957.65
  COLINAS EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBNI REA 5861/2016 5/6/2019 4/6/2034 13,910.49
  COLINAS EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBNI REA 5861/2016 3/6/2019 2/6/2034 13,910.49
  COLINAS RTL 500 kV 45,45 MVAr COLINAS RTR1 TO RB FT RTL 500 kV 45,45 MVAr COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,346.74
  COLINAS RTB 500 kV 45,45 Mvar COLINAS RTR1 TO RB FT RTB 500 kV 45,45 Mvar COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,346.74
  COLINAS MC 500 kV RTL 500 kV 136 MVAr COLINAS RT2 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  COLINAS MC 500 kV RTL 500 kV 136 MVAr COLINAS RT1 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  COLINAS RTL 500 kV 45,45 MVAr COLINAS RTR1 TO RB FT RTL 500 kV 45,45 MVAr COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 315,697.08
  COLINAS RTB 500 kV 45,45 Mvar COLINAS RTR1 TO RB FT RTB 500 kV 45,45 Mvar COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 315,697.08
  COLINAS MC 500 kV RTB 500 kV 165 Mvar COLINAS RT4 TO RB FT RTB 500 kV 165 Mvar COLINAS RT4 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,570.80
  COLINAS IB 500 kV MG 500 kV COLINAS MG2 TO IB1 RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  COLINAS EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  COLINAS EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  COLINAS RTL 500 kV 45,45 MVAr COLINAS RTR1 TO RB FT RTL 500 kV 45,45 MVAr COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 553,537.76
  COLINAS RTB 500 kV 45,45 Mvar COLINAS RTR1 TO RB FT RTB 500 kV 45,45 Mvar COLINAS RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 553,537.76
  COLINAS IB 500 kV MG 500 kV COLINAS MG2 TO IB1 RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  COLINAS EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  COLINAS EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  COLINAS CR 500 kV 161 MVAr COLINAS BC2 TO RB FT CR 500 kV 161 MVAr COLINAS BC2 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 623,442.35
  COLINAS CR 500 kV 161 MVAr COLINAS BC1 TO RB FT CR 500 kV 161 MVAr COLINAS BC1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 623,442.35
  COLINAS CR 500 kV 161 MVAr COLINAS BC2 TO RB FT CR 500 kV 161 MVAr COLINAS BC2 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 692,179.29
  COLINAS CR 500 kV 161 MVAr COLINAS BC1 TO RB FT CR 500 kV 161 MVAr COLINAS BC1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 692,179.29
  COLINAS RTL 500 kV 136 MVAr COLINAS RT2 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 852,322.87
  COLINAS RTL 500 kV 136 MVAr COLINAS RT1 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 852,322.87
  COLINAS RTB 500 kV 165 Mvar COLINAS RT4 TO RB FT RTB 500 kV 165 Mvar COLINAS RT4 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 906,271.12
  COLINAS RTL 500 kV 136 MVAr COLINAS RT2 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 946,294.78
  COLINAS RTL 500 kV 136 MVAr COLINAS RT1 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 946,294.78
  COLINAS IB 500 kV MG 500 kV COLINAS MG2 TO IB1 RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 973,306.35
  COLINAS RTB 500 kV 165 Mvar COLINAS RT4 TO RB FT RTB 500 kV 165 Mvar COLINAS RT4 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,006,191.03
  COLINAS MG 500 kV COLINAS MG2 TO RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,027,949.80
  COLINAS EL 500 kV COLINAS LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,039,169.68
  COLINAS EL 500 kV COLINAS LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,039,169.68
  COLINAS MG 500 kV COLINAS MG2 TO RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,141,285.26
  COLINAS CR 500 kV 161 MVAr COLINAS BC2 TO RB FT CR 500 kV 161 MVAr COLINAS BC2 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,213,655.13
  COLINAS CR 500 kV 161 MVAr COLINAS BC1 TO RB FT CR 500 kV 161 MVAr COLINAS BC1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,213,655.13
  COLINAS RTL 500 kV 136 MVAr COLINAS RT2 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,659,216.79
  COLINAS RTL 500 kV 136 MVAr COLINAS RT1 TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,659,216.79
  COLINAS RTB 500 kV 165 Mvar COLINAS RT4 TO RB FT RTB 500 kV 165 Mvar COLINAS RT4 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,764,237.84
  COLINAS MG 500 kV COLINAS MG2 TO RB FT MG 500 kV COLINAS MG2 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,001,109.72
  COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI DSP 1422/2021 25/01/2022 24/01/2052 10,798.77
  COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI DSP 1422/2021 26/01/2022 25/01/2052 10,799.13
  COXIPO EL 138 kV COXIPO  DIST4 DIT   058/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2047 11,199.27
  COXIPO EL 138 kV COXIPO  DIST4 DIT   058/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2047 11,199.27
  COXIPO EL 138 kV COXIPO  DIST4 DIT   058/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2047 11,199.27
  COXIPO TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 1/10/2018 1/10/2052 27,673.21
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 1/10/2018 1/10/2040 28,233.15
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 1/3/2019 1/3/2041 28,400.44
  COXIPO TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 1/3/2019 1/3/2053 29,761.44
  COXIPO MC 230 kV TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 1/10/2018 1/10/2042 29,984.11
  COXIPO MC 230 kV TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 1/3/2019 1/3/2042 30,095.71
  COXIPO EL 138 kV COXIPO  DIST5 DIT   058/2001 IPCA RCDM REA 8161/2019 13/09/2019 13/09/2034 40,291.84
  COXIPO EL 138 kV COXIPO  DIST4 DIT   058/2001 IPCA RCDM REA 8161/2019 13/09/2019 13/09/2034 40,291.84
  COXIPO EL 138 kV COXIPO  DIST3 DIT   058/2001 IPCA RCDM REA 8161/2019 13/09/2019 13/09/2034 40,291.84
  COXIPO EL 138 kV COXIPO  DIST2 DIT   058/2001 IPCA RCDM REA 8161/2019 13/09/2019 13/09/2034 40,291.84
  COXIPO EL 138 kV COXIPO  DIST1 DIT   058/2001 IPCA RCDM REA 8161/2019 13/09/2019 13/09/2034 40,291.84
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR4 MT RBF FT TR 230/138 kV COXIPO TR4 MT 058/2001 IPCA RBNI REA 5569/2015 9/4/2018 9/4/2051 41,340.62
  COXIPO EL 138 kV COXIPO  DIST5 DIT   058/2001 IPCA RCDM REA 5569/2015 6/2/2018 6/2/2048 41,436.78
  COXIPO EL 138 kV COXIPO  DIST4 DIT   058/2001 IPCA RCDM REA 5569/2015 6/2/2018 6/2/2048 41,436.78
  COXIPO EL 138 kV COXIPO  DIST3 DIT   058/2001 IPCA RCDM REA 5569/2015 6/2/2018 6/2/2048 41,436.78
  COXIPO EL 138 kV COXIPO  DIST2 DIT   058/2001 IPCA RCDM REA 5569/2015 6/2/2018 6/2/2048 41,436.78
  COXIPO EL 13,8 kV COXIPO  DIST8 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  COXIPO EL 13,8 kV COXIPO  DIST7 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  COXIPO IB 138 kV MG 230 kV COXIPO MG1 MT IB1 DIT   058/2001 IPCA RCDM REA 5569/2015 7/2/2018 7/2/2058 59,224.28
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC9 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,172.99
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC8 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,172.99
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC7 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,172.99
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC6 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,172.99
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC5 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,172.99
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC4 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,172.99
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC3 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,172.99
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC2 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,172.99
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC1 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,172.99
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC9 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 66,807.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC8 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 66,807.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC7 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 66,807.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC6 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 66,807.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC5 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 66,807.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC4 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 66,807.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC3 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC3 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 66,807.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC2 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 66,807.29
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC1 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 66,807.29

 

139 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  COXIPO EL 138 kV COXIPO  DIST4 DIT   058/2001 IPCA RCDM REA 5569/2015 6/2/2018 6/2/2049 78,237.74
  COXIPO EL 138 kV COXIPO  DIST3 DIT   058/2001 IPCA RCDM REA 5569/2015 6/2/2018 6/2/2049 78,237.74
  COXIPO EL 138 kV COXIPO  DIST2 DIT   058/2001 IPCA RCDM REA 5569/2015 6/2/2018 6/2/2049 78,237.74
  COXIPO EL 138 kV COXIPO  DIST1 DIT   058/2001 IPCA RCDM REA 5569/2015 6/2/2018 6/2/2049 78,237.74
  COXIPO MC 138 kV RTL 138 kV 5 Mvar COXIPO RT2 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,489.07
  COXIPO MC 138 kV RTL 138 kV 5 Mvar COXIPO RT1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,489.07
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC9 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC8 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC7 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC6 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC5 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC4 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC3 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC2 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC1 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  COXIPO EL 230 kV COXIPO LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBNI REA 2384/2010 20/12/2012 19/12/2037 88,193.57
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC9 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 91,159.85
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC8 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 91,159.85
  COXIPO MC 13,8 kV BC 13,8 kV 9,6 MVAr COXIPO BC7 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 91,159.85
  COXIPO TR 230/138 kV COXIPO TRR2 MT RBF FT TR 230/138 kV COXIPO TRR2 MT 058/2001 IPCA RBNI REA 8161/2019 13/09/2019 13/09/2044 101,545.51
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC9 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC9 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 117,138.74
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC8 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC8 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 117,138.74
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC7 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC7 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 117,138.74
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC6 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC6 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 117,138.74
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC5 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC5 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 117,138.74
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC4 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC4 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 117,138.74
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC3 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC3 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 117,138.74
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC2 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 117,138.74
  COXIPO BC 13,8 kV 9,6 MVAr COXIPO BC1 MT RBF FT BC 13,8 kV 9,6 MVAr COXIPO BC1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 117,138.74
  COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI DSP 1422/2021 27/01/2022 26/01/2050 121,884.89
  COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI REA 5569/2015 11/12/2017 10/12/2045 128,109.42
  COXIPO EL 230 kV COXIPO LT 230 kV VARZEA GRANDE /COXIPO C-2 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT 058/2001 IPCA RBNI REA 4967/2014 21/06/2016 20/06/2044 135,755.78
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR5 MT RBF FT TR 230/138 kV COXIPO TR5 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 137,683.86
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR4 MT RBF FT TR 230/138 kV COXIPO TR4 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 137,683.86
  COXIPO RTL 138 kV 5 Mvar COXIPO RT2 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 142,512.93
  COXIPO RTL 138 kV 5 Mvar COXIPO RT1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 142,512.93
  COXIPO RTL 138 kV 5 Mvar COXIPO RT2 MT DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 158,225.53
  COXIPO RTL 138 kV 5 Mvar COXIPO RT1 MT DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 158,225.53
  COXIPO MC 230 kV TR 230/138 kV COXIPO TR5 MT RBF FT TR 230/138 kV COXIPO TR5 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  COXIPO MC 230 kV TR 230/138 kV COXIPO TR4 MT RBF FT TR 230/138 kV COXIPO TR4 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  COXIPO MC 230 kV TR 230/12,3 kV COXIPO TF1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  COXIPO MC 230 kV TR 230/12,3 kV COXIPO TF1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 193,954.55
  COXIPO EL 138 kV COXIPO  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 201,085.13
  COXIPO EL 138 kV COXIPO  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 201,085.13
  COXIPO EL 138 kV COXIPO  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 201,085.13
  COXIPO EL 138 kV COXIPO  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 201,085.13
  COXIPO EL 138 kV COXIPO  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 201,085.13
  COXIPO EL 138 kV COXIPO  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 201,085.13
  COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI REA 5569/2015 11/12/2017 10/12/2045 203,434.28
  COXIPO TR 230/138 kV COXIPO TRR2 MT RBF FT TR 230/138 kV COXIPO TRR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 206,570.48
  COXIPO EL 138 kV COXIPO  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 223,255.54
  COXIPO EL 230 kV COXIPO LT 230 kV VARZEA GRANDE /COXIPO C-2 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  COXIPO EL 230 kV COXIPO LT 230 kV VARZEA GRANDE /COXIPO C-1 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  COXIPO EL 230 kV COXIPO LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  COXIPO EL 230 kV COXIPO LT 230 kV RONDONOPOLIS /COXIPO C-1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  COXIPO EL 230 kV COXIPO LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  COXIPO EL 230 kV COXIPO LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,563.91
  COXIPO EL 230 kV COXIPO LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,563.91
  COXIPO RTL 138 kV 5 Mvar COXIPO RT2 MT DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 277,429.89
  COXIPO RTL 138 kV 5 Mvar COXIPO RT1 MT DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 277,429.89
  COXIPO BC 138 kV 35,00 Mvar COXIPO BCD3 MT DIT   058/2001 IPCA RCDM REA 8348/2019 15/02/2022 15/02/2044 298,825.23
  COXIPO BC 138 kV 35,00 Mvar COXIPO BCD2 MT DIT   058/2001 IPCA RCDM REA 8348/2019 15/02/2022 15/02/2044 298,825.23
  COXIPO BC 138 kV 35,00 Mvar COXIPO BCD1 MT DIT   058/2001 IPCA RCDM REA 8348/2019 15/02/2022 15/02/2044 298,825.23
  COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI REA 8348/2019 15/02/2022 15/02/2053 311,066.90
  COXIPO IB 138 kV MG 230 kV COXIPO MG1 MT IB1 DIT   058/2001 IPCA RCDM REA 5569/2015 7/2/2018 7/2/2039 327,026.00
  COXIPO RTL 230 kV 30 Mvar COXIPO RT2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 328,076.01
  COXIPO TR 230/12,3 kV COXIPO TF1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 339,524.81
  COXIPO TR 230/12,3 kV COXIPO TF1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 376,958.74
  COXIPO EL 138 kV COXIPO  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 391,452.39
  COXIPO IB 230 kV MG 230 kV COXIPO MG1 MT IB1 RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBNI REA 5569/2015 22/11/2017 21/11/2048 405,382.34
  COXIPO RTL 230 kV 30 MVAr COXIPO RT1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 411,079.54
  COXIPO RTL 230 kV 30 MVAr COXIPO RT1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 456,402.66
  COXIPO EL 230 kV COXIPO LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 483,168.97
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR2 MT RBF FT TR 230/138 kV COXIPO TR2 MT 058/2001 IPCA RBNI REA 5569/2015 28/05/2018 28/05/2040 551,367.08
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 1/10/2018 1/10/2040 594,789.64
  COXIPO TR 230/138 kV COXIPO TR5 MT RBF FT TR 230/138 kV COXIPO TR5 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 619,735.70
  COXIPO TR 230/138 kV COXIPO TR4 MT RBF FT TR 230/138 kV COXIPO TR4 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 619,735.70
  COXIPO TR 230/12,3 kV COXIPO TF1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 660,952.90
  COXIPO MC 230 kV TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 1/10/2018 1/10/2042 712,336.50
  COXIPO MC 230 kV TR 230/138 kV COXIPO TR2 MT RBF FT TR 230/138 kV COXIPO TR2 MT 058/2001 IPCA RBNI REA 5569/2015 28/05/2018 28/05/2041 741,068.15
  COXIPO MC 138 kV BC 138 kV 35,00 Mvar COXIPO BCD3 MT DIT   058/2001 IPCA RCDM REA 8348/2019 15/02/2022 15/02/2050 759,048.92
  COXIPO MC 138 kV BC 138 kV 35,00 Mvar COXIPO BCD2 MT DIT   058/2001 IPCA RCDM REA 8348/2019 15/02/2022 15/02/2050 759,048.92
  COXIPO MC 138 kV BC 138 kV 35,00 Mvar COXIPO BCD1 MT DIT   058/2001 IPCA RCDM REA 8348/2019 15/02/2022 15/02/2050 759,048.92
  COXIPO RTL 230 kV 30 MVAr COXIPO RT1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 800,248.48
  COXIPO MC 138 kV TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 11/12/2017 10/12/2047 883,865.05
  COXIPO MG 230 kV COXIPO MG1 MT RB FT MG 230 kV COXIPO MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 920,388.86

 

140 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  COXIPO MC 230 kV TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 11/12/2017 10/12/2047 1,104,220.08
  COXIPO TR 230/138 kV COXIPO TR3 MT RBF FT TR 230/138 kV COXIPO TR3 MT 058/2001 IPCA RBNI REA 5569/2015 1/10/2018 1/10/2052 1,696,354.50
  COXIPO TR 230/138 kV COXIPO TR2 MT RBF FT TR 230/138 kV COXIPO TR2 MT 058/2001 IPCA RBNI REA 5569/2015 28/05/2018 28/05/2052 1,723,964.34
  COXIPO TR 230/138 kV COXIPO TR1 MT RBF FT TR 230/138 kV COXIPO TR1 MT 058/2001 IPCA RBNI REA 5569/2015 11/12/2017 10/12/2050 1,726,803.13
  COXIPO TR 230/138 kV COXIPO TRR1 MT RBF FT TR 230/138 kV COXIPO TRR1 MT 058/2001 IPCA RBNI REA 5569/2015 22/07/2019 22/07/2053 1,732,260.94
  COXIPO CE 70/-50 MvAr COXIPO CE1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,077,402.08
  COXIPO CE 70/-50 MvAr COXIPO CE1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,306,443.73
  COXIPO CE 70/-50 MvAr COXIPO CE1 MT RB FT CE 70/-50 MvAr COXIPO CE1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,044,078.30
  CVRD EL 230 kV CVRD LT 230 kV CVRD /SAO LUIS II C-1 PA/MA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 241,776.23
  CVRD EL 230 kV CVRD LT 230 kV CVRD /SAO LUIS II C-1 PA/MA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 268,433.00
  CVRD EL 230 kV CVRD LT 230 kV CVRD /SAO LUIS II C-1 PA/MA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 470,665.75
  GUAMA MG 230 kV GUAMA MG1 PA RB FT MG 230 kV GUAMA MG1 PA 058/2001 IPCA RMEL REN 643/2014 31/10/2014 30/10/2044 15,718.10
  GUAMA MG 230 kV GUAMA MG1 PA RB FT MG 230 kV GUAMA MG1 PA 058/2001 IPCA RMEL REN 643/2014 18/12/2014 17/12/2044 15,778.57
  GUAMA TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RMEL REA 2837/2011 3/3/2013 2/3/2048 42,911.24
  GUAMA EL 230 kV GUAMA LT 230 kV VILA DO CONDE /GUAMA C-1 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA 058/2001 IPCA RMEL REN 643/2014 27/07/2014 26/07/2044 46,791.51
  GUAMA EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-1 PA RB FT LT 230 kV GUAMA /MARITUBA C-1 PA 058/2001 IPCA RMEL REN 643/2014 14/09/2014 13/09/2044 46,976.68
  GUAMA EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-2 PA RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RMEL REN 643/2014 14/10/2015 13/10/2045 48,469.44
  GUAMA TR 230/69 kV GUAMA TR1 PA RBF FT TR 230/69 kV GUAMA TR1 PA 058/2001 IPCA RMEL REA 2837/2011 3/3/2013 2/3/2047 53,904.58
  GUAMA MC 69 kV TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  GUAMA MC 69 kV TR 230/69 kV GUAMA TR1 PA RBF FT TR 230/69 kV GUAMA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  GUAMA TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RMEL REN 443/2011 13/11/2016 12/11/2030 67,142.60
  GUAMA MC 69 kV TR 230/69 kV GUAMA TR3 PA RBF FT TR 230/69 kV GUAMA TR3 PA 058/2001 IPCA RBNI REA 539/2006 3/2/2014 2/2/2043 76,675.32
  GUAMA IB 230 kV MG 230 kV GUAMA MG1 PA IB1 RB FT MG 230 kV GUAMA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  GUAMA MC 230 kV TR 230/69 kV GUAMA TR3 PA RBF FT TR 230/69 kV GUAMA TR3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  GUAMA MC 230 kV TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  GUAMA MC 230 kV TR 230/69 kV GUAMA TR1 PA RBF FT TR 230/69 kV GUAMA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  GUAMA MC 230 kV BC 230 kV 55 Mvar GUAMA BC2 PA RB FT BC 230 kV 55 Mvar GUAMA BC2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 205,385.16
  GUAMA MC 230 kV BC 230 kV 55 Mvar GUAMA BC1 PA RB FT BC 230 kV 55 Mvar GUAMA BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 205,385.16
  GUAMA BC 230 kV 55 Mvar GUAMA BC2 PA RB FT BC 230 kV 55 Mvar GUAMA BC2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 225,709.52
  GUAMA BC 230 kV 55 Mvar GUAMA BC1 PA RB FT BC 230 kV 55 Mvar GUAMA BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 225,709.52
  GUAMA TR 230/69 kV GUAMA TRR1 PA RBF FT TR 230/69 kV GUAMA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 229,209.95
  GUAMA TR 230/69 kV GUAMA TRR1 PA RBF FT TR 230/69 kV GUAMA TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 254,481.24
  GUAMA EL 230 kV GUAMA LT 230 kV VILA DO CONDE /GUAMA C-2 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  GUAMA EL 230 kV GUAMA LT 230 kV VILA DO CONDE /GUAMA C-1 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  GUAMA EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-2 PA RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  GUAMA EL 230 kV GUAMA LT 230 kV GUAMA /MARITUBA C-1 PA RB FT LT 230 kV GUAMA /MARITUBA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  GUAMA MG 230 kV GUAMA MG1 PA RB FT MG 230 kV GUAMA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 627,121.01
  GUAMA TR 230/69 kV GUAMA TR3 PA RBF FT TR 230/69 kV GUAMA TR3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 687,629.85
  GUAMA TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 687,629.85
  GUAMA TR 230/69 kV GUAMA TR1 PA RBF FT TR 230/69 kV GUAMA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 687,629.85
  GUAMA TR 230/69 kV GUAMA TR2 PA RBF FT TR 230/69 kV GUAMA TR2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 763,443.72
  GUAMA TR 230/69 kV GUAMA TR1 PA RBF FT TR 230/69 kV GUAMA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 763,443.72
  IMPERATRIZ MC 69 kV RTN 69 kV 0 Mvar IMPERATRIZ RN4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,653.70
  IMPERATRIZ MC 69 kV RTN 69 kV 0 Mvar IMPERATRIZ RN2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,653.70
  IMPERATRIZ MC 69 kV RTN 69 kV 0 Mvar IMPERATRIZ RN12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,653.70
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 13,333.52
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 13,349.73
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 13,352.97
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 13,352.97
  IMPERATRIZ RTN 69 kV 0 Mvar IMPERATRIZ RN4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  IMPERATRIZ RTN 69 kV 0 Mvar IMPERATRIZ RN2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  IMPERATRIZ RTN 69 kV 0 Mvar IMPERATRIZ RN12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2031 16,194.61
  IMPERATRIZ RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2031 16,194.61
  IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RMEL REN 443/2011 4/6/2017 3/6/2031 16,350.89
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RMEL REN 443/2011 2/9/2017 1/9/2031 16,443.71
  IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RMEL REN 443/2011 19/01/2017 18/01/2031 19,399.28
  IMPERATRIZ TR 500/230 kV IMPERATRIZ TR2 MA RB FT TR 500/230 kV IMPERATRIZ TR2 MA 058/2001 IPCA RMEL REN 443/2011 18/02/2017 17/02/2031 24,713.03
  IMPERATRIZ TR 500/230 kV IMPERATRIZ TR1 MA RB FT TR 500/230 kV IMPERATRIZ TR1 MA 058/2001 IPCA RMEL REN 443/2011 4/5/2017 3/5/2031 24,781.84
  IMPERATRIZ IB 69 kV MG 500 kV IMPERATRIZ MG2 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,894.81
  IMPERATRIZ MG 500 kV IMPERATRIZ MG2 MA RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBNI REA 2040/2009 29/06/2017 28/06/2045 53,799.46
  IMPERATRIZ MG 500 kV IMPERATRIZ MG2 MA RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBNI REN 443/2011 27/10/2017 26/10/2045 54,245.84
  IMPERATRIZ EL 13,8 kV IMPERATRIZ  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  IMPERATRIZ MC 13,8 kV CS 100/-70 Mvar IMPERATRIZ CS3 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,646.29
  IMPERATRIZ MC 13,8 kV CS 100/-70 Mvar IMPERATRIZ CS2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,646.29
  IMPERATRIZ MC 13,8 kV CS 100/-70 Mvar IMPERATRIZ CS1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,646.29
  IMPERATRIZ MC 69 kV TR 230/69 kV IMPERATRIZ TF5 MA RBF FT TR 230/69 kV IMPERATRIZ TF5 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  IMPERATRIZ MC 69 kV TR 230/69 kV IMPERATRIZ TF4 MA RBF FT TR 230/69 kV IMPERATRIZ TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  IMPERATRIZ MC 69 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBNI REA 8314/2019 24/08/2021 23/08/2036 73,661.71
  IMPERATRIZ MC 69 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 79,116.64
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST4 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,493.13
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,493.13
  IMPERATRIZ MC 69 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 138,721.74
  IMPERATRIZ IB 230 kV MG 500 kV IMPERATRIZ MG2 MA IB1 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST4 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 162,175.84
  IMPERATRIZ EL 69 kV IMPERATRIZ  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 162,175.84
  IMPERATRIZ MC 230 kV TR 500/230 kV IMPERATRIZ TR2 MA RB FT TR 500/230 kV IMPERATRIZ TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  IMPERATRIZ MC 230 kV TR 500/230 kV IMPERATRIZ TR1 MA RB FT TR 500/230 kV IMPERATRIZ TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  IMPERATRIZ MC 230 kV TR 230/69 kV IMPERATRIZ TF5 MA RBF FT TR 230/69 kV IMPERATRIZ TF5 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08

 

141 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  IMPERATRIZ MC 230 kV TR 230/69 kV IMPERATRIZ TF4 MA RBF FT TR 230/69 kV IMPERATRIZ TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  IMPERATRIZ MC 230 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  IMPERATRIZ MC 230 kV TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  IMPERATRIZ MC 230 kV TR 230/13,8 kV IMPERATRIZ TF1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  IMPERATRIZ MC 230 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 204,396.72
  IMPERATRIZ MC 230 kV TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 204,396.72
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RMEL REA 5229/2015 9/1/2018 8/1/2048 249,063.35
  IMPERATRIZ RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA RB FT RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 255,407.76
  IMPERATRIZ EL 230 kV IMPERATRIZ LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  IMPERATRIZ TT 69/0 kV IMPERATRIZ TT1 MA DIT   058/2001 IPCA RCDM REN 443/2011 28/11/2019 27/11/2049 271,997.18
  IMPERATRIZ RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA RB FT RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 283,567.46
  IMPERATRIZ RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA RB FT RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,039.19
  IMPERATRIZ RTB 500 kV 45,3 Mvar IMPERATRIZ RTR6 MA RB FT RTB 500 kV 45,3 Mvar IMPERATRIZ RTR6 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,039.19
  IMPERATRIZ RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA RB FT RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,346.74
  IMPERATRIZ EL 230 kV IMPERATRIZ LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 285,067.43
  IMPERATRIZ MC 500 kV RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  IMPERATRIZ MC 500 kV RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  IMPERATRIZ MC 500 kV RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  IMPERATRIZ MC 500 kV RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  IMPERATRIZ MC 500 kV RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  IMPERATRIZ MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  IMPERATRIZ RTB 500 kV 54,4 Mvar IMPERATRIZ RTR14 MA RB FT RTB 500 kV 54,4 Mvar IMPERATRIZ RTR14 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 301,069.87
  IMPERATRIZ RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA RB FT RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 315,355.61
  IMPERATRIZ RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA RB FT RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 315,697.08
  IMPERATRIZ MC 230 kV TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 358,385.66
  IMPERATRIZ EL 69 kV IMPERATRIZ  SANTA RITA DIT   058/2001 IPCA RCDM REA 2040/2009 29/06/2017 28/06/2047 396,350.59
  IMPERATRIZ EL 69 kV IMPERATRIZ  IMPERATRIZ DIT   058/2001 IPCA RCDM REN 443/2011 27/10/2017 26/10/2048 396,620.23
  IMPERATRIZ TR 230/69 kV IMPERATRIZ TF5 MA RBF FT TR 230/69 kV IMPERATRIZ TF5 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  IMPERATRIZ TR 230/69 kV IMPERATRIZ TF4 MA RBF FT TR 230/69 kV IMPERATRIZ TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  IMPERATRIZ TR 230/69 kV IMPERATRIZ TF3 MA RBF FT TR 230/69 kV IMPERATRIZ TF3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  IMPERATRIZ CR 500 kV 107 Mvar IMPERATRIZ BC3 MA RB FT CR 500 kV 107 Mvar IMPERATRIZ BC3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 424,118.15
  IMPERATRIZ MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 441,123.86
  IMPERATRIZ MC 500 kV RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA RB FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 441,123.86
  IMPERATRIZ TR 230/69 kV IMPERATRIZ TF4 MA RBF FT TR 230/69 kV IMPERATRIZ TF4 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 445,862.60
  IMPERATRIZ CR 500 kV 107 Mvar IMPERATRIZ BC3 MA RB FT CR 500 kV 107 Mvar IMPERATRIZ BC3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 470,878.83
  IMPERATRIZ MC 500 kV TR 500/230 kV IMPERATRIZ TR2 MA RB FT TR 500/230 kV IMPERATRIZ TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 471,137.52
  IMPERATRIZ MC 500 kV TR 500/230 kV IMPERATRIZ TR1 MA RB FT TR 500/230 kV IMPERATRIZ TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 471,137.52
  IMPERATRIZ MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 489,759.48
  IMPERATRIZ MC 500 kV RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA RB FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 489,759.48
  IMPERATRIZ RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA RB FT RTL 500 kV 33,3 Mvar IMPERATRIZ RTR4 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 497,202.26
  IMPERATRIZ EL 230 kV IMPERATRIZ LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 499,832.27
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB5 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB4 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB3 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB2 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG1 MA IB1 RB FT MG 500 kV IMPERATRIZ MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  IMPERATRIZ RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA RB FT RTL 500 kV 45,3 Mvar IMPERATRIZ RTR5 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 552,939.04
  IMPERATRIZ RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA RB FT RTL 500 kV 45,45 Mvar IMPERATRIZ RTR6 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 553,537.76
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB5 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB4 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  IMPERATRIZ CR 500 kV 161 Mvar IMPERATRIZ BC4 MA RB FT CR 500 kV 161 Mvar IMPERATRIZ BC4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 623,442.35
  IMPERATRIZ CR 500 kV 161 Mvar IMPERATRIZ BC4 MA RB FT CR 500 kV 161 Mvar IMPERATRIZ BC4 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 692,179.29
  IMPERATRIZ TR 500/230 kV IMPERATRIZ TRR1 MA RB FT TR 500/230 kV IMPERATRIZ TRR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 707,515.01
  IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 719,987.29
  IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 719,987.29
  IMPERATRIZ RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 766,502.54
  IMPERATRIZ TR 230/69 kV IMPERATRIZ TF4 MA RBF FT TR 230/69 kV IMPERATRIZ TF4 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 781,767.73
  IMPERATRIZ TR 500/230 kV IMPERATRIZ TRR1 MA RB FT TR 500/230 kV IMPERATRIZ TRR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 785,521.29
  IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 799,368.68
  IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 799,368.68
  IMPERATRIZ CR 500 kV 107 Mvar IMPERATRIZ BC3 MA RB FT CR 500 kV 107 Mvar IMPERATRIZ BC3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 825,630.74
  IMPERATRIZ RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 851,012.42
  IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 852,322.87
  IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 852,322.87
  IMPERATRIZ RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA RB FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 852,322.87
  IMPERATRIZ MC 500 kV RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 858,735.75
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 879,669.63
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 879,669.63
  IMPERATRIZ RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT14 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 906,271.12
  IMPERATRIZ RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 906,271.12
  IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 946,294.78
  IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 946,294.78
  IMPERATRIZ RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA RB FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 946,294.78
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB5 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 973,306.35
  IMPERATRIZ IB 500 kV MG 500 kV IMPERATRIZ MG2 MA IB4 RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 973,306.35
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 976,656.62
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 976,656.62
  IMPERATRIZ RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,006,191.03

 

142 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  IMPERATRIZ EL 500 kV IMPERATRIZ LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,039,169.68
  IMPERATRIZ CR 500 kV 161 Mvar IMPERATRIZ BC4 MA RB FT CR 500 kV 161 Mvar IMPERATRIZ BC4 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,213,655.13
  IMPERATRIZ CR 500 kV 390 Mvar IMPERATRIZ BC1 MA RB FT CR 500 kV 390 Mvar IMPERATRIZ BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,388,385.80
  IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,401,599.14
  IMPERATRIZ TR 230/13,8 kV IMPERATRIZ TF1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,401,599.14
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS3 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,476,161.10
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,476,161.10
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,476,161.10
  IMPERATRIZ RTL 500 kV 100 Mvar IMPERATRIZ RT3 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,492,150.37
  IMPERATRIZ CR 500 kV 390 Mvar IMPERATRIZ BC1 MA RB FT CR 500 kV 390 Mvar IMPERATRIZ BC1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,541,460.73
  IMPERATRIZ CR 500 kV 451 Mvar IMPERATRIZ BC2 MA RB FT CR 500 kV 451 Mvar IMPERATRIZ BC2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,568,019.40
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS3 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,638,913.60
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,638,913.60
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,638,913.60
  IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,659,216.79
  IMPERATRIZ RTL 500 kV 136 Mvar IMPERATRIZ RT12 MA RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,659,216.79
  IMPERATRIZ RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA RB FT RTB 500 kV 136 Mvar IMPERATRIZ RT6 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,659,216.79
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,712,452.73
  IMPERATRIZ RTL 500 kV 150 Mvar IMPERATRIZ RT1 MA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,712,452.73
  IMPERATRIZ CR 500 kV 451 Mvar IMPERATRIZ BC2 MA RB FT CR 500 kV 451 Mvar IMPERATRIZ BC2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,740,899.63
  IMPERATRIZ RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA RB FT RTB 500 kV 165 Mvar IMPERATRIZ RT11 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,764,237.84
  IMPERATRIZ TR 500/230 kV IMPERATRIZ TR2 MA RB FT TR 500/230 kV IMPERATRIZ TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,928,034.12
  IMPERATRIZ TR 500/230 kV IMPERATRIZ TR1 MA RB FT TR 500/230 kV IMPERATRIZ TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,122,545.04
  IMPERATRIZ TR 500/230 kV IMPERATRIZ TR1 MA RB FT TR 500/230 kV IMPERATRIZ TR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,356,563.88
  IMPERATRIZ MG 500 kV IMPERATRIZ MG2 MA RB FT MG 500 kV IMPERATRIZ MG2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,607,655.02
  IMPERATRIZ CR 500 kV 390 Mvar IMPERATRIZ BC1 MA RB FT CR 500 kV 390 Mvar IMPERATRIZ BC1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,702,770.42
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS3 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,873,642.57
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS2 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,873,642.57
  IMPERATRIZ CS 100/-70 Mvar IMPERATRIZ CS1 MA RB FT CS 100/-70 Mvar IMPERATRIZ CS1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,873,642.57
  IMPERATRIZ CR 500 kV 451 Mvar IMPERATRIZ BC2 MA RB FT CR 500 kV 451 Mvar IMPERATRIZ BC2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,052,463.11
  INTEGRADORA IB 230 kV MG 230 kV INTEGRADORA MG1 PA IB1 RB FT MG 230 kV INTEGRADORA MG1 PA 058/2001 IPCA RBNI REA 4658/2014 2/9/2013 31/12/2042 182,210.23
  INTEGRADORA EL 230 kV INTEGRADORA LT 230 kV INTEGRADORA /SERRA DO SOSSEGO C-1 PA DIT   058/2001 IPCA RCDM REA 4658/2014 2/9/2013 31/12/2042 297,383.28
  INTEGRADORA EL 230 kV INTEGRADORA LT 230 kV INTEGRADORA /ONCA PUMA C-2 PA RB FT LT 230 kV INTEGRADORA /ONCA PUMA C-2 PA 058/2001 IPCA RBNI REA 4658/2014 2/9/2013 31/12/2042 297,383.28
  INTEGRADORA EL 230 kV INTEGRADORA LT 230 kV INTEGRADORA /ONCA PUMA C-1 PA RB FT LT 230 kV INTEGRADORA /ONCA PUMA C-1 PA 058/2001 IPCA RBNI REA 4658/2014 2/9/2013 31/12/2042 297,383.28
  INTEGRADORA EL 230 kV INTEGRADORA LT 230 kV CARAJAS /INTEGRADORA C-3 PA RB FT LT 230 kV CARAJAS /INTEGRADORA C-3 PA 058/2001 IPCA RBNI REA 4658/2014 2/9/2013 31/12/2042 297,383.28
  INTEGRADORA EL 230 kV INTEGRADORA LT 230 kV CARAJAS /INTEGRADORA C-2 PA RB FT LT 230 kV CARAJAS /INTEGRADORA C-2 PA 058/2001 IPCA RBNI REA 4658/2014 2/9/2013 31/12/2042 297,383.28
  INTEGRADORA MG 230 kV INTEGRADORA MG1 PA RB FT MG 230 kV INTEGRADORA MG1 PA 058/2001 IPCA RBNI REA 4658/2014 2/9/2013 31/12/2042 638,456.92
  JARU MC 69 kV TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBNI REA 3216/2011 11/6/2018 11/6/2052 39,462.74
  JARU MG 230 kV JARU MG1 RO RB FT MG 230 kV JARU MG1 RO 058/2001 IPCA RBNI REA 4225/2013 1/12/2016 30/11/2045 54,772.22
  JARU MC 69 kV TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  JARU TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBNI REA 3216/2011 11/6/2018 11/6/2058 68,399.08
  JARU MC 230 kV TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBNI REA 3216/2011 11/6/2018 11/6/2052 110,227.69
  JARU TR 230/69 kV JARU TR2 RO RBF FT TR 230/69 kV JARU TR2 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2040 143,204.04
  JARU MC 230 kV TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 156,815.21
  JARU TR 230/69 kV JARU TR3 RO RBF FT TR 230/69 kV JARU TR3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 192,095.19
  JARU TR 230/69 kV JARU TR2 RO RBF FT TR 230/69 kV JARU TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 192,095.19
  JARU TR 230/69 kV JARU TR1 RO RBF FT TR 230/69 kV JARU TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 192,095.19
  JARU MG 230 kV JARU MG1 RO RB FT MG 230 kV JARU MG1 RO 058/2001 IPCA RBNI REA 4225/2013 1/12/2016 30/11/2045 194,606.31
  JARU MC 69 kV TR 230/69 kV JARU TR2 RO RBF FT TR 230/69 kV JARU TR2 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2045 358,444.80
  JARU MC 69 kV TR 230/69 kV JARU TR3 RO RBF FT TR 230/69 kV JARU TR3 RO 058/2001 IPCA RBNI REA 4225/2013 1/12/2016 30/11/2046 368,289.81
  JARU MG 230 kV JARU MG1 RO RB FT MG 230 kV JARU MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 427,989.96
  JARU IB 230 kV MG 230 kV JARU MG1 RO IB1 RB FT MG 230 kV JARU MG1 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2046 742,765.23
  JARU MC 230 kV TR 230/69 kV JARU TR2 RO RBF FT TR 230/69 kV JARU TR2 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2045 928,231.92
  JARU TR 230/69 kV JARU TR3 RO RBF FT TR 230/69 kV JARU TR3 RO 058/2001 IPCA RBNI REA 4225/2013 1/12/2016 30/11/2050 930,131.90
  JARU MC 230 kV TR 230/69 kV JARU TR3 RO RBF FT TR 230/69 kV JARU TR3 RO 058/2001 IPCA RBNI REA 4225/2013 1/12/2016 30/11/2046 956,444.32
  JARU EL 230 kV JARU LT 230 kV JARU /JI-PARANA C-1 RO RB FT LT 230 kV JARU /JI-PARANA C-1 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2045 1,035,199.16
  JARU EL 230 kV JARU LT 230 kV ARIQUEMES /JARU C-1 RO RB FT LT 230 kV ARIQUEMES /JARU C-1 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2044 1,036,318.77
  JARU MG 230 kV JARU MG1 RO RB FT MG 230 kV JARU MG1 RO 058/2001 IPCA RBNI REA 3216/2011 14/09/2015 13/09/2041 2,129,576.31
  JAURU MC 69 kV RTN 69 kV 0 Mvar JAURU RN4 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,653.70
  JAURU MC 69 kV RTN 69 kV 0 Mvar JAURU RN3 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,653.70
  JAURU EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE C-2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 5861/2016 7/6/2019 6/6/2034 14,437.20
  JAURU EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE C-1 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBNI REA 5861/2016 7/6/2019 6/6/2034 14,437.20
  JAURU RTN 69 kV 0 Mvar JAURU RN4 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  JAURU RTN 69 kV 0 Mvar JAURU RN3 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  JAURU MC 230 kV RTL 230 kV 30 Mvar JAURU RT4 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  JAURU MC 230 kV RTL 230 kV 30 Mvar JAURU RT3 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  JAURU MC 138 kV TR 230/138 kV JAURU TR2 MT RBF FT TR 230/138 kV JAURU TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,982.73
  JAURU MC 138 kV TR 230/138 kV JAURU TR1 MT RBF FT TR 230/138 kV JAURU TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,982.73
  JAURU IB 230 kV MG 230 kV JAURU MG1 MT IB1 RB FT MG 230 kV JAURU MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  JAURU MG 230 kV JAURU MG1 MT RB FT MG 230 kV JAURU MG1 MT 058/2001 IPCA RBNI REA 8348/2019 30/12/2021 30/12/2052 165,983.04
  JAURU MC 230 kV TR 230/138 kV JAURU TRR1 MT RBF FT TR 230/138 kV JAURU TRR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  JAURU MC 230 kV TR 230/138 kV JAURU TR2 MT RBF FT TR 230/138 kV JAURU TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  JAURU MC 230 kV TR 230/138 kV JAURU TR1 MT RBF FT TR 230/138 kV JAURU TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  JAURU MC 230 kV RTL 230 kV 0 Mvar JAURU RT7 MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 222,354.77
  JAURU EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE C-2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  JAURU EL 230 kV JAURU LT 230 kV JAURU /VARZEA GRANDE C-1 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  JAURU RTL 230 kV 30 Mvar JAURU RT4 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 262,121.78
  JAURU RTL 230 kV 30 Mvar JAURU RT3 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 262,121.78
  JAURU RTB 230 kV 33,30 Mvar JAURU RTR MT RB FT RTB 230 kV 33,3 Mvar JAURU RTR MT 058/2001 IPCA RBNI REA 8348/2019 30/12/2021 30/12/2057 276,784.91
  JAURU TR 230/138 kV JAURU TRR1 MT RBF FT TR 230/138 kV JAURU TRR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 295,378.18
  JAURU MG 230 kV JAURU MG1 MT RB FT MG 230 kV JAURU MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 565,763.75
  JAURU EL 230 kV JAURU LT 230 kV VILHENA /JAURU C-3 RO/MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 678,164.54
  JAURU RTL 230 kV 0 Mvar JAURU RT7 MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 729,298.90
  JAURU RTB 230 kV 100,00 Mvar JAURU RT1 MT RB FT RTB 230 kV 100 Mvar JAURU RT1 MT 058/2001 IPCA RBNI REA 8348/2019 14/01/2022 14/01/2058 830,354.72
  JAURU TR 230/138 kV JAURU TR2 MT RBF FT TR 230/138 kV JAURU TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 886,134.53
  JAURU TR 230/138 kV JAURU TR1 MT RBF FT TR 230/138 kV JAURU TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 886,134.53

 

143 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  JAURU MC 230 kV RTB 230 kV 100,00 Mvar JAURU RT1 MT RB FT RTB 230 kV 100 Mvar JAURU RT1 MT 058/2001 IPCA RBNI REA 8348/2019 14/01/2022 14/01/2051 898,998.60
  JI-PARANA TR 230/69 kV JI-PARANA TR3 RO RBF FT TR 230/69 kV JI-PARANA TR3 RO 058/2001 IPCA RBNI REA 2533/2010 25/08/2014 24/08/2037 1,532.70
  JI-PARANA MG 230 kV JI-PARANA MG1 RO RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBNI REA 7814/2019 13/05/2021 13/05/2053 3,365.63
  JI-PARANA IB 230 kV MG 230 kV JI-PARANA MG1 RO IB1 RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBNI REA 2533/2010 25/08/2014 24/08/2042 9,863.12
  JI-PARANA MC 230 kV RTN 230 kV 0,1 Mvar JI-PARANA RN1 RO RB FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,653.70
  JI-PARANA RTN 230 kV 0,1 Mvar JI-PARANA RN1 RO RB FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  JI-PARANA EL 69 kV JI-PARANA  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  JI-PARANA EL 69 kV JI-PARANA  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  JI-PARANA IB 138 kV MG 230 kV JI-PARANA MG1 RO IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 98,688.84
  JI-PARANA MC 230 kV RTL 230 kV 20 Mvar JI-PARANA RT1 RO RB FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  JI-PARANA MG 230 kV JI-PARANA MG1 RO RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBNI REA 2533/2010 13/08/2019 13/08/2051 121,840.90
  JI-PARANA BC 230 kV 18,5 Mvar JI-PARANA BC3 RO RB FT BC 230 kV 18,5 Mvar JI-PARANA BC3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,929.95
  JI-PARANA BC 230 kV 18,5 Mvar JI-PARANA BC2 RO RB FT BC 230 kV 18,5 Mvar JI-PARANA BC2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,929.95
  JI-PARANA BC 230 kV 18,5 Mvar JI-PARANA BC1 RO RB FT BC 230 kV 18,5 Mvar JI-PARANA BC1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,929.95
  JI-PARANA MC 138 kV TR 230/138 kV JI-PARANA TR2 RO RBF FT TR 230/138 kV JI-PARANA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 127,736.80
  JI-PARANA MC 138 kV TR 230/138 kV JI-PARANA TR1 RO RBF FT TR 230/138 kV JI-PARANA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 127,736.80
  JI-PARANA IB 230 kV MG 230 kV JI-PARANA MG1 RO IB1 RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  JI-PARANA MC 230 kV TR 230/69 kV JI-PARANA TR2 RO RBF FT TR 230/69 kV JI-PARANA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  JI-PARANA MC 230 kV TR 230/69 kV JI-PARANA TR1 RO RBF FT TR 230/69 kV JI-PARANA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  JI-PARANA MC 230 kV TR 230/138 kV JI-PARANA TR2 RO RBF FT TR 230/138 kV JI-PARANA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  JI-PARANA MC 230 kV TR 230/138 kV JI-PARANA TR1 RO RBF FT TR 230/138 kV JI-PARANA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  JI-PARANA MG 230 kV JI-PARANA MG1 RO RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBNI REA 2533/2010 6/6/2014 5/6/2041 183,539.90
  JI-PARANA EL 138 kV JI-PARANA  ROLIM MOURA C1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 190,467.63
  JI-PARANA MC 230 kV BC 230 kV 18,5 Mvar JI-PARANA BC3 RO RB FT BC 230 kV 18,5 Mvar JI-PARANA BC3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 198,093.56
  JI-PARANA MC 230 kV BC 230 kV 18,5 Mvar JI-PARANA BC2 RO RB FT BC 230 kV 18,5 Mvar JI-PARANA BC2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 198,093.56
  JI-PARANA MC 230 kV BC 230 kV 18,5 Mvar JI-PARANA BC1 RO RB FT BC 230 kV 18,5 Mvar JI-PARANA BC1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 198,093.56
  JI-PARANA MC 69 kV TR 230/69 kV JI-PARANA TR1 RO RBF FT TR 230/69 kV JI-PARANA TR1 RO 058/2001 IPCA RBNI REA 2533/2010 7/6/2019 7/6/2053 218,673.47
  JI-PARANA MC 230 kV RTL 230 kV 20 Mvar JI-PARANA RT3 RO RB FT RTL 230 kV 20 Mvar JI-PARANA RT3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 220,163.20
  JI-PARANA RTL 230 kV 20 Mvar JI-PARANA RT1 RO RB FT RTL 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 245,934.80
  JI-PARANA EL 230 kV JI-PARANA LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  JI-PARANA EL 230 kV JI-PARANA LT 230 kV JARU /JI-PARANA C-1 RO RB FT LT 230 kV JARU /JI-PARANA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  JI-PARANA IB 69 kV MG 230 kV JI-PARANA MG1 RO IB1 DIT   058/2001 IPCA RCDM REA 2533/2010 3/11/2015 2/11/2046 293,270.22
  JI-PARANA TR 230/69 kV JI-PARANA TR2 RO RBF FT TR 230/69 kV JI-PARANA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 312,702.63
  JI-PARANA TR 230/69 kV JI-PARANA TR1 RO RBF FT TR 230/69 kV JI-PARANA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 312,702.63
  JI-PARANA MC 69 kV TR 230/69 kV JI-PARANA TR3 RO RBF FT TR 230/69 kV JI-PARANA TR3 RO 058/2001 IPCA RBNI REA 2533/2010 25/08/2014 24/08/2044 357,034.61
  JI-PARANA MC 69 kV TR 230/69 kV JI-PARANA TR2 RO RBF FT TR 230/69 kV JI-PARANA TR2 RO 058/2001 IPCA RBNI REA 2533/2010 3/11/2015 2/11/2045 367,824.95
  JI-PARANA MG 230 kV JI-PARANA MG1 RO RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBNI REA 2533/2010 3/11/2015 2/11/2043 403,986.88
  JI-PARANA TR 230/138 kV JI-PARANA TR2 RO RBF FT TR 230/138 kV JI-PARANA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 421,488.98
  JI-PARANA TR 230/138 kV JI-PARANA TR1 RO RBF FT TR 230/138 kV JI-PARANA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 421,488.98
  JI-PARANA RTL 230 kV 20 Mvar JI-PARANA RLR RO RB FT RTL 230 kV 20 Mvar JI-PARANA RLR RO 058/2001 IPCA RBNI REA 7814/2019 13/05/2021 13/05/2057 474,512.33
  JI-PARANA RTB 230 kV 20 Mvar JI-PARANA RT1 RO RB FT RTB 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBNI REA 2533/2010 6/6/2014 5/6/2049 590,113.81
  JI-PARANA RTL 230 kV 20 Mvar JI-PARANA RT3 RO RB FT RTL 230 kV 20 Mvar JI-PARANA RT3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 663,495.71
  JI-PARANA EL 230 kV JI-PARANA LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 671,879.23
  JI-PARANA EL 230 kV JI-PARANA LT 230 kV ARIQUEMES /JI-PARANA C-3 RO RB FT LT 230 kV ARIQUEMES /JI-PARANA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 671,879.23
  JI-PARANA MG 230 kV JI-PARANA MG1 RO RB FT MG 230 kV JI-PARANA MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 680,365.16
  JI-PARANA MC 230 kV RTB 230 kV 20 Mvar JI-PARANA RT1 RO RB FT RTB 230 kV 20 Mvar JI-PARANA RT1 RO 058/2001 IPCA RBNI REA 2533/2010 6/6/2014 5/6/2044 861,205.98
  JI-PARANA MC 230 kV TR 230/69 kV JI-PARANA TR3 RO RBF FT TR 230/69 kV JI-PARANA TR3 RO 058/2001 IPCA RBNI REA 2533/2010 25/08/2014 24/08/2045 894,942.17
  JI-PARANA TR 230/69 kV JI-PARANA TR3 RO RBF FT TR 230/69 kV JI-PARANA TR3 RO 058/2001 IPCA RBNI REA 2533/2010 25/08/2014 24/08/2039 1,185,208.93
  JORGE TEIXEIRA EL 230 kV JORGE TEIXEIRA LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM 014/2012 IPCA RBL CC 014/2012 1/7/2016 7/5/2042 606,460.36
  JORGE TEIXEIRA EL 230 kV JORGE TEIXEIRA LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 12/7/2040 772,880.95
  JORGE TEIXEIRA EL 230 kV JORGE TEIXEIRA LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 12/7/2040 772,880.95
  LECHUGA IB 138 kV MG 230 kV LECHUGA MG2 AM IB1 DIT   014/2012 IPCA RPEC CC 014/2012 1/4/2015 7/5/2042 259,620.85
  LECHUGA MC 138 kV TR 230/138 kV LECHUGA TR3 AM RBF FT TR 230/138 kV LECHUGA TR3 AM 014/2012 IPCA RBL CC 014/2012 1/4/2015 7/5/2042 321,711.45
  LECHUGA MC 138 kV TR 230/138 kV LECHUGA TR2 AM RBF FT TR 230/138 kV LECHUGA TR2 AM 014/2012 IPCA RBL CC 014/2012 1/4/2015 7/5/2042 321,711.45
  LECHUGA MC 138 kV TR 230/138 kV LECHUGA TR1 AM RBF FT TR 230/138 kV LECHUGA TR1 AM 014/2012 IPCA RBL CC 014/2012 1/4/2015 7/5/2042 321,711.45
  LECHUGA MC 230 kV TR 230/138 kV LECHUGA TR3 AM RBF FT TR 230/138 kV LECHUGA TR3 AM 014/2012 IPCA RBL CC 014/2012 1/4/2015 7/5/2042 431,136.71
  LECHUGA MC 230 kV TR 230/138 kV LECHUGA TR2 AM RBF FT TR 230/138 kV LECHUGA TR2 AM 014/2012 IPCA RBL CC 014/2012 1/4/2015 7/5/2042 431,136.71
  LECHUGA MC 230 kV TR 230/138 kV LECHUGA TR1 AM RBF FT TR 230/138 kV LECHUGA TR1 AM 014/2012 IPCA RBL CC 014/2012 1/4/2015 7/5/2042 431,136.71
  LECHUGA EL 138 kV LECHUGA  DIST3 DIT   014/2012 IPCA RPEC CC 014/2012 1/4/2015 7/5/2042 452,103.86
  LECHUGA EL 138 kV LECHUGA  DIST2 DIT   014/2012 IPCA RPEC CC 014/2012 1/4/2015 7/5/2042 452,103.86
  LECHUGA EL 138 kV LECHUGA  DIST1 DIT   014/2012 IPCA RPEC CC 014/2012 1/4/2015 7/5/2042 452,103.86
  LECHUGA EL 230 kV LECHUGA LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM 014/2012 IPCA RBL CC 014/2012 1/7/2016 7/5/2042 606,460.36
  LECHUGA EL 230 kV LECHUGA LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 12/7/2040 772,880.95
  LECHUGA EL 230 kV LECHUGA LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 12/7/2040 772,880.95
  LECHUGA MG 230 kV LECHUGA MG2 AM RB FT MG 230 kV LECHUGA MG2 AM 014/2012 IPCA RBL CC 014/2012 1/4/2015 7/5/2042 930,854.50
  LECHUGA TR 230/138 kV LECHUGA TR3 AM RBF FT TR 230/138 kV LECHUGA TR3 AM 014/2012 IPCA RBL CC 014/2012 1/4/2015 7/5/2042 1,656,032.15
  LECHUGA TR 230/138 kV LECHUGA TR2 AM RBF FT TR 230/138 kV LECHUGA TR2 AM 014/2012 IPCA RBL CC 014/2012 1/4/2015 7/5/2042 1,656,032.15
  LECHUGA TR 230/138 kV LECHUGA TR1 AM RBF FT TR 230/138 kV LECHUGA TR1 AM 014/2012 IPCA RBL CC 014/2012 1/4/2015 7/5/2042 1,656,032.15
  LT 138 kV C. MAGALHAES /RONDONOPOLIS MT LT 138 kV C. MAGALHAES /RONDONOPOLIS C-1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 2,543,321.70
  LT 138 kV RONDONOPOLIS /COXIPO MT LT 138 kV RONDONOPOLIS /COXIPO C-1 MT DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 2,686,204.94
  LT 138 kV TUCURUI VILA /CAMETA PA LT 138 kV TUCURUI VILA /CAMETA C-1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,060,701.92
  LT 138 kV TUCURUI VILA /CAMETA PA LT 138 kV TUCURUI VILA /CAMETA C-1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 3,398,156.21
  LT 138 kV TUCURUI VILA /CAMETA PA LT 138 kV TUCURUI VILA /CAMETA C-1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 5,958,267.95
  LT 230 kV ABUNA /PORTO VELHO RO LT 230 kV ABUNA /PORTO VELHO C-1 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,900,424.14
  LT 230 kV ABUNA /PORTO VELHO RO LT 230 kV ABUNA /PORTO VELHO C-2 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 15,052,834.95
  LT 230 kV ABUNA /RIO BRANCO 1 RO/AC LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,275,948.42
  LT 230 kV ABUNA /RIO BRANCO 1 RO/AC LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 23,709,055.02
  LT 230 kV ALTAMIRA /TRANSAMAZONIC PA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2044 8,237.27
  LT 230 kV ALTAMIRA /TRANSAMAZONIC PA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,878,639.86
  LT 230 kV ALTAMIRA /TRANSAMAZONIC PA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,306,274.98
  LT 230 kV ALTAMIRA /TRANSAMAZONIC PA LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,550,547.60
  LT 230 kV ARIQUEMES /JARU RO LT 230 kV ARIQUEMES /JARU C-1 RO RB FT LT 230 kV ARIQUEMES /JARU C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,668,600.35
  LT 230 kV ARIQUEMES /JI-PARANA RO LT 230 kV ARIQUEMES /JI-PARANA C-3 RO RB FT LT 230 kV ARIQUEMES /JI-PARANA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 12,899,494.01
  LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,383,827.77
  LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,497,728.46
  LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,867,161.83

 

144 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,993,620.51
  LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 8,533,996.84
  LT 230 kV BARRA PEIXE /RONDONOPOLIS MT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 8,755,727.28
  LT 230 kV CARAJAS /INTEGRADORA PA LT 230 kV CARAJAS /INTEGRADORA C-3 PA RB FT LT 230 kV CARAJAS /INTEGRADORA C-3 PA 058/2001 IPCA RBNI REA 4658/2014 2/9/2013 31/12/2042 2,049,507.14
  LT 230 kV CARAJAS /INTEGRADORA PA LT 230 kV CARAJAS /INTEGRADORA C-2 PA RB FT LT 230 kV CARAJAS /INTEGRADORA C-2 PA 058/2001 IPCA RBNI REA 4658/2014 2/9/2013 31/12/2042 2,049,507.14
  LT 230 kV CARAJAS /MARABA PA LT 230 kV CARAJAS /MARABA C-1 PA RB FT LT 230 kV CARAJAS /MARABA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,039,426.26
  LT 230 kV CASTANHAL /SANTA MARIA PA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2047 40,479.82
  LT 230 kV CASTANHAL /SANTA MARIA PA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 644,819.47
  LT 230 kV CASTANHAL /SANTA MARIA PA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 715,913.32
  LT 230 kV CASTANHAL /SANTA MARIA PA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,255,269.96
  LT 230 kV COELHO NETO /TERESINA MA/PI LT 230 kV COELHO NETO /TERESINA C-1 MA/PI RB FT LT 230 kV COELHO NETO /TERESINA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,676,354.86
  LT 230 kV COLETORA PORTO VELHO /PORTO VELHO RO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 535,786.32
  LT 230 kV COLETORA PORTO VELHO /PORTO VELHO RO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 535,786.32
  LT 230 kV COXIPO /NOBRES MT LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBNI REA 2384/2010 20/12/2012 19/12/2049 64,492.78
  LT 230 kV COXIPO /NOBRES MT LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,332,163.18
  LT 230 kV COXIPO /NOBRES MT LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,589,293.24
  LT 230 kV COXIPO /NOBRES MT LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,540,021.70
  LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-2 PA RB FT LT 230 kV GUAMA /MARITUBA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,071.36
  LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-1 PA RB FT LT 230 kV GUAMA /MARITUBA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,071.36
  LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-2 PA RB FT LT 230 kV GUAMA /MARITUBA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 260,988.89
  LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-1 PA RB FT LT 230 kV GUAMA /MARITUBA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 260,988.89
  LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-2 PA RB FT LT 230 kV GUAMA /MARITUBA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 457,613.39
  LT 230 kV GUAMA /MARITUBA PA LT 230 kV GUAMA /MARITUBA C-1 PA RB FT LT 230 kV GUAMA /MARITUBA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 457,613.39
  LT 230 kV GUAMA /UTINGA PA LT 230 kV GUAMA /UTINGA C-2 PA RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 343,150.15
  LT 230 kV GUAMA /UTINGA PA LT 230 kV GUAMA /UTINGA C-2 PA RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 380,983.79
  LT 230 kV GUAMA /UTINGA PA LT 230 kV GUAMA /UTINGA C-2 PA RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 668,010.34
  LT 230 kV IMPERATRIZ /PORTO FRANCO MA LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,284,860.16
  LT 230 kV IMPERATRIZ /PORTO FRANCO MA LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,536,774.88
  LT 230 kV IMPERATRIZ /PORTO FRANCO MA LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,447,936.92
  LT 230 kV JARU /JI-PARANA RO LT 230 kV JARU /JI-PARANA C-1 RO RB FT LT 230 kV JARU /JI-PARANA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,734,727.18
  LT 230 kV JAURU /VARZEA GRANDE MT LT 230 kV JAURU /VARZEA GRANDE C-2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 8/7/2016 7/7/2052 277,835.36
  LT 230 kV JAURU /VARZEA GRANDE MT LT 230 kV JAURU /VARZEA GRANDE C-2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4530/2014 3/10/2014 2/10/2042 406,981.60
  LT 230 kV JAURU /VARZEA GRANDE MT LT 230 kV JAURU /VARZEA GRANDE C-2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,480,904.57
  LT 230 kV JAURU /VARZEA GRANDE MT LT 230 kV JAURU /VARZEA GRANDE C-1 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,595,843.15
  LT 230 kV JI-PARANA /PIMENTA BUENO RO LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,443,989.17
  LT 230 kV JI-PARANA /PIMENTA BUENO RO LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 9,303,272.64
  LT 230 kV JORGE TEIXEIRA /LECHUGA AM LT 138 kV JORGE TEIXEIRA /LECHUGA C-0 AM DIT   014/2012 IPCA RCDM REA 5060/2015 29/10/2015 28/10/2043 184,664.50
  LT 230 kV JORGE TEIXEIRA /LECHUGA AM LT 138 kV JORGE TEIXEIRA /LECHUGA C-0 AM DIT   014/2012 IPCA RCDM REA 5060/2015 29/10/2015 28/10/2043 218,695.85
  LT 230 kV JORGE TEIXEIRA /LECHUGA AM LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-2 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 12/7/2040 2,140,792.48
  LT 230 kV JORGE TEIXEIRA /LECHUGA AM LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-1 AM 009/2010 IPCA RBL CC 009/2010 17/03/2014 12/7/2040 2,140,792.48
  LT 230 kV JORGE TEIXEIRA /LECHUGA AM LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM RB FT LT 230 kV JORGE TEIXEIRA /LECHUGA C-3 AM 014/2012 IPCA RBL CC 014/2012 1/7/2016 7/5/2042 2,547,423.42
  LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-2 PA RB FT LT 230 kV MARITUBA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,078.79
  LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-1 PA RB FT LT 230 kV MARITUBA /UTINGA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 108,078.79
  LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-2 PA RB FT LT 230 kV MARITUBA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 119,994.89
  LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-1 PA RB FT LT 230 kV MARITUBA /UTINGA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 119,994.89
  LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-2 PA RB FT LT 230 kV MARITUBA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 210,396.96
  LT 230 kV MARITUBA /UTINGA PA LT 230 kV MARITUBA /UTINGA C-1 PA RB FT LT 230 kV MARITUBA /UTINGA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 210,396.96
  LT 230 kV MIRANDA II /PERITORO MA LT 230 kV MIRANDA II /PERITORO C-1 MA RB FT LT 230 kV MIRANDA II /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,970,959.01
  LT 230 kV NOBRES /NOVA MUTUM MT LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,169,507.19
  LT 230 kV NOBRES /NOVA MUTUM MT LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,408,703.80
  LT 230 kV NOBRES /NOVA MUTUM MT LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,223,379.31
  LT 230 kV NOVA MUTUM /SORRISO MT LT 230 kV NOVA MUTUM /SORRISO C-1 MT RB FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,008,305.85
  LT 230 kV NOVA MUTUM /SORRISO MT LT 230 kV NOVA MUTUM /SORRISO C-1 MT RB FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,339,983.27
  LT 230 kV NOVA MUTUM /SORRISO MT LT 230 kV NOVA MUTUM /SORRISO C-1 MT RB FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,856,268.53
  LT 230 kV P.DUTRA /PERITORO MA LT 230 kV P.DUTRA /PERITORO C-1 MA RB FT LT 230 kV P.DUTRA /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,188,801.85
  LT 230 kV PERITORO /COELHO NETO MA LT 230 kV PERITORO /COELHO NETO C-1 MA RB FT LT 230 kV PERITORO /COELHO NETO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,626,566.93
  LT 230 kV PIMENTA BUENO /VILHENA RO LT 230 kV PIMENTA BUENO /VILHENA C-1 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,325,733.99
  LT 230 kV PIMENTA BUENO /VILHENA RO LT 230 kV PIMENTA BUENO /VILHENA C-3 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 12,586,778.30
  LT 230 kV RIB.GONCALVES /BALSAS PI/MA LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA RB FT LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 2,460,944.86
  LT 230 kV RONDONOPOLIS /COXIPO MT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,894,200.06
  LT 230 kV RONDONOPOLIS /COXIPO MT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,894,200.06
  LT 230 kV RONDONOPOLIS /COXIPO MT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,323,550.76
  LT 230 kV RONDONOPOLIS /COXIPO MT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,323,550.76
  LT 230 kV RONDONOPOLIS /COXIPO MT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,580,838.65
  LT 230 kV SAMUEL /ARIQUEMES RO LT 230 kV SAMUEL /ARIQUEMES C-1 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,143,783.35
  LT 230 kV SAMUEL /ARIQUEMES RO LT 230 kV SAMUEL /ARIQUEMES C-3 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 12,039,526.97
  LT 230 kV SAMUEL /PORTO VELHO RO LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 671,398.53
  LT 230 kV SAMUEL /PORTO VELHO RO LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 671,398.53
  LT 230 kV SAMUEL /PORTO VELHO RO LT 230 kV SAMUEL /PORTO VELHO C-3 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 3,283,507.99
  LT 230 kV SAO LUIS II /MIRANDA II MA LT 230 kV SAO LUIS II /MIRANDA II C-1 MA RB FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2048 19,116.89
  LT 230 kV SAO LUIS II /MIRANDA II MA LT 230 kV SAO LUIS II /MIRANDA II C-1 MA RB FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,189,424.25
  LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 424,482.33
  LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 433,610.98
  LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 471,283.16
  LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 481,418.28
  LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 826,339.68
  LT 230 kV SAO LUIS II /SAO LUIS I MA LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 844,110.43
  LT 230 kV SAO LUIS II /SAO LUIS III MA LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 1,712,017.49
  LT 230 kV SINOP /SORRISO II MT LT 230 kV SINOP /SORRISO II C-1 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,825.28
  LT 230 kV SINOP /SORRISO II MT LT 230 kV SINOP /SORRISO II C-1 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 9,798.30
  LT 230 kV SINOP /SORRISO II MT LT 230 kV SINOP /SORRISO II C-1 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 17,180.17
  LT 230 kV SORRISO II /SORRISO MT LT 230 kV SORRISO II /SORRISO C-1 MT RB FT LT 230 kV SORRISO II /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,705.88
  LT 230 kV SORRISO II /SORRISO MT LT 230 kV SORRISO II /SORRISO C-1 MT RB FT LT 230 kV SORRISO II /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 9,665.74
  LT 230 kV SORRISO II /SORRISO MT LT 230 kV SORRISO II /SORRISO C-1 MT RB FT LT 230 kV SORRISO II /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 16,947.74
  LT 230 kV TRANSAMAZONIC /RUROPOLIS PA LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2045 6,981.14
  LT 230 kV TRANSAMAZONIC /RUROPOLIS PA LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,968,264.27

 

145 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 230 kV TRANSAMAZONIC /RUROPOLIS PA LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,295,526.94
  LT 230 kV TRANSAMAZONIC /RUROPOLIS PA LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,778,319.58
  LT 230 kV TUCURUI /ALTAMIRA PA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBNI REA 3216/2011 2/7/2015 1/7/2052 61,538.21
  LT 230 kV TUCURUI /ALTAMIRA PA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,757,899.76
  LT 230 kV TUCURUI /ALTAMIRA PA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 7,502,984.49
  LT 230 kV TUCURUI /ALTAMIRA PA LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 13,155,602.41
  LT 230 kV UTINGA /CASTANHAL PA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2047 107,946.20
  LT 230 kV UTINGA /CASTANHAL PA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBNI REA 6029/2016 12/7/2019 12/7/2047 764,368.97
  LT 230 kV UTINGA /CASTANHAL PA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,289,832.40
  LT 230 kV UTINGA /CASTANHAL PA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,432,041.44
  LT 230 kV UTINGA /CASTANHAL PA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,510,916.53
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2052 20,380.62
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2052 20,380.62
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,176.11
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,176.11
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 187,828.43
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 187,828.43
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 329,335.11
  LT 230 kV UTINGA /MIRAMAR PA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 329,335.11
  LT 230 kV VARZEA GRANDE /COXIPO MT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT 058/2001 IPCA RBNI REA 4967/2014 21/06/2016 20/06/2052 277,571.65
  LT 230 kV VARZEA GRANDE /COXIPO MT LT 230 kV VARZEA GRANDE /COXIPO C-1 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 376,328.63
  LT 230 kV VARZEA GRANDE /COXIPO MT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 491,267.22
  LT 230 kV VILA DO CONDE /GUAMA PA LT 230 kV VILA DO CONDE /GUAMA C-2 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 802,894.39
  LT 230 kV VILA DO CONDE /GUAMA PA LT 230 kV VILA DO CONDE /GUAMA C-1 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 802,894.39
  LT 230 kV VILA DO CONDE /GUAMA PA LT 230 kV VILA DO CONDE /GUAMA C-2 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 891,416.61
  LT 230 kV VILA DO CONDE /GUAMA PA LT 230 kV VILA DO CONDE /GUAMA C-1 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 891,416.61
  LT 230 kV VILHENA /JAURU RO/MT LT 230 kV VILHENA /JAURU C-3 RO/MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 26,328,384.69
  LT 230 kV XINGU /RL (TUCURUI / ALTAMIRA) PA LT 230 kV XINGU /RL (TUCURUI / ALTAMIRA) C-1 PA RB FT LT 230 kV XINGU /RL (ALTAMIRA / TUCURUI) C-1 PA 058/2001 IPCA RBNI REA 4472/2014 1/10/2014 31/12/2042 22,436.58
  LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-1 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,469,005.65
  LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-2 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,471,636.18
  LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-1 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,851,477.01
  LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-2 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,854,397.56
  LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-1 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,753,112.76
  LT 500 kV BACABEIRA /MIRANDA II MA LT 500 kV BACABEIRA /MIRANDA II C-2 MA RB FT LT 500 kV BACABEIRA /MIRANDA II C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,758,233.60
  LT 500 kV COLINAS /MIRACEMA TO LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,810,767.93
  LT 500 kV COLINAS /MIRACEMA TO LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 9,782,189.35
  LT 500 kV COLINAS /MIRACEMA TO LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 17,151,920.55
  LT 500 kV IMPERATRIZ /COLINAS MA/TO LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 17,349,586.08
  LT 500 kV IMPERATRIZ /COLINAS MA/TO LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 19,262,445.40
  LT 500 kV IMPERATRIZ /COLINAS MA/TO LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO RB FT LT 500 kV IMPERATRIZ /COLINAS C-1 MA/TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 33,774,436.50
  LT 500 kV IMPERATRIZ /MARABA MA/PA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,219,958.67
  LT 500 kV IMPERATRIZ /MARABA MA/PA LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,232,112.85
  LT 500 kV IMPERATRIZ /MARABA MA/PA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 10,236,494.96
  LT 500 kV IMPERATRIZ /MARABA MA/PA LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 10,249,989.19
  LT 500 kV IMPERATRIZ /MARABA MA/PA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 17,948,492.10
  LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 19,515,055.89
  LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 19,515,055.89
  LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 21,666,666.67
  LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 21,666,666.67
  LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 37,989,956.23
  LT 500 kV IMPERATRIZ /P.DUTRA MA LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 37,989,956.23
  LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 11,242,616.86
  LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 11,242,616.86
  LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 12,482,159.08
  LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 12,482,159.08
  LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 21,886,000.48
  LT 500 kV MARABA /TUCURUI PA LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 21,886,000.48
  LT 500 kV MIRANDA II /P.DUTRA MA LT 500 kV MIRANDA II /P.DUTRA C-1 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,883,374.35
  LT 500 kV MIRANDA II /P.DUTRA MA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 9,961,363.68
  LT 500 kV MIRANDA II /P.DUTRA MA LT 500 kV MIRANDA II /P.DUTRA C-1 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 10,973,054.80
  LT 500 kV MIRANDA II /P.DUTRA MA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 11,059,642.75
  LT 500 kV MIRANDA II /P.DUTRA MA LT 500 kV MIRANDA II /P.DUTRA C-1 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 19,239,963.30
  LT 500 kV MIRANDA II /P.DUTRA MA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 19,391,785.11
  LT 500 kV P.DUTRA /B. ESPERANCA MA/PI LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,370,554.42
  LT 500 kV P.DUTRA /B. ESPERANCA MA/PI LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 11,513,948.36
  LT 500 kV P.DUTRA /B. ESPERANCA MA/PI LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 20,188,356.65
  LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,873,769.48
  LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,875,190.34
  LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,080,359.85
  LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,081,937.37
  LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,647,666.75
  LT 500 kV SAO LUIS II /BACABEIRA MA LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,650,432.75
  LT 500 kV TUCURUI /VILA DO CONDE PA LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 16,543,865.21
  LT 500 kV TUCURUI /VILA DO CONDE PA LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 18,367,890.67
  LT 500 kV TUCURUI /VILA DO CONDE PA LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 32,205,939.80
  LT 69 kV TUCURUI /TUCURUI VILA PA LT 69 kV TUCURUI /TUCURUI VILA C-1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 36,640.46
  LT 69 kV TUCURUI /TUCURUI VILA PA LT 69 kV TUCURUI /TUCURUI VILA C-1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 40,680.21
  LT 69 kV TUCURUI /TUCURUI VILA PA LT 69 kV TUCURUI /TUCURUI VILA C-1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 71,327.97
  LUCAS RIO VERDE MG 230 kV LUCAS RIO VERDE MG2 MT RB FT MG 230 kV LUCAS RIO VERDE MG2 MT 004/2011 IPCA RBNIA REA 9241/2020     77,908.74
  LUCAS RIO VERDE MG 230 kV LUCAS RIO VERDE MG2 MT RB FT MG 230 kV LUCAS RIO VERDE MG2 MT 004/2011 IPCA RBNIA REA 9241/2020     121,871.92
  LUCAS RIO VERDE IB 138 kV MG 230 kV LUCAS RIO VERDE MG2 MT IB1 DIT   004/2011 IPCA RPEC CC 004/2011 28/06/2011 28/06/2041 179,115.97
  LUCAS RIO VERDE IB 230 kV MG 230 kV LUCAS RIO VERDE MG2 MT IB1 RB FT MG 230 kV LUCAS RIO VERDE MG2 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041 254,961.27
  LUCAS RIO VERDE MC 138 kV TR 230/138 kV LUCAS RIO VERDE TR1 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TR1 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041 255,420.11
  LUCAS RIO VERDE MC 230 kV TR 230/138 kV LUCAS RIO VERDE TR1 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TR1 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041 337,198.75
  LUCAS RIO VERDE EL 138 kV LUCAS RIO VERDE  DIST2 DIT   004/2011 IPCA RPEC CC 004/2011 28/06/2011 28/06/2041 347,270.68
  LUCAS RIO VERDE EL 138 kV LUCAS RIO VERDE  DIST1 DIT   004/2011 IPCA RPEC CC 004/2011 28/06/2011 28/06/2041 347,270.68

 

146 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LUCAS RIO VERDE TR 230/138 kV LUCAS RIO VERDE TRR1 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TRR1 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041 358,938.05
  LUCAS RIO VERDE MG 230 kV LUCAS RIO VERDE MG2 MT RB FT MG 230 kV LUCAS RIO VERDE MG2 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041 729,616.51
  LUCAS RIO VERDE TR 230/138 kV LUCAS RIO VERDE TR1 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TR1 MT 004/2011 IPCA RBL CC 004/2011 28/06/2013 28/06/2041 1,076,812.44
  LUCAS RIO VERDE MC 230 kV TR 230/138 kV LUCAS RIO VERDE TR2 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TR2 MT 004/2011 IPCA RBNIA REA 9241/2020     1,240,262.05
  LUCAS RIO VERDE MC 138 kV TR 230/138 kV LUCAS RIO VERDE TR2 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TR2 MT 004/2011 IPCA RBNIA REA 9241/2020     1,352,471.71
  LUCAS RIO VERDE TR 230/138 kV LUCAS RIO VERDE TR2 MT RBF FT TR 230/138 kV LUCAS RIO VERDE TR2 MT 004/2011 IPCA RBNIA REA 9241/2020     2,103,652.55
  MARABA TR 230/13,8 kV MARABA TF1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RMEL REN 443/2011 16/12/2016 15/12/2030 32,296.38
  MARABA EL 230 kV MARABA  DIST1 DIT   058/2001 IPCA RMEL REA 2837/2011 30/12/2013 29/12/2036 34,430.01
  MARABA MC 500 kV RTL 500 kV 136 MVAr MARABA RT2 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RMEL REA 2837/2011 30/12/2013 29/12/2036 35,799.17
  MARABA MC 230 kV TR 500/230 kV MARABA TR1 PA RB FT TR 500/230 kV MARABA TR1 PA 058/2001 IPCA RMEL REA 2837/2011 30/12/2013 29/12/2036 35,799.17
  MARABA EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RMEL REA 2837/2011 30/12/2013 29/12/2036 35,799.17
  MARABA TR 500/230 kV MARABA TRR2 PA RB FT TR 500/230 kV MARABA TRR2 PA 058/2001 IPCA RMEL REN 443/2011 3/7/2016 2/7/2030 47,667.94
  MARABA IB 69 kV MG 500 kV MARABA MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,894.81
  MARABA EL 13,8 kV MARABA  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  MARABA MC 13,8 kV CS 150/-90 MVAr MARABA CS1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,646.29
  MARABA MC 69 kV TR 230/69 kV MARABA TF3 PA RBF FT TR 230/69 kV MARABA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  MARABA MC 69 kV TR 230/69 kV MARABA TF2 PA RBF FT TR 230/69 kV MARABA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  MARABA EL 69 kV MARABA  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  MARABA EL 69 kV MARABA  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  MARABA EL 69 kV MARABA  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  MARABA EL 69 kV MARABA  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,493.13
  MARABA MC 230 kV TR 500/230 kV MARABA TR2 PA RB FT TR 500/230 kV MARABA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  MARABA MC 230 kV TR 500/230 kV MARABA TR1 PA RB FT TR 500/230 kV MARABA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  MARABA MC 230 kV TR 230/69 kV MARABA TF3 PA RBF FT TR 230/69 kV MARABA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  MARABA MC 230 kV TR 230/69 kV MARABA TF2 PA RBF FT TR 230/69 kV MARABA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  MARABA MC 230 kV TR 230/13,8 kV MARABA TF1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  MARABA TR 230/69 kV MARABA TF3 PA RBF FT TR 230/69 kV MARABA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 208,679.14
  MARABA TR 230/69 kV MARABA TF2 PA RBF FT TR 230/69 kV MARABA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 208,679.14
  MARABA TR 230/69 kV MARABA TF3 PA RBF FT TR 230/69 kV MARABA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 231,686.83
  MARABA TR 230/69 kV MARABA TF2 PA RBF FT TR 230/69 kV MARABA TF2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 231,686.83
  MARABA EL 230 kV MARABA  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  MARABA EL 230 kV MARABA  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  MARABA RTL 500 kV 45,45 Mvar MARABA RTR2 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,346.74
  MARABA RTL 500 kV 45,45 Mvar MARABA RTR1 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,346.74
  MARABA EL 230 kV MARABA  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 285,067.43
  MARABA EL 230 kV MARABA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 285,067.43
  MARABA MC 500 kV RTL 500 kV 136 MVAr MARABA RT4 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  MARABA MC 500 kV RTL 500 kV 136 MVAr MARABA RT3 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  MARABA MC 500 kV RTL 500 kV 136 MVAr MARABA RT2 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  MARABA MC 500 kV RTL 500 kV 136 MVAr MARABA RT1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  MARABA RTB 500 kV 55 Mvar MARABA RTR3 PA RB FT RTB 500 kV 55 Mvar MARABA RTR3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,090.37
  MARABA RTB 500 kV 55 Mvar MARABA RTR1 PA RB FT RTB 500 kV 55 Mvar MARABA RTR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 302,090.37
  MARABA RTL 500 kV 45,45 Mvar MARABA RTR2 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 315,697.08
  MARABA RTL 500 kV 45,45 Mvar MARABA RTR1 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 315,697.08
  MARABA MC 69 kV TR 230/69 kV MARABA TR3 PA RBF FT TR 230/69 kV MARABA TR3 PA 058/2001 IPCA RBNI REA 2533/2010 28/01/2013 27/01/2042 343,368.17
  MARABA RTL 500 kV 136 MVAr MARABA RT4 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 386,316.79
  MARABA RTL 500 kV 136 MVAr MARABA RT3 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 386,316.79
  MARABA RTL 500 kV 136 MVAr MARABA RT2 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 386,316.79
  MARABA RTL 500 kV 136 MVAr MARABA RT1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 386,316.79
  MARABA MC 500 kV RTB 500 kV 165 Mvar MARABA RT6 PA RB FT RTB 500 kV 165 Mvar MARABA RT6 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,570.80
  MARABA RTB 500 kV 165 Mvar MARABA RT8 PA RB FT RTB 500 kV 165 Mvar MARABA RT8 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 404,299.54
  MARABA RTB 500 kV 165 Mvar MARABA RT6 PA RB FT RTB 500 kV 165 Mvar MARABA RT6 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 404,299.54
  MARABA RTB 500 kV 165 Mvar MARABA RT10 PA RB FT RTB 500 kV 165 Mvar MARABA RT10 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 404,299.54
  MARABA RTL 500 kV 136 MVAr MARABA RT4 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 428,909.72
  MARABA RTL 500 kV 136 MVAr MARABA RT3 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 428,909.72
  MARABA RTL 500 kV 136 MVAr MARABA RT2 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 428,909.72
  MARABA RTL 500 kV 136 MVAr MARABA RT1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 428,909.72
  MARABA MC 500 kV RTB 500 kV 165 Mvar MARABA RT8 PA RB FT RTB 500 kV 165 Mvar MARABA RT8 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 441,123.86
  MARABA MC 500 kV RTB 500 kV 165 Mvar MARABA RT10 PA RB FT RTB 500 kV 165 Mvar MARABA RT10 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 441,123.86
  MARABA MC 500 kV TR 500/230 kV MARABA TR2 PA RB FT TR 500/230 kV MARABA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 471,137.52
  MARABA MC 500 kV TR 500/230 kV MARABA TR1 PA RB FT TR 500/230 kV MARABA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 471,137.52
  MARABA TR 230/13,8 kV MARABA TRR1 PA RB FT TR 230/13,8 kV MARABA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 483,366.68
  MARABA TR 230/13,8 kV MARABA TF1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 483,366.68
  MARABA EL 230 kV MARABA  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 499,832.27
  MARABA EL 230 kV MARABA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 499,832.27
  MARABA IB 500 kV MG 500 kV MARABA MG1 PA IB7 RB FT MG 500 kV MARABA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  MARABA EL 500 kV MARABA LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  MARABA EL 500 kV MARABA LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  MARABA EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  MARABA EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  MARABA TR 230/13,8 kV MARABA TF1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 536,659.74
  MARABA TR 500/230 kV MARABA TRR1 PA RB FT TR 500/230 kV MARABA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 551,295.46
  MARABA RTL 500 kV 45,45 Mvar MARABA RTR2 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 553,537.76
  MARABA RTL 500 kV 45,45 Mvar MARABA RTR1 PA RB FT RTL 500 kV 45,45 Mvar MARABA RTR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 553,537.76
  MARABA EL 500 kV MARABA LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  MARABA EL 500 kV MARABA LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  MARABA TR 500/230 kV MARABA TRR1 PA RB FT TR 500/230 kV MARABA TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 612,077.92
  MARABA TR 500/230 kV MARABA TRR2 PA RB FT TR 500/230 kV MARABA TRR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 642,678.04
  MARABA RTL 500 kV 136 MVAr MARABA RT4 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-2 MA/PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 752,042.84
  MARABA RTL 500 kV 136 MVAr MARABA RT3 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 752,042.84
  MARABA RTL 500 kV 136 MVAr MARABA RT2 PA RB FT LT 500 kV IMPERATRIZ /MARABA C-1 MA/PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 752,042.84
  MARABA RTL 500 kV 136 MVAr MARABA RT1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 752,042.84
  MARABA TR 230/69 kV MARABA TR3 PA RBF FT TR 230/69 kV MARABA TR3 PA 058/2001 IPCA RBNI REA 2533/2010 28/01/2013 27/01/2047 885,703.95
  MARABA MC 230 kV TR 230/69 kV MARABA TR3 PA RBF FT TR 230/69 kV MARABA TR3 PA 058/2001 IPCA RBNI REA 2533/2010 28/01/2013 27/01/2042 904,318.28
  MARABA CR 500 kV 283 MVAr MARABA BC2 PA RB FT CR 500 kV 283 MVAr MARABA BC2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,048,772.07
  MARABA CR 500 kV 283 MVAr MARABA BC2 PA RB FT CR 500 kV 283 MVAr MARABA BC2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,164,403.27

 

147 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MARABA CR 500 kV 348 MVAr MARABA BC1 PA RB FT CR 500 kV 348 MVAr MARABA BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,258,803.11
  MARABA CR 500 kV 348 MVAr MARABA BC1 PA RB FT CR 500 kV 348 MVAr MARABA BC1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,397,591.05
  MARABA TR 500/230 kV MARABA TR1 PA RB FT TR 500/230 kV MARABA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,653,886.37
  MARABA CS 150/-90 MVAr MARABA CS1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,747,929.80
  MARABA TR 500/230 kV MARABA TR1 PA RB FT TR 500/230 kV MARABA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,836,233.77
  MARABA TR 500/230 kV MARABA TR2 PA RB FT TR 500/230 kV MARABA TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,928,034.12
  MARABA CS 150/-90 MVAr MARABA CS1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,940,645.86
  MARABA CR 500 kV 283 MVAr MARABA BC2 PA RB FT CR 500 kV 283 MVAr MARABA BC2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,041,644.43
  MARABA MG 500 kV MARABA MG1 PA RB FT MG 500 kV MARABA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,097,261.10
  MARABA CR 500 kV 348 MVAr MARABA BC1 PA RB FT CR 500 kV 348 MVAr MARABA BC1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,450,511.83
  MARABA CS 150/-90 MVAr MARABA CS1 PA RB FT CS 150/-90 MVAr MARABA CS1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,402,694.67
  MIRACEMA MC 69 kV RTN 69 kV 0 Mvar MIRACEMA RN2 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,653.70
  MIRACEMA MC 69 kV RTN 69 kV 0 Mvar MIRACEMA RN1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,653.70
  MIRACEMA RTN 69 kV 0 Mvar MIRACEMA RN2 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  MIRACEMA RTN 69 kV 0 Mvar MIRACEMA RN1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  MIRACEMA MG 500 kV MIRACEMA MG1 TO RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBNI REA 6502/2017 18/10/2019 18/10/2050 20,560.14
  MIRACEMA MC 138 kV TR 500/138 kV MIRACEMA TF1 TO RBF FT TR 500/138 kV MIRACEMA TF1 TO 058/2001 IPCA RBNI REA 2911/2011 27/11/2013 26/11/2041 62,046.15
  MIRACEMA CR 500 kV 161 MVAr MIRACEMA BC1 TO RB FT CR 500 kV 161 MVAr MIRACEMA BC1 TO 058/2001 IPCA RBNI REA 6502/2017 28/11/2019 28/11/2039 69,691.83
  MIRACEMA MC 138 kV TR 500/138 kV MIRACEMA TF1 TO RBF FT TR 500/138 kV MIRACEMA TF1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 127,736.80
  MIRACEMA MC 500 kV RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBNI REA 5861/2016 3/6/2019 2/6/2034 178,060.75
  MIRACEMA EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBNI REA 6502/2017 17/05/2019 17/05/2047 190,204.09
  MIRACEMA MC 500 kV RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBNI REA 6502/2017 9/7/2019 9/7/2047 208,171.70
  MIRACEMA RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO RB FT RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,346.74
  MIRACEMA RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO RB FT RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,449.03
  MIRACEMA RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO RB FT RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 315,697.08
  MIRACEMA RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO RB FT RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 315,810.65
  MIRACEMA MC 500 kV CR 500 kV 161 MVAr MIRACEMA BC1 TO RB FT CR 500 kV 161 MVAr MIRACEMA BC1 TO 058/2001 IPCA RBNI REA 6502/2017 14/10/2019 14/10/2051 355,670.16
  MIRACEMA MC 500 kV RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,570.80
  MIRACEMA TR 500/138 kV MIRACEMA TRR1 TO RBF FT TR 500/138 kV MIRACEMA TRR1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 415,751.49
  MIRACEMA MC 500 kV RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 448,066.05
  MIRACEMA MC 500 kV TR 500/138 kV MIRACEMA TF1 TO RBF FT TR 500/138 kV MIRACEMA TF1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 471,137.52
  MIRACEMA IB 500 kV MG 500 kV MIRACEMA MG1 TO IB1 RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  MIRACEMA EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  MIRACEMA EL 500 kV MIRACEMA LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  MIRACEMA RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO RB FT RTL 500 kV 45,45 MVAr MIRACEMA RTR1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 553,537.76
  MIRACEMA RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO RB FT RTL 500 kV 45,5 Mvar MIRACEMA RTR2 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 553,736.89
  MIRACEMA IB 500 kV MG 500 kV MIRACEMA MG1 TO IB1 RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  MIRACEMA MG 500 kV MIRACEMA MG1 TO RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 566,845.54
  MIRACEMA EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  MIRACEMA EL 500 kV MIRACEMA LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  MIRACEMA MG 500 kV MIRACEMA MG1 TO RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 629,342.47
  MIRACEMA MC 138 kV TR 500/138 kV MIRACEMA TR2 TO RBF FT TR 500/138 kV MIRACEMA TR2 TO 058/2001 IPCA RBNI REA 2911/2011 8/10/2013 7/10/2043 738,012.17
  MIRACEMA MC 500 kV RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 785,631.22
  MIRACEMA MG 500 kV MIRACEMA MG1 TO RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBNI REA 2911/2011 8/10/2013 7/10/2040 806,822.63
  MIRACEMA RTL 500 kV 136 Mvar MIRACEMA RT2 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 852,322.87
  MIRACEMA RTL 500 kV 136 MVAr MIRACEMA RT1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 852,322.87
  MIRACEMA RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 852,322.87
  MIRACEMA RTL 500 kV 136 Mvar MIRACEMA RT2 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 946,294.78
  MIRACEMA RTL 500 kV 136 MVAr MIRACEMA RT1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 946,294.78
  MIRACEMA RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 946,294.78
  MIRACEMA IB 500 kV MG 500 kV MIRACEMA MG1 TO IB1 RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 973,306.35
  MIRACEMA EL 500 kV MIRACEMA LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,039,169.68
  MIRACEMA EL 500 kV MIRACEMA LT 500 kV COLINAS /MIRACEMA C-1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,039,169.68
  MIRACEMA MG 500 kV MIRACEMA MG1 TO RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,103,478.12
  MIRACEMA TR 500/138 kV MIRACEMA TF1 TO RBF FT TR 500/138 kV MIRACEMA TF1 TO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,247,254.48
  MIRACEMA IB 500 kV MG 500 kV MIRACEMA MG1 TO IB5 RB FT MG 500 kV MIRACEMA MG1 TO 058/2001 IPCA RBNI REA 2911/2011 8/10/2013 7/10/2044 1,413,367.04
  MIRACEMA MC 500 kV TR 500/138 kV MIRACEMA TR2 TO RBF FT TR 500/138 kV MIRACEMA TR2 TO 058/2001 IPCA RBNI REA 2911/2011 8/10/2013 7/10/2044 1,510,565.71
  MIRACEMA RTL 500 kV 136 Mvar MIRACEMA RT2 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,659,216.79
  MIRACEMA RTL 500 kV 136 MVAr MIRACEMA RT1 TO RB FT LT 500 kV COLINAS /MIRACEMA C-1 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,659,216.79
  MIRACEMA RTB 500 kV 136 MVAr MIRACEMA RT3 TO RB FT RTB 500 kV 136 MVAr MIRACEMA RT3 TO 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,659,216.79
  MIRACEMA TR 500/138 kV MIRACEMA TR2 TO RBF FT TR 500/138 kV MIRACEMA TR2 TO 058/2001 IPCA RBNI REA 2911/2011 8/10/2013 7/10/2047 3,501,543.10
  MIRACEMA CR 500 kV 161 MVAr MIRACEMA BC1 TO RB FT CR 500 kV 161 MVAr MIRACEMA BC1 TO 058/2001 IPCA RBNI REA 6502/2017 14/10/2019 14/10/2039 13,825,169.62
  MIRAMAR MC 69 kV TR 230/69 kV MIRAMAR TR2 PA RBF FT TR 230/69 kV MIRAMAR TR2 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 9/12/2041 73,384.86
  MIRAMAR MC 69 kV TR 230/69 kV MIRAMAR TR1 PA RBF FT TR 230/69 kV MIRAMAR TR1 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 9/12/2041 73,384.86
  MIRAMAR MC 69 kV TR 230/69 kV MIRAMAR TR3 PA RBF FT TR 230/69 kV MIRAMAR TR3 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 9/12/2041 114,713.78
  MIRAMAR IB 230 kV MG 230 kV MIRAMAR MG1 PA IB1 RB FT MG 230 kV MIRAMAR MG1 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 9/12/2041 136,710.64
  MIRAMAR IB 69 kV MG 230 kV MIRAMAR MG1 PA IB1 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 9/12/2041 177,444.40
  MIRAMAR MC 230 kV TR 230/69 kV MIRAMAR TR2 PA RBF FT TR 230/69 kV MIRAMAR TR2 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 9/12/2041 180,432.28
  MIRAMAR MC 230 kV TR 230/69 kV MIRAMAR TR1 PA RBF FT TR 230/69 kV MIRAMAR TR1 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 9/12/2041 180,432.28
  MIRAMAR EL 69 kV MIRAMAR  DIST1 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 9/12/2041 258,394.23
  MIRAMAR MC 230 kV TR 230/69 kV MIRAMAR TR3 PA RBF FT TR 230/69 kV MIRAMAR TR3 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 9/12/2041 282,048.22
  MIRAMAR EL 69 kV MIRAMAR  DIST7 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 9/12/2041 302,276.53
  MIRAMAR EL 69 kV MIRAMAR  DIST6 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 9/12/2041 302,276.53
  MIRAMAR EL 69 kV MIRAMAR  DIST5 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 9/12/2041 302,276.53
  MIRAMAR EL 69 kV MIRAMAR  DIST4 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 9/12/2041 302,276.53
  MIRAMAR EL 69 kV MIRAMAR  DIST3 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 9/12/2041 302,276.53
  MIRAMAR EL 69 kV MIRAMAR  DIST2 DIT   012/2011 IPCA RPEC CC 012/2011 25/04/2016 9/12/2041 302,276.53
  MIRAMAR MG 230 kV MIRAMAR MG1 PA RB FT MG 230 kV MIRAMAR MG1 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 9/12/2041 380,822.52
  MIRAMAR MG 230 kV MIRAMAR MG2 PA RB FT MG 230 kV MIRAMAR MG2 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2047 509,160.24
  MIRAMAR TR 230/69 kV MIRAMAR TR2 PA RBF FT TR 230/69 kV MIRAMAR TR2 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 9/12/2041 514,512.54
  MIRAMAR TR 230/69 kV MIRAMAR TR1 PA RBF FT TR 230/69 kV MIRAMAR TR1 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 9/12/2041 514,512.54
  MIRAMAR TR 230/69 kV MIRAMAR TR3 PA RBF FT TR 230/69 kV MIRAMAR TR3 PA 012/2011 IPCA RBL CC 012/2011 25/04/2016 9/12/2041 804,275.98
  MIRAMAR EL 230 kV MIRAMAR LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2046 1,018,436.27
  MIRAMAR EL 230 kV MIRAMAR LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2046 1,019,631.33
  MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RMEL REN 443/2011 6/4/2017 5/4/2047 241.61
  MIRANDA II TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RMEL REN 443/2011 25/06/2017 24/06/2040 17,578.39

 

148 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MIRANDA II TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RMEL REN 443/2011 29/10/2017 28/10/2040 19,650.76
  MIRANDA II TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RMEL REN 443/2011 19/09/2017 18/09/2047 40,199.25
  MIRANDA II IB 69 kV MG 230 kV MIRANDA II MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,894.81
  MIRANDA II TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RMEL REN 443/2011 19/03/2017 18/03/2031 49,485.81
  MIRANDA II IB 69 kV MG 230 kV MIRANDA II MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 53,175.39
  MIRANDA II EL 13,8 kV MIRANDA II  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  MIRANDA II EL 13,8 kV MIRANDA II  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  MIRANDA II MC 230 kV TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RBNI REA 6219/2017 1/4/2019 1/4/2043 58,772.79
  MIRANDA II EL 13,8 kV MIRANDA II  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,041.57
  MIRANDA II EL 13,8 kV MIRANDA II  DIST5 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,041.57
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 77,675.14
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 77,675.14
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 79,116.64
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 79,116.64
  MIRANDA II EL 69 kV MIRANDA II  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  MIRANDA II EL 69 kV MIRANDA II  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  MIRANDA II EL 69 kV MIRANDA II  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  MIRANDA II EL 69 kV MIRANDA II  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  MIRANDA II EL 69 kV MIRANDA II  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,493.13
  MIRANDA II EL 69 kV MIRANDA II  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,493.13
  MIRANDA II EL 69 kV MIRANDA II  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,493.13
  MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBNI REN 443/2011 27/10/2017 26/10/2048 92,802.33
  MIRANDA II IB 69 kV MG 230 kV MIRANDA II MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 93,236.81
  MIRANDA II IB 138 kV MG 230 kV MIRANDA II MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 98,688.84
  MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR2 MA RBF FT TR 230/138 kV MIRANDA II TR2 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 101,122.89
  MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 101,122.89
  MIRANDA II MG 500 kV MIRANDA II MG1 MA RB FT MG 500 kV MIRANDA II MG1 MA 002/2009 IPCA RBNI REA 6219/2017 10/3/2019 10/3/2051 103,309.12
  MIRANDA II EL 13,8 kV MIRANDA II  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 110,535.98
  MIRANDA II EL 13,8 kV MIRANDA II  DIST5 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 110,535.98
  MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBNI REN 443/2011 29/06/2017 28/06/2045 120,336.39
  MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR3 MA RBF FT TR 230/138 kV MIRANDA II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 127,736.80
  MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR2 MA RBF FT TR 230/138 kV MIRANDA II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 127,736.80
  MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 127,736.80
  MIRANDA II BC 230 kV 20 Mvar MIRANDA II BC2 MA RB FT BC 230 kV 20 Mvar MIRANDA II BC2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 132,141.04
  MIRANDA II BC 230 kV 20 Mvar MIRANDA II BC1 MA RB FT BC 230 kV 20 Mvar MIRANDA II BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 132,141.04
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 138,721.74
  MIRANDA II MC 69 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 138,721.74
  MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 141,820.28
  MIRANDA II MC 230 kV RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 142,539.96
  MIRANDA II MC 230 kV RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 142,539.96
  MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR3 MA RBF FT TR 230/138 kV MIRANDA II TR3 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2046 146,102.76
  MIRANDA II MC 230 kV TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RBNI REA 2533/2010 16/11/2015 16/11/2049 148,236.68
  MIRANDA II IB 230 kV MG 230 kV MIRANDA II MG1 MA IB1 RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  MIRANDA II EL 69 kV MIRANDA II  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 162,175.84
  MIRANDA II EL 69 kV MIRANDA II  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 162,175.84
  MIRANDA II EL 69 kV MIRANDA II  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 162,175.84
  MIRANDA II IB 230 kV MG 230 kV MIRANDA II MG1 MA IB1 RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 167,947.24
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR3 MA RBF FT TR 230/138 kV MIRANDA II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR2 MA RBF FT TR 230/138 kV MIRANDA II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  MIRANDA II MC 230 kV BC 230 kV 20 Mvar MIRANDA II BC2 MA RB FT BC 230 kV 20 Mvar MIRANDA II BC2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 182,242.19
  MIRANDA II MC 230 kV BC 230 kV 20 Mvar MIRANDA II BC1 MA RB FT BC 230 kV 20 Mvar MIRANDA II BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 182,242.19
  MIRANDA II EL 138 kV MIRANDA II  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 190,467.63
  MIRANDA II EL 138 kV MIRANDA II  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 190,467.63
  MIRANDA II EL 138 kV MIRANDA II  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 190,467.63
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 193,954.55
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 193,954.55
  MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR2 MA RBF FT TR 230/138 kV MIRANDA II TR2 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 197,110.06
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 197,152.11
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 197,210.14
  MIRANDA II MC 230 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 197,528.37
  MIRANDA II EL 138 kV MIRANDA II  DIST4 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 211,467.43
  MIRANDA II EL 138 kV MIRANDA II  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 211,467.43
  MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2045 217,448.15
  MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 218,262.96
  MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 218,262.96
  MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 242,327.30
  MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 242,327.30
  MIRANDA II EL 230 kV MIRANDA II LT 230 kV SAO LUIS II /MIRANDA II C-1 MA RB FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  MIRANDA II EL 230 kV MIRANDA II LT 230 kV MIRANDA II /PERITORO C-1 MA RB FT LT 230 kV MIRANDA II /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  MIRANDA II MC 138 kV TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 248,665.22
  MIRANDA II IB 230 kV MG 230 kV MIRANDA II MG1 MA IB1 RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2044 256,887.99
  MIRANDA II MC 230 kV BC 230 kV 20 Mvar MIRANDA II BC1 MA RB FT BC 230 kV 20 Mvar MIRANDA II BC1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2045 281,728.94
  MIRANDA II IB 230 kV MG 230 kV MIRANDA II MG1 MA IB1 RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 294,475.76
  MIRANDA II MC 230 kV RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2044 337,923.71
  MIRANDA II MC 230 kV RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 338,178.15
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 340,076.54
  MIRANDA II MC 230 kV TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 340,076.54
  MIRANDA II EL 230 kV MIRANDA II LT 230 kV MIRANDA II /PERITORO C-1 MA RB FT LT 230 kV MIRANDA II /PERITORO C-1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 347,131.49
  MIRANDA II EL 230 kV MIRANDA II LT 230 kV SAO LUIS II /MIRANDA II C-1 MA RB FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA 058/2001 IPCA RBNI REA 2533/2010 16/11/2015 15/11/2043 347,136.77
  MIRANDA II EL 138 kV MIRANDA II  DIST4 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 370,783.31
  MIRANDA II EL 138 kV MIRANDA II  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 370,783.31

 

149 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MIRANDA II IB 500 kV MG 500 kV MIRANDA II MG1 MA IB3 RB FT MG 500 kV MIRANDA II MG1 MA 002/2009 IPCA RBL CC 002/2009 8/12/2010 28/01/2039 398,751.77
  MIRANDA II IB 500 kV MG 500 kV MIRANDA II MG1 MA IB2 RB FT MG 500 kV MIRANDA II MG1 MA 002/2009 IPCA RBL CC 002/2009 8/12/2010 28/01/2039 398,751.77
  MIRANDA II IB 500 kV MG 500 kV MIRANDA II MG1 MA IB1 RB FT MG 500 kV MIRANDA II MG1 MA 002/2009 IPCA RBL CC 002/2009 8/12/2010 28/01/2039 398,751.77
  MIRANDA II TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  MIRANDA II TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  MIRANDA II TR 230/138 kV MIRANDA II TR3 MA RBF FT TR 230/138 kV MIRANDA II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 421,488.98
  MIRANDA II TR 230/138 kV MIRANDA II TR2 MA RBF FT TR 230/138 kV MIRANDA II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 421,488.98
  MIRANDA II TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 421,488.98
  MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT2 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 424,892.47
  MIRANDA II RTB 230 kV 10 MVAr MIRANDA II RT1 MA RB FT RTB 230 kV 10 MVAr MIRANDA II RT1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 424,892.47
  MIRANDA II MC 230 kV TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RBL CC 002/2009 8/12/2010 28/01/2039 433,694.06
  MIRANDA II TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 445,862.60
  MIRANDA II TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 445,862.60
  MIRANDA II RTB 500 kV 45,33 Mvar MIRANDA II RTR1 MA RB FT RTB 500 kV 45,33 Mvar MIRANDA II RTR1 MA 002/2009 IPCA RBL CC 002/2009 8/12/2010 28/01/2039 449,845.51
  MIRANDA II TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 467,959.77
  MIRANDA II EL 138 kV MIRANDA II  SANTA INES C2 DIT   058/2001 IPCA RCDM REN 443/2011 27/10/2017 26/10/2045 693,264.22
  MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 769,209.62
  MIRANDA II EL 138 kV MIRANDA II  TRES MARIAS DIT   058/2001 IPCA RCDM REN 443/2011 29/06/2017 28/06/2048 771,194.61
  MIRANDA II TR 230/69 kV MIRANDA II TF2 MA RBF FT TR 230/69 kV MIRANDA II TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 781,767.73
  MIRANDA II TR 230/69 kV MIRANDA II TF1 MA RBF FT TR 230/69 kV MIRANDA II TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 781,767.73
  MIRANDA II TR 230/138 kV MIRANDA II TR1 MA RBF FT TR 230/138 kV MIRANDA II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 820,512.52
  MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 854,017.97
  MIRANDA II MC 500 kV RTB 500 kV 136 Mvar MIRANDA II RT1 MA RB FT RTB 500 kV 136 Mvar MIRANDA II RT1 MA 002/2009 IPCA RBL CC 002/2009 8/12/2010 28/01/2039 918,967.32
  MIRANDA II MC 230 kV TR 500/230 kV MIRANDA II TR2 MA RB FT TR 500/230 kV MIRANDA II TR2 MA 002/2009 IPCA RBNI REA 6219/2017 10/3/2019 10/3/2045 946,576.37
  MIRANDA II TR 500/230 kV MIRANDA II TRR1 MA RB FT TR 500/230 kV MIRANDA II TRR1 MA 002/2009 IPCA RBL CC 002/2009 8/12/2010 28/01/2039 947,515.26
  MIRANDA II MC 500 kV TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RBL CC 002/2009 8/12/2010 28/01/2039 1,034,907.98
  MIRANDA II RTB 500 kV 136 Mvar MIRANDA II RT1 MA RB FT RTB 500 kV 136 Mvar MIRANDA II RT1 MA 002/2009 IPCA RBL CC 002/2009 8/12/2010 28/01/2039 1,349,533.32
  MIRANDA II MC 500 kV TR 500/230 kV MIRANDA II TR2 MA RB FT TR 500/230 kV MIRANDA II TR2 MA 002/2009 IPCA RBNI REA 6219/2017 10/3/2019 10/11/2038 1,455,591.60
  MIRANDA II MG 230 kV MIRANDA II MG1 MA RB FT MG 230 kV MIRANDA II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,497,420.24
  MIRANDA II TR 500/230 kV MIRANDA II TR1 MA RB FT TR 500/230 kV MIRANDA II TR1 MA 002/2009 IPCA RBL CC 002/2009 8/12/2010 28/01/2039 2,842,545.79
  MIRANDA II MG 500 kV MIRANDA II MG1 MA RB FT MG 500 kV MIRANDA II MG1 MA 002/2009 IPCA RBL CC 002/2009 8/12/2010 28/01/2039 3,631,992.88
  MIRANDA II TR 500/230 kV MIRANDA II TR2 MA RB FT TR 500/230 kV MIRANDA II TR2 MA 002/2009 IPCA RBNI REA 6219/2017 10/3/2019 10/3/2054 5,576,314.57
  NOBRES EL 230 kV NOBRES LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBNI REA 2376/2010 9/5/2014 8/5/2038 39,453.62
  NOBRES EL 230 kV NOBRES LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBNI REA 2384/2010 20/12/2012 19/12/2038 96,204.74
  NOBRES IB 138 kV MG 230 kV NOBRES MG2 MT IB1 DIT   013/2011 IPCA RPEC CC 013/2011 9/12/2011 9/12/2041 133,662.59
  NOBRES IB 230 kV MG 230 kV NOBRES MG1 MT IB1 RB FT MG 230 kV NOBRES MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  NOBRES MC 138 kV TR 230/138 kV NOBRES TR2 MT RBF FT TR 230/138 kV NOBRES TR2 MT 013/2011 IPCA RBL CC 013/2011 8/10/2013 9/12/2041 167,054.75
  NOBRES MC 138 kV TR 230/138 kV NOBRES TR1 MT RBF FT TR 230/138 kV NOBRES TR1 MT 013/2011 IPCA RBL CC 013/2011 8/10/2013 9/12/2041 167,054.75
  NOBRES MC 230 kV TR 230/138 kV NOBRES TR2 MT RBF FT TR 230/138 kV NOBRES TR2 MT 013/2011 IPCA RBL CC 013/2011 8/10/2013 9/12/2041 217,381.36
  NOBRES MC 230 kV TR 230/138 kV NOBRES TR1 MT RBF FT TR 230/138 kV NOBRES TR1 MT 013/2011 IPCA RBL CC 013/2011 8/10/2013 9/12/2041 217,381.36
  NOBRES EL 230 kV NOBRES LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  NOBRES EL 230 kV NOBRES LT 230 kV COXIPO /NOBRES C-1 MT RB FT LT 230 kV COXIPO /NOBRES C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  NOBRES EL 138 kV NOBRES  DIST1 DIT   013/2011 IPCA RPEC CC 013/2011 9/12/2011 9/12/2041 258,541.61
  NOBRES EL 230 kV NOBRES LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,563.91
  NOBRES MG 230 kV NOBRES MG1 MT RB FT MG 230 kV NOBRES MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 432,317.12
  NOBRES MG 230 kV NOBRES MG2 MT RB FT MG 230 kV NOBRES MG2 MT 013/2011 IPCA RBL CC 013/2011 8/10/2013 9/12/2041 471,357.80
  NOBRES EL 230 kV NOBRES LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 483,168.97
  NOBRES TR 230/138 kV NOBRES TR2 MT RBF FT TR 230/138 kV NOBRES TR2 MT 013/2011 IPCA RBL CC 013/2011 8/10/2013 9/12/2041 534,348.29
  NOBRES TR 230/138 kV NOBRES TR1 MT RBF FT TR 230/138 kV NOBRES TR1 MT 013/2011 IPCA RBL CC 013/2011 8/10/2013 9/12/2041 534,348.29
  NOVA MUTUM EL 13,8 kV NOVA MUTUM  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  NOVA MUTUM MC 69 kV TR 230/69 kV NOVA MUTUM TF2 MT RBF FT TR 230/69 kV NOVA MUTUM TF2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  NOVA MUTUM MC 69 kV TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  NOVA MUTUM MC 230 kV RTL 230 kV 20 MVAr NOVA MUTUM RT1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  NOVA MUTUM TR 230/69 kV NOVA MUTUM TF3 MT RBF FT TR 230/69 kV NOVA MUTUM TF3 MT 058/2001 IPCA RBNI REA 4347/2013 20/01/2017 19/01/2051 132,269.23
  NOVA MUTUM IB 230 kV MG 230 kV NOVA MUTUM MG1 MT IB1 RB FT MG 230 kV NOVA MUTUM MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  NOVA MUTUM MC 230 kV TR 230/69 kV NOVA MUTUM TF2 MT RBF FT TR 230/69 kV NOVA MUTUM TF2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  NOVA MUTUM MC 230 kV TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  NOVA MUTUM TR 230/69 kV NOVA MUTUM TF2 MT RBF FT TR 230/69 kV NOVA MUTUM TF2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 192,095.19
  NOVA MUTUM TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 192,095.19
  NOVA MUTUM MC 230 kV TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 193,954.55
  NOVA MUTUM TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 213,274.44
  NOVA MUTUM EL 230 kV NOVA MUTUM LT 230 kV NOVA MUTUM /SORRISO C-1 MT RB FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  NOVA MUTUM EL 230 kV NOVA MUTUM LT 230 kV NOBRES /NOVA MUTUM C-1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  NOVA MUTUM MG 230 kV NOVA MUTUM MG1 MT RB FT MG 230 kV NOVA MUTUM MG1 MT 058/2001 IPCA RBNI REA 4347/2013 20/01/2017 19/01/2046 254,124.05
  NOVA MUTUM RTL 230 kV 20 MVAr NOVA MUTUM RT1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 328,076.01
  NOVA MUTUM MC 230 kV TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 340,076.54
  NOVA MUTUM MC 69 kV TR 230/69 kV NOVA MUTUM TF3 MT RBF FT TR 230/69 kV NOVA MUTUM TF3 MT 058/2001 IPCA RBNI REA 4347/2013 20/01/2017 19/01/2046 361,436.27
  NOVA MUTUM RTL 230 kV 20 MVAr NOVA MUTUM RT1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 364,247.67
  NOVA MUTUM TR 230/69 kV NOVA MUTUM TF1 MT RBF FT TR 230/69 kV NOVA MUTUM TF1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 373,951.69
  NOVA MUTUM MG 230 kV NOVA MUTUM MG1 MT RB FT MG 230 kV NOVA MUTUM MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 522,327.11
  NOVA MUTUM MG 230 kV NOVA MUTUM MG1 MT RB FT MG 230 kV NOVA MUTUM MG1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 579,915.70
  NOVA MUTUM RTL 230 kV 20 MVAr NOVA MUTUM RT1 MT RB FT LT 230 kV NOBRES /NOVA MUTUM C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 638,665.53
  NOVA MUTUM MC 230 kV TR 230/69 kV NOVA MUTUM TF3 MT RBF FT TR 230/69 kV NOVA MUTUM TF3 MT 058/2001 IPCA RBNI REA 4347/2013 20/01/2017 19/01/2047 981,472.84
  NOVA MUTUM MG 230 kV NOVA MUTUM MG1 MT RB FT MG 230 kV NOVA MUTUM MG1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,016,814.10
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 058/2001 IPCA RBNI REA 5861/2016 3/6/2019 2/6/2034 13,322.72
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBNI REA 5861/2016 3/6/2019 2/6/2034 13,322.72
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 13,322.72
  P.DUTRA EL 230 kV P.DUTRA LT 230 kV P.DUTRA /PERITORO C-1 MA RB FT LT 230 kV P.DUTRA /PERITORO C-1 MA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 13,323.79
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 13,325.97
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 13,327.04
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV MIRANDA II /P.DUTRA C-1 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 13,360.53
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RMEL REA 2837/2011 24/03/2013 23/03/2043 18,191.96
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT11 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 058/2001 IPCA RMEL REN 443/2011 19/11/2017 18/11/2047 19,382.09
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT3 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RMEL REN 443/2011 8/10/2017 7/10/2051 20,554.57
  P.DUTRA TR 230/69 kV P.DUTRA TF1 MA RBF FT TR 230/69 kV P.DUTRA TF1 MA 058/2001 IPCA RMEL REN 443/2011 19/02/2017 18/02/2031 22,142.23
  P.DUTRA RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RMEL REN 443/2011 6/2/2017 5/2/2031 22,319.71

 

150 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RMEL REN 443/2011 13/02/2017 12/2/2031 22,340.20
  P.DUTRA RTL 500 kV 50 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 50 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RMEL REN 443/2011 27/01/2017 26/01/2031 22,363.99
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT7 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RMEL REN 443/2011 10/4/2017 9/4/2031 22,416.60
  P.DUTRA TR 230/13,8 kV P.DUTRA TF3 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RMEL REN 443/2011 15/02/2017 14/02/2031 23,824.55
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT8 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RMEL REN 443/2011 26/11/2017 25/11/2040 27,310.53
  P.DUTRA TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RMEL REN 443/2011 14/05/2017 13/05/2031 28,499.14
  P.DUTRA IB 69 kV MG 500 kV P.DUTRA MG1 MA IB1 DIT   058/2001 IPCA RCDM REA 8348/2019 28/12/2021 28/12/2036 41,944.97
  P.DUTRA MG 500 kV P.DUTRA MG1 MA RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBNI REA 8348/2019 28/12/2021 28/12/2052 44,060.62
  P.DUTRA IB 69 kV MG 500 kV P.DUTRA MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,894.81
  P.DUTRA IB 69 kV MG 500 kV P.DUTRA MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 53,175.39
  P.DUTRA MG 500 kV P.DUTRA MG1 MA RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBNI REN 443/2011 29/06/2017 28/06/2045 53,763.89
  P.DUTRA MG 500 kV P.DUTRA MG1 MA RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBNI REN 443/2011 29/06/2017 28/06/2045 53,763.89
  P.DUTRA EL 13,8 kV P.DUTRA  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  P.DUTRA MC 13,8 kV CS 100/-70 MVAr P.DUTRA CS2 MA RB FT CS 100/-70 MVAr P.DUTRA CS2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,646.29
  P.DUTRA MC 13,8 kV CS 100/-70 MVAr P.DUTRA CS1 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,646.29
  P.DUTRA MC 69 kV TR 230/69 kV P.DUTRA TF4 MA RBF FT TR 230/69 kV P.DUTRA TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  P.DUTRA MC 69 kV TR 230/69 kV P.DUTRA TF1 MA RBF FT TR 230/69 kV P.DUTRA TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  P.DUTRA EL 69 kV P.DUTRA  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  P.DUTRA EL 69 kV P.DUTRA  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  P.DUTRA IB 230 kV MG 500 kV P.DUTRA MG1 MA IB1 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBNI REA 8348/2019 28/12/2021 28/12/2036 124,162.83
  P.DUTRA IB 230 kV MG 500 kV P.DUTRA MG1 MA IB1 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  P.DUTRA MG 500 kV P.DUTRA MG1 MA RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBNI REA 8348/2019 28/12/2021 28/12/2052 157,266.71
  P.DUTRA MC 230 kV TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  P.DUTRA MC 230 kV TR 230/69 kV P.DUTRA TF4 MA RBF FT TR 230/69 kV P.DUTRA TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  P.DUTRA MC 230 kV TR 230/69 kV P.DUTRA TF1 MA RBF FT TR 230/69 kV P.DUTRA TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  P.DUTRA MC 230 kV TR 230/13,8 kV P.DUTRA TF3 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  P.DUTRA TT 69/0 kV P.DUTRA TT1 MA DIT   058/2001 IPCA RCDM REN 443/2011 30/11/2019 29/11/2049 211,968.39
  P.DUTRA TR 230/13,8 kV P.DUTRA TRR3 MA RB FT TR 230/13,8 kV P.DUTRA TRR3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 239,999.40
  P.DUTRA RTL 500 kV 33,3 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 33,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 255,407.76
  P.DUTRA EL 230 kV P.DUTRA LT 230 kV P.DUTRA /PERITORO C-1 MA RB FT LT 230 kV P.DUTRA /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  P.DUTRA TR 230/69 kV P.DUTRA TF4 MA RBF FT TR 230/69 kV P.DUTRA TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 280,978.73
  P.DUTRA TR 230/69 kV P.DUTRA TF1 MA RBF FT TR 230/69 kV P.DUTRA TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 280,978.73
  P.DUTRA RTL 500 kV 33,3 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 33,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 283,567.46
  P.DUTRA RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,039.19
  P.DUTRA MC 500 kV RTL 500 kV 150 MVAr P.DUTRA RT8 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  P.DUTRA MC 500 kV RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  P.DUTRA MC 500 kV RTL 500 kV 150 MVAr P.DUTRA RT11 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  P.DUTRA MC 500 kV RTL 500 kV 136 MVAr P.DUTRA RT7 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  P.DUTRA MC 500 kV RTL 500 kV 136 MVAr P.DUTRA RT3 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  P.DUTRA MC 500 kV RTL 500 kV 136 MVAr P.DUTRA RT2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  P.DUTRA MC 500 kV RTL 500 kV 100 MVAr P.DUTRA RT6 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  P.DUTRA MC 500 kV RTL 500 kV 100 MVAr P.DUTRA RT5 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  P.DUTRA RTL 500 kV 50 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 50 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 293,223.21
  P.DUTRA RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA RB FT RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 301,069.87
  P.DUTRA RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 315,355.61
  P.DUTRA RTL 500 kV 50 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 50 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 325,552.21
  P.DUTRA MC 69 kV TR 230/69 kV P.DUTRA TF5 MA RBF FT TR 230/69 kV P.DUTRA TF5 MA 058/2001 IPCA RBNI REA 2533/2010 3/9/2012 2/9/2044 325,724.70
  P.DUTRA RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA RB FT RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 334,263.99
  P.DUTRA MC 69 kV TR 230/69 kV P.DUTRA TF6 MA RBF FT TR 230/69 kV P.DUTRA TF6 MA 058/2001 IPCA RBNI REA 8348/2019 28/12/2021 28/12/2048 338,722.37
  P.DUTRA EL 69 kV P.DUTRA  CEMAR DIT   058/2001 IPCA RCDM REN 443/2011 29/06/2017 28/06/2046 396,439.41
  P.DUTRA EL 69 kV P.DUTRA  BARRA CORDA DIT   058/2001 IPCA RCDM REN 443/2011 29/06/2017 28/06/2046 396,439.41
  P.DUTRA MC 500 kV RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 441,123.86
  P.DUTRA MC 500 kV RTB 500 kV 150 MVAr P.DUTRA RT1 MA RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 441,123.86
  P.DUTRA MC 500 kV TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 471,137.52
  P.DUTRA MC 500 kV RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 489,759.48
  P.DUTRA MC 500 kV RTB 500 kV 150 MVAr P.DUTRA RT1 MA RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 489,759.48
  P.DUTRA RTL 500 kV 33,3 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 33,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 497,202.26
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB4 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB3 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB2 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB1 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV MIRANDA II /P.DUTRA C-1 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  P.DUTRA TR 500/230 kV P.DUTRA TRR1 MA RB FT TR 500/230 kV P.DUTRA TRR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 551,295.46
  P.DUTRA RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 45,3 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 552,939.04
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB4 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB3 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB2 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  P.DUTRA IB 500 kV MG 500 kV P.DUTRA MG1 MA IB1 RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  P.DUTRA RTL 500 kV 50 Mvar P.DUTRA RTR1 MA RB FT RTL 500 kV 50 Mvar P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 570,817.58
  P.DUTRA RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA RB FT RTB 500 kV 54,4 MVAr P.DUTRA RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 586,092.67
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV MIRANDA II /P.DUTRA C-2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  P.DUTRA TR 500/230 kV P.DUTRA TRR1 MA RB FT TR 500/230 kV P.DUTRA TRR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 612,077.92
  P.DUTRA TR 230/13,8 kV P.DUTRA TF3 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 719,987.29
  P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT6 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 766,502.54
  P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT5 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 766,502.54
  P.DUTRA TR 230/13,8 kV P.DUTRA TF3 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 799,368.68
  P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT6 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 851,012.42
  P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT5 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 851,012.42

 

151 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT7 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 852,322.87
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT3 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 852,322.87
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 852,322.87
  P.DUTRA MC 500 kV RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 858,735.75
  P.DUTRA MC 500 kV RTB 500 kV 150 MVAr P.DUTRA RT1 MA RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 858,735.75
  P.DUTRA MC 230 kV TR 230/69 kV P.DUTRA TF5 MA RBF FT TR 230/69 kV P.DUTRA TF5 MA 058/2001 IPCA RBNI REA 2533/2010 3/9/2012 2/9/2041 867,040.97
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT8 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 879,669.63
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 879,669.63
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT11 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-2 PI/MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 879,669.63
  P.DUTRA RTB 500 kV 150 MVAr P.DUTRA RT1 MA RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 879,669.63
  P.DUTRA MC 230 kV TR 230/69 kV P.DUTRA TF6 MA RBF FT TR 230/69 kV P.DUTRA TF6 MA 058/2001 IPCA RBNI REA 8348/2019 28/12/2021 28/12/2049 895,092.38
  P.DUTRA RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 902,867.36
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT7 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 946,294.78
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT3 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 946,294.78
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 946,294.78
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT8 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 976,656.62
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 976,656.62
  P.DUTRA RTB 500 kV 150 MVAr P.DUTRA RT1 MA RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 976,656.62
  P.DUTRA TR 230/69 kV P.DUTRA TF5 MA RBF FT TR 230/69 kV P.DUTRA TF5 MA 058/2001 IPCA RBNI REA 2533/2010 3/9/2012 2/9/2046 992,508.64
  P.DUTRA RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,002,412.00
  P.DUTRA EL 500 kV P.DUTRA LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,039,169.68
  P.DUTRA TR 500/230 kV P.DUTRA TRR1 MA RB FT TR 500/230 kV P.DUTRA TRR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,073,206.78
  P.DUTRA TR 230/69 kV P.DUTRA TF6 MA RBF FT TR 230/69 kV P.DUTRA TF6 MA 058/2001 IPCA RBNI REA 8348/2019 28/12/2021 28/12/2055 1,279,966.66
  P.DUTRA CR 500 kV 390 MVAr P.DUTRA BC1 MA RB FT CR 500 kV 390 MVAr P.DUTRA BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,388,385.80
  P.DUTRA TR 230/13,8 kV P.DUTRA TF3 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,401,599.14
  P.DUTRA CS 100/-70 MVAr P.DUTRA CS2 MA RB FT CS 100/-70 MVAr P.DUTRA CS2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,476,161.10
  P.DUTRA CS 100/-70 MVAr P.DUTRA CS1 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,476,161.10
  P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT6 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,492,150.37
  P.DUTRA RTL 500 kV 100 MVAr P.DUTRA RT5 MA RB FT LT 500 kV P.DUTRA /B. ESPERANCA C-1 MA/PI 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,492,150.37
  P.DUTRA CR 500 kV 390 MVAr P.DUTRA BC1 MA RB FT CR 500 kV 390 MVAr P.DUTRA BC1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,541,460.73
  P.DUTRA CR 500 kV 454 MVAr P.DUTRA BC2 MA RB FT CR 500 kV 454 MVAr P.DUTRA BC2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,568,019.40
  P.DUTRA CS 100/-70 MVAr P.DUTRA CS2 MA RB FT CS 100/-70 MVAr P.DUTRA CS2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,638,913.60
  P.DUTRA CS 100/-70 MVAr P.DUTRA CS1 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,638,913.60
  P.DUTRA TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,653,886.37
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT7 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,659,216.79
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT3 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,659,216.79
  P.DUTRA RTL 500 kV 136 MVAr P.DUTRA RT2 MA RB FT LT 500 kV MIRANDA II /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,659,216.79
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT8 MA RB FT LT 500 kV TERESINA II /P.DUTRA C-1 PI/MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,712,452.73
  P.DUTRA RTL 500 kV 150 MVAr P.DUTRA RT4 MA RB FT LT 500 kV IMPERATRIZ /P.DUTRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,712,452.73
  P.DUTRA RTB 500 kV 150 MVAr P.DUTRA RT1 MA RB FT RTB 500 kV 150 MVAr P.DUTRA RT1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,712,452.73
  P.DUTRA CR 500 kV 454 MVAr P.DUTRA BC2 MA RB FT CR 500 kV 454 MVAr P.DUTRA BC2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,740,899.63
  P.DUTRA RTB 500 kV 163 MVAr P.DUTRA RT9 MA RB FT RTB 500 kV 163 MVAr P.DUTRA RT9 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,757,611.75
  P.DUTRA TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,836,233.77
  P.DUTRA MG 500 kV P.DUTRA MG1 MA RB FT MG 500 kV P.DUTRA MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,419,449.31
  P.DUTRA CR 500 kV 390 MVAr P.DUTRA BC1 MA RB FT CR 500 kV 390 MVAr P.DUTRA BC1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,702,770.42
  P.DUTRA CS 100/-70 MVAr P.DUTRA CS2 MA RB FT CS 100/-70 MVAr P.DUTRA CS2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,873,642.57
  P.DUTRA CS 100/-70 MVAr P.DUTRA CS1 MA RB FT CS 100/-70 MVAr P.DUTRA CS1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,873,642.57
  P.DUTRA CR 500 kV 454 MVAr P.DUTRA BC2 MA RB FT CR 500 kV 454 MVAr P.DUTRA BC2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,052,463.11
  P.DUTRA TR 500/230 kV P.DUTRA TR1 MA RB FT TR 500/230 kV P.DUTRA TR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,219,620.34
  PERITORO MG 230 kV PERITORO MG1 MA RB FT MG 230 kV PERITORO MG1 MA 058/2001 IPCA RBNI REN 443/2011 8/8/2019 7/8/2050 35,245.09
  PERITORO IB 69 kV MG 230 kV PERITORO MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,894.81
  PERITORO EL 13,8 kV PERITORO  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  PERITORO EL 13,8 kV PERITORO  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  PERITORO MC 69 kV TR 230/69 kV PERITORO TF2 MA RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  PERITORO MC 69 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  PERITORO MC 69 kV TR 230/69 kV PERITORO TF2 MA RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 79,116.64
  PERITORO MC 69 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 79,116.64
  PERITORO EL 69 kV PERITORO  DIST9 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  PERITORO EL 69 kV PERITORO  DIST8 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  PERITORO EL 69 kV PERITORO  DIST7 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  PERITORO EL 69 kV PERITORO  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  PERITORO EL 69 kV PERITORO  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  PERITORO EL 69 kV PERITORO  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  PERITORO EL 69 kV PERITORO  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  PERITORO EL 69 kV PERITORO  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  PERITORO EL 69 kV PERITORO  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  PERITORO EL 69 kV PERITORO  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,493.13
  PERITORO EL 69 kV PERITORO  DIST5 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,493.13
  PERITORO BC 230 kV 20 Mvar PERITORO BC1 MA RB FT BC 230 kV 20 Mvar PERITORO BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 132,141.04
  PERITORO TT 69/0 kV PERITORO TT1 MA DIT   058/2001 IPCA RCDM REN 443/2011 9/5/2014 8/5/2044 133,273.26
  PERITORO MC 69 kV TR 230/69 kV PERITORO TF2 MA RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 138,721.74
  PERITORO MC 69 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 138,721.74
  PERITORO IB 230 kV MG 230 kV PERITORO MG1 MA IB1 RB FT MG 230 kV PERITORO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  PERITORO EL 69 kV PERITORO  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 162,175.84
  PERITORO EL 69 kV PERITORO  DIST5 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 162,175.84
  PERITORO MC 230 kV TR 230/69 kV PERITORO TF2 MA RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  PERITORO MC 230 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  PERITORO MG 230 kV PERITORO MG1 MA RB FT MG 230 kV PERITORO MG1 MA 058/2001 IPCA RBNI REA 2533/2010 3/9/2012 2/9/2039 198,403.05
  PERITORO MC 230 kV TR 230/69 kV PERITORO TF2 MA RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 204,396.72
  PERITORO MC 230 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 204,396.72
  PERITORO MC 230 kV BC 230 kV 20 Mvar PERITORO BC1 MA RB FT BC 230 kV 20 Mvar PERITORO BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 205,385.16
  PERITORO EL 230 kV PERITORO LT 230 kV PERITORO /COELHO NETO C-1 MA RB FT LT 230 kV PERITORO /COELHO NETO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  PERITORO EL 230 kV PERITORO LT 230 kV P.DUTRA /PERITORO C-1 MA RB FT LT 230 kV P.DUTRA /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  PERITORO EL 230 kV PERITORO LT 230 kV MIRANDA II /PERITORO C-1 MA RB FT LT 230 kV MIRANDA II /PERITORO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  PERITORO MC 69 kV TR 230/69 kV PERITORO TR3 MA RBF FT TR 230/69 kV PERITORO TR3 MA 058/2001 IPCA RBNI REA 2533/2010 3/9/2012 2/9/2042 326,165.44
  PERITORO MC 230 kV TR 230/69 kV PERITORO TF2 MA RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 358,385.66

 

152 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  PERITORO MC 230 kV TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 358,385.66
  PERITORO EL 69 kV PERITORO  DIST10 DIT   058/2001 IPCA RCDM REN 443/2011 8/8/2019 7/8/2047 392,863.85
  PERITORO TR 230/69 kV PERITORO TF2 MA RBF FT TR 230/69 kV PERITORO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  PERITORO TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  PERITORO TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 445,862.60
  PERITORO MG 230 kV PERITORO MG1 MA RB FT MG 230 kV PERITORO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 622,601.25
  PERITORO TR 230/69 kV PERITORO TF1 MA RBF FT TR 230/69 kV PERITORO TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 781,767.73
  PERITORO MC 230 kV TR 230/69 kV PERITORO TR3 MA RBF FT TR 230/69 kV PERITORO TR3 MA 058/2001 IPCA RBNI REA 2533/2010 3/9/2012 2/9/2042 859,010.06
  PERITORO TR 230/69 kV PERITORO TR3 MA RBF FT TR 230/69 kV PERITORO TR3 MA 058/2001 IPCA RBNI REA 2533/2010 3/9/2012 2/9/2046 1,310,709.38
  PIMENTA BUENO MC 230 kV RTN 230 kV 0,1 Mvar PIMENTA BUENO RN1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,653.70
  PIMENTA BUENO RTN 230 kV 0,1 Mvar PIMENTA BUENO RN1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  PIMENTA BUENO MC 138 kV TR 230/138 kV PIMENTA BUENO TR2 RO RBF FT TR 230/138 kV PIMENTA BUENO TR2 RO 058/2001 IPCA RBNI REA 3470/2012 8/4/2015 7/4/2045 42,483.76
  PIMENTA BUENO MC 138 kV TR 230/138 kV PIMENTA BUENO TR1 RO RBF FT TR 230/138 kV PIMENTA BUENO TR1 RO 058/2001 IPCA RBNI REA 3470/2012 8/4/2015 7/4/2045 42,483.76
  PIMENTA BUENO MC 138 kV TR 230/138 kV PIMENTA BUENO TR2 RO RBF FT TR 230/138 kV PIMENTA BUENO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,982.73
  PIMENTA BUENO MC 138 kV TR 230/138 kV PIMENTA BUENO TR1 RO RBF FT TR 230/138 kV PIMENTA BUENO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,982.73
  PIMENTA BUENO IB 230 kV MG 230 kV PIMENTA BUENO MG1 RO IB1 RB FT MG 230 kV PIMENTA BUENO MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  PIMENTA BUENO MC 230 kV RTB 230 kV 20 Mvar PIMENTA BUENO RT2 RO RB FT RTB 230 kV 20 Mvar PIMENTA BUENO RT2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,992.04
  PIMENTA BUENO MC 230 kV TR 230/138 kV PIMENTA BUENO TR2 RO RBF FT TR 230/138 kV PIMENTA BUENO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  PIMENTA BUENO MC 230 kV TR 230/138 kV PIMENTA BUENO TR1 RO RBF FT TR 230/138 kV PIMENTA BUENO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  PIMENTA BUENO MC 230 kV BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO MC2 RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2042 212,864.12
  PIMENTA BUENO MC 230 kV RTL 230 kV 0 Mvar PIMENTA BUENO RT4 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 220,163.20
  PIMENTA BUENO RTL 230 kV 20 Mvar PIMENTA BUENO RT1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 245,934.80
  PIMENTA BUENO RTB 230 kV 20 Mvar PIMENTA BUENO RT2 RO RB FT RTB 230 kV 20 Mvar PIMENTA BUENO RT2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 245,934.80
  PIMENTA BUENO EL 230 kV PIMENTA BUENO LT 230 kV PIMENTA BUENO /VILHENA C-1 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  PIMENTA BUENO EL 230 kV PIMENTA BUENO LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  PIMENTA BUENO BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2032 283,505.05
  PIMENTA BUENO BC 230 kV 18 Mvar PIMENTA BUENO BC3 RO RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC3 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2032 283,865.22
  PIMENTA BUENO BC 230 kV 18 Mvar PIMENTA BUENO BC2 RO RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC2 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2032 283,865.22
  PIMENTA BUENO TR 230/138 kV PIMENTA BUENO TR2 RO RBF FT TR 230/138 kV PIMENTA BUENO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 311,990.56
  PIMENTA BUENO TR 230/138 kV PIMENTA BUENO TR1 RO RBF FT TR 230/138 kV PIMENTA BUENO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 311,990.56
  PIMENTA BUENO MG 230 kV PIMENTA BUENO MG1 RO RB FT MG 230 kV PIMENTA BUENO MG1 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2040 528,303.42
  PIMENTA BUENO MG 230 kV PIMENTA BUENO MG1 RO RB FT MG 230 kV PIMENTA BUENO MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 586,722.53
  PIMENTA BUENO RTL 230 kV 0 Mvar PIMENTA BUENO RT4 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 663,495.71
  PIMENTA BUENO EL 230 kV PIMENTA BUENO LT 230 kV PIMENTA BUENO /VILHENA C-3 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 671,879.23
  PIMENTA BUENO EL 230 kV PIMENTA BUENO LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO RB FT LT 230 kV JI-PARANA /PIMENTA BUENO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 671,879.23
  PIMENTA BUENO MC 230 kV BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO MC1 RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC1 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2043 755,938.28
  PIMENTA BUENO MC 230 kV BC 230 kV 18 Mvar PIMENTA BUENO BC3 RO RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC3 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2043 755,949.92
  PIMENTA BUENO MC 230 kV BC 230 kV 18 Mvar PIMENTA BUENO BC2 RO RB FT BC 230 kV 18 Mvar PIMENTA BUENO BC2 RO 058/2001 IPCA RBNI REA 2533/2010 20/12/2012 19/12/2043 755,949.92
  PORTO FRANCO MC 13,8 kV TR 230/138 kV PORTO FRANCO TR3 MA RBF FT TR 230/138 kV PORTO FRANCO TR3 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2044 30,217.86
  PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REN 443/2011 16/08/2017 15/08/2048 41,218.93
  PORTO FRANCO IB 69 kV MG 230 kV PORTO FRANCO MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,894.81
  PORTO FRANCO IB 69 kV MG 230 kV PORTO FRANCO MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 53,175.39
  PORTO FRANCO MC 69 kV TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  PORTO FRANCO MC 69 kV TR 230/69 kV PORTO FRANCO TF1 MA RBF FT TR 230/69 kV PORTO FRANCO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  PORTO FRANCO MC 69 kV TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 79,116.64
  PORTO FRANCO EL 69 kV PORTO FRANCO  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  PORTO FRANCO EL 69 kV PORTO FRANCO  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  PORTO FRANCO EL 69 kV PORTO FRANCO  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,493.13
  PORTO FRANCO EL 69 kV PORTO FRANCO  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,493.13
  PORTO FRANCO IB 69 kV MG 230 kV PORTO FRANCO MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 93,236.81
  PORTO FRANCO IB 138 kV MG 230 kV PORTO FRANCO MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 98,688.84
  PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2041 115,134.52
  PORTO FRANCO MC 138 kV TR 230/138 kV PORTO FRANCO TR2 MA RBF FT TR 230/138 kV PORTO FRANCO TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 127,736.80
  PORTO FRANCO MC 138 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 127,736.80
  PORTO FRANCO MC 138 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 141,820.28
  PORTO FRANCO TT 69/0 kV PORTO FRANCO TA3 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2046 145,161.34
  PORTO FRANCO IB 230 kV MG 230 kV PORTO FRANCO MG1 MA IB1 RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  PORTO FRANCO EL 69 kV PORTO FRANCO  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 162,175.84
  PORTO FRANCO EL 69 kV PORTO FRANCO  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 162,175.84
  PORTO FRANCO IB 230 kV MG 230 kV PORTO FRANCO MG1 MA IB1 RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 167,947.24
  PORTO FRANCO MC 230 kV TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  PORTO FRANCO MC 230 kV TR 230/69 kV PORTO FRANCO TF1 MA RBF FT TR 230/69 kV PORTO FRANCO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  PORTO FRANCO MC 230 kV TR 230/138 kV PORTO FRANCO TR2 MA RBF FT TR 230/138 kV PORTO FRANCO TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  PORTO FRANCO MC 230 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2042 182,270.89
  PORTO FRANCO EL 138 kV PORTO FRANCO  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 190,467.63
  PORTO FRANCO EL 138 kV PORTO FRANCO  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 190,467.63
  PORTO FRANCO MC 230 kV TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 193,954.55
  PORTO FRANCO MC 230 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 193,954.55
  PORTO FRANCO TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 208,679.14
  PORTO FRANCO TR 230/69 kV PORTO FRANCO TF1 MA RBF FT TR 230/69 kV PORTO FRANCO TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 208,679.14
  PORTO FRANCO EL 138 kV PORTO FRANCO  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 211,467.43
  PORTO FRANCO EL 138 kV PORTO FRANCO  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 211,467.43
  PORTO FRANCO TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 231,686.83
  PORTO FRANCO MC 69 kV TT 69/0 kV PORTO FRANCO TA3 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2047 246,090.47
  PORTO FRANCO EL 230 kV PORTO FRANCO LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  PORTO FRANCO MC 138 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 248,665.22
  PORTO FRANCO EL 230 kV PORTO FRANCO LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,563.91
  PORTO FRANCO IB 230 kV MG 230 kV PORTO FRANCO MG1 MA IB1 RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 294,475.76
  PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2044 324,323.56
  PORTO FRANCO MC 230 kV TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 340,076.54
  PORTO FRANCO MC 230 kV TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 340,076.54
  PORTO FRANCO EL 69 kV PORTO FRANCO  SE SITIO NOVO DIT   058/2001 IPCA RCDM REN 443/2011 16/08/2017 15/08/2045 346,426.34
  PORTO FRANCO EL 138 kV PORTO FRANCO  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 370,783.31
  PORTO FRANCO EL 138 kV PORTO FRANCO  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 370,783.31
  PORTO FRANCO TR 230/69 kV PORTO FRANCO TF2 MA RBF FT TR 230/69 kV PORTO FRANCO TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 406,235.65

 

153 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  PORTO FRANCO TR 230/138 kV PORTO FRANCO TR2 MA RBF FT TR 230/138 kV PORTO FRANCO TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 421,488.98
  PORTO FRANCO TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 421,488.98
  PORTO FRANCO TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 467,959.77
  PORTO FRANCO EL 230 kV PORTO FRANCO LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA RB FT LT 230 kV IMPERATRIZ /PORTO FRANCO C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 483,168.97
  PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 634,770.71
  PORTO FRANCO MC 69 kV TR 230/69 kV PORTO FRANCO TF3 MA RBF FT TR 230/69 kV PORTO FRANCO TF3 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2046 652,447.56
  PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 704,756.64
  PORTO FRANCO MC 138 kV TR 230/138 kV PORTO FRANCO TR3 MA RBF FT TR 230/138 kV PORTO FRANCO TR3 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2046 732,058.77
  PORTO FRANCO TR 230/138 kV PORTO FRANCO TR1 MA RBF FT TR 230/138 kV PORTO FRANCO TR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 820,512.52
  PORTO FRANCO MC 230 kV TR 230/138 kV PORTO FRANCO TR3 MA RBF FT TR 230/138 kV PORTO FRANCO TR3 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2045 888,727.46
  PORTO FRANCO TR 230/69 kV PORTO FRANCO TF3 MA RBF FT TR 230/69 kV PORTO FRANCO TF3 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2050 919,204.16
  PORTO FRANCO MG 230 kV PORTO FRANCO MG1 MA RB FT MG 230 kV PORTO FRANCO MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,235,708.03
  PORTO FRANCO TR 230/138 kV PORTO FRANCO TR3 MA RBF FT TR 230/138 kV PORTO FRANCO TR3 MA 058/2001 IPCA RBNI REA 3361/2012 16/07/2015 15/07/2049 1,312,551.99
  PORTO FRANCO MC 230 kV TR 230/69 kV PORTO FRANCO TF3 MA RBF FT TR 230/69 kV PORTO FRANCO TF3 MA 058/2001 IPCA RBNI REA 4492/2014 21/06/2016 20/06/2046 1,409,999.68
  PORTO VELHO IB 230 kV MG 230 kV PORTO VELHO MG1 RO IB1 RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RBNI REA 2533/2010 25/06/2012 24/06/2042 9,268.44
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO 010/2009 IPCA RBNI REA 5861/2016 17/06/2019 16/06/2034 14,233.36
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO 010/2009 IPCA RBNI REA 5861/2016 7/6/2019 6/6/2034 14,233.36
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV ABUNA /PORTO VELHO C-2 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBNI REA 5861/2016 7/6/2019 6/6/2034 14,233.36
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 14,239.13
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBNI REA 5861/2016 7/6/2019 6/6/2034 14,239.13
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV ABUNA /PORTO VELHO C-1 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBNI REA 5861/2016 17/06/2019 16/06/2034 14,239.13
  PORTO VELHO MC 69 kV TR 230/69 kV PORTO VELHO TR3 RO RBF FT TR 230/69 kV PORTO VELHO TR3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,796.04
  PORTO VELHO MC 69 kV TR 230/69 kV PORTO VELHO TR2 RO RBF FT TR 230/69 kV PORTO VELHO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,796.04
  PORTO VELHO MC 69 kV TR 230/69 kV PORTO VELHO TR1 RO RBF FT TR 230/69 kV PORTO VELHO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 75,796.04
  PORTO VELHO IB 230 kV MG 230 kV PORTO VELHO MG1 RO IB1 RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBNI REA 5833/2016 20/10/2017 19/10/2047 167,816.92
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBNI REA 5833/2016 20/10/2017 19/10/2047 167,816.92
  PORTO VELHO MC 230 kV TR 230/69 kV PORTO VELHO TR3 RO RBF FT TR 230/69 kV PORTO VELHO TR3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  PORTO VELHO MC 230 kV TR 230/69 kV PORTO VELHO TR2 RO RBF FT TR 230/69 kV PORTO VELHO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  PORTO VELHO MC 230 kV TR 230/69 kV PORTO VELHO TR1 RO RBF FT TR 230/69 kV PORTO VELHO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  PORTO VELHO MG 230 kV PORTO VELHO MG1 RO RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RBNI REA 2533/2010 25/06/2012 24/06/2038 222,930.13
  PORTO VELHO MG 230 kV PORTO VELHO MG1 RO RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RMEL REN 443/2011 1/9/2016 31/08/2033 223,698.31
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV ABUNA /PORTO VELHO C-1 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  PORTO VELHO TR 230/69 kV PORTO VELHO TR1 RO RBF FT TR 230/69 kV PORTO VELHO TR1 RO 058/2001 IPCA RBNI REA 5861/2016 19/06/2019 18/06/2054 254,036.71
  PORTO VELHO MC 69 kV TR 230/69 kV PORTO VELHO TR4 RO RBF FT TR 230/69 kV PORTO VELHO TR4 RO 058/2001 IPCA RBNI REA 2533/2010 25/06/2012 24/06/2043 337,527.95
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-2 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 371,509.90
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO RB FT LT 230 kV COLETORA PORTO VELHO /PORTO VELHO C-1 RO 010/2009 IPCA RBL CC 010/2009 15/11/2011 26/02/2039 371,509.90
  PORTO VELHO TR 230/69 kV PORTO VELHO TR3 RO RBF FT TR 230/69 kV PORTO VELHO TR3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  PORTO VELHO TR 230/69 kV PORTO VELHO TR2 RO RBF FT TR 230/69 kV PORTO VELHO TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  PORTO VELHO TR 230/69 kV PORTO VELHO TR1 RO RBF FT TR 230/69 kV PORTO VELHO TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  PORTO VELHO MG 230 kV PORTO VELHO MG1 RO RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 564,376.98
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV SAMUEL /PORTO VELHO C-3 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 671,879.23
  PORTO VELHO EL 230 kV PORTO VELHO LT 230 kV ABUNA /PORTO VELHO C-2 RO RB FT LT 230 kV ABUNA /PORTO VELHO C-2 RO 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 688,118.00
  PORTO VELHO MC 230 kV TR 230/69 kV PORTO VELHO TR4 RO RBF FT TR 230/69 kV PORTO VELHO TR4 RO 058/2001 IPCA RBNI REA 2533/2010 25/06/2012 24/06/2042 855,782.72
  PORTO VELHO TR 230/69 kV PORTO VELHO TR4 RO RBF FT TR 230/69 kV PORTO VELHO TR4 RO 058/2001 IPCA RBNI REA 2533/2010 25/06/2012 24/06/2046 1,357,882.52
  PORTO VELHO MG 230 kV PORTO VELHO MG1 RO RB FT MG 230 kV PORTO VELHO MG1 RO 058/2001 IPCA RBNI REA 5861/2016 19/03/2021 18/03/2036 1,495,450.69
  RIB.GONCALVES IB 69 kV MG 500 kV RIB.GONCALVES MG3 PI IB1 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 22,891.67
  RIB.GONCALVES MC 69 kV TT 69/0 kV RIB.GONCALVES TT1 PI DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 27,713.71
  RIB.GONCALVES MC 69 kV TR 230/69 kV RIB.GONCALVES TR1 PI RBF FT TR 230/69 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 47,422.00
  RIB.GONCALVES EL 69 kV RIB.GONCALVES  DIST1 DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 48,120.25
  RIB.GONCALVES MG 500 kV RIB.GONCALVES MG3 PI RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBNI DSP 4029/2021 18/04/2022 17/04/2037 49,532.94
  RIB.GONCALVES MC 230 kV TR 500/230 kV RIB.GONCALVES TR1 PI RB FT TR 500/230 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBNI REA 4745/2014 30/08/2016 30/08/2046 59,728.27
  RIB.GONCALVES TT 69/0 kV RIB.GONCALVES TT1 PI DIT   001/2009 IPCA RPEC CC 001/2009 28/01/2009 28/01/2039 110,852.90
  RIB.GONCALVES IB 230 kV MG 500 kV RIB.GONCALVES MG3 PI IB1 RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 143,475.82
  RIB.GONCALVES MG 500 kV RIB.GONCALVES MG3 PI RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2047 149,279.25
  RIB.GONCALVES MG 500 kV RIB.GONCALVES MG3 PI RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBNI REA 8542/2020 22/12/2021 22/12/2052 176,682.48
  RIB.GONCALVES IB 500 kV MG 500 kV RIB.GONCALVES MG3 PI IB1 RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 238,569.86
  RIB.GONCALVES TR 230/69 kV RIB.GONCALVES TR1 PI RBF FT TR 230/69 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 256,348.06
  RIB.GONCALVES MC 230 kV TR 500/230 kV RIB.GONCALVES TR1 PI RB FT TR 500/230 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 259,475.55
  RIB.GONCALVES MC 230 kV TR 230/69 kV RIB.GONCALVES TR1 PI RBF FT TR 230/69 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 259,475.55
  RIB.GONCALVES EL 230 kV RIB.GONCALVES LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA RB FT LT 230 kV RIB.GONCALVES /BALSAS C-1 PI/MA 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 299,005.74
  RIB.GONCALVES MC 69 kV TR 230/69 kV RIB.GONCALVES TR2 PI RBF FT TR 230/69 kV RIB.GONCALVES TR2 PI 001/2009 IPCA RBNI REA 8542/2020 28/12/2021 28/12/2049 313,757.48
  RIB.GONCALVES MG 500 kV RIB.GONCALVES MG3 PI RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2047 562,202.07
  RIB.GONCALVES TR 500/230 kV RIB.GONCALVES TRR1 PI RB FT TR 500/230 kV RIB.GONCALVES TRR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 566,890.49
  RIB.GONCALVES MC 500 kV TR 500/230 kV RIB.GONCALVES TR1 PI RB FT TR 500/230 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 619,176.83
  RIB.GONCALVES MC 230 kV TR 230/69 kV RIB.GONCALVES TR2 PI RBF FT TR 230/69 kV RIB.GONCALVES TR2 PI 001/2009 IPCA RBNI REA 8542/2020 28/12/2021 28/12/2049 836,232.38
  RIB.GONCALVES MC 230 kV TR 500/230 kV RIB.GONCALVES AT2 PI RB FT TR 500/230 kV RIB.GONCALVES AT2 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2040 881,748.28
  RIB.GONCALVES TR 230/69 kV RIB.GONCALVES TR2 PI RBF FT TR 230/69 kV RIB.GONCALVES TR2 PI 001/2009 IPCA RBNI REA 8542/2020 28/12/2021 28/12/2056 890,597.97
  RIB.GONCALVES IB 500 kV MG 500 kV RIB.GONCALVES MG3 PI IB2 RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2046 1,519,242.74
  RIB.GONCALVES MC 500 kV TR 500/230 kV RIB.GONCALVES AT2 PI RB FT TR 500/230 kV RIB.GONCALVES AT2 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2044 1,650,108.68
  RIB.GONCALVES TR 500/230 kV RIB.GONCALVES TR1 PI RB FT TR 500/230 kV RIB.GONCALVES TR1 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 1,700,671.48
  RIB.GONCALVES MG 500 kV RIB.GONCALVES MG3 PI RB FT MG 500 kV RIB.GONCALVES MG3 PI 001/2009 IPCA RBL CC 001/2009 28/01/2009 28/01/2039 2,816,455.00
  RIB.GONCALVES TR 500/230 kV RIB.GONCALVES AT2 PI RB FT TR 500/230 kV RIB.GONCALVES AT2 PI 001/2009 IPCA RBNI REA 4745/2014 13/07/2016 13/07/2050 4,571,594.97
  RIO BRANCO 1 IB 230 kV MG 230 kV RIO BRANCO 1 MG1 AC IB1 RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 2533/2010 5/10/2012 4/10/2042 9,342.04
  RIO BRANCO 1 MC 69 kV RTN 69 kV 0 Mvar RIO BRANCO 1 RN1 AC RB FT RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,653.70
  RIO BRANCO 1 RTN 69 kV 0 Mvar RIO BRANCO 1 RN1 AC RB FT RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 5746/2016 24/04/2018 24/04/2049 19,272.47
  RIO BRANCO 1 RTS 230 kV 0 Mvar RIO BRANCO 1 RLC5 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC5 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2053 57,755.27
  RIO BRANCO 1 RTS 230 kV 0 Mvar RIO BRANCO 1 RLC4 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC4 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2053 57,755.27
  RIO BRANCO 1 RTS 230 kV 0 Mvar RIO BRANCO 1 RLC3 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC3 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2053 57,755.27
  RIO BRANCO 1 RTS 230 kV 0 Mvar RIO BRANCO 1 RLC2 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC2 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2053 57,755.27
  RIO BRANCO 1 RTS 230 kV 0 Mvar RIO BRANCO 1 RLC1 AC RB FT BC 230 kV 18 Mvar RIO BRANCO 1 BC1 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2053 57,755.27
  RIO BRANCO 1 MC 69 kV TR 230/69 kV RIO BRANCO 1 TR2 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  RIO BRANCO 1 MC 69 kV TR 230/69 kV RIO BRANCO 1 TR1 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95

 

154 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 5746/2016 24/04/2018 24/04/2049 74,649.23
  RIO BRANCO 1 MC 230 kV RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC RB FT RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  RIO BRANCO 1 IB 230 kV MG 230 kV RIO BRANCO 1 MG1 AC IB1 RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 131,664.78
  RIO BRANCO 1 MC 230 kV RTB 230 kV 20 Mvar RIO BRANCO 1 RT2 AC RB FT RTB 230 kV 20 Mvar RIO BRANCO 1 RT2 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 159,659.49
  RIO BRANCO 1 MC 230 kV TR 230/69 kV RIO BRANCO 1 TR2 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 166,361.33
  RIO BRANCO 1 MC 230 kV TR 230/69 kV RIO BRANCO 1 TR1 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 166,361.33
  RIO BRANCO 1 MC 230 kV TR 230/138 kV RIO BRANCO 1 TR1 AC RBF FT TR 230/138 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 166,361.33
  RIO BRANCO 1 EL 138 kV RIO BRANCO 1  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 190,467.63
  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 4857/2014 12/9/2016 11/9/2042 196,573.38
  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 2533/2010 5/10/2012 4/10/2039 224,513.77
  RIO BRANCO 1 MC 230 kV RTL 230 kV 30 Mvar RIO BRANCO 1 RT3 AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 225,484.36
  RIO BRANCO 1 EL 230 kV RIO BRANCO 1 LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-1 RO/AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,776.23
  RIO BRANCO 1 RTB 230 kV 20 Mvar RIO BRANCO 1 RT2 AC RB FT RTB 230 kV 20 Mvar RIO BRANCO 1 RT2 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 245,934.80
  RIO BRANCO 1 RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC RB FT RTL 230 kV 30 Mvar RIO BRANCO 1 RT1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 262,121.78
  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 2911/2011 9/9/2013 8/9/2041 272,243.71
  RIO BRANCO 1 BC 230 kV 18 Mvar RIO BRANCO 1 BC1 AC RB FT BC 230 kV 18 Mvar RIO BRANCO 1 BC1 AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 282,312.61
  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2049 300,440.72
  RIO BRANCO 1 MC 69 kV TR 230/69 kV RIO BRANCO 1 TR4 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR4 AC 058/2001 IPCA RBNI REA 5746/2016 24/04/2018 24/04/2040 305,504.10
  RIO BRANCO 1 TR 230/138 kV RIO BRANCO 1 TR1 AC RBF FT TR 230/138 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 311,990.56
  RIO BRANCO 1 MC 69 kV TR 230/69 kV RIO BRANCO 1 TR3 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR3 AC 058/2001 IPCA RBNI REA 2533/2010 5/10/2012 4/10/2042 344,443.83
  RIO BRANCO 1 TR 230/69 kV RIO BRANCO 1 TR2 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  RIO BRANCO 1 TR 230/69 kV RIO BRANCO 1 TR1 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  RIO BRANCO 1 MC 230 kV BC 230 kV 18 Mvar RIO BRANCO 1 BC1 AC RB FT BC 230 kV 18 Mvar RIO BRANCO 1 BC1 AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 510,282.93
  RIO BRANCO 1 MC 230 kV CE 55/-20 Mvar RIO BRANCO 1 CE1 AC RB FT CE 55/-20 Mvar RIO BRANCO 1 CE1 AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 511,377.71
  RIO BRANCO 1 IB 138 kV MG 230 kV RIO BRANCO 1 MG1 AC IB1 DIT   058/2001 IPCA RCDM REA 2911/2011 9/9/2013 8/9/2043 564,127.62
  RIO BRANCO 1 BC 230 kV 0 Mvar RIO BRANCO 1 BC5 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC5 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2038 593,460.46
  RIO BRANCO 1 BC 230 kV 0 Mvar RIO BRANCO 1 BC4 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC4 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2038 593,460.46
  RIO BRANCO 1 BC 230 kV 0 Mvar RIO BRANCO 1 BC3 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC3 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2038 593,460.46
  RIO BRANCO 1 BC 230 kV 0 Mvar RIO BRANCO 1 BC2 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC2 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2038 593,460.46
  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 617,488.82
  RIO BRANCO 1 MC 230 kV BC 230 kV 0 Mvar RIO BRANCO 1 BC5 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC5 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2041 617,736.00
  RIO BRANCO 1 MC 230 kV BC 230 kV 0 Mvar RIO BRANCO 1 BC4 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC4 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2041 617,736.00
  RIO BRANCO 1 MC 230 kV BC 230 kV 0 Mvar RIO BRANCO 1 BC3 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC3 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2041 617,736.00
  RIO BRANCO 1 MC 230 kV BC 230 kV 0 Mvar RIO BRANCO 1 BC2 AC RB FT BC 230 kV 0 Mvar RIO BRANCO 1 BC2 AC 058/2001 IPCA RBNI REA 5688/2016 18/10/2018 18/10/2041 617,736.00
  RIO BRANCO 1 RTB 230 kV 0 Mvar RIO BRANCO 1 RT4 AC RB FT RTB 230 kV 0 Mvar RIO BRANCO 1 RT4 AC 058/2001 IPCA RBNI REA 4857/2014 12/9/2016 11/9/2051 618,564.12
  RIO BRANCO 1 MC 230 kV TR 230/69 kV RIO BRANCO 1 TR4 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR4 AC 058/2001 IPCA RBNI REA 5746/2016 24/04/2018 24/04/2041 674,754.40
  RIO BRANCO 1 RTL 230 kV 30 Mvar RIO BRANCO 1 RT3 AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 685,364.32
  RIO BRANCO 1 EL 230 kV RIO BRANCO 1 LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC RB FT LT 230 kV ABUNA /RIO BRANCO 1 C-2 RO/AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 688,118.00
  RIO BRANCO 1 MC 138 kV TR 230/138 kV RIO BRANCO 1 TR1 AC RBF FT TR 230/138 kV RIO BRANCO 1 TR1 AC 058/2001 IPCA RBNI REA 2911/2011 9/9/2013 8/9/2045 720,802.78
  RIO BRANCO 1 MC 138 kV TR 230/138 kV RIO BRANCO 1 TR2 AC RBF FT TR 230/138 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBNI REA 2911/2011 2/9/2013 1/9/2042 724,143.33
  RIO BRANCO 1 MC 230 kV TR 230/69 kV RIO BRANCO 1 TR3 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR3 AC 058/2001 IPCA RBNI REA 2533/2010 5/10/2012 4/10/2042 829,074.16
  RIO BRANCO 1 MC 230 kV TR 230/138 kV RIO BRANCO 1 TR2 AC RBF FT TR 230/138 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBNI REA 2911/2011 2/9/2013 1/9/2042 858,709.23
  RIO BRANCO 1 MC 230 kV RTB 230 kV 0 Mvar RIO BRANCO 1 RT4 AC RB FT RTB 230 kV 0 Mvar RIO BRANCO 1 RT4 AC 058/2001 IPCA RBNI REA 4857/2014 12/9/2016 11/9/2045 875,570.21
  RIO BRANCO 1 MG 230 kV RIO BRANCO 1 MG1 AC RB FT MG 230 kV RIO BRANCO 1 MG1 AC 058/2001 IPCA RBNI REA 2911/2011 9/9/2013 8/9/2041 996,250.94
  RIO BRANCO 1 TR 230/138 kV RIO BRANCO 1 TR2 AC RBF FT TR 230/138 kV RIO BRANCO 1 TR2 AC 058/2001 IPCA RBNI REA 2911/2011 2/9/2013 1/9/2046 1,031,460.67
  RIO BRANCO 1 TR 230/69 kV RIO BRANCO 1 TR3 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR3 AC 058/2001 IPCA RBNI REA 2533/2010 5/10/2012 4/10/2046 1,366,748.66
  RIO BRANCO 1 TR 230/69 kV RIO BRANCO 1 TR4 AC RBF FT TR 230/69 kV RIO BRANCO 1 TR4 AC 058/2001 IPCA RBNI REA 5746/2016 24/04/2018 24/04/2052 1,612,361.00
  RIO BRANCO 1 CE 55/-20 Mvar RIO BRANCO 1 CE1 AC RB FT CE 55/-20 Mvar RIO BRANCO 1 CE1 AC 022/2009 IPCA RBL CC 022/2009 27/10/2011 19/11/2039 5,790,105.92
  RONDONOPOLIS MC 13,8 kV TT 13,8/13,8 kV RONDONOPOLIS TT1 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 29,802.75
  RONDONOPOLIS RTL 230 kV 20 MVAr RONDONOPOLIS RT4 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RMEL REN 443/2011 13/06/2017 12/6/2031 41,303.55
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RMEL REN 443/2011 9/6/2017 8/6/2031 50,545.94
  RONDONOPOLIS MC 13,8 kV TR 230/138 kV RONDONOPOLIS TR1 MT RBF FT TR 230/138 kV RONDONOPOLIS TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 50,769.23
  RONDONOPOLIS EL 13,8 kV RONDONOPOLIS  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,172.99
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,172.99
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 60,172.99
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 66,807.29
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 66,807.29
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 66,807.29
  RONDONOPOLIS IB 230 kV MG 230 kV RONDONOPOLIS MG1 MT IB1 RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBNI REA 4514/2014 3/2/2016 2/2/2044 67,831.71
  RONDONOPOLIS MC 13,8 kV BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  RONDONOPOLIS MC 13,8 kV BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  RONDONOPOLIS MC 13,8 kV BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  RONDONOPOLIS TT 13,8/13,8 kV RONDONOPOLIS TT1 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 100,542.20
  RONDONOPOLIS MC 230 kV RTL 230 kV 30 MVAr RONDONOPOLIS RT2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  RONDONOPOLIS MC 230 kV RTL 230 kV 30 MVAr RONDONOPOLIS RT1 MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  RONDONOPOLIS MC 230 kV RTL 230 kV 20 MVAr RONDONOPOLIS RT4 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC3 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 117,138.74
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 117,138.74
  RONDONOPOLIS BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT RBF FT BC 13,8 kV 9,6 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 117,138.74
  RONDONOPOLIS MG 230 kV RONDONOPOLIS MG1 MT RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBNI REA 3216/2011 23/11/2015 22/11/2043 121,607.29
  RONDONOPOLIS IB 230 kV MG 230 kV RONDONOPOLIS MG1 MT IB1 RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  RONDONOPOLIS BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,644.72
  RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR1 MT RBF FT TR 230/138 kV RONDONOPOLIS TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  RONDONOPOLIS BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 188,348.71
  RONDONOPOLIS MC 230 kV BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 190,801.96
  RONDONOPOLIS MG 230 kV RONDONOPOLIS MG1 MT RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBNI REA 3216/2011 23/11/2015 22/11/2043 193,109.04
  RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 204,396.72
  RONDONOPOLIS MC 230 kV BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 211,838.62
  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV RONDONOPOLIS /COXIPO C-1 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV RONDONOPOLIS /COXIPO C-2 MT RB FT LT 230 kV RONDONOPOLIS /COXIPO C-2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 285,067.43

 

155 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 285,067.43
  RONDONOPOLIS MG 230 kV RONDONOPOLIS MG1 MT RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBNI REA 4514/2014 3/2/2016 2/2/2043 317,364.49
  RONDONOPOLIS RTL 230 kV 20 MVAr RONDONOPOLIS RT4 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 328,076.01
  RONDONOPOLIS BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 330,247.34
  RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 358,385.66
  RONDONOPOLIS RTL 230 kV 20 MVAr RONDONOPOLIS RT4 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 364,247.67
  RONDONOPOLIS MC 230 kV BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT RB FT BC 230 kV 30 MVAr RONDONOPOLIS BC1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 371,434.14
  RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 411,079.54
  RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT1 MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 411,079.54
  RONDONOPOLIS RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT RB FT RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 411,079.54
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 421,488.98
  RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 456,402.66
  RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT1 MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 456,402.66
  RONDONOPOLIS RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT RB FT RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 456,402.66
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 467,959.77
  RONDONOPOLIS EL 230 kV RONDONOPOLIS LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 499,832.27
  RONDONOPOLIS MG 230 kV RONDONOPOLIS MG1 MT RB FT MG 230 kV RONDONOPOLIS MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 610,137.75
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR1 MT RBF FT TR 230/138 kV RONDONOPOLIS TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 619,735.70
  RONDONOPOLIS RTL 230 kV 20 MVAr RONDONOPOLIS RT4 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 638,665.53
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR1 MT RBF FT TR 230/138 kV RONDONOPOLIS TR1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 688,063.97
  RONDONOPOLIS MC 138 kV TR 230/138 kV RONDONOPOLIS TR4 MT RBF FT TR 230/138 kV RONDONOPOLIS TR4 MT 058/2001 IPCA RBNI REA 4514/2014 3/2/2016 2/2/2047 734,935.22
  RONDONOPOLIS MC 138 kV TR 230/138 kV RONDONOPOLIS TR3 MT RBF FT TR 230/138 kV RONDONOPOLIS TR3 MT 058/2001 IPCA RBNI REA 3216/2011 23/11/2015 22/11/2045 782,171.26
  RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT2 MT RB FT LT 230 kV BARRA PEIXE /RONDONOPOLIS C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 800,248.48
  RONDONOPOLIS RTL 230 kV 30 MVAr RONDONOPOLIS RT1 MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 800,248.48
  RONDONOPOLIS RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT RB FT RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 800,248.48
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR2 MT RBF FT TR 230/138 kV RONDONOPOLIS TR2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 820,512.52
  RONDONOPOLIS MC 230 kV RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT RB FT RTB 230 kV 30 MVAr RONDONOPOLIS RT3 MT 058/2001 IPCA RBNI REA 4514/2014 29/10/2015 28/10/2044 956,265.16
  RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR3 MT RBF FT TR 230/138 kV RONDONOPOLIS TR3 MT 058/2001 IPCA RBNI REA 3216/2011 23/11/2015 22/11/2045 993,911.91
  RONDONOPOLIS MC 230 kV TR 230/138 kV RONDONOPOLIS TR4 MT RBF FT TR 230/138 kV RONDONOPOLIS TR4 MT 058/2001 IPCA RBNI REA 4514/2014 3/2/2016 2/2/2045 999,785.26
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR3 MT RBF FT TR 230/138 kV RONDONOPOLIS TR3 MT 058/2001 IPCA RBNI REA 3216/2011 23/11/2015 22/11/2049 1,393,678.21
  RONDONOPOLIS TR 230/138 kV RONDONOPOLIS TR4 MT RBF FT TR 230/138 kV RONDONOPOLIS TR4 MT 058/2001 IPCA RBNI REA 4514/2014 3/2/2016 2/2/2050 1,401,478.81
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBNI REA 4512/2014 17/03/2014 16/03/2045 13,664.85
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RMEL REN 443/2011 28/10/2016 27/10/2030 23,254.25
  RUROPOLIS BC 13,8 kV 3,6 Mvar RUROPOLIS BC1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 33,806.48
  RUROPOLIS IB 13,8 kV MG 230 kV RUROPOLIS MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,890.81
  RUROPOLIS MC 13,8 kV TR 230/138 kV RUROPOLIS TR3 PA RBF FT TR 230/138 kV RUROPOLIS TR3 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 12/7/2038 35,178.89
  RUROPOLIS IB 13,8 kV MG 230 kV RUROPOLIS MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 38,737.66
  RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 12/7/2044 47,319.14
  RUROPOLIS EL 13,8 kV RUROPOLIS  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  RUROPOLIS EL 13,8 kV RUROPOLIS  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  RUROPOLIS EL 13,8 kV RUROPOLIS  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,041.57
  RUROPOLIS EL 13,8 kV RUROPOLIS  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,041.57
  RUROPOLIS IB 13,8 kV MG 230 kV RUROPOLIS MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 67,921.94
  RUROPOLIS MC 13,8 kV BC 13,8 kV 3,6 Mvar RUROPOLIS BC1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBNI REN 443/2011 22/10/2015 21/10/2046 85,625.36
  RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBNI REN 443/2011 22/05/2017 21/05/2048 89,115.46
  RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT2 PA RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  RUROPOLIS EL 13,8 kV RUROPOLIS  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 110,535.98
  RUROPOLIS EL 13,8 kV RUROPOLIS  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 110,535.98
  RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT2 PA RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 115,924.68
  RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 115,924.68
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,982.73
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,982.73
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 129,880.53
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 129,880.53
  RUROPOLIS EL 138 kV RUROPOLIS  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,404.50
  RUROPOLIS EL 138 kV RUROPOLIS  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,404.50
  RUROPOLIS EL 138 kV RUROPOLIS  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 147,002.61
  RUROPOLIS EL 138 kV RUROPOLIS  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 147,002.61
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 156,815.21
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 156,815.21
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 174,104.70
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 174,104.70
  RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT2 PA RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 203,260.32
  RUROPOLIS MC 230 kV RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 203,260.32
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 227,730.27
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 227,730.27
  RUROPOLIS EL 230 kV RUROPOLIS LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 233,216.46
  RUROPOLIS EL 138 kV RUROPOLIS  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 257,751.81
  RUROPOLIS EL 138 kV RUROPOLIS  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 257,751.81
  RUROPOLIS EL 230 kV RUROPOLIS LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 258,929.48
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 305,272.15
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 305,272.15
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT2 PA RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 411,079.54
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 411,079.54
  RUROPOLIS TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 421,488.98
  RUROPOLIS TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 421,488.98
  RUROPOLIS EL 230 kV RUROPOLIS LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 454,002.45
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT2 PA RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 456,402.66
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 456,402.66
  RUROPOLIS TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 467,959.77
  RUROPOLIS TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 467,959.77
  RUROPOLIS IB 138 kV MG 230 kV RUROPOLIS MG1 PA IB1 DIT   058/2001 IPCA RCDM REA 3361/2012 22/10/2015 21/10/2044 572,366.38
  RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 584,642.11
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBNI REA 3361/2012 7/4/2016 6/4/2045 614,073.20

 

156 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBNI REA 3361/2012 24/10/2016 23/10/2045 622,612.54
  RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 649,101.17
  RUROPOLIS EL 138 kV RUROPOLIS  DIST2 DIT   058/2001 IPCA RCDM REA 3361/2012 22/10/2015 21/10/2044 683,169.89
  RUROPOLIS EL 138 kV RUROPOLIS  DIST1 DIT   058/2001 IPCA RCDM REA 3361/2012 22/05/2017 21/05/2046 710,434.92
  RUROPOLIS EL 230 kV RUROPOLIS LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBNI REA 3361/2012 21/06/2016 20/06/2045 718,780.81
  RUROPOLIS IB 230 kV MG 230 kV RUROPOLIS MG1 PA IB1 RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 12/7/2045 750,720.89
  RUROPOLIS MC 138 kV TR 230/138 kV RUROPOLIS TR3 PA RBF FT TR 230/138 kV RUROPOLIS TR3 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 12/7/2044 766,087.62
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBNI REA 3361/2012 7/4/2016 6/4/2045 772,065.46
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBNI REA 3361/2012 24/10/2016 23/10/2045 782,402.36
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT2 PA RB FT RTL 230 kV 30 MVAr RUROPOLIS RT2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 800,248.48
  RUROPOLIS RTL 230 kV 30 MVAr RUROPOLIS RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 800,248.48
  RUROPOLIS TR 230/138 kV RUROPOLIS TR2 PA RBF FT TR 230/138 kV RUROPOLIS TR2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 820,512.52
  RUROPOLIS TR 230/138 kV RUROPOLIS TR1 PA RBF FT TR 230/138 kV RUROPOLIS TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 820,512.52
  RUROPOLIS EL 138 kV RUROPOLIS  DIST3 DIT   058/2001 IPCA RCDM REN 443/2011 22/10/2015 21/10/2042 826,922.83
  RUROPOLIS EL 138 kV RUROPOLIS  DIST4 DIT   058/2001 IPCA RCDM REN 443/2011 22/05/2017 21/05/2044 864,863.61
  RUROPOLIS MC 230 kV TR 230/138 kV RUROPOLIS TR3 PA RBF FT TR 230/138 kV RUROPOLIS TR3 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 12/7/2044 936,845.66
  RUROPOLIS MG 230 kV RUROPOLIS MG1 PA RB FT MG 230 kV RUROPOLIS MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,138,122.70
  RUROPOLIS TR 230/138 kV RUROPOLIS TR3 PA RBF FT TR 230/138 kV RUROPOLIS TR3 PA 058/2001 IPCA RBNI REA 3361/2012 13/07/2015 12/7/2049 1,364,072.98
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBNI REA 5861/2016 19/06/2019 18/06/2034 14,239.13
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBNI REA 5861/2016 19/06/2019 18/06/2034 14,239.13
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /ARIQUEMES C-1 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-1 RO 058/2001 IPCA RBNI REA 5861/2016 19/06/2019 18/06/2034 14,239.13
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-3 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-3 RO 021/2009 IPCA RBNI REA 8314/2019 26/08/2021 25/08/2036 26,889.93
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /ARIQUEMES C-3 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-3 RO 021/2009 IPCA RBNI REA 8314/2019 26/08/2021 25/08/2036 26,889.93
  SAMUEL MG 230 kV SAMUEL MG1 RO RB FT MG 230 kV SAMUEL MG1 RO 058/2001 IPCA RMEL REN 443/2011 1/9/2016 31/08/2033 54,705.81
  SAMUEL IB 230 kV MG 230 kV SAMUEL MG1 RO IB1 RB FT MG 230 kV SAMUEL MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBNI REA 5833/2016 20/10/2017 19/10/2047 167,816.92
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBNI REA 5833/2016 20/10/2017 19/10/2047 167,816.92
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-2 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-1 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /ARIQUEMES C-1 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  SAMUEL MG 230 kV SAMUEL MG1 RO RB FT MG 230 kV SAMUEL MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 453,275.90
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /PORTO VELHO C-3 RO RB FT LT 230 kV SAMUEL /PORTO VELHO C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 671,879.23
  SAMUEL EL 230 kV SAMUEL LT 230 kV SAMUEL /ARIQUEMES C-3 RO RB FT LT 230 kV SAMUEL /ARIQUEMES C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 671,879.23
  SANTA MARIA EL 230 kV SANTA MARIA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2040 1,304.09
  SANTA MARIA TR 230/69 kV SANTA MARIA TF1 PA RBF FT TR 230/69 kV SANTA MARIA TF1 PA 058/2001 IPCA RMEL REN 443/2011 20/06/2017 19/06/2040 20,272.54
  SANTA MARIA EL 138 kV SANTA MARIA  MRSR-LI5-01 DIT   058/2001 IPCA RCDM REA 2911/2011 21/06/2017 20/06/2045 30,721.44
  SANTA MARIA EL 69 kV SANTA MARIA  TMSR-LI4-02 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,772.00
  SANTA MARIA EL 69 kV SANTA MARIA  TMSR-LI4-01 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,772.00
  SANTA MARIA EL 69 kV SANTA MARIA  TMSR-LI4-01 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 87,456.92
  SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBNI REA 2911/2011 12/12/2016 11/12/2044 105,701.19
  SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBNI REA 2911/2011 26/09/2016 25/09/2044 105,909.47
  SANTA MARIA MC 138 kV TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,982.73
  SANTA MARIA EL 138 kV SANTA MARIA  MRSR-LI5-01 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,404.50
  SANTA MARIA MC 138 kV TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBNI REA 539/2006 26/09/2016 25/09/2046 143,611.78
  SANTA MARIA EL 138 kV SANTA MARIA  MRSR-LI5-01 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 147,002.61
  SANTA MARIA IB 230 kV MG 230 kV SANTA MARIA MG1 PA IB1 RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  SANTA MARIA EL 69 kV SANTA MARIA  TMSR-LI4-01 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 153,345.43
  SANTA MARIA IB 230 kV MG 230 kV SANTA MARIA MG1 PA IB1 RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBNI REA 2911/2011 16/12/2013 15/12/2044 171,251.23
  SANTA MARIA MC 230 kV TR 230/69 kV SANTA MARIA TF2 PA RBF FT TR 230/69 kV SANTA MARIA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  SANTA MARIA MC 230 kV TR 230/69 kV SANTA MARIA TF1 PA RBF FT TR 230/69 kV SANTA MARIA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  SANTA MARIA MC 230 kV TR 230/69 kV SANTA MARIA TF1 PA RBF FT TR 230/69 kV SANTA MARIA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 193,954.55
  SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 193,954.55
  SANTA MARIA EL 230 kV SANTA MARIA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  SANTA MARIA EL 138 kV SANTA MARIA  MRSR-LI5-01 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 257,751.81
  SANTA MARIA EL 230 kV SANTA MARIA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,563.91
  SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBNI REA 2911/2011 31/08/2016 30/08/2044 294,877.89
  SANTA MARIA MC 230 kV TR 230/69 kV SANTA MARIA TF1 PA RBF FT TR 230/69 kV SANTA MARIA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 340,076.54
  SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 340,076.54
  SANTA MARIA BC 230 kV 55 Mvar SANTA MARIA BC2 PA RB FT BC 230 kV 55 Mvar SANTA MARIA BC2 PA 058/2001 IPCA RBNI REA 2911/2011 29/04/2014 28/04/2034 352,700.36
  SANTA MARIA BC 230 kV 55 Mvar SANTA MARIA BC1 PA RB FT BC 230 kV 55 Mvar SANTA MARIA BC1 PA 058/2001 IPCA RBNI REA 2911/2011 29/04/2014 28/04/2034 352,700.36
  SANTA MARIA TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 421,488.98
  SANTA MARIA TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 421,488.98
  SANTA MARIA TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 467,959.77
  SANTA MARIA TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 467,959.77
  SANTA MARIA TR 230/69 kV SANTA MARIA TF2 PA RBF FT TR 230/69 kV SANTA MARIA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 472,137.00
  SANTA MARIA TR 230/69 kV SANTA MARIA TF1 PA RBF FT TR 230/69 kV SANTA MARIA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 472,137.00
  SANTA MARIA EL 230 kV SANTA MARIA LT 230 kV CASTANHAL /SANTA MARIA C-2 PA RB FT LT 230 kV CASTANHAL /SANTA MARIA C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 483,168.97
  SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBNI REA 2911/2011 29/04/2014 28/04/2039 498,372.80
  SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBNI REA 2911/2011 31/08/2016 30/08/2045 560,310.74
  SANTA MARIA IB 138 kV MG 230 kV SANTA MARIA MG1 PA IB1 DIT   058/2001 IPCA RCDM REA 2911/2011 31/08/2016 30/08/2048 597,725.20
  SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 603,354.14
  SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 669,876.28
  SANTA MARIA MC 138 kV TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBNI REA 2911/2011 12/12/2016 11/12/2045 746,279.29
  SANTA MARIA MC 138 kV TR 230/138 kV SANTA MARIA TR3 PA RBF FT TR 230/138 kV SANTA MARIA TR3 PA 058/2001 IPCA RBNI REA 2911/2011 31/08/2016 30/08/2045 787,698.39
  SANTA MARIA EL 138 kV SANTA MARIA  DIST2 DIT   058/2001 IPCA RCDM REA 2911/2011 21/06/2017 20/06/2046 800,207.39
  SANTA MARIA TR 230/138 kV SANTA MARIA TRR1 PA RBF FT TR 230/138 kV SANTA MARIA TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 820,512.52
  SANTA MARIA TR 230/138 kV SANTA MARIA TR1 PA RBF FT TR 230/138 kV SANTA MARIA TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 820,512.52
  SANTA MARIA MC 230 kV BC 230 kV 55 Mvar SANTA MARIA BC1 PA RB FT BC 230 kV 55 Mvar SANTA MARIA BC1 PA 058/2001 IPCA RBNI REA 2911/2011 29/04/2014 28/04/2044 959,486.26
  SANTA MARIA MC 230 kV BC 230 kV 55 Mvar SANTA MARIA BC2 PA RB FT BC 230 kV 55 Mvar SANTA MARIA BC2 PA 058/2001 IPCA RBNI REA 2911/2011 29/04/2014 28/04/2044 960,256.94
  SANTA MARIA MC 230 kV TR 230/138 kV SANTA MARIA TR3 PA RBF FT TR 230/138 kV SANTA MARIA TR3 PA 058/2001 IPCA RBNI REA 2911/2011 31/08/2016 30/08/2045 962,619.01
  SANTA MARIA MG 230 kV SANTA MARIA MG1 PA RB FT MG 230 kV SANTA MARIA MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,174,549.42
  SANTA MARIA TR 230/138 kV SANTA MARIA TR3 PA RBF FT TR 230/138 kV SANTA MARIA TR3 PA 058/2001 IPCA RBNI REA 2911/2011 31/08/2016 30/08/2050 1,398,359.50
  SAO LUIS I TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RMEL REN 443/2011 18/06/2017 17/06/2040 6,164.55
  SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RMEL REN 443/2011 23/07/2017 22/07/2040 6,183.89

 

157 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  SAO LUIS I TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2040 19,321.70
  SAO LUIS I TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RMEL REN 443/2011 18/06/2017 17/06/2040 19,419.21
  SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RMEL REN 443/2011 23/07/2017 22/07/2040 19,480.14
  SAO LUIS I EL 230 kV SAO LUIS I LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RMEL REN 443/2011 17/09/2017 16/09/2040 19,577.64
  SAO LUIS I EL 230 kV SAO LUIS I LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RMEL REN 443/2011 24/09/2017 23/09/2040 19,589.82
  SAO LUIS I TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RMEL REN 443/2011 30/07/2017 29/07/2040 19,736.30
  SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RMEL REN 443/2011 7/5/2017 6/5/2031 26,447.87
  SAO LUIS I TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RMEL REN 443/2011 29/05/2017 28/05/2031 26,523.27
  SAO LUIS I TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RMEL REN 443/2011 11/6/2017 10/6/2031 26,629.07
  SAO LUIS I IB 13,8 kV MG 230 kV SAO LUIS I MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,890.81
  SAO LUIS I IB 69 kV MG 230 kV SAO LUIS I MG1 MA IB3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,894.81
  SAO LUIS I IB 69 kV MG 230 kV SAO LUIS I MG1 MA IB2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,894.81
  SAO LUIS I IB 69 kV MG 230 kV SAO LUIS I MG1 MA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,894.81
  SAO LUIS I MG 230 kV SAO LUIS I MG1 MA RB FT MG 230 kV SAO LUIS I MG1 MA 058/2001 IPCA RBNI REN 443/2011 29/06/2017 28/06/2045 53,806.75
  SAO LUIS I MC 13,8 kV TR 69/13,8 kV SAO LUIS I TR1 MA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 55,100.62
  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST8 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST7 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  SAO LUIS I EL 13,8 kV SAO LUIS I  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  SAO LUIS I MC 69 kV TR 69/13,8 kV SAO LUIS I TR1 MA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 79,116.64
  SAO LUIS I EL 69 kV SAO LUIS I  DIST8 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  SAO LUIS I EL 69 kV SAO LUIS I  DIST7 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  SAO LUIS I EL 69 kV SAO LUIS I  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  SAO LUIS I EL 69 kV SAO LUIS I  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  SAO LUIS I EL 69 kV SAO LUIS I  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  SAO LUIS I EL 69 kV SAO LUIS I  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  SAO LUIS I EL 69 kV SAO LUIS I  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  SAO LUIS I EL 69 kV SAO LUIS I  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  SAO LUIS I EL 69 kV SAO LUIS I  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,493.13
  SAO LUIS I EL 69 kV SAO LUIS I  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,493.13
  SAO LUIS I TR 69/13,8 kV SAO LUIS I TR1 MA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,963.20
  SAO LUIS I MC 69 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 138,721.74
  SAO LUIS I IB 230 kV MG 230 kV SAO LUIS I MG1 MA IB1 RB FT MG 230 kV SAO LUIS I MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  SAO LUIS I EL 69 kV SAO LUIS I  DIST6 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 162,175.84
  SAO LUIS I EL 69 kV SAO LUIS I  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 162,175.84
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 204,396.72
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 204,396.72
  SAO LUIS I EL 230 kV SAO LUIS I LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  SAO LUIS I EL 230 kV SAO LUIS I LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  SAO LUIS I EL 230 kV SAO LUIS I LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 285,067.43
  SAO LUIS I EL 69 kV SAO LUIS I  MARACANA 2 DIT   007/2008 IPCA RCDM REN 443/2011 29/06/2017 28/06/2040 332,932.14
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 358,385.66
  SAO LUIS I MC 230 kV TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 358,385.66
  SAO LUIS I TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  SAO LUIS I TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  SAO LUIS I TR 230/69 kV SAO LUIS I TF2 MA RBF FT TR 230/69 kV SAO LUIS I TF2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,586.17
  SAO LUIS I TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 445,862.60
  SAO LUIS I TR 230/69 kV SAO LUIS I TF3 MA RBF FT TR 230/69 kV SAO LUIS I TF3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 445,862.60
  SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 445,862.60
  SAO LUIS I MG 230 kV SAO LUIS I MG1 MA RB FT MG 230 kV SAO LUIS I MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 680,031.67
  SAO LUIS I TR 230/69 kV SAO LUIS I TF4 MA RBF FT TR 230/69 kV SAO LUIS I TF4 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 781,767.73
  SAO LUIS I TR 230/69 kV SAO LUIS I TF1 MA RBF FT TR 230/69 kV SAO LUIS I TF1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 781,767.73
  SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RMEL REN 443/2011 20/10/2017 19/10/2042 6,009.72
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RMEL REN 443/2011 3/12/2017 2/12/2040 6,570.57
  SAO LUIS II MC 69 kV RTN 69 kV 0 Mvar SAO LUIS II RN2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,653.70
  SAO LUIS II MC 69 kV RTN 69 kV 0 Mvar SAO LUIS II RN1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,653.70
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2047 11,099.12
  SAO LUIS II RTN 69 kV 0 Mvar SAO LUIS II RN2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  SAO LUIS II RTN 69 kV 0 Mvar SAO LUIS II RN1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  SAO LUIS II TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RMEL REN 443/2011 6/7/2017 5/7/2040 19,450.54
  SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RMEL REN 443/2011 7/7/2017 6/7/2040 19,452.28
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RMEL REN 443/2011 6/8/2017 5/8/2040 19,504.52
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051 25,291.68
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051 25,291.68
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051 25,291.68
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051 25,291.68
  SAO LUIS II EL 500 kV SAO LUIS II LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RMEL REN 443/2011 5/2/2017 4/2/2040 26,600.88
  SAO LUIS II RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RMEL REN 443/2011 9/6/2017 8/6/2040 26,900.18
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051 30,881.85
  SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RMEL REN 443/2011 27/07/2017 26/07/2051 32,074.96
  SAO LUIS II RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RMEL REN 443/2011 26/04/2017 25/04/2031 39,910.18
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2040 41,085.25

 

158 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RMEL REN 443/2011 27/07/2017 26/07/2047 79,335.50
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2047 113,333.75
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051 121,140.08
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RMEL REN 443/2011 29/12/2017 28/12/2051 121,140.08
  SAO LUIS II IB 230 kV MG 500 kV SAO LUIS II MG1 MA IB2 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  SAO LUIS II IB 230 kV MG 500 kV SAO LUIS II MG1 MA IB1 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  SAO LUIS II MC 230 kV CE 150/-100 MvAr SAO LUIS II CE1 MA RB FT CE 150/-100 MvAr SAO LUIS II CE1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 171,857.30
  SAO LUIS II MC 230 kV TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  SAO LUIS II MC 230 kV TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  SAO LUIS II MC 230 kV TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  SAO LUIS II MC 230 kV BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 189,533.79
  SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 189,533.79
  SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 189,533.79
  SAO LUIS II MC 230 kV BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA RB FT BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 189,533.79
  SAO LUIS II MC 230 kV TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 204,396.72
  SAO LUIS II MC 230 kV BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,430.63
  SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,430.63
  SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 210,430.63
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB4 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBNI REA 7814/2019 16/08/2021 16/08/2051 211,289.99
  SAO LUIS II BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA RB FT BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 218,361.98
  SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 226,546.59
  SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 226,546.59
  SAO LUIS II BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 235,438.07
  SAO LUIS II BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA RB FT BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 242,437.23
  SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 251,524.23
  SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 251,524.23
  SAO LUIS II RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA RB FT RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 255,407.76
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /MIRANDA II C-1 MA RB FT LT 230 kV SAO LUIS II /MIRANDA II C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  SAO LUIS II BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 261,396.03
  SAO LUIS II RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA RB FT RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 283,567.46
  SAO LUIS II RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA RB FT RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 284,346.74
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS I C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 285,067.43
  SAO LUIS II EL 230 kV SAO LUIS II LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 310,739.81
  SAO LUIS II RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA RB FT RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 315,697.08
  SAO LUIS II MC 230 kV BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 368,965.41
  SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 368,965.41
  SAO LUIS II MC 230 kV BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 368,965.41
  SAO LUIS II MC 500 kV RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 403,570.80
  SAO LUIS II BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA RB FT BC 230 kV 50,8 MVAr SAO LUIS II BC1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 425,085.22
  SAO LUIS II MG 500 kV SAO LUIS II MG1 MA RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBNI REA 7814/2019 16/08/2021 16/08/2052 435,549.68
  SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC4 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 441,018.21
  SAO LUIS II BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA RB FT BC 230 kV 55,5 MVAr SAO LUIS II BC3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 441,018.21
  SAO LUIS II MC 500 kV RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 448,066.05
  SAO LUIS II BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA RB FT BC 230 kV 61,1 MVAr SAO LUIS II BC2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 458,327.25
  SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 471,137.52
  SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 471,137.52
  SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 471,137.52
  SAO LUIS II RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA RB FT RTL 500 kV 33,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 497,202.26
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB3 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB2 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB1 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 523,082.26
  SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 523,082.26
  SAO LUIS II EL 500 kV SAO LUIS II LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  SAO LUIS II EL 500 kV SAO LUIS II LT 500 kV SAO LUIS II /BACABEIRA C-1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  SAO LUIS II RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA RB FT RTB 500 kV 45,3 MVAr SAO LUIS II RTR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 553,537.76
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB3 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB2 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB1 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  SAO LUIS II EL 500 kV SAO LUIS II LT 500 kV SAO LUIS II /BACABEIRA C-2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  SAO LUIS II MG 500 kV SAO LUIS II MG1 MA RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2042 646,066.67
  SAO LUIS II TR 500/230 kV SAO LUIS II TRR1 MA RB FT TR 500/230 kV SAO LUIS II TRR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 707,515.01
  SAO LUIS II RTL 500 kV 100 MVAr SAO LUIS II RT2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 766,502.54
  SAO LUIS II RTL 500 kV 100 Mvar SAO LUIS II RT1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 766,502.54
  SAO LUIS II TR 500/230 kV SAO LUIS II TRR1 MA RB FT TR 500/230 kV SAO LUIS II TRR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 785,521.29
  SAO LUIS II RTL 500 kV 100 MVAr SAO LUIS II RT2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 851,012.42
  SAO LUIS II RTL 500 kV 100 Mvar SAO LUIS II RT1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 851,012.42
  SAO LUIS II RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 853,040.23
  SAO LUIS II MC 230 kV CE 150/-100 Mvar SAO LUIS II CE2 MA RB FT CE 150/-100 Mvar SAO LUIS II CE2 MA 058/2001 IPCA RBNI REA 2270/2010 16/12/2013 15/12/2044 891,888.21
  SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 917,163.33
  SAO LUIS II RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 947,091.23
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB3 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 973,306.35
  SAO LUIS II MC 230 kV TR 500/230 kV SAO LUIS II TR4 MA RB FT TR 500/230 kV SAO LUIS II TR4 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2045 1,004,133.76
  SAO LUIS II MG 500 kV SAO LUIS II MG1 MA RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBNI REA 2270/2010 16/12/2013 15/12/2040 1,254,235.20
  SAO LUIS II IB 500 kV MG 500 kV SAO LUIS II MG1 MA IB4 RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2045 1,284,061.12
  SAO LUIS II TR 500/230 kV SAO LUIS II TRR1 MA RB FT TR 500/230 kV SAO LUIS II TRR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,377,319.36
  SAO LUIS II RTL 500 kV 100 MVAr SAO LUIS II RT2 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,492,150.37
  SAO LUIS II RTL 500 kV 100 Mvar SAO LUIS II RT1 MA RB FT LT 500 kV SAO LUIS II /BACABEIRA C-1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,492,150.37
  SAO LUIS II MC 500 kV TR 500/230 kV SAO LUIS II TR4 MA RB FT TR 500/230 kV SAO LUIS II TR4 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2045 1,555,469.94
  SAO LUIS II MC 500 kV RTB 500 kV 45,33 Mvar SAO LUIS II RT4 MA RB FT RTB 500 kV 45,33 Mvar SAO LUIS II RT4 MA 058/2001 IPCA RBNI REA 7814/2019 16/08/2021 16/08/2050 1,596,206.67
  SAO LUIS II RTB 500 kV 136 MVAr SAO LUIS II RT3 MA RB FT RTB 500 kV 136 MVAr SAO LUIS II RT3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,660,613.28
  SAO LUIS II RTB 500 kV 45,33 Mvar SAO LUIS II RT4 MA RB FT RTB 500 kV 45,33 Mvar SAO LUIS II RT4 MA 058/2001 IPCA RBNI REA 7814/2019 16/08/2021 16/08/2057 1,890,225.79
  SAO LUIS II MG 500 kV SAO LUIS II MG1 MA RB FT MG 500 kV SAO LUIS II MG1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,916,179.44
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,122,545.04

 

159 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,122,545.04
  SAO LUIS II TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,122,545.04
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,356,563.88
  SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,356,563.88
  SAO LUIS II TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,356,563.88
  SAO LUIS II CE 150/-100 MvAr SAO LUIS II CE1 MA RB FT CE 150/-100 MvAr SAO LUIS II CE1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,580,936.02
  SAO LUIS II TR 500/230 kV SAO LUIS II TR3 MA RB FT TR 500/230 kV SAO LUIS II TR3 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,131,958.09
  SAO LUIS II TR 500/230 kV SAO LUIS II TR2 MA RB FT TR 500/230 kV SAO LUIS II TR2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,131,958.09
  SAO LUIS II TR 500/230 kV SAO LUIS II TR1 MA RB FT TR 500/230 kV SAO LUIS II TR1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,131,958.09
  SAO LUIS II TR 500/230 kV SAO LUIS II TR4 MA RB FT TR 500/230 kV SAO LUIS II TR4 MA 058/2001 IPCA RBNI REA 3216/2011 26/05/2014 25/05/2048 4,699,450.22
  SAO LUIS II CE 150/-100 Mvar SAO LUIS II CE2 MA RB FT CE 150/-100 Mvar SAO LUIS II CE2 MA 058/2001 IPCA RBNI REA 2270/2010 16/12/2013 15/12/2043 8,856,575.84
  SAO LUIS III TR 230/69 kV SAO LUIS III TR2 MA RBF FT TR 230/69 kV SAO LUIS III TR2 MA 007/2008 IPCA RMEL REN 443/2011 22/10/2017 21/10/2047 96.40
  SAO LUIS III MC 13,8 kV TR 230/69 kV SAO LUIS III TR2 MA RBF FT TR 230/69 kV SAO LUIS III TR2 MA 007/2008 IPCA RBNI REA 2911/2011 1/6/2013 1/6/2048 1,647.09
  SAO LUIS III MC 69 kV TR 230/69 kV SAO LUIS III TR1 MA RBF FT TR 230/69 kV SAO LUIS III TR1 MA 007/2008 IPCA RBNI DSP 1422/2021 27/12/2021 26/12/2051 13,911.26
  SAO LUIS III MC 69 kV TR 230/69 kV SAO LUIS III TR1 MA RBF FT TR 230/69 kV SAO LUIS III TR1 MA 007/2008 IPCA RBNI DSP 1422/2021 27/12/2021 26/12/2051 13,911.26
  SAO LUIS III MC 69 kV TR 230/69 kV SAO LUIS III TR1 MA RBF FT TR 230/69 kV SAO LUIS III TR1 MA 007/2008 IPCA RBNI DSP 1422/2021 27/12/2021 26/12/2051 13,911.26
  SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REA 8348/2019 27/09/2021 27/09/2052 35,727.94
  SAO LUIS III IB 69 kV MG 230 kV SAO LUIS III MG1 MA IB1 DIT   007/2008 IPCA RPEC CC 007/2008 10/8/2010 17/03/2038 35,774.56
  SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REN 443/2011 29/06/2017 28/06/2048 39,379.63
  SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REN 443/2011 29/06/2017 28/06/2048 39,379.63
  SAO LUIS III MC 69 kV TR 230/69 kV SAO LUIS III TR1 MA RBF FT TR 230/69 kV SAO LUIS III TR1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 72,931.07
  SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REA 1581/2008 3/9/2010 3/9/2038 87,564.30
  SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REA 8348/2019 27/09/2021 27/09/2052 127,524.65
  SAO LUIS III MC 69 kV TT 69/0 kV SAO LUIS III TT1 MA DIT   007/2008 IPCA RCDM REA 1581/2008 3/9/2010 2/9/2030 133,773.96
  SAO LUIS III IB 230 kV MG 230 kV SAO LUIS III MG1 MA IB1 RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 154,898.04
  SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBNI REA 2911/2011 1/6/2013 1/6/2045 199,166.60
  SAO LUIS III MC 230 kV TR 230/69 kV SAO LUIS III TR1 MA RBF FT TR 230/69 kV SAO LUIS III TR1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 271,693.34
  SAO LUIS III MC 69 kV TR 230/69 kV SAO LUIS III TR3 MA RBF FT TR 230/69 kV SAO LUIS III TR3 MA 007/2008 IPCA RBNI REA 8348/2019 27/09/2021 27/09/2048 273,637.49
  SAO LUIS III EL 230 kV SAO LUIS III LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA RB FT LT 230 kV SAO LUIS II /SAO LUIS III C-1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 310,739.81
  SAO LUIS III TT 69/0 kV SAO LUIS III TT1 MA DIT   007/2008 IPCA RCDM REA 1581/2008 3/9/2010 3/9/2041 319,505.78
  SAO LUIS III MC 69 kV TR 230/69 kV SAO LUIS III TR2 MA RBF FT TR 230/69 kV SAO LUIS III TR2 MA 007/2008 IPCA RBNI REA 2911/2011 1/6/2013 1/6/2047 332,617.21
  SAO LUIS III EL 69 kV SAO LUIS III  OLHOS DAGUA DIT   007/2008 IPCA RCDM REN 443/2011 29/06/2017 28/06/2040 332,932.14
  SAO LUIS III EL 69 kV SAO LUIS III  ARACARY DIT   007/2008 IPCA RCDM REN 443/2011 29/06/2017 28/06/2040 332,932.14
  SAO LUIS III EL 69 kV SAO LUIS III  DIST3 DIT   007/2008 IPCA RCDM REA 1581/2008 3/9/2010 3/9/2041 358,970.58
  SAO LUIS III EL 69 kV SAO LUIS III  DIST2 DIT   007/2008 IPCA RCDM REA 1581/2008 3/9/2010 3/9/2041 358,970.58
  SAO LUIS III EL 69 kV SAO LUIS III  DIST1 DIT   007/2008 IPCA RCDM REA 1581/2008 3/9/2010 3/9/2041 358,970.58
  SAO LUIS III TR 230/69 kV SAO LUIS III TR1 MA RBF FT TR 230/69 kV SAO LUIS III TR1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 623,234.14
  SAO LUIS III MC 230 kV TR 230/69 kV SAO LUIS III TR3 MA RBF FT TR 230/69 kV SAO LUIS III TR3 MA 007/2008 IPCA RBNI REA 8348/2019 27/09/2021 27/09/2049 723,590.30
  SAO LUIS III MC 230 kV TR 230/69 kV SAO LUIS III TR2 MA RBF FT TR 230/69 kV SAO LUIS III TR2 MA 007/2008 IPCA RBNI REA 2911/2011 1/6/2013 1/6/2047 805,656.68
  SAO LUIS III MG 230 kV SAO LUIS III MG1 MA RB FT MG 230 kV SAO LUIS III MG1 MA 007/2008 IPCA RBL CC 007/2008 17/03/2008 17/03/2038 818,158.89
  SAO LUIS III TR 230/69 kV SAO LUIS III TR3 MA RBF FT TR 230/69 kV SAO LUIS III TR3 MA 007/2008 IPCA RBNI REA 8348/2019 27/09/2021 27/09/2055 1,235,369.53
  SAO LUIS III TR 230/69 kV SAO LUIS III TR2 MA RBF FT TR 230/69 kV SAO LUIS III TR2 MA 007/2008 IPCA RBNI REA 2911/2011 1/6/2013 1/6/2053 1,610,010.42
  SINOP MG 230 kV SINOP MG1 MT RB FT MG 230 kV SINOP MG1 MT 058/2001 IPCA RBNI REA 7814/2019 8/9/2020 8/9/2052 69.36
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC8 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 33,806.48
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC7 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 33,806.48
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC6 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 33,806.48
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC5 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 33,806.48
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC4 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 33,806.48
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC3 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 33,806.48
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC2 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 33,806.48
  SINOP BC 13,8 kV 3,6 Mvar SINOP BC1 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 33,806.48
  SINOP MC 13,8 kV TR 230/138 kV SINOP TR1 MT TERC RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  SINOP MC 13,8 kV TR 230/138 kV SINOP TR1 MT TERC RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 63,041.57
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC8 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 69,280.27
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC7 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 69,280.27
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC6 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 69,280.27
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC4 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 69,280.27
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC3 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 69,280.27
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC2 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 69,280.27
  SINOP MC 138 kV TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBNI REA 3102/2011 16/09/2013 15/09/2047 72,128.50
  SINOP MC 138 kV TR 230/138 kV SINOP TR1 MT RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBNI REA 3102/2011 16/09/2013 15/09/2047 72,128.50
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC5 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  SINOP MC 13,8 kV BC 13,8 kV 3,6 Mvar SINOP BC1 MT RBF FT BC 13,8 kV 3,6 Mvar SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  SINOP MC 230 kV RTL 230 kV 22,14 Mvar SINOP RT1 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  SINOP MC 230 kV RTL 230 kV 20 MVAr SINOP RT2 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  SINOP MC 13,8 kV TR 230/138 kV SINOP TR1 MT TERC RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 110,535.98
  SINOP MC 138 kV TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,982.73
  SINOP MC 138 kV TR 230/138 kV SINOP TR1 MT RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 116,982.73
  SINOP EL 230 kV SINOP LT 230 kV SINOP /SORRISO II C-1 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBNI REA 7814/2019 8/9/2020 8/9/2051 131,246.92
  SINOP EL 138 kV SINOP  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 132,404.50
  SINOP EL 138 kV SINOP  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 147,002.61
  SINOP IB 230 kV MG 230 kV SINOP MG1 MT IB1 RB FT MG 230 kV SINOP MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  SINOP BC 230 kV 30 MVAr SINOP BC1 MT RB FT BC 230 kV 30 MVAr SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,644.72
  SINOP MC 230 kV TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  SINOP MC 230 kV TR 230/138 kV SINOP TR1 MT RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  SINOP MC 230 kV CE 55/-20 Mvar SINOP CE1 MT RB FT CE 55/-20 Mvar SINOP CE1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 177,880.74
  SINOP MC 230 kV TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 193,954.55
  SINOP MC 230 kV BC 230 kV 30 MVAr SINOP BC1 MT RB FT BC 230 kV 30 MVAr SINOP BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 198,093.56
  SINOP EL 230 kV SINOP LT 230 kV SINOP /SORRISO II C-1 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  SINOP EL 138 kV SINOP  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 257,751.81
  SINOP EL 230 kV SINOP LT 230 kV SINOP /SORRISO II C-1 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 275,563.91
  SINOP RTL 230 kV 20 MVAr SINOP RT2 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 328,076.01
  SINOP MC 230 kV TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 340,076.54
  SINOP RTL 230 kV 22,14 Mvar SINOP RT1 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 348,885.73
  SINOP RTL 230 kV 20 MVAr SINOP RT2 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 364,247.67
  SINOP TR 230/138 kV SINOP TR2 MT RBF FT TR 230/138 kV SINOP TR2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 421,488.98

 

160 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  SINOP TR 230/138 kV SINOP TR1 MT RBF FT TR 230/138 kV SINOP TR1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 421,488.98
  SINOP EL 230 kV SINOP LT 230 kV SINOP /SORRISO II C-1 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 483,168.97
  SINOP IB 138 kV MG 230 kV SINOP MG1 MT IB1 DIT   058/2001 IPCA RCDM REA 3102/2011 16/09/2013 15/09/2044 530,980.10
  SINOP MG 230 kV SINOP MG1 MT RB FT MG 230 kV SINOP MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 570,948.61
  SINOP MG 230 kV SINOP MG1 MT RB FT MG 230 kV SINOP MG1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 633,897.91
  SINOP RTL 230 kV 20 MVAr SINOP RT2 MT RB FT LT 230 kV SINOP /SORRISO II C-1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 638,665.53
  SINOP MC 138 kV TR 230/138 kV SINOP TR3 MT RBF FT TR 230/138 kV SINOP TR3 MT 058/2001 IPCA RBNI REA 3102/2011 16/09/2013 15/09/2043 695,632.69
  SINOP MC 230 kV TR 230/138 kV SINOP TR3 MT RBF FT TR 230/138 kV SINOP TR3 MT 058/2001 IPCA RBNI REA 3102/2011 16/09/2013 15/09/2042 898,455.96
  SINOP MG 230 kV SINOP MG1 MT RB FT MG 230 kV SINOP MG1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,111,465.57
  SINOP TR 230/138 kV SINOP TR3 MT RBF FT TR 230/138 kV SINOP TR3 MT 058/2001 IPCA RBNI REA 3102/2011 16/09/2013 15/09/2047 1,328,023.41
  SINOP CE 55/-20 Mvar SINOP CE1 MT RB FT CE 55/-20 Mvar SINOP CE1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,744,096.32
  SORRISO BC 13,8 kV 3,6 MVAr SORRISO BC2 MT RBF FT BC 13,8 kV 3,6 MVAr SORRISO BC2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 33,806.48
  SORRISO BC 13,8 kV 3,6 MVAr SORRISO BC1 MT RBF FT BC 13,8 kV 3,6 MVAr SORRISO BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 33,806.48
  SORRISO IB 69 kV MG 230 kV SORRISO MG1 MT IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,894.81
  SORRISO EL 13,8 kV SORRISO  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  SORRISO MC 69 kV TR 230/69 kV SORRISO TF2 MT RBF FT TR 230/69 kV SORRISO TF2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  SORRISO MC 69 kV TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  SORRISO MC 13,8 kV BC 13,8 kV 3,6 MVAr SORRISO BC2 MT RBF FT BC 13,8 kV 3,6 MVAr SORRISO BC2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  SORRISO MC 13,8 kV BC 13,8 kV 3,6 MVAr SORRISO BC1 MT RBF FT BC 13,8 kV 3,6 MVAr SORRISO BC1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  SORRISO EL 69 kV SORRISO  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  SORRISO EL 69 kV SORRISO  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,493.13
  SORRISO IB 230 kV MG 230 kV SORRISO MG1 MT IB1 RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  SORRISO EL 69 kV SORRISO  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 162,175.84
  SORRISO MC 230 kV TR 230/69 kV SORRISO TF2 MT RBF FT TR 230/69 kV SORRISO TF2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  SORRISO MC 230 kV TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  SORRISO TR 230/69 kV SORRISO TF2 MT RBF FT TR 230/69 kV SORRISO TF2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 192,095.19
  SORRISO TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 192,095.19
  SORRISO MC 230 kV TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 193,954.55
  SORRISO TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 213,274.44
  SORRISO EL 230 kV SORRISO LT 230 kV SORRISO II /SORRISO C-1 MT RB FT LT 230 kV SORRISO II /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  SORRISO EL 230 kV SORRISO LT 230 kV NOVA MUTUM /SORRISO C-1 MT RB FT LT 230 kV NOVA MUTUM /SORRISO C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  SORRISO MG 230 kV SORRISO MG1 MT RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBNI REA 5713/2016 18/12/2017 17/12/2044 262,881.59
  SORRISO MC 230 kV TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 340,076.54
  SORRISO TR 230/69 kV SORRISO TF1 MT RBF FT TR 230/69 kV SORRISO TF1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 373,951.69
  SORRISO MC 69 kV TR 230/69 kV SORRISO TF3 MT RBF FT TR 230/69 kV SORRISO TF3 MT 058/2001 IPCA RBNI REA 5713/2016 18/12/2017 17/12/2047 422,740.97
  SORRISO MG 230 kV SORRISO MG1 MT RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBNI REA 5713/2016 18/12/2017 17/12/2042 497,516.07
  SORRISO MG 230 kV SORRISO MG1 MT RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 527,511.97
  SORRISO MG 230 kV SORRISO MG1 MT RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 585,672.22
  SORRISO TR 230/69 kV SORRISO TF3 MT RBF FT TR 230/69 kV SORRISO TF3 MT 058/2001 IPCA RBNI REA 5713/2016 18/12/2017 17/12/2051 1,001,078.47
  SORRISO MC 230 kV TR 230/69 kV SORRISO TF3 MT RBF FT TR 230/69 kV SORRISO TF3 MT 058/2001 IPCA RBNI REA 5713/2016 18/12/2017 17/12/2046 1,005,896.71
  SORRISO MG 230 kV SORRISO MG1 MT RB FT MG 230 kV SORRISO MG1 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,026,907.47
  SUB S.LUIS MC 13,8 kV CS 33/-31 MVAr SUB S.LUIS CS2 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,646.29
  SUB S.LUIS MC 13,8 kV CS 33/-31 MVAr SUB S.LUIS CS1 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,646.29
  SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS2 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS2 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,038,311.52
  SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS1 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS1 MA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,038,311.52
  SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS2 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,152,789.40
  SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS1 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,152,789.40
  SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS2 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS2 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,021,280.87
  SUB S.LUIS CS 33/-31 MVAr SUB S.LUIS CS1 MA RB FT CS 33/-31 MVAr SUB S.LUIS CS1 MA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,021,280.87
  TRANSAMAZONIC MC 230 kV RTL 230 kV 30 Mvar TRANSAMAZONIC RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2047 24,189.71
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 29,888.96
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 29,888.96
  TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 70,868.20
  TRANSAMAZONIC EL 34,5 kV TRANSAMAZONIC  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,772.00
  TRANSAMAZONIC EL 34,5 kV TRANSAMAZONIC  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 87,456.92
  TRANSAMAZONIC MC 230 kV RTL 230 kV 30 Mvar TRANSAMAZONIC RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 124,259.07
  TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2041 152,789.70
  TRANSAMAZONIC EL 34,5 kV TRANSAMAZONIC  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 153,345.43
  TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBNI REA 4660/2014 18/11/2016 17/11/2041 154,588.96
  TRANSAMAZONIC MC 230 kV TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 156,815.21
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 160,984.75
  TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 192,095.19
  TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 192,095.19
  TRANSAMAZONIC TT 34/34 kV TRANSAMAZONIC TA2 PA DIT   058/2001 IPCA RCDM REA 4660/2014 29/08/2016 28/08/2046 211,934.16
  TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 213,274.44
  TRANSAMAZONIC MC 230 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 233,216.46
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 235,356.94
  TRANSAMAZONIC MC 34 kV TT 34/34 kV TRANSAMAZONIC TA2 PA DIT   058/2001 IPCA RCDM REA 4660/2014 29/08/2016 28/08/2044 257,522.13
  TRANSAMAZONIC IB 34 kV MG 230 kV TRANSAMAZONIC MG1 PA IB1 DIT   058/2001 IPCA RCDM REA 4660/2014 29/08/2016 28/08/2047 264,154.46
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 269,455.57
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 269,455.57
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2044 308,346.38
  TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBNI REA 4660/2014 18/11/2016 17/11/2045 319,074.89
  TRANSAMAZONIC MC 34,5 kV TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2042 320,487.81
  TRANSAMAZONIC EL 34 kV TRANSAMAZONIC  CELPA DIT   058/2001 IPCA RCDM REA 4660/2014 29/08/2016 28/08/2046 357,904.27
  TRANSAMAZONIC TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 373,951.69
  TRANSAMAZONIC RTL 230 kV 30 Mvar TRANSAMAZONIC RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 411,079.54
  TRANSAMAZONIC RTL 230 kV 30 Mvar TRANSAMAZONIC RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 456,402.66
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 459,583.08
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 510,253.90
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 602,533.31
  TRANSAMAZONIC RTL 230 kV 30 Mvar TRANSAMAZONIC RT1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 800,248.48
  TRANSAMAZONIC IB 230 kV MG 230 kV TRANSAMAZONIC MG1 PA IB1 RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2051 840,249.67

 

161 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 894,670.31
  TRANSAMAZONIC MC 230 kV TR 230/34,5 kV TRANSAMAZONIC TF1 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF1 PA 058/2001 IPCA RBNI REA 4660/2014 18/11/2016 17/11/2045 1,136,971.02
  TRANSAMAZONIC EL 230 kV TRANSAMAZONIC LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA RB FT LT 230 kV TRANSAMAZONIC /RUROPOLIS C-1 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2045 1,426,277.88
  TRANSAMAZONIC EL 230 kV TRANSAMAZONIC LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA RB FT LT 230 kV ALTAMIRA /TRANSAMAZONIC C-1 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2044 1,431,782.81
  TRANSAMAZONIC MC 230 kV TR 230/34,5 kV TRANSAMAZONIC TF2 PA RBF FT TR 230/34,5 kV TRANSAMAZONIC TF2 PA 058/2001 IPCA RBNI REA 4660/2014 21/06/2016 20/06/2046 1,487,731.77
  TRANSAMAZONIC MG 230 kV TRANSAMAZONIC MG1 PA RB FT MG 230 kV TRANSAMAZONIC MG1 PA 058/2001 IPCA RBNI REA 4660/2014 29/08/2016 28/08/2047 3,017,693.48
  TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 4745/2014 22/02/2016 21/02/2041 4,172.23
  TUCURUI EL 500 kV TUCURUI LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 13,870.01
  TUCURUI EL 500 kV TUCURUI LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBNI REA 5861/2016 31/05/2019 30/05/2034 13,870.01
  TUCURUI IB 13,8 kV MG 500 kV TUCURUI MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,890.81
  TUCURUI IB 69 kV MG 500 kV TUCURUI MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 47,894.81
  TUCURUI EL 13,8 kV TUCURUI  DIST8 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  TUCURUI EL 13,8 kV TUCURUI  DIST7 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  TUCURUI EL 13,8 kV TUCURUI  DIST6 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  TUCURUI EL 13,8 kV TUCURUI  DIST5 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  TUCURUI EL 13,8 kV TUCURUI  DIST4 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  TUCURUI EL 13,8 kV TUCURUI  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  TUCURUI EL 13,8 kV TUCURUI  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  TUCURUI EL 13,8 kV TUCURUI  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,768.33
  TUCURUI MC 69 kV TR 500/69 kV TUCURUI TF1 PA RBF FT TR 500/69 kV TUCURUI TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 71,259.95
  TUCURUI EL 69 kV TUCURUI LT 69 kV US. TUCURUI /TUCURUI C-2 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  TUCURUI EL 69 kV TUCURUI LT 69 kV US. TUCURUI /TUCURUI C-1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  TUCURUI EL 69 kV TUCURUI  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 83,308.08
  TUCURUI EL 69 kV TUCURUI  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,493.13
  TUCURUI MC 138 kV TR 230/138 kV TUCURUI TR2 PA RBF FT TR 230/138 kV TUCURUI TR2 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 9/12/2041 136,339.23
  TUCURUI MC 138 kV TR 230/138 kV TUCURUI TR1 PA RBF FT TR 230/138 kV TUCURUI TR1 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 9/12/2041 136,339.23
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBNI REA 8314/2019 20/08/2021 19/08/2036 150,671.28
  TUCURUI EL 69 kV TUCURUI  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 162,175.84
  TUCURUI MC 230 kV TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 166,361.33
  TUCURUI MC 230 kV TR 230/138 kV TUCURUI TR2 PA RBF FT TR 230/138 kV TUCURUI TR2 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 9/12/2041 180,432.28
  TUCURUI MC 230 kV TR 230/138 kV TUCURUI TR1 PA RBF FT TR 230/138 kV TUCURUI TR1 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 9/12/2041 180,432.28
  TUCURUI MC 230 kV TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 184,703.31
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB6 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 3216/2011 22/02/2016 21/02/2046 187,064.49
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB4 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 3216/2011 22/02/2016 21/02/2046 187,064.49
  TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 8542/2020 18/04/2022 18/04/2057 204,378.29
  TUCURUI EL 230 kV TUCURUI LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 233,216.46
  TUCURUI EL 230 kV TUCURUI  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 233,216.46
  TUCURUI EL 230 kV TUCURUI LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 258,929.48
  TUCURUI EL 230 kV TUCURUI  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 258,929.48
  TUCURUI MC 500 kV RTB 500 kV 50 Mvar TUCURUI RT1 PA MC1 RB FT RTB 500 kV 50 Mvar TUCURUI RT1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 285,435.81
  TUCURUI MC 230 kV TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 323,855.57
  TUCURUI MG 230 kV TUCURUI MG1 PA RB FT MG 230 kV TUCURUI MG1 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 9/12/2041 345,686.61
  TUCURUI IB 138 kV MG 230 kV TUCURUI MG1 PA IB1 DIT   012/2011 IPCA RPEC CC 012/2011 26/12/2014 9/12/2041 360,070.37
  TUCURUI MC 69 kV TR 230/69 kV TUCURUI TF1 PA RBF FT TR 230/69 kV TUCURUI TF1 PA 058/2001 IPCA RBNI REA 3216/2011 9/2/2015 8/2/2046 404,255.42
  TUCURUI EL 230 kV TUCURUI LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 454,002.45
  TUCURUI TR 230/138 kV TUCURUI TR2 PA RBF FT TR 230/138 kV TUCURUI TR2 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 9/12/2041 459,415.15
  TUCURUI TR 230/138 kV TUCURUI TR1 PA RBF FT TR 230/138 kV TUCURUI TR1 PA 012/2011 IPCA RBL CC 012/2011 26/12/2014 9/12/2041 459,415.15
  TUCURUI MC 500 kV TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 471,137.52
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB9 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB7 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB6 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB5 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB4 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB3 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB2 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB1 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  TUCURUI MC 500 kV TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 523,082.26
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-9 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-8 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-7 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-6 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-5 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-4 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-3 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-2 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-11 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-10 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  TUCURUI EL 500 kV TUCURUI LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  TUCURUI EL 500 kV TUCURUI LT 500 kV MARABA /TUCURUI C-1 PA RB FT LT 500 kV MARABA /TUCURUI C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB6 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB5 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB4 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB3 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  TUCURUI RTB 500 kV 50 Mvar TUCURUI RT1 PA RB FT RTB 500 kV 50 Mvar TUCURUI RT1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 573,042.12
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-4 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-3 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-2 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-11 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-10 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  TUCURUI EL 500 kV TUCURUI LT 500 kV MARABA /TUCURUI C-2 PA RB FT LT 500 kV MARABA /TUCURUI C-2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 592,665.68
  TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 4745/2014 22/02/2016 21/02/2045 619,813.12
  TUCURUI MC 69 kV TR 230/69 kV TUCURUI TR2 PA RBF FT TR 230/69 kV TUCURUI TR2 PA 058/2001 IPCA RBNI REA 8542/2020 18/04/2022 18/04/2049 641,897.82
  TUCURUI TR 500/230 kV TUCURUI TRR1 PA RB FT TR 500/230 kV TUCURUI TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 642,678.04
  TUCURUI EL 138 kV TUCURUI  DIST1 DIT   012/2011 IPCA RPEC CC 012/2011 26/12/2014 9/12/2041 684,700.21

 

162 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 4745/2014 22/02/2016 21/02/2045 713,315.35
  TUCURUI TR 500/230 kV TUCURUI TRR1 PA RB FT TR 500/230 kV TUCURUI TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 713,535.79
  TUCURUI IB 230 kV MG 500 kV TUCURUI MG1 PA IB1 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 3216/2011 9/2/2015 8/2/2046 754,695.16
  TUCURUI MC 500 kV TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBNI REA 3216/2011 9/2/2015 8/2/2046 906,713.70
  TUCURUI MC 500 kV TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 917,163.33
  TUCURUI MC 230 kV TR 230/69 kV TUCURUI TF1 PA RBF FT TR 230/69 kV TUCURUI TF1 PA 058/2001 IPCA RBNI REA 3216/2011 9/2/2015 8/2/2046 950,206.36
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB6 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 973,306.35
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB5 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 973,306.35
  TUCURUI IB 500 kV MG 500 kV TUCURUI MG1 PA IB4 RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 973,306.35
  TUCURUI MC 230 kV TR 230/69 kV TUCURUI TR2 PA RBF FT TR 230/69 kV TUCURUI TR2 PA 058/2001 IPCA RBNI REA 8542/2020 18/04/2022 18/04/2050 973,893.90
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-11 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,039,169.68
  TUCURUI EL 500 kV TUCURUI LT 500 kV TUCURUI /US. TUCURUI C-10 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,039,169.68
  TUCURUI EL 230 kV TUCURUI  DIST1 DIT   058/2001 IPCA RCDM REA 3216/2011 24/05/2015 23/05/2045 1,067,312.09
  TUCURUI EL 230 kV TUCURUI LT 230 kV TUCURUI /ALTAMIRA C-1 PA RB FT LT 230 kV TUCURUI /ALTAMIRA C-1 PA 058/2001 IPCA RBNI REA 3216/2011 2/7/2015 1/7/2045 1,070,345.14
  TUCURUI MC 500 kV RTB 500 kV 50 Mvar TUCURUI RT1 PA MC2 RB FT RTB 500 kV 50 Mvar TUCURUI RT1 PA 058/2001 IPCA RBNI REA 4745/2014 22/02/2016 21/02/2048 1,143,269.70
  TUCURUI TR 500/230 kV TUCURUI TRR1 PA RB FT TR 500/230 kV TUCURUI TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,251,101.24
  TUCURUI MC 500 kV TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR2 PA 058/2001 IPCA RBNI REA 3216/2011 22/02/2016 21/02/2046 1,305,176.84
  TUCURUI TR 230/69 kV TUCURUI TF1 PA RBF FT TR 230/69 kV TUCURUI TF1 PA 058/2001 IPCA RBNI REA 3216/2011 9/2/2015 8/2/2049 1,350,456.24
  TUCURUI TR 230/69 kV TUCURUI TR2 PA RBF FT TR 230/69 kV TUCURUI TR2 PA 058/2001 IPCA RBNI REA 8542/2020 18/04/2022 18/04/2057 1,359,662.92
  TUCURUI TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,928,034.12
  TUCURUI TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,140,607.37
  TUCURUI MC 230 kV TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR2 PA 058/2001 IPCA RBNI REA 3216/2011 9/2/2015 8/2/2046 2,184,283.21
  TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,618,407.51
  TUCURUI MC 230 kV TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBNI REA 3216/2011 22/02/2016 21/02/2047 2,761,323.52
  TUCURUI TR 500/230 kV TUCURUI TR1 PA RB FT TR 500/230 kV TUCURUI TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,753,303.71
  TUCURUI TR 500/230 kV TUCURUI TR2 PA RB FT TR 500/230 kV TUCURUI TR2 PA 058/2001 IPCA RBNI REA 3216/2011 9/2/2015 8/2/2049 5,016,690.98
  TUCURUI MG 500 kV TUCURUI MG1 PA RB FT MG 500 kV TUCURUI MG1 PA 058/2001 IPCA RBNI REA 3216/2011 22/02/2016 21/02/2045 12,229,312.21
  TUCURUI VILA BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 33,806.48
  TUCURUI VILA BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 37,533.78
  TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR2 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,769.23
  TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,769.23
  TUCURUI VILA MC 13,8 kV TR 13,8/0,22 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 50,769.23
  TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR2 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 56,366.74
  TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 56,366.74
  TUCURUI VILA MC 13,8 kV TR 13,8/0,22 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 56,366.74
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,781.22
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,041.57
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,041.57
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 63,041.57
  TUCURUI VILA TR 69/13,8 kV TUCURUI VILA TR2 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 63,700.70
  TUCURUI VILA MC 69 kV TR 69/34,5 kV TUCURUI VILA TR3 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR2 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  TUCURUI VILA BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 65,811.08
  TUCURUI VILA MC 69 kV TR 69/34,5 kV TUCURUI VILA TR3 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 70,868.20
  TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR2 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 70,868.20
  TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 70,868.20
  TUCURUI VILA EL 69 kV TUCURUI VILA  DIST2 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,772.00
  TUCURUI VILA EL 34,5 kV TUCURUI VILA  DIST1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 78,772.00
  TUCURUI VILA MC 13,8 kV BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 82,107.21
  TUCURUI VILA EL 69 kV TUCURUI VILA  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 87,456.92
  TUCURUI VILA EL 34,5 kV TUCURUI VILA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 87,456.92
  TUCURUI VILA MC 13,8 kV BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 91,159.85
  TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR2 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 98,832.45
  TUCURUI VILA MC 13,8 kV TR 69/13,8 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 98,832.45
  TUCURUI VILA MC 13,8 kV TR 13,8/0,22 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 98,832.45
  TUCURUI VILA TR 69/13,8 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 108,473.91
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST3 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 110,535.98
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 110,535.98
  TUCURUI VILA EL 13,8 kV TUCURUI VILA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 110,535.98
  TUCURUI VILA MC 69 kV TR 69/34,5 kV TUCURUI VILA TR3 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 124,259.07
  TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR2 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 124,259.07
  TUCURUI VILA MC 69 kV TR 69/13,8 kV TUCURUI VILA TR1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 124,259.07
  TUCURUI VILA EL 69 kV TUCURUI VILA  DIST2 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 153,345.43
  TUCURUI VILA EL 34,5 kV TUCURUI VILA  DIST1 DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 153,345.43
  TUCURUI VILA TR 69/34,5 kV TUCURUI VILA TR3 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 156,383.44
  TUCURUI VILA MC 13,8 kV BC 13,8 kV 3 Mvar TUCURUI VILA BC1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 159,838.09
  TUCURUI VILA TR 69/34,5 kV TUCURUI VILA TR3 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 173,625.32
  TUCURUI VILA MG 69 kV TUCURUI VILA MG1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 265,187.53
  TUCURUI VILA MG 69 kV TUCURUI VILA MG1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 294,425.49
  TUCURUI VILA TR 69/34,5 kV TUCURUI VILA TR3 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 304,431.62
  TUCURUI VILA MG 69 kV TUCURUI VILA MG1 PA DIT   058/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 516,240.53
  UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBNI REA 2152/2009 19/11/2012 18/11/2040 1,304.09
  UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RMEL REN 443/2011 26/06/2017 25/06/2040 20,219.96
  UTINGA EL 230 kV UTINGA LT 230 kV MARITUBA /UTINGA C-1 PA RB FT LT 230 kV MARITUBA /UTINGA C-1 PA 058/2001 IPCA RMEL REN 443/2011 25/09/2017 24/09/2040 20,384.81
  UTINGA TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RMEL REN 443/2011 20/11/2016 19/11/2030 37,187.90
  UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RMEL REN 443/2011 18/12/2016 17/12/2030 37,214.24
  UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RMEL REA 2837/2011 24/02/2013 23/02/2047 54,130.34
  UTINGA TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RMEL REA 2837/2011 24/02/2013 23/02/2048 59,360.78
  UTINGA MC 69 kV TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  UTINGA MC 69 kV TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  UTINGA MC 69 kV TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  UTINGA MG 230 kV UTINGA MG1 PA RB FT MG 230 kV UTINGA MG1 PA 058/2001 IPCA RBNI REA 3362/2012 24/04/2015 23/04/2046 65,444.78
  UTINGA MC 69 kV TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 70,868.20

 

163 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  UTINGA MC 69 kV TR 230/69 kV UTINGA TF4 PA RBF FT TR 230/69 kV UTINGA TF4 PA 058/2001 IPCA RBNI REA 539/2006 21/02/2014 20/02/2043 86,854.01
  UTINGA MC 69 kV TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 124,259.07
  UTINGA IB 230 kV MG 230 kV UTINGA MG1 PA IB1 RB FT MG 230 kV UTINGA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  UTINGA MC 230 kV TR 230/69 kV UTINGA TF4 PA RBF FT TR 230/69 kV UTINGA TF4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  UTINGA MC 230 kV TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  UTINGA MC 230 kV TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  UTINGA MC 230 kV TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 184,099.08
  UTINGA MC 230 kV TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 204,396.72
  UTINGA MC 230 kV BC 230 kV 55 Mvar UTINGA BC4 PA RB FT BC 230 kV 55 Mvar UTINGA BC4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 205,385.16
  UTINGA MC 230 kV BC 230 kV 55 Mvar UTINGA BC3 PA RB FT BC 230 kV 55 Mvar UTINGA BC3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 205,385.16
  UTINGA MC 230 kV BC 230 kV 55 MVAr UTINGA BC2 PA RB FT BC 230 kV 55 MVAr UTINGA BC2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 205,385.16
  UTINGA MC 230 kV BC 230 kV 55 MVAr UTINGA BC1 PA RB FT BC 230 kV 55 MVAr UTINGA BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 205,385.16
  UTINGA BC 230 kV 55 Mvar UTINGA BC4 PA RB FT BC 230 kV 55 Mvar UTINGA BC4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 225,709.52
  UTINGA BC 230 kV 55 Mvar UTINGA BC3 PA RB FT BC 230 kV 55 Mvar UTINGA BC3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 225,709.52
  UTINGA BC 230 kV 55 MVAr UTINGA BC2 PA RB FT BC 230 kV 55 MVAr UTINGA BC2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 225,709.52
  UTINGA BC 230 kV 55 MVAr UTINGA BC1 PA RB FT BC 230 kV 55 MVAr UTINGA BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 225,709.52
  UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  UTINGA EL 230 kV UTINGA LT 230 kV MARITUBA /UTINGA C-2 PA RB FT LT 230 kV GUAMA /UTINGA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  UTINGA EL 230 kV UTINGA LT 230 kV MARITUBA /UTINGA C-1 PA RB FT LT 230 kV MARITUBA /UTINGA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 256,758.78
  UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 285,067.43
  UTINGA MC 230 kV TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 358,385.66
  UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /MIRAMAR C-1 PA RB FT LT 230 kV UTINGA /MIRAMAR C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 499,832.27
  UTINGA MG 230 kV UTINGA MG1 PA RB FT MG 230 kV UTINGA MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 669,170.88
  UTINGA TR 230/69 kV UTINGA TF4 PA RBF FT TR 230/69 kV UTINGA TF4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 687,629.85
  UTINGA TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 687,629.85
  UTINGA TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 687,629.85
  UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 687,629.85
  UTINGA TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 763,443.72
  UTINGA TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 763,443.72
  UTINGA TR 230/69 kV UTINGA TF1 PA RBF FT TR 230/69 kV UTINGA TF1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 763,443.72
  UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /CASTANHAL C-1 PA RB FT LT 230 kV UTINGA /CASTANHAL C-1 PA 058/2001 IPCA RBNI REA 3362/2012 24/04/2015 23/04/2046 970,737.83
  UTINGA EL 230 kV UTINGA LT 230 kV UTINGA /MIRAMAR C-2 PA RB FT LT 230 kV UTINGA /MIRAMAR C-2 PA 058/2001 IPCA RBNI REA 3362/2012 19/04/2016 18/04/2045 1,091,390.24
  UTINGA TR 230/69 kV UTINGA TF3 PA RBF FT TR 230/69 kV UTINGA TF3 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,338,608.93
  UTINGA TR 230/69 kV UTINGA TF2 PA RBF FT TR 230/69 kV UTINGA TF2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,338,608.93
  VARZEA GRANDE MC 230 kV RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 8/7/2016 7/7/2044 3,801.89
  VARZEA GRANDE RTN 69 kV 0 Mvar VARZEA GRANDE RTN1 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  VARZEA GRANDE MG 230 kV VARZEA GRANDE MG2 MT RB FT MG 230 kV VARZEA GRANDE MG2 MT 058/2001 IPCA RBNI REA 4967/2014 8/7/2016 7/7/2045 24,200.89
  VARZEA GRANDE MG 230 kV VARZEA GRANDE MG2 MT RB FT MG 230 kV VARZEA GRANDE MG2 MT 058/2001 IPCA RBNI REA 4967/2014 8/7/2016 7/7/2045 24,200.89
  VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 8/7/2016 7/7/2050 63,200.07
  VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 8/7/2016 7/7/2051 77,439.66
  VARZEA GRANDE MC 230 kV RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  VARZEA GRANDE MC 230 kV RTL 230 kV 30 Mvar VARZEA GRANDE RT1 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  VARZEA GRANDE MG 230 kV VARZEA GRANDE MG2 MT RB FT MG 230 kV VARZEA GRANDE MG2 MT 058/2001 IPCA RBNI REA 4967/2014 8/7/2016 7/7/2045 140,097.88
  VARZEA GRANDE MC 230 kV RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 8/7/2016 7/7/2044 315,264.14
  VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 411,079.54
  VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT1 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-1 MT 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 411,079.54
  VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 456,402.66
  VARZEA GRANDE MG 230 kV VARZEA GRANDE MG2 MT RB FT MG 230 kV VARZEA GRANDE MG2 MT 058/2001 IPCA RBNI REA 4967/2014 8/7/2016 7/7/2045 587,348.44
  VARZEA GRANDE RTL 230 kV 30 Mvar VARZEA GRANDE RT2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 800,248.48
  VARZEA GRANDE EL 230 kV VARZEA GRANDE LT 230 kV VARZEA GRANDE /COXIPO C-2 MT RB FT LT 230 kV VARZEA GRANDE /COXIPO C-2 MT 058/2001 IPCA RBNI REA 4967/2014 21/06/2016 20/06/2048 1,063,194.02
  VARZEA GRANDE EL 230 kV VARZEA GRANDE LT 230 kV JAURU /VARZEA GRANDE C-2 MT RB FT LT 230 kV JAURU /VARZEA GRANDE C-2 MT 058/2001 IPCA RBNI REA 4967/2014 8/7/2016 7/7/2048 1,064,555.79
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 6/4/2017 5/4/2047 14,223.13
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 6/4/2017 5/4/2047 14,223.13
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 6/4/2017 5/4/2047 14,223.13
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 6/4/2017 5/4/2047 14,223.13
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 6/4/2017 5/4/2047 14,223.13
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 6/4/2017 5/4/2047 14,223.13
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RMEL REN 443/2011 7/4/2017 6/4/2047 14,224.20
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RMEL REN 443/2011 7/4/2017 6/4/2047 14,224.20
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RMEL REN 443/2011 7/4/2017 6/4/2047 14,224.20
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RMEL REN 443/2011 7/6/2017 6/6/2047 14,289.10
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RMEL REN 443/2011 7/6/2017 6/6/2047 14,289.10
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RMEL REN 443/2011 7/6/2017 6/6/2047 14,289.10
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 17/07/2017 16/07/2047 14,331.67
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 17/07/2017 16/07/2047 14,331.67
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 17/07/2017 16/07/2047 14,331.67
  VILA DO CONDE EL 230 kV VILA DO CONDE LT 230 kV VILA DO CONDE /GUAMA C-2 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA 058/2001 IPCA RMEL REN 443/2011 6/3/2017 5/3/2040 20,017.06
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC1 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC1 PA 058/2001 IPCA RMEL REN 443/2011 18/08/2017 17/08/2040 20,315.99
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RMEL REN 443/2011 30/08/2017 29/08/2040 20,337.72
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC4 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC4 PA 058/2001 IPCA RMEL REN 443/2011 5/10/2017 4/10/2040 20,402.92
  VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RMEL REN 443/2011 22/05/2016 21/05/2030 23,613.92
  VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RMEL REN 443/2011 3/2/2017 2/2/2031 23,754.67
  VILA DO CONDE IB 13,8 kV MG 500 kV VILA DO CONDE MG1 PA IB1 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 28,397.78
  VILA DO CONDE RTL 500 kV 163 MVAr VILA DO CONDE RT1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RMEL REA 2837/2011 13/07/2013 12/7/2036 36,608.22
  VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RMEL REA 2837/2011 13/07/2013 12/7/2036 36,608.22
  VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR1 PA RB FT TR 500/230 kV VILA DO CONDE TR1 PA 058/2001 IPCA RMEL REA 2837/2011 13/07/2013 12/7/2036 36,608.22
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR3 PA RB FT TR 500/230 kV VILA DO CONDE TR3 PA 058/2001 IPCA RMEL REN 443/2011 15/06/2016 14/06/2030 36,613.23
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBNI REN 443/2011 3/10/2018 2/10/2049 40,858.79
  VILA DO CONDE MC 69 kV TR 230/69 kV VILA DO CONDE TF3 PA RBF FT TR 230/69 kV VILA DO CONDE TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  VILA DO CONDE MC 13,8 kV CS 150/-90 MVAr VILA DO CONDE CS2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,646.29
  VILA DO CONDE MC 13,8 kV CS 150/-90 MVAr VILA DO CONDE CS1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,646.29
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RMEL REN 443/2011 22/12/2017 21/12/2050 85,072.65
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB9 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB8 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB7 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB6 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22

 

164 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB5 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB4 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB3 DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB2 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB11 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB10 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB1 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  VILA DO CONDE MC 230 kV TR 500/230 kV VILA DO CONDE TR4 PA RB FT TR 500/230 kV VILA DO CONDE TR4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,288.67
  VILA DO CONDE MC 230 kV TR 500/230 kV VILA DO CONDE TR3 PA RB FT TR 500/230 kV VILA DO CONDE TR3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,288.67
  VILA DO CONDE MC 230 kV TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,288.67
  VILA DO CONDE MC 230 kV TR 500/230 kV VILA DO CONDE TR1 PA RB FT TR 500/230 kV VILA DO CONDE TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,288.67
  VILA DO CONDE MC 230 kV TR 230/69 kV VILA DO CONDE TR8 PA RBF FT TR 230/69 kV VILA DO CONDE TF6 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,288.67
  VILA DO CONDE MC 230 kV TR 230/69 kV VILA DO CONDE TF3 PA RBF FT TR 230/69 kV VILA DO CONDE TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,288.67
  VILA DO CONDE MC 230 kV TR 230/13,8 kV VILA DO CONDE TF2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,288.67
  VILA DO CONDE MC 230 kV TR 230/13,8 kV VILA DO CONDE TF1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,288.67
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB9 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 167,947.24
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB8 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 167,947.24
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB11 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 167,947.24
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB10 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 167,947.24
  VILA DO CONDE MC 230 kV BC 230 kV 111 MVAr VILA DO CONDE BC4 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 190,801.96
  VILA DO CONDE MC 230 kV BC 230 kV 111 MVAr VILA DO CONDE BC3 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 190,801.96
  VILA DO CONDE MC 230 kV BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 190,801.96
  VILA DO CONDE MC 230 kV BC 230 kV 111 MVAr VILA DO CONDE BC1 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 190,801.96
  VILA DO CONDE TR 230/69 kV VILA DO CONDE TF3 PA RBF FT TR 230/69 kV VILA DO CONDE TF3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 208,679.14
  VILA DO CONDE TR 230/69 kV VILA DO CONDE TF3 PA RBF FT TR 230/69 kV VILA DO CONDE TF3 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 231,686.83
  VILA DO CONDE EL 230 kV VILA DO CONDE LT 230 kV VILA DO CONDE /GUAMA C-2 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,776.23
  VILA DO CONDE EL 230 kV VILA DO CONDE LT 230 kV VILA DO CONDE /GUAMA C-1 PA RB FT LT 230 kV VILA DO CONDE /GUAMA C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,776.23
  VILA DO CONDE EL 230 kV VILA DO CONDE LT 230 kV ALBRAS /VILA DO CONDE C-2 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 241,776.23
  VILA DO CONDE EL 230 kV VILA DO CONDE LT 230 kV ALBRAS /VILA DO CONDE C-1 PA DIT   058/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 241,776.23
  VILA DO CONDE MC 13,8 kV TR 230/69 kV VILA DO CONDE TR7 PA RBF FT TR 230/69 kV VILA DO CONDE TR7 PA 058/2001 IPCA RBNI REA 4058/2013 1/12/2015 30/11/2038 267,495.69
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC4 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 290,659.55
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC3 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 290,659.55
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 290,659.55
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC1 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 290,659.55
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB9 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 294,475.76
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB8 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 294,475.76
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB11 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 294,475.76
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB10 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 294,475.76
  VILA DO CONDE RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA RB FT RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 301,104.07
  VILA DO CONDE IB 69 kV MG 500 kV VILA DO CONDE MG1 PA IB1 DIT   058/2001 IPCA RCDM REA 4058/2013 11/3/2016 10/3/2047 315,273.70
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC4 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC4 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,705.90
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC3 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC3 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,705.90
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,705.90
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC1 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 322,705.90
  VILA DO CONDE RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA RB FT RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 334,301.96
  VILA DO CONDE EL 69 kV VILA DO CONDE  CELPA C3 DIT   058/2001 IPCA RCDM REN 443/2011 3/10/2018 2/10/2046 356,773.62
  VILA DO CONDE MC 69 kV TR 230/69 kV VILA DO CONDE TR7 PA RBF FT TR 230/69 kV VILA DO CONDE TR7 PA 058/2001 IPCA RBNI REA 4058/2013 1/12/2015 30/11/2046 418,209.79
  VILA DO CONDE MC 69 kV TR 230/69 kV VILA DO CONDE TR8 PA RBF FT TR 230/69 kV VILA DO CONDE TR8 PA 058/2001 IPCA RBNI REA 4058/2013 1/12/2015 30/11/2044 419,857.18
  VILA DO CONDE EL 69 kV VILA DO CONDE  CELPA C1 DIT   058/2001 IPCA RCDM REA 4058/2013 21/06/2017 20/06/2047 434,379.89
  VILA DO CONDE EL 69 kV VILA DO CONDE  CELPA C2 DIT   058/2001 IPCA RCDM REA 4058/2013 21/06/2017 20/06/2047 435,080.59
  VILA DO CONDE MC 500 kV RTB 500 kV 165 Mvar VILA DO CONDE RT4 PA RB FT RTB 500 kV 165 Mvar VILA DO CONDE RT4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 441,123.86
  VILA DO CONDE MC 230 kV  DESMONTAGEM EQP RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBNI REA 4058/2013 11/3/2016 10/3/2045 442,787.76
  VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR4 PA RB FT TR 500/230 kV VILA DO CONDE TR4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 471,137.52
  VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR3 PA RB FT TR 500/230 kV VILA DO CONDE TR3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 471,137.52
  VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 471,137.52
  VILA DO CONDE MC 500 kV TR 500/230 kV VILA DO CONDE TR1 PA RB FT TR 500/230 kV VILA DO CONDE TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 471,137.52
  VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 483,366.68
  VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 483,366.68
  VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB4 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB3 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB2 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB1 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,977.62
  VILA DO CONDE EL 500 kV VILA DO CONDE LT 500 kV TUCURUI /VILA DO CONDE C-1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 533,810.94
  VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 536,659.74
  VILA DO CONDE TR 230/13,8 kV VILA DO CONDE TF1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 536,659.74
  VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB3 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,102.10
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC4 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC4 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 565,826.90
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC3 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC3 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 565,826.90
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC2 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 565,826.90
  VILA DO CONDE BC 230 kV 111 MVAr VILA DO CONDE BC1 PA RB FT BC 230 kV 111 MVAr VILA DO CONDE BC1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 565,826.90
  VILA DO CONDE RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA RB FT RTB 500 kV 54,42 MVAr VILA DO CONDE RTR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 586,159.24
  VILA DO CONDE MC 230 kV TR 230/69 kV VILA DO CONDE TR8 PA RBF FT TR 230/69 kV VILA DO CONDE TF6 PA 058/2001 IPCA RBNI REA 4058/2013 1/12/2015 30/11/2044 671,005.00
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TRR1 PA RB FT TR 500/230 kV VILA DO CONDE TRR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 757,806.48
  VILA DO CONDE MC 13,8 kV TR 230/69 kV VILA DO CONDE TR8 PA RBF FT TR 230/69 kV VILA DO CONDE TR8 PA 058/2001 IPCA RBNI REA 4058/2013 1/12/2015 30/11/2038 789,006.94
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TRR1 PA RB FT TR 500/230 kV VILA DO CONDE TRR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 841,357.59
  VILA DO CONDE RTL 500 kV 163 MVAr VILA DO CONDE RT1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 902,867.36
  VILA DO CONDE RTB 500 kV 165 Mvar VILA DO CONDE RT4 PA RB FT RTB 500 kV 165 Mvar VILA DO CONDE RT4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 906,271.12
  VILA DO CONDE MC 230 kV TR 230/69 kV VILA DO CONDE TR7 PA RBF FT TR 230/69 kV VILA DO CONDE TR7 PA 058/2001 IPCA RBNI REA 4058/2013 1/12/2015 30/11/2045 909,765.74
  VILA DO CONDE IB 500 kV MG 500 kV VILA DO CONDE MG1 PA IB3 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 973,306.35
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB14 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBNI REA 4058/2013 11/3/2016 10/3/2046 979,029.76
  VILA DO CONDE RTL 500 kV 163 MVAr VILA DO CONDE RT1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,002,412.00
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBNI REA 4058/2013 11/3/2016 10/3/2045 1,271,224.95
  VILA DO CONDE IB 230 kV MG 500 kV VILA DO CONDE MG1 PA IB6 RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBNI REA 4058/2013 11/3/2016 10/3/2046 1,474,597.83
  VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,747,929.80
  VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,747,929.80
  VILA DO CONDE RTL 500 kV 163 MVAr VILA DO CONDE RT1 PA RB FT LT 500 kV TUCURUI /VILA DO CONDE C-1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,757,611.75

 

165 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,940,645.86
  VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,940,645.86
  VILA DO CONDE TR 230/69 kV VILA DO CONDE TR8 PA RBF FT TR 230/69 kV VILA DO CONDE TR8 PA 058/2001 IPCA RBNI REA 4058/2013 1/12/2015 30/11/2049 1,952,428.44
  VILA DO CONDE TR 230/69 kV VILA DO CONDE TR7 PA RBF FT TR 230/69 kV VILA DO CONDE TR7 PA 058/2001 IPCA RBNI REA 4058/2013 1/12/2015 30/11/2049 1,952,428.44
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR4 PA RB FT TR 500/230 kV VILA DO CONDE TR4 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,273,419.43
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR3 PA RB FT TR 500/230 kV VILA DO CONDE TR3 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,273,419.43
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,273,419.43
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR1 PA RB FT TR 500/230 kV VILA DO CONDE TR1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,273,419.43
  VILA DO CONDE MG 500 kV VILA DO CONDE MG1 PA RB FT MG 500 kV VILA DO CONDE MG1 PA 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,306,691.66
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,524,072.76
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR1 PA RB FT TR 500/230 kV VILA DO CONDE TR1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,524,072.76
  VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS2 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,402,694.67
  VILA DO CONDE CS 150/-90 MVAr VILA DO CONDE CS1 PA RB FT CS 150/-90 MVAr VILA DO CONDE CS1 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,402,694.67
  VILA DO CONDE TR 500/230 kV VILA DO CONDE TR2 PA RB FT TR 500/230 kV VILA DO CONDE TR2 PA 058/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,425,665.25
  VILHENA MC 230 kV RTN 230 kV 0,1 Mvar VILHENA RN2 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,653.70
  VILHENA RTN 230 kV 0,1 Mvar VILHENA RN2 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,684.10
  VILHENA MC 69 kV TR 230/69 kV VILHENA TR2 RO RBF FT TR 230/69 kV VILHENA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  VILHENA MC 69 kV TR 230/69 kV VILHENA TR1 RO RBF FT TR 230/69 kV VILHENA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 63,830.63
  VILHENA MG 230 kV VILHENA MG3 RO RB FT MG 230 kV VILHENA MG3 RO 021/2009 IPCA RBNI REA 6171/2017 30/01/2019 30/01/2042 95,454.12
  VILHENA MC 230 kV RTL 230 kV 20 Mvar VILHENA RT2 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 104,412.77
  VILHENA BC 230 kV 18,5 Mvar VILHENA BC3 RO RB FT BC 230 kV 18,5 Mvar VILHENA BC3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,929.95
  VILHENA BC 230 kV 18,5 Mvar VILHENA BC2 RO RB FT BC 230 kV 18,5 Mvar VILHENA BC2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,929.95
  VILHENA BC 230 kV 18,5 Mvar VILHENA BC1 RO RB FT BC 230 kV 18,5 Mvar VILHENA BC1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,929.95
  VILHENA IB 230 kV MG 230 kV VILHENA MG1 RO IB1 RB FT MG 230 kV VILHENA MG1 RO 058/2001 IPCA RBNI REA 6171/2017 26/11/2018 26/11/2051 140,792.17
  VILHENA IB 230 kV MG 230 kV VILHENA MG1 RO IB1 RB FT MG 230 kV VILHENA MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,269.22
  VILHENA MC 230 kV RTB 230 kV 20 Mvar VILHENA RT1 RO RB FT RTB 230 kV 20 Mvar VILHENA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,992.04
  VILHENA MC 230 kV TR 230/69 kV VILHENA TR2 RO RBF FT TR 230/69 kV VILHENA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  VILHENA MC 230 kV TR 230/69 kV VILHENA TR1 RO RBF FT TR 230/69 kV VILHENA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,693.88
  VILHENA MC 230 kV BC 230 kV 18,5 Mvar VILHENA BC3 RO RB FT BC 230 kV 18,5 Mvar VILHENA BC3 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,950.59
  VILHENA MC 230 kV BC 230 kV 18,5 Mvar VILHENA BC2 RO RB FT BC 230 kV 18,5 Mvar VILHENA BC2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 174,950.59
  VILHENA MC 230 kV CE 100/-50 Mvar VILHENA CE1 RO RB FT CE 100/-50 Mvar VILHENA CE1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 177,880.74
  VILHENA MG 230 kV VILHENA MG3 RO RB FT MG 230 kV VILHENA MG3 RO 021/2009 IPCA RBNI REA 6171/2017 30/01/2019 30/01/2050 178,559.23
  VILHENA MC 230 kV BC 230 kV 18,5 Mvar VILHENA BC1 RO RB FT BC 230 kV 18,5 Mvar VILHENA BC1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 189,533.79
FURNAS      VILHENA MC 230 kV RTL 230 kV 0 Mvar VILHENA RT7 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 220,163.20
  VILHENA MC 230 kV RTL 230 kV 0 Mvar VILHENA RT6 RO RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 220,163.20
  VILHENA EL 230 kV VILHENA LT 230 kV VILHENA /JAURU C-3 RO/MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBNI REA 6171/2017 30/01/2019 30/01/2052 234,380.09
  VILHENA RTL 230 kV 20 Mvar VILHENA RT2 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 245,934.80
  VILHENA RTB 230 kV 20 Mvar VILHENA RT1 RO RB FT RTB 230 kV 20 Mvar VILHENA RT1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 245,934.80
  VILHENA EL 230 kV VILHENA LT 230 kV PIMENTA BUENO /VILHENA C-1 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,199.01
  VILHENA TR 230/69 kV VILHENA TR2 RO RBF FT TR 230/69 kV VILHENA TR2 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 312,702.63
  VILHENA TR 230/69 kV VILHENA TR1 RO RBF FT TR 230/69 kV VILHENA TR1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 312,702.63
  VILHENA MG 230 kV VILHENA MG1 RO RB FT MG 230 kV VILHENA MG1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 559,059.81
  VILHENA RTL 230 kV 0 Mvar VILHENA RT7 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 663,495.71
  VILHENA RTL 230 kV 0 Mvar VILHENA RT6 RO RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 669,190.53
  VILHENA EL 230 kV VILHENA LT 230 kV VILHENA /JAURU C-3 RO/MT RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 671,879.23
  VILHENA EL 230 kV VILHENA LT 230 kV PIMENTA BUENO /VILHENA C-3 RO RB FT LT 230 kV PIMENTA BUENO /VILHENA C-3 RO 021/2009 IPCA RBL CC 021/2009 20/05/2016 19/11/2039 671,879.23
  VILHENA MC 230 kV CR 230 kV 0 Mvar VILHENA BC6 RO RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBNI REA 6171/2017 30/01/2019 30/01/2041 708,397.15
  VILHENA CE 100/-50 Mvar VILHENA CE1 RO RB FT CE 100/-50 Mvar VILHENA CE1 RO 058/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,701,370.69
  VILHENA CR 230 kV 0 Mvar VILHENA BC6 RO RB FT LT 230 kV VILHENA /JAURU C-3 RO/MT 021/2009 IPCA RBNI REA 6171/2017 30/01/2019 30/01/2039 4,243,098.22
  ADRIANOPOLIS MG 500 kV ADRIANOPOLIS MG1 RJ RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 390.76
  ADRIANOPOLIS MG 500 kV ADRIANOPOLIS MG1 RJ RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RMEL REN 443/2011 5/10/2015 4/10/2028 8,732.00
  ADRIANOPOLIS MG 500 kV ADRIANOPOLIS MG1 RJ RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RMEL REN 443/2011 14/03/2016 13/03/2029 9,444.07
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR51 RJ 062/2001 IPCA RBNI REA 3578/2012 22/04/2019 21/04/2049 19,174.61
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 22/04/2019 21/04/2049 19,376.82
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR51 RJ 062/2001 IPCA RBNI REA 3578/2012 31/05/2019 30/05/2049 21,439.69
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 31/05/2019 30/05/2049 21,439.69
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 17/04/2020 16/04/2050 21,618.96
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2050 21,622.29
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2050 21,622.29
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2050 21,622.29
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2050 21,622.29
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2051 26,769.95
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 31,006.29
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 31,006.29
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 31,006.29
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 31,006.29
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 31,006.29
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 31,006.29
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /CEPEL C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 31,006.29
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /CEPEL C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2030 31,006.29
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 31,451.93
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 31,451.93
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 14/02/2016 13/02/2044 32,104.88
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 21/11/2015 20/11/2043 33,955.18
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 21/11/2015 20/11/2043 33,955.18
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 21/11/2015 20/11/2043 33,955.18
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2040 34,317.71
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2040 34,317.71
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2040 34,317.71
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1A RJ 062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2040 34,317.71
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 24/03/2014 23/03/2038 35,194.02
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 30/03/2014 29/03/2038 35,214.59
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 25/04/2014 24/04/2038 35,292.76
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RMEL REN 643/2014 17/05/2014 16/05/2038 35,356.77
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 23/05/2014 22/05/2038 35,377.21
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 8/8/2014 7/8/2038 35,603.55

 

166 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  ADRIANOPOLIS BC 13,8 kV 10 Mvar ADRIANOPOLIS BC9 RJ RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC9 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  ADRIANOPOLIS BC 13,8 kV 10 Mvar ADRIANOPOLIS BC8 RJ RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC8 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  ADRIANOPOLIS BC 13,8 kV 10 Mvar ADRIANOPOLIS BC7 RJ RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC7 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 45,582.51
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 6/5/2015 5/5/2042 45,601.82
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RMEL REN 643/2014 2/5/2016 1/5/2038 46,726.51
  ADRIANOPOLIS MC 13,8 kV RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT4 RJ RB FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT4 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  ADRIANOPOLIS MC 13,8 kV RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ RB FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2050 52,056.20
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 54,040.88
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 54,040.88
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 54,040.88
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 54,040.88
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 54,040.88
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 54,040.88
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 54,040.88
  ADRIANOPOLIS MC 13,8 kV BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ RBF FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  ADRIANOPOLIS MC 13,8 kV BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ RBF FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  ADRIANOPOLIS MC 13,8 kV BC 13,8 kV 10 Mvar ADRIANOPOLIS BC9 RJ RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC9 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  ADRIANOPOLIS MC 13,8 kV BC 13,8 kV 10 Mvar ADRIANOPOLIS BC8 RJ RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC8 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  ADRIANOPOLIS MC 13,8 kV BC 13,8 kV 10 Mvar ADRIANOPOLIS BC7 RJ RB FT BC 13,8 kV 10 Mvar ADRIANOPOLIS BC7 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 6/5/2015 5/5/2042 62,930.52
  ADRIANOPOLIS IB 138 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,442.16
  ADRIANOPOLIS IB 138 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 643/2014 27/04/2015 26/04/2040 68,635.39
  ADRIANOPOLIS MC 345 kV BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 70,362.73
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 73,053.48
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2050 73,053.48
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 73,433.92
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 78,260.30
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1A RJ 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 78,260.30
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  ADRIANOPOLIS MC 138 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP RB FT LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP 062/2001 IPCA RBNI DSP 1423/2021 24/06/2021 23/06/2051 98,556.59
  ADRIANOPOLIS MC 500 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI DSP 1423/2021 20/07/2021 19/07/2051 108,374.01
  ADRIANOPOLIS MC 500 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI DSP 1423/2021 21/07/2021 20/07/2051 108,377.69
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 30/04/2019 29/04/2052 115,187.23
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBNI DSP 1423/2021 7/6/2021 6/6/2051 116,985.61
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBNI DSP 1423/2021 7/6/2021 6/6/2051 116,985.61
  ADRIANOPOLIS IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBNI DSP 1423/2021 28/02/2022 27/02/2052 117,554.01
  ADRIANOPOLIS IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBNI DSP 1423/2021 28/02/2022 27/02/2052 117,554.01
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI REA 3578/2012 20/04/2020 19/04/2053 117,820.08
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /CEPEL C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  ADRIANOPOLIS EL 138 kV ADRIANOPOLIS LT 138 kV ADRIANOPOLIS /CEPEL C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP RB FT LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP 062/2001 IPCA RBNI DSP 1423/2021 23/06/2021 22/06/2051 132,727.33
  ADRIANOPOLIS BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ RBF FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC6 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 135,263.11
  ADRIANOPOLIS BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ RBF FT BC 13,8 kV 50 Mvar ADRIANOPOLIS BC5 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 135,263.11
  ADRIANOPOLIS RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT4 RJ RB FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT4 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,505.07
  ADRIANOPOLIS RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ RB FT RTB 13,8 kV 50 MVAr ADRIANOPOLIS RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,505.07
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2053 149,851.79
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2053 149,851.79
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 22/09/2020 21/09/2053 149,851.79
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2045 177,835.10
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBNI REA 3578/2012 6/5/2015 5/5/2045 177,909.17
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 3/5/2017 2/5/2049 186,153.20
  ADRIANOPOLIS MC 500 kV RTL 500 kV 136 MVAr ADRIANOPOLIS RT6 RJ RB FT RTL 500 kV 136 MVAr ADRIANOPOLIS RT6 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,061.65
  ADRIANOPOLIS IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB3 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBNI REA 3578/2012 3/5/2017 2/5/2049 195,706.23
  ADRIANOPOLIS IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB3 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  ADRIANOPOLIS IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  ADRIANOPOLIS IB 345 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB1 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  ADRIANOPOLIS MC 345 kV BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ 062/2001 IPCA RMEL REN 643/2014 12/1/2015 11/1/2045 197,050.07
  ADRIANOPOLIS MC 345 kV BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ 062/2001 IPCA RMEL REN 643/2014 19/01/2015 18/01/2045 197,158.26
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 21/11/2015 20/11/2045 202,401.91
  ADRIANOPOLIS MC 500 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBNI DSP 1423/2021 21/07/2021 20/07/2054 206,331.82
  ADRIANOPOLIS MC 345 kV BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  ADRIANOPOLIS MC 345 kV BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 24/06/2016 23/06/2046 216,273.08
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  ADRIANOPOLIS MC 345 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR51 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  ADRIANOPOLIS MC 345 kV TR 345/138 kV ADRIANOPOLIS TR1A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  ADRIANOPOLIS BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 233,211.82
  ADRIANOPOLIS BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC10 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 233,211.82
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TRR2 RJ RBF FT TR 345/138 kV ADRIANOPOLIS TRR2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 236,778.62
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TRR1 RJ RBF FT TR 345/138 kV ADRIANOPOLIS TRR1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 236,778.62
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16

 

167 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP RB FT LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP 062/2001 IPCA RBNI DSP 1423/2021 24/06/2021 23/06/2054 269,259.13
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBNI DSP 1423/2021 7/6/2021 6/6/2054 280,477.63
  ADRIANOPOLIS IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBNI DSP 1423/2021 28/02/2022 27/02/2055 281,743.45
  ADRIANOPOLIS MC 500 kV TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  ADRIANOPOLIS MC 500 kV TR 500/345 kV ADRIANOPOLIS TR53 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  ADRIANOPOLIS MC 500 kV TR 500/345 kV ADRIANOPOLIS TR51 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR51 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  ADRIANOPOLIS IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB3 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  ADRIANOPOLIS IB 500 kV MG 500 kV ADRIANOPOLIS MG1 RJ IB2 RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  ADRIANOPOLIS EL 500 kV ADRIANOPOLIS LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP RB FT LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  ADRIANOPOLIS BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ RB FT BC 345 kV 160 MVAr ADRIANOPOLIS BC11 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 555,614.42
  ADRIANOPOLIS RTL 500 kV 136 MVAr ADRIANOPOLIS RT6 RJ RB FT RTL 500 kV 136 MVAr ADRIANOPOLIS RT6 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 582,461.97
  ADRIANOPOLIS RTL 500 kV 136 MVAr ADRIANOPOLIS RT5 RJ RB FT RTL 500 kV 136 MVAr ADRIANOPOLIS RT5 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 582,461.97
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR1A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,335.86
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RMEL REA 8707/2020 17/05/2021 17/05/2055 856,715.46
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RMEL REA 8707/2020 11/12/2020 11/12/2054 856,715.46
  ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TRR1 RJ RB FT TR 500/345 kV ADRIANOPOLIS TRR1 RJ 062/2001 IPCA RMEL REA 8707/2020 9/10/2020 9/10/2055 1,196,032.67
  ADRIANOPOLIS EL 345 kV ADRIANOPOLIS LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,196,446.96
  ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TR55 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR55 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,488,086.24
  ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TR51 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR51 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,488,086.24
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RMEL REN 643/2014 17/10/2015 16/10/2048 1,830,296.14
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR1B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR1B RJ 062/2001 IPCA RMEL REN 643/2014 21/11/2015 20/11/2048 1,834,336.64
  ADRIANOPOLIS MG 500 kV ADRIANOPOLIS MG1 RJ RB FT MG 500 kV ADRIANOPOLIS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,179,571.12
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2B RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2B RJ 062/2001 IPCA RMEL REA 8707/2020 10/5/2022 10/5/2056 2,570,146.36
  ADRIANOPOLIS TR 345/138 kV ADRIANOPOLIS TR2A RJ RBF FT TR 345/138 kV ADRIANOPOLIS TR2A RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,257,900.22
  ADRIANOPOLIS TR 500/345 kV ADRIANOPOLIS TR53 RJ RB FT TR 500/345 kV ADRIANOPOLIS TR53 RJ 062/2001 IPCA RMEL REA 8707/2020 19/12/2020 19/12/2055 3,588,098.03
  AGUA VERMELHA MC 500 kV TR 500/440 kV AGUA VERMELHA TR8 SP RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RMEL REN 643/2014 8/5/2015 7/5/2045 1,581.05
  AGUA VERMELHA MC 440 kV TR 500/440 kV AGUA VERMELHA TR8 SP RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RMEL REN 643/2014 8/5/2015 7/5/2045 1,581.05
  AGUA VERMELHA IB 500 kV MG 500 kV AGUA VERMELHA MG2 SP IB5 RB FT MG 500 kV AGUA VERMELHA MG2 SP 062/2001 IPCA RMEL REN 643/2014 8/5/2015 7/5/2030 16,030.05
  AGUA VERMELHA IB 440 kV MG 500 kV AGUA VERMELHA MG1 SP IB5 RB FT MG 500 kV AGUA VERMELHA MG1 SP 062/2001 IPCA RMEL REN 643/2014 8/5/2015 7/5/2030 16,030.05
  AGUA VERMELHA MC 500 kV TR 500/440 kV AGUA VERMELHA TR8 SP RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBNI REA 7761/2019 3/4/2022 2/4/2037 18,712.27
  AGUA VERMELHA MC 440 kV TR 500/440 kV AGUA VERMELHA TR8 SP RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBNI REA 7761/2019 3/4/2022 2/4/2037 18,712.27
  AGUA VERMELHA MC 500 kV TR 500/440 kV AGUA VERMELHA TR8 SP RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBNI REA 7761/2019 3/4/2022 2/4/2037 293,158.89
  AGUA VERMELHA MC 440 kV TR 500/440 kV AGUA VERMELHA TR8 SP RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBNI REA 7761/2019 3/4/2022 2/4/2037 293,158.89
  AGUA VERMELHA MC 500 kV TR 500/440 kV AGUA VERMELHA TR8 SP RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  AGUA VERMELHA MC 440 kV TR 500/440 kV AGUA VERMELHA TR8 SP RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  AGUA VERMELHA IB 500 kV MG 500 kV AGUA VERMELHA MG2 SP IB5 RB FT MG 500 kV AGUA VERMELHA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  AGUA VERMELHA IB 440 kV MG 500 kV AGUA VERMELHA MG1 SP IB5 RB FT MG 500 kV AGUA VERMELHA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  AGUA VERMELHA TR 500/440 kV AGUA VERMELHA TRR1 SP RB FT TR 500/440 kV AGUA VERMELHA TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 543,391.34
  AGUA VERMELHA MG 500 kV AGUA VERMELHA MG2 SP RB FT MG 500 kV AGUA VERMELHA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 851,442.16
  AGUA VERMELHA TR 500/440 kV AGUA VERMELHA TR8 SP RB FT TR 500/440 kV AGUA VERMELHA TR8 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,630,174.03
  AGUAS LINDAS MG 230 kV AGUAS LINDAS MG2 GO RB FT MG 230 kV AGUAS LINDAS MG2 GO 062/2001 IPCA RBNI REA 5861/2016 28/11/2017 27/11/2045 0.01
  AGUAS LINDAS MG 230 kV AGUAS LINDAS MG2 GO RB FT MG 230 kV AGUAS LINDAS MG2 GO 062/2001 IPCA RBNI REA 2367/2010 26/11/2013 25/11/2036 653,661.55
  AGUAS LINDAS EL 230 kV AGUAS LINDAS LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2040 1,049,005.34
  AGUAS LINDAS EL 230 kV AGUAS LINDAS LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2040 1,049,005.34
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/1/2017 9/1/2041 179.55
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/1/2017 9/1/2041 179.55
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/1/2017 9/1/2041 179.55
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/1/2017 9/1/2041 179.55
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST1 DIT   062/2001 IPCA RMEL REN 443/2011 10/1/2017 9/1/2041 179.55
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST1 DIT   062/2001 IPCA RMEL REN 443/2011 10/1/2017 9/1/2041 179.55
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST1 DIT   062/2001 IPCA RMEL REN 443/2011 10/1/2017 9/1/2041 179.55
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RMEL REN 443/2011 18/01/2017 17/01/2041 179.69
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RMEL REN 443/2011 18/01/2017 17/01/2041 179.69
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST7 DIT   062/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2040 586.03
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST5 DIT   062/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2040 586.03
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2040 586.03
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST1 DIT   062/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2040 586.03
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 1,172.28
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/1/2017 9/1/2040 4,697.87
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/1/2017 9/1/2040 4,697.87
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/1/2017 9/1/2040 4,697.87
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RMEL REN 443/2011 26/01/2017 25/01/2040 4,704.80
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RMEL REN 443/2011 26/01/2017 25/01/2040 4,704.80
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RMEL REN 443/2011 26/01/2017 25/01/2040 4,704.80
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1B RJ DIT   062/2001 IPCA RMEL REN 643/2014 2/2/2016 1/2/2045 6,503.85
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST2 DIT   062/2001 IPCA RMEL REN 643/2014 14/06/2016 13/06/2045 6,571.87
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST6 DIT   062/2001 IPCA RMEL REN 643/2014 12/7/2016 11/7/2045 6,586.21
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST9 DIT   062/2001 IPCA RMEL REN 643/2014 27/09/2016 26/09/2045 6,625.58
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST11 DIT   062/2001 IPCA RMEL REN 643/2014 28/09/2016 27/09/2045 6,626.09
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST10 DIT   062/2001 IPCA RMEL REN 643/2014 4/10/2016 3/10/2045 6,629.16
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST12 DIT   062/2001 IPCA RMEL REN 643/2014 11/10/2016 10/10/2045 6,632.74
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029 8,495.34
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBNI REA 4347/2013 6/7/2015 5/7/2040 9,873.74
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBNI REA 5861/2016 10/2/2021 9/2/2036 12,047.92
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RBNI REA 5861/2016 10/2/2021 9/2/2036 12,047.92
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBNI REA 5861/2016 10/2/2021 9/2/2036 12,047.92

 

168 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1B RJ DIT   062/2001 IPCA RMEL REN 643/2014 2/6/2016 1/6/2038 13,862.22
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1D RJ DIT   062/2001 IPCA RMEL REN 643/2014 4/6/2016 3/6/2038 13,864.89
  ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB4 DIT   062/2001 IPCA RMEL REN 643/2014 31/05/2016 30/05/2038 13,867.97
  ANGRA FUR MC 138 kV TR 138/4,16 kV ANGRA FUR T1A2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 2/7/2016 1/7/2038 13,902.23
  ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB3 DIT   062/2001 IPCA RMEL REN 643/2014 14/07/2016 13/07/2038 13,909.69
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 14,399.43
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2040 15,992.46
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2040 15,992.46
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2040 15,992.46
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029 19,760.53
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1D RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 20,453.99
  ANGRA FUR TR 138/13,8 kV ANGRA FUR TR1D RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,003.61
  ANGRA FUR TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,003.61
  ANGRA FUR TR 138/13,8 kV ANGRA FUR TR1B RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,003.61
  ANGRA FUR TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,003.61
  ANGRA FUR BC 13,8 kV 5 Mvar ANGRA FUR BC2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,102.74
  ANGRA FUR BC 13,8 kV 3 Mvar ANGRA FUR BC1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 23,102.74
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBNI REA 8314/2019 11/2/2021 10/2/2036 33,934.40
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBNI REA 8314/2019 11/2/2021 10/2/2036 33,934.40
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBNI REA 8314/2019 11/2/2021 10/2/2036 33,934.40
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1B RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 37,654.76
  ANGRA FUR MC 13,8 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 37,654.76
  ANGRA FUR MC 138 kV TR 138/138 kV ANGRA FUR TRD1 RJ MC2 RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 40,580.12
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST9 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,844.59
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST8 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,844.59
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST7 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,844.59
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST6 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,844.59
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST5 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,844.59
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,844.59
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,844.59
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,844.59
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST12 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,844.59
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST11 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,844.59
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST10 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,844.59
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 40,844.59
  ANGRA FUR MC 138 kV TR 138/138 kV ANGRA FUR TRD1 RJ MC1 RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 44,116.81
  ANGRA FUR TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 52,422.39
  ANGRA FUR BC 13,8 kV 5 Mvar ANGRA FUR BC2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 55,041.01
  ANGRA FUR MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 2/12/2016 1/12/2045 56,808.39
  ANGRA FUR MC 13,8 kV BC 13,8 kV 5 Mvar ANGRA FUR BC2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,210.46
  ANGRA FUR MC 13,8 kV BC 13,8 kV 3 Mvar ANGRA FUR BC1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 59,210.46
  ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,442.16
  ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  ANGRA FUR IB 138 kV MG 500 kV ANGRA FUR MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  ANGRA FUR MC 138 kV BC 138 kV 25 Mvar ANGRA FUR BC1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 85,627.81
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1D RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1C RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1B RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR TR1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBNI REA 4089/2013 27/07/2018 27/07/2049 90,715.47
  ANGRA FUR MC 138 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  ANGRA FUR MC 138 kV TR 138/4,16 kV ANGRA FUR T1A2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR T2A3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST3 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 97,310.01
  ANGRA FUR BC 138 kV 25 Mvar ANGRA FUR BC1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 99,953.11
  ANGRA FUR BC 13,8 kV 5 Mvar ANGRA FUR BC2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 105,958.91
  ANGRA FUR EL 138 kV ANGRA FUR  MAMBUCABA-AMPLA DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  ANGRA FUR EL 13,8 kV ANGRA FUR  DIST3 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 187,330.56
  ANGRA FUR MC 500 kV RTL 500 kV 136 MVAr ANGRA FUR RT1 RJ RB FT RTL 500 kV 136 MVAr ANGRA FUR RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,061.65
  ANGRA FUR MC 138 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 224,165.84
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR T2A3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 224,165.84
  ANGRA FUR BC 138 kV 25 Mvar ANGRA FUR BC1A RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 238,132.81
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RMEL REN 643/2014 2/12/2016 1/12/2047 314,522.45
  ANGRA FUR MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  ANGRA FUR MC 500 kV TR 500/19 kV ANGRA FUR TRG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  ANGRA FUR MC 500 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  ANGRA FUR MC 138 kV TR 138/138 kV ANGRA FUR TRD2 RJ MC2 RBF FT TR 138/138 kV ANGRA FUR TRD2 RJ 062/2001 IPCA RBNI REA 4089/2013 27/07/2018 27/07/2039 336,092.71
  ANGRA FUR MC 138 kV TR 138/138 kV ANGRA FUR TRD2 RJ MC1 RBF FT TR 138/138 kV ANGRA FUR TRD2 RJ 062/2001 IPCA RBNI REA 4089/2013 27/07/2018 27/07/2039 336,092.71
  ANGRA FUR TR 138/138 kV ANGRA FUR TRD1 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 338,617.10
  ANGRA FUR IB 500 kV MG 500 kV ANGRA FUR MG1 RJ IB1 RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  ANGRA FUR MC 500 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBNI REA 7761/2019 27/03/2022 26/03/2037 351,733.78
  ANGRA FUR MC 138 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBNI REA 7761/2019 27/03/2022 26/03/2037 351,733.78
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  ANGRA FUR TR 500/138 kV ANGRA FUR TRR1 RJ RBF FT TR 500/138 kV ANGRA FUR TRR1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 400,263.98
  ANGRA FUR MC 138 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 431,539.47
  ANGRA FUR MC 138 kV TR 138/13,8 kV ANGRA FUR T2A3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 431,539.47
  ANGRA FUR RTL 500 kV 136 MVAr ANGRA FUR RT1 RJ RB FT RTL 500 kV 136 MVAr ANGRA FUR RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 582,461.97

 

169 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 630,256.63
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 630,256.63
  ANGRA FUR EL 138 kV ANGRA FUR LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 630,256.63
  ANGRA FUR MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  ANGRA FUR MC 500 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  ANGRA FUR EL 500 kV ANGRA FUR LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 869,108.22
  ANGRA FUR TR 500/138 kV ANGRA FUR TRR1 RJ RBF FT TR 500/138 kV ANGRA FUR TRR1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 953,607.05
  ANGRA FUR TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,201,887.65
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,467,878.86
  ANGRA FUR MC 500 kV TR 500/25 kV ANGRA FUR TRG2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,476,675.82
  ANGRA FUR MC 500 kV TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,476,675.82
  ANGRA FUR TR 500/138 kV ANGRA FUR TRR1 RJ RBF FT TR 500/138 kV ANGRA FUR TRR1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,835,779.63
  ANGRA FUR TR 138/138 kV ANGRA FUR TRD2 RJ RBF FT TR 138/138 kV ANGRA FUR TRD2 RJ 062/2001 IPCA RBNI REA 4089/2013 27/07/2018 27/07/2053 2,304,431.84
  ANGRA FUR TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,863,431.64
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,497,141.15
  ANGRA FUR TR 500/138 kV ANGRA FUR TR58 RJ RBF FT TR 500/138 kV ANGRA FUR TR58 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,512,364.31
  ANGRA FUR MG 500 kV ANGRA FUR MG1 RJ RB FT MG 500 kV ANGRA FUR MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,732,312.31
  ARARAQUARA FURNAS MG 500 kV ARARAQUARA FURNAS MG1 SP RB FT MG 500 kV ARARAQUARA FURNAS MG1 SP 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 781.52
  ARARAQUARA FURNAS MG 500 kV ARARAQUARA FURNAS MG1 SP RB FT MG 500 kV ARARAQUARA FURNAS MG1 SP 062/2001 IPCA RMEL REN 443/2011 13/07/2017 12/7/2031 9,381.04
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039 15,776.82
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039 15,776.82
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039 15,776.82
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039 15,776.82
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039 15,776.82
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2016 15/10/2039 15,776.82
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 7/11/2016 6/11/2039 15,799.41
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 7/11/2016 6/11/2039 15,799.41
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 7/11/2016 6/11/2039 15,799.41
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 7/11/2016 6/11/2039 15,799.41
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 7/11/2016 6/11/2039 15,799.41
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 7/11/2016 6/11/2039 15,799.41
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  ARARAQUARA FURNAS EL 500 kV ARARAQUARA FURNAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RTPC SP RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,829.87
  ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RTCA SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,829.87
  ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR2 SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,829.87
  ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR1 SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,829.87
  ARARAQUARA FURNAS MG 500 kV ARARAQUARA FURNAS MG1 SP RB FT MG 500 kV ARARAQUARA FURNAS MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 702,482.23
  ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR1 SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,107,431.77
  ARARAQUARA FURNAS RTL 500 kV 73,4 Mvar ARARAQUARA FURNAS RMR1 SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,131,906.10
  ATIBAIA 2 EL 345 kV ATIBAIA 2 LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4420/2013 10/9/2013 31/12/2042 836,739.21
  ATIBAIA 2 EL 345 kV ATIBAIA 2 LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 4420/2013 10/9/2013 31/12/2042 836,739.21
  B.DESPACHO 3 RTL 500 kV 33,33 Mvar B.DESPACHO 3 RTR3 MG RB FT RTL 500 kV 33,33 Mvar B.DESPACHO 3 RTR3 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039 219,437.45
  B.DESPACHO 3 MC 500 kV RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG RB FT RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039 507,616.69
  B.DESPACHO 3 EL 500 kV B.DESPACHO 3 LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG RB FT LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039 605,906.27
  B.DESPACHO 3 RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG RB FT RTL 500 kV 100 Mvar B.DESPACHO 3 RT21 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039 658,314.12
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2039 6,505.24
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RMEL REN 443/2011 12/11/2014 11/11/2035 7,310.46
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RMEL REN 443/2011 12/11/2014 11/11/2035 7,310.46
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RMEL REN 443/2011 12/11/2014 11/11/2035 7,310.46
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RMEL REN 443/2011 14/11/2014 13/11/2035 7,312.06
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RMEL REN 443/2011 14/11/2014 13/11/2035 7,312.06
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RMEL REN 443/2011 14/11/2014 13/11/2035 7,312.06
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035 7,316.03
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035 7,316.03
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035 7,316.03
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO 062/2001 IPCA RMEL REN 443/2011 20/11/2014 19/11/2035 7,316.82
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO 062/2001 IPCA RMEL REN 443/2011 20/11/2014 19/11/2035 7,316.82
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO 062/2001 IPCA RMEL REN 443/2011 20/11/2014 19/11/2035 7,316.82
  BANDEIRANTES MG 345 kV BANDEIRANTES MG1 GO RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2031 9,400.46
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RMEL REN 443/2011 5/5/2014 4/5/2034 10,526.64
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RMEL REN 443/2011 5/5/2014 4/5/2034 10,526.64
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RMEL REN 443/2011 5/5/2014 4/5/2034 10,526.64
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034 10,550.48
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034 10,550.48
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034 10,550.48
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR3 GO RB FT TR 345/230 kV BANDEIRANTES TR3 GO 062/2001 IPCA RMEL REN 643/2014 8/6/2015 7/6/2036 22,339.66
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RMEL REN 643/2014 26/08/2015 25/08/2036 22,497.26
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RBNI REA 2230/2009 6/4/2015 5/4/2032 22,812.41
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR3 GO RB FT TR 345/230 kV BANDEIRANTES TR3 GO 062/2001 IPCA RMEL REN 643/2014 8/6/2015 7/6/2036 32,764.31
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RMEL REN 643/2014 26/08/2015 25/08/2036 32,995.46
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR1 GO RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2052 66,658.37
  BANDEIRANTES IB 230 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2052 66,658.37
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2052 66,658.37
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2052 66,658.37
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RBNI REA 2230/2009 15/04/2019 15/04/2052 66,658.37
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR4 GO RB FT TR 345/230 kV BANDEIRANTES TR4 GO 062/2001 IPCA RBNI REA 2230/2009 6/4/2015 5/4/2042 70,891.91
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBNI REA 4347/2013 3/5/2017 2/5/2046 78,741.60
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBNI REA 4347/2013 3/5/2017 2/5/2046 78,741.60
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR1 GO RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RBNI REA 5861/2016 22/04/2019 21/04/2034 92,878.01
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR1 GO RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RBNI REA 5861/2016 22/04/2019 21/04/2034 98,802.63
  BANDEIRANTES IB 230 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,374.64
  BANDEIRANTES MC 345 kV RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,880.21
  BANDEIRANTES MC 345 kV RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,880.21

 

170 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR4 GO RB FT TR 345/230 kV BANDEIRANTES TR4 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR3 GO RB FT TR 345/230 kV BANDEIRANTES TR3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR1 GO RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  BANDEIRANTES RTB 13,8 kV 25 MVAr BANDEIRANTES RT4 GO RB FT RTB 13,8 kV 25 MVAr BANDEIRANTES RT4 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,322.24
  BANDEIRANTES RTB 13,8 kV 25 MVAr BANDEIRANTES RT3 GO RB FT RTB 13,8 kV 25 MVAr BANDEIRANTES RT3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,322.24
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TRR1 GO RB FT TR 10,5/345 kV BANDEIRANTES TRR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 142,773.50
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBNI REA 4347/2013 3/5/2017 2/5/2049 148,837.06
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBNI REA 4347/2013 3/5/2017 2/5/2049 148,837.06
  BANDEIRANTES MC 345 kV BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO RB FT BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO 062/2001 IPCA RMEL REN 643/2014 6/4/2013 5/4/2041 148,992.43
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBNI REA 2230/2009 6/4/2015 5/4/2042 155,550.61
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RBNI REA 2230/2009 6/4/2015 5/4/2042 161,471.35
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-2 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RMEL REN 643/2014 5/8/2015 4/8/2045 179,025.41
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RMEL REN 643/2014 26/08/2015 25/08/2045 179,309.79
  BANDEIRANTES BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO RB FT BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,925.60
  BANDEIRANTES IB 345 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  BANDEIRANTES MC 345 kV RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO 062/2001 IPCA RMEL REN 643/2014 17/03/2013 16/03/2041 201,071.83
  BANDEIRANTES MC 345 kV RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO 062/2001 IPCA RMEL REN 643/2014 24/03/2013 23/03/2041 201,195.03
  BANDEIRANTES MC 345 kV BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO RB FT BC 345 kV 91,5 MVAr BANDEIRANTES BC1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR4 GO RB FT TR 345/230 kV BANDEIRANTES TR4 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR3 GO RB FT TR 345/230 kV BANDEIRANTES TR3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR1 GO RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR7 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  BANDEIRANTES IB 230 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 246,284.42
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TRR1 GO RB FT TR 345/230 kV BANDEIRANTES TRR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 247,708.50
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  BANDEIRANTES EL 345 kV BANDEIRANTES LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 299,735.38
  BANDEIRANTES RTB 13,8 kV 25 MVAr BANDEIRANTES RT4 GO RB FT RTB 13,8 kV 25 MVAr BANDEIRANTES RT4 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 310,485.62
  BANDEIRANTES RTB 13,8 kV 25 MVAr BANDEIRANTES RT3 GO RB FT RTB 13,8 kV 25 MVAr BANDEIRANTES RT3 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 310,485.62
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TRR1 GO RB FT TR 10,5/345 kV BANDEIRANTES TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 340,150.07
  BANDEIRANTES RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,109.29
  BANDEIRANTES RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,109.29
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV XAVANTES /BANDEIRANTES C-1 GO RB FT LT 230 kV XAVANTES /BANDEIRANTES C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 418,034.07
  BANDEIRANTES EL 230 kV BANDEIRANTES LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO RB FT LT 230 kV BANDEIRANTES /ANHANGUERA GO C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 418,034.07
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR7 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,371.50
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 431,371.50
  BANDEIRANTES IB 345 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 469,392.83
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR3 GO RB FT TR 345/230 kV BANDEIRANTES TR3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 505,554.55
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR7 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TRR1 GO RB FT TR 345/230 kV BANDEIRANTES TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 590,151.95
  BANDEIRANTES MG 345 kV BANDEIRANTES MG1 GO RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBNI REA 4326/2013 1/6/2016 31/05/2045 612,298.15
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TRR1 GO RB FT TR 10,5/345 kV BANDEIRANTES TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 654,819.57
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR4 GO RB FT TR 345/230 kV BANDEIRANTES TR4 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 743,125.49
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 743,125.49
  BANDEIRANTES IB 345 kV MG 345 kV BANDEIRANTES MG1 GO IB1 RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 903,623.56
  BANDEIRANTES MG 345 kV BANDEIRANTES MG1 GO RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBNI REA 3468/2012 31/08/2012 30/08/2050 904,290.28
  BANDEIRANTES RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO RB FT RTL 345 kV 60 MVAr BANDEIRANTES RT1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 917,501.83
  BANDEIRANTES MG 345 kV BANDEIRANTES MG1 GO RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 990,390.17
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  BANDEIRANTES MC 345 kV TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR7 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,027,719.01
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,027,719.01
  BANDEIRANTES MC 230 kV TR 345/230 kV BANDEIRANTES TR5 GO RB FT TR 345/230 kV BANDEIRANTES TR5 GO 062/2001 IPCA RBNI REA 4326/2013 1/6/2016 31/05/2046 1,037,815.07
  BANDEIRANTES MC 345 kV TR 345/230 kV BANDEIRANTES TR5 GO RB FT TR 345/230 kV BANDEIRANTES TR5 GO 062/2001 IPCA RBNI REA 4326/2013 1/6/2016 31/05/2046 1,424,644.71
  BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE2 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,566,116.75
  BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE1 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,566,116.75
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,770,455.86
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR7 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,978,451.84
  BANDEIRANTES TR 10,5/345 kV BANDEIRANTES TR6 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,978,451.84
  BANDEIRANTES MG 345 kV BANDEIRANTES MG1 GO RB FT MG 345 kV BANDEIRANTES MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,359,550.45
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR1 GO RB FT TR 345/230 kV BANDEIRANTES TR1 GO 062/2001 IPCA RMEL REA 8707/2020 18/08/2020 18/08/2054 2,604,157.09
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR5 GO RB FT TR 345/230 kV BANDEIRANTES TR5 GO 062/2001 IPCA RBNI REA 4326/2013 1/6/2016 31/05/2048 3,294,866.77
  BANDEIRANTES TR 345/230 kV BANDEIRANTES TR2 GO RB FT TR 345/230 kV BANDEIRANTES TR2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,408,287.31
  BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE2 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,731,187.55
  BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE1 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,731,187.55
  BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE2 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,182,872.76
  BANDEIRANTES CE 100/-50 MvAr BANDEIRANTES CE1 GO RB FT CE 100/-50 MvAr BANDEIRANTES CE1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,182,872.76
  BARREIRO 1 MC 138 kV TR 345/138 kV BARREIRO 1 TR4 MG RBF FT TR 345/138 kV BARREIRO 1 TR4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  BARREIRO 1 MC 138 kV TR 345/138 kV BARREIRO 1 TR3 MG RBF FT TR 345/138 kV BARREIRO 1 TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  BARREIRO 1 TR 345/138 kV BARREIRO 1 TRR1 MG RBF FT TR 345/138 kV BARREIRO 1 TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,470.10
  BARREIRO 1 MC 345 kV TR 345/138 kV BARREIRO 1 TR4 MG RBF FT TR 345/138 kV BARREIRO 1 TR4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  BARREIRO 1 MC 345 kV TR 345/138 kV BARREIRO 1 TR3 MG RBF FT TR 345/138 kV BARREIRO 1 TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  BARREIRO 1 EL 345 kV BARREIRO 1 LT 345 kV BARREIRO 1 /PIMENTA C-1 MG RB FT LT 345 kV BARREIRO 1 /PIMENTA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  BARREIRO 1 TR 345/138 kV BARREIRO 1 TR4 MG RBF FT TR 345/138 kV BARREIRO 1 TR4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30
  BARREIRO 1 TR 345/138 kV BARREIRO 1 TR3 MG RBF FT TR 345/138 kV BARREIRO 1 TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30

 

171 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  BARRO ALTO IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 DIT   062/2001 IPCA RMEL REN 643/2014 24/05/2015 23/05/2042 12,230.48
  BARRO ALTO IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 DIT   062/2001 IPCA RMEL REN 643/2014 31/05/2015 30/05/2042 12,237.67
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RMEL REN 443/2011 8/12/2017 7/12/2032 13,543.00
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RMEL REN 443/2011 8/12/2017 7/12/2032 15,007.88
  BARRO ALTO EL 69 kV BARRO ALTO  DIST1 DIT   062/2001 IPCA RMEL REN 643/2014 20/09/2015 19/09/2042 15,904.36
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2037 26,582.05
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2036 27,251.08
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RMEL REN 643/2014 17/04/2016 16/04/2044 29,057.94
  BARRO ALTO IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RMEL REN 643/2014 1/11/2015 31/10/2043 30,955.65
  BARRO ALTO IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RMEL REN 643/2014 22/11/2015 21/11/2043 30,997.41
  BARRO ALTO IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 32,730.44
  BARRO ALTO EL 69 kV BARRO ALTO  DIST1 DIT   062/2001 IPCA RMEL REN 643/2014 20/09/2015 19/09/2042 32,922.02
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBNI REA 5861/2016 28/11/2017 27/11/2045 33,609.17
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBNI REA 3578/2012 6/5/2016 5/5/2044 38,551.20
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO RB FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO 062/2001 IPCA RBNI REA 3218/2011 1/2/2015 31/01/2040 41,172.00
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RMEL REN 643/2014 21/04/2016 20/04/2044 42,126.34
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO RB FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO 062/2001 IPCA RMEL REN 643/2014 29/05/2016 28/05/2044 42,236.86
  BARRO ALTO MC 13,8 kV CE 33/-22 Mvar BARRO ALTO CE1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,911.63
  BARRO ALTO EL 69 kV BARRO ALTO  DIST3 DIT   062/2001 IPCA RMEL REN 643/2014 4/10/2015 3/10/2043 48,865.05
  BARRO ALTO EL 69 kV BARRO ALTO  DIST2 DIT   062/2001 IPCA RMEL REN 643/2014 11/10/2015 10/10/2043 48,893.11
  BARRO ALTO MC 69 kV TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RMEL REN 643/2014 18/10/2015 17/10/2043 49,710.71
  BARRO ALTO MC 69 kV TR 230/69 kV BARRO ALTO TR2 GO RBF FT TR 230/69 kV BARRO ALTO TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,797.64
  BARRO ALTO MC 69 kV TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 51,797.64
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RMEL REN 643/2014 16/06/2016 15/06/2044 58,346.68
  BARRO ALTO EL 69 kV BARRO ALTO  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,031.11
  BARRO ALTO EL 69 kV BARRO ALTO  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,031.11
  BARRO ALTO EL 69 kV BARRO ALTO  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 60,031.11
  BARRO ALTO IB 69 kV MG 230 kV BARRO ALTO MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 77,978.48
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RMEL REN 643/2014 3/7/2016 2/7/2044 87,602.32
  BARRO ALTO IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,374.64
  BARRO ALTO BC 230 kV 27 Mvar BARRO ALTO BC1 GO RB FT BC 230 kV 27 Mvar BARRO ALTO BC1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 109,272.31
  BARRO ALTO BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO RB FT BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 110,890.20
  BARRO ALTO MC 13,8 kV CE 33/-22 Mvar BARRO ALTO CE1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 111,764.40
  BARRO ALTO MC 230 kV RTB 230 kV 15 Mvar BARRO ALTO RT1 GO RB FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO 062/2001 IPCA RMEL REN 643/2014 6/12/2015 5/12/2043 113,664.54
  BARRO ALTO MC 230 kV RTB 230 kV 15 Mvar BARRO ALTO RT1 GO RB FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 114,802.71
  BARRO ALTO MC 230 kV TR 230/13,8 kV BARRO ALTO TRC1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RMEL REN 643/2014 2/11/2014 1/11/2041 117,446.26
  BARRO ALTO MC 230 kV TR 230/69 kV BARRO ALTO TR2 GO RBF FT TR 230/69 kV BARRO ALTO TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,382.62
  BARRO ALTO MC 230 kV TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,382.62
  BARRO ALTO MC 230 kV TR 230/13,8 kV BARRO ALTO TRC1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,382.62
  BARRO ALTO MC 230 kV TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RMEL REN 643/2014 31/01/2016 30/01/2044 121,420.43
  BARRO ALTO MC 230 kV BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO RB FT BC 230 kV 27,7 Mvar BARRO ALTO BC2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,453.81
  BARRO ALTO MC 230 kV BC 230 kV 27 Mvar BARRO ALTO BC1 GO RB FT BC 230 kV 27 Mvar BARRO ALTO BC1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 122,453.81
  BARRO ALTO MC 69 kV TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 123,405.04
  BARRO ALTO TR 230/13,8 kV BARRO ALTO TRC1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 142,607.54
  BARRO ALTO EL 69 kV BARRO ALTO  DIST3 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 143,020.85
  BARRO ALTO EL 69 kV BARRO ALTO  DIST2 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 143,020.85
  BARRO ALTO EL 69 kV BARRO ALTO  DIST1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 143,020.85
  BARRO ALTO MC 230 kV RTB 230 kV 15 Mvar BARRO ALTO RT1 GO RB FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO 062/2001 IPCA RMEL REN 643/2014 27/06/2016 26/06/2047 159,586.50
  BARRO ALTO RTB 230 kV 15 Mvar BARRO ALTO RT1 GO RB FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 160,218.84
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO RB FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,614.70
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,614.70
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,614.70
  BARRO ALTO MC 13,8 kV CE 33/-22 Mvar BARRO ALTO CE1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 215,156.55
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBNI REA 4276/2013 22/11/2016 21/11/2045 225,449.87
  BARRO ALTO IB 230 kV MG 230 kV BARRO ALTO MG1 GO IB1 RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 246,284.42
  BARRO ALTO MC 230 kV TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 284,422.57
  BARRO ALTO MC 230 kV TR 230/13,8 kV BARRO ALTO TRC1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 284,422.57
  BARRO ALTO TR 230/69 kV BARRO ALTO TR2 GO RBF FT TR 230/69 kV BARRO ALTO TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 296,964.24
  BARRO ALTO TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 296,964.24
  BARRO ALTO TR 230/13,8 kV BARRO ALTO TRC1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 339,754.66
  BARRO ALTO RTB 230 kV 15 Mvar BARRO ALTO RT1 GO RB FT RTB 230 kV 15 Mvar BARRO ALTO RT1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 381,712.62
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO RB FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 404,097.74
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 404,097.74
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 404,097.74
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 428,774.89
  BARRO ALTO MC 69 kV TR 230/69 kV BARRO ALTO TR3 GO RBF FT TR 230/69 kV BARRO ALTO TR3 GO 062/2001 IPCA RBNI REA 4276/2013 22/11/2016 21/11/2046 470,415.20
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO 028/2009 IPCA RBL CC 028/2009 1/7/2016 19/11/2039 647,028.16
  BARRO ALTO TR 230/13,8 kV BARRO ALTO TRC1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 654,058.39
  BARRO ALTO CE 33/-22 Mvar BARRO ALTO CE1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 661,698.11
  BARRO ALTO TR 230/69 kV BARRO ALTO TR1 GO RBF FT TR 230/69 kV BARRO ALTO TR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 707,501.06
  BARRO ALTO EL 230 kV BARRO ALTO LT 230 kV ITAPACI /BARRO ALTO C-1 GO RB FT LT 230 kV ITAPACI /BARRO ALTO C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 777,924.62
  BARRO ALTO TR 230/69 kV BARRO ALTO TRR1 GO RBF FT TR 230/69 kV BARRO ALTO TRR1 GO 062/2001 IPCA RMEL REA 11449/2022 2/5/2022 2/9/2056 783,391.11
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,021,532.75
  BARRO ALTO MC 230 kV TR 230/69 kV BARRO ALTO TR3 GO RBF FT TR 230/69 kV BARRO ALTO TR3 GO 062/2001 IPCA RBNI REA 4276/2013 22/11/2016 21/11/2046 1,042,865.13
  BARRO ALTO TR 230/69 kV BARRO ALTO TR3 GO RBF FT TR 230/69 kV BARRO ALTO TR3 GO 062/2001 IPCA RBNI REA 4276/2013 22/11/2016 21/11/2048 1,309,470.43
  BARRO ALTO CE 33/-22 Mvar BARRO ALTO CE1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,576,459.57
  BARRO ALTO MG 230 kV BARRO ALTO MG1 GO RB FT MG 230 kV BARRO ALTO MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,966,542.74
  BARRO ALTO CE 33/-22 Mvar BARRO ALTO CE1 GO RB FT CE 33/-22 Mvar BARRO ALTO CE1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,034,826.94
  BARRO BRANCO MG 345 kV BARRO BRANCO MG1 MG RB FT MG 345 kV BARRO BRANCO MG1 MG 062/2001 IPCA RBNI REA 8920/2020 1/9/2017 30/04/2037 50,899.56
  BARRO BRANCO MG 345 kV BARRO BRANCO MG1 MG RB FT MG 345 kV BARRO BRANCO MG1 MG 062/2001 IPCA RBNI REA 8920/2020 1/9/2017 31/08/2048 101,970.84
  BARRO BRANCO EL 345 kV BARRO BRANCO LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG RB FT LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG 062/2001 IPCA RBNI REA 8920/2020 1/9/2017 31/08/2045 142,335.17
  BARRO BRANCO EL 345 kV BARRO BRANCO LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG RB FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG 062/2001 IPCA RBNI REA 8920/2020 1/9/2017 31/08/2045 142,335.17
  BARRO BRANCO IB 345 kV MG 345 kV BARRO BRANCO MG1 MG RB FT MG 345 kV BARRO BRANCO MG1 MG 062/2001 IPCA RBNI REA 8920/2020 1/9/2017 31/08/2049 154,592.23
  BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RMEL REN 443/2011 31/12/2017 30/12/2032 2,614.09
  BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-2 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBNI REA 5861/2016 10/2/2021 9/2/2036 16,177.38
  BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBNI REA 5861/2016 10/2/2021 9/2/2036 16,177.38

 

172 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-2 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBNI REA 8314/2019 10/2/2021 9/2/2036 27,829.04
  BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBNI REA 8314/2019 10/2/2021 9/2/2036 27,829.04
  BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-2 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBNI REA 8314/2019 11/2/2021 10/2/2036 34,267.86
  BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBNI REA 8314/2019 11/2/2021 10/2/2036 34,267.86
  BATEIAS IB 500 kV MG 500 kV BATEIAS MG5 PR IB7 RB FT MG 500 kV BATEIAS MG5 PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 2,840,153.68
  BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-2 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 2,840,153.68
  BATEIAS EL 500 kV BATEIAS LT 500 kV IBIUNA /BATEIAS C-1 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 2,840,153.68
  BATEIAS RTL 500 kV 165 Mvar BATEIAS RT4 PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 3,596,748.91
  BATEIAS RTL 500 kV 165 Mvar BATEIAS RT3 PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 3,596,748.91
  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR4 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR4 DF 062/2001 IPCA RBNI REA 2367/2010 29/11/2012 28/11/2031 19,630.25
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 7761/2019 20/09/2021 19/09/2036 34,451.19
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 7761/2019 27/10/2021 26/10/2036 34,513.68
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBNI REA 4068/2013 7/12/2017 6/12/2047 37,568.76
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TRR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TRR1 DF 062/2001 IPCA RBNI REA 3893/2013 30/07/2014 29/07/2033 40,055.10
  BRAS. GERAL MC 13,8 kV CS 20/-10 MVAr BRAS. GERAL CS1 DF RBF FT CS 20/-10 MVAr BRAS. GERAL CS1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,911.63
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 54,897.52
  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 112,955.27
  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR4 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 112,955.27
  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR2 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 112,955.27
  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 112,955.27
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 130,790.34
  BRAS. GERAL EL 230 kV BRAS. GERAL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,225.48
  BRAS. GERAL EL 230 kV BRAS. GERAL  LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,225.48
  BRAS. GERAL IB 34,50 kV MG 230 kV BRAS. GERAL MG1 DF IB4 DIT   062/2001 IPCA RCDM REA 5012/2015 23/12/2020 23/12/2052 174,687.85
  BRAS. GERAL IB 34,50 kV MG 230 kV BRAS. GERAL MG1 DF IB3 DIT   062/2001 IPCA RCDM REA 5012/2015 23/12/2020 23/12/2052 174,687.85
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBNI REA 5012/2015 27/01/2020 27/01/2043 199,081.78
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REN 643/2014 29/06/2013 28/06/2036 208,594.04
  BRAS. GERAL TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 213,695.30
  BRAS. GERAL TR 230/34,5 kV BRAS. GERAL TR2 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 213,695.30
  BRAS. GERAL TR 230/34,5 kV BRAS. GERAL TR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 213,695.30
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 3893/2013 30/07/2014 29/07/2040 219,441.90
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 251,783.21
  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 269,109.77
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR4 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR4 DF 062/2001 IPCA RBNI REA 5012/2015 21/02/2020 21/02/2043 308,212.74
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR3D DF DISPONIVEL RBF FT TR 230/34,5 kV BRAS. GERAL TR3D DF 062/2001 IPCA RBNI REA 5012/2015 21/02/2020 21/02/2043 308,212.74
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR2 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR2 DF 062/2001 IPCA RBNI REA 5012/2015 11/9/2020 11/9/2043 308,212.74
  BRAS. GERAL MC 34,5 kV TR 230/34,5 kV BRAS. GERAL TR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR1 DF 062/2001 IPCA RBNI REA 5012/2015 1/10/2020 1/10/2043 308,212.74
  BRAS. GERAL IB 34,50 kV MG 230 kV BRAS. GERAL MG1 DF IB2 DIT   062/2001 IPCA RCDM REA 5012/2015 23/12/2020 23/12/2049 323,050.85
  BRAS. GERAL IB 34,5 kV MG 230 kV BRAS. GERAL MG1 DF IB1 DIT   062/2001 IPCA RCDM REA 5012/2015 23/12/2020 23/12/2049 323,050.85
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST9 DIT   062/2001 IPCA RCDM REA 5012/2015 19/03/2020 19/03/2044 376,872.81
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST8 DIT   062/2001 IPCA RCDM REA 5012/2015 19/03/2020 19/03/2044 376,872.81
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST7 DIT   062/2001 IPCA RCDM REA 5012/2015 3/9/2020 3/9/2044 376,872.81
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST6 DIT   062/2001 IPCA RCDM REA 5012/2015 28/08/2020 28/08/2044 376,872.81
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST5 DIT   062/2001 IPCA RCDM REA 5012/2015 19/03/2020 19/03/2044 376,872.81
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST4 DIT   062/2001 IPCA RCDM REA 5012/2015 3/9/2020 3/9/2044 376,872.81
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST3 DIT   062/2001 IPCA RCDM REA 5012/2015 28/08/2020 28/08/2044 376,872.81
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST2 DIT   062/2001 IPCA RCDM REA 5012/2015 16/12/2020 16/12/2044 376,872.81
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST10 DIT   062/2001 IPCA RCDM REA 5012/2015 19/03/2020 19/03/2044 376,872.81
  BRAS. GERAL EL 34,5 kV BRAS. GERAL  DIST1 DIT   062/2001 IPCA RCDM REA 5012/2015 18/12/2020 18/12/2044 376,872.81
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 5012/2015 6/5/2021 6/5/2052 400,670.21
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 432,922.54
  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TR5 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR5 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 518,060.58
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 5012/2015 6/5/2021 6/5/2047 555,985.77
  BRAS. GERAL CS 20/-10 MVAr BRAS. GERAL CS2 DF RBF FT CS 20/-10 MVAr BRAS. GERAL CS2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 596,066.58
  BRAS. GERAL CS 20/-10 MVAr BRAS. GERAL CS1 DF RBF FT CS 20/-10 MVAr BRAS. GERAL CS1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 596,066.58
  BRAS. GERAL IB 230 kV MG 230 kV BRAS. GERAL MG1 DF IB2 RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBNI REA 2367/2010 6/3/2013 5/3/2040 672,747.59
  BRAS. GERAL MC 230 kV TR 230/34,5 kV BRAS. GERAL TRR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TRR1 DF 062/2001 IPCA RBNI REA 3893/2013 30/07/2014 29/07/2042 914,355.26
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,031,414.30
  BRAS. GERAL TR 230/34,5 kV BRAS. GERAL TRR1 DF RBF FT TR 230/34,5 kV BRAS. GERAL TRR1 DF 062/2001 IPCA RBNI REA 3231/2011 10/12/2013 9/12/2044 1,048,988.91
  BRAS. GERAL TR 230/34,5 kV BRAS. GERAL TR4 DF RBF FT TR 230/34,5 kV BRAS. GERAL TR4 DF 062/2001 IPCA RBNI REA 2367/2010 29/11/2012 28/11/2041 1,168,739.20
  BRAS. GERAL MG 230 kV BRAS. GERAL MG1 DF RB FT MG 230 kV BRAS. GERAL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,985,565.60
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF 062/2001 IPCA RBNI REA 4068/2013 7/11/2018 6/11/2032 256.99
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 4,035.89
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 2367/2010 12/9/2012 11/9/2031 5,938.82
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 4068/2013 24/10/2018 23/10/2048 10,625.01
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 4068/2013 24/10/2018 23/10/2048 10,625.01
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 4068/2013 24/10/2018 23/10/2048 10,625.01
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 4068/2013 24/10/2018 23/10/2048 10,625.01
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 4068/2013 24/10/2018 23/10/2048 10,625.01
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048 10,880.20
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048 10,880.20
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048 10,880.20
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048 10,880.20
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048 10,880.20
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 4347/2013 22/03/2019 21/03/2034 11,032.90
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 4347/2013 22/03/2019 21/03/2034 11,032.90
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBNI REA 4347/2013 22/03/2019 21/03/2034 11,032.90
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBNI REA 4347/2013 22/03/2019 21/03/2034 11,032.90
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RMEL REN 443/2011 1/12/2017 30/11/2032 11,492.56
  BRAS. SUL EL 138 kV BRAS. SUL  DIST3 DIT   062/2001 IPCA RCDM REA 7761/2019 4/4/2021 3/4/2036 13,355.88
  BRAS. SUL EL 138 kV BRAS. SUL  DIST4 DIT   062/2001 IPCA RMEL REN 443/2011 10/4/2017 9/4/2046 22,855.65
  BRAS. SUL EL 138 kV BRAS. SUL  DIST4 DIT   062/2001 IPCA RMEL REN 443/2011 10/4/2017 9/4/2046 22,855.65
  BRAS. SUL EL 138 kV BRAS. SUL  DIST2 DIT   062/2001 IPCA RMEL REN 443/2011 3/5/2017 2/5/2046 22,885.21
  BRAS. SUL EL 138 kV BRAS. SUL  DIST2 DIT   062/2001 IPCA RMEL REN 443/2011 3/5/2017 2/5/2046 22,885.21
  BRAS. SUL EL 138 kV BRAS. SUL  DIST5 DIT   062/2001 IPCA RMEL REN 443/2011 24/05/2017 23/05/2046 22,921.13
  BRAS. SUL EL 138 kV BRAS. SUL  DIST5 DIT   062/2001 IPCA RMEL REN 443/2011 24/05/2017 23/05/2046 22,921.13

 

173 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  BRAS. SUL EL 138 kV BRAS. SUL  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 26/07/2017 25/07/2046 23,008.48
  BRAS. SUL EL 138 kV BRAS. SUL  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 26/07/2017 25/07/2046 23,008.48
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RMEL REN 443/2011 21/02/2017 20/02/2046 23,742.51
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RMEL REN 443/2011 21/02/2017 20/02/2046 23,742.51
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RMEL REN 443/2011 21/02/2017 20/02/2046 23,742.51
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RMEL REN 443/2011 5/4/2017 4/4/2046 23,799.28
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RMEL REN 443/2011 5/4/2017 4/4/2046 23,799.28
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RMEL REN 443/2011 5/4/2017 4/4/2046 23,799.28
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RMEL REN 443/2011 5/4/2017 4/4/2046 23,799.28
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RMEL REN 443/2011 5/4/2017 4/4/2046 23,799.28
  BRAS. SUL EL 138 kV BRAS. SUL  DIST4 DIT   062/2001 IPCA RCDM REA 4068/2013 25/04/2017 24/04/2046 24,614.97
  BRAS. SUL EL 138 kV BRAS. SUL  DIST4 DIT   062/2001 IPCA RCDM REA 4068/2013 25/04/2017 24/04/2046 24,614.97
  BRAS. SUL EL 138 kV BRAS. SUL  DIST2 DIT   062/2001 IPCA RCDM REA 4068/2013 3/5/2017 2/5/2046 24,619.10
  BRAS. SUL EL 138 kV BRAS. SUL  DIST2 DIT   062/2001 IPCA RCDM REA 4068/2013 3/5/2017 2/5/2046 24,619.10
  BRAS. SUL EL 138 kV BRAS. SUL  DIST5 DIT   062/2001 IPCA RCDM REA 4068/2013 24/05/2017 23/05/2046 24,657.75
  BRAS. SUL EL 138 kV BRAS. SUL  DIST5 DIT   062/2001 IPCA RCDM REA 4068/2013 24/05/2017 23/05/2046 24,657.75
  BRAS. SUL EL 138 kV BRAS. SUL  DIST3 DIT   062/2001 IPCA RCDM REA 4068/2013 7/8/2017 6/8/2046 24,762.71
  BRAS. SUL EL 138 kV BRAS. SUL  DIST3 DIT   062/2001 IPCA RCDM REA 4068/2013 7/8/2017 6/8/2046 24,762.71
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBNI REA 4068/2013 17/03/2017 16/03/2046 25,423.30
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBNI REA 4068/2013 17/03/2017 16/03/2046 25,423.30
  BRAS. SUL IB 138 kV MG 345 kV BRAS. SUL MG1 DF IB1 DIT   062/2001 IPCA RCDM REA 4068/2013 21/11/2017 20/11/2047 26,027.93
  BRAS. SUL IB 138 kV MG 345 kV BRAS. SUL MG1 DF IB1 DIT   062/2001 IPCA RCDM REA 4068/2013 21/11/2017 20/11/2047 26,027.93
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBNI REA 4068/2013 9/11/2018 8/11/2048 28,919.09
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048 28,982.98
  BRAS. SUL EL 138 kV BRAS. SUL  DIST9 DIT   062/2001 IPCA RCDM REA 4068/2013 24/10/2018 23/10/2048 30,921.31
  BRAS. SUL EL 138 kV BRAS. SUL  DIST4 DIT   062/2001 IPCA RMEL REN 443/2011 10/4/2017 9/4/2046 33,124.13
  BRAS. SUL EL 138 kV BRAS. SUL  DIST2 DIT   062/2001 IPCA RMEL REN 443/2011 3/5/2017 2/5/2046 33,166.96
  BRAS. SUL EL 138 kV BRAS. SUL  DIST5 DIT   062/2001 IPCA RMEL REN 443/2011 24/05/2017 23/05/2046 33,219.03
  BRAS. SUL EL 138 kV BRAS. SUL  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 26/07/2017 25/07/2046 33,345.63
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 7761/2019 4/4/2021 3/4/2036 33,949.31
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBNI REA 7761/2019 4/4/2021 3/4/2036 33,949.31
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBNI REA 4068/2013 1/3/2018 29/02/2048 35,801.64
  BRAS. SUL EL 138 kV BRAS. SUL  DIST1 DIT   062/2001 IPCA RCDM REA 7761/2019 4/4/2021 3/4/2036 40,582.12
  BRAS. SUL EL 138 kV BRAS. SUL  DIST2 DIT   062/2001 IPCA RCDM REA 7761/2019 4/4/2021 3/4/2036 40,988.55
  BRAS. SUL EL 138 kV BRAS. SUL  DIST5 DIT   062/2001 IPCA RCDM REA 7761/2019 4/4/2021 3/4/2036 46,026.81
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBNI REA 4068/2013 9/11/2018 8/11/2048 46,713.30
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 4068/2013 19/12/2018 18/12/2048 46,816.50
  BRAS. SUL EL 138 kV BRAS. SUL  DIST6 DIT   062/2001 IPCA RCDM REA 4068/2013 22/12/2016 21/12/2045 47,602.14
  BRAS. SUL EL 138 kV BRAS. SUL  DIST4 DIT   062/2001 IPCA RCDM REA 7761/2019 4/4/2021 3/4/2036 47,631.38
  BRAS. SUL EL 138 kV BRAS. SUL  DIST7 DIT   062/2001 IPCA RCDM REA 4068/2013 17/03/2017 16/03/2046 47,849.53
  BRAS. SUL EL 138 kV BRAS. SUL  DIST2 DIT   062/2001 IPCA RCDM REA 4068/2013 3/5/2017 2/5/2046 47,972.01
  BRAS. SUL EL 138 kV BRAS. SUL  DIST1 DIT   062/2001 IPCA RCDM REA 4068/2013 21/08/2017 20/08/2046 48,301.65
  BRAS. SUL MC 13,8 kV RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  BRAS. SUL MC 13,8 kV RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBNI REA 4068/2013 17/03/2017 16/03/2046 50,166.62
  BRAS. SUL MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  BRAS. SUL MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  BRAS. SUL MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  BRAS. SUL MC 13,8 kV BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2036 59,951.72
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF 062/2001 IPCA RBNI REA 4068/2013 6/4/2015 5/4/2045 61,658.62
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBNI REA 4068/2013 4/1/2018 3/1/2048 66,082.35
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR9 DF RB FT TR 345/230 kV BRAS. SUL TR9 DF 062/2001 IPCA RBNI REA 4068/2013 8/1/2018 7/1/2048 66,101.41
  BRAS. SUL BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,580.36
  BRAS. SUL BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,580.36
  BRAS. SUL BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,580.36
  BRAS. SUL BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF RBF FT BC 13,8 kV 15 Mvar BRAS. SUL BC1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 66,580.36
  BRAS. SUL IB 138 kV MG 345 kV BRAS. SUL MG1 DF IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBNI REA 4068/2013 4/1/2018 3/1/2048 85,136.23
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 7761/2019 4/4/2021 3/4/2036 87,362.48
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBNI REA 7761/2019 4/4/2021 3/4/2036 87,362.48
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBNI REA 7761/2019 18/02/2017 17/02/2032 88,089.23
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF 062/2001 IPCA RBNI REA 4068/2013 7/11/2018 6/11/2048 88,129.65
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 4068/2013 7/11/2018 6/11/2048 88,129.65
  BRAS. SUL IB 230 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 5484/2015 22/04/2019 21/04/2049 88,879.49
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031 89,438.27
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034 92,230.69
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBNI REA 7761/2019 18/02/2017 17/02/2032 92,746.19
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034 93,207.74
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034 97,106.59
  BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034 99,153.38
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034 99,153.38
  BRAS. SUL IB 230 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,374.64
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031 103,901.13
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2043 109,839.02
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034 123,648.06
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR3 DF RB FT TR 345/230 kV BRAS. SUL TR3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  BRAS. SUL EL 138 kV BRAS. SUL  DIST9 DIT   062/2001 IPCA RCDM REA 7761/2019 7/4/2021 6/4/2036 127,518.74
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031 127,860.07

 

174 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  BRAS. SUL RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,322.24
  BRAS. SUL RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,322.24
  BRAS. SUL EL 138 kV BRAS. SUL  DIST9 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  BRAS. SUL EL 138 kV BRAS. SUL  DIST7 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  BRAS. SUL EL 138 kV BRAS. SUL  DIST6 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  BRAS. SUL EL 138 kV BRAS. SUL  DIST5 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  BRAS. SUL EL 138 kV BRAS. SUL  DIST4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  BRAS. SUL EL 138 kV BRAS. SUL  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  BRAS. SUL EL 138 kV BRAS. SUL  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  BRAS. SUL EL 138 kV BRAS. SUL  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  BRAS. SUL EL 138 kV BRAS. SUL  DIST6 DIT   062/2001 IPCA RCDM REA 7761/2019 4/4/2021 3/4/2036 137,872.42
  BRAS. SUL EL 138 kV BRAS. SUL  DIST7 DIT   062/2001 IPCA RCDM REA 7761/2019 4/4/2021 3/4/2036 160,845.48
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO RB FT LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR9 DF RB FT TR 345/230 kV BRAS. SUL TR9 DF 062/2001 IPCA RBNI REA 2367/2010 12/9/2012 11/9/2038 187,501.00
  BRAS. SUL TR 345/138 kV BRAS. SUL TRR1 DF RBF FT TR 345/138 kV BRAS. SUL TRR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,470.10
  BRAS. SUL IB 345 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR3 DF RB FT TR 345/230 kV BRAS. SUL TR3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 224,165.84
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 224,165.84
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 224,165.84
  BRAS. SUL TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBNI REA 2367/2010 27/09/2012 26/09/2032 226,676.37
  BRAS. SUL TR 345/230 kV BRAS. SUL TRR2 DF RB FT TR 345/230 kV BRAS. SUL TRR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 247,708.50
  BRAS. SUL TR 13,8/345 kV BRAS. SUL TR1 DF RB FT CS 60/-30 MVAr BRAS. SUL CS1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,120.03
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 299,735.38
  BRAS. SUL RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 310,485.62
  BRAS. SUL RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF RBF FT RTB 13,8 kV 25 Mvar BRAS. SUL RT1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 310,485.62
  BRAS. SUL EL 138 kV BRAS. SUL  DIST9 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  BRAS. SUL EL 138 kV BRAS. SUL  DIST7 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  BRAS. SUL RTL 345 kV 60 Mvar BRAS. SUL RT3 DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,109.29
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 431,539.47
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 431,539.47
  BRAS. SUL IB 345 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 469,392.83
  BRAS. SUL IB 345 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 4068/2013 30/08/2015 29/08/2046 492,988.32
  BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 5861/2016 28/07/2021 27/07/2036 575,445.11
  BRAS. SUL TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30
  BRAS. SUL TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30
  BRAS. SUL TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30
  BRAS. SUL TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30
  BRAS. SUL TR 345/138 kV BRAS. SUL TR2 DF RBF FT TR 345/138 kV BRAS. SUL TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30
  BRAS. SUL TR 345/138 kV BRAS. SUL TR1 DF RBF FT TR 345/138 kV BRAS. SUL TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30
  BRAS. SUL TR 345/230 kV BRAS. SUL TRR2 DF RB FT TR 345/230 kV BRAS. SUL TRR2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 590,151.95
  BRAS. SUL TR 13,8/345 kV BRAS. SUL TR1 DF RB FT CS 60/-30 MVAr BRAS. SUL CS1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 595,897.31
  BRAS. SUL MC 138 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBNI REA 2367/2010 27/09/2012 26/09/2045 596,127.31
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBNI REA 2367/2010 27/09/2012 26/09/2040 653,957.93
  BRAS. SUL MC 230 kV TR 345/230 kV BRAS. SUL TR10 DF RB FT TR 345/230 kV BRAS. SUL TR10 DF 062/2001 IPCA RBNI REA 3814/2012 2/9/2014 1/9/2043 663,320.35
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBNI REA 3814/2012 2/9/2014 1/9/2039 668,298.71
  BRAS. SUL TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 743,125.49
  BRAS. SUL TR 345/230 kV BRAS. SUL TR3 DF RB FT TR 345/230 kV BRAS. SUL TR3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 743,125.49
  BRAS. SUL CS 60/-30 MVAr BRAS. SUL CS1 DF RB FT CS 60/-30 MVAr BRAS. SUL CS1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 761,152.63
  BRAS. SUL IB 345 kV MG 345 kV BRAS. SUL MG1 DF IB1 RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 903,623.56
  BRAS. SUL RTL 345 kV 60 Mvar BRAS. SUL RT3 DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 917,501.83
  BRAS. SUL TR 345/138 kV BRAS. SUL TRR2 DF RBF FT TR 345/138 kV BRAS. SUL TRR2 DF 062/2001 IPCA RBNI REA 3814/2012 30/09/2015 29/09/2046 922,202.11
  BRAS. SUL EL 230 kV BRAS. SUL LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF 062/2001 IPCA RBNI REA 3814/2012 22/04/2014 21/04/2042 999,442.46
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  BRAS. SUL MC 345 kV TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  BRAS. SUL TR 13,8/345 kV BRAS. SUL TR1 DF RB FT CS 60/-30 MVAr BRAS. SUL CS1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,147,156.10
  BRAS. SUL EL 345 kV BRAS. SUL LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,196,446.96
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,218,264.10
  BRAS. SUL TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,382,795.83
  BRAS. SUL TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,382,795.83
  BRAS. SUL TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,382,795.83
  BRAS. SUL TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,382,795.83
  BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR10 DF RB FT TR 345/230 kV BRAS. SUL TR10 DF 062/2001 IPCA RBNI REA 3814/2012 2/9/2014 1/9/2042 1,453,511.19
  BRAS. SUL RTL 345 kV 60 Mvar BRAS. SUL RT3 DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,766,273.82
  BRAS. SUL TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,770,455.86
  BRAS. SUL TR 345/230 kV BRAS. SUL TR3 DF RB FT TR 345/230 kV BRAS. SUL TR3 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,770,455.86
  BRAS. SUL MC 345 kV TR 345/230 kV BRAS. SUL TR9 DF RB FT TR 345/230 kV BRAS. SUL TR9 DF 062/2001 IPCA RBNI REA 2367/2010 12/9/2012 11/9/2039 1,822,047.90

 

175 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  BRAS. SUL TR 345/138 kV BRAS. SUL TR8B DF RBF FT TR 345/138 kV BRAS. SUL TR8B DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,662,006.76
  BRAS. SUL TR 345/138 kV BRAS. SUL TR8A DF RBF FT TR 345/138 kV BRAS. SUL TR8A DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,662,006.76
  BRAS. SUL TR 345/138 kV BRAS. SUL TR7 DF RBF FT TR 345/138 kV BRAS. SUL TR7 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,662,006.76
  BRAS. SUL TR 345/138 kV BRAS. SUL TR4 DF RBF FT TR 345/138 kV BRAS. SUL TR4 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,662,006.76
  BRAS. SUL TR 345/230 kV BRAS. SUL TR9 DF RB FT TR 345/230 kV BRAS. SUL TR9 DF 062/2001 IPCA RBNI REA 2367/2010 12/9/2012 11/9/2041 2,715,979.05
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,902,447.63
  BRAS. SUL TR 345/230 kV BRAS. SUL TR10 DF RB FT TR 345/230 kV BRAS. SUL TR10 DF 062/2001 IPCA RBNI REA 3814/2012 2/9/2014 1/9/2044 3,137,840.92
  BRAS. SUL TR 345/230 kV BRAS. SUL TR6 DF RB FT TR 345/230 kV BRAS. SUL TR6 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,408,287.31
  BRAS. SUL MG 345 kV BRAS. SUL MG1 DF RB FT MG 345 kV BRAS. SUL MG1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,587,473.62
  C. DOURADA EL 230 kV C. DOURADA LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2038 22,789.60
  C. DOURADA EL 230 kV C. DOURADA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RMEL REN 443/2011 30/01/2016 29/01/2038 22,789.60
  C. DOURADA MC 138 kV TR  230/138  kV C. DOURADA     TR2 GO RBF FT TR  230/138  kV C. DOURADA     TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  C. DOURADA MC 230 kV TR  230/138  kV C. DOURADA     TR2 GO RBF FT TR  230/138  kV C. DOURADA     TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 119,382.62
  C. DOURADA EL 230 kV C. DOURADA LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RMEL REN 643/2014 22/01/2016 21/01/2047 147,469.86
  C. DOURADA EL 230 kV C. DOURADA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RMEL REN 643/2014 30/01/2016 29/01/2047 147,556.93
  C. DOURADA TR 230/138 kV C. DOURADA TRR2 GO RBF FT TR 230/138 kV C. DOURADA TRR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 151,242.94
  C. DOURADA EL 230 kV C. DOURADA LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,614.70
  C. DOURADA EL 230 kV C. DOURADA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,614.70
  C. DOURADA MC 138 kV TR  230/138  kV C. DOURADA     TR2 GO RBF FT TR  230/138  kV C. DOURADA     TR2 GO 062/2001 IPCA RMELP REA 7846/2019     205,869.73
  C. DOURADA MC 230 kV TR  230/138  kV C. DOURADA     TR2 GO RBF FT TR  230/138  kV C. DOURADA     TR2 GO 062/2001 IPCA RMELP REA 7846/2019     313,087.54
  C. DOURADA TR 230/138 kV C. DOURADA TRR2 GO RBF FT TR 230/138 kV C. DOURADA TRR2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 360,328.03
  C. DOURADA TR  230/138  kV C. DOURADA     TR2 GO RBF FT TR  230/138  kV C. DOURADA     TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 453,728.81
  C. DOURADA TR 230/138 kV C. DOURADA TRR2 GO RBF FT TR 230/138 kV C. DOURADA TRR2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 693,663.97
  C. DOURADA TR 230/138 kV C. DOURADA TRR2 GO RBF FT TR 230/138 kV C. DOURADA TRR2 GO 062/2001 IPCA RMELP REA 7846/2019     725,472.06
  C. DOURADA TR  230/138  kV C. DOURADA     TR2 GO RBF FT TR  230/138  kV C. DOURADA     TR2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,080,984.09
  C. DOURADA TR  230/138  kV C. DOURADA     TR2 GO RBF FT TR  230/138  kV C. DOURADA     TR2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,080,991.92
  C. DOURADA TR  230/138  kV C. DOURADA     TR2 GO RBF FT TR  230/138  kV C. DOURADA     TR2 GO 062/2001 IPCA RMELP REA 7846/2019     2,176,416.15
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 781.52
  C. PAULISTA TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RMEL REN 643/2014 20/02/2016 19/02/2045 6,513.05
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBNI REA 4347/2013 25/04/2017 24/04/2032 8,875.44
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 4347/2013 24/11/2017 23/11/2032 9,059.50
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029 9,453.83
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/2/2021 10/2/2036 10,737.53
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/2/2021 10/2/2036 10,737.53
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/2/2021 10/2/2036 10,737.53
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/2/2021 10/2/2036 10,737.53
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/2/2021 10/2/2036 10,737.53
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/2/2021 10/2/2036 10,737.53
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/2/2021 10/2/2036 10,737.53
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 11/2/2021 10/2/2036 10,737.53
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBNI REA 5861/2016 10/2/2021 9/2/2036 12,047.92
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBNI REA 5861/2016 10/2/2021 9/2/2036 12,047.92
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBNI REA 5861/2016 10/2/2021 9/2/2036 12,047.92
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ RB FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ 062/2001 IPCA RBNI REA 5861/2016 10/2/2021 9/2/2036 12,047.92
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG RB FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG 062/2001 IPCA RBNI REA 5861/2016 10/2/2021 9/2/2036 12,047.92
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBNI REA 5861/2016 10/2/2021 9/2/2036 12,047.92
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBNI REA 5861/2016 10/2/2021 9/2/2036 12,047.92
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP RB FT LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP 062/2001 IPCA RBNI REA 5861/2016 10/2/2021 9/2/2036 12,047.92
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBNI REA 2040/2009 30/09/2012 29/09/2026 17,785.34
  C. PAULISTA EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ DIT   062/2001 IPCA RMEL REN 643/2014 29/11/2015 28/11/2043 21,676.47
  C. PAULISTA EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ DIT   062/2001 IPCA RMEL REN 643/2014 5/12/2015 4/12/2043 21,679.06
  C. PAULISTA IB 138 kV MG 500 kV C. PAULISTA MG1 SP IB1 DIT   062/2001 IPCA RMEL REN 443/2011 22/11/2015 21/11/2045 22,266.43
  C. PAULISTA IB 138 kV MG 500 kV C. PAULISTA MG1 SP IB1 DIT   062/2001 IPCA RMEL REN 643/2014 8/11/2015 7/11/2043 22,769.07
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029 31,025.71
  C. PAULISTA MC 500 kV TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RMEL REN 643/2014 9/5/2015 8/5/2036 45,379.69
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 643/2014 6/11/2015 5/11/2037 46,075.28
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG RB FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG 062/2001 IPCA RMEL REN 643/2014 1/11/2015 31/10/2037 46,078.40
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RMEL REN 643/2014 17/11/2015 16/11/2037 46,126.16
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RMEL REN 643/2014 15/01/2016 14/01/2038 46,344.58
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RMEL REN 443/2011 15/12/2016 14/12/2039 47,535.99
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RMEL REN 443/2011 28/03/2017 27/03/2040 47,895.47
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RMEL REN 443/2011 28/03/2017 27/03/2046 66,955.13
  C. PAULISTA IB 138 kV MG 500 kV C. PAULISTA MG1 SP IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  C. PAULISTA MC 138 kV TR 500/138 kV C. PAULISTA TR59 SP RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  C. PAULISTA MC 138 kV TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  C. PAULISTA EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  C. PAULISTA EL 138 kV C. PAULISTA LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  C. PAULISTA MC 500 kV RTL 500 kV 136 MVAr C. PAULISTA RT2 SP RB FT RTL 500 kV 136 MVAr C. PAULISTA RT2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,061.65
  C. PAULISTA MC 500 kV RTB 500 kV 136 Mvar C. PAULISTA RT1 SP RB FT RTB 500 kV 136 Mvar C. PAULISTA RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 275,792.96
  C. PAULISTA MC 500 kV TR 500/138 kV C. PAULISTA TR59 SP RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  C. PAULISTA MC 500 kV TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  C. PAULISTA TR 500/138 kV C. PAULISTA TRR1 SP RBF FT TR 500/138 kV C. PAULISTA TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 331,465.03
  C. PAULISTA IB 500 kV MG 500 kV C. PAULISTA MG1 SP IB3 RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  C. PAULISTA IB 500 kV MG 500 kV C. PAULISTA MG1 SP IB2 RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  C. PAULISTA IB 500 kV MG 500 kV C. PAULISTA MG1 SP IB1 RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ RB FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG RB FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP RB FT LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  C. PAULISTA RTL 500 kV 136 MVAr C. PAULISTA RT2 SP RB FT RTL 500 kV 136 MVAr C. PAULISTA RT2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 582,461.97
  C. PAULISTA RTB 500 kV 136 Mvar C. PAULISTA RT1 SP RB FT RTB 500 kV 136 Mvar C. PAULISTA RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 582,461.97
  C. PAULISTA MC 500 kV TR 500/138 kV C. PAULISTA TR59 SP RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 767,068.36

 

176 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

  C. PAULISTA TR 500/138 kV C. PAULISTA TRR1 SP RBF FT TR 500/138 kV C. PAULISTA TRR1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 789,697.31
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 869,108.22
  C. PAULISTA EL 500 kV C. PAULISTA LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 869,108.22
  C. PAULISTA TR 500/138 kV C. PAULISTA TR59 SP RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 996,149.54
  C. PAULISTA TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 996,149.54
  C. PAULISTA MG 500 kV C. PAULISTA MG1 SP RB FT MG 500 kV C. PAULISTA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,457,934.75
  C. PAULISTA TR 500/138 kV C. PAULISTA TRR1 SP RBF FT TR 500/138 kV C. PAULISTA TRR1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,520,238.59
  C. PAULISTA TR 500/138 kV C. PAULISTA TR59 SP RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,373,271.84
  C. PAULISTA TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,373,271.84
  C. PAULISTA TR 500/138 kV C. PAULISTA TR59 SP RBF FT TR 500/138 kV C. PAULISTA TR59 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,568,762.46
  C. PAULISTA TR 500/138 kV C. PAULISTA TR57 SP RBF FT TR 500/138 kV C. PAULISTA TR57 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,568,762.46
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP DIT   062/2001 IPCA RMEL REN 443/2011 7/8/2015 6/8/2036 4,511.33
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP DIT   062/2001 IPCA RMEL REN 443/2011 7/8/2015 6/8/2036 4,511.33
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP DIT   062/2001 IPCA RMEL REN 443/2011 7/8/2015 6/8/2036 4,511.33
  CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBNI REA 4347/2013 31/10/2017 30/10/2032 9,038.61
  CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBNI REA 5484/2015 18/12/2018 17/12/2032 15,336.35
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048 18,917.51
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048 18,917.51
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048 18,917.51
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048 18,917.51
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RMEL REN 643/2014 26/02/2014 25/02/2030 19,186.32
  CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBNI REA 4347/2013 31/10/2017 30/10/2045 20,922.56
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048 27,416.69
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2038 28,490.73
  CAMPINAS MC 345 kV TR 500/345 kV CAMPINAS TR51 SP RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RMEL REN 643/2014 8/7/2015 7/7/2036 32,170.12
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR2 SP RBF FT TR 345/138 kV CAMPINAS TR2 SP 062/2001 IPCA RMEL REN 643/2014 7/8/2015 6/8/2036 32,251.64
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR1 SP RBF FT TR 345/138 kV CAMPINAS TR1 SP 062/2001 IPCA RMEL REN 643/2014 14/09/2015 13/09/2036 32,358.86
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-1 SP DIT   062/2001 IPCA RMEL REN 643/2014 14/09/2015 13/09/2036 32,358.86
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 643/2014 11/1/2016 10/1/2038 32,672.75
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RMEL REN 643/2014 20/03/2016 19/03/2038 32,856.74
  CAMPINAS MC 500 kV TR 500/345 kV CAMPINAS TR51 SP RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RMEL REN 643/2014 8/7/2015 7/7/2036 45,613.54
  CAMPINAS EL 500 kV CAMPINAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 643/2014 25/10/2015 24/10/2037 46,045.90
  CAMPINAS EL 500 kV CAMPINAS LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 643/2014 17/11/2015 16/11/2037 46,126.16
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 20/08/2018 19/08/2048 46,504.35
  CAMPINAS MC 13,8 kV RTB 13,8 kV 50 MVAr CAMPINAS RT5 SP RB FT RTB 13,8 kV 50 MVAr CAMPINAS RT5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  CAMPINAS MC 13,8 kV RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP RB FT RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  CAMPINAS MC 13,8 kV RTB 13,8 kV 25 MVAr CAMPINAS RT2 SP RBF FT RTB 13,8 kV 25 MVAr CAMPINAS RT2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  CAMPINAS MC 13,8 kV RTB 13,8 kV 25 MVAr CAMPINAS RT1 SP RBF FT RTB 13,8 kV 25 MVAr CAMPINAS RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 643/2014 1/6/2014 31/05/2030 54,489.00
  CAMPINAS EL 500 kV CAMPINAS LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 643/2014 9/5/2014 8/5/2030 76,416.07
  CAMPINAS MC 138 kV TR 345/138 kV CAMPINAS TR5 SP RBF FT TR 345/138 kV CAMPINAS TR5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 79,943.87
  CAMPINAS MC 138 kV TR 345/138 kV CAMPINAS TR4 SP RBF FT TR 345/138 kV CAMPINAS TR4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 79,943.87
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-4 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,482.83
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-3 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,482.83
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-2 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,482.83
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-1 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,482.83
  CAMPINAS RTB 13,8 kV 25 MVAr CAMPINAS RT2 SP RBF FT RTB 13,8 kV 25 MVAr CAMPINAS RT2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,322.24
  CAMPINAS RTB 13,8 kV 25 MVAr CAMPINAS RT1 SP RBF FT RTB 13,8 kV 25 MVAr CAMPINAS RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,322.24
  CAMPINAS RTB 13,8 kV 50 MVAr CAMPINAS RT5 SP RB FT RTB 13,8 kV 50 MVAr CAMPINAS RT5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,505.07
  CAMPINAS RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP RB FT RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,505.07
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 22/03/2015 21/03/2045 183,721.04
  CAMPINAS TR 345/138 kV CAMPINAS TRR1 SP RBF FT TR 345/138 kV CAMPINAS TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,470.10
  CAMPINAS RTB 500 kV 45,3 MVAr CAMPINAS RTR1 SP RB FT RTB 500 kV 45,3 MVAr CAMPINAS RTR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 194,107.22
  CAMPINAS MC 500 kV RTL 500 kV 136 MVAr CAMPINAS RTC2 SP RB FT RTL 500 kV 136 MVAr CAMPINAS RTC2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,061.65
  CAMPINAS IB 345 kV MG 500 kV CAMPINAS MG1 SP IB1 RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  CAMPINAS IB 345 kV MG 500 kV CAMPINAS MG1 SP IB1 RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RMEL REN 643/2014 2/12/2014 1/12/2044 208,145.88
  CAMPINAS EL 138 kV CAMPINAS LT 138 kV TANQUINHO /CAMPINAS C-3 SP DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 215,570.40
  CAMPINAS MC 345 kV TR 500/345 kV CAMPINAS TR54 SP RB FT TR 500/345 kV CAMPINAS TR54 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  CAMPINAS MC 345 kV TR 500/345 kV CAMPINAS TR51 SP RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR5 SP RBF FT TR 345/138 kV CAMPINAS TR5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR4 SP RBF FT TR 345/138 kV CAMPINAS TR4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR2 SP RBF FT TR 345/138 kV CAMPINAS TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR1 SP RBF FT TR 345/138 kV CAMPINAS TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  CAMPINAS MC 345 kV TR 500/345 kV CAMPINAS TR51 SP RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RMEL REN 643/2014 6/7/2015 5/7/2045 237,791.76
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR2 SP RBF FT TR 345/138 kV CAMPINAS TR2 SP 062/2001 IPCA RMEL REN 643/2014 7/8/2015 6/8/2045 238,301.11
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR1 SP RBF FT TR 345/138 kV CAMPINAS TR1 SP 062/2001 IPCA RMEL REN 643/2014 14/09/2015 13/09/2045 238,915.58
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2048 290,618.01
  CAMPINAS MC 500 kV TR 500/345 kV CAMPINAS TR54 SP RB FT TR 500/345 kV CAMPINAS TR54 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  CAMPINAS MC 500 kV TR 500/345 kV CAMPINAS TR51 SP RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  CAMPINAS RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP RB FT RTB 13,8 kV 50 MVAr CAMPINAS RT4 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,275.42
  CAMPINAS EL 500 kV CAMPINAS LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  CAMPINAS EL 500 kV CAMPINAS LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  CAMPINAS EL 500 kV CAMPINAS LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  CAMPINAS EL 345 kV CAMPINAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 2040/2009 20/04/2013 19/04/2039 427,280.39
  CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBNI REA 5012/2015 20/08/2018 20/08/2050 449,031.28
  CAMPINAS TR 500/345 kV CAMPINAS TRR1 SP RB FT TR 500/345 kV CAMPINAS TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 496,318.00
  CAMPINAS TR 345/138 kV CAMPINAS TRR1 SP RBF FT TR 345/138 kV CAMPINAS TRR1 SP 062/2001 IPCA RBNI REA 8707/2020 27/07/2021 27/07/2056 500,307.48
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  CAMPINAS TR 345/138 kV CAMPINAS TR5 SP RBF FT TR 345/138 kV CAMPINAS TR5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30
  CAMPINAS TR 345/138 kV CAMPINAS TR4 SP RBF FT TR 345/138 kV CAMPINAS TR4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30
  CAMPINAS TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30
  CAMPINAS TR 345/138 kV CAMPINAS TR2 SP RBF FT TR 345/138 kV CAMPINAS TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30
  CAMPINAS TR 345/138 kV CAMPINAS TR1 SP RBF FT TR 345/138 kV CAMPINAS TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30

 

177 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

  CAMPINAS RTL 500 kV 136 MVAr CAMPINAS RTC2 SP RB FT RTL 500 kV 136 MVAr CAMPINAS RTC2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 582,461.97
  CAMPINAS MC 345 kV TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  CAMPINAS BC 345 kV 100 Mvar CAMPINAS BC2 SP RB FT BC 345 kV 100 Mvar CAMPINAS BC2 SP 062/2001 IPCA RBNI REA 5012/2015 20/08/2018 20/08/2038 1,143,704.51
  CAMPINAS BC 345 kV 100 Mvar CAMPINAS BC1 SP RB FT BC 345 kV 100 Mvar CAMPINAS BC1 SP 062/2001 IPCA RBNI REA 5012/2015 20/08/2018 20/08/2038 1,143,704.51
  CAMPINAS MC 345 kV BC 345 kV 100 Mvar CAMPINAS BC1 SP RB FT BC 345 kV 100 Mvar CAMPINAS BC1 SP 062/2001 IPCA RBNI REA 5012/2015 20/08/2018 20/08/2045 1,188,483.82
  CAMPINAS MC 345 kV BC 345 kV 100 Mvar CAMPINAS BC2 SP RB FT BC 345 kV 100 Mvar CAMPINAS BC2 SP 062/2001 IPCA RBNI REA 5012/2015 20/08/2018 20/08/2045 1,188,631.57
  CAMPINAS TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,382,795.83
  CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,443,922.28
  CAMPINAS TR 500/345 kV CAMPINAS TR54 SP RB FT TR 500/345 kV CAMPINAS TR54 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,488,086.24
  CAMPINAS TR 500/345 kV CAMPINAS TR51 SP RB FT TR 500/345 kV CAMPINAS TR51 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,488,086.24
  CAMPINAS TR 345/138 kV CAMPINAS TR3 SP RBF FT TR 345/138 kV CAMPINAS TR3 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,662,006.76
  CAMPINAS MG 500 kV CAMPINAS MG1 SP RB FT MG 500 kV CAMPINAS MG1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,440,065.92
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBNI REA 5861/2016 21/12/2017 20/12/2045 0.01
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 3,631.41
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RMEL REN 443/2011 24/01/2014 23/01/2034 4,283.58
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RMEL REN 443/2011 24/01/2014 23/01/2034 4,283.58
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RMEL REN 443/2011 24/01/2014 23/01/2034 4,283.58
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RMEL REN 443/2011 3/11/2016 2/11/2039 4,674.24
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RMEL REN 443/2011 3/11/2016 2/11/2039 4,674.24
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RMEL REN 443/2011 3/11/2016 2/11/2039 4,674.24
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-2 RJ/ES DIT   062/2001 IPCA RCDM REA 1814/2009 2/1/2019 1/1/2049 10,347.00
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /IRIRI C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 10/3/2015 9/3/2036 13,360.27
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-1 RJ/ES DIT   062/2001 IPCA RMEL REN 643/2014 2/8/2015 1/8/2036 13,527.06
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 29/09/2015 28/09/2036 13,599.64
  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 2/11/2015 1/11/2037 13,630.94
  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 13/05/2016 12/5/2038 13,843.88
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-2 RJ/ES DIT   062/2001 IPCA RMEL REN 443/2011 11/6/2017 10/6/2040 14,243.51
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBNI REA 6787/2017 5/11/2018 5/11/2050 18,074.93
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RMEL REN 643/2014 26/09/2015 25/09/2036 27,191.02
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBNI REA 1814/2009 2/1/2019 1/1/2049 28,406.60
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES 062/2001 IPCA RBNI REA 2040/2009 6/4/2015 5/4/2036 29,180.08
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES 062/2001 IPCA RBNI REA 2040/2009 6/4/2015 5/4/2036 29,180.08
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBNI REA 2040/2009 6/4/2015 5/4/2036 29,180.08
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBNI REA 2040/2009 6/4/2015 5/4/2036 29,180.08
  CAMPOS MC 138 kV BC 138 kV 25 Mvar CAMPOS BC1-A RJ DIT   062/2001 IPCA RCDM REA 1814/2009 16/03/2016 15/03/2044 29,995.79
  CAMPOS MC 138 kV BC 138 kV 25 MVAr CAMPOS BC2-A RJ DIT   062/2001 IPCA RCDM REA 1814/2009 24/03/2016 23/03/2044 30,014.95
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RMEL REN 643/2014 20/10/2016 19/10/2039 33,393.55
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC8 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC8 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC7 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC7 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC6 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC6 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC5 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC5 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC4 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC4 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC3 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 3/4/2016 2/4/2044 46,653.25
  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 10/11/2016 9/11/2045 47,334.18
  CAMPOS MC 13,8 kV RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  CAMPOS MC 13,8 kV RTB 13,8 kV 25 Mvar CAMPOS RT3 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  CAMPOS MC 13,8 kV RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  CAMPOS MC 13,8 kV RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RMEL REN 643/2014 29/01/2015 28/01/2039 49,843.60
  CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC8 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC8 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC7 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC7 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC6 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC6 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC5 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC5 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC4 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC4 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  CAMPOS MC 13,8 kV BC 13,8 kV 10 Mvar CAMPOS BC3 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  CAMPOS IB 138 kV MG 345 kV CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RCDM REA 1814/2009 2/1/2019 1/1/2049 65,188.60
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-2 RJ/ES DIT   062/2001 IPCA RCDM REA 1814/2009 2/1/2019 1/1/2049 65,188.60
  CAMPOS IB 138 kV MG 345 kV CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,442.16
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 2/1/2019 1/1/2049 74,191.58
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /IRIRI C-2 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 2/1/2019 1/1/2049 74,191.58
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-1 RJ/ES DIT   062/2001 IPCA RCDM REA 1814/2009 2/1/2019 1/1/2049 74,191.58
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBNI REA 4347/2013 29/05/2019 28/05/2053 74,953.61
  CAMPOS MC 138 kV BC 138 kV 25 MVAr CAMPOS BC2-A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 85,627.81
  CAMPOS MC 138 kV BC 138 kV 25 Mvar CAMPOS BC1-A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 85,627.81
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  CAMPOS EL 138 kV CAMPOS  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,482.83
  CAMPOS EL 138 kV CAMPOS  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,482.83
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ 006/2005 IGPM RBNI REA 2376/2010 30/11/2012 30/11/2039 99,040.82
  CAMPOS BC 138 kV 25 MVAr CAMPOS BC2-B RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 99,953.11
  CAMPOS BC 138 kV 25 MVAr CAMPOS BC2-A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 99,953.11
  CAMPOS BC 138 kV 25 MVAr CAMPOS BC1-B RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 99,953.11
  CAMPOS BC 138 kV 25 Mvar CAMPOS BC1-A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 99,953.11
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC8 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC8 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,516.99
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC7 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC7 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,516.99
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC6 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC6 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,516.99
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC5 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC5 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,516.99
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC4 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC4 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,516.99
  CAMPOS BC 13,8 kV 10 Mvar CAMPOS BC3 RJ RBF FT BC 13,8 kV 10 Mvar CAMPOS BC3 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,516.99
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RMELP REA 7185/2018     112,915.70
  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 3/4/2016 2/4/2047 123,923.12
  CAMPOS MC 345 kV RTL 345 kV 60 MVAr CAMPOS RT6 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT6 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,880.21
  CAMPOS MC 345 kV RTL 345 kV 60 MVAr CAMPOS RT5 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,880.21
  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 22/03/2017 21/03/2049 126,603.42

 

178 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  CAMPOS EL 138 kV CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /IRIRI C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-2 RJ/ES DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  CAMPOS EL 138 kV CAMPOS LT 138 kV CAMPOS /C.ITAPEMIRIM C-1 RJ/ES DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,322.24
  CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT3 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,322.24
  CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,322.24
  CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,322.24
  CAMPOS BC 345 kV 60 Mvar CAMPOS BC9 RJ RB FT BC 345 kV 60 Mvar CAMPOS BC9 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,769.56
  CAMPOS BC 345 kV 60 Mvar CAMPOS BC10 RJ RB FT BC 345 kV 60 Mvar CAMPOS BC10 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 167,769.56
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES 062/2001 IPCA RMEL REN 643/2014 16/09/2014 15/09/2043 178,399.26
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES 062/2001 IPCA RMEL REN 643/2014 16/09/2015 15/09/2045 182,921.85
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RMEL REN 643/2014 25/11/2015 24/11/2046 183,772.77
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBNI REA 6787/2017 2/10/2020 2/10/2052 188,782.73
  CAMPOS MC 345 kV BC 345 kV 60 Mvar CAMPOS BC9 RJ RB FT BC 345 kV 60 Mvar CAMPOS BC9 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,483.99
  CAMPOS MC 345 kV BC 345 kV 60 Mvar CAMPOS BC10 RJ RB FT BC 345 kV 60 Mvar CAMPOS BC10 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,483.99
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,014.90
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,014.90
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,014.90
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RMELP REA 7185/2018     198,268.20
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RMEL REN 643/2014 1/9/2015 31/08/2045 204,080.43
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RMEL REN 643/2014 8/12/2015 7/12/2046 205,337.36
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 207,970.83
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 207,970.83
  CAMPOS MC 345 kV CE 100/-60 MvAr CAMPOS CE1 RJ RB FT CE 100/-60 MvAr CAMPOS CE1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 213,145.33
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBNI REA 6787/2017 2/10/2020 2/10/2038 234,477.11
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBNI REA 6787/2017 5/11/2018 5/11/2036 237,770.76
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT4 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 310,485.62
  CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT2 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 310,485.62
  CAMPOS RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ RBF FT RTB 13,8 kV 25 Mvar CAMPOS RT1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 310,485.62
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBNI REA 6787/2017 5/11/2018 5/11/2042 354,395.44
  CAMPOS RTL 345 kV 60 MVAr CAMPOS RT6 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT6 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,109.29
  CAMPOS RTL 345 kV 60 MVAr CAMPOS RT5 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,109.29
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 400,362.62
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 400,362.62
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBNI REA 6787/2017 2/10/2020 2/10/2044 419,885.50
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 576,269.91
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBNI REA 4481/2013 9/11/2017 8/11/2047 643,832.63
  CAMPOS TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,335.86
  CAMPOS RTL 345 kV 60 MVAr CAMPOS RT6 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT6 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 917,501.83
  CAMPOS RTL 345 kV 60 MVAr CAMPOS RT5 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 917,501.83
  CAMPOS TR 345/138 kV CAMPOS TRR1 RJ RBF FT TR 345/138 kV CAMPOS TRR1 RJ 062/2001 IPCA RBNI REA 4188/2013 26/05/2017 25/05/2051 928,642.78
  CAMPOS TR 345/138 kV CAMPOS TRR2 RJ RBF FT TR 345/138 kV CAMPOS TRR2 RJ 062/2001 IPCA RBNI REA 4481/2013 9/11/2017 8/11/2052 949,437.99
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 991,331.59
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,109,371.58
  CAMPOS MC 345 kV TR 345/138 kV CAMPOS TR4 RJ RBF FT TR 345/138 kV CAMPOS TR4 RJ 062/2001 IPCA RBNI REA 4481/2013 9/11/2017 8/11/2049 1,579,078.56
  CAMPOS TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,692,336.36
  CAMPOS RTL 345 kV 60 MVAr CAMPOS RT5 RJ RB FT RTL 345 kV 60 MVAr CAMPOS RT5 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,766,273.82
  CAMPOS MC 138 kV TR 345/138 kV CAMPOS TR4 RJ RBF FT TR 345/138 kV CAMPOS TR4 RJ 062/2001 IPCA RBNI REA 4481/2013 9/11/2017 8/11/2053 1,854,963.60
  CAMPOS CE 100/-60 MvAr CAMPOS CE1 RJ RB FT CE 100/-60 MvAr CAMPOS CE1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,059,661.27
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,361,793.34
  CAMPOS EL 345 kV CAMPOS LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ 006/2005 IGPM RBL CC 006/2005 2/6/2010 4/3/2035 3,034,584.73
  CAMPOS TR 345/138 kV CAMPOS TR4 RJ RBF FT TR 345/138 kV CAMPOS TR4 RJ 062/2001 IPCA RBNI REA 4481/2013 9/11/2017 8/11/2051 3,098,938.44
  CAMPOS TR 345/138 kV CAMPOS TR2 RJ RBF FT TR 345/138 kV CAMPOS TR2 RJ 062/2001 IPCA RBNI REA 6787/2017 5/11/2018 5/11/2053 3,111,157.88
  CAMPOS TR 345/138 kV CAMPOS TR3 RJ RBF FT TR 345/138 kV CAMPOS TR3 RJ 062/2001 IPCA RBNI REA 6787/2017 2/10/2020 2/10/2055 3,451,736.49
  CAMPOS TR 345/138 kV CAMPOS TR1 RJ RBF FT TR 345/138 kV CAMPOS TR1 RJ 062/2001 IPCA RMELP REA 7185/2018     3,579,319.89
  CAMPOS MG 345 kV CAMPOS MG1 RJ RB FT MG 345 kV CAMPOS MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,546,665.31
  CORUMBA MG 345 kV CORUMBA MG1 GO RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2031 13,623.99
  CORUMBA MG 345 kV CORUMBA MG1 GO RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2031 13,623.99
  CORUMBA EL 345 kV CORUMBA  LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 4347/2013 9/4/2018 8/4/2033 17,146.24
  CORUMBA EL 345 kV CORUMBA  LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2030 55,364.75
  CORUMBA IB 345 kV MG 345 kV CORUMBA MG1 GO IB1 RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  CORUMBA EL 345 kV CORUMBA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBNI REA 5861/2016 9/2/2021 8/2/2036 214,710.55
  CORUMBA EL 345 kV CORUMBA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  CORUMBA EL 345 kV CORUMBA  LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  CORUMBA IB 345 kV MG 345 kV CORUMBA MG1 GO IB1 RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 469,392.83
  CORUMBA MG 345 kV CORUMBA MG1 GO RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 475,325.69
  CORUMBA EL 345 kV CORUMBA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  CORUMBA EL 345 kV CORUMBA  LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  CORUMBA IB 345 kV MG 345 kV CORUMBA MG1 GO IB1 RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 903,623.56
  CORUMBA MG 345 kV CORUMBA MG1 GO RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,132,437.48
  CORUMBA EL 345 kV CORUMBA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,196,446.96
  CORUMBA EL 345 kV CORUMBA  LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,196,446.96
  CORUMBA MG 345 kV CORUMBA MG1 GO RB FT MG 345 kV CORUMBA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,180,044.35
  ESTREITO IB 345 kV MG 345 kV ESTREITO MG1 MG IB1 RB FT MG 345 kV ESTREITO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  ESTREITO EL 345 kV ESTREITO LT 345 kV ESTREITO /M. MORAES C-1 MG RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  ESTREITO EL 345 kV ESTREITO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  ESTREITO EL 345 kV ESTREITO LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  ESTREITO EL 345 kV ESTREITO LT 345 kV ESTREITO /FURNAS C-1 MG RB FT LT 345 kV ESTREITO /FURNAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  ESTREITO MG 345 kV ESTREITO MG1 MG RB FT MG 345 kV ESTREITO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 560,838.62

 

 

179 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RMEL REN 443/2011 6/7/2017 5/7/2036 442.99
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RMEL REN 443/2011 6/7/2017 5/7/2036 442.99
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RMEL REN 443/2011 6/7/2017 5/7/2036 442.99
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RMEL REN 443/2011 6/7/2017 5/7/2036 442.99
  F.IGUACU 50HZ MG 500 kV F.IGUACU 50HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 6/11/2016 5/11/2040 658.06
  F.IGUACU 50HZ MG 500 kV F.IGUACU 50HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 6/11/2016 5/11/2040 658.06
  F.IGUACU 50HZ MG 500 kV F.IGUACU 50HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 6/11/2016 5/11/2040 658.06
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2036 1,995.85
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2036 1,995.85
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2036 1,995.85
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2036 1,995.85
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/05/2017 15/05/2036 2,101.07
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/05/2017 15/05/2036 2,101.07
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/05/2017 15/05/2036 2,101.07
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/05/2017 15/05/2036 2,527.24
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR DIT   062/2001 IPCA RMEL REN 443/2011 2/12/2016 1/12/2040 13,153.00
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR DIT   062/2001 IPCA RMEL REN 443/2011 2/12/2016 1/12/2040 13,153.00
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR DIT   062/2001 IPCA RMEL REN 443/2011 2/12/2016 1/12/2040 13,153.00
  F.IGUACU 50HZ BF 500 kV 280,3 Mvar F.IGUACU 50HZ 5-ZRE PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 284,658.27
  F.IGUACU 50HZ BF 500 kV 280,3 Mvar F.IGUACU 50HZ 4-ZRD PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 284,658.27
  F.IGUACU 50HZ BF 500 kV 280,3 Mvar F.IGUACU 50HZ 3-ZRC PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 284,658.27
  F.IGUACU 50HZ BF 500 kV 349 Mvar F.IGUACU 50HZ 2-ZRB PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 300,042.99
  F.IGUACU 50HZ BF 500 kV 349 Mvar F.IGUACU 50HZ 1-ZRA PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 300,042.99
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR7 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR6 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR5 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR4 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  F.IGUACU 50HZ MC 500 kV BC 500 kV 349 MVAr F.IGUACU 50HZ BC2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 328,034.91
  F.IGUACU 50HZ MC 500 kV BC 500 kV 349 MVAr F.IGUACU 50HZ BC1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 328,034.91
  F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC5 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 328,034.91
  F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC4 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 328,034.91
  F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 328,034.91
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB9 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB8 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB7 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB6 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB5 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB11 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB10 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  F.IGUACU 50HZ EL 500 kV F.IGUACU 50HZ LT 500 kV MARGEM DIREITA /F.IGUACU 50HZ C-2 RS/PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  F.IGUACU 50HZ EL 500 kV F.IGUACU 50HZ LT 500 kV MARGEM DIREITA /F.IGUACU 50HZ C-1 RS/PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  F.IGUACU 50HZ EL 500 kV F.IGUACU 50HZ LT 500 kV ITAIPU 50HZ /F.IGUACU 50HZ C-2 RS/PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  F.IGUACU 50HZ EL 500 kV F.IGUACU 50HZ LT 500 kV ITAIPU 50HZ /F.IGUACU 50HZ C-1 RS/PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR8 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR6 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR5 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  F.IGUACU 50HZ MC 500 kV TR 500/127 kV F.IGUACU 50HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  F.IGUACU 50HZ MC 500 kV BC 500 kV 349 MVAr F.IGUACU 50HZ BC2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 781,525.25
  F.IGUACU 50HZ MC 500 kV BC 500 kV 349 MVAr F.IGUACU 50HZ BC1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 781,525.25
  F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC5 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 781,525.25
  F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC4 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 781,525.25
  F.IGUACU 50HZ MC 500 kV BC 500 kV 280,3 MVAr F.IGUACU 50HZ BC3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 781,525.25
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB2 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 814,023.51
  F.IGUACU 50HZ IB 500 kV MG 500 kV F.IGUACU 50HZ MG1 PR IB1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 814,023.51
  F.IGUACU 50HZ EL 500 kV F.IGUACU 50HZ LT 500 kV ITAIPU 50HZ /F.IGUACU 50HZ C-2 RS/PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 869,108.22
  F.IGUACU 50HZ MG 500 kV F.IGUACU 50HZ MG1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,159,429.11
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CVR4 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,361,261.23
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CVR3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,361,261.23
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CVR2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,361,261.23
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CVR1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,361,261.23
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV8 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV7 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV6 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV4 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV8 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 24,024,063.51
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV7 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 24,024,063.51
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV6 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 24,024,063.51
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 24,024,063.51
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV4 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 24,024,063.51
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 24,024,063.51
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 24,024,063.51
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 24,024,063.51
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV8 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 46,248,490.29
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV7 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 46,248,490.29

 

180 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV6 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 46,248,490.29
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV5 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 46,248,490.29
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV4 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 46,248,490.29
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 46,248,490.29
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 46,248,490.29
  F.IGUACU 50HZ CV 600/600 kV F.IGUACU 50HZ CV1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 46,248,490.29
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 1,691.44
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RMEL REN 643/2014 20/03/2016 19/03/2038 7,173.86
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 8,688.05
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 8,688.05
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 8,688.05
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 8,688.05
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 8,688.07
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RCDM REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RCDM REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RCDM REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RCDM REA 8314/2019 9/7/2019 8/7/2034 20,100.76
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RCDM REA 8314/2019 9/7/2019 8/7/2034 20,100.76
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RCDM REA 8314/2019 9/7/2019 8/7/2034 20,100.76
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RCDM REA 8314/2019 9/7/2019 8/7/2034 35,395.41
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RCDM REA 5484/2015 10/2/2021 9/2/2036 51,563.27
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RCDM REA 5484/2015 10/2/2021 9/2/2036 51,563.27
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RCDM REA 5484/2015 10/2/2021 9/2/2036 62,662.58
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RCDM REA 5484/2015 10/2/2021 9/2/2036 62,662.58
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RCDM REA 5484/2015 10/2/2021 9/2/2036 67,435.71
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RCDM REA 5484/2015 10/2/2021 9/2/2036 67,435.71
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RCDM REA 5484/2015 22/04/2019 21/04/2034 96,019.31
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RCDM REA 5484/2015 22/04/2019 21/04/2034 96,549.82
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB3 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB1 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  F.IGUACU 60HZ EL 500 kV F.IGUACU 60HZ  EL3 RB FT EL 500 kV F.IGUACU 60HZ  EL3 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  F.IGUACU 60HZ EL 500 kV F.IGUACU 60HZ  EL1 RB FT EL 500 kV F.IGUACU 60HZ  EL1 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  F.IGUACU 60HZ EL 500 kV F.IGUACU 60HZ  EL5 RB FT EL 500 kV F.IGUACU 60HZ  EL5 062/2001 IPCA RBNI REA 2069/2009 5/6/2012 4/6/2040 410,962.92
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 506,862.26
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 506,862.26
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 506,862.26
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 506,862.26
  F.IGUACU 60HZ MG 500 kV F.IGUACU 60HZ MG1 PR RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 5012/2015 22/04/2019 22/04/2051 528,726.60
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RCDM REA 5012/2015 22/04/2019 22/04/2051 536,232.55
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  F.IGUACU 60HZ IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  F.IGUACU 60HZ IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  F.IGUACU 60HZ IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  F.IGUACU 60HZ IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB5 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 2069/2009 5/6/2012 4/6/2039 725,700.81
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TRR5 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 768,429.41
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 809,719.00
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 809,719.00
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 809,719.00
  F.IGUACU 60HZ MG 500 kV F.IGUACU 60HZ MG1 PR RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 2069/2009 5/6/2012 4/6/2033 938,292.79
  F.IGUACU 60HZ EL 500 kV F.IGUACU 60HZ  EL2 RB FT EL 500 kV F.IGUACU 60HZ  EL2 062/2001 IPCA RBNI REA 2069/2009 27/02/2012 26/02/2038 968,050.17
  F.IGUACU 60HZ EL 500 kV F.IGUACU 60HZ  EL4 RB FT EL 500 kV F.IGUACU 60HZ  EL4 062/2001 IPCA RBNI REA 2069/2009 15/06/2012 14/06/2038 1,049,367.76
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,207,571.62
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,207,571.62
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,207,571.62
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,207,571.62
  F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB2 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 2069/2009 27/02/2012 26/02/2038 1,213,597.28
  F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB4 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 2069/2009 15/06/2012 14/06/2039 1,268,382.48
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,371,096.78
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,371,096.78
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,371,096.78
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RCDM REA 2069/2009 27/02/2012 26/02/2038 1,457,721.07
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RCDM REA 2069/2009 15/06/2012 14/06/2038 1,470,674.62
  F.IGUACU 60HZ IB 500 kV MG 500 kV F.IGUACU 60HZ MG1 PR IB7 RB FT MG 500 kV F.IGUACU 60HZ MG1 PR 062/2001 IPCA RBNI REA 5012/2015 22/04/2019 22/04/2050 1,471,158.11
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,476,675.82
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TRR5 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,830,741.07
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,929,111.26
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,929,111.26
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,929,111.26
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 2,028,138.57
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR5 PR DIT   062/2001 IPCA RCDM REA 5012/2015 2/5/2019 2/5/2048 2,156,974.85
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 2,305,288.23
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 2,305,288.23
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 2,305,288.23
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 2,305,288.23
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 2,324,684.35

 

181 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 2,324,684.35
  F.IGUACU 60HZ MC 750 kV TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 2,324,684.35
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 2,639,485.04
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 2,639,485.04
  F.IGUACU 60HZ EL 750 kV F.IGUACU 60HZ LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 2,639,485.04
  F.IGUACU 60HZ IB 750 kV MG 750 kV F.IGUACU 60HZ MG1 PR IB5 DIT   062/2001 IPCA RCDM REA 5012/2015 22/04/2019 22/04/2050 2,663,541.34
  F.IGUACU 60HZ MC 500 kV TR 750/500 kV F.IGUACU 60HZ TR5 PR DIT   062/2001 IPCA RCDM REA 5012/2015 2/5/2019 2/5/2048 3,056,648.76
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TRR5 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 3,524,341.77
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 3,713,713.27
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 3,713,713.27
  F.IGUACU 60HZ RTL 750 kV 330 Mvar F.IGUACU 60HZ RT1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 3,713,713.27
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 4,831,929.30
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 5,492,223.21
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 5,492,223.21
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 5,492,223.21
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 5,492,223.21
  F.IGUACU 60HZ MG 750 kV F.IGUACU 60HZ MG1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 9,301,899.95
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR4 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 10,573,025.33
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 10,573,025.33
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 10,573,025.33
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 10,573,025.33
  F.IGUACU 60HZ TR 750/500 kV F.IGUACU 60HZ TR5 PR DIT   062/2001 IPCA RCDM REA 5012/2015 2/5/2019 2/5/2054 11,775,021.98
  FUNIL MG 138 kV FUNIL MG1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029 2,436.15
  FUNIL IB 138 kV MG 138 kV FUNIL MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  FUNIL IB 138 kV MG 138 kV FUNIL MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 179,725.83
  FUNIL MG 138 kV FUNIL MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 212,733.40
  FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  FUNIL IB 138 kV MG 138 kV FUNIL MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 345,988.44
  FUNIL MG 138 kV FUNIL MG1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 506,825.70
  FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 630,256.63
  FUNIL EL 138 kV FUNIL LT 138 kV SAUDADE /FUNIL C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 630,256.63
  FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 5,984.22
  FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 5/7/2016 4/7/2029 8,384.12
  FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 5/7/2016 4/7/2029 8,384.12
  FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 5/7/2016 4/7/2029 8,384.12
  FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 5/7/2016 4/7/2029 19,501.89
  FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 5/7/2016 4/7/2029 38,538.27
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /PIMENTA C-1 MG RB FT LT 345 kV FURNAS /PIMENTA C-1 MG 062/2001 IPCA RBNI REA 1814/2009 24/11/2014 23/11/2041 72,589.27
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /PIMENTA C-1 MG RB FT LT 345 kV FURNAS /PIMENTA C-1 MG 062/2001 IPCA RBNI REA 1814/2009 6/4/2015 5/4/2045 194,239.35
  FURNAS IB 345 kV MG 345 kV FURNAS MG1 MG IB2 RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  FURNAS IB 345 kV MG 345 kV FURNAS MG1 MG IB1 RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG8 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG7 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG6 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG5 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG4 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG3 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG2 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  FURNAS IB 345 kV MG 345 kV FURNAS MG1 MG IB2 RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RBNI REA 1814/2009 6/4/2015 5/4/2044 223,722.85
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /PIMENTA C-1 MG RB FT LT 345 kV FURNAS /PIMENTA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /M. MORAES C-1 MG RB FT LT 345 kV FURNAS /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  FURNAS EL 345 kV FURNAS LT 345 kV ESTREITO /FURNAS C-1 MG RB FT LT 345 kV ESTREITO /FURNAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RBNI REA 1814/2009 30/01/2012 29/01/2037 331,516.03
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RBNI REA 1814/2009 8/7/2012 7/7/2038 403,917.90
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RBNI REA 1814/2009 30/09/2012 29/09/2038 407,131.69
  FURNAS EL 345 kV FURNAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RBNI REA 1814/2009 2/12/2012 1/12/2038 409,488.69
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG5 MG DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG3 MG DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  FURNAS MC 345 kV TR 15/345 kV FURNAS TRG2 MG DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  FURNAS MG 345 kV FURNAS MG1 MG RB FT MG 345 kV FURNAS MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,073,916.18
  GRAJAU MG 500 kV GRAJAU MG1 RJ RB FT MG 500 kV GRAJAU MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2045 3,161.02
  GRAJAU EL 500 kV GRAJAU LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ RB FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ 062/2001 IPCA RBNI REA 4347/2013 9/4/2018 8/4/2033 9,177.98
  GRAJAU EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 7/9/2015 6/9/2036 15,282.83
  GRAJAU EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 7/9/2015 6/9/2036 15,282.83
  GRAJAU EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RMEL REN 443/2011 7/9/2015 6/9/2036 15,282.83
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR54 RJ RBF FT TR 500/138 kV GRAJAU TR54 RJ 062/2001 IPCA RBNI REA 4347/2013 9/4/2018 8/4/2033 17,146.24
  GRAJAU EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RBNI REA 4347/2013 9/4/2018 8/4/2033 17,146.24
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR58 RJ RBF FT TR 500/138 kV GRAJAU TR58 RJ 062/2001 IPCA RBNI REA 4347/2013 9/4/2018 8/4/2033 19,196.34
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RBNI REA 4347/2013 9/4/2018 8/4/2033 19,196.34
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR52 RJ RBF FT TR 500/138 kV GRAJAU TR52 RJ 062/2001 IPCA RBNI REA 4347/2013 9/4/2018 8/4/2033 19,196.34
  GRAJAU MC 13,8 kV CS 200/-150 MVAr GRAJAU CS2 RJ RBF FT CS 200/-150 MVAr GRAJAU CS2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,911.63
  GRAJAU MC 13,8 kV CS 200/-150 MVAr GRAJAU CS1 RJ RBF FT CS 200/-150 MVAr GRAJAU CS1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,911.63
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR58 RJ RBF FT TR 500/138 kV GRAJAU TR58 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR54 RJ RBF FT TR 500/138 kV GRAJAU TR54 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  GRAJAU MC 500 kV TR 500/138 kV GRAJAU TR52 RJ RBF FT TR 500/138 kV GRAJAU TR52 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  GRAJAU IB 500 kV MG 500 kV GRAJAU MG1 RJ IB1 RB FT MG 500 kV GRAJAU MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  GRAJAU MG 500 kV GRAJAU MG1 RJ RB FT MG 500 kV GRAJAU MG1 RJ 062/2001 IPCA RBNI REA 3178/2011 14/11/2013 13/11/2037 356,849.63

 

182 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  GRAJAU EL 500 kV GRAJAU LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ RB FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  GRAJAU EL 500 kV GRAJAU LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  GRAJAU IB 138 kV MG 500 kV GRAJAU MG1 RJ IB2 DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2041 695,742.77
  GRAJAU IB 138 kV MG 500 kV GRAJAU MG1 RJ IB1 DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2041 695,742.77
  GRAJAU TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 919,583.23
  GRAJAU MG 500 kV GRAJAU MG1 RJ RB FT MG 500 kV GRAJAU MG1 RJ 062/2001 IPCA RBNI REA 4552/2014 26/02/2018 26/02/2055 925,088.90
  GRAJAU EL 138 kV GRAJAU LT 138 kV GRAJAU /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 972,179.79
  GRAJAU EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-5 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 972,179.79
  GRAJAU EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-4 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2046 972,179.79
  GRAJAU EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-3 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 972,179.79
  GRAJAU EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-2 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 972,179.79
  GRAJAU EL 138 kV GRAJAU LT 138 kV CASCADURA /GRAJAU C-1 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 972,179.79
  GRAJAU MC 138 kV TR 500/138 kV GRAJAU TR58 RJ RBF FT TR 500/138 kV GRAJAU TR58 RJ 062/2001 IPCA RBNI REA 4552/2014 26/02/2018 26/02/2040 978,720.89
  GRAJAU MC 138 kV TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RBNI REA 4552/2014 26/02/2018 26/02/2040 978,720.89
  GRAJAU MC 138 kV TR 500/138 kV GRAJAU TR54 RJ RBF FT TR 500/138 kV GRAJAU TR54 RJ 062/2001 IPCA RBNI REA 4552/2014 26/02/2018 26/02/2040 978,720.89
  GRAJAU MC 138 kV TR 500/138 kV GRAJAU TR52 RJ RBF FT TR 500/138 kV GRAJAU TR52 RJ 062/2001 IPCA RBNI REA 4552/2014 26/02/2018 26/02/2040 978,720.89
  GRAJAU MG 500 kV GRAJAU MG1 RJ RB FT MG 500 kV GRAJAU MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,144,096.12
  GRAJAU EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-4 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,160,384.17
  GRAJAU EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-3 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,160,384.17
  GRAJAU EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-2 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,160,384.17
  GRAJAU EL 138 kV GRAJAU LT 138 kV TERMINAL SUL /GRAJAU C-1 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,160,384.17
  GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-6 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,160,384.17
  GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-5 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,160,384.17
  GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-4 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,160,384.17
  GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-3 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,160,384.17
  GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-2 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,160,384.17
  GRAJAU EL 138 kV GRAJAU LT 138 kV FREI CANECA /GRAJAU C-1 RJ DIT   062/2001 IPCA RCDM REA 4552/2014 26/02/2018 26/02/2040 1,160,384.17
  GRAJAU CS 200/-150 MVAr GRAJAU CS2 RJ RBF FT CS 200/-150 MVAr GRAJAU CS2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,545,311.33
  GRAJAU CS 200/-150 MVAr GRAJAU CS1 RJ RBF FT CS 200/-150 MVAr GRAJAU CS1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,545,311.33
  GRAJAU TR 500/138 kV GRAJAU TRR2 RJ RBF FT TR 500/138 kV GRAJAU TRR2 RJ 062/2001 IPCA RBNI REA 3178/2011 14/11/2013 13/11/2043 1,618,466.55
  GRAJAU TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RMEL REA 5457/2015 13/10/2015 12/10/2048 1,747,832.61
  GRAJAU TR 500/138 kV GRAJAU TRR1 RJ RBF FT TR 500/138 kV GRAJAU TRR1 RJ 062/2001 IPCA RMEL REA 5457/2015 29/04/2016 28/04/2049 1,766,625.08
  GRAJAU TR 500/138 kV GRAJAU TR56 RJ RBF FT TR 500/138 kV GRAJAU TR56 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,190,856.78
  GRAJAU CS 200/-150 MVAr GRAJAU CS2 RJ RBF FT CS 200/-150 MVAr GRAJAU CS2 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,681,619.78
  GRAJAU CS 200/-150 MVAr GRAJAU CS1 RJ RBF FT CS 200/-150 MVAr GRAJAU CS1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,681,619.78
  GRAJAU TR 500/138 kV GRAJAU TR52 RJ RBF FT TR 500/138 kV GRAJAU TR52 RJ 062/2001 IPCA RMEL REA 5457/2015 15/09/2015 14/09/2047 5,235,613.68
  GRAJAU TR 500/138 kV GRAJAU TR58 RJ RBF FT TR 500/138 kV GRAJAU TR58 RJ 062/2001 IPCA RMEL REA 5457/2015 2/11/2015 1/11/2048 5,248,756.11
  GRAJAU TR 500/138 kV GRAJAU TR54 RJ RBF FT TR 500/138 kV GRAJAU TR54 RJ 062/2001 IPCA RMEL REA 5457/2015 20/12/2015 19/12/2048 5,263,016.57
  GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 781.52
  GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 5,064.75
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-2 SP RB FT LT 345 kV NORTE /GUARULHOS C-2 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 5,064.75
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-1 SP RB FT LT 345 kV NORTE /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 5,064.75
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 5,064.75
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 5,064.75
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 5,064.75
  GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 6,077.70
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 6,077.70
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 6,077.70
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBNI REA 4347/2013 18/01/2016 17/01/2042 6,077.70
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2040 6,413.60
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 4/11/2015 3/11/2033 40,863.29
  GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBNI REA 5861/2016 21/12/2017 20/12/2034 44,395.29
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 5484/2015 27/11/2018 26/11/2048 51,089.40
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2048 77,092.09
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2048 77,092.09
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2048 77,092.09
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBNI REA 5484/2015 2/10/2017 1/10/2047 95,550.79
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 5484/2015 2/10/2017 1/10/2047 95,550.79
  GUARULHOS MC 345 kV BC 345 kV 150 Mvar GUARULHOS BC2 SP RB FT BC 345 kV 150 Mvar GUARULHOS BC2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,483.99
  GUARULHOS MC 345 kV BC 345 kV 100 Mvar GUARULHOS BC1 SP RB FT BC 345 kV 100 Mvar GUARULHOS BC1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,483.99
  GUARULHOS IB 345 kV MG 345 kV GUARULHOS MG1 SP IB1 RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  GUARULHOS BC 345 kV 100 Mvar GUARULHOS BC1 SP RB FT BC 345 kV 100 Mvar GUARULHOS BC1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 201,852.54
  GUARULHOS BC 345 kV 150 Mvar GUARULHOS BC2 SP RB FT BC 345 kV 150 Mvar GUARULHOS BC2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 228,905.73
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-2 SP RB FT LT 345 kV NORTE /GUARULHOS C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-1 SP RB FT LT 345 kV NORTE /GUARULHOS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-2 SP RB FT LT 345 kV NORTE /GUARULHOS C-2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV NORTE /GUARULHOS C-1 SP RB FT LT 345 kV NORTE /GUARULHOS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 731,864.47
  GUARULHOS EL 345 kV GUARULHOS LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,196,446.96
  GUARULHOS MG 345 kV GUARULHOS MG1 SP RB FT MG 345 kV GUARULHOS MG1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,743,627.11
  GURUPI MC 69 kV RTN 69 kV 0,5 Mvar GURUPI RTNSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,280.55
  GURUPI MC 69 kV RTN 69 kV 0,5 Mvar GURUPI RTNMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,280.55
  GURUPI RTN 69 kV 0,5 Mvar GURUPI RTNSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,718.23
  GURUPI RTN 69 kV 0,5 Mvar GURUPI RTNMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,718.23
  GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBNI REA 6370/2017 11/11/2020 11/11/2051 36,628.75
  GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBNI REA 6370/2017 18/11/2020 18/11/2051 36,628.75
  GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBNI REA 5861/2016 13/09/2017 12/9/2033 44,649.82

 

183 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031 149,494.77
  GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031 151,592.09
  GURUPI MC 500 kV RTL 500 kV 136 MVAr GURUPI RSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,061.65
  GURUPI MC 500 kV RTL 500 kV 136 MVAr GURUPI RMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,061.65
  GURUPI IB 500 kV MG 500 kV GURUPI MG2 TO IB2 RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  GURUPI EL 500 kV GURUPI LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  GURUPI EL 500 kV GURUPI LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  GURUPI MC 500 kV CR 500 kV 361,5 Mvar GURUPI BC3 TO RB FT CR 500 kV 361,5 Mvar GURUPI BC3 TO 062/2001 IPCA RBNI REA 6370/2017 11/11/2020 11/11/2050 381,474.95
  GURUPI MC 500 kV CR 500 kV 161 MVAr GURUPI BC1 TO RB FT CR 500 kV 161 MVAr GURUPI BC1 TO 062/2001 IPCA RBNI REA 6370/2017 17/11/2020 17/11/2050 381,474.95
  GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 550,852.30
  GURUPI RTL 500 kV 136 MVAr GURUPI RSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 582,461.97
  GURUPI RTL 500 kV 136 MVAr GURUPI RMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 582,461.97
  GURUPI EL 500 kV GURUPI LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 869,108.22
  GURUPI EL 500 kV GURUPI LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 869,108.22
  GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,312,375.50
  GURUPI RTL 500 kV 136 MVAr GURUPI RSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,387,683.81
  GURUPI RTL 500 kV 136 MVAr GURUPI RMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,387,683.81
  GURUPI EL 500 kV GURUPI LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,673,111.75
  GURUPI EL 500 kV GURUPI LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,673,111.75
  GURUPI MG 500 kV GURUPI MG2 TO RB FT MG 500 kV GURUPI MG2 TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,526,441.27
  GURUPI RTL 500 kV 136 MVAr GURUPI RSM1 TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,671,416.57
  GURUPI RTL 500 kV 136 MVAr GURUPI RMI1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,671,416.57
  GURUPI CR 500 kV 161 MVAr GURUPI BC1 TO RB FT CR 500 kV 161 MVAr GURUPI BC1 TO 062/2001 IPCA RBNI REA 6370/2017 17/11/2020 17/11/2040 11,715,358.52
  GURUPI CR 500 kV 361,5 Mvar GURUPI BC3 TO RB FT CR 500 kV 361,5 Mvar GURUPI BC3 TO 062/2001 IPCA RBNI REA 6370/2017 11/11/2020 11/11/2040 14,751,379.73
  IBIUNA CV 600/600 kV IBIUNA CV5 SP DIT   062/2001 IPCA RMEL REN 443/2011 25/05/2017 24/05/2047 2,692.38
  IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RMEL REN 443/2011 20/06/2016 19/06/2031 6,985.14
  IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RMEL REN 443/2011 20/06/2016 19/06/2031 6,985.14
  IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RMEL REN 443/2011 20/06/2016 19/06/2031 6,985.14
  IBIUNA MG 500 kV IBIUNA MG2 SP RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 11,519.29
  IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-2 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBNI REA 5861/2016 10/2/2021 9/2/2036 16,177.38
  IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-1 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBNI REA 5861/2016 10/2/2021 9/2/2036 16,177.38
  IBIUNA MG 500 kV IBIUNA MG2 SP RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBNI REA 8314/2019 11/2/2021 10/2/2036 21,245.28
  IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RBNI REA 8314/2019 11/2/2021 10/2/2036 24,198.63
  IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RBNI REA 8314/2019 11/2/2021 10/2/2036 24,198.63
  IBIUNA EL 345 kV IBIUNA LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RMEL REN 643/2014 6/3/2016 5/3/2038 32,811.76
  IBIUNA MG 500 kV IBIUNA MG2 SP RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBNI REA 7831/2019 13/08/2021 13/08/2051 34,837.01
  IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RBNI REA 8314/2019 10/2/2021 9/2/2036 42,199.61
  IBIUNA MC 20 kV CS 330/-220 MVAr IBIUNA CS4 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,911.63
  IBIUNA MC 20 kV CS 330/-220 MVAr IBIUNA CS3 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,911.63
  IBIUNA MC 20 kV CS 330/-220 MVAr IBIUNA CS2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,911.63
  IBIUNA MC 20 kV CS 330/-220 MVAr IBIUNA CS1 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,911.63
  IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-2 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBNI REA 5484/2015 9/3/2018 8/3/2042 113,275.92
  IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-1 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBNI REA 5484/2015 9/3/2018 8/3/2042 132,155.24
  IBIUNA MC 13,8 kV TR 500/345 kV IBIUNA ATR3 SP RB FT TR 500/345 kV IBIUNA ATR3 SP 034/2001 IGPM RBNI REA 3744/2012 9/12/2015 9/12/2035 133,935.56
  IBIUNA BF 345 kV 59 Mvar IBIUNA ZRJ SP RB FT BF 345 kV 59 Mvar IBIUNA ZRJ SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 166,648.17
  IBIUNA BF 345 kV 59 Mvar IBIUNA ZRI SP RB FT BF 345 kV 59 Mvar IBIUNA ZRI SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 166,648.17
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB9 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB8 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB7 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB6 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB5 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB4 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB3 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB20 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB2 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB19 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB18 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB17 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB16 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB15 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB14 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB13 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB12 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB11 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB10 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB1 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  IBIUNA MC 345 kV TR 345/20 kV IBIUNA TRW2 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  IBIUNA MC 345 kV TR 345/20 kV IBIUNA TRV2 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  IBIUNA MC 345 kV TR 345/20 kV IBIUNA TRU2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  IBIUNA MC 345 kV TR 345/20 kV IBIUNA TRT2 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR8 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR7 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR6 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR5 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR4 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR3 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR2 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR1 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  IBIUNA MC 345 kV BF 345 kV 59 Mvar IBIUNA ZRJ SP RB FT BF 345 kV 59 Mvar IBIUNA ZRJ SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  IBIUNA MC 345 kV BF 345 kV 59 Mvar IBIUNA ZRI SP RB FT BF 345 kV 59 Mvar IBIUNA ZRI SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  IBIUNA MC 345 kV BF 345 kV 296,3 Mvar IBIUNA ZRL SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  IBIUNA MC 345 kV BF 345 kV 296 Mvar IBIUNA ZRN SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  IBIUNA MC 345 kV BF 345 kV 294 Mvar IBIUNA ZRG SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  IBIUNA MC 345 kV BF 345 kV 294 Mvar IBIUNA ZRD SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  IBIUNA MC 345 kV BF 345 kV 279,8 Mvar IBIUNA ZRC SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  IBIUNA MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRH SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 209,948.33

 

184 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  IBIUNA MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRF SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  IBIUNA MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRB SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  IBIUNA MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRA SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  IBIUNA MC 345 kV BF 345 kV 220,8 Mvar IBIUNA ZRM SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  IBIUNA MC 345 kV BF 345 kV 220,8 Mvar IBIUNA ZRK SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  IBIUNA MC 345 kV BF 345 kV 220,8 Mvar IBIUNA ZRE SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  IBIUNA RTB 500 kV 60 Mvar IBIUNA RTR1 SP RB FT RTB 500 kV 60 Mvar IBIUNA RTR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 211,975.11
  IBIUNA MC 345 kV BF 345 kV 294 Mvar IBIUNA ZRD SP DIT   062/2001 IPCA RMEL REN 643/2014 5/2/2016 4/2/2047 233,670.49
  IBIUNA EL 345 kV IBIUNA LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  IBIUNA EL 345 kV IBIUNA LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  IBIUNA EL 345 kV IBIUNA LT 345 kV IBIUNA /INTERLAGOS C-2 SP RB FT LT 345 kV IBIUNA /INTERLAGOS C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  IBIUNA EL 345 kV IBIUNA LT 345 kV IBIUNA /INTERLAGOS C-1 SP RB FT LT 345 kV IBIUNA /INTERLAGOS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  IBIUNA EL 345 kV IBIUNA LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  IBIUNA EL 345 kV IBIUNA LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  IBIUNA BF 345 kV 220,8 Mvar IBIUNA ZRM SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 254,701.67
  IBIUNA BF 345 kV 220,8 Mvar IBIUNA ZRK SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 254,701.67
  IBIUNA BF 345 kV 220,8 Mvar IBIUNA ZRE SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 254,701.67
  IBIUNA BF 345 kV 237 Mvar IBIUNA ZRH SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 259,425.74
  IBIUNA BF 345 kV 237 Mvar IBIUNA ZRF SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 259,425.74
  IBIUNA BF 345 kV 237 Mvar IBIUNA ZRB SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 259,425.74
  IBIUNA BF 345 kV 237 Mvar IBIUNA ZRA SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 259,425.74
  IBIUNA BF 345 kV 279,8 Mvar IBIUNA ZRC SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 270,502.48
  IBIUNA BF 345 kV 294 Mvar IBIUNA ZRG SP RB FT BF 345 kV 294 Mvar IBIUNA ZRG SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 273,805.50
  IBIUNA BF 345 kV 294 Mvar IBIUNA ZRD SP RB FT BF 345 kV 294 Mvar IBIUNA ZRD SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 273,805.50
  IBIUNA BF 345 kV 296,3 Mvar IBIUNA ZRL SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 274,325.44
  IBIUNA BF 345 kV 296 Mvar IBIUNA ZRN SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 274,325.44
  IBIUNA MC 500 kV RTB 500 kV 180 Mvar IBIUNA RT3 SP RB FT RTB 500 kV 180 Mvar IBIUNA RT3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 301,456.04
  IBIUNA IB 500 kV MG 500 kV IBIUNA MG2 SP IB4 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  IBIUNA IB 500 kV MG 500 kV IBIUNA MG2 SP IB3 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  IBIUNA IB 500 kV MG 500 kV IBIUNA MG2 SP IB2 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  IBIUNA IB 500 kV MG 500 kV IBIUNA MG2 SP IB1 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB3 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 469,392.83
  IBIUNA IB 345 kV MG 500 kV IBIUNA MG2 SP IB2 RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 469,392.83
  IBIUNA MC 345 kV TR 345/122 kV IBIUNA TR7 SP DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 483,744.89
  IBIUNA TR 345/20 kV IBIUNA TRW2 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 494,481.86
  IBIUNA TR 345/20 kV IBIUNA TRV2 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 494,481.86
  IBIUNA TR 345/20 kV IBIUNA TRU2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 494,481.86
  IBIUNA TR 345/20 kV IBIUNA TRT2 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 494,481.86
  IBIUNA MC 345 kV BF 345 kV 237 Mvar IBIUNA ZRA SP DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 500,190.42
  IBIUNA RTB 500 kV 180 Mvar IBIUNA RT3 SP RB FT RTB 500 kV 180 Mvar IBIUNA RT3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 635,925.33
  IBIUNA TR 345/20 kV IBIUNA TRW2 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,178,076.01
  IBIUNA TR 345/20 kV IBIUNA TRV2 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,178,076.01
  IBIUNA TR 345/20 kV IBIUNA TRU2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,178,076.01
  IBIUNA TR 345/20 kV IBIUNA TRT2 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,178,076.01
  IBIUNA MC 345 kV TR 500/345 kV IBIUNA ATR2 SP RB FT TR 500/345 kV IBIUNA ATR2 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 1,395,950.23
  IBIUNA MC 345 kV TR 500/345 kV IBIUNA ATR1 SP RB FT TR 500/345 kV IBIUNA ATR1 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 1,395,950.23
  IBIUNA MC 345 kV TR 500/345 kV IBIUNA ATR3 SP RB FT TR 500/345 kV IBIUNA ATR3 SP 034/2001 IGPM RBNI REA 3744/2012 9/12/2015 9/12/2042 1,660,501.63
  IBIUNA CS 330/-220 MVAr IBIUNA CS4 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,102,476.72
  IBIUNA CS 330/-220 MVAr IBIUNA CS3 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,102,476.72
  IBIUNA CS 330/-220 MVAr IBIUNA CS2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,102,476.72
  IBIUNA CS 330/-220 MVAr IBIUNA CS1 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,102,476.72
  IBIUNA TR 345/20 kV IBIUNA TRW2 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,267,902.64
  IBIUNA TR 345/20 kV IBIUNA TRV2 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,267,902.64
  IBIUNA TR 345/20 kV IBIUNA TRU2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,267,902.64
  IBIUNA TR 345/20 kV IBIUNA TRT2 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,267,902.64
  IBIUNA MC 500 kV TR 500/345 kV IBIUNA ATR3 SP RB FT TR 500/345 kV IBIUNA ATR3 SP 034/2001 IGPM RBNI REA 3744/2012 9/12/2015 9/12/2043 2,418,974.39
  IBIUNA MC 500 kV TR 500/345 kV IBIUNA ATR2 SP RB FT TR 500/345 kV IBIUNA ATR2 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 2,561,943.77
  IBIUNA MC 500 kV TR 500/345 kV IBIUNA ATR1 SP RB FT TR 500/345 kV IBIUNA ATR1 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 2,561,943.77
  IBIUNA RTL 500 kV 105 Mvar IBIUNA RTINBC2 SP RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 2,832,237.14
  IBIUNA RTL 500 kV 105 Mvar IBIUNA RTINBC1 SP RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 2,832,237.14
  IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-2 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 2,840,153.68
  IBIUNA EL 500 kV IBIUNA LT 500 kV IBIUNA /BATEIAS C-1 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 2,840,153.68
  IBIUNA MG 500 kV IBIUNA MG2 SP RB FT MG 500 kV IBIUNA MG2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,877,443.05
  IBIUNA CV 600/600 kV IBIUNA CVR4 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,361,261.23
  IBIUNA CV 600/600 kV IBIUNA CVR3 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,361,261.23
  IBIUNA CV 600/600 kV IBIUNA CVR2 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,361,261.23
  IBIUNA CV 600/600 kV IBIUNA CVR1 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 3,361,261.23
  IBIUNA TR 345/20 kV IBIUNA TR2RES SP RB FT TR 345/20 kV IBIUNA TR2RES SP 062/2001 IPCA RBNI REA 7831/2019 20/08/2021 20/08/2056 3,880,106.90
  IBIUNA CS 330/-220 MVAr IBIUNA CS4 SP RB FT CS 330/-220 MVAr IBIUNA CS4 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,009,035.89
  IBIUNA CS 330/-220 MVAr IBIUNA CS3 SP RB FT CS 330/-220 MVAr IBIUNA CS3 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,009,035.89
  IBIUNA CS 330/-220 MVAr IBIUNA CS2 SP RB FT CS 330/-220 MVAr IBIUNA CS2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,009,035.89
  IBIUNA CS 330/-220 MVAr IBIUNA CS1 SP RB FT CS 330/-220 MVAr IBIUNA CS1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,009,035.89
  IBIUNA CV 600/600 kV IBIUNA CV1 SP DIT   062/2001 IPCA RMEL REA 7831/2019 28/10/2021 28/10/2056 5,412,877.30
  IBIUNA TR 500/345 kV IBIUNA ATR2 SP RB FT TR 500/345 kV IBIUNA ATR2 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 7,016,695.06
  IBIUNA TR 500/345 kV IBIUNA ATR1 SP RB FT TR 500/345 kV IBIUNA ATR1 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 7,016,695.06
  IBIUNA TR 500/345 kV IBIUNA ATR3 SP RB FT TR 500/345 kV IBIUNA ATR3 SP 034/2001 IGPM RBNI REA 3744/2012 9/12/2015 9/12/2050 7,068,531.52
  IBIUNA CV 600/600 kV IBIUNA CV8 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  IBIUNA CV 600/600 kV IBIUNA CV7 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  IBIUNA CV 600/600 kV IBIUNA CV6 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  IBIUNA CV 600/600 kV IBIUNA CV5 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  IBIUNA CV 600/600 kV IBIUNA CV4 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  IBIUNA CV 600/600 kV IBIUNA CV3 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  IBIUNA CV 600/600 kV IBIUNA CV2 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  IBIUNA CV 600/600 kV IBIUNA CV1 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,083,783.69
  IBIUNA CR 500 kV 382 MVAr IBIUNA BC2B SP RB FT CR 500 kV 382 MVAr IBIUNA BC2A SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 12,277,991.17

 

185 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  IBIUNA CR 500 kV 382 MVAr IBIUNA BC2A SP RB FT CR 500 kV 382 MVAr IBIUNA BC2A SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 12,277,991.17
  IBIUNA CR 500 kV 382 MVAr IBIUNA BC1B SP RB FT CR 500 kV 382 MVAr IBIUNA BC1A SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 12,277,991.17
  IBIUNA CR 500 kV 382 MVAr IBIUNA BC1A SP RB FT CR 500 kV 382 MVAr IBIUNA BC1A SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 12,277,991.17
  IBIUNA MG 500 kV IBIUNA MG1 SP RB FT MG 500 kV IBIUNA MG1 SP 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 12,886,245.48
  IMBARIE EL 138 kV IMBARIE  DIST1 DIT   062/2001 IPCA RMEL REN 443/2011 28/01/2017 27/01/2040 4,705.67
  IMBARIE EL 138 kV IMBARIE  DIST1 DIT   062/2001 IPCA RMEL REN 443/2011 28/01/2017 27/01/2040 4,705.67
  IMBARIE EL 138 kV IMBARIE  DIST1 DIT   062/2001 IPCA RMEL REN 443/2011 28/01/2017 27/01/2040 4,705.67
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2040 4,718.16
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2040 4,718.16
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2040 4,718.16
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 2/4/2017 1/4/2040 4,724.12
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 2/4/2017 1/4/2040 4,724.12
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 2/4/2017 1/4/2040 4,724.12
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2046 26,639.58
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2046 26,639.58
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 2/4/2017 1/4/2046 26,670.33
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 2/4/2017 1/4/2046 26,670.33
  IMBARIE EL 138 kV IMBARIE  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2046 26,712.41
  IMBARIE EL 138 kV IMBARIE  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2046 26,712.41
  IMBARIE EL 138 kV IMBARIE  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2046 26,712.41
  IMBARIE IB 138 kV MG 138 kV IMBARIE MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 443/2011 26/04/2017 25/04/2046 27,535.48
  IMBARIE IB 138 kV MG 138 kV IMBARIE MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 443/2011 26/04/2017 25/04/2046 27,535.48
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2046 38,608.11
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 2/4/2017 1/4/2046 38,652.66
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 8/8/2014 7/8/2038 53,405.32
  IMBARIE EL 138 kV IMBARIE  DIST1 DIT   062/2001 IPCA RMEL REN 643/2014 24/01/2016 23/01/2044 63,537.16
  IMBARIE IB 138 kV MG 138 kV IMBARIE MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,442.16
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2049 109,149.99
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 2/4/2017 1/4/2049 109,269.90
  IMBARIE EL 138 kV IMBARIE  DIST3 DIT   062/2001 IPCA RMEL REN 443/2011 23/04/2017 22/04/2049 109,428.53
  IMBARIE IB 138 kV MG 138 kV IMBARIE MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 443/2011 26/04/2017 25/04/2049 114,607.73
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  IMBARIE EL 138 kV IMBARIE  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  IMBARIE EL 138 kV IMBARIE  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  IMBARIE EL 138 kV IMBARIE  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  IMBARIE EL 138 kV IMBARIE  DIST1 DIT   062/2001 IPCA RMEL REN 643/2014 31/01/2016 30/01/2046 132,454.89
  IMBARIE EL 138 kV IMBARIE LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 19/12/2016 18/12/2046 213,921.28
  IMBARIE EL 138 kV IMBARIE  DIST2 DIT   062/2001 IPCA RMEL REN 643/2014 21/11/2016 20/11/2047 236,715.38
  IMBARIE MG 138 kV IMBARIE MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 247,639.84
  IRIRI MG 138 kV IRIRI MG1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 4,508.33
  IRIRI IB 138 kV MG 138 kV IRIRI MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  IRIRI EL 138 kV IRIRI LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 133,881.23
  IRIRI EL 138 kV IRIRI LT 138 kV CAMPOS /IRIRI C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 133,881.23
  IRIRI EL 138 kV IRIRI  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 133,881.23
  IRIRI EL 138 kV IRIRI  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 133,881.23
  IRIRI EL 138 kV IRIRI  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 133,881.23
  IRIRI MG 138 kV IRIRI MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 238,913.23
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 8,422.39
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 8,422.39
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 8,422.39
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 8,422.39
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBNI REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBNI REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBNI REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBNI REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBNI REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBNI REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 11,158.51
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 11,173.43
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 11,173.43
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 11,188.34
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBNI REA 5861/2016 7/12/2017 6/12/2037 12,420.08
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBNI REA 5861/2016 18/04/2018 17/04/2038 12,549.38
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 12,653.95
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 12,653.95
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 12,653.95
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 12,653.95
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 12,653.95
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 12,653.95
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RMEL REN 443/2011 20/06/2016 19/06/2029 22,346.85
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 23,324.35
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBNI REA 5822/2016 1/8/2019 1/8/2050 191,191.47
  ITABERA MC 750 kV RTB 750 kV 329 Mvar ITABERA RT1 SP RB FT RTB 750 kV 329 Mvar ITABERA RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,519.15
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  ITABERA IB 750 kV MG 750 kV ITABERA MG1 SP IB4 RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  ITABERA IB 750 kV MG 750 kV ITABERA MG1 SP IB3 RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  ITABERA IB 750 kV MG 750 kV ITABERA MG1 SP IB2 RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  ITABERA IB 750 kV MG 750 kV ITABERA MG1 SP IB1 RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV3 SP RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 809,093.83

 

186 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  ITABERA RTL 750 kV 329 Mvar ITABERA RIV2 SP RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 809,093.83
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV1 SP RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 809,093.83
  ITABERA RTB 750 kV 329 Mvar ITABERA RT1 SP RB FT RTB 750 kV 329 Mvar ITABERA RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 809,093.83
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 982,396.56
  ITABERA RTB 750 kV 110 Mvar ITABERA RTR 2 SP RB FT RTB 750 kV 110 Mvar ITABERA RTR 2 SP 062/2001 IPCA RBNI REA 5822/2016 1/8/2019 1/8/2055 1,365,638.99
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,371,096.78
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,371,096.78
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,371,096.78
  ITABERA CR 750 kV 621 Mvar ITABERA BC3B SP RB FT CR 750 kV 621 Mvar ITABERA BC3B SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,420,140.71
  ITABERA CR 750 kV 621 Mvar ITABERA BC3A SP RB FT CR 750 kV 621 Mvar ITABERA BC3A SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,420,140.71
  ITABERA CR 750 kV 621 Mvar ITABERA BC2B SP RB FT CR 750 kV 621 Mvar ITABERA BC2B SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,420,140.71
  ITABERA CR 750 kV 621 Mvar ITABERA BC2A SP RB FT CR 750 kV 621 Mvar ITABERA BC2A SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,420,140.71
  ITABERA CR 750 kV 621 Mvar ITABERA BC1B SP RB FT CR 750 kV 621 Mvar ITABERA BC1B SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,420,140.71
  ITABERA CR 750 kV 621 Mvar ITABERA BC1A SP RB FT CR 750 kV 621 Mvar ITABERA BC1A SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,420,140.71
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV3 SP RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,927,621.82
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV2 SP RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,927,621.82
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV1 SP RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,927,621.82
  ITABERA RTB 750 kV 329 Mvar ITABERA RT1 SP RB FT RTB 750 kV 329 Mvar ITABERA RT1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,927,621.82
  ITABERA MG 750 kV ITABERA MG1 SP RB FT MG 750 kV ITABERA MG1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,340,506.12
  ITABERA MC 765 kV RTB 765 kV 330 Mvar ITABERA RT2 SP RB FT RTB 765 kV 330 Mvar ITABERA RT2 SP 062/2001 IPCA RBNI REA 5822/2016 1/8/2019 1/8/2048 2,614,446.87
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,639,485.04
  ITABERA EL 750 kV ITABERA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,639,485.04
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV3 SP RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,710,845.97
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV2 SP RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,710,845.97
  ITABERA RTL 750 kV 329 Mvar ITABERA RIV1 SP RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,710,845.97
  ITABERA RTB 750 kV 329 Mvar ITABERA RT1 SP RB FT RTB 750 kV 329 Mvar ITABERA RT1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,710,845.97
  ITABERA RTB 765 kV 330 Mvar ITABERA RT2 SP RB FT RTB 765 kV 330 Mvar ITABERA RT2 SP 062/2001 IPCA RBNI REA 5822/2016 1/8/2019 1/8/2055 4,096,916.96
  ITAPETI EL 345 kV ITAPETI LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 2,192,800.91
  ITAPETI EL 345 kV ITAPETI LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 2,192,800.91
  ITAPETI EL 345 kV ITAPETI LT 345 kV ITAPETI /NORDESTE C-1 SP RB FT LT 345 kV ITAPETI /NORDESTE C-1 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 2,192,800.91
  ITATIBA EL 500 kV ITATIBA LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBNI REA 6605/2017 1/7/2018 17/06/2041 254,970.56
  ITATIBA EL 500 kV ITATIBA LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBNI REA 6605/2017 1/7/2018 17/06/2041 254,970.56
  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 781.52
  ITUMBIARA TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RMEL REN 643/2014 26/07/2015 25/07/2044 3,976.23
  ITUMBIARA TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RMEL REN 643/2014 10/8/2015 9/8/2044 3,980.99
  ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCL MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 5,314.99
  ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 5,314.99
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 5,314.99
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 5,314.99
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 5,314.99
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 5,314.99
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 5,314.99
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 5,314.99
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 7,009.69
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 7,009.69
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2044 7,009.69
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034 10,550.48
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034 10,550.48
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034 10,550.48
  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2031 11,553.44
  ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RBNI REA 5861/2016 10/2/2021 9/2/2036 12,047.92
  ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 12,047.92
  ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RBNI REA 4347/2013 9/4/2018 8/4/2033 17,146.24
  ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RBNI REA 4347/2013 9/4/2018 8/4/2033 17,146.24
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RMEL REN 643/2014 31/01/2015 30/01/2036 22,087.61
  ITUMBIARA MC 230 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RMEL REN 643/2014 26/07/2015 25/07/2036 22,438.36
  ITUMBIARA MC 230 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RMEL REN 643/2014 10/8/2015 9/8/2036 22,460.50
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RMEL REN 643/2014 30/01/2016 29/01/2038 22,789.60
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RMEL REN 443/2011 5/5/2014 4/5/2034 31,579.91
  ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCL MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 6/5/2014 5/5/2034 31,583.50
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 6/5/2014 5/5/2034 31,583.50
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RMEL REN 443/2011 3/10/2014 2/10/2035 32,041.31
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RMEL REN 443/2011 7/12/2014 6/12/2035 32,236.75
  ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RMEL REN 643/2014 26/07/2015 25/07/2036 32,909.07
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RMEL REN 643/2014 10/8/2015 9/8/2036 32,941.55
  ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 4068/2013 22/11/2015 21/11/2043 37,748.51
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4068/2013 22/11/2015 21/11/2043 38,048.55
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4068/2013 23/11/2015 22/11/2043 38,051.65
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4068/2013 24/11/2015 23/11/2043 38,054.76
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4068/2013 28/11/2015 27/11/2043 38,067.15
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4068/2013 5/12/2015 4/12/2043 38,074.80
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4068/2013 6/12/2015 5/12/2043 38,077.90
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4068/2013 7/12/2015 6/12/2043 38,080.99
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4068/2013 9/12/2015 8/12/2043 38,087.16
  ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 4068/2013 24/06/2016 23/06/2044 38,301.19
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4068/2013 4/5/2016 3/5/2044 38,465.65
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4068/2013 4/5/2016 3/5/2044 38,465.65
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4068/2013 4/5/2016 3/5/2044 38,465.65
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4068/2013 4/5/2016 3/5/2044 38,465.65
  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 8314/2019 11/2/2021 10/2/2036 39,875.63
  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 8314/2019 11/2/2021 10/2/2036 39,875.63
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 4068/2013 30/01/2016 29/01/2044 40,321.11
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 4068/2013 4/2/2016 3/2/2044 40,322.14
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 4068/2013 4/2/2016 3/2/2044 40,322.14
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 4068/2013 4/2/2016 3/2/2044 40,322.14
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 4068/2013 31/01/2016 30/01/2044 40,324.36

 

187 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 5861/2016 13/09/2017 12/9/2033 44,649.82
  ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RMEL REN 443/2011 15/09/2014 14/09/2034 45,362.96
  ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RMEL REN 443/2011 3/10/2014 2/10/2035 45,430.87
  ITUMBIARA RTL 500 kV 111 Mvar ITUMBIARA RTEBIM MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RMEL REN 443/2011 15/10/2014 14/10/2035 45,490.48
  ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RMEL REN 443/2011 15/10/2014 14/10/2035 45,490.48
  ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RMEL REN 443/2011 7/12/2014 6/12/2035 45,708.01
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG2 MG DIT   062/2001 IPCA RMEL REN 643/2014 18/01/2015 17/01/2036 45,891.57
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG6 MG DIT   062/2001 IPCA RMEL REN 643/2014 5/3/2015 4/3/2036 46,069.35
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG1 MG DIT   062/2001 IPCA RMEL REN 643/2014 31/03/2015 30/03/2036 46,195.96
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG4 MG DIT   062/2001 IPCA RMEL REN 643/2014 23/04/2015 22/04/2036 46,283.34
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG5 MG DIT   062/2001 IPCA RMEL REN 643/2014 28/04/2015 27/04/2036 46,307.59
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG3 MG DIT   062/2001 IPCA RMEL REN 643/2014 15/10/2015 14/10/2037 46,969.04
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 4068/2013 23/11/2015 22/11/2043 55,147.33
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBNI REA 4068/2013 8/12/2015 7/12/2043 55,194.31
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 4068/2013 4/5/2016 3/5/2044 55,747.33
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 4068/2013 4/2/2016 3/2/2044 81,503.29
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBNI REA 4068/2013 24/06/2016 23/06/2044 82,294.68
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBNI REA 4068/2013 24/06/2016 23/06/2044 82,294.68
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 2040/2009 30/04/2012 29/04/2034 85,951.18
  ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBNI REA 5861/2016 13/03/2021 12/3/2036 98,056.18
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBNI REA 5861/2016 13/03/2021 12/3/2036 98,056.18
  ITUMBIARA IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,374.64
  ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBNI REA 5861/2016 10/4/2021 9/4/2036 106,585.36
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBNI REA 5861/2016 10/4/2021 9/4/2036 106,585.36
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBNI REA 5861/2016 23/07/2021 22/07/2036 112,707.73
  ITUMBIARA MC 230 kV TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBNI REA 5861/2016 23/07/2021 22/07/2036 112,707.73
  ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBNI REA 5861/2016 7/5/2021 6/5/2036 112,924.28
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBNI REA 5861/2016 7/5/2021 6/5/2036 112,924.28
  ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 5861/2016 30/11/2020 29/11/2035 114,026.41
  ITUMBIARA MC 230 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 5861/2016 30/11/2020 29/11/2035 114,026.41
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBNI REA 1814/2009 14/05/2012 13/05/2039 119,456.42
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RBNI REA 1814/2009 10/7/2012 9/7/2039 120,067.87
  ITUMBIARA MC 230 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  ITUMBIARA MC 230 kV TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  ITUMBIARA MC 230 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 4326/2013 28/12/2016 27/12/2042 130,467.38
  ITUMBIARA MC 230 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 1814/2009 12/2/2012 11/2/2039 133,259.36
  ITUMBIARA MC 230 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 1814/2009 15/04/2012 14/04/2039 134,035.24
  ITUMBIARA IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 1814/2009 4/4/2012 3/4/2039 137,486.41
  ITUMBIARA CR 230 kV 33,9 Mvar ITUMBIARA BC1 MG RB FT CR 230 kV 33,9 Mvar ITUMBIARA BC1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 143,624.38
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 5861/2016 19/12/2020 18/12/2035 146,416.30
  ITUMBIARA MC 230 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 5861/2016 19/12/2020 18/12/2035 146,416.30
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBNI REA 1814/2009 5/3/2012 4/3/2039 168,646.24
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 1814/2009 31/05/2012 30/05/2039 169,998.45
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG RB FT LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBNI REA 1814/2009 23/03/2012 22/03/2039 179,534.51
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBNI REA 1814/2009 22/01/2012 21/01/2039 190,290.68
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBNI REA 1814/2009 12/2/2012 11/2/2039 190,661.56
  ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 1814/2009 15/04/2012 14/04/2039 191,771.68
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBNI REA 5861/2016 21/01/2021 20/01/2036 193,190.79
  ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB2 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  ITUMBIARA IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 246,284.42
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  ITUMBIARA MC 345 kV TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBNI REA 4068/2013 24/06/2016 23/06/2044 285,863.00
  ITUMBIARA MC 230 kV TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 299,735.38
  ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG6 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG5 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG4 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG3 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG2 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  ITUMBIARA MC 500 kV TR 13,8/500 kV ITUMBIARA TRG1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  ITUMBIARA IB 500 kV MG 500 kV ITUMBIARA MG1 MG IB3 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  ITUMBIARA IB 500 kV MG 500 kV ITUMBIARA MG1 MG IB2 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  ITUMBIARA EL 500 kV ITUMBIARA LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  ITUMBIARA CR 230 kV 183 Mvar ITUMBIARA BC2 MG RB FT CR 230 kV 183 Mvar ITUMBIARA BC2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 401,040.55
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG RB FT LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 418,034.07
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 418,034.07
  ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCL MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REA 9185/2020 26/10/2020 26/10/2054 463,582.99
  ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCL MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 465,790.76

 

188 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB2 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 469,392.83
  ITUMBIARA IB 230 kV MG 500 kV ITUMBIARA MG1 MG IB1 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 474,119.73
  ITUMBIARA TR 345/230 kV ITUMBIARA TR2 MG RB FT TR 345/230 kV ITUMBIARA TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 479,205.44
  ITUMBIARA TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 479,205.44
  ITUMBIARA TR  345/230  kV ITUMBIARA      TR1 MG RB FT TR  345/230  kV ITUMBIARA      TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 479,205.44
  ITUMBIARA TR 500/345 kV ITUMBIARA TRR1 MG RB FT TR 500/345 kV ITUMBIARA TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 496,318.00
  ITUMBIARA MC 345 kV TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  ITUMBIARA RTL 500 kV 111 Mvar ITUMBIARA RTEBIM MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RMEL REA 9185/2020 26/10/2020 26/10/2054 642,728.94
  ITUMBIARA MC 500 kV TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  ITUMBIARA EL 230 kV ITUMBIARA LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG RB FT LT 230 kV PARANAIBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 804,753.31
  ITUMBIARA IB 345 kV MG 500 kV ITUMBIARA MG1 MG IB2 RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 903,623.56
  ITUMBIARA MC 345 kV TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCL MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,109,721.03
  ITUMBIARA TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,141,680.76
  ITUMBIARA TR 500/345 kV ITUMBIARA TRR1 MG RB FT TR 500/345 kV ITUMBIARA TRR1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,182,450.51
  ITUMBIARA EL 345 kV ITUMBIARA LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,196,446.96
  ITUMBIARA RTL 500 kV 111 Mvar ITUMBIARA RTEBIM MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,295,380.83
  ITUMBIARA TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,488,086.24
  ITUMBIARA TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,488,086.24
  ITUMBIARA TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,488,086.24
  ITUMBIARA TR 345/230 kV ITUMBIARA TRR4 MG RB FT TR 345/230 kV ITUMBIARA TRR4 MG 062/2001 IPCA RBNI REA 4326/2013 28/12/2016 27/12/2049 1,558,738.88
  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,992,077.36
  ITUMBIARA RTL 345 kV 96 Mvar ITUMBIARA RTCL MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,136,313.12
  ITUMBIARA TR  345/230  kV ITUMBIARA      TR3 MG RB FT TR  345/230  kV ITUMBIARA      TR3 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,197,838.50
  ITUMBIARA RTL 500 kV 111 Mvar ITUMBIARA RTEBIM MG RB FT LT 500 kV EMBORCACAO /ITUMBIARA C-1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,493,724.99
  ITUMBIARA TR 500/345 kV ITUMBIARA TR53 MG RB FT TR 500/345 kV ITUMBIARA TR53 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,545,284.15
  ITUMBIARA TR 500/345 kV ITUMBIARA TR50 MG RB FT TR 500/345 kV ITUMBIARA TR50 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,545,284.15
  ITUMBIARA TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,545,284.15
  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,746,015.43
  ITUMBIARA TR 500/345 kV ITUMBIARA TR49 MG RB FT TR 500/345 kV ITUMBIARA TR49 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,824,991.92
  ITUMBIARA MG 500 kV ITUMBIARA MG1 MG RB FT MG 500 kV ITUMBIARA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 9,136,508.00
  ITUTINGA MG 345 kV ITUTINGA MG1 MG RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RMEL REN 443/2011 5/7/2016 4/7/2029 8,949.67
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2040 11,230.15
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2040 11,230.15
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2040 11,230.15
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2040 11,243.43
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2040 11,243.43
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2040 11,243.43
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2040 11,257.78
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2040 11,257.78
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2040 11,257.78
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 9/4/2017 8/4/2040 11,264.79
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 9/4/2017 8/4/2040 11,264.79
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 9/4/2017 8/4/2040 11,264.79
  ITUTINGA MG 345 kV ITUTINGA MG1 MG RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBNI REA 5952/2016 1/8/2019 1/8/2045 15,560.48
  ITUTINGA IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RMEL REN 443/2011 23/02/2017 22/02/2046 35,646.20
  ITUTINGA IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RMEL REN 443/2011 24/02/2017 23/02/2046 35,648.90
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2046 35,969.19
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2046 35,969.19
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2046 35,969.19
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2046 35,969.19
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2046 36,008.28
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2046 36,008.28
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2046 36,008.28
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2046 36,008.28
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2046 36,046.29
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2046 36,046.29
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2046 36,046.29
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 9/4/2017 8/4/2046 36,068.78
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 9/4/2017 8/4/2046 36,068.78
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 9/4/2017 8/4/2046 36,068.78
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 9/4/2017 8/4/2046 36,068.78
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 27/04/2017 26/04/2046 36,117.52
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RMEL REN 443/2011 20/02/2017 19/02/2046 52,129.27
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RMEL REN 443/2011 12/3/2017 11/3/2046 52,185.91
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RMEL REN 443/2011 26/03/2017 25/03/2046 52,240.99
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RMEL REN 443/2011 29/04/2017 28/04/2046 52,352.06
  ITUTINGA MG 345 kV ITUTINGA MG1 MG RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBNI REA 5952/2016 1/8/2019 1/8/2045 69,322.94
  ITUTINGA RTB 345 kV 20 MVAr ITUTINGA RTR1 MG RB FT RTB 345 kV 20 MVAr ITUTINGA RTR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,369.76
  ITUTINGA MC 345 kV RTB 345 kV 60 Mvar ITUTINGA RT1 MG RB FT RTB 345 kV 60 Mvar ITUTINGA RT1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 177,723.46
  ITUTINGA MG 345 kV ITUTINGA MG1 MG RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBNI REA 5952/2016 1/8/2019 1/8/2051 184,276.69
  ITUTINGA IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  ITUTINGA EL 345 kV ITUTINGA LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  ITUTINGA RTB 345 kV 60 Mvar ITUTINGA RT1 MG RB FT RTB 345 kV 60 Mvar ITUTINGA RT1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,109.29
  ITUTINGA IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 469,392.83
  ITUTINGA MG 345 kV ITUTINGA MG1 MG RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 603,595.08
  ITUTINGA RTB 345 kV 33 Mvar ITUTINGA RB2R MG RB FT RTB 345 kV 100 Mvar ITUTINGA RB2 MG 062/2001 IPCA RBNI REA 5952/2016 1/8/2019 1/8/2054 784,651.84
  ITUTINGA IB 345 kV MG 345 kV ITUTINGA MG1 MG IB1 RB FT MG 345 kV ITUTINGA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 903,623.56
  ITUTINGA MC 345 kV RTB 345 kV 100 Mvar ITUTINGA RB2 MG RB FT RTB 345 kV 100 Mvar ITUTINGA RB2 MG 062/2001 IPCA RBNI REA 5952/2016 1/8/2019 1/8/2045 1,017,044.19
  ITUTINGA RTB 345 kV 100 Mvar ITUTINGA RB2 MG RB FT RTB 345 kV 100 Mvar ITUTINGA RB2 MG 062/2001 IPCA RBNI REA 5952/2016 1/8/2019 1/8/2054 2,353,955.46
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 781.52

 

189 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2040 2,446.57
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2040 2,446.57
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2040 2,446.57
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RMEL REN 443/2011 21/01/2017 20/01/2040 2,446.79
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RMEL REN 443/2011 21/01/2017 20/01/2040 2,446.79
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RMEL REN 443/2011 21/01/2017 20/01/2040 2,446.79
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RMEL REN 443/2011 22/01/2017 21/01/2040 2,447.01
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RMEL REN 443/2011 22/01/2017 21/01/2040 2,447.01
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RMEL REN 443/2011 22/01/2017 21/01/2040 2,447.01
  IVAIPORA TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RMEL REN 443/2011 7/3/2017 6/3/2040 2,453.74
  IVAIPORA TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RMEL REN 443/2011 7/3/2017 6/3/2040 2,453.74
  IVAIPORA TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RMEL REN 443/2011 7/3/2017 6/3/2040 2,453.74
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 8,688.05
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 8,688.05
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 8,688.05
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 8,688.05
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBNI REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBNI REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBNI REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RCDM REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RCDM REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RCDM REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 12,441.56
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 12,441.56
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 12,441.56
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 12,441.56
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 12,441.56
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 12,441.56
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBNI REA 5861/2016 16/04/2018 15/04/2038 12,547.43
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8360/2019 13/04/2021 12/4/2051 21,192.15
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 21,809.59
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 443/2011 16/11/2015 15/11/2028 33,943.91
  IVAIPORA MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT3A PR RB FT RTB 69 kV 180 Mvar IVAIPORA RT3A PR 062/2001 IPCA RBNI REA 1266/2008 9/2/2012 8/2/2037 38,406.27
  IVAIPORA MC 69 kV RTB 69 kV 180 Mvar IVAIPORA RT3B PR RB FT RTB 69 kV 180 Mvar IVAIPORA RT3B PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT2C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT2B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT2A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  IVAIPORA MC 69 kV RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB1 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RMEL REN 643/2014 21/12/2016 20/12/2045 59,833.05
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RMEL REN 643/2014 28/11/2016 27/11/2045 62,291.37
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR3 PR RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RMEL REN 643/2014 2/12/2016 1/12/2045 68,311.82
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR3 PR RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RMEL REN 643/2014 9/12/2016 8/12/2045 68,320.03
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBNI REA 5484/2015 24/12/2018 23/12/2033 94,979.16
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RBNI REA 5484/2015 24/12/2018 23/12/2033 94,979.16
  IVAIPORA MC 750 kV RTB 750 kV 329 Mvar IVAIPORA RT7 PR RB FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR 062/2001 IPCA RBNI REA 5484/2015 16/05/2019 15/05/2034 126,223.06
  IVAIPORA RTB 69 kV 60 Mvar IVAIPORA RTR1 PR RB FT RTB 69 kV 60 Mvar IVAIPORA RTR1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 148,235.64
  IVAIPORA RTB 69 kV 180 Mvar IVAIPORA RT3B PR RB FT RTB 69 kV 180 Mvar IVAIPORA RT3B PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,714.88
  IVAIPORA RTB 69 kV 180 Mvar IVAIPORA RT3A PR RB FT RTB 69 kV 180 Mvar IVAIPORA RT3A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,714.88
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,714.88
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,714.88
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,714.88
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,714.88
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,714.88
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,714.88
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 291,202.98
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 291,202.98
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 291,202.98
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RMEL REN 643/2014 24/11/2016 23/11/2047 299,491.14
  IVAIPORA MC 500 kV TR 750/500 kV IVAIPORA TR3 PR RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 406,718.87
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 406,718.87
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 406,718.87
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 406,718.87
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 406,718.87
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 406,718.87
  IVAIPORA MC 750 kV RTB 750 kV 329 Mvar IVAIPORA RT7 PR RB FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 499,519.15
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR3 PR RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 506,862.26
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 506,862.26
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 506,862.26
  IVAIPORA TR 500/69 kV IVAIPORA TREGR1 PR RB FT TR 750/500 kV IVAIPORA TRR1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 575,485.17
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB6 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB5 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB4 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB3 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB2 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  IVAIPORA IB 750 kV MG 750 kV IVAIPORA MG1 PR IB1 RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 693,775.19
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 693,775.19

 

190 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 693,775.19
  IVAIPORA TR 750/500 kV IVAIPORA TRR1 PR RB FT TR 750/500 kV IVAIPORA TRR1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 768,429.41
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2C PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 782,970.53
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2B PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 782,970.53
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT2A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT2A PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 782,970.53
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1C PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1C PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 782,970.53
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1B PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1B PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 782,970.53
  IVAIPORA RTB 69 kV 180 MVAr IVAIPORA RT1A PR RB FT RTB 69 kV 180 MVAr IVAIPORA RT1A PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 782,970.53
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA3 PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 809,093.83
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA2 PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 809,093.83
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA1 PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 809,093.83
  IVAIPORA RTB 750 kV 329 Mvar IVAIPORA RT7 PR RB FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 809,093.83
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA2 PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RMEL REA 11449/2022 4/5/2022 4/5/2058 1,128,412.95
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,207,571.62
  IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC6B PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,220,082.11
  IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC6A PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,220,082.11
  IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC4B PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,220,082.11
  IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC4A PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,220,082.11
  IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC2B PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,220,082.11
  IVAIPORA CR 750 kV 508 Mvar IVAIPORA BC2A PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,220,082.11
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,247,885.63
  IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC5B PR RB FT CR 750 kV 528 Mvar IVAIPORA BC5A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,256,473.13
  IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC5A PR RB FT CR 750 kV 528 Mvar IVAIPORA BC5A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,256,473.13
  IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC3B PR RB FT CR 750 kV 528 Mvar IVAIPORA BC3A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,256,473.13
  IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC3A PR RB FT CR 750 kV 528 Mvar IVAIPORA BC3A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,256,473.13
  IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC1B PR RB FT CR 750 kV 528 Mvar IVAIPORA BC1A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,256,473.13
  IVAIPORA CR 750 kV 528 Mvar IVAIPORA BC1A PR RB FT CR 750 kV 528 Mvar IVAIPORA BC1A PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,256,473.13
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,335,579.85
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,335,579.85
  IVAIPORA RTL 750 kV 150 Mvar IVAIPORA RFI1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,335,579.85
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,371,096.78
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,371,096.78
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,371,096.78
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,371,096.78
  IVAIPORA TR 500/69 kV IVAIPORA TREG3 PR RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,726,455.52
  IVAIPORA TR 500/69 kV IVAIPORA TREG2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,726,455.52
  IVAIPORA TR 500/69 kV IVAIPORA TREG1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,726,455.52
  IVAIPORA TR 750/500 kV IVAIPORA TRR1 PR RB FT TR 750/500 kV IVAIPORA TRR1 PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,830,741.07
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA3 PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,927,621.82
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA2 PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,927,621.82
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA1 PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,927,621.82
  IVAIPORA RTB 750 kV 329 Mvar IVAIPORA RT7 PR RB FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,927,621.82
  IVAIPORA TR 750/500 kV IVAIPORA TR3 PR RB FT TR 750/500 kV IVAIPORA TR3 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,305,288.23
  IVAIPORA TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,305,288.23
  IVAIPORA TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,305,288.23
  IVAIPORA MC 750 kV TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,324,684.35
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,639,485.04
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 2,639,485.04
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 2,639,485.04
  IVAIPORA EL 750 kV IVAIPORA LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 2,639,485.04
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,973,019.31
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA3 PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,710,845.97
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA2 PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,710,845.97
  IVAIPORA RTL 750 kV 329 Mvar IVAIPORA RIA1 PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,710,845.97
  IVAIPORA RTB 750 kV 329 Mvar IVAIPORA RT7 PR RB FT RTB 750 kV 329 Mvar IVAIPORA RT7 PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,710,845.97
  IVAIPORA TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,492,223.21
  IVAIPORA TR 750/500 kV IVAIPORA TR1 PR RB FT TR 750/500 kV IVAIPORA TR1 PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,492,223.21
  IVAIPORA MG 750 kV IVAIPORA MG1 PR RB FT MG 750 kV IVAIPORA MG1 PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,723,330.47
  IVAIPORA TR 750/500 kV IVAIPORA TR2 PR RB FT TR 750/500 kV IVAIPORA TR2 PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 10,573,025.33
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 390.76
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 6/11/2014 5/11/2035 4,403.54
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 6/11/2014 5/11/2035 4,403.54
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 6/11/2014 5/11/2035 4,403.54
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 10/11/2014 9/11/2035 4,405.45
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035 4,409.75
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035 4,409.75
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 19/11/2014 18/11/2035 4,409.75
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 3/12/2014 2/12/2035 4,414.25
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 3/12/2014 2/12/2035 4,414.25
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 3/12/2014 2/12/2035 4,414.25
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 2/12/2014 1/12/2035 4,415.95
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 2/12/2014 1/12/2035 4,415.95
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 14/12/2014 13/12/2035 4,419.49
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 14/12/2014 13/12/2035 4,419.49
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 14/12/2014 13/12/2035 4,419.49
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 11/2/2015 10/2/2036 4,442.99
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 11/2/2015 10/2/2036 4,442.99
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 11/2/2015 10/2/2036 4,442.99
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 5/3/2015 4/3/2036 4,451.06
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 5/3/2015 4/3/2036 4,451.06
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RMEL REN 443/2011 5/10/2015 4/10/2028 8,732.00
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RMEL REN 443/2011 5/10/2015 4/10/2028 8,732.00
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035 10,521.04
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035 10,521.04
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035 10,521.04
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RMEL REN 443/2011 6/12/2015 5/12/2037 10,858.29

 

191 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RMEL REN 443/2011 6/12/2015 5/12/2037 10,858.29
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RMEL REN 443/2011 6/12/2015 5/12/2037 10,858.29
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 10/9/2015 9/9/2032 20,428.40
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 10/9/2015 9/9/2032 20,428.40
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBNI REA 5710/2016 18/09/2019 18/09/2052 22,223.49
  JACAREPAGUA EL 345 kV JACAREPAGUA LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ RB FT LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 24,585.22
  JACAREPAGUA EL 345 kV JACAREPAGUA LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 24,585.22
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 24,931.59
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 24,931.59
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 24,931.59
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 24,931.59
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RMEL REN 643/2014 7/12/2014 6/12/2041 25,204.38
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RMEL REN 643/2014 21/12/2014 20/12/2041 25,234.87
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RMEL REN 643/2014 8/2/2015 7/2/2042 25,325.23
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RMEL REN 643/2014 9/4/2015 8/4/2042 25,438.14
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ DIT   062/2001 IPCA RMEL REN 643/2014 10/4/2015 9/4/2042 25,440.30
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR3A RJ RBF FT TR 345/138 kV JACAREPAGUA TR3A RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 29,983.70
  JACAREPAGUA IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBNI REA 3578/2012 20/07/2015 19/07/2040 29,983.70
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RMEL REN 443/2011 15/07/2014 14/07/2034 31,147.76
  JACAREPAGUA EL 345 kV JACAREPAGUA LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ RB FT LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ 062/2001 IPCA RMEL REN 643/2014 12/7/2015 11/7/2036 32,183.38
  JACAREPAGUA MC 13,8 kV TR 345/138 kV JACAREPAGUA TR3A RJ RBF FT TR 345/138 kV JACAREPAGUA TR3A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 34,694.77
  JACAREPAGUA MC 13,8 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 34,694.77
  JACAREPAGUA MC 13,8 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 34,694.77
  JACAREPAGUA MC 13,8 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 34,694.77
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 22/02/2015 21/02/2042 36,219.32
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 26/07/2015 25/07/2042 36,630.46
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RMEL REN 443/2011 8/2/2015 7/2/2042 36,703.22
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ DIT   062/2001 IPCA RMEL REN 643/2014 12/4/2015 11/4/2042 36,876.23
  JACAREPAGUA MC 13,8 kV RTB 13,8 kV 30 MVAr JACAREPAGUA RT3 RJ RBF FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  JACAREPAGUA MC 13,8 kV RTB 13,8 kV 30 Mvar JACAREPAGUA RT2 RJ RBF FT RTB 13,8 kV 30 Mvar JACAREPAGUA RT2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  JACAREPAGUA MC 13,8 kV RTB 13,8 kV 30 MVAr JACAREPAGUA RT1 RJ RBF FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 25/01/2015 24/01/2042 49,879.08
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 1/3/2015 28/02/2042 50,012.53
  JACAREPAGUA IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  JACAREPAGUA IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  JACAREPAGUA IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  JACAREPAGUA IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 85,627.81
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 4/9/2019 4/9/2049 92,951.46
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 17/12/2018 17/12/2048 92,951.46
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 17/12/2018 17/12/2048 92,951.46
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR3A RJ RBF FT TR 345/138 kV JACAREPAGUA TR3A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  JACAREPAGUA IB 138 kV MG 345 kV JACAREPAGUA MG1 RJ IB3 DIT   062/2001 IPCA RCDM REA 3578/2012 10/9/2015 9/9/2042 95,846.60
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 96,237.90
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 8/3/2021 7/3/2054 96,258.37
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 8/3/2021 7/3/2054 96,258.37
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBNI REN 443/2011 13/12/2016 12/12/2044 106,043.14
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBNI REA 4347/2013 22/02/2017 21/02/2045 106,474.29
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RMEL REN 643/2014 22/03/2015 21/03/2042 109,468.10
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 10/9/2015 9/9/2042 126,332.04
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /MATO ALTO C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 10/9/2015 9/9/2045 129,274.03
  JACAREPAGUA RTB 13,8 kV 30 MVAr JACAREPAGUA RT3 RJ RBF FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT3 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,052.81
  JACAREPAGUA RTB 13,8 kV 30 MVAr JACAREPAGUA RT1 RJ RBF FT RTB 13,8 kV 30 MVAr JACAREPAGUA RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 134,052.81
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ZONA OESTE /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ZONA INDUSTR. C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /PALMARES C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /MATO ALTO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV GRAJAU /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ DIT   062/2001 IPCA RCDM REA 5710/2016 24/01/2019 24/01/2051 159,736.10
  JACAREPAGUA MC 138 kV BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RCDM REA 5710/2016 18/01/2019 18/01/2051 159,736.10
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 23/10/2019 23/10/2050 169,929.77
  JACAREPAGUA BC 138 kV 100 Mvar JACAREPAGUA BC1B RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 183,199.01
  JACAREPAGUA BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 183,199.01
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 194,973.65
  JACAREPAGUA IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 16/05/2019 16/05/2049 216,051.41
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV TERMINAL SUL /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 23/10/2019 23/10/2049 216,051.41
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR3A RJ RBF FT TR 345/138 kV JACAREPAGUA TR3A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 224,165.84
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 224,165.84

 

192 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBNI REA 5710/2016 9/10/2018 9/10/2049 228,710.34
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBNI REA 5710/2016 16/08/2019 16/08/2050 228,710.34
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TRR2 RJ RBF FT TR 345/138 kV JACAREPAGUA TRR2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 236,778.62
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV VILA VALQUEIR /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 11/1/2019 11/1/2050 244,819.69
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV GRAJAU /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 27/09/2018 27/09/2049 244,819.69
  JACAREPAGUA EL 345 kV JACAREPAGUA LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ RB FT LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  JACAREPAGUA EL 345 kV JACAREPAGUA LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV CASCADURA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 5710/2016 24/01/2019 24/01/2049 261,243.16
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 10/9/2015 9/9/2044 268,978.36
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV ITAPEBA /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 10/9/2015 9/9/2044 268,978.36
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /COSMOS C-1 RJ DIT   062/2001 IPCA RCDM REA 2837/2011 10/9/2015 9/9/2044 314,072.91
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TR3A RJ RBF FT TR 345/138 kV JACAREPAGUA TR3A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 358,301.10
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 431,539.47
  JACAREPAGUA MC 138 kV TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 431,539.47
  JACAREPAGUA BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 436,461.63
  JACAREPAGUA IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 469,392.83
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  JACAREPAGUA EL 138 kV JACAREPAGUA LT 138 kV JACAREPAGUA /ARI FRANCO C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 630,256.63
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,335.86
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TR2A RJ RBF FT TR 345/138 kV JACAREPAGUA TR2A RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,335.86
  JACAREPAGUA BC 138 kV 100 Mvar JACAREPAGUA BC1A RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 840,228.02
  JACAREPAGUA RTB 13,8 kV 30 Mvar JACAREPAGUA RT2 RJ RBF FT RTB 13,8 kV 30 Mvar JACAREPAGUA RT2 RJ 062/2001 IPCA RMEL REA 11449/2022 4/5/2022 4/5/2058 854,532.33
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 886,682.76
  JACAREPAGUA IB 345 kV MG 345 kV JACAREPAGUA MG1 RJ IB1 RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 903,623.56
  JACAREPAGUA EL 138 kV JACAREPAGUA  CURICICA I DIT   062/2001 IPCA RCDM REN 443/2011 13/12/2016 12/12/2046 950,954.73
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TRR1 RJ RBF FT TR 345/138 kV JACAREPAGUA TRR1 RJ 062/2001 IPCA RMEL REA 5457/2015 8/4/2016 7/4/2049 967,757.82
  JACAREPAGUA EL 138 kV JACAREPAGUA  CURICICA II DIT   062/2001 IPCA RCDM REN 443/2011 13/12/2016 12/12/2046 968,317.83
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  JACAREPAGUA MC 345 kV TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,692,336.36
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,112,473.20
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TR1B RJ RBF FT TR 345/138 kV JACAREPAGUA TR1B RJ 062/2001 IPCA RMEL REA 5457/2015 6/12/2015 5/12/2048 2,884,257.79
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TR1A RJ RBF FT TR 345/138 kV JACAREPAGUA TR1A RJ 062/2001 IPCA RMEL REA 5457/2015 27/03/2016 26/03/2049 2,901,890.36
  JACAREPAGUA TR 345/138 kV JACAREPAGUA TR2B RJ RBF FT TR 345/138 kV JACAREPAGUA TR2B RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,257,900.22
  JACAREPAGUA MG 345 kV JACAREPAGUA MG1 RJ RB FT MG 345 kV JACAREPAGUA MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,066,701.55
  L.C.BARRETO MG 500 kV L.C.BARRETO MG1 SP RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 3,888.24
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG 062/2001 IPCA RBNI REA 1814/2009 9/7/2012 8/7/2026 17,648.26
  L.C.BARRETO MG 500 kV L.C.BARRETO MG1 SP RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 5/7/2016 4/7/2029 19,501.89
  L.C.BARRETO MG 500 kV L.C.BARRETO MG1 SP RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 5/7/2016 4/7/2029 21,393.81
  L.C.BARRETO MG 500 kV L.C.BARRETO MG1 SP RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 5/7/2016 4/7/2029 30,619.60
  L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB2 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBNI REA 1814/2009 30/06/2012 29/06/2026 52,878.64
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBNI REA 3578/2012 27/04/2015 26/04/2042 73,433.92
  L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB3 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB2 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB1 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR6 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR5 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR4 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR3 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR2 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR1 SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV JAGUARA-US /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB1 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBNI REA 1814/2009 2/9/2012 1/9/2038 303,434.12
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBNI REA 1814/2009 8/2/2012 7/2/2037 398,060.74
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBNI REA 1814/2009 6/5/2012 5/5/2037 401,494.66
  L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB3 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 469,392.83
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR6 SP DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR5 SP DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR4 SP DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR3 SP DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR2 SP DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR1 SP DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  L.C.BARRETO EL 345 kV L.C.BARRETO LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  L.C.BARRETO IB 345 kV MG 500 kV L.C.BARRETO MG1 SP IB3 RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 903,623.56
  L.C.BARRETO MG 500 kV L.C.BARRETO MG1 SP RB FT MG 500 kV L.C.BARRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 988,403.25
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR5 SP DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR3 SP DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR2 SP DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  L.C.BARRETO MC 345 kV TR 13,8/345 kV L.C.BARRETO TR1 SP DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  LINHARES IB 138 kV MG 230 kV LINHARES MG1 ES IB1 DIT   006/2010 IPCA RPEC CC 006/2010 14/08/2018 12/7/2040 221,362.77
  LINHARES IB 230 kV MG 230 kV LINHARES MG1 ES IB1 RB FT MG 230 kV LINHARES MG1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/7/2040 296,496.88
  LINHARES MC 138 kV TR 230/138 kV LINHARES TR1 ES RBF FT TR 230/138 kV LINHARES TR1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/7/2040 313,335.03
  LINHARES TR 230/138 kV LINHARES TRR1 ES RBF FT TR 230/138 kV LINHARES TRR1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/7/2040 322,946.40
  LINHARES MC 230 kV TR 230/138 kV LINHARES TR1 ES RBF FT TR 230/138 kV LINHARES TR1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/7/2040 403,348.19
  LINHARES EL 138 kV LINHARES  DIST4 DIT   006/2010 IPCA RPEC CC 006/2010 14/08/2018 12/7/2040 441,522.64
  LINHARES EL 138 kV LINHARES  DIST3 DIT   006/2010 IPCA RPEC CC 006/2010 14/08/2018 12/7/2040 441,522.64
  LINHARES EL 138 kV LINHARES  DIST2 DIT   006/2010 IPCA RPEC CC 006/2010 14/08/2018 12/7/2040 441,522.64
  LINHARES EL 138 kV LINHARES  DIST1 DIT   006/2010 IPCA RPEC CC 006/2010 14/08/2018 12/7/2040 441,522.64
  LINHARES EL 230 kV LINHARES LT 230 kV U.MASCARENHAS /LINHARES C-1 ES RB FT LT 230 kV U.MASCARENHAS /LINHARES C-1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/7/2040 571,005.76

 

193 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LINHARES MG 230 kV LINHARES MG1 ES RB FT MG 230 kV LINHARES MG1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/7/2040 908,174.93
  LINHARES TR 230/138 kV LINHARES TR1 ES RBF FT TR 230/138 kV LINHARES TR1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/7/2040 968,837.22
  LT  138 kV JACUACANGA   /BRISAMAR      RJ LT 138 kV JACUACANGA /BRISAMAR C-1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 13/11/2015 12/11/2050 0.01
  LT  138 kV JACUACANGA   /BRISAMAR      RJ LT 138 kV JACUACANGA /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 551,465.52
  LT  138 kV JACUACANGA   /BRISAMAR      RJ LT 138 kV JACUACANGA /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,313,836.46
  LT  138 kV MURIQUI      /BRISAMAR      RJ LT 138 kV MURIQUI /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 214,816.39
  LT  138 kV SANTA CRUZ   /BRISAMAR      RJ LT 138 kV SANTA CRUZ /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 250,666.14
  LT  138 kV SANTA CRUZ   /BRISAMAR      RJ LT 138 kV SANTA CRUZ /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 597,198.39
  LT  230 kV ITUMBIARA    /C. DOURADA    MG/GO LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO RB FT LT 230 kV ITUMBIARA /C. DOURADA C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 623,835.52
  LT  345 kV CORUMBA      /ITUMBIARA     GO/MG LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,891,435.42
  LT  345 kV CORUMBA      /ITUMBIARA     GO/MG LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,506,241.52
  LT  345 kV CORUMBA      /ITUMBIARA     GO/MG LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG RB FT LT 345 kV CORUMBA /ITUMBIARA C-1 GO/MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 8,674,921.60
  LT  345 kV FURNAS       /M. MORAES     MG LT 345 kV FURNAS /M. MORAES C-1 MG RB FT LT 345 kV FURNAS /M. MORAES C-1 MG 062/2001 IPCA RBNI REA 2176/2009 7/12/2012 6/12/2040 36,522.61
  LT  345 kV FURNAS       /M. MORAES     MG LT 345 kV FURNAS /M. MORAES C-1 MG RB FT LT 345 kV FURNAS /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,489,990.94
  LT  345 kV ITUMBIARA    /P. COLOMBIA   MG LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,812,386.33
  LT  345 kV L.C.BARRETO  /VOLTA GRANDE  SP/MG LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /VOLTA GRANDE C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,077,399.93
  LT  345 kV MARIMBONDO   /P. COLOMBIA   MG LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG RB FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,843,550.98
  LT  345 kV P. COLOMBIA  /VOLTA GRANDE  MG LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,077,399.93
  LT  500 kV MARIMBONDO   /AGUA VERMELHA MG/SP LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP RB FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,952,594.77
  LT  500 kV MARIMBONDO   /AGUA VERMELHA MG/SP LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP RB FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 14,181,731.70
  LT 138 kV ADRIANOPOLIS /CEPEL RJ LT 138 kV ADRIANOPOLIS /CEPEL C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 15,052.18
  LT 138 kV ADRIANOPOLIS /CEPEL RJ LT 138 kV ADRIANOPOLIS /CEPEL C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 15,052.18
  LT 138 kV ADRIANOPOLIS /CEPEL RJ LT 138 kV ADRIANOPOLIS /CEPEL C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 35,861.00
  LT 138 kV ADRIANOPOLIS /CEPEL RJ LT 138 kV ADRIANOPOLIS /CEPEL C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 35,861.00
  LT 138 kV ADRIANOPOLIS /MAGE RJ LT 138 kV ADRIANOPOLIS /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 370,515.25
  LT 138 kV ADRIANOPOLIS /MAGE RJ LT 138 kV ADRIANOPOLIS /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 370,515.25
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 165,574.00
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 169,819.49
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 250,666.14
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 394,471.01
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 404,585.66
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 597,198.39
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 778,863.90
  LT 138 kV ALCANTARA /ADRIANOPOLIS RJ LT 138 kV ALCANTARA /ADRIANOPOLIS C-3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,149,660.79
  LT 138 kV ANGRA AMPLA /MURIQUI RJ LT 138 kV ANGRA AMPLA /MURIQUI C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 361,282.11
  LT 138 kV ANGRA FUR /ANGRA AMPLA RJ LT 138 kV ANGRA FUR /ANGRA AMPLA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 426,132.45
  LT 138 kV ANGRA FUR /JACUACANGA RJ LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 426,132.45
  LT 138 kV ANGRA FUR /JACUACANGA RJ LT 138 kV ANGRA FUR /JACUACANGA C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,015,237.26
  LT 138 kV ANGRA FUR /SANTA CRUZ RJ LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,203,197.50
  LT 138 kV ANGRA FUR /SANTA CRUZ RJ LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 2,866,552.27
  LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,025,260.04
  LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,315,997.26
  LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 2,442,626.00
  LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 3,135,291.55
  LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-2 SP/RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 4,702,275.49
  LT 138 kV C. PAULISTA /VOLTA REDONDA SP/RJ LT 138 kV C. PAULISTA /VOLTA REDONDA C-1 SP/RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 6,035,719.17
  LT 138 kV CAMPOS /C.ITAPEMIRIM RJ/ES LT 138 kV CAMPOS /C.ITAPEMIRIM C-2 RJ/ES DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 818,221.18
  LT 138 kV CAMPOS /C.ITAPEMIRIM RJ/ES LT 138 kV CAMPOS /C.ITAPEMIRIM C-1 RJ/ES DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 818,221.18
  LT 138 kV CAMPOS /IRIRI RJ LT 138 kV CAMPOS /IRIRI C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,215,730.80
  LT 138 kV CAMPOS /ROCHA LEAO RJ LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,378,663.80
  LT 138 kV IMBARIE /ADRIANOPOLIS RJ LT 138 kV IMBARIE /ADRIANOPOLIS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 225,599.53
  LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 193,334.75
  LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 193,334.75
  LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 460,609.47
  LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 460,609.47
  LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 886,714.81
  LT 138 kV IMBARIE /SAO JOSE RJ LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 886,714.81
  LT 138 kV IRIRI /ROCHA LEAO RJ LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 162,932.99
  LT 138 kV PARQUE EMAS /C. MAGALHAES GO/MT LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2046 17,397.79
  LT 138 kV PARQUE EMAS /C. MAGALHAES GO/MT LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 796,302.33
  LT 138 kV PARQUE EMAS /C. MAGALHAES GO/MT LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,897,146.78
  LT 138 kV RIO CLARO /PARQUE EMAS GO LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2046 17,397.79
  LT 138 kV RIO CLARO /PARQUE EMAS GO LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2046 17,397.79
  LT 138 kV RIO CLARO /PARQUE EMAS GO LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 853,878.11
  LT 138 kV RIO CLARO /PARQUE EMAS GO LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 2,034,317.93
  LT 138 kV RIO VERDE FUR /C. DOURADA GO LT 138 kV RIO VERDE FUR /C. DOURADA C-2 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 1,708,766.73
  LT 138 kV RIO VERDE FUR /C. DOURADA GO LT 138 kV RIO VERDE FUR /C. DOURADA C-2 GO DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 4,071,043.34
  LT 138 kV RIO VERDE FUR /RIO CLARO GO LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2046 17,397.79
  LT 138 kV RIO VERDE FUR /RIO CLARO GO LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 829,972.41
  LT 138 kV RIO VERDE FUR /RIO CLARO GO LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 1,977,363.91
  LT 138 kV ROCHA LEAO /MAGE RJ LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 833,659.32
  LT 138 kV ROCHA LEAO /MAGE RJ LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 833,659.32
  LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 355,077.12
  LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 355,077.12
  LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 845,951.83
  LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 845,951.83
  LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,628,533.61
  LT 138 kV SAO JOSE /MAGE RJ LT 138 kV SAO JOSE /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,628,533.61
  LT 138 kV USI CAMPOS /CAMPOS RJ LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,034.79
  LT 138 kV USI CAMPOS /CAMPOS RJ LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 10,034.79
  LT 138 kV USI CAMPOS /CAMPOS RJ LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 23,907.33
  LT 138 kV USI CAMPOS /CAMPOS RJ LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 23,907.33
  LT 138 kV USI CAMPOS /CAMPOS RJ LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 46,023.78
  LT 230 kV AGUAS LINDAS /BRAS. SUL GO/DF LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2039 8,859.60
  LT 230 kV AGUAS LINDAS /BRAS. SUL GO/DF LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 529,976.14
  LT 230 kV AGUAS LINDAS /BRAS. SUL GO/DF LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,262,639.18

 

194 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 230 kV AGUAS LINDAS /BRAS. SUL GO/DF LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF RB FT LT 230 kV AGUAS LINDAS /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,430,694.36
  LT 230 kV BARRO ALTO /AGUAS LINDAS GO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBNI REA 2367/2010 24/11/2013 23/11/2039 8,859.60
  LT 230 kV BARRO ALTO /AGUAS LINDAS GO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,801,918.86
  LT 230 kV BARRO ALTO /AGUAS LINDAS GO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,292,973.20
  LT 230 kV BARRO ALTO /AGUAS LINDAS GO LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO RB FT LT 230 kV BARRO ALTO /AGUAS LINDAS C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 8,264,360.83
  LT 230 kV BARRO ALTO /NIQUELANDIA GO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,536,930.79
  LT 230 kV BARRO ALTO /NIQUELANDIA GO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,661,653.61
  LT 230 kV BARRO ALTO /NIQUELANDIA GO LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO 028/2009 IPCA RBL CC 028/2009 1/7/2016 19/11/2039 5,318,842.03
  LT 230 kV BARRO ALTO /NIQUELANDIA GO LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,049,013.65
  LT 230 kV BRAS. GERAL /BRAS. SUL DF LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,178.05
  LT 230 kV BRAS. GERAL /BRAS. SUL DF LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF RB FT LT 230 kV BRAS. GERAL /BRAS. SUL C-1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 221,178.05
  LT 230 kV BRAS. SUL /PIRINEUS DF/GO LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO RB FT LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,517,054.56
  LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,863,972.16
  LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,949,040.64
  LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 6,823,257.13
  LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 7,025,928.14
  LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 13,135,385.74
  LT 230 kV ITUMBIARA /RIO VERDE FUR MG/GO LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 13,525,545.72
  LT 230 kV PIRINEUS /XAVANTES GO LT 230 kV PIRINEUS /XAVANTES C-1 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 706,634.85
  LT 230 kV PIRINEUS /XAVANTES GO LT 230 kV PIRINEUS /XAVANTES C-1 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,683,518.90
  LT 230 kV PIRINEUS /XAVANTES GO LT 230 kV PIRINEUS /XAVANTES C-1 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,240,925.81
  LT 230 kV PIRINEUS /XAVANTES GO LT 230 kV PIRINEUS /XAVANTES C-2 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-2 GO 014/2011 IPCA RBL CC 014/2011 8/6/2018 9/12/2041 4,232,920.21
  LT 230 kV RIO VERDE FUR /BARRA PEIXE GO/MT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,239,809.08
  LT 230 kV RIO VERDE FUR /BARRA PEIXE GO/MT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 10,101,113.41
  LT 230 kV RIO VERDE FUR /BARRA PEIXE GO/MT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 19,445,554.89
  LT 230 kV RIO VERDE FUR /C. DOURADA GO LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,481,164.00
  LT 230 kV RIO VERDE FUR /C. DOURADA GO LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,911,237.62
  LT 230 kV RIO VERDE FUR /C. DOURADA GO LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 11,379,665.87
  LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,402,739.20
  LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,643,766.56
  LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 8,106,840.16
  LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 8,681,074.67
  LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 15,606,398.90
  LT 230 kV RIO VERDE FUR /RONDONOPOLIS GO/MT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 16,711,852.16
  LT 230 kV S.DA MESA /NIQUELANDIA GO LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,488,698.40
  LT 230 kV S.DA MESA /NIQUELANDIA GO LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,546,742.57
  LT 230 kV S.DA MESA /NIQUELANDIA GO LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,827,799.52
  LT 230 kV S.DA MESA /NIQUELANDIA GO LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO 028/2009 IPCA RBL CC 028/2009 27/09/2017 19/11/2039 8,003,147.49
  LT 230 kV U.MASCARENHAS /LINHARES ES LT 230 kV U.MASCARENHAS /LINHARES C-1 ES RB FT LT 230 kV U.MASCARENHAS /LINHARES C-1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/7/2040 4,905,010.10
  LT 345 kV ADRIANOPOLIS /ITUTINGA RJ/MG LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-2 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,764,501.89
  LT 345 kV ADRIANOPOLIS /ITUTINGA RJ/MG LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG RB FT LT 345 kV ADRIANOPOLIS /ITUTINGA C-1 RJ/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,764,501.89
  LT 345 kV ADRIANOPOLIS /JACAREPAGUA RJ LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /JACAREPAGUA C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 909,804.38
  LT 345 kV ADRIANOPOLIS /MACAE MERCHAN RJ LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RMEL REN 443/2011 5/6/2017 4/6/2053 0.01
  LT 345 kV ADRIANOPOLIS /MACAE MERCHAN RJ LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,237,773.04
  LT 345 kV ADRIANOPOLIS /NOVA IGUACU RJ LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 311,248.87
  LT 345 kV ADRIANOPOLIS /VENDA PEDRAS RJ LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,561,817.60
  LT 345 kV ADRIANOPOLIS /VENDA PEDRAS RJ LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBNI REA 5538/2015 1/7/2016 31/12/2042 2,931,607.32
  LT 345 kV ADRIANOPOLIS /VENDA PEDRAS RJ LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 6,103,390.42
  LT 345 kV ATIBAIA 2 /MOGI CRUZES SP LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 3698/2012 18/09/2013 17/09/2045 152,375.98
  LT 345 kV ATIBAIA 2 /MOGI CRUZES SP LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 4420/2013 10/9/2013 31/12/2042 232,248.45
  LT 345 kV ATIBAIA 2 /MOGI CRUZES SP LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,442,106.50
  LT 345 kV ATIBAIA 2 /POCOS CALDAS SP/MG LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4420/2013 10/9/2013 31/12/2042 232,248.45
  LT 345 kV ATIBAIA 2 /POCOS CALDAS SP/MG LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,442,106.50
  LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,711,044.19
  LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,758,928.63
  LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 8,841,359.95
  LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 8,955,442.02
  LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 17,020,415.79
  LT 345 kV BANDEIRANTES /SAMAMBAIA GO/DF LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 17,240,034.06
  LT 345 kV BARREIRO 1 /PIMENTA MG LT 345 kV BARREIRO 1 /PIMENTA C-1 MG RB FT LT 345 kV BARREIRO 1 /PIMENTA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,740,559.67
  LT 345 kV BARRO BRANCO /OURO PRETO 2 MG LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG RB FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG 062/2001 IPCA RBNI REA 8920/2020 1/9/2017 31/08/2045 11,684.63
  LT 345 kV BARRO BRANCO /OURO PRETO 2 MG LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG RB FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,905,653.58
  LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 359,133.31
  LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 430,959.97
  LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 855,615.48
  LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,026,738.58
  LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,647,137.01
  LT 345 kV BRAS. SUL /SAMAMBAIA DF LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,976,564.41
  LT 345 kV CAMPINAS /GUARULHOS SP LT 345 kV CAMPINAS /GUARULHOS C-1 SP RB FT LT 345 kV CAMPINAS /GUARULHOS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,106,915.41
  LT 345 kV CAMPINAS /POCOS CALDAS SP/MG LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,016,719.79
  LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,130,857.63
  LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,130,857.63
  LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,076,651.84
  LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,076,651.84
  LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 9,773,012.94
  LT 345 kV CAMPOS /MACAE MERCHAN RJ LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ 006/2005 IGPM RBL CC 006/2005 2/6/2010 4/3/2035 27,006,868.46
  LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES 062/2001 IPCA RBNI DSP 1405/2022 1/7/2022 30/06/2056 58,163.39
  LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES 062/2001 IPCA RBNI DSP 1405/2022 1/7/2022 30/06/2056 58,163.39
  LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,849,124.25
  LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,849,124.25
  LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 6,787,882.80
  LT 345 kV CAMPOS /RIO NOVO DO SUL RJ/ES LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 6,787,882.80
  LT 345 kV CORUMBA /BRAS. SUL GO/DF LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,081,324.02
  LT 345 kV CORUMBA /BRAS. SUL GO/DF LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 14,488,422.12
  LT 345 kV CORUMBA /BRAS. SUL GO/DF LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF RB FT LT 345 kV CORUMBA /BRAS. SUL C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 27,891,520.07
  LT 345 kV ESTREITO /FURNAS MG LT 345 kV ESTREITO /FURNAS C-1 MG RB FT LT 345 kV ESTREITO /FURNAS C-1 MG 062/2001 IPCA RBNI REA 2176/2009 7/12/2012 6/12/2040 32,967.48

 

195 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 345 kV ESTREITO /FURNAS MG LT 345 kV ESTREITO /FURNAS C-1 MG RB FT LT 345 kV ESTREITO /FURNAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,681,528.70
  LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBNI REA 2176/2009 7/12/2012 6/12/2040 0.01
  LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBNI REA 2176/2009 7/12/2012 6/12/2040 130,578.70
  LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 632,074.62
  LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 632,074.62
  LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,505,883.24
  LT 345 kV ESTREITO /L.C.BARRETO MG/SP LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP RB FT LT 345 kV ESTREITO /L.C.BARRETO C-2 MG/SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,898,961.14
  LT 345 kV ESTREITO /M. MORAES MG LT 345 kV ESTREITO /M. MORAES C-1 MG RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBNI REA 2176/2009 7/12/2012 6/12/2040 29,629.78
  LT 345 kV ESTREITO /M. MORAES MG LT 345 kV ESTREITO /M. MORAES C-1 MG RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 373,498.64
  LT 345 kV FURNAS /ITUTINGA MG LT 345 kV FURNAS /ITUTINGA C-1 MG RB FT LT 345 kV FURNAS /ITUTINGA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,740,559.67
  LT 345 kV FURNAS /ITUTINGA MG LT 345 kV FURNAS /ITUTINGA C-2 MG RB FT LT 345 kV FURNAS /ITUTINGA C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,764,501.89
  LT 345 kV FURNAS /PIMENTA MG LT 345 kV FURNAS /PIMENTA C-1 MG RB FT LT 345 kV FURNAS /PIMENTA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,580,186.56
  LT 345 kV FURNAS /POCOS CALDAS MG LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,136,430.89
  LT 345 kV FURNAS /POCOS CALDAS MG LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,136,430.89
  LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,521,592.97
  LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,521,592.97
  LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,625,112.09
  LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,625,112.09
  LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-2 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,978,667.92
  LT 345 kV GUARULHOS /IBIUNA SP LT 345 kV GUARULHOS /IBIUNA C-1 SP RB FT LT 345 kV GUARULHOS /IBIUNA C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,978,667.92
  LT 345 kV GUARULHOS /NORDESTE SP LT 345 kV GUARULHOS /NORDESTE C-1 SP RB FT LT 345 kV GUARULHOS /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 790,093.28
  LT 345 kV GUARULHOS /POCOS CALDAS SP/MG LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,357,484.14
  LT 345 kV GUARULHOS /POCOS CALDAS SP/MG LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,405,368.58
  LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBNI REA 1410/2008 4/11/2015 3/11/2055 139,762.62
  LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,967,926.91
  LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,967,926.91
  LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,688,478.30
  LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,688,478.30
  LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 9,025,743.84
  LT 345 kV IBIUNA /TIJUCO PRETO SP LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 9,025,743.84
  LT 345 kV ITAPETI /NORDESTE SP LT 345 kV ITAPETI /NORDESTE C-1 SP RB FT LT 345 kV ITAPETI /NORDESTE C-1 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 5,701,405.51
  LT 345 kV ITAPETI /TIJUCO PRETO SP LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 2,922,918.44
  LT 345 kV ITAPETI /TIJUCO PRETO SP LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 2,922,918.44
  LT 345 kV ITUMBIARA /BANDEIRANTES MG/GO LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,309,599.70
  LT 345 kV ITUMBIARA /BANDEIRANTES MG/GO LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,309,599.70
  LT 345 kV ITUMBIARA /BANDEIRANTES MG/GO LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO RB FT LT 345 kV ITUMBIARA /BANDEIRANTES C-2 MG/GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 10,267,385.75
  LT 345 kV L.C.BARRETO /POCOS CALDAS SP/MG LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,716,617.45
  LT 345 kV L.C.BARRETO /POCOS CALDAS SP/MG LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,740,559.67
  LT 345 kV MACAE MERCHAN /VENDA PEDRAS RJ LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,920,950.91
  LT 345 kV MACAE MERCHAN /VENDA PEDRAS RJ LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBNI REA 5538/2015 1/7/2016 31/12/2042 2,931,607.32
  LT 345 kV MACAE MERCHAN /VENDA PEDRAS RJ LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 6,959,005.90
  LT 345 kV MOGI CRUZES /NORDESTE SP LT 345 kV MOGI CRUZES /NORDESTE C-1 SP RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 526,728.85
  LT 345 kV NOVA IGUACU /JACAREPAGUA RJ LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ RB FT LT 345 kV NOVA IGUACU /JACAREPAGUA C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 598,555.51
  LT 345 kV PADRE FIALHO /BARRO BRANCO MG LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG RB FT LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG 062/2001 IPCA RBNI REA 8920/2020 1/9/2017 31/08/2045 11,684.63
  LT 345 kV PADRE FIALHO /BARRO BRANCO MG LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG RB FT LT 345 kV PADRE FIALHO /BARRO BRANCO C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,905,653.58
  LT 345 kV RIO NOVO DO SUL /VIANA ES LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES 062/2001 IPCA RBNI DSP 1405/2022 1/7/2022 30/06/2056 58,163.39
  LT 345 kV RIO NOVO DO SUL /VIANA ES LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,915,377.65
  LT 345 kV RIO NOVO DO SUL /VIANA ES LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,563,282.56
  LT 345 kV RIO NOVO DO SUL /VITORIA ES LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RBNI DSP 1405/2022 1/7/2022 30/06/2056 58,163.39
  LT 345 kV RIO NOVO DO SUL /VITORIA ES LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,513,933.16
  LT 345 kV RIO NOVO DO SUL /VITORIA ES LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,989,308.35
  LT 345 kV VIANA /VITORIA ES LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 684,747.51
  LT 345 kV VIANA /VITORIA ES LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,631,373.51
  LT 345 kV VITORIA /PADRE FIALHO ES/MG LT 345 kV VITORIA /PADRE FIALHO C-1 ES/MG RB FT LT 345 kV VITORIA /PADRE FIALHO C-1 ES/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,358,563.32
  LT 500 kV ADRIANOPOLIS /C. PAULISTA RJ/SP LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP RB FT LT 500 kV ADRIANOPOLIS /C. PAULISTA C-3 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,142,939.37
  LT 500 kV ADRIANOPOLIS /GRAJAU RJ LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,297,929.33
  LT 500 kV ADRIANOPOLIS /GRAJAU RJ LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,474,691.04
  LT 500 kV ADRIANOPOLIS /SAO JOSE RJ LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,378,757.60
  LT 500 kV ADRIANOPOLIS /SAO JOSE RJ LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,284,814.62
  LT 500 kV ADRIANOPOLIS /SAO JOSE RJ LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,323,564.58
  LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2021 30/06/2057 36,177.83
  LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2057 36,177.83
  LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,038,243.27
  LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,038,243.27
  LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,473,557.85
  LT 500 kV ADRIANOPOLIS /TERMINAL RIO RJ LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,761,822.09
  LT 500 kV ANGRA FUR /C. PAULISTA RJ/SP LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,564,635.24
  LT 500 kV ANGRA FUR /C. PAULISTA RJ/SP LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV ANGRA FUR /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 8,492,548.64
  LT 500 kV ANGRA FUR /NOVA IGUACU RJ LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,806,892.00
  LT 500 kV ANGRA FUR /NOVA IGUACU RJ LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 9,069,712.13
  LT 500 kV ANGRA FUR /NOVA IGUACU RJ LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ RB FT LT 500 kV ANGRA FUR /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 17,460,014.35
  LT 500 kV ANGRA FUR /ZONA OESTE RJ LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 3,010,905.49
  LT 500 kV ANGRA FUR /ZONA OESTE RJ LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 7,173,317.78
  LT 500 kV ANGRA FUR /ZONA OESTE RJ LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ RB FT LT 500 kV ANGRA FUR /ZONA OESTE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 13,809,284.07
  LT 500 kV ARARAQUARA FURNAS /CAMPINAS SP LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RMEL REN 443/2011 31/08/2017 30/08/2047 150,693.90
  LT 500 kV ARARAQUARA FURNAS /CAMPINAS SP LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,917,986.66
  LT 500 kV ARARAQUARA FURNAS /CAMPINAS SP LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP RB FT LT 500 kV ARARAQUARA FURNAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 14,099,279.77
  LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS SP/MG LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,091,027.21
  LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS SP/MG LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 14,511,539.42
  LT 500 kV B.DESPACHO 3 /OURO PRETO 2 MG LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG RB FT LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039 11,138,072.74
  LT 500 kV C. PAULISTA /FERNAO DIAS SP LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,076,486.55
  LT 500 kV C. PAULISTA /FERNAO DIAS SP LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP RB FT LT 500 kV C. PAULISTA /FERNAO DIAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,947,115.71
  LT 500 kV C. PAULISTA /ITAJUBA 3 SP/MG LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG RB FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,834,229.78
  LT 500 kV C. PAULISTA /ITAJUBA 3 SP/MG LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG RB FT LT 500 kV C. PAULISTA /ITAJUBA 3 C-1 SP/MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,369,952.21
  LT 500 kV C. PAULISTA /RESENDE SP/RJ LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ RB FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,938,054.11
  LT 500 kV C. PAULISTA /RESENDE SP/RJ LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ RB FT LT 500 kV C. PAULISTA /RESENDE C-1 SP/RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,617,308.00

 

196 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 500 kV C. PAULISTA /TAUBATE SP LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBNI REA 4347/2013 28/03/2017 27/03/2032 10,099.95
  LT 500 kV C. PAULISTA /TAUBATE SP LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,872,473.06
  LT 500 kV C. PAULISTA /TAUBATE SP LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 6,843,510.07
  LT 500 kV C. PAULISTA /TAUBATE SP LT 500 kV C. PAULISTA /TAUBATE C-1 SP RB FT LT 500 kV C. PAULISTA /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 13,174,374.46
  LT 500 kV C. PAULISTA /TIJUCO PRETO SP LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,264,067.75
  LT 500 kV C. PAULISTA /TIJUCO PRETO SP LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 14,923,799.06
  LT 500 kV C. PAULISTA /TIJUCO PRETO SP LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 28,729,659.97
  LT 500 kV FERNAO DIAS /CAMPINAS SP LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,641,121.79
  LT 500 kV FERNAO DIAS /CAMPINAS SP LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP RB FT LT 500 kV FERNAO DIAS /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 13,439,664.35
  LT 500 kV GURUPI /MIRACEMA TO LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,859,675.94
  LT 500 kV GURUPI /MIRACEMA TO LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 21,107,693.70
  LT 500 kV GURUPI /MIRACEMA TO LT 500 kV GURUPI /MIRACEMA C-1 TO RB FT LT 500 kV GURUPI /MIRACEMA C-1 TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 40,634,215.21
  LT 500 kV IBIUNA /BATEIAS SP/PR LT 500 kV IBIUNA /BATEIAS C-2 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-2 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 71,032,115.58
  LT 500 kV IBIUNA /BATEIAS SP/PR LT 500 kV IBIUNA /BATEIAS C-1 SP/PR RB FT LT 500 kV IBIUNA /BATEIAS C-1 SP/PR 034/2001 IGPM RBL CC 034/2001 21/03/2003 9/5/2031 71,032,115.58
  LT 500 kV IBIUNA /ITATIBA SP LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBNI REA 5861/2016 10/2/2021 9/2/2036 14,552.86
  LT 500 kV IBIUNA /ITATIBA SP LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBNI REA 6605/2017 1/7/2018 17/06/2052 17,174.16
  LT 500 kV IBIUNA /ITATIBA SP LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,976,297.39
  LT 500 kV IBIUNA /ITATIBA SP LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 7,090,865.85
  LT 500 kV IBIUNA /ITATIBA SP LT 500 kV IBIUNA /ITATIBA C-1 SP RB FT LT 500 kV IBIUNA /ITATIBA C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 13,650,556.67
  LT 500 kV ITATIBA /CAMPINAS SP LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBNI REA 6605/2017 1/7/2018 17/06/2052 17,174.16
  LT 500 kV ITATIBA /CAMPINAS SP LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 899,810.84
  LT 500 kV ITATIBA /CAMPINAS SP LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,143,750.14
  LT 500 kV ITATIBA /CAMPINAS SP LT 500 kV ITATIBA /CAMPINAS C-1 SP RB FT LT 500 kV ITATIBA /CAMPINAS C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,126,912.48
  LT 500 kV ITUMBIARA /SAO SIMAO-SE MG LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 5,744,946.12
  LT 500 kV ITUMBIARA /SAO SIMAO-SE MG LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG RB FT LT 500 kV ITUMBIARA /SAO SIMAO-SE C-1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 13,687,020.13
  LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 69,216.22
  LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,824.33
  LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2045 161,990.12
  LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBNI REA 8887/2020 29/08/2017 28/08/2045 161,990.12
  LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 165,753.88
  LT 500 kV MARIMBONDO /MARIMBONDO II MG LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 246,087.29
  LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2045 161,990.12
  LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBNI REA 8887/2020 21/07/2017 20/07/2045 161,990.12
  LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,644,756.95
  LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 6,644,756.95
  LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 15,749,586.84
  LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS MG/SP LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 15,912,372.18
  LT 500 kV NOVA IGUACU /GRAJAU RJ LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ RB FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,351,279.20
  LT 500 kV NOVA IGUACU /GRAJAU RJ LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ RB FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,219,348.85
  LT 500 kV NOVA IGUACU /GRAJAU RJ LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ RB FT LT 500 kV NOVA IGUACU /GRAJAU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,197,537.06
  LT 500 kV NOVA IGUACU /SAO JOSE RJ LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 795,986.51
  LT 500 kV NOVA IGUACU /SAO JOSE RJ LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,896,394.36
  LT 500 kV NOVA IGUACU /SAO JOSE RJ LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,650,730.27
  LT 500 kV POCOS CALDAS /ITAJUBA 3 MG LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,810,527.17
  LT 500 kV POCOS CALDAS /ITAJUBA 3 MG LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 11,460,818.06
  LT 500 kV S.DA MESA /GURUPI GO/TO LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,859,675.94
  LT 500 kV S.DA MESA /GURUPI GO/TO LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 21,107,693.70
  LT 500 kV S.DA MESA /GURUPI GO/TO LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 40,634,215.21
  LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,600,115.12
  LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 8,617,419.17
  LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 20,489,304.23
  LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 20,530,530.20
  LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 39,443,759.68
  LT 500 kV S.DA MESA /SAMAMBAIA GO/DF LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 39,523,123.39
  LT 500 kV TERMINAL RIO /C. PAULISTA RJ/SP LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2057 36,177.83
  LT 500 kV TERMINAL RIO /C. PAULISTA RJ/SP LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 4,879,743.39
  LT 500 kV TERMINAL RIO /RESENDE RJ LT 500 kV TERMINAL RIO /RESENDE C-1 RJ RB FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2057 36,177.83
  LT 500 kV TERMINAL RIO /RESENDE RJ LT 500 kV TERMINAL RIO /RESENDE C-1 RJ RB FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,941,689.28
  LT 500 kV TERMINAL RIO /RESENDE RJ LT 500 kV TERMINAL RIO /RESENDE C-1 RJ RB FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 7,008,413.92
  LT 500 kV TERMINAL RIO /RESENDE RJ LT 500 kV TERMINAL RIO /RESENDE C-1 RJ RB FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 13,491,829.27
  LT 500 kV TIJUCO PRETO /TAUBATE SP LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 539,886.50
  LT 500 kV TIJUCO PRETO /TAUBATE SP LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,286,250.08
  LT 500 kV TIJUCO PRETO /TAUBATE SP LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,476,147.49
  LT 500 kV ZONA OESTE /NOVA IGUACU RJ LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ RB FT LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,002,072.22
  LT 500 kV ZONA OESTE /NOVA IGUACU RJ LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ RB FT LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,387,382.29
  LT 500 kV ZONA OESTE /NOVA IGUACU RJ LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ RB FT LT 500 kV ZONA OESTE /NOVA IGUACU C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,595,926.36
  LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP LT 600 kV F.IGUACU 50HZ /IBIUNA C-2 PR/SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,142,382.22
  LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP LT 600 kV F.IGUACU 50HZ /IBIUNA C-1 PR/SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,142,382.22
  LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP LT 600 kV F.IGUACU 50HZ /IBIUNA C-4 PR/SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,925,193.71
  LT 600 kV F.IGUACU 50HZ /IBIUNA PR/SP LT 600 kV F.IGUACU 50HZ /IBIUNA C-3 PR/SP DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,925,193.71
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 16,535,211.43
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 16,586,563.02
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 16,997,375.73
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 39,394,237.52
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 39,516,579.87
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 40,495,318.69
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-1 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 75,837,462.32
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-2 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 76,072,982.39
  LT 750 kV F.IGUACU 60HZ /IVAIPORA PR LT 750 kV F.IGUACU 60HZ /IVAIPORA C-3 PR DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 77,957,142.94
  LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,556,819.31
  LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,608,170.90
  LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-3 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-3 SP/PR 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 13,967,632.02
  LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 32,298,381.07
  LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 32,420,723.42
  LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-2 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-2 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 62,177,298.29
  LT 750 kV ITABERA /IVAIPORA SP/PR LT 750 kV ITABERA /IVAIPORA C-1 SP/PR RB FT LT 750 kV ITABERA /IVAIPORA C-1 SP/PR 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 62,412,818.36

 

197 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,610,882.85
  LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 15,662,234.43
  LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 16,021,695.55
  LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 37,192,075.17
  LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 37,314,417.52
  LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 71,598,101.06
  LT 750 kV ITABERA /TIJUCO PRETO SP LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 71,833,621.13
  M. MORAES MG 345 kV M. MORAES MG1 MG RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 4,426.70
  M. MORAES MC 138 kV TR 138/13,8 kV M. MORAES TR12 MG DIT   062/2001 IPCA RMEL REN 643/2014 20/05/2014 19/05/2034 14,027.13
  M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-2 SP/MG DIT   062/2001 IPCA RMEL REN 643/2014 24/10/2014 23/10/2035 14,240.58
  M. MORAES MC 13,8 kV TR 138/13,8 kV M. MORAES TR12 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,694.77
  M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 27/04/2014 26/04/2041 38,225.20
  M. MORAES EL 13,8 kV M. MORAES  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,803.25
  M. MORAES EL 13,8 kV M. MORAES  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,803.25
  M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 27/04/2014 26/04/2040 56,606.03
  M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 27/04/2014 26/04/2041 59,401.71
  M. MORAES IB 138 kV MG 345 kV M. MORAES MG1 MG IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,442.16
  M. MORAES EL 345 kV M. MORAES LT 345 kV ESTREITO /M. MORAES C-1 MG RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBNI REA 2040/2009 6/4/2015 5/4/2042 74,725.00
  M. MORAES MC 13,8 kV TR 138/13,8 kV M. MORAES TR12 MG DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 82,658.40
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB3 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBNI REA 2040/2009 6/4/2015 5/4/2042 85,827.65
  M. MORAES MC 138 kV TR 345/138 kV M. MORAES TR11 MG MC1 RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  M. MORAES MC 138 kV TR 138/13,8 kV M. MORAES TR12 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  M. MORAES EL 13,8 kV M. MORAES  DIST1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,446.63
  M. MORAES MC 138 kV TR 138/13,8 kV M. MORAES TR12 MG DIT   062/2001 IPCA RCDM REA 1814/2009 26/11/2018 25/11/2050 105,970.22
  M. MORAES TR 138/13,8 kV M. MORAES TRR3 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,114.43
  M. MORAES TR 138/13,8 kV M. MORAES TR12 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 112,114.43
  M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-2 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  M. MORAES EL 138 kV M. MORAES LT 138 kV JAGUARA-US /M. MORAES C-1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-2 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  M. MORAES EL 138 kV M. MORAES LT 138 kV CASSIA /M. MORAES C-2 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 27/04/2014 26/04/2043 130,805.34
  M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 5/5/2013 4/5/2039 149,649.45
  M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-2 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 22/07/2013 21/07/2039 150,689.90
  M. MORAES MC 13,8 kV TR 138/13,8 kV M. MORAES TR12 MG DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 159,124.87
  M. MORAES EL 13,8 kV M. MORAES  DIST1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 177,968.10
  M. MORAES MG 345 kV M. MORAES MG1 MG RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBNI REA 1365/2008 30/11/2018 30/11/2058 180,725.99
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB5 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB4 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB3 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB2 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  M. MORAES MC 345 kV TR 345/138 kV M. MORAES TR11 MG MC1 RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  M. MORAES IB 138 kV MG 345 kV M. MORAES MG1 MG IB1 DIT   062/2001 IPCA RCDM REA 1814/2009 5/5/2013 4/5/2040 224,656.29
  M. MORAES EL 345 kV M. MORAES LT 345 kV FURNAS /M. MORAES C-1 MG RB FT LT 345 kV FURNAS /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  M. MORAES EL 345 kV M. MORAES LT 345 kV ESTREITO /M. MORAES C-1 MG RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  M. MORAES TR 138/138 kV M. MORAES TREG11 MG RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 254,786.68
  M. MORAES EL 138 kV M. MORAES LT 138 kV JAGUARA-US /M. MORAES C-1 MG DIT   062/2001 IPCA RCDM REA 1814/2009 8/10/2013 7/10/2040 280,443.87
  M. MORAES EL 138 kV M. MORAES LT 138 kV CASSIA /M. MORAES C-2 MG DIT   062/2001 IPCA RCDM REA 1814/2009 17/12/2013 16/12/2040 282,053.91
  M. MORAES EL 345 kV M. MORAES LT 345 kV ESTREITO /M. MORAES C-1 MG RB FT LT 345 kV ESTREITO /M. MORAES C-1 MG 062/2001 IPCA RBNI REA 1523/2008 6/4/2015 5/4/2044 282,185.23
  M. MORAES EL 138 kV M. MORAES LT 138 kV MORRO DO CIPO /M. MORAES C-2 SP/MG DIT   062/2001 IPCA RCDM REA 1814/2009 24/02/2014 23/02/2042 283,620.34
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB3 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBNI REA 1523/2008 29/09/2016 28/09/2047 284,026.31
  M. MORAES MG 345 kV M. MORAES MG1 MG RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBNI REA 1938/2009 15/08/2014 14/08/2041 301,013.50
  M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 310,104.14
  M. MORAES MC 138 kV TR 345/138 kV M. MORAES TR11 MG MC2 RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBNI REA 1938/2009 14/12/2018 14/12/2048 381,285.07
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB2 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 469,392.83
  M. MORAES EL 138 kV M. MORAES LT 138 kV FRANCA /M. MORAES C-1 SP/MG DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 596,978.46
  M. MORAES MG 345 kV M. MORAES MG1 MG RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 635,018.22
  M. MORAES EL 138 kV M. MORAES  FRANCA 3 DIT   062/2001 IPCA RCDM REA 1814/2009 30/09/2012 29/09/2038 734,976.39
  M. MORAES MC 138 kV TR 345/138 kV M. MORAES TR12 MG RBF FT TR 345/138 kV M. MORAES TR12 MG 062/2001 IPCA RBNI REA 1365/2008 23/07/2013 22/07/2040 811,498.76
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB1 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBNI REA 1938/2009 14/12/2018 14/12/2050 866,100.06
  M. MORAES IB 345 kV MG 345 kV M. MORAES MG1 MG IB2 RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 903,623.56
  M. MORAES MC 345 kV TR 345/138 kV M. MORAES TR11 MG MC2 RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBNI REA 1938/2009 14/12/2018 14/12/2051 922,611.74
  M. MORAES MC 345 kV TR 345/138 kV M. MORAES TR12 MG RBF FT TR 345/138 kV M. MORAES TR12 MG 062/2001 IPCA RBNI REA 1365/2008 23/07/2013 22/07/2040 1,301,219.83
  M. MORAES MG 345 kV M. MORAES MG1 MG RB FT MG 345 kV M. MORAES MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,512,896.21
  M. MORAES TR 345/138 kV M. MORAES TRR2 MG RBF FT TR 345/138 kV M. MORAES TRR2 MG 062/2001 IPCA RBNI REA 1365/2008 27/03/2015 26/03/2047 1,687,764.70
  M. MORAES TR 345/138 kV M. MORAES TR12 MG RBF FT TR 345/138 kV M. MORAES TR12 MG 062/2001 IPCA RBNI REA 1365/2008 23/07/2013 22/07/2043 5,067,553.17
  M. MORAES TR 345/138 kV M. MORAES TR11 MG RBF FT TR 345/138 kV M. MORAES TR11 MG 062/2001 IPCA RBNI REA 1938/2009 14/12/2018 14/12/2058 6,017,585.38
  MACAE MERCHAN MG 345 kV MACAE MERCHAN MG1 RJ RB FT MG 345 kV MACAE MERCHAN MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 6,114.70
  MACAE MERCHAN RTB 345 kV 20 Mvar MACAE MERCHAN RTR1 RJ RB FT RTB 345 kV 20 Mvar MACAE MERCHAN RTR1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 128,369.76
  MACAE MERCHAN MC 345 kV RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ RB FT RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 187,216.19
  MACAE MERCHAN IB 345 kV MG 345 kV MACAE MERCHAN MG1 RJ IB2 RB FT MG 345 kV MACAE MERCHAN MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  MACAE MERCHAN IB 345 kV MG 345 kV MACAE MERCHAN MG1 RJ IB1 RB FT MG 345 kV MACAE MERCHAN MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  MACAE MERCHAN EL 345 kV MACAE MERCHAN LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  MACAE MERCHAN EL 345 kV MACAE MERCHAN LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-2 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  MACAE MERCHAN EL 345 kV MACAE MERCHAN LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  MACAE MERCHAN EL 345 kV MACAE MERCHAN LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /MACAE MERCHAN C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  MACAE MERCHAN RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ RB FT RTB 345 kV 60 Mvar MACAE MERCHAN RT1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,109.29
  MACAE MERCHAN MG 345 kV MACAE MERCHAN MG1 RJ RB FT MG 345 kV MACAE MERCHAN MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 646,351.55
  MACAE MERCHAN IB 345 kV MG 345 kV MACAE MERCHAN MG2 RJ IB3 RB FT MG 345 kV MACAE MERCHAN MG2 RJ 006/2005 IGPM RBL CC 006/2005 2/6/2010 4/3/2035 1,170,863.55
  MACAE MERCHAN EL 345 kV MACAE MERCHAN LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ RB FT LT 345 kV CAMPOS /MACAE MERCHAN C-3 RJ 006/2005 IGPM RBL CC 006/2005 2/6/2010 4/3/2035 3,034,584.73
  MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 2,076.68
  MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBNI REA 7761/2019 13/12/2017 12/12/2032 10,181.00
  MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBNI REA 7761/2019 13/12/2017 12/12/2032 10,181.00
  MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP RB FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP 062/2001 IPCA RBNI REA 7761/2019 13/12/2017 12/12/2032 10,181.00
  MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBNI REA 4347/2013 6/7/2015 5/7/2040 19,964.28

 

198 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBNI REA 5861/2016 21/12/2017 20/12/2034 22,030.24
  MARIMBONDO MC 13,8 kV RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  MARIMBONDO MC 13,8 kV RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RMEL REN 443/2011 13/07/2017 12/7/2031 54,833.22
  MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBNI REA 6787/2017 13/11/2020 13/11/2051 121,790.35
  MARIMBONDO MC 345 kV TR 500/345 kV MARIMBONDO TR9 MG RB FT TR 500/345 kV MARIMBONDO TR9 MG 062/2001 IPCA RBNI REA 5861/2016 26/01/2020 25/01/2035 130,101.57
  MARIMBONDO MC 500 kV TR 500/345 kV MARIMBONDO TR9 MG RB FT TR 500/345 kV MARIMBONDO TR9 MG 062/2001 IPCA RBNI REA 5861/2016 26/01/2020 25/01/2035 138,333.89
  MARIMBONDO RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,505.07
  MARIMBONDO RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,505.07
  MARIMBONDO MC 345 kV TR 500/345 kV MARIMBONDO TR9 MG RB FT TR 500/345 kV MARIMBONDO TR9 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  MARIMBONDO MC 500 kV RTB 500 kV 100 MVAr MARIMBONDO RT4 MG RB FT RTB 500 kV 100 MVAr MARIMBONDO RT4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 301,456.04
  MARIMBONDO MC 500 kV TR 500/345 kV MARIMBONDO TR9 MG RB FT TR 500/345 kV MARIMBONDO TR9 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG8 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG7 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG6 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG5 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG4 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG3 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG2 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  MARIMBONDO IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB3 RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  MARIMBONDO IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB2 RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  MARIMBONDO IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB1 RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  MARIMBONDO RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT2 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,275.42
  MARIMBONDO RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG RB FT RTB 13,8 kV 50 Mvar MARIMBONDO RT1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 344,275.42
  MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  MARIMBONDO EL 500 kV MARIMBONDO LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP RB FT LT 500 kV MARIMBONDO /AGUA VERMELHA C-1 MG/SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  MARIMBONDO TR 500/345 kV MARIMBONDO TRR1 MG RB FT TR 500/345 kV MARIMBONDO TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 496,318.00
  MARIMBONDO RTB 500 kV 100 MVAr MARIMBONDO RT4 MG RB FT RTB 500 kV 100 MVAr MARIMBONDO RT4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 523,813.92
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG8 MG DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  MARIMBONDO MC 500 kV TR 13,8/500 kV MARIMBONDO TRG8 MG DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,476,675.82
  MARIMBONDO TR 500/345 kV MARIMBONDO TR9 MG RB FT TR 500/345 kV MARIMBONDO TR9 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,488,086.24
  MARIMBONDO IB 500 kV MG 500 kV MARIMBONDO MG1 MG IB4 RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBNI REA 6787/2017 13/11/2020 13/11/2051 1,489,692.41
  MARIMBONDO MG 500 kV MARIMBONDO MG1 MG RB FT MG 500 kV MARIMBONDO MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,604,213.74
  MARIMBONDO II EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-2 MG/SP 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2046 176,554.37
  MARIMBONDO II EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP RB FT LT 500 kV MARIMBONDO II /ARARAQUARA FURNAS C-1 MG/SP 062/2001 IPCA RBNI REA 8887/2020 29/08/2017 28/08/2046 176,554.37
  MARIMBONDO II EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-2 MG 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2046 176,554.37
  MARIMBONDO II EL 500 kV MARIMBONDO II LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG RB FT LT 500 kV MARIMBONDO /MARIMBONDO II C-1 MG 062/2001 IPCA RBNI REA 8887/2020 21/07/2017 20/07/2046 176,554.37
  MARIMBONDO II IB 500 kV MG 500 kV MARIMBONDO II MG4 MG IB6 RB FT MG 500 kV MARIMBONDO II MG4 MG 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2049 189,931.69
  MARIMBONDO II IB 500 kV MG 500 kV MARIMBONDO II MG4 MG IB5 RB FT MG 500 kV MARIMBONDO II MG2 MG 062/2001 IPCA RBNI REA 8887/2020 28/08/2017 27/08/2049 189,931.69
  MOGI TR 345/230 kV MOGI TRR1 SP RB FT TR 345/230 kV MOGI TRR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 337,712.26
  MOGI TR 345/230 kV MOGI TRR1 SP RB FT TR 345/230 kV MOGI TRR1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 804,581.00
  MOGI TR 345/230 kV MOGI TRR1 SP RB FT TR 345/230 kV MOGI TRR1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,548,891.03
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 8/2/2015 7/2/2036 10,584.32
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 8/2/2015 7/2/2036 10,584.32
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 8/2/2015 7/2/2036 10,584.32
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 1/3/2015 29/02/2036 10,607.95
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 1/3/2015 29/02/2036 10,607.95
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RMEL REN 443/2011 1/3/2015 29/02/2036 10,607.95
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/03/2015 21/03/2036 10,626.03
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/03/2015 21/03/2036 10,626.03
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/03/2015 21/03/2036 10,626.03
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP RB FT LT 230 kV MOGI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046 28,706.84
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 3578/2012 6/4/2015 5/4/2052 32,683.58
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP RB FT LT 230 kV MOGI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 3578/2012 6/4/2015 5/4/2052 32,683.58
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 3578/2012 6/4/2015 5/4/2052 32,683.58
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 2040/2009 6/4/2015 5/4/2042 37,363.47
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046 57,413.69
  MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046 61,841.17
  MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046 61,841.17
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 1814/2009 6/4/2015 5/4/2042 73,309.51
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 2040/2009 6/4/2015 5/4/2042 88,925.04
  MOGI CRUZES IB 230 kV MG 345 kV MOGI CRUZES MG1 SP IB1 RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 89,977.32
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP RB FT LT 230 kV MOGI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 2837/2011 6/4/2015 5/4/2042 112,741.53
  MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 113,688.31
  MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 113,688.31
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046 115,827.69
  MOGI CRUZES MG 345 kV MOGI CRUZES MG1 SP RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2044 123,068.21
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 2837/2011 3/5/2017 2/5/2049 131,991.85
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 2837/2011 3/5/2017 2/5/2048 142,704.80
  MOGI CRUZES IB 230 kV MG 345 kV MOGI CRUZES MG1 SP IB1 RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBNI REA 4347/2013 20/04/2017 19/04/2046 154,912.43
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP RB FT LT 230 kV S.JOSE CAMPOS /MOGI CRUZES C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,225.48
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV MOGI /MOGI CRUZES C-1 SP RB FT LT 230 kV MOGI /MOGI CRUZES C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,225.48
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 165,225.48
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 1814/2009 6/4/2015 5/4/2042 171,086.35
  MOGI CRUZES EL 230 kV MOGI CRUZES LT 230 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 230 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 2837/2011 6/4/2015 5/4/2044 184,733.67
  MOGI CRUZES IB 345 kV MG 345 kV MOGI CRUZES MG1 SP IB1 RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP 062/2001 IPCA RBNI REA 1814/2009 6/4/2015 5/4/2045 200,610.32
  MOGI CRUZES IB 230 kV MG 345 kV MOGI CRUZES MG1 SP IB1 RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 214,366.04
  MOGI CRUZES MC 345 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  MOGI CRUZES MC 345 kV TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-2 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16

 

199 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 270,856.19
  MOGI CRUZES MC 230 kV TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 270,856.19
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ITAPETI /MOGI CRUZES C-1 SP RB FT LT 345 kV ITAPETI /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 1814/2009 16/02/2013 15/02/2039 330,694.59
  MOGI CRUZES IB 345 kV MG 345 kV MOGI CRUZES MG1 SP IB1 RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBNI REA 1814/2009 22/10/2012 21/10/2038 369,113.36
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV MOGI CRUZES /NORDESTE C-1 SP RB FT LT 345 kV MOGI CRUZES /NORDESTE C-1 SP 062/2001 IPCA RBNI REA 1814/2009 6/4/2015 5/4/2044 371,600.42
  MOGI CRUZES EL 345 kV MOGI CRUZES LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP RB FT LT 345 kV ATIBAIA 2 /MOGI CRUZES C-1 SP 062/2001 IPCA RBNI REA 1814/2009 11/8/2012 10/8/2038 378,561.45
  MOGI CRUZES MC 345 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  MOGI CRUZES MC 345 kV TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  MOGI CRUZES MG 345 kV MOGI CRUZES MG1 SP RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 778,180.00
  MOGI CRUZES TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,012,462.85
  MOGI CRUZES TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,012,462.85
  MOGI CRUZES MC 345 kV TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  MOGI CRUZES MG 345 kV MOGI CRUZES MG1 SP RB FT MG 345 kV MOGI CRUZES MG1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,853,971.32
  MOGI CRUZES TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,412,137.39
  MOGI CRUZES TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,412,137.39
  MOGI CRUZES TR 345/230 kV MOGI CRUZES TR2 SP RB FT TR 345/230 kV MOGI CRUZES TR2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,643,582.17
  MOGI CRUZES TR 345/230 kV MOGI CRUZES TR1 SP RB FT TR 345/230 kV MOGI CRUZES TR1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,643,582.17
  NIQUELANDIA MG 230 kV NIQUELANDIA MG1 GO RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RMEL REN 443/2011 8/12/2017 7/12/2032 8,397.14
  NIQUELANDIA MG 230 kV NIQUELANDIA MG1 GO RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RMEL REN 443/2011 30/11/2017 29/11/2032 18,905.13
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBNI REA 3578/2012 22/04/2019 21/04/2049 25,207.96
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBNI REA 3578/2012 6/5/2016 5/5/2044 38,551.20
  NIQUELANDIA IB 230 kV MG 230 kV NIQUELANDIA MG1 GO IB1 RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,374.64
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,614.70
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV NIQUELANDIA /CODEMIN C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 169,614.70
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 169,614.70
  NIQUELANDIA EL 230 kV NIQUELANDIA  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 169,614.70
  NIQUELANDIA IB 230 kV MG 230 kV NIQUELANDIA MG1 GO IB1 RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 246,284.42
  NIQUELANDIA MG 230 kV NIQUELANDIA MG1 GO RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 324,083.37
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 404,097.74
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV NIQUELANDIA /CODEMIN C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 404,097.74
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 404,097.74
  NIQUELANDIA EL 230 kV NIQUELANDIA  DIST1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 404,097.74
  NIQUELANDIA IB 230 kV MG 230 kV NIQUELANDIA MG1 GO IB1 RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 474,119.73
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-2 GO 028/2009 IPCA RBL CC 028/2009 1/7/2016 19/11/2039 647,028.16
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO 028/2009 IPCA RBL CC 028/2009 27/09/2017 19/11/2039 676,326.91
  NIQUELANDIA MG 230 kV NIQUELANDIA MG1 GO RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 772,110.91
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 777,924.62
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV NIQUELANDIA /CODEMIN C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 777,924.62
  NIQUELANDIA EL 230 kV NIQUELANDIA LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO RB FT LT 230 kV BARRO ALTO /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 777,924.62
  NIQUELANDIA EL 230 kV NIQUELANDIA  DIST1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 777,924.62
  NIQUELANDIA MG 230 kV NIQUELANDIA MG1 GO RB FT MG 230 kV NIQUELANDIA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,486,383.18
  NORDESTE EL 345 kV NORDESTE LT 345 kV ITAPETI /NORDESTE C-1 SP RB FT LT 345 kV ITAPETI /NORDESTE C-1 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 2,192,800.91
  OURO PRETO 2 EL 345 kV OURO PRETO 2 LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG RB FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG 062/2001 IPCA RBNI REA 8314/2019 10/3/2021 9/3/2036 71,038.45
  OURO PRETO 2 MG 345 kV OURO PRETO 2 MG2 MG RB FT MG 345 kV OURO PRETO 2 MG2 MG 062/2001 IPCA RBNI REA 8314/2019 28/04/2021 27/04/2036 104,342.37
  OURO PRETO 2 MC 345 kV RTL 345 kV 60 MVAr OURO PRETO 2 RTS5 MG RB FT RTL 345 kV 60 MVAr OURO PRETO 2 RTS5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,880.21
  OURO PRETO 2 IB 345 kV MG 345 kV OURO PRETO 2 MG2 MG IB1 RB FT MG 345 kV OURO PRETO 2 MG2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  OURO PRETO 2 MC 345 kV BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG RB FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 201,716.16
  OURO PRETO 2 MC 345 kV TR 500/345 kV OURO PRETO 2 TR5 MG RB FT TR 500/345 kV OURO PRETO 2 TR5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  OURO PRETO 2 MC 345 kV BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG RB FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG 062/2001 IPCA RMEL REN 643/2014 25/11/2016 24/11/2048 212,944.28
  OURO PRETO 2 IB 500 kV MG 345 kV OURO PRETO 2 MG2 MG IB3 RB FT MG 345 kV OURO PRETO 2 MG2 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039 220,261.43
  OURO PRETO 2 EL 345 kV OURO PRETO 2 LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG RB FT LT 345 kV BARRO BRANCO /OURO PRETO 2 C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  OURO PRETO 2 BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG RB FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,100.27
  OURO PRETO 2 MC 500 kV TR 500/345 kV OURO PRETO 2 TR5 MG RB FT TR 500/345 kV OURO PRETO 2 TR5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  OURO PRETO 2 RTL 345 kV 60 MVAr OURO PRETO 2 RTS5 MG RB FT RTL 345 kV 60 MVAr OURO PRETO 2 RTS5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,109.29
  OURO PRETO 2 TR 500/345 kV OURO PRETO 2 TRR1 MG RB FT TR 500/345 kV OURO PRETO 2 TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 441,072.39
  OURO PRETO 2 BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG RB FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 591,085.32
  OURO PRETO 2 EL 500 kV OURO PRETO 2 LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG RB FT LT 500 kV B.DESPACHO 3 /OURO PRETO 2 C-1 MG 003/2009 IPCA RBL CC 003/2009 28/01/2009 28/01/2039 605,906.27
  OURO PRETO 2 MG 345 kV OURO PRETO 2 MG2 MG RB FT MG 345 kV OURO PRETO 2 MG2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 784,446.06
  OURO PRETO 2 BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG RB FT BC 345 kV 200 Mvar OURO PRETO 2 BC1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,137,892.59
  OURO PRETO 2 TR 500/345 kV OURO PRETO 2 TR5 MG RB FT TR 500/345 kV OURO PRETO 2 TR5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,324,434.64
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 28/06/2017 27/06/2040 4,755.07
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 28/06/2017 27/06/2040 4,755.07
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 28/06/2017 27/06/2040 4,755.07
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-2 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 29/06/2017 28/06/2040 4,755.50
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-2 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 29/06/2017 28/06/2040 4,755.50
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-2 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 29/06/2017 28/06/2040 4,755.50
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-3 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 30/06/2017 29/06/2040 4,755.93
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-3 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 30/06/2017 29/06/2040 4,755.93
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-3 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 30/06/2017 29/06/2040 4,755.93
  P. COLOMBIA MC 138 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RMEL REN 443/2011 31/08/2017 30/08/2040 4,775.87
  P. COLOMBIA MC 138 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RMEL REN 443/2011 31/08/2017 30/08/2040 4,775.87
  P. COLOMBIA MC 138 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RMEL REN 443/2011 31/08/2017 30/08/2040 4,775.87
  P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RMEL REN 443/2011 13/07/2017 12/7/2031 9,381.04
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG RB FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 3/7/2017 2/7/2040 11,328.98
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG RB FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 3/7/2017 2/7/2040 11,328.98
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG RB FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 3/7/2017 2/7/2040 11,328.98
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 4/7/2017 3/7/2040 11,329.99
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 4/7/2017 3/7/2040 11,329.99
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RMEL REN 443/2011 4/7/2017 3/7/2040 11,329.99
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RMEL REN 443/2011 5/7/2017 4/7/2040 11,331.00
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RMEL REN 443/2011 5/7/2017 4/7/2040 11,331.00
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RMEL REN 443/2011 5/7/2017 4/7/2040 11,331.00
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 10/8/2017 9/8/2046 16,339.52
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 10/8/2017 9/8/2046 16,339.52
  P. COLOMBIA TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 22,003.61
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 10/8/2017 9/8/2046 22,548.53

 

200 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 10/8/2017 9/8/2046 22,548.53
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 10/8/2017 9/8/2046 22,548.53
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 10/8/2017 9/8/2046 22,548.53
  P. COLOMBIA MC 13,8 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,694.77
  P. COLOMBIA MC 138 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RCDM REA 6198/2017 30/12/2019 30/12/2052 38,773.76
  P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG3 MG DIT   062/2001 IPCA RCDM REA 6198/2017 30/12/2019 30/12/2052 38,773.76
  P. COLOMBIA EL 13,8 kV P. COLOMBIA  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,803.25
  P. COLOMBIA EL 13,8 kV P. COLOMBIA  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,803.25
  P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2051 42,778.46
  P. COLOMBIA IB 138 kV MG 345 kV P. COLOMBIA MG1 MG IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  P. COLOMBIA MC 13,8 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 82,658.40
  P. COLOMBIA EL 13,8 kV P. COLOMBIA  DIST2 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,446.63
  P. COLOMBIA EL 13,8 kV P. COLOMBIA  DIST1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 92,446.63
  P. COLOMBIA IB 138 kV MG 345 kV P. COLOMBIA MG1 MG IB1 DIT   062/2001 IPCA RCDM REA 6198/2017 31/01/2020 31/01/2050 92,834.71
  P. COLOMBIA MC 138 kV TR 138/13,8 kV P. COLOMBIA TRSA MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG4 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG3 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG2 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG1 MG DIT   062/2001 IPCA RMEL REN 443/2011 8/2/2013 7/2/2041 129,361.07
  P. COLOMBIA MC 138 kV TR 13,8/138 kV P. COLOMBIA TRG2 MG DIT   062/2001 IPCA RMEL REN 443/2011 15/03/2013 14/03/2041 129,742.58
  P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2055 137,332.53
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-3 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-2 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV BARRETOS 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  P. COLOMBIA EL 138 kV P. COLOMBIA  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  P. COLOMBIA IB 345 kV MG 345 kV P. COLOMBIA MG1 MG IB1 RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2052 224,213.18
  P. COLOMBIA IB 345 kV MG 345 kV P. COLOMBIA MG1 MG IB2 RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG RB FT LT 345 kV MARIMBONDO /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  P. COLOMBIA EL 138 kV P. COLOMBIA LT 138 kV CATU 1 /P. COLOMBIA C-1 SP/MG DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  P. COLOMBIA IB 345 kV MG 345 kV P. COLOMBIA MG1 MG IB1 RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBNI REA 1814/2009 29/05/2012 28/05/2037 378,791.91
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG RB FT LT 345 kV P. COLOMBIA /VOLTA GRANDE C-1 MG 062/2001 IPCA RBNI REA 1814/2009 18/07/2012 17/07/2037 409,234.93
  P. COLOMBIA EL 345 kV P. COLOMBIA LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG RB FT LT 345 kV ITUMBIARA /P. COLOMBIA C-1 MG 062/2001 IPCA RBNI REA 1814/2009 5/10/2012 4/10/2037 419,629.48
  P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 608,856.02
  P. COLOMBIA MC 138 kV TR 345/138 kV P. COLOMBIA TR6 MG RBF FT TR 345/138 kV P. COLOMBIA TR6 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2044 776,304.99
  P. COLOMBIA MC 345 kV TR 345/138 kV P. COLOMBIA TR6 MG RBF FT TR 345/138 kV P. COLOMBIA TR6 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2047 1,312,704.12
  P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,450,566.18
  P. COLOMBIA TR 345/138 kV P. COLOMBIA TR6R MG RBF FT TR 345/138 kV P. COLOMBIA TR6 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2055 1,467,414.60
  P. COLOMBIA MG 345 kV P. COLOMBIA MG1 MG RB FT MG 345 kV P. COLOMBIA MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,792,470.80
  P. COLOMBIA TR 138/138 kV P. COLOMBIA TRD6 MG RBF FT TR 345/138 kV P. COLOMBIA TR6 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2055 3,962,256.26
  P. COLOMBIA TR 345/138 kV P. COLOMBIA TR6 MG RBF FT TR 345/138 kV P. COLOMBIA TR6 MG 062/2001 IPCA RBNI REA 6198/2017 31/01/2020 31/01/2055 4,402,243.80
  PARQUE EMAS MG 138 kV PARQUE EMAS MG1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2038 638,046.01
  PARQUE EMAS EL 138 kV PARQUE EMAS LT 138 kV PARQUE EMAS /C. MAGALHAES C-1 GO/MT DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2039 823,340.35
  PARQUE EMAS EL 138 kV PARQUE EMAS LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2039 874,568.68
  PIRINEUS IB 230 kV MG 230 kV PIRINEUS MG1 GO IB1 RB FT MG 230 kV PIRINEUS MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,374.64
  PIRINEUS EL 230 kV PIRINEUS LT 230 kV PIRINEUS /XAVANTES C-1 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  PIRINEUS EL 230 kV PIRINEUS LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO RB FT LT 230 kV BRAS. SUL /PIRINEUS C-1 DF/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  PIRINEUS MG 230 kV PIRINEUS MG1 GO RB FT MG 230 kV PIRINEUS MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 295,437.67
  PIRINEUS EL 230 kV PIRINEUS LT 230 kV PIRINEUS /XAVANTES C-2 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-2 GO 014/2011 IPCA RBL CC 014/2011 8/6/2018 9/12/2041 671,241.80
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 390.76
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2041 578.92
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2041 578.92
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2041 578.92
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040 4,719.45
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040 4,719.45
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040 4,719.45
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 10/4/2017 9/4/2040 4,727.54
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 10/4/2017 9/4/2040 4,727.54
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 10/4/2017 9/4/2040 4,727.54
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-2 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 12/4/2017 11/4/2040 4,728.40
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-2 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 12/4/2017 11/4/2040 4,728.40
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-2 SP/MG DIT   062/2001 IPCA RMEL REN 443/2011 12/4/2017 11/4/2040 4,728.40
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-1 MG DIT   062/2001 IPCA RMEL REN 443/2011 14/05/2017 13/05/2040 4,739.01
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-1 MG DIT   062/2001 IPCA RMEL REN 443/2011 14/05/2017 13/05/2040 4,739.01
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-1 MG DIT   062/2001 IPCA RMEL REN 443/2011 14/05/2017 13/05/2040 4,739.01
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-2 MG DIT   062/2001 IPCA RMEL REN 443/2011 15/05/2017 14/05/2040 4,739.44
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-2 MG DIT   062/2001 IPCA RMEL REN 443/2011 15/05/2017 14/05/2040 4,739.44
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-2 MG DIT   062/2001 IPCA RMEL REN 443/2011 15/05/2017 14/05/2040 4,739.44
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040 4,744.13
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040 4,744.13
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040 4,744.13
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBNI REA 4347/2013 2/7/2015 1/7/2040 4,991.28
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBNI REA 4347/2013 2/7/2015 1/7/2040 4,991.28
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBNI REA 4347/2013 2/7/2015 1/7/2040 4,991.28
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4347/2013 2/7/2015 1/7/2040 4,991.28
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBNI REA 4347/2013 2/7/2015 1/7/2040 4,991.28
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4347/2013 2/7/2015 1/7/2040 4,991.28
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RBNI REA 4347/2013 2/7/2015 1/7/2040 4,991.28
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RBNI REA 4347/2013 2/7/2015 1/7/2040 4,991.28
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4347/2013 2/7/2015 1/7/2040 4,991.28
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 4347/2013 2/7/2015 1/7/2040 4,991.28
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 643/2014 21/10/2016 20/10/2045 6,637.85

 

201 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  POCOS CALDAS MC 13,8 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 643/2014 23/12/2016 22/12/2045 6,670.07
  POCOS CALDAS MC 13,8 kV RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG 062/2001 IPCA RMEL REN 443/2011 31/05/2017 30/05/2031 8,599.29
  POCOS CALDAS MC 13,8 kV RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2031 8,813.53
  POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 443/2011 23/12/2016 22/12/2040 9,909.37
  POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 443/2011 23/12/2016 22/12/2040 9,909.37
  POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 443/2011 23/12/2016 22/12/2040 9,909.37
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBNI REA 4347/2013 2/7/2015 1/7/2040 9,982.55
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBNI REA 4347/2013 2/7/2015 1/7/2040 9,982.55
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 10/12/2016 9/12/2040 10,532.13
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 10/12/2016 9/12/2040 10,532.13
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 10/12/2016 9/12/2040 10,532.13
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RMEL REN 443/2011 8/1/2017 7/1/2040 11,193.02
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RMEL REN 443/2011 8/1/2017 7/1/2040 11,193.02
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RMEL REN 443/2011 8/1/2017 7/1/2040 11,193.02
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 29/01/2017 28/01/2040 11,214.72
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 29/01/2017 28/01/2040 11,214.72
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 29/01/2017 28/01/2040 11,214.72
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 17/02/2017 16/02/2040 11,227.05
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 17/02/2017 16/02/2040 11,227.05
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 17/02/2017 16/02/2040 11,227.05
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 3/3/2017 2/3/2040 11,234.19
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 3/3/2017 2/3/2040 11,234.19
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 3/3/2017 2/3/2040 11,234.19
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040 11,246.51
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040 11,246.51
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RMEL REN 443/2011 15/03/2017 14/03/2040 11,246.51
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RMEL REN 443/2011 23/03/2017 22/03/2040 11,254.72
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RMEL REN 443/2011 23/03/2017 22/03/2040 11,254.72
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RMEL REN 443/2011 23/03/2017 22/03/2040 11,254.72
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/5/2017 10/5/2040 11,290.08
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/5/2017 10/5/2040 11,290.08
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/5/2017 10/5/2040 11,290.08
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040 11,305.34
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040 11,305.34
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RMEL REN 443/2011 26/05/2017 25/05/2040 11,305.34
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040 11,307.38
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040 11,307.38
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040 11,307.38
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 31/05/2017 30/05/2040 11,310.44
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 31/05/2017 30/05/2040 11,310.44
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 31/05/2017 30/05/2040 11,310.44
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBNI REA 7761/2019 31/05/2019 30/05/2034 13,355.88
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBNI REA 7761/2019 4/4/2021 3/4/2036 13,355.88
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBNI REA 7761/2019 4/4/2021 3/4/2036 13,355.88
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBNI REA 7761/2019 7/4/2021 6/4/2036 13,355.88
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBNI REA 7761/2019 4/4/2021 3/4/2036 13,355.88
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 5/7/2016 4/7/2029 13,522.01
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 2/5/2017 1/5/2040 15,995.03
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 2/5/2017 1/5/2040 15,995.03
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 2/5/2017 1/5/2040 15,995.03
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040 16,032.58
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040 16,032.58
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 28/05/2017 27/05/2040 16,032.58
  POCOS CALDAS MC 13,8 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 17,542.77
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 5/7/2016 4/7/2029 19,501.89
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 5/7/2016 4/7/2029 19,501.89
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 10/4/2017 9/4/2046 23,816.39
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 10/4/2017 9/4/2046 23,816.39
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RMEL REN 443/2011 10/4/2017 9/4/2046 23,816.39
  POCOS CALDAS IB 345 kV MG 500 kV POCOS CALDAS MG1 MG IB1 RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBNI REA 4347/2013 2/7/2015 1/7/2040 29,947.65
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 443/2011 5/7/2016 4/7/2029 30,619.60
  POCOS CALDAS MC 345 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 643/2014 23/12/2016 22/12/2039 33,550.85
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR6 MG RBF FT TR 345/138 kV POCOS CALDAS TR6 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 34,694.77
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 34,694.77
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 34,694.77
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 2/5/2017 1/5/2047 42,397.19
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 643/2014 10/12/2016 9/12/2045 45,880.01
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/2/2017 10/2/2046 46,061.91
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 443/2011 11/2/2017 10/2/2046 46,061.91
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 25/02/2017 24/02/2046 46,110.75
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 2/5/2017 1/5/2046 46,280.72
  POCOS CALDAS IB 138 kV MG 500 kV POCOS CALDAS MG1 MG IB1 DIT   062/2001 IPCA RMEL REN 643/2014 15/10/2016 14/10/2045 46,591.51
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RMEL REN 643/2014 17/10/2016 16/10/2039 47,334.91
  POCOS CALDAS MC 13,8 kV RTB 13,8 kV 50 Mvar POCOS CALDAS RT5 MG RB FT RTB 13,8 kV 50 Mvar POCOS CALDAS RT5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  POCOS CALDAS MC 13,8 kV RTB 13,8 kV 50 Mvar POCOS CALDAS RT4 MG RB FT RTB 13,8 kV 50 Mvar POCOS CALDAS RT4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  POCOS CALDAS MC 13,8 kV RTB 13,8 kV 25 Mvar POCOS CALDAS RT2 MG RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  POCOS CALDAS MC 13,8 kV RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  POCOS CALDAS MC 13,8 kV TR 345/138 kV POCOS CALDAS TR5 MG RBF FT TR 345/138 kV POCOS CALDAS TR5 MG 062/2001 IPCA RBNI REA 1497/2008 22/12/2012 21/12/2043 49,370.63
  POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 643/2014 23/12/2016 22/12/2045 49,776.96
  POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2046 49,862.40
  POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RMEL REN 443/2011 20/01/2017 19/01/2046 49,862.40
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RMEL REN 443/2011 2/5/2017 1/5/2046 67,073.50
  POCOS CALDAS IB 138 kV MG 500 kV POCOS CALDAS MG1 MG IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,442.16
  POCOS CALDAS TT 13,8/0 kV POCOS CALDAS TRT5 MG RBF FT TR 345/138 kV POCOS CALDAS TR5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  POCOS CALDAS TT 13,8/0 kV POCOS CALDAS TRT4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  POCOS CALDAS TT 13,8/0 kV POCOS CALDAS TRT3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71

 

202 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  POCOS CALDAS TT 13,8/0 kV POCOS CALDAS TRT2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  POCOS CALDAS TT 13,8/0 kV POCOS CALDAS TRT1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 83,846.82
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 83,846.82
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR6 MG RBF FT TR 345/138 kV POCOS CALDAS TR6 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR5 MG RBF FT TR 345/138 kV POCOS CALDAS TR5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBNI REA 5861/2016 9/12/2021 8/12/2036 90,418.01
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBNI REA 5861/2016 9/12/2021 8/12/2036 90,418.01
  POCOS CALDAS MC 138 kV BC 138 kV 150 Mvar POCOS CALDAS BC1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,618.25
  POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBNI REA 5861/2016 10/2/2021 9/2/2036 101,334.66
  POCOS CALDAS MC 345 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBNI REA 5861/2016 10/2/2021 9/2/2036 101,334.66
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RMEL REN 643/2014 7/11/2016 6/11/2042 113,522.73
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-2 SP/MG DIT   062/2001 IPCA RCDM REA 2737/2011 27/05/2013 26/05/2038 120,159.40
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-1 SP/MG DIT   062/2001 IPCA RCDM REA 2737/2011 27/05/2013 26/05/2038 120,159.40
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-2 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV S.J.B.VISTA II /POCOS CALDAS C-1 SP/MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-2 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV POCOS CALDAS (D) /POCOS CALDAS C-1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV DME POCOS CAL /POCOS CALDAS C-2 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  POCOS CALDAS EL 138 kV POCOS CALDAS LT 138 kV DME POCOS CAL /POCOS CALDAS C-1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  POCOS CALDAS RTB 13,8 kV 25 Mvar POCOS CALDAS RT2 MG RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,322.24
  POCOS CALDAS RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG RBF FT RTB 13,8 kV 25 Mvar POCOS CALDAS RT1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,322.24
  POCOS CALDAS RTB 13,8 kV 50 Mvar POCOS CALDAS RT5 MG RB FT RTB 13,8 kV 50 Mvar POCOS CALDAS RT5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,505.07
  POCOS CALDAS RTB 13,8 kV 50 Mvar POCOS CALDAS RT4 MG RB FT RTB 13,8 kV 50 Mvar POCOS CALDAS RT4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 144,505.07
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBNI REA 5861/2016 8/8/2021 7/8/2036 150,786.60
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBNI REA 5861/2016 8/8/2021 7/8/2036 150,786.60
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TRR1 MG RBF FT TR 345/138 kV POCOS CALDAS TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,470.10
  POCOS CALDAS IB 345 kV MG 500 kV POCOS CALDAS MG1 MG IB1 RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  POCOS CALDAS BC 138 kV 150 Mvar POCOS CALDAS BC1 MG DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 207,546.87
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 207,970.83
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 207,970.83
  POCOS CALDAS MC 345 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR6 MG RBF FT TR 345/138 kV POCOS CALDAS TR6 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR5 MG RBF FT TR 345/138 kV POCOS CALDAS TR5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  POCOS CALDAS MC 345 kV BC 345 kV 150 Mvar POCOS CALDAS BC2 MG RB FT BC 345 kV 150 Mvar POCOS CALDAS BC2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 226,412.66
  POCOS CALDAS BC 345 kV 150 Mvar POCOS CALDAS BC2 MG RB FT BC 345 kV 150 Mvar POCOS CALDAS BC2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 228,905.73
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV L.C.BARRETO /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-2 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV GUARULHOS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-2 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV FURNAS /POCOS CALDAS C-1 MG RB FT LT 345 kV FURNAS /POCOS CALDAS C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  POCOS CALDAS IB 345 kV MG 500 kV POCOS CALDAS MG1 MG IB1 RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBNI REA 1814/2009 16/06/2012 15/06/2038 301,261.23
  POCOS CALDAS MC 500 kV TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBNI REA 1814/2009 6/3/2012 5/3/2038 339,070.21
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBNI REA 1814/2009 24/04/2012 23/04/2038 340,687.53
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  POCOS CALDAS EL 500 kV POCOS CALDAS LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG RB FT LT 500 kV ARARAQUARA FURNAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV ATIBAIA 2 /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBNI REA 2040/2009 22/11/2012 21/11/2037 397,697.40
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 400,362.62
  POCOS CALDAS MC 138 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 400,362.62
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBNI REA 1814/2009 26/02/2012 25/02/2037 409,535.24
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBNI REA 1814/2009 24/06/2012 23/06/2037 417,776.26
  POCOS CALDAS IB 345 kV MG 500 kV POCOS CALDAS MG1 MG IB1 RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 469,392.83
  POCOS CALDAS TR 500/345 kV POCOS CALDAS TRR1 MG RB FT TR 500/345 kV POCOS CALDAS TRR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 496,318.00
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR4 MG RBF FT TR 345/138 kV POCOS CALDAS TR4 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 580,410.30
  POCOS CALDAS RTL 500 kV 136 Mvar POCOS CALDAS RTIJ MG RB FT LT 500 kV POCOS CALDAS /ITAJUBA 3 C-1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 582,461.97
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR6 MG RBF FT TR 345/138 kV POCOS CALDAS TR6 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,335.86
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR5 MG RBF FT TR 345/138 kV POCOS CALDAS TR5 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,335.86
  POCOS CALDAS IB 345 kV MG 500 kV POCOS CALDAS MG1 MG IB1 RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 903,623.56
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR2 MG RBF FT TR 345/138 kV POCOS CALDAS TR2 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  POCOS CALDAS MC 345 kV TR 345/138 kV POCOS CALDAS TR1 MG RBF FT TR 345/138 kV POCOS CALDAS TR1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  POCOS CALDAS EL 345 kV POCOS CALDAS LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG RB FT LT 345 kV CAMPINAS /POCOS CALDAS C-1 SP/MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,196,446.96
  POCOS CALDAS TR 345/138 kV POCOS CALDAS TR3 MG RBF FT TR 345/138 kV POCOS CALDAS TR3 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,382,795.83
  POCOS CALDAS TR 500/345 kV POCOS CALDAS TR51 MG RB FT TR 500/345 kV POCOS CALDAS TR51 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,488,086.24
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,584,891.77
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,775,918.02
  POCOS CALDAS MG 500 kV POCOS CALDAS MG1 MG RB FT MG 500 kV POCOS CALDAS MG1 MG 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 7,268,982.93
  RIO CLARO MG 138 kV RIO CLARO MG1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2038 605,276.92

 

203 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  RIO CLARO EL 138 kV RIO CLARO LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2040 875,754.99
  RIO CLARO EL 138 kV RIO CLARO LT 138 kV RIO CLARO /PARQUE EMAS C-1 GO DIT   062/2001 IPCA RCDM REA 2367/2010 17/11/2013 16/11/2040 875,754.99
  RIO NOVO DO SUL MG 345 kV RIO NOVO DO SUL MG3 ES RB FT MG 345 kV RIO NOVO DO SUL MG3 ES 062/2001 IPCA RBNI DSP 1405/2022 1/7/2022 30/06/2053 111,295.82
  RIO NOVO DO SUL EL 345 kV RIO NOVO DO SUL LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RBNI DSP 1405/2022 1/7/2022 30/06/2050 198,248.03
  RIO NOVO DO SUL EL 345 kV RIO NOVO DO SUL LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES 062/2001 IPCA RBNI DSP 1405/2022 1/7/2022 30/06/2050 198,248.03
  RIO NOVO DO SUL EL 345 kV RIO NOVO DO SUL LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-2 RJ/ES 062/2001 IPCA RBNI DSP 1405/2022 1/7/2021 30/06/2050 198,248.03
  RIO NOVO DO SUL EL 345 kV RIO NOVO DO SUL LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES RB FT LT 345 kV CAMPOS /RIO NOVO DO SUL C-1 RJ/ES 062/2001 IPCA RBNI DSP 1405/2022 1/7/2022 30/06/2050 198,248.03
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RMEL REN 443/2011 24/08/2014 23/08/2038 2,037.18
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RMEL REN 443/2011 24/08/2014 23/08/2038 2,037.18
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RMEL REN 443/2011 24/08/2014 23/08/2038 2,037.18
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RMEL REN 443/2011 30/01/2015 29/01/2039 2,055.08
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RMEL REN 443/2011 30/01/2015 29/01/2039 2,055.08
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035 4,508.08
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035 4,508.08
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RMEL REN 443/2011 30/11/2014 29/11/2035 4,508.08
  RIO VERDE FUR MG 230 kV RIO VERDE FUR MG1 GO RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RMEL REN 443/2011 25/08/2017 24/08/2031 8,447.36
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /C. DOURADA C-2 GO DIT   062/2001 IPCA RMEL REN 643/2014 15/05/2016 14/05/2038 14,138.41
  RIO VERDE FUR MC 13,8 kV TR 230/138 kV RIO VERDE FUR TR2 GO RBF FT TR 230/138 kV RIO VERDE FUR TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 17,542.77
  RIO VERDE FUR MC 13,8 kV TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 17,542.77
  RIO VERDE FUR MC 230 kV TR 230/138 kV RIO VERDE FUR TR3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBNI REA 5484/2015 22/03/2019 21/03/2049 36,204.87
  RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  RIO VERDE FUR MC 13,8 kV RTB 13,8 kV 5 Mvar RIO VERDE FUR RT1 GO RBF FT RTB 13,8 kV 5 Mvar RIO VERDE FUR RT1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  RIO VERDE FUR MC 13,8 kV RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  RIO VERDE FUR MC 13,8 kV RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE CLG /RIO VERDE FUR C-1 GO DIT   062/2001 IPCA RCDM REA 2969/2011 13/01/2013 12/1/2038 50,156.79
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RCDM REA 2969/2011 3/11/2013 2/11/2039 51,309.38
  RIO VERDE FUR MC 13,8 kV BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  RIO VERDE FUR MC 13,8 kV BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  RIO VERDE FUR MC 13,8 kV BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  RIO VERDE FUR IB 138 kV MG 230 kV RIO VERDE FUR MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,442.16
  RIO VERDE FUR TT 13,8/0 kV RIO VERDE FUR TRT3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  RIO VERDE FUR TT 13,8/0 kV RIO VERDE FUR TRT2 GO RBF FT TR 230/138 kV RIO VERDE FUR TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  RIO VERDE FUR TT 13,8/0 kV RIO VERDE FUR TRT1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  RIO VERDE FUR MC 138 kV RTB 138 kV 15 Mvar RIO VERDE FUR RT4 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 82,961.50
  RIO VERDE FUR MC 138 kV TR 230/138 kV RIO VERDE FUR TR2 GO RBF FT TR 230/138 kV RIO VERDE FUR TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  RIO VERDE FUR MC 138 kV TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 87,293.01
  RIO VERDE FUR RTB 13,8 kV 5 Mvar RIO VERDE FUR RT1 GO RBF FT RTB 13,8 kV 5 Mvar RIO VERDE FUR RT1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 97,390.75
  RIO VERDE FUR IB 230 kV MG 230 kV RIO VERDE FUR MG1 GO IB1 RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,374.64
  RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC3 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,516.99
  RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,516.99
  RIO VERDE FUR BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO RBF FT BC 13,8 kV 10 Mvar RIO VERDE FUR BC1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,516.99
  RIO VERDE FUR RTB 230 kV 15 MVAr RIO VERDE FUR RTR2 GO RB FT RTB 230 kV 15 MVAr RIO VERDE FUR RTR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 112,549.13
  RIO VERDE FUR RTB 138 kV 15 Mvar RIO VERDE FUR RT4 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 119,869.99
  RIO VERDE FUR MC 230 kV RTB 230 kV 45 MVAr RIO VERDE FUR RT5 GO RB FT RTB 230 kV 45 MVAr RIO VERDE FUR RT5 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 120,652.30
  RIO VERDE FUR MC 230 kV TR 230/138 kV RIO VERDE FUR TR2 GO RBF FT TR 230/138 kV RIO VERDE FUR TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  RIO VERDE FUR MC 230 kV TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /RIO CLARO C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE FUR /C. DOURADA C-2 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  RIO VERDE FUR EL 138 kV RIO VERDE FUR LT 138 kV RIO VERDE CLG /RIO VERDE FUR C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  RIO VERDE FUR EL 138 kV RIO VERDE FUR  PERDIGAO C1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  RIO VERDE FUR RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,322.24
  RIO VERDE FUR RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 130,322.24
  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TRR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TRR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 140,616.89
  RIO VERDE FUR CR 230 kV 34 Mvar RIO VERDE FUR BC3 GO RB FT CR 230 kV 34 Mvar RIO VERDE FUR BC3 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 143,797.02
  RIO VERDE FUR CR 230 kV 37,2 Mvar RIO VERDE FUR BC1 GO RB FT CR 230 kV 37,2 Mvar RIO VERDE FUR BC1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 149,321.71
  RIO VERDE FUR IB 138 kV MG 230 kV RIO VERDE FUR MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 160,677.26
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-1 GO/MT 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO RB FT LT 230 kV RIO VERDE FUR /C. DOURADA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-1 MG/GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  RIO VERDE FUR MG 230 kV RIO VERDE FUR MG1 GO RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RBNI REA 2969/2011 30/01/2013 29/01/2036 201,735.70
  RIO VERDE FUR IB 138 kV MG 230 kV RIO VERDE FUR MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 309,318.22
  RIO VERDE FUR RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT3 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 310,485.62
  RIO VERDE FUR RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO RBF FT RTB 13,8 kV 25 Mvar RIO VERDE FUR RT2 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 310,485.62
  RIO VERDE FUR MC 138 kV TR 230/138 kV RIO VERDE FUR TR3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBNI REA 2367/2010 10/10/2012 9/10/2039 316,033.14
  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TRR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 335,012.06
  RIO VERDE FUR RTB 230 kV 45 MVAr RIO VERDE FUR RT5 GO RB FT RTB 230 kV 45 MVAr RIO VERDE FUR RT5 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 337,647.40
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 418,034.07
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 418,034.07
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO RB FT LT 230 kV ITUMBIARA /RIO VERDE FUR C-2 MG/GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 418,034.07
  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TR2 GO RBF FT TR 230/138 kV RIO VERDE FUR TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 423,516.12
  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 423,516.12
  RIO VERDE FUR CR 230 kV 216 Mvar RIO VERDE FUR BC2 GO RB FT CR 230 kV 216 Mvar RIO VERDE FUR BC2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 458,013.95
  RIO VERDE FUR MG 230 kV RIO VERDE FUR MG1 GO RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 477,112.58
  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TRR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 644,928.44
  RIO VERDE FUR MC 138 kV TR 230/138 kV RIO VERDE FUR TR3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBNI REA 2367/2010 10/10/2012 9/10/2038 732,133.83
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /RONDONOPOLIS C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 804,753.31
  RIO VERDE FUR EL 230 kV RIO VERDE FUR LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT RB FT LT 230 kV RIO VERDE FUR /BARRA PEIXE C-2 GO/MT 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 804,753.31
  RIO VERDE FUR MC 230 kV TR 230/138 kV RIO VERDE FUR TR3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBNI REA 2367/2010 10/10/2012 9/10/2038 934,504.51
  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,009,004.02
  RIO VERDE FUR MG 230 kV RIO VERDE FUR MG1 GO RB FT MG 230 kV RIO VERDE FUR MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,136,694.64
  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TR1 GO RBF FT TR 230/138 kV RIO VERDE FUR TR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,942,423.79

 

204 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  RIO VERDE FUR TR 230/138 kV RIO VERDE FUR TR3 GO RBF FT TR 230/138 kV RIO VERDE FUR TR3 GO 062/2001 IPCA RBNI REA 2367/2010 10/10/2012 9/10/2041 1,964,330.82
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 29/09/2015 28/09/2036 4,533.21
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 29/09/2015 28/09/2036 4,533.21
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 443/2011 29/09/2015 28/09/2036 4,533.21
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 12/5/2015 11/5/2036 13,434.76
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST1 DIT   062/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2036 13,583.09
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 23/09/2015 22/09/2036 13,591.38
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 29/09/2015 28/09/2036 13,599.64
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 12/1/2016 11/1/2038 13,712.05
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST2 DIT   062/2001 IPCA RMEL REN 643/2014 9/3/2016 8/3/2038 13,773.05
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 15/09/2015 14/09/2042 25,703.42
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 6/11/2015 5/11/2043 25,794.61
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 19/12/2015 18/12/2043 25,875.47
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 19/04/2016 18/04/2044 26,090.49
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 19/04/2016 18/04/2044 26,090.49
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 20/04/2016 19/04/2044 26,092.56
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 20/04/2016 19/04/2044 26,092.56
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST2 DIT   062/2001 IPCA RMEL REN 643/2014 19/11/2016 18/11/2045 26,455.93
  ROCHA LEAO IB 138 kV MG 138 kV ROCHA LEAO MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 443/2011 6/2/2017 5/2/2046 27,395.39
  ROCHA LEAO IB 138 kV MG 138 kV ROCHA LEAO MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 443/2011 6/2/2017 5/2/2046 27,395.39
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 15/09/2015 14/09/2042 37,251.34
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 6/11/2015 5/11/2043 37,383.51
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 18/12/2015 17/12/2043 37,497.63
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RCDM REN 643/2014 15/11/2013 14/11/2037 62,311.28
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RCDM REN 643/2014 14/12/2013 13/12/2037 62,474.46
  ROCHA LEAO IB 138 kV MG 138 kV ROCHA LEAO MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 67,442.16
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST1 DIT   062/2001 IPCA RMEL REN 643/2014 17/09/2015 16/09/2040 72,014.25
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST2 DIT   062/2001 IPCA RMEL REN 643/2014 4/12/2015 3/12/2041 72,415.32
  ROCHA LEAO MC 138 kV BC 138 kV 75 Mvar ROCHA LEAO BC2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 85,627.81
  ROCHA LEAO MC 138 kV BC 138 kV 75 Mvar ROCHA LEAO BC1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 85,627.81
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 15/09/2015 14/09/2045 113,221.48
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 6/11/2015 5/11/2046 113,596.34
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 18/12/2015 17/12/2046 113,917.73
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV IRIRI /ROCHA LEAO C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV CAMPOS /ROCHA LEAO C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,162.12
  ROCHA LEAO IB 138 kV MG 138 kV ROCHA LEAO MG1 RJ IB1 DIT   062/2001 IPCA RMEL REN 643/2014 21/04/2016 20/04/2046 146,736.45
  ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 165,923.92
  ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 165,923.92
  ROCHA LEAO EL 138 kV ROCHA LEAO LT 138 kV ROCHA LEAO /MAGE C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 8/3/2016 7/3/2046 178,159.05
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST2 DIT   062/2001 IPCA RMEL REN 643/2014 15/06/2016 14/06/2046 179,301.78
  ROCHA LEAO MG 138 kV ROCHA LEAO MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 265,093.06
  ROCHA LEAO EL 138 kV ROCHA LEAO  DIST1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 310,104.14
  ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 395,304.68
  ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 395,304.68
  ROCHA LEAO MG 138 kV ROCHA LEAO MG1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 631,569.72
  ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 760,997.18
  ROCHA LEAO BC 138 kV 75 Mvar ROCHA LEAO BC1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 760,997.18
  S.DA MESA MC 69 kV RTN 69 kV 0,5 Mvar S.DA MESA RTTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,280.55
  S.DA MESA MC 69 kV RTN 69 kV 0,5 Mvar S.DA MESA RTNSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,280.55
  S.DA MESA MC 69 kV RTN 69 kV 0,5 Mvar S.DA MESA RTNSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,280.55
  S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RMEL REN 443/2011 8/12/2017 7/12/2032 9,344.58
  S.DA MESA RTN 69 kV 0,5 Mvar S.DA MESA RTTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,718.23
  S.DA MESA RTN 69 kV 0,5 Mvar S.DA MESA RTNSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,718.23
  S.DA MESA RTN 69 kV 0,5 Mvar S.DA MESA RTNSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,718.23
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBNI REA 5861/2016 24/11/2020 23/11/2035 15,642.27
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBNI REA 5861/2016 13/03/2021 12/3/2036 15,753.81
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBNI REA 5861/2016 14/03/2021 13/03/2036 15,754.84
  S.DA MESA EL 230 kV S.DA MESA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBNI REA 3578/2012 22/04/2019 21/04/2049 25,207.96
  S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBNI REA 6370/2017 15/12/2020 15/12/2051 26,579.95
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBNI REA 8314/2019 24/11/2020 23/11/2035 30,532.17
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBNI REA 8314/2019 13/03/2021 12/3/2036 30,749.90
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBNI REA 8314/2019 14/03/2021 13/03/2036 30,751.89
  S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBNI REA 8314/2019 24/11/2020 23/11/2035 52,778.17
  S.DA MESA IB 138 kV MG 500 kV S.DA MESA MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  S.DA MESA MC 138 kV TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  S.DA MESA MC 138 kV TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  S.DA MESA MC 138 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  S.DA MESA IB 230 kV MG 500 kV S.DA MESA MG1 GO IB1 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,374.64
  S.DA MESA TR 230/138 kV S.DA MESA TRR1 GO RBF FT TR 230/138 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 103,978.51
  S.DA MESA MC 230 kV TR 500/230 kV S.DA MESA TR2 GO RB FT TR 500/230 kV S.DA MESA TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  S.DA MESA MC 230 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 125,809.97
  S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBNI REA 5148/2015 25/07/2018 25/07/2050 133,708.30
  S.DA MESA EL 138 kV S.DA MESA LT 138 kV PORANGATU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  S.DA MESA EL 138 kV S.DA MESA LT 138 kV MINACU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031 160,725.79
  S.DA MESA EL 230 kV S.DA MESA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 175,464.29
  S.DA MESA IB 138 kV MG 500 kV S.DA MESA MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 179,725.83
  S.DA MESA MC 500 kV RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,061.65
  S.DA MESA MC 500 kV RTL 500 kV 136 Mvar S.DA MESA RTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,061.65

 

205 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  S.DA MESA MC 500 kV RTL 500 kV 136 Mvar S.DA MESA RTSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,061.65
  S.DA MESA MC 500 kV CR 500 kV 107 MVAr S.DA MESA BC1 GO RB FT CR 500 kV 107 MVAr S.DA MESA BC1 GO 062/2001 IPCA RBNI REA 6370/2017 15/12/2020 15/12/2046 198,405.64
  S.DA MESA MC 138 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 224,165.84
  S.DA MESA RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO RB FT RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 224,791.18
  S.DA MESA IB 230 kV MG 500 kV S.DA MESA MG1 GO IB1 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 246,284.42
  S.DA MESA TR 230/138 kV S.DA MESA TRR1 GO RBF FT TR 230/138 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 247,723.12
  S.DA MESA MC 230 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 299,735.38
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 299,735.38
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 299,735.38
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 299,735.38
  S.DA MESA TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 308,654.02
  S.DA MESA TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 308,654.02
  S.DA MESA TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 308,654.02
  S.DA MESA MC 500 kV TR 500/230 kV S.DA MESA TR2 GO RB FT TR 500/230 kV S.DA MESA TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  S.DA MESA MC 500 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  S.DA MESA EL 138 kV S.DA MESA LT 138 kV PORANGATU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  S.DA MESA EL 138 kV S.DA MESA LT 138 kV MINACU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  S.DA MESA IB 500 kV MG 500 kV S.DA MESA MG1 GO IB5 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  S.DA MESA IB 500 kV MG 500 kV S.DA MESA MG1 GO IB4 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  S.DA MESA IB 500 kV MG 500 kV S.DA MESA MG1 GO IB3 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  S.DA MESA IB 500 kV MG 500 kV S.DA MESA MG1 GO IB2 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  S.DA MESA IB 500 kV MG 500 kV S.DA MESA MG1 GO IB1 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  S.DA MESA IB 138 kV MG 500 kV S.DA MESA MG1 GO IB1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 345,988.44
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  S.DA MESA EL 230 kV S.DA MESA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 418,034.07
  S.DA MESA TR 500/230 kV S.DA MESA TRR1 GO RB FT TR 500/230 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 420,668.19
  S.DA MESA MC 138 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 431,539.47
  S.DA MESA RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 464,829.87
  S.DA MESA IB 230 kV MG 500 kV S.DA MESA MG1 GO IB1 RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 474,119.73
  S.DA MESA TR 230/138 kV S.DA MESA TRR1 GO RBF FT TR 230/138 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 476,889.36
  S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBNIA REA 6153/2016     503,895.03
  S.DA MESA RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO RB FT RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 535,552.70
  S.DA MESA MC 230 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 577,017.66
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 577,017.66
  S.DA MESA MC 230 kV TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 577,017.66
  S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 582,461.97
  S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 582,461.97
  S.DA MESA EL 138 kV S.DA MESA LT 138 kV PORANGATU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 630,256.63
  S.DA MESA EL 138 kV S.DA MESA LT 138 kV MINACU /S.DA MESA C-1 GO DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 630,256.63
  S.DA MESA EL 230 kV S.DA MESA LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-2 GO 028/2009 IPCA RBL CC 028/2009 27/09/2017 19/11/2039 676,326.91
  S.DA MESA TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 735,351.33
  S.DA MESA TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 735,351.33
  S.DA MESA TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 735,351.33
  S.DA MESA MC 230 kV BC 230 kV 150 Mvar S.DA MESA BC2 GO RB FT BC 230 kV 150 Mvar S.DA MESA BC2 GO 062/2001 IPCA RBNI REA 5148/2015 25/07/2018 25/07/2042 738,743.05
  S.DA MESA MC 230 kV BC 230 kV 150 Mvar S.DA MESA BC1 GO RB FT BC 230 kV 150 Mvar S.DA MESA BC1 GO 062/2001 IPCA RBNI REA 5148/2015 25/07/2018 25/07/2042 738,743.05
  S.DA MESA MC 500 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  S.DA MESA EL 230 kV S.DA MESA LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO RB FT LT 230 kV S.DA MESA /NIQUELANDIA C-1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 804,753.31
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 869,108.22
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 869,108.22
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 869,108.22
  S.DA MESA TR 500/230 kV S.DA MESA TRR1 GO RB FT TR 500/230 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,002,218.96
  S.DA MESA RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO RB FT RTL 500 kV 24,45 Mvar S.DA MESA RTR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,030,987.29
  S.DA MESA RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,107,431.77
  S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,156,898.65
  S.DA MESA BC 230 kV 150 Mvar S.DA MESA BC2 GO RB FT BC 230 kV 150 Mvar S.DA MESA BC2 GO 062/2001 IPCA RBNI REA 5148/2015 25/07/2018 25/07/2038 1,249,671.14
  S.DA MESA BC 230 kV 150 Mvar S.DA MESA BC1 GO RB FT BC 230 kV 150 Mvar S.DA MESA BC1 GO 062/2001 IPCA RBNI REA 5148/2015 25/07/2018 25/07/2038 1,249,671.14
  S.DA MESA TR 500/230 kV S.DA MESA TR2 GO RB FT TR 500/230 kV S.DA MESA TR2 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,263,161.15
  S.DA MESA TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,263,161.15
  S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,387,683.81
  S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,387,683.81
  S.DA MESA TR 230/138 kV S.DA MESA TR6 GO RBF FT TR 230/138 kV S.DA MESA TR6 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,415,617.68
  S.DA MESA TR 230/138 kV S.DA MESA TR5 GO RBF FT TR 230/138 kV S.DA MESA TR5 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,415,617.68
  S.DA MESA TR 230/138 kV S.DA MESA TR4 GO RBF FT TR 230/138 kV S.DA MESA TR4 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,415,617.68
  S.DA MESA MC 500 kV TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,476,675.82
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,673,111.75
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,673,111.75
  S.DA MESA EL 500 kV S.DA MESA LT 500 kV S.DA MESA /GURUPI C-1 GO/TO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,673,111.75
  S.DA MESA TR 500/230 kV S.DA MESA TRR1 GO RB FT TR 500/230 kV S.DA MESA TRR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,929,361.95
  S.DA MESA RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO RB FT RTL 500 kV 73,4 Mvar S.DA MESA RTSMSB1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,131,906.10
  S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMSB2 GO RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,671,416.57
  S.DA MESA RTL 500 kV 136 Mvar S.DA MESA RTSMGU1 GO RB FT LT 500 kV S.DA MESA /GURUPI C-1 GO/TO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,671,416.57
  S.DA MESA TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,009,412.39
  S.DA MESA MG 500 kV S.DA MESA MG1 GO RB FT MG 500 kV S.DA MESA MG1 GO 062/2001 IPCA RBNIA REA 6153/2016     3,721,520.63
  S.DA MESA TR 500/230 kV S.DA MESA TR1 GO RB FT TR 500/230 kV S.DA MESA TR1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 5,793,390.44
  S.DA MESA CR 500 kV 107 MVAr S.DA MESA BC1 GO RB FT CR 500 kV 107 MVAr S.DA MESA BC1 GO 062/2001 IPCA RBNI REA 6370/2017 15/12/2020 15/12/2040 7,873,697.38
  SAMAMBAIA MC 69 kV RTN 69 kV 0,5 Mvar SAMAMBAIA RTNSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,280.55
  SAMAMBAIA MC 69 kV RTN 69 kV 0,5 Mvar SAMAMBAIA RTNSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 7,280.55
  SAMAMBAIA RTN 69 kV 0,5 Mvar SAMAMBAIA RTNSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,718.23
  SAMAMBAIA RTN 69 kV 0,5 Mvar SAMAMBAIA RTNSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 10,718.23
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR3 DF RB FT TR 500/345 kV SAMAMBAIA TR3 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2051 26,538.51
  SAMAMBAIA IB 345 kV MG 500 kV SAMAMBAIA MG2 DF IB1 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 4068/2013 8/11/2015 7/11/2043 75,296.94
  SAMAMBAIA IB 138 kV MG 500 kV SAMAMBAIA MG1 DF IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBNI REA 4068/2013 2/11/2015 1/11/2043 75,981.26
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBNI REA 4068/2013 1/11/2015 31/10/2043 76,002.71

 

206 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  SAMAMBAIA MC 138 kV TR 345/138 kV SAMAMBAIA TR5 DF RBF FT TR 345/138 kV SAMAMBAIA TR5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  SAMAMBAIA MC 138 kV TR 345/138 kV SAMAMBAIA TR4 DF RBF FT TR 345/138 kV SAMAMBAIA TR4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 6247/2017 6/4/2020 6/4/2052 127,489.85
  SAMAMBAIA EL 138 kV SAMAMBAIA LT 138 kV BRAS. NORTE /SAMAMBAIA C-1 DF DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAMAMBAIA EL 138 kV SAMAMBAIA  SUDOESTE DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAMAMBAIA EL 138 kV SAMAMBAIA  RIO VERMELHO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAMAMBAIA EL 138 kV SAMAMBAIA  RIACHO FUNDO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAMAMBAIA EL 138 kV SAMAMBAIA  MONJOLO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2051 145,204.52
  SAMAMBAIA MC 500 kV RTL 500 kV 89,1 Mvar SAMAMBAIA RTSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,061.65
  SAMAMBAIA MC 500 kV RTL 500 kV 136 Mvar SAMAMBAIA RTSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,061.65
  SAMAMBAIA IB 345 kV MG 500 kV SAMAMBAIA MG2 DF IB1 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  SAMAMBAIA MC 345 kV BC 345 kV 150 Mvar SAMAMBAIA BC5 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  SAMAMBAIA MC 345 kV BC 345 kV 150 Mvar SAMAMBAIA BC4 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR3 DF RB FT TR 500/345 kV SAMAMBAIA TR3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  SAMAMBAIA MC 345 kV TR 345/138 kV SAMAMBAIA TR5 DF RBF FT TR 345/138 kV SAMAMBAIA TR5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  SAMAMBAIA MC 345 kV TR 345/138 kV SAMAMBAIA TR4 DF RBF FT TR 345/138 kV SAMAMBAIA TR4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 222,031.01
  SAMAMBAIA BC 345 kV 150 Mvar SAMAMBAIA BC5 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 228,905.73
  SAMAMBAIA BC 345 kV 150 Mvar SAMAMBAIA BC4 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 228,905.73
  SAMAMBAIA TR 345/138 kV SAMAMBAIA TRR2 DF RBF FT TR 345/138 kV SAMAMBAIA TRR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 236,778.62
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 260,867.16
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 2837/2011 6/4/2016 5/4/2042 294,233.17
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR3 DF RB FT TR 500/345 kV SAMAMBAIA TR3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2051 341,571.06
  SAMAMBAIA IB 500 kV MG 500 kV SAMAMBAIA MG2 DF IB4 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  SAMAMBAIA IB 500 kV MG 500 kV SAMAMBAIA MG2 DF IB3 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RMEL REN 443/2011 25/04/2017 24/04/2031 408,687.72
  SAMAMBAIA MC 138 kV TR 345/138 kV SAMAMBAIA TR8 DF RBF FT TR 345/138 kV SAMAMBAIA TR8 DF 062/2001 IPCA RBNI REA 3893/2013 29/09/2016 28/09/2045 450,262.99
  SAMAMBAIA IB 345 kV MG 500 kV SAMAMBAIA MG2 DF IB1 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 469,392.83
  SAMAMBAIA RTL 500 kV 89,1 Mvar SAMAMBAIA RTSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 501,801.04
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 528,976.73
  SAMAMBAIA BC 345 kV 150 Mvar SAMAMBAIA BC5 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC5 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 545,355.38
  SAMAMBAIA RTL 500 kV 136 Mvar SAMAMBAIA RTSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 582,461.97
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TRR1 DF RB FT TR 500/345 kV SAMAMBAIA TRR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 597,941.88
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 621,501.75
  SAMAMBAIA MC 500 kV CR 500 kV 252 Mvar SAMAMBAIA BC2 DF RB FT CR 500 kV 252 Mvar SAMAMBAIA BC2 DF 062/2001 IPCA RBNI REA 6247/2017 6/4/2020 6/4/2044 661,423.14
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 3893/2013 29/09/2016 28/09/2045 662,203.60
  SAMAMBAIA MC 500 kV CR 500 kV 270 Mvar SAMAMBAIA BC1 DF RB FT CR 500 kV 270 Mvar SAMAMBAIA BC1 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2043 700,779.32
  SAMAMBAIA TR 345/138 kV SAMAMBAIA TR5 DF RBF FT TR 345/138 kV SAMAMBAIA TR5 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,335.86
  SAMAMBAIA TR 345/138 kV SAMAMBAIA TR4 DF RBF FT TR 345/138 kV SAMAMBAIA TR4 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,335.86
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  SAMAMBAIA MC 500 kV CR 500 kV 252 Mvar SAMAMBAIA BC3 DF RB FT CR 500 kV 252 Mvar SAMAMBAIA BC3 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2043 795,485.97
  SAMAMBAIA MC 138 kV TR 345/138 kV SAMAMBAIA TR6 DF RBF FT TR 345/138 kV SAMAMBAIA TR6 DF 062/2001 IPCA RBNI REA 1938/2009 10/10/2012 9/10/2038 829,452.68
  SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 869,108.22
  SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 869,108.22
  SAMAMBAIA IB 345 kV MG 500 kV SAMAMBAIA MG2 DF IB1 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 903,623.56
  SAMAMBAIA EL 138 kV SAMAMBAIA  SAMAM. OESTE C1 DIT   062/2001 IPCA RCDM REA 2837/2011 6/4/2016 5/4/2045 914,935.70
  SAMAMBAIA EL 138 kV SAMAMBAIA  SAMAM. OESTE C2 DIT   062/2001 IPCA RCDM REA 2837/2011 6/4/2016 5/4/2045 923,807.01
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,018,327.95
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2043 1,022,011.52
  SAMAMBAIA BC 345 kV 150 Mvar SAMAMBAIA BC5 DF RB FT BC 345 kV 150 Mvar SAMAMBAIA BC5 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,049,858.32
  SAMAMBAIA RTL 500 kV 89,1 Mvar SAMAMBAIA RTSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,195,513.56
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,196,446.96
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF RB FT LT 345 kV BRAS. SUL /SAMAMBAIA C-1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,196,446.96
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,196,446.96
  SAMAMBAIA EL 345 kV SAMAMBAIA LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF RB FT LT 345 kV BANDEIRANTES /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,196,446.96
  SAMAMBAIA RTL 500 kV 136 Mvar SAMAMBAIA RTSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,387,683.81
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,409,564.03
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TRR1 DF RB FT TR 500/345 kV SAMAMBAIA TRR1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,424,563.84
  SAMAMBAIA MC 345 kV TR 345/138 kV SAMAMBAIA TR6 DF RBF FT TR 345/138 kV SAMAMBAIA TR6 DF 062/2001 IPCA RBNI REA 1938/2009 10/10/2012 9/10/2039 1,452,433.81
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,476,675.82
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,476,675.82
  SAMAMBAIA IB 500 kV MG 500 kV SAMAMBAIA MG2 DF IB2 RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2047 1,651,950.54
  SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,673,111.75
  SAMAMBAIA EL 500 kV SAMAMBAIA LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,673,111.75
  SAMAMBAIA MC 345 kV TR 500/345 kV SAMAMBAIA TR7 DF RB FT TR 500/345 kV SAMAMBAIA TR7 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2046 1,706,425.19
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR3 DF RB FT TR 500/345 kV SAMAMBAIA TR3 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,793,825.63
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,793,825.63
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,793,825.63
  SAMAMBAIA MC 345 kV TR 345/138 kV SAMAMBAIA TR8 DF RBF FT TR 345/138 kV SAMAMBAIA TR8 DF 062/2001 IPCA RBNI REA 3893/2013 29/09/2016 28/09/2046 2,050,511.27
  SAMAMBAIA MC 500 kV TR 500/345 kV SAMAMBAIA TR7 DF RB FT TR 500/345 kV SAMAMBAIA TR7 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2046 2,093,250.95

 

207 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  SAMAMBAIA RTL 500 kV 89,1 Mvar SAMAMBAIA RTSMSB1 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-1 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,301,471.49
  SAMAMBAIA RTL 500 kV 136 Mvar SAMAMBAIA RTSMSB2 DF RB FT LT 500 kV S.DA MESA /SAMAMBAIA C-2 GO/DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,671,416.57
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TRR1 DF RB FT TR 500/345 kV SAMAMBAIA TRR1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,742,413.95
  SAMAMBAIA TR 345/138 kV SAMAMBAIA TR6 DF RBF FT TR 345/138 kV SAMAMBAIA TR6 DF 062/2001 IPCA RBNI REA 1938/2009 10/10/2012 9/10/2041 2,749,398.04
  SAMAMBAIA TR 345/138 kV SAMAMBAIA TR8 DF RBF FT TR 345/138 kV SAMAMBAIA TR8 DF 062/2001 IPCA RBNI REA 3893/2013 29/09/2016 28/09/2049 3,016,919.30
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,358,209.26
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RMEL REA 11449/2022 5/5/2022 5/5/2057 3,997,352.05
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,273,691.51
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 4,273,691.51
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR7 DF RB FT TR 500/345 kV SAMAMBAIA TR7 DF 062/2001 IPCA RBNI REA 3814/2012 27/07/2016 26/07/2049 5,781,138.62
  SAMAMBAIA MG 500 kV SAMAMBAIA MG2 DF RB FT MG 500 kV SAMAMBAIA MG2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,464,855.89
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR2 DF RB FT TR 500/345 kV SAMAMBAIA TR2 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 8,227,241.84
  SAMAMBAIA TR 500/345 kV SAMAMBAIA TR1 DF RB FT TR 500/345 kV SAMAMBAIA TR1 DF 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 8,227,241.84
  SAMAMBAIA CR 500 kV 252 Mvar SAMAMBAIA BC3 DF RB FT CR 500 kV 252 Mvar SAMAMBAIA BC3 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2039 15,093,429.95
  SAMAMBAIA CR 500 kV 252 Mvar SAMAMBAIA BC2 DF RB FT CR 500 kV 252 Mvar SAMAMBAIA BC2 DF 062/2001 IPCA RBNI REA 6247/2017 6/4/2020 6/4/2040 15,261,272.93
  SAMAMBAIA CR 500 kV 270 Mvar SAMAMBAIA BC1 DF RB FT CR 500 kV 270 Mvar SAMAMBAIA BC1 DF 062/2001 IPCA RBNI REA 6247/2017 26/11/2019 26/11/2039 22,038,235.42
  SANTA CRUZ MG 138 kV SANTA CRUZ MG1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2045 3,384.57
  SANTA CRUZ MG 138 kV SANTA CRUZ MG1 RJ DIT   062/2001 IPCA RMEL REN 443/2011 5/10/2015 4/10/2028 54,008.20
  SANTA CRUZ IB 138 kV MG 138 kV SANTA CRUZ MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  SANTA CRUZ MC 138 kV TR 19/138 kV SANTA CRUZ TRG4 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  SANTA CRUZ MC 138 kV TR 19/138 kV SANTA CRUZ TRG3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  SANTA CRUZ MC 138 kV TR 16,5/138 kV SANTA CRUZ TR11 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  SANTA CRUZ MC 138 kV TR 138/34,5 kV SANTA CRUZ TR34 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  SANTA CRUZ MC 138 kV TR 138/34,5 kV SANTA CRUZ TR12 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  SANTA CRUZ MC 138 kV TR 13,2/138 kV SANTA CRUZ TRG2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  SANTA CRUZ MC 138 kV TR 13,2/138 kV SANTA CRUZ TRG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  SANTA CRUZ TR 138/34,5 kV SANTA CRUZ TR34 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 105,859.79
  SANTA CRUZ TR 138/34,5 kV SANTA CRUZ TR12 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 114,639.72
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /ZONA OESTE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /ZONA INDUSTR. C-3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /ZONA INDUSTR. C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /ZONA INDUSTR. C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /PALMARES C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /PALMARES C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /BRISAMAR C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV SANTA CRUZ /BRISAMAR C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SANTA CRUZ EL 138 kV SANTA CRUZ LT 138 kV ANGRA FUR /SANTA CRUZ C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SANTA CRUZ IB 138 kV MG 138 kV SANTA CRUZ MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 179,725.83
  SANTA CRUZ MC 138 kV TR 19/138 kV SANTA CRUZ TRG4 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 224,165.84
  SANTA CRUZ MC 138 kV TR 16,5/138 kV SANTA CRUZ TR11 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 224,165.84
  SANTA CRUZ MC 138 kV TR 138/34,5 kV SANTA CRUZ TR34 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 224,165.84
  SANTA CRUZ IB 138 kV MG 138 kV SANTA CRUZ MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 345,988.44
  SANTA CRUZ MG 138 kV SANTA CRUZ MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 367,861.84
  SANTA CRUZ MC 138 kV TR 19/138 kV SANTA CRUZ TRG4 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 431,539.47
  SANTA CRUZ MC 138 kV TR 16,5/138 kV SANTA CRUZ TR11 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 431,539.47
  SANTA CRUZ MC 138 kV TR 138/34,5 kV SANTA CRUZ TR34 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 431,539.47
  SAO GONCALO TR 69/13,8 kV SAO GONCALO TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 21,166.07
  SAO GONCALO TR 69/13,8 kV SAO GONCALO TR1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 21,166.07
  SAO GONCALO MC 13,8 kV TR 69/13,8 kV SAO GONCALO TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,694.77
  SAO GONCALO MC 13,8 kV TR 69/13,8 kV SAO GONCALO TR1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 34,694.77
  SAO GONCALO MC 13,8 kV TR 13,8/0,48 kV SAO GONCALO TR3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 37,654.76
  SAO GONCALO EL 13,8 kV SAO GONCALO  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,803.25
  SAO GONCALO EL 13,8 kV SAO GONCALO  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,803.25
  SAO GONCALO EL 13,8 kV SAO GONCALO  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 38,803.25
  SAO GONCALO MC 69 kV TR 69/13,8 kV SAO GONCALO TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,620.69
  SAO GONCALO MC 69 kV TR 69/13,8 kV SAO GONCALO TR1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 43,620.69
  SAO GONCALO EL 69 kV SAO GONCALO  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 53,831.35
  SAO GONCALO MG 69 kV SAO GONCALO MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 166,309.96
  SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 1,429.11
  SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RMEL REN 443/2011 14/03/2016 13/03/2029 9,444.07
  SAO JOSE EL 138 kV SAO JOSE  VILAR TELES C1 DIT   062/2001 IPCA RMEL REN 643/2014 8/9/2015 7/9/2040 41,963.80
  SAO JOSE TT 13,8/0 kV SAO JOSE TRT14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  SAO JOSE TT 13,8/0 kV SAO JOSE TRT13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  SAO JOSE TT 13,8/0 kV SAO JOSE TRT12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  SAO JOSE TT 13,8/0 kV SAO JOSE TRT11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  SAO JOSE MC 138 kV BC 138 kV 150 Mvar SAO JOSE BC3 RJ BC3/BC4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 89,164.51
  SAO JOSE MC 138 kV BC 138 kV 150 Mvar SAO JOSE BC1 RJ BC1/BC2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 89,164.51
  SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 94,090.65
  SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBNI REA 2837/2011 18/06/2016 17/06/2044 98,220.56
  SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBNI REA 2837/2011 18/06/2016 17/06/2044 98,220.56
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV TRIAGEM /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV TRIAGEM /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV SAO JOSE /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV SAO JOSE /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93

 

208 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CASCADURA /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CASCADURA /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAO JOSE EL 138 kV SAO JOSE  VILAR TELES C1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAO JOSE EL 138 kV SAO JOSE  ILHA POMBOS C1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 137,417.93
  SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB2 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 179,725.83
  SAO JOSE IB 138 kV MG 500 kV SAO JOSE MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 179,725.83
  SAO JOSE BC 138 kV 100 Mvar SAO JOSE BC4 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 183,199.01
  SAO JOSE BC 138 kV 100 Mvar SAO JOSE BC2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 183,199.01
  SAO JOSE BC 138 kV 150 Mvar SAO JOSE BC3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 207,546.87
  SAO JOSE BC 138 kV 150 Mvar SAO JOSE BC1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 207,546.87
  SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 224,165.84
  SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 224,165.84
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV TRIAGEM /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV TRIAGEM /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV SAO JOSE /MAGE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV SAO JOSE /MAGE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV IMBARIE /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV IMBARIE /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CASCADURA /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CASCADURA /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 327,390.70
  SAO JOSE IB 500 kV MG 500 kV SAO JOSE MG1 RJ IB3 RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  SAO JOSE IB 500 kV MG 500 kV SAO JOSE MG1 RJ IB2 RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  SAO JOSE IB 500 kV MG 500 kV SAO JOSE MG1 RJ IB1 RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  SAO JOSE EL 500 kV SAO JOSE LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  SAO JOSE EL 500 kV SAO JOSE LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 431,539.47
  SAO JOSE BC 138 kV 100 Mvar SAO JOSE BC4 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 436,461.63
  SAO JOSE BC 138 kV 100 Mvar SAO JOSE BC2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 436,461.63
  SAO JOSE TR 500/138 kV SAO JOSE TRR1 RJ RBF FT TR 500/138 kV SAO JOSE TRR1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 459,791.61
  SAO JOSE BC 138 kV 150 Mvar SAO JOSE BC3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 494,469.09
  SAO JOSE BC 138 kV 150 Mvar SAO JOSE BC1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 494,469.09
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBNI REA 7761/2019 14/09/2021 13/09/2036 528,021.17
  SAO JOSE MC 138 kV TR 500/138 kV SAO JOSE TR13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBNI REA 7761/2019 14/09/2021 13/09/2036 528,021.17
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 630,256.63
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV GOV.L.BRIZOLA /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 630,256.63
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-2 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 630,256.63
  SAO JOSE EL 138 kV SAO JOSE LT 138 kV CORDOVIL /SAO JOSE C-1 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 630,256.63
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  SAO JOSE EL 500 kV SAO JOSE LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 869,108.22
  SAO JOSE EL 500 kV SAO JOSE LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 869,108.22
  SAO JOSE EL 138 kV SAO JOSE  W. LUIZ DIT   062/2001 IPCA RCDM REA 2837/2011 18/06/2016 17/06/2045 926,261.24
  SAO JOSE EL 138 kV SAO JOSE  ROSALI DIT   062/2001 IPCA RCDM REA 2837/2011 18/06/2016 17/06/2045 926,261.24
  SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,035,092.65
  SAO JOSE TR 500/138 kV SAO JOSE TRR1 RJ RBF FT TR 500/138 kV SAO JOSE TRR1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,095,428.39
  SAO JOSE TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,379,374.84
  SAO JOSE TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,379,374.84
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,476,675.82
  SAO JOSE MC 500 kV TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,476,675.82
  SAO JOSE EL 500 kV SAO JOSE LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ RB FT LT 500 kV NOVA IGUACU /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,673,111.75
  SAO JOSE EL 500 kV SAO JOSE LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /SAO JOSE C-1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,673,111.75
  SAO JOSE TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RMEL REA 5457/2015 21/11/2017 20/11/2051 1,974,707.17
  SAO JOSE TR 500/138 kV SAO JOSE TRR1 RJ RBF FT TR 500/138 kV SAO JOSE TRR1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,108,798.51
  SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 2,466,051.67
  SAO JOSE TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,286,285.17
  SAO JOSE TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 3,286,285.17
  SAO JOSE MG 500 kV SAO JOSE MG1 RJ RB FT MG 500 kV SAO JOSE MG1 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 4,747,372.00
  SAO JOSE TR 500/138 kV SAO JOSE TR13 RJ RBF FT TR 500/138 kV SAO JOSE TR13 RJ 062/2001 IPCA RMEL REA 5457/2015 12/12/2016 11/12/2050 5,172,140.02
  SAO JOSE TR 500/138 kV SAO JOSE TR14 RJ RBF FT TR 500/138 kV SAO JOSE TR14 RJ 062/2001 IPCA RMEL REA 5457/2015 21/11/2017 20/11/2051 5,550,218.02
  SAO JOSE TR 500/138 kV SAO JOSE TR12 RJ RBF FT TR 500/138 kV SAO JOSE TR12 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,326,395.53
  SAO JOSE TR 500/138 kV SAO JOSE TR11 RJ RBF FT TR 500/138 kV SAO JOSE TR11 RJ 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 6,326,395.53
  TERMINAL RIO RTB 500 kV 46 Mvar TERMINAL RIO RTR1 RJ RB FT RTB 500 kV 45,33 Mvar TERMINAL RIO RTR1 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2058 98,030.87
  TERMINAL RIO MG 500 kV TERMINAL RIO MG4 RJ RB FT MG 500 kV TERMINAL RIO MG4 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2053 224,774.34
  TERMINAL RIO MC 500 kV RTB 500 kV 136 Mvar TERMINAL RIO RT2 RJ RB FT RTB 500 kV 136 Mvar TERMINAL RIO RT2 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2051 227,709.43
  TERMINAL RIO MC 500 kV RTB 500 kV 136 Mvar TERMINAL RIO RT1 RJ RB FT RTB 500 kV 136 Mvar TERMINAL RIO RT1 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2051 227,709.43
  TERMINAL RIO EL 500 kV TERMINAL RIO LT 500 kV TERMINAL RIO /RESENDE C-1 RJ RB FT LT 500 kV TERMINAL RIO /RESENDE C-1 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2051 254,268.80
  TERMINAL RIO EL 500 kV TERMINAL RIO LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP RB FT LT 500 kV TERMINAL RIO /C. PAULISTA C-1 RJ/SP 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2051 254,268.80
  TERMINAL RIO EL 500 kV TERMINAL RIO LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-2 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2051 254,268.80
  TERMINAL RIO EL 500 kV TERMINAL RIO LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ RB FT LT 500 kV ADRIANOPOLIS /TERMINAL RIO C-1 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2051 254,268.80
  TERMINAL RIO IB 500 kV MG 500 kV TERMINAL RIO MG1 RJ IB9 RB FT MG 500 kV TERMINAL RIO MG1 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2054 278,805.96
  TERMINAL RIO IB 500 kV MG 500 kV TERMINAL RIO MG1 RJ IB8 RB FT MG 500 kV TERMINAL RIO MG1 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2054 278,805.96
  TERMINAL RIO IB 500 kV MG 500 kV TERMINAL RIO MG1 RJ IB7 RB FT MG 500 kV TERMINAL RIO MG1 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2054 278,805.96
  TERMINAL RIO IB 500 kV MG 500 kV TERMINAL RIO MG1 RJ IB6 RB FT MG 500 kV TERMINAL RIO MG1 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2054 278,805.96
  TERMINAL RIO RTB 500 kV 136 Mvar TERMINAL RIO RT2 RJ RB FT RTB 500 kV 136 Mvar TERMINAL RIO RT2 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2058 294,092.61
  TERMINAL RIO RTB 500 kV 136 Mvar TERMINAL RIO RT1 RJ RB FT RTB 500 kV 136 Mvar TERMINAL RIO RT1 RJ 062/2001 IPCA RBNI DSP 1387/2022 1/7/2022 30/06/2058 294,092.61

 

209 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2045 1,020.43
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 21/03/2016 20/03/2029 3,642.84
  TIJUCO PRETO TT 69/0,22 kV TIJUCO PRETO TT3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RMEL REN 443/2011 2/11/2014 1/11/2038 4,953.84
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2039 6,350.38
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 23/02/2015 22/02/2039 6,350.71
  TIJUCO PRETO MC 69 kV RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP 062/2001 IPCA RMEL REN 443/2011 9/9/2014 8/9/2034 6,777.35
  TIJUCO PRETO MC 69 kV RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP 062/2001 IPCA RMEL REN 443/2011 16/10/2014 15/10/2035 6,801.63
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RMEL REN 443/2011 22/03/2015 21/03/2039 6,882.42
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RMEL REN 443/2011 22/03/2015 21/03/2039 6,882.42
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RBNI REA 4347/2013 25/04/2017 24/04/2032 8,875.44
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 8,934.60
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 8,934.60
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 8,934.60
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RMEL REN 443/2011 21/02/2014 20/02/2034 10,236.80
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RMEL REN 443/2011 21/02/2014 20/02/2034 10,236.80
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RMEL REN 443/2011 21/02/2014 20/02/2034 10,236.80
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RMEL REN 443/2011 19/10/2014 18/10/2035 10,478.25
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-2 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 443/2011 11/1/2015 10/1/2036 10,558.12
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-2 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 443/2011 11/1/2015 10/1/2036 10,558.12
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-2 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 443/2011 11/1/2015 10/1/2036 10,558.12
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 8/2/2015 7/2/2036 10,584.32
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 8/2/2015 7/2/2036 10,584.32
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 8/2/2015 7/2/2036 10,584.32
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-1 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2036 10,600.09
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-1 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2036 10,600.09
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-1 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2036 10,600.09
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBNI REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBNI REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBNI REA 5861/2016 9/7/2019 8/7/2034 10,737.58
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBNI REA 5861/2016 7/12/2017 6/12/2037 12,420.08
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 6/3/2015 5/3/2036 15,041.04
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 443/2011 8/3/2015 7/3/2036 15,044.23
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 443/2011 8/3/2015 7/3/2036 15,044.23
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 443/2011 8/3/2015 7/3/2036 15,044.23
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBNI REA 2837/2011 20/01/2013 19/01/2028 18,081.90
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RMEL REN 643/2014 1/2/2015 31/01/2040 19,674.72
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 1/2/2015 31/01/2036 21,976.42
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 1/2/2015 31/01/2036 21,976.42
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 443/2011 1/2/2015 31/01/2036 21,976.42
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB11 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2042 26,389.07
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB11 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 443/2011 22/02/2015 21/02/2042 26,389.07
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 8314/2019 9/7/2019 8/7/2034 27,860.89
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RBNI REA 5484/2015 8/5/2018 7/5/2033 37,780.20
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RBNI REA 5484/2015 8/5/2018 7/5/2033 37,780.20
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP 062/2001 IPCA RBNI REA 5484/2015 8/5/2018 7/5/2033 37,780.20
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP 062/2001 IPCA RBNI REA 5484/2015 8/5/2018 7/5/2033 37,780.20
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RBNI REA 5484/2015 8/5/2018 7/5/2033 37,780.20
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBNI REA 5484/2015 8/5/2018 7/5/2033 37,780.20
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBNI REA 5484/2015 8/5/2018 7/5/2033 37,780.20
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RBNI REA 5484/2015 8/5/2018 7/5/2033 37,780.20
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBNI REA 5484/2015 8/5/2018 7/5/2033 37,780.20
  TIJUCO PRETO RTB 345 kV 66,33 Mvar TIJUCO PRETO RLCCR SP RB FT RTB 345 kV 66,33 Mvar TIJUCO PRETO RLCCR SP 062/2001 IPCA RMEL REN 643/2014 15/02/2013 14/02/2049 38,213.51
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 443/2011 19/01/2014 18/01/2034 43,395.52
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 643/2014 12/4/2015 11/4/2042 44,021.80
  TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREG2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 443/2011 7/12/2014 6/12/2035 44,764.47
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 643/2014 8/3/2015 7/3/2036 45,132.66
  TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREG1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 643/2014 22/03/2015 21/03/2036 45,199.43
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RMEL REN 643/2014 7/9/2015 6/9/2036 45,848.51
  TIJUCO PRETO MC 20 kV CS 330/-220 MVAr TIJUCO PRETO CS1 SP RB FT CS 330/-220 MVAr TIJUCO PRETO CS1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,911.63
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 643/2014 26/04/2015 25/04/2042 47,769.94
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 643/2014 3/5/2015 2/5/2042 47,782.15
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 643/2014 10/5/2015 9/5/2042 47,810.30
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RMEL REN 643/2014 22/03/2015 21/03/2036 48,328.81
  TIJUCO PRETO MC 69 kV RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  TIJUCO PRETO MC 69 kV RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,623.82
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR7 SP RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036 51,152.40
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR7 SP RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036 51,152.40
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RMEL REN 643/2014 7/9/2015 6/9/2030 51,411.05
  TIJUCO PRETO MC 750 kV TR 750/69 kV TIJUCO PRETO RIATP3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 61,004.62
  TIJUCO PRETO MC 750 kV RTL 750 kV 329 Mvar TIJUCO PRETO RIATP2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 61,004.62
  TIJUCO PRETO MC 750 kV RTL 750 kV 329 Mvar TIJUCO PRETO RIATP1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 61,004.62
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RMEL REN 643/2014 5/4/2015 4/4/2042 63,761.95
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RMEL REN 443/2011 25/05/2014 24/05/2034 64,409.69
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR6 SP RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RMEL REN 443/2011 1/6/2014 31/05/2034 64,460.61
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RMEL REN 443/2011 19/10/2014 18/10/2035 65,317.20
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR7 SP RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RMEL REN 443/2011 21/10/2014 20/10/2035 65,331.45
  TIJUCO PRETO TT 69/0,22 kV TIJUCO PRETO TT3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  TIJUCO PRETO TT 69/0,22 kV TIJUCO PRETO TT2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  TIJUCO PRETO TT 69/0,22 kV TIJUCO PRETO TT1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  TIJUCO PRETO TT 20/0,22 kV TIJUCO PRETO TT4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP 062/2001 IPCA RBNI REA 5484/2015 8/5/2018 7/5/2033 95,190.97
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBNI REA 5484/2015 8/5/2018 7/5/2033 95,190.97
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP MC2 RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RBNI REA 5484/2015 8/5/2018 7/5/2033 95,190.97
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP MC1 RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RBNI REA 5484/2015 8/5/2018 7/5/2033 95,190.97
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR6 SP RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036 106,175.04
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR6 SP RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036 106,175.04

 

210 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,714.88
  TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 170,714.88
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 2010/2009 1/10/2013 30/09/2047 173,159.58
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP 007/2006 IPCA RMEL REN 443/2011 30/04/2014 29/04/2047 181,586.67
  TIJUCO PRETO RTB 345 kV 0 Mvar TIJUCO PRETO RLCCB SP RB FT RTB 345 kV 0 Mvar TIJUCO PRETO RLCCB SP 062/2001 IPCA RBNI REA 1410/2008 28/12/2012 27/12/2042 184,260.45
  TIJUCO PRETO RTB 345 kV 0 Mvar TIJUCO PRETO RLCCA SP RB FT RTB 345 kV 0 Mvar TIJUCO PRETO RLCCA SP 062/2001 IPCA RBNI REA 1410/2008 28/12/2012 27/12/2042 184,260.51
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,483.99
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,483.99
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,483.99
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,483.99
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,483.99
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,483.99
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,483.99
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,483.99
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP MC1 RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 193,483.99
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB9 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB8 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB7 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB6 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB5 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB4 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB13 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB12 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB11 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB10 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB1 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR6 SP RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP MC2 RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 209,948.33
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB12 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 21/05/2014 20/05/2043 212,765.46
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB6 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 2/8/2014 1/8/2043 213,880.19
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB7 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 8/9/2014 7/9/2043 214,464.93
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB4 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 14/12/2014 13/12/2044 215,961.53
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-2 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 643/2014 9/8/2014 8/8/2043 219,245.66
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-2 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 643/2014 17/08/2014 16/08/2043 219,386.66
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 643/2014 24/08/2014 23/08/2043 219,510.05
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-1 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 643/2014 31/08/2014 30/08/2043 219,633.43
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RMEL REN 643/2014 23/11/2014 22/11/2043 220,944.38
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RMEL REN 643/2014 26/02/2014 25/02/2043 222,494.64
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RMEL REN 643/2014 13/03/2014 12/3/2043 222,723.75
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RMEL REN 643/2014 18/04/2014 17/04/2043 223,336.02
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RMEL REN 643/2014 3/5/2014 2/5/2043 223,561.48
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB11 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 15/05/2014 14/05/2043 226,482.13
  TIJUCO PRETO MC 345 kV RTB 345 kV 0 Mvar TIJUCO PRETO RLCCB SP RB FT RTB 345 kV 0 Mvar TIJUCO PRETO RLCCB SP 062/2001 IPCA RBNI REA 1410/2008 28/12/2012 27/12/2037 226,516.05
  TIJUCO PRETO MC 345 kV RTB 345 kV 0 Mvar TIJUCO PRETO RLCCA SP RB FT RTB 345 kV 0 Mvar TIJUCO PRETO RLCCA SP 062/2001 IPCA RBNI REA 1410/2008 28/12/2012 27/12/2037 226,516.05
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB5 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 25/05/2014 24/05/2043 226,666.89
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC1 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RMEL REN 643/2014 6/12/2014 5/12/2044 227,109.61
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB10 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 27/07/2014 26/07/2043 227,723.35
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB1 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 9/3/2014 8/3/2043 227,777.76
  TIJUCO PRETO IB 345 kV MG 750 kV TIJUCO PRETO MG1 SP IB9 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 12/11/2014 11/11/2043 229,474.03
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR6 SP RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RMEL REA 11449/2022 22/04/2022 22/04/2057 234,692.76
  TIJUCO PRETO MC 345 kV BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP MC1 RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RMEL REN 643/2014 5/4/2014 4/4/2043 235,003.51
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP 062/2001 IPCA RMEL REN 643/2014 1/2/2014 31/01/2043 239,542.82
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP 062/2001 IPCA RMEL REN 643/2014 27/02/2014 26/02/2043 239,716.92
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP MC2 RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RMEL REN 643/2014 27/02/2014 26/02/2043 239,716.92
  TIJUCO PRETO MC 345 kV BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP 062/2001 IPCA RMEL REN 643/2014 23/03/2014 22/03/2043 239,778.10
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-3 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-2 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-1 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-2 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP RB FT LT 345 kV IBIUNA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-2 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC9 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,100.27
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC8 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,100.27
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC7 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,100.27
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC6 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,100.27
  TIJUCO PRETO BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,100.27
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,100.27
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,100.27
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,100.27
  TIJUCO PRETO BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC10 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 248,100.27
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RMEL REN 643/2014 30/11/2014 29/11/2043 249,195.39
  TIJUCO PRETO IB 500 kV MG 750 kV TIJUCO PRETO MG1 SP IB1 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 28/09/2014 27/09/2043 261,629.79
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBNI REA 5484/2015 21/12/2021 20/12/2036 264,821.43
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RMEL REN 643/2014 28/05/2015 27/05/2045 277,561.34
  TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB3 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RMEL REN 643/2014 15/01/2015 14/01/2045 287,226.40
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 643/2014 16/09/2014 15/09/2043 287,817.03
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RMEL REN 643/2014 19/10/2014 18/10/2043 305,289.79
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036 314,496.74

 

211 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036 314,496.74
  TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB5 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 2010/2009 1/10/2013 30/09/2041 315,380.95
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036 323,227.67
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBNI REA 5484/2015 21/05/2021 20/05/2036 323,227.67
  TIJUCO PRETO IB 500 kV MG 750 kV TIJUCO PRETO MG1 SP IB3 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  TIJUCO PRETO IB 500 kV MG 750 kV TIJUCO PRETO MG1 SP IB2 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  TIJUCO PRETO IB 500 kV MG 750 kV TIJUCO PRETO MG1 SP IB1 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 341,675.63
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP RB FT LT 500 kV TIJUCO PRETO /TAUBATE C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 364,796.71
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBNI REA 5484/2015 21/12/2021 20/12/2036 376,332.88
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBNI REA 5484/2015 21/12/2021 20/12/2036 376,332.88
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBNI REA 5484/2015 21/12/2021 20/12/2036 385,953.59
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBNI REA 5484/2015 21/12/2021 20/12/2036 388,212.83
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBNI REA 5484/2015 21/12/2021 20/12/2036 388,212.83
  TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 406,718.87
  TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 406,718.87
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 483,744.89
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 506,862.26
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 506,862.26
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 506,862.26
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR6 SP RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 506,862.26
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 506,862.26
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 506,862.26
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 575,499.78
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV LESTE /TIJUCO PRETO C-3 SP RB FT LT 345 kV LESTE /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 576,269.91
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-2 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 576,269.91
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 576,269.91
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 576,269.91
  TIJUCO PRETO BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 591,085.32
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 591,085.32
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 591,085.32
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 591,085.32
  TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB4 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB3 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB2 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  TIJUCO PRETO IB 750 kV MG 750 kV TIJUCO PRETO MG1 SP IB1 RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 609,146.98
  TIJUCO PRETO MC 345 kV TR 750/345 kV TIJUCO PRETO TR7 SP RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RBNI REA 2010/2009 28/11/2014 27/11/2042 633,369.19
  TIJUCO PRETO IB 345 kV MG 345 kV TIJUCO PRETO MG2 SP IB3 RB FT MG 345 kV TIJUCO PRETO MG2 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 644,816.10
  TIJUCO PRETO IB 345 kV MG 345 kV TIJUCO PRETO MG2 SP IB2 RB FT MG 345 kV TIJUCO PRETO MG2 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 644,816.10
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 1410/2008 4/11/2015 3/11/2043 650,945.90
  TIJUCO PRETO TR 750/69 kV TIJUCO PRETO RIATP3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RMEL REA 11449/2022 4/5/2022 4/5/2058 683,604.66
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TRR2 SP RB FT TR 750/345 kV TIJUCO PRETO TRR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 717,694.11
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 782,970.53
  TIJUCO PRETO RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP RB FT RTB 69 kV 180 MVAr TIJUCO PRETO RT1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 782,970.53
  TIJUCO PRETO TR 750/69 kV TIJUCO PRETO RIATP3 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 809,093.83
  TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 809,093.83
  TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 809,093.83
  TIJUCO PRETO EL 500 kV TIJUCO PRETO LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP RB FT LT 500 kV C. PAULISTA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 869,108.22
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR7 SP RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RBNI REA 2010/2009 28/11/2014 27/11/2043 1,059,733.21
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP RB FT LT 345 kV B. SANTISTA /TIJUCO PRETO C-3 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,109,371.58
  TIJUCO PRETO BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP RB FT BC 345 kV 200 Mvar TIJUCO PRETO BC5 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,137,892.59
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC4 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,137,892.59
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC3 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,137,892.59
  TIJUCO PRETO BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP RB FT BC 345 kV 200 MVAr TIJUCO PRETO BC2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,137,892.59
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,207,571.62
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,207,571.62
  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,207,571.62
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,371,096.78
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,476,675.82
  TIJUCO PRETO MC 500 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,476,675.82
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TRR2 SP RB FT TR 750/345 kV TIJUCO PRETO TRR2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,709,867.00
  TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREG3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,726,455.52
  TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREG2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,726,455.52
  TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREG1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 1,726,455.52
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-4 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 1,887,189.56
  TIJUCO PRETO EL 345 kV TIJUCO PRETO LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP RB FT LT 345 kV ITAPETI /TIJUCO PRETO C-3 SP 007/2006 IPCA RBL CC 007/2006 27/04/2006 27/04/2036 1,887,189.56
  TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,927,621.82
  TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,927,621.82
  TIJUCO PRETO CS 330/-220 MVAr TIJUCO PRETO CS1 SP RB FT CS 330/-220 MVAr TIJUCO PRETO CS1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,102,476.72
  TIJUCO PRETO TR 765/345 kV TIJUCO PRETO TRR3 SP RB FT TR 750/345 kV TIJUCO PRETO TRR3 SP 062/2001 IPCA RBNI REA 3698/2012 21/03/2016 20/03/2049 2,133,119.53
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR6 SP RB FT TR 750/345 kV TIJUCO PRETO TR6 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,153,082.34
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,153,082.34
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,153,082.34
  TIJUCO PRETO RTL 750 kV 360 Mvar TIJUCO PRETO RIATPR SP RB FT RTL 750 kV 360 Mvar TIJUCO PRETO RIATPR SP 062/2001 IPCA RMEL REN 643/2014 19/12/2013 18/12/2045 2,261,941.46
  TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR3 SP RB FT TR 750/500 kV TIJUCO PRETO TR3 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,305,288.23
  TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,305,288.23
  TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,305,288.23
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,324,684.35
  TIJUCO PRETO MC 750 kV TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,324,684.35

 

212 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  TIJUCO PRETO MC 750 kV TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,324,684.35
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBNI REA 1410/2008 4/11/2015 3/11/2044 2,634,607.27
  TIJUCO PRETO EL 750 kV TIJUCO PRETO LT 750 kV ITABERA /TIJUCO PRETO C-1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,639,485.04
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 2,677,591.96
  TIJUCO PRETO TR 500/69 kV TIJUCO PRETO TREGR1 SP RB FT TR 750/500 kV TIJUCO PRETO TRR1 SP 062/2001 IPCA RMEL REA 11449/2022 4/5/2022 4/5/2057 2,916,015.69
  TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP2 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,710,845.97
  TIJUCO PRETO RTL 750 kV 329 Mvar TIJUCO PRETO RIATP1 SP RB FT LT 750 kV ITABERA /TIJUCO PRETO C-1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,710,845.97
  TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TRR1 SP RB FT TR 750/500 kV TIJUCO PRETO TRR1 SP 062/2001 IPCA RMEL REA 11449/2022 4/5/2022 4/5/2057 4,507,664.65
  TIJUCO PRETO CS 330/-220 MVAr TIJUCO PRETO CS1 SP RB FT CS 330/-220 MVAr TIJUCO PRETO CS1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,009,035.89
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,129,601.00
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,129,601.00
  TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,492,223.21
  TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR1 SP RB FT TR 750/500 kV TIJUCO PRETO TR1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 5,492,223.21
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR7 SP RB FT TR 750/345 kV TIJUCO PRETO TR7 SP 062/2001 IPCA RBNI REA 2010/2009 28/11/2014 27/11/2045 6,132,734.90
  TIJUCO PRETO MG 750 kV TIJUCO PRETO MG1 SP RB FT MG 750 kV TIJUCO PRETO MG1 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 6,379,216.50
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RMEL REA 11449/2022 22/04/2022 22/04/2057 6,813,497.23
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR4 SP RB FT TR 750/345 kV TIJUCO PRETO TR4 SP 062/2001 IPCA RMEL REA 11449/2022 22/04/2022 22/04/2057 7,046,657.67
  TIJUCO PRETO TR 750/345 kV TIJUCO PRETO TR5 SP RB FT TR 750/345 kV TIJUCO PRETO TR5 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 9,874,944.84
  TIJUCO PRETO TR 750/500 kV TIJUCO PRETO TR2 SP RB FT TR 750/500 kV TIJUCO PRETO TR2 SP 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 10,573,025.33
  U.MASCARENHAS EL 230 kV U.MASCARENHAS LT 230 kV U.MASCARENHAS /LINHARES C-1 ES RB FT LT 230 kV U.MASCARENHAS /LINHARES C-1 ES 006/2010 IPCA RBL CC 006/2010 14/08/2018 12/7/2040 571,005.76
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG3 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG2 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG1 GO DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 321,966.83
  UHE S.DA MESA MG 500 kV UHE S.DA MESA MG1 GO RB FT MG 500 kV UHE S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 626,667.27
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG3 GO DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG2 GO DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG1 GO DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 767,068.36
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG3 GO DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,476,675.82
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG2 GO DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,476,675.82
  UHE S.DA MESA MC 500 kV TR 15/500 kV UHE S.DA MESA TRG1 GO DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 1,476,675.82
  UHE S.DA MESA MG 500 kV UHE S.DA MESA MG1 GO RB FT MG 500 kV UHE S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,493,000.51
  UHE S.DA MESA MG 500 kV UHE S.DA MESA MG1 GO RB FT MG 500 kV UHE S.DA MESA MG1 GO 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 2,874,160.72
  USI CAMPOS IB 69 kV MG 138 kV USI CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RCDM REA 1814/2009 10/9/2015 9/9/2042 11,037.11
  USI CAMPOS IB 69 kV MG 138 kV USI CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RCDM REA 1814/2009 10/9/2015 9/9/2042 11,037.11
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 10/9/2015 9/9/2042 12,068.88
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 10/9/2015 9/9/2042 12,068.88
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 10/9/2015 9/9/2045 23,690.28
  USI CAMPOS EL 138 kV USI CAMPOS  DIST3 DIT   062/2001 IPCA RMEL REN 643/2014 28/02/2016 27/02/2044 25,661.05
  USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 23/09/2016 22/09/2044 26,013.34
  USI CAMPOS IB 69 kV MG 138 kV USI CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 32,730.44
  USI CAMPOS EL 138 kV USI CAMPOS  DIST3 DIT   062/2001 IPCA RMEL REN 643/2014 12/10/2016 11/10/2045 37,740.54
  USI CAMPOS EL 138 kV USI CAMPOS  DIST4 DIT   062/2001 IPCA RCDM REA 2376/2010 26/05/2014 25/05/2040 43,607.83
  USI CAMPOS EL 138 kV USI CAMPOS  DIST3 DIT   062/2001 IPCA RCDM REA 2376/2010 1/6/2014 31/05/2040 43,631.30
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR2 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 26/07/2014 25/07/2040 46,820.41
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,797.64
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,797.64
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 51,797.64
  USI CAMPOS IB 138 kV MG 138 kV USI CAMPOS MG1 RJ IB2 DIT   062/2001 IPCA RMEL REN 643/2014 26/02/2015 25/02/2042 52,218.38
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 20/07/2015 19/07/2042 52,314.72
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 23/08/2015 22/08/2042 52,444.07
  USI CAMPOS EL 69 kV USI CAMPOS  DIST4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,931.23
  USI CAMPOS EL 69 kV USI CAMPOS  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,931.23
  USI CAMPOS EL 69 kV USI CAMPOS  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,931.23
  USI CAMPOS EL 69 kV USI CAMPOS  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 56,931.23
  USI CAMPOS EL 138 kV USI CAMPOS  DIST4 DIT   062/2001 IPCA RMEL REN 643/2014 31/01/2016 30/01/2044 62,733.44
  USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RMEL REN 643/2014 25/09/2016 24/09/2044 63,723.73
  USI CAMPOS IB 138 kV MG 138 kV USI CAMPOS MG1 RJ IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  USI CAMPOS TR 138/69 kV USI CAMPOS TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 82,575.09
  USI CAMPOS TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 82,575.09
  USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RMEL REN 643/2014 19/06/2016 18/06/2044 89,164.35
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR3 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,553.96
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,553.96
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,553.96
  USI CAMPOS IB 69 kV MG 138 kV USI CAMPOS MG1 RJ IB1 DIT   062/2001 IPCA RCDM REA 1814/2009 11/6/2016 10/6/2047 109,307.56
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RCDM REN 443/2011 11/12/2015 10/12/2046 110,245.17
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR2 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 26/07/2014 25/07/2043 112,873.15
  USI CAMPOS MC 69 kV TR 138/69 kV USI CAMPOS TR1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 19/10/2014 18/10/2044 113,560.29
  USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RCDM REA 1814/2009 19/06/2016 18/06/2047 114,909.05
  USI CAMPOS EL 69 kV USI CAMPOS  DIST1 DIT   062/2001 IPCA RCDM REA 1814/2009 10/3/2013 9/3/2040 116,910.56
  USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-2 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,344.54
  USI CAMPOS EL 138 kV USI CAMPOS LT 138 kV USI CAMPOS /CAMPOS C-1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,344.54
  USI CAMPOS EL 138 kV USI CAMPOS  DIST4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,344.54
  USI CAMPOS EL 138 kV USI CAMPOS  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,344.54
  USI CAMPOS EL 138 kV USI CAMPOS  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,344.54
  USI CAMPOS EL 138 kV USI CAMPOS  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 130,344.54
  USI CAMPOS IB 138 kV MG 138 kV USI CAMPOS MG1 RJ IB2 DIT   062/2001 IPCA RCDM REA 1814/2009 15/04/2016 14/04/2047 140,229.57
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 30/06/2028 215,739.86
  USI CAMPOS MG 138 kV USI CAMPOS MG1 RJ DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 324,943.87
  USI CAMPOS MC 138 kV TR 138/69 kV USI CAMPOS TR3 RJ DIT   062/2001 IPCA RPC PRT 120/2016 1/7/2017 31/12/2042 415,318.69
  VENDA PEDRAS EL 345 kV VENDA PEDRAS LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ RB FT LT 345 kV MACAE MERCHAN /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBNI REA 5538/2015 1/7/2016 31/12/2042 915,910.17
  VENDA PEDRAS EL 345 kV VENDA PEDRAS LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ RB FT LT 345 kV ADRIANOPOLIS /VENDA PEDRAS C-1 RJ 062/2001 IPCA RBNI REA 5538/2015 1/7/2016 31/12/2042 915,910.17
  VIANA MG 345 kV VIANA MG1 ES RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 5,722.12
  VIANA MC 345 kV RTL 345 kV 60 Mvar VIANA RT1 ES RB FT RTL 345 kV 60 Mvar VIANA RT1 ES 062/2001 IPCA RMEL REN 443/2011 21/11/2014 20/11/2041 42,325.64
  VIANA MG 345 kV VIANA MG1 ES RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2050 44,729.00
  VIANA IB 138 kV MG 345 kV VIANA MG1 ES IB2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 75,437.55
  VIANA MC 138 kV TR 345/138 kV VIANA TR3 ES RBF FT TR 345/138 kV VIANA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,553.96

 

213 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  VIANA MC 138 kV TR 345/138 kV VIANA TR2 ES RBF FT TR 345/138 kV VIANA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,553.96
  VIANA MC 138 kV TR 345/138 kV VIANA TR1 ES RBF FT TR 345/138 kV VIANA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 90,553.96
  VIANA MC 345 kV RTL 345 kV 60 Mvar VIANA RT1 ES RB FT RTL 345 kV 60 Mvar VIANA RT1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,880.21
  VIANA EL 138 kV VIANA  DIST6 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 133,881.23
  VIANA EL 138 kV VIANA  DIST5 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 133,881.23
  VIANA EL 138 kV VIANA  DIST4 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 133,881.23
  VIANA EL 138 kV VIANA  DIST3 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 133,881.23
  VIANA EL 138 kV VIANA  DIST2 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 133,881.23
  VIANA EL 138 kV VIANA  DIST1 DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 133,881.23
  VIANA RTL 345 kV 60 Mvar VIANA RT1 ES RB FT RTL 345 kV 60 Mvar VIANA RT1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 191,232.86
  VIANA IB 345 kV MG 345 kV VIANA MG1 ES IB3 RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  VIANA IB 345 kV MG 345 kV VIANA MG1 ES IB2 RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  VIANA IB 345 kV MG 345 kV VIANA MG1 ES IB1 RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  VIANA MC 345 kV TR 345/138 kV VIANA TR3 ES RBF FT TR 345/138 kV VIANA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  VIANA MC 345 kV TR 345/138 kV VIANA TR2 ES RBF FT TR 345/138 kV VIANA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  VIANA MC 345 kV TR 345/138 kV VIANA TR1 ES RBF FT TR 345/138 kV VIANA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 203,045.54
  VIANA TR 345/138 kV VIANA TRR1 ES RBF FT TR 345/138 kV VIANA TRR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 236,778.62
  VIANA EL 345 kV VIANA LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  VIANA EL 345 kV VIANA LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VIANA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  VIANA MC 345 kV RTL 345 kV 60 Mvar VIANA RT1 ES RB FT RTL 345 kV 60 Mvar VIANA RT1 ES 062/2001 IPCA RMEL REN 443/2011 21/11/2014 20/11/2044 277,450.34
  VIANA MG 345 kV VIANA MG1 ES RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2038 411,024.00
  VIANA RTL 345 kV 60 Mvar VIANA RT1 ES RB FT RTL 345 kV 60 Mvar VIANA RT1 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 455,601.85
  VIANA MC 138 kV TR 345/138 kV VIANA TR4 ES RBF FT TR 345/138 kV VIANA TR4 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2042 619,383.55
  VIANA TR 345/138 kV VIANA TR3 ES RBF FT TR 345/138 kV VIANA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,335.86
  VIANA TR 345/138 kV VIANA TR2 ES RBF FT TR 345/138 kV VIANA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,335.86
  VIANA TR 345/138 kV VIANA TR1 ES RBF FT TR 345/138 kV VIANA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,335.86
  VIANA MG 345 kV VIANA MG1 ES RB FT MG 345 kV VIANA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 846,467.95
  VIANA MC 345 kV TR 345/138 kV VIANA TR4 ES RBF FT TR 345/138 kV VIANA TR4 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2046 1,233,446.09
  VIANA TR 345/138 kV VIANA TRR4 ES RBF FT TR 345/138 kV VIANA TRR4 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2054 1,497,241.64
  VIANA TR 345/138 kV VIANA TR4 ES RBF FT TR 345/138 kV VIANA TR4 ES 062/2001 IPCA RBNI REA 5148/2015 29/08/2019 29/08/2054 4,491,724.92
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-3 ES DIT   062/2001 IPCA RMEL REN 443/2011 18/05/2017 17/05/2040 4,740.71
  VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 10,437.97
  VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBNI REA 4347/2013 31/10/2017 30/10/2045 10,576.12
  VITORIA TR 345/138 kV VITORIA TRR1 ES RBF FT TR 345/138 kV VITORIA TRR1 ES 062/2001 IPCA RMEL REN 443/2011 10/11/2016 9/11/2039 11,146.06
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RMEL REN 443/2011 18/05/2017 17/05/2040 11,297.19
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RMEL REN 443/2011 23/07/2017 22/07/2040 11,349.20
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RMEL REN 443/2011 23/07/2017 22/07/2040 11,349.20
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 443/2011 6/8/2017 5/8/2040 11,355.78
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 443/2011 6/8/2017 5/8/2040 11,355.78
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 443/2011 6/8/2017 5/8/2040 11,355.78
  VITORIA MC 13,8 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 17,542.77
  VITORIA MC 13,8 kV TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 17,542.77
  VITORIA MC 13,8 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 17,542.77
  VITORIA EL 345 kV VITORIA LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RBNI REA 2040/2009 6/4/2015 5/4/2036 29,180.08
  VITORIA EL 345 kV VITORIA LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RBNI REA 2040/2009 6/4/2015 5/4/2036 29,180.08
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-2 ES DIT   062/2001 IPCA RMEL REN 643/2014 14/03/2016 13/03/2044 31,637.33
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-1 ES DIT   062/2001 IPCA RMEL REN 643/2014 3/4/2016 2/4/2044 31,675.69
  VITORIA MC 345 kV RTB 345 kV 60 Mvar VITORIA RT2 ES RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RMEL REN 643/2014 17/05/2015 16/05/2042 34,395.24
  VITORIA MC 13,8 kV TR 345/138 kV VITORIA TR4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 34,694.77
  VITORIA MC 13,8 kV TR 345/13,8 kV VITORIA TRSC01 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 34,694.77
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 643/2014 6/11/2014 5/11/2041 36,111.32
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 643/2014 10/11/2014 9/11/2041 36,123.85
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 643/2014 19/11/2014 18/11/2041 36,152.09
  VITORIA MC 345 kV TR 345/13,8 kV VITORIA TRSC01 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RMEL REN 643/2014 12/9/2015 11/9/2042 36,948.22
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 643/2014 10/1/2016 9/1/2044 37,257.12
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC9 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC9 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC8 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC8 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC7 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC7 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC6 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC6 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC5 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC5 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC4 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC4 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC3 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC2 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC12 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC12 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC11 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC11 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC10 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC10 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC1 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 43,449.89
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-1 ES DIT   062/2001 IPCA RMEL REN 643/2014 5/6/2016 4/6/2044 43,896.88
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-2 ES DIT   062/2001 IPCA RMEL REN 643/2014 19/06/2016 18/06/2044 43,945.29
  VITORIA MC 13,8 kV CS 60/-30 MVAr VITORIA CS1 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 46,911.63
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC9 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC9 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,653.77
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC8 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC8 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,653.77
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC7 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC7 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,653.77
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC6 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC6 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,653.77
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC5 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC5 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,653.77
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC4 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC4 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,653.77
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC3 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,653.77
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC2 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,653.77
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC12 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC12 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,653.77
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC11 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC11 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,653.77
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC10 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC10 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 48,653.77
  VITORIA EL 345 kV VITORIA LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RMEL REN 643/2014 18/05/2015 17/05/2042 50,865.20
  VITORIA EL 345 kV VITORIA LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RMEL REN 643/2014 15/06/2016 14/06/2044 52,271.20
  VITORIA MC 13,8 kV BC 13,8 kV 10 MVAr VITORIA BC1 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 56,110.58
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-3 ES DIT   062/2001 IPCA RCDM REA 1814/2009 3/6/2012 2/6/2036 61,470.51
  VITORIA TT 13,8/0 kV VITORIA TRT4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71

 

214 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

  VITORIA TT 13,8/0 kV VITORIA TRT3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  VITORIA TT 13,8/0 kV VITORIA TRT2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  VITORIA TT 13,8/0 kV VITORIA TRT1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 68,708.71
  VITORIA EL 345 kV VITORIA LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RMEL REN 643/2014 23/07/2015 22/07/2042 70,533.93
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RMEL REN 643/2014 3/7/2015 2/7/2042 73,514.61
  VITORIA MC 138 kV TR 345/138 kV VITORIA TR4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 79,943.87
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-3 ES DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,482.83
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-2 ES DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,482.83
  VITORIA EL 138 kV VITORIA LT 138 kV VITORIA /PITANGA C-1 ES DIT   062/2001 IPCA RPC PRT 579/2012 1/1/2013 1/1/2043 90,482.83
  VITORIA TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBNI REA 5484/2015 8/11/2015 7/11/2041 99,142.67
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC9 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC9 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,516.99
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC8 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC8 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,516.99
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC7 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC7 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,516.99
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC3 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC3 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,516.99
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC2 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC2 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,516.99
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC1 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC1 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 103,516.99
  VITORIA TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBNI REA 5484/2015 20/12/2015 19/12/2041 116,039.49
  VITORIA TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBNI REA 5484/2015 10/1/2016 9/1/2042 116,200.19
  VITORIA TR 345/138 kV VITORIA TR4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBNI REA 5484/2015 12/10/2015 11/10/2041 122,685.01
  VITORIA MC 345 kV RTL 345 kV 60 Mvar VITORIA RT3 ES RB FT RTL 345 kV 60 Mvar VITORIA RT3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 124,880.21
  VITORIA MC 345 kV RTB 345 kV 60 Mvar VITORIA RT2 ES RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 168,230.72
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,014.90
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,014.90
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,014.90
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,014.90
  VITORIA MC 345 kV TR 345/13,8 kV VITORIA TRSC01 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 195,014.90
  VITORIA IB 345 kV MG 345 kV VITORIA MG1 ES IB2 RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  VITORIA IB 345 kV MG 345 kV VITORIA MG1 ES IB1 RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 197,021.45
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC9 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC9 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 199,279.54
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC8 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC8 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 199,279.54
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC7 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC7 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 199,279.54
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC3 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC3 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 199,279.54
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC2 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC2 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 199,279.54
  VITORIA BC 13,8 kV 10 MVAr VITORIA BC1 ES RBF FT BC 13,8 kV 10 MVAr VITORIA BC1 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 199,279.54
  VITORIA EL 345 kV VITORIA LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RMEL REN 643/2014 23/07/2015 22/07/2045 217,246.44
  VITORIA MC 345 kV RTB 345 kV 60 Mvar VITORIA RT2 ES RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RMEL REN 643/2014 23/12/2014 22/12/2044 231,633.85
  VITORIA TR 345/138 kV VITORIA TRR1 ES RBF FT TR 345/138 kV VITORIA TRR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 236,778.62
  VITORIA EL 345 kV VITORIA LT 345 kV VITORIA /PADRE FIALHO C-1 ES/MG RB FT LT 345 kV VITORIA /PADRE FIALHO C-1 ES/MG 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  VITORIA EL 345 kV VITORIA LT 345 kV VIANA /VITORIA C-1 ES RB FT LT 345 kV VIANA /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  VITORIA EL 345 kV VITORIA LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 241,881.69
  VITORIA TR 345/13,8 kV VITORIA TRSC01 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 250,120.03
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RMEL REN 643/2014 30/09/2014 29/09/2043 254,895.39
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RMEL REN 643/2014 3/7/2015 2/7/2045 259,750.00
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RMEL REN 643/2014 26/09/2014 25/09/2043 262,613.65
  VITORIA RTL 345 kV 60 Mvar VITORIA RT3 ES RB FT RTL 345 kV 60 Mvar VITORIA RT3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,109.29
  VITORIA RTB 345 kV 60 Mvar VITORIA RT2 ES RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 385,109.29
  VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2051 464,529.28
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 464,612.34
  VITORIA TR 345/138 kV VITORIA TRR1 ES RBF FT TR 345/138 kV VITORIA TRR1 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 564,112.12
  VITORIA EL 345 kV VITORIA LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES RB FT LT 345 kV RIO NOVO DO SUL /VITORIA C-1 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 576,269.91
  VITORIA TR 345/13,8 kV VITORIA TRSC01 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 595,897.31
  VITORIA TR 345/138 kV VITORIA TR4 ES RBF FT TR 345/138 kV VITORIA TR4 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,335.86
  VITORIA TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,335.86
  VITORIA TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,335.86
  VITORIA TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 710,335.86
  VITORIA CS 60/-30 MVAr VITORIA CS1 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 761,152.63
  VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBSE PRT 579/2012 1/1/2013 1/1/2043 810,858.15
  VITORIA MC 138 kV TR 345/138 kV VITORIA TR5 ES RBF FT TR 345/138 kV VITORIA TR5 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2043 874,292.13
  VITORIA RTB 345 kV 60 Mvar VITORIA RT2 ES RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 917,501.83
  VITORIA TR 345/13,8 kV VITORIA TRSC01 ES RB FT CS 60/-30 MVAr VITORIA CS1 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,147,156.10
  VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2048 1,257,417.89
  VITORIA MC 345 kV TR 345/138 kV VITORIA TR5 ES RBF FT TR 345/138 kV VITORIA TR5 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2046 1,385,155.96
  VITORIA TR 345/138 kV VITORIA TRR2 ES RBF FT TR 345/138 kV VITORIA TRR2 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2055 1,477,115.93
  VITORIA TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,692,336.36
  VITORIA TR 345/138 kV VITORIA TR2 ES RBF FT TR 345/138 kV VITORIA TR2 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,692,336.36
  VITORIA TR 345/138 kV VITORIA TR1 ES RBF FT TR 345/138 kV VITORIA TR1 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,692,336.36
  VITORIA RTB 345 kV 60 Mvar VITORIA RT2 ES RB FT RTB 345 kV 60 Mvar VITORIA RT2 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 1,766,273.82
  VITORIA MG 345 kV VITORIA MG1 ES RB FT MG 345 kV VITORIA MG1 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 30/06/2028 1,931,825.22
  VITORIA TR 345/138 kV VITORIA TR3 ES RBF FT TR 345/138 kV VITORIA TR3 ES 062/2001 IPCA RBSE PRT 120/2016 1/7/2017 31/12/2042 3,257,900.22
  VITORIA TR 345/138 kV VITORIA TR5 ES RBF FT TR 345/138 kV VITORIA TR5 ES 062/2001 IPCA RBNI REA 6189/2017 28/08/2020 28/08/2055 4,431,347.84
  XAVANTES EL 230 kV XAVANTES LT 230 kV PIRINEUS /XAVANTES C-2 GO RB FT LT 230 kV PIRINEUS /XAVANTES C-2 GO 014/2011 IPCA RBL CC 014/2011 8/6/2018 9/12/2041 671,241.80
  ZONA OESTE MG 500 kV ZONA OESTE MG2 RJ RB FT MG 500 kV ZONA OESTE MG2 RJ 016/2012 IPCA RMEL REN 443/2011 31/12/2017 30/12/2032 3,825.79
  ZONA OESTE IB 138 kV MG 500 kV ZONA OESTE MG2 RJ IB1 DIT   016/2012 IPCA RPEC CC 016/2012 24/03/2016 10/5/2042 278,404.65
  ZONA OESTE MC 138 kV TR 500/138 kV ZONA OESTE TR1 RJ RBF FT TR 500/138 kV ZONA OESTE TR1 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 10/5/2042 331,968.71
  ZONA OESTE MG 138 kV ZONA OESTE MG1 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2045 336,421.65
  ZONA OESTE EL 138 kV ZONA OESTE LT 138 kV ZONA OESTE /JACAREPAGUA C-2 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2046 1,020,524.74
  ZONA OESTE EL 138 kV ZONA OESTE LT 138 kV ZONA OESTE /JACAREPAGUA C-1 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2046 1,020,524.74
  ZONA OESTE EL 138 kV ZONA OESTE LT 138 kV SANTA CRUZ /ZONA OESTE C-2 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2045 1,049,936.04
  ZONA OESTE EL 138 kV ZONA OESTE LT 138 kV SANTA CRUZ /ZONA OESTE C-1 RJ DIT   062/2001 IPCA RCDM REA 3698/2012 19/06/2016 18/06/2045 1,049,936.04
  ZONA OESTE MC 500 kV TR 500/138 kV ZONA OESTE TR1 RJ RBF FT TR 500/138 kV ZONA OESTE TR1 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 10/5/2042 1,176,545.21
  ZONA OESTE IB 500 kV MG 500 kV ZONA OESTE MG2 RJ IB3 RB FT MG 500 kV ZONA OESTE MG2 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 10/5/2042 1,257,050.10
  ZONA OESTE TR 500/138 kV ZONA OESTE TRR1 RJ RBF FT TR 500/138 kV ZONA OESTE TRR1 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 10/5/2042 1,869,196.41
  ZONA OESTE MG 500 kV ZONA OESTE MG2 RJ RB FT MG 500 kV ZONA OESTE MG2 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 10/5/2042 2,019,996.56
  ZONA OESTE TR 500/138 kV ZONA OESTE TR1 RJ RBF FT TR 500/138 kV ZONA OESTE TR1 RJ 016/2012 IPCA RBL CC 016/2012 24/03/2016 10/5/2042 5,607,587.08
                      13,782,276,492

 

215 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

V. Employees - Effective staff
       
V.1 Employees by capacity      
Eletrobras Company Administrative Operational Total
CGT Eletrosul                                               395                                               876                                              1,271
Chesf                                               688                                             1,898                                            2,586
Eletrobras                                               654                                                  -                                                  654
Eletronorte                                                571                                              1,519                                            2,090
Electropar                                                    1                                                  -                                                       1
Furnas                                                917                                             1,635                                            2,552
Grand Total                                3,226                                5,928                                9,154
       
Concept of Effective Framework:
Employees in the company
Groups: External Advisor + Employees + Employee Managers + Requested + Requested Managers
Includes: Amnesties in the company
Does not include: Employee director, statutory director, assignees, disability retirees and unpaid leave

 

216 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

Eletrobras Company Investments 2023
*Source: Controllership Department (DFPC)
           
VII.1 Corporate Investment and Partnerships
Generation 1Q23 2Q23 3Q23 4Q23 Total Realized
 Eletrobras                          2.1                   -                        -             -                           2.1
 Eletronorte                        29.8                   -                        -             -                         29.8
 Chesf                      145.0                   -                        -             -                       145.0
 Furnas                      203.2                   -                        -             -                       203.2
 CGT Eletrosul                      143.3                   -                        -             -                       143.3
           
Generation - Deployment 1Q23 2Q23 3Q23 4Q23 Total Realized
Eletrobras          
Eletronorte                                  -                            -                              -                 -                                    -   
Chesf                                2.3                         -                              -                 -                             2.275
Furnas                                  -                            -                              -                 -                                    -   
CGT Eletrosul                                  -                            -                              -                 -                                    -   
           
Generation - Expansion 1Q23 2Q23 3Q23 4Q23 Total Realized
Eletrobras                           -                      -                        -             -                            -   
Eletronorte                         0.0                   -                        -             -                           0.0
Chesf                           -                      -                        -             -                            -   
Furnas                     131.1                   -                        -             -                       131.1
CGT Eletrosul                     140.6                   -                        -             -                       140.6
           
Generation - Maintenance 1Q23 2Q23 3Q23 4Q23 Total Realized
 Eletrobras                            -           
 Eletronorte                        29.8                   -                        -             -                         29.8
 Chesf                      142.7                   -                        -             -                       142.7
 Furnas                        10.3                   -                        -             -                         10.3
 CGT Eletrosul                          2.8                   -                        -             -                           2.8
           
           
Generation -  Partnerships* 1Q23 2Q23 3Q23 4Q23 Total Realized
 Eletrobras                            -                      -                        -             -                            -   
 Eletronorte                            -                      -                        -             -                            -   
 Chesf                            -                      -                        -             -                            -   
 Furnas                            -                      -                        -             -                            -   
 CGT Eletrosul                            -                      -                        -             -                            -   
           
Generation - Acquisition Partnerships 1Q23 2Q23 3Q23 4Q23 Total Realized
 Eletrobras                          2.1                   -                        -             -                           2.1
 Eletronorte                            -                      -                        -             -                            -   
 Chesf                            -           
 Furnas                        61.9                   -                        -             -                         61.9
 CGT Eletrosul                            -           
           
Transmission 1Q23 2Q23 3Q23 4Q23 Total Realized
 Eletrobras                            -                      -                        -             -                            -   
 Eletronorte                        61.1                   -                        -             -                         61.1
 Chesf                      316.0                   -                        -             -                       316.0
 Furnas                        46.9                   -                        -             -                         46.9
 CGT Eletrosul                        55.2                   -                        -             -                         55.2
           
Transmission - Deployment 1Q23 2Q23 3Q23 4Q23 Total Realized
 Eletrobras                            -                      -                        -             -                            -   
 Eletronorte                          0.0                   -                        -             -                           0.0
 Chesf                             -                      -                        -             -                            -   
 Furnas                            -                      -                        -             -                            -   
 CGT Eletrosul           
           
Transmission - Expansion 1Q23 2Q23 3Q23 4Q23 Total Realized
 Eletrobras                            -           
 Eletronorte                          2.8                   -                        -             -                           2.8
 Chesf                           3.9                   -                        -             -                           3.9
 Furnas                            -                      -                        -             -                            -   
 CGT Eletrosul                        23.4                   -                        -             -                         23.4
           
Transmission - Reinforcements and Improvements 1Q23 2Q23 3Q23 4Q23 Total Realized
 Eletrobras                            -           
 Eletronorte                        35.7                   -                        -             -                         35.7
 Chesf                         75.6                   -                        -             -                         75.6
 Furnas                        39.2                   -                        -             -                         39.2
 CGT Eletrosul                        29.8                   -                        -             -                         29.8
           
Transmission - Maintenance 1Q23 2Q23 3Q23 4Q23 Total Realized
 Eletrobras                            -           
 Eletronorte                        15.2                   -                        -             -                         15.2
 Chesf                       236.4                   -                        -             -                       236.4
 Furnas                          7.7                   -                        -             -                           7.7
 Eletrosul                          2.0                   -                        -             -                           2.0
           
Transmission - Financial Inversions in Partnerships 1Q23 2Q23 3Q23 4Q23 Total Realized
 Eletrobras                            -           
 Eletronorte                          7.5                   -                        -             -                           7.5
 Chesf                            -                      -                        -             -                            -   
 Furnas                            -                      -                        -             -                            -   
 CGT Eletrosul                            -           
           
Financial Inversions Acquisition 1Q23 2Q23 3Q23 4Q23 Total Realized
 Eletrobras                            -           
 Eletronorte                            -                      -                        -             -                            -   
 Chesf                            -           
 Furnas                            -                      -                        -             -                            -   
 CGT Eletrosul                            -           
           
Other* 1Q23 2Q23 3Q23 4Q23 Total Realized
 Eletrobras                          9.0                   -                        -             -                           9.0
 Electropar                            -                      -                        -             -                            -   
 Eletronorte                          4.1                   -                        -             -                           4.1
 Chesf                        20.7                   -                        -             -                         20.7
 Furnas                          9.4                   -                        -             -                           9.4
 CGT Eletrosul                          1.9                   -                        -             -                           1.9
           
Company Investment 2023
 1Q23   2Q23   3Q23   4Q23  Total
 Eletrobras                        11.1                   -                        -             -                         11.1
 Electropar                            -                      -                        -             -                            -   
 Eletronorte                        95.0                   -                        -             -                         95.0
 Chesf                      481.6                   -                        -             -                       481.6
 Furnas                      259.5                   -                        -             -                       259.5
 CGT Eletrosul                      200.4                   -                        -             -                       200.4
           
Total                1,048               -                    -           -                  1,048
           
(*) Others are Environmental Quality, Infrastructure  
*CHESF - Itaparica Infrastructure Action - Generation Maintenance for Environmental
* partnerships : expansion and contribution in operation

 

217 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

VI.2 Investments in new projects
                               
VI.2.1 Generation
                               
VI.2.1.1 Integral Responsibility
Eletrobras Company Power plant Source Location
(State)
Investment (R$ Million) Installed Capacity (MW) Physical Guarantee (MW) Start of Concession Start of Operation Beginning of Construction Termination of the Concession Physical Schedule of
Work Performed (%)
Contract Type (Availability or Quantity) Expected annual revenue
(R$ Million)
Investment
Total Expected
Planned Total Investment Reference Date Investment
Accomplished
Furnas (1) TPP Santa Cruz Gas Thermal RJ 677.00 Jul-16 905.25 150 (5) 120.36 08.22.1963 and 03.10.1967 Feb-23 Apr-18 07/07/2015 (2) 99.99% Quantity (4) 232.6 (3)
CGT Eletrosul (6) CGH Cachoeira Branca Hydro MS 13.33 Apr-22 12.06 1.05 0.97   Aug-23 Sep-20   97.80% Quantity 5.1 (7)
CGT Eletrosul (7) (8) (9) UUT Coxilha Negra  Wind RS 2199.32 Dec-21 384.05 302.40 114.70   Feb-24 Aug-22   19.70% Quantity 241.33 (9)
Chesf UEE Casa Nova B Wind BA 102.94 Oct-21 0.89 27.00 10.78 02/07/2023(10) Sep-24 Jul-23 Feb-58 11 12 18.5
                               
(1) The Santa Cruz Plant had 351 MWa marketed in the ACR in the 5th New Energy Auction. However, through the New Energy MCSD, contracts were reduced by 30%, from 2018, to 245.7 MWmed - being fully met by the current units in commercial operation. In this way, the Physical Guarantee for the combined cycle is de-contracted.
(2) Requested to ANEEL extension of the concession under the terms of application REQ.GCO.P.027, of 07/05/2013, whose conditions remain in force, although the new date has not yet been defined.
(3) The reference of the expected annual revenue amount is the August/2017 Business Plan.
(4) Contract in the quantity modality with seasonalization following the generation profile.
(5) The Santa Cruz Plant currently works with gas generation and installed capacity of 350MW. With the entry into operation of the combined cycle there is an increase of 150 of the Steam Turbine, so there is 500 (MW) of installed power.
(6) The request for connection as Distributed Generation was made on 12/29/22 with Energisa and in April it approved the last protocol. The execution of the network and installation of the recloser were carried out in March/23.
(7) Considered P90.
(8) Considered nominal net annual revenue for the year 2025 for the generation scenario P90 Base.
(9) Grant issued on 08/23/2022.
(10) Authorizing Resolution No. 13.606 of 02/07/2023.
(11) Works not started. However, the park is partially implemented, with approximately 60% of completeness.
(12) Contracts will be made in the ACL, by Quantity.

 

 

218 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

VI.2.1.2 Special Purpose Entities
SPE Power plant Source Enterprises
Eletrobras
(%)
Location
(State)
Capacity
Installed
(MW)
Collateral
Physics
(MW)
Beginning of
Construction
Forecast of
Beginning of
 Operation
End of
Concession
Investment
 Predicted
(R$ Million)
Date of
Investment Reference
 Predicted
Investment Realized
(R$ Million) 
Physical Advancement
Accomplished
(%)
Partners
                             
Itaguaçu da Bahia Energia Renováveis S.A. (1) (2) Itaguaçu da Bahia I Wind 98 BA 298.20 136.46 Dec-23 Oct-25 Apr-57 2,265.05 fev-22 2.29 0% Casa dos Ventos Energias Renováveis S.A. (2%)
                             
(1) According to the Business Plan in force.
(2) Furnas' participation in SPE is through the holding Brasil Ventos Energia S.A. (BVE), in which Furnas' shareholding is 100%.

 

219 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

VI.2.2 Transmission 1Q23
VI.2.2.1 Integral Responsibility
VI.2.2.1.1 Transmission Lines
Eletrobras Company Undertaking Base Date
of the
Investment
Investment
(R$ Million)
Investment Realized
(R$ Million)
Extension of
Lines (Km)
Voltage
(kV)
Capacity
 of Transformation (MVA)
Location
 (State)
Start
of Operation
Termination
of the Concession
RAP
(R$ Million)
Base date
of RAP
Readjustment Index Reinforcement and
Improvement
/
Expansion
Investment
year 2023
(R$ Million)
CGT ELETROSUL West Cascavel LT - Guaíra: change in operating voltage from 230kV to 500kV. 03/2023 38.56 35.25 1.77 525 0 PR 04/2023 12/2042 5.31 7/2022 IPCA Reinforcement and Improvement 6.51
Recapacitation of LT 230 kV Blumenau - Joinville Norte 03/2023 14.34 2.69 0 230 0 SC 12/2023 12/2042 2.21 7/2022 IPCA Reinforcement and Improvement 7.25
Recapacitation of LT 230 kV Blumenau - Joinville 03/2023 10.16 1.94 0 230 0 SC 07/2023 12/2042 1.57 7/2022 IPCA Reinforcement and Improvement 8.23
                             
CHESF Sectioning of the 500 kV Luiz Gonzaga - Milagres C1 LT at SE Milagres II 03/2023 36.27 0.49 1.5 500 0 CE, PE 02/2024 12/2042 8.31 7/2022 IPCA Reinforcement and Improvement 0.04
Sectioning of the Sobradinho 500 kV LT - Luiz Gonzaga C2 at SE Juazeiro III 03/2023 41.65 0.78 0.64 500 0 BA, PE 04/2024 12/2042 6.97 7/2022 IPCA Reinforcement and Improvement 11.50
Reheading of LT 230 kV Recife II - Pirapama II C2 in SE Jaboatão II 03/2023 4.46 3.38 0 230 0 PE 06/2023 12/2042 1.24 7/2022 IPCA Reinforcement and Improvement 2.43
Secc. LT 500 kV Angelim II - Recife II at SE Suape II. 03/2023 192.73 98.91 49.74 500 0 PE 09/2023 12/2042 21.25 7/2022 IPCA Reinforcement and Improvement 65.99
LT 230 kV PIRIPIRI / SOBRAL - recapacitation of short-term capacity from 595 A to 630 A. 03/2023 35.57 12.07 0 230 0 CE, PI 12/2023 12/2042 1.55 7/2022 IPCA Reinforcement and Improvement 26.11
Secc. LT 230 Olindina/Catu in SE Alagoinhas II 03/2023 24.66 0.00 0.94 230 0 BA 11/2025 12/2042 4.77 7/2022 IPCA Reinforcement and Improvement 0.00
                             
ELETRONORTE Sectioning of 138kV Rondonópolis-Couto Magalhães LT at SE Petrovina 12/2022 39.55 0.52 0.56 138 0 MT 02/2024 12/2042 3.80 7/2022 IPCA Reinforcement and Improvement 13.21
                             
FURNAS SE Rio dos Bois - Sectioning LT 138kV Rio Verde / Cachoeira Dourada 03/2023 0.08 0.08 0.46 138 0 GO 01/2026 12/2042 2.31 7/2022 IPCA Reinforcement and Improvement 0.08
LT 138kV Angra/Angra (ENEL) 03/2023 67.78 17.74 0 138 0 RJ 11/2024 12/2042 3.99 7/2022 IPCA Reinforcement and Improvement 35.60
SE Iriri 2R - Sectioning LT 138kV Rocha Leão / Campos C1 03/2023 20.18 0.45 0.5 138 0 RJ 06/2024 12/2042 1.86 7/2022 IPCA Reinforcement and Improvement 4.62

 

 

220 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

VI.2.2.1.2 Substations                              
Eletrobras Company Undertaking Base Date
of the
Investment
Investment
(R$ Million)
Investment Realized
(R$ Million)
Extension
from:
Lines
(km)
Voltage
(kV)
Capacity
 of Transformation (MVA)
Location
 (State)
Start
of Operation
Termination
of the Concession
RAP
(R$ Million)
Base date
of RAP
Readjustment Index Reinforcement and
Improvement
/
Expansion
Investment
year 2023
(R$ Million)
CGT ELETROSUL Installation of the 1st 230kV bar reactor at SE Anastácio 03/2023 14.28 1.48 0 230 0 MS 10/2023 12/2042 2.90 7/2022 IPCA Reinforcement and Improvement 9.15
Improvement in Farroupilha SE - three-phase transformer replacement - TF2 - 230/69 kV - 88 MVA 11/2022 15.49 0.69 0 230 0 RS 06/2024 12/2042 2.05 7/2022 IPCA Reinforcement and Improvement 7.50
Improvement in SE Assis - replacement of single-phase transformer TF1 - 440/230 kV, 336 MA 11/2022 27.95 0.42 0 440 0 SP 06/2024 12/2042 6.18 7/2022 IPCA Reinforcement and Improvement 13.51
Improvement in SE Assis - replacement of reserve single-phase transformer - TFR1, 440/230 kV, 112 MVA 11/2022 9.32 0.14 0 440 0 SP 06/2024 12/2042 2.06 7/2022 IPCA Reinforcement and Improvement 4.50
Sand SE Improvement - Single Phase Autotransformer Replacement, TF2, 525/230 kV, 672 MVA 12/2021 39.25 1.92 0 525 0 PR 09/2024 12/2042 8.84 7/2022 IPCA Reinforcement and Improvement 6.71
Improvement in SE Blumenau - replacement of three-phase transformer TF3, 230/138 kV , 150 MVA 03/2023 10.19 2.38 0 230 0 SC 07/2023 12/2042 2.58 7/2022 IPCA Reinforcement and Improvement 1.78
Improvement in SE Blumenau - replacement of three-phase transformer TR4, 230/138 kV, 150 MVA 03/2023 10.19 2.38 0 230 0 SC 07/2023 12/2042 2.58 7/2022 IPCA Reinforcement and Improvement 1.78
Improvement in SE Blumenau - replacement of capacitor bank BC1, 230 kV, 125 MVAr 03/2023 2.40 0.56 0 230 0 SC 03/2024 12/2042 0.57 7/2022 IPCA Reinforcement and Improvement 0.42
Improvement in SE Blumenau - replacement of capacitor bank BC2, 230 kV, 125 MVAr 03/2023 2.40 0.56 0 230 0 SC 03/2024 12/2042 0.57 7/2022 IPCA Reinforcement and Improvement 0.42
Improvement in SE Blumenau - replacement of single-phase autotransformer TF5, Phases A, B and C, 672 MVA 03/2023 34.78 8.11 0 525 0 SC 09/2024 12/2042 8.84 7/2022 IPCA Reinforcement and Improvement 6.06
Improvement in Curitiba SE - replacement of the single-phase reactor RE2, 525 kV, 150 MVAr, Phases A, B and C 12/2021 10.48 0.51 0 525 0 PR 07/2024 12/2042 2.41 7/2022 IPCA Reinforcement and Improvement 1.80
Improvement in Curitiba SE - replacement of the single-phase reserve reactor RER1, 525 kV, 50 MVAr 12/2021 3.49 0.17 0 525 0 PR 07/2024 12/2042 0.80 7/2022 IPCA Reinforcement and Improvement 0.60
Improvement in Curitiba SE - replacement of the single-phase autotransformer reserve 525/230 kV, 224 MVA 12/2021 12.82 0.62 0 525 0 PR 07/2024 12/2042 2.95 7/2022 IPCA Reinforcement and Improvement 2.20
Improvement in Curitiba SE - replacement of the single-phase autotransformer TF2, 525/230 kV , 672 MVA 12/2021 38.47 1.86 0 525 0 PR 07/2024 12/2042 8.84 7/2022 IPCA Reinforcement and Improvement 6.60
Improvement in Gravataí SE - replacement of the reserve single-phase autotransformer, 525/230 kV , 224 MVA 12/2021 21.59 0.09 0 525 0 RS 09/2024 12/2042 2.95 7/2022 IPCA Reinforcement and Improvement 3.71
Improvement in Curitiba SE - replacement of the single-phase autotransformer TF1, Phases B and C, 672 MVA 12/2021 22.09 1.07 0 525 0 PR 07/2024 12/2042 5.08 7/2022 IPCA Reinforcement and Improvement 3.79
Improvement in Gravataí SE - replacement of phases A and C, TF1 525/230 kV , 224 MVA each 12/2021 37.19 0.15 0 525 0 RS 09/2024 12/2042 5.08 7/2022 IPCA Reinforcement and Improvement 6.39
Reinforcement in SE Gravataí - Installation of a bank of 525 kV, (3+1R)x50 Mvar bar reactors and connections 03/2023 27.62 0.00 0 525 0 RS 01/2025 12/2042 7.41 7/2022 IPCA Reinforcement and Improvement 1.38
Improvement in Gravatai SE: single-phase reactor replacement, RE2, 525 kV, 3x50 Mvar, Phases A and C 03/2023 11.26 0.00 0 525 0 RS 03/2025 12/2042 1.61 7/2022 IPCA Reinforcement and Improvement 0.17
Improvement in SE Campos Novos: single-phase reactor replacement, RE1, 525 kV, 3x33,333 Mvar 03/2023 15.98 0.00 0 525 0 SC 01/2026 12/2042 2.29 7/2022 IPCA Reinforcement and Improvement 0.24
Improvement in SE Campos Novos: single-phase reactor replacement, 525 kV, 33.333 Mvar, Reserve Phase 1 03/2023 5.33 0.00 0 525 0 SC 01/2026 12/2042 0.76 7/2022 IPCA Reinforcement and Improvement 0.08
Improvement in SE Campos Novos: single-phase reactor replacement, RE2, 525 kV, 3x33,333 Mvar 03/2023 15.98 0.00 0 525 0 SC 01/2026 12/2042 2.29 7/2022 IPCA Reinforcement and Improvement 0.24
Improvement in SE Itá: single-phase reactor replacement, RE1, 525 kV, 3x50 Mvar 03/2023 16.88 0.00 0 525 0 SC 01/2026 12/2042 2.42 7/2022 IPCA Reinforcement and Improvement 0.25
Improvement in SE Itá: replacement of single-phase reactor, RTR1, 525 kV, 50 Mvar, Reserve Phase 1 03/2023 5.63 0.00 0 525 0 SC 01/2026 12/2042 0.81 7/2022 IPCA Reinforcement and Improvement 0.08
Improvement in SE Gravataí 2: replacement of the capacitor bank, BC4, 230 kV, 100 Mvar 03/2023 3.23 0.00 0 230 0 RS 01/2026 12/2042 0.40 7/2022 IPCA Reinforcement and Improvement 0.05
Improvement in SE Gravataí 2: replacement of the capacitor bank, BC5, 230 kV, 100 Mvar 03/2023 3.23 0.00 0 230 0 RS 01/2026 12/2042 0.40 7/2022 IPCA Reinforcement and Improvement 0.05
Improvement in SE Palhoça: replacement of the capacitor bank, BC1, 230 kV, 50 Mvar 03/2023 2.81 0.00 0 230 0 SC 01/2026 12/2042 0.33 7/2022 IPCA Reinforcement and Improvement 0.04
Improvement in SE Gravataí: replacement of single-phase autotransformer, TF2, 525/230 kV, 3x224 MVA 03/2023 47.54 0.00 0 525 0 RS 12/2024 12/2042 6.95 7/2022 IPCA Reinforcement and Improvement 0.72
Improvement in SE Gravataí: Replacement of TF3 single-phase autotransformer, 525/230 kV, 3x224 MVA 03/2023 47.54 0.00 0 525 0 RS 12/2024 12/2042 6.95 7/2022 IPCA Reinforcement and Improvement 0.72
Improvement in SE Passo Fundo: replacement of TF3 single-phase autotransformer, 230/138 kV, 3x28 MVA 03/2023 21.51 0.00 0 230 0 RS 01/2026 12/2042 2.90 7/2022 IPCA Reinforcement and Improvement 0.32
Improvement in SE Passo Fundo: replacement of the autotransformer, 230/138 kV, 28 MVA, Reserve Phase 03/2023 7.17 0.00 0 230 0 RS 01/2026 12/2042 1.03 7/2022 IPCA Reinforcement and Improvement 0.11
Improvement of Campo Grande SE: replacement of Capacitor Bank, BC1, 138 kV, 30 Mvar 03/2023 2.18 0.00 0 230 0 MS 01/2026 12/2042 0.35 7/2022 IPCA Reinforcement and Improvement 0.03
Improvement in SE Londrina: replacement of autotransformer bank, TF3, 525/230 kV, 3x224 MVA 03/2023 47.54 0.00 0 525 0 PR 01/2026 12/2042 6.95 7/2022 IPCA Reinforcement and Improvement 0.72
Improvement in SE Blumenau: replacement of Phase C of TF6, 525/230 kV, 224 MVA 03/2023 15.85 0.00 0 525 0 SC 12/2024 12/2042 1.98 7/2022 IPCA Reinforcement and Improvement 0.24
Improvement in SE Curitiba: replacement of Phase A of RE1, 525 kV, 50 Mvar 03/2023 5.63 0.00 0 525 0 PR 12/2024 12/2042 0.81 7/2022 IPCA Reinforcement and Improvement 0.08
Improvement in SE Santo Ângelo: replacement of the bank of single-phase reactors, RE1, 525 kV, 3x50 Mvar 03/2023 16.88 0.00 0 525 0 RS 01/2026 12/2042 1.75 7/2022 IPCA Reinforcement and Improvement 0.25
Improvement in SE Dourados: replacement of three-phase autotransformer, TF1, 230/138 kV, 75 MVA 03/2023 12.40 0.00 0 230 0 MS 01/2026 12/2042 1.86 7/2022 IPCA Reinforcement and Improvement 0.19
Improvement in Dourados SE: replacement of TF3 three-phase autotransformer, 230/138 kV, 75 MVA 03/2023 12.40 0.00 0 230 0 MS 01/2026 12/2042 1.86 7/2022 IPCA Reinforcement and Improvement 0.19
Improvement in SE Dourados: replacement of the three-phase autotransformer, TF4, 230/138 kV, 75 MVA 03/2023 12.40 0.00 0 230 0 MS 01/2026 12/2042 1.86 7/2022 IPCA Reinforcement and Improvement 0.19

 

221 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

CHESF SE Morro do Chapéu II - Installation of the second transformer 230/69 kV, 150 MVA and connections. 03/2023 17.69 4.45 0 230/69 150 BA 09/2023 10/2041 3.03 7/2022 IPCA Reinforcement and Improvement 13.45
SE Milagres - Installation of the fourth 230/69 kV, 100 MVA transformer and connections 03/2023 31.23 6.34 0 230/69 100 EC 02/2024 12/2042 3.25 7/2022 IPCA Reinforcement and Improvement 0.00
SE Good Hope (Improvements)- Replacement of single-phase reactors 03/2023 22.71 23.21 0 500 0 PI 04/2023 12/2042 3.61 7/2022 IPCA Reinforcement and Improvement 0.50
SE Icó - Installation of the third transformer, 230/69 kV, 100 MVA and connections. 03/2023 41.75 14.20 0 230/69 100 EC 02/2024 12/2042 2.74 7/2022 IPCA Reinforcement and Improvement 5.53
SE Eunápolis - installation of the first capacitor bank in three-phase derivation 230 kV - 20 MVar 03/2023 16.98 1.73 0 230 0 BA 10/2023 12/2042 1.72 7/2022 IPCA Reinforcement and Improvement 16.45
Installation of the 1st Bar Reactor Bank 500 kV - 3X50 MVA in Sobral III Substation 03/2023 47.27 18.25 0 500 0 EC 02/2024 12/2042 4.92 7/2022 IPCA Reinforcement and Improvement 0.06
3rd AUTOTRANSFORMER BANK 500/230-13.8 kV, 3x200 MVA and connections, in SE Messias. 03/2023 86.22 74.34 0 500/230 600 AL 07/2023 12/2042 10.14 7/2022 IPCA Reinforcement and Improvement 18.87
SE São João do Piauí - Installation of the second autotransformer 500/230 kV, 300 MVA and connections. 03/2023 64.35 42.57 0 500/230 300 PI 11/2023 12/2042 6.36 7/2022 IPCA Reinforcement and Improvement 4.07
SE Camaçari II - Longitudinal sectioning of 230 kV bars and associated adjustments. 03/2023 19.02 19.02 0 230 0 BA 08/2023 12/2042 3.84 7/2022 IPCA Reinforcement and Improvement 0.00
SE Recife II - Longitudinal sectioning of 230 kV bars and associated adjustments. 03/2023 28.86 28.89 0 230 0 PE 10/2023 12/2042 6.29 7/2022 IPCA Reinforcement and Improvement 0.00
Installation in SE Aquiraz II of the 4th Three-Phase Transformer and the 2nd Grounding Transformer 03/2023 30.70 1.60 0 230/69 150 EC 10/2023 07/2040 2.67 7/2022 IPCA Reinforcement and Improvement 29.57
SE São João do Piauí (Improvements) 03/2023 4.61 3.48 0 500 0 PI 03/2024 12/2042 0.51 7/2022 IPCA Reinforcement and Improvement 1.14
SE Governador Mangabeira (Improvements) 03/2023 32.51 0.13 0 230 0 BA 05/2024 12/2042 1.64 7/2022 IPCA Reinforcement and Improvement 15.40
SE Jacaracanga TR1 (Improvements) 03/2023 15.71 0.23 0 230 0 BA 05/2024 12/2042 1.64 7/2022 IPCA Reinforcement and Improvement 0.00
SE Jacaracanga TR2 (Improvements) 03/2023 15.61 0.13 0 230 0 BA 05/2024 12/2042 1.64 7/2022 IPCA Reinforcement and Improvement 0.00
SE Jardim (Improvements) 03/2023 12.79 0.23 0 230 0 SE 05/2024 12/2042 1.64 7/2022 IPCA Reinforcement and Improvement 0.00
SE Matatu (Improvements) 03/2023 17.69 0.19 0 230 0 BA 05/2024 12/2042 1.64 7/2022 IPCA Reinforcement and Improvement 0.00
SE Banabuiú (Improvements) 12/2022 6.93 0.00 0 230 0 EC 05/2024 12/2042 1.04 7/2022 IPCA Reinforcement and Improvement 0.43
SE Angelim II 03/2023 28.68 0.24 0 500 0 PE 06/2024 12/2042 3.03 7/2022 IPCA Reinforcement and Improvement 0.00
SE Olindina 03/2023 28.30 0.32 0 500 0 BA 05/2024 12/2042 3.03 7/2022 IPCA Reinforcement and Improvement 0.00
SE Poções II - 3rd Trafo 03/2023 29.17 0.02 0 230/138 100 BA 04/2024 05/2042 4.25 7/2022 IPCA Reinforcement and Improvement 5.64
SE Campina Grande III - 500 kV Reactor Bank 03/2023 36.09 0.00 0 500 0 PB 04/2025 10/2041 3.53 7/2022 IPCA Reinforcement and Improvement 1.09
Improvement in SE Camacari II - replacement of RT1 reactor, 500 kV, 100 Mvar 03/2023 11.20 0.05 0 500 0 BA 05/2025 12/2042 2.21 7/2022 IPCA Reinforcement and Improvement 0.00
Improvement in SE Camacari II - replacement of RTR1 reserve reactor, 500 kV, 33.3 Mvar 03/2023 3.32 0.00 0 500 0 BA 05/2025 12/2042 0.74 7/2022 IPCA Reinforcement and Improvement 0.00
Improvement in SE Recife II - RT2 reactor replacement, 500 kV, 100 Mvar 03/2023 11.24 0.10 0 500 0 PE 05/2025 12/2042 2.21 7/2022 IPCA Reinforcement and Improvement 0.00
Improvement in SE Recife II - replacement of RTR1 reserve reactor, 500 kV, 33.3 Mvar 03/2023 3.39 0.07 0 500 0 PE 05/2025 12/2042 0.74 7/2022 IPCA Reinforcement and Improvement 0.00
Improvement in U.Sobradinho 500 kV - replacement of the RTR1 reserve shunt reactor, 500 kV, 33.3 Mvar 03/2023 3.32 0.00 0 500 0 BA 05/2025 12/2042 0.74 7/2022 IPCA Reinforcement and Improvement 0.00
SE Bongi - Installation of the 5th transformer  and replacement of three transformers 03/2023 127.05 0.49 0 230 500 PE 10/2025 12/2042 16.31 7/2021 IPCA Reinforcement and Improvement 2.80
SE Teresina II - 2nd reactor bank 500 kV 03/2023 42.30 0.00 0 500 0 PI 05/2025 12/2042 7.54 7/2022 IPCA Reinforcement and Improvement 0.00
SE Camaçari II 03/2023 11.99 0.00 0 230 0 BA 07/2024 07/2040 1.54 7/2022 IPCA Reinforcement and Improvement 0.00
SE São João do Piauí 3rd Trafo 500/230 3x100 MVA 03/2023 72.15 0.00 0 500/230 300 PI 03/2025 12/2042 12.81 7/2022 IPCA Reinforcement and Improvement 0.00

 

222 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

ELETRONORTE SE Guamá - Replacement of power transformer TR1 230/69 kV- (3+1)x50 MVA (Improvement) 12/2022 41.24 1.57 0 230 0 PA 06/2024 12/2042 3.19 7/2022 IPCA Reinforcement and Improvement 0.95
SE Guamá - Replacement of power transformer TR2 230/69 kV- 3x50 MVA (Improvement) 12/2022 47.56 1.37 0 230 0 PA 09/2023 12/2042 4.21 7/2022 IPCA Reinforcement and Improvement 36.03
SE Utinga - Replacement of power transformer TF1 230/69 kV- 3x50 MVA (Improvement) 03/2023 34.73 5.20 0 230 0 PA 06/2023 12/2042 3.15 7/2022 IPCA Reinforcement and Improvement 26.99
SE Utinga - Replacement of power transformer TF2 230/69 kV- 3x50 MVA (Improvement) 12/2022 37.71 3.21 0 230 0 PA 02/2024 12/2042 3.18 7/2022 IPCA Reinforcement and Improvement 7.83
SE Vila do Conde - Replacement of 4 banks of capacitors 230 kV, 111 MVAr each. (Improvement) 12/2022 55.76 0.28 0 230 0 PA 05/2024 12/2042 1.85 7/2022 IPCA Reinforcement and Improvement 28.14
SE Vila do Conde-Replacement of reactor banks 500 kV, (3+1)x55 MVAr (Improvement) 12/2022 29.27 6.83 0 500 0 PA 06/2023 12/2042 2.60 7/2022 IPCA Reinforcement and Improvement 25.82
SE Colinas - Replacement of fixed series compensation BC2 500 kV, 161 MVA (Improvement) 12/2022 50.96 0.18 0 500 0 TO 03/2024 12/2042 10.04 7/2022 IPCA Reinforcement and Improvement 5.42
Imperatriz SE-Replacement of the reactor RT1 500 kV, 3x50 MVAr, and RTR5 500 kV, 50 MVAr (Improvement) 12/2022 48.54 1.09 0 500 0 MA 11/2023 12/2042 2.49 7/2022 IPCA Reinforcement and Improvement 25.09
SE Empress-Replacement of compensation series BC2 500kV, 451 Mvar. (Improvement) 12/2022 71.76 1.74 0 500 0 MA 12/2023 12/2042 13.22 7/2022 IPCA Reinforcement and Improvement 17.84
Imperatriz SE-Replacement of the reactor RT3 500 kV, 3x33.3 MVAr, and RTR4 500 kV, 33.3 MVAr (Improvement) 12/2022 48.46 0.96 0 500 0 MA 09/2023 12/2042 2.35 7/2022 IPCA Reinforcement and Improvement 37.29
SE Marabá - Replacement of BC2 series compensation 500kV,283 Mvar. (Improvement) 12/2022 64.85 1.00 0 500 0 PA 01/2024 12/2042 10.84 7/2022 IPCA Reinforcement and Improvement 7.79
SE Marabá-Replacement of 500kV RT3.3x45.33Mvar reactors. (Improvement) 12/2022 51.28 6.48 0 500 0 PA 06/2023 12/2042 1.90 7/2022 IPCA Reinforcement and Improvement 39.74
SE Marabá - Replacement of reactors 500kV RTR2, 45.33Mvar, and RT2.3x45.33Mvar. (Improvement) 12/2022 46.33 0.82 0 500 0 PA 11/2023 12/2042 2.56 7/2022 IPCA Reinforcement and Improvement 22.47
SE Rondonópolis-Replacement of BC1 230 kV, 30 MVAr. (Improvement) 12/2022 18.20 4.74 0 230 0 MT 06/2023 12/2042 0.37 7/2022 IPCA Reinforcement and Improvement 15.32
SE Pres. Dutra-Replacement of reactors 500 kV RTR1, 50 Mvar, and RTR1, 33.3Mvar (Improvement) 12/2022 9.86 5.04 0 500 0 MA 04/2023 12/2042 1.25 7/2022 IPCA Reinforcement and Improvement 5.20
SE Pres. Dutra-Substitution of compensation series BC2 500 kV, 454 Mvar. (Improvement) 12/2022 79.23 2.10 0 500 0 MA 12/2023 12/2042 13.20 7/2022 IPCA Reinforcement and Improvement 26.51
SE P.OTHER-Replacement of a Reactor Bank RT7 500 kV - 136 Mvar. (Improvement) 03/2023 20.55 8.18 0 500 0 MA 07/2023 12/2042 1.83 7/2022 IPCA Reinforcement and Improvement 10.93
SE Miranda II - Installation of TR3 230/69 kV, 100MVA. 12/2022 29.61 1.04 0 230 100 MA 12/2023 12/2042 8.69 7/2022 IPCA Reinforcement and Improvement 10.30
SE Vilhena - 230kV bar RT8 reactor installation 12/2022 17.85 0.07 0 230 0 RO 02/2024 12/2042 2.14 7/2022 IPCA Reinforcement and Improvement 5.38
SE Vilhena - installation of the RT9 reactor of 230kV bar. 12/2022 17.85 0.07 0 230 0 RO 04/2024 12/2042 2.15 7/2022 IPCA Reinforcement and Improvement 5.38
SE Marabá: Replacement TF2 230/69 kV, 33MVA, per 100 MVA unit 12/2022 32.18 0.51 0 230 67 PA 05/2024 12/2042 4.66 7/2022 IPCA Reinforcement and Improvement 8.00
Improvement in SE P. Dutra - RT4 reactor replacement, 500 kV, 3x50 MVAr 12/2022 27.49 0.31 0 500 0 MA 08/2024 12/2042 2.32 7/2022 IPCA Reinforcement and Improvement 8.96
Improvement in SE P. Dutra - RT5 reactor replacement, 500 kV, 3x33.33 MVAr 12/2022 27.49 0.31 0 500 0 MA 08/2024 12/2042 2.20 7/2022 IPCA Reinforcement and Improvement 8.96
Improvement in SE P. Dutra - RT6 reactor replacement, 500 kV, 3x33.33 MVAr 12/2022 27.49 0.29 0 500 0 MA 04/2026 12/2042 2.22 7/2022 IPCA Reinforcement and Improvement 4.48
Improvement in Imperatriz SE - replacement of RT2 reactor, 500 kV , 3x50 MVAr 12/2022 20.28 0.28 0 500 0 MA 07/2024 12/2042 2.32 7/2022 IPCA Reinforcement and Improvement 9.05
Improvement in Imperatriz SE - replacement of RT6 reactor, 500 kV , 3x45.33 MVAr 12/2022 26.68 0.33 0 500 0 MA 04/2026 12/2042 2.23 7/2022 IPCA Reinforcement and Improvement 0.12
Improvement in the Imperatriz SE - replacement of the single-phase RTR6 reactor, 500 kV , 1x45.33 MVAr 12/2022 8.89 0.11 0 500 0 MA 04/2026 12/2042 0.74 7/2022 IPCA Reinforcement and Improvement 0.04
Improvement SE P. Dutra - RT1 reactor replacement, 500 kV, 3x50 MVAR 12/2022 45.51 0.09 0 500 0 MA 04/2026 12/2042 2.26 7/2022 IPCA Reinforcement and Improvement 0.61
Improvement in SE São Luis II - RT3 reactor replacement, 500 kV, 3x45.33 MVAR 12/2022 26.68 0.14 0 500 0 MA 04/2026 12/2042 2.23 7/2022 IPCA Reinforcement and Improvement 0.12
Improvement in SE São Luís II - replacement of the reserve reactor RTR1, 500 kV, 1x45.33 MVAR 12/2022 8.89 0.05 0 500 0 MA 04/2026 12/2042 0.74 7/2022 IPCA Reinforcement and Improvement 0.04
Marabá SE improvement - RT1 reactor replacement, 500 kV, 3x50 MVAR 03/2023 19.52 0.07 0 500 0 PA 07/2024 12/2042 2.41 7/2022 IPCA Reinforcement and Improvement 2.66
Improvement in SE Marabá - Replace the MBCL7-01, BC1 500 kV, 3x116 MVAr series capacitor bank 03/2023 78.07 0.29 0 500 0 PA 10/2025 12/2042 11.05 7/2022 IPCA Reinforcement and Improvement 10.63
SE Porto Velho: Installation of 2 500 kV bar reactors, (6 + 1R) x 50 Mvar and connection modules 03/2023 90.13 0.30 0 500 0 RO 11/2024 02/2039 7.36 7/2022 IPCA Reinforcement and Improvement 10.30
SE Imperatriz - Replacement of the Series Capacitor Bank 12/2022 63.00 0.00 0 500 0 MA 02/2026 12/2042 14.12 7/2022 IPCA Reinforcement and Improvement 1.13
SE 230/138 kV Caladinho II and sectioning of LT 230 kV Coletora Porto Velho - Porto Velho, C2. 12/2022 125.21 2.91 6.36 230 80 RO 07/2025 09/2052 12.25 7/2022 IPCA Expansion 22.76

 

223 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

FURNAS SE Adrianópolis - Reactor Replacement, AT53, AT1B, AT2A and AT2B 03/2023 63.92 62.83 0 345/138 0 RJ 07/2023 12/2042 10.40 7/2022 IPCA Reinforcement and Improvement 0.35
SE Itumbiara 16R 03/2023 27.46 15.02 0 345/230 0 MG 07/2023 12/2042 3.14 7/2022 IPCA Reinforcement and Improvement 17.20
SE Itumbiara 17R 03/2023 19.00 11.53 0 500 0 MG 06/2023 12/2042 3.19 7/2022 IPCA Reinforcement and Improvement 10.67
SE Itumbiara 18R 03/2023 103.73 17.81 0 500/345 0 MG 07/2024 12/2042 17.03 7/2022 IPCA Reinforcement and Improvement 63.87
SE Barreiro 1R 03/2023 11.60 6.68 0 345 0 MG 06/2023 12/2042 0.83 7/2022 IPCA Reinforcement and Improvement 5.00
SE Angra 7R 03/2023 9.33 5.66 0 500 0 RJ 06/2023 12/2042 1.41 7/2022 IPCA Reinforcement and Improvement 4.13
SE Campos 20R 03/2023 55.13 48.53 0 138 0 RJ 08/2023 12/2042 11.28 7/2022 IPCA Reinforcement and Improvement 7.35
SE Zona Oeste 3R 03/2023 82.29 5.41 0 500/138 900 RJ 11/2023 12/2042 9.59 7/2022 IPCA Reinforcement and Improvement 76.80
SE Itaberá 9R 03/2023 104.29 0.88 0 765 0 SP 06/2024 12/2042 9.25 7/2022 IPCA Reinforcement and Improvement 29.02
SE Adrianópolis 03/2023 54.33 0.59 0 500 0 RJ 07/2024 12/2042 9.66 7/2022 IPCA Reinforcement and Improvement 10.64
SE Poços de Caldas 19R 03/2023 54.14 2.46 0 500 40 MG 03/2024 12/2042 11.14 7/2022 IPCA Reinforcement and Improvement 19.60
SE Bandeirantes 14R 03/2023 9.52 0.24 0 345/230 0 GO 04/2024 12/2042 1.46 7/2022 IPCA Reinforcement and Improvement 6.32
SE Rio Verde 18R 03/2023 14.15 0.72 0 138 0 GO 09/2023 12/2042 1.62 7/2022 IPCA Reinforcement and Improvement 13.44
SE Campinas 03/2023 55.39 1.18 0 500 0 SP 12/2024 12/2042 9.82 7/2022 IPCA Reinforcement and Improvement 17.75
SE Vitória - replacement of phase A of the single-phase transformer TR4, 345/138 kV, 75 MVA. 03/2023 6.01 0.01 0 345/138 0 ES 04/2025 12/2042 0.91 7/2022 IPCA Reinforcement and Improvement 0.00
SE Bras. Sul - revitalization of single-phase transformer TR1, 345/138 kV, 3x50 MVA 03/2023 21.28 0.00 0 345/138 0 DF 03/2025 12/2042 4.24 7/2022 IPCA Reinforcement and Improvement 13.87
SE Poços de Caldas - replacement of the backup transformer, 345/138 kV, 1x50 MVA 03/2023 11.12 0.33 0 345/138 0 MG 11/2024 12/2042 1.38 7/2022 IPCA Reinforcement and Improvement 2.77
SE Poços de Caldas - replacement of phase C of transformer TR1, 345/138 kV, 1x50 MVA 03/2023 10.73 0.29 0 345/138 0 MG 11/2024 12/2042 1.20 7/2022 IPCA Reinforcement and Improvement 2.37
SE Poços de Caldas - replacement of the single-phase transformer TR2, 345/138 kV, 3x50 MVA 03/2023 16.39 0.97 0 345/138 0 MG 11/2024 12/2042 4.15 7/2022 IPCA Reinforcement and Improvement 8.03
SE Ivaiporã - replacement of phase B and C of the single-phase reactor RIA1, 750 kV, 2x110 MVAr 03/2023 18.60 0.00 0 750 0 PR 04/2025 12/2042 2.22 7/2022 IPCA Reinforcement and Improvement 6.35
SE Ivaiporã - replacement of phase A of the single-phase reactor RIA2, 750 kV, 1x110 MVAr 03/2023 9.30 0.00 0 750 0 PR 04/2025 12/2042 1.11 7/2022 IPCA Reinforcement and Improvement 3.17
SE Campos - replacement of phase A and B of the single-phase reactor RT5, 345 kV, 2x20 MVAr 03/2023 14.50 0.00 0 345 0 RJ 04/2025 12/2042 0.90 7/2022 IPCA Reinforcement and Improvement 0.50
SE Bras. Sul - replacement of the single-phase transformer TR6, 345/230 kV, 3x75 MVA 03/2023 21.39 1.04 0 345/230 0 DF 12/2024 12/2042 5.22 7/2022 IPCA Reinforcement and Improvement 7.74
SE Cach. Paulista - replacement of the single-phase transformer TR57, 500/138 kV, 3x83.33 MVA 03/2023 27.94 0.09 0 500/138 0 SP 04/2027 12/2042 5.57 7/2022 IPCA Reinforcement and Improvement 0.00
SE Cach. Paulista - replacement of the single-phase transformer TR59, 500/138 kV, 3x83.33 MVA 03/2023 27.94 0.09 0 500/138 0 SP 04/2027 12/2042 5.57 7/2022 IPCA Reinforcement and Improvement 0.00
SE Cach. Paulista - replacement of the reserve transformer TRR1, 500/138 kV, 1x83.33 MVA 03/2023 4.73 0.09 0 500/138 0 SP 04/2027 12/2042 1.86 7/2022 IPCA Reinforcement and Improvement 0.00
SE Campinas - replacement of the single-phase transformer TR51, 500/345 kV, 3x186.66 MVA 03/2023 32.77 0.07 0 500/345 0 SP 04/2027 12/2042 8.26 7/2022 IPCA Reinforcement and Improvement 0.20
SE Itaberá - replacement of phase C of the single-phase reactor RIV2, 750 kV, 1x110 MVAr 03/2023 14.83 13.72 0 750 0 SP 04/2023 12/2042 1.09 7/2022 IPCA Reinforcement and Improvement 0.11
SE Araraquara FUR - Replacement of RTPC reactor, 500kV, 3x24.4667 MVAr 03/2023 14.54 0.13 0 500 0 SP 09/2024 12/2042 2.19 7/2022 IPCA Reinforcement and Improvement 4.55
SE Araraquara FUR - Replacement of reactor RMR1, 500kV, 3x24.4667 MVAr 03/2023 14.54 0.13 0 500 0 SP 09/2024 12/2042 2.19 7/2022 IPCA Reinforcement and Improvement 4.55
SE Araraquara FUR - Replacement of reactor, RMR2, 500kV, 3x24.4667 MVAr 03/2023 14.54 0.13 0 500 0 SP 09/2024 12/2042 2.19 7/2022 IPCA Reinforcement and Improvement 4.55
SE Araraquara FUR - Replacement of reactor, RTCA, 500kV, 3x24,4667 MVAr 03/2023 14.54 0.13 0 500 0 SP 04/2027 12/2042 2.19 7/2022 IPCA Reinforcement and Improvement 4.55
Revitalization of SE Ibiúna - revitalization of phase C 03/2023 27.23 10.52 0 345/122 0 SP 08/2023 12/2042 3.31 7/2022 IPCA Reinforcement and Improvement 4.35
SE IBIUNA: Revitalization of the Unit currently in the Reserve 03/2023 27.23 5.25 0 345/122 0 SP 04/2023 12/2042 3.31 7/2022 IPCA Reinforcement and Improvement 4.35
SE Ivaiporã - Replacement of compensation series LT 765kV Ivaiporã / Itaberá C1 03/2023 139.38 0.00 0 65 0 PR 04/2026 12/2042 22.12 7/2022 IPCA Reinforcement and Improvement 24.38
SE Ivaiporã - Replacement of compensation series LT 765kV Ivaiporã / Itaberá C2 03/2023 139.38 0.00 0 65 0 PR 04/2026 12/2042 22.12 7/2022 IPCA Reinforcement and Improvement 24.38
SE Ivaiporã - Replacement of compensation series LT 765kV Ivaiporã / Itaberá C3 03/2023 139.38 0.00 0 65 0 PR 04/2026 12/2042 22.12 7/2022 IPCA Reinforcement and Improvement 24.38
SE Itaberá - Replacement of the series compensation of 765kV Itaberá / Tijuco Preto C1 03/2023 137.16 0.01 0 765 0 SP 04/2026 12/2042 23.12 7/2022 IPCA Reinforcement and Improvement 29.99
SE Itaberá - Replacement of the series compensation of 765kV Itaberá / Tijuco Preto C2 03/2023 137.16 0.01 0 765 0 SP 04/2026 12/2042 23.12 7/2022 IPCA Reinforcement and Improvement 29.99
SE Itaberá - Replacement of the series compensation of LT 765kV Itaberá / Tijuco Preto C3 03/2023 137.16 0.01 0 765 0 SP 04/2026 12/2042 23.12 7/2022 IPCA Reinforcement and Improvement 29.99
SE Itabera - Replacement of phases A and B of the RT1 765kV reactor bank 03/2023 12.45 0.00 0 765 0 SP 05/2024 12/2042 2.14 7/2022 IPCA Reinforcement and Improvement 4.18
SE Viana - Installation of the 1st Bar Reactor Bank (3+1)x20 03/2023 25.23 1.59 0 345 0 ES 09/2024 12/2042 3.19 7/2022 IPCA Reinforcement and Improvement 5.30
SE Vitória - Installation of the 1st Bar Reactor Bank 345kV, (3+1)x20 Mvar 03/2023 50.74 2.27 0 345 0 ES 09/2024 12/2042 3.65 7/2022 IPCA Reinforcement and Improvement 12.88
SE Cachoeira Paulista - Replacement of single-phase reserve reactor RTR2 03/2023 4.73 0.09 0 500 0 SP 09/2027 12/2042 0.82 7/2022 IPCA Reinforcement and Improvement 0.00
SE Araraquara - Replacement of Single Phase Reserve Reactor RTR1, 500kV, 27MVAr 03/2023 5.14 0.12 0 500 0 SP 09/2027 12/2042 0.76 7/2022 IPCA Reinforcement and Improvement 1.58
SE Ivaiporã - Replacement of Single Phase Reserve Reactor RTR1, 750kV, 110MVAr 03/2023 9.30 0.00 0 750 0 PR 09/2025 12/2042 1.28 7/2022 IPCA Reinforcement and Improvement 3.17
SE Ivaiporã - Replacement of the LT Series Capacitor Bank for Foz do Iguaçu - C1 03/2023 139.38 0.00 0 750 0 PR 11/2026 12/2042 22.40 7/2022 IPCA Reinforcement and Improvement 24.38
SE Ivaiporã - Replacement of the LT Series Capacitor Bank for Foz do Iguaçu - C2 03/2023 139.38 0.00 0 750 0 PR 11/2026 12/2042 22.40 7/2022 IPCA Reinforcement and Improvement 24.38
SE Ivaiporã - Replacement of the LT Series Capacitor Bank for Foz do Iguaçu - C3 03/2023 139.38 0.00 0 750 0 PR 11/2026 12/2042 22.40 7/2022 IPCA Reinforcement and Improvement 24.38
Revitalization of the HVDC System 01/2023 0.00 0.00 0 600 0 PR 01/2026 12/2042 0.00 7/2022 IPCA Reinforcement and Improvement 0.00
SE USI Campos 03/2023 9.69 0.00 0 138/69 53 RJ 02/2026 12/2042 2.06 7/2022 IPCA Reinforcement and Improvement 6.69

 

224 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

VI.2.2.2 Special Purpose Entities
                         
VI.2.2.2.1 Transmission Lines
SPE Purpose
(From - To)
Enterprises
Eletrobras (%)
Investment
 Predicted
(R$ Million)
Planned Investment Reference Date Investment Realized
(R$ Million) 
Lines Extension (km) Voltage (kV) Beginning of
 Operation
Termination of the Concession RAP
(R$ Million)
RAP base date
cycle 2023/2023
Readjustment index
 of RAP
Transnorte Energia S.A.  Eng. Lechuga - Ecuador CD Eletronorte (49%) 2,253.42 Sep-22 370.71 784.0 500 - Jan-42 307.67 Dec-22 IPCA
Ecuador - Boa Vista CD 658.0 500 -

 

225 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

VI.2.2.2.2 Substations
SPE SE Enterprises
Eletrobras (%)
Investment
Predicted
(R$ Million)
Planned Investment Reference Date Investment Realized
(R$ Million) 
Transformation Capacity (MVA) Location (State) Start of Operation Termination of the Concession RAP
(R$ Million)
RAP base date
cycle 2023/203
Readjustment index
 of RAP
Transnorte Energia S.A. (1) Eng. Lechuga Eletronorte (49%) 491.0871996 Sep/2022 - - AM - Jan-42 49.29 Dec-22 IPCA
Ecuador - RR -
Boa Vista 800 May-15
Góias Transmissão S.A. SE Trindade Furnas (49%) 20.81470948 May/2021 11.38 150 GO May-23 Jul-40 3.11 Dec-22 IPCA
                         
                         
Note:                        
(1) The investment of the substations are considered in the SPE-LT-Implementation tab.
(2) According to ReA No. 9,997/2021, refers to the installation of the 1st 500 kV bar reactor - (3+1) x 50 Mvar.

 

226 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

VII. SPEs Data
                                               
VII.1 Operational data
                                               
VII.1.1 Generation
                                               
VII.1.1.1 Operational Assets and Generated Energy
SPE Power plant Source Enterprises
Eletrobras (%)
Percentage
Total
Eletrobras (%)
Location
(State)
Capacity
Installed
(MW)
Collateral
Physics
(MW)
Generated Energy  Beginning of
Operation
End of
 Concession
Partners Commercialized Energy Energy purchased for resale Energy Sold 
1Q23
(MWh)
2Q23
(MWh)
3Q23
(MWh)
4Q23
(MWh)
ACR ACL
(%)
1Q23 Buyer Type 1Q23
(%) Average Price (R$/ MWh) R$ million MWh R$ million MWh
V. de Santa Joana IX Energia Renováveis S.A. (1) Santa Joana IX Wind Holding (49%) 49.00% PI 29.60 15.80 11,817.9       Aug-15 Mar-49 Contour Global Holding Ltda (51.00%) 100.00 188.55 0.00 0.0 0 Eletrobras Companies ACR    
ACL    
Other ACR 2.2 11818
ACL    
V. de Santa Joana X Energia Renováveis S.A. (1) Santa Joana X  Wind Holding (49%) 49.00% PI 29.60 16.00 13,350.4       Jul-15 Mar-49 Contour Global Holding Ltda (51.00%) 100.00 188.55 0.00 0.0 0 Eletrobras Companies ACR    
ACL    
Other ACR 2.5 13350
ACL    
V. de Santa Joana XI Energia Renováveis S.A. (1) Santa Joana XI  Wind Holding (49%) 49.00% PI 29.60 16.00 12,435.2       Jul-15 Mar-49 Contour Global Holding Ltda (51.00%) 100.00 188.55 0.00 0.0 0 Eletrobras Companies ACR    
ACL    
Other ACR 2.3 12435
ACL    
V. de Santa Joana XII Energia Renováveis S.A.  (1) Santa Joana XII  Wind Holding (49%) 49.00% PI 28.90 16.90 16,172.8       Jul-15 Mar-49 Contour Global Holding Ltda (51.00%) 100.00 188.55 0.00 0.0 0 Eletrobras Companies ACR    
ACL    
Other ACR 3.0 16173
ACL    
V. de Santa Joana XIII Energia Renováveis S.A.  (1) Santa Joana XIII  Wind Holding (49%) 49.00% PI 29.60 16.00 13,065.1       Jul-15 Mar-49 Contour Global Holding Ltda (51.00%) 100.00 188.55 0.00 0.0 0 Eletrobras Companies ACR    
ACL    
Other ACR 2.5 13065
ACL    
V. de Santa Joana XV Energia Renováveis S.A.  (1) Santa Joana XV  Wind Holding (49%) 49.00% PI 28.90 16.20 14,485.3       Jul-15 Mar-49 Contour Global Holding Ltda (51.00%) 100.00 188.55 0.00 0.0 0 Eletrobras Companies ACR    
ACL    
Other ACR 2.7 14485
ACL    
V. de Santa Joana XVI Energia Renováveis S.A. (1) Santa Joana XVI  Wind Holding (49%) 49.00% PI 28.90 17.40 13,076.2       Jul-15 Mar-49 Contour Global Holding Ltda (51.00%) 100.00 188.55 0.00 0.0 0 Eletrobras Companies ACR    
ACL    
Other ACR 2.5 13076
ACL    
V. de Santa Joana I Energia Renováveis S.A. (2) Santa Joana I  Wind Holding (49%) 49.00% PI 28.90 13.20 14,319.5       Jan-16 Jun-49 Contour Global Holding Ltda (51.00%) 100.00 227.00 0.00 0.6 8,836 Eletrobras Companies ACR    
ACL    
Other ACR 3.3 14319
ACL    
V. de Santa Joana III Energia Renováveis S.A. (2) Santa Joana III  Wind Holding (49%) 49.00% PI 29.60 10.80 10,951.4       Mar-16 Jun-49 Contour Global Holding Ltda (51.00%) 100.00 226.35 0.00 1.1 15,580 Eletrobras Companies ACR    
ACL    
Other ACR 2.5 10951
ACL    
V. de Santa Joana IV Energia Renováveis S.A. (2) Santa Joana IV Wind Holding (49%) 49.00% PI 28.90 14.20 12,825.1       Jan-16 May-49 Contour Global Holding Ltda (51.00%) 100.00 226.38 0.00 0.3 3,731 Eletrobras Companies ACR    
ACL    
Other ACR 2.9 12825
ACL    
V. de Santa Joana V Energia Renováveis S.A. (2) Santa Joana V Wind Holding (49%) 49.00% PI 28.90 15.70 14,036.7       Jan-16 Jun-49 Contour Global Holding Ltda (51.00%) 100.00 226.62 0.00 0.2 3,361 Eletrobras Companies ACR    
ACL    
Other ACR 3.2 14037
ACL    
V. de Santa Joana VII Energia Renováveis S.A. (2) Santa Joana VII Wind Holding (49%) 49.00% PI 27.20 14.90 15,003.9       Jan-16 Jun-49 Contour Global Holding Ltda (51.00%) 100.00 226.66 0.00 0.0 0 Eletrobras Companies ACR    
ACL    
Other ACR 3.4 15004
ACL    
V. de Santo Augusto IV Energia Renováveis S.A. (2) Saint Augustus IV Wind Holding (49%) 49.00% PI 28.90 13.10 13,187.9       Feb-16 Jun-49 Contour Global Holding Ltda (51.00%) 100.00 224.31 0.00 0.2 3,329 Eletrobras Companies ACR    
ACL    
Other ACR 3.0 13188
ACL    
Eólica Cerro Chato IV S.A. (3) (5) Cerro Chato IV Wind CGT Eletrosul (100.00%) 100.00% RS 10.00 2.70 -       Mar-14 Mar-47 - 0.00 0.00 0.00 0.00 0.00 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 0.0 0
ACL 0.0 0
Eólica Cerro Chato V S.A. (3) (5)  Cerro Chato V Wind CGT Eletrosul (100.00%) 100.00% RS 12.00 3.40 -       May-14 Mar-47 - 0.00 0.00 0.00 0.00 0.00 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 0.0 0
ACL 0.0 0
Eólica Cerro Chato VI S.A. (3) (5) Cerro Chato VI Wind CGT Eletrosul (100.00%) 100.00% RS 24.00 10.40 -       Oct-14 Feb-47 - 0.00 0.00 0.00 0.00 0.00 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 0.0 0
ACL 0.0 0
Eólica Cerro dos Trindade S.A. (3) (5)  Cerro dos Trindade Wind CGT Eletrosul (100.00%) 100.00% RS 8.00 2.10 -       Nov-13 Mar-47 - 0.00 0.00 0.00 0.00 0.00 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 0.0 0
ACL 0.0 0
Eólica Ibirapuitã S.A. (3) Ibirapuitã I Wind CGT Eletrosul (100.00%) 100.00% RS 25.20 9.26 12,555.6       Aug-15 Feb-47 - 0.00 0.00 100% 0.193 2,799 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 0.0 0
ACL 2.9 16044
Rouar S.A. (10) Artilleros  Wind Holding (50.00%) 50.00% Uruguay (Colonia) 65.10 N/A 42,576.5       Apr-15 Dec-36 Administração Nacional de Usinas y Trasmisiones TPP(50.00%) N/A N/A N/A N/A N/A TPP 0.0 16.9 42576

 

227 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

Usina de Energia Eólica Caiçara I S.A. (4) Caiçara I Wind CHESF (49.00%) 49.00% RN 27.00 13.50 22,353.0       Dec-15 Jun-47     211.34   0.10 1121.70 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 6.2 29160
ACL 0.0 0
Usina de Energia Eólica Caiçara II S.A. (4) Caiçara II Wind CHESF (49.00%) 49.00% RN 18.00 9.60 15500.65       Dec-15 Jul-47     211.26   0.1 692.3 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 4.2 20088
ACL 0.1 692
Usina de Energia Eólica Junco I S.A. (4) Junco I Wind CHESF (49.00%) 49.00% RN 24.00 11.20 19,222.8       Dec-15 Jul-47     212.84   0.2 2,816.5 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 5.6 26136
ACL 0.0 0
Usina de Energia Eólica Junco II S.A. (4) Junco II Wind CHESF (49.00%) 49.00% RN 24.00 11.80 19391.97       Dec-15 Jul-47     211.76   0.1 860.6 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 5.2 24624
ACL 0.1 861
Baguari HPP Consortium HPP Baguari  Hydraulics Furnas (15.00%) 15.00% MG 140.00 81.90 84,634.14       Sep-09 Mar-46 Baguari I Geração de Energia Elétrica S.A. (51%)
Cemig Baguari Energia S.A. (34%)
100.00 291.38 0.00 0.0 0 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 25.1 86050
ACL 0.0 0
Chapecoense Geração S.A. HPP Foz do Chapecó Hydraulics Furnas (40.00%) 40.00% SC/RS 855.00 408.90 490,748.26       Oct-10 Aug-39 CPFL Geração de Energia S.A. - CPFL-G (51%)
Cia. Estadual de Geração de Energia Elétrica - CEEE-G (9%)
100.00 15.49 0.00 12.3 95,040 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 352.0 952402
ACL 0.0 0
Companhia Energética Sinop S.A. HPP Sinop Hydraulics Chesf (24.50%)
Eletronorte (24.50%)
49.00% MT 401.88 242.80 520,101.5       Sep-19 Jan-50 EDF TPP Norte Fluminense (51.00%)          0.97 190.09         0.03 11.0 43,200 Eletrobras Companies ACR 0.0 0
ACL 2.8 12,355
Other ACR 91.2 479,777
ACL 0.0 0
Empresa de Energia São Manoel S.A. HPP São Manoel  Hydraulics Furnas (33.333%) 33.33% PA 735.84 430.40 1,056,704.06       Dec-17 Dec-49 EDP - Energias do Brasil S.A. (33.334%)
China Three Gorges Brasil Energias Ltda. (33.333%)
77.66 145.43 22.34 0.0 0 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 91.1 641,632
ACL 26.2 165,240
Energetica Águas da Pedra S.A. HPP Dardanelos  Hydraulics Chesf (24.50%)
Eletronorte (24.50%)
49.00% MT 261.00 154.90 335,209.8       Aug-11 Nov-48 Neoenergia (51.00%) 100.00 276.61 100.00 4.75 13.04 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 92.5 334
ACL 0.0 0
Energia Sustentável do Brasil S.A. HPP Jirau  Hydraulics CHESF (20.00%)
CGT Eletrosul (20.00%)
40.00% RO 3750.00 2101.50 4,122,585.2       Sep-13 Dec-45 Mizah Energia (20%)
Engie (40%)
75% 167.08 25% 101.5 546,477 Eletrobras Companies ACR 0.0 0
ACL 106.4 395,091.2
Other ACR 592.7 3,547,259.0
ACL 188.5 762448
Enerpeixe S.A. HPP Peixe Angical  Hydraulics Furnas (40.00%) 40.00% TO 498.75 266.60 618,853.34       Jun-06 May-42 EDP - Energias do Brasil S.A. (60%) 0.00 123.21 100.00 0.0 0 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 0.0 0
ACL 70.0 567,936
Madeira Energia S.A. HPP Santo Antônio  Hydraulics Furnas (76.5065%) 80.77% RO 3568.30 2313.30 4,663,513.17       Mar-12 Oct-47 Fundo de Investimento em Participações Amazônia Energia (9,5244%)
Novonor Energia do Brasil S.A. (8.8577%)
SAAG Investimentos S.A. (5.1114%)
62.92 209.41 37.08 159.4 819,990 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 711.6 3834841
ACL 419.4 1565504
Norte Energia S.A. HPP B. Monte  Hydraulics CHESF (15.00%)
Eletronorte (34.98%)
49.98% PA 11233.10 4571.00 15,238,012.24       apr/16 Aug-45 Petros  (10.00%)
Belo Monte Part (10.00%)
Funcef (10.00%)
Other (20.02%)
70.00 160.91 30.00 6.7 71,203 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 1177.0 7322383
ACL 285.2 2293170
Retiro Baixo Energética S.A. HPP Retiro Baixo Hydraulics Furnas (49.00%) 49.00% MG 82.00 34.80 122,403.20       Mar-10 Mar-47 CEMIG Geração e Transmissão S.A. (49.90%)
Orteng Equipamentos e Sistemas Ltda. (1.10%)
100.00 289.79 0.00 0.0 0 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 23.9 82,616
ACL 0.0 0
Serra do Facão Energia S.A. (6) HPP Serra do Facão  Hydraulics Furnas (54.013%) 54.01% GO 212.58 174.40 105,184.63       Jul-10 Nov-40 Alcoa Alumínio S.A. (43.3294%)
DME Energética S.A. (13.6444%)
71.04 311.91 28.96 7.9 69,048 Eletrobras Companies ACR 0.0 0
ACL 0.0 0
Other ACR 85.2 274229
ACL 34.7 110160
Teles Pires Participações S.A. HPP Teles Pires  Hydraulics Furnas (24.49752%)
CGT Eletrosul (24.49752%)
49.00% PA/MT 1819.80 964.20 2,710,082.33       Nov-15 Jan-47 Neoenergia S.A. (51.005%) 58.81 129.37 39.54 12,234,240.0 64,800 Eletrobras Companies ACR 0.0 0
ACL 50,701,665.5 324,554
Other ACR 153,885,574.7 1,296,410
ACL 52,771,120.7 337,801
Tijoá Participações e Investimentos S.A. (7) HPP Três Irmãos Hydraulics Furnas (49.90%) 49.90% SP 807.50 206.70 841,385.59       Nov-93 Oct-44 Juno Participações e Investimentos S.A. (50.1%) N/A N/A N/A N/A N/A Eletrobras Companies ACR N/A N/A
ACL N/A N/A
Other ACR N/A N/A
ACL N/A N/A
Energia dos Ventos V S.A. (8) (9) São Januário Wind Furnas (100%) 100.00% EC 21.00 9.70 15,997.03       Jun-20 Jul-47 - 100.00 209.36 0.00 0.0 0 Eletrobras Companies ACR 0.0 0
Energia dos Ventos VI S.A.  (8) (9) Nossa Senhora de Fátima Wind Furnas (100%) 100.00% EC 30.00 13.60 20,725.99       Jun-20 Aug-47 ACL 0.0 0
Energia dos Ventos VII S.A.  (8) (9) Jandaia Wind Furnas (100%) 100.00% EC 27.00 14.10 19,551.88       May-20 Aug-47 Other ACR 21.6 103,032
Energia dos Ventos VIII S.A.  (8) (9) São Clemente Wind Furnas (100%) 100.00% EC 21.00 10.20 15,345.58       May-20 Jul-47 ACL 0.0 0
Energia dos Ventos IX S.A.  (8) (9) Jandaia I Wind Furnas (100%) 100.00% EC 24.00 10.60 17,848.88       May-20 Jul-47
                                               
(1) Chapada do Piauí I Holding S.A.
(2) Chapada do Piauí II Holding S.A.
(3) Livramento Holding S.A.
(4) Vamcruz I Participações S.A.
(5) Parks inoperative due to an accident occurred on 12/2014.
(6) The shareholding of Furnas in Serra do Facão Energia S.A. refers to the total shares (54.013%), which considers the common shares (43.0262%) also the preferred shares (100%).
(7) Tijoá operates the Três Irmãos HPP under Special Administration regime (Law No. 12.783/2013).
(8) Fortim Wind Complex.
(9) Furnas' participation in the SPE is through the holding Brasil Ventos Energia S.A. (BVE), in which Furnas' shareholding is 100%.
(10) Considered Exchange of 03/31/2023 of R$5.0804/ US$ (Bacen Ptax Sale)
* 1Q2023 Rouar generation includes estimated power not generated by transmission network operating restrictions (6 MWh)

 

228 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

VII.1.2 Transmission
                 
VII.1.2.1 Operational assets 
              REH 3067/2022
VII.1.2.1.1 Transmission Lines
SPE Purpose
(From-to)
Eletrobras Companies (%) Extension
(km)
Voltage
(kV)
Start of Operation   Termination of the Concession RAP on 12.31.2023
(R$ Million)
Readjustment Index
Belo Monte Transmissora de Energia SPE S.A. (1) Xingu - Strait C1 and C2 (Bipole 1) Eletronorte (24.5%)
Furnas (24.5%)
4,264.8 800 Dec-17 Jun-44 363.1 IPCA
Goiás Transmissão S.A. Rio Verde Norte – Trindade C1 and C2 Furnas (49%) 373.9 500 Nov-13 Jul-40 51.5 IPCA
Trindade – Xavantes C1 and C2 74.1 230 Nov-13
Trindade – Carajás C1 30.5 230 Dec-13
Interligação Elétrica do Madeira S.A. (1) Porto Velho Coletora - Araraquara 2 C1 and C2 (Bipole 1) Chesf (24.5%)
Furnas (24.5%)
4,859.0 600 Nov-13 Feb-39 358.6 IPCA
Interligação Elétrica Garanhuns S.A. L.Gonzaga - Garanhuns II Chesf (49%) 218.0 500 Nov-15 Dec-41 92.1 IPCA
Garanhuns II - Campina Grande III 194.0 500 Nov-15
Garanhuns II - Pau Ferro 209.0 500 Dec-15
Garanhuns II - Angelim I 12.0 230 Mar-16
Lago Azul Transmissão S.A. Barro Alto - Itapaci C2 Furnas (49.9%) 69.3 230 Sep-16 May-44 5.3 IPCA
MGE Transmissão S.A. Mosque - Mutum C1 Furnas (49%) 136.2 500 Jun-21 Jul-40 37.5 IPCA
Mutum - Viana 2 C1 118.6 500
Viana 2 – Viana C1 and C2 15.0 345
Mata de Santa Geneva Transmissão S.A. Itatiba – Batteries C1 Furnas (49.9%) 414.3 500 Mar-20 May-44 214.6 IPCA
Araraquara 2 - Itatiba C1 222.6 500 Mar-20 IPCA
Araraquara 2 - Fernão Dias C1 249.6 500 43954 IPCA
Paranaíba Transmissora de Energia S.A. Barriers II - Rio das Éguas C1 Furnas (24.5%) 239.1 500 Jan-17 May-43 154.1 IPCA
Rio das Éguas - Luziânia C1 368.0 500 Jul-16
Luziânia - Pirapora 2 C1 346.2 500 May-16
Sistema de Transmissão do Nordeste S.A. Teresina II -Sobral III CHESF (49.0%) 633.0 500 Jan-06 Feb-34 155.4 IGP-m
Teresina II -Fortaleza II Jan-06
Sobral III - Fortaleza II  Jan-06
Transenergia Renovável S.A. Chapadão – Jataí C1 and C2 Furnas (49%) 276.1 230 Dec-12 May-40 44.6 IPCA
Barra dos Coqueiros – Quirinópolis C1 51.3 230 Apr-11
Palmeiras – Edéia C1 (3) 58.6 230 Feb-12
Jataí – Mineiros C1 61.4 138 Dec-12
Mineiros - Morro Vermelho C1 46.9 138 Dec-12
Jataí - TPP Jataí C1 51.6 138 Dec-12
Jataí - TPP Água Emendada C1 32.6 138 Dec-12
Morro Vermelho - TPP Alto Taquari C1 30.1 138 Dec-12
Quirinópolis - TPP Quirinópolis C1 33.9 138 Apr-11
Quirinópolis - TPP Boa Vista C1 16.4 138 Apr-11
Edéia - TPP Tropical Bionenergia I and II C1 48.9 138 Nov-13
Transenergia São Paulo S.A. EL 138 kV Itatiba  Dist 1 to 8 Furnas (49%) 0.0 138 Aug-12 Nov-39 0.0 IPCA
Triângulo Mineiro Transmissora S.A. Marimbondo II - Assis C1 Furnas (49%) 298.4 500 Dec-16 Aug-43 41.0 IPCA
Vale do São Bartolomeu Transmissora de Energia S.A. Luziânia - Brasília Leste C1 Furnas (39%) 68.9 500 Feb-18 Oct-43 31.8 IPCA
Luziânia - Brasília Leste C2 67.0 500 Feb-18
Samambaia - Brasília Sul C3 14.0 345 May-16
Brasília Sul - Brasília Geral C3 13.5 230 Apr-17
Baguari HPP Consortium (2) HPP Baguari - Baguari C1 and C2  Furnas (15%) 1.2 230 Nov-09 Aug-41 N/A N/A
HPP Baguari - Baguari C3 and C4 1.4 230 May-10 Aug-41 N/A N/A
Chapecoense Geração S.A. (2) HPP Foz do Chapecó - Foz do Chapecó C1 and C2 Furnas (40%) 2.9 230 Oct-10 - N/A N/A
  HPP Foz do Chapecó - Foz do Chapecó C3 and C4   2.9 230 Oct-10 - N/A N/A
Empresa de Energia São Manoel S.A. (2) São Manoel HPP - Paranaíta C1 Furnas (33.333%) 40.0 500 Dec-17 Apr-49 N/A N/A
Enerpeixe S.A. (2) Peixe Angical – Peixe 2 C1 Furnas (40%) 20.0 500 Apr-08 May-42 N/A N/A
HPP Santo Antônio - Porto Velho Coletora C1  12.9 500 Mar-12 Oct-47 N/A N/A
HPP Santo Antônio - Porto Velho Coletora C2  13.6 500 Mar-12      
HPP Santo Antônio - Porto Velho Coletora C3 and C4 29.2 500 Jun-14      
  HPP Santo Antônio - Porto Velho C1 and C2   39.6 230 Jan-17      
Retiro Baixo Energética S.A. (2) Retiro Baixo – Curvelo 2 C1 Furnas (49%) 45.1 138 Mar-10 Aug-41 N/A N/A
Serra do Facão Energia S.A. (2) Serra do Facão – Catalão C1 and C2 Furnas (54.013%) 65.6 138 Jul-10 Nov-36 N/A N/A
Teles Pires - Paranaíta C1 and C2 18.6 500 Nov-15 Jan-47 N/A N/A
Brasil Ventos Energia S.A. - Fortim (2) Jandaia - Russas II C1 Furnas (100%) 68.8 230 Mar-20 Jul-47 N/A N/A
                 
(1) For direct current projects, the assumption of accounting for the network extension was changed in order to align with the assumptions adopted by the Ministry of Mines and Energy - MME. The network kilometer accounting considers the extension per pole and no longer per stretch as reported in previous quarters.
(2) There is no RAP because facilities are of restricted interest to the generating plant.
(3) ANEEL, through ORDER No. 2.714, of 09.27.2022,  granted partial provision to the claim of TER, for recognition of the entry into commercial operation of LT 230 kV Palmeiras-Edéia and its transmission functions, with the respective right to receive revenue, as of 02.17.2012.
(4) Increased extension due to the inclusion of 2 sections.

 

229 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

VII.1.2.1.2 Substations       REH 3067/2022
SPE Substation Eletrobras Companies (%) Transformation Capacity - MVA Status Start of  Operation Termination of the Concession RAP on 12.31.2022
(R$ Million)
Readjustment Index
Belo Monte Transmissora de Energia SPE S.A. 4,000 MW Converter Station at SE Xingu (2) Eletronorte (24.5%)
Furnas (24.5%)
4,752.0 Asset Dec-17 Jun-44 397.5 IPCA
792.0 Reserve
3,850 MW Converter Station at SE Estreito (2) 4,660.8 Asset Dec-17 Jun-44
776.8 Reserve
Caldas Novas Transmissão S.A. Corumbá (3) Furnas (49.9%) 150.0 Asset Aug-13 Jun-41 6.6 IPCA
Goiás Transmissão S.A. Trindade Furnas (49%) 1,600.0 Asset Nov-13 Jul-40 30.7 IPCA
133.3 Reserve
Interligação Elétrica do Madeira S.A. Rectifier Station at SE Coletora Porto Velho (Bipole 2) (2) Chesf (24.5%)
Furnas (24.5%)
3,832.0 Asset Jun-15 Feb-39 308.4 IPCA
638.7 Reserve
Inverter Station at SE Araraquara 2 (Bipole 2) (2) 3,608.0 Asset Jun-15 Feb-39
601.3 Reserve
Interligação Elétrica Garanhuns S.A. Garanhuns II Chesf (49%) 600.0 Asset Nov-15 Dec-41 35.1 IPCA
Garanhuns II 200.0 Reserve Nov-15
Pau Ferro 1,500.0 Asset Dec-15
Pau Ferro 250.0 Reserve Dec-15
Luziânia Niquelândia Transmissora S.A. (*) Luziânia Holding (49%) 450.0 Asset Jun-14 May-42 21.7 IPCA
Niquelândia 30.0 Asset Aug-15
Mata de Santa Geneva Transmissora S.A. (4) Santa Barbara (C.Estático)  (2) Furnas (49.9%) -   Apr-19 May-44 85.7 IPCA
Fernão Dias  3,600.0 Asset Nov-20 IPCA
400.0 Reserve
Static Compensator at SE Santa Bárbara D'Oeste (2)     Apr-19  
Static Compensator at SE Itatiba (2) -   Feb-20 IPCA
MGE Transmissão S.A. (4) Viana 2 (Enlargement) Furnas (49%) 900.0 Asset Jan-21 Jul-40 24.4 IPCA
Viana 2 900.0 Asset Aug-14 Jul-40 IPCA
300.0 Reserve
Paranaíba Transmissora de Energia S.A. Pirapora 2 (2) Furnas (24.5%) -   Jan-17 May-43 20.5 IPCA
Luziânia (2) -   Apr-17
Rio das Éguas (2) -   Apr-17
Barreiras II (2) -   May-17
Sistema de Transmissão do Nordeste S.A. Sobral III CHESF (49.0%) -   Jan-06 Feb-34 13.4 IGP-m
Fortaleza II -   Jan-06
Teresina II -   Jan-06
Transenergia Renovável S.A. Jataí Furnas (49%) 450.0 Asset Dec-12 May-40 33.4 IPCA
Quirinópolis 225.0 Asset Apr-11
Edéia 300.0   Feb-12
Mineiros -   Dec-12
Morro Vermelho - Asset Dec-12
Transenergia São Paulo S.A. (5) Itatiba Furnas (49%) 1,200.0 Asset Aug-12 Nov-39 27.5 IPCA
133.3 Reserve
Transnorte Energia S.A. Boa Vista (C.Estático) Eletronorte (49%) 150.0 Asset May-15 Jan-42 9.0 IPCA
Triângulo Mineiro Transmissora S.A. Marimbondo II  (2) Furnas (49%) -   Dec-16 Aug-43 10.0 IPCA
Assis (2) -  
Vale do São Bartolomeu Transmissora de Energia S.A. Brasília Leste Furnas (39%) 1,080.0 Asset Feb-18 Oct-43 15.4 IPCA
180.0 Reserve
Empresa de Energia São Manoel S.A. (1) HPP São Manoel  Furnas (33.333%) 780.0 Asset Dec-17 Apr-49 N/A N/A
390.0 Reserve
Enerpeixe S.A. (1) HPP Peixe Angical  Furnas (40%) 525.0 Asset Jun-06 May-42 N/A N/A
175.0 Reserve
Madeira Energia S.A. (1) HPP Santo Antônio  Furnas (76.5065%) 4,130.0 Asset Mar-12 Oct-47 N/A N/A
SAAG Investimentos S.A. (6) Furnas (83.42%) 1,570.0 Reserve        
Retiro Baixo Energética S.A. (1) HPP Retiro Baixo Furnas (49%) 100.0 Asset Mar-10 Aug-41 N/A N/A
Serra do Facão Energia S.A. (1) HPP Serra do Facão  Furnas (54.013%) 237.0 Asset Jul-10 Nov-36 N/A N/A
118.5 Reserve
Teles Pires Participações S.A. (1) HPP Teles Pires  Furnas (24.49752%) 2,025.0 Asset Nov-15 Jan-47    
Brasil Ventos Energia S.A. - Fortim (1) Jandaia Furnas (100%) 140.0 Asset Mar-20 Jul-47 N/A N/A
V. de Santa Joana IX Energia Renováveis S.A. (1) Se Chapada 2 Holding (49%) 240.0 Asset Aug-15 Mar-49 N/A N/A
V. de Santa Joana X Energia Renováveis S.A. (1) Holding (49%) Jul-15 Mar-49
V. de Santa Joana XI Energia Renováveis S.A. (1) Holding (49%) Jul-15 Mar-49
V. de Santa Joana XII Energia Renováveis S.A.  (1) Holding (49%) Jul-15 Mar-49
V. de Santa Joana XIII Energia Renováveis S.A.  (1) Holding (49%) Jul-15 Mar-49
V. de Santa Joana XV Energia Renováveis S.A.  (1) Holding (49%) Jul-15 Mar-49
V. de Santa Joana XVI Energia Renováveis S.A. (1) Holding (49%) Jul-15 Mar-49
V. de Santa Joana I Energia Renováveis S.A. (1) Se Chapada 3 Holding (49%) 240.0 Asset Jan-16 Jun-49 N/A N/A
V. de Santa Joana III Energia Renováveis S.A. (1) Holding (49%) Mar-16 Jun-49
V. de Santa Joana IV Energia Renováveis S.A. (1) Holding (49%) Jan-16 May-49
V. de Santa Joana V Energia Renováveis S.A. (1) Holding (49%) Jan-16 Jun-49
V. de Santa Joana VII Energia Renováveis S.A. (1) Holding (49%) Jan-16 Jun-49
V. de Santo Augusto IV Energia Renováveis S.A. (1) Holding (49%) Feb-16 Jun-49
Eólica Cerro Chato IV S.A.  (1) SE CERRO CHATO CGT Eletrosul (100.00%) 35 Reserve PLANTS OUT OF OPERATION Mar-47 N/A N/A
Eólica Cerro Chato V S.A.   (1) CGT Eletrosul (100.00%) Mar-47
Eólica Cerro Chato VI S.A.  (1) CGT Eletrosul (100.00%) Feb-47
Eólica Cerro dos Trindade S.A.   (1) CGT Eletrosul (100.00%) 35 Asset PLANT OUT OF OPERATION Mar-47
Eólica Ibirapuitã S.A. (1) CGT Eletrosul (100.00%) 35 Asset Aug-15 Feb-47
Companhia Energética Sinop S.A.(1) SE HPP Sinop - TE01 Chesf (24.50%)
Eletronorte (24.50%)
228 Asset Oct-19 Jan-50 N/A N/A
SE HPP Sinop - TE02 228 Asset Sep-19 Jan-50 N/A N/A
SE HPP Sinop - TE Reserva 228 Reserve - Jan-50 N/A N/A
Energetica Águas da Pedra S.A.(1) Elevator Transformer 13.8 - 230 kV Chesf (24.50%)
Eletronorte (24.50%)
67 Asset Aug-11 Oct-48 N/A N/A
Elevator Transformer 13.8 - 230 kV 67 Asset Sep-11 Oct-48 N/A N/A
Elevator Transformer 13.8 - 230 kV 67 Asset Sep-11 Oct-48 N/A N/A
Elevator Transformer 13.8 - 230 kV 67 Asset Sep-11 Oct-48 N/A N/A
Elevator Transformer 13.8 - 230 kV 33.5 Asset Aug-11 Oct-48 N/A N/A
Lowering transformer 230 - 34.5 kV 62.5 Asset Jul-05 Oct-48 N/A N/A
Lowering transformer 230 - 34.5 kV 14.2 Reserve Demobilized Oct-48 N/A N/A
Lowering transformer 34.5 - 13.8 kV 1.5 Reserve Not installed yet Oct-48 N/A N/A
Energia Sustentável do Brasil S.A.(1) SE JIRAU (13 x 340 MVA) CHESF (20.00%)
CGT Eletrosul (20.00%)
4,420 Asset Sep-13 12/7/2045 N/A N/A
SE JIRAU ( 1 x 340 MVA) 340 Reserve Sep-13 12/7/2045 N/A N/A
Norte Energia S.A.(1) SE Belo Monte (18 x 680 MVA) CHESF (15.00%)
Eletronorte (34.98%)
12340 Asset Apr-16 Aug-45 N/A N/A
SE Belo Monte (2 x 680 MVA) 1360 Reserve Apr-16 Aug-45 N/A N/A
SE Pimental (3 x 90MVA) 270 Asset Apr-16 Aug-45 N/A N/A
SE Pimental (1 x 90MVA) 90 Reserve Apr-16 Aug-45 N/A N/A
Usina de Energia Eólica Caiçara I S.A. (1) SE Amazonas CHESF (49.00%) 150.0 Asset Dec-15 Dec-35 N/A N/A
Asset Dec-15 Dec-35 N/A N/A
Usina de Energia Eólica Caiçara II S.A. (1) CHESF (49.00%) Asset Dec-15 Dec-35 N/A N/A
Asset Dec-15 Dec-35 N/A N/A
Usina de Energia Eólica Junco I S.A. (1) CHESF (49.00%) Asset Dec-15 Dec-35 N/A N/A
Asset Dec-15 Dec-35 N/A N/A
Usina de Energia Eólica Junco II S.A. (1) CHESF (49.00%) Asset Dec-15 Dec-35 N/A N/A
Asset Dec-15 Dec-35 N/A N/A
                 
(1) There is no RAP because facilities are of restricted interest to the generating plant.
(2) The accessed substation does not belong to the SPE. 
(3) The project is an expansion of SE HPP Corumbá I.
(4) Total RAP SE were considered because the expansions have already been completed.
(5) The SPE owns only substation, so we consider the Total RAP in SE.
(6) The SPE has as its corporate purpose the shareholding in Madeira Energia S.A., in which its percentage of interest is 5.1114%.
(*) NOTE: it is important to note that this value is not considering the PA of the cycle, according to Annex VI of REH 3067/2022
Note: Applied the new protocol for accounting the number of Substations and Transformation Capacity.

 

230 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

 VII.2 Loans and Financing – R$ million 
SPE Eletrobras Companies (%) Short Term - Up to 12 months (a) Long Term - After 12 months (b) Total (a+b) 
Loans Bonds Loans Bonds
 Belo Monte Transmissora de Energia S.A.   Eletronorte (24.5%)
Furnas (24.5%) 
  364.6  98.4 1,907.4 633.1  3,003.5
 Energia dos Ventos IX S.A.    Furnas (100%)  2.6   -  89.8   - 92.4
 Energia dos Ventos V S.A.    Furnas (100%)  2.3 -     81.7 -   84.0
 Energia dos Ventos VI S.A.    Furnas (100%)  3.4 -   114.5 -   117.9
 Energia dos Ventos VII S.A.    Furnas (100%)  3.5 -   102.8 -     106.3
 Energia dos Ventos VIII S.A.    Furnas (100%)  2.4 -     81.1 -   83.5
 Chapecoense Geração S.A.    Furnas (40.00%)  139.0 113.5   478.6   366.4   1,097.5
 Caldas Novas Transmissão S.A.   Furnas (49.9%)   1.0 -   3.8 -     4.8
 Chapada do Piauí I Holding S.A. (2)   Holding (49%)    16.2 5.0   200.6  48.3   270.1
 Chapada do Piauí II Holding S.A.    Holding (49%)    19.6 -   156.5 -     176.0
 Energetica Águas da Pedra S.A.   Chesf (24.50%)
Eletronorte (24.50%) 
 34.7 -   100.2 -     134.9
 Empresa de Energia São Manoel S.A.   Furnas (33.333%)   58.9  89.2 1,568.6   228.2   1,944.9
 Enerpeixe S.A.   Furnas (40.00%)  -     269.9 -     275.0  544.9
 Goiás Transmissão S.A.   Furnas (49%)   32.3 -   301.9 -    334.3
 Interligação Elétrica do Madeira S.A.   Chesf (24.5%)
Furnas (24.5%) 
160.8  49.0   908.0   274.3 1,392.1
 Interligação Elétrica Garanhuns S.A.   Chesf (49%)   28.6 -    93.5 -   122.1
 Energia Sustentável do Brasil S.A.   CHESF (20.00%)
CGT Eletrosul (20.00%) 
  638.5 -     9,800.8 -   10,439.3
 Luziânia Niquelândia Transmissora S.A.   Holding (49%)   1.4     14.1    15.6
 Madeira Energia S.A.   Furnas (43.056%)  145.6   564.4  13,656.8 5,491.6 19,858.3
 MGE Transmissão S.A.   Furnas (49%)    13.7 -     71.1 -   84.8
 Mata de Santa Geneva Transmissora S.A.   Furnas (49.9%)  -   100.4 -   1,708.2   1,808.6
 Norte Energia S.A.   CHESF (15.00%)
Eletronorte (34.98%) 
  406.2 8.3  13,751.8 412.6 14,578.8
 Paranaíba Transmissora de Energia S.A.   Furnas (24.5%)    43.1   19.7   377.6  83.8  524.2
 Retiro Baixo Energética S.A.   Furnas (49.00%)    13.8 -    24.2 -    38.1
 Rouar S.A. (1)   Holding (50.00%)    13.2 -   162.6 -     175.7
 Companhia Energética Sinop S.A.    Chesf (24.50%)
Eletronorte (24.50%) 
 20.7 6.3   557.8 186.5   771.3
 Transenergia Renovável S.A.   Furnas (49%)    10.9 -   101.8 -   112.7
 Triângulo Mineiro Transmissora S.A.   Furnas (49%)    19.6 -   4.0 -   23.6
 Teles Pires Participações S.A.   Furnas (24.4975%)
CGT Eletrosul (24.50%) 
187.1  73.8   2,099.0   434.9  2,794.7
 Transenergia São Paulo S.A.   Furnas (49%)  11.1 -   103.5 -   114.5
 Usina de Energia Eólica Caiçara I S.A.    CHESF (49.00%)  5.9 -    50.1 -  56.0
 Usina de Energia Eólica Caiçara II S.A.    CHESF (49.00%)  3.3 -   27.9 -   31.2
 Usina de Energia Eólica Junco I S.A.    CHESF (49.00%)  4.9 -    41.0 -  45.9
 Usina de Energia Eólica Junco II S.A.    CHESF (49.00%)  4.8 -   40.6 -  45.4
 Vale do São Bartolomeu Transmissora de Energia S.A.   Furnas (39%)    19.0 -   -   -    19.0
             
 Note:             
 (1) Considered Exchange of 03/31/2023 of 5.4066/US $ (Bacen Ptax Sale) 
 (2) The balance payable related to bonds is accounted for in the short term, due to the Company not reaching the indexes of the covenants, however the placement costs are accounted for in the long term. 

 

 

231 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

V.III Loans and Financing – R$ Million
                   
Eletrobras Parent Company
Parent company 2023 2024 2025 2026 2027 2028 2029 After 2029 Total (MN + ME)
By creditor 2,825.25 10,729.32 2,975.28 2,472.10 316.67 308.78 308.79 5,575.51 25,511.70
Other 2,825.25 10,729.32 2,975.28 2,472.10 316.67 308.78 308.79 5,575.51 25,511.70
CGT Eletrosul 2023 2024 2025 2026 2027 2028 2029 After 2029 Total (MN + ME)
By creditor 352.40 590.72 384.70 505.17 415.29 343.61 313.30 296.63 3,201.82
Eletrobras 148.60 190.28 194.08 196.17 75.28 69.50 71.88 296.63 1,242.41
Other 203.80 400.44 190.63 309.00 340.01 274.11 241.42 0.00 1,959.41
Chesf 2023 2024 2025 2026 2027 2028 2029 After 2029 Total (MN + ME)
By creditor 157.76 127.16 105.79 111.78 116.83 116.52 105.00 144.93 985.76
Other 157.76 127.16 105.79 111.78 116.83 116.52 105.00 144.93 985.76
Eletronorte 2023 2024 2025 2026 2027 2028 2029 After 2029 Total (MN + ME)
By creditor 1,050.52 1,099.48 434.94 167.49 135.99 68.53 74.44 884.13 3,915.52
Eletrobras 390.72 374.15 297.88 109.26 72.84 0.00 0.00 829.22 2,074.08
Other 659.80 725.33 137.06 58.22 63.15 68.53 74.44 54.91 1,841.44
Furnas 2023 2024 2025 2026 2027 2028 2029 After 2029 Total (MN + ME)
By creditor 1,926.70 2,394.62 1,427.91 1,902.75 1,670.20 1,612.66 1,321.69 15,906.12 28,162.64
Eletrobras 75.21 44.56 47.31 50.23 53.33 56.61 60.11 34.28 421.63
Other 1,851.49 2,350.06 1,380.60 1,852.52 1,616.87 1,556.04 1,261.58 15,871.84 27,741.01

 

232 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

I. Market Data
                         
I.1 Installed Capacity and Physical Guarantee – MW
Company Comprehensive Responsibility (a) Comprehensive Liability under Law 13.182/15 (b) Comprehensive Liability under O&M (c) Regime SPE (d) SPE under O&M (e) Regime 4Q22 Net Aggregation Total (a+b+c+d+e)
Installed Capacity Physical Warranty Installed Capacity Physical Warranty Installed Capacity Physical Warranty Installed Capacity Physical Warranty Installed Capacity Physical Warranty Installed Capacity Physical Warranty Installed Capacity Physical Warranty
Electronuclear                   1,990                 1,714.5                   -                    -                          -                      -                           -                 -                 -                     -                 -                     -                1,990                 1,714.5

 

 

233 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

II. Generation Data
                                             
II.1 Installed Capacity - MW
                                             
II.1.2 Generation Assets and Generated Energy 
                                             
                                             
                                             
Eletrobras Company Undertaking Location Source Start of Concession Beginning of
Operation
End of
Operation
Installed Capacity Physical Warranty Generated Energy (MWh) (1)   Type of
Fuel
Unit
Metric
Fuel used for electric power production
    1Q23 2Q23 3Q23 4Q23
(State) (MW) (Average MW) 1Q23 2Q23 3Q23 4Q23 Qty. R$ Million Qty. R$ Million Qty. R$ Million Qty. R$ Million
Eletronuclear Angra I (8) RJ Nuclear Jul-70 Jan-85 Dec-24 640.00 509.80            1,282,391  NA   NA  NA Uranium kg 33,951 51.46 NA NA NA NA NA NA
Angra II (8) RJ Nuclear May-74 Sep-00 Aug-40 1,350.00 1,204.70           2,308,173  NA   NA  NA Uranium kg 82,262 79.10 NA NA NA NA NA NA
               
(8) The CNAAA Plants do not operate under the concession regime. They are operating under the authorization regime. Angra I has an operating license given by MME Ordinance No. 416 of 07/13/1970 and Angra 2 has an operating license given by Exp. Mot. MME No. 300 of 05/28/1974.
(1) Generated Energy referenced to SIN Center of Gravity
                                             
                                             
II.1.2.1.2 Generation Losses - %
Eletrobras Companies 1Q23 2Q23 3Q23 4Q23                            
In the quarter Accumulated In the quarter Accumulated In the quarter Accumulated In the quarter Accumulated                            
Electronuclear 5.74 5.74 NA NA NA NA NA NA                            
                                             
Note: Losses in Generation, meets the formula: (Gross-Net (500kV))/Grossx100

 

 

234 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

 

ACR Contracts - Availability
                     
Eletrobras Company Auction
(if Bilateral Contract Regulated inform client)
Compromised Plants Source Start Date End Date Submarket Current Volume
(MWaverage)
Updated Fixed Revenue
(R$ thousand/year)
Accounting Position
(Procurement
/Supply)
Indexed
Eletronuclear Nuclear Power Quotas Angra I and Angra II NUCLEAR NA NA  SE/CO  1,572.70 4,662,203.62 Procurement NA

 

235 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

II.1.3.Sold Energy
                   
II.1.3.1 Energy Sold by enterprises not renewed by Law 12.783/13 and Law 13.182/15
Eletrobras Company Buyer 1Q23 2Q23 3Q23 4Q23
R$ Million MWh R$ Million MWh R$ Million MWh R$ Million MWh
Eletronuclear Eletrobras System                
Other 1,165,550.90 3,389,454 NA NA NA NA NA NA
                   
Note: Amount in MWh, corresponding to the Physical Guarantee at the Center of Gravity of the Plants, Angra 1 and Angra 2

 

236 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

II.1.5 Average fee – R$/MWh
           
II.1.5.1 Projects not renewed under Law No. 12.783/13
           
Eletrobras Company 1Q23 2Q23 3Q23 4Q23 2023
Electronuclear (4) 343.88       343.88
 
     
(4) Defined fee considering the Fixed Revenue of Eletronuclear by the contracted energy.
           
Note: Estimated rates considering the ratio between the Total Revenue in the period and the Physical Guarantee in the period (MWh).

 

237 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

Investments                       
                       
                       
Investment                       
Generation 1Q23 2Q23 3Q23 4Q23 Total Realized Budgeted until Sep Budgeted PDNG 1Q/23 Budgeted PDNG 2Q/23 Budgeted PDNG 3Q/23 Budgeted PDNG 4Q/23 Budgeted PDNG 2023
 Eletronuclear                               185,183,246.9                                   -                                         -                        -                              185,183,246.9                                           -                          302,945,247.0                                             -                                            -                                           -                            302,945,247.0
                       
                       
Generation - Deployment 1Q23 2Q23 3Q23 4Q23 Total Realized Budgeted until Sep Budgeted PDNG 1Q/23 Budgeted PDNG 2Q/23 Budgeted PDNG 3Q/23 Budgeted PDNG 4Q/23 Budgeted PDNG 2023
 Eletronuclear                                99,421,426.7                                   -                                         -                        -                                99,421,426.7                           139,123,121.0                                             -                                            -                                           -                              139,123,121.0
                       
                   
Generation - Expansion 1Q23 2Q23 3Q23 4Q23 Total Realized Budgeted until Sep Budgeted PDNG 1Q/23 Budgeted PDNG 2Q/23 Budgeted PDNG 3Q/23 Budgeted PDNG 4Q/23 Budgeted PDNG 2023
 Eletronuclear                                                 -                                      -                                         -                        -                                                 -                                               -                                                -                                            -                                           -                                               -   
                       
Generation - Maintenance 1Q23 2Q23 3Q23 4Q23 Total Realized Budgeted until Sep Budgeted PDNG 1Q/23 Budgeted PDNG 2Q/23 Budgeted PDNG 3Q/23 Budgeted PDNG 4Q/23 Budgeted PDNG 2023
 Eletronuclear                                85,761,820.2                                   -                                         -                        -                                85,761,820.2                          163,822,126.0                                             -                                            -                                           -                             163,822,126.0
                       
                                                    -   
                       
Other* 1Q23 2Q23 3Q23 4Q23 Total Realized Budgeted until Sep Budgeted PDNG 1Q/23 Budgeted PDNG 2Q/23 Budgeted PDNG 3Q/23 Budgeted PDNG 4Q/23 Budgeted PDNG 2023
 Eletronuclear                                  7,898,444.7                                   -                                         -                        -                                 7,898,444.7                           10,643,590.0                                             -                                            -                                           -                              10,643,590.0
Company Investment 2023 Budgeted until Sep Budgeted PDNG 1Q/23 Budgeted PDNG 2Q/23 Budgeted PDNG 3Q/23 Budgeted PDNG 4Q/23 Budgeted PDNG 2023
 1Q23   2Q23   3Q23   4Q23  Total
 Eletronuclear                                193,081,691.6                                   -                                         -                        -                               193,081,691.6                                           -                          313,588,837.0                                             -                                            -                                           -                            313,588,837.0
                       
Total                      193,081,692                         -                               -                  -                       193,081,692                               -                    313,588,837                                 -                                 -                                -                     313,588,837

 

238 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

VI.2 Investments in new projects
                               
VI.2.1 Generation
                               
VI.2.1.1 Integral Responsibility
Eletrobras Company Power plant Source Location
(State)
Investment (R$ Million) Installed Capacity (MW) Physical Guarantee (MW) Start of Concession Start of Operation Beginning of Construction Termination of the Concession Physical Schedule of Work Performed (%) Contract Type (Availability or Quantity) Estimated annual revenue (R$ million)
Total Predicted Investment Planned Total Investment Reference Date Investment Realized
Electronuclear (2) (3) (4) (5) (14) Angra 3 Nuclear RJ              29,243.70 Sep-21                  10,852.20 1,405.00 1282.7 (5) (4) 07/01/2028 (14) Nov-09 Jun-68 67.00% ND ND
     
(2) The direct cost budget approved by the Executive Board, according to RDE 1687.005/23, of 01/03/2023, is R$29,243.7 million, of which R$10,654.1 million has already been realized.  The indirect costs added to the enterprise are those legally allowed, such as: internal engineering, administration, capitalized financial charges, etc. Law 14.120, of March 1, 2021 - Federal Official Gazette of 03.02.2021, established that the sale price of the energy to be generated by the Angra 3 Plant will result from the study carried out by BNDES, which must be approved by CNPE, and must cumulatively consider the economic and financial viability of the enterprise and its financing under market conditions, observing the principles of reasonableness and fee moderation.  
(3) There is still no operating license for Angra 3. It is considered 40 years from Jul/28 by analogy with Angra 1 and 2.
(4) The CNAAA Plants do not operate under the concession regime. They are operating under the authorization regime. Angra 3 is licensed for initial exploration given by Decree No. 75.870 of 06/13/1975 and current by DNAEE Ordinance No. 315 of 07/31/1997.
(5) Ordinance  No. 1.118/SPE/MME, of December 30, 2021, of the Energy Planning and Decommissioning Secretariat of the Ministry of Mines and Energy defined the Angra 3 Power Plant's physical energy guarantee at 1,282.7 average MW.
(14) According to RDE No. 1687.005/23, of January 3, a new date for the start of operation of Angra 3 was approved based on the studies now underway by BNDES to make the Angra 3 enterprise viable. 

 

 

239 

 

DFR - Investor Relations Superintendence

Marketletter - 1Q23

Annex - Operating Information of Subsidiaries 

 

V.III Loans and Financing – R$ Million
                   
 
Electronuclear 2023 2024 2025 2026 2027 2028 2029 After 2029 Total (MN + ME)
By creditor              307.52           401.84           420.67           435.96             435.11            437.25            456.74            4,144.58             7,039.67
Furnas                        31.22                    41.62                    41.62                    41.62                     41.62                     41.62                    34.68                             -                           274.01
Other                      276.30                  360.21                 379.05                 394.34                  393.49                  395.63                  422.06                   4,144.58                    6,765.66

 

 

 

 

 

 

 

240 

 

 

 

SIGNATURE

 

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

Date: May 18, 2023

CENTRAIS ELÉTRICAS BRASILEIRAS S.A. - ELETROBRÁS
     
By:

/S/ Elvira Baracuhy Cavalcanti Presta


 
 

Elvira Baracuhy Cavalcanti Presta

Vice President of Finance and Investor Relations

 

 

 

FORWARD-LOOKING STATEMENTS

 

This press release may contain forward-looking statements. These statements are statements that are not historical facts, and are based on management's current view and estimates offuture economic circumstances, industry conditions, company performance and financial results. The words "anticipates", "believes", "estimates", "expects", "plans" and similar expressions, as they relate to the company, are intended to identify forward-looking statements. Statements regarding the declaration or payment of dividends, the implementation of principal operating and financing strategies and capital expenditure plans, the direction of future operations and the factors or trends affecting financial condition, liquidity or results of operations are examples of forward-looking statements. Such statements reflect the current views of management and are subject to a number of risks and uncertainties. There is no guarantee that the expected events, trends or results will actually occur. The statements are based on many assumptions and factors, including general economic and market conditions, industry conditions, and operating factors. Any changes in such assumptions or factors could cause actual results to differ materially from current expectations.