FALSE2021--12-31110000000001000000000.0113838789010.010001770561☐☒Accelerated Filer☐☐YesYes83-178060861245.5☒NoFYNo0.18September 19, 2021☒16764537312025-03-312024-03-312023-03-310.21 0001770561 2021-01-01 2021-12-31 0001770561 srt:MinimumMember 2021-01-01 2021-12-31 0001770561 srt:MaximumMember 2021-01-01 2021-12-31 0001770561 2020-01-01 2020-12-31 0001770561 2020-12-31 0001770561 us-gaap:ConstructionInProgressMember 2020-12-31 0001770561 2021-12-31 0001770561 c561:CoalLeasesContractLiabilityMember 2020-12-31 0001770561 c561:MiningPermitsMember c561:LoganSegmentMember 2020-12-31 0001770561 c561:StanwellReservedAreaDeferredConsiderationMember 2020-12-31 0001770561 c561:MiningPermitsMember c561:BuchananSegmentMember 2020-12-31 0001770561 c561:PlantMachineryMiningEquipmentAndTransportationVehiclesMember 2020-12-31 0001770561 us-gaap:LandMember 2020-12-31 0001770561 us-gaap:MiningPropertiesAndMineralRightsMember 2020-12-31 0001770561 c561:StanwellBelowMarketCoalSupplyAgreementMember 2020-12-31 0001770561 c561:StanwellReservedAreaDeferredConsiderationMember 2018-08-14 0001770561 us-gaap:MineDevelopmentMember 2020-12-31 0001770561 us-gaap:CorporateNonSegmentMember 2020-12-31 0001770561 us-gaap:AssetRetirementObligationCostsMember 2020-12-31 0001770561 us-gaap:BuildingAndBuildingImprovementsMember 2020-12-31 0001770561 c561:BuchananMember 2016-03-31 0001770561 us-gaap:OfficeEquipmentMember 2020-12-31 0001770561 c561:BuchananMember 2020-12-31 0001770561 us-gaap:AccumulatedTranslationAdjustmentMember 2020-12-31 0001770561 us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember 2020-12-31 0001770561 c561:AccumulatedGainLossNetCashFlowForeignCurrencyHedgeMember 2020-12-31 0001770561 c561:MiningPermitsMember c561:LoganSegmentMember 2021-01-01 2021-12-31 0001770561 c561:MiningPermitsMember c561:BuchananSegmentMember 2021-01-01 2021-12-31 0001770561 c561:MiningPermitsMember c561:LoganSegmentMember 2020-01-01 2020-12-31 0001770561 c561:MiningPermitsMember c561:BuchananSegmentMember 2020-01-01 2020-12-31 0001770561 2019-01-01 2019-12-31 0001770561 us-gaap:OperatingSegmentsMember 2020-01-01 2020-12-31 0001770561 us-gaap:OperatingSegmentsMember 2021-01-01 2021-12-31 0001770561 c561:CoalRevenueMember 2020-01-01 2020-12-31 0001770561 c561:CoalRevenueMember 2019-01-01 2019-12-31 0001770561 c561:CoalRevenueFromRelatedPartiesMember 2020-01-01 2020-12-31 0001770561 c561:CoalRevenueFromRelatedPartiesMember 2019-01-01 2019-12-31 0001770561 2018-12-31 0001770561 us-gaap:AccumulatedTranslationAdjustmentMember 2020-01-01 2020-12-31 0001770561 us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember 2020-01-01 2020-12-31 0001770561 c561:AccumulatedGainLossNetCashFlowForeignCurrencyHedgeMember 2020-01-01 2020-12-31 0001770561 us-gaap:AccumulatedTranslationAdjustmentMember 2019-12-31 0001770561 us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember 2019-12-31 0001770561 c561:AccumulatedGainLossNetCashFlowForeignCurrencyHedgeMember 2019-12-31 0001770561 2019-12-31 0001770561 c561:JepMiningLlcMember c561:GreenbrierMember 2021-01-01 2021-12-31 0001770561 c561:JepMiningLlcMember c561:SyrEnergyPartnersLpMember 2021-01-01 2021-12-31 0001770561 c561:JepMiningLlcMember 2020-12-31 0001770561 c561:CoronadoGroupLlcMember 2018-10-23 0001770561 c561:CoronadoGroupLlcMember 2016-06-30 0001770561 c561:CoronadoGroupLlcMember 2021-12-31 0001770561 c561:NonMarketCoalSupplyAgreementMember 2020-12-31 0001770561 c561:NonMarketCoalSupplyAgreementMember 2020-01-01 2020-12-31 0001770561 c561:NonMarketCoalSupplyAgreementMember 2021-01-01 2021-12-31 0001770561 us-gaap:WorkersCompensationInsuranceMember 2021-05-01 0001770561 us-gaap:WorkersCompensationInsuranceMember 2020-05-01 0001770561 us-gaap:WorkersCompensationInsuranceMember 2020-01-01 2020-12-31 0001770561 us-gaap:WorkersCompensationInsuranceMember 2019-01-01 2019-12-31 0001770561 us-gaap:WorkersCompensationInsuranceMember 2020-12-31 0001770561 srt:MinimumMember us-gaap:SecuredDebtMember 2021-01-01 2021-12-31 0001770561 srt:MinimumMember us-gaap:UnsecuredDebtMember 2021-01-01 2021-12-31 0001770561 us-gaap:SecuredDebtMember srt:MaximumMember 2021-01-01 2021-12-31 0001770561 us-gaap:UnsecuredDebtMember srt:MaximumMember 2021-01-01 2021-12-31 0001770561 us-gaap:SecuredDebtMember 2020-01-01 2020-12-31 0001770561 us-gaap:SecuredDebtMember srt:MaximumMember 2020-01-01 2020-12-31 0001770561 srt:MinimumMember us-gaap:SecuredDebtMember 2020-01-01 2020-12-31 0001770561 us-gaap:UnsecuredDebtMember srt:MaximumMember 2020-01-01 2020-12-31 0001770561 srt:MinimumMember us-gaap:UnsecuredDebtMember 2020-01-01 2020-12-31 0001770561 us-gaap:SecuredDebtMember srt:MaximumMember 2020-12-31 0001770561 us-gaap:UnsecuredDebtMember srt:MaximumMember 2020-12-31 0001770561 c561:DefinedContributionPlan401KMember 2021-01-01 2021-12-31 0001770561 srt:MaximumMember c561:DefinedContributionPlan401KMember 2021-01-01 2021-12-31 0001770561 srt:MaximumMember c561:BuchananPlanMember 2021-01-01 2021-12-31 0001770561 srt:MaximumMember c561:BuchananPlanMember 2020-01-01 2020-12-31 0001770561 srt:MaximumMember c561:BuchananPlanMember 2019-01-01 2019-12-31 0001770561 c561:EquityIncentivePlan2018Member 2020-01-01 2020-12-31 0001770561 c561:EquityIncentivePlan2018Member 2019-01-01 2019-12-31 0001770561 c561:EquityIncentivePlan2018Member 2020-12-31 0001770561 c561:EquityIncentivePlan2018Member 2019-08-05 0001770561 us-gaap:PerformanceSharesMember 2020-01-01 2020-12-31 0001770561 us-gaap:PerformanceSharesMember 2020-12-31 0001770561 srt:MinimumMember c561:MachineryMiningEquipmentAndTransportationVehiclesMember 2021-01-01 2021-12-31 0001770561 srt:MaximumMember c561:MachineryMiningEquipmentAndTransportationVehiclesMember 2021-01-01 2021-12-31 0001770561 srt:MinimumMember us-gaap:OfficeEquipmentMember 2021-01-01 2021-12-31 0001770561 srt:MaximumMember us-gaap:OfficeEquipmentMember 2021-01-01 2021-12-31 0001770561 srt:MaximumMember us-gaap:LandAndBuildingMember 2021-01-01 2021-12-31 0001770561 srt:MinimumMember us-gaap:LandAndBuildingMember 2021-01-01 2021-12-31 0001770561 c561:ChessDepositaryInterestsMember 2018-10-23 2018-10-23 0001770561 us-gaap:OperatingSegmentsMember 2019-01-01 2019-12-31 0001770561 us-gaap:WorkersCompensationInsuranceMember 2021-01-01 2021-12-31 0001770561 c561:CoronadoGroupLlcMember 2020-12-31 0001770561 2021-06-30 0001770561 2019-09-20 2019-09-20 0001770561 c561:ChessDepositaryInterestsMember 2019-09-20 0001770561 c561:ChessDepositaryInterestsMember 2018-10-23 0001770561 c561:EmgGroupMember 2021-01-01 2021-12-31 0001770561 c561:CoronadoGroupLlcMember 2021-01-01 2021-12-31 0001770561 c561:UsDollarCoalSalesInAustraliaMember 2021-01-01 2021-12-31 0001770561 c561:UsDollarCoalSalesInAustraliaMember 2020-01-01 2020-12-31 0001770561 c561:UsDollarCoalSalesInAustraliaMember 2019-01-01 2019-12-31 0001770561 2019-10-23 2019-12-31 0001770561 us-gaap:CommonStockMember 2019-09-20 0001770561 c561:CoalRevenueFromRelatedPartiesMember 2021-01-01 2021-12-31 0001770561 c561:CoalRevenueMember 2021-01-01 2021-12-31 0001770561 c561:BuchananAndLoganSegmentMember 2021-01-01 2021-12-31 0001770561 c561:GreenbrierSegmentMember 2021-01-01 2021-12-31 0001770561 c561:PangburnShanerFallowfieldAndRusselCountySegmentMember 2021-01-01 2021-12-31 0001770561 c561:MetallurgicalCoalMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2021-01-01 2021-12-31 0001770561 c561:MetallurgicalCoalMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2021-01-01 2021-12-31 0001770561 c561:ThermalCoalMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2021-01-01 2021-12-31 0001770561 c561:ThermalCoalMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2021-01-01 2021-12-31 0001770561 c561:TotalCoalRevenueMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2021-01-01 2021-12-31 0001770561 c561:TotalCoalRevenueMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2021-01-01 2021-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2021-01-01 2021-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2021-01-01 2021-12-31 0001770561 c561:MetallurgicalCoalMember 2021-01-01 2021-12-31 0001770561 c561:ThermalCoalMember 2021-01-01 2021-12-31 0001770561 c561:TotalCoalRevenueMember 2021-01-01 2021-12-31 0001770561 c561:MetallurgicalCoalMember 2020-01-01 2020-12-31 0001770561 c561:ThermalCoalMember 2020-01-01 2020-12-31 0001770561 c561:TotalCoalRevenueMember 2020-01-01 2020-12-31 0001770561 c561:MetallurgicalCoalMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2020-01-01 2020-12-31 0001770561 c561:MetallurgicalCoalMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2020-01-01 2020-12-31 0001770561 c561:ThermalCoalMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2020-01-01 2020-12-31 0001770561 c561:ThermalCoalMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2020-01-01 2020-12-31 0001770561 c561:TotalCoalRevenueMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2020-01-01 2020-12-31 0001770561 c561:TotalCoalRevenueMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2020-01-01 2020-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2020-01-01 2020-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2020-01-01 2020-12-31 0001770561 c561:MetallurgicalCoalMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2019-01-01 2019-12-31 0001770561 c561:MetallurgicalCoalMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2019-01-01 2019-12-31 0001770561 c561:ThermalCoalMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2019-01-01 2019-12-31 0001770561 c561:ThermalCoalMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2019-01-01 2019-12-31 0001770561 c561:TotalCoalRevenueMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2019-01-01 2019-12-31 0001770561 c561:TotalCoalRevenueMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2019-01-01 2019-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2019-01-01 2019-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2019-01-01 2019-12-31 0001770561 c561:MetallurgicalCoalMember 2019-01-01 2019-12-31 0001770561 c561:ThermalCoalMember 2019-01-01 2019-12-31 0001770561 c561:TotalCoalRevenueMember 2019-01-01 2019-12-31 0001770561 c561:ChessDepositaryInterestsMember c561:PlacementAndRetailmentEntitlementOfferMember 2020-12-31 0001770561 c561:ChessDepositaryInterestsMember c561:CoronadoGroupLlcMember 2020-12-31 0001770561 c561:ChessDepositaryInterestsMember c561:CoronadoGroupLlcMember c561:NewInvestorsMember 2020-12-31 0001770561 us-gaap:CommonStockMember c561:CoronadoGroupLlcMember c561:NewInvestorsMember 2020-12-31 0001770561 us-gaap:SecuredDebtMember 2021-01-01 2021-12-31 0001770561 us-gaap:PerformanceSharesMember 2021-01-01 2021-12-31 0001770561 us-gaap:PerformanceSharesMember 2018-12-31 0001770561 us-gaap:PerformanceSharesMember 2019-01-01 2019-12-31 0001770561 c561:EquityIncentivePlan2018Member 2021-01-01 2021-12-31 0001770561 c561:EquityIncentivePlan2018Member c561:ChessDepositaryInterestsMember 2021-01-01 2021-12-31 0001770561 c561:AwardedIn2018Member us-gaap:EmployeeStockOptionMember 2021-01-01 2021-12-31 0001770561 us-gaap:PerformanceSharesMember c561:AwardedIn2020Member 2021-01-01 2021-12-31 0001770561 c561:AwardedIn2018Member us-gaap:PerformanceSharesMember 2021-01-01 2021-12-31 0001770561 c561:ReleaseOfAuditedFullYearFinancialResultsMember c561:ShortTermIncentivePlanMember 2021-01-01 2021-12-31 0001770561 c561:ShortTermIncentivePlanMember c561:DeferredFor12MonthsMember 2021-01-01 2021-12-31 0001770561 us-gaap:RestrictedStockUnitsRSUMember c561:TwentyNineteenShortTermIncentivePlanMember 2021-01-01 2021-12-31 0001770561 us-gaap:RestrictedStockUnitsRSUMember c561:ChessDepositaryInterestsMember c561:TwentyNineteenShortTermIncentivePlanMember 2020-12-31 0001770561 us-gaap:SecuredDebtMember 2021-12-31 0001770561 us-gaap:UnsecuredDebtMember 2021-12-31 0001770561 us-gaap:StandbyLettersOfCreditMember 2020-12-31 0001770561 c561:CashCollateralMember 2020-12-31 0001770561 c561:AwardedIn2020Member us-gaap:EmployeeStockOptionMember 2021-12-31 0001770561 us-gaap:PerformanceSharesMember c561:AwardedIn2020Member 2021-12-31 0001770561 c561:AwardedIn2018Member us-gaap:EmployeeStockOptionMember 2021-12-31 0001770561 c561:AwardedIn2018Member us-gaap:PerformanceSharesMember 2021-12-31 0001770561 c561:AwardedIn2020Member 2021-01-01 2021-12-31 0001770561 c561:AwardedIn2018Member 2021-01-01 2021-12-31 0001770561 c561:ScorecardCriteriaMember us-gaap:PerformanceSharesMember c561:AwardedIn2020Member 2021-01-01 2021-12-31 0001770561 c561:EquityIncentivePlan2018Member c561:AwardedIn2018Member c561:ScorecardCriteriaMember us-gaap:PerformanceSharesMember 2021-01-01 2021-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2020-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2020-12-31 0001770561 us-gaap:OperatingSegmentsMember 2020-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2019-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2019-12-31 0001770561 us-gaap:OperatingSegmentsMember 2019-12-31 0001770561 us-gaap:CorporateNonSegmentMember 2021-01-01 2021-12-31 0001770561 us-gaap:CorporateNonSegmentMember 2020-01-01 2020-12-31 0001770561 us-gaap:CorporateNonSegmentMember 2019-01-01 2019-12-31 0001770561 us-gaap:CorporateNonSegmentMember 2019-12-31 0001770561 us-gaap:FairValueMeasurementsRecurringMember us-gaap:FairValueInputsLevel2Member 2020-12-31 0001770561 us-gaap:FairValueMeasurementsRecurringMember 2020-12-31 0001770561 us-gaap:FairValueInputsLevel3Member us-gaap:FairValueMeasurementsRecurringMember 2020-12-31 0001770561 us-gaap:AustralianTaxationOfficeMember 2020-12-31 0001770561 c561:ForwardFuelContractsMember 2021-01-01 2021-12-31 0001770561 c561:ForwardFuelContractsMember 2020-01-01 2020-12-31 0001770561 c561:TsrCriteriaMember us-gaap:PerformanceSharesMember c561:AwardedIn2020Member 2021-01-01 2021-12-31 0001770561 c561:TsrCriteriaMember c561:AwardedIn2018Member us-gaap:PerformanceSharesMember 2021-01-01 2021-12-31 0001770561 c561:TsrCriteriaMember c561:AwardedIn2018Member us-gaap:EmployeeStockOptionMember 2021-01-01 2021-12-31 0001770561 us-gaap:WorkersCompensationInsuranceMember srt:ScenarioForecastMember 2022-05-01 0001770561 us-gaap:CommonStockMember 2018-12-31 0001770561 us-gaap:PreferredStockMember 2018-12-31 0001770561 us-gaap:AdditionalPaidInCapitalMember 2018-12-31 0001770561 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2018-12-31 0001770561 us-gaap:RetainedEarningsMember 2018-12-31 0001770561 us-gaap:NoncontrollingInterestMember 2018-12-31 0001770561 us-gaap:PreferredStockMember 2019-01-01 2019-12-31 0001770561 us-gaap:AdditionalPaidInCapitalMember 2019-01-01 2019-12-31 0001770561 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2019-01-01 2019-12-31 0001770561 us-gaap:RetainedEarningsMember 2019-01-01 2019-12-31 0001770561 us-gaap:NoncontrollingInterestMember 2019-01-01 2019-12-31 0001770561 us-gaap:PreferredStockMember 2019-12-31 0001770561 us-gaap:AdditionalPaidInCapitalMember 2019-12-31 0001770561 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2019-12-31 0001770561 us-gaap:RetainedEarningsMember 2019-12-31 0001770561 us-gaap:NoncontrollingInterestMember 2019-12-31 0001770561 us-gaap:CommonStockMember 2019-01-01 2019-12-31 0001770561 us-gaap:CommonStockMember 2019-12-31 0001770561 us-gaap:PreferredStockMember 2020-01-01 2020-12-31 0001770561 us-gaap:AdditionalPaidInCapitalMember 2020-01-01 2020-12-31 0001770561 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2020-01-01 2020-12-31 0001770561 us-gaap:RetainedEarningsMember 2020-01-01 2020-12-31 0001770561 us-gaap:NoncontrollingInterestMember 2020-01-01 2020-12-31 0001770561 us-gaap:CommonStockMember 2020-01-01 2020-12-31 0001770561 us-gaap:CommonStockMember 2020-12-31 0001770561 us-gaap:PreferredStockMember 2020-12-31 0001770561 us-gaap:AdditionalPaidInCapitalMember 2020-12-31 0001770561 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2020-12-31 0001770561 us-gaap:RetainedEarningsMember 2020-12-31 0001770561 us-gaap:NoncontrollingInterestMember 2020-12-31 0001770561 us-gaap:PreferredStockMember 2021-01-01 2021-12-31 0001770561 us-gaap:AdditionalPaidInCapitalMember 2021-01-01 2021-12-31 0001770561 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2021-01-01 2021-12-31 0001770561 us-gaap:RetainedEarningsMember 2021-01-01 2021-12-31 0001770561 us-gaap:NoncontrollingInterestMember 2021-01-01 2021-12-31 0001770561 us-gaap:CommonStockMember 2021-01-01 2021-12-31 0001770561 us-gaap:PreferredStockMember 2021-12-31 0001770561 us-gaap:AdditionalPaidInCapitalMember 2021-12-31 0001770561 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2021-12-31 0001770561 us-gaap:RetainedEarningsMember 2021-12-31 0001770561 us-gaap:NoncontrollingInterestMember 2021-12-31 0001770561 us-gaap:CommonStockMember 2021-12-31 0001770561 us-gaap:DisposalGroupHeldForSaleOrDisposedOfBySaleNotDiscontinuedOperationsMember 2021-12-31 0001770561 us-gaap:DisposalGroupHeldForSaleOrDisposedOfBySaleNotDiscontinuedOperationsMember 2020-12-31 0001770561 c561:GreenbrierSegmentMember 2021-12-31 0001770561 us-gaap:SecuredDebtMember 2020-12-31 0001770561 us-gaap:UnsecuredDebtMember 2020-12-31 0001770561 us-gaap:FairValueMeasurementsRecurringMember us-gaap:CommodityContractMember us-gaap:FairValueInputsLevel1Member 2020-12-31 0001770561 us-gaap:FairValueMeasurementsRecurringMember us-gaap:FairValueInputsLevel2Member us-gaap:CommodityContractMember 2020-12-31 0001770561 us-gaap:FairValueInputsLevel3Member us-gaap:FairValueMeasurementsRecurringMember us-gaap:CommodityContractMember 2020-12-31 0001770561 us-gaap:FairValueMeasurementsRecurringMember us-gaap:CommodityContractMember 2020-12-31 0001770561 us-gaap:FairValueMeasurementsRecurringMember us-gaap:FairValueInputsLevel1Member 2020-12-31 0001770561 c561:JepMiningLlcMember 2021-12-31 0001770561 us-gaap:AccumulatedTranslationAdjustmentMember 2021-01-01 2021-12-31 0001770561 us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember 2021-01-01 2021-12-31 0001770561 c561:AccumulatedGainLossNetCashFlowForeignCurrencyHedgeMember 2021-01-01 2021-12-31 0001770561 c561:AblFacilityMember 2021-12-31 0001770561 us-gaap:FairValueInputsLevel2Member 2021-12-31 0001770561 us-gaap:ForwardContractsMember us-gaap:DesignatedAsHedgingInstrumentMember srt:FuelMember 2021-01-01 2021-12-31 0001770561 us-gaap:ForwardContractsMember us-gaap:OtherCurrentLiabilitiesMember 2021-12-31 0001770561 us-gaap:ForwardContractsMember us-gaap:OtherCurrentLiabilitiesMember 2020-12-31 0001770561 c561:WestVirginiaTaxMember 2021-04-09 0001770561 2021-04-30 0001770561 us-gaap:SeriesAPreferredStockMember 2018-12-31 0001770561 us-gaap:CommonStockMember 2018-10-23 2018-10-23 0001770561 2018-10-23 2018-10-23 0001770561 us-gaap:CommonStockMember c561:ChessDepositaryInterestsMember 2018-10-23 2018-10-23 0001770561 c561:CoronadoGroupLlcMember 2018-12-31 0001770561 c561:ChessDepositaryInterestsMember 2020-08-26 0001770561 c561:PlacementAndRetailmentEntitlementOfferMember 2020-01-01 2020-12-31 0001770561 c561:ChessDepositaryInterestsMember 2021-12-31 0001770561 c561:ChessDepositaryInterestsMember 2020-01-01 2020-12-31 0001770561 2019-03-28 2019-03-29 0001770561 c561:ChessDepositaryInterestsMember 2019-03-31 0001770561 us-gaap:CommonStockMember 2019-03-31 0001770561 c561:CoronadoGroupLlcMember c561:ChessDepositaryInterestsMember 2021-12-31 0001770561 us-gaap:CommonStockMember c561:CoronadoGroupLlcMember 2021-12-31 0001770561 c561:CoronadoGroupLlcMember c561:ChessDepositaryInterestsMember 2021-01-01 2021-12-31 0001770561 c561:CoronadoGroupLlcMember c561:PlacementAndRetailmentEntitlementOfferMember 2021-01-01 2021-12-31 0001770561 c561:CoronadoGroupLlcMember 2020-01-01 2020-12-31 0001770561 us-gaap:CommonStockMember c561:CoronadoGroupLlcMember 2020-12-31 0001770561 c561:ChessDepositaryInterestsMember 2021-05-14 0001770561 us-gaap:CommonStockMember 2021-05-14 0001770561 c561:ChessDepositaryInterestsMember 2021-05-14 2021-05-14 0001770561 c561:ChessDepositaryInterestsMember c561:PlacementAndRetailmentEntitlementOfferMember 2021-06-01 0001770561 us-gaap:CommonStockMember c561:PlacementAndRetailmentEntitlementOfferMember 2021-06-01 0001770561 c561:ChessDepositaryInterestsMember 2021-04-01 2021-06-30 0001770561 c561:CoalRevenueMember c561:XcoalEnergyAndResourcesMember 2021-01-01 2021-05-27 0001770561 c561:CoalRevenueMember c561:XcoalEnergyAndResourcesMember 2020-01-01 2020-12-31 0001770561 c561:CoalRevenueMember c561:XcoalEnergyAndResourcesMember 2019-01-01 2019-12-31 0001770561 us-gaap:ProductMember 2021-01-01 2021-12-31 0001770561 us-gaap:ProductMember 2021-12-31 0001770561 c561:XcoalEnergyAndResourcesMember us-gaap:ProductMember 2020-12-31 0001770561 c561:XcoalEnergyAndResourcesMember us-gaap:ProductMember 2020-01-01 2020-12-31 0001770561 us-gaap:AccountsReceivableMember 2019-12-31 0001770561 us-gaap:OtherAssetsMember 2019-12-31 0001770561 us-gaap:AccountsReceivableMember 2020-12-31 0001770561 us-gaap:OtherAssetsMember 2020-12-31 0001770561 c561:TradeAndRelatedPartyTradeReceivablesNetProvisionExpensesMember 2021-01-01 2021-12-31 0001770561 c561:OtherAssetsRelatedNetProvisionExpenseMember 2021-01-01 2021-12-31 0001770561 c561:TradeAndRelatedPartyTradeReceivablesNetProvisionExpensesMember 2020-01-01 2020-12-31 0001770561 c561:OtherAssetsRelatedNetProvisionExpenseMember 2020-01-01 2020-12-31 0001770561 us-gaap:AccountsReceivableMember 2021-12-31 0001770561 us-gaap:OtherAssetsMember 2021-12-31 0001770561 c561:PlantMachineryMiningEquipmentAndTransportationVehiclesMember 2021-12-31 0001770561 us-gaap:MineDevelopmentMember 2021-12-31 0001770561 us-gaap:BuildingAndBuildingImprovementsMember 2021-12-31 0001770561 us-gaap:OfficeEquipmentMember 2021-12-31 0001770561 us-gaap:ConstructionInProgressMember 2021-12-31 0001770561 us-gaap:LandMember 2021-12-31 0001770561 us-gaap:MiningPropertiesAndMineralRightsMember 2021-12-31 0001770561 us-gaap:AssetRetirementObligationCostsMember 2021-12-31 0001770561 c561:MiningPermitsMember c561:LoganSegmentMember 2021-12-31 0001770561 c561:MiningPermitsMember c561:BuchananSegmentMember 2021-12-31 0001770561 c561:BuchananMember 2021-12-31 0001770561 2021-05-14 2021-05-14 0001770561 c561:SeniorSecuredNotesMember 2021-12-31 0001770561 c561:SeniorSecuredNotesMember 2020-12-31 0001770561 c561:AblFacilityMember 2021-12-31 0001770561 c561:AblFacilityMember 2020-12-31 0001770561 c561:MulticurrencyRevolvingSyndicatedFacilityMember 2021-12-31 0001770561 c561:MulticurrencyRevolvingSyndicatedFacilityMember 2020-12-31 0001770561 c561:SeniorSecuredNotesMember 2021-01-01 2021-12-31 0001770561 c561:AblFacilityMember 2021-01-01 2021-12-31 0001770561 c561:MulticurrencyRevolvingSyndicatedFacilityMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevolvingCreditFacilityMember 2021-05-12 2021-05-12 0001770561 c561:SeniorSecuredNotesMember 2021-05-12 0001770561 c561:SeniorSecuredNotesMember 2021-05-12 2021-05-12 0001770561 c561:AblFacilityMember 2021-05-12 0001770561 c561:SeniorSecuredNotesMember c561:DebtInstrumentRedemptionChangeOfControlMember 2021-05-12 2021-05-12 0001770561 srt:MaximumMember c561:SeniorSecuredNotesMember c561:DebtInstrumentRedemptionChangeOfControlMember 2021-05-12 2021-05-12 0001770561 c561:SeniorSecuredNotesMember c561:DebtInstrumentRedemptionChangesInTaxLawMember 2021-05-12 2021-05-12 0001770561 us-gaap:DebtInstrumentRedemptionPeriodOneMember c561:SeniorSecuredNotesMember 2021-05-12 2021-05-12 0001770561 us-gaap:DebtInstrumentRedemptionPeriodFourMember c561:SeniorSecuredNotesMember 2021-05-12 2021-05-12 0001770561 us-gaap:DebtInstrumentRedemptionPeriodTwoMember c561:SeniorSecuredNotesMember 2021-05-12 2021-05-12 0001770561 us-gaap:DebtInstrumentRedemptionPeriodThreeMember c561:SeniorSecuredNotesMember 2021-05-12 2021-05-12 0001770561 srt:MinimumMember c561:SeniorSecuredNotesMember c561:DebtInstrumentRedemptionChangeOfControlMember 2021-05-12 2021-05-12 0001770561 us-gaap:LetterOfCreditMember c561:AblFacilityMember 2021-05-12 0001770561 us-gaap:LetterOfCreditMember c561:AblFacilityMember 2021-12-31 0001770561 c561:ThirdPartyFinancerMember 2021-01-01 2021-12-31 0001770561 srt:MaximumMember c561:ThirdPartyFinancerMember 2021-01-01 2021-12-31 0001770561 srt:MaximumMember c561:ThirdPartyFinancerMember 2021-12-31 0001770561 c561:ThirdPartyFinancerMember 2021-12-31 0001770561 us-gaap:OtherCurrentLiabilitiesMember 2020-12-31 0001770561 us-gaap:OtherNoncurrentLiabilitiesMember 2020-12-31 0001770561 us-gaap:EmployeeStockOptionMember c561:AwardedIn2021Member 2021-12-31 0001770561 us-gaap:PerformanceSharesMember c561:AwardedIn2021Member 2021-12-31 0001770561 c561:AwardedIn2021Member 2021-01-01 2021-12-31 0001770561 c561:SafetyMember c561:ScorecardAwardsMember c561:AwardedIn2020And2021Member 2021-01-01 2021-12-31 0001770561 c561:TotalShareholderReturnMember c561:ScorecardAwardsMember c561:AwardedIn2020And2021Member 2021-01-01 2021-12-31 0001770561 c561:ScorecardAwardsMember c561:CashflowMember c561:AwardedIn2020And2021Member 2021-01-01 2021-12-31 0001770561 c561:RelativeTotalShareholderReturnMember c561:TotalShareholderReturnMember c561:AwardedIn2020And2021Member 2021-01-01 2021-12-31 0001770561 c561:AwardedIn2018Member c561:RelativeTotalShareholderReturnMember c561:TotalShareholderReturnMember 2021-01-01 2021-12-31 0001770561 c561:AwardedIn2018Member c561:SafetyMember c561:ScorecardAwardsMember 2021-01-01 2021-12-31 0001770561 c561:AwardedIn2018Member c561:ScorecardAwardsMember c561:ProductionMember 2021-01-01 2021-12-31 0001770561 c561:AwardedIn2018Member c561:ScorecardAwardsMember c561:ProductionCostsMember 2021-01-01 2021-12-31 0001770561 us-gaap:PerformanceSharesMember 2019-12-31 0001770561 us-gaap:PerformanceSharesMember 2021-12-31 0001770561 us-gaap:PerformanceSharesMember c561:AwardedIn2021Member 2021-01-01 2021-12-31 0001770561 c561:ChessDepositaryInterestsMember 2019-08-05 2019-08-05 0001770561 us-gaap:CorporateNonSegmentMember 2021-12-31 0001770561 us-gaap:OperatingSegmentsMember 2021-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2021-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2021-12-31 0001770561 c561:StanwellBelowMarketCoalSupplyAgreementMember 2021-12-31 0001770561 c561:CoalLeasesContractLiabilityMember 2021-12-31 0001770561 us-gaap:UnsecuredDebtMember srt:MaximumMember 2021-12-31 0001770561 c561:StanwellReservedAreaDeferredConsiderationMember 2021-12-31 0001770561 us-gaap:WorkersCompensationInsuranceMember 2021-12-31 0001770561 us-gaap:AccumulatedTranslationAdjustmentMember 2021-12-31 0001770561 us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember 2021-12-31 0001770561 c561:AccumulatedGainLossNetCashFlowForeignCurrencyHedgeMember 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember c561:CustomerAMember us-gaap:CustomerConcentrationRiskMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember c561:CustomerAMember us-gaap:CustomerConcentrationRiskMember 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember c561:CustomerAMember us-gaap:CustomerConcentrationRiskMember 2019-01-01 2019-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember c561:CustomerBMember us-gaap:CustomerConcentrationRiskMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember c561:CustomerBMember us-gaap:CustomerConcentrationRiskMember 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember c561:CustomerBMember us-gaap:CustomerConcentrationRiskMember 2019-01-01 2019-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember srt:NorthAmericaMember us-gaap:GeographicConcentrationRiskMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember srt:NorthAmericaMember us-gaap:GeographicConcentrationRiskMember 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember srt:NorthAmericaMember us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember country:AU us-gaap:GeographicConcentrationRiskMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember country:AU us-gaap:GeographicConcentrationRiskMember 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember country:AU us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember srt:AsiaMember us-gaap:GeographicConcentrationRiskMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember srt:AsiaMember us-gaap:GeographicConcentrationRiskMember 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember srt:AsiaMember us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember srt:EuropeMember us-gaap:GeographicConcentrationRiskMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember srt:EuropeMember us-gaap:GeographicConcentrationRiskMember 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember srt:EuropeMember us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember srt:SouthAmericaMember us-gaap:GeographicConcentrationRiskMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember srt:SouthAmericaMember us-gaap:GeographicConcentrationRiskMember 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember c561:BrokeredSalesMember us-gaap:GeographicConcentrationRiskMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember c561:BrokeredSalesMember us-gaap:GeographicConcentrationRiskMember 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember c561:BrokeredSalesMember us-gaap:GeographicConcentrationRiskMember 2019-01-01 2019-12-31 0001770561 us-gaap:DisposalGroupHeldForSaleOrDisposedOfBySaleNotDiscontinuedOperationsMember c561:AmonateSegmentMember 2021-01-01 2021-12-31 0001770561 us-gaap:DisposalGroupHeldForSaleOrDisposedOfBySaleNotDiscontinuedOperationsMember c561:GreenbrierSegmentMember 2021-12-31 0001770561 c561:EmgGroupMember 2021-05-12 0001770561 c561:EmgGroupMember 2021-11-16 0001770561 c561:EmgGroupMember 2021-12-31 0001770561 c561:PlacementMember 2020-01-01 2020-12-31 0001770561 c561:CoalRevenueMember us-gaap:FinancialAssetPastDueMember 2021-12-31 0001770561 c561:CoalRevenueMember us-gaap:FinancialAssetPastDueMember 2020-12-31 0001770561 c561:ChessDepositaryInterestsMember 2020-12-31 0001770561 c561:CoalRevenueMember 2021-05-28 2021-12-31 0001770561 us-gaap:AccountsReceivableMember us-gaap:CustomerConcentrationRiskMember c561:CustomerBalancesIndividuallyRepresented10OrMoreMember 2021-01-01 2021-12-31 0001770561 us-gaap:SalesRevenueNetMember us-gaap:CustomerConcentrationRiskMember c561:CustomerBalancesIndividuallyRepresented10OrMoreMember 2021-01-01 2021-12-31 0001770561 c561:CoronadoGroupLlcMember us-gaap:UnionizedEmployeesConcentrationRiskMember c561:LaborMember 2021-01-01 2021-12-31 0001770561 c561:FinanceleaseMember 2021-12-31 0001770561 c561:FinanceleaseMember 2020-12-31 0001770561 c561:FiveCustomersMember 2021-01-01 2021-12-31 0001770561 c561:FiveCustomersMember 2020-01-01 2020-12-31 0001770561 c561:FiveCustomersMember 2019-01-01 2019-12-31 0001770561 c561:FourCustomersMember 2021-12-31 0001770561 c561:FourCustomersMember 2020-12-31 0001770561 us-gaap:SalesRevenueNetMember us-gaap:CustomerConcentrationRiskMember c561:FiveCustomersMember 2021-01-01 2021-12-31 0001770561 us-gaap:SalesRevenueNetMember us-gaap:CustomerConcentrationRiskMember c561:FiveCustomersMember 2020-01-01 2020-12-31 0001770561 us-gaap:SalesRevenueNetMember us-gaap:CustomerConcentrationRiskMember c561:FiveCustomersMember 2019-01-01 2019-12-31 0001770561 us-gaap:AccountsReceivableMember us-gaap:CustomerConcentrationRiskMember c561:FourCustomersMember 2021-01-01 2021-12-31 0001770561 us-gaap:AccountsReceivableMember us-gaap:CustomerConcentrationRiskMember c561:FourCustomersMember 2020-01-01 2020-12-31 0001770561 c561:XcoalEnergyAndResourcesMember us-gaap:ProductMember 2021-01-01 2021-12-31 0001770561 c561:ChessDepositaryInterestsMember c561:PlacementAndRetailmentEntitlementOfferMember 2021-05-14 0001770561 us-gaap:CommonStockMember 2018-01-01 2018-12-31 0001770561 us-gaap:DebtInstrumentRedemptionPeriodThreeMember c561:SeniorSecuredNotesMember 2021-01-01 2021-12-31 iso4217:AUD iso4217:USD utr:l xbrli:pure xbrli:shares iso4217:USD xbrli:shares utr:segment iso4217:AUD xbrli:shares

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

___________________________________________________

FORM 10-K

___________________________________________________

(Mark One)

☒ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2021

OR

☐TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from                     to                     

Commission File Number: 000-56044

___________________________________________________

Coronado Global Resources Inc.

(Exact name of registrant as specified in its charter)

___________________________________________________

Delaware

 

83-1780608

(State or other jurisdiction of

incorporation or organization)

 

(I.R.S. Employer

Identification No.)

Level 33, Central Plaza One, 345 Queen Street

Brisbane, Queensland, Australia, 4000

(Address of principal executive offices) (Zip Code)

(61) 7 3031 7777

(Registrant’s telephone number, including area code)

___________________________________________________

Securities registered pursuant to Section 12(b) of the Act:

Title of each class

 

Trading Symbol(s)

 

Name of each exchange on which registered

None

 

None

 

None

 

Securities registered pursuant to Section 12(g) of the Act:

Title of each class

 

 

 

Name of each exchange on which registered

Common stock, par value $0.01 per share

 

 

 

None

 

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.

Yes ☐No ☒

Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.

Yes ☐No ☒

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Yes ☒ No ☐

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).

Yes ☒ No ☐

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Large accelerated filer

☐

Accelerated filer

☒

Non-accelerated filer

☐

Smaller reporting company

☐

 

 

Emerging growth company

☐

 

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. ☒

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).

Yes ☐ No  ☒

 


 

The registrant’s common stock is publicly traded on the Australian Securities Exchange in the form of CHESS Depositary Interests, or CDIs, convertible at the option of the holders into shares of the registrant’s common stock on a 10-for-1 basis. The aggregate market value of the registrant’s common stock, par value $0.01 per share, in the form of CDIs, held by non-affiliates of the registrant (without admitting that any person whose shares are not included in such calculation is an affiliate), computed by reference to the price at which the CDIs were last sold on June 30, 2021, the last business day of the registrant’s most recently completed second fiscal quarter, as reported on the Australian Securities Exchange, was $523,449,082.

 

The total number of shares of the registrant’s common stock, par value $0.01 per share, outstanding on December 31, 2021, including shares of common stock underlying CDIs, was 167,645,373.

 

DOCUMENTS INCORPORATED BY REFERENCE

 

Portions of the registrant’s proxy statement to be filed with the Securities and Exchange Commission in connection with the registrants 2022 annual meeting of stockholders are incorporated by reference into Part III of this Annual Report on Form 10-K. Documents incorporated by reference in this report are listed in the Exhibit Index of this Annual Report on Form 10-K.

 


 

TABLE OF CONTENTS

 

 

 

Page Number

 

 

 

 

 

PART I

 

 

 

Item 1.

Business

7

 

Item 1A.

Risk Factors

43

 

Item 1B.

Unresolved Staff Comments

76

 

Item 2.

Properties

77

 

Item 3.

Legal Proceedings

99

 

Item 4.

Mine Safety Disclosures

100

 

 

 

 

 

PART II

 

 

 

Item 5.

Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities

101

 

Item 6.

[Reserved]

102

 

Item 7.

Management’s Discussion and Analysis of Financial Condition and Results of Operations

103

 

Item 7A.

Quantitative and Qualitative Disclosures About Market Risk

121

 

Item 8.

Financial Statements and Supplementary Data

123

 

Item 9.

Changes in and Disagreements with Accountants on Accounting and Financial Disclosure

170

 

Item 9A.

Controls and Procedures

171

 

Item 9B.

Other Information

173

 

Item 9C.

Disclosure Regarding Foreign Jurisdictions that Prevent Inspections

173

 

 

 

 

 

PART III

 

 

 

Item 10.

Directors, Executive Officers and Corporate Governance

174

 

Item 11.

Executive Compensation

174

 

Item 12.

Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters

174

 

Item 13.

Certain Relationships and Related Transactions, and Director Independence

174

 

Item 14.

Principal Accountant Fees and Services

174

 

 

 

 

 

PART IV

 

 

 

Item 15.

Exhibits, Financial Statement Schedules

175

 

Item 16.

Form 10-K Summary

179

 

 

 

 

 

SIGNATURES

 

180

 

 

 

 

 

 

 

 

 


Table of Contents

 

EXPLANATORY NOTE

Unless otherwise noted, references in this Annual Report on Form 10-K to “we,” “us,” “our,” “Company,” or “Coronado” refer to Coronado Global Resources Inc. and its consolidated subsidiaries and associates, unless the context indicates otherwise.

All production and sales volumes contained in this Annual Report on Form 10-K are expressed in metric tons, or Mt, millions of metric tons, or MMt, or millions of metric tons per annum, or MMtpa, except where otherwise stated. One Mt (1,000 kilograms) is equal to 2,204.62 pounds and is equivalent to 1.10231 short tons. In addition, all dollar amounts contained herein are expressed in United States dollars, or US$, except where otherwise stated. References to “A$” are references to Australian dollars, the lawful currency of the Commonwealth of Australia, or the Commonwealth. Some numerical figures included in this Annual Report on Form 10-K have been subject to rounding adjustments. Accordingly, numerical figures shown as totals in certain tables may not equal the sum of the figures that precede them.

CAUTIONARY NOTICE REGARDING FORWARD-LOOKING STATEMENTS

This Annual Report on Form 10-K contains “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, or the Securities Act, and Section 21E of the Securities Exchange Act of 1934, as amended, or the Exchange Act, concerning our business, operations, financial performance and condition, the coal, steel and other industries, as well as our plans, objectives and expectations for our business, operations, financial performance and condition. Forward-looking statements may be identified by words such as “may,” “could,” “believes,” “estimates,” “expects,” “intends,” “plans,” “anticipate,” “forecast,” “outlook,” “target,” “likely,” “considers” and other similar words.

Any forward-looking statements involve known and unknown risks, uncertainties, assumptions and other important factors that could cause actual results, performance, events or outcomes to differ materially from the results, performance, events or outcomes expressed or anticipated in these statements, many of which are beyond our control. Such forward-looking statements are based on an assessment of present economic and operating conditions on a number of best estimate assumptions regarding future events and actions. These factors are difficult to accurately predict and may be beyond our control. Factors that could affect our results, our announced plans or an investment in our securities include, but are not limited to:

•uncertainty in global economic conditions, including the extent, duration and impact of the COVID-19 pandemic, as well as risks related to government actions with respect to trade agreements, treaties or policies;

•severe financial hardship, bankruptcy, temporary or permanent shut downs or operational challenges, due to the ongoing COVID-19 pandemic or any similar future health crisis, pandemic or epidemic, of one or more of our major customers, including customers in the steel industry, key suppliers/contractors, which among other adverse effects, could lead to reduced demand for our coal, increased difficulty collecting receivables and customers and/or suppliers asserting force majeure or other reasons for not performing their contractual obligations to us;

•our ability to generate sufficient cash to service our indebtedness and other obligations;

•our indebtedness and ability to comply with the covenants and other undertakings under the agreements governing such indebtedness;

•our ability to collect payments from our customers depending on their creditworthiness, contractual performance or otherwise;

•the prices we receive for our coal;

•the demand for steel products, which impacts the demand for our metallurgical, or Met, coals;

•risks inherent to mining;

•the loss of, or significant reduction in, purchases by our largest customers;

•risks unique to international mining and trading operations, including tariffs and other barriers to trade;

•unfavorable economic and financial market conditions;

Coronado Global Resources Inc. Form 10-K December 31, 2021 4


Table of Contents

 

•our ability to continue acquiring and developing coal reserves that are economically recoverable;

•uncertainties in estimating our economically recoverable coal reserves;

•transportation for our coal becoming unavailable or uneconomic for our customers;

•the risk that we may be required to pay for unused capacity pursuant to the terms of our take-or-pay arrangements with rail and port operators;

•our ability to retain key personnel and attract qualified personnel;

•any failure to maintain satisfactory labor relations;

•our ability to obtain, renew or maintain permits and consents necessary for our operations;

•potential costs or liability under applicable environmental laws and regulations, including with respect to any exposure to hazardous substances caused by our operations, as well as any environmental contamination our properties may have or our operations may cause;

•extensive regulation of our mining operations and future regulations and developments;

•our ability to provide appropriate financial assurances for our obligations under applicable laws and regulations;

•assumptions underlying our asset retirement obligations for reclamation and mine closures;

•concerns about the environmental impacts of coal combustion, including perceived impacts on global climate issues, which could result in increased regulation of coal combustion in many jurisdictions and divestment efforts affecting the investment community;

•the extensive forms of taxation that our mining operations are subject to, and future tax regulations and developments;

•any cyber-attacks or other security breaches that disrupt our operations or result in the dissemination of proprietary or confidential information about us, our customers or other third parties;

•a decrease in the availability or increase in costs of key supplies, capital equipment or commodities, such as diesel fuel, steel, explosives and tires;

•the risk that we may not recover our investments in our mining, exploration and other assets, which may require us to recognize impairment charges related to those assets;

•risks related to divestitures and acquisitions;

•the risk that diversity in interpretation and application of accounting principles in the mining industry may impact our reported financial results; and

•other risks and uncertainties described in Item 1A. “Risk Factors.”

We make many of our forward-looking statements based on our operating budgets and forecasts, which are based upon detailed assumptions. While we believe that our assumptions are reasonable, we caution that it is very difficult to predict the impact of known factors, and it is impossible for us to anticipate all factors that could affect our actual results.

See Item 1A. “Risk Factors” and elsewhere in this Annual Report on Form 10-K for a more complete discussion of the risks and uncertainties mentioned above and for discussion of other risks and uncertainties we face that could cause actual results to differ materially from those expressed or implied by these forward-looking statements.

All forward-looking statements attributable to us are expressly qualified in their entirety by these cautionary statements, as well as others made in this Annual Report on Form 10-K and hereafter in our other filings with the Securities and Exchange Commission, or SEC, and public communications. You should evaluate all forward-looking statements made by us in the context of these risks and uncertainties.

Coronado Global Resources Inc. Form 10-K December 31, 2021 5


Table of Contents

 

We caution you that the risks and uncertainties identified by us may not be all of the factors that are important to you. You should not interpret the disclosure of any risk to imply that the risk has not already materialized. Furthermore, the forward-looking statements included in this Annual Report on Form 10-K are made only as of the date hereof. We undertake no obligation to publicly update or revise any forward-looking statement as a result of new information, future events, or otherwise, except as required by applicable law.

Coronado Global Resources Inc. Form 10-K December 31, 2021 6


Table of Contents

 

PART I

ITEM 1. BUSINESS.

Overview

We are a leading producer, global marketer and exporter of a full range of Met coals. We own a portfolio of operating mines and development projects in Queensland in Australia, and in Virginia, West Virginia and Pennsylvania in the United States. We are one of the largest Met coal producers globally by export volume, serving customers on five continents.

Our operations in Australia, or our Australian Operations, consist of the 100%-owned Curragh producing mining property located in the Bowen Basin of Australia. Our operations in the United States, or our U.S. Operations, consists of two producing mining properties (Buchanan and Logan), one temporarily idled mining property (Greenbrier) and two development mining properties (Mon Valley, formerly named Pangburn-Shaner-Fallowfield, and Russell County), primarily located in the Central Appalachian region of the United States, or CAPP, all of which are 100%-owned. Our U.S. Operations and Australian Operations are strategically located for access to transportation infrastructure. In addition to Met coal, our Australian Operations sell thermal coal under a long-term legacy contract assumed in the acquisition of Curragh, which is used to generate electricity, to Stanwell Corporation Limited, or Stanwell, a Queensland government-owned entity and the operator of the Stanwell Power Station located near Rockhampton, Queensland, and some thermal coal in the export market. Our U.S. Operations also produce and sell some thermal coal that is extracted in the process of mining Met coal.

Location of Australian Operations

Location of U.S. Operations

Picture 23

Picture 5

 

Our core business strategy focuses on the production of Met coal for the North American and seaborne export markets. Sales of Met coal represented 94.6% of our total coal revenues for the year ended December 31, 2021. Most of the Met coal that we produce is sold, directly or indirectly, to steel producers. Met coal sales represented 81.4% of our total volume of coal sold in 2021. The remaining 18.6% of our total volume sold in 2021 was thermal coal, the majority of which was sold to Stanwell.

Met coal is a key ingredient in the production of steel using blast furnaces, and approximately 770 kilograms of Met coal is required to produce one ton of steel.

We have a geographically diverse customer base, across a range of global markets. Major consumers of our seaborne Met coal in 2021 were located in high-growth Asian markets, Brazil and Europe. These consumers are all major global steel or Met coke producers. We are well-positioned in the key high-growth Asian markets (Japan, South Korea and India) as sales to direct end users in Asia represented 48.3% of our total revenue, including Tata Steel Limited, or Tata Steel, which accounted for 16.7% of total revenue, in 2021.

The charts below show the split of our direct sales by geographic region in 2021 and the split of our revenues and sales volume by export and domestic sales in 2019, 2020 and 2021.

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 7


Table of Contents

 

customersdirectsales

 

ExportRatioL2Y

ExportRatioPY

ExportRatioCY

 

To support our operations, we have proven and probable coal reserves totaling 556 MMt as of December 31, 2021, 215 MMt and 341 MMt of which are in Australia and the United States, respectively. For more information regarding our coal reserves, see Item 2. “Properties.”

COVID-19

The ongoing COVID-19 global pandemic has continued to result in a challenging working environment. Authorities in many countries around the world have implemented numerous and varying measures to reduce the spread and limit the impact of COVID-19, including travel bans and restrictions, quarantines, curfews, stay-at-home orders, business shutdowns and closures. Many countries have implemented multi-stage policies with the goal of re-opening markets and boosting economic activity.

There is uncertainty regarding how the COVID-19 pandemic will continue to impact our business including whether it will result in further changes in demand for Met coal, increases in operating costs or impacts to our supply chain, and whether measures will result in port closures or border restrictions, each or all of which can impact our ability to produce and sell our products.

The safety and wellbeing of our workforce remains our highest priority and we continue to manage the potential threat of COVID-19 at our mines and offices. The Company’s COVID-19 Steering Committee, formed in 2020, has successfully monitored the effect of the pandemic across our Australian Operations and U.S. Operations and continues to implement proactive preventative measures to ensure the safety and well-being of employees and contractors. These procedures include increased screenings of employees as they arrive at the workplace, strict adherence to hygiene and social distancing guidelines while at work and also a cleaning and sanitization program for equipment and facilities.

Coronado Global Resources Inc. Form 10-K December 31, 2021 8


Table of Contents

 

Throughout 2021 the COVID-19 Steering Committee focused on encouraging all workers across all jurisdictions to be vaccinated. This included providing access to educational materials about vaccine safety and efficiency, as well as arranging for several vaccination clinics to be held close to our U.S. Operations and Australian Operations in order to ensure access and availability for all employees. During the year ended December 31, 2021, we implemented a Vaccine Incentive Program at our U.S. Operations that provides cash payment to employees who provided proof of vaccination. Since the program commenced, vaccination rates amongst our U.S. workforce has improved significantly. At our Australian Operations, vaccination rates continue to increase as the Australian Federal and Queensland state government’s vaccination program roll out. See Item 7. “Management’s Discussion and Analysis of Financial Condition and Results of Operations—Overview”.

History and Australian Public Offering

We were founded in 2011 by Garold Spindler, James Campbell and a fund affiliated with The Energy & Minerals Group, or EMG, with the intention of evaluating, acquiring and developing Met coal properties.

Since 2011, Coronado Coal LLC, a Delaware limited liability company, and other affiliated entities, including Coronado Group LLC, a Delaware limited liability company, which we refer to, collectively, as Coronado Group, have grown the scale and platform of our current operations principally from four acquisitions:

•in 2013, Coronado Group acquired Greenbrier from Lehman Brothers;

•in 2014, Coronado Group acquired Logan from Cliffs Natural Resources Inc. (now known as Cleveland-Cliffs Inc.);

•in 2016, Coronado Group acquired Buchanan from CONSOL Energy Inc., or CONSOL Energy; and

•in 2018, Coronado Group acquired Wesfarmers Curragh Pty Ltd (now known as Coronado Curragh Pty Ltd), including the Curragh producing mining property, from Wesfarmers Ltd, or Wesfarmers.

Prior to the initial public offering, Coronado Global Resources Inc., our parent company, was a wholly-owned subsidiary of Coronado Group LLC, which is currently owned by funds managed by EMG, which we refer to, collectively, as the EMG Group, and certain members of our management.

On October 23, 2018, we completed an initial public offering on the Australian Securities Exchange, or ASX, which we refer to as the Australian IPO.

On May 14, 2021, we successfully completed the institutional component of a fully underwritten 1-for-4.73 pro-rata accelerated non-renounceable entitlement offer, or the Entitlement Offer. On completion, a total of 253,108,820 fully paid new CDIs (representing a beneficial interest in 25,310,882 shares of common stock) were issued, which are traded on the ASX.

On June 1, 2021, we successfully completed the retail component of the Entitlement Offer. On completion, a total of 39,466,010 fully paid new CDIs (representing a beneficial interest in 3,946,601 shares of common stock) were issued, which are traded on the ASX.

Coronado Group LLC, the Company’s controlling stockholder, exercised its right to participate in the institutional component of the Entitlement Offer and purchased 71,980,363 of the new CDIs (representing a beneficial interest in 7,198,036.3 shares of common stock).

As of December 31, 2021, the EMG Group and management beneficially own approximately 50.4% of the issued and outstanding shares of our common stock through their ownership of Coronado Group LLC. The remaining 49.6% is owned by public investors in the form of CDIs traded on the ASX. In addition, Coronado Group LLC holds one share of preferred stock Series A, par value $0.01 per share, of the Company, or the Series A Share, which is the only share of preferred stock issued and outstanding. The holder of the Series A Share is permitted to nominate and elect members of our Board of Directors in relation to the level of the holder’s aggregate beneficial ownership of shares of our common stock.

Coronado Global Resources Inc. Form 10-K December 31, 2021 9


Table of Contents

 

Organizational Structure

The following chart shows our current organizational structure:

Picture 1

Overview of Operations

Met Coal

Met coals are primarily used in the manufacture of coke, which is used in the steel-making process, as well as direct injection into a blast furnace as a replacement for coke.

Sales of Met coal represented approximately 94.6% of our total coal revenues for the year ended December 31, 2021. Most of the Met coal that we produce is sold, directly or indirectly, to steel producers. The steel industry’s demand for Met coal is affected by several factors, including the cyclical nature of that industry’s business, general economic conditions and demand for steel, tariffs on steel and steel products, technological developments in the steelmaking process and the availability and cost of substitutes for steel, such as aluminum, composites and plastics. We compete based on coal quality and characteristics, price, customer service and support and reliability of supply. Seaborne Met coal import demand can be significantly impacted by the availability of indigenous coal production, particularly in the leading Met coal import countries of China and India, among others, and the competitiveness of seaborne Met coal supply, including from the leading Met coal exporting countries of Australia, the United States, Russia, Canada and Mongolia, among others.

Thermal Coal

Sales of thermal coal represented approximately 5.4% of our total coal revenues for the year ended December 31, 2021. The thermal coal we produce is predominantly a byproduct of mining Met coal. The thermal coal we produce is sold, directly or indirectly, to power stations, predominantly Stanwell, as an energy source in the generation of electricity. Demand for our thermal coal products is impacted by economic conditions, environmental regulation, demand for electricity, including the impact of energy efficient products, and the cost of electricity generation from alternative fuels. Our thermal coal products primarily compete with producers of other forms of electric generation, including natural gas, oil, nuclear, hydro, wind, solar and biomass, that provide an alternative to coal use.

Coronado Global Resources Inc. Form 10-K December 31, 2021 10


Table of Contents

 

Segments

In accordance with Accounting Standards Codification, or ASC, Topic 280, Segment Reporting, we have adopted the following reporting segments:

•Australia; and

•United States.

In addition, “Other and Corporate” is not a reporting segment but is disclosed for the purposes of reconciliation to our consolidated financials.

These segments are grouped based on geography and reflect how we currently monitor and report the results of the business to the Chief Executive Officer who is our chief operating decision maker, or CODM, Chief Operating Officer - United States, Chief Operating Officer - Australia and the Group Chief Financial Officer. Factors affecting and differentiating the financial performance of each of these two reportable segments generally include coal quality, geology, coal marketing opportunities, mining and transportation methods and regulatory issues. We believe this method of segment reporting reflects the way our business segments are currently managed, resources are allocated and the way the performance of each segment is evaluated. The two segments consist of similar operating activities as each segment produces similar products.

Diversification

We have 100% ownership over all four of our operating mines, allowing us full control over all operating decisions. This control is critical during times of crisis, such as the ongoing COVID-19 pandemic, and it allowed us to react swiftly and decisively to temporarily idle our U.S. operating mines in response to a quick, sharp and unprecedented contraction in demand from Europe, Brazil and North America during the first half of 2020. On June 1, 2020, we resumed production at the Buchanan and Logan mines in the U.S. The Greenbrier mine remains idle and is currently held for sale.

The below charts show run-of-mine, or ROM, production and saleable production for our Australian Operations and our U.S. Operations for the years ended December 31, 2021, 2020 and 2019.

 

romchart

saleableprodchart

 

We benefit from a geographically diverse asset base, in Australia and the United States, with access to multiple transportation infrastructure options, including key rail and port infrastructure, providing access to both seaborne export and domestic markets. We have access to the key major markets in both the Atlantic and Pacific basins, and our wide footprint provides flexibility to respond quickly to changes in global market demands.

The low cost nature of our assets is a function of the quality of the assets and the available mine infrastructure to extract our reserves efficiently. We believe being geographically diverse allows us to sell our products to our customers in a number of countries. This allows the sales team to leverage these relationships to provide value added solutions like blends with third parties, which is margin accretive.

Our production is diversified across high quality products, such as hard coking coal, or HCC, semi coking coals, or SCC, and pulverized coal injection, or PCI, coal from our Australian Operations, and significant production of HCC, comprising high volatile content, or High-Vol, (including sub-category A of High-Vol, or HVA, and

Coronado Global Resources Inc. Form 10-K December 31, 2021 11


Table of Contents

 

sub-category B of High-Vol, or HVB), coal with medium volatile content, or Mid-Vol, and coal with low volatile content, or Low-Vol, coals from our U.S. Operations. This broad product range supports a wide variety of customer requirements and various blending opportunities, being valued for its attractive coke-making characteristics.

AUcoaloffering

UScoaloffering

 

We have a dedicated global marketing team that generates direct sales for our Met coal. Our customer base spans across a full spectrum of key global markets. We sell directly to a number of large, high-quality and well-known companies in the steel industry globally. Many of our core customers have been our longstanding customers for over 20 years, and source our products as essential base load, which translates into a long history of contract renewal for such customers. We are a major supplier to tier one steel mills in Japan, South Korea, Taiwan, India, Europe, Brazil, North America and China. Given the quality of our diverse customer base, we believe the demand for our products is insulated across all stages of the commodity cycle. This flexibility is reflected in our ability to take advantage of current favorable pricing into China out of the United States.

2021 Coronado’s coal trade flows

Picture 395

Overview of Australian Operations—Curragh

Curragh is located in Queensland’s Bowen Basin, one of the world’s premier Met coal regions. Curragh has been operating since 1983, and produces a variety of high-quality, low-ash Met coal products. We believe our HCC product is recognized by steelmakers for its low-ash content, consistency of quality and favorable coking attributes. We believe that our SCC products are similarly valued, in particular for their low wall pressure, which makes them suitable for stamp charging coke ovens, and our PCI coal at Curragh is recognized by steelmakers

Coronado Global Resources Inc. Form 10-K December 31, 2021 12


Table of Contents

 

for its low phosphorus and sulphur content. These Met coal products are exported globally to a diverse customer base located primarily in Asia. Curragh also produces thermal coal. The thermal coal produced at Curragh is primarily sold domestically under a long-term contract to Stanwell, with a limited amount being exported.

Revenues from our Australian Operations represented 61.2% of our total revenue for the year ended December 31, 2021. See Item 2. “Properties” for more information regarding Curragh.

AU_Revenuemix

 

For the year ended December 31, 2021, 72.3% of the total volume of coal sold by our Australian Operations was Met coal and 27.7% of the total volume of coal sold by our Australian Operations was thermal coal, the majority of which is sold to Stanwell. For the year ended December 31, 2021, Curragh sold 8.0 MMt of Met coal into the seaborne coal markets. The majority of customers purchase multiple grades or products and have purchased Curragh coal continuously through all stages of the coal/commodity pricing cycle. Curragh’s Met coal is typically sold on annual contracts negotiated by our Australian Operations’ sales managers, with pricing agreed to bilaterally or with reference to benchmark indices or spot indices. Our Australian Operations have maintained a high level of contract coverage against planned production. In 2021, approximately 90% of Curragh’s Met coal export sales were made under term contracts (with the balance sold on framework contracts that do not involve a binding commitment to supply, or in the spot market).

Overview of U.S. Operations—Buchanan and Logan

Our producing mining properties in the United States are located in the CAPP region, specifically in Virginia and West Virginia, which is a highly-developed, active, coal-producing region. Met coal produced by our U.S. Operations is consumed regionally by North American steel producers or exported by seaborne transportation to steel producers (primarily in Asia, Europe and South America). The U.S. Operations also produce small quantities of thermal coal that is extracted in the process of mining Met coal, which is sold predominantly to global export markets, as well as within North America. We believe that many regard Met coal from the CAPP region (where our U.S. Operations are located) to be of the highest quality in the world owing to its generally low-ash and sulphur content. Our U.S. Operations offer a range of Met coal products, with significant production of HCC, comprising High-Vol (including HVA and HVB), coal with Mid-Vol, and coal with Low-Vol.

Sales from our U.S. Operations to export markets are typically priced with reference to a benchmark index. We generally sell our seaborne coal through intermediaries Free on Rail (Incoterms 2010), or FOR., and, therefore, our realized price on FOR sales does not include transportation to the seaborne port or costs to transload into a vessel. Consistent with seaborne sales, sales to North American customers are generally sold on a FOR. basis where the customer arrangers for and incurs the cost of transportation to their facility.

A portion of our sales is sold to North American steel and coke producers on annual contracts at fixed prices that do not fluctuate with the benchmark index. The fixed-price nature of these annual contracts provides us with visibility on our future revenues, as compared to spot sales or sales priced with reference to a benchmark index. For 2022, we have entered into annual contracts to sell approximately 2.9 MMt Met coal with North American steel and coke producers. During periods of stable and rising prices, we strive to take advantage of the spot market. Spot export contracts are negotiated throughout the year. Revenues from our U.S. Operations, in the

Coronado Global Resources Inc. Form 10-K December 31, 2021 13


Table of Contents

 

aggregate, represented 38.8% of our total revenue for the year ended December 31, 2021. See Item 2. “Properties” for more information regarding Buchanan, Logan and the other mining properties that compose our U.S. Operations.

US_Revenue mix

 

For the year ended December 31, 2021, 97.2% of the total volume of coal sold by our U.S. Operations was Met coal and 2.8% was thermal coal. We sold 73.9% of total Met coal from our U.S. Operations into the seaborne Met coal markets for the year ended December 31, 2021.

The Greenbrier mine remains idled since April 1, 2020, following the 2020 economic downturn and decline in demand induced by COVID-19 and is classified as held for sale in our Consolidated Balance Sheets.

Customers

We sell most of our coal to steel producers, either directly or through intermediaries, such as brokers. We also sell thermal coal to electricity generators either directly or through intermediaries such as brokers. Major consumers of our seaborne Met coal in 2021 were located in India, China, Japan, South Korea, Taiwan, Brazil and Europe. These consumers are all major global steel or Met coke producers. The majority of our sales are made under contracts with terms of typically one year or on a spot basis.

Customerschart

 

Tata Steel

Our U.S. Operations and Australian Operations are parties to a Long Term Coal Sale and Purchase Agreement with Tata Steel, or the Tata Steel Long Term Agreement, with a term ending in March 2022. We have commenced negotiations with TATA Steel to extend our long term relationship after the expiry of the current agreement.

Coronado Global Resources Inc. Form 10-K December 31, 2021 14


Table of Contents

 

The Tata Steel Long Term Agreement provides for the sale of a minimum of 3.0 MMt of coal per contract year, consisting of certain specific quantities of Hard Coking Coal, or HCC, Semi Coking Coal and pulverized coal injection, or PCI, Coal. Pricing is re-negotiated each quarter, with coal sales priced in reference to benchmark indices. If we fail to agree on a quarterly price, the Tata Steel Long Term Agreement provides for alternative pricing based on historical market prices and the continuance of deliveries until an agreement on pricing can be reached. Coal sold pursuant to the Tata Steel Long Term Agreement is sold Free on Board (Incoterms 2010), or FOB, and the agreement contains industry-standard terms and conditions with respect to delivery, transportation, inspection, assignment, taxes and performance failure.

Xcoal

In 2021, we sold 2.2 MMt of coal to Xcoal Energy Resources LLC, or Xcoal, largely from our U.S. Operations. Coal revenues from Xcoal represented 28.3% of coal revenues from our U.S. Operations. Purchase orders with Xcoal are entered into primarily on an ad hoc (shipment-by-shipment) basis. Xcoal, as well as other customers, typically take ownership of coal upon loading into the rail car (FOR) and are responsible for handling transportation logistics to the port and beyond. From July 1, 2021, we agreed to credit terms with Xcoal, and any sales to Xcoal in excess of the credit amount are made on prepayment, letter of credit or cash on delivery terms.

Stanwell

We are party to contractual arrangements with Stanwell, including a Coal Supply Agreement, or the CSA, and the Curragh Mine New Coal Supply Deed, dated August 14, 2018, or the Supply Deed.

Under the CSA, we deliver thermal coal from Curragh to Stanwell at an agreed price and quantity. Stanwell may vary the quantity of thermal coal purchased each year so the total quantity to be delivered to Stanwell each year cannot be precisely forecast. The coal that we supply to Stanwell constitutes the majority of the thermal coal production from Curragh. Our cost of supplying coal to Stanwell was greater than the price paid by Stanwell for the year ended December 31, 2021.

Under the CSA, we also share part of the revenue earned from export Met coal sales (from particular Tenements (as defined below)) with Stanwell through various rebates. The most material rebate is the export price rebate, which is linked to the realized export coal price for a defined Met coal product, as follows:

•For the first 7.0 MMtpa of export coal sales: when the 12-month trailing, weighted-average realized export coal price of Reference coal exceeds the Tier 1 Rebate Coal Floor Price, we pay a rebate of 25% of the difference between the realized export coal price and the Tier 1 Rebate Coal Floor Price.

•For export coal sales above 7.0 MMtpa: when the 12-month trailing, weighted-average realized export coal price of Reference coal exceeds the Tier 2 Rebate Coal Floor Price, we pay a rebate of 10% of the difference between the realized export coal price and the Tier 2 Rebate Coal Floor Price.

The CSA also provides for:

•a tonnage rebate to Stanwell per Mt on the first 7.0 MMtpa of export coal sales and on export coal sales above 7.0 MMtpa; and

•a rebate on run-of-mine, or ROM, coal mined in the Curragh “Pit U East Area.”

The total Stanwell rebate for the year ended December 31, 2021, was $55.4 million and has been included in the consolidated statements of operations included elsewhere in this Annual Report on Form 10-K.

The Supply Deed grants us the right to mine the coal reserves in the Stanwell Reserved Area, or the SRA. In exchange, we agreed to certain amendments to the CSA and to enter into a New Coal Supply Agreement, or the NCSA upon the expiration of the CSA (which is expected to occur in 2027). On July 12, 2019, we entered into the NCSA with Stanwell. From the earlier of the expiry of the CSA, the date of termination of the CSA, and January 1, 2029, we will continue to supply thermal coal to Stanwell under the NCSA. The term of the NCSA is expected to be 10 years, and Coronado will supply to Stanwell 2 million ‘Tonnes Equivalent’ of thermal coal per annum (based on a nominal gross calorific value of 25.6GJ) at a fixed contract price that varies in accordance with agreed formulae, inclusive of all statutory charges and royalties in respect of coal sold and delivered under

Coronado Global Resources Inc. Form 10-K December 31, 2021 15


Table of Contents

 

the NCSA. The export rebates which were payable under the CSA are not payable during the term of the NCSA. The supply term, the contract tonnage and the contract price under the NCSA are subject to adjustment in accordance with a financial model agreed between Stanwell and us. In summary, we have agreed that the total value of the discount received by Stanwell on coal supplied to it under the NCSA should (by the expiry date of the NCSA) be equal to the net present value of A$210 million as at the date of the Supply Deed. The net present value of the deferred consideration was $230.5 million as of December 31, 2021. On January 18, 2021, the Option Coal Supply Agreement, or the OCSA, contemplated by clause 5 of the NCSA was entered into, in respect of the supply of certain additional coal to Stanwell during the term of the NCSA.

See Item 1A. “Risk Factors—Risks related to the Supply Deed with Stanwell may adversely affect our financial condition and results of operations.”

Transportation

Coal produced at our mining properties is transported to customers by a combination of road, rail, barge and ship. See Item 2. “Properties” for descriptions of the transportation infrastructure available to each of our mining properties. Rail and port services are typically contracted on a long-term, take-or-pay basis in Australia, while these contracts are typically negotiated on a quarterly basis in the United States. See Item 7. “Management’s Discussion and Analysis of Financial Condition and Results of Operations—Liquidity and Capital Resources” for additional information on our take-or-pay obligations.

Australian Operations

Our Australian Operations typically sell export coal FOB, with the customer paying for transportation from the outbound shipping port. The majority of Curragh’s export Met coal is railed approximately 300 kilometers to the Port of Gladstone for export via two main port terminals, RG Tanna Coal Terminal, or RGTCT, and Wiggins Island Coal Export Terminal, or WICET. Curragh also has capacity available to stockpile coal at the Port of Gladstone. For sales of thermal coal to Stanwell, Stanwell is responsible for the transport of coal to the Stanwell Power Station.

Rail Services

Curragh is linked to the Blackwater rail line of the Central Queensland Coal Network, or CQCN, an integrated coal haulage rail system owned and operated by Aurizon Network Pty Ltd., or Aurizon Network. Curragh has secured annual rail haulage capacity of up to 12.0 MMtpa (plus surge capacity) under long-term rail haulage agreements with Aurizon Operations Limited, or Aurizon Operations, and Pacific National Holdings Pty Limited, or Pacific National.

The RGTCT Coal Transport Services Agreement with Aurizon Operations is for 8.5 MMtpa of haulage capacity to RGTCT. Curragh pays a minimum monthly charge (components of which are payable on a take-or-pay basis), which is calculated with reference to the below-rail access charges, haulage/freight charges, a minimum annual tonnage charge and other charges. The RGTCT Coal Transport Services Agreement terminates on June 30, 2030.

The Coal Transport Services Agreement with Pacific National is for 1.0 MMtpa of haulage capacity to RGTCT. Curragh pays a minimum monthly charge (components of which are payable on a take-or-pay basis), which is calculated with reference to the below-rail access charges, haulage/freight charges, a minimum annual tonnage charge and other charges. The Coal Transport Services Agreement with Pacific National terminates on July 31, 2029.

The Wiggins Island Rail Project, or WIRP, Transport Services Agreement with Aurizon Operations is for 2.0 MMtpa of capacity to WICET. This contract is effectively 100% take-or-pay (for a portion of the rail haulage and all capacity access charges). This agreement expires on June 30, 2030.

Port Services

Curragh exports coal through two terminals at the Port of Gladstone, RGTCT and WICET. At RGTCT, we and Gladstone Port Corporation Limited, or GPC, are parties to a coal handling agreement that expires on June 30, 2030. The agreement may be renewed at our request and, subject to certain conditions, GPC is required to agree

Coronado Global Resources Inc. Form 10-K December 31, 2021 16


Table of Contents

 

to the extension if there is capacity at RGTCT to allow the extension. We currently have the right to export between 7.7 MMtpa and 8.7 MMtpa at our nomination on a take-or-pay basis.

We have a minority interest in WICET Holdings Pty Ltd, whose wholly-owned subsidiary, Wiggins Island Coal Export Terminal Pty Ltd, or WICET Pty Ltd, owns WICET. Other coal producers who export coal through WICET also hold shares in WICET Holdings Pty Ltd. In addition, we and the other coal producers (or shippers) have take-or-pay agreements with WICET Pty Ltd and pay a terminal handling charge to export coal through WICET, which is calculated by reference to WICET’s annual operating costs, as well as finance costs associated with WICET Pty Ltd’s external debt facilities. Our take-or-pay agreement with WICET Pty Ltd, or the WICET Take-or-Pay Agreement, provides Curragh with export capacity of 1.5 MMtpa. The WICET Take-or-Pay Agreement is an “evergreen” agreement, with rolling ten-year terms. If we inform WICET Pty Ltd that we do not wish to continue to roll the term of the WICET Take-or-Pay Agreement, the term would be set at nine years and the terminal handling charge payable by us would be increased so that our proportion of WICET Pty Ltd’s debt is amortized to nil by the end of that nine-year term.

Under the WICET Take-or-Pay Agreement, we are obligated to pay for that capacity via terminal handling charges, whether utilized or not. The terminal handling charge payable by us can be adjusted by WICET Pty Ltd if our share of WICET Pty Ltd’s operational and finance costs increases, including because of increased operational costs or because another shipper defaults and has its capacity reduced to nil. The terminal handling charge is subject to a financing cap set out in the terminal handling charge methodology and has already been reached and is in force. If another shipper defaults under its take-or-pay agreement, each remaining shipper is effectively proportionately liable to pay that defaulting shipper’s share of WICET Pty Ltd’s costs going forward, in the form of increased terminal handling charges.

If we default under the WICET Take-or-Pay Agreement, we would be obligated to pay a termination payment to WICET Pty Ltd. The termination payment effectively represents our proportion of WICET Pty Ltd’s total debt outstanding, based on the proportion of our contracted tonnage to the total contracted tonnage of shippers at WICET at the time the payment is triggered. Shippers can also become liable to pay the termination payment where there is a permanent cessation of operations at WICET. Since WICET began shipping export tonnages in April 2015, four WICET Holdings Pty Ltd shareholders have entered into administration and Take-or-Pay Agreements subsequently terminated, resulting in the aggregate contracted tonnage of shippers decreasing from 27 MMtpa to 15.5 MMtpa.

Under the WICET Take-or-Pay Agreement, we are required to provide security (which is provided in the form of a bank guarantee). The amount of the security must cover our estimated liabilities as a shipper under the WICET Take-or-Pay Agreement for the following twelve-month period. If we are in default under the WICET Take-or-Pay Agreement and are subject to a termination payment, WICET Pty Ltd can draw on the security and apply it to amounts owing by us. See Item 1A. “Risk Factors—Risks related to our investment in WICET may adversely affect our financial condition and results of operations” and Item 7. “Management’s Discussion and Analysis of Financial Condition and Results of Operations—Liquidity and Capital Resources” for additional information on our take-or-pay obligations.

During 2019, Coronado entered into an Agreement with Washpool Coal Pty Ltd for assignment of their WICET capacity of 1.6 MMt per annum, on a take-or-pay basis for a term to June 30, 2022, at market rates.

U.S. Operations

Our U.S. Operations’ domestic contracts are generally priced FOR at the mine with customers bearing the transportation costs from the mine to the applicable end user. For direct sales to export customers, we hold the transportation contract and are responsible for the cost to the export facility, and the export customer is responsible for the transportation/freight cost from the export facility to the destination. A portion of our U.S. export sales are made through Xcoal and other intermediaries. For these sales, Xcoal or the intermediary typically take ownership of the coal as it is loaded into the railcar. The intermediary is responsible for the rail transportation and port costs.

Rail Services

Our U.S. Operations are served by Northfork Southern and CSX Transportation railroads. In 2021, we shipped approximately 95.4% of our total shipments via rail from our U.S. mining properties.

Coronado Global Resources Inc. Form 10-K December 31, 2021 17


Table of Contents

 

Northfork Southern railroad serves our Buchanan mining property and transports Buchanan’s coal to Lamberts Point Coal Terminal Pier 6 and to CNX Marine Terminal for export customers and to our domestic customers either directly or indirectly via inland river dock facilities where the coal is transloaded on to barges and then transported to the customer facilities.

CSX Transportation railroad serves our Logan and Greenbrier mining properties. CSX transports Logan and Greenbrier’s coal to Kinder Morgan Pier IX Terminal or CNX Marine Terminal or Dominion Terminal Associates (DTA) for export customers and either directly to the customers or to inland river dock facilities for domestic customers.

Port Services

Norfolk Southern’s Lamberts Point Coal Terminal Pier 6 is the largest coal loading facility in the Northern Hemisphere with 48 million tons of annual export capacity and is the main terminal at the Lamberts Point located in Norfolk, Virginia. Kinder Morgan’s Pier IX is a coal export terminal with an annual export capacity of 16 million tons located in the Port of Hampton Roads in Newport News, Virginia.

Our U.S. Operations have dedicated inventory capacity and a take or pay obligation to transload one million net tons per year through Kinder Morgan’s Pier IX Terminal, which expires at the end of March 2024. Our U.S. Operations also have alternate port access through CNX Marine Terminal which is a transshipping terminal at the Port of Baltimore owned by CONSOL Energy.

DTA Terminal is a coal export terminal located in the Port of Hampton Roads in Newport News, Virginia. DTA Terminal is 65% owned by Alpha Metallurgical Resources and 35% by Arch Coal and has annual export capacity of 22 MMt.

Kanawha River Terminal is a Norfolk Southern/CSX-served coal terminal located on the Ohio River at mile marker 314.5, Ceredo, West Virginia.

Suppliers

The principal goods we purchase in support of our mining activities are mining equipment, replacement parts, diesel fuel, natural gas, ammonium-nitrate and emulsion-based explosives, off-road tires, steel-related products (including roof control materials), lubricants and electricity. As a general matter, we have many well-established, strategic relationships with our key suppliers of goods and do not believe that we are dependent on any of our individual suppliers.

We also depend on several major pieces of mining equipment and facilities to produce and transport coal, including, but not limited to, longwall mining systems, continuous miners, draglines, dozers, excavators, shovels, haul trucks, conveyors, coal preparation plants, or CPPs, and rail loading and blending facilities. Obtaining and repairing these major pieces of equipment and facilities often involves long lead times. We strive to extend the lives of existing equipment and facilities through maintenance practices and equipment rebuilds in order to defer the requirement for larger capital purchases. We use our global leverage with major suppliers to ensure security of supply to meet the requirements of our active mines. See Item 2. “Properties” for more information about operations at our mining properties.

We use contractors and other third parties for exploration, mining and other services, generally, and are reliant on a number of third parties for the success of our current operations and the advancement of our development projects. See Item 1A. “Risk Factors—Our profitability could be affected adversely by the failure of suppliers and/or outside contractors to perform.”

Thiess Mining Services Contract

We currently use Thiess Pty Ltd, or Thiess, as our primary mining contractor for our Australian Operations.

We are party to a long-term mining contract with Thiess to provide hydraulic excavator overburden and coal mining, pit dewatering, run of mine rehandling services and maintenance of Coronado owned heavy mobile equipment at the Curragh North operation until December 31, 2025, referred to as Part A Services; and to provide rope shovel overburden removal using Coronado’s rope shovel and Thiess supplied ultra-class truck services

Coronado Global Resources Inc. Form 10-K December 31, 2021 18


Table of Contents

 

until March 31, 2022, referred to as Part B Services. We are currently working towards finalizing agreements with Thiess to take on management and operation of additional mining fleets, including the rope shovel and ultra-class trucks currently included in the Part B Services. These new agreements are expected to commence following the expiry of the Part B Services.

Competition

We operate in a competitive environment. We compete with domestic and international coal producers, traders and brokers. We compete on price, coal quality, transportation, optionality, reputation and reliability. Demand for Met coal and the prices that we will be able to obtain for our Met coal are highly competitive and are determined predominantly by world markets, which are affected by numerous factors, including: general global, regional and local economic activity; changes in demand for steel and energy; industrial production levels; short-term constraints, including weather incidents; changes in the supply of seaborne coal; technological changes; changes in international freight or other transportation infrastructure rates and costs; the costs of other commodities and substitutes for coal; market changes in coal quality requirements; government regulations which restrict, or increase the cost of, using coal; tariffs imposed by countries, including the United States and Australia, on the import of certain steel products and any retaliatory tariffs by other countries; and tax impositions on the resources industry, all of which are outside of our control. In addition, coal prices are highly dependent on the outlook for coal consumption in large Asian economies, such as China, Japan, South Korea and India, as well as any changes in government policy regarding coal or energy in those countries.

In developing our business plan and operating budget, we make certain assumptions regarding future Met coal prices, coal demand and coal supply. The prices we receive for our Met coal depend on numerous market factors beyond our control. Accordingly, some underlying coal price assumptions relied on by us may materially change and actual coal prices and demand may differ materially from those expected. Our business, operating and financial performance, including cash flows and asset values, may be materially and adversely affected by short- or long-term volatility in the prevailing prices of our products.

Competition in the coal industry is based on many factors, including, among others, world supply price, production capacity, coal quality and characteristics, transportation capability and costs, blending capability, brand name and diversified operations. We are subject to competition from producers in Australia, the United States, Canada, Russia, Mongolia and other coal producing countries. See Item 1A. “Risk Factors—We face significant competition, which could adversely affect profitability.”

Environmental Sustainability

We are focused on extracting high quality Met coal in an environmentally responsible way. Coal mining is one of the most environmentally regulated industries in the world, and it is vital that we consistently meet or exceed relevant regulatory standards.

We are subject to various environmental laws, regulations and public policies in Australia and the United States. Managing our environment and climate change risks is a key component of our corporate strategy and it is integrated into all stages and areas or our daily operations. We seek to minimize our environmental impact and ensure we meet or exceed our legislative and regulatory environmental obligations.

Coronado’s environmental sustainability initiatives and strategy are discussed further in our 2020 Sustainability Report, which can be found on our website at www.coronadoglobal.com/sustainability/. Nothing on our website, including our 2020 Sustainability Report or sections thereof, shall be deemed incorporated by reference into this Annual Report on Form 10-K. Our 2021 Sustainability Report is expected to be available in May 2022.

Climate change

While our operations are recognized as vital contributors to the communities and economies in which we operate, we acknowledge that our mining activities create greenhouse gas, or GHG, emissions. Climate change is one of the most significant issues for the steel industry and the industry has made significant reductions in GHG emissions by improving energy efficiency and using new technologies. Where possible, we are continuing to identify and implement GHG emissions and energy reduction opportunities across our business, whilst monitoring climate related risks and the sustainability of our operations. We are committed to working with other industry participants to support, develop and introduce new coal production and energy-generation technologies, that help reduce the environmental impact while continuing to meet global energy and steel demands.

Coronado Global Resources Inc. Form 10-K December 31, 2021 19


Table of Contents

 

Our Australian Operations disclose GHG scope 1 and 2 emissions annually to the Clean Energy Regulator under the National Greenhouse and Energy Reporting Scheme. Our U.S. Operations disclose GHG scope 1 and 2 emissions, including fugitive emissions (methane), for the facilities required to report their emissions annually to the United States Environmental Protection Agency.

Our operations are currently focused on implementing reporting improvements, identifying opportunities for reducing emissions intention on a per ton of production basis and benchmarking ourselves against our peer group prior to setting any emission reduction targets. We are also evaluating a range of potential projects that could have a positive impact on our emissions profile including assessing options for a “behind the meter” type solar farm and opportunities to harvest incidental coal seam gas (fugitive emissions - Scope 1) to either generate electric power on site at Curragh or to use as a partial replacement for diesel fuel.

Increased public concern may result in additional regulatory risks as new laws and regulations aimed at reducing GHG emissions come into effect in the jurisdictions in which we operate. Any legislation that limits or taxes GHG emissions could adversely impact our growth, increase our operating costs, or reduce demand for our coal.

With respect to physical climate risks, our operations may be impacted by weather-related events potentially resulting in lost production, supply chain disruptions and increased operating costs, which could have a material adverse impact on our financial results of operations.

On November 13, 2021, the Glasgow Conference of Parties 26, or COP26, agreed on the language around fossil fuels in the final Glasgow Climate Pact. A call on countries to “phase out” coal power was changed to “phase down of unabated coal power”, that is coal power that does not include the capture and storage of carbon dioxide emission. 190 countries have now agreed to phase down coal power. 65 countries have now committed to coal phase out, including more than 20 new commitments at COP26. 48 countries are members of the Powering Past Coal Alliance, or PPCA. All major coal financing countries have committed to end international coal finance by the end of 2021. As a result, Glasgow COP26 is expected to accelerate the trend of higher finance and insurance costs for coal miners and coal-fired power generators. The agreement on carbon accounting has also made global trade in carbon more likely, eventually accelerating the competitiveness of low-carbon solutions in the power and steel sectors.

Under the Paris Agreement, Australia must submit emissions reduction commitments known as Nationally Determined Contributions, or NDCs, which includes its national targets. Australia’s first NDC commitments are:

•2015 NDC: committed to reduce emissions by 26 to 28% below 2005 levels by 2030.

•2020 NDC update: affirmed the 2030 target, outlined Australia’s practical, technology-led approach to emission reductions, include new actions and measures since 2015.

•2021 NDC update: committed to net zero emissions by 2050, inscribed low emissions technology stretch goals, affirmed the 2030 target, and reported 2021 projections results showing Australia is on track to exceed this target by up to 9 percentage points.

Australia will submit its second NDC to the United Nations Framework Convention on Climate Change, or UNFCCC, in 2025.

Human Capital Disclosures

Our ability to attract and retain skilled, motivated and engaged employees is an essential part of our business. Investing in the skill and capabilities of our people will underwrite our long-term growth and sustainability. In both Australia and United States, we operate in regional locations with highly competitive labor markets. In each location, we are creating a high-performing workforce with a talent pipeline for future leaders, including succession planning for critical roles. To achieve this, we continue to create a culture that welcomes and values all people and where our core values of collaboration, accountability, respect and excellence are demonstrated in everything that we do.

We had 1,577 employees as of December 31, 2021. In addition, as of December 31, 2021, there were 1,848 contractors supplementing the permanent workforce, primarily at Curragh.

Coronado Global Resources Inc. Form 10-K December 31, 2021 20


Table of Contents

 

As of December 31, 2021, approximately 12% of our total employees, all at our Australian Operations, were covered by a single, federally-certified collective Enterprise Agreement, or the EA, for specified groups of mining and maintenance employees. The EA links us with; the Automotive, Food, Metals, Engineering, Printing and Kindred Industries Union; the Construction, Forestry, Maritime, Mining and Energy Union; the Communications, Electrical, Electronic, Energy, Information, Postal, Plumbing and Allied Services Union of Australia; and our employees performing mining and operational functions. In May 2019, the Australian Fair Work Commission approved the Curragh Mine Enterprise Agreement 2019. This EA has a nominal expiration date of May 26, 2022 and will remain in place until replaced or terminated by the Fair Work Commission. Our U.S. Operations employ a 100% non-union labor force.

Safety

Our employees and contractors are our most valuable assets and we consider their safety our number one priority. Safety is essential to all business functions and is never to be compromised, under any circumstance. The health and safety of our people is reinforced every day through our culture, behaviors, training, communication and procedures.

We manage safety and health through continuous improvement efforts and the implementation of practices and procedures that address safety risks in full compliance with the legal and regulatory frameworks of both the United States and Australia. We empower our people to consistently strive to have a safety mindset, and act by applying, managing and monitoring effective controls to prevent adverse outcomes with all activities and operations. Our programs are intended to reinforce our position that safety and health should always be front of mind for all employees and contractors. These programs are assessed on a regular basis to ensure they continue to be fit for purpose. We have robust training programs and strategic initiatives in place to ensure workers are informed about health and safety matters, including coal workers’ pneumoconiosis, or CWP, silicosis, hearing loss, and other occupational illnesses. In addition, we conduct sampling and health checks with our workers in line with health and safety legislative requirements.

We recognize that the mental health and wellbeing of our employees is equally as important as physical health and acknowledge that the pandemic has had a significant impact on the mental health of communities and societies across the world. In 2021, we introduced an Employee Assistance Program, or EAP, in the U.S. and increased the promotion of the EAP service in Australia which has been in operation for a number of years. Both programs offer employees and their families confidential and free counselling services

Safety performance is monitored through physical observations from both internal and external parties and through the reporting of key metrics. Safety performance is assessed monthly against internal goals and on a quarterly basis is benchmarked against our peers within the mining industry.

We set targets for safety interactions which is a process where employees observe a risk behavior and provide immediate feedback if it is deemed, or has the potential to be, unsafe. This is monitored by management daily through safety meetings, site visits, employee discussions, and management observations. The process allows for greater empowerment, innovation and employee input into the mining process.

On November 21, 2021, one of our employees at the Curragh mine, was fatally injured while working in the dragline operations. The Resources Safety & Health Queensland Inspectorate subsequently issued directives requiring isolation of the accident site and temporary suspension of dragline operations at Curragh until the Inspectorate and the Company were satisfied that these activities could recommence safely. Work at the mine recommenced gradually from November 24, 2021, following return to work safety sessions involving all workers on site. On December 10, 2021, the Inspectorate allowed dragline operations to recommence. We have complied with all requirements of the Inspectorate in relation to the incident.

The 12-month rolling average Total Reportable Injury Frequency Rate (“TRIFR”) as of December 31, 2021 for our Australian Operations was 3.07 and the Total Reportable Incident Rate (“TRIR”) for 12-month rolling average as of December 31, 2021 for our U.S. Operations was 2.51. As indicated in the graphs below, our Australian Operations outperformed the Queensland industry average in 2020 and 2021 and our U.S. Operations outperformed the U.S. national average in 2020 and 2021. We strive to ensure that we continue to provide a safe operating environment for all employees and contractors.

Coronado Global Resources Inc. Form 10-K December 31, 2021 21


Table of Contents

 

TRIFRAU

USTRIR

 

The safety and wellbeing of our workforce remains our highest priority and we continue to manage the potential threat of COVID-19 at our mines and offices. The Company’s COVID-19 Steering Committee, formed in 2020, has successfully monitored the effect of the pandemic across our Australian Operations and U.S. Operations and continues to implement proactive preventative measures to ensure the safety and well-being of employees and contractors. See “—COVID-19” above for more information.

Workforce composition and diversity

Our values (CARE – Collaboration, Accountability, Respect, Excellence) guide our policies, processes and actions as they relate to all workforce interactions and people related initiatives. As part of these values and to enable our people to excel within the workplace we are building a diverse and inclusive workforce, where unique viewpoints are heard, valued and respected. We believe this directly impacts the safety and productivity of our people. Our employees are trained to recognize and mitigate potential biases towards others. We continue to invest in training initiatives to challenge hiring managers’ unconscious bias and preconceptions. These initiatives have equipped our leaders with knowledge and tools to identify and challenge stereotypes and biased decision making. It also led to the review of policies and processes that may have inhibited the hiring and promotion of certain people. This included reviewing the wording used in job advertisements and challenging what has historically been regarded as essential experience to ensure that people entering the industry, or who have taken a career break, are not unintentionally disadvantaged.

We invest in training and development programs for both our new and long-serving employees. Investing in graduate recruitment, traineeships and internship programs through partnerships with leading education institutions has been central to accessing talent and building our brand. Further, our internal leadership development enhances succession planning and the transfer of skills and knowledge across our business.

As at December 31, 2021:

•in the United States, close to 9% of Senior Managers were female.

•in Australia, 28% of employees at a General Manager, Senior Manager and Senior Professional level were female, an increase of approximately 4% from December 31, 2020.

•in Australia, 33% of new employees were female.

•7% of our global workforce were female.

•61% of all employees were between the ages of 30 and 50 year.

We supported 2 of our female employees in Australia to participate in the Women’s Mentoring Program run by Women in Mining and Resources Queensland (WIMARQ). This program was created in response to identified demand for formal mentoring for women working in Queensland’s minerals and energy sectors and to improve retention and progression of women in our sector. It provides a structured, sustainable mentoring process that

Coronado Global Resources Inc. Form 10-K December 31, 2021 22


Table of Contents

 

supports women through career guidance and direction by sharing experiences, developing goals and forging exceptional mentoring relationships beyond the program’s duration.

Attracting and retaining the right people

We continued to focus our efforts on recruiting trainees and other entry level roles. We have also implemented the following initiatives:

•Comprehensive training, performance and leadership development programs.

•Competitive and flexible remuneration structure.

We have continuous improvement and feedback mindset in relation to further promoting employee engagement and motivation. Across our business there is concerted effort to develop leadership skills, foster and inclusive working environment, and assist managers improve engagement and productivity.

In 2021, our total rolling turnover rate was 27.9% and 18.4% and our voluntary departure rolling turnover rate was 17.3% and 15.4%, in Australia and the U.S., respectively. In 2020, our total rolling turnover rate was 14.3% and 36.5% and our voluntary departure rolling turnover rate was 8% and 11%, in Australia and the U.S., respectively.

Regulatory Matters—Australia

Our Australian Operations are regulated by the laws and regulations of the Commonwealth of Australia, or Cth, the State of Queensland, or Qld, and local jurisdictions. Most environmental laws are promulgated at the state level, but the Australian federal government has a role in approval of actions which have national environmental significance. In Queensland, the environmental laws relevant to coal mining include development legislation, pollution, waste, ecosystem protection, cultural heritage and native title land contamination and rehabilitation legislation. In addition, the Australian federal government regulates foreign investment and export approvals.

Tenements

We control the coal mining rights at Curragh under 14 coal and infrastructure mining leases, or MLs, and three mineral development licenses, or MDLs, granted pursuant to the Mineral Resources Act 1989 (Qld). We refer to the MLs and MDLs at Curragh, collectively, as the Tenements. Renewal of certain Tenements will be required during the mine life of Curragh and the Queensland government can vary the terms and conditions on renewal. There are a number of existing mining and petroleum tenements which overlap with the Tenements. The priority, consent and coordination requirements under the Mineral Resources Act 1989 (Qld), the Petroleum and Gas (Production and Safety) Act 2004 (Qld) and Mineral and Energy Resources (Common Provisions) Act 2014 (Qld) (as relevant) may apply with respect to those overlaps. Extensive statutory protocols govern the relationships between co-existing mining and exploration rights and these protocols are largely focused on encouraging the overlapping tenement holders to negotiate and formulate arrangements that enable the co-existence of their respective interests. See Item 2. “Properties” for more information regarding the Tenements.

Mineral Resources Act 1989 (Qld)

The Mineral Resources Act 1989 (Qld) and the Mineral and Energy Resources (Common Provisions) Act 2014 (Qld), together, provide for the assessment, development and utilization of mineral resources in Queensland to the maximum extent practicable, consistent with sound economic and land use management. The Mineral Resources Act 1989 (Qld) vests ownership of minerals, with limited exceptions, in the Crown (i.e., the state government). A royalty is payable to the Crown for the right to extract minerals. The Mineral Resources Act 1989 (Qld) creates different tenures for different mining activities, such as prospecting, exploring and mining. A ML is the most important tenure, as it permits the extraction of minerals in conjunction with other required authorities. The Mineral Resources Act 1989 (Qld) imposes general conditions on a ML.

A person who is the holder of a ML must keep the records necessary to enable the royalty payable by the person to be ascertained. The royalty payable on the value of coal sold, disposed of or used (post October 1, 2012) is as set out below:

Coronado Global Resources Inc. Form 10-K December 31, 2021 23


Table of Contents

 

•if the average price per Mt is A$100 or less: 7%;

•if the average price per Mt is more than A$100 but less than or equal to A$150: 7% on the first A$100 and 12.5% on the balance of the average price per Mt; and

•if the average price per Mt is A$150 or more: 7% on the first A$100, 12.5% on the next A$50 and 15% on the balance of the price per Mt.

The royalty payable for coal sold, disposed of or used in a return period is then calculated by multiplying the royalty rate by the value of the coal. Queensland Revenue Office Royalty Ruling MRA001.1 contains details on the costs that can (and cannot) be deducted when calculating the applicable royalty and the method for determining the value of the coal. Where there is a change in legislation or case law that affects the content of a royalty ruling, the change in the law overrides the royalty ruling—i.e., the Commissioner will determine the royalty liability in accordance with the changed law. See Item 2. “Properties” for a discussion of the royalties currently applicable to Curragh.

Mining Rehabilitation (Reclamation)

Mine closure and rehabilitation risks and costs are regulated by Queensland state legislation.

Amongst other things, an Environmental Authority Holder, or EA Holder, must provide the Queensland State Government with financial assurance for the purpose of drawing upon in the event that an EA Holder defaults on its obligations to rehabilitate the mine site.

The Mineral and Energy Resources (Financial Provisioning) Act 2018 (Qld), or the Financial Provisioning Act establishes a financial provisioning scheme, or the Scheme, from which the Department of Environment and Science, or the DES, sources funds to rehabilitate and remediate land subject to mining.

Under the Financial Provisioning Act, all mine operators are required to make a submission to the DES in respect of an Estimated Rehabilitation Cost, or ERC, for the mine site. The ERC is determined using the DES-approved ERC calculator. Using this information, the DES sets the ERC for the mine. The DES provides the ERC to the manager of the Scheme, or the Scheme Manager. The Scheme Manager undertakes a risk assessment of the mine, which is based upon independent advice from a scheme risk advisor. It includes detail on the mine operator’s financial soundness and credit rating, characteristics of the mining operation (e.g., life of mine, or LOM, and off-take agreements), rehabilitation history, environmental compliance history and the submission made by the company. Risk categories include high, moderate, low and very low. If the ERC and risk categories are set at moderate, low or very low for a mine, then there is a need to pay an annual contribution based on a small percentage of the ERC to the Scheme. If the category is high, then the operation provides a surety for the whole ERC and possibly a contribution to the Scheme. The risk assessment of the mine and, therefore, the amount of the contribution to the fund is assessed and paid annually in perpetuity, or until a clearance certificate is obtained.

Each year, the Scheme Manager is required to make an Annual Review Allocation to determine whether the mine will provide surety or pay a contribution to the Scheme depending on the value of the ERC relating to applicable environmental authorities, as follows:

1) ERC < A$100,000 - cash surety or bank guarantees

2) ERC = A$100,000 – A$450 million - pay a cash contribution into the Scheme

3) ERC > A$450 million - pay a cash contribution into the Scheme and provide bank guarantees.

 

Curragh has 2 environmental authorities, or EAs, which are covered by the Scheme, namely EA number EPML00643713 and EA number EPVX00635313. Under the transitional arrangements for the Scheme, Curragh’s existing financial assurance arrangements were deemed to be the ERC for both environmental authority number EPML00643713 and AE number EPVX00635313. In September 2020, Curragh applied for a new ERC in respect of EA number EPML00643713 which applies for the period from 3 November 2020 to 2 November 2022.

In October 2021, the Scheme Manager completed the assessment of the Annual Review Allocation for EA number EPML00643713 and issued an Annual Review Allocation of “Moderate”. The moderate rating resulted in Curragh being obliged to make a financial contribution to the Scheme of 2.75% of the ERC. In January 2022, the Scheme Manager completed an assessment of the Annual Review Allocation for EA number EPVX00635313

Coronado Global Resources Inc. Form 10-K December 31, 2021 24


Table of Contents

 

and issued an Annual Review Allocation of “High” in respect of MDL162 requiring Curragh to maintain its historical financial assurance in respect of 100% of the ERC for Environmental Authority Number EPVX00635313.

The Financial Provisioning Act also requires for a Progressive Rehabilitation and Closure Plan, or a PRCP, with respect to mined land. This requirement will be integrated into the existing EA processes for new mines, minimizing the regulatory burden on government and industry. All mining projects carried out under a ML that make a site-specific EA application will be required to provide a PRCP. If approved by the administering authority, a stand-alone PRCP schedule will be given to the applicant together with the EA. The PRCP schedule will contain milestones with completion dates for achieving progressive rehabilitation of the mine site. The Financial Provisioning Act provides transitional arrangements for three years for the application of the PRCP requirement to existing mines. The requirement for a PRCP commenced on November 1, 2019, or the PRCP start date, however all existing mining operations only transition into the PRCP framework once a transition notice is issued by the relevant government department. Curragh has been issued with a transition notice with respect to its PRCP and is required to submit the proposed PRCP to the administering authority by October 21, 2022.

Environmental Protection Act 1994 (Qld)

The primary legislation regulating environmental management of mining activities in Queensland is the Environmental Protection Act 1994 (Qld), or the EP Act. Its objective is to protect Queensland’s environment while allowing for development that improves the total quality of life, both now and in the future, in a way that maintains ecologically sustainable development. Under the EP Act, it is an offense to carry out a mining activity unless the person holds or is acting under an EA for the activity. The EA imposes conditions on a project. It is an offense to contravene a condition of an EA. In addition to the requirements found in the conditions of an EA, the holder must also meet its general environmental duty and duty to notify of environmental harm and otherwise comply with the provisions of the EP Act and the regulations promulgated thereunder. For example, the following are offenses under the EP Act:

•causing serious or material environmental harm;

•causing environmental nuisance;

•depositing proscribed water contaminants in waters and related matters; and

•placing contaminants where environmental harm or nuisance may be caused.

The EA holder must also be a registered suitable operator under the EP Act. We are a registered suitable operator.

We hold EA EPML00643713, which authorizes the mining of black coal, mineral processing, chemical storage, waste disposal and sewage treatment over the 14 MLs at Curragh on certain conditions. Those conditions include requirements in relation to air and water quality, regulated structures (e.g., dams), noise and vibration, waste, land use, rehabilitation and watercourse diversion.

We also hold a range of subsidiary EAs for our Australian Operations. See “—Mining Rehabilitation (Reclamation)” above for more information regarding the Financial Provisioning Act.

Aboriginal Cultural Heritage Act 2003 (Qld)

The Aboriginal Cultural Heritage Act 2003 (Qld) imposes a duty of care on all persons to take all reasonable and practicable measures to ensure that any activity conducted does not harm Aboriginal cultural heritage. Its object is to provide effective recognition, protection and conservation of Aboriginal cultural heritage.

We have obligations relating to Aboriginal cultural heritage with respect to a number of cultural heritage objects and areas located within the area of the Tenements. We work closely with the Aboriginal people to manage the cultural heritage objects, areas or evidence of archaeological significance, within our mining operations. We are party to a Cultural Heritage Management Plan (and associated Cultural Services Agreement) with the Gaangalu Nation People that applies to all of the Tenements. The plan establishes a coordinating committee and sets out the steps to be followed to manage activities that may impact Aboriginal cultural heritage.

Coronado Global Resources Inc. Form 10-K December 31, 2021 25


Table of Contents

 

Native Title Act 1993 (Cth)

The Native Title Act 1993 (Cth), or NTA, sets out procedures under which native title claims may be lodged and determined and compensation claimed for the extinguishment or impairment of the native title rights or interests of Aboriginal peoples. Its object is to provide for the recognition and protection of native title, to establish ways in which future dealings affecting native title may proceed and to set standards for those dealings, to establish a mechanism for determining claims to native title and to provide for, or permit, the validation of past acts, and intermediate period acts, invalidated because of the existence of native title.

With respect to MLs and MDLs granted under the Mineral Resources Act 1989 (Qld) on state land where native title has not been extinguished, a principle known as the non-extinguishment principle governs. Broadly, under this principle, native title rights are suspended while the mining tenure, as renewed from time to time, is in force. The grant (or renewal) of a mining tenure in respect of land where native title may exist must comply with the NTA to ensure the validity of the tenure. Registered native title claimants have certain notification, consultation and negotiation rights relating to mining tenures. Where native title is extinguished (i.e., freehold land), the NTA does not apply.

Regional Planning Interests

The Regional Planning Interests Act 2014 (Qld), or the RPI Act manages the impact of resource activities and other regulated activities in areas of the state that contribute, or are likely to contribute, to Queensland’s economic, social and environmental prosperity (e.g., competing land use activities on prime farming land). The RPI Act identifies areas of Queensland that are of regional interest, including strategic cropping areas and strategic environmental areas. Under the RPI Act, conducting a resource activity in an area of regional interest requires a regional interest development approval, unless operating under an exemption. Importantly, pre-existing mining activities being undertaken at the date of the introduction of the legislation are exempt.

We applied for and were granted a regional interest development approval for the “Curragh Expansion Project” (for ML700006, ML 700007 and ML700008), which is subject to regional interest conditions, such as mitigation. Certain protection conditions were also imposed on us with respect to our application for ML 80171 (which has since been granted). These include an obligation to provide mitigation in the event that strategic cropping land is impacted by future operations.

Environmental Protection and Biodiversity Conservation Act 1999 (Cth)

The Environment Protection and Biodiversity Conservation Act 1999 (Cth), or the EPBC Act, provides a federal framework to protect and manage matters of national environmental significance, such as listed threatened species and ecological communities and water resources. In addition, the EPBC Act confers jurisdiction over actions that have a significant impact on the environment where the actions affect, or are taken on, Commonwealth land, or are carried out by a Commonwealth agency.

Under the EPBC Act, “controlled actions” that have or are likely to have a significant impact on a matter of national environmental significance are subject to a rigorous assessment and approval process. A person must not take a “controlled action” unless approval is granted under the EPBC Act. Any person proposing to carry out an “action” that may be a “controlled action” must refer the matter to the Commonwealth Minister for a determination as to whether the proposed action is a controlled action.

On November 2, 2016, the Commonwealth Minister for the Department of the Environment and Energy administering the EPBC Act approved the extension of the existing Curragh mining area to include mining four additional Tenements—ML 700006, ML 700007, ML 700008 and ML 700009 (EPBC Act referral 2015/7508)—as a “controlled action,” on certain conditions. The conditions include requirements in relation to offsets and groundwater.

Mine Health and Safety

The primary health and safety legislation that applies to Curragh are the Coal Mining Safety and Health Act 1999 (Qld) and the Coal Mining Safety and Health Regulation 2001 (Qld), which we refer to, together, as the Coal Mining Safety Legislation.

Coronado Global Resources Inc. Form 10-K December 31, 2021 26


Table of Contents

 

Additional legislative requirements apply to operations that are carried on off-site or which are not principally related to coal mining (e.g., transport, rail operations, etc.). The Coal Mining Safety Legislation imposes safety and health obligations on persons who operate coal mines or who may affect the safety or health of others at coal mines. Under the Coal Mining Safety Legislation, the operator of a coal mine must, among other things:

•ensure that the risk to coal mine workers while at the operator’s mine is at an acceptable level;

•audit and review the effectiveness and implementation of the safety and health management system to ensure the risk to persons is at an acceptable level;

•provide adequate resources to ensure the effectiveness and implementation of the safety and health management system;

•ensure the operator’s own safety and health and the safety and health of others is not affected by the way the operator conducts coal mining operations;

•not carry out an activity at the coal mine that creates a risk to a person on an adjacent or overlapping petroleum authority if the risk is higher than an acceptable level of risk;

•appoint a site senior executive for the mine;

•ensure the site senior executive develops and implements a safety and health management system for all people at the mine;

•ensure the site senior executive develops, implements and maintains a management structure for the mine that helps ensure the safety and health of persons at the mine; and

•not operate the coal mine without a safety and health management system for the mine.

We recognize that health and safety are imperative to the ongoing success of our Australian Operations. As the operator at Curragh, we have in place a comprehensive safety and health management system, which includes an emergency response team, to address these legislative requirements. In accordance with the Coal Mining Safety Legislation we have also established an occupational hygiene baseline for dust exposure at Curragh.

Water Act 2000 (Qld)

In Queensland, all entitlements to the use, control and flow of water are vested in the state and regulated by the Water Act 2000 (Qld). Allocations under the Water Act 2000 (Qld) can be managed by a water supply scheme operator, such as SunWater Ltd, which is a Government-owned corporation regulated by the Queensland Competition Authority. We have purchased the required water allocations for Curragh and entered into a suite of related channel and pipeline infrastructure agreements and river supply agreements with SunWater Ltd to regulate the supply of water pursuant to these allocations. See Item 1A. “Risk Factors—In times of drought and/or shortage of available water, our operations and production, particularly at Curragh, could be negatively impacted if the regulators impose restrictions on our water offtake licenses that are required for water used in the CPPs.”

National Greenhouse and Energy Reporting Act 2007 (Cth).

The National Greenhouse and Energy Reporting Act 2007 (Cth) imposes requirements for both foreign and local corporations whose carbon dioxide production, greenhouse gas, or GHG, emissions and/or energy consumption meets a certain threshold to register and report GHG emissions and abatement actions, as well as energy production and consumption as part of a single, national reporting system. The Clean Energy Regulator administers the National Greenhouse and Energy Reporting Act 2007 (Cth), and the Department of Environment and Energy is responsible for related policy developments and review.

In accordance with the Emissions Reduction Fund Safeguard Mechanism under this legislation, Curragh has been assigned a baseline for its covered emissions and we must take steps to keep our emissions at or below the baseline or face penalties.

Coronado Global Resources Inc. Form 10-K December 31, 2021 27


Table of Contents

 

Labor Relations

Minimum employment entitlements, embodied in the National Employment Standards, apply to all private-sector employees and employers in Australia under the federal Fair Work Act 2009 (Cth). These standards regulate employment conditions and paid leave. Employees who are associated with the day-to-day operations of a local mine or mines and who are not located in head office or corporate administration offices are also covered by the Black Coal Mining Industry Award 2010 which regulates conditions including termination arrangements; pay and hours of work.

Unfair dismissal, enterprise bargaining, bullying claims, industrial actions and resolution of workplace disputes are also regulated under state and federal legislation. Some of the workers at Curragh are covered by the EA, which was approved by the Fair Work Commission, Australia’s national workplace relations tribunal. See “—Human Capital Disclosures” above.

Regulatory Matters—United States

Federal, state and local authorities regulate the U.S. coal mining industry with respect to matters such as employee health and safety, protection of the environment, permitting and licensing requirements, air quality standards, water pollution, plant and wildlife protection, the reclamation and restoration of mining properties after mining has been completed, the discharge of materials into the environment, surface subsidence from underground mining and the effects of mining on groundwater quality and availability. In addition, the industry is affected by significant requirements mandating certain benefits for current and retired coal miners. Numerous federal, state and local governmental permits and approvals are required for mining operations. Because of extensive and comprehensive regulatory requirements, violations during mining operations occur from time to time in the industry. The summary below is a non-exhaustive summary of material legislation that applies to our U.S. Operations. Although this summary focuses on federal laws, most states (including Virginia, West Virginia and Pennsylvania) have their own regulatory schemes that either mirror federal laws or create additional layers of regulation.

Clean Air Act of 1970

The U.S. Clean Air Act of 1970, or the CAA, regulates airborne pollution that may be potentially detrimental to human health, the environment or natural resources. The CAA and comparable state laws that govern air emissions affect U.S. coal mining operations both directly and indirectly.

Direct impacts on coal mining and processing operations may occur through the CAA permitting requirements and/or emission control requirements relating to particulate matter, or PM, nitrogen dioxide, ozone and sulfur dioxide, or SO2. For example, the U.S. Environmental Protection Agency, or the EPA, pursuant to the CAA, administers rules that apply PM emissions limits to emissions from coal preparation and processing plants constructed or modified after April 28, 2008. In addition, in recent years, the EPA has adopted more stringent national ambient air quality standards, or NAAQS for PM, nitrogen oxide, ozone and SO2. It is possible that these modifications as well as future modifications to NAAQS could directly or indirectly impact our mining operations in a manner that includes, but is not limited to, the EPA designating new areas of the country as being in nonattainment of applicable NAAQS or expanding existing nonattainment areas, and prompting additional local control measures pursuant to state implementation plans, or SIPs, required to address such revised NAAQS. SIPs may be state-specific or regional in scope. Under the CAA, individual states have up to 12 years from the date of designation of attainment/nonattainment areas to secure reductions from emission sources.

The CAA also indirectly, but significantly, affects the U.S. coal industry by extensively regulating the SO2, nitrogen oxides, mercury, PM, greenhouse gases, and other substances emitted by coal-burning facilities, such as steel manufacturers, coke ovens and coal-fired electric power generating facilities. Over time, the EPA has promulgated or proposed CAA regulations to impose more stringent air emission standards for a number of these coal-burning industries, especially the power generation sector. While the EPA under the Trump Administration moved toward repealing or loosening some of those regulations, it is unclear the extent to which the Trump Administration’s deregulatory changes for coal-burning facilities under the CAA will survive under the Biden Administration. This is particularly the case for greenhouse gas emissions from coal-fired electric generating facilities, as President Biden has called for bringing the U.S. power sector to zero greenhouse gas emissions by 2035. Collectively, CAA regulations and uncertainty around future CAA requirements could reduce the demand

Coronado Global Resources Inc. Form 10-K December 31, 2021 28


Table of Contents

 

for coal and, depending on the extent of such reduction, could have a material adverse effect on our business, financial condition and operations.

NAAQS Revisions. The CAA requires the EPA to periodically review and, if appropriate, revise the NAAQS to ensure protection of public health. In recent years, the EPA has reviewed the NAAQS for PM, ozone and SO2. The PM NAAQS was last revised and made more stringent in 2012. Individual states have developed SIPs, which detail the PM emission reductions their sources must meet in order for the state to maintain or achieve the 2012 PM NAAQS. On April 14, 2020, the EPA announced its intention to retain, without changes, the 2012 PM NAAQS. This action was finalized by EPA on December 18, 2020. On June 10, 2021, EPA announced that it would reconsider this decision in light of scientific evidence pointing to health issues caused by exposure to PM. EPA expects to issue a proposed rule with more stringent standards for PM in Summer 2022 and a final rule in Spring 2023.

In 2015, the EPA issued a final rule reducing the primary ozone NAAQS from 75 to 70 parts per billion but retaining the existing secondary ozone NAAQS. States with moderate or high nonattainment areas must submit SIPs for the 2015 ozone NAAQS by October 2021. Environmental and industry groups challenged the 2015 ozone NAAQS in the U.S. Court of Appeals for the D.C. Circuit. On August 23, 2019, the court denied all the petitions for review against the 2015 primary NAAQS but concluded that the EPA had not provided a sufficient rationale for its decision on the 2015 secondary NAAQS and remanded that standard to the EPA. Prior to the court’s decision, EPA initiated another periodic review of the ozone NAAQS. This most recent review culminated in a final rule by the EPA on December 31, 2020 to retain all aspects of the 2015 ozone NAAQS, including the secondary standard with additional rationale in response to the court’s 2019 decision. It remains to be seen whether there will be legal challenges to the December 2020 final rule, or whether the EPA will reconsider the rule under the new administration. More stringent ozone or PM NAAQS, if promulgated, would require new SIPs to be developed and filed with the EPA and may trigger additional control technology for mining equipment or coal-burning facilities, or result in additional challenges to permitting and expansion efforts. This could also be the case with respect to the implementation of any new requirements triggered by any future, more stringent NAAQS for nitrogen oxide and SO2, although the EPA promulgated a final rule on March 18, 2019 that retains, without revision, the existing NAAQS for SO2 of 75 parts per billion average over an hour.

Cross State Air Pollution Rule, or CSAPR. The CAA includes a so-called Good Neighbor Provision that requires upwind states to eliminate their significant contributions to downwind states’ nonattainment of the NAAQS. On July 6, 2011, the EPA finalized the CSAPR, which was meant to satisfy this Good Neighbor Provision. CSAPR requires the District of Columbia and 27 states from Texas eastward (not including the New England states or Delaware) to reduce power plant emissions that cross state lines and significantly contribute to ozone and/or fine particle pollution in downwind states. Following litigation in the D.C. Circuit and U.S. Supreme Court, the first phase of the nitrogen oxide and SO2 emissions reductions required by CSAPR commenced in January 2015; further reductions of both pollutants in the second phase of CSAPR became effective in January 2017.

On October 26, 2016, the EPA published the final CSAPR Update Rule to address implementation of the 2008 NAAQS for ground-level ozone. This rule imposed further reductions in nitrogen oxides emissions beginning in 2017 in 22 upwind states subject to CSAPR. According to the EPA, these reductions would reduce, but not eliminate, the upwind states’ significant contributions to downwind states’ air pollution. The CSAPR Update Rule did not include any deadline by which upwind states would have to completely eliminate their significant contributions to downwind states’ air pollution. The EPA maintained, however, that the rule would assist downwind states in bringing their areas of “moderate” nonattainment with the 2008 ozone NAAQS into compliance by the CAA-mandated July 20, 2018 deadline.

On December 6, 2018, the EPA followed up the CSAPR Update Rule with the CSAPR Close-Out. Pursuant to the CSAPR Close Out, the EPA found that it would not be feasible to impose cost-effective emissions on twenty upwind states before 2023, which was two years after the CAA-mandated 2021 deadline for states to bring their areas of “severe” nonattainment into compliance with the 2008 NAAQS. The EPA further concluded that the downwind states would achieve compliance with the 2008 NAAQS by 2023 even without further reductions by the upwind states, and the CSAPR Close-Out therefore required no further reductions from the upwind states beyond those required by the CSAPR Update Rule.

The CSAPR Update Rule and the CSAPR Close-Out were both challenged in the D.C. Circuit. On September 13, 2019, the D.C. Circuit found that upwind states had to eliminate any significant contributions to downwind states’ air pollution by the applicable 2008 NAAQS for ground-level ozone deadline, regardless of questions of

Coronado Global Resources Inc. Form 10-K December 31, 2021 29


Table of Contents

 

feasibility. Pursuant to the D.C. Circuit’s ruling, the CSAPR Update Rule was remanded to the EPA. On October 1, 2019, the D.C. Circuit issued a judgment vacating the CSAPR Close-Out on the same basis.

On October 15, 2020, EPA proposed the Revised CSAPR Update Rule, which fully addressed twenty-one states’ outstanding interstate pollution transport obligations for the 2008 NAAQS for ozone. For nine states, EPA found that their projected 2021 emissions do not significantly contribute to non-attainment and/or maintenance problems in downwind states. The remaining twelve states were found to contribute to the non-attainment and/or maintenance problems in downwind states. EPA proposed to issue new or amended Federal Implementation Plans requiring additional emissions reductions from electricity generating units in those states beginning in the 2021 ozone season. On March 15, 2021, EPA finalized a rule update that requires additional emissions reduction of nitrogen oxides from power plants in twelve states. Additional emission reduction requirements in these states could adversely affect the demand for coal.

Mercury and Air Toxic Standards, or MATS. The EPA published the final MATS rule in the Federal Register on February 16, 2012. The MATS rule revised the New Source Performance Standards, or NSPS, for nitrogen oxides, SO2 and PM for new and modified coal-fueled electricity generating plants, and imposed Maximum Achievable Control Technology, or MACT, emission limits on hazardous air pollutants, or HAPs, from new and existing coal-fueled and oil-fueled electricity generating plants. MACT standards limit emissions of mercury, acid gas HAPs, non-mercury HAP metals and organic HAPs. The rule provided three years for compliance with MACT standards and a possible fourth year if a state permitting agency determined that such was necessary for the installation of controls. Although the MATS rule has been and continues to be the subject of EPA review and litigation, it remains in effect and has contributed to the need for many coal-fired power plants to install addition pollution controls, convert to natural gas, or retire

Following issuance of the final MATS rule, numerous petitions for review were filed. After proceedings before the U.S. Court of Appeals for the D.C. Circuit, the U.S. Supreme Court on June 29, 2015 held that EPA interpreted the CAA unreasonably when it deemed cost irrelevant to the decision to regulate HAPs from new and existing coal-fueled and oil-fueled power plants. The Supreme Court remanded the case to the D.C. Circuit, which ultimately allowed the rule to remain in effect while EPA promulgated a series of supplemental findings on the costs and benefits of the rule in response to the Supreme Court’s ruling.

Most recently, on May 22, 2020, the EPA finalized a supplemental finding, or Supplemental Cost Finding, that health and environmental benefits not directly related to mercury pollution should not be included in the benefit portion of the analysis. Using this framework EPA found that the costs of the MATS rule “grossly outweigh” any possible benefits and, therefore, that that regulating HAPs from coal-fired and oil-fired power plants is not “appropriate and necessary” under the CAA. However, EPA determined that while it could revise the cost-benefit analysis for the MATS rule, it could not remove coal-fired plants from HAPs regulation. The MATS rule therefore remains in effect. EPA also determined in the Supplemental Cost Finding that the MATS rule is adequately protective of public health, as required by the CAA’s residual risk and technology review provisions. Westmoreland Mining Holdings, a coal company, filed a petition with the D.C. Circuit in May 2020 challenging the legality of the MATS rule. Health and medical groups and other industry groups filed a petition of review opposing the Supplemental Cost Finding, and its reversal of the previous finding that it was “appropriate and necessary” to regulate HAPs. Environmental groups also challenge the EPA’s residual risk and technology review of the MATS rule, arguing that more stringent standards are necessary. This litigation remains ongoing. While the vast majority of coal-fired power producers have already complied with the 2012 MATS rule standards, any future reductions in the standards due to the ongoing litigation or additional EPA action could increase the cost of coal-fired electric power generation and negatively impact the demand for coal.

Clean Power Plan and Affordable Clean Energy, or ACE. In 2014, the EPA proposed a sweeping rule, known as the “Clean Power Plan,” to cut carbon emissions from existing electricity generating units, including coal-fired power plants. A final version of the Clean Power Plan was adopted in August 2015. The Clean Power Plan aimed to reduce carbon dioxide emissions from electrical power generation by 32% by 2030 relative to 2005 levels through the reduction of emissions from coal-burning power plants and increased use of renewable energy and energy conservation methods. Under the Clean Power Plan, states were free to reduce emissions by various means and were to submit emissions reduction plans to the EPA by September 2016 or, with an approved extension, September 2018. If a state had not submitted a plan by then, the Clean Power Plan authorized the EPA to impose its own plan on that state. In order to determine a state’s goal, the EPA divided the country into three regions based on connected regional electricity grids. States were to implement their plans by focusing on (i) increasing the generation efficiency of existing fossil fuel plants, (ii) substituting lower carbon dioxide emitting

Coronado Global Resources Inc. Form 10-K December 31, 2021 30


Table of Contents

 

natural gas generation for coal-powered generation and (iii) substituting generation from new zero carbon dioxide emitting renewable sources for fossil fuel powered generation. States were permitted to use regionally available low carbon generation sources when substituting for in-state coal generation and to coordinate with other states to develop multi-state plans.

Following adoption, in 2015 twenty-seven states sued the EPA in the D.C. Circuit, claiming that the EPA overstepped its legal authority in adopting the Clean Power Plan. In February 2016, the U.S. Supreme Court ordered the EPA to halt enforcement of the Clean Power Plan until the lower court ruled on the lawsuit and until the Supreme Court determined whether or not to hear the case.

In a parallel litigation, twenty-five states and other parties filed lawsuits challenging the EPA’s final NSPS rules for carbon dioxide emissions from new, modified, and reconstructed power plants under the CAA. One of the primary issues in these lawsuits was the EPA’s establishment of standards of performance based on technologies including carbon capture and sequestration, or CCS. New coal plants could not meet the new standards unless they implement CCS. In conjunction with the EPA’s proposal to rescind the Clean Power Plan, the EPA also requested a stay of the NSPS litigation. The D.C. Circuit granted the request.

In October 2017, the EPA commenced rulemaking proceedings to rescind the Clean Power Plan, and in December 2017, the EPA published an Advanced Notice of Proposed Rulemaking announcing its intent to commence a new rulemaking to replace the Clean Power Plan with an alternative framework for regulating carbon dioxide. The rulemaking would culminate in the EPA replacing the Clean Power Plan with ACE. On September 17, 2019, the U.S. Court of Appeals for the D.C. Circuit dismissed the Clean Power Plan litigation and NSPS litigation as moot in light of the ACE rule.

On June 19, 2019, the EPA finalized the ACE rule as a replacement for the Clean Power Plan. The ACE rule establishes emission guidelines for states to develop plans to address greenhouse gas emissions from existing coal-fired power plants. The ACE rule has several components: a determination of the best system of emission reduction for greenhouse gas emissions from coal-fired power plants, a list of “candidate technologies” states can use when developing their plans, and new implementing regulations for emission guidelines under Section 111(d) of the CAA. Unlike the Clean Power Plan, the ACE rule only includes as candidate technologies those that increase the efficiency of individual emission units, also referred to as heat rate improvement measures; the ACE rule does not include other methods such as co-firing with natural gas or adding renewable generation facilities.

Upon finalization of the ACE rule, the rule was subject to a challenge in the D.C. Circuit in American Lung Association et al. v. EPA, et al. On January 19, 2021, the D.C. Circuit vacated the ACE rule and remanded the question of the “best system of emission reduction” for carbon dioxide emissions from existing power plants to EPA for further consideration. In reaching its decision, the court found that ACE would not be the most effective means of reducing emissions, and further rejected the idea that EPA is limited under the Clean Air Act to only regulate emissions reductions at the source. On February 22, 2021, the D.C. Circuit Court granted EPA’s motion to stay issuance of the mandate to repeal until EPA could respond to the remand in a new rulemaking action.

In addition to potential CAA regulatory changes, it is possible that other future international, federal and state initiatives to control greenhouse gas emissions could increase costs associated with coal production and consumption, such as costs for additional controls to reduce carbon dioxide emissions or costs to purchase emissions reduction credits to comply with future emissions trading programs. Future regulation in the United States could occur pursuant to future treaty commitments, new domestic legislation or regulation by the EPA. On February 19, 2021, the United States rejoined the international climate agreement reached at the United Nations Framework Convention on Climate Change in Paris, France during December 2015, also known as the Paris Agreement. President Trump previously withdrew the United States from the Paris Agreement, beginning a four-year exit process. In an executive order, President Biden directed that federal agencies review recent actions that the President believes may interfere with the United States’ participation in the Paris Agreement. While the Paris Agreement sets only voluntary pledges for reducing greenhouse gas emissions, the recent executive actions signal a shift toward consideration of new or more stringent federal regulations to further reduce greenhouse gas emissions in the United States. In addition, many states, regions and governmental bodies have already adopted their own greenhouse gas emission reduction initiatives and have or are considering the imposition of fees or taxes based on the such emission by certain facilities, including coal-fired electric generating facilities. Others have announced their intent to increase the use of renewable energy sources, with the goal of displacing coal and other fossil fuels. Federal legislation along these lines is also a possibility. Depending on

Coronado Global Resources Inc. Form 10-K December 31, 2021 31


Table of Contents

 

the particular regulatory programs or new laws enacted at the federal and state levels, the demand for coal could be negatively impacted, which would have an adverse effect on our operations.

There have also been numerous challenges to the permitting of new coal-fired power plants by environmental organizations and state regulators for concerns related to greenhouse gas emissions. For instance, various state regulatory authorities have rejected the construction of new coal-fueled power plants based on the uncertainty surrounding the potential costs associated with greenhouse gas emissions under future laws. In addition, several permits issued to new coal-fueled power plants without greenhouse gas emission limits have been appealed to the EPA's Environmental Appeals Board. A federal appeals court allowed a lawsuit pursuing federal common law claims to proceed against certain utilities on the basis that they may have created a public nuisance due to their emissions of carbon dioxide, while a second federal appeals court dismissed a similar case on procedural grounds. The United States Supreme Court overturned that decision in June 2011, holding that federal common law provides no basis for public nuisance claims against utilities due to their carbon dioxide emissions. The United States Supreme Court did not, however, decide whether similar claims can be brought under state common law. As a result, tort-type liabilities remain a concern. To the extent that these risks affect our current and prospective customers, they may reduce the demand for coal-fired power, and may affect long-term demand for coal.

Regional Haze. The EPA promulgated a regional haze program designed to protect and to improve visibility at and around Class I Areas, which are generally national parks, national wilderness areas and international parks. This program may restrict the construction of new coal-fired power plants, the operation of which may impair visibility at and around the Class I Areas. Additionally, the program requires certain existing coal-fired power plants to install additional control measures designed to limit haze-causing emissions, such as SO2, nitrogen oxide and PM. States were required to submit Regional Haze SIPs to the EPA in 2007; however, many states did not meet that deadline. In 2016, the EPA finalized revisions to the Regional Haze Rule which addresses requirements for the second planning period. In September 2019, the EPA issued final regional haze guidance that indicates that a re-evaluation of sources already subject to best available retrofit technologies is likely unnecessary. The guidance also encourages states to balance visibility benefits against other factors in selecting the measures necessary to make “reasonable progress” toward natural visibility conditions. Finally, when comparing various control options to determine which ones may be “cost-effective”, the final guidance recommends comparing cost to visibility benefits. SIPs will be required by July 31, 2021. If states adopt SIPs with more stringent requirements, demand for coal could be affected.

New Source Review, or NSR. Pursuant to NSR regulations, stationary sources of air pollution must obtain an NSR permit prior to beginning construction of a new “major” source of emissions or a “major” modification of an existing major source. If a project is determined to trigger NSR, Prevention of Significant Deterioration regulations require the project to implement Best Available Control Technology and/or Non-Attainment New Source Review Lowest Achievable Emission Rate control technology.

Beginning in the late 1990s, the EPA filed lawsuits against owners of many coal-fired power plants in the eastern U.S. alleging that the owners performed non-routine maintenance, causing increased emissions that should have triggered the application of these NSR standards. Some of these lawsuits have been settled with the owners agreeing to install additional emission control devices in their coal-fired power plants.

The remaining litigation and uncertainty around the NSR program rules could impact demand for coal. In recent years, EPA proposed and promulgated several revisions to its NSR regulations and policies concerning NSR permitting. For example, one such change, known as the Project Emissions Accounting Rule on October 22, 2020, revises the NSR regulations to clarify that recent emission decreases can be considered in part of the NSR applicability test. In addition, the EPA on November 14, 2018 issued a final rule that clarified the appropriate test for determining whether two nominally separate modifications to existing facilities should be considered in a single NSR applicability analysis. While these changes have the potential to reduce NSR permitting burdens for coal-fired power plants and other coal-burning facilities, their fate under the Biden Administration remains uncertain.

Coke Ovens. Coke Oven Batteries and Coke Ovens: Pushing, Quenching, and Battery Stacks are two source categories regulated by the CAA. The initial technology-based standards for Coke Oven Batteries were promulgated by EPA in 1993. In 2003, EPA issued technology-based standards for Coke Ovens: Pushing, Quenching, and Battery Stacks. In 2005, EPA revised the technology-based standards and issued risk-based standards following a residual risk review. On June 26, 2020, the United States District Court for the Northern District of California found EPA had violated its statutory duty to perform a technology review of its initial

Coronado Global Resources Inc. Form 10-K December 31, 2021 32


Table of Contents

 

technology-based standards for Coke Ovens: Pushing, Quenching, and Battery Stacks and a residual risk review of those standards. The court also found that EPA had violated its statutory duty to conduct a follow-up technology review and second residual risk review of the standards for Coke Oven Batteries. The court held that EPA has 30 months to comply with its statutory duty for these two source categories. To the extent that EPA ultimately promulgates more stringent technology-based standards as a result of the court-ordered technology and residual risk reviews, it could affect our current and prospective customers and may affect long-term demand for coal.

On January 21, 2021, President Biden issued an executive order that ordered the review of certain environmental regulations promulgated under the Trump administration. Those environmental regulations include ozone and particulate matter NAAQS, the ACE rule, and other air emission rules potentially affecting coal-fired power plants and other coal-burning facilities. It is unclear what affect this order will have on the demand for coal.

Clean Water Act of 1972

The U.S. Clean Water Act of 1972, or the CWA, and corresponding state law governs the discharge of toxic and non-toxic pollutants into the waters of the United States. CWA requirements may directly or indirectly affect U.S. coal mining operations.

Water Discharge. The CWA and corresponding state laws affect coal mining operations by imposing restrictions on discharges of wastewater into waters of the United States through the National Pollutant Discharge Elimination System, or NPDES, or an equally stringent program delegated to a state agency. The EPA and states may develop standards and limitations for certain pollutants, including through the technology-based standard program and water quality standard program. These restrictions often require us to pre-treat the wastewater prior to discharging it. NPDES permits require regular monitoring, reporting and compliance with effluent limitations. New requirements under the CWA and corresponding state laws may cause us to incur significant additional costs that could adversely affect our operating results.

Dredge and Fill Permits. Many mining activities, such as the development of refuse impoundments, fresh water impoundments, refuse fills, and other similar structures, may result in impacts to waters of the United States, including wetlands, streams and, in certain instances, man-made conveyances that have a hydrologic connection to such streams or wetlands. Under the CWA, coal companies are also required to obtain a Section 404 permit from the USACE prior to conducting certain mining activities, such as the development of refuse and slurry impoundments, fresh water impoundments, refuse fills and other similar structures that may affect waters of the United States, including wetlands, streams and, in certain instances, man-made conveyances that have a hydrologic connection to streams or wetlands. The USACE is authorized to issue general “nationwide” permits for specific categories of activities that are similar in nature and that are determined to have minimal adverse effects on the environment. Permits issued pursuant to Nationwide Permit 21, or NWP 21, generally authorize the disposal of dredged and fill material from surface coal mining activities into waters of the United States, subject to certain restrictions. Since March 2007, permits under NWP 21 were reissued for a five-year period with new provisions intended to strengthen environmental protections. There must be appropriate mitigation in accordance with nationwide general permit conditions rather than less restricted state-required mitigation requirements, and permit holders must receive explicit authorization from the USACE before proceeding with proposed mining activities. The USACE may also issue individual permits for mining activities that do not qualify for Nationwide Permit 21.

The CWR/Navigable Waters Protection, or NWPR. Recent regulatory actions and court decisions have created some uncertainty over the scope of CWA jurisdiction. On June 29, 2015, the EPA and the USACE jointly promulgated final rules, collectively known as the Clean Water Rule, or the CWR, redefining the scope of waters protected under the CWA, revising regulations that had been in place for more than 25 years. These rules expanded the scope of CWA jurisdiction, making discharges into more bodies of water subject to the CWA’s permitting and other requirements. Following the CWR’s promulgation, numerous industry groups, states, and environmental groups challenged the CWR. On October 9, 2015, the U.S. Court of Appeals for the Sixth Circuit stayed the CWR’s implementation nationwide, pending further action in court. Further, on February 28, 2017, President Trump signed an executive order directing the relevant executive agencies to review the CWR, and on July 27, 2017, the EPA and the USACE published a proposed rule to rescind the CWR. On January 22, 2018, the Supreme Court reversed the Sixth Circuit’s decision, ruling that jurisdiction over challenges to the CWR rests with the federal district courts and not with the appellate courts, which was followed by the dissolution of the stay by the Sixth Circuit, and on February 6, 2018, in response to the January 2018 Supreme Court decision, the agencies published a final rule to postpone the adoption of CWR and maintain the status quo (the pre-2015 rule)

Coronado Global Resources Inc. Form 10-K December 31, 2021 33


Table of Contents

 

through February 6, 2020 pending the agencies’ review of the CWR. Multiple states and environmental groups have filed challenges to this delay. On August 16, 2018, the federal court in South Carolina enjoined the February 6, 2018 rule, effectively reinstating the CWR in Virginia and Pennsylvania (where we have operations) and in 24 other states. The injunction is being challenged on appeal.

On April 21, 2020, the EPA and the USACE published the Navigable Waters Protection Rules, or the NWPR. The NWPR revises the definition of waters of the United States and replaces the CWR. The NWPR shrinks the agencies’ jurisdiction, particularly as it relates to tributaries and adjacent waters. The NWPR went into effect on June 22, 2020. The NWPR was enjoined in Colorado, but this decision was overturned by the Tenth Circuit Court of Appeals. On December 7, 2021, the EPA and the USACE announced a proposed rule to revise the definition of “waters of the United States.” The new definition would reflect the pre-2015 definition as well as consideration of recent Supreme Court decisions.

On April 22, 2020, in an unrelated case the Supreme Court ruled that provisions of the CWA require an NPDES permit when there is a direct discharge from a point source to navigable waters or the functionally equivalent discharge to groundwater. The NWPR, however, had excluded groundwater from the agencies’ jurisdiction. On January 21, 2021, EPA issued guidance applying the ruling of the Supreme Court to the NPDES permitting program. Under the Biden Administration, the EPA rescinded this guidance memorandum, thus eliminating a new factor that likely would have reduced clean water protections.

The Department of Justice has filed motions in various federal courts asking for remand of the NWPR back to the EPA and the USACE. Litigation of this matter remains ongoing. Uncertainty surrounding the NWPR remains, including what impact it may have on our operations.

Effluent Limitations Guidelines for the Steam Electric Power Generating Industry. On September 30, 2015, the EPA published a final rule setting new or additional requirements for various wastewater discharges from steam electric power plants. The rule set zero discharge requirements for some waste streams, as well as new, more stringent limits for arsenic, mercury, selenium and nitrogen applicable to certain other waste streams. On April 12, 2019, the U.S. Court of Appeals for the Fifth Circuit agreed with environmental groups that the portions of the rule regulating legacy wastewater and residual combustion leachate are unlawful. The Court vacated those portions of the rule.

On August 31, 2020, the EPA finalized a rule to revise the guidelines and standards for the steam electric power generating point source category applicable to two categories of wastewater streams regulated by the 2015 rule: flue gas desulfurization wastewater, or FGD, and bottom ash transport water, or BA. With respect to FGD, selenium standards are less stringent than under the 2015 rule, and certain types of facilities, such as facilities with high FGD flow, low utilization boilers and those set to retire coal combustion units, are subject to less stringent effluent limits. The compliance deadline for FGD technology-based wastewater limits was extended from December 31, 2023 to December 31, 2025. With respect to BA, the EPA, among other things, eliminated a strict no-discharge requirement and implemented a not-to-exceed ten-percent volumetric purge. We cannot at this time predict how this rule will be enforced by the new Biden administration or if it will seek a revision.

The Biden Administration’s January 20, 2021 executive order for review of environmental regulations indicated the Biden Administration would review the NWPR amongst other CWA-related regulations.

Surface Mining Control and Reclamation Act of 1977

The Surface Mining Control and Reclamation Act of 1977, or the SMCRA, which is administered by the U.S. Office of Surface Mining Reclamation and Enforcement, or OSM, establishes operational, reclamation and closure standards for all aspects of surface mining and many aspects of underground mining in the United States. Unlike the CAA and the CWA, SMCRA is primarily concerned with the holistic regulation of coal mining as an industry. Its general environmental standards require surface operations to mine in such a way as to “maximize the utilization and conservation” of coal while using the best technology currently available to minimize land disturbance and adverse impacts on wildlife, fish, and environmental values. SMCRA requires operators to accomplish these goals by restoring the land to its approximate pre-mining condition and contour.

The SMCRA implements its environmental standards through “cooperative federalism.” Under the SMCRA, a state may submit a qualifying surface mining regulatory scheme to the OSM, and request to exert exclusive jurisdiction over surface mining activities within its territory. If OSM finds that the state’s scheme meets SMCRA’s

Coronado Global Resources Inc. Form 10-K December 31, 2021 34


Table of Contents

 

requirements and gives approval, the state becomes the primary regulatory authority with oversight from OSM. If a state has a surface mining regulatory scheme that is less stringent than the surface mining standards under SMCRA and OSM regulations, or if mining on federal lands is involved, the OSM will impose federal regulations on surface mining in that state. Each of Virginia, West Virginia and Pennsylvania, where our Buchanan, Logan, Greenbrier and Mon Valley operations are based, has adopted qualifying surface mining regulatory schemes and has primary jurisdiction over surface mining activities within their respective territories. However, even if a state gains approval for its surface mining regulatory program, the OSM retains significant federal oversight, including the ability to perform inspections of all surface mining sites to ensure state program and mine operator compliance with federal minimum standards. The OSM and its state counterparts also oversee and evaluate standards of:

•performance (both during operations and during reclamation);

•permitting (applications must describe the pre-mining environmental conditions and land use, the intended mining and reclamation standards, and the post-mining use);

•financial assurance (SMCRA requires that mining companies post a bond sufficient to cover the cost of reclaiming the site, and the bond is not released until mining is complete, the land has been reclaimed and the OSM has approved the release);

•inspection and enforcement (including the issuance of notices of violation and the placement of a mining operation, its owners and controllers on a federal database known as the Applicant Violator System, meaning that such person or entity is blocked from obtaining future mining permits); and

•land restrictions (SMCRA prohibits surface mining on certain lands and also allows citizens to challenge surface mining operations on the grounds that they will cause a negative environmental impact).

Regulations under the SMCRA and its state analogues provide that a mining permit or modification can, under certain circumstances, be delayed, refused or revoked if we or any entity that owns or controls us or is under common ownership or control with us have unabated permit violations or have been the subject of permit or reclamation bond revocation or suspension.

Under the SMCRA and its state law counterparts, all coal mining applications must include mandatory “ownership and control” information, which generally includes listing the names of the operator’s officers and directors, and its principal stockholders owning 10% or more of its voting shares, among others. Ownership and control reporting requirements are designed to allow regulatory review of any entities or persons deemed to have ownership or control of a coal mine, and bar the granting of a coal mining permit to any such entity or person (including any “owner and controller”) who has had a mining permit revoked or suspended, or a bond or similar security forfeited within the five-year period preceding a permit application or application for a permit revision. Similarly, regulatory agencies also block the issuance of permits to applicants, their owners or their controlling persons, who have outstanding permit violations that have not been timely abated.

These regulations define certain relationships, such as owning over 50% of stock in an entity or having the authority to determine the manner in which the entity conducts mining operations, as constituting ownership and control. Certain other relationships are presumed to constitute ownership or control, including among others, the following:

•being an officer or director of an entity;

•being the operator of the coal mining operation;

•having the ability to commit the financial or real property assets or working resources of the permittee or operator; and

•owning of record 10% or more of the mining operator.

This presumption, in some cases, can be rebutted where the person or entity can demonstrate that it in fact does not or did not have authority directly or indirectly to determine the manner in which the relevant coal mining operation is conducted.

Coronado Global Resources Inc. Form 10-K December 31, 2021 35


Table of Contents

 

We must file an ownership and control notice each time an entity obtains a 10% or greater interest in us. If we or entities or persons deemed to have ownership of control of us have unabated violations of SMCRA or its state law counterparts, have a coal mining permit suspended or revoked, or forfeit a reclamation bond, we and our owners and controllers may be prohibited from obtaining new coal mining permits, or amendments to existing permits, until such violations or other matters are corrected. This is known as being “permit-blocked.” Additionally, if an owner or controller of us is deemed an owner or controller of other mining companies, we could be permit-blocked based upon the violations of, or permit-blocked status of, an owner or controller of such other mining companies. If our owner or controller were to become permit blocked, this could adversely affect production from our properties.

In recent years, the permitting required for coal mining has been the subject of increasingly stringent regulatory and administrative requirements and extensive activism and litigation by environmental groups. After a permit application is prepared and submitted to the regulatory agency, it goes through a completeness and technical review. Public notice of the proposed permit is given for a comment period before a permit can be issued. Regulatory authorities have considerable discretion in the timing of the permit issuance and the public has the right to comment on and otherwise engage in the permitting process, including public hearings and through intervention in the courts. Monetary sanctions and, in certain circumstances, even criminal sanctions may be imposed for failure to comply with the SMCRA permits. Before a SMCRA permit is issued, a mine operator must submit a bond or other form of financial security to guarantee the performance of reclamation bonding requirements.

SMCRA provides for three categories of bonds: surety bonds, collateral bonds and self-bonds. A surety bond is an indemnity agreement in a sum certain payable to the regulatory authority, executed by the permittee as principal and which is supported by the performance guarantee of a surety corporation. A collateral bond can take several forms, including cash, letters of credit, first lien security interest in property or other qualifying investment securities. A self-bond is an indemnity agreement in a sum certain executed by the permittee or by the permittee and any corporate guarantor made payable to the regulatory authority. For our U.S. Operations, we meet our reclamation bonding requirements by posting surety bonds and participation in the Commonwealth of Virginia bond pool. Our total amount of reclamation surety bonds outstanding was approximately $28.5 million as of December 31, 2021. The surety bond requirements for a mine represent the calculated cost to reclaim the current operations if it ceased to operate in the current period. The cost calculation for each surety bond must be completed according to the regulatory authority of each state.

The SMCRA Abandoned Mine Land Fund requires a fee on all coal produced in the United States. The proceeds are used to rehabilitate lands mined and left unreclaimed prior to August 3, 1977 and to pay health care benefit costs of orphan beneficiaries of the Combined Fund created by the Coal Industry Retiree Health Benefit Act of 1992. The fee amount can change periodically based on changes in federal legislation. Pursuant to the Tax Relief and Health Care Act of 2006, from October 1, 2012 through September 30, 2021, the fee is $0.31 and $0.13 per Mt of surface-mined and underground-mined coal, respectively. See Item 2. “Properties” for information regarding reclamation and other taxes applicable to our U.S. mining properties.

While SMCRA is a comprehensive statute, SMCRA does not supersede the need for compliance with other major environmental statutes, including the Endangered Species Act of 1973, or the ESA, CAA, CWA, the Resource Conservation and Recovery Act of 1976, or the RCRA, and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, or CERCLA.

National Environmental Policy Act of 1969

The National Environmental Policy Act of 1969, or NEPA, applies to mining operations or permitting requirements that require federal approvals, NEPA requires federal agencies to evaluate the environmental impact of all “major federal actions” significantly affecting the quality of the human environment. NEPA requires federal agencies, such as the EPA or the OSM, to incorporate environmental considerations in their planning and decision-making. The federal agency carrying out the requirements of NEPA must prepare a detailed statement assessing the environmental impact of and alternatives to the particular action requiring agency approval. These statements are referred to as Environmental Impact Statements or Environmental Assessments. NEPA also defines the processes for evaluating and communicating environmental consequences of federal decisions and actions, such as the permitting of new mine development on federal lands. U.S. coal mining companies must provide information to agencies with respect to proposed actions that will be under the authority of the federal

Coronado Global Resources Inc. Form 10-K December 31, 2021 36


Table of Contents

 

government. The NEPA process involves public participation and can involve lengthy timeframes. Ultimately, federal agencies may require mitigation measures pursuant to their NEPA review.

On July 16, 2020, the White House Council on Environmental Quality, or the CEQ finalized a proposed rule, which went into effect on September 14, 2020. The new rule made it easier to obtain approval for new projects, including by eliminating the need to evaluate so-called cumulative impacts which could ultimately limit agencies’ consideration of climate change and greenhouse gas emissions. However, pursuant to Executive Order 13990, CEQ began a comprehensive review of the 2020 rule and announced a phased approach to amending NEPA regulations. An Interim Final Rule was issued June 29, 2021 which extended the deadline for Federal agencies to develop or update their NEPA implementing procedures to conform to the CEQ regulations by two years.

Solid Waste Disposal Act of 1995 and Resource Conservation and Recovery Act of 1976

The Solid Waste Disposal Act of 1965, or SWDA, was the first federal act to target waste disposal technology. The SWDA governs disposal of both municipal and industrial waste, promotes advancement of waste management technology and sets waste management standards. The SWDA was amended by the Resource Conservation and Recovery Act of 1976, or RCRA. RCRA affects U.S. coal mining operations by establishing “cradle to grave” requirements for the generation, transportation, treatment, storage and disposal of solid and hazardous wastes. The RCRA also addresses the environmental effects of certain past hazardous waste treatment, storage and disposal practices, and may require a current or past site owner or operator to remove improperly disposed hazardous wastes. The RCRA also sets forth a framework for managing certain non-hazardous solid wastes. Part or all of the RCRA program may be delegated to a state pursuant to a state implementation plan if the state standards are at least as stringent as federal standards.

Subtitle C of the RCRA exempted fossil fuel combustion wastes from hazardous waste regulation until the EPA completed a report to Congress and made a determination on whether the wastes should be regulated as hazardous. On December 19, 2014, the EPA announced the final rule on disposal of coal combustion residuals, or CCR or coal ash, by electric utilities and independent power producers. As finalized, the rule continues the exemption of CCR from regulation as a hazardous waste, but does impose new requirements at existing CCR surface impoundments and landfills that will need to be implemented over a number of different time-frames in the coming months and years, as well as at new surface impoundments and landfills. On August 24, 2018, the U.S. Court of Appeals for the D.C. Circuit held that certain provisions of the EPA’s CCR rule were not sufficiently protective, and it invalidated those provisions. Since then, the EPA has finalized changes to its CCR regulations in response to some aspects of the court’s ruling, primarily to regulate unlined ponds but extend certain deadlines for initiating their closure, and allowing site-specific alternate liner determinations.

The Biden Administration’s January 20, 2021 executive order for review of environmental regulations indicated that the Biden Administration will review environmental regulations affecting the management and disposal of CCR. On January 11, 2022, the EPA announced that it was taking steps to protect groundwater from coal ash contamination, including plans to finalize a federal permitting program for the disposal of coal ash and establishing regulations for legacy coal ash surface impoundments. We cannot predict at this time if and/or when such rules will go into effect.

The EPA regulations on CCR management and disposal exempt coal ash that is disposed of at mine sites and reserve any regulation thereof to the Office of Surface Mining Reclamation and Enforcement or "OSMRE." After proposing CCR regulations in 2007, the OSMRE suspended all rulemaking actions on CCRs, but could re-initiate them in the future. In addition, while many mining wastes such as overburden and coal cleaning wastes are exempt from RCRA hazardous waste regulations, certain wastes may be subject to the RCRA’s requirements. The RCRA also governs underground storage tanks containing hazardous substances and petroleum products, which are used in some coal mining operations, although we do not have underground storage tanks associated with our U.S. Operations.

The Biden Administration’s January 20, 2021 executive order for review of environmental regulations indicated that the Biden Administration will review environmental regulations affecting the management and disposal of CCR. It is unclear what effect this order will have on the demand for coal.

Coronado Global Resources Inc. Form 10-K December 31, 2021 37


Table of Contents

 

Comprehensive Environmental Response, Compensation, and Liability Act of 1980

Comprehensive Environmental Response, Compensation and Liability Act of 1980, or CERCLA, authorizes the federal government and private parties to recover costs to address threatened or actual releases of hazardous substances (broadly defined) that may endanger public health or the environment. Current owners and operators of contaminated sites, past owners and operators of contaminated sites at the time hazardous substances were disposed, parties that arranged for the disposal or transport of the hazardous substances and transporters of hazardous substances could be potentially responsible parties, or PRPs, under CERCLA. PRPs may be liable for costs related to contaminated sites, including, but not limited to, site investigation and cleanup costs incurred by the government or other parties, damages to natural resources and costs of certain health assessments or studies. In addition, CERCLA authorizes the federal government to order PRPs to conduct investigation and cleanup of releases of hazardous substances at certain contaminated sites.

CERCLA requires that a list of contaminated sites, referred to as the National Priorities List, be compiled by EPA using certain criteria to evaluate the potential relative risk to the public health and the environment from releases or threatened releases of hazardous substances. Strict, joint and several and retroactive liability may be imposed on hazardous substance generators and facility owners and operators, regardless of fault or the legality of the original disposal activity. The failure to comply with a federal government order under CERCLA may result in civil penalties, including fines and/or punitive damages, in addition to the costs incurred by the federal government due to the party’s failure to comply with an order.

We could face liability under CERCLA and similar state laws for properties that (1) we currently own, lease or operate, (2) we, our predecessors, or former subsidiaries have previously owned, leased or operated, (3) sites to which we, our predecessors or former subsidiaries, sent waste materials, and (4) sites at which hazardous substances from our facilities’ operations have otherwise come to be located.

Federal Mine Safety and Health Act of 1977

The Mine Act, which was amended by the Mine Improvement and New Emergency Response Act of 2006, or the MINER Act, governs federal oversight of mine safety and authorizes the U.S. Department of Labor’s Mine Safety and Health Administration, or MSHA, to regulate safety and health conditions for employees working in mines within the United States, and to enforce various mandatory health and safety requirements. The Mine Act mandates four annual inspections of underground coal mines, two annual inspections of all surface coal mines, and permits inspections in response to employee complaints of unsafe working conditions. The statute and its regulations also mandate miner training, mine rescue teams for all underground mines, and involvement of miners and their representatives in health and safety activities. MSHA has also promulgated regulations governing a wide range of activities, including roof support, ventilation, combustible materials, electrical equipment, fire protection, explosives and blasting, and mine emergencies. MSHA has the statutory authority to issue civil penalties for non-compliance, to set the period for abatement of violations, and to seek injunctive relief requiring a company to cease operations until certain conditions are corrected. The MINER Act requires mine specific emergency response plans in underground coal mines, implemented new regulations regarding mine rescue teams and sealing of abandoned areas, requires prompt notification of mine accidents, and imposes enhanced civil and criminal penalties for violations. Various states also have enacted their own new laws and regulations addressing many of these same subjects. MSHA continues to interpret and implement various provisions of the MINER Act, along with introducing new proposed regulations and standards. For example, the second phase of MSHA’s respirable coal mine dust rule went into effect in February 2016 and requires increased sampling frequency and the use of continuous personal dust monitors. In August 2016, the third and final phase of the rule became effective, reducing the overall respirable dust standard in coal mines from 2.0 to 1.5 milligrams per cubic meter of air. In the last several years, MSHA has also proposed regulations governing respirable silica, and the exposure of miners to underground diesel exhaust fumes, and testing, evaluation, and approval of electric motor-driven mine equipment and accessories. MSHA has issued guidance for employers and workers regarding how to mitigate the risks of COVID-19 rather than mandatory standards. During a September 29, 2021 stakeholder call, MSHA leadership indicated that it would not issue an Emergency Temporary Standard requiring COVID-19 vaccinations or testing at mine sites.

Black Lung (Coal Worker’s Pneumoconiosis)

The Mine Act amended the Federal Coal Mine Health and Safety Act of 1969, which is the legislation that mandates compensation for miners who were totally and permanently disabled by the progressive respiratory

Coronado Global Resources Inc. Form 10-K December 31, 2021 38


Table of Contents

 

disease caused by coal workers’ pneumoconiosis, or black lung. Under current federal law, a U.S. coal mine operator must pay federal black lung benefits and medical expenses to claimants who are current employees, and to claimants who are former employees who last worked for the operator after July 1, 1973, and whose claims for benefits are allowed. Coal mine operators must also make payments to a trust fund for the payment of benefits and medical expenses to claimants who last worked in the coal industry prior to July 1, 1973. The trust fund is funded by an excise tax on sales of U.S. production, excluding export sales, of up to $1.21 per Mt for deep-mined coal and up to $0.61 per Mt for surface-mined coal, each limited to 4.4% of the gross sales price. In 2019, these tax rates were cut in half compared to the pre-2019 level, falling to $0.61 per Mt of underground-mined coal or $0.31 per Mt of surface-mined coal, limited to 2% of the sales price. Our total excise taxes paid to this trust fund in 2020 were $0.9 million. In December 2019, President Trump signed into law a provision that restored the rate to its pre-2019 level through December 31, 2020. On December 27, 2020, then-President Trump extended the trust fund excise tax through December 31, 2021 at the pre-2019 rate. Historically, very few of the miners who sought federal black lung benefits were awarded these benefits; however, the approval rate has increased following implementation of black lung provisions contained in the Patient Protection and Affordable Care Act of 2010, or the Affordable Care Act. The Affordable Care Act introduced significant changes to the federal black lung program, including an automatic survivor benefit paid upon the death of a miner with an awarded black lung claim, and established a rebuttable presumption with regard to pneumoconiosis among miners with 15 or more years of coal mine employment that are totally disabled by a respiratory condition. These changes could have a material impact on our costs expended in association with the federal black lung program. In addition to possibly incurring liability under federal statutes, we may also be liable under state laws for black lung claims. See Note 20 to the accompanying audited consolidated financial statements for further information of applicable insurance coverage.

National Labor Relations Act of 1935

The National Labor Relations Act of 1935, or the NLRA, governs collective bargaining and private sector labor and management relations. While we do not have a unionized workforce in the United States, to the extent that non-supervisory employees decide to seek representation or engage in other protected concerted labor activities, the NLRA and the rules promulgated by the National Labor Relations Board, or NLRB, set the parameters for employees’ and union activity and our response. The NLRA applies to both unionized and non-union workforces. Any employee complaints related to the pandemic and any related labor actions, if they are tied to terms and conditions of employment that affect the workforce generally, will be governed by the NLRA. In addition, recent NLRB- promulgated rules regarding joint employer status under the NLRA clarified the basis upon which contractors and vendors, as well as their employees (and the unions representing them), could allege that we are jointly and severally liable for any unfair labor practices or bargaining obligations of the third-party employer. While the rules made the joint employer test generally more employer-friendly, there is always the possibility of claims that we are a joint employer with a contractor or vendor.

Patient Protection and Affordable Care Act of 2010

The United States Patient Protection and Affordable Care Act, or the Affordable Care Act, was enacted in March 2010 and included substantial reforms to the U.S. health care system intended to increase affordability of health insurance, expand the Medicaid program and support innovative health care delivery methods designed to lower costs. The Affordable Care Act included a number of provisions designed to reduce Medicare expenditures and the cost of health care generally, to reduce fraud and abuse, and to provide access to increased health coverage. For example, the law prohibits insurers from refusing to cover preexisting conditions, requires coverage for certain types of care, and can subject certain large employers to a shared responsibility payment if they do not offer health coverage to their full-time employees. The Affordable Care Act also created government-run, taxpayer-funded health insurance marketplaces (known as “Exchanges”).

The Affordable Care Act impacts the coal mining industry’s costs of providing health care benefits to its eligible active employees, with both short term and long term implications. It affects health care costs by, among other things, setting the maximum age for covered dependents to receive benefits at 26, requiring certain benefits for occupational disease related illnesses, and eliminating lifetime dollar limits on essential benefits per covered individual and restrictions on annual dollar limits on essential benefits per covered individual. The Affordable Care Act also included significant changes to the federal black lung program, including an automatic survivor benefit paid upon death of a miner with an awarded black lung claim and the establishment of a rebuttable presumption with regard to pneumoconiosis among miners with 15 or more years of coal mine employment that are totally disabled by a respiratory condition. The Affordable Care Act also provides lifetime benefits to certain dependents

Coronado Global Resources Inc. Form 10-K December 31, 2021 39


Table of Contents

 

who survive the death of a miner, if the miner had been receiving the benefits before death. For additional information, please see above “––Black Lung (Coal Worker’s Pneumoconiosis).”

The Affordable Care Act has faced ongoing legal challenges, including litigation and legislation seeking to invalidate or modify some or all of the law or the manner in which it has been implemented. For example, the Further Consolidated Appropriations Act of 2020 repealed the “Cadillac tax,” which would have imposed a 40% tax on high-cost employer plans starting in 2022. The constitutionality of the individual mandate, and the entire Affordable Care Act, was challenged in the Fifth Circuit Court of Appeals, and is currently under review by the Supreme Court. The outcome of these cases is uncertain, and any change they make to the Affordable Care Act could have a significant impact on the U.S. health care industry and employers providing health coverage to their workers. Further, the fact that implementation of certain aspects of the Affordable Care Act can be affected by Executive Orders and regulations promulgated by federal governmental agencies that may change when a new President takes office also contributes to the uncertainty as to how the law will affect the U.S. health care industry and employers providing health coverage to their workers.

Safe Drinking Water Act of 1974

The Safe Drinking Water Act of 1974, or SDWA, is the federal law that protects public drinking water supplies throughout the United States. Under the SDWA, the EPA sets federal health-based standards for drinking water quality and implements technical and financial programs to ensure drinking water safety. The SDWA requires regular monitoring and reporting of water quality. The SDWA is applicable to public water systems that have at least 15 service connections or serve at least 25 people per day for 60 days of the year. Further, SDWA standards apply to water systems based on their type and size. There are four categories: i) community water systems, ii) non-community water systems, iii) non-transient, non-community water systems and iv) transient non-community water systems.

The SDWA requires the EPA to establish National Primary Drinking Water Regulations for contaminants that may cause adverse public health effects. These regulations include mandatory requirements and non-enforceable health goals. The EPA sets regulations for drinking water system concentrations of certain organic contaminants, inorganic contaminants, microbiological contaminants, disinfection byproducts, residual disinfectant levels, and radionuclide levels. The EPA also sets filtration requirements for drinking water systems that vary depending on the size of the population served by the system.

The SDWA also regulates the underground injection of fluids into porous formations or rocks through wells and similar conveyance systems, and regulates the construction, operation, permitting and closure of such wells.

The SDWA can impact coal mining operations in the United States to the extent that the operations could impact drinking water supplies.

National Historic Preservation Act of 1966

The National Historic Preservation Act of 1966, or NHPA, governs the preservation of historical properties throughout the United States. The NHPA requires the Department of the Interior’s National Park Service to implement the national policy to preserve for public use historic sites, buildings and objects of national significance for the inspiration and benefit of the people of the United States. Alternatively, a state may carry out this program with oversight from the Department of the Interior if the Department of the Interior approves the state’s historic preservation program. In executing this policy, the National Park Service identifies National Historic Landmarks and places them on a National Register of Historic Places. The NHPA requires that each federal agency prior to authorizing expenditure of federal funds on a federal or federally assisted undertaking, or prior to issuing a federal license for such an undertaking, consider the effect of the undertaking on historic resources and to provide the Advisory Council on Historic Preservation with a reasonable opportunity to comment on the undertaking. Accordingly, the NHPA could create an additional level of scrutiny on a coal mining operation, particularly during the permitting process, to the extent that a mining operation could come within the scope of a historical site. The SMCRA also provides protection for historic resources that would be adversely affected by mining operations by requiring the OSM to comply with the NHPA. If a property is listed on the National Register of Historic Places, SMCRA requires consideration of the property’s historic values in determining issuance of a surface coal mining permit.

Coronado Global Resources Inc. Form 10-K December 31, 2021 40


Table of Contents

 

Endangered Species Act of 1973

The Endangered Species Act of 1973, or ESA, governs the protection of endangered species in the United States and requires the U.S. Department of the Interior’s Fish and Wildlife Service and the National Oceanic and Atmospheric Administration’s National Marine Fisheries Service to formally review any federally authorized, funded or administered action that could negatively affect endangered or threatened species. Under the ESA, the responsibilities of these agencies include listing and delisting species, designating critical habitats, developing recovery plans and conducting five-year reviews of listed species.

The Fish and Wildlife Service studies projects for possible effects to endangered species and then can recommend alternatives or mitigation measures. The OSM and state regulators require mining companies to hire a government-approved contractor to conduct surveys for potential endangered species, and the surveys require approval from state and federal biologists who provide guidance on how to minimize mines’ potential effects on endangered species. Certain endangered species are more typically at issue under the ESA with respect to mining, including the long-eared bat and Guyandotte crayfish, which are found in the Central Appalachian region, including parts of Virginia and West Virginia. Mitigation methods can cause increased costs to coal mining operators. Changes in listings or requirements under these regulations could have a material adverse effect on our costs or our ability to mine some of our properties in accordance with our current mining plans. The ESA allows landowners to receive a special permit to take listed species in some circumstances, provided they have developed a Habitat Conservation Plan approved by the Fish and Wildlife Service.

The U.S. Department of the Interior issued three proposed rules in July 2018 aiming to streamline and update the ESA, and they became effective on September 26, 2019. The rules weaken the protections afforded species listed as threatened, and make it more difficult to add species to the threatened and endangered species lists and easier to delist species. However, on June 4, 2021, the Fish and Wildlife Service and the National Oceanic and Atmospheric Administration's National Marine Fisheries Service announced a plan to strengthen the ESA and revise or rescind regulations passed under the Trump Administration.

Migratory Bird Treaty Act of 1918

The Migratory Bird Treaty Act of 1918, or MBTA, as modified by the Migratory Bird Treaty Reform Act of 2004, makes it unlawful without a waiver to pursue, hunt, take, capture, kill or sell migratory birds, or any part, nest or egg of any migratory bird. A migratory bird species is included on the list of species protected by the MBTA if it meets one or more of the following criteria: i) it occurs in the United States or U.S. territories as the result of natural biological or ecological processes and is currently, or was previously listed as, a species or part of a family protected by certain international treaties, or their amendments, entered into by the United States and Canada, Mexico, Japan or Russia; ii) revised taxonomy results in it being split from a species that was previously on the list, and the new species occurs in the United States or U.S. territories as the result of natural biological or ecological processes; or iii) new evidence exists for its natural occurrence in the United States or U.S. territories resulting from natural distributional changes and the species occurs in a protected family. The Migratory Bird Treaty Reform Act of 2004 requires the Fish and Wildlife Service to publish an informational list of all nonnative, human-introduced bird species to which MBTA does not apply. The most recent list of all nonnative, human-introduced bird species was published on April 16, 2020.

Since coal mining is seen as an industry that can threaten bird populations, coal operators are required to ensure that their operations do not negatively impact migratory birds, or to take mitigation measures. Violations of the MBTA are either misdemeanor or felonies punishable by a fine or imprisonment. Efforts in 2020 and 2021 to narrow the applicability of the MBTA were unsuccessful.

Regulation of explosives

Our surface mining operations are subject to numerous regulations relating to blasting activities, including the Federal Safe Explosives Act, or SEA. SEA applies to all users of explosives. Knowing or willful violations of the SEA may result in fines, imprisonment, or both. In addition, violations of SEA may result in revocation of user permits and seizure or forfeiture of explosive materials. Pursuant to federal regulations, we incur costs to design and implement blast schedules and to conduct pre-blast surveys and blast monitoring. In addition, the storage of explosives is subject to strict regulatory requirements established by four different federal regulatory agencies. For example, pursuant to a rule issued by the Department of Homeland Security in 2007, facilities in possession of chemicals of interest, including ammonium nitrate at certain threshold levels, must complete a screening review

Coronado Global Resources Inc. Form 10-K December 31, 2021 41


Table of Contents

 

in order to help determine whether there is a high level of security risk such that a security vulnerability assessment and site security plan will be required. The Bureau of Alcohol, Tobacco and Firearms and Explosives, or ATF, regulates the sale, possession, storage and transportation of explosives in interstate commerce. In addition to ATF regulation, the U.S. Department of Homeland Security is evaluating a proposed ammonium nitrate security program rule. In 2015, the OSM also proposed a rulemaking addressing nitrogen oxide clouds from blasting; on July 30, 2019, however, the OSM withdrew the proposed rulemaking.

Available Information

We file annual, quarterly and current reports and other documents with the SEC under the Exchange Act. The public can obtain any documents that we file with the SEC at www.sec.gov. We also make available free of charge our Annual Report on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K and any amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange Act as soon as reasonably practicable after filing such materials with, or furnishing such materials to, the SEC, on or through our internet website, https://coronadoglobal.com.au/. We are not including the information contained on, or accessible through, any website as a part of, or incorporating it by reference into, this Annual Report on Form 10-K, unless expressly noted.

Coronado Global Resources Inc. Form 10-K December 31, 2021 42


Table of Contents

 

ITEM 1A. RISK FACTORS.

An investment in our securities is speculative and involves a number of risks. We believe the risks described below are the material risks that we face. However, the risks described below may not be the only risks that we face. Additional unknown risks or risks that we currently consider immaterial, may also impair our business operations. You should carefully consider the specific risk factors discussed below, together with the information contained in this Annual Report on Form 10-K, including Item 7. “Management’s Discussion and Analysis of Financial Condition and Results of Operations” and our consolidated financial statements and the related notes. If any of the events or circumstances described below actually occurs, our business, financial condition or results of operations could suffer, and the trading price of our securities could decline significantly.

Some of these risks include:

•Our business, financial condition and results of operations have been, and will continue to be, adversely affected by the ongoing COVID-19 pandemic;

•Our profitability depends upon the prices we receive for our coal. Prices for coal are volatile and can fluctuate widely based upon a number of factors beyond our control;

•We face increasing competition, which could adversely affect profitability;

•Demand for our Met coal is significantly dependent on the steel industry;

•We may face restricted access to international markets in the future;

•If transportation for our coal becomes unavailable or uneconomic for our customers, our ability to sell coal could suffer;

•Take-or-pay arrangements within the coal industry could unfavorably affect our profitability;

•A decrease in the availability or increase in costs of key supplies, capital equipment, commodities and purchased components, such as diesel fuel, steel, explosives and tires could materially and adversely affect our financial condition and results of operations;

•Defects in title or loss of any leasehold interests in our properties could limit our ability to mine these properties or result in significant unanticipated costs;

•A shortage of skilled labor in the mining industry could pose a risk to achieving improved labor productivity;

•Decreases in demand for coal-fired electricity and changes in thermal coal consumption patterns of the United States and Australian electric power generators could adversely affect our business;

•The existence (or claimed existence) of native title on land within our Australian tenements may impose restrictions on the construction of our expansion activities and our continued operations;

•Risks inherent to mining operations could impact the amount of coal produced, cause delay or suspend coal deliveries, or increase the cost of operating our business;

•Our long-term success depends upon our ability to continue discovering, or acquiring and developing assets containing, coal reserves that are economically recoverable;

•We rely on estimates of our recoverable resources and reserves, which are complex due to geological characteristics of the properties and the number of assumptions made;

•Our profitability could be affected adversely by the failure of suppliers and/or outside contractors to perform;

•Our inability to replace or repair damaged or destroyed equipment or facilities in a timely manner could materially and adversely affect our financial condition and results of operations;

Coronado Global Resources Inc. Form 10-K December 31, 2021 43


Table of Contents

 

•Our ability to operate effectively could be impaired if we lose key personnel or fail to attract qualified personnel;

•We may be unable to obtain, renew or maintain permits necessary for our operations, which would reduce coal production, cash flows and profitability;

•In times of drought and/or shortage of available water, our operations and production, particularly at Curragh, could be negatively impacted if the regulators impose restrictions on our water offtake licenses that are required for water used in the CPPs;

•We may not have adequate insurance coverage for some business risks;

•Cybersecurity attacks, natural disasters, terrorist attacks and other similar crises or disruptions may negatively affect our business, financial condition and results of operations;

•Mining in the CAPP is more complex and involves more regulatory constraints than mining in other areas of the U.S., which could affect our mining operations and cost structures in these areas;

•The loss of, or significant reduction in, purchases by our largest customers could adversely affect our revenues;

•If a substantial number of our customers fail to perform under our contracts with them, our revenues and operating profits could suffer;

•If our ability to collect payments from customers is impaired, our revenues and operating profits could suffer;

•Changes in credit ratings issued by nationally recognized statistical rating organizations could adversely affect our cost of financing and the market price of our securities;

•Our existing and future indebtedness may limit cash flow available to invest in the ongoing needs of our businesses, which could prevent us from fulfilling our obligations under our senior secured notes, senior secured asset-based revolving credit agreement in an initial aggregate principal amount of $100.0 million, or the ABL Facility, and other debt, and we may be forced to take other actions to satisfy our obligations under our debt, which may not be successful;

•We adjust our capital structure from time to time and may need to increase our debt leverage, which would make us more sensitive to the effects of economic downturns;

•Our business may require substantial ongoing capital expenditures, and we may not have access to the capital required to reach full productive capacity at our mines;

•We may not recover our investments in our mining, exploration and other assets, which may require us to recognize impairment charges related to those assets;

•Risks related to our investment in WICET may adversely affect our financial condition and results of operations;

•Risks related to the Supply Deed with Stanwell may adversely affect our financial condition and results of operations;

•We could be adversely affected if we fail to appropriately provide financial assurances for our obligations;

•Mine closures entail substantial costs. If we prematurely close one or more of our mines, our operations and financial performance would likely be affected adversely;

•If the assumptions underlying our provision for reclamation and mine closure obligations prove to be inaccurate, we could be required to expend greater amounts than anticipated;

Coronado Global Resources Inc. Form 10-K December 31, 2021 44


Table of Contents

 

•We are subject to foreign exchange risks involving certain operations in multiple countries;

•Interest rates could change substantially and have an adverse effect on our profitability;

•We may be unsuccessful in integrating the operations of acquisitions with our existing operations and in realizing all or any part of the anticipated benefits of any such acquisitions;

•Coronado Global Resources Inc. is a holding company with no operations of its own and, as such, it depends on its subsidiaries for cash to fund its operations and expenses, including future dividend payments, if any;

•We are subject to extensive health and safety laws and regulations that could have a material adverse effect on our reputation and financial condition and results of operations;

•We could be negatively affected if we fail to maintain satisfactory labor relations;

•Our operations may impact the environment or cause exposure to hazardous substances, which could result in material liabilities to us;

•Concerns about the environmental impacts of coal combustion, including perceived impacts on global climate issues, are resulting in increased regulation of coal combustion and coal mining in many jurisdictions, which could significantly affect demand for our products or our securities;

•Changes in and compliance with government policy, regulation or legislation may adversely affect our financial condition and results of operations;

•Failure to comply with applicable anti-corruption and trade laws, regulations and policies could result in fines and criminal penalties, causing a material adverse effect on our business, operating and financial prospects or performance;

•We are subject to extensive forms of taxation, which imposes significant costs on us, and future regulations and developments could increase those costs or limit our ability to produce coal competitively;

•We may be subject to litigation, the disposition of which could negatively affect our profitability and cash flow in a particular period, or have a material adverse effect on our business, financial condition and results of operations; and

•We have no registered trademarks for our Company name or other marks used by us in the United States or any other countries, and failure to obtain those registrations could adversely affect our business.

Economic, Competitive and Industry Risks

Our business, financial condition and results of operations have been, and will continue to be, adversely affected by the ongoing COVID-19 pandemic.

The ongoing COVID-19 pandemic has had a significant impact on the global economy and the ability of businesses to operate. Our business has been and may continue to be adversely affected by the global outbreak of COVID-19 and the impact could be material. Despite the availability of vaccines in some geographies, COVID-19 continues to spread in the countries in which we operate and our customers and suppliers are located, and uncertainties exist as to the efficacy of vaccines against new variants or mutations of COVID-19. In the attempt to mitigate or contain the spread of the virus, international, federal, state and local public health and governmental authorities have introduced measures and recommendations such as orders restricting movement and public gatherings and the implementation of social distancing protocols, orders for residents to stay at home with a limited range of exceptions, orders restricting travelling overseas or across borders (including interstate), and orders for all non-essential businesses to close, including certain mine sites unless their work is deemed critical, factories and office shutdowns. These restrictions have caused disruptions to mining operations (including Coronado’s operations), manufacturing operations and supply chains around the world.

Coronado Global Resources Inc. Form 10-K December 31, 2021 45


Table of Contents

 

Although there has been an easing of restriction in certain jurisdictions, some of these restrictions have been reinstated in others, or could be reinstated in the near future, in the attempt to contain a resurgence or new COVID-19 outbreaks due to new variants or mutations of the virus.

The continued global spread of the COVID-19 pandemic and the responses thereto are complex and rapidly evolving, and the extent to which the pandemic impacts our business and results of operations, including the duration and magnitude of such impacts, will depend on numerous factors that we may not be able to accurately predict. COVID-19, and the volatile global economic conditions resulted from the pandemic, as well as reactions to future pandemics or resurgences of COVID-19, could also heighten other risks described in this “Item 1A. Risk Factors” section, which could have a material adverse impact in our business and results of operations. Additionally, there may be other adverse impacts to our business and results of operations from the spread of COVID-19 that we have not considered at this time. Therefore, we cannot assure that if COVID-19 continues to spread, it would not have a further adverse impact on our business and results of operations.

Our profitability depends upon the prices we receive for our coal. Prices for coal are volatile and can fluctuate widely based upon a number of factors beyond our control.

We generate revenue from the sale of coal and our financial results are materially impacted by the prices we receive. Prices and quantities under Met coal sales contracts in North America are generally based on expectations of the next year’s coal prices at the time the contract is entered into, renewed, extended or re-opened. Pricing in the global seaborne market is typically set on a rolling quarterly average benchmark price.

Sales by our U.S. Operations to the export market are typically priced with reference to a benchmark index. Sales by our Australian Operations have typically been contracted on an annual basis and are priced with reference to benchmark indices or bilaterally negotiated term prices and spot indices. As a result, a significant portion of our revenue is exposed to movements in coal prices and any weakening in Met or thermal coal prices would have an adverse impact on our financial condition and results of operations.

The expectation of future prices for coal depends upon many factors beyond our control, including the following:

•the current market price of coal;

•overall domestic and global economic conditions, including the supply of and demand for domestic and foreign coal, coke and steel;

•the consumption pattern of industrial consumers, electricity generators and residential users;

•weather conditions in our markets that affect the ability to produce Met coal or affect the demand for thermal coal;

•competition from other coal suppliers;

•technological advances affecting the steel production process and/or energy consumption;

•the costs, availability and capacity of transportation infrastructure; and

•the impact of domestic and foreign governmental policy, laws and regulations, including the imposition of tariffs, environmental and climate change regulations and other regulations affecting the coal mining industry, including regulations and measures introduced in response to the COVID-19 pandemic.

Met coal has been a volatile commodity over the past ten years. Recently, in the third quarter of 2021, seaborne prices reached record levels with both the Australian and U.S. Met coal price indices exceeding $400.0 per Mt, largely as result of continued strong global steel demand and tight supply. The demand and supply in the Met coal industry changes from time to time. There are no assurances that oversupply will not occur, that demand will not decrease or that overcapacity will not occur, which could cause declines in the prices of coal, which could have a material adverse effect on our financial condition and results of operations.

Coronado Global Resources Inc. Form 10-K December 31, 2021 46


Table of Contents

 

In addition, coal prices are highly dependent on the outlook for coal consumption in large Asian economies, such as China, India, South Korea and Japan, as well as any changes in government policy regarding coal or energy in those countries. Seaborne Met coal import demand can also be significantly impacted by the availability of local coal production, particularly in the leading Met coal import countries of China and India, among others, and the competitiveness of seaborne Met coal supply, including from the leading Met coal exporting countries of Australia, the United States, Russia, Canada and Mongolia, among others.

We face increasing competition, which could adversely affect profitability.

Competition in the coal industry is based on many factors, including, among others, world supply, price, production capacity, coal quality and characteristics, transportation capability and costs, blending capability, brand name and diversified operations. We are subject to competition from Met coal producers from Australia, the United States, Russia, Canada, Mongolia and other Met coal producing countries. Should those competitors obtain a competitive advantage in comparison to us (whether by way of an increase in production capacity, higher realized prices, lower operating costs, export/import tariffs, being comparatively less impacted as a result of COVID-19 or otherwise), such competitive advantage may have an adverse impact on our ability to sell, or the prices at which we are able to sell coal products. In addition, some of our competitors may have more production capacity as well as greater financial, marketing, distribution and other resources than we do and may be subject to less stringent environmental and other regulations than we are.

The consolidation of the global Met coal industry in recent years has contributed to increased competition, and our competitive position may be adversely impacted by further consolidation among market participants or by further competitors entering into and exiting bankruptcy proceedings under a lower cost structure. Similarly, potential changes to international trade agreements, trade concessions or other political and economic arrangements may benefit coal producers operating in countries other than the United States and Australia. Other coal producers may also develop or acquire new projects to increase their coal production, which may adversely impact our competitiveness. Some of our global competitors have significantly greater financial resources, such that increases in their coal production may affect domestic and foreign Met coal supply into the seaborne market and associated prices and impact our ability to retain or attract Met coal customers. In addition, our ability to ship our Met coal to non-U.S. and non-Australian customers depends on port and transportation capacity. Increased competition within the Met coal industry for international sales could result in us not being able to obtain throughput capacity at port facilities, as well as transport capacity, and could cause the rates for such services to increase to a point where it is not economically feasible to export our Met coal.

Increased competition, or a failure to compete effectively, in the markets in which we participate may result in a loss of market share and could adversely affect our financial condition and results of operations.

Demand for our Met coal is significantly dependent on the steel industry.

The majority of the coal that we produce is Met coal that is sold, directly or indirectly, to steel producers and is used in blast furnaces for steel production. Met coal, specifically high-quality HCC and low-volatile PCI, which is produced at most of our assets, has specific physical and chemical properties, which are necessary for efficient blast furnace operation. Therefore, demand for our Met coal is correlated to demands of the steel industry. The steel industry’s demand for Met coal is influenced by a number of factors, including: the cyclical nature of that industry’s business; general economic and regulatory conditions and demand for steel; and the availability, cost and preference for substitutes for steel, such as aluminum, composites and plastics, all of which may impact the demand for steel products. Similarly, if new steelmaking technologies or practices are developed that can be substituted for Met coal in the integrated steel mill process, then demand for Met coal would be expected to decrease.

Although conventional blast furnace technology has been the most economic large-scale steel production technology for a number of years, there can be no assurance that over the longer term, competitive technologies not reliant on Met coal would not emerge, which could reduce the demand and price premiums for Met coal. A significant reduction in the demand for steel products would reduce the demand for Met coal, which could have a material adverse effect on our financial condition and results of operations.

Coronado Global Resources Inc. Form 10-K December 31, 2021 47


Table of Contents

 

Additionally, tariffs imposed by the United States on the import of certain steel products may impact foreign steel producers to the extent their production is imported into the United States. In March 2018, the United States established a 25% tariff on imports of steel into the United States, which adversely impacted the economic value of coal previously sourced for sale in China. Future tariffs could further reduce imports of steel and increase U.S. Met coal demand. This additional U.S. Met coal demand could be met by reducing exports of Met coal and redirecting that volume to domestic consumption.

In May 2019, the United States agreed to lift the steel and aluminum tariffs on Mexico and Canada. Currently, Argentina, Australia, Brazil, Canada, Mexico and South Korea are exempt from the additional tariffs on derivative steel products, while Argentina, Australia, Canada and Mexico are exempt from the additional duties on derivative aluminum products.

The tariffs established by the United States have prompted retaliatory tariffs from key trading partners, notably Europe and China. Any further retaliatory tariffs by these or other countries to these tariffs may limit international trade and adversely impact global economic conditions. We cannot ascertain the impact, if any, that similar tariffs may have on demand for our Met coal. See “—We may face restricted access to international markets in the future.”

In addition, we cannot anticipate the impact the COVID-19 pandemic will continue to have on steel production in Japan, Korea, Taiwan, India, Europe, Brazil, China and North America. A significant reduction in steel production would reduce the demand for Met coal, which could have a material adverse effect in our financial condition and results of operations.

We may face restricted access to international markets in the future.

Access to international markets may be subject to ongoing interruptions and trade barriers due to policies and tariffs of individual countries, and the actions of certain interest groups to restrict the import or export of certain commodities. For example, the current imposition of tariffs and import quota restrictions by China on U.S. and Australian coal imports respectively, including the ongoing suspension of imports of Australian coal into China, may in the future have a negative impact on our profitability. The timing of any change to these measures remains uncertain, and there can be no guarantee that other tariffs, import quota restrictions, bans or other trade barriers will not be imposed (whether as a result of geo-political tensions or for other reasons), either by China or in other markets for our products. We may or may not be able to access alternate markets for our coal should additional interruptions and trade barriers occur in the future. An inability for Met coal suppliers to access international markets, including China, would likely result in an oversupply of Met coal and may result in a decrease in prices or the curtailment of production, which could have a material adverse effect on our financial condition and results of operations.

If transportation for our coal becomes unavailable or uneconomic for our customers, our ability to sell coal could suffer.

Our mining operations produce coal, which is transported to customers by a combination of road, rail, barge and ship. The delivery of coal produced by our mining operations is subject to potential disruption and competition from other network users, which may affect our ability to deliver coal to our customers and may have an impact on productivity and profitability. Such disruptions to transportation services may include, among others:

•disruptions due to weather-related problems;

•key equipment or infrastructure failures;

•industrial action;

•rail or port capacity congestion or constraints;

•commercial disputes;

•failure to obtain consents from third parties for access to rail or land, or access being removed or not granted by regulatory authorities;

•changes in applicable regulations;

Coronado Global Resources Inc. Form 10-K December 31, 2021 48


Table of Contents

 

•failure or delay in the construction of new rail or port capacity; and

•terrorist attacks, natural disasters, the impact from the ongoing COVID-19 pandemic or other events.

Any such disruptions, or any deterioration in the reliability of services provided by our transportation service providers, could impair our ability to supply coal to our customers, result in decreased shipments and revenue and adversely affect our results of operations.

Typically, we sell coal at the mine gate and/or loaded into vessels at the port. While ordinarily our coal customers arrange and pay for transportation of coal from the mine or port to the point of use, we have entered into arrangements with third parties to gain access to transportation infrastructure and services where required, including road transport organizations, rail carriers and port owners. Where coal is exported or sold other than at the mine gate, the costs associated with these arrangements represent a significant portion of both the total cost of supplying coal to customers and of our production costs. As a result, the cost of transportation is not only a key factor in our cost base, but also in the purchasing decision of customers. Transportation costs may increase and we may not be able to pass on the full extent of cost increases to our customers. For example, where transportation costs are connected to market demand, costs may increase if usage by us and other market participants increases. Significant increases in transport costs due to factors such as fluctuations in the price of diesel fuel, electricity and demurrage or environmental requirements could make our coal less competitive when compared to coal produced from other regions and countries. As the transportation capacity secured by our port and rail agreements is based on assumed production volumes, we may also have excess transportation capacity (which, in the case of take-or-pay agreements, we may have to pay for even if unused) if our actual production volumes are lower than our estimated production volumes. Conversely, we may not have sufficient transportation capacity if our actual production volumes exceed our estimated production volumes, if we are unable to transport the full capacity due to contractual limitations or if any deterioration in our relationship with brokers and intermediaries results in a reduction in the proportion of coal purchased FOR from our U.S. Operations (and a corresponding increase in the proportion of coal purchased FOB).

Take-or-pay arrangements within the coal industry could unfavorably affect our profitability.

Our Australian Operations generally contract port and rail capacity via long-term take-or-pay contracts for transport, currently with Aurizon Operations Limited and Pacific National Pty Ltd, to and export from the Port of Gladstone via two main port terminals, RGTCT and WICET. At our U.S. Operations, we also have a take-or-pay agreement in connection with the Kinder Morgan Pier IX Terminal in Hampton Roads, Virginia. We may enter into other take-or-pay arrangements in the future.

Where we have entered into take-or-pay contracts, we will generally be required to pay for our contracted port or rail capacity, even if it is not utilized by us or other shippers. Although the majority of our take-or-pay arrangements provide security over minimum port and rail infrastructure availability, unused port or rail capacity can arise as a result of varying unforeseen circumstances, including insufficient production from a given mine, a mismatch between the timing of required port and rail capacity for a mine, or an inability to transfer the used capacity due to contractual limitations, such as required consent of the provider of the port or rail services, or because the coal must emanate from specified source mines or be loaded onto trains at specified load points. Paying for unused transport capacity could materially and adversely affect our cost structures and financial performance. See Item 7. “Management’s Discussion and Analysis of Financial Condition and Results of Operations” for a summary of our expected future obligations under take-or-pay arrangements as of December 31, 2021.

A decrease in the availability or increase in costs of key supplies, capital equipment, commodities and purchased components, such as diesel fuel, steel, explosives and tires could materially and adversely affect our financial condition and results of operations.

Our mining operations require a reliable supply of large quantities of fuel, explosives, tires, steel-related products (including roof control materials), lubricants and electricity. The prices we pay for commodities are strongly impacted by the global market. In situations where we have chosen to concentrate a large portion of purchases with one supplier, it has been to take advantage of cost savings from larger volumes of purchases and to ensure security of supply. If the cost of any of these key supplies or commodities increased significantly, or if a source for these supplies or mining equipment was unavailable to meet our replacement demands, including as a result of the COVID-19 pandemic or otherwise, our profitability could be reduced or we could experience a delay or halt in our production.

Coronado Global Resources Inc. Form 10-K December 31, 2021 49


Table of Contents

 

Our coal production and production costs can be materially and adversely impacted by unexpected shortages or increases in the costs of consumables, spare parts, plant and equipment. For example, operation of the thermal dryer located at the CPP at Buchanan is dependent upon the delivery of natural gas and there is currently only one natural gas supplier in the area, an affiliate of CONSOL Energy. Although we have entered into a gas purchase agreement with CONSOL Energy, this agreement can be terminated by CONSOL Energy on 30 days’ notice and any delay or inability to negotiate a replacement agreement would impact our costs of production as we would need to change our processing method at Buchanan.

Defects in title or loss of any leasehold interests in our properties could limit our ability to mine these properties or result in significant unanticipated costs.

In Queensland, where all of our Australian Operations are carried out, exploring or mining for coal is unlawful without a tenement granted by the Queensland government. The grant and renewal of tenements are subject to a regulatory regime and each tenement is subject to certain conditions. There is no certainty that an application for the grant of a new tenement or renewal of one of the existing Tenements at Curragh will be granted at all or on satisfactory terms or within expected timeframes. Further, the conditions attached to the Tenements may change at the time they are renewed. There is a risk that we may lose title to any of our granted Tenements if we fail to comply with the Tenement conditions and other applicable legislative requirements (including payment of State royalties) or if the land that is subject to the title is required for public purposes. The Tenements have expiration dates ranging from May 31, 2023 to July 31, 2044 and, where renewal is required, there is a risk that the Queensland government may change the terms and conditions of such Tenement upon renewal.

In the United States, title to a leased property and mineral rights is generally secured prior to permitting and developing a property. In some cases, we rely on title information or representations and warranties provided by our lessors, grantors or other third parties. Our right to mine some of our reserves may be adversely affected if defects in title or boundaries exist or if a lease expires. Any challenge to our title or leasehold interests could delay the exploration and development of the property and could ultimately result in the loss of some or all of our interest in the property and, accordingly, require us to reduce our estimated coal reserves. In addition, if we mine on property that we do not own or lease, we could incur civil damages or liability for such mining and be subject to conversion, negligence, trespass, regulatory sanction and penalties. Some leases have minimum production requirements or require us to commence mining operations in a specified term to retain the lease. Failure to meet those requirements could result in losses of prepaid royalties and, in some rare cases, could result in a loss of the lease itself.

In the United States, we predominantly access our mining properties through leases with a range of private landholders. If a default under a lease for properties on which we have mining operations resulted in the termination of the applicable lease, we may have to suspend mining or significantly alter the sequence of such mining operations, which may adversely affect our future coal production and future revenues.

To obtain leases or mining contracts to conduct our U.S. Operations on properties where defects exist or to negotiate extensions or amendments to existing leases, we may in the future have to incur unanticipated costs. In addition, we may not be able to successfully negotiate new leases or mining contracts for properties containing additional reserves or maintain our leasehold interests in properties where we have not commenced mining operations during the term of the lease.

A defect in our title or the loss of any lease or Tenement upon expiration of its term, upon a default or otherwise, could adversely affect our ability to mine the associated reserves or process the coal we mine.

We may be unable to obtain, renew or maintain permits necessary for our operations, which would reduce coal production, cash flows and profitability.

Our performance and operations depend on, among other things, being able to obtain on a timely basis, and maintain, all necessary regulatory approvals, including any approvals arising under applicable mining laws, environmental regulations and other laws, for our current operations, expansion and growth projects. Examples of regulatory approvals that we must obtain and maintain include mine development approvals, environmental permits and, in Australia, tenure and approvals relating to native title and indigenous cultural heritage. In addition, our operations depend on our ability to obtain and maintain consents from private land owners and good relations with local communities.

Coronado Global Resources Inc. Form 10-K December 31, 2021 50


Table of Contents

 

The requirement to obtain and maintain approvals and address potential and actual issues for former, existing and future mining projects is common to all companies in the coal sector. However, there is no assurance or guarantee that we will obtain, secure, or be able to maintain any or all of the required consents, approvals and rights necessary to maintain our current production profile from our existing operations or to develop our growth projects in a manner which will result in profitable mining operations and/or achieve our long-term production targets. The permitting rules, and the interpretations of these rules, are complex, change frequently and are often subject to the interpretation of the regulators that enforce them, all of which may make compliance more difficult or impractical, and may possibly preclude the continuance of ongoing operations or the development of future mining operations. Certain laws, such as the SMCRA, require that certain environmental standards be met before a permit is issued. The public, including non-governmental organizations, anti-mining groups and individuals, have certain statutory rights to comment upon and submit objections to requested permits and environmental impact statements. These comments are prepared in connection with applicable regulatory processes, and the public may otherwise engage in the permitting process, including bringing lawsuits to challenge the issuance of permits, the validity or adequacy of environmental impact statements or performance of mining activities. In states where we operate, applicable laws and regulations also provide that a mining permit or modification can, under certain circumstances, be delayed, refused or revoked if we or any entity that owns or controls or is under common ownership or control with us have unabated permit violations or have been the subject of permit or reclamation bond revocation or suspension. Thus, past or ongoing violations of federal and state mining laws by us or such entity could provide a basis to revoke existing permits and to deny the issuance of additional permits or modification or amendment of existing permits. In recent years, the permitting required for coal mining has been the subject of increasingly stringent regulatory and administrative requirements and extensive activism and litigation by environmental groups. If this trend continues, it could materially and adversely affect our mining operations, development and expansion and cost structures, the transport of coal and our customers’ ability to use coal produced by our mines, which, in turn, could have a material adverse effect on our financial condition and results of operation.

In particular, certain of our activities require a dredge and fill permit from the USACE under Section 404 of the CWA. In recent years, the Section 404 permitting process has been subject to increasingly stringent regulatory and administrative requirements and a series of court challenges, which have resulted in increased costs and delays in the permitting process. In addition, in 2015, the EPA and the USACE issued the CWR, under the CWA that would further expand the circumstances when a Section 404 permit is needed. The CWR is the subject of extensive ongoing litigation and administrative proceedings, as a result of which the CWR has been enjoined in certain states (including West Virginia) and reinstated in others (including Virginia and Pennsylvania), and its current and future impact on our operations are the subject of significant uncertainty. On April 21, 2020, the EPA and the USACE published the NWPR, replacing the CWR. The NWPR revises the definition of waters of the United States and replaces the CWR. The NWPR shrinks the agencies’ jurisdiction, particularly as it relates to tributaries and adjacent waters, such as wetlands, that were previously covered by the definition under the CWR. The NWPR went into effect on June 22, 2020. States and environmental groups have filed challenges to the NWPR in various federal district courts. We cannot at this time predict how this rule will be enforced in the future.

Additionally, we may rely on nationwide permits under the CWA Section 404 program for some of our operations. These nationwide permits are issued every five years, and the 2017 nationwide permit program was recently reissued in January 2017. If we are unable to use the nationwide permits and require an individual permit for certain work, that could delay operations.

If we are unable to obtain and maintain the approvals, consents and rights required for our current and future operations, or if we obtain approvals subject to conditions or limitations, the economic viability of the relevant projects may be adversely affected, which may in turn result in the value of the relevant assets being impaired, which could have a material adverse effect on our financial condition and results of operations.

Coronado Global Resources Inc. Form 10-K December 31, 2021 51


Table of Contents

 

A shortage of skilled labor in the mining industry could pose a risk to achieving improved labor productivity.

Efficient coal mining using modern techniques and equipment requires skilled laborers, preferably with at least a year of experience and proficiency in multiple mining tasks. Any reduced availability or future shortage of skilled labor in the Australian and U.S. mining industries (including, but not limited to, ongoing labor shortage at the Logan operations which has impacted production at our U.S. Operations and as a result of the impact of COVID-19 pandemic) could result in our having insufficient personnel to operate our business, or expand production, particularly in the event there is an increase in the demand for our coal, which could adversely affect our financial condition and results of operations.

Decreases in demand for coal-fired electricity and changes in thermal coal consumption patterns of the United States and Australian electric power generators could adversely affect our business.

In addition to Met coal, our Australian Operations and U.S. Operations produce some thermal coal. Sales of thermal coal represented 27.7% of tons sold by our Australian Operations and 8.4% of our total revenues for the year ended December 31, 2021. The majority of the thermal coal produced by our Australian Operations is sold on a long-term supply arrangement to Stanwell. Sales of thermal coal by our Australian Operations to domestic and export buyers are exposed to fluctuations in the global demand for thermal coal or electricity. However, coal sold to Stanwell is not directly exposed to fluctuations in the global demand for electricity or thermal coal. Under the Stanwell supply contract, Stanwell can set volumes, and pricing is set at significantly below-market rates. Our cost of supplying coal to Stanwell has been and may continue to be greater than the price paid by Stanwell. See “—Risks related to the Supply Deed with Stanwell may adversely affect our financial condition and results of operations.”

For the year ended December 31, 2021, sales of thermal coal represented 2.8% of tons sold by our U.S. Operations and 0.8% of our total revenues for the year ended December 31, 2021. As such, any changes in coal consumption by electric power generators in the United States could impact our business over the long term.

While power generation from thermal coal remains a cost-effective form of energy, the increasing focus on renewable energy generation, competition from alternative fuel sources, such as natural gas, environmental regulations and the consequential decline in electricity generation from fossil fuels, is expected to result in the further decline of coal-fired electricity generation due to retirement of coal-fired capacity in favor of alternative energy. The low price of natural gas in years preceding the COVID-19 pandemic has resulted in some U.S. electric power generators increasing natural gas consumption while decreasing coal consumption.

Further reductions in the demand for coal-fired electricity generation and the growth of alternative energy options, such as renewables, and alternate power generation technologies, as well as any reduction in demand for electricity generally as a result of the impact of the ongoing COVID-19 pandemic could materially reduce the demand for thermal coal, which may have a material adverse effect on our financial condition and results of operations.

The existence (or claimed existence) of native title on land within our Australian tenements may impose restrictions on the construction of our expansion activities and our continued operations.

In Australia, mineral exploration and mining tenure (and many other forms of tenure or interests in land) may cover land that is subject to a claim for native title or land where native title has already been determined to exist. Native title is the communal, group or individual rights and interests of Aboriginal or Torres Strait Islander people in relation to their traditional land or waters. The existence of native title in Australia is recognized and protected in accordance with the Native Title Act 1993 (Cth), or the Native Title Act, and legislation in each State and Territory. The common law of Australia recognizes a form of native title that, in circumstances where it has not been extinguished, reflects the entitlement of the appropriate traditional owners to their lands, in accordance with their traditional law and custom.

Coronado Global Resources Inc. Form 10-K December 31, 2021 52


Table of Contents

 

If native title is either determined to exist or there are registered, but undetermined, native title claims over any part of the tenements and native title has not otherwise been extinguished with respect to that part, we may be required to negotiate with, and pay compensation to, the native title holders for impairment, loss or diminution or other effect of the proposed activities on their native title rights and interests. Compensation obligations may also arise pursuant to agreements with native title claimants or native title holders in relation to any tenements we acquire. The existence of native title or a registered native title claim may preclude or delay the granting of exploration and mining tenements pending resolution of the statutory procedures imposed by the Native Title Act and considerable expenses may be incurred in negotiating and resolving native title issues.

The risk of unforeseen native title claims also could affect existing operations as well as development projects. Although native title will not prevent the exercise of any validly granted rights and interests under our tenements, the Native Title Act and applicable State and Commonwealth legislation, together with the recognition of native title at common law, may impact the continued operations under our tenements, development projects and the construction of our expansion activities and/or give rise to liability for compensation.

The Aboriginal Cultural Heritage Act 2003 (Qld) and the Torres Strait Islander Cultural Heritage Act 2003 (Qld) provide a framework for the protection of Aboriginal and Torres Strait Islander cultural heritage. The main mechanism through which each act operates is a list of places and artifacts of heritage significance. The acts also create offenses such as breach of the cultural heritage duty of care. This duty of care requires a person carrying out an activity to take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.

In addition, it may also be necessary for us to enter into separate arrangements with the traditional owners of the sites. This could be costly for us and potentially cause delays in our continued operational and expansion activities.

Although the failure to resolve any issues associated with sites of indigenous heritage significance could adversely impact our expansion activities and our continuing operations, there are no such current or anticipated issues.

Operational and Technology Risks

Risks inherent to mining operations could impact the amount of coal produced, cause delay or suspend coal deliveries, or increase the cost of operating our business.

Our mining operations, including exploration, development, preparation, product handling and accessing transport infrastructure, may be affected by various operational difficulties that could impact the amount of coal produced at our coal mines, cause delay or suspend coal deliveries, or increase the cost of mining for a varying length of time. Our financial performance is dependent on our ability to sustain or increase coal production and maintain or increase operating margins. Our coal production and production costs are, in many respects, subject to conditions and events beyond our control, which could disrupt our operations and have a significant impact on our financial results. Adverse operating conditions and events that we may have experienced in the past or may experience in the future include:

•a failure to achieve the Met qualities anticipated from exploration activities;

•variations in mining and geological conditions from those anticipated, such as variations in coal seam thickness and quality, and geotechnical conclusions;

•operational and technical difficulties encountered in mining, including equipment failure, delays in moving longwall equipment, drag-lines and other equipment and maintenance or technical issues;

•adverse weather conditions or natural or man-made disasters, including hurricanes, cyclones, tornadoes, floods, droughts, bush fires, seismic activities, ground failures, rock bursts, structural cave-ins or slides and other catastrophic events (such as the ongoing COVID-19 pandemic that has caused significant disruption across nearly all industries and markets, including global supply chain shortages, the impact of which, continues to be uncertain);

•insufficient or unreliable infrastructure, such as power, water and transport;

Coronado Global Resources Inc. Form 10-K December 31, 2021 53


Table of Contents

 

•industrial and environmental accidents, such as releases of mine-affected water and diesel spills (both of which have affected our Australian Operations in the past);

•industrial disputes and labor shortages;

•mine safety accidents, including fatalities, fires and explosions from methane and other sources;

•competition and conflicts with other natural resource extraction and production activities within overlapping operating areas, such as natural gas extraction or oil and gas development;

•unexpected shortages, or increases in the costs, of consumables, spare parts, plant and equipment;

•cyber-attacks that disrupt our operations or result in the dissemination of proprietary or confidential information about us to our customers or other third parties; and

•security breaches or terrorist acts.

If any of the foregoing conditions or events occurs and is not mitigated or excusable as a force majeure event under our coal sales contracts, any resulting failure on our part to deliver coal to the purchaser under such contracts could result in economic penalties, demurrage costs, suspension or cancellation of shipments or ultimately termination of such contracts, which could have a material adverse effect on our financial condition and results of operations.

Our U.S. Operations are concentrated in a small number of mines in the CAPP and our Australian Operations include one mine in the Bowen Basin of Australia. As a result, the effects of any of these conditions or events may be exacerbated and may have a disproportionate impact on our results of operations and assets. Any such operational conditions or events could also result in disruption to key infrastructure (including infrastructure located at or serving our mining activities, as well as the infrastructure that supports freight and logistics). These conditions and events could also result in the partial or complete closure of particular railways, ports or significant inland waterways or sea passages, potentially resulting in higher costs, congestion, delays or cancellations on some transport routes. Any of these conditions or events could adversely impact our business and results of operations.

Our long-term success depends upon our ability to continue discovering, or acquiring and developing assets containing, coal reserves that are economically recoverable.

Our recoverable reserves decline as we produce coal. Our long-term outlook depends on our ability to maintain a commercially viable portfolio of coal reserves that are economically recoverable. Failure to acquire or discover new coal reserves or develop new assets could negatively affect our financial condition and results of operations. Exploration activity may occur adjacent to established assets and in new regions. These activities may increase land tenure, infrastructure and related political risks. Failure to discover or acquire new coal reserves, replace coal reserves or develop new assets or operations in sufficient quantities to maintain or grow the current level of reserves could negatively affect our financial condition and results of operations.

Potential changes to our portfolio of assets through acquisitions and divestments may have an adverse effect on future results of operations and financial condition. From time to time, we may add assets to, or divest assets from, our portfolio. There are a number of risks associated with historical and future acquisitions or divestments, including, among others:

•adverse market reaction to such acquisitions and divestments or the timing or terms on which acquisitions and divestments are made;

•imposition of adverse regulatory conditions and obligations;

•political and country risk;

•commercial objectives not being achieved as expected;

•unforeseen liabilities arising from changes to the portfolio;

Coronado Global Resources Inc. Form 10-K December 31, 2021 54


Table of Contents

 

•sales revenues and operational performance not meeting expectations;

•anticipated synergies or cost savings being delayed or not being achieved; and

•inability to retain key staff and transaction-related costs being more than anticipated.

These factors could materially and adversely affect our financial condition and results of operations.

We rely on estimates of our recoverable resources and reserves, which are complex due to geological characteristics of the properties and the number of assumptions made.

We rely on estimates of our recoverable resources and reserves. In this Annual Report on Form 10-K, we report our estimated resources and reserves in accordance with subpart 1300 of Regulation S-K under the Exchange Act. See Item 2. “Properties.” These requirements differ significantly from the previously applicable disclosure requirements of SEC industry Guide 7. Among other differences, subpart 1300 of Regulation S-K requires us to disclose our mineral resources, in addition to our mineral reserves. In addition, as an ASX-listed company, our ASX disclosures follow the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves 2012, or the JORC Code. Accordingly, our estimates of resources and reserves in this Annual Report on Form 10-K and in other reports that we are required to file with the SEC may be different than our estimates of resources and reserves as reported in our ASX disclosures.

Coal is economically recoverable when the price at which it can be sold exceeds the costs and expenses of mining and selling the coal. The costs and expenses of mining and selling the coal are determined on a mine-by-mine basis, and as a result, the price at which our coal is economically recoverable varies based on the mine. We base our resource and reserve information on geologic data, coal ownership information and current and proposed mine plans, and mining cost assumptions may be affected by changes in mine planning or scheduling over time. There are numerous uncertainties inherent in estimating quantities and qualities of coal and costs to mine recoverable reserves, including many factors beyond our control. There are inherent uncertainties and risks associated with such estimates, including:

•geologic and mining conditions, which may not be fully identified by available exploration data and may differ from our experience and assumptions in areas we currently mine;

•current and future market prices for coal, contractual arrangements, operating costs and capital expenditures;

•severance and excise taxes, unexpected governmental taxes, royalties, stamp duty and development and reclamation costs;

•future mining technology improvements;

•the effects of regulation by governmental agencies;

•the ability to obtain, maintain and renew all required permits;

•employee health and safety; and

•historical production from the area compared with production from other producing areas.

Except for that portion of mineral resources classified as mineral reserves, mineral resources do not have demonstrated economic value. Even if a mineral resource exists, there can be no assurance that any part of such mineral resource will ever be converted to mineral reserves.

In addition, estimates of coal resources and reserves are revised based on actual production experience, and/or new exploration information and therefore the estimates of coal resources and reserves are subject to change. Should we encounter geological conditions or qualities different from those predicted by past drilling, sampling and similar examinations, estimates of coal resources and reserves may have to be adjusted and mining plans, coal processing and infrastructure may have to be altered in a way that might adversely affect our operations. As a result, our estimates may not accurately reflect our actual future coal resources and reserves.

Coronado Global Resources Inc. Form 10-K December 31, 2021 55


Table of Contents

 

As a result, the quantity and quality of the coal that we recover may be less than the resource and reserve estimates included in this Annual Report on Form 10-K. If our actual coal resources and reserves are less than current estimates, or the rate at which they are recovered is less than estimated or results in higher than estimated cost, our financial condition and results of operations may be materially adversely affected.

Our profitability could be affected adversely by the failure of suppliers and/or outside contractors to perform.

We use contractors and other third parties for exploration, mining and other services generally, and are reliant on several third parties for the success of our current operations and the development of our growth projects. While this is normal for the mining industry, problems caused by third parties may arise, which may have an impact on our performance and operations. In particular, the majority of workers at our Australian Operations are employed by contractors, including Thiess, Golding Contractors Pty Ltd, and Wolff Mining Pty Ltd.

Operations at our mines may be interrupted for an extended period in the event that we lose any of our key contractors (because their contract is terminated or expires) and are required to replace them. There can be no assurance that skilled third parties or contractors will continue to be available at reasonable rates. As we do not have the same control over contractors as we do over employees, we are also exposed to risks related to the quality or continuation of the services of, and the equipment and supplies used by, our contractors, as well as risks related to the compliance of our contractors with environmental and health and safety legislation and internal policies, standards and processes. Any failure by our key contractors to comply with their obligations under our operating agreements with them (whether as a result of financial, safety or operational difficulties or otherwise), any termination or breach of our operating agreements by our contractors, any protracted dispute with a contractor, any inability to perform due to the impact of the ongoing COVID-19 pandemic, any material labor dispute between our contractors and their employees or any major labor action by those employees against our contractors, could have a material adverse effect on our financial condition and results of operations.

Further, in periods of high commodity prices, demand for contractors may exceed supply resulting in increased costs or lack of availability of key contractors. Disruptions of operations or increased costs also can occur as a result of disputes with contractors or a shortage of contractors with particular capabilities. To the extent that any of the foregoing risks were to materialize, our operating results and cash flows could be adversely affected.

Our inability to replace or repair damaged or destroyed equipment or facilities in a timely manner could materially and adversely affect our financial condition and results of operations.

We depend on several major pieces of mining equipment and facilities to produce and transport coal, including, but not limited to, longwall mining systems, continuous miners, draglines, dozers, excavators, shovels, haul trucks, conveyors, CPPs and rail loading and blending facilities. Obtaining and repairing these major pieces of equipment often involves long lead times. If any of these pieces of equipment and facilities suffers major damage or is destroyed by fire, abnormal wear and tear, flooding, incorrect operation or otherwise, we may be unable to replace or repair them in a timely manner or at a reasonable cost, which would impact our ability to produce and transport coal and could materially and adversely affect our financial condition and results of operations. Our ability to replace or repair damaged or destroyed equipment or facilities may also be dependent on suppliers or manufactures remaining operational and having the relevant equipment, work force or services available for us. Suppliers and manufactures may be unable to provide such equipment, work force or service for a range of reasons, including but not limited to their business suffering adverse effects as a result of the ongoing COVID-19 pandemic.

Additionally, regulatory agencies sometimes make changes with regard to requirements for pieces of equipment. Such changes can impose costs on us and can cause delays if manufacturers and suppliers are unable to make the required changes in compliance with mandated deadlines.

Our ability to operate effectively could be impaired if we lose key personnel or fail to attract qualified personnel.

The loss of key personnel and the failure to recruit sufficiently qualified staff could affect our future performance. We have entered into employment contracts with a number of key personnel in Australia and the United States, including our Managing Director and Chief Executive Officer, Garold Spindler, our Chief Operating Officer U.S., Jeffrey Bitzer, and our Chief Operating Officer, Australia, Douglas Thompson.

Coronado Global Resources Inc. Form 10-K December 31, 2021 56


Table of Contents

 

Mr. Spindler’s, Mr. Bitzer’s and Mr. Thompson’s expertise and experience in the mining industry are important to the continued development and operation of our mining interests. However, there is no assurance that such personnel will remain with us for the term of their employment contracts or beyond. In the United States, we have not entered into employment contracts with any of our key personnel (other than Mr. Spindler, Mr. Bitzer and their direct reports), meaning that we do not have the benefit of notice provisions or non-compete restraints with these employees. There may be a limited number of persons with the requisite experience and skills to serve in our senior management positions. We may not be able to locate or employ qualified executives on acceptable terms. In addition, as our business develops and expands, we believe that our future success will depend greatly on our continued ability to attract and retain highly skilled personnel with coal industry experience in Australia and the United States. We may not be able to continue to employ key personnel or attract and retain qualified personnel in the future. The loss of such key personnel or the failure to recruit sufficiently qualified employees may affect our business and future performance.

In times of drought and/or shortage of available water, our operations and production, particularly at Curragh, could be negatively impacted if the regulators impose restrictions on our water offtake licenses that are required for water used in the CPPs.

In Queensland, all entitlements to the use, control and flow of water are vested in the state and regulated by the Water Act 2000 (Qld). Allocations under the Water Act 2000 (Qld) can be managed by a water supply scheme operator, such as SunWater Ltd. We have purchased the required water allocations for Curragh and entered into a suite of related channel and pipeline infrastructure agreements and river supply agreements with SunWater Ltd. to regulate the supply of water pursuant to these allocations.

The amount of water that is available to be taken under a water entitlement will vary from year to year and is determined by water sharing rules of the relevant catchment area. These rules will, for example, state a procedure for water supply scheme holders to calculate the water available to an allocation holder, based on available and predicted supply. In situations of severely constrained supply (such as during a drought), supply contracts with the scheme operator generally provide for a reduced apportionment, with certain uses (e.g., domestic use) being given higher priority. It is possible that during times of drought our water offtake entitlements in Australia could be reduced. If our water offtake entitlement was reduced, the operations would have to recycle more of the water collected in on-site dams and former mining pits, from rainfall and dewatering activities, for use in the Curragh CPPs. This may impact our ability to maintain current production levels without incurring additional costs, which could adversely impact our operations and production.

We may not have adequate insurance coverage for some business risks.

We have insurance coverage for certain operating risks that provide limited coverage for some potential liabilities associated with our business. As a result of market conditions, premiums and deductibles for certain insurance policies can increase substantially, and in some instances, certain insurance may become unavailable or available only for reduced amounts of coverage. As a result, we may not be able to renew our existing insurance policies or procure other desirable insurance on commercially reasonable terms, if at all. In addition, we may become subject to liability (including in relation to pollution, occupational illnesses or other hazards), or suffer loss resulting from business interruption, for which we are not insured (or are not sufficiently insured) or cannot insure, including liabilities in respect of past activities.

Should we suffer a major uninsured loss, future financial performance could be materially adversely affected. In addition, insurance may not continue to be available at economically acceptable premiums or coverage may be reduced. As a result, the insurance coverage may not cover the full scope and extent of claims against us or losses we may incur. The occurrence of a significant adverse event not fully or partially covered by insurance could have a material adverse effect on our financial condition and results of operations.

Coronado Global Resources Inc. Form 10-K December 31, 2021 57


Table of Contents

 

Cybersecurity attacks, natural disasters, terrorist attacks and other similar crises or disruptions may negatively affect our business, financial condition and results of operations.

Our business may be impacted by disruptions such as cybersecurity attacks or failures, threats to physical security, and extreme weather conditions or other natural disasters. Strategic targets, such as energy-related assets, may be at greater risk of future terrorist or cybersecurity attacks than other targets in the United States or Australia. These disruptions or any significant increases in energy prices that follow could result in government-imposed price controls. Our insurance may not protect us against such occurrences. It is possible that any of these occurrences, or a combination of them, could have a material adverse effect on our business, financial condition and results of operations.

In addition, a disruption in, or failure of, our information technology systems could adversely affect our business operations and financial performance. We rely on the accuracy, capacity and security of our information technology, or IT, systems for the operations of many of our business processes and to comply with regulatory, legal and tax requirements. While we maintain some of our critical IT systems, we are also dependent on third parties to provide important IT services relating to, among other things, human resources, electronic communications and certain finance functions. Despite the security measures that we have implemented, including those related to cybersecurity, our systems could be breached or damaged by computer viruses, natural or man-made incidents or disasters or unauthorized physical or electronic access. Though we have controls in place, we cannot provide assurance that a cyber-attack will not occur.

Furthermore, we may have little or no oversight with respect to security measures employed by third-party service providers, which may ultimately prove to be ineffective at countering threats. Failures of our IT systems, whether caused maliciously or inadvertently, may result in the disruption of our business processes, the unauthorized release of sensitive, confidential or otherwise protected information or the corruption of data, which could adversely affect our business operations and financial performance. We may be required to incur significant costs to protect against and remediate the damage caused by such disruptions or system failures in the future.

Mining in the CAPP is more complex and involves more regulatory constraints than mining in other areas of the U.S., which could affect our mining operations and cost structures in these areas.

Mining in the CAPP is more complex and involves more regulatory constraints than mining in other areas of the United States, which could affect our mining operations and cost structures in these areas. The geological characteristics of coal reserves in the CAPP, such as depth of overburden and coal seam thickness, make them complex and costly to mine. As mines become depleted, replacement reserves may not be available or, if available, may not be able to be mined at costs comparable to those of the depleting mines. In addition, compared to mines in the other areas of the United States, permitting, licensing and other environmental and regulatory requirements are more costly and time consuming to satisfy. These factors could materially adversely affect the mining operations and cost structures of, and our customers’ ability to use coal produced by, our mining properties in the CAPP.

Financial and Strategic Risks

The loss of, or significant reduction in, purchases by our largest customers could adversely affect our revenues.

For the year ended December 31, 2021, our top ten customers comprised 68.7% of our total revenue and our top five customers comprised 46.3% of our total revenue. For the year ended December 31, 2021, sales to Xcoal and Tata Steel represented approximately 11.2% and 16.7%, respectively, of our total revenue. The majority of our sales are made on a spot basis or under contracts with terms of typically one year. The failure to obtain additional customers or the loss of all or a portion of the revenues attributable to any customer as a result of competition, creditworthiness, inability to negotiate extensions, replacement of contracts or the impact of the ongoing COVID-19 pandemic or otherwise, may adversely affect our business, financial condition and results of operations.

Coronado Global Resources Inc. Form 10-K December 31, 2021 58


Table of Contents

 

If a substantial number of our customers fail to perform under our contracts with them, our revenues and operating profits could suffer.

A significant portion of the sales of our Met coal is to customers with whom we have had long-term relationships. The success of our business depends on our ability to retain our current customers, renew our existing customer contracts and solicit new customers. Our ability to do so generally depends on a variety of factors, including having our mines operational, having the type and quantity of coal available, the quality and price of our products, our ability to market these products effectively, our ability to deliver on a timely basis and the level of competition that we face.

In addition, our sales contracts generally contain provisions that allow customers to suspend or terminate if we commit a material breach of the terms of the contract, a change in law restricts or prohibits a party from carrying out its material obligations under the contract or a material adverse change occurs in our financial standing or creditworthiness. If customers suspend or terminate existing contracts, or otherwise refuse to accept shipments of our Met coal for which they have an existing contractual obligation, our revenues will decrease, and we may have to reduce production at our mines until our customers’ contractual obligations are honored.

If our customers do not honor contract commitments, or if they terminate agreements or exercise force majeure provisions allowing for the temporary suspension of performance during specified events beyond the parties’ control, including the ongoing COVID-19 pandemic and we are unable to replace the contract, our financial condition and results of operations could be materially and adversely affected.

If our ability to collect payments from customers is impaired, our revenues and operating profits could suffer.

Our ability to receive payment for coal sold and delivered will depend on the continued contractual performance and creditworthiness of our customers and counterparties. For certain customers, we require the provision of a letter of credit as security for payment. A sustained payment default by one or more of our largest customers could have a material adverse effect on our financial condition and results of operations. The inability of key customers to procure letters of credit (due to general economic conditions or the specific circumstances of the customer) may restrict our ability to contract with such customers or result in fewer sales contracts being executed, which could materially adversely affect our financial condition and results of operations. For certain of our large customers in Australia who have not provided letters of credit or other form of security, we maintain an insurance policy to cover for any failure in payment.

If non-payment occurs, we may decide to sell the customer’s Met coal on the spot market, which may be at prices lower than the contracted price, or we may be unable to sell the coal at all. If our customers’ or counterparties’ creditworthiness deteriorates, our business could be adversely affected.

Changes in credit ratings issued by nationally recognized statistical rating organizations could adversely affect our cost of financing and the market price of our securities.

Credit rating agencies could downgrade our ratings due to factors specific to our business, a prolonged cyclical downturn in the mining industry or macroeconomic trends (such as global or regional recessions) and trends in credit and capital markets more generally. Any decline in our credit ratings would likely result in an increase to our cost of financing, limit our access to the capital markets, significantly harm our financial condition and results of operations, hinder our ability to refinance existing indebtedness on acceptable terms and have an adverse effect on the market price of our securities.

Our existing and future indebtedness may limit cash flow available to invest in the ongoing needs of our businesses, which could prevent us from fulfilling our obligations under our senior secured notes, senior secured asset-based revolving credit agreement in an initial aggregate principal amount of $100.0 million, or the ABL Facility, and other debt, and we may be forced to take other actions to satisfy our obligations under our debt, which may not be successful.

As of December 31, 2021, we had $315.0 million aggregate principal amount of secured long-term debt outstanding. As of December 31, 2021, no amounts were outstanding, and no outstanding letters of credit issued under the ABL Facility. As of December 31, 2021, the available borrowing capacity under our ABL Facility was $100.0 million.

Coronado Global Resources Inc. Form 10-K December 31, 2021 59


Table of Contents

 

We dedicate a portion of our cash flow from operations to the payment of debt service, reducing the availability of our cash flow to fund capital expenditures, acquisitions or strategic development initiatives and other general corporate purposes. Our ability to make scheduled payments on or to refinance our debt obligations depends on our ability to generate cash in the future and our financial condition and operating performance, which are subject to prevailing economic and competitive conditions and to certain financial, business and other factors beyond our control, including the impact of the COVID-19 pandemic. There can be no assurance that we will maintain a level of cash flows from operating activities sufficient to permit us to pay the principal, premium, if any, and interest on our debt. In addition, any failure to comply with covenants in the instruments governing our debt could result in an event of default that, if not cured or waived, would have a material adverse effect on us.

Our level of indebtedness could have further consequences, including, but not limited to, increasing our vulnerability to adverse economic or industry conditions, placing us at a competitive disadvantage compared to other businesses in the industries in which we operate that are not as leveraged and that may be better positioned to withstand economic downturns, limiting our flexibility to plan for, or react to, changes in our businesses and the industries in which we operate, and requiring us to refinance all or a portion of our existing debt. We may not be able to refinance on commercially reasonable terms or at all, and any refinancing of our debt could be at higher interest rates and may require us to comply with more onerous covenants, making it more difficult to obtain surety bonds, letters of credit or other financial assurances that may be demanded by our vendors or regulatory agencies, particularly during periods in which credit markets are weak.

A portion of our borrowing capacity and outstanding indebtedness bears interest at a variable rate based on the London Interbank Offered Rate, or LIBOR. U.S-dollar LIBOR must be replaced before June 30, 2023. The Alternative Reference Rates Committee has proposed the Secured Overnight Financing Rate, or SOFR, as its recommended alternative to LIBOR. It is uncertain at this time, however, what the potential impact of the transition from LIBOR as an interest rate benchmark to other potential alternative reference rates, including SOFR, may be on our financial condition and results of operations. See “—Interest rates could change substantially and have an adverse effect on our profitability.”

If we are unable to service our debt obligations, we could face substantial liquidity problems and we may be forced to reduce or delay investments and capital expenditures, or to sell assets, seek additional capital, including additional secured or unsecured debt, or restructure or refinance our debt, and we may be unable to continue as a going concern. We may be unable to consummate any proposed asset sales or recover the carrying value of these assets, and any proceeds may not be adequate to meet any debt service obligations then due. Any of these examples potentially could have a material adverse impact on our results of operations, profitability, stockholders’ equity and capital structure.

We adjust our capital structure from time to time and may need to increase our debt leverage, which would make us more sensitive to the effects of economic downturns.

It is possible that we may need to raise additional debt or equity funds in the future. Our ABL Facility and operating cash flows may not be adequate to fund our ongoing capital requirements, for any future acquisitions or projects or to refinance our debt. There is no guarantee that we will be able to refinance our existing debt, or if we do, there is no guarantee that such new funding will be on terms acceptable to us.

Global credit markets have been severely constrained in the past, such as during a global financial crisis and the European sovereign debt crisis, and during the ongoing COVID-19 pandemic, and the ability to obtain new funding or refinance in the future may be significantly reduced. If we are unable to obtain sufficient funding, either due to banking and capital market conditions, generally, or due to factors specific to our business, we may not have sufficient cash to meet our ongoing capital requirements, which in turn could materially and adversely affect our financial condition. Failure to obtain sufficient financing could cause delays or abandonment of business development plans and have a material adverse effect on our business, operations and financial condition.

Recently, certain financial institutions, investment managers and insurance companies globally have responded to pressure to take actions to limit or divest investments in, financing made available to, and insurance coverage provided for, the development of new coal-fired power plants and coal miners that derive revenues from thermal coal sales. For example, in 2017, some financial institutions publicly announced that they would stop funding new thermal coal projects or would otherwise reduce their overall lending to coal producers. These or similar policies may adversely impact the coal industry generally, our ability to access capital and financial markets in the future, our costs of capital and the future global demand for coal.

Coronado Global Resources Inc. Form 10-K December 31, 2021 60


Table of Contents

 

Our business may require substantial ongoing capital expenditures, and we may not have access to the capital required to reach full productive capacity at our mines.

Maintaining and expanding mines and related infrastructure is capital intensive. Specifically, the exploration, permitting and development of Met coal reserves, mining costs, the maintenance of machinery, facilities and equipment and compliance with applicable laws and regulations require ongoing capital expenditures. Any decision to increase production at our existing mines or to develop the high-quality Met coal recoverable reserves at our development properties in the future could also affect our capital needs or cause future capital expenditures to be higher than in the past and/or higher than our estimates. We cannot assure that we will be able to maintain our production levels or generate sufficient cash flow, or that we will have access to sufficient financing to continue our production, exploration, permitting and development activities at or above our present levels and on our present levels or levels achieved prior to the COVID-19 pandemic and on our current or projected timelines, and we may be required to defer all or a portion of our capital expenditures. Our results of operations, business and financial condition may be materially adversely affected if we cannot make such capital expenditures.

To fund our capital expenditures, we will be required to use cash from our operations, incur debt or raise new equity. Our ability to obtain bank financing or our ability to access the capital markets for future equity or debt offerings, on the other hand, may be limited by our financial condition at the time of any such financing or offering and the covenants in our existing debt agreements, as well as by general economic conditions, contingencies and uncertainties that are beyond our control. If cash flow generated by our operations or available borrowings under our bank financing arrangements are insufficient to meet our capital requirements and we are unable to access the capital markets on acceptable terms or at all, we could be forced to curtail the expansion of our existing mines and the development of our properties which, in turn, could lead to a decline in our production and could materially and adversely affect our business, financial condition and results of operations.

We may not recover our investments in our mining, exploration and other assets, which may require us to recognize impairment charges related to those assets.

Our balance sheet includes a number of assets that are subject to impairment risk, particularly long-lived assets, including property, plant and equipment, mining tenements, exploration and evaluation assets and intangible assets (including goodwill). The values of these assets are generally derived from the fundamental valuation of the underlying mining operations and, as such, are subject to many of the same risks to which our operations are exposed, including decreases in coal prices, foreign currency exchange risks, operational and geological risks, changes in coal production and changes in estimates of proven and probable coal reserves. Adverse changes in these and other risk factors could lead to a reduction in the valuation of certain of our assets and result in an impairment charge being recognized.

In 2020, as a result of the ongoing COVID-19 pandemic and resulting market conditions, we recognized a non-cash impairment charge of $78.1 million in relation the Greenbrier mining asset in our financial results.

Risks related to our investment in WICET may adversely affect our financial condition and results of operations.

We have a minority interest in WICET Holdings Pty Ltd, whose wholly owned subsidiary, Wiggins Island Coal Export Terminal Pty Ltd , or WICET Pty Ltd, owns WICET. Other coal producers who export coal through WICET also hold shares in WICET Holdings Pty Ltd. In addition, we and the other coal producers (or shippers) have evergreen, ten year take-or-pay agreements with WICET Pty Ltd and pay a terminal handling charge to export coal through WICET, which is calculated by reference to WICET’s annual operating costs, as well as finance costs associated with WICET Pty Ltd’s external debt facilities.

Coronado Global Resources Inc. Form 10-K December 31, 2021 61


Table of Contents

 

Under our take-or-pay agreement with WICET Pty Ltd, or the WICET Take-or-Pay Agreement, Curragh’s export capacity is 1.5 MMtpa and we are obligated to pay the terminal handling charge for this capacity, whether utilized or not. The terminal handling charge calculation is based on total operating and finance costs of WICET Pty Ltd being charged to contracted shippers in proportion to each shipper’s contracted capacity. Under the terms of the WICET Take-or-Pay Agreement the terminal handling charge payable by us can be adjusted (increased or decreased) by WICET Pty Ltd if WICET Pty Ltd’s operating and finance costs change, or if a contracted shipper defaults on its take-or-pay agreement obligations and has its contracted capacity reduced to nil. Under the terms of the WICET Take-or-Pay Agreement there is a limit of how much WICET Pty Ltd can charge us for recovery of its finance costs, referred to as a finance cap. Since WICET began operating in April 2015, four WICET Holdings Pty Ltd shipper-shareholders have defaulted on their obligations under their respective take-or-pay agreements and subsequently had those agreements terminated. The result of these terminations is a decrease in the aggregate contracted tonnage at WICET from 27 MMtpa to 15.5 MMtpa.

In addition, in July 2019, we were assigned export capacity of 1.6 Mtpa at WICET from another shipper on a take-or-pay basis for a term to June 30, 2022, at prevailing market rates. This assignment increases our total terminal handling charge costs for access to WICET. The terms under this take-or-pay arrangement differ from those in our original WICET Take-or-Pay Agreement. Under the terms and conditions of this take-or-pay arrangement, the other shipper has transferred their assigned capacity at the port and in exchange we will be paying a terminal handling charge that will reflect the operating cost. The finance cap or debt component of the terminal handling charge is still at the original shipper’s account.

Given the operation of the finance cap (which has been reached, subject to further adjustment for Consumer Price Index, or CPI) there is a limit to the recovery by WICET of its financing costs from shippers. Accordingly, prior defaults referred to above have resulted in only minor increases to the terminal handling charges payable by the remaining shipper shareholders (including us). These increases have related to higher A$/ton (or U$/ton) charge for operating costs resulting from a lower contract base. If any of the remaining shipper shareholders becomes insolvent and/or defaults under its take-or-pay agreement, the terminal handling charges for the remaining shipper shareholders, including us, may increase proportionately to pay the defaulting shipper’s share of WICET’s operating and financing costs going forward (noting that the finance cap applies in respect of the financing costs component of the terminal handling charges).

In addition, if we default under the WICET Take-or-Pay Agreement and that default is not remedied, then we will be obligated to pay a termination payment. The termination payment is equal to the lesser of our proportion of WICET Pty Ltd’s total external debt (which is based on the proportion that our contracted tonnage bears to the total contracted tonnage at WICET when the payment obligation is triggered) and ten years equivalent terminal handling charges at the prevailing rate at the time that the termination payment falls due. We have provided security to WICET Pty Ltd in the form of a bank guarantee, the amount of which is required to cover our estimated liabilities as a shipper under the WICET Take-or-Pay Agreement for the following twelve-month period.

In the event of WICET Pty Ltd defaulting on its external debt obligations, external lenders to WICET Pty Ltd may enforce their rights to the security over the assets of WICET and appoint a receiver to take steps to recover outstanding debt. The external lenders do not have direct recourse to the shippers to recover outstanding debt and shipper take-or-pay agreements would remain on foot and access to the port would continue to be available to us.

In the event of a permanent cessation of operations at WICET, we may be required to procure additional port capacity elsewhere, as well as be liable for a termination payment under our take-or-pay agreement.

Risks related to the Supply Deed with Stanwell may adversely affect our financial condition and results of operations.

Curragh has a CSA, as amended from time to time, with Stanwell to supply thermal coal to the Stanwell Power Station. The CSA restricted Curragh from mining the SRA which was reserved for the benefit of Stanwell and could not be mined without Stanwell’s consent. Under the CSA, in addition to supplying thermal coal at a price below the cost to Curragh of mining and processing the coal, Curragh pays certain rebates to Stanwell on Met coal exported from certain parts of Curragh, which represents the deferred purchase cost of the right to mine some areas at Curragh. Our cost of supplying coal to Stanwell has been and may continue to be greater than the price paid by Stanwell.

Coronado Global Resources Inc. Form 10-K December 31, 2021 62


Table of Contents

 

On August 14, 2018, Curragh entered into the Supply Deed with Stanwell. The Supply Deed grants Curragh the right to mine the coal reserves in the SRA. In exchange for these rights, Curragh has agreed to certain amendments to the CSA and to enter into the NCSA, which will commence on or around the expiration of the CSA (currently expected to expire in 2027). On July 12, 2019, Curragh entered into the NCSA with Stanwell. Curragh agreed that the total value of the discount received by Stanwell on coal supplied to it under the NCSA should (by the expiry date of the NCSA) be equal to the net present value of A$210 million as at the date of the Supply Deed. No export rebates are payable during the term of the NCSA. The amortized cost of the deferred consideration was $230.5 million (A$317.7 million) as of December 31, 2021.

We could be adversely affected if we fail to appropriately provide financial assurances for our obligations.

Australian laws and U.S. federal and state laws require us to provide financial assurances related to requirements to reclaim lands used for mining, to pay federal and state workers’ compensation, to provide financial assurances for coal lease obligations and to satisfy other miscellaneous obligations. The primary methods we use to meet those obligations in the United States are to provide a third-party surety bond or provide a letter of credit. As of December 31, 2021, we provided $29.6 million of third-party surety bonds in connection with our U.S. Operations. There are no cash collateral requirements to support any of the outstanding bonds.

Our financial assurance obligations may increase due to a number of factors, including the size of our mining footprint and new government regulations, and we may experience difficulty procuring or renewing our surety bonds. In addition, our bond issuers may demand higher fees or additional collateral, including letters of credit or other terms less favorable to us upon those renewals. Because we are required by federal and state law to have these bonds or other acceptable security in place before mining can commence or continue, any failure to maintain surety bonds, letters of credit or other guarantees or security arrangements would adversely affect our ability to mine coal. That failure could result from a variety of factors, including lack of availability of surety bond or letters of credit, higher expense or unfavorable market terms, the exercise by third-party surety bond issuers of their right to refuse to renew the surety and the requirement to provide collateral for future third-party surety bond issuers under the terms of financing arrangements. If we fail to maintain adequate bonding, our mining permits could be invalidated, which would prevent mining operations from continuing, and future operating results could be materially adversely affected.

In Australia, the Financial Provisioning Act amends the financial assurance provisions of the Environmental Protection Act 1994 (Qld), and impacts the way that our Australian Operations must provision for and manage associated costs of providing financial assurances related to mine rehabilitation obligations.

The Financial Provisioning Act:

•amends the financial assurance arrangements for resource activities under the Environmental Protection Act 1994 (Qld) with a new financial provisioning scheme, and changes how the ERC for an environmental authority is calculated; and

•amends the Environmental Protection Act 1994 (Qld) to introduce new requirements for the progressive rehabilitation and closure of mined land.

Since April 1, 2019, any financial assurance currently held for environmental approvals already held in Australia are treated as surety under the Financial Provisioning Act. There will be a transition period of three years that commenced in early 2019 during which all miners in Queensland were assessed and received an initial risk allocation decision based on a formulaic calculation of their ERC. Our ERC is the cost estimated by the government department of rehabilitating the land on which our operation is carried out. This allocation will put our resource activity at Curragh into a risk category under the Financial Provisioning Act based on the regulator’s assessment of both the amount of our ERC and our financial capacity to carry out and discharge the rehabilitation liability and obligation at the time our mining operations cease. This risk assessment is reviewed annually, and assessment fees are payable each time there is an allocation decision for our operations in Queensland.

The new financial provisioning scheme is managed by the Scheme Manager and financial assurance is provided by paying a contribution to the Scheme and/or the giving of surety to the Scheme Manager. Our contribution is calculated as the prescribed percentage (dependent on risk allocation decision) of Curragh’s ERC. The prescribed percentages for each category are: (1) Very low: 0.5%; (2) Low: 1.0%; and (3) Moderate: 2.75%. In the event Curragh’s ERC is allocated a high risk allocation, we will be required to negotiate the percentage of surety to be provided with the Scheme Manager. The Scheme Manager is a statutory officer and manages the Scheme contributions and the sureties on behalf of the Queensland State Government.

Coronado Global Resources Inc. Form 10-K December 31, 2021 63


Table of Contents

 

In October 2021, the Scheme Manager completed the assessment of the Annual Review Allocation for environmental authority number EPML00643713 and issued an Annual Review Allocation of “Moderate”. The moderate rating results in Curragh being obliged to make a financial contribution to the Scheme of 2.75% of the ERC. In January 2022, the Scheme Manager completed an assessment of the Annual Review Allocation for Environmental Authority Number EPVX00635313 and issued an Annual Review Allocation of “High” in respect of MDL162 requiring Curragh to maintain its historical financial assurance in respect of 100% of the ERC for Environmental Authority Number EPVX00635313.

There can be no assurance that our risk category allocation will not change in future years.

Our financial assurance obligations may increase due to a number of factors, including but not limited to:

•any change that increases ERC or area of disturbance;

•any major Environmental Authority amendment;

•compliance with existing Environmental Authority obligations; and

•major changes to financial soundness of the EA Holder.

For more information on the Financial Provisioning Act, see Item 1. “Business—Regulatory Matters—Australia—Environmental Protection Act 1994 (Qld).”

Mine closures entail substantial costs. If we prematurely close one or more of our mines, our operations and financial performance would likely be affected adversely.

Federal and state regulatory agencies have the authority following significant health and safety incidents, such as fatalities, to order mining operations to be temporarily suspended or a facility be permanently closed. For example, on January 12, 2020, operations at our Curragh mine were temporarily suspended after a contractor was fatally injured during a tire change activity in the main workshop on site and on November 21, 2021, operations at our Curragh mine were temporarily suspended after an employee was fatally injured while working in the dragline operations. We could also be required to close or discontinue operations at particular mines before the end of their mine life due to environmental, geological, geotechnical, commercial, leasing or other issues. Such closure or discontinuance of operations could result in significant closure and rehabilitation expenses, employee redundancy costs, contractor demobilization costs and other costs or loss of revenues. If and when incurred, these closure and rehabilitation costs could exceed our current estimates. If one or more of our mines is closed earlier than anticipated, we would be required to fund the reclamation and closure costs on an expedited basis and potentially lose revenues and, for some of our operations, pay for take-or-pay arrangements that we no longer use, which would have an adverse impact on our operating and financial performance. Many of these costs could also be incurred if a mine was unexpectedly placed on care and maintenance before the end of its planned mine life such as our mines in the U.S. Operations, which were temporarily idled in 2020 as a result of the ongoing COVID-19 pandemic.

If the assumptions underlying our provision for reclamation and mine closure obligations prove to be inaccurate, we could be required to expend greater amounts than anticipated.

The Environmental Protection Act 1994 (Qld) and the SMCRA establish operational, reclamation and closure standards for all aspects of surface mining as well as deep mining. We accrue for the costs of current mine disturbance and final mine closure, including the cost of treating mine water discharge where necessary. Estimates of our total reclamation and mine-closing liabilities totaled $120.3 million as of December 31, 2021, based upon permit requirements and the historical experience at our operations, and depend on a number of variables involving assumptions and estimation and therefore may be subject to change, including the estimated future asset retirement costs and the timing of such costs, estimated proven reserves, assumptions involving third-party contractors, inflation rates and discount rates. If these accruals are insufficient or our liability in a future year is greater than currently anticipated, our future operating results and financial position could be adversely affected. See Item 7. “Management’s Discussion and Analysis of Financial Condition and Results of Operations—Critical Accounting Policies and Estimates.”

Coronado Global Resources Inc. Form 10-K December 31, 2021 64


Table of Contents

 

We are subject to foreign exchange risks involving certain operations in multiple countries.

Loss sustained from adverse movements in currency exchange rates can impact our financial performance and financial position and the level of additional funding required to support our businesses. Our financial results are reported in US$ and certain parts of our liabilities, earnings and cash flows are influenced by movements in exchange rates, especially movements in A$ to US$ exchange rate. For example, costs relating to our Australian Operations are generally denominated in A$. In addition, foreign currency exposures arise in relation to coal supply contracts, procurement of plant and equipment and debt, which may be priced in A$ or other foreign currencies other than US$.

The impact of currency exchange rate movements will vary depending on factors such as the nature, magnitude and duration of the movements, the extent to which currency risk is hedged under forward exchange contracts or other hedging instruments and the terms of these contracts. We may enter into forward exchange contracts to hedge a portion of our foreign currency exposure of our Australian Operations from time to time. The unhedged portion of our non-US$ exposures against exchange rate fluctuations will be at the risk of any adverse movement in exchange rates, which may affect our operating results, cash flows and financial condition.

Interest rates could change substantially and have an adverse effect on our profitability.

We are exposed to interest rate risk in relation to variable-rate bank balances and variable-rate borrowings. Our interest rate risk primarily arises from fluctuations in LIBOR and the Australian Bank Bill Swap Yield, or BBSY, in relation to US$- and A$-denominated borrowings, respectively. Our lending rates may increase in the future as a result of factors beyond our control and may result in an adverse effect on our financial condition and results of operations.

In addition, national and international regulators and law enforcement agencies have conducted investigations into a number of rates or indices, which are deemed to be “reference rates.” Actions by such regulators and law enforcement agencies may result in changes to the manner in which certain reference rates are determined, their discontinuance, or the establishment of alternative reference rates. For example, the United Kingdom’s Financial Conduct Authority, which regulates LIBOR, has announced that it will no longer compel banks to submit rates for the calculation of non-U.S.-dollar LIBOR after 2021. U.S-dollar LIBOR must be replaced before June 30, 2023. The Alternative Reference Rates Committee has proposed SOFR as its recommended alternative to LIBOR. At this time, it is not possible to predict the effect that these developments, any discontinuance, modification or other reforms to LIBOR or any other reference rate, or the establishment of alternative reference rates, including SOFR, may have on LIBOR or other benchmarks, including LIBOR-based borrowings under our variable-rate bank balances and variable-rate borrowings. Furthermore, the use of alternative reference rates or other reforms could cause the market value of, the applicable interest rate on and the amount of interest paid on our benchmark-based borrowings to be materially different than expected and could materially adversely impact our ability to refinance such borrowings or raise future indebtedness on a cost effective basis.

We may be unsuccessful in integrating the operations of acquisitions with our existing operations and in realizing all or any part of the anticipated benefits of any such acquisitions.

From time to time, we may evaluate and acquire assets and businesses that we believe complement our existing assets and business. Acquisitions may require substantial capital or the incurrence of substantial indebtedness. Our capitalization and results of operations may change significantly as a result of future acquisitions. Acquisitions and business expansions involve numerous risks, including the following:

•difficulties in the integration of the assets and operations of the acquired businesses;

•inefficiencies and difficulties that arise because of unfamiliarity with new assets and the businesses associated with them and new geographic areas;

•the diversion of management’s attention from other operations; and

•timing, and whether the acquisition or business expansion is occurring during adverse economic, social and regulatory periods.

Coronado Global Resources Inc. Form 10-K December 31, 2021 65


Table of Contents

 

Further, unexpected costs and challenges may arise whenever businesses with different operations or management are combined, and we may experience unanticipated delays in realizing the benefits of an acquisition. Entry into certain lines of business may subject us to new laws and regulations with which we are not familiar and may lead to increased litigation and regulatory risk. Also, following an acquisition, we may discover previously unknown liabilities associated with the acquired business or assets for which we have no recourse under applicable indemnification provisions. If a new business generates insufficient revenue or if we are unable to efficiently manage our expanded operations, our results of operations may be adversely affected.

Coronado Global Resources Inc. is a holding company with no operations of its own and, as such, it depends on its subsidiaries for cash to fund its operations and expenses, including future dividend payments, if any.

As a holding company, our principal source of cash flow is distributions from our subsidiaries. Therefore, our ability to fund and conduct our business, service our debt, and pay dividends, if any, in the future will depend on the ability of our subsidiaries to generate sufficient cash flow to make upstream cash distributions to us. Our subsidiaries are separate legal entities, and although they are wholly-owned and controlled by us, they have no obligation to make any funds available to us, whether in the form of loans, dividends, or otherwise. The ability of our subsidiaries to distribute cash to us will also be subject to, among other things, restrictions that may be contained in our subsidiary agreements (as entered into from time to time), availability of sufficient funds in such subsidiaries and applicable laws and regulatory restrictions. Claims of any creditors of our subsidiaries generally will have priority as to the assets of such subsidiaries over our claims and claims of our creditors and stockholders. To the extent the ability of our subsidiaries to distribute dividends or other payments to us is limited in any way, our ability to fund and conduct our business, service our debt, and pay dividends, if any, could be harmed.

Legal, Compliance and Sustainability Risks

We are subject to extensive health and safety laws and regulations that could have a material adverse effect on our reputation and financial condition and results of operations.

We are subject to extensive laws and regulations governing health and safety at coal mines in the United States and Australia. As a result of increased stakeholder focus on health and safety issues (such as black lung disease or coal workers’ pneumoconiosis), there is a risk of legislation and regulatory change that may increase our exposure to claims arising out of current or former activities or result in increased compliance costs (e.g., through requiring improved monitoring standards or contribution to an industry-pooled fund). Regulatory agencies also have the authority, following significant health and safety incidents, such as fatalities, to order mining operations to be temporarily suspended or the facility be permanently closed. For example, For example, on January 12, 2020, operations at our Curragh mine were temporarily suspended after a contractor was fatally injured during a tire change activity in the main workshop on site and on November 21, 2021, operations at our Curragh mine were temporarily suspended after an employee was fatally injured while working in the dragline operations.. If further serious safety incidents were to occur at any of our mining facilities in the future, it is possible that a regulator might impose a range of conditions on re-opening of a facility, including requiring capital expenditures, which could have an adverse effect on our reputation, financial condition and results of operations.

For additional information about the various regulations affecting us, see Item 1. “Business—Regulatory Matters—Australia” and “Business—Regulatory Matters—United States.”

We could be negatively affected if we fail to maintain satisfactory labor relations.

Relations with our employees and, where applicable, organized labor are important to our success. Enterprise bargaining and other disputes between us and our employees or disputes affecting our contractors may result in strikes or uncompetitive work practices.

As of December 31, 2021, we had 1,577 employees. In addition, as of December 31, 2021, there were 1,848 contractors supplementing the permanent workforce, primarily at Curragh. As of December 31, 2021, approximately 12% of our total employees, all at our Australian Operations, were represented by organized labor unions and covered by the EA. In May 2019, the Australian Fair Work Commission approved the Curragh Mine Enterprise Agreement 2019. This EA has a nominal expiration date of May 26, 2022 and will remain in place until replaced or terminated by the Fair Work Commission. Our U.S. Operations employ a 100% non-union labor force.

Future industrial action by our employees or mining contractors’ employees or involving trade unions could disrupt operations and negatively impact mine productivity, production and profitability.

Coronado Global Resources Inc. Form 10-K December 31, 2021 66


Table of Contents

 

Our operations may impact the environment or cause exposure to hazardous substances, which could result in material liabilities to us.

We are subject to extensive environmental laws and regulations, and our operations may substantially impact the environment or cause exposure to hazardous materials to our contractors, our employees or local communities. We use hazardous materials and generate hazardous or other regulated waste, which we store in our storage or disposal facilities. We may become subject to statutory or common law claims (including damages claims) as a result of our use of hazardous materials and generation of hazardous waste. A number of laws, including, in the United States, the CERCLA or Superfund, and the RCRA, and in Australia, the Environmental Protection Act 1994 (Qld), impose liability relating to contamination by hazardous substances. Furthermore, the use of hazardous materials and generation of hazardous and other waste may subject us to investigation and require the clean-up of soil, surface water, groundwater and other media.

Mining operation process, including blasting and processing ore bodies, can also generate environmental impacts. These impacts include, but are not limited to, leakages of polluting substances, explosions, flooding, fires, accidental mine water discharges, and excessive dust and noise. Such risks could result in damage to the applicable mine site, personal injury to our employees and contractors, environmental damage, decreased coal production and possible legal liability under environmental regulations. Employee or strict liability claims under common law or environmental regulations in relation to these matters may arise, for example, out of current or former activities at sites that we own, lease or operate and at properties to which hazardous substances have been sent for treatment, storage, disposal or other handling. Our liability for such claims may be strict, joint and several with other miners or parties or with our contractors, such that we may be held responsible for more than our share of the contamination or other damages, or even for the entire amount of damages assessed. Additionally, any violations of environmental laws by us could lead to, among other things, the imposition on us of substantial fines, penalties, other civil and criminal sanctions, the curtailment or cessation of operations, orders to pay compensation, orders to remedy the effects of violations and take preventative steps against possible future violations, increased compliance costs, or costs for environmental remediation, rehabilitation or rectification works.

We maintain extensive Met coal refuse areas and slurry impoundments at our mining properties. At Curragh, coal slurry is disposed of by pumping into an impoundment area where particles are allowed to settle. We have procedures in place that the Curragh slurry impoundments remain below the surrounding topography so that there is minimal likelihood of failure and/or spills. At our U.S. Operations, refuse areas and impoundments are frequently inspected and subject to extensive governmental regulation. Slurry impoundments have been known to fail, releasing large volumes of coal slurry into the surrounding environment. Structural failure of an impoundment can result in extensive damage to the environment and natural resources, such as bodies of water that the coal slurry reaches, as well as create liability for related personal injuries, property damages and injuries to natural resources and plant and wildlife. Of the six refuse areas among our U.S. mining properties, only three impound slurry; the other facilities are combined refuse and do not impound slurry. Four of our impoundments in the U.S. overlie mined out areas, which can pose a heightened risk of failure and the assessment of damages arising out of such failure. If one of our impoundments were to fail, we could be subject to substantial claims for the resulting environmental contamination and associated liability, as well as for related fines and penalties.

Concerns about the environmental impacts of coal combustion, including perceived impacts on global climate issues, are resulting in increased regulation of coal combustion and coal mining in many jurisdictions, which could significantly affect demand for our products or our securities.

Global concerns about climate change continues to attract considerable attention, particularly in relation to the coal industry. Emissions from coal consumption, both directly and indirectly, and emissions from coal mining itself are subject to pending and proposed regulation as part of initiatives to address global climate change. A number of countries, including Australia and the United States, have already introduced, or are contemplating the introduction of, regulatory responses to GHGs, including the extraction and combustion of fossil fuels, to address the impacts of climate change.

Coronado Global Resources Inc. Form 10-K December 31, 2021 67


Table of Contents

 

There are three primary sources of GHGs associated with the coal industry. First, the end use of our coal by our customers in coal-fired electricity generation, coke plants, and steelmaking. Second, combustion of fuel by equipment used in coal production and to transport our coal to our customers. Third, coal mining itself can release methane, which is considered to be a more potent GHG than carbon dioxide, directly into the atmosphere. These emissions from coal consumption, transportation and production are subject to pending and proposed regulation, in the jurisdictions in which we operate as part of initiatives to address global climate change.

As a result, numerous proposals have been made and are likely to continue to be made at the international, national, regional and state levels of government to monitor and limit emissions of GHGs. In November 2014, an agreement was announced between the United States and China to cut GHGs by more than 25% below 2005 levels by 2025. This agreement was followed by the UNFCCC, conference in Paris, France, in which an agreement was adopted calling for voluntary emissions reductions contributions, or the Paris Agreement. The Paris Agreement was entered into force on November 4, 2016 after ratification and execution by more than 55 countries, which account for at least 55% of global GHG emissions. The Paris Agreement was signed by representatives from 195 countries and aims to hold back the increase in global temperatures, increase the ability of countries to adapt to the adverse impacts of climate change and provide channels to finance projects that lead to GHG reductions.

On November 13, 2021, the Glasgow Conference of Parties 26, or COP26, agreed on the language around fossil fuels in the final Glasgow Climate Pact. A call on countries to “phase out” coal power was changed to “phase down of unabated coal power”, that is coal power that does not include the capture and storage of carbon dioxide emission. 190 countries have now agreed to phase down coal power. 65 countries have now committed to coal phase out, including more than 20 new commitments at COP26. 48 countries are members of the PPCA. All major coal financing countries have committed to end international coal finance by the end of 2021. As a result, Glasgow COP26 is expected to accelerate the trend of higher finance and insurance costs for coal miners and coal-fired power generators. The agreement on carbon accounting has also made global trade in carbon more likely, eventually accelerating the competitiveness of low-carbon solutions in the power and steel sectors.

In addition, the growth of alternative energy options, such as renewables and disruptive power generation technologies, changes in community or government attitudes to climate change, government measures to subsidize renewable energy production while reducing subsidies for the fossil fuel industry, efforts to promote divestment of fossil fuel equities and pressure from lenders to limit funding to fossil fuel companies could result in further development of alternative energy industries and broader mainstream acceptance of alternative energy options which could result in a material reduction in the demand for coal. It could also result in reduced access to capital to fund our activities as lenders and investors divert capital to low emission sectors of the economy.

The absence of regulatory certainty, global policy inconsistencies and direct regulatory impacts (such as carbon taxes or other charges) each have the potential to adversely affect our operations—either directly or indirectly, through suppliers and customers. Collectively, these initiatives and developments could result in higher electricity costs to us or our customers or lower the demand for coal used in electricity generation, which could in turn adversely impact our business.

At present, we are principally focused on Met coal production, which is not used in connection with the production of coal-fired electricity generation. The market for our coal may be adversely impacted if comprehensive legislation or regulations focusing on GHG emission reductions are adopted, particularly if they directly or indirectly impact the Met coal industry, or if our ability to obtain capital for operations is materially reduced.

We and our customers may also have to invest in carbon, capture, usage and storage technologies in order to burn thermal coal and comply with future GHG emission standards. The potential direct and indirect financial impact on us of future laws, regulations, policies and technology developments may depend upon the degree to which any such laws, regulations and developments force reduced reliance on coal as a fuel source. Such developments could result in adverse impacts on our financial condition or results of operations. See Item 1. “Business—Regulatory Matters—Australia” and “Business—Regulatory Matters—United States.”

Coronado Global Resources Inc. Form 10-K December 31, 2021 68


Table of Contents

 

Changes in and compliance with government policy, regulation or legislation may adversely affect our financial condition and results of operations.

The coal mining industry is subject to regulation by federal, state and local authorities in each relevant jurisdiction with respect to a range of industry specific and general matters. Any future legislation and regulatory change imposing more constraints or more stringent requirements may affect the coal mining industry and may adversely affect our financial condition and results of operations. Examples of such changes are, future laws or regulations that may limit the emission of GHGs or the use of thermal coal in power generation, more stringent workplace health and safety laws, more rigorous environmental laws, and changes to existing taxation and royalty legislation.

Compliance with applicable federal, state and local laws and regulations may become more costly and time-consuming and may delay commencement or interrupt continuation of exploration or production at our operations. We have incurred, and may in the future incur, significant expenditures to comply with such regulation and legislation. These laws are constantly evolving and may become increasingly stringent. The ultimate impact of complying with existing laws and regulations is not always clearly known or determinable due in part to the fact that certain implementation of the regulations for these laws have not yet been promulgated and in certain instances are undergoing revision. These laws and regulations, particularly new legislative or administrative proposals (or judicial interpretations of existing laws and regulations), could result in substantially increased capital, operating and compliance costs and could have a material adverse effect on our operations and our customers’ ability to use our products. Due in part to the extensive and comprehensive regulatory requirements, along with changing interpretations of these requirements, violations of applicable federal, state and local laws and regulations occur from time to time in the coal industry and minor violations have occurred at our Australian Operations and our U.S. Operations in the past.

Moreover, changes in the law may impose additional standards and a heightened degree of responsibility for us and our stockholders, directors and employees; may require unprecedented compliance efforts; could divert our management’s attention; and may require significant expenditures. For example, we may also be subject to unforeseen environmental liabilities resulting from coal-related activities, which may be costly to remedy or adversely impact our operations. In particular, the acceptable level of pollution and the potential abandonment costs and obligations for which we may become liable as a result of our activities may be difficult to assess under the current legal framework. To the extent that required expenditures, as with all costs, are not ultimately reflected in the prices of coal, our operating results will be detrimentally impacted. The costs and operating restrictions necessary for compliance with safety and environmental laws and regulations, which is a major cost consideration for our Australian Operations and U.S. Operations, may have an adverse effect on our competitive position relative to foreign producers and operators in other countries which may not be required to incur equivalent costs in their operations.

We are also affected by various other international, federal, state, local and tribal or indigenous environmental laws and regulations that impact our customers. To the extent that such environmental laws and regulations reduce customer demand for or increase the price of coal, we will be detrimentally impacted. For additional information about the various regulations affecting us, see Item 1. “Business—Regulatory Matters—Australia” and “Business—Regulatory Matters—United States.”

Coronado Global Resources Inc. Form 10-K December 31, 2021 69


Table of Contents

 

Failure to comply with applicable anti-corruption and trade laws, regulations and policies could result in fines and criminal penalties, causing a material adverse effect on our business, operating and financial prospects or performance.

Any fraud, bribery, misrepresentation, money laundering, violations of applicable trade sanctions, anti-competitive behavior or other misconduct by our employees, contractors, customers, service providers, business partners and other third parties could result in violations of relevant laws and regulations by us and subject us or relevant individuals to corresponding regulatory sanctions or other claims, and could also result in an event of default under our financing arrangements. These unlawful activities and other misconduct may have occurred in the past and may occur in the future and may result in civil and criminal liability under increasingly stringent laws relating to fraud, bribery, sanctions, competition and misconduct or cause serious reputational or financial harm to us. In addition, failure to comply with environmental, health or safety laws and regulations, privacy laws and regulations, U.S. trade sanctions, the U.S. Foreign Corrupt Practices Act and other applicable laws or regulations could result in litigation, the assessment of damages, the imposition of penalties, suspension of production or distribution, costly changes to equipment or processes due to required corrective action, or a cessation or interruption of operations.

We have policies and procedures to identify, manage and mitigate legal risks and address regulatory requirements and other compliance obligations. However, there can be no assurance that such policies, procedures and established internal controls will adequately protect us against fraudulent or corrupt activity and such activity could have an adverse effect on our reputation, financial condition and results of operations.

We are subject to extensive forms of taxation, which imposes significant costs on us, and future regulations and developments could increase those costs or limit our ability to produce coal competitively.

Federal, state or local governmental authorities in nearly all countries across the global coal mining industry impose various forms of taxation on coal producers, including production taxes, sales-related taxes, royalties, stamp duty, environmental taxes and income taxes.

Included within acquisition related accruals in our Consolidated Balance Sheet, included in this Annual Report on Form 10-K, is an amount outstanding for stamp duty payable on the Curragh Acquisition of $31.2 million (A$ 43.0 million). This amount was outstanding as at December 31, 2021 and December 31, 2020, respectively, pending assessment by the Queensland Revenue Office, or QRO, in Queensland, Australia. The QRO has not yet provided any formal assessment of the stamp duty amount, although it has indicated that in its view, stamp duty may be assessed on the Curragh Acquisition, unencumbered by the Stanwell arrangements. As a result, the assessment of the stamp duty payable could potentially be higher than the amount provided for. The Company considers its position at December 31, 2021, as accounted for, is appropriate and the Company will vigorously challenge any assessment on the above basis.

If new legislation or regulations related to various forms of coal taxation or income or other taxes generally, which increase our costs or limit our ability to compete in the areas in which we sell coal, or which adversely affect our key customers, are adopted, or if the basis upon which such duties or taxes are assessed or levied, changes or is different from that provided by us, our business, financial condition or results of operations could be adversely affected.

We may be subject to litigation, the disposition of which could negatively affect our profitability and cash flow in a particular period, or have a material adverse effect on our business, financial condition and results of operations.

Our profitability or cash flow in a particular period could be affected by an adverse ruling in any litigation that may be filed against us in the future. In addition, such litigation could have a material adverse effect on our business, financial condition and results of operations. See Item 3. “Legal Proceedings.”

Coronado Global Resources Inc. Form 10-K December 31, 2021 70


Table of Contents

 

We have no registered trademarks for our Company name or other marks used by us in the United States or any other countries, and failure to obtain those registrations could adversely affect our business.

Although we have filed a trademark application for use of the stylized mark “CORONADO STEEL STARTS HERE” in the United States and Australia, our applications are still pending and the corresponding mark has not been registered in the United States or Australia. We have not filed for this or other trademarks in any other country. During trademark registration proceedings, we may receive rejections. If so, we will have an opportunity to respond, but we may be unable to overcome such rejections. In addition, Intellectual Property Australia and the United States Patent and Trademark Office and comparable agencies in many foreign jurisdictions may permit third parties to oppose pending trademark applications and to seek to cancel registered trademarks. If opposition or cancellation proceedings are filed against our trademark application, our trademark may not survive such proceedings, and/or we may be required to expend significant additional resources in an effort to defend ourselves in the proceedings or identify a suitable substitute mark for future use.

Risks Specific to Our Common Stock

Our certificate of incorporation and bylaws include provisions that may discourage a change in control.

Provisions contained in our amended and restated certificate of incorporation, or certificate of incorporation, and amended and restated bylaws, or bylaws, and Delaware law could make it more difficult for a third-party to acquire us, even if doing so might be beneficial to our stockholders. Provisions of our bylaws and certificate of incorporation impose various procedural and other requirements that could make it more difficult for stockholders to effect certain corporate actions.

We have elected not to be governed by Section 203 of the General Corporation Law of the State of Delaware, or the DGCL, (or any successor provision thereto), until immediately following the time at which the EMG Group no longer beneficially owns in the aggregate shares of our common stock representing at least 10% of our voting stock, in which case we shall thereafter be governed by Section 203 if and for so long as Section 203 by its terms would apply to us. Section 203 provides that an interested stockholder, along with its affiliates and associates (i.e., a stockholder that has purchased greater than 15%, but less than 85%, of a company’s outstanding voting stock (with some exclusions)), may not engage in a business combination transaction with the company for a period of three years after buying more than 15% of a company’s outstanding voting stock unless certain criteria are met or certain other corporate actions are taken by the company.

These provisions could limit the price that certain investors might be willing to pay in the future for shares of our common stock and may have the effect of delaying or preventing a change in control.

Our certificate of incorporation limits the personal liability of our directors for certain breaches of fiduciary duty.

Our certificate of incorporation and bylaws include provisions limiting the personal liability of our directors for breaches of fiduciary duty under the DGCL. Specifically, our certificate of incorporation contains provisions limiting a director’s personal liability to us and our stockholders to the fullest extent permitted by the DGCL. Furthermore, our certificate of incorporation provides that no director shall be liable to us and our stockholders for monetary damages resulting from a breach of fiduciary duty as a director, except to the extent that such exemption from liability or limitation thereof is not permitted under the DGCL. The principal effect of this limitation on liability is that a stockholder will be unable to prosecute an action for monetary damages against a director unless the stockholder can demonstrate a basis for liability that cannot be eliminated under the DGCL. These provisions, however, should not limit or eliminate our right or any stockholder’s right to seek non-monetary relief, such as an injunction or rescission, in the event of a breach of a director’s fiduciary duty. These provisions do not alter a director’s liability under U.S. federal securities laws. The inclusion of these provisions in our certificate of incorporation may discourage or deter stockholders or management from bringing a lawsuit against directors for a breach of their fiduciary duties, even though such an action, if successful, might otherwise have benefited us and our stockholders.

Coronado Global Resources Inc. Form 10-K December 31, 2021 71


Table of Contents

 

Coronado Group LLC and the EMG Group have substantial control over us and are able to influence corporate matters.

Coronado Group LLC and the EMG Group have significant influence over us, including control over decisions that require the approval of stockholders, which could limit the ability of other stockholders to influence the outcome of stockholders votes.

As of December 31, 2021, the EMG Group indirectly held 50.4% of our outstanding shares of common stock. Therefore, the EMG Group has effective control over the outcome of votes on all matters requiring approval by stockholders. There is a risk that the interests of the EMG Group could conflict with or differ from our interests or the interests of other stockholders. In addition, pursuant to the terms of the Stockholder’s Agreement, dated as of September 24, 2018, between us and Coronado Group LLC, or the Stockholder’s Agreement, so long as it beneficially owns in the aggregate at least 25% of the outstanding shares of our common stock, the EMG Group will have the ability to exercise substantial control over certain of our transactions, including change of control transactions, such as mergers and capital and debt raising transactions. See Item 5. “Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities” for a description of the Stockholder’s Agreement.

Further, pursuant to the terms of the Series A Share, Coronado Group and the EMG Group or its successors or permitted assigns, as the beneficial owner of the Series A Share, at its option, will have the ability to elect a specified number of directors, or the Series A Directors, based on the EMG Group’s aggregate level of beneficial ownership of shares of our common stock. For more details on the ability of Coronado Group and the EMG Group to elect Series A Directors, as well as the rights of stockholders to participate in the removal of any such Series A Directors, see Item 5. “Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities.”

Moreover, the EMG Group’s beneficial ownership of shares of our common stock may also adversely affect the price of our common stock to the extent equity investors perceive disadvantages in owning common stock of a company with a controlling stockholder. In addition, the EMG Group is in the business of making investments in companies and may, from time to time, acquire interests in businesses that directly or indirectly compete with us, as well as businesses of our existing or potential significant customers. The EMG Group may acquire or seek to acquire assets that we seek to acquire and, as a result, those acquisition opportunities may not be available to us or may be more expensive for us to pursue, and as a result, the interests of the EMG Group may not align with the interests of our other stockholders.

The EMG Group has the right, subject to certain conditions, to require us to cooperate in a sale of shares of our common stock held by it (including in the form of CDIs) under the Securities Act.

Pursuant to the Registration Rights and Sell-Down Agreement, dated as of September 24, 2018, between us and Coronado Group LLC, or the Registration Rights and Sell-Down Agreement, Coronado Group LLC (or its successors or permitted assigns or transferees) has the right, subject to certain conditions, to require us to cooperate in a sell-down of shares of our common stock or CDIs held by it. By virtue of its majority ownership, exercising its registration rights and selling a large number of shares or CDIs, Coronado Group LLC could cause undue volatility in the prevailing market price of our common stock. See Item 5. “Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities.”

Our non-employee directors and their respective affiliates, including the EMG Group, may be able to take advantage of a corporate opportunity that would otherwise be available to us.

The corporate opportunity and related party transactions provisions in our certificate of incorporation could enable any of our non-employee directors or their respective affiliates, including the EMG Group, to benefit from corporate opportunities that might otherwise be available to us. Subject to the limitations of applicable law, our certificate of incorporation, among other things, will:

•permit us to enter into transactions with entities in which one or more non-employee directors are financially or otherwise interested;

•permit any non-employee director or his or her affiliates to conduct a business that competes with us and to make investments in any kind of property in which we may make investments; and

Coronado Global Resources Inc. Form 10-K December 31, 2021 72


Table of Contents

 

•provide that if any non-employee director becomes aware of a potential business opportunity, transaction or other matter (other than one expressly offered to that non-employee director solely in his or her capacity as our director), that non-employee director will have no duty to communicate or offer that opportunity to us, and will be permitted to communicate or offer that opportunity to his or her affiliates and pursue or acquire such opportunity for himself or herself, and that non-executive director will not be deemed to have acted in a manner inconsistent with his or her fiduciary or other duties to us or our stockholders regarding the opportunity or acted in bad faith or in a manner inconsistent with our and our stockholders’ best interests.

These provisions enable a corporate opportunity that would otherwise be available to us to be taken by or used for the benefit of the non-employee directors or their respective affiliates, which include the EMG Group as a result of the rights granted to it under the Stockholder’s Agreement.

General Risk Factors

Any failure to maintain effective internal control over financial reporting may adversely affect our financial condition and results of operations.

Our management is responsible for establishing and maintaining adequate internal control over financial reporting. Internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements in accordance with generally accepted accounting principles in the United States, or U.S. GAAP.

During the course of the preparation of our financial statements, we evaluate and correct any deficiencies in our internal controls over financial reporting. If we fail to maintain an effective system of disclosure or internal controls over financial reporting, including satisfaction of the requirements of Section 404 of the Sarbanes-Oxley Act of 2002, we may not be able to report accurately or timely on our financial results or adequately identify and reduce fraud. Therefore, the financial condition of our business could be adversely affected, current and potential future stockholders could lose confidence in us and/or our reported financial results, which may cause a negative effect on the trading price of our CDIs, and we could be exposed to litigation or regulatory proceedings, which may be costly or divert management attention.

The requirements of being a public company in the United States and Australia may strain our resources, divert management’s attention, and affect our ability to attract and retain executive management and qualified board members.

Our CDIs are currently listed on the ASX and we are registered as a foreign company in Australia. As such we need to ensure continuous compliance with relevant Australian laws and regulations, including the listing rules of the ASX, as amended from time to time, or the ASX Listing Rules, and certain provisions of the Corporations Act 2001 (Cth), or the Corporations Act.

As a U.S. public company, we are subject to the reporting requirements of the Exchange Act, the Sarbanes-Oxley Act of 2002, the Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010 and other applicable securities laws, rules and regulations. Compliance with these laws, rules, and regulations may increase our legal and financial compliance costs, make some activities more difficult, time-consuming, or costly, and increase demand on our systems and resources. The Exchange Act requires, among other things, that we file annual, quarterly, and current reports with respect to our business and results of operations. In the absence of a waiver from the ASX Listing Rules, these SEC periodic reports will be in addition to our periodic filings required by the ASX Listing Rules. The Sarbanes-Oxley Act of 2002 requires, among other things, that we maintain effective disclosure controls and procedures and internal control over financial reporting. In order to maintain and, if required, improve our disclosure controls and procedures and internal control over financial reporting to meet this standard, significant resources and management oversight will be required. As a result, management’s attention may be diverted from other business concerns and our costs and expenses will increase, which could harm our business and results of operations, all of which could be magnified during the ongoing COVID-19 pandemic. We may need to hire more employees in the future or engage outside consultants, which will increase our costs and expenses.

Coronado Global Resources Inc. Form 10-K December 31, 2021 73


Table of Contents

 

In addition, changing laws, regulations, and standards relating to corporate governance and public disclosure are creating uncertainty for public companies, increasing legal and financial compliance costs and making some activities more time consuming. These laws, regulations and standards are subject to varying interpretations, in many cases due to their lack of specificity and, as a result, their application in practice may evolve over time as new guidance is provided by regulatory and governing bodies. This could result in continuing uncertainty regarding compliance matters and higher costs necessitated by ongoing revisions to disclosure and governance practices. We intend to invest resources to comply with evolving laws, regulations and standards, and this investment may result in increased general and administrative expenses and a diversion of management’s time and attention from sales-generating activities to compliance activities. If our efforts to comply with new laws, regulations and standards differ from the activities intended by regulatory or governing bodies due to ambiguities related to their application and practice, regulatory authorities may initiate legal, administrative or other proceedings against us and our business may be harmed.

A state court located within the State of Delaware (or, if no state court located within the State of Delaware has jurisdiction, the federal district court for the District of Delaware) will be, to the extent permitted by law, the sole and exclusive forum for substantially all state law based disputes between us and stockholders.

Our bylaws provide that, unless we consent in writing to the selection of an alternative forum, a state or federal court within the State of Delaware will be the sole and exclusive forum for:

•any derivative action or proceeding brought on our behalf;

•any action or proceeding asserting a claim of breach of a fiduciary duty owed by any director or officer or other employee or agent of the Company to the Company or the Company’s stockholders or debtholders;

•any action or proceeding asserting a claim against the Company or any director or officer or other employee or agent of the Company arising pursuant to any provision of the DGCL or our certificate of incorporation or bylaws; or

•any action asserting a claim against the Company or any director or officer or other employee of the Company governed by the internal affairs doctrine or other “internal corporate claims” as defined in Section 115 of the DGCL.

The choice of forum provision may limit a stockholder’s ability to bring a claim against us or our directors, officers, employees or agents in a forum that it finds favorable, which may discourage stockholders from bringing such claims at all. Alternatively, if a court were to find the choice of forum provision contained in our bylaws to be inapplicable or unenforceable in an action, we may incur additional costs associated with resolving such action in another forum, which could materially adversely affect our business, financial condition and results of operations. However, the choice of forum provision does not apply to any actions arising under the Securities Act or the Exchange Act.

The issuance of additional common stock or securities convertible into our common stock could result in dilution of the ownership interest in us held by existing stockholders.

We may issue more CDIs in the future in order to fund future investments, acquisitions, capital raising transactions or to reduce our debt. While we will be subject to the constraints of the ASX Listing Rules regarding the percentage of our capital that we are able to issue within a 12-month period (subject to applicable exceptions), any such equity raisings may dilute the ownership of existing common stockholders.

We are subject to general market risks that are inherent to companies with publicly-traded securities and the price of our securities may be volatile.

We are subject to the general market risks that are inherent in all securities traded on a securities exchange. This may result in fluctuations in the trading price of our securities that are not explained by our fundamental operations and activities. There is no guarantee that the price of our securities will increase in the future, even if our earnings increase.

Our securities may trade at, above or below the price paid by an investor for those securities due to a number of factors, including, among others:

•general market conditions, including investor sentiment;

Coronado Global Resources Inc. Form 10-K December 31, 2021 74


Table of Contents

 

•movements in interest and exchange rates;

•fluctuations in the local and global market for listed stocks;

•actual or anticipated fluctuations in our interim and annual results and those of other public companies in our industry;

•industry cycles and trends;

•mergers and strategic alliances in the coal industry;

•changes in government regulation;

•potential or actual military conflicts or acts of terrorism;

•changes in accounting principles;

•announcements concerning us or our competitors;

•changes in government policy, legislation or regulation;

•inclusion of our securities in or removal from particular market indices (including S&P/ASX indices); and

•the nature of the markets in which we operate.

Other factors that may negatively affect investor sentiment and influence us, specifically, or the stock market, more generally, include acts of terrorism, an outbreak of international hostilities, fires, floods, earthquakes, labor strikes, civil wars, natural disasters, outbreaks of disease, such as the ongoing COVID-19 pandemic, or other man-made or natural events.

Stock markets have experienced extreme price and volume fluctuations in the past that are often disproportionate or unrelated to the operating performance of companies. There can be no guarantee that trading prices and volumes of any securities will be sustained. These factors may materially affect the market price of our securities, regardless of our operational performance. This may then significantly impact our ability to raise new equity which may be required to fund our operations if our financial performance deteriorates due to other factors.

The payment of dividends and repurchases of our stock are dependent on a number of factors, and future payments and repurchases cannot be assured.

The payment of dividends in respect of our common stock is impacted by several factors, including our profitability, retained earnings, capital requirements and free cash flow, as well as applicable covenants under the indenture governing our senior secured notes and covenants under the ABL Facility. Any future dividends will be determined by our Board of Directors having regard to these factors, among others. There is no guarantee that any dividend will be paid, or repurchases will be made, by us, or if paid, paid at historic levels. From time to time, our Board of Directors may also cancel previously announced dividends.

Coronado Global Resources Inc. Form 10-K December 31, 2021 75


Table of Contents

 

ITEM 1B. UNRESOLVED STAFF COMMENTS

None.

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 76


Table of Contents

 

ITEM 2. PROPERTIES

Summary Overview of Mining Operations

Coronado owns and controls a portfolio of operating mines and development projects in Queensland, Australia, and Virginia, West Virginia and Pennsylvania in the United States. Our Australian Operations consist of the 100%-owned Curragh producing mine complex. With respect to our U.S. Operations, Coronado owns a 100% interest in two producing mine complexes (Buchanan and Logan) and a 100% interest in one temporarily idled, production-stage mine complex (Greenbrier) and two development properties (Mon Valley (formerly called Pangburn-Shaner-Fallowfield) and Russell County). Figures 1 and 2 below show the locations of our mining properties in Australia and the United States, respectively.

Figure 1: Australian Operations:

 

Picture 1

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 77


Table of Contents

 

Figure 2: U.S. Operations:

Picture 4

For the years ended December 31, 2019, 2020 and 2021, our mines produced an aggregate of 20.2 MMt, 17.0 MMt and 17.4 MMt of coal, respectively. See the descriptions of our material mining properties under “—Curragh,” “—Buchanan,” “—Logan” and “—Mon Valley” below for more information. Table 1 below contains a summary of the key information relative to the various Coronado properties. Tables 2 and 3 provide a summary of our coal resources and reserves, respectively, as of December 31, 2021.

Coronado Global Resources Inc. Form 10-K December 31, 2021 78


Table of Contents

 

Table 1. Summary Coronado Properties

Property (Property Stage)

 

Mineral Rights(1)

 

Permit Status(2)

 

Mine Type(s)

 

Coal Type

 

Coal Seams of Economic Interest (Formation)

 

Processing Plants/

Facilities

Curragh (Production)

 

25,586 hectares leased; 6,381 hectares owned

 

Permitted

 

Surface

 

HCC, SCC, PCI, Thermal

 

Various (Rangal Coal Measures)

 

CPP1 - 1100 raw Mt per hour; CPP2 - 1200 raw Mt per hour; Rail Loadout

Buchanan (Production)

 

26,243 hectares leased(3); 7,846 hectares owned

 

1 Permit

 

Underground

 

Low-Vol

 

Pocahontas #3 (Pocahontas Formation)

 

CPP - 1270 raw Mt per hour; Rail Loadout

Logan (Production)

 

13,069 hectares leased(3); 69 hectares owned

 

25 Permits

 

Surface & Underground

 

HVA, HVB, Thermal

 

Various (Kanawha Formation)

 

CPP – 1088 raw Mt per hour; Rail Loadout

Mon Valley (Development)

 

1,339 hectares leased(3); 40,276 hectares owned

 

Not Permitted

 

Underground(4)

 

High-Vol

 

Upper Freeport (Freeport Formation)

 

Future

Greenbrier (Production - Idled)

 

18,907 hectares leased(3)

 

26 Permits

 

Surface & Underground

 

Mid-Vol, PCI, Thermal

 

Pocahontas #6, #7, #8 (Pocahontas Formation); Various (New River Formation)

 

CPP - 544 raw Mt per hour; Rail Loadout

Russell County (Development)

 

7,111 hectares leased(3); 378 hectares owned

 

Not Permitted

 

Underground(4)

 

High-Vol

 

Lower Castle (Norton Formation); Upper Horsepen (Middle Lee Formation)

 

Future

(1) We are not aware of any significant encumbrances or defects in title with respect to any of our mining properties. Certain credit facilities of the Company are secured by a lien on substantially all of the Company’s assets, including mining properties.

(2) We believe we have secured all applicable environmental licenses and permits under applicable law and have all necessary permits and licenses regarding cultural heritage, native title and various other social issues to support current mining operations.

(3) Subject to the exercise of our renewal rights thereunder, most of the leases at our U.S. mining properties expire upon exhaustion of the relevant reserves.

(4) Proposed mine type.

Coronado Global Resources Inc. Form 10-K December 31, 2021 79


Table of Contents

 

Table 2. Summary Coal Resources Exclusive of Reserves at End of the Fiscal Year Ended December 31, 2021.(1)

 

 

Coal Resources (In Situ, MMt)(2)

 

Quality (Air-Dried Basis)

 

 

Measured

 

Indicated

 

Measured

+

Indicated

 

Inferred

 

Ash

 

Sulfur

 

Volatile Matter

Australia

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Curragh

 

328

 

184

 

512

 

142

 

19.5%

 

0.5%

 

18.4%

Total Australia

 

328

 

184

 

512

 

142

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

United States

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Buchanan

 

11

 

4

 

15

 

—

 

25.0%

 

0.7%

 

16.0%

Logan

 

46

 

37

 

83

 

3

 

24.0%

 

1.0%

 

28.0%

Mon Valley

 

—

 

—

 

—

 

—

 

—

 

—

 

—

Greenbrier

 

19

 

14

 

33

 

—

 

31.0%

 

1.1%

 

20.0%

Russell County

 

40

 

4

 

44

 

—

 

29.0%

 

0.7%

 

23.0%

Total United States

 

116

 

59

 

175

 

4

 

 

 

 

 

 

Total

 

444

 

243

 

687

 

147

 

 

 

 

 

 

(1) For more information regarding price assumptions used in the calculation of coal resources as of December 31, 2021, see the individual property disclosures below.

(2) Australian resources are estimated inclusive of 5.3% in-situ moisture. United States resources are estimated on a dry basis.

 

Table 3. Summary Coal Reserves (Marketable Sales Basis) at End of the Fiscal Year Ended December 31, 2021.(1)

 

 

Demonstrated Coal Reserves (Wet Tons, Washed or Direct Shipped, MMt)(2)

 

Quality (Air-Dried Basis)

 

Proven

 

Probable

 

Total

 

Ash

 

Sulfur

 

Volatile Matter

Australia

 

 

 

 

 

 

 

 

 

 

 

 

Curragh

 

198

 

18

 

215

 

10.7%

 

0.4%

 

19.0%

Total Australia

 

198

 

18

 

215

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

United States

 

 

 

 

 

 

 

 

 

 

 

 

Buchanan

 

87

 

11

 

98

 

6.0%

 

0.7%

 

19.0%

Logan

 

53

 

20

 

74

 

8.0%

 

0.9%

 

35.0%

Mon Valley

 

78

 

57

 

134

 

8.0%

 

1.2%

 

35.0%

Greenbrier

 

4

 

2

 

7

 

8.0%

 

1.0%

 

26.0%

Russell County

 

24

 

5

 

29

 

8.0%

 

0.9%

 

31.0%

Total United States

 

247

 

94

 

341

 

 

 

 

 

 

Total

 

445

 

112

 

556

 

 

 

 

 

 

(1) For more information regarding price assumptions used in the calculation of coal reserves as of December 31, 2021, see the individual property disclosures below.

(2) For more information regarding moisture assumptions used in the calculation of coal reserves as of December 31, 2021, see the individual property disclosures below.

Curragh

Curragh is a production-stage mining property that consists of two active, open-pit, surface mines (Curragh North and Curragh Main). Coal mine development at the Curragh property is presently accomplished by surface mining methods and has been so historically since the mine’s inception. Curragh coals are widely known for their low ash, low to mid volatile matter, low sulfur and low phosphorous content. Curragh Met coal products are also known for their consistent delivered quality, which supports a consistent offtake across a diversified market base. A map of Curragh is shown in Figure 3.

Coronado Global Resources Inc. Form 10-K December 31, 2021 80


Table of Contents

 

Figure 3. Coronado Curragh Mine Complex Property Location Map.

Picture 2

The Curragh mine complex is located within the Bowen Basin coalfields, approximately 200 kilometers by road west of Rockhampton, Queensland, Australia, and approximately 14 kilometers north of the town of Blackwater, Queensland, Australia. The coordinates of CPP1, which is located within Curragh Main, are 688,561 meters East, 7,400,933 meters North in the AMG66 grid system. Curragh owns and operates the necessary CPPs and load-out system for dispatches via Blackwater rail line to the Port of Gladstone or the Stanwell Power Station. See Item 1. “Business—Transportation—Australian Operations” for additional information regarding the rail and port services available to Curragh. Curragh also has maintenance facilities for the fleet of mining equipment, as well as office buildings for the mine staff and personnel. Established sealed roads connect the mine to the town of Emerald, Queensland, Australia, to the west and the Port of Gladstone to the east. Third-party rail providers operate the Blackwater rail line and transport Curragh export coal, for sale to international customers, to the RG Tanna Coal Terminal or Wiggins Island Coal Export Terminal at the Port of Gladstone. Curragh domestic coal is loaded onto train wagons for transportation to the Stanwell Power Station for power generation.

Curragh has ready access to water, electricity and personnel to support its operations. SunWater Ltd. supplies water to the mine complex from the Fairbairn Dam via the Bedford Weir. The mine complex also recycles water from on-site dams—i.e., old open-cut pits that capture rainfall and water from dewatering activities. Curragh has a dedicated 66-kilovolt, or kV, power supply to support the mining operations with a capacity of up to 57-megawatt, or MW, sourced from the main grid power. The substation is located on the southwest corner of ML1878 with both 66kv and 22kv distribution networks to supply the draglines, shovel and CPP.

Coronado Global Resources Inc. Form 10-K December 31, 2021 81


Table of Contents

 

The Mineral Resources Act 1989 (Qld), or MRA, and the Mineral and Energy Resources (Common Provisions) Act 2014 (Qld), or MERCPA, together, provide for the assessment, development and utilization of mineral resources in Queensland to the maximum extent practicable, consistent with sound economic and land use management. The MRA vests ownership of minerals, with limited exceptions, in the “Crown,” which in relation to Curragh, is the Queensland Government. A royalty is payable to the Queensland Government for the right to extract minerals. The MRA also creates different tenures for different mining activities, such as prospecting, exploring and mining. A ML is the most important tenure, as it permits the extraction of minerals in conjunction with other required authorities. The MRA imposes general conditions on an ML.

We control the coal mining rights at Curragh under 14 coal and infrastructure MLs and three MDLs granted pursuant to the MRA. We refer to the MLs and MDLs at Curragh, collectively, as the Tenements. Renewal of certain Tenements will be required during the mine life of Curragh and the Queensland government can vary the terms and conditions on renewal. There are a number of existing mining and petroleum tenements which overlap with the Tenements. The priority, consent and coordination requirements under the MRA, MERCPA and the Petroleum and Gas (Production and Safety) Act 2004 (Qld) (as relevant) may apply with respect to those overlaps. Extensive statutory protocols govern the relationships between co-existing mining and exploration rights and these protocols are largely focused on encouraging the overlapping tenement holders to negotiate and formulate arrangements that enable the co-existence of their respective interests. To date, we have negotiated arrangements in place with all of our overlapping tenement holders and full access to all of our Tenements. See Item 1. “Business—Regulatory Matters—Australia—Tenements” for additional information regarding Curragh mining tenements.

Property control and mining rights at Curragh are entirely expressed in the MLs and MDLs mentioned in Item 1. “Business—Regulatory Matters—Australia—Tenements.” An overlapping petroleum tenure exists over the southern extents of the Tenements. Under the Mineral and Energy Resources (Common Provisions) Act 2014 (Qld), this requires annual information exchanges, including the provision and maintenance of joint information management plans with the overlapping tenement holder. Curragh is compliant with the legislation and there are no current restrictions to coal mining.

As conditions to certain of the Tenements, Curragh is subject to royalties payable to the Queensland government of 7.0% of revenues from coal sales to Stanwell (which could increase as described in Item 1. “Business—Regulatory Matters—Australia—Mineral Resources Act 1989 (Qld)”) and 8.22% to 10.42% of revenues from exported coal. These royalties are in addition to the Stanwell rebate, as described in Item 1. “Business—Customers—Stanwell.” Additionally, if MDL 162 advances from development to production, we would be required to pay under a private royalty deed a base royalty of A$0.50 per Mt of coal and a royalty of A$0.70 for every Mt of SCC produced above 2.5 MMt per year.

A joint venture between Arco Australia Ltd., Australian Consolidated Industries Ltd., R.W. Miller & Co. and Mitsui & Co. (Australia) first began development on certain of the Tenements in 1983. Later, Arco Australia Ltd. bought out the other joint venturers and, in 2000, sold the Property to Wesfarmers Ltd. In 2014, Wesfarmers acquired MDL 162 from Peabody Budjero Pty Ltd. Coronado acquired all the Tenements from Wesfarmers Ltd. in March 2018. Production history has been approximately 12.5 MMt in 2019, 12.0 MMt in 2020 and 11.1 MMt in 2021.

Beginning in the 1960’s, various tenement holders began prospecting and exploratory drilling at Curragh. We currently have an active, ongoing exploration program at Curragh that allows us to update and refine the geological model ahead of pit development.

Coal mine development at the Curragh property is presently accomplished by surface mining methods and has been so historically since the mine’s inception. The mine characteristics and output levels allow it to be ranked as a large coal operation when compared to domestic producers in Australia and worldwide. Curragh operates four large electric draglines, one large electric shovel and a fleet of smaller contractor excavators. Contractors are employed for the pre strip, post strip and coal mining activities. Curragh has two coal preparation plants CPP1 and CPP2. CPP1 is the oldest of the two processing plants and has a documented nameplate capacity of 1100 tph (as received). CPP2 has a documented nameplate capacity of 1200 tph (as received) with a capability of up to 1350 tph when processing selected feed types. Curragh has a loadout facility for loading coal onto railcars, which is connected to the main Blackwater rail link.

Coronado Global Resources Inc. Form 10-K December 31, 2021 82


Table of Contents

 

Generally, the mining equipment and facilities at Curragh are in good operating condition. We focus on the long-term potential of the mine complex and regularly monitor developments in the mining industry for technology improvements and new equipment that could help us increase efficiency and lower our costs. Curragh’s oldest mining equipment, including two draglines, began operations in 1983. All of the draglines have additional boom (stress) monitoring systems, which allow us to increase their total suspended load capacities, and still achieve over 90% mechanical availability. Prior to our taking over mining operations, Wesfarmers Ltd. made improvements to the processing facilities at Curragh, including the commissioning of the second CPP in 2012 and replacing the raw coal crushing system at Curragh Main with an updated circuit in 2016. Wesfarmers Ltd. also started a corrosion and structural repair program over ten years ago that we have continued since acquiring the mine complex. This program helps us ensure that the assets are available well into the future. From time to time, we also update and improve other equipment and facilities to maintain their usefulness and optimize our competitiveness. As of December 31, 2021, the book value of Curragh and its associated plant and equipment was $791.0 million.

We are not aware of any significant encumbrances or defects in title with respect to the Property. We believe we have secured all applicable environmental licenses and permits under both Queensland and Australian Commonwealth legislation and have all permits and licenses regarding cultural heritage, native title and various other social issues. See Item 1. “Business—Regulatory Matters—Australia” for a discussion of the permitting conditions applicable to Curragh.

Summaries of Curragh’s coal resources and reserves as of December 31, 2021 are shown in Tables 4 and 5, respectively.

Table 4. Curragh – Summary of Coal Resources Exclusive of Reserves at the End of the Fiscal Year Ended December 31, 2021.(1)

 

 

Coal Resources

(Wet Tons, In Situ, MMt)(2)(3)(4)

 

Quality (Air-Dried Basis)

 

 

Measured

 

Indicated

 

Measured

+

Indicated

 

Inferred

 

Ash

 

Sulfur

 

Volatile Matter

December 31, 2021

 

328

 

184

 

512

 

142

 

19.5%

 

0.50%

 

18.4%

(1)Curragh splits the resource into areas that are above and below a 15:1 open cut stripping ratio and considers the lower ratio areas as suitable for open cut mining at the higher ratio areas as suitable for underground mining. The average sales price for the underground resources was estimated to be $147 per Mt (FOB). Pricing for resources is described in Section 11.5 of the Curragh TRS.

(2)There are resources suitable for open cut mining outside of reserves. Pricing for resources is described in Section 11.5 of the Curragh TRS. Based on assumed long-term average sales price of $143 per Mt (FOB) representing the long-term average price forecast for Curragh based on independent price forecasts.

(3)Table 1-1 of the Curragh TRS provides a summary of Curragh resource tons inclusive of reserve tons as of December 31, 2021.

(4) Reported on a 5.3% in-situ moisture basis.

 

Table 5. Curragh – Summary of Coal Reserves (Marketable Sales Basis) at the End of the Fiscal Year Ended December 31, 2021.(1)

 

 

Demonstrated Coal Reserves (Wet Tons, Washed or Direct Shipped, MMt)(2)

 

Quality (Air-Dried Basis)

 

Proven

 

Probable

 

Total

 

Ash

 

Sulfur

 

Volatile Matter

December 31, 2021

 

198

 

18

 

215

 

10.7%

 

0.4%

 

19.0%

(1) Based on pricing data as provided by Coronado described in Section 16 of the Curragh TRS. The pricing data assumes average realized price of $141 per Mt sold over the LOM.

(2)Reported on an 11.0% moisture basis.

 

From December 31, 2020 to December 31, 2021, total reserves decreased by approximately 5%, from approximately 226.0 MMt to approximately 215.0 MMt. The decrease in total reserves is attributable to mining depletion.

Coronado Global Resources Inc. Form 10-K December 31, 2021 83


Table of Contents

 

Barry Lay, BSc Geology (Hons); MAusIMM of Resology Pty Ltd, and Paul Wood, B. Eng.; MAusIMM(CP), who is employed full-time as the Senior Life of Mine Planner of our subsidiary, Coronado Curragh, whom we refer to as the Australian QPs, prepared the estimates of coal resources and reserves summarized in Tables 5 and 6. A copy of the Australian QPs’ technical report summary, or TRS, with respect to Curragh, dated February 21, 2022, or the Curragh TRS, is filed as Exhibit 96.1 hereto. Neither Mr. Barry Lay nor Resology Pty Ltd is affiliated with Coronado.

The Australian QPs prepared the estimates of coal resources and reserves using core drilling data available from exploration activities at Curragh conducted by numerous entities over time. Most of this information was obtained prior to our acquisition of the Property, using varying drilling and core-logging techniques, survey methods and testing procedures. As a result, in verifying the data, the Australian QPs made certain assumptions about the adequacy of the processes performed and comparability of the data based on their professional experience and familiarity with Curragh.

Per Section 12.1 of the Curragh TRS, coal reserves were classified as proven or probable considering “modifying factors,” including mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors. Section 22.2 of the Curragh TRS includes a risk assessment of the key modifying factors that could potentially impact the operations and therefore the estimate of coal reserves and resources.

As summarized in Section 7.1 of the Curragh TRS, the concentration of exploration drill holes varies slightly across the Property. The location of the drilling is shown on the maps included in Section 7. Points of observation include exploration drill holes and mine measurements, which have been fully vetted and processed into a geologic model. The geologic model is based on seam depositional modelling, the interrelationship of overlying and underlying strata on seam mineability, seam thickness trends, the impact of seam structure (i.e., faulting), intra-seam characteristics, etc. Section 11.6 of the Curragh TRS summarizes the drill hole spacings and accuracy associated with each resource category.

Coal quality is instrumental in determining the viability of a coal deposit. As per Table 11-1 of the Curragh TRS, coal quality conforms to international standards. These quality attributes aided in converting in-place tons to demonstrated coal reserves (recoverable washed tons). Pricing data as provided by Coronado is described in Table 16-1 of the Curragh TRS. These are weighted-average values across the LOM schedule.

Regarding production rates as described in Section 13 of the Curragh TRS, the mine plan and productivity expectations consider historical performance and efforts have been made to adjust the plan to reflect current technology and future conditions. Mine development and operation have not been optimized within the Curragh TRS. Additional mine-specific factors can be found in Section 13 of the Curragh TRS.

Buchanan

Buchanan is a production-stage mining property, consisting of one active underground mine and supporting infrastructure that produces Low-Vol Met coal using the longwall mining method. The mine complex is located in Buchanan County in southwest Virginia. A map of Buchanan is shown in Figure 4.

Coronado Global Resources Inc. Form 10-K December 31, 2021 84


Table of Contents

 

Figure 4. Coronado Buchanan Mine Complex Property Location Map.

Picture 5

The Buchanan mine complex is located approximately 6.4 kilometers southeast of Oakwood, Virginia, and 16 kilometers southeast of Grundy, Virginia. The coordinates of the Buchanan CPP are latitude 37° 09' 40" and longitude 81° 59' 13" (Easting 984,100’, Northing 320,100’ – in the VA State Plane South NAD 27 grid system). The nearest major population centers are Roanoke, Virginia, and Lexington, Kentucky, which are about 153 kilometers northeast and 290 kilometers northwest of the property, respectively. From U.S. Route 460, which runs through Oakwood, a well-developed network of improved and unimproved roads provides access to the property. The surface facilities at Buchanan are located along a Norfolk Southern rail line, which serves as the primary means of transport for produced coal. Norfolk Southern transports coal from the Buchanan mine complex either to domestic customers or to Lamberts Point Coal Terminal Pier 6 in Norfolk, Virginia, for overseas shipment.

Buchanan has ready access to water, electricity and personnel to support its operations. The mine complex sources water from streams that flow over Company-owned property. The mine also utilizes ground water from an old abandoned mine. Electricity is sourced from American Electric Power. Personnel have historically been sourced from the surrounding communities in Buchanan, Tazewell, McDowell and Pike Counties and have proven to be adequate in numbers to operate the mine complex. As mining is common in the surrounding areas, the workforce is generally familiar with mining practices and many are experienced miners.

The property mineral rights are composed of approximately 34,089 total hectares, of which 26,243 are leased or subleased from private landholders under approximately 150 individual coal lease tracts, and 7,846 hectares are owned by Coronado. Subject to Coronado’s exercising its renewal rights thereunder, all the leases expire upon exhaustion of the relevant coal reserves, which is expected to occur in 2047.

Under the terms of the relevant leases, we are required to pay royalties ranging from 3.5% to 6.0% of the selling price of coal mined from the corresponding leasehold and, for the majority, an annual minimum royalty, irrespective of production. Coal produced at Buchanan, however, is not subject to “wheelage fees” (i.e., fees payable on coal mined and removed from properties other than the particular leasehold and hauled across the leasehold premises).

The property was formerly controlled by Consolidation Coal Company, or CONSOL. Mine development was started by CONSOL in 1983 and longwall production began in 1987. Coronado acquired the Buchanan Mine from CONSOL in March 2016. Production history has been approximately 4.5 MMt in 2019, 3.4 MMt in 2020 and 4.4 MMt in 2021.

Coronado Global Resources Inc. Form 10-K December 31, 2021 85


Table of Contents

 

Our right to commercially mine and recover coal reserves at Buchanan overlaps with the right of an affiliate of CNX Resources Corporation, which we refer to as the Gas Party, to commercially recover and develop coal gas interests from the mine area. The Gas Party and we have entered into certain agreements to regulate the interaction between, and coordinate, our respective operations. In general, the combination of these overlapping interests allows for mutual benefits to the parties, namely, the degassing of our coal mining operations in the mine, which helps assure the safety of mine personnel, and the Gas Party’s commercial capture and sale of the coal gas. In addition, the Gas Party’s drilling activities have contributed to exploration efforts with respect to coal deposits at Buchanan. As the only natural gas supplier in the area, we purchase our requirements of natural gas for the operation of our thermal dryer at Buchanan from the Gas Party.

Before Coronado took over mining operations at Buchanan, CONSOL Energy had conducted extensive exploration of the property. We have continued exploration at the property through a program of core drilling to confirm reserves, establish additional resources and assess the geotechnical viability of mining.

Buchanan produces primarily a Low-Vol HCC, but it also produces a premium Low-Vol PCI product. The Buchanan mine extracts coal from the Pocahontas #3 seam of the Pennsylvanian-age Pocahontas Formation, which is the principal minable coal seam of that formation. The seam is situated below drainage throughout the Property and is accessed by vertical shafts. The seam thickness averages 1.86 meters within the mining area.

The Buchanan mine extracts coal using a single longwall system supported by six continuous miner sections, which develop main entries and gate roads in preparation for the longwall. Each continuous miner section is equipped with one or two continuous miners, two roof bolters and two or three coal haulage units. After extraction, a series of conveyor belts deliver raw coal to an underground storage bunker. The Buchanan mine complex uses a skip hoist system to lift raw coal to the surface. Buchanan has a CPP that processes raw coal at a rate of approximately 1,270 raw tph, as well as the other necessary support infrastructure, including loadout and portal facilities.

Generally, the mining equipment and facilities at Buchanan are in good operating condition. We focus on the long-term potential of the mine complex and regularly monitor developments in the mining industry for technology improvements and new equipment that could help us increase efficiency and lower our costs. Since acquiring the Buchanan operations, we have implemented improvements at the CPP, which have resulted in increased capacity. From time to time, we also update and improve other equipment and facilities to maintain their usefulness and optimize our competitiveness. For example, we rebuild our longwall shear, drives and cycling shields after every panel. We have also entered into life cycle management agreements for our continuous miner equipment, installed programmable logic controller, or PLC, controls on the skip hoist system, upgraded our belt drives for increased horsepower, deployed state-of-the-art Fletcher roof bolters on our continuous miner sections and switched to PLC control systems and variable frequency drive, or VFD, starters on our belt drives. As of December 31, 2021, the book value of Buchanan and its associated plant and equipment was $367.0 million.

We are not aware of any significant encumbrances or defects in title with respect to the Property. Additionally, we believe we have obtained all requisite mining and discharge permits to conduct our operations at Buchanan and expect to be able to obtain all required permits in the future. The Buchanan mine complex holds one state permit, with the associated NPDES permit.

Buchanan is subject to a federal black lung excise tax of $1.21 per ton for underground mining and a federal reclamation tax of $0.13 per ton for underground mining. However, the federal black lung excise tax applies only with respect to coal sold domestically. Additionally, Buchanan is subject to a Virginia reclamation tax of $0.05 per ton (which amount is contributed to a state-funded bond pool) and a Virginia severance tax of 2% for all coal sold. See Item 1. “Business—Regulatory Matters—United States” for a discussion of the permitting conditions applicable to Buchanan.

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 86


Table of Contents

 

Summaries of Buchanan’s coal resources and reserves as of December 31, 2021 are shown in Tables 6 and 7, respectively.

Table 6. Buchanan – Summary of Coal Resources Exclusive of Reserves at the End of the Fiscal Year Ended December 31, 2021.(1)

 

 

 

Coal Resources (Dry Tons, In Situ, MMt)(2)(3)

 

Quality (Air-Dried Basis)

 

 

Measured

 

Indicated

 

Measured

+

Indicated

 

Inferred

 

Ash

 

Sulfur

 

Volatile Matter

December 31, 2021

 

11

 

4

 

15

 

—

 

25.0%

 

0.7%

 

16.0%

(1)Pricing for resources is described in Section 11.3.1 of the Buchanan TRS. Based on assumed long-term average price of $94 per Mt (FOB loadout) representing the long-term average price forecast for Buchanan based on independent price forecasts.

(2) Exclusive of reserve tons. Table 1-1 of the Buchanan TRS provides a summary of Buchanan resource tons inclusive of reserve tons as of December 31, 2021.

(3)Reported on a dry basis. Surface moisture and inherent moisture are excluded.

 

Table 7. Buchanan – Summary of Coal Reserves (Marketable Sales Basis) at the End of the Fiscal Year Ended December 31, 2021.(1)

 

 

Demonstrated Coal Reserves (Wet Tons, Washed or Direct Shipped, MMt)(2)

 

Quality (Air-Dried Basis)

 

Proven

 

Probable

 

Total

 

Ash

 

Sulfur

 

Volatile Matter

December 31, 2021

 

87

 

11

 

98

 

6.0%

 

0.7%

 

19.0%

(1)Pricing data as provided by Coronado is described in Section 16.2 of the Buchanan TRS. The pricing data assumes a weighted average domestic and international FOB-mine price of approximately $197 per Mt for calendar year 2022. The weighted average price decreases to approximately $118 to $126 per Mt through year 2026 and averages approximately $152 per Mt over the LOM.

(2)Reported on a 6.0% moisture basis.

From December 31, 2020 to December 31, 2021, total reserves decreased by approximately 3%, from approximately 100.8 MMt to approximately 98.0 MMt. This net reduction of 2.8 MMt of total reserves was attributable to a combination of updates to the mine plan along with one year of mining depletion.

Michael G. McClure, CPG, and Justin S. Douthat, PE, MBA, of Marshall Miller & Associates, Inc., whom we refer to as the U.S. QPs, prepared the estimates of coal resources and reserves as of December 31, 2021 summarized in Tables 7 and 8. Both are full-time employees of Marshall Miller & Associates, Inc. and recognized as QPs. A copy of the U.S. QPs’ TRS with respect to Buchanan, dated as of February 18, 2022, or the Buchanan TRS, is filed as Exhibit 96.2 hereto. The U.S. QPs are not affiliated with Coronado.

The U.S. QPs prepared the estimates of coal resources and reserves using core drilling data available from exploration activities at Buchanan conducted by numerous entities over time. Most of this information was obtained prior to our acquisition of the property, using varying drilling and core-logging techniques, survey methods and testing procedures. As a result, in verifying the data, the U.S. QPs made certain assumptions about the adequacy of the processes performed and comparability of the data based on their professional experience and familiarity with Buchanan.

Per Section 12.1 of the Buchanan TRS, coal reserves were classified as proven or probable considering “modifying factors,” including mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors. Section 22.2 of the Buchanan TRS includes a risk assessment of the key modifying factors that could potentially impact the operations and therefore the estimate of coal reserves and resources.

Coronado Global Resources Inc. Form 10-K December 31, 2021 87


Table of Contents

 

As summarized in Section 7.1 in the Buchanan TRS, the U.S. QPs utilized 4,535 available core, rotary, and coalbed methane wells on and around the Buchanan property. Points of observation include exploration drill holes, degas holes, and mine measurements, which have been fully vetted and processed into a geologic model. The geologic model is based on seam depositional modeling, the interrelationship of overlying and underlying strata on seam mineability, seam thickness trends, the impact of seam structure (i.e., faulting), intra-seam characteristics, etc. The U.S. QPs completed a geostatistical analysis on drill holes within the reserve boundaries to determine the applicability of the common United States classification system for measured and indicated coal resources. Historically, the United States has assumed that coal within 0.4 kilometers of a point of observation represents a measured resource, whereas coal between 0.4 kilometers and 1.2 kilometers from a point of observation is classified as indicated. Inferred resources are commonly assumed to be located between 1.2 kilometers and 4.8 kilometers from a point of observation. The U.S. QPs performed a geostatistical analysis of the Buchanan data set using the Drill Hole Spacing Analysis, or DHSA, method. DHSA prescribes that measured, indicated and inferred drill hole spacings be determined at the 10%, 20%, and 50% levels of relative error, respectively. Comparing the results of the DHSA to the historical standards, it is evident that the historical standards are more conservative than even the most conservative DHSA model with regards to determining measured resources. The Exponential model included in the DHSA recommends using a radius of 0.67 kilometers for measured resources compared to the historical value of 0.4 kilometers. With respect to indicated resources the DHSA falls in line closely with the historical standards. The Exponential and Spherical models of the DHSA recommend using a radius of 1.08 kilometers from a point of observation for indicated resources, while the Gaussian model included in the DHSA recommends a radius of 1.10 kilometers from a point of observation for indicated resources. These values line up closely with the historical radius of 1.2 kilometers. These results have led the U.S. QPs to report the data following the historical classification standards, rather than use the results of the DHSA.

Coal quality is instrumental in determining the viability of a coal deposit. Per Section 8.2 of the Buchanan TRS, coal quality conforms to the American Society for Testing and Materials, or ASTM, standards. These quality attributes aided in converting dry, in-place tons to demonstrated coal reserves (recoverable washed tons). The reserve and resource criteria are presented in Table 11-1 of the Buchanan TRS, including assumptions related to seam density, minimum cut-off thickness, and recoveries.

Regarding production rates as described in Section 13.2 of the Buchanan TRS, the mine plan and productivity expectations reflect historical performance and efforts have been made to adjust the plan to reflect future conditions. Mine development and operation have not been optimized within the Buchanan TRS.

Logan

Coronado’s Logan property is currently in the production stage. Logan consists of four active underground mines (Powellton No. 1, Lower War Eagle, Eagle No. 1 and Muddy Bridge) and supporting infrastructure that produce High-Volatile Met coal using the room and pillar mining method and one active surface mine (Toney Fork) and supporting infrastructure that produce both Met and thermal coal using the contour and highwall mining methods. The Logan complex life plan includes 12 proposed mines, consisting of nine underground mines and three surface mines. The property is located in Boone, Logan and Wyoming Counties in southern West Virginia. The surface facilities are located in Logan County, West Virginia. A map of Logan is shown in Figure 5.

Coronado Global Resources Inc. Form 10-K December 31, 2021 88


Table of Contents

 

Figure 5. Coronado Logan Mine Complex Property Location Map.

Picture 1573304224

 

The Logan mine complex encompasses the towns of Lorado and Pardee in Logan County, West Virginia, and Cyclone and Lacoma in Wyoming County, West Virginia. The coordinates of the Saunders CPP are latitude 37° 47' 58" and longitude 81° 40' 01" (Easting 1,806,880’, Northing 291,517’ – in the WV State Plane South NAD 27 grid system). The nearest major population centers are Huntington, West Virginia, and Charleston, West Virginia, which are about 145 kilometers northwest and 129 kilometers northeast of the property, respectively. From U.S. Route 119, which runs through Mingo, Logan and Boone Counties to the north, a well-developed network of improved and unimproved roads provides access to the property, including Route 16 and Route 10, which run east-west across the property in Logan County and Wyoming County, respectively. The Logan surface facilities are located approximately 21 kilometers northeast of Man, West Virginia, along a CSX Corporation, or CSX, rail line, which serves as the primary means of transport for produced coal. CSX transports coal from Logan either to domestic customers or to the Kinder Morgan Pier IX and Dominion Terminals in Norfolk, Virginia, for overseas shipment.

Logan has ready access to water, electricity and personnel to support its operations. Buffalo Creek Public Service District supplies water and American Electric Power supplies electricity to the mine complex. Mine personnel generally live in the surrounding communities of Logan, Boone, Wyoming and Mingo Counties in West Virginia.

The property mineral rights are composed of 13,138 total hectares, 13,069 of which are leased from private landholders under approximately 15 individual leases, and 69 hectares are owned by Coronado. Subject to Coronado exercising its renewal rights thereunder, a majority of the leases, covering a majority of the Logan reserves, expire upon exhaustion of the relevant coal reserves, which is expected to occur in 2053. One lease expires in 2032; however, Coronado is projected to have previously exhausted the reserves covered thereby.

Under the terms of the leases, we are required to pay royalties ranging from 3.0% to 9.0% of revenue from sales of coal produced depending on mining method. Certain of the leases also provide for “wheelage fees” ranging from 0.25% to 1.0% of revenue from sales of coal mined and removed from properties other than the particular leasehold and hauled across the leasehold premises.

The mining of Logan was commenced in 1945 by Lorado Mining Company, or Lorado. Lorado was sold to Buffalo Mining Company in 1964 and then to Pittston Coal Company in 1971. Pittston operated the property until the early 1990’s. After being idle for a period, the property was then sold to Addington Resources in 2004. Imagin Natural Resources acquired the property in 2007 and sold it to Cliffs Natural Resources Inc. (now known as Cleveland-Cliffs Inc.) in 2011, which in turn sold the property to Coronado in 2014. Production history has been approximately 2.7 MMt in 2019, 1.6 MMt in 2020 and 1.9 MMt in 2021.

Coronado Global Resources Inc. Form 10-K December 31, 2021 89


Table of Contents

 

Before Coronado acquired Logan, previous owners had conducted extensive exploration on the property. Coronado has continued exploration at the property through a program of core drilling to confirm reserves, establish additional resources and assess the geotechnical viability of mining.

Logan produces primarily High-Vol Met coal (HVA HCC and HVB HCC), mined from various seams of the Kanawha Formation, most of which are situated below drainage; however, several Met coal seams are situated above drainage. Logan also produces thermal coal from upper portions of the Kanawha Formation.

Most of Logan’s Met coal production is attributable to its four active underground mines, Powellton No. 1, Lower War Eagle, Eagle No. 1 and Muddy Bridge, each of which uses the room and pillar mining method. The Powellton No. 1 mine utilizes one continuous miner super section to extract coal from the Upper Powellton seam, which is situated above or below drainage, depending on the relief of the property, and accessed by a shallow slope and crop. The Lower War Eagle mine utilizes two continuous miner super sections to extract coal from the Lower War Eagle seam, which is situated below drainage throughout the property and accessed by slope. The Eagle No. 1 mine utilizes three continuous miner super sections to extract coal from the No. 2 Gas seam, which is situated above drainage throughout the property and accessed by drift entry. The Muddy Bridge mine utilizes two continuous miner super sections to extract coal from the No. 2 Gas seam, which is situated above drainage throughout the property and accessed by drift entry.

A majority of the sections of the active underground mines at Logan are configured as full super sections, with two continuous miners per section. Each section also has two or four roof bolters, three or six shuttle cars and two scoops. From the continuous miner at the production face, the shuttle cars haul extracted coal to a feeder breaker, which transfers raw coal to a conveyor belt for transport to a surface stockpile holding area. A shared overland conveyor carries raw coal from the Powellton No. 1 and Lower War Eagle mines to a CPP. Trucks haul raw coal from the Eagle No. 1 mine to the CPP and from the Muddy Bridge mine to the Logan overland conveyor. The CPP has a feed rate capacity of 1,088 raw tph. The CPP site includes raw coal storage, clean coal storage, a loadout connected to a CSX rail line and refuse disposal area.

The Toney Fork surface mine extracts Met and thermal coal using the area mining method. The current LOM plan for Toney Fork also contemplates utilizing contour and highwall mining methods at various times during the life of the mine. The mine uses a spread of front-end loaders, large tractors/dozers and rock trucks to remove overburden and expose the coal. We will deploy highwall mining when overburden volumes exceed economical stripping ratios associated with area and contour mining. Trucks haul raw coal from Toney Fork to the CPP site for cleaning or to the loading site to be shipped directly to customers.

Our current plans at Logan contemplate 12 proposed mines, consisting of nine underground mines and three surface mines, including the five mines currently in operation. The proposed underground mines would extract coal using the room and pillar mining method, and the proposed surface mines would extract coal using area, contour or highwall mining methods, or some combination thereof.

Generally, the mining equipment and facilities at Logan are in good operating condition. We focus on the long-term potential of the mine complex and regularly monitor developments in the mining industry for technology improvements and new equipment that could help us increase efficiency and lower our costs. Logan’s oldest mining equipment and facilities, including the CPP and loadout facility, began operations in 2008, when the Powellton No. 1 mine started production. Since acquiring the Logan operations, we have implemented improvements at the CPP, which have resulted in increased capacity. From time to time, we also update and improve other equipment and facilities to maintain their usefulness and optimize our competitiveness. As of December 31, 2021, the book value of Logan and its associated plant and equipment was $226.2 million.

We are not aware of any significant encumbrances or defects in title with respect to the property. Additionally, we believe we have obtained all requisite mining and discharge permits to conduct our operations at Logan and expect to be able to obtain or renew all required permits in the future. The Logan mine complex holds 25 state permits with associated NPDES permits.

Logan is subject to a federal black lung excise tax of $1.21 per ton for underground mining and $0.28 per ton for surface and highwall mining; however, this tax applies only with respect to coal sold domestically. Logan is also subject to a federal reclamation fee of $0.13 per ton for underground mining and $0.31 per ton for surface and highwall mining. Additionally, Logan is subject to a West Virginia reclamation tax of $0.308 per ton and a West Virginia severance tax of 1.0% to 5.0% of revenues for all coal produced. See Item 1. “Business—Regulatory Matters—United States” for a discussion of the permitting conditions applicable to Logan.

Summaries of Logan’s coal resources and reserves as of December 31, 2021 are shown in Tables 8 and 9, respectively.

Coronado Global Resources Inc. Form 10-K December 31, 2021 90


Table of Contents

 

Table 8. Logan – Summary of Coal Resources Exclusive of Reserves at the End of the Fiscal Year Ended December 31, 2021.(1)

 

 

Coal Resources (Dry Tons, In Situ, MMt)(2)(3)

 

Quality (Air-Dried Basis)

 

 

Measured

 

Indicated

 

Measured

+

Indicated

 

Inferred

 

Ash

 

Sulfur

 

Volatile Matter

December 31, 2021

 

46

 

37

 

83

 

3

 

24.0%

 

1.0%

 

28.0%

(1)Pricing for resources is described in Section 11.3.1 of the Logan TRS. Based on assumed long-term average price of $130 per ton (FOB loadout) for underground-mineable resources, representing the long-term average price forecast for HVB provided by Coronado. Surface resources were assessed at a sales price of $52 per Mt (FOB loadout) based on estimated historical pricing for Coronado’s surface operations.

(2)Exclusive of reserve tons. Table 1-1 of the Logan TRS provides a summary of Logan resource tons inclusive of reserve tons as of December 31, 2021.

(3)Reported on a dry basis. Surface moisture and inherent moisture are excluded.

Table 9. Logan – Summary of Coal Reserves (Marketable Sales Basis) at the End of the Fiscal Year Ended December 31, 2021.(1)

 

 

Demonstrated Coal Reserves (Wet Tons, Washed or Direct Shipped, MMt)(2)

 

Quality (Air-Dried Basis)

 

Proven

 

Probable

 

Total

 

Ash

 

Sulfur

 

Volatile Matter

December 31, 2021

 

53

 

20

 

74

 

8.0%

 

0.9%

 

35.0%

(1)Pricing data as provided by Coronado is described in Section 16.2 of the Logan TRS. The pricing data assumes respective HVA, HVB, specialty markets and thermal FOB-mine prices of approximately $224, $123, and $51 per Mt for calendar year 2022. HVA, HVB, and thermal prices decrease to approximately $145, $115, and $51 per Mt, respectively, through year 2026, and then increase to $227, $189, and $51 per Mt, respectively, through year 2050 (after which sales prices were held constant).

(2) Reported on a 4.5% - 6.0% moisture basis.

From December 31, 2020 to December 31, 2021, total reserves decreased by approximately 2.0%, from approximately 75.0 MMt to 73.5 MMt. This net reduction of 1.5 MMt of total reserves was attributable to a combination of updates to the mine plans along with one year of mining depletion.

John W. Eckman, CPG, and Justin S. Douthat, PE, MBA, of Marshall Miller & Associates, Inc., whom we refer to as the U.S. QPs, prepared the estimates of coal resources and reserves as of December 31, 2021 summarized in Tables 9 and 10. Both are full-time employees of Marshall Miller & Associates, Inc. and recognized as QPs. A copy of the U.S. QPs’ TRS with respect to Logan, dated as of February 18, 2022, or the Logan TRS, is filed as Exhibit 96.3 hereto. The U.S. QPs are not affiliated with Coronado.

The U.S. QPs prepared the estimates of coal resources and reserves using core drilling data available from exploration activities at Logan conducted by numerous entities over time. Most of this information was obtained prior to our acquisition of the property, using varying drilling and core-logging techniques, survey methods and testing procedures. As a result, in verifying the data, the U.S. QPs made certain assumptions about the adequacy of the processes performed and comparability of the data based on their professional experience and familiarity with Logan. Per Section 12.1 of the Logan TRS, coal reserves were classified as proven or probable considering “modifying factors,” including mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors. Section 22.2 of the Logan TRS includes a risk assessment of the key modifying factors that could potentially impact the operations and therefore the estimate of coal reserves and resources.

Coronado Global Resources Inc. Form 10-K December 31, 2021 91


Table of Contents

 

As summarized in Section 7.1 in the Logan TRS, the U.S. QPs utilized 1,127 available core, rotary, and gas well drilling on and around the Logan property. Points of observation include exploration drill holes, degas holes, and mine measurements, which have been fully vetted and processed into a geologic model. The geologic model is based on seam depositional modeling, the interrelationship of overlying and underlying strata on seam mineability, seam thickness trends, the impact of seam structure (i.e., faulting), intra-seam characteristics, etc. The U.S. QPs completed a geostatistical analysis on drill holes within the reserve boundaries to determine the applicability of the common United States classification system for measured and indicated coal resources. Historically, the United States has assumed that coal within 0.4 kilometers of a point of observation represents a measured resource whereas coal between 0.4 kilometers and 1.2 kilometers from a point of observation is classified as indicated. Inferred resources are commonly assumed to be located between 1.2 kilometers and 4.8 kilometers from a point of observation. The U.S. QPs performed a geostatistical analysis of the Logan data set using the DHSA method. DHSA prescribes measured, indicated, and inferred drill hole spacings be determined at the 10%, 20%, and 50% levels of relative error, respectively. Comparing the results of the DHSA to the historical standards, it is evident that the historical standards are more conservative than even the most conservative DHSA model with regards to determining measured resources. The Exponential and Spherical models recommend using a radius of 0.87 kilometers for measured resources compared to the historical value of 0.4 kilometers. With respect to indicated resources the Spherical and Exponential models recommend using a radius 1.53 kilometers. The historical radius of 1.2 kilometers is therefore also more conservative than the DHSA results for indicated resources. These results have led the U.S. QPs to report the data following the historical classification standards, rather than use the results of the DHSA.

Coal quality is instrumental in determining the viability of a coal deposit. Per Section 8.2 of the Logan TRS, coal quality conforms to the ASTM standards. These quality attributes aided in converting dry, in-place tons to demonstrated coal reserves (recoverable washed tons). The reserve and resource criteria are presented in Table 11-1 of the Logan TRS, including assumptions related to seam density, minimum cutoff thickness, and recoveries. Pricing data as provided by Coronado is described in Section 16.2 of the Logan TRS.

Regarding production rates as described in Section 13.2 of the Logan TRS, the projected underground mines are set up similarly to the four active underground operations as of December 31, 2021. Each mine is scheduled to operate one to three production sections. All sections are configured as full super sections with two continuous miners per section. Three surface resource areas were modeled. Mining operations are projected to utilize area, as well as contour, mining methods. The three areas planned for highwall mining are assumed to be mined by a contractor; therefore, the contractor costs included in the financial model assume that the contractor is responsible for staffing those operations along with providing necessary equipment capital. Spoil for final highwall reclamation is expected to come from strategic placement of spoil on pre-existing benches by haul trucks such that they are within the push distance of the reclamation dozer. Additional information regarding mine-specific production factors can be found in Section 13.4 of the Logan TRS.

Mon Valley

The Mon Valley mine complex comprises three development-stage mining properties, namely, Pangburn, Shaner and Fallowfield, each consisting of a proposed underground mine that would produce High-Vol Met coal using the room and pillar mining method. The preliminary design for the properties also includes plans for surface facilities and a preparation plant for each mine. The properties reside in Allegheny, Washington and Westmoreland Counties in southwestern Pennsylvania. The proposed facilities include a barge loading dock and CSX rail loadout on the Monongahela River in Allegheny County, Pennsylvania, which would ship clean coal from all three mines to end customers. A map of Mon Valley is shown in Figure 6.

Coronado Global Resources Inc. Form 10-K December 31, 2021 92


Table of Contents

 

Figure 6. Coronado Mon Valley Mine Complex Property Location Map.

Picture 1785281222

Mon Valley is located approximately 22.5 kilometers southeast of Pittsburgh, Pennsylvania, near the communities of Bentleyville, Lockview, Monongahela, Elizabeth, Sutersville and Irwin, Pennsylvania. The coordinates of the proposed infrastructure are latitude 40° 15' 24" and longitude 79° 53' 50" (Easting 1,398,821’, Northing 343,480’ – in the PA State Plane South NAD 27 grid system). From U.S. Interstate 70 and Pennsylvania Route 51, which traverse the Fallowfield and Pangburn areas, respectively, a well-developed network of improved and unimproved roads allows general access to the property. The Monongahela and Youghiogheny Rivers also run through the property. The primary means of transport for produced coal would be by barge on the Monongahela River/Ohio River system. Additionally, a CSX rail line located along the banks of the Monongahela River would provide another option for the shipment of coal.

Mon Valley has sources of water, power, and supplies readily available for use. Personnel in the area have historically been sourced from the surrounding communities in Allegheny, Washington, and Westmoreland Counties, and have proven to be adequate in numbers to operate the mines. As mining is common in the surrounding areas, the workforce is generally familiar with mining practices, and many are experienced miners. Water is expected to be sourced locally from a nearby public water sources or rivers. Electricity is anticipated to be sourced from West Penn Power. The service industry in the areas surrounding the proposed mine complex has historically provided supplies, equipment repairs and fabrication, etc.

The property mineral rights are composed of 41,615 total hectares, of which 1,339 are leased from private landholders under two leases, and 40,276 hectares are owned by Coronado. Subject to Coronado’s exercising its renewal rights thereunder, both of the leases expire upon exhaustion of the relevant coal reserves, which is expected to occur in 2099.

A predecessor of CONSOL Energy previously controlled the properties. We acquired the properties from CONSOL Energy in March 2016 in connection with the acquisition of the Buchanan property.

Before we acquired Mon Valley, CONSOL Energy had conducted extensive exploration of Mon Valley. We have continued an exploration program focused on defining reserves and assessing the geotechnical viability of mining.

Mon Valley is capable of producing primarily a High-Vol Met coal from the Upper Freeport seam of the Pennsylvania-age Allegheny Formation. The seam is situated below drainage throughout the properties and would be accessed with slopes and shafts. The seam thickness in the projected mining areas averages 1.95 meters.

Coronado Global Resources Inc. Form 10-K December 31, 2021 93


Table of Contents

 

Under our current mine development plans, production would begin at the Pangburn mine in 2031, followed by the Shaner mine in 2037 and, finally, the Fallowfield mine in 2056. The proposed Mon Valley underground mines would use the room and pillar mining method with limited pillaring as to cause no subsidence. Each mine would have three continuous miner sections, with two continuous miners, two roof bolters, four shuttle cars and two scoops per section. The shuttle cars would haul extracted coal from the production face to a feeder breaker-conveyor system, which would carry raw coal to a surface stockpile and CPP. The CPPs and surface facilities would have large raw and clean coal storage areas to facilitate efficient loading of clean coal into barges or rail cars for transport. We have not yet completed detailed designs of the infrastructure or surface facilities for the proposed Shaner and Fallowfield mines.

As of December 31, 2021, the book value of Mon Valley was $17.4 million.

We are not aware of any significant encumbrances or defects in title with respect to the properties. However, we will be required to obtain alternate zoning approval from the local township. Further, we will be required to submit formal permit applications to state or federal regulatory agencies. Although we have commenced the work to obtain the necessary permits and zoning variances, we are aware that the period of time necessary to obtain final authorizations, for purposes of commencing the development, construction and ultimate production at the proposed mine site, may be significant, and there can be no assurance that we can obtain the necessary zoning and permits. See Item 1. “Business—Regulatory Matters—United States” for a discussion of the permitting conditions applicable to Mon Valley.

Coal mined from the Mon Valley mine complex would be subject to a federal black lung excise tax of $1.21 per ton for underground mining and a federal reclamation tax of $0.13 per ton for underground mining. However, the federal black lung excise tax will only apply with respect to coal sold domestically.

Mon Valley contains no resources exclusive of reserve tons as of December 31, 2021. Table 1-1 of the Mon Valley TRS provides a summary of Mon Valley resource tons inclusive of reserve tons as of December 31, 2021.

A summary of Mon Valley’s coal reserves as of December 31, 2021 is shown in Table 10.

Table 10. Mon Valley – Summary of Coal Reserves (Marketable Sales Basis) at the End of the Fiscal Year Ended December 31, 2021.(1)

 

 

Demonstrated Coal Reserves (Wet Tons, Washed or Direct Shipped, MMt)(2)

 

Quality (Air-Dried Basis)

 

Proven

 

Probable

 

Total

 

Ash

 

Sulfur

 

Volatile Matter

December 31, 2021

 

78

 

57

 

134

 

8.0%

 

1.2%

 

35.0%

(1)Pricing data as provided by Coronado is described in Section 16.2 of the Mon Valley TRS. The pricing data assumes HVB domestic and export FOB-mine prices of approximately $137 and $120 per Mt, respectively, for calendar year 2027. HVB domestic and export prices increase to approximately $221 and $193 per Mt, respectively, through year 2050, and then increased by 1% annual inflation thereafter.

(2) Reported on a 6.0% moisture basis.

Total reserves did not change from December 31, 2020 to December 31, 2021.

Scott Peterson, CPG, and Justin S. Douthat, PE, MBA, of Marshall Miller & Associates, Inc., whom we refer to as the U.S. QPs, prepared the estimates of coal resources and reserves summarized in Tables 13 and 14. Both are full-time employees of Marshall Miller & Associates, Inc. and recognized as QPs. A copy of the U.S. QPs’ TRS with respect to Mon Valley (Pennsylvania Upper Freeport Holdings), dated as of February 18, 2022, or the Mon Valley TRS, is filed as Exhibit 96.4 hereto. The U.S. QPs are not affiliated with Coronado.

The U.S. QPs prepared the estimates of coal resources and reserves using core drilling data available from exploration activities at Mon Valley conducted by numerous entities over time. Most of this information was obtained prior to our acquisition of the Property, using varying drilling and core-logging techniques, survey methods and testing procedures. As a result, in verifying the data, the U.S. QPs made certain assumptions about the adequacy of the processes performed and comparability of the data based on their professional experience and familiarity with Mon Valley.

Per Section 12.1 of the Mon Valley TRS, coal reserves were classified as proven or probable considering “modifying factors,” including mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors. Section 22.2 of the Mon Valley TRS includes a risk assessment of the key modifying factors that could potentially impact the operations and therefore the estimate of coal reserves and resources.

Coronado Global Resources Inc. Form 10-K December 31, 2021 94


Table of Contents

 

As summarized in Section 7.1 in the Mon Valley TRS, the U.S. QPs utilized approximately 750 available core and rotary holes on and around the Mon Valley properties. Points of observation include exploration drill holes, degas holes, and mine measurements, which have been fully vetted and processed into a geologic model. The geologic model is based on seam depositional modeling, the interrelationship of overlying and underlying strata on seam mineability, seam thickness trends, the impact of seam structure (i.e. faulting), intra-seam characteristics, etc. The U.S. QPs completed a geostatistical analysis on drill holes within the reserve boundaries to determine the applicability of the common United States classification system for measured and indicated coal resources. Historically, the United States has assumed that coal within 0.4 kilometers of a point of observation represents a measured resource whereas coal between 0.4 kilometer and 1.2 kilometers from a point of observation is classified as indicated. Inferred resources are commonly assumed to be located between 1.2 kilometers and 4.8 kilometers from a point of observation. The U.S. QPs performed a geostatistical analysis of the Pennsylvania data set using the DHSA method. DHSA prescribes measured, indicated, and inferred drill hole spacings be determined at the 10-percent, 20-percent, and 50-percent levels of relative error, respectively. Comparing the results of the DHSA to the historical standards, it is evident that the historical standards are more conservative than even the most conservative DHSA model with regards to determining measured resources. The Gaussian and Spherical models recommend using a radius of 0.72 kilometers for measured resources compared to the historical value of 0.4 kilometers. With respect to indicated resources the DHSA falls in line closely with the historical standards. The Exponential model recommends using a radius 1.43 kilometers, while the Spherical and Gaussian models recommend a radius of 1.42 kilometers, respectively. These values line up closely with the historical radius of 1.2 kilometers. These results have led the U.S. QPs to report the data following the historical classification standards, rather than use the results of the DHSA.

Coal quality is instrumental in determining the viability of a coal deposit. Per Section 8.2 of the Mon Valley TRS, coal quality conforms to the ASTM standards. These quality attributes aided in converting dry, in-place tons to demonstrated coal reserves (recoverable washed tons). The reserve and resource criteria are presented in Table 11-1 of the Mon Valley TRS, including assumptions related to seam density, minimum cutoff thickness, and recoveries. Pricing data as provided by Coronado is described in Section 16.2 of the Mon Valley TRS.

Regarding production rates as described in Section 13.2 of the Mon Valley TRS, the Mon Valley mine complex is not yet active, with three distinct mines and CPPs planned. The mine plan and productivity expectations reflect historical performance from other similar mines with similar conditions and efforts have been made to adjust the plan to reflect future conditions. Mine development and operation have not been optimized within the Mon Valley TRS. Additional mine-specific factors can be found in Section 13.4 of the Mon Valley TRS.

Greenbrier (Non-Material Property)

The Greenbrier property has been idled since April 1, 2020. During the fourth quarter of 2020, the Company committed to a plan to sell Greenbrier on the basis that it does not form part of the Company’s core business strategy. The Greenbrier property is not considered material to Coronado’s business or financial conditions. Resources exclusive of reserves are based on assumed long-term average price of $122 per ton (FOB loadout) for underground-mineable resources and between $116 to $120 per Mt (FOB loadout) for surface/highwall mining resources, representing the Company’s long-term average price forecast for Greenbrier. The pricing data assumes respective Mid-Vol, Low-Vol and thermal/PCI FOB-mine prices of approximately $147, $137 and $76 per Mt for calendar year 2027. Mid-Vol, Low-Vol and thermal/PCI prices increase to approximately $196, $181 and $102 per Mt, respectively, through year 2040. The Greenbrier operations are projected to be fully depleted in 2042. Marketable reserve tons are reported on a moist basis, including a combination of surface and inherent moisture. The combination of surface and inherent moisture is modeled at 6.0%.

Russell County (Non-Material Property)

The Russell County property is not considered material to Coronado’s business or financial conditions. In addition, pursuant to the current mine plan, the property will only start generating cash flows when it commences production in 2039. Resources exclusive of reserves are based on assumed long-term average price of $125 to $128 per Mt (FOB loadout), representing the Company’s long-term average price forecast for Russell County. The pricing data assumes HVA FOB-mine prices with a weighted LOM average of approximately $208 per Mt. Marketable reserve tons are reported on a moist basis, including a combination of surface and inherent moisture. The combination of surface and inherent moisture is modeled at 6.0%.

Coronado Global Resources Inc. Form 10-K December 31, 2021 95


Table of Contents

 

Internal Controls

Our staff of geologists and engineers worked with the qualified persons throughout the mineral resource and reserve estimation process and provided data from our own exploration and operating activities at the properties. We have internal control procedures, including quality assurance/quality control procedures and internal verification of input data and geological modelling, subject to multi-level review, to help ensure the validity of the data. These procedures include, but are not limited to:

•Oversight and approval of each annual statement by responsible senior officers;

•Independent, external review of new and materially changed estimates at regular intervals;

•Annual reconciliation with internal planning by our staff of geologists and engineers to validate coal reserve and coal resource estimates for operating mines, including the following procedures:

•Assessments of drilling, sampling and quality assurance/quality control data, resource modelling, resource estimation, classification, and reporting;

•Assessment and benchmarking of production assumptions, mining rate and production schedules against historical production data;

•Assessments of capital and operating costs against other comparable projects for reasonableness;

•Continual identification and evaluation of material technical issues likely to impact the five-year plan and the future performance of producing properties;

•An examination of historical information and results in respect of the technical aspects of the properties by our staff of geologists and engineers, including a review of the following key elements:

•Geology mapping, reports and models, including geotechnical and hydrology aspects;

•Coal resource and coal reserve estimates;

•Mining operations and proposed growth options;

•Coal preparation facilities;

•Coal handling and transport;

•Environmental matters and approvals;

•Land management, including leases and other pertinent agreements;

•Veracity of existing information supporting five-year plans and business plans;

•Identification of key project drivers; and

•Risks and opportunities.

The pricing information used for preliminary resource valuation and to estimate our proven and probable coal reserves was based on prices under our existing contracts and price forecasts. Below is a description of some of the factors that could affect price forecasts for Met and thermal coal products on a mine-by-mine and product-by-product basis. Differences between the assumptions and analyses included in the price forecasts and realized factors could cause actual pricing to differ from the forecasts.

Metallurgical. Several factors can influence Met coal supply and demand and pricing. Demand is impacted by economic conditions and demand for steel and is also impacted by competing technologies used to make steel, some of which do not use coal as a manufacturing input. Competition from other types of coal is also a key price consideration and can be impacted by coal quality and characteristics, delivered energy cost (including transportation costs), customer service and support and reliability of supply.

Coronado Global Resources Inc. Form 10-K December 31, 2021 96


Table of Contents

 

Seaborne Met coal import demand can be significantly impacted by the availability of local coal production, particularly in leading Met coal import countries such as China and India, among others, as well as country-specific policies restricting or promoting domestic supply. The competitiveness of seaborne Met coal supply from leading Met coal exporting countries, such as Australia, the United States, Russia, Canada and Mongolia, among others, is also an important price consideration.

In addition to the factors noted above, the prices which may be obtained at each individual mine or future mine can be impacted by factors such as (i) the mine’s location, which impacts the total delivered energy costs to its customers, (ii) quality characteristics, particularly if they are unique relative to competing mines, (iii) assumed transportation costs and (iv) other mine costs that are contractually passed on to customers in certain commercial relationships.

Thermal. Several factors can influence thermal coal supply and demand and pricing. Demand is sensitive to total electric power generation volumes, which are determined in part by the impact of weather on heating and cooling demand, inter-fuel competition in the electric power generation mix, changes in capacity (additions and retirements), inter-basin or inter-country coal competition, coal stockpiles and policy and regulations. Supply considerations impacting pricing include reserve positions, mining methods, strip ratios, production costs and capacity and the cost of new supply (new mine developments or extensions at existing mines).

The cost information that the QPs used for preliminary resource valuation and to estimate our proven and probable reserves were generally internal projected future costs based on historical costs and expected future trends. The estimated costs normally include mining, processing, transportation, royalty, tax and other mining-related costs. Our estimated mining and processing costs reflect projected changes in prices of consumable commodities (mainly diesel fuel, natural gas, explosives and steel), labor costs, geological and mining conditions, targeted product qualities and other mining-related costs. Estimates for other sales-related costs (mainly transportation, royalty and tax) are based on contractual prices or fixed rates. Specific factors that may impact the cost at our various operations include:

•Geological settings. The geological characteristics of each mine are among the most important factors that determine the mining cost. Our geology department conducts the exploration program and provides geological models for the life-of-mine process. Coal seam depth, thickness, dipping angle, partings and quality constrain the available mining methods and size of operations. Shallow coal is typically mined by surface mining methods by which the primary cost is overburden removal. Deep coal is typically mined by underground mining methods where the primary costs include coal extraction, conveyance and roof control.

•Scale of operations and the equipment sizes. For surface mines, our dragline systems generally have a lower unit cost than truck-and-shovel systems for overburden removal. The longwall operations generally are more cost effective than bord-and-pillar operations for underground mines.

•Commodity prices. For surface mines, the costs of diesel fuel and explosives are major components of the total mining cost. For underground mines, the steel used for roof bolts represents a significant cost. Commodity price forecasts are used to project those costs in the financial models we use to establish our reserves.

•Target product quality. By targeting a premium quality, product, our mining and processing processes may experience more coal losses. By lowering product quality, the coal losses can be minimized and therefore a lower cost per Mt can be achieved. In our mine plans, the product qualities are estimated to correspond to existing contracts and forecasted market demands.

•Transportation costs. We have entered into arrangements with third parties to gain access to transportation infrastructure and services where required, including rail carriers and port owners. Where coal is exported or sold other than at the mine gate, the costs associated with these arrangements represent a significant portion of both the total cost of supplying coal to customers and of our production costs. As a result, the cost of transportation is not only a key factor in our cost base but also in the purchasing decision of customers. Our transportation costs vary by region. See Item 1. “Business—Transportation” for more information regarding transportation arrangements for our operations.

Coronado Global Resources Inc. Form 10-K December 31, 2021 97


Table of Contents

 

•Royalty costs. As conditions to certain of the Tenements, Curragh is subject to royalties payable to the Queensland government as described in Item 1. “Business—Regulatory Matters—Australia—Mineral Resources Act 1989 (Qld)”). These royalties are in addition to the Stanwell rebate, as described in Item 1. “Business—Customers—Australia Sales and Marketing—Stanwell.” Royalty costs at our U.S. Operations are based upon contractual agreements for the coal leased from private owners and vary from property to property and by the type of mine (i.e., surface or underground). The royalty rates under leases at our U.S. Operations range between 3% - 9% of revenues from coal sales. Under some of the leases, we are required to pay minimum royalties, regardless of production, and/or “wheelage fees” (i.e., fees payable on coal mined and removed from properties other than the particular leasehold and hauled across the leasehold premises).

•Black lung, severance and reclamation taxes. Our U.S. Operations are subject to a federal black lung excise tax on coal sold domestically.

•Exchange rates. Costs related to our Australian Operations are predominantly denominated in A$, while the coal that our Australian Operations export is sold in US$. As a result, A$-US$ exchange rates impact the U.S. dollar cost of our Australian Operations’ production.

For further discussion of comprehensive risk inherent in the estimation, see Item 1A. “Risk Factors—Operational and Technology Risks—We rely on estimates of our recoverable resources and reserves, which are complex due to geological characteristics of the properties and the number of assumptions made.”

Coronado Global Resources Inc. Form 10-K December 31, 2021 98


Table of Contents

 

ITEM 3. LEGAL PROCEEDINGS.

We are involved in various legal proceedings occurring in the ordinary course of business. It is the opinion of management, after consultation with legal counsel, that these matters will not materially affect our consolidated financial position, results of operations or cash flows.

The Company is subject to a wide variety of laws and regulations within the legal jurisdiction in which it operates. See “Part I, Item 1. Business—Regulatory Matters” for additional information. The Company believes that it is in substantial compliance with federal, state and local laws and regulations.

Coronado Global Resources Inc. Form 10-K December 31, 2021 99


Table of Contents

 

ITEM 4. MINE SAFETY DISCLOSURES

 

Safety is the cornerstone of the Company’s values and is the number one priority for all employees at Coronado Global Resources.

Our U.S. Operations include multiple mining complexes across three states and are regulated by both the U.S. Mine Safety and Health Administration, or MSHA, and state regulatory agencies. Under regulations mandated by the Federal Mine Safety and Health Act of 1977, or the Mine Act, MSHA inspects our U.S. mines on a regular basis and issues various citations and orders when it believes a violation has occurred under the Mine Act.

In accordance with Section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act and Item 104 of Regulation S-K (17 CFR 229.104), each operator of a coal or other mine is required to report certain mine safety results in its periodic reports filed with the SEC under the Exchange Act.

Information pertaining to mine safety matters is included in Exhibit 95.1 attached to this Annual Report on Form 10-K. The disclosures reflect the United States mining operations only, as these requirements do not apply to our mines operated outside the United States.

Coronado Global Resources Inc. Form 10-K December 31, 2021 100


Table of Contents

 

ITEM 5. MARKET FOR REGISTRANT’S COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES.

Market Information

Our CDIs, each representing one-tenth of one share of our common stock, have been listed on the ASX under the trading symbol “CRN” since October 23, 2018. Prior to such time, there was no public market for our securities. There is no principal market in the United States for our CDIs or shares of our common stock.

Holders

As of December 31, 2021, we had 167,645,373 shares of our common stock issued and outstanding with 5,278 holders of record. The holders included CHESS Depositary Nominees Pty Limited, which held 90,337,270 shares of our common stock in the form of CDIs on behalf of the CDI holders; there were 5,277 registered owners of our CDIs on December 31, 2021.

Series A Preferred Share

On September 20, 2018, we issued the Series A Preferred Share to Coronado Group LLC, at par value. The offer, sale, and issuance of the Series A Share were deemed to be exempt from registration under the Securities Act in reliance on Section 4(a)(2) of the Securities Act as transactions by an issuer not involving a public offering. The recipient of the Series A Share acquired the Series A Share for investment only and not with a view to or for sale in connection with any distribution thereof and appropriate legends were affixed to the Series A Share.

Dividends

The payment of dividends is at the discretion of the Board of Directors. The decision as to whether or not a dividend will be paid will be subject to a number of considerations including the general business environment, operating results, cash flows, future capital requirements, regulatory and contractual restrictions, as well as applicable covenants under the indenture governing our senior secured notes and covenants under the ABL Facility and any other factors the Board of Directors may consider relevant.

Our objective in setting our dividend policy is to deliver stockholder returns while maintaining flexibility to pursue our strategic initiatives within a prudent capital structure. Our dividend policy is to distribute between 60% and 100% of available free cash. Available free cash is defined as net cash from operating activities less capital expenditure, acquisition expenditure, amounts reserved for capital expenditure and acquisition expenditure and amounts required for debt servicing. In circumstances where there is surplus available free cash, at the discretion of our Board of Directors and in light of business and market conditions, we may consider the potential for additional stockholder returns through special dividends and share buy-backs as part of its broader capital management strategy.

Summary Description of the Company’s Non-Stockholder Approved Equity Compensation Plans

The Company does not have any non-stockholder approved equity compensation plans.

Recent Sales of Unregistered Securities

Other than as previously disclosed in a Quarterly Report on Form 10-Q or in a Current Report on Form 8-K, we did not issue any shares of our common stock in a transaction that was not registered under the Securities Act during the year ended December 31, 2021.

Purchases of Equity Securities by the Issuer and Affiliated Purchases

We had no repurchases of equity securities for the three months ended December 31, 2021.

Coronado Global Resources Inc. Form 10-K December 31, 2021 101


Table of Contents

 

ITEM 6. [Reserved]

Coronado Global Resources Inc. Form 10-K December 31, 2021 102


Table of Contents

 

ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The following Management’s Discussion and Analysis of our Financial Condition and Results of Operations, or MD&A, should be read in conjunction with the Consolidated Financial Statements and the related notes to those statements included elsewhere in this Annual Report on Form 10-K.

Overview

For the year ended December 31, 2021, we produced 17.4 MMt and sold 17.8 MMt of coal. Met coal and thermal coal sales represented 81.4% and 18.6%, respectively, of our total volume of coal sold and 94.6% and 5.4%, respectively, of total coal revenues.

During the year ended December 31, 2021, seaborne prices reached record highs with both the Australian and U.S. coal price indices increasing largely as result of continued strong global steel demand and supply disruptions, mainly in in Australia, North America and China, caused by mine closures due to safety and environmental factors, labor shortages impacting production output and adverse weather conditions.

Coronado has continued to take advantage of its unique geographical diversification as a Met coal supplier of scale to meet the requirements of steel customers across the globe. While Chinese import restrictions on Australian coal persisted throughout 2021, our U.S. Operations benefited from their ability to export coal to China in a favorable pricing environment during the year ended December 31, 2021.

Our results of operations for the year ended December 31, 2021 benefited from higher averaged realized Met coal price, lower capital expenditure across our business and the continued ramp up of production at our U.S. Operations driven by increased demand from China for U.S. sourced metallurgical coals.

Despite these favorable conditions, our results for the year ended December 31, 2021, were adversely impacted by (1) temporary suspension of certain mining operations at Curragh following a tragic fatality in November 2021 which constrained production in the fourth quarter; (2) effects of La Nina weather pattern in Australia, which disrupted certain mining and logistics activities, (3) operational issues at the Australian Operations due to breakdown of certain mining equipment, (4) cost of additional fleets deployed at Curragh to accelerate overburden removal to increase coal availability, (5) labor shortages at Logan due to COVID-19 and (6) adverse geological conditions in certain mines of our U.S. Operations.

Coal revenues from our Australian Operations for the year ended December 31, 2021 increased 35.8% compared to the same period in 2020, driven by increased average realized Met coal pricing from $94.4 to $143.1 per Mt sold. Sales volumes were lower for the year ended December 31, 2021 compared to the same period in 2020 due to temporary suspension of certain mining operations following a safety incident in November 2021, equipment breakdown and seasonally higher wet weather conditions. Operating costs for the year ended December 31, 2021 were $126.2 million, or 12.8%, higher compared to the corresponding period in 2020 driven by higher mining costs (due to accelerated overburden removal), royalties and freight expenses, which together with lower coal sales volume, resulted in an unfavorable increase in operating costs of $18.6 per Mt sold.

From our U.S. Operations, production and sales volumes were 1.2MMt and 0.6Mt higher, respectively, for the year ended December 31, 2021 compared to the same period in 2020, primarily due to mining operations, returning to pre- COVID-19 levels. Higher sales volumes and higher average realized Met coal prices per Mt sold during the year ended December 31, 2021 resulted in Coal revenues increasing by $347.2 million, or 72.1%, compared to the corresponding period in 2020. Operating costs for the year ended December 31, 2021 were $120.4 million, or 29.8% higher, compared to the corresponding period in 2020 driven by higher mining and freight costs.

Refinancing transaction

During the year ended December 31, 2021, we successfully completed a refinancing initiative which comprised of the ABL Facility with an aggregate principal amount of $100.0 million, an offering of 10.750% senior secured notes due 2026, or the Notes, in an aggregate principal amount of $350.0 million and a fully underwritten equity entitlement offer of $101.4 million. These transactions provide Coronado increased financial flexibility by eliminating the application of the financial covenants under the prior syndicated facility agreement, or the SFA, and introducing new debt with terms that are more sustainable for our business.

Refer to Note 7 “Capital Structure” and Note 17 “Interest bearing liabilities” to the consolidated financial statements included in Part II, Item 8, of this Annual Report on Form 10-K.

Coronado Global Resources Inc. Form 10-K December 31, 2021 103


Table of Contents

 

Notes Redemption

On November 16, 2021, we exercised our optional redemption rights and redeemed $35.0 million, or 10%, of the aggregate principal amount of our Notes at a redemption price equal to 103% of the principal amount of the Notes, plus accrued and unpaid interest on the Notes to, but not including, the date of redemption. We recorded a “Loss on debt extinguishment” of $2.8 million in the Consolidated Statement of Operations and Comprehensive Income, which represents the premium paid on redemption and a portion of unamortized debt issuance costs and discount on issuance.

Sale of Amonate Mining Asset

On December 2, 2021, we completed the sale of our Amonate mining asset to Ramaco Resources Inc. resulting in a pre-tax net realized gain of $14.8 million, comprised of sales proceeds of $30.0 million less carrying value of $12.6 million and transaction costs of $2.6 million, recorded within “Gain on disposal of assets” in our Consolidated Statement of Operations and Comprehensive Income for the year ended December 31, 2021.

Xcoal

On May 27, 2021, Xcoal Energy and Resources, or Xcoal, ceased to be a related party under U.S. GAAP, after Xcoal’s founder, chief executive officer and chief marketing officer, Mr. Ernie Thrasher, retired as a non-executive director of the Company.

 

During the year ended December 31, 2021, Xcoal repaid its past due balance of $85.2 million from 2020 in full. At December 31, 2021, we fully reversed the provision for discounting and credit losses of $9.0 million recorded at December 31, 2020.

 

“Coal revenues from related parties” of $97.3 million in the Consolidated Statements of Operations and Comprehensive Income for the period up to May 27, 2021, represent revenues from Xcoal while it was a related party. Revenues from coal sales to Xcoal after May 27, 2021 of $137.1 million for the year ended December 31, 2021, are included within “Coal revenues” in the Consolidated Statements of Operations and Comprehensive Income.

 

From July 1, 2021, we agreed to credit terms with Xcoal. Any sales in excess of the credit amount will be made on prepayment, letter of credit and cash on delivery basis.

 

At December 31, 2021, amounts outstanding from Xcoal in respect of coal sales was $35.2 million, of which $17.9 million was past due, and is included within “Trade receivables, net” on the Consolidated Balance Sheet. Subsequent to December 31, 2021, the Company has collected the Xcoal’s past due balance in full. The carrying value of trade receivables from Xcoal at December 31, 2021, net of provision for credit losses of $0.4 million, was $34.8 million.

Safety

For our Australian Operations, the twelve-month rolling average TRIFR at December 31, 2021 was 3.07 compared to 9.40 at the end of December 31, 2020. At our U.S. Operations, the twelve-month rolling average TRIR, at December 31, 2021 was 2.51 compared to 2.28 at the end of December 31, 2020. Reportable rates for our Australian and U.S. Operations are below the relevant industry benchmarks.

 

The safety of our workforce is our number one priority and Coronado remains focused on the safety and wellbeing of all employees and contracting parties.

COVID-19 response

The COVID-19 Steering Committee has successfully monitored the effect of the pandemic across our Australian Operations, and U.S. Operations and continues to implement proactive preventative measures to ensure the safety and well-being of employees and contractors. During the year ended December 31, 2021, we implemented a Vaccine Incentive Program at our U.S. Operations that provides a cash payment to employees who get vaccinated. Since the program commenced, vaccination rates amongst our U.S. workforce have improved significantly. At our Australian Operations, vaccination rates continue to increase according to the Australian Federal and Queensland state government’s vaccination program, reaching 90% of the Queensland state population fully vaccinated. Our efforts are now firmly behind the encouragement of booster shots to ensure prolonged protection. The COVID-19 Steering Committee continues to execute action plans to manage the risks associated with COVID-19 variants.

Coronado Global Resources Inc. Form 10-K December 31, 2021 104


Table of Contents

 

Segment Reporting

In accordance with Accounting Standards Codification, or ASC, 280, Segment Reporting, we have adopted the following reporting segments: Australia and the United States. In addition, “Other and Corporate” is not a reporting segment but is disclosed for the purposes of reconciliation to our consolidated financial statements.

Results of Operations

How We Evaluate Our Operations

We evaluate our operations based on the volume of coal we can safely produce and sell in compliance with regulatory standards, and the prices we receive for our coal. Our sales volume and sales prices are largely dependent upon the terms of our coal sales contracts, for which prices generally are set based on daily index averages, on a quarterly basis or annual fixed price contracts.

Our management uses a variety of financial and operating metrics to analyze our performance. These metrics are significant factors in assessing our operating results and profitability. These financial and operating metrics include: (i) safety and environmental metrics; (ii) total sales volumes and average realized price per Mt sold, which we define as total coal revenues divided by total sales volume; (iii) Met sales volumes and average realized Met price per Mt sold, which we define as Met coal revenues divided by Met sales volume; (iv) average segment mining costs per Mt sold, which we define as mining costs divided by sales volumes (excluding non-produced coal) for the respective segment; and (v) average segment operating costs per Mt sold, which we define as segment operating costs divided by sales volumes for the respective segment.

Coal revenues are shown on our statement of operations and comprehensive income exclusive of other revenues. Generally, export sale contracts for our Australian Operations require us to bear the cost of freight from our mines to the applicable outbound shipping port, while freight costs from the port to the end destination are typically borne by the customer. Sales to the export market from our U.S. Operations are generally recognized when title to the coal passes to the customer at the mine load out similar to a domestic sale. For our domestic sales, customers typically bear the cost of freight. As such, freight expenses are excluded from cost of coal revenues to allow for consistency and comparability in evaluating our operating performance.

Non-GAAP Financial Measures; Other Measures

The following discussion of our results includes references to and analysis of Adjusted EBITDA and mining costs, which are financial measures not recognized in accordance with U.S. GAAP. Non-GAAP financial measures, including Adjusted EBITDA, are used by investors to measure our operating performance.

Adjusted EBITDA, a non-GAAP measure, is defined as earnings before interest, tax, depreciation, depletion and amortization and other foreign exchange losses. Adjusted EBITDA is also adjusted for certain discrete non-recurring items that we exclude in analyzing each of our segments’ operating performance. Adjusted EBITDA is not intended to serve as an alternative to U.S. GAAP measures of performance and may not be comparable to similarly titled measures presented by other companies. A reconciliation of Adjusted EBITDA to its most directly comparable measure under U.S. GAAP is included below.

Segment Adjusted EBITDA is defined as Adjusted EBITDA by operating and reporting segment, adjusted for certain transactions, eliminations or adjustments that our CODM does not consider for making decisions to allocate resources among segments or assessing segment performance. Segment Adjusted EBITDA is used as a supplemental financial measure by management and by external users of our financial statements such as investors, industry analysts and lenders to assess the operating performance of the business.

Mining costs, a non-GAAP measure, is based on reported cost of coal revenues, which is shown on our statement of operations and comprehensive income exclusive of freight expense, Stanwell rebate, other royalties, depreciation, depletion and amortization and selling, general and administrative expenses, adjusted for other items that do not relate directly to the costs incurred to produce coal at mine. Mining costs excludes these cost components as our CODM does not view these costs as directly attributable to the production of coal. Mining costs is used as a supplemental financial measure by management, providing an accurate view of the costs directly attributable to the production of coal at our mining segments, and by external users of our financial statements, such as investors, industry analysts and ratings agencies, to assess our mine operating performance in comparison to the mine operating performance of other companies in the coal industry.

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 105


Table of Contents

 

Year Ended December 31, 2021 Compared to Year Ended December 31, 2020

Summary

The financial and operational highlights for the year ended December 31, 2021:

•Sales volume totaled 17.8 MMt for the year ended December 31, 2021, or 0.4 MMt lower than the year ended December 31, 2020. The lower sales volumes were attributable to our Australian Operations, primarily due to temporary suspension of operations following the fatality in November 2021, equipment breakdowns, wet weather conditions and labor shortage due to COVID-19.

•Net income increased by $416.0 million, from a net loss of $226.5 million for the year ended December 31, 2020, to a net income of $189.4 million for the year ended December 31, 2021. The higher net income was largely a result of higher coal sales revenues and the prior year including the impact of a non-cash impairment charge relating to Greenbrier, partially offset by higher operating costs, interest charges and income tax expense in 2021.

•Strong demand and higher prices in the seaborne Met coal market, especially in the second half of 2021 with coal index prices reaching record highs, caused by China's import policy decisions, post pandemic steel demand and impact of La Nina weather patterns, resulted in average realized Met pricing of $138.0 per Mt sold for the year ended December 31, 2021, or 52.5% higher compared to $90.5 per Mt sold for the year ended December 31, 2020.

•Adjusted EBITDA for the year ended December 31, 2021, totaled $486.1 million, an increase of $432.3 million, from Adjusted EBITDA of $53.8 million for the year ended December 31, 2020, driven by higher coal revenues partially offset by higher operating costs.

•Cash provided by operating activities was $442.0 million for the year ended December 31, 2021, an increase of $445.0 million compared to cash used of $3.0 million for the year ended December 31, 2020.

•As of December 31, 2021, the Company had total available liquidity of $537.7 million, consisting of $437.7 million of cash (excluding restricted cash) and $100 million of availability under the ABL Facility. The ABL Facility is subject to a springing fixed charge coverage ratio test if availability is less than a certain amount.

Coronado Global Resources Inc. Form 10-K December 31, 2021 106


Table of Contents

 

 

 

For Year Ended December 31,

 

 

($ in thousands)

 

 

2021

 

2020

 

Change

 

%

Revenues:

 

 

 

 

 

 

 

 

Coal revenues

 

2,108,331

 

1,423,599

 

684,732

 

48.1%

Other revenues

 

40,140

 

38,663

 

1,477

 

3.8%

Total revenues

 

2,148,471

 

1,462,262

 

686,209

 

46.9%

Costs and expenses:

 

 

 

 

 

 

 

 

Cost of coal revenues (exclusive of items shown separately below)

 

1,195,250

 

1,014,879

 

180,371

 

17.8%

Depreciation, depletion and amortization

 

177,875

 

191,189

 

(13,314)

 

(7.0%)

Freight expenses

 

241,862

 

185,863

 

55,999

 

30.1%

Stanwell rebate

 

55,403

 

103,039

 

(47,636)

 

(46.2%)

Other royalties

 

142,751

 

84,891

 

57,860

 

68.2%

Selling, general, and administrative expenses

 

30,666

 

30,352

 

314

 

1.0%

Restructuring costs

 

2,300

 

—

 

2,300

 

100.0%

Total costs and expenses

 

1,846,107

 

1,610,213

 

235,894

 

14.6%

Other income (expenses):

 

 

 

 

 

 

 

 

Interest expense, net

 

(68,062)

 

(50,585)

 

(17,477)

 

34.5%

Loss on debt extinguishment

 

(8,477)

 

—

 

(8,477)

 

100.0%

Impairment of assets

 

—

 

(78,111)

 

78,111

 

(100.0%)

Decrease (increase) in provision for discounting and credit losses

 

8,042

 

(9,298)

 

17,340

 

(186.5%)

Gain on disposal of asset

 

14,845

 

—

 

14,845

 

100.0%

Other, net

 

(6,187)

 

(608)

 

(5,579)

 

917.6%

Total other income (expense), net

 

(59,839)

 

(138,602)

 

78,763

 

(56.8%)

Net income (loss) before tax

 

242,525

 

(286,553)

 

529,078

 

184.6%

Income tax (expense) benefit

 

(53,102)

 

60,016

 

(113,118)

 

(188.5%)

Net (loss) income

 

189,423

 

(226,537)

 

415,960

 

183.6%

Less: Net loss attributable to noncontrolling interest

 

(2)

 

(69)

 

67

 

(97.1%)

Net income (loss) attributable to Coronado Global Resources Inc.

 

189,425

 

(226,468)

 

415,893

 

183.6%

 

Coal Revenues

Coal revenues were $2,108.3 million for the year ended December 31, 2021, an increase of $684.7 million, compared to $1,423.6 million for the year ended December 31, 2020. This increase was largely driven by higher sales volumes at our U.S. Operations and increased average realized Met coal price for the year ended December 31, 2021 of $138.0 per Mt sold, an increase of $47.4 per Mt sold compared to $90.5 per Mt sold for the same period in 2020, due to favorable market conditions and higher index prices, most significantly in the second half of 2021.

Cost of Coal Revenues (Exclusive of Items Shown Separately Below)

Cost of coal revenues is comprised of costs related to produced tons sold, along with changes in both the volumes and carrying values of coal inventory. Cost of coal revenues include items such as direct operating costs, which includes employee-related costs, materials and supplies, contractor services, coal handling and preparation costs and production taxes.

Total cost of coal revenues was $1,195.3 million for the year ended December 31, 2021, an increase of $180.4 million, or 17.8%, compared to $1,014.9 million for the year ended December 31, 2020. Cost of coal revenues for our U.S. Operations increased $60.9 million during the year ended December 31, 2021, as compared to the prior year, due to higher sales volumes and operations returning to pre-COVID-19 pandemic levels, whereas the U.S. Operations were idled for two months in prior year. Cost of coal revenues for our Australian Operations for the year ended December 31, 2021 were $119.5 million higher compared to the year ended December 31, 2020, driven by the additional fleet mobilized to accelerate overburden removal and unfavorable average foreign exchange rate on translation of the Australian Operations for the year ended December 31, 2021, of A$/US$: 0.75 compared to 0.69 for the same period in 2020.

Coronado Global Resources Inc. Form 10-K December 31, 2021 107


Table of Contents

 

Depreciation, Depletion and Amortization

Depreciation, depletion and amortization was $177.9 million for the year ended December 31, 2021, a decrease of $13.3 million, as compared to $191.2 million for the year ended December 31, 2020. The decrease was primarily associated with lower production in our Australian Operations impacting assets depreciated under units of production method. In addition, depreciation on the Greenbrier mining asset at our U.S. Operations ceased since its idling on April 1, 2020.

Freight Expenses

Freight expenses of $241.9 million for the year ended December 31, 2021, increased by $56.0 million, compared to $185.9 million for the year ended December 31, 2020. Our U.S. Operations contributed $47.4 million to the increase, due to higher sales volume related to certain contracts for which we arrange and pay for transportation to port that did not exist to the same extent in the comparative year. The remaining increase relates to our Australian Operations, primarily driven by higher demurrage costs and unfavorable average foreign exchange rate.

Stanwell Rebate

The Stanwell rebate was $55.4 million for the year ended December 31, 2021, a decrease of $47.6 million, compared to $103.0 million for the year ended December 31, 2020. The decrease was largely driven by lower realized export reference coal pricing for the prior twelve-month period, partially offset by unfavorable average foreign exchange rate on translation of the Australian Operations.

Other Royalties

Other royalties were $142.8 million for the year ended December 31, 2021, an increase of $57.9 million, as compared to $84.9 million for the year ended December 31, 2020. Higher royalties were primarily a result of higher average realized export pricing and increased sales volumes for the year ended December 31, 2021 compared to the same period in 2020.

Interest Expense, net

Interest expense, net of $68.1 million for the year ended December 31, 2021, increased $17.5 million, compared to $50.6 million for the year ended December 31, 2020. The increase in interest expense was due to a higher average interest rate for the year ended December 31, 2021, compared to prior year, partially offset by lower average interest-bearing liabilities period-over-period.

Decrease (increase) in provision for discounting and credit losses

We recognized a provision for discounting and credit losses of $9.3 million as at December 31, 2020, largely in respect of past due trade receivables from Xcoal. During the year ended December 31, 2021, the provision for discounting and credit losses, with respect to Xcoal past due balance, was fully unwound to account for passage of time and repayment in full, resulting in a benefit of $9.0 million recorded in the Company’s results of operations.

Gain on disposal of asset

On December 2, 2021, we completed the sale of the Amonate mining asset to Ramaco Resources Inc. for $30.0 million which resulted in a pre-tax net realized gain of $14.8 million after transaction costs of $2.6 million.

Income tax benefit (expense)

Income tax expense of $53.1 million for the year ended December 31, 2021, increased by $113.1 million, as compared to a tax benefit of $60.0 million for the year ended December 31, 2020.

The income tax expense for the year ended December 31, 2021 is based on an annual effective tax rate of 21.9%, an increase from 20.9% for the year ended December 31, 2020.

 

Year Ended December 31, 2020 Compared to Year Ended December 31, 2019

The Company’s comparison of 2020 results to 2019 results is included in the Company’s Annual Report on Form 10-K for the fiscal year ended December 31, 2020, under Part II Item 7, “Management’s Discussion and Analysis of Financial Condition and Results of Operations”.

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 108


Table of Contents

 

Supplemental Segment Financial Data

 

Year Ended December 31, 2021 Compared to Year Ended December 31, 2020

Australian Operations

 

 

For Year Ended December 31,

 

 

($ in thousands)

 

 

2021

 

2020

 

Change

 

%

Sales Volume (MMt)

 

11.3

 

12.4

 

(1.1)

 

(8.6)%

Total revenues ($)

 

1,315,851

 

976,369

 

339,482

 

34.8%

Coal revenues ($)

 

1,279,736

 

942,226

 

337,510

 

35.8%

Average realized price per Mt sold ($/Mt)

 

113.1

 

76.1

 

37.0

 

48.6%

Met sales volume (MMt)

 

8.2

 

8.9

 

(0.7)

 

(7.6)%

Met coal revenues ($)

 

1,171,869

 

836,545

 

335,324

 

40.1%

Average realized Met price per Mt sold ($/Mt)

 

143.1

 

94.4

 

48.7

 

51.6%

Mining costs ($)

 

736,782

 

640,113

 

96,669

 

15.1%

Mining costs per Mt sold ($/Mt)

 

67.6

 

52.9

 

14.7

 

27.8%

Operating costs ($)

 

1,111,248

 

985,077

 

126,171

 

12.8%

Operating costs per Mt sold ($/Mt)

 

98.2

 

79.6

 

18.6

 

23.4%

Segment Adjusted EBITDA ($)

 

204,992

 

(8,586)

 

213,578

 

2,487.5%

 

Coal revenues for Australian Operations for the year ended December 31, 2021, were $1,279.7 million, an increase of $337.5 million, or 35.8%, compared to $942.2 million for the year ended December 31, 2020. This increase was largely driven by higher average realized Met price of $143.1 per Mt, an increase of $48.7 per Mt, compared to $94.4 per Mt sold during the same period in 2020 benefiting from strong demand and supply shortage in the global seaborne export markets rising the Met coal pricing index during 2021. This increase was partially offset by lower sales volume of 11.3 MMt compared to 12.4 MMt for the year ended December 31, 2020 due to lower production.

Operating costs increased by $126.2 million, or 12.8%, for the year ended December 31, 2021, compared to the year ended December 31, 2020. The increase was driven by higher mining costs, other royalties and freight costs, partially offset by lower Stanwell rebate (mainly due to lower realized coal pricing on a twelve-month look back period). Mining cost per ton of $67.6 per Mt sold was 27.8% higher compared to the year ended December 31, 2020, impacted by temporary suspension of mining operations following safety incident, above-average wet weather, mining equipment breakdown, labor shortages, planned equipment maintenance, additional fleets mobilized to accelerate overburden removal and unfavorable average foreign exchange rate on translation of the Australian Operations for the year ended December 31, 2021 compared to the year ended December 31, 2020.

For the year ended December 31, 2021, Segment Adjusted EBITDA was $205.0 million, an increase of $213.6 million compared to Segment Adjusted EBITDA loss of $8.6 million for the year ended December 31, 2020. This increase was primarily driven by higher coal revenues partially offset by higher operating costs.

United States

 

 

For Year Ended December 31,

 

 

($ in thousands)

 

 

2021

 

2020

 

Change

 

%

Sales Volume (MMt)

 

6.4

 

5.8

 

0.6

 

11.5%

Total revenues ($)

 

832,620

 

485,893

 

346,727

 

71.4%

Coal revenues ($)

 

828,595

 

481,373

 

347,222

 

72.1%

Average realized price per Mt sold ($/Mt)

 

128.6

 

83.3

 

45.3

 

54.3%

Met sales volume (MMt)

 

6.3

 

5.6

 

0.7

 

11.1%

Met coal revenues ($)

 

822,000

 

476,222

 

345,778

 

72.6%

Average realized Met price per Mt sold ($/Mt)

 

131.2

 

84.4

 

46.8

 

55.4%

Mining costs ($)

 

392,362

 

350,886

 

41,476

 

11.8%

Mining costs per Mt sold ($/Mt)

 

62.3

 

61.4

 

0.9

 

1.5%

Operating costs ($)

 

524,018

 

403,595

 

120,423

 

29.8%

Operating costs per Mt sold ($/Mt)

 

81.3

 

69.9

 

11.4

 

16.3%

Segment Adjusted EBITDA ($)

 

312,048

 

92,801

 

219,247

 

236.3%

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 109


Table of Contents

 

Coal revenues increased by $346.7 million, or 72.1%, to $828.6 million for the twelve months ended December 31, 2021, compared to $481.4 million for the year ended December 31, 2020. This increase was mainly driven by higher Met coal sales volumes driven by strong U.S. sourced coal demand, particularly into China, exceeding pre-COVID-19 pandemic levels, whereas the U.S. Operations were idled for two months during the year ended December 31, 2020.

Additionally, our U.S. Operations saw an increase in average realized Met coal pricing of $46.8 per Mt sold to $131.2 per Mt sold for the year ended December 31, 2021, compared to $84.4 per Mt sold for the 2020 period. The increase reflected a strong U.S.-sourced coal demand into China following Chinese restrictions on imports of Australian-sourced coal.

Operating costs increased by $120.4 million, or 29.8%, to $524.0 million for the year ended December 31, 2021, compared to operating costs of $403.6 million for the year ended December 31, 2020. The increase was primarily due to higher mining costs of $41.5 million, an increase of 11.8% compared to the same period in 2020, as a result of production returning to pre-COVID-19 pandemic levels, whereas the U.S. Operations were idled for two months during the year ended December 31, 2020, combined with higher freight expenses driven by increase in sales volume and for certain contracts for which we arrange and pay for transportation costs that did not exist to the same extent in the prior year.

Segment Adjusted EBITDA of $312.0 million for the year ended December 31, 2021 increased by $219.2 million compared to Segment Adjusted EBITDA of $92.8 million for the year ended December 31, 2020. This increase was primarily driven by demand and production returning and exceeding pre-COVID-19 pandemic levels, higher average realized Met coal price per Mt sold and increased sales volumes, partially offset by higher operating costs.

Corporate and Other Adjusted EBITDA

The following table presents a summary of the components of Corporate and Other Adjusted EBITDA:

 

 

For Year Ended December 31,

 

 

($ in thousands)

 

 

2021

 

2020

 

Change

 

%

Selling, general, and administrative expenses

 

30,666

 

30,352

 

314

 

(1.0)%

Other, net

 

241

 

64

 

177

 

(276.6)%

Total Corporate and Other Adjusted EBITDA

 

30,907

 

30,416

 

491

 

(1.6)%

 

Corporate and other costs for the year ended December 31, 2021, remained largely consistent compared to the year ended December 31, 2020.

Coronado Global Resources Inc. Form 10-K December 31, 2021 110


Table of Contents

 

Mining and operating costs for the Twelve Months Ended December 31, 2021 compared to Twelve Months Ended December 31, 2020

A reconciliation of segment costs and expenses, segment operating costs, and segment mining costs is shown below:

 

 

For Twelve Months Ended December 31, 2021

 

 

($ in thousands)

 

 

Australia

 

United States

 

Other / Corporate

 

Total Consolidated

Total costs and expenses

 

1,202,807

 

611,611

 

31,689

 

1,846,107

Less: Selling, general and administrative expense

 

—

 

—

 

(30,666)

 

(30,666)

Less: Restructuring costs

 

(2,300)

 

—

 

—

 

(2,300)

Less: Depreciation, depletion and amortization

 

(89,259)

 

(87,593)

 

(1,023)

 

(177,875)

Total operating costs

 

1,111,248

 

524,018

 

—

 

1,635,266

Less: Other royalties

 

(117,001)

 

(25,750)

 

—

 

(142,751)

Less: Stanwell rebate

 

(55,403)

 

—

 

—

 

(55,403)

Less: Freight expenses

 

(161,703)

 

(80,159)

 

—

 

(241,862)

Less: Other non-mining costs

 

(40,359)

 

(25,747)

 

—

 

(66,106)

Total mining costs

 

736,782

 

392,362

 

—

 

1,129,144

Sales Volume excluding non-produced coal (MMt)

 

10.9

 

6.3

 

—

 

17.2

Mining cost per Mt sold ($/Mt)

 

67.6

 

62.3

 

—

 

65.7

 

 

 

 

 

 

 

 

 

 

 

For Twelve Months Ended December 31, 2020

 

 

($ in thousands)

 

 

Australia

 

United States

 

Other / Corporate

 

Total Consolidated

Total costs and expenses

 

1,082,640

 

496,462

 

31,111

 

1,610,213

Less: Selling, general and administrative expense

 

—

 

—

 

(30,352)

 

(30,352)

Less: Depreciation, depletion and amortization

 

(97,563)

 

(92,867)

 

(759)

 

(191,189)

Total operating costs

 

985,077

 

403,595

 

—

 

1,388,672

Less: Other royalties

 

(71,317)

 

(13,574)

 

—

 

(84,891)

Less: Stanwell rebate

 

(103,039)

 

—

 

—

 

(103,039)

Less: Freight expenses

 

(153,064)

 

(32,799)

 

—

 

(185,863)

Less: Other non-mining costs

 

(17,544)

 

(6,336)

 

—

 

(23,880)

Total mining costs

 

640,113

 

350,886

 

—

 

990,999

Sales Volume excluding non-produced coal (MMt)

 

12.1

 

5.7

 

—

 

17.8

Mining cost per Mt sold ($/Mt)

 

52.9

 

61.4

 

—

 

55.6

 

Average realized Met price for the Twelve Months Ended December 31, 2021 compared to Twelve Months Ended December 31, 2020

A reconciliation of the Company’s average realized Met coal revenue is shown below:

 

 

 

For Year Ended December 31,

 

 

($ in thousands)

 

 

2021

 

2020

 

Change

 

%

Met sales volume (MMt)

 

14.5

 

14.5

 

—

 

—

Met coal revenues ($)

 

1,993,869

 

1,312,767

 

681,102

 

51.9%

Average realized met price per Mt sold ($/Mt)

 

138.0

 

90.5

 

47.4

 

52.5%

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 111


Table of Contents

 

Reconciliation of Non-GAAP Financial Measures

Adjusted EBITDA

 

 

For year ended December 31,

 

 

2021

 

2020

 

2019

 

 

(US $ thousands)

Reconciliation to Adjusted EBITDA:

 

 

 

 

 

 

Net income (loss)

 

189,423

 

(226,537)

 

305,477

Add: Depreciation, depletion and amortization

 

177,875

 

191,189

 

176,461

Add: Interest expense, net

 

68,062

 

50,585

 

39,294

Add: Other foreign exchange (gains) losses

 

7,049

 

1,175

 

(1,745)

Add: Loss on debt extinguishment

 

8,477

 

—

 

—

Add: Income tax expense (benefit)

 

53,102

 

(60,016)

 

114,681

Add: Impairment of assets

 

—

 

78,111

 

—

Add: Restructuring costs

 

2,300

 

—

 

—

Add: Losses on idled assets held for sale

 

2,732

 

9,994

 

—

Add: Gain on disposal of asset held for sale

 

(14,845)

 

—

 

—

Add: (Decrease) increase in provision for discounting

and credit losses

 

(8,042)

 

9,298

 

—

Adjusted EBITDA

 

486,133

 

53,799

 

634,168

 

Liquidity and Capital Resources

Overview

Our objective is to maintain a prudent capital structure and to ensure that sufficient liquid assets and funding is available to meet both anticipated and unanticipated financial obligations, including unforeseen events that could have an adverse impact on revenues or costs. Our principal sources of funds are cash and cash equivalents, cash flow from operations and availability under the ABL Facility.

Our main uses of cash have historically been, and are expected to continue to be, the funding of our operations, working capital, capital expenditure, debt service obligations, business or assets acquisitions and payment of dividends. Based on our outlook for the next twelve months, which is subject to continued changing demand from our customers, volatility in coal prices, ongoing interruptions and uncertainties surrounding China’s import restrictions, such as trade barriers imposed by China on Australian-sourced coal and the uncertainty of impacts from the COVID- 19 pandemic on the global economy, we believe expected cash generated from operations together with available borrowing facilities and other strategic and financial initiatives, will be sufficient to meet the needs of our existing operations, capital expenditure and service our debt obligations.

Our ability to generate sufficient cash depends on our future performance which may be subject to a number of factors beyond our control, including general economic, financial and competitive conditions and other risks described in Part I, Item 1A. “Risk Factors” of this Annual Report on Form 10-K.

Liquidity as of December 31, 2021 and December 31, 2020 was as follows:

 

 

December 31,

 

 

2021

 

2020

 

 

($ in thousands)

Cash, excluding restricted cash

 

437,679

 

45,485

Availability under ABL Facility(1)

 

100,000

 

—

Availability under Revolving Syndicate Facility Agreement

 

—

 

222,375

Total

 

537,679

 

267,860

 

(1) The ABL Facility contains a springing fixed charge coverage ratio of not less than 1.00 to 1.00, which ratio is tested if availability under the ABL Facility is less than $17.5 million for five consecutive business days or less than $15.0 million on any business day.

Coronado Global Resources Inc. Form 10-K December 31, 2021 112


Table of Contents

 

Our total indebtedness as of December 31, 2021 and December 31, 2020 consisted of the following:

 

 

2021

 

2020

 

 

($ in thousands)

Current instalments of other financial liabilities and finance lease obligations

 

8,634

 

4,231

Current instalments of interest bearing liabilities

 

315,000

 

324,727

Other financial liabilities and finance lease obligations, excluding current instalments

 

14,031

 

—

Total

 

337,665

 

328,958

 

Liquidity

As of December 31, 2021, available liquidity was $537.7 million, comprising cash and cash equivalents (excluding restricted cash) of $437.7 million and $100.0 million of available borrowings under our ABL Facility.

As of December 31, 2020, available liquidity was $267.9 million comprising cash and cash equivalents (excluding restricted cash) of $45.5 million and $222.4 million of available borrowing facilities.

In light of the COVID-19 pandemic, the Company has taken steps to strengthen its financial position and maintain financial flexibility.

On January 6, 2021, we raised financing of $23.5 million (A$30.2 million) following the completion of sale and leaseback arrangements with a third-party financier for selected heavy mining equipment assets at our Australian Operations. The proceeds we received from the transaction were used to repay a portion of drawn balances under the extinguished SFA.

On May 12, 2021, we successfully completed a refinancing initiative, which consisted of the ABL Facility of $100.0 million, an offering of $350.0 million aggregate principal amount of the Notes and the fully underwritten equity Entitlement Offer of $101.4 million. A portion of the proceeds from these transactions were used to, among other things (i) repay all outstanding obligations under the SFA, and to terminate such agreement; (ii) cash collateralize and replace bank guarantees previously issued under the SFA; and (iii) pay discounts, fees and expenses related to the refinancing transactions.

The new capital structure provides the Company financial flexibility by eliminating the application of the financial covenants under the SFA and introducing new debt with terms that are more sustainable for our business. The arrangements also extended the debt maturity profile, provide a diversification of funding sources and strengthens our liquidity position.

On December 2, 2021, the Company completed the sale of Amonate, an idled non-core mining property, including related assets and liabilities to Ramaco Resources, Inc., a Delaware corporation, for a purchase price of $30.0 million. The proceeds from sale added to the surplus cash as of December 31, 2021.

The Company continues to actively review plans for reducing operating, corporate and capital expenditures to ensure sufficient available liquidity during this period of uncertainty and volatility.

Cash

Cash is held in multicurrency interest bearing bank accounts available to be used to service the working capital needs of the Company. Cash balances surplus to immediate working capital requirements are invested in short-term interest-bearing deposit accounts or used to repay interest bearing liabilities.

Senior Secured Notes

On May 12, 2021, we issued $350.0 million aggregate principal amount of 10.750% Senior Secured Notes due 2026. The Notes were issued at a price of 98.112% of their principal amount and mature on May 15, 2026. Interest on the Notes is payable semiannually in arrears on May 15 and November 15 of each year. The Notes are senior secured obligations of the Company.

The terms of the Notes are governed by the Indenture which contains customary covenants for high yield bonds, including, but not limited to, limitation on certain investments, liens, indebtedness, asset sales, transactions with affiliates and restricted payments, including payment of dividends on capital stock.

Coronado Global Resources Inc. Form 10-K December 31, 2021 113


Table of Contents

 

The Indenture also contains customary events of default, including failure to make required payments, failure to comply with certain agreements or covenants, failure to pay or acceleration of certain other indebtedness, certain events of bankruptcy and insolvency, and failure to pay certain judgments. An event of default under the Indenture will allow either the Trustee or the holders of at least 25% in aggregate principal amount of the then-outstanding Notes to accelerate, or in certain cases, will automatically cause the acceleration of, the amounts due under the Notes.

On November 16, 2021, or the Redemption Date, we exercised our optional redemption rights and redeemed $35.0 million, or 10%, of the aggregate principal amount of the Notes. The redemption price equaled to 103% of the principal amount of the Notes redeemed, plus accrued and unpaid interest on the Notes to, but not including, the Redemption Date in accordance with the terms of the Notes and the Indenture.

As of December 31, 2021, we were in compliance with all applicable covenants under the Indenture.

ABL Facility

On May 12, 2021, we entered into the ABL Facility agreement with an aggregate multi-currency lender commitment of up to $100.0 million, including a $30.0 million sublimit for the issuance of letters of credit and $5.0 million for swingline loans. As of December 31, 2021, no amounts were outstanding, and no outstanding letters of credit issued under the ABL Facility. The ABL Facility will mature on May 12, 2024.

Availability under the ABL Facility is limited to an eligible borrowing base, determined by applying customary advance rates to eligible accounts receivable and inventory and deducting certain reserves, which may be established by the agent in its reasonable credit discretion that could reasonably be expected to have an adverse effect on the value of the collateral included in the borrowing base.

Borrowings under the ABL facility bear interest at a rate equal to a BBSY rate plus an applicable margin. In addition to paying interest, we are also required to pay a fee in respect of unutilized commitments, on amounts available to be drawn under outstanding letters of credits and certain administrative fees.

The ABL Facility contains customary representations and warranties and affirmative and negative covenants including, among others, a covenant regarding the maintenance of a fixed charge coverage ratio if certain conditions are triggered, covenants relating to financial reporting, covenants relating to the payment of dividends on, or purchase or redemption of, our capital stock, covenants relating to the incurrence or prepayment of certain debt, and covenants relating to the incurrence of liens or encumbrances, compliance with laws, transactions with affiliates, mergers and sales of all or substantially all of the our assets and limitations on changes in the nature of the Company’s business

As of December 31, 2021, we were in compliance with all applicable covenants under the ABL Facility.

Bank Guarantees and Surety Bonds

We are required to provide financial assurances and securities to satisfy contractual and other requirements generated in the normal course of business. Some of these assurances are provided to comply with state or other government agencies’ statutes and regulations. As of December 31, 2021, we had outstanding bank guarantees of $45.8 million to secure various obligations and commitments. The Company provided cash, in the form of deposits, as collateral against these bank guarantees.

Coronado Global Resources Inc. Form 10-K December 31, 2021 114


Table of Contents

 

For the U.S. Operations, in order to provide the required financial assurance, we generally use surety bonds for post-mining reclamation. We can also use bank letters of credit to collateralize certain obligations. As of December 31, 2021, we had outstanding surety bonds of $29.6 million, to secure various obligations and commitments. Future regulatory changes relating to these obligations could result in increased obligations, additional costs or additional collateral requirements.

Dividend

During the year ended December 31, 2021, we did not pay dividends to stockholders or CDI holders on the ASX.

The Company announced its plans to declare and pay unfranked dividends of up to $151 million in the first quarter of 2022, subject to, among other matters, final approval by our Board of Directors. In connection with the planned dividend, Coronado Finance Pty Ltd, a wholly-owned subsidiary of the Company plans to offer to purchase up to $100 million aggregate principal amount of the Notes pursuant to the terms of the Indenture. The payment of such dividend is not contingent on acceptance of the offer to purchase the Notes by the Note holders.

Capital Requirements

Our main uses of cash have historically been the funding of our operations, working capital, capital expenditure, the payment of interest and dividends. Following the refinancing transaction in May 2021, we intend to use cash to fund debt service payments on our Notes, the ABL Facility and our other indebtedness, to fund operating activities, working capital, capital expenditures, partial redemption of the Notes, business or assets acquisitions and, if declared, payment of dividends.

Historical Cash Flows

The following table summarizes our cash flows for the year ended December 31, 2021, 2020 and 2019 as reported in the accompanying consolidated financial statements:

Cash Flow

 

 

For Year Ended December 31,

 

 

2021

 

2020

 

2019

 

 

($ in thousands)

 

 

Net cash provided by (used in) operating activities

 

442,014

 

(3,000)

 

477,426

Net cash used in investing activities

 

(134,332)

 

(114,128)

 

(183,730)

Net cash provided by (used in) financing activities

 

80,836

 

137,526

 

(391,029)

Net change in cash and cash equivalents

 

388,518

 

20,398

 

(97,333)

Effect of exchange rate changes on cash and restricted cash

 

3,677

 

(1,215)

 

(995)

Cash and restricted cash at beginning of period

 

45,736

 

26,553

 

124,881

Cash and restricted cash at end of period

 

437,931

 

45,736

 

26,553

 

Operating activities

Net cash provided by operating activities was $442.0 million for the year ended December 31, 2021, compared to a cash used in operating activities of $3.0 million for the year ended December 31, 2020. The increase in cash provided by operating activities was driven by favorable movement in working capital and increase in coal revenues during the year partially offset by higher operating costs.

Net cash used in operating activities was $3.0 million and provided by operating activities was $477.4 million for the year ended December 31, 2020 and 2019 respectively. The decrease in cash from operating activities was primarily due to the decline in revenues in the period partially offset by lower operating costs.

Investing activities

Net cash used in investing activities was $134.3 million for the year ended December 31, 2021, compared to $114.1 million for the year ended December 31, 2020. Cash spent on capital expenditures for the year ended December 31, 2021 was $89.7 million, of which $37.9 million related to the Australian Operations, $50.1 million related to the U.S. Operations and the remaining $1.6 million for other and corporate. During the year ended December 31, 2021, a net of $73.7 million of additional deposits were provided as collateral for bank guarantees and our U.S. workers compensation obligations. Partially offsetting the cash used, was net proceeds of $27.5 million generated during the year ended December 31, 2021 from the sale of Amonate.

Coronado Global Resources Inc. Form 10-K December 31, 2021 115


Table of Contents

 

Net cash used in investing activities was $114.1 million for the year ended December 31, 2020, compared to $183.7 million for the year ended December 31, 2019. Capital expenditure for the year ended December 31, 2020 was $117.9 million, of which $47.5 million related to the Australian Operations, $68.9 million related to the U.S. Operations and the remaining $1.5 million for other and corporate. Included in the capital expenditure for the U.S. Operations was an acquisition of new reserves of $6.0 million. During the year ended December 31, 2020, a net of $3.7 million of deposits and reclamation bonds were redeemed and replaced with standby letters of credit.

Financing activities

Net cash provided by financing activities was $80.8 million for the year ended December 31, 2021, compared to $137.5 million for the year ended December 31, 2021. Included in the net cash provided by financing activities for the year ended December 31, 2021, were net proceeds from borrowings of $396.3 million, repayment of borrowings of $413.2 million and net proceeds from the stock issuance of $97.7 million.

Net cash provided by financing activities was $137.5 million for the year ended December 31, 2020, compared to $391.0 million of net cash used in financing activities during the year ended December 31, 2019. Included in the net cash provided in financing activities for the year ended December 31, 2020, were proceeds from borrowings of $205.0 million, net proceeds from stock issuance (the Placement and Entitlement Offer) of $171.6 million, repayment of borrowings of $207.4 million, and $24.2 million for dividends paid to the shareholders of the Company.

Contractual Obligations

The following is a summary of our contractual obligations at December 31, 2021:

 

 

Payments Due By Year

 

 

 

 

Less than

 

1 ‑ 3

 

3 ‑ 5

 

More than

 

 

Total

 

1 Year

 

Years

 

Years

 

5 Years

 

 

($ in thousands)

Long‑term debt obligations(1)

 

22,681

 

8,598

 

8,236

 

5,847

 

—

Senior secured notes (2)

 

315,000

 

—

 

—

 

315,000

 

—

Mineral lease commitments(3)

 

53,507

 

6,354

 

10,885

 

10,391

 

25,877

Operating and finance lease commitments

 

23,712

 

9,562

 

12,463

 

1,687

 

—

Unconditional purchase obligations(4)

 

24,122

 

24,122

 

—

 

—

 

—

Take‑or‑pay contracts(5)

 

1,183,370

 

115,795

 

225,110

 

228,199

 

614,266

Total contractual cash obligations

 

1,622,392

 

164,431

 

256,694

 

561,124

 

640,143


(1)Represents financial obligation relating to amounts outstanding from financing equipment purchases, insurance premiums and financial liabilities for a sale and lease back type arrangement.

(2)Represents financial obligation outstanding under the Senior Secured Notes. Refer to Note 17. “Interest bearing liabilities” in the accompanying audited consolidated financial statements for additional discussion.

(3) Represents future minimum royalties and payments under mineral leases. Refer to Note 27. “Commitments” in the accompanying audited consolidated financial statements for additional discussion.

(4)Represents firm purchase commitments for capital expenditures (based on order to suppliers for capital purchases) for 2022.

(5)Represents various short- and long-term take-or-pay arrangements in Australia associated with rail and port commitments for the delivery of coal.

This table does not include our estimated Asset Retirement Obligations, or ARO. As discussed in “—Critical Accounting Policies and Estimates—Carrying Value of Asset Retirement Obligations” below, the current and non-current carrying amount of our ARO involves several estimates, including the amount and timing of the payments required to satisfy these obligations. The timing of payments is based on numerous factors, including projected mine closure dates. Based on our assumptions, the carrying amount of our ARO as determined in accordance with U.S. GAAP was $120.3 million as of December 31, 2021.

Coronado Global Resources Inc. Form 10-K December 31, 2021 116


Table of Contents

 

Off-Balance Sheet Arrangements

In the normal course of business, we are a party to certain off-balance sheet arrangements. These arrangements include guarantees, indemnifications and financial instruments with off-balance sheet risk, such as bank letters of credit, bank guarantees and performance or surety bonds (including reclamation bonds). Obligations related to these arrangements are not reflected in our balance sheet. However, the underlying liabilities that they secure, such as asset retirement obligations, workers’ compensation liabilities, and royalty obligations, are reflected in our balance sheet.

We are required to provide financial assurance in order to perform the post-mining reclamation required by our mining permits, pay workers’ compensation claims, including black lung, under workers’ compensation laws in various states, and perform certain other obligations.

For our U.S. Operations in order to provide the required financial assurance, we generally use surety bonds for post-mining reclamation. We can also use bank letters of credit to collateralize certain obligations. As of December 31, 2021, we had outstanding surety bonds with a total face amount of $29.6 million and letters of credit of $16.8 million issued from our available bank guarantees, to secure various obligations and commitments. There are no cash collateral requirements to secure these surety bond obligations.

For our Australian Operations, we are required to provide financial assurances and securities to satisfy contractual and other requirements generated in the normal course of business. Some of these assurances are provided to comply with state or other government agencies’ statutes and regulations.

In order to satisfy some of the above obligations, we issued bank guarantees of $45.8 million. The Company provided cash, in the form of deposits, as collateral against these bank guarantees.

We meet frequently with our surety providers and have discussions with certain providers regarding the extent of and the terms of their participation in the program. These discussions may cause us to shift surety bonds between providers or to alter the terms of their participation in our program. To the extent that surety bonds become unavailable or our surety bond providers require additional collateral, we would seek to secure our obligations with letters of credit, available bank guarantee facility, cash deposits or other suitable forms of collateral. Our failure to maintain, or inability to acquire, surety bonds or to provide a suitable alternative would have a material adverse effect on our liquidity as letters of credit may be more costly and may reduce the amounts that we can borrow under our credit facility for other purposes. These failures could result from a variety of factors including lack of availability, higher cost or unfavorable market terms of new surety bonds, and the exercise by third-party surety bond issuers of their right to refuse to renew the surety.

Critical Accounting Policies and Estimates

The preparation of our financial statements in conformity with U.S. GAAP requires us to make estimates and assumptions that affect the reported amounts of assets and liabilities at the date of the financial statements and the reported amounts of revenue and expenses during the reporting period. Listed below are the accounting estimates that we believe are critical to our financial statements due to the degree of uncertainty regarding the estimates or assumptions involved and the magnitude of the asset, liability, revenue or expense being reported. All of these accounting estimates and assumptions, as well as the resulting impact to our financial statements, have been discussed with the Audit, Governance and Risk Committee, or Audit Committee, of our Board of Directors.

Fair Value of Non-Financial Assets

Our non-financial assets valuations are primarily comprised of our determination of the estimated fair value allocation of net tangible and intangible assets, our annual assessment of the recoverability of our goodwill and our evaluation of the recoverability of our other long-lived assets upon certain triggering events.

Long-Lived Assets

We review the carrying value of intangible assets with definite lives and other long-lived assets to be used in operations annually or whenever events or changes in circumstances indicate that the carrying amount of the assets or asset groups might not be recoverable.

Factors that would necessitate an impairment assessment include a significant adverse change in the extent or manner in which an asset is used, a significant adverse change in legal factors or the business climate that could affect the value of the asset group or a significant decline in the observable market value of an asset group, among others. If such facts indicate a potential impairment, the recoverability of the asset group is assessed by determining whether the carrying value of the asset group exceeds the sum of the projected undiscounted cash

Coronado Global Resources Inc. Form 10-K December 31, 2021 117


Table of Contents

 

flows expected to result from the use and eventual disposition of the asset group over the remaining economic life of the asset group. If the projected undiscounted cash flows are less than the carrying amount, an impairment is recorded for the excess of the carrying amount over the estimate fair value, which is generally determined using discounted future cash flows. Any such write down is included in impairment expense in our consolidated statement of operations.

A high degree of judgment is required to estimate the fair value of our intangible and long-lived assets, and the conclusions that we reach could vary significantly based upon these judgments. We make various assumptions, including assumptions regarding future cash flows in our assessments of fair value. The assumptions about future cash flows and growth rates are based on the current and long-term business plans related to the long-lived assets. Discount rate assumptions are based on an assessment of the risk inherent in the future cash flows of the long-lived assets.

Goodwill Impairment

We had a balance of goodwill of $28.0 million recorded at December 31, 2021, which was generated upon the acquisition of Buchanan in 2016. We perform our annual assessment of the recoverability of our goodwill in the fourth quarter each year. We utilize a qualitative assessment for determining whether the quantitative goodwill impairment analysis is necessary. The accounting guidance permits entities to first assess qualitative factors to determine whether it is more likely than not that the fair value of a reporting unit is less than its carrying amount as a basis for determining whether it is necessary to perform the quantitative goodwill impairment test. In evaluating goodwill on a qualitative basis, we review the business performance of the Buchanan mine complex (the only reporting unit with a goodwill balance) and evaluate other relevant factors as identified in the relevant accounting guidance to determine whether it is more likely than not that an indicator of impairment exists at Buchanan. We consider whether there are any negative macroeconomic conditions, industry specific conditions, market changes, increased competition, increased costs in doing business, management challenges, legal environments and how these factors might impact company specific performance in future periods. As part of the analysis, we also consider fair value determinations for certain reporting units that have been made at various points throughout the current and prior year for other purposes to ensure there is no contrary evidence to our analysis. At December 31, 2021, we did not perform a quantitative impairment assessment as we determined, based on our qualitative assessment, that no impairment indicators existed.

Assets held for sale

The Company classifies assets and liabilities as held for sale (disposal group) when management, having the authority to approve the action, commits to a plan to sell the disposal group, the sale is probable within one year and the disposal group is available for sale in its present condition. The Company also considers whether an active program to locate a buyer has been initiated, whether the disposal group is marketed actively for sale at a price that is reasonable in relation to its current fair value, and whether actions required to complete the plan indicate that it is unlikely that significant changes to the plan will be made or that the plan will be withdrawn.

Assets held for sale are measured at the lower of their carrying amount or fair value less costs to sell. An impairment test is performed when a disposal group is classified as held for sale and an impairment charge is recorded when the carrying value of the disposal group exceeds its estimated fair value, less cost to sell. Depreciation and amortization for assets classified as held for sale are ceased.

Carrying Value of Asset Retirement Obligations

The Company is required to maintain a liability (and associated asset) for the expected value of future retirement obligations on their mines, in line with ASC 410, Asset Retirement and Environmental Obligations.

Reclamation of areas disturbed by mining operations must be performed by us in accordance with approved reclamation plans and in compliance with state and federal laws in the states of West Virginia and Virginia in the U.S., and Queensland in Australia. For areas disturbed, a significant amount of the reclamation will take place in the future, when operations cease. There were no assets that were legally restricted for purposes of settling asset retirement obligations as of December 31, 2021. In addition, state agencies monitor compliance with the mine plans, including reclamation.

We record the fair value of additions to our asset retirement obligations using the present value of projected future cash flows discounted using a credit-adjusted risk-free rate, with an equivalent amount recorded as a long-lived asset. An accretion cost is recorded each period and the capitalized cost is depreciated over the useful life of the related asset. As reclamation work is performed or liabilities otherwise settled, the recorded amount of the liability is reduced.

Coronado Global Resources Inc. Form 10-K December 31, 2021 118


Table of Contents

 

A review of restoration and decommissioning provisions is carried out annually on a mine-by-mine basis, and adjustments made to reflect any changes in estimates, if necessary. On an interim basis, we may update the liability based on significant changes to the life of mine or significant increases in disturbances during the period.

Expected Credit Losses

For trade and related party receivables carried at amortized cost, we determine expected credit losses, or ECL, on a forward-looking basis. The amount of ECL is updated at each reporting date to reflect changes in credit risk since initial recognition of the respective financial instrument. We recognize the lifetime ECL. ECL is estimated based on our historic credit loss experience, adjusted for factors that are specific to the financial asset, general economic conditions, financial asset type, term and an assessment of both the current as well as forecast conditions, including expected timing of collection, at the reporting date, modified for credit enhancements such as letters of credit obtained. To measure ECL, trade and related party receivables have been grouped based on shared credit risk characteristics and the days past due.

We consider an event of default has occurred when a financial asset is significantly past due or other factors indicate that the debtor is unlikely to pay amounts owed to us. A financial asset is credit impaired when there is evidence that the counterparty is in significant financial difficulty or a breach of contract, such as default or past due event has occurred. We write off a financial asset when there is information indicating there is no realistic prospect of recovery of the asset from the counterparty. The amount of the impairment loss is recognized in the consolidated statement of operations and other comprehensive income within “Decrease (increase) in provision for discounting and credit losses”. Subsequent recoveries of amounts previously written off are credit against “Decrease (increase) provision for discounting and credit losses” in the consolidated statement of operations and other comprehensive income.

Recoverable Coal Reserves

There are numerous uncertainties inherent in estimating quantities and values of economically recoverable coal reserves, including many factors beyond our control. As a result, estimates of economically recoverable coal reserves are by their nature uncertain. Information about our reserves consists of estimates based on engineering, economic and geological data assembled and analyzed by our staff and third-party qualified persons. Our reserves are periodically reviewed by an independent third party consultant. Some of the factors and assumptions which impact economically recoverable reserve estimates include:

•geological settings;

•historical production from the area compared with production from other producing areas;

•the assumed effects of regulations and taxes by governmental agencies;

•assumptions governing future prices; and

•future operating costs.

Each of these factors may in fact vary considerably from the assumptions used in estimating reserves. For these reasons, estimates of the economically recoverable quantities of coal attributable to a particular group of properties, and classifications of these reserves based on risk of recovery and estimates of future net cash flows, may vary substantially. Actual production, revenues and expenditures with respect to our reserves will likely vary from estimates, and these variances may be material. See Item 1A. “Risk Factors—We rely on estimates of our recoverable reserves, which is complex due to geological characteristics of the properties and the number of assumptions made” and Item 2. “Properties” for discussions of the uncertainties in estimating our proven and probable coal reserves.

Income Taxes

We are required to estimate the amount of tax payable or refundable for the current year and the deferred income tax liabilities and assets for the future tax consequences of events that have been reflected in our financial statements or tax returns for each taxing jurisdiction in which we operate. This process requires our management to make judgments regarding the timing and probability of the ultimate tax impact of the various agreements and transactions that we enter into. Based on these judgments we may record tax reserves or adjustments to valuation allowances on deferred tax assets to reflect the expected realizability of future tax benefits. Actual income taxes could vary from these estimates due to future changes in income tax law, significant changes in the jurisdictions in which we operate, our inability to generate sufficient future taxable income or unpredicted

Coronado Global Resources Inc. Form 10-K December 31, 2021 119


Table of Contents

 

results from the final determination of each year’s liability by taxing authorities. These changes could have a significant impact on our financial position.

Newly Adopted Accounting Standards and Accounting Standards Not Yet Implemented

See Note 2. “Summary of Significant Accounting Policies” to the accompanying audited consolidated financial statements for a discussion of newly adopted accounting standards and accounting standards not yet implemented.

Coronado Global Resources Inc. Form 10-K December 31, 2021 120


Table of Contents

 

ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

Our activities expose us to a variety of financial risks, such as commodity price risk, interest rate risk, foreign currency risk, liquidity risk and credit risk. The overall risk management objective is to minimize potential adverse effects on our financial performance from those risks which are not coal price related.

We manage financial risk through policies and procedures approved by our Board of Directors. These specify the responsibility of the Board of Directors and management with regard to the management of financial risk. Financial risks are managed centrally by our finance team under the direction of the Group Chief Financial Officer. The finance team manages risk exposures primarily through delegated authority limits approved by the Board of Directors. The finance team regularly monitors our exposure to these financial risks and reports to management and the Board of Directors on a regular basis. Policies are reviewed at least annually and amended where appropriate.

We may use derivative financial instruments such as forward fixed price commodity contracts, interest rate swaps and foreign exchange rate contracts to hedge certain risk exposures. Derivatives for speculative purposes is strictly prohibited by the Treasury Risk Management Policy approved by our Board of Directors. We use different methods to measure the extent to which we are exposed to various financial risks. These methods include sensitivity analysis in the case of interest rate, foreign exchange and other price risks and aging analysis for credit risk.

Commodity Price Risk

Coal Price Risk

We are exposed to domestic and global coal prices. Our principal philosophy is that our investors would not consider hedging of coal prices to be in the long-term interest of our stockholders. Therefore, any potential hedging of coal prices through long-term fixed price contracts is subject to the approval of our Board of Directors and would only be adopted in exceptional circumstances.

Access to international markets may be subject to ongoing interruptions and trade barriers due to policies and tariffs of individual countries. For example, the imposition of restrictions by China on Australian coal imports into the country, which may have a negative impact on our profitability. An inability for metallurgical coal suppliers to access international markets, including China, would likely result in an oversupply of Met coal and may result in a decrease in prices and or the curtailment of production.

We manage our commodity price risk for our non-trading, thermal coal sales through the use of long-term coal supply agreements in our U.S. Operations. In Australia, thermal coal is sold to Stanwell on a supply contract. See Part I, Item 1A. “Risk Factors—Risks related to the Supply Deed with Stanwell may adversely affect our financial condition and results of operations.”

Sales commitments in the Met coal market are typically not long-term in nature, and we are therefore subject to fluctuations in market pricing. Certain coal sales in our Australian Operations are provisionally priced initially. Provisionally priced sales are those for which price finalization, referenced to the relevant index, is outstanding at the reporting date. The final sales price is determined within 7 to 90 days after delivery to the customer. At December 31, 2021, there were $46.1 million of outstanding provisionally priced sales. If prices were to decrease 10%, provisionally priced sales would decrease by $4.6 million. See Part I, Item 1A. “Risk Factors—Our profitability depends upon the prices we receive for our coal. Prices for coal are volatile and can fluctuate widely based upon a number of factors beyond our control.”

Diesel Fuel

We may be exposed to price risk in relation to other commodities from time to time arising from raw materials used in our operations (such as gas or diesel). These commodities may be hedged through financial instruments if the exposure is considered material and where the exposure cannot be mitigated through fixed price supply agreements.

The fuel required for our operations in fiscal year 2022 will be purchased under fixed-price contracts or on a spot basis.

Coronado Global Resources Inc. Form 10-K December 31, 2021 121


Table of Contents

 

Interest Rate Risk

Interest rate risk is the risk that a change in interest rates on our borrowing facilities will have an adverse impact on financial performance, investment decisions and stockholder return. Our objectives in managing our exposure to interest rates include minimizing interest costs in the long term, providing a reliable estimate of interest costs for the annual work program and budget and ensuring that changes in interest rates will not have a material impact on our financial performance.

As of December 31, 2021, we had $337.7 million of fixed-rate borrowings and Notes and no variable-rate borrowings outstanding.

We currently do not hedge against interest rate fluctuations.

Foreign Exchange Risk

A significant portion of our sales are denominated in US$. Foreign exchange risk is the risk that our earnings or cash flows are adversely impacted by movements in exchange rates of currencies that are not in US$.

Our main exposure is to the A$-US$ exchange rate through our Australian Operations, which have predominantly A$ denominated costs. Greater than 75% of expenses incurred at Curragh are denominated in A$. Approximately 25% of Curragh’s purchases (including fuel, some port handling charges, demurrage, purchased coal and some insurance premiums) are made with reference to US$, which provides a natural hedge against foreign exchange movements on these purchases. A 10% increase in the A$ to US$ exchange rate would increase reported total costs and expenses by approximately $91.6 million for the year ended December 31, 2021.

Under normal market conditions, we generally do not consider it necessary to hedge our exposure to this foreign exchange risk. However, there may be specific commercial circumstances, such as the hedging of significant capital expenditure, acquisitions, disposals and other financial transactions, where we may deem foreign exchange hedging as appropriate and where a US$ contract cannot be negotiated directly with suppliers and other third parties.

For our Australian Operations, we translate all monetary assets and liabilities at the period-end exchange rate, all non-monetary assets and liabilities at historical rates and revenue and expenses at the average exchange rates in effect during the periods. The net effect of these translation adjustments is shown in the accompanying consolidated financial statements within components of net income.

We currently do not hedge our non-US$ exposures against exchange rate fluctuations.

Credit Risk

Credit risk is the risk of sustaining a financial loss as a result of a counterparty not meeting its obligations under a financial instrument or customer contract.

We are exposed to credit risk when we have financial derivatives, cash deposits, lines of credit, letters of credit or bank guarantees in place with financial institutions. To mitigate against credit risk from financial counterparties, we have minimum credit rating requirements with financial institutions where we transact.

We are also exposed to counterparty credit risk arising from our operating activities, primarily from trade receivables. Customers who wish to trade on credit terms are subject to credit verification procedures, including an assessment of their independent credit rating, financial position, past experience and industry reputation. We monitor the financial performance of counterparties on a routine basis to ensure credit thresholds are achieved. Where required, we will request additional credit support, such as letters of credit, to mitigate against credit risk. Credit risk is monitored regularly, and performance reports are provided to our management and Board of Directors.

Coronado Global Resources Inc. Form 10-K December 31, 2021 122


Table of Contents

 

ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA

 

TABLE OF CONTENTS

 

 

 

Page Number

 

 

 

 

 

Consolidated Balance Sheets

 

124

 

Consolidated Statements of Operations and Comprehensive Income

 

125

 

Consolidated Statements of Stockholders’ Equity

 

126

 

Consolidated Statements of Cash Flows

 

127

 

Notes to Consolidated Financial Statements

 

128

 

Report of Independent Registered Public Accounting Firm (PCAOB ID: 01435)

 

167

 

Report of Former Independent Registered Public Accounting Firm

 

169

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 123


Table of Contents

 

IConsolidated Balance Sheets

(In US$ thousands, except share data)

 

Assets

 

Note

 

December 31, 2021

 

December 31, 2020

Current assets:

 

 

 

 

 

 

 

 

Cash and restricted cash

 

 

 

$

437,931

 

$

45,736

Trade receivables, net

 

 

 

 

271,923

 

 

175,206

Related party trade receivables, net

 

8

 

 

—

 

 

81,970

Income tax receivable

 

24

 

 

—

 

 

20,325

Inventories

 

10

 

 

118,922

 

 

110,135

Other current assets

 

13

 

 

47,647

 

 

44,006

Assets held for sale

 

4

 

 

27,023

 

 

52,524

Total current assets

 

 

 

 

903,446

 

 

529,902

Non-current assets:

 

 

 

 

 

 

 

 

Property, plant and equipment, net

 

11

 

 

1,397,363

 

 

1,521,508

Right of use asset – operating leases, net

 

15

 

 

13,656

 

 

19,498

Goodwill

 

12

 

 

28,008

 

 

28,008

Intangible assets, net

 

12

 

 

3,514

 

 

4,217

Restricted deposits

 

28

 

 

80,981

 

 

8,425

Deferred income tax assets

 

24

 

 

14,716

 

 

24,654

Other non-current assets

 

13

 

 

19,728

 

 

12,264

Total assets

 

 

 

$

2,461,412

 

$

2,148,476

Liabilities and Stockholders’ Equity

 

 

 

 

 

 

 

 

Current liabilities:

 

 

 

 

 

 

 

 

Accounts payable

 

 

 

$

97,514

 

$

74,651

Accrued expenses and other current liabilities

 

14

 

 

270,942

 

 

234,526

Income tax payable

 

24

 

 

25,612

 

 

—

Asset retirement obligations

 

16

 

 

9,414

 

 

6,012

Contract obligations

 

19

 

 

39,961

 

 

40,295

Lease liabilities

 

15

 

 

8,452

 

 

8,414

Other current financial liabilities

 

18

 

 

8,508

 

 

7,129

Liabilities held for sale

 

4

 

 

12,113

 

 

16,719

Total current liabilities

 

 

 

 

472,516

 

 

387,746

Non-current liabilities:

 

 

 

 

 

 

 

 

Asset retirement obligations

 

16

 

 

110,863

 

 

116,132

Contract obligations

 

19

 

 

141,188

 

 

185,823

Deferred consideration liability

 

20

 

 

230,492

 

 

216,513

Interest bearing liabilities

 

17

 

 

300,169

 

 

327,625

Other financial liabilities

 

18

 

 

13,822

 

 

—

Lease liabilities

 

15

 

 

12,894

 

 

20,582

Deferred income tax liabilities

 

24

 

 

75,750

 

 

64,366

Other non-current liabilities

 

 

 

 

26,216

 

 

22,826

Total liabilities

 

 

 

$

1,383,910

 

$

1,341,613

Common stock $0.01 par value; 1,000,000,000 shares authorized, 167,645,373 shares issued and outstanding as of December 31, 2021 and 138,387,890 shares issued and outstanding as of December 31, 2020

 

 

 

 

1,677

 

 

1,384

Series A Preferred stock $0.01 par value; 100,000,000 shares authorized, 1 Share issued and outstanding as of December 31, 2021 and December 31, 2020

 

 

 

 

—

 

 

—

Additional paid-in capital

 

 

 

 

1,089,547

 

 

993,052

Accumulated other comprehensive losses

 

26

 

 

(44,228)

 

 

(28,806)

Retained earnings (accumulated losses)

 

 

 

 

30,506

 

 

(158,919)

Coronado Global Resources Inc. stockholders’ equity

 

 

 

 

1,077,502

 

 

806,711

Noncontrolling interest

 

 

 

 

—

 

 

152

Total stockholders’ equity

 

 

 

 

1,077,502

 

 

806,863

Total liabilities and stockholders’ equity

 

 

 

$

2,461,412

 

$

2,148,476

 

 

 

 

 

 

 

 

 

See accompanying notes to consolidated financial statements.

Coronado Global Resources Inc. Form 10-K December 31, 2021 124


Table of Contents

 

Consolidated Statements of Operations and Comprehensive Income
(In US$ thousands, except share data)

 

 

 

 

 

Year ended December 31,

 

 

Note

 

2021

 

2020

 

2019

Revenues:

 

 

 

 

 

 

 

 

 

 

 

Coal revenues

 

3

 

$

2,010,996

 

$

1,289,010

 

$

1,705,442

Coal revenues from related parties

 

3, 29

 

 

97,335

 

 

134,589

 

 

468,897

Other revenues

 

3

 

 

40,140

 

 

38,663

 

 

41,409

Total revenues

 

 

 

 

2,148,471

 

 

1,462,262

 

 

2,215,748

Costs and expenses:

 

 

 

 

 

 

 

 

 

 

 

Cost of coal revenues (exclusive of items shown separately below)

 

 

 

 

1,195,250

 

 

1,014,879

 

 

1,047,359

Depreciation, depletion and amortization

 

 

 

 

177,875

 

 

191,189

 

 

176,461

Freight expenses

 

 

 

 

241,862

 

 

185,863

 

 

166,729

Stanwell rebate

 

 

 

 

55,403

 

 

103,039

 

 

175,318

Other royalties

 

 

 

 

142,751

 

 

84,891

 

 

157,016

Selling, general, and administrative expenses

 

 

 

 

30,666

 

 

30,352

 

 

36,062

Restructuring costs

 

 

 

 

2,300

 

 

—

 

 

—

Total costs and expenses

 

 

 

 

1,846,107

 

 

1,610,213

 

 

1,758,945

Other income (expenses):

 

 

 

 

 

 

 

 

 

 

 

Interest expense, net

 

 

 

 

(68,062)

 

 

(50,585)

 

 

(39,294)

Loss on debt extinguishment

 

 

 

 

(8,477)

 

 

—

 

 

—

Impairment of assets

 

5

 

 

—

 

 

(78,111)

 

 

—

Decrease (increase) in provision for discounting and credit losses

 

9

 

 

8,042

 

 

(9,298)

 

 

—

Gain on disposal of asset held for sale

 

4

 

 

14,845

 

 

—

 

 

—

Other, net

 

6

 

 

(6,187)

 

 

(608)

 

 

2,649

Total other expense, net

 

 

 

 

(59,839)

 

 

(138,602)

 

 

(36,645)

Income (loss) before tax

 

 

 

 

242,525

 

 

(286,553)

 

 

420,158

Income tax (expense) benefit

 

24

 

 

(53,102)

 

 

60,016

 

 

(114,681)

Net income (loss)

 

 

 

 

189,423

 

 

(226,537)

 

 

305,477

Less: Net loss attributable to noncontrolling interest

 

 

 

 

(2)

 

 

(69)

 

 

(61)

Net income (loss) attributable to Coronado Global Resources Inc.

 

 

 

$

189,425

 

$

(226,468)

 

$

305,538

Other comprehensive income, net of income taxes:

 

 

 

 

 

 

 

 

 

 

 

Foreign currency translation adjustment

 

26

 

 

(17,451)

 

 

21,488

 

 

(2,438)

Net (loss) gain on cash flow hedges, net of tax

 

26

 

 

2,029

 

 

(5,088)

 

 

6,841

Total other comprehensive income (loss)

 

 

 

 

(15,422)

 

 

16,400

 

 

4,403

Total comprehensive income (loss)

 

 

 

 

174,001

 

 

(210,137)

 

 

309,880

Less: Net loss attributable to noncontrolling interest

 

 

 

 

(2)

 

 

(69)

 

 

(61)

Total comprehensive income (loss) attributable to Coronado Global Resources Inc.

 

 

 

$

174,003

 

$

(210,068)

 

$

309,941

 

 

 

 

 

 

 

 

 

 

 

 

Earnings (loss) per share of common stock

 

 

 

 

 

 

 

 

 

 

 

Basic

 

7

 

 

1.21

 

 

(2.04)

 

 

3.16

Diluted

 

7

 

 

1.21

 

 

(2.04)

 

 

3.16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

See accompanying notes to consolidated financial statements.

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 125


Table of Contents

 

Consolidated Statements of Stockholders’ Equity

(In US$ thousands, except share data)

 

 

 

 

 

Common stock

 

Preferred stock

 

 

Additional paid in capital

 

 

Accumulated other comprehensive losses

 

 

Retained earnings (Accumulated losses)

 

 

Noncontrolling interest

 

 

Total stockholders equity

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Shares

 

 

Amount

 

Series A

 

 

Amount

 

 

 

 

 

 

 

 

 

 

Balance December 31, 2018

 

 

 

 

96,651,692

 

$

967

 

1

 

$

—

 

$

1,107,948

 

$

(49,609)

 

$

194,220

 

$

282

 

$

1,253,808

Net income (loss)

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

—

 

 

—

 

 

305,538

 

 

(61)

 

 

305,477

Other comprehensive loss (net of $2,932 deferred income tax)

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

—

 

 

4,403

 

 

—

 

 

—

 

 

4,403

Total comprehensive income (loss)

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

—

 

 

4,403

 

 

305,538

 

 

(61)

 

 

309,880

Share based compensation for equity classified awards

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

319

 

 

—

 

 

—

 

 

—

 

 

319

Dividends paid

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

—

 

 

—

 

 

(408,046)

 

 

—

 

 

(408,046)

Return of capital

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

(288,020)

 

 

—

 

 

—

 

 

—

 

 

(288,020)

Balance December 31, 2019

 

 

 

 

96,651,692

 

$

967

 

1

 

$

—

 

$

820,247

 

$

(45,206)

 

$

91,712

 

$

221

 

$

867,941

Net loss

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

—

 

 

—

 

 

(226,468)

 

 

(69)

 

 

(226,537)

Other comprehensive income (net of $2,108 deferred income tax)

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

—

 

 

16,400

 

 

—

 

 

—

 

 

16,400

Total comprehensive income (loss)

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

—

 

 

16,400

 

 

(226,468)

 

 

(69)

 

 

(210,137)

Issuance of common stock, net

 

 

 

 

41,736,198

 

 

417

 

—

 

 

—

 

 

171,168

 

 

—

 

 

—

 

 

—

 

 

171,585

Share-based compensation for equity classified awards

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

1,637

 

 

—

 

 

—

 

 

—

 

 

1,637

Dividends paid

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

—

 

 

—

 

 

(24,163)

 

 

—

 

 

(24,163)

Balance December 31, 2020

 

 

 

 

138,387,890

 

$

1,384

 

1

 

$

—

 

$

993,052

 

$

(28,806)

 

$

(158,919)

 

$

152

 

$

806,863

Net income (loss)

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

—

 

 

—

 

 

189,425

 

 

(2)

 

 

189,423

Other comprehensive loss (net of $870 deferred income tax)

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

—

 

 

(15,422)

 

 

—

 

 

—

 

 

(15,422)

Total comprehensive (loss) income

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

—

 

 

(15,422)

 

 

189,425

 

 

(2)

 

 

174,001

Issuance of common stock, net

 

 

 

 

29,257,483

 

 

293

 

—

 

 

—

 

 

97,448

 

 

—

 

 

—

 

 

—

 

 

97,741

Share-based compensation for equity classified awards

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

(250)

 

 

—

 

 

—

 

 

—

 

 

(250)

Acquisition of noncontrolling interest

 

 

 

 

—

 

 

—

 

—

 

 

—

 

 

(703)

 

 

—

 

 

—

 

 

(150)

 

 

(853)

Balance December 31, 2021

 

 

 

 

167,645,373

 

$

1,677

 

1

 

$

—

 

$

1,089,547

 

$

(44,228)

 

$

30,506

 

$

—

 

$

1,077,502

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

See accompanying notes to consolidated financial statements

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 126


Table of Contents

 

Consolidated Statements of Cash Flows
(In US$ thousands)

 

 

Year Ended December 31,

 

 

2021

 

2020

 

2019

Cash flows from operating activities:

 

 

 

 

 

 

 

 

 

Net income (loss)

 

$

189,423

 

$

(226,537)

 

$

305,477

Adjustments to reconcile net income to cash and restricted cash provided by operating activities:

 

 

 

 

 

 

 

 

 

Depreciation, depletion and amortization

 

 

175,814

 

 

197,162

 

 

176,461

Impairment of Assets

 

 

—

 

 

78,111

 

 

—

Amortization of right of use asset - operating leases

 

 

8,899

 

 

13,285

 

 

24,403

Amortization of deferred financing costs

 

 

3,133

 

 

5,546

 

 

4,497

Non-cash interest expense

 

 

29,120

 

 

22,410

 

 

19,885

Amortization of contract obligations

 

 

(33,967)

 

 

(33,172)

 

 

(34,794)

Loss (gain) on disposal of property, plant and equipment

 

 

415

 

 

131

 

 

(1,238)

Decrease in contingent royalty consideration

 

 

—

 

 

(1,543)

 

 

(13,646)

Gain on operating lease derecognition

 

 

—

 

 

(1,184)

 

 

—

Equity-based compensation expense

 

 

(250)

 

 

1,637

 

 

321

Loss on debt extinguishment

 

 

8,477

 

 

—

 

 

—

Deferred income taxes

 

 

24,417

 

 

(11,247)

 

 

14,803

Reclamation of asset retirement obligations

 

 

(4,273)

 

 

(2,859)

 

 

(3,456)

Change in estimate of asset retirement obligation

 

 

2,061

 

 

(5,973)

 

 

—

Gain on disposal of asset held for sale

 

 

(14,845)

 

 

—

 

 

—

(Decrease) increase in provision for discounting and credit losses

 

 

(8,042)

 

 

9,298

 

 

—

Changes in operating assets and liabilities:

 

 

 

 

 

 

 

 

 

Accounts receivable - including related party receivables, net

 

 

(33,545)

 

 

(38,025)

 

 

20,205

Inventories

 

 

(9,637)

 

 

53,652

 

 

(67,388)

Other current assets

 

 

24,573

 

 

(1,921)

 

 

(5,062)

Accounts payable

 

 

24,166

 

 

6,833

 

 

21,351

Accrued expenses and other current liabilities

 

 

64,285

 

 

(27,829)

 

 

(4,336)

Operating lease liabilities

 

 

(10,986)

 

 

(15,329)

 

 

(25,877)

Change in other liabilities

 

 

2,776

 

 

(25,446)

 

 

45,820

Net cash provided by (used in) operating activities

 

 

442,014

 

 

(3,000)

 

 

477,426

Cash flows from investing activities:

 

 

 

 

 

 

 

 

 

Capital expenditures

 

 

(89,661)

 

 

(117,856)

 

 

(183,283)

Proceeds from the disposal of property, plant, and equipment

 

 

1,594

 

 

—

 

 

145

Proceeds from disposal of assets held for sale

 

 

27,451

 

 

—

 

 

—

Purchase of restricted deposits

 

 

(103,997)

 

 

(2,302)

 

 

(1,074)

Redemption of restricted deposits

 

 

30,281

 

 

6,030

 

 

482

Net cash used in investing activities

 

 

(134,332)

 

 

(114,128)

 

 

(183,730)

Cash flows from financing activities:

 

 

 

 

 

 

 

 

 

Proceeds from interest bearing liabilities and other financial liabilities

 

 

411,524

 

 

216,953

 

 

474,223

Debt issuance costs and other financing costs

 

 

(15,263)

 

 

(2,955)

 

 

(4,293)

Principal payments on interest bearing liabilities and other financial liabilities

 

 

(412,046)

 

 

(221,414)

 

 

(148,583)

Call premiums paid on early redemption of debt

 

 

(1,050)

 

 

—

 

 

—

Principal payments on finance lease obligations

 

 

(70)

 

 

(2,481)

 

 

(1,308)

Payment of contingent purchase consideration

 

 

—

 

 

—

 

 

(15,002)

Dividends paid

 

 

—

 

 

(24,162)

 

 

(408,046)

Shareholders’ distributions

 

 

—

 

 

—

 

 

(288,020)

Proceeds from stock issuance, net

 

 

97,741

 

 

171,585

 

 

—

Net cash provided by (used in) financing activities

 

 

80,836

 

 

137,526

 

 

(391,029)

Net increase (decrease) in cash and restricted cash

 

 

388,518

 

 

20,398

 

 

(97,333)

Effect of exchange rate changes on cash and restricted cash

 

 

3,677

 

 

(1,215)

 

 

(995)

Cash and restricted cash at beginning of period

 

 

45,736

 

 

26,553

 

 

124,881

Cash and restricted cash at end of period

 

$

437,931

 

$

45,736

 

$

26,553

Supplemental disclosure of cash flow information:

 

 

 

 

 

 

 

 

 

Cash payments for interest

 

$

33,462

 

$

23,538

 

$

5,235

Cash (refund) paid for taxes

 

$

(16,582)

 

$

1,955

 

$

67,863

 

 

 

 

 

 

 

 

 

 

See accompanying notes to consolidated financial statements

Coronado Global Resources Inc. Form 10-K December 31, 2021 127


Table of Contents

 

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

1. Description of Business, Basis of Presentation

(a) Nature of operations

Coronado Global Resources Inc. (together with its subsidiaries, the “Company” or “Coronado”) is a global producer, marketer, and exporter of a full range of metallurgical coals, an essential element in the production of steel. The Company has a portfolio of operating mines and development projects in Queensland, Australia and in the states of Pennsylvania, Virginia and West Virginia in the United States, or U.S. For details of the Company’s capital structure, refer to Note 7 “Capital Structure” for further information .

 

(b) Basis of Presentation

The consolidated financial statements have been prepared in accordance with requirements of the U.S. Generally Accepted Accounting Principles (“U.S. GAAP”) and are presented in US dollars, unless otherwise stated.

The consolidated financial statements include the accounts of the Company and its affiliates. The Company, or Coronado, are used interchangeably to refer to Coronado Global Resources Inc. or Coronado Global Resources Inc. and its subsidiaries, as appropriate to the context. Interests in subsidiaries controlled by the Company are consolidated with any outside stockholder interests reflected as noncontrolling interests. All intercompany balances and transactions have been eliminated on consolidation.

The Company has amended the presentation of its Consolidated Statement of Operations and Comprehensive Income to eliminate certain subtotals, which are not required under U.S. GAAP and to better align the Company’s presentation to its peers. The removal of these subtotals had no effect on the reported results of operations or any required U.S. GAAP subtotals or totals.

(c) Certain Significant Risks and Uncertainties

External factors, including general economic conditions, international events and circumstances, competitor actions, governmental actions and regulations are beyond the Company’s control and can cause fluctuations in demand for coal and volatility in the price of commodities. This in turn may adversely impact on the Company’s future operating results, purchase or investment opportunities in the coal mining industry.

Concentration of customers

The Company has a formal written credit policy that establishes procedures to determine creditworthiness and credit limits for trade customers and counterparties in the over-the-counter coal market. Generally, credit is extended based on an evaluation of the customer’s financial condition. Collateral is not generally required, unless credit cannot be established.

Payments from customers are generally due 30 days after invoicing. Invoicing usually occurs after shipment or delivery of goods. The timing between the recognition of revenue and receipt of payment is not significant.

The Company had certain customers whose accounts receivable balances individually represented 10% or more of the Company’s total accounts receivable, or whose revenue individually represented 10% or more of the Company’s total revenue.

For the year ended December 31, 2021, $971.6 million, or 46.3% of total revenues, were attributable to five customers. In comparison, for the year ended December 31, 2020, $671.9 million, or 47.1% of total revenues were attributable to five customers and for the year ended December 31, 2019, $1,198.2 million, or 55.0% of total revenues were attributable to five customers. As of December 31, 2021, the Company had four customers that accounted for $149.2 million, or 54.7%, of accounts receivable. As of December 31, 2020, the Company had four customers that accounted for $157.6 million, or 61.5%, of accounts receivable.

Coronado Global Resources Inc. Form 10-K December 31, 2021 128


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

The following table summarizes any customer whose revenue individually represented 10% or more of the Company’s total revenue in the years ended December 31, 2021, 2020 and 2019.

 

 

 

Year Ended December 31,

 

 

2021

 

2020

 

2019

Xcoal

 

11%

 

9%

 

22%

Tata Steel

 

17%

 

17%

 

16%

The following table presents revenues as a percent of total revenue from external customers by geographic region:

 

 

Year Ended December 31,

 

 

2021

 

2020

 

2019

North America

 

7%

 

13%

 

15%

Australia

 

6%

 

6%

 

5%

Asia

 

48%

 

50%

 

52%

Europe

 

12%

 

13%

 

6%

South America

 

6%

 

4%

 

—

Brokered sales

 

21%

 

14%

 

22%

Total

 

100%

 

100%

 

100%

 

The Company uses shipping destination as the basis for attributing revenue to individual countries. Because title may transfer on brokered transactions at a point that does not reflect the end usage point, they are reflected as exports, and attributed to an end delivery point if that knowledge is known to the Company.

Concentration of labor

Out of the Company’s total employees, 12% are subject to the Curragh Mine Operations Enterprise Bargaining Agreement 2019. This agreement covers work carried out by permanent, full-time, temporary, and casual coal mining employees engaged by Curragh to fulfil production, maintenance and processing activities. Other than the Curragh Mine Operations Enterprise Bargaining Agreement 2019, there are no other collective bargaining agreements or union contracts covering employees of the Company.

Transportation

The Company depends upon port and rail transportation systems to deliver coal to its customers. Disruption of these transportation services due to weather-related problems, mechanical difficulties, strikes, lockouts, bottlenecks, and other events could temporarily impair the Company’s ability to supply coal to its customers. In the past, disruptions in these services have resulted in delayed shipments and production interruptions.

2. Summary of Significant Accounting Policies

(a)Newly Adopted Accounting Standards

“Income Taxes - Simplifying the Accounting for Income Taxes” - In December 2019, the Financial Accounting Standards Board issued Accounting Standards Update, or ASU, 2019-12, which simplified various aspects related to accounting for income taxes. ASU 2019-12 removed certain exceptions to the general principles in Accounting Standards Codification, or ASC, Topic 740 –Income Taxes, and clarified and amended existing guidance to improve consistent application.

 

The adoption of ASU 2019-12 on January 1, 2021 did not have material impact on the Company’s consolidated financial statements.

 

(b)Accounting Standards Not Yet Implemented

To date, there have been no recent accounting pronouncements not yet effective that have significance, or potential significance, to the Company’s Consolidated Financial Statements.

Coronado Global Resources Inc. Form 10-K December 31, 2021 129


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

 

(c)Use of Estimates

The preparation of consolidated financial statements in conformity with US GAAP requires management to make certain judgements, estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the consolidated financial statements and the reported amounts of revenues and expenses during the reporting periods. Actual results could differ materially from those estimates. Significant items subject to such estimates and assumptions include asset retirement obligations; useful lives for depreciation, depletion and amortization; deferred income tax assets and liabilities; values of coal properties; fair value of assets held for sale, workers’ compensation liability and other contingencies.

(d)Foreign Currency

Financial statements of foreign operations

The reporting currency of the Company is the US Dollar (“US$”).

Functional currency is determined by the primary economic environment in which an entity operates. The functional currency of the Company and its subsidiaries is the US$, with the exception of two foreign operating subsidiaries, Curragh and its immediate parent CAH, whose functional currency is the Australian dollar (“A$”) since Curragh’s predominant sources of operating expenses are denominated in that currency.

Assets and liabilities are translated at the year-end exchange rate and items in the statement of operations are translated at average rates with gains and losses from translation recorded in other comprehensive losses.

Foreign Currency Transactions

Monetary assets and liabilities are remeasured at year-end exchange rates while non-monetary items are remeasured at historical rates.

Gains and losses from foreign currency remeasurement related to Curragh’s US dollar receivables are included in coal revenues. All other gains and losses from foreign currency remeasurement and foreign currency forward contracts are included in “Other, net”, with exception of foreign currency gains or losses on long-term intercompany loan balances which are classified within “Accumulated other comprehensive losses”. The total aggregate impact of foreign currency transaction gains or losses on the Consolidated Statements of Operations and Comprehensive Income was a net gain of $1.7 million, net loss of $3.2 million and net loss of $1.9 million for the years ended December 31, 2021, 2020 and 2019, respectively. The total impact of foreign currency transactions related to US dollar coal sales in Australia (included in the total above) was a net gain of $8.7 million, a net loss of $4.0 million and a net loss of $2.9 million for the years ended December 31, 2021, 2020 and 2019, respectively.

(e)Cash and Cash Equivalents and Restricted Cash

Cash and cash equivalents include cash at bank and short-term highly liquid investments with an original maturity date of three months or less. At December 31, 2021 and 2020, the Company had no cash equivalents.

“Cash and Restricted Cash”, as disclosed in the accompanying Consolidated Balance Sheets includes $0.3 million of restricted cash at December 31, 2021 and $0.3 million at 2020.

(f)Trade and Related Party Accounts Receivables

The Company extends trade credit to its customers in the ordinary course of business. Trade receivables and related party receivables are recorded initially at fair value and subsequently at amortized cost, less any Expected Credit Losses, or ECL. Trade receivables from provisionally priced sales are carried at fair value to profit or loss.

For trade and related party receivables carried at amortized cost, the Company determines ECL on a forward-looking basis. The amount of ECL is updated at each reporting date to reflect changes in credit risk since initial recognition of the respective financial instrument. The Company recognizes the lifetime ECL. The ECL is estimated based on the Company’s historic credit loss experience, adjusted for factors that are specific to the financial asset, general economic conditions, financial asset type, term and an assessment of both the current as well as forecast conditions, including expected timing of collection, at the reporting date, modified for credit enhancements such as letters of credit obtained. To measure ECL, trade receivables have been grouped based on shared credit risk characteristics and the days past due.

Coronado Global Resources Inc. Form 10-K December 31, 2021 130


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

The amount of credit loss is recognized in the Consolidated Statement of Operations and Other Comprehensive Income within “Provision for discounting and credit losses”. The Company writes off a financial asset when there is information indicating there is no realistic prospect of recovery of the asset from the counterparty. Subsequent recoveries of amounts previously written off are credited against “Provision for discounting and credit losses” in the Consolidated Statement of Operations and Other Comprehensive Income.

Factoring

The Company has agreements with financial institutions to sell selected trade receivables on a recurring, non-recourse basis. Under these agreements, trade receivables sold do not allow for recourse for any credit risk related to the Company’s customers if such receivables are not collected by the third-party financial institutions.

The Company derecognizes the trade receivables sold under the factoring arrangement and the difference between proceeds received and carrying amount of the trade receivables sold is recognized within “Interest, net” in its Consolidated Statements of Operations and Comprehensive Income.

(g)Inventories

Coal is recorded as inventory at the point in time the coal is extracted from the mine. Raw coal represents coal stockpiles that may be sold in current condition or may be further processed prior to shipment to a customer. Saleable coal represents coal stockpiles which require no further processing prior to shipment to a customer.

Coal inventories are stated at the lower of average cost and net realizable value. The cost of coal inventories is determined based on an average cost of production, which includes all costs incurred to extract, transport and process the coal. Net realizable value considers the estimated sales price of the particular coal product, less applicable selling costs, and, in the case of raw coal, estimated remaining processing costs.

Supplies inventory is comprised of replacement parts for operational equipment and other miscellaneous materials and supplies required for mining which are stated at cost on the date of purchase. Supplies inventory is valued at the lower of average cost or net realizable value, less a reserve for obsolete or surplus items. This reserve incorporates several factors, such as anticipated usage, inventory turnover and inventory levels. It is not customary to sell these inventories; the Company plans to use them in mining operations as needed.

(h)Assets held for sale

Assets held for sale are measured at the lower of their carrying amount or fair value less costs to sell. See Note 4 “Assets Held for Sale” for further discussion.

(i)Property, Plant and Equipment, Impairment of Long-Lived Assets and Goodwill

Property, Plant, and Equipment

Costs for mine development incurred to expand capacity of operating mines or to develop new mines and certain mining equipment are capitalized and charged to operations on the hours of usage or units of production method over the estimated proven and probable reserve tons directly benefiting from the capital expenditures. Mine development costs include costs incurred for site preparation and development of the mines during the development stage. Capitalized costs related to internal-use software are amortized on a straight-line basis over the estimated useful lives of the assets.

Property, plant, and equipment are recorded at cost and include expenditures for improvements when they substantially increase the productive lives of existing assets. Depreciation is calculated using the straight-line method over the estimated useful lives of the depreciable assets of 3 to 10 years for machinery, mining equipment and transportation vehicles, 5 to 10 years for office equipment, and 10 to 20 years for plant, buildings and improvements.

Maintenance and repair costs are expensed to operations as incurred. When equipment is retired or disposed, the related cost and accumulated depreciation are removed from the respective accounts and any gain or loss on disposal is recognized in operations.

Coronado Global Resources Inc. Form 10-K December 31, 2021 131


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

Impairment of long-lived assets

Long-lived assets, such as property, plant, and equipment, and purchased intangible assets subject to amortization, are reviewed for impairment whenever events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. If circumstances require a long-lived asset or asset group be tested for possible impairment, the Company first compares undiscounted cash flows expected to be generated by that asset or asset group to its carrying amount. If the carrying amount of the long-lived asset or asset group is not recoverable on an undiscounted cash flow basis, an impairment is recognized to the extent that the carrying amount exceeds its fair value. Fair value is determined through various valuation techniques including discounted cash flow models, quoted market values and third-party independent appraisals, as considered necessary. Refer to Note 6 “Impairment of assets” for further disclosure.

Goodwill

Goodwill is an asset representing the future economic benefits arising from other assets acquired in a business combination that are not individually identified and separately recognized. In connection with the Buchanan acquisition on March 31, 2016, the Company recorded goodwill in the amount of $28.0 million. Goodwill is not amortized but is reviewed for impairment annually or when circumstances or other events indicate that impairment may have occurred. The Company follows the guidance in Accounting Standards Update 2017-04 “Intangibles – Goodwill and Other: Simplifying the Test for Goodwill Impairment” (ASU 2017-04). The Company makes a qualitative assessment of whether it is more likely than not that a reporting unit’s fair value is less than its carrying amount. Circumstances that are considered as part of the qualitative assessment and could trigger a quantitative impairment test include but are not limited to: a significant adverse change in the business climate; a significant adverse legal judgment; adverse cash flow trends; an adverse action or assessment by a government agency; unanticipated competition; and a significant restructuring charge within a reporting unit. If a quantitative assessment is determined to be necessary, the Company compares the fair value of a reporting unit with its carrying amount, including goodwill. If the carrying amount of a reporting unit exceeds its fair value, the Company recognizes an impairment charge for the amount by which the carrying amount exceeds its fair value to the extent of the amount of goodwill allocated to that reporting unit.

The Company defines reporting units at the mining asset level. For purposes of testing goodwill for impairment, goodwill has been allocated to the reporting units to the extent it relates to each reporting unit.

(j)Asset Retirement Obligations

The Company’s asset retirement obligation, or ARO, liabilities primarily consist of estimates of surface land reclamation and support facilities at both surface and underground mines in accordance with applicable reclamation laws and regulations in the U.S. and Australia as defined by each mining permit.

The Company estimates its ARO liabilities for final reclamation and mine closure based upon detailed engineering calculations of the amount and timing of the future cash spending for a third party to perform the required work. Spending estimates are escalated for inflation and then discounted at the credit-adjusted, risk-free rate. The Company records an ARO asset associated with the discounted liability for final reclamation and mine closure. The obligation and corresponding asset are recognized in the period in which the liability is incurred. The ARO asset is amortized on the units-of-production method over its expected life of the related asset and the ARO liability is accreted to the projected spending date. As changes in estimates occur (such as mine plan revisions, changes in estimated costs or changes in timing of the performance of reclamation activities), the revisions to the obligation and asset are recognized at the appropriate credit-adjusted, risk-free rate. The Company also recognizes an obligation for contemporaneous reclamation liabilities incurred as a result of surface mining. Contemporaneous reclamation consists primarily of grading, topsoil replacement and re-vegetation of backfilled pit areas. To settle the liability, the obligation is paid, and to the extent there is a difference between the liability and the amount of cash paid, a gain or loss upon settlement is recorded. The Company annually reviews its estimated future cash flows for its asset retirement obligations.

(k)Borrowing costs

Borrowing costs are recognized as an expense when they are incurred, except for interest charges attributable to major projects with substantial development and construction phases which are capitalized as part of the cost of the asset. There was no interest capitalized during the years ended December 31, 2021 and 2020.

Coronado Global Resources Inc. Form 10-K December 31, 2021 132


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

 

(l)Leases

From time to time, the Company enters into mining services contracts which may include embedded leases of mining equipment and other contractual agreements to lease mining equipment and facilities. Based upon the Company’s assessment of the terms of a specific lease agreement, the Company classifies a lease as either finance or operating.

Finance leases

ROU assets related to finance leases are presented in Property, plant and equipment, net on the Consolidated Balance Sheet. Lease liabilities related to finance leases are presented in “Lease Liabilities” (current) and “Lease Liabilities” (non-current) on the Consolidated Balance Sheets.

Finance lease ROU assets and lease liabilities are recognized at the commencement date based on the present value of the future lease payments over the lease term. The discount rate used to determine the present value of the lease payments is the rate implicit in the lease unless that rate cannot be readily determined, in which case, the Company utilizes its incremental borrowing rate in determining the present value of the future lease payments. The incremental borrowing rate is the rate of interest that the Company would have to pay to borrow on a collateralized basis over a similar term an amount equal to the lease payments in a similar economic environment.

Operating leases

ROU assets related to operating leases are presented as Right of Use assets – operating leases, net on the Consolidated Balance Sheet. Lease liabilities related to operating leases that are subject to the ASC 842 measurement requirements such as operating leases with lease terms greater than twelve months are presented in “Lease Liabilities” (current) and “Lease Liabilities” (non-current) on Consolidated Balance Sheets.

Operating lease ROU assets and lease liabilities are recognized at the commencement date based on the present value of the future lease payments over the lease term. The discount rate used to determine the present value of the lease payments is the rate implicit in the lease unless that rate cannot be readily determined, in which case, the Company utilizes its incremental borrowing rate in determining the present value of the future lease payments. The incremental borrowing rate is the rate of interest that the Company would have to pay to borrow on a collateralized basis over a similar term an amount equal to the lease payments in a similar economic environment. Operating lease ROU assets may also include any cumulative prepaid or accrued rent when the lease payments are uneven throughout the lease term. The ROU assets and lease liabilities may also include options to extend or terminate the lease when it is reasonably certain that the Company will exercise that option. The ROU asset includes any lease payments made and lease incentives received prior to the commencement date. The Company has lease arrangements with lease and non-lease components which are accounted for separately. Non-lease components of the lease payments are expensed as incurred and are not included in determining the present value.

(m)Royalties

Lease rights to coal lands are often acquired in exchange for royalty payments. Advance mining royalties are advance payments made to lessors under terms of mineral lease agreements that are recoupable against future production. The Company had advance mining royalties of $5.5 million and $4.4 million respectively, included in “Other current assets” as of December 31, 2021 and 2020.

(n)Stanwell Rebate

The Stanwell rebate relates to a contractual arrangement entered into by Curragh with Stanwell Corporation Limited, a State of Queensland owned electricity generator, which requires payment of a rebate for export coal sold from some of Curragh’s mining tenements. The rebate obligation is accounted for as an executory contract and the expense is recognized as incurred.

(o)Revenue Recognition

The Company accounts for a contract when it has approval and commitment from both parties, the rights of the parties are identified, payment terms are identified, the contract has commercial substance and collectability of consideration is probable. Once a contract is identified, the Company evaluates whether the combined or single contract should be accounted for as more than one performance obligation.

Coronado Global Resources Inc. Form 10-K December 31, 2021 133


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

The Company recognizes revenue when control is transferred to the customer. For the Company’s contracts, in order to determine the point in time when control transfers to customers, the Company uses standard shipping terms to determine the timing of transfer of legal title and the significant risks and rewards of ownership. The Company also considers other indicators including timing of when the Company has a present right to payment and when physical possession of products is transferred to customers. The amount of revenue recognized includes any adjustments for variable consideration, which is included in the transaction price and allocated to each performance obligation based on the relative standalone selling price. The variable consideration is estimated through the course of the contract using management’s best estimates.

The majority of the Company’s revenue is derived from short term contracts where the time between confirmation of sales orders and collection of cash is not more than a few months.

Taxes assessed by a governmental authority that are both imposed on and concurrent with a specific revenue-producing transaction that are collected by the Company from a customer are excluded from revenue.

Performance obligations

A performance obligation is a promise in a contract to transfer a distinct good or service to the customer. A contract’s transaction price is allocated to each distinct performance obligation and recognized as revenue when, or as, the performance obligation is satisfied.

The Company’s contracts have multiple performance obligations as the promise to transfer the individual unit of coal is separately identifiable from other units of coal promised in the contracts and, therefore, distinct. Performance obligations, as described above, primarily relate to the Company’s promise to deliver a designated quantity and type of coal within the quality specifications stated in the contract.

For contracts with multiple performance obligations, we allocate the contract’s transaction price to each performance obligation on a relative standalone selling price basis. The standalone selling price is determined at each contract inception using an adjusted market assessment approach. This approach focuses on the amount that the Company believes the market is willing to pay for a good or service, considering market conditions, such as benchmark pricing, competitor pricing, market awareness of the product and current market trends that affect the pricing.

Warranties provided to customers are assurance-type of warranties on the fitness of purpose and merchantability of the Company’s goods and services. The Company does not provide service-type of warranties to customers.

Revenue is recognized at a point in time and therefore there are no unsatisfied and/or partially satisfied performance obligations at December 31, 2021 and 2020.

Shipping and Handling

The Company accounts for shipping and handling activities after the customer obtains control of the good as an activity to fulfil the promise to transfer the good. Therefore, the Company does not evaluate whether the shipping and handling services are promised services to its customers.

Shipping and handling costs paid to third party carriers and invoiced to coal customers are recorded as freight expense and other revenues, respectively.

(p)Commodity Price Risk

The Company has commodity price risk arising from fluctuations in domestic and global coal prices.

The Company’s principal philosophy is not to hedge against movements in coal prices unless there are exceptional circumstances. Any potential hedging of coal prices would be through fixed price contracts.

The Company is also exposed to commodity price risk related to diesel fuel purchases. The Company may periodically enter into arrangements that protect against the volatility in fuel prices as follows:

•enter into fixed price contracts to purchase fuel for the U.S. Operations.

•enter into derivative financial instruments to hedge exposures to fuel price fluctuations. Refer to Note 25 “Derivatives and Fair Value Measurement.”

Coronado Global Resources Inc. Form 10-K December 31, 2021 134


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

 

(q)Income Taxes

The Company uses the asset and liability approach to account for income taxes as required by ASC 740, Income Taxes, which requires the recognition of deferred income tax assets and liabilities for the expected future tax consequences attributable to differences between the financial statement carrying amounts of existing assets and liabilities and their respective tax bases.

Valuation allowances are provided when necessary to reduce deferred income tax assets to the amount expected to be realized, on a more likely than not basis.

The Company recognizes the benefit of an uncertain tax position that it has taken or expects to take on income tax returns it files if such tax position is more likely than not to be sustained on examination by the taxing authorities, based on the technical merits of the position. These tax benefits are measured based on the largest benefit that has a greater than 50% likelihood of being realized upon ultimate resolution.

The Company’s foreign structure consists of Australian entities which are treated as corporations subject to tax under Australian taxing authorities. The Curragh entities are treated as a branch for U.S. tax purposes and all income flows through the ultimate parent (the Company).

(r)Fair Value Measurements

The Company utilizes valuation techniques that maximize the use of observable inputs and minimize the use of unobservable inputs to the extent possible. The Company determines fair value based on assumptions that market participants would use in pricing an asset or liability in the principal or most relevant market. When considering market participant assumptions in fair value measurements, the Company distinguishes between observable and unobservable inputs, which are categorized in one of 3 levels of inputs.

See Note 25(b), “Derivatives and Fair Value Measurement” for detailed information related to the Company’s fair value policies and disclosures.

(s)Derivative accounting

The Company recognizes at fair value all contracts meeting the definition of a derivative as assets or liabilities in the consolidated balance sheet.

With respect to derivatives used in hedging activities, the Company assesses, both at inception and at least quarterly thereafter, whether such derivatives are highly effective at offsetting the changes in the anticipated exposure of the hedged item. The change in the fair value of derivatives designated as a cash flow hedge and deemed highly effective is recorded in “Accumulated other comprehensive losses” until the hedged transaction impacts reported earnings, at which time any gain or loss is reclassified to earnings. If the hedge ceases to qualify for hedge accounting, the Company prospectively recognizes changes in the fair value of the instrument in earnings in the period of the change. The potential for hedge ineffectiveness is present in the design of certain of the Company’s cash flow hedge relationships.

The Company’s asset and liability derivative positions are offset on a counterparty-by-counterparty basis if the contractual agreement provides for the net settlement of contracts with the counterparty in the event of default or termination of any one contract.

(t)Share-based Compensation

The Company has a share-based compensation plan which allows for the grant of certain equity-based incentives including stock options, performance stock units (“PSU”) and restricted stock units (“RSU”) to employees and executive directors, valued in whole or in part with reference to the Company’s CDIs or equivalent common shares (on a 10:1 CDI to common share ratio).

The grant-date fair value of stock option award is estimated on the date of grant using Black-Scholes-Merton option-pricing model. For certain options and PSUs, the Company includes a relative Total Stockholder Return (“TSR”) modifier to determine the number of shares earned at the end of the performance period. The fair value of awards that include the TSR modifier is determined using a Monte Carlo valuation model.

The expense for these equity-based incentives is based on their fair value at date of grant and is amortized over the required service period, generally the vesting period. The Company accounts for forfeitures as and when they occur.

Coronado Global Resources Inc. Form 10-K December 31, 2021 135


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

See Note 23, “Share-Based Compensation” for detailed information related to the Company’s share-based compensation plans.

(

u)Earnings per Share

Basic earnings per share is computed by dividing net income attributable to stockholders of the Company by the weighted-average number of shares of common stock outstanding during the reporting period.

Diluted net income per share is computed using the weighted-average number of shares of common stock and dilutive potential shares of common stock outstanding during the period. Dilutive potential shares of common stock primarily consist of employee stock options and restricted stock.

(v)Deferred Financing Costs

The Company capitalizes costs incurred in connection with new borrowings, the establishment or enhancement of credit facilities and the issuance of debt securities. These costs are amortized as an adjustment to interest expense over the life of the borrowing or term of the credit facility using the effective interest method. Debt issuance costs related to a recognized liability are presented in the balance sheet as a direct reduction from the carrying amount of that liability whereas debt issuance costs related to a credit facility are shown as an asset.

For information on the unamortized balance of deferred financing fees related to outstanding debt, see Note 17 to the Consolidated Balance Sheets, “Interest Bearing Liabilities”.

 

 

 

 

 

 

3.Segment Information

The Company has a portfolio of operating mines and development projects in Queensland, Australia and in the states of Pennsylvania, Virginia and West Virginia in the U.S. The operations in Australia, or Australian Operations, comprise the 100%-owned Curragh producing mine complex. The operations in the United States, or U.S Operations, comprise two 100%-owned producing mine complexes (Buchanan and Logan), one 100%-owned temporarily idled mine complex (Greenbrier) and two development properties (Mon Valley, formally named Pangburn-Shaner-Fallowfield, and Russell County). The idled Amonate mine property was sold during the year ended December 31, 2021. Refer to Note 4 “Assets Held for Sale”.

The Company operates its business along two reportable segments: Australia and United States. The organization of the two reportable segments reflects how Coronado’s chief operating decision maker, or CODM, manages and allocates resources to the various components of the Company’s business.

The CODM uses Adjusted EBITDA as the primary metric to measure each segment’s operating performance. Adjusted EBITDA is not a measure of financial performance in accordance with U.S. GAAP. Investors should be aware that the Company’s presentation of Adjusted EBITDA may not be comparable to similarly titled financial measures used by other companies.

Adjusted EBITDA is defined as earnings before interest, taxes, depreciation, depletion and amortization and other foreign exchange losses. Adjusted EBITDA is also adjusted for certain discrete items that management exclude in analyzing each of the Company’s segments’ operating performance. “Other and corporate” relates to additional financial information for the corporate function such as financial reporting and accounting, treasury, legal, human resources, compliance, and tax. As such, the corporate function is not determined to be a reportable segment but is discretely disclosed for purposes of reconciliation to the Company’s consolidated financial statements.

Coronado Global Resources Inc. Form 10-K December 31, 2021 136


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

Reportable segment results for the years ended December 31, 2021, 2020 and 2019 are presented below:

 

 

Australia

 

United States

 

Other and Corporate

 

Total

 

 

(US$ thousands)

Year ended December 31, 2021

 

 

 

 

 

 

 

 

Total revenues

 

1,315,851

 

832,620

 

—

 

2,148,471

Adjusted EBITDA

 

204,992

 

312,048

 

(30,907)

 

486,133

Net income (loss)

 

64,278

 

220,975

 

(95,830)

 

189,423

Total assets

 

1,357,132

 

822,222

 

282,058

 

2,461,412

Capital expenditures

 

38,733

 

50,787

 

1,616

 

91,136

 

 

 

 

 

 

 

 

 

Year ended December 31, 2020

 

 

 

 

 

 

 

 

Total revenues

 

976,369

 

485,893

 

—

 

1,462,262

Adjusted EBITDA

 

(8,586)

 

92,801

 

(30,416)

 

53,799

Net loss

 

(66,645)

 

(77,853)

 

(82,039)

 

(226,537)

Total assets

 

1,307,745

 

908,361

 

(67,630)

 

2,148,476

Capital expenditures

 

47,456

 

74,881

 

1,519

 

123,856

 

 

 

 

 

 

 

 

 

Year ended December 31, 2019

 

 

 

 

 

 

 

 

Total revenues

 

1,465,957

 

749,791

 

—

 

2,215,748

Adjusted EBITDA

 

421,660

 

248,647

 

(36,139)

 

634,168

Net income (loss)

 

246,668

 

120,921

 

(62,112)

 

305,477

Total assets

 

1,137,290

 

1,023,770

 

53,794

 

2,214,854

Capital expenditures

 

77,607

 

105,675

 

1

 

183,283

 

The reconciliation of Adjusted EBITDA to net income attributable to the Company for the years ended December 31, 2021, 2020 and 2019 are as follows:

 

 

 

 

 

 

 

Year Ended December 31,

 

 

2021

 

2020

 

2019

 

 

(US$ thousands)

Net income (loss)

 

$

189,423

 

 

(226,537)

 

 

305,477

Depreciation, depletion and amortization

 

 

177,875

 

 

191,189

 

 

176,461

Interest expense, net

 

 

68,062

 

 

50,585

 

 

39,294

Other foreign exchange losses (gains)

 

 

7,049

 

 

1,175

 

 

(1,745)

Loss on debt extinguishment

 

 

8,477

 

 

—

 

 

—

Income tax expense (benefit)

 

 

53,102

 

 

(60,016)

 

 

114,681

Impairment of assets

 

 

—

 

 

78,111

 

 

—

Restructuring costs(1)

 

 

2,300

 

 

—

 

 

—

Losses on idled assets held for sale(2)

 

 

2,732

 

 

9,994

 

 

—

Gain on disposal of assets held for sale

 

 

(14,845)

 

 

—

 

 

—

(Decrease) increase in provision for discounting

and credit losses

 

 

(8,042)

 

 

9,298

 

 

—

Consolidated adjusted EBITDA

 

$

486,133

 

 

53,799

 

 

634,168

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 137


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

(1) During the year ended December 31, 2021, a restructuring and cost transformation initiative commenced at the Australian Operations to focus on repositioning the Company’s efforts to align its cost structures and optimize its coal production relative to the prevailing global coal market conditions. Costs associated with this initiative include non-recurring voluntary and non-voluntary workforce reduction, external consulting services and other related activities.

(2) These losses relate to idled non-core assets that the Company has classified as held for sale with the view that these will be sold within the next twelve months or have been sold during the year ended December 31, 2021.

The reconciliations of capital expenditures per the Company’s segment information to capital expenditures disclosed on the Consolidated Statements of Cash Flows for the years ended December 31, 2021, 2020 and 2019 are as follows:

 

 

Year Ended December 31,

 

 

2021

 

2020

 

2019

 

 

(US$ thousands)

Capital expenditures per Consolidated Statement of Cash flows

 

$

89,661

 

 

117,856

 

 

183,283

Payment for capital acquired in prior period

 

 

(6,000)

 

 

—

 

 

—

Accruals for capital expenditures

 

 

7,475

 

 

6,000

 

 

—

Capital expenditures per segment detail

 

 

91,136

 

 

123,856

 

 

183,283

 

Disaggregation of Revenue

The Company disaggregates the revenue from contracts with customers by major product group for each of the Company’s segments, as the Company believes it best depicts the nature, amount, timing and uncertainty of revenues and cash flows. All revenue is recognized at a point in time.

 

 

Year ended December 31, 2021

 

 

Australia

 

United States

 

Total

 

 

($ thousands)

Product Groups

 

 

 

 

 

 

Metallurgical coal

 

1,171,869

 

822,000

 

1,993,869

Thermal coal

 

107,867

 

6,595

 

114,462

Total coal revenue

 

1,279,736

 

828,595

 

2,108,331

Other (1)

 

36,115

 

4,025

 

40,140

Total

 

1,315,851

 

832,620

 

2,148,471

 

 

 

Year ended December 31, 2020

 

 

Australia

 

United States

 

Total

 

 

($ thousands)

Product Groups

 

 

 

 

 

 

Metallurgical coal

 

836,545

 

476,222

 

1,312,767

Thermal coal

 

105,681

 

5,151

 

110,832

Total coal revenue

 

942,226

 

481,373

 

1,423,599

Other (1)

 

34,143

 

4,520

 

38,663

Total

 

976,369

 

485,893

 

1,462,262

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 138


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

 

 

Year ended December 31, 2019

 

 

Australia

 

United States

 

Total

 

 

($ thousands)

Product Groups

 

 

 

 

 

 

Metallurgical coal

 

1,327,421

 

696,541

 

2,023,962

Thermal coal

 

102,867

 

47,510

 

150,377

Total coal revenue

 

1,430,288

 

744,051

 

2,174,339

Other (1)

 

35,669

 

5,740

 

41,409

Total

 

1,465,957

 

749,791

 

2,215,748

 

(1) Included in Other is the amortization of Stanwell non-market coal supply agreement liability recognized on acquisition of Curragh. See further discussion in Note 19 “Contract Obligations.”

Further explanation to tables above:

The following is a description of the principal activities by reportable segments.

•The Company primarily offers two types of products to its customers: metallurgical coal and thermal coal of varying qualities. Metallurgical coal can be further distinguished by its volatility, defined as high, mid, or low.

•The Australian Operations reportable segment includes the Curragh mine. The Australian Operations is a separate reportable segment due to having separate management, location, assets, and operations. Curragh mine, included in the Australian Operations, is located in central Queensland, Australia and produces a wide variety of metallurgical coal.

•The United States reportable segment includes the Buchanan, Logan and Greenbrier coal mine facilities in Virginia and West Virginia, United States. It produces high, mid and low volatility hard coking coal.

 

4. Assets Held for Sale

The Company classifies assets and liabilities as held for sale (disposal group) when management, having the authority to approve the action, commits to a plan to sell the disposal group, the sale is probable within one year and the disposal group is available for sale in its present condition. The Company also considers whether an active program to locate a buyer has been initiated, whether the disposal group is marketed actively for sale at a price that is reasonable in relation to its current fair value, and whether actions required to complete the plan indicate that it is unlikely that significant changes to the plan will be made or that the plan will be withdrawn. An impairment test is performed when a disposal group is classified as held for sale and an impairment charge is recorded when the carrying amount of the disposal group exceeds its estimated fair value, less cost to sell. Depreciation and amortization for assets classified as held for sale are ceased.

During the fourth quarter of 2020, the Company committed to a plan to sell the Greenbrier and Amonate mining assets and determined that all of the criteria to classify assets and liabilities as held for sale were met. These assets are part of the Company’s U.S. segment, located in the States of Virginia and West Virginia, and do not form part of the Company’s core business strategy. The Greenbrier mining asset has been idled since April 1, 2020, and the Amonate mining asset has been idled since its acquisition in 2016.

Sale of the Amonate Mining Asset

On October 26, 2021, the Company entered into a definitive agreement to sell Amonate, including related assets and liabilities to Ramaco Resources, Inc., a Delaware corporation, for a purchase price of $30.0 million. The sale of Amonate was completed on December 2, 2021, and the pre-tax net realized gain of $14.8 million after transaction costs of $2.6 million, was included within “Gain on disposal of asset held for sale” in the Company’s Consolidated Statement of Operations and Comprehensive Income for the year ended December 31, 2021.

Coronado Global Resources Inc. Form 10-K December 31, 2021 139


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

The following table provides the major classes of assets and liabilities classified as held for sale as of December 31, 2021 and December 31, 2020:

 

 

 

December 31

(US$ thousands)

 

2021

 

2020

Trade receivables, net

 

$

—

 

 

55

Inventories, net

 

 

1,795

 

 

5,910

Other current assets

 

 

1,706

 

 

653

Property, plant and equipment, net

 

 

23,447

 

 

45,831

Other noncurrent assets

 

 

75

 

 

75

Total assets held for sale

 

$

27,023

 

 

52,524

Accounts payable

 

 

426

 

 

271

Accrued expenses and other current liabilities

 

 

1,344

 

 

1,516

Current asset retirement obligations

 

 

5,140

 

 

3,199

Other financial liabilities

 

 

—

 

 

1,384

Noncurrent asset retirement obligations

 

 

5,203

 

 

10,349

Total liabilities held for sale

 

$

12,113

 

 

16,719

 

 

During the year ended December 31, 2021, the Company identified $6.3 million of the Greenbrier’s property, plant and equipment assets held for sale that will be excluded from the future sale and held for use at its other U.S. mining complexes.

As of December 31, 2021, the assets and liabilities held for sale represent the fair value of the Greenbrier mining asset, which will likely be realized through a potential sale within the next 12 months.

The fair value of the Greenbrier mining asset was primarily driven by non-binding indicative offers and Level 3 inputs such as estimates of future cash flows which aligns to the Company’s best estimate of future market and operating conditions, including its current life of mine plan. The life of mine plan includes assumptions in relation to coal price forecasts, projected mine production volumes, operating costs, capital costs and discount rate.

 

5. Impairment of Assets

Long-lived assets, such as property, plant, and equipment, and purchased intangible assets subject to amortization, are reviewed for impairment whenever events or changes in circumstances indicate that the carrying amount of an asset may not be recoverable. If circumstances require a long-lived asset or asset group be tested for possible impairment, the Company first compares undiscounted pre-tax cash flows expected to be generated by that asset or asset group to its carrying amount. If the carrying amount of the long-lived asset or asset group is not recoverable on an undiscounted pre-tax cash flow basis, an impairment is recognized to the extent that the carrying amount exceeds its fair value. Fair value is determined through various valuation techniques including discounted cash flow models, quoted market values and third-party independent appraisals, as considered necessary.

During the year ended December 31, 2020, the Company performed an impairment assessment in accordance with ASC 360 – Property, Plant and Equipment, and determined that the sum of the estimated undiscounted pre-tax future cash flows of Greenbrier long-lived assets exceeded its carrying amount. As a result, an impairment charge of $78.1 million was recorded, reducing the carrying amount of Greenbrier’s long-lived assets to its fair value of approximately $30.0 million, which did not include any associated ARO liabilities.

The following costs are reflected in “Impairment of Assets” in the Consolidated Statement of Operations and Other Comprehensive Income for the year ended December 31, 2020:

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 140


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

 

 

Reportable Segment

(US$ thousands)

 

United States

Property, plant and equipment, net

 

$

77,481

Right of use asset – operating leases, net

 

 

10

Intangible assets, net

 

 

620

Total

 

$

78,111

 

The Company concluded that no indicators of impairment or requisite charges were required at any of the Company’s mining assets for the years ended December 31, 2021 and 2019.

 

 

6. Other, net

Other, net consists of the following:

 

 

Year Ended December 31,

 

 

2021

 

2020

 

2019

 

 

(US$ thousands)

Other foreign exchange gains (losses)

 

 

(7,049)

 

 

(1,175)

 

 

1,745

Other income

 

 

862

 

 

567

 

 

904

Total Other, net

 

$

(6,187)

 

$

(608)

 

$

2,649

 

7. Capital Structure

(a) Stockholders’ Equity

Authorized capital stock

The Company’s Articles of Incorporation, as amended, authorize the Company to issue 1,100,000,000 shares of $0.01 par value capital stock consisting of 1,000,000,000 shares of common stock and 100,000,000 shares of preferred stock.

Issued Stock

In 2018, 80,000,000 common shares and one Series A Preferred Share were issued by the Company and held by Coronado Group LLC. The holders of Series A Preferred Stock are permitted to nominate and elect members of the Company’s Board of Directors in relation to the level of the holder’s aggregate beneficial ownership of shares of the Company’s common stock. All common shares and preferred shares have a par value of $0.01.

On October 23, 2018, the Company completed an initial public offering, or IPO, on the Australian Securities Exchange, or ASX. Upon completion of the IPO on the ASX, the Company issued 16,651,692 new shares of common stock (166,516,920 CDIs), raising cash proceeds of $473.4 million, prior to issuance costs of $30.6 million. Coronado Group LLC sold 2,691,896.4 shares of common stock (26,918,964 CDIs) and the Company did not receive any proceeds from the sale of these securities. A portion of the proceeds from the IPO were used to repay all outstanding borrowings and to pay fees and expenses related to the IPO.

On July 28, 2019, the Company registered its common stock pursuant Section 12(g) of the Securities Exchange Act of 1934, as amended, or the Exchange Act.

During the year ended December 31, 2020, the Company successfully completed the institutional and retail component of a fully underwritten 2 for 11 pro-rata accelerated non-renounceable entitlement offer, or the 2020 Entitlement Offer. On completion, a total of 417,361,980 fully paid new CDIs (representing a beneficial interest in 41,736,198 shares of common stock) were issued at a price of A$0.60 per CDI, resulting in gross proceeds of $179.8 million (A$250.5 million).

Proceeds from the 2020 Entitlement Offer, net of share issuance costs, of $179.8 million were used to repay a portion of drawn balances under the prior syndicated facility agreement.

Coronado Global Resources Inc. Form 10-K December 31, 2021 141


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

On May 14, 2021, the Company successfully completed the institutional component of a fully underwritten 1-for-4.73 pro-rata accelerated non-renounceable entitlement offer, or the 2021 Entitlement Offer. On completion, a total of 253,108,820 fully paid new CDIs (representing a beneficial interest in 25,310,882 shares of common stock) were issued at a price of A$0.45 per CDI, resulting in gross proceeds of $87.7 million (A$113.9 million).

On June 1, 2021, the Company successfully completed the retail component of the 2021 Entitlement Offer. On completion, a total of 39,466,010 fully paid new CDIs (representing a beneficial interest in 3,946,601 shares of common stock) were issued on the ASX at a price of A$0.45 per CDI, resulting in gross proceeds of $13.7 million (A$17.8 million).

Proceeds from the 2021 Entitlement Offer, net of share issuance costs, of $97.7 million were included as part of a refinancing transaction, which involved the (i) repayment of all outstanding obligations under the Company’s Multicurrency Revolving Syndicated Facility Agreement, or SFA, and termination of such agreement; (ii) cash collateralization of credit support facilities, which were used to provide back-to-back support for bank guarantees that had been previously issued under the SFA; and (iii) payment of discounts, fees and expenses related to the refinancing transaction. See Note 17 “Interest Bearing Liabilities”.

The Company issued a total of 29,257,483 shares of common stock, with a par value of $0.01, during the year ended December 31, 2021.

Coronado Group LLC

Coronado Group LLC, the Company’s controlling stockholder, exercised its right to participate in the institutional component of the 2021 Entitlement Offer and purchased 71,980,363 CDIs (representing a beneficial interest in 7,198,036 shares of common stock) at a price of A$0.45 per CDI, resulting in gross proceeds of $24.9 million (A$32.4 million).

As of December 31, 2020, Coronado Group LLC beneficially owns 845,061,399 CDIs (representing a beneficial interest in 84,506,140 shares of common stock) representing 50.4% of the total 1,676,453,730 CDIs (representing a beneficial interest in 167,645,373 shares of common stock) outstanding. The remaining 831,392,331 CDIs (representing a beneficial interest in 83,139,233 shares of common stock) are owned by investors in the form of CDIs publicly traded on the ASX.

Refer to Note 23 “Share-Based Compensation” for options to purchase common stock issued and outstanding as of December 31, 2021 and 2020.

Common Stock / CDIs

The common stock is publicly traded on the ASX under the ticker “CRN,” in the form of CHESS Depositary Interests (“CDIs). CDIs are units of beneficial ownership in shares of common stock held by CHESS Depositary Nominees Pty Limited (“CDN”), a wholly-owned subsidiary of ASX Limited, the company that operates the ASX.

As each CDI represents one tenth of a share, holders of CDIs will be entitled to onevote for every 10 CDIs they hold. CDI holders are to receive entitlements which attach to underlying shares such as participation in rights issues, bonus issues, capital reductions and liquidation preferences.

The CDIs entitle holders to dividends, if any, and other rights economically equivalent to shares of common stock, including the right to attend stockholders’ meetings. CDN, as the stockholder of record, will vote the underlying shares in accordance with the directions of the CDI holders.

Preferred Stock

The Series A Preferred Share provides the holder with Board designation rights which are tied to the level of beneficial ownership of common shares in the Company. The Series A Preferred Share is not entitled to dividends and is non-transferable. The Series A Preferred Share has a liquidation preference of $1.00.

(b) Dividends

The dividend policy and the payment of future cash dividends are subject to the discretion of the Company’s Board of Directors.

During the year ended December 31, 2021, the Company did not declare or pay dividends.

Coronado Global Resources Inc. Form 10-K December 31, 2021 142


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

During the year ended December 31, 2020, the Company declared a dividend to stockholders and CDI holders on the ASX of $24.2 million, or $0.025 per CDI ($0.25 per share of common stock). The dividend was paid on March 31, 2020.

During the year ended December 31, 2019, the Company paid the following dividends to stockholders and CDI holders on the ASX:

•Dividends of $299.7 million, or $0.31 per CDI ($3.1 per share of common stock), on March 29, 2019;

•Dividends of $108.2 million, or $0.112 per CDI ($1.12 per share of common stock), on September 20, 2019; and

•Return of capital of $288.0 million, or $0.298 per CDI ($2.98 per share of common stock), on September 20, 2019.

(c) Earnings per Share

Basic earnings per share of common stock is computed by dividing net income attributable to the Company for the period, by the weighted-average number of shares of common stock outstanding during the same period. Diluted earnings per share of common stock is computed by dividing net income attributable to the Company by the weighted-average number of shares of common stock outstanding adjusted to give effect to potentially dilutive securities. During periods in which the Company incurs a net loss, diluted weighted average shares outstanding are equal to basic weighted average shares outstanding because the effect of all equity awards is anti-dilutive.

Basic and diluted earnings per share was calculated as follows (in thousands, except per share data):

 

 

Year Ended December 31,

(US$ thousands, except per share data)

 

2021

 

2020

 

2019

Numerator:

 

 

 

 

 

 

 

 

 

Net income (loss)

 

 

189,423

 

 

(226,537)

 

 

305,477

Less: Net (loss) attributable to Non-controlling interest

 

 

(2)

 

 

(69)

 

 

(61)

Net income (loss) attributable to Company stockholders

 

 

189,425

 

 

(226,468)

 

 

305,538

 

 

 

 

 

 

 

 

 

 

Denominator (in thousands):

 

 

 

 

 

 

 

 

 

Weighted-average shares of common stock outstanding

 

 

156,710

 

 

111,073

 

 

96,652

Effects of dilutive shares

 

 

132

 

 

—

 

 

3

Weighted average diluted shares of common stock outstanding

 

 

156,842

 

 

111,073

 

 

96,655

 

 

 

 

 

 

 

 

 

 

Earnings (Loss) Per Share (US$):

 

 

 

 

 

 

 

 

 

Basic

 

 

1.21

 

 

(2.04)

 

 

3.16

Dilutive

 

 

1.21

 

 

(2.04)

 

 

3.16

 

8. Trade and related party receivables

The Company extends trade credit to its customers in the ordinary course of business. Trade receivables and related party receivables are recorded initially at fair value and subsequently at amortized cost, less any ECL.

Xcoal

On May 27, 2021, Xcoal Energy and Resources, or Xcoal, ceased to be a related party after Xcoal’s founder, chief executive officer and chief marketing officer, Mr. Ernie Thrasher, retired as a non-executive director of the Company.

During the year ended December 31, 2021, Xcoal repaid its past due balance outstanding from 2020 of $85.2 million in full. During the year ended December 31, 2021, the Company fully reversed the provision for discounting and credit losses of $9.0 million recorded at December 31, 2020 in respect of past due amounts.

Coronado Global Resources Inc. Form 10-K December 31, 2021 143


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

“Coal revenues from related parties” of $97.3 million in the Consolidated Statements of Operations and Comprehensive Income for the period up to May 27, 2021, represent revenues from Xcoal while it was a related party. Revenues from coal sales to Xcoal after May 27, 2021 of $137.1 million for the period ended December 31, 2021 are included within “Coal revenues” in the Consolidated Statements of Operations and Comprehensive Income.

Revenues from Xcoal of $134.6 million and $468.9 million for the years ended December 31, 2020 and 2019, respectively, are recorded as “Coal revenues from related parties” in the Consolidated Statements of Operations and Comprehensive Income.

 

From July 1, 2021, the Company agreed credit terms with Xcoal. Any sales in excess of the credit amount are made on prepayment, letter of credit or cash on delivery basis.

At December 31, 2021, amounts outstanding from Xcoal in respect of coal sales was $35.2 million, of which $17.9 million was past due, and is included within “Trade receivables, net” on the Consolidated Balance Sheet. Subsequent to December 31, 2021, the Company has collected the Xcoal’s past due balance in full. The carrying amount of trade receivables from Xcoal, net of provision for credit losses of $0.4 million, was $34.8 million.

At December 31, 2020, amounts outstanding from Xcoal in respect of coal sales were $91.0 million, of which $85.2 million was past due and was included in “Related party trade receivables” on the Consolidated Balance Sheet, and $5.8 million was secured by a letter of credit. As of December 31, 2020, the carrying amount of related party trade receivables from Xcoal, net of a $9.0 million provision for discounting and credit losses, was $82.0 million.

9. Provision for Credit Losses

The following table provides the reconciliation of the allowance for credit losses that is deducted from financial assets to present the net amount expected to be collected:

 

(in US$ thousands)

 

 

Trade and related party trade receivables

 

 

Other Assets

 

 

Total

As at January 1, 2020

 

$

—

 

$

—

 

$

—

Change in estimates during the current period

 

 

9,298

 

 

—

 

 

9,298

As at December 31, 2020

 

 

9,298

 

 

—

 

 

9,298

Change in estimates during the current period

 

 

436

 

 

522

 

 

958

Unwind of provision for expected credit losses (Note 8)

 

 

(9,000)

 

 

—

 

 

(9,000)

As at December 31, 2021

 

$

734

 

$

522

 

$

1,256

 

10. Inventories

 

 

 

 

December 31,

(US$ thousands)

 

2021

 

2020

Raw coal

 

$

17,334

 

$

19,557

Saleable coal

 

 

42,006

 

 

26,581

Total coal inventories

 

 

59,340

 

 

46,138

Supplies inventory

 

 

59,582

 

 

63,997

Total inventories

 

$

118,922

 

$

110,135

 

Coal inventories measured at its net realizable value were $2.2 million and $0.7 million at December 31, 2021 and 2020, respectively, and relates to coal designated for deliveries under the Stanwell non-market coal supply agreement. See further discussion in Note 19 “Contract Obligations”.

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 144


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

11. Property, Plant and Equipment

The following table indicates the carrying amount of each of the major classes of the Company’s consolidated depreciable assets:

 

 

December 31,

(US$ thousands)

 

2021

 

2020

Land

 

$

27,853

 

$

27,985

Buildings and improvements

 

 

88,079

 

 

89,726

Plant, machinery, mining equipment and transportation vehicles

 

 

963,272

 

 

939,521

Mineral rights and reserves

 

 

374,326

 

 

374,340

Office and computer equipment

 

 

8,718

 

 

4,316

Mine development

 

 

566,201

 

 

577,631

Asset retirement obligation asset

 

 

75,215

 

 

81,603

Construction in process

 

 

42,055

 

 

38,321

 

 

 

2,145,719

 

 

2,133,443

Less accumulated depreciation, depletion and amortization

 

 

748,356

 

 

611,935

Net property, plant and equipment

 

$

1,397,363

 

$

1,521,508

 

The amount of depreciation and depletion expense for property, plant and equipment for the years ended December 31, 2021, 2020 and 2019 was $166.2 million, $187.7 million and $167.2 million, respectively.

 

 

12.Goodwill and Other Intangible Assets

(a) Acquired Intangible Assets

 

 

December 31, 2021

(US$ thousands)

 

Weighted average amortization period (years)

 

Gross carrying amount

 

Accumulated amortization

 

Net carrying amount

Intangible assets:

 

 

 

 

 

 

 

 

 

 

 

Amortizing intangible assets:

 

 

 

 

 

 

 

 

 

 

 

Mining permits - Logan

 

15

 

$

1,642

 

$

912

 

$

730

Mining permits - Buchanan

 

28

 

 

3,501

 

 

717

 

 

2,784

Total intangible assets

 

 

 

$

5,143

 

$

1,629

 

$

3,514

 

 

 

 

 

 

 

 

 

 

 

 

 

 

December 31, 2020

(US$ thousands)

 

Weighted average amortization period (years)

 

Gross carrying amount

 

Accumulated amortization

 

Net carrying amount

Intangible assets:

 

 

 

 

 

 

 

 

 

 

 

Amortizing intangible assets:

 

 

 

 

 

 

 

 

 

 

 

Mining permits - Logan

 

15

 

 

1,642

 

 

834

 

 

808

Mining permits - Buchanan

 

28

 

 

4,000

 

 

591

 

 

3,409

Total intangible assets

 

 

 

$

5,642

 

$

1,425

 

$

4,217

Amortization expense is charged using the straight-line method over the useful lives of the respective intangible asset. The aggregate amount of amortization expense for amortizing intangible assets for the years ended December 31, 2021, 2020 and 2019, were $0.2 million, $0.2 million and $0.3 million, respectively. Estimated amortization expense for each of the next five years is $0.2 million.

Coronado Global Resources Inc. Form 10-K December 31, 2021 145


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

(b) Goodwill

In connection with the Buchanan acquisition on March 31, 2016, the Company recorded goodwill in the amount of $28.0 million. The Company performed a qualitative assessment to determine if impairment was required at December 31, 2021 or 2020. Based upon the Company’s qualitative assessment, it is more likely than not that the fair value of the reporting unit is greater than the carrying amount at December 31, 2021 and 2020. As a result, no impairment was recorded, and the balance of goodwill at both December 31, 2021 and 2020 was $28.0 million. The Company has not noted any indicators of impairment since the acquisition date.

 

13.Other Assets

 

 

 

 

 

 

 

 

 

December 31,

(US$ thousands)

 

2021

 

2020

Other current assets:

 

 

 

 

 

 

Prepayments

 

$

24,226

 

 

24,112

Long service leave receivable

 

 

9,136

 

 

10,990

Tax credits receivable

 

 

4,440

 

 

—

Other

 

 

9,845

 

 

8,904

Total other current assets

 

$

47,647

 

 

44,006

 

 

 

 

 

 

 

Other non-current assets:

 

 

 

 

Favorable mineral leases

 

$

3,645

 

 

3,925

Deferred debt issue costs

 

 

4,310

 

 

7,475

Long service leave receivable

 

 

550

 

 

864

Tax credits receivable

 

 

11,223

 

 

—

Total other non-current assets

 

$

19,728

 

 

12,264

The Company has other assets which includes favorable mineral leases, deferred debt issue costs, long service leave receivable and coalfield employment enhancement tax credit

The favorable mineral leases are amortized based on the coal tonnage removed from the lease property relative to the total estimated reserves on that property.

Long service leave is paid when leave is taken, with a subsequent reimbursement received from the Coal Mining Industry (Long Service Leave Funding) Corporation in Australia. The reimbursement is recognized in other assets and is measured as the present value of expected future reimbursements to be received.

The deferred issue costs as of December 31, 2021, were incurred to establish the ABL Facility (as described in Note 17. “Interest Bearing Liabilities”) and are accordingly amortized over the life of the facility on a straight-line basis.

The deferred debt issue costs as of December 31, 2020, were incurred to establish and amend the multicurrency revolving Syndicated Facility Agreement or SFA. Following repayment and termination of the SFA on May 14, 2021, the remaining deferred debt issue costs of $5.7 million were written off and included in the “Loss on debt extinguishment’ in the Company’s Consolidated Statement of Operations and Comprehensive Income for year ended December 31, 2021.

The Company recognized tax credits receivable of $15.7 million relating to the Virginia coalfield employment enhancement tax credit which accrued for sales made during the 2018 to 2021 income years. Where the credits exceed the Company’s state tax liability for the tax year, the excess is redeemable by the Tax Commissioner on behalf of the Commonwealth of Virginia for 85% of the face value within 90 days after filing the return. The tax credits allowed can be claimed in the third taxable year following the taxable year in which the credit was earned and allowed. No credit was recognized in 2020 due to uncertainty around the recoverability thereof.

 

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 146


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

14. Accrued Expenses and Other Current Liabilities

Accrued expenses and other current liabilities consist of the following:

 

 

December 31,

(US$ thousands)

 

2021

 

2020

Wages and employee benefits

 

$

41,187

 

$

32,386

Taxes other than income taxes

 

 

6,246

 

 

7,024

Accrued royalties

 

 

70,237

 

 

36,149

Accrued freight costs

 

 

27,754

 

 

29,199

Accrued mining fees

 

 

65,835

 

 

76,044

Acquisition related accruals

 

 

31,201

 

 

33,119

Other liabilities

 

 

28,482

 

 

20,605

Total accrued expenses and other current liabilities

 

$

270,942

 

$

234,526

 

Acquisition related accruals represents amount outstanding for stamp duty payable on the Curragh acquisition of $31.2 million (A$43.0 million). This amount was outstanding as at December 31, 2021 and 2020 pending final assessment to be made by the Queensland Revenue Office in Queensland, Australia.

Coronado Global Resources Inc. Form 10-K December 31, 2021 147


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

 

15. Leases

Information related to Company’s right-of use assets and related lease liabilities are as follows:

 

 

Year ended December 31,

(US$ thousands)

 

2021

 

 

2020

Operating lease costs

 

$

10,863

 

$

17,257

Cash paid for operating lease liabilities

 

 

10,986

 

 

15,329

 

 

 

 

 

 

 

Finance lease costs:

 

 

 

 

 

 

Amortization of right of use assets

 

 

227

 

 

1,867

Interest on lease liabilities

 

 

14

 

 

88

Total finance lease costs

 

$

241

 

$

1,955

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

December 31,

(US$ thousands)

 

2021

 

2020

Operating leases:

 

 

 

 

 

 

Operating lease right-of-use assets

 

$

13,656

 

$

19,498

 

 

 

 

 

 

 

Finance leases:

 

 

 

 

 

 

Property and equipment

 

 

404

 

 

822

Accumulated depreciation

 

 

(67)

 

 

(641)

Property and equipment, net

 

 

337

 

 

181

 

 

 

 

 

 

 

Current operating lease obligations

 

 

8,326

 

 

8,414

Non-current operating lease obligations

 

 

12,685

 

 

20,582

Total Operating lease liabilities

 

 

21,011

 

 

28,996

 

 

 

 

 

 

 

Current finance lease obligations

 

 

126

 

 

—

Non-current finance lease obligations

 

 

209

 

 

—

Total Finance lease liabilities

 

 

335

 

 

—

 

 

 

 

 

 

 

Current lease obligations

 

 

8,452

 

 

8,414

Non-current lease obligations

 

 

12,894

 

 

20,582

Total lease obligations

 

$

21,346

 

$

28,996

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

December 31,

 

 

2021

 

2020

Weighted Average Remaining Lease Term (Years)

 

 

 

 

Weighted average remaining lease term – finance leases

 

2.54

 

-

Weighted average remaining lease term – operating leases

 

2.59

 

3.35

 

 

 

 

 

Weighted Average Discount Rate

 

 

 

 

Weighted discount rate – finance lease

 

7.60%

 

-

Weighted discount rate – operating lease

 

7.95%

 

7.94%

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 148


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

The Company’s operating leases have remaining lease terms of 1 year to 5 years, some of which include options to extend the terms deemed reasonable to exercise. Maturities of lease liabilities are as follows:

(US$ thousands)

 

Operating

Lease

 

Finance

Lease

Year ending December 31,

 

 

 

 

 

 

2022

 

$

9,414

 

$

148

2023

 

 

9,321

 

 

148

2024

 

 

2,920

 

 

74

2025

 

 

869

 

 

—

2026

 

 

818

 

 

—

Thereafter

 

 

—

 

 

—

Total lease payments

 

 

23,342

 

 

370

Less imputed interest

 

 

(2,331)

 

 

(35)

Total lease liability

 

$

21,011

 

$

335

 

16. Asset Retirement Obligations

Reclamation of areas disturbed by mining operations must be performed by the Company in accordance with approved reclamation plans and in compliance with state and federal laws in the states of West Virginia and Virginia in the United States and Queensland in Australia. For areas disturbed, a significant amount of the reclamation will take place in the future when operations cease. There were no assets that were legally restricted for purposes of settling asset retirement obligations as of December 31, 2021 and 2020. In addition, state agencies monitor compliance with the mine plans, including reclamation.

The Company records the fair value of its asset retirement obligations using the present value of projected future cash flows, with an equivalent amount recorded in the related long lived asset or a change to the statements of operations if the related permit is closed. An accretion cost, representing the increase over time in the present value of the liability, is recorded each period and the capitalized cost is depreciated over the useful life of the related asset. As reclamation work is performed or liabilities otherwise settled, the recorded amount of the liability is reduced.

Changes in the asset retirement obligations for the years ended December 31, 2021 and December 31, 2020 were as follows:

(US$ thousands)

 

December 31, 2021

 

December 31, 2020

Total asset retirement obligations at beginning of the year

 

$

122,144

 

$

131,774

ARO liability additions

 

 

1,642

 

 

7,044

Accretion

 

 

9,353

 

 

9,418

Reclamation performed in the year

 

 

(3,322)

 

 

(2,859)

Gain on settlement of ARO

 

 

(601)

 

 

—

Change in estimate recorded to operations

 

 

1,195

 

 

(5,973)

Change in estimate recorded to assets

 

 

(5,444)

 

 

(11,139)

Foreign currency translation adjustment

 

 

(4,690)

 

 

7,427

ARO liability reclassified to liabilities held for sale

 

 

—

 

 

(13,548)

Total Asset retirement obligations at end of the year

 

 

120,277

 

 

122,144

Less current portion

 

 

(9,414)

 

 

(6,012)

Asset retirement obligation, excluding current portion

 

 

110,863

 

 

116,132

Coronado Global Resources Inc. Form 10-K December 31, 2021 149


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

17.Interest Bearing Liabilities

 

The following is a summary of interest-bearing liabilities at December 31, 2021:

 

 

 

 

 

 

 

 

 

 

 

 

(in US$ thousands)

 

 

December 31, 2021

 

 

December 31, 2020

 

Weighted Average Interest Rate at December 31, 2021

 

Final Maturity

10.75% Senior Secured Notes

 

$

315,000

 

$

—

 

12.14%

(2)

 

2026

ABL Facility

 

 

—

 

 

—

 

 

 

 

2024

Multicurrency Revolving Syndicated Facility

 

 

—

 

 

327,625

 

 

 

 

2023

Discount and debt issuance costs(1)

 

 

(14,831)

 

 

—

 

 

 

 

 

Total interest bearing liabilities

 

$

300,169

 

$

327,625

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(1) Deferred debt issuance costs incurred on the establishment of the ABL Facility has been included within "Other non-current assets" on the Consolidated Balance Sheet.

(2) Represents the effective interest rate.

 

 

 

 

 

 

 

 

 

 

 

 

Syndicated Facility Agreement

On May 14, 2021, the Company repaid all obligations under the SFA, including the outstanding balance of $324.1 million, and terminated such agreement using a portion of the net proceeds from the Entitlement Offer along with a portion of proceeds from the offering of the Notes (as defined below). As a result of the early termination of the SFA, the Company recorded a loss on debt extinguishment of $5.7 million in its Consolidated Statements of Operations and Comprehensive Income for the year ended December 31, 2021.

Senior Secured Notes

On May 12, 2021, the Company, entered into an indenture, or the Indenture among Coronado Finance Pty Ltd, or CFPL, an Australian proprietary company and a wholly-owned subsidiary of the Company, which is referred to as the Issuer or the Australian Borrower, the Company, the other guarantors party thereto, which are referred to, collectively with the Company, as the Guarantors, and Wilmington Trust, National Association, as trustee, or the Trustee, and as priority lien collateral trustee, relating to the issuance by the Issuer of $350.0 million aggregate principal amount of 10.750% Senior Secured Notes due 2026, or the Notes.

The Notes were issued at a price of 98.112% of their principal amount and bear interest at a rate of 10.75% per annum. Interest on the Notes is payable semi-annually in arrears on May 15 and November 15 of each year to record holders of the Notes on the immediately preceding May 1 and November 1, as applicable. The Notes mature on May 15, 2026 and are senior secured obligations of the Issuer.

The Notes are guaranteed on a senior secured basis by the Company and its wholly-owned subsidiaries (other than the Issuer) (subject to certain exceptions and permitted liens) and secured by (i) a first-priority lien on substantially all of the Company’s assets and the assets of the other Guarantors (other than accounts receivable and other rights to payment, inventory, intercompany indebtedness, certain general intangibles and commercial tort claims, commodities accounts, deposit accounts, securities accounts and other related assets and proceeds and products of each of the foregoing, or, collectively, the ABL Collateral), or the Notes Collateral, and (ii) a second-priority lien on the ABL Collateral, which is junior to a first-priority lien, for the benefit of the lenders under the Company’s senior secured asset-based revolving credit agreement in an initial aggregate principal amount of $100.0 million, or the ABL Facility.

The terms of the Notes are governed by the Indenture. The Indenture contains customary covenants for high yield bonds, including, but not limited to, limitations on investments, liens, indebtedness, asset sales, transactions with affiliates and restricted payments, including payment of dividends on capital stock.

Upon the occurrence of a “Change of Control,” as defined in the Indenture, the Issuer is required to offer to repurchase the Notes at 101% of the aggregate principal amount thereof, plus accrued and unpaid interest, if any, to, but excluding, the repurchase date. The Issuer also has the right to redeem the Notes at 101% of the aggregate principal amount thereof, plus accrued and unpaid interest, if any, to, but excluding, the repurchase date, following the occurrence of a Change of Control, provided that the Issuer redeems at least 90% of the Notes outstanding prior to such Change of Control. Upon the occurrence of certain changes in tax law (as described in the Indenture), the Issuer may redeem any of the Notes at a redemption price equal to 100% of the principal

Coronado Global Resources Inc. Form 10-K December 31, 2021 150


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

amount of the Notes to be redeemed plus accrued and unpaid interest, if any, to, but excluding, the redemption date.

The Issuer may redeem any of the Notes beginning on May 15, 2023. The initial redemption price of the Notes is 108.063% of their principal amount, plus accrued and unpaid interest, if any, to, but excluding, the redemption date. The redemption price will decline each year after May 15, 2023, and will be 100% of the principal amount of the Notes, plus accrued and unpaid interest, beginning on May 15, 2025. The Issuer may also redeem some or all of the Notes at any time and from time to time prior to May 15, 2023 at a price equal to 100% of the principal amount thereof plus a “make-whole” premium, plus accrued and unpaid interest, if any, to, but excluding, the redemption date.

During any twelve-month period ending prior to May 15, 2023, the Issuer may redeem the Notes (including additional Notes, if any) in an aggregate principal amount not to exceed 10% of the aggregate principal amount of the Notes (including additional Notes, if any) originally issued at a redemption price (expressed as a percentage of principal amount) of 103%, plus accrued and unpaid interest, if any, to, but excluding, the redemption date.

At any time and from time to time on or prior to May 15, 2023, the Issuer may redeem in the aggregate up to 40% of the original aggregate principal amount of the Notes (calculated after giving effect to any issuance of additional Notes) with the net cash proceeds of certain equity offerings, at a redemption price of 110.75%, plus accrued and unpaid interest, if any, to, but excluding, the redemption date, so long as at least 60% of the original aggregate principal amount of the Notes (calculated after giving effect to any issuance of additional Notes) issued under the Indenture remains outstanding after each such redemption and each such redemption occurs within 120 days after the date of the closing of such equity offering.

The Indenture contains customary events of default, including failure to make required payments, failure to comply with certain agreements or covenants, failure to pay or acceleration of certain other indebtedness, certain events of bankruptcy and insolvency, and failure to pay certain judgments. An event of default under the Indenture will allow either the Trustee or the holders of at least 25% in aggregate principal amount of the then-outstanding Notes to accelerate, or in certain cases, will automatically cause the acceleration of, the amounts due under the Notes.

Proceeds from the issuance of the Notes, net of discounting and issuance costs, of $331.8 million were included as part of a refinancing transaction which involved the (i) repayment of all outstanding obligations under the SFA and the termination of such agreement; (ii) cash collateralization of credit support facilities, which were used to provide back-to-back support for bank guarantees that had been previously issued under the SFA; and (iii) payment of discounts, fees and expenses related to the refinancing transaction.

 

In connection with the issuance of the Notes, the Company incurred debt issuance costs of $11.6 million and discount on issuance of $6.6 million, recorded as a direct deduction from the face amount of the Notes.

Partial Redemption of Notes

On November 16, 2021, the Company exercised its optional redemption rights and redeemed $35.0 million, or 10%, of the aggregate principal amount of its Notes at a redemption price equal to 103% of the principal amount of the Notes, plus accrued and unpaid interest on the Notes to, but not including, the date of redemption. The Company recorded a “Loss on debt extinguishment” of $2.8 million in the Consolidated Statement of Operations and Comprehensive Income, which represents the premium paid on redemption and a portion of unamortized debt issuance costs and discount on issuance.

The redemption allocation was determined by lot, in compliance with the requirements of the Depository Trust Company as provided in the indenture governing the Notes.

ABL Facility

On May 12, 2021, the Company, Coronado Coal Corporation, a Delaware corporation and wholly-owned subsidiary of the Company, or the U.S. Borrower, the Australian Borrower and the Guarantors entered into the ABL Facility agreement with Citibank, N.A., as administrative agent and a lender, and various other financial institutions, with an aggregate multi-currency lender commitment of up to $100.0 million, including a $30.0 million sublimit for the issuance of letters of credit and $5.0 million for swingline loans, at any time outstanding, subject to borrowing base availability. The ABL Facility will mature on May 12, 2024 and replaces the SFA.

Revolving loan (and letter of credit) availability under the ABL Facility is subject to a borrowing base, which at any time is equal to the sum of certain eligible accounts receivable, certain eligible inventory and certain eligible supplies inventories and, in each case, subject to specified advance rates. The borrowing base is subject to

Coronado Global Resources Inc. Form 10-K December 31, 2021 151


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

certain reserves, which may be established by the agent in its reasonable credit discretion, that could reasonably be expected to have an adverse effect on the value of the collateral included in the borrowing base.

Borrowings under the ABL Facility bear interest at a rate equal to a BBSY rate plus an applicable margin. In addition to paying interest on the outstanding borrowings under the ABL Facility, the Company is also required to pay a fee in respect of unutilized commitments, on amounts available to be drawn under outstanding letters of credit and certain administrative fees.

The obligations of the borrowers under the ABL Facility are guaranteed by (a) a first priority-lien in the ABL Collateral, (b) a second priority-lien in the Notes Collateral and (c) solely in the case of the obligations of the Australian Borrower, a featherweight floating security interest over certain accounts released from the security by the Australian Borrower in favor of Stanwell.

The ABL Facility contains customary covenants for asset-based credit agreements of this type, including, among others: (i) the requirement to deliver financial statements, other reports and notices; (ii) covenants related to the payment of dividends on, or purchase or redemption of, capital stock; (iii) covenants related to the incurrence or prepayment of certain debt; (iv) covenants related to the incurrence of liens or encumbrances; (v) compliance with laws; (vi) restrictions on certain mergers, consolidations and asset dispositions; and (vii) restrictions on certain transactions with affiliates. Subject to customary grace periods and notice requirements, the ABL Facility also contains customary events of default. Additionally, the ABL Facility contains a springing fixed charge coverage ratio of not less than 1.00 to 1.00, which ratio is tested if availability under the ABL Facility is less than a certain amount. As of December 31, 2021, the Company is not subject to this covenant. As at December 31, 2021, the Company met its undertakings under the ABL Facility.

To establish the ABL Facility, the Company incurred debt issuance costs of $5.4 million. The Company has elected an accounting policy to present debt issuance costs incurred before the debt liability is recognized (e.g., before the debt proceeds are received) as an asset which will be amortized ratably over the term of the line-of-credit and have been included in “Interest expense, net” in the Company’s Consolidated Statements of Operations and Comprehensive Income. The costs will not be subsequently reclassified as a direct deduction of the liability. At December 31, 2021, issuance costs incurred to establish the ABL Facility have been classified in “Other non-current assets” in the Company’s Consolidated Balance Sheet. Refer to Note 13 “Other Assets”.

As at December 31, 2021, no amounts were drawn and no letters of credit were outstanding under the ABL Facility.

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 152


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

 

18. Other Financial Liabilities

 

The following is a summary of other financial liabilities at December 31, 2021:

(US$ thousands)

 

Principal

Collateralized financial liabilities payable to third-party financing companies(1)

 

$

17,794

Unsecured notes payable to insurance premium finance company, payable in aggregate monthly instalments ranging from $645 to $700 with a fixed rate ranging up to 2.25% per annum

 

 

4,536

Total Other financial liabilities

 

 

22,330

Less: current portion

 

 

8,508

Other non-current financial liabilities

 

$

13,822

 

(1) On January 6, 2021, the Company entered into an agreement with a third-party financier to sell and leaseback items of property, plant and equipment owned by Curragh, a wholly-owned subsidiary of the Company. The transaction did not satisfy the sale criteria under ASC 606 – Revenues from Contracts with Customers. As a result, the transaction was deemed a financing arrangement and the Company has continued to recognize the underlying property, plant and equipment on its Consolidated Balance Sheet. The proceeds received from the transaction of $23.5 million (A$30.2 million) were recognized as “Other financial liabilities” on the Consolidated Balance Sheet. The term of the financing arrangement ranges up to five years with an implied interest rate of up to 7.8% per annum. The carrying amount of this financial liability, net of issuance costs, was $17.8 million as at December 30, 2021, $4.0 million of which is classified as a current liability.

The following is a summary of other financial liabilities at December 31, 2020:

(US$ thousands)

 

Principal

Collateralized notes payable to equipment financing companies, payable in aggregate monthly instalments ranging from $6 to $124 through September 19, 2021. Interest is payable at fixed rates ranging up to 5.5% per annum

 

$

162

Unsecured notes payable to insurance premium finance company, payable in aggregate monthly instalments ranging from $474 to $543 with a fixed rate ranging up to 2.80% per annum

 

 

4,069

Other current financial liabilities

 

 

4,231

Derivative liability (2)

 

 

2,898

Total other current liabilities

 

 

7,129

Less: current portion

 

 

7,129

Other non-current financial liabilities

 

$

—

(2) Refer to Note 25(a) “Derivatives” for further disclosure.

 

19. Contract Obligations

In connection with the acquisition of the Logan assets, the Company assumed certain non-market contracts related to various coal leases. The non-market coal leases require royalty payments based on a percentage of the realization from the sale of the respective coal under lease. The Company recorded $27.3 million related to the non-market portion of the coal leases and is amortizing it ratably over the respective estimated coal reserves as they are mined and sold.

In connection with the acquisition of Curragh, the Company assumed the Stanwell non-market coal supply agreement (CSA) with a fixed pricing component that was effectively below the market price at the date of acquisition. The Company recorded $307.0 million related to the unfavorable pricing of the Stanwell CSA and is amortizing it ratably based on the tons sold through the contract. The amortization of this liability for the year ended December 31, 2021 and 2020 were $33.7 million and $32.6 million, respectively, and was recorded as “Other revenues” in the Consolidated Statements of Operations and Comprehensive Income.

Coronado Global Resources Inc. Form 10-K December 31, 2021 153


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

 

The following is a summary of the contract obligations as of December 31, 2021:

(US$ thousands)

 

Short-term

 

Long-term

 

Total

Coal leases contract liability

 

$

843

 

 

20,081

 

 

20,924

Stanwell below market coal supply agreement

 

 

39,118

 

 

121,107

 

 

160,225

 

 

$

39,961

 

 

141,188

 

 

181,149

The following is a summary of the contract obligations as of December 31, 2020:

(US$ thousands)

 

Short-term

 

Long-term

 

Total

Coal leases contract liability

 

 

843

 

 

20,667

 

 

21,510

Stanwell below market coal supply agreement

 

 

39,452

 

 

165,156

 

 

204,608

 

 

$

40,295

 

 

185,823

 

 

226,118

 

20. Deferred Consideration Liability

On August 14, 2018 the Company completed the purchase of the Stanwell Reserved Area, or the SRA, adjacent to the current Curragh mining tenements. This area was acquired on a deferred consideration basis and on acquisition the Company recognized a “Mineral rights and reserves” and a corresponding deferred consideration liability of $155.2 million (A$210.0 million), calculated using the contractual pre-tax discount rate of 13% representing fair value of the arrangements at the date of acquisition. The deferred consideration liability will reflect passage of time changes by way of an annual accretion at the contractual pre-tax discount rate of 13% and will be settled as a discount to the price of thermal coal supplied to Stanwell over the term of a new coal supply agreement which is expected to commence in 2027. The accretion of deferred consideration is recognized in “Interest expense, net” in the Consolidated Statements of Operations and Comprehensive Income. The Right-to-mine-asset will be amortized over the coal reserves mined from the SRA.

 

 

December 31,

(US$ thousands)

 

2021

 

2020

Stanwell Reserved Area deferred consideration

 

$

230,492

 

$

216,513

 

 

$

230,492

 

$

216,513

 

21. Workers’ Compensation and Pneumoconiosis (“Black Lung”) Obligations

In the United States, coal mine operations generate traumatic workers compensation claims, as well as workers’ compensation occupational disease claims for black lung disease. Injured workers generally file claims for traumatic injury under the governing state workers compensation act. Workers may file claims due to black lung under the governing state workers compensation act or under a series of federal laws that include the Federal Coal Mine Health and Safety Act of 1969, as amended, the Black Lung Benefits Act of 1973, and the Black Lung Benefits Reform Act of 1977. The Company provides for both traumatic workers compensation claims and occupational disease claims through an insurance policy.

The Company obtained workers compensation insurance for work related injuries, including black lung, through a third-party commercial insurance company for the years ended December 31, 2021, 2020 and 2019. The insurance policy covers claims that exceed $0.5 million per occurrence for all years, or aggregate claims in excess of $22.0 million, $15.0 million and $17.0 million for policy years ending May 2022, May 2021 and May 2020. Per the contractual agreements, the Company was required to provide a collateral deposit of $41.1 million for policy years 2017 through 2022 ending to May 31, 2022, which is accomplished through providing a combination of letters of credit and cash collateral in an escrow account. As of December 31, 2021, the Company has provided $16.8 million of letters of credit and $21.0 million of cash collateral totaling $37.8 million. The remaining collateral is required to be provided by March 31, 2022.

For the years ended December 31, 2021, 2020 and 2019, the audited Consolidated Statements of Operations and Comprehensive Income included Company incurred claims, premium expenses and administrative fees related to worker’s compensation benefits of $12.2 million, $9.5 million and $13.8 million, respectively. As of December 31, 2021 and 2020, the estimated workers’ compensation liability was $29.7 million and $24.4 million, respectively, representing claims incurred but not paid based on the estimate of the outstanding claims under the coverage limits and the actuarially determined retained liability under the aggregate claim amount. As of December 31, 2021 and 2020, $25.3 million and $21.8 million, respectively, are recorded within “Other non-current liabilities” in the Consolidated Balance Sheets. The current portion of the Company’s estimated workers’ compensation liabilities are recorded within “Accrued expenses and other current liabilities” in the Consolidated Balance Sheets.

Coronado Global Resources Inc. Form 10-K December 31, 2021 154


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

 

22. Employee Benefit Plans

The Company has a 401(k)-defined contribution plan in which all U.S. full time employees are eligible to participate upon their date of hire. Employees generally may contribute up to 100% of their qualifying compensation subject to statutory limitations. The Company matches up to 100% up to the first 4% of the participant’s annual compensation for all employees except for those employed at Buchanan. For employees at Buchanan, the Company matches up to 100% of the first 6% of the participant’s annual compensation. The Company’s contributions immediately vest. Total Company contributions for the years ended December 31, 2021, 2020 and 2019 amounted to $3.3 million, $2.7 million and $3.3 million, respectively.

In the United States, the Company is self-insured for employee health care claims up to the lesser of $0.2 million per covered person or an aggregate amount depending on the various coverages provided to employees throughout the plan year for all employees. The Company has purchased coverage from a commercial insurance carrier to provide for any claims in excess of these amounts. At December 31, 2021 and 2020, the Company had provided accruals of $1.7 million and $1.6 million, respectively, for claims incurred but not paid based on management’s estimate of the Company’s self-insured liability. For the years ended December 31, 2021, 2020 and 2019, the Company incurred claims, premium expenses and administrative fees related to this plan totaling $25.8 million, $23.9 million and $28.0 million respectively.

 

23.Share-Based Compensation

 

Total stock-based compensation expense was $0.5 million, $1.6 million and $0.3 for the years ended December 31, 2021, 2020 and 2019 respectively, and was included as a component of selling, general, and administrative expenses in the Company’s Consolidated Statements of Operations and Comprehensive Income. The stock-based compensation expense includes compensation expense recognized in full at the grant date for employees that meet certain retirement eligibility criteria per the 2018 Plan (as defined below).

As of December 31, 2021, the Company had $1.1 million of total unrecognized compensation cost related to nonvested stock-based compensation awards granted under the plans. This cost is expected to be recognized over a weighted-average period of 1.25 years for the 2018 grant, 2.25 years for the 2020 grant and 3.25 years for the 2021 grant as stock-based compensation expense. This expected cost does not include the impact of any future stock-based compensation awards.

 

(a) 2018 Equity Incentive Plan

In connection with the completion of the Company’s initial public offering of common stock, the Company implemented the Coronado Global Resources Inc. 2018 Equity Incentive Plan, or the 2018 Plan, which is designed to align compensation for certain key executives with the performance of the Company. Since its approval, there have been no updates to the 2018 Plan or issuance of a new plan.

The 2018 Plan provides for the grant of awards including stock options, or Options; stock appreciation rights; restricted stock units, or RSUs; and restricted stock, valued in whole or in part with reference to shares of the Company’s CDIs or common stock, as well as performance-based awards, including performance stock units, or PSUs, denominated in CDIs or shares of common stock. The Company has granted Options, RSUs and PSUs, all in CDIs with 10 CDIs representing 1 share of common stock.

The Company measures the cost of all stock-based compensation, including stock options, at fair value on the grant date and recognizes such costs within “Selling, general and administrative expense” in the Consolidated Statements of Operations and Comprehensive Income. The Company recognizes compensation expense related to Options and PSUs that cliff vest using the straight-line method during the requisite service period. For stock-based awards where vesting is dependent upon achieving certain operating performance goals, the Company estimates the likelihood of achieving the performance goals during the performance period. The Company accounts for forfeitures as and when they occur.

All awards require the grantee to be employed by the Company at either the vesting date or settlement date except for grantees who meet certain retirement criteria under the 2018 Plan.

As of December 31, 2021, the following awards were granted under the 2018 Plan:

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 155


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

Grant year

 

Vesting date

 

Performance period

 

Stock Options

 

PSUs

2021

 

31/03/2025

 

01/01/2021 - 31/12/2023

 

-

 

5,998,212

2020

 

31/03/2024

 

01/01/2020 - 31/12/2022

 

-

 

3,203,988

2018

 

31/03/2023

 

01/01/2019 - 31/12/2021

 

1,336,454

 

1,001,914

 

 

Relative TSR Awards: For the Options and PSUs granted, the Company included a relative total shareowner return, or TSR, modifier to determine the number of shares which will vest at the end of the performance period. The TSR is deemed a market condition under Financial Accounting Standard Board Codification Topic “Compensation – Stock Compensation”, or FASB Topic 718. These awards are determined based on the Company’s percentile ranking of TSR over the performance period relative to a predefined comparator group of companies. For 55.56% of the PSUs granted in 2021 and 2020 and 25% of Options and PSUs granted in 2018 that will vest, will be determined based on TSR.

Awards subject to TSR vest based on service and market conditions. The fair value of relative TSR was estimated on the grant date using a Monte Carlo simulation model.

Scorecard Awards: The number of Options and PSUs, that will ultimately vest is based on the certified achievement of predefined scorecard performance metrics, or the Scorecard. The Scorecard are deemed a performance condition under FASB Topic 718. For 44.44% of the PSUs granted in 2021 and 2020 the number of awards that will ultimately vest will be determined based on the Scorecard relating to safety and cash flow. For 75% of Options and PSUs granted in 2018 that will ultimately vest will be determined based on the Scorecard relating to safety, production volumes and production costs.

Awards subject to Scorecard vest based on service and performance conditions. The fair value of the Options Scorecard was estimated on the grant date using a Black-Sholes-Merton option-pricing model.

Performance metrics applicable to the awards granted as summarized below:

 

Grant year

 

Relative TSR

 

Scorecard

 

 

TSR

 

Safety

 

TSR

 

Cashflow

 

Production

 

Production costs

2021 and 2020

 

33.0%

 

22.0%

 

22.0%

 

22.0%

 

-

 

-

2018

 

25.0%

 

25.0%

 

-

 

-

 

25.0%

 

25.0%

 

Stock Option Awards

The Company’s 2018 stock option awards were granted on the date of the IPO with an exercise price of $2.84 per CDI (A$4.00 per CDI) which was equal to the Company’s IPO Price.

The Company’s Stock Option activity is summarized below:

Stock Option Plan Activity

 

2021

 

2020

 

2019

Opening at the beginning of the year

 

 

1,083,101

 

 

1,292,476

 

 

1,336,454

Granted

 

 

—

 

 

—

 

 

—

Forfeited

 

 

(68,095)

 

 

(209,375)

 

 

(43,978)

Outstanding at the end of the year

 

 

1,015,006

 

 

1,083,101

 

 

1,292,476

Exercisable at the end of the year

 

 

—

 

 

—

 

 

—

 

 

 

 

 

 

 

 

 

 

 

 

2021

 

2020

 

2019

Weighted-average exercise price per CDI (US$)

 

$

2.54

 

$

2.54

 

$

2.54

Weighted-average remaining contractual term (in years)

 

 

1.25

 

 

2.25

 

 

3.25

 

The weighted average grant date fair value of all Option Awards granted was $0.27. On August 5, 2019, the Board of Directors declared and approved return of capital of $0.298 per CDI. In accordance with ASX listing rule clause 7.22.3 the exercise price of option awards granted under 2018 Plan were reduced by the same amount as the return of capital to $2.54. This change was deemed a modification under ASC 718 Compensation – Stock compensation”, however, there was no incremental fair value as a result and as such no change was required to the grant date fair value. No stock option awards vested during the years ended December 31, 2021.

Coronado Global Resources Inc. Form 10-K December 31, 2021 156


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

The assumptions used to determine the Options fair value on grant date were as follows:

 

 

2018 Grant

Expected term of the stock options (in years) (i)

 

 

7.22

Dividend yield (ii)

 

 

10%

Expected volatility (iii)

 

 

35%

Risk-free interest rate (iv)

 

 

2.46%

 

(i)Expected term represents the period that the Company’s stock-based awards are expected to be outstanding and is determined using the simplified method, which equates to a weighted average of the vesting period and total contractual term of the award. All awards cliff vest at the end of the requisite service period.

(ii)Dividend yield is the expected average yield of dividends expected over the vesting period.

(iii)Expected volatility was estimated using comparable public company’s volatility for similar terms as the Company does not have a long enough operating period as a public company to estimate its own volatility. Over time as the Company develops its own volatility history it will begin to incorporate that history into its expected volatility estimates.

(iv)Risk-free interest rate is based on an interpolated Australian Government Bond Rate at the time of the grant for periods corresponding with the expected term of the option.

The applicable assumptions in determining the fair value of market and performance conditions of the Options awards were the same.

Performance Stock Unit Awards

Activity of the Company’s PSUs that are ultimately payable in the Company’s CDI’s or the equivalent number of shares of common stock granted under the 2018 Plan is summarized below:

Performance Stock Units Plan Activity

 

2021

 

2020

 

2019

Nonvested at the beginning of the year

 

 

4,002,783

 

 

988,721

 

 

1,001,914

Granted

 

 

5,998,212

 

 

3,203,988

 

 

—

Forfeited

 

 

(1,499,126)

 

 

(189,926)

 

 

(13,193)

Nonvested at the end of the year

 

 

8,501,869

 

 

4,002,783

 

 

988,721

 

 

 

 

 

 

 

 

 

 

 

 

2021

 

2020

 

2019

Weighted-average grant date fair value (per CDI)

 

$

0.43

 

$

0.79

 

$

1.83

Weighted-average remaining term (in years)

 

 

2.79

 

 

3.01

 

 

3.25

 

The weighted average grant date fair value of all PSU Awards granted in 2021 was $0.33 (A$0.42). No PSUs vested during the year ended December 31, 2021.

The assumptions used to determine the PSUs fair value on each grant date were as follow:

 

 

 

2021 Grant

 

2020 Grant

 

2018 Grant

Time to maturity (in years) (i)

 

 

3.85

 

 

3.49

 

 

4.52

Dividend yield (ii)

 

 

3.0%

 

 

1.6%

 

 

10.0%

Expected volatility (iii)

 

 

60.0%

 

 

60.0%

 

 

35.0%

Risk-free interest rate (iv)

 

 

0.35%

 

 

0.18%

 

 

2.23%

 

(i)Time to maturity represents the period that the Company’s stock-based awards will vest. All awards cliff vest at the end of the requisite service period.

(ii)Dividend yield is the expected average yield of dividends expected over the vesting period.

Coronado Global Resources Inc. Form 10-K December 31, 2021 157


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

(iii)For the 2018 grant, the expected volatility was estimated using comparable public company’s volatility for similar terms as the Company does not have a long enough operating period as a public company to estimate its own volatility. For the 2020 and 2021 grants, the volatility was estimated using comparable public company’s volatility and the Company’s own volatility for similar terms.

(iv)Risk-free interest rate is based on an interpolated Australian Government Bond Rate at the time of the grant for periods corresponding with the expected term of the PSUs.

The above inputs were consistent to determine the fair value of the market and performance conditions of the PSUs awards.

 

(b)Executive Short Term Incentive Plan

The amount of the STI award that each participating executive officer of the Company becomes entitled to each year (if any) will be determined by the Board and Compensation and Nominating Committee based on the achievement of set financial and non-financial performance targets. 50% of the award is to be delivered in cash after the release of the Company’s audited full-year financial results and then 50% will be deferred for 12 months. The deferred component of the STI will be delivered as Restricted Stock Units (“RSUs”) that will vest after the release of the Company’s audited full year results following the year of the award.

Each RSU is an entitlement to receive one CDI (or, if the Board determines, the equivalent value in cash of common shares), plus additional CDIs (or the equivalent value in cash or common shares) equal to any distributions made until the RSU is settled. The RSU’s are granted for nil consideration, as they form part of the participant’s remuneration package.

The CEO is the only Director of the Company who is entitled to participate in the grant of RSUs under deferral arrangements in the STI Plan.

During the year ended December 31, 2020, the Company granted 552,129 RSUs to eligible participants under the 2019 STI Plan. The weighted average grant date fair value of all RSUs granted under this plan was $1.29 (A$1.93) per CDI. These RSUs vested and were settled during the year ended December 31, 2021. No RSUs were granted during the year ended December 31, 2021.

 

24. Income Taxes

On March 27, 2020, the United States Congress enacted the Coronavirus Aid, Relief and Economic Security Act, or CARES Act, to provide certain relief as a result of the COVID-19 outbreak. The CARES Act (PL 116-136), allows for a five-year carryback for losses arising in tax years beginning in 2018, 2019 and 2020.

On April 9, 2021, West Virginia Governor Jim Justice signed into law House Bill 2026, adopting significant changes to the state’s income tax code, including market-based source, single-sales factor apportionment and limitations on temporary or mobile worker withholding. The new law resulted in a tax impact of approximately $1.3 million.

On October 6, 2020, the Australian Government, as part of the 2020–21 Australian Federal Government Budget, announced that it will target support to businesses and encourage new investment through a loss carry back regime. Eligible corporate entities that previously paid corporate income taxes in a relevant year and have subsequently made taxable losses can claim a refundable tax offset up to the amount of their previous income tax liabilities.

The Company received a refund of $12.0 million during the current year for tax losses relating to the 2020 income year which was carried back to 2019 income year. No further tax losses can be carried back.

At December 31, 2021, the Australian Operations has tax losses carried forward of $27.0 million (tax effected), which are indefinite lived and included in deferred tax assets. In addition, a company, which is not part of the Australian tax consolidated group, had tax losses carried forward of $8.1 million (tax effected) for which an equal valuation allowance has been recognized.

Income (loss) from continuing operations before income taxes for the periods presented below consisted of the following:

Coronado Global Resources Inc. Form 10-K December 31, 2021 158


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

 

 

December 31,

(US$ thousands)

 

2021

 

2020

 

2019

U.S.

 

$

226,463

 

 

(116,354)

 

 

138,411

Non-U.S.

 

 

16,062

 

 

(170,199)

 

 

281,747

Total

 

$

242,525

 

 

(286,553)

 

 

420,158

 

Total income tax expense for the periods presented below consisted of the following:

 

 

December 31,

(US$ thousands)

 

2021

 

2020

 

2019

Current:

 

 

 

 

 

 

 

 

 

U.S. federal

 

$

30,075

 

 

(28,959)

 

 

16,518

Non-U.S.

 

 

(4,443)

 

 

(18,967)

 

 

79,228

State

 

 

3,480

 

 

(1,034)

 

 

3,737

Total current

 

 

29,112

 

 

(48,960)

 

 

99,483

Deferred:

 

 

 

 

 

 

 

 

 

U.S. federal

 

 

13,486

 

 

18,353

 

 

3,733

Non-U.S.

 

 

6,658

 

 

(18,757)

 

 

6,030

State

 

 

3,846

 

 

(10,652)

 

 

5,435

Total deferred

 

 

23,990

 

 

(11,056)

 

 

15,198

Total income tax expense

 

$

53,102

 

 

(60,016)

 

 

114,681

The following is a reconciliation of the expected statutory federal income tax expense (benefit) to the Company’s income tax expense (benefit) for the periods presented below:

 

 

December 31,

(US$ thousands)

 

2021

 

2020

 

2019

Current:

 

 

 

 

 

 

 

 

 

Expected income tax expense (benefit) at U.S. federal statutory rate

 

$

50,931

 

 

(60,176)

 

 

88,233

Non-taxable income

 

 

—

 

 

—

 

 

—

Permanent differences

 

 

296

 

 

(3,144)

 

 

3,246

Prior period tax return adjustments and amendments

 

 

(4,259)

 

 

—

 

 

—

Foreign tax deductions method change and prior year amendments

 

 

—

 

 

28,952

 

 

—

Australian branch impact on US taxes

 

 

(1,699)

 

 

(21,398)

 

 

15,956

State income taxes, net of federal benefit

 

 

7,833

 

 

(4,250)

 

 

7,246

Total income tax expense

 

 

53,102

 

 

(60,016)

 

 

114,681

Effective tax rate

 

 

21.9%

 

 

20.9%

 

 

27.3%

Deferred income taxes reflect the net tax effects of temporary differences between the carrying amounts of assets and liabilities for financial reporting purposes and the amount used for income tax purposes using the enacted tax rates and laws currently in effect. Significant components of the Company’s deferred income tax assets and liabilities as of December 31, 2021 were as follows:

Coronado Global Resources Inc. Form 10-K December 31, 2021 159


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

 

 

December 31,

(US$ thousands)

 

2021

 

2020

Deferred income tax assets:

 

 

 

 

 

 

Accruals and provisions

 

$

29,091

 

 

35,523

Contract obligations

 

 

137,290

 

 

157,446

Asset retirement obligation

 

 

40,033

 

 

42,475

Goodwill

 

 

7,057

 

 

7,491

Tax losses

 

 

35,078

 

 

56,340

Interest limitation carried forward

 

 

—

 

 

—

Other

 

 

22,676

 

 

20,286

Gross deferred income tax assets

 

 

271,225

 

 

319,561

Valuation allowance (1)

 

 

(25,590)

 

 

(26,523)

Total deferred income tax assets, net of valuation allowance

 

 

245,635

 

 

293,038

Deferred income tax liabilities:

 

 

 

 

 

 

Property, plant, equipment and mine development, principally due to differences in depreciation, depletion and asset impairments

 

 

(272,219)

 

 

(272,450)

Warehouse stock

 

 

(14,903)

 

 

(15,886)

U.S. liability on foreign deferred taxes

 

 

(10,301)

 

 

(17,254)

Other

 

 

(9,246)

 

 

(27,160)

Total deferred income tax liabilities

 

 

(306,669)

 

 

(332,750)

 

 

 

 

 

 

 

Net deferred income tax liability

 

 

(61,034)

 

 

(39,712)

(1) As of December 31, 2020 and 2021, the Company recorded a valuation allowance against a deferred tax asset of an equal amount which relates predominantly to tax losses, land and goodwill in Australia which is in the Other category in the table. Due to the capital character of these items and the lack of expected capital gains, the Australian group is not expected to realize the benefit of this deferred tax asset.

Unrecognized Tax Benefits

The Company provides for uncertain tax positions, and the related interest and penalties, based upon management’s assessment of whether a tax benefit is more likely than not to be sustained upon examination by tax authorities. To the extent that the anticipated tax outcome of these uncertain tax positions changes, such changes in estimate will impact the income tax provision in the period in which such determination is made. The Company recognizes accrued interest and penalties related to uncertain tax positions as a component of income tax expense.

The Company first recorded unrecognized tax benefits of $14.2 million during the year ended December 31, 2019. During the year ended December 31, 2020, the Company assessed these tax positions and resolved the uncertainty related to those positions. Accordingly, the position of $14.2 million related to the uncertain tax benefits, related to prior periods, was released.

The Company did not enter into any new uncertain tax positions during the year ended December 31, 2020 and 2021, and as a result the Company does not have any recorded uncertain tax positions as of December 31, 2021. The release of uncertain tax positions during the year ended December 31, 2020 did not impact the Company’s provision for income taxes.

We recorded no amounts related to interest and penalties for 2021, 2020 and 2019 and these years remain open to examination by U.S. and Australian tax authorities.

 

25. Derivatives and Fair Value Measurement

(a) Derivatives

The Company may use derivative financial instruments to manage its financial risks in the normal course of operations, including foreign currency risks, commodity price risk related to purchase of raw materials (such as gas or diesel) and interest rate risk. Derivatives for speculative purposes are strictly prohibited under the Treasury Risk Management Policy approved by the Board of Directors.

Coronado Global Resources Inc. Form 10-K December 31, 2021 160


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

The financing counterparties to the derivative contracts potentially expose the Company to credit-related risk. Credit risk is the risk that a third party might fail to fulfill its performance obligations under the terms of the financial instrument. The Company mitigates credit risk by entering into derivative contracts with high credit quality counterparties, limiting the amount of exposure to each counterparty and frequently monitoring their financial condition.

Forward fuel contracts

In 2020, the Company entered into forward derivative contracts to hedge its exposure to diesel fuel that was expected to be used at its Australian Operations during 2021. In connection with the repayment and termination of the SFA, the Company closed out all outstanding forward fuel derivative contracts and received proceeds, representing hedge gain on settlement, of $5.8 million. This hedge gain on settlement was recorded to “Cost of coal revenues” in the Consolidated Statements of Operations and Comprehensive Income, at which point the related hedged transaction impacted income.

No forward fuel derivative contracts were outstanding at December 31, 2021.

 

 

 

 

December 31, 2021

 

December 31, 2020

(US$ thousands)

 

Classification

 

Derivative asset

 

Derivative liability

 

Derivative asset

 

Derivative liability

 

 

Other current financial liabilities

 

—

 

—

 

—

 

2,898

 

 

 

 

—

 

—

 

—

 

2,898

 

 

 

 

 

 

 

 

 

 

 

The following table presents our details of diesel fuel outstanding hedge contracts:

 

 

December 31, 2021

 

December 31, 2020

(in thousands)

 

Notional amount (thousands)

 

Unit of measure

 

Varying maturity dates

 

Notional amount (thousands)

 

Unit of measure

 

Varying maturity dates

Designated forward fuel contracts

 

—

 

—

 

—

 

135,114

 

Liters

 

January 2021 – December 2021

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fair Value of Financial Instruments

The fair value of a financial instrument is the amount that will be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. The fair values of financial instruments involve uncertainty and cannot be determined with precision.

The Company utilizes valuation techniques that maximize the use of observable inputs and minimize the use of unobservable inputs to the extent possible. The Company determines fair value based on assumptions that market participants would use in pricing an asset or liability in the market. When considering market participant assumptions in fair value measurements, the following fair value hierarchy distinguishes between observable and unobservable inputs, which are categorized in one of the following levels:

Level 1 Inputs: Unadjusted quoted prices in active markets for identical assets or liabilities accessible to the reporting entity at the measurement date.

Level 2 Inputs: Other than quoted prices that are observable for the asset or liability, either directly or indirectly, for substantially the full term of the asset or liability.

Level 3 Inputs: Unobservable inputs for the asset or liability used to measure fair value to the extent that observable inputs are not available, thereby allowing for situations in which there is little, if any, market activity for the asset or liability at measurement date.

Financial Instruments Measured on a Recurring Basis

As of December 31, 2021, there were no financial instruments required to be measured at fair value on a recurring basis.

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 161


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

The Company’s net financial liability positions for which fair value is measured on a recurring basis as of December 31, 2020 was as follows:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Assets/(Liabilities)

(US$ thousands)

 

Level 1

 

Level 2

 

Level 3

 

Total

Forward commodity contracts

 

$

—

 

$

(2,898)

 

$

—

 

$

(2,898)

 

 

$

—

 

$

(2,898)

 

$

—

 

$

(2,898)

 

Other Financial Instruments

The following methods and assumptions are used to estimate the fair value of other financial instruments as of December 31, 2021 and 2020:

•Cash and restricted cash, accounts receivable, accounts payable, accrued expenses, lease liabilities and other current financial liabilities: The carrying amounts reported in the Consolidated Balance Sheets approximate fair value due to the short maturity of these instruments.

•Restricted deposits, lease liabilities, interest bearing liabilities and other financial liabilities: The fair values approximate the carrying amounts reported in the Consolidated Balance Sheets.

•Interest bearing liabilities: The Company’s outstanding interest-bearing liabilities are carried at amortized cost. As of December 31, 2021, there were no borrowings outstanding under the ABL Facility. The estimated fair value of the Notes is approximately $340.2 million based upon observable market data (Level 2).

Other than the estimated fair values of the Greenbrier mining asset held for sale described in Note 4 “Assets Held for Sale” and Note 5 “Impairment of Assets”, which are level 3 fair value measurements, there are no other fair value measurements of assets and liabilities that are measured at fair value on a nonrecurring basis as of December 31, 2021 and December 31, 2020.

 

26. Accumulated Other Comprehensive Losses

The Company’s Accumulated Other Comprehensive Losses consists of foreign currency translation adjustment from subsidiaries not using the U.S. dollar as their functional currency and net gains or losses on certain derivatives instruments accounted for as cash flow hedges.

Coronado Global Resources Inc. Form 10-K December 31, 2021 162


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

 

 

 

 

 

 

Net unrealized gain (loss)

 

 

 

(US$ thousands)

 

 

Foreign currency translation adjustments

 

 

Cash flow fuel hedges

 

 

Cash flow foreign currency hedges

 

 

Total

Balance at December 31, 2019

 

$

(48,265)

 

$

2,378

 

$

681

 

$

(45,206)

Net current-period other comprehensive income (loss):

 

 

 

 

 

 

 

 

 

 

 

 

Loss in other comprehensive income (loss) before reclassifications

 

 

(11,204)

 

 

(26,661)

 

 

(1,424)

 

 

(39,289)

Gain on long-term intra-entity foreign currency transactions

 

 

32,692

 

 

—

 

 

—

 

 

32,692

Loss reclassified from accumulated other comprehensive income (loss)

 

 

—

 

 

20,432

 

 

457

 

 

20,889

Tax effects

 

 

—

 

 

1,822

 

 

286

 

 

2,108

Total net current-period other comprehensive income (loss)

 

 

21,488

 

 

(4,407)

 

 

(681)

 

 

16,400

Balance at December 31, 2020

 

 

(26,777)

 

 

(2,029)

 

 

—

 

 

(28,806)

Net current-period other comprehensive income (loss):

 

 

 

 

 

 

 

 

 

 

 

 

Gain in other comprehensive income (loss) before reclassifications

 

 

6,991

 

 

9,922

 

 

—

 

 

16,913

Loss on long-term intra-entity foreign currency transactions

 

 

(24,442)

 

 

—

 

 

—

 

 

(24,442)

Gain reclassified from accumulated other comprehensive income (loss)

 

 

—

 

 

(7,023)

 

 

—

 

 

(7,023)

Tax effects

 

 

—

 

 

(870)

 

 

—

 

 

(870)

Total net current-period other comprehensive income (loss)

 

 

(17,451)

 

 

2,029

 

 

—

 

 

(15,422)

Balance at December 31, 2021

 

$

(44,228)

 

$

—

 

$

—

 

$

(44,228)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

27. Commitments

(a) Mineral Leases

The Company leases mineral interests and surface rights from land owners under various terms and royalty rates. The future minimum royalties under these leases are as follows:

(US$ thousands)

 

 

 

 

Amount

Year ending December 31,

 

 

 

 

 

2022

 

 

 

$

6,354

2023

 

 

 

 

5,478

2024

 

 

 

 

5,407

2025

 

 

 

 

5,233

2026

 

 

 

 

5,158

Thereafter

 

 

 

 

25,877

Total

 

 

 

$

53,507

 

 

 

 

 

 

Mineral leases are not in scope of ASC 842 and continue to be accounted for under the guidance in ASC 932, Extractive Activities – Mining.

 

 

 

 

 

 

(b) Other commitments

As of December 31, 2021, purchase commitments for capital expenditures were $24.1 million, all of which is obligated within the next 12 months.

In Australia, the Company has generally secured the ability to transport coal through rail contracts and coal export terminal contracts that are primarily funded through take-or-pay arrangements with terms ranging up to 9 years.

Coronado Global Resources Inc. Form 10-K December 31, 2021 163


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

In the U.S., the Company typically negotiates its rail and coal terminal on an annual basis. As of December 31, 2021, these Australian and U.S. commitments under take-or-pay arrangements totaled $1.2 billion, of which approximately $115.8 million is obligated within the next year, $225.1 million within 1-3 years, $228.2 million 3-5 years and $614.3 million thereafter.

28. Contingencies

In the normal course of business, the Company is a party to certain guarantees and financial instruments with contingent liabilities, such as letters of credit and performance or surety bonds. No liabilities related to these arrangements are reflected in the Company’s Consolidated Balance Sheets. Management does not expect any material losses to result from these guarantees or off-balance sheet financial instruments.

At December 31, 2021, the Company had outstanding bank guarantees of $45.8 million to secure various obligations and commitments.

Restricted deposits represent cash deposits held at third parties as required by certain agreements entered into by the Company to provide cash collateral. The Company had cash collateral in the form of deposits in the amount of $81.0 million and $8.4 million as of December 31, 2021 and 2020, respectively, to provide back-to-back support for bank guarantees, financial payments and other performance obligations and various other operating agreements. These deposits are restricted and classified as long-term assets in the Consolidated Balance Sheets.

In accordance with the terms of the ABL Facility, the Company may be required to cash collateralize the ABL Facility to the extent of outstanding letters of credit after the expiration or termination date of such letter of credit. As of December 31, 2021, no letter of credit was outstanding and no cash collateral was required.

For the U.S. Operations in order to provide the required financial assurance, the Company generally uses surety bonds for post-mining reclamation. The Company can also use bank letters of credit to collateralize certain other obligations. As of December 31, 2021, the Company had outstanding surety bonds of $29.6 million and letters of credit of $16.8 million issued from our available bank guarantees, to secure various obligations and commitments. Future regulatory changes relating to these obligations could result in increase obligations, additional costs or additional collateral requirements.

From time to time, the Company becomes a party to other legal proceedings in the ordinary course of business in Australia, the U.S. and other countries where the Company does business. Based on current information, the Company believes that such other pending or threatened proceedings are likely to be resolved without a material adverse effect on its financial condition, results of operations or cash flows. In management’s opinion, the Company is not currently involved in any legal proceedings, which individually or in the aggregate could have a material effect on the financial condition, results of operations and/or liquidity of the Company.

 

29. Related‑Party Transactions

Xcoal

On May 27, 2021, Xcoal ceased to be a related party after Xcoal’s founder, chief executive officer and chief marketing officer, Mr. Ernie Thrasher, retired as a non-executive director of the Company. Refer to Note 8 “Trade and related party receivables” for transactions, balances and other details relating to Xcoal.

The Energy & Mineral Group

On May 12, 2021, affiliates of The Energy & Minerals Group, or EMG, which is the Company’s controlling stockholder through its ownership of Coronado Group LLC, participated in the Notes Offering and purchased $65.0 million aggregate principal amount of Notes at the closing of the Notes Offering. Following the redemption of Notes on November 16, 2021, the principal amount of Notes held by EMG reduced to $58.5 million and remained unchanged as at December 31, 2021. At December 31, 2021, interest payable to affiliates of EMG on the Notes was $0.8 million and was recorded within “Accrued expenses and other current liabilities” in the Consolidated Balance Sheet. Interest expense to affiliates of EMG were $4.7 million for the year ended December 31, 2021, and recorded in “Interest expense, net” in the Consolidated Statement of Operations and Comprehensive Income.

Coronado Global Resources Inc. Form 10-K December 31, 2021 164


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

Coronado Group LLC

Under the Coronado Group LLC agreement (as amended, effective October 23, 2018), 2,900 management incentive units were designated and authorized for issuance to certain members of management to motivate and retain senior management. The plan is designated to allow key members of management to share in the profits of the Company after certain returns are achieved by the equity investors. The incentive units constitute “profit interests” for the benefit of senior management in consideration of services rendered and to be rendered.

Coronado Coal LLC and Coronado II LLC merged to form Coronado Group LLC in July 2015. Coronado IV LLC was merged into Coronado Group LLC, the Company’s controlling stockholder, on June 30, 2016. Under the updated formation agreement dated June 30, 2016, the 2,500 designated and authorized units under the initial formation of Coronado Group LLC were replaced by these new units. At December 31, 2021 and 2020, 2,900 management incentive units were outstanding.

The incentive units are comprised of three tiers, which entitle the holders to receive distributions from Coronado Group LLC subordinate to the distributions to be received by Members. As of December 31, 2021 and 2020, a portion of the authorized units have been allocated to various members of the Company’s management including Mr. Garold Spindler, CEO, who is also member of Coronado Group LLC.

JEP

JEP Mining LLC (“JEP”) was formed in 2013 between Greenbrier and SYR Energy Partners LP (“SYR”). Greenbrier contributed $0.07 million for 50% ownership and SYR contributed $0.07 million for 50% ownership in JEP (collectively the Membership Interests). JEP is governed by three Managers, two of which are appointed by Greenbrier and one is appointed by SYR.

In connection with the JEP Variable Interest Entity, the Company issued a note receivable to their partner in JEP, SYR in 2013. The note provides additional capital to SYR to aid them in funding JEP. As of December 31, 2020, the note had a balance of $0.6 million with related interest receivable of $0.2 million. These balances are included in related party receivables.

During the year ended December 31, 2021, the Company acquired the remaining 50% non-controlling interest on JEP, which became a wholly-owned subsidiary.

As of December 31, 2021, the Company consolidates the financial statements of JEP and all intercompany balances and transactions have been eliminated in consolidation.

Stockholder’s Agreement and Registration Rights and Sell-Down Agreement

As of December 31, 2021, Coronado Group LLC has beneficial ownership in the aggregate of 50.4% of the Company’s Shares. On September 24, 2018, Coronado Group LLC and the Company entered into a Stockholder’s Agreement and a Registration Rights and Sell-Down Agreement which governs the relationship between Coronado Group LLC and the Company while the EMG Group beneficially owns in the aggregate at least 50% of our outstanding shares of common stock (including shares of common stock underlying CDIs), including certain governance matters relating to the Company. Under this Agreement, Coronado Group LLC has the ability to require the Company to register its shares under the US Securities Exchange Act of 1934 and to provide assistance to Coronado Group LLC in selling some or all of its shares (including in the form of CDIs).

The Stockholder’s Agreement provides for the following:

•Consent rights: Coronado Group LLC (or its successors or permitted assigns) will have certain consent rights, whereby pre-agreed actions require approval by Coronado Group LLC prior to these actions being undertaken;

•Provision of information to Coronado Group LLC: There will be ongoing information sharing arrangements relating to the provision of financial and other information by the Company and its subsidiaries to Coronado Group LLC group entities and cooperation and assistance between the parties in connection with any financing (or refinancing) undertaken by the Company;

Coronado Global Resources Inc. Form 10-K December 31, 2021 165


Table of Contents

 

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued)

•Pro rata issuances: While Coronado Group LLC Group entities beneficially own in the aggregate at least 10% of the outstanding Shares, unless Coronado Group LLC (or its successors or permitted assigns) agrees otherwise, issuances of equity securities must have been offered to Coronado Group LLC in respect of its pro rata shares and any equity securities to be allocated by the Company under a share incentive plan will be sourced by purchasing them in the market rather than by issuing them; and

•Board rights: Certain rights regarding the board including the right, but not the obligation, to designate the Directors to be included in the membership of any board committee, except to the extent that such membership would violate applicable securities laws or stock exchange or stock market rules.

Relationship Deed

On September 24, 2018, the Company and Coronado Group LLC entered into a Relationship Deed under which the Company provides a number of indemnities in favor of Coronado Group LLC, including in relation to certain Australian IPO-related matters and also certain guarantees that have in the past been provided or arranged by Coronado Group LLC and its affiliates in support of Company obligations. Under the Relationship Deed, Coronado Group LLC also agrees to indemnify the Company in relation to certain Australian IPO-related matters and reimburse certain costs.

Coronado Global Resources Inc. Form 10-K December 31, 2021 166


Table of Contents

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

 

To the Shareholders and the Board of Directors of Coronado Global Resources Inc.

Opinion on the Financial Statements

We have audited the accompanying consolidated balance sheets of Coronado Global Resources Inc. (the Company) as of December 31, 2021 and 2020, the related consolidated statements of operations and comprehensive income, stockholders’ equity and cash flows for each of the two years in the period ended December 31, 2021, and the related notes (collectively referred to as the “consolidated financial statements”). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of the Company at December 31, 2021 and 2020, and the results of its operations and its cash flows for each of the two years in the period ended December 31, 2021, in conformity with U.S. generally accepted accounting principles.

 

We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the Company's internal control over financial reporting as of December 31, 2021, based on criteria established in Internal Control-Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (2013 framework) and our report dated February 22, 2022 expressed an unqualified opinion thereon.

Basis for Opinion

These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on the Company’s financial statements based on our audits. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

 

We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement, whether due to error or fraud. Our audits included performing procedures to assess the risks of material misstatement of the financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the financial statements. We believe that our audits provide a reasonable basis for our opinion.

 

Critical Audit Matter

The critical audit matter communicated below is a matter arising from the current period audit of the financial statements that was communicated or required to be communicated to the audit committee and that: (1) relates to accounts or disclosures that are material to the financial statements and (2) involved our especially challenging, subjective, or complex judgments. The communication of the critical audit matter does not alter in any way our opinion on the consolidated financial statements, taken as a whole, and we are not, by communicating the critical audit matter below, providing a separate opinion on the critical audit matter or on the accounts or disclosures to which it relates.

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 167


Table of Contents

 

Realizability of deferred tax assets related to tax losses

Description of the matter

 

As disclosed in Note 24 to the consolidated financial statements, the Company recognized gross deferred tax assets of $271.2 million at December 31, 2021, which includes a deferred tax asset of $35.1 million related to tax losses carried forward from prior periods.

 

Management’s analysis of the realizability of the tax benefit of the tax losses involves judgment around the Company’s ability to utilize the tax benefit in future periods, which depends on the Company’s future profitability in the jurisdictions in which it operates. Management assesses the Company’s future profitability using profit and taxable income forecasts, which are sensitive to future coal prices, among other assumptions.

 

Auditing the realizability of the deferred tax assets related to tax losses was complex and involved auditor judgment, due to the high degree of estimation uncertainty in forecasting the future profitability for each jurisdiction, particularly given the potential volatility of future coal prices and the wide range of results that can result from such volatility.

 

How we addressed the matter in our audit

 

We obtained an understanding, evaluated the design and tested the operating effectiveness of controls over the Company’s process to evaluate the profit and taxable income forecasts for each jurisdiction. This included controls over management’s selection of future coal prices used in the forecasts.

 

Our testing procedures included, amongst others, evaluating the significant assumptions used and testing the completeness and accuracy of the underlying data in the profit and taxable income forecasts. As part of our testing of the significant assumptions, with the assistance of our valuation specialists, we evaluated the future coal prices used in the Company’s profit forecasts, by comparing those price assumptions to analysts’ and broker forecasts and those used by other market participants. We also performed scenario testing on the impact of different future coal prices on the timing of the utilization of tax losses.

 

 

 

 

/s/ Ernst & Young

 

We have served as the Company’s auditor since 2020.

 

 

Brisbane, Australia

February 22, 2022

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 168


Table of Contents

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Board of Directors
Coronado Global Resources Inc.:

Opinion on the Consolidated Financial Statements

We have audited the accompanying consolidated statements of operations and comprehensive income, stockholders’ equity, and cash flows of Coronado Global Resources Inc. and subsidiaries (the Company) for the year ended December 31, 2019, and the related notes (collectively, the consolidated financial statements). In our opinion, the consolidated financial statements present fairly, in all material respects, the results of operations of the Company and its cash flows for the year ended December 31, 2019, in conformity with U.S. generally accepted accounting principles.

Basis for Opinion

These consolidated financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on these consolidated financial statements based on our audit. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) (PCAOB) and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audit in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud. Our audit included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audit also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. We believe that our audit provides a reasonable basis for our opinion.

 

/s/ KPMG LLP

We served as the Company’s auditor from 2013 to 2019.

Richmond, Virginia
February 24, 2020, except as to note 3,

which is as of February 25, 2021

 

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 169


Table of Contents

 

ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE.

None.

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 170


Table of Contents

 

item 9A. Controls and Procedures

Disclosure Controls and Procedures

We are subject to the periodic reporting requirements of the Exchange Act. We have designed our disclosure controls and procedures to provide reasonable assurance that information we disclose in reports we file or submit under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in the rules and forms of the SEC. Disclosure controls and procedures are controls and procedures that are designed to ensure that information required to be disclosed in our reports filed under the Exchange Act is recorded, processed, summarized and reported, within the time periods specified in the SEC’s rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by our company in the reports that it files or submits under the Exchange Act is accumulated and communicated to our management, including its principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.

The Company, under the supervision and with the participation of its management, including the Chief Executive Officer and the Group Chief Financial Officer, evaluated the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as defined in Rules 13a-15(e) under the Exchange Act) as of the end of the period covered by this report, and concluded that such disclosure controls and procedures were effective to provide reasonable assurance that the desired control objectives were achieved.

Changes to Internal Control over Financial Reporting

There have been no changes in our internal control over financial reporting or in other factors that occurred during our last fiscal quarter that have materially affected, or are reasonably likely to materially affect, our internal controls over financial reporting.

Management’s Report on Internal Control Over Financial Reporting

Our management is responsible for establishing and maintaining adequate internal control over financial reporting as defined in Rules 13a-15(f) under the Exchange Act. Internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of the Company’s consolidated financial statements for external purposes in accordance with generally accepted accounting principles.

Internal control over financial reporting includes those policies and procedures that (i) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the Company; (ii) provide reasonable assurance that transactions are recorded as necessary to permit the preparation of the consolidated financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the Company are being made only in accordance with appropriate authorizations of management and directors of the Company; and (iii) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of the Company’s assets that could have a material effect on the consolidated financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

Management conducted an assessment of the Company’s internal control over financial reporting as of December 31, 2021, using the framework specified in Internal Control – Integrated Framework (2013), published by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Based on this assessment, management concluded that the Company’s internal control over financial reporting was effective as of December 31, 2021.

Our Independent Registered Public Accounting Firm, Ernst & Young, has audited our internal control over financial reporting, as stated in their unqualified opinion report included herein.

Coronado Global Resources Inc. Form 10-K December 31, 2021 171


Table of Contents

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Shareholders and the Board of Directors of Coronado Global Resources, Inc.

Opinion on Internal Control Over Financial Reporting

We have audited Coronado Global Resources Inc.’s internal control over financial reporting as of December 31, 2021, based on criteria established in Internal Control—Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (2013 framework) (the COSO criteria). In our opinion, Coronado Global Resources Inc. (the Company) maintained, in all material respects, effective internal control over financial reporting as of December 31, 2021, based on the COSO criteria.

We also have audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the consolidated balance sheets of the Company as of December 31, 2021 and 2020, the related consolidated statements of operations and comprehensive income, stockholders’ equity and cash flows for each of the two years in the period ended December 31, 2021, and the related notes and our report dated February 22, 2022 expressed an unqualified opinion thereon.

Basis for Opinion

The Company’s management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting included in the accompanying Management’s Report on Internal Control Over Financial Reporting. Our responsibility is to express an opinion on the Company’s internal control over financial reporting based on our audit. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audit in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects.

Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.

Definition and Limitations of Internal Control Over Financial Reporting

A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

/s/ Ernst & Young

 

Brisbane, Australia

February 22, 2022

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 172


Table of Contents

 

ITEM 9B. OTHER INFORMATION

None.

 

 

ITEM 9C. DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS

None.

Coronado Global Resources Inc. Form 10-K December 31, 2021 173


Table of Contents

 

PART III

ITEM 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE.

The information required to be furnished by this Item will be set forth in our definitive proxy statement for the 2022 Annual Meeting of Shareholders, or the Proxy Statement, under the heading “Executive Officers and Corporate Governance”, and is incorporated herein by reference and made a part hereof from the Proxy Statement.

 

ITEM 11. EXECUTIVE COMPENSATION.

The information required to be furnished by this Item will be set forth in the Proxy Statement under the heading “Executive Compensation” and is incorporated herein by reference and made a part hereof from the Proxy Statement.

 

ITEM 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS.

The information required to be furnished by this Item will be set forth in the Proxy Statement under the heading “Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters” and is incorporated herein by reference and made a part hereof from the Proxy Statement.

 

ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE.

The information required to be furnished by this Item will be set forth in the Proxy Statement under the heading “Certain Relationships and Related Transactions” and is incorporated herein by reference and made a part hereof from the Proxy Statement.

 

ITEM 14. PRINCIPAL ACCOUNTING FEES AND SERVICES.

The information required to be furnished by this Item will be set forth in the Proxy Statement under the heading “Ratification of Appointment of Independent Registered Public Accounting Firm” and is incorporated herein by reference and made a part hereof from the Proxy Statement.

Coronado Global Resources Inc. Form 10-K December 31, 2021 174


Table of Contents

 

ITEM 15. EXHIBITS, FINANCIAL STATEMENT SCHEDULES

(a) The following documents are filed as part of this Annual Report:

1. Financial Statements. See index to Financial Statements and Supplementary Data on page 123 of this Annual report on Form 10-K.

2. Financial Statements Schedules. Schedules are omitted because they are not required or applicable, or the required information is included in the Financial Statements or related notes thereto.

3. Exhibits. The exhibits filed with or incorporated by reference as part of this Report are set forth in the Exhibit Index.

(b) The documents listed in the Exhibit Index of this Annual Report on Form 10-K are incorporated by reference or are filed with this Annual Report on Form 10-K, in each case as indicated therein.

 

The following documents are filed as exhibits hereto:

Exhibit No.

Description of Document

2.1*

Share Sale Agreement-Cork, dated as of December 22, 2017, by and among Coronado Australia Holdings Pty Ltd, Coronado Group LLC and Wesfarmers Limited (filed as Exhibit 2.1 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on June 28, 2019 and incorporated herein by reference)

3.1

Amended and Restated Certificate of Incorporation (filed as Exhibit 3.1 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference)

3.2

Amended and Restated Bylaws (filed as Exhibit 3.2 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference)

4.1

Stockholder’s Agreement, dated as of September 24, 2018, by and between the Company and Coronado Group (filed as Exhibit 4.1 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference)

4.2

Registration Rights and Sell-Down Agreement, dated as of September 24, 2018, by and between the Company and Coronado Group (filed as Exhibit 4.2 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference)

4.3

Description of the Company’s securities registered under Section 12 of the Securities Exchange Act of 1934 (filed as Exhibit 4.3 to the Company’s Annual Report on Form 10-K (File No. 000-56044) filed on February 24, 2020 and incorporated herein by reference)

4.4

Indenture, dated as of May 12, 2021, among Coronado Finance Pty Ltd, as issuer, Coronado Global Resources Inc., as guarantor, the subsidiaries of Coronado Global Resources Inc. named therein, as additional guarantors, Wilmington Trust, National Association, as trustee and notes collateral agent (filed as Exhibit 4.1 to the Company’s Current Report on Form 8-K (File No. 000-56044) filed on May 14, 2021 and incorporated herein by reference).

4.5

Form of 10.750% Senior Secured Notes due 2026 (filed as Exhibit 4.2 to the Company’s Current Report on Form 8-K (File No. 000-56044) filed on May 14, 2021 and incorporated herein by reference).

10.1

Relationship Deed, dated as of September 24, 2018, by and among the Company, Coronado Group, certain EMG Group entities and their affiliates (filed as Exhibit 10.1 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference).

Coronado Global Resources Inc. Form 10-K December 31, 2021 175


Table of Contents

 

10.2†‡

Syndicated Facility Agreement, dated as of May 12, 2021, among Coronado Global Resources Inc., as guarantor, Coronado Coal Corporation, as U.S. borrower, Coronado Finance Pty Ltd, as Australian borrower, the subsidiaries of Coronado Global Resources Inc. named therein, as additional guarantors, and Citibank, N.A., as administrative agent and a lender, and various other financial institutions as lenders (filed as Exhibit 10.1 to the Company’s Current Report on Form 8-K (File No. 000-56044) filed on May 14, 2021 and incorporated herein by reference).

10.3‡

Coronado Global Resources Inc. 2019 Short-Term Incentive Plan (filed as Exhibit 10.3 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference)

10.4‡

Coronado Global Resources Inc. 2018 Equity Incentive Plan (filed as Exhibit 10.4 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference)

10.5>‡

Coronado Global Resources Inc. 2018 Non-Executive Director Plan (filed as Exhibit 10.5 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference)

10.6>‡

Employment Agreement dated as of September 21, 2018, by and between Coronado Global Resources Inc. and Garold Spindler (filed as Exhibit 10.6 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference)

10.7>‡

Employment Agreement dated as of July 7, 2020, by and between Curragh Queensland Mining Pty Ltd and Gerhard Ziems (filed as Exhibit 10.1 to the Company’s Current Report on Form 8-K/A (File No. 000-56044) filed on July 7, 2020 and incorporated herein by reference)

10.8>‡

Employment Agreement dated as of August 5, 2021, by and between Coronado Global Resources Inc. and Jeffrey Bitzer (filed as Exhibit 10.1 to the Company’s Current Report on Form 8-K (File No. 000-56044) filed on August 9, 20121 and incorporated herein by reference)

10.9>‡

Contract of Employment dated as of August 4, 2021, by and between Curragh Queensland Mining Pty Ltd and Douglas Thompson (filed as Exhibit 10.2 to the Company’s Current Report on Form 8-K (File No. 000-56044) filed on August 9, 20121 and incorporated herein by reference)

10.10>‡

Letter Agreement dated as of February 18, 2022, by and between Curragh Queensland Mining Pty Ltd and Douglas Thompson.

10.11>‡

Employment Agreement dated as of July 12, 2021, by and between Coronado Global Resources Inc. and Christopher P. Meyering.

10.12>‡

Employment Agreement dated as of October 18, 2018, by and between Coronado Curragh Pty Ltd and Emma Pollard (filed as Exhibit 10.11 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference)

10.13>

Form of Stock Option Award Agreement (Long Term Incentive Grant) (filed as Exhibit 10.12 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference)

10.14>

Form of Performance Stock Unit Award Agreement (Long Term Incentive Grant) (filed as Exhibit 10.13 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference)

10.15>

Form of Non-Executive Director Restricted Stock Unit Award Agreement (filed as Exhibit 10.14 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference)

10.16>

Form of Restricted Stock Unit Award Agreement (Retention Grant) (filed as Exhibit 10.15 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference)

10.17>

Form of Restricted Stock Unit Award Agreement (STIP Deferral Grant) (filed as Exhibit 10.16 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference)

Coronado Global Resources Inc. Form 10-K December 31, 2021 176


Table of Contents

 

10.18>

Summary of Non-Executive Director Compensation (filed as Exhibit 10.17 to the Company’s Annual Report on Form 10-K (File No. 000-56044) filed on February 24, 2020 and incorporated herein by reference)

10.19>

Form of Agreement of Indemnity, Insurance and Access (filed as Exhibit 10.18 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on April 29, 2019 and incorporated herein by reference)

10.20‡

Amended Coal Supply Agreement, dated as of November 6, 2009, by and between Stanwell Corporation Limited and Wesfarmers Curragh Pty Ltd (now known as Coronado Curragh Pty Ltd) (filed as Exhibit 10.20 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on June 14, 2019 and incorporated herein by reference)

10.21‡

Deed of Amendment to the Amended Coal Supply Agreement, dated as of November 21, 2016, by and between Stanwell Corporation Limited and Wesfarmers Curragh Pty Ltd (now known as Coronado Curragh Pty Ltd) (filed as Exhibit 10.21 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on June 14, 2019 and incorporated herein by reference)

10.22‡

Curragh Mine New Coal Supply Deed, dated August 14, 2018, by and between Stanwell Corporation Limited and Coronado Curragh Pty Ltd (filed as Exhibit 10.22 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on June 14, 2019 and incorporated herein by reference)

10.23

Deed of Amendment, dated September 20, 2018 and effective September 21, 2018, among Coronado Curragh Pty Ltd, Stanwell Corporation Limited and Coronado Group LLC (filed as Exhibit 10.23 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on June 14, 2019 and incorporated herein by reference)

10.24

Deed of Amendment, dated March 5, 2019 and effective May 21, 2019, between Coronado Curragh Pty Ltd and Stanwell Corporation Limited (filed as Exhibit 10.24 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on June 14, 2019 and incorporated herein by reference)

10.25

Deed of Amendment, dated May 9, 2019 and effective May 21, 2019, between Coronado Curragh Pty Ltd and Stanwell Corporation Limited (filed as Exhibit 10.25 to the Company’s Registration Statement on Form 10 (File No. 000-56044) filed on June 14, 2019 and incorporated herein by reference)

10.26†‡

New Coal Supply Agreement, dated as of July 12, 2019, by and between Stanwell Corporation Limited and Coronado Curragh Pty Ltd. (filed as Exhibit 10.2 to the Company’s Quarterly Report on Form 10-Q (File No. 000-56044) filed on November 7, 2019 and incorporated herein by reference.

21.1

List of Subsidiaries

23.1

Consent of Ernst & Young

23.2

Consent of KPMG LLP

23.3

Consent of Barry Lay

23.4

Consent of Paul Wood

23.5

Consent of Justin S. Douthat

23.6

Consent of Michael G. McClure

23.7

Consent of John W. Eckman

23.8

Consent of Scott Peterson

31.1

Certification of the Chief Executive Officer pursuant to SEC Rules 13a-14(a) or 15d-14(a) adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002

31.2

Certification of the Chief Financial Officer pursuant to SEC Rules 13a-14(a) or 15d-14(a) adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002

32.1

Certification pursuant to 18 U.S.C. Section 1350, adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002

95.1

Mine Safety Disclosures

96.1

Technical Report Summary for Curragh

Coronado Global Resources Inc. Form 10-K December 31, 2021 177


Table of Contents

 

96.2

Technical Report Summary for Buchanan

96.3

Technical Report Summary for Logan

96.4

Technical Report Summary for Mon Valley

101

The following materials from the Company’s Annual Report on Form 10-K for the period ended December 31, 2020, formatted in iXBRL (Inline Extensible Business Reporting Language): (i) Consolidated Balance Sheets, (ii) Consolidated Statements of Operations and Consolidated Statements of Comprehensive Income, (iii) Consolidated Statements of Stockholders’ Equity/Members’ Capital, (iv) Consolidated Statements of Cash Flows, (v) related notes to these financial statements and (vi) document and entity information

104

Cover Page Interactive Data File (the cover page XBRL tags are embedded within the Inline XBRL document)

___________________________

*Portions of this exhibit have been omitted pursuant to Item 601(b)(2)(ii) of Regulation S-K, which portions will be furnished to the Securities and Exchange Commission upon request.

†Certain schedules and exhibits to this agreement have been omitted pursuant to Item 601(a)(5) and Item 601(a)(6) of Regulation S-K. A copy of any omitted schedule and/or exhibit will be furnished to the Securities and Exchange Commission upon request.

‡Portions of this exhibit have been omitted pursuant to Item 601(b)(10)(iv) of Regulation S-K, which portions will be furnished to the Securities and Exchange Commission upon request.

>Management contract, compensatory plan or arrangement

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 178


Table of Contents

 

ITEM 16. FORM 10-K SUMMARY

None.

Coronado Global Resources Inc. Form 10-K December 31, 2021 179


Table of Contents

 

SIGNATURES

 

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

 

Coronado Global Resources Inc. (Registrant)

 

 

 

By:

/s/ Garold Spindler

 

Garold Spindler

 

Managing Director and Chief Executive Officer (as duly authorized officer and as principal executive officer of the registrant)

 

Date: February 22, 2022

 

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons, on behalf of the registrant and in the capacities and on the dates indicated.

 

 

Name

Title

Date

 

 

 

/s/ Garold Spindler

Managing Director and Chief Executive Officer (Principal Executive Officer)

February 22, 2022

Garold Spindler

 

 

 

/s/ Gerhard Ziems

Group Chief Financial Officer (Principal Financial Officer and Principal Accounting Officer)

February 22, 2022

Gerhard Ziems

 

 

 

/s/ William Koeck

Director

February 22, 2022

William Koeck

 

 

 

 

/s/ Philip Christensen

Director

February 22, 2022

Philip Christensen

 

 

 

 

/s/ Greg Pritchard

Director

February 22, 2022

Greg Pritchard

 

 

 

 

/s/ Laura Tyson

Director

February 22, 2022

Laura Tyson

 

 

 

 

/s/ Sir Michael Davis

Director

February 22, 2022

Sir Michael Davis

 

Coronado Global Resources Inc. Form 10-K December 31, 2021 180

 
 
 
 
 
EXHIBIT 21.1
CORONADO GLOBAL RESOURCES INC.
 
SUBSIDIARIES
 
AS OF DECEMBER 31, 2021
Name
Coronado’s Effective Ownership
Place of Incorporation
Buchanan Minerals, LLC
 
100%
Delaware
Buchanan Mining Company LLC
 
100%
Delaware
Coronado Australia Holdings Pty Ltd
100%
Australia
Coronado Coal Corporation
100%
Delaware
Coronado Coal II LLC
100%
Delaware
Coronado Coal LLC
100%
Delaware
Coronado Curragh LLC
 
100%
Delaware
Coronado Curragh Pty Ltd
 
100%
Australia
Coronado Finance Pty Ltd
100%
Australia
Coronado II LLC
100%
Delaware
Coronado IV LLC
 
100%
Delaware
Coronado VA, LLC
100%
Delaware
Curragh Coal Sales Co Pty Ltd
100%
Australia
Curragh Queensland Mining Pty Ltd
100%
Australia
Greenbrier Minerals, LLC
 
100%
Delaware
Greenbrier Smokeless Coal Mining, LLC
100%
Delaware
JEP Mining LLC
 
100%
Delaware
Matoaka Land Company,
 
LLC
 
100%
Delaware
Midland Trail Resources, LLC
 
100%
West Virginia
Powhatan Mid-Vol Coal
 
Sales, LLC
 
100%
Delaware
Mon Valley Mineral
 
s
 
LLC
100%
Delaware
 
 
EXHIBIT 23.1
CONSENT OF INDEPENDENT REGISTERED PUBLIC
 
ACCOUNTING FIRM
We consent to the incorporation by reference
 
in the following Registration Statements:
 
1.
 
Registration Statement (Form S-3 No. 333-239730) of
 
Coronado Global Resources, Inc.;
 
2.
 
Registration Statement
 
(Form S-8
 
No. 333-236597)
 
pertaining to
 
the Coronado
 
Global Resources
 
Inc.
2018 Equity Incentive Plan and the Coronado Global Resources Inc. 2018 Non-Executive Director Plan;
and
 
3.
 
Registration Statement
 
(Form S-8
 
No. 333-249566)
 
pertaining to
 
the Coronado
 
Global Resources
 
Inc.
2018 Equity Incentive Plan.
 
of our reports dated February 22, 2022 with respect to the consolidated financial statements of Coronado Global
Resources, Inc. and the effectiveness of internal control
 
over financial reporting of Coronado Global Resources,
Inc. included
 
in this
 
Annual Report
 
(Form 10-K) of
 
Coronado Global Resources,
 
Inc. for
 
the year
 
ended December
31, 2021.
 
 
/s/ Ernst & Young
Brisbane, Australia
February 22, 2022
 
 
Exhibit 23.2
Consent of Independent Registered Public Accounting
 
Firm
We consent
 
to the
 
incorporation by
 
reference in
 
the registration
 
statements (No.
 
333-236597 and
 
333-249566)
on Forms S-8 and registration
 
statement (No. 333-239730) on
 
Form S-3 of our report
 
dated February 24, 2020,
except as
 
to note
 
3, which
 
is as
 
of February
 
25, 2021,
 
with respect
 
to the
 
consolidated financial
 
statements of
Coronado Global Resources Inc.
/s/ KPMG LLP
Richmond, Virginia
February 22, 2022
ex233p1i0.jpg
 
 
Resology Pty Ltd
5 Tristania Court,
Ormiston 4160
ACN # 622 794 834
ABN # 41622794834
 
CONSENT OF BARRY
 
LAY
I, Barry Lay,
 
BSc Geology (Hons); MAusIMM, Managing
 
Director of Resology Pty Ltd
 
prepared Sections 1.3,
1.4, 1.6, 5.2, 6, 7.1-7.3, 8, 9, 10, 11 of the Technical
 
Report Summary titled “
Coronado Global Resources
 
Inc.
(“Coronado”) Statement of Coal
 
Resources and Reserves
 
for the Curragh Mine Complex
 
in Accordance with
the JORC Code and United States
 
SEC Regulation S-K 1300 as of December
 
31, 2021 Bowen Basin Queensland,
Australia
”,
 
dated February 21, 2022
 
(the “Technical
 
Report Summary”).
With respect to the portions of the Technical
 
Report Summary that I prepared,
 
I hereby consent to the
filing with the Securities and Exchange Commission
 
of the Technical
 
Report Summary as an exhibit to
 
the
Annual Report on Form
 
10-K for the year ended December
 
31, 2021 (the “Annual
 
Report”) of Coronado
Global Resources Inc. (the “Company”)
 
and to the incorporation by reference
 
of the Technical
 
Report
Summary in the Company’s Registration
 
Statements on Form S-3 (No.
 
333-239730) and Form S-8 (Nos.
333- 236597 and 333-249566) (the “Registration
 
Statements”).
I hereby further consent to the
 
inclusion or incorporation by reference
 
in the Annual Report and the
Registration Statements of references
 
to my name (including status as an expert
 
or qualified person (as
defined in Item 1300 of Regulation S-K))
 
and the information derived
 
from the portions of the Technical
Report Summary that I prepared,
 
including any quotation therefrom
 
or summarization thereof.
Date: February 21, 2022
/s/ Barry Lay
 
Name: Barry Lay
ex234p1i0.jpg
 
 
Coronado Curragh Pty Ltd
ABN 90 009 362 565
Level 33, Central Plaza One, 345 Queen Street
GPO Box 51, Brisbane QLD 4000
T:
 
+61 7 3031 7777 |
F:
 
+61 7 3229 7402
 
Private Mail Bag, Blackwater QLD 4717
T:
 
+61 7 4986 9211 |
F:
 
+61 7 4986 9361
www.coronadoglobal.com
 
CONSENT OF PAUL
 
WOOD
I, Paul Wood, B. Eng.; MAusIMM(CP), Senior Life of
 
Mine Planner of Coronado Curragh Pty Ltd, a
 
wholly owned
subsidiary of Coronado
 
Global Resources Inc.
 
(the “Company”), prepared
 
Sections 1.1, 1.2,
 
1.5, 1.7 through
 
to
1.11,
 
2 through to
 
5, 7.4 and
 
12 through
 
to 26
 
and reviewed
 
all other
 
sections of
 
the technical
 
report summary
titled “
Coronado Global
 
Resources Inc. (
 
“Coronado”) Statement
 
of Coal
 
Resources and Reserves
 
for the
 
Curragh
Mine Complex in Accordance with the
 
JORC Code and United States SEC
 
Regulation S-K 1300 as of December
31, 2021 Bowen Basin Queensland, Australia
,” dated February 21, 2022 (the “Technical
 
Report Summary”).
With respect to the portions of the Technical
 
Report Summary that I prepared, I hereby
 
consent to the filing with
the
 
Securities
 
and
 
Exchange
 
Commission
 
of
 
the
 
Technical
 
Report
 
Summary
 
as
 
an
 
exhibit
 
to
 
the
 
Company’s
Annual
 
Report
 
on
 
Form
 
10-K
 
for
 
the
 
year
 
ended
 
December
 
31,
 
2021
 
(the
 
“Annual
 
Report”)
 
and
 
to
 
the
incorporation by reference of the Technical Report Summary in the Company’s Registration Statements on
 
Form
S-3 (No. 333-239730) and Form S-8 (Nos. 333- 236597 and
 
333-249566) (the “Registration Statements”).
I hereby further consent to the inclusion
 
or incorporation by reference in the
 
Annual Report and the Registration
Statements of references to my name (including status as an expert or qualified person (as defined in Item 1300
of
 
Regulation
 
S-K))
 
and
 
the
 
information
 
derived
 
from
 
the
 
portions
 
of
 
the
 
Technical
 
Report
 
Summary
 
that
 
I
prepared, including any quotation therefrom or summarization thereof
 
.
February 21, 2022
/s/ Paul Wood
 
Name: Paul Wood
 
ex235p1i0.jpg
 
 
582 Industrial Park Road, Bluefield, VA 24605-9364
 
■
Phone 276.322.5467
www.mma1.com
 
■
 
info@gmail.com
 
ENERGY & MINERAL RESOURCES
 
■
 
HYDROGEOLOGY & GEOLOGY
 
■
 
GEOPHYSICAL LOGGING SERVICES
CARBON MANAGEMENT
 
■
 
EXPERT WITNESS TESTIMONY
 
■
 
MINING ENGINEERING
 
■
 
PETROLEUM ENGINEERING
CONSENT OF JUSTIN S. DOUTHAT
I, Justin S. Douthat, PE, MBA, Executive Vice President of Marshall Miller & Associates,
Inc., assisted in preparing the technical report summaries identified below, each dated
February 18, 2022, relating to estimates of coal resources and reserves of Coronado Global
Resources Inc. (the “Company”) as of December 31, 2021 (the “Technical Report
Summaries”). Specifically, I prepared and assisted in preparing the following portions of the
Technical Report Summaries:
1)
Sections 1 through 5 and 11 through 25 (prepared) and Sections 6 through 10
(assisted) of the Technical Report Summary entitled
“Coronado Global Resources
Inc. (“Coronado”), Statement of Coal Resources and Reserves for the Buchanan
Mine Complex in Accordance with the JORC Code and United States SEC Standards
as of December 31, 2021 Central Appalachian Coal Basin Virginia, USA”
;
2)
Sections 1 through 5 and 11 through 25 (prepared) and Sections 6 through 10
(assisted) of the Technical Report Summary entitled
“Coronado Global Resources
Inc. (“Coronado”), Statement of Coal Resources and Reserves for the Logan County
Complex in Accordance with the JORC Code and United States SEC Standards as of
December 31, 2021 Central Appalachian Coal Basin West Virginia, USA”
; and
3)
Sections 1 through 5 and 11 through 25 (prepared) and Sections 6 through 10
(assisted) of the Technical Report Summary entitled
“Coronado Global Resources
Inc. (“Coronado”), Statement of Coal Resources and Reserves for the Mon Valley
Complex Upper Freeport Holdings in Accordance with the JORC Code and United
States SEC Standards as of December 31, 2021 Northern Appalachian Coal Basin
Pennsylvania, USA.”
With respect to the portions of the Technical Report Summaries that I prepared and assisted
in preparing, I hereby consent to the filing with the Securities and Exchange Commission of
the Technical Report Summaries as exhibits to the Company’s Annual
 
Report on Form 10-K
for the year ended December 31, 2021 (the “Annual Report”) and to the incorporation by
reference of the Technical Report Summaries in the Company’s Registration Statements on
Form S-3 (No. 333-239730) and Form S-8 (Nos. 333- 236597 and 333-249566) (the
“Registration Statements”).
I hereby further consent to the inclusion or incorporation by reference in the Annual Report
and the Registration Statements of references to my name (including status as an expert or
qualified person (as defined in Item 1300 of Regulation S-K)) and the information derived
from the portions of the Technical Report Summaries that I prepared and assisted in
preparing, including any quotation therefrom or summarization thereof.
/s/ Justin S. Douthat
 
 
Date:
 
February 18, 2022
 
 
Name: Justin S. Douthat
ex236p1i0.jpg
 
 
582 Industrial Park Road, Bluefield, VA 24605-9364
 
■
Phone 276.322.5467
www.mma1.com
 
■
 
info@gmail.com
 
ENERGY & MINERAL RESOURCES
 
■
 
HYDROGEOLOGY & GEOLOGY
 
■
 
GEOPHYSICAL LOGGING SERVICES
CARBON MANAGEMENT
 
■
 
EXPERT WITNESS TESTIMONY
 
■
 
MINING ENGINEERING
 
■
 
PETROLEUM ENGINEERING
CONSENT OF MICHAEL G. MCCLURE
I, Michael G. McClure, CPG, Principal Geologist of Marshall Miller & Associates, Inc.,
assisted in preparing the technical report summary identified below, dated February 18, 2022,
relating to estimates of coal resources and reserves of Coronado Global Resources Inc. (the
“Company”) as of December 31, 2021 (the “Technical Report Summary”). Specifically, I
prepared and assisted in preparing the following portions of the Technical Report Summary:
1)
Sections 6 through 11 (prepared) and Sections 1 through 4, 12, and 20 through 25
(assisted) of the Technical Report Summary entitled
“Coronado Global Resources
Inc. (“Coronado”), Statement of Coal Resources and Reserves for the Buchanan
Mine Complex in Accordance with the JORC Code and United States SEC Standards
as of December 31, 2021 Central Appalachian Coal Basin Virginia, USA.”
With respect to the portions of the Technical Report Summary that I prepared and assisted in
preparing , I hereby consent to the filing with the Securities and Exchange Commission of the
Technical Report Summary as an exhibit to the Company’s Annual Report on Form 10-K for
the year ended December 31, 2021 (the “Annual Report”) and to the incorporation by
reference of the Technical Report Summary in the Company’s Registration Statements on
Form S-3 (No. 333-239730) and Form S-8 (Nos. 333- 236597 and 333-249566) (the
“Registration Statements”).
I hereby further consent to the inclusion or incorporation by reference in the Annual Report
and the Registration Statements of references to my name (including status as an expert or
qualified person (as defined in Item 1300 of Regulation S-K)) and the information derived
from the portions of the Technical Report Summary that I prepared and assisted in preparing,
including any quotation therefrom or summarization thereof.
/s/ Michael G. McClure
 
 
Date:
 
February 18, 2022
 
 
Name: Michael G. McClure
ex237p1i0.jpg
 
 
582 Industrial Park Road, Bluefield, VA 24605-9364
 
■
Phone 276.322.5467
www.mma1.com
 
■
 
info@gmail.com
 
ENERGY & MINERAL RESOURCES
 
■
 
HYDROGEOLOGY & GEOLOGY
 
■
 
GEOPHYSICAL LOGGING SERVICES
CARBON MANAGEMENT
 
■
 
EXPERT WITNESS TESTIMONY
 
■
 
MINING ENGINEERING
 
■
 
PETROLEUM ENGINEERING
CONSENT OF JOHN W. ECKMAN
I, John W. Eckman, CPG, PG, Senior Geologist of Marshall Miller & Associates, Inc.,
assisted in preparing the technical report summary identified below, dated February 18, 2022,
relating to estimates of coal resources and reserves of Coronado Global Resources Inc. (the
“Company”) as of December 31, 2021 (the “Technical Report Summary”). Specifically, I
prepared and assisted in preparing the following portions of the Technical Report Summary:
1)
Sections 6 through 11 (prepared) and Sections 1 through 4, 12 and 20 through 25
(assisted) of the Technical Report Summary entitled
“Coronado Global Resources
Inc. (“Coronado”), Statement of Coal Resources and Reserves for the Logan County
Complex in Accordance with the JORC Code and United States SEC Standards as of
December 31, 2021 Central Appalachian Coal Basin West Virginia, USA.”
With respect to the portions of the Technical Report Summary that I prepared and assisted in
preparing, I hereby consent to the filing with the Securities and Exchange Commission of the
Technical Report Summary as an exhibit to the Company’s Annual Report on Form 10-K for
the year ended December 31, 2021 (the “Annual Report”) and to the incorporation by
reference of the Technical Report Summary in the Company’s Registration Statements on
Form S-3 (No. 333-239730) and Form S-8 (Nos. 333- 236597 and 333-249566) (the
“Registration Statements”).
I hereby further consent to the inclusion or incorporation by reference in the Annual Report
and the Registration Statements of references to my name (including status as an expert or
qualified person (as defined in Item 1300 of Regulation S-K)) and the information derived
from the portions of the Technical Report Summary that I prepared and assisted in preparing,
including any quotation therefrom or summarization thereof.
/s/ John W. Eckman
 
 
Date:
 
February 18, 2022
 
 
Name: John W. Eckman
ex238p1i0.jpg
 
 
582 Industrial Park Road, Bluefield, VA 24605-9364
 
■
Phone 276.322.5467
www.mma1.com
 
■
 
info@gmail.com
 
ENERGY & MINERAL RESOURCES
 
■
 
HYDROGEOLOGY & GEOLOGY
 
■
 
GEOPHYSICAL LOGGING SERVICES
CARBON MANAGEMENT
 
■
 
EXPERT WITNESS TESTIMONY
 
■
 
MINING ENGINEERING
 
■
 
PETROLEUM ENGINEERING
CONSENT OF SCOTT PETERSON
I, Scott Peterson, CPG, Senior Principal Geologist of Marshall Miller & Associates, Inc.,
assisted in preparing the technical report summary identified below, dated February 18, 2022,
relating to estimates of coal resources and reserves of Coronado Global Resources Inc. (the
“Company”) as of December 31, 2021 (the “Technical Report Summary”). Specifically, I
prepared and assisted in preparing the following portions of the Technical Report Summary:
1)
Sections 6 through 11 (prepared) and Sections 1 through 4, 12, and 20 through 25
(assisted) of the Technical Report Summary entitled
“Coronado Global Resources
Inc. (“Coronado”), Statement of Coal Resources and Reserves for the Mon Valley
Complex Upper Freeport Holdings in Accordance with the JORC Code and United
States SEC Standards as of December 31, 2021 Northern Appalachian Coal Basin
Pennsylvania, USA.”
With respect to the portions of the Technical Report Summary that I prepared and assisted in
preparing, I hereby consent to the filing with the Securities and Exchange Commission of the
Technical Report Summary as an exhibit to the Company’s Annual Report on Form 10-K for
the year ended December 31, 2021 (the “Annual Report”) and to the incorporation by
reference of the Technical Report Summary in the Company’s Registration Statements on
Form S-3 (No. 333-239730) and Form S-8 (Nos. 333- 236597 and 333-249566) (the
“Registration Statements”).
I hereby further consent to the inclusion or incorporation by reference in the Annual Report
and the Registration Statements of references to my name (including status as an expert or
qualified person (as defined in Item 1300 of Regulation S-K)) and the information derived
from the portions of the Technical Report Summary that I prepared and assisted in preparing,
including any quotation therefrom or summarization thereof.
/s/ Scott Peterson
 
 
Date:
 
February 18, 2022
 
 
Name: Scott Peterson
 
 
 
EXHIBIT 31.1
CERTIFICATION
I, Garold Spindler, certify that:
1. I have reviewed this Annual Report on Form 10-K
 
of Coronado Global Resources Inc.;
2. Based on my
 
knowledge, this report
 
does not contain
 
any untrue statement
 
of a material fact
 
or omit to state
a
 
material
 
fact
 
necessary
 
to
 
make
 
the
 
statements
 
made,
 
in
 
light
 
of
 
the
 
circumstances
 
under
 
which
 
such
statements were made, not misleading with respect to the period
 
covered by this report;
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly
present in
 
all material
 
respects the
 
financial condition,
 
results of
 
operations and
 
cash flows
 
of the
 
registrant as
of, and for, the periods presented
 
in this report;
4. The
 
registrant’s other certifying
 
officer and I
 
are responsible
 
for establishing and
 
maintaining disclosure
 
controls
and procedures (as
 
defined in Exchange
 
Act Rules 13a-15(e) and
 
15d-15(e)) and internal
 
control over financial
reporting (as defined in Exchange Act Rules 13a-15(f)
 
and 15d-15(f) for the registrant and have:
(a) Designed
 
such
 
disclosure
 
controls
 
and
 
procedures,
 
or
 
caused
 
such
 
disclosure
 
controls
 
and
procedures
 
to
 
be
 
designed
 
under
 
our
 
supervision,
 
to
 
ensure
 
that
 
material
 
information
 
relating
 
to
 
the
registrant, including
 
its consolidated
 
subsidiaries, is
 
made known
 
to us
 
by others
 
within those
 
entities,
particularly during the period in which this report is being
 
prepared;
(b) Designed such internal control over financial reporting,
 
or caused such internal control over financial
reporting to be designed under our
 
supervision, to provide reasonable assurance regarding the reliability
of financial reporting
 
and the preparation
 
of financial statements
 
for external purposes in
 
accordance with
generally accepted accounting principles;
(c) Evaluated the
 
effectiveness of
 
the registrant’s
 
disclosure controls
 
and procedures
 
and presented
 
in
this report our
 
conclusions about
 
the effectiveness
 
of the disclosure
 
controls and
 
procedures, as of
 
the
end of the period covered by this report based on such
 
evaluation; and
(d) Disclosed
 
in
 
this
 
report
 
any
 
change
 
in
 
the
 
registrant’s
 
internal
 
control
 
over
 
financial
 
reporting
 
that
occurred during the
 
registrant’s most recent fiscal
 
quarter (the registrant’s fourth
 
fiscal quarter in
 
the case
of an
 
Annual Report)
 
that has
 
materially affected or
 
is reasonably
 
likely to
 
materially affect, the
 
registrant’s
internal control over financial reporting; and
5. The registrant’s
 
other certifying
 
officer and I
 
have disclosed,
 
based on
 
our most
 
recent evaluation
 
of internal
control over
 
financial reporting,
 
to the
 
registrant’s
 
auditors and
 
the audit
 
committee of
 
the registrant’s
 
board of
directors (or persons performing the equivalent functions):
(a) All significant deficiencies and material weaknesses in
 
the design or operation of internal
 
control over
financial
 
reporting
 
which
 
are
 
reasonably
 
likely
 
to
 
adversely
 
affect
 
the
 
registrant’s
 
ability
 
to
 
record,
process, summarize and report financial information; and
(b) Any
 
fraud,
 
whether
 
or
 
not
 
material,
 
that
 
involves
 
management
 
or
 
other
 
employees
 
who
 
have
 
a
significant role in the registrant’s internal control over financial
 
reporting.
Date: February 22, 2022
/s/ Garold Spindler
Garold Spindler
Managing Director and Chief Executive Officer
 
 
 
EXHIBIT 31.2
CERTIFICATION
I, Gerhard Ziems, certify that:
1. I have reviewed this Annual Report on Form 10-K
 
of Coronado Global Resources Inc.;
2. Based on my
 
knowledge, this report
 
does not contain
 
any untrue statement
 
of a material fact
 
or omit to state
a
 
material
 
fact
 
necessary
 
to
 
make
 
the
 
statements
 
made,
 
in
 
light
 
of
 
the
 
circumstances
 
under
 
which
 
such
statements were made, not misleading with respect to the
 
period covered by this report;
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly
present in
 
all material
 
respects the
 
financial condition,
 
results of
 
operations and
 
cash flows
 
of the
 
registrant as
of, and for, the periods presented
 
in this report;
4. The
 
registrant’s other certifying
 
officer and I
 
are responsible
 
for establishing and
 
maintaining disclosure
 
controls
and procedures (as
 
defined in Exchange
 
Act Rules 13a-15(e) and
 
15d-15(e)) and internal
 
control over financial
reporting (as defined in Exchange Act Rules 13a-15(f)
 
and 15d-15(f) for the registrant and have:
(a) designed
 
such
 
disclosure
 
controls
 
and
 
procedures,
 
or
 
caused
 
such
 
disclosure
 
controls
 
and
procedures
 
to
 
be
 
designed
 
under
 
our
 
supervision,
 
to
 
ensure
 
that
 
material
 
information
 
relating
 
to
 
the
registrant, including
 
its consolidated
 
subsidiaries, is
 
made known
 
to us
 
by others
 
within those
 
entities,
particularly during the period in which this report is being prepared;
(b) Designed such internal control over financial reporting,
 
or caused such internal control over financial
reporting to be designed under our
 
supervision, to provide reasonable assurance regarding the reliability
of financial reporting
 
and the preparation
 
of financial statements
 
for external purposes in
 
accordance with
generally accepted accounting principles;
(c) Evaluated the
 
effectiveness of
 
the registrant’s
 
disclosure controls
 
and procedures
 
and presented
 
in
this report our
 
conclusions about
 
the effectiveness
 
of the disclosure
 
controls and
 
procedures, as of
 
the
end of the period covered by this report based on such
 
evaluation; and
(d) Disclosed
 
in
 
this
 
report
 
any
 
change
 
in
 
the
 
registrant’s
 
internal
 
control
 
over
 
financial
 
reporting
 
that
occurred during the
 
registrant’s most recent fiscal
 
quarter (the registrant’s fourth
 
fiscal quarter in
 
the case
of an
 
Annual Report)
 
that has
 
materially affected or
 
is reasonably
 
likely to
 
materially affect, the
 
registrant’s
internal control over financial reporting; and
 
5. The registrant’s
 
other certifying
 
officer and I
 
have disclosed,
 
based on
 
our most
 
recent evaluation
 
of internal
control over
 
financial reporting,
 
to the
 
registrant’s
 
auditors and
 
the audit
 
committee of
 
the registrant’s
 
board of
directors (or persons performing the equivalent functions):
(a) All significant deficiencies and material weaknesses in
 
the design or operation of internal
 
control over
financial
 
reporting
 
which
 
are
 
reasonably
 
likely
 
to
 
adversely
 
affect
 
the
 
registrant’s
 
ability
 
to
 
record,
process, summarize and report financial information; and
(b) Any
 
fraud,
 
whether
 
or
 
not
 
material,
 
that
 
involves
 
management
 
or
 
other
 
employees
 
who
 
have
 
a
significant role in the registrant’s internal control over financial
 
reporting.
Date: February 22, 2022
/s/ Gerhard Ziems
Gerhard Ziems
Group Chief Financial Officer
 
 
 
 
EXHIBIT 32.1
CERTIFICATIONS
 
PURSUANT TO
18 U.S.C. SECTION 1350,
AS ADOPTED PURSUANT TO
SECTION 906 OF THE SARBANES-OXLEY ACT OF
 
2002
In connection with the Annual Report of Coronado Global
 
Resources Inc. (the “Company”) on Form 10-K
 
for the
year ended December 31,
 
2021, as filed with the
 
Securities and Exchange Commission
 
on the date hereof
 
(the
“Report”),
 
each
 
of
 
the
 
undersigned
 
officers
 
of
 
the
 
company
 
certifies,
 
pursuant
 
to
 
18
 
U.S.C.
 
Section 1350,
 
as
adopted pursuant to Section 906 of the Sarbanes-Oxley
 
Act of 2002, that, to such officer’s knowledge:
1.
The
 
Annual
 
Report
 
fully
 
complies
 
with
 
the
 
requirements
 
of
 
Section 13(a) or
 
15(d) of
 
the
 
Securities
Exchange Act of 1934; and
2.
The information
 
contained
 
in the
 
Annual
 
Report fairly
 
presents,
 
in all
 
material respects,
 
the financial
condition and results of operations of
 
the Company as of the
 
dates and for the periods
 
expressed in the
Report.
/s/ Garold Spindler
Garold Spindler
Managing Director and Chief Executive Officer
/s/ Gerhard Ziems
Gerhard Ziems
Group Chief Financial Officer
Date: February 22, 2022
The foregoing certification is being furnished
 
solely pursuant to 18 U.S.C. Section
 
1350 and is not being filed as
part of the Report or as a separate disclosure document.
A signed
 
original of
 
this written
 
statement required
 
by Section 906
 
has been
 
provided to
 
the Company
 
and will
be retained by the Company and furnished to the Securities
 
and Exchange Commission or its staff on request.
 
 
EXHIBIT 95.1
Mine Safety Disclosures
Safety
 
is
 
the
 
cornerstone
 
of
 
our
 
values
 
and
 
is
 
the
 
number
 
one
 
priority
 
for
 
all
 
employees
 
at
 
Coronado
 
Global
Resources.
 
Our
 
mining
 
operation
 
at
 
Curragh,
 
located
 
in
 
Australia,
 
is subject
 
to
 
regulation
 
by the
 
Queensland
Department of Natural
 
Resources, Mine
 
and Energy,
 
or DNRME, under
 
the Coal
 
Mining Safety and
 
Health Act
1999 (Qld). The
 
operation of our
 
mines located
 
in the
 
United States
 
is subject to
 
regulation by the
 
Mine Safety
and Health
 
Administration,
 
or MSHA,
 
under the
 
Federal Mine
 
Safety and
 
Health Act
 
of 1977,
 
or the
 
Mine Act.
MSHA inspects these
 
mines on a
 
regular basis
 
and issues various
 
citations and
 
orders when it
 
believes a
 
violation
has
 
occurred
 
under
 
the
 
Mine
 
Act.
 
We
 
present
 
information
 
below
 
regarding
 
certain
 
mining
 
safety
 
and
 
health
citations that
 
MSHA has
 
issued with
 
respect to
 
our mining
 
operations. In evaluating
 
this information,
 
consideration
should be given
 
to factors such
 
as: (i) the
 
number of citations
 
and orders will
 
vary depending
 
on the size
 
of the
mine; (ii) the number of
 
citations issued will vary
 
from inspector to inspector
 
and mine to mine;
 
and (iii) citations
and orders can be
 
contested and appealed and,
 
in that process, are
 
often reduced in severity
 
and amount, and
are sometimes dismissed. Since MSHA
 
is a branch of the U.S. Department of Labor,
 
its jurisdiction only applies
to
 
our
 
operations
 
in
 
the
 
United
 
States.
 
As
 
such,
 
the
 
mine
 
safety
 
disclosures
 
included
 
herein
 
do
 
not
 
contain
information related to our Australian mines.
Under the Dodd-Frank Act,
 
each operator of a U.S.
 
coal or other mine
 
is required to include certain
 
mine safety
results within its periodic reports filed with the Securities and Exchange Commission, or the SEC.
 
As required by
the reporting requirements included in §1503(a) of the Dodd-Frank Act and Item 104 of Regulation
 
S-K (17 CFR
229.104), we present the following
 
items regarding certain mining safety
 
and health matters, for the
 
year ended
December 31, 2021, for each
 
of our U.S. mine locations
 
that are covered under the
 
scope of the Dodd-Frank Act.
The table that
 
follows reflects
 
citations and orders
 
issued to
 
us by MSHA
 
during the year
 
ended December
 
31,
2021.
 
The
 
table
 
only
 
includes
 
those
 
U.S.
 
mines
 
that
 
were
 
issued
 
orders
 
or
 
citations
 
during
 
this
 
period,
 
and
commensurate
 
with
 
SEC
 
regulations,
 
does
 
not
 
reflect
 
orders
 
or
 
citations
 
issued
 
to
 
independent
 
contractors
working at
 
our mines.
 
The proposed
 
assessments for
 
the year
 
ended December
 
31, 2021
 
were retrieved
 
from
the MSHA Data Retrieval System, or MSHA DRS, as
 
of January 4, 2022.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(A)
(B)
(C)
(D)
(E)
(F)
(G)
MSHA Mine
ID No.
Mine Name (1)(2)
Section
104
S&S
Citations
(3)
Section
104(b)
Orders
Section 104(d)
Citations and
Orders
Section 110(b)(2)
Violations
Section
107(a)
Orders
Total Dollar Value of
MSHA Assessments
Proposed
($ in thousands)
Total Number of
Mining Related
Fatalities
4404856
Buchanan Mine #1
37
—
—
—
—
83.1
—
4609319
Lower War Eagle
34
—
—
—
—
55.7
—
4609563
Eagle No. 1 Mine
43
—
—
—
—
92.7
—
4609217
Powellton #1 Mine
40
—
—
—
—
149.3
—
4609172
Mountaineer
 
Poca.
No. 1 Mine
—
—
—
—
—
0.8
—
4609175
Mountaineer
Pocahontas Load Out
—
—
—
—
—
0.1
—
4602140
Saunders Prep Plant
9
—
—
—
—
7.8
—
4604315
Elk Lick Tipple
—
—
—
—
—
0.3
—
4609564
Elk Lick Surface
3
—
—
—
—
1.0
—
4609084
Laurel Fork Mine
1
—
—
—
—
0.8
—
4609101
Toney
 
Fork
 
Surface
Mine
2
—
—
—
—
2.9
—
4609514
Muddy Bridge
30
—
—
—
—
24.8
—
4609292
Buck Lilly Surface
—
—
—
—
—
0.1
—
Total:
199
—
—
—
—
419.4
—
(1)
 
The definition of
 
“mine” under Section
 
3 of the
 
Mine Act includes
 
the mine, as
 
well as other
 
items used
in,
 
or
 
to
 
be
 
used
 
in,
 
or
 
resulting
 
from,
 
the
 
work
 
of
 
extracting
 
coal,
 
such
 
as
 
land,
 
structures,
 
facilities,
equipment,
 
machines,
 
tools
 
and
 
coal
 
preparation
 
facilities.
 
Also,
 
there
 
are
 
instances
 
where
 
the
 
mine
name per the MSHA system differs from the
 
mine name utilized by us.
(2)
 
Idle facilities are not included in the
 
table above unless they received a citation,
 
order or assessment by
MSHA during the current year or are subject to pending
 
legal actions.
(3)
 
During the year ended
 
December 31, 2021,
 
none of the
 
Company’s mines ha
 
ve received written
 
notice
from MSHA
 
of a
 
pattern of
 
violations or
 
the potential
 
to have
 
such a
 
pattern of
 
violations of
 
mandatory
health or
 
safety standards that
 
are of
 
such nature as
 
could have significantly
 
and substantially contributed
to the cause and effect of coal or other mine health or safety standards under section 104(e) of the Mine
Act.
References used in the table above are as follows:
A.
 
The
 
total
 
number
 
of
 
violations
 
of
 
mandatory
 
health
 
or
 
safety
 
standards
 
that
 
could
 
significantly
 
and
substantially
 
contribute
 
to
 
the
 
cause
 
and
 
effect
 
of
 
a coal
 
or other
 
mine
 
safety
 
or health
 
hazard
 
under
section 104 of the Mine Act (30 U.S.C. 814) for which the operator
 
received a citation from MSHA.
B. The total number of orders issued under section
 
104(b) of the Mine Act (30 U.S.C. 814(b)).
C. The
 
total
 
number
 
of citations
 
and
 
orders
 
for unwarrantable
 
failure
 
of
 
the
 
mine
 
operator
 
to
 
comply
 
with
mandatory health or safety standards under section 104(d)
 
of the Mine Act (30 U.S.C. 814(d)).
D. The total number of flagrant violations under section
 
110(b)(2) of the Mine
 
Act.
E.
 
The
 
total
 
number
 
of
 
imminent
 
danger
 
orders
 
issued
 
under
 
section
 
107(a) of
 
the
 
Mine
 
Act
 
(30
 
U.S.C.
817(a)).
F.
The total dollar value of proposed assessments from
 
MSHA under the Mine Act (30 U.S.C. 801 et seq.).
G. The total number of mining-related fatalities.
The table below presents legal actions pending before the Federal Mine Safety and Health Review Commission,
or FMSHRC, for each of the Company’s U.S. mines as of December 31, 2021, together with the number of legal
actions initiated and the number of legal actions resolved
 
during the year ended December 31, 2021.
 
 
 
 
 
 
 
 
 
 
 
 
 
Legal Actions Pending as of Last Day
 
of the Year (December 31, 2021) (1)
MSHA
Mine ID
No.
Mine Name
Contests of
Citations
and Orders
(Subpart B)
Contests of
Proposed
Penalties
(Subpart C)
Complaints for
Compensation
(Subpart D)
Complaints of
Discharge,
Discrimination
or Interference
(Subpart E)
Applications of
Temporary Relief
(Subpart F)
Appeals of Judges’
Decisions or
Orders
(Subpart H)
Legal Actions
Initiated
During the
Year
Legal Actions
Resolved
During the
Year
4404856
Buchanan
Mine #1
—
2
—
—
—
—
2
3
4609563
Eagle
 
No.
 
1
Mine
—
4
—
—
—
1
8
6
4609319
Lower
 
War
Eagle
—
—
—
—
—
—
7
8
4609175
Mountaineer
Pocahontas
No. 1
—
—
—
—
—
—
1
1
4609101
Muddy
Bridge
—
1
—
—
—
—
2
1
4609217
Powellton
#1 Mine
—
1
—
—
—
—
7
9
4602140
Saunders
Prep Plant
—
—
—
—
—
—
—
2
Total:
—
8
—
—
—
1
27
30
(1)
 
The legal
 
actions pending
 
shown in
 
the table
 
above have
 
been categorized
 
by type
 
of proceeding
 
with
reference to
 
the procedural
 
rules established by
 
the FMSHRC
 
under 29
 
CFR Part
 
2700. Reference
 
to
the applicable Subparts under this Rule are also listed.
ex961p1i0.jpg
 
Coronado Global Resources Inc. (“Coronado”) Statement of Coal
Resources and Reserves for the Curragh Mine Complex in Accordance
with the JORC Code and United States SEC Regulation S-K 1300
 
as of
December 31, 2021
Bowen Basin
Queensland, Australia
February 2022
 
 
 
 
Page 2 of 76
SIGNATURE PAGE
Effective Date of Report:
December 31, 2021
Qualified Person(s) Preparers:
/s/ Barry Lay
 
Name: Barry Lay
Managing Director of Resology Pty Ltd (Prepared Sections: 1.3, 1.4, 1.6,
 
5.2, 6, 7.1-7.3, 8, 9,
10, 11)
/s/ Paul Wood
Name: Paul Wood
Senior Life of Mine Planner – Coronado Curragh Pty Ltd (Prepared
 
Sections: 1.1, 1.2, 1.5,
1.7, 1.8, 1.9, 1.10, 1.11, 2, 3, 4, 5, 7.4, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25,
26)
Signature Date:
February 21, 2022
 
 
Page 6 of 76
FIGURES (IN REPORT)
13
15
21
22
23
25
27
28
33
33
34
35
47
47
48
50
52
61
63
63
64
65
TABLES (IN REPORT)
8
8
9
Table
 
1-4: Life Of Mine tonnage, Profit & Loss (P&L) before tax and Earnings
 
Before Interest Tax
Depreciation & Amortization (EBITDA)
10
16
16
25
26
31
37
38
41
43
43
44
44
 
46
49
53
56
57
65
68
69
69
70
72
 
 
 
 
 
Page 7 of 76
1
Executive Summary
1.1
 
Property Description
This
 
report
 
provides
 
a
 
statement
 
of
 
coal
 
Resources
 
and
 
coal
 
Reserves
 
for
 
the
 
Curragh
 
mine
 
in
 
central
Queensland, Australia, as defined under Subpart 1300 of Regulation S-K (Regulation S-K 1300) promulgated by
the
 
United
 
States
 
Securities
 
and
 
Exchange
 
Commission
 
(SEC)
and
 
the
 
Australasian
 
Code
 
for
 
Reporting
 
of
Exploration Results,
 
Mineral Resources and
 
Ore Reserves
 
(JORC Code 2012).
 
This report was
 
also prepared
in
 
accordance
 
with
 
the
 
Australasian
 
Code
 
for
 
Public
 
Reporting
 
of
 
Technical
 
Assessments
 
and
 
Valuations
 
of
Mineral Assets (VALMIN
 
Code 2015).
Coal Resources and coal Reserves are herein reported and rounded
 
to millions of metric tonnes (Mt).
 
The
 
Curragh
 
mine
 
is
 
located
 
approximately
 
200
 
kilometres
 
by
 
road
 
west
 
of
 
Rockhampton
 
and
 
approximately
14 km
 
north
 
of
 
the
 
town
 
of
 
Blackwater
 
(refer
 
to
)
 
within
 
the
 
Central
 
Highlands
 
Regional
 
Council,
Queensland Australia. The coordinates of CPP1 are 688,561
 
East, 7,400,933 North in the AMG66 grid system.
The Property
 
is comprised
 
of approximately
 
25,586 total
 
hectares of
 
Mining Leases
 
and Mineral
 
Development
Licences.
 
Underlying
 
these
 
Resource
 
Authorities
 
are
 
various
 
forms
 
of
 
cadastral
 
land
 
with
 
different
 
ownership
arrangements as detailed in section 3.2.
 
Coronado is able to access all the
 
land through either direct ownership
or signed agreements.
1.2
 
Ownership
Curragh
 
commenced
 
operations
 
in
 
1983
 
and
 
was
 
formerly
 
controlled
 
by
 
a
 
consortium
 
of
 
companies.
 
These
companies were bought out by
 
Arco Australia who later sold
 
the Property to Wesfarmers. Coronado acquired the
Property from Wesfarmers in 2018. Further details
 
on ownership are presented in Sections 3.2 to 3.4
1.3
 
Geology
The Curragh mine
 
extracts
 
seams in
 
the Rangal Coal
 
Measures including the
 
Cancer, Aries, Castor, Pollux, Orion
and Pisces seams. These
 
coals are suitable for
 
beneficiation to metallurgical and
 
thermal products. Some seams
are suitable to bypass direct to product.
 
Further details on the geology of the operations are provided in Section
6.
1.4
 
Exploration Status
The Property has been extensively explored,
 
largely by drilling open chip holes
 
as well as core holes, downhole
geophysics is used
 
extensively.
 
The majority of
 
the data was
 
acquired or generated
 
by previous owners
 
of the
Property.
 
These
 
sources
 
comprise
 
the
 
primary
 
data
 
used
 
in
 
the
 
evaluation
 
of
 
the
 
coal
 
Resources
 
and
 
coal
Reserves on the Property.
 
Ongoing exploration has been carried out by
 
Coronado since acquiring the Curragh mine.
 
The exploration data
acquired by Coronado has been
 
consistent with past drilling activities. . Further
 
details on past exploration efforts
are discussed in Section 7.
1.5
 
Operations and Development
Due
 
to
 
its
 
coal
 
reserve
 
and
 
seam
 
characteristics,
 
Curragh
 
operates
 
using
 
conventional
 
dragline
 
and
 
truck
excavator
 
methods
 
typical
 
throughout
 
the
 
Bowen
 
Basin.
 
The
 
model
 
was
 
therefore
 
generated
 
with
 
these
constraints in mind.
 
The mine produces coal that is suitable for the
 
metallurgical and thermal coal markets.
There are
 
two coal
 
preparation plants
 
at Curragh,
 
CPP1 and
 
CPP2. CPP1
 
has a
 
nameplate capacity
 
of 1,100
raw
 
tonnes
 
per
 
hour
 
(tph).
 
CPP2
 
has
 
a
 
nameplate
 
capacity
 
of
 
1,200
 
tph
 
but
 
is
 
capable
 
of
 
1,350
 
tph
 
when
processing
 
selected
 
feed
 
types
.
 
Processes
 
are
 
typical
 
of
 
those
 
used
 
in
 
the
 
coal
 
industry
 
and
 
are
 
in
 
use
 
at
adjacent coal processing plants. Further
 
details on coal processing and
 
infrastructure are discussed in Sections
14 and 15 respectively.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 8 of 76
1.6
 
Mineral Resource
Mineral Resources,
 
representing in-situ coal in which a portion of Reserves are derived, are presented below.
 
A
coal Resource
 
estimate, summarized
 
in
, was
 
prepared
 
as of
 
December
 
31,
 
2021,
 
for the
 
Curragh
Mine. Further details on our determination of resources
 
is presented in Section 11
 
.
Table 1-1: Coal Resources Summary as of December 31, 2021
Area
Measured
Indicated
Meas + Ind
Inferred
Total
Ash%
Sulphur%
VM%
Incl in Reserves
255
26
281
2
283
17.3
0.55
19.0
Excl of Reserves
234
103
337
43
380
21.2
0.56
18.8
>15:1
94
81
175
100
275
17.0
0.39
18.0
Total
583
210
793
144
937
18.8
0.51
18.6
 
Notes
 
(i)
 
Total Resource tonnes
 
are inclusive
 
of reserve
 
tonnes since
 
they include
 
the in-situ
 
tonnes from
 
which recoverable
 
coal Reserves
are derived.
(ii)
 
Coal Resource tonnes are reported on an insitu
 
basis at 5.3% moisture,
 
qualities are reported on an aid dried basis.
(iii)
 
>15:1 opencut strip ratio are the estimated underground
 
Resources.
(iv)
 
The numbers have been rounded and the
 
totals may not add up.
(v)
 
If the Resource was reported exclusive of Reserves
 
then the total would be 655Mt.
(vi)
 
Total Resource of 937Mt is inclusive of reserves.
1.7
 
Mineral Reserve
Reserve
 
tonnage
 
estimates
 
provided
 
herein
 
report
 
coal
 
Reserves
 
derived
 
from
 
the
 
in-situ
 
Resource
 
tons
presented in
 
proven and
 
probable run
 
of mine
 
(ROM) coal
 
Reserves
 
are highlighted
 
in
,
these were derived from the defined in-situ coal Resource
 
considering relevant processing, economic (including
technical
 
estimates
 
of
 
capital,
 
revenue,
 
and
 
cost),
 
marketing,
 
legal,
 
environmental,
 
socioeconomic,
 
and
regulatory
 
factors
 
as
 
well
 
as
 
legal,
 
environmental,
 
socioeconomic,
 
and
 
regulatory
 
factors.
 
The
 
equivalent
marketable Reserves are highlighted in
Table 1-2: ROM Coal Reserve Summary as of December 31, 2021 (Mt)
Curragh
 
Proven
Probable
Total
Coal Quality of Reserve inclusive of loss and dilution (adb)
Mt
Mt
Mt
Ash (%)
TS (%)
VM (%)
ROM
243
23
266
28.4
0.5
16.6
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 9 of 76
Table 1-3: Coal Reserve Summary (Marketable Sales Basis) as of December 31, 2021
 
(Mt)
Demonstrated Coal Reserves
(Wet Tons, Washed
 
or Direct Shipped, Mt)
Quality (ad)
Type
By Reliability Category
Proven
Probable
Total
Ash%
Sulphur%
VM%
CV Kcal/kg
Metallurgical
149
13
162
8.4
0.4
19.9
Thermal
49
5
54
17.7
0.4
16.3
6,286
Total
198
18
215
10.7
0.4
19.0
 
Notes
a)
 
Curragh's Reserves,
 
as stated, are 100 percent of the site
 
Reserves,
 
including all Reserves in the Curragh Project
.
b)
 
ROM Coal Reserves have been stated on a 7.5%
 
Moisture basis.
c)
 
Marketable Reserves are stated on a product moisture basis of
 
11%.
d)
Coal qualities are reported on an air-dried
 
basis
,
CV is reported on a gross as received basis.
e)
Typical marketable coal products produced range from low-ash, hard coking
 
coal to mid-ash semi-hard coking coal, a variety of
low-volatile Pulverised Coal Injection (PCI) products ranging
 
from low to high ash, and thermal coal
f)
Most tonnes and quality information have been
 
rounded, hence small differences may be present
 
in the totals.
 
g)
CV is only reported for thermal coal.
In summary,
 
Coronado controls
 
a total
 
of 215
 
Mt (moist
 
basis) of
 
marketable coal
 
Reserves,
 
at Curragh,
 
as of
December 31,
 
2021.
 
Of that
 
total, 91
 
percent are
 
proven, and
 
9 percent
 
are probable.
 
Further
 
details on
 
our
determination of reserves is presented in Section 12.
1.8
 
Capital Summary
Curragh’s capital schedule assumes
 
that major equipment rebuilds/replacements
 
occur over the course of each
machine’s remaining assumed operating life and includes development
 
capital for infrastructure and preparation
of
 
new
 
open
 
pit
 
design,
 
access,
 
and
 
entry.
 
Replacement
 
equipment
 
was
 
scheduled
 
based
 
on
 
Curragh’s
experience and
 
knowledge
 
of mining
 
equipment
 
and
 
industry standards
 
with respect
 
to the
 
useful life
 
of such
equipment.
 
A summary of the estimated capital for the Property
 
is provided in section 17.
1.9
 
Operating Costs
Mine
 
operating
 
costs
 
include
 
labour
 
and
 
supply
 
costs
 
required
 
for
 
drilling,
 
blasting,
 
overburden
 
removal,
 
coal
removal,
 
pit
 
services,
 
and
 
indirect
 
costs.
 
The
 
company
 
uses
 
both
 
employees
 
and
 
contractors
 
for
 
operations
management,
 
marketing,
 
and
 
support
 
and
 
corporate
 
services.
 
Operating
 
and
 
maintenance
 
supplies
 
and
expenses
 
include
 
fuel,
 
equipment
 
parts
 
and
 
repairs,
 
explosives,
 
power,
 
and
 
water
 
handling.
 
Equipment
employed includes draglines, shovels, excavators, trucks,
 
dozers and loaders.
Other
 
cost
 
factors
 
were
 
incorporated
 
for
 
coal
 
preparation
 
plant
 
processing,
 
refuse
 
handling,
 
coal
 
loading,
technology
 
systems
 
and
 
infrastructure,
 
insurances,
 
downstream
 
port,
 
rail
 
and
 
demurrage
 
costs
 
at
 
applicable
contract and historic average rates.
Mandated
 
and
 
contractual
 
sales
 
related
 
costs
 
such
 
as
 
rebates,
 
and
 
government
 
royalties
 
are
 
measured
 
per
legislated and or contracted rates.
A summary of projected operating costs is provided in
 
section 17.
1.10
 
Economic Evaluation
The financial model prepared for this TRS was developed
 
to test the economic viability of the coal reserve
 
area.
The results of
 
this financial model
 
are not intended
 
to represent a
 
bankable feasibility study, required for financing
of any
 
current or future
 
mining operations contemplated
 
for the
 
Coronado properties, but
 
are intended to
 
establish
the economic viability
 
of the estimated
 
coal Reserves.
 
Cash flows
 
are simulated
 
on an annual
 
basis based
 
on
projected production from
 
the coal Reserves
 
.
 
The discounted cash
 
flow analysis presented
 
herein is based
 
on
an effective date of January 1, 2022.
 
Cash flows derived
 
are an outcome
 
of economic reserve costed
 
at property known
 
contracted and historical
 
trend
observed costs in
 
consideration of total
 
waste removed to
 
extract wash produce
 
and ship
 
clean coal
 
to customers.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 10 of 76
Customer coal pricing is derived from market observed forward estimates based on global economic supply
 
and
demand analysis which is applied to mine plan sales volumes
 
and product mix.
Economic outcomes include capital forecasts and government and
 
contracted royalty and rebate payments.
Table 1-4: Life Of Mine tonnage, Profit & Loss (P&L) before tax and Earnings Before Interest
Tax Depreciation & Amortization (EBITDA)
 
LOM
Clean
LOM
PandL
LOM
EBITDA
 
Tonnes
Pre-Tax PandL
Per Tonne
EBITDA
Per Tonne
Curragh
252Mt
5.6 billion
22
7.8 billion
31
Clean tonnes valued in
 
Life Of Mine (LOM) estimates
 
are greater than marketable
 
reserves tonnes due to
 
mine
sequencing
 
required
 
for
 
open
 
pit
 
design
 
to
 
achieve
 
marketable
 
reserves.
 
Under
 
SEC
 
requirements
 
inferred
resources cannot be converted to reserves, only measure
 
and indicated resources.
In order to allow
 
the mine plan
 
to proceed however
 
inferred resources must
 
be mined, these
 
are then excluded
for reporting purposes from the marketable tonnes.
The
 
majority
 
of
 
inferred
 
tonnes
 
are
 
mined
 
late
 
in
 
the
 
schedule
 
and
 
due
 
to
 
the
 
discounting
 
affect
 
these
 
have
minimal impact on net present value (NPV).
As shown in
the Curragh Mine shows positive EBITDA
 
over the LOM.
 
Overall, Curragh’s operations
show positive LOM P&L and EBITDA of well over $5
 
billion.
Curragh’s cash flow summary,
 
excluding debt service, is shown in section 18.
Consolidated
 
cash
 
flow
 
from
 
operations
 
is
 
positive
 
over
 
the
 
mine
 
life
 
with
 
the
 
post-production
 
years
 
showing
negative cash flows due to end-of-mine reclamation spending.
 
Cash flow
 
after tax,
 
but before
 
debt service,
 
generated over
 
the life
 
of the
 
project was
 
discounted to
 
NPV at
 
a
10.0% discount rate, which represents Coronado’s risk adjusted Weighted Average Costs of Capital (WACC)
 
for
likely market
 
participants
 
if the
 
subject reserves
 
were offered
 
for sale.
 
The NPV
 
of the
 
project cash
 
flows is
 
a
point in
 
time estimate
 
of potential
 
economic
 
outcomes
 
with scope
 
for further
 
projects
 
not yet
 
considered.
 
The
NPV amounts
 
to approximately
 
$ 1.5
 
billion as
 
a base
 
line only
 
with outcomes
 
highly dependent
 
upon market
based pricing and
 
exchange rates. The financial
 
model prepared for
 
the TRS was developed
 
to test the
 
economic
viability of each coal resource area.
 
The NPV estimate was made for purposes
 
of confirming the economics
 
for
classification of coal reserves and not for purposes
 
of valuing Coronado or its Curragh assets.
 
Mine plans were
not optimized,
 
and actual
 
results of
 
the operations
 
may be
 
different,
 
but in
 
all cases,
 
the mine
 
production plan
assumes the properties are under competent management.
1.10.1
 
Sensitivity Analysis
NPV outcomes are highly sensitive to changes in
 
AUD:USD exchange rates and forward PLV
 
index coal prices.
Curragh base line NPV discounts cash flows
 
at 10% using a life of
 
mine exchange rate of 0.67 based on
 
January
2022 exchange
 
rate forward
 
curves
 
and forward
 
index
 
prices prepared
 
in December
 
2021 and
 
January
 
2022.
The resultant base line NPV is $1.5 billion.
Sensitivity of the NPV results to changes in the key drivers
 
is presented in section 18
1.11
 
Conclusion and Recommendations
Sufficient data have been obtained through various exploration and
 
sampling programs and mining operations to
support the geological interpretations
 
of seam structure and thickness
 
for coal horizons situated on
 
the Curragh
Property.
 
The
 
data
 
are
 
of
 
sufficient
 
quantity
 
and
 
reliability
 
to
 
reasonably
 
support
 
the
 
coal
 
Resource
 
and
 
coal
reserve estimates in this TRS.
 
 
Page 11 of 76
The geological data
 
and preliminary
 
feasibility study,
 
which consider
 
mining plans,
 
revenue, and
 
operating and
capital cost estimates are sufficient to support the classification
 
of coal Reserves provided herein.
 
 
 
 
 
Page 12 of 76
2
Introduction
2.1
 
Registrant and Terms of Reference
This report was prepared for the sole use of Coronado
 
Global Resources Inc. (“Coronado”) and its affiliated
 
and
subsidiary companies
 
and advisors.
 
The report
 
provides a
 
statement of
 
coal Resources
 
and coal
 
Reserves for
the
 
Curragh
 
mine,
 
as
 
defined
 
under
 
SEC
 
regulation
 
S-K
 
1300
 
and
 
the
 
Australasian
 
Code
 
for
 
Reporting
 
of
Exploration Results,
 
Mineral Resources and
 
Ore Reserves
 
(JORC Code 2012).
 
This report was
 
also prepared
in
 
accordance
 
with
 
the
 
Australasian
 
Code
 
for
 
Public
 
Reporting
 
of
 
Technical
 
Assessments
 
and
 
Valuations
 
of
Mineral Assets (VALMIN
 
Code 2015).
The report provides a statement of Coal Resources
 
and Coal Reserves for the Curragh mine. Exploration results
and Resource calculations were used as the basis for the
 
mine planning.
Coal
 
Resources
 
and
 
Coal
 
Reserves
 
are
 
herein
 
reported
 
in
 
metric
 
units
 
of
 
measurement
 
and
 
are
 
rounded
 
to
millions of metric tonnes (Mt). All currency is in USD.
2.2
 
Information Sources
This TRS is
 
based on information
 
provided by various
 
Curragh employees and
 
external consultants and
 
reviewed
by Barry
 
Lay (Qualified
 
Person Resource)
 
and Paul
 
Wood (Qualified
 
Person Reserve).
 
For the
 
evaluation, the
following tasks were completed:
●
 
Process the information supporting the estimation of Coal Resources and Coal Reserves into geological
models;
 
●
 
Develop life-of-mine (LOM) plans and financial models;
●
 
Held discussions with Coronado company management; and
 
●
 
Prepare and issue a Technical
 
Report Summary (“TRS”) providing
 
a statement of Coal Reserves
 
which
would include:
●
 
A description of the mine and facilities.
 
●
 
A description of the evaluation process.
●
 
An
 
estimation
 
of
 
Coal
 
Resources
 
and
 
Coal
 
Reserves
 
with
 
compliance
 
elements
 
as
 
stated
 
under
 
the
JORC Code and the Regulation S-K 1300.
2.3
 
Personal Inspections
Paul Wood is very
 
familiar with the Curragh
 
mine site,
 
having served with the company
 
for five years as
 
a Long
Term Mine Planner and having conducted
 
multiple site visits
 
from 2016 to
 
2019 in his
 
role in charge
 
of exploration
drilling. Barry Lay is an external
 
consultant who runs his own company Resology Pty Ltd
 
and is a former Curragh
employee with years of site experience.
2.4
 
Prior Reports
Curragh Resources
 
and Reserves
 
have historically
 
been reported
 
under JORC
 
code requirements
 
to the
 
ASX
and this Technical
 
Report Summary (TRS) is the first report prepared
 
under the requirements of SEC regulation
S-K 1300.
3
Property Description
3.1
 
Location
The Curragh Project
 
is located approximately
 
200 kilometres
 
by road west
 
of Rockhampton
 
and approximately
14 km
 
north
 
of
 
the
 
town
 
of
 
Blackwater
 
(refer
 
to
 
within
 
the
 
Central
 
Highlands
 
Regional
 
Council,
 
ex961p13i0.jpg
 
Page 13 of 76
Queensland Australia.
 
The coordinates of the
 
CPP1 are 688,561 East,
 
7,400,933 North in the AMG66
 
coordinate
system.
Figure 3-1: Location Map
 
 
Page 14 of 76
3.2
 
Titles, Claims or Leases
The
Mineral
 
Resources
 
Act
 
1989
 
(Qld)
 
(MRA)
 
and
 
the
Mineral
 
and
 
Energy
 
Resources
 
(Common
Provisions)
 
Act
 
2014
 
(Qld)
(MERCPA)
,
 
together,
 
provide
 
for
 
the
 
assessment,
 
development
 
and
utilization
 
of
 
mineral
 
resources
 
in
 
Queensland
 
to
 
the
 
maximum
 
extent
 
practicable,
 
consistent
 
with
sound
 
economic
 
and
 
land
 
use
 
management.
 
The
 
MRA
 
vests
 
ownership
 
of
 
minerals,
 
with
 
limited
exceptions, in the Crown (i.e., the state government). A royalty is payable to the Crown
 
for the right to
extract
 
minerals.
 
The
 
MRA
 
also
 
creates
 
different
 
tenures
 
for
 
different
 
mining
 
activities,
 
such
 
as
prospecting, exploring and mining.
 
A mining lease
 
(or ML) is
 
the most important
 
tenure, as it
 
permits
the
 
extraction
 
of
 
minerals
 
in
 
conjunction
 
with
 
other
 
required
 
authorities. The
 
MRA
 
imposes
 
general
conditions on an ML.
We control the coal
 
mining rights at Curragh under 14
 
coal and infrastructure mining leases, or
 
ML’s,
and three mineral development
 
licences, or MDL’s, granted pursuant
 
to the MRA. We
 
refer to the ML’s
and MDL’s at Curragh, collectively,
 
as the Tenements. Renewal of certain Tenements
 
will be required
during the mine life of Curragh and the
 
Queensland government can vary the terms and
 
conditions on
renewal. There are a number of petroleum
 
tenements which overlap with the Tenements. The priority,
consent
 
and
 
coordination
 
requirements
 
under
 
the
 
MRA,
 
MERCPA
 
and
 
the
 
Petroleum
 
and
 
Gas
(Production
 
and
 
Safety)
 
Act
 
2004
 
(Qld)
 
(as
 
relevant)
 
may
 
apply
 
with
 
respect
 
to
 
those
 
overlaps.
Extensive
 
statutory
 
protocols
 
govern
 
the
 
relationships
 
between
 
co
‑
existing
 
mining
 
and
 
exploration
rights
 
and these
 
protocols are
 
largely focused
 
on encouraging
 
the
 
overlapping tenement
 
holders to
negotiate and
 
formulate arrangements
 
that
 
enable the
 
co
‑
existence of
 
their
 
respective interests.
 
To
date, we have negotiated arrangements in place
 
with all of our overlapping tenement
 
holders and full
access to all of our Tenements.
 
The respective ML’s
 
and MDL’s are shown
 
in
,
 
and
 
 
ex961p15i0.jpg
 
Page 15 of 76
Figure 3-2: Mining Leases and Mineral Development Licenses
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 16 of 76
Table 3-1: Mining Leases
Mineral Lease
Permit Name
Expires
Hectares
Comments
ML 1878
Curragh
5/31/2024
4,455
 
ML 1990
Curragh A
5/31/2023
172
 
ML 80010
Curragh Extended No.1
5/31/2023
24
Infrastructure
ML 80011
Curragh Extended No.2
5/31/2023
6
Infrastructure
ML 80012
Curragh Extended No.3
5/31/2023
43
Infrastructure
ML 80086
Curragh East
10/31/2025
3,033
 
ML 80110
Curragh North
7/31/2044
4,860
 
ML 80112
Curragh B
5/31/2023
110
Infrastructure
ML 80123
Curragh North A
7/31/2044
5
ML 80171
Curragh West
7/31/2040
954
 
ML 700006
Curragh South
6/30/2041
1,432
 
ML 700007
Curragh Central
6/30/2041
1,123
 
ML 700008
Curragh Central Extended
11/30/2040
2,643
 
ML 700009
Curragh Extended
11/30/2040
797
 
 
 
19,658
 
Table 3-2: Mineral Development Licenses
License
Permit Name
Expires
Hectares
Comments
MDL 162
Mackenzie
2/28/2023
3,213
 
MDL 328
Curragh West No. 1
8/31/2026
381
 
MDL 329
Curragh West No. 2
8/31/2026
2,334
 
 
 
5,928
 
 
 
 
Page 17 of 76
There are no outstanding disputes or litigation. Only one tenement (ML 80123) required a native title process for
its
 
grant.
 
Curragh
 
undertook
 
the
 
Right
 
to
 
Negotiate
 
process
 
with
 
the
 
then
 
Native
 
Title
 
Parties,
 
the
 
Gaangalu
Nation People, and
 
concluded an ancillary
 
agreement and a
 
section 31 Deed
 
to allow the
 
ML to be
 
validly granted
in compliance with the
 
Commonwealth Native Title
 
Act 1993.There are
 
no material issues relating
 
to native title
for the Curragh operations
.
Curragh negotiated
 
a Cultural
 
Heritage Management
 
Plan (“CHMP”)
 
for the
 
project in
 
2012. There
 
have been
subsequent changes to
 
the registration and
 
composition of the Native
 
Title claim for the relevant
 
Aboriginal Party.
A new CHMP has been prepared for the extended Curragh
 
operations, signed on December 19, 2017.
Cultural heritage is unlikely to pose any material issues
 
to the Curragh operations.
3.3
 
Mineral Rights
Property control and mining
 
rights at Curragh are
 
entirely expressed in the
 
mining leases and licenses
 
mentioned
in
 
the
 
previous
 
section
 
of
 
this
 
document.
 
Overlapping
 
petroleum
 
tenure
 
exists
 
over
 
the
 
southern
 
and
 
eastern
extents
 
of
 
the
 
Curragh
 
tenements.
 
Under
 
the
 
Mineral
 
and
 
Energy
 
Resource
 
(Common
 
Provisions)
 
Act
 
2014
legislation
 
(‘MERCPA
 
2014”)
 
this
 
requires
 
annual
 
information
 
exchanges
 
including
 
the
 
provision
 
and
maintenance of Joint Information Management Plans
 
with the overlapping petroleum tenement holder.
 
CCPL is
compliant with the legislation and there are no current restrictions
 
to coal mining.
3.4
 
Encumbrances
There are mortgages on the tenements.
3.5
 
Other Risks
Risk exists in areas
 
of high environmental
 
significance; these are
 
managed by internal
 
processes as part of
 
the
normal
 
day
 
to
 
day
 
operations
 
of
 
the
 
mine.
 
Areas
 
that
 
have
 
high
 
environmental
 
value
 
that
 
lie
 
outside
 
of
 
the
approved disturbance footprints
 
are downgraded in
 
the Reserves to
 
the next lower
 
reserve category to
 
account
for uncertainty.
There are no
 
indications that matters associated
 
with surface rights, mineral
 
rights, or other encumbrances
 
would
deny access to the resources and reserves captured in the
 
current estimates.
 
 
 
 
Page 18 of 76
4
Accessibility,
 
Climate,
 
Local
 
Resources,
 
Infrastructure
 
and
Physiography
 
4.1
 
Topography,
 
Elevation and Vegetation
Curragh coal mine
 
is characterized by
 
a general gently
 
rolling topography,
 
which is the predominant
 
feature for
the Bowen Basin. The
 
principal drainage conduits
 
are the Mackenzie
 
River and the
 
Blackwater Creek and
 
their
tributaries, which represent the upper
 
phase of the hydrologic regime.
 
The mean altitude is between
 
140 and 150
metres above sea level.
Vegetation
 
at Curragh
 
consists primarily
 
of grass
 
land, with
 
pastures and
 
low intensity
 
cattle grazing
 
being the
primary forms of non-mining land use; the
 
secondary land use is crop farming over dry lands.
 
Most of the original
vegetation
 
was
 
cleared
 
for
 
agricultural
 
exploitation
 
with
 
a
 
relatively
 
small
 
portion
 
remaining
 
along
 
the
 
two
aforementioned waterways.
4.2
 
Access and Transport
Established sealed roads connect the mine to the town
 
s
 
of Emerald to the west and the port at Gladstone to
 
the
east.
 
Curragh site owns
 
and runs a
 
rail loop, adjacent
 
to product stockpiles
 
with a conveyor
 
system that feeds
train loadout bin.. Domestic
 
coal sales are loaded
 
onto train wagons for
 
transportation to the
 
Stanwell coal fired
power station for power generation. While export coal is transported by rail on the Blackwater line approximately
290km to
 
the RG
 
Tanna
 
or Wiggins
 
Island Coal
 
Export Ter
 
minal (WICET)
 
port facilities
 
at Gladstone.
 
No coal
transportation takes place on waterways.
4.3
 
Proximity to Population Centers
 
The
 
closest
 
population
 
centre
 
with
 
respect
 
to
 
Curragh
 
is
 
the
 
town
 
of
 
Blackwater
 
approximately
 
14
 
km
 
to
 
the
south..
 
The major regional town of Emerald, located 75 km to the west, offers daily flights to the State Capital of
Brisbane and is used extensively by Coronado personnel
 
travelling to and from site.
 
4.4
 
Climate and Length of Operating Season
The prevailing climate at
 
Curragh is sub-tropical characterized by
 
warm to hot and
 
wet summers and cool
 
to mild,
dry
 
winters.
 
The
 
highest
 
temperatures
 
are
 
observed
 
in
 
January,
 
reaching
 
an
 
average
 
of
 
34°
 
C;
 
the
 
coldest
temperatures occur in
 
July at
 
an average of
 
7°C. Annual rainfall
 
averages 635 mm,
 
with January being
 
the wettest
month with typical rainfalls of +90 mm.
 
July is the driest month with typical precipitation averaging
 
19 mm.
Except
 
for
 
a
 
few
 
occasions
 
of
 
heavy
 
summer
 
rain,
 
which
 
can
 
also
 
disrupt
 
the
 
activities
 
related
 
to
 
coal
transportation by the
 
railway to
 
the port at
 
Gladstone, there are
 
seldom major interruptions
 
at Curragh’s
 
mining
operations due to inclement weather.
 
Coal mining is therefore performed on a continuous year-round
 
basis.
 
 
 
 
 
Page 19 of 76
5
History
 
5.1
 
Previous Operation
The coal
 
mine at
 
Curragh was developed
 
in 1983
 
as a
 
joint venture between
 
the following
 
partners with respective
participation in ownership:
Arco Australia Ltd
 
30%
 
Australian Consolidated Industries Ltd
30%
 
R. W. Miller and Co.
30%
 
Mitsui and Co. (Australia)
10%
 
Arco Australia Ltd. bought
 
out the other joint
 
venturers and in 2000
 
sold the property to
 
Wesfarmers Ltd.
 
In 2014,
Wesfarmers
 
acquired
 
MDL
 
162
 
from
 
Peabody
 
Budjero
 
Pty
 
Ltd.
 
Coronado
 
acquired
 
all
 
the
 
Tenements
 
from
Wesfarmers Ltd. in
 
March 2018.
 
Since the
 
project’s inception, additional
 
mining leases and
 
development licenses
were incorporated into Curragh at different times.
 
5.2
 
Previous Exploration
Curragh has been
 
the subject
 
of numerous
 
phases of
 
exploratory drilling
 
programs extending
 
back to the
 
early
1960s. Currently
 
there are
 
some 15,000
 
boreholes available
 
for geological
 
evaluation of
 
the asset
 
with around
9,000 directly within the
 
current mineral concession borders.
 
The vast majority of
 
these boreholes are of
 
the non-
coring
 
type
 
(open
 
hole).
 
Further
 
details
 
on
 
past
 
exploration
 
efforts
 
are
 
presented
 
in
 
Section
 
7.Various
 
drilling
programmes were
 
conducted by
 
the Queensland
 
Department of
 
Minerals and Energy
 
(previously known
 
as Mines
Department) during
 
the period
 
1966-76 over
 
a large
 
area between
 
the Capricorn
 
Highway and
 
the MacKenzie
River. The
 
area was within the
 
Department of Mines Reserved
 
Area 56D (RA56D). From
 
1976 to 1978 detailed
drilling and
 
coal analysis
 
was
 
carried out
 
by officers
 
of the
 
Geological
 
Survey of
 
Queensland on
 
behalf of
 
the
State Electricity Commission of Queensland (SECQ). During this time the SECQ (SECQ’s interest is now vested
in
 
Stanwell
 
Corporation
 
Limited)
 
was
 
granted
 
Authority
 
to
 
Prospect
 
(ATP)
 
217C.
 
Extensive
 
exploration
 
of
 
the
Curragh area within ATP
 
217C occurred between 1976 and 1978.
In 1982
 
further exploration was
 
carried out
 
by Geological
 
Survey of
 
Queensland on behalf
 
of SECQ
 
in the
 
Curragh
East area. The Curragh lease (ML1878) was granted on 27 May 1982 and that part of the area was relinquished
from ATP
 
217. A significant
 
exploration programme
 
was undertaken
 
in 1993 to
 
provide coal
 
quality information
and additional structural data for Curragh East. Four hundred holes were drilled,
 
comprising 320 open holes with
geophysical logs and 80 partially cored holes.
 
 
In 1996 a large exploration
 
programme was undertaken
 
at the northern end
 
of MDL162 and this
 
work provided
the basis for the Pisces Project feasibility study
 
(Curragh North). In 2001 twenty partially cored holes were drilled
in this
 
northern
 
part of
 
MDL162 to
 
provide
 
samples
 
for
 
bench scale
 
coking
 
coal
 
testing.
 
Another
 
large
 
drilling
programme was commenced in 2003 and the culmination of all this work saw ML80110 (Curragh North) granted
on 22nd July 2004.
 
Systematic drilling
 
programs (ongoing),
 
conducted since
 
the mine
 
was commissioned, have
 
resulted in
 
thousands
of holes being drilled in the Curragh Lease area.
 
In last
 
three years,
 
several strategic
 
holes have
 
been acquired
 
on an
 
ongoing basis
 
to investigate
 
potential for
future
 
underground
 
mining.
 
Geotech,
 
gas,
 
coal
 
quality
 
and
 
spontaneous
 
combustion
 
samples
 
have
 
been
collected as part of this program.
6
Geological setting, Mineralization and Deposit
 
6.1
 
Regional, Local and Property Geology
Curragh
 
is
 
situated
 
within
 
the
 
Permo-Triassic
 
aged
 
Bowen
 
Basin
 
in
 
Eastern
 
Australia,
 
which
 
covers
approximately 16 million hectares. Its
 
physiographic make-up consists of
 
lowlands, flood plains as
 
well as rugged
 
 
Page 20 of 76
plateaus and
 
ridges. The
 
main lithological
 
units derive
 
from continental
 
and marine
 
sedimentation
 
with limited
volcanic and intrusive rocks. The principal Resources are primarily large
 
coal fields and secondarily natural gas.
The geological setting
 
of the property
 
itself consists
 
of sediments
 
of the Rangal
 
Coal Measures
 
and Burngrove
Formation, both
 
of Permian
 
age which
 
outcrop on
 
the property.
 
These units
 
underlie alluvial
 
Quaternary cover
and minor areas of
 
Tertiary sediments. Alluvial sediments typically have an average thickness
 
of 10 to
 
15 metres,
with locations of up to 30 metres of sand, clay and gravel
 
in northern areas.
The Yarrabee
 
Tuff
 
marker coincides
 
with the
 
present lower
 
limit of
 
Resource estimate.
 
shows the
typical stratigraphic column that
 
applies to the property.
 
Five main coal seams
 
groups, primarily of
 
metallurgical
quality with some thermal quality coals, are mined at Curragh,
 
as listed below:
●
 
Cancer seam
●
 
Aries seam
●
 
Castor seam
●
 
Pollux seam
●
 
Mackenzie and Pisces
The Burngrove Formation typically has thick interbedded coal and tuff beds. This coal is typically high ash and
 
is
not included in either the Resources or Reserves.
The structural
 
environment at
 
Curragh can
 
be fairly
 
complex with
 
the observed
 
seam deformation
 
the result
 
of
thrust faulting from the northeast with fault throws up to 30 m. Structural thickening can occur where thrust faults
cause affected seams to be
 
repeated, but in most cases the duplicated
 
seams are not included in the Resource
estimation, although such repeats of coal are often mined and included in
 
the Resource estimation if sequencing
permits such as the Pollux seam. Thrust faulting
 
can also result in barren areas, where seams have
 
been faulted
out. North-south and
 
east-west trending
 
normal faults
 
also occur but
 
are less common
 
than thrust faulting
.
The
structural geology within the Resource
 
adds some complexity to the project,
 
as such the mine employs a
 
strong
geotechnical program to manage geotechnical risks.
The major
 
structure that
 
limits mining
 
at Curragh
 
North is
 
the Jellinbah
 
fault, this
 
trends in
 
a north
 
west,
 
south
east direction with throws of over 100m, various splays of lesser
 
throws (10 to 20m) trend to the north west.
 
ex961p21i0.jpg
 
 
 
 
 
Page 21 of 76
Figure 6-1: Blackwater Group Stratigraphic Sequence
6.2
 
Mineralization
The
 
generalized
 
stratigraphic
 
columnar
 
section
 
in
 
demonstrates
 
the
 
vertical
 
relationship
 
of
 
the
principal coal seams and rock formations
 
at Curragh. The property,
 
as in the Bowen Basin as a whole, does
 
not
contain
 
any
 
signs
 
of
 
metamorphic
 
activity;
 
the
 
prevailing
 
lithology
 
is
 
sedimentary
 
rocks
 
with
 
a
 
few
 
igneous
intrusions. The depth of host rock weathering at Curragh is
 
on average in the order of 10 to 15 metres.
6.3
 
Coal Quality
Coal
 
seams
 
at
 
Curragh
 
are
 
mainly
 
of
 
the
 
low
 
volatile
 
metallurgical
 
grade
 
with
 
a
 
secondary
 
middling
 
thermal
product. Sulphur
 
and phosphorus
 
content is
 
generally low.
 
Insitu ash
 
is in
 
the range
 
of 20%
 
thus necessitating
beneficiation
 
to
 
meet
 
market
 
requirements,
 
which
 
in
 
this
 
case
 
is
 
accomplished
 
through
 
a
 
coal
 
handling
 
and
preparation plant. Metallurgical coal products range
 
from 7-10% product ash.
 
ex961p22i0.jpg
 
Page 22 of 76
6.4
 
Deposits
 
shows
 
a
 
3D
 
view
 
of
 
the
 
geometry
 
of
 
the
 
coal
 
horizons
 
at
 
Curragh.
 
In
 
portions
 
of
 
the
 
property,
 
a
number of these seams merge to form a single package, without any interburden strata. In the central and some
of the northern part of the property the Aries and Castor seams coalesce into one coal stratum that is referred to
locally as
 
the “Mammoth”
 
seam. The
 
Mammoth Seam
 
is analogous
 
to the
 
Leichardt
 
seam commonly
 
found in
mining
 
operations
 
further
 
north.
 
At Curragh
 
North
 
the
 
Pollux, Orion
 
and
 
Pisces
 
seams
 
coalesce
 
into one
 
unit
which is correctly referred to as
 
the Mackenzie seam, but in some contexts
 
has been referred to as the “Pisces”
seam even though the true Pisces
 
seam is only one of
 
the constituent seams of the Mackenzie assemblage.
 
The
Mackenzie seam is analogous to the Vermont seam which is commonly found in mining operations further north.
Figure 6-2: Trends in Seam Splitting and Coalescing from North to South
 
highlights
 
a
 
North-South
 
section
 
from
 
the
 
current
 
geological
 
model
 
through
 
Curragh
 
properties.
Seams of
 
economic
 
interest occur
 
at depths
 
ranging from
 
15m from
 
surface down
 
to as
 
deep as
 
400m in
 
the
deepest part of the property.
 
Interburden
 
host
 
rock
 
typically
 
consists
 
of
 
regular
 
intercalations
 
of
 
siltstones
 
and
 
mudstones,
 
with
 
layers
 
of
variable thicknesses. The rock and coal beds
 
dip gently to East direction at
 
an angle of approximately 3 degrees,
with some sections displaying dip angles as high as 10
 
degrees in association with structural deformation.
In
 
general,
 
only
 
minor
 
instances
 
of
 
intrusive
 
material
 
have
 
been
 
intercepted
 
in
 
drill
 
holes
 
or
 
mined
 
during
production at the Curragh Mine.
Igneous activity
 
is more
 
prevalent at
 
Curragh North
 
although these
 
are not
 
a major
 
impact on
 
Operations. The
intrusive includes rare dykes occurring at the northern end of Curragh North deposit.
 
There was a larger igneous
intrusion approximately 500 metres long
 
and 100 metres wide that
 
impacted the Resources of
 
the Aries, Castor
and Mackenzie seams.
 
Mining has proceeded past the area of impact of this
 
intrusion.
Curragh has been
 
subjected to
 
moderate localized
 
faulting more
 
intense in southern
 
areas that has
 
resulted in
vertical slips (displacements) as high as 20 metres, along with variations in seam thickness.
 
Seam duplication is
also common
 
as a
 
result of
 
the thrust
 
faulting but
 
in most
 
cases the
 
duplicated
 
seams are
 
not
 
included in
 
the
Resource estimation, although such repeats of coal
 
are often mined.
 
 
ex961p23i0.jpg ex961p23i1.jpg
 
Page 23 of 76
The
 
principal
 
geostructural
 
feature
 
is
 
the
 
Jellinbah
 
regional
 
thrust
 
fault
 
located
 
east
 
of
 
the
 
mine
 
outside
 
the
Resource
 
area.
 
The
 
structural
 
geology
 
within
 
the
 
Resource
 
adds
 
some
 
complexity
 
to
 
the
 
project.
 
The
 
mine
employs a strong geotechnical program to manage geotechnical
 
risks.
Figure 6-3: North South Section through Curragh
 
Tenements showing major seams
 
 
 
 
Page 24 of 76
7
Exploration
 
7.1
 
Nature and Extent of Exploration
The Curragh geological drilling database contains
 
over 18,000 holes drilled over
 
a long history of exploration and
development in the Curragh
 
area. Various
 
drilling programmes were conducted
 
by the Queensland Department
of Minerals
 
and Energy
 
(previously known
 
as Mines
 
Department) during
 
the period
 
1966-76 over
 
a large
 
area
between
 
the
 
Capricorn
 
Highway
 
and
 
the
 
MacKenzie
 
River.
 
The
 
area
 
was
 
within
 
the
 
Department
 
of
 
Mines
Reserved Area 56D
 
(RA56D). From
 
1976 to 1978
 
detailed drilling and
 
coal analysis
 
was carried out
 
by officers
of the Geological
 
Survey of
 
Queensland on
 
behalf of
 
the State
 
Electricity Commission
 
of Queensland
 
(SECQ).
During this time
 
the SECQ (SECQ’s interest
 
is now vested
 
in Stanwell Corporation
 
Limited) was granted
 
Authority
to Prospect
 
(ATP)
 
217C.
 
Extensive exploration
 
of the
 
Curragh area
 
within
 
ATP
 
217C occurred
 
between 1976
and 1978.
In 1982
 
further exploration was
 
carried out
 
by Geological
 
Survey of
 
Queensland on behalf
 
of SECQ in
 
the Curragh
East area. The Curragh lease (ML1878) was granted on 27 May 1982 and that part of the area was relinquished
from ATP
 
217. A significant
 
exploration programme
 
was undertaken
 
in 1993 to
 
provide coal
 
quality information
and additional structural data for Curragh East. Four hundred holes were drilled,
 
comprising 320 open holes with
geophysical logs and 80 partially cored holes.
 
In 1996 a
 
large exploration programme
 
was undertaken
 
at the northern
 
end of MDL162
 
and this work
 
provided
the basis for the Pisces Project feasibility study
 
(Curragh North). In 2001 twenty partially cored holes were drilled
in this
 
northern
 
part of
 
MDL162 to
 
provide
 
samples
 
for
 
bench scale
 
coking
 
coal
 
testing.
 
Another
 
large
 
drilling
programme was commenced in 2003 and the culmination of all this work saw ML80110 (Curragh North)
 
granted
on 22nd July 2004.
 
Systematic drilling
 
programs (ongoing),
 
conducted since
 
the mine
 
was commissioned, have
 
resulted in
 
thousands
of holes being drilled in the Curragh Lease area.
 
In the last three
 
years, several strategic
 
holes have been drilled
 
on an ongoing basis
 
to investigate potential
 
for
future
 
underground
 
mining.
 
Geotech,
 
gas,
 
coal
 
quality
 
and
 
spontaneous
 
combustion
 
samples
 
have
 
been
collected as part of this program.
Some
 
geophysical
 
techniques
 
including
 
seismic
 
and
 
aero-magnetics
 
have
 
supplemented
 
the
 
geological
understanding. This work is discussed in the next sections.
7.1.1
 
Non-drilling exploration
Geophysical techniques have
 
been used to
 
supplement the understanding
 
of the Curragh
 
Resource.
 
This work
has been to guide overall understanding of intrusions, seam continuity and sub-surface faults but it has not been
the main source of interpretive data for the Resource estimation,
 
which is drilling.
The mains surveys that have been conducted are:
●
 
In September
 
2003 a
 
low level
 
airborne geophysical
 
survey was
 
flown over
 
large parts
 
of the
 
Curragh
tenements to acquire magnetic and radiometric data (31.5km’s
 
of line at 100m spacing).
●
 
In
 
2019,
 
44km
 
of
 
regional
 
Scale
 
2D
 
seismic
 
acquired
 
to
 
provide
 
characterisation
 
of
 
seam
 
continuity,
seam splits and sub-surface structure.
●
 
In 2020, 18km of closely spaced
 
2D lines in ML 80110 were acquired to characterise structure and
 
seam
continuity adjacent to Pit S and Pit U,
Aero-magnetic data has
 
indicated that Resources
 
are largely intrusion
 
free except for
 
one large “plug”
 
body which
was picked up in aero-magnetics and has since been
 
mined out.
The 2D survey has been very successful to understand larger scale structures that are difficult
 
and expensive to
define with drilling.
 
The seismic
 
data indicated that
 
Resources are
 
largely continuous
 
with some disruption
 
due
to faulting. The
 
Phase I seismic
 
survey was successful
 
in locating the
 
Jellinbah fault, a
 
major regional fault
 
and
to define seam splitting in areas of sparse drilling.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex961p25i0.jpg
 
Page 25 of 76
Figure 7-1: Geophysical Surveys
7.1.2
 
Drilling Exploration
The Curragh deposit has a long history of exploration
 
with over 18,000 holes drilled in its properties (
). Of these approximately 15,000 holes are deemed
 
suitable for use in the geological model. The remainder
have been excluded due to not meeting strict data quality requirements.
 
shows the Curragh
Property drilling statistics.
 
The excluded holes comprise three broad groups of holes:
●
 
Holes that were not geophysically logged
●
 
Drill and blast holes that were only partially logged
●
 
Top
 
of coal grade control drilling
Approximately 7,500 of the included holes lie in areas
 
of declared coal Resources. Most of these boreholes are
non-coring (open holes), with a portion as cored holes for
 
coal quality and washability,
 
geotechnical, gas or
fugitive emissions purposes. Predominantly all holes are
 
logged by downhole wireline geophysical techniques.
 
Table 7-1: Drill hole Statistics
Hole Type
Metres
Number of Holes
Chip
 
1,212,896
 
 
14,084
 
Core
 
125,514
 
 
1,292
 
Total
 
1,338,410
 
15,376
Excluded Holes
 
140,430
3,389
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 26 of 76
All drilling and sampling are conducted in accordance with the Curragh Geology Planning system which sets out
standards
 
for
 
logging,
 
data
 
capture,
 
sampling
 
and
 
validation
 
of
 
drilling
 
data.
 
A
 
subset
 
of
 
these
 
procedures
 
is
shown in
Table 7-2: Selected Exploration and Data management procedures
Procedure Name
CPS PLN 2.0 Geology System Plan.pdf
CPS PRO 2.3 Exploration Planning.pdf
CPS PRO 2.4 Exploration Execution.pdf
CPS WI 2.51 Drill Site Management.pdf
CPS PRO 2.5 Exploration Data Collection.pdf
CPS WI 2.21 Establishing Exploration Requirements.pdf
CPS WI 2.22 Guide to Exploration Planning.pdf
CPS WI 2.23 Core Logging and Sampling.pdf
CPS WI 2.24 Minimum Borehole Logging Requirements.pdf
CPS WI 2.26 Sampling for Coal Quality Analysis.pdf
All
 
logging
 
and
 
data
 
management
 
is
 
conducted
 
by
 
qualified
 
geologists.
 
In
 
recent
 
years
 
all
 
geological
 
data
 
is
captured in
 
specialist
 
logging software
 
and imported
 
into the
 
Company’s
 
geological database
 
(Geobank)
 
after
rigorous data validation. The database
 
is maintained by company IT
 
professionals and administered by company
geological staff.
Drilling comprises short term operational
 
drilling designed to reduce geological uncertainty
 
in short-term planning
and long-term strategic drilling to allow for assessment
 
of future mining options.
The
 
primary
 
drilling
 
techniques
 
are
 
chip
 
drilling
 
(non-core)
 
and
 
coring.
 
Chip
 
holes
 
provide
 
ground
 
up
 
(“chip”)
samples that are returned to surface by air or water which
 
provides lithology information down the hole
 
normally
logged at 1m intervals. Down hole geophysics provides
 
detailed lithology and coal thickness data in these
 
holes
for subsequent modelling.
Downhole
 
wireline
 
techniques
 
include
 
calliper
 
(borehole
 
diameter),
 
gamma,
 
density,
 
sonic
 
and
 
borehole
verticality.
 
In some
 
cases
 
optical or
 
acoustic televiewers
 
are run
 
to provide
 
more detailed
 
bedding
 
and defect
orientation data.
Core
 
allows
 
for
 
a
 
more
 
detailed
 
understanding
 
of
 
rock
 
characteristics
 
including
 
lithology
 
fabric,
 
rock
 
defects,
hardness
 
and provides
 
physical
 
intact
 
samples
 
for subsequent
 
laboratory
 
testing.
 
Cored
 
holes
 
of either
 
63
 
or
100mm
 
diameter
 
are
 
logged,
 
photographed
 
and
 
sampled
 
by
 
a
 
qualified
 
geologist
 
into
 
company
 
geological
database. Cored holes maybe partially cored or fully cored dependent
 
on the purpose of the hole and samples.
Chips samples may
 
be collected and
 
tested for coal
 
oxidation. Core samples
 
are more common
 
and maybe taken
for several reasons:
●
 
Coal Quality and Washability samples
●
 
Dilution Samples
●
 
Geotechnical Samples
●
 
Gas and Fugitive Emissions Samples
●
 
Reactive Ground and Spontaneous Combustion Samples
Please refer to Table
 
7-4 for details on standard and procedures.
 
ex961p27i0.jpg
 
Page 27 of 76
Figure 7-2: Curragh Boreholes as of 31 August 2021 used
 
in Resource Estimate
Large core
 
holes (200mm)
 
are generally
 
drilled at
 
the start
 
of project
 
evaluation to
 
provide detailed
 
sizing and
coal quality
 
and
 
coke
 
characterisation
 
data
 
and
 
form
 
a small
 
part of
 
the Curragh
 
coal quality
 
database.
 
More
frequent
 
are
 
cored
 
holes
 
of
 
either
 
63mm
 
or
 
100mm
 
diameter.
 
These
 
holes
 
are
 
logged,
 
photographed
 
and
sampled by
 
a qualified
 
geologist. The
 
sample test
 
data provides
 
information on
 
coal quality,
 
geotechnical, gas,
reactive ground and
 
spontaneous combustion
 
characteristics.
 
shows the sample
 
locations by main
sample type.
 
ex961p28i0.jpg
 
Page 28 of 76
Figure 7-3: Sample
 
Locations by main Sample Type
7.1.3
 
Drilling, Sampling and Recovery Factors
A number
 
of drilling,
 
sampling and
 
recovery factors
 
can materially
 
affect the
 
accuracy and
 
reliability of
 
results.
These factors are routinely reviewed as part of validation
 
and estimation processes.
Drillhole spacing
 
varies
 
across
 
Curragh properties
 
from
 
as low
 
as 20m
 
to as
 
high
 
as 1-2km.
 
In years
 
prior
 
to
mining, infill drilling
 
occurs with drill
 
hole spacing decreased to
 
the order of
 
50-100m for chip holes.
 
Cored sample
drilling spacing prior to mining is generally less than 400m.
Core Recovery
 
- The diameter
 
of exploration
 
cores is
 
generally between
 
50mm and
 
100 mm, with
 
a few larger
diameter (200
 
mm) holes
 
used to
 
obtain samples
 
for simulated
 
degradation, washing,
 
combustion, and
 
coking
practices.
 
A
 
minimum
 
core
 
recovery
 
of 90%
 
is used
 
as a
 
criteria
 
for
 
acceptance
 
or rejection
 
of
 
a sample
 
for
subsequent
 
analysis.
 
If
 
a
 
sample
 
fails
 
those
 
criteria,
 
the
 
sample
 
is
 
re-drilled
 
or
 
rejected
 
from
 
subsequent
modelling.
Drillhole
 
Collar
 
Survey
 
–
 
All
 
borehole
 
locations
 
and
 
elevation
 
since
 
the
 
mid-1980’s
 
have
 
been
 
surveyed
 
by
 
a
registered mine surveyor
 
registered under the
 
Surveyors Act 2003.
 
Boreholes are surveyed
 
in a local mine
 
grid
which
 
is
 
within
 
a
 
close
 
approximation
 
to
 
Australian
 
Geodetic
 
Datum
 
(ADG84).
 
For
 
the
 
few
 
holes
 
still
 
used
 
in
 
 
Page 29 of 76
Resource models and estimation drilled prior to mid-1980’s that it is unclear what
 
survey procedures were used.
Where survey is in doubt, those holes are excluded from
 
Resource estimate.
Downhole Verticality - Recent holes in last 5-10 years have been
 
surveyed by downhole verticality tools that give
the holes
 
dip and
 
dip direction
 
at frequent
 
intervals
 
down the
 
hole. Holes
 
prior to
 
this were
 
not surveyed
 
with
verticality
 
tools
 
and
 
it
 
is
 
assumed
 
that
 
these
 
holes
 
are
 
vertical.
 
For
 
Resource
 
and
 
reserve
 
estimation,
 
this
assumption is not material.
7.1.4
 
Drilling Results and Interpretation
Coronado properties have been drilled at suitable
 
density and sufficient samples have been collected to allow
 
for
construction
 
of
 
a
 
detailed
 
geological
 
model.
 
In
 
areas
 
of
 
wider
 
drillhole
 
spacing,
 
the
 
uncertainty
 
of
 
this
 
model
increases. This uncertainty is
 
captured in Resource confidence
 
polygons in the Resource
 
estimation process and
reported accordingly as
 
Measured, Indicated or
 
Inferred Resources.
 
Only Measured or
 
Indicated resources
 
are
considered for conversion into mineral reserves.
 
shows all boreholes used in
 
the 2021 Resource model and
 
Resource estimate. The holes have been
used to
 
generate a
 
geological model,
 
through which
 
a geological
 
section is
 
presented in
 
Holes in
Burngrove Formation in south-western Mineral Development Leases are not shown as the coal in the Burngrove
Formation is not included in the Resources or Reserves.
Curragh has extensive drilling.
 
The results over the
 
years have shown that
 
the seams are generally
 
shallow dip
(less than 5°), however in fault and deformation
 
zones, steep dips occur locally.
 
Seam deformation has resulted
principally
 
from thrust
 
faulting
 
from
 
the
 
north-east
 
resulting
 
in seam
 
displacements
 
up to
 
20 metres
 
vertically.
North-south and east-west normal faults are less common
 
and some of these have a strike-slip component.
Fault deformation has
 
resulted in seam
 
thinning, thickening
 
and barren areas
 
which is more
 
prevalent in south.
The
 
Jellinbah
 
fault
 
occurs
 
on
 
the
 
eastern
 
side
 
of
 
the
 
Curragh
 
North
 
mining
 
lease.
 
The
 
fault
 
is
 
a
 
thrust
 
fault
upthrown on the eastern side by approximately 300 metres.
 
This is a physical boundary to coal mining.
Coal quality
 
sample data
 
indicates
 
that metallurgical
 
coal products
 
(low-vol coking
 
and PCI)
 
can be
 
produced
from all seams. A
 
secondary thermal product
 
is also produced
 
after beneficiation. A
 
much smaller proportion
 
of
seams
 
in
 
some
 
areas
 
are
 
only
 
suitable
 
for
 
thermal
 
coal.
 
The
 
metallurgical
 
coal
 
rank
 
(impacts
 
coke
 
strength)
slowly decreases with increasing depth to the east.
Coal
 
quality
 
models
 
are
 
well
 
supported
 
by
 
historical
 
production
 
with
 
low
 
vol
 
coking,
 
PCI
 
and
 
thermal
 
coal
produced at
 
Curragh for
 
several decades.
 
Coal quality
 
is not
 
expected to
 
materially change
 
in the
 
life of
 
mine
plan.
7.2
 
Hydrology
Curragh
 
is
 
an
 
active
 
mine
 
with
 
minimal
 
hydrologic
 
concerns.
 
Such
 
concerns
 
are
 
considered
 
to
 
be
 
well
understood, at least partly due to the extensive history
 
of operations on site.
 
Detailed
 
hydrological
 
modelling
 
has
 
been
 
carried
 
out
 
in
 
order
 
to
 
obtain
 
approvals
 
from
 
the
 
environmental
authorities. Generally, the coal seams
 
are aquifers with low permeability.
 
Active monitoring programs are also in
place. Where water is
 
present in the alluvial
 
deposits, it occurs in
 
paleochannels in the deeper
 
sections and when
present is managed
 
to not interfere
 
with operations.
 
The depth
 
to groundwater
 
in these sections
 
varies from
 
3
metres to 10 metres.
Wetlands and swamps in the area are not believed to be materially reliant on groundwater and are unlikely to be
affected by drawdown.
 
Current approved Environmental Management
 
Plans ensures any
 
environmental impacts
are minimised.
Rainfall
 
is
 
relatively
 
low,
 
with
 
an
 
average
 
of
 
635
 
mm
 
of
 
annual
 
precipitation,
 
and
 
consequently
 
interruptions
seldom
 
occur
 
in
 
the
 
mining
 
operations
 
due
 
to
 
severe
 
weather.
 
Most
 
rain
 
occurs
 
in
 
summer.
 
these
 
can
 
halt
production.
 
There
 
are
 
pit
 
stability
 
issues
 
which
 
relate
 
to
 
the
 
hydrogeologic
 
regime
 
that
 
are
 
addressed
 
in
geotechnical engineering for the project.
The
 
potential
 
for
 
acid
 
mine
 
drainage
 
issues
 
is
 
considered
 
low,
 
however
 
may
 
potentially
 
occur,
 
should
 
any
currently unidentified igneous intrusions be encountered.
 
 
Page 30 of 76
Based on current modelling, hydrology impacts are
 
limited and are currently managed to industry accepted
 
best
practices.
 
Future
 
potential
 
risks
 
and
 
mitigation
 
steps
 
will
 
require
 
continued
 
diligent
 
management
 
within
 
the
existing Environmental Authority (“EA”).
7.3
 
Geotechnical Data
Exploration boreholes and
 
the associated geophysical
 
logs are the
 
main source of
 
geotechnical data utilized
 
in
the design process and mine planning
 
for Curragh.
 
Geotechnical logging is not usually
 
performed on Resource
estimation core samples. Where geotechnical data is required,
 
specific core holes are drilled.
Knowledge of
 
the many
 
aspects of
 
regional and
 
local geology
 
also plays
 
a role
 
in determining
 
geomechanical
parameters.
 
Geostructural factors ended up becoming the most important element in defining the stability of the
excavation pits
 
in general
 
and of
 
the
 
highwall slopes.
 
In particular
 
the
 
mining
 
methods
 
applied in
 
this reserve
estimate align with those currently
 
employed in the Curragh project
 
and include conventional open-cut
 
dragline,
dozer push and truck-shovel methods.
 
The mine
 
design parameters are
 
specific to
 
the mining method
 
used, with
 
detailed wall design
 
parameters applied
to strip
 
and block
 
layouts and
 
access designed
 
specifically for
 
the allocated
 
equipment to
 
ensure geotechnical
stability is considered
Major design
 
parameter assumptions
 
are in
 
line with
 
Curragh design
 
standards as
 
applied over
 
many years
 
of
operation.
 
Geological interpretation
 
is ongoing
 
with support
 
for coal
 
recovery and
 
geotechnical studies
 
being provided
 
by
regular high wall mapping, in pit drilling, pre-production
 
drilling and refinements to fault and quality models.
Curraghs Safety
 
Health Management
 
System (SHMS)
 
provides instructions
 
on how
 
geotechnical hazards
 
and
risks are identified, reported, and managed.
 
To
 
ensure
 
that
 
appropriate
 
geotechnical
 
data
 
is
 
collected,
 
decisions
 
regarding
 
site
 
selection,
 
sampling
requirements,
 
data
 
management,
 
sample
 
analysis
 
and
 
reporting,
 
are
 
captured
 
as
 
part
 
of
 
Curraghs
 
planning
system.
 
is a curated selection of plans, processes, forms, registers and work instructions that directly relate to
geotechnical risk and geotechnical
 
sampling and testing. These documents
 
direct decision makers on
 
the correct
course
 
of
 
action
 
to
 
ensure
 
integrity
 
with
 
the
 
selection,
 
handling
 
and
 
reporting
 
and
 
analysis
 
of
 
geotechnical
samples and the identification and monitoring of geotechnical hazards. To
 
ensure document control and that the
current approved
 
document is
 
being followed,
 
these files
 
can be
 
accessed by
 
all workers,
 
at any time,
 
through
the Curragh Blackrock intranet.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 31 of 76
Table 7-3: Curragh Procedures
SHMS Category
Document Type
Document Name
Curragh
 
Principal
Hazard
Management Plan
Principal Hazard Management Plan
PLN-003
 
Principal
 
Hazard
 
Management
 
Plan
 
-
Geotechnical
Geotechnical
Processes
CPS PRO 3.1 Data Collection
CPS PRO 3.2 Data Management
CPS
 
PRO
 
3.3
 
Geotechnical
 
Assessment,
Analysis and Design
CPS
 
PRO
 
3.4
 
Review,
 
Publishing
 
and
Communication
CPS
 
PRO
 
3.5
 
Monitoring,
 
TARP
 
and
Reconciliation
CPS PRO 3.6 Audit and Improvement
Forms
CPS
 
FRM
 
3.1
 
Chain
 
of
 
Custody
 
Geotechnical
Analysis
CPS
 
FRM
 
3.2
 
Geotechnical
 
Sample
 
-
 
Test
Request Template
CPS
 
FRM
 
3.3
 
Geotechnical
 
Laboratory
 
Testing
Database – Template
CPS FRM 3.5 - Periodic Inspection
Plans
CPS PLN 3.0 Geotechnical System Plan
Registers
CPS
 
REG
 
3.1
 
Geotechnical
 
Communications
Protocol
CPS REG 3.2 RACI
CPS REG 3.3 Training Needs Analysis
CPS REG 3.4 Geotechnical Data Register
CPS
 
REG
 
3.5
 
Published
 
Geotechnical
 
Data
Register
Work Instructions
CPS WI 3.1 Non-Standard Data Checklist
CPS
 
WI
 
3.3
 
Standard
 
Laboratory
 
Tests
 
and
Sample Requirements
CPS
 
WI
 
3.4
 
Guideline
 
for
 
Engaging
 
a
Geotechnical Consultant
CPS
 
WI
 
3.5
 
Guideline
 
for
 
Commissioning
 
Third
Party Reviews
CPS
 
WI
 
3.6
 
Guideline
 
for
 
Commissioning
 
Non-
standard data
CPS
 
WI
 
3.7
 
Guideline
 
for
 
Geotechnical
 
Hazard
Mapping
CPS WI 3.8 Benchmarking
CPS WI 3.9 Guideline for Dump Planning
Geology
Plans
CPS PLN 2.0 Geology System Plan
Processes
CPS PRO 2.5 Exploration Data Collection
CPS
 
PRO
 
2.6
 
Geology
 
Data
 
and
 
Database
Management
CPS PRO 2.8 Operations Geotechnical Support
Work Instructions
CPS WI 2.1 Pit Inspections
CPS WI 2.3 Highwall Mapping
CPS WI 2.4 Sirovision Defect Mapping
CPS WI 2.5 Agisoft Defect Mapping
CPS WI 2.7 Issuing Hazard Management Advice
CPS WI 2.8 Geotechnical Data Collection
CPS WI 2.9 Geotechnical Reconciliation
CPS WI 2.12 Sinkhole Management
CPS WI 2.17 Weekly Geotechnical Report
CPS WI 2.19 Geotechnical Hazard Monitoring
CPS
 
WI
 
2.21
 
Establishing
 
Exploration
Requirements
CPS WI 2.23 Core Logging and Sampling
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 32 of 76
CPS
 
WI
 
2.24
 
Minimum
 
Borehole
 
Logging
Requirements
CPS WI 2.25 Reactive Ground Sampling
CPS WI 2.26 Sampling for Coal Quality Analysis
CPS WI 2.27 Geotech Sampling
CPS WI 2.28 Borehole Correlation
CPS WI 2.29 Sample Dispatch and Tracking
CPS WI 2.43 Borehole Peer Review
Forms
CPS
 
FRM
 
2.7
 
Geology
 
Checklist
 
for
 
Hazard
Mapping
CPS FRM 2.9 Weekly Geotechnical Report
CPS
 
FRM
 
2.10
 
Geotechnical
 
Inspection
Checklist - HighWalls and Endwalls
CPS
 
FRM
 
2.18
 
Geotechnical
 
Inspection
Checklist - In-pit Lowwall Spoil Dumps
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 33 of 76
7.4
 
2021 Geotech Sampling
 
7.4.1
 
Sample Locations
During
 
2021,
 
three
 
sites
 
in
 
Curragh
 
Main
 
and
 
three
 
sites
 
in
 
Curragh
 
North
 
were
 
selected
 
for
 
geotechnical
sampling. These comprised of four HQ sized diamond core
 
boreholes and two excavated test pits.
 
 
and
 
below highlight the location of the sample sites.
 
Figure 7-4: Geotechnical Sampling – Curragh Main (2021)
Hole ID / Test
 
Pit:
18330C
OLC Counterweight
Foundations
HME Workshop
Upgrade
SITE ID:
L7_GTGC_GTGC118
Test
 
Pit 1
Test
 
Pit 5
Type:
Geotechnical
Test
 
Pit
Test
 
Pit
Mining Lease:
ML80086
ML1878
ML1878
Location:
L-Pit
OLC Counterweight
Tower
HME Main Workshop -
Tyre Bay
Date Started:
16/04/2021
29/07/2021
13/05/2021
Date Completed:
18/04/2021
29/07/2021
13/05/2021
Final Depth:
96.00
2.50
1.00
Easting:
 
693605
688215.92
688770.96
Northing:
7401347
7401531.04
7400469.95
RL:
154.00
170.12
174.55
Figure 7-5: Geotechnical Sampling – Curragh North (2021)
Hole ID:
18332C
18342C
18323C
SITE ID:
BH_116C_geotech
BH_114C_geotech
SN_GT_01
Type:
Geotechnical
Geotechnical
Geotechnical
Mining Lease:
ML80110
ML80110
ML80110
Location:
S-Pit (UG)
S-Pit (UG)
S-Pit
Date Started:
23/04/2021
23/05/2021
26/03/2021
Date Completed:
30/04/2021
30/05/2021
28/03/2021
Final Depth:
258.06
234.06
98.53
Easting:
 
693548.40
693569.30
692005.78
Northing:
7416097.84
7415348.64
7419043.4
RL:
140.07
128.89
101.00
 
ex961p34i0.jpg
 
Page 34 of 76
Figure 7-6: Curragh North Sample Sites
 
 
ex961p35i0.jpg
 
Page 35 of 76
Figure 7-7: Curragh Sample Sites
 
 
Page 36 of 76
7.4.2
 
In Field Sample Collection
All HQ diamond core geotech
 
and test pit samples in
 
2021 were collected by trained
 
and competent geologists,
following Curragh
 
processes and work instructions for the appropriate selection, storage,
 
handling and transport
of samples (see
).
 
Lithology
 
and
 
defect
 
logging
 
was
 
undertaken
 
using
 
the
 
Australian
 
coal
 
industry
 
standard
 
–
 
ACARP
 
Project
CoalLog v3.1.
In the field, geologists over sampled rock mass units to allow greater freedom of choice for selecting appropriate
samples for further testing and to allow for spoilage from
 
transport or sample failure during the testing process.
 
HQ core samples were wrapped shortly after drilling to preserve initial conditions of the specimen and left stored
in a
 
safe location
 
away from
 
direct sunlight.
 
Photographic evidence
 
of the
 
core was
 
taken prior
 
to wrapping
 
to
allow for later
 
review. The final selection
 
of samples to
 
be used
 
for testing was
 
undertaken by chartered
 
engineers
once holes had been
 
depth corrected to geophysical logging.
 
Sample test selection was
 
determined by the target
seam, depth of
 
cover, level of weathering, geological uncertainty
 
within the area, location
 
of structures within rock
mass units and as actions from hazard mapping and geotechnical
 
reporting.
 
7.4.3
 
Samples collected from Test Pits
Samples
 
collected
 
from
 
Test
 
Pits
 
were
 
bagged
 
during
 
the
 
excavation
 
process
 
to
 
ensure
 
the
 
samples
 
were
representative
 
of
 
the
 
current
 
in-situ
 
condition
 
and
 
lithology
 
of
 
the
 
interval
 
being
 
collected.
 
Soil
 
samples
 
were
tested at Trilab to
 
determine that the soil properties
 
were suitable for the proposed
 
construction activities at that
site. In field Sample Testing
The only in field / in-situ geotechnical
 
sampling conducted in 2021 was
 
axial and diametrical Point Load Testing
(PLT) testing on HQ core
 
at four boreholes.
 
This work
 
was conducted
 
by geologists
 
during and
 
shortly
 
after drilling
 
had completed
 
to preserve
 
initial
 
core
characteristics.
 
Optimal testing frequency,
 
when possible, was every 0.10m within
 
the 2m of target seam roof, and
 
every 0.25m
in the immediate 2m of floor, and 2m-8m of roof. Photographs were taken before and after testing and the failure
mode of the samples was recorded to validate results.
Testing
 
was completed using a calibrated PLT
 
Model 6510 from HMA Geotechnical.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 37 of 76
Table 7-4: 2021 PLT
Hole ID
Mine
Number
 
of
PLTs
Conducted
Tested By
File Name
File
 
Location
 
(CCPL
Network)
18330C
Main
39
RandA
 
Field
Geologists
18330C_Point
Load
 
Testing
Logging
Q:\0.05
 
Geotechnical\3.0
GEOTECHNICAL
DATA
 
\3.4
 
Geotechnical
Boreholes\Curragh\18330C
18342C
North
146
RandA
 
Field
Geologists
18342C_Point
Load
 
Testing
Logging
Q:\0.05
 
Geotechnical\3.0
GEOTECHNICAL
DATA
 
\3.4
 
Geotechnical
Boreholes\Curragh
North\18342C
18323C
North
67
RandA
 
Field
Geologists
18323C_Point
Load
 
Testing
Logging
Q:\0.05
 
Geotechnical\3.0
GEOTECHNICAL
DATA
 
\3.4
 
Geotechnical
Boreholes\Curragh
North\18323C
18332C
North
186
RandA
 
Field
Geologists
18332C_Point
Load
 
Testing
Logging
Q:\0.05
 
Geotechnical\3.0
GEOTECHNICAL
DATA
 
\3.4
 
Geotechnical
Boreholes\Curragh
North\18332C
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 38 of 76
8
Sample preparation, Analysis and security
 
8.1
 
Prior to Sending to the Lab and Lab Procedures
Handling of coal and rock samples at Curragh follows standard procedures used in the coal mining
 
industry with
regard
 
to
 
preparation,
 
analysis
 
and
 
security.
 
Likewise,
 
laboratory
 
tests
 
are
 
performed
 
according
 
to
 
standards
utilized internationally.
 
In this instance, Curragh’s standards are based upon the Australian Standards which are
stated as applicable for this analysis.
Curragh
 
has
 
used
 
an
 
independent
 
laboratory
 
ALS
 
Coal
 
(formerly
 
ACIRL)
 
since
 
1983,
 
now
 
located
 
at
 
478
Freeman Rd, Richlands QLD 4077 for all
 
exploration coal quality determinations.
 
ALS is regularly benchmarked
against ISO 17025. by reputable organisations such as
 
(National Association of Testing
 
Authorities (NATA
 
).
The coal
 
laboratory performs
 
a specific workflow
 
of testing
 
that is
 
compatible for
 
testing of coking,
 
thermal and
PCI
 
coals.
 
The
 
testing
 
comprises
 
sample
 
pre-treatment,
 
raw
 
coal
 
quality
 
analysis,
 
washability
 
and
 
product
composite
 
testing
 
which
 
is
 
suitable
 
for
 
full
 
beneficiation
 
and
 
market
 
product
 
characterization.
 
This
 
testing
 
is
conducted under Australian and
 
international standards samples including but
 
not limited to those
 
listed in
Table 8-1: Analytical Test
 
Standards Numbers
Analytical Test
Standard No
Ash
AS1038.3
Ash Fusibility
AS1038.15
Carbon
AS1038.15
Crucible Swelling Number
AS1038.12.1
Dilatometer
AS1038.12.3
Fixed Carbon
AS1038.3
Float/Sink Analysis
AS4156.1
Gieseler
AS1038.12.4.1
Hydrogen
AS1038.6.4
Moisture (residual)
AS1038.3
Moisture Holding Capacity
AS1038.17
Nitrogen
AS1038.6.4
Oxygen
AS1038.16
Phosphorus
BS1016.14
Relative Density
AS1038.21.1.1
Size Analysis
AS3881
Gross Calorific Value
AS1038.5
Total
 
Moisture
AS1038.1
Total
 
Sulfur
AS1038.6.3.3
Volatile Matter
AS1038.3
Ash Analysis
AS1038.14.3
Proximate Analysis
AS 1038
It is the opinion of
 
the Qualified Person that
 
samples are collected, dispatched,
 
prepared, analysed and verified
adequately for subsequent Resource and evaluation and estimation.
 
 
 
 
Page 39 of 76
9
Data Verification
 
9.1
 
Procedures of Qualified Person
 
The Qualified Person
 
has a long history
 
of working with
 
Coronado geological
 
data and production
 
of geological
models
 
and
 
Resource
 
estimates.
 
The
 
data
 
verification
 
process
 
follows
 
a
 
detailed
 
process
 
for
 
confirming
 
the
accuracy of data upon which subsequent Resource and
 
reserve estimation is based. This process includes:
●
 
Collar survey checks relative to topographic surfaces
●
 
Checking downhole geophysics against interpreted coal thickness
●
 
Correlation seam sequence checks within boreholes
●
 
Correlation checks from hole to hole through sectioning
 
geological database
●
 
Checking seam thickness, mid-burden and structure plots
●
 
Validating mined
 
out polygons against LIDAR surfaces
●
 
Reconciliation of variance of model iterations
●
 
Reconciliation of variance of Resource estimate iterations
 
9.2
 
Opinion of Qualified Person
 
Some of the historical drilling in deeper parts of
 
MDL162 were not able to be fully validated due to
 
lack of original
survey records and geologists
 
written logs. Greater uncertainty
 
is placed on this
 
drilling data. However,
 
seismic
data indicates presence of strong
 
reflectors that is aligned with
 
boreholes records. Where data is
 
considered less
reliable, the coal resources are classified as lower confidence
 
resources i.e. Inferred.
 
In
 
the
 
opinion
 
of
 
the
 
Qualified
 
Person
 
Mr
 
Barry
 
Lay
 
there
 
has
 
been
 
sufficient
 
data
 
obtained
 
through
 
various
exploration
 
and
 
sampling
 
programs
 
and
 
mining
 
operations
 
to
 
support
 
the
 
geological
 
interpretations
 
of
 
seam
structure
 
and
 
thickness
 
for
 
coal
 
horizons
 
situated
 
on
 
the Curragh
 
property.
 
The
 
data
 
seem
 
to
 
be
 
of
 
sufficient
quantity and reliability to reasonably support the coal
 
Resource and coal reserve estimates in this TRS.
 
 
 
 
Page 40 of 76
10
Mineral processing and metallurgical testing
 
10.1
 
Testing Procedures and Sample Representatives
Laboratory testing procedures begin with a routine to ensure that each sample
 
is representative of typical run-of-
mine feed and Coal Prep Plant (CPP)
 
feed involving a process including drop shattering, dry
 
sizing, wet tumbling
and wet screening of coal samples.
These pre-treated samples are analysed
 
using a washability testing procedure
 
which estimates the yield and
 
ash
at various
 
density cut
 
points.
 
This information
 
is subsequently
 
used in
 
plant simulator
 
(developed
 
by A
 
and
 
B
Mylec Pty Ltd) to estimate yield and product quality after
 
applying plant and equipment efficiency factors.
Test
 
samples are
 
collected
 
as sufficient
 
density to
 
adequately represent
 
the Resource
 
at the
 
level of
 
reported
Resource and
 
reserve classification.
 
The testing
 
provides sufficient
 
information to
 
determine the
 
coal type
 
(ie.
Coking, PCI or Thermal). There has historically been a good
 
correlation between laboratory test results and train
or shipping results.
10.2
 
Laboratory Details
Curragh has used
 
an independent
 
laboratory now trading
 
as ALS Coal
 
(“ALS”) since
 
1983, now located
 
at 478
Freeman Rd, Richlands QLD 4077 for all exploration coal quality determinations.
 
ALS is accredited by National
Association of Testing Authorities
 
(NATA).
 
NATA
 
assesses that ALS have appropriately trained people, systems
and controls. A NATA
 
assessed coal quality laboratory is certified against
 
ISO/IEC 17025:2017.
Testing
 
is
 
conducted
 
against
 
appropriate
 
Australian
 
and
 
international
 
standards.
 
The
 
most
 
common
 
standard
numbers are as per
10.3
 
Assumptions and Prediction
Resource recovery
 
estimates are
 
based on
 
inputs of extensive
 
coal quality
 
borehole testing
 
which provide
 
run-
of-mine feed sizing, yield and expected product quality.
Expected
 
processing
 
product
 
yields
 
are
 
estimated
 
using
 
coal
 
borecore
 
information
 
and
 
coal
 
loss
 
and
 
dilution
assumptions validated through
 
mine reconciliations. A
 
process simulator
 
developed by AandB
 
Mylec applies
 
loss,
dilution, and plant efficiency
 
factors to derive final yield
 
and quality information at
 
each borehole datapoint. This
data is then modelled in Vulcan
 
software for import to mine scheduling
 
tools. There are no deleterious elements
that have
 
not already
 
been factored
 
in reserves
 
estimates and
 
modelling that
 
would have
 
significant impact
 
on
economic extraction.
 
highlights the loss and dilution assumptions used in the life
 
of mine plan.
10.4
 
Opinion of Qualified Person
 
Sufficient metallurgical testing data have been obtained through various exploration and sampling programs and
mining operations to reasonably support the coal Resource
 
and coal reserve estimates in this TRS.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 41 of 76
11
Mineral Resource Estimates
 
11.1
 
Assumptions, Parameters and Methodology
Coal Resources were estimated as of December 31, 2021.
Resology Pty Ltd independently created a geological model at
 
end of August 2021 in MAPTEK Vulcan modelling
software to define the coal Resources at Curragh. The process follows extensive validation of drillhole data. The
model included drillholes available in the company geological
 
database at end of August 2021.
 
The geological
 
model comprises
 
a 50m
 
grid
 
cell
 
model encompassing
 
all of
 
Curragh’s
 
tenements
 
and
 
seams
within
 
the
 
Rangal
 
Coal
 
Measures
 
only.
 
Seams
 
in
 
the
 
lower
 
Burngrove
 
Formation
 
have
 
not
 
been
 
modelled
 
or
estimated.
 
The
 
geological
 
model
 
includes
 
multiple
 
model
 
types
 
including
 
seam
 
structure,
 
base
 
of
 
quaternary,
 
base
 
of
weathering, raw quality, coking and thermal quality and simulated yield
 
and product quality. This model has been
used in all Resource and reserve estimates as discussed
 
in the TRS.
 
At Resource classification
 
stage, thickness and ash
 
cut-offs were applied.
 
Resource classification
 
methodology
and assumptions are discussed under section 11.4.
 
Coal Resources were calculated for each
 
Resource confidence polygon using a seam
 
model thickness grid and
an insitu density grid. The density grid was derived from
 
a seam ash to relative density regression equation
 
with
an
 
adjustment
 
for
 
estimated
 
insitu
 
moisture
 
(5.3%).
 
MAPTEK
 
RSVUTE
 
software
 
was
 
used
 
to
 
calculate
 
the
Resource tonnes for each seam and each Resource confidence
 
category.
 
Mining surveyed
 
face positions
 
as of
 
September 30,
 
2021, were
 
used as
 
a starting
 
point of
 
the estimate,
 
with
three months of mining depletion
 
(Sep 21–
 
Dec 21) applied to give
 
coal final Resource estimate at December 31,
2021.
 
11.2
 
Qualified Person’s Resource Estimate
Based on the assumptions
 
and methodology described,
 
a coal Resource
 
estimate, summarized in
,
was prepared as of December 31, 2021, for property controll
 
ed by Coronado.
 
Table 11
 
-1: Coal Resources Summary as of December 31, 2021
Area
Measured
Indicated
Meas + Ind
Inferred
Total
Ash%
Sulphur%
VM%
Inc in Reserves
255
26
281
2
283
17.3
0.55
19.0
Exc of Reserves
234
103
337
43
380
21.2
0.56
18.8
>15:1
94
81
175
100
275
17.0
0.39
18.0
Total
583
210
793
144
937
18.8
0.51
18.6
 
Notes (i) Coal Resource tonnes are reported on
 
a 5.3% in-situ Moisture basis
 
 
(ii) Coal qualities are reported on an air-dried
 
basis
 
(iii) Coal Resources are reported inclusive of
 
reserves
 
(iv) If the Resource was reported on a reserve
 
exclusive basis the Resource would be 655Mt
 
(v) The numbers have been rounded
 
and the totals may not add up.
 
(vi) The stripping ratio is a cookie cutter bank
 
cubic metres (bcm) of burden per insitu tonne of
 
coal
(vii) Total
 
Coal Resources, 937Mt,
 
are reported inclusive of Coal Reserves
 
The
 
total
 
coal
 
Resources
 
within
 
the
 
project
 
concession
 
boundaries
 
are
 
approximately
 
937
 
million
 
tonnes,
 
as
determined
 
at
 
an
 
effective
 
year
 
end.
 
Compared
 
to
 
established
 
criteria,
 
this
 
quantity
 
of
 
Resources
 
classifies
Curragh as a large coal mining proposition.
 
 
 
Page 42 of 76
11.3
 
Cut-off thickness and insitu ash
Open cut Resources have been estimated
 
where thickness is greater than 0.3
 
metres and a raw insitu
 
ash below
50% (air-dried basis).
 
Underground Resources have been estimated
 
where the insitu coal thickness
 
is greater than 1.5m. No ash
 
cut-
off has been applied as all reported seams have
 
low insitu ash (<~20% air-dried).
 
Underground Resources are
 
those that can potentially
 
be accessed from final
 
open-cut highwall using
 
a variety
of techniques including but not limited to board and pillar
 
mining techniques and highwall augering.
 
The split between open cut
 
and underground Resources has
 
been based on a 15:1
 
vertical insitu stripping ratio
(i.e. 15 bcm of waste
 
to one tonne of insitu
 
coal) as per previous
 
public Resource estimates. This
 
line has been
chosen as a
 
possible mining limit
 
considering the long-term
 
life asset of Curragh
 
assets and to
 
limit variation in
estimates from year to year based on short-term market
 
factors.
 
Deeper potential mineralization that
 
is poorly defined
 
through exploration or not
 
easily accessible from final
 
open-
cut highwalls has been excluded from the Resource
 
estimate.
 
11.4
 
Resources Exclusive of Reserves
 
Curragh tenements contain Resources
 
exclusive of Reserves which
 
have not been included
 
in the current mine
plan (
). Reasons that may preclude elevation
 
for Resources to Reserves
 
include, but are not limited
to:
 
●
 
Insufficient
 
data
 
and/or
 
incomplete
 
technical
 
studies
 
to
 
justify
 
the
 
conversion
 
of
 
coal
 
Resources
 
to
Reserves
 
●
 
Open cut Resources that may not justify conversion
 
to Reserves with current mining costs and/or
 
short-
term product price assumptions
 
Considering
 
the
 
long-life
 
of
 
Curragh
 
assets,
 
changing
 
technologies
 
and
 
varying
 
market
 
conditions
 
over
 
time
provide there will be an option to revise Reserves periodically.
 
11.5
 
Initial Economic Assessment
 
●
 
There are
 
380Mt of
 
Resource suitable
 
for open
 
cut mining
 
outside of
 
the reserves.
 
The cost
 
of mining
these Resources has been estimated using internal
 
cashflow models over the life of
 
mine plan, the cost
is estimated at
 
110
 
USD/product tonne (Prdt).
 
Product price was
 
estimated by creating
 
polygons of the
areas covered by the 380Mt of
 
Resource and using the simulation
 
grids in Vulcan to
 
estimate a primary
and secondary yield for the Mammoth, Mackenzie and
 
Pollux seams. These yields were then applied
 
to
a semi hard coking coal
 
and export thermal product
 
price. The resultant
 
product price was estimated
 
to
be 143
 
USD/Prdt and the margin 33 USD/Prdt.
●
 
There are 275MT of Resource suitable for underground
 
mining using the definition >15:1 stripping ratio.
The stripping ratio is a high
 
level cut off used to allocate
 
different seam mining thicknesses
 
for the open
cut and underground. The approach taken to estimate the
 
mining margin of these was:
a.
 
Estimate an average
 
mining cost using
 
Wood Mackenzie underground mining
 
costs, the average
cost of ten underground mines in Queensland was estimated
 
to be 90 USD/Prdt.
 
b.
 
Product price was
 
estimated by creating
 
polygons of the
 
areas covered by
 
the 275M Resource
tonnes and
 
using the
 
simulation grids
 
in Vulcan
 
to estimate
 
a primary
 
and secondary
 
yield for
the
 
Mammoth,
 
Mackenzie
 
and
 
Pollux
 
seams.
 
These
 
yields
 
were
 
then
 
applied
 
to
 
a
 
semi
 
hard
coking coal
 
and export
 
thermal product
 
price. The
 
resultant product
 
price was
 
estimated to
 
be
147 USD/Prdt and the margin 57 USD/Prdt.
11.6
 
Resource Classification and Estimate Uncertainty
 
Resource Classifications have been based on a borehole
 
geostatistical study conducted in 2020:
 
Curragh Drillhole Spacing Analysis Project; Resology
 
Pty Ltd; October 2020
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 43 of 76
The project involved exploratory data analysis (“EDA”) of seam thickness and quality information to define seam
domains. Each seam
 
domain was then
 
assessed using drillhole
 
spacing analysis (“DHSA”) to
 
calculate the global
estimation
 
precision
 
(“error”)
 
for each
 
major
 
seam.
 
A
 
10-year
 
mining
 
rate
 
was
 
then
 
used
 
to
 
calculate
 
error
 
at
different drillhole spacings for use in Resource
 
classification process.
 
The
 
critical
 
Resource
 
variables
 
analyzed
 
were
 
seam
 
thickness
 
and
 
insitu
 
ash.
 
These
 
were
 
chosen
 
for
 
the
Resource
 
estimate
 
classification
 
as these
 
parameters
 
are the
 
main
 
drivers
 
of economics.
 
Ash exhibits
 
a very
good correlation to density and hence density was not analyzed separately.
 
Ash also exhibits a good correlation
to total product yield, a proxy for product tonnes. Other quality parameters are well with market acceptability and
not reviewed separately.
 
As all seam
 
exhibit different
 
variability for thickness
 
and ash in
 
different domains,
 
a variety of
 
drillhole spacings
have
 
been
 
applied.
 
In
 
summary,
 
the
 
following
 
drillhole
 
spacing
 
ranges
 
(
)
 
have
 
been
 
applied
 
for
thickness and
 
ash to
 
define reported
 
Resource categories.
 
The value
 
chosen will
 
depend on
 
which seam,
 
and
which domain is being estimated. The drillhole
 
spacings for a given category tend
 
to be higher at Curragh North
compared to other parts of the deposit due to lower seam
 
variability.
Table 11
 
-2: Ranges of drillhole spacing used to define coal Resource
 
categories (metres)
 
Measured
Indicated
 
Inferred
 
Thickness
 
500-1000m
 
800-2400m
 
2000-4000m
 
Ash
 
800-1000m
 
1400-1800m
 
3500m
 
 
For
 
reported
 
categories
 
the
 
following
 
precision
 
levels
 
apply
 
(
).
 
Resources
 
reported
 
as
 
Measured
would be expected to be within +/- 10% on if mined over
 
a 10-year mining timeframe.
Table 11
 
-3: Resource Estimate Global Precision
Category
Global Estimation Precision
Measured
+/- 10%
Indicated
+/- 10%-20%
Inferred
+/- 20%-50%
 
11.7
 
Qualified Person ’s Opinion
 
It
 
is
 
the
 
Qualified
 
Person’s
 
opinion
 
that
 
the
 
Resource
 
estimate
 
is
 
an
 
accurate
 
and
 
fair
 
representation
 
of
 
the
Curragh’s coal
 
Resource and
 
that all
 
issues relating
 
to relevant
 
technical and
 
economic factor
 
can be resolved
by further work and/or improvement in
 
cost base over time with
 
innovation and improving mining technology over
a long mine life.
 
Sufficient exploration data
 
is supported by a
 
longstanding history of
 
successful coal production
at Curragh, further increasing the confidence of the Resource
 
estimates.
11.8
 
Qualified Person ’s Credentials
Mr.
 
Barry
 
Lay,
 
BSc
 
Geology
 
(Hons);
 
MAusIMM;
 
possesses
 
the
 
necessary
 
credentials
 
as
 
a
 
member
 
of
 
the
AusIMM to serve as a Qualified Person
 
for this TRS.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 44 of 76
12
Mineral Reserve Estimates
Reserve
 
tonnage
 
estimates
 
provided
 
herein
 
report
 
coal
 
Reserves
 
derived
 
from
 
the
 
in-situ
 
Resource
 
tonnes
presented
 
in
,
 
and
 
not
 
in
 
addition
 
to
 
coal
 
Resources.
 
Proven
 
and
 
probable
 
coal
 
Reserves
 
were
derived
 
from
 
the
 
defined
 
coal
 
Resource
 
considering
 
relevant
 
mining,
 
processing,
 
infrastructure,
 
economic
(including
 
estimates
 
of
 
capital,
 
revenue,
 
and
 
cost),
 
marketing,
 
legal,
 
environmental,
 
socio-economic
 
and
regulatory
 
factors.
 
The
 
Mineral
 
Reserve
 
estimates
 
for
 
Curragh
 
have
 
been
 
determined
 
and
 
are
 
presented
 
in
 
and
. The numbers
 
are based on
 
the results and
 
findings of the
 
Qualified Persons
 
and
their
 
application
 
of
 
the
 
relevant
 
modifying
 
factors
 
to
 
the
 
aforementioned
 
Resource
 
model.
 
The
 
Reserves
presented
 
consider
 
only
 
the
 
Measured
 
and
 
Indicated
 
Resources
 
that
 
have
 
subsequently
 
been
 
converted
 
to
Proven and Probable Reserves.
Table 12-1: ROM Coal Reserve Summary as of December 31, 2021 (Mt)
Curragh
 
Proven
Probable
Total
Coal Quality of Reserve inclusive of loss and dilution (adb)
Mt
Mt
Mt
Ash (%)
TS (%)
VM (%)
ROM
243
23
266
28.4
0.5
16.6
Table 12-2: Coal Reserve Summary (Marketable Sales Basis) as of December 31, 2021 (Mt)
Demonstrated Coal Reserves
(Wet Tonnes, Washed
 
or Direct Shipped, Mt)
Quality (ad)
Type
By Reliability Category
Proven
Probable
Total
Ash%
Sulphur%
VM%
CV Kcal/kg
Metallurgical
149
13
162
8.4
0.4
19.9
Thermal
49
5
54
17.7
0.4
16.3
6,286
Total
198
18
215
10.7
0.4
19.0
a)
 
Curragh's
 
Reserves,
 
as stated,
 
are 100 percent
 
of the site
 
Reserves,
 
including
 
all Reserves
 
in
the Curragh
 
Project
.
b)
All tonnes are millions of metric tonnes (Mt).
c)
 
ROM Coal
 
Reserves
 
have been
 
stated on
 
a 7.5%
 
Moisture
 
basis.
d)
 
Marketable
 
Reserves
 
are stated
 
on a
 
11%
 
moisture
 
basis,
including
 
a combination
 
of surface
moisture
 
and inherent
 
moisture.
e)
 
Coal qualities
 
are reported
 
on an
 
air-dried basis
 
,
 
CV is
 
reported
 
on a gross
 
as received
 
basis.
f)
Typical marketable coal products
 
produced range from low-ash, hard coking coal to mid-ash semi-hard
coking coal, a variety of low-volatile PCI products ranging
 
from low to high ash, and thermal coal
g)
Most tonnes and quality information have been rounded, hence small differences may be present in the
totals.
 
h)
 
CV is
 
only reported
 
for thermal
 
coal.
Total Reserves within Curragh’s concession boundaries are
 
approximately 215 million tonnes
 
of marketable coal.
 
12.1
 
Assumptions, Parameters and Methodology
The
 
author
 
adopted
 
reasonable
 
assumptions
 
when
 
applying
 
the
 
appropriate
 
modifying
 
factors
 
to
 
Curragh’s
Resources
 
to
 
derive
 
reserve
 
estimates.
 
Such
 
modifying
 
factors
 
include
 
mining,
 
metallurgical,
 
economic,
marketing, legal, environmental, social and governmental factors.
 
Proven Coal Reserves
 
are the economically
 
mineable part of
 
a measured coal
 
Resource, adjusted for
 
diluting
materials
 
and
 
allowances
 
for
 
losses
 
when
 
the
 
material
 
is mined.
 
It
 
is
 
based
 
on
 
appropriate
 
assessment
 
and
studies
 
in
 
consideration
 
of
 
and
 
adjusted
 
for
 
reasonably
 
assumed
 
modifying
 
factors.
 
These
 
assessments
demonstrate that extraction could be reasonably justified at
 
the time of reporting.
 
Probable
 
Coal
 
Reserves
 
are
 
the
 
economically
 
mineable
 
part
 
of
 
an
 
indicated
 
coal
 
Resource,
 
and
 
in
 
some
circumstances a
 
measured
 
coal Resource,
 
adjusted for
 
diluting materials
 
and allowances
 
for losses
 
when the
 
 
 
Page 45 of 76
material
 
is
 
mined.
 
It
 
is
 
based
 
on
 
appropriate
 
assessment
 
and
 
studies
 
in
 
consideration
 
of
 
and
 
adjusted
 
for
reasonably assumed
 
modifying factors.
 
These assessments
 
demonstrate
 
that extraction
 
could be
 
reasonably
justified at the time of reporting.
 
Upon completion of delineation and calculation of coal Resources, a LOM plan was
 
generated for Curragh.
 
The
Mine plan was generated
 
based on the forecast
 
mine plan and permit
 
plan using current property
 
control limits,
modifications to geologic mapping, or other factors determined
 
during the evaluation.
At the Curragh, a minimum mining height of 0.5 metres was used for open cut operations being employed.
 
Coal
seams
 
thinner
 
than
 
the
 
assigned
 
mining
 
height
 
and
 
greater
 
than
 
45%
 
insitu
 
ash
 
were
 
assigned
 
to
 
waste.
 
A
dilution of 225mm and a coal loss of 125mm were applied to every seam. Plant recovery is a function of in-seam
recovery and plant efficiency factor.
 
ROM and product data outputs from the LOM plan sequencing
 
were processed into reports and summarized on
an annual basis for
 
processing into the economic model. Product tonnes
 
are reported at 11 percent moisture and
represent the saleable product from the Property.
 
Pricing data
 
as provided
 
by
 
Coronado
 
marketing
 
team
 
is based
 
on internationally
 
recognised
 
forecasting
 
and
Curragh’s own view.
The coal
 
Resource mapping
 
and estimation
 
process, described
 
in the
 
report, was
 
used as
 
a basis
 
for the
 
coal
reserve estimate.
 
Proven and probable coal Reserves were derived from
 
the defined coal Resource considering
relevant
 
processing,
 
economic
 
(including
 
technical
 
estimates
 
of
 
capital,
 
revenue,
 
and
 
cost),
 
marketing,
 
legal,
environmental, socio-economic, and regulatory factors
 
and are presented on a moist, recoverable basis.
Points of observation include exploration
 
drill holes, degas holes, and mine
 
measurements which have been fully
vetted and processed into
 
a geologic model.
 
The geologic model is
 
based on seam depositional
 
modelling, the
interrelationship
 
of
 
overlying
 
and
 
underlying
 
strata
 
on
 
seam
 
mineability,
 
seam
 
thickness
 
trends, the
 
impact
 
of
seam
 
structure
 
(i.e.,
 
faulting),
 
intra-seam
 
characteristics,
 
etc.
 
Once
 
the
 
geological
 
model
 
was
 
completed,
 
a
statistical analysis, described
 
in Section 11.1.1
 
was conducted and up
 
to a 1 kilometre
 
radius from a valid
 
point
of observation was selected to define Measured Resources
 
.
 
Likewise,
 
the
 
distance
 
between
 
1
 
and
 
2
 
of
 
a
 
kilometre
 
radius
 
was
 
selected
 
to
 
define
 
Indicated
 
Resources.
 
Indicated Resources may convert to Probable Reserves
 
.
 
No Inferred coal was used in the Reserve estimation
12.2
 
Qualified Person Credentials
Mr. Paul
 
Wood BE
 
(Mining) MAusIMM(CP)
 
possesses the
 
necessary experience
 
and credentials as
 
a member
of the AusIMM to serve as a Qualified Person
 
for this TRS.
12.3
 
Qualified Person ’s Opinion
It is the opinion
 
of Mr.
 
Paul Wood that
 
the estimates accurately
 
reflect Reserves
 
as defined by the
 
JORC Code
and
 
SEC.
 
Sufficient
 
exploration
 
data
 
is
 
supported
 
by
 
a
 
longstanding
 
history
 
of
 
successful
 
coal
 
production
 
at
Curragh, further
 
increasing
 
the confidence
 
of the
 
reserve
 
estimates.
 
The application
 
of
 
modifying
 
factors
 
are
supported by a combination of laboratory-based data
 
and practical historical knowledge at Curragh.
13
Mining Methods
 
Coal
 
mine
 
development
 
at
 
Curragh
 
is
 
accomplished
 
by
 
surface
 
mining
 
methods
 
and
 
has
 
been so
 
historically
since
 
the
 
mine’s
 
inception.
 
The
 
mine
 
characteristics
 
and
 
output
 
levels
 
allow
 
it
 
to
 
be
 
ranked
 
as
 
a
 
large
 
coal
operation
 
when
 
compared
 
to
 
domestic
 
producers
 
in
 
Australia
 
and
 
worldwide.
 
Because
 
of
 
its
 
size
 
Curragh
operates 4 large electric draglines, 1 large electric
 
shovel and a fleet of smaller contractor excavators. These are
typical of large
 
open cut mines
 
in the Bowen
 
Basin in Central
 
Queensland as they
 
offer the cheapest
 
and most
productive ways of stripping large amounts overburden. These
 
mining methods are used for the
 
life of mine plan.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 46 of 76
Life of mine planned production
 
rates vary from 3 Mt
 
ROM per annum (pa) at
 
the end of the schedule
 
to a peak
of 18 Mt ROM
 
pa based on
 
the amount of
 
digger fleets deployed.
 
The mining sequence
 
starts
 
with clearing the
vegetation,
 
removing
 
the topsoil
 
and stockpiling
 
for rehabilitation.
 
Where
 
an area
 
can be
 
dug without
 
blasting
excavators
 
free
 
dig
 
the
 
overburden,
 
otherwise
 
drills
 
are
 
placed
 
on
 
the
 
bench
 
and
 
the
 
area
 
is
 
drilled
 
out
 
then
loaded with explosives and blasted.
 
If the depth of
 
overburden is too deep for
 
the dragline to reach
 
top of coal,
 
truck and excavators mine the
 
material
down to the dragline working
 
height, this material is
 
placed in low wall dumps
 
in the dragline spoil. The
 
dragline
is then scheduled to remove the remaining overburden material. The final step in
 
the coal extraction sequence is
coal mining. Once the
 
face has advanced far
 
enough the low wall
 
dumps are contoured and
 
the stockpiled topsoil
placed onto the contoured surface, this signals the start
 
of the rehabilitation process.
Total
 
waste volume stripped varies between 19 Mbcm pa to
 
208 Mbcm pa.
Product coal is washed in 2 coal preparation plants, life of mine product
 
varies between 2 Mt pa at the end of the
schedule to 13 Mt pa.
Coal loss and dilution by
 
seam is highlighted in
 
In addition, any seam with
 
an insitu ash greater than
45% is wasted as is any seam less than 0.5m thick.
Table 13-1
ITEM
 
 
Unit
 
 
Value
 
R&F Loss
m
0.15
R&F Dilution
m
0.23
Overall loss factor
%
2.0
Dilution density
t/bcm
2.4
Dilution Ash
%
90
Plans are being
 
made to mine
 
final high walls
 
using high wall
 
mining methods,
 
production rates
 
vary from 30Kt
ROM to 70Kt ROM per month.
The scheduled
 
mine life
 
is highlighted
 
in
 
and
 
Mining block
 
dimensions are
 
100m *
70m.
13.1
 
Geotech and Hydrology
The main geotechnical influence is related to geostructural factors. One feature, the Jellinbah thrust fault, affects
key portions of the pit design
 
and stability.
 
The regional angle of dip
 
of both rock and coal strata
 
is 3 degrees to
the East direction, however there are sectors with localized angles
 
as high as 25 degrees, which require greater
geotechnical attention due to structural disturbances.
 
Geotechnical design at
 
Curragh is evaluated
 
with a modern
 
and well-established blend
 
of analytical and
 
empirical
methods. There is
 
an emphasis on the
 
various parameters of rock
 
discontinuities, e.g. bedding and
 
joint systems,
including
 
Geomechanics
 
Classification
 
with
 
the
 
determination
 
of
 
rock
 
mass
 
rating
 
(RMR)
 
and
 
compared
 
to
components of the Q-System. Based on this work, the
 
typical site wide design slope
 
angles are
Highwall slopes:
β = 65 degrees
Endwall slopes:
β = 53 degrees
 
Shallower
 
design
 
face
 
angles
 
are
 
used
 
for
 
areas
 
of
 
intensive
 
fracturing
 
or
 
other
 
negative
 
geotechnical
characteristics. The
 
overall pit
 
geometry at
 
Curragh North
 
is highlighted
 
in
 
These design
 
angles
have proven effective in managing slope stability.
Truck and
 
excavator waste
 
dumps are typically
 
designed with slope
 
angles between
 
35 and 37
 
degrees, these
are placed over the top of dragline spoil.
 
shows a typical design for Curragh North.
 
ex961p47i1.jpg ex961p47i0.jpg
 
Page 47 of 76
Figure 13-1: Waste (Spoil) Dump Curragh North
The mining
 
engineering approach
 
at Curragh
 
includes a
 
system for
 
managing the
 
geotechnical risk,
 
and when
applicable, the implementation
 
of control and
 
corrective actions. This
 
geotechnical risk management
 
is performed
before mining commences in each strip, the work covers:
●
 
identification of geotechnical hazards
●
 
planning and design of risk controls
●
 
monitoring performance against design
●
 
devising controls and triggering action responses
●
 
managing change
●
 
formal audit and review process
Ground water mostly
 
impacts coal mining
 
and is managed
 
by in pit
 
pumping. Ground
 
water can also
 
affect low
wall stability
 
unless managed
 
effectively
 
via in
 
pit pumping.
 
The average
 
rainfall
 
is relatively
 
small in
 
quantity,
approximately 630 mm
 
per year. Water bearing strata
 
are generally found
 
in the sand
 
and gravel alluvial
 
deposits.
 
The
 
interburden
 
in the
 
Rangal
 
formation
 
can
 
be
 
an
 
aquifer,
 
but
 
it
 
is typically
 
confined
 
by
 
impermeable
 
layers
except at the outcrop.
 
The coal seams are the principle aquifers in the Rangal
 
Coal Measures.
Mine management at Curragh monitors groundwater inflows and
 
maintains comprehensive models.
Figure 13-2
 
and Figure
 
13-3 highlight
 
the total
 
waste moved
 
and coal
 
mined in
 
the 2021
 
life of
 
mine schedule
that supports the disclosure of coal reserves.
Figure 13-2: Total Waste by Activity
 
ex961p48i0.jpg
 
Page 48 of 76
Notes DL = dragline, TS = Truck and Shovel, TE = Truck and Excavator.
Figure 13-3: Coal Mined
Notes Cu = Curragh CN = Curragh North MDL
 
= Mineral Development License.
Contractors are employed for the pre strip, post strip and
 
coal mining activities. Thiess currently operate
 
9 fleets
at
 
Curragh
 
North,
 
while
 
Goldings
 
currently
 
operate
 
7
 
fleets
 
at
 
Curragh.
 
The
 
life
 
of
 
mine
 
plan
 
excavators
 
are
highlighted in
, up to
 
20 fleet
 
are scheduled,
 
however,
 
the maximum
 
fleet size
 
in any
 
single year
 
is
17. Operations are conducted around the clock on day
 
and night shift.
 
 
ex961p49i0.gif
 
Page 49 of 76
Table 13-2
Additional
 
production
 
equipment
 
includes
 
4 electric
 
draglines,
 
shared
 
between
 
Curragh
 
North
 
and
 
Curragh,
 
a
fleet
 
of
 
overburden
 
drills
 
and
 
dozers.
 
Ancillary
 
support
 
equipment
 
includes
 
graders,
 
water
 
trucks
 
and
 
mining
equipment floats.
 
 
ex961p50i0.jpg
 
Page 50 of 76
Figure 13-4: Final Mined Reserves
14
Process and recovery methods
 
14.1
 
Description
Curragh has two coal
 
preparation plants CPP1
 
and CPP2. CPP1
 
is the oldest
 
of the two processing
 
plants and
has
 
a
 
documented
 
nameplate
 
capacity
 
of
 
1100
 
t/h
 
(as
 
received).
 
The
 
CPP
 
processes
 
the
 
32mm
 
x
 
0.7
 
mm
fractions
 
through
 
a
 
2-stage
 
dense
 
medium
 
cyclone
 
(“DMC”)
 
circuit
 
operating
 
in
 
a
 
low
 
density
 
/
 
high
 
density
 
 
Page 51 of 76
configuration to produce a low ash primary and a
 
high ash secondary product respectively.
 
The primary cyclone
underflow has the functionality to bypass the secondary
 
DMC circuit and report directly as a secondary product.
The minus 0.7 mm fraction is directed to a
 
Jameson cell flotation circuit for processing. The concentrate from the
flotation
 
circuit
 
is
 
pre-thickened
 
via
 
classifying
 
cyclones
 
before
 
reporting
 
to
 
horizontal
 
belt
 
vacuum
 
filters
 
and
screen
 
bowls
 
for further
 
dewatering
 
prior
 
to
 
being
 
conveyed
 
to
 
the
 
primary
 
product
 
conveyor.
 
The
 
classifying
cyclone overflow is directed to
 
a coal thickener,
 
where the thickened product material
 
is then combined with the
horizontal belt vacuum filter feed.
 
These processing methods are typical
 
of what is used
 
at other coal mines throughout
 
the Bowen Basin in Central
Queensland, the technology is tried and proven.
CPP 2 has a
 
documented nameplate capacity
 
of 1200 t/h (as
 
received) with a capability
 
of up to 1350
 
t/h when
processing selected feed types.
CPP2 largely mirrors CPP 1 with the following exceptions.
●
 
Raw coal
 
screens have
 
been installed
 
as an
 
option to
 
separate the
 
plant feed
 
material into
 
a plus
 
and
minus
 
12
 
mm
 
size
 
fraction.
 
This
 
functionality
 
directs
 
the
 
higher
 
ash,
 
coarse
 
fraction
 
directly
 
to
 
the
secondary dense medium circuit reducing the circuit loading
 
of the primary circuit.
●
 
A spirals
 
circuit
 
has been
 
included
 
in
 
the
 
plant
 
to
 
reprocess
 
the flotation
 
tailings
 
stream.
 
The
 
product
stream
 
from
 
the
 
spirals
 
circuit
 
is
 
directed
 
to
 
a
 
splitter
 
box
 
which
 
allows
 
the
 
recovered
 
product
 
to
 
be
diverted to
 
either
 
the primary
 
product or
 
secondary
 
product streams
 
via the
 
screen-bowls
 
or fine
 
coal
centrifuges respectively.
 
 
 
ex961p52i0.jpg
 
Page 52 of 76
Figure 14-1: Aerial view of the CHPP facilities and associated
 
infrastructure
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 53 of 76
14.1.1
 
Raw Coal Handling
The 22
 
km overland conveyor
 
from Curragh North
 
is an
 
integral component of
 
the coal transportation
 
and logistics
system at
 
Curragh operation.
 
The two
 
ROM systems
 
are important
 
features of
 
the mine
 
operations
 
to ensure
blending of the ROM
 
coals for the CPPs.
 
A series of conveyors,
 
a ROM crushed
 
stockpile and small
 
ROM bins
allows flexibility in the operations
 
of the two CPPs, however this flexibility.
14.1.2
 
Product Handling
Product
 
coal
 
is
 
stockpiled
 
on
 
to
 
either
 
the
 
primary
 
or
 
secondary
 
product
 
stockpiles.
 
Two
 
stockpiles
 
of
approximately
 
190,000
 
tonnes
 
each
 
are
 
available
 
for
 
metallurgical
 
and
 
steaming
 
coal
 
products.
 
Multiple
stockpiles of differing
 
quality can be built
 
on the overall stockpile
 
footprint and reclaimed discretely
 
by means of
the 4400
 
t/h bucket
 
wheel reclaim
 
system. The
 
two installed
 
product stacker
 
s
 
have the
 
capability
 
to slew
 
180
degrees and stack to an emergency stockpile area. The emergency
 
stockpile area is not able to be recovered.
14.1.3
 
Train Loadout
The processed
 
coal is
 
loaded onto
 
trains via
 
a single
 
dedicated bucket
 
wheel reclaimer
 
which loads
 
two 580
 
t
capacity
 
bins,
 
designed
 
to
 
load
 
both
 
thermal
 
and
 
metallurgical
 
coal.
 
In
 
an
 
emergency,
 
there
 
is
 
a
 
dozer
 
push
loading system in place should there an electrical outage at the mine site, which reduces the risk of train loading
system.
14.1.4
 
Reject and Tailings
Coarse reject is conveyed from each CPP
 
to a common reject bin for collection
 
by mine trucks and deposited
 
in
the allocated
 
reject dump,
 
as capping
 
material for
 
the tailings
 
dam or
 
as part
 
of the
 
rehabilitation process. Flotation
tailings
 
material
 
is
 
passed
 
through
 
thickening
 
cyclones
 
with
 
the
 
underflow
 
directed
 
to
 
a
 
fine
 
coal
 
dewatering
screen
 
for
 
dewatering.
 
The
 
screen
 
overflow
 
is
 
combined
 
with
 
the
 
coarse
 
reject
 
material
 
and
 
conveyed
 
to
 
the
reject bin.
 
The remaining
 
flotation tailings
 
material from
 
either CPP
 
is directed
 
to dedicated
 
tailings thickeners
with the
 
underflow
 
pumped
 
to the
 
tails
 
storage
 
facility
 
(TSF).
 
The LOM
 
TSF
 
is currently
 
a
 
project
 
in
 
progress
assessing the use
 
of the void
 
at Pit B.
 
Water recovered
 
from the in-pit
 
TSF is included
 
as part of
 
the site water
balance model and is reused within the site to offset the
 
volume of purchased raw water.
14.1.5
 
Operating performance
The
 
two
 
processing
 
plants
 
have
 
a
 
nominal
 
nameplate
 
throughput
 
capacity
 
of
 
2300
 
t/h
 
on
 
a
 
combined
 
basis.
Applying the
 
nominal throughput
 
capacity
 
with
 
industry
 
standard
 
practice of
 
6500
 
– 7000
 
operating
 
hours
 
per
annum the range of achievable operating plant throughput
 
would be as follows:
Table 14-1: CPP Capacity
Nameplate Feed
(t/hr)
Operating Hours
(per year)
Plant
Throughput (t
per year)
Forecast Yield (%)
Total Processed
Product (t per
year)
2,300
6,500
14,950,000
78
11,661,000
2,300
7,000
16,100,000
78
12,558,000
Historical
 
operating
 
performance
 
indicates
 
that
 
the
 
combined
 
facilities
 
have
 
achieved
 
a
 
maximum
 
processed
throughput of 15.2 Mtpa
 
ROM in recent years
 
and would require further
 
increases in utilised hours
 
to be achieved
to exceed this value. The ability to bypass selected raw feed material directly as a thermal product is considered
an accepted site practice and
 
where quality shortfalls
 
are realised can be blended
 
with washed thermal product
to achieve the required product specification and the required
 
annual product volumes.
 
 
 
Page 54 of 76
15
Infrastructure
 
Curragh owns
 
and operates
 
the necessary
 
coal load-out
 
system for
 
dispatches via
 
rail line
 
to the
 
port at
 
Gladstone
or the Stanwell Power Plant.
 
Moreover, the
 
mine has maintenance facilities
 
for the fleet of mining
 
equipment as
well as office buildings for the mine staff
 
and personnel.
 
15.1.1
 
Water
Curragh obtains its water requirement from two main
 
sources:
A supply agreement with SunWater Ltd (“SunWater”)
 
from the Bedford Weir and Fairburn Dam
Pollution control dams and old pits that capture rainfall and water
 
from dewatering activities.
Curragh is also entitled to draw 708 M gallons per year through an offtake agreement with SunWater.
 
Recycling
can significantly reduce the need for purchased water.
 
15.1.2
 
Power
Curragh has
 
a dedicated
 
66kv
 
power supply
 
to support
 
the mining
 
operations
 
with
 
a capacity
 
of up
 
to 57MW
sourced from the main
 
grid power.
 
The substation is located on
 
the southwest corner of the
 
lease and both 66kv
and 22kv distribution networks
 
to supply the draglines, shovel and CHPP.
 
Part of the site electrical system
 
was
upgraded in 2015 at the time of upgrading the ROM crushing
 
station.
CCPL’s
 
forecast plans
 
for Curragh
 
suggest that
 
the power
 
needs of
 
the mining
 
operations can
 
be met with
 
the
current system and supply contracts.
15.1.3
 
Roads
Curragh
 
has
 
a
 
network
 
of
 
haul
 
roads
 
and
 
ramps
 
connecting
 
the
 
various
 
working
 
areas
 
with
 
the
 
operation.
 
Established
 
national
 
primary
 
highways
 
such
 
as
 
Route
 
A4
 
(Capricorn
 
Highway)
 
connect
 
and
 
run
 
through
Blackwater and between the town to Emerald to the west
 
and Rockhampton to the east.
15.1.4
 
Rail
Curragh is linked to the main
 
Blackwater rail link to the Port of
 
Gladstone’s RG Tanna
 
Coal Terminal (RG Tanna)
and Wiggins Island
 
Coal Export Terminal (WICET) coal terminals by
 
dedicated rail loop
 
balloon with a
 
Marketable
Coal capacity of 14 million tonnes per year.
 
Train capacity averages 8,500 tonnes at a loading capacity of 4,400
t/h with an average 28 trains loaded every week (with a maximum
 
capacity of 36 trains).
Curragh is located 290 km
 
from the Port of Gladstone.
 
Under an existing agreement,
 
CCPL has the right to
 
rail
up to 11.0
 
Mtpa, plus surge of rail capacity
 
on the Blackwater system.
 
This network is operated by Aurizon
 
and
links Central
 
Queensland
 
mines from
 
the Bowen
 
Basin to
 
two export
 
terminals
 
at the
 
Port of
 
Gladstone
 
– RG
Tanna
 
and WICET,
 
under two long term rail haulage agreements with
 
Aurizon.
Domestically,
 
Curragh’s steam
 
coal is
 
railed 160
 
km to
 
the Stanwell
 
Power Station
 
near Rockhampton.
 
Under
the Stanwell Coal Agreement, Stanwell is
 
responsible for the transport of the
 
steam coal to the power station
 
and
pays for the railing costs.
15.1.5
 
Port
Curragh’s export coal
 
is shipped either from
 
RG Tanna
 
or WICET terminals at
 
Gladstone.
 
The coal is blended
at the port to meet market requirements.
There are
 
agreements in
 
place for
 
approximately 8.6
 
million tonnes
 
per year
 
in exports
 
from RG
 
Tanna
 
and a
take or pay agreement with WICET for 1.5 million tonnes
 
per year.
 
 
ex961p55i0.jpg
 
Page 55 of 76
Figure 15-1: Curragh Preparation Plant Infrastructure
16
Market studies
 
16.1
 
Market Description
Coronado maintains a specialist marketing
 
team that focusses on direct
 
sales of Curragh products
 
to steel mills
in all
 
major international
 
markets.
 
Coronado coals
 
are widely
 
technically tested
 
and approved
 
for use
 
in coke
making
 
blends,
 
with
 
product
 
positioning
 
optimised
 
over
 
many
 
years
 
in
 
the
 
market.
 
Curragh
 
coals
 
are
 
widely
known
 
for
 
their
 
low
 
ash,
 
low
 
to
 
mid
 
volatile
 
matter,
 
low
 
Sulphur
 
and
 
low
 
Phosphorous
 
content.
 
Curragh
 
 
 
 
 
 
 
 
 
 
Page 56 of 76
Metallurgical
 
Coal
 
products
 
are
 
also
 
known
 
for
 
their
 
consistent
 
delivered
 
quality
 
which
 
supports
 
a
 
consistent
offtake across a diversified market base.
Table 16-1: Coal Quality for Washed Products
Seam
Primary
 
Yield (%)
Secondary
Yield (%)
CSN
Primary
Comments
Cancer
~30 @ 9% Ash
30
7 - 8
~0.5m thick.
 
Typically,
 
a Coking Coal blend
Aries
~50 @ 9% Ash
20 - 30
6 - 7
Aries Lower has
 
better Coking Coal properties
 
and
higher CSN
 
than Aries
 
Upper, also
 
has fluidity
 
50-
100 ddpm.
 
Aries Upper
 
typically produces
 
a high-
ash blend PCI.
Castor Lower
45 - 50 @ 8% Ash
30 - 35
7 - 8
A high quality coking
 
coal seam with
 
strong swelling
and
 
plastics
 
and
 
an
 
important
 
coking
 
coal
 
blend
component.
 
Good
 
middlings
 
blend
 
product
 
for
steam coal.
Pollux
~45 @ 7% Ash
30 - 35
6.5 - 7.5
A low
 
ash
 
Coking
 
coal
 
blend coal,
 
Pollux
 
has low
plastic
 
properties.
 
The
 
middlings
 
product
 
is
 
a
 
key
high Ash PCI blend component.
Pisces
 
Working
Section
UWS:
 
~80 @ 9% Ash,
mainly PCI
-
<3
Split
 
into
 
upper
 
working
 
section
 
(UWS)
 
and
 
lower
working section
 
(LWS).
 
The UWS
 
products a
 
low
ash PCI product for PCI blend. The
 
LWS middlings
typically produces a high-ash (12%) PCI.
LWS:
 
~45 @ 7.5%
Ash
30 - 35
6.5 - 7.5
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 57 of 76
16.2
 
Price Forecasts
Coronado’s
 
price
 
outlook
 
incorporates
 
data
 
from
 
independent
 
external
 
analysis
 
of
 
global
 
supply
 
and
 
demand
trends and is and
 
is supplemented with Coronado’s in-house knowledge
 
of applicable rail transportation
 
charges,
ocean freight charges and port charges.
 
Price assumptions
 
for Curragh
 
are given
 
in
. These are
 
based on the
 
CY22 annual mine
 
economic
analysis &
 
used for internal
 
optimization processes,
 
final blended products
 
for sale
 
may be different.
 
Financial
modelling to support reserve classification utilizes the prices
 
as discussed in the financial section.
Table 16-2: Coal Pricing
Product
USD/T
Metallurgical Coal
 
168
Export Thermal Coal
99
Total
143
Domestic thermal sales tonnes are sold to
 
Stanwell at based on the Stanwell Coal
 
Supply agreement described
in 16.3
16.3
 
Contract Requirements
Material contracts considered in the economic evaluation
 
of Curragh include:
Stanwell
We are
 
party to
 
contractual arrangements
 
with Stanwell,
 
including a
 
Coal Supply
 
Agreement, or
 
the CSA,
 
and
the Curragh Mine New Coal Supply Deed, dated August
 
14, 2018, or the Supply Deed.
Under the CSA, we deliver thermal coal from Curragh to Stanwell at an agreed price and quantity.
 
Stanwell may
vary the quantity of thermal coal purchased each year so the total quantity to be delivered to Stanwell each year
cannot
 
be
 
precisely
 
forecast.
 
The coal
 
that
 
we
 
supply
 
to Stanwell
 
constitutes
 
the
 
majority
 
of the
 
thermal
 
coal
production from Curragh. Our
 
cost of supplying coal
 
to Stanwell was greater
 
than the price paid
 
by Stanwell for
the year ended December 31, 2021.
 
Under the CSA, we also
 
share part of the revenue earned from
 
export Met coal sales (from particular
 
Tenements
(as defined below))
 
with Stanwell
 
through various
 
rebates. The
 
most material
 
rebate is
 
the export
 
price rebate,
which is linked to the realized export coal price for a defined
 
Met coal product, as follows:
●
 
For the
 
first 7.0 MMtpa
 
of export coal
 
sales: when
 
the 12-month trailing,
 
weighted-average realized export
coal price of Reference coal exceeds the Tier
 
1 Rebate Coal Floor Price, we pay a rebate of
 
25% of the
difference between the realized export coal price and
 
the Tier 1 Rebate Coal Floor
 
Price.
●
 
For export
 
coal sales
 
above 7.0
 
MMtpa: when
 
the 12-month
 
trailing, weighted-average
 
realized export
coal price of Reference coal exceeds the Tier
 
2 Rebate Coal Floor Price, we pay a rebate of
 
10% of the
difference between the realized export coal price
 
and the Tier 2 Rebate Coal Floor
 
Price.
The CSA also provides for:
●
 
a tonnage rebate to Stanwell per Mt on the first 7.0 MMtpa of export coal sales and on export coal sales
above 7.0 MMtpa; and
●
 
a rebate on run-of-mine, or ROM, coal mined in the Curragh “Pit U
 
East Area.”
The total Stanwell rebate for the
 
year ended December 31, 2021, was $55.4
million and has been included in the
consolidated statements of operations included -in the
 
Annual Report on Form 10-K.
The Supply
 
Deed grants
 
us the
 
right to
 
mine the
 
coal reserves
 
in the
 
Stanwell Reserved
 
Area, or
 
the SRA.
 
In
exchange, we agreed to certain amendments to the CSA and to
 
enter into a New Coal Supply Agreement, or the
 
 
Page 58 of 76
NCSA upon the
 
expiration of the
 
CSA (which is
 
expected to occur
 
in 2027).
 
On July 12,
 
2019, we entered
 
into
the
 
NCSA
 
with
 
Stanwell.
 
From
 
the
 
earlier
 
of
 
the
 
expiry
 
of
 
the
 
CSA,
 
the
 
date
 
of
 
termination
 
of
 
the
 
CSA,
 
and
January 1, 2029, we
 
will continue to supply
 
thermal coal to
 
Stanwell under the
 
NCSA. The term of
 
the NCSA is
expected to be 10 years,
 
and Coronado will supply
 
to Stanwell 2 million ‘Tonnes
 
Equivalent’ of thermal coal
 
per
annum (based
 
on a
 
nominal gross
 
calorific value
 
of 25.6GJ)
 
at a
 
fixed contract
 
price that
 
varies in
 
accordance
with agreed formulae, inclusive
 
of all statutory charges and
 
royalties in respect of
 
coal sold and delivered under
the NCSA. The export rebates which were payable under the CSA are not payable during the term of the NCSA.
 
The
 
supply
 
term,
 
the
 
contract
 
tonnage
 
and
 
the
 
contract
 
price
 
under
 
the
 
NCSA
 
are
 
subject
 
to
 
adjustment
 
in
accordance with a financial
 
model agreed between Stanwell
 
and us. In summary,
 
we have agreed that
 
the total
value of the
 
discount received
 
by Stanwell
 
on coal
 
supplied to
 
it under
 
the NCSA
 
should (by
 
the expiry
 
date of
the NCSA) be equal to
 
the net present value of A$210
 
million as at the date
 
of the Supply Deed.
 
The net present
value
 
of
 
the
 
deferred
 
consideration
 
was
 
$230.5
million
 
as
 
of
 
December
 
31,
 
2021.
 
On
 
January
 
18,
 
2021,
 
the
Option Coal Supply
 
Agreement, or the
 
OCSA, contemplated by
 
clause 5 of
 
the NCSA was
 
entered into, in
 
respect
of the supply of certain additional coal to Stanwell during
 
the term of the NCSA
Rail Services
Curragh is
 
linked to
 
the Blackwater
 
rail line
 
of the
 
Central Queensland
 
Coal Network,
 
or CQCN,
 
an integrated
coal
 
haulage
 
rail system
 
owned
 
and
 
operated
 
by
 
Aurizon
 
Network
 
Pty Ltd.,
 
or
 
Aurizon
 
Network.
 
Curragh
 
has
secured
 
annual
 
rail
 
haulage
 
capacity
 
of
 
up
 
to
 
12.0
MMtpa
 
(plus
 
surge
 
capacity)
 
under
 
long-term
 
rail
 
haulage
agreements with Aurizon
 
Operations Limited, or
 
Aurizon Operations, and
 
Pacific National Holdings
 
Pty Limited,
or Pacific National.
 
The RGTCT Coal
 
Transport Services
 
Agreement with Aurizon
 
Operations is for
 
8.5 MMtpa of
 
haulage capacity
to RGTCT. Curragh pays a minimum monthly charge (components of which are payable on a take-or-pay basis),
which is calculated with reference
 
to the below-rail access charges,
 
haulage/freight charges, a minimum
 
annual
tonnage
 
charge
 
and
 
other
 
charges.
 
The
 
RGTCT
 
Coal
 
Transport
 
Services
 
Agreement
 
terminates
 
on
 
June 30,
2030.
The Coal Transport
 
Services Agreement
 
with Pacific
 
National is
 
for 1.0
 
MMtpa of
 
haulage capacity
 
to RGTCT.
Curragh pays
 
a minimum
 
monthly charge
 
(components of
 
which are
 
payable on
 
a take-or-pay
 
basis), which
 
is
calculated with reference to the below-rail
 
access charges, haulage/freight charges, a
 
minimum annual tonnage
charge and other charges. The
 
Coal Transport Services
 
Agreement with Pacific National
 
terminates on July 31,
2029.
 
The
 
Wiggins
 
Island
 
Rail
 
Project,
 
or
 
WIRP,
 
Transport
 
Services
 
Agreement
 
with
 
Aurizon
 
Operations
 
is
 
for
 
2.0
MMtpa of capacity to WICET.
 
This contract is effectively
 
100% take-or-pay (for a
 
portion of the rail haulage
 
and
all capacity access charges). This agreement expires on June
 
30, 2030.
Port Services
Curragh exports
 
coal through
 
two terminals
 
at the
 
Port of
 
Gladstone, RGTCT
 
and WICET.
 
At RGTCT,
 
we and
Gladstone Port Corporation
 
Limited, or GPC, are
 
parties to a coal
 
handling agreement that
 
expires on June 30,
2030. The agreement
 
may be renewed
 
at our request
 
and, subject to
 
certain conditions, GPC is required
 
to agree
to
 
the
 
extension
 
if
 
there
 
is
 
capacity
 
at
 
RGTCT
 
to
 
allow
 
the
 
extension.
 
We
 
currently
 
have
 
the
 
right
 
to
 
export
between 7.7 MMtpa and 8.7 MMtpa at our nomination on a
 
take-or-pay basis.
We have
 
a minority
 
interest
 
in WICET
 
Holdings
 
Pty Ltd, whose
 
wholly-owned
 
subsidiary,
 
Wiggins Island
 
Coal
Export Terminal
 
Pty Ltd, or WICET Pty Ltd, owns WICET.
 
Other coal producers who export coal through WICET
also hold
 
shares
 
in
 
WICET
 
Holdings
 
Pty Ltd.
 
In addition,
 
we and
 
the
 
other
 
coal
 
producers
 
(or
 
shippers)
 
have
take-or-pay agreements with WICET Pty
 
Ltd and pay a terminal handling charge
 
to export coal through WICET,
which is
 
calculated
 
by reference
 
to WICET’s
 
annual operating
 
costs, as
 
well as
 
finance costs
 
associated with
WICET
 
Pty Ltd’s
 
external
 
debt
 
facilities.
 
Our
 
take-or-pay
 
agreement
 
with
 
WICET
 
Pty Ltd,
 
or
 
the
 
WICET
Take
 
-or-Pay
 
Agreement,
 
provides
 
Curragh
 
with
 
export
 
capacity
 
of
 
1.5
 
MMtpa.
 
The
 
WICET
 
Take
 
-or-Pay
Agreement is an “evergreen”
 
agreement, with rolling ten-year
 
terms. If we inform
 
WICET Pty Ltd that we
 
do not
wish to continue to roll the term
 
of the WICET Take
 
-or-Pay Agreement, the term
 
would be set at nine years
 
and
the terminal handling
 
charge payable
 
by us would
 
be increased so
 
that our
 
proportion of WICET
 
Pty Ltd’s debt
is amortized to nil by the end of that nine-year term.
 
 
 
Page 59 of 76
Under
 
the
 
WICET
 
Take
 
-or-Pay
 
Agreement,
 
we
 
are
 
obligated
 
to
 
pay
 
for
 
that
 
capacity
 
via
 
terminal
 
handling
charges, whether utilized or not. The terminal handling charge payable by us can be adjusted by WICET
 
Pty Ltd
if
 
our
 
share
 
of
 
WICET
 
Pty Ltd’s
 
operational
 
and
 
finance
 
costs
 
increases,
 
including
 
because
 
of
 
increased
operational costs or because another shipper defaults
 
and has its capacity reduced to nil. The terminal handling
charge is subject
 
to a financing
 
cap set out
 
in the terminal
 
handling charge methodology
 
and has already
 
been
reached and
 
is in force.
 
If another shipper
 
defaults under
 
its take-or-pay
 
agreement, each
 
remaining shipper
 
is
effectively proportionately liable to pay that defaulting shipper’s share of WICET Pty Ltd’s costs going forward, in
the form of increased terminal handling charges.
If we default under the
 
WICET Take
 
-or-Pay Agreement, we would
 
be obligated to pay a
 
termination payment to
WICET
 
Pty Ltd.
 
The
 
termination
 
payment
 
effectively
 
represents
 
our
 
proportion
 
of
 
WICET
 
Pty Ltd’s
 
total
 
debt
outstanding, based
 
on the
 
proportion of
 
our contracted
 
tonnage to
 
the total
 
contracted
 
tonnage of
 
shippers
 
at
WICET at
 
the time
 
the payment
 
is triggered.
 
Shippers can
 
also become
 
liable to
 
pay the
 
termination
 
payment
where there is a permanent cessation of operations at WICET.
 
Since WICET began shipping export tonnages in
April
 
2015,
 
four
 
WICET
 
Holdings
 
Pty Ltd
 
shareholders
 
have
 
entered
 
into
 
administration
 
and
 
Take
 
-or-Pay
Agreements subsequently terminated, resulting
 
in the aggregate
 
contracted tonnage of shippers
 
decreasing from
27 MMtpa to 15.5 MMtpa.
Under the WICET Take
 
-or-Pay Agreement, we are required
 
to provide security (which is
 
provided in the form of
a bank guarantee). The amount of
 
the security must cover our estimated liabilities as
 
a shipper under the WICET
Take
 
-or-Pay Agreement for the following twelve-month period. If
 
we are in default under
 
the WICET Take-or-Pay
Agreement and
 
are subject
 
to a
 
termination payment,
 
WICET Pty Ltd
 
can draw
 
on the
 
security and
 
apply it
 
to
amounts
 
owing
 
by us.
 
See
 
Item 1A. “Risk
 
Factors—Risks
 
related to
 
our
 
investment
 
in
 
WICET
 
may adversely
affect our
 
financial condition
 
and results
 
of operations”
 
and Item 7.
 
“Management’s
 
Discussion and
 
Analysis of
Financial Condition
 
and Results
 
of Operations—Liquidity
 
and Capital
 
Resources”
 
for additional
 
information
 
on
our take-or-pay obligations.
During 2019, Coronado
 
entered into an
 
Agreement with Washpool
 
Coal Pty Ltd
 
for assignment
 
of their WICET
capacity of 1.6 MMt per annum, on a take-or-pay basis
 
for a term to June 30, 2022,
 
at market rates.
Thiess Mining Services Contract
We currently use Thiess Pty Ltd, or Thiess, as
 
our primary mining contractor for our Australian Operations.
We
 
are
 
party
 
to
 
a
 
long-term
 
mining
 
contract
 
with
 
Thiess
 
to
 
provide
 
hydraulic
 
excavator
 
overburden
 
and
 
coal
mining,
 
pit
 
dewatering,
 
run
 
of
 
mine
 
rehandling
 
services
 
and
 
maintenance
 
of
 
Coronado
 
owned
 
heavy
 
mobile
equipment at the
 
Curragh North operation
 
until December 31,
 
2025, referred to
 
as Part A
 
Services; and to
 
provide
rope shovel
 
overburden removal
 
using Coronado’s
 
rope shovel
 
and Thiess
 
supplied ultra-class
 
truck services
until March 31, 2022,
 
referred to as Part
 
B Services. At any
 
time, the services can
 
be terminated for convenience,
subject
 
to
 
a
 
lump-sum
 
termination
 
payment.
 
We
 
are
 
currently
 
in
 
negotiations
 
with
 
Thiess
 
with
 
respect
 
to
 
the
arrangements beyond the expiry of the Part B Services.
17
Environmental studies,
 
permitting, and
 
plans, negotiations,
 
or
agreements with local individuals or groups
 
17.1
 
Results of Studies
Environmental and cultural heritage studies for approvals under Queensland
 
and Commonwealth legislation are
entailed with consideration of the following elements:
●
 
physical setting
●
 
impacts from operations
●
 
hydrology and water
●
 
terrestrial and aquatic fauna and flora
●
 
cultural heritage
 
 
Page 60 of 76
Besides mining, the
 
area affected by
 
the Curragh project
 
is used essentially
 
for low intensity cattle
 
grazing plus
some amount of dryland
 
cropping.
 
Most of the land
 
within the area are
 
currently disturbed as a
 
result of historical
grazing and mining activities.
 
Most of the original vegetation cover
 
has already been cleared for agricultural use,
except for a
 
few areas associated
 
with riparian vegetation
 
along the Mackenzie
 
River and its
 
tributaries as well
as the ephemeral Blackwater
 
Creek. The property has
 
therefore been the subject
 
of extensive activities prior
 
to
Curragh.
Curragh
 
has
 
complied
 
with
 
environmental
 
and
 
heritage
 
requirements
 
under
 
relevant
 
Queensland
 
and
Commonwealth legislation and
 
adhere to standard
 
practices for environmental
 
management set for
 
all coal mines
in
 
central
 
Queensland,
 
including
 
mitigation
 
of
 
impacts
 
on
 
cultural
 
heritage.
 
There
 
have
 
been
 
some
 
adverse
incidents, however,
 
the main ones being
 
spills of diesel fuel
 
(87,000 liters in 2016
 
and 25,000 liters in 2017),
 
as
well
 
occasions
 
of
 
minor
 
uncontrolled
 
or
 
non-compliant
 
water
 
releases.
 
Corrective
 
measures
 
have
 
remediated
these incidents where required.
 
Remediation of the main diesel spills is ongoing.
 
17.2
 
Requirements and Plans for Waste Disposal
General and Hazardous (Regulated)
 
solid waste at
 
Curragh is the
 
object of a
 
mandatory management plan under
the environmental license. General
 
waste is disposed at
 
an approved landfill site
 
at Curragh, while all regulated
waste is
 
transported
 
and treated
 
offsite
 
in an
 
environmentally
 
appropriate
 
manner
 
and in
 
compliance
 
with
 
the
Queensland
 
regulations.
 
The
 
mine
 
infrastructure
 
includes
 
two
 
Sewage
 
Treatment
 
Plants
 
(STP)
 
subject
 
to
conditions in
 
the environmental
 
license and
 
with the necessary
 
site procedures
 
in place.
 
These STPs
 
process
effluents from all office and camp/accommodation
 
facilities.
 
Industrial waste (tailings) from the CHPP is disposed of in
 
regulated structures, Tailings
 
Storage Facilities (TSF).
There are three
 
TSF at Curragh,
 
two in-pit and
 
one conventional above
 
ground TSF.
 
The above ground
 
TSF is
the original, complete and non-operational facility.
 
In-pit TSF is the process of backfilling abandoned pits, this is
currently the preferred method by the regulator.
 
Pit A TSF has limited remaining capacity and is non-operational
while Pit B TSF is an active facility with storage capacity of significant volume remaining and thus provides long-
term security for tailings
 
storage.
 
These locations are shown in
. All regulated structures are
 
subject
to ongoing inspection
 
by Curragh and
 
annual inspections
 
by an independent
 
Registered Professional
 
Engineer
of Queensland (RPEQ).
 
 
ex961p61i0.jpg
 
Page 61 of 76
Figure 17-1: Mine Waste Disposal Areas
17.3
 
Permit Requirements and Status
All applicable
 
environmental
 
licenses
 
and
 
permits
 
under
 
both
 
the
 
Queensland
 
and
 
Commonwealth
 
legislation
have been secured and
 
are in place. Work
 
is in progress to meet
 
the pre-mining monitoring and
 
studies to fulfill
requirements for ML’s
 
700006, 700007, 700008, and 700009 which are scheduled
 
for mining in later years.
17.4
 
Local Plans, Negotiations or Agreements
The Curragh Project includes three areas of Endangered Regional Ecosystem (EREs).
 
Reserves in these areas
have been downgraded to
 
account for long term protection
 
requirements.
 
The EREs or areas
 
of environmental
significance are associated with
 
the Mackenzie River
 
riparian vegetation and other
 
Brigalow communities located
within Curragh.
 
Under Commonwealth requirements, Curragh
 
has also provided
 
a biodiversity offset at
 
Mt. Flora,
 
 
Page 62 of 76
near
 
Nebo
 
in
 
Central
 
Queensland.
 
Further
 
biodiversity
 
offsets
 
are
 
required
 
under
 
obligations
 
related
 
to
 
the
Commonwealth and State approvals for ML700007 and
 
ML700008 and are in progress.
Curragh negotiated
 
a Cultural
 
Heritage Management Plan
 
(CHMP) in
 
2012.
 
This plan
 
was subsequently repealed
and
 
replaced
 
by
 
the
 
2017
 
CHMP
 
with
 
the
 
statutory
 
Aboriginal
 
parties
 
for
 
the
 
area
 
to
 
allow
 
access
 
for
 
mining
activities. A Services Agreement signed in December 2017 details the fee schedule for services
 
such as cultural
heritage survey and mitigation
 
prior to mining and
 
exploration activities by
 
Curragh.
 
These agreements comply
with
 
the
 
legislation
 
and
 
are
 
within
 
industry
 
standards.
 
All
 
cultural
 
heritage
 
sites
 
are
 
protected
 
and
 
subject
 
to
mitigation, however there are currently no identified sites
 
of significant cultural heritage value.
 
With
 
reference
 
to
 
native
 
title,
 
the
 
Queensland
 
Government
 
coordinates
 
the
 
application
 
process
 
for
 
Resource
authorities and
 
advise on land
 
that may be
 
subject to
 
native title.
 
To
 
date none
 
of the Curragh
 
Mining Leases,
other than ML80123, require native title processes for its grant.
 
However, most areas in central Queensland are
subject to
 
an undetermined
 
Native Title
 
Claim and
 
the determination
 
of native title
 
may affect
 
existing or
 
future
mining activities at Curragh.
17.5
 
Mine closure plans and associated costs
Queensland legislation now requires that all
 
large mines develop a Progressive Rehabilitation
 
and Closure Plan
(PRCP). The main purposes of the
 
PRCP are to plan for how and where
 
mining activities will be carried out in
 
a
way that maximises progressive
 
rehabilitation and to detail the
 
condition to which the land
 
must be rehabilitated
prior to relinquishment.
 
The Curragh Project PRCP is in the process of being developed for submission on 21 October 2022. The PRCP
will
 
include
 
post-mining
 
land
 
uses,
 
rehabilitation
 
methodologies,
 
community
 
consultation
 
requirements,
supporting
 
technical
 
studies
 
and
 
a
 
schedule
 
outlining
 
when
 
rehabilitation
 
will
 
occur.
 
The
 
Curragh
 
Project
 
is
approved to have residual voids in the post-mining landform.
 
Estimated
 
costs
 
for
 
mine
 
closure,
 
including
 
removal
 
of
 
infrastructure,
 
contaminated
 
land
 
investigations
 
and
remediation, reshaping and
 
rehabilitation works, monitoring
 
and maintenance and
 
a 10%
 
contingency, have been
undertaken using
 
a government
 
security bond
 
calculator.
 
This cost
 
is updated
 
at least
 
every five
 
years and
 
as
required by
 
legislation; an
 
appropriate security
 
bond has
 
been lodged with
 
the Queensland
 
State Government.
Curragh has
 
recognised a provision
 
for Asset Retirement
 
Obligation (ARO) of
 
$70.2million based on
 
disturbances
to date as disclosed in the 10K for the year ending 31
 
December 2021.
17.6
 
Qualified Person ’s Opinion
It is the Qualified Person’s opinion (Paul Wood) that environmental matters
 
are effectively controlled at Curragh,
without major incidents that pose extreme risks to the
 
project areas.
17.7
 
Commitment to local hiring
Curragh has
 
a long association
 
with the Blackwater
 
community. Since the mine opened
 
in 1983,
 
many employees
and their families have
 
lived in Blackwater,
 
and through this
 
connection Curragh has
 
been a major supporter
 
of
the Blackwater community.
Curragh’s
 
community
 
engagement
 
includes
 
providing
 
support
 
across
 
community
 
organisations,
 
health
 
care,
education, sport,
 
culture, indigenous communities
 
and local
 
tourism. Curragh is
 
proud to
 
support the
 
development
of a strong, healthy and vibrant Blackwater community.
Respecting
 
and
 
preserving
 
Indigenous
 
cultural
 
heritage
 
is
 
important
 
to
 
Curragh.
 
Curragh
 
holds
 
regular
 
co-
ordination meetings
 
with representatives
 
of the
 
local Indigenous
 
communities and
 
educates its
 
employees and
contractors on the importance and significance of Aboriginal
 
heritage and culture.
We have
 
long standing
 
relationships with
 
the communities
 
surrounding our
 
mines. Many
 
of our
 
employees live
near our
 
mines and
 
benefit from
 
our social
 
partnerships and
 
investments 57%
 
of our
 
site-based employees
 
at
Curragh have a home in nearby locations. This is relatively
 
unchanged from 2019.
 
 
ex961p63i3.jpg ex961p63i2.jpg ex961p63i1.jpg ex961p63i0.jpg
 
Page 63 of 76
18
Capital and Operating Costs
18.1
 
Capital Cost Estimate
The
 
production
 
sequence
 
selected
 
for
 
a
 
property
 
must
 
consider
 
the
 
proximity
 
of
 
each
 
reserve
 
area
 
to
 
coal
preparation
 
plants,
 
and
 
railroad
 
loading
 
points,
 
along
 
with
 
suitability
 
of
 
production
 
equipment
 
to
 
coal
 
seam
conditions.
 
Existing in-place infrastructure was evaluated, and any future needs were planned to a
 
level suitable
for economic reserves production including assessment of sustaining and development capex to allow entry into
new open pit mining areas.
A summary of the estimated capital for the Property is provided
 
in
below.
 
Figure 18-1: CAPEX US$ million
18.2
 
Operating Cost Estimate
Curragh’s costs estimates are based on application of existing contract rates for both upstream and downstream
costs aligned to
 
waste removed and
 
production rates. Unit
 
rates by activities
 
are assessed in
 
detail for site
 
budget
preparations and long term averages adjusted for inflation are
 
applied to future periods for the life of mine.
Operating costs include calculation of Queensland state royalties applied to
 
sales revenue and calculated within
mandated tiers. A summary of costs per tonne is provided
 
in
Figure 18-2
 
 
ex961p64i0.jpg
 
Page 64 of 76
19
Economic Analysis
19.1
 
Assumptions, Parameters and Methods
The Mine plan,
 
productivity expectations and cost
 
estimates generally reflect historical
 
performance by Coronado
and efforts
 
have been
 
made to
 
adjust plans
 
and costs
 
to reflect
 
future conditions
 
and comply
 
with contractual
obligations.
The financial model, prepared for this
 
TRS, was developed to test the
 
economic viability of the coal
 
reserve area.
 
The results of
 
this financial model
 
are not intended
 
to represent a
 
bankable feasibility study, required for financing
of any current or future mining operations,
 
but are intended to prove the economic
 
viability of the estimated coal
reserves.
 
On an unlevered basis, the
 
NPV of the project
 
cash flows after taxes was estimated
 
for the purpose of classifying
coal reserves.
 
The project
 
cash flows,
 
excluding debt
 
service, are
 
calculated by
 
subtracting direct
 
and indirect
operating expenses
 
and capital
 
expenditures from
 
revenue.
 
Revenue is
 
derived
 
from long
 
term forward
 
price
estimates observed at December 2021 and January 2022.
 
Both upstream and downstream costs are calculated
based on site knowledge of costs profiles and contractor obligations. Net cash flows incorporate applicable state
and federal taxes plus progressive reclamation obligations to the end of mine
 
closure. All cash flows are nominal
incorporating inflation of 1.8% and 2.2% in FY22 and
 
FY23 and 2.4% thereafter.
All figures are reported in USD
 
millions unless otherwise stated
 
and volume related data is
 
reported on a metric
tonne basis. The resulting NPV valuations use a 10% Weighted
 
Average Cost of Capital (WACC).
The projection
 
model
 
also
 
includes
 
consolidated
 
income
 
tax
 
calculations
 
at
 
the
 
Coronado
 
level,
 
incorporating
statutory depletion calculations, as
 
well as state income
 
taxes, and a federal
 
tax rate of 30%.
 
To
 
the extent the
mine generates net operating losses for
 
tax purposes, the losses are
 
carried over to offset future taxable income.
 
The terms “cash flows” and “project cash flows” used
 
in this report refer to after tax cash flows.
Annual
 
cash
 
flows
 
based
 
throughout
 
mine
 
life
 
to final
 
reclamation
 
and
 
make
 
good
 
on
 
assumptions
 
applied
 
is
provided in
Figure 19-1: Project Post Tax Net Cash Flow Summary (Millions)
19.2
 
Sensitivity
Base case
 
NPV of
 
$1.5 billion
 
is based
 
on life
 
of mine
 
average exchange
 
rate of
 
0.67, derived
 
from exchange
rate forward
 
curves during January
 
2022 and index
 
price estimates observed
 
during December 2021
 
and January
2022.
Outcomes of index price estimates applied to Curragh’s product mix and coal specification for both
 
metallurgical
and thermal coal are shown in
, showing average realised price per sales tonne.
 
 
 
 
 
 
 
 
 
 
 
ex961p65i0.jpg
 
Page 65 of 76
Figure 19-2
Sensitivity of
 
the NPV
 
results to
 
changes in
 
the key
 
drivers
 
is presented
 
in
.
 
The sensitivity
 
study
shows
 
the
 
NPV
 
at
 
the
 
10%
 
discount
 
rate
 
when
 
Base
 
Case
 
sales
 
prices
 
and
 
exchange
 
rates
 
increased
 
and
decreased in increments of 5%.
Table 19-1: Sensitivity of NPV (USD billions)
Price/FX
-5%FX
Base
+5% FX
+5% Price
$2.0
$1.7
$1.4
Base
$1.8
$1.5
$1.2
-5% Price
$1.5
$1.2
$0.9
As shown, NPV is quite sensitive to change in sales price
 
and exchange rate.
19.3
 
Results
 
The results of this financial model are not intended to
 
represent a bankable feasibility study,
 
as may be required
for financing
 
of any
 
current
 
or future
 
mining
 
operations
 
contemplated
 
but
 
are intended
 
to
 
prove the
 
economic
viability of the estimated coal reserves.
Cash flows are sufficient to support identified economic
 
reserves.
 
 
 
 
Page 66 of 76
20
Adjacent properties
 
20.1
 
Information Used
No Proprietary information associated with neighbouring properties
 
was used as part of this study.
 
 
 
 
Page 67 of 76
21
Other relevant data and information
 
This document
 
applies solely
 
to the
 
Curragh mining
 
operations and
 
no other
 
relevant data
 
or information
 
were
contemplated in its findings.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 68 of 76
Risk Level
Extreme Risk (1 to
 
8)
High Risk (9
 
to 15)
Moderate
 
(16 to
 
20)
Low Risk (21 to
 
25)
22
Interpretation and conclusions
 
22.1
 
Conclusion
Upon completion of these studies and analyses of the Curragh project, the authors have reached the conclusion
that
 
the
 
coal
 
resource
 
and
 
reserve
 
estimates
 
and
 
related
 
findings
 
presented
 
in
 
its
 
document
 
are
 
reasonably
accurate
 
and
 
representative
 
of
 
the
 
property
 
conditions.
 
The
 
data
 
has
 
been
 
interpreted
 
according
 
to
 
industry
standards, geostatistics
 
was used
 
to estimate
 
resource tonnes
 
and qualities
 
away from
 
drill holes
 
according to
the level of confidence as drill hole
 
spacing outlined in
. Reserves were derived from the
 
defined coal
resource
 
considering
 
relevant
 
mining,
 
processing,
 
infrastructure,
 
economic
 
(including
 
estimates
 
of
 
capital,
revenue, and cost), marketing, legal, environmental, socio
 
-economic and regulatory factors.
22.2
 
Risk Factors
A risk matrix has been constructed to present the risk levels for all the risk factors identified and quantified in the
risk assessment process.
 
The purpose
 
of the
 
characterization of
 
the project
 
risk components
 
is to
 
inform the
 
project stakeholders
 
of key
aspects of the
 
Curragh project
 
that can be
 
impacted by
 
events whose consequences
 
can affect
 
the success
 
of
the venture.
 
The significance of an impacted
 
aspect of the operation
 
is directly related to both the
 
probability of
occurrence
 
and
 
the
 
severity
 
of
 
the
 
consequences.
 
Risk
 
can
 
be
 
ranked
 
numerically,
 
derived
 
from
 
the
 
values
assigned to probability and consequence ranging from
 
very low risk to very high risk.
 
The
 
probability
 
and
 
consequence
 
parameters
 
are
 
subjective
 
categorical
 
estimates
 
made
 
by
 
practiced
 
mine
engineers and managers.
 
Consequence estimates are assigned
 
numerical integer values from
 
1 to 5 for which
the value
 
1 represents
 
the highest
 
consequence, and
 
the value
 
5 represents
 
the lowest.
 
Probability estimates
are assigned
 
alphabetical
 
values from
 
A to
 
E with
 
A representing
 
the highest
 
probability
 
of occurrence
 
and
 
E
representing
 
the
 
lowest
 
probability.
 
The
 
combination
 
of
 
Consequence
 
and
 
Probability
 
rankings
 
are
 
used
 
to
assign the Risk Level from 1 to 25 and are classified from
 
Extreme (very high) to Low risk.
 
Table 22-1: Risk Level Table
22.2.1
 
Governing Assumptions
The
 
listing
 
of
 
the
 
aspects
 
is
 
not
 
presumed
 
to
 
be
 
exhaustive.
 
Instead
 
that
 
listing
 
is
 
presented
 
based
 
on
 
the
experiences of the contributors to the TRS.
 
The
 
probability
 
and
 
consequence
 
ratings
 
are
 
subjectively
 
assigned,
 
and
 
it
 
is
 
assumed
 
that
 
this
 
subjectivity
reasonably reflects the condition of the active and projected
 
mine operations.
The Control
 
Measures
 
shown in
 
the matrices
 
presented in
 
this chapter
 
are not
 
exhaustive.
 
They represent
 
a
condensed collection of
 
activities that the
 
author of the
 
risk assessment section
 
has observed to
 
be effective
 
in
coal mining scenarios.
 
Mitigation Measures listed
 
for each risk
 
factor of the
 
operation are not
 
exhaustive.
 
The measures listed,
 
however,
have been observed by the author to be effective.
 
The monetary
 
values used
 
in ranking
 
the consequences
 
are generally
 
accepted
 
quantities for
 
the coal
 
mining
industry.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 69 of 76
Risk Rank
Risk Control
 
Measures
Control
 
Approvals
Extreme Risk (1 to
 
8)
Develop
 
Critical Risk Management Plan –include focus on provision
 
of multiple
 
hard defences,
 
where
practicable, in conjunction with
 
recovery/ contingency
 
systems,
 
appropriate competency.
 
Develop
 
risk
avoidance, reduction
 
and transfer mechanisms.
Site Senior
 
Executive
 
/
Operations Managers /
Project Managers
High Risk (9
 
to 15)
Develop
 
least one hard defence
 
and recovery/ contingency systems
 
where practicable,
 
in conjunction
with appropriate competency.
 
Develop
 
risk avoidance, reduction
 
and transfer mechanisms.
Project Managers /
Superintendents
Moderate
 
(16 to
 
20)
Review
 
effectiveness
 
of current project controls. Develop
 
and define
 
risk retention
 
mechanisms.
Superintendents
 
/
Supervisors
Low Risk (21 to
 
25)
Review
 
effectiveness
 
of current controls. Develop
 
and define
 
risk retention
 
mechanisms.
All personnel
 
involved
in project
Cat.
Damage / Loss
Cat.
Likelihood
1
>$50m damages
 
/ large
reorganisation
 
of project,
 
Major
Environmental
 
Damage
A
Common
 
or frequent
 
-
once
 
per
 
month.
2
$10m-$50m damages
 
/ project
contingency
 
plan
 
required
serious environmental damage.
B
Likely
 
- Is
 
known
 
to
happen
 
once
 
per
 
year.
3
$1k-$10m
 
damage
 
/ production
disruptions environmental
damage
C
Possible
 
- Could
 
occur
once
 
per
 
year.
4
$100-$1m damage
 
/ 1–2 shifts
production
 
loss,
 
minor
environmental damage
D
Unlikely
 
- Could
 
occur
once
 
per
 
10 years.
5
< $100K damage
 
/ minimal
production
 
loss,
 
No
environmental damage
E
May occur
 
under
exceptional cases once
per
 
lifetime
 
> 30 years.
Consequence
Probability
22.2.2
 
Limitations
The risk
 
assessment
 
proposed
 
in this
 
report
 
is subject
 
to the
 
limitations
 
of the
 
information currently
 
collected,
tested, and interpreted at the time of the writing of the report.
22.2.3
 
Methodology
The
 
numerical
 
quantities
 
(i.e.,
 
risk
 
levels)
 
attributable
 
to
 
defined
 
risks
 
are
 
derived
 
by
 
the
 
product
 
of
 
values
assigned to probability and consequence ranging from
 
very low risk to very high risk.
The Consequence (C) and Probability (P) parameters used in scoring are subjective categorical estimates made
by practiced mine
 
engineers and managers.
 
Both C and
 
P are assigned
 
numerical or alphabetical
 
values ranging
from 1 to 5 or
 
A to E.
 
Both values are assigned
 
in descending rank for
 
which the value 5
 
(or E) represents the
least
 
consequence
 
(lowest
 
probability),
 
and
 
the
 
value
 
1
 
(or
 
A)
 
represents
 
the
 
greatest
 
consequence
 
(highest
probability).
 
The combination of C and P
 
are used to assign a
 
Risk Level value and are thereafter classified from
Extreme to Low.
Table 22-2:
 
Risk Rankings and Control Measures
22.2.4
 
Development of the Risk Matrix
Risks have been identified for the technical, operational, and administrative subjects addressed in the TRS.
 
The
risk matrix and risk assessment process are
 
modelled according to the Australian and New
 
Zealand Standard on
Risk Management (AS/NZS 4360).
 
22.2.4.1
 
Consequence and Probability Level Table
Table 22-3:
 
Consequence and Probability Level Table ($AUD)
The
 
highest
 
rated
 
consequence
 
is
 
assigned
 
the
 
value
 
of
 
1
 
and
 
is
 
considered
 
critical.
 
Damages
 
may
 
exceed
$50m AUD
 
and may
 
require major
 
reorganisation of
 
the project.
 
Increasing values
 
are assigned
 
to each
 
lower
category of consequence,
 
culminating with the
 
value of 5
 
assigned to insignificant
 
consequences, the parameters
of which include no environmental damage, minimal loss
 
of production and cost of less than $100k AUD.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 70 of 76
1
E1
E2
E4
E7
H11
2
E3
E5
E8
H12
M16
3
E6
H9
H13
M17
M20
4
H10
H14
M18
L21
L23
5
H15
M19
L22
L24
L25
Probability
Consequence
D
E
A
B
C
The
 
highest
 
rated
 
probability
 
of
 
occurrence
 
is
 
assigned
 
the
 
value
 
of
 
‘A’
 
and
 
described
 
as
 
common,
 
with
 
a
likelihood of occurring once per month.
 
Increasing alphabetical values are assigned to
 
each lower probability of
occurrence, culminating with the value of ‘E’ assigned to incidents
 
considered to very unlikely to occur.
22.2.4.2
 
Composite Risk Matrix and Color-Code Convention
The risk
 
level, assigned
 
from the
 
probability
 
of occurrence
 
and consequence,
 
ranges in
 
value
 
from 1
 
(highest
possible risk)
 
to 25
 
(lowest risk
 
level).
 
The values
 
are color-coded
 
to facilitate
 
identification of
 
the highest
 
risk
aspects.
Table 22-4:
 
Risk Matrix
Extreme risks may be considered unacceptable and require corrective action.
 
Risk reduction measures must be
applied to reduce Extreme risks to a tolerable level.
22.2.5
 
Risk Factors
A high-level approach
 
is utilized to characterize
 
risk factors that
 
are generally similar
 
across a number
 
of active
and proposed mining
 
operations. Risk factors
 
that are unique
 
to a
 
specific operation or
 
are particularly noteworthy
are addressed individually.
22.2.5.1
 
Mining (Planning and Production)
Accurate mine planning is critical to the
 
success of any mining operation.
 
A realistic understanding of equipment
and labour
 
capabilities
 
and
 
needs allow
 
for
 
production
 
deadlines
 
to be
 
achieved
 
at forecast
 
cost.
 
Equipment
downtime is a
 
major factor in
 
lost production and can
 
be minimised with a
 
robust maintenance program that
 
helps
prevent unexpected breakdowns and unforeseen costs.
 
Skilled labour is crucial to the implantation
 
of the maintenance program and mine
 
production in general.
 
Skilled
labour
 
must
 
be
 
recruited
 
and
 
trained
 
to
 
meet
 
the
 
production
 
needs
 
of
 
the
 
mine.
 
Labour
 
contracts
 
must
 
be
negotiated early to avoid disruptions to the production schedule.
22.2.5.2
 
Geological
Coal
 
mining
 
is accompanied
 
by
 
risk
 
that,
 
despite
 
exploration
 
efforts,
 
mining
 
areas
 
will
 
be
 
encountered
 
where
geological
 
conditions
 
render
 
extraction
 
of
 
the
 
Resource
 
to
 
be
 
uneconomic,
 
or
 
that
 
coal
 
quality
 
characteristics
disqualify the product for sale into target markets.
 
 
Page 71 of 76
Unexpected changes in geologic conditions can be
 
minimized by maintaining an exploration and drilling program
well in advance
 
of mining.
 
This will allow
 
for production
 
forecasts to
 
be as accurate
 
as possible
 
while allowing
for adjustments to the mine plan to minimize the effects
 
of any adverse conditions that are found.
22.2.5.3
 
CPP (Prep Plant)
Raw coal
 
processing facilities
 
are key
 
to creating
 
a saleable
 
product for
 
the consumer.
 
Along with
 
operational
maintenance and downtime
 
issues, operational efficiency must
 
continually be evaluated
 
to ensure
 
that production
targets can be met in the face
 
of changing mining conditions.
 
Process and equipment changes may
 
be needed
to maintain yield in the future.
 
Capital expenditures and planning are generally able to overcome
 
these issues.
22.2.5.4
 
Environmental
Environmental permit requirements
 
are subject to
 
modification and
 
such changes could
 
have a material
 
impact
on
 
the
 
capability
 
of
 
the
 
operator
 
to
 
meet
 
modified
 
standards
 
or
 
to
 
receive
 
new
 
permits
 
and
 
modifications
 
to
existing permits. Permit protests may result in delays or
 
denials to permit applications.
Environmental standards
 
and permit
 
requirements
 
continue to
 
evolve, mining
 
operators and
 
regulatory
 
bodies
have been able to adapt successfully to evolving environmental
 
requirements.
22.2.5.5
 
Mining Capital
Aging equipment
 
and changing
 
conditions drive
 
the need
 
for capital
 
investment.
 
Underestimating the
 
need for
equipment or the cost can lead to unforeseen production
 
and budgetary changes.
 
Assessment of capital needs
must be ongoing to ensure that operational needs are
 
met and budgeted for appropriately.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 72 of 76
Ta
ble 22-5:
 
Risk Assessment
IDENTIFICATION
C
P
Score
RISK TREATMENT
Discipline
Risk Factors
 
Consequences
Risk treatment strategy
Mining
Production
forecast
cannot
 
be
maintained
Delays or higher costs
 
1
A
E1
●
 
Optimise the mine
 
plan to reduce
the
 
risk.
 
Ensure
 
enough
equipment
 
is
 
available
 
to
 
meet
budget targets.
●
 
Contractors must be on board to
ensure flexibility in the workforce
Dragline
efficiencies
not improved
Delays
 
and
 
higher
 
costs
 
for
removal
 
of
 
overburden
 
by
contractor
 
to
 
maintain
 
budget
production
2
A
E3
●
 
Ongoing
 
planning
 
required
 
to
optimise DL
 
strike and
 
reduce DL
standby
Current
 
coal
inventory
requires
improving
Increased
 
cost
 
of
 
overburden
removal
1
A
E1
●
 
Develop a mine plan
 
to optimise
pit
 
inventories
 
and
 
overburden
cost
Flooding
 
due
to
 
heavy
 
wet
season
 
or
creating
 
very
difficult
working
conditions
Loss
 
of
 
production;
 
Silting
 
of
natural water courses
Correct
 
disposal
 
of
 
mine
 
water
compromised
1
B
E2
●
 
Ensure
 
pumping
 
details
 
are
planned with contingency
●
 
Suitable
 
allowance
 
in
 
the
scheduling.
●
 
Ensure
 
mine
 
planning
 
suitably
addresses the consequences.
Maintenance
of equipment
Reduce production
 
and increase
in cost
2
B
E5
●
 
Develop
 
and
 
maintain
 
effective
maintenance
 
schedules
 
and
plans
Contract
Mining
Lack
 
of
 
skilled
 
workforce
 
to
maintain
 
enough
 
equipment
 
for
the mine plan
 
2
B
E5
●
 
Ensure contractors
 
are involved
in
 
the
 
mine
 
planning
 
schedule
and are aware of mine plan.
 
●
 
Continue
 
recruitment
 
and
incentivise
 
contractors
 
to
minimise labour turnover
Operating
costs
Increased operating costs
3
C
H13
●
 
Maintain
 
focus
 
on
 
cost
 
control
and contractor management
Multiple
contracts
 
with
different
renewal dates
Lack of continuity in production
1
C
E4
●
 
Procurement to manage
 
contract
processes
Geotechnical
risks
 
on
highwall/low
wall
Loss
 
of
 
production
 
potentially
safety hazard
3
B
H9
●
 
Maintain
 
current
 
geotechnical
studies
 
and
 
maintenance
 
of
present
 
procedures
 
to
 
ensure
current
 
good
 
practices
 
are
maintained
Fatality
 
or
other
significant
safety incident
Potential
 
mine
 
interruption
 
while
inspector conducts investigation
1
E
H11
●
 
Continue to adhere to the SHMS
and operational discipline
Geology/Geotechnical
Thrust
Faulting
Difficult drill and blast.
Difficult mining and wall stability.
Orientation of strips/joints.
Quality control.
Slower production rates
3
C
H13
●
 
Plan mine orientation
 
to consider
faulting.
●
 
Plan mine orientation
 
to consider
joints.
●
 
Continue
 
geotech
 
drilling
 
and
modelling.
●
 
In-fill drilling ahead of mining.
●
 
Incorporation
 
of
 
highwall
structural mapping into
 
the short-
term geological model.
Predicted
primary
product
 
yields
not achieved
Affects
 
forecast
 
coking
 
coal
product
 
tonnes
 
and
 
sales
revenue.
 
3
C
H13
●
 
In-fill
 
large
 
diameter
 
(200
 
mm)
coal quality core drilling
 
ahead of
mining.
Miscorrelated
seam/ply
intersections
in
 
the
structural
model.
Affects
 
the
 
scheduled
 
coal
 
and
waste, and the ROM strip ratio.
3
C
H13
●
 
Detailed
 
analysis
 
of
 
down
 
hole
geophysics
 
and
 
mapped
exposures.
●
 
In-fill drilling if necessary.
●
 
Regular
 
reviews
 
of
 
seam
correlation
 
by
 
experienced
geologists
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 73 of 76
IDENTIFICATION
C
P
Score
RISK TREATMENT
Discipline
Risk Factors
 
Consequences
Risk treatment strategy
CHPP
Structural
Integrity
Increased costs and potential
 
for
production loss
2
C
E8
●
 
Continue
 
to
 
maintain
 
the
structural
 
maintenance
programme
Yield loss
Failure
 
to
 
achieve
 
forecast
production targets
2
C
E8
●
 
Ongoing
 
monitoring
 
of
 
plant
operations to improve recoveries
Environmental
No completion
criteria
assessment
Success of
 
rehabilitation against
completion
 
criteria
 
not
undertaken,
 
which
 
means
progressive
 
rehabilitation
previously
 
undertaken
 
may
 
not
be to standard
4
C
M18
●
 
Conduct
 
an
 
assessment
 
of
rehabilitated
 
areas
 
to
 
ensure
completion criteria
 
is being
 
met;
rectify
 
and
 
re-cost
 
financial
assurance where necessary.
Mine
 
closure
costs
Additional
 
mine
 
closure
provisions required.
 
2
B
E5
●
 
Mine
 
closure
 
provisioning
inadequate.
 
●
 
Ongoing review
 
of mine
 
closure
costs and provisioning.
Environmental
harm
Company
 
comes
 
under
regulatory
 
scrutiny
 
for
environmental
 
damage,
 
fines,
reputation, clean-up costs.
 
3
C
H13
●
 
Annual
 
dams
 
inspections
 
by
registered
 
professionals,
 
env
management
 
systems,
procedures, training, reporting.
 
Operating
without
approvals
 
and
non-
compliance
Delays,
 
stop
 
work,
 
fines,
 
for
operating without an ML or on an
MLA,
 
without
 
an
 
approved
 
Plan
of
 
Operations
 
or
 
outside
 
of
licence conditioning and footprint
(such
 
as
 
land
 
clearing,
 
spoil
dumping,
 
cultural
 
heritage
impacts).
3
E
M20
●
 
Corporate
 
governance
structures,
 
clearing
 
permits,
internal
 
site
 
approvals,
 
job
descriptions
 
and
 
training
Environmental
complaints
Stop
 
work,
 
fines,
 
public
perception
 
(from
 
dust,
 
blasting
impacts)
5
B
M19
●
 
Complaints
 
register
 
monitoring
and
 
mitigation
 
systems,
procedures and training
Mining Capital
Low estimate
Unrealistic project assessment
 
1
C
E4
●
 
Ongoing
 
assessment
 
of
 
current
assets
 
and
 
budget
 
capital
requirements
 
 
 
 
Page 74 of 76
23
Recommendations
 
Coronado
 
is
 
continuing
 
to
 
work
 
both
 
internally
 
and
 
with
 
outside
 
assistance
 
to
 
continue
 
to
 
further
 
define
 
their
Resource
 
Base
 
and
 
to
 
Optimize
 
the
 
LOM
 
Plan.
 
Exploration
 
drilling
 
has
 
been
 
budgeted
 
to
 
be
 
carried
 
into
 
the
future to upgrade resource categories
 
at the cost of
 
millions of dollars. Each
 
year the results of
 
this work are used
to create
 
a geological
 
model (at
 
the cost
 
of tens
 
of thousands
 
of dollars).
 
This is
 
then used
 
as the
 
basis for
 
pit
optimisation and cutting new solids used in the life of
 
mine planning process.
A planning calendar
 
is kept to
 
track the tasks
 
each year and
 
forms the basis
 
of pulling the
 
annual budget together.
 
 
 
 
 
Page 75 of 76
24
References
 
Various
 
reports including the
 
2019 SEC report,
 
Coronado prospectus,
 
2021 Later development
 
plan, SEC TRS
guidelines and sample TRS reports. These are
1.
 
Curragh SEC
 
Report (2019-04-02)
 
Metric with
 
maps footnote
 
added to
 
Table
 
1.3 and
 
11.1
 
bc 342019
jsd_sk
2.
 
Coronado-Global-Resources-Inc.-Prospectus-Compressed (1)
3.
 
2021 Later Development Plan Curragh_draft_Rev6 adjustments
 
for Ardent's comments
4.
 
SEC TRS guidelines from page 388 33-10570
5.
 
Final Buchanan SEC Metric Tonnes
 
(M62181 2021-02-12) 4Client
25
Reliance on information provided by the registrant
 
For
 
the
 
purpose
 
of
 
this
 
report
 
the
 
Geological
 
data
 
provided
 
by
 
Coronado
 
was
 
subjected
 
to
 
verification
 
of
 
its
integrity and completeness. Barry Lay
 
the resource Qualified Person
 
provided some but not
 
all of the information
in Chapters 1, 6, 7 and 11, Paul Wood the reserve Qualified Person
 
provided some but not all of the information
in Chapters 1 and 12.
 
Paul Wood also sourced
 
the bulk of the
 
information in Chapters 2,
 
3, 4, 5, 7, 8, 9,
 
10, 13,
14, 15, 17, 20, 21, 22, 23, 24 and 25 from the above mentioned
 
references and external consultants.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 76 of 76
26
Glossary of Abbreviations and Definitions
 
Abbreviation
Definition
AUD
Australian Dollar
AUD:USD
Australian Dollar to US Dollar currency conversion rate
EBITDA
Earnings Before Interest Tax
 
Depreciation & Amortization
Kt
Kilo tonnes; Units in thousands
LOM
Life Of Mine
Mbcm
Million bank cubic meters
MDL
Mineral Development Licence
Metallurgical Coal
Coal used in the steel making process
ML
Mining Lease
MMt
Million Metric Tonne
Mt
Million Tonnes
NPV
Net present value
P&L
Profit and loss
PCI
Pulverised Coal Injection
Prdt
Product Tonne
ROM
Run Of Mine, Coal mined
t
Metric tonnes
USD
US Dollar
WACC
Weighted average cost of capital as a percentage
 
ex962p1i0.jpg
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300
 
as of December
31, 2021
Central Appalachian Coal Basin
Virginia, USA
February 2022
Prepared for:
Coronado Global Resources Inc.
 
100 Bill Baker Way
 
Beckley, West
 
Virginia 25801
Prepared by:
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
582 Industrial Park Road
Bluefield, Virginia
 
24605
www.mma1.com
 
 
ex962p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
Statement of Use and Preparation
This
 
Technical
 
Report
 
Summary
 
(
TRS
)
 
was
 
prepared
 
by
Marshall
 
Miller
 
&
 
Associates,
Inc.
 
(
MM&A
)
 
for
 
the
 
sole
 
use
 
of
Coronado
 
Global
 
Resources
 
Inc.
 
(
Coronado
)
and
 
its
affiliated
 
and
 
subsidiary
 
companies
 
and
 
advisors.
 
Copies
 
or
 
references
 
to
 
information
 
in
this report may not be used without the written permission of Coronado.
This
 
report
 
provides
 
a
 
statement
 
of
 
coal
 
resources
 
and
 
coal
 
reserves
 
for
 
Coronado,
 
as
defined
 
under
 
the
Australasian
 
Code
 
for
 
Reporting
 
of
 
Exploration
 
Results,
 
Mineral
Resources and Ore Reserves
(
JORC Code
) as well as under
 
Subpart 1300 of Regulation
S-K
 
(Regulation
 
S-K
 
1300)
 
promulgated
 
by
the
United
 
States
 
Securities
 
and
 
Exchange
Commission
 
(
SEC
)
.
 
Subject
 
to
 
the
 
comments
 
below,
 
this
 
report
 
was
 
also
 
prepared
 
in
accordance with
 
the
Australasian Code
 
for Public
 
Reporting of
 
Technical Assessments
and Valuations of Mineral Assets
(
VALMIN Code
).
 
The statement is
 
based on information
 
provided by Coronado and
 
reviewed by Michael
 
G.
McClure, CPG; and Justin S. Douthat, PE, MBA.
As
 
noted
 
above,
 
this
 
report
 
is
 
a
 
“Public
 
Report”
 
for
 
the
 
purposes
 
of
 
the
 
VALMIN
 
Code.
 
However, in accordance with
 
paragraph 12.1
 
of the VALMIN Code,
 
it is
 
noted that
 
this report
is
 
not
 
a
 
“Valuation
 
of
 
Mineral
 
Assets”
 
and
 
it
 
also
 
does
 
not
 
comply
 
with
 
the
 
following
requirements that apply to “Technical
 
Assessments” (as defined in the VALMIN Code):
This report does not include a determination of the status of tenure (as required by
paragraph 7.2 of the VALMIN Code) on the basis that tenure was separately reviewed
by Coronado’s legal advisors.
This report does
 
not include separate
 
commentary on the
 
reasonableness and quality
 
of the
Resources
 
and
 
Reserves estimates
 
and
 
the basis
 
on
 
which
 
they have
 
been
 
reported (as
required
 
by
 
paragraph
 
7.3
 
of
 
the
 
VALMIN
 
Code)
.
 
MM&A
 
did
 
not
 
consider
 
that
 
this
 
was
appropriate
 
in
 
circumstances
 
where
 
MM&A
 
was
 
engaged
 
for
 
the
 
specific
 
purpose
 
of
preparing those estimates and the Resource estimates were prepared
 
by Michael McClure
and the Reserve
 
estimates were prepared
 
by Justin Douthat,
 
both of whom
 
are authors of
this report.
 
However,
 
MM&A notes
 
that, in
 
accordance with
 
its usual
 
practice, a
 
separate
team of
 
MM&A employees
 
undertook a
 
peer review
 
of this
 
report and
 
confirmed that
 
both
the
 
process
 
followed
 
by
 
the
 
authors
 
of
 
this
 
report
 
and
 
the
 
estimates
 
prepared
 
were
reasonable and comply with the requirements of the JORC Code.
 
Justin Douthat is a licensed
 
Professional Engineers and Registered Member
 
of the
Society
of
 
Mining
 
Engineers
 
(
SME
)
,
 
Golden,
 
Colorado,
 
USA.
 
Michael
 
McClure
 
is
 
a
 
Registered
Member of
 
the
American Institute
 
of Professional
 
Geologists
(
AIPG
)
.
 
SME and
 
AIPG
are
Recognized
 
Professional
 
Organizations
 
(
RPOs
)
.
 
Both
 
are
 
full-time
 
employees
 
of
Marshall Miller & Associates, Inc. and recognized as a
Qualified Persons
(
QPs
).
The information
 
in this
 
TRS related
 
to coal
 
resources and
 
reserves is
 
based on,
 
and fairly
represents, information
 
compiled by the
 
QPs.
 
At the time
 
of reporting, MM&A’s
 
QPs have
sufficient
 
experience
 
relevant
 
to
 
the
 
style
 
of
 
mineralization
 
and
 
type
 
of
 
deposit
 
under
 
 
ex962p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
consideration and
 
to the
 
activity they are
 
undertaking to qualify
 
as a QP
 
as defined by
 
the
SEC and the
 
JORC Code.
 
Each QP consents
 
to the inclusion
 
in this report
 
of the matters
based on their information in the form and context in which it appears.
Marshall Miller & Associates, Inc. (
MM&A
)
 
hereby consents to the use of the information
contained in
 
this report
 
dated December
 
31, 2021,
 
relating to
 
estimates of
 
coal resources
and coal reserves controlled by Coronado.
 
 
 
 
ex962p2i0.jpg
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
This report was prepared by:
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
/s/ Michael G. McClure
February 18, 2022
Michael G. McClure, CPG
Principal Geologist
Direct Line: +1 304 809 1611
Email:
 
mike.mcclure@mma1.com
 
Date of Signature
/s/ Justin S. Douthat
February 18, 2022
Justin S. Douthat, PE, MBA
Executive Vice President
Direct Line: +1 304 809 0597
Email:
 
justin.douthat@mma1.com
Date of Signature
 
 
ex962p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
Table of
 
Contents
1
Executive Summary
1
1.1
Property Description
1
1.2
Ownership
2
1.3
Geology
2
1.4
Exploration Status
3
1.5
Operations and Development
3
1.6
Mineral Resource
3
1.7
Mineral Reserve
4
1.8
Capital Summary
5
1.9
Operating Costs
5
1.1
Economic Evaluation
6
1.10.1
Discounted Cash Flow Analysis
9
1.10.2
Sensitivity Analysis
9
1.11
Permitting
10
1.12
Conclusion and Recommendations
10
2
Introduction
10
2.1
Registrant and Terms
 
of Reference
10
2.2
Information Sources
11
2.3
Personal Inspections
11
3
Property Description
11
3.1
Location
11
3.2
Titles, Claims or Leases
12
3.3
Mineral Rights
12
3.4
Encumbrances
13
3.5
Other Risks
13
4
Accessibility, Climate, Local Resources, Infrastructure and Physiography
13
4.1
Topography,
 
Elevation, and Vegetation
13
4.2
Access and Transport
13
4.3
Proximity to Population Centers
14
4.4
Climate and Length of Operating Season
14
4.5
Infrastructure
14
5
History
14
5.1
Previous Operation
14
5.2
Previous Exploration
15
6
Geological Setting, Mineralization and Deposit
15
6.1
Regional, Local and Property Geology
15
6.2
Mineralization
15
6.3
Deposits
16
 
 
ex962p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
7
Exploration
17
7.1
Nature and Extent of Exploration
17
7.2
Non-Drilling Procedures and Parameters
19
7.3
Drilling Procedures
19
7.4
Hydrology
19
7.5
Geotechnical Data
20
8
Sample Preparation, Analyses and Security
20
8.1
Prior to Sending to the Lab
20
8.2
Lab Procedures
20
9
Data Verification
21
9.1
Procedures of Qualified Person
21
9.2
Limitations
21
9.3
Opinion of Qualified Person
21
10
Mineral Processing and Metallurgical Testing
22
10.1
Testing
 
Procedures
22
10.2
Relationship of Tests
 
to the Whole
22
10.3
Lab Information
23
10.4
Relevant Results
23
11
Mineral Resource Estimates
23
11.1
Assumptions, Parameters and Methodology
23
11.1.1
Geostatistical Analysis for Classification
24
11.2
Qualified Person’s Estimates
28
11.3
Resources Exclusive of Reserves
28
11.3.1
Initial Economic Assessment
28
11.4
Qualified Person’s Opinion
29
12
Mineral Reserve Estimates
30
12.1
Assumptions, Parameters and Methodology
30
12.2
Qualified Person’s Estimates
31
12.3
Qualified Person’s Opinion
32
13
Mining Methods
33
13.1
Geotech and Hydrology
33
13.2
Production Rates
33
13.3
Mining Related Requirements
34
13.4
Required Equipment and Personnel
34
14
Processing and Recovery Methods
35
14.1
Description or Flowsheet
35
14.2
Requirements for Energy,
 
Water,
 
Material and Personnel
35
15
Infrastructure
36
16
Market Studies
37
16.1
Market Description
37
 
 
ex962p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
16.2
Price Forecasts
37
16.3
Contract Requirements
38
17
Environmental Studies, Permitting and Plans, Negotiations or Agreements
with Local Individuals
38
17.1
Results of Studies
38
17.2
Requirements and Plans for Waste Disposal
38
17.3
Permit Requirements and Status
38
17.4
Local Plans, Negotiations or Agreements
40
17.5
Mine Closure Plans
40
17.6
Qualified Person’s Opinion
40
18
Capital and Operating Costs
40
18.1
Capital Cost Estimate
40
18.2
Operating Cost Estimate
41
19
Economic Analysis
42
19.1
Assumptions, Parameters and Methods
42
19.2
Results
44
19.3
Sensitivity
47
20
Adjacent Properties
47
20.1
Information used
47
21
Other Relevant Data and Information
48
22
Interpretation and Conclusions
48
22.1
Conclusion
48
22.2
Risk Factors
48
22.2.1
Governing Assumptions
49
22.2.2
Limitations
50
22.2.3
Methodology
50
22.2.4
Development of the Risk Matrix
51
22.2.5
Categorization of Risk Levels and Color Code Convention
53
22.2.6
Description of the Coal Property
53
22.2.7
Summary of Residual Risk Ratings
54
22.2.8
Risk Factors
54
23
Recommendations
60
24
References
60
25
Reliance on Information Provided by the Registrant
60
Figures (in Report)
Figure 1-1:
 
Coronado Buchanan Mine Complex Property Location Map
2
Figure 1-2:
 
CAPEX
5
Figure 1-3:
 
OPEX
6
Figure 1-4:
 
Sensitivity of NPV
9
 
 
ex962p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Figure 6-1:
 
Buchanan Stratigraphic Column
16
Figure 7-1: Generalized Buchanan Cross-Section
18
Figure 11-1:
 
Histogram of the Total
 
Seam Thickness for the Pocahontas No. 3
Seam Present in the Buchanan Mine Complex
25
Figure 11-2:
 
Scatter plot of the Total
 
Seam Thickness for the Pocahontas No. 3
Seam Present in the Buchanan Mine Complex
25
Figure 11-3: Variogram
 
of the Total
 
Seam Thickness for the Pocahontas No. 3
Seam
 
Present in the Buchanan Mine Complex
26
Figure 11-4: Result of DHSA for the Pocahontas No. 3 Seam Present in the
Buchanan Mine Complex
27
Figure 11-5:
 
Results of Initial Economic Assessment
29
Figure 15-1:
 
Buchanan Surface Facilities
36
Figure 18-1:
 
CAPEX
41
Figure 19-1:
 
Cash Costs per Tonne
44
Figure 19-2:
 
Sensitivity of NPV
47
Tables
 
(in Report)
Table
 
1-1:
 
Coal Resources Summary as of December 31, 2021
3
Table
 
1-2:
 
Coal ROM (Moist) Summary as of December 31, 2021
4
Table
 
1-3:
 
Coal Reserves Summary (Marketable Sales Basis) as of December 31,
2021
4
Table
 
1-4:
 
Life-of-Mine Tonn
 
age, P&L before Tax,
 
and EBITDA
7
Table
 
1-5:
 
Project Cash Flow Summary (000)
7
Table
 
11-1:
 
General Reserve and Resource Criteria
24
Table
 
11-2:
 
DHSA Results Summary for Radius from a Central Point
27
Table
 
11-3:
 
Coal Resources Summary as of December 31, 2021
28
Table
 
11-4:
 
Results of Initial Economic Assessment
29
Table
 
12-1:
 
Coal ROM (Moist) Summary as of December 31, 2021
32
Table
 
12-2:
 
Coal Reserves Summary (Marketable Sales Basis) as of December
31, 2021
32
Table
 
13-1:
 
Summary of Production by Year (Tonnes
 
x 1,000)
34
Table
 
16-1:
 
Quality Specifications by Product
37
Table
 
17-1:
 
Buchanan Mining Permit
39
Table
 
18-1:
 
Estimated Coal Production Taxes
 
and Sales Costs
42
Table
 
18-2:
 
Buchanan Mine Operating Costs
42
Table
 
19-1:
 
Life-of-Mine Tonnage,
 
P&L before Tax,
 
and EBITDA
45
Table
 
19-2:
 
Summary of Buchanan Key Financial Performance Metrics (2022-
2029)
45
Table
 
19-3:
 
Project Cash Flow Summary (000)
46
Table
 
22-1:
 
Probability Level Table
51
Table
 
22-2:
 
Consequence Level Table
52
 
 
ex962p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Table
 
22-3:
 
Risk Matrix
53
Table
 
22-4:
 
Risk Assessment Matrix
54
Table
 
22-5:
 
Geological and Coal Resource Risk Assessment (Risks 1 and 2)
55
Table
 
22-6:
 
Environmental (Risks 3 and 4)
56
Table
 
22-7:
 
Regulatory Requirements (Risk 5)
56
Table
 
22-8:
 
Market and Transportation (Risk 6)
57
Table
 
22-9:
 
Market and Transportation (Risk 7)
57
Table
 
22-10:
 
Methane Management (Risk 8)
58
Table
 
22-11:
 
Mine Fires (Risk 9)
58
Table
 
22-12:
 
Availability of Supplies and Equipment (Risk 10)
59
Table
 
22-13:
 
Labor – Work Stoppage (Risk 11)
59
Table
 
22-14:
 
Labor – Retirement (Risk 12)
60
Table
 
25-1:
 
Information from Registrant Relied Upon by MM&A
61
Appendices
A
Biographies
B
Map
C
Glossary of Terms
D
Initial Economic Assessment for Resources Exclusive of Reserves
E
JORC Table
 
1
 
 
ex962p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
1
Executive Summary
1.1
 
Property Description
Coronado Global Resources Inc. (
Coronado
)
authorized
Marshall Miller & Associates,
Inc.
 
(
MM&A
)
to
 
prepare
 
this
 
Technical
 
Report
 
Summary
 
(
TRS
)
 
of
 
its
 
controlled
 
coal
resources and
 
reserves located
 
at the
Buchanan Division
 
(
Buchanan
)
 
in Buchanan
 
and
Tazewell
 
Counties,
 
Virginia
 
(the
Property
).
 
This
 
report
 
provides
 
a
 
statement
 
of
 
coal
resources
 
and
 
coal
 
reserves
 
for
 
Coronado, as
 
defined
 
under
 
the
Australasian
 
Code
 
for
Reporting of Exploration Results, Mineral
 
Resources and Ore Reserves
(
JORC Code
)
as well as
 
under Subpart 1300
 
of Regulation S-K
 
(Regulation S-K 1300)
 
promulgated by the
United
 
States
 
Securities
 
and
 
Exchange
 
Commission
 
(
SEC
)
.
 
This
 
report
 
was
 
also
prepared
 
in accordance
 
with the
Australasian Code
 
for Public
 
Reporting of
 
Technical
Assessments and Valuations of Mineral Assets
(
VALMIN Code
).
Coal resources and coal reserves
 
are herein reported in imperial
 
units of measurement and
are rounded to millions of metric tonnes (
Mt
).
 
The Buchanan
 
No. 1
 
Mine Complex
 
is located
 
in Buchanan
 
County in
 
southwest Virginia.
 
The
 
Property
 
is
 
24
 
kilometers
 
northwest
 
of
 
the
 
town
 
of
 
Richlands,
 
Virginia
 
and
 
65.9
kilometers
 
southeast
 
of
 
Pikeville,
 
Kentucky.
 
The
 
nearest
 
major
 
population
 
centers
 
are
Lexington,
 
Kentucky
 
(290
 
kilometers
 
northwest)
 
and
 
Roanoke,
 
Virginia
 
(153
 
kilometers
northeast)
 
(see
Figure
 
1-1
).
 
The
 
Property
 
is
 
composed
 
of
 
approximately
 
34,089
 
total
hectares,
 
of
 
which
 
26,243
 
are
 
leased
 
or
 
subleased
 
from
 
private
 
landholders
 
under
approximately 150 individual coal
 
lease tracts, and
 
7,846 hectares are
 
owned by Coronado.
 
Subject to
 
Coronado’s exercising
 
its renewal
 
rights thereunder,
 
all the
 
leases expire
 
upon
exhaustion of the relevant coal reserves, which is expected to occur in 2047.
 
 
 
ex962p2i0.jpg ex962p11i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Figure 1-1:
 
Coronado Buchanan Mine Complex Property Location
 
Map
1.2
 
Ownership
The Property was formerly controlled by
Consolidation Coal Company (
CONSOL
)
.
 
Mine
development
 
was
 
started
 
by
 
CONSOL
 
in
 
1983
 
and
 
longwall
 
production
 
began
 
in
 
1987.
 
Coronado acquired the Buchanan Mine from CONSOL in March 2016.
1.3
 
Geology
Operations
 
at
 
the
 
Buchanan
 
Mine
 
Complex
 
extract
 
the
 
Pocahontas
 
No.
 
3
 
coal
 
bed
 
by
longwall mining
 
methods.
 
Strata of
 
economic interest
 
for this
 
TRS are
 
of the
 
Pennsylvanian-
age
 
Pocahontas
 
Formation
 
and
 
the
 
subject
 
Pocahontas
 
No.
 
3
 
seam
 
is
 
the
 
principal
 
coal
seam of
 
that formation.
 
Due to
 
the high
 
value of
 
this low-volatile
 
coking coal,
 
it has
 
been
extensively
 
mined
 
in
 
the
 
region.
 
The
 
seam
 
is
 
situated
 
below
 
drainage
 
throughout
 
the
Property and is accessed by existing mine shafts.
1.4
 
Exploration Status
The
 
Property
 
has
 
been
 
extensively
 
explored,
 
largely
 
by
 
drilling
 
using
 
continuous
 
coring
methods,
 
rotary
 
drilling
 
but
 
also
 
by
 
obtaining
 
coal
 
measurements
 
at
 
mine
 
exposures,
ongoing
 
drilling
 
associated
 
with
 
degas
 
activities,
 
and
 
by
 
downhole
 
geophysical
 
methods.
 
The
 
majority
 
of
 
the
 
data
 
was
 
acquired
 
or
 
generated
 
by
 
previous
 
owners
 
of
 
the
 
Property.
 
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
These sources comprise the primary
 
data used in the evaluation of
 
the coal resources and
coal reserves
 
on the Property.
 
MM&A examined
 
the data available
 
for the
 
evaluation and
incorporated all pertinent information into
 
this TRS.
 
Where data appeared to be
 
anomalous
or
 
not
 
representative, that
 
data
 
was
 
excluded
 
from the
 
digital
 
databases
 
and
 
subsequent
processing by MM&A.
 
Ongoing exploration has been
 
carried out by
 
Coronado since acquiring the
 
Buchanan Mine.
 
The exploration data acquired by Coronado has been consistent with past drilling activities.
1.5
 
Operations and Development
Due to its coal reserve and
 
seam characteristics, the Buchanan No. 1 Mine
 
operates using
the longwall method.
 
The model was therefore generated
 
with longwall-mining constraints
in mind for Buchanan’s underground resources.
 
The mine produces coal that
 
is suitable for
the low-volatile metallurgical coal markets.
The Buchanan
 
No. 1
 
Mine in
 
Buchanan
 
County,
 
Virginia,
 
is the
 
only active
 
longwall mine
currently being operated by Coronado.
Coronado
 
currently operates
 
a
 
coal preparation
 
plant
 
at Buchanan.
 
The Buchanan
 
Plant
operates at
 
a feed
 
rate of
 
approximately 1,270
 
raw tonnes
 
per hour
 
(
tph)
.
 
Processes are
typical of those used in the coal industry and are in use at adjacent coal processing plants.
1.6
 
Mineral Resource
Mineral resources, representing
 
in-situ coal in
 
which a portion
 
of reserves are
 
derived, are
presented below.
 
A coal resource estimate,
 
summarized in
Table
 
1-1
, was prepared as
 
of
December 31, 2021, for property controlled by Coronado.
Table 1-1:
 
Coal Resources Summary as of December 31, 2021
 
Coal Resource (Dry Tonnes, In Situ, Mt)
Resource Quality (Dry)
Area
Measured
Indicated
Inferred
Total
Ash%
Sulfur%
VM%
Inclusive of Reserves
157.0
19.0
0.0
176.1
25
0.7
16
Exclusive of Reserves
10.7
3.6
0.0
14.3
Total 12/31/2021
167.7
22.6
0.0
190.3
 
Note:
 
Resource tonnes are inclusive of reserve tonnes
 
since they include the in-situ tonnes from which
 
recoverable coal reserves
are derived.
Note 2:
 
Coal resources are reported
 
on a dry basis.
 
Surface moisture and inherent moisture are excluded.
Note 3: The Property contains 14.3 Mt of dry, in-place measured and
 
indicated coal resources exclusive of reserves as
 
of
December 31, 2021.
1.7
 
Mineral Reserve
Reserve
 
tonnage
 
estimates
 
provided
 
herein
 
report
 
coal
 
reserves
 
derived
 
from
 
the
 
in-situ
resource
 
tons presented
 
in
Table
 
1-1
,
 
and not
 
in
 
addition to
 
coal
 
resources.
 
Proven
 
and
probable
 
coal
 
reserves
 
were
 
derived
 
from
 
the
 
defined
 
coal
 
resource
 
considering
 
relevant
mining,
 
processing,
 
infrastructure, economic
 
(including
 
estimates of
 
capital,
 
revenue, and
cost),
 
marketing,
 
legal,
 
environmental,
 
socio-economic
 
and
 
regulatory
 
factors.
 
The
Resource estimate has been used as
 
the basis for this Reserve calculation,
 
which utilizes a
reasonable
 
preliminary
 
feasibility
 
study,
 
a
 
life-of-mine
 
(
LOM
)
 
mine
 
plan
 
and
 
practical
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
recovery factors.
 
Production modeling
 
was completed
 
with an
 
effective start
 
date of
 
October
1, 2021.
 
Additions and depletion have been used to bring the Reserve estimate forward to
December 31, 2021.
Factors that would typically preclude conversion of a coal resource
 
to coal reserve, include
the following:
 
inferred resource classification; absence of coal quality; poor mine recovery;
lack of
 
access; geological
 
encumbrances associated
 
with overlying
 
and underlying
 
strata;
seam thinning;
 
structural complication;
 
and insufficient
 
exploration have
 
all been
 
considered.
 
Reserve
 
consideration
 
excludes
 
those
 
portions
 
of
 
the
 
resource
 
area
 
which
 
exhibit
 
the
aforementioned-geological and operational encumbrances.
 
Coal
 
reserves
 
are
 
presented
 
on
 
a
 
run-of-mine
 
(ROM)
 
basis
 
in
Table
 
1-2
.
 
Proven
 
and
probable
 
coal
 
reserves
 
were
 
derived
 
from
 
the
 
defined
 
in-situ
 
coal
 
resource
 
considering
relevant processing, economic (including technical estimates of capital, revenue,
 
and cost),
marketing,
 
legal,
 
environmental,
 
socioeconomic,
 
and
 
regulatory
 
factors.
 
The
 
proven
 
and
probable coal reserves on the Property are summarized below in
Table
 
1-3
.
Table 1-2:
 
Coal ROM (Moist) Summary as of December 31, 2021
 
Demonstrated Coal Reserves (Mt, Moist ROM)
Quality (Dry)
 
By Reliability Category
By Mining Type
By Control Type
Area /
Mine
Proven
Probable
Total
Surface
UG
Owned
Leased
Subleased
Ash
Sulfur
Vol
Buchanan
142.3
17.3
159.6
0.0
159.6
25.8
128.8
5.0
42
0.7
12
Table 1-3:
 
Coal Reserves Summary (Marketable Sales Basis) as of
 
December 31, 2021
 
Demonstrated Coal Reserves (Wet Tons, Washed or Direct Shipped, Mt)
Quality (Dry Basis)
 
By Reliability Category
By Mining Type
By Control Type
Area / Mine
Proven
Probable
Total
Surface
UG
Owned
Leased
Subleased
Ash%
Sulfur%
VM%
Buchanan Mine
Complex
87.4
10.6
98.0
0.0
98.0
17.0
77.5
3.4
6
0.7
19
 
Note: Marketable reserve tonnes are reported
 
on a moist basis, including a combination of
 
surface and inherent moisture.
 
The
combination of surface and inherent moisture is
 
modeled between 4.5 and 6-percent, depending
 
upon mining method.
 
Actual
product moisture is dependent upon multiple geological
 
factors, operational factors, and product contract
 
specifications and can
exceed 8-percent.
 
As such, the modeled moisture values provide a level
 
of conservatism for reserve reporting.
In summary, Coronado controls a total of
 
98.0 Mt (moist basis)
 
of marketable coal reserves,
at Buchanan,
 
as of
 
December 31,
 
2021.
 
Of that
 
total, 89
 
percent are
 
proven, and
 
11 percent
are probable.
 
There are
 
17.0 Mt
 
of owned
 
coal reserves
 
and 77.5
 
Mt of
 
leased coal
 
reserves
and 3.4
 
Mt of
 
subleased reserves.
 
All the
 
Buchanan reserves
 
are considered
 
suitable for
the metallurgical coal market, and all of the Buchanan reserves are assigned.
1.8
 
Capital Summary
Coronado provided MM&A
 
with an inventory
 
of operating equipment
 
available at Buchanan.
 
MM&A’s
 
capital schedules assume that major
 
equipment rebuilds occur over the
 
course of
each machine’s remaining
 
assumed operating life.
 
Replacement equipment was
 
scheduled
based on MM&A’s
 
experience and knowledge of mining equipment and
 
industry standards
with respect to
 
the useful life
 
of such equipment.
 
A summary of
 
the estimated capital
 
for the
Property is provided in
Figure 1-2
 
below.
 
 
ex962p2i0.jpg ex962p14i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Figure 1-2:
 
CAPEX
1.9
 
Operating Costs
Coronado
 
provided
 
historical
 
and
 
preliminary
 
5-year
 
projections
 
of
 
operating
 
costs
 
for
Buchanan for MM&A’s review.
 
MM&A used the historical
 
and/or budget cost information
 
as
a reference and developed personnel schedules for the mine and
 
support facilities.
 
Hourly
labor
 
rates
 
and
 
salaries
 
were
 
based
 
upon
 
information
 
contained
 
in
 
Coronado’s
 
financial
summaries.
 
Fringe-benefit
 
costs
 
were
 
developed
 
for
 
vacation
 
and
 
holidays,
 
federal
 
and
state
 
unemployment
 
insurance,
 
retirement,
 
workers’
 
compensation
 
and
 
pneumoconiosis,
casualty and
 
life insurance, healthcare,
 
and bonuses.
 
A cost
 
factor for mine
 
supplies was
developed that relates expenditures
 
to mine advance rates
 
for roof-control costs and
 
other
mine-supply costs
 
at underground
 
mines.
 
Other factors
 
were developed
 
for maintenance
and repair costs, rentals, mine power, outside services and other direct mining costs.
 
Operating
 
costs
 
factors
 
were
 
also
 
developed
 
for
 
the
 
coal
 
preparation
 
plant
 
processing,
refuse
 
handling,
 
coal
 
loading,
 
property
 
taxes,
 
and
 
insurance
 
and
 
bonding.
 
Appropriate
royalty
 
rates
 
were
 
assigned
 
for
 
production
 
from
 
leased
 
coal
 
lands,
 
and
 
sales
 
taxes
 
were
calculated for state
 
severance taxes, the
 
federal black lung
 
excise tax, and
 
federal and state
reclamation fees.
A summary of the projected operating costs for the Property is provided in
Figure 1-3
.
 
 
ex962p2i0.jpg ex962p15i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
Figure 1-3:
 
OPEX
1.10
 
Economic Evaluation
The pre-feasibility
 
financial model
 
prepared for
 
this TRS
 
was developed
 
to test
 
the economic
viability
 
of the
 
coal resource
 
area.
 
The results
 
of this
 
financial model
 
are not
 
intended to
represent a bankable feasibility study,
 
required for financing of any current or future mining
operations
 
contemplated
 
for
 
the
 
Coronado
 
properties,
 
but
 
are
 
intended
 
to
 
establish
 
the
economic viability
 
of the estimated
 
coal reserves.
 
Cash flows
 
are simulated
 
on an annual
basis in
 
nominal dollars
 
assuming a
 
2% inflation
 
rate based
 
on projected
 
production from
the
 
coal
 
reserves.
 
The
 
discounted
 
cash
 
flow
 
analysis
 
presented
 
herein
 
is
 
based
 
on
 
an
effective date of January 1, 2022.
 
On
 
an
 
un-levered
 
basis,
 
the
 
net
 
present
 
value
 
(
NPV
)
 
of
 
the
 
project
 
cash
 
flow
 
after
 
taxes
represents
 
the
 
Enterprise
 
Value
 
of
 
the
 
project.
 
The
 
project
 
cash
 
flow,
 
excluding
 
debt
service,
 
is
 
calculated
 
by
 
subtracting
 
direct
 
and
 
indirect
 
operating
 
expenses
 
and
 
capital
expenditures from
 
revenue.
 
Direct costs
 
include labor, operating
 
supplies, maintenance
 
and
repairs, facilities
 
costs for
 
materials handling,
 
coal preparation,
 
refuse disposal,
 
coal loading,
reclamation
 
and
 
general
 
and
 
administrative
 
costs.
 
Indirect
 
costs
 
include
 
statutory
 
and
legally agreed
 
upon fees
 
related to
 
direct extraction
 
of the
 
mineral.
 
The indirect
 
costs are
the
 
federal
 
black
 
lung
 
tax,
 
federal
 
and
 
state
 
reclamation
 
taxes,
 
property
 
taxes,
 
coal
production royalties, and income taxes.
 
Table
 
1-4
 
shows
 
LOM
 
tonnage,
 
profit
 
&
 
loss
 
(
P&L
),
 
and
 
earnings
 
before
 
income
 
tax,
depreciation & amortization (
EBITDA
) for Buchanan.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
Table 1-4:
 
Life-of-Mine Tonnage, P&L before Tax, and EBITDA
 
LOM
LOM
P&L
LOM
EBITDA
 
Tonnes
Pre-Tax P&L
Per Tonne
EBITDA
Per Tonne
Buchanan
98,005
$5,181,446
$52.87
$7,073,988
$72.18
As shown in
Table 1-4,
 
the Buchanan Mine shows positive EBITDA over
 
the LOM.
 
Overall,
the Coronado
 
consolidated operations
 
show positive
 
LOM P&L
 
and LOM
 
EBITDA of
 
$5.2
billion and $7.1 billion, respectively.
 
Coronado’s consolidated
 
Buchanan cash flow summary
 
in nominal dollars
 
assuming a 2%
interest rate, excluding debt service, is shown in
Table
 
1-5
 
below.
Table 1-5:
 
Project Cash Flow Summary (000)
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
Total
2022
2023
2024
2025
2026
Production & Sales tonnes
98,006
4,336
3,813
3,744
3,695
4,538
Total
 
Revenue
$14,909,133
$852,553
$453,707
$442,240
$453,787
$571,159
EBITDA
$7,073,988
$551,294
$186,311
$165,773
$172,414
$271,491
Net Income
$4,054,532
$377,442
$93,097
$72,548
$75,185
$145,767
Net Cash Provided by Operating Activities
$5,859,417
$337,923
$226,272
$153,087
$153,971
$213,893
Purchases of Property, Plant, and
Equipment
$(1,472,794)
$(86,124)
$(100,502)
$(83,189)
$(56,642)
$(41,201)
Net Cash Flow
$4,386,623
$251,799
$125,770
$69,897
$97,330
$172,692
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2027
2028
2029
2030
2031
2032
Production & Sales tonnes
4,336
4,317
4,563
4,743
3,952
4,271
Total
 
Revenue
$557,876
$567,848
$613,229
$651,531
$554,839
$612,889
EBITDA
$261,229
$263,595
$298,286
$329,317
$241,336
$290,107
Net Income
$137,877
$136,093
$168,482
$198,902
$134,763
$170,606
Net Cash Provided by Operating Activities
$224,239
$225,319
$245,987
$268,534
$221,190
$234,873
Purchases of Property, Plant, and
Equipment
$(64,303)
$(42,396)
$(43,244)
$(44,109)
$(69,604)
$(70,996)
Net Cash Flow
$159,936
$182,923
$202,743
$224,425
$151,586
$163,877
 
 
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2033
2034
2035
2036
2037
2038
Production & Sales tonnes
3,108
3,839
3,939
3,095
3,340
3,854
Total
 
Revenue
$455,561
$575,148
$603,143
$484,105
$533,867
$629,465
EBITDA
$171,051
$260,914
$280,917
$178,788
$209,249
$308,476
Net Income
$81,103
$150,643
$164,665
$84,421
$111,746
$188,224
Net Cash Provided by Operating Activities
$173,291
$204,491
$231,972
$176,230
$175,626
$239,334
Purchases of Property, Plant, and
Equipment
$(46,809)
$(47,745)
$(48,700)
$(76,848)
$(50,667)
$(51,681)
Net Cash Flow
$126,482
$156,746
$183,272
$99,382
$124,959
$187,653
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2039
2040
2041
2042
2043
2044
Production & Sales tonnes
4,722
4,655
3,755
3,575
3,583
3,399
Total
 
Revenue
$787,800
$793,604
$622,752
$614,673
$623,815
$595,730
EBITDA
$447,013
$443,613
$291,006
$284,502
$313,239
$288,266
Net Income
$294,103
$290,483
$171,552
$167,105
$191,132
$171,155
Net Cash Provided by Operating Activities
$337,444
$359,579
$270,111
$240,394
$255,553
$244,949
Purchases of Property, Plant, and
Equipment
$(52,714)
$(53,768)
$(82,766)
$(52,909)
$(53,968)
$(55,047)
Net Cash Flow
$284,729
$305,811
$187,345
$187,485
$201,586
$189,902
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2045
2046
2047
2048
2049
2050
Production & Sales tonnes
3,154
2,845
836
-
-
-
Total
 
Revenue
$573,015
$527,068
$157,730
$-
$-
$-
EBITDA
$271,208
$272,078
$22,517
$-
$-
$-
Net Income
$157,961
$159,633
$(32,899)
$(4,084)
$(1,660)
$(850)
Net Cash Provided by Operating Activities
$230,687
$227,781
$74,345
$(51,806)
$(17,614)
$(8,983)
Purchases of Property, Plant, and
Equipment
$(56,148)
$(40,714)
$-
$-
$-
$-
Net Cash Flow
$174,539
$187,067
$74,345
$(51,806)
$(17,614)
$(8,983)
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2051
2052
2053
2054
2055
2056
Production & Sales tonnes
-
-
-
-
-
-
Total
 
Revenue
$-
$-
$-
$-
$-
$-
EBITDA
$-
$-
$-
$-
$-
$-
Net Income
$(436)
$(226)
$(0)
$(0)
$(0)
$(0)
Net Cash Provided by Operating Activities
$(4,581)
$(4,673)
$-
$-
$-
$-
Purchases of Property, Plant, and
Equipment
$-
$-
$-
$-
$-
$-
Net Cash Flow
$(4,581)
$(4,673)
$-
$-
$-
$-
Consolidated
 
cash
 
flows
 
are
 
driven
 
by
 
annual
 
sales
 
tonnage,
 
which
 
at
 
steady-state
 
level
ranges
 
from
 
a
 
peak
 
of
 
4.7
 
million
 
tonnes
 
in
 
2030
 
to
 
a
 
low
 
of
 
0.8
 
million
 
tonnes
 
in
 
2047.
 
Projected consolidated
 
revenue ranges
 
from $442.2
 
million to
 
$852.6 million
 
at steady
 
state.
 
Revenue totals $14.9 billion for the project’s life.
Consolidated
 
cash
 
flow
 
from
 
operations
 
is
 
positive
 
throughout
 
the
 
projected
 
operating
period,
 
with
 
the
 
exception
 
of
 
post-production
 
years,
 
due
 
to
 
end-of-mine
 
reclamation
spending.
 
Consolidated
 
cash
 
flow
 
from
 
operations
 
peaks
 
at
 
$337.9
 
million
 
in
 
2022
 
and
totals $5.9
 
billion over
 
the project’s
 
life.
 
Capital expenditures
 
total $367.7
 
million through
2026 and $1.5 billion over the project’s life.
 
 
 
ex962p2i0.jpg
 
 
 
ex962p18i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
9
1.10.1
 
Discounted Cash Flow Analysis
Cash
 
flow
 
after
 
tax,
 
but
 
before
 
debt
 
service,
 
generated
 
over
 
the
 
life
 
of
 
the
 
project
 
was
discounted to NPV
 
at a 10.0%
 
discount rate, which
 
represents Coronado’s
 
estimate of the
nominal
 
dollar,
 
risk
 
adjusted
 
weighted
 
average
 
cost
 
of
 
capital
 
(
WACC
)
 
for
 
likely
 
market
participants if the subject reserves were offered
 
for sale.
 
On an un-levered basis, the NPV
of
 
the
 
project
 
cash
 
flows
 
represents
 
the
 
Enterprise
 
Value
 
of
 
the
 
project
 
and
 
amounts
 
to
$1.580 billion.
 
The pre-feasibility
 
financial model
 
prepared for
 
the TRS
 
was developed
 
to
test
 
the
 
economic
 
viability
 
of
 
each
 
coal
 
resource
 
area.
 
The
 
NPV
 
estimate
 
was
 
made
 
for
purposes of
 
confirming the
 
economics for
 
classification of
 
coal reserves
 
and not
 
for purposes
of
 
valuing
 
Coronado
 
or its
 
Buchanan
 
assets.
 
Mine
 
plans
 
were
 
not
 
optimized,
 
and
 
actual
results of
 
the operations
 
may be
 
different, but
 
in all
 
cases, the
 
mine production
 
plan assumes
the properties are under competent management.
1.10.2
 
Sensitivity Analysis
Sensitivity of the NPV results to changes in
 
the key drivers is presented in the chart
 
below.
 
The
 
sensitivity
 
study
 
shows
 
the
 
NPV
 
at
 
the
 
10.0%
 
discount
 
rate
 
when
 
Base
 
Case
 
sales
prices, operating costs, and capital costs are increased
 
and decreased in increments of 5%
within a +/- 15% range.
Figure 1-4:
 
Sensitivity of NPV
As shown,
 
NPV is
 
quite sensitive
 
to changes
 
in sales
 
price and
 
operating cost
 
estimates,
and slightly sensitive to changes in capital cost estimates.
1.11
 
Permitting
Coronado has
 
obtained all
 
mining and
 
discharge permits
 
to operate
 
its mine
 
and processing,
loadout, or related support facilities.
 
MM&A is unaware of
 
any obvious or current Coronado
permitting issues
 
that are
 
expected to
 
prevent the
 
issuance of
 
future permits.
 
Buchanan,
 
 
ex962p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
10
along with all
 
coal producers, is
 
subject to a
 
level of uncertainty
 
regarding future clean
 
water
permits due to
United States Environmental Protection Agency
(
EPA
)
 
involvement with
state programs.
1.12
 
Conclusion and Recommendations
Sufficient data have been obtained
 
through various exploration and
 
sampling programs and
mining operations to support the geological interpretations of seam structure and thickness
for coal horizons situated on the Property.
 
The data are of sufficient quantity and
 
reliability
to reasonably support the coal resource and coal reserve estimates in this TRS.
The geological data and
 
preliminary feasibility study, which consider mining
 
plans, revenue,
and operating
 
and capital
 
cost estimates
 
are sufficient
 
to support
 
the classification
 
of coal
reserves provided herein.
This
 
geologic
 
evaluation
 
conducted
 
in
 
conjunction
 
with
 
the
 
preliminary
 
feasibility
 
study
concludes
 
that
 
the
 
98.0
 
Mt
 
of
 
marketable
 
underground
 
coal
 
reserves
 
identified
 
on
 
the
Property
 
are
 
economically
 
mineable
 
under
 
reasonable
 
expectations
 
of
 
market
 
prices
 
for
metallurgical coal products, estimated operation costs, and capital expenditures.
2
Introduction
2.1
 
Registrant and Terms of Reference
This report
 
was prepared
 
for the
 
sole use
 
of
Coronado Global
 
Resources Inc.
 
(
Coronado
)
and its affiliated and
 
subsidiary companies and advisors.
 
This report provides a statement
of coal resources
 
and coal reserves
 
for Coronado, as
 
defined under
 
the
Australasian Code
for
 
Reporting
 
of
 
Exploration
 
Results,
 
Mineral
 
Resources
 
and
 
Ore
 
Reserves
(
JORC
Code
) as
 
well as
 
under Subpart
 
1300 of
 
Regulation S-K (Regulation
 
S-K 1300)
 
promulgated
by the
United States Securities
 
and Exchange Commission
 
(
SEC
)
.
 
This report was
 
also
prepared
 
in accordance
 
with the
Australasian Code
 
for Public
 
Reporting of
 
Technical
Assessments and Valuations of Mineral Assets
(
VALMIN Code
).
This
 
report
 
provides
 
a
 
statement
 
of
 
coal
 
resources
 
and
 
coal
 
reserves
 
for
 
Coronado
 
at
Buchanan.
 
Exploration results
 
and Resource
 
calculations were
 
used as
 
the basis
 
for the
mine planning
 
and the
 
preliminary feasibility
 
study completed
 
to determine
 
the extent
 
and
viability of the reserve.
Coal resources
 
and coal reserves
 
are herein reported
 
in metric
 
units of
 
measurement and
are rounded to millions of metric tonnes (
Mt
).
2.2
 
Information Sources
This
 
TRS
 
is
 
based
 
on
 
information
 
provided
 
by
 
Coronado
 
and
 
reviewed
 
by
 
Michael
 
G.
McClure, CPG; and Justin S. Douthat, PE, MBA.
 
 
 
ex962p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
11
Coronado
 
engaged
 
MM&A
 
to
 
conduct
 
a
 
coal
 
resource
 
and
 
reserve
 
evaluation
 
of
 
the
Coronado coal
 
properties as
 
of September
 
30, 2018.
 
Additions and
 
depletion have
 
been
used
 
to
 
bring
 
the
 
Resource
 
and
 
Reserve
 
estimates
 
forward
 
to
 
December
 
31,
 
2021,
 
the
effective date of this TRS
 
for Buchanan.
 
For the evaluation, the following tasks were
 
to be
completed:
 
>
 
Conduct site visits of the mines and mine infrastructure facilities;
 
>
 
Process
 
the
 
information
 
supporting
 
the
 
estimation
 
of
 
coal
 
resources
 
and
 
reserves
 
into
geological models;
 
>
 
Develop life-of-reserve mine (
LOM
) plans and financial models;
>
 
Hold discussions with Coronado company management; and
 
>
 
Prepare
 
and
 
issue a
 
TRS providing
 
a
 
statement
 
of coal
 
resources and
 
reserves which
would include:
-
 
A description of the mine and facilities.
 
-
 
A description of the evaluation process.
-
 
An
 
estimation
 
of
 
coal
 
resources
 
and
 
reserves
 
with
 
compliance
 
elements
 
as
 
stated
under the JORC Code and the SEC Regulation S-K 1300.
2.3
 
Personal Inspections
MM&A is very familiar with Buchanan,
 
having provided a variety of services
 
in recent years,
and the QPs involved in this TRS have conducted multiple site visits.
3
Property Description
3.1
 
Location
The Buchanan Mine Complex is located in Buchanan County in southwestern Virginia (see
Figure 1-1
) approximately
 
16 kilometers
 
southeast of
 
Grundy,
 
which is
 
the county
 
seat of
Buchanan County.
 
Surface facilities for
 
the shaft mine are
 
located along Garden Creek
 
and
a Norfolk Southern
 
(NS) rail
 
line about 6.4
 
kilometers south-southeast of
 
Oakwood, Virginia.
The
 
Property
 
is
 
located
 
on
 
the
 
following
United
 
States
 
Geological
 
Survey
 
(
USGS
)
Quadrangles:
 
Prater,
 
Vansant,
 
Keen
 
Mountain,
 
and
 
Jewell
 
Ridge.
 
Current
 
mining
projections
 
fall
 
within
 
the Keen
 
Mountain and
 
Jewell
 
Ridge quadrangles.
 
The
 
coordinate
system and
 
datum used for
 
the model of
 
Buchanan No. 1
 
and the
 
subsequent maps were
produced in the Virginia State Plane South system, NAD 27.
 
3.2
 
Titles, Claims or Leases
The Buchanan coal
 
reserves are located
 
in Buchanan and
 
Tazewell Counties, Virginia.
 
The
Property is
 
composed of
 
approximately 34,089
 
total hectares,
 
of which
 
26,243 are
 
leased
or subleased from private landholders under approximately 150 individual
 
coal lease tracts,
 
 
ex962p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
12
and 7,846 hectares are owned by Coronado.
 
Subject to Coronado’s exercising its renewal
rights thereunder, all the leases
 
expire upon exhaustion
 
of the relevant
 
coal reserves, which
is expected to occur in 2047.
 
MM&A has not carried out a
 
separate title verification for the
coal
 
property
 
and
 
has
 
not
 
verified
 
leases,
 
deeds,
 
surveys,
 
or
 
other
 
property
 
control
instruments
 
pertinent
 
to
 
the
 
subject
 
resources.
 
Tenure
 
was
 
separately
 
reviewed
 
by
Coronado’s legal advisors.
 
Coronado has represented to MM&A that it controls the mining
rights
 
to the
 
reserves as
 
shown on
 
its property
 
maps, and
 
MM&A has
 
accepted
 
these as
being a true and accurate depiction of the mineral rights controlled by Coronado.
 
The TRS
assumes the Property
 
is developed under responsible and experienced management.
3.3
 
Mineral Rights
Coronado supplied property
 
control maps to
 
MM&A related to
 
properties for which
 
mineral
and/or
 
surface
 
property
 
are
 
controlled
 
by
 
Coronado.
 
While
 
MM&A
 
accepted
 
these
representations
 
as
 
being
 
true
 
and
 
accurate,
 
MM&A
 
has
 
no
 
knowledge
 
of
 
past
 
property
boundary disputes
 
or other
 
concerns, through
 
past knowledge
 
of the
 
Property,
 
that would
signal concern over future mining operations or development potential.
Property
 
control
 
in
 
Appalachia
 
can
 
be
 
intricate.
 
Coal
 
mining
 
properties
 
are
 
typically
composed
 
of
 
numerous
 
property
 
tracts
 
which
 
are
 
owned
 
and/or
 
leased
 
from
 
both
 
land-
holding companies
 
and private
 
individuals or
 
companies.
 
It is
 
common to
 
encounter severed
ownership,
 
with
 
different
 
entities
 
or
 
individuals
 
controlling
 
the
 
surface
 
and
 
mineral
 
rights.
 
Mineral control in
 
the region is
 
typically characterized by
 
leases or ownership
 
of larger tracts
of land, with surface control generally comprised of smaller tracts, particularly in developed
areas.
Legal mining rights
 
may reflect a
 
combination of fee
 
or mineral ownership
 
and fee
 
or mineral
leases of coal lands
 
through various surface and
 
mineral lease agreements.
 
There is also
a relatively small amount
 
of area where
 
the coal is
 
partially owned and/or partially
 
leased on
a limited number of individual tracts.
 
Control of the surface property is necessary to conduct surface mining but is not necessary
to conduct underground
 
mining.
 
Given that
 
the Buchanan Mine
 
has been
 
active dating back
to the
 
1980s, Coronado,
 
and its
 
predecessors, have
 
a successful
 
history of
 
obtaining any
necessary rights and the associated permits to mine.
3.4
 
Encumbrances
No Title
 
Encumbrances are
 
known.
 
By assignment,
 
MM&A did
 
not complete
 
an independent
query related to Title Encumbrances.
 
3.5
 
Other Risks
There is always risk involved in property
 
control.
 
Coronado and its predecessor, CONSOL,
have both had their legal
 
teams examine the deeds and
 
title control in order to
 
minimize the
risk.
 
Historically,
 
property
 
control
 
has
 
not
 
posed
 
any
 
challenges
 
related
 
to
 
Buchanan’s
operations.
 
 
 
ex962p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance
 
with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
13
4
Accessibility, Climate, Local Resources,
Infrastructure and Physiography
4.1
 
Topography,
 
Elevation, and Vegetation
Topography
 
of the
 
area surrounding
 
the Buchanan
 
Mine Complex
 
is typical
 
of the
 
Central
Appalachian Plateau being
 
rugged and deeply
 
dissected by
 
v-shaped river valleys
 
flanked
by
 
steep-sided
 
upland
 
regions.
 
Surface
 
elevations
 
near
 
the
 
mine
 
complex
 
range
 
from
approximately 823
 
meters above
 
sea level
 
in upland
 
regions to
 
approximately 579
 
meters
at
 
stream
 
level.
 
The
 
Property
 
is
 
moderately
 
vegetated,
 
with
 
a
 
mixture
 
of
 
hardwood
 
and
conifer forest
 
in the
 
temperate broadleaf
 
category.
 
The Property
 
is not
 
situated near
 
any
major urban centers, and the surrounding area is considered rural.
4.2
 
Access and Transport
General
 
access
 
to
 
the Buchanan
 
No.
 
1
 
Mine
 
property
 
is
 
via
 
a
 
well-developed
 
network
 
of
primary,
 
secondary,
 
and
 
unimproved
 
roads.
 
Highway
 
460
 
is
 
the
 
primary
 
highway
connecting
 
Pike
 
County
 
in
 
Eastern
 
Kentucky
 
to
 
Buchanan
 
and
 
Tazewell
 
Counties
 
in
Southwestern Virginia.
 
Numerous secondary and unimproved roads provide
 
direct access
to the
 
Property,
 
some being
 
state-
 
and town-maintained.
 
These roads
 
typically stay
 
open
throughout the
 
year.
 
A
Norfolk Southern
 
(
NS
)
 
rail line
 
that is
 
located approximately 6.44
kilometers south-southeast of Oakwood, Virginia, serves as the primary means of transport
for produced coal.
 
NS transports coal from the Buchanan
 
Mine Complex either to domestic
customers or
 
to the
 
Pier 6
 
export terminal
 
at Norfolk,
 
Virginia for
 
overseas shipment.
 
A small
portion of production is transported via
 
truck haul.
 
An extensive network of service roads
 
to
gob gas and coalbed methane (
CBM
) production wells exist on the subject property.
 
4.3
 
Proximity to Population Centers
 
The
 
Buchanan
 
No.
 
1
 
Mine
 
property
 
lies
 
near
 
the
 
town
 
of
 
Grundy
 
in
 
Buchanan
 
County,
Virginia approximately 290 kilometers southeast of
 
Lexington, Kentucky and 153
 
kilometers
southwest of Roanoke, Virginia.
 
As of the 2020 census
 
Buchanan County had a
 
population
of 20,355 residents.
 
4.4
 
Climate and Length of Operating Season
The climate
 
of the
 
region is
 
classified as
 
humid sub-tropical
 
with four
 
distinct seasons:
 
warm
summers, cold winters, and moderate fall and spring
 
seasons.
 
Precipitation in the region is
consistent throughout
 
the year
 
with the
 
most rain
 
falling in
 
spring and
 
the early
 
months of
summer.
 
Average yearly rainfall is 112.62
 
centimeters.
 
Summer months typically begin in
late
 
May
 
and
 
end
 
in
 
early
 
September
 
and
 
range
 
in
 
average
 
temperature
 
from
 
49
 
to
 
84
degrees
 
Fahrenheit (or
 
9.44
 
to 28.89
 
degrees
 
Celsius).
 
Winters
 
typically
 
begin
 
in mid
 
to
late November and
 
run until mid
 
to late March
 
with average temperatures
 
ranging from 26
to
 
56
 
degrees
 
Fahrenheit
 
(or
 
-3.33
 
to 13.33
 
degrees
 
Celsius).
 
Precipitation
 
in
 
the
 
winter
typically
 
comes
 
in
 
the
 
form
 
of
 
snowfall
 
or
 
as
 
a
 
wintery
 
mix
 
(sleet
 
and
 
snow)
 
with
 
severe
snowfall events occurring
 
occasionally.
 
Seasonal variations
 
in climate typically
 
do not
 
affect
 
 
ex962p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
14
underground
 
mining
 
in
 
Virginia.
 
However,
 
weather
 
events
 
could
 
potentially
 
negatively
impact
 
efficiency
 
of
 
surface
 
and
 
preparation
 
plant
 
operations
 
on
 
a
 
very
 
limited
 
basis
 
and
lasting less than a few days.
4.5
 
Infrastructure
The Buchanan No.
 
1 Mine Complex
 
has sources of
 
water,
 
power, personnel,
 
and supplies
readily
 
available
 
for
 
use.
 
Personnel
 
have
 
historically
 
been
 
sourced
 
from the
 
surrounding
communities in Buchanan,
 
Tazewell,
 
McDowell, and Pike counties,
 
and have proven
 
to be
adequate in numbers to operate the mine.
 
As mining is common in the surrounding areas,
the workforce is generally familiar
 
with mining practices, and many are
 
experienced miners.
 
Water is
 
sourced locally from streams
 
that flow over Coronado-owned
 
property.
 
The mine
also
 
utilizes
 
ground
 
water
 
from
 
an
 
old
 
abandoned
 
mine.
 
Electricity
 
is
 
sourced
 
from
American Electric Power
 
(
AEP
)
.
 
The service industry
 
in the areas
 
surrounding the mine
complex
 
has
 
historically
 
provided
 
supplies,
 
equipment
 
repairs
 
and
 
fabrication,
 
etc.
 
The
Coronado-owned
 
Buchanan
 
Preparation
 
Plant
 
services
 
the
 
mine
 
via
 
a
 
skip
 
hoist
 
and
conveyor
 
belt system
 
which
 
transports extracted
 
coal from
 
an underground
 
bunker to
 
the
surface facility.
 
The NS rail line serves as the main means of transport from the mine.
5
History
5.1
 
Previous Operation
The Property was formerly controlled by
Consolidation Coal Company (
CONSOL
)
.
 
Mine
development
 
was
 
started
 
by
 
CONSOL
 
in
 
1983
 
and
 
longwall
 
production
 
began
 
in
 
1987.
 
Coronado acquired the Buchanan Mine from CONSOL in March 2016.
The most productive of any 4-year period since 1987 has
 
occurred since the acquisition by
Coronado.
 
Production history
 
has been
 
approximately 3.5
 
Mt in
 
2016 (in
 
only a
 
9-month
period), 4.9 Mt in 2017, 4.7 Mt in 2018, 4.5 Mt in 2019, 3.4 Mt in 2020 and 4.4 Mt in 2021.
5.2
 
Previous Exploration
The
 
Property
 
has
 
been
 
extensively
 
explored
 
by
 
subsurface
 
drilling
 
efforts
 
carried
 
out
 
by
numerous
 
entities,
 
most
 
of
 
which
 
were
 
completed
 
prior
 
to
 
acquisition
 
by
 
Coronado.
 
The
majority of
 
the drilling
 
was accomplished
 
using vertical
 
continuous (diamond)
 
coring or
 
air
rotary methods.
Drill
 
records
 
indicate
 
that
 
independent
 
contract
 
drilling
 
operators
 
have
 
typically
 
been
engaged
 
to
 
carry
 
out
 
drilling
 
on
 
the
 
Property.
 
Geophysical
 
logging
 
on
 
those
 
properties
acquired from CONSOL was often
 
performed by both CONSOL’s in-house logging services
and
 
outside
 
logging
 
firms.
 
MM&A,
 
via
 
its
 
Geophysical
 
Logging
 
Systems
 
subsidiary,
 
has
logged
 
a
 
significant
 
number
 
of
 
the
 
past
 
exploration
 
holes
 
and
 
degas
 
wells,
 
and
 
currently
logs most of the recently drilled holes.
 
 
ex962p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
15
6
Geological Setting, Mineralization and Deposit
6.1
 
Regional, Local and Property Geology
The
 
Property
 
lies
 
in
 
the
 
Central
 
Appalachian
 
Coal
 
basin
 
in
 
the
 
Appalachian
 
Plateau
physiographic province.
 
The
 
coal
 
deposits
 
in
 
the
 
eastern
 
US
 
are
 
the oldest
 
and
 
most
 
extensively
 
developed
 
coal
deposits in the country.
 
The coal deposits on the Property are Carboniferous in age, being
of the
 
Pennsylvanian system.
 
Overall, these
 
Carboniferous coals
 
contain two-fifths
 
of the
US’s bituminous coal deposits and extend over
 
1,448 kilometers from northern Alabama to
Pennsylvania and
 
are part
 
of what
 
is known
 
as the
Appalachian Basin
.
 
The Appalachian
Basin is more than 402
 
kilometers wide and, in
 
some portions, contains over
 
60 coal seams
of varying economic significance.
Seams
 
of economic
 
significance typically
 
range
 
between 0.30
 
meters
 
and
 
1.83 meters
 
in
thickness,
 
with
 
relatively
 
little
 
structural
 
deformation.
 
Regional
 
structure
 
is
 
typically
characterized by gently dipping strata to the northwest at less than one percent.
Seams of
 
the Pocahontas
 
Formation have
 
historically been
 
mined in
 
the Buchanan
 
No. 1
Mine with the Pocahontas No. 3 seam being the principal
 
seam in the formation.
 
Coal from
the area has historically sold in primarily metallurgical markets.
6.2
 
Mineralization
The
 
generalized
 
stratigraphic
 
columnar
 
section
 
in
Figure
 
6-1
 
demonstrates
 
the
 
vertical
relationship of the principal coal seams and rock formations on the Property.
 
 
ex962p2i0.jpg ex962p25i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
16
Figure 6-1:
 
Buchanan Stratigraphic Column
(not to scale)
6.3
 
Deposits
The
 
coal
 
produced
 
at
 
Buchanan
 
No.
 
1
 
is
 
typically
 
low
 
volatile
 
(<23%
 
volatile
 
matter)
bituminous
 
coal.
 
Due to
 
the
 
value of
 
the Pocahontas
 
No. 3
 
(
P3
) as
 
a
 
low-volatile
 
coking
coal, it has
 
been extensively mined
 
in the region.
 
Multiple seams make
 
up the P3
 
horizon
in the projections
 
for the Property.
 
The P31, P32,
 
P33, and 345,
 
all individual splits
 
of the
P3 horizon,
 
are present
 
on the
 
Property and
 
the projected
 
areas.
 
The mineable
 
bench in
the P3 horizon consists
 
of various configurations of
 
the seams, depending
 
on thickness and
relative location, as seam splitting does occur in various parts of the Property.
 
The various
bench configurations are: 1)
 
full-seam bench (P31, P32,
 
P33, and 345), also known
 
as the
P3
 
bench;
 
2)
 
P31,
 
P32,
 
P33
 
bench;
 
and
 
3)
 
P32,
 
P33,
 
and
 
345
 
benches.
 
The
 
full-seam
bench (P3) thickness ranges
 
from 1.22 to 3.44 meters
 
with an average of 1.86
 
meters, the
P31, P32,
 
P33 bench
 
thickness
 
ranges from
 
1.22 to
 
2.10 meters
 
with an
 
average of
 
1.43
 
 
ex962p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
17
meters,
 
and the
 
P32, P33,
 
345 bench
 
thickness
 
ranges from
 
1.22 to
 
2.71 meters
 
with an
average of 1.65 meters.
 
The seam is situated below drainage throughout the Property and
is accessible
 
by existing
 
mine shafts.
 
Floor and
 
roof strata
 
vary throughout
 
the projected
mine area with floor strata including fireclay, claystone, shale, sandy shale, and sandstone,
but primarily being fireclay and shale.
 
Roof strata varies throughout as well but primarily is
composed of sandstone, sandy shale, and shale.
 
7
Exploration
7.1
 
Nature and Extent of Exploration
Extensive
 
exploration
 
in
 
the
 
form
 
of
 
subsurface
 
drill
 
efforts
 
has
 
been
 
carried
 
out
 
on
 
the
Property by numerous entities, most
 
of which efforts were completed
 
prior to the acquisition
by
 
Coronado.
 
Diamond
 
core,
 
rotary,
 
and
 
CBM
 
drilling
 
are
 
the
 
three
 
primary
 
types
 
of
exploration
 
on
 
the
 
Property.
 
Data
 
for
 
correlation
 
and
 
mining
 
conditions
 
are
 
derived
 
from
core
 
descriptions
 
and
 
geophysical
 
logging
 
(e-logging).
 
Coal
 
quality
 
analyses
 
were
 
also
employed during the core exploration process.
 
A total of 4,535 core, rotary, and CBM wells
have been
 
drilled for
 
exploration and
 
CBM purposes.
 
The location of
 
the drilling
 
is shown
on the maps included in
Appendix B
.
The
 
concentration
 
of
 
exploration
 
varies
 
slightly
 
across
 
the
 
Property,
 
with
 
the
 
proposed
underground
 
mining
 
areas
 
having
 
the
 
highest
 
concentration
 
of
 
drill holes.
 
Drilling
 
on
 
the
Property
 
is
 
typically
 
sufficient
 
for
 
delineation
 
of
 
potential
 
underground
 
mineable
 
benches.
 
Core logging
 
is carried
 
out by
 
professional geologists
 
in cases
 
where roof
 
and floor
 
strata
are
 
of
 
particular
 
interest
 
and
 
in
 
cases
 
where
 
greater
 
resolution
 
and
 
geologic
 
detail
 
are
needed.
 
However, most
 
drill hole data
 
come from simplified driller’s
 
logs, which often
 
lack
specific details regarding geotechnical conditions and specific geology, making correlations
and
 
floor
 
and
 
roof
 
conditions
 
difficult
 
to
 
determine.
 
Geophysical
 
logging
 
(e-logging)
techniques,
 
by
 
contrast,
 
document
 
specific
 
details
 
useful
 
for
 
geologic
 
interpretation
 
and
mining
 
conditions.
 
Given
 
the
 
variability
 
of
 
data-gathering
 
methods,
definitive
 
mapping
 
of
future mining conditions
 
may not
 
be possible,
 
but projections and
 
assumptions can be
 
made
within a
reasonable
 
degree of certainty.
A
 
significant
 
effort
 
was
 
put
 
into
 
verifying
 
the
 
integrity
 
of
 
the
 
database.
 
Once
 
this
 
was
established, stratigraphic columnar sections were generated using cross-sectional analysis
to establish or confirm coal seam correlations.
 
A typical cross-section is shown in
Figure 7-
1
.
 
 
ex962p27i0.jpg ex962p27i1.jpg
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
18
Figure 7-1: Generalized Buchanan Cross-Section
Due to
 
the long
 
history of
 
exploration by
 
various parties
 
on the
 
Property,
 
a wide
 
variety of
survey
 
techniques
 
exist
 
for
 
documentation
 
of
 
data
 
point
 
locations.
 
Many
 
of
 
the
 
older
exploration drill holes appear to have been located by survey and more recently completed
drill
 
holes
 
are
 
often
 
located
 
by
 
high-resolution
 
Global
 
Positioning
 
System
 
(
GPS
)
 
units.
 
However, some holes appear to have been approximately located using USGS topography
maps
 
or
 
other
 
methods
 
which
 
are
 
less
 
accurate.
 
Therefore,
 
discretion
 
had
 
to
 
be
 
used
regarding the accuracy for the location
 
and ground surface elevation of some
 
of these older
drill
 
holes.
 
In
 
instances
 
where
 
a
 
drill
 
hole
 
location
 
(or
 
associated
 
coal
 
seam
 
elevations)
appeared
 
to
 
be
 
inconsistent
 
with
 
the
 
overall
 
structural
 
trend
 
(or
 
surface
 
topography
 
for
surface-mineable areas),
 
the data
 
point was
 
not honored
 
for geological
 
modeling.
 
Others
with apparently minor variances were adjusted and then used by MM&A.
 
Surveying
 
of the
 
underground and
 
surface mined
 
areas
 
has been
 
performed by
 
the mine
operators
 
and/or
 
their
 
consulting
 
surveyors.
 
By
 
assignment,
 
MM&A
 
did
 
not
 
verify
 
the
accuracy or completeness
 
of supplied
 
mine maps
 
but accepted
 
this information as
 
being the
work of responsible engineers and surveyors.
MM&A compiled comprehensive
 
topographic map files
 
by selecting the
 
best available aerial
mapping for each area and filling any gaps with digital USGS topographic mapping.
 
 
ex962p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
19
7.2
 
Non-Drilling Procedures and Parameters
Some analyses, specifically ultimate
 
ash and sulfur types
 
are not as prevalent
 
as others in
the testing
 
done on
 
samples recovered
 
by drilling.
 
To supplement the information database,
samples
 
have
 
been
 
collected
 
from
 
mine
 
stockpiles
 
and
 
either
 
truck
 
or
 
train
 
shipment
samples.
7.3
 
Drilling Procedures
Core
 
drilling
 
methods
 
utilize
 
NX-size
 
(5.4
 
centimeters)
 
or
 
similar-sized
 
core
 
cylinders
 
to
recover core samples, which can be used to
 
delineate geologic characteristics, and for coal
quality
 
testing
 
and
 
geotechnical
 
logging.
 
For
 
the
 
core
 
holes,
 
the
 
geophysical
 
logs
 
are
especially useful in verifying the core recovery of both the coal samples (for assurance that
a
 
sample
 
is
 
representative
 
of
 
the
 
full
 
seam)
 
and
 
of
 
the
 
roof
 
and
 
floor
 
rock
 
samples
 
(for
evaluating ground control
 
characteristics of deep
 
mineable coal seams).
 
In addition to
 
the
core holes, rotary drilled holes also exist on most of
 
the Property.
 
Data for the rotary drilled
holes are mainly derived
 
from downhole geophysical
 
logs, which are used
 
to interpret coal
and rock thickness and
 
depth since logging of the
 
drill cuttings is not reliable.
 
Additionally,
there is an ongoing active surface drilling program
 
for degassing the mined seam ahead of
mining.
 
The degas
 
holes are
 
typically logged
 
geophysically,
 
and the
 
resulting interpreted
data
 
are
 
incorporated
 
into
 
the
 
geological
 
model.
 
Exploratory
 
drilling
 
generally
 
requires
drilling to depths of over 305 meters to penetrate the target coal seam at Buchanan.
A wide variety
 
of core-logging techniques
 
exist for the
 
Property.
 
For many of
 
the core holes,
the
 
primary
 
data
 
source
 
is
 
a
 
generalized
 
lithology
 
description
 
by
 
the
 
driller,
 
typically
supplemented
 
by
 
a
 
more
 
detailed
 
core
 
log
 
completed
 
by
 
a
 
geologist.
 
These
 
drilling
 
logs
were provided to
 
MM&A as a
 
geological database.
 
MM&A geologists were not
 
involved in
the production
 
of original
 
core logs
 
but did perform
 
a basic
 
check of
 
information within
 
the
provided database.
 
Where geophysical
 
logs for
 
such holes
 
are available,
 
they were
 
used
by MM&A geologists to verify the coal thickness and core recovery of seams.
 
7.4
 
Hydrology
Buchanan is an
 
active mine with
 
no hydrologic concerns
 
or material issues
 
experienced in
its history.
 
Future mining
 
is projected
 
to occur
 
in areas
 
exhibiting similar
 
hydrogeological
conditions
 
as
 
past
 
mining,
 
including
 
stream
 
undermining,
 
undermining
 
of
 
aquifers,
 
and
mining
 
through
 
hydraulically
 
fractured
 
(frac’d)
 
coalbed
 
methane
 
wells.
 
Based
 
upon
 
the
successful
 
history
 
of
 
the
 
operation
 
with
 
regards
 
to
 
hydrogeological
 
features,
 
MM&A
assumes that the operation will not be hindered by such issues in the future.
7.5
 
Geotechnical Data
Mining plans
 
for potential
 
underground mines
 
were developed
 
by Coronado
 
and modified
by MM&A to
 
fit current property
 
constraints.
 
Pillar stability was
 
tested by MM&A
 
using the
Analysis of Retreat Mining Pillar Stability
 
(ARMPS
) and
Analysis of Longwall Pillar Stability
(ALPS)
 
programs that were developed
 
by the
National Institute for Occupational
 
Safety
 
 
ex962p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
20
and Health (
NIOSH
)
.
 
MM&A reviewed the
 
results from the
 
ARMPS and ALPS
 
analysis and
considered them in the development of the LOM plan.
8
Sample Preparation,
 
Analyses and Security
8.1
 
Prior to Sending to the Lab
Most of the
 
coal samples have been
 
obtained from the
 
Property by subsurface exploration
using core
 
drilling techniques.
 
The protocol
 
for preparing
 
and testing
 
the samples
 
has varied
over
 
time and
 
is not
 
well documented
 
for the
 
older holes
 
drilled
 
on the
 
Property.
 
Typical
core-drilling
 
sampling
 
methods
 
for
 
coal
 
in
 
the
 
United
 
States
 
involves
 
drilling
 
through
 
the
seam, removing the core from the barrel, describing the lithology, wrapping the sample in a
sealed
 
plastic
 
sleeve
 
and
 
placing
 
it
 
lengthwise
 
into
 
a
 
covered
 
core
 
box,
 
and
 
carefully
marking hole ID
 
and depth intervals
 
on each box
 
and lid, allowing
 
the core to
 
be delivered
to a
 
laboratory in
 
correct stratigraphic
 
order, and with
 
original moisture
 
content.
 
This process
has been the norm for both historical and ongoing exploration activities at the Property.
This work is typically performed by the
 
supervising driller, geologist, or company personnel.
 
Samples are most often delivered
 
to the company by the
 
driller after each shift or
 
acquired
by company personnel or representatives.
 
Most of the coal core
 
samples were obtained by
previous or
 
current operators
 
on the
 
Property.
 
MM&A did
 
not participate
 
in the
 
collection,
sampling, and analysis
 
of the core
 
samples.
 
However, it is reasonable
 
to assume, given
 
the
consistency of quality from previous operators,
 
that these samples were generally collected
and
 
processed
 
under
 
industry
 
best
 
practices.
 
This
 
assumption
 
is
 
based
 
on
 
MM&A’s
familiarity with the operating companies and the companies used to perform the analyses.
8.2
 
Lab Procedures
Coal-quality
 
testing
 
has
 
been
 
performed
 
over
 
many
 
years
 
by
 
operating
 
companies
 
using
different laboratories
 
and testing
 
regimens.
 
Some of
 
the samples
 
have raw
 
analyses and
washabilities on the full seam (with coal and rock parting layers co-mingled)
 
and are mainly
useful for characterizing the coal quality for projected production from underground mining.
 
Other
 
samples
 
have
 
coal
 
and
 
rock
 
analyzed
 
separately,
 
the
 
results
 
of
 
which
 
can
 
be
manipulated to forecast
 
underground mining quality.
 
Care has
 
been taken
 
to use only
 
those
analyses that
 
are representative
 
of the
 
coal quality
 
parameters for
 
the appropriate
 
mining
type for each sample.
 
Unlike many Appalachian
 
properties, Buchanan only has
 
interest in
one deep seam; therefore, the analyses have been done following a consistent protocol.
Standard procedure upon receipt
 
of core samples
 
by the testing laboratory
 
is to: 1) log
 
the
depth and thickness of the sample; then 2) perform testing as specified by a representative
of the
 
operating company.
 
Each sample
 
is then
 
analyzed in
 
accordance with
 
procedures
defined under
American Society for Testing
 
and Materials (
ASTM
)
 
standards including,
but
 
not
 
limited
 
to
 
washability
 
(ASTM
 
D4371);
 
ash
 
(ASTM
 
D3174);
 
sulfur
 
(ASTM
 
D4239);
Btu/lb. (ASTM
 
D5865); volatile
 
matter (ASTM
 
D3175); Free
 
Swell Index
 
(
FSI
) (ASTM
 
D720).
 
 
ex962p2i0.jpg
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
21
9
Data Verification
9.1
 
Procedures of Qualified Person
MM&A
 
reviewed
 
the
 
digital
 
geologic
 
database
 
supplied
 
by
 
Coronado.
 
The
 
database
consists
 
of
 
data
 
records,
 
which
 
include
 
drill
 
hole
 
information
 
for
 
holes
 
that
 
lie
 
within
 
and
adjacent
 
to
 
the
 
Property
 
and
 
records
 
for
 
numerous
 
supplemental
 
coal
 
seam
 
thickness
measurements.
 
Upon completion
 
of
 
the database
 
verification,
 
copies of
 
each
 
entry were
printed,
 
and
 
cross
 
referenced
 
to
 
the
 
original
 
document
 
for
 
verification.
 
Once
 
the
 
initial
integrity of
 
the database
 
was established,
 
stratigraphic columnar
 
sections were
 
generated
using cross-sectional analysis to establish
 
or confirm coal-seam correlations.
 
Geophysical
logs were used wherever available to assist in
 
confirming the seam correlation and to verify
proper seam thickness measurements and recovery of coal samples.
 
After
 
establishing
 
and/or
 
verifying
 
proper
 
seam
 
correlation,
 
seam
 
data-control
 
maps
 
and
geological cross-sections
 
were generated
 
and again
 
used to
 
verify seam
 
correlations and
data integrity.
 
Once the
 
database was
 
fully vetted,
 
seam thickness,
 
base-of-seam elevation,
roof and floor lithology,
 
and overburden maps were independently
 
generated for use in the
mine planning process.
9.2
 
Limitations
As with
 
any exploration
 
program, localized
 
anomalies cannot
 
always be
 
discovered.
 
The
greater
 
the density
 
of the
 
samples taken,
 
the less
 
the risk.
 
Once an
 
area
 
is identified
 
as
being of interest for inclusion in the mine
 
plan, additional samples are taken to help reduce
the risk in
 
those specific areas.
 
In general, provision
 
is made in
 
the mine planning
 
portion
of the
 
study to allow
 
for localized
 
anomalies that
 
are typically classed
 
more as
 
a nuisance
than a hinderance.
 
Longwall production has been de-rated in thinner coal zones.
9.3
 
Opinion of Qualified Person
Sufficient data have been obtained
 
through various exploration and
 
sampling programs and
mining operations to support the geological interpretations of seam structure and thickness
for coal horizons situated on the Property.
 
The data are of sufficient quantity and
 
reliability
to reasonably support the coal resource and coal reserve estimates in this TRS.
10
Mineral Processing and Metallurgical Testing
10.1
 
Testing Procedures
Separate
 
tabulations
 
have
 
been
 
compiled
 
for
 
basic
 
chemical
 
analyses
 
(both
 
raw
 
and
washed quality),
 
petrographic data,
 
rheological data
 
and chlorine,
 
ash, ultimate
 
and sulfur
analysis.
 
The latter
 
two data
 
types are
 
not as
 
prevalent and
 
have been
 
supplemented by
samples collected from mine stockpiles and either truck- or train-shipment samples.
 
 
ex962p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
22
Available
 
coal-quality
 
data
 
were
 
tabulated
 
by
 
resource
 
area
 
in
 
a
 
Microsoft®
 
EXCEL
workbook and the details of that work are maintained on file at
 
the offices of Coronado and
MM&A.
 
These tables
 
also provide
 
basic statistical
 
analyses of
 
the coal
 
quality data
 
sets,
including
 
average
 
value;
 
maximum
 
and
 
minimum
 
values;
 
and
 
the
 
number
 
of
 
samples
available to represent
 
each quality parameter
 
of the seam.
 
Coal samples
 
that were deemed
by
 
MM&A
 
geologists
 
to
 
be
 
unrepresentative
 
were
 
not
 
used
 
for
 
statistical
 
analysis
 
of
 
coal
quality, as documented in the tabulations.
 
A representative group of
 
drill hole samples from
the Property
 
were then
 
checked against
 
the original
 
drill laboratory
 
reports to
 
verify accuracy
and correctness.
The amount
 
and areal
 
extent of
 
coal sampling
 
for geological
 
data is
 
generally sufficient
 
to
represent
 
the
 
quality
 
characteristics
 
of
 
the
 
coal
 
horizons
 
and
 
allow
 
for
 
proper
 
market
placement of the subject coal seams.
 
For some of the coal deposits
 
there are considerable
laboratory data from
 
core samples that are
 
representative of the
 
full extent of the
 
resource
area;
 
and
 
for
 
others
 
there
 
are
 
more
 
limited
 
data
 
to
 
represent
 
the
 
resource
 
area.
 
For
example, in
 
the active
 
operations with
 
considerable previous
 
mining, there
 
may be
 
limited
quality data within some of the remaining resource areas; however, in those cases the core
sampling data can be supplemented with
 
operational data from mining and shipped quality
samples representative of the resource area.
10.2
 
Relationship of Tests to the Whole
The extensive sampling and testing procedures typically followed in the coal industry result
in an excellent correlation between samples and marketable product.
 
Shipped analyses of
the
 
coal
 
from
 
Buchanan
 
were
 
reviewed
 
to
 
verify
 
that
 
the
 
coal
 
quality
 
and
 
characteristics
were as
 
expected.
 
Buchanan has
 
a long
 
history of
 
saleable production
 
in the
 
low-volatile
metallurgical
 
markets,
 
confirming
 
exploration
 
results.
 
Degradation
 
of
 
coking
 
coal
characteristics over time is not anticipated to be an issue.
10.3
 
Lab Information
Each sample is
 
analyzed at area
 
Laboratories that operate
 
in accordance with
 
procedures
defined under ASTM standards including, but not limited to washability
 
(ASTM D4371); ash
(ASTM
 
D3174);
 
sulfur
 
(ASTM
 
D4239);
 
Btu/lb.
 
(ASTM
 
D5865);
 
volatile
 
matter
 
(ASTM
D3175); Free Swell Index (
FSI
) (ASTM D720).
10.4
 
Relevant Results
No critical factors have been found
 
that would adversely affect the recovery
 
of the Reserve.
 
Any quality
 
issues that occur,
 
either localized or
 
generally are
 
accounted for
 
in the
 
Market
Study done for this TRS.
11
Mineral Resource Estimates
MM&A independently created
 
a geologic model
 
to define the
 
coal resources at
 
Buchanan.
 
Coal resources were estimated as of December 31, 2021.
 
 
ex962p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
23
11.1
 
Assumptions, Parameters and Methodology
Geological
 
data
 
were
 
imported
 
into
 
Carlson
 
Mining
®
 
(formerly
 
SurvCADD
®
)
 
geological
modelling software in the form of Microsoft
®
 
Excel files incorporating drill hole collars, seam
and thickness picks, bottom seam
 
elevations and raw and washed
 
coal quality.
 
These data
files were
 
validated prior
 
to importing
 
into the
 
software.
 
Once imported,
 
a geologic
 
model
was created, reviewed and verified with a key element being a gridded model of coal seam
thickness.
 
Resource
 
tonnes
 
were
 
estimated
 
by
 
using
 
the
 
seam
 
thickness
 
grid
 
based
 
on
each valid point of observation and by defining resource confidence arcs
 
around the points
of
 
observation.
 
Points
 
of
 
observation
 
for
 
Measured
 
and
 
Indicated
 
confidence
 
arcs
 
were
defined for
 
all valid drill
 
holes that intersected
 
the seam
 
using standards deemed
 
acceptable
by MM&A based on a detailed geologic evaluation and a statistical analysis of all drill holes
within the
 
projected reserve
 
areas as
 
described in
Section 11.1.1
.
 
The geological
 
evaluation
incorporated an analysis
 
of seam thickness
 
related to depositional
 
environments, adjacent
roof and floor lithologies, and structural influences.
After
 
validating coal
 
seam data
 
and
 
establishing correlations,
 
the thickness
 
and
 
elevation
for seams of
 
economic interest were
 
used to generate
 
a geologic model.
 
Due to the
 
relative
structural simplicity
 
of the
 
deposits and
 
the reasonable
 
continuity of
 
the tabular
 
coal beds,
the principal geological interpretation necessary to define the geometry
 
of the coal deposits
is the proper
 
modeling of their
 
thickness and elevation.
 
Both coal thickness
 
and quality data
are
 
deemed
 
by
 
MM&A
 
to
 
be
 
reasonably
 
sufficient
 
within
 
the
 
resource
 
areas.
 
Therefore,
there
 
is
 
a
 
reasonable
 
level
 
of
 
confidence
 
in
 
the
 
geologic
 
interpretations
 
required
 
for
 
coal
resource determination based on the available data and the techniques
 
applied to the data.
Table 11
 
-1
 
below provides
 
the geological
 
mapping and
 
coal tonnage
 
estimation criteria
 
used
for
 
the
 
coal
 
resource
 
and
 
reserve
 
evaluation.
 
These
 
cut-off
 
parameters
 
have
 
been
developed by MM&A based on its experience
 
with the Coronado property and are typical of
mining operations
 
in the
 
Central Appalachian
 
coal basin.
 
This experience
 
includes technical
and
 
economic
 
evaluations
 
of
 
numerous
 
properties
 
in
 
the
 
region
 
for
 
the
 
purposes
 
of
determining the economic viability of the subject coal reserves.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
24
Table 11
 
-1:
 
General Reserve and Resource Criteria
Item
Parameters
Technical Notes & Exceptions*
•
 
General Reserve Criteria
 
 
Reserve Classification
Reserve and Resource
Reliability Categories
Reserve (Proven and Probable)
Resource (Measured, Indicated and Inferred)
To better reflect geological conditions of the coal
deposits, distance between points of observation is
standard USGS (in meters), respectively, for
measured and indicated and inferred.
Effective Date of Resource
Estimate
December 31, 2021
Coal resources were updated for depletion based
 
on
information from Coronado.
 
Effective date for coal
resources is as of December 31, 2021.
Effective Date of Reserve Estimate
December 31, 2021
Coal reserves were updated for depletion based
 
on
information from Coronado.
 
Effective date for coal
reserves is as of December 31, 2021.
Seam Density
Variable, dependent upon seam
characteristics (based on available drill hole
quality).
 
In the absence of laboratory data,
estimated by (1) assuming specific gravity of
1.30 for coal and 2.25 to 2.5 for rock parting,
or (2) 1280 kg/m
3
 
to 1324 kg/m
3
 
for a "clean"
seam
•
 
Underground-Mineable Criteria
Map Thickness
Total seam thickness
Minimum Seam Thickness
1.2 meters (locally <1.2 m for limited areas
integral to the mine plan)
Minimum Mining Thickness
1.83 meters
Minimum In-Seam Wash Recovery
40 percent
 
Wash Recovery Applied to Coal
Reserves
Based on average yield for drill holes within
reserve area, or in the absence of laboratory
washability data, based on estimated visual
recovery using specific gravities noted above
and 95 percent yield on "clean" coal
Out-of-Seam Dilution Thickness for
Run-of-Mine Tonnes Applied to
Coal Reserves
0.05 meters
2243 kg/m³ density used for dilution tonnage
estimate
Mine Barrier
61-meter distance from abandoned mines and
sealed or pillared areas.
Adjustments Applied to Coal
Reserves
6 percent moisture increase; 5 percent
preparation plant inefficiency
Note:
 
Exceptions for application of these criteria
 
to resource and reserve estimation are
 
made as warranted and demonstrated by
 
either actual
mining experience or detailed data that
 
allows for empirical evaluation of mining conditions.
 
Final classification of coal reserve is made
based on the pre-feasibility evaluation.
11.1.1
 
Geostatistical Analysis for Classification
MM&A
 
completed
 
a
 
geostatistical
 
analysis
 
on
 
drill
 
holes
 
within
 
the reserve
 
boundaries
 
to
determine the applicability of the common United
 
States classification system for measured
and indicated and inferred coal
 
resources.
 
Historically, the United States has assumed that
coal within
 
0.4 kilometers
 
of a
 
point of
 
observation represents
 
a measured
 
resource whereas
coal between
 
0.4 kilometer
 
and 1.2
 
kilometers from
 
a point
 
of observation
 
is classified
 
as
indicated.
 
Inferred resources are commonly
 
assumed to be located
 
between 1.2 kilometers
and 4.8
 
kilometers from
 
a point
 
of observation.
 
Per SEC
 
regulations, only
 
measured and
indicated
 
resources
 
may
 
be
 
considered
 
for
 
reserve
 
classification,
 
respectively
 
as
 
proven
and probable reserves.
MM&A
 
performed
 
a
 
geostatistical
 
analysis
 
of
 
the
 
Buchanan
 
data
 
set
 
using
 
the
 
Drill
 
Hole
Spacing
 
Analysis
 
(
DHSA
)
 
method.
 
This
 
method
 
attempts
 
to
 
quantify
 
the
 
uncertainty
 
of
applying
 
a
 
measurement
 
from
 
a
 
central
 
location
 
to
 
increasingly
 
larger
 
square
 
blocks
 
and
provides recommendations for determining the distances between drill holes for measured,
indicated, and inferred resources.
 
 
ex962p2i0.jpg ex962p34i2.jpg ex962p34i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
25
To
 
perform
 
DHSA
 
the
 
data
 
set
 
was
 
processed
 
to
 
remove
 
any
 
erroneous
 
data
 
points,
clustered data
 
points, as
 
well as
 
directional trends.
 
This was
 
achieved through
 
the use of
histograms,
 
as
 
seen
 
in
Figure
 
11-1
,
 
color
 
coded
 
scatter
 
plots
 
showing
 
the
 
geospatial
positioning of the borings,
Figure 11-2
, and trend analysis.
Figure 11-1:
 
Histogram of the Total Seam
Thickness for the Pocahontas No. 3 Seam
Present in the Buchanan Mine Complex
Figure 11-2:
 
Scatter plot of the Total
Seam Thickness for the Pocahontas
No. 3 Seam Present in the Buchanan
Mine Complex
Following the
 
completion of
 
data processing,
 
a variogram
 
of the
 
data set
 
was created,
Figure
11
-3
.
 
The
 
variogram
 
plots
 
average
 
square
 
difference
 
against
 
the
 
separation
 
distance
between the data pairs.
 
The separation distance is broken
 
up into separate bins defined
 
by
a
 
uniform
 
lag
 
distance
 
(e.g.,
 
for
 
a
 
lag
 
distance
 
of
 
152
 
meters
 
the
 
bins
 
would
 
be
 
0
 
–
 
152
meters, 153 –
 
305 meters, etc.).
 
Each pair of
 
data points that
 
are less than
 
one lag distance
apart are reported
 
in the first bin.
 
If the data pair
 
is further apart
 
than one lag distance
 
but
less
 
than
 
two
 
lag
 
distances
 
apart,
 
then
 
the
 
variance
 
is
 
reported
 
in
 
the
 
second
 
bin.
 
The
numerical
 
average
 
for
 
differences
 
reported
 
for each
 
bin
 
is
 
then
 
plotted
 
on
 
the
 
variogram.
 
Care was taken to define the lag distance in such a way as to not
 
overestimate any nugget
effect
 
present
 
in
 
the
 
data
 
set.
 
Lastly,
 
modeled
 
equations,
 
often
 
spherical,
 
gaussian,
 
or
exponential,
 
are
 
applied
 
to
 
the
 
variogram
 
in
 
order
 
to
 
represent
 
the
 
data
 
set
 
across
 
a
continuous spectrum.
 
 
ex962p2i0.jpg ex962p35i1.jpg
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
26
Figure 11-3: Variogram of the Total
 
Seam Thickness for the Pocahontas No. 3 Seam
 
Present in the Buchanan Mine Complex
The estimation
 
variance is
 
then calculated
 
using information
 
from the
 
modeled
 
variogram
as
 
well
 
as
 
charts
 
published
 
by
 
Journel
 
and
 
Huijbregts
 
(1978).
 
This
 
value
 
estimates
 
the
variance from
 
applying a single
 
central measurement to
 
increasingly larger square
 
blocks.
 
Care was
 
taken to
 
ensure any
 
nugget effect
 
present
 
was added
 
back into
 
the data.
 
This
process was repeated for each test block size.
The final step of the process is to calculate the global estimation
 
variance.
 
In this step, the
number of square blocks
 
that would fit inside
 
the selected study area
 
is determined for each
block size
 
that was
 
investigated in
 
the previous
 
step.
 
The estimation
 
variance is
 
then divided
by
 
the
 
number
 
of
 
blocks
 
that
 
would
 
fit
 
inside
 
the
 
study
 
area
 
for
 
each
 
test
 
block
 
size.
 
Following
 
this
 
determination,
 
the
 
data
 
is
 
then
 
transformed
 
back
 
to
 
represent
 
the
 
relative
error in the 95th-percentile range.
Figure 11
 
-4
shows the results of the DHSA performed on the Pocahontas No. 3 seam data
for the Buchanan Mine.
 
DHSA provides hole to hole spacing values; these distances need
to be converted
 
to radius from
 
a central point
 
in order to
 
compare to the
 
historical standards.
 
A
 
summary
 
of
 
the
 
radius
 
data
 
is shown
 
in
Table
 
11-2
.
 
DHSA
 
prescribes
 
that
 
measured,
indicated, and
 
inferred drill hole
 
spacing be determined
 
at the 10-percent,
 
20-percent, and
50-percent levels of relative error, respectively.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex962p36i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
27
Figure 11-4: Result of DHSA for the Pocahontas No. 3 Seam Present in the Buchanan Mine
Complex
Table 11
 
-2:
 
DHSA Results Summary for Radius from a Central
 
Point
Model:
Measured Radial Distance
(10% Relative Error)
Indicated Radial
Distance
(20% Relative Error)
Inferred Radial
Distance
(50% Relative Error)
(km)
(km)
(km)
Gaussian:
0.71
1.10
2.76
Spherical:
0.71
1.08
2.67
Exponential:
0.67
1.08
3.08
Comparing the results
 
of the DHSA
 
to the historical
 
standards, it is
 
evident that the
 
historical
standards
 
are
 
more
 
conservative
 
than
 
even
 
the
 
most
 
conservative
 
DHSA
 
model
 
with
regards to determining measured resources.
 
The Exponential model recommends using a
radius
 
of
 
0.67
 
kilometers
 
for
 
measured
 
resources compared
 
to
 
the historical
 
value
 
of
 
0.4
kilometers.
 
With
 
respect
 
to
 
indicated
 
resources,
 
the
 
DHSA
 
falls
 
in
 
line
 
closely
 
with
 
the
historical standards.
 
The Exponential
 
and Spherical
 
models recommend
 
using a
 
radius 1.08
kilometers,
 
while
 
the
 
Gaussian
 
model
 
recommends
 
a
 
radius
 
of
 
1.10
 
kilometers.
 
These
values line up closely
 
with the historical radius
 
of 1.2 kilometers.
 
These results have
 
led the
QPs to
 
report the
 
data following
 
the historical
 
classification standards,
 
rather than
 
use the
results of the DHSA.
11.2
 
Qualified Person’s Estimates
Mineral resources, representing
 
in-situ coal in
 
which a portion
 
of reserves are
 
derived, are
presented
 
below.
 
Based
 
on
 
the
 
work
 
described
 
and
 
detailed
 
modelling
 
of
 
the
 
areas
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
28
considering all the parameters defined, a
 
coal resource estimate, summarized in
Table
 
11-
3
, was prepared as of December 31, 2021, for property controlled by Coronado.
Table 11
 
-3:
 
Coal Resources Summary as of December 31, 2021
 
Coal Resource (Dry Tonnes, In Situ, Mt)
Resource Quality (Dry)
Area
Measured
Indicated
Inferred
Total
Ash%
Sulfur%
VM%
Inclusive of Reserves
157.0
19.0
0.0
176.1
25
0.7
16
Exclusive of Reserves
10.7
3.6
0.0
14.3
Total 12/31/2021
167.7
22.6
0.0
190.3
 
Note:
 
Resource tonnes are inclusive of reserve tonnes
 
since they include the in-situ tonnes from which
 
recoverable coal reserves
are derived.
Note 2:
 
Coal resources are reported
 
on a dry basis.
 
Surface moisture and inherent moisture are excluded.
Note 3: The Property contains 14.3 Mt of dry, in-place measured and
 
indicated coal resources exclusive of reserves as
 
of
December 31, 2021.
11.3
 
Resources Exclusive of Reserves
The Property
 
contains multiple
 
resource blocks
 
which were
 
not deemed
 
to exhibit
 
reserve
potential
 
at
 
the
 
time
 
of
 
the
 
study.
 
These
 
resources,
 
formally
 
identified
 
as
 
resources
exclusive of reserves, are located in
 
the Pocahontas No. 3 coal
 
seam.
 
Reasons which may
preclude elevation of resources to reserves include, but are not limited to:
1.
 
Unfavorable economics at the PFS level, yet economics could become attractive in the
future under different market conditions.
 
2.
 
Exclusion from LOM planning by mining operator due to remaining resource blocks
which are relatively small, isolated blocks and not currently attractive from an
operational perspective.
 
Multiple resource blocks in the active Buchanan Mine have
not been considered as reserve due to relatively small size and isolation.
11.3.1
 
Initial Economic Assessment
MM&A
 
completed
 
an
 
initial
 
economic
 
assessment
 
to
 
determine
 
the
 
potential
 
economic
viability
 
of
 
resources
 
exclusive
 
of
 
reserves.
 
Unlike
 
the
 
economic
 
analysis
 
presented
 
in
Chapter 19 developed to test reserves, the initial economic assessment
 
below is presented
on
 
a
 
real
 
basis
 
in
 
2022
 
dollars.
 
MM&A
 
applied
 
relevant
 
technical
 
factors
 
to
 
estimate
potential saleable tonnes
 
without the
 
resource blocks,
 
should the resources
 
be extracted via
deep,
 
continuous
 
mining
 
methods
 
given
 
that
 
their
 
irregular
 
and
 
isolated
 
nature
 
may
preclude
 
longwall
 
mining.
 
MM&A
 
developed
 
cash
 
cost
 
profiles
 
for
 
the
 
resource
 
blocks,
including
 
direct
 
cash
 
costs
 
(labor,
 
supplies,
 
roof
 
control,
 
maintenance
 
and
 
repair,
 
power,
and
 
other);
 
washing,
 
trucking,
 
materials
 
handling,
 
general
 
and
 
administrative,
 
and
environmental
 
costs;
 
and
 
indirect
 
cash
 
costs
 
(royalties,
 
production
 
taxes,
 
property
 
tax,
insurance).
 
Costs
 
were
 
developed
 
based
 
off
 
relevant
 
cost
 
drivers
 
(per-meter,
 
per-raw-
tonne, per-clean-tonne).
 
Additionally,
 
MM&A estimated
 
capital costs
 
to extract
 
resources.
 
Capital
 
costs
 
associated
 
with
 
mine
 
development
 
were
 
amortized
 
across
 
the
 
resource’s
potential
 
saleable
 
tonnages.
 
Additional
 
non-cash
 
items
 
(depreciation
 
of
 
equipment
 
and
depletion) and cash costs were compared to an assumed sale price of $94 per tonne (FOB
loadout),
 
representing
 
the
 
long-term
 
average
 
price
 
forecast
 
for
 
Buchanan
 
supplied
 
by
Coronado.
 
Results of the analysis are
 
shown below and demonstrate potential
 
profitability
on a fully loaded cost basis.
 
Detailed summaries are shown in
Appendix E
.
 
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex962p38i1.jpg
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
29
Table 11
 
-4:
 
Results of Initial Economic Assessment
Seam
Resource
Block
Direct
Cash
Transportation,
Washing,
Enviro, G&A
Indirect
Non-Cash
Total Cost
Fully
Loaded
P&L
P3
N, NE,
NW
$51.09
$11.99
$6.58
$14.61
$84.28
$9.42
Figure 11-5:
 
Results of Initial Economic Assessment
11.4
 
Qualified Person’s Opinion
While
 
there
 
is
 
some
 
level
 
of
 
stratigraphically
 
controlled
 
seam-thickness
 
variability,
 
the
Pocahontas No. 3 coal seam at Buchanan demonstrates reasonable thickness consistency
according to the
 
classification system of
measured
 
(0 – 0.4
 
kilometer),
indicated
 
(0.4 to 1.2
kilometers), and
inferred
 
(1.2 to 4.8 kilometers).
 
MM&A geologists and engineers
 
modeled
the
 
deposit
 
and
 
delineated
 
mineable
 
regions
 
to
 
reflect
 
the
 
nature
 
of
 
each
 
seam
 
and
 
the
practicality
 
of
 
mining
 
constraints.
 
Based
 
on
 
MM&A’s
 
geostatistical
 
analysis,
 
it
 
would
 
be
possible to extend the measured arcs slightly beyond historically accepted practices due to
consistent geological settings.
 
These results have led the
 
QPs to report the data
 
following
the historical classification standards, rather than use the results of the DHSA.
Based
 
on
 
the
 
data
 
review,
 
the
 
attendant
 
work
 
done
 
to
 
verify
 
the
 
data
 
integrity
 
and
 
the
creation
 
of
 
an
 
independent
 
geologic
 
model,
 
the
 
QPs
 
believe
 
this
 
is
 
a
 
fair
 
and
 
accurate
representation of the Buchanan coal resources.
 
 
ex962p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
30
12
Mineral Reserve Estimates
12.1
 
Assumptions, Parameters and Methodology
Coal Reserves
 
are classified
 
as
proven
 
or
probable
 
considering “modifying
 
factors” including
mining, metallurgical, economic, marketing, legal, environmental, social, and governmental
factors.
 
>
Proven Coal Reserves
 
are the economically mineable part of a measured coal
resource, adjusted for diluting materials and allowances for losses when the material is
mined.
 
It is based on appropriate assessment and studies in consideration of and
adjusted for reasonably assumed modifying factors.
 
These assessments demonstrate
that extraction could be reasonably justified at the time of reporting.
 
>
Probable Coal Reserves
 
are the economically mineable part of an indicated coal
resource, and in some circumstances a measured coal resource, adjusted for diluting
materials and allowances for losses when the material is mined.
 
It is based on
appropriate assessment and studies in consideration of and adjusted for reasonably
assumed modifying factors.
 
These assessments demonstrate that extraction could be
reasonably justified at the time of reporting.
 
Upon completion of delineation and calculation of coal resources, MM&A generated a LOM
plan for
 
Buchanan.
 
The footprint of
 
the reserve area
 
is shown on
 
the map
 
in
Appendix B
.
 
The Mine plan was generated based on the forecast
 
mine plan and permit plan provided by
Coronado
 
with
 
modifications
 
by
 
MM&A
 
where
 
necessary
 
due
 
to
 
current
 
property
 
control
limits, modifications to geologic mapping, or
 
other factors determined during the evaluation.
Carlson Mining software was used to generate the LOM plan for Buchanan.
 
The mine plan
was sequenced based on productivity
 
schedules provided by Coronado.
 
MM&A judged the
productivity estimates and
 
plans to be
 
reasonable based
 
on experience
 
and current industry
practice.
At the Buchanan No. 1 Mine, a minimum mining height of 1.83 meters was used due to the
longwall mining method being employed.
 
For coal seams thinner than the assigned mining
height, the difference between the coal seam
 
height and assigned mining height consists
 
of
out-of-seam dilution (
OSD
).
 
Mine recovery generally varies between 40 and 60 percent for
continuous mining panels,
 
and 100 percent for
 
longwall.
 
Plant recovery is a
 
function of in-
seam recovery,
 
OSD and
 
plant efficiency
 
factor,
 
which is
 
set at
 
95 percent.
 
Typical
 
entry
width is 5.79 meters to 6.10 meters.
Raw,
 
ROM
 
production
 
data
 
outputs
 
from
 
LOM
 
plan
 
sequencing
 
were
 
processed
 
into
Microsoft
®
 
EXCEL
 
spreadsheets and
 
summarized on
 
an
 
annual basis
 
for
 
processing
 
into
the economic model.
 
Average seam densities
 
were estimated to
 
determine raw
 
coal tonnes
produced
 
from
 
the
 
LOM
 
plan.
 
Average
 
mine
 
recovery
 
and
 
wash
 
recovery
 
factors
 
were
applied to determine coal reserve tonnes.
 
 
 
ex962p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
31
Coal
 
reserve
 
tonnes
 
in
 
this
 
evaluation
 
are
 
reported
 
at
 
a
 
6.0-percent
 
moisture
 
basis
 
and
represent the saleable product from the Property.
Pricing
 
data
 
as
 
provided
 
by
 
Coronado
 
is
 
described
 
in
Section
 
16.2
.
 
The
 
pricing
 
data
assumes a weighted
 
average domestic and international
 
FOB-mine price of
 
approximately
$197 per
 
metric tonne
 
for calendar
 
year 2022.
 
The weighted
 
average price
 
decreases to
approximately
 
$118
 
to
 
$126
 
per
 
metric
 
tonne
 
through
 
year
 
2026
 
and
 
averages
approximately $152 per metric tonne over the LOM.
The coal resource
 
mapping and estimation
 
process described in this
 
report was used
 
as a
basis for the coal
 
reserve estimate.
 
Proven and probable coal
 
reserves were derived from
the
 
defined
 
coal
 
resource
 
considering
 
relevant
 
processing,
 
economic
 
(including
 
technical
estimates of
 
capital, revenue,
 
and cost),
 
marketing, legal,
 
environmental, socio-economic,
and regulatory factors and are presented on a moist, recoverable basis.
As is customary in the US, the categories for proven and probable coal reserves are based
on the distances
 
from valid points
 
of measurement as
 
determined by the
 
QPs for the
 
area
under
 
consideration.
 
For
 
this
 
evaluation,
 
measured
 
resource,
 
which
 
may
 
convert
 
to
 
a
proven reserve, is based on a 0.4-kilometer radius from a valid point of observation.
Points of observation include exploration drill holes,
 
degas holes, and mine measurements
which have been
 
fully vetted and
 
processed into a
 
geologic model.
 
The geologic model
 
is
based
 
on
 
seam
 
depositional
 
modeling,
 
the
 
interrelationship
 
of
 
overlying
 
and
 
underlying
strata
 
on
 
seam
 
mineability,
 
seam
 
thickness
 
trends,
 
the
 
impact
 
of
 
seam
 
structure
 
(i.e.,
faulting),
 
intra-seam
 
characteristics,
 
etc.
 
Once
 
the
 
geologic
 
model
 
was
 
completed,
 
a
statistical analysis,
 
described in
Section 11.1.1
 
was conducted
 
and a
 
0.4-kilometer radius
from a valid point of observation was selected to define Measured Resources.
 
Likewise,
 
the
 
distance
 
between
 
0.4
 
and
 
1.2
 
of
 
a
 
kilometer
 
radius
 
was
 
selected
 
to
 
define
Indicated Resources.
 
Indicated Resources may convert to Probable Reserves.
 
There are
 
no Inferred
 
Resources (greater
 
than a
 
1.2-kilometer radius
 
from a
 
valid point
 
of
observation) at Buchanan.
12.2
 
Qualified Person’s Estimates
Reserve
 
tonnage
 
estimates
 
provided
 
herein
 
report
 
coal
 
reserves
 
derived
 
from
 
the
 
in-situ
resource
 
tonnes
 
presented
 
in
Table
 
11-3
,
 
and
 
not
 
in
 
addition
 
to
 
coal
 
resources.
 
Coal
reserves are presented on a ROM basis in
Table 12-1
.
 
Proven and probable coal reserves
were
 
derived
 
from
 
the
 
defined
 
coal
 
resource
 
considering
 
relevant
 
mining,
 
processing,
infrastructure, economic
 
(including estimates
 
of capital,
 
revenue, and
 
cost), marketing,
 
legal,
environmental,
 
socio-economic
 
and
 
regulatory
 
factors.
 
The
 
coal
 
reserves,
 
as
 
shown
 
in
Table
 
12-2
, are based on a technical evaluation of
 
the geology and a preliminary feasibility
study of
 
the coal
 
deposits.
 
The extent
 
to which
 
the coal
 
reserves may
 
be affected
 
by any
known environmental,
 
permitting, legal,
 
title, socio-economic,
 
marketing, political,
 
or other
relevant issues has
 
been reviewed rigorously.
 
Similarly,
 
the extent to
 
which the estimates
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
32
of coal reserves
 
may be materially
 
affected by mining,
 
metallurgical, infrastructure and
 
other
relevant factors has also been considered.
 
Table 12-1:
 
Coal ROM (Moist) Summary as of December 31, 2021
 
Demonstrated Coal Reserves (Mt, Moist ROM)
Quality (Dry)
 
By Reliability Category
By Mining Type
By Control Type
Area /
Mine
Proven
Probable
Total
Surface
UG
Owned
Leased
Subleased
Ash
Sulfur
Vol
Buchanan
142.3
17.3
159.6
0.0
159.6
25.8
128.8
5.0
42
0.7
12
Table 12-2:
 
Coal Reserves Summary (Marketable Sales Basis) as of
 
December 31, 2021
 
Demonstrated Coal Reserves (Wet Tons, Washed or Direct Shipped, Mt)
Quality (Dry Basis)
 
By Reliability Category
By Mining Type
By Control Type
Area / Mine
Proven
Probable
Total
Surface
UG
Owned
Leased
Subleased
Ash%
Sulfur%
VM%
Buchanan Mine
Complex
87.4
10.6
98.0
0.0
98.0
17.0
77.5
3.4
6
0.7
19
 
Note: Marketable reserve tonnes are reported
 
on a moist basis, including a combination of
 
surface and inherent moisture.
 
The
combination of surface and inherent moisture is
 
modeled between 4.5 and 6-percent, depending
 
upon mining method.
 
Actual
product moisture is dependent upon multiple geological
 
factors, operational factors, and product contract
 
specifications and can
exceed 8-percent.
 
As such, the modeled moisture values provide a level
 
of conservatism for reserve reporting.
The results of
 
this TRS define
 
an estimated 98.0
 
Mt of proven
 
and probable marketable
 
coal
reserves.
 
Of that total,
 
89 percent are
 
proven, and 11 percent are probable.
 
There are 17.0
Mt of owned
 
coal reserves and
 
77.5 Mt of
 
leased coal and
 
3.4 Mt of
 
subleased reserves.
 
All
the Buchanan reserves are considered suitable for
 
the metallurgical coal market, and all of
the Buchanan reserves are assigned.
12.3
 
Qualified Person’s Opinion
The
 
estimate of
 
coal
 
reserves was
 
determined
 
in accordance
 
with the
 
JORC Code
 
along
with SEC Regulation S-K 1300.
The LOM
 
mining plan
 
for Buchanan
 
was prepared
 
to the
 
level of
 
preliminary feasibility.
 
Mine
projections
 
were
 
prepared
 
with
 
a
 
timing
 
schedule
 
to
 
match
 
production
 
with
 
coal
 
seam
characteristics.
 
Production timing was carried out from current locations to depletion of the
coal reserve
 
area.
 
Coal reserve
 
estimates could
 
be materially
 
affected by
 
the risk
 
factors
described in
Section 22.2
.
 
Based on the preliminary feasibility study and the attendant economic review, the QPs
believe this is a fair and accurate calculation of the Buchanan coal reserves.
13
Mining Methods
13.1
 
Geotech and Hydrology
Mining
 
plans
 
for
 
potential
 
underground
 
mines
 
were
 
developed
 
by
 
Coronado
 
and
 
MM&A.
 
Pillar
 
stability
 
was
 
tested
 
by
 
MM&A
 
using
 
the
Analysis
 
of
 
Retreat
 
Mining
 
Pillar
 
Stability
(ARMPS
) and
Analysis of Longwall Pillar
 
Stability
(
ALPS
) programs that were
 
developed by
the
National Institute for
 
Occupational Safety and
 
Health (
NIOSH
)
.
 
MM&A reviewed the
 
 
ex962p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
33
results from the ARMPS
 
and ALPS analysis and
 
considered them in
 
the development of the
LOM plan.
Hydrology has
 
not been an
 
issue of
 
concern at Buchanan.
 
Based on numerous
 
site visits
to
 
both
 
the
 
surface
 
and
 
underground
 
portions
 
of
 
the
 
Property
 
by
 
the
 
QPs,
 
it
 
has
 
been
determined that
 
this is
 
not a
 
significant concern.
 
Mining of
 
future reserves
 
is projected
 
to
occur in areas which exhibit
 
similar hydrogeological characteristics as those
 
formerly mined
areas.
13.2
 
Production Rates
The Buchanan mine is active
 
with six continuous mining sections
 
and one longwall section
currently operating.
 
Operations at Buchanan by Coronado
 
and its predecessor have been
ongoing
 
for
 
many
 
years.
 
The
 
mine
 
plan
 
and
 
productivity
 
expectations
 
reflect
 
historical
performance
 
and
 
efforts
 
have
 
been
 
made
 
to
 
adjust
 
the
 
plan
 
to
 
reflect
 
future
 
conditions.
 
MM&A is
 
confident that
 
the mine
 
plan is
 
reasonably representative
 
to provide
 
an accurate
estimation
 
of
 
coal
 
reserves.
 
Mine
 
development
 
and
 
operation
 
have
 
not
 
been
 
optimized
within the TRS.
Longwall
 
production
 
is
 
scheduled
 
for
 
approximately
 
295
 
to
 
312
 
days
 
each
 
year,
 
which
represents
 
production
 
on
 
Monday
 
through
 
Saturday
 
with
 
allowances
 
for
 
holidays
 
and
longwall moves.
 
On each
 
day,
 
the continuous
 
mining sections
 
and longwall
 
produce coal
on three shifts.
 
The sections are configured as regular sections with one
 
continuous miner
available for production on each
 
section.
 
Productivity is planned at the
 
rate of 17.6 meters
to 21.7 meters of advance per
 
shift of operation for the
 
continuous miner sections, and 6.28
meters to 7.44 meters per shift of longwall retreat.
 
Carlson Mining
 
software was
 
used by
 
MM&A to
 
generate mine
 
plans for
 
the underground
mineable
 
coal
 
seam.
 
Coronado
 
recently
 
revised
 
the
 
Buchanan
 
mine
 
plan
 
with
 
an
independent headgate and tailgate for longwall panels in the South and Northeast districts.
 
Such a change was
 
made to allow for
 
an effective panel width of
 
982 feet, as
 
opposed to an
effective of width of 688
 
feet used previously.
 
The active areas in
 
the North and East,
 
along
with the future Northwest
 
area, are still based
 
on an effective
 
panel width of approximately
688 feet.
 
MM&A incorporated
 
this mine
 
plan revision
 
into the
 
layout and
 
subsequent reserve
estimates contained herein.
 
Mine plans were
 
sequenced based on
 
productivity schedules
provided
 
by
 
Coronado, which
 
were
 
based
 
on historically
 
achieved productivity
 
levels.
 
All
production forecasting
 
ties assumed
 
production rates
 
to geological
 
models as
 
constructed
by MM&A’s
 
team of geologists and mining engineers.
As shown in
Table 13-1
, the areas planned for underground production continue
 
until 2047.
 
Clean coal production varies directly with coal thickness.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
34
Table 13-1:
 
Summary of Production by Year (Tonnes x 1,000)
Mine
Name
2022
2023
2024
2025
2026
2027
2028
2029
Buchanan
4,336
3,813
3,744
3,695
4,538
4,336
4,317
4,563
 
 
 
 
 
 
 
 
 
Mine
Name
2030
2031
2032
2033
2034
2035
2036
2037
Buchanan
4,743
3,952
4,271
3,108
3,839
3,939
3,095
3,340
 
 
 
 
 
 
 
 
 
Mine
Name
2038
2039
2040
2041
2042
2043
2044
2045
Buchanan
3,854
4,722
4,655
3,755
3,575
3,583
3,399
3,154
 
 
 
 
 
 
 
 
 
Mine
Name
2046
2047
2048
2049
2050
2051
2052
2053
Buchanan
2,845
836
0
0
0
0
0
0
13.3
 
Mining Related Requirements
Although the
 
Continuous Miner
 
Sections are
 
significantly more
 
expensive to
 
operate on
 
a
cost-per-tonne basis, they are necessary
 
to open up areas of the
 
mine for the longwall.
 
At
the time of this study,
 
Buchanan had 6 operating continuous
 
miner stations that were used
to
 
develop
 
main
 
entries
 
and
 
gate
 
roads
 
in
 
preparation
 
for
 
the
 
longwall.
 
As
 
the
 
mine
develops, this number will be able to be reduced.
An additional
 
requirement at
 
Buchanan is
 
the drilling
 
of degas
 
holes prior
 
to mining.
 
This
process was initially developed as a
 
safety measure to extract methane
 
from the coal seam
prior to exposure to the workforce.
 
As such, it has been very effective.
More recently,
 
the methane extracted
 
has been able
 
to be processed
 
and sold.
 
However,
degasifying of the coal seam will continue as a safety measure regardless.
13.4
 
Required Equipment and Personnel
The Buchanan Mine is
 
currently Coronado’s only longwall
 
operation.
 
The longwall shearing
machine is used
 
for extraction of
 
coal at the
 
production face.
 
A chain conveyor
 
is used to
remove
 
coal
 
from
 
the
 
longwall
 
face
 
for
 
discharge
 
onto
 
the
 
conveyor
 
belt
 
which
 
then
ultimately
 
deliver
 
it
 
to
 
an
 
underground
 
storage
 
bunker.
 
Development
 
for
 
the
 
longwall
 
is
conducted by the extraction of coal from the production faces using continuous
 
miners and
haulage
 
using
 
shuttle
 
cars
 
to
 
a
 
feeder-breaker
 
located
 
at
 
the
 
tail
 
of
 
the
 
section
 
conveyor
belt.
 
The feeder-breaker
 
crushes large pieces
 
of coal and
 
rock and regulates
 
coal feed onto
the mine conveyor.
 
Roof-bolting machines are
 
used to support
 
the roof on
 
the development
sections
 
of
 
the
 
longwall mines.
 
Roof-bolting
 
machines
 
are
 
used
 
to
 
install
 
roof
 
bolts,
 
and
battery scoops are
 
available to clean
 
the mine entries
 
and assist in
 
delivery of mine
 
supplies
to work areas.
 
Other supplemental equipment such as personnel carriers, supply vehicles,
etc., are also used daily.
 
 
ex962p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
35
Mine conveyors typically range in
 
width up to 1.83
 
meters.
 
Multiple belt flights are
 
arranged
in
 
series
 
to
 
deliver
 
raw
 
coal
 
to
 
the
 
underground
 
storage.
 
Along
 
the
 
main
 
and
 
sub-main
entries
 
and
 
panels,
 
a
 
travel
 
way
 
is
 
provided
 
for
 
personnel
 
and
 
materials
 
by
 
rubber-tired
equipment or
 
on rail.
 
The Buchanan
 
No. 1
 
Mine utilizes
 
a skip
 
hoist in
 
order to
 
transport
ROM
 
coal
 
from
 
the
 
underground
 
storage
 
bunker
 
to
 
the
 
surface
 
where
 
the
 
coal
 
may
 
be
sampled, crushed and washed in the preparation plant and stockpiled to await shipment.
 
Surface
 
ventilation
 
fans
 
are
 
installed
 
as
 
needed
 
to
 
provide
 
a
 
sufficient
 
volume
 
of
 
air
 
to
ventilate production sections, coal haulage and transport entries,
 
battery charging stations,
and
 
transformers
 
in
 
accordance
 
with
 
approved
 
plans.
 
High-voltage
 
cables
 
deliver
 
power
throughout
 
the
 
mine
 
where
 
transformers
 
reduce
 
voltage
 
for
 
specific
 
equipment
requirements.
 
The Mine Improvement and
 
New Emergency Response
 
Act of 2006
 
(
MINER
Act
)
 
requires
 
that
 
carbon
 
monoxide
 
detection
 
systems
 
be
 
installed
 
along
 
mine
 
conveyor
belts
 
and
 
that
 
electronic
 
two-way
 
tracking
 
and
 
communications
 
systems
 
be
 
installed
throughout underground mines.
 
Water is required to
 
control dust at
 
production sections and
along conveyor
 
belts, and
 
to cool
 
electric motors.
 
Water is
 
available from
 
nearby sources
and is distributed within the mine by pipelines as
 
required.
 
A total of 488 salary and hourly
employees are assigned to the mine.
14
Processing and Recovery Methods
14.1
 
Description or Flowsheet
Coronado
 
currently operates
 
a
 
coal preparation
 
plant
 
at Buchanan.
 
The Buchanan
 
Plant
operates at a feed rate
 
of approximately 1,270 raw tonnes
 
per hour (
tph
).
 
Coarse material
is
 
washed
 
in
 
a
 
heavy
 
medium
 
vessel,
 
the
 
intermediate-size
 
material
 
is
 
washed
 
in
 
heavy
medium
 
cyclones and
 
fine
 
material
 
is washed
 
using froth
 
flotation.
 
These processes
 
are
supported
 
by
 
the
 
requisite
 
screens,
 
centrifuges,
 
vacuum
 
filters,
 
sumps,
 
pumps,
 
and
distribution systems.
 
Processes and
 
equipment are
 
typical of
 
those used
 
in the
 
coal industry
and are in use in nearly all plants in the Central Appalachian Basin.
 
14.2
 
Requirements for Energy, Water,
 
Material and Personnel
Personnel have historically
 
been sourced from
 
the surrounding communities
 
in Buchanan,
Tazewell,
 
McDowell,
 
and
 
Pike
 
Counties,
 
and
 
have
 
proven
 
to
 
be
 
adequate
 
in
 
numbers
 
to
operate the
 
mine.
 
As mining
 
is common
 
in the surrounding
 
areas, the
 
workforce is
 
generally
familiar with mining practices, and many are experienced miners.
The Buchanan No.
 
1 Mine Complex
 
has sources of
 
water,
 
power, personnel,
 
and supplies
readily available
 
for use.
 
Water is
 
sourced locally from
 
a nearby abandoned
 
underground
mine.
 
Electricity is
 
sourced from
 
AEP.
 
The service
 
industry in
 
the areas
 
surrounding the
mine complex has historically provided supplies, equipment repairs and fabrication, etc.
 
 
ex962p2i0.jpg
 
 
ex962p45i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
36
15
Infrastructure
The Coronado-owned
 
Buchanan Preparation
 
Plant services
 
the mine
 
via a
 
skip hoist
 
and
conveyor
 
belt system
 
which
 
transports extracted
 
coal from
 
an underground
 
bunker to
 
the
surface facility.
 
The NS rail line serves as the main means of transport from the mine.
As
 
an active
 
operation, the
 
necessary
 
support infrastructure
 
for Buchanan
 
is in
 
place.
 
In
addition to the plant and loadout, there are also portal facilities, including personnel access
to the mine, ventilation fans and a coal
 
hoisting skip shaft.
 
A map of the existing facilities in
Figure 15-1
.
Figure 15-1:
 
Buchanan Surface Facilities
16
Market Studies
16.1
 
Market Description
The
 
quality
 
characteristics
 
for
 
the
 
subject
 
coal
 
resources
 
and
 
coal
 
reserves
 
have
 
been
reviewed in
 
detail by
 
MM&A.
 
The drill
 
hole data
 
were utilized
 
to develop
 
average coal
 
quality
characteristics
 
for
 
the
 
mining
 
site.
 
These
 
average
 
coal
 
quality
 
characteristics
 
were
 
then
utilized
 
as
 
the
 
basis
 
for determining
 
the
 
various markets
 
into
 
which
 
the
 
saleable
 
coal
 
will
likely be placed.
 
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
37
The projected quality specifications for the Buchanan products are as shown in
Table
 
16-1
.
Table 16-1:
 
Quality Specifications by Product
 
Buchanan
 
HCC
PCI
Moisture (%)
7.50
7.50
Ash (%)
5.50
6.00
Sulfur (%)
0.75
0.85
Volatile Matter (%)
18.00
18.00
Btu/lb.
N/A
14,926
Fluidity (ddpm)
130
N/A
MMR (%)
1.69
N/A
CSR
40
N/A
FSI
8.5
N/A
Note:
 
All Specs are dry basis except Moisture and
 
Thermal
All the
 
mine production
 
serves the
 
metallurgical markets.
 
The metallurgical
 
coal is
 
marketed
as a low-volatile (typically less than 23 percent volatile matter content) product.
16.2
 
Price Forecasts
Coronado provided MM&A with price forecasts for the Buchanan operation.
 
Customer coal
pricing is
 
derived from
 
market observed
 
forward estimates
 
based on
 
global economic
 
supply
and demand
 
analysis which
 
is applied
 
to mine plan
 
sales volumes
 
and product
 
mix and
 
is
supplemented
 
with
 
Coronado’s
 
in-house
 
knowledge
 
of
 
applicable
 
rail
 
transportation
charges,
 
ocean
 
freight
 
charges
 
and
 
port
 
charges.
 
Concurrent
 
with
 
the
 
active
 
operation,
Buchanan’s
 
production is
 
assumed to
 
enter domestic
 
and international
 
low volatile
 
coking
coal
 
markets.
 
Pricing
 
provided
 
by
 
Coronado
 
assumes
 
applicable
 
quality
 
adjustments.
 
Pricing
 
was
 
provided
 
through
 
calendar
 
year
 
2050
 
(after
 
which
 
sales
 
prices
 
were
 
held
constant).
 
Coal price forecasts for
 
the Buchanan products were
 
provided by Coronado for
 
various coal
markets in terms of US nominal dollars per metric tonne.
 
16.3
 
Contract Requirements
Some contracts
 
are necessary
 
for successful
 
marketing of
 
the coal.
 
For Buchanan,
 
since
all
 
mining,
 
preparation
 
and
 
marketing
 
is
 
done
 
in-house,
 
the
 
remaining
 
contracts
 
required
are:
>
Transportation
 
– The Mine contracts with NS to transport the coal to either the
domestic customers or to the Pier 6 export terminal for overseas shipment.
>
Handling
 
– Contracts for loading vessels for export sales are necessary.
 
These are
typically handled by annual negotiations based on projected shipments.
>
Sales
– Sales contracts are a mix of spot and contract sales.
 
With the volatility of the
market, long-term contracts are not typically written.
 
 
ex962p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
38
17
Environmental Studies, Permitting and Plans,
Negotiations or
 
Agreements with Local
Individuals
 
17.1
 
Results of Studies
MM&A completed a Limited Phase I
 
Environmental Site Assessment (
ESA
) on the Property
in April 2016 on behalf of Coronado.
 
Coronado reports not having conducted such a study
since the MM&A study.
 
The ESA
 
completed by MM&A included
 
a site inspection, review
 
of
historical records, a database search of state and federal regulatory records and interviews
to
 
identify
 
potential
 
recognized
 
environmental
 
conditions
 
(
RECs
)
 
that
 
may
 
create
environmental liability for the sites.
 
MM&A concluded that no long-term liabilities existed at
the time of the ESA.
Based
 
on
 
the
 
former
 
ESA
 
completed
 
by
 
MM&A,
 
it
 
is
 
the
 
QPs’
 
opinion
 
that
 
Buchanan
generally
 
has
 
a
 
record
 
consistent
 
with
 
industry
 
standards
 
regarding
 
compliance
 
with
applicable mining, water
 
quality, and environmental laws.
 
Estimated costs for
 
mine closure,
including
 
water
 
quality
 
monitoring
 
during
 
site
 
reclamation,
 
are
 
included
 
in
 
the
 
financial
models.
17.2
 
Requirements and Plans for Waste Disposal
Based on
 
a study
 
commissioned by
 
Coronado in June
 
2020, the current
 
Buchanan refuse
disposal site
 
adjacent to
 
the preparation
 
plant has
 
a capacity
 
of 29
 
million cubic
 
meters (
CM
)
as
 
currently
 
designed;
 
with
 
an
 
additional
 
lift
 
(No.
 
11),
 
the
 
capacity
 
is
 
37
 
million
 
CM.
 
Projected requirements
 
within the
 
MM&A financial
 
model
 
are 28.4
 
million CM.
 
Permitting
for such an expansion is anticipated to be achievable.
17.3
 
Permit Requirements and Status
All
 
mining
 
operations
 
are
 
subject
 
to
 
federal
 
and
 
state
 
laws
 
and
 
must
 
obtain
 
permits
 
to
operate
 
mines,
 
coal
 
preparation
 
and
 
related
 
facilities,
 
haul
 
roads,
 
and
 
other
 
incidental
surface
 
disturbances
 
necessary
 
for
 
mining
 
to
 
occur.
 
Permits
 
generally
 
require
 
that
 
the
permittee post a performance
 
bond in an amount
 
established by the regulatory
 
program to
provide
 
assurance
 
that
 
any
 
disturbance
 
or
 
liability
 
created
 
during
 
mining
 
operations
 
is
properly
 
restored
 
to
 
an
 
approved
 
post-mining
 
land
 
use
 
and
 
that
 
all
 
regulations
 
and
requirements of the
 
permits are fully
 
satisfied before the
 
bond is returned
 
to the permittee.
 
Significant penalties exist for
 
any permittee who fails
 
to meet the obligations of
 
the permits
including cessation of mining
 
operations, which can lead to
 
potential forfeiture of the
 
bond.
 
Any
 
company,
 
and
 
its directors,
 
owners
 
and officers,
 
which
 
are
 
subject
 
to bond
 
forfeiture
can be denied future permits under the program.
1
New permits or permit revisions will
 
occasionally be necessary to facilitate the
 
expansion or
addition
 
of
 
new
 
mining
 
areas
 
on
 
the
 
properties,
 
such
 
as
 
amendments
 
to
 
existing
 
permits
and
 
new
 
permits
 
for
 
mining
 
of
 
reserve
 
areas.
 
Exploration
 
permits
 
also
 
are
 
required.
 
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
39
Property under lease
 
includes provisions for
 
exploration among the
 
terms of the
 
lease.
 
New
or
 
modified
 
mining
 
permits
 
are
 
subject
 
to
 
a
 
public
 
advertisement
 
process
 
and
 
comment
period, and the public is provided an
 
opportunity to raise objections to any proposed
 
mining
operation.
 
MM&A is not aware of any specific prohibition of mining
 
on the subject property
and given sufficient
 
time and planning,
 
Coronado should be
 
able to secure
 
new permits to
maintain its planned mining operations within the
 
context of current regulations.
 
Necessary
permits
 
are in
 
place to
 
support
 
current production
 
on the
 
Property,
 
but
 
future
 
permits are
required to maintain and expand
 
production.
 
Portions of the Property
 
are located near local
communities.
 
Regulations
 
prohibit
 
mining
 
activities
 
within
 
91.44
 
meters
 
of
 
a
 
residential
dwelling, school, church, or
 
similar structure unless
 
written consent is
 
first obtained from the
owner of
 
the structure.
 
Where required, such
 
consents have been
 
obtained where
 
mining
is proposed beyond the regulatory limits.
Coronado
 
has
 
obtained
 
all
 
mining
 
and
 
discharge
 
permits
 
to
 
operate
 
its
 
mines
 
and
processing,
 
loadout,
 
or
 
related
 
facilities.
 
MM&A
 
is
 
unaware
 
of
 
any
 
obvious
 
or
 
current
Coronado
 
permitting
 
issues
 
that
 
are
 
expected
 
to
 
prevent
 
the
 
issuance
 
of
 
future
 
permits.
 
Buchanan, along with all coal producers, is
 
subject to a level of uncertainty regarding
 
future
clean
 
water
 
permits
 
due
 
to
United
 
States
 
Environmental
 
Protection
 
Agency
(
EPA
)
involvement with state programs.
The active Mining permit currently held by Buchanan is shown in
Table 17-1.
Table 17-1:
 
Buchanan Mining Permit
Type
Permit ID
Permit Name
$ Bond
Current
Status
Issued
Date
Expiration
Date
Hectares
NPDES
No.
Coal
Underground
1402152
Buchanan
No. 1 Mine
$2,541,000
Active
03/08/1983
03/08/2023
330.48
VA0082152
_________________________________________________________
1
 
Monitored under the Applicant Violator System (AVS) by the Federal Office of Surface Mining
17.4
 
Local Plans, Negotiations or Agreements
MM&A found no indication of agreements beyond the scope of federal or state regulations.
17.5
 
Mine Closure Plans
Applicable regulations require that
 
mines be properly closed,
 
and reclamation commenced
immediately
 
upon
 
abandonment.
 
In
 
general,
 
site
 
reclamation
 
includes
 
removal
 
of
structures, backfilling, regrading,
 
and revegetation of
 
disturbed areas.
 
Sediment control is
required
 
during
 
the
 
establishment
 
of
 
vegetation,
 
and
 
bond
 
release
 
generally
 
requires
 
a
minimum
 
five-year
 
period
 
of
 
site
 
maintenance,
 
water
 
sampling,
 
and
 
sediment
 
control
following mine completion.
 
This requirement is reduced to two years for certain operations
involving
 
re-mining.
 
Reclamation
 
of
 
underground
 
mines
 
includes
 
closure
 
and
 
sealing
 
of
mine openings such as portals and shafts in addition to the items listed above.
 
 
 
ex962p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
40
Estimated costs for mine
 
closure, including water quality
 
monitoring during site reclamation,
are included in the
 
financial model.
 
As with all mining
 
companies, an accretion calculation
is performed annually so the necessary Asset Retirement Obligations (
ARO
) can be shown
as a Liability on the balance sheet.
17.6
 
Qualified Person’s Opinion
The
 
Buchanan
 
Mine
 
is
 
an
 
operating
 
facility;
 
all
 
necessary
 
permits
 
for
 
current
 
production
have been
 
obtained.
 
The QPs
 
know
 
of no
 
reason that
 
any permits
 
revisions that
 
may be
required cannot be obtained.
 
Estimated expenditures for site closure and reclamation are included
 
in the financial model
for this site.
18
Capital and Operating Costs
18.1
 
Capital Cost Estimate
The
 
production
 
sequence
 
selected
 
for
 
a
 
property
 
must
 
consider
 
the
 
proximity
 
of
 
each
reserve area
 
to coal
 
preparation plants,
 
river docks and
 
railroad loading
 
points, along with
suitability of production equipment to
 
coal seam conditions.
 
The in-place infrastructure was
evaluated, and
 
any future
 
needs were
 
planned to
 
a level
 
suitable for
 
a Preliminary
 
Feasibility
Study and included in the Capital Forecast.
Coronado provided MM&A
 
with an inventory
 
of operating equipment
 
available at Buchanan.
 
MM&A’s
 
capital schedules assume that major
 
equipment rebuilds occur over the
 
course of
each machine’s remaining
 
assumed operating life.
 
Replacement equipment was
 
scheduled
based on MM&A’s
 
experience and knowledge of mining equipment and
 
industry standards
with respect to the useful life of such equipment.
A summary of the estimated capital for the Property is provided in
Figure 18-2
 
below.
 
 
 
ex962p2i0.jpg ex962p14i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
41
Figure 18-1:
 
CAPEX
18.2
 
Operating Cost Estimate
Coronado
 
provided
 
historical
 
and
 
a
 
preliminary
 
five-year
 
projection
 
of
 
operating
 
costs
 
for
MM&A’s
 
review.
 
MM&A used
 
the historical
 
and/or budget
 
cost information
 
as a
 
reference
and
 
developed
 
a
 
personnel
 
schedule
 
for
 
the
 
mine.
 
Hourly
 
labor
 
rates
 
and
 
salaries
 
were
based upon information contained in Coronado’s financial summaries.
 
Fringe-benefit costs
were
 
developed
 
for
 
vacation
 
and
 
holidays,
 
federal
 
and
 
state
 
unemployment
 
insurance,
retirement,
 
workers’
 
compensation
 
and
 
pneumoconiosis,
 
casualty
 
and
 
life
 
insurance,
healthcare,
 
and
 
bonuses.
 
A
 
cost
 
factor
 
for
 
mine
 
supplies
 
was
 
developed
 
that
 
relates
expenditures
 
to
 
mine
 
advance
 
rates
 
for
 
roof-control
 
costs
 
and
 
other
 
mine-supply
 
costs
experienced
 
at
 
underground
 
mines.
 
Other
 
factors
 
were
 
developed
 
for
 
maintenance
 
and
repair costs, rentals, mine power, outside services and other direct mining costs.
 
Other cost
 
factors were
 
developed for
 
coal preparation
 
plant processing,
 
refuse handling,
coal
 
loading,
 
property
 
taxes,
 
and
 
insurance and
 
bonding.
 
Appropriate
 
royalty
 
rates
 
were
assigned for
 
production from
 
leased coal
 
lands, and
 
sales taxes
 
were calculated
 
for state
severance taxes, the federal black lung excise tax, and federal and state reclamation fees.
Mandated Sales Related Costs such as Black Lung Excise are summarized in
 
Table
 
18-1.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
42
Table 18-1:
 
Estimated Coal Production Taxes and Sales Costs
Description of Tax or Sales Cost
Basis of Assessment
Cost
Federal Black Lung Excise Tax - Underground
Per Tonne
$1.21
 
Federal Reclamation Fees – Underground
Per Tonne
$0.13
 
Virginia Reclamation Tax – Underground
Per Tonne
$0.05
 
Virginia Severance Tax
 
2%
Royalties – Underground
Percentage of Revenue
3.65%
Notes:
 
1.
 
Federal black lung excise tax is paid only on
 
coal sold domestically.
 
MM&A assumed 45%
of total coal sales to be domestic in the economic analysis
 
discussed below.
 
A summary of the projected Operating Costs is in
Table
 
18-2
.
Table 18-2:
 
Buchanan Mine Operating Costs
 
Total
YE
12/31
2022
YE
12/31
2023
YE
12/31
2024
YE
12/31
2025
YE
12/31
2026
YE
12/31
2027
YE
12/31
2028
YE
12/31
2029
Remaining
LOM
Average
ROM Production
Tonnes
168.5
7.3
7.3
7.3
7.3
9.1
7.4
7.6
7.8
6.0
Yield
58.16
%
59.40
%
52.48
%
51.13
%
50.55
%
49.87
%
58.44
%
57.17
%
58.65
%
60.18%
Saleable Production
Tonnes
98.0
4.3
3.8
3.7
3.7
4.5
4.3
4.3
4.6
3.6
 
Thermal Tonnes
-
-
-
-
-
-
-
-
-
-
Domestic & Non-Asia
Export Met Tonnes
31.6
1.4
1.2
1.2
1.2
1.5
1.4
1.4
1.5
1.2
Export Met Tonnes
66.4
2.9
2.6
2.5
2.5
3.1
2.9
2.9
3.1
2.4
 
Total Saleable Tonnes
98.0
4.3
3.8
3.7
3.7
4.5
4.3
4.3
4.6
3.6
 
Cash Costs per Tonne:
Mining Costs
$61.03
 
$49.68
 
$53.80
 
$56.63
 
$58.66
 
$50.02
 
$52.22
 
$53.78
 
$52.19
 
 
$65.08
 
Processing and
Transport
 
$8.76
 
 
$8.15
 
 
$8.00
 
 
$8.32
 
 
$8.54
 
 
$7.72
 
 
$7.55
 
 
$7.86
 
 
$7.81
 
 
$9.17
 
Sales Related Costs
 
$8.04
 
$10.09
 
 
$6.53
 
 
$7.04
 
 
$7.04
 
 
$6.67
 
 
$6.82
 
 
$6.96
 
 
$7.10
 
 
$8.42
 
G&A
 
$2.12
 
 
$1.55
 
 
$1.79
 
 
$1.86
 
 
$1.92
 
 
$1.62
 
 
$1.84
 
 
$1.87
 
 
$1.91
 
 
$2.29
 
 
Total Cash Costs
$79.95
 
$69.47
 
$70.12
 
$73.84
 
$76.16
 
$66.03
 
$68.42
 
$70.48
 
$69.01
 
 
$84.95
 
19
Economic
 
Analysis
19.1
 
Assumptions, Parameters and Methods
A
 
pre-feasibility LOM
 
plan
 
was prepared
 
by MM&A
 
for
 
the Buchanan
 
operations.
 
MM&A
prepared
 
mine
 
projections
 
and
 
production
 
timing
 
forecasts
 
based
 
on
 
coal
 
seam
characteristics.
 
Production timing
 
was
 
carried out
 
from 2022
 
to
 
depletion (exhaustion)
 
of
the coal reserve areas, which
 
is projected for the year 2047.
 
All costs and prices are
 
based
on 2021 nominal United States dollars.
The
 
Mine
 
plan,
 
productivity
 
expectations
 
and
 
cost
 
estimates
 
generally
 
reflect
 
historical
performance by Coronado
 
and efforts have
 
been made to
 
adjust plans and costs
 
to reflect
future conditions.
 
MM&A is confident
 
that the mine plan
 
and financial model
 
are reasonably
representative to provide an accurate estimation of coal reserves.
 
 
ex962p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
43
Capital schedules were developed by MM&A for mine development, infrastructure, and on-
going
 
capital
 
requirements
 
for
 
the
 
life
 
of
 
the
 
mine.
 
Staffing
 
levels
 
were
 
prepared,
 
and
operating
 
costs
 
estimated
 
by
 
MM&A.
 
MM&A
 
utilized
 
historical
 
cost
 
data
 
provided
 
by
Coronado and
 
its own knowledge
 
and experience to
 
estimate direct and
 
indirect operating
costs.
 
The preliminary feasibility financial model, prepared for this TRS, was
 
developed to test the
economic
 
viability
 
of
 
the
 
coal
 
reserve
 
area.
 
The
 
results
 
of
 
this
 
financial
 
model
 
are
 
not
intended to
 
represent a
 
bankable feasibility
 
study,
 
required for
 
financing of
 
any current
 
or
future mining
 
operations, but
 
are intended to
 
prove the
 
economic viability of
 
the estimated
coal
 
reserves.
 
All
 
costs
 
and
 
prices
 
are
 
based
 
on
 
2021
 
nominal
 
United
 
States
 
dollars
assuming a 2% inflation rate.
On an unlevered basis, the NPV of the project cash flows after taxes
 
was estimated for the
purpose
 
of
 
classifying coal
 
reserves.
 
The project
 
cash flows,
 
excluding
 
debt service,
 
are
calculated
 
by
 
subtracting direct
 
and
 
indirect operating
 
expenses and
 
capital expenditures
from
 
revenue.
 
Direct
 
costs
 
include
 
labor,
 
drilling
 
and
 
blasting,
 
operating
 
supplies,
maintenance
 
and
 
repairs,
 
facilities
 
costs
 
for
 
materials
 
handling,
 
coal
 
preparation,
 
refuse
disposal,
 
coal
 
loading,
 
sampling
 
and
 
analysis
 
services,
 
reclamation
 
and
 
general
 
and
administrative costs.
 
Indirect costs
 
include statutory
 
and legally
 
agreed upon
 
fees related
to direct extraction of the mineral.
 
The indirect costs are the federal black
 
lung tax, federal
and
 
state
 
reclamation taxes,
 
property taxes,
 
local
 
transportation prior
 
to delivery
 
at rail
 
or
barge loading sites, coal production royalties, sales
 
and use taxes, income taxes and state
severance taxes.
 
Coronado’s historical costs provided a useful reference
 
for MM&A’s
 
cost
estimates.
Sales
 
revenue
 
is
 
based
 
on
 
the metallurgical
 
coal
 
price
 
information provided
 
to
 
MM&A
 
by
Coronado.
Projected debt service is excluded from the P&L and cash flow model in order to determine
Enterprise Value.
The financial model expresses
 
coal sales prices, operating costs,
 
and capital expenditures
in current day dollars without
 
adjustment for inflation.
 
Capital expenditures and reclamation
costs are
 
included based on
 
engineering estimates for
 
each mine by
 
year.
 
The Coronado
division’s existing allocations of administrative costs are continued in the future projections.
Coronado
 
will
 
pay
 
royalties
 
for
 
the various
 
current
 
and
 
projected
 
operations.
 
The royalty
rates vary by mining method and location.
 
The royalty rates for Buchanan are estimated to
be 3.0% of the sales revenue.
The projection
 
model also
 
includes consolidated
 
income tax
 
calculations at
 
the Coronado
level,
 
incorporating
 
statutory
 
depletion
 
calculations,
 
as
 
well
 
as
 
state
 
income
 
taxes,
 
and
 
a
federal
 
tax
 
rate
 
of
 
21%.
 
To
 
the
 
extent
 
the
 
mine
 
generates
 
net
 
operating
 
losses
 
for
 
tax
purposes, the
 
losses are
 
carried over
 
to offset
 
future taxable
 
income.
 
The terms
 
“cash flows”
and “project cash flows” used in this report refer to after tax cash flows.
 
 
ex962p2i0.jpg ex962p53i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
44
Consolidated
 
cash
 
flows
 
are
 
driven
 
by
 
annual
 
sales
 
tonnage,
 
which
 
at
 
steady-state
 
level
ranges
 
from
 
a
 
peak
 
of
 
4.7
 
million
 
tonnes
 
in
 
2030
 
to
 
a
 
low
 
of
 
0.8
 
million
 
tonnes
 
in
 
2047.
 
Projected consolidated
 
revenue ranges
 
from $442.2
 
million to
 
$852.6 million
 
at steady
 
state.
 
Revenue totals $14.9 billion for the project’s life.
Consolidated
 
cash
 
flow
 
from
 
operations
 
is
 
positive
 
throughout
 
the
 
projected
 
operating
period,
 
with
 
the
 
exception
 
of
 
post-production
 
years,
 
due
 
to
 
end-of-mine
 
reclamation
spending.
 
Consolidated
 
cash
 
flow
 
from
 
operations
 
peaks
 
at
 
$337.9
 
million
 
in
 
2022
 
and
totals $5.9
 
billion over
 
the project’s
 
life.
 
Capital expenditures
 
total $367.7
 
million through
2026 and $1.5 billion over the project’s life.
 
Coal price forecasts for coal products were prepared by Coronado for its active operations.
 
Such prices were used
 
for the revenue input
 
into the financial model.
 
Sales variable costs
such as production royalties and severance taxes were based upon the revenue input.
19.2
 
Results
The pre-feasibility financial model,
 
prepared by MM&A for
 
this TRS, was developed
 
to test
the economic viability
 
of each coal
 
resource area.
 
The results of
 
this financial model
 
are not
intended to
 
represent a
 
bankable feasibility
 
study,
 
as may be
 
required for
 
financing of
 
any
current or
 
future mining
 
operations contemplated
 
but are
 
intended to
 
prove the
 
economic
viability of
 
the estimated
 
coal reserves.
 
Optimization of
 
the LOM
 
plan was
 
outside the
 
scope
of the engagement.
Figure
 
19-1
 
shows
 
the
 
annual
 
variance
 
of
 
cash
 
costs
 
per
 
ton.
 
Table
 
19-1
 
shows
 
LOM
tonnage, P&L, and EBITDA for Buchanan.
Figure 19-1:
 
Cash Costs per Tonne
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
45
As shown
 
above, the
 
Buchanan Mine’s
 
average cash
 
cost ranges
 
between approximately
$66 and $96 per tonne for most of the operating period.
Table 19-1:
 
Life-of-Mine Tonnage, P&L before Tax, and EBITDA
 
LOM
LOM
P&L
LOM
EBITDA
 
Tonnes
Pre-Tax P&L
Per Tonne
EBITDA
Per Tonne
Buchanan
98,005
$5,181,446
$52.87
$7,073,988
$72.18
As shown
 
in
Table 19-1,
 
the Buchanan
 
Mine shows
 
positive EBITDA
 
over the
 
LOM.
 
Overall,
Coronado’s consolidated
 
operations show
 
positive LOM
 
P&L and
 
EBITDA of
 
$5.2 billion
 
and
$7.1
 
billion,
 
respectively.
 
A
 
summary
 
of
 
the
 
key
 
financial
 
performance
 
metrics
 
projected
through 2029 is provided below in
Table 19-2
.
Table 19-2:
 
Summary of Buchanan Key Financial Performance Metrics
 
(2022-2029)
 
 
YE
12/31
2022
YE
12/31
2023
YE
12/31
2024
YE
12/31
2025
YE
12/31
2026
YE
12/31
2027
YE
12/31
2028
YE
12/31
2029
Remaining
 
Total
LOM
Average
ROM Production Tonnes
 
168.5
 
 
7.3
 
 
7.3
 
 
7.3
 
 
7.3
 
 
9.1
 
 
7.4
 
 
7.6
 
 
7.8
 
 
6.0
 
Yield
58.16%
59.40%
52.48%
51.13%
50.55%
49.87%
58.44%
57.17%
58.65%
60.18%
Saleable Production Tonnes
*
 
98.0
 
 
4.3
 
 
3.8
 
 
3.7
 
 
3.7
 
 
4.5
 
 
4.3
 
 
4.3
 
 
4.6
 
 
3.6
 
 
Thermal Tonnes
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Domestic & Non-Asia Export Met
Tonnes
 
31.6
 
 
1.4
 
 
1.2
 
 
1.2
 
 
1.2
 
 
1.5
 
 
1.4
 
 
1.4
 
 
1.5
 
 
1.2
 
Export Met Tonnes
 
66.4
 
 
2.9
 
 
2.6
 
 
2.5
 
 
2.5
 
 
3.1
 
 
2.9
 
 
2.9
 
 
3.1
 
 
2.4
 
 
Total Saleable Tonnes
 
98.0
 
 
4.3
 
 
3.8
 
 
3.7
 
 
3.7
 
 
4.5
 
 
4.3
 
 
4.3
 
 
4.6
 
 
3.6
 
 
Cash Costs per Tonne:
Mining Costs
 
$61.03
 
 
$49.68
 
 
$53.80
 
 
$56.63
 
 
$58.66
 
 
$50.02
 
 
$52.22
 
 
$53.78
 
 
$52.19
 
 
$65.08
 
Processing and Transport
 
$8.76
 
 
$8.15
 
 
$8.00
 
 
$8.32
 
 
$8.54
 
 
$7.72
 
 
$7.55
 
 
$7.86
 
 
$7.81
 
 
$9.17
 
Sales Related Costs
 
$8.04
 
 
$10.09
 
 
$6.53
 
 
$7.04
 
 
$7.04
 
 
$6.67
 
 
$6.82
 
 
$6.96
 
 
$7.10
 
 
$8.42
 
G&A
 
$2.12
 
 
$1.55
 
 
$1.79
 
 
$1.86
 
 
$1.92
 
 
$1.62
 
 
$1.84
 
 
$1.87
 
 
$1.91
 
 
$2.29
 
 
Total Cash Costs
 
$79.95
 
 
$69.47
 
 
$70.12
 
 
$73.84
 
 
$76.16
 
 
$66.03
 
 
$68.42
 
 
$70.48
 
 
$69.01
 
 
$84.95
 
 
EBITDA per Tonne
 
$72.18
 
$127.13
 
 
$48.86
 
 
$44.28
 
 
$46.67
 
 
$59.82
 
 
$60.25
 
 
$61.06
 
 
$65.36
 
 
$75.83
 
 
Expansion CapEx ($M)
 
$-
 
 
$-
 
 
$-
 
 
$-
 
 
$-
 
 
$-
 
 
$-
 
 
$-
 
 
$-
 
 
$-
 
Maintenance CapEx ($M)
$1,472.8
 
 
$86.1
 
 
$100.5
 
 
$83.2
 
 
$56.6
 
 
$41.2
 
 
$64.3
 
 
$42.4
 
 
$43.2
 
 
$41.5
 
 
Total CapEx
$1,472.8
 
 
$86.1
 
 
$100.5
 
 
$83.2
 
 
$56.6
 
 
$41.2
 
 
$64.3
 
 
$42.4
 
 
$43.2
 
 
$41.5
 
After Tax
 
Cash Flows were developed in
 
order to calculate the NPV
 
for this Property.
 
The
NPV
 
is
 
estimated
 
to
 
be
 
$1.580
 
billion
 
at
 
a
 
discount
 
rate
 
of
 
10.0%.
 
A
 
summary
 
of
 
the
Buchanan after-tax cash flow is shown in
Table 19-3
.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
46
Table 19-3:
 
Project Cash Flow Summary (000)
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
Total
2022
2023
2024
2025
2026
Production & Sales tonnes
98,006
4,336
3,813
3,744
3,695
4,538
Total
 
Revenue
$14,909,133
$852,553
$453,707
$442,240
$453,787
$571,159
EBITDA
$7,073,988
$551,294
$186,311
$165,773
$172,414
$271,491
Net Income
$4,054,532
$377,442
$93,097
$72,548
$75,185
$145,767
Net Cash Provided by Operating Activities
$5,859,417
$337,923
$226,272
$153,087
$153,971
$213,893
Purchases of Property, Plant, and
Equipment
$(1,472,794)
$(86,124)
$(100,502)
$(83,189)
$(56,642)
$(41,201)
Net Cash Flow
$4,386,623
$251,799
$125,770
$69,897
$97,330
$172,692
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2027
2028
2029
2030
2031
2032
Production & Sales tonnes
4,336
4,317
4,563
4,743
3,952
4,271
Total
 
Revenue
$557,876
$567,848
$613,229
$651,531
$554,839
$612,889
EBITDA
$261,229
$263,595
$298,286
$329,317
$241,336
$290,107
Net Income
$137,877
$136,093
$168,482
$198,902
$134,763
$170,606
Net Cash Provided by Operating Activities
$224,239
$225,319
$245,987
$268,534
$221,190
$234,873
Purchases of Property, Plant, and
Equipment
$(64,303)
$(42,396)
$(43,244)
$(44,109)
$(69,604)
$(70,996)
Net Cash Flow
$159,936
$182,923
$202,743
$224,425
$151,586
$163,877
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2033
2034
2035
2036
2037
2038
Production & Sales tonnes
3,108
3,839
3,939
3,095
3,340
3,854
Total
 
Revenue
$455,561
$575,148
$603,143
$484,105
$533,867
$629,465
EBITDA
$171,051
$260,914
$280,917
$178,788
$209,249
$308,476
Net Income
$81,103
$150,643
$164,665
$84,421
$111,746
$188,224
Net Cash Provided by Operating Activities
$173,291
$204,491
$231,972
$176,230
$175,626
$239,334
Purchases of Property, Plant, and
Equipment
$(46,809)
$(47,745)
$(48,700)
$(76,848)
$(50,667)
$(51,681)
Net Cash Flow
$126,482
$156,746
$183,272
$99,382
$124,959
$187,653
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2039
2040
2041
2042
2043
2044
Production & Sales tonnes
4,722
4,655
3,755
3,575
3,583
3,399
Total
 
Revenue
$787,800
$793,604
$622,752
$614,673
$623,815
$595,730
EBITDA
$447,013
$443,613
$291,006
$284,502
$313,239
$288,266
Net Income
$294,103
$290,483
$171,552
$167,105
$191,132
$171,155
Net Cash Provided by Operating Activities
$337,444
$359,579
$270,111
$240,394
$255,553
$244,949
Purchases of Property, Plant, and
Equipment
$(52,714)
$(53,768)
$(82,766)
$(52,909)
$(53,968)
$(55,047)
Net Cash Flow
$284,729
$305,811
$187,345
$187,485
$201,586
$189,902
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2045
2046
2047
2048
2049
2050
Production & Sales tonnes
3,154
2,845
836
-
-
-
Total
 
Revenue
$573,015
$527,068
$157,730
$-
$-
$-
EBITDA
$271,208
$272,078
$22,517
$-
$-
$-
Net Income
$157,961
$159,633
$(32,899)
$(4,084)
$(1,660)
$(850)
Net Cash Provided by Operating Activities
$230,687
$227,781
$74,345
$(51,806)
$(17,614)
$(8,983)
Purchases of Property, Plant, and
Equipment
$(56,148)
$(40,714)
$-
$-
$-
$-
Net Cash Flow
$174,539
$187,067
$74,345
$(51,806)
$(17,614)
$(8,983)
 
 
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex962p56i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
47
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2051
2052
2053
2054
2055
2056
Production & Sales tonnes
-
-
-
-
-
-
Total
 
Revenue
$-
$-
$-
$-
$-
$-
EBITDA
$-
$-
$-
$-
$-
$-
Net Income
$(436)
$(226)
$(0)
$(0)
$(0)
$(0)
Net Cash Provided by Operating Activities
$(4,581)
$(4,673)
$-
$-
$-
$-
Purchases of Property, Plant, and
Equipment
$-
$-
$-
$-
$-
$-
Net Cash Flow
$(4,581)
$(4,673)
$-
$-
$-
$-
19.3
 
Sensitivity
Sensitivity of the NPV results to changes in
 
the key drivers is presented in the chart below.
 
The
 
sensitivity
 
study
 
shows
 
the
 
NPV
 
at
 
the
 
10.0%
 
discount
 
rate
 
when
 
Base
 
Case
 
sales
prices, operating costs, and capital costs are increased
 
and decreased in increments of 5%
within a +/- 15% range.
Figure 19-2:
 
Sensitivity of NPV
As shown, NPV
 
is quite sensitive
 
to change in
 
sales price and
 
operating cost estimates,
 
and
slightly sensitive to changes in capital cost estimates.
20
Adjacent Properties
20.1
 
Information used
No proprietary
 
information associated with
 
neighboring properties was
 
used as part
 
of this
study.
 
 
ex962p2i0.jpg
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
48
21
Other Relevant Data and Information
MM&A performed a previous audit of all the properties in year 2017
 
for Coronado based on
SEC
 
Industry
 
Guide
 
7
 
standards.
 
In
 
addition,
 
MM&A
 
completed
 
a
 
Limited
 
Phase
 
I
Environmental
 
Site
 
Assessment
 
(
ESA
)
 
on
 
the
 
Property
 
in
 
2016
 
on
 
behalf
 
of
 
Coronado.
 
MM&A conducted a Joint Ore Reserve Committee (
JORC
) compliant resource and reserve
assessment of the Buchanan
 
assets effective January 1,
 
2018.
 
By assignment, the JORC
assessment
 
included
 
a
 
preliminary
 
feasibility
 
level
 
study
 
of
 
the
 
subject
 
coal
 
reserves,
encompassing
 
detailed
 
mine
 
planning and
 
cost analysis
 
through
 
depletion of
 
Buchanan’s
JORC-compliant coal
 
reserves.
 
MM&A utilized
 
this former
 
preliminary feasibility
 
study as
the basis of an updated study which meets those standards set forth by the SEC.
22
Interpretation and Conclusions
22.1
 
Conclusion
Sufficient data have been obtained
 
through various exploration and
 
sampling programs and
mining operations to support the geological interpretations of seam structure and thickness
for coal horizons situated on the Property.
 
The data are of sufficient quantity and
 
reliability
to reasonably support the coal resource and coal reserve estimates in this TRS.
The geological data and
 
preliminary feasibility study, which consider mining
 
plans, revenue,
and operating
 
and capital
 
cost estimates
 
are sufficient
 
to support
 
the classification
 
of coal
reserves provided herein.
This
 
geologic
 
evaluation
 
conducted
 
in
 
conjunction
 
with
 
the
 
preliminary
 
feasibility
 
study
 
is
sufficient
 
to conclude
 
that the
 
98.0 Mt
 
of marketable
 
underground coal
 
reserves identified
on the Property are economically mineable
 
under reasonable expectations of market prices
for metallurgical coal products, estimated operation costs, and capital expenditures.
22.2
 
Risk Factors
Risks have been identified for operational, technical and administrative subjects addressed
in the Pre-Feasibility Study.
 
A risk matrix
 
has been constructed to
 
present the risk levels
 
for
all the risk factors identified and quantified
 
in the risk assessment process.
 
The risk matrix
and
 
risk assessment
 
process are
 
modelled according
 
to the
 
Australian and
 
New Zealand
Standard on Risk Management (AS/NZS 4360).
 
The purpose
 
of the
 
characterization of
 
the project
 
risk components is
 
to inform
 
the project
stakeholders of
 
key aspects
 
of the
 
Coronado projects
 
that can
 
be impacted
 
by events
 
whose
consequences
 
can
 
affect
 
the
 
success
 
of
 
the
 
venture.
 
The
 
significance
 
of
 
an
 
impacted
aspect
 
of
 
the
 
operation
 
is
 
directly
 
related
 
to
 
both
 
the
 
probability
 
of
 
occurrence
 
and
 
the
severity of
 
the consequences.
 
The initial
 
risk for
 
a risk
 
factor is
 
herein defined
 
as the
 
risk
level
 
after
 
the
 
potential
 
impact
 
of
 
the
 
risk
 
factor
 
is
 
addressed
 
by
 
competent
 
and
 
prudent
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
49
management utilizing
 
control measures
 
readily available.
 
Residual risk
 
for a
 
risk factor
 
is
herein
 
defined
 
as
 
the
 
risk
 
level
 
following
 
application
 
of
 
special
 
mitigation
 
measures
 
if
management determines
 
that the
 
initial risk
 
level is
 
unacceptable.
 
Initial risk
 
and residual
risk can be
 
quantified numerically,
 
derived by the
 
product of values
 
assigned to probability
and consequence ranging from very low risk to very high risk.
 
The probability and
 
consequence parameters are
 
subjective numerical estimates
 
made by
practiced mine
 
engineers and
 
managers.
 
Both are
 
assigned values
 
from 1
 
to 5
 
for which
the
 
value
 
1
 
represents
 
the
 
lowest
 
probability
 
and
 
least
 
consequence,
 
and
 
the
 
value
 
5
represents the
 
highest probability
 
and greatest
 
consequence.
 
The products,
 
which define
the Risk Level, are classified from very low to very high.
 
Risk Level Table
 
(R = P x C)
Risk Level (R)
Very Low (1 to 2)
Low (3 to 5)
Moderate (6 to 11)
High (12 to 19)
Very High (20 to 25)
Risk aspects identified and evaluated during this assignment
 
total 12.
 
No residual risks are
rated Very High.
 
One (1) residual risk is rated High.
 
Seven (7) of the risk aspects could be
associated with Moderate residual risk.
 
Four (4) of the risk
 
aspects were attributed Low
 
or
Very Low residual risks.
 
22.2.1
 
Governing Assumptions
The listing of
 
the aspects is
 
not presumed to
 
be exhaustive.
 
Instead that listing
 
is presented
based on the experiences of the contributors to the TRS.
 
1.
 
The probability and consequence ratings are subjectively assigned, and it is
assumed that this subjectivity reasonably reflects the condition of the active and
projected mine operations.
2.
 
The Control Measures shown in the matrices presented in this chapter are not
exhaustive.
 
They represent a condensed collection of activities that the author of the
risk assessment section has observed to be effective in coal mining scenarios.
 
3.
 
Mitigation Measures listed for each risk factor of the operation are not exhaustive.
 
The measures listed, however, have been observed by the author to be effective.
 
4.
 
The monetary values used in ranking the consequences are generally-accepted
quantities for the coal mining industry.
22.2.2
 
Limitations
The risk
 
assessment proposed
 
in this
 
report is
 
subject to
 
the limitations
 
of the
 
information
currently collected, tested, and interpreted at the time of the writing of this report.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
50
22.2.3
 
Methodology
The numerical quantities (i.e., risk levels) attributable to either “initial” or “residual” risks are
derived by the
 
product of values
 
assigned to probability
 
and consequence ranging
 
from very
low risk to very high risk.
R = P x C
Where:
R = Risk Level
P = Probability of Occurrence
C = Consequence of Occurrence
The Probability (P)
 
and Consequence (C)
 
parameters recited in
 
the formula are
 
subjective
numerical estimates made
 
by practiced mine
 
engineers and managers.
 
Both P and
 
C are
assigned
 
integer
 
values
 
ranging
 
from
 
1
 
to
 
5
 
for
 
which
 
the
 
value
 
1
 
represents
 
the
 
lowest
probability and
 
least consequence,
 
and the
 
value 5
 
represents the
 
highest probability
 
and
greatest consequence.
 
The products (R
 
= P x
 
C) which define
 
the Risk Level,
 
are thereafter
classified from very low to very high.
Risk Level Table
Risk Level (R)
Very Low (1 to 2)
Low (3 to 5)
Moderate (6 to 11)
High (12 to 19)
Very High (20 to 25)
Very
 
high initial risks
 
are considered to
 
be unacceptable and
 
require corrective action
 
well
in advance of project
 
development.
 
In short, measures must
 
be applied to reduce
 
very high
initial risks to a tolerable level.
 
As
 
shown
 
and
 
discussed
 
above,
 
after
 
taking
 
into
 
account
 
the
 
operational,
 
technical,
 
and
administrative actions that have been applied or are available for action when required, the
residual
 
risk
 
can
 
be
 
determined.
 
The
 
residual
 
risk
 
provides
 
a
 
basis
 
for
 
the
 
management
team
 
to
 
determine
 
if
 
the
 
residual
 
risk
 
level
 
is
 
acceptable
 
or
 
tolerable.
 
If
 
the
 
risk
 
level
 
is
determined to be unacceptable, further actions should
 
be considered to reduce the residual
risk to acceptable or tolerable levels to provide justification for continuation of the proposed
operation.
22.2.4
 
Development of the Risk Matrix
Risks
 
have
 
been
 
identified
 
for
 
the
 
technical,
 
operational,
 
and
 
administrative
 
subjects
addressed in
 
the TRS.
 
The risk
 
matrix and
 
risk assessment
 
process are
 
modelled according
to the Australian and New Zealand Standard on Risk Management (AS/NZS 4360).
 
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
51
22.2.4.1
 
Probability Level Table
Table 22-1:
 
Probability Level Table
Category
Probability Level (P)
1
Remote
Not likely to occur except in exceptional circumstances.
<10%
2
Unlikely
Not likely to occur; small in degree.
10 - 30%
3
Possible
Capable of occurring.
30 - 60%
4
Likely
High chance of occurring in most circumstances.
60 - 90%
5
Almost Certain
Event is expected under most circumstances; impossible
 
to avoid.
>90%
The
 
lowest
 
rated
 
probability
 
of
 
occurrence
 
is
 
assigned
 
the
 
value
 
of
 
1
 
and
 
described
 
as
remote,
 
with
 
a
 
likelihood
 
of
 
occurrence
 
of
 
less
 
than
 
2
 
percent.
 
Increasing
 
values
 
are
assigned to each higher probability of occurrence, culminating with the
 
value of 5 assigned
to incidents considered to be almost certain to occur.
22.2.4.2
 
Consequence Level Table
Table
 
22-2
 
lists the consequence levels.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31, 2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
52
Table 22-2:
 
Consequence Level Table
Correlation of Events in Key Elements of the
 
Project Program to Event Severity Category
Category
Severity of
the Event
Financial
Impact of the
Event
Unplanned
Loss of
Production
(Impact on
Commercial
Operations)
Events Impacting
on the
Environment
Events Affecting the
Program's Social and
Community Relations
Resultant Regulatory /
Sovereign Risk
Events Affecting Occupational Health
& Safety
1
Insignificant
< USD $0.5
million
≤ 12 hours
Insignificant loss of
habitat; no
irreversible effects
on water, soil and
the environment.
Occasional nuisance impact on
travel.
-
 
Event recurrence avoided by corrective
action through established procedures
(Engineering, guarding, training).
2
Minor
USD $0.5 million
to $2.0 million
≤ 1 day
No significant
change to species
populations; short-
term reversible
perturbation to
ecosystem function.
Persistent nuisance impact on
travel.
 
Transient adverse media
coverage.
-
 
First aid – lost time.
 
Event recurrence
avoided by corrective action through
established procedures.
3
Moderate
USD $2.0 million
to $10.0 million
≤ 1 week
Appreciable change
to species
population; medium-
term (≤10 years)
detriment to
ecosystem function.
Measurable impact on travel and
water/air quality.
 
Significant
adverse media coverage /
transient public outrage.
Uncertainty securing or
retaining essential
approval / license.
Medical Treatment –
permanent
incapacitation.
 
Avoiding event recurrence
requires modification to established
corrective action procedures
.
Change to regulations
(tax; bonds; standards).
4
Major
USD $10.0
million to $50.0
million
1 to 2 weeks
Change to species
population
threatening viability;
long-term (>10
years) detriment to
ecosystem function.
Long-term, serious impact on
travel and use of water
resources; degradation of air
quality; sustained and effective
public opposition.
Suspension / long-delay
in securing essential
approval / license.
Fatality.
 
Avoiding event recurrence
requires modification to established
corrective action procedures and staff
retraining.
Change to laws (tax;
bonds; standards).
5
Critical
>USD $50.0
million
>1 month
Species extinction;
irreversible damage
to ecosystem
function.
Loss of social license.
Withdraw / failure to
secure essential
approval / license.
Multiple fatalities.
 
Avoiding event
recurrence requires major overhaul of
policies and procedures.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
53
The lowest
 
rated consequence
 
is assigned
 
the value
 
of 1
 
and is
 
described as
 
an Insignificant
Consequence, parameters of
 
which include non-reportable
 
safety incidents with
 
zero days
lost accidents,
 
no environmental
 
damage, loss
 
of production
 
or systems
 
for less
 
than one
week and cost
 
of less than
 
USD $0.5 million.
 
Increasing values are
 
assigned to each
 
higher
consequence,
 
culminating
 
with
 
the
 
value
 
of
 
5
 
assigned
 
to
 
critical
 
consequences,
 
the
parameters of
 
which include
 
multiple-fatality accidents,
 
major environmental
 
damage, and
loss of production
 
or systems for
 
longer than one
 
month and cost
 
of greater than
 
USD $50.0
million.
Composite Risk Matrix R = P x C and Color-Code Convention
The risk level, defined
 
as the product of probability
 
of occurrence and consequence, ranges
in value
 
from 1
 
(lowest possible
 
risk) to
 
25 (maximum
 
risk level).
 
The values
 
are color-coded
to facilitate identification of the highest risk aspects.
Table 22-3:
 
Risk Matrix
P x C = R
Consequence (C)
Insignificant
Minor
Moderate
Major
Critical
1
2
3
4
5
Probability Level (P)
Remote
1
1
2
3
4
5
Unlikely
2
2
4
6
8
10
Possible
3
3
6
9
12
15
Likely
4
4
8
12
16
20
Almost
Certain
5
5
10
15
20
25
22.2.5
 
Categorization of Risk Levels and Color Code Convention
Very
 
high
 
risks
 
are
 
considered
 
to
 
be
 
unacceptable
 
and
 
require
 
corrective
 
action.
 
Risk
reduction measures must be applied to reduce very high risks to a tolerable level.
22.2.6
 
Description of the Coal Property
The Buchanan Mine
 
Complex is located
 
in Buchanan and
 
Tazewell
 
Counties, Virginia
 
and
operates
 
a
 
longwall
 
section
 
with
 
supporting
 
continuous
 
mining
 
sections.
 
Operations
 
are
projected to continue in the present mode until reserves are depleted in 2047.
22.2.7
 
Summary of Residual Risk Ratings
Each
 
risk
 
factor
 
is
 
numbered,
 
and
 
a
 
risk
 
level
 
for
 
each
 
is
 
determined
 
by
 
multiplying
 
the
assigned
 
probability
 
by
 
the
 
assigned
 
consequence.
 
The
 
risk
 
levels
 
are
 
plotted
 
on
 
a
 
risk
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
54
matrix to
 
provide a
 
composite view
 
of the
 
Coronado risk
 
profile.
 
The average
 
risk level
 
is
7.1, which is defined as Moderate.
Table 22-4:
 
Risk Assessment Matrix
 
 
 
 
 
 
 
 
 
Consequence
Critical
>$50 MM
8,9
 
 
 
 
 
Major
$10-50MM
 
 
 
6
 
 
Moderate
$2-10 MM
11
1,2,4
3
 
 
 
Minor
$0.5-$2 MM
 
 
12
5
7
 
Low
<$0.5 MM
 
 
10
 
 
 
 
<10%
10-30%
30-60%
60-90%
>90%
 
Remote
Unlikely
Possible
Likely
Almost
Certain
22.2.8
 
Risk Factors
A high-level approach is utilized
 
to characterize risk factors that
 
are generally similar across
a number
 
of the
 
active and
 
proposed mining operations.
 
Risk factors that
 
are unique
 
to a
specific operation or are particularly noteworthy are addressed individually.
22.2.8.1
 
Geological and Coal Resource
Coal
 
mining
 
is accompanied
 
by
 
risk
 
that,
 
despite
 
exploration
 
efforts,
 
mining
 
areas
 
will
 
be
encountered
 
where
 
geological
 
conditions
 
render
 
extraction
 
of
 
the
 
resource
 
to
 
be
uneconomic,
 
or
 
that
 
coal
 
quality
 
characteristics
 
disqualify
 
the
 
product
 
for
 
sale
 
into
 
target
markets.
Offsetting
 
the
 
geological
 
and
 
coal
 
resource
 
risks
 
are
 
the
 
massive
 
size
 
of
 
the
 
controlled
property which allows large areas to be mined in the preferred mine areas sufficiently away
from
 
areas
 
where
 
coal
 
quality
 
and
 
mineability
 
may
 
be
 
less
 
favorable.
 
This
 
flexibility,
combined with the extensive work done
 
to define the reserve, reduces
 
the risk at Buchanan
below that of other mine properties.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
55
Table 22-5:
 
Geological and Coal Resource Risk Assessment (Risks 1 and 2)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Recoverable coal
tonnes
recognized to be
significantly less
than previously
estimated.
Reserve base is
adequate to serve
market commitments
and respond to
opportunities for many
years.
 
Local adverse
conditions may
increase frequency and
cost of production unit
relocations.
Previous and ongoing
exploration and
extensive regional
mining history provide
a high level of
confidence of coal
seam correlation,
continuity of the coal
seams, and coal
resource tonnes.
3
4
12
Optimize mine
plan to increase
resource
recovery; develop
mine plan to
provide readily
available alternate
mining locations
to sustain
expected
production level.
2
3
6
Coal quality
locally proves to
be lower than
initially projected.
If uncontrolled,
production and sale of
coal that is out of
specification can result
in rejection of
deliveries, cancellation
of coal sales
agreements and
damage to reputation.
Exploration and vast
experience and
history in local coal
seams provide
confidence in coal
quality; limited
excursions can be
managed with careful
product segregation
and blending.
2
5
10
Develop mine
plan to provide
readily available
alternate mining
locations to
sustain expected
production level;
modify coal sales
agreements to
reflect coal
quality.
2
4
8
22.2.8.2
 
Environmental
MM&A completed a Limited Phase I
 
Environmental Site Assessment (
ESA
) on the Property
in April 2016
 
on behalf of Coronado.
 
MM&A concluded that
 
no long-term liabilities
 
existed
at the time of this ESA.
Water quality
 
and other permit
 
requirements are subject to
 
modification and such
 
changes
could have a material
 
impact on the capability
 
of the operator to
 
meet modified standards or
to receive new permits and modifications
 
to existing permits.
 
Permit protests may result in
delays or denials to permit applications.
Environmental standards and
 
permit requirements have
 
evolved significantly over
 
the past
50
 
years
 
and
 
to
 
date,
 
mining
 
operators
 
and
 
regulatory
 
bodies
 
have
 
been
 
able
 
to
 
adapt
successfully to evolving environmental requirements.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
56
Table 22-6:
 
Environmental (Risks 3 and 4)
Aspect
Impact
Control Measures
Initial Risk
Level
Mitigation Measures
Residual Risk
Level
P
C
R
P
C
R
Environmental
performance
standards are
modified in the
future.
Delays in receiving new
permits and
modifications to existing
permits; cost of testing
and treatment of water
and soils
Work with regulatory
agencies to understand
and influence final
standards; implement
testing, treatment and
other actions to comply
with new standards.
3
4
12
Modify mining and
reclamation plans to
improve compliance
with new standards
while reducing cost of
compliance.
3
3
9
New permits and
permit
modifications are
increasingly
delayed or denied.
Interruption of production
and delayed
implementation of
replacement production
from new mining areas.
Comply quickly with
testing, treatment and
other actions required;
continue excellent
compliance
performance within
existing permits.
2
4
8
Establish and maintain
close and constructive
working relationships
with regulatory
agencies, local
communities and
community action
groups.
 
Prepare and
submit permits well in
advance of needs.
 
2
3
6
22.2.8.3
 
Regulatory Requirements
Federal and state health and
 
safety regulatory agencies occasionally
 
amend mine laws and
regulations.
 
The impact
 
is industry-wide.
 
Mining operators
 
and regulatory
 
agencies have
been able to adapt successfully to evolving health and safety requirements.
Table 22-7:
 
Regulatory Requirements (Risk 5)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Federal and state
mine safety and
health regulatory
agencies amend
mine laws and
regulations.
Cost of training,
materials, supplies and
equipment; modification
of mine examination and
production procedures;
modification of mining
plans.
Participate in hearings
and workshops when
possible to facilitate
understanding and
implementation; work
cooperatively with
agencies and
employees to facilitate
implementation of new
laws and regulations.
4
3
12
Familiarity and
experience with
new laws and
regulations
results in
reduced impact
to operations and
productivity and
improved
supplies and
equipment
options.
4
2
8
22.2.8.4
 
Market and Transportation
Most
 
of
 
the
 
current
 
and
 
future
 
production
 
is
 
expected
 
to
 
be
 
directed
 
to
 
domestic
 
and
international metallurgical
 
markets.
 
Historically the
 
metallurgical markets
 
have been
 
cyclical
and highly volatile.
 
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
57
Table 22-8:
 
Market and Transportation (Risk 6)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Volatile coal prices
drop precipitously.
Loss of revenue
adversely affects
profitability; reduced cash
flow may disrupt capital
expenditures plan.
Cost control measures
implemented; capital
spending deferred.
4
5
20
High-cost
operations
closed, and
employees
temporarily
furloughed.
4
4
16
Occasional delay
 
or interruption
 
of rail,
 
river and
 
terminals service
 
may be
 
expected.
 
The
operator
 
can
 
possibly
 
minimize
 
the
 
impact
 
of
 
delays
 
by
 
being
 
a
 
preferred
 
customer
 
by
fulfilling shipment obligations promptly and maintaining close working relationships.
Table 22-9:
 
Market and Transportation (Risk 7)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Rail or river transport
is delayed; storage
and shipping access
at river and ocean
terminals is not
available.
Fulfillment of coal sales
agreements delayed;
limited coal storage at
mines may increase cost
of rehandling; production
may be temporarily idled.
Provide adequate
storage capacity at
mines; coordinate
continuously with
railroad and shipping
companies to respond
quickly and effectively
to changing
circumstances.
5
3
15
Provide back-up
storage facility
along with
personnel,
equipment and
rehandle plan to
sustain
production and
fulfill sales
obligations
timely.
5
2
10
22.2.8.5
 
Mining Plan
Occupational
 
health
 
and
 
safety
 
risks
 
are
 
inherent
 
in
 
mining
 
operations.
 
Comprehensive
training
 
and
 
retraining
 
programs,
 
internal
 
safety
 
audits
 
and
 
examinations,
 
regular
 
mine
inspections,
 
safety
 
meetings,
 
along
 
with
 
support of
 
trained
 
fire brigades
 
and
 
mine-rescue
teams are among activities that greatly reduce accident risks.
 
Employee health-monitoring
programs
 
coupled
 
with
 
dust
 
and
 
noise
 
monitoring
 
and
 
abatement
 
reduce
 
health
 
risks
 
to
miners.
 
As
 
underground
 
mines
 
are
 
developed
 
and
 
extended,
 
observation
 
of
 
geological,
hydrogeological
 
and
 
geotechnical
 
conditions
 
lead
 
to
 
modification
 
of
 
mine
 
plans
 
and
procedures to enable safe work within the mine environments.
Highlighted below
 
are selected
 
examples of
 
safety and
 
external factors
 
relevant to
 
Coronado
operations.
22.2.8.5.1 Methane Management
Coalbed
 
methane
 
is
 
present
 
in
 
coal
 
operations
 
below
 
drainage.
 
Often
 
the
 
methane
concentration
 
in
 
shallow coal
 
seams
 
is
 
at
 
such
 
low
 
levels
 
that
 
it can
 
be
 
readily
 
managed
with
 
frequent
 
testing
 
and
 
monitoring,
 
vigilance,
 
and
 
routine
 
mine
 
ventilation.
 
Very
 
high
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
58
methane
 
concentrations
 
may
 
be
 
present
 
at
 
greater
 
depths,
 
as
 
experienced
 
in
 
the
Pocahontas
 
No.
 
3
 
seam
 
at
 
Buchanan
 
Mine
 
Complex
 
in
 
Virginia.
 
High
 
methane
concentrations
 
may
 
require
 
degasification
 
of
 
the
 
coal
 
seam
 
to
 
assure
 
safe
 
mining.
 
The
Buchanan
 
Mine
 
has
 
operated
 
safely
 
for
 
many
 
years
 
in
 
one
 
of
 
the
 
most
 
intense
 
methane
environments in
 
the United
 
States through
 
careful management
 
of coal
 
seam degasification,
gob degasification and mine-ventilation procedures.
Table 22-10:
 
Methane Management (Risk 8)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Methane hazard is
present in mines
operating below
drainage.
Injury or loss of life;
possible ignition of gas
and mine explosion;
potential loss of mine and
equipment temporarily or
permanently; additional
mine fan, mine power,
ventilation, monitoring
and examination
requirements.
Low to moderate levels
can be managed with
frequent examinations,
testing and monitoring
within the mine
ventilation system.
 
Excellent rock dust
maintenance
minimizes explosion
propagation risk should
an ignition occur.
1
5
5
Very high-level
methane
concentrations
may require coal
seam
degasification
and gob
degasification if
longwall or pillar
extraction
methods are
employed.
1
5
5
22.2.8.5.2 Mine Fires
Mine fires, once common at mine operations, are rare today.
 
Most active coal miners have
not encountered
 
a mine
 
fire.
 
Vastly improved mine
 
power and
 
equipment electrical
 
systems,
along with
 
safe mine
 
practices, reduce
 
mine fire
 
risks.
 
Crew training
 
and fire
 
brigade support
and
 
training
 
improve response
 
for containment
 
and
 
control if
 
a
 
fire occurs.
 
Spontaneous
combustion
 
within
 
coal
 
mines,
 
which
 
is
 
the
 
source
 
of
 
most
 
fires
 
that
 
occur
 
today,
 
is
 
not
expected to occur at Buchanan.
 
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
59
Table 22-11
 
:
 
Mine Fires (Risk 9)
Aspect
Impact
Control Measures
Initial Risk
Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Mine fire at
underground or
surface mine
operation.
Injury or loss of life;
potential loss of mine
temporarily or
permanently; damage
to equipment and mine
infrastructure.
Inspection and
maintenance of mine
power, equipment and
mine infrastructure;
good housekeeping;
frequent examination
of conveyor belt
entries; prompt
removal of
accumulations of
combustible materials.
1
5
5
If spontaneous
combustion
conditions are
present, enhanced
monitoring and
examination
procedures will be
implemented; mine
design will
incorporate features
to facilitate isolation,
containment and
extinguishment of
spontaneous
combustion
locations.
1
5
5
22.2.8.5.3 Availability of Supplies and Equipment
The industry
 
has periodically
 
experienced difficulty receiving
 
timely delivery
 
of mine
 
supplies
and equipment.
 
Availability issues often accompanied boom periods
 
for coal demand.
 
Any
future delivery of supplies and equipment delays
 
are expected to be temporary with limited
impact on production.
Table 22-12:
 
Availability of Supplies and Equipment (Risk 10)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Disruption of
availability for
supplies and
equipment.
Temporary interruption of
production.
Force majeure
provision in coal sales
agreements to limit
liability for delayed or
lost sales.
3
2
6
Work closely with
customers to
assure delayed
coal delivery
rather than
cancelled sales;
monitor external
conditions and
increase
inventory of
critical supplies;
accelerate
delivery of
equipment when
possible.
3
1
3
22.2.8.5.4 Labor
Work stoppage
 
due to
 
labor protests
 
are considered
 
unlikely and
 
are accompanied
 
by limited
impact should
 
it occur.
 
Excellent employee
 
relations and
 
communications limit
 
the exposure
to outside protesters.
 
Loss of supervisors and skilled employees to
 
retirement is inevitable;
the impact
 
can be
 
lessened with
 
succession planning
 
and training
 
and mentorship
 
of new
employees.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex
 
in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
60
Table 22-13:
 
Labor – Work Stoppage (Risk 11)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Work stoppage due
to strikes, slowdowns
or secondary boycott
activity.
Loss of production and
coal sales; damaged
customer and employee
relations; reputation loss.
Maintain excellent
employee relations and
communications;
maintain frequent
customer
communications.
1
3
3
Develop plan for
employee
communications
and legal support
to minimize
impact of
secondary
boycott activities.
1
3
3
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
61
Table 22-14:
 
Labor – Retirement (Risk 12)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Retirement of
supervisors and
skilled employees.
Loss of leadership and
critical skills to sustain
high levels of safety,
maintenance and
productivity.
Monitor demographics
closely and maintain
communications with
employees who are
approaching retirement
age; maintain
employee selection
and training programs.
3
3
9
Maintain
selection of
candidates and
implementation
of in-house or
third-party
training for
electricians and
mechanics;
develop
employee
mentoring
program.
3
2
6
23
Recommendations
Coronado
 
is continuing
 
to
 
work both
 
internally and
 
with
 
outside
 
assistance
 
to
 
continue to
further define their resource base and to optimize the LOM plan.
24
References
Publicly
 
available
 
information
 
from
 
various
 
state
 
and
 
federal
 
agencies
 
was
 
used
 
where
relevant.
25
Reliance on Information Provided by the
Registrant
For the purpose
 
of this
 
TRS, MM&A utilized
 
the geological data
 
provided by Coronado.
 
This
information was subjected to verification of its integrity and completeness.
Historical
 
productivity
 
and
 
operating
 
costs
 
were
 
also
 
supplied
 
by
 
Coronado.
 
This
information
 
was combined
 
with the
 
experience and
 
knowledge of
 
the QPs
 
to forecast
 
the
LOM plan.
A summary of the
 
information provided by Coronado
 
relied upon by
 
MM&A for the purposes
of this TRS is provided in
Table
 
25-1
.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources
 
and Reserves for the
 
Buchanan Mine Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31,
2021
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
62
Table 25-1:
 
Information from Registrant Relied Upon by MM&A
 
Category
Information Provided by Coronado
Report
Section
Legal
Mineral control and surface control rights as shown on maps
3.2, 3.3
Geological
Geologic data including digital databases and original source
 
data
including geologist logs, driller’s logs, geophysical logs
9.1
Coal Quality
Database of coal quality information supplemented with
 
original source
laboratory sheets where available
10.1
Mining
Historical productivities and manpower from operating and future
Coronado mines
13.2, 13.4
Coal Preparation
Flow sheet and other information representing current
 
and future
methods of coal processing
 
14.1
Marketing
Long-term price forecast and market placement by seam
 
or mine used
in financial projections
16.2
Waste Disposal
Engineering data and estimates representing remaining
 
capacities for
coarse and fine coal waste disposal
17.2
Environmental
Permit and bonding information
17.3
Costs
Historical and budgetary operating cost information used to
 
derive cost
drivers for reserve financial modeling
18.2
Economic
WACC and inflation rate used in discounted
 
cash flow analysis
19.1, 19.2,
19.3
ex962p72i0.gif
 
 
APPENDIX
A
BIOGRAPHIES
ex962p73i0.jpg
 
 
 
ex962p74i0.jpg
 
 
ex962p72i0.gif
 
 
APPENDIX
B
MAP
ex962p76i0.jpg
 
 
ex962p72i0.gif
 
 
APPENDIX
C
GLOSSARY OF TERMS
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
Glossary of Abbreviations and Definitions
Abbreviation
Definition
AIPG
American Institute of Professional Geologists
ARMPS
Analysis of Retreat Mining Pillar Stability
ASTM
American Society for Testing
 
and Materials
AVS
Applicant Violator System
bcm
Bank cubic meters
Btu/lb.
British Thermal Unit per pound
CAT
®
Caterpillar Inc.
C.P.G.
Certified Professional Geologist
Carlson
Carlson Mining – formerly SurvCADD
®
 
– a prevalent software package
used for modeling in the Appalachian region
CFR
Code of Federal Regulations
Coronado
Coronado Global Resources Inc.
 
CSR
Codes of State Rules
 
CSX
CSX Corporation, a rail-based freight transportation company
CTR
Contour mining
Demonstrated
reserves
Demonstrated reserves are the sum of proven and probable reserves.
DEP
Department of Environmental Protection
EBITDA
Earnings before Interest, Taxes,
 
Depreciation, and Amortization
 
EOM
End-of-mine reclamation
EPA
United States Environmental Protection Agency
 
ESA
Limited Phase I Environmental Site Assessment
EVR
Estimated Visual Recovery
Feasibility Study
“…comprehensive technical and economic study of the selected
development option for a mineral project, which includes detailed
assessments of all applicable modifying factors together with any other
relevant operational factors, and detailed financial analysis that are
necessary to demonstrate, at the time of reporting, that extraction is
economically viable.
 
According to the proposed definition, the results of
the study may serve as the basis for a final decision by a proponent or
financial institution to proceed with, or finance, the development of the
project. Thus, a feasibility study is more comprehensive, with a higher
degree of accuracy, and yielding results with a higher level of
confidence, than a pre-feasibility study.”
 
Hitachi
Hitachi Construction Machinery Co., Ltd.
HWM
Highwall mining
In situ
Its natural position; said specific of a rock, soil, or fossil when in the
situation in which was originally formed or deposited
Indicated
Resources
Indicated
 
resources
 
are
 
those
 
lying
 
between
 
0.4-kilometer
 
and
 
1.2-
kilometer radius
 
from such
 
an observation
 
point and
 
reported herein
 
as
in-situ mineral resources.
Inferred
Resources
Inferred resources lie more than a 1.2-kilometer radius from a valid point
of
 
measurement
 
but
 
less
 
than
 
4.8
 
kilometers
 
from
 
one
 
and
 
reported
herein as in-situ mineral resources.
JORC Code
Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves
lb. SO
2
 
/ mm Btu
Pounds per sulfur dioxide per million British thermal units
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Abbreviation
Definition
LJ Hughes
LJ Hughes & Sons, Inc. - drilling Company
LOM
Life-of-mine
M&R
Maintenance and repair
M.B.A.
Master of Business Administration
Measured
Resources
Measured resources are those lying within 0.4-kilometer radius from a
valid point of measurement and reported herein as in-situ mineral
resources.
MINER Act
Mine Improvement and New Emergency Response Act of 2006
 
Mineral Reserve
“…the economically mineable part of a Measured and/or Indicated
Mineral Resource.
 
It includes dilution materials and allowances for
losses, which occur when the material is mined or extracted and is
defined by studies at Preliminary Feasibility or Feasibility level as
appropriate that include Modifying Factors.
 
Such studies demonstrate
that, at the time of reporting, extraction of the mineral reserve is
economically viable under reasonable investment and marketing
assumptions.”
 
Mineral Resource
“…a concentration or occurrence of solid material of economic interest
or on the Earth’s crust in such form, grade or quality that there are
reasonable prospects for eventual economic extraction.
 
The location,
quantity, grade, continuity and other geological characteristics and
continuity of a Mineral Resource are known, estimated or interpreted
from specific geological evidence and knowledge, including sampling.”
 
MM&A
Marshall Miller & Associates, Inc.
Modifying Factors
“…considerations used to convert Mineral Resources to Mineral
Reserves. These include, but are not restricted to, mining, processing,
metallurgical, infrastructure, economic, marketing, legal, environmental
compliance, plans, negotiations, or agreements with local individuals or
groups and governmental factors.”
MRMR
Mineral Resources to Mineral Reserves
MSHA
United States Department of Labor Mine Safety and Health
Administration
MSL
Mean sea level
Mt
Million metric tonnes
NAIP
National Agricultural Imagery Program
NIOSH
National Institute for Occupational Safety and Health
NS
Norfolk Southern Corporation, a rail-based freight transportation
company
O&M
Operating and maintenance
 
OSD
Out-of-seam dilution
OSM
U.S. Office of Surface Mining Reclamation and Enforcement
P&L
Profit and loss before tax
 
P.E.
Professional Engineer
Preliminary
Feasibility Study
“…as a comprehensive study of a range of options for the technical and
economic viability of a mineral project that has advanced to a stage
where a qualified person has determined (in the case of underground
mining) a preferred mining method, or in the case of surface mining) a
pit configuration, and in all cases has determined an effective method of
mineral processing and an effective plan to sell the product. The study’s
financial analysis must have the level of detail necessary to
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
Abbreviation
Definition
demonstrate, at the time of reporting, that extraction is economically
viable. In addition, as noted in the proposed definition of a pre-feasibility
study,
 
while a pre-feasibility study is less comprehensive and results in
a lower confidence level than a feasibility study, a pre- feasibility study
is more comprehensive and results in a higher confidence level than an
initial assessment.”
 
Property(ies)
Bituminous coal deposits located in Buchanan and Tazewell
 
Counties,
Virginia.
 
QP
Qualified Person
Qualified Person
“…a person who is a mineral industry professional with at least five
years of relevant experience in the type of mineralization and type of
deposit under consideration and in the specific type of activity that
person is undertaking on behalf of the registrant. In addition, the
proposed definition requires a qualified person to be an eligible member
or licensee in good standing of a recognized professional organization
at the
time the technical report is prepared.”
Rec.
Recovery
RECs
Recognized Environmental Conditions
Resource
Database
The Resource Database is established by the collection, validation,
recording, storing and processing of data and forms the foundation
necessary for the estimation of Mineral Resource and Mineral Reserve.
 
A quality assurance and quality control program is essential and must
be established to govern the collection of all data.
 
In reporting, a
Mineral Resource must meet the minimum requirement of “reasonable
prospects for economic extraction”. This will require the concurrent
collection and storage of preliminary economic, mining, metallurgical,
environmental, legal and social data and other information for use in the
estimation of MRMR.
 
The Resource Database will include both “primary” (observation and
measurement) and “interpreted” data. It is recommended that data be
stored digitally, using a documented,
 
standard format and a reliable
storage medium that allows for easy and complete retrieval of the data.
ROM
Run-of-mine
RPO
Recognized Professional Organizations
S-K 1300
United States Securities and Exchange Commission Regulation S-K
1300 Modernization of Property Disclosures
SEC
U.S. Securities and Exchange Commission
SME
Society for Mining Engineers
SMCRA
Surface Mining Control and Reclamation Act of 1977 is the primary
federal law that regulates the environmental effects of coal mining in the
United States.
Strip Ratio
Represented by bcm of overburden to recoverable coal tonnes
 
tph
tonnes per hour
 
TRS
Technical
 
Report Summary
USA
United States of America
USGS
United States Geologic Survey
 
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
Appendix C
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Abbreviation
Definition
VALMIN Code
Australasian Code for Public Reporting of Technical
 
Assessments and
Valuations of Mineral Assets
Vulcan™
Vulcan™ software is a product of Maptek™, a provider of software for
the global mining industry.
ex962p72i0.gif
 
 
APPENDIX
D
INITIAL ECONOMIC ASSESSMENT FOR
RESOURCES EXCLUSIVE OF RESERVES
ex962p83i0.jpg
 
 
ex962p72i0.gif
 
 
APPENDIX
E
JORC TABLE 1
 
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
>
Nature and quality of sampling (e.g. cut channels, random
 
chips, or specific
specialised industry standard measurement tools appropriate
 
to the minerals
under investigation, such as downhole gamma
 
sondes, or handheld XRF
instruments, etc.). These examples should not be
 
taken as limiting the broad
meaning of sampling.
>
Include reference to measures taken to ensure sample
 
representivity and the
appropriate calibration of any measurement tools
 
or systems used.
>
Aspects of the determination of mineralisation that are
 
Material to the Public
Report. In cases where ‘industry standard’ work has
 
been done this would be
relatively simple (e.g. ‘reverse circulation drilling
 
was used to obtain 1 m
samples from which 3 kg was pulverised to produce a
 
30 g charge for fire
assay’). In other cases, more explanation may be
 
required, such as where
there is coarse gold that has inherent sampling
 
problems. Unusual
commodities or mineralisation types (e.g. submarine nodules)
 
may warrant
disclosure of detailed information.
>
 
Most of the coal samples have been obtained
 
from the Properties by subsurface
exploration using core drilling techniques.
 
The protocol for preparing and testing
the samples has varied over time and is not well
 
documented for the older holes
drilled on the Properties.
>
 
Typical USA core drilling sampling technique is for the coal core sample,
 
once
recovered from the core barrel, to be described then wrapped
 
in a sealed plastic
sleeve and placed into a covered core box, which
 
is the length of the sample so
that the core can be delivered to a laboratory in relatively
 
intact condition and with
original moisture content.
>
 
It is reasonable to assume, given the sophistication
 
level of the previous operators,
that these samples were generally collected and processed
 
under industry best-
practices.
 
This assumption is based on MM&A’s familiarity with the operating
companies and the companies used to perform the
 
analysis.
 
>
 
Some of the drill holes were air rotary bored and
 
no coal core samples were
collected.
 
Seam thickness for rotary-drilled bore holes is
 
verified by calibrated
downhole gamma-density logs.
 
>
 
Coal samples that were deemed by MM&A geologists
 
to be unrepresentative were
not used for statistical analysis of coal quality, as documented in the
 
tabulations. A
representative group of drill hole samples from
 
the Properties were then checked
against the original drill laboratory reports to
 
verify accuracy and correctness.
 
Drilling
techniques
>
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
 
blast,
auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling
 
bit or other type, whether core is
oriented and if so, by what method, etc.).
>
 
The Properties have been extensively explored
 
by subsurface drilling efforts carried
out by numerous entities, most of which were
 
completed prior to acquisition by
Coronado.
 
The majority of the drilling was accomplished using
 
vertical continuous
(diamond) coring or air rotary methods.
>
 
Core drilling methods utilize NX-size (5.4 centimeter)
 
or similar-sized core cylinders
to recover core samples, which can be used
 
to delineate geologic characteristics,
and for coal quality testing and geotechnical logging.
 
>
 
Data for the rotary drilled holes is mainly derived
 
from downhole geophysical logs,
which are used to interpret coal and rock thickness
 
and depth since logging of the
drill cuttings is not reliable.
>
 
Geophysical logging was performed on many of
 
the holes, either by Geological
Logging Systems (a division of MM&A), other
 
geophysical logging contractors, and
on those properties acquired from CONSOL geophysical
 
logging was often
performed by CONSOL’s in-house logging services.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Criteria
JORC Code explanation
Commentary
Drill sample
recovery
>
 
Method of recording and assessing core and chip
 
sample recoveries and
results assessed.
>
 
Measures taken to maximise sample recovery and
 
ensure representative
nature of the samples.
>
 
Whether a relationship exists between sample
 
recovery and grade and
whether sample bias may have occurred due
 
to preferential loss/gain of
fine/coarse material.
>
 
Where available, core recovery thickness of coal samples
 
was reconciled with the
thickness interpreted from geophysical logs.
>
 
Core recovery of the older coal samples lacking
 
geophysical logs is sometimes not
well-documented: however,
 
when the laboratory results for such holes had
anomalous values, the data was disqualified and not
 
used.
 
Logging
>
 
Whether core and chip samples have been geologically
 
and geotechnically
logged to a level of detail to support appropriate
 
Mineral Resource estimation,
mining studies and metallurgical studies.
>
 
Whether logging is qualitative or quantitative
 
in nature. Core (or costean,
channel, etc.) photography.
>
 
The total length and percentage of the relevant
 
intersections logged.
>
 
A wide variety of core-logging techniques exist for
 
the properties.
 
For many of the
core holes, the primary data source is a generalized
 
lithology description by the
driller, in some cases supplemented by a more detailed core log
 
completed by a
geologist.
 
>
 
The logging of core thickness and depth is quantitative.
 
With the exception of the
coal seams, logging of rock strata type is more subjective
 
and best considered as
qualitative.
Sub-sampling
techniques and
sample
preparation
>
 
If core, whether cut or sawn and whether quarter, half or all
 
core taken.
>
 
If non-core, whether riffled, tube sampled, rotary split, etc.
 
and whether
sampled wet or dry.
>
 
For all sample types, the nature, quality and appropriateness
 
of the sample
preparation technique.
>
 
Quality control procedures adopted for all sub-sampling
 
stages to maximise
representivity of samples.
>
 
Measures taken to ensure that the sampling is representative
 
of the in situ
material collected, including for instance results for
 
field duplicate/second-half
sampling.
>
 
Whether sample sizes are appropriate to the grain
 
size of the material being
sampled.
>
 
Typical US practice in the Appalachian Basin is that core samples
 
for deep
mineable core samples are not sawn or subsampled (since
 
seams are not of great
thickness and the entire seam is mined and co-mingled).
>
 
Oftentimes, core for surface-mineable coal seams are
 
bench sampled separately
by the various coal and rock layers (plies).
>
 
MM&A has exercised diligence to use only those
 
analyses that are representative
of the coal quality parameters for the appropriate
 
mining type for each sample.
Quality of assay
data and
laboratory tests
>
 
The nature, quality and appropriateness of the assaying
 
and laboratory
procedures used and whether the technique is considered
 
partial or total.
>
 
For geophysical tools, spectrometers, handheld XRF
 
instruments, etc., the
parameters used in determining the analysis including
 
instrument make and
model, reading times, calibrations factors applied and
 
their derivation, etc.
>
 
Nature of quality control procedures adopted (e.g.
 
standards, blanks,
duplicates, external laboratory checks) and whether
 
acceptable levels of
accuracy (i.e. lack of bias) and precision have
 
been established.
>
 
Sample analysis was typically carried out by accredited
 
US laboratories.
 
>
 
Standard procedure upon receipt of core samples
 
by the testing laboratory is to log
the depth and thickness of the sample, then perform
 
testing as specified by a
representative of the operating company.
 
Each sample is then analyzed in
accordance with procedures defined under
American Society for Testing and
Materials (
ASTM
)
 
standards including, but not limited to; washability
 
(ASTM
D4371); ash (ASTM D3174); sulfur (ASTM D4239);
 
Btu/lb. (ASTM D5865); volatile
matter (ASTM D3175); Free Swell Index (
FSI
) (ASTM D720).
>
 
Geophysical tools are calibrated by the logging
 
company and where possible,
validated using a calibration hole.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
Criteria
JORC Code explanation
Commentary
Verification of
sampling and
assaying
>
 
The verification of significant intersections by either
 
independent or alternative
company personnel.
>
 
The use of twinned holes.
>
 
Documentation of primary data, data entry procedures,
 
data verification, data
storage (physical and electronic) protocols.
>
 
Discuss any adjustment to assay data.
>
 
All coal intersection data used to generate the geologic
 
model has been cross
referenced with the lithological and geophysical logs
 
by MM&A.
>
 
Laboratory quality was adjusted from dry basis to reflect
 
the anticipated marketable
product moisture.
>
 
Coal quality results were verified by spot-check with
 
laboratory analysis sheets by
MM&A before inclusion into the geologic model
 
and use in the resource estimate.
Location of data
points
>
 
Accuracy and quality of surveys used to locate drill
 
holes (collar and down-
hole surveys), trenches, mine workings and other
 
locations used in Mineral
Resource estimation.
>
 
Specification of the grid system used.
>
 
Quality and adequacy of topographic
 
control.
>
 
Due to the long history of exploration by various
 
parties on the Properties, a wide
variety of survey techniques exist for documentation of
 
data point locations.
 
Many
of the older exploration drill holes appear
 
to have been located by ground survey;
more recently completed drill holes are often located
 
by high-resolution Global
Positioning System (
GPS
) units.
>
 
Grid systems used are typically the State Plane Coordinate
 
System pertinent to
each property.
 
>
 
Topography is based on either the USGS topographic 7.5-minute quadrangle maps
or on recent aerial photogrammetry as necessary
 
(subject to availability).
Data spacing and
distribution
>
 
Data spacing for reporting of Exploration Results.
>
Whether the data spacing and distribution is sufficient
 
to establish the
degree of geological and grade continuity appropriate
 
for the Mineral
Resource and Ore Reserve estimation procedure(s)
 
and classifications
applied.
>
 
Whether sample compositing has been applied.
>
 
Spacing and distribution of data point information
 
may vary from seam to seam
within each mining area.
 
The areas estimated for coal resource and
 
coal reserve
tonnes have been limited so that the data spacing
 
and distribution is sufficient to
establish the degree of geological continuity appropriate
 
for the estimation and
classification of the coal tonnes.
 
>
 
All of the coal resource tonnes are in the measured,
 
indicated, and inferred
categories, and all of the coal reserve tonnes are in
 
the proved and probable
categories in accordance with the JORC Code and
 
SEC standards.
 
Orientation of
data in relation to
geological
structure
>
 
Whether the orientation of sampling achieves unbiased
 
sampling of possible
structures and the extent to which this is
 
known, considering the deposit type.
>
 
If the relationship between the drilling orientation and
 
the orientation of key
mineralised structures is considered to have introduced
 
a sampling bias, this
should be assessed and reported if material.
>
 
Drill holes have been vertically drilled.
 
No downhole deviation logs have been
collected and it is therefore not known
 
if the drill holes have deviated away from
vertical.
 
Based on the relatively shallow seam depths,
 
any deviation is expected to
be insignificant and immaterial to the geologic
 
characterization of the property.
>
 
The dip of the coal seams is relatively minor
 
and not a material issue for
representation of seam thickness or quality.
Sample security
The measures taken to ensure sample security.
>
 
Sample handling procedures employed by explorationists
 
follow typical US protocol
and should be adequate to insure sample security.
Audits or reviews
The results of any audits or reviews of
 
sampling techniques and data.
>
 
MM&A has reviewed all available geological information
 
for the Properties in
developing the geologic model.
 
Only that data deemed suitable has been used
 
for
the purpose of generating the resource and reserve
 
estimates.
 
 
ex962p2i0.jpg
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
>
 
Type, reference name/number, location and ownership including agreements
or material issues with third parties such as joint
 
ventures, partnerships,
overriding royalties, native title interests, historical
 
sites, wilderness or national
park and environmental settings.
>
 
The security of the tenure held at the time of
 
reporting along with any known
impediments to obtaining a licence to operate
 
in the area.
>
 
The Coronado coal resources are located within three
 
of the United State of
America: Virginia; West Virginia; and Pennsylvania.
 
Control of these Properties is
governed by many hundreds of agreements.
>
 
MM&A has not carried out separate title verification for
 
the coal properties and has
not verified leases, deeds, surveys or other property
 
control instruments pertinent
to the subject resources.
 
>
 
Coronado has represented to MM&A that it controls
 
the mining rights to the coal
deposits as shown on its property maps, and
 
MM&A has accepted these as being
a true and accurate depiction of the mineral rights
 
controlled by Coronado.
 
The
TRS assumes the properties are developed under
 
responsible and experienced
management.
>
 
There are no known legal or environmental encumbrances
 
that would impede
development of the subject coal reserves.
Exploration done
by other parties
>
 
Acknowledgment and appraisal of exploration by other
 
parties.
>
 
The Properties have been extensively explored
 
by subsurface drilling efforts
carried out by numerous entities, most of which
 
were completed prior to acquisition
by Coronado.
>
 
This exploration work was generally performed to
 
prevailing US best practice
standards and deemed adequate for the purposes
 
of this TRS.
 
Geology
>
 
Deposit type, geological setting and style of mineralisation.
>
 
The Coronado coal resources are located within
 
the Northern and Central
Appalachian Coal Basins.
>
 
The coal deposits are Carboniferous in age, being
 
of the Pennsylvanian system.
>
 
Seam of economic significance typically range between
 
0.3 meters and 1.8 meters
in thickness, with relatively little structural deformation.
>
 
Regional structure is typically characterized by gently
 
dipping strata to the
northwest at less than one percent.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
Criteria
JORC Code explanation
Commentary
Drill hole
Information
>
 
A summary of all information material to the understanding
 
of the exploration
results including a tabulation of the following information
 
for all Material drill
holes:
●
 
easting and northing of the drill hole collar
●
 
elevation or RL (Reduced Level – elevation above
 
sea level in metres) of
the drill hole collar
●
 
dip and azimuth of the hole
●
 
down hole length and interception depth
●
 
hole length.
>
 
If the exclusion of this information is justified on
 
the basis that the information
is not Material and this exclusion does not detract
 
from the understanding of
the report, the Competent Person should clearly explain
 
why this is the case.
>
 
MM&A reviewed and entered all pertinent data into
 
a digital geologic database for
each Coronado property.
 
The database consists
 
of thousands of data records,
which include drill hole and supplemental coal
 
seam thickness measurements from
outcrop and mine exposures.
 
>
 
All drill holes in the database are provided with
 
a collar elevation and the State
Plane Coordinate System easting and northing coordinate.
>
 
After MM&A confirmed proper coal seam thickness and
 
correlation,
 
the seam data
was modelled and compiled into coal resource maps.
>
 
The maps are provided in the TRS; however, a tabulation of the thousands
 
of
individual data records is not practical to include.
Data aggregation
methods
>
 
In reporting Exploration Results, weighting averaging
 
techniques, maximum
and/or minimum grade truncations (e.g. cutting of high
 
grades) and cut-off
grades are usually Material and should be stated.
>
 
Where aggregate intercepts incorporate short lengths of
 
high grade results
and longer lengths of low grade results, the
 
procedure used for such
aggregation should be stated and some typical examples
 
of such
aggregations should be shown in detail.
>
 
The assumptions used for any reporting of
 
metal equivalent values should be
clearly stated.
>
 
Where a coal seam has been bench sampled
 
(typically for surface mining) the
individual analyses for the coal plies are normally
 
weight-averaged to represent the
total of recoverable coal.
>
 
Coal quality summary results have been documented
 
in the TRS.
 
Average coal
quality on a per-seam basis is used to represent
 
the coal resources within a given
mining area.
>
 
Average coal quality for each Coronado complex is provided
 
in Tables 1-1, 1-2 and
1-3 of this TRS.
 
>
 
No other data aggregations methods are used.
Relationship
between
mineralisation
widths and
intercept lengths
>
 
These relationships are particularly important in the
 
reporting of Exploration
Results.
>
 
If the geometry of the mineralisation with respect
 
to the drill hole angle is
known, its nature should be reported.
>
 
If it is not known and only the down hole lengths
 
are reported, there should be
a clear statement to this effect (e.g. ‘down hole length,
 
true width not known’).
>
 
Coal thickness values from all coal intersections
 
and down hole geophysical logs
are considered to be vertical thicknesses.
 
Seam dip of approximately 2.0 to 3.0
degrees has little effect on the vertical thickness of the
 
seam.
Diagrams
>
 
Appropriate maps and sections (with scales) and tabulations
 
of intercepts
should be included for any significant discovery being reported
 
These should
include, but not be limited to a plan view of
 
drill hole collar locations and
appropriate sectional views.
>
 
Diagrams and maps showing the coal seam intercepts are
 
presented in the TRS.
Balanced
reporting
>
 
Where comprehensive reporting of all Exploration Results
 
is not practicable,
representative reporting of both low and high grades
 
and/or widths should be
practiced to avoid misleading reporting of Exploration
 
Results.
>
 
All of the available,
 
qualified exploration data has been included
 
within the
tabulations, maps, and diagrams for this TRS.
>
 
Both coal thickness and quality data are deemed
 
by MM&A to be reasonably
sufficient within the resource areas. Therefore, there is a
 
reasonable level of
confidence in the geologic interpretations required for
 
coal resource determination
based on the available data and the techniques applied
 
to the data.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
Criteria
JORC Code explanation
Commentary
Other substantive
exploration data
>
 
Other exploration data, if meaningful and material,
 
should be reported
including (but not limited to): geological observations;
 
geophysical survey
results; geochemical survey results; bulk samples
 
– size and method of
treatment; metallurgical test results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or
 
contaminating substances.
>
 
Informational material available from the U.S. Geological
 
Survey and the respective
State Surveys was used to assist in the Resource
 
estimate.
 
Further work
>
 
The nature and scale of planned further work (e.g.
 
tests for lateral extensions
or depth extensions or large-scale step-out drilling).
>
 
Diagrams clearly highlighting the areas of possible
 
extensions, including the
main geological interpretations and future drilling areas,
 
provided this
information is not commercially sensitive.
>
 
Further work is expected to include additional exploration,
 
geotechnical testing,
coal quality analyses, and coal property acquisition.
 
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
Section 3 Estimation and Reporting of Mineral Resources
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Database
integrity
>
 
Measures taken to ensure that data has not been
 
corrupted by, for
 
example,
transcription or keying errors, between its initial collection and its use for
Mineral Resource estimation
 
purposes.
>
 
Data validation procedures
 
used.
>
 
MM&A confirmed coal seam thickness and correlations in databases
 
used for coal
deposit modelling.
 
Representative records were spot-checked for
 
data entry
validation.
 
>
 
Geophysical logs were used wherever available
 
to assist in confirming the seam
correlation and to verify proper seam thickness measurements
 
and recovery of coal
samples.
Site
visits
>
 
Comment on
 
any site
 
visits undertaken
 
by the
 
Competent Person and the
outcome of those visits.
>
 
If no
 
site visits
 
have been
 
undertaken indicate why
 
this is the case.
>
 
MM&A is very familiar with the Properties and
 
has conducted multiple site visits
throughout the years.
Geological
interpretation
>
 
Confidence in (or conversely,
 
the uncertainty
 
of) the geological interpretation
 
of
the mineral deposit.
>
 
Nature of the data used and of
 
any assumptions made.
>
 
The effect,
 
if any,
 
of alternative interpretations on
 
Mineral Resource estimation.
>
 
The use of geology in guiding
 
and controlling Mineral Resource estimation.
>
 
The factors affecting continuity both
 
of grade and geology.
>
 
Due to the relative structural simplicity of the deposits
 
and the reasonable continuity
of the tabular coal beds, the principal geological
 
interpretation necessary to define
the geometry of the coal deposits is the proper
 
modeling of their thickness and
elevation.
 
>
 
Both coal thickness and quality data are deemed
 
by MM&A to be reasonable
 
within
the resource areas.
 
>
 
Therefore, there is a reasonable level of confidence
 
in the geologic interpretations
required for coal resource determination based on
 
the available data and the
techniques applied to the data.
Dimensions
>
 
The extent and variability of the Mineral Resource expressed as length (along
strike or otherwise), plan width, and depth below surface to the upper and lower
limits of the Mineral Resource.
>
 
The subject coal resource areas mostly exist in
 
discreet, individual deposits of highly
variable dimensions, shapes and depth below the
 
ground surface.
>
 
Such factors are best depicted in the maps contained
 
in the TRS.
>
 
Details of the parameters are cited within the TRS and
 
included in the table of Cut-off
Parameters listed in Section 11.1 of the TRS.
 
Estimation
and
modelling
techniques
>
 
The nature and appropriateness of the estimation technique(s) applied and key
assumptions, including treatment of extreme grade values, domaining,
interpolation parameters and maximum distance of extrapolation from data
points. If a computer assisted estimation method was chosen include a
description of computer software and
 
parameters used.
>
 
The availability of check estimates, previous estimates and/or mine production
records and whether the Mineral Resource estimate takes
 
appropriate account
of
 
such data.
>
 
The assumptions made regarding
 
recovery of by-products.
>
 
Geological data was imported into Carlson Mining
®
 
(formerly SurvCADD
®
) geological
modelling software in the form of Microsoft
®
 
Excel files incorporating, drill hole
collars, seam and thickness picks, bottom seam elevations
 
and raw and washed coal
quality. These data files were validated prior to importing into the software.
>
 
Once imported, a geologic model was created.
>
 
The geological model was verified and reviewed.
 
>
 
Resources were estimated by defining seam thickness
 
at each point of observation
and by defining resource confidence arcs around
 
the points of observation.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
9
Criteria
JORC Code explanation
Commentary
>
 
Estimation of deleterious elements or other non-grade variables of economic
significance (e.g. sulphur for acid mine drainage characterisation).
>
 
In the case
 
of block model interpolation, the
 
block size in relation to the
average sample spacing and the search employed.
>
 
Any assumptions behind modelling of
 
selective mining units.
>
 
Any assumptions about
 
correlation between variables.
>
 
Description of how the
 
geological interpretation was used to control the
resource estimates.
>
 
Discussion of basis for using or not
 
using grade cutting or capping.
>
 
The process of validation, the
 
checking process used, the comparison of model
data to drill hole data, and
 
use of reconciliation data if available.
>
 
Points of observation for Measured and Indicated
 
confidence arcs were defined for
all drill holes that intersected the seam.
 
>
 
As prescribed by the common United States
 
classification system the following
distances from points of observation were used
 
to define the corresponding
Resource category arcs:
-
 
Inferred Resources – greater than 3,960 feet (1.2
kilometers) but less than 15,840 feet (4.8 kilometers)
-
 
Indicated Resources – 3,960 feet (1.2 kilometers)
-
 
Measured Resources – 1,320 feet (0.4 kilometers)
>
 
The use of the standards commonly used in the
 
United States are appropriate and
customary for this resource jurisdiction and deposition
 
type.
>
 
MM&A performed a geostatistical analysis test
 
of the Coronado data sets using the
Drill Hole Spacing Analysis (
DHSA
) method.
>
 
Based on MM&A’s analysis, it would be possible to extend the measured,
 
indicated
and inferred arcs slightly beyond historically accepted
 
practices due to consistent
geological settings. The QP’s have elected not to extend
 
arc distances, introducing a
level of conservatism in the coal classification.
Moisture
>
 
Whether the tonnages are estimated on a dry
 
basis or with natural moisture,
and the method of determination of the moisture
 
content.
>
 
Coal resource tonnes are presented on a dry, in-situ basis.
>
 
Reserve tonnes are presented on a moist basis at anticipated
 
product moisture
ranging from 4.0 to 6.0 percent. Moisture content based
 
on historic analyses of
shipped coal.
Cut-off
Parameters
>
 
The basis of the adopted cut-off grade(s) or quality parameters
 
applied.
>
 
The cut-off parameters were tailored for each of the
 
Coronado properties to be in
accordance with mining/ processing capabilities and
 
market conditions prevalent at
each operation.
>
 
Examples include minimum recoverable coal thickness,
 
acceptable ash content and
wash recovery, and manageable overburden to coal ratio for surface mineable
 
coal.
>
 
Details of the parameters are cited within the
 
TRS and included in the table of Cut-off
Parameters listed in Section 11.1 of this TRS.
>
 
These cut-off parameters have been developed by MM&A
 
based on its experience
with the Coronado properties and other mining
 
operations of the Central Appalachian
coal basin.
 
This experience includes technical and economic
 
evaluations of
numerous properties in the region for the purposes
 
of determining the economic
viability of the subject coal reserves.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
10
Criteria
JORC Code explanation
Commentary
Mining factors or
assumptions
>
 
Assumptions made regarding possible mining methods,
 
minimum mining
dimensions and internal (or, if applicable, external) mining dilution.
 
It is always
necessary as part of the process of determining
 
reasonable prospects for
eventual economic extraction to consider potential
 
mining methods, but the
assumptions made regarding mining methods and parameters
 
when estimating
Mineral Resources may not always be rigorous.
 
Where this is the case, this
should be reported with an explanation of the
 
basis of the mining assumptions
made.
>
 
Mining factors such as dilution, mining and washing
 
recovery are variable and have
been applied at the coal deposits at each operation
 
based on site-specific
characteristics.
>
 
Details of the factors are cited within the TRS.
>
 
Factors that would typically preclude conversion of a
 
coal resource to coal reserve
include the following: inferred resource classification;
 
absence of coal quality; poor
mine recovery; lack of access; insufficient exploration; or
 
uncontrolled surface
property for areas of proposed for surface mining.
 
>
 
While such factors were used to preclude the conversion
 
of a very limited number of
coal resources to coal reserves in this report,
 
the extensive history of mining on the
Properties would suggest that there are reasonable prospects
 
for eventual economic
extractions of all coal resources under favorable
 
market conditions.
Metallurgical
factors or
assumptions
>
 
The basis for assumptions or predictions regarding
 
metallurgical amenability. It
is always necessary as part of the process of
 
determining reasonable prospects
for eventual economic extraction to consider potential
 
metallurgical methods,
but the assumptions regarding metallurgical treatment
 
processes and
parameters made when reporting Mineral Resources may
 
not always be
rigorous. Where this is the case, this should be reported
 
with an explanation of
the basis of the metallurgical assumptions made.
>
 
The products mined from coal resources controlled by
 
Coronado can be sold into
high-, mid-, and low-volatile metallurgical coal markets
 
because of their inherent
quality characteristics.
 
>
 
Run-of-mine production is washed at the coal preparation
 
plants as needed for
quality control.
 
>
 
Coronado may blend production from multiple
 
sources to manage ash and sulfur
content along with the rheological and petrographic
 
characteristics of the shipped
products.
 
Environmental
factors or
assumptions
>
 
Assumptions made regarding possible waste and
 
process residue disposal
options. It is always necessary as part of the process
 
of determining reasonable
prospects for eventual economic extraction to consider
 
the potential
environmental impacts of the mining and processing
 
operation.
 
While at this
stage the determination of potential environmental impacts,
 
particularly for a
greenfields project, may not always be well advanced,
 
the status of early
consideration of these potential environmental impacts
 
should be reported.
Where these aspects have not been considered
 
this should be reported with an
explanation of the environmental assumptions made.
>
 
MM&A completed a Limited Phase I Environmental Site
 
Assessment (ESA) on the
Buchanan property
 
in April 2016, and on the Logan County
 
and Greenbrier
Properties in May 2017 on behalf of Coronado.
 
Coronado reports not having
conducted such a study since the MM&A studies.
 
>
 
The ESAs completed by MM&A included a site inspection,
 
review of historical
records, a database search of State and Federal
 
regulatory records and interviews to
identify potential recognized environmental conditions (RECs)
 
that may create
environmental liability for the sites.
 
>
 
MM&A identified one REC at Greenbrier associated
 
with stained soil and gravel near
a fueling and maintenance area.
 
Coronado reported to MM&A that satisfactory
clean-up efforts were completed at Greenbrier.
 
>
 
Based on these former ESAs completed by MM&A,
 
it is MM&A’s opinion that
Coronado has a generally typical coal industry record
 
of compliance with applicable
mining, water quality, and environmental laws.
 
Estimated costs for mine closure,
including water quality monitoring during site reclamation,
 
are included in the TRS
financial models.
 
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
11
Criteria
JORC Code explanation
Commentary
Bulk density
>
 
Whether assumed or determined. If assumed, the
 
basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the
measurements, the nature, size and representativeness
 
of the samples.
>
 
The bulk density for bulk material must have been
 
measured by methods that
adequately account for void spaces (vugs, porosity, etc), moisture and
differences between rock and alteration zones within the deposit.
>
 
Discuss assumptions for bulk density estimates
 
used in the evaluation process
of the different materials.
>
 
Laboratory derived seam densities measured in specific
 
gravity were used where
available.
 
As needed, these data were supplemented by estimated
 
seam density
values based on the relative proportion of
 
coal and non-coal material within the seam
(typically at 1.30 and 2.25 specific gravity, respectively).
>
 
Average seam density was determined for each coal deposit
 
and used to convert
coal volumes into coal tonnage estimates.
Classification
>
 
The basis for the classification of the Mineral Resources
 
into varying confidence
categories.
>
 
Whether appropriate account has been taken
 
of all relevant factors (i.e. relative
confidence in tonnage/grade estimations, reliability
 
of input data, confidence in
continuity of geology and metal values, quality, quantity and distribution
 
of the
data).
>
 
Whether the result appropriately reflects the
 
Competent
>
 
Person’s view of the deposit.
>
 
The Resource has been classified based on suitable
 
distances from points of
observations prescribed in the common United States
 
classification system.
>
 
The use of the United States standards is appropriate and
 
customary for this
resource jurisdiction and deposition type.3
>
 
MM&A performed a geostatistical analysis test
 
of the Coronado data sets using the
Drill Hole Spacing Analysis (
DHSA
) method.
>
 
Based on MM&A’s analysis, it would be possible to extend the measured,
 
indicated
and inferred arcs slightly beyond historically accepted
 
practices due to consistent
geological settings. The QP’s have elected not to extend
 
arc distances, introducing a
level of conservatism in the coal classification.
>
 
All relevant factors have been accounted for and
 
reflect the Competent Person’s
view of the deposit.
Audits or reviews
>
 
The results of any audits or reviews of Mineral
 
Resource estimates.
>
 
MM&A completed prepared a statement of coal resources
 
and reserves for the
Properties in accordance with the JORC Code
 
as of December 31, 2017.
 
MM&A
also subsequently updated the estimate of resources
 
and reserves for depletion as
of December 31, 2018, December 31, 2019, and
 
December 31, 2020.
>
 
MM&A performed a previous audit of the Properties
 
in year 2017 for Coronado
based on U.S. Securities and Exchange Commission
 
(SEC) Industry Guide 7 and
USGS Circular 891 standards.
 
>
 
Earlier audits were performed by various independent
 
consultants for predecessors-
in-title to Coronado and at various levels of detail
 
depending on the clients concerns
and the allotted time for completion.
 
Previous audits and reviews defined the
primary coal resource areas and estimated the recoverable
 
tonnes for each seam
based on the expected mining methods.
 
>
 
Additionally, MM&A has performed proprietary evaluations for predecessors-in-title
to Coronado, which encompass portions of the Properties
 
included in this TRS.
Discussion of
relative accuracy/
confidence
>
 
Where appropriate a statement of the relative accuracy
 
and confidence level in
the Mineral Resource estimate using an approach
 
or procedure deemed
appropriate by the Competent Person. For example, the
 
application of statistical
or geostatistical procedures to quantify the relative
 
accuracy of the resource
within stated confidence limits, or, if such an approach is not deemed
>
 
The relative accuracy of and confidence in the
 
coal tonnage and quality estimates
provided herein are judged to be in conformance
 
with current industry best-practices.
>
 
The representation of average coal quality characteristics
 
should be understood to
represent a reasonably representative sampling
 
that is generally indicative of coal
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
12
Criteria
JORC Code explanation
Commentary
appropriate, a qualitative discussion of the factors that
 
could affect the relative
accuracy and confidence of the estimate.
>
 
The statement should specify whether it relates
 
to global or local estimates,
and, if local, state the relevant tonnages, which
 
should be relevant to technical
and economic evaluation. Documentation should include
 
assumptions made
and the procedures used.
>
 
These statements of relative accuracy and confidence
 
of the estimate should be
compared with production data, where available.
quality and does not represent a statistically rigorous
 
approach to coal quality
modeling.
>
 
Resource estimation has been completed using standard
 
coal estimation methods
which are deemed appropriate for this deposit.
Section 4 Estimation and Reporting of Ore Reserves
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral Resource
estimate for
conversion to Ore
Reserves
 
>
 
Description of the Mineral Resource estimate used
 
as a basis for the
conversion to an Ore Reserve.
>
 
The coal resource estimate was prepared
 
as part of the report Coronado Global
Resources Inc. Statement of Coal Resources and
 
Reserves in Accordance with
JORC Code and United States SEC Standards
 
as of December 31, 2021 –
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and
Pennsylvania, USA – February 2022 prepared
 
by MM&A.
>
 
The resource estimation criteria were developed
 
by MM&A based on the capabilities
of the mining equipment used within the production
 
model and on industry-accepted
standards to assure that the basic geologic characteristics
 
of the coal resources are
in reasonable conformity with those to be mined and
 
marketed by Coronado.
>
 
Clear statement as to whether the Mineral Resources
 
are reported additional
to, or inclusive of, the Ore Reserves.
>
 
Coal resources generally are reported inclusive of
 
the coal reserves.
 
In some
cases, resources are reported in addition to
 
coal reserves.
 
Tables 1-1 and 11
 
-3 of
the TRS clearly identify resources “inclusive of mine
 
plan” from which coal reserves
were estimated along with those resources “exclusive
 
of mine plan” from which no
reserves were estimated.
 
Site visits
 
>
 
Comment on any site visits undertaken by the
 
Competent Person and the
outcome of those visits.
>
 
MM&A is very familiar with the Properties and
 
has conducted multiple site visits
throughout the years.
Study status
 
>
 
The type and level of study undertaken to
 
enable Mineral Resources to be
converted to Ore Reserves.
>
 
A preliminary feasibility LOM plan was prepared by
 
MM&A for active and proposed
mines.
 
>
 
The Code requires that a study to at least Pre-Feasibility
 
Study level has been
undertaken to convert Mineral Resources to Ore Reserves.
 
Such studies will
have been carried out and will have determined a
 
mine plan that is technically
achievable and economically viable, and that material
 
Modifying Factors have
been considered.
>
 
This geologic evaluation conducted in accordance
 
with JORC and SEC standards
and in conjunction with the preliminary feasibility
 
study is sufficient to conclude that
the surface, highwall miner and underground
 
coal reserves identified on the
Properties are economically mineable under reasonable
 
expectations of market
prices for thermal and metallurgical coal products, estimated
 
operation costs, and
capital expenditures.
>
 
The pre-feasibility financial models, prepared by MM&A
 
for this TRS, was developed
to test the economic viability of each coal resource
 
area.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
13
Criteria
JORC Code explanation
Commentary
>
 
Proved and probable coal reserve were derived
 
from the defined in-situ coal
resource considering relevant processing, economic (including
 
independent
estimates of capital, revenue and cost, marketing, legal,
 
environmental,
socioeconomic, and regulatory factors).
Cut-off parameters
>
 
The basis of the adopted cut-off grade(s) or quality parameters
 
applied.
>
 
The cut-off parameters were tailored for each of the
 
Coronado properties to be in
accordance with mining/ processing capabilities and
 
market conditions prevalent at
each operation.
>
 
Examples include minimum recoverable coal thickness,
 
acceptable ash content and
wash recovery, and manageable overburden to coal ratio for surface mineable
 
coal.
>
 
Details of the parameters are cited within the TRS and
 
included in the table of Cut-
off Parameters listed in Section 11.1 of this TRS.
>
 
These cut-off parameters have been developed by MM&A
 
based on its experience
with the Coronado properties and are typical of
 
mining operations in the Central
Appalachian coal basin.
 
This experience includes technical and economic
evaluations of numerous properties in the region
 
for the purposes of determining the
economic viability of the subject coal reserves.
Mining factors or
assumptions
 
>
 
The method and assumptions used as reported
 
in the Pre-Feasibility or
Feasibility Study to convert the Mineral Resource to an
 
Ore Reserve (i.e. either
by application of appropriate factors by optimisation
 
or by preliminary or
detailed design).
>
 
After validating coal seam data and establishing
 
correlations, the thickness and
elevation for seams of economic interest were used
 
to generate a geologic model.
>
 
A pre-feasibility LOM plan was prepared
 
by MM&A for active and proposed mines.
 
MM&A prepared mine projections and production timing
 
forecasts based on coal
seam characteristics.
 
Production timing was carried out from 2022
 
to depletion
(exhaustion) of the coal reserve areas.
>
 
The choice, nature and appropriateness of the selected
 
mining method(s) and
other mining parameters including associated design
 
issues such as pre-strip,
access, etc.
>
 
The room-and-pillar mining method was selected to
 
model the underground mining
resources, utilizing continuous miners for coal extraction,
 
shuttle cars for production
section haulage and roof bolters for roof control,
 
with the exception that the
Buchanan Mine also uses longwall shearers, armored
 
face conveyors, and
hydraulic self-advancing roof support.
 
The resource areas located above drainage
are relatively small and often have irregular
 
boundaries.
The Buchanan Mine in
Buchanan County, Virginia is the only active longwall mine currently being operated
by Coronado.
>
 
The Coronado underground mining resource areas
 
which are located above-
drainage require an access road and mine access
 
development along the outcrop,
whereas below-drainage mines are accessed via shaft or
 
slope based on other
proposed surface infrastructure locations and/or
 
surface property control.
 
>
 
The surface mining method selected utilizes highly productive
 
hydraulic shovels,
front-end loaders, large tractors and rock trucks
 
for overburden removal.
 
The
mobile equipment spreads adapt readily to winding
 
coal outcrops for contour
surface mining and are effective for point-removal and area
 
mining applications.
>
 
Application of highwall and auger mining units
 
is an effective method to recover coal
resources not suitable for underground mining and under
 
excessive cover for
surface mining.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
14
Criteria
JORC Code explanation
Commentary
>
 
The assumptions made regarding geotechnical parameters
 
(e.g. pit slopes,
stope sizes, etc.), grade control and pre-production
 
drilling.
>
 
Mining plans for potential underground mines were
 
developed by MM&A.
 
Pillar
stability was tested by MM&A using the
Analysis of Coal Pillar Stability (ACPS
)
program that was developed by the
National Institute for Occupational Safety
and Health (
NIOSH
)
.
 
>
 
Coronado must obtain approved mining plans from
United States Department of
Labor Mine Safety and Health Administration (
MSHA
)
that define safety
parameters for the highwalls developed during
 
contour and area mining.
 
MM&A’s
planning model does not require input of specific
 
highwall design parameters, but
provides for timing of mining within mine plan polygons
 
that is representative of the
operation performance attained at Central Appalachia
 
surface mines.
>
 
Highwall and auger mining is conducted under highwalls
 
designed and constructed
to meet MSHA permit requirements.
 
To better assure highwall stability and safety
during highwall coal extraction, MSHA requires that
 
coal fenders, or stumps, be left
in place between successive cuts. Periodic barrier pillars
 
must be left in place as an
additional safeguard.
 
MM&A has adjusted the expected mining recovery
 
for
highwall and auger mining resources to reflect
 
highwall stability and safety
requirements.
>
 
The major assumptions made and Mineral Resource
 
model used for pit and
stope optimisation (if appropriate).
>
 
Underground Mining Resources:
 
For metallurgical resources, minimum coal seam
thickness extends down to between 0.6 and 1.2
 
meters and a minimum overburden
(depth of cover) of 30.5 meters.
 
A 61-meter horizontal distance is maintained from
abandoned mines and sealed or pillared areas,
 
and a 30-meter horizontal distance
is maintained from planned highwall miner panels.
 
Mine recovery is reduced when
a rider coal seam is present within a 1.5- to 3.0-meter
 
interval above the coal seam.
 
No mining is projected when the interval between
 
overlying and underlying reserves
is less than 12 meters.
>
 
Surface Mining Resources:
 
For classification as a surface-mineable resource, a
seam must be at least 0.3 meters in thickness
 
as a stand-alone (principle) seam
and 0.15 meters in thickness when less than
 
0.8 meters from a principle seam.
 
The
maximum cumulative area mining strip ratio is generally
 
20:1 for thermal coal and
30:1 for metallurgical coal.
 
Some areas were assessed for their economic viability
at higher ratios, and were included as reserves
 
if deemed economic.
 
For contour
surface mining, a minimum of 38-meter bench is
 
provided to support HWM.
>
 
HWM and Auger Mining Resources: HWM cut depth (penetration)
 
is established at
a maximum of 244 meters.
 
The minimum mineable coal thickness is limited
 
at 0.6
meters. For coal seams less than 0.8 meters
 
thick, roof and/or floor characteristics
must allow OSD cutting to maintain a 0.8-meter
 
minimum cutting height.
Auger
mining cut depth is established at an average
 
of 91 meters.
 
The minimum mineable
coal thickness is limited at 0.5 meters.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
15
Criteria
JORC Code explanation
Commentary
>
 
The mining dilution factors used.
>
 
Underground Mining Reserves:
 
The planning model assigns minimum mining
heights of 1.4 to 1.8 meters for mains and panel
 
development.
 
At the Buchanan
Mine, a minimum mining height of 1.8 meters
 
was used due to the longwall mining
method being employed.
 
For coal seams thinner than the assigned mining
 
height,
the difference between the coal seam height and assigned
 
mining height consists of
OSD.
 
In all cases a minimum of 0.05 meters of
 
OSD was assumed, with the
exception of the Mon Valley mines, where a minimum 0.15 meters of OSD was
assumed due to weaker floor strata.
>
 
Surface Mining Reserves:
 
Area mining is generally limited to a cumulative
overburden ratio of 30:1 and a 15:1 ratio for
 
contour mining.
 
Exceptions were
considered for mining of metallurgical grade coal where
 
deemed economical.
 
It is
assumed that careful cleaning of exposed coal pits will
 
result in minimal OSD.
>
 
HWM and Auger Mining Reserves:
 
The mining plan assumes that the HWM cutting
height is a minimum of 76 to 99 centimeters
 
for clearance purposes.
 
When the coal
seam is less than 76 to 99 centimeters thick, OSD
 
assumed and included in the
ROM product.
Because the auger has very limited OSD cutting ability, it is assumed
that an appropriate auger diameter will be
 
chosen based on the coal seam
thickness and that OSD will be minimal.
>
 
The mining recovery factors used.
>
 
Underground Mining Reserves:
 
Mine recovery generally varies between 40 and
 
60
percent for continuous mining panels, and 100
 
percent for longwall.
>
 
Surface Mining Reserves:
 
Mining recovery is 90 percent for virgin areas.
 
Mining
recovery is reduced where second mining is
 
projected in previously underground
and auger mined areas.
>
 
HWM and Auger Mining Reserves:
 
A mine recovery of 40 percent has been applied
for HWM.
A mine recovery of 35 percent has been
 
applied for auger mining.
>
 
Any minimum mining widths used.
>
 
Underground Mining Reserves:
 
Typical entry width is 5.8 to 6.1 meters.
>
 
The manner in which Inferred Mineral Resources
 
are utilised in mining studies
and the sensitivity of the outcome to their inclusion.
>
 
Proved and probable coal reserve were derived
 
from the defined in-situ coal
resource considering relevant processing, economic (including
 
independent
estimates of capital, revenue and cost, marketing, legal,
 
environmental,
socioeconomic, and regulatory factors).
>
 
Mine plan LOM tonnage includes inferred coal and
 
those areas that do not meet the
minimum coal thickness requirement for classification as
 
reserve.
 
Inferred coal
represents approximately 0.6% of the LOM production
 
for Mon Valley and 0.04% of
the total LOM production for Logan.
 
None of this coal was included in the estimate
of reserves
 
>
 
The infrastructure requirements of the selected mining
 
methods.
>
 
Underground Mining Resources:
 
The continuous mining method provides for the
extraction of coal from the production faces using
 
continuous miners (and longwall
shearing machine at Buchanan) and haulage using
 
shuttle cars or battery haulers to
a feeder-breaker located at the tail of the section
 
conveyor belt.
 
The feeder-breaker
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
16
Criteria
JORC Code explanation
Commentary
crushes large pieces of coal and rock and regulates
 
coal feed onto the mine
conveyor.
 
A chain conveyor is used to remove coal from
 
the longwall face at the
Buchanan Mine for placement onto the conveyor belt
 
which is ultimately delivered to
an underground storage bunker.
 
Roof-bolting machines are used to install roof
bolts, and battery scoops are available to clean the
 
mine entries and assist in
delivery of mine supplies to work areas.
 
Surface ventilation fans are installed as
needed to provide a sufficient volume of air to ventilate production
 
sections, coal
haulage and transport entries, battery charging stations,
 
and transformers in
accordance with approved plans.
>
 
Coronado currently operates three coal preparation
 
plants, one each at the
Buchanan, Logan County and Greenbrier Divisions.
 
The Buchanan Plant operates
at a feed rate of approximately 907 raw tonnes
 
per hour (
tph
), whereas the
Saunders Plant (Logan County Division) has a nominal
 
feed rate of 816 tph, and the
Mountaineer Plant (Greenbrier Division) operates
 
at 544 tph.
MM&A has included
capital estimates for construction of additional
 
coal preparation plants at the Russell
County and Mon Valley Complex for the purposes of this TRS.
 
>
 
Surface Mining Resources: The surface mining mobile equipment
 
spreads advance
the contour and area mining pits while systematically
 
reclaiming the trailing side of
pits where coal has been removed.
 
The coal haul roads are extended and
maintained as the pits advance.
 
Support facilities are maintained nearby but
 
away
from the active mining, and include storage areas
 
for blasting agents, fuel and
lubricants, and mine supplies along with maintenance
 
facilities and offices.
 
Most of
the surface mine production is transported to a loading
 
point for crushing, blending
and direct-shipment to customers.
 
>
 
HWM and Auger Resources: The HWM equipment advances
 
along with the contour
mining pits.
 
The rate of advance of the contour mining
 
is governed by the
advancement rate of the HWM.
 
A diesel-powered generator trails the highwall
miner and powers the continuous mining unit.
 
Other support facilities are provided
along with the contour mining support facilities.
 
HWM production is all transported
by truck to the coal preparation plant for washing.
Metallurgical
factors or
assumptions
 
>
 
The metallurgical process proposed and the appropriateness
 
of that process to
the style of mineralisation.
>
 
Coarse material is washed in a heavy medium
 
vessel.
 
Intermediate-size material is
washed in heavy medium cyclones.
 
Fine material is washed using conventional
froth flotation cells.
>
 
Whether the metallurgical process is well-tested technology
 
or novel in nature.
>
 
Processes are typical of those used in the
 
coal industry and are in use at adjacent
coal processing plants.
>
 
The nature, amount and representativeness of metallurgical
 
test work
undertaken, the nature of the metallurgical domaining applied
 
and the
corresponding metallurgical recovery factors applied.
>
 
The quality characteristics for the subject coal resources
 
and coal reserves have
been reviewed in detail by MM&A.
 
The drill hole data were utilized to develop
average coal quality characteristics mining site.
 
These average coal quality
characteristics were then utilized as the basis for determining
 
the various markets
into which the saleable coal will likely be placed.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
17
Criteria
JORC Code explanation
Commentary
>
 
Any assumptions or allowances made for deleterious
 
elements.
>
 
No significant effects on product quality are anticipated
 
from dilution material; float
product quality was used to model final product
 
quality.
>
 
The existence of any bulk sample or pilot scale
 
test work and the degree to
which such samples are considered representative of
 
the orebody as a whole
>
 
No bulk sample or pilot scale work has been completed.
>
 
For minerals that are defined by a specification,
 
has the ore reserve estimation
been based on the appropriate mineralogy to meet
 
specifications?
>
 
Notwithstanding the complexity of the coal quality data
 
set, the seams of the central
and northern Appalachian coalfields have a long history
 
of providing both high-Btu
thermal coals and high-, mid- and low-volatile coking
 
coals with favorable
metallurgical properties.
Environmental
 
>
 
The status of studies of potential environmental impacts
 
of the mining and
processing operation. Details of waste rock characterisation
 
and the
consideration of potential sites, status of design options
 
considered and, where
applicable, the status of approvals for process residue
 
storage and waste
dumps should be reported.
>
 
MM&A completed a Limited Phase I Environmental Site
 
Assessment (
ESA
) on the
Buchanan property
 
in April 2016, and on the Logan County
 
and Greenbrier
Properties in May 2017 on behalf of Coronado.
>
 
MM&A identified one REC at Greenbrier associated
 
with stained soil and gravel
near a fueling and maintenance area.
 
Coronado reported to MM&A that satisfactory
clean-up efforts were completed at Greenbrier.
>
 
Based on these former ESAs completed by MM&A,
 
it is MM&A’s opinion that
Coronado has a generally typical coal industry
 
record of compliance with applicable
mining, water quality, and environmental laws.
 
Estimated costs for mine closure,
including water quality monitoring during site reclamation,
 
are included in the TRS
financial models.
Infrastructure
 
>
 
The
 
existence
 
of
 
appropriate
 
infrastructure:
 
availability
 
of
 
land
 
for
 
plant
development, power,
 
water,
 
transportation (particularly
 
for bulk
 
commodities),
labour,
 
accommodation;
 
or
 
the
 
ease
 
with
 
which
 
the
 
infrastructure
 
can
 
be
provided or accessed.
>
 
Coronado currently operates one surface mine (Toney Fork Mine at the Logan Mine
Complex); Coronado also controls the idle Midland
 
Surface Mine at the Greenbrier
Mine Complex.
 
>
 
Coronado operates five underground mines as follows:
 
Buchanan Mine at the
Buchanan Mine Complex; Powellton #1, Eagle No. 1,
 
Muddy Bridge and Lower War
Eagle Mines in the Logan Mine Complex; the Mountaineer
 
#1 Mine at the
Greenbrier Mine Complex is currently idle.
>
 
All ROM production is currently planned for either
 
truck transportation from the
mines to the processing or shipping facilities, or
 
in some cases there is either a
current or planned mine mouth preparation plant and
 
barge/rail loading facility.
 
>
 
There is a network of public highways that provide
 
serviceable coal haul routes and
private, internal roads on the Properties would
 
be developed as may be needed.
 
Rail service to the Properties is most readily
 
provided by NS and CSX
with
connections to both domestic consumers and international
 
trans-shipment points.
 
NS track is located across the Monongahela
 
River from the proposed Pangburn
Hollow load-out facility.
 
Coal would be shipped to customers via barge
 
and rail and
sold as both metallurgical and thermal products.
 
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
18
Criteria
JORC Code explanation
Commentary
Costs
 
>
 
The derivation of, or assumptions made, regarding
 
projected capital costs in
the study.
>
 
The methodology used to estimate operating costs.
>
 
Coronado provided historical and 5-year budget operating
 
costs for its active mines
for MM&A’s review.
 
MM&A used the historical and/or budget cost
 
information as a
reference and developed personnel schedules for
 
each mine.
 
Hourly labor rates
and salaries were based upon information contained
 
in Coronado’s financial
summaries.
 
Fringe benefit costs were developed for vacation
 
and holidays, federal
and state unemployment insurance, retirement, workers’
 
compensation and
pneumoconiosis, casualty and life insurance, healthcare
 
and bonuses.
 
A cost factor
for mine supplies was developed that relates expenditures
 
to mine advance rates for
roof control costs and other mine supply costs at
 
underground mines.
 
Other factors
were developed for maintenance and repair costs,
 
rentals, mine power, outside
services and other direct mining costs
>
 
Surface mine direct operating costs were developed
 
as a function of overburden
ratio for repair and maintenance supplies, diesel
 
fuel, explosives and blasting, and
miscellaneous supplies and services.
 
Operating costs for highwall mines are based
on costs per ROM tonne estimates.
 
Other cost factors were developed for
 
coal
preparation plant processing, refuse handling,
 
coal loading, trucking, property taxes,
and insurance and bonding.
 
Appropriate royalty rates were assigned for production
from leased coal lands and sales taxes were calculated
 
for state severance taxes,
the federal black lung excise tax, and federal and
 
state reclamation fees.
>
 
Capital schedules were developed by MM&A for mine
 
development, infrastructure,
and on-going capital requirements for the life of
 
each projected mine.
>
 
Staffing levels were prepared and operating costs estimated
 
by MM&A for each
projected mine.
 
MM&A utilized historical cost data provided by Coronado
 
and its
own knowledge and experience to estimate direct
 
and indirect operating costs.
 
>
 
Allowances made for the content of deleterious elements.
>
 
No allowances have been made for deleterious
 
elements; no impact to quality from
deleterious elements is anticipated.
>
 
The derivation of assumptions made of metal or commodity
 
price(s), for the
principal minerals and co- products.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
>
 
Derivation of transportation charges.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
19
Criteria
JORC Code explanation
Commentary
>
 
The basis for forecasting or source of treatment and
 
refining charges, penalties
for failure to meet specification, etc.
>
 
MM&A utilized historical cost data provided by
 
Coronado and its own knowledge
and experience to estimate direct and indirect operating
 
costs.
 
All ROM production
is currently planned for either truck transportation from
 
the mines to the processing
or shipping facilities, or in some cases there is either
 
a current or planned mine
mouth preparation plant and barge/rail loading facility.
>
 
The allowances made for royalties payable, both
 
Government and private.
>
 
Appropriate royalty rates were assigned for production
 
from leased coal lands and
sales taxes were calculated for state severance taxes,
 
the federal black lung excise
tax, and federal and state reclamation fees.
Revenue factors
 
>
 
The derivation of, or assumptions made regarding
 
revenue factors including
head grade, metal or commodity price(s) exchange
 
rates, transportation and
treatment charges, penalties, net smelter returns, etc.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
>
 
The derivation of assumptions made of metal or commodity
 
price(s), for the
principal metals, minerals and co-products.
>
 
Coal sales prices as defined above.
 
All reported reserves are on a marketable
basis.
Market assessment
 
>
 
The demand, supply and stock situation for the particular
 
commodity,
consumption trends and factors likely to affect supply and
 
demand into the
future.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
>
 
A customer and competitor analysis along with the identification
 
of likely market
windows for the product.
>
 
All of the mine production serves metallurgical and thermal
 
markets.
 
The
metallurgical coal is marketed as high-volatile (typically
 
28 percent or greater volatile
matter content); mid-volatile (typically 23- to 27-percent
 
volatile matter content) and
low-volatile (typically less than 23 percent volatile
 
matter content) products.
>
 
Raw ROM production that requires washing is
 
currently processed through
Coronado owned and operated coal preparation
 
plants.
 
>
 
ROM coal that does not require further processing
 
is delivered directly to the loading
points for sizing and delivery to customers.
 
Coronado has access to two rail-loading
points serviced by the
Norfolk Southern Corporation (
NS
)
 
and two rail-loading
points serviced by
CSX Corporation (
CSX
)
.
>
 
Price and volume forecasts and the basis for these
 
forecasts.
>
 
Carlson Mining 2020
®
 
was used by MM&A to generate mine
 
plans for underground-
and surface-mineable coal seams.
 
Underground mine plans were sequenced
based on productivity schedules provided by Coronado,
 
which were based on
historically achieved productivity levels.
 
Surface mine plans were generated under
productivity assumptions (bank cubic yard per shift) as
 
provided by Coronado and
reviewed by MM&A, again based heavily on productivity
 
levels achieved by
Coronado.
 
All production forecasting ties assumed production
 
rates to geological
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
20
Criteria
JORC Code explanation
Commentary
models as constructed independently by MM&A’s team of geologists and mining
engineers.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
Economic
 
>
 
The inputs to the economic analysis to produce the
 
net present value (NPV) in
the study, the source and confidence of these economic inputs including
estimated inflation, discount rate, etc.
>
 
On an unlevered basis, the NPV of the project
 
cash flows after taxes was estimated
for the purpose of classifying coal reserves.
 
The project cash flows, excluding debt
service, are calculated by subtracting direct and indirect
 
operating expenses and
capital expenditures from revenue.
 
Direct costs include labor, drilling and blasting,
operating supplies, maintenance and repairs, facilities
 
costs for materials handling,
coal preparation, refuse disposal, coal loading, sampling
 
and analysis services,
reclamation and general and administrative costs.
 
Indirect costs include statutory
and legally agreed upon fees related to direct
 
extraction of the mineral.
 
The indirect
costs are the Federal black lung tax, Federal
 
and State reclamation taxes, property
taxes, local transportation prior to delivery at
 
rail or barge loading sites, coal
production royalties, sales and use taxes, income
 
taxes and State severance taxes.
Coronado’s historical costs provided a useful reference
 
for MM&A’s cost estimates.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward estimates
 
based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
>
 
All costs and prices are based on 2021 nominal United
 
States dollars.
>
 
A pre-feasibility LOM plan was prepared
 
by MM&A for active and proposed mines.
 
MM&A prepared mine projections and production timing
 
forecasts based on coal
seam characteristics.
 
Production timing was carried out from 2022
 
to depletion
(exhaustion) of the coal reserve areas, which is projected
 
for the year 2099.
>
 
The all-mines average cash cost ranges between approximately
 
$56 and $311 per
tonne for most of the operating period.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
21
Criteria
JORC Code explanation
Commentary
>
 
NPV ranges and sensitivity to variations in the
 
significant assumptions and
inputs.
>
 
An estimate of NPV at a base discount rate of
 
10.0% was included in Section 19 of
the TRS.
>
 
NPV of the Buchanan, Russell, Mon Valley,
 
Logan and Greenbrier Properties was
estimated to be $1.580 billion, $89.7 million, $287.3
 
million, $611.3 million and
$66.0 million, respectively.
>
 
The sensitivity study shows the NPV at the 10.0%
 
discount rate when Base Case
sales prices, operating costs, and capital costs are
 
increased and decreased in
increments of 5% within a +/- 15% range.
 
Social
 
>
 
The status of agreements with key stakeholders
 
and matters leading to social
license to operate.
>
 
Portions of the properties are located near
 
local communities.
 
Regulations prohibit
mining activities within 91 meters of a residential
 
dwelling, school, church, or similar
structure unless written consent is first obtained from
 
the owner of the structure.
 
Where required, such consents have been obtained
 
where mining is proposed
beyond the regulatory limits.
Other
 
To the extent relevant, the impact of the following on the project and/or on the
estimation and classification of the Ore Reserves:
>
 
Any identified material naturally occurring risks.
>
 
No material naturally occurring risks have been
 
identified.
>
 
The status of material legal agreements and marketing
 
arrangements.
>
 
The Coronado coal resources are located in Buchanan,
 
Russell and Tazewell
Counties, Virginia; Greenbrier, Logan, Boone, Wyoming and Greenbrier Counties,
West Virginia; Allegheny, Washington and Westmoreland Counties, Pennsylvania.
>
 
MM&A has not carried out separate title verification for
 
the coal properties and has
not verified leases, deeds, surveys or other property
 
control instruments pertinent to
the subject resources.
>
 
Coronado has represented to MM&A that it controls
 
the mining rights to the reserves
as shown on its property maps, and MM&A
 
has accepted these as being a true and
accurate depiction of the mineral rights controlled by
 
Coronado.
 
The TRS assumes
the properties are developed under responsible and
 
experienced management.
>
 
The status of government agreements and approvals
 
critical to the viability of
the project, such as mineral tenement status and
 
government and statutory
approvals. There must be reasonable grounds
 
to expect that all necessary
Government approvals will be received within
 
the timeframes anticipated in the
Pre-Feasibility or Feasibility study. Highlight and discuss the materiality of any
unresolved matter that is dependent on a third part
 
on which extraction of the
reserve is contingent.
>
 
Coronado has obtained all mining and discharge permits
 
to operate 34 underground
mines, 13 surface mines, and 18 processing, loadout
 
or related facilities.
 
MM&A is
unaware of any obvious or current Coronado
 
permitting issues that are expected to
prevent the issuance of future permits.
 
Coronado, along with all Central and
Northern Appalachian basin coal producers, is
 
subject to a level of uncertainty
regarding future clean water permits due to
United States Environmental
Protection Agency
(
EPA
)
 
involvement with state programs.
Classification
 
>
 
The basis for the classification of the Ore Reserves
 
into varying confidence
categories. Whether the result appropriately reflects
 
the Competent Person’s
view of the deposit. The proportion of Probable
 
Ore Reserves that have been
derived from Measured Mineral Resources (if
 
any).
>
 
Measured and indicated resources have been
 
converted to proved and probable
reserves, respectively.
>
 
None of the probable coal reserves have been
 
derived from measured resources.
>
 
In a limited number of cases where there was
 
only very limited data available to
demonstrate the metallurgical suitability of a given
 
coal deposit, that deposit was
classified as a probable reserve instead of a
 
proved reserve.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
22
Criteria
JORC Code explanation
Commentary
>
 
The results of this TRS define an estimated total
 
initial ROM recoverable ore (coal)
reserve estimate of 556 million tonnes for Coronado
 
as follows:
a)
 
Buchanan =
 
160 Mt
b)
 
Logan
 
=
 
137 Mt
c)
 
Greenbrier=
 
12 Mt
d)
 
Russell =
 
50 Mt
e)
 
Mon Valley =
 
197 Mt
 
>
 
Coronado controls a total of 342 Mt (moist basis)
 
of marketable coal reserves for
Coronado as of December 31, 2021.
 
Of that total, 72 percent are proved, and
 
28
percent are probable.
 
Total reserves by complex are as follows:
a)
 
Buchanan =
 
98 Mt
b)
 
Logan
 
=
 
73 Mt
c)
 
Greenbrier=
 
7 Mt
d)
 
Russell =
 
30 Mt
e)
 
Mon Valley =
 
134 Mt
 
Audits or reviews
>
 
The results of any audits or reviews of Ore
 
Reserve estimates.
>
 
MM&A completed prepared a statement of coal resources
 
and reserves for the
Properties in accordance with the JORC Code
 
as of December 31, 2017.
 
MM&A
also subsequently updated the estimate of resources and
 
reserves for depletion as
of December 31, 2018, December 31, 2019, and
 
December 31, 2020.
>
 
MM&A performed a previous audit of the Properties
 
in year 2017 for Coronado
based on
U.S. Securities and Exchange Commission (
SEC
)
 
Industry Guide 7
standards.
 
Earlier audits were performed by various
 
independent consultants for
predecessors-in-title to Coronado and at various
 
levels of detail depending on the
clients concerns and the allotted time for completion.
 
Previous audits and reviews
defined the primary coal resource areas and estimated
 
the recoverable tonnes for
each seam based on the expected mining methods.
>
 
Additionally, MM&A has performed proprietary evaluations for predecessors-in-title
to Coronado, which encompass portions of the Properties
 
included in this TRS.
Discussion of
relative accuracy/
confidence
 
>
 
Where appropriate a statement of the relative accuracy
 
and confidence level in
the Ore Reserve estimate using an approach
 
or procedure deemed appropriate
by the Competent Person. For example, the application
 
of statistical or
geostatistical procedures to quantify the relative accuracy
 
of the reserve within
stated confidence limits, or, if such an approach is not deemed
 
appropriate, a
qualitative discussion of the factors which could affect the relative
 
accuracy
and confidence of the estimate.
>
 
Operations on the Properties by Coronado and
 
its predecessors have been on-
going for many years.
 
>
 
MM&A is confident that the mine plans and
 
financial models are reasonably
representative to provide an accurate estimation of
 
coal reserves.
>
 
Mine development and operation have not been optimized
 
within the TRS.
>
 
The statement should specify whether it relates
 
to global or local estimates,
and, if local, state the relevant tonnages, which
 
should be relevant to technical
and economic evaluation. Documentation should include
 
assumptions made
and the procedures used.
>
 
Proved and probable coal reserve were derived
 
from the defined in-situ coal
resource considering relevant processing, economic (including
 
independent
estimates of capital, revenue and cost), marketing, legal,
 
environmental,
socioeconomic, and regulatory factors on a global
 
scale as current local data
reflects the global assumptions.
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
23
Criteria
JORC Code explanation
Commentary
>
 
Accuracy and confidence discussions should extend to
 
specific discussions of
any applied Modifying Factors that may have
 
a material impact on Ore Reserve
viability, or for which there are remaining areas of uncertainty at the current
study stage.
The major risk factors for the active Coronado
 
mines and future resource development
are summarized below:
>
 
Mine Accidents
>
 
Highwall Failure.
 
Highwall failures are likely to result in
 
a temporary mine closure
and should not have a material impact on the
 
mine sustainability.
 
The risk is
considered to be probable.
 
>
 
Adverse Geological Conditions.
 
Adverse geological conditions include such
conditions as faults and sandstone washes.
 
The risk is considered to be probable.
 
The impact is expected to be temporary with
 
little material impact on mine
sustainability.
>
 
Environmental Risk.
 
Numerous federal and state permits are required
 
to operate
coal mines and mine surface facilities. Permitting rules
 
are complex and may
change over time, making compliance difficult or impossible.
>
 
Water Quality.
 
Permit requirements to fulfill Clean Water Act obligations are
 
subject
to modification.
 
The probability of water quality changes having
 
a material impact
on mine operations is possible.
 
As a contemporary example, the selenium
discharge issue that affects western Canadian and Central
 
Appalachian Basin
operators has only recently emerged as a concern
 
and its ultimate impact has not
been determined.
>
 
New Permits.
 
Permit protests by environmental groups and
 
individuals can
contribute to permit delays or denial and increase
 
the cost of permitting and delay
development.
 
Surface mining activities, coal refuse disposal and
 
construction of
access roads in mountainous terrain often require
 
storage of material in valley fills.
 
Authority to dispose of fill material into waters of
 
the United States must be granted
by the
United States Army Corps of Engineers
 
(
COE
)
.
 
COE permits are
increasingly difficult to obtain.
>
 
Regulatory Requirements.
 
Adverse impact from regulatory changes is
 
considered
to be probable.
 
The impact will likely affect the broader industry
 
and is not expected
to result in mine closure.
>
 
Market Risk.
 
Metallurgical and thermal coal markets ultimately depend
 
upon the
global steel and thermal coal demand and are
 
considered to be volatile.
 
Currently,
the US coal market has seen a decline
 
in demand for thermal coal due to thermal
plant closures, as a result of new air and
 
water pollution regulations, and
competition from other commodities used for power
 
generation such as natural gas.
 
This has resulted in an overall decline in CAPP
 
coal production.
 
Continued
regulatory changes and declining demand could result in
 
material changes in
domestic and global coal markets.
 
The impact cannot be predicted at this time;
however, while MM&A expects the coal reserve within this TRS to
 
remain
economically viable throughout the life of the projected
 
mines, the LOM financial
model is very sensitive to changes in coal sales
 
price and therefore market risk is
not insignificant.
>
 
Labor Risk.
 
Work stoppage due to organized labor protests
 
is considered to be
unlikely and not likely to lead to permanent mine
 
closure.
 
The mines are likely to
 
 
ex962p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
24
Criteria
JORC Code explanation
Commentary
suffer the loss of key supervisors and skilled employees
 
due to retirement as the
workforce ages.
 
The problem is industry-wide and the impact
 
is expected to be
temporary and have no sustained impact on
 
coal production.
>
 
Availability of Equipment and Supplies.
 
Risk of equipment and supply availability is
likely to be temporary and should not have a sustained
 
adverse impact on the
production of coal.
>
 
Transportation Delay.
 
Interruption of coal transport services by river
 
or rail is
considered to be probable but unlikely to have a
 
sustained impact on coal
production.
>
 
It is recognised that this may not be possible or appropriate
 
in all
circumstances. These statements of relative accuracy and
 
confidence of the
estimate should be compared with production data,
 
where available.
>
 
Mine plans, productivity expectations and cost estimates
 
generally reflect historical
performance and efforts have been made to adjust plans
 
and costs to reflect future
conditions.
ex963p1i0.jpg
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300
 
as of December
31, 2021
Central Appalachian Coal Basin
West Virginia, USA
February 2022
Prepared for:
Coronado Global Resources Inc.
 
100 Bill Baker Way
 
Beckley, West
 
Virginia 25801
Prepared by:
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
582 Industrial Park Road
Bluefield, Virginia
 
24605
www.mma1.com
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
Statement of Use and Preparation
This Technical
 
Report Summary (
TRS
) was prepared by
Marshall Miller & Associates, Inc.
(
MM&A
)
 
for the sole
 
use of
Coronado Global Resources
 
Inc. (
Coronado
)
and its affiliated
and
 
subsidiary
 
companies
 
and
 
advisors.
 
Copies
 
or
 
references
 
to
 
information
 
in
 
this
 
report
may not be used without the written permission of Coronado.
This report provides
 
a statement
 
of coal resources
 
and coal reserves
 
for Coronado, as
 
defined
under
 
the
Australasian Code
 
for
 
Reporting of
 
Exploration
 
Results, Mineral
 
Resources
and
 
Ore
 
Reserves
(
JORC
 
Code
)
 
as
 
well
 
as
 
under
 
Subpart
 
1300
 
of
 
Regulation
 
S-K
(Regulation
 
S-K
 
1300)
 
promulgated
 
by
the
United
 
States
 
Securities
 
and
 
Exchange
Commission
 
(
SEC
)
.
 
Subject
 
to
 
the
 
comments
 
below,
 
this
 
report
 
was
 
also
 
prepared
 
in
accordance with
 
the
Australasian Code for
 
Public Reporting
 
of Technical
 
Assessments
and Valuations of Mineral Assets
(
VALMIN Code
).
 
The
 
statement
 
is
 
based
 
on
 
information
 
provided
 
by
 
Coronado
 
and
 
reviewed
 
by
 
John
 
W.
Eckman, CPG; and Justin S. Douthat, PE, MBA.
As
 
noted
 
above,
 
this
 
report
 
is
 
a
 
“Public
 
Report”
 
for
 
the
 
purposes
 
of
 
the
 
VALMIN
 
Code.
 
However,
 
in accordance with paragraph 12.1
 
of the VALMIN
 
Code, it is noted
 
that this report
is
 
not
 
a
 
“Valuation
 
of
 
Mineral
 
Assets”,
 
and
 
it
 
also
 
does
 
not
 
comply
 
with
 
the
 
following
requirements that apply to “Technical
 
Assessments” (as defined in the VALMIN Code):
This report does not include a determination of the status of tenure (as required by
paragraph 7.2 of the VALMIN Code) on the basis that tenure was separately reviewed by
Coronado’s legal advisors.
This report does
 
not include
 
separate commentary on
 
the reasonableness and
 
quality of the
Resources
 
and
 
Reserves
 
estimates
 
and
 
the
 
basis
 
on
 
which
 
they
 
have
 
been
 
reported
 
(as
required
 
by
 
paragraph
 
7.3
 
of
 
the
 
VALMIN
 
Code).
 
MM&A
 
did
 
not
 
consider
 
that
 
this
 
was
appropriate in circumstances
 
where MM&A was
 
engaged for the
 
specific purpose of
 
preparing
those estimates
 
and the
 
Resource estimates
 
were prepared
 
by John
 
Eckman and
 
the Reserve
estimates were prepared
 
by Justin
 
Douthat, both
 
of whom
 
are authors
 
of this
 
report.
 
However,
MM&A notes that, in
 
accordance with its
 
usual practice, a separate
 
team of MM&A
 
employees
undertook
 
a
 
peer
 
review of
 
this
 
report
 
and
 
confirmed
 
that
 
both
 
the process
 
followed
 
by
 
the
authors
 
of
 
this
 
report
 
and
 
the
 
estimates
 
prepared
 
were
 
reasonable
 
and
 
comply
 
with
 
the
requirements of the JORC Code.
 
Justin Douthat
 
is a
 
licensed Professional
 
Engineers and
 
Registered Member
 
of the
Society
of Mining Engineers (
SME
)
, Golden, Colorado, USA.
 
John Eckman is
 
a Registered Member
of
 
the
American
 
Institute
 
of
 
Professional
 
Geologists
(
AIPG
)
.
 
SME
 
and
 
AIPG
 
are
Recognized Professional Organizations (
RPOs
)
.
 
Both are full-time employees of Marshall
Miller & Associates, Inc. and recognized as a
Qualified Persons
(
QPs
).
The
 
information
 
in
 
this
 
TRS
 
related
 
to
 
coal
 
resources
 
and
 
reserves
 
is
 
based
 
on,
 
and
 
fairly
represents,
 
information
 
compiled
 
by
 
the
 
QPs.
 
At
 
the
 
time
 
of
 
reporting,
 
MM&A’s
 
QPs
 
have
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
sufficient
 
experience
 
relevant
 
to
 
the
 
style
 
of
 
mineralization
 
and
 
type
 
of
 
deposit
 
under
consideration and to
 
the activity
 
they are undertaking
 
to qualify
 
as a
 
QP as defined
 
by the SEC
and the
 
JORC Code.
 
Each QP
 
consents to
 
the inclusion
 
in this
 
report of
 
the matters
 
based
on their information in the form and context in which it appears.
Marshall
 
Miller &
 
Associates,
 
Inc. (
MM&A
)
 
hereby
 
consents to
 
the use
 
of the
 
information
contained in this report dated December 31,
 
2021, relating to estimates of coal resources
 
and
coal reserves controlled by Coronado.
 
 
 
 
ex963p2i0.jpg
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
This report was prepared by:
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
/s/ John W. Eckman
February 18, 2022
John W. Eckman, CPG
Senior Geologist
Direct Line: +1 304 809 0664
Email:
 
john.eckman@mma1.com
 
Date of Signature
/s/ Justin S. Douthat
February 18, 2022
Justin S. Douthat, PE, MBA
Executive Vice President
Direct Line: +1 304 809 0597
Email:
 
justin.douthat@mma1.com
Date of Signature
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
Table
 
of Contents
1
1
1.1
1
1.2
2
1.3
3
1.4
3
1.5
3
1.6
4
1.7
4
1.8
5
1.9
5
1.10
7
1.10.1
10
1.10.2
10
1.11
11
1.12
11
2
12
2.1
12
2.2
12
2.3
13
3
13
3.1
13
3.2
13
3.3
13
3.4
14
3.5
14
4
15
4.1
15
4.2
15
4.3
15
4.4
15
4.5
16
5
16
5.1
16
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
13
36
13.1
36
13.2
36
13.3
37
13.3.1
37
13.3.2
37
13.3.3
38
13.4
38
13.4.1
38
13.4.2
45
14
48
14.1
36
14.2
36
15
49
16
50
16.1
50
16.2
51
16.3
52
17
52
17.1
52
17.2
52
17.3
52
17.4
55
17.5
55
17.6
55
18
55
18.1
56
18.2
56
19
57
19.1
57
19.2
63
19.3
63
20
64
20.1
Information Used
64
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
21
64
22
64
22.1
Conclusion
64
22.2
Risk Factors
64
22.2.1
Governing Assumptions
65
22.2.2
Limitations
66
22.2.3
Methodology
66
22.2.4
Development of the Risk Matrix
67
22.2.5
Categorization of Risk Levels and Color Code Convention
69
22.2.6
Description of the Coal Property
69
22.2.7
Summary of Residual Risk Ratings
70
22.2.8
Risk Factors
70
23
77
24
77
25
77
Figures (in Report)
2
5
6
11
18
20
28
28
29
30
32
50
57
60
63
Tables
 
(in Report)
4
4
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
5
7
9
26
30
31
32
35
35
464
6
47
48
51
54
57
57
60
61
62
67
68
69
70
71
72
72
73
73
74
75
75
76
76
77
78
Appendices
A
B
C
D
E
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
1
Executive Summary
1.1
 
Property Description
Coronado Global
 
Resources Inc.
 
(
Coronado
)
authorized Marshall
 
Miller &
 
Associates,
Inc. (
MM&A
)
 
to prepare this
 
Technical Report Summary (TRS) of its
 
controlled coal resources
and reserves located at
 
the
Logan County Complex
 
(
Logan
)
 
in Boone, Logan and
 
Wyoming
Counties, West Virginia (the
Property
).
 
The report provides
 
a statement of
 
coal resources
 
and
coal
 
reserves
 
for
 
Coronado,
 
as
 
defined
 
under
 
the
Australasian
 
Code
 
for
 
Reporting
 
of
Exploration Results,
 
Mineral Resources and
 
Ore Reserves
(
JORC Code
) as well
 
as under
Subpart
 
1300
 
of
 
Regulation
 
S-K
 
(Regulation
 
S-K
 
1300)
 
promulgated
 
by
 
the
United
 
States
Securities and
 
Exchange Commission
 
(
SEC
)
.
 
This report
 
was also
 
prepared in
 
accordance
with
 
the
Australasian
 
Code
 
for
 
Public
 
Reporting
 
of
 
Technical
 
Assessments
 
and
Valuations of Mineral Assets
(
VALMIN Code
).
Coal resources and coal reserves are herein
 
reported in metric units of measurement and
 
are
rounded to millions of metric tonnes (
Mt
).
Surface facilities for
 
the operations are
 
located along Buffalo
 
Creek and a
CSX Corporation
(
CSX
)
 
rail
 
line
 
about
 
21
 
kilometers
 
north-northeast
 
of
 
Man,
 
West
 
Virginia
 
(see
Figure
 
1-1
).
 
The Property
 
is composed
 
of 13,138
 
total hectares,
 
13,069 of
 
which are
 
leased from
 
private
landholders
 
under
 
approximately
 
15
 
individual
 
leases,
 
and
 
69
 
hectares
 
are
 
owned
 
by
Coronado.
 
Subject
 
to
 
Coronado
 
exercising
 
its
 
renewal
 
rights
 
thereunder,
 
a
 
majority
 
of
 
the
leases, covering a majority
 
of the Logan reserves, expire
 
upon exhaustion of the
 
relevant coal
reserves, which is expected to
 
occur in 2053.
 
One lease expires in
 
2032; however, Coronado
is projected to have previously exhausted the reserves covered thereby.
 
 
ex963p2i0.jpg ex963p11i1.jpg
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Figure 1-1:
 
Coronado Logan Property Location Map
1.2
 
Ownership
The Logan
 
properties started
 
mining in
 
1945 by
Lorado Mining
 
Company
.
 
The properties
were
 
sold
 
to
Buffalo
 
Mining
 
Company
 
in
 
1964
 
and
 
then
 
to
Pittston
 
Coal
 
Company
(
Pittston
)
 
in
 
1971.
 
Pittston
 
operated
 
the
 
properties
 
until
 
the
 
early
 
1990’s
 
when
 
it
 
idled
 
the
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
mine complex and then sold them to
Addington Resources
 
in 2004.
 
Production resumed in
2005.
 
Imagin
 
Natural
 
Resources
 
acquired
 
the
 
properties
 
in
 
2007
 
and
 
sold
 
to
Cleveland-
Cliffs Inc. (
Cliffs
)
 
in 2011, which in turn sold the properties to Coronado in 2014.
1.3
 
Geology
Operations at the Logan Mine Complex extract multiple coal seams by both underground and
surface
 
mining
 
methods.
 
The
 
coal-bearing
 
formation
 
of
 
interest
 
at
 
Logan
 
is
 
primarily
 
the
Kanawha Formation, which
 
comprises a major
 
portion of the
 
exposed ridges.
 
The Kanawha
Formation is a coal
 
bearing sequence of sandstones,
 
siltstones, shales, and mudstones
 
with
minor occurrences of siderite, limestone and flint clay.
Coronado
mines several horizons
 
within the Kanawha
 
formation.
 
The horizons are
 
as follows:
 
Buffalo Creek, Upper Clarion Rider, Clarion, Lower Clarion,
 
Upper Stockton, Lower Stockton,
Upper Coalburg, Lower Coalburg, Lower Dorothy, Upper Winifrede, Lower Winifrede,
 
Chilton-
A,
 
Chilton,
 
Upper
 
Cedar
 
Grove,
 
Middle
 
Cedar
 
Grove,
 
Lower
 
Cedar
 
Grove,
 
2
 
Gas,
 
Upper
Powellton, Lower Powellton, Eagle, and Lower War Eagle.
1.4
 
Exploration Status
The
 
Property
 
has
 
been
 
extensively
 
explored,
 
largely
 
by
 
drilling
 
using
 
continuous
 
coring
methods,
 
rotary
 
drilling
 
but
 
also
 
by
 
obtaining
 
coal
 
measurements
 
at
 
mine
 
exposures.
 
The
majority of
 
the data
 
was acquired
 
or generated
 
by previous
 
owners of
 
the Property.
 
These
sources
 
comprise
 
the
 
primary
 
data
 
used
 
in
 
the
 
evaluation
 
of
 
the
 
coal
 
resources
 
and
 
coal
reserves
 
on
 
the
 
Property.
 
MM&A
 
examined
 
the
 
data
 
available
 
for
 
the
 
evaluation
 
and
incorporated all
 
pertinent information
 
into this
 
TRS.
 
Where data
 
appeared to
 
be anomalous
or
 
not
 
representative,
 
that
 
data
 
was
 
excluded
 
from
 
the
 
digital
 
databases
 
and
 
subsequent
processing by MM&A.
 
Ongoing exploration
 
has been
 
carried out
 
by Coronado
 
since acquiring
 
the Logan
 
Complex.
 
The Coronado acquired exploration data has been consistent with past drilling activities.
1.5
 
Operations and Development
As of December 31, 2021, underground
 
mine operations were active at the Lower
 
War Eagle,
Eagle
 
No.
 
1
 
and
 
Muddy
 
Bridge
 
Mines
 
with
 
three,
 
three
 
or
 
two
 
active
 
mining
 
sections,
respectively using the room-and-pillar
 
method.
 
In addition, Coronado operates
 
a single active
underground
 
room-and-pillar
 
section
 
in
 
the
 
Powellton
 
No.
 
1
 
Mine.
 
Annual
 
deep
 
mine
production peaks at approximately 2.5
 
Mt in 2027.
 
One active surface mine, Toney Fork, was
also
 
operating.
 
Surface
 
production
 
is
 
projected
 
to
 
peak
 
at
 
1.4
 
Mt
 
in
 
2034.
 
Highwall
 
miner
production
 
is
 
also
 
projected
 
to
 
resume
 
in
 
2023
 
with
 
a
 
peak
 
in
 
2033
 
at
 
0.74
 
Mt.
 
Overall
production will continue until 2053 with peak production occurring in 2033 at 4.2 Mt.
The Logan County Complex
 
includes the Saunders
 
Preparation Plant in addition
 
to the mines.
 
The
 
plant
 
site
 
includes raw
 
coal
 
storage,
 
clean
 
coal
 
storage,
 
a
 
railroad
 
loadout,
 
and
 
refuse
disposal area.
 
The plant has a feed rate capacity of 1,088 raw tonnes per hour.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
1.6
 
Mineral Resource
Mineral
 
resources,
 
representing
 
in-situ
 
coal
 
in
 
which
 
a
 
portion
 
of
 
reserves
 
are
 
derived,
 
are
presented
 
below.
 
A
 
coal
 
resource
 
estimate,
 
summarized
 
in
Table
 
1-1
,
 
was
 
prepared
 
as
 
of
December 31, 2021, for property controlled by Coronado.
Table 1-1:
 
Coal Resources Summary as of December 31, 2021
 
(Mt)
 
Coal Resource (Dry Tonnes, In Situ, MT)
Resource Quality (Dry)
Area
Measured
Indicated
Inferred
Total
Ash%
Sulfur%
VM%
Inclusive of Reserves
129.6
47.7
0.0
177.3
24
1.0
28
Exclusive of Reserves
45.8
37.0
3.4
86.2
Total 12/31/2021
175.4
84.7
3.4
263.5
Note:
 
Resource tonnes are inclusive of reserve
 
tonnes since they include the in-situ tonnes from
 
which recoverable coal
reserves are derived.
Note 2:
 
Coal resources are reported on a dry basis.
 
Surface moisture and inherent moisture are excluded.
Note 3: The Property has 82.8 Mt of dry, in-place measured and indicated resource
 
tonnes exclusive of reserves as of December
31, 2021.
1.7
 
Mineral Reserve
Reserve
 
tonnage
 
estimates
 
provided
 
herein
 
report
 
coal
 
reserves
 
derived
 
from
 
the
 
in-situ
resource
 
tons
 
presented
 
in
Table
 
1-1
,
 
and
 
not
 
in
 
addition
 
to
 
coal
 
resources.
 
Proven
 
and
probable
 
coal
 
reserves
 
were
 
derived
 
from
 
the
 
defined
 
coal
 
resource
 
considering
 
relevant
mining,
 
processing,
 
infrastructure,
 
economic
 
(including
 
estimates
 
of
 
capital,
 
revenue,
 
and
cost), marketing, legal, environmental, socio-economic and regulatory factors.
 
The Resource
estimate has been used as the basis for this Reserve calculation, which utilizes a
 
reasonable
Preliminary Feasibility Study,
 
a Life-of Mine
 
(
LOM
) Mine
 
Plan and practical
 
recovery factors.
 
Production modeling was completed
 
with an effective start
 
date of October 1,
 
2021.
 
Additions
and depletion have been used to bring the Reserve estimate forward to December 31, 2021.
Factors
 
that
 
would
 
typically
 
preclude
 
conversion
 
of
 
a
 
coal
 
resource
 
to
 
coal
 
reserve,
 
which
include
 
the
 
following:
 
inferred
 
resource
 
classification;
 
absence
 
of
 
coal
 
quality;
 
poor
 
mine
recovery; lack of
 
access; geological encumbrances
 
associated with overlying
 
and underlying
strata;
 
seam
 
thinning;
 
structural
 
complication;
 
and
 
insufficient
 
exploration
 
have
 
all
 
been
considered.
 
Reserve consideration
 
excludes those
 
portions of
 
the resource
 
area which
 
exhibit
the aforementioned geological
 
and operational encumbrances.
 
Coal reserves are presented
on a run-of-mine (
ROM
) basis in
Table
 
1-2.
Table 1-2:
 
Coal Summary (ROM Basis (Moist)) as of December
 
31, 2021 (Mt)
 
Demonstrated Coal Reserves (Mt, Moist ROM)
Quality (Dry)
 
By Reliability Category
By Mining Type
By Control Type
Area / Mine
Proved
Probable
Total
Surface
UG
Owned
Leased
Ash
Sulfur
Vol
Logan Mine
Complex
94.9
42.0
136.9
38.5
98.4
0.0
136.9
49
0.9
20
Proven
 
and
 
probable
 
coal
 
reserve
 
were
 
derived
 
from
 
the
 
defined
 
in-situ
 
coal
 
resource
considering relevant
 
processing, economic
 
(including technical
 
estimates of
 
capital, revenue
and cost),
 
marketing, legal,
 
environmental, socioeconomic,
 
and regulatory
 
factors.
 
The proven
and probable coal reserves on the Property are summarized below in
Table
 
1-3.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex963p14i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Table 1-3:
 
Coal Reserves Summary (Marketable Sales Basis) as of
 
December 31, 2021 (Mt)
 
Demonstrated Coal Reserves (Wet Tons, Washed or Direct Shipped, MT)
Quality (Dry Basis)
 
By Reliability Category
By Mining Type
By Control Type
Property
Proven
Probable
Total
Surface
UG
Owned
Leased
Ash%
Sulfur%
VM%
Logan County
Complex
53.4
20.1
73.4
33.4
40.1
0.0
73.4
8
0.9
35
Note: Marketable reserve tonnes are reported on
 
a moist basis, including a combination of surface
 
and inherent moisture.
 
The
combination of surface and inherent moisture is
 
modeled between 4.5 and 6-percent, depending
 
upon mining method.
 
Actual
product moisture is dependent upon multiple geological
 
factors, operational factors, and product contract
 
specifications and can
exceed 8-percent.
 
As such, the modeled moisture values provide a level
 
of conservatism for reserve reporting.
In summary, Coronado controls a total of 73.4 Mt (moist basis) of marketable coal
 
reserves at
Logan
 
as
 
of
 
December 31,
 
2021.
 
Of
 
that
 
total,
 
73
 
percent
 
are
 
proven,
 
and
 
27
 
percent
 
are
probable.
 
All 73.4
 
Mt are leased
 
coal reserves and
 
are assigned.
 
Approximately 68.7
 
Mt of
reserves are considered suitable for the metallurgical coal market and 4.8 Mt are projected to
be sold into the thermal coal market.
 
1.8
 
Capital Summary
Coronado
 
provided
 
MM&A
 
with
 
an
 
inventory
 
of
 
operating
 
equipment
 
available
 
at
 
Logan.
 
MM&A’s
 
capital
 
schedules
 
assume
 
that
 
major
 
equipment
 
rebuilds
 
occur
 
over
 
the
 
course
 
of
each machine’s
 
remaining assumed
 
operating life.
 
Replacement equipment
 
was scheduled
based
 
on
 
MM&A’s
 
experience
 
and
 
knowledge
 
of
 
mining
 
equipment
 
and
 
industry
 
standards
with respect to
 
the useful life of
 
such equipment.
 
A summary of
 
the estimated capital for
 
the
Property is provided in
Figure 1-2
 
below.
Figure 1-2:
 
CAPEX
1.9
 
Operating Costs
Coronado provided
 
historical and
 
preliminary 5-year
 
projections of
 
operating costs
 
for its
 
active
mines
 
for
 
MM&A’s
 
review.
 
MM&A
 
used
 
the
 
historical
 
and/or
 
budget
 
cost
 
information
 
as
 
a
reference and developed personnel schedules for each mine.
 
Hourly labor rates and salaries
 
 
ex963p2i0.jpg ex963p15i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
were
 
based
 
upon
 
information
 
contained
 
in
 
Coronado’s
 
financial
 
summaries.
 
Fringe
 
benefit
costs were developed
 
for vacation and
 
holidays, federal and
 
state unemployment insurance,
retirement,
 
workers’
 
compensation
 
and
 
pneumoconiosis,
 
casualty
 
and
 
life
 
insurance,
healthcare and bonuses.
For the
 
underground operations,
 
a
 
cost factor
 
for
 
mine
 
supplies was
 
developed
 
that relates
expenditures
 
to
 
mine
 
advance
 
rates
 
for
 
roof
 
control
 
costs
 
and
 
other
 
mine
 
supply
 
costs
 
at
underground mines.
 
Other factors were developed for maintenance and repair
 
costs, rentals,
mine power, outside services and other direct mining costs.
 
Surface mine
 
direct operating
 
costs were
 
developed as
 
a function
 
of overburden
 
ratio for
 
repair
and maintenance
 
supplies, diesel
 
fuel, explosives
 
and blasting,
 
and miscellaneous
 
supplies
and services.
Operating costs for highwall mines are based on costs per ROM tonne estimates.
Operating costs factors were also developed for the coal preparation plant processing, refuse
handling, coal loading, property taxes, and insurance and bonding.
Appropriate royalty rates
 
were assigned for
 
production from leased
 
coal lands and sales
 
taxes
were calculated for
 
state severance taxes,
 
the federal black
 
lung excise tax, and
 
federal and
state reclamation fees.
A summary of the projected operating costs for the Property is provided in
Figure 1-3
.
Figure 1-3:
 
OPEX
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
1.10
 
Economic Evaluation
The pre-feasibility financial model
 
prepared for this TRS was
 
developed to test the economic
viability
 
of
 
the
 
coal
 
resource
 
area.
 
The
 
results
 
of
 
this
 
financial
 
model
 
are
 
not
 
intended
 
to
represent
 
a
 
bankable feasibility
 
study,
 
required for
 
financing of
 
any current
 
or future
 
mining
operations
 
contemplated
 
for
 
the
 
Coronado
 
properties,
 
but
 
are
 
intended
 
to
 
establish
 
the
economic
 
viability
 
of
 
the
 
estimated
 
coal
 
reserves.
 
Cash
 
flows
 
are
 
simulated
 
on
 
an
 
annual
basis in nominal dollars assuming a
 
2% inflation rate based on projected production
 
from the
coal reserves.
 
The discounted
 
cash flow analysis
 
presented herein
 
is based
 
on an effective
date of January 1, 2022.
 
On
 
an
 
un-levered
 
basis,
 
the
 
net
 
present
 
value
 
(
NPV
)
 
of
 
the
 
project
 
cash
 
flow
 
after
 
taxes
represents the Enterprise Value of the project.
 
The project cash flow, excluding debt service,
is calculated
 
by subtracting
 
direct and
 
indirect operating
 
expenses and
 
capital expenditures
from
 
revenue.
 
Direct
 
costs
 
include
 
labor,
 
operating
 
supplies,
 
maintenance
 
and
 
repairs,
facilities
 
costs
 
for
 
materials
 
handling,
 
coal
 
preparation,
 
refuse
 
disposal,
 
coal
 
loading,
reclamation and general and administrative costs.
 
Indirect costs include statutory and legally
agreed upon fees
 
related to direct
 
extraction of the
 
mineral.
 
The indirect costs
 
are the Federal
black lung tax, Federal and State reclamation taxes, property
 
taxes, coal production royalties,
and income taxes.
 
Table
 
1-4
 
shows
 
LOM
 
tonnage,
 
profit
 
&
 
loss
 
(
P&L
),
 
and
 
earnings
 
before
 
income
 
tax,
depreciation & amortization (
EBITDA
) for Logan.
Table 1-4:
 
Life-of-Mine Tonnage, P&L before Tax, and EBITDA ($000)
 
LOM
LOM
P&L
LOM
EBITDA
 
Tonnes
*
Pre-Tax P&L
Per Tonne
EBITDA
Per Tonne
Deep Mines
 
 
 
 
 
Camp Br Chilton
 
1,607
 
 
$32,285
 
 
$20.08
 
 
$54,357
 
 
$33.82
 
Eagle No. 1 (Toney Fork)
 
12,504
 
 
$91,928
 
 
$7.35
 
 
$205,032
 
 
$16.40
 
Elk Lick Chilton
 
3,809
 
 
$116,111
 
 
$30.48
 
 
$150,035
 
 
$39.39
 
Lower Powellton
 
5,095
 
 
$102,826
 
 
$20.18
 
 
$164,666
 
 
$32.32
 
Lower War Eagle
 
7,105
 
 
$207,728
 
 
$29.24
 
 
$308,368
 
 
$43.40
 
Powellton No. 1
 
3,677
 
 
$97,593
 
 
$26.54
 
 
$151,180
 
 
$41.12
 
Muddy Br No.2 Gas
 
4,188
 
 
$270,115
 
 
$64.50
 
 
$313,447
 
 
$74.85
 
Upper Winifrede
 
1,794
 
 
$57,593
 
 
$32.11
 
 
$78,591
 
 
$43.82
 
Winifrede (Chilton Rider)
 
278
 
 
$1,052
 
 
$3.79
 
 
$5,158
 
 
$18.58
 
Consolidated Deep Mines
 
40,057
 
 
$977,232
 
 
$24.40
 
 
$1,430,834
 
 
$35.72
 
 
Surface Mines
Toney Fork Surf
 
6,698
 
 
$30,295
 
 
$4.52
 
 
$142,924
 
 
$21.34
 
Buffalo Cr South Area
 
8,728
 
 
$97,428
 
 
$11.16
 
 
$221,170
 
 
$25.34
 
Sugar Camp Area 1
 
5,221
 
 
$32,688
 
 
$6.26
 
 
$148,325
 
 
$28.41
 
Surface Mines Consolidated
 
20,646
 
 
$160,411
 
 
$7.77
 
 
$512,419
 
 
$24.82
 
 
Highwall Miner (HWM)
Operations
Toney Fork HWM
 
4,705
 
 
$254,021
 
 
$53.99
 
 
$256,385
 
 
$54.49
 
Buffalo Cr South HWM
 
6,532
 
 
$439,179
 
 
$67.23
 
 
$440,183
 
 
$67.39
 
Sugar Camp HWM
 
1,501
 
 
$98,208
 
 
$65.43
 
 
$98,208
 
 
$65.43
 
HWM Consolidated
 
12,738
 
 
$791,408
 
 
$62.13
 
 
$794,775
 
 
$62.39
 
 
Grand Total
 
73,441
 
 
$1,929,050
 
 
$26.27
 
 
$2,738,028
 
 
$37.28
 
* The Financial model includes 0.03 million tonnes of inferred coal production.
 
Inferred coal
represents 0.04% of the total production, and none of this coal was included in the estimate of
reserves.
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
As shown in
Table
 
1-4,
 
the Logan operations
 
show positive EBITDA
 
over the LOM.
 
Overall,
the
 
Coronado
 
consolidated
 
operations
 
show
 
positive
 
LOM
 
P&L
 
and
 
LOM
 
EBITDA
 
of
 
$1.9
billion and $2.7 billion, respectively.
 
Coronado’s consolidated
 
Logan cash
 
flow summary
 
in nominal
 
dollars assuming
 
a 2%
 
inflation
rate, excluding debt service, is shown in
Table
 
1-5
 
below.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
9
Table 1-5:
 
Project Cash Flow Summary ($000)
*
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
Total
2022
2023
2024
2025
2026
Production & Sales tonnes
73,441
2,250
2,919
2,903
3,213
3,067
Total
 
Revenue
$9,980,224
$420,654
$344,156
$337,534
$394,845
$389,424
EBITDA
$2,738,028
$200,726
$78,732
$78,233
$110,802
$107,624
Net Income
$1,610,525
$120,459
$34,650
$29,605
$61,436
$59,748
Net Cash Provided by Operating Activities
$2,372,457
$125,587
$89,779
$70,664
$90,037
$94,643
Purchases of Property, Plant, and
Equipment
$(709,361)
$(54,793)
$(27,441)
$(27,989)
$(17,357)
$(13,652)
Net Cash Flow
$1,663,096
$70,794
$62,338
$42,674
$72,680
$80,991
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2027
2028
2029
2030
2031
2032
Production & Sales tonnes
3,396
3,661
3,579
3,326
2,950
3,438
Total
 
Revenue
$431,154
$451,609
$445,987
$420,670
$376,614
$440,781
EBITDA
$117,770
$119,515
$116,897
$111,475
$78,018
$87,218
Net Income
$65,436
$69,828
$70,242
$65,713
$34,306
$33,521
Net Cash Provided by Operating Activities
$100,542
$104,726
$104,191
$100,196
$77,188
$77,404
Purchases of Property, Plant, and
Equipment
$(59,598)
$(28,735)
$(27,081)
$(31,232)
$(48,753)
$(71,927)
Net Cash Flow
$40,944
$75,991
$77,110
$68,964
$28,435
$5,477
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2033
2034
2035
2036
2037
2038
Production & Sales tonnes
4,156
4,105
3,468
3,753
2,854
3,015
Total
 
Revenue
$537,477
$534,901
$465,163
$514,566
$405,973
$421,828
EBITDA
$142,816
$161,080
$119,812
$148,790
$92,000
$117,900
Net Income
$89,651
$103,843
$69,446
$91,589
$53,041
$76,624
Net Cash Provided by Operating Activities
$113,575
$136,352
$113,896
$123,326
$92,161
$99,895
Purchases of Property, Plant, and
Equipment
$(23,808)
$(29,414)
$(13,377)
$(19,641)
$(50,095)
$(29,180)
Net Cash Flow
$89,767
$106,938
$100,519
$103,685
$42,066
$70,715
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2039
2040
2041
2042
2043
2044
Production & Sales tonnes
2,436
2,201
1,845
1,459
1,180
1,112
Total
 
Revenue
$355,369
$338,176
$268,754
$214,586
$172,885
$150,118
EBITDA
$87,011
$83,646
$68,092
$62,920
$44,089
$34,328
Net Income
$55,313
$54,058
$44,925
$45,801
$29,936
$22,534
Net Cash Provided by Operating Activities
$83,815
$71,639
$61,735
$55,327
$42,764
$32,618
Purchases of Property, Plant, and
Equipment
$(15,349)
$(9,482)
$(14,390)
$(5,290)
$(14,378)
$(3,690)
Net Cash Flow
$68,466
$62,157
$47,345
$50,037
$28,386
$28,928
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2045
2046
2047
2048
2049
2050
Production & Sales tonnes
1,047
1,570
1,449
1,206
435
546
Total
 
Revenue
$152,705
$241,778
$219,387
$188,710
$76,217
$101,030
EBITDA
$31,080
$76,832
$69,847
$62,067
$19,753
$38,469
Net Income
$16,163
$53,074
$44,398
$39,304
$4,857
$21,379
Net Cash Provided by Operating Activities
$28,550
$56,069
$60,773
$54,739
$27,203
$29,794
Purchases of Property, Plant, and
Equipment
$(33,303)
$(3,327)
$(23,807)
$(5,664)
$(5,458)
$(1,150)
Net Cash Flow
$(4,752)
$52,742
$36,967
$49,075
$21,745
$28,645
 
 
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
10
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2051
2052
2053
2054
2055
2056
Production & Sales tonnes
564
318
21
-
-
-
Total
 
Revenue
$102,990
$60,217
$3,964
$-
$-
$-
EBITDA
$42,382
$26,401
$1,703
$-
$-
$-
Net Income
$24,434
$24,120
$1,383
$(164)
$(84)
$(43)
Net Cash Provided by Operating Activities
$35,071
$18,199
$3,510
$(1,729)
$(882)
$(899)
Purchases of Property, Plant, and
Equipment
$-
$-
$-
$-
$-
$-
Net Cash Flow
$35,071
$18,199
$3,510
$(1,729)
$(882)
$(899)
* The Financial model includes 0.03 million tonnes of inferred coal production.
 
Inferred coal represents 0.04% of the total
production, and none of this coal was included in the estimate of reserves.
Consolidated
 
cash
 
flows
 
are
 
driven
 
by
 
annual
 
sales
 
tonnage,
 
which
 
at
 
steady-state
 
level
ranges
 
from
 
a
 
peak
 
of
 
4.2
 
million
 
tonnes
 
in
 
2033
 
to
 
a
 
low
 
of
 
1.0
 
million
 
tonnes
 
in
 
2045.
 
Projected consolidated revenue
 
ranges from $150.1
 
million to $537.5
 
million at steady
 
state.
 
Revenue totals $10.0 billion for the project’s life.
Consolidated cash flow from operations is positive throughout the projected operating period,
with
 
the
 
exception
 
of
 
post-production
 
years,
 
due
 
to
 
end-of-mine
 
reclamation
 
spending.
 
Consolidated cash flow from operations peaks at $136.5 million
 
in 2034 and totals $2.4 billion
over the project’s
 
life.
 
Capital expenditures total
 
$141.2 million from
 
2022 through 2026
 
and
$709.4 million over the project’s life.
 
1.10.1
 
Discounted Cash Flow Analysis
Cash
 
flow
 
after
 
tax,
 
but
 
before
 
debt
 
service,
 
generated
 
over
 
the
 
life
 
of
 
the
 
project
 
was
discounted
 
to
 
NPV
 
at
 
a
 
10.0%
 
discount
 
rate,
 
which
 
represents
 
Coronado’s
 
estimate
 
of
 
the
nominal
 
dollar,
 
risk
 
adjusted
 
weighted
 
average
 
cost
 
of
 
capital
 
(
WACC
)
 
for
 
likely
 
market
participants if the subject reserves were offered for sale.
 
On an un-levered basis, the NPV of
the project
 
cash flows represents
 
the Enterprise Value
 
of the project
 
and amounts
 
to $611.3
million.
 
The
 
pre-feasibility
 
financial
 
model
 
prepared
 
for
 
the
 
TRS
 
was
 
developed
 
to
 
test
 
the
economic viability of
 
each coal resource area.
 
The NPV estimate was
 
made for purposes
 
of
confirming
 
the economics
 
for
 
classification of
 
coal reserves
 
and not
 
for purposes
 
of
 
valuing
Coronado
 
or
 
its
 
Logan
 
assets.
 
Mine
 
plans
 
were
 
not
 
optimized,
 
and
 
actual
 
results
 
of
 
the
operations may be different, but
 
in all cases, the
 
mine production plan assumes
 
the properties
are under competent management.
1.10.2
 
Sensitivity Analysis
Sensitivity of
 
the NPV
 
results to
 
changes in
 
the key
 
drivers is
 
presented in
 
the chart
 
below.
 
The sensitivity study
 
shows the NPV
 
at the 10.0%
 
discount rate when
 
Base Case sales
 
prices,
operating costs, and
 
capital costs are increased
 
and decreased in increments
 
of 5% within a
+/- 15% range.
 
 
ex963p2i0.jpg ex963p20i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
11
Figure 1-4:
 
Sensitivity of NPV
As shown, NPV
 
is quite sensitive
 
to change in
 
sales price and
 
operating cost estimates,
 
and
slightly sensitive to changes in capital cost estimates.
1.11
 
Permitting
Coronado
 
has
 
obtained
 
all
 
mining
 
and
 
discharge
 
permits
 
to
 
operate
 
its
 
active
 
mines
 
and
processing, loadout or related support
 
facilities.
 
MM&A is unaware of any obvious
 
or current
Coronado
 
permitting
 
issues
 
that
 
are
 
expected
 
to
 
prevent
 
the
 
issuance
 
of
 
future
 
permits.
 
Logan, along with all coal producers, is subject to a level
 
of uncertainty regarding future clean
water permits
 
due to
United States Environmental
 
Protection Agency
(
EPA
)
 
involvement
with state programs.
1.12
 
Conclusion and Recommendations
Sufficient
 
data
 
has
 
been
 
obtained
 
through
 
various
 
exploration
 
and
 
sampling
 
programs
 
and
mining operations to
 
support the geological
 
interpretations of seam
 
structure and thickness
 
for
coal horizons situated on the
 
Logan Property.
 
The data is of sufficient
 
quantity and reliability
to reasonably support the coal resource and coal reserve estimates in this TRS.
The geological
 
data and
 
preliminary feasibility
 
study,
 
which consider
 
mining plans,
 
revenue,
and
 
operating
 
and
 
capital
 
cost
 
estimates
 
are
 
sufficient
 
to
 
support
 
the
 
classification
 
of
 
coal
reserves provided herein.
This
 
geologic
 
evaluation
 
conducted
 
in
 
conjunction
 
with
 
the
 
preliminary
 
feasibility
 
study
concludes
 
that
 
the
 
73.4
 
Mt
 
of
 
marketable
 
coal
 
reserves
 
identified
 
on
 
the
 
Property
 
are
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
12
economically mineable under reasonable
 
expectations of market prices
 
for metallurgical coal
products, estimated operation costs, and capital expenditures.
2
Introduction
2.1
 
Registrant and Terms of Reference
This report was prepared
 
for the sole use
 
of
Coronado Global Resources
 
Inc. (
Coronado
)
and its affiliated and
 
subsidiary companies and advisors.
 
The report provides a statement of
coal resources and coal reserves for Coronado, as defined under the
Australasian Code for
Reporting of
 
Exploration Results,
 
Mineral Resources
 
and Ore
 
Reserves
(
JORC
 
Code
)
as well as
 
under Subpart 1300
 
of Regulation S-K
 
(Regulation S-K 1300)
 
promulgated by the
United States
 
Securities and
 
Exchange Commission
 
(
SEC
)
.
 
This report
 
was also
 
prepared
in accordance
 
with the
Australasian Code
 
for Public
 
Reporting of
 
Technical Assessments
and Valuations of Mineral Assets
(
VALMIN Code
).
The report provides a
 
statement of coal resources
 
and coal reserves for
 
Coronado at Logan.
 
Exploration results
 
and Resource
 
calculations were
 
used as
 
the basis
 
for the
 
mine planning
and
 
the
 
preliminary
 
feasibility
 
study
 
completed
 
to
 
determine
 
the
 
extent
 
and
 
viability
 
of
 
the
reserve.
Coal resources and coal reserves are herein
 
reported in metric units of measurement and
 
are
rounded to millions of metric tonnes (
Mt
).
2.2
 
Information Sources
This TRS
 
is based
 
on information
 
provided by
 
Coronado and
 
reviewed by
 
John Eckman,
 
CPG;
and Justin S. Douthat, PE, MBA.
 
Coronado engaged MM&A
 
to conduct a
 
coal resource
 
and reserve
 
evaluation of
 
the Coronado
coal properties as
 
of September 30,
 
2021.
 
Additions and depletion
 
have been used
 
to bring
the Resource and Reserve estimates forward
 
to December 31, 2021, the
 
effective date of this
TRS for Logan.
 
For the evaluation, the following tasks were to be completed:
 
>
 
Conduct site visits of the mines and mine infrastructure facilities;
 
>
 
Process the information supporting the estimation of coal resources and reserves into
geological models;
 
>
 
Develop life-of-reserve mine (
LOM
) plans and financial models;
>
 
Hold discussions with Coronado company management; and
 
>
 
Prepare and issue a TRS providing a statement of coal resources and reserves which
would include:
-
 
A description of the mines and facilities.
 
-
 
A description of the evaluation process.
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
13
-
 
An estimation of coal resources and reserves with compliance
 
elements as stated under the JORC Code
and the SEC Regulation S-K 1300.
2.3
 
Personal Inspections
MM&A is
 
very familiar
 
with Logan,
 
having provided
 
a variety
 
of services
 
in recent
 
years and
one of the QP’s involved in this TRS has conducted multiple site visits.
3
Property Description
3.1
 
Location
The Logan County
 
Complex is located
 
in Logan, Boone,
 
and Wyoming
 
Counties in southern
West
 
Virginia.
 
The Property
 
encompasses the
 
towns of
 
Lorado and
 
Pardee in
 
the northern
portion and Lacoma
 
and Cyclone in the
 
southern portion (approximately
 
6 kilometers between
the northern
 
and southern
 
towns).
 
The nearest
 
major population
 
centers are
 
Huntington, West
Virginia
 
(145
 
kilometers
 
northwest)
 
and
 
Charleston,
 
West
 
Virginia
 
(129
 
kilometers
 
north-
northeast).
The Logan property is composed of 13,138 total leased and
 
owned hectares and is located in
Logan,
 
Boone,
 
and
 
Wyoming
 
Counties.
 
The
 
Property
 
is
 
located
 
on
 
the
 
following
United
States Geological
 
Survey
(
USGS
) Quadrangles:
 
Lorado, Mallory, Amherstdale,
 
and Oceana.
 
Current mining projections fall within portions of all four quadrangles.
 
The coordinate system
and datum used for the model of the Logan County Complex and the subsequent maps were
produced in the West Virginia State Plane South system, NAD 27.
3.2
 
Titles, Claims or Leases
The Property
 
is composed
 
of 13,138
 
total hectares,
 
13,069 of
 
which are
 
leased from
 
private
landholders
 
under
 
approximately
 
15
 
individual
 
leases,
 
and
 
69
 
hectares
 
are
 
owned
 
by
Coronado.
 
Subject
 
to
 
Coronado
 
exercising
 
its
 
renewal
 
rights
 
thereunder,
 
a
 
majority
 
of
 
the
leases, covering a majority
 
of the Logan reserves, expire
 
upon exhaustion of the
 
relevant coal
reserves, which is expected to
 
occur in 2053.
 
One lease expires in
 
2032; however, Coronado
is
 
projected
 
to
 
have
 
previously
 
exhausted
 
the
 
reserves
 
covered
 
thereby.
 
MM&A
 
has
 
not
carried
 
out
 
a
 
separate
 
title
 
verification
 
for
 
the
 
coal
 
properties
 
and
 
has
 
not
 
verified
 
leases,
deeds,
 
surveys
 
or
 
other
 
property
 
control
 
instruments
 
pertinent
 
to
 
the
 
subject
 
resources.
 
Tenure
 
was separately reviewed by
 
Coronado’s legal advisors.
 
Coronado has represented to
MM&A that
 
it controls
 
the mining
 
rights to
 
the reserves
 
as shown
 
on its
 
property maps,
 
and
MM&A
 
has
 
accepted
 
these
 
as
 
being
 
a
 
true
 
and
 
accurate
 
depiction
 
of
 
the
 
mineral
 
rights
controlled by Coronado.
 
The TRS assumes
 
the properties are
 
developed under responsible
and experienced management.
3.3
 
Mineral Rights
Coronado
 
supplied
 
property
 
control
 
maps
 
to
 
MM&A
 
related
 
to
 
properties
 
for
 
which
 
mineral
and/or
 
surface
 
property
 
are
 
controlled
 
by
 
Coronado.
 
While
 
MM&A
 
accepted
 
these
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
14
representations
 
as
 
being
 
true
 
and
 
accurate,
 
MM&A
 
has
 
no
 
knowledge
 
of
 
past
 
property
boundary
 
disputes
 
or
 
other
 
concerns,
 
through
 
past
 
knowledge
 
of
 
the
 
Property,
 
that
 
would
signal concern over future mining operations or development potential.
Property control
 
in Appalachia can
 
be intricate.
 
Coal mining properties
 
are typically
 
composed
of numerous property
 
tracts which
 
are owned
 
and/or leased from
 
both land holding
 
companies
and
 
private
 
individuals
 
or
 
companies.
 
It
 
is
 
common
 
to
 
encounter
 
severed
 
ownership,
 
with
different entities or individuals
 
controlling the
 
surface and mineral
 
rights.
 
Mineral control in
 
the
region is
 
typically characterized
 
by leases
 
or ownership
 
of larger
 
tracts of
 
land, with
 
surface
control generally comprised of smaller tracts, particularly in developed areas.
Legal mining rights may
 
reflect a combination of
 
fee or mineral ownership
 
and fee or mineral
leases of coal
 
lands through various
 
surface and mineral
 
lease agreements.
 
There is also
 
a
relatively small amount
 
of area where
 
the coal is
 
partially-owned and/or
 
partially leased on
 
a
limited number of individual tracts.
 
Control of the surface property is necessary to
 
conduct surface mining but is not necessary
 
to
conduct underground mining.
Upon
 
acquisition
 
of
 
mineral
 
control
 
for
 
desired
 
coal
 
seams
 
of
 
surface-mineable
 
economic
interest,
 
it
 
is
 
typical
 
practice
 
in
 
the
 
region
 
for
 
operators
 
to
 
delay
 
the
 
acquisition
 
of
 
surface
control
 
for
 
purposes
 
of
 
surface
 
mining
 
and
 
other
 
surface
 
development
 
until
 
plans
 
are
established for
 
near-future development.
 
Therefore, it
 
is common
 
for an
 
operator to
 
control
mineral
 
for
 
proposed
 
areas
 
of
 
mining
 
for
 
which
 
they
 
have
 
not
 
established
 
the
 
legal
 
right
 
to
surface mine due to the lack of surface
 
control.
 
Acquisition of these rights is typically delayed
in
 
order to
 
limit cost
 
and
 
royalty payments
 
for areas
 
not under
 
consideration
 
for near-future
development.
 
Coronado’s
 
executive
 
management
 
team
 
has
 
a
 
history
 
of
 
surface
 
mining
 
in
Central
 
Appalachia
 
and
 
has
 
conveyed
 
to
 
MM&A
 
that
 
it
 
has
 
been
 
successful
 
in
 
acquiring
surface rights where needed for past operations.
3.4
 
Encumbrances
No Title
 
Encumbrances are known.
 
By assignment, MM&A did
 
not complete a query related
to Title Encumbrances.
 
3.5
 
Other Risks
There is
 
always risk
 
involved in
 
property control.
 
As is
 
common practice,
 
Coronado, and
 
its
predecessors,
 
have
 
had
 
their
 
legal
 
teams
 
examine
 
the
 
deeds
 
and
 
title
 
control
 
in
 
order
 
to
minimize
 
the
 
risk.
 
Historically,
 
property
 
control
 
has
 
not
 
posed
 
any
 
significant
 
challenges
related to Logan’s operations.
 
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
15
4
Accessibility, Climate, Local Resources,
Infrastructure and Physiography
4.1
 
Topography,
 
Elevation, and Vegetation
Topography
 
of
 
the
 
area
 
surrounding
 
the
 
Logan
 
County
 
Complex
 
is
 
typical
 
of
 
the
 
Central
Appalachian
 
Plateau,
 
being
 
rugged
 
and
 
deeply
 
dissected
 
by
 
v-shaped
 
river
 
valleys,
 
and
generally
 
flanked
 
by
 
steeply
 
sided
 
upland
 
regions,
 
with
 
occasional
 
gentle
 
slopes
 
in
 
select
areas.
 
The
 
drainage
 
system
 
in
 
the
 
region
 
tends
 
to
 
be
 
mostly
 
dendritic
 
in
 
nature.
 
Surface
elevations
 
near the
 
mine
 
complex range
 
from approximately
 
823 meters
 
above sea
 
level in
upland regions to
 
roughly 338 meters
 
at stream level.
 
The Property is moderately
 
to heavily
vegetated, with oak-hickory forests as the dominant forest type and northern hardwood forest
being
 
less
 
prominent.
 
The
 
Property
 
is
 
not
 
situated
 
near
 
any
 
major
 
urban
 
centers,
 
and
 
the
surrounding area is rural.
4.2
 
Access and Transport
Access
 
to
 
the
 
Logan Mine
 
property
 
consists of
 
primary,
 
secondary,
 
and
 
unimproved
 
roads,
forming a well-developed transportation
 
network.
 
Highway 119
 
is the primary highway in
 
the
area
 
running
 
southwest
 
to
 
northeast
 
from
 
the
 
Kentucky-West
 
Virginia
 
line
 
through
 
Mingo,
Logan, and Boone
 
Counties.
 
Secondary roads
 
Route 16
 
and Route
 
10 provide
 
the most
 
direct
access
 
through
 
the
 
Property
 
running
 
east-west
 
across
 
the
 
leased
 
area.
 
Numerous
 
other
secondary
 
and
 
unimproved
 
roads
 
provide
 
direct
 
access
 
to
 
the
 
mine
 
property,
 
some
 
being
state-
 
and
 
county-maintained.
 
These
 
roads
 
typically
 
stay
 
open
 
throughout
 
the
 
year.
 
Additionally, private access roads
 
to existing
 
mines provide
 
transport corridors,
 
and more
 
such
roads
 
may
 
be
 
developed
 
as
 
needed.
 
The
 
Coronado-owned
 
Saunders
 
Preparation
 
Plant
services the mines.
 
The ROM coal is
 
delivered from the Powellton
 
No. 1, Eagle No.
 
1, Muddy
Bridge and Lower
 
War Eagle
 
Mines via overland
 
conveyor, all
 
remaining production is or
 
will
be delivered to the plant site by truck.
 
4.3
 
Proximity to Population Centers
 
The
 
Logan
 
property
 
lies
 
near
 
the
 
town
 
of
 
Lorado
 
in
 
Logan
 
County,
 
West
 
Virginia,
approximately
 
145
 
kilometers
 
southeast
 
of
 
Huntington,
 
West
 
Virginia
 
and
 
129
 
kilometers
south-southwest of
 
Charleston, West
 
Virginia.
 
As of
 
the 2020
 
census, Logan
 
County had
 
a
population
 
of
 
32,567
 
residents,
 
Boone
 
County
 
had
 
21,809
 
residents,
 
and
 
Wyoming
 
County
had 21,382 residents.
 
4.4
 
Climate and Length of Operating Season
The
 
region’s
 
climate
 
is
 
classified
 
as
 
humid,
 
sub-tropical
 
with
 
four
 
distinct
 
seasons:
 
warm
summers, cold
 
winters, and
 
moderate fall
 
and spring
 
seasons.
 
Precipitation in
 
the region
 
is
consistent
 
throughout
 
the
 
year
 
with
 
the
 
most
 
rain
 
falling
 
in
 
spring
 
and
 
the
 
early
 
months
 
of
summer.
 
Average yearly rainfall is 67.69 centimeters.
 
Summer months typically begin in late
May and
 
end
 
in early
 
September
 
and range
 
in
 
average temperature
 
from 53
 
to 84
 
degrees
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
16
Fahrenheit (or 11.6 to 28.9 degrees Celsius).
 
Winters typically begin in mid to late November
and
 
run
 
until
 
mid
 
to
 
late
 
March
 
with
 
average
 
temperatures
 
ranging
 
from
 
26
 
to
 
57
 
degrees
Fahrenheit (or -3.3 to 13.9 degrees Celsius).
 
Precipitation in the winter typically comes in the
form of
 
snowfall or
 
as a
 
wintery mix
 
(sleet and
 
snow) with
 
severe snowfall
 
events occurring
occasionally.
 
Seasonal variations
 
in climate
 
typically do
 
not affect
 
underground mining
 
in West
Virginia.
 
However, weather events could potentially incumber surface
 
mining and preparation
plant operations on a very limited basis, typically lasting less than a few days.
4.5
 
Infrastructure
The
 
Logan
 
Mine
 
Complex
 
has
 
sources
 
of
 
water,
 
power,
 
personnel,
 
and
 
supplies
 
readily
available for
 
use.
 
Personnel have
 
historically been
 
sourced from
 
the surrounding
 
communities
in Logan, Boone, Wyoming, and
 
Mingo counties, and have
 
proven to be adequate
 
in numbers
to
 
operate
 
past
 
and
 
current
 
mines.
 
As
 
mining
 
is
 
common
 
in
 
the
 
surrounding
 
areas,
 
the
workforce is
 
generally familiar
 
with mining practices
 
and is
 
comprised of
 
a strong
 
talent pool
of experienced
 
miners.
 
Water is sourced locally
 
from Buffalo Creek
 
Public Service
 
District and
electricity is sourced
 
from
American Electric Power
 
(
AEP
)
.
 
The service industry
 
in the areas
surrounding
 
the
 
mine
 
complex
 
has
 
historically
 
provided
 
supplies,
 
equipment
 
repairs
 
and
fabrication,
 
etc.
 
The
 
Coronado-owned
 
Saunders
 
Preparation
 
plant
 
services
 
the
 
mines
 
and
operates at a
 
rate of 952
 
tph.
 
The Coronado-owned Elk
 
Lick Loadout serves
 
as the primary
means
 
of
 
shipment
 
and
 
is
 
connected
 
to
 
a
 
CSX
 
rail
 
line,
 
which
 
either
 
serves
 
the
 
domestic
market directly, or transports the coal to the Pier 6
 
and Dominion terminals at Norfolk, Virginia
for overseas shipment.
5
History
5.1
 
Previous Operation
The Logan
 
County properties
 
were started
 
in 1945
 
by
Lorado Mining
 
Company
, were
 
sold
to
Buffalo Mining Company
 
in 1964 and
 
then to
Pittston Coal Company
 
(
Pittston
)
 
in 1971.
 
Pittston
 
operated
 
the
 
properties
 
until
 
the
 
early
 
1990’s.
 
After
 
being
 
idle
 
for
 
a
 
period,
 
the
properties
 
were
 
then
 
sold
 
to
Addington
 
Resources
 
in
 
2004.
 
Imagin
 
Natural
 
Resources
acquired the properties in 2007, and sold to Cliffs in 2011,
 
which in turn sold the properties to
Coronado in 2014.
Coronado produced
 
approximately 1.8
 
Mt in
 
2016, 2.6
 
Mt in
 
2017, 2.6
 
Mt in
 
2018, 2.7
 
Mt in
2019, 1.6 Mt in 2020 and 1.9 Mt in 2021.
5.2
 
Previous Exploration
The
 
Properties
 
have
 
been
 
extensively
 
explored
 
by
 
subsurface
 
drilling
 
efforts
 
carried
 
out
 
by
numerous entities, most of which were completed prior to acquisition by Coronado.
Drill records indicate that independent contract drilling
 
operators have typically been engaged
to carry out drilling
 
on the Properties.
 
Geophysical logging was typically
 
performed by outside
 
 
ex963p26i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
17
logging
 
firms.
 
MM&A,
 
via
 
its
 
Geophysical
 
Logging
 
Systems
 
subsidiary,
 
has
 
logged
 
a
significant number of the past exploration holes
 
and gas wells, and currently logs most of
 
the
recently drilled holes.
6
Geological Setting, Mineralization and Deposit
6.1
 
Regional, Local and Property Geology
The
 
Property
 
lies
 
in
 
the
 
Central
 
Appalachian
 
Coal
 
basin
 
in
 
the
 
Appalachian
 
Plateau
physiographic province.
 
The
 
coal
 
deposits
 
in
 
the
 
eastern
 
USA
 
are
 
the
 
oldest
 
and
 
most
 
extensively
 
developed
 
coal
deposits in the country.
 
The coal deposits on the Properties
 
are Carboniferous in age, being
of
 
the
 
Pennsylvanian
 
system.
 
Overall,
 
these
 
Carboniferous
 
coals
 
contain
 
two-fifths
 
of
 
the
USA’s
 
bituminous coal deposits
 
and extend over
 
1,448 kilometers from
 
northern Alabama to
Pennsylvania and
 
are part
 
of what
 
is known
 
as the
Appalachian Basin
.
 
The Appalachian
 
Basin
is
 
more
 
than
 
402
 
kilometers
 
wide
 
and,
 
in
 
some
 
portions,
 
contains
 
over
 
60
 
coal
 
seams
 
of
varying economic significance.
Seams
 
of
 
economic
 
significance
 
typically
 
range
 
between
 
0.3
 
meters
 
and
 
1.8
 
meters
 
in
thickness,
 
with
 
relatively
 
little
 
structural
 
deformation.
 
Regional
 
structure
 
is
 
typically
characterized by gently dipping strata to the northwest at less than one percent.
The coal-bearing
 
formation of
 
interest at
 
Logan is
 
the lower
 
section of
 
the Allegheny
 
Formation
and
 
the
 
Kanawha
 
Formation,
 
which
 
comprise
 
a
 
major
 
portion
 
of
 
the
 
exposed
 
ridges.
 
The
Formation are a
 
coal bearing sequence
 
of sandstones, siltstones,
 
shales, and mudstones
 
with
minor occurrences of siderite, limestone and flint clay.
Coronado
mines several horizons
 
within the Kanawha
 
formation.
 
The horizons are
 
as follows:
 
Buffalo Creek, Upper Clarion Rider, Clarion, Lower Clarion,
 
Upper Stockton, Lower Stockton,
Lower Coalburg, Lower Dorothy, Upper Winifrede, Lower Winifrede, Chilton-A, Chilton,
 
Upper
Cedar Grove, Middle
 
Cedar Grove, Lower
 
Cedar Grove, No. 2
 
Gas, Upper Powellton, Lower
Powellton, Eagle, and Lower
 
War Eagle seams demonstrate mining
 
potential on this property.
Logan currently has four active underground mines and one
 
active surface mine.
 
The Toney
Fork mine is a
 
surface mine, while the
 
Powellton No. 1, Eagle
 
No. 1, Muddy Bridge
 
and Lower
War Eagle are
 
underground mines.
 
The active
 
Toney Fork surface mine
 
has historically
 
mined
multiple seams
 
including the
 
Upper Winifrede,
 
Lower Winifrede,
 
Upper Clarion
 
Rider,
 
Upper
Clarion,
 
Lower Clarion,
 
Lower
 
Coalburg, Upper
 
Coalburg,
 
Upper Stockton,
 
Lower
 
Stockton,
Chilton-A,
 
and
 
Lower Dorothy
 
Seams.
 
Future surface
 
mine
 
reserve
 
production at
 
Logan
 
is
anticipated to focus on those seams having the best opportunity
 
for sale into the metallurgical
coal
 
markets,
 
namely
 
the
 
Lower
 
Coalburg
 
seam
 
and
 
below.
 
The
 
Powellton
 
No.
 
1
 
Mine
 
is
projected to
 
extract the
 
Lower and
 
Upper Powellton
 
jointly in
 
some areas,
 
while other
 
areas
are projected to extract only the Lower Powellton due to seam splitting.
 
The Eagle No. 1 and
 
 
ex963p2i0.jpg ex963p27i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
18
Muddy Bridge Mines
 
are projected to
 
extract the No.
 
2 Gas seam.
 
The Lower War Eagle
 
mine
is projected to extract the Lower War Eagle seam.
 
6.2
 
Mineralization
The
 
generalized
 
stratigraphic
 
columnar
 
section
 
in
Figure
 
6-1
 
demonstrates
 
the
 
vertical
relationship of the principal coal seams and rock formations on the Property.
Figure 6-1:
 
Logan Stratigraphic Column
(not to scale)
6.3
 
Deposits
The
 
coal
 
produced
 
at
 
Logan
 
Mine
 
complex
 
is
 
typically
 
high-volatile
 
(typically
 
28
 
percent
 
or
greater volatile
 
matter content)
 
bituminous coal.
 
Quality varies
 
with distance
 
from the
 
cropline,
so some seams will be shipped into both the thermal
 
and metallurgical markets depending on
mining method and
 
ultimate quality.
 
Saleable product from
 
the surface
 
operations is projected
to be
 
sold primarily
 
into the
 
metallurgical coal
 
market; however,
 
some production
 
is planned
to
 
be sold
 
into the
 
thermal coal
 
market
 
due
 
to quality
 
limitations.
 
Underground
 
coal is
 
sold
almost exclusively into the metallurgical markets.
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
19
7
Exploration
7.1
 
Nature and Extent of Exploration
The
 
Properties
 
have
 
been
 
extensively
 
explored
 
by
 
subsurface
 
drilling
 
efforts
 
carried
 
out
 
by
numerous entities, most of which were completed prior to acquisition by Coronado.
Diamond core,
 
rotary,
 
and gas
 
well drilling
 
are the
 
three primary
 
types of
 
exploration on
 
the
Property.
 
Data for
 
correlation and
 
mining conditions
 
are derived
 
from core
 
descriptions and
geophysical logging
 
(e-logging).
 
Coal quality
 
analyses
 
were also
 
employed during
 
the core
exploration process.
 
A total
 
of 1,127
 
core and
 
rotary holes
 
have been
 
drilled for
 
exploration
purposes on and around the leased property.
Drill records indicate that independent contract drilling
 
operators have typically been engaged
to carry out
 
drilling on the
 
Property.
 
Geophysical logging was
 
typically performed by
 
outside
logging
 
firms.
 
MM&A,
 
via
 
its
 
Geophysical
 
Logging
 
Systems
 
subsidiary,
 
has
 
logged
 
a
significant number of the past exploration holes
 
and gas wells, and currently logs most of
 
the
recently drilled holes.
The location of the drilling is shown on the maps included in
Appendix B
.
The concentration
 
of exploration
 
varies slightly across
 
the Property.
 
Drilling on
 
the Property
is
 
typically
 
sufficient
 
for
 
delineation
 
of
 
potential
 
surface,
 
highwall miner,
 
and
 
deep
 
mineable
benches.
 
Core logging is carried out by professional geologists in cases where roof and floor
strata are of
 
particular interest and
 
in cases where
 
greater resolution and
 
geologic detail are
needed.
 
However,
 
most
 
drill
 
hole
 
data
 
come
 
from
 
simplified
 
driller’s logs,
 
which
 
often
 
lack
specific
 
details
 
regarding
 
geotechnical
 
conditions
 
and
 
specific
 
geology,
 
making
 
correlations
and
 
floor
 
and
 
roof
 
conditions
 
difficult
 
to
 
determine.
 
Geophysical
 
logging
 
(e-logging)
techniques, by
 
contrast, document
 
specific details
 
useful for
 
geologic interpretation
 
and mining
conditions.
 
Given the
 
variability of
 
data-gathering methods,
definitive
 
mapping of
 
future mining
conditions
 
may
 
not
 
be
 
possible,
 
but
 
projections
 
and
 
assumptions
 
can
 
be
 
made
 
within
 
a
reasonable
 
degree of
 
certainty.
 
A significant
 
effort
 
was put
 
into verifying
 
the integrity
 
of the
database.
 
Once this was established,
 
stratigraphic columnar sections were
 
generated using
cross-sectional analysis to establish or confirm coal seam correlations.
A typical cross-section is shown in
Figure 7-1
.
 
 
ex963p2i0.jpg ex963p29i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
20
Figure 7-1:
 
Logan Cross-Section
Due
 
to
 
the
 
long
 
history
 
of
 
exploration
 
by
 
various
 
parties
 
on
 
the
 
Property,
 
a
 
wide
 
variety
 
of
survey
 
techniques
 
exist
 
for
 
documentation
 
of
 
data
 
point
 
locations.
 
Many
 
of
 
the
 
older
exploration
 
drill holes
 
appear
 
to have
 
been located
 
by
 
survey and
 
more
 
recently-completed
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
21
drill
 
holes
 
are
 
often
 
located
 
by
 
high-resolution
 
Global
 
Positioning
 
System
 
(
GPS
)
 
units.
 
However,
 
some
 
holes appear
 
to
 
have
 
been approximately
 
located using
 
USGS topography
maps
 
or
 
other
 
methods
 
which
 
are
 
less
 
accurate.
 
Therefore,
 
discretion
 
had
 
to
 
be
 
used
regarding the
 
accuracy for
 
the location
 
and ground
 
surface elevation
 
of some
 
of these
 
older
drill
 
holes.
 
In
 
instances
 
where
 
a
 
drill
 
hole
 
location
 
(or
 
associated
 
coal
 
seam
 
elevations)
appeared to
 
be inconsistent
 
with the
 
overall structural
 
trend (or
 
surface topography
 
for surface-
mineable
 
areas),
 
the
 
data
 
point
 
was
 
not
 
honored
 
for
 
geological
 
modeling.
 
Others
 
with
apparently minor variances were adjusted and then used by MM&A.
 
Surveying
 
of
 
the
 
underground
 
and
 
surface
 
mined
 
areas
 
has
 
been
 
performed
 
by
 
the
 
mine
operators and/or
 
their consulting
 
surveyors.
 
By assignment,
 
MM&A did
 
not verify
 
the accuracy
or completeness
 
of
 
supplied
 
mine
 
maps
 
but accepted
 
this
 
information
 
as
 
being
 
the work
 
of
responsible engineers and surveyors, as required by both State and Federal Law.
MM&A compiled
 
comprehensive topographic
 
map files
 
by selecting
 
the best
 
available aerial
mapping for each area and filling any gaps with digital USGS topographic mapping.
7.2
 
Non-Drilling Procedures and Parameters
Some analyses, specifically ultimate
 
ash and sulfur types
 
are not as
 
prevalent as others in
 
the
testing
 
done
 
on
 
samples
 
recovered
 
by
 
drilling.
 
To
 
supplement
 
the
 
information
 
database,
samples have been collected
 
from mine stockpiles
 
and either truck or
 
train shipment samples.
7.3
 
Drilling Procedures
Core
 
drilling
 
methods
 
utilize
 
NX-size
 
(5.4
 
centimeters)
 
or
 
similar-sized
 
core
 
cylinders
 
to
recover core
 
samples, which
 
can be
 
used to
 
delineate geologic
 
characteristics, and
 
for coal
quality
 
testing
 
and
 
geotechnical
 
logging.
 
For
 
the
 
core
 
holes,
 
the
 
geophysical
 
logs
 
are
especially useful
 
in verifying
 
the core
 
recovery of
 
both the
 
coal samples
 
(for assurance
 
that
sample is
 
representative of
 
the full
 
seam) and
 
of the
 
roof and
 
floor rock
 
samples (for
 
evaluating
ground control
 
characteristics of
 
deep mineable
 
coal
 
seams).
 
In addition
 
to the
 
core holes,
rotary
 
drilled
 
holes also
 
exist
 
on
 
most
 
of
 
the Properties.
 
Data
 
for
 
the
 
rotary
 
drilled
 
holes is
mainly
 
derived
 
from
 
downhole
 
geophysical
 
logs,
 
which
 
are
 
used
 
to
 
interpret
 
coal
 
and
 
rock
thickness and depth since logging of the drill cuttings is not reliable.
A wide variety of core-logging
 
techniques exist for the properties.
 
For many of the core
 
holes,
the
 
primary
 
data
 
source
 
is
 
a
 
generalized
 
lithology
 
description
 
by
 
the
 
driller,
 
typically
supplemented by a more detailed core log completed
 
by a geologist.
 
These drilling logs were
provided
 
to
 
MM&A
 
as
 
a
 
geological
 
database.
 
MM&A
 
geologists
 
were
 
not
 
involved
 
in
 
the
production of
 
original core
 
logs but
 
did perform
 
a basic
 
check of
 
information within
 
the provided
database.
 
Where
 
geophysical
 
logs for
 
such holes
 
are available,
 
they were
 
used
 
by MM&A
geologists to verify the coal thickness and core recovery of seams.
 
7.4
 
Hydrology
Hydrologic testing and forecasting are necessary parts of the permitting process and as such
are routinely considered in the mine planning process.
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
22
Logan
 
has
 
a
 
lengthy
 
history
 
of
 
operation
 
and
 
five
 
currently
 
active
 
mines
 
with
 
no
 
significant
hydrologic concerns or
 
material issues experienced
 
in its history.
 
Future mining is
 
projected
to occur
 
in areas
 
exhibiting similar
 
hydrogeological conditions
 
as past
 
mining, including
 
stream
undermining and undermining of
 
aquifers.
 
Based upon the successful
 
history of the operation
with
 
regards
 
to
 
hydrogeological
 
features,
 
MM&A
 
assumes
 
that
 
the
 
operation
 
will
 
not
 
be
hindered by such issues in the future.
7.5
 
Geotechnical Data
Mining plans for
 
potential underground mines
 
were developed by
 
Coronado and modified
 
by
MM&A
 
to
 
fit
 
current
 
property
 
constraints.
 
Pillar
 
stability
 
was
 
tested
 
by
 
MM&A
 
using
 
the
Analysis of Coal Pillar
 
Stability (ACPS)
 
program that was developed
 
by the
National Institute
for Occupational Safety
 
and Health (
NIOSH
)
.
 
MM&A reviewed the
 
results from the
 
ACPS
analysis and considered it in the development of
 
the LOM plan.
 
Coal and rock strengths from
core testing are used to verify the empirical assumptions integral to ACPS.
8
Sample Preparation,
 
Analyses and Security
8.1
 
Prior to Sending to the Lab
Most
 
of
 
the
 
coal
 
samples
 
have
 
been
 
obtained
 
from
 
the
 
Property
 
by
 
subsurface
 
exploration
using core drilling techniques.
 
The protocol for preparing and testing the samples has varied
over time and is not well documented for the older holes drilled on the Property.
 
Typical USA
core
 
drilling
 
sampling
 
technique
 
is
 
for
 
the
 
coal
 
core
 
sample,
 
once
 
recovered
 
from
 
the
 
core
barrel, to be
 
described then wrapped
 
in a sealed
 
plastic sleeve and
 
placed into a
 
covered core
box,
 
which
 
is
 
the
 
length
 
of
 
the
 
sample
 
so
 
that
 
the
 
core
 
can
 
be
 
delivered
 
to
 
a
 
laboratory
 
in
relatively intact
 
condition and
 
with original
 
moisture content.
 
The core
 
identification number
and the depth
 
are scribed on
 
the sample box
 
lid to identify
 
the sample.
 
This process has
 
been
the norm for both historical and ongoing exploration activities at Logan.
This
 
work
 
is
 
typically
 
performed
 
by
 
the
 
supervising
 
driller,
 
geologist
 
or
 
company
 
personnel.
 
Samples are most often delivered to the company by the driller after each shift or acquired by
company
 
personnel
 
or
 
representatives.
 
Most
 
of
 
the
 
coal
 
core
 
samples
 
were
 
obtained
 
by
previous
 
or
 
current
 
operators
 
on
 
the
 
Property.
 
MM&A
 
did
 
not
 
participate
 
in
 
the
 
collection,
sampling and
 
analysis of
 
the core
 
samples.
 
However,
 
it is
 
reasonable to assume,
 
given the
sophistication level of
 
the previous
 
operators, that
 
these samples
 
were generally
 
collected and
processed under
 
industry best-practices.
 
This assumption
 
is based
 
on MM&A’s familiarity with
the operating companies and the companies used to perform the analysis.
8.2
 
Lab Procedures
Coal quality testing
 
has been performed
 
over a large
 
number of years
 
by operating companies
using different
 
laboratories and
 
testing regimens.
 
Some of
 
the samples
 
have raw
 
analyses
and
 
washabilities
 
on
 
the
 
full
 
seam
 
(with
 
coal
 
and
 
rock
 
parting
 
layers
 
co-mingled)
 
and
 
are
mainly useful
 
for characterizing
 
the coal
 
quality for
 
projected production
 
from underground
 
and
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
23
highwall mining.
 
Other samples have coal and rock analyzed separately, the results of which
can be manipulated to forecast either surface or
 
underground mining quality.
 
Care has been
taken to use only those analyses that
 
are representative of the coal quality parameters for
 
the
appropriate mining type for each sample.
Standard procedure upon receipt of core samples by the testing laboratory is to log the depth
and
 
thickness
 
of
 
the
 
sample,
 
then
 
perform
 
testing
 
as
 
specified
 
by
 
a
 
representative
 
of
 
the
operating
 
company.
 
Each
 
sample
 
is
 
then
 
analyzed
 
in
 
accordance with
 
procedures
 
defined
under
American
 
Society
 
for
 
Testing
 
and
 
Materials
 
(
ASTM
)
 
standards
 
including,
 
but
 
not
limited
 
to;
 
washability
 
(ASTM
 
D4371);
 
ash
 
(ASTM
 
D3174);
 
sulfur
 
(ASTM
 
D4239);
 
Btu/lb.
(ASTM D5865); volatile matter (ASTM D3175); Free Swell Index (
FSI
) (ASTM D720).
9
Data Verification
9.1
 
Procedures of Qualified Person
MM&A reviewed the digital geologic database supplied by Coronado.
 
The database consists
of data records, which include
 
drill hole information for holes
 
that lie within and adjacent
 
to the
Property and records for numerous supplemental coal seam thickness measurements.
 
Upon
completion
 
of
 
the
 
database
 
verification,
 
copies
 
of
 
each
 
entry
 
were
 
printed,
 
and
 
cross
referenced to the
 
original document for
 
verification.
 
Once the initial
 
integrity of the
 
database
was
 
established,
 
stratigraphic
 
columnar
 
sections
 
were
 
generated
 
using
 
cross-sectional
analysis to establish
 
or confirm
 
coal seam
 
correlations.
 
Geophysical logs were
 
used wherever
available
 
to
 
assist
 
in
 
confirming
 
the
 
seam
 
correlation
 
and
 
to
 
verify
 
proper
 
seam
 
thickness
measurements and recovery of coal samples.
 
After
 
establishing
 
and/or
 
verifying
 
proper
 
seam
 
correlation,
 
seam
 
data
 
control
 
maps
 
and
geological cross-sections were
 
generated and
 
again used
 
to verify seam
 
correlations and
 
data
integrity.
 
Once the
 
database was
 
fully vetted,
 
seam thickness, base
 
of seam
 
elevation, roof
and floor
 
lithology,
 
and overburden
 
maps were
 
independently generated
 
for use
 
in the
 
mine
planning process.
9.2
 
Limitations
As
 
with
 
any
 
exploration
 
program,
 
localized
 
anomalies
 
cannot
 
always
 
be
 
discovered.
 
The
greater the density of the
 
samples taken, the less
 
the risk.
 
Once an area is
 
identified as being
of interest for inclusion
 
in the mine plan,
 
additional samples are taken to
 
help reduce the risk
in those specific areas.
 
In general, provision is
 
made in the mine
 
planning portion of the
 
study
to
 
allow
 
for
 
localized
 
anomalies
 
that
 
are
 
typically
 
classed
 
more
 
as
 
a
 
nuisance
 
than
 
a
hinderance.
9.3
 
Opinion of Qualified Person
Sufficient
 
data
 
has
 
been
 
obtained
 
through
 
various
 
exploration
 
and
 
sampling
 
programs
 
and
mining operations to
 
support the geological
 
interpretations of seam
 
structure and thickness
 
for
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
24
coal
 
horizons
 
situated
 
on
 
the
 
Property.
 
The
 
data
 
is
 
of
 
sufficient
 
quantity
 
and
 
reliability
 
to
reasonably support the coal resource and coal reserve estimates in this TRS.
10
Mineral Processing and Metallurgical Testing
10.1
 
Testing Procedures
Separate tabulations have been compiled for basic chemical analyses (both raw and washed
quality),
 
petrographic
 
data,
 
rheological
 
data
 
and
 
chlorine,
 
ash,
 
ultimate
 
and
 
sulfur
 
analysis.
 
Some
 
of
 
the
 
data
 
categories
 
form
 
the
 
analyses
 
are
 
not
 
as
 
prevalent
 
and
 
have
 
been
supplemented
 
by
 
samples collected
 
from mine
 
stockpiles and
 
either truck
 
or train
 
shipment
samples.
Available coal quality data
 
was tabulated by resource area
 
in a Microsoft® EXCEL workbook
and
 
the
 
details
 
of
 
that
 
work
 
are
 
maintained
 
on
 
file
 
at
 
the
 
offices
 
of
 
Coronado
 
and
 
MM&A.
 
These
 
tables
 
also
 
provide
 
basic
 
statistical
 
analyses
 
of
 
the
 
coal
 
quality
 
data
 
sets,
 
including
average
 
value;
 
maximum
 
and
 
minimum
 
values;
 
and
 
the
 
number
 
of
 
samples
 
available
 
to
represent
 
each
 
quality parameter
 
of
 
the seam.
 
Coal samples
 
that were
 
deemed by
 
MM&A
geologists
 
to
 
be
 
unrepresentative
 
were
 
not
 
used
 
for
 
statistical
 
analysis
 
of
 
coal
 
quality,
 
as
documented
 
in
 
the
 
tabulations.
 
A
 
representative
 
group
 
of
 
drill
 
hole
 
samples
 
from
 
the
Properties
 
were
 
then
 
checked
 
against
 
the
 
original
 
drill
 
laboratory
 
reports
 
to
 
verify
 
accuracy
and correctness.
The
 
amount
 
and
 
areal
 
extent
 
of
 
coal
 
sampling
 
for
 
geological
 
data
 
is
 
generally
 
sufficient
 
to
represent
 
the
 
quality
 
characteristics
 
of
 
the
 
coal
 
horizons
 
and
 
allow
 
for
 
proper
 
market
placement of
 
the subject
 
coal seams.
 
For some
 
of the
 
coal deposits
 
there are
 
considerable
laboratory
 
data
 
from
 
core
 
samples
 
that
 
are
 
representative
 
of
 
the
 
full
 
extent
 
of
 
the
 
resource
area; and for others there are
 
more limited data to represent the
 
resource area.
 
For example,
in the
 
active operations with
 
considerable previous
 
mining, there may
 
be limited
 
quality data
within some of the remaining resource
 
areas; however, in those cases the core sampling
 
data
can
 
be
 
supplemented
 
with
 
operational
 
data
 
from
 
mining
 
and
 
shipped
 
quality
 
samples
representative of the resource area.
10.2
 
Relationship of Tests to the Whole
The extensive sampling and testing procedures typically followed in the coal industry result in
an excellent
 
correlation between
 
samples and marketable
 
product.
 
Shipped analyses of
 
the
coal
 
from
 
Logan
 
were
 
reviewed
 
to
 
verify
 
that
 
the
 
coal
 
quality
 
and
 
characteristics
 
were
 
as
expected.
 
The
 
Logan
 
properties
 
have
 
a
 
long
 
history
 
of
 
saleable
 
production,
 
under
 
various
owners, in the high-volatile metallurgical and thermal markets, confirming exploration results.
10.3
 
Lab Information
Each
 
sample
 
is
 
analyzed
 
at
 
area
 
Laboratories
 
that
 
operate
 
in
 
accordance
 
with
 
procedures
defined under
 
ASTM standards
 
including, but
 
not limited
 
to; washability (ASTM
 
D4371); ash
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
25
(ASTM D3174); sulfur (ASTM D4239); Btu/lb.
 
(ASTM D5865); volatile matter (ASTM D3175);
Free Swell Index (
FSI
) (ASTM D720).
10.4
 
Relevant Results
No critical
 
factors have
 
been found
 
that would
 
adversely affect
 
the recovery
 
of the
 
Reserve.
 
Any quality issues that occur,
 
either localized or generally are
 
accounted for in the Marketing
Study done for this TRS.
11
Mineral Resource Estimates
MM&A independently created
 
a geologic model
 
to define the
 
coal resources at
 
Logan.
 
Coal
resources were estimated as of December 31, 2021.
11.1
 
Assumptions, Parameters and Methodology
Geological
 
data
 
was
 
imported
 
into
 
Carlson
 
Mining
®
 
(formerly
 
SurvCADD
®
)
 
geological
modelling software
 
in the form
 
of Microsoft
®
 
Excel files
 
incorporating, drill hole
 
collars, seam
and thickness
 
picks, bottom
 
seam elevations
 
and raw
 
and washed
 
coal quality.
 
These data
files were validated prior
 
to importing into the
 
software.
 
Once imported, a geologic
 
model was
created,
 
reviewed,
 
and
 
verified
 
with
 
a
 
key
 
element
 
being
 
a
 
gridded
 
model
 
of
 
coal
 
seam
thickness.
 
Resource tonnes were estimated by using the seam thickness
 
grid based on each
valid
 
point
 
of
 
observation
 
and
 
by
 
defining
 
resource
 
confidence
 
arcs
 
around
 
the
 
points
 
of
observation.
 
Points of observation for Measured and Indicated confidence arcs were defined
for all
 
valid drill
 
holes that
 
intersected the
 
seam using
 
standards deemed
 
acceptable by
 
MM&A
based on
 
a detailed
 
geologic evaluation
 
and a
 
statistical analysis
 
of all
 
drill holes
 
within the
projected
 
reserve
 
areas
 
as
 
described
 
in
Section
 
11.1.1
.
 
The
 
geological
 
evaluation
incorporated an
 
analysis of
 
seam thickness
 
related to
 
depositional environments,
 
adjacent roof
and floor lithologies, and structural influences.
After validating coal
 
seam data and
 
establishing correlations, the
 
thickness and elevation
 
for
seams
 
of
 
economic
 
interest
 
were
 
used
 
to
 
generate
 
a
 
geologic
 
model.
 
Due
 
to
 
the
 
relative
structural simplicity of the deposits and the reasonable continuity of the tabular coal beds,
 
the
principal geological interpretation necessary to define the geometry of
 
the coal deposits is the
proper
 
modeling
 
of
 
their
 
thickness
 
and
 
elevation.
 
Both
 
coal
 
thickness
 
and
 
quality
 
data
 
are
deemed by
 
MM&A to be
 
reasonably sufficient
 
within the resource
 
areas.
 
Therefore, there is
a
 
reasonable
 
level
 
of
 
confidence
 
in
 
the
 
geologic
 
interpretations
 
required
 
for
 
coal
 
resource
determination based on the available data and the techniques applied to the data.
Table
 
11-1
 
below provides the geological
 
mapping and coal tonnage
 
estimation criteria used
for the coal resource and
 
reserve evaluation.
 
These cut-off parameters have been developed
by
 
MM&A
 
based
 
on
 
its
 
experience
 
with
 
the
 
Coronado
 
properties
 
and
 
are
 
typical
 
of
 
mining
operations
 
in
 
the
 
Central
 
Appalachian
 
coal
 
basin.
 
This
 
experience
 
includes
 
technical
 
and
economic
 
evaluations of
 
numerous
 
properties
 
in
 
the
 
region for
 
the purposes
 
of
 
determining
the economic viability of the subject coal reserves.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
26
Table 11
 
-1:
 
General Reserve & Resource Criteria
Item
Parameters
Technical Notes & Exceptions*
•
 
General Reserve Criteria
 
 
Reserve Classification
Reserve and Resource
Coal resources as reported are inclusive of coal reserves.
Reliability Categories
Reserve (Proven and Probable)
Resource (Measured, Indicated & Inferred)
To better reflect
 
geological conditions of the coal deposits,
distance between points of observation is standard USGS
(in meters), respectively, for measured
 
and indicated and
inferred.
Effective Date of Resource Estimate
December 31, 2021
Coal resources were updated for depletion and non-material
resource additions based on information from Coronado.
 
Effective date for coal resources is as of December
 
31,
2021.
Effective Date of Reserve Estimate
December 31, 2021
Coal reserves were updated for depletion and non-material
reserve additions based on information from Coronado.
 
Effective date for coal reserves is as of December
 
31, 2021.
Seam Density
Variable, dependent upon seam characteristics
(based on available drill hole quality).
 
In the
absence of laboratory data, estimated by (1)
assuming specific gravity of 1.30 for coal and 2.25 to
2.5 for rock parting, or (2) 1280 kg/m
3
to 1324 kg/m
3
for a "clean" seam)
•
 
Underground-Mineable Criteria
Map Thickness
Total seam thickness
Minimum Seam Thickness
0.76 meters (thermal coal); 0.68 meters
(metallurgical coal)
 
Minimum Mining Thickness
1.4 to 1.8 meters
Minimum Total Coal
 
Thickness
0.76 meters (thermal coal); 0.68 meters
(metallurgical coal)
 
Minimum In-Seam Wash Recovery
50 percent; 40 percent where coal is belted directly
to preparation plant
Wash Recovery Applied to Coal
Reserves
Based on average yield for drill holes within reserve
area, or in the absence of laboratory washability
data, based on estimated visual recovery using
specific gravities noted above and 95 percent yield
on "clean" coal
•
 
Underground-Mineable Criteria
 
Out-of-Seam Dilution Thickness for
Run-of-Mine Tonnes
 
Applied to Coal
Reserves
0.05 meters minimum
2243 kg/m³ density used for dilution tonnage estimate
Mine Barrier
60.96-meter distance from abandoned mines and
sealed or pillared areas; 100-foot distance from
planned highwall miner panels
Minimum Reserve Tonnage
226,796 recoverable tonnes for individual area
(logical mining unit)
Minimum Overburden Depth
30.48 meters
Minimum Interval to Rider Coal
Considered on a case-by-case basis, depending on
interval lithology, etc.
<1.5 meters are resource
Minimum Interval to Overlying or
Underlying Reserves
Considered on a case-by-case basis, depending on
interval lithology, extent and
 
type of extraction, etc.
Typically,
 
12.19 meters
Minimum Interval to Overlying or
Underlying Mined Areas
Considered on a case-by-case basis, depending on
interval lithology, extent and
 
type of extraction, etc.
Adjustments Applied to Coal Reserves
6 percent moisture increase; 5 percent preparation
plant inefficiency
Surface Mineable Criteria
Topographic Map Source
Reserves estimated based on aerial topography,
where available, and best available aerial
topography for other areas.
 
Pre-law highwalls also
based on aerial topography, where
 
available
Map Thickness
Total mineable seam
 
thickness (excluding removal
partings)
Mine Recovery Applied to Coal
Reserves
90 percent; 25 percent for previously underground
mined areas.
 
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
27
Item
Parameters
Technical Notes & Exceptions*
Wash Recovery
Not Applicable for most reserves estimated on a
direct-ship basis.
 
Where surface mineable coal is
projected to be washed, based on average yield for
drill holes within reserve area, or in the absence of
laboratory washability data, based on estimated
visual recovery using specific gravities noted above
and 95 percent yield on "clean" coal
Minimum Thickness
0.3 meter for principal seam (principle seam is any
that is >0.76 meters from another mineable coal
bench)
0.15 meters for a split of a principal seam (split is
within 0.76 meters of another mineable coal bench)
Minimum thickness of recoverable coal
within single seam CTR/Area/HWM
areas
0.6 meters
Removable Rock Parting Thickness
0.07 meters
Maximum Cumulative Area Mining Strip
Ratio
30:1 – Area
15:1 - CTR
Exceptions considered for metallurgical grade coal products
if deemed economical
Design Bench Width for Contour/HWM
Areas
38.1 meters (Contour reserves estimated in
conjunction with potential HWM reserves)
Adjustments Applied to Marketable
Coal Reserves
4.5 percent moisture increase
Out-of-Seam Dilution Thickness
Applied to Coal Reserves
NA
2% adjustment (addition) made to product coal quality
 
ash to
account for dilution
 
Surface Property Control
Reserves considered where surface is controlled;
tonnage not estimated or classified as resource
where surface is uncontrolled.
Highwall Miner Reserves
Penetration Depth
91.4 – 243.8 meters
Seam Density & Wash Recovery
Similar to underground-mineable reserves
Mine Recovery Applied to Coal
Reserves
40 percent
 
Minimum Coal Thickness
0.6 meter
Minimum Mining Height
0.9 meter
Adjustments Applied to Marketable
Coal Reserves
6 percent moisture increase and 5 percent
preparation plant inefficiency
Out-of-Seam Dilution Thickness
Applied to Coal Reserves
0.9 meter less seam height
2242 to 2402 kg/m
3
 
density used for dilution tonnage
estimate
Note:
 
Exceptions for application of
 
these criteria to
 
resource and reserve
 
estimation are made
 
as warranted and
 
demonstrated by either
 
actual
mining experience or
 
detailed data that
 
allows for empirical
 
evaluation of mining
 
conditions.
 
Final classification of
 
coal reserve is
 
made based
on the pre-feasibility evaluation.
11.1.1
 
Geostatistical Analysis
MM&A
 
completed
 
a
 
geostatistical
 
analysis
 
on
 
drill
 
holes
 
within
 
the
 
reserve
 
boundaries
 
to
determine
 
the applicability
 
of the
 
common United
 
States classification
 
system for
 
measured
and indicated
 
and inferred
 
coal resources.
 
Historically,
 
the United
 
States has
 
assumed that
coal within
 
0.4-kilometer of
 
a point
 
of observation
 
represents a
 
measured resource
 
whereas
coal
 
between
 
0.4
 
kilometer
 
and
 
1.2
 
kilometer
 
from
 
a
 
point
 
of
 
observation
 
is
 
classified
 
as
indicated.
 
Inferred resources
 
are commonly
 
assumed to
 
be located
 
between 1.2
 
kilometers
and
 
4.8
 
kilometers
 
from
 
a
 
point
 
of
 
observation.
 
Per
 
SEC
 
regulations,
 
only
 
measured
 
and
indicated resources may be
 
considered for reserve classification,
 
respectively as proven and
probable reserves.
MM&A
 
performed
 
a
 
geostatistical
 
analysis
 
test
 
of
 
the
 
Logan
 
data
 
set
 
using
 
the
 
Drill
 
Hole
Spacing
 
Analysis
 
(
DHSA
)
 
method.
 
This
 
method
 
attempts
 
to
 
quantify
 
the
 
uncertainty
 
of
applying
 
a
 
measurement
 
from
 
a
 
central
 
location
 
to
 
increasingly
 
larger
 
square
 
blocks
 
and
provides
 
recommendations
 
for
 
determining
 
the
 
distances
 
between
 
drill
 
holes
 
for
 
measured,
indicated, and inferred resources.
To
 
perform DHSA the
 
data set was
 
processed to remove
 
any erroneous data
 
points, clustered
data points, as
 
well as directional
 
trends.
 
This was achieved
 
through the use
 
of histograms,
 
 
ex963p2i0.jpg ex963p37i2.jpg ex963p37i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
28
as
 
seen
 
in
Figure
 
11-1
,
 
color
 
coded
 
scatter
 
plots
 
showing
 
the
 
geospatial
 
positioning
 
of
 
the
borings,
Figure 11-2
, and trend analysis.
Figure 11-1:
 
Histogram of the Total Seam
Thickness for the No. 2 Gas Seam Present
in the Logan Complex
Figure 11-2:
 
Scatter plot of the Total
Seam Thickness for the No. 2 Gas Seam
Present in the Logan Complex
Following the completion of data processing, a variogram of
 
the data set was created,
Figure
11
-3
.
 
The variogram
 
plots average
 
square difference
 
against the
 
separation distance
 
between
the data pairs.
 
The separation distance is broken
 
up into separate bins defined
 
by a uniform
lag distance
 
(e.g., for
 
a lag
 
distance of
 
152 meters the
 
bins would
 
be 0
 
– 152
 
meters, 153
 
–
305
 
meters,
 
etc.).
 
Each
 
pair
 
of
 
data
 
points
 
that
 
are
 
less
 
than
 
one
 
lag
 
distance
 
apart
 
are
reported in the first bin.
 
If the data pair is
 
further apart than one lag
 
distance but less than two
lag distances
 
apart, then the
 
variance is reported
 
in the second
 
bin.
 
The numerical average
for differences reported
 
for each
 
bin is
 
then plotted
 
on the
 
variogram.
 
Care was
 
taken to
 
define
the lag
 
distance in
 
such a
 
way as
 
to not
 
overestimate any
 
nugget effect
 
present in
 
the data
set.
 
Lastly,
 
modeled equations,
 
often spherical, gaussian,
 
or exponential,
 
are applied
 
to the
variogram in order to represent the data set across a continuous spectrum.
 
 
ex963p2i0.jpg ex963p38i1.jpg
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
29
Figure 11-3: Variogram
 
of the Total Seam Thickness for the No. 2 Gas Seam
 
Present in the Logan Complex
The estimation
 
variance is then
 
calculated using information
 
from the
 
modeled variogram as
well as charts published by Journel and Huijbregts (1978).
 
This value estimates the variance
from applying
 
a single
 
central measurement
 
to increasingly
 
larger square
 
blocks.
 
Care was
taken to
 
ensure any
 
nugget effect
 
present was
 
added back
 
into the
 
data.
 
This process
 
was
repeated for each test block size.
The
 
final step
 
of the
 
process is
 
to calculate
 
the global
 
estimation
 
variance.
 
In this
 
step the
number
 
square
 
blocks
 
that
 
would
 
fit
 
inside
 
the
 
selected
 
study
 
area
 
is
 
determined
 
for
 
each
block size that was investigated in the previous step.
 
The estimation variance is then divided
by the number of blocks
 
that would fit inside
 
the study area for
 
each test block size.
 
Following
this determination, the data
 
is then transformed back
 
to represent the relative
 
error in the 95
th
-
percentile range.
Figure
 
11-4
shows the
 
results
 
of
 
the DHSA
 
performed
 
on the
 
No. 2
 
Gas
 
seam
 
data for
 
the
Logan
 
Complex
.
 
DHSA
 
provides
 
hole
 
to
 
hole
 
spacing
 
values,
 
these
 
distances
 
need
 
to
 
be
converted
 
to
 
radius
 
from
 
a
 
central
 
point
 
in
 
order
 
to
 
compare
 
to
 
the
 
historical
 
standards.
 
A
summary of
 
the radius
 
data is
 
shown in
Table
 
11-3
.
 
DHSA prescribes measured,
 
indicated,
and inferred drill
 
hole spacings be
 
determined at the
 
10-percent, 20-percent, and
 
50-percent
levels of relative error, respectively.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex963p39i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
30
Figure 11-4: Result of DHSA for the No. 2 Gas Seam Present in the Logan Complex
Table 11
 
-2:
 
DHSA Results Summary for Radius from a Central
 
Point
Model:
Measured Radial Distance
(10% Relative Error)
Indicated Radial
Distance
(20% Relative Error)
Inferred Radial
Distance
(50% Relative Error)
(km)
(km)
(km)
Gaussian:
0.99
1.66
3.94
Spherical:
0.87
1.53
3.53
Exponential:
0.87
1.53
3.53
Comparing the results of
 
the DHSA to
 
the historical standards, it
 
is evident that the
 
historical
standards are more conservative than even the most conservative DHSA model with regards
to
 
determining
 
measured
 
resources.
 
The
 
Exponential
 
and
 
Spherical
 
models
 
recommend
using a radius
 
of 0.87 kilometers for
 
measured resources compared to
 
the historical value of
0.4
 
kilometers.
 
With
 
respect
 
to
 
indicated
 
resources
 
the
 
Spherical
 
and
 
Exponential
 
models
recommend using a radius
 
1.53 kilometers.
 
The historical radius
 
of 1.2 kilometers
 
is therefore
also more
 
conservative than
 
the DHSA
 
results for
 
indicated
 
resources.
 
These results
 
have
led the QP’s to report the data following
 
the historical classification standards, rather than
 
use
the results of the DHSA.
11.2
 
Qualified Person’s Estimates
Mineral
 
resources,
 
representing
 
in-situ
 
coal
 
in
 
which
 
a
 
portion
 
of
 
reserves
 
are
 
derived,
 
are
presented
 
below.
 
Based
 
on
 
the
 
work
 
described
 
and
 
detailed
 
modelling
 
of
 
the
 
areas
considering all the
 
parameters defined, a
 
coal resource estimate, summarized
 
in
Table
 
11-3
,
was prepared as of December 31, 2021, for property controlled by Coronado.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
31
Table 11
 
-3:
 
Coal Resources Summary as of December 31, 2021
 
(Mt)
 
Coal Resource (Dry Tonnes, In Situ, MT)
Resource Quality (Dry)
Area
Measured
Indicated
Inferred
Total
Ash%
Sulfur%
VM%
Inclusive of Reserves
129.6
47.7
0.0
177.3
24
1.0
28
Exclusive of Reserves
45.8
37.0
3.4
86.2
Total 12/31/2021
175.4
84.7
3.4
263.5
Note:
 
Resource tonnes are inclusive of reserve
 
tonnes since they include the in-situ tonnes from
 
which recoverable coal
reserves are derived.
Note 2:
 
Coal resources are reported on a dry basis.
 
Surface moisture and inherent moisture are excluded.
Note 3: The Property has 82.8 Mt of dry, in-place measured and indicated resource
 
tonnes exclusive of reserves as of December
31, 2021.
11.3
 
Resources Exclusive of Reserves
The
 
Property
 
contains
 
multiple
 
resource
 
blocks
 
which
 
were
 
not
 
deemed
 
to
 
exhibit
 
reserve
potential at the time of the study.
 
These underground-mineable resources, formally identified
as resources exclusive of reserves, are located in
 
the No. 2 Gas, Lower Powellton, Peerless,
Lower
 
Winifrede,
 
Middle
 
Cedar
 
Grove
 
and
 
Beckley
 
coal
 
seams.
 
There
 
are
 
also
 
surface
mineable
 
resources exclusive
 
of
 
reserves
 
in
 
various
 
seams.
 
Reasons
 
which
 
may
 
preclude
elevation of resources to reserves include, but are not limited to:
1.
 
Unfavorable economics at the PFS level, yet economics could become attractive in the
future under different market conditions.
 
2.
 
Exclusion from LOM planning by mining operator due to remaining resource blocks which
are relatively small, isolated blocks and not currently attractive from an operational
perspective.
 
11.3.1
 
Initial Economic Assessment
MM&A completed
 
an initial
 
economic assessment
 
to determine
 
the potential
 
economic viability
of
 
resources
 
exclusive
 
of
 
reserves.
 
Unlike
 
the
 
economic
 
analysis
 
presented
 
in
 
Chapter
 
19
developed to
 
test reserves,
 
the initial
 
economic assessment
 
below is
 
presented on
 
a real
 
basis
in 2022
 
dollars.
 
MM&A applied relevant
 
technical factors
 
to estimate
 
potential saleable tonnes
without the resource
 
blocks, should the
 
resources be extracted
 
via deep, continuous
 
mining
methods
 
or
 
surface
 
area
 
methods.
 
MM&A
 
developed
 
cash
 
cost
 
profiles
 
for
 
the
 
resource
blocks,
 
including
 
direct
 
cash
 
costs
 
(labor,
 
supplies,
 
roof
 
control,
 
maintenance
 
and
 
repair,
power,
 
and
 
other);
 
washing,
 
trucking,
 
materials
 
handling,
 
general
 
and
 
administrative,
 
and
environmental
 
costs;
 
and
 
indirect
 
cash
 
costs
 
(royalties,
 
production
 
taxes,
 
property
 
tax,
insurance).
 
Costs were developed based off relevant cost drivers (per-meter, per-bank cubic
meter, per-raw-tonne, per-clean-tonne).
 
Additionally, MM&A estimated capital
 
costs to
 
extract
resources.
 
Capital
 
costs
 
associated
 
with
 
mine
 
development
 
were
 
amortized
 
across
 
the
resource’s potential saleable
 
tonnages.
 
Additional non-cash items
 
(depreciation of equipment
and
 
depletion) and
 
cash costs
 
were compared
 
to an
 
assumed
 
sale price
 
of $130
 
per tonne
(FOB loadout) for underground-mineable
 
resources, representing the
 
long-term average price
forecast for HVB
 
provided by Coronado.
 
Surface resources were
 
assessed at
 
a sales price
of $52 per
 
tonne (FOB loadout)
 
based on estimated
 
historical pricing for
 
Coronado’s surface
operations.
 
Results of
 
the analysis are
 
shown below and
 
demonstrate potential profitability
 
on
a fully loaded cost basis.
 
Detailed summaries are shown in
Appendix D
.
 
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex963p41i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
32
Table 11
 
-4:
 
Results of Initial Economic Assessment
Mine
Resource
Block
Direct
Cash
Transportation,
Washing,
Enviro, G&A
Indirect
Non-
Cash
Total
Cost
Fully
Loaded
P&L
Toney
 
Fork #2
N2G
 
$60.58
 
 
$15.01
 
 
$16.90
 
 
$13.82
 
$106.30
 
 
$23.77
 
Pardee
N2G
 
$66.63
 
 
$18.11
 
 
$16.90
 
 
$9.90
 
$111.54
 
 
$18.53
 
Sugar Camp
N2G
 
$83.54
 
 
$21.67
 
 
$16.90
 
 
$7.93
 
$130.03
 
 
$0.04
 
Lower Powellton
LPOW
 
$64.37
 
 
$15.53
 
 
$16.90
 
 
$6.61
 
$103.42
 
 
$26.66
 
N2G Peerless
LPOW
 
$67.34
 
 
$16.15
 
 
$16.90
 
 
$15.97
 
$116.35
 
 
$13.72
 
N2G Peerless
Peer
 
$86.35
 
 
$12.15
 
 
$16.90
 
 
$13.54
 
$128.94
 
 
$1.13
 
Beckley
Bec
 
$58.62
 
 
$14.06
 
 
$16.90
 
 
$13.87
 
$103.45
 
 
$26.63
 
Middle Cedar Grove
MCG
 
$62.16
 
 
$15.62
 
 
$16.90
 
 
$29.20
 
$123.88
 
 
$6.20
 
Ramaco
N2G
 
$56.27
 
 
$18.98
 
 
$16.90
 
 
$25.07
 
$117.22
 
 
$12.85
 
Lower Winifrede
LWIN
 
$51.37
 
 
$17.72
 
 
$16.90
 
 
$10.77
 
 
$96.76
 
 
$33.32
 
Thermal Area Mines
(S)
S
 
$29.45
 
 
$6.34
 
 
$8.41
 
 
$6.61
 
 
$50.81
 
 
$1.00
 
Figure 11-5:
 
Results of Initial Economic Assessment
11.4
 
Qualified Person’s Opinion
While there is
 
some level of
 
stratigraphically controlled seam-thickness
 
variability due to
 
seam
splitting,
 
sand
 
channels,
 
etc.,
 
the
 
coal
 
seams
 
on
 
the
 
mine
 
property
 
in
 
Logan
 
County
demonstrate
 
reasonable
 
thickness
 
consistency
 
according
 
to
 
the
 
classification
 
system
 
of
measured
 
(0
 
–
 
0.4
 
kilometer),
indicated
 
(0.4
 
to
 
1.2
 
kilometers),
 
and
inferred
 
(1.2
 
to
 
4.8
kilometers).
 
MM&A geologists
 
and engineers
 
modeled the
 
deposit and
 
delineated mineable
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
33
regions to reflect the
 
nature of each seam
 
and the practicality
 
of mining constraints.
 
Based on
MM&A’s
 
geostatistical analysis,
 
it would
 
be possible
 
to extend
 
the measured,
 
indicated and
inferred
 
arcs
 
slightly
 
beyond
 
historically
 
accepted
 
practices
 
due
 
to
 
consistent
 
geological
settings
.
 
The
 
QP’s
 
have
 
again
 
elected
 
not
 
to
 
extend
 
arc
 
distances,
 
introducing
 
a
 
level
 
of
conservatism in measured and indicated coal classification.
Based on the data
 
review, the attendant work done to
 
verify the data integrity
 
and the creation
of an independent geologic model, the
 
QPs believe
 
this is a fair and accurate
 
representation
of the Logan coal resources.
12
Mineral Reserve Estimates
12.1
 
Assumptions, Parameters and Methodology
Coal Reserves are
 
classified as
proven
 
or
probable
 
considering “modifying factors” including
mining,
 
metallurgical,
 
economic,
 
marketing,
 
legal,
 
environmental,
 
social
 
and
 
governmental
factors.
>
Proven Coal Reserves
 
are the economically mineable part of a measured coal resource,
adjusted for diluting materials and allowances for losses when the material is mined.
 
It is
based on appropriate assessment and studies in consideration of and adjusted for
reasonably assumed modifying factors.
 
These assessments demonstrate that extraction
could be reasonably justified at the time of reporting.
 
>
Probable Coal Reserves
 
are the economically mineable part of an indicated coal
resource, and in some circumstances a measured coal resource, adjusted for diluting
materials and allowances for losses when the material is mined.
 
It is based on
appropriate assessment and studies in consideration of and adjusted for reasonably
assumed modifying factors.
 
These assessments demonstrate that extraction could be
reasonably justified at the time of reporting.
 
Upon completion
 
of delineation
 
and calculation
 
of coal
 
resources, MM&A
 
generated
 
a LOM
plan for Logan.
 
The footprint of each reserve area is shown on the maps in
Appendix B
.
 
The
Mine
 
plan
 
was
 
generated
 
based
 
on
 
the
 
forecast
 
mine
 
plan
 
and
 
permit
 
plan
 
provided
 
by
Coronado with modifications
 
by MM&A where
 
necessary due to
 
current property control
 
limits,
modifications to geologic mapping, or other factors determined during the evaluation.
Carlson Mining software
 
was used to
 
generate the LOM
 
plan for Logan.
 
The mine plan
 
was
sequenced
 
based
 
on
 
productivity
 
schedules
 
provided
 
by
 
Coronado.
 
MM&A
 
judged
 
the
productivity estimates and
 
plans to be
 
reasonable based on
 
experience and
 
current industry
practice.
Raw,
 
ROM
 
production
 
data
 
outputs
 
from
 
LOM
 
plan
 
sequencing
 
were
 
processed
 
into
Microsoft
®
 
EXCEL spreadsheets and summarized on
 
an annual basis for processing
 
into the
economic
 
model.
 
Average
 
seam
 
densities
 
were
 
estimated
 
to
 
determine
 
raw
 
coal
 
tonnes
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
34
produced from
 
the LOM
 
plan.
 
Average mine recovery
 
and wash
 
recovery factors
 
were applied
to determine coal reserve tonnes.
 
Coal reserve
 
tonnes in
 
this evaluation
 
are reported
 
at a
 
4.5 percent
 
to 6.0
 
percent moisture
and represent the saleable product from the Property.
 
Pricing data as provided
 
by Coronado is described
 
in
Section 16.2
.
 
The pricing data
 
assumes
respective HVA, HVB, specialty markets
 
and thermal FOB-mine
 
prices of approximately
 
$224,
$123,
 
and
 
$51
 
per
 
metric
 
tonne
 
for
 
calendar
 
year
 
2022.
 
HVA,
 
HVB,
 
and
 
thermal
 
prices
respectively decrease
 
to
 
approximately $145,
 
$115,
 
and
 
$51
 
per metric
 
tonne
 
through year
2026,
 
and
 
then
 
increase to
 
$227,
 
$189,
 
and
 
$51
 
per
 
metric
 
tonne through
 
year 2050
 
(after
which sales prices were held constant).
The
 
coal resource
 
mapping and
 
estimation process,
 
described
 
in this
 
report was
 
used as
 
a
basis for the coal
 
reserve estimate.
 
Proven and probable coal
 
reserves were derived
 
from the
defined
 
coal
 
resource
 
considering
 
relevant
 
processing,
 
economic
 
(including
 
technical
estimates of
 
capital, revenue,
 
and cost),
 
marketing, legal,
 
environmental, socio-economic, and
regulatory factors and are presented on a moist, recoverable basis.
As is customary in
 
the US, the categories
 
for proven and probable
 
coal reserves are based
 
on
the distances from valid points of measurement as determined by the QPs for
 
the area under
consideration.
 
For
 
this
 
evaluation,
 
measured
 
resource,
 
which
 
may
 
convert
 
to
 
a
 
proven
reserve, is based on a 0.4-kilometer radius from a valid point of observation.
Points of observation
 
include exploration drill
 
holes, gas wells,
 
and mine measurements
 
which
have been fully vetted and processed into a geologic model.
 
The geologic model is based on
seam depositional modeling,
 
the interrelationship of overlying
 
and underlying strata
 
on seam
mineability,
 
seam
 
thickness
 
trends,
 
the
 
impact
 
of
 
seam
 
structure
 
(i.e.,
 
faulting),
 
intra-seam
characteristics, etc.
 
Once the geologic model
 
was completed, a statistical
 
analysis, described
in
Section 11.1.1
 
was conducted and a
 
0.4-kilometer radius from
 
a valid point
 
of observation
was selected to define Measured Resources.
 
Likewise,
 
the
 
distance
 
between
 
0.4
 
and
 
1.2
 
of
 
a
 
kilometer
 
radius
 
was
 
selected
 
to
 
define
Indicated Resources.
 
Indicated Resources may convert to Probable Reserves.
 
Inferred Resources (greater
 
than a 1.2-kilometer
 
radius from a
 
valid point
 
of observation) have
been excluded from Reserve consideration.
12.2
 
Qualified Person’s Estimates
Reserve
 
tonnage
 
estimates
 
provided
 
herein
 
report
 
coal
 
reserves
 
derived
 
from
 
the
 
in-situ
resource tonnes presented
 
in
Table
 
11-3
, and not
 
in addition to
 
coal resources.
 
Proven and
probable
 
coal
 
reserves
 
were
 
derived
 
from
 
the
 
defined
 
coal
 
resource
 
considering
 
relevant
mining,
 
processing,
 
infrastructure,
 
economic
 
(including
 
estimates
 
of
 
capital,
 
revenue,
 
and
cost),
 
marketing,
 
legal,
 
environmental,
 
socio-economic
 
and
 
regulatory
 
factors.
 
The
 
coal
reserves, as
 
shown in
Table
 
12-2
, are
 
based on
 
a technical
 
evaluation of
 
the geology
 
and a
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
35
preliminary feasibility
 
study of
 
the coal
 
deposits.
 
The extent
 
to which
 
the coal
 
reserves may
be affected
 
by any
 
known environmental,
 
permitting, legal,
 
title, socio-economic,
 
marketing,
political, or other relevant issues has been reviewed rigorously.
 
Similarly, the extent to which
the
 
estimates
 
of
 
coal
 
reserves
 
may
 
be
 
materially
 
affected
 
by
 
mining,
 
metallurgical,
infrastructure
 
and
 
other
 
relevant
 
factors
 
has
 
also
 
been
 
considered.
 
Coal
 
reserves
 
are
presented on a ROM basis in
Table
 
12-1.
Table 12-1:
 
Coal Reserves Summary (ROM Basis (Moist)) as of December
 
31, 2021 (Mt)
 
Demonstrated Coal Reserves (Mt, Moist ROM)
Quality (Dry)
 
By Reliability Category
By Mining Type
By Control Type
Area / Mine
Proved
Probable
Total
Surface
UG
Owned
Leased
Ash
Sulfur
Vol
Logan Mine
Complex
94.9
42.0
136.9
38.5
98.4
0.0
136.9
49
0.9
20
In the
 
financial analysis
 
some of
 
the projected
 
mines were
 
not economically
 
viable.
 
The tonnes
projected to be mined from these locations have not been included in the Reserve Base.
Table 12-2:
 
Coal Reserves Summary (Marketable Sales Basis) as of
 
December 31, 2021 (Mt)
 
Demonstrated Coal Reserves (Wet Tons, Washed or Direct Shipped, MT)
Quality (Dry Basis)
 
By Reliability Category
By Mining Type
By Control Type
Property
Proven
Probable
Total
Surface
UG
Owned
Leased
Ash%
Sulfur%
VM%
Logan County
Complex
53.4
20.1
73.4
33.4
40.1
0.0
73.4
8
0.9
35
Note: Marketable reserve tonnes are reported on
 
a moist basis, including a combination of surface
 
and inherent moisture.
 
The
combination of surface and inherent moisture is
 
modeled between 4.5 and 6-percent, depending
 
upon mining method.
 
Actual
product moisture is dependent upon multiple geological
 
factors, operational factors, and product contract
 
specifications and can
exceed 8-percent.
 
As such, the modeled moisture values provide a level
 
of conservatism for reserve reporting.
The results of
 
this TRS define an
 
estimated 73.4 Mt of
 
proven and probable marketable
 
coal
reserves.
 
Of that total,
 
73 percent are
 
proven, and 27
 
percent are probable.
 
All 73.4 Mt
 
are
leased
 
coal reserves
 
and
 
are assigned.
 
Approximately 68.7
 
Mt of
 
reserves
 
are
 
considered
suitable for the metallurgical coal
 
market and 4.8 Mt are
 
projected to be sold
 
into the thermal
coal market.
12.3
 
Qualified Person’s Opinion
The estimate of coal reserves was determined in accordance with the JORC Code along with
SEC Regulation S-K 1300.
The
 
LOM
 
mining
 
plan
 
for
 
Logan
 
was
 
prepared
 
to
 
the
 
level
 
of
 
preliminary
 
feasibility.
 
Mine
projections
 
were
 
prepared,
 
and
 
timing
 
scheduled
 
to
 
match
 
production
 
with
 
coal
 
seam
characteristics.
 
Production timing
 
was carried
 
out from
 
current locations
 
to depletion
 
of the
coal
 
reserve
 
area.
 
Coal
 
reserve
 
estimates
 
could
 
be
 
materially
 
affected
 
by
 
the
 
risk
 
factors
described in
Section 22.2
.
Based
 
on
 
the
 
Preliminary
 
Feasibility
 
Study
 
and
 
the
 
attendant
 
Economic
 
Review,
 
the
 
QPs
believe this is a fair and accurate calculation of the Logan coal reserves.
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
36
13
Mining Methods
Nine
 
underground
 
and
 
three
 
surface
 
mining
 
areas
 
were
 
modeled
 
and
 
tested
 
economically.
 
Once
 
the
 
Resources
 
were
 
calculated,
 
mine
 
plans
 
were
 
created
 
to
 
project
 
operating
 
each
resource
 
area
 
to
 
depletion,
 
with
 
crews
 
and
 
equipment
 
scheduled
 
to
 
move
 
to
 
subsequent
mining
 
areas
 
as
 
depletion
 
occurs.
 
Underground
 
mine
 
operations
 
are
 
projected
 
to
 
be
exhausted in 2042, surface mines deplete in 2051 and the highwall miners finish in 2053.
13.1
 
Geotech and Hydrology
Mining plans for
 
potential underground mines
 
were developed by
 
Coronado and MM&A.
 
Pillar
stability was tested
 
by MM&A using the
Analysis of Coal
 
Pillar Stability (ACPS)
 
program that
was
 
developed
 
by
 
the
National
 
Institute
 
for
 
Occupational
 
Safety
 
and
 
Health
 
(
NIOSH
)
.
 
MM&A reviewed
 
the results
 
from the
 
ACPS and
 
ALPS analysis
 
and considered
 
them in
 
the
development of the LOM plan.
For the HWM operation,
 
Mining cuts are approximately
 
2.9 meters wide, and
 
cuts are typically
laid out
 
on approximately
 
5.03-meter centers.
 
A 2.1-meter
 
to 2.4-meter
 
solid coal
 
fender is
left
 
in
 
place
 
between
 
cuts.
 
The
 
mining
 
plan
 
provides
 
that
 
larger
 
barrier
 
pillars
 
be
 
provided
periodically,
 
depending
 
on
 
overburden
 
depth
 
and
 
characteristics
 
and
 
the
 
immediate
 
roof
composition, typically after
 
15 to 20
 
cuts.
 
Although this plan,
 
with minor variations,
 
is common
throughout Appalachia, specific rock
 
and coal strength
 
information is used to
 
verify whether or
not this plan provided a sufficient factor of safety.
Hydrology has not been an issue of concern at Logan.
 
Based on numerous site visits to both
the surface and underground portions
 
of the Property by
 
the QPs, it has
 
been determined that
this is not a significant concern.
 
Mining of future reserves is projected
 
to occur in areas which
exhibit similar hydrogeological characteristics as those formerly mined areas.
13.2
 
Production Rates
Operations at Logan by Coronado
 
and its predecessors have been
 
on-going for many years.
 
The
 
mine
 
plan
 
and
 
productivity
 
expectations reflect
 
historical
 
performance
 
and
 
efforts
 
have
been made
 
to adjust
 
the plan
 
to reflect
 
future conditions.
 
MM&A is
 
confident
 
that the
 
mine
plan
 
is reasonably
 
representative
 
to provide
 
an
 
accurate
 
estimation of
 
coal
 
reserves.
 
Mine
development and operation have not been optimized within the TRS.
Carlson
 
Mining
 
software was
 
used
 
by
 
MM&A to
 
generate
 
mine
 
plans
 
for
 
the mineable
 
coal
seams.
 
Mine plans were sequenced based on productivity schedules provided by Coronado,
which were based
 
on historically achieved
 
productivity levels.
 
All production forecasting
 
ties
assumed production rates to
 
geological models as
 
constructed by MM&A’s team of geologists
and mining engineers.
The projected underground
 
mines are set
 
up similarly to
 
the four currently
 
active operations.
 
Each
 
mine
 
is
 
scheduled
 
to
 
operate
 
one
 
to
 
three
 
production
 
sections.
 
All
 
sections
 
are
 
 
ex963p2i0.jpg
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
37
configured as
 
full supersections
 
with two continuous
 
miners per
 
section.
 
In all cases,
 
mines
are forecasted
 
to produce
 
coal two
 
or three
 
shifts each
 
day.
 
In most
 
cases the
 
third shift
 
is
reserved
 
for
 
maintenance
 
and
 
belt
 
and
 
power
 
moves.
 
Production
 
is
 
scheduled
 
Monday
through Friday each week, and every other Saturday.
Three surface resource
 
areas were modeled.
 
Mining operations are projected
 
to utilize area
mining
 
as
 
well
 
as
 
contour
 
mining
 
(
CTR
)
 
methods.
 
The
 
projected
 
operations
 
will
 
employ
equipment capable of a combined production rate
 
of approximately 11,100 bcm/shift between
two spreads
 
of equipment
 
in 2026.
 
In 2027,
 
additional equipment
 
is added
 
in order
 
to increase
production levels to 19,100 bcm/shift.
 
Further equipment is projected for 2032 and beyond in
order to
 
increase production
 
levels for
 
the remaining
 
LOM production
 
to 27,100
 
bcm/shift.
 
The
production model assumes that the
 
mines continue at this
 
production rate until 2047
 
when the
equipment
 
suites
 
are
 
selectively
 
phased
 
out
 
of
 
production
 
due
 
to
 
a
 
reduction
 
in
 
available
working areas.
 
Final surface production
 
ceases in
 
2051 as the
 
last permitted
 
area is depleted,
whereas the
 
HWM production
 
finishes in
 
2053.
 
The models
 
assume that
 
the operations
 
will
work two, 10-hour
 
production shifts, 5
 
days per week
 
plus every other
 
Saturday, with sufficient
staffing to
 
float vacation
 
during the
 
year.
 
A total
 
of 115 employees
 
are assumed
 
for the
 
surface
mines at full production.
Coals from
 
the surface
 
operations are
 
hauled to
 
the loadout
 
for direct
 
ship or
 
to the
 
preparation
plant for washing ultimately
 
to be blended
 
to shipment’s specifications.
 
Saleable product from
the surface
 
operations is
 
projected to
 
be sold
 
primary into
 
the thermal
 
coal market
 
on a
 
raw
basis; however, some production is planned to be washed for the metallurgical coal market.
 
The
 
three
 
areas
 
planned
 
for
 
highwall
 
mining
 
are
 
assumed
 
to
 
be
 
mined
 
by
 
a
 
contractor;
therefore,
 
the contractor
 
costs
 
included in
 
the financial
 
model
 
assume that
 
the contractor
 
is
responsible for staffing those operations along with providing necessary equipment capital.
Spoil for
 
final highwall
 
reclamation is
 
expected to
 
come from
 
strategic placement
 
of spoil
 
on
pre-existing
 
benches
 
by
 
haul
 
trucks
 
such
 
that
 
they
 
are
 
within
 
the
 
push
 
distance
 
of
 
the
reclamation dozer.
 
13.3
 
Mining Related Requirements
13.3.1
 
Underground
A mine plan
 
with sequenced mining
 
projections was prepared
 
for each logical
 
mining unit.
 
For
each mine plan, the appropriate number of production units is selected for the resource area,
and a productivity level assigned, expressed in
 
meters of advance per unit-shift of production.
 
The
 
productivity
 
is based
 
on the
 
equipment and
 
personnel
 
configuration, mining
 
height
 
and
expected physical conditions.
 
13.3.2
 
Surface Mine
A mine
 
plan with
 
sequenced mining
 
projections was
 
prepared for
 
each logical
 
mining unit.
 
The
mobile
 
equipment
 
spreads
 
selected
 
are
 
representative
 
of
 
Coronado’s
 
equipment
 
fleets
 
and
deemed to be appropriate for the local mining conditions.
 
 
ex963p2i0.jpg
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
38
13.3.3
 
HWM
Contract HWM units are available
 
for assignment to contour surface mining
 
pits in the Logan
County
 
Division.
 
HWM substantially
 
increases
 
coal
 
recovery
 
from
 
contour
 
mining
 
benches
and is ideally suited for coal resource areas characterized by thin coal seams and irregular or
narrow boundaries that
 
are not well-suited
 
for underground
 
mining.
 
The contour
 
mining bench
will extend
 
into the
 
highwall to
 
the maximum
 
overburden stripping
 
ratio that
 
is economically
feasible or the minimum bench requirement for operation of the HWM unit.
 
13.4
 
Required Equipment and Personnel
13.4.1
 
Underground Mines
13.4.1.1
 
Powellton No. 1
The Powellton No. 1 Mine is active
 
with one continuous mining section.
 
The Upper Powellton
seam is accessed
 
via a shallow
 
slope and crop.
 
This mine produces
 
metallurgical coal from
leased mineral.
Production is
 
scheduled for
 
approximately 265 days
 
each year,
 
which represents production
on Monday through
 
Friday and every
 
other Saturday.
 
On each day,
 
two production sections
are scheduled
 
to produce
 
coal on
 
two shifts;
 
the third
 
shift is
 
reserved for
 
maintenance and
mine
 
conveyor belt
 
and
 
power moves.
 
The production
 
section
 
is configured
 
as a
 
full super
section with two continuous miners.
 
Productivity is planned at the rate of 48.8 meters to 76.6
meters
 
of
 
advance
 
(55.5
 
meters
 
to
 
87.2
 
meters
 
of
 
retreat).
 
A
 
total
 
of
 
50
 
employees
 
are
assigned to the mine.
Principal production equipment
 
includes two continuous
 
miners, two roof bolters,
 
four shuttle
cars, and
 
two scoops.
 
Coal is
 
extracted from
 
the production
 
face with
 
the continuous
 
miner
and hauled to the mine conveyor
 
in shuttle cars.
 
At the conveyor belt, the
 
coal is discharged
from
 
the
 
shuttle
 
cars
 
onto
 
a
 
feeder
 
breaker
 
for
 
transfer
 
onto
 
the
 
conveyor.
 
The
 
conveyors
carry the coal to
 
the outside, where it is
 
transported via overland conveyor to
 
the preparation
plant and load-out.
 
The Powellton No. 1 Mine
 
is an operating facility; all
 
necessary infrastructure and utilities are
in place.
 
All necessary permits have been obtained.
 
Estimated expenditures for site closure
and reclamation are included in
 
the financial model for this
 
site.
 
Expected annual production
averages
 
approximately
 
204,000
 
marketable
 
tonnes.
 
The
 
mine
 
is
 
scheduled
 
to
 
terminate
during 2042.
13.4.1.2
 
Lower War Eagle
The Lower
 
War
 
Eagle Mine
 
is active
 
with three
 
production sections.
 
The Lower
 
War
 
Eagle
seam is
 
accessed via
 
an existing
 
slope.
 
This mine
 
is a
 
metallurgical coal
 
operation with
 
all
remaining production on leased mineral property.
Production is
 
scheduled for
 
approximately 265 days
 
each year,
 
which represents production
on Monday through Friday
 
and every other Saturday.
 
On each day, three production sections
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
39
are scheduled
 
to produce
 
coal on
 
two shifts;
 
the third
 
shift is
 
reserved for
 
maintenance and
mine conveyor belt and power
 
moves.
 
The sections are configured
 
as one single section
 
with
one
 
continuous
 
miner
 
and
 
two
 
super
 
sections
 
with
 
two
 
continuous
 
miners
 
available
 
for
production.
 
Productivity is planned at the rate
 
of 34.8 meters to 78.8 meters
 
of advance (40.3
meters to 90.9 meters
 
of retreat) per shift
 
of operation.
 
A total of
 
176 employees are assigned
to the mine.
Principal production equipment
 
includes two continuous
 
miners, two roof bolters,
 
four shuttle
cars, and
 
two scoops.
 
Coal is
 
extracted from
 
the production
 
face with
 
the continuous
 
miner
and hauled to the mine conveyor
 
in shuttle cars.
 
At the conveyor belt, the
 
coal is discharged
from
 
the
 
shuttle
 
cars
 
onto
 
a
 
feeder
 
breaker
 
for
 
transfer
 
onto
 
the
 
conveyor.
 
The
 
conveyors
carry the coal
 
to the outside, where
 
it is transported
 
to the preparation
 
plant and load-out
 
via
overland conveyor.
 
The Lower War Eagle Mine
 
is an operating
 
facility; all necessary
 
infrastructure and utilities
 
are
in place.
 
All necessary permits have been obtained.
 
Estimated expenditures for site closure
and reclamation are included in
 
the financial model for this
 
site.
 
Expected annual production
averages
 
approximately
 
684,000
 
marketable
 
tonnes.
 
The
 
mine
 
is
 
scheduled
 
to
 
terminate
during 2033.
 
13.4.1.3
 
Eagle No. 1/Toney Fork #1
The Eagle No.
 
1 (Toney Fork #1) Mine is
 
an active mine
 
in the
 
Eagle (No. 2
 
Gas Lower) seam.
 
This mine is
 
a metallurgical coal
 
operation on
 
leased mineral property
 
and is accessed
 
via drift
entries from the outcrop.
Production is
 
scheduled for
 
approximately 265 days
 
each year,
 
which represents production
on Monday through Friday
 
and every other Saturday.
 
On each day, three production sections
are scheduled
 
to produce
 
coal on
 
two shifts;
 
the third
 
shift is
 
reserved for
 
maintenance and
mine
 
conveyor
 
belt
 
and
 
power
 
moves.
 
All
 
three
 
sections
 
are
 
full
 
super
 
sections
 
with
 
two
continuous
 
miners
 
per
 
section.
 
Productivity
 
is
 
planned
 
at
 
the
 
rate
 
of
 
37.2
 
meters
 
to
 
52.2
meters of advance
 
per shift (44.2
 
meters to 62.2
 
meters of retreat)
 
for the super
 
sections.
 
A
total of 177 employees are assigned to the mine.
Principal production equipment
 
per section includes
 
two continuous miners,
 
two roof bolters,
four
 
shuttle
 
cars,
 
and
 
two
 
scoops.
 
Coal
 
is
 
extracted
 
from
 
the
 
production
 
face
 
with
 
the
continuous miner
 
and hauled to
 
the mine conveyor
 
in shuttle cars.
 
At the
 
conveyor belt, the
coal is discharged onto a feeder breaker for transfer onto the conveyor.
 
The conveyors carry
the
 
coal
 
to
 
the
 
outside,
 
where
 
it
 
is
 
stacked
 
on
 
the
 
ground
 
to
 
await
 
truck
 
transport
 
to
 
the
preparation plant and load-out.
The Eagle
 
No. 1
 
Mine is
 
an operating
 
facility; all
 
necessary infrastructure
 
and utilities
 
are in
place.
 
All necessary permits
 
have been obtained;
 
the underground footprint
 
area expansion
is pending
 
final approval.
 
Estimated expenditures
 
for mine
 
closure and
 
site reclamation
 
are
included in the financial model.
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
40
Expected annual production averages approximately 697,000 marketable tonnes.
The mine is scheduled to terminate during 2041.
 
13.4.1.4
 
Muddy Bridge
The Muddy Bridge Mine is an active mine in the Eagle (No. 2 Gas
 
Lower) seam.
 
This mine is
a metallurgical coal
 
operation on leased
 
mineral property and
 
is accessed via
 
drift entries from
the outcrop.
Production is
 
scheduled for
 
approximately 265 days
 
each year,
 
which represents production
on Monday through Friday plus
 
every other Saturday.
 
On each day,
 
two production sections
are scheduled
 
to produce
 
coal on
 
two shifts;
 
the third
 
shift is
 
reserved for
 
maintenance and
mine conveyor belt and power
 
moves.
 
The sections are configured
 
as full super sections
 
with
two continuous miners available
 
for production on each
 
section.
 
Productivity is planned at
 
the
rate of 43.3 meters to
 
62.5 meters of advance and
 
retreat per shift of operation.
 
A total of 114
employees are assigned to the mine.
Principal production equipment
 
includes two continuous
 
miners, two roof bolters,
 
four shuttle
cars, and
 
two scoops.
 
Coal is
 
extracted from
 
the production
 
face with
 
the continuous
 
miner
and hauled to the mine conveyor
 
via shuttle cars.
 
At the conveyor belt, the coal
 
is discharged
from the
 
haulage units onto
 
a feeder breaker
 
for transfer
 
onto the
 
conveyor.
 
The conveyors
carry the coal to
 
the outside, where it
 
is stacked on the
 
ground to await truck
 
transport to the
Lower War
 
Eagle mine
 
for placement
 
onto the
 
overland conveyor
 
leading to
 
the preparation
plant and load-out.
The Muddy Bridge Mine is an operating facility; all necessary infrastructure and utilities are in
place.
 
All necessary
 
permits have been
 
obtained.
 
Coal mining
 
permits are routinely
 
obtained.
 
Estimated
 
expenditures
 
for
 
mine
 
closure
 
and
 
site
 
reclamation
 
are
 
included
 
in
 
the
 
financial
model.
Expected
 
annual
 
production
 
averages
 
approximately
 
712,000
 
marketable
 
tonnes
 
at
 
steady
state production levels.
The mine is scheduled to terminate during 2027.
13.4.1.5
 
Elklick Chilton
The proposed
 
Elklick Chilton
 
Mine is
 
scheduled to
 
begin production
 
in 2027.
 
The Chilton
 
seam
is
 
accessed
 
via
 
drift
 
entry.
 
The
 
seam
 
is
 
above
 
drainage.
 
This
 
mine
 
is
 
projected
 
to
 
be
 
a
metallurgical coal operation on leased mineral property.
 
Production is
 
scheduled for
 
approximately 265 days
 
each year,
 
which represents production
on Monday
 
through Friday
 
plus every
 
other Saturday.
 
On each day,
 
one production
 
section
is scheduled to
 
produce coal on
 
two shifts;
 
the third
 
shift is reserved
 
for maintenance
 
and mine
conveyor belt and power
 
moves.
 
The sections are configured as
 
full super sections with
 
two
continuous miners available
 
for production on
 
each section.
 
Productivity is
 
planned at the
 
rate
 
 
ex963p2i0.jpg
Coronado
 
Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
41
of
 
73.2
 
meters
 
of
 
advance
 
(109.8
 
meters
 
of
 
retreat)
 
per
 
shift
 
of
 
operation.
 
A
 
total
 
of
 
50
employees are assigned to the mine.
Principal production equipment
 
includes two continuous
 
miners, two roof bolters,
 
four shuttle
cars, and
 
two scoops.
 
Coal is
 
extracted from
 
the production
 
face with
 
the continuous
 
miner
and hauled to the mine conveyor
 
via shuttle cars.
 
At the conveyor belt, the coal
 
is discharged
from the
 
haulage units onto
 
a feeder breaker
 
for transfer
 
onto the
 
conveyor.
 
The conveyors
carry the coal to
 
the outside, where it
 
is stacked on the
 
ground to await truck
 
transport to the
preparation plant and load-out.
 
The Elklick
 
Chilton mine
 
is a
 
permitted mine
 
with surface
 
infrastructure in
 
place.
 
The proposed
mine
 
is
 
located
 
in
 
an
 
area
 
with
 
a
 
long
 
history
 
of
 
coal
 
mining,
 
with
 
numerous
 
permitted
operations in
 
close proximity.
 
Estimated expenditures
 
for mine
 
closure and
 
site reclamation
are included in the financial model.
Expected
 
annual
 
production
 
averages
 
approximately
 
290,000
 
marketable
 
tonnes
 
at
 
steady
state production levels.
The mine is scheduled to begin production in 2027 and terminate during 2040.
13.4.1.6
 
Camp Branch Chilton
The Camp Branch
 
Chilton Mine is
 
proposed mine in
 
the Chilton seam
 
which is accessed
 
via
drift
 
entry
 
from
 
the
 
outcrop
 
and
 
is
 
scheduled
 
to
 
begin
 
production
 
in
 
2027.
 
This
 
mine
 
is
 
a
metallurgical coal operation on leased mineral property.
Production is
 
scheduled for
 
approximately 265 days
 
each year,
 
which represents production
on Monday
 
through Friday
 
plus every
 
other Saturday.
 
On each day,
 
one production
 
section
is scheduled to
 
produce coal on
 
two shifts;
 
the third
 
shift is reserved
 
for maintenance and
 
mine
conveyor belt and power
 
moves.
 
The sections are configured as
 
full super sections with two
continuous miners available
 
for production on
 
each section.
 
Productivity is
 
planned at the
 
rate
of
 
73.2
 
meters
 
of
 
advance
 
(109.8
 
meters
 
of
 
retreat)
 
per
 
shift
 
of
 
operation.
 
A
 
total
 
of
 
50
employees are assigned to the mine.
Principal production equipment
 
includes two continuous
 
miners, two roof bolters,
 
four shuttle
cars, and
 
two scoops.
 
Coal is
 
extracted from
 
the production
 
face with
 
the continuous
 
miner
and hauled to the mine conveyor
 
via shuttle cars.
 
At the conveyor belt, the coal
 
is discharged
from the
 
haulage units onto
 
a feeder breaker
 
for transfer
 
onto the
 
conveyor.
 
The conveyors
carry the coal to
 
the outside, where it
 
is stacked on the
 
ground to await truck
 
transport to the
preparation plant and load-out.
Due
 
to the
 
projected starting
 
date
 
for the
 
Camp Branch
 
Chilton Mine,
 
no detailed
 
design of
infrastructure or surface facilities has been completed to date.
 
The proposed mine is located
in the Appalachian Basin, which has an extensive
 
history (>100 years) of coal mining.
 
There
is a sufficient population base
 
within commuting distance of
 
the proposed operation; no
 
Camp
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance
 
with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
42
or Town
 
construction will be required.
 
Estimated mine access and utility capital expenditures
are included in the financial model for the mine.
The proposed Camp Branch Chilton Mine has an existing permit.
 
Estimated expenditures for
mine closure and site reclamation are included in the financial model.
Expected
 
annual
 
production
 
averages
 
approximately
 
335,000
 
marketable
 
tonnes
 
at
 
steady
state production levels.
The mine is scheduled to begin production in 2027 and terminate during 2032.
13.4.1.7
 
Winifrede
The
 
proposed
 
Winifrede
 
(North
 
Fork)
 
Mine
 
is
 
scheduled
 
to
 
begin
 
production
 
in
 
2023.
 
The
Upper
 
Winifrede
 
seam
 
is
 
accessed
 
via
 
drift
 
along
 
the
 
outcrop.
 
This
 
mine
 
is
 
permitted
 
and
projected to be a metallurgical coal operation on leased mineral property.
 
Production is
 
scheduled for
 
approximately 265 days
 
each year,
 
which represents production
on Monday
 
through Friday
 
plus every
 
other Saturday.
 
On each day,
 
one production
 
section
is scheduled to
 
produce coal on
 
two shifts;
 
the third
 
shift is reserved
 
for maintenance
 
and mine
conveyor
 
belt
 
and
 
power
 
moves.
 
The
 
section
 
is
 
configured
 
as
 
a
 
super
 
section
 
with
 
two
continuous
 
miners
 
per
 
section
 
available
 
for
 
production.
 
Productivity
 
is
 
planned
 
at
 
the
 
38.1
meters to 45.1 meters
 
of advance (53.4 meters
 
to 63.1 meters of
 
retreat) per shift.
 
A total of
38 employees are assigned to the mine.
Principal production equipment
 
per section includes
 
two continuous miners,
 
two roof bolters,
four
 
shuttle
 
cars,
 
and
 
one
 
scoop.
 
Coal
 
is
 
extracted
 
from
 
the
 
production
 
face
 
with
 
the
continuous miner
 
and hauled to
 
the mine conveyor
 
in shuttle cars.
 
At the
 
conveyor belt, the
coal is discharged from
 
the shuttle cars onto a
 
feeder breaker for transfer onto
 
the conveyor.
 
The conveyors carry
 
the coal to
 
the outside, where
 
it is stacked
 
on the ground
 
to await truck
transport to the preparation plant and load-out.
There is an existing mine faceup
 
constructed for seam access.
 
The proposed mine is located
in the Appalachian Basin, which has an extensive
 
history (>100 years) of coal mining.
 
There
is a sufficient population base
 
within commuting distance of
 
the proposed operation; no
 
Camp
or Town
 
construction will be required.
 
The
 
proposed
 
Winifrede
 
Mine
 
at
 
North
 
Fork
 
is
 
permitted.
 
Estimated
 
expenditures
 
for
 
mine
closure and site reclamation are included in the financial model.
Expected
 
annual
 
production
 
averages
 
approximately
 
215,000
 
marketable
 
tonnes
 
at
 
steady
state levels.
 
The mine is scheduled to begin production in 2023 and terminate during 2024.
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
43
13.4.1.8
 
Lower Powellton
The
 
proposed Lower
 
Powellton
 
Mine
 
is scheduled
 
to begin
 
production in
 
2031.
 
The Lower
Powellton seam is accessed via a proposed drift along the outcrop.
 
This mine is projected to
be a metallurgical coal operation on leased mineral property.
Production is
 
scheduled for
 
approximately 265 days
 
each year,
 
which represents production
on Monday through Friday plus
 
every other Saturday.
 
On each day,
 
two production sections
are scheduled
 
to produce
 
coal on
 
two shifts;
 
the third
 
shift is
 
reserved for
 
maintenance and
mine conveyor belt
 
and power moves.
 
Both sections are
 
configured as a
 
super section with
two continuous miners
 
per section available
 
for production.
 
Productivity is planned
 
at the 73.2
meters of
 
advance per
 
shift (85.4
 
meters of
 
retreat per
 
shift).
 
A total
 
of 114
 
employees are
assigned to the mine during steady state production.
Principal production equipment
 
per section includes
 
two continuous miners,
 
two roof bolters,
four
 
shuttle
 
cars,
 
and
 
one
 
scoop.
 
Coal
 
is
 
extracted
 
from
 
the
 
production
 
face
 
with
 
the
continuous miner
 
and hauled to
 
the mine conveyor
 
in shuttle cars.
 
At the
 
conveyor belt, the
coal is discharged from
 
the shuttle cars onto a
 
feeder breaker for transfer onto
 
the conveyor.
 
The conveyors carry
 
the coal to
 
the outside, where
 
it is stacked
 
on the ground
 
to await truck
transport to
 
the preparation plant
 
and load-out.
 
The truck haul
 
cost is estimated
 
to be $1.98
per tonne.
Due
 
to
 
the
 
projected
 
starting
 
date
 
for
 
the
 
Lower
 
Powellton
 
Mine,
 
no
 
detailed
 
design
 
of
infrastructure or surface facilities has been completed to date.
 
The proposed mine is located
in the Appalachian Basin, which has an extensive
 
history (>100 years) of coal mining.
 
There
is a sufficient population base
 
within commuting distance of
 
the proposed operation; no
 
Camp
or Town
 
construction will be required.
 
Estimated mine access and utility capital expenditures
are included in the financial model for the mine.
Due
 
to
 
the
 
projected
 
start-up
 
date
 
of
 
the
 
Lower
 
Powellton
 
Mine,
 
no
 
permit
 
work
 
has
 
been
completed to date.
 
The proposed mine
 
is located in
 
an area with
 
a long history
 
of coal mining,
with
 
numerous
 
permitted
 
operations
 
in
 
close
 
proximity.
 
Coal
 
mining
 
permits
 
are
 
routinely
obtained.
 
Estimated expenditures
 
for mine
 
closure and
 
site reclamation
 
are included
 
in the
financial model for each mine or plant site.
Expected
 
annual
 
production
 
averages
 
approximately
 
521,000
 
marketable
 
tonnes
 
at
 
steady
state levels.
 
The mine is scheduled to begin production in 2031 and terminate during 2041.
13.4.1.9
 
Upper Winifrede
The
 
proposed
 
Upper Winifrede
 
Mine
 
is
 
scheduled
 
to
 
begin
 
production
 
in
 
2032.
 
The
 
Upper
Winifrede seam is accessed via a proposed drift
 
along the outcrop.
 
This mine is projected to
be a metallurgical coal operation on leased mineral property.
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
44
Production is
 
scheduled for
 
approximately 265 days
 
each year,
 
which represents production
on Monday
 
through Friday
 
plus every
 
other Saturday.
 
On each day,
 
one production
 
section
is scheduled to
 
produce coal on
 
two shifts;
 
the third
 
shift is reserved
 
for maintenance
 
and mine
conveyor belt and power
 
moves.
 
The sections are configured as
 
full super sections with two
continuous miners available
 
for production on
 
each section.
 
Productivity is
 
planned at the
 
rate
of 73.2 meters of advance per shift of operation.
 
A total of 50 employees are assigned to the
mine.
Principal production equipment
 
includes two continuous
 
miners, two roof bolters,
 
four shuttle
cars, and
 
two scoops.
 
Coal is
 
extracted from
 
the production
 
face with
 
the continuous
 
miner
and hauled to the mine conveyor
 
in shuttle cars.
 
At the conveyor belt, the
 
coal is discharged
from
 
the
 
shuttle
 
cars
 
onto
 
a
 
feeder
 
breaker
 
for
 
transfer
 
onto
 
the
 
conveyor.
 
The
 
conveyors
carry the coal to
 
the outside, where it
 
is stacked on the
 
ground to await truck
 
transport to the
preparation plant and load-out.
 
The truck haul cost is estimated to be $4.03 per tonne.
Due
 
to
 
the
 
projected
 
starting
 
date
 
for
 
the
 
Upper
 
Winifrede
 
Mine,
 
no
 
detailed
 
design
 
of
infrastructure or surface facilities has been completed to date.
 
The proposed mine is located
in the Appalachian Basin, which has an extensive
 
history (>100 years) of coal mining.
 
There
is a sufficient population base
 
within commuting distance of
 
the proposed operation; no
 
Camp
or Town
 
construction will be required.
 
Estimated mine access and utility capital expenditures
are included in the financial model for the mine.
Due
 
to
 
the
 
projected
 
start-up
 
date
 
of
 
the
 
Upper
 
Winifrede
 
Mine,
 
no
 
permit
 
work
 
has
 
been
completed to date.
 
The proposed mine
 
is located in
 
an area with
 
a long history
 
of coal mining,
with
 
numerous
 
permitted
 
operations
 
in
 
close
 
proximity.
 
Coal
 
mining
 
permits
 
are
 
routinely
obtained.
 
Estimated expenditures
 
for mine
 
closure and
 
site reclamation
 
are included
 
in the
financial model for each mine or plant site.
Expected
 
annual
 
production
 
averages
 
approximately
 
417,000
 
marketable
 
tonnes
 
at
 
steady
state levels.
 
The mine is scheduled to begin production in 2032 and terminate during 2036.
At the underground mines, ventilation fans are installed to provide a
 
sufficient volume of air to
ventilate
 
production
 
sections,
 
coal
 
haulage
 
and
 
transport
 
entries,
 
battery
 
charging
 
stations,
and
 
transformers
 
in
 
accordance
 
with
 
approved
 
plans.
 
High-voltage
 
cables
 
deliver
 
power
throughout the mine where transformers reduce voltage for specific equipment
 
requirements.
 
The Mine
 
Improvement and
 
New Emergency
 
Response Act
 
of 2006
 
(
MINER Act
) requires
 
that
carbon monoxide detection
 
systems be
 
installed along
 
mine conveyor
 
belts and
 
that electronic
two-way
 
tracking and
 
communications
 
systems be
 
installed
 
throughout underground
 
mines.
 
Water is required to control dust at production sections
 
and along conveyor belts, and to cool
electric motors.
 
Water is available
 
from nearby sources and
 
is distributed within the
 
mine by
pipelines as required.
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
45
13.4.2
 
Surface Mines and Highwall Miners
Mining
 
operations
 
are
 
projected
 
to
 
utilize
 
area
 
mining
 
as
 
well
 
as
 
contour
 
mining
 
(
CTR
)
methods.
 
The projected operations will employ equipment capable of a combined production
rate of
 
approximately 6,500
 
bcm/shift in
 
2022 between
 
two spreads
 
of equipment
 
in 2022
 
to
16,700 bcm/shift between three spreads
 
of equipment in 2026.
 
In 2027, additional equipment
is
 
added
 
in
 
order
 
to
 
increase
 
production
 
levels
 
to
 
19,100
 
bcm/shift.
 
Further
 
equipment
 
is
projected for
 
2032 and
 
beyond in
 
order to
 
increase production
 
levels for
 
the remaining
 
LOM
production
 
to
 
27,100
 
bcm/shift.
 
The
 
production
 
model
 
assumes
 
that
 
the
 
mines
 
continue
 
at
this
 
production
 
rate
 
until
 
2048
 
when
 
the
 
equipment
 
suites
 
are
 
selectively
 
phased
 
out
 
of
production due to a reduction in available working areas.
 
All surface and/or HWM production
finishes in
 
2053.
 
The models
 
assume that
 
the operations
 
will work
 
two, 10-hour
 
production
shifts,
 
5
 
days
 
per
 
week
 
plus
 
every
 
other
 
Saturday,
 
with
 
sufficient
 
staffing
 
to
 
float
 
vacation
during the year.
 
A total of 115 employees are assumed for the surface mines.
It is assumed that most of
 
the spoil movement goes through a
 
shovel or loader bucket and is
eventually returned to
 
the pit for
 
final reclamation.
 
The dozer’s
 
primary responsibility is
 
cutting
the initial benches for the drill and shaping the reclaimed contour highwall.
 
All
 
highwall
 
mining
 
are
 
assumed
 
to
 
be
 
performed
 
by
 
a
 
contractor.
 
The
 
contractor
 
is
responsible for staffing those operations along with providing necessary equipment capital.
Spoil for
 
final highwall
 
reclamation is
 
expected to
 
come from
 
strategic placement
 
of spoil
 
on
pre-existing
 
benches
 
by
 
haul
 
trucks
 
such
 
that
 
they
 
are
 
within
 
the
 
push
 
distance
 
of
 
the
reclamation dozer.
 
13.4.2.1
 
Toney Fork
Toney
 
Fork
 
surface
 
mining
 
operations
 
are
 
projected
 
to
 
be
 
mined
 
from
 
2022
 
to
 
2039,
 
with
emphasis
 
placed
 
on
 
preparing
 
space
 
for
 
HWM
 
operations.
 
Expected
 
production
 
for
 
the
operations average approximately 372,000 marketable tonnes.
The Toney
 
Fork HWM operates in 2023 to 2043 and mines an additional 252,000 marketable
tonnes at steady state levels.
13.4.2.2
 
Buffalo Creek South
The
 
Buffalo
 
Creek
 
South
 
surface
 
and/or
 
HWM
 
mining
 
operations
 
are
 
projected
 
to
 
operate
between
 
2027
 
and
 
2053,
 
with
 
emphasis
 
placed
 
on
 
preparing
 
space
 
for
 
HWM
 
operations.
 
Expected
 
surface
 
production
 
for
 
the
 
operations
 
totals
 
approximately
 
383,000
 
marketable
tonnes
 
at
 
steady
 
state
 
levels.
 
The
 
Buffalo
 
Creek
 
HWM
 
mines
 
an
 
additional
 
287,000
marketable tonnes at steady state levels.
13.4.2.3
 
Sugar Camp
Sugar
 
Camp
 
surface
 
mining
 
operations
 
are
 
projected
 
to
 
be
 
mined
 
from
 
2032
 
to
 
2051.
 
Expected production for the operations average approximately 267,000 marketable tonnes.
 
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
46
The
 
Sugar
 
Camp
 
HWM
 
operates
 
from
 
2040
 
to
 
2047
 
and
 
mines
 
an
 
additional
 
265,000
marketable tonnes.
As shown
 
in
Tables 13-1 through
 
13-3
, the
 
areas planned
 
for underground
 
production continue
until 2042, whereas surface and
 
auger/HWM production is projected to
 
finish in 2053.
 
Clean
coal production varies directly
 
with coal thickness in
 
the case of the underground
 
mines, and
overburden removal for the surface mines.
Table 13-1:
 
Underground Summary of Production by Year (000)
Mine Name
2022
2023
2024
2025
2026
2027
2028
2029
Camp Br Chilton
0
0
0
0
0
125
371
344
Eagle No. 1 (Toney
Fork)
786
805
778
769
744
767
764
749
Elk Lick Chilton
0
0
0
0
0
56
250
255
Lower Powellton
0
0
0
0
0
0
0
0
Lower War Eagle
615
652
639
664
706
756
841
790
Powellton No. 1
40
0
33
205
205
206
203
205
Muddy Br No.2 Gas
683
660
689
804
786
565
0
0
Upper Winifrede
0
0
0
0
0
0
0
0
Winifrede (Chilton
Rider)
0
215
63
0
0
0
0
0
 
Total
2,123
2,332
2,202
2,442
2,441
2,475
2,429
2,342
 
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
47
Mine Name
2030
2031
2032
2033
2034
2035
2036
2037
Camp Br Chilton
338
288
142
0
0
0
0
0
Eagle No. 1 (Toney
Fork)
701
650
625
640
662
687
728
580
Elk Lick Chilton
271
283
303
252
272
308
371
327
Lower Powellton
0
166
495
510
490
503
508
517
Lower War Eagle
721
452
179
90
0
0
0
0
Powellton No. 1
212
209
209
213
215
201
196
199
Muddy Br No.2 Gas
0
0
0
0
0
0
0
0
Upper Winifrede
0
0
230
564
378
309
314
0
Winifrede (Chilton
Rider)
0
0
0
0
0
0
0
0
 
Total
2,243
2,049
2,183
2,267
2,016
2,008
2,117
1,623
Mine Name
2038
2039
2040
2041
2042
2043
2044
2045
Camp Br Chilton
0
0
0
0
0
0
0
0
Eagle No. 1 (Toney
Fork)
417
197
169
287
0
0
0
0
Elk Lick Chilton
320
323
217
0
0
0
0
0
Lower Powellton
510
502
658
236
0
0
0
0
Lower War Eagle
0
0
0
0
0
0
0
0
Powellton No. 1
197
198
189
188
156
0
0
0
Muddy Br No.2 Gas
0
0
0
0
0
0
0
0
Upper Winifrede
0
0
0
0
0
0
0
0
Winifrede (Chilton
Rider)
0
0
0
0
0
0
0
0
 
Total
1,444
1,220
1,234
711
156
0
0
0
Table 13-2:
 
Surface Summary of Production by Year (000)
Mine Name
2022
2023
2024
2025
2026
2027
2028
2029
Toney
 
Fork Surf
126
380
530
563
525
243
196
291
Buffalo Cr South
Area
0
0
0
0
0
287
522
555
Sugar Camp Area 1
0
0
0
0
0
0
0
0
 
Total
126
380
530
563
525
530
718
846
 
 
 
 
 
 
 
 
 
Mine Name
2030
2031
2032
2033
2034
2035
2036
2037
Toney
 
Fork Surf
411
291
266
322
452
431
476
318
Buffalo Cr South
Area
476
463
407
481
434
248
241
174
Sugar Camp Area 1
0
0
141
346
466
387
363
50
 
Total
887
754
815
1,149
1,352
1,066
1,079
543
 
 
 
 
 
 
 
 
 
Mine Name
2038
2039
2040
2041
2042
2043
2044
2045
Toney
 
Fork Surf
627
248
0
0
0
0
0
0
Buffalo Cr South
Area
257
351
310
379
441
227
562
372
Sugar Camp Area 1
135
34
77
165
149
510
283
398
 
Total
1,020
633
387
544
590
737
845
770
 
 
 
 
 
 
 
 
 
Mine Name
2046
2047
2048
2049
2050
2051
2052
2053
Toney
 
Fork Surf
0
0
0
0
0
0
0
0
Buffalo Cr South
Area
459
582
460
41
0
0
0
0
Sugar Camp Area 1
421
374
378
117
160
265
0
0
 
Total
880
955
838
158
160
265
0
0
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
48
Table 13-3:
 
Highwall Summary of Production by Year (000)
Mine Name
2022
2023
2024
2025
2026
2027
2028
2029
Toney
 
Fork HWM
0
207
171
207
101
227
253
182
Buffalo Cr South
HWM
0
0
0
0
0
164
261
208
Sugar Camp HWM
0
0
0
0
0
0
0
0
 
Total
0
207
171
207
101
391
514
390
 
 
 
 
 
 
 
 
 
Mine Name
2030
2031
2032
2033
2034
2035
2036
2037
Toney
 
Fork HWM
0
0
195
421
401
200
281
332
Buffalo Cr South
HWM
196
148
246
319
337
194
276
357
Sugar Camp HWM
0
0
0
0
0
0
0
0
 
Total
196
148
441
740
738
394
556
688
 
 
 
 
 
 
 
 
 
Mine Name
2038
2039
2040
2041
2042
2043
2044
2045
Toney
 
Fork HWM
298
264
214
289
291
171
0
0
Buffalo Cr South
HWM
254
319
286
220
406
0
0
34
Sugar Camp HWM
0
0
80
81
15
272
267
243
 
Total
552
582
580
590
713
443
267
277
 
 
 
 
 
 
 
 
 
Mine Name
2046
2047
2048
2049
2050
2051
2052
2053
Toney
 
Fork HWM
0
0
0
0
0
0
0
0
Buffalo Cr South
HWM
302
338
368
277
386
299
318
21
Sugar Camp HWM
388
156
0
0
0
0
0
0
 
Total
690
494
368
277
386
299
318
21
14
Processing and Recovery Methods
14.1
 
Description or Flowsheet
The Logan County Division includes the Saunders Preparation Plant in addition to the mines.
 
The
 
plant
 
site
 
includes raw
 
coal
 
storage,
 
clean
 
coal
 
storage,
 
a
 
railroad
 
loadout,
 
and
 
refuse
disposal
 
area.
 
The
 
plant
 
has
 
a
 
feed
 
rate
 
capacity
 
of
 
1,088
 
raw
 
tonnes
 
per
 
hour.
 
Primary
separation
 
equipment
 
includes
 
a
 
heavy
 
media
 
vessel,
 
heavy
 
media
 
cyclones,
 
classifying
cyclones,
 
spirals,
 
flotation
 
cells,
 
and
 
column
 
flotation,
 
supported
 
by
 
the
 
requisite
 
screens,
centrifuges, vacuum filters, sumps, pumps,
 
and distribution systems.
 
Coarse and fine refuse
are disposed separately in an adjacent refuse area which incorporates slurry cells.
Processes and
 
equipment are
 
typical of
 
those used
 
in the
 
coal industry
 
and are
 
in use
 
in nearly
all plants in the Central Appalachian Basin.
 
14.2
 
Requirements for Energy, Water,
 
Material and Personnel
Personnel have historically
 
been sourced from
 
the surrounding communities
 
in Logan, Boone,
Wyoming, and
 
Mingo counties, and
 
have proven
 
to be adequate
 
in numbers to
 
operate past
and current mines.
 
As mining is common in the surrounding
 
areas, the workforce is generally
familiar with mining practices and is comprised of a strong talent pool of experienced miners.
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
49
Water is sourced locally from Buffalo Creek
 
Public Service District and/or
 
locally from streams
via water withdrawal permits, and electricity is sourced from AEP.
 
The service industry in the
areas surrounding the
 
mine complex has
 
historically provided supplies,
 
equipment repairs
 
and
fabrication, etc.
 
15
Infrastructure
The
 
Coronado-owned
 
Saunders
 
Preparation
 
Plant
 
services
 
the
 
mines.
 
The
 
ROM
 
coal
 
is
delivered from the
 
Powellton No. 1,
 
Eagle No. 1,
 
Muddy Bridge and
 
Lower War
 
Eagle Mines
via overland conveyor, all remaining
 
production is or
 
will be delivered
 
to the plant site
 
by truck.
The CSX rail line serves as the main means of transport from the mine complex/loadout.
As an active operation, the necessary support infrastructure for Logan is in place.
As
 
new
 
areas
 
are
 
developed,
 
the
 
infrastructure
 
requirements
 
will
 
change.
 
These
 
changes
have been considered in the LOM plans and financial model.
Most of the seams lie
 
below drainage; however, several metallurgical coal seams are
 
situated
above drainage.
 
The underground mining resource
 
areas which are located
 
above-drainage
require
 
an
 
access
 
road
 
and
 
mine
 
access
 
development
 
along
 
the
 
outcrop,
 
whereas
 
below-
drainage mines are
 
accessed based on
 
other proposed surface
 
infrastructure locations and/or
surface property
 
control.
 
In some
 
cases, the access
 
and face-up may
 
be developed
 
as part
of
 
surface mining
 
activities.
 
A
 
mine
 
transformer and
 
water
 
tank are
 
located
 
at
 
the face-up,
along with the mine fan, stacker conveyor, supply facilities, shop, office, and bath house.
The surface
 
mining mobile
 
equipment spreads
 
advance the contour
 
and area
 
mining pits
 
while
systematically reclaiming the trailing
 
side of pits
 
where coal has
 
been removed.
 
The coal haul
roads
 
are
 
extended
 
and
 
maintained
 
as
 
the
 
pits
 
advance.
 
Support
 
facilities
 
are
 
maintained
nearby but
 
away from
 
the active
 
mining, and
 
include storage
 
areas for
 
blasting agents,
 
fuel
and lubricants, and mine supplies along with maintenance facilities and offices.
The HWM equipment
 
advances along with
 
the contour mining
 
pits.
 
The rate of
 
advance of the
contour
 
mining
 
is
 
somewhat
 
constrained
 
by
 
the
 
advancement
 
rate
 
of
 
the
 
HWM.
 
A
 
diesel-
powered
 
generator
 
trails
 
the
 
highwall
 
miner
 
and
 
powers
 
the
 
continuous
 
mining
 
unit.
 
Other
support facilities are provided along with the contour mining support facilities.
 
A map of the existing facilities in
Figure 15-1
 
shows the layout of the required infrastructure.
 
 
ex963p2i0.jpg
 
ex963p59i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
50
Figure 15-1:
 
Logan Surface Facilities
16
Market Studies
16.1
 
Market Description
The
 
quality
 
characteristics
 
for
 
the
 
subject
 
coal
 
resources
 
and
 
coal
 
reserves
 
have
 
been
reviewed in detail by MM&A.
 
The drill hole data were utilized to develop average coal quality
characteristics
 
for
 
the
 
mining
 
site.
 
These
 
average
 
coal
 
quality
 
characteristics
 
were
 
then
utilized as the basis for determining the
 
various markets into which the
 
saleable coal will likely
be placed.
 
The projected quality specifications for the Logan products are as shown in
Table 16-1
.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
51
Table 16-1:
 
Quality Specifications by Product
 
HVA
HVB
Thermal
(A/R)
Moisture (%)
7.50
8.00
7.50
Ash (%)
7.50
8.00
12.50
Sulfur (%)
0.90
0.95
1.00
Volatile Matter (%)
32.5
37.0
36.0
Btu/lb.
N/A
N/A
12,300
Fluidity (ddpm)
30,000
25,000
N/A
MMR (%)
1.04
0.93
N/A
CSR
62
58
N/A
FSI
8.00
8.00
N/A
Note:
 
All Specs are dry basis except Moisture and
 
Thermal
The mine production serves the both the high-volatile metallurgical and the thermal markets.
16.2
 
Price Forecasts
Coronado provided
 
MM&A with
 
price forecasts
 
for its
 
active operations.
 
Customer coal
 
pricing
is
 
derived
 
from
 
market
 
observed
 
forward
 
estimates
 
based
 
on
 
global
 
economic
 
supply
 
and
demand
 
analysis
 
which
 
is
 
applied
 
to
 
mine
 
plan
 
sales
 
volumes
 
and
 
product
 
mix
 
and
 
is
supplemented with Coronado’s
 
in-house knowledge of applicable
 
rail transportation charges,
ocean
 
freight
 
charges
 
and
 
port
 
charges.
 
MM&A
 
utilized
 
this
 
data
 
for
 
price
 
forecasting
 
in
financial
 
modeling.
 
Concurrent
 
with
 
aforementioned-quality
 
parameters
 
in
 
the
 
preceding
section,
 
production
 
from
 
the
 
proposed
 
operations
 
is
 
assumed
 
to
 
be
 
primarily
 
sold
 
in
metallurgical markets with limited thermal sales.
 
Pricing was provided through calendar year
2050 (after which sales prices were held constant).
 
Coal
 
price
 
forecasts
 
for
 
the
 
Logan
 
products
 
were
 
provided
 
by
 
Coronado
 
for
 
various
 
coal
markets in terms of US nominal dollars per metric tonne.
 
16.3
 
Contract Requirements
Some
 
contracts
 
are
 
necessary
 
for
 
successful
 
marketing
 
of
 
the
 
coal.
 
For
 
Logan,
 
since
 
all
mining, preparation and marketing is done in-house, the remaining contracts required are:
>
Transportation
 
– The Mine contracts with the CSX Railroad to transport the coal to either
the domestic customers or to the Pier 6 and Dominion terminals at Norfolk, Virginia for
overseas shipment.
>
Sales
– Sales contracts are a mix of spot and contract sales.
 
With the volatility of the
market, long-term contracts are not typically written.
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
52
17
Environmental Studies, Permitting and Plans,
Negotiations or
 
Agreements with Local
Individuals
 
17.1
 
Results of Studies
MM&A
 
completed
 
a
 
Limited
 
Phase
 
I
 
Environmental
 
Site
 
Assessment
 
(
ESA
)
 
on
 
the
 
Logan
Property in May 2017 on behalf of
 
Coronado.
 
Coronado reports not having conducted such
 
a
study
 
since
 
the
 
MM&A
 
studies.
 
The
 
ESA
 
completed
 
by
 
MM&A
 
included
 
a
 
site
 
inspection,
review of
 
historical records,
 
a database
 
search of
 
State and
 
Federal regulatory
 
records and
interviews
 
to
 
identify potential
 
recognized environmental
 
conditions (
RECs
) that
 
may
 
create
environmental liability
 
for the
 
sites.
 
MM&A concluded
 
that no
 
long-term
 
liabilities existed
 
at
the time of these ESAs.
Based on
 
these former
 
ESAs completed
 
by MM&A,
 
it is
 
the QPs’
 
opinion that
 
Logan has
 
a
generally typical coal industry record of compliance with applicable mining, water quality, and
environmental
 
laws.
 
Estimated
 
costs
 
for
 
mine
 
closure,
 
including
 
water
 
quality
 
monitoring
during site reclamation, are included in the financial models.
17.2
 
Requirements and Plans for Waste Disposal
The
 
original
 
design
 
for
 
the
 
North
 
Fork
 
Refuse
 
Area
 
(
North
 
Fork
)
 
at
 
the
 
Logan
 
Property
projected a
 
crest to
 
elevation 686 meters.
 
The present
 
elevation of
 
the deck
 
is ±685meters.
 
In
 
2018
 
MSHA approved
 
an
 
expansion plan
 
to
 
raise
 
the
 
cross-valley crest
 
to
 
elevation
 
802
meters, and
 
from there
 
converting to
 
a sidehill
 
fill.
 
This will
 
allow for
 
a total
 
volume of
 
50 million
CM
 
which
 
would
 
be
 
sufficient
 
capacity
 
for
 
all
 
the
 
refuse
 
generated
 
by
 
the
 
LOM
 
plan
 
that
underpins the
 
current Logan County
 
Division reserves.
 
Further plans
 
for the
 
North Fork
 
site
call for
 
conversion of the
 
fill to a
 
total cross-valley configuration,
 
predicated on completion
 
of
surface mining
 
on the
 
ridge between
 
North Fork
 
and
 
Middle Fork.
 
This has
 
the potential
 
of
providing an additional 10 million CM of capacity.
17.3
 
Permit Requirements and Status
All mining operations are subject to federal
 
and state laws and must obtain permits
 
to operate
mines,
 
coal
 
preparation
 
and
 
related
 
facilities,
 
haul
 
roads,
 
and
 
other
 
incidental
 
surface
disturbances necessary for mining to occur.
 
Permits generally require that the permittee post
a performance bond
 
in an
 
amount established
 
by the regulatory
 
program to provide
 
assurance
that
 
any
 
disturbance
 
or
 
liability
 
created
 
during
 
mining
 
operations
 
is
 
properly
 
restored
 
to
 
an
approved post-mining
 
land use
 
and
 
that all
 
regulations and
 
requirements of
 
the permits
 
are
fully satisfied before
 
the bond is
 
returned to the
 
permittee.
 
Significant penalties exist
 
for any
permittee
 
who
 
fails
 
to
 
meet
 
the
 
obligations
 
of
 
the
 
permits
 
including
 
cessation
 
of
 
mining
operations, which can lead to potential forfeiture
 
of the bond.
 
Any company, and its directors,
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
53
owners and officers,
 
which are subject
 
to bond forfeiture
 
can be denied
 
future permits under
the program.
1
New permits
 
or permit
 
revisions will
 
occasionally be
 
necessary to
 
facilitate the
 
expansion or
addition of new mining areas
 
on the properties, such as
 
amendments to existing permits and
new
 
permits
 
for
 
mining
 
of
 
reserve
 
areas.
 
Exploration
 
permits
 
also
 
are
 
required.
 
Property
under lease
 
includes provisions
 
for exploration
 
among the
 
terms of
 
the lease.
 
New or
 
modified
mining permits
 
are subject
 
to a
 
public advertisement
 
process and
 
comment period,
 
and the
public is provided
 
an opportunity to
 
raise objections
 
to any proposed
 
mining operation.
 
MM&A
is not aware
 
of any specific
 
prohibition of mining
 
on the subject
 
property and
 
given sufficient
time and
 
planning, Coronado
 
should be
 
able to
 
secure new
 
permits to
 
maintain
 
its planned
mining operations within the context of current regulations.
 
Necessary permits are in place to
support current
 
production on the
 
properties, but
 
future permits are
 
required to maintain
 
and
expand
 
production.
 
Portions
 
of
 
the
 
properties
 
are
 
located
 
near
 
local
 
communities.
 
Regulations
 
prohibit
 
mining
 
activities
 
within
 
91.4
 
meters
 
of
 
a
 
residential
 
dwelling,
 
school,
church,
 
or
 
similar
 
structure
 
unless
 
written
 
consent
 
is
 
first
 
obtained
 
from
 
the
 
owner
 
of
 
the
structure.
 
Where
 
required,
 
such
 
consents
 
have
 
been
 
obtained
 
where
 
mining
 
is
 
proposed
beyond the regulatory limits.
Coronado has obtained all mining
 
and discharge permits to operate
 
its mines and processing,
loadout or related facilities.
 
MM&A is unaware of any obvious or current Coronado permitting
issues that are expected to prevent the issuance of future permits.
 
Logan, along with all coal
producers,
 
is
 
subject
 
to
 
a
 
level
 
of
 
uncertainty
 
regarding
 
future
 
clean
 
water
 
permits
 
due
 
to
United States Environmental Protection Agency
(
EPA
)
 
involvement with state programs.
The Mining permits currently held by Logan are shown in
Table 17-1.
1
 
Monitored under the Applicant Violator System (AVS) by the Federal Office of Surface Mining.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
54
Table 17-1:
 
Logan Mining Permits
Type
Permit ID
Permit Name
$ Bond
Current Status
Issued
Date
Expiration Date
Hectares
NPDES No.
Other
O001984
 
North Fork Refuse
1
$1,033,200
Renewed
4/11/1984
4/11/2024
116.03
WV0095699
Other - Loadout Only
O009283
 
Elk Lick Dock
$33,000
Renewed
6/10/1983
6/10/2023
13.31
WV1023071
Other
O009883
 
Saunders Prep Plant
$223,200
Renewed
6/24/1983
6/24/2023
36.04
WV0095699
Other - Refuse
Disposal
O012383
 
Middle Fork Refuse
1
$364,800
Renewed
9/27/1983
9/27/2023
46.13
WV0096156
Other - Loadout Only
O500513
 
Toney Fork Loadout
 
$32,000
Renewed
9/11/2014
9/11/2024
12.67
WV1028081
Other - Refuse
Disposal
O501108
Elklick Branch Haulroad/Refuse
1
 
$281,600
Renewed
11/13/2008
11/13/2023
5.83
WV1029843
Coal Surface Mine
S500417
 
North Fork Winifrede Contour Mine
 
$390,000
Not Started
2/13/2018
2/13/2023
50.59
WV1028430
Coal Surface Mine
S500709
 
Toney Fork Surface Mine No. 3
 
$2,625,000
Renewed
11/20/2013
11/20/2023
340.83
WV1019902
Coal Surface Mine
S501210
 
Toney Fork West Surface Mine
 
$1,670,000
Inactive
2/29/2012
2/28/2022
134.30
WV1024990
Coal Surface Mine
S501410
 
Elklick Surface Mine
 
$2,760,800
Inactive
8/16/2013
8/16/2023
327.47
WV1025015
Coal Surface Mine
S503395
 
TONEY FORK SURFACE #2
 
$5,605,000
Renewed
5/28/1998
5/28/2023
453.61
WV1016750
Coal Underground
U004485
 
Dingess Br. No. 1
$0
Completely
Released
6/12/1985
PHII Released
4.05
WV1008340
Coal Underground
U400299
 
Paynter Branch Mine No. 1
 
$81,000
Renewed
4/5/2002
4/5/2022
10.01
WV1018728
Coal Underground
U500109
 
Chilton Deep Mine No. 1
 
$30,800
Inactive
1/31/2011
1/31/2026
5.53
WV1019821
Coal Underground
U500789
WA #1 Mine
$0
Completely
Released
 
7/31/1990
PHII Released
0
WV0096385
Coal Underground
U500919
North Fork Winifrede Deep Mine
$12,240
New
03/03/2020
3/3/2025
2.21
Coal Underground
U501311
 
Eagle No. 1 Mine
 
$91,080
Not Started
5/20/2013
5/20/2023
14.71
WV1025139
Coal Underground
U502008
 
Dingess Br-Chilton Mine No. 2
 
$42,920
Phase 1 Released
10/10/2008
PHI Released
11.62
WV1029908
Coal Underground
U505392
 
ALMA NO. 1 MINE
 
$283,480
Renewed
3/3/1995
3/3/2025
39.25
WV1013408
Coal Underground
U506686
Camp Branch Deep Mine
$96,200
Renewed
1/26/1987
1/26/1997
26.24
WV0093122
Coal Surface Mine
S500615
 
Toney Fork A-Ridge Surface Mine
 
$80,000
Phase 1 Released
2/24/2016
2/24/2026
15.80
WV1028278
Coal Underground
U501015
 
CB Chilton #1 Mine
 
$10,600
Not Started
12/28/2016
12/28/2021
1.68
WV1028316
Coal Underground
U503496
Muddy Bridge Branch #1
$35,280
Renewed
08/04/1997
08/04/2022
5.46
WV1016954
Coal Underground
U503596
Muddy Bridge Branch #2
$65,520
Renewed
08/04/1997
08/04/2022
10.35
WV1016954
River Dock
810-8037
Big Sandy Dock
$210,700
In-Active
7/10/1986
7/10/2021
2.99
KYG040724
Notes:
 
 
1.
 
Permits containing refuse placement.
 
2.
 
Does not include prospect permits.
 
 
ex963p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
55
17.4
 
Local Plans, Negotiations or Agreements
MM&A found no indication of agreements beyond the scope of Federal or State Regulations.
17.5
 
Mine Closure Plans
Applicable
 
regulations
 
require
 
that
 
mines
 
be
 
properly
 
closed,
 
and
 
reclamation
 
commenced
immediately upon abandonment.
 
In general, site reclamation includes
 
removal of structures,
backfilling, regrading, and revegetation of disturbed areas.
 
For surface mines, the majority of
the expense
 
for backfilling and
 
regrading is completed
 
as part of
 
ongoing mining operations,
with only
 
reclamation of
 
final pits
 
and HWM
 
benches required
 
at end-of-mine
 
life.
 
Sediment
control is required
 
during the
 
establishment of
 
vegetation, and
 
bond release
 
generally requires
a
 
minimum
 
five-year
 
period
 
of
 
site
 
maintenance,
 
water
 
sampling,
 
and
 
sediment
 
control
following
 
mine
 
completion.
 
This
 
requirement is
 
reduced
 
to two
 
years for
 
certain
 
operations
involving re-mining.
 
Reclamation of underground mines includes closure and sealing of mine
openings such as portals and shafts in addition to the items listed above.
 
Estimated costs
 
for mine
 
closure, including
 
water quality
 
monitoring during
 
site reclamation,
are included in the financial models.
 
As with all mining companies, an
 
accretion calculation is
performed annually so the necessary
 
Asset Retirement Obligations (
ARO
) can be shown as
 
a
Liability on the Balance Sheet.
17.6
 
Qualified Person’s Opinion
The Logan complex is an
 
operating facility; all necessary permits
 
for current production have
been obtained.
 
The QPs know
 
of no reason that any
 
permits revisions that may be
 
required
cannot be obtained.
 
Estimated expenditures for site
 
closure and reclamation
 
are included in the
 
financial model for
this site.
18
Capital and Operating Costs
18.1
 
Capital Cost Estimate
The production sequence selected for a property must consider the proximity of each reserve
area to coal preparation
 
plants, river docks and
 
railroad loading points, along
 
with suitability of
production equipment
 
to coal
 
seam conditions.
 
The in-place
 
infrastructure was
 
evaluated, and
any
 
future
 
needs
 
were
 
planned
 
to
 
a
 
level
 
suitable
 
for
 
a
 
Preliminary
 
Feasibility
 
Study
 
and
included in the Capital Forecast.
Coronado
 
provided
 
MM&A
 
with
 
an
 
inventory
 
of
 
operating
 
equipment
 
available
 
at
 
Logan.
 
MM&A’s
 
capital
 
schedules
 
assume
 
that
 
major
 
equipment
 
rebuilds
 
occur
 
over
 
the
 
course
 
of
each machine’s
 
remaining assumed
 
operating life.
 
Replacement equipment
 
was scheduled
based
 
on
 
MM&A’s
 
experience
 
and
 
knowledge
 
of
 
mining
 
equipment
 
and
 
industry
 
standards
 
 
ex963p2i0.jpg ex963p14i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
56
with respect
 
to the useful
 
life of such
 
equipment.
 
As one mine
 
is depleted, the
 
equipment is
moved to its replacement.
A summary of the estimated capital for the Property is provided in
Figure 18-1
 
below.
 
Figure 18-1:
 
CAPEX
18.2
 
Operating Cost Estimate
Coronado
 
provided
 
historical
 
and
 
a
 
preliminary
 
5-year
 
projection
 
of
 
operating
 
costs
 
for
MM&A’s review.
 
MM&A used the historical
 
and/or budget cost information
 
as a reference and
developed
 
a
 
personnel schedule
 
for
 
the
 
mine.
 
Hourly
 
labor
 
rates and
 
salaries
 
were
 
based
upon
 
information
 
contained
 
in
 
Coronado’s
 
financial
 
summaries.
 
Fringe
 
benefit
 
costs
 
were
developed for vacation
 
and holidays, federal
 
and state unemployment
 
insurance, retirement,
workers’
 
compensation
 
and
 
pneumoconiosis,
 
casualty
 
and
 
life
 
insurance,
 
healthcare
 
and
bonuses.
 
A
 
cost
 
factor
 
for
 
mine
 
supplies
 
was
 
developed
 
that
 
relates
 
expenditures
 
to
 
mine
advance rates for roof control costs and other mine supply costs experienced at underground
mines.
 
Other factors were developed for maintenance and repair costs, rentals, mine power,
outside services and other direct mining costs.
 
Other cost factors were
 
developed for coal
 
preparation plant processing,
 
refuse handling, coal
loading, property taxes, and insurance and bonding.
 
Appropriate royalty rates were assigned
for
 
production
 
from
 
leased
 
coal
 
lands
 
and
 
sales
 
taxes
 
were
 
calculated
 
for
 
state
 
severance
taxes, the federal black lung excise tax, and federal and state reclamation fees.
Mandated Sales Related Costs such as Black Lung Excise are summarized in
Table
 
18-1
.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
57
Table 18-1:
 
Estimated Coal Production Taxes and Sales Costs
Description of Tax or Sales Cost
Basis of Assessment
Cost
Federal Black Lung Excise Tax -
Underground
Per Tonne
$1.21
Federal Black Lung Excise Tax - Surface
Per Tonne
$0.61
Federal Black Lung Excise Tax - Highwall
Miner
Per Tonne
$0.61
Federal Reclamation Fees – Underground
Per Tonne
$0.13
Federal Reclamation Fees – Surface
Per Tonne
$0.31
Federal Reclamation Fees - Highwall Miner
Per Tonne
$0.31
West Virginia Reclamation Tax
 
-
Underground
Per Tonne
$0.308
West Virginia Reclamation Tax
 
- Surface
Per Tonne
$0.308
West Virginia Reclamation Tax
 
- Highwall
Miner
Per Tonne
$0.308
West Virginia Severance Tax
Percentage of Revenue
1 to 5%
Royalties – Underground
Percentage of Revenue
5 to 8%
Royalties – Surface
Percentage of Revenue
9%
Royalties - Highwall Miner
Percentage of Revenue
9%
Notes: 1. Federal black lung excise tax is paid
 
only on coal sold domestically.
 
MM&A assumed
45% of total coal sales to be domestic in the economic
 
analysis discussed below.
A summary of the projected Operating Costs is in
Table
 
18-2
.
Table 18-2:
 
Logan Operating Costs
 
 
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
Remainin
g
LOM
Average
 
Total
2022
2023
2024
2025
2026
2027
2028
2029
ROM Production Tonnes
 
146.4
 
 
5.8
 
 
7.2
 
 
7.2
 
 
8.2
 
 
7.8
 
 
8.0
 
 
7.8
 
 
7.8
 
 
3.5
 
Yield
50.16%
39.12
%
40.50
%
40.20
%
39.27
%
39.32
%
42.21
%
47.16
%
45.81
%
55.94%
Saleable Production
Tonnes
*
 
73.4
 
 
2.2
 
 
2.9
 
 
2.9
 
 
3.2
 
 
3.1
 
 
3.4
 
 
3.7
 
 
3.6
 
 
1.9
 
Thermal Tonnes
 
4.30
 
 
0.04
 
 
0.11
 
 
0.16
 
 
0.17
 
 
0.16
 
 
0.13
 
 
0.16
 
 
0.20
 
 
0.13
 
Domestic Met Tonnes
 
69.14
 
 
2.21
 
 
2.81
 
 
2.74
 
 
3.04
 
 
2.91
 
 
3.26
 
 
3.50
 
 
3.38
 
 
1.81
 
Export Met Tonnes
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
Total Saleable Tonnes
 
73.44
 
 
2.25
 
 
2.92
 
 
2.90
 
 
3.21
 
 
3.07
 
 
3.40
 
 
3.66
 
 
3.58
 
 
1.94
 
Cash Costs per Tonne:
Mining Costs
$65.37
$61.54
 
$59.28
 
$61.82
 
$60.25
 
$63.24
 
$62.37
 
$60.89
 
$61.61
 
 
$67.44
 
Processing and Transport
 
$15.93
 
$17.85
 
$17.36
 
$14.27
 
$14.04
 
$14.48
 
$14.42
 
$13.96
 
$14.43
 
 
$16.44
 
Sales Related Costs
 
$15.22
 
$15.64
 
$12.12
 
$11.13
 
$12.16
 
$12.11
 
$13.44
 
$13.79
 
$13.85
 
 
$16.37
 
G&A
 
$2.08
 
 
$2.73
 
 
$2.16
 
 
$2.11
 
 
$1.96
 
 
$2.06
 
 
$2.06
 
 
$2.06
 
 
$2.06
 
 
$2.06
 
 
Total Cash Costs
 
$98.61
 
$97.76
 
$90.92
 
$89.32
 
$88.41
 
$91.89
 
$92.29
 
$90.70
 
$91.95
 
 
$102.31
 
* The Financial model includes 0.03 million tonnes of inferred coal production.
 
Inferred coal represents 0.04% of the total
production, and none of this coal was included in the estimate of reserves.
19
Economic
 
Analysis
19.1
 
Assumptions, Parameters and Methods
A pre-feasibility LOM
 
plan was prepared
 
by MM&A for
 
the Logan operations.
 
MM&A prepared
mine
 
projections
 
and
 
production
 
timing
 
forecasts
 
based
 
on
 
coal
 
seam
 
characteristics.
 
Production
 
timing
 
was
 
carried
 
out
 
from
 
2022
 
to
 
depletion
 
(exhaustion)
 
of
 
the
 
coal
 
reserve
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
58
areas, which is projected
 
for the year 2053.
 
All costs and
 
prices are based on
 
2021 nominal
United States dollars.
The
 
Mine
 
plan,
 
productivity
 
expectations
 
and
 
cost
 
estimates
 
generally
 
reflect
 
historical
performance
 
by
 
Coronado
 
and
 
efforts
 
have
 
been
 
made
 
to
 
adjust
 
plans
 
and
 
costs
 
to
 
reflect
future conditions.
 
MM&A is confident
 
that the mine
 
plan and
 
financial model are
 
reasonably
representative to provide an accurate estimation of coal reserves.
Capital
 
schedules
 
were
 
developed
 
by
 
MM&A for
 
mine
 
development,
 
infrastructure,
 
and
 
on-
going capital
 
requirements for
 
the life
 
of the
 
mine.
 
Staffing levels
 
were prepared,
 
and operating
costs estimated by
 
MM&A.
 
MM&A utilized historical
 
cost data provided by
 
Coronado and its
own knowledge and experience to estimate direct and indirect operating costs.
 
The preliminary
 
feasibility financial
 
model, prepared
 
for this
 
TRS, was
 
developed to
 
test the
economic viability
 
of the coal
 
reserve area.
 
The results
 
of this
 
financial model
 
are not intended
to represent a bankable feasibility study, required for financing of any current or future mining
operations, but are
 
intended to
 
prove the economic
 
viability of the
 
estimated coal reserves.
 
All
costs
 
and
 
prices are
 
based on
 
2021
 
nominal United
 
States dollars
 
assuming
 
a 2%
 
inflation
rate.
On an
 
unlevered basis,
 
the NPV
 
of the
 
project cash
 
flows after
 
taxes was
 
estimated for
 
the
purpose
 
of
 
classifying
 
coal
 
reserves.
 
The
 
project
 
cash
 
flows,
 
excluding
 
debt
 
service,
 
are
calculated by subtracting
 
direct and indirect
 
operating expenses and
 
capital expenditures from
revenue.
 
Direct costs
 
include labor, drilling
 
and blasting,
 
operating supplies, maintenance
 
and
repairs, facilities costs for
 
materials handling, coal
 
preparation, refuse disposal,
 
coal loading,
sampling
 
and
 
analysis services,
 
reclamation and
 
general and
 
administrative costs.
 
Indirect
costs include statutory and legally
 
agreed upon fees related
 
to direct extraction of
 
the mineral.
 
The
 
indirect
 
costs
 
are
 
the
 
Federal
 
black
 
lung
 
tax,
 
Federal
 
and
 
State
 
reclamation
 
taxes,
property
 
taxes,
 
local
 
transportation
 
prior
 
to
 
delivery
 
at
 
rail
 
or
 
barge
 
loading
 
sites,
 
coal
production
 
royalties,
 
sales
 
and
 
use
 
taxes,
 
income
 
taxes
 
and
 
State
 
severance
 
taxes.
 
Coronado’s historical costs provided a useful reference for MM&A’s
 
cost estimates.
Sales
 
revenue
 
is
 
based
 
on
 
the
 
metallurgical
 
coal
 
price
 
information
 
provided
 
to
 
MM&A
 
by
Coronado.
Projected debt
 
service is
 
excluded from
 
the P&L
 
and cash
 
flow model
 
in order
 
to determine
Enterprise Value.
The financial model expresses coal sales prices, operating
 
costs, and capital expenditures in
current
 
day
 
dollars
 
without
 
adjustment
 
for
 
inflation.
 
Capital
 
expenditures
 
and
 
reclamation
costs
 
are
 
included
 
based
 
on
 
engineering
 
estimates
 
for
 
each
 
mine
 
by
 
year.
 
The
 
Coronado
division’s existing allocations of administrative costs are continued in the future projections.
Coronado will pay royalties
 
for the various
 
current and projected
 
operations.
 
The royalty rates
vary by mining method and location.
 
The royalty rates for Logan are estimated to be 5 to 9%
of the sales revenue.
 
 
ex963p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
59
The
 
projection
 
model
 
also
 
includes
 
consolidated
 
income
 
tax
 
calculations
 
at
 
the
 
Coronado
level,
 
incorporating
 
statutory
 
depletion
 
calculations,
 
as
 
well
 
as
 
state
 
income
 
taxes,
 
and
 
a
federal
 
tax
 
rate
 
of
 
21%.
 
To
 
the
 
extent
 
the
 
mine
 
generates
 
net
 
operating
 
losses
 
for
 
tax
purposes, the losses are carried over to offset future taxable income.
 
The terms “cash flows”
and “project cash flows” used in this report refer to after tax cash flows.
Consolidated
 
cash
 
flows
 
are
 
driven
 
by
 
annual
 
sales
 
tonnage,
 
which
 
at
 
steady-state
 
level
ranges
 
from
 
a
 
peak
 
of
 
4.2
 
million
 
tonnes
 
in
 
2033
 
to
 
a
 
low
 
of
 
1.0
 
million
 
tonnes
 
in
 
2045.
 
Projected consolidated revenue
 
ranges from $150.1
 
million to $537.5
 
million at steady
 
state.
 
Revenue totals $10.0 billion for the project’s life.
Consolidated cash flow from operations is positive throughout the projected operating period,
with
 
the
 
exception
 
of
 
post-production
 
years,
 
due
 
to
 
end-of-mine
 
reclamation
 
spending.
 
Consolidated cash flow from operations peaks at $136.5 million
 
in 2034 and totals $2.4 billion
over the project’s
 
life.
 
Capital expenditures total
 
$141.2 million from
 
2022 through 2026
 
and
$709.4 million over the project’s life.
 
Coal price forecasts
 
for coal
 
products were prepared
 
by Coronado
 
for its proposed
 
operations.
 
Such
 
prices
 
were used
 
for
 
the
 
revenue
 
input
 
into
 
the financial
 
model.
 
Sales
 
variable costs
such as production royalties and severance taxes were based upon the revenue input.
19.2
 
Results
The pre-feasibility financial model,
 
prepared by MM&A for
 
this TRS, was developed
 
to test the
economic
 
viability
 
of
 
each
 
coal
 
resource
 
area.
 
The
 
results
 
of
 
this
 
financial
 
model
 
are
 
not
intended
 
to
 
represent
 
a
 
bankable
 
feasibility
 
study,
 
as
 
may
 
be
 
required
 
for
 
financing
 
of
 
any
current
 
or
 
future
 
mining
 
operations
 
contemplated
 
but
 
are
 
intended
 
to
 
prove
 
the
 
economic
viability of the estimated coal
 
reserves.
 
Optimization of the LOM plan was
 
outside the scope
of the engagement.
Figure 19-1
 
shows the
 
annual variance
 
of cash
 
costs per
 
ton.
 
Table 19-1
 
shows LOM
 
tonnage,
P&L, and EBITDA for Logan.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex963p69i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
60
Figure 19-1:
 
Cash Costs per Tonne
As shown
 
above, the
 
Logan’s average cash
 
cost ranges
 
between approximately
 
$89 and
 
$116
per tonne for most of the operating period.
Table 19-1:
 
Life-of-Mine Tonnage, P&L before Tax, and EBITDA ($000)
 
LOM
LOM
P&L
LOM
EBITDA
 
Tonnes
*
Pre-Tax P&L
Per Tonne
EBITDA
Per Tonne
Deep Mines
 
 
 
 
 
Camp Br Chilton
 
1,607
 
 
$32,285
 
 
$20.08
 
 
$54,357
 
 
$33.82
 
Eagle No. 1 (Toney Fork)
 
12,504
 
 
$91,928
 
 
$7.35
 
 
$205,032
 
 
$16.40
 
Elk Lick Chilton
 
3,809
 
 
$116,111
 
 
$30.48
 
 
$150,035
 
 
$39.39
 
Lower Powellton
 
5,095
 
 
$102,826
 
 
$20.18
 
 
$164,666
 
 
$32.32
 
Lower War Eagle
 
7,105
 
 
$207,728
 
 
$29.24
 
 
$308,368
 
 
$43.40
 
Powellton No. 1
 
3,677
 
 
$97,593
 
 
$26.54
 
 
$151,180
 
 
$41.12
 
Muddy Br No.2 Gas
 
4,188
 
 
$270,115
 
 
$64.50
 
 
$313,447
 
 
$74.85
 
Upper Winifrede
 
1,794
 
 
$57,593
 
 
$32.11
 
 
$78,591
 
 
$43.82
 
Winifrede (Chilton Rider)
 
278
 
 
$1,052
 
 
$3.79
 
 
$5,158
 
 
$18.58
 
Consolidated Deep Mines
 
40,057
 
 
$977,232
 
 
$24.40
 
 
$1,430,834
 
 
$35.72
 
Surface Mines
Toney Fork Surf
 
6,698
 
 
$30,295
 
 
$4.52
 
 
$142,924
 
 
$21.34
 
Buffalo Cr South Area
 
8,728
 
 
$97,428
 
 
$11.16
 
 
$221,170
 
 
$25.34
 
Sugar Camp Area 1
 
5,221
 
 
$32,688
 
 
$6.26
 
 
$148,325
 
 
$28.41
 
Surface Mines Consolidated
 
20,646
 
 
$160,411
 
 
$7.77
 
 
$512,419
 
 
$24.82
 
Highwall Miner (HWM)
Operations
Toney Fork HWM
 
4,705
 
 
$254,021
 
 
$53.99
 
 
$256,385
 
 
$54.49
 
Buffalo Cr South HWM
 
6,532
 
 
$439,179
 
 
$67.23
 
 
$440,183
 
 
$67.39
 
Sugar Camp HWM
 
1,501
 
 
$98,208
 
 
$65.43
 
 
$98,208
 
 
$65.43
 
HWM Consolidated
 
12,738
 
 
$791,408
 
 
$62.13
 
 
$794,775
 
 
$62.39
 
Grand Total
 
73,441
 
 
$1,929,050
 
 
$26.27
 
 
$2,738,028
 
 
$37.28
 
* The Financial model includes 0.03 million tonnes of inferred coal production.
 
Inferred coal
represents 0.04% of the total production, and none of this coal was included in the estimate of
reserves.
As shown in
Table
 
19-1,
 
the Logan Complex shows positive EBITDA over the LOM.
 
Overall,
Coronado’s consolidated operations show positive LOM P&L
 
and LOM EBITDA of $1.9
 
billion
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
61
and $2.7 billion, respectively.
 
A summary of the
 
key financial performance metrics
 
projected
through 2029 is provided below in
Table 19-2
.
Table 19-2:
 
Summary of Logan Key Financial Performance
 
Metrics (2022-2029)
 
 
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
Remainin
g
LOM
Average
 
Total
2022
2023
2024
2025
2026
2027
2028
2029
ROM Production Tonnes
 
146.4
 
 
5.8
 
 
7.2
 
 
7.2
 
 
8.2
 
 
7.8
 
 
8.0
 
 
7.8
 
 
7.8
 
 
3.5
 
Yield
50.16%
39.12
%
40.50
%
40.20
%
39.27
%
39.32
%
42.21
%
47.16
%
45.81
%
55.94%
Saleable Production
Tonnes
*
 
73.4
 
 
2.2
 
 
2.9
 
 
2.9
 
 
3.2
 
 
3.1
 
 
3.4
 
 
3.7
 
 
3.6
 
 
1.9
 
Thermal Tonnes
 
4.30
 
 
0.04
 
 
0.11
 
 
0.16
 
 
0.17
 
 
0.16
 
 
0.13
 
 
0.16
 
 
0.20
 
 
0.13
 
Domestic Met Tonnes
 
69.14
 
 
2.21
 
 
2.81
 
 
2.74
 
 
3.04
 
 
2.91
 
 
3.26
 
 
3.50
 
 
3.38
 
 
1.81
 
Export Met Tonnes
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
Total Saleable Tonnes
 
73.44
 
 
2.25
 
 
2.92
 
 
2.90
 
 
3.21
 
 
3.07
 
 
3.40
 
 
3.66
 
 
3.58
 
 
1.94
 
Cash Costs per Tonne:
Mining Costs
 
$65.37
 
$61.54
 
$59.28
 
$61.82
 
$60.25
 
$63.24
 
$62.37
 
$60.89
 
$61.61
 
 
$67.44
 
Processing and Transport
 
$15.93
 
$17.85
 
$17.36
 
$14.27
 
$14.04
 
$14.48
 
$14.42
 
$13.96
 
$14.43
 
 
$16.44
 
Sales Related Costs
 
$15.22
 
$15.64
 
$12.12
 
$11.13
 
$12.16
 
$12.11
 
$13.44
 
$13.79
 
$13.85
 
 
$16.37
 
G&A
 
$2.08
 
 
$2.73
 
 
$2.16
 
 
$2.11
 
 
$1.96
 
 
$2.06
 
 
$2.06
 
 
$2.06
 
 
$2.06
 
 
$2.06
 
 
Total Cash Costs
 
$98.61
 
$97.76
 
$90.92
 
$89.32
 
$88.41
 
$91.89
 
$92.29
 
$90.70
 
$91.95
 
 
$102.31
 
EBITDA per Tonne
 
$37.28
 
$89.22
 
$26.97
 
$26.95
 
$34.49
 
$35.09
 
$34.68
 
$32.64
 
$32.66
 
 
$37.31
 
Expansion CapEx ($M)
 
$-
 
 
$-
 
 
$-
 
 
$-
 
 
$-
 
 
$-
 
 
$-
 
 
$-
 
 
$-
 
 
$-
 
Maintenance CapEx ($M)
 
$709.4
 
 
$54.8
 
 
$27.4
 
 
$28.0
 
 
$17.4
 
 
$13.7
 
 
$59.6
 
 
$28.7
 
 
$27.1
 
 
$18.1
 
 
Total CapEx
 
$709.4
 
 
$54.8
 
 
$27.4
 
 
$28.0
 
 
$17.4
 
 
$13.7
 
 
$59.6
 
 
$28.7
 
 
$27.1
 
 
$18.1
 
* The Financial model includes 0.03 million tonnes of inferred coal production.
 
Inferred coal represents 0.04% of the total
production, and none of this coal was included in the estimate of reserves.
After
 
Tax
 
Cash Flows
 
were
 
developed
 
in
 
order to
 
calculate
 
the NPV
 
for
 
this
 
Property.
 
The
NPV is estimated
 
to be $611.3
 
million at a
 
discount rate of
 
10.0%.
 
A summary of
 
the Logan
after-tax cash flow is shown in
Table
 
19-3
.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
62
Table 19-3:
 
Project Cash Flow Summary ($000)
*
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
Total
2022
2023
2024
2025
2026
Production & Sales tonnes
73,441
2,250
2,919
2,903
3,213
3,067
Total
 
Revenue
$9,980,224
$420,654
$344,156
$337,534
$394,845
$389,424
EBITDA
$2,738,028
$200,726
$78,732
$78,233
$110,802
$107,624
Net Income
$1,610,525
$120,459
$34,650
$29,605
$61,436
$59,748
Net Cash Provided by Operating Activities
$2,372,457
$125,587
$89,779
$70,664
$90,037
$94,643
Purchases of Property, Plant, and
Equipment
$(709,361)
$(54,793)
$(27,441)
$(27,989)
$(17,357)
$(13,652)
Net Cash Flow
$1,663,096
$70,794
$62,338
$42,674
$72,680
$80,991
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2027
2028
2029
2030
2031
2032
Production & Sales tonnes
3,396
3,661
3,579
3,326
2,950
3,438
Total
 
Revenue
$431,154
$451,609
$445,987
$420,670
$376,614
$440,781
EBITDA
$117,770
$119,515
$116,897
$111,475
$78,018
$87,218
Net Income
$65,436
$69,828
$70,242
$65,713
$34,306
$33,521
Net Cash Provided by Operating Activities
$100,542
$104,726
$104,191
$100,196
$77,188
$77,404
Purchases of Property, Plant, and
Equipment
$(59,598)
$(28,735)
$(27,081)
$(31,232)
$(48,753)
$(71,927)
Net Cash Flow
$40,944
$75,991
$77,110
$68,964
$28,435
$5,477
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2033
2034
2035
2036
2037
2038
Production & Sales tonnes
4,156
4,105
3,468
3,753
2,854
3,015
Total
 
Revenue
$537,477
$534,901
$465,163
$514,566
$405,973
$421,828
EBITDA
$142,816
$161,080
$119,812
$148,790
$92,000
$117,900
Net Income
$89,651
$103,843
$69,446
$91,589
$53,041
$76,624
Net Cash Provided by Operating Activities
$113,575
$136,352
$113,896
$123,326
$92,161
$99,895
Purchases of Property, Plant, and
Equipment
$(23,808)
$(29,414)
$(13,377)
$(19,641)
$(50,095)
$(29,180)
Net Cash Flow
$89,767
$106,938
$100,519
$103,685
$42,066
$70,715
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2039
2040
2041
2042
2043
2044
Production & Sales tonnes
2,436
2,201
1,845
1,459
1,180
1,112
Total
 
Revenue
$355,369
$338,176
$268,754
$214,586
$172,885
$150,118
EBITDA
$87,011
$83,646
$68,092
$62,920
$44,089
$34,328
Net Income
$55,313
$54,058
$44,925
$45,801
$29,936
$22,534
Net Cash Provided by Operating Activities
$83,815
$71,639
$61,735
$55,327
$42,764
$32,618
Purchases of Property, Plant, and
Equipment
$(15,349)
$(9,482)
$(14,390)
$(5,290)
$(14,378)
$(3,690)
Net Cash Flow
$68,466
$62,157
$47,345
$50,037
$28,386
$28,928
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2045
2046
2047
2048
2049
2050
Production & Sales tonnes
1,047
1,570
1,449
1,206
435
546
Total
 
Revenue
$152,705
$241,778
$219,387
$188,710
$76,217
$101,030
EBITDA
$31,080
$76,832
$69,847
$62,067
$19,753
$38,469
Net Income
$16,163
$53,074
$44,398
$39,304
$4,857
$21,379
Net Cash Provided by Operating Activities
$28,550
$56,069
$60,773
$54,739
$27,203
$29,794
Purchases of Property, Plant, and
Equipment
$(33,303)
$(3,327)
$(23,807)
$(5,664)
$(5,458)
$(1,150)
Net Cash Flow
$(4,752)
$52,742
$36,967
$49,075
$21,745
$28,645
 
 
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex963p72i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
63
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2051
2052
2053
2054
2055
2056
Production & Sales tonnes
564
318
21
-
-
-
Total
 
Revenue
$102,990
$60,217
$3,964
$-
$-
$-
EBITDA
$42,382
$26,401
$1,703
$-
$-
$-
Net Income
$24,434
$24,120
$1,383
$(164)
$(84)
$(43)
Net Cash Provided by Operating Activities
$35,071
$18,199
$3,510
$(1,729)
$(882)
$(899)
Purchases of Property, Plant, and
Equipment
$-
$-
$-
$-
$-
$-
Net Cash Flow
$35,071
$18,199
$3,510
$(1,729)
$(882)
$(899)
* The Financial model includes 0.03 million tonnes of inferred coal production.
 
Inferred coal represents 0.04% of the total
production, and none of this coal was included in the estimate of reserves.
19.3
 
Sensitivity
Sensitivity of
 
the NPV
 
results to
 
changes in
 
the key
 
drivers is
 
presented in
 
the chart
 
below.
 
The sensitivity study
 
shows the NPV
 
at the 10.0%
 
discount rate when
 
Base Case sales
 
prices,
operating costs, and
 
capital costs are increased
 
and decreased in increments
 
of 5% within a
+/- 15% range.
Figure 19-2:
 
Sensitivity of NPV
As shown, NPV
 
is quite sensitive
 
to change in
 
sales price and
 
operating cost estimates,
 
and
slightly sensitive to changes in capital cost estimates.
 
 
ex963p2i0.jpg
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
64
20
Adjacent Properties
20.1
 
Information Used
No Proprietary information associated with neighboring properties was used as part of this
study.
21
Other Relevant Data and Information
MM&A performed
 
a previous
 
audit of
 
all the
 
Properties in
 
year 2017
 
for Coronado
 
based on
SEC
 
Industry
 
Guide
 
7
 
standards.
 
In
 
addition,
 
MM&A
 
completed
 
a
 
Limited
 
Phase
 
I
Environmental Site Assessment
 
(
ESA
) on
 
the Property
 
in 2017
 
on behalf
 
of Coronado.
 
MM&A
conducted
 
a
 
Joint
 
Ore
 
Reserve
 
Committee
 
(
JORC
)
 
compliant
 
resource
 
and
 
reserve
assessment of the
 
assets effective
 
January 1, 2018.
 
By assignment, the
 
JORC assessment
included
 
a
 
preliminary
 
feasibility
 
level
 
study
 
of
 
the
 
subject
 
coal
 
reserves,
 
encompassing
detailed mine
 
planning and
 
cost analysis
 
through depletion
 
of Logan’s
 
JORC-compliant coal
reserves.
 
MM&A utilized
 
this former
 
preliminary feasibility
 
study as
 
the basis
 
of an
 
updated
study which meets those standards set forth by the SEC.
22
Interpretation and Conclusions
22.1
 
Conclusion
Sufficient
 
data
 
has
 
been
 
obtained
 
through
 
various
 
exploration
 
and
 
sampling
 
programs
 
and
mining operations to
 
support the geological
 
interpretations of seam
 
structure and thickness
 
for
coal
 
horizons
 
situated
 
on
 
the
 
Property.
 
The
 
data
 
is
 
of
 
sufficient
 
quantity
 
and
 
reliability
 
to
reasonably support the coal resource and coal reserve estimates in this TRS.
The geological
 
data and
 
preliminary feasibility
 
study,
 
which consider
 
mining plans,
 
revenue,
and
 
operating
 
and
 
capital
 
cost
 
estimates
 
are
 
sufficient
 
to
 
support
 
the
 
classification
 
of
 
coal
reserves provided herein.
This
 
geologic
 
evaluation
 
conducted
 
in
 
conjunction
 
with
 
the
 
preliminary
 
feasibility
 
study
 
is
sufficient to
 
conclude that
 
the 73.4 Mt
 
of marketable
 
coal reserves
 
identified on the
 
Property
are economically
 
mineable under
 
reasonable expectations
 
of market
 
prices for
 
metallurgical
coal products, estimated operation costs, and capital expenditures.
22.2
 
Risk Factors
Risks have been identified for operational, technical and administrative subjects addressed
 
in
the Pre-Feasibility Study.
 
A risk matrix has been
 
constructed to present the risk
 
levels for all
the risk factors
 
identified and quantified
 
in the risk assessment
 
process.
 
The risk matrix
 
and
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
65
risk assessment
 
process are
 
modelled to
 
that presented
 
in the
 
Australian and
 
New Zealand
Standard on Risk Management (AS/NZS 4360).
 
The
 
purpose
 
of
 
the
 
characterization
 
of
 
the
 
project
 
risk
 
components
 
is
 
to
 
inform
 
the
 
project
stakeholders of key aspects of
 
the Coronado projects that can
 
be impacted by events whose
consequences can affect the success of the venture.
 
The significance of an impacted aspect
of the operation is directly related to both the probability of occurrence and the severity of the
consequences.
 
The
 
initial
 
risk
 
for
 
a
 
risk
 
factor
 
is
 
herein
 
defined
 
as
 
the
 
risk
 
level
 
after
 
the
potential impact
 
of the
 
risk factor
 
is addressed
 
by competent
 
and prudent
 
management utilizing
control measures readily available.
 
Residual risk for a risk factor is herein defined as the risk
level following application
 
of special mitigation
 
measures if management
 
determines that the
initial
 
risk
 
level
 
is
 
unacceptable.
 
Initial
 
risk
 
and
 
residual
 
risk
 
can
 
be
 
quantified
 
numerically,
derived by the
 
product of values
 
assigned to probability
 
and consequence ranging
 
from very
low risk to very high risk.
 
The
 
probability
 
and
 
consequence
 
parameters
 
are
 
subjective
 
numerical
 
estimates
 
made
 
by
practiced mine engineers and managers.
 
Both are assigned values from 1 to 5 for
 
which the
value 1 represents the
 
lowest probability and least
 
consequence, and the value
 
5 represents
the highest probability and
 
greatest consequence.
 
The products, which define
 
the Risk Level,
are classified from very low to very high.
 
Risk Level Table
 
(R = P x C)
Risk Level (R)
Very Low (1 to 2)
Low (3 to 5)
Moderate (6 to 11)
High (12 to 19)
Very High (20 to 25)
Risk aspects
 
identified and
 
evaluated during
 
this assignment
 
total 13.
 
No residual
 
risks are
rated Very
 
High.
 
One (1)
 
residual risk
 
is rated
 
High.
 
Eight (8)
 
of the
 
risk aspects
 
could be
associated
 
with
 
Moderate
 
residual risk.
 
Four
 
(4) of
 
the
 
risk aspects
 
were
 
attributed
 
Low or
Very Low residual risks.
 
22.2.1
 
Governing Assumptions
The listing of
 
the aspects is
 
not presumed to
 
be exhaustive.
 
Instead that listing
 
is presented
based on the experiences of the contributors to the TRS.
 
1.
 
The probability and consequence ratings are subjectively assigned, and it is assumed
that this subjectivity reasonably reflects the condition of the active and projected mine
operations.
2.
 
The Control Measures shown in the matrices presented in this chapter are not
exhaustive.
 
They represent a condensed collection of activities that the author of the
risk assessment section has observed to be effective in coal mining scenarios.
 
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
66
3.
 
Mitigation Measures listed for each risk factor of the operation are not exhaustive.
 
The
measures listed, however, have been observed by the author to be effective.
 
4.
 
The monetary values used in ranking the consequences are generally-accepted
quantities for the coal mining industry.
22.2.2
 
Limitations
The
 
risk
 
assessment
 
proposed
 
in
 
this
 
report
 
is
 
subject
 
to
 
the
 
limitations
 
of
 
the
 
information
currently collected, tested, and interpreted at the time of the writing of the report.
22.2.3
 
Methodology
The numerical
 
quantities (i.e.,
 
risk levels)
 
attributable
 
to either
 
“initial” or
 
“residual” risks
 
are
derived by the
 
product of values
 
assigned to probability
 
and consequence ranging
 
from very
low risk to very high risk.
R = P x C
Where:
R = Risk Level
P = Probability of Occurrence
C = Consequence of Occurrence
The
 
Probability
 
(P)
 
and
 
Consequence
 
(C)
 
parameters
 
recited
 
in
 
the
 
formula
 
are
 
subjective
numerical
 
estimates
 
made
 
by
 
practiced
 
mine
 
engineers
 
and
 
managers.
 
Both
 
P
 
and
 
C
 
are
assigned
 
integer
 
values
 
ranging
 
from
 
1
 
to
 
5
 
for
 
which
 
the
 
value
 
1
 
represents
 
the
 
lowest
probability
 
and
 
least
 
consequence,
 
and
 
the
 
value
 
5
 
represents
 
the
 
highest
 
probability
 
and
greatest consequence.
 
The products (R =
 
P x C) which
 
define the Risk Level,
 
are thereafter
classified from very low to very high.
Risk Level Table
Risk Level (R)
Very Low (1 to 2)
Low (3 to 5)
Moderate (6 to 11)
High (12 to 19)
Very High (20 to 25)
Very
 
high initial risks
 
are considered to
 
be unacceptable and
 
require corrective action
 
well in
advance of
 
project development.
 
In short,
 
measures must
 
be applied
 
to reduce
 
very high
 
initial
risks to a tolerable level.
 
As
 
shown
 
and
 
discussed
 
above,
 
after
 
taking
 
into
 
account
 
the
 
operational,
 
technical,
 
and
administrative actions
 
that
 
have
 
been applied
 
or are
 
available for
 
action
 
when required,
 
the
residual risk can be determined.
 
The residual risk provides a basis for
 
the management team
to determine if the residual risk
 
level is acceptable or tolerable.
 
If the risk level is determined
to
 
be
 
unacceptable,
 
further
 
actions
 
should
 
be
 
considered
 
to
 
reduce
 
the
 
residual
 
risk
 
to
acceptable or
 
tolerable levels
 
to provide
 
justification for
 
continuation of
 
the proposed
 
operation.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
67
22.2.4
 
Development of the Risk Matrix
Risks
 
have
 
been
 
identified
 
for
 
the
 
technical,
 
operational,
 
and
 
administrative
 
subjects
addressed
 
in
 
the
 
TRS.
 
The
 
risk
 
matrix
 
and
 
risk
 
assessment
 
process
 
is
 
modelled
 
to
 
that
presented in the Australian
 
and New Zealand
 
Standard on Risk Management
 
(AS/NZS 4360).
 
22.2.4.1
 
Probability Level Table
Table 22-1:
 
Probability Level Table
Category
Probability Level (P)
1
Remote
Not likely to occur except in exceptional circumstances.
<10%
2
Unlikely
Not likely to occur; small in degree.
10 - 30%
3
Possible
Capable of occurring.
30 - 60%
4
Likely
High chance of occurring in most circumstances.
60 - 90%
5
Almost Certain
Event is expected under most circumstances; impossible
 
to
avoid.
>90%
The lowest rated
 
probability of occurrence
 
is assigned
 
the value of
 
1 and described
 
as remote,
with a likelihood of occurrence
 
of less than 2
 
percent.
 
Increasing values are assigned to
 
each
higher
 
probability
 
of
 
occurrence,
 
culminating
 
with
 
the
 
value
 
of
 
5
 
assigned
 
to
 
incidents
considered to be almost certain to occur.
22.2.4.2
 
Consequence Level Table
Table
 
22-2
 
lists the consequence levels.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
68
Table 22-2:
 
Consequence Level Table
Correlation of Events in Key Elements of the
 
Project Program to Event Severity Category
Category
Severity of
the Event
Financial
Impact of the
Event
Unplanned
Loss of
Production
(Impact on
Commercial
Operations)
Events Impacting
on the
Environment
Events Affecting the
Program's Social and
Community Relations
Resultant Regulatory /
Sovereign Risk
Events Affecting Occupational Health &
Safety
1
Insignificant
< USD $0.5
million
≤ 12 hours
Insignificant loss of
habitat; no
irreversible effects
on water, soil and
the environment.
Occasional nuisance impact on
travel.
-
 
Event recurrence avoided by corrective
action through established procedures
(Engineering, guarding, training).
2
Minor
USD $0.5 million
to $2.0 million
≤ 1 day
No significant
change to species
populations; short-
term reversible
perturbation to
ecosystem function.
Persistent nuisance impact on
travel.
 
Transient adverse media
coverage.
-
 
First aid – lost time.
 
Event recurrence
avoided by corrective action through
established procedures.
3
Moderate
USD $2.0 million
to $10.0 million
≤ 1 week
Appreciable change
to species
population; medium-
term (≤10 years)
detriment to
ecosystem function.
Measurable impact on travel and
water/air quality.
 
Significant
adverse media coverage /
transient public outrage.
Uncertainty securing or
retaining essential
approval / license.
Medical Treatment –
permanent
incapacitation.
 
Avoiding event recurrence
requires modification to established
corrective action procedures
.
Change to regulations
(tax; bonds; standards).
4
Major
USD $10.0
million to $50.0
million
1 to 2 weeks
Change to species
population
threatening viability;
long-term (>10
years) detriment to
ecosystem function.
Long-term, serious impact on
travel and use of water
resources; degradation of air
quality; sustained and effective
public opposition.
Suspension / long-delay
in securing essential
approval / license.
Fatality.
 
Avoiding event recurrence
requires modification to established
corrective action procedures and staff
retraining.
Change to laws (tax;
bonds; standards).
5
Critical
>USD $50.0
million
>1 month
Species extinction;
irreversible damage
to ecosystem
function.
Loss of social license.
Withdraw / failure to
secure essential
approval / license.
Multiple fatalities.
 
Avoiding event
recurrence requires major overhaul of
policies and procedures.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
69
The
 
lowest
 
rated
 
consequence
 
is
 
assigned
 
the
 
value
 
of
 
1
 
and
 
is
 
described
 
as
 
Insignificant
Consequence parameters of which include
 
non-reportable safety incidents with zero
 
days lost
accidents, no
 
environmental damage,
 
loss of
 
production or
 
systems for
 
less than
 
one week
and
 
cost
 
of
 
less
 
than
 
USD
 
$0.5
 
million.
 
Increasing
 
values
 
are
 
assigned
 
to
 
each
 
higher
consequence,
 
culminating
 
with
 
the
 
value
 
of
 
5
 
assigned
 
to
 
critical
 
consequences,
 
the
parameters of
 
which include
 
multiple-fatality accidents,
 
major environmental
 
damage, and
 
loss
of production
 
or systems
 
for longer
 
than one
 
month and
 
cost of
 
greater than
 
USD $50.0
 
million.
Composite Risk Matrix R = P x C and Color-Code Convention
The risk level, defined
 
as the product of
 
probability of occurrence and
 
consequence, ranges in
value from 1 (lowest possible risk) to 25 (maximum risk level).
 
The values are color-coded to
facilitate identification of the highest risk aspects.
Table 22-3:
 
Risk Matrix
P x C = R
Consequence (C)
Insignificant
Minor
Moderate
Major
Critical
1
2
3
4
5
Probability Level (P)
Remote
1
1
2
3
4
5
Unlikely
2
2
4
6
8
10
Possible
3
3
6
9
12
15
Likely
4
4
8
12
16
20
Almost
Certain
5
5
10
15
20
25
22.2.5
 
Categorization of Risk Levels and Color Code Convention
Very
 
high
 
risks
 
are
 
considered
 
to
 
be
 
unacceptable
 
and
 
require
 
corrective
 
action.
 
Risk
reduction measures must be applied to reduce very high risks to a tolerable level.
22.2.6
 
Description of the Coal Property
The Logan Mine Complex (
Logan
) is located in Logan, Boone, and Wyoming
 
Counties, West
Virginia
 
–is an
 
active operation
 
with four
 
underground mines
 
and one
 
surface mine.
 
Active
underground
 
operations
 
within
 
the
 
Logan
 
Mine
 
Complex
 
all
 
utilize
 
continuous
 
mining
production sections.
 
Large mining operations are conducted at the Muddy Bridge, Eagle No.
1
 
Mine
 
and
 
Lower
 
War
 
Eagle
 
Mine.
 
Coronado
 
also
 
operates
 
a
 
single
 
section
 
active
underground room-and-pillar
 
section
 
in the
 
Powellton
 
Mine.
 
Other operations
 
are projected
on relatively small reserve blocks to
 
be developed sequentially to sustain production levels
 
as
each reserve is
 
depleted.
 
The method provides
 
continuity, preserving skilled work groups
 
and
enabling
 
effective
 
utilization
 
of
 
production
 
equipment
.
 
Mines
 
located
 
above
 
drainage
 
have
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
70
access via
 
drift entries.
 
A few
 
of the
 
coal seams
 
are below
 
drainage and
 
are accessed
 
with
slopes and shafts or box cuts.
The Logan
 
Mine Complex
 
also includes
 
one active
 
surface mine
 
(Toney
 
Fork) and
 
one idle
surface mine (Elklick).
 
Both area and contour surface mining are employed.
 
Highwall mining
is conducted
 
by contract
 
operators.
 
The surface
 
operations are
 
relatively small
 
and developed
sequentially to sustain
 
production levels.
 
Similar to the
 
underground operations, the method
provides
 
continuity
 
while
 
preserving
 
skilled
 
work
 
groups
 
and
 
enabling
 
effective
 
utilization of
production equipment.
 
The surface mining
 
methods selected utilize
 
hydraulic shovels, front-
end loaders, large tractors and rock trucks for overburden removal.
22.2.7
 
Summary of Residual Risk Ratings
Each
 
risk
 
factor
 
is
 
numbered,
 
and
 
a
 
risk
 
level
 
for
 
each
 
is
 
determined
 
by
 
multiplying
 
the
assigned probability by
 
the assigned consequence.
 
The risk
 
levels are plotted
 
on a risk
 
matrix
to provide a composite view of the Coronado risk profile.
 
The average risk level is 7.5, which
is defined as Moderate.
Table 22-4:
 
Risk Assessment Matrix
 
 
 
 
 
 
 
 
 
Consequence
Critical
>$50 MM
8, 9
 
 
 
 
 
Major
$10-50MM
 
 
 
6
 
 
Moderate
$2-10 MM
12
4
1, 2, 3
 
 
 
Minor
$0.5-$2 MM
 
 
13
5, 10
7
 
Low
<$0.5 MM
 
 
11
 
 
 
 
<10%
10-30%
30-60%
60-90%
>90%
 
Remote
Unlikely
Possible
Likely
Almost
Certain
22.2.8
 
Risk Factors
A high-level approach is utilized to characterize risk factors
 
that are generally similar across a
number of
 
the active
 
and proposed
 
mining operations.
 
Risk factors
 
that are
 
unique to
 
a specific
operation or are particularly noteworthy are addressed individually.
22.2.8.1
 
Geological and Coal Resource
Coal
 
mining
 
is
 
accompanied
 
by
 
risk
 
that,
 
despite
 
exploration
 
efforts,
 
mining
 
areas
 
will
 
be
encountered where geological conditions render extraction
 
of the resource to be
 
uneconomic,
or that coal quality characteristics disqualify the product for sale into target markets.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
71
Offsetting the geological and
 
coal resource risk
 
are the massive
 
size of the
 
controlled property
which
 
allows
 
large
 
areas
 
to
 
be
 
mined
 
sufficiently
 
away
 
from
 
areas
 
where
 
coal
 
quality
 
and
mineability
 
may
 
be
 
less
 
favorable.
 
In
 
addition,
 
several
 
mines
 
are
 
designed
 
to
 
operate
 
with
multiple
 
production
 
sections,
 
which
 
lessens
 
the
 
immediate
 
impact
 
when
 
one
 
section
encounters
 
difficulties.
 
The
 
large
 
reserve
 
areas
 
also
 
provide
 
a
 
mitigation
 
strategy
 
of
developing
 
an
 
additional
 
(spare)
 
section
 
at
 
each
 
mine,
 
or
 
additional
 
mines,
 
which
 
can
 
be
activated
 
when
 
adverse
 
conditions
 
are
 
encountered,
 
thereby
 
maintaining
 
consistent
production and quality.
 
The spare section or
 
mines require additional mine
 
extension cost but
increase flexibility and performance consistency.
The
 
larger reserve
 
areas will
 
be developed
 
with
 
multiple production
 
sections and
 
the small,
replacement
 
production
 
reserve
 
areas
 
provide
 
ready
 
access
 
to
 
alternative
 
locations
 
if
geological
 
and
 
coal
 
resource
 
characteristics
 
require
 
abandonment
 
of
 
an
 
active
 
production
area.
Table 22-5:
 
Geological and Coal Resource Risk Assessment (Risks 1 and 2)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Recoverable coal
tonnes recognized to
be significantly less
than previously
estimated.
Reserve base is
adequate to serve market
commitments and
respond to opportunities
for many years.
 
Local
adverse conditions may
increase frequency and
cost of production unit
relocations.
Previous and ongoing
exploration and
extensive regional
mining history provide
a high level of
confidence of coal
seam correlation,
continuity of the coal
seams, and coal
resource tonnes.
4
4
16
Optimize mine
plan to increase
resource
recovery;
develop mine
plan to provide
readily available
alternate mining
locations to
sustain expected
production level.
3
3
9
Coal quality locally
proves to be lower
than initially
projected.
If uncontrolled, production
and sale of coal that is
out of specification can
result in rejection of
deliveries, cancellation of
coal sales agreements
and damage to
reputation.
Exploration and vast
experience and history
in local coal seams
provide confidence in
coal quality; limited
excursions can be
managed with careful
product segregation
and blending.
3
5
15
Develop mine
plan to provide
readily available
alternate mining
locations to
sustain expected
production level;
modify coal sales
agreements to
reflect coal
quality.
3
3
9
22.2.8.2
 
Environmental
MM&A
 
completed
 
a
 
Limited
 
Phase
 
I
 
Environmental
 
Site
 
Assessment
 
(
ESA
)
 
on
 
the
 
Logan
County
 
Property
 
in
 
May
 
2017
 
on
 
behalf
 
of
 
Coronado.
 
MM&A
 
concluded
 
that
 
no
 
long-term
liabilities existed at the time of this ESA.
Water
 
quality
 
and
 
other
 
permit
 
requirements
 
are
 
subject
 
to
 
modification
 
and
 
such
 
changes
could have
 
a material impact
 
on the capability
 
of the operator
 
to meet modified
 
standards or
to
 
receive new
 
permits
 
and
 
modifications
 
to
 
existing permits
 
.
 
Permit protests
 
may
 
result
 
in
delays or denials to permit applications.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
72
Environmental standards and permit requirements have evolved significantly
 
over the past 50
years
 
and
 
to-date,
 
mining
 
operators
 
and
 
regulatory
 
bodies
 
have
 
been
 
able
 
to
 
adapt
successfully to evolving environmental requirements.
Table 22-6:
 
Environmental (Risks 3 and 4)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Environmental
performance
standards are
modified in the future.
Delays in receiving new
permits and modifications
to existing permits; cost
of testing and treatment
of water and soils
Work with regulatory
agencies to
understand and
influence final
standards; implement
testing, treatment and
other actions to comply
with new standards.
3
4
12
Modify mining
and reclamation
plans to improve
compliance with
new standards
while reducing
cost of
compliance.
3
3
9
New permits and
permit modifications
are increasingly
delayed or denied.
Interruption of production
and delayed
implementation of
replacement production
from new mines.
Comply quickly with
testing, treatment and
other actions required;
continue excellent
compliance
performance within
existing permits.
2
4
8
Establish and
maintain close
and constructive
working
relationships with
regulatory
agencies, local
communities and
community
action groups.
2
3
6
22.2.8.3
 
Regulatory Requirements
Federal and
 
state health
 
and safety
 
regulatory agencies
 
occasionally amend
 
mine laws
 
and
regulations.
 
The
 
impact
 
is
 
industry-wide.
 
Mining
 
operators
 
and
 
regulatory
 
agencies
 
have
been able to adapt successfully to evolving health and safety requirements.
Table 22-7:
 
Regulatory Requirements (Risk 5)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Federal and state
mine safety and
health regulatory
agencies amend
mine laws and
regulations.
Cost of training,
materials, supplies and
equipment; modification
of mine examination and
production procedures;
modification of mining
plans.
Participate in hearings
and workshops when
possible to facilitate
understanding and
implementation; work
cooperatively with
agencies and
employees to facilitate
implementation of new
laws and regulations.
4
3
12
Familiarity and
experience with
new laws and
regulations
results in
reduced impact
to operations and
productivity and
improved
supplies and
equipment
options.
4
2
8
22.2.8.4
 
Market and Transportation
Most
 
of
 
the
 
current
 
and
 
future
 
production
 
is
 
expected
 
to
 
be
 
directed
 
to
 
domestic
 
and
international metallurgical markets.
 
Historically the metallurgical
 
markets have been
 
cyclical
and highly volatile.
 
Thermal coal markets are
 
also cyclical and domestic
 
markets have been
adversely affected by competition from natural
 
gas and subsidized renewable energy
 
sources
and regulation.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
73
Table 22-8:
 
Market and Transportation (Risk 6)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Volatile coal prices
drop precipitously.
Loss of revenue
adversely affects
profitability; reduced cash
flow may disrupt capital
expenditures plan.
Cost control measures
implemented; capital
spending deferred.
4
5
20
High-cost
operations
closed, and
employees
temporarily
furloughed.
4
4
16
Occasional
 
delay
 
or
 
interruption
 
of
 
rail,
 
river
 
and
 
terminals
 
service
 
may
 
be
 
expected
.
 
The
operator can possibly minimize
 
the impact of delays
 
by being a preferred
 
customer by fulfilling
shipment obligations promptly and maintaining close working relationships.
Table
 
22-9:
 
Market and Transportation (Risk 7)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Rail or river transport
is delayed; storage
and shipping access
at river and ocean
terminals is not
available.
Fulfillment of coal sales
agreements delayed;
limited coal storage at
mines may increase cost
of rehandling; production
may be temporarily idled.
Provide adequate
storage capacity at
mines; coordinate
continuously with
railroad and shipping
companies to respond
quickly and effectively
to changing
circumstances.
5
3
15
Provide back-up
storage facility
along with
personnel,
equipment and
rehandle plan to
sustain
production and
fulfill sales
obligations
timely.
5
2
10
22.2.8.5
 
Mining Plan
Occupational
 
health
 
and
 
safety
 
risks
 
are
 
inherent
 
in
 
mining
 
operations.
 
Comprehensive
training
 
and
 
retraining
 
programs,
 
internal
 
safety
 
audits
 
and
 
examinations,
 
regular
 
mine
inspections,
 
safety
 
meetings,
 
along
 
with
 
support
 
of
 
trained
 
fire
 
brigades
 
and
 
mine
 
rescue
teams
 
are
 
among
 
activities
 
that
 
greatly
 
reduce
 
accident
 
risks.
 
Employee
 
health
 
monitoring
programs
 
coupled
 
with
 
dust
 
and
 
noise
 
monitoring
 
and
 
abatement
 
reduce
 
health
 
risks
 
to
miners.
 
As underground
 
and surface
 
mines are
 
developed and
 
extended, observation
 
of geological,
hydrogeological
 
and
 
geotechnical
 
conditions
 
lead
 
to
 
modification
 
of
 
mine
 
plans
 
and
procedures to enable safe work within the mine environments.
Highlighted below are selected examples
 
of safety and external factors relevant
 
to Coronado
operations.
22.2.8.5.1 Methane Management
Coalbed
 
methane
 
is
 
present
 
in
 
coal
 
operations
 
below
 
drainage.
 
Often
 
the
 
methane
concentration in shallow coal seams
 
is at such low levels that
 
it can be readily managed
 
with
frequent
 
testing
 
and
 
monitoring,
 
vigilance
 
and
 
routine
 
mine
 
ventilation.
 
Very
 
high
 
methane
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
74
concentrations may be present at
 
greater depths.
 
High methane concentrations may require
degasification of the coal
 
seam to assure safe mining.
 
Due to the seams being
 
targeted and
their depths, excessive methane is not expected to be encountered at Logan.
Table 22-10:
 
Methane Management (Risk 8)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Methane hazard is
present in mines
operating below
drainage.
Injury or loss of life;
possible ignition of gas
and mine explosion;
potential loss of mine and
equipment temporarily or
permanently; additional
mine fan, mine power,
ventilation, monitoring
and examination
requirements.
Low to moderate levels
can be managed with
frequent examinations,
testing and monitoring
within the mine
ventilation system.
 
Excellent rock dust
maintenance
minimizes explosion
propagation risk should
an ignition occur.
1
5
5
Very high-level
methane
concentrations
may require coal
seam
degasification
and gob
degasification if
longwall or pillar
extraction
methods are
employed.
1
5
5
22.2.8.5.2 Mine Fires
Mine fires,
 
once common
 
at mine
 
operations, are
 
rare today.
 
Most active
 
coal miners
 
have
not encountered a mine fire.
 
Vastly
 
improved mine power and equipment electrical
 
systems,
along with safe mine
 
practices reduce mine fire
 
risks.
 
Crew training and
 
fire brigade support
and
 
training
 
improve
 
response
 
for
 
containment
 
and
 
control
 
if
 
a
 
fire
 
occurs.
 
Spontaneous
combustion
 
within
 
coal
 
mines,
 
which
 
is
 
the
 
source
 
of
 
most
 
fires
 
that
 
occur
 
today,
 
is
 
not
expected
 
to
 
commonly
 
occur
 
at
 
the
 
Logan
 
property.
 
When
 
spontaneous
 
combustion
conditions are
 
present, monitoring systems
 
are employed for
 
early detection and
 
mine plans
are designed to facilitate isolation, containment and rapid extinguishment.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
75
Table 22-11
 
:
 
Mine Fires (Risk 9)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Mine fire at
underground or
surface mine
operation.
Injury or loss of life;
potential loss of mine
temporarily or
permanently; damage to
equipment and mine
infrastructure.
Inspection and
maintenance of mine
power, equipment and
mine infrastructure;
good housekeeping;
frequent examination
of conveyor belt
entries; prompt
removal of
accumulations of
combustible materials.
1
5
5
If spontaneous
combustion
conditions are
present,
enhanced
monitoring and
examination
procedures will
be implemented;
mine design will
incorporate
features to
facilitate
isolation,
containment and
extinguishment
of
 
spontaneous
combustion
locations.
1
5
5
22.2.8.5.3 Highwall Failure
Contour
 
surface
 
mining,
 
area
 
surface
 
mining
 
and
 
highwall
 
mining
 
all
 
expose
 
miners
 
and
production
 
equipment
 
to
 
the
 
risk
 
of
 
highwall
 
failure.
 
The
 
highwall
 
can
 
be
 
designed
 
to
incorporate safety
 
precautions to
 
address geotechnical
 
and hydrogeological
 
concerns.
 
Drilling
and
 
blasting
 
design
 
can
 
be
 
modified
 
to
 
fit
 
soil
 
and
 
strata
 
conditions
 
to
 
enhance
 
highwall
stability.
 
Foremen
 
and
 
crews
 
are
 
trained
 
to
 
examine
 
the
 
highwalls
 
frequently
 
to
 
observe
changes and indications of
 
failure.
 
Highwall designs incorporate adequate
 
web thickness and
safety pillar width to assure highwall stability.
Table 22-12:
 
Highwall Failure (Risk 10)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Highwall failure
occurs at surface or
highwall mining
operations.
Injury or loss of life;
catastrophic damage to
equipment; production
interruption.
Regular inspection for
change and signs of
failure; conservative
design of HWM web
thickness and safety
pillar width;
conservative wall slope
and bench width in
design.
4
3
12
Optimize drilling
and blasting
plan; increase
safety factors for
wall slope and
bench width;
install
instrumentation
and frequent
survey to detect
movement;
dewater to
reduce wall
pressure.
4
2
8
22.2.8.5.4 Availability of Supplies and Equipment
The industry has
 
periodically experienced difficulty
 
receiving timely delivery
 
of mine supplies
and equipment.
 
Availability issues
 
often accompanied
 
boom periods
 
for coal
 
demand.
 
Any
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
76
future
 
delivery
 
of
 
supplies and
 
equipment delays
 
are
 
expected
 
to be
 
temporary
 
with
 
limited
impact on production.
Table 22-13:
 
Availability of Supplies and Equipment (Risk 11)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Disruption of
availability for
supplies and
equipment.
Temporary interruption of
production.
Force majeure
provision in coal sales
agreements to limit
liability for delayed or
lost sales.
3
2
6
Work closely with
customers to
assure delayed
coal delivery
rather than
cancelled sales;
monitor external
conditions and
increase
inventory of
critical supplies;
accelerate
delivery of
equipment when
possible.
3
1
3
22.2.8.5.5 Labor
Work stoppage due
 
to labor
 
protests are
 
considered to
 
be unlikely
 
and accompanied
 
by limited
impact should it
 
occur.
 
Excellent employee relations and
 
communications limit the exposure
to outside
 
protesters.
 
Loss of
 
supervisors and
 
skilled employees
 
to retirement
 
is inevitable;
the impact can
 
be lessened
 
with succession
 
planning and
 
training and
 
training and
 
mentorship
of new employees.
Table 22-14:
 
Labor – Work Stoppage (Risk 12)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Work stoppage due
to strikes, slowdowns
or secondary boycott
activity.
Loss of production and
coal sales; damaged
customer and employee
relations; reputation loss.
Maintain excellent
employee relations and
communications;
maintain frequent
customer
communications.
2
3
6
Develop plan for
employee
communications
and legal support
to minimize
impact of
secondary
boycott activities.
1
3
3
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
77
Table 22-15:
 
Labor – Retirement (Risk 13)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation Measures
Residual Risk
Level
P
C
R
P
C
R
Retirement of
supervisors and
skilled employees.
Loss of leadership
and critical skills to
sustain high levels of
safety, maintenance
and productivity.
Monitor demographics
closely and maintain
communications with
employees who are
approaching retirement
age; maintain employee
selection and training
programs.
3
3
9
Maintain selection of
candidates and
implementation of in-
house or third-party
training for electricians
and mechanics;
develop employee
mentoring program.
3
2
6
23
Recommendations
Coronado
 
is
 
continuing
 
to
 
work
 
both
 
internally
 
and
 
with
 
outside
 
assistance
 
to
 
continue
 
to
further define their Resource Base and to Optimize the LOM Plan.
24
References
Publicly
 
available
 
information
 
from
 
various
 
State
 
and
 
Federal
 
agencies
 
was
 
used
 
where
relevant.
25
Reliance on Information Provided by the
Registrant
For the purpose of this TRS, MM&A utilized the
 
Geological data provided by Coronado.
 
This
information was subjected to verification of its integrity and completeness.
Historical productivity and operating costs were also
 
supplied by Coronado.
 
This information
was combined with the experience and knowledge of the QP’s to forecast the LOM plan.
A summary
 
of the
 
information provided by
 
Coronado relied upon
 
by MM&A for
 
the purposes
of this TRS is provided in
Table
 
25-1
.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation
 
S-K 1300 as
of December 31, 2021
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
78
Table 25-1:
 
Information from Registrant Relied Upon by MM&A
 
Category
Information Provided by Coronado
Report
Section
Legal
Mineral control and surface control rights as shown on maps
3.2, 3.3
Geological
Geologic data including digital databases and original source
 
data
including geologist logs, driller’s logs, geophysical logs
9.1
Coal Quality
Database of coal quality information supplemented with
 
original source
laboratory sheets where available
10.1
Mining
Historical productivities and manpower from operating and future
Coronado mines
13.2, 13.4
Coal Preparation
Flow sheet and other information representing current
 
and future methods
of coal processing
 
14.1
Marketing
Long-term price forecast and market placement by seam
 
or mine used in
financial projections
16.2
Waste Disposal
Engineering data and estimates representing remaining
 
capacities for
coarse and fine coal waste disposal
17.2
Environmental
Permit and bonding information
17.3
Costs
Historical and budgetary operating cost information used to
 
derive cost
drivers for reserve financial modeling
18.2
Economic
WACC and inflation rate used in discounted
 
cash flow analysis
19.1, 19.2,
19.3
ex963p88i0.jpg
 
 
APPENDIX
A
BIOGRAPHIES
ex963p89i0.jpg
 
 
 
ex963p90i0.jpg
 
 
ex963p91i0.jpg
 
 
APPENDIX
B
MAPS
ex963p92i0.jpg
 
 
 
ex963p93i0.jpg
 
 
 
ex963p94i0.jpg
 
 
 
ex963p95i0.jpg
 
 
 
ex963p96i0.jpg
 
 
 
ex963p97i0.jpg
 
 
 
ex963p98i0.jpg
 
 
 
ex963p99i0.jpg
 
 
 
ex963p100i0.jpg
 
 
 
ex963p101i0.jpg
 
 
 
ex963p102i0.jpg
 
 
 
ex963p103i0.jpg
 
 
 
ex963p104i0.jpg
 
 
 
ex963p105i0.jpg
 
 
 
ex963p106i0.jpg
 
 
ex963p107i0.jpg
 
 
 
ex963p108i0.jpg
 
 
 
ex963p109i0.jpg
 
 
ex963p110i0.jpg
 
 
APPENDIX
C
GLOSSARY OF TERMS
 
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
 
 
 
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Glossary of Abbreviations and Definitions
Abbreviation
Definition
AIPG
American Institute of Professional Geologists
ARMPS
Analysis of Retreat Mining Pillar Stability
ASTM
American Society for Testing
 
and Materials
AVS
Applicant Violator System
bcm
Bank cubic meters
Btu/lb.
British Thermal Unit per pound
CAT
®
Caterpillar Inc.
C.P.G.
Certified Professional Geologist
Carlson
Carlson Mining – formerly SurvCADD
®
 
– a prevalent software package
used for modeling in the Appalachian region
CFR
Code of Federal Regulations
Coronado
Coronado Global Resources Inc.
 
CSR
Codes of State Rules
 
CSX
CSX Corporation, a rail-based freight transportation company
CTR
Contour mining
Demonstrated
reserves
Demonstrated reserves are the sum of proven and probable reserves.
DEP
Department of Environmental Protection
EBITDA
Earnings before Interest, Taxes,
 
Depreciation, and Amortization
 
EOM
End-of-mine reclamation
EPA
United States Environmental Protection Agency
 
ESA
Limited Phase I Environmental Site Assessment
EVR
Estimated Visual Recovery
Feasibility Study
“…comprehensive technical and economic study of the selected
development option for a mineral project, which includes detailed
assessments of all applicable modifying factors together with any other
relevant operational factors, and detailed financial analysis that are
necessary to demonstrate, at the time of reporting, that extraction is
economically viable.
 
According to the proposed definition, the results of
the study may serve as the basis for a final decision by a proponent or
financial institution to proceed with, or finance, the development of the
project. Thus, a feasibility study is more comprehensive, with a higher
degree of accuracy, and yielding results with a higher level of
confidence, than a pre-feasibility study.”
 
Hitachi
Hitachi Construction Machinery Co., Ltd.
HWM
Highwall mining
In situ
Its natural position; said specific of a rock, soil, or fossil when in the
situation in which was originally formed or deposited
Indicated
Resources
Indicated
 
resources
 
are
 
those
 
lying
 
between
 
0.4-kilometer
 
and
 
1.2-
kilometer radius
 
from such
 
an observation
 
point and
 
reported herein
 
as
in-situ mineral resources.
Inferred
Resources
Inferred resources lie more than a 1.2-kilometer radius from a valid point
of
 
measurement
 
but
 
less
 
than
 
4.8
 
kilometers
 
from
 
one,
 
and
 
reported
herein as in-situ mineral resources.
JORC Code
Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves
lb. SO
2
 
/ mm Btu
Pounds per sulfur dioxide per million British thermal units
LJ Hughes
LJ Hughes & Sons, Inc. - drilling Company
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
 
 
 
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
Abbreviation
Definition
LOM
Life-of-mine
M&R
Maintenance and repair
M.B.A.
Master of Business Administration
Measured
Resources
Measured resources are those lying within 0.4-kilometer radius from a
valid point of measurement and reported herein as in-situ mineral
resources.
MINER Act
Mine Improvement and New Emergency Response Act of 2006
 
Mineral Reserve
“…the economically mineable part of a Measured and/or Indicated
Mineral Resource.
 
It includes dilution materials and allowances for
losses, which occur when the material is mined or extracted and is
defined by studies at Preliminary Feasibility or Feasibility level as
appropriate that include Modifying Factors.
 
Such studies demonstrate
that, at the time of reporting, extraction of the mineral reserve is
economically viable under reasonable investment and marketing
assumptions.”
 
Mineral Resource
“…a concentration or occurrence of solid material of economic interest
or on the Earth’s crust in such form, grade or quality that there are
reasonable prospects for eventual economic extraction.
 
The location,
quantity, grade, continuity and other geological characteristics and
continuity of a Mineral Resource are known, estimated or interpreted
from specific geological evidence and knowledge, including sampling.”
 
MM&A
Marshall Miller & Associates, Inc.
Modifying Factors
“…considerations used to convert Mineral Resources to Mineral
Reserves. These include, but are not restricted to, mining, processing,
metallurgical, infrastructure, economic, marketing, legal, environmental
compliance, plans, negotiations, or agreements with local individuals or
groups and governmental factors.”
MRMR
Mineral Resources to Mineral Reserves
MSHA
United States Department of Labor Mine Safety and Health
Administration
MSL
Mean sea level
Mt
Million metric tonnes
NAIP
National Agricultural Imagery Program
NIOSH
National Institute for Occupational Safety and Health
NS
Norfolk Southern Corporation, a rail-based freight transportation
company
O&M
Operating and maintenance
 
OSD
Out-of-seam dilution
OSM
U.S. Office of Surface Mining Reclamation and Enforcement
P&L
Profit and loss before tax
 
P.E.
Professional Engineer
Preliminary
Feasibility Study
“…as a comprehensive study of a range of options for the technical and
economic viability of a mineral project that has advanced to a stage
where a qualified person has determined (in the case of underground
mining) a preferred mining method, or in the case of surface mining) a
pit configuration, and in all cases has determined an effective method of
mineral processing and an effective plan to sell the product. The study’s
financial analysis must have the level of detail necessary to
demonstrate, at the time of reporting, that extraction is economically
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
 
 
 
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Abbreviation
Definition
viable. In addition, as noted in the proposed definition of a pre-feasibility
study,
 
while a pre-feasibility study is less comprehensive and results in
a lower confidence level than a feasibility study, a pre- feasibility study
is more comprehensive and results in a higher confidence level than an
initial assessment.”
 
Property(ies)
Bituminous coal deposits located in Boone, Logan, and Wyoming
Counties, West Virginia.
 
QP
Qualified Person
Qualified Person
“…a person who is a mineral industry professional with at least five
years of relevant experience in the type of mineralization and type of
deposit under consideration and in the specific type of activity that
person is undertaking on behalf of the registrant. In addition, the
proposed definition requires a qualified person to be an eligible member
or licensee in good standing of a recognized professional organization
at the
time the technical report is prepared.”
Rec.
Recovery
RECs
Recognized Environmental Conditions
Resource
Database
The Resource Database is established by the collection, validation,
recording, storing and processing of data and forms the foundation
necessary for the estimation of Mineral Resource and Mineral Reserve.
 
A quality assurance and quality control program is essential and must
be established to govern the collection of all data.
 
In reporting, a
Mineral Resource must meet the minimum requirement of “reasonable
prospects for economic extraction”. This will require the concurrent
collection and storage of preliminary economic, mining, metallurgical,
environmental, legal and social data and other information for use in the
estimation of MRMR.
 
The Resource Database will include both “primary” (observation and
measurement) and “interpreted” data. It is recommended that data be
stored digitally, using a documented, standard format and a reliable
storage medium that allows for easy and complete retrieval of the data.
ROM
Run-of-mine
RPO
Recognized Professional Organizations
S-K 1300
United States Securities and Exchange Commission Regulation S-K
1300 Modernization of Property Disclosures
SEC
U.S. Securities and Exchange Commission
SMCRA
Surface Mining Control and Reclamation Act of 1977 is the primary
federal law that regulates the environmental effects of coal mining in the
United States.
SME
Society for Mining Engineers
Strip Ratio
Represented by bcm of overburden to recoverable coal tonnes
 
tph
tonnes per hour
 
TRS
Technical
 
Report Summary
USA
United States of America
USGS
United States Geologic Survey
 
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
Appendix C
 
 
 
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Abbreviation
Definition
VALMIN Code
Australasian Code for Public Reporting of Technical
 
Assessments and
Valuations of Mineral Assets
Vulcan™
Vulcan™ software is a product of Maptek™, a provider of software for
the global mining industry.
ex963p115i0.jpg
 
 
APPENDIX
D
INITIAL ECONOMIC ASSESSMENT FOR
RESOURCES EXCLUSIVE OF RESERVES
ex963p116i0.jpg
 
 
 
ex963p117i0.jpg
 
 
ex963p118i0.jpg
 
 
ex963p119i0.jpg
 
 
APPENDIX
E
JORC TABLE 1
 
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
>
Nature and quality of sampling (e.g. cut channels, random
 
chips, or specific
specialised industry standard measurement tools appropriate
 
to the minerals
under investigation, such as downhole gamma
 
sondes, or handheld XRF
instruments, etc.). These examples should not be
 
taken as limiting the broad
meaning of sampling.
>
Include reference to measures taken to ensure sample
 
representivity and the
appropriate calibration of any measurement tools
 
or systems used.
>
Aspects of the determination of mineralisation that are Material
 
to the Public
Report. In cases where ‘industry standard’ work has
 
been done this would be
relatively simple (e.g. ‘reverse circulation drilling
 
was used to obtain 1 m
samples from which 3 kg was pulverised to produce a
 
30 g charge for fire
assay’). In other cases, more explanation may be
 
required, such as where
there is coarse gold that has inherent sampling
 
problems. Unusual
commodities or mineralisation types (e.g. submarine nodules)
 
may warrant
disclosure of detailed information.
>
 
Most of the coal samples have been obtained
 
from the Properties by subsurface
exploration using core drilling techniques.
 
The protocol for preparing and testing
the samples has varied over time and is not well
 
documented for the older holes
drilled on the Properties.
>
 
Typical USA core drilling sampling technique is for the coal core sample,
 
once
recovered from the core barrel, to be described then wrapped
 
in a sealed plastic
sleeve and placed into a covered core box, which
 
is the length of the sample so
that the core can be delivered to a laboratory in relatively
 
intact condition and with
original moisture content.
>
 
It is reasonable to assume, given the sophistication
 
level of the previous operators,
that these samples were generally collected and processed
 
under industry best-
practices.
 
This assumption is based on MM&A’s familiarity with the operating
companies and the companies used to perform the
 
analysis.
 
>
 
Some of the drill holes were air rotary bored
 
and no coal core samples were
collected.
 
Seam thickness for rotary-drilled bore holes is
 
verified by calibrated
downhole gamma-density logs.
 
>
 
Coal samples that were deemed by MM&A geologists
 
to be unrepresentative were
not used for statistical analysis of coal quality, as documented in the
 
tabulations. A
representative group of drill hole samples from
 
the Properties were then checked
against the original drill laboratory reports to
 
verify accuracy
 
and correctness.
 
Drilling
techniques
>
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
 
blast,
auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit
 
or other type, whether core is
oriented and if so, by what method, etc.).
>
 
The Properties have been extensively explored
 
by subsurface drilling efforts carried
out by numerous entities, most of which were
 
completed prior to acquisition by
Coronado.
 
The majority of the drilling was accomplished using
 
vertical continuous
(diamond) coring or air rotary methods.
>
 
Core drilling methods utilize NX-size (5.4 centimeter)
 
or similar-sized core cylinders
to recover core samples, which can be used
 
to delineate geologic characteristics,
and for coal quality testing and geotechnical logging.
 
>
 
Data for the rotary drilled holes is mainly derived
 
from downhole geophysical logs,
which are used to interpret coal and rock thickness
 
and depth since logging of the
drill cuttings is not reliable.
>
 
Geophysical logging was performed on many of
 
the holes, either by Geological
Logging Systems (a division of MM&A), other
 
geophysical logging contractors, and
on those properties acquired from CONSOL geophysical
 
logging was often
performed by CONSOL’s in-house logging services.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Criteria
JORC Code explanation
Commentary
Drill sample
recovery
>
 
Method of recording and assessing core and chip
 
sample recoveries and
results assessed.
>
 
Measures taken to maximise sample recovery and
 
ensure representative
nature of the samples.
>
 
Whether a relationship exists between sample recovery
 
and grade and
whether sample bias may have occurred due
 
to preferential loss/gain of
fine/coarse material.
>
 
Where available, core recovery thickness of coal samples
 
was reconciled with the
thickness interpreted from geophysical logs.
>
 
Core recovery of the older coal samples lacking
 
geophysical logs is sometimes not
well-documented: however, when the laboratory results for such holes had
anomalous values, the data was disqualified and
 
not used.
 
Logging
>
 
Whether core and chip samples have been geologically
 
and geotechnically
logged to a level of detail to support appropriate
 
Mineral Resource estimation,
mining studies and metallurgical studies.
>
 
Whether logging is qualitative or quantitative
 
in nature. Core (or costean,
channel, etc.) photography.
>
 
The total length and percentage of the relevant
 
intersections logged.
>
 
A wide variety of core-logging techniques exist for
 
the properties.
 
For many of the
core holes, the primary data source is a generalized
 
lithology description by the
driller, in some cases supplemented by a more detailed core log
 
completed by a
geologist.
 
>
 
The logging of core thickness and depth is quantitative.
 
With the exception of the
coal seams, logging of rock strata type is more subjective
 
and best considered as
qualitative.
Sub-sampling
techniques and
sample
preparation
>
 
If core, whether cut or sawn and whether quarter, half or all
 
core taken.
>
 
If non-core, whether riffled, tube sampled, rotary split, etc.
 
and whether
sampled wet or dry.
>
 
For all sample types, the nature, quality and appropriateness
 
of the sample
preparation technique.
>
 
Quality control procedures adopted for all sub-sampling
 
stages to maximise
representivity
 
of samples.
>
 
Measures taken to ensure that the sampling is representative
 
of the in situ
material collected, including for instance results for
 
field duplicate/second-half
sampling.
>
 
Whether sample sizes are appropriate to the grain
 
size of the material being
sampled.
>
 
Typical US practice in the Appalachian Basin is that core samples
 
for deep
mineable core samples are not sawn or subsampled
 
(since seams are not of great
thickness and the entire seam is mined and co-mingled).
>
 
Oftentimes, core for surface-mineable coal seams are
 
bench sampled separately
by the various coal and rock layers (plies).
>
 
MM&A has exercised diligence to use only those
 
analyses that are representative
of the coal quality parameters for the appropriate
 
mining type for each sample.
Quality of assay
data and
laboratory tests
>
 
The nature, quality and appropriateness of the assaying
 
and laboratory
procedures used and whether the technique is considered
 
partial or total.
>
 
For geophysical tools, spectrometers, handheld XRF
 
instruments, etc., the
parameters used in determining the analysis including
 
instrument make and
model, reading times, calibrations factors applied and
 
their derivation, etc.
>
 
Nature of quality control procedures adopted (e.g.
 
standards, blanks,
duplicates, external laboratory checks) and whether
 
acceptable levels of
accuracy (i.e. lack of bias) and precision have
 
been established.
>
 
Sample analysis was typically carried out by accredited
 
US laboratories.
 
>
 
Standard procedure upon receipt of core samples
 
by the testing laboratory is to log
the depth and thickness of the sample, then perform
 
testing as specified by a
representative of the operating company.
 
Each sample is then analyzed in
accordance with procedures defined under
American Society for Testing and
Materials (
ASTM
)
 
standards including, but not limited to; washability
 
(ASTM
D4371); ash (ASTM D3174); sulfur (ASTM D4239);
 
Btu/lb. (ASTM D5865); volatile
matter (ASTM D3175); Free Swell Index (
FSI
) (ASTM D720).
>
 
Geophysical tools are calibrated by the logging
 
company and where possible,
validated using a calibration hole.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
Criteria
JORC Code explanation
Commentary
Verification of
sampling and
assaying
>
 
The verification of significant intersections by either
 
independent or alternative
company personnel.
>
 
The use of twinned holes.
>
 
Documentation of primary data, data entry procedures,
 
data verification, data
storage (physical and electronic) protocols.
>
 
Discuss any adjustment to assay data.
>
 
All coal intersection data used to generate the geologic
 
model has been cross
referenced with the lithological and geophysical logs
 
by MM&A.
>
 
Laboratory quality was adjusted from dry basis
 
to reflect the anticipated marketable
product moisture.
>
 
Coal quality results were verified by spot-check with
 
laboratory analysis sheets by
MM&A before inclusion into the geologic model
 
and use in the resource estimate.
Location of data
points
>
 
Accuracy and quality of surveys used to locate drill
 
holes (collar and down-
hole surveys), trenches, mine workings and other
 
locations used in Mineral
Resource estimation.
>
 
Specification of the grid system used.
>
 
Quality and adequacy of topographic control.
>
 
Due to the long history of exploration by various
 
parties on the Properties, a wide
variety of survey techniques exist for documentation of
 
data point locations.
 
Many
of the older exploration drill holes appear to have
 
been located by ground survey;
more recently completed drill holes are often located
 
by high-resolution Global
Positioning System (
GPS
) units.
>
 
Grid systems used are typically the State Plane Coordinate
 
System pertinent to
each property.
 
>
 
Topography is based on either the USGS topographic 7.5-minute quadrangle maps
or on recent aerial photogrammetry as necessary
 
(subject to availability).
Data spacing and
distribution
>
 
Data spacing for reporting of Exploration Results.
>
Whether the data spacing and distribution is sufficient
 
to establish the
degree of geological and grade continuity appropriate
 
for the Mineral
Resource and Ore Reserve estimation procedure(s)
 
and classifications
applied.
>
 
Whether sample compositing has been applied.
>
 
Spacing and distribution of data point information
 
may vary from seam to seam
within each mining area.
 
The areas estimated for coal resource and
 
coal reserve
tonnes have been limited so that the data spacing
 
and distribution is sufficient to
establish the degree of geological continuity appropriate
 
for the estimation and
classification of the coal tonnes.
 
>
 
All of the coal resource tonnes are in the measured,
 
indicated, and inferred
categories, and all of the coal reserve tonnes are in
 
the proved and probable
categories in accordance with the JORC Code and
 
SEC standards.
 
Orientation of
data in relation to
geological
structure
>
 
Whether the orientation of sampling achieves unbiased
 
sampling of possible
structures and the extent to which this is
 
known, considering the deposit type.
>
 
If the relationship between the drilling orientation and
 
the orientation of key
mineralised structures is considered to have introduced
 
a sampling bias, this
should be assessed and reported if material.
>
 
Drill holes have been vertically drilled.
 
No downhole deviation logs have been
collected and it is therefore not known if the drill
 
holes have deviated away from
vertical.
 
Based on the relatively shallow seam depths,
 
any deviation is expected to
be insignificant and immaterial to the geologic
 
characterization of the property.
>
 
The dip of the coal seams is relatively minor
 
and not a material issue for
representation of seam thickness or quality.
Sample security
The measures taken to ensure sample security.
>
 
Sample handling procedures employed by explorationists
 
follow typical US protocol
and should be adequate to insure sample security.
Audits or reviews
The results of any audits or reviews of
 
sampling techniques and data.
>
 
MM&A has reviewed all available geological information
 
for the Properties in
developing the geologic model.
 
Only that data deemed suitable has been used
 
for
the purpose of generating the resource and
 
reserve estimates.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
>
 
Type, reference name/number, location and ownership including agreements
or material issues with third parties such as joint
 
ventures, partnerships,
overriding royalties, native title interests, historical
 
sites, wilderness or national
park and environmental settings.
>
 
The security of the tenure held at the time of reporting
 
along with any known
impediments to obtaining a licence to operate
 
in the area.
>
 
The Coronado coal resources are located within
 
three of the United State of
America: Virginia; West Virginia; and Pennsylvania.
 
Control of these Properties is
governed by many hundreds of agreements.
>
 
MM&A has not carried out separate title verification
 
for the coal properties and has
not verified leases, deeds, surveys or other property
 
control instruments pertinent
to the subject resources.
 
>
 
Coronado has represented to MM&A that it controls the
 
mining rights to the coal
deposits as shown on its property maps, and
 
MM&A has accepted these as being
a true and accurate depiction of the mineral rights
 
controlled by Coronado.
 
The
TRS assumes the properties are developed under
 
responsible and experienced
management.
>
 
There are no known legal or environmental encumbrances
 
that would impede
development of the subject coal reserves.
Exploration done
by other parties
>
 
Acknowledgment and appraisal of exploration by other
 
parties.
>
 
The Properties have been extensively explored
 
by subsurface drilling efforts
carried out by numerous entities, most of which
 
were completed prior to acquisition
by Coronado.
>
 
This exploration work was generally performed to
 
prevailing US best practice
standards and deemed adequate for the purposes
 
of this TRS.
 
Geology
>
 
Deposit type, geological setting and style of mineralisation.
>
 
The Coronado coal resources are located within
 
the Northern and Central
Appalachian Coal Basins.
>
 
The coal deposits are Carboniferous in age, being
 
of the Pennsylvanian system.
>
 
Seam of economic significance typically range between
 
0.3 meters and 1.8 meters
in thickness, with relatively little structural deformation.
>
 
Regional structure is typically characterized by gently
 
dipping strata to the
northwest at less than one percent.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Criteria
JORC Code explanation
Commentary
Drill hole
Information
>
 
A summary of all information material to the understanding
 
of the exploration
results including a tabulation of the following information
 
for all Material drill
holes:
●
 
easting and northing of the drill hole collar
●
 
elevation or RL (Reduced Level – elevation above
 
sea level in metres) of
the drill hole collar
●
 
dip and azimuth of the hole
●
 
down hole length and interception depth
●
 
hole length.
>
 
If the exclusion of this information is justified on
 
the basis that the information
is not Material and this exclusion does not detract
 
from the understanding of
the report, the Competent Person should clearly explain
 
why this is the case.
>
 
MM&A reviewed and entered all pertinent data into
 
a digital geologic database for
each Coronado property.
 
The database consists of thousands of data records,
which include drill hole and supplemental coal
 
seam thickness measurements from
outcrop and mine exposures.
 
>
 
All drill holes in the database are provided
 
with a collar elevation and the State
Plane Coordinate System easting and northing coordinate.
>
 
After MM&A confirmed proper coal seam thickness and
 
correlation, the seam data
was modelled and compiled into coal resource maps.
>
 
The maps are provided in the TRS; however, a tabulation of the thousands
 
of
individual data records is not practical to include.
Data aggregation
methods
>
 
In reporting Exploration Results, weighting averaging
 
techniques, maximum
and/or minimum grade truncations (e.g. cutting of high
 
grades) and cut-off
grades are usually Material and should be stated.
>
 
Where aggregate intercepts incorporate short lengths
 
of high grade results
and longer lengths of low grade results, the
 
procedure used for such
aggregation should be stated and some typical examples
 
of such
aggregations should be shown in detail.
>
 
The assumptions used for any reporting of
 
metal equivalent values should be
clearly stated.
>
 
Where a coal seam has been bench sampled
 
(typically for surface mining) the
individual analyses for the coal plies are normally
 
weight-averaged to represent the
total of recoverable coal.
>
 
Coal quality summary results have been documented
 
in the TRS.
 
Average coal
quality on a per-seam basis is used to represent
 
the coal resources within a given
mining area.
>
 
Average coal quality for each Coronado complex is provided
 
in Tables 1-1, 1-2 and
1-3 of this TRS.
 
>
 
No other data aggregations methods are used.
Relationship
between
mineralisation
widths and
intercept lengths
>
 
These relationships are particularly important in the
 
reporting of Exploration
Results.
>
 
If the geometry of the mineralisation with respect
 
to the drill hole angle is
known, its nature should be reported.
>
 
If it is not known and only the down hole lengths
 
are reported, there should be
a clear statement to this effect (e.g. ‘down hole length,
 
true width not known’).
>
 
Coal thickness values from all coal intersections
 
and down hole geophysical logs
are considered to be vertical thicknesses.
 
Seam dip of approximately 2.0 to 3.0
degrees has little effect on the vertical thickness of the
 
seam.
Diagrams
>
 
Appropriate maps and sections (with scales) and tabulations
 
of intercepts
should be included for any significant discovery being
 
reported These should
include, but not be limited to a plan view of
 
drill hole collar locations and
appropriate sectional views.
>
 
Diagrams and maps showing the coal seam intercepts
 
are presented in the TRS.
Balanced
reporting
>
 
Where comprehensive reporting of all Exploration Results
 
is not practicable,
representative reporting of both low and high grades
 
and/or widths should be
practiced to avoid misleading reporting of Exploration
 
Results.
>
 
All of the available, qualified exploration data has
 
been included within the
tabulations, maps, and diagrams for this TRS.
>
 
Both coal thickness and quality data are deemed
 
by MM&A to be reasonably
sufficient within the resource areas. Therefore, there is a
 
reasonable level of
confidence in the geologic interpretations required for
 
coal resource determination
based on the available data and the techniques applied
 
to the data.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
Criteria
JORC Code explanation
Commentary
Other substantive
exploration data
>
 
Other exploration data, if meaningful and material,
 
should be reported
including (but not limited to): geological observations;
 
geophysical survey
results; geochemical survey results; bulk samples –
 
size and method of
treatment; metallurgical test results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or
 
contaminating substances.
>
 
Informational material available from the U.S. Geological
 
Survey and the respective
State Surveys was used to assist in the Resource
 
estimate.
 
Further work
>
 
The nature and scale of planned further work (e.g.
 
tests for lateral extensions
or depth extensions or large-scale step-out drilling).
>
 
Diagrams clearly highlighting the areas of possible
 
extensions, including the
main geological interpretations and future drilling areas,
 
provided this
information is not commercially sensitive.
>
 
Further work is expected to include additional exploration,
 
geotechnical testing,
coal quality analyses, and coal property acquisition.
 
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
Section 3 Estimation and Reporting of Mineral Resources
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Database
integrity
>
 
Measures taken to ensure that data has not been
 
corrupted by, for
 
example,
transcription or keying errors, between its initial collection and its use for
Mineral Resource estimation
 
purposes.
>
 
Data validation procedures
 
used.
>
 
MM&A confirmed coal seam thickness and correlations
 
in databases used for coal
deposit modelling.
 
Representative records were spot-checked for
 
data entry
validation.
 
>
 
Geophysical logs were used wherever available
 
to assist in confirming the seam
correlation and to verify proper seam thickness measurements
 
and recovery of coal
samples.
Site
visits
>
 
Comment on
 
any site
 
visits undertaken
 
by the
 
Competent Person and the
outcome of those visits.
>
 
If no
 
site visits
 
have been
 
undertaken indicate why
 
this is the case.
>
 
MM&A is very familiar with the Properties and
 
has conducted multiple site visits
throughout the years.
Geological
interpretation
>
 
Confidence in (or conversely,
 
the uncertainty
 
of) the geological interpretation
 
of
the mineral deposit.
>
 
Nature of the data used and of
 
any assumptions made.
>
 
The effect,
 
if any,
 
of alternative interpretations on
 
Mineral Resource estimation.
>
 
The use of geology in guiding
 
and controlling Mineral Resource estimation.
>
 
The factors affecting continuity both
 
of grade and geology.
>
 
Due to the relative structural simplicity of the deposits
 
and the reasonable continuity
of the tabular coal beds, the principal geological
 
interpretation necessary to define
the geometry of the coal deposits is the proper
 
modeling of their thickness and
elevation.
 
>
 
Both coal thickness and quality data are deemed
 
by MM&A to be reasonable within
the resource areas.
 
>
 
Therefore, there is a reasonable level of confidence
 
in the geologic interpretations
required for coal resource determination based on
 
the available data and the
techniques applied to the data.
Dimensions
>
 
The extent and variability of the Mineral Resource expressed as length (along
strike or otherwise), plan width, and depth below surface to the upper and lower
limits of the Mineral Resource.
>
 
The subject coal resource areas mostly exist in
 
discreet, individual deposits of highly
variable dimensions, shapes and depth below the
 
ground surface.
>
 
Such factors are best depicted in the maps contained
 
in the TRS.
>
 
Details of the parameters are cited within the
 
TRS and included in the table of Cut-off
Parameters listed in Section 11.1 of the TRS.
 
Estimation
and
modelling
techniques
>
 
The nature and appropriateness of the estimation technique(s) applied and key
assumptions, including treatment of extreme grade values, domaining,
interpolation parameters and maximum distance of extrapolation from data
points. If a computer assisted estimation method was chosen include a
description of computer software and
 
parameters used.
>
 
The availability of check estimates, previous estimates and/or mine production
records and whether the Mineral Resource estimate takes
 
appropriate account
of
 
such data.
>
 
The assumptions made regarding
 
recovery of by-products.
>
 
Geological data was imported into Carlson Mining
®
 
(formerly SurvCADD
®
) geological
modelling software in the form of Microsoft
®
 
Excel files incorporating, drill hole
collars, seam and thickness picks, bottom seam elevations
 
and raw and washed coal
quality. These data files were validated prior to importing into the software.
>
 
Once imported, a geologic model was created.
>
 
The geological model was verified and reviewed.
 
>
 
Resources were estimated by defining seam thickness
 
at each point of observation
and by defining resource confidence arcs around
 
the points of observation.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
Criteria
JORC Code explanation
Commentary
>
 
Estimation of deleterious elements or other non-grade variables of economic
significance (e.g. sulphur for acid mine drainage characterisation).
>
 
In the case
 
of block model interpolation, the
 
block
 
size in relation to the
average sample spacing and the search employed.
>
 
Any assumptions behind modelling of
 
selective mining units.
>
 
Any assumptions about
 
correlation between variables.
>
 
Description of how the
 
geological interpretation was used to control the
resource estimates.
>
 
Discussion of basis for using or not
 
using grade cutting or capping.
>
 
The process of validation, the
 
checking process used, the comparison of model
data to drill hole data, and
 
use of reconciliation data if available.
>
 
Points of observation for Measured and Indicated
 
confidence arcs were defined for
all drill holes that intersected the seam.
 
>
 
As prescribed by the common United States
 
classification system the following
distances from points of observation were used
 
to define the corresponding
Resource category arcs:
-
 
Inferred Resources – greater than 3,960 feet (1.2
 
kilometers) but less than 15,840
feet (4.8 kilometers)
-
 
Indicated Resources – 3,960 feet (1.2 kilometers)
-
 
Measured Resources – 1,320 feet (0.4 kilometers)
>
 
The use of the standards commonly used in the
 
United States are appropriate and
customary for this resource jurisdiction and deposition
 
type.
>
 
MM&A performed a geostatistical analysis test
 
of the Coronado data sets using the
Drill Hole Spacing Analysis (
DHSA
) method.
>
 
Based on MM&A’s analysis, it would be possible to extend the measured,
 
indicated
and inferred arcs slightly beyond historically accepted
 
practices due to consistent
geological settings. The QP’s have elected not to extend
 
arc distances, introducing a
level of conservatism in the coal classification.
Moisture
>
 
Whether the tonnages are estimated on a dry basis
 
or with natural moisture,
and the method of determination of the moisture
 
content.
>
 
Coal resource tonnes are presented on a dry, in-situ basis.
>
 
Reserve tonnes are presented on a moist basis at
 
anticipated product moisture
ranging from 4.0 to 6.0 percent. Moisture content
 
based on historic analyses of
shipped coal.
Cut-off
Parameters
>
 
The basis of the adopted cut-off grade(s) or quality parameters
 
applied.
>
 
The cut-off parameters were tailored for each of the
 
Coronado properties to be in
accordance with mining/ processing capabilities and
 
market conditions prevalent at
each operation.
>
 
Examples include minimum recoverable coal thickness,
 
acceptable ash content and
wash recovery, and manageable overburden to coal ratio for surface mineable
 
coal.
>
 
Details of the parameters are cited within the
 
TRS and included in the table of Cut-off
Parameters listed in Section 11.1 of this TRS.
>
 
These cut-off parameters have been developed by MM&A
 
based on its experience
with the Coronado properties and other mining
 
operations of the Central Appalachian
coal basin.
 
This experience includes technical and economic
 
evaluations of
numerous properties in the region for the purposes
 
of determining the economic
viability of the subject coal reserves.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
9
Criteria
JORC Code explanation
Commentary
Mining factors or
assumptions
>
 
Assumptions made regarding possible mining methods,
 
minimum mining
dimensions and internal (or, if applicable, external) mining dilution.
 
It is always
necessary as part of the process of determining
 
reasonable prospects for
eventual economic extraction to consider potential
 
mining methods, but the
assumptions made regarding mining methods and parameters
 
when estimating
Mineral Resources may not always be rigorous.
 
Where this is the case, this
should be reported with an explanation of the
 
basis of the mining assumptions
made.
>
 
Mining factors such as dilution, mining and washing
 
recovery are variable and have
been applied at the coal deposits at each operation
 
based on site-specific
characteristics.
>
 
Details of the factors are cited within the TRS.
>
 
Factors that would typically preclude conversion of a
 
coal resource to coal reserve
include the following: inferred resource classification;
 
absence of coal quality; poor
mine recovery; lack of access; insufficient exploration; or
 
uncontrolled surface
property for areas of proposed for surface mining.
 
>
 
While such factors were used to preclude the conversion
 
of a very limited number of
coal resources to coal reserves in this report,
 
the extensive history of mining on the
Properties would suggest that there are reasonable prospects
 
for eventual economic
extractions of all coal resources under favorable
 
market conditions.
Metallurgical
factors or
assumptions
>
 
The basis for assumptions or predictions regarding
 
metallurgical amenability. It
is always necessary as part of the process of
 
determining reasonable prospects
for eventual economic extraction to consider potential
 
metallurgical methods,
but the assumptions regarding metallurgical treatment
 
processes and
parameters made when reporting Mineral Resources may
 
not always be
rigorous. Where this is the case, this should be reported
 
with an explanation of
the basis of the metallurgical assumptions made.
>
 
The products mined from coal resources controlled by
 
Coronado can be sold into
high-, mid-, and low-volatile metallurgical coal markets
 
because of their inherent
quality characteristics.
 
>
 
Run-of-mine production is washed at the coal preparation
 
plants as needed for
quality control.
 
>
 
Coronado may blend production from multiple
 
sources to manage ash and sulfur
content along with the rheological and petrographic
 
characteristics of the shipped
products.
 
Environmental
factors or
assumptions
>
 
Assumptions made regarding possible waste and
 
process residue disposal
options. It is always necessary as part of the process
 
of determining reasonable
prospects for eventual economic extraction to consider
 
the potential
environmental impacts of the mining and processing
 
operation.
 
While at this
stage the determination of potential environmental impacts,
 
particularly for a
greenfields project, may not always be well advanced,
 
the status of early
consideration of these potential environmental impacts
 
should be reported.
Where these aspects have not been considered
 
this should be reported with an
explanation of the environmental assumptions made.
>
 
MM&A completed a Limited Phase I Environmental Site
 
Assessment (ESA) on the
Buchanan property in April 2016, and on the Logan
 
County and Greenbrier
Properties in May 2017 on behalf of Coronado.
 
Coronado reports not having
conducted such a study since the MM&A studies.
 
>
 
The ESAs completed by MM&A included a site inspection,
 
review of historical
records, a database search of State and Federal
 
regulatory records and interviews to
identify potential recognized environmental conditions (RECs)
 
that may create
environmental liability for the sites.
 
>
 
MM&A identified one REC at Greenbrier associated
 
with stained soil and gravel near
a fueling and maintenance area.
 
Coronado reported to MM&A that satisfactory
clean-up efforts were completed at Greenbrier.
 
>
 
Based on these former ESAs completed by MM&A,
 
it is MM&A’s opinion that
Coronado has a generally typical coal industry
 
record of compliance with applicable
mining, water quality, and environmental laws.
 
Estimated costs for mine closure,
including water quality monitoring during site reclamation,
 
are included in the TRS
financial models.
 
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
10
Criteria
JORC Code explanation
Commentary
Bulk density
>
 
Whether assumed or determined. If assumed, the
 
basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the
measurements, the nature, size and representativeness
 
of the samples.
>
 
The bulk density for bulk material must have been
 
measured by methods that
adequately account for void spaces (vugs, porosity, etc), moisture and
differences between rock and alteration zones within the deposit.
>
 
Discuss assumptions for bulk density estimates
 
used in the evaluation process
of the different materials.
>
 
Laboratory derived seam densities measured in
 
specific gravity were used where
available.
 
As needed, these data were supplemented by estimated
 
seam density
values based on the relative proportion of
 
coal and non-coal material within the seam
(typically at 1.30 and 2.25 specific gravity, respectively).
>
 
Average seam density was determined for each coal deposit
 
and used to convert
coal volumes into coal tonnage estimates.
Classification
>
 
The basis for the classification of the Mineral Resources
 
into varying confidence
categories.
>
 
Whether appropriate account has been taken
 
of all relevant factors (i.e. relative
confidence in tonnage/grade estimations, reliability
 
of input data, confidence in
continuity of geology and metal values, quality, quantity and distribution
 
of the
data).
>
 
Whether the result appropriately reflects the
 
Competent
>
 
Person’s view of the deposit.
>
 
The Resource has been classified based on suitable
 
distances from points of
observations prescribed in the common United States
 
classification system.
>
 
The use of the United States standards is appropriate
 
and customary for this
resource jurisdiction and deposition type.
>
 
MM&A performed a geostatistical analysis test
 
of the Coronado data sets using the
Drill Hole Spacing Analysis (
DHSA
) method.
>
 
Based on MM&A’s analysis, it would be possible to extend the measured,
 
indicated
and inferred arcs slightly beyond historically accepted
 
practices due to consistent
geological settings. The QP’s have elected not to extend
 
arc distances, introducing a
level of conservatism in the coal classification.
>
 
All relevant factors have been accounted for and
 
reflect the Competent Person’s
view of the deposit.
Audits or reviews
>
 
The results of any audits or reviews of Mineral
 
Resource estimates.
>
 
MM&A completed prepared a statement of coal resources
 
and reserves for the
Properties in accordance with the JORC Code
 
as of December 31, 2017.
 
MM&A
also subsequently updated the estimate of resources
 
and reserves for depletion as
of December 31, 2018, December 31, 2019, and
 
December 31, 2020.
>
 
MM&A performed a previous audit of the Properties
 
in year 2017 for Coronado
based on U.S. Securities and Exchange Commission
 
(SEC) Industry Guide 7 and
USGS Circular 891 standards.
 
>
 
Earlier audits were performed by various independent
 
consultants for predecessors-
in-title to Coronado and at various levels of detail
 
depending on the clients concerns
and the allotted time for completion.
 
Previous audits and reviews defined the
primary coal resource areas and estimated the recoverable
 
tonnes for each seam
based on the expected mining methods.
 
>
 
Additionally, MM&A has performed proprietary evaluations for predecessors-in-title
to Coronado, which encompass portions of the Properties
 
included in this TRS.
Discussion of
relative
accuracy/
confidence
>
 
Where appropriate a statement of the relative accuracy
 
and confidence level in
the Mineral Resource estimate using an approach
 
or procedure deemed
appropriate by the Competent Person. For example,
 
the application of statistical
or geostatistical procedures to quantify the relative
 
accuracy of the resource
within stated confidence limits, or, if such an approach is not deemed
>
 
The relative accuracy of and confidence in the coal
 
tonnage and quality estimates
provided herein are judged to be in conformance
 
with current industry best-practices.
>
 
The representation of average coal quality characteristics
 
should be understood to
represent a reasonably representative sampling
 
that is generally indicative of coal
quality and does not represent a statistically rigorous
 
approach to coal quality
modeling.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
11
Criteria
JORC Code explanation
Commentary
appropriate, a qualitative discussion of the factors that
 
could affect the relative
accuracy and confidence of the estimate.
>
 
The statement should specify whether it relates
 
to global or local estimates,
and, if local, state the relevant tonnages, which
 
should be relevant to technical
and economic evaluation. Documentation should include
 
assumptions made
and the procedures used.
>
 
These statements of relative accuracy and confidence
 
of the estimate should be
compared with production data, where available.
>
 
Resource estimation has been completed using standard
 
coal estimation methods
which are deemed appropriate for this deposit.
Section 4 Estimation and Reporting of Ore Reserves
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral Resource
estimate for
conversion to Ore
Reserves
 
>
 
Description of the Mineral Resource estimate used
 
as a basis for the
conversion to an Ore Reserve.
>
 
The coal resource estimate was prepared
 
as part of the report Coronado Global
Resources Inc. Statement of Coal Resources and
 
Reserves in Accordance with
JORC Code and United States SEC Standards
 
as of December 31, 2021 –
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and
Pennsylvania, USA – February 2022 prepared
 
by MM&A.
>
 
The resource estimation criteria were developed by
 
MM&A based on the capabilities
of the mining equipment used within the production
 
model and on industry-accepted
standards to assure that the basic geologic characteristics
 
of the coal resources are
in reasonable conformity with those to be mined and
 
marketed by Coronado.
>
 
Clear statement as to whether the Mineral Resources
 
are reported additional
to, or inclusive of, the Ore Reserves.
>
 
Coal resources generally are reported inclusive of
 
the coal reserves.
 
In some
cases, resources are reported in addition to
 
coal reserves.
 
Tables 1-1 and 11
 
-3 of
the TRS clearly identify resources “inclusive of mine
 
plan” from which coal reserves
were estimated along with those resources “exclusive
 
of mine plan” from which no
reserves were estimated.
 
Site visits
 
>
 
Comment on any site visits undertaken by the
 
Competent Person and the
outcome of those visits.
>
 
MM&A is very familiar with the Properties and
 
has conducted multiple site visits
throughout the years.
Study status
 
>
 
The type and level of study undertaken to
 
enable Mineral Resources to be
converted to Ore Reserves.
>
 
A preliminary feasibility LOM plan was prepared by
 
MM&A for active and proposed
mines.
 
>
 
The Code requires that a study to at least Pre-Feasibility
 
Study level has been
undertaken to convert Mineral Resources to Ore
 
Reserves. Such studies will
have been carried out and will have determined a
 
mine plan that is technically
achievable and economically viable, and that material
 
Modifying Factors have
been considered.
>
 
This geologic evaluation conducted in accordance
 
with JORC and SEC standards
and in conjunction with the preliminary feasibility
 
study is sufficient to conclude that
the surface, highwall miner and underground
 
coal reserves identified on the
Properties are economically mineable under reasonable
 
expectations of market
prices for thermal and metallurgical coal products, estimated
 
operation costs, and
capital expenditures.
>
 
The pre-feasibility financial models, prepared by MM&A
 
for this TRS, was developed
to test the economic viability of each coal resource
 
area.
>
 
Proved and probable coal reserve were derived
 
from the defined in-situ coal
resource considering relevant processing, economic (including
 
independent
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
12
Criteria
JORC Code explanation
Commentary
estimates of capital, revenue and cost, marketing, legal,
 
environmental,
socioeconomic, and regulatory factors).
Cut-off parameters
>
 
The basis of the adopted cut-off grade(s) or quality parameters
 
applied.
>
 
The cut-off parameters were tailored for each of the
 
Coronado properties to be in
accordance with mining/ processing capabilities and
 
market conditions prevalent at
each operation.
>
 
Examples include minimum recoverable coal thickness,
 
acceptable ash content and
wash recovery, and manageable overburden to coal ratio for surface mineable
 
coal.
>
 
Details of the parameters are cited within the TRS and
 
included in the table of Cut-
off Parameters listed in Section 11.1 of this TRS.
>
 
These cut-off parameters have been developed by MM&A
 
based on its experience
with the Coronado properties and are typical of
 
mining operations in the Central
Appalachian coal basin.
 
This experience includes technical and economic
evaluations of numerous properties in the region
 
for the purposes of determining the
economic viability of the subject coal reserves.
Mining factors or
assumptions
 
>
 
The method and assumptions used as reported
 
in the Pre-Feasibility or
Feasibility Study to convert the Mineral Resource to an
 
Ore Reserve (i.e. either
by application of appropriate factors by optimisation
 
or by preliminary or
detailed design).
>
 
After validating coal seam data and establishing
 
correlations, the thickness and
elevation for seams of economic interest were used
 
to generate a geologic model.
>
 
A pre-feasibility LOM plan was prepared
 
by MM&A for active and proposed mines.
 
MM&A prepared mine projections and production timing
 
forecasts based on coal
seam characteristics.
 
Production timing was carried out from 2022
 
to depletion
(exhaustion) of the coal reserve areas.
>
 
The choice, nature and appropriateness of the selected
 
mining method(s) and
other mining parameters including associated design
 
issues such as pre-strip,
access, etc.
>
 
The room-and-pillar mining method was selected to
 
model the underground mining
resources, utilizing continuous miners for coal extraction,
 
shuttle cars for production
section haulage and roof bolters for roof control,
 
with the exception that the
Buchanan Mine also uses longwall shearers, armored
 
face conveyors, and
hydraulic self-advancing roof support.
 
The resource areas located above drainage
are relatively small and often have irregular
 
boundaries.
The Buchanan Mine in
Buchanan County, Virginia is the only active longwall mine currently being operated
by Coronado.
>
 
The Coronado underground mining resource areas
 
which are located above-
drainage require an access road and mine access
 
development along the outcrop,
whereas below-drainage mines are accessed via shaft or
 
slope based on other
proposed surface infrastructure locations and/or surface
 
property control.
 
>
 
The surface mining method selected utilizes highly productive
 
hydraulic shovels,
front-end loaders, large tractors and rock trucks
 
for overburden removal.
 
The
mobile equipment spreads adapt readily to winding
 
coal outcrops for contour
surface mining and are effective for point-removal and area
 
mining applications.
>
 
Application of highwall and auger mining units
 
is an effective method to recover coal
resources not suitable for underground mining and under
 
excessive cover for
surface mining.
>
 
The assumptions made regarding geotechnical parameters
 
(e.g. pit slopes,
stope sizes, etc.), grade control and pre-production
 
drilling.
>
 
Mining plans for potential underground mines were
 
developed by MM&A.
 
Pillar
stability was tested by MM&A using the
Analysis of Coal Pillar Stability (ACPS
)
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
13
Criteria
JORC Code explanation
Commentary
program that was developed by the
National Institute for Occupational Safety
and Health (
NIOSH
)
.
 
>
 
Coronado must obtain approved mining plans from
United States Department of
Labor Mine Safety and Health Administration (
MSHA
)
that define safety
parameters for the highwalls developed during
 
contour and area mining.
 
MM&A’s
planning model does not require input of specific
 
highwall design parameters, but
provides for timing of mining within mine plan polygons
 
that is representative of the
operation performance attained at Central Appalachia
 
surface mines.
>
 
Highwall and auger mining is conducted under highwalls
 
designed and constructed
to meet MSHA permit requirements.
 
To better assure highwall stability and safety
during highwall coal extraction, MSHA requires that
 
coal fenders, or stumps, be left
in place between successive cuts. Periodic barrier pillars
 
must be left in place as an
additional safeguard.
 
MM&A has adjusted the expected mining recovery
 
for
highwall and auger mining resources to reflect
 
highwall stability and safety
requirements.
>
 
The major assumptions made and Mineral Resource
 
model used for pit and
stope optimisation (if appropriate).
>
 
Underground Mining Resources:
 
For metallurgical resources, minimum coal seam
thickness extends down to between 0.6 and 1.2
 
meters and a minimum overburden
(depth of cover) of 30.5 meters.
 
A 61-meter horizontal distance is maintained from
abandoned mines and sealed or pillared areas,
 
and a 30-meter horizontal distance
is maintained from planned highwall miner panels.
 
Mine recovery is reduced when
a rider coal seam is present within a 1.5- to 3.0-meter
 
interval above the coal seam.
 
No mining is projected when the interval between
 
overlying and underlying reserves
is less than 12 meters.
>
 
Surface Mining Resources:
 
For classification as a surface-mineable resource, a
seam must be at least 0.3 meters in thickness
 
as a stand-alone (principle) seam
and 0.15 meters in thickness when less than
 
0.8 meters from a principle seam.
 
The
maximum cumulative area mining strip ratio is generally
 
20:1 for thermal coal and
30:1 for metallurgical coal.
 
Some areas were assessed for their economic viability
at higher ratios, and were included as reserves
 
if deemed economic.
 
For contour
surface mining, a minimum of 38-meter bench is
 
provided to support HWM.
>
 
HWM and Auger Mining Resources: HWM cut depth (penetration)
 
is established at
a maximum of 244 meters.
 
The minimum mineable coal thickness is limited
 
at 0.6
meters. For coal seams less than 0.8 meters
 
thick, roof and/or floor characteristics
must allow OSD cutting to maintain a 0.8-meter
 
minimum cutting height.
Auger
mining cut depth is established at an average
 
of 91 meters.
 
The minimum mineable
coal thickness is limited at 0.5 meters.
>
 
The mining dilution factors used.
>
 
Underground Mining Reserves:
 
The planning model assigns minimum mining
heights of 1.4 to 1.8 meters for mains and panel
 
development.
 
At the Buchanan
Mine, a minimum mining height of 1.8 meters
 
was used due to the longwall mining
method being employed.
 
For coal seams thinner than the assigned mining
 
height,
the difference between the coal seam height and assigned
 
mining height consists of
OSD.
 
In all cases a minimum of 0.05 meters
 
of OSD was assumed, with the
exception of the Mon Valley mines, where a minimum 0.15 meters of OSD was
assumed due to weaker floor strata.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
14
Criteria
JORC Code explanation
Commentary
>
 
Surface Mining Reserves:
 
Area mining is generally limited to a cumulative
overburden ratio of 30:1 and a 15:1 ratio for
 
contour mining.
 
Exceptions were
considered for mining of metallurgical grade coal where
 
deemed economical.
 
It is
assumed that careful cleaning of exposed coal pits will
 
result in minimal OSD.
>
 
HWM and Auger Mining Reserves:
 
The mining plan assumes that the HWM cutting
height is a minimum of 76 to 99 centimeters
 
for clearance purposes.
 
When the coal
seam is less than 76 to 99 centimeters thick, OSD
 
assumed and included in the
ROM product.
Because the auger has very limited OSD cutting ability, it is assumed
that an appropriate auger diameter will be
 
chosen based on the coal seam
thickness and that OSD will be minimal.
>
 
The mining recovery factors used.
>
 
Underground Mining Reserves:
 
Mine recovery generally varies between 40 and
 
60
percent for continuous mining panels, and 100
 
percent for longwall.
>
 
Surface Mining Reserves:
 
Mining recovery is 90 percent for virgin areas.
 
Mining
recovery is reduced where second mining is
 
projected in previously underground
and auger mined areas.
>
 
HWM and Auger Mining Reserves:
 
A mine recovery of 40 percent has been applied
for HWM.
A mine recovery of 35 percent has been
 
applied for auger mining.
>
 
Any minimum mining widths used.
>
 
Underground Mining Reserves:
 
Typical entry width is 5.8 to 6.1 meters.
>
 
The manner in which Inferred Mineral Resources
 
are utilised in mining studies
and the sensitivity of the outcome to their inclusion.
>
 
Proved and probable coal reserve were derived
 
from the defined in-situ coal
resource considering relevant processing, economic (including
 
independent
estimates of capital, revenue and cost, marketing, legal,
 
environmental,
socioeconomic, and regulatory factors).
>
 
Mine plan LOM tonnage includes inferred coal and
 
those areas that do not meet the
minimum coal thickness requirement for classification as
 
reserve.
 
Inferred coal
represents approximately 0.6% of the LOM production
 
for Mon Valley and 0.04% of
the total LOM production for Logan.
 
None of this coal was included in the estimate
of reserves
 
>
 
The infrastructure requirements of the selected mining
 
methods.
>
 
Underground Mining Resources:
 
The continuous mining method provides for the
extraction of coal from the production faces using
 
continuous miners (and longwall
shearing machine at Buchanan) and haulage using
 
shuttle cars or battery haulers to
a feeder-breaker located at the tail of the section
 
conveyor belt.
 
The feeder-breaker
crushes large pieces of coal and rock and regulates
 
coal feed onto the mine
conveyor.
 
A chain conveyor is used to remove coal from
 
the longwall face at the
Buchanan Mine for placement onto the conveyor belt
 
which is ultimately delivered to
an underground storage bunker.
 
Roof-bolting machines are used to install roof
bolts, and battery scoops are available to clean the
 
mine entries and assist in
delivery of mine supplies to work areas.
 
Surface ventilation fans are installed as
needed to provide a sufficient volume of air to ventilate production
 
sections, coal
haulage and transport entries, battery charging stations,
 
and transformers in
accordance with approved plans.
>
 
Coronado currently operates three coal preparation
 
plants, one each at the
Buchanan, Logan County and Greenbrier Divisions.
 
The Buchanan Plant operates
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
15
Criteria
JORC Code explanation
Commentary
at a feed rate of approximately 907 raw tonnes
 
per hour (
tph
), whereas the
Saunders Plant (Logan County Division) has a nominal
 
feed rate of 816 tph, and the
Mountaineer Plant (Greenbrier Division) operates
 
at 544 tph.
MM&A has included
capital estimates for construction of additional
 
coal preparation plants at the Russell
County and Mon Valley Complex for the purposes of this TRS.
 
>
 
Surface Mining Resources: The surface mining
 
mobile equipment spreads advance
the contour and area mining pits while systematically
 
reclaiming the trailing side of
pits where coal has been removed.
 
The coal haul roads are extended and
maintained as the pits advance.
 
Support facilities are maintained nearby but
 
away
from the active mining, and include storage areas
 
for blasting agents, fuel and
lubricants, and mine supplies along with maintenance
 
facilities and offices.
 
Most of
the surface mine production is transported to a loading
 
point for crushing, blending
and direct-shipment to customers.
 
>
 
HWM and Auger Resources: The HWM equipment advances
 
along with the contour
mining pits.
 
The rate of advance of the contour mining
 
is governed by the
advancement rate of the HWM.
 
A diesel-powered generator trails the highwall
miner and powers the continuous mining unit.
 
Other support facilities are provided
along with the contour mining support facilities.
 
HWM production is all transported
by truck to the coal preparation plant for washing.
Metallurgical
factors or
assumptions
 
>
 
The metallurgical process proposed and the appropriateness
 
of that process to
the style of mineralisation.
>
 
Coarse material is washed in a heavy medium
 
vessel.
 
Intermediate-size material is
washed in heavy medium cyclones.
 
Fine material is washed using conventional
froth flotation cells.
>
 
Whether the metallurgical process is well-tested technology
 
or novel in nature.
>
 
Processes are typical of those used in the
 
coal industry and are in use at adjacent
coal processing plants.
>
 
The nature, amount and representativeness of metallurgical
 
test work
undertaken, the nature of the metallurgical domaining applied
 
and the
corresponding metallurgical recovery factors applied.
>
 
The quality characteristics for the subject coal resources
 
and coal reserves have
been reviewed in detail by MM&A.
 
The drill hole data were utilized to develop
average coal quality characteristics mining site.
 
These average coal quality
characteristics were then utilized as the basis for determining
 
the various markets
into which the saleable coal will likely be placed.
>
 
Any assumptions or allowances made for deleterious
 
elements.
>
 
No significant effects on product quality are anticipated
 
from dilution material; float
product quality was used to model final product
 
quality.
>
 
The existence of any bulk sample or pilot scale
 
test work and the degree to
which such samples are considered representative of
 
the orebody as a whole
>
 
No bulk sample or pilot scale work has been completed.
>
 
For minerals that are defined by a specification,
 
has the ore reserve estimation
been based on the appropriate mineralogy to meet
 
specifications?
>
 
Notwithstanding the complexity of the coal quality data set,
 
the seams of the central
and northern Appalachian coalfields have a long history
 
of providing both high-Btu
thermal coals and high-, mid- and low-volatile coking
 
coals with favorable
metallurgical properties.
Environmental
 
>
 
The status of studies of potential environmental impacts
 
of the mining and
processing operation. Details of waste rock characterisation
 
and the
consideration of potential sites, status of design options
 
considered and, where
>
 
MM&A completed a Limited Phase I Environmental Site
 
Assessment (
ESA
) on the
Buchanan property
 
in April 2016, and on the Logan County
 
and Greenbrier
Properties in May 2017 on behalf of Coronado.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
16
Criteria
JORC Code explanation
Commentary
applicable, the status of approvals for process residue
 
storage and waste
dumps should be reported.
>
 
MM&A identified one REC at Greenbrier associated
 
with stained soil and gravel
near a fueling and maintenance area.
 
Coronado reported to MM&A that satisfactory
clean-up efforts were completed at Greenbrier.
>
 
Based on these former ESAs completed by MM&A,
 
it is MM&A’s opinion that
Coronado has a generally typical coal industry
 
record of compliance with applicable
mining, water quality, and environmental laws.
 
Estimated costs for mine closure,
including water quality monitoring during site reclamation,
 
are included in the TRS
financial models.
Infrastructure
 
>
 
The
 
existence
 
of
 
appropriate
 
infrastructure:
 
availability
 
of
 
land
 
for
 
plant
development, power,
 
water,
 
transportation (particularly
 
for bulk
 
commodities),
labour,
 
accommodation;
 
or
 
the
 
ease
 
with
 
which
 
the
 
infrastructure
 
can
 
be
provided or accessed.
>
 
Coronado currently operates one surface mine (Toney Fork Mine at the Logan Mine
Complex); Coronado also controls the idle Midland
 
Surface Mine at the Greenbrier
Mine Complex.
 
>
 
Coronado operates five underground mines as follows:
 
Buchanan Mine at the
Buchanan Mine Complex; Powellton #1, Eagle No. 1,
 
Muddy Bridge and Lower War
Eagle Mines in the Logan Mine Complex; the Mountaineer
 
#1 Mine at the
Greenbrier Mine Complex is currently idle.
>
 
All ROM production is currently planned for either
 
truck transportation from the
mines to the processing or shipping facilities, or
 
in some cases there is either a
current or planned mine mouth preparation plant and
 
barge/rail loading facility.
 
>
 
There is a network of public highways that provide
 
serviceable coal haul routes and
private, internal roads on the Properties would
 
be developed as may be needed.
 
Rail service to the Properties is most readily
 
provided by NS and CSX
with
connections to both domestic consumers and international
 
trans-shipment points.
 
NS track is located across the Monongahela
 
River from the proposed Pangburn
Hollow load-out facility.
 
Coal would be shipped to customers via barge
 
and rail and
sold as both metallurgical and thermal products.
 
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
17
Criteria
JORC Code explanation
Commentary
Costs
 
>
 
The derivation of, or assumptions made, regarding
 
projected capital costs in
the study.
>
 
The methodology used to estimate operating costs.
>
 
Coronado provided historical and 5-year budget operating
 
costs for its active mines
for MM&A’s review.
 
MM&A used the historical and/or budget cost
 
information as a
reference and developed personnel schedules for
 
each mine.
 
Hourly labor rates
and salaries were based upon information contained
 
in Coronado’s financial
summaries.
 
Fringe benefit costs were developed for vacation
 
and holidays, federal
and state unemployment insurance, retirement, workers’
 
compensation and
pneumoconiosis, casualty and life insurance, healthcare
 
and bonuses.
 
A cost factor
for mine supplies was developed that relates expenditures
 
to mine advance rates for
roof control costs and other mine supply costs at
 
underground mines.
 
Other factors
were developed for maintenance and repair costs,
 
rentals, mine power, outside
services and other direct mining costs
>
 
Surface mine direct operating costs were developed
 
as a function of overburden
ratio for repair and maintenance supplies, diesel
 
fuel, explosives and blasting, and
miscellaneous supplies and services.
 
Operating costs for highwall mines are based
on costs per ROM tonne estimates.
 
Other cost factors were developed for
 
coal
preparation plant processing, refuse handling,
 
coal loading, trucking, property taxes,
and insurance and bonding.
 
Appropriate royalty rates were assigned for production
from leased coal lands and sales taxes were calculated
 
for state severance taxes,
the federal black lung excise tax, and federal and
 
state reclamation fees.
>
 
Capital schedules were developed by MM&A for mine
 
development, infrastructure,
and on-going capital requirements for the life of
 
each projected mine.
>
 
Staffing levels were prepared and operating costs estimated
 
by MM&A for each
projected mine.
 
MM&A utilized historical cost data provided by Coronado
 
and its
own knowledge and experience to estimate direct
 
and indirect operating costs.
 
>
 
Allowances made for the content of deleterious elements.
>
 
No allowances have been made for deleterious
 
elements; no impact to quality from
deleterious elements is anticipated.
>
 
The derivation of assumptions made of metal or commodity
 
price(s), for the
principal minerals and co- products.
>
 
Coronado provided MM&A with price forecasts for all
 
Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
>
 
Derivation of transportation charges.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
18
Criteria
JORC Code explanation
Commentary
>
 
The basis for forecasting or source of treatment and
 
refining charges, penalties
for failure to meet specification, etc.
>
 
MM&A utilized historical cost data provided by
 
Coronado and its own knowledge
and experience to estimate direct and indirect operating
 
costs.
 
All ROM production
is currently planned for either truck transportation from
 
the mines to the processing
or shipping facilities, or in some cases there is either
 
a current or planned mine
mouth preparation plant and barge/rail loading facility.
>
 
The allowances made for royalties payable, both
 
Government and private.
>
 
Appropriate royalty rates were assigned for production
 
from leased coal lands and
sales taxes were calculated for state severance taxes,
 
the federal black lung excise
tax, and federal and state reclamation fees.
Revenue factors
 
>
 
The derivation of, or assumptions made regarding
 
revenue factors including
head grade, metal or commodity price(s) exchange
 
rates, transportation and
treatment charges, penalties, net smelter returns, etc.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward estimates
 
based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
>
 
The derivation of assumptions made of metal or commodity
 
price(s), for the
principal metals, minerals and co-products.
>
 
Coal sales prices as defined above.
 
All reported reserves are on a marketable
basis.
Market assessment
 
>
 
The demand, supply and stock situation for the particular
 
commodity,
consumption trends and factors likely to affect supply and
 
demand into the
future.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
>
 
A customer and competitor analysis along with the identification
 
of likely market
windows for the product.
>
 
All of the mine production serves metallurgical and thermal
 
markets.
 
The
metallurgical coal is marketed as high-volatile (typically
 
28 percent or greater volatile
matter content); mid-volatile (typically 23- to 27-percent
 
volatile matter content) and
low-volatile (typically less than 23 percent volatile
 
matter content) products.
>
 
Raw ROM production that requires washing is
 
currently processed through
Coronado owned and operated coal preparation
 
plants.
 
>
 
ROM coal that does not require further processing
 
is delivered directly to the loading
points for sizing and delivery to customers.
 
Coronado has access to two rail-loading
points serviced by the
Norfolk Southern Corporation (
NS
)
 
and two rail-loading
points serviced by
CSX Corporation (
CSX
)
.
>
 
Price and volume forecasts and the basis for these
 
forecasts.
>
 
Carlson Mining 2020
®
 
was used by MM&A to generate mine
 
plans for underground-
and surface-mineable coal seams.
 
Underground mine plans were sequenced
based on productivity schedules provided by Coronado,
 
which were based on
historically achieved productivity levels.
 
Surface mine plans were generated under
productivity assumptions (bank cubic yard per shift) as
 
provided by Coronado and
reviewed by MM&A, again based heavily on productivity
 
levels achieved by
Coronado.
 
All production forecasting ties assumed production
 
rates to geological
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
19
Criteria
JORC Code explanation
Commentary
models as constructed independently by MM&A’s team of geologists and mining
engineers.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
Economic
 
>
 
The inputs to the economic analysis to produce the
 
net present value (NPV) in
the study, the source and confidence of these economic inputs including
estimated inflation, discount rate, etc.
>
 
On an unlevered basis, the NPV of the project
 
cash flows after taxes was estimated
for the purpose of classifying coal reserves.
 
The project cash flows, excluding debt
service, are calculated by subtracting direct and indirect
 
operating expenses and
capital expenditures from revenue.
 
Direct costs include labor, drilling and blasting,
operating supplies, maintenance and repairs, facilities costs
 
for materials handling,
coal preparation, refuse disposal, coal loading, sampling
 
and analysis services,
reclamation and general and administrative costs.
 
Indirect costs include statutory
and legally agreed upon fees related to direct
 
extraction of the mineral.
 
The indirect
costs are the Federal black lung tax, Federal
 
and State reclamation taxes, property
taxes, local transportation prior to delivery at
 
rail or barge loading sites, coal
production royalties, sales and use taxes, income
 
taxes and State severance taxes.
Coronado’s historical costs provided a useful reference
 
for MM&A’s cost estimates.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
>
 
All costs and prices are based on 2021 nominal United
 
States dollars.
>
 
A pre-feasibility LOM plan was prepared
 
by MM&A for active and proposed mines.
 
MM&A prepared mine projections and production timing
 
forecasts based on coal
seam characteristics.
 
Production timing was carried out from 2022
 
to depletion
(exhaustion) of the coal reserve areas, which is projected
 
for the year 2099.
>
 
The all-mines average cash cost ranges between approximately
 
$56 and $311 per
tonne for most of the operating period.
>
 
NPV ranges and sensitivity to variations in the
 
significant assumptions and
inputs.
>
 
An estimate of NPV at a base discount rate of
 
10.0% was included in Section 19 of
the TRS.
>
 
NPV of the Buchanan, Russell, Mon Valley, Logan and Greenbrier Properties was
estimated to be $1.580 billion, $89.7 million, $287.3
 
million, $611.3 million and
$66.0 million, respectively.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
20
Criteria
JORC Code explanation
Commentary
>
 
The sensitivity study shows the NPV at the 10.0%
 
discount rate when Base Case
sales prices, operating costs, and capital costs are
 
increased and decreased in
increments of 5% within a +/- 15% range.
 
Social
 
>
 
The status of agreements with key stakeholders
 
and matters leading to social
license to operate.
>
 
Portions of the properties are located near
 
local communities.
 
Regulations prohibit
mining activities within 91 meters of a residential
 
dwelling, school, church, or similar
structure unless written consent is first obtained from
 
the owner of the structure.
 
Where required, such consents have been obtained
 
where mining is proposed
beyond the regulatory limits.
Other
 
To the extent relevant, the impact of the following on the project and/or on the
estimation and classification of the Ore Reserves:
>
 
Any identified material naturally occurring risks.
>
 
No material naturally occurring risks have been identified.
>
 
The status of material legal agreements and
 
marketing arrangements.
>
 
The Coronado coal resources are located in Buchanan,
 
Russell and Tazewell
Counties, Virginia; Greenbrier, Logan, Boone, Wyoming and Greenbrier Counties,
West Virginia; Allegheny, Washington and Westmoreland Counties, Pennsylvania.
>
 
MM&A has not carried out separate title verification for
 
the coal properties and has
not verified leases, deeds, surveys or other property
 
control instruments pertinent to
the subject resources.
>
 
Coronado has represented to MM&A that it controls the
 
mining rights to the reserves
as shown on its property maps, and MM&A
 
has accepted these as being a true and
accurate depiction of the mineral rights controlled
 
by Coronado.
 
The TRS assumes
the properties are developed under responsible and
 
experienced management.
>
 
The status of government agreements and approvals
 
critical to the viability of
the project, such as mineral tenement status and
 
government and statutory
approvals. There must be reasonable grounds
 
to expect that all necessary
Government approvals will be received within the
 
timeframes anticipated in the
Pre-Feasibility or Feasibility study. Highlight and discuss the materiality of any
unresolved matter that is dependent on a third part
 
on which extraction of the
reserve is contingent.
>
 
Coronado has obtained all mining and discharge permits
 
to operate 34 underground
mines, 13 surface mines, and 18 processing, loadout
 
or related facilities.
 
MM&A is
unaware of any obvious or current Coronado
 
permitting issues that are expected to
prevent the issuance of future permits.
 
Coronado, along with all Central and
Northern Appalachian basin coal producers, is
 
subject to a level of uncertainty
regarding future clean water permits due to
United States Environmental
Protection Agency
(
EPA
)
 
involvement with state programs.
Classification
 
>
 
The basis for the classification of the Ore Reserves
 
into varying confidence
categories. Whether the result appropriately reflects
 
the Competent Person’s
view of the deposit. The proportion of Probable
 
Ore Reserves that have been
derived from Measured Mineral Resources (if
 
any).
>
 
Measured and indicated resources have been
 
converted to proved and probable
reserves, respectively.
>
 
None of the probable coal reserves have been
 
derived from measured resources.
>
 
In a limited number of cases where there was
 
only very limited data available to
demonstrate the metallurgical suitability of a given
 
coal deposit, that deposit was
classified as a probable reserve instead of a
 
proved reserve.
>
 
The results of this TRS define an estimated total
 
initial ROM recoverable ore (coal)
reserve estimate of 556 million tonnes for Coronado
 
as follows:
a)
 
Buchanan =
 
160 Mt
b)
 
Logan
 
=
 
137 Mt
c)
 
Greenbrier=
 
12 Mt
d)
 
Russell =
 
50 Mt
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
21
Criteria
JORC Code explanation
Commentary
e)
 
Mon Valley =
 
197 Mt
 
>
 
Coronado controls a total of 342 Mt (moist basis)
 
of marketable coal reserves for
Coronado as of December 31, 2021.
 
Of that total, 72 percent are proved, and
 
28
percent are probable.
 
Total reserves by complex are as follows:
a)
 
Buchanan =
 
98 Mt
b)
 
Logan
 
=
 
73 Mt
c)
 
Greenbrier=
 
7 Mt
d)
 
Russell =
 
30 Mt
e)
 
Mon Valley =
 
134 Mt
 
Audits or reviews
>
 
The results of any audits or reviews of Ore
 
Reserve estimates.
>
 
MM&A completed prepared a statement of coal resources
 
and reserves for the
Properties in accordance with the JORC Code
 
as of December 31, 2017.
 
MM&A
also subsequently updated the estimate of resources
 
and reserves for depletion as
of December 31, 2018, December 31, 2019, and
 
December 31, 2020.
>
 
MM&A performed a previous audit of the Properties
 
in year 2017 for Coronado
based on
U.S. Securities and Exchange Commission (
SEC
)
 
Industry Guide 7
standards.
 
Earlier audits were performed by various
 
independent consultants for
predecessors-in-title to Coronado and at various
 
levels of detail depending on the
clients concerns and the allotted time for completion.
 
Previous audits and reviews
defined the primary coal resource areas and estimated
 
the recoverable tonnes for
each seam based on the expected mining methods.
>
 
Additionally, MM&A has performed proprietary evaluations for predecessors-in-title
to Coronado, which encompass portions of the Properties
 
included in this TRS.
Discussion of
relative accuracy/
confidence
 
>
 
Where appropriate a statement of the relative accuracy
 
and confidence level in
the Ore Reserve estimate using an approach
 
or procedure deemed appropriate
by the Competent Person. For example, the application
 
of statistical or
geostatistical procedures to quantify the relative accuracy
 
of the reserve within
stated confidence limits, or, if such an approach is not deemed
 
appropriate, a
qualitative discussion of the factors which could affect the relative
 
accuracy
and confidence of the estimate.
>
 
Operations on the Properties by Coronado and
 
its predecessors have been on-
going for many years.
 
>
 
MM&A is confident that the mine plans and
 
financial models are reasonably
representative to provide an accurate estimation of
 
coal reserves.
>
 
Mine development and operation have not been optimized
 
within the TRS.
>
 
The statement should specify whether it relates
 
to global or local estimates,
and, if local, state the relevant tonnages, which
 
should be relevant to technical
and economic evaluation. Documentation should include
 
assumptions made
and the procedures used.
>
 
Proved and probable coal reserve were derived
 
from the defined in-situ coal
resource considering relevant processing, economic (including
 
independent
estimates of capital, revenue and cost), marketing, legal,
 
environmental,
socioeconomic, and regulatory factors on a global
 
scale as current local data
reflects the global assumptions.
>
 
Accuracy and confidence discussions should extend to
 
specific discussions of
any applied Modifying Factors that may have
 
a material impact on Ore Reserve
viability, or for which there are remaining areas of uncertainty at the current
study stage.
The major risk factors for the active Coronado
 
mines and future resource development
are summarized below:
>
 
Mine Accidents
>
 
Highwall Failure.
 
Highwall failures are likely to result in
 
a temporary mine closure
and should not have a material impact on the
 
mine sustainability.
 
The risk is
considered to be probable.
 
>
 
Adverse Geological Conditions.
 
Adverse geological conditions include such
conditions as faults and sandstone washes.
 
The risk is considered to be probable.
 
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
22
Criteria
JORC Code explanation
Commentary
The impact is expected to be temporary with
 
little material impact on mine
sustainability.
>
 
Environmental Risk.
 
Numerous federal and state permits are required
 
to operate
coal mines and mine surface facilities. Permitting rules
 
are complex and may
change over time, making compliance difficult or impossible.
>
 
Water Quality.
 
Permit requirements to fulfill Clean Water Act obligations are
 
subject
to modification.
 
The probability of water quality changes having
 
a material impact
on mine operations is possible.
 
As a contemporary example, the selenium
discharge issue that affects western Canadian and Central Appalachian
 
Basin
operators has only recently emerged as a concern
 
and its ultimate impact has not
been determined.
>
 
New Permits.
 
Permit protests by environmental groups and
 
individuals can
contribute to permit delays or denial and increase
 
the cost of permitting and delay
development.
 
Surface mining activities, coal refuse disposal and
 
construction of
access roads in mountainous terrain often require
 
storage of material in valley fills.
 
Authority to dispose of fill material into waters of
 
the United States must be granted
by the
United States Army Corps of Engineers
 
(
COE
)
.
 
COE permits are
increasingly difficult to obtain.
>
 
Regulatory Requirements.
 
Adverse impact from regulatory changes is
 
considered
to be probable.
 
The impact will likely affect the broader industry
 
and is not expected
to result in mine closure.
>
 
Market Risk.
 
Metallurgical and thermal coal markets ultimately depend
 
upon the
global steel and thermal coal demand and are
 
considered to be volatile.
 
Currently,
the US coal market has seen a decline
 
in demand for thermal coal due to thermal
plant closures, as a result of new air and
 
water pollution regulations, and
competition from other commodities used for power
 
generation such as natural gas.
 
This has resulted in an overall decline in CAPP
 
coal production.
 
Continued
regulatory changes and declining demand could result
 
in material changes in
domestic and global coal markets.
 
The impact cannot be predicted at this time;
however, while MM&A expects the coal reserve within this TRS to
 
remain
economically viable throughout the life of the projected
 
mines, the LOM financial
model is very sensitive to changes in coal sales
 
price and therefore market risk is
not insignificant.
>
 
Labor Risk.
 
Work stoppage due to organized labor protests
 
is considered to be
unlikely and not likely to lead to permanent mine
 
closure.
 
The mines are likely to
suffer the loss of key supervisors and skilled employees
 
due to retirement as the
workforce ages.
 
The problem is industry-wide and the impact
 
is expected to be
temporary and have no sustained impact on
 
coal production.
>
 
Availability of Equipment and Supplies.
 
Risk of equipment and supply availability is
likely to be temporary and should not have a sustained
 
adverse impact on the
production of coal.
 
 
ex963p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of
 
December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
23
Criteria
JORC Code explanation
Commentary
>
 
Transportation Delay.
 
Interruption of coal transport services by river
 
or rail is
considered to be probable but unlikely to have a
 
sustained impact on coal
production.
>
 
It is recognised that this may not be possible or appropriate
 
in all
circumstances. These statements of relative accuracy and
 
confidence of the
estimate should be compared with production data,
 
where available.
>
 
Mine plans, productivity expectations and cost estimates
 
generally reflect historical
performance and efforts have been made to adjust plans
 
and costs to reflect future
conditions.
ex964p1i0.jpg
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2021
Northern Appalachian Coal Basin
Pennsylvania, USA
February 2022
Prepared for:
Coronado Global Resources Inc.
 
100 Bill Baker Way
 
Beckley, West
 
Virginia 25801
Prepared by:
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
582 Industrial Park Road
Bluefield, Virginia
 
24605
www.mma1.com
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
Statement of Use and Preparation
This Technical
 
Report Summary (
TRS
) was prepared by
Marshall Miller & Associates, Inc. (
MM&A
)
for
 
the
 
sole
 
use
 
of
Coronado
 
Global
 
Resources
 
Inc.
 
(
Coronado
)
and
 
its
 
affiliated
 
and
 
subsidiary
companies and advisors.
 
Copies or
 
references to information in this
 
report may not
 
be used
 
without
the written permission of Coronado.
This report provides a
 
statement of coal resources and
 
coal reserves for Coronado, as
 
defined under
the
Australasian Code
 
for Reporting
 
of Exploration Results,
 
Mineral Resources
 
and Ore
 
Reserves
(
JORC Code
) as well as under Subpart 1300 of Regulation S-K (Regulation S-K 1300) promulgated by
the
United States
 
Securities and
 
Exchange Commission
 
(
SEC
)
.
 
Subject to
 
the comments
 
below,
 
this
report
 
was
 
also
 
prepared
 
in
 
accordance
 
with
 
the
Australasian
 
Code
 
for
 
Public
 
Reporting
 
of
Technical
 
Assessments and Valuations of Mineral Assets
(
VALMIN Code
).
 
The statement is based on
 
information provided by Coronado and
 
reviewed by Scott Peterson, CPG;
and Justin S. Douthat, PE, MBA.
As noted above, this report is a “Public Report” for the purposes of the VALMIN Code.
 
However,
 
in
accordance with paragraph 12.1 of the VALMIN Code, it is noted that this report is not a “Valuation
of
 
Mineral
 
Assets
”,
and
 
it
 
also
 
does
 
not
 
comply
 
with
 
the
 
following
 
requirements
 
that
 
apply
 
to
“Technical Assessments” (as defined in the VALMIN
 
Code):
This report does not include a determination of the status of tenure (as required
 
by paragraph
7.2 of the VALMIN Code) on the basis that tenure was separately
 
reviewed by Coronado’s
 
legal
advisors.
This
 
report
 
does
 
not
 
include
 
separate
 
commentary
 
on
 
the
 
reasonableness
 
and
 
quality
 
of
 
the
Resources and Reserves estimates
 
and the basis on which they have been reported (as required
 
by
paragraph
 
7.3
 
of
 
the
 
VALMIN
 
Code).
 
MM&A
 
did
 
not
 
consider
 
that
 
this
 
was
 
appropriate
 
in
circumstances
 
where
 
MM&A
 
was
 
engaged
 
for
 
the
 
specific
 
purpose
 
of
 
preparing
 
those
 
estimates
and
 
the
 
Resource
 
estimates
 
were
 
prepared
 
by
 
Scott
 
Peterson
 
and
 
the
 
Reserve
 
estimates
 
were
prepared by Justin Douthat, both of whom are authors of this report.
 
However,
 
MM&A notes that,
in accordance with
 
its usual
 
practice, a separate
 
team of
 
MM&A employees
 
undertook a
 
peer review
of this
 
report and
 
confirmed that
 
both the
 
process followed
 
by the
 
authors of
 
this report
 
and the
estimates prepared were reasonable and comply with the requirements
 
of the JORC Code.
 
Justin Douthat is a
 
licensed Professional Engineers and Registered Member of
 
the
Society of Mining
Engineers (
SME
)
, Golden, Colorado,
 
USA.
 
Scott Peterson
 
is a Registered
 
Member of the
American
Institute
 
of
 
Professional
 
Geologists
(
AIPG
)
.
 
SME
 
and
 
AIPG
 
are
Recognized
 
Professional
Organizations
 
(
RPOs
)
.
 
Both
 
are
 
full-time
 
employees
 
of
 
Marshall
 
Miller
 
&
 
Associates,
 
Inc.
 
and
recognized as a
Qualified Persons
(
QPs
).
The information in this TRS
 
related to coal resources and reserves is
 
based on, and fairly represents,
information compiled by the QPs.
 
At the time of
 
reporting, MM&A’s QPs have sufficient experience
relevant
 
to the
 
style of
 
mineralization
 
and type
 
of deposit
 
under consideration
 
and to
 
the activity
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
they are undertaking to qualify as a
 
QP as defined by the
 
SEC and the JORC Code.
 
Each QP consents
to the inclusion in
 
this report of the
 
matters based
 
on their information
 
in the form and
 
context in
which it appears.
Marshall
 
Miller
 
&
 
Associates,
 
Inc.
 
(
MM&A
)
 
hereby
 
consents
 
to
 
the
 
use
 
of
 
the
 
information
contained in this report
 
dated December 31, 2021, relating
 
to estimates of
 
coal resources and coal
reserves controlled by Coronado.
 
 
 
ex964p2i0.jpg
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
This report was prepared by:
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
/s/ Scott Peterson
February 18, 2022
Scott Peterson, CPG
Sr.
 
Principal Geologist
Direct Line: +1 304 809 0630
 
Email:
 
scott.peterson@mma1.com
 
Date of Signature
/s/ Justin S. Douthat
February 18, 2022
Justin S. Douthat, PE, MBA
Executive Vice President
Direct Line: +1 304 809 0597
Email:
 
justin.douthat@mma1.com
Date of Signature
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
Table of
 
Contents
1
1
1.1
1
1.2
2
1.3
2
1.4
2
1.5
3
1.6
3
1.7
3
1.8
4
1.9
5
1.10
6
1.10.1
10
1.10.2
10
1.11
11
1.12
11
2
11
2.1
11
2.2
12
2.3
12
3
12
3.1
12
3.2
13
3.3
13
3.4
14
3.5
14
4
14
4.1
14
4.2
14
4.3
14
4.4
15
4.5
15
5
15
5.1
15
5.2
15
6
16
6.1
16
6.2
17
6.3
18
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
7
19
7.1
19
7.2
20
7.3
20
7.4
21
7.5
21
8
22
8.1
22
8.2
22
9
23
9.1
23
9.2
23
9.3
23
10
23
10.1
23
10.2
24
10.3
24
10.4
24
11
24
11.1
25
11.1.1
26
11.2
29
11.3
30
12
30
12.1
30
12.2
32
12.3
33
13
33
13.1
33
13.2
34
13.3
35
13.4
36
13.4.1
36
13.4.2
38
13.4.3
39
14
40
14.1
40
14.2
40
15
41
16
41
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport
 
Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
16.1
41
16.2
42
16.3
42
17
43
17.1
43
17.2
43
17.3
43
17.4
44
17.5
44
17.6
44
18
45
18.1
45
18.2
45
19
47
19.1
47
19.2
49
19.3
53
20
54
20.1
54
21
54
22
55
22.1
55
22.2
55
22.2.1
56
22.2.2
56
22.2.3
56
22.2.4
57
22.2.5
60
22.2.6
60
22.2.7
61
22.2.8
61
23
67
24
67
25
68
Figures (in Report)
2
5
6
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
10
18
20
27
27
28
29
38
45
49
54
Tables
 
(in Report)
3
4
4
7
7
26
29
30
32
32
35
42
47
47
50
51
7
58
59
60
61
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
62
63
63
64
64
65
66
66
67
67
68
Appendices
A
Biographies
 
B
Maps
 
C
Glossary of Te
 
rms
 
D
JORC Table
 
1
 
 
 
ex964p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
1
Executive Summary
1.1
 
Property Description
Coronado Global Resources Inc. (
Coronado
)
authorized
Marshall Miller & Associates,
Inc.
 
(
MM&A
)
to
 
prepare
 
this
 
Technical
 
Report
 
Summary
 
(
TRS
)
 
of
 
its
 
controlled
 
coal
resources
 
and
 
reserves
 
for
 
the
 
Mon
 
Valley
 
Complex
 
in
 
southwestern
 
Pennsylvania
 
(Mon
Valley or the
Property
).
 
The report
 
provides a
 
statement of
 
coal resources
 
and coal
 
reserves
for
 
Coronado,
 
as
 
defined
 
under
 
the
Australasian
 
Code
 
for
 
Reporting
 
of
 
Exploration
Results, Mineral
 
Resources and Ore
 
Reserves
(
JORC Code
) as
 
well as
 
under Subpart
1300
 
of
 
Regulation
 
S-K
 
(Regulation
 
S-K
 
1300)
 
promulgated
 
by
 
the
United
 
States
Securities
 
and
 
Exchange
 
Commission
 
(
SEC
)
.
 
This
 
report
 
was
 
also
 
prepared
 
in
accordance with
 
the
Australasian Code
 
for Public
 
Reporting of
 
Technical Assessments
and Valuations of Mineral Assets
(
VALMIN Code
).
The
 
Mon
 
Valley
 
property
 
is
 
comprised
 
of
 
three
 
separate
 
reserve
 
holdings,
 
namely,
 
the
Pangburn,
 
Shaner
 
and
 
Fallowfield
 
proposed
 
underground
 
mines
 
in
 
the
 
Upper
 
Freeport
seam.
 
All three
 
respective reserve
 
areas are
 
greenfield sites
 
and are
 
undeveloped.
 
The
three
 
mines
 
have
 
been
 
projected
 
to
 
operate
 
independently,
 
with
 
production
 
initially
beginning at Pangburn.
 
Shaner is projected
 
to come online as
 
replacement production for
Pangburn, and Fallowfield represents expanded
 
Mon Valley production after Pangburn is in
full production.
 
In addition
 
to the
 
individual mine/plant
 
sites, a
 
barge loading
 
dock on
 
the
Monongahela River adjacent
 
to the Pangburn
 
site is proposed
 
and will be
 
used to ship
 
clean
coal
 
for
 
all
 
three
 
mines.
 
Each
 
mine
 
site
 
will
 
include
 
a
 
coal
 
preparation
 
plant
 
and
 
all
necessary surface facilities.
Coal resources
 
and coal reserves
 
are herein reported
 
in metric
 
units of
 
measurement and
are rounded to millions of metric tonnes (
Mt
).
 
The
 
Mon
 
Valley
 
properties
 
are
 
located
 
approximately
 
16
 
kilometers
 
to
 
32
 
kilometers
southeast of
 
Pittsburgh, Pennsylvania
 
(see
Figure 1-1
).
 
The property
 
is composed
 
of 41,615
total
 
hectares,
 
of which
 
1,339
 
are
 
leased
 
from private
 
landholders under
 
two
 
leases,
 
and
40,276
 
hectares
 
are
 
owned
 
by
 
Coronado.
 
Subject
 
to
 
Coronado’s
 
exercising
 
its
 
renewal
rights thereunder,
 
both of the
 
leases expire upon exhaustion
 
of the relevant
 
coal reserves,
which is expected to occur in 2099.
 
 
ex964p2i0.jpg ex964p11i1.jpg
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Figure 1-1:
 
Mon Valley Complex Property Location Map
1.2
 
Ownership
Mineral rights
 
for the Property
 
were formerly controlled
 
by
Consolidation Coal Company
(
CONSOL
)
.
 
Coronado acquired the Mon Valley properties from CONSOL in March 2016.
1.3
 
Geology
There
 
are
 
currently
 
no active
 
operations
 
in
 
the
 
Mon
 
Valley
 
complex.
 
Strata
 
of
 
economic
interest
 
for
 
this
 
TRS
 
are
 
of
 
the
 
Pennsylvanian-age
 
Allegheny
 
Formation,
 
and
 
the
 
subject
Upper
 
Freeport
 
seam
 
is
 
the
 
principal
 
coal
 
seam
 
of
 
interest
 
for
 
Coronado.
 
The
 
Upper
Freeport
 
seam
 
has
 
been
 
mined
 
extensively
 
in
 
the
 
region.
 
The
 
seam
 
is
 
situated
 
below
drainage
 
throughout
 
the
 
Property
 
and
 
will
 
be
 
accessed
 
by
 
constructed
 
mine
 
shafts
 
and
slopes.
1.4
 
Exploration Status
The
 
Property
 
has
 
been
 
explored
 
extensively,
 
largely
 
by
 
drilling
 
using
 
continuous
 
coring
method, rotary
 
drilling, and
 
by downhole
 
geophysical methods.
 
The majority
 
of the
 
data was
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
acquired
 
or
 
generated
 
by
 
previous
 
owners
 
of
 
the
 
Property.
 
These sources
 
comprise
 
the
primary data used
 
in the
 
evaluation of the
 
coal resources and
 
coal reserves
 
on the Property.
 
MM&A
 
examined
 
the
 
data
 
available
 
for
 
the
 
evaluation
 
and
 
incorporated
 
all
 
pertinent
information into
 
this TRS.
 
Where data
 
appeared to
 
be anomalous
 
or not
 
representative, that
information was excluded from
 
the digital databases and
 
subsequent processing by MM&A.
 
Ongoing
 
exploration
 
has
 
been
 
carried
 
out
 
by
 
Coronado
 
since
 
acquiring
 
the
 
Mon
 
Valley
properties.
 
1.5
 
Operations and Development
Coronado
 
currently
 
has
 
no
 
active
 
operations
 
in
 
the
 
Mon
 
Valley
 
complex.
 
The
 
mines
 
will
produce coal that is suitable for the high-volatile metallurgical coal markets.
The preliminary design for the Pangburn mine surface facilities was provided by Coronado.
 
The facilities include offices, warehouses,
 
shops, a bathhouse for personnel, a preparation
plant
 
to
 
process
 
run-of-mine
 
(
ROM
)
 
coal,
 
a
 
refuse
 
area
 
with
 
a
 
designed
 
capacity
 
of
approximately 35 million refuse tonnes, raw coal storage at the plant totaling approximately
100,000
 
tonnes, clean
 
coal
 
storage at
 
the plant
 
site of
 
approximately 54,000
 
tonnes, and
three clean coal stockpiles
 
adjacent to the dock
 
loading facility on the
 
Monongahela River.
 
The
 
three
 
river
 
stockpiles
 
have
 
a
 
designed
 
capacity
 
of
 
approximately
 
266,000
 
tonnes.
 
Processes are expected to be typical
 
of those used at operating coal-processing
 
plants and
the coal
 
industry in
 
general.
 
The river
 
dock is
 
anticipated to
 
also support
 
production from
the planned
 
Fallowfield and
 
Shaner operations.
 
Room-and-pillar mining
 
will be
 
employed
at these properties.
1.6
 
Mineral Resource
Mineral resources, representing
 
in-situ coal in
 
which a portion
 
of reserves are
 
derived, are
presented below.
 
A coal resource estimate,
 
summarized in
Table
 
1-1
, was prepared as
 
of
December 31, 2021, for property controlled by Coronado.
Table 1-1:
 
Coal Resources Summary as of December 31, 2021
 
Coal Resource (Dry Tonnes, In Situ, Mt)
Resource Quality (Dry)
Area
Measured
Indicated
Inferred
Total
Ash%
Sulfur%
VM%
Inclusive of Reserve
291.0
213.5
9.3
513.8
31
1.4
26
Exclusive of Reserve
0.0
0.0
0.0
0.0
Total 12/31/2021
291.0
213.5
9.3
513.8
Note:
 
Resource tonnes are inclusive of reserve
 
tonnes since they include the in-situ tonnes from
 
which recoverable coal reserves
are derived.
Note 2:
 
Coal resources are reported on a dry basis.
 
Surface moisture and inherent moisture are excluded.
Note 3: The Mon Valley properties do not have any resource
 
tonnes exclusive of reserves as of December
 
31, 2021.
1.7
 
Mineral Reserve
Reserve
 
tonnage
 
estimates
 
provided
 
herein
 
report
 
coal
 
reserves
 
derived
 
from
 
the
 
in-situ
resource tonnes presented in
Table
 
1-1
, and not in addition to coal resources.
 
Proven and
probable
 
coal
 
reserves
 
were
 
derived
 
from
 
the
 
defined
 
coal
 
resource
 
considering
 
relevant
mining,
 
processing,
 
infrastructure, economic
 
(including
 
estimates of
 
capital,
 
revenue, and
cost),
 
marketing,
 
legal,
 
environmental,
 
socio-economic
 
and
 
regulatory
 
factors.
 
The
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Resource estimate has been used as
 
the basis for this Reserve calculation,
 
which utilizes a
reasonable
 
Preliminary
 
Feasibility
 
Study,
 
a
 
Life-of
 
Mine
 
(
LOM
)
 
Mine
 
Plan
 
and
 
practical
recovery factors.
 
Production modeling was completed with an effective start
 
date of May 1,
2031.
 
Factors that would
 
typically preclude conversion
 
of a coal
 
resource to coal
 
reserve include
the following: inferred
 
resource classification; absence
 
of coal quality;
 
poor mine recovery;
lack of
 
access; geological
 
encumbrances associated
 
with overlying
 
and underlying
 
strata;
seam thinning;
 
structural complication;
 
and insufficient
 
exploration have
 
all been
 
considered.
 
Reserve
 
consideration
 
excludes
 
those
 
portions
 
of
 
the
 
resource
 
area
 
which
 
exhibit
 
the
aforementioned geological and operational encumbrances.
 
Table 1-2:
 
Coal Summary (ROM Basis (Moist)) as of December
 
31, 2021 (Mt)
 
Demonstrated Coal Reserves (Mt, Moist ROM)
 
 
 
 
By Reliability Category
By Mining Type
By Control Type
Quality (Dry)
Area /
Mine
Proved
Probable
Total
Surface
UG
Owned
Leased
Ash
Sulfur
Vol
Mon Valley
113.9
83.2
197.1
0.0
197.1
195.7
1.4
37
1.2
23
Coal
 
reserves
 
are
 
presented
 
on
 
a
 
ROM
 
basis
 
in
Table
 
1-2
.
 
Proven
 
and
 
probable
 
coal
reserves
 
were
 
derived
 
from
 
the
 
defined
 
in-situ
 
coal
 
resource
 
considering
 
relevant
processing,
 
economic
 
(including
 
technical
 
estimates
 
of
 
capital,
 
revenue,
 
and
 
cost),
marketing,
 
legal,
 
environmental,
 
socioeconomic,
 
and
 
regulatory
 
factors.
 
The
 
proven
 
and
probable coal reserves on the Property are summarized below in
Table
 
1-3
.
Table 1-3:
 
Coal Reserves Summary (Marketable Sales Basis) as of December
 
31, 2021 (Mt)
 
Demonstrated Coal Reserves (Wet Tons, Washed or Direct Shipped, Mt)
Quality (Dry Basis)
 
By Reliability Category
By Mining Type
By Control Type
Property
Proven
Probable
Total
Surface
UG
Owned
Leased
Ash%
Sulfur%
VM%
Mon Valley
77.8
56.6
134.4
0.0
134.4
133.4
1.0
8
1.2
35
 
Note: Marketable reserve tonnes are reported
 
on a moist basis, including a combination of
 
surface and inherent moisture.
 
The
combination of surface and inherent moisture is
 
modeled at 6-percent.
 
Actual product moisture is dependent upon
 
multiple
geological factors, operational factors, and product
 
contract specifications and can exceed 8-percent.
 
As such, the modeled
moisture values provide a level of conservatism
 
for reserve reporting.
 
Life-of-mine sulfur for Pangburn is an estimated 1.21%;
however, overall Mon Valley Complex reserve average is 1.36% sulfur.
In summary, Coronado controls
 
a total
 
of 134.4 Mt
 
(moist basis)
 
of marketable
 
coal reserves
at
 
Mon
 
Valley,
 
as
 
of
 
December
 
31,
 
2021.
 
Of
 
that
 
total,
 
58
 
percent
 
are
 
proven,
 
and
 
42
percent are probable.
 
There are 133.4 Mt
 
of owned coal reserves
 
and 1.0 Mt of
 
leased coal
reserves.
 
All of the
 
Mon Valley
 
reserves are considered
 
suitable for the
 
metallurgical coal
market.
 
All of the Mon Valley reserves are unassigned.
1.8
 
Capital Summary
The
 
MM&A
 
financial
 
model
 
includes
 
provisions
 
for
 
operating
 
equipment
 
at
 
the
 
proposed
Mon Valley
 
operations.
 
MM&A’s
 
capital schedules
 
assume that
 
major equipment
 
rebuilds
occur over
 
the course of
 
each machine’s
 
remaining assumed operating
 
life.
 
Replacement
equipment
 
was
 
scheduled
 
based
 
on
 
MM&A’s
 
experience
 
and
 
knowledge
 
of
 
mining
equipment
 
and
 
industry
 
standards
 
with
 
respect
 
to
 
the
 
useful
 
life
 
of
 
such
 
equipment.
 
A
summary of the estimated capital for the Property is provided in
Figure 1-2
 
below.
 
 
ex964p2i0.jpg ex964p14i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Figure 1-2:
 
CAPEX
1.9
 
Operating Costs
MM&A
 
used
 
the
 
Coronado
 
historical
 
and/or
 
budget
 
cost
 
information
 
for
 
comparable
operations
 
as
 
a
 
reference
 
and
 
developed
 
personnel
 
schedules
 
for
 
the
 
mine
 
and
 
support
facilities.
 
Hourly
 
labor
 
rates
 
and
 
salaries
 
were
 
based
 
upon
 
information
 
contained
 
in
Coronado’s
 
financial
 
summaries.
 
Fringe
 
benefit
 
costs
 
were
 
developed
 
for
 
vacation
 
and
holidays,
 
federal
 
and
 
state
 
unemployment
 
insurance,
 
retirement,
 
workers’
 
compensation
and pneumoconiosis,
 
casualty and
 
life insurance,
 
healthcare, and
 
bonuses.
 
A cost
 
factor
for mine
 
supplies was
 
developed that
 
relates expenditures
 
to mine
 
advance rates
 
for roof
control
 
costs
 
and
 
other
 
mine
 
supply
 
costs
 
at
 
underground
 
mines.
 
Other
 
factors
 
were
developed
 
for
 
maintenance
 
and
 
repair
 
costs,
 
rentals,
 
mine
 
power,
 
outside
 
services
 
and
other direct mining costs.
 
Operating-cost factors
 
were also
 
developed for
 
the coal
 
preparation plant
 
processing, refuse
handling, coal
 
loading, property
 
taxes, and
 
insurance and
 
bonding.
 
Appropriate royalty
 
rates
were assigned for
 
production from
 
leased coal
 
lands and sales
 
taxes were calculated
 
for the
federal black lung excise tax, and federal reclamation fees.
A summary of the projected operating costs for the Property is provided in
Figure 1-3
.
 
 
ex964p2i0.jpg ex964p15i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
Figure 1-3:
 
OPEX
1.10
 
Economic Evaluation
The pre-feasibility
 
financial model
 
prepared for
 
this TRS
 
was developed
 
to test
 
the economic
viability of each
 
coal resource area.
 
The results of this
 
financial model are
 
not intended to
represent a bankable feasibility study,
 
required for financing of any current or future mining
operations
 
contemplated
 
for
 
the
 
Coronado
 
properties,
 
but
 
are
 
intended
 
to
 
establish
 
the
economic viability
 
of the estimated
 
coal reserves.
 
Cash flows
 
are simulated
 
on an annual
basis in
 
nominal dollars
 
assuming a
 
2% inflation
 
rate based
 
on projected
 
production from
the
 
coal
 
reserves.
 
The
 
discounted
 
cash
 
flow
 
analysis
 
presented
 
herein
 
is
 
based
 
on
 
an
effective date of January 1, 2022.
 
On
 
an
 
un-levered
 
basis,
 
the
 
net
 
present
 
value
 
(
NPV
)
 
of
 
the
 
project
 
cash
 
flow
 
after
 
taxes
represents
 
the
 
Enterprise
 
Value
 
of
 
the
 
project.
 
The
 
project
 
cash
 
flow,
 
excluding
 
debt
service,
 
is
 
calculated
 
by
 
subtracting
 
direct
 
and
 
indirect
 
operating
 
expenses
 
and
 
capital
expenditures from
 
revenue.
 
Direct costs
 
include labor, operating
 
supplies, maintenance
 
and
repairs, facilities
 
costs for
 
materials handling,
 
coal preparation,
 
refuse disposal,
 
coal loading,
reclamation
 
and
 
general
 
and
 
administrative
 
costs.
 
Indirect
 
costs
 
include
 
statutory
 
and
legally agreed
 
upon fees
 
related to
 
direct extraction
 
of the
 
mineral.
 
The indirect
 
costs are
the
 
Federal
 
black
 
lung
 
tax,
 
Federal
 
reclamation
 
taxes,
 
property
 
taxes,
 
coal
 
production
royalties, and income taxes.
Table
 
1-4
 
shows
 
LOM
 
tonnage,
 
profit
 
&
 
loss
 
(
P&L
),
 
and
 
earnings
 
before
 
income
 
tax,
depreciation & amortization (
EBITDA
)
 
for each proposed Coronado mine at Mon Valley.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
Table 1-4:
 
Life-of-Mine Tonnage, P&L before Tax, and EBITDA ($000)
 
LOM
LOM
P&L
LOM
EBITDA
 
Tonnes
*
Pre-Tax
 
P&L
Per Tonne
EBITDA
Per Tonne
Pangburn
14,376
$701,483
$48.80
$1,259,113
$87.59
Fallowfield
72,640
$4,712,144
$64.87
$6,688,054
$92.07
Shaner
48,294
$4,656,184
$96.41
$5,641,238
$116.81
Consolidated PA Deep Mines
135,309
$10,069,811
$74.42
$13,588,405
$100.42
Note:
 
*Financial model includes 0.9
 
million tonnes of inferred
 
coal production.
 
Inferred coal represents
0.6% of the total production, and none of this coal was included in the estimate of reserves.
As
 
shown
 
in
Table
 
1-4,
 
all
 
of
 
the
 
mines
 
analyzed
 
show
 
positive
 
EBITDA
 
over
 
the
 
LOM.
 
Overall, Coronado’s consolidated operations show
 
positive LOM P&L and LOM EBITDA
 
of
$10.1 billion and $13.6 billion, respectively.
Coronado’s consolidated Mon Valley cash flow summary in nominal dollars assuming a 2%
inflation rate, excluding debt service, is shown in
Table
 
1-5
 
below.
Table 1-5:
 
Project Cash Flow Summary (000)
*
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
Total
2026
2027
2028
2029
2030
Production & Sales tonnes
135,311
-
-
-
-
-
Total Revenue
$32,678,158
$-
$-
$-
$-
$-
EBITDA
$11,822,150
$(369)
$(369)
$(369)
$(369)
$(369)
Net Income
$5,925,986
$(369)
$(369)
$(369)
$(369)
$(369)
Net Cash Provided by Operating Activities
$9,042,337
$(369)
$(369)
$(369)
$(369)
$(312)
Purchases of Property, Plant, and Equipment
$(3,293,945)
$-
$(5,087)
$(29,721)
$(35,261)
$(215,753)
Net Cash Flow
$5,748,391
$(369)
$(5,456)
$(30,090)
$(35,629)
$(216,065)
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2031
2032
2033
2034
2035
2036
Production & Sales tonnes
399
1,810
1,875
1,958
2,029
2,030
Total Revenue
$57,415
$266,199
$281,967
$301,091
$319,037
$326,330
EBITDA
$31,974
$163,768
$175,562
$191,169
$204,833
$209,981
Net Income
$(43,182)
$84,520
$86,628
$82,382
$94,260
$106,329
Net Cash Provided by Operating Activities
$25,910
$135,802
$160,145
$157,652
$168,511
$179,238
Purchases of Property, Plant, and Equipment
$(199,931)
$(1,928)
$-
$(21,158)
$(19,527)
$(204,537)
Net Cash Flow
$(174,021)
$133,874
$160,145
$136,494
$148,984
$(25,299)
 
 
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2037
2038
2039
2040
2041
2042
Production & Sales tonnes
2,062
1,960
1,762
2,366
1,804
1,724
Total Revenue
$338,825
$329,205
$302,680
$415,404
$307,404
$305,722
EBITDA
$217,762
$206,113
$179,715
$261,905
$167,920
$166,433
Net Income
$94,184
$107,142
$79,588
$136,843
$92,275
$83,239
Net Cash Provided by Operating Activities
$190,294
$179,925
$156,327
$197,122
$130,469
$131,680
Purchases of Property, Plant, and Equipment
$(178,362)
$(11,413)
$(10,070)
$(18,939)
$(6,627)
$(11,701)
Net Cash Flow
$11,932
$168,512
$146,257
$178,183
$123,842
$119,979
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2043
2044
2045
2046
2047
2048
Production & Sales tonnes
1,717
1,641
1,719
1,657
1,582
1,704
Total Revenue
$307,825
$296,435
$323,078
$319,329
$311,207
$346,423
EBITDA
$166,345
$155,468
$176,197
$172,276
$164,044
$190,984
Net Income
$97,162
$102,577
$115,995
$111,938
$105,580
$121,920
Net Cash Provided by Operating Activities
$134,459
$126,566
$132,835
$135,759
$130,416
$145,691
Purchases of Property, Plant, and Equipment
$(70,898)
$(32,130)
$(1,608)
$(3,445)
$(20,197)
$(42,226)
Net Cash Flow
$63,561
$94,436
$131,226
$132,313
$110,218
$103,465
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2049
2050
2051
2052
2053
2054
Production & Sales tonnes
1,656
1,732
1,702
1,596
1,642
1,750
Total Revenue
$341,272
$366,419
$363,743
$344,653
$358,264
$385,655
EBITDA
$185,001
$203,854
$199,083
$181,885
$190,949
$208,272
Net Income
$117,207
$139,379
$136,063
$119,219
$124,332
$139,625
Net Cash Provided by Operating Activities
$148,383
$156,450
$155,343
$145,611
$148,945
$159,944
Purchases of Property, Plant, and Equipment
$(21,985)
$(2,264)
$(17,661)
$(35,030)
$(22,841)
$-
Net Cash Flow
$126,398
$154,185
$137,682
$110,580
$126,104
$159,944
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2055
2056
2057
2058
2059
2060
Production & Sales tonnes
1,751
2,609
3,576
3,732
3,846
3,762
Total Revenue
$389,797
$586,754
$812,425
$856,469
$891,518
$881,012
EBITDA
$209,937
$293,768
$402,164
$424,215
$445,248
$430,456
Net Income
$159,520
$155,760
$230,828
$240,983
$258,267
$235,432
Net Cash Provided by Operating Activities
$177,985
$239,301
$313,658
$343,495
$359,216
$357,509
Purchases of Property, Plant, and Equipment
$(503,004)
$(81,075)
$(26,163)
$(36,932)
$(20,244)
$(124,371)
Net Cash Flow
$(325,019)
$158,226
$287,495
$306,563
$338,972
$233,138
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2061
2062
2063
2064
2065
2066
Production & Sales tonnes
3,488
3,390
3,466
3,397
2,961
2,826
Total Revenue
$825,025
$810,082
$836,766
$828,451
$729,294
$703,094
EBITDA
$384,291
$373,425
$383,395
$380,242
$330,841
$317,117
Net Income
$197,731
$249,775
$251,050
$244,672
$199,779
$187,067
Net Cash Provided by Operating Activities
$332,663
$309,606
$303,605
$304,427
$278,545
$263,255
Purchases of Property, Plant, and Equipment
$(48,371)
$(18,997)
$(56,143)
$(55,800)
$(106,035)
$(48,026)
Net Cash Flow
$284,292
$290,609
$247,461
$248,627
$172,510
$215,229
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2067
2068
2069
2070
2071
2072
Production & Sales tonnes
2,479
2,318
2,289
1,438
1,988
1,993
Total Revenue
$623,079
$588,566
$587,014
$372,607
$520,312
$526,958
EBITDA
$274,027
$245,996
$243,975
$120,878
$208,565
$209,313
Net Income
$157,110
$137,332
$132,150
$60,913
$125,427
$130,499
Net Cash Provided by Operating Activities
$236,473
$211,681
$204,662
$72,113
$144,108
$165,794
Purchases of Property, Plant, and Equipment
$(105,470)
$(32,972)
$(35,968)
$(21,665)
$(40,884)
$(29,483)
Net Cash Flow
$131,003
$178,708
$168,694
$50,448
$103,224
$136,311
 
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
9
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2073
2074
2075
2076
2077
2078
Production & Sales tonnes
1,822
2,098
2,055
2,107
1,883
2,129
Total Revenue
$486,489
$513,364
$508,098
$526,120
$474,939
$542,425
EBITDA
$180,965
$192,961
$185,766
$199,986
$169,269
$204,346
Net Income
$110,565
$131,576
$121,087
$124,925
$102,184
$132,803
Net Cash Provided by Operating Activities
$151,740
$149,923
$150,163
$155,728
$139,913
$152,938
Purchases of Property, Plant, and Equipment
$-
$-
$(38,951)
$(73,146)
$(11,367)
$(3,092)
Net Cash Flow
$151,740
$149,923
$111,2
 
12
$82,582
$128,546
$149,846
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2079
2080
2081
2082
2083
2084
Production & Sales tonnes
1,937
1,723
2,242
1,568
2,285
1,637
Total Revenue
$498,511
$448,125
$588,782
$416,070
$612,359
$443,292
EBITDA
$172,232
$139,209
$217,859
$113,527
$222,506
$118,656
Net Income
$108,806
$74,410
$128,734
$54,853
$144,403
$63,019
Net Cash Provided by Operating Activities
$140,295
$115,386
$153,758
$109,676
$151,887
$113,810
Purchases of Property, Plant, and Equipment
$(20,499)
$(63,240)
$(32,548)
$(7,363)
$(18,926)
$(35,128)
Net Cash Flow
$119,796
$52,146
$121,210
$102,313
$132,961
$78,682
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2085
2086
2087
2088
2089
2090
Production & Sales tonnes
1,982
1,477
1,857
1,616
1,993
1,305
Total Revenue
$542,129
$408,032
$518,052
$455,417
$567,535
$375,427
EBITDA
$169,637
$89,713
$145,507
$108,922
$166,892
$55,785
Net Income
$96,625
$31,702
$79,264
$51,566
$96,127
$8,392
Net Cash Provided by Operating Activities
$123,443
$88,067
$104,777
$94,796
$120,752
$66,853
Purchases of Property, Plant, and Equipment
$(35,870)
$(53,613)
$(23,904)
$(32,182)
$-
$(31,114)
Net Cash Flow
$87,573
$34,453
$80,873
$62,614
$120,752
$35,738
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2091
2092
2093
2094
2095
2096
Production & Sales tonnes
1,637
1,612
1,747
1,355
1,731
1,752
Total Revenue
$475,574
$473,016
$517,712
$405,723
$523,488
$535,336
EBITDA
$103,525
$97,847
$113,758
$40,298
$107,715
$110,329
Net Income
$41,301
$32,537
$52,174
$(4,344)
$49,211
$50,915
Net Cash Provided by Operating Activities
$75,371
$81,436
$89,571
$46,746
$76,088
$90,203
Purchases of Property, Plant, and Equipment
$(71,872)
$(66,089)
$-
$-
$(42,121)
$-
Net Cash Flow
$3,499
$15,347
$89,571
$46,746
$33,967
$90,203
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2097
2098
2099
2100
2101
2102
Production & Sales tonnes
1,387
916
393
-
-
-
Total Revenue
$428,077
$285,625
$123,638
$-
$-
$-
EBITDA
$46,344
$27,079
$5,340
$-
$-
$-
Net Income
$2,394
$(3,736)
$(11,836)
$-
$-
$-
Net Cash Provided by Operating Activities
$50,190
$27,994
$(197,622)
$-
$-
$-
Purchases of Property, Plant, and Equipment
$-
$-
$-
$-
$-
$-
Net Cash Flow
$50,190
$27,994
$(197,622)
$-
$-
$-
●
 
Financial model includes 0.9 million tonnes of inferred coal production.
 
Inferred coal represents 0.6% of the
total production, and none of this coal was included in the estimate of reserves.
Consolidated cash flows
 
are driven by
 
annual sales tonnage,
 
which grows from
 
0.4 million
tonnes in
 
2031 to
 
a peak
 
of 3.8
 
million tonnes
 
in 2059.
 
Between years
 
2060 and
 
2089, sales
ranges
 
from
 
1.5
 
million
 
to
 
2.7
 
million
 
tonnes
 
and
 
between
 
years
 
2090-2099,
 
sales
 
range
from 0.4
 
million tonnes
 
to 1.3
 
million tonnes.
 
Projected consolidated
 
revenue grows
 
from
$57.4 million in
 
2031 to
 
a peak
 
of $891.5
 
million in
 
2059.
 
Revenue totals
 
$32.7 billion
 
for
the project’s life.
Consolidated
 
cash
 
flow
 
from
 
operations
 
is
 
positive
 
throughout
 
the
 
projected
 
operating
period,
 
with
 
the
 
exception
 
of
 
post-production
 
years,
 
due
 
to
 
end-of-mine
 
reclamation
spending.
 
Consolidated
 
cash
 
flow
 
from
 
operations
 
peaks
 
at
 
$359.2
 
million
 
in
 
2059
 
and
 
 
ex964p2i0.jpg
 
 
 
ex964p19i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
10
totals $9.0 billion over the project’s life.
 
Capital expenditures total $485.8 million during the
first five years and $3.3 billion over the project’s life.
 
1.10.1
 
Discounted Cash Flow Analysis
Cash
 
flow
 
after
 
tax,
 
but
 
before
 
debt
 
service,
 
generated
 
over
 
the
 
life
 
of
 
the
 
project
 
was
discounted to NPV
 
at a 10.0%
 
discount rate, which
 
represents Coronado’s
 
estimate of the
nominal
 
dollar,
 
risk
 
adjusted
 
weighted
 
average
 
cost
 
of
 
capital
 
(
WACC
)
 
for
 
likely
 
market
participants if the subject reserves were offered
 
for sale.
 
On an un-levered basis, the NPV
of
 
the
 
project
 
cash
 
flows
 
represents
 
the
 
Enterprise
 
Value
 
of
 
the
 
project
 
and
 
amounts
 
to
$287.3 million.
 
The pre-feasibility financial
 
model prepared
 
for the TRS
 
was developed
 
to
test
 
the
 
economic
 
viability
 
of
 
each
 
coal
 
resource
 
area.
 
The
 
NPV
 
estimate
 
was
 
made
 
for
purposes of
 
confirming the
 
economics for
 
classification of
 
coal reserves
 
and not
 
for purposes
of valuing
 
Coronado or
 
its Mon
 
Valley
 
assets.
 
Mine plans
 
were not
 
optimized, and
 
actual
results of
 
the operations
 
may be
 
different, but
 
in all
 
cases, the
 
mine production
 
plan assumes
the properties are under competent management.
1.10.2
 
Sensitivity Analysis
Sensitivity of the NPV results to changes in
 
the key drivers is presented in the chart below.
 
The
 
sensitivity
 
study
 
shows
 
the
 
NPV
 
at
 
the
 
10.0%
 
discount
 
rate
 
when
 
Base
 
Case
 
sales
prices, operating costs, and capital costs are increased
 
and decreased in increments of 5%
within a +/- 15% range.
Figure 1-4:
 
Sensitivity of NPV
As shown, NPV
 
is quite sensitive
 
to change in
 
sales price and
 
operating cost estimates,
 
and
slightly sensitive to changes in capital cost estimates.
 
 
ex964p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
11
1.11
 
Permitting
Due
 
to
 
the
 
projected
 
start-up
 
date
 
of
 
the
 
Mon
 
Valley
 
mines,
 
initial-stage
 
permit
 
work
 
has
been completed to date;
 
however, no
 
permit applications have been
 
submitted to the state
or
 
federal
 
regulatory
 
agencies.
 
The
 
proposed
 
mines
 
are
 
located
 
in
 
an
 
area
 
with
 
a
 
long
history of coal mining, with
 
numerous permitted operations in close proximity.
 
Coal mining
permits
 
are
 
routinely
 
obtained;
 
a
 
2
 
to
 
3-year
 
lead
 
time
 
is
 
recommended.
 
Estimated
expenditures for
 
mine closure
 
and site
 
reclamation are
 
included in
 
the financial
 
model for
each mine or
 
plant site.
 
MM&A is unaware
 
of any obvious
 
or current Coronado
 
permitting
issues that
 
are expected
 
to prevent
 
the issuance
 
of future permits.
 
All coal
 
producers are
subject to a
 
level of uncertainty
 
regarding future clean
 
water permits due
 
to
United States
Environmental Protection Agency
(
EPA
)
 
involvement with state programs.
1.12
 
Conclusion and Recommendations
Sufficient
 
data
 
has
 
been
 
obtained
 
through
 
various
 
exploration,
 
sampling
 
programs,
 
and
mining operations to support the geological interpretations of seam structure and thickness
for coal horizons situated on the Property.
 
The data are of sufficient quantity and
 
reliability
to reasonably support the coal-resource and coal-reserve estimates in this TRS.
The geological data and
 
preliminary feasibility study, which consider mining
 
plans, revenue,
and operating- and
 
capital-cost estimates are sufficient
 
to support the
 
classification of coal
reserves provided herein.
This
 
geologic
 
evaluation
 
conducted
 
in
 
conjunction
 
with
 
the
 
preliminary
 
feasibility
 
study
concludes
 
that
 
the
 
134.4
 
Mt
 
of
 
marketable
 
underground
 
coal
 
reserves
 
identified
 
on
 
the
Property
 
are
 
economically
 
mineable
 
under
 
reasonable
 
expectations
 
of
 
market
 
prices
 
for
metallurgical coal products, estimated operation costs, and capital expenditures.
2
Introduction
2.1
 
Registrant and Terms of Reference
This report
 
was prepared
 
for the
 
sole use
 
of
Coronado Global
 
Resources Inc.
 
(
Coronado
)
and its affiliated
 
and subsidiary companies
 
and advisors.
 
The report provides a
 
statement
of coal resources
 
and coal reserves
 
for Coronado, as
 
defined under
 
the
Australasian Code
for
 
Reporting
 
of
 
Exploration
 
Results,
 
Mineral
 
Resources
 
and
 
Ore
 
Reserves
(
JORC
Code
) as
 
well as
 
under Subpart
 
1300 of
 
Regulation S-K (Regulation
 
S-K 1300)
 
promulgated
by the
United States Securities
 
and Exchange Commission
 
(
SEC
)
.
 
This report was
 
also
prepared
 
in accordance
 
with the
Australasian Code
 
for Public
 
Reporting of
 
Technical
Assessments and Valuations of Mineral Assets
(
VALMIN Code
).
The
 
Mon
 
Valley
 
property
 
is
 
comprised
 
of
 
three
 
separate
 
reserve
 
holdings,
 
namely,
 
the
Pangburn,
 
Shaner
 
and
 
Fallowfield
 
proposed
 
underground
 
mines
 
in
 
the
 
Upper
 
Freeport
seam.
 
 
ex964p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
12
The report
 
provides a
 
statement of
 
coal resources
 
and coal
 
reserves for
 
Coronado at
 
the
Property.
 
Exploration results
 
and Resource
 
calculations were
 
used as
 
the basis
 
for the
 
mine
planning and the
 
preliminary feasibility study
 
completed to determine
 
the extent and
 
viability
of the reserve.
Coal resources
 
and coal reserves
 
are herein reported
 
in metric
 
units of
 
measurement and
are rounded to millions of metric tonnes (
Mt
).
2.2
 
Information Sources
This TRS
 
is based
 
on information
 
provided by Coronado
 
and reviewed
 
by Scott
 
Peterson,
CPG; and Justin S. Douthat, PE, MBA.
Coronado
 
engaged
 
MM&A
 
to
 
conduct
 
a
 
coal
 
resource
 
and
 
reserve
 
evaluation
 
of
 
the
Coronado coal properties as
 
of December 31, 2021, the
 
effective date of
 
this TRS for Mon
Valley.
 
For the evaluation, the following tasks were to be completed:
 
>
 
Conduct a site visit to the projected resource/reserve area;
>
 
Process
 
the
 
information
 
supporting
 
the
 
estimation
 
of
 
coal
 
resources
 
and
 
reserves
 
into
geological models;
 
>
 
Develop life-of-reserve mine (
LOM
) plans and financial models;
>
 
Hold discussions with Coronado company management; and
 
>
 
Prepare and issue a TRS providing a statement of coal resources and reserves which
would include:
-
 
A description of the mines and facilities.
 
-
 
A description of the evaluation process.
-
 
An
 
estimation
 
of
 
coal
 
resources
 
and
 
reserves
 
with
 
compliance
 
elements
 
as
 
stated
under the JORC Code and the SEC Regulation S-K 1300.
2.3
 
Personal Inspections
MM&A is
 
very familiar
 
with the
 
Mon Valley properties,
 
having provided
 
a variety
 
of geological
and
 
engineering
 
evaluations
 
of
 
the
 
subject
 
property
 
and
 
neighboring
 
properties
 
in
 
recent
years.
 
No facilities are constructed on the properties.
3
Property Description
3.1
 
Location
The Mon
 
Valley
 
Complex will
 
include the
 
Pangburn, Shaner,
 
and Fallowfield
 
underground
mines
 
in
 
the
 
Upper
 
Freeport
 
coal
 
seam.
 
The
 
properties
 
are
 
located
 
approximately
 
22.5
kilometers southeast of Pittsburgh.
 
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
13
The
 
property
 
is
 
located
 
in
 
Allegheny,
 
Washington,
 
and
 
Westmoreland
 
Counties,
Pennsylvania.
 
Mining operations here have not yet been initiated.
 
The Property is located
on
 
portions
 
of
 
eight
United
 
States
 
Geological
 
Survey
(
USGS
)
 
quadrangles:
 
Irwin;
Glassport;
 
Monongahela;
 
Donora;
 
Smithton;
 
California;
 
Ellsworth;
 
and
 
Hackett.
 
The
coordinate system and datum
 
used for the model
 
of Mon Valley
 
and the subsequent maps
were produced in the Pennsylvania State Plane South system, NAD 27.
3.2
 
Titles, Claims or Leases
The property is composed
 
of 41,615 total hectares,
 
of which 1,339 are
 
leased from private
landholders
 
under
 
two
 
leases,
 
and
 
40,276
 
hectares
 
are
 
owned
 
by
 
Coronado.
 
Subject
 
to
Coronado’s
 
exercising
 
its
 
renewal
 
rights
 
thereunder,
 
both
 
of
 
the
 
leases
 
expire
 
upon
exhaustion of
 
the relevant
 
coal reserves,
 
which is
 
expected to
 
occur in
 
2099.
 
MM&A has
not carried out
 
a separate title
 
verification for the
 
coal properties and
 
has not verified
 
leases,
deeds,
 
surveys,
 
or
 
other
 
property-control
 
instruments
 
pertinent
 
to
 
the
 
subject
 
resources.
 
Tenure
 
was separately reviewed by Coronado’s legal advisors.
 
Coronado has represented
to MM&A
 
that it
 
controls the
 
mining rights
 
to the
 
reserves as
 
shown on
 
its property
 
maps,
and MM&A has accepted these as being a true and accurate depiction of the mineral rights
controlled by
 
Coronado.
 
The TRS
 
assumes the
 
properties are
 
developed under
 
responsible
and experienced management.
 
3.3
 
Mineral Rights
Coronado supplied property
 
control maps to
 
MM&A related to
 
properties for which
 
mineral
and/or
 
surface
 
property
 
are
 
controlled
 
by
 
Coronado.
 
While
 
MM&A
 
accepted
 
these
representations
 
as
 
being
 
true
 
and
 
accurate,
 
MM&A
 
has
 
no
 
knowledge
 
of
 
past
 
property
boundary disputes
 
or other
 
concerns, through
 
past knowledge
 
of the
 
Property,
 
that would
signal concern over future mining operations or development potential.
Property
 
control
 
in
 
Appalachia
 
can
 
be
 
intricate.
 
Coal-mining
 
properties
 
are
 
typically
composed
 
of
 
numerous
 
property
 
tracts
 
which
 
are
 
owned
 
and/or
 
leased
 
from
 
both
 
land-
holding companies
 
and private
 
individuals or
 
companies.
 
It is
 
common to
 
encounter severed
ownership,
 
with
 
different
 
entities
 
or
 
individuals
 
controlling
 
the
 
surface
 
and
 
mineral
 
rights.
 
Mineral control in
 
the region is
 
typically characterized by
 
leases or ownership
 
of larger tracts
of land, with surface control generally comprised of smaller tracts, particularly in developed
areas.
Legal mining rights
 
may reflect a
 
combination of fee
 
or mineral ownership
 
and fee
 
or mineral
leases of coal lands through various surface and mineral lease agreements.
 
Control of the surface property is necessary to conduct surface mining but is not necessary
to conduct underground mining.
 
Given that the vicinity of the Mon Valley properties has an
extensive history of
 
coal mining, Coronado
 
and its predecessors
 
have a successful history
of obtaining any necessary rights and the associated permits to mine.
 
 
ex964p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
14
3.4
 
Encumbrances
No Title Encumbrances
 
are known.
 
By assignment,
 
MM&A did
 
not complete
 
a query
 
related
to Title Encumbrances.
 
3.5
 
Other Risks
There is always risk involved in property
 
control.
 
Coronado and its predecessor, CONSOL,
have both had their legal
 
teams examine the deeds and title
 
control in order to minimize
 
the
risk.
 
4
Accessibility, Climate, Local Resources,
Infrastructure and Physiography
4.1
 
Topography,
 
Elevation and Vegetation
Topography
 
of
 
the
 
area
 
surrounding
 
the
 
proposed
 
Mon
 
Valley
 
complex
 
is
 
typical
 
of
 
the
Northern Appalachian
 
Plateau consisting
 
of broad
 
river valleys
 
and rolling
 
hills, with
 
some
upland regions.
 
Surface elevations near
 
the Property range
 
from approximately 396
 
meters
above sea
 
level in
 
upland regions
 
to approximately
 
220 meters
 
at stream
 
level.
 
The property
is moderately
 
vegetated by
 
primarily oak
 
hardwood forests,
 
but the
 
majority of
 
the land
 
is
developed for
 
farm and
 
residential use.
 
The property
 
is situated
 
near the
 
major urban
 
center
of Pittsburgh, PA and is considered suburban.
 
4.2
 
Access and Transport
There is general
 
access to the
 
Mon Valley property via
 
a well-developed network
 
of primary,
secondary,
 
and unimproved
 
roads.
 
The Monongahela
 
and Youghiogheny
 
Rivers traverse
the
 
Property
 
from
 
south
 
to
 
north.
 
There
 
are
 
numerous
 
four-lane
 
limited-access
 
roads
situated within or
 
adjacent to the Property
 
as well as
 
a network of
 
improved two-lane state
and county
 
roads.
 
U.S. Interstate
 
70 and
 
Pennsylvania Route
 
51 traverse
 
the Fallowfield
and
 
Pangburn
 
properties,
 
respectively.
 
Numerous
 
secondary
 
and
 
unimproved
 
roads
provide direct access to
 
the mine property, some being state-
 
and town- maintained.
 
These
roads typically stay open throughout the
 
year.
 
There are numerous transportation/logistical
options for
 
shipping product.
 
The primary
 
means of
 
transport for
 
produced coal
 
would be
by barge
 
on the
 
Monongahela River/Ohio
 
River system.
 
Additionally, a CSX
 
rail line
 
located
along the banks of
 
the Monongahela River would
 
provide another option for
 
the shipment of
coal.
4.3
 
Proximity to Population Centers
 
The Mon Valley property lies
 
near the communities
 
of Bentleyville, Lockview, Monongahela,
Elizabeth, Sutersville, and
 
Irwin, Pennsylvania approximately
 
16 kilometers to
 
32 kilometers
southeast
 
of
 
Pittsburgh,
 
and
 
16
 
kilometers
 
to
 
32
 
kilometers
 
from
 
Washington
 
and
McKeesport, Pennsylvania.
 
As of the 2020 census Pittsburgh had a population of 302,971
residents; McKeesport, 18,825; and Washington, 13,176.
 
 
 
ex964p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
15
4.4
 
Climate and Length of Operating Season
The climate of the region is classified
 
as warm-summer humid continental with four distinct
seasons:
 
warm summers,
 
cold winters,
 
and moderate
 
fall and
 
spring seasons.
 
Precipitation
in
 
the region
 
is consistent
 
throughout the
 
year with
 
the most
 
rain falling
 
in spring
 
and
 
the
early
 
months
 
of
 
summer.
 
Average
 
yearly
 
rainfall
 
is
 
53.1
 
centimeters.
 
Summer
 
months
typically begin
 
in late
 
May and
 
end in
 
early September
 
and range
 
in average
 
temperature
from 51 to 84 degrees
 
Fahrenheit (or 10.6 to
 
28.9 degrees Celsius).
 
Winters typically begin
in mid to late November and run until mid to late
 
March with average temperatures ranging
from 22 to
 
50 degrees Fahrenheit
 
(or -5.6 to
 
10 degrees Celsius).
 
Precipitation in the
 
winter
typically
 
comes
 
in
 
the
 
form
 
of
 
snowfall
 
or
 
as
 
a
 
wintery
 
mix
 
(sleet
 
and
 
snow)
 
with
 
severe
snowfall events occurring
 
occasionally.
 
Seasonal variations
 
in climate typically
 
do not
 
affect
underground mining in
 
Pennsylvania.
 
However, weather events could
 
potentially negatively
impact efficiency
 
of surface
 
and preparation
 
plant operations
 
on a
 
very limited
 
basis, typically
lasting less than a few days.
4.5
 
Infrastructure
The
 
Mon
 
Valley
 
property
 
has
 
sources
 
of
 
water,
 
power,
 
personnel,
 
and
 
supplies
 
readily
available
 
for
 
use.
 
Personnel
 
have
 
historically
 
been
 
sourced
 
from
 
the
 
surrounding
communities in
 
Allegheny,
 
Washington,
 
and Westmoreland
 
Counties, and
 
have proven
 
to
be
 
adequate
 
in
 
numbers to
 
operate
 
the mines.
 
As
 
mining
 
is common
 
in
 
the
 
surrounding
areas, the workforce is
 
generally familiar with mining
 
practices, and many are
 
experienced
miners.
 
Water is expected to be sourced locally
 
from nearby public water sources
 
or rivers.
 
Electricity is anticipated to be sourced from
West Penn Power
(
West Penn
)
 
or
Duquesne
Light
(
Duquesne Light
)
.
 
The service industry in the areas surrounding
 
the proposed mine
complex has
 
historically provided
 
supplies, equipment
 
repairs and
 
fabrication, etc.
 
Barge
transport
 
on
 
the
 
Monongahela
 
River/Ohio
 
River
 
system
 
will
 
serve
 
as
 
the
 
main
 
means
 
of
product transport
 
from the
 
mine, and
 
currently serve as
 
a means
 
of coal
 
transportation for
neighboring
 
Pittsburgh seam
 
operations.
 
Rail access
 
is provided
 
by a
 
CSX Corporation
(
CSX
)
 
rail line.
 
5
History
5.1
 
Previous Operation
The
 
property
 
was
 
formerly
 
controlled
 
by
Consolidation
 
Coal
 
Company
(
CONSOL
).
 
Historic
 
underground
 
operations
 
were
 
active
 
in
 
the
 
area
 
in
 
the
 
early
 
1900’s
 
and
 
contour
surface mining was
 
performed in the
 
1950 to 1960
 
era.
 
Coronado acquired the
 
properties
from CONSOL in March 2016.
5.2
 
Previous Exploration
The properties have
 
been extensively explored by
 
subsurface drilling efforts
 
carried out by
numerous
 
entities,
 
most
 
of
 
which
 
were
 
completed
 
prior
 
to
 
acquisition
 
by
 
Coronado.
 
The
 
 
ex964p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
16
majority of the drilling was accomplished using vertical continuous (diamond) coring
 
and air
rotary methods.
Drill
 
records
 
indicate
 
that
 
independent
 
contract
 
drilling
 
operators
 
have
 
been
 
engaged
periodically to carry out exploration drilling
 
on the properties.
 
Geophysical logging on those
properties
 
acquired
 
from
 
CONSOL
 
was
 
often
 
performed
 
by
 
both
 
CONSOL’s
 
in-house
logging services and outside logging firms.
 
6
Geological Setting, Mineralization and Deposit
6.1
 
Regional, Local and Property Geology
The
 
property
 
lies
 
in
 
the
 
Northern
 
Appalachian
 
Coal
 
basin
 
in
 
the
 
Appalachian
 
Plateau
physiographic
 
province.
 
The
 
coal
 
deposits
 
in
 
the
 
eastern
 
USA
 
are
 
the
 
oldest
 
and
 
most
extensively developed coal deposits in
 
the country.
 
The coal deposits on
 
the properties are
Carboniferous
 
in
 
age,
 
being
 
of
 
the
 
Pennsylvanian
 
system.
 
Overall,
 
these
 
Carboniferous
coals
 
contain
 
roughly
 
two-fifths
 
of
 
the
 
bituminous
 
coal
 
deposits
 
in
 
the
 
United
 
States
 
and
extend over 1,448 kilometers
 
from northern Alabama to
 
Pennsylvania and are part of
 
what
is known
 
as the
Appalachian Basin
.
 
The Appalachian
 
Basin is
 
more than
 
402 kilometers
wide and, in some portions, contains over 60 coal seams of varying economic significance.
Seams
 
of
 
economic
 
significance
 
typically
 
range
 
between
 
0.3
 
meters
 
to
 
1.8
 
meters
 
in
thickness,
 
with
 
relatively
 
little
 
structural
 
deformation.
 
Regional
 
structure
 
is
 
typically
characterized by gently dipping strata to the northwest at less than one percent.
Seams of the Allegheny Formation have historically been mined in
 
the Pennsylvania region
with the Upper Freeport seam being one of the principal seams in the formation.
 
Coal from
the area has historically sold in thermal and metallurgical markets.
Future operations
 
at the
 
Mon Valley
 
properties will
 
extract the
 
Upper Freeport
 
coal seam,
which covers large
 
areas of Pennsylvania,
 
Ohio, Maryland, and
 
West Virginia.
 
The Upper
Freeport
 
seam is
 
situated at
 
the top
 
of the
 
Allegheny Group
 
of
 
the middle
 
Pennsylvanian
period (307-315 million years ago).
 
The top of the Upper Freeport seam is commonly used
as
 
the
 
marker
 
between
 
the
 
top
 
of
 
the
 
Allegheny
 
Formation
 
and
 
the
 
overlying
 
Upper
Pennsylvanian
 
Conemaugh
 
Group.
 
The
 
Allegheny
 
Formation
 
is
 
made
 
up
 
of
 
laminated
cyclothemic sequences of
 
coal, shale, limestone,
 
and clay.
 
The Upper Freeport
 
seam lies
generally
 
around
 
183
 
meters
 
below
 
the
 
Pittsburgh
 
seam.
 
Deposits
 
associated
 
with
 
the
Upper Freeport are often irregular and
 
dislocated deposits (formed in domed peat swamps
commonly referred to as “peat islands”).
 
The
 
primary
 
structural
 
controls
 
on
 
the
 
Upper
 
Freeport
 
coal
 
basin
 
are
 
localized
 
syn-
depositional anticlines and
 
synclines that directly
 
influence the accumulation
 
of peat
 
bogs.
 
These structures
 
create gently
 
folded and
 
rolling coal strata.
 
The axis of
 
the Waynesburg
and
 
Port
 
Royal
 
(Irwin)
 
synclines
 
pass
 
through
 
the
 
center
 
and
 
eastern
 
portions
 
of
 
the
properties
 
with
 
a
 
trend
 
and
 
incline
 
to
 
the
 
Northeast.
 
The
 
Amity,
 
Murrysville,
 
and
 
Belle
Vernon anticlines (listed
 
from west to east) reside to the center and western portions of the
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
17
properties.
 
These anticlines
 
often coincide
 
with thicker
 
coal seams
 
where peat
 
accumulated
in
 
domes
 
along
 
the
 
anticlinal
 
crest.
 
It
 
is
 
understood
 
that
 
local
 
anticlines
 
represent
 
the
upthrown side of syn-depositionally active deep faults.
 
Inversely, fluvial channel sediments
were deposited on the structural downthrown side within synclines.
 
Within
 
the
 
Pangburn,
 
Shaner,
 
and
 
Fallowfield
 
mine-plan
 
areas,
 
the
 
Upper
 
Freeport
 
is
typically 183
 
meters to 335
 
meters below
 
the ground surface.
 
Mine access
 
is therefore to
be
 
provided
 
by
 
shaft
 
and
 
slope
 
development.
 
The
 
planned
 
Pangburn
 
shaft
 
depth
 
is
approximately
 
195
 
meters
 
in
 
depth.
 
The
 
shaft
 
depths
 
at
 
the
 
projected
 
locations
 
for
 
the
Shaner and Fallowfield shafts range from approximately 232 meters to 268 meters.
 
6.2
 
Mineralization
The coal to be produced at The Mon
 
Valley Complex is typically high volatile (>31% volatile
matter) bituminous coal.
 
The
 
generalized
 
stratigraphic
 
columnar
 
section
 
in
Figure
 
6-1
 
demonstrates
 
the
 
vertical
relationship of the principal coal seams and rock formations on the Property.
 
 
ex964p2i0.jpg
 
 
 
 
ex964p27i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
18
Figure 6-1:
 
Stratigraphic Column
(not to scale)
6.3
 
Deposits
Historic underground
 
mining has
 
occurred in
 
the overlying
 
Pittsburgh Seam
 
on this
 
property.
 
Contour
 
surface
 
mining
 
on
 
the
 
Pittsburgh
 
and
 
Redstone
 
outcrop
 
has
 
occurred
 
within
 
the
 
 
ex964p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
19
areas projected for the coal refuse disposal area, the slope portal area
 
and the preparation
plant area.
 
The three proposed
 
mines (Pangburn, Shaner, and
 
Fallowfield) are all
 
projected
to be deep mines in the Upper Freeport seam.
 
Mining is projected in areas where the total
seam thickness exceeds 1.2 meters.
 
Areas of sandstone washout and seam thinning have
been excluded
 
from projections by
 
MM&A personnel.
 
Additional exploration could
 
identify
additional
 
geologically
 
limiting
 
features,
 
which
 
could
 
alter
 
the
 
proposed
 
mine
 
plan.
 
The
Upper Freeport seam in the
 
projected areas ranges from 0.7
 
meters to 3.1 meters thick
 
and
averages 1.95 meters thick.
7
Exploration
7.1
 
Nature and Extent of Exploration
Extensive
 
exploration
 
in
 
the
 
form
 
of
 
subsurface
 
drill
 
efforts
 
has
 
been
 
carried
 
out
 
on
 
the
Property by numerous entities, most
 
of which efforts were completed
 
prior to the acquisition
by Coronado.
 
Diamond core and rotary
 
drilling are the primary
 
types of exploration on
 
the
Property.
 
Data for correlation and
 
mining conditions are derived from
 
core descriptions and
geophysical logging (e-logging).
 
Coal quality analyses were also employed during the core
exploration process.
 
A total
 
of approximately
 
750 core
 
and rotary
 
holes have
 
been drilled
for exploration.
The location of the drilling is shown on the maps included in
Appendix B
.
The concentration of
 
exploration varies slightly
 
across the Property.
 
Drilling on the Property
is
 
typically
 
sufficient
 
for
 
delineation
 
of
 
potential
 
underground
 
mineable
 
benches.
 
Core
logging is carried out
 
by professional geologists in
 
cases where roof and
 
floor strata are of
particular
 
interest
 
and
 
in
 
cases
 
where
 
greater
 
resolution
 
and
 
geologic
 
detail
 
are
 
needed.
 
Generally speaking, however,
 
most drill hole data come from
 
simplified driller’s logs, which
often
 
lack specific
 
details regarding
 
geotechnical conditions
 
and specific
 
geology,
 
making
correlations
 
and
 
floor
 
and
 
roof
 
conditions
 
difficult
 
to
 
determine.
 
Geophysical
 
logging
 
(e-
logging) techniques, by contrast,
 
document specific details useful
 
for geologic interpretation
and mining conditions.
 
Given the variability
 
of data-gathering methods,
definitive
 
mapping
of
 
future
 
mining
 
conditions may
 
not be
 
possible,
 
but projections
 
and
 
assumptions
 
can
 
be
made within a
reasonable
 
degree of certainty.
A
 
significant
 
effort
 
was
 
put
 
into
 
verifying
 
the
 
integrity
 
of
 
the
 
database.
 
Once
 
this
 
was
established, stratigraphic columnar sections were generated using cross-sectional analysis
to establish or confirm coal seam correlations.
 
A typical cross-section is shown in
Figure 7-
1
.
 
 
ex964p2i0.jpg ex964p29i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
20
Figure 7-1:
 
Mon Valley Cross-Section
Due to
 
the long
 
history of
 
exploration by
 
various parties
 
on the
 
Property,
 
a wide
 
variety of
survey
 
techniques
 
exist
 
for
 
documentation
 
of
 
data
 
point
 
locations.
 
Many
 
of
 
the
 
older
exploration drill holes appear to have been located by survey and more recently-completed
drill
 
holes
 
are
 
often
 
located
 
by
 
high-resolution
 
Global
 
Positioning
 
System
 
(
GPS
)
 
units.
 
However, some holes appear to have been approximately located using USGS topography
maps
 
or
 
other
 
methods
 
which
 
are
 
less
 
accurate.
 
Therefore,
 
discretion
 
had
 
to
 
be
 
used
regarding the accuracy for the location
 
and ground surface elevation of
 
some of these older
drill
 
holes.
 
In
 
instances
 
where
 
a
 
drill
 
hole
 
location
 
(or
 
associated
 
coal
 
seam
 
elevations)
appeared
 
to
 
be
 
inconsistent
 
with
 
the
 
overall
 
structural
 
trend
 
(or
 
surface
 
topography
 
for
surface-mineable areas),
 
the data
 
point was
 
not honored
 
for geological
 
modeling.
 
Others
with apparently minor variances were adjusted and then used by MM&A.
 
Surveying
 
of the
 
underground and
 
surface mined
 
areas has
 
been performed
 
by the
 
mine
operators
 
and/or
 
their
 
consulting
 
surveyors.
 
By
 
assignment,
 
MM&A
 
did
 
not
 
verify
 
the
accuracy or completeness
 
of supplied
 
mine maps
 
but accepted
 
this information as
 
being the
work of responsible engineers and surveyors.
MM&A compiled comprehensive
 
topographic map files
 
by selecting the
 
best available aerial
mapping for each area and filling any gaps with digital USGS topographic mapping.
7.2
 
Non-Drilling Procedures and Parameters
All
 
pertinent
 
data
 
used
 
to
 
characterize
 
the
 
coal
 
resources
 
and
 
coal
 
reserves
 
have
 
been
acquired via exploration-based
 
drilling methods.
 
The region has
 
historically produced and
sold
 
Upper
 
Freeport-based
 
coal
 
into
 
metallurgical
 
and
 
thermal
 
markets,
 
enhancing
 
the
confidence of the marketability and quality of the resource.
 
7.3
 
Drilling Procedures
Core
 
drilling
 
methods
 
utilize
 
NX-size
 
(~5.4
 
centimeter)
 
or
 
similar-sized
 
core
 
cylinders
 
to
recover
 
core
 
samples,
 
which
 
can
 
be
 
used
 
to
 
delineate
 
geologic
 
characteristics,
 
for
 
coal-
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
21
quality
 
testing,
 
and
 
for
 
geotechnical
 
logging.
 
With
 
core
 
holes,
 
geophysical
 
logs
 
are
especially useful in verifying the core recovery of both the coal samples (for assurance that
the
 
sample
 
is
 
representative
 
of
 
the full
 
seam)
 
and
 
of
 
the
 
roof and
 
floor
 
rock samples
 
(for
evaluating ground control
 
characteristics of deep
 
mineable coal seams).
 
In addition to
 
the
core holes, rotary-drilled holes also
 
exist on most of the
 
Property.
 
Data for the rotary-drilled
holes are mainly derived
 
from downhole geophysical
 
logs, which are used
 
to interpret coal
and rock
 
thickness and
 
depth, since
 
logging of
 
the drill
 
cuttings is
 
unreliable.
 
Exploratory
drilling generally
 
requires drilling to
 
depths of over
 
152 meters
 
to penetrate
 
the target
 
coal
seam at Mon Valley.
A
 
wide
 
variety
 
of
 
core-logging
 
techniques
 
exist
 
for
 
the
 
properties.
 
For
 
many
 
of
 
the
 
core
holes, the
 
primary data source
 
is a generalized
 
lithology description by
 
the driller,
 
typically
supplemented
 
by
 
a
 
more
 
detailed
 
core
 
log
 
completed
 
by
 
a
 
geologist.
 
These
 
drilling
 
logs
were provided to
 
MM&A as a
 
geological database.
 
MM&A geologists were not
 
involved in
the production
 
of original
 
core logs
 
but did perform
 
a basic
 
check of
 
information within
 
the
provided database.
 
Where geophysical logs for such holes were available, they were used
by MM&A geologists to verify the coal thickness and core recovery of seams.
 
7.4
 
Hydrology
Based on historical successful production of Upper
 
Freeport, and stratigraphically proximal
seams in the region,
 
the Mon Valley
 
Complex is not expected to
 
have hydrologic concerns
of
 
material
 
issue.
 
Future
 
mining
 
is
 
projected
 
to
 
occur
 
in
 
areas
 
exhibiting
 
similar
hydrogeological conditions as
 
past mining, including
 
stream undermining and undermining
of
 
aquifers.
 
Based
 
upon
 
the
 
successful
 
history
 
of
 
mining
 
in
 
the
 
region
 
with
 
regards
 
to
hydrogeological features, MM&A assumes that
 
the operations will not be hindered
 
by such
issues.
The Pittsburgh
 
seam has
 
been mined
 
extensively above
 
the Upper
 
Freeport seam
 
on the
Property.
 
The interval (approximately 183
 
meters) between the seams is
 
anticipated to be
adequate to
 
minimize inflow
 
of water
 
to the
 
planned operations
 
from the
 
overlying Pittsburgh
works.
7.5
 
Geotechnical Data
Mining plans
 
for potential
 
underground mines
 
were developed
 
by Coronado
 
and modified
by MM&A to
 
fit current property
 
constraints.
 
Pillar stability was
 
tested by MM&A
 
using the
Analysis
 
of
 
Coal
 
Pillar
 
Stability
 
(ACPS)
 
program
 
that
 
was
 
developed
 
by
 
the
National
Institute for Occupational Safety and Health (
NIOSH
)
.
 
MM&A reviewed the results from
the ACPS analysis and considered them in the development of the LOM plan.
 
 
ex964p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
22
8
Sample Preparation,
 
Analyses and Security
8.1
 
Prior to Sending to the Lab
Most of the
 
coal samples have been
 
obtained from the
 
Property by subsurface exploration
using core
 
drilling techniques.
 
The protocol
 
for preparing
 
and testing
 
the samples
 
has varied
over
 
time and
 
is not
 
well documented
 
for the
 
older holes
 
drilled
 
on the
 
Property.
 
Typical
core-drilling
 
sampling
 
methods
 
for
 
coal
 
in
 
the
 
United
 
States
 
involves
 
drilling
 
through
 
the
seam, removing the core from the barrel, describing the lithology, wrapping the sample in a
sealed
 
plastic
 
sleeve
 
and
 
placing
 
it
 
lengthwise
 
into
 
a
 
covered
 
core
 
box,
 
and
 
carefully
marking hole ID
 
and depth intervals
 
on each box
 
and lid, allowing
 
the core to
 
be delivered
to a
 
laboratory in
 
correct stratigraphic
 
order, and with
 
original moisture
 
content.
 
This process
has been the norm for both historical and ongoing exploration activities at the Property.
This work is typically performed by the
 
supervising driller, geologist, or company personnel.
 
Samples are most often delivered
 
to the company by the
 
driller after each shift or
 
acquired
by company personnel or representatives.
 
Most of the coal core
 
samples were obtained by
previous or
 
current operators
 
on the
 
Property.
 
MM&A did
 
not participate
 
in the
 
collection,
sampling and analysis of the
 
core samples.
 
However, it is reasonable to assume, given
 
the
consistency of quality from previous operators,
 
that these samples were generally collected
and
 
processed
 
under
 
industry
 
best
 
practices.
 
This
 
assumption
 
is
 
based
 
on
 
MM&A’s
familiarity with the operating companies and the companies used to perform the analyses.
 
8.2
 
Lab Procedures
Coal
 
quality
 
testing
 
has
 
been
 
performed
 
over
 
many
 
years
 
by
 
operating
 
companies
 
using
different laboratories
 
and testing
 
regimens.
 
Some of
 
the samples
 
have raw
 
analyses and
washabilities on the full seam (with coal and rock parting layers co-mingled)
 
and are mainly
useful for characterizing the coal quality for projected production from underground mining.
 
Other
 
samples
 
have
 
coal
 
and
 
rock
 
analyzed
 
separately,
 
the
 
results
 
of
 
which
 
can
 
be
manipulated to forecast either surface or
 
underground mining quality.
 
Care has been taken
to
 
use
 
only
 
those
 
analyses
 
that
 
are
 
representative
 
of
 
the
 
coal
 
quality
 
parameters
 
for
 
the
appropriate mining type for each sample.
 
Unlike many Appalachian properties, Mon Valley
only
 
has
 
interest
 
in
 
one
 
deep
 
seam;
 
therefore,
 
the
 
analyses
 
have
 
likely
 
been
 
completed
following a consistent protocol.
Standard procedure
 
upon receipt
 
of core
 
samples by
 
the testing
 
laboratory is
 
to log
 
the depth
and
 
thickness of
 
the sample,
 
then
 
perform testing
 
as
 
specified by
 
a
 
representative
 
of
 
the
operating company.
 
Each sample is then analyzed in accordance with procedures defined
under
American Society
 
for Testing
 
and Materials
 
(
ASTM
)
 
standards including,
 
but not
limited
 
to;
 
washability
 
(ASTM
 
D4371);
 
ash
 
(ASTM
 
D3174);
 
sulfur
 
(ASTM
 
D4239);
 
Btu/lb.
(ASTM D5865); volatile matter (ASTM D3175); Free Swell Index (
FSI
) (ASTM D720).
 
 
ex964p2i0.jpg
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
23
9
Data Verification
9.1
 
Procedures of Qualified Person
MM&A
 
reviewed
 
the
 
digital
 
geologic
 
database
 
supplied
 
by
 
Coronado.
 
The
 
database
consists
 
of
 
data
 
records,
 
which
 
include
 
drill
 
hole
 
information
 
for
 
holes
 
that
 
lie
 
within
 
and
adjacent
 
to
 
the
 
Property
 
and
 
records
 
for
 
numerous
 
supplemental
 
coal
 
seam
 
thickness
measurements.
 
Upon completion
 
of
 
the database
 
verification,
 
copies of
 
each
 
entry were
printed,
 
and
 
cross
 
referenced
 
to
 
the
 
original
 
document
 
for
 
verification.
 
Once
 
the
 
initial
integrity of
 
the database
 
was established,
 
stratigraphic columnar
 
sections were
 
generated
using cross-sectional analysis to establish
 
or confirm coal-seam correlations.
 
Geophysical
logs were used wherever available to assist in
 
confirming the seam correlation and to verify
proper seam thickness measurements and recovery of coal samples.
 
After
 
establishing
 
and/or
 
verifying
 
proper
 
seam
 
correlation,
 
seam
 
data
 
control
 
maps
 
and
geological cross-sections
 
were generated
 
and again
 
used to
 
verify seam
 
correlations and
data integrity.
 
Once the
 
database was
 
fully vetted,
 
seam thickness,
 
base-of-seam elevation,
roof and floor lithology,
 
and overburden maps were independently generated
 
for use in the
mine planning process.
9.2
 
Limitations
As with
 
any exploration
 
program, localized
 
anomalies cannot
 
always be
 
discovered.
 
The
greater
 
the density
 
of the
 
samples taken,
 
the less
 
the risk.
 
Once an
 
area
 
is identified
 
as
being of interest for inclusion in the mine
 
plan, additional samples are taken to help reduce
the risk in
 
those specific areas.
 
In general, provision
 
is made in
 
the mine planning
 
portion
of the
 
study to allow
 
for localized
 
anomalies that
 
are typically classed
 
more as
 
a nuisance
than a hinderance.
 
9.3
 
Opinion of Qualified Person
Sufficient data has
 
been obtained through
 
various exploration and sampling
 
programs and
mining operations to support the geological interpretations of seam structure and thickness
for coal horizons situated on the Property.
 
The data is of sufficient quantity and reliability
 
to
reasonably support the coal resource and coal reserve estimates in this TRS.
10
Mineral Processing and Metallurgical Testing
10.1
 
Testing Procedures
Separate
 
tabulations
 
have
 
been
 
compiled
 
for
 
basic
 
chemical
 
analyses
 
(both
 
raw
 
and
washed quality),
 
petrographic data,
 
rheological data
 
and chlorine,
 
ash, ultimate
 
and sulfur
analysis.
 
Available coal
 
quality data
 
was tabulated
 
by resource
 
area in
 
a Microsoft®
 
EXCEL workbook
and the
 
details of
 
that work
 
are maintained
 
on file
 
at the
 
offices
 
of Coronado
 
and MM&A.
 
 
 
ex964p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
24
These tables
 
also provide
 
basic statistical
 
analyses of
 
the coal
 
quality data
 
sets, including
average
 
value;
 
maximum
 
and
 
minimum
 
values;
 
and
 
the
 
number
 
of
 
samples
 
available
 
to
represent each quality parameter of the seam.
 
Coal samples that were deemed by MM&A
geologists
 
to
 
be unrepresentative
 
were
 
not used
 
for
 
statistical
 
analysis of
 
coal
 
quality,
 
as
documented
 
in
 
the
 
tabulations.
 
A
 
representative
 
group
 
of
 
drill
 
hole
 
samples
 
from
 
the
Property
 
were
 
then
 
checked against
 
the original
 
drill laboratory
 
reports to
 
verify accuracy
and correctness.
The amount
 
and areal
 
extent of
 
coal sampling
 
for geological
 
data is
 
generally sufficient
 
to
represent
 
the
 
quality
 
characteristics
 
of
 
the
 
coal
 
horizons
 
and
 
allow
 
for
 
proper
 
market
placement of the subject coal seams.
 
For some of the coal deposits
 
there are considerable
laboratory data from
 
core samples
 
that are representative
 
of full extent
 
of the resource
 
area;
and for others there are
 
more limited data to represent
 
the resource area.
 
For example, in
the active
 
operations with
 
considerable previous
 
mining, there
 
may be
 
limited quality
 
data
within
 
some of
 
the remaining
 
resource areas;
 
however,
 
in
 
those cases
 
the core
 
sampling
data can be
 
supplemented with operational
 
data from mining
 
and shipped quality
 
samples
representative of the resource area.
10.2
 
Relationship of Tests to the Whole
The extensive sampling and testing procedures typically followed in the coal industry result
in an excellent
 
correlation between samples and
 
marketable product.
 
The Upper Freeport
seam has a long
 
history of saleable production in
 
the high-volatile metallurgical and thermal
markets, consistent with
 
exploration results.
 
Degradation of
 
coking coal
 
characteristics over
time is not anticipated to be an issue.
10.3
 
Lab Information
Each sample is
 
analyzed at area
 
Laboratories that operate
 
in accordance with
 
procedures
defined under ASTM
 
standards including, but
 
not limited to; washability
 
(ASTM D4371); ash
(ASTM
 
D3174);
 
sulfur
 
(ASTM
 
D4239);
 
Btu/lb.
 
(ASTM
 
D5865);
 
volatile
 
matter
 
(ASTM
D3175); Free Swell Index (
FSI
) (ASTM D720).
10.4
 
Relevant Results
No critical factors have been found
 
that would adversely affect the recovery
 
of the Reserve.
 
Any quality
 
issues that
 
occur, either localized
 
or generally
 
are accounted
 
for in
 
the Marketing
Study done for this TRS.
11
Mineral Resource Estimates
MM&A independently created
 
a geologic model
 
to define the
 
coal resources at
 
the Property.
 
Coal resources were estimated as of December 31, 2021.
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
25
11.1
 
Assumptions, Parameters and Methodology
Geological
 
data
 
was
 
imported
 
into
 
Carlson
 
Mining
®
 
(formerly
 
SurvCADD
®
)
 
geological
modelling software in
 
the form of
 
Microsoft
®
 
Excel files incorporating,
 
drill hole collars,
 
seam
and thickness picks, bottom seam
 
elevations and raw and washed
 
coal quality.
 
These data
files were
 
validated prior
 
to importing
 
into the
 
software.
 
Once imported,
 
a geologic
 
model
was created, reviewed, and verified with a
 
key element being a gridded model
 
of coal seam
thickness.
 
Resource
 
tonnes
 
were
 
estimated
 
by
 
using
 
the
 
seam
 
thickness
 
grid
 
based
 
on
each valid point of observation and by defining resource
 
confidence arcs around the points
of
 
observation.
 
Points
 
of
 
observation
 
for
 
Measured
 
and
 
Indicated
 
confidence
 
arcs
 
were
defined for
 
all valid drill
 
holes that intersected
 
the seam
 
using standards deemed
 
acceptable
by MM&A based on a detailed geologic evaluation and a statistical analysis of all drill holes
within the
 
projected reserve
 
areas as
 
described in
Section 11.1.1
.
 
The geological
 
evaluation
incorporated an analysis
 
of seam thickness
 
related to depositional
 
environments, adjacent
roof and floor lithologies, and structural influences.
After
 
validating coal
 
seam data
 
and
 
establishing correlations,
 
the thickness
 
and
 
elevation
for seams of
 
economic interest were
 
used to generate
 
a geologic model.
 
Due to the
 
relative
structural simplicity
 
of the
 
deposits and
 
the reasonable
 
continuity of
 
the tabular
 
coal beds,
the principal geological interpretation necessary to define the geometry
 
of the coal deposits
is the proper
 
modeling of their
 
thickness and elevation.
 
Both coal thickness
 
and quality data
are
 
deemed
 
by
 
MM&A
 
to
 
be
 
reasonably
 
sufficient
 
within
 
the
 
resource
 
areas.
 
Therefore,
there
 
is
 
a
 
reasonable
 
level
 
of
 
confidence
 
in
 
the
 
geologic
 
interpretations
 
required
 
for
 
coal
resource determination based on the available data and the techniques
 
applied to the data.
Table 11
 
-1
 
below provides
 
the geological
 
mapping and
 
coal tonnage
 
estimation criteria
 
used
for
 
the
 
coal
 
resource
 
and
 
reserve
 
evaluation.
 
These
 
cut-off
 
parameters
 
have
 
been
developed by MM&A based on its experience with
 
the Coronado properties and are typical
of
 
mining
 
operations
 
in
 
the
 
Northern
 
Appalachian
 
Coal
 
Basin.
 
This
 
experience
 
includes
technical and
 
economic evaluations of
 
numerous properties in
 
the region
 
for the
 
purposes
of determining the economic viability of the subject coal reserves.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources
 
and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
26
Table 11
 
-1:
 
General Reserve and Resource Criteria
Item
Parameters
Technical Notes & Exceptions*
•
 
General Reserve Criteria
 
 
Reserve Classification
Reserve and Resource
Reliability Categories
Reserve (Proven and Probable)
To better reflect geological conditions of the coal
deposits, distance between points of observation
 
are
standard USGS (in meters), respectively, for
measured and indicated and inferred.
Effective Date of Resource
Estimate
December 31, 2021
Effective Date of Reserve
Estimate
December 31, 2021
Seam Density
Variable, dependent upon seam characteristics
(based on available drill hole quality).
 
In the
absence of laboratory data, estimated by (1)
assuming specific gravity of 1.30 for coal and
2.25 to 2.5 for rock parting, or (2) 1280
 
kg/m
3
to
1324 kg/m
3
 
for a "clean" seam)
•
 
Underground-Mineable Criteria
Map Thickness
Total seam thickness
Minimum Seam Thickness
1.2 meters (locally <1.2 m for limited areas
integral to the mine plan)
Pangburn was mapped at 0.92-meter cutoff in
conjunction with Coronado mine plan.
Minimum Mining Thickness
1.4 meters
Minimum In-Seam Wash
Recovery
40 percent
 
Wash Recovery Applied to
Coal Reserves
Based on average yield for drill holes within
reserve area, or in the absence of laboratory
washability data, based on estimated visual
recovery using specific gravities noted above and
95 percent yield on "clean" coal
Out-of-Seam Dilution
Thickness for Run-of-Mine
Tonnes Applied to Coal
Reserves
0.05 meters minimum
2243 kg/m³ density used for dilution tonnage
estimate
Mine Barrier
61-meter distance from abandoned mines and
sealed or pillared areas.
Adjustments Applied to Coal
Reserves
6 percent moisture increase; 5 percent
preparation plant inefficiency
Note:
 
Exceptions for application of these criteria
 
to resource and reserve estimation are
 
made as warranted and demonstrated by
 
either actual
mining experience or detailed data that
 
allows for empirical evaluation of mining conditions.
 
Final classification of coal reserve is made
based on the pre-feasibility evaluation.
11.1.1
 
Geostatistical Analysis
MM&A
 
completed
 
a
 
geostatistical
 
analysis
 
on
 
drill
 
holes
 
within
 
the reserve
 
boundaries
 
to
determine the applicability of the common United
 
States classification system for measured
and indicated and inferred coal
 
resources.
 
Historically, the United States has assumed that
coal
 
within
 
0.4-kilometers
 
of
 
a
 
point
 
of
 
observation
 
represents
 
a
 
measured
 
resource
whereas
 
coal
 
between
 
0.4
 
kilometers
 
and
 
1.2
 
kilometers
 
from
 
a
 
point
 
of
 
observation
 
is
classified as
 
indicated.
 
Inferred resources
 
are commonly assumed
 
to be
 
located between
1.2 kilometers
 
and 4.8
 
kilometers from
 
a point
 
of observation.
 
Per SEC
 
regulations, only
measured
 
and
 
indicated
 
resources
 
may
 
be
 
considered
 
for
 
reserve
 
classification,
respectively as proven and probable reserves.
MM&A
 
performed
 
a
 
geostatistical
 
analysis
 
test
 
of
 
the
 
Mon
 
Valley
 
data
 
set
 
using
 
the
 
Drill
Hole Spacing
 
Analysis (
DHSA
) method.
 
This method
 
attempts to
 
quantify the
 
uncertainty
of applying a measurement from a central location to increasingly larger square blocks and
provides recommendations for determining the distances between drill holes for measured,
indicated, and inferred resources.
 
 
ex964p2i0.jpg ex964p36i2.jpg ex964p36i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
27
To
 
perform
 
DHSA
 
the
 
data
 
set
 
was
 
processed
 
to
 
remove
 
any
 
erroneous
 
data
 
points,
clustered data
 
points, as
 
well as
 
directional trends.
 
This was
 
achieved through
 
the use of
histograms,
 
as
 
seen
 
in
Figure
 
11-1
,
 
color
 
coded
 
scatter
 
plots
 
showing
 
the
 
geospatial
positioning of the borings,
Figure 11-2
, and trend analysis.
Figure 11-1: Histogram of the Total Seam
Thickness for the Upper Freeport Seam
Present in the Mon Valley Complex
Figure 11-2: Scatter plot of the Total Seam
Thickness for the Upper Freeport Seam
Present in the Mon Valley Complex
Following the
 
completion of
 
data processing,
 
a variogram
 
of the
 
data set
 
was created,
Figure
11
-3
.
 
The
 
variogram
 
plots
 
average
 
square
 
difference
 
against
 
the
 
separation
 
distance
between the data pairs.
 
The separation distance is broken
 
up into separate bins defined
 
by
a
 
uniform
 
lag
 
distance
 
(e.g.,
 
for
 
a
 
lag
 
distance
 
of
 
152
 
meters
 
the
 
bins
 
would
 
be
 
0
 
–
 
152
meters, 153 –
 
305 meters, etc.).
 
Each pair of
 
data points that
 
are less than
 
one lag distance
apart are reported
 
in the first bin.
 
If the data pair
 
is further apart
 
than one lag distance
 
but
less
 
than
 
two
 
lag
 
distances
 
apart,
 
then
 
the
 
variance
 
is
 
reported
 
in
 
the
 
second
 
bin.
 
The
numerical
 
average
 
for
 
differences
 
reported
 
for each
 
bin
 
is
 
then
 
plotted
 
on
 
the
 
variogram.
 
Care was taken to define the lag distance in such a way as to not
 
overestimate any nugget
effect
 
present
 
in
 
the
 
data
 
set.
 
Lastly,
 
modeled
 
equations,
 
often
 
spherical,
 
gaussian,
 
or
exponential,
 
are
 
applied
 
to
 
the
 
variogram
 
in
 
order
 
to
 
represent
 
the
 
data
 
set
 
across
 
a
continuous spectrum.
 
 
ex964p2i0.jpg ex964p37i1.jpg
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
28
Figure 11-3:
 
Variogram of the Total Seam Thickness for the Upper Freeport Seam
 
Present in the Mon Valley Complex
The estimation
 
variance is
 
then calculated
 
using information
 
from the
 
modeled
 
variogram
as
 
well
 
as
 
charts
 
published
 
by
 
Journel
 
and
 
Huijbregts
 
(1978)
.
 
This
 
value
 
estimates
 
the
variance from
 
applying a single
 
central measurement to
 
increasingly larger square
 
blocks.
 
Care was
 
taken to
 
ensure any
 
nugget effect
 
present
 
was added
 
back into
 
the data.
 
This
process was repeated for each test block size.
The final step of
 
the process is to
 
calculate the global estimation
 
variance.
 
In this step the
number square
 
blocks that
 
would fit
 
inside the
 
selected study
 
area is
 
determined for
 
each
block size
 
that was
 
investigated in
 
the previous
 
step.
 
The estimation
 
variance is
 
then divided
by
 
the
 
number
 
of
 
blocks
 
that
 
would
 
fit
 
inside
 
the
 
study
 
area
 
for
 
each
 
test
 
block
 
size.
 
Following
 
this
 
determination,
 
the
 
data
 
is
 
then
 
transformed
 
back
 
to
 
represent
 
the
 
relative
error in the 95
th
-percentile range.
Figure 11
 
-4
shows the
 
results of
 
the DHSA
 
performed on
 
the Upper
 
Freeport data
 
for the
Mon Valley Complex.
 
DHSA provides hole to hole spacing values, these
 
distances need to
be converted to
 
radius from a
 
central point in
 
order to compare
 
to the historical
 
standards.
 
A
 
summary
 
of
 
the
 
radius
 
data
 
is
 
shown
 
in
Table
 
11-2
.
 
DHSA
 
prescribes
 
measured,
indicated, and inferred drill hole spacings be determined at the 10-percent, 20-percent, and
50-percent levels of relative error, respectively.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex964p38i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
29
Figure 11-4:
 
Result of DHSA for the Upper Freeport Seam Present
 
in the Mon Valley
Complex
Table 11
 
-2:
 
DHSA Results Summary for Radius from a Central
 
Point
Model:
Measured Radial Distance
(10% Relative Error)
Indicated Radial
Distance
(20% Relative Error)
Inferred Radial
Distance
(50% Relative Error)
(km)
(km)
(km)
Gaussian:
0.72
1.42
3.53
Spherical:
0.72
1.42
3.53
Exponential:
0.75
1.43
3.49
Comparing the results
 
of the DHSA
 
to the historical
 
standards, it is
 
evident that the
 
historical
standards
 
are
 
more
 
conservative
 
than
 
even
 
the
 
most
 
conservative
 
DHSA
 
model
 
with
regards
 
to
 
determining
 
measured
 
resources.
 
The
 
Gaussian
 
and
 
Spherical
 
models
recommend
 
using
 
a
 
radius
 
of
 
0.72
 
kilometers
 
for
 
measured
 
resources
 
compared
 
to
 
the
historical value of 0.4 kilometers.
 
With respect to indicated resources the
 
DHSA falls in line
closely with the historical standards.
 
The Exponential model recommends
 
using a radius of
1.43
 
kilometers,
 
while
 
the
 
Spherical
 
and
 
Gaussian
 
models
 
recommend
 
a
 
radius
 
of
 
1.42
kilometers,
 
respectively.
 
These
 
values
 
line
 
up
 
closely
 
with
 
the
 
historical
 
radius
 
of
 
1.2
kilometers.
 
These
 
results
 
have
 
led
 
the
 
QPs
 
to
 
report
 
the
 
data
 
following
 
the
 
historical
classification standards, rather than use the results of the DHSA.
11.2
 
Qualified Person’s Estimates
Mineral resources, representing
 
in-situ coal in
 
which a portion
 
of reserves are
 
derived, are
presented
 
below.
 
Based
 
on
 
the
 
work
 
described
 
and
 
detailed
 
modelling
 
of
 
the
 
areas
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
30
considering all the parameters defined, a
 
coal resource estimate, summarized in
Table
 
11-
3
, was prepared as of December 31, 2021, for property controlled by Coronado.
Table 11
 
-3:
 
Coal Resources Summary as of December 31, 2021
 
Coal Resource (Dry Tonnes, In Situ, Mt)
Resource Quality (Dry)
Area
Measured
Indicated
Inferred
Total
Ash%
Sulfur%
VM%
Inclusive of Reserve
291.0
213.5
9.3
513.8
31
1.4
26
Exclusive of Reserve
0.0
0.0
0.0
0.0
Total 12/31/2021
291.0
213.5
9.3
513.8
Note:
 
Resource tonnes are inclusive of reserve
 
tonnes since they include the in-situ tonnes from
 
which recoverable coal reserves
are derived.
Note 2:
 
Coal resources are reported on a dry basis.
 
Surface moisture and inherent moisture are excluded.
Note 3: The Mon Valley properties do not have any resource
 
tonnes exclusive of reserves as of December
 
31, 2021.
11.3
 
Qualified Person’s Opinion
While
 
there
 
is
 
some
 
level
 
of
 
stratigraphically
 
controlled
 
seam-thickness
 
variability
 
due
 
to
sand
 
channels,
 
etc.,
 
the
 
Upper
 
Freeport
 
coal
 
seam
 
on
 
the
 
mine
 
property
 
at
 
Mon
 
Valley
demonstrate
 
reasonable
 
thickness
 
consistency
 
according
 
to
 
the
 
classification
 
system
 
of
measured
 
(0 kilometers – 0.4 kilometers),
indicated
 
(0.4 kilometers to 1.2 kilometers),
 
and
inferred
 
(1.2 kilometers
 
to 4.8
 
kilometers).
 
MM&A geologists
 
and engineers
 
modeled the
deposit
 
and
 
delineated
 
mineable
 
regions
 
to
 
reflect
 
the
 
nature
 
of
 
each
 
seam
 
and
 
the
practicality
 
of
 
mining
 
constraints.
 
Based
 
on
 
MM&A’s
 
geostatistical
 
analysis,
 
it
 
would
 
be
possible
 
to
 
extend
 
the
 
measured,
 
indicated
 
and
 
inferred
 
arcs
 
slightly
 
beyond
 
historically
accepted practices due to
 
consistent geological settings.
 
The QPs have again
 
elected not
to extend arc distances, introducing a level
 
of conservatism in measured and indicated coal
classification.
Based
 
on
 
the
 
data
 
review,
 
the
 
attendant
 
work
 
done
 
to
 
verify
 
the
 
data
 
integrity
 
and
 
the
creation
 
of
 
an
 
independent
 
geologic
 
model,
 
the
 
QPs
 
believe
 
this
 
is
 
a
 
fair
 
and
 
accurate
representation of the Mon Valley
 
coal resources.
12
Mineral Reserve Estimates
12.1
 
Assumptions, Parameters and Methodology
Coal Reserves
 
are classified
 
as
proven
 
or
probable
 
considering “modifying
 
factors” including
mining, metallurgical, economic, marketing, legal, environmental, social, and governmental
factors.
>
Proven Coal Reserves
 
are the economically mineable part of a measured coal
resource, adjusted for diluting materials and allowances for losses when the material is
mined.
 
It is based on appropriate assessment and studies in consideration of and
adjusted for reasonably assumed modifying factors.
 
These assessments demonstrate
that extraction could be reasonably justified at the time of reporting.
 
>
Probable Coal Reserves
 
are the economically mineable part of an indicated coal
resource, and in some circumstances a measured coal resource, adjusted for diluting
materials and allowances for losses when the material is mined.
 
It is based on
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
31
appropriate assessment and studies in consideration of and adjusted for reasonably
assumed modifying factors.
 
These assessments demonstrate that extraction could be
reasonably justified at the time of reporting.
Upon completion of delineation and calculation of coal resources, MM&A generated a LOM
plan for each of the
 
projected mines within the Mon
 
Valley
 
Complex.
 
The footprint of each
reserve area is shown on the maps
 
in
Appendix B
.
 
The mine plans were generated based
on
 
the
 
forecast
 
mine
 
plan
 
and
 
permit
 
plan
 
provided
 
by
 
Coronado
 
with
 
modifications
 
by
MM&A
 
where
 
necessary
 
due
 
to
 
current
 
property
 
control
 
limits,
 
modifications
 
to
 
geologic
mapping, or other factors determined during the evaluation.
Carlson Mining software
 
was used to
 
generate the LOM
 
plan for Mon
 
Valley.
 
The mine plan
was sequenced
 
based on
 
productivity schedules
 
provided by
 
Coronado.
 
MM&A determined
the
 
productivity
 
estimates
 
and
 
plans
 
to
 
be
 
reasonable
 
based
 
on
 
experience
 
and
 
current
industry practice.
At the Mon Valley mines, a minimum mining
 
height of 1.4 meters was
 
generally used due to
the continuous mining method being
 
employed; however, Pangburn was mapped at a
 
0.92-
meter cutoff
 
in conjunction with
 
the Coronado mine
 
plan.
 
For coal seams
 
thinner than the
assigned mining height, the
 
difference between the
 
coal seam height and
 
assigned mining
height consists of
 
out-of-seam dilution (
OSD
).
 
Mine recovery generally
 
varies between 40
percent
 
and
 
55
 
percent
 
for
 
continuous
 
mining
 
panels.
 
Plant
 
recovery
 
is
 
a
 
function
 
of
 
in-
seam recovery,
 
OSD and
 
plant efficiency
 
factor,
 
which is
 
set at
 
95 percent.
 
Typical
 
entry
width is 5.8 meters.
Raw,
 
ROM
 
production
 
data
 
outputs
 
from
 
LOM
 
plan
 
sequencing
 
were
 
processed
 
into
Microsoft
®
 
EXCEL
 
spreadsheets and
 
summarized on
 
an
 
annual basis
 
for
 
processing
 
into
the economic model.
 
Average seam densities
 
were estimated to
 
determine raw
 
coal tonnes
produced
 
from
 
the
 
LOM
 
plan.
 
Average
 
mine
 
recovery
 
and
 
wash
 
recovery
 
factors
 
were
applied to determine coal reserve tonnes.
 
Coal reserve tonnes in this evaluation are reported at a 6.0 percent moisture and represent
the saleable product from the Property.
 
Pricing
 
data
 
as
 
provided
 
by
 
Coronado
 
is
 
described
 
in
Section
 
16.2
.
 
The
 
pricing
 
data
assumes HVB domestic
 
and export FOB-mine
 
prices of approximately
 
$137 and $120
 
per
metric tonne for
 
calendar year 2027.
 
HVB domestic and
 
export prices respectively
 
increase
to approximately $221
 
and $193 per
 
metric tonne through
 
year 2050, and
 
then increased by
1% annual inflation thereafter.
The coal resource mapping and estimation process, described in the report, was used as a
basis for the coal
 
reserve estimate.
 
Proven and probable coal
 
reserves were derived from
the
 
defined
 
coal
 
resource
 
considering
 
relevant
 
processing,
 
economic
 
(including
 
technical
estimates of
 
capital, revenue,
 
and cost),
 
marketing, legal,
 
environmental, socio-economic,
and regulatory factors and are presented on a moist, recoverable basis.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
32
As is customary
 
in the
 
USA, the categories
 
for proven
 
and probable
 
coal reserves
 
are based
on the distances
 
from valid points
 
of measurement as
 
determined by the
 
QPs for the
 
area
under
 
consideration.
 
For
 
this
 
evaluation,
 
measured
 
resource,
 
which
 
may
 
convert
 
to
 
a
proven reserve, is based on a 0.4-kilometer radius from a valid point of observation.
Points of observation include exploration drill holes,
 
degas holes, and mine measurements
which have been
 
fully vetted and
 
processed into a
 
geologic model.
 
The geologic model
 
is
based
 
on
 
seam
 
depositional
 
modeling,
 
the
 
interrelationship
 
of
 
overlying
 
and
 
underlying
strata
 
on
 
seam
 
mineability,
 
seam
 
thickness
 
trends,
 
the
 
impact
 
of
 
seam
 
structure
 
(i.e.,
faulting),
 
intra-seam
 
characteristics,
 
etc.
 
Once
 
the
 
geologic
 
model
 
was
 
completed,
 
a
statistical analysis,
 
described in
Section 11.1.1
 
was conducted
 
and a
 
0.4-kilometer radius
from a valid point of observation was selected to define Measured Resources.
 
Likewise,
 
the
 
distance
 
between
 
0.4
 
and
 
1.2
 
of
 
a
 
kilometer
 
radius
 
was
 
selected
 
to
 
define
Indicated Resources.
 
Indicated Resources may convert to Probable Reserves
 
Inferred
 
Resources (greater
 
than a
 
1.2-kilometer
 
radius from
 
a
 
valid point
 
of observation)
are to be excluded from Reserve consideration.
12.2
 
Qualified Person’s Estimates
Reserve
 
tonnage
 
estimates
 
provided
 
herein
 
report
 
coal
 
reserves
 
derived
 
from
 
the
 
in-situ
resource tons presented in
Table 11
 
-3
, and not
 
in addition to coal
 
resources.
 
Coal reserves
are
 
presented
 
on
 
a
 
ROM
 
basis
 
in
Table
 
12-1
.
 
Proven
 
and
 
probable
 
coal
 
reserves
 
were
derived
 
from
 
the
 
defined
 
coal
 
resource
 
considering
 
relevant
 
mining,
 
processing,
infrastructure, economic
 
(including estimates
 
of capital,
 
revenue, and
 
cost), marketing,
 
legal,
environmental,
 
socio-economic
 
and
 
regulatory
 
factors.
 
The
 
coal
 
reserves,
 
as
 
shown
 
in
Table
 
12-2
, are based on a technical evaluation of
 
the geology and a preliminary feasibility
study of
 
the coal
 
deposits.
 
The extent
 
to which
 
the coal
 
reserves may
 
be affected
 
by any
known environmental,
 
permitting, legal,
 
title, socio-economic,
 
marketing, political,
 
or other
relevant issues has
 
been reviewed rigorously.
 
Similarly,
 
the extent to
 
which the estimates
of coal reserves
 
may be materially
 
affected by mining,
 
metallurgical, infrastructure and
 
other
relevant factors has also been considered.
Table 12-1:
 
Coal Summary (ROM Basis (Moist)) as of December 31,
 
2021 (Mt)
 
Demonstrated Coal Reserves (Mt, Moist ROM)
 
 
 
 
By Reliability Category
By Mining Type
By Control Type
Quality (Dry)
Area /
Mine
Proved
Probable
Total
Surface
UG
Owned
Leased
Ash
Sulfur
Vol
Mon Valley
113.9
83.2
197.1
0.0
197.1
195.7
1.4
37
1.4
23
Table 12-2:
 
Coal Reserves Summary (Marketable Sales Basis) as of
 
December 31, 2021 (Mt)
 
Demonstrated Coal Reserves (Wet Tons, Washed or Direct Shipped, Mt)
Quality (Dry Basis)
 
By Reliability Category
By Mining Type
By Control Type
Property
Proven
Probable
Total
Surface
UG
Owned
Leased
Ash%
Sulfur%
VM%
Mon Valley
77.8
56.6
134.4
0.0
134.4
133.4
1.0
8
1.4
35
 
Note: Marketable reserve tonnes are reported
 
on a moist basis, including a combination of
 
surface and inherent moisture.
 
The
combination of surface and inherent moisture is
 
modeled at 6-percent.
 
Actual product moisture is dependent upon
 
multiple
 
 
ex964p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
33
geological factors, operational factors, and product
 
contract specifications and can exceed 8-percent.
 
As such, the modeled
moisture values provide a level of conservatism
 
for reserve reporting.
The results
 
of this
 
TRS define
 
an estimated
 
134.4 Mt
 
of proven
 
and probable
 
marketable
coal reserves.
 
Of that total,
 
58 percent are
 
proven, and 42 percent
 
are probable.
 
There are
133.4 Mt of owned coal reserves and 1.0 Mt of
 
leased coal reserves.
 
All of the Mon Valley
reserves
 
are
 
considered
 
to
 
be
 
suitable
 
for
 
the
 
metallurgical
 
coal
 
market.
 
All
 
of
 
the
 
Mon
Valley reserves are unassigned.
12.3
 
Qualified Person’s Opinion
The
 
estimate of
 
coal
 
reserves was
 
determined
 
in accordance
 
with the
 
JORC Code
 
along
with SEC Regulation S-K 1300.
The LOM
 
mining plans for
 
Mon Valley
 
were prepared
 
to the level
 
of preliminary
 
feasibility.
 
Mine projections were prepared, and timing scheduled
 
to match production with coal seam
characteristics.
 
Production timing was carried out from current locations to depletion of the
coal reserve
 
area.
 
Coal reserve
 
estimates could
 
be materially
 
affected by
 
the risk
 
factors
described in
Section 22.2
.
Based
 
on the
 
Preliminary Feasibility
 
Study
 
and
 
the attendant
 
Economic Review,
 
the QPs
believe this is a fair and accurate calculation of the Mon Valley coal reserves.
13
Mining Methods
Three separate
 
underground mine
 
areas were
 
modeled and
 
tested economically
 
for the
 
Mon
Valley
 
Complex.
 
Once the Resources were calculated, mine plans were
 
created to project
operating each resource area to
 
depletion, with crews and
 
equipment scheduled to move to
subsequent mining areas as depletion occurs.
 
Underground mine operations are projected
to be exhausted in 2099.
13.1
 
Geotech and Hydrology
Mining
 
plans
 
for
 
potential
 
underground
 
mines
 
were
 
developed
 
by
 
Coronado
 
and
 
MM&A.
 
Pillar
 
stability
 
was
 
tested
 
by
 
MM&A
 
using
 
the
Analysis
 
of
 
Coal
 
Pillar
 
Stability
 
(ACPS)
program that
 
was developed
 
by the
National Institute
 
for Occupational
 
Safety and
 
Health
(
NIOSH
)
.
 
MM&A reviewed the results from the ACPS analysis and considered
 
them in the
development of the LOM plan.
Hydrology is not
 
expected to be
 
an issue of
 
concern at Mon
 
Valley.
 
Extensive mining has
occurred in the Pittsburgh
 
seam, 183 meters above
 
the Upper Freeport
 
horizon.
 
The Upper
Freeport
 
coal
 
has
 
been
 
mined
 
in
 
the
 
region—based
 
on
 
successful
 
historical
 
mining
 
in
comparable geologic
 
settings, material
 
impacts related
 
to hydrology
 
are not
 
anticipated to
be of concern.
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
34
13.2
 
Production Rates
The Mon Valley
 
Complex is not yet
 
active, with three distinct
 
mines and preparation plants
planned.
 
The
 
mine
 
plan
 
and
 
productivity
 
expectations
 
reflect
 
historical
 
performance
 
of
similar operations and efforts have
 
been made to adjust
 
the plan to reflect
 
future conditions.
 
MM&A is
 
confident that
 
the mine
 
plan is
 
reasonably representative
 
to provide
 
an accurate
estimation of
 
coal reserves.
 
Mine development
 
and operation
 
has not
 
been optimized within
the TRS.
Production is
 
scheduled for
 
approximately 273
 
days each
 
year, which represents production
on Monday through
 
Friday plus every
 
other Saturday with
 
allowances for holidays.
 
On each
day, the continuous mining sections produce
 
coal on two shifts;
 
the third shift is
 
reserved for
maintenance and mine
 
conveyor belt and
 
power moves.
 
The sections are configured
 
as full
super sections
 
with two continuous
 
miners per section.
 
Productivity is planned
 
at the
 
rate
of 272 meters of advance per shift for the super sections.
Carlson Mining
 
software was
 
used by
 
MM&A to
 
generate mine
 
plans for
 
the underground
mineable coal
 
seam.
 
Mine plans
 
were sequenced
 
based on
 
productivity schedules
 
provided
by Coronado, which were based on
 
historically achieved productivity levels.
 
All production
forecasting ties assumed production rates to geological models
 
as constructed by MM&A’s
team of geologists and mining engineers.
As shown in
Table 13-1
, the areas planned for underground mines produce coal until 2099.
 
Clean coal production varies directly with coal thickness.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
35
Table 13-1:
 
Production Summary by Mine by Year (000)
Mine Name
2030
2031
2032
2033
2034
2035
2036
2037
Pangburn
0
440
1,995
2,067
2,158
2,237
2,238
1,868
Fallowfield
0
0
0
0
0
0
0
0
Shaner
0
0
0
0
0
0
0
404
 
Total
0
440
1,995
2,067
2,158
2,237
2,238
2,273
 
 
 
 
 
 
 
 
 
Mine Name
2038
2039
2040
2041
2042
2043
2044
2045
Pangburn
1,476
702
665
0
0
0
0
0
Fallowfield
0
0
0
0
0
0
0
0
Shaner
684
1,240
1,944
1,989
1,901
1,892
1,809
1,895
 
Total
2,160
1,943
2,608
1,989
1,901
1,892
1,809
1,895
 
 
 
 
 
 
 
 
 
Mine Name
2046
2047
2048
2049
2050
2051
2052
2053
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
0
0
0
0
0
0
0
0
Shaner
1,826
1,744
1,879
1,825
1,909
1,876
1,759
1,810
 
Total
1,826
1,744
1,879
1,825
1,909
1,876
1,759
1,810
 
 
 
 
 
 
 
 
 
Mine Name
2054
2055
2056
2057
2058
2059
2060
2061
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
0
0
947
1,962
2,215
2,212
2,191
2,000
Shaner
1,929
1,930
1,929
1,980
1,899
2,028
1,957
1,845
 
Total
1,929
1,930
2,876
3,942
4,114
4,239
4,147
3,844
 
 
 
 
 
 
 
 
 
Mine Name
2062
2063
2064
2065
2066
2067
2068
2069
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
1,827
2,051
2,087
2,087
2,060
2,060
1,881
2,087
Shaner
1,910
1,770
1,658
1,176
1,055
672
674
436
 
Total
3,737
3,821
3,745
3,264
3,115
2,732
2,555
2,523
 
 
 
 
 
 
 
 
 
Mine Name
2070
2071
2072
2073
2074
2075
2076
2077
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
1,585
2,191
2,197
2,008
2,098
2,055
2,107
1,883
Shaner
0
0
0
0
0
0
0
0
 
Total
1,585
2,191
2,197
2,008
2,098
2,055
2,107
1,883
 
 
 
 
 
 
 
 
 
Mine Name
2078
2079
2080
2081
2082
2083
2084
2085
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
2,129
1,937
1,723
2,242
1,568
2,285
1,637
1,982
Shaner
0
0
0
0
0
0
0
0
 
Total
2,129
1,937
1,723
2,242
1,568
2,285
1,637
1,982
 
 
 
 
 
 
 
 
 
Mine Name
2086
2087
2088
2089
2090
2091
2092
2093
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
1,477
1,857
1,616
1,993
1,305
1,637
1,612
1,747
Shaner
0
0
0
0
0
0
0
0
 
Total
1,477
1,857
1,616
1,993
1,305
1,637
1,612
1,747
 
 
 
 
 
 
 
 
 
Mine Name
2094
2095
2096
2097
2098
2099
2100
2101
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
1,355
1,731
1,752
1,387
916
393
0
0
Shaner
0
0
0
0
0
0
0
0
 
Total
1,355
1,731
1,752
1,387
916
393
0
0
13.3
 
Mining Related Requirements
A mine
 
plan with
 
sequenced mining
 
projections was prepared
 
for each logical
 
mining unit.
 
For each mine plan, the appropriate number of production units is
 
selected for the resource
area,
 
and
 
a
 
productivity
 
level
 
assigned,
 
expressed
 
in
 
meters
 
of
 
advance
 
per
 
unit-shift
 
of
production.
 
The productivity
 
is based on
 
the equipment
 
and personnel
 
configuration, mining
height and expected physical conditions.
 
 
ex964p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
36
13.4
 
Required Equipment and Personnel
Production from the proposed Mon
 
Valley Complex mines will be conducted using the
 
room
and pillar
 
method, utilizing
 
continuous miners
 
and haulage
 
using shuttle
 
cars to
 
a feeder-
breaker located
 
at the
 
tail of
 
the section
 
conveyor belt.
 
The feeder-breaker
 
crushes large
pieces
 
of
 
coal
 
and
 
rock
 
and
 
regulates
 
coal
 
feed
 
onto
 
the
 
mine
 
conveyor.
 
Roof-bolting
machines are
 
used for
 
to support
 
the roof
 
on the
 
continuous miner
 
sections.
 
Roof-bolting
machines are used
 
to install roof
 
bolts, and battery
 
scoops are available
 
to clean the
 
mine
entries
 
and
 
assist
 
in
 
delivery
 
of
 
mine
 
supplies
 
to
 
work
 
areas.
 
Other
 
supplemental
equipment, such as personnel carriers, supply vehicles, etc., are also used daily.
Mine conveyors typically range in width
 
up to 1.5 meters.
 
Multiple belt flights are arranged
in
 
series
 
to
 
deliver
 
raw
 
coal
 
to
 
the
 
underground
 
storage.
 
Along
 
the
 
main
 
and
 
sub-main
entries
 
and
 
panels,
 
a
 
travel
 
way
 
is
 
provided
 
for
 
personnel
 
and
 
materials
 
by
 
rubber-tired
equipment or on rail.
 
The Mon Valley mines will use conveyors to transport ROM coal from
the
 
underground
 
production
 
sections
 
to
 
the
 
surface
 
where
 
the
 
coal
 
may
 
be
 
sampled,
crushed, washed in the preparation plant, and stockpiled to await shipment.
 
Surface
 
ventilation
 
fans
 
are
 
installed
 
as
 
needed
 
to
 
provide
 
a
 
sufficient
 
volume
 
of
 
air
 
to
ventilate production sections, coal haulage and transport entries,
 
battery charging stations,
and
 
transformers
 
in
 
accordance
 
with
 
approved
 
plans.
 
High-voltage
 
cables
 
deliver
 
power
throughout
 
the
 
mine
 
where
 
transformers
 
reduce
 
voltage
 
for
 
specific
 
equipment
requirements.
 
The Mine Improvement and
 
New Emergency Response
 
Act of 2006
 
(
MINER
Act
)
 
requires
 
that
 
carbon
 
monoxide
 
detection
 
systems
 
be
 
installed
 
along
 
mine
 
conveyor
belts
 
and
 
that
 
electronic
 
two-way
 
tracking
 
and
 
communications
 
systems
 
be
 
installed
throughout underground mines.
 
Water is required to
 
control dust
 
at production sections
 
and
along conveyor
 
belts, and
 
to cool
 
electric motors.
 
Water is
 
available from
 
nearby sources
and is distributed within the mine by pipelines as required.
13.4.1
 
Mine:
 
Pangburn
The Pangburn mine is
 
proposed to start in
 
2031 with three
 
continuous mining sections.
 
The
Upper Freeport
 
seam will
 
be accessed
 
via decline
 
slope and
 
vertical shaft.
 
This mine
 
will
produce metallurgical and steam coal from leased and owned mineral.
Production is
 
scheduled for
 
approximately 273
 
days each
 
year, which represents production
on
 
Monday
 
through
 
Friday
 
and
 
every
 
other
 
Saturday.
 
On
 
each
 
day,
 
three
 
production
sections
 
are
 
scheduled
 
to
 
produce
 
coal
 
on
 
two
 
shifts;
 
the
 
third
 
shift
 
is
 
reserved
 
for
maintenance and mine conveyor belt
 
and power moves.
 
Each section is configured as full
supersection with
 
two continuous
 
miners available
 
for production.
 
Productivity is
 
planned
at
 
the
 
rate
 
of
 
272
 
meters
 
of
 
advance
 
per
 
shift
 
for
 
the
 
super
 
sections.
 
A
 
total
 
of
 
203
employees are assigned to the mine.
Principal production
 
equipment on
 
each section
 
includes two
 
continuous miners,
 
two roof
bolters, four shuttle
 
cars, and two
 
scoops.
 
Coal is extracted
 
from the production
 
face with
the continuous miner and hauled
 
to the mine conveyor
 
in shuttle cars.
 
At the conveyor belt,
the
 
coal
 
is
 
discharged
 
from
 
the
 
shuttle
 
cars
 
onto
 
a
 
feeder
 
breaker
 
for
 
transfer
 
onto
 
the
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
37
conveyor.
 
The conveyors carry the coal to the outside, where it is transported via overland
conveyor
 
to
 
the
 
proposed
 
Pangburn
 
preparation
 
plant
 
and
 
barge
 
load-out
 
on
 
the
Monongahela River.
 
Rail access is provided by a
CSX rail line.
The
 
proposed
 
Pangburn
 
mine
 
will
 
be
 
located
 
approximately
 
1.6
 
kilometers
 
south
 
of
 
the
community of
 
Elizabeth, Pennsylvania.
 
Main paved
 
roads exist
 
both east
 
and west
 
of the
site.
 
The proposed
 
dock, located
 
on the
 
western boundary
 
of the
 
proposed Pangburn
 
permit
area, is currently used for bulk material transshipment.
 
The area has hosted both industrial
and
 
residential development
 
for an
 
extensive time
 
period.
 
No
 
extraordinary
 
measures or
expenses will be required to establish infrastructure or utilities at the Pangburn site.
 
The preliminary design for the Pangburn mine surface facilities was provided by Coronado.
 
The
 
facilities
 
include
 
offices,
 
warehouses,
 
shops,
 
and
 
a
 
bathhouse
 
for
 
personnel;
 
a
preparation
 
plant
 
to
 
process
 
ROM
 
coal;
 
a
 
refuse
 
area
 
with
 
a
 
designed
 
capacity
 
of
approximately 35 million refuse tonnes; raw coal storage at the
 
plant totaling approximated
100,000
 
tonnes, clean
 
coal
 
storage at
 
the plant
 
site of
 
approximately 54,000
 
tonnes, and
three clean coal stockpiles
 
adjacent to the dock
 
loading facility on the
 
Monongahela River.
 
The three river stockpiles have a designed capacity of approximately 266,000 tonnes.
A
 
study
 
completed
 
and
 
approved
 
through
 
the
Pennsylvania
 
Department
 
of
Environmental Protection
 
on behalf of Coronado has identified
 
a Preferred Site for refuse
disposal
 
at
 
Pangburn
 
with
 
capacity
 
of
 
22.6
 
million
 
cubic
 
meters.
 
MM&A’s
 
estimated
requirements
 
for
 
Pangburn and
 
Shaner
 
combined is
 
29.7 million
 
tonnes or
 
approximately
13.2 million cubic meters.
The preliminary design layout of the Pangburn facilities is shown
Figure 13-1
.
 
 
ex964p47i0.jpg
 
ex964p47i1.jpg
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
38
Figure 13-1:
 
Proposed Pangburn Plant and Mine Site Infrastructure
13.4.2
 
Mine: Shaner
The Shaner mine is
 
a proposed mine in
 
the Upper Freeport seam
 
and is scheduled to
 
begin
production in
 
2037 as
 
the Pangburn
 
reserve is
 
depleted.
 
This mine
 
is a
 
metallurgical and
steam coal operation on leased and owned mineral property.
Production is
 
scheduled for
 
approximately 273
 
days each
 
year, which represents production
on
 
Monday
 
through
 
Friday
 
and
 
every
 
other
 
Saturday.
 
On
 
each
 
day,
 
three
 
production
sections
 
are
 
scheduled
 
to
 
produce
 
coal
 
on
 
two
 
shifts;
 
the
 
third
 
shift
 
is
 
reserved
 
for
maintenance
 
and mine
 
conveyor belt
 
and
 
power moves.
 
All three
 
sections
 
are full
 
super
sections with two continuous
 
miners per section.
 
Productivity is planned at
 
the rate of 272
meters of advance per
 
shift for the
 
super sections.
 
A total of 203
 
employees are assigned
to the mine.
Principal production
 
equipment per
 
section includes
 
two continuous
 
miners, two
 
roof bolters,
four
 
shuttle
 
cars,
 
and
 
two
 
scoops.
 
Coal
 
is
 
extracted
 
from
 
the
 
production
 
face
 
with
 
the
 
 
ex964p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
39
continuous miner and hauled to
 
the mine conveyor in
 
shuttle cars.
 
At the conveyor belt, the
coal
 
is
 
discharged
 
onto
 
a
 
feeder
 
breaker
 
for
 
transfer
 
onto
 
the
 
conveyor.
 
The
 
conveyors
carry the coal to the outside and to the preparation plant and load-out.
The
 
Shaner
 
mine
 
will
 
be
 
located
 
approximately
 
1.6
 
kilometers
 
north
 
of
 
the
 
community
 
of
Sutersville, Pennsylvania,
 
between the
 
Youghiogheny and Monongahela Rivers.
 
Numerous
improved
 
roads
 
traverse
 
the
 
Property.
 
An
 
additional
 
shaft
 
and
 
slope
 
will
 
be
 
required
 
to
access
 
Upper
 
Freeport
 
seam
 
reserves
 
west
 
of
 
the
 
Monongahela
 
River,
 
accessed
 
across
the
 
1
st
 
Street
 
bridge
 
and
 
Douglass
 
Run
 
Road.
 
The
 
immediate
 
vicinity
 
of
 
the
 
proposed
Shaner surface facilities
 
is well developed;
 
no extraordinary measures
 
or expenses will
 
be
required to
 
establish infrastructure
 
or utilities
 
at the
 
Fallowfield site.
 
Due to
 
the projected
starting
 
date
 
for
 
the Shaner
 
mine,
 
no detailed
 
design
 
of
 
infrastructure
 
or surface
 
facilities
has been
 
completed to
 
date.
 
The proposed
 
mines
 
are located
 
in the
 
Appalachian Basin,
which has an extensive history (>100 years)
 
of coal mining.
 
There is a sufficient population
base within commuting
 
distance of the
 
proposed operations; no
 
Camp or Town construction
will
 
be
 
required.
 
Mine
 
opening
 
capital
 
expenditures
 
are
 
included
 
in
 
the
 
MM&A
 
financial
model.
Due to the projected start-up date of the Shaner mine, no permit
 
work has been completed
to date.
 
The proposed
 
mine
 
is located
 
in an
 
area with
 
a long
 
history of
 
coal mining,
 
with
numerous
 
permitted
 
operations
 
in
 
close
 
proximity.
 
Coal
 
mining
 
permits
 
are
 
routinely
obtained
 
in
 
this
 
region;
 
a
 
2-year
 
to
 
3-year
 
lead
 
time
 
is
 
recommended.
 
Estimated
expenditures for
 
mine closure
 
and site
 
reclamation are
 
included in
 
the financial
 
model for
each mine or plant site.
Infrastructure for Shaner will resemble that shown in
Figure 13-1
 
for Pangburn.
13.4.3
 
Mine: Fallowfield
The Fallowfield mine is
 
proposed to start in
 
2056 with three
 
production sections.
 
The Upper
Freeport seam
 
will be accessed
 
via a decline
 
slope and
 
vertical shaft.
 
This mine will
 
be a
metallurgical coal and steam coal operation on leased and owned mineral property.
Production is
 
scheduled for
 
approximately 273
 
days each
 
year, which represents production
on
 
Monday
 
through
 
Friday
 
and
 
every
 
other
 
Saturday.
 
On
 
each
 
day,
 
three
 
production
sections
 
are
 
scheduled
 
to
 
produce
 
coal
 
on
 
two
 
shifts;
 
the
 
third
 
shift
 
is
 
reserved
 
for
maintenance
 
and mine
 
conveyor
 
belt
 
and
 
power moves.
 
The
 
sections
 
are
 
configured as
super sections with two continuous miners available for production.
 
Productivity is planned
at the
 
rate of 272
 
meters of
 
advance per
 
shift of
 
operation.
 
A total of
 
203 employees
 
are
assigned to the mine.
Principal production
 
equipment includes
 
two continuous
 
miners, two
 
roof bolters,
 
four shuttle
cars, and two scoops.
 
Coal is extracted from the production face
 
with the continuous miner
and hauled to
 
the mine
 
conveyor in shuttle
 
cars.
 
At the conveyor
 
belt, the coal
 
is discharged
from the shuttle
 
cars onto a
 
feeder breaker for
 
transfer onto the
 
conveyor.
 
The conveyors
carry the coal to the outside, where it is transported to the Fallowfield preparation plant
 
and
truck load-out via overland conveyor.
 
 
 
ex964p2i0.jpg
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
40
The Fallowfield property boundary is traversed
 
by the four-lane limited-access Mon-Fayette
Expressway in addition
 
to numerous improved
 
roads.
 
Previous mining and
 
coal preparation
facilities have existed in the immediate vicinity of the proposed
 
Fallowfield surface facilities.
 
No extraordinary
 
measures or
 
expenses will
 
be required
 
to establish
 
infrastructure or
 
utilities
at the
 
Fallowfield site.
 
Due to
 
the projected
 
starting date
 
for the
 
Fallowfield mine,
 
no detailed
design
 
of
 
infrastructure
 
or
 
surface
 
facilities
 
has
 
been
 
completed
 
to
 
date.
 
The
 
proposed
mines are
 
located in
 
the Appalachian
 
Basin, which
 
has an
 
extensive history
 
(greater than
100 years) of coal mining.
 
There is a sufficient population base within commuting distance
of the proposed operations; no
 
Camp or Town
 
construction will be required.
 
Mine opening
capital expenditures are included in the MM&A financial model.
Due
 
to
 
the
 
projected
 
start-up
 
date
 
of
 
the
 
Fallowfield
 
mine,
 
no
 
permit
 
work
 
has
 
been
completed
 
to
 
date.
 
The
 
proposed
 
mine
 
is
 
located
 
in
 
an
 
area
 
with
 
a
 
long
 
history
 
of
 
coal
mining,
 
with
 
numerous
 
permitted
 
operations
 
in
 
close
 
proximity.
 
Coal
 
mining
 
permits
 
are
routinely obtained; a two-
 
to three-year lead time
 
is recommended.
 
Estimated expenditures
for mine
 
closure and
 
site reclamation
 
are included
 
in the
 
financial model
 
for each
 
mine or
plant site.
Infrastructure for Fallowfield will resemble that shown in
Figure 13-1
 
for Pangburn.
14
Processing and Recovery Methods
14.1
 
Description or Flowsheet
Due to
 
the projected
 
starting date
 
for the
 
Mon Valley
 
Complex, only
 
preliminary design
 
of
preparation plant or associated
 
material handling facilities has
 
been initiated to date.
 
Coal
processing is
 
a well
 
understood science—it
 
is anticipated
 
that typical
 
coal sizing,
 
cleaning
and dewatering
 
equipment will
 
be utilized
 
for processing
 
of run-of-mine
 
coal at
 
Pangburn,
including combinations
 
of vibratory
 
screens, classifying
 
cyclones, heavy
 
media baths,
 
heavy
media
 
cyclones,
 
spirals,
 
froth
 
flotation,
 
and
 
drain-and-rinse
 
screens,
 
screen-bowl
centrifuges, among
 
others.
 
No novel
 
technologies will
 
be required
 
to process
 
run-of-mine
material.
 
14.2
 
Requirements for Energy, Water,
 
Material and Personnel
The
 
Mon
 
Valley
 
property
 
has
 
sources
 
of
 
water,
 
power,
 
personnel,
 
and
 
supplies
 
readily
available
 
for
 
use.
 
Personnel
 
have
 
historically
 
been
 
sourced
 
from
 
the
 
surrounding
communities in
 
Allegheny,
 
Washington,
 
and Westmoreland
 
Counties, and
 
have proven
 
to
be
 
adequate
 
in
 
numbers to
 
operate
 
the mines.
 
As
 
mining
 
is common
 
in
 
the
 
surrounding
areas, the workforce is
 
generally familiar with mining
 
practices, and many are
 
experienced
miners.
 
Water is expected to be sourced locally
 
from nearby public water sources
 
or rivers.
 
Electricity
 
is
 
anticipated
 
to
 
be
 
sourced
 
from
 
West
 
Penn
or
 
Duquesne
 
Light.
 
The
 
service
industry
 
in
 
the
 
areas
 
surrounding
 
the
 
proposed
 
mine
 
complex
 
has
 
historically
 
provided
supplies,
 
equipment
 
repairs
 
and
 
fabrication,
 
etc.
 
Barge
 
transport
 
on
 
the
 
Monongahela
River/Ohio River
 
system will serve
 
as the
 
main means
 
of product
 
transport from
 
the mine,
 
 
ex964p2i0.jpg
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
41
and
 
currently
 
serve
 
as
 
a
 
means
 
of
 
coal
 
transportation
 
for
 
neighboring
 
Pittsburgh
 
seam
operations.
15
Infrastructure
Due
 
to
 
the
 
projected
 
starting
 
date
 
for
 
the
 
Mon
 
Valley
 
mines,
 
only
 
conceptual
 
design
 
of
infrastructure and surface facilities has been completed to date.
 
The
 
proposed
 
Pangburn
 
mine
 
will
 
be
 
located
 
approximately
 
1.6
 
kilometers
 
south
 
of
 
the
community of
 
Elizabeth, PA.
 
Main paved
 
roads exist
 
both east
 
and west
 
of the
 
site.
 
The
proposed dock, located on the western boundary of the proposed Pangburn permit area, is
currently
 
used
 
for
 
bulk
 
material
 
transhipment.
 
The
 
area
 
has
 
hosted
 
both
 
industrial
 
and
residential
 
development
 
for
 
an
 
extensive
 
time
 
period.
 
No
 
extraordinary
 
measures
 
or
expenses will be required to establish infrastructure or utilities at the Pangburn site.
 
The
 
Shaner
 
mine
 
will
 
be
 
located
 
approximately
 
1.6
 
kilometers
 
north
 
of
 
the
 
community
 
of
Sutersville, PA, between the Youghiogheny and Monongahela Rivers.
 
Numerous improved
roads traverse the Property.
 
An additional shaft and slope will be required
 
to access Upper
Freeport
 
seam
 
reserves
 
west
 
of
 
the
 
Monongahela
 
River,
 
accessed
 
across
 
the
 
1
st
 
Street
bridge
 
and
 
Douglass Run
 
Road.
 
The
 
immediate
 
vicinity of
 
the
 
proposed
 
Shaner
 
surface
facilities
 
is
 
well
 
developed;
 
no
 
extraordinary
 
measures
 
or
 
expenses
 
will
 
be
 
required
 
to
establish infrastructure or utilities at the Shaner site.
The
 
Fallowfield
 
property
 
boundary
 
is
 
traversed
 
by
 
the
 
4-lane
 
limited-access
 
Mon-Fayette
Expressway in addition
 
to numerous improved
 
roads.
 
Previous mining and
 
coal preparation
facilities have existed in the immediate vicinity of the proposed
 
Fallowfield surface facilities.
 
No extraordinary
 
measures or
 
expenses will
 
be required
 
to establish
 
infrastructure or
 
utilities
at the
 
Fallowfield site.
 
Due to
 
the projected
 
starting date
 
for the
 
Fallowfield mine,
 
no detailed
design of infrastructure or surface facilities has been completed to date.
 
A CSX
 
rail line
 
and loadout
 
on the
 
Monongahela River
 
as well
 
as barge
 
transportation on
the river are expected to serve as the primary means of transport for produced coal.
 
16
Market Studies
16.1
 
Market Description
The
 
quality
 
characteristics
 
for
 
the
 
subject
 
coal
 
resources
 
and
 
coal
 
reserves
 
have
 
been
reviewed in
 
detail by
 
MM&A.
 
The drill
 
hole data
 
were utilized
 
to develop
 
average coal
 
quality
characteristics
 
for
 
the
 
mining
 
site.
 
These
 
average
 
coal
 
quality
 
characteristics
 
were
 
then
utilized
 
as
 
the
 
basis
 
for determining
 
the
 
various markets
 
into
 
which
 
the
 
saleable
 
coal
 
will
likely be placed.
 
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
42
The projected quality specifications
 
for the Mon Valley
 
products are as shown
 
in
Table
 
16-
1
.
Table 16-1:
 
Quality Specifications by Product
 
HVB
Moisture (%)
7.50
Ash (%)
7.50
Sulfur (%)
1.2
Volatile Matter (%)
35
Btu/lb.
N/A
Fluidity (ddpm)
26,000
MMR (%)
0.98
CSR
55
FSI
7.50
Note:
 
All Specs are dry basis except Moisture.
 
Life-
of-mine sulfur for Pangburn is an estimated 1.21%;
however, overall Mon Valley Complex reserve
average is 1.36% sulfur.
All of the mine production is
 
projected to serve the metallurgical markets.
 
The metallurgical
coal is marketed as a high-volatile (typically greater
 
than 31 percent volatile matter content)
product on both the domestic and export markets.
16.2
 
Price Forecasts
Coronado
 
provided
 
MM&A
 
with
 
price
 
forecasts
 
for
 
its
 
active
 
operations.
 
Customer
 
coal
pricing is
 
derived from
 
market observed
 
forward estimates
 
based on
 
global economic
 
supply
and demand
 
analysis which
 
is applied
 
to mine plan
 
sales volumes
 
and product
 
mix and
 
is
supplemented
 
with
 
Coronado’s
 
in-house
 
knowledge
 
of
 
applicable
 
rail
 
transportation
charges, ocean freight
 
charges and port
 
charges.
 
MM&A extrapolated the
 
provided data for
the greenfield Mon
 
Valley
 
operations.
 
Concurrent with aforementioned
 
quality parameters
in the preceding section, production from the proposed operations is assumed to be sold in
high volatile
 
domestic and
 
export coal
 
markets with
 
respective percentages
 
of 66
 
percent
and 34
 
percent.
 
The pricing
 
data assumes
 
HVB domestic
 
and export
 
FOB-mine prices of
approximately $137 and $120 per metric tonne for calendar year 2027.
 
HVB domestic and
export
 
prices
 
respectively
 
increase
 
to
 
approximately
 
$221
 
and
 
$193
 
per
 
metric
 
tonne
through year 2050, and then increased by 1% annual inflation thereafter.
Coal
 
price
 
forecasts
 
for
 
the
 
Mon
 
Valley
 
products
 
were
 
provided
 
by
 
Coronado
 
for
 
various
coal markets in terms of US nominal dollars per metric tonne.
16.3
 
Contract Requirements
Some contracts are necessary for
 
successful marketing of the coal.
 
For Mon Valley,
 
since
all
 
mining,
 
preparation
 
and
 
marketing
 
is
 
done
 
in-house,
 
the
 
remaining
 
contracts
 
required
are:
>
Transportation
 
– The Mine contracts with barge transportation companies or with CSX
Railroad to transport the coal to either of the domestic customers ports for overseas
shipments.
 
 
ex964p2i0.jpg
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
43
>
Handling
 
– Contracts for loading vessels for export sales are necessary.
 
These are
typically handled by annual negotiations based on projected shipments.
>
Sales
– Sales contracts are a mix of spot and contract sales.
 
With the volatility of the
market, long-term contracts are not typically written.
17
Environmental Studies, Permitting and Plans,
Negotiations or
 
Agreements with Local
Individuals
 
17.1
 
Results of Studies
MM&A is not
 
aware of any
 
Phase I Environmental
 
Site Assessment (
ESA
) completed on
 
the
Mon Valley
 
property on behalf of
 
Coronado.
 
Coronado reports not having
 
conducted such
a study.
 
Based on our experience with Coronado, it is the QPs’ opinion that Coronado has
a generally typical coal industry record
 
of compliance with applicable mining, water quality,
and
 
environmental
 
laws.
 
Estimated
 
costs
 
for
 
mine
 
closure,
 
including
 
water
 
quality
monitoring during site reclamation, are included in the financial models.
17.2
 
Requirements and Plans for Waste Disposal
A study completed on behalf of Coronado
 
has identified a Preferred Site for refuse
 
disposal
at
 
Pangburn
 
with
 
capacity
 
of
 
22.6
 
million
 
cubic
 
meters.
 
Estimated
 
requirements
 
for
Pangburn and
 
Shaner combined
 
is 29.7 million
 
tonnes or approximately
 
13.2 million
 
cubic
meters.
 
Permitting for such a facility is anticipated to be achievable.
17.3
 
Permit Requirements and Status
All
 
mining
 
operations
 
are
 
subject
 
to
 
federal
 
and
 
state
 
laws
 
and
 
must
 
obtain
 
permits
 
to
operate
 
mines,
 
coal
 
preparation
 
and
 
related
 
facilities,
 
haul
 
roads,
 
and
 
other
 
incidental
surface
 
disturbances
 
necessary
 
for
 
mining
 
to
 
occur.
 
Permits
 
generally
 
require
 
that
 
the
permittee post a performance
 
bond in an amount
 
established by the regulatory
 
program to
provide
 
assurance
 
that
 
any
 
disturbance
 
or
 
liability
 
created
 
during
 
mining
 
operations
 
is
properly
 
restored
 
to
 
an
 
approved
 
post-mining
 
land
 
use
 
and
 
that
 
all
 
regulations
 
and
requirements of the
 
permits are fully
 
satisfied before the
 
bond is returned
 
to the permittee.
 
Significant penalties exist for
 
any permittee who fails
 
to meet the obligations of
 
the permits
including cessation of mining
 
operations, which can lead to
 
potential forfeiture of
 
the bond.
 
Any company,
 
and its
 
directors, owners,
 
and officers,
 
which are
 
subject to
 
bond forfeiture
can be denied future permits under the program.
1
The refuse
 
disposal area
 
will receive
 
combined coarse
 
refuse from
 
the proposed
 
preparation
plant by conveyor
 
belts.
 
The fine
 
material will
 
be processed by
 
filter press
 
technology where
1
 
Monitored under the Applicant Violator System (AVS) by the Federal Office of Surface Mining.
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
44
the majority
 
of the
 
water is
 
removed.
 
The filter
 
cake material
 
will be
 
placed on
 
the refuse
conveyor for disposal with the coarse portion of the refuse material.
New permits or permit revisions will
 
occasionally be necessary to facilitate the
 
expansion or
addition
 
of
 
new
 
mining
 
areas
 
on
 
the
 
properties,
 
such
 
as
 
amendments
 
to
 
existing
 
permits
and
 
new
 
permits
 
for
 
mining
 
of
 
reserve
 
areas.
 
Exploration
 
permits
 
also
 
are
 
required.
 
Property under lease
 
includes provisions for
 
exploration among the
 
terms of the
 
lease.
 
New
or
 
modified
 
mining
 
permits
 
are
 
subject
 
to
 
a
 
public
 
advertisement
 
process
 
and
 
comment
period, and the public is provided an
 
opportunity to raise objections to any proposed
 
mining
operation.
 
MM&A is not aware of any specific prohibition of mining
 
on the subject property
and given sufficient
 
time and planning,
 
Coronado should be
 
able to secure
 
new permits to
maintain its planned mining operations within
 
the context of current regulations.
 
Portions of
the
 
properties
 
are
 
located
 
near
 
local
 
communities.
 
Regulations
 
prohibit
 
mining
 
activities
within 91 meters of a residential dwelling, school, church, or similar structure unless written
consent
 
is first
 
obtained
 
from the
 
owner of
 
the structure.
 
Where required,
 
such consents
have been obtained where mining is proposed beyond the regulatory limits.
MM&A is unaware of
 
any obvious or current Coronado
 
permitting issues that are
 
expected
to prevent
 
the issuance
 
of future
 
permits.
 
Coronado, along
 
with all
 
coal producers,
 
is subject
to
 
a
 
level
 
of
 
uncertainty
 
regarding
 
future
 
clean
 
water
 
permits
 
due
 
to
United
 
States
Environmental Protection Agency
(
EPA
)
 
involvement with state programs.
 
17.4
 
Local Plans, Negotiations or Agreements
MM&A found no indication of requirements for agreements beyond the
 
scope of Federal or
State Regulations.
17.5
 
Mine Closure Plans
Applicable regulations require that
 
mines be properly closed,
 
and reclamation commenced
immediately
 
upon
 
abandonment.
 
In
 
general,
 
site
 
reclamation
 
includes
 
removal
 
of
structures, backfilling, regrading,
 
and revegetation of
 
disturbed areas.
 
Sediment control is
required
 
during
 
the
 
establishment
 
of
 
vegetation,
 
and
 
bond
 
release
 
generally
 
requires
 
a
minimum
 
five-year
 
period
 
of
 
site
 
maintenance,
 
water
 
sampling,
 
and
 
sediment
 
control
following mine completion.
 
This requirement is reduced to two years for certain operations
involving
 
re-mining.
 
Reclamation
 
of
 
underground
 
mines
 
includes
 
closure
 
and
 
sealing
 
of
mine openings such as portals and shafts in addition to the items listed above.
 
Estimated costs for mine
 
closure, including water quality
 
monitoring during site reclamation,
are included in the
 
financial model.
 
As with all mining
 
companies, an accretion calculation
is performed annually so the necessary Asset Retirement Obligations (
ARO
) can be shown
as a Liability on the Balance Sheet.
17.6
 
Qualified Person’s Opinion
The QPs know
 
of no reason that any permits that may be required cannot be obtained.
 
 
 
ex964p2i0.jpg
 
ex964p14i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
45
Estimated expenditures for site closure and reclamation are included
 
in the financial model
for these sites.
18
Capital and Operating Costs
18.1
 
Capital Cost Estimate
The
 
production
 
sequence
 
selected
 
for
 
a
 
property
 
must
 
consider
 
the
 
proximity
 
of
 
each
reserve area
 
to coal
 
preparation plants,
 
river docks and
 
railroad loading
 
points, along
 
with
suitability of production equipment to
 
coal seam conditions.
 
The in-place infrastructure was
evaluated, and
 
any future
 
needs were
 
planned to
 
a level
 
suitable for
 
a Preliminary
 
Feasibility
Study and included in the Capital Forecast.
MM&A
developed capital spending estimates for the proposed operations in the Mon Valley
Complex.
 
MM&A’s capital schedules assume that major equipment rebuilds occur over the
course of each machine’s remaining assumed operating life.
 
Replacement equipment was
scheduled based on MM&A’s
 
experience and knowledge of mining equipment and industry
standards with respect to the useful life of such equipment.
 
A summary of the estimated capital for the Property is provided in
Figure 18-1
 
below.
 
Figure 18-1:
 
CAPEX
18.2
 
Operating Cost Estimate
Coronado
 
provided
 
a
 
historical
 
summary
 
of
 
operating
 
costs
 
for
 
similar
 
operations
 
for
MM&A’s
 
review.
 
MM&A used
 
the historical
 
and/or budget
 
cost information
 
as a
 
reference
and
 
developed
 
a
 
personnel
 
schedule
 
for
 
the
 
mine.
 
Hourly
 
labor
 
rates
 
and
 
salaries
 
were
based upon information contained in Coronado’s financial summaries.
 
Fringe benefit costs
were
 
developed
 
for
 
vacation
 
and
 
holidays,
 
federal
 
and
 
state
 
unemployment
 
insurance,
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
46
retirement,
 
workers’
 
compensation
 
and
 
pneumoconiosis,
 
casualty
 
and
 
life
 
insurance,
healthcare,
 
and
 
bonuses.
 
A
 
cost
 
factor
 
for
 
mine
 
supplies
 
was
 
developed
 
that
 
relates
expenditures
 
to
 
mine
 
advance
 
rates
 
for
 
roof
 
control
 
costs
 
and
 
other
 
mine
 
supply
 
costs
experienced
 
at
 
underground
 
mines.
 
Other
 
factors
 
were
 
developed
 
for
 
maintenance
 
and
repair costs, rentals, mine power, outside services and other direct mining costs.
 
Other cost
 
factors were
 
developed for
 
coal preparation
 
plant processing,
 
refuse handling,
coal
 
loading,
 
property
 
taxes,
 
and
 
insurance and
 
bonding.
 
Appropriate
 
royalty
 
rates
 
were
assigned for production from leased
 
coal lands and sales taxes were
 
calculated for federal
black
 
lung
 
excise
 
tax,
 
and
 
federal
 
reclamation
 
fees.
 
There
 
are
 
currently
 
no
 
state
 
coal
severance or reclamation taxes required in Pennsylvania.
Mandated Sales Related Costs such as Black Lung Excise are summarized in
 
Table
 
18-1.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
47
Table 18-1:
 
Estimated Coal Production Taxes and Sales Costs
Description of Tax or Sales Cost
Basis of Assessment
Cost
Federal Black Lung Excise Tax -
Underground
Per Tonne
$1.21
 
Federal Reclamation Fees – Underground
Per Tonne
$0.13
 
Royalties – Underground
Percentage of Revenue
7%
Note:
 
1.
 
Federal black lung excise tax is paid only on
 
coal sold domestically.
 
MM&A assumed 45% of total coal
sales to be domestic in the economic analysis discussed
 
below.
A summary of the projected Operating Costs is in
Table
 
18-2
.
Table 18-2:
 
Mon Valley Operating Costs
 
 
YE
12/31
2022
YE
12/31
2023
YE
12/31
2024
YE
12/31
2025
YE
12/31
2026
YE
12/31
2027
YE
12/31
2028
YE
12/31
2029
Remaining
 
Total
LOM
Average
ROM Production Tonnes
198.4
-
-
-
-
-
-
-
-
2.8
Yield
68.19%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
68.19%
Saleable Production
Tonnes
*
135.3
-
-
-
-
-
-
-
-
2.0
 
Thermal Tonnes
-
-
-
-
-
-
-
-
-
-
Domestic Met Tonnes
89.3
-
-
-
-
-
-
-
-
1.3
Export Met Tonnes
46.0
-
-
-
-
-
-
-
-
0.7
 
Total Saleable Tonnes
135.3
-
-
-
-
-
-
-
-
2.0
 
Cash Costs per Tonne:
Mining Costs
$98.16
$-
$-
$-
$-
$-
$-
$-
$-
 
$98.16
 
Processing and
Transport
 
$36.04
 
$-
$-
$-
$-
$-
$-
$-
$-
 
$36.04
 
Sales Related Costs
 
$1.73
 
$-
$-
$-
$-
$-
$-
$-
$-
 
$1.73
 
G&A
 
$5.42
 
$-
$-
$-
$-
$-
$-
$-
$-
 
$5.42
 
 
Total Cash Costs
 
$141.35
 
$-
$-
$-
$-
$-
$-
$-
$-
 
$141.33
 
Financial model includes 0.9 million tonnes of inferred coal
 
production.
 
Inferred coal represents 0.6% of the total production,
 
and none of this coal was
included in the estimate of reserves.
19
Economic
 
Analysis
19.1
 
Assumptions, Parameters and Methods
A pre-feasibility LOM plan was
 
prepared by MM&A for
 
the proposed Mon Valley operations.
 
MM&A
 
prepared
 
mine
 
projections
 
and
 
production
 
timing
 
forecasts
 
based
 
on
 
coal
 
seam
characteristics.
 
Production timing
 
was
 
carried out
 
from 2031
 
to
 
depletion (exhaustion)
 
of
the coal reserve areas, which
 
is projected for the year 2099.
 
All costs and prices are based
on 2021 nominal United States dollars.
The
 
Mine
 
plan,
 
productivity
 
expectations
 
and
 
cost
 
estimates
 
generally
 
reflect
 
historical
performance by Coronado
 
and efforts have
 
been made to
 
adjust plans and costs
 
to reflect
future conditions.
 
MM&A is confident
 
that the mine
 
plan and financial
 
model are reasonably
representative to provide an accurate estimation of coal reserves.
Capital schedules were developed by MM&A for mine development, infrastructure, and on-
going
 
capital
 
requirements
 
for
 
the
 
life
 
of
 
the
 
mine.
 
Staffing
 
levels
 
were
 
prepared,
 
and
operating
 
costs
 
estimated
 
by
 
MM&A.
 
MM&A
 
utilized
 
historical
 
cost
 
data
 
provided
 
by
 
 
ex964p2i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
48
Coronado and
 
its own knowledge
 
and experience to
 
estimate direct and
 
indirect operating
costs.
 
The preliminary feasibility financial model, prepared for this TRS, was developed to
 
test the
economic
 
viability
 
of
 
the
 
coal
 
reserve
 
area.
 
The
 
results
 
of
 
this
 
financial
 
model
 
are
 
not
intended to
 
represent a
 
bankable feasibility
 
study,
 
required for
 
financing of
 
any current
 
or
future mining
 
operations, but
 
are intended to
 
prove the
 
economic viability of
 
the estimated
coal
 
reserves.
 
All
 
costs
 
and
 
prices
 
are
 
based
 
on
 
2021
 
nominal
 
United
 
States
 
dollars
assuming a 2% inflation rate with one noted exception.
 
An inflation rate of 1% was applied
to the sales price after year 2050.
On an unlevered basis, the NPV of the project cash flows after taxes
 
was estimated for the
purpose
 
of
 
classifying coal
 
reserves.
 
The project
 
cash flows,
 
excluding
 
debt service,
 
are
calculated
 
by
 
subtracting direct
 
and
 
indirect operating
 
expenses and
 
capital expenditures
from
 
revenue.
 
Direct
 
costs
 
include
 
labor,
 
drilling
 
and
 
blasting,
 
operating
 
supplies,
maintenance
 
and
 
repairs,
 
facilities
 
costs
 
for
 
materials
 
handling,
 
coal
 
preparation,
 
refuse
disposal,
 
coal
 
loading,
 
sampling
 
and
 
analysis
 
services,
 
reclamation
 
and
 
general
 
and
administrative costs.
 
Indirect costs
 
include statutory
 
and legally
 
agreed upon
 
fees related
to direct extraction of
 
the mineral.
 
The indirect costs
 
are the Federal
 
black lung tax, Federal
reclamation
 
taxes,
 
property
 
taxes,
 
local
 
transportation
 
prior
 
to
 
delivery
 
at
 
rail
 
or
 
barge
loading sites, coal
 
production royalties, sales
 
and use taxes,
 
and income taxes.
 
Coronado’s
historical costs provided a useful reference for MM&A’s cost
 
estimates.
Sales
 
revenue
 
is
 
based
 
on
 
the metallurgical
 
coal
 
price
 
information provided
 
to
 
MM&A
 
by
Coronado.
Projected debt service is excluded from the P&L and cash flow model in order to determine
Enterprise Value.
The financial model expresses
 
coal sales prices, operating costs,
 
and capital expenditures
in current day dollars without
 
adjustment for inflation.
 
Capital expenditures and reclamation
costs are
 
included based on
 
engineering estimates for
 
each mine by
 
year.
 
The Coronado
division’s existing allocations of administrative costs are continued in the future projections.
Coronado
 
will
 
pay
 
royalties
 
for
 
the various
 
current
 
and
 
projected
 
operations.
 
The royalty
rates vary
 
by mining method
 
and location.
 
The royalty rates
 
for Mon
 
Valley
 
are estimated
to be 7% of the sales revenue.
The projection
 
model also
 
includes consolidated
 
income tax
 
calculations at
 
the Coronado
level,
 
incorporating
 
statutory
 
depletion
 
calculations,
 
as
 
well
 
as
 
state
 
income
 
taxes,
 
and
 
a
federal
 
tax
 
rate
 
of
 
21%.
 
To
 
the
 
extent
 
the
 
mine
 
generates
 
net
 
operating
 
losses
 
for
 
tax
purposes, the
 
losses are
 
carried over
 
to offset
 
future taxable
 
income.
 
The terms
 
“cash flows”
and “project cash flows” used in this report refer to after tax cash flows.
Consolidated cash flows
 
are driven by
 
annual sales tonnage,
 
which grows from 0.4
 
million
tonnes in
 
2031 to
 
a peak
 
of 3.8
 
million tonnes
 
in 2059.
 
Between years
 
2060 and
 
2089, sales
 
 
ex964p2i0.jpg ex964p58i1.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
49
ranges
 
from
 
1.5
 
million
 
to
 
2.7
 
million
 
tonnes
 
and
 
between
 
years
 
2090-2099,
 
sales
 
range
from 0.4
 
million tonnes
 
to 1.3
 
million tonnes.
 
Projected consolidated
 
revenue grows
 
from
$57.4 million in
 
2031 to
 
a peak
 
of $891.5
 
million in
 
2059.
 
Revenue totals
 
$32.7 billion
 
for
the project’s life.
Consolidated
 
cash
 
flow
 
from
 
operations
 
is
 
positive
 
throughout
 
the
 
projected
 
operating
period,
 
with
 
the
 
exception
 
of
 
post-production
 
years,
 
due
 
to
 
end-of-mine
 
reclamation
spending.
 
Consolidated
 
cash
 
flow
 
from
 
operations
 
peaks
 
at
 
$359.2
 
million
 
in
 
2059
 
and
totals $9.0 billion over the project’s life.
 
Capital expenditures total $485.8 million during the
first five years and $3.3 billion over the project’s life.
 
Coal price forecasts
 
for coal products were
 
prepared by Coronado for
 
its active operations
and modified appropriately
 
by MM&A for
 
its greenfield operations.
 
Such prices were
 
used
for
 
the
 
revenue
 
input
 
into
 
the
 
financial
 
model.
 
Sales
 
variable
 
costs
 
such
 
as
 
production
royalties were based upon the revenue input.
19.2
 
Results
The pre-feasibility financial model,
 
prepared by MM&A for
 
this TRS, was developed
 
to test
the economic viability
 
of each coal
 
resource area.
 
The results of
 
this financial model
 
are not
intended to
 
represent a
 
bankable feasibility
 
study,
 
as may be
 
required for
 
financing of
 
any
current or
 
future mining
 
operations contemplated
 
but are
 
intended to
 
prove the
 
economic
viability of
 
the estimated
 
coal reserves.
 
Optimization of
 
the LOM
 
plan was
 
outside the
 
scope
of the engagement.
Figure
 
19-1
 
shows
 
the
 
annual
 
variance
 
of
 
cash
 
costs
 
per
 
ton.
 
Table
 
19-1
 
shows
 
LOM
tonnage, P&L, and EBITDA for each proposed Coronado mines in Mon Valley
 
.
Figure 19-1:
 
Cash Costs per Tonne
As
 
shown
 
above,
 
the
 
mines’
 
average
 
cash
 
cost
 
ranges
 
between
 
approximately
 
$56
 
and
$311 per tonne for most of the operating period.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
50
Table 19-1:
 
Life-of-Mine Tonnage, P&L before Tax, and EBITDA ($000)
 
LOM
LOM
P&L
LOM
EBITDA
 
Tonnes
*
Pre-Tax
 
P&L
Per Tonne
EBITDA
Per Tonne
Pangburn
14,376
$701,483
$48.80
$1,259,113
$87.59
Fallowfield
72,640
$4,712,144
$64.87
$6,688,054
$92.07
Shaner
48,294
$4,656,184
$96.41
$5,641,238
$116.81
Consolidated PA Deep Mines
135,309
$10,069,811
$74.42
$13,588,405
$100.42
Note:
 
*Financial model includes 0.9
 
million tonnes of inferred
 
coal production.
 
Inferred coal represents
0.6% of the total production, and none of this coal was included in the estimate of reserves.
As
 
shown
 
in
Table
 
19-1,
 
the
 
mines
 
show
 
positive
 
EBITDA
 
over
 
the
 
LOM.
 
Overall,
Coronado’s
 
consolidated
 
operations
 
show
 
positive
 
LOM
 
P&L
 
and
 
LOM
 
EBITDA
 
of
 
$10.0
billion and $13.6 billion,
 
respectively.
 
A summary of the
 
key financial performance metrics
projected for years is provided below in
Table
 
19-2
.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
51
Table 19-2:
 
Summary of Mon Valley Key Financial Performance Metrics (2021-2029)
 
 
YE
12/31
2022
YE
12/31
2023
YE
12/31
2024
YE
12/31
2025
YE
12/31
2026
YE
12/31
2027
YE
12/31
2028
YE
12/31
2029
Remaining
 
Total
LOM
Average
ROM Production Tonnes
198.4
-
-
-
-
-
-
-
-
2.8
Yield
68.19%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
68.19%
Saleable Production
Tonnes
*
135.3
-
-
-
-
-
-
-
-
2.0
 
Thermal Tonnes
-
-
-
-
-
-
-
-
-
-
Domestic Met Tonnes
89.3
-
-
-
-
-
-
-
-
1.3
Export Met Tonnes
46.0
-
-
-
-
-
-
-
-
0.7
 
Total Saleable Tonnes
135.3
-
-
-
-
-
-
-
-
2.0
 
Cash Costs per Tonne:
Mining Costs
$98.16
$-
$-
$-
$-
$-
$-
$-
$-
$98.13
Processing and
Transport
$36.04
$-
$-
$-
$-
$-
$-
$-
$-
$36.04
Sales Related Costs
$1.73
$-
$-
$-
$-
$-
$-
$-
$-
$1.73
G&A
$5.42
$-
$-
$-
$-
$-
$-
$-
$-
$5.42
 
Total Cash Costs
$141.35
$-
$-
$-
$-
$-
$-
$-
$-
$141.33
 
EBITDA per Tonne
$100.15
$-
$-
$-
$-
$-
$-
$-
$-
$100.18
 
Expansion CapEx ($M)
$35.82
$1.02
$-
$-
$-
$-
$5.09
$29.72
$-
$-
Maintenance CapEx ($M)
$3,258.12
$-
$-
$-
$-
$-
$-
$-
$35.26
$43.58
 
Total CapEx
$3,293.95
$1.02
$-
$-
$-
$-
$5.09
$29.72
$35.26
$43.58
●
 
Financial model includes 0.9 million tonnes of inferred coal production.
 
Inferred coal represents 0.6% of the
total production, and none of this coal was included in the estimate of reserves.
After-Tax
 
Cash Flows were developed in
 
order to calculate the NPV
 
for this Property.
 
The
NPV is estimated to
 
be $287.3 million at
 
a discount rate of
 
10.0%.
 
A summary of
 
the Mon
Valley after-tax
 
cash flow is shown in
Table
 
19-3
.
Table 19-3:
 
Project Cash Flow Summary (000)
*
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
Total
2026
2027
2028
2029
2030
Production & Sales tonnes
135,311
-
-
-
-
-
Total Revenue
$32,678,158
$-
$-
$-
$-
$-
EBITDA
$11,822,150
$(369)
$(369)
$(369)
$(369)
$(369)
Net Income
$5,925,986
$(369)
$(369)
$(369)
$(369)
$(369)
Net Cash Provided by Operating Activities
$9,042,337
$(369)
$(369)
$(369)
$(369)
$(312)
Purchases of Property, Plant, and Equipment
$(3,293,945)
$-
$(5,087)
$(29,721)
$(35,261)
$(215,753)
Net Cash Flow
$5,748,391
$(369)
$(5,456)
$(30,090)
$(35,629)
$(216,065)
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2031
2032
2033
2034
2035
2036
Production & Sales tonnes
399
1,810
1,875
1,958
2,029
2,030
Total Revenue
$57,415
$266,199
$281,967
$301,091
$319,037
$326,330
EBITDA
$31,974
$163,768
$175,562
$191,169
$204,833
$209,981
Net Income
$(43,182)
$84,520
$86,628
$82,382
$94,260
$106,329
Net Cash Provided by Operating Activities
$25,910
$135,802
$160,145
$157,652
$168,511
$179,238
Purchases of Property, Plant, and Equipment
$(199,931)
$(1,928)
$-
$(21,158)
$(19,527)
$(204,537)
Net Cash Flow
$(174,021)
$133,874
$160,145
$136,494
$148,984
$(25,299)
 
 
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
52
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2037
2038
2039
2040
2041
2042
Production & Sales tonnes
2,062
1,960
1,762
2,366
1,804
1,724
Total Revenue
$338,825
$329,205
$302,680
$415,404
$307,404
$305,722
EBITDA
$217,762
$206,113
$179,715
$261,905
$167,920
$166,433
Net Income
$94,184
$107,142
$79,588
$136,843
$92,275
$83,239
Net Cash Provided by Operating Activities
$190,294
$179,925
$156,327
$197,122
$130,469
$131,680
Purchases of Property, Plant, and Equipment
$(178,362)
$(11,413)
$(10,070)
$(18,939)
$(6,627)
$(11,701)
Net Cash Flow
$11,932
$168,512
$146,257
$178,183
$123,842
$119,979
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2043
2044
2045
2046
2047
2048
Production & Sales tonnes
1,717
1,641
1,719
1,657
1,582
1,704
Total Revenue
$307,825
$296,435
$323,078
$319,329
$311,207
$346,423
EBITDA
$166,345
$155,468
$176,197
$172,276
$164,044
$190,984
Net Income
$97,162
$102,577
$115,995
$111,938
$105,580
$121,920
Net Cash Provided by Operating Activities
$134,459
$126,566
$132,835
$135,759
$130,416
$145,691
Purchases of Property, Plant, and Equipment
$(70,898)
$(32,130)
$(1,608)
$(3,445)
$(20,197)
$(42,226)
Net Cash Flow
$63,561
$94,436
$131,226
$132,313
$110,218
$103,465
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2049
2050
2051
2052
2053
2054
Production & Sales tonnes
1,656
1,732
1,702
1,596
1,642
1,750
Total Revenue
$341,272
$366,419
$363,743
$344,653
$358,264
$385,655
EBITDA
$185,001
$203,854
$199,083
$181,885
$190,949
$208,272
Net Income
$117,207
$139,379
$136,063
$119,219
$124,332
$139,625
Net Cash Provided by Operating Activities
$148,383
$156,450
$155,343
$145,611
$148,945
$159,944
Purchases of Property, Plant, and Equipment
$(21,985)
$(2,264)
$(17,661)
$(35,030)
$(22,841)
$-
Net Cash Flow
$126,398
$154,185
$137,682
$110,580
$126,104
$159,944
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2055
2056
2057
2058
2059
2060
Production & Sales tonnes
1,751
2,609
3,576
3,732
3,846
3,762
Total Revenue
$389,797
$586,754
$812,425
$856,469
$891,518
$881,012
EBITDA
$209,937
$293,768
$402,164
$424,215
$445,248
$430,456
Net Income
$159,520
$155,760
$230,828
$240,983
$258,267
$235,432
Net Cash Provided by Operating Activities
$177,985
$239,301
$313,658
$343,495
$359,216
$357,509
Purchases of Property, Plant, and Equipment
$(503,004)
$(81,075)
$(26,163)
$(36,932)
$(20,244)
$(124,371)
Net Cash Flow
$(325,019)
$158,226
$287,495
$306,563
$338,972
$233,138
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2061
2062
2063
2064
2065
2066
Production & Sales tonnes
3,488
3,390
3,466
3,397
2,961
2,826
Total Revenue
$825,025
$810,082
$836,766
$828,451
$729,294
$703,094
EBITDA
$384,291
$373,425
$383,395
$380,242
$330,841
$317,117
Net Income
$197,731
$249,775
$251,050
$244,672
$199,779
$187,067
Net Cash Provided by Operating Activities
$332,663
$309,606
$303,605
$304,427
$278,545
$263,255
Purchases of Property, Plant, and Equipment
$(48,371)
$(18,997)
$(56,143)
$(55,800)
$(106,035)
$(48,026)
Net Cash Flow
$284,292
$290,609
$247,461
$248,627
$172,510
$215,229
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2067
2068
2069
2070
2071
2072
Production & Sales tonnes
2,479
2,318
2,289
1,438
1,988
1,993
Total Revenue
$623,079
$588,566
$587,014
$372,607
$520,312
$526,958
EBITDA
$274,027
$245,996
$243,975
$120,878
$208,565
$209,313
Net Income
$157,110
$137,332
$132,150
$60,913
$125,427
$130,499
Net Cash Provided by Operating Activities
$236,473
$211,681
$204,662
$72,113
$144,108
$165,794
Purchases of Property, Plant, and Equipment
$(105,470)
$(32,972)
$(35,968)
$(21,665)
$(40,884)
$(29,483)
Net Cash Flow
$131,003
$178,708
$168,694
$50,448
$103,224
$136,311
 
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
53
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2073
2074
2075
2076
2077
2078
Production & Sales tonnes
1,822
2,098
2,055
2,107
1,883
2,129
Total Revenue
$486,489
$513,364
$508,098
$526,120
$474,939
$542,425
EBITDA
$180,965
$192,961
$185,766
$199,986
$169,269
$204,346
Net Income
$110,565
$131,576
$121,087
$124,925
$102,184
$132,803
Net Cash Provided by Operating Activities
$151,740
$149,923
$150,163
$155,728
$139,913
$152,938
Purchases of Property, Plant, and Equipment
$-
$-
$(38,951)
$(73,146)
$(11,367)
$(3,092)
Net Cash Flow
$151,740
$149,923
$111,2
 
12
$82,582
$128,546
$149,846
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2079
2080
2081
2082
2083
2084
Production & Sales tonnes
1,937
1,723
2,242
1,568
2,285
1,637
Total Revenue
$498,511
$448,125
$588,782
$416,070
$612,359
$443,292
EBITDA
$172,232
$139,209
$217,859
$113,527
$222,506
$118,656
Net Income
$108,806
$74,410
$128,734
$54,853
$144,403
$63,019
Net Cash Provided by Operating Activities
$140,295
$115,386
$153,758
$109,676
$151,887
$113,810
Purchases of Property, Plant, and Equipment
$(20,499)
$(63,240)
$(32,548)
$(7,363)
$(18,926)
$(35,128)
Net Cash Flow
$119,796
$52,146
$121,210
$102,313
$132,961
$78,682
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2085
2086
2087
2088
2089
2090
Production & Sales tonnes
1,982
1,477
1,857
1,616
1,993
1,305
Total Revenue
$542,129
$408,032
$518,052
$455,417
$567,535
$375,427
EBITDA
$169,637
$89,713
$145,507
$108,922
$166,892
$55,785
Net Income
$96,625
$31,702
$79,264
$51,566
$96,127
$8,392
Net Cash Provided by Operating Activities
$123,443
$88,067
$104,777
$94,796
$120,752
$66,853
Purchases of Property, Plant, and Equipment
$(35,870)
$(53,613)
$(23,904)
$(32,182)
$-
$(31,114)
Net Cash Flow
$87,573
$34,453
$80,873
$62,614
$120,752
$35,738
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2091
2092
2093
2094
2095
2096
Production & Sales tonnes
1,637
1,612
1,747
1,355
1,731
1,752
Total Revenue
$475,574
$473,016
$517,712
$405,723
$523,488
$535,336
EBITDA
$103,525
$97,847
$113,758
$40,298
$107,715
$110,329
Net Income
$41,301
$32,537
$52,174
$(4,344)
$49,211
$50,915
Net Cash Provided by Operating Activities
$75,371
$81,436
$89,571
$46,746
$76,088
$90,203
Purchases of Property, Plant, and Equipment
$(71,872)
$(66,089)
$-
$-
$(42,121)
$-
Net Cash Flow
$3,499
$15,347
$89,571
$46,746
$33,967
$90,203
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2097
2098
2099
2100
2101
2102
Production & Sales tonnes
1,387
916
393
-
-
-
Total Revenue
$428,077
$285,625
$123,638
$-
$-
$-
EBITDA
$46,344
$27,079
$5,340
$-
$-
$-
Net Income
$2,394
$(3,736)
$(11,836)
$-
$-
$-
Net Cash Provided by Operating Activities
$50,190
$27,994
$(197,622)
$-
$-
$-
Purchases of Property, Plant, and Equipment
$-
$-
$-
$-
$-
$-
Net Cash Flow
$50,190
$27,994
$(197,622)
$-
$-
$-
●
 
Financial model includes 0.9 million tonnes of inferred coal production.
 
Inferred coal represents 0.6% of the
total production, and none of this coal was included in the estimate of reserves.
19.3
 
Sensitivity
Sensitivity of the NPV results to changes in
 
the key drivers is presented in the chart below.
 
The
 
sensitivity
 
study
 
shows
 
the
 
NPV
 
at
 
the
 
10.0%
 
discount
 
rate
 
when
 
Base
 
Case
 
sales
prices, operating costs, and capital costs are increased
 
and decreased in increments of 5%
within a +/- 15% range.
 
 
ex964p2i0.jpg
 
 
ex964p63i0.jpg
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
54
Figure 19-2:
 
Sensitivity of NPV
As shown, NPV
 
is quite sensitive
 
to change in
 
sales price and
 
operating cost estimates,
 
and
slightly sensitive to changes in capital cost estimates.
20
Adjacent Properties
20.1
 
Information Used
No Proprietary information associated
 
with neighboring properties
 
was used as part
 
of this
study.
21
Other Relevant Data and Information
MM&A
 
performed
 
a
 
previous
 
audit
 
of
 
the
 
Property
 
in
 
2017
 
for
 
Coronado
 
based
 
on
 
SEC
Industry
 
Guide
 
7
 
standards.
 
MM&A
 
conducted
 
a
 
Joint
 
Ore
 
Reserve
 
Committee
 
(
JORC
)
compliant resource and
 
reserve assessment of
 
the Mon Valley
 
assets effective
 
January 1,
2018.
 
By assignment,
 
the JORC
 
assessment included
 
a preliminary
 
feasibility level
 
study
of
 
the
 
subject
 
coal
 
reserves,
 
encompassing
 
detailed
 
mine
 
planning
 
and
 
cost
 
analysis
through depletion
 
of Mon
 
Valley’s JORC-compliant coal
 
reserves.
 
MM&A utilized
 
this former
preliminary feasibility study as
 
the basis of an updated
 
study which meets those
 
standards
set forth by the JORC Code and SEC.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
55
22
Interpretation and Conclusions
22.1
 
Conclusion
Sufficient data has
 
been obtained through
 
various exploration and sampling
 
programs and
mining operations to support the geological interpretations of seam structure and thickness
for coal horizons situated on the Property.
 
The data is of sufficient quantity and reliability
 
to
reasonably support the coal resource and coal reserve estimates in this TRS.
The geological data and
 
preliminary feasibility study, which consider mining
 
plans, revenue,
and operating
 
and capital
 
cost estimates
 
are sufficient
 
to support
 
the classification
 
of coal
reserves provided herein.
This
 
geologic
 
evaluation
 
conducted
 
in
 
conjunction
 
with
 
the
 
preliminary
 
feasibility
 
study
 
is
sufficient to conclude
 
that the 134.4 Mt of
 
marketable underground coal reserves identified
on the Property are economically mineable
 
under reasonable expectations of market prices
for metallurgical coal products, estimated operation costs, and capital expenditures.
22.2
 
Risk Factors
Risks have been identified for operational, technical and administrative subjects addressed
in the Pre-Feasibility Study.
 
A risk matrix
 
has been constructed to
 
present the risk levels
 
for
all the risk factors identified and quantified in the
 
risk assessment process.
 
The risk matrix
and
 
risk
 
assessment
 
process
 
are
 
modeled
 
to
 
that
 
presented
 
in
 
the
 
Australian
 
and
 
New
Zealand Standard on Risk Management (AS/NZS 4360).
 
The purpose
 
of the
 
characterization of
 
the project
 
risk components is
 
to inform
 
the project
stakeholders of
 
key aspects
 
of the
 
Coronado projects
 
that can
 
be impacted
 
by events
 
whose
consequences
 
can
 
affect
 
the
 
success
 
of
 
the
 
venture.
 
The
 
significance
 
of
 
an
 
impacted
aspect
 
of
 
the
 
operation
 
is
 
directly
 
related
 
to
 
both
 
the
 
probability
 
of
 
occurrence
 
and
 
the
severity of
 
the consequences.
 
The initial
 
risk for
 
a risk
 
factor is
 
herein defined
 
as the
 
risk
level
 
after
 
the
 
potential
 
impact
 
of
 
the
 
risk
 
factor
 
is
 
addressed
 
by
 
competent
 
and
 
prudent
management utilizing
 
control measures
 
readily available.
 
Residual risk
 
for a
 
risk factor
 
is
herein
 
defined
 
as
 
the
 
risk
 
level
 
following
 
application
 
of
 
special
 
mitigation
 
measures
 
if
management determines
 
that the
 
initial risk
 
level is
 
unacceptable.
 
Initial risk
 
and residual
risk can be
 
quantified numerically,
 
derived by the
 
product of values
 
assigned to probability
and consequence ranging from very low risk to very high risk.
 
The probability and
 
consequence parameters are
 
subjective numerical estimates
 
made by
practiced mine
 
engineers and
 
managers.
 
Both are
 
assigned values
 
from 1
 
to 5
 
for which
the
 
value
 
1
 
represents
 
the
 
lowest
 
probability
 
and
 
least
 
consequence,
 
and
 
the
 
value
 
5
represents the
 
highest probability
 
and greatest
 
consequence.
 
The products,
 
which define
the Risk Level, are classified from very low to very high.
 
Risk Level Table
 
(R = P x C)
Risk Level (R)
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
56
Very Low (1 to 2)
Low (3 to 5)
Moderate (6 to 11)
High (12 to 19)
Very High (20 to 25)
Risk aspects identified and evaluated during this assignment
 
total 13.
 
No residual risks are
rated Very High.
 
Four (4) residual risks are rated High.
 
Six (6) of the risk aspects could be
associated with Moderate residual risk.
 
Three (3) of the risk
 
aspects were attributed Low or
Very Low residual risks.
 
22.2.1
 
Governing Assumptions
The listing of
 
the aspects is
 
not presumed to
 
be exhaustive.
 
Instead that listing
 
is presented
based on the experiences of the contributors to the TRS.
 
1.
 
The probability and consequence ratings are subjectively assigned, and it is
assumed that this subjectivity reasonably reflects the condition of the active and
projected mine operations.
2.
 
The Control Measures shown in the matrices presented in this chapter are not
exhaustive.
 
They represent a condensed collection of activities that the author of the
risk assessment section has observed to be effective in coal mining scenarios.
 
3.
 
Mitigation Measures listed for each risk factor of the operation are not exhaustive.
 
The measures listed, however, have been observed by the author to be effective.
 
4.
 
The monetary values used in ranking the consequences are generally-accepted
quantities for the coal mining industry.
22.2.2
 
Limitations
The risk
 
assessment proposed
 
in this
 
report is
 
subject to
 
the limitations
 
of the
 
information
currently collected, tested, and interpreted at the time of the writing of the report.
22.2.3
 
Methodology
The numerical quantities (i.e., risk levels) attributable to either “initial” or “residual” risks are
derived by the
 
product of values
 
assigned to probability
 
and consequence ranging
 
from very
low risk to very high risk.
 
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
57
R = P x C
Where:
R = Risk Level
P = Probability of Occurrence
C = Consequence of Occurrence
The Probability (P)
 
and Consequence (C)
 
parameters recited in
 
the formula are
 
subjective
numerical estimates made
 
by practiced mine
 
engineers and managers.
 
Both P and
 
C are
assigned
 
integer
 
values
 
ranging
 
from
 
1
 
to
 
5
 
for
 
which
 
the
 
value
 
1
 
represents
 
the
 
lowest
probability and
 
least consequence,
 
and the
 
value 5
 
represents the
 
highest probability
 
and
greatest consequence.
 
The products (R
 
= P x
 
C) which define
 
the Risk Level,
 
are thereafter
classified from very low to very high.
Risk Level Table
Risk Level (R)
Very Low (1 to 2)
Low (3 to 5)
Moderate (6 to 11)
High (12 to 19)
Very High (20 to 25)
Very
 
high initial risks
 
are considered to
 
be unacceptable and
 
require corrective action
 
well
in advance of project
 
development.
 
In short, measures must
 
be applied to reduce
 
very high
initial risks to a tolerable level.
 
As
 
shown
 
and
 
discussed
 
above,
 
after
 
taking
 
into
 
account
 
the
 
operational,
 
technical,
 
and
administrative actions that have been applied or are available for action when required, the
residual
 
risk
 
can
 
be
 
determined.
 
The
 
residual
 
risk
 
provides
 
a
 
basis
 
for
 
the
 
management
team
 
to
 
determine
 
if
 
the
 
residual
 
risk
 
level
 
is
 
acceptable
 
or
 
tolerable.
 
If
 
the
 
risk
 
level
 
is
determined to be unacceptable, further actions should
 
be considered to reduce the residual
risk to acceptable or tolerable levels to provide justification for continuation of the proposed
operation.
22.2.4
 
Development of the Risk Matrix
Risks
 
have
 
been
 
identified
 
for
 
the
 
technical,
 
operational,
 
and
 
administrative
 
subjects
addressed in
 
the TRS.
 
The risk
 
matrix and
 
risk assessment
 
process are
 
modeled to
 
that
presented
 
in
 
the
 
Australian
 
and
 
New
 
Zealand
 
Standard
 
on
 
Risk
 
Management
 
(AS/NZS
4360).
 
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
58
22.2.4.1
 
Probability Level Table
Table 22-1:
 
Probability Level Table
Category
Probability Level (P)
1
Remote
Not likely to occur except in exceptional circumstances.
<10%
2
Unlikely
Not likely to occur; small in degree.
10 - 30%
3
Possible
Capable of occurring.
30 - 60%
4
Likely
High chance of occurring in most circumstances.
60 - 90%
5
Almost Certain
Event is expected under most circumstances; impossible
 
to
avoid.
>90%
The
 
lowest
 
rated
 
probability
 
of
 
occurrence
 
is
 
assigned
 
the
 
value
 
of
 
1
 
and
 
described
 
as
remote,
 
with
 
a
 
likelihood
 
of
 
occurrence
 
of
 
less
 
than
 
2
 
percent.
 
Increasing
 
values
 
are
assigned to each higher probability of occurrence, culminating with the
 
value of 5 assigned
to incidents considered to be almost certain to occur.
22.2.4.2
 
Consequence Level Table
Table
 
22-2
 
lists the consequence levels.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
59
Table 22-2:
 
Consequence Level Table
Correlation of Events in Key Elements of the
 
Project Program to Event Severity Category
Category
Severity of
the Event
Financial
Impact of the
Event
Unplanned
Loss of
Production
(Impact on
Commercial
Operations)
Events Impacting
on the
Environment
Events Affecting the
Program's Social and
Community Relations
Resultant Regulatory /
Sovereign Risk
Events Affecting Occupational Health &
Safety
1
Insignificant
< USD $0.5
million
≤ 12 hours
Insignificant loss of
habitat; no
irreversible effects
on water, soil and
the environment.
Occasional nuisance impact on
travel.
-
 
Event recurrence avoided by corrective
action through established procedures
(Engineering, guarding, training).
2
Minor
USD $0.5 million
to $2.0 million
≤ 1 day
No significant
change to species
populations; short-
term reversible
perturbation to
ecosystem function.
Persistent nuisance impact on
travel.
 
Transient adverse media
coverage.
-
 
First aid – lost time.
 
Event recurrence
avoided by corrective action through
established procedures.
3
Moderate
USD $2.0 million
to $10.0 million
≤ 1 week
Appreciable change
to species
population; medium-
term (≤10 years)
detriment to
ecosystem function.
Measurable impact on travel and
water/air quality.
 
Significant
adverse media coverage /
transient public outrage.
Uncertainty securing or
retaining essential
approval / license.
Medical Treatment –
permanent
incapacitation.
 
Avoiding event recurrence
requires modification to established
corrective action procedures
.
Change to regulations
(tax; bonds; standards).
4
Major
USD $10.0
million to $50.0
million
1 to 2 weeks
Change to species
population
threatening viability;
long-term (>10
years) detriment to
ecosystem function.
Long-term, serious impact on
travel and use of water
resources; degradation of air
quality; sustained and effective
public opposition.
Suspension / long-delay
in securing essential
approval / license.
Fatality.
 
Avoiding event recurrence
requires modification to established
corrective action procedures and staff
retraining.
Change to laws (tax;
bonds; standards).
5
Critical
>USD $50.0
million
>1 month
Species extinction;
irreversible damage
to ecosystem
function.
Loss of social license.
Withdraw / failure to
secure essential
approval / license.
Multiple fatalities.
 
Avoiding event
recurrence requires major overhaul of
policies and procedures.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
60
The lowest rated
 
consequence is assigned
 
the value of
 
1 and is
 
described as Insignificant
Consequence, parameters of
 
which include non-reportable
 
safety incidents with
 
zero days
lost accidents,
 
no environmental
 
damage, loss
 
of production
 
or systems
 
for less
 
than one
week and cost
 
of less than
 
USD $0.5 million.
 
Increasing values are
 
assigned to each
 
higher
consequence,
 
culminating
 
with
 
the
 
value
 
of
 
5
 
assigned
 
to
 
critical
 
consequences,
 
the
parameters of
 
which include
 
multiple-fatality accidents,
 
major environmental
 
damage, and
loss of production
 
or systems for
 
longer than one
 
month and cost
 
of greater than
 
USD $50.0
million.
Composite Risk Matrix R = P x C and Color-Code Convention
The risk level, defined
 
as the product of probability
 
of occurrence and consequence, ranges
in value
 
from 1
 
(lowest possible
 
risk) to
 
25 (maximum
 
risk level).
 
The values
 
are color-coded
to facilitate identification of the highest risk aspects.
Table 22-3:
 
Risk Matrix
P x C = R
Consequence (C)
Insignificant
Minor
Moderate
Major
Critical
1
2
3
4
5
Probability Level (P)
Remote
1
1
2
3
4
5
Unlikely
2
2
4
6
8
10
Possible
3
3
6
9
12
15
Likely
4
4
8
12
16
20
Almost
Certain
5
5
10
15
20
25
22.2.5
 
Categorization of Risk Levels and Color Code Convention
Very
 
high
 
risks
 
are
 
considered
 
to
 
be
 
unacceptable
 
and
 
require
 
corrective
 
action.
 
Risk
reduction measures must be applied to reduce very high risks to a tolerable level.
22.2.6
 
Description of the Coal Property
The Mon
 
Valley
 
Reserve (including Pangburn,
 
Shaner and Fallowfield
 
Areas) is
 
located in
Allegheny,
 
Washington,
 
and
 
Westmoreland
 
Counties,
 
Pennsylvania.
 
Mon
 
Valley
underground operations are projected
 
to commence in 2031
 
at the Mon Valley
 
Complex in
the large Upper
 
Freeport seam reserve
 
area.
 
Three mines are
 
planned, and each
 
will utilize
continuous
 
mining
 
methods.
 
The
 
initial
 
operation
 
is
 
designated
 
as
 
the
 
Pangburn
 
Mine;
subsequently,
 
the Shaner
 
Mine is
 
projected for
 
2037 and
 
followed by
 
the Fallowfield
 
Mine
in 2056.
 
The operations are
 
projected to utilize
 
continuous mining production
 
sections.
 
The
method provides continuity, preserving skilled work groups and
 
enabling effective utilization
of
 
production
 
equipment.
 
The
 
Upper
 
Freeport
 
seam
 
is
 
below
 
drainage
 
and
 
therefore
 
all
mines will be accessed with slopes and shafts.
 
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
61
22.2.7
 
Summary of Residual Risk Ratings
Each
 
risk
 
factor
 
is
 
numbered,
 
and
 
a
 
risk
 
level
 
for
 
each
 
is
 
determined
 
by
 
multiplying
 
the
assigned
 
probability
 
by
 
the
 
assigned
 
consequence.
 
The
 
risk
 
levels
 
are
 
plotted
 
on
 
a
 
risk
matrix to
 
provide a
 
composite view
 
of the
 
Coronado risk
 
profile.
 
The average
 
risk level
 
is
8.4, which is defined as Moderate.
Table 22-4:
 
Risk Assessment Matrix
 
 
 
 
 
 
 
 
 
Consequence
Critical
>$50 MM
9, 10
 
 
 
 
 
Major
$10-50MM
 
4
1, 2, 3
6
 
 
Moderate
$2-10 MM
 
12
 
 
 
 
Minor
$0.5-$2 MM
 
 
7, 13
5
8
 
Low
<$0.5 MM
 
 
11
 
 
 
 
<10%
10-30%
30-60%
60-90%
>90%
 
Remote
Unlikely
Possible
Likely
Almost
Certain
22.2.8
 
Risk Factors
A high-level approach is utilized
 
to characterize risk factors that
 
are generally similar across
a number
 
of the
 
active and
 
proposed mining operations.
 
Risk factors that
 
are unique
 
to a
specific operation or are particularly noteworthy are addressed individually.
22.2.8.1
 
Geological and Coal Resource
Coal
 
mining
 
is accompanied
 
by
 
risk
 
that,
 
despite
 
exploration
 
efforts,
 
mining
 
areas
 
will
 
be
encountered
 
where
 
geological
 
conditions
 
render
 
extraction
 
of
 
the
 
resource
 
to
 
be
uneconomic,
 
or
 
that
 
coal
 
quality
 
characteristics
 
disqualify
 
the
 
product
 
for
 
sale
 
into
 
target
markets.
To
 
illustrate
 
these
 
points,
 
the
 
Upper
 
Freeport
 
coal
 
seam
 
deposits
 
at
 
Mon
 
Valley
 
are
examined.
 
The coal is deposited
 
in large, elliptical
 
pods.
 
During deposition, the
 
raised peat
deposits were
 
surrounded by
 
areas void
 
of peat
 
and deposited
 
instead with
 
dirt, clay,
 
and
stream channels.
 
Consequently,
 
the perimeter
 
of the
 
peat, and
 
consequent coal
 
deposits
may contain significantly higher concentration of ash and sulfur, and reduced product yield.
 
The
 
perimeter
 
deposits
 
may
 
also
 
be
 
affected
 
by
 
immediate
 
roof
 
and
 
floor
 
conditions
 
that
adversely affect mining cost and
 
productivity.
 
Meandering sandstone channels may
 
reduce
coal seam
 
thickness by
 
scouring action
 
at the
 
top of
 
the coal
 
seam and
 
support the
 
migration
of sulfur to the Upper Freeport seam.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
62
Offsetting
 
the
 
geological
 
and
 
coal
 
resource
 
risk
 
are
 
the
 
massive
 
size
 
of
 
the
 
controlled
property which
 
allows large
 
areas to
 
be mined
 
in the
 
three designated
 
mine areas
 
sufficiently
away from
 
areas where
 
coal quality
 
and mineability
 
are less
 
favorable.
 
In addition,
 
the mines
are
 
designed
 
to
 
operate
 
with
 
multiple
 
production
 
sections,
 
which
 
lessens
 
the
 
immediate
impact
 
when
 
one
 
section
 
encounters
 
difficulties.
 
The
 
large
 
reserve
 
areas
 
also
 
provide
 
a
mitigation strategy
 
of developing
 
an additional
 
(spare) section
 
at each
 
mine which
 
can be
activated
 
when
 
adverse
 
conditions
 
are
 
encountered,
 
thereby
 
maintaining
 
consistent
production
 
and
 
quality.
 
The
 
spare
 
section
 
requires
 
additional
 
mine
 
extension
 
cost
 
but
increases flexibility and performance consistency.
Table 22-5:
 
Geological and Coal Resource Risk Assessment (Risks 1 and 2)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Recoverable coal
tonnes recognized to
be significantly less
than previously
estimated.
Reserve base is
adequate to serve
market commitments
and respond to
opportunities for many
years.
 
Local adverse
conditions may increase
frequency and cost of
production unit
relocations.
Previous and ongoing
exploration and
extensive regional
mining history provide
a high level of
confidence of coal
seam correlation,
continuity of the coal
seams, and coal
resource tonnes.
4
4
16
Optimize mine
plan to increase
resource
recovery;
develop mine
plan to provide
readily available
alternate mining
locations to
sustain expected
production level.
3
4
12
Coal quality locally
proves to be lower
than initially
projected.
If uncontrolled,
production and sale of
coal that is out of
specification can result in
rejection of deliveries,
cancellation of coal sales
agreements and damage
to reputation.
Exploration and vast
experience and history
in local coal seams
provide confidence in
coal quality; limited
excursions can be
managed with careful
product segregation
and blending.
3
5
15
Develop mine
plan to provide
readily available
alternate mining
locations to
sustain expected
production level;
modify coal
sales
agreements to
reflect coal
quality.
3
4
12
22.2.8.2
 
Environmental
Water quality
 
and other permit
 
requirements are subject to
 
modification and such
 
changes
could have a material
 
impact on the capability
 
of the operator to
 
meet modified standards or
to receive new permits and modifications
 
to existing permits.
 
Permit protests may result in
delays or denials to permit applications.
Environmental standards and
 
permit requirements have
 
evolved significantly over
 
the past
50
 
years
 
and
 
to-date,
 
mining
 
operators
 
and
 
regulatory
 
bodies
 
have
 
been
 
able
 
to
 
adapt
successfully to evolving environmental requirements.
The
 
Residual
 
Risk
 
has
 
is
 
projected
 
to
 
be
 
slightly
 
higher
 
for
 
the
 
PA
 
reserves
 
due
 
to
 
the
proximity
 
of
 
the
 
rivers and
 
the
 
residual
 
environmental
 
complaints,
 
in
 
the
 
vicinity,
 
left
 
from
mining in the past.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
63
Table 22-6:
 
Environmental (Risks 3 and 4)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Environmental
performance
standards are
modified in the
future.
Delays in receiving new
permits and modifications
to existing permits; cost
of testing and treatment
of water and soils
Work with regulatory
agencies to
understand and
influence final
standards; implement
testing, treatment and
other actions to
comply with new
standards.
3
4
12
Modify mining
and reclamation
plans to improve
compliance with
new standards
while reducing
cost of
compliance.
3
4
12
New permits and
permit modifications
are increasingly
delayed or denied.
Interruption of production
and delayed
implementation of
replacement production
from new mines.
Comply quickly with
testing, treatment and
other actions required;
continue excellent
compliance
performance within
existing permits.
2
4
8
Establish and
maintain close
and constructive
working
relationships with
regulatory
agencies, local
communities and
community
action groups.
2
4
8
22.2.8.3
 
Regulatory Requirements
Federal and state health and
 
safety regulatory agencies occasionally
 
amend mine laws and
regulations.
 
The impact
 
is industry-wide.
 
Mining operators
 
and regulatory
 
agencies have
been able to adapt successfully to evolving health and safety requirements.
Table 22-7:
 
Regulatory Requirements (Risk 5)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Federal and state
mine safety and
health regulatory
agencies amend
mine laws and
regulations.
Cost of training,
materials, supplies and
equipment; modification
of mine examination and
production procedures;
modification of mining
plans.
Participate in hearings
and workshops when
possible to facilitate
understanding and
implementation; work
cooperatively with
agencies and
employees to facilitate
implementation of new
laws and regulations.
4
3
12
Familiarity and
experience with
new laws and
regulations
results in
reduced impact
to operations and
productivity and
improved
supplies and
equipment
options.
4
2
8
22.2.8.4
 
Market and Transportation
Most
 
of
 
the
 
current
 
and
 
future
 
production
 
is
 
expected
 
to
 
be
 
directed
 
to
 
domestic
 
and
international metallurgical
 
markets.
 
Historically the
 
metallurgical markets
 
have been
 
cyclical
and highly volatile.
 
The Mon Valley
 
business plan assumes
 
that 75 percent
 
of production can
 
be sold
 
into the
favorably
 
priced
 
metallurgical
 
market.
 
The
 
mining
 
plan
 
must
 
minimize
 
exposure
 
to
 
the
perimeter reserves where quality may not
 
be suitable for the market plan
 
and be flexible to
manage exposure to areas where coal quality fails to meet metallurgical standards.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
64
Table 22-8:
 
Market and Transportation (Risks 6 and 7)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Volatile coal prices
drop precipitously.
Loss of revenue
adversely affects
profitability; reduced
cash flow may disrupt
capital expenditures
plan.
Cost control measures
implemented; capital
spending deferred.
4
5
20
High-cost
operations
closed, and
employees
temporarily
furloughed.
4
4
16
Coal quality at Mon
Valley Upper
Freeport mines is
not adequate to
support 100 percent
metallurgical sales.
Reduced revenue from a
percentage of thermal
sales jeopardizes
financial performance
and expectations.
Lower preparation
plant gravities for ash
and sulfur reduction;
segregate lower
quality coal when
possible and manage
shipped quality by
blending.
3
5
15
Adjust mine
plan to keep
minimize
exposure to
perimeter coal
and sandstone
channels;
provide spare
section to
sustain
production and
quality when low
quality areas are
encountered.
3
2
6
Occasional delay
 
or interruption
 
of rail,
 
river and
 
terminals service
 
may be
 
expected.
 
The
operator
 
can
 
possibly
 
minimize
 
the
 
impact
 
of
 
delays
 
by
 
being
 
a
 
preferred
 
customer
 
by
fulfilling shipment obligations promptly and maintaining close working relationships.
Table 22-9:
 
Market and Transportation (Risk 8)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Rail or river transport
is delayed; storage
and shipping access
at river and ocean
terminals is not
available.
Fulfillment of coal sales
agreements delayed;
limited coal storage at
mines may increase cost
of rehandling; production
may be temporarily idled.
Provide adequate
storage capacity at
mines; coordinate
continuously with
railroad and shipping
companies to respond
quickly and effectively
to changing
circumstances.
5
3
15
Provide back-up
storage facility
along with
personnel,
equipment and
rehandle plan to
sustain
production and
fulfill sales
obligations
timely.
5
2
10
22.2.8.5
 
Mining Plan
Occupational
 
health
 
and
 
safety
 
risks
 
are
 
inherent
 
in
 
mining
 
operations.
 
Comprehensive
training
 
and
 
retraining
 
programs,
 
internal
 
safety
 
audits
 
and
 
examinations,
 
regular
 
mine
inspections,
 
safety meetings,
 
along
 
with
 
support
 
of
 
trained fire
 
brigades
 
and mine
 
rescue
teams are among activities that greatly reduce accident risks.
 
Employee health monitoring
programs
 
coupled
 
with
 
dust
 
and
 
noise
 
monitoring
 
and
 
abatement
 
reduce
 
health
 
risks
 
to
miners.
 
As
 
underground
 
mines
 
are
 
developed
 
and
 
extended,
 
observation
 
of
 
geological,
hydrogeological
 
and
 
geotechnical
 
conditions
 
lead
 
to
 
modification
 
of
 
mine
 
plans
 
and
procedures to enable safe work within the mine environments.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
65
Highlighted below
 
are selected
 
examples of
 
safety and
 
external factors
 
relevant to
 
Coronado
operations.
22.2.8.5.1 Methane Management
Coalbed
 
methane
 
is
 
present
 
in
 
coal
 
operations
 
below
 
drainage.
 
Often
 
the
 
methane
concentration is at such low levels that
 
it can be readily managed with frequent testing and
monitoring, vigilance, and routine mine ventilation.
 
Very high methane concentrations may
be present
 
at greater
 
depths.
 
High methane
 
concentrations may
 
require degasification
 
of
the coal seam to assure safe mining.
 
Table 22-10:
 
Methane Management (Risk 9)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Methane hazard is
present in mines
operating below
drainage.
Injury or loss of life;
possible ignition of gas
and mine explosion;
potential loss of mine and
equipment temporarily or
permanently; additional
mine fan, mine power,
ventilation, monitoring
and examination
requirements.
Low to moderate levels
can be managed with
frequent examinations,
testing and monitoring
within the mine
ventilation system.
 
Excellent rock dust
maintenance
minimizes explosion
propagation risk should
an ignition occur.
1
5
5
Very high-level
methane
concentrations
may require coal
seam
degasification
and gob
degasification if
longwall or pillar
extraction
methods are
employed.
1
5
5
22.2.8.5.2 Mine Fires
Mine fires, once common at mine operations, are rare today.
 
Most active coal miners have
not encountered
 
a mine
 
fire.
 
Vastly improved mine
 
power and
 
equipment electrical
 
systems,
along with safe
 
mine practices reduce
 
mine fire risks.
 
Crew training
 
and fire brigade
 
support
and
 
training
 
improve response
 
for containment
 
and
 
control if
 
a
 
fire occurs.
 
Spontaneous
combustion
 
within
 
coal
 
mines,
 
which
 
is
 
the
 
source
 
of
 
most
 
fires
 
that
 
occur
 
today,
 
is
 
not
expected
 
to
 
commonly
 
occur
 
at
 
the
 
Coronado
 
property.
 
When
 
spontaneous
 
combustion
conditions are present,
 
monitoring systems are
 
employed for
 
early detection and
 
mine plans
are designed to facilitate isolation, containment and rapid extinguishment.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
66
Table 22-11
 
:
 
Mine Fires (Risk 10)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Mine fire at
underground or
surface mine
operation.
Injury or loss of life;
potential loss of mine
temporarily or
permanently; damage to
equipment and mine
infrastructure.
Inspection and
maintenance of mine
power, equipment and
mine infrastructure;
good housekeeping;
frequent examination
of conveyor belt
entries; prompt
removal of
accumulations of
combustible materials.
1
5
5
If spontaneous
combustion
conditions are
present,
enhanced
monitoring and
examination
procedures will
be implemented;
mine design will
incorporate
features to
facilitate
isolation,
containment and
extinguishment
of spontaneous
combustion
locations.
1
5
5
22.2.8.5.3 Availability of Supplies and Equipment
The industry
 
has periodically
 
experienced difficulty receiving
 
timely delivery
 
of mine
 
supplies
and equipment.
 
Availability issues often accompanied boom periods
 
for coal demand.
 
Any
future delivery of supplies and equipment delays
 
are expected to be temporary with
 
limited
impact on production.
Table 22-12:
 
Availability of Supplies and Equipment (Risk 11)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Disruption of
availability for
supplies and
equipment.
Temporary interruption
of production.
Force majeure
provision in coal sales
agreements to limit
liability for delayed or
lost sales.
3
2
6
Work closely
with customers
to assure
delayed coal
delivery rather
than cancelled
sales; monitor
external
conditions and
increase
inventory of
critical supplies;
accelerate
delivery of
equipment when
possible.
3
1
3
22.2.8.5.4 Labor
Work
 
stoppage
 
due
 
to
 
labor
 
protests
 
are
 
considered
 
to
 
be
 
unlikely
 
and
 
accompanied
 
by
limited impact
 
should it
 
occur.
 
Excellent employee
 
relations and
 
communications limit
 
the
exposure to outside protesters.
 
Loss of supervisors and skilled
 
employees to retirement is
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
67
inevitable; the
 
impact can
 
be lessened
 
with succession
 
planning, training,
 
and mentorship
of new employees.
These
 
will
 
be
 
new
 
mines
 
in
 
an
 
historically
 
United
 
Mine
 
Workers
 
of
 
America
 
(
UMWA
)
represented area.
 
Newer mines in the area
 
are not represented so the
 
precedent has been
set.
 
However,
 
the Residual
 
risk is
 
shown as
 
slightly elevated
 
over some
 
other Coronado
properties.
Table 22-13:
 
Labor – Work Stoppage (Risk 12)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Work stoppage due
to strikes, slowdowns
or secondary boycott
activity.
Loss of production and
coal sales; damaged
customer and employee
relations; reputation loss.
Maintain excellent
employee relations
and communications;
maintain frequent
customer
communications.
2
3
6
Develop plan for
employee
communications
and legal support
to minimize
impact of
secondary
boycott activities.
2
3
6
Table 22-14:
 
Labor – Retirement (Risk 13)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk
Level
P
C
R
P
C
R
Retirement of
supervisors and
skilled employees.
Loss of leadership and
critical skills to sustain
high levels of safety,
maintenance and
productivity.
Monitor demographics
closely and maintain
communications with
employees who are
approaching
retirement age;
maintain employee
selection and training
programs.
3
3
9
Maintain
selection of
candidates and
implementation
of in-house or
third-party
training for
electricians and
mechanics;
develop
employee
mentoring
program.
3
2
6
23
Recommendations
Coronado
 
is continuing
 
to
 
work both
 
internally and
 
with
 
outside
 
assistance
 
to
 
continue to
further define their Resource Base and to Optimize the LOM Plan.
24
References
Publicly
 
available
 
information
 
from
 
various
 
State
 
and
 
Federal
 
agencies
 
was
 
used
 
where
relevant.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December
 
31, 2021
 
Northern Appalachian Coal Basin
Pennsylvania, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
68
25
Reliance on Information Provided by the
Registrant
For the
 
purpose of
 
this TRS,
 
MM&A utilized
 
the Geological
 
data provided
 
by Coronado.
 
This
information was subjected to verification of its integrity and completeness.
Historical
 
productivity
 
and
 
operating
 
costs
 
were
 
also
 
supplied
 
by
 
Coronado.
 
This
information
 
was combined
 
with the
 
experience and
 
knowledge of
 
the QPs
 
to forecast
 
the
LOM plan.
A summary of the
 
information provided by Coronado
 
relied upon by
 
MM&A for the purposes
of this TRS is provided in
Table
 
25-1
.
Table 25-1:
 
Information from Registrant Relied Upon by MM&A
 
Category
Information Provided by Coronado
Report
Section
Legal
Mineral control and surface control rights as shown on maps
3.2, 3.3
Geological
Geologic data including digital databases and original source
 
data
including geologist logs, driller’s logs, geophysical logs
9.1
Coal Quality
Database of coal quality information supplemented with
 
original
source laboratory sheets where available
10.1
Mining
Historical productivities and manpower from operating and future
Coronado mines
13.2, 13.4
Coal Preparation
Flow sheet and other information representing current
 
and future
methods of coal processing
 
14.1
Marketing
Long-term price forecast and market placement by seam
 
or mine
used in financial projections
16.2
Waste Disposal
Engineering data and estimates representing remaining
 
capacities
for coarse and fine coal waste disposal
17.2
Environmental
Permit and bonding information
17.3
Costs
Historical and budgetary operating cost information used to
 
derive
cost drivers for reserve financial modeling
18.2
Economic
WACC and inflation rate used in discounted
 
cash flow analysis
19.1, 19.2,
19.3
ex964p78i0.jpg
 
 
APPENDIX
A
BIOGRAPHIES
 
ex964p79i0.jpg
 
 
 
ex964p80i0.jpg
 
 
 
ex964p81i0.jpg
 
 
APPENDIX
B
MAPS
ex964p82i0.jpg
 
 
 
ex964p83i0.jpg
 
 
 
ex964p84i0.jpg
 
 
ex964p85i0.jpg
 
 
APPENDIX
C
GLOSSARY OF TERMS
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
Glossary of Abbreviations and Definitions
Abbreviation
Definition
AIPG
American Institute of Professional Geologists
ARMPS
Analysis of Retreat Mining Pillar Stability
ASTM
American Society for Testing
 
and Materials
AVS
Applicant Violator System
bcm
Bank cubic meters
Btu/lb.
British Thermal Unit per pound
CAT
®
Caterpillar Inc.
C.P.G
 
.
Certified Professional Geologist
Carlson
Carlson Mining – formerly SurvCADD
®
 
– a prevalent software package
used for modeling in the Appalachian region
CFR
Code of Federal Regulations
Coronado
Coronado Global Resources Inc.
 
CSR
Codes of State Rules
 
CSX
CSX Corporation, a rail-based freight transportation company
CTR
Contour mining
Demonstrated
reserves
Demonstrated reserves are the sum of proven and probable reserves.
DEP
Department of Environmental Protection
EBITDA
Earnings before Interest, Taxes,
 
Depreciation, and Amortization
 
EOM
End-of-mine reclamation
EPA
United States Environmental Protection Agency
 
ESA
Limited Phase I Environmental Site Assessment
EVR
Estimated Visual Recovery
Feasibility Study
“…comprehensive technical and economic study of the selected
development option for a mineral project, which includes detailed
assessments of all applicable modifying factors together with any other
relevant operational factors, and detailed financial analysis that are
necessary to demonstrate, at the time of reporting, that extraction is
economically viable.
 
According to the proposed definition, the results of
the study may serve as the basis for a final decision by a proponent or
financial institution to proceed with, or finance, the development of the
project. Thus, a feasibility study is more comprehensive, with a higher
degree of accuracy, and yielding results with a higher level of
confidence, than a pre-feasibility study.”
 
Hitachi
Hitachi Construction Machinery Co., Ltd.
HWM
Highwall mining
In situ
Its natural position; said specific of a rock, soil, or fossil when in the
situation in which was originally formed or deposited
Indicated
Resources
Indicated
 
resources
 
are
 
those
 
lying
 
between
 
0.4-kilometer
 
and
 
1.2-
kilometer radius
 
from such
 
an observation
 
point and
 
reported herein
 
as
in-situ mineral resources.
Inferred
Resources
Inferred resources lie more than a 1.2-kilometer radius from a valid point
of
 
measurement
 
but
 
less
 
than
 
4.8
 
kilometers
 
from
 
one
 
and
 
reported
herein as in-situ mineral resources.
JORC Code
Australasian
 
Code
 
for
 
Reporting
 
of
 
Exploration
 
Results,
 
Mineral
Resources and Ore Reserves
lb. SO
2
 
/ mm Btu
Pounds per sulfur dioxide per million British thermal units
LJ Hughes
LJ Hughes & Sons, Inc. - drilling Company
LOM
Life-of-mine
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Abbreviation
Definition
M&R
Maintenance and repair
M.B.A.
Master of Business Administration
Measured
Resources
Measured resources are those lying within 0.4-kilometer radius from a
valid point of measurement and reported herein as in-situ mineral
resources.
MINER Act
Mine Improvement and New Emergency Response Act of 2006
 
Mineral Reserve
“…the economically mineable part of a Measured and/or Indicated
Mineral Resource.
 
It includes dilution materials and allowances for
losses, which occur when the material is mined or extracted and is
defined by studies at Preliminary Feasibility or Feasibility level as
appropriate that include Modifying Factors.
 
Such studies demonstrate
that, at the time of reporting, extraction of the mineral reserve is
economically viable under reasonable investment and marketing
assumptions.”
 
Mineral Resource
“…a concentration or occurrence of solid material of economic interest
or on the Earth’s crust in such form, grade or quality that there are
reasonable prospects for eventual economic extraction.
 
The location,
quantity, grade, continuity and other geological characteristics and
continuity of a Mineral Resource are known, estimated or interpreted
from specific geological evidence and knowledge, including sampling.”
 
MM&A
Marshall Miller & Associates, Inc.
Modifying Factors
“…considerations used to convert Mineral Resources to Mineral
Reserves. These include, but are not restricted to, mining, processing,
metallurgical, infrastructure, economic, marketing, legal, environmental
compliance, plans, negotiations, or agreements with local individuals or
groups and governmental factors.”
MRMR
Mineral Resources to Mineral Reserves
MSHA
United States Department of Labor Mine Safety and Health
Administration
MSL
Mean sea level
Mt
Million metric tonnes
NAIP
National Agricultural Imagery Program
NIOSH
National Institute for Occupational Safety and Health
NS
Norfolk Southern Corporation, a rail-based freight transportation
company
O&M
Operating and maintenance
 
OSD
Out-of-seam dilution
OSM
U.S. Office of Surface Mining Reclamation and Enforcement
P&L
Profit and loss before tax
 
P.E.
Professional Engineer
Preliminary
Feasibility Study
“…as a comprehensive study of a range of options for the technical and
economic viability of a mineral project that has advanced to a stage
where a qualified person has determined (in the case of underground
mining) a preferred mining method, or in the case of surface mining) a
pit configuration, and in all cases has determined an effective method of
mineral processing and an effective plan to sell the product. The study’s
financial analysis must have the level of detail necessary to
demonstrate, at the time of reporting, that extraction is economically
viable. In addition, as noted in the proposed definition of a pre-feasibility
study,
 
while a pre-feasibility study is less comprehensive and results in
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
Abbreviation
Definition
a lower confidence level than a feasibility study, a pre- feasibility study
is more comprehensive and results in a higher confidence level than an
initial assessment.”
 
Property(ies)
Bituminous coal deposits located in southwestern Pennsylvania.
 
The
Pennsylvania properties include the combined Pangburg, Shaner, and
Fallowfield underground mines in the Upper Freeport seam.
 
QP
Qualified Person
Qualified Person
“…a person who is a mineral industry professional with at least five
years of relevant experience in the type of mineralization and type of
deposit under consideration and in the specific type of activity that
person is undertaking on behalf of the registrant. In addition, the
proposed definition requires a qualified person to be an eligible member
or licensee in good standing of a recognized professional organization
at the
time the technical report is prepared.”
Rec.
Recovery
RECs
Recognized Environmental Conditions
Resource
Database
The Resource Database is established by the collection, validation,
recording, storing and processing of data and forms the foundation
necessary for the estimation of Mineral Resource and Mineral Reserve.
 
A quality assurance and quality control program is essential and must
be established to govern the collection of all data.
 
In reporting, a
Mineral Resource must meet the minimum requirement of “reasonable
prospects for economic extraction”. This will require the concurrent
collection and storage of preliminary economic, mining, metallurgical,
environmental, legal and social data and other information for use in the
estimation of MRMR.
 
The Resource Database will include both “primary” (observation and
measurement) and “interpreted” data. It is recommended that data be
stored digitally, using a documented, standard format and a reliable
storage medium that allows for easy and complete retrieval of the data.
ROM
Run-of-mine
RPO
Recognized Professional Organizations
S-K 1300
United States Securities and Exchange Commission Regulation S-K
1300 Modernization of Property Disclosures
SEC
U.S. Securities and Exchange Commission
SME
Society for Mining Engineers
SMCRA
Surface Mining Control and Reclamation Act of 1977 is the primary
federal law that regulates the environmental effects of coal mining in the
United States.
Strip Ratio
Represented by bcm of overburden to recoverable coal tonnes
 
tph
tonnes per hour
 
TRS
Technical
 
Report Summary
USA
United States of America
USGS
United States Geologic Survey
 
VALMIN Code
Australasian Code for Public Reporting of Technical
 
Assessments and
Valuations of Mineral Assets
 
 
 
 
 
 
 
 
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Abbreviation
Definition
Vulcan™
Vulcan™ software is a product of Maptek™, a provider of software for
the global mining industry.
ex964p90i0.jpg
 
 
APPENDIX
D
JORC TABLE 1
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling
techniques
>
Nature and quality of sampling (e.g. cut channels, random
 
chips, or specific
specialised industry standard measurement tools appropriate
 
to the minerals
under investigation, such as downhole gamma
 
sondes, or handheld XRF
instruments, etc.). These examples should not be
 
taken as limiting the broad
meaning of sampling.
>
Include reference to measures taken to ensure sample
 
representivity and the
appropriate calibration of any measurement tools
 
or systems used.
>
Aspects of the determination of mineralisation that are
 
Material to the Public
Report. In cases where ‘industry standard’ work has
 
been done this would be
relatively simple (e.g. ‘reverse circulation drilling
 
was used to obtain 1 m
samples from which 3 kg was pulverised to produce a
 
30 g charge for fire
assay’). In other cases, more explanation may be
 
required, such as where
there is coarse gold that has inherent sampling
 
problems. Unusual
commodities or mineralisation types (e.g. submarine nodules)
 
may warrant
disclosure of detailed information.
>
 
Most of the coal samples have been obtained
 
from the Properties by subsurface
exploration using core drilling techniques.
 
The protocol for preparing and testing
the samples has varied over time and is not well
 
documented for the older holes
drilled on the Properties.
>
 
Typical USA core drilling sampling technique is for the coal core sample,
 
once
recovered from the core barrel, to be described then wrapped
 
in a sealed plastic
sleeve and placed into a covered core box, which
 
is the length of the sample so
that the core can be delivered to a laboratory in relatively
 
intact condition and with
original moisture content.
>
 
It is reasonable to assume, given the sophistication
 
level of the previous operators,
that these samples were generally collected and processed
 
under industry best-
practices.
 
This assumption is based on MM&A’s familiarity with the operating
companies and the companies used to perform the
 
analysis.
 
>
 
Some of the drill holes were air rotary bored and
 
no coal core samples were
collected.
 
Seam thickness for rotary-drilled bore holes is
 
verified by calibrated
downhole gamma-density logs.
 
>
 
Coal samples that were deemed by MM&A geologists
 
to be unrepresentative were
not used for statistical analysis of coal quality, as documented in the
 
tabulations. A
representative group of drill hole samples from
 
the Properties were then checked
against the original drill laboratory reports to
 
verify accuracy and correctness.
 
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Criteria
JORC Code explanation
Commentary
Drilling
techniques
>
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
 
blast,
auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit
 
or other type, whether core is
oriented and if so, by what method, etc.).
>
 
The Properties have been extensively explored
 
by subsurface drilling efforts carried
out by numerous entities, most of which were completed
 
prior to acquisition by
Coronado.
 
The majority of the drilling was accomplished using
 
vertical continuous
(diamond) coring or air rotary methods.
>
 
Core drilling methods utilize NX-size (5.4 centimeter)
 
or similar-sized core cylinders
to recover core samples, which can be used
 
to delineate geologic characteristics,
and for coal quality testing and geotechnical logging.
 
>
 
Data for the rotary drilled holes is mainly derived
 
from downhole geophysical logs,
which are used to interpret coal and rock thickness
 
and depth since logging of the
drill cuttings is not reliable.
>
 
Geophysical logging was performed on many of
 
the holes, either by Geological
Logging Systems (a division of MM&A), other
 
geophysical logging contractors, and
on those properties acquired from CONSOL geophysical
 
logging was often
performed by CONSOL’s in-house logging services.
Drill sample
recovery
>
 
Method of recording and assessing core and chip
 
sample recoveries and
results assessed.
>
 
Measures taken to maximise sample recovery and
 
ensure representative
nature of the samples.
>
 
Whether a relationship exists between sample
 
recovery and grade and
whether sample bias may have occurred due to
 
preferential loss/gain of
fine/coarse material.
>
 
Where available, core recovery thickness of coal samples was
 
reconciled with the
thickness interpreted from geophysical logs.
>
 
Core recovery of the older coal samples lacking
 
geophysical logs is sometimes not
well-documented: however,
 
when the laboratory results for such holes had
anomalous values, the data was disqualified and not
 
used.
 
Logging
>
 
Whether core and chip samples have been geologically
 
and geotechnically
logged to a level of detail to support appropriate
 
Mineral Resource estimation,
mining studies and metallurgical studies.
>
 
Whether logging is qualitative or quantitative
 
in nature. Core (or costean,
channel, etc.) photography.
>
 
The total length and percentage of the relevant
 
intersections
 
logged.
>
 
A wide variety of core-logging techniques exist for
 
the properties.
 
For many of the
core holes, the primary data source is a generalized
 
lithology description by the
driller, in some cases supplemented by a more detailed core log
 
completed by a
geologist.
 
>
 
The logging of core thickness and depth is quantitative.
 
With the exception of the
coal seams, logging of rock strata type is more subjective
 
and best considered as
qualitative.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
Criteria
JORC Code explanation
Commentary
Sub-sampling
techniques and
sample
preparation
>
 
If core, whether cut or sawn and whether quarter, half or all
 
core taken.
>
 
If non-core, whether riffled, tube sampled, rotary split, etc.
 
and whether
sampled wet or dry.
>
 
For all sample types, the nature, quality and appropriateness
 
of the sample
preparation technique.
>
 
Quality control procedures adopted for all sub-sampling
 
stages to maximise
representivity of samples.
>
 
Measures taken to ensure that the sampling is representative
 
of the in situ
material collected, including for instance results for
 
field duplicate/second-half
sampling.
>
 
Whether sample sizes are appropriate to the grain
 
size of the material being
sampled.
>
 
Typical US practice in the Appalachian Basin is that core samples
 
for deep
mineable core samples are not sawn or subsampled (since
 
seams are not of great
thickness and the entire seam is mined and co-mingled).
>
 
Oftentimes, core for surface-mineable coal seams are
 
bench sampled separately
by the various coal and rock layers (plies).
>
 
MM&A has exercised diligence to use only those
 
analyses that are representative
of the coal quality parameters for the appropriate
 
mining type for each sample.
Quality of assay
data and
laboratory tests
>
 
The nature, quality and appropriateness of the assaying
 
and laboratory
procedures used and whether the technique is considered
 
partial or total.
>
 
For geophysical tools, spectrometers, handheld XRF
 
instruments, etc., the
parameters used in determining the analysis including
 
instrument make and
model, reading times, calibrations factors applied and
 
their derivation, etc.
>
 
Nature of quality control procedures adopted (e.g.
 
standards, blanks,
duplicates, external laboratory checks) and whether
 
acceptable levels of
accuracy (i.e. lack of bias) and precision have
 
been established.
>
 
Sample analysis was typically carried out by accredited
 
US laboratories.
 
>
 
Standard procedure upon receipt of core samples
 
by the testing laboratory is to log
the depth and thickness of the sample, then perform
 
testing as specified by a
representative of the operating company.
 
Each sample is then analyzed in
accordance with procedures defined under
American Society for Testing and
Materials (
ASTM
)
 
standards including, but not limited to; washability
 
(ASTM
D4371); ash (ASTM D3174); sulfur (ASTM D4239);
 
Btu/lb. (ASTM D5865); volatile
matter (ASTM D3175); Free Swell Index (
FSI
) (ASTM D720).
>
 
Geophysical tools are calibrated by the logging
 
company and where possible,
validated using a calibration hole.
Verification of
sampling and
assaying
>
 
The verification of significant intersections by either
 
independent or alternative
company personnel.
>
 
The use of twinned holes.
>
 
Documentation of primary data, data entry procedures,
 
data verification, data
storage (physical and electronic) protocols.
>
 
Discuss any adjustment to assay data.
>
 
All coal intersection data used to generate the geologic
 
model has been cross
referenced with the lithological and geophysical logs
 
by MM&A.
>
 
Laboratory quality was adjusted from dry basis to reflect
 
the anticipated marketable
product moisture.
>
 
Coal quality results were verified by spot-check with
 
laboratory analysis sheets by
MM&A before inclusion into the geologic model
 
and use in the resource estimate.
Location of data
points
>
 
Accuracy and quality of surveys used to locate drill
 
holes (collar and down-
hole surveys), trenches, mine workings and other
 
locations used in Mineral
Resource estimation.
>
 
Specification of the grid system used.
>
 
Quality and adequacy of topographic control.
>
 
Due to the long history of exploration by various
 
parties on the Properties, a wide
variety of survey techniques exist for documentation of
 
data point locations.
 
Many
of the older exploration drill holes appear to have
 
been located by ground survey;
more recently completed drill holes are often located
 
by high-resolution Global
Positioning System (
GPS
) units.
>
 
Grid systems used are typically the State Plane Coordinate
 
System pertinent to
each property.
 
>
 
Topography is based on either the USGS topographic 7.5-minute quadrangle maps
or on recent aerial photogrammetry as necessary
 
(subject to availability).
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Criteria
JORC Code explanation
Commentary
Data spacing and
distribution
>
 
Data spacing for reporting of Exploration Results.
>
Whether the data spacing and distribution is sufficient
 
to establish the
degree of geological and grade continuity appropriate
 
for the Mineral
Resource and Ore Reserve estimation procedure(s)
 
and classifications
applied.
>
 
Whether sample compositing has been applied.
>
 
Spacing and distribution of data point information
 
may vary from seam to seam
within each mining area.
 
The areas estimated for coal resource and
 
coal reserve
tonnes have been limited so that the data spacing
 
and distribution is sufficient to
establish the degree of geological continuity appropriate
 
for the estimation and
classification of the coal tonnes.
 
>
 
All of the coal resource tonnes are in the measured,
 
indicated, and inferred
categories, and all of the coal reserve tonnes are in
 
the proved and probable
categories in accordance with the JORC Code and
 
SEC standards.
 
Orientation of
data in relation to
geological
structure
>
 
Whether the orientation of sampling achieves unbiased
 
sampling of possible
structures and the extent to which this is
 
known, considering the deposit type.
>
 
If the relationship between the drilling orientation and
 
the orientation of key
mineralised structures is considered to have introduced
 
a sampling bias, this
should be assessed and reported if material.
>
 
Drill holes have been vertically drilled.
 
No downhole deviation logs have been
collected and it is therefore not known
 
if the drill holes have deviated away from
vertical.
 
Based on the relatively shallow seam depths,
 
any deviation is expected to
be insignificant and immaterial to the geologic
 
characterization of the property.
>
 
The dip of the coal seams is relatively minor
 
and not a material issue for
representation of seam thickness or quality.
Sample security
The measures taken to ensure sample security.
>
 
Sample handling procedures employed by explorationists
 
follow typical US protocol
and should be adequate to insure sample security.
Audits or reviews
The results of any audits or reviews of
 
sampling techniques and data.
>
 
MM&A has reviewed all available geological information
 
for the Properties in
developing the geologic model.
 
Only that data deemed suitable has been used
 
for
the purpose of generating the resource and reserve
 
estimates.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement
and land tenure
status
>
 
Type, reference name/number, location and ownership including agreements
or material issues with third parties such as joint
 
ventures, partnerships,
overriding royalties, native title interests, historical
 
sites, wilderness or national
park and environmental settings.
>
 
The security of the tenure held at the time of
 
reporting along with any known
impediments to obtaining a licence to operate
 
in the area.
>
 
The Coronado coal resources are located within three
 
of the United State of
America: Virginia; West Virginia; and Pennsylvania.
 
Control of these Properties is
governed by many hundreds of agreements.
>
 
MM&A has not carried out separate title verification for
 
the coal properties and has
not verified leases, deeds, surveys or other property
 
control instruments pertinent
to the subject resources.
 
>
 
Coronado has represented to MM&A that it controls
 
the mining rights to the coal
deposits as shown on its property maps, and
 
MM&A has accepted these as being
a true and accurate depiction of the mineral rights
 
controlled by Coronado.
 
The
TRS assumes the properties are developed under
 
responsible and experienced
management.
>
 
There are no known legal or environmental encumbrances
 
that would impede
development of the subject coal reserves.
Exploration done
by other parties
>
 
Acknowledgment and appraisal of exploration by other
 
parties.
>
 
The Properties have been extensively explored
 
by subsurface drilling efforts
carried out by numerous entities, most of which
 
were completed prior to acquisition
by Coronado.
>
 
This exploration work was generally performed to
 
prevailing US best practice
standards and deemed adequate for the purposes of
 
this TRS.
 
Geology
>
 
Deposit type, geological setting and style of mineralisation.
>
 
The Coronado coal resources are located within
 
the Northern and Central
Appalachian Coal Basins.
>
 
The coal deposits are Carboniferous in age, being
 
of the Pennsylvanian system.
>
 
Seam of economic significance typically range between
 
0.3 meters and 1.8 meters
in thickness, with relatively little structural deformation.
>
 
Regional structure is typically characterized by gently
 
dipping strata to the
northwest at less than one percent.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
Criteria
JORC Code explanation
Commentary
Drill hole
Information
>
 
A summary of all information material to the understanding
 
of the exploration
results including a tabulation of the following information
 
for all Material drill
holes:
●
 
easting and northing of the drill hole collar
●
 
elevation or RL (Reduced Level – elevation above
 
sea level in metres) of
the drill hole collar
●
 
dip and azimuth of the hole
●
 
down hole length and interception depth
●
 
hole length.
>
 
If the exclusion of this information is justified on
 
the basis that the information
is not Material and this exclusion does not detract
 
from the understanding of
the report, the Competent Person should clearly explain
 
why this is the case.
>
 
MM&A reviewed and entered all pertinent data into
 
a digital geologic database for
each Coronado property.
 
The database consists
 
of thousands of data records,
which include drill hole and supplemental coal
 
seam thickness measurements from
outcrop and mine exposures.
 
>
 
All drill holes in the database are provided with
 
a collar elevation and the State
Plane Coordinate System easting and northing coordinate.
>
 
After MM&A confirmed proper coal seam thickness and
 
correlation,
 
the seam data
was modelled and compiled into coal resource maps.
>
 
The maps are provided in the TRS; however, a tabulation of the thousands
 
of
individual data records is not practical to include.
Data aggregation
methods
>
 
In reporting Exploration Results, weighting averaging
 
techniques, maximum
and/or minimum grade truncations (e.g. cutting of high
 
grades) and cut-off
grades are usually Material and should be stated.
>
 
Where aggregate intercepts incorporate short lengths
 
of high grade results
and longer lengths of low grade results, the
 
procedure used for such
aggregation should be stated and some typical examples
 
of such
aggregations should be shown in detail.
>
 
The assumptions used for any reporting of
 
metal equivalent values should be
clearly stated.
>
 
Where a coal seam has been bench sampled
 
(typically for surface mining) the
individual analyses for the coal plies are normally
 
weight-averaged to represent the
total of recoverable coal.
>
 
Coal quality summary results have been documented
 
in the TRS.
 
Average coal
quality on a per-seam basis is used to represent
 
the coal resources within a given
mining area.
>
 
Average coal quality for each Coronado complex is provided
 
in Tables 1-1, 1-2 and
1-3 of this TRS.
 
>
 
No other data aggregations methods are used.
Relationship
between
mineralisation
widths and
intercept lengths
>
 
These relationships are particularly important in the
 
reporting of Exploration
Results.
>
 
If the geometry of the mineralisation with respect
 
to the drill hole angle is
known, its nature should be reported.
>
 
If it is not known and only the down hole lengths
 
are reported, there should be
a clear statement to this effect (e.g. ‘down hole length,
 
true width not known’).
>
 
Coal thickness values from all coal intersections
 
and down hole geophysical logs
are considered to be vertical thicknesses.
 
Seam dip of approximately 2.0 to 3.0
degrees has little effect on the vertical thickness of the
 
seam.
Diagrams
>
 
Appropriate maps and sections (with scales) and tabulations
 
of intercepts
should be included for any significant discovery being
 
reported These should
include, but not be limited to a plan view of
 
drill hole collar locations and
appropriate sectional views.
>
 
Diagrams and maps showing the coal seam intercepts are
 
presented in the TRS.
Balanced
reporting
>
 
Where comprehensive reporting of all Exploration Results
 
is not practicable,
representative reporting of both low and high grades
 
and/or widths should be
practiced to avoid misleading reporting of Exploration
 
Results.
>
 
All of the available,
 
qualified exploration data has been included
 
within the
tabulations, maps, and diagrams for this TRS.
>
 
Both coal thickness and quality data are deemed
 
by MM&A to be reasonably
sufficient within the resource areas. Therefore, there is a
 
reasonable level of
confidence in the geologic interpretations required for
 
coal resource determination
based on the available data and the techniques applied
 
to the data.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
Criteria
JORC Code explanation
Commentary
Other substantive
exploration data
>
 
Other exploration data, if meaningful and material,
 
should be reported
including (but not limited to): geological observations;
 
geophysical survey
results; geochemical survey results; bulk samples –
 
size and method of
treatment; metallurgical test results; bulk density, groundwater, geotechnical
and rock characteristics; potential deleterious or
 
contaminating substances.
>
 
Informational material available from the U.S. Geological
 
Survey and the respective
State Surveys was used to assist in the Resource
 
estimate.
 
Further work
>
 
The nature and scale of planned further work (e.g.
 
tests for lateral extensions
or depth extensions or large-scale step-out drilling).
>
 
Diagrams clearly highlighting the areas of possible
 
extensions, including the
main geological interpretations and future drilling areas,
 
provided this
information is not commercially sensitive.
>
 
Further work is expected to include additional exploration,
 
geotechnical testing,
coal quality analyses, and coal property acquisition.
 
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
Section 3 Estimation and Reporting of Mineral Resources
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Database
integrity
>
 
Measures taken to ensure that data has not been
 
corrupted by, for
 
example,
transcription or keying errors, between its initial collection and its use for
Mineral Resource estimation
 
purposes.
>
 
Data validation procedures
 
used.
>
 
MM&A confirmed coal seam thickness and correlations in databases
 
used for coal
deposit modelling.
 
Representative records were spot-checked for
 
data entry
validation.
 
>
 
Geophysical logs were used wherever available
 
to assist in confirming the seam
correlation and to verify proper seam thickness measurements
 
and recovery of coal
samples.
Site
visits
>
 
Comment on
 
any site
 
visits undertaken
 
by the
 
Competent Person and the
outcome of those visits.
>
 
If no
 
site visits
 
have been
 
undertaken indicate why
 
this is the case.
>
 
MM&A is very familiar with the Properties and
 
has conducted multiple site visits
throughout the years.
Geological
interpretation
>
 
Confidence in (or conversely,
 
the uncertainty
 
of) the geological interpretation
 
of
the mineral deposit.
>
 
Nature of the data used and of
 
any assumptions made.
>
 
The effect,
 
if any,
 
of alternative interpretations on
 
Mineral Resource estimation.
>
 
The use of geology in guiding
 
and controlling Mineral Resource estimation.
>
 
The factors affecting continuity both
 
of grade and geology.
>
 
Due to the relative structural simplicity of the deposits
 
and the reasonable continuity
of the tabular coal beds, the principal geological
 
interpretation necessary to define the
geometry of the coal deposits is the proper modeling
 
of their thickness and elevation.
 
>
 
Both coal thickness and quality data are deemed
 
by MM&A to be reasonable
 
within
the resource areas.
 
>
 
Therefore, there is a reasonable level of confidence in
 
the geologic interpretations
required for coal resource determination based on
 
the available data and the
techniques applied to the data.
Dimensions
>
 
The extent and variability of the Mineral Resource expressed as length (along
strike or otherwise), plan width, and depth below surface to the upper and lower
limits of the Mineral Resource.
>
 
The subject coal resource areas mostly exist in
 
discreet, individual deposits of highly
variable dimensions, shapes and depth below the
 
ground surface.
>
 
Such factors are best depicted in the maps contained
 
in the TRS.
>
 
Details of the parameters are cited within the TRS and
 
included in the table of Cut-off
Parameters listed in Section 11.1 of the TRS.
 
Estimation
and
modelling
techniques
>
 
The nature and appropriateness of the estimation technique(s) applied and key
assumptions, including
 
treatment of extreme grade values, domaining,
interpolation parameters and maximum distance of extrapolation from data
points. If a computer assisted estimation method was chosen include a
description of computer software and
 
parameters used.
>
 
The availability of check estimates, previous estimates and/or mine production
records and whether the Mineral Resource estimate takes
 
appropriate account
of
 
such data.
>
 
The assumptions made regarding
 
recovery of by-products.
>
 
Estimation of deleterious elements or other non-grade variables of economic
significance (e.g. sulphur for acid mine drainage characterisation).
>
 
Geological data was imported into Carlson Mining
®
 
(formerly SurvCADD
®
) geological
modelling software in the form of Microsoft
®
 
Excel files incorporating, drill hole collars,
seam and thickness picks, bottom seam elevations
 
and raw and washed coal quality.
These data files were validated prior to importing
 
into the software.
>
 
Once imported, a geologic model was created.
>
 
The geological model was verified and reviewed.
 
>
 
Resources were estimated by defining seam thickness
 
at each point of observation
and by defining resource confidence arcs around
 
the points of observation.
>
 
Points of observation for Measured and Indicated
 
confidence arcs were defined for all
drill holes that intersected the seam.
 
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
9
Criteria
JORC Code explanation
Commentary
>
 
In the case
 
of block model interpolation, the
 
block size in relation to the
average sample spacing and the search employed.
>
 
Any assumptions behind modelling of
 
selective mining units.
>
 
Any assumptions about
 
correlation between variables.
>
 
Description of how the
 
geological interpretation was used to control the
resource estimates.
>
 
Discussion of basis for using or not
 
using grade cutting or capping.
>
 
The process of validation, the
 
checking process used, the comparison of model
data to drill hole data, and
 
use of reconciliation data if available.
>
 
As prescribed by the common United States
 
classification system the following
distances from points of observation were used
 
to define the corresponding Resource
category arcs:
-
 
Inferred Resources – greater than 3,960 feet (1.2
 
kilometers) but less than 15,840
feet (4.8 kilometers)
-
 
Indicated Resources – 3,960 feet (1.2 kilometers)
-
 
Measured Resources – 1,320 feet (0.4 kilometers)
>
 
The use of the standards commonly used in the
 
United States are appropriate and
customary for this resource jurisdiction and deposition
 
type.
>
 
MM&A performed a geostatistical analysis test
 
of the Coronado data sets using the
Drill Hole Spacing Analysis (
DHSA
) method.
>
 
Based on MM&A’s analysis, it would be possible to extend the measured,
 
indicated
and inferred arcs slightly beyond historically accepted
 
practices due to consistent
geological settings. The QP’s have elected not to extend
 
arc distances, introducing a
level of conservatism in the coal classification.
Moisture
>
 
Whether the tonnages are estimated on a dry basis
 
or with natural moisture,
and the method of determination of the moisture
 
content.
>
 
Coal resource tonnes are presented on a dry, in-situ basis.
>
 
Reserve tonnes are presented on a moist basis at anticipated
 
product moisture
ranging from 4.0 to 6.0 percent. Moisture content based
 
on historic analyses of
shipped coal.
Cut-off
Parameters
>
 
The basis of the adopted cut-off grade(s) or quality parameters
 
applied.
>
 
The cut-off parameters were tailored for each of the
 
Coronado properties to be in
accordance with mining/ processing capabilities and
 
market conditions prevalent at
each operation.
>
 
Examples include minimum recoverable coal thickness,
 
acceptable ash content and
wash recovery, and manageable overburden to coal ratio for surface mineable
 
coal.
>
 
Details of the parameters are cited within the
 
TRS and included in the table of Cut-off
Parameters listed in Section 11.1 of this TRS.
>
 
These cut-off parameters have been developed by MM&A
 
based on its experience
with the Coronado properties and other mining
 
operations of the Central Appalachian
coal basin.
 
This experience includes technical and economic
 
evaluations of
numerous properties in the region for the purposes
 
of determining the economic
viability of the subject coal reserves.
Mining factors or
assumptions
>
 
Assumptions made regarding possible mining methods,
 
minimum mining
dimensions and internal (or, if applicable, external) mining dilution.
 
It is always
necessary as part of the process of determining
 
reasonable prospects for
eventual economic extraction to consider potential
 
mining methods, but the
assumptions made regarding mining methods and parameters
 
when estimating
Mineral Resources may not always be rigorous.
 
Where this is the case, this
>
 
Mining factors such as dilution, mining and washing
 
recovery are variable and have
been applied at the coal deposits at each operation
 
based on site-specific
characteristics.
>
 
Details of the factors are cited within the TRS.
>
 
Factors that would typically preclude conversion of a
 
coal resource to coal reserve
include the following: inferred resource classification;
 
absence of coal quality; poor
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
10
Criteria
JORC Code explanation
Commentary
should be reported with an explanation of the
 
basis of the mining assumptions
made.
mine recovery; lack of access; insufficient exploration; or
 
uncontrolled surface
property for areas of proposed for surface mining.
 
>
 
While such factors were used to preclude the conversion
 
of a very limited number of
coal resources to coal reserves in this report,
 
the extensive history of mining on the
Properties would suggest that there are reasonable prospects
 
for eventual economic
extractions of all coal resources under favorable
 
market conditions.
Metallurgical
factors or
assumptions
>
 
The basis for assumptions or predictions regarding
 
metallurgical amenability. It
is always necessary as part of the process of
 
determining reasonable prospects
for eventual economic extraction to consider potential
 
metallurgical methods,
but the assumptions regarding metallurgical treatment
 
processes and
parameters made when reporting Mineral Resources may
 
not always be
rigorous. Where this is the case, this should be reported
 
with an explanation of
the basis of the metallurgical assumptions made.
>
 
The products mined from coal resources controlled by
 
Coronado can be sold into
high-, mid-, and low-volatile metallurgical coal markets
 
because of their inherent
quality characteristics.
 
>
 
Run-of-mine production is washed at the coal preparation
 
plants as needed for quality
control.
 
>
 
Coronado may blend production from multiple
 
sources to manage ash and sulfur
content along with the rheological and petrographic
 
characteristics of the shipped
products.
 
Environmental
factors or
assumptions
>
 
Assumptions made regarding possible waste and
 
process residue disposal
options. It is always necessary as part of the process
 
of determining reasonable
prospects for eventual economic extraction to consider
 
the potential
environmental impacts of the mining and processing
 
operation.
 
While at this
stage the determination of potential environmental impacts,
 
particularly for a
greenfields project, may not always be well advanced,
 
the status of early
consideration of these potential environmental impacts
 
should be reported.
Where these aspects have not been considered
 
this should be reported with an
explanation of the environmental assumptions made.
>
 
MM&A completed a Limited Phase I Environmental Site
 
Assessment (ESA) on the
Buchanan property
 
in April 2016, and on the Logan County
 
and Greenbrier Properties
in May 2017 on behalf of Coronado.
 
Coronado reports not having conducted such
 
a
study since the MM&A studies.
 
>
 
The ESAs completed by MM&A included a site inspection,
 
review of historical
records, a database search of State and Federal
 
regulatory records and interviews to
identify potential recognized environmental conditions (RECs)
 
that may create
environmental liability for the sites.
 
>
 
MM&A identified one REC at Greenbrier associated
 
with stained soil and gravel near
a fueling and maintenance area.
 
Coronado reported to MM&A that satisfactory clean-
up efforts were completed at Greenbrier.
 
>
 
Based on these former ESAs completed by MM&A,
 
it is MM&A’s opinion that
Coronado has a generally typical coal industry
 
record of compliance with applicable
mining, water quality, and environmental laws.
 
Estimated costs for mine closure,
including water quality monitoring during site reclamation,
 
are included in the TRS
financial models.
 
Bulk density
>
 
Whether assumed or determined. If assumed, the
 
basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the
measurements, the nature, size and representativeness
 
of the samples.
>
 
The bulk density for bulk material must have been
 
measured by methods that
adequately account for void spaces (vugs, porosity, etc), moisture and
differences between rock and alteration zones within the deposit.
>
 
Discuss assumptions for bulk density estimates
 
used in the evaluation process
of the different materials.
>
 
Laboratory derived seam densities measured in specific
 
gravity were used where
available.
 
As needed, these data were supplemented by estimated
 
seam density
values based on the relative proportion of
 
coal and non-coal material within the seam
(typically at 1.30 and 2.25 specific gravity, respectively).
>
 
Average seam density was determined for each coal deposit
 
and used to convert coal
volumes into coal tonnage estimates.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
11
Criteria
JORC Code explanation
Commentary
Classification
>
 
The basis for the classification of the Mineral Resources
 
into varying confidence
categories.
>
 
Whether appropriate account has been taken
 
of all relevant factors (i.e. relative
confidence in tonnage/grade estimations, reliability
 
of input data, confidence in
continuity of geology and metal values, quality, quantity and distribution
 
of the
data).
>
 
Whether the result appropriately reflects the
 
Competent
>
 
Person’s view of the deposit.
>
 
The Resource has been classified based on suitable
 
distances from points of
observations prescribed in the common United States
 
classification system.
>
 
The use of the United States standards is appropriate and
 
customary for this resource
jurisdiction and deposition type.3
>
 
MM&A performed a geostatistical analysis test
 
of the Coronado data sets using the
Drill Hole Spacing Analysis (
DHSA
) method.
>
 
Based on MM&A’s analysis, it would be possible to extend the measured,
 
indicated
and inferred arcs slightly beyond historically accepted
 
practices due to consistent
geological settings. The QP’s have elected not to extend
 
arc distances, introducing a
level of conservatism in the coal classification.
>
 
All relevant factors have been accounted for and
 
reflect the Competent Person’s view
of the deposit.
Audits or reviews
>
 
The results of any audits or reviews of Mineral
 
Resource estimates.
>
 
MM&A completed prepared a statement of coal resources
 
and reserves for the
Properties in accordance with the JORC Code
 
as of December 31, 2017.
 
MM&A also
subsequently updated the estimate of resources and
 
reserves for depletion as of
December 31, 2018, December 31, 2019, and
 
December 31, 2020.
>
 
MM&A performed a previous audit of the Properties
 
in year 2017 for Coronado based
on U.S. Securities and Exchange Commission (SEC)
 
Industry Guide 7 and USGS
Circular 891 standards.
 
>
 
Earlier audits were performed by various independent
 
consultants for predecessors-
in-title to Coronado and at various levels of detail
 
depending on the clients concerns
and the allotted time for completion.
 
Previous audits and reviews defined the primary
coal resource areas and estimated the recoverable
 
tonnes for each seam based on
the expected mining methods.
 
>
 
Additionally, MM&A has performed proprietary evaluations for predecessors-in-title
 
to
Coronado, which encompass portions of the Properties
 
included in this TRS.
Discussion of
relative accuracy/
confidence
>
 
Where appropriate a statement of the relative accuracy
 
and confidence level in
the Mineral Resource estimate using an approach
 
or procedure deemed
appropriate by the Competent Person. For example,
 
the application of statistical
or geostatistical procedures to quantify the relative
 
accuracy of the resource
within stated confidence limits, or, if such an approach is not deemed
appropriate, a qualitative discussion of the factors that
 
could affect the relative
accuracy and confidence of the estimate.
>
 
The statement should specify whether it relates
 
to global or local estimates,
and, if local, state the relevant tonnages, which
 
should be relevant to technical
and economic evaluation. Documentation should include
 
assumptions made
and the procedures used.
>
 
These statements of relative accuracy and confidence
 
of the estimate should be
compared with production data, where available.
>
 
The relative accuracy of and confidence in the
 
coal tonnage and quality estimates
provided herein are judged to be in conformance
 
with current industry best-practices.
 
>
 
The representation of average coal quality characteristics
 
should be understood to
represent a reasonably representative sampling
 
that is generally indicative of coal
quality and does not represent a statistically rigorous
 
approach to coal quality
modeling.
>
 
Resource estimation has been completed using standard
 
coal estimation methods
which are deemed appropriate for this deposit.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
12
Section 4 Estimation and Reporting of Ore Reserves
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral Resource
estimate for
conversion to Ore
Reserves
 
>
 
Description of the Mineral Resource estimate used
 
as a basis for the
conversion to an Ore Reserve.
>
 
The coal resource estimate was prepared
 
as part of the report Coronado Global
Resources Inc. Statement of Coal Resources and
 
Reserves in Accordance with
JORC Code and United States SEC Standards
 
as of December 31, 2021 –
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and
Pennsylvania, USA – February 2022 prepared
 
by MM&A.
>
 
The resource estimation criteria were developed
 
by MM&A based on the capabilities
of the mining equipment used within the production
 
model and on industry-accepted
standards to assure that the basic geologic characteristics
 
of the coal resources are
in reasonable conformity with those to be mined and
 
marketed by Coronado.
>
 
Clear statement as to whether the Mineral Resources
 
are reported additional
to, or inclusive of, the Ore Reserves.
>
 
Coal resources generally are reported inclusive of
 
the coal reserves.
 
In some
cases, resources are reported in addition to coal reserves.
 
Tables 1-1 and 11
 
-3 of
the TRS clearly identify resources “inclusive of mine
 
plan” from which coal reserves
were estimated along with those resources “exclusive
 
of mine plan” from which no
reserves were estimated.
 
Site visits
 
>
 
Comment on any site visits undertaken by the
 
Competent Person and the
outcome of those visits.
>
 
MM&A is very familiar with the Properties and
 
has conducted multiple site visits
throughout the years.
Study status
 
>
 
The type and level of study undertaken to
 
enable Mineral Resources to be
converted to Ore Reserves.
>
 
A preliminary feasibility LOM plan was prepared by
 
MM&A for active and proposed
mines.
 
>
 
The Code requires that a study to at least Pre-Feasibility
 
Study level has been
undertaken to convert Mineral Resources to Ore
 
Reserves. Such studies will
have been carried out and will have determined a
 
mine plan that is technically
achievable and economically viable, and that material
 
Modifying Factors have
been considered.
>
 
This geologic evaluation conducted in accordance
 
with JORC and SEC standards
and in conjunction with the preliminary feasibility
 
study is sufficient to conclude that
the surface, highwall miner and underground
 
coal reserves identified on the
Properties are economically mineable under reasonable
 
expectations of market
prices for thermal and metallurgical coal products, estimated
 
operation costs, and
capital expenditures.
>
 
The pre-feasibility financial models, prepared by MM&A
 
for this TRS, was developed
to test the economic viability of each coal resource
 
area.
>
 
Proved and probable coal reserve were derived
 
from the defined in-situ coal
resource considering relevant processing, economic (including
 
independent
estimates of capital, revenue and cost, marketing, legal,
 
environmental,
socioeconomic, and regulatory factors).
Cut-off parameters
>
 
The basis of the adopted cut-off grade(s) or quality parameters
 
applied.
>
 
The cut-off parameters were tailored for each of the
 
Coronado properties to be in
accordance with mining/ processing capabilities and
 
market conditions prevalent at
each operation.
>
 
Examples include minimum recoverable coal thickness,
 
acceptable ash content and
wash recovery, and manageable overburden to coal ratio for surface mineable
 
coal.
>
 
Details of the parameters are cited within the TRS and
 
included in the table of Cut-
off Parameters listed in Section 11.1 of this TRS.
>
 
These cut-off parameters have been developed by MM&A
 
based on its experience
with the Coronado properties and are typical of
 
mining operations in the Central
Appalachian coal basin.
 
This experience includes technical and economic
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
13
Criteria
JORC Code explanation
Commentary
evaluations of numerous properties in the region
 
for the purposes of determining the
economic viability of the subject coal reserves.
Mining factors or
assumptions
 
>
 
The method and assumptions used as reported
 
in the Pre-Feasibility or
Feasibility Study to convert the Mineral Resource to an
 
Ore Reserve (i.e. either
by application of appropriate factors by optimisation
 
or by preliminary or
detailed design).
>
 
After validating coal seam data and establishing
 
correlations, the thickness and
elevation for seams of economic interest were
 
used to generate a geologic model.
>
 
A pre-feasibility LOM plan was prepared
 
by MM&A for active and proposed mines.
 
MM&A prepared mine projections and production timing
 
forecasts based on coal
seam characteristics.
 
Production timing was carried out from 2022
 
to depletion
(exhaustion) of the coal reserve areas.
>
 
The choice, nature and appropriateness of the selected
 
mining method(s) and
other mining parameters including associated design
 
issues such as pre-strip,
access, etc.
>
 
The room-and-pillar mining method was selected to
 
model the underground mining
resources, utilizing continuous miners for coal extraction,
 
shuttle cars for production
section haulage and roof bolters for roof control,
 
with the exception that the
Buchanan Mine also uses longwall shearers, armored
 
face conveyors, and
hydraulic self-advancing roof support.
 
The resource areas located above drainage
are relatively small and often have irregular
 
boundaries.
The Buchanan Mine in
Buchanan County, Virginia is the only active longwall mine currently being operated
by Coronado.
>
 
The Coronado underground mining resource areas
 
which are located above-
drainage require an access road and mine access
 
development along the outcrop,
whereas below-drainage mines are accessed via shaft or
 
slope based on other
proposed surface infrastructure locations and/or
 
surface property control.
 
>
 
The surface mining method selected utilizes highly productive
 
hydraulic shovels,
front-end loaders, large tractors and rock trucks
 
for overburden removal.
 
The
mobile equipment spreads adapt readily to winding
 
coal outcrops for contour
surface mining and are effective for point-removal and area
 
mining applications.
>
 
Application of highwall and auger mining units
 
is an effective method to recover coal
resources not suitable for underground mining and under
 
excessive cover for
surface mining.
>
 
The assumptions made regarding geotechnical parameters (e.g.
 
pit slopes,
stope sizes, etc.), grade control and pre-production
 
drilling.
>
 
Mining plans for potential underground mines were
 
developed by MM&A.
 
Pillar
stability was tested by MM&A using the
Analysis of Coal Pillar Stability (ACPS
)
program that was developed by the
National Institute for Occupational Safety
and Health (
NIOSH
)
.
 
>
 
Coronado must obtain approved mining plans from
United States Department of
Labor Mine Safety and Health Administration (
MSHA
)
that define safety
parameters for the highwalls developed during
 
contour and area mining.
 
MM&A’s
planning model does not require input of specific
 
highwall design parameters, but
provides for timing of mining within mine plan polygons
 
that is representative of the
operation performance attained at Central Appalachia
 
surface mines.
>
 
Highwall and auger mining is conducted under highwalls
 
designed and constructed
to meet MSHA permit requirements.
 
To better assure highwall stability and safety
during highwall coal extraction, MSHA requires that
 
coal fenders, or stumps, be left
in place between successive cuts. Periodic barrier pillars
 
must be left in place as an
additional safeguard.
 
MM&A has adjusted the expected mining recovery
 
for
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
14
Criteria
JORC Code explanation
Commentary
highwall and auger mining resources to reflect
 
highwall stability and safety
requirements.
>
 
The major assumptions made and Mineral Resource
 
model used for pit and
stope optimisation (if appropriate).
>
 
Underground Mining Resources:
 
For metallurgical resources, minimum coal seam
thickness extends down to between 0.6 and 1.2
 
meters and a minimum overburden
(depth of cover) of 30.5 meters.
 
A 61-meter horizontal distance is maintained from
abandoned mines and sealed or pillared areas,
 
and a 30-meter horizontal distance
is maintained from planned highwall miner panels.
 
Mine recovery is reduced when
a rider coal seam is present within a 1.5- to 3.0-meter
 
interval above the coal seam.
 
No mining is projected when the interval between
 
overlying and underlying reserves
is less than 12 meters.
>
 
Surface Mining Resources:
 
For classification as a surface-mineable resource, a
seam must be at least 0.3 meters in thickness
 
as a stand-alone (principle) seam
and 0.15 meters in thickness when less than
 
0.8 meters from a principle seam.
 
The
maximum cumulative area mining strip ratio is generally
 
20:1 for thermal coal and
30:1 for metallurgical coal.
 
Some areas were assessed for their economic viability
at higher ratios, and were included as reserves
 
if deemed economic.
 
For contour
surface mining, a minimum of 38-meter bench is
 
provided to support HWM.
>
 
HWM and Auger Mining Resources: HWM cut depth (penetration)
 
is established at
a maximum of 244 meters.
 
The minimum mineable coal thickness is limited
 
at 0.6
meters. For coal seams less than 0.8 meters
 
thick, roof and/or floor characteristics
must allow OSD cutting to maintain a 0.8-meter
 
minimum cutting height.
Auger
mining cut depth is established at an average
 
of 91 meters.
 
The minimum mineable
coal thickness is limited at 0.5 meters.
>
 
The mining dilution factors used.
>
 
Underground Mining Reserves:
 
The planning model assigns minimum mining
heights of 1.4 to 1.8 meters for mains and panel
 
development.
 
At the Buchanan
Mine, a minimum mining height of 1.8 meters
 
was used due to the longwall mining
method being employed.
 
For coal seams thinner than the assigned mining
 
height,
the difference between the coal seam height and assigned
 
mining height consists of
OSD.
 
In all cases a minimum of 0.05 meters
 
of OSD was assumed, with the
exception of the Mon Valley mines, where a minimum 0.15 meters of OSD was
assumed due to weaker floor strata.
>
 
Surface Mining Reserves:
 
Area mining is generally limited to a cumulative
overburden ratio of 30:1 and a 15:1 ratio for
 
contour mining.
 
Exceptions were
considered for mining of metallurgical grade coal where
 
deemed economical.
 
It is
assumed that careful cleaning of exposed coal pits will
 
result in minimal OSD.
>
 
HWM and Auger Mining Reserves:
 
The mining plan assumes that the HWM cutting
height is a minimum of 76 to 99 centimeters
 
for clearance purposes.
 
When the coal
seam is less than 76 to 99 centimeters thick, OSD
 
assumed and included in the
ROM product.
Because the auger has very limited OSD cutting ability, it is assumed
that an appropriate auger diameter will be
 
chosen based on the coal seam
thickness and that OSD will be minimal.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
15
Criteria
JORC Code explanation
Commentary
>
 
The mining recovery factors used.
>
 
Underground Mining Reserves:
 
Mine recovery generally varies between 40 and
 
60
percent for continuous mining panels, and 100
 
percent for longwall.
>
 
Surface Mining Reserves:
 
Mining recovery is 90 percent for virgin areas.
 
Mining
recovery is reduced where second mining is
 
projected in previously underground
and auger mined areas.
>
 
HWM and Auger Mining Reserves:
 
A mine recovery of 40 percent has been applied
for HWM.
A mine recovery of 35 percent has been
 
applied for auger mining.
>
 
Any minimum mining widths used.
>
 
Underground Mining Reserves:
 
Typical entry width is 5.8 to 6.1 meters.
>
 
The manner in which Inferred Mineral Resources
 
are utilised in mining studies
and the sensitivity of the outcome to their inclusion.
>
 
Proved and probable coal reserve were derived
 
from the defined in-situ coal
resource considering relevant processing, economic (including
 
independent
estimates of capital, revenue and cost, marketing, legal,
 
environmental,
socioeconomic, and regulatory factors).
>
 
Mine plan LOM tonnage includes inferred coal and
 
those areas that do not meet the
minimum coal thickness requirement for classification as
 
reserve.
 
Inferred coal
represents approximately 0.6% of the LOM production
 
for Mon Valley and 0.04% of
the total LOM production for Logan.
 
None of this coal was included in the estimate
of reserves
 
>
 
The infrastructure requirements of the selected mining
 
methods.
>
 
Underground Mining Resources:
 
The continuous mining method provides for the
extraction of coal from the production faces using
 
continuous miners (and longwall
shearing machine at Buchanan) and haulage using
 
shuttle cars or battery haulers to
a feeder-breaker located at the tail of the section
 
conveyor belt.
 
The feeder-breaker
crushes large pieces of coal and rock and regulates
 
coal feed onto the mine
conveyor.
 
A chain conveyor is used to remove coal from
 
the longwall face at the
Buchanan Mine for placement onto the conveyor belt
 
which is ultimately delivered to
an underground storage bunker.
 
Roof-bolting machines are used to install roof
bolts, and battery scoops are available to clean the
 
mine entries and assist in
delivery of mine supplies to work areas.
 
Surface ventilation fans are installed as
needed to provide a sufficient volume of air to ventilate production
 
sections, coal
haulage and transport entries, battery charging stations,
 
and transformers in
accordance with approved plans.
>
 
Coronado currently operates three coal preparation
 
plants, one each at the
Buchanan, Logan County and Greenbrier Divisions.
 
The Buchanan Plant operates
at a feed rate of approximately 907 raw tonnes
 
per hour (
tph
), whereas the
Saunders Plant (Logan County Division) has a nominal
 
feed rate of 816 tph, and the
Mountaineer Plant (Greenbrier Division) operates
 
at 544 tph.
MM&A has included
capital estimates for construction of additional
 
coal preparation plants at the Russell
County and Mon Valley Complex for the purposes of this TRS.
 
>
 
Surface Mining Resources: The surface mining mobile equipment
 
spreads advance
the contour and area mining pits while systematically
 
reclaiming the trailing side of
pits where coal has been removed.
 
The coal haul roads are extended and
maintained as the pits advance.
 
Support facilities are maintained nearby but
 
away
from the active mining, and include storage areas
 
for blasting agents, fuel and
lubricants, and mine supplies along with maintenance
 
facilities and offices.
 
Most of
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
16
Criteria
JORC Code explanation
Commentary
the surface mine production is transported to a loading
 
point for crushing, blending
and direct-shipment to customers.
 
>
 
HWM and Auger Resources: The HWM equipment advances
 
along with the contour
mining pits.
 
The rate of advance of the contour mining
 
is governed by the
advancement rate of the HWM.
 
A diesel-powered generator trails the highwall
miner and powers the continuous mining unit.
 
Other support facilities are provided
along with the contour mining support facilities.
 
HWM production is all transported
by truck to the coal preparation plant for washing.
Metallurgical
factors or
assumptions
 
>
 
The metallurgical process proposed and the appropriateness
 
of that process to
the style of mineralisation.
>
 
Coarse material is washed in a heavy medium
 
vessel.
 
Intermediate-size material is
washed in heavy medium cyclones.
 
Fine material is washed using conventional
froth flotation cells.
>
 
Whether the metallurgical process is well-tested technology
 
or novel in nature.
>
 
Processes are typical of those used in the
 
coal industry and are in use at adjacent
coal processing plants.
>
 
The nature, amount and representativeness of metallurgical
 
test work
undertaken, the nature of the metallurgical domaining applied
 
and the
corresponding metallurgical recovery factors applied.
>
 
The quality characteristics for the subject coal resources and
 
coal reserves have
been reviewed in detail by MM&A.
 
The drill hole data were utilized to develop
average coal quality characteristics mining site.
 
These average coal quality
characteristics were then utilized as the basis for determining
 
the various markets
into which the saleable coal will likely be placed.
>
 
Any assumptions or allowances made for deleterious
 
elements.
>
 
No significant effects on product quality are anticipated
 
from dilution material; float
product quality was used to model final product
 
quality.
>
 
The existence of any bulk sample or pilot scale
 
test work and the degree to
which such samples are considered representative of
 
the orebody as a whole
>
 
No bulk sample or pilot scale work has been completed.
>
 
For minerals that are defined by a specification,
 
has the ore reserve estimation
been based on the appropriate mineralogy to meet
 
specifications?
>
 
Notwithstanding the complexity of the coal quality data
 
set, the seams of the central
and northern Appalachian coalfields have a long history
 
of providing both high-Btu
thermal coals and high-, mid- and low-volatile coking
 
coals with favorable
metallurgical properties.
Environmental
 
>
 
The status of studies of potential environmental impacts
 
of the mining and
processing operation. Details of waste rock characterisation
 
and the
consideration of potential sites, status of design options
 
considered and, where
applicable, the status of approvals for process residue
 
storage and waste
dumps should be reported.
>
 
MM&A completed a Limited Phase I Environmental Site
 
Assessment (
ESA
) on the
Buchanan property
 
in April 2016, and on the Logan County
 
and Greenbrier
Properties in May 2017 on behalf of Coronado.
>
 
MM&A identified one REC at Greenbrier associated
 
with stained soil and gravel
near a fueling and maintenance area.
 
Coronado reported to MM&A that satisfactory
clean-up efforts were completed at Greenbrier.
>
 
Based on these former ESAs completed by MM&A,
 
it is MM&A’s opinion that
Coronado has a generally typical coal industry
 
record of compliance with applicable
mining, water quality, and environmental laws.
 
Estimated costs for mine closure,
including water quality monitoring during site reclamation,
 
are included in the TRS
financial models.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
17
Criteria
JORC Code explanation
Commentary
Infrastructure
 
>
 
The
 
existence
 
of
 
appropriate
 
infrastructure:
 
availability
 
of
 
land
 
for
 
plant
development, power,
 
water,
 
transportation (particularly
 
for bulk
 
commodities),
labour,
 
accommodation;
 
or
 
the
 
ease
 
with
 
which
 
the
 
infrastructure
 
can
 
be
provided or accessed.
>
 
Coronado currently operates one surface mine (Toney Fork Mine at the Logan Mine
Complex); Coronado also controls the idle Midland
 
Surface Mine at the Greenbrier
Mine Complex.
 
>
 
Coronado operates five underground mines as follows:
 
Buchanan Mine at the
Buchanan Mine Complex; Powellton #1, Eagle No. 1,
 
Muddy Bridge and Lower War
Eagle Mines in the Logan Mine Complex; the Mountaineer
 
#1 Mine at the
Greenbrier Mine Complex is currently idle.
>
 
All ROM production is currently planned for either
 
truck transportation from the
mines to the processing or shipping facilities, or
 
in some cases there is either a
current or planned mine mouth preparation plant and
 
barge/rail loading facility.
 
>
 
There is a network of public highways that provide
 
serviceable coal haul routes and
private, internal roads on the Properties would
 
be developed as may be needed.
 
Rail service to the Properties is most readily
 
provided by NS and CSX
with
connections to both domestic consumers and international
 
trans-shipment points.
 
NS track is located across the Monongahela
 
River from the proposed Pangburn
Hollow load-out facility.
 
Coal would be shipped to customers via barge
 
and rail and
sold as both metallurgical and thermal products.
 
Costs
 
>
 
The derivation of, or assumptions made, regarding
 
projected capital costs in
the study.
>
 
The methodology used to estimate operating costs.
>
 
Coronado provided historical and 5-year budget operating
 
costs for its active mines
for MM&A’s review.
 
MM&A used the historical and/or budget cost
 
information as a
reference and developed personnel schedules for
 
each mine.
 
Hourly labor rates
and salaries were based upon information contained
 
in Coronado’s financial
summaries.
 
Fringe benefit costs were developed for vacation
 
and holidays, federal
and state unemployment insurance, retirement, workers’
 
compensation and
pneumoconiosis, casualty and life insurance, healthcare
 
and bonuses.
 
A cost factor
for mine supplies was developed that relates expenditures
 
to mine advance rates for
roof control costs and other mine supply costs at
 
underground mines.
 
Other factors
were developed for maintenance and repair costs,
 
rentals, mine power, outside
services and other direct mining costs
>
 
Surface mine direct operating costs were developed
 
as a function of overburden
ratio for repair and maintenance supplies, diesel
 
fuel, explosives and blasting, and
miscellaneous supplies and services.
 
Operating costs for highwall mines are based
on costs per ROM tonne estimates.
 
Other cost factors were developed for
 
coal
preparation plant processing, refuse handling,
 
coal loading, trucking, property taxes,
and insurance and bonding.
 
Appropriate royalty rates were assigned for production
from leased coal lands and sales taxes were calculated
 
for state severance taxes,
the federal black lung excise tax, and federal and
 
state reclamation fees.
>
 
Capital schedules were developed by MM&A for mine
 
development, infrastructure,
and on-going capital requirements for the life of
 
each projected mine.
>
 
Staffing levels were prepared and operating costs estimated
 
by MM&A for each
projected mine.
 
MM&A utilized historical cost data provided by Coronado
 
and its
own knowledge and experience to estimate direct
 
and indirect operating costs.
 
>
 
Allowances made for the content of deleterious elements.
>
 
No allowances have been made for deleterious
 
elements; no impact to quality from
deleterious elements is anticipated.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
18
Criteria
JORC Code explanation
Commentary
>
 
The derivation of assumptions made of metal or commodity
 
price(s), for the
principal minerals and co- products.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
>
 
Derivation of transportation charges.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
>
 
The basis for forecasting or source of treatment and
 
refining charges, penalties
for failure to meet specification, etc.
>
 
MM&A utilized historical cost data provided by
 
Coronado and its own knowledge
and experience to estimate direct and indirect operating
 
costs.
 
All ROM production
is currently planned for either truck transportation from
 
the mines to the processing
or shipping facilities, or in some cases there is either
 
a current or planned mine
mouth preparation plant and barge/rail loading facility.
>
 
The allowances made for royalties payable, both
 
Government and private.
>
 
Appropriate royalty rates were assigned for production
 
from leased coal lands and
sales taxes were calculated for state severance taxes,
 
the federal black lung excise
tax, and federal and state reclamation fees.
Revenue factors
 
>
 
The derivation of, or assumptions made regarding
 
revenue factors including
head grade, metal or commodity price(s) exchange
 
rates, transportation and
treatment charges, penalties, net smelter returns, etc.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
>
 
The derivation of assumptions made of metal or commodity
 
price(s), for the
principal metals, minerals and co-products.
>
 
Coal sales prices as defined above.
 
All reported reserves are on a marketable
basis.
Market assessment
 
>
 
The demand, supply and stock situation for the particular
 
commodity,
consumption trends and factors likely to affect supply and
 
demand into the
future.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
 
 
ex964p47i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
19
Criteria
JORC Code explanation
Commentary
>
 
A customer and competitor analysis along with the identification
 
of likely market
windows for the product.
>
 
All of the mine production serves metallurgical and thermal
 
markets.
 
The
metallurgical coal is marketed as high-volatile (typically
 
28 percent or greater volatile
matter content); mid-volatile (typically 23- to 27-percent
 
volatile matter content) and
low-volatile (typically less than 23 percent volatile
 
matter content) products.
>
 
Raw ROM production that requires washing is
 
currently processed through
Coronado owned and operated coal preparation
 
plants.
 
>
 
ROM coal that does not require further processing
 
is delivered directly to the loading
points for sizing and delivery to customers.
 
Coronado has access to two rail-loading
points serviced by the
Norfolk Southern Corporation (
NS
)
 
and two rail-loading
points serviced by
CSX Corporation (
CSX
)
.
>
 
Price and volume forecasts and the basis for these
 
forecasts.
>
 
Carlson Mining 2020
®
 
was used by MM&A to generate mine
 
plans for underground-
and surface-mineable coal seams.
 
Underground mine plans were sequenced
based on productivity schedules provided by Coronado,
 
which were based on
historically achieved productivity levels.
 
Surface mine plans were generated under
productivity assumptions (bank cubic yard per shift) as
 
provided by Coronado and
reviewed by MM&A, again based heavily on productivity
 
levels achieved by
Coronado.
 
All production forecasting ties assumed production
 
rates to geological
models as constructed independently by MM&A’s team of geologists and mining
engineers.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
Economic
 
>
 
The inputs to the economic analysis to produce the
 
net present value (NPV) in
the study, the source and confidence of these economic inputs including
estimated inflation, discount rate, etc.
>
 
On an unlevered basis, the NPV of the project
 
cash flows after taxes was estimated
for the purpose of classifying coal reserves.
 
The project cash flows, excluding debt
service, are calculated by subtracting direct and indirect
 
operating expenses and
capital expenditures from revenue.
 
Direct costs include labor, drilling and blasting,
operating supplies, maintenance and repairs, facilities
 
costs for materials handling,
coal preparation, refuse disposal, coal loading, sampling
 
and analysis services,
reclamation and general and administrative costs.
 
Indirect costs include statutory
and legally agreed upon fees related to direct
 
extraction of the mineral.
 
The indirect
costs are the Federal black lung tax, Federal
 
and State reclamation taxes, property
taxes, local transportation prior to delivery at
 
rail or barge loading sites, coal
production royalties, sales and use taxes, income
 
taxes and State severance taxes.
Coronado’s historical costs provided a useful reference
 
for MM&A’s cost estimates.
>
 
Coronado provided MM&A with price forecasts
 
for all Properties.
 
Customer coal
pricing is derived from market observed forward
 
estimates based on global
economic supply and demand analysis which is applied
 
to mine plan sales volumes
and product mix and is supplemented with Coronado’s
 
in-house knowledge of
applicable rail transportation charges, ocean freight
 
charges and port charges.
 
Coal
price forecasts for the various products were provided
 
by Coronado for various coal
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
20
Criteria
JORC Code explanation
Commentary
markets in terms of US nominal dollars per metric
 
tonne.
 
MM&A utilized this data
for price forecasting in financial modeling.
>
 
All costs and prices are based on 2021 nominal United
 
States dollars.
>
 
A pre-feasibility LOM plan was prepared
 
by MM&A for active and proposed mines.
 
MM&A prepared mine projections and production timing
 
forecasts based on coal
seam characteristics.
 
Production timing was carried out from 2022
 
to depletion
(exhaustion) of the coal reserve areas, which is projected
 
for the year 2099.
>
 
The all-mines average cash cost ranges between approximately
 
$56 and $311 per
tonne for most of the operating period.
>
 
NPV ranges and sensitivity to variations in the
 
significant assumptions and
inputs.
>
 
An estimate of NPV at a base discount rate of
 
10.0% was included in Section 19 of
the TRS.
>
 
NPV of the Buchanan, Russell, Mon Valley, Logan and Greenbrier Properties was
estimated to be $1.580 billion, $89.7 million, $287.3
 
million, $611.3 million and
$66.0 million, respectively.
>
 
The sensitivity study shows the NPV at the 10.0%
 
discount rate when Base Case
sales prices, operating costs, and capital costs are
 
increased and decreased in
increments of 5% within a +/- 15% range.
 
Social
 
>
 
The status of agreements with key stakeholders
 
and matters leading to social
license to operate.
>
 
Portions of the properties are located near
 
local communities.
 
Regulations prohibit
mining activities within 91 meters of a residential
 
dwelling, school, church, or similar
structure unless written consent is first obtained from
 
the owner of the structure.
 
Where required, such consents have been obtained
 
where mining is proposed
beyond the regulatory limits.
Other
 
To the extent relevant, the impact of the following on the project and/or on the
estimation and classification of the Ore Reserves:
>
 
Any identified material naturally occurring risks.
>
 
No material naturally occurring risks have been
 
identified.
>
 
The status of material legal agreements and
 
marketing arrangements.
>
 
The Coronado coal resources are located in Buchanan,
 
Russell and Tazewell
Counties, Virginia; Greenbrier, Logan, Boone, Wyoming and Greenbrier Counties,
West Virginia; Allegheny, Washington and Westmoreland Counties, Pennsylvania.
>
 
MM&A has not carried out separate title verification for
 
the coal properties and has
not verified leases, deeds, surveys or other property
 
control instruments pertinent to
the subject resources.
>
 
Coronado has represented to MM&A that it controls
 
the mining rights to the reserves
as shown on its property maps, and MM&A
 
has accepted these as being a true and
accurate depiction of the mineral rights controlled
 
by Coronado.
 
The TRS assumes
the properties are developed under responsible and
 
experienced management.
>
 
The status of government agreements and approvals
 
critical to the viability of
the project, such as mineral tenement status and
 
government and statutory
approvals. There must be reasonable grounds
 
to expect that all necessary
Government approvals will be received within
 
the timeframes anticipated in the
>
 
Coronado has obtained all mining and discharge permits
 
to operate 34 underground
mines, 13 surface mines, and 18 processing, loadout
 
or related facilities.
 
MM&A is
unaware of any obvious or current Coronado
 
permitting issues that are expected to
prevent the issuance of future permits.
 
Coronado, along with all Central and
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
21
Criteria
JORC Code explanation
Commentary
Pre-Feasibility or Feasibility study. Highlight and discuss the materiality of any
unresolved matter that is dependent on a third part
 
on which extraction of the
reserve is contingent.
Northern Appalachian basin coal producers, is
 
subject to a level of uncertainty
regarding future clean water permits due to
United States Environmental
Protection Agency
(
EPA
)
 
involvement with state programs.
Classification
 
>
 
The basis for the classification of the Ore Reserves
 
into varying confidence
categories. Whether the result appropriately reflects
 
the Competent Person’s
view of the deposit. The proportion of Probable
 
Ore Reserves that have been
derived from Measured Mineral Resources (if any).
>
 
Measured and indicated resources have been
 
converted to proved and probable
reserves, respectively.
>
 
None of the probable coal reserves have been
 
derived from measured resources.
>
 
In a limited number of cases where there was
 
only very limited data available to
demonstrate the metallurgical suitability of a given
 
coal deposit, that deposit was
classified as a probable reserve instead of a
 
proved reserve.
>
 
The results of this TRS define an estimated total
 
initial ROM recoverable ore (coal)
reserve estimate of 556 million tonnes for Coronado
 
as follows:
a)
 
Buchanan =
 
160 Mt
b)
 
Logan
 
=
 
137 Mt
c)
 
Greenbrier=
 
12 Mt
d)
 
Russell =
 
50 Mt
e)
 
Mon Valley =
 
197 Mt
 
>
 
Coronado controls a total of 342 Mt (moist basis)
 
of marketable coal reserves for
Coronado as of December 31, 2021.
 
Of that total, 72 percent are proved, and
 
28
percent are probable.
 
Total reserves by complex are as follows:
a)
 
Buchanan =
 
98 Mt
b)
 
Logan
 
=
 
73 Mt
c)
 
Greenbrier=
 
7 Mt
d)
 
Russell =
 
30 Mt
e)
 
Mon Valley =
 
134 Mt
 
Audits or reviews
>
 
The results of any audits or reviews of Ore
 
Reserve estimates.
>
 
MM&A completed prepared a statement of coal resources
 
and reserves for the
Properties in accordance with the JORC Code
 
as of December 31, 2017.
 
MM&A
also subsequently updated the estimate of resources and
 
reserves for depletion as
of December 31, 2018, December 31, 2019, and
 
December 31, 2020.
>
 
MM&A performed a previous audit of the Properties
 
in year 2017 for Coronado
based on
U.S. Securities and Exchange Commission (
SEC
)
 
Industry Guide 7
standards.
 
Earlier audits were performed by various
 
independent consultants for
predecessors-in-title to Coronado and at various
 
levels of detail depending on the
clients concerns and the allotted time for completion.
 
Previous audits and reviews
defined the primary coal resource areas and estimated
 
the recoverable tonnes for
each seam based on the expected mining methods.
>
 
Additionally, MM&A has performed proprietary evaluations for predecessors-in-title
to Coronado, which encompass portions of the Properties
 
included in this TRS.
Discussion of
relative accuracy/
confidence
 
>
 
Where appropriate a statement of the relative accuracy
 
and confidence level in
the Ore Reserve estimate using an approach
 
or procedure deemed appropriate
by the Competent Person. For example, the application
 
of statistical or
geostatistical procedures to quantify the relative accuracy
 
of the reserve within
stated confidence limits, or, if such an approach is not deemed
 
appropriate, a
>
 
Operations on the Properties by Coronado and
 
its predecessors have been on-
going for many years.
 
>
 
MM&A is confident that the mine plans and
 
financial models are reasonably
representative to provide an accurate estimation of
 
coal reserves.
>
 
Mine development and operation have not been optimized
 
within the TRS.
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
22
Criteria
JORC Code explanation
Commentary
qualitative discussion of the factors which could affect the relative
 
accuracy
and confidence of the estimate.
>
 
The statement should specify whether it relates
 
to global or local estimates,
and, if local, state the relevant tonnages, which
 
should be relevant to technical
and economic evaluation. Documentation should include
 
assumptions made
and the procedures used.
>
 
Proved and probable coal reserve were derived
 
from the defined in-situ coal
resource considering relevant processing, economic (including
 
independent
estimates of capital, revenue and cost), marketing, legal,
 
environmental,
socioeconomic, and regulatory factors on a global
 
scale as current local data
reflects the global assumptions.
>
 
Accuracy and confidence discussions should extend
 
to specific discussions of
any applied Modifying Factors that may have
 
a material impact on Ore Reserve
viability, or for which there are remaining areas of uncertainty at the current
study stage.
The major risk factors for the active Coronado
 
mines and future resource development
are summarized below:
>
 
Mine Accidents
>
 
Highwall Failure.
 
Highwall failures are likely to result in
 
a temporary mine closure
and should not have a material impact on the
 
mine sustainability.
 
The risk is
considered to be probable.
 
>
 
Adverse Geological Conditions.
 
Adverse geological conditions include such
conditions as faults and sandstone washes.
 
The risk is considered to be probable.
 
The impact is expected to be temporary with
 
little material impact on mine
sustainability.
>
 
Environmental Risk.
 
Numerous federal and state permits are required
 
to operate
coal mines and mine surface facilities. Permitting rules
 
are complex and may
change over time, making compliance difficult or impossible.
>
 
Water Quality.
 
Permit requirements to fulfill Clean Water Act obligations are
 
subject
to modification.
 
The probability of water quality changes having
 
a material impact
on mine operations is possible.
 
As a contemporary example, the selenium
discharge issue that affects western Canadian and Central
 
Appalachian Basin
operators has only recently emerged as a concern
 
and its ultimate impact has not
been determined.
>
 
New Permits.
 
Permit protests by environmental groups and
 
individuals can
contribute to permit delays or denial and increase
 
the cost of permitting and delay
development.
 
Surface mining activities, coal refuse disposal and
 
construction of
access roads in mountainous terrain often require
 
storage of material in valley fills.
 
Authority to dispose of fill material into waters of
 
the United States must be granted
by the
United States Army Corps of Engineers
 
(
COE
)
.
 
COE permits are
increasingly difficult to obtain.
>
 
Regulatory Requirements.
 
Adverse impact from regulatory changes is
 
considered
to be probable.
 
The impact will likely affect the broader industry
 
and is not expected
to result in mine closure.
>
 
Market Risk.
 
Metallurgical and thermal coal markets ultimately depend
 
upon the
global steel and thermal coal demand and are
 
considered to be volatile.
 
Currently,
the US coal market has seen a decline
 
in demand for thermal coal due to thermal
plant closures, as a result of new air and
 
water pollution regulations, and
competition from other commodities used for power
 
generation such as natural gas.
 
This has resulted in an overall decline in CAPP
 
coal production.
 
Continued
 
 
ex964p2i0.jpg
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code
 
as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
23
Criteria
JORC Code explanation
Commentary
regulatory changes and declining demand could result
 
in material changes in
domestic and global coal markets.
 
The impact cannot be predicted at this time;
however, while MM&A expects the coal reserve within this TRS to
 
remain
economically viable throughout the life of the projected
 
mines, the LOM financial
model is very sensitive to changes in coal sales
 
price and therefore market risk is
not insignificant.
>
 
Labor Risk.
 
Work stoppage due to organized labor protests
 
is considered to be
unlikely and not likely to lead to permanent mine
 
closure.
 
The mines are likely to
suffer the loss of key supervisors and skilled employees
 
due to retirement as the
workforce ages.
 
The problem is industry-wide and the impact
 
is expected to be
temporary and have no sustained impact on coal production.
>
 
Availability of Equipment and Supplies.
 
Risk of equipment and supply availability is
likely to be temporary and should not have a sustained
 
adverse impact on the
production of coal.
>
 
Transportation Delay.
 
Interruption of coal transport services by river
 
or rail is
considered to be probable but unlikely to have a
 
sustained impact on coal
production.
>
 
It is recognised that this may not be possible or appropriate
 
in all
circumstances. These statements of relative accuracy and
 
confidence of the
estimate should be compared with production data,
 
where available.
>
 
Mine plans, productivity expectations and cost estimates
 
generally reflect historical
performance and efforts have been made to adjust plans
 
and costs to reflect future
conditions.
 
ex1010p1i0.jpg
 
 
 
Curragh Queensland Mining Pty Ltd
ABN 55 095 450 418
Private Mail Bag
Blackwater QLD 4717
T +61 7 4986 9211 | F +61 7 4986 9327
www.coronadoglobal.com
 
16 February 2022
PRIVATE
 
AND CONFIDENTIAL
Douglas Thompson,
 
c/o: dthompson@coronadoglobal.com
Dear Douglas,
I wish
 
to confirm
 
the following
 
remuneration
 
elements
 
not included
 
within your
 
Contract of
 
Employment
 
which
has
 
been
 
in
 
effect
 
since
 
September
 
1,
 
2021,
 
when
 
you
 
commenced
 
in
 
the
 
role
 
of
 
Chief
 
Operating
 
Officer,
Australia with Curragh Queensland Mining Pty Ltd (CQMPL)
(“the Company”)
.
 
In
 
addition
 
to
 
the
 
remuneration
 
specified
 
within
 
the
 
Contract
 
of
 
Employment,
 
you
 
received
 
a
 
sign-on
 
bonus
totalling $300,000 gross which was paid
 
to you in cash in
 
September 2021. Since your commencement, we have
agreed specific improvement
 
targets relating to
 
Curragh’s performance
 
and, should those
 
targets be met
 
within
the timeframe agreed,
 
you will receive
 
an additional bonus
 
payment of $500,000
 
gross. This bonus
 
is over and
above any other incentive program.
 
Although not forming part
 
of your Contract of
 
Employment, I can confirm
 
that you will be invited
 
to participate in
both the
 
short-term and
 
long-term incentive
 
programs. The
 
STI opportunity
 
will be
 
100% of
 
your TEC,
 
and the
LTI will also equal
 
100% of your TEC.
Should you have any queries concerning this
 
letter, please do
 
not hesitate to contact Emma Pollard
 
on 07 3031
7626.
Yours sincerely
/s/ Garold Spindler
Garold Spindler
Chief Executive Officer
I have read,
 
understand, agree to
 
and accept the
 
terms and conditions
 
as outlined in
 
this Letter.
 
I confirm that
the
 
payment
 
amounts
 
which
 
I
 
receive
 
under
 
the
 
Contract
 
of
 
Employment,
 
satisfies
 
any
 
obligations
 
on
 
the
Company to pay
 
to me
 
any entitlements
 
to which
 
I may
 
otherwise be
 
entitled under
 
an industrial
 
instrument or
law.
 
Signed:
 
/s/ Douglas Thompson
 
Date: 18/02/2022
Douglas Thompson
 
 
 
 
 
 
 
 
 
- 1 -
EMPLOYMENT AGREEMENT
THIS EMPLOYMENT AGREEMENT (“Agreement”), made as of July 12, 2021,
effective on September 1, 2021, between CORONADO GLOBAL RESOURCES INC. (the
“Company”), a Delaware corporation and Christopher P.
 
Meyering (“Employee”), presently
residing in or near ***.
WITNESSETH:
WHEREAS, the Company wishes to offer employment to the Employee and to
protect against Employee’s competing against the Company,
 
and Employee desires to be
employed by the Company and to provide assurances of confidentiality as set forth in this
Agreement,
 
NOW,
 
THEREFORE, intending to be legally bound hereby, the Company hereby
agrees to employ Employee, and Employee hereby agrees to be employed by the Company,
upon the following terms and conditions:
1.
Duties and Responsibilities.
Employee shall hold the position of Vice President, Chief Legal Officer & Secretary
and shall render such services and perform such duties commensurate with his position as
may be reasonably assigned to him from time to time by the Company.
 
Excluding any
periods of vacation and sick leave to which Employee is entitled, Employee agrees to devote
reasonable attention and time during normal business hours to the business and affairs of the
Company and, to the extent necessary to discharge the responsibilities assigned to Employee
hereunder, to use Employee’s
 
reasonable best efforts to perform faithfully and efficiently
such responsibilities.
2.
Compensation.
(a)
Employee’s base salary effective as of the effective
 
date set forth above shall
be US$500,000 per year, which shall be reviewed from time to time and may be increased
by the Company in the best interests of the Company and in accordance with Employee’s
then current responsibilities, paid in accordance with the Company’s regular payroll
practices and on regularly scheduled payroll dates.
 
In addition, Employee shall be entitled
to participate in all short-term incentive, long term incentive, welfare, savings and retirement
and other employee benefit plans, practices, policies, and programs applicable generally to
other executive officers of the Company.
(b)
The Company shall reimburse the Employee for all reasonable business
expenses paid by the Employee in the performance of his duties or as otherwise may be
approved by the Company.
 
Expenses shall be reimbursed within a reasonable period of time
(not to exceed four (4) weeks) following the submission of appropriate proof of any such
expenditures.
3.
Term; Termina
 
tion of Employment.
(a)
Subject to the terms and provisions of this Agreement, Employee’s
employment hereunder shall commence as of September 1, 2021 and shall continue until
December 31, 2022 (the “Expiration Date”).
 
Notwithstanding the forgoing to the contrary,
each year the Expiration Date shall be automatically extended to December 31 of the
following year unless either party gives written notice to the other party, on or before
September 30 of the year in which the Expiration Date is scheduled to occur, of its intention
not to extend the Expiration Date.
 
(b)
The employment of Employee hereunder may be terminated by the Company
with or without Cause (as defined below) or by Employee with or without Good Reason (as
 
 
 
 
- 2 -
defined below).
 
Employee’s employment shall terminate automatically if Employee dies.
 
If
the Company determines in good faith that the Disability (as defined below) of Employee
has occurred, it may give to Employee written notice of its intention to terminate
Employee’s employment.
 
In such event, Employee’s employment with the Company shall
terminate effective on the 30th day after receipt of such notice by Employee, provided that,
within the thirty (30) days after such receipt, Employee shall not have returned to full-time
performance of Employee’s duties. Nothing in this section shall be construed to waive the
Employee's rights, if any, under existing law including, without limitation, the Americans
with Disabilities Act.
(c)
“Cause” shall mean by reason of Employee’s: (i) conviction of, or plea of
nolo
contendere
to, any felony or to any crime or offense causing substantial harm to the
Company or its affiliates or involving acts of theft, fraud, embezzlement, moral turpitude, or
similar conduct, (ii) repeated intoxication by alcohol or drugs during the performance of
such Employee’s duties in a manner that materially and adversely affects the Employee's
performance of such duties, (iii) malfeasance, in the conduct of such Employee's duties, that
consists of (1)
willful and intentional misuse or diversion of funds of the Company or its
affiliates, (2) embezzlement, or (3) fraudulent or willful and material misrepresentations or
concealments on any written reports submitted to the Company or its Affiliates, or (iv)
material failure to perform the duties of Employee’s employment or material failure to
follow or comply with the reasonable and lawful written directives of the board of directors
or the board of managers or other governing body a subsidiary or affiliate of the Company
by which such Employee is employed, in either case after the Employee shall have been
informed, in writing, of such material failure and given a period of not more than thirty (30)
days to fully remedy same.
 
(d)
“Disability” shall mean Employee's incapacity due to physical or mental
illness that (i) shall have prevented Employee from performing his duties for the Company
or any of its subsidiaries or affiliates on a full-time basis for more than one hundred eighty
(180) days or (ii) (1) the board of directors determines, in good faith, is likely to prevent
Employee from performing such duties for such a 180-day period and (2) thirty (30) days
has elapsed since delivery to Employee of the determination of the board and Employee has
not resumed such performance of duties.
 
(e)
“Good Reason” shall mean, without Employee’s express written consent, the
occurrence of any one or more of the following: (i) a material diminution of Employee’s
authorities, duties, responsibilities, and status (including offices, titles, and reporting
requirements) as an employee of the Company or any successor thereof (any such
diminution occurring as a result of the Company’s ceasing to be a publicly traded entity (or
its merger into, or acquisition of the business of the Company or of a substantial portion of
its assets by, another publicly traded entity) shall be deemed material for purposes of the
foregoing); (ii) the Company’s requiring Employee to be based at a location in excess of
thirty-five miles from the location of Employee’s principal job location or office
immediately prior to such change; (iii) a reduction in Employee’s base salary or any material
reduction by the Company of Employee’s other compensation or benefits; (iv) the failure of
the Company to obtain a satisfactory agreement from any successor to the Company to
assume and agree to perform the Company’s obligations under this Agreement; (v) any
purported termination by the Company of Employee’s employment that (1) is not effected
pursuant to a notice of termination indicating the specific termination provision in this
Agreement relied upon, and (2) shall set forth in reasonable detail the facts and
circumstances claimed to provide a reasonable good faith basis for termination of
Employee’s employment; and (vi) a material breach of this Agreement by the Company.
Employee must deliver the Company written notice of his resignation for Good Reason no
later than thirty (30) days after the occurrence of any such event in order for Employee’s
resignation with Good Reason to be effective hereunder, such resignation will not be
effective until the 30th day following receipt of such written notice by the Company (the
 
 
 
 
 
 
 
 
 
 
 
 
- 3 -
 
“cure period”) and such resignation shall not be deemed to be for “Good Reason” hereunder
unless the circumstance giving rise to Employee’s “Good Reason” remains uncured at the
end of the cure period.
4.
Compensation Upon Termination of Employment.
(a)
Termination by the Company for Cause or Resignation by Employee Without
Good Reason.
 
If Employee’s employment is terminated by the Company for Cause or by
Employee without Good Reason, the Company shall provide the following (referred to in
this Agreement as the “Accrued Obligations”) to the Employee (i) Employee’s base salary,
vacation, unpaid business expenses and other cash entitlements accrued through the date of
termination shall be paid to Employee in a lump sum of cash on the first regularly scheduled
payroll date that is at least ten (10) days from the date of termination to the extent
theretofore
 
unpaid, (ii) the amount of any compensation previously deferred by Employee
shall be paid to Employee in accordance with the terms of the applicable deferred
compensation plan to the extent theretofore unpaid and (iii) amounts that are vested benefits
or that Employee is otherwise entitled to receive under any plan, policy, practice or program
of or any other contract or agreement with the Company at or subsequent to the date of
termination, payable in accordance with such plan, policy, practice or program or contract or
agreement, and the Company shall have no other severance obligations with respect to
Employee under this Agreement.
 
(b)
Termination by the Company Without
 
Cause or Resignation by the Employee
for Good Reason.
 
If Employee’s employment is terminated by the Company without Cause
or if Employee resigns for Good Reason, the Company shall provide the following to
Employee (i) the Accrued Obligations, payable as provided in Section 4(a) hereof, (ii) a
period of twelve (12) months (“Severance Period”) base salary based upon the salary
Employee earned at the time of his termination, and (iii) an amount equal to the cost to
Employee for the continuation of any health and medical benefits during the Severance
Period.
 
Any payments due hereunder shall be conditioned upon Employee having provided,
within sixty (60) days of his termination of employment, an irrevocable waiver and general
release of claims in favor of the Company (and its respective affiliates, subsidiaries,
successors, officers, directors, and employees) in a form reasonably satisfactory to the
Company.
(c)
Death or Disability.
 
If Employee’s employment is terminated by reason of
Employee’s death or Disability,
 
the Company shall provide the Accrued Obligations to
Employee, or in the event of Employee’s death, to his estate or beneficiaries, and the
Company shall have no other severance obligations with respect to Employee under this
Agreement.
 
5.
Confidential Information, etc.
(a)
Employee recognizes and acknowledges that: (i) in the course of Employee’s
employment by the Company it will be necessary for Employee to acquire information
which could include, in whole or in part, information concerning the Company’s sales, sales
volume, sales methods, sales proposals, customers and prospective customers, identity of
customers and prospective customers, identity of key purchasing personnel in the employ of
customers and prospective customers, amount or kind of customers’ purchases from the
Company, the Company’s
 
sources of supply, computer programs, system documentation,
special hardware, product hardware, related software development, manuals, formulae,
processes, methods, machines, compositions, ideas, improvements, inventions or other
confidential or proprietary information belonging to the Company or relating to the
Company’s affairs (collectively referred to herein as the “Confidential Information”); (ii) the
Confidential Information is the property of the Company; (iii) the use, misappropriation or
disclosure of the Confidential Information would constitute a breach of trust and could cause
irreparable injury to the Company; and (iv) it is essential to the protection of the Company’s
good will and to the
 
 
 
 
- 4 -
maintenance of the Company’s competitive position that the Confidential Information be
kept secret and that Employee not disclose the Confidential Information to others or use the
Confidential Information to Employee’s own advantage or the advantage of others.
 
For
purposes of this Agreement, Confidential Information shall not include information known
by Employee before his employment with the Company or information that becomes
publicly available through some means other than disclosure by Employee in violation of
this Agreement.
 
(b)
Employee further recognizes and acknowledges that it is essential for the
proper protection of the business of the Company that Employee be restrained (i) from
soliciting or inducing any employee of the Company or of any subsidiary of the Company
(for purposes of
 
Sections 5, 6 and 7 herein the “Company” shall mean to include any
subsidiaries or affiliates thereof) to leave the employ of the Company,
 
(ii) from hiring or
attempting to hire any Employee of the Company, (iii) from soliciting the trade of or trading
with the customers of the Company for any business purpose, and (iv) from competing
against the Company each according to the terms of Section 6 following.
6.
Confidentiality, Non-compete and Related Covenants.
(a)
Employee agrees to hold and safeguard the Confidential Information in trust
for the Company, its successors and assigns and agrees that he shall not, without the prior
written consent of the Company, disclose or make available to anyone for use outside the
Company at any time, either during his employment by the Company or subsequent to the
termination or resignation of his employment by the Company, for any reason, any of the
Confidential Information, whether or not developed by Employee, except as required in the
performance of Employee’s duties to the Company.
 
For the avoidance of doubt, this
provision shall not prohibit Employee from reporting possible violations of federal law or
regulation to any governmental agency or entity or from making other disclosures that are
protected under the whistleblower provisions of federal law or regulation.
 
The Company’s
approval shall not be required, nor shall notice to the Company be required, in connection
with such reports or disclosures.
(b)
Upon the termination of Employee’s employment by the Company or
resignation by the Employee, for any reason, Employee shall promptly deliver to the
Company all originals and copies of correspondence, drawings, blueprints, financial and
business records, marketing and publicity materials, manuals, letters, notes, notebooks,
laptops, reports, flow-charts, programs, proposals and any documents concerning the
Company’s customers or concerning products or processes used by the Company and,
without limiting the foregoing, shall promptly deliver to the Company any and all other
documents or materials containing or constituting Confidential Information.
(c)
Subject to the provisions of Section 6(f) following, Employee agrees that
during his employment by the Company he shall not, directly or indirectly, solicit the trade
of, or trade with, any customer or prospective customer of the Company for any business
purpose other than for the benefit of the Company.
 
Upon termination of Employee’s
employment by the Company, including without limitation
 
termination by the Company in a
termination for Cause or otherwise, or upon the resignation of the Employee, except in the
case of Good Reason, Employee further agrees that for a period of one (1) year after the
cessation of employment hereunder, Employee shall not, directly or indirectly,
 
solicit the
trade of, or trade with, any customers, or prospective customers, of the Company, or solicit
or induce, or attempt to solicit or induce, any employee of the Company to leave the
Company for any reason whatsoever or hire any employee of the Company.
 
 
 
 
 
 
- 5 -
(d)
Subject to the provisions of Section 6(f) following, during the period of
Employee’s employment hereunder and upon termination of Employee’s
 
employment by the
Company, including without limitation termination by the Company in a termination for
Cause or otherwise, or upon the resignation of the Employee except in the case of Good
Reason, Employee agrees that for a period of one (1) year after the cessation of employment
hereunder, Employee shall not, in any Competitive Territory,
 
engage, directly or indirectly,
whether as principal or as agent, officer, director,
 
employee, consultant, shareholder or
otherwise, alone or in association with any other person, corporation or other entity, in any
Competing Business.
 
For purposes of this Agreement, (i) the term “Competing Business”
shall mean the production or sales of metallurgical bituminous coal, and (ii) the term
“Competitive Territory” shall mean the United States of America, Australia and any other
nation in which, to the knowledge of Employee, the Company has made or considered
making such sales, either itself or through a subsidiary, affiliate or joint venture partner,
during the last two years prior to the termination of Employee’s employment hereunder.
(e)
Prior to accepting employment during the one-year non-compete period
referred to in Section 6(d), Employee shall notify the Company of such employment
opportunity in reasonable detail in order for the Company to determine if the position
Employee is seeking violates this Agreement.
(f)
Notwithstanding the provisions of Sections 6(c) or 6(d) to the contrary, the
Company, it is sole and absolute discretion, may,
 
by written notice delivered to Employee
promptly after the termination of Employee’s employment by the Company or the
resignation of Employee, elect to waive and not enforce the non-solicitation and non-
compete provisions of Sections 6(c) and 6(d).
 
(g)
Unless the Company has provided notice that it has waived and will not
enforce both the non-solicitation and non-compete provisions of Sections 6(c) and 6(d) as
provided in Section 6(f), during the one-year period beginning on the first business day
following the last day of Employee’s employment with the Company,
 
the Company shall
pay the Employee, in twelve equal monthly payments during such year commencing thirty
(30) days after the last day of Employee’s employment with the Company,
 
an amount equal
to one half (1/2) of the annual salary of Employee as of the business day immediately
preceding the last day of Employee’s employment with the Company.
 
Payments under this
section shall be in addition to any severance or other payments due to Employee under the
terms of this Agreement.
 
During such one-year period (unless the waiver contemplated by
Section 6(f) has been made), and in consideration of the payments contemplated by this
Section 6(g), Employee agrees to consult with the Company as requested by the Company
provided such consultation: shall not require more than twenty (20) hours of consultation per
week; shall not unreasonably interfere with any subsequent employment (if any) secured by
Employee during such one-year period, and shall be reasonably related to the duties of
Employee while employed.
 
At Employee’s discretion, Employee shall provide such
consultation by phone, e-mail or other remote communication or at the location of
Employee’s principal job location or office immediately prior to the termination of his
employment and shall not be required to otherwise travel.
7.
Injunctive and other relief.
(a)
Employee represents that his experience and capabilities are such that Sections
5 and 6 hereof not prevent him from earning his livelihood and acknowledges that it would
cause the Company serious and irreparable injury and cost if Employee were to use his
ability and knowledge in competition with the Company or to otherwise breach the
obligations contained in said paragraphs.
 
 
 
 
 
- 6 -
(b)
In the event of a breach by Employee of the terms of this Agreement, the
Company shall be entitled, if it shall so elect, to institute legal proceedings to enforce the
specific performance of this Agreement by Employee and to enjoin Employee from any
further violation of this Agreement and to exercise such remedies cumulatively or in
conjunction with all other rights and remedies provided by law.
 
Employee acknowledges,
however, that the remedies at law for any breach by him of the provisions of this Agreement
may be inadequate and that the Company shall be entitled to injunctive relief against him in
the event of any breach.
(c)
It is the intention of the parties that the provisions of Sections 5 and 6 hereof
shall be enforceable to the fullest extent permissible under applicable law, but that the
unenforceability (or modification to conform to such law) of any provision or provisions
hereof shall not render unenforceable, or impair, the remainder thereof.
 
If any provision or
provisions hereof shall be deemed invalid or unenforceable, either in whole or in part, this
Agreement shall be deemed amended to delete or modify, as necessary,
 
the offending
provision or provisions and to alter the bounds thereof in order to render it valid and
enforceable.
8.
Governing Law.
This Agreement shall be governed by and construed in accordance with the laws of
the State of Connecticut without giving effect to any choice or conflict of law provision or
rule (whether of the State of Connecticut or any other jurisdiction) that would cause the
application of the laws of any jurisdiction other than the State of Connecticut.
9.
Amendments, waivers, etc.
No amendment of any provision of this Agreement, and no postponement or waiver of
any such provision or of any default, misrepresentation, or breach of warranty or covenant
hereunder, whether intentional or not, shall be valid unless such amendment, postponement
or waiver is in writing and signed by or on behalf of the Company and Employee.
 
No such
amendment, postponement or waiver shall be deemed to extend to any prior or subsequent
matter, whether or not similar to the subject matter of such amendment, postponement or
waiver.
 
No failure or delay on the part of the Company or Employee in exercising any right,
power or privilege under this Agreement shall operate as a waiver thereof nor shall any single
or partial exercise of any right, power or privilege hereunder preclude any other or further
exercise thereof or the exercise of any other right, power or privilege.
10.
Assignment.
The rights and duties of the Company under this Agreement may be transferred to,
and shall be binding upon, any person or company which acquires or is a successor to the
Company, its business or a significant portion of the assets of the Company by merger,
purchase or otherwise, and the Company shall require any such acquirer or successor by
agreement in form and substance reasonably satisfactory to Employee, expressly to assume
and agree to perform this Agreement in the same manner and to the same extent that the
Company, as the case may be, would be required to perform if no such acquisition or
succession had taken place.
 
Regardless of whether such agreement is executed, this
Agreement shall be binding upon any acquirer or successor in accordance with the operation
of law and such acquirer or successor shall be deemed the “Company”, as the case may be,
for purposes of this Agreement.
 
The Employee may not transfer any of his respective rights
and duties hereunder except with the written consent of the Company.
 
 
 
 
 
- 7 -
11.
Interpretation, etc.
The Company and Employee have participated jointly in the negotiation and drafting
of this Agreement.
 
If an ambiguity or question of intent or interpretation arises, this
Agreement shall be construed as if drafted jointly by the Company and Employee and no
presumption or burden of proof shall arise favoring or disfavoring the Company or Employee
because of the authorship of any of the provisions of this Agreement.
 
The word “including”
shall mean including without limitation.
 
The rights and remedies expressly specified in this
Agreement are cumulative and are not exclusive of any rights or remedies which either party
would otherwise have.
 
The Section headings hereof are for convenience only and shall not
affect the meaning or interpretation of this Agreement.
 
For purposes of this Agreement, the
term “termination” when used in the context of a condition to, or timing of, payment
hereunder shall be interpreted to mean a “separation from service” as that term is used in
Section 409A of the Code.
 
12.
Integration; counterparts.
This Agreement constitutes the entire agreement among the parties and supersedes
any prior understandings, agreements or representations by or among the parties, written or
oral, to the extent they relate to the subject matter hereof.
 
This Agreement may be executed
in one or more counterparts, each of which shall be deemed an original but all of which
together shall constitute one and the same instrument.
 
It shall not be necessary in making
proof of this Agreement to produce or account for more than one such counterpart.
13.
Code Section 409A.
 
This Agreement is intended to comply with Section 409A of the Internal Revenue
Code of 1986, as amended (the “Code”), and its corresponding regulations, or an exemption,
and payments may only be made under this Agreement upon an event and in a manner
permitted by Section 409A, to the extent applicable. Any payments that qualify for the
"short-term deferral" exception or another exception under Section 409A shall be paid under
the applicable exception. Notwithstanding anything in this Agreement to the contrary, if
required by Section 409A, if the Employee is considered a "specified employee" for purposes
of Section 409A and if payment of any amounts under this Agreement is required to be
delayed for a period of six months after separation from service pursuant to Section 409A
(after taking into account all applicable exemptions), payment of such amounts shall be
delayed as required by Section 409A, and the accumulated amounts shall be paid in a lump
sum payment within ten (10) days after the end of the six-month period.
 
If the Employee dies
during the postponement period prior to the payment of benefits, the amounts withheld on
account of Section 409A shall be paid to the personal representative of the Employee's estate
within sixty (60) days after the date of the Employee's death.
 
All payments to be made upon
a termination of employment under this Agreement may only be made upon a "separation
from service" under Section 409A.
 
For purposes of Section 409A of the Code, the right to a
series of installment payments under this Agreement shall be treated as a right to a series of
separate payments.
 
In no event may the Employee, directly or indirectly, designate the
calendar year of a payment. All reimbursements and in-kind benefits provided under the
Agreement shall be made or provided in accordance with the requirements of Section 409A,
including, where applicable, the requirement that (i) any reimbursement is for expenses
incurred during the period of time specified in this Agreement or if no such period is
specified, during the Employee's lifetime, (ii) the amount of expenses eligible for
reimbursement, or in kind benefits provided, during a calendar year may not affect the
expenses eligible for reimbursement, or in kind benefits to be provided, in any other calendar
year, (iii) the reimbursement of an eligible expense will be made no later than the last day of
the calendar year following the year in which the expense is incurred, and (iv) the right to
reimbursement or in kind benefits is not subject to liquidation or exchange for another
benefit. Notwithstanding any provision contained herein, in no event shall the Company be
obligated to reimburse the
 
 
 
 
 
- 8 -
Employee for any additional tax (or related penalties and interest) Employee may incur by
reason of application of Section 409A.
 
“Termination of employment,” “resignation” or
words of similar import, as used in this Agreement shall mean, with respect to any payments
subject to Section 409A, the Employee’s “separation from service” as defined by Section
409A.
14.
Notices.
Any notice, consent, waiver and other communications required or permitted pursuant
to the provisions of this Agreement must be in writing and shall be deemed to have been
properly given (a) when delivered by hand; (b) when sent by email (with acknowledgment of
complete transmission), provided that a copy is also mailed by U.S. certified mail, return
receipt requested; (c) five (5) days after sent by certified mail, return receipt requested; or (d)
three (3) days after deposit with a nationally recognized overnight delivery service, in each
case to the appropriate addresses and email addresses set forth below:
If to Employee:
Christopher P.
 
Meyering
***
Email: ***
If to the Company:
Coronado Global Resources
Lvl 33 CP1, 345 Queen Street
Brisbane, 4000, Australia
Attn: Garold Spindler
Email: ***
15.
Vacation
 
.
 
The Employee shall initially be entitled to not less than four (4) week’s annual paid
vacation, prorated for partial years. Vacation
 
time not used by the end of the year shall be
forfeited.
 
16.
Indemnity.
 
Employer will, to the maximum extent permitted by Employer’s bylaws and
applicable law, indemnify and hold Employee harmless for any acts or decisions made in
good faith while performing services for Employer; provided, however, acts determined by a
court of competent jurisdiction to be acts of gross negligence or willful misconduct will not
be deemed to be in good faith.
Signature Page Follows
 
 
 
 
 
- 9 -
IN WITNESS WHEREOF, the due
 
execution hereof as of the date first above written.
CORONADO GLOBAL RESOURCES
INC.
 
/s/ Emma Pollard
 
By: /s/ Garold R. Spindler
 
Witness:
 
Garold R. Spindler
 
Chief Executive Officer
 
 
/s/ Cecilia Santos
 
By: /s/ Christopher P.
 
Meyering
 
Witness:
 
Christopher P.
 
Meyering