c561202210K
FALSE 2022 --12-31 167645373 1 1000000000 100000000 0.01 167645373 1 0.01 0001770561 FY 167645373 1 83-1780608 No No Yes Yes ☒ 0001770561 2022-01-01 2022-12-31 0001770561 srt:MinimumMember 2022-01-01 2022-12-31 0001770561 srt:MaximumMember 2022-01-01 2022-12-31 0001770561 2021-01-01 2021-12-31 0001770561 2021-12-31 0001770561 us-gaap:ConstructionInProgressMember 2021-12-31 0001770561 2022-12-31 0001770561 c561:CoalLeasesContractLiabilityMember 2021-12-31 0001770561 c561:MiningPermitsMember c561:LoganSegmentMember 2021-12-31 0001770561 c561:StanwellReservedAreaDeferredConsiderationMember 2021-12-31 0001770561 c561:MiningPermitsMember c561:BuchananSegmentMember 2021-12-31 0001770561 c561:PlantMachineryMiningEquipmentAndTransportationVehiclesMember 2021-12-31 0001770561 us-gaap:LandMember 2021-12-31 0001770561 us-gaap:MiningPropertiesAndMineralRightsMember 2021-12-31 0001770561 c561:StanwellBelowMarketCoalSupplyAgreementMember 2021-12-31 0001770561 c561:StanwellReservedAreaDeferredConsiderationMember 2018-08-14 0001770561 us-gaap:MineDevelopmentMember 2021-12-31 0001770561 us-gaap:CorporateNonSegmentMember 2021-12-31 0001770561 us-gaap:AssetRetirementObligationCostsMember 2021-12-31 0001770561 us-gaap:BuildingAndBuildingImprovementsMember 2021-12-31 0001770561 c561:BuchananMember 2016-03-31 0001770561 us-gaap:OfficeEquipmentMember 2021-12-31 0001770561 c561:BuchananMember 2021-12-31 0001770561 us-gaap:AccumulatedTranslationAdjustmentMember 2021-12-31 0001770561 us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember 2021-12-31 0001770561 c561:MiningPermitsMember c561:LoganSegmentMember 2022-01-01 2022-12-31 0001770561 c561:MiningPermitsMember c561:BuchananSegmentMember 2022-01-01 2022-12-31 0001770561 c561:MiningPermitsMember c561:LoganSegmentMember 2021-01-01 2021-12-31 0001770561 c561:MiningPermitsMember c561:BuchananSegmentMember 2021-01-01 2021-12-31 0001770561 2020-01-01 2020-12-31 0001770561 us-gaap:OperatingSegmentsMember 2021-01-01 2021-12-31 0001770561 us-gaap:OperatingSegmentsMember 2022-01-01 2022-12-31 0001770561 c561:CoalRevenueMember 2021-01-01 2021-12-31 0001770561 c561:CoalRevenueMember 2020-01-01 2020-12-31 0001770561 c561:CoalRevenueFromRelatedPartiesMember 2021-01-01 2021-12-31 0001770561 c561:CoalRevenueFromRelatedPartiesMember 2020-01-01 2020-12-31 0001770561 2019-12-31 0001770561 us-gaap:AccumulatedTranslationAdjustmentMember 2021-01-01 2021-12-31 0001770561 us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember 2021-01-01 2021-12-31 0001770561 us-gaap:AccumulatedTranslationAdjustmentMember 2020-12-31 0001770561 us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember 2020-12-31 0001770561 2020-12-31 0001770561 c561:CoronadoGroupLlcMember 2018-10-23 0001770561 c561:CoronadoGroupLlcMember 2016-06-30 0001770561 c561:NonMarketCoalSupplyAgreementMember 2021-12-31 0001770561 c561:NonMarketCoalSupplyAgreementMember 2021-01-01 2021-12-31 0001770561 c561:NonMarketCoalSupplyAgreementMember 2022-01-01 2022-12-31 0001770561 us-gaap:WorkersCompensationInsuranceMember 2021-05-01 0001770561 us-gaap:WorkersCompensationInsuranceMember 2020-05-01 0001770561 us-gaap:WorkersCompensationInsuranceMember 2021-01-01 2021-12-31 0001770561 us-gaap:WorkersCompensationInsuranceMember 2020-01-01 2020-12-31 0001770561 us-gaap:WorkersCompensationInsuranceMember 2021-12-31 0001770561 srt:MinimumMember us-gaap:UnsecuredDebtMember 2022-01-01 2022-12-31 0001770561 us-gaap:UnsecuredDebtMember srt:MaximumMember 2022-01-01 2022-12-31 0001770561 c561:DefinedContributionPlan401KMember 2022-01-01 2022-12-31 0001770561 srt:MaximumMember c561:DefinedContributionPlan401KMember 2022-01-01 2022-12-31 0001770561 srt:MaximumMember c561:BuchananPlanMember 2022-01-01 2022-12-31 0001770561 srt:MaximumMember c561:BuchananPlanMember 2021-01-01 2021-12-31 0001770561 srt:MaximumMember c561:BuchananPlanMember 2020-01-01 2020-12-31 0001770561 c561:EquityIncentivePlan2018Member 2021-01-01 2021-12-31 0001770561 c561:EquityIncentivePlan2018Member 2020-01-01 2020-12-31 0001770561 us-gaap:PerformanceSharesMember 2021-01-01 2021-12-31 0001770561 us-gaap:PerformanceSharesMember 2021-12-31 0001770561 us-gaap:RestrictedStockUnitsRSUMember 2021-12-31 0001770561 srt:MinimumMember c561:MachineryMiningEquipmentAndTransportationVehiclesMember 2022-01-01 2022-12-31 0001770561 srt:MaximumMember c561:MachineryMiningEquipmentAndTransportationVehiclesMember 2022-01-01 2022-12-31 0001770561 srt:MinimumMember us-gaap:OfficeEquipmentMember 2022-01-01 2022-12-31 0001770561 srt:MaximumMember us-gaap:OfficeEquipmentMember 2022-01-01 2022-12-31 0001770561 srt:MaximumMember us-gaap:LandAndBuildingMember 2022-01-01 2022-12-31 0001770561 srt:MinimumMember us-gaap:LandAndBuildingMember 2022-01-01 2022-12-31 0001770561 c561:ChessDepositaryInterestsMember 2022-01-01 2022-12-31 0001770561 us-gaap:OperatingSegmentsMember 2020-01-01 2020-12-31 0001770561 us-gaap:WorkersCompensationInsuranceMember 2022-01-01 2022-12-31 0001770561 2022-06-30 0001770561 c561:ChessDepositaryInterestsMember 2018-10-23 0001770561 c561:EmgGroupMember 2022-01-01 2022-12-31 0001770561 c561:UsDollarCoalSalesInAustraliaMember 2022-01-01 2022-12-31 0001770561 c561:UsDollarCoalSalesInAustraliaMember 2021-01-01 2021-12-31 0001770561 c561:UsDollarCoalSalesInAustraliaMember 2020-01-01 2020-12-31 0001770561 2019-10-23 2019-12-31 0001770561 c561:CoalRevenueFromRelatedPartiesMember 2022-01-01 2022-12-31 0001770561 c561:CoalRevenueMember 2022-01-01 2022-12-31 0001770561 c561:MetallurgicalCoalMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2022-01-01 2022-12-31 0001770561 c561:MetallurgicalCoalMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2022-01-01 2022-12-31 0001770561 c561:ThermalCoalMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2022-01-01 2022-12-31 0001770561 c561:ThermalCoalMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2022-01-01 2022-12-31 0001770561 c561:TotalCoalRevenueMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2022-01-01 2022-12-31 0001770561 c561:TotalCoalRevenueMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2022-01-01 2022-12-31 0001770561 c561:MetallurgicalCoalMember 2022-01-01 2022-12-31 0001770561 c561:ThermalCoalMember 2022-01-01 2022-12-31 0001770561 c561:TotalCoalRevenueMember 2022-01-01 2022-12-31 0001770561 c561:MetallurgicalCoalMember 2021-01-01 2021-12-31 0001770561 c561:ThermalCoalMember 2021-01-01 2021-12-31 0001770561 c561:TotalCoalRevenueMember 2021-01-01 2021-12-31 0001770561 c561:MetallurgicalCoalMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2021-01-01 2021-12-31 0001770561 c561:MetallurgicalCoalMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2021-01-01 2021-12-31 0001770561 c561:ThermalCoalMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2021-01-01 2021-12-31 0001770561 c561:ThermalCoalMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2021-01-01 2021-12-31 0001770561 c561:TotalCoalRevenueMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2021-01-01 2021-12-31 0001770561 c561:TotalCoalRevenueMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2021-01-01 2021-12-31 0001770561 c561:MetallurgicalCoalMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2020-01-01 2020-12-31 0001770561 c561:MetallurgicalCoalMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2020-01-01 2020-12-31 0001770561 c561:ThermalCoalMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2020-01-01 2020-12-31 0001770561 c561:ThermalCoalMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2020-01-01 2020-12-31 0001770561 c561:TotalCoalRevenueMember us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2020-01-01 2020-12-31 0001770561 c561:TotalCoalRevenueMember us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2020-01-01 2020-12-31 0001770561 c561:MetallurgicalCoalMember 2020-01-01 2020-12-31 0001770561 c561:ThermalCoalMember 2020-01-01 2020-12-31 0001770561 c561:TotalCoalRevenueMember 2020-01-01 2020-12-31 0001770561 us-gaap:RestrictedStockUnitsRSUMember 2022-01-01 2022-12-31 0001770561 us-gaap:PerformanceSharesMember 2022-01-01 2022-12-31 0001770561 us-gaap:PerformanceSharesMember 2019-12-31 0001770561 us-gaap:PerformanceSharesMember 2020-01-01 2020-12-31 0001770561 c561:EquityIncentivePlan2018Member 2022-01-01 2022-12-31 0001770561 c561:EquityIncentivePlan2018Member c561:ChessDepositaryInterestsMember 2022-01-01 2022-12-31 0001770561 c561:AwardedIn2018Member us-gaap:EmployeeStockOptionMember 2022-01-01 2022-12-31 0001770561 us-gaap:PerformanceSharesMember c561:AwardedIn2020Member 2022-01-01 2022-12-31 0001770561 c561:AwardedIn2018Member us-gaap:PerformanceSharesMember 2022-01-01 2022-12-31 0001770561 us-gaap:SecuredDebtMember 2021-12-31 0001770561 us-gaap:UnsecuredDebtMember 2021-12-31 0001770561 us-gaap:StandbyLettersOfCreditMember 2021-12-31 0001770561 c561:CashCollateralMember 2021-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2022-01-01 2022-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2022-01-01 2022-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2021-01-01 2021-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2021-01-01 2021-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2020-01-01 2020-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2020-01-01 2020-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2021-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2021-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2020-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2020-12-31 0001770561 us-gaap:CorporateNonSegmentMember 2022-01-01 2022-12-31 0001770561 us-gaap:CorporateNonSegmentMember 2021-01-01 2021-12-31 0001770561 us-gaap:CorporateNonSegmentMember 2020-01-01 2020-12-31 0001770561 us-gaap:CorporateNonSegmentMember 2020-12-31 0001770561 us-gaap:WorkersCompensationInsuranceMember srt:ScenarioForecastMember 2023-05-01 0001770561 us-gaap:DisposalGroupHeldForSaleOrDisposedOfBySaleNotDiscontinuedOperationsMember 2022-12-31 0001770561 us-gaap:DisposalGroupHeldForSaleOrDisposedOfBySaleNotDiscontinuedOperationsMember 2021-12-31 0001770561 us-gaap:AccumulatedTranslationAdjustmentMember 2022-01-01 2022-12-31 0001770561 us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember 2022-01-01 2022-12-31 0001770561 c561:AblFacilityMember 2022-12-31 0001770561 us-gaap:FairValueInputsLevel2Member 2022-12-31 0001770561 c561:ChessDepositaryInterestsMember 2022-12-31 0001770561 us-gaap:AccountsReceivableMember 2020-12-31 0001770561 us-gaap:OtherAssetsMember 2020-12-31 0001770561 us-gaap:AccountsReceivableMember 2021-12-31 0001770561 us-gaap:OtherAssetsMember 2021-12-31 0001770561 c561:TradeAndRelatedPartyTradeReceivablesNetProvisionExpensesMember 2022-01-01 2022-12-31 0001770561 c561:OtherAssetsRelatedNetProvisionExpenseMember 2022-01-01 2022-12-31 0001770561 us-gaap:AccountsReceivableMember 2022-12-31 0001770561 us-gaap:OtherAssetsMember 2022-12-31 0001770561 c561:PlantMachineryMiningEquipmentAndTransportationVehiclesMember 2022-12-31 0001770561 us-gaap:MineDevelopmentMember 2022-12-31 0001770561 us-gaap:BuildingAndBuildingImprovementsMember 2022-12-31 0001770561 us-gaap:OfficeEquipmentMember 2022-12-31 0001770561 us-gaap:ConstructionInProgressMember 2022-12-31 0001770561 us-gaap:LandMember 2022-12-31 0001770561 us-gaap:MiningPropertiesAndMineralRightsMember 2022-12-31 0001770561 us-gaap:AssetRetirementObligationCostsMember 2022-12-31 0001770561 c561:MiningPermitsMember c561:LoganSegmentMember 2022-12-31 0001770561 c561:MiningPermitsMember c561:BuchananSegmentMember 2022-12-31 0001770561 c561:BuchananMember 2022-12-31 0001770561 c561:SeniorSecuredNotesMember 2022-12-31 0001770561 c561:SeniorSecuredNotesMember 2021-12-31 0001770561 c561:AblFacilityMember 2022-12-31 0001770561 c561:AblFacilityMember 2021-12-31 0001770561 c561:SeniorSecuredNotesMember 2022-01-01 2022-12-31 0001770561 c561:AblFacilityMember 2022-01-01 2022-12-31 0001770561 c561:SeniorSecuredNotesMember 2021-05-12 0001770561 c561:SeniorSecuredNotesMember 2022-11-23 2022-11-23 0001770561 c561:AblFacilityMember 2021-05-12 0001770561 c561:AblFacilityMember us-gaap:LetterOfCreditMember 2022-12-31 0001770561 c561:ThirdPartyFinancerMember 2022-01-01 2022-12-31 0001770561 srt:MaximumMember c561:ThirdPartyFinancerMember 2022-01-01 2022-12-31 0001770561 srt:MaximumMember c561:ThirdPartyFinancerMember 2022-12-31 0001770561 c561:ThirdPartyFinancerMember 2021-12-31 0001770561 us-gaap:OtherCurrentLiabilitiesMember 2021-12-31 0001770561 us-gaap:OtherNoncurrentLiabilitiesMember 2021-12-31 0001770561 c561:SafetyMember c561:ScorecardAwardsMember c561:AwardedIn2020And2021Member 2022-01-01 2022-12-31 0001770561 c561:ScorecardAwardsMember c561:AwardedIn2020And2021Member c561:TotalShareholderReturnMember 2022-01-01 2022-12-31 0001770561 c561:ScorecardAwardsMember c561:AwardedIn2020And2021Member c561:CashflowMember 2022-01-01 2022-12-31 0001770561 c561:AwardedIn2020And2021Member c561:TotalShareholderReturnMember c561:RelativeTotalShareholderReturnMember 2022-01-01 2022-12-31 0001770561 c561:AwardedIn2018Member c561:TotalShareholderReturnMember c561:RelativeTotalShareholderReturnMember 2022-01-01 2022-12-31 0001770561 c561:AwardedIn2018Member c561:SafetyMember c561:ScorecardAwardsMember 2022-01-01 2022-12-31 0001770561 c561:AwardedIn2018Member c561:ScorecardAwardsMember c561:ProductionMember 2022-01-01 2022-12-31 0001770561 c561:AwardedIn2018Member c561:ScorecardAwardsMember c561:ProductionCostsMember 2022-01-01 2022-12-31 0001770561 us-gaap:PerformanceSharesMember 2020-12-31 0001770561 us-gaap:PerformanceSharesMember 2022-12-31 0001770561 c561:AwardedIn2021Member us-gaap:PerformanceSharesMember 2022-01-01 2022-12-31 0001770561 us-gaap:CorporateNonSegmentMember 2022-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:AustraliaSegmentMember 2022-12-31 0001770561 us-gaap:OperatingSegmentsMember c561:UnitedStatesSegmentMember 2022-12-31 0001770561 c561:StanwellBelowMarketCoalSupplyAgreementMember 2022-12-31 0001770561 c561:CoalLeasesContractLiabilityMember 2022-12-31 0001770561 us-gaap:UnsecuredDebtMember srt:MaximumMember 2022-12-31 0001770561 c561:StanwellReservedAreaDeferredConsiderationMember 2022-12-31 0001770561 us-gaap:WorkersCompensationInsuranceMember 2022-12-31 0001770561 us-gaap:AccumulatedTranslationAdjustmentMember 2022-12-31 0001770561 us-gaap:AccumulatedGainLossNetCashFlowHedgeParentMember 2022-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember c561:CustomerAMember us-gaap:CustomerConcentrationRiskMember 2022-01-01 2022-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember c561:CustomerAMember us-gaap:CustomerConcentrationRiskMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember c561:CustomerAMember us-gaap:CustomerConcentrationRiskMember 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember us-gaap:CustomerConcentrationRiskMember c561:CustomerBMember 2022-01-01 2022-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember us-gaap:CustomerConcentrationRiskMember c561:CustomerBMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember us-gaap:CustomerConcentrationRiskMember c561:CustomerBMember 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember srt:NorthAmericaMember us-gaap:GeographicConcentrationRiskMember 2022-01-01 2022-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember srt:NorthAmericaMember us-gaap:GeographicConcentrationRiskMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember srt:NorthAmericaMember us-gaap:GeographicConcentrationRiskMember 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember country:AU 2022-01-01 2022-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember country:AU 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember country:AU 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember srt:AsiaMember 2022-01-01 2022-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember srt:AsiaMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember srt:AsiaMember 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember srt:EuropeMember 2022-01-01 2022-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember srt:EuropeMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember srt:EuropeMember 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember srt:SouthAmericaMember 2022-01-01 2022-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember srt:SouthAmericaMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember 2022-01-01 2022-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember 2020-01-01 2020-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember c561:BrokeredSalesMember 2022-01-01 2022-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember c561:BrokeredSalesMember 2021-01-01 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember c561:BrokeredSalesMember 2020-01-01 2020-12-31 0001770561 c561:EmgGroupMember 2021-05-12 0001770561 c561:EmgGroupMember 2022-12-31 0001770561 c561:CoronadoGroupLlcMember us-gaap:UnionizedEmployeesConcentrationRiskMember c561:LaborMember 2022-01-01 2022-12-31 0001770561 c561:FinanceleaseMember 2022-12-31 0001770561 c561:FinanceleaseMember 2021-12-31 0001770561 us-gaap:CommonStockMember 2019-12-31 0001770561 us-gaap:PreferredStockMember 2019-12-31 0001770561 us-gaap:CommonStockMember 2020-12-31 0001770561 us-gaap:PreferredStockMember 2020-12-31 0001770561 us-gaap:CommonStockMember 2021-12-31 0001770561 us-gaap:PreferredStockMember 2021-12-31 0001770561 us-gaap:CommonStockMember 2022-12-31 0001770561 us-gaap:PreferredStockMember 2022-12-31 0001770561 us-gaap:AdditionalPaidInCapitalMember 2019-12-31 0001770561 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2019-12-31 0001770561 us-gaap:RetainedEarningsMember 2019-12-31 0001770561 us-gaap:NoncontrollingInterestMember 2019-12-31 0001770561 us-gaap:CommonStockMember 2020-01-01 2020-12-31 0001770561 us-gaap:PreferredStockMember 2020-01-01 2020-12-31 0001770561 us-gaap:AdditionalPaidInCapitalMember 2020-01-01 2020-12-31 0001770561 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2020-01-01 2020-12-31 0001770561 us-gaap:RetainedEarningsMember 2020-01-01 2020-12-31 0001770561 us-gaap:NoncontrollingInterestMember 2020-01-01 2020-12-31 0001770561 us-gaap:AdditionalPaidInCapitalMember 2020-12-31 0001770561 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2020-12-31 0001770561 us-gaap:RetainedEarningsMember 2020-12-31 0001770561 us-gaap:NoncontrollingInterestMember 2020-12-31 0001770561 us-gaap:CommonStockMember 2021-01-01 2021-12-31 0001770561 us-gaap:PreferredStockMember 2021-01-01 2021-12-31 0001770561 us-gaap:AdditionalPaidInCapitalMember 2021-01-01 2021-12-31 0001770561 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2021-01-01 2021-12-31 0001770561 us-gaap:RetainedEarningsMember 2021-01-01 2021-12-31 0001770561 us-gaap:NoncontrollingInterestMember 2021-01-01 2021-12-31 0001770561 us-gaap:AdditionalPaidInCapitalMember 2021-12-31 0001770561 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2021-12-31 0001770561 us-gaap:RetainedEarningsMember 2021-12-31 0001770561 us-gaap:NoncontrollingInterestMember 2021-12-31 0001770561 us-gaap:CommonStockMember 2022-01-01 2022-12-31 0001770561 us-gaap:PreferredStockMember 2022-01-01 2022-12-31 0001770561 us-gaap:AdditionalPaidInCapitalMember 2022-01-01 2022-12-31 0001770561 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2022-01-01 2022-12-31 0001770561 us-gaap:RetainedEarningsMember 2022-01-01 2022-12-31 0001770561 us-gaap:NoncontrollingInterestMember 2022-01-01 2022-12-31 0001770561 us-gaap:AdditionalPaidInCapitalMember 2022-12-31 0001770561 us-gaap:AccumulatedOtherComprehensiveIncomeMember 2022-12-31 0001770561 us-gaap:RetainedEarningsMember 2022-12-31 0001770561 us-gaap:NoncontrollingInterestMember 2022-12-31 0001770561 c561:FiveCustomersMember 2022-01-01 2022-12-31 0001770561 us-gaap:CustomerConcentrationRiskMember c561:FiveCustomersMember us-gaap:SalesRevenueNetMember 2022-01-01 2022-12-31 0001770561 c561:FiveCustomersMember 2021-01-01 2021-12-31 0001770561 us-gaap:CustomerConcentrationRiskMember c561:FiveCustomersMember us-gaap:SalesRevenueNetMember 2021-01-01 2021-12-31 0001770561 c561:FiveCustomersMember 2020-01-01 2020-12-31 0001770561 us-gaap:CustomerConcentrationRiskMember c561:FiveCustomersMember us-gaap:SalesRevenueNetMember 2020-01-01 2020-12-31 0001770561 c561:FourCustomersMember 2022-12-31 0001770561 c561:FourCustomersMember 2021-12-31 0001770561 us-gaap:CustomerConcentrationRiskMember c561:FourCustomersMember us-gaap:AccountsReceivableMember 2022-01-01 2022-12-31 0001770561 us-gaap:CustomerConcentrationRiskMember c561:FourCustomersMember us-gaap:AccountsReceivableMember 2021-01-01 2021-12-31 0001770561 us-gaap:CustomerConcentrationRiskMember us-gaap:SalesRevenueNetMember c561:CustomerBalancesIndividuallyRepresented10OrMoreMember 2022-01-01 2022-12-31 0001770561 us-gaap:CustomerConcentrationRiskMember us-gaap:AccountsReceivableMember c561:CustomerBalancesIndividuallyRepresented10OrMoreMember 2022-01-01 2022-12-31 0001770561 us-gaap:CustomerConcentrationRiskMember us-gaap:SalesRevenueNetMember c561:CustomerBalancesIndividuallyRepresented10OrMoreMember 2021-01-01 2021-12-31 0001770561 us-gaap:CustomerConcentrationRiskMember us-gaap:SalesRevenueNetMember c561:CustomerBalancesIndividuallyRepresented10OrMoreMember 2020-01-01 2020-12-31 0001770561 us-gaap:DisposalGroupHeldForSaleOrDisposedOfBySaleNotDiscontinuedOperationsMember c561:AmonateSegmentMember 2021-01-01 2021-12-31 0001770561 c561:ChessDepositaryInterestsMember c561:CoronadoGroupLlcMember 2022-12-31 0001770561 us-gaap:CommonStockMember c561:CoronadoGroupLlcMember 2022-12-31 0001770561 c561:CoronadoGroupLlcMember 2022-01-01 2022-12-31 0001770561 c561:ChessDepositaryInterestsMember c561:CoronadoGroupLlcMember c561:NewInvestorsMember 2022-12-31 0001770561 us-gaap:CommonStockMember c561:CoronadoGroupLlcMember c561:NewInvestorsMember 2022-12-31 0001770561 us-gaap:SeriesAPreferredStockMember 2022-12-31 0001770561 c561:ChessDepositaryInterestsMember 2020-01-01 2020-12-31 0001770561 c561:ChessDepositaryInterestsMember 2022-04-08 2022-04-08 0001770561 c561:ChessDepositaryInterestsMember 2022-06-21 2022-06-21 0001770561 c561:ChessDepositaryInterestsMember 2022-09-20 2022-09-20 0001770561 c561:ChessDepositaryInterestsMember 2022-12-12 2022-12-12 0001770561 c561:ChessDepositaryInterestsMember 2022-04-08 0001770561 c561:ChessDepositaryInterestsMember 2022-06-21 0001770561 c561:ChessDepositaryInterestsMember 2022-09-20 0001770561 c561:ChessDepositaryInterestsMember 2022-12-12 0001770561 us-gaap:CommonStockMember 2022-04-08 0001770561 us-gaap:CommonStockMember 2022-06-21 0001770561 us-gaap:CommonStockMember 2022-09-20 0001770561 us-gaap:CommonStockMember 2022-12-12 0001770561 c561:TradeAndRelatedPartyTradeReceivablesNetProvisionExpensesMember 2021-01-01 2021-12-31 0001770561 c561:OtherAssetsRelatedNetProvisionExpenseMember 2021-01-01 2021-12-31 0001770561 us-gaap:SecuredDebtMember 2022-12-31 0001770561 us-gaap:UnsecuredDebtMember 2022-12-31 0001770561 c561:ThirdPartyFinancerMember 2022-12-31 0001770561 c561:BankGuaranteeFacilityMember 2022-12-31 0001770561 c561:StampDutyOnCurraghAcquisitionMember 2022-09-20 0001770561 c561:UnpaidTaxInterestMember 2022-09-20 0001770561 c561:AcquisitionRelatedAccrualsMember 2022-12-31 0001770561 c561:XcoalEnergyAndResourcesMember 2021-01-01 2021-05-27 0001770561 c561:XcoalEnergyAndResourcesMember 2020-01-01 2020-12-31 0001770561 c561:CoronadoGroupLlcMember 2022-12-31 0001770561 c561:CoronadoGroupLlcMember 2021-12-31 0001770561 us-gaap:PerformanceSharesMember c561:Grant2022Member 2022-01-01 2022-12-31 0001770561 us-gaap:RestrictedStockUnitsRSUMember 2022-12-31 0001770561 us-gaap:EmployeeStockOptionMember c561:VestingDate01012023Member 2022-12-31 0001770561 us-gaap:PerformanceSharesMember c561:VestingDate01012023Member 2022-12-31 0001770561 us-gaap:RestrictedStockUnitsRSUMember c561:VestingDate01012023Member 2022-12-31 0001770561 us-gaap:EmployeeStockOptionMember c561:VestingDate01072023Member 2022-12-31 0001770561 us-gaap:PerformanceSharesMember c561:VestingDate01072023Member 2022-12-31 0001770561 us-gaap:RestrictedStockUnitsRSUMember c561:VestingDate01072023Member 2022-12-31 0001770561 us-gaap:EmployeeStockOptionMember c561:VestingDate01012024Member 2022-12-31 0001770561 us-gaap:PerformanceSharesMember c561:VestingDate01012024Member 2022-12-31 0001770561 us-gaap:RestrictedStockUnitsRSUMember c561:VestingDate01012024Member 2022-12-31 0001770561 us-gaap:EmployeeStockOptionMember c561:VestingDate01072024Member 2022-12-31 0001770561 us-gaap:PerformanceSharesMember c561:VestingDate01072024Member 2022-12-31 0001770561 us-gaap:RestrictedStockUnitsRSUMember c561:VestingDate01072024Member 2022-12-31 0001770561 us-gaap:EmployeeStockOptionMember c561:VestingDate31032026Member 2022-12-31 0001770561 us-gaap:PerformanceSharesMember c561:VestingDate31032026Member 2022-12-31 0001770561 us-gaap:RestrictedStockUnitsRSUMember c561:VestingDate31032026Member 2022-12-31 0001770561 us-gaap:EmployeeStockOptionMember c561:VestingDate31032025Member 2022-12-31 0001770561 us-gaap:PerformanceSharesMember c561:VestingDate31032025Member 2022-12-31 0001770561 us-gaap:RestrictedStockUnitsRSUMember c561:VestingDate31032025Member 2022-12-31 0001770561 us-gaap:EmployeeStockOptionMember c561:VestingDate31032024Member 2022-12-31 0001770561 us-gaap:PerformanceSharesMember c561:VestingDate31032024Member 2022-12-31 0001770561 us-gaap:RestrictedStockUnitsRSUMember c561:VestingDate31032024Member 2022-12-31 0001770561 us-gaap:EmployeeStockOptionMember c561:VestingDate31032023Member 2022-12-31 0001770561 us-gaap:PerformanceSharesMember c561:VestingDate31032023Member 2022-12-31 0001770561 us-gaap:RestrictedStockUnitsRSUMember c561:VestingDate31032023Member 2022-12-31 0001770561 us-gaap:AustralianTaxationOfficeMember 2021-12-31 0001770561 c561:AustraliaSegmentMember us-gaap:AustralianTaxationOfficeMember 2021-12-31 0001770561 us-gaap:FairValueMeasurementsRecurringMember 2022-12-31 0001770561 c561:ChessDepositaryInterestsMember us-gaap:SubsequentEventMember c561:UnfrankedOrdinaryDividendMember 2023-02-21 0001770561 c561:ChessDepositaryInterestsMember us-gaap:SubsequentEventMember c561:UnfrankedOrdinaryDividendMember 2023-02-21 2023-02-21 0001770561 c561:XcoalEnergyAndResourcesMember us-gaap:ProductMember 2022-12-31 0001770561 c561:XcoalEnergyAndResourcesMember us-gaap:ProductMember us-gaap:FinancialAssetPastDueMember 2022-12-31 0001770561 c561:XcoalEnergyAndResourcesMember us-gaap:ProductMember 2022-01-01 2022-12-31 0001770561 c561:AcquisitionRelatedAccrualsMember 2021-12-31 0001770561 us-gaap:RevenueFromContractWithCustomerMember srt:ReportableGeographicalComponentsMember us-gaap:GeographicConcentrationRiskMember srt:SouthAmericaMember 2020-01-01 2020-12-31 0001770561 c561:UnitedStatesSegmentMember c561:BuchananAndLoganMember 2022-12-31 0001770561 c561:UnitedStatesSegmentMember c561:GreenbrierSegmentMember 2022-12-31 0001770561 c561:UnitedStatesSegmentMember c561:MonValleyAndRussellCountyMember 2022-12-31 0001770561 us-gaap:ForwardContractsMember 2022-12-31 0001770561 c561:ChessDepositaryInterestsMember 2020-12-31 0001770561 c561:GreenbrierSegmentMember 2020-01-01 2020-12-31 0001770561 c561:CoronadoGroupLlcMember c561:CoronadoGlobalResourcesIncMember 2022-12-31 0001770561 c561:CoalRevenueMember c561:XcoalEnergyAndResourcesMember us-gaap:FinancialAssetPastDueMember 2021-12-31 0001770561 c561:XcoalEnergyAndResourcesMember us-gaap:ProductMember 2021-01-01 2021-12-31 0001770561 c561:XcoalEnergyAndResourcesMember us-gaap:ProductMember 2021-12-31 0001770561 us-gaap:SuretyBondMember 2021-12-31 0001770561 us-gaap:ForwardContractsMember 2022-12-12 0001770561 us-gaap:ForwardContractsMember 2021-12-31 0001770561 c561:NonMarketCoalSupplyAgreementMember 2020-01-01 2020-12-31 0001770561 c561:EquityIncentivePlan2018Member 2022-12-31 0001770561 srt:WeightedAverageMember c561:EquityIncentivePlan2018Member 2022-01-01 2022-12-31 0001770561 us-gaap:EmployeeStockOptionMember c561:VestingDate30122019Member 2022-12-31 0001770561 us-gaap:PerformanceSharesMember c561:VestingDate30122019Member 2022-12-31 0001770561 us-gaap:RestrictedStockUnitsRSUMember c561:VestingDate30122019Member 2022-12-31 0001770561 us-gaap:RoyaltyAgreementsMember 2022-12-31 0001770561 us-gaap:ProductMember 2022-12-31 0001770561 us-gaap:ProductMember 2021-12-31 0001770561 c561:ChessDepositaryInterestsMember 2019-08-05 2019-08-05 0001770561 c561:CoalRevenueMember 2021-12-31 0001770561 c561:AblFacilityMember us-gaap:LetterOfCreditMember 2021-05-12 0001770561 us-gaap:SubsequentEventMember c561:BiAnnualFullyFrankedFixedOrdinaryDividendMember 2023-02-21 iso4217:AUD iso4217:USD xbrli:pure xbrli:shares iso4217:USD xbrli:shares utr:segment iso4217:AUD xbrli:shares
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
___________________________________________________
FORM
10-K
___________________________________________________
(Mark One)
☒
 
ANNUAL REPORT PURSUANT TO SECTION
 
13 OR 15(d) OF THE SECURITIES EXCHANGE ACT
OF 1934
For the fiscal year ended
December 31, 2022
OR
☐
 
TRANSITION REPORT PURSUANT TO SECTION
 
13 OR 15(d) OF THE SECURITIES EXCHANGE
ACT OF 1934
For the transition period from
 
to
 
Commission File Number:
000-56044
___________________________________________________
Coronado Global Resources Inc.
(Exact name of registrant as specified in its charter)
___________________________________________________
Delaware
83-1780608
(State or other jurisdiction of
incorporation or organization)
(I.R.S. Employer
Identification No.)
Level 33, Central Plaza One
,
345 Queen Street
Brisbane, Queensland
,
Australia
,
4000
(Address of principal executive offices) (Zip Code)
(
61
)
7 3031 7777
(Registrant’s telephone number, including area code)
___________________________________________________
Securities registered pursuant to Section 12(b) of the Act:
Title of each class
Trading Symbol(s)
Name of each exchange on which registered
None
None
None
Securities registered pursuant to Section 12(g) of the Act:
Title of each class
Name of each exchange on which registered
Common stock, par value $0.01 per share
None
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.
Yes
 
☐
 
No
 
☒
Indicate by check mark if the registrant is not required to file reports pursuant to Section
 
13 or Section 15(d) of the Act.
Yes
 
☐
 
No
 
☒
Indicate by
 
check mark
 
whether the
 
registrant (1) has
 
filed all
 
reports required
 
to be
 
filed by
 
Section 13 or
 
15(d) of the
 
Securities
Exchange Act of
 
1934 during the
 
preceding 12 months
 
(or for such
 
shorter period that
 
the registrant was
 
required to file
 
such reports),
and (2) has been subject to such filing requirements for the past 90 days.
Yes
 
☒
 
No
 
☐
 
Indicate
 
by
 
check
 
mark
 
whether
 
the
 
registrant
 
has
 
submitted
 
electronically
 
every
 
Interactive
 
Data
 
File
 
required
 
to
 
be
 
submitted
pursuant to Rule 405
 
of Regulation S-T
 
(§232.405 of this
 
chapter) during the preceding
 
12 months (or
 
for such shorter
 
period that
the registrant was required to submit such files).
 
Yes
 
☒
 
No
 
☐
Indicate by
 
check mark
 
whether the
 
registrant is
 
a large
 
accelerated filer, an
 
accelerated filer, a
 
non-accelerated filer, smaller
 
reporting
company,
 
or
 
an
 
emerging growth
 
company.
 
See the
 
definitions
 
of
 
“large accelerated
 
filer,”
 
“accelerated filer,”
 
“smaller
 
reporting
company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
 
Large accelerated filer
☒
Accelerated filer
☐
Non-accelerated filer
☐
Smaller reporting company
☐
Emerging growth company
 
☐
If an
 
emerging growth
 
company,
 
indicate by
 
check mark
 
if the
 
registrant has elected
 
not to
 
use the
 
extended transition period
 
for
complying
 
with
 
any
 
new
 
or
 
revised
 
financial
 
accounting
 
standards
 
provided
 
pursuant
 
to
 
Section 13(a) of
 
the
 
Exchange
 
Act.
 
 
☐
Indicate
 
by
 
check
 
mark
 
whether
 
the
 
registrant
 
has
 
filed
 
a
 
report
 
on
 
and
 
attestation
 
to
 
its
 
management’s
 
assessment
 
of
 
the
effectiveness of its
 
internal control over financial reporting
 
under Section 404(b) of
 
the Sarbanes-Oxley Act (15
 
U.S.C. 7262(b)) by
the registered public accounting firm that prepared or issued its audit report.
 
 
☒
 
 
If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the
 
financial statements of the
registrant included in the filing reflect the correction of an error to previously issued financial statements.
 
☐
Indicate by check mark whether any of those error corrections are restatements that required a recovery
 
analysis of incentive-
based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to
§240.10D-1(b).
☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the
 
Exchange Act).
 
Yes
 
☐
 
No
☒
 
The registrant’s common stock is publicly traded on the Australian Securities Exchange in the form of CHESS Depositary Interests,
or CDIs, convertible
 
at the option
 
of the holders
 
into shares of
 
the registrant’s
 
common stock on
 
a 10-for-1 basis.
 
The aggregate
market value of the registrant’s common stock, par value $0.01
 
per share, in the form of CDIs, held by non-affiliates of the registrant
(without admitting that
 
any person whose shares
 
are not included
 
in such calculation
 
is an affiliate),
 
computed by reference
 
to the
price at which the
 
CDIs were last sold
 
on June 30,
 
2022, the last business
 
day of the
 
registrant’s most recently completed
 
second
fiscal quarter, as reported on the Australian Securities Exchange, was $
945,033,096
.
The total
 
number of
 
shares of
 
the registrant’s
 
common stock,
 
par value
 
$0.01 per
 
share, outstanding
 
on December
 
31, 2022,
 
including
shares of common stock underlying the issued and outstanding CDIs, was
167,645,373
.
DOCUMENTS INCORPORATED BY REFERENCE
Portions of
 
the registrant’s
 
proxy statement
 
to be
 
filed with
 
the Securities
 
and Exchange
 
Commission in
 
connection with
 
the registrants
2023 annual
 
meeting of
 
stockholders are
 
incorporated by
 
reference into
 
Part III
 
of this
 
Annual Report
 
on Form
 
10-K. Documents
incorporated by reference in this report are listed in the Exhibit Index of this Annual Report
 
on Form 10-K.
c561202210Kp3i1 c561202210Kp3i0
Steel starts
here.
Annual Report on Form 10-K for the year ended December 31,
 
2022.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
5
EXPLANATORY
 
NOTE
Unless
 
otherwise
 
noted,
 
references
 
in
 
this
 
Annual
 
Report
 
on
 
Form 10-K
 
to
 
“we,”
 
“us,”
 
“our,”
 
“Company,”
 
or
“Coronado” refer
 
to Coronado
 
Global Resources
 
Inc. and
 
its consolidated
 
subsidiaries and
 
associates, unless
the context indicates otherwise.
All production and sales volumes
 
contained in this Annual Report on Form 10-K are expressed in metric tons, or
Mt,
 
millions
 
of
 
metric
 
tons,
 
or
 
MMt,
 
or
 
millions
 
of
 
metric
 
tons
 
per
 
annum,
 
or
 
MMtpa,
 
except
 
where
 
otherwise
stated. One Mt (1,000 kilograms)
 
is equal to 2,204.62 pounds and
 
is equivalent to 1.10231 short tons.
 
A net ton
is equivalent
 
to a
 
short ton,
 
or 2,000
 
pounds. In
 
addition, all
 
dollar amounts
 
contained herein
 
are expressed
 
in
United States
 
dollars, or
 
US$, except
 
where otherwise
 
stated. References
 
to “A$”
 
are references
 
to Australian
dollars, the
 
lawful currency
 
of the
 
Commonwealth of
 
Australia, or
 
the Commonwealth.
 
Some numerical
 
figures
included in this Annual Report on Form 10-K have been
 
subject to rounding adjustments. Accordingly, numerical
figures shown as totals in certain tables may not equal
 
the sum of the figures that precede them.
CAUTIONARY NOTICE REGARDING FORWARD
 
-LOOKING STATEMENTS
This Annual
 
Report on
 
Form 10-K
 
contains “forward-looking
 
statements” within
 
the meaning
 
of Section
 
27A of
the Securities Act
 
of 1933, as
 
amended, or the
 
Securities Act, and
 
Section 21E of
 
the Securities Exchange
 
Act
of
 
1934,
 
as
 
amended,
 
or
 
the
 
Exchange
 
Act,
 
concerning
 
our
 
business,
 
operations,
 
financial
 
performance
 
and
condition, the coal, steel and other industries, as well as our plans,
 
objectives and expectations for our business,
operations, financial performance and condition. Forward-looking statements may
 
be identified by words such
 
as
“may,”
 
“could,”
 
“believes,”
 
“estimates,”
 
“expects,”
 
“intends,”
 
“plans,”
 
“anticipate,”
 
“forecast,”
 
“outlook,”
 
“target,”
“likely,” “considers”
 
and other similar words.
Any
 
forward-looking
 
statements
 
involve
 
known
 
and
 
unknown
 
risks,
 
uncertainties,
 
assumptions
 
and
 
other
important factors that
 
could cause actual
 
results, performance,
 
events or outcomes
 
to differ
 
materially from
 
the
results,
 
performance,
 
events
 
or
 
outcomes
 
expressed
 
or
 
anticipated
 
in
 
these
 
statements,
 
many
 
of
 
which
 
are
beyond
 
our
 
control.
 
Such
 
forward-looking
 
statements
 
are
 
based
 
on
 
an
 
assessment
 
of
 
present
 
economic
 
and
operating
 
conditions
 
on
 
a
 
number
 
of
 
best
 
estimate
 
assumptions
 
regarding
 
future
 
events
 
and
 
actions.
 
These
factors are difficult to accurately predict and may be beyond our control. Factors that could affect our results, our
announced plans or an investment in our securities include,
 
but are not limited to:
•
 
the prices we receive for our coal;
•
 
uncertainty in
 
global economic
 
conditions,
 
including the
 
extent, duration
 
and impact
 
of the
 
Russia
and Ukraine
 
war,
 
as well
 
as risks
 
related to
 
government actions
 
with respect
 
to trade
 
agreements,
treaties or policies;
•
 
a decrease in the availability or increase in costs of key supplies, capital equipment or commodities,
such as diesel fuel, steel, explosives and tires;
•
 
the extensive
 
forms of
 
taxation that our
 
mining operations are
 
subject to,
 
and for
 
future tax regulations
and developments.
 
For
 
example, the
 
amendments
 
to
 
the coal
 
royalty
 
regime implemented
 
by the
Queensland State
 
Government in
 
Australia introducing higher
 
tiers to
 
the coal
 
royalty rates
 
applicable
to our Australian Operations;
•
 
severe
 
financial
 
hardship,
 
bankruptcy,
 
temporary
 
or
 
permanent
 
shut
 
downs
 
or
 
operational
challenges, due
 
to future
 
public health
 
crisis (such
 
as COVID-19
 
pandemic)
 
of one
 
or more
 
of our
major customers, including
 
customers in the steel
 
industry,
 
key suppliers/contractors, which
 
among
other
 
adverse
 
effects,
 
could
 
lead
 
to
 
reduced
 
demand
 
for
 
our
 
coal,
 
increased
 
difficulty
 
collecting
receivables
 
and
 
customers
 
and/or
 
suppliers
 
asserting
 
force
 
majeure
 
or
 
other
 
reasons
 
for
 
not
performing their contractual obligations to us;
•
 
our ability to generate sufficient cash to service
 
our indebtedness and other obligations;
•
 
our
 
indebtedness
 
and
 
ability
 
to
 
comply
 
with
 
the
 
covenants
 
and
 
other
 
undertakings
 
under
 
the
agreements governing such indebtedness;
•
 
our ability to
 
collect payments
 
from our customers
 
depending on
 
their creditworthiness,
 
contractual
performance or otherwise;
•
 
the demand for steel products, which impacts the demand for
 
our metallurgical, or Met, coals;
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
6
•
 
risks
 
inherent
 
to
 
mining
 
operations
 
could
 
impact
 
the
 
amount
 
of
 
coal
 
produced,
 
cause
 
delay
 
or
suspend coal deliveries, or increase the cost of operating
 
our business;
•
 
the loss of, or significant reduction in, purchases by our
 
largest customers;
•
 
risks
 
unique
 
to
 
international
 
mining
 
and
 
trading
 
operations,
 
including
 
tariffs
 
and
 
other
 
barriers
 
to
trade;
•
 
unfavorable economic and financial market conditions;
•
 
our ability to continue acquiring and developing coal reserves
 
that are economically recoverable;
•
 
uncertainties in estimating our economically recoverable coal
 
reserves;
•
 
transportation for our coal becoming unavailable or uneconomic
 
for our customers;
•
 
the risk that we may be required to pay for unused capacity pursuant to the terms of our take-or-pay
arrangements with rail and port operators;
•
 
our ability to retain key personnel and attract qualified
 
personnel;
•
 
any failure to maintain satisfactory labor relations;
•
 
our ability to obtain, renew or maintain permits and consents
 
necessary for our operations;
•
 
potential costs or
 
liability under applicable environmental
 
laws and regulations,
 
including with respect
to any exposure
 
to hazardous substances
 
caused by
 
our operations, as
 
well as any
 
environmental
contamination our
 
properties may have or our operations may cause;
•
 
extensive regulation of our mining operations and future
 
regulations and developments;
•
 
our ability to provide
 
appropriate financial assurances
 
for our obligations under
 
applicable laws and
regulations;
•
 
assumptions underlying our asset retirement obligations
 
for reclamation and mine closures;
•
 
concerns about the environmental impacts of coal combustion,
 
including possible impacts on global
climate issues,
 
which could
 
result in
 
increased regulation
 
of coal
 
combustion
 
and requirements
 
to
reduce
 
greenhouse
 
gas,
 
or
 
GHG,
 
emissions
 
in
 
many
 
jurisdictions,
 
which
 
could
 
significantly
 
affect
demand for our products or our securities and reduced
 
access to capital and insurance;
•
 
any cyber-attacks or
 
other security breaches that
 
disrupt our operations
 
or result in
 
the dissemination
of proprietary or confidential information about us, our
 
customers or other third parties;
•
 
the risk that we may not
 
recover our investments in
 
our mining, exploration and other
 
assets, which
may require us to recognize impairment charges related
 
to those assets;
•
 
risks related to divestitures and acquisitions;
•
 
the risk that diversity in
 
interpretation and application of
 
accounting principles in the
 
mining industry
may impact our reported financial results; and
•
 
other risks and uncertainties described in Item 1A. “Risk
 
Factors.”
We
 
make
 
many
 
of
 
our
 
forward-looking
 
statements
 
based
 
on
 
our
 
operating
 
budgets
 
and
 
forecasts,
 
which
 
are
based upon
 
detailed assumptions.
 
While we
 
believe that
 
our assumptions
 
are reasonable,
 
we caution
 
that it
 
is
very difficult to
 
predict the impact
 
of known factors,
 
and it is
 
impossible for us
 
to anticipate all
 
factors that could
affect our actual results.
See Item 1A. “Risk Factors” and
 
elsewhere in this Annual Report
 
on Form 10-K for a more
 
complete discussion
of the risks
 
and uncertainties
 
mentioned above
 
and for
 
discussion of other
 
risks and
 
uncertainties we
 
face that
could
 
cause
 
actual
 
results
 
to
 
differ
 
materially
 
from
 
those
 
expressed
 
or
 
implied
 
by
 
these
 
forward-looking
statements.
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
7
All
 
forward-looking
 
statements
 
attributable
 
to
 
us
 
are
 
expressly
 
qualified
 
in
 
their
 
entirety
 
by
 
these
 
cautionary
statements, as well as others made in this Annual
 
Report on Form 10-K and hereafter in our other
 
filings with the
Securities
 
and
 
Exchange
 
Commission,
 
or
 
SEC,
 
and
 
public
 
communications.
 
You
 
should
 
evaluate
 
all
forward-looking statements made by us in the context
 
of these risks and uncertainties.
We caution you that the risks and uncertainties identified by us may not be all of the factors that are important to
you.
 
You
 
should
 
not
 
interpret
 
the
 
disclosure
 
of
 
any
 
risk
 
to
 
imply
 
that
 
the
 
risk
 
has
 
not
 
already
 
materialized.
Furthermore, the forward
 
-looking statements
 
included in this
 
Annual Report on
 
Form 10-K
 
are made only
 
as of
the date hereof.
 
We undertake no
 
obligation to publicly
 
update or revise
 
any forward-looking statement as
 
a result
of new information, future events, or otherwise, except
 
as required by applicable law.
Forward-looking and
 
other statements
 
in this
 
Annual Report
 
on Form
 
10-K regarding
 
our GHG
 
reduction plans
and
 
goals
 
are
 
not
 
an
 
indication
 
that
 
these
 
statements
 
are
 
necessarily
 
material
 
to
 
investors
 
or
 
required
 
to
 
be
disclosed in our filings with the SEC. In addition, historical, current and forward
 
-looking GHG-related statements
may be based on standards for measuring
 
progress that are still developing, internal controls and
 
processes that
continue to evolve and assumptions that are subject to change
 
in the future.
c561202210Kp8i1 c561202210Kp8i0
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
8
PART I
ITEM 1.
 
BUSINESS.
Overview
We
 
are
 
a
 
leading
 
producer,
 
global
 
marketer
 
and
 
exporter
 
of
 
a
 
full
 
range
 
of
 
Met
 
coals.
 
We
 
own
 
a
 
portfolio
 
of
operating
 
mines
 
and
 
development
 
projects
 
in
 
Queensland
 
in
 
Australia,
 
and
 
in
 
Virginia,
 
West
 
Virginia
 
and
Pennsylvania
 
in
 
the
 
United
 
States.
 
We
 
are
 
one
 
of
 
the
 
largest
 
Met
 
coal
 
producers
 
globally
 
by
 
export
 
volume,
serving customers on five continents.
Our operations in Australia, or our Australian
 
Operations, consist of the 100%-owned
 
Curragh producing mining
property located
 
in the
 
Bowen Basin
 
of Australia.
 
Our operations
 
in the
 
United States,
 
or our
 
U.S. Operations,
consist
 
of
 
two
 
producing
 
mining
 
properties
 
(Buchanan
 
and
 
Logan),
 
one
 
temporarily
 
idled
 
mining
 
property
(Greenbrier) and two
 
development mining
 
properties (Mon
 
Valley,
 
and Russell County),
 
primarily located
 
in the
Central Appalachian
 
region of
 
the United
 
States, or
 
CAPP,
 
all of
 
which are
 
100%-owned. Our
 
U.S. Operations
and Australian Operations
 
are strategically located for
 
access to transportation
 
infrastructure. In addition
 
to Met
coal, our Australian Operations sell thermal coal under a long-term legacy contract assumed in the acquisition of
Curragh,
 
which
 
is
 
used
 
to
 
generate
 
electricity,
 
to
 
Stanwell
 
Corporation
 
Limited,
 
or
 
Stanwell,
 
a
 
Queensland
government-owned
 
entity
 
and
 
the
 
operator
 
of
 
the
 
Stanwell
 
Power
 
Station
 
located
 
near
 
Rockhampton,
Queensland,
 
and
 
some
 
thermal
 
coal
 
in
 
the
 
export
 
market.
 
Our
 
U.S.
 
Operations
 
also
 
produce
 
and
 
sell
 
some
thermal coal that is extracted in the process of mining
 
Met coal.
Location of Australian Operations
 
Location of U.S. Operations
Our core business
 
strategy focuses
 
on the production
 
of Met coal
 
for the North
 
American and seaborne
 
export
markets.
 
Met
 
coal
 
is
 
a
 
key
 
ingredient
 
in
 
the
 
production
 
of
 
steel
 
using
 
blast
 
furnaces,
 
and
 
approximately
 
770
kilograms of Met coal is required to produce one ton of steel.
We
 
have
 
a
 
geographically
 
diverse
 
customer
 
base
 
across
 
a range
 
of
 
global
 
markets.
 
Major
 
consumers
 
of
 
our
seaborne Met coal in 2022 were located in high-growth Asian markets, Brazil
 
and Europe. These consumers are
all major
 
global steel or
 
Met coke producers.
 
We are well-positioned
 
in the
 
key high-growth Asian
 
markets (Japan,
South
 
Korea
 
and
 
India)
 
as
 
sales
 
to
 
direct
 
end
 
users
 
in
 
the
 
region
 
represented
 
56.9%
 
of
 
our
 
total
 
revenue,
including Tata
 
Steel Limited, or Tata
 
Steel, which accounted for 19.4% of total revenue,
 
in 2022.
The
 
charts
 
below
 
show
 
our
 
direct
 
sales
 
by
 
geographic
 
region
 
in
 
2022
 
and
 
our
 
sales
 
volume
 
by
 
export
 
and
domestic coal sales in 2020, 2021 and 2022.
c561202210Kp9i0 c561202210Kp9i1 c561202210Kp9i2
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
c561202210Kp9i4
 
 
 
 
 
 
 
 
 
 
 
c561202210Kp9i6
 
 
 
 
 
 
 
 
 
 
 
c561202210Kp9i8
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
9
23%
18%
12%
15%
10%
14%
5%
4%
Customer -FY2022
 
direct sales by coal revenue
Japan
India
South Korea
North America
South America
Europe
Australia
Other Asia countries
75%
25%
FY2020
Export
Domestic
75%
25%
FY2021
Export
Domestic
66%
34%
FY2022
Export
Domestic
Sales volume by export and domestic coal sales
To
 
support our
 
operations, we
 
have proven
 
and probable
 
coal reserves
 
totaling
 
539 MMt
 
as of
 
December 31,
2022, 205 MMt and 334 MMt of which
 
are in Australia and the United States, respectively.
 
For more information
regarding our coal reserves, see Item 2. “Properties.”
History and Australian Public Offering
We were
 
founded in
 
2011
 
by our
 
current Chief
 
Executive Officer,
 
Mr.
 
Garold Spindler,
 
our then
 
President and
Chief
 
Operating
 
Officer,
 
Mr.
 
James
 
Campbell
 
and
 
a
 
private
 
equity
 
fund
 
affiliated
 
with
 
The
 
Energy &
 
Minerals
Group, or EMG, with the intention of evaluating, acquiring
 
and developing Met coal mining properties.
 
Prior to the initial public
 
offering,
 
Coronado Global Resources
 
Inc., was a wholly-owned subsidiary
 
of Coronado
Group LLC, which
 
is currently
 
owned by
 
funds managed
 
by EMG,
 
which we
 
refer to,
 
collectively,
 
as the
 
EMG
Group, and certain members of our management.
On
 
October 23,
 
2018,
 
we
 
completed
 
an
 
initial
 
public
 
offering
 
on
 
the
 
Australian
 
Securities
 
Exchange,
 
or
 
ASX,
which we refer to as the Australian IPO.
As of
 
December
 
31,
 
2022,
 
the
 
EMG Group
 
and
 
management
 
beneficially
 
owned
 
approximately
 
50.4%
 
of the
issued
 
and
 
outstanding
 
shares
 
of
 
our
 
common
 
stock
 
through
 
their
 
ownership
 
of
 
Coronado
 
Group LLC.
 
The
remaining 49.6%
 
was owned
 
by public
 
investors in
 
the form
 
of CDIs traded
 
on the ASX.
 
In addition,
 
Coronado
Group LLC
 
holds
 
one
 
share
 
of
 
preferred
 
stock
 
Series A,
 
par
 
value
 
$0.01
 
per
 
share,
 
of
 
the
 
Company,
 
or
 
the
Series A Share,
 
which is
 
the only
 
share of
 
preferred stock
 
issued and
 
outstanding. The
 
holder of
 
the Series
A
c561202210Kp10i0
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
10
Share
 
is
 
permitted
 
to
 
nominate
 
and
 
elect
 
members
 
of
 
our
 
Board
 
of
 
Directors
 
in
 
relation
 
to
 
the
 
amount
 
of
 
the
holder’s aggregate beneficial ownership of shares of our common stock.
Organizational Structure
The following chart shows our current organizational structure:
* Coronado Global Resources Inc. holds 100%
 
ownership interest in its subsidiaries, unless otherwise
 
stated.
 
Overview of Operations
Met Coal
Met coal is primarily
 
used in the manufacture of
 
coke, which is used
 
in the steel-making process, as
 
well as direct
injection into a blast furnace as a replacement for coke.
Sales of Met coal represented approximately 95.3%
of our total coal revenues for the year ended December 31,
2022. Most of the Met coal
 
that we produce is sold, directly
 
or indirectly,
 
to steel producers. The steel
 
industry’s
demand
 
for
 
Met
 
coal
 
is
 
affected
 
by
 
several
 
factors,
 
including
 
the
 
cyclical
 
nature
 
of
 
that
 
industry’s
 
business,
geopolitical stability,
 
general economic conditions affecting
 
demand for steel, tariffs
 
on steel and steel products,
technological developments in the steelmaking process and the availability and
 
cost of substitutes for steel, such
as aluminum,
 
composites and
 
plastics. We
 
compete based
 
on coal quality
 
and characteristics,
 
price, customer
service and support
 
and reliability of supply.
 
Seaborne Met coal
 
import demand, which
 
is most of our
 
business,
can be significantly impacted by the availability of indigenous coal production, particularly in the
 
leading Met coal
import
 
countries
 
of
 
China
 
and
 
India,
 
among
 
others,
 
and
 
the
 
competitiveness
 
of
 
seaborne
 
Met
 
coal
 
supply,
including
 
from
 
the
 
leading
 
Met
 
coal
 
exporting
 
countries
 
of
 
Australia,
 
the
 
United
 
States,
 
Russia,
 
Canada
 
and
Mongolia,
 
among
 
others.
In
 
2022,
 
the
 
seaborne
 
Met
 
coal
 
market
 
was
 
considerably
 
volatile,
 
driven
 
by
 
supply
concerns in
 
key Met
 
coal
 
markets and
 
continued
 
trade flow
 
disruptions
 
due to
 
sanctions imposed
 
on Russian
coal imports following the Russian invasion of Ukraine.
Thermal Coal
Sales of thermal
 
coal represented approximately
 
4.7% of our
 
total coal revenues
 
for the year
 
ended December
31, 2022.
 
The thermal
 
coal we
 
produce is
 
predominantly a
 
byproduct of
 
mining Met
 
coal. The
 
thermal coal
 
we
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
11
produce
 
is
 
sold,
 
directly
 
or
 
indirectly,
 
to
 
power
 
stations,
 
predominantly
 
Stanwell,
 
as
 
an
 
energy
 
source
 
in
 
the
generation
 
of
 
electricity.
 
Demand
 
for
 
our
 
thermal
 
coal
 
products
 
is
 
impacted
 
by
 
economic
 
conditions,
environmental regulations, demand for
 
electricity, including
 
the impact of energy efficient
 
products, and the cost
of electricity
 
generation
 
from
 
alternative
 
fuels.
 
Our
 
thermal
 
coal
 
products
 
primarily
 
compete
 
with
 
producers
 
of
other forms of electric generation,
 
including natural gas, oil, nuclear, hydro, wind, solar
 
and biomass, that provide
an alternative
 
to coal
 
use.
The Russian
 
invasion of
 
Ukraine impacted
 
global supply
 
dynamics
 
resulting in
 
Met
coal crossover trades into the thermal market caused
 
by increased thermal coal pricing.
Segments
In accordance with
 
Accounting Standards Codification, or
 
ASC, Topic 280,
Segment Reporting
, we have
 
adopted
the following reporting segments:
•
 
Australia; and
•
 
United States.
In addition, “Other and Corporate” is not determined
 
to be a reporting segment but is disclosed
 
for the purposes
of reconciliation to our Consolidated Financial Statements.
These segments are grouped based on geography and reflect how we currently monitor
 
and report the results of
the business to
 
the Chief Executive
 
Officer who is
 
our chief operating
 
decision maker, or CODM.
 
Factors affecting
and
 
differentiating
 
the
 
financial
 
performance
 
of
 
each
 
of these
 
two
 
reportable
 
segments
 
generally
 
include
 
coal
quality,
 
geology,
 
coal
 
marketing
 
opportunities,
 
mining
 
and
 
transportation
 
methods
 
and
 
regulatory
 
issues.
 
We
believe
 
this
 
method
 
of
 
segment
 
reporting
 
reflects
 
the
 
way
 
our
 
business
 
segments
 
are
 
currently
 
managed,
resources are allocated and
 
the way the performance
 
of each segment is evaluated.
 
The two segments
 
consist
of similar operating activities as each segment produces similar
 
products.
Diversification
We have
 
100% ownership
 
over all
 
of our
 
operating mines,
 
allowing us
 
full control
 
over all
 
operating decisions.
This
 
control
 
is
 
critical
 
during
 
times
 
of
 
crisis
 
and
 
allows
 
us
 
to
 
react
 
swiftly
 
and
 
decisively
 
to
 
changes
 
in
 
global
market demands.
 
We benefit from a geographically
 
diverse asset base,
 
in Australia and the United States,
 
with access to multiple
transportation infrastructure options, including key rail and port infrastructure, providing access to both seaborne
export and domestic markets.
 
We have access to
 
the key major markets
 
in both the Atlantic and
 
Pacific basins,
and our wide footprint provides flexibility to respond quickly
 
to changes in global market demands.
Sanctions
 
and
 
bans
 
on
 
Russian
 
coal
 
resulted
 
in
 
European
 
countries
 
seeking
 
alternative
 
sources
 
which
 
also
resulted in Met coal cross trades in the thermal markets, as producers looked to benefit from the price
 
arbitrage.
The low cost
 
nature of our
 
assets is a
 
function of the
 
quality of the
 
assets and the
 
available mine infrastructure
to extract our
 
reserves efficiently.
 
Being geographically
 
diverse allows us
 
to sell products
 
to our customers
 
in a
number of countries. This allows the sales team to leverage these relationships to provide value added solutions
such as blends with third parties, which is margin accretive.
Our Met
 
coal production is
 
diversified across high
 
quality products,
 
such as
 
hard coking coal,
 
or HCC,
 
semi coking
coals,
 
or
 
SCC,
 
and
 
pulverized
 
coal
 
injection,
 
or
 
PCI,
 
coal
 
from
 
our
 
Australian
 
Operations,
 
and
 
significant
production of HCC, comprising high volatile content,
 
or High-Vol,
 
(including sub-category A of High-Vol
 
,
 
or HVA,
and sub-category B of High-Vol,
 
or HVB), coal with medium
 
volatile content, or Mid-Vol, and coal with low
 
volatile
content,
 
or
 
Low-Vol,
 
coals
 
from
 
our
 
U.S.
 
Operations.
 
This
 
broad
 
product
 
range
 
supports
 
a
 
wide
 
variety
 
of
customer
 
requirements
 
and
 
various
 
blending
 
opportunities,
 
being
 
valued
 
for
 
its
 
attractive
 
coke-making
characteristics.
The below charts
 
show Met
 
product ranges
 
for our Australian
 
Operations and
 
our U.S.
 
Operations for
 
the year
ended December 31, 2022.
c561202210Kp12i1 c561202210Kp12i4 c561202210Kp12i5
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
c561202210Kp12i3 c561202210Kp12i2 c561202210Kp12i7
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
c561202210Kp12i0
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
12
58%
8%
34%
Australia
HCC
SCC
PCI
68%
30%
2%
U.S.
Low Vol
High Vol
Mid Vol
We
 
have a
 
dedicated
 
global
 
marketing
 
team
 
that
 
generates
 
direct sales
 
for our
 
Met coal.
 
Our
 
customer
 
base
spans across a full
 
spectrum of key
 
global markets. We
 
sell directly to a
 
number of large,
 
high-quality and well-
known
 
companies
 
in
 
the
 
steel
 
industry
 
globally.
 
Many
 
of
 
our
 
core
 
customers
 
have
 
been
 
our
 
longstanding
customers for over 20 years,
 
and source our products as essential base load,
 
which translates into a long history
of contract
 
renewal for
 
such customers.
 
We are
 
a major
 
supplier to
 
tier one
 
steel mills
 
in Japan,
 
South Korea,
Taiwan,
 
India,
 
Europe,
 
Brazil,
 
North
 
America
 
and
 
China.
 
Given
 
the
 
quality
 
of
 
our
 
diverse
 
customer
 
base,
 
we
believe the
 
demand for
 
our products
 
is fundamentally
 
insulated across
 
all stages
 
of the
 
commodity cycle.
 
This
flexibility provides us the ability to take advantage of favorable
 
market pricing as and where it arises.
2022 Coronado’s coal trade flows
Overview of Australian Operations—Curragh
Curragh is located in
 
Queensland’s Bowen Basin, one of the
 
world’s premier Met coal regions. Curragh
 
has been
operating since
 
1983, and
 
produces a
 
variety of
 
high-quality,
 
low-ash Met
 
coal products.
 
We believe
 
our HCC
product
 
is
 
recognized
 
by
 
steelmakers
 
for
 
its
 
low-ash
 
content,
 
consistency
 
of
 
quality
 
and
 
favorable
 
coking
attributes. We believe that
 
our SCC products are similarly
 
valued, in particular for
 
their low wall pressure, which
makes them suitable for stamp charging coke
 
ovens, and our PCI coal at Curragh
 
is recognized by steelmakers
for its low phosphorus and sulphur content. These Met
 
coal products are exported globally to a diverse customer
base located primarily in Asia.
 
Curragh also produces thermal
 
coal,
 
which is primarily sold domestically
 
under a
long-term contract with Stanwell, with a limited amount
 
being exported.
 
 
c561202210Kp13i0
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
13
94.7%
5.3%
FY22 Coal revenue mix -Australian
Operations
Met
Thermal
Revenues from our Australian Operations represented
 
59.3% of our total revenue for the year ended December
31, 2022. See Item 2. “Properties” for more information regarding
 
Curragh.
 
For the year ended December 31, 2022, 65.3% of the total
 
volume of coal sold by our Australian Operations was
Met coal and 34.7% of the
 
total volume of coal sold
 
by our Australian Operations
 
was thermal coal, the majority
of which is sold to
 
Stanwell. For the year
 
ended December 31, 2022,
 
Curragh sold 6.3
MMt of Met coal
 
into the
seaborne coal
 
markets. The
 
majority
 
of customers
 
purchase
 
multiple grades
 
or products
 
and have
 
purchased
Curragh coal continuously through all stages of the coal/commodity
 
pricing cycle. Curragh’s Met coal is typically
sold
 
on
 
annual
 
contracts
 
negotiated
 
by
 
our
 
Australian
 
Operations’
 
sales
 
managers,
 
with
 
pricing
 
agreed
 
to
bilaterally or with reference
 
to benchmark indices
 
or spot indices. Our
 
Australian Operations have
 
maintained a
high level of contract
 
coverage against planned production. In
 
2022,
 
substantially all of Curragh’s Met
 
coal export
sales were made under term contracts.
Overview of U.S. Operations—Buchanan and Logan
Our producing mining properties in the United States
 
are located in the CAPP region, specifically in Virginia
 
and
West
 
Virginia,
 
which
 
is
 
a
 
highly-developed,
 
active,
 
coal-producing
 
region.
 
Met
 
coal
 
produced
 
by
 
our
 
U.S.
Operations is consumed regionally by North American steel producers or
 
exported by seaborne transportation to
steel producers
 
(primarily in Asia,
 
Europe and South
 
America). The U.S.
 
Operations also
 
produce small quantities
of thermal coal
 
that is extracted
 
in the process
 
of mining Met
 
coal, which is
 
sold predominantly to
 
global export
markets, as well
 
as within North
 
America.
We believe
 
that many regard
 
Met coal from
 
the CAPP region
 
(where
our
 
U.S.
 
Operations
 
are
 
located)
 
to
 
be
 
of
 
the
 
highest
 
quality
 
in
 
the
 
world
 
owing
 
to
 
its
 
generally
 
low-ash
 
and
sulphur
 
content.
 
Our
 
U.S.
 
Operations
 
offer
 
a
 
range
 
of
 
Met
 
coal
 
products,
 
with
 
significant
 
production
 
of
 
HCC,
comprising coal wth High-Vol
 
(including HVA
 
and HVB), coal with Mid-Vol,
 
and coal with Low-Vol.
Sales from our U.S.
 
Operations to export
 
markets are typically
 
priced with reference
 
to a benchmark index.
 
We
generally sell our
 
seaborne coal through
 
intermediaries Free
 
on Rail (Incoterms
 
2010), or FOR,
 
and, therefore,
our realized price on FOR sales does not
 
include transportation to the seaborne port
 
or costs to transload into a
vessel. Consistent
 
with seaborne sales,
 
sales to North
 
American customers
 
are generally sold
 
on a FOR
 
basis
where the customer arrangers for and incurs the cost
 
of transportation to their facility.
 
A portion of our sales is
 
sold to North American steel and coke producers on annual contracts at
 
fixed prices that
do
 
not
 
fluctuate
 
with
 
the
 
benchmark
 
index.
 
The
 
fixed-price
 
nature
 
of
 
these
 
annual
 
contracts
 
provides
 
us
 
with
visibility on our future revenues, as compared to spot sales or sales priced with reference to a benchmark index.
For 2023, we have entered into annual contracts to sell approximately 1.6 MMt Met coal to North American steel
and coke producers.
 
During periods of
 
stable and rising
 
prices, we strive
 
to take advantage
 
of the spot
 
market.
Spot export contracts are negotiated throughout the year. Revenues from our U.S. Operations, in the aggregate,
represented 40.7%
of our total revenue
 
for the year ended
 
December 31, 2022. See
 
Item 2. “Properties” for more
information regarding Buchanan,
 
Logan and the other mining properties that compose our
 
U.S. Operations.
 
c561202210Kp14i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
14
96.3%
3.7%
FY22 Coal revenue mix -U.S.
Operations
Met
Thermal
0%
10%
20%
30%
40%
50%
60%
70%
80%
Xcoal
Tata
Top 5
Top 10
Top
Customers
by coal revenues
FY 22
FY 21
For the year ended December 31, 2022,
 
95.7% of the total volume of
 
coal sold by our U.S. Operations
 
was Met
coal and
 
4.3% was
 
thermal coal.
 
We sold
 
61.7% of
 
total Met
 
coal from
 
our U.S.
 
Operations into
 
the seaborne
Met coal markets for the year ended December 31, 2022.
 
Customers
We sell
 
most of our
 
coal to
 
steel producers,
 
either directly
 
or through
 
intermediaries, such
 
as brokers.
 
We also
sell
 
thermal
 
coal
 
to
 
electricity
 
generators
 
either
 
directly
 
or
 
through
 
intermediaries
 
such
 
as
 
brokers.
 
Major
consumers of our
 
seaborne Met
 
coal in 2022
 
were located
 
in India, China,
 
Japan, South
 
Korea, Taiwan,
 
Brazil
and Europe.
 
These consumers
 
are all
 
major global
 
steel or
 
Met coke
 
producers. The
 
majority of
 
our sales
 
are
made under contracts with terms of typically one year
 
or on a spot basis.
 
Tata
 
Steel
Our U.S. Operations
 
and Australian Operations
 
are parties to
 
Long Term
 
Coal Sale and
 
Purchase Agreements
with TS
 
Global Procurement
 
Company Pte
 
Ltd, or
 
Tata
 
Steel,
 
with ending
 
March 31,
 
2025. These
 
Long Term
Agreements provide for
 
the sale of a
 
minimum aggregate total
 
of 2.25 MMt of
 
coal per contract
 
year across the
Group, consisting of
 
certain specific quantities
 
of HCC, and
 
pulverized coal
 
injection, or PCI,
 
Coal.
 
The coal
 
is
sold Free on
 
Board (Incoterms 2020),
 
or FOB, priced
 
with reference to
 
benchmark indices and
 
the agreements
contain industry
 
standard terms
 
and conditions
 
with respect
 
to delivery,
 
transportation, inspection,
 
assignment,
taxes and performance failure.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
15
Xcoal
In 2022,
 
we
 
sold
 
1.9
 
MMt
 
of coal
 
to
 
Xcoal
 
Energy
 
Resources
 
LLC,
 
or Xcoal,
 
from
 
our U.S.
 
Operations.
 
Coal
revenues from Xcoal represented 28.4%
of coal revenues
 
from our U.S. Operations. Purchase orders with Xcoal
are entered
 
into primarily on
 
an ad hoc
 
(shipment-by-shipment) basis.
 
Xcoal, as
 
well as most
 
other customers,
typically
 
take
 
ownership
 
of
 
coal
 
upon
 
loading
 
into
 
the
 
rail
 
car
 
(FOR)
 
and
 
are
 
responsible
 
for
 
handling
transportation logistics to the port and beyond.
 
Stanwell
We are
 
party to
 
contractual arrangements
 
with Stanwell,
 
including a
 
Coal Supply
 
Agreement, or
 
the CSA,
 
and
the Curragh Mine New Coal Supply Deed, dated August
 
14, 2018, or the Supply Deed.
Under the CSA, we deliver thermal coal from Curragh to Stanwell at an agreed price and quantity.
 
Stanwell may
vary the quantity of thermal coal purchased each year so the total quantity to be delivered to Stanwell each year
cannot
 
be
 
precisely
 
forecast.
 
The coal
 
that
 
we
 
supply
 
to Stanwell
 
constitutes
 
the
 
majority
 
of the
 
thermal
 
coal
production from Curragh. Our cost of supplying coal to Stanwell has
 
been greater than the contracted price paid
by Stanwell during the year ended December 31, 2022 and
 
for prior years.
 
Under the CSA, we also
 
share part of the revenue earned from
 
export Met coal sales (from particular Tenements
(as defined below))
 
with Stanwell
 
through various
 
rebates. The
 
most material
 
rebate is
 
the export
 
price rebate,
which is linked to the realized export coal price for a defined
 
Met coal product, as follows:
•
 
For the
 
first 7.0 MMtpa
 
of export
 
coal sales: when
 
the 12-month trailing,
 
weighted-average realized export
coal price of Reference coal exceeds the Tier
 
1 Rebate Coal Floor Price, we pay a rebate
 
of 25% of the
difference between the realized export coal price and
 
the Tier 1 Rebate Coal Floor
 
Price.
•
 
For export
 
coal sales
 
above 7.0
 
MMtpa: when
 
the 12-month
 
trailing, weighted-average
 
realized export
coal price of Reference coal exceeds the Tier
 
2 Rebate Coal Floor Price, we pay a rebate
 
of 10% of the
difference between the realized export coal price and
 
the Tier 2 Rebate Coal Floor
 
Price.
The CSA also provides for:
•
 
a tonnage rebate to Stanwell per Mt on the first 7.0 MMtpa of export coal sales and
 
on export coal sales
above 7.0 MMtpa; and
•
 
a rebate on run-of-mine, or ROM, coal mined in the Curragh “Pit U
 
East Area.”
The total Stanwell
 
rebate for the
 
year ended
 
December 31,
 
2022, was $166.0
million and has
 
been included in
the
 
Consolidated
 
Statements
 
of
 
Operations
 
and
 
Comprehensive
 
Income
 
included
 
elsewhere
 
in
 
this
 
Annual
Report on Form 10-K.
The Supply
 
Deed grants
 
us the
 
right to
 
mine the
 
coal reserves
 
in the
 
Stanwell Reserved
 
Area, or
 
the SRA.
 
In
exchange, we agreed to certain amendments to the CSA and to
 
enter into a New Coal Supply Agreement, or the
NCSA upon the
 
expiration of the
 
CSA (which is
 
expected to occur
 
in 2027).
 
On July 12,
 
2019, we entered
 
into
the
 
NCSA
 
with
 
Stanwell.
 
From
 
the
 
earlier
 
of
 
the
 
expiry
 
of
 
the
 
CSA,
 
the
 
date
 
of
 
termination
 
of
 
the
 
CSA,
 
and
January 1, 2029, we
 
will continue to supply
 
thermal coal to
 
Stanwell under the
 
NCSA. The term of
 
the NCSA is
expected to be 10 years,
 
and Coronado will supply
 
to Stanwell 2 million ‘Tonnes
 
Equivalent’ of thermal coal
 
per
annum (based
 
on a
 
nominal gross
 
calorific value
 
of 25.6GJ)
 
at a
 
fixed contract
 
price that
 
varies in
 
accordance
with agreed formulae, inclusive
 
of all statutory charges and
 
royalties in respect of
 
coal sold and delivered under
the NCSA. The export rebates which were payable under the CSA are not payable during the term of the NCSA.
 
The
 
supply
 
term,
 
the
 
contract
 
tonnage
 
and
 
the
 
contract
 
price
 
under
 
the
 
NCSA
 
are
 
subject
 
to
 
adjustment
 
in
accordance with a financial
 
model agreed between Stanwell
 
and us. In summary,
 
we have agreed that
 
the total
value of the
 
discount received
 
by Stanwell
 
on coal
 
supplied to
 
it under
 
the NCSA
 
should (by
 
the expiry
 
date of
the NCSA)
 
be equal
 
to
 
the
 
net present
 
value
 
of $155.2
 
million
 
(A$210.0
 
million)
 
as at
 
the
 
date
 
of
 
the
 
Supply
Deed,
using
 
a
 
contractual
 
pre-tax
 
discount
 
rate
 
of
 
13%
 
per
 
annum.
 
The
 
net
 
present
 
value
 
of
 
the
 
deferred
consideration
 
was
 
$243.2
million
 
as
 
of
 
December
 
31,
 
2022.
 
On
 
January
 
18,
 
2021,
 
the
 
Option
 
Coal
 
Supply
Agreement, or
 
the OCSA,
 
contemplated by
 
clause 5
 
of the NCSA
 
was entered
 
into, in
 
respect of
 
the supply
 
of
certain additional coal to Stanwell during the term of the
 
NCSA.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
16
See Item 1A. “Risk
 
Factors—Risks related
 
to the Supply
 
Deed with
 
Stanwell may
 
adversely affect
 
our financial
condition and results of operations.”
Transportation
Coal produced
 
at
 
our mining
 
properties
 
is transported
 
to customers
 
by a
 
combination
 
of road,
 
rail,
 
barge
 
and
ship. See Item 2. “Properties”
 
for descriptions of the transportation infrastructure
 
available to each of our mining
properties. Rail
 
and port
 
services
 
are typically
 
contracted
 
on a
 
long-term,
 
take-or-pay basis
 
in Australia,
 
while
these contracts
 
are typically
 
negotiated on
 
a quarterly
 
basis in
 
the United
 
States.
 
See Item 7.
 
“Management’s
Discussion and Analysis of Financial Condition and Results of Operations
 
—Liquidity and Capital Resources” for
additional information on our take-or-pay obligations.
Australian Operations
Our Australian
 
Operations
 
typically sell
 
export coal
 
FOB, with
 
the customer
 
paying for
 
transportation
 
from the
outbound shipping port.
 
The majority of
 
Curragh’s export
 
Met coal is railed
 
approximately 300 kilometers
 
to the
Port of
 
Gladstone for export
 
via two main
 
port terminals, RG
 
Tanna Coal Terminal,
 
or RGTCT, and Wiggins Island
Coal Export Terminal,
 
or WICET.
 
Curragh also has capacity available
 
to stockpile coal at the Port
 
of Gladstone.
For
 
sales
 
of
 
thermal
 
coal
 
to
 
Stanwell,
 
Stanwell
 
is
 
responsible
 
for
 
the
 
transport
 
of
 
coal
 
to
 
the
 
Stanwell
 
Power
Station.
 
Rail Services
Curragh is
 
linked to
 
the Blackwater
 
rail line
 
of the
 
Central Queensland
 
Coal Network,
 
or CQCN,
 
an integrated
coal
 
haulage
 
rail system
 
owned
 
and
 
operated
 
by
 
Aurizon
 
Network
 
Pty Ltd.,
 
or
 
Aurizon
 
Network.
 
Curragh
 
has
secured
 
annual
 
rail
 
haulage
 
capacity
 
of
 
up
 
to
 
12.0
MMtpa
 
(plus
 
surge
 
capacity)
 
under
 
long-term
 
rail
 
haulage
agreements with Aurizon
 
Operations Limited, or
 
Aurizon Operations, and
 
Pacific National Holdings
 
Pty Limited,
or Pacific National.
 
The RGTCT Coal
 
Transport Services
 
Agreement with Aurizon
 
Operations is for
 
8.5
MMtpa of haulage
 
capacity
to RGTCT. Curragh pays a minimum monthly charge (components of which are payable on a take-or-pay basis),
which is calculated with reference
 
to the below-rail access charges,
 
haulage/freight charges, a minimum
 
annual
tonnage
 
charge
 
and
 
other
 
charges.
 
The
 
RGTCT
 
Coal
 
Transport
 
Services
 
Agreement
 
terminates
 
on
 
June 30,
2030.
The Coal
 
Transport
 
Services Agreement
 
with Pacific
 
National is
 
for 1.0
 
MMtpa of
 
haulage capacity
 
to RGTCT.
Curragh pays
 
a minimum
 
monthly charge
 
(components of
 
which are
 
payable on
 
a take-or-pay
 
basis), which
 
is
calculated with reference to the below-rail
 
access charges, haulage/freight charges, a
 
minimum annual tonnage
charge and other charges. The
 
Coal Transport Services
 
Agreement with Pacific National terminates
 
on July 31,
2029.
 
The
 
Wiggins
 
Island
 
Rail
 
Project,
 
or
 
WIRP,
 
Transport
 
Services
 
Agreement
 
with
 
Aurizon
 
Operations
 
is
 
for
 
2.5
MMtpa of capacity to WICET.
 
This contract is effectively
 
100% take-or-pay (for a
 
portion of the rail haulage
 
and
all capacity access charges). This agreement expires on June
 
30, 2030.
Port Services
Curragh exports coal
 
through two terminals
 
at the Port
 
of Gladstone, RGTCT
 
and WICET.
 
At RGTCT,
 
Curragh
and
 
Gladstone
 
Port
 
Corporation
 
Limited,
 
or GPC,
 
are
 
parties
 
to
 
a
 
coal
 
handling
 
agreement
 
that
 
expires
 
on
June 30, 2030.
 
The agreement may
 
be renewed
 
at our
 
request and,
 
subject to certain
 
conditions, GPC is required
to agree
 
to the
 
extension
 
if there
 
is capacity
 
at RGTCT
 
to allow
 
the extension.
 
We currently
 
have the
 
right
 
to
export between 7.7 MMtpa and 8.7 MMtpa at our nomination
 
on a take-or-pay basis.
We have
 
a minority
 
interest
 
in WICET
 
Holdings
 
Pty Ltd, whose
 
wholly-owned
 
subsidiary,
 
Wiggins Island
 
Coal
Export Terminal
 
Pty Ltd, or WICET Pty Ltd, owns WICET.
 
Other coal producers who export coal through WICET
also hold
 
shares
 
in
 
WICET
 
Holdings
 
Pty Ltd.
 
In addition,
 
we and
 
the
 
other
 
coal
 
producers
 
(or
 
shippers)
 
have
take-or-pay agreements with WICET Pty
 
Ltd and pay a terminal handling charge
 
to export coal through WICET,
which is
 
calculated
 
by reference
 
to WICET’s
 
annual operating
 
costs, as
 
well as
 
finance costs
 
associated with
WICET
 
Pty Ltd’s
 
external
 
debt
 
facilities.
 
Our
 
take-or-pay
 
agreement
 
with
 
WICET
 
Pty Ltd,
 
or
 
the
 
WICET
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
17
Take
 
-or-Pay
 
Agreement,
 
provides
 
Curragh
 
with
 
export
 
capacity
 
of
 
1.5
 
MMtpa.
 
The
 
WICET
 
Take
 
-or-Pay
Agreement is an “evergreen”
 
agreement, with rolling ten-year
 
terms. If we inform
 
WICET Pty Ltd that we
 
do not
wish to continue to roll the term
 
of the WICET Take
 
-or-Pay Agreement, the term would
 
be set at nine years and
the terminal handling
 
charge payable
 
by us would
 
be increased so
 
that our
 
proportion of WICET
 
Pty Ltd’s debt
is amortized to nil by the end of that nine-year term.
Under
 
the
 
WICET
 
Take
 
-or-Pay
 
Agreement,
 
we
 
are
 
obligated
 
to
 
pay
 
for
 
that
 
capacity
 
via
 
terminal
 
handling
charges, whether utilized or not. The terminal handling charge payable by us can be adjusted by WICET
 
Pty Ltd
if
 
our
 
share
 
of
 
WICET
 
Pty Ltd’s
 
operational
 
and
 
finance
 
costs
 
increases,
 
including
 
because
 
of
 
increased
operational costs or because another shipper defaults
 
and has its capacity reduced to nil. The terminal handling
charge is subject
 
to a financing
 
cap set out
 
in the terminal
 
handling charge methodology
 
and has already
 
been
reached and
 
is in force.
 
If another shipper
 
defaults under
 
its take-or-pay
 
agreement, each
 
remaining shipper
 
is
effectively proportionately liable to pay that defaulting shipper’s share of WICET Pty Ltd’s costs going forward, in
the form of increased terminal handling charges.
If we default under the
 
WICET Take
 
-or-Pay Agreement, we would
 
be obligated to pay a
 
termination payment to
WICET
 
Pty Ltd.
 
The
 
termination
 
payment
 
effectively
 
represents
 
our
 
proportion
 
of
 
WICET
 
Pty Ltd’s
 
total
 
debt
outstanding, based
 
on the
 
proportion of
 
our contracted
 
tonnage to
 
the total
 
contracted
 
tonnage of
 
shippers
 
at
WICET at
 
the time
 
the payment
 
is triggered.
 
Shippers can
 
also become
 
liable to
 
pay the
 
termination
 
payment
where there is a permanent cessation of operations at WICET.
 
Since WICET began shipping export tonnages in
April
 
2015,
 
four
 
WICET
 
Holdings
 
Pty Ltd
 
shareholders
 
have
 
entered
 
into
 
administration
 
and
 
Take
 
-or-Pay
Agreements subsequently terminated, resulting
 
in the aggregate
 
contracted tonnage of shippers
 
decreasing from
27 MMtpa to 15.5 MMtpa.
Under the WICET Take
 
-or-Pay Agreement, we are required
 
to provide security (which is
 
provided in the form of
a bank guarantee). The amount of
 
the security must cover our estimated liabilities as
 
a shipper under the WICET
Take
 
-or-Pay Agreement for the following twelve-month period. If
 
we are in default under
 
the WICET Take-or-Pay
Agreement and
 
are subject
 
to a
 
termination payment,
 
WICET Pty Ltd
 
can draw
 
on the
 
security and
 
apply it
 
to
amounts
 
owing
 
by us.
 
See
 
Item 1A. “Risk
 
Factors—Risks
 
related to
 
our
 
investment
 
in
 
WICET
 
may adversely
affect our
 
financial condition
 
and results
 
of operations”
 
and Item 7.
 
“Management’s
 
Discussion and
 
Analysis of
Financial Condition
 
and Results
 
of Operations—Liquidity
 
and Capital
 
Resources”
 
for additional
 
information
 
on
our take-or-pay obligations.
U.S. Operations
Our
 
U.S.
 
Operations’
 
domestic
 
contracts
 
are
 
generally
 
priced
 
FOR
 
at
 
the
 
mine
 
with
 
customers
 
bearing
 
the
transportation costs from
 
the mine to the
 
applicable end user.
 
For direct sales to
 
export customers, we hold
 
the
transportation
 
contract
 
and
 
are
 
responsible
 
for
 
the
 
cost
 
to
 
the
 
export
 
facility,
 
and
 
the
 
export
 
customer
 
is
responsible
 
for
 
the
 
transportation/freight
 
cost
 
from
 
the
 
export
 
facility
 
to
 
the
 
destination.
 
A
 
portion
 
of
 
our
 
U.S.
export sales
 
are made
 
through Xcoal and
 
other intermediaries. For
 
these sales, Xcoal
 
or the
 
intermediary typically
take ownership of
 
the coal as
 
it is loaded
 
into the railcar. The intermediary
 
is responsible for
 
the rail transportation
and port costs.
Rail Services
Our U.S. Operations
 
are served by
 
Northfork Southern
 
and CSX Transportation
 
railroads. In
 
2022, we shipped
approximately 94.7% of our total shipments via rail from
 
our U.S. mining properties.
Northfork Southern
 
railroad serves
 
our Buchanan
 
mining property
 
and transports
 
Buchanan’s coal
 
to Lamberts
Point Coal
 
Terminal
 
Pier 6
 
and to
 
CNX Marine
 
Terminal
 
for export
 
customers and
 
to our
 
domestic customers
either directly
 
or
 
indirectly
 
via inland
 
river
 
dock
 
facilities
 
where
 
the coal
 
is transloaded
 
on
 
to
 
barges
 
and
 
then
transported to the customer’s facilities.
CSX
 
Transportation
 
railroad
 
serves
 
our
 
Logan
 
and
 
Greenbrier
 
mining
 
properties.
 
CSX
 
transports
 
Logan
 
and
Greenbrier’s coal to Kinder
 
Morgan Pier IX Terminal
 
or CNX Marine Terminal
 
or Dominion Terminal
 
Associates
(DTA)
 
for
 
export
 
customers
 
and
 
either
 
directly
 
to
 
the
 
customers
 
or
 
to
 
inland
 
river
 
dock
 
facilities
 
for
 
domestic
customers.
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
18
Port Services
Norfolk
 
Southern’s
 
Lamberts
 
Point
 
Coal
 
Terminal
 
Pier
 
6
 
is
 
the
 
largest
 
coal
 
loading
 
facility
 
in
 
the
 
Northern
Hemisphere with 48 million tons
 
of annual export capacity
 
and is the main terminal
 
at Lamberts Point located
 
in
Norfolk, Virginia.
 
Kinder Morgan’s
 
Pier IX
 
is a
 
coal export
 
terminal with
 
an annual
 
export capacity
 
of 16
 
million
tons located in the Port of Hampton Roads in Newport
 
News, Virginia.
Our U.S. Operations have dedicated inventory capacity
 
and a take-or-pay obligation to transload one million
 
net
tons per
 
year through
 
Kinder Morgan’s
 
Pier IX
 
Terminal
 
to the
 
end of
 
March 2024.
 
On March
 
1, 2022,
 
we re-
assigned
 
700,000
 
net
 
tons
 
per
 
year
 
to
 
Xcoal
 
for
 
a
 
consideration,
 
reducing
 
our
 
dedicated
 
capacity
 
at
 
Kinder
Morgan’s Pier IX Terminal
 
to 300,000 net tons per year to March 2024. On November 1, 2022,
 
we extended our
arrangement with Kinder Morgan from April 2024 to March 2027,
 
with an option to extend for an additional three
years, for a dedicated inventory
 
capacity and take-or-pay obligation
 
to transload 650,000 net tons
 
per year.
 
Our
U.S. Operations also have alternate port access through CNX Marine Terminal which is a transshipping terminal
at the Port of Baltimore owned by CONSOL Energy.
Suppliers
The principal
 
goods we
 
purchase
 
in support
 
of our
 
mining activities
 
are mining
 
equipment, replacement
 
parts,
diesel fuel, natural gas, ammonium-nitrate
 
and emulsion-based explosives, off
 
-road tires, steel-related products
(including roof control materials), lubricants and electricity.
 
As a general matter, we have many well-established,
strategic relationships
 
with our
 
key suppliers
 
of goods
 
and do not
 
believe that
 
we are
 
dependent on
 
any of
 
our
individual suppliers.
We
 
also
 
depend
 
on
 
several
 
major
 
pieces
 
of
 
mining
 
equipment
 
and
 
facilities
 
to
 
produce
 
and
 
transport
 
coal,
including, but not limited to, longwall mining systems,
 
continuous miners, draglines, dozers, excavators, shovels,
haul trucks, conveyors,
 
coal preparation plants,
 
or CPPs, and
 
rail loading and
 
blending facilities. Obtaining
 
and
repairing these
 
major pieces
 
of equipment and
 
facilities often
 
involves long
 
lead times.
 
We strive
 
to extend
 
the
lives of existing equipment and facilities through maintenance practices and equipment rebuilds in order to defer
the requirement for larger capital purchases. We use our global leverage with major suppliers
 
to support security
of
 
supply
 
to
 
meet
 
the
 
requirements
 
of
 
our
 
active
 
mines.
 
See
 
Item 2.
 
“Properties”
 
for
 
more
 
information
 
about
operations at our mining properties.
We use
 
contractors
 
and other
 
third parties
 
for exploration,
 
mining and
 
other services,
 
generally,
 
and rely
 
on a
number
 
of
 
third
 
parties
 
for
 
the
 
success
 
of
 
our
 
current
 
operations
 
and
 
the
 
advancement
 
of
 
our
 
development
projects.
 
See
 
Item
 
1A.
 
“Risk
 
Factors—Our
 
profitability
 
could
 
be
 
affected
 
adversely
 
by
 
the
 
failure
 
of
 
suppliers
and/or outside contractors to perform.”
Competition
We operate
 
in a competitive
 
environment. We
 
compete with domestic
 
and international coal
 
producers, traders
and brokers.
 
We compete on price, coal quality, transportation, optionality, reputation and reliability. Demand for
Met coal and the prices that we will be able to obtain
 
for our Met coal are highly competitive and
 
are determined
predominantly by
 
world markets,
 
which are
 
affected by
 
numerous factors
 
beyond our
 
control, including
 
but not
limited to:
 
•
 
general global, regional and local economic activity;
•
 
changes in demand for steel and energy;
•
 
industrial production levels;
•
 
short-term constraints, including weather incidents;
•
 
changes in the supply of seaborne coal;
•
 
technological changes;
•
 
changes in international freight or other transportation infrastructure
 
rates and costs;
•
 
the costs of other commodities and substitutes for coal
 
;
•
 
market changes in coal quality requirements;
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
19
•
 
government regulations which restrict, or increase the
 
cost of, using coal;
•
 
tariffs
 
imposed
 
by
 
countries,
 
including
 
the
 
United
 
States
 
and
 
Australia,
 
on
 
the
 
import
 
of
 
certain
 
steel
products and any retaliatory tariffs by other countries
 
;
 
and
•
 
tax impositions on the resources industry,
 
all of which are outside of our control;
In addition, coal prices are highly
 
dependent on the outlook for coal consumption in
 
large Asian economies, such
as China, Japan, South Korea and India,
 
as well as any changes in government
 
policy regarding coal or energy
in those countries.
 
In developing our
 
business plan and
 
operating budget, we
 
make certain assumptions
 
regarding future Met
 
coal
prices, coal demand and
 
coal supply. The prices we receive for
 
our Met coal depend on
 
numerous market factors
beyond our control. Accordingly,
 
some underlying coal price assumptions relied on by us may materially change
and
 
actual
 
coal
 
prices
 
and
 
demand
 
may
 
differ
 
materially
 
from
 
those
 
expected.
 
Our
 
business,
 
operating
 
and
financial
 
performance,
 
including
 
cash
 
flows
 
and
 
asset
 
values,
 
may
 
be
 
materially
 
and
 
adversely
 
affected
 
by
short- or long-term volatility in the prevailing prices of
 
our products.
Competition in
 
the coal
 
industry is based
 
on many
 
factors, including, among
 
others, world supply
 
price, production
capacity,
 
coal
 
quality
 
and
 
characteristics,
 
transportation
 
capability
 
and
 
costs,
 
blending
 
capability,
 
brand
 
name
and diversified operations. We are
 
subject to competition from
 
producers in Australia, the
 
United States, Canada,
Russia,
 
Mongolia
 
and
 
other
 
coal
 
producing
 
countries.
 
See
 
Item 1A.
 
“Risk
 
Factors—We
 
face
 
significant
competition, which could adversely affect profitability.”
Environmental Sustainability
We are focused on extracting high quality Met coal in an environmentally responsible way.
 
Coal mining is one of
the most
 
environmentally
 
regulated
 
industries
 
in the
 
world,
 
and
 
it is
 
vital
 
that
 
we
 
consistently
 
meet
 
or exceed
relevant regulatory standards.
We are subject to various environmental laws, regulations and public policies in Australia
 
and the United States.
Managing
 
our
 
environment
 
and
 
climate
 
change
 
risks
 
is
 
a
 
key
 
component
 
of
 
our
 
corporate
 
strategy
 
and
 
it
 
is
integrated into all stages
 
and areas or our
 
daily operations. We
 
seek to minimize
 
our environmental impact and
ensure we meet or exceed our legislative and regulatory
 
environmental obligations.
 
Coronado’s environmental
 
sustainability initiatives
 
and strategy are
 
discussed further
 
in our 2021
 
Sustainability
Report
 
published
 
on
 
May
 
10,
 
2022,
 
which
 
can
 
be
 
found
 
on
 
our
 
website
 
at
www.coronadoglobal.com/sustainability/
 
.
 
Nothing
 
on
 
our
 
website,
 
including
 
our
 
2021
 
Sustainability
 
Report
 
or
sections thereof,
 
shall be
 
deemed
 
incorporated by
 
reference
 
into this
 
Annual Report
 
on Form
 
10-K. Our
 
2022
Sustainability Report is expected to be available in May
 
2023.
 
Climate change
 
We believe that
 
climate change is
 
a complex challenge
 
that requires action
 
at all
 
levels of
 
society. Climate change
can
 
heighten
 
existing
 
physical
 
and
 
non-physical
 
impacts
 
and
 
risks
 
and
 
introduce
 
new
 
ones
 
that
 
can
 
affect
business performance in the near and long-term.
While our operations
 
are recognized as
 
vital contributors to
 
the communities and
 
economies in which
 
we operate,
we acknowledge that
 
our mining activities
 
create Greenhouse
 
Gas (GHG)
 
emissions. Climate change
 
is one of
the
 
most
 
significant
 
issues
 
for
 
the
 
steel
 
industry
 
and
 
the
 
industry
 
has
 
made
 
significant
 
reductions
 
in
 
GHG
emissions
 
by
 
improving
 
energy
 
efficiency
 
and
 
using
 
new
 
technologies.
 
Where
 
possible,
 
we
 
are
 
continuing
 
to
identify and
 
implement GHG emissions
 
and energy
 
reduction opportunities across
 
our business,
 
whilst monitoring
climate related
 
risks
 
and the
 
sustainability
 
of our
 
operations.
 
We are
 
committed to
 
working with
 
other industry
partners to
 
support, develop
 
and introduce
 
new coal
 
production and
 
energy-generation technologies,
 
that help
reduce the environmental impact while continuing to meet
 
global energy and steel demands.
Our Australian
 
Operations operate
 
under an
 
Environmental Management
 
System, or
 
EMS, in
 
accordance
 
with
ISO 14001 that contains set
 
plans and procedures to ensure
 
all environmental commitments are
 
met. The EMS
is
 
used
 
as
 
a
 
tool
 
to
 
uphold
 
our
 
Australian
 
Operations’
 
Environmental
 
Policy
 
and
 
integrate
 
environmental
compliance into
 
all facets
 
of the
 
business. Our
 
Australian Operations
 
disclose GHG
 
Scope 1
 
and 2
 
emissions
annually to the Clean Energy Regulator under the National Greenhouse
 
and Energy Reporting Scheme.
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
20
Our
 
U.S.
 
Operations
 
undergo
 
detailed
 
internal
 
inspections
 
as
 
well
 
as
 
rigorous
 
evaluations
 
by
 
both
 
state
 
and
federal inspectors
 
on a
 
regular basis.
 
Our U.S.
 
Operations
 
disclose GHG
 
Scope 1
 
and 2
 
emissions, including
fugitive emissions
 
(methane),
 
for the
 
facilities
 
required
 
to report
 
their
 
emissions
 
annually
 
to the
 
United
 
States
Environmental Protection Agency.
 
Our
 
operations
 
are
 
currently
 
focused
 
on
 
implementing
 
reporting
 
improvements,
 
identifying
 
opportunities
 
for
reducing
 
emissions
 
on
 
a
 
per
 
ton
 
of
 
production
 
basis
 
and
 
benchmarking
 
ourselves
 
against
 
our
 
peer
 
group.
Coronado launched its first set of GHG targets
 
in 2022 and has committed to targeting reductions
 
in its Scope 1
and 2 emissions by 30% by 2030.
 
Emissions
 
reduction
 
estimates
 
to 2030
 
have
 
been evaluated
 
based
 
on improvements
 
that
 
can reasonably
 
be
expected using
 
technologies
 
currently available.
 
Detailed
 
analysis to
 
determine
 
economic
 
viability of
 
available
technologies has not been considered.
The target reduction of 30% by 2030
 
is based in the current mine plans for Coronado's
 
Curragh and U.S. mines
and
 
is
 
not
 
expected
 
to
 
be
 
a
 
linear
 
reduction.
 
As
 
we
 
address
 
our
 
material
 
areas
 
of
 
impact
 
including
 
emission
reductions and opportunities, the need for mitigation technologies
 
are likely to increase.
We are
 
also evaluating
 
a range
 
of potential
 
projects that
 
could have
 
a positive
 
impact on
 
our emissions
 
profile
including options for
 
energy generation from
 
solar,
 
wind and gas
 
along with on-grid
 
solutions. For example,
 
we
began a project to understand and define gas reservoirs at Curragh with gas production drilling that commenced
in
 
the
 
fourth
 
quarter
 
of
 
2022.
 
This
 
project
 
will
 
continue
 
into
 
2023
 
with
 
well
 
completion
 
and
 
an
 
anticipated
downstream trial of running gas converted haul trucks using the incidental coal seam gas from our operations as
a diesel substitute.
 
Similarly, on July 27,
 
2022, we
 
officially commissioned the
 
Buchanan Ventilation Air Methane,
 
or VAM, abatement
project
 
on
 
vent
 
shaft
 
16
 
at
 
our
 
U.S.
 
Operations.
 
The
 
project
 
utilizes
 
the
 
latest
 
technology
 
to
 
convert
 
fugitive
methane
 
gas
 
emissions
 
to
 
carbon
 
dioxide.
 
The
 
goal
 
of
 
this
 
project
 
is
 
to
 
reduce
 
the
 
Buchanan
 
mine
 
methane
emissions
 
by
 
approximately
 
22
 
times
 
and
 
reduce
 
total
 
emissions
 
from
 
the
 
mine
 
by
 
61%
 
by
 
2030.
 
The
 
initial
performance
 
from
 
the
 
VAM
 
unit
 
is
 
encouraging
 
with
 
the
 
project
 
achieving
 
94%
 
emission
 
reduction
 
efficiency.
While Coronado
 
is also
 
exploring other
 
projects to
 
reduce its
 
carbon footprint,
 
if the
 
VAM projections are achieved,
it may alone result in the Company meeting their target
 
reduction by 2030.
Increased public concern may result in
 
additional regulatory risks as new laws and
 
regulations aimed at reducing
GHG emissions come into effect in the jurisdictions in which we operate. Any legislation that limits or taxes GHG
emissions could adversely impact our growth, increase our operating
 
costs, or reduce demand for our coal.
 
With
 
respect
 
to
 
physical
 
climate
 
risks,
 
our
 
operations
 
may
 
be
 
impacted
 
by
 
weather-related
 
events
 
potentially
resulting in lost production, supply chain disruptions and increased
 
operating costs, which could have a material
adverse impact on our financial results of operations.
 
Increasingly, both foreign and domestic banks, insurance companies and large investors are curtailing or ending
their financial
 
relationships with
 
fossil fuel-related
 
companies. This
 
has or
 
is likely
 
to continue
 
to have
 
adverse
impacts on the liquidity and operations of coal producers.
Additionally, federal,
 
state and international GHG and climate
 
change initiatives, associated regulations or
 
other
voluntary commitments
 
to reduce
 
GHG emissions
 
could significantly
 
increase the
 
cost of
 
coal
 
production
 
and
consumption, increase costs as
 
a result of
 
regulations requiring the installation
 
of emissions control technologies,
increase expenses associated with
 
the purchase of emissions reduction
 
credits to comply with future
 
emissions
trading
 
programs,
 
or
 
significantly
 
reduce
 
coal
 
consumption
 
through
 
implementation
 
of
 
a
 
future
 
clean
 
energy
standard. Such
 
initiatives and
 
regulations could
 
further reduce
 
demand or
 
prices for
 
our coal
 
in both
 
domestic
and international markets,
 
could adversely affect
 
our ability to
 
produce coal and
 
to develop our
 
reserves, could
reduce the value
 
of our coal
 
and coal reserves, and
 
may have a
 
material adverse effect on
 
our business, financial
condition and results of operations.
On November 20, 2022,
 
the Sharm el-Sheik
 
Conference of Parties 27,
 
or COP27, maintained
 
language around
fossil fuels from
 
Glasgow Conference of Parties
 
26, which called
 
on governments to accelerate
 
the dissemination
of technologies,
 
and
 
the adoption
 
of
 
policies, to
 
transition
 
toward
 
a low-emission
 
energy system,
 
including
 
by
accelerating the
 
phasedown of
 
unabated coal
 
power,
 
that is
 
coal power
 
that does
 
not include
 
the capture
 
and
storage of carbon dioxide emission and phase-out inefficient
 
fossil fuel subsidies.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
21
Human Capital Disclosures
Our ability to
 
attract and
 
retain skilled,
 
motivated and
 
engaged employees
 
is an
 
essential part
 
of our
 
business.
Investing in the skill and capabilities of our people will underwrite our
 
long-term growth and sustainability. In both
Australia
 
and
 
United
 
States,
 
we
 
operate
 
in
 
regional
 
locations
 
with
 
highly
 
competitive
 
labor
 
markets.
 
In
 
each
location,
 
we
 
are
 
creating
 
a
 
high-performing
 
workforce
 
with
 
a
 
talent
 
pipeline
 
for
 
future
 
leaders,
 
including
succession planning for critical roles. To
 
achieve this, we continue to create a
 
culture that welcomes and values
all people and
 
where our core
 
values of collaboration,
 
accountability,
 
respect and excellence
 
are demonstrated
in everything that we do.
In 2022, a number of initiatives were undertaken to enhance our culture, increase
 
our ability to attract and retain
the workforce we
 
need, and to
 
continue to drive
 
our desire to
 
build safe, high-performing
 
teams. This has
 
included
extensive efforts to gather feedback from our
 
employees and contracting partners through surveys, focus groups
and
 
team
 
empowerment
 
sessions.
 
Following
 
analysis
 
of
 
the
 
feedback,
 
priorities
 
were
 
identified,
 
and
 
cultural
programs designed to
 
bridge gaps between
 
current and desired
 
cultural states were
 
developed and implemented.
 
Worldwide we had 1,735
employees as of December 31, 2022.
 
In addition, as of December 31,
 
2022, there were
2,326 contractors supplementing the permanent workforce,
 
primarily at Curragh.
As of
 
December 31,
 
2022, approximately
 
11.5%
 
of our
 
total employees,
 
all at
 
our Australian
 
Operations, were
covered by a single, federally-certified collective Enterprise Agreement, or the EA, for specified groups
 
of mining
and maintenance
 
employees.
 
In May
 
2019, the
 
Australian Fair
 
Work Commission
 
approved the
 
Curragh Mine
Enterprise Agreement 2019. This EA has
 
a nominal expiration date of May 26,
 
2022 and will remain in
 
place until
replaced
 
or
 
terminated
 
by
 
the
 
Fair
 
Work
 
Commission.
 
We
 
have
 
been
 
negotiating
 
with
 
employee
 
bargaining
representatives for a replacement EA
 
since March 2022. Those negotiations
 
continue in good faith
 
with the intent
of reaching an agreement as soon as practicable. Our U.S. Operations
 
employ a 100% non-union labor force.
Safety
Our
 
employees
 
and
 
contractors
 
are
 
our
 
most
 
valuable
 
assets
 
and
 
we
 
consider
 
their
 
safety
 
our
 
number
 
one
priority.
 
Safety is
 
essential to
 
all business
 
functions and
 
is never
 
to be
 
compromised, under
 
any circumstance.
The
 
health
 
and
 
safety
 
of
 
our
 
people
 
is
 
reinforced
 
every
 
day
 
through
 
our
 
culture,
 
behaviors,
 
training,
communication and procedures.
 
We manage safety and health
 
through continuous improvement efforts
 
and the implementation of practices
 
and
procedures that
 
address safety risks
 
in full
 
compliance with
 
the legal
 
and regulatory frameworks
 
of both
 
the United
States and Australia.
 
We empower our
 
people to consistently
 
strive to have
 
a safety mindset,
 
and act by
 
applying,
managing and monitoring
 
effective controls
 
to prevent
 
adverse outcomes with
 
all activities and
 
operations. Our
programs
 
are
 
intended
 
to
 
reinforce
 
our
 
position
 
that
 
safety
 
and
 
health
 
should
 
always
 
be
 
front
 
of
 
mind
 
for
 
all
employees and contractors.
 
Safety
 
performance
 
is
 
monitored
 
through
 
physical
 
observations
 
from
 
both
 
internal
 
and
 
external
 
parties
 
and
through the
 
reporting of
 
key metrics.
 
Safety performance
 
is assessed
 
monthly against
 
internal goals
 
and on
 
a
quarterly basis is benchmarked against our peers within the
 
mining industry.
 
We set targets
 
for safety interactions
 
which is a process
 
where employees observe
 
a risk behavior and
 
provide
immediate feedback
 
if it
 
is deemed,
 
or has the
 
potential to
 
be, unsafe.
 
This is
 
monitored by
 
management daily
through safety meetings,
 
site visits, employee
 
discussions, and management
 
observations. The process
 
allows
for greater empowerment, innovation and employee input
 
into the mining process.
 
The 12-month
 
rolling average
 
Total
 
Reportable Injury
 
Frequency Rate
 
(“TRIFR”) as
 
of December
 
31, 2022
 
for
our Australian Operations was 3.92 and
 
the Total Reportable Incident Rate (“TRIR”) for 12-month rolling average
as of
 
December
 
31, 2022
 
for our
 
U.S. Operations
 
was
 
2.42. As
 
indicated
 
in the
 
graphs below,
 
our Australian
Operations
 
outperformed
 
the
 
Queensland
 
industry
 
average
 
in
 
2021
 
and
 
2022
 
and
 
our
 
U.S.
 
Operations
outperformed the U.S. national average in
 
2021 and 2022. We strive to
 
ensure that we continue to
 
provide a safe
operating environment for all employees and contractors.
 
 
 
 
 
 
c561202210Kp22i0 c561202210Kp22i2 c561202210Kp22i4 c561202210Kp22i6 c561202210Kp22i8 c561202210Kp22i10 c561202210Kp22i12 c561202210Kp22i14 c561202210Kp22i16 c561202210Kp22i18 c561202210Kp22i20
 
 
 
 
 
 
c561202210Kp22i22 c561202210Kp22i24 c561202210Kp22i26 c561202210Kp22i28 c561202210Kp22i30 c561202210Kp22i32 c561202210Kp22i34 c561202210Kp22i36 c561202210Kp22i38 c561202210Kp22i40 c561202210Kp22i42
 
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
22
0
4
8
12
2022 Australian Operations
 
(TRIFR)
Australian Operations
Industry
1
2.5
4
2022 U.S. Operations (TRIR)
U.S. Operations
Industry
Workforce composition and diversity
Our
 
values
 
(CARE
 
–
 
Collaboration,
 
Accountability,
 
Respect,
 
Excellence)
 
guide
 
our
 
policies,
 
processes
 
and
actions as they
 
relate to
 
all workforce
 
interactions and
 
people related
 
initiatives. As
 
part of these
 
values and
 
to
enable our people to excel within the workplace we are building a diverse and inclusive workforce, where unique
viewpoints are
 
heard, valued
 
and respected.
 
We believe
 
this directly
 
impacts the
 
safety and
 
productivity of
 
our
people. Our employees are trained to recognize and mitigate
 
potential biases towards others.
We
 
invest
 
in
 
training
 
and
 
development
 
programs
 
for
 
both
 
our
 
new
 
and
 
long-serving
 
employees.
 
Investing
 
in
graduate
 
recruitment,
 
traineeships
 
and
 
internship
 
programs
 
through
 
partnerships
 
with
 
leading
 
education
institutions
 
has
 
been
 
central
 
to
 
accessing
 
talent
 
and
 
building
 
our
 
brand.
 
Further,
 
our
 
internal
 
leadership
development enhances succession planning and the transfer
 
of skills and knowledge across our business.
As at December 31, 2022:
•
 
in the United States, just over 6% of Senior Managers
 
were female.
•
 
in Australia, almost 30%
 
of employees at a General
 
Manager, Senior
 
Manager and Senior Professional
level were female, an increase of approximately 2% from December
 
31, 2021.
•
 
7% of our global workforce was female.
•
 
58.8% of all employees were between the ages of 30 and 50
 
years old.
Attracting and retaining the right people
We continued
 
to focus our
 
efforts on
 
recruiting trainees
 
and other entry
 
level roles. We
 
have also implemented
the following initiatives:
 
•
 
Comprehensive training, performance and leadership development
 
programs.
•
 
Competitive and flexible remuneration structure.
In
 
2022,
 
our
 
total
 
rolling
 
turnover
 
rate
 
was
 
16.0%
 
and
 
16.7%
 
in
 
Australia
 
and
 
the
 
U.S.,
 
respectively,
 
and
 
our
voluntary
 
departure
 
rolling
 
turnover
 
rate
 
was
 
14.5%
 
in
 
both
 
Australia
 
and
 
the
 
U.S.
 
In
 
2021,
 
our
 
total
 
rolling
turnover rate was 27.9%
 
and 18.4% and
 
our voluntary departure
 
rolling turnover rate
 
was 17.3% and
 
15.4%, in
Australia and the U.S., respectively.
 
Regulatory Matters—Australia
Our Australian Operations
 
are regulated by the
 
laws and regulations
 
of the Commonwealth
 
of Australia, or
 
Cth,
the State
 
of Queensland,
 
or Qld,
 
and local
 
jurisdictions. Most
 
environmental laws
 
are promulgated
 
at the
 
state
level, but the Australian federal government has a
 
role in approval of actions which have national
 
environmental
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
23
significance.
 
In
 
Queensland,
 
the
 
environmental
 
laws
 
relevant
 
to
 
coal
 
mining
 
include
 
development
 
legislation,
pollution,
 
waste,
 
ecosystem
 
protection,
 
cultural
 
heritage
 
and
 
native
 
title
 
land
 
contamination
 
and
 
rehabilitation
legislation. In addition, the Australian federal government regulates
 
foreign investment and export approvals.
Tenements
We control the
 
coal mining
 
rights at Curragh
 
under 14 coal
 
and infrastructure
 
mining leases, or
 
MLs, and three
mineral development licenses, or MDLs, granted pursuant to the Mineral Resources Act 1989 (Qld).
 
See Item 2.
“Properties” for more information regarding the Tenements.
Mineral Resources Act 1989 (Qld)
The Mineral Resources
 
Act 1989 (Qld)
 
and the Mineral
 
and Energy Resources
 
(Common Provisions)
 
Act 2014
(Qld), together,
 
provide for the
 
assessment, development
 
and utilization of
 
mineral resources in
 
Queensland to
the
 
maximum
 
extent
 
practicable,
 
consistent
 
with
 
sound
 
economic
 
and
 
land
 
use
 
management.
 
The
 
Mineral
Resources
 
Act
 
1989
 
(Qld)
 
vests
 
ownership
 
of
 
minerals,
 
with
 
limited
 
exceptions,
 
in
 
the
 
Crown
 
(i.e., the
 
state
government). A royalty is payable to the Crown for
 
the right to extract minerals. The Mineral Resources Act 1989
(Qld) creates different tenures
 
for different mining activities,
 
such as prospecting, exploring
 
and mining. A ML is
the most important
 
tenure, as it permits
 
the extraction of
 
minerals in conjunction
 
with other required
 
authorities.
The Mineral Resources Act 1989 (Qld) imposes general conditions
 
on a ML.
A person who is the holder
 
of a ML must keep
 
the records necessary to enable the royalty payable
 
by the person
to
 
be
 
ascertained.
 
In
 
2022,
 
the
 
Queensland
 
State
 
Government
 
in
 
Australia
 
amended
 
the
 
Mineral
 
Resources
Regulation
 
2013
 
(Qld)
 
introducing
 
additional
 
higher
 
tiers
 
to
 
the
 
coal
 
royalty
 
rates
 
effective
 
from
 
July
 
1,
 
2022,
increasing the royalty payable by our Australian Operations.
The new tiers applicable in calculating the royalty payable for our Australian Operations from July 1, 2022 are as
set out below:
•
 
7% for average coal price per Mt sold up to and including
 
A$100 per Mt;
•
 
12.5% for average coal price per Mt sold from A$100 to
 
A$150 per Mt;
•
 
15% for average coal price per Mt sold from A$150 to
 
A$175 per Mt;
•
 
20% for average coal price per Mt sold from A$175 to
 
A$225 per Mt;
•
 
30% for average coal price per Mt sold from A$225 to
 
A$300 per Mt; and
•
40% for average coal price per Mt sold above A$300 per
 
Mt.
The royalty
 
payable
 
for
 
coal sold,
 
disposed
 
of or
 
used
 
in
 
a return
 
period
 
is then
 
calculated
 
by multiplying
 
the
royalty rate by the
 
value of the coal.
 
Queensland Revenue
 
Office Royalty
 
Ruling MRA001.1 contains
 
details on
the
 
costs
 
that
 
can
 
(and
 
cannot)
 
be
 
deducted
 
when
 
calculating
 
the
 
applicable
 
royalty
 
and
 
the
 
method
 
for
determining the value of the coal. Where there is a change in legislation
 
or case law that affects the content of a
royalty ruling, the change
 
in the law
 
overrides the royalty ruling—i.e., the
 
Commissioner will determine the royalty
liability in
 
accordance with
 
the changed
 
law.
 
See Item 2.
 
“Properties” for
 
a discussion
 
of the
 
royalties currently
applicable to Curragh.
Mining Rehabilitation (Reclamation)
Mine closure and rehabilitation risks and costs are regulated
 
by Queensland state legislation.
Amongst
 
other
 
things,
 
an
 
Environmental
 
Authority
 
Holder,
 
or
 
EA
 
Holder,
 
must
 
provide
 
the
 
Queensland
 
State
Government with financial assurance for the purpose of drawing upon in the event that an EA Holder defaults on
its obligations to rehabilitate the mine site.
The Mineral
 
and
 
Energy
 
Resources
 
(Financial
 
Provisioning)
 
Act
 
2018 (Qld),
 
or the
 
Financial
 
Provisioning
 
Act
establishes
 
a
 
financial
 
provisioning
 
scheme,
 
or
 
the
 
Scheme,
 
from
 
which
 
the
 
Department
 
of
 
Environment
 
and
Science, or the DES, sources funds to rehabilitate and
 
remediate land subject to mining.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
24
Under the Financial Provisioning Act,
 
all mine operators are required
 
to make a submission
 
to the DES in
 
respect
of an Estimated Rehabilitation Cost, or ERC,
 
for the mine site. The ERC is determined
 
using the DES-approved
ERC calculator.
 
Using this
 
information, the
 
DES sets
 
the ERC
 
for the
 
mine. The
 
DES provides
 
the ERC
 
to the
manager of the
 
Scheme, or
 
the Scheme Manager.
 
The Scheme
 
Manager undertakes
 
a risk assessment
 
of the
mine,
 
which
 
is
 
based
 
upon
 
independent
 
advice
 
from
 
a
 
Scheme
 
risk
 
advisor.
 
It
 
includes
 
detail
 
on
 
the
 
mine
operator’s financial
 
soundness and credit
 
rating, characteristics of
 
the mining operation
 
(e.g., life of mine,
 
or LOM,
and off-take agreements),
 
rehabilitation history,
 
environmental compliance
 
history and the
 
submission made by
the Company.
 
Risk categories include
 
high, moderate, low
 
and very low.
 
If the ERC
 
and risk categories
 
are set
at moderate,
 
low or
 
very low
 
for a
 
mine, then
 
there is
 
a need
 
to pay
 
an annual
 
contribution
 
based on
 
a small
percentage of the ERC to the Scheme. If the category is high, then the operation provides a surety for the whole
ERC and possibly a contribution
 
to the Scheme. The risk
 
assessment of the mine and,
 
therefore, the amount of
the contribution to
 
the fund is assessed
 
and paid annually
 
in perpetuity, or until a
 
clearance certificate is obtained.
 
Each year, the Scheme Manager
 
is required to
 
make an Annual
 
Review Allocation to determine
 
whether the mine
will provide surety or pay a contribution to the Scheme
 
depending on the value of the ERC relating to applicable
environmental authorities, as follows:
1)
 
ERC < A$100,000 - cash surety or bank guarantees
2)
 
ERC = A$100,000 – A$450 million - pay a cash contribution
 
into the Scheme
3)
 
ERC > A$450 million - pay a cash contribution into the
 
Scheme and provide bank guarantees.
Curragh
 
has
 
2
 
environmental
 
authorities,
 
or
 
EAs,
 
which
 
are
 
covered
 
by
 
the
 
Scheme,
 
namely
 
EA
 
number
EPML00643713
 
and
 
EA
 
number
 
EPVX00635313.
 
In
 
October
 
2022,
 
the
 
Scheme
 
Manager
 
completed
 
the
assessment of the Annual Review Allocation for environmental authority number EPML00643713
 
and issued an
Annual
 
Review
 
Allocation
 
of
 
“Moderate”.
 
The
 
moderate
 
rating
 
resulted
 
in
 
Curragh
 
being
 
obliged
 
to
 
make
 
a
financial contribution to the Scheme of 2.75% of the ERC.
 
In January 2023, the Scheme Manager completed an
assessment of the Annual Review
 
Allocation for Environmental Authority Number EPVX00635313 and issued
 
an
Annual
 
Review
 
Allocation
 
of “High”
 
in
 
respect
 
of
 
MDL162
 
requiring
 
Curragh
 
to
 
maintain
 
its historical
 
financial
assurance in respect of 100% of the ERC for Environmental
 
Authority Number EPVX00635313.
The Financial Provisioning Act also requires
 
for a Progressive Rehabilitation and
 
Closure Plan, or a PRCP,
 
with
respect
 
to
 
mined
 
land.
 
This
 
requirement
 
will
 
be
 
integrated
 
into
 
the
 
existing
 
EA
 
processes
 
for
 
new
 
mines,
minimizing the
 
regulatory burden
 
on government
 
and industry.
 
All mining
 
projects carried
 
out under
 
a ML
 
that
make a site-specific
 
EA application will
 
be required to
 
provide a PRCP. If approved by
 
the administering authority,
a stand-alone PRCP
 
schedule will be
 
given to the
 
applicant together with
 
the EA. The
 
PRCP schedule will
 
contain
milestones
 
with
 
completion
 
dates
 
for
 
achieving
 
progressive
 
rehabilitation
 
of
 
the
 
mine
 
site.
 
The
 
Financial
Provisioning Act provided
 
transitional arrangements for three years
 
for the application of the PRCP
 
requirement
to
 
existing
 
mines.
 
The
 
requirement
 
for
 
a
 
PRCP
 
commenced
 
on
 
November
 
1,
 
2019,
 
or
 
the
 
PRCP
 
start
 
date,
however all existing mining operations only transition into the PRCP framework once a transition notice
 
is issued
by the relevant government department. Curragh was issued with a
 
transition notice with respect to its PRCP. Its
application
 
for
 
a
 
proposed
 
PRCP
 
was
 
received
 
by
 
the
 
administering
 
authority
 
on
 
October
 
20,
 
2022.
The
administering
 
authority
 
has
 
requested
 
the
 
Company
 
provide
 
further
 
information
 
to
 
assess
 
the
 
application
 
by
August 28, 2023.
Environmental Protection Act 1994 (Qld)
The
 
primary
 
legislation
 
regulating
 
environmental
 
management
 
of
 
mining
 
activities
 
in
 
Queensland
 
is
 
the
Environmental
 
Protection
 
Act 1994
 
(Qld),
 
or
 
the
 
EP
 
Act. Its
 
objective
 
is to
 
protect
 
Queensland’s
 
environment
while allowing
 
for development
 
that improves
 
the total
 
quality of
 
life, both
 
now and
 
in the
 
future, in
 
a way
 
that
maintains ecologically sustainable
 
development. Under the EP
 
Act, it is an offense
 
to carry out a
 
mining activity
unless the person holds or is acting under an EA for the activity. The EA imposes conditions on a project. It is an
offense to contravene a condition of an
 
EA. In addition to the requirements found
 
in the conditions of an EA, the
holder must
 
also meet
 
its general
 
environmental
 
duty and
 
duty to
 
notify of
 
environmental
 
harm and
 
otherwise
comply with the provisions of the
 
EP Act and the regulations promulgated thereunder. For example, the following
are offenses under the EP Act:
•
 
causing serious or material environmental harm;
•
 
causing environmental nuisance;
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
25
•
 
depositing proscribed water contaminants in waters and related
 
matters; and
•
 
placing contaminants where environmental harm or nuisance
 
may be caused.
The
 
EA
 
holder
 
must
 
also
 
be
 
a
 
registered
 
suitable
 
operator
 
under
 
the
 
EP
 
Act.
 
We
 
are
 
a
 
registered
 
suitable
operator.
We hold
 
EA EPML00643713, which
 
authorizes the
 
mining of black
 
coal, mineral
 
processing, chemical storage,
waste disposal and
 
sewage treatment over
 
the 14 MLs
 
at Curragh on
 
certain conditions. Those
 
conditions include
requirements
 
in relation
 
to
 
air and
 
water quality,
 
regulated structures
 
(e.g., dams),
 
noise and
 
vibration, waste,
land use, rehabilitation and watercourse diversion.
We
 
also
 
hold
 
a
 
range
 
of
 
subsidiary
 
EAs
 
for
 
our
 
Australian
 
Operations.
 
See
 
“—Mining
 
Rehabilitation
(Reclamation)
”
above
for more information regarding the Financial Provisioning
 
Act.
 
Aboriginal Cultural Heritage Act 2003 (Qld)
The Aboriginal Cultural Heritage Act 2003 (Qld) imposes a duty of care on all persons to take all reasonable and
practicable measures to ensure that any activity conducted does not harm
 
Aboriginal cultural heritage. Its object
is to provide effective recognition, protection and conservation
 
of Aboriginal cultural heritage.
We have obligations
 
relating to Aboriginal cultural
 
heritage with respect
 
to a number of
 
cultural heritage objects
and areas located within
 
the area of the
 
Tenements.
 
We work closely
 
with the Aboriginal people
 
to manage the
cultural heritage objects, areas or
 
evidence of archaeological significance, within
 
our mining operations. We
 
are
party to a Cultural Heritage Management Plan (and associated Cultural
 
Services Agreement) with the Gaangalu
Nation People that applies
 
to all of the Tenements.
 
The plan establishes a
 
coordinating committee and sets
 
out
the steps to be followed to manage activities that may impact
 
Aboriginal cultural heritage.
Native Title Act 1993 (Cth)
The Native Title Act
 
1993 (Cth), or NTA,
 
sets out procedures under which
 
native title claims may be lodged
 
and
determined and compensation claimed for
 
the extinguishment or impairment of
 
the native title rights or interests
of Aboriginal peoples. Its object is to provide for the recognition and protection of native title, to establish ways in
which future
 
dealings affecting
 
native title
 
may proceed
 
and to
 
set standards
 
for those
 
dealings, to
 
establish a
mechanism
 
for determining
 
claims to
 
native
 
title
 
and to
 
provide for,
 
or permit,
 
the
 
validation of
 
past
 
acts,
 
and
intermediate period acts, invalidated because of the existence
 
of native title.
With respect to MLs and MDLs
 
granted under the Mineral Resources
 
Act 1989 (Qld) on state land
 
where native
title has not
 
been extinguished,
 
a principle
 
known as
 
the non-extinguishment
 
principle governs.
 
Broadly,
 
under
this principle, native title rights are suspended while the mining tenure,
 
as renewed from time to time, is in force.
The grant
 
(or renewal)
 
of a
 
mining tenure
 
in respect
 
of land
 
where native
 
title may
 
exist must
 
comply with
 
the
NTA
 
to ensure
 
the validity
 
of the tenure.
 
Registered native
 
title claimants
 
have certain
 
notification, consultation
and negotiation rights relating
 
to mining tenures. Where
 
native title is extinguished
 
(i.e., freehold land), the NTA
does not apply.
Regional Planning Interests
The Regional
 
Planning Interests
 
Act 2014
 
(Qld), or
 
the RPI
 
Act manages
 
the impact
 
of resource
 
activities and
other
 
regulated
 
activities
 
in
 
areas
 
of
 
the
 
state
 
that
 
contribute,
 
or
 
are
 
likely
 
to
 
contribute,
 
to
 
Queensland’s
economic, social
 
and environmental
 
prosperity (e.g., competing
 
land use
 
activities on
 
prime farming
 
land). The
RPI
 
Act
 
identifies
 
areas
 
of
 
Queensland
 
that
 
are
 
of
 
regional
 
interest,
 
including
 
strategic
 
cropping
 
areas
 
and
strategic environmental
 
areas. Under the
 
RPI Act,
 
conducting a resource
 
activity in an
 
area of regional
 
interest
requires
 
a
 
regional
 
interest
 
development
 
approval,
 
unless
 
operating
 
under
 
an
 
exemption.
 
Importantly,
pre-existing mining activities being undertaken at the date of
 
the introduction of the legislation are exempt.
We
 
have
 
been
 
granted
 
a
 
regional
 
interest
 
development
 
approval
 
for
 
the
 
“Curragh
 
Expansion
 
Project”
 
(for
ML700006,
 
ML
 
700007
 
and
 
ML700008),
 
which
 
is
 
subject
 
to
 
regional
 
interest
 
conditions,
 
such
 
as
 
mitigation.
Certain protection conditions
 
are also imposed
 
on us with respect
 
to ML 80171,
 
which includes an
 
obligation to
provide mitigation in the event that strategic cropping land
 
is impacted by future operations.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
26
Environmental Protection and Biodiversity Conservation
 
Act 1999 (Cth)
The Environment Protection
 
and Biodiversity Conservation
 
Act 1999 (Cth),
 
or the EPBC Act,
 
provides a federal
framework
 
to
 
protect
 
and
 
manage
 
matters
 
of
 
national
 
environmental
 
significance,
 
such
 
as
 
listed
 
threatened
species
 
and
 
ecological
 
communities
 
and
 
water
 
resources.
 
In
 
addition,
 
the
 
EPBC
 
Act
 
confers
 
jurisdiction
 
over
actions
 
that
 
have
 
a
 
significant
 
impact
 
on
 
the
 
environment
 
where
 
the
 
actions
 
affect,
 
or
 
are
 
taken
 
on,
Commonwealth land, or are carried out by a Commonwealth agency.
Under the
 
EPBC Act, “controlled
 
actions” that have
 
or are likely
 
to have a
 
significant impact on
 
a matter
 
of national
environmental significance are subject
 
to a rigorous assessment
 
and approval process. A
 
person must not take
a “controlled
 
action” unless approval
 
is granted
 
under the
 
EPBC Act.
 
Any person
 
proposing to
 
carry out
 
an “action”
that may be
 
a “controlled action”
 
must refer the
 
matter to the
 
Commonwealth Minister
 
for a determination
 
as to
whether the proposed action is a controlled action.
On
 
November 2,
 
2016,
 
the
 
Commonwealth
 
Minister
 
for
 
the
 
Department
 
of
 
the
 
Environment
 
and
 
Energy
administering the
 
EPBC Act
 
approved the
 
extension of
 
the existing Curragh
 
mining area to
 
include mining
 
four
additional Tenements
 
—ML 700006,
 
ML 700007,
 
ML 700008
 
and ML 700009
 
(EPBC Act
 
referral 2015/7508)—
as
 
a
 
“controlled
 
action,”
 
on
 
certain
 
conditions.
 
The
 
conditions
 
include
 
requirements
 
in
 
relation
 
to
 
offsets
 
and
groundwater.
Mine Health and Safety
The primary health and safety legislation that applies
 
to Curragh are the Coal Mining Safety and
 
Health Act 1999
(Qld)
 
and
 
the
 
Coal
 
Mining
 
Safety
 
and
 
Health
 
Regulation 2001
 
(Qld),
 
which
 
we
 
refer
 
to,
 
together,
 
as the
 
Coal
Mining Safety Legislation.
Additional
 
legislative
 
requirements
 
apply
 
to
 
operations
 
that
 
are
 
carried
 
on
 
off-site
 
or
 
which
 
are
 
not
 
principally
related to
 
coal mining
 
(e.g., transport, rail
 
operations, etc.).
 
The Coal
 
Mining Safety
 
Legislation imposes
 
safety
and health
 
obligations on
 
persons who
 
operate coal
 
mines or
 
who may
 
affect
 
the safety
 
or health
 
of others
 
at
coal mines. Under the Coal Mining Safety Legislation, the operator
 
of a coal mine must, among other things:
•
 
ensure that the risk to coal mine workers while at the
 
operator’s mine is at an acceptable level;
•
 
audit and review the
 
effectiveness and
 
implementation of the
 
safety and health
 
management system to
ensure the risk to persons is at an acceptable level;
•
 
provide
 
adequate
 
resources
 
to
 
ensure
 
the
 
effectiveness
 
and
 
implementation
 
of
 
the
 
safety
 
and
 
health
management system;
•
 
ensure the
 
operator’s own
 
safety and
 
health and
 
the safety
 
and health
 
of others
 
is not
 
affected by
 
the
way the operator conducts coal mining operations;
•
 
not carry
 
out an
 
activity at
 
the coal
 
mine that
 
creates a
 
risk to
 
a person
 
on an
 
adjacent or
 
overlapping
petroleum authority if the risk is higher than an acceptable
 
level of risk;
•
 
appoint a site senior executive for the mine;
•
 
ensure the site senior
 
executive develops and
 
implements a safety
 
and health management
 
system for
all people at the mine;
•
 
ensure the
 
site senior
 
executive develops,
 
implements
 
and maintains
 
a management
 
structure for
 
the
mine that helps ensure the safety and health of persons
 
at the mine; and
•
 
not operate the coal mine without a safety and health
 
management system for the mine.
We recognize that health and
 
safety are imperative to the ongoing
 
success of our Australian Operations.
 
As the
operator at Curragh, we have
 
in place a comprehensive safety
 
and health management system,
 
which includes
an emergency
 
response
 
team,
 
to address
 
these legislative
 
requirements.
 
In accordance
 
with the
 
Coal Mining
Safety Legislation we have also established an occupational
 
hygiene baseline for dust exposure at Curragh.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
27
Water Act 2000 (Qld)
 
In Queensland, all entitlements to the use, control and
 
flow of water are vested in the state and regulated by
 
the
Water Act
 
2000 (Qld).
 
Allocations under
 
the Water
 
Act 2000 (Qld)
 
can be managed
 
by a water
 
supply scheme
operator,
 
such
 
as
 
SunWater Ltd,
 
which
 
is
 
a
 
Government-owned
 
corporation
 
regulated
 
by
 
the
 
Queensland
Competition Authority. We
 
have purchased the required water allocations for Curragh and entered into a suite of
related
 
channel
 
and
 
pipeline
 
infrastructure
 
agreements
 
and
 
river
 
supply
 
agreements
 
with
 
SunWater Ltd
 
to
regulate the
 
supply of water
 
pursuant to these
 
allocations. See Item 1A.
 
“Risk Factors—In times
 
of drought and/or
shortage of available water, our operations and production, particularly at Curragh, could be negatively impacted
if the regulators impose restrictions on our water offtake
 
licenses that are required for water used in the CPPs.”
National Greenhouse and Energy Reporting Act 2007
 
(Cth)
The National Greenhouse and Energy Reporting Act 2007 (Cth) imposes requirements for both foreign and local
corporations whose carbon dioxide production, greenhouse gas, or GHG, emissions and/or energy consumption
meets
 
a
 
certain
 
threshold
 
to
 
register
 
and
 
report
 
GHG
 
emissions
 
and
 
abatement
 
actions,
 
as
 
well
 
as
 
energy
production
 
and
 
consumption
 
as
 
part
 
of
 
a
 
single,
 
national
 
reporting
 
system.
 
The
 
Clean
 
Energy
 
Regulator
administers
 
the
 
National
 
Greenhouse
 
and
 
Energy
 
Reporting
 
Act
 
2007
 
(Cth),
 
and
 
the
 
Department
 
of
 
Climate
Change, Energy, the
 
Environment and Water is responsible
 
for related policy developments and review.
In accordance with Safeguard Mechanism under this
 
legislation, Curragh has been a assigned
 
a baseline for its
covered emissions
 
(Scope
 
1) and
 
we must
 
take steps
 
to keep
 
our emissions
 
at or
 
below the
 
baseline or
 
face
penalties.
 
The
 
Australian
 
federal
 
government
 
is
 
currently
 
reviewing
 
the
 
Safeguard
 
Mechanism
 
and
 
proposed
reforms are under public consultation.
Labor Relations
Minimum employment entitlements, embodied in the National Employment Standards, apply to all private-sector
employees
 
and
 
employers
 
in Australia
 
under
 
the federal
 
Fair Work
 
Act 2009
 
(Cth).
 
These standards
 
regulate
employment conditions and paid leave. Employees who are associated with the
 
day-to-day operations of a local
mine or mines and who are not located in head office or corporate administration offices are also covered by the
Black Coal Mining Industry Award 2010 which regulates conditions including termination arrangements; pay and
hours of work.
Unfair dismissal,
 
enterprise bargaining,
 
bullying claims,
 
industrial actions
 
and resolution
 
of workplace
 
disputes
are also regulated
 
under state
 
and federal
 
legislation. Some
 
of the workers
 
at Curragh
 
are covered
 
by the
 
EA,
which
 
was
 
approved
 
by
 
the
 
Fair
 
Work
 
Commission,
 
Australia’s
 
national
 
workplace
 
relations
 
tribunal.
 
See
 
“—
Human Capital Disclosures” above.
Regulatory Matters—United States
Federal,
 
state
 
and
 
local
 
authorities
 
regulate
 
the
 
U.S.
 
coal
 
mining
 
industry
 
with
 
respect
 
to
 
matters
 
such
 
as
employee
 
health
 
and
 
safety,
 
protection
 
of
 
the
 
environment,
 
permitting
 
and
 
licensing
 
requirements,
 
air
 
quality
standards, water pollution, plant and wildlife protection, the
 
reclamation and restoration of mining properties after
mining
 
has
 
been
 
completed,
 
the
 
discharge
 
of
 
materials
 
into
 
the
 
environment,
 
surface
 
subsidence
 
from
underground mining and the effects
 
of mining on groundwater quality
 
and availability.
 
In addition, the industry is
affected
 
by significant
 
requirements
 
mandating
 
certain
 
benefits for
 
current
 
and
 
retired
 
coal miners.
 
Numerous
federal,
 
state
 
and
 
local
 
governmental
 
permits
 
and
 
approvals
 
are
 
required
 
for
 
mining
 
operations.
 
Because
 
of
extensive and
 
comprehensive
 
regulatory
 
requirements,
 
violations during
 
mining
 
operations
 
occur from
 
time
 
to
time in the industry.
 
The summary below is a
 
non-exhaustive summary of material
 
legislation that applies to our
U.S. Operations. Although
 
this summary
 
focuses on federal
 
laws, most states
 
(including Virginia,
 
West Virginia
and Pennsylvania) have
 
their own regulatory
 
schemes that either
 
mirror federal laws
 
or create additional
 
layers
of regulation.
Clean Air Act of 1970
The U.S.
 
Clean Air
 
Act of
 
1970, or
 
the CAA,
 
regulates airborne
 
pollution that
 
may be
 
potentially detrimental
 
to
human
 
health,
 
the
 
environment
 
or
 
natural
 
resources.
 
The
 
CAA
 
and
 
comparable
 
state
 
laws
 
that
 
govern
 
air
emissions affect U.S. coal mining operations bo
 
th directly and indirectly.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
28
Direct impacts
 
on coal
 
mining and
 
processing operations
 
may occur
 
through the
 
CAA permitting
 
requirements
and/or
 
emission
 
control
 
requirements
 
relating
 
to
 
particulate
 
matter,
 
or
 
PM,
 
nitrogen
 
dioxide,
 
ozone
 
and
 
sulfur
dioxide,
 
or
 
SO
2
.
 
For
 
example,
 
the
 
U.S.
 
Environmental
 
Protection
 
Agency,
 
or
 
the
 
EPA,
 
pursuant
 
to
 
the
 
CAA,
administers
 
rules
 
that
 
apply
 
PM
 
emissions
 
limits
 
to
 
emissions
 
from
 
coal
 
preparation
 
and
 
processing
 
plants
constructed or
 
modified after
 
April 28, 2008.
 
In addition,
 
in recent
 
years, the
 
EPA
 
has adopted
 
more stringent
national ambient air quality standards, or
 
NAAQS for PM, nitrogen oxide, ozone
 
and SO
2
. It is possible
 
that these
modifications as well
 
as future modifications
 
to NAAQS could
 
directly or indirectly
 
impact our mining operations
in
 
a
 
manner
 
that
 
includes,
 
but
 
is
 
not
 
limited
 
to,
 
the
 
EPA
 
designating
 
new
 
areas
 
of
 
the
 
country
 
as
 
being
 
in
nonattainment of applicable
 
NAAQS or expanding
 
existing nonattainment
 
areas, and prompting
 
additional local
control measures
 
pursuant
 
to state
 
implementation
 
plans, or
 
SIPs, required
 
to address
 
such revised
 
NAAQS.
SIPs may be
 
state-specific or
 
regional in scope.
 
Under the CAA,
 
individual states
 
have up to 12
 
years from the
date of designation of attainment/nonattainment areas
 
to secure reductions from emission sources.
 
The CAA
 
also indirectly, but significantly, affects the
 
U.S. coal
 
industry by
 
extensively regulating the
 
SO2, nitrogen
oxides, mercury,
 
PM, greenhouse gases,
 
and other substances
 
emitted by coal-burning
 
facilities, such as
 
steel
manufacturers,
 
coke
 
ovens
 
and
 
coal
 
fired
 
electric
 
power
 
generating
 
facilities.
 
Over
 
time,
 
the
 
EPA
 
has
promulgated or proposed CAA
 
regulations to impose more
 
stringent air emission standards
 
for a number
 
of these
coal-burning industries, especially the power
 
generation sector.
 
While the EPA
 
under the Trump Administration
moved toward repealing or loosening
 
some of those regulations, the Biden
 
Administration has moved to restore
some regulations, such as those governing mercury emissions . This is particularly
 
the case for greenhouse gas
emissions from coal-fired electric generating facilities,
 
as President Biden has called for bringing the U.S.
 
power
sector to zero
 
greenhouse gas emissions
 
by 2035. However,
 
in 2022, the United
 
States Supreme Court
 
limited
the
 
ability
 
of
 
EPA
 
to
 
regulate
 
air
 
emissions
 
through
 
“beyond
 
the
 
fence
 
line”
 
regulations.
 
Collectively,
 
CAA
regulations and uncertainty
 
around future CAA
 
requirements could reduce
 
the demand for coal
 
and, depending
on the
 
extent of
 
such reduction,
 
could have
 
a material
 
adverse effect
 
on our
 
business, financial
 
condition and
operations.
NAAQS Revisions
.
 
The CAA
 
requires the
 
EPA
 
to periodically
 
review and,
 
if appropriate,
 
revise the
 
NAAQS to
ensure protection of
 
public health.
 
In recent years,
 
the EPA
 
has reviewed the
 
NAAQS for PM,
 
ozone and SO
2
.
 
The PM NAAQS
 
was last revised
 
and made more
 
stringent in 2012.
 
Individual states have developed
 
SIPs, which
detail the PM emission reductions their sources must meet in order for
 
the state to maintain or achieve the 2012
PM NAAQS. On
 
April 14,
 
2020, the EPA announced
 
its intention
 
to retain, without
 
changes, the 2012
 
PM NAAQS.
 
This
 
action
 
was
 
finalized
 
by
 
EPA
 
on
 
December
 
18,
 
2020.
 
On
 
June
 
10,
 
2021,
 
EPA
 
announced
 
that
 
it
 
would
reconsider this decision in light
 
of scientific evidence pointing
 
to health issues caused
 
by exposure to PM.
 
EPA
expects to issue a proposed rule with more stringent standards for PM in
 
Summer 2022 and a final rule in Spring
2023.
In
 
2015,
 
the
 
EPA
 
issued
 
a
 
final
 
rule
 
reducing
 
the
 
primary
 
ozone
 
NAAQS
 
from
 
75
 
to
 
70
 
parts
 
per
 
billion
 
but
retaining the existing secondary ozone
 
NAAQS. States with moderate or
 
high nonattainment areas must submit
SIPs for
 
the
 
2015
 
ozone
 
NAAQS
 
by October
 
2021.
 
Environmental
 
and
 
industry
 
groups challenged
 
the
 
2015
ozone NAAQS
 
in the
 
U.S. Court
 
of Appeals
 
for the
 
D.C. Circuit.
 
On August
 
23, 2019,
 
the court
 
denied all
 
the
petitions for
 
review against
 
the 2015 primary
 
NAAQS but
 
concluded that
 
the EPA
 
had not provided
 
a sufficient
rationale for
 
its decision
 
on the
 
2015 secondary
 
NAAQS and
 
remanded that
 
standard to
 
the EPA.
 
Prior to
 
the
court’s decision, EPA initiated another periodic review of the
 
ozone NAAQS.
 
This most recent review culminated
in a final
 
rule by the
 
EPA
 
on December
 
31, 2020 to
 
retain all aspects
 
of the 2015
 
ozone NAAQS, including
 
the
secondary
 
standard
 
with
 
additional
 
rationale
 
in
 
response
 
to
 
the
 
court’s
 
2019 decision.
 
It
 
remains
 
to
 
be
 
seen
whether there
 
will be
 
legal challenges
 
to the
 
December 2020
 
final rule,
 
or whether
 
the EPA
 
will reconsider
 
the
rule under the new administration. More stringent ozone or PM NAAQS, if promulgated, would require new
 
SIPs
to be
 
developed and
 
filed with
 
the EPA
 
and may
 
trigger additional
 
control technology
 
for mining
 
equipment
 
or
coal-burning facilities,
 
or result
 
in additional
 
challenges to
 
permitting and
 
expansion efforts.
 
This could
 
also be
the case
 
with
 
respect
 
to
 
the
 
implementation
 
of
 
any
 
new
 
requirements
 
triggered
 
by any
 
future,
 
more
 
stringent
NAAQS for nitrogen
 
oxide and SO
2
, although the
 
EPA
 
promulgated a final
 
rule on March
 
18, 2019 that
 
retains,
without revision, the existing NAAQS for SO
2
 
of 75 parts per billion average over an hour.
Cross State Air Pollution Rule, or CSAPR.
 
The CAA includes a so-called Good Neighbor
 
Provision that requires
upwind states to
 
eliminate their significant
 
contributions to
 
downwind states’
 
nonattainment of the
 
NAAQS. On
July 6, 2011,
 
the EPA
 
finalized the CSAPR,
 
which was
 
meant to satisfy
 
this Good Neighbor
 
Provision. CSAPR
requires the
 
District of
 
Columbia and
 
27 states
 
from Texas
 
eastward (not
 
including the
 
New England
 
states or
Delaware) to reduce power plant emissions that
 
cross state lines and significantly contribute to ozone
 
and/or fine
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
29
particle
 
pollution
 
in
 
downwind
 
states.
 
Following
 
litigation
 
in the
 
D.C. Circuit
 
and
 
U.S. Supreme
 
Court,
 
the first
phase of
 
the nitrogen
 
oxide and
 
SO2 emissions
 
reductions required
 
by CSAPR
 
commenced in
 
January 2015;
further reductions of both pollutants in the second phase
 
of CSAPR became effective in January 2017.
 
EPA
 
subsequently
 
published
 
the
 
CSAPR
 
Update
 
Rule
 
in
 
2016,
 
seeking
 
to
 
impose
 
nitrogen
 
oxide
 
emissions
reductions in
 
22 upwind
 
states subject
 
to CSAPR.
 
Subsequently,
 
in 2018,
 
EPA
 
published the
 
CSAPR Close-
Out, which found
 
that it would
 
not it would
 
not be feasible
 
to impose cost-effective
 
emissions on twenty
 
upwind
states before 2023,
 
which was two
 
years after
 
the CAA-mandated
 
2021 deadline
 
for states to
 
bring their
 
areas
of “severe”
 
nonattainment into
 
compliance with
 
the 2008
 
NAAQS.
 
Both the
 
CSAPR Update
 
Rule and
 
CSAPR
Close-Out
 
were
 
subject
 
to
 
legal
 
challenges
 
and
 
each
 
was
 
ultimately
 
vacated
 
by
 
the
 
United
 
States
 
Court
 
of
Appeals for the D.C. Circuit.
 
On March 15,
 
2021, EPA
 
finalized a rule
 
update that requires
 
additional emissions
 
reduction of nitrogen
 
oxides
from power plants in
 
twelve states.
 
Additional emission reduction
 
requirements in these
 
states could adversely
affect the demand for coal.
 
On April
 
30,
 
2021,
 
EPA
 
finalized
 
the
 
Revised
 
CSAPR
 
Update Rule,
 
which
 
fully
 
addressed
 
twenty-one
 
states’
outstanding interstate pollution transport obligations for the 2008 NAAQS for ozone.
 
For nine states, EPA found
that
 
their
 
projected
 
2021
 
emissions
 
do
 
not
 
significantly
 
contribute
 
to
 
non-attainment
 
and/or
 
maintenance
problems in downwind states.
 
The remaining twelve states
 
were found to
 
contribute to the non-attainment and/or
maintenance
 
problems
 
in
 
downwind
 
states.
 
EPA
 
indicated
 
that
 
it
 
would
 
issue
 
new
 
or
 
amended
 
Federal
Implementation Plans
 
requiring additional
 
emissions reductions
 
from electricity
 
generating units
 
in those states
beginning in the 2021 ozone season.
Mercury and Air
 
Toxic
 
Standards, or MATS.
 
The EPA
 
published the final
 
MATS
 
rule in the
 
Federal Register
 
on
February 16,
 
2012.
 
The
 
MATS
 
rule
 
revised
 
the
 
New
 
Source
 
Performance
 
Standards,
 
or
 
NSPS,
 
for
 
nitrogen
oxides,
 
SO2
 
and
 
PM
 
for
 
new
 
and
 
modified
 
coal-fueled
 
electricity
 
generating
 
plants,
 
and
 
imposed
 
Maximum
Achievable Control
 
Technology,
 
or MACT,
 
emission limits
 
on hazardous
 
air pollutants,
 
or HAPs,
 
from new
 
and
existing coal-fueled and oil-fueled electricity generating plants. MACT standards limit emissions of mercury,
 
acid
gas HAPs, non-mercury HAP
 
metals and organic
 
HAPs. The rule
 
provided three years
 
for compliance with
 
MACT
standards and
 
a possible
 
fourth year
 
if a
 
state permitting
 
agency determined
 
that such
 
was necessary
 
for the
installation of
 
controls. Although
 
the MATS
 
rule
 
has been
 
and continues
 
to be
 
the subject
 
of EPA
 
review
 
and
litigation, it remains
 
in effect and
 
has contributed to the
 
need for many coal-fired
 
power plants to install
 
addition
pollution controls, convert to natural gas, or retire.
Following issuance
 
of the
 
final MATS
 
rule, numerous
 
petitions for
 
review were
 
filed.
 
After proceedings
 
before
the U.S.
 
Court of Appeals
 
for the
 
D.C. Circuit,
 
the U.S. Supreme
 
Court on
 
June 29, 2015
 
held that
 
EPA interpreted
the CAA
 
unreasonably when
 
it deemed
 
cost irrelevant
 
to the
 
decision to
 
regulate HAPs
 
from new
 
and existing
coal-fueled
 
and
 
oil-fueled
 
power
 
plants.
 
The
 
Supreme
 
Court
 
remanded
 
the
 
case
 
to
 
the
 
D.C.
 
Circuit,
 
which
ultimately allowed
 
the rule
 
to remain
 
in effect
 
while EPA
 
promulgated a
 
series of
 
supplemental findings
 
on the
costs and benefits of the rule in response to the Supreme
 
Court’s ruling.
 
Most recently,
 
on May
 
22, 2020,
 
the EPA
 
finalized a
 
supplemental finding,
 
or Supplemental
 
Cost Finding,
 
that
health and environmental
 
benefits not directly
 
related to mercury
 
pollution should
 
not be included
 
in the benefit
portion of the analysis.
 
Using this framework EPA
 
found that the costs of the MATS
 
rule “grossly outweigh” any
possible
 
benefits
 
and,
 
therefore,
 
that
 
that
 
regulating
 
HAPs
 
from
 
coal-fired
 
and
 
oil-fired
 
power
 
plants
 
is
 
not
“appropriate and necessary” under
 
the CAA.
 
However, EPA determined that while it could revise
 
the cost-benefit
analysis for the MATS rule, it could not remove coal-fired plants from HAPs regulation.
 
The MATS rule therefore
remains
 
in
 
effect.
 
EPA
 
also
 
determined
 
in
 
the
 
Supplemental
 
Cost
 
Finding
 
that
 
the
 
MATS
 
rule
 
is
 
adequately
protective
 
of
 
public
 
health,
 
as
 
required
 
by
 
the
 
CAA’s
 
residual
 
risk
 
and
 
technology
 
review
 
provisions.
 
Westmoreland
 
Mining Holdings,
 
a coal
 
company,
 
filed a
 
petition with
 
the D.C.
 
Circuit in
 
May 2020
 
challenging
the
 
legality
 
of
 
the
 
MATS
 
rule.
 
Health
 
and
 
medical
 
groups
 
and
 
other
 
industry
 
groups
 
filed
 
a
 
petition
 
of
 
review
opposing the
 
Supplemental
 
Cost Finding,
 
and
 
its reversal
 
of the
 
previous
 
finding
 
that
 
it was
 
“appropriate
 
and
necessary”
 
to
 
regulate
 
HAPs.
 
Environmental
 
groups
 
also
 
challenge
 
the
 
EPA’s
 
residual
 
risk
 
and
 
technology
review of the MATS
 
rule, arguing that more
 
stringent standards are
 
necessary.
 
This litigation remains ongoing.
 
While the vast majority of coal-fired power
 
producers have already complied with the 2012 MATS rule standards,
any future reductions
 
in the
 
standards due
 
to the ongoing
 
litigation or
 
additional EPA
 
action could
 
increase the
cost of coal-fired electric power generation and negatively impact
 
the demand for coal.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
30
Clean Power Plan and Affordable Clean Energy, or ACE
. In 2014, the EPA proposed a sweeping rule, known as
the “Clean
 
Power
 
Plan,” to
 
cut carbon
 
emissions
 
from existing
 
electricity
 
generating
 
units,
 
including coal-fired
power plants. A final
 
version of the Clean
 
Power Plan was adopted in
 
August 2015. The Clean Power
 
Plan aimed
to
 
reduce
 
carbon
 
dioxide
 
emissions
 
from
 
electrical
 
power
 
generation
 
by
 
32%
 
by
 
2030
 
relative
 
to
 
2005
 
levels
through the reduction of
 
emissions from coal-burning
 
power plants and increased
 
use of renewable energy
 
and
energy conservation
 
methods.
 
Under the
 
Clean
 
Power
 
Plan, states
 
were free
 
to
 
reduce emissions
 
by various
means
 
and
 
were
 
to
 
submit
 
emissions
 
reduction
 
plans
 
to
 
the
 
EPA
 
by
 
September
 
2016
 
or,
 
with
 
an
 
approved
extension, September
 
2018. If
 
a state
 
had not
 
submitted a
 
plan by
 
then, the
 
Clean Power
 
Plan authorized
 
the
EPA to
 
impose its own
 
plan on that state.
 
In order to
 
determine a state’s
 
goal, the EPA
 
divided the country
 
into
three regions based on connected regional electricity grids.
 
States were to implement their plans by focusing
 
on
(i) increasing the generation efficiency
 
of existing fossil fuel plants, (ii) substituting
 
lower carbon dioxide emitting
natural gas generation
 
for coal-powered generation and
 
(iii) substituting generation from
 
new zero carbon
 
dioxide
emitting renewable sources for fossil fuel powered
 
generation. States were permitted to use
 
regionally available
low carbon generation sources when substituting for
 
in-state coal generation and to coordinate with
 
other states
to develop multi-state plans.
 
Following
 
adoption,
 
in
 
2015
 
twenty-seven
 
states
 
sued
 
the
 
EPA
 
in
 
the
 
D.C.
 
Circuit,
 
claiming
 
that
 
the
 
EPA
overstepped
 
its
 
legal
 
authority
 
in adopting
 
the
 
Clean
 
Power
 
Plan. In
 
February
 
2016, the
 
U.S.
 
Supreme
 
Court
ordered the EPA
 
to halt enforcement of the Clean
 
Power Plan until the lower court ruled on
 
the lawsuit and until
the Supreme Court determined whether or not to hear
 
the case.
 
In a parallel
 
litigation, twenty-five
 
states and other
 
parties filed lawsuits
 
challenging the
 
EPA’s
 
final NSPS rules
for carbon
 
dioxide emissions
 
from new,
 
modified, and
 
reconstructed
 
power plants
 
under the
 
CAA. One
 
of the
primary issues
 
in these
 
lawsuits was
 
the EPA’s establishment of standards
 
of performance based
 
on technologies
including carbon capture and sequestration, or CCS.
 
New coal plants could not meet the new standards unless
they implement
 
CCS.
 
In
 
conjunction
 
with
 
the
 
EPA’s
 
proposal
 
to
 
rescind
 
the
 
Clean
 
Power
 
Plan,
 
the
 
EPA
 
also
requested a stay of the NSPS litigation. The D.C. Circuit
 
granted the request.
 
In
 
October
 
2017,
 
the
 
EPA
 
commenced
 
rulemaking
 
proceedings
 
to
 
rescind
 
the
 
Clean
 
Power
 
Plan,
 
and
 
in
December
 
2017,
 
the
 
EPA
 
published
 
an
 
Advanced
 
Notice
 
of
 
Proposed
 
Rulemaking
 
announcing
 
its
 
intent
 
to
commence a
 
new rulemaking
 
to replace
 
the Clean
 
Power Plan
 
with an
 
alternative framework for
 
regulating carbon
dioxide. The rulemaking
 
would culminate
 
in the EPA
 
replacing the Clean
 
Power Plan with
 
ACE. On September
17, 2019,
 
the U.S.
 
Court of
 
Appeals for
 
the D.C.
 
Circuit dismissed
 
the Clean
 
Power
 
Plan litigation
 
and NSPS
litigation as moot in light of the ACE rule.
 
On June
 
19, 2019,
 
the EPA
 
finalized the
 
ACE rule
 
as a
 
replacement for
 
the Clean
 
Power Plan.
 
The ACE
 
rule
establishes emission guidelines
 
for states to develop
 
plans to address greenhouse
 
gas emissions from existing
coal-fired power plants.
 
The ACE rule
 
has several components:
 
a determination of
 
the best system
 
of emission
reduction for
 
greenhouse
 
gas emissions
 
from coal-fired
 
power plants,
 
a list
 
of “candidate
 
technologies”
 
states
can use when
 
developing their
 
plans, and new
 
implementing regulations
 
for emission guidelines
 
under Section
111(d)
 
of the CAA.
 
Unlike the
 
Clean Power
 
Plan, the
 
ACE rule
 
only includes
 
as candidate
 
technologies those
that increase the efficiency of individual emission units, also referred to as heat rate improvement measures; the
ACE
 
rule
 
does
 
not
 
include
 
other
 
methods
 
such
 
as
 
co-firing
 
with
 
natural
 
gas
 
or
 
adding
 
renewable
 
generation
facilities.
 
Upon
 
finalization
 
of
 
the
 
ACE
 
rule,
 
the
 
rule
 
was
 
subject
 
to
 
a
 
challenge
 
in
 
the
 
D.C.
 
Circuit
 
in
 
American
 
Lung
Association et al. v.
 
EPA, et
 
al.
 
On January 19, 2021,
 
the D.C. Circuit vacated
 
the ACE rule and remanded
 
the
question of
 
the “best
 
system of
 
emission reduction”
 
for carbon
 
dioxide emissions
 
from existing
 
power plants
 
to
EPA for further consideration.
 
In reaching its decision, the court found that ACE would not be the most effective
means of
 
reducing emissions,
 
and further
 
rejected the
 
idea that
 
EPA
 
is limited
 
under the
 
Clean Air
 
Act to
 
only
regulate emissions reductions at the
 
source.
 
On February 22, 2021, the
 
D.C. Circuit Court granted EPA’s motion
to stay issuance of the mandate to repeal until EPA
 
could respond
 
to the remand in a new rulemaking action.
 
In addition
 
to potential
 
CAA regulatory
 
changes, it
 
is possible
 
that other
 
future
 
international,
 
federal and
 
state
initiatives
 
to
 
control
 
greenhouse
 
gas
 
emissions
 
could
 
increase
 
costs
 
associated
 
with
 
coal
 
production
 
and
consumption,
 
such
 
as
 
costs
 
for
 
additional
 
controls
 
to
 
reduce
 
carbon
 
dioxide
 
emissions
 
or
 
costs
 
to
 
purchase
emissions reduction
 
credits to
 
comply with
 
future emissions
 
trading programs.
 
Future regulation
 
in the
 
United
States could
 
occur pursuant
 
to future
 
treaty commitments,
 
new domestic
 
legislation or
 
regulation
 
by the
 
EPA.
 
On
 
February
 
19,
 
2021,
 
the
 
United
 
States
 
rejoined
 
the
 
international
 
climate
 
agreement
 
reached
 
at
 
the
 
United
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
31
Nations Framework Convention on
 
Climate Change in Paris, France
 
during December 2015, also known
 
as the
Paris Agreement.
 
President Trump previously
 
withdrew the United States from
 
the Paris Agreement, beginning
a four-year
 
exit process.
 
In an
 
executive
 
order,
 
President
 
Biden directed
 
that
 
federal agencies
 
review recent
actions that
 
the President
 
believes
 
may interfere
 
with
 
the United
 
States’
 
participation
 
in the
 
Paris
 
Agreement.
 
While
 
the
 
Paris
 
Agreement
 
sets
 
only
 
voluntary
 
pledges
 
for
 
reducing
 
greenhouse
 
gas
 
emissions,
 
the
 
recent
executive actions signal
 
a shift
 
toward consideration of
 
new or more
 
stringent federal regulations
 
to further reduce
greenhouse gas emissions
 
in the United
 
States.
 
In addition, many
 
states, regions and
 
governmental bodies have
already
 
adopted
 
their
 
own
 
greenhouse
 
gas
 
emission
 
reduction
 
initiatives
 
and
 
have
 
or
 
are
 
considering
 
the
imposition of fees
 
or taxes based
 
on the such
 
emission by certain
 
facilities, including coal-fired electric
 
generating
facilities.
 
Others have announced their intent
 
to increase the use of renewable
 
energy sources, with the goal
 
of
displacing coal
 
and other
 
fossil fuels.
 
Federal legislation
 
along these
 
lines is
 
also a
 
possibility.
 
Depending on
the particular regulatory programs or new laws
 
enacted at the federal and state
 
levels, the demand for coal could
be negatively impacted, which would have an adverse effect
 
on our operations.
There have
 
also been
 
numerous challenges
 
to the
 
permitting of
 
new coal-fired
 
power plants
 
by environmental
organizations and state
 
regulators for concerns related
 
to greenhouse gas
 
emissions.
 
For instance, various
 
state
regulatory authorities
 
have rejected
 
the construction
 
of new
 
coal-fueled power
 
plants based
 
on the
 
uncertainty
surrounding the potential
 
costs associated with
 
greenhouse gas emissions
 
under future laws.
 
In addition, several
permits issued to
 
new coal-fueled power
 
plants without greenhouse
 
gas emission limits
 
have been appealed
 
to
the EPA's
 
Environmental
 
Appeals Board.
 
A federal
 
appeals court
 
allowed a
 
lawsuit pursuing
 
federal common
law claims to proceed
 
against certain utilities
 
on the basis
 
that they may
 
have created a
 
public nuisance due
 
to
their emissions of
 
carbon dioxide, while
 
a second federal
 
appeals court dismissed
 
a similar case
 
on procedural
grounds.
 
The United States Supreme Court overturned that decision in June 2011, holding that federal common
law
 
provides
 
no
 
basis
 
for
 
public
 
nuisance
 
claims
 
against
 
utilities
 
due
 
to
 
their
 
carbon
 
dioxide
 
emissions.
 
The
United
 
States
 
Supreme
 
Court
 
did
 
not,
 
however,
 
decide
 
whether
 
similar
 
claims
 
can
 
be
 
brought
 
under
 
state
common law.
 
As a result, tort-type
 
liabilities remain a concern.
 
To
 
the extent that these
 
risks affect our
 
current
and prospective customers,
 
they may reduce the demand
 
for coal-fired power, and may affect long-term demand
for coal.
Regional Haze.
 
The EPA
 
promulgated a regional
 
haze program designed
 
to protect and
 
to improve visibility
 
at
and around Class I Areas, which are generally national parks, national wilderness areas and international parks.
This program
 
may restrict
 
the construction
 
of
 
new
 
coal-fired
 
power
 
plants,
 
the
 
operation
 
of
 
which
 
may
 
impair
visibility
 
at
 
and
 
around
 
the
 
Class
 
I
 
Areas.
 
Additionally,
 
the
 
program
 
requires
 
certain
 
existing
 
coal-fired
 
power
plants
 
to install
 
additional
 
control measures
 
designed
 
to limit
 
haze-causing
 
emissions,
 
such
 
as SO2,
 
nitrogen
oxide and
 
PM. States
 
were required
 
to submit
 
Regional Haze
 
SIPs to
 
the EPA
 
in 2007;
 
however,
 
many states
did
 
not
 
meet
 
that
 
deadline.
 
In
 
2016,
 
the
 
EPA
 
finalized
 
revisions
 
to
 
the
 
Regional
 
Haze
 
Rule
 
which
 
addresses
requirements for the
 
second planning
 
period. In
 
September 2019, the
 
EPA
 
issued final regional
 
haze guidance
that
 
indicates
 
that
 
a
 
re-evaluation
 
of
 
sources
 
already
 
subject
 
to
 
best
 
available
 
retrofit
 
technologies
 
is
 
likely
unnecessary. The guidance also encourages states to
 
balance visibility benefits against
 
other factors in selecting
the
 
measures
 
necessary
 
to
 
make
 
“reasonable
 
progress”
 
toward
 
natural
 
visibility
 
conditions.
 
Finally,
 
when
comparing
 
various
 
control
 
options
 
to
 
determine
 
which
 
ones
 
may
 
be
 
“cost-effective”,
 
the
 
final
 
guidance
recommends comparing cost to
 
visibility benefits. SIPs were
 
required by July 31,
 
2021.
 
On August 30, 2022
 
EPA
issued a final action finding
 
that 15 states had failed
 
to meet the July 31,
 
2021 deadline.
 
Such failure triggers a
two
 
year
 
deadline
 
for
 
EPA
 
to
 
promulgate
 
a
 
Federal
 
Implementation
 
Plan
 
unless
 
the
 
states
 
submits
 
and
 
EPA
approves a SIP that
 
meets the applicable requirements.
 
If states adopt SIPs
 
with more stringent requirements,
demand for coal could be affected.
New Source
 
Review,
 
or NSR
. Pursuant
 
to NSR
 
regulations,
 
stationary sources
 
of air
 
pollution must
 
obtain an
NSR permit prior to beginning
 
construction of a new
 
“major” source of emissions
 
or a “major” modification
 
of an
existing major source.
 
If a project
 
is determined to
 
trigger NSR, Prevention
 
of Significant Deterioration
 
regulations
require the project to implement Best
 
Available Control Technology
 
and/or Non-Attainment New Source Review
Lowest Achievable Emission Rate control technology.
Beginning in the late 1990s, the EPA filed lawsuits against owners of many
 
coal-fired power plants in the eastern
U.S. alleging that
 
the owners performed
 
non-routine maintenance, causing increased emissions
 
that should have
triggered
 
the
 
application
 
of
 
these NSR
 
standards.
 
Some of
 
these
 
lawsuits
 
have
 
been settled
 
with
 
the
 
owners
agreeing to install additional emission control devices in
 
their coal-fired power plants.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
32
The remaining litigation and uncertainty around the NSR program rules could impact
 
demand for coal.
 
In recent
years,
 
EPA
 
proposed
 
and
 
promulgated
 
several
 
revisions
 
to its
 
NSR
 
regulations
 
and policies
 
concerning
 
NSR
permitting.
 
For example,
 
one such
 
change, known
 
as the
 
Project Emissions
 
Accounting Rule
 
on October
 
22,
2020, revises the NSR
 
regulations to clarify that recent
 
emission decreases can be considered
 
in part of the
 
NSR
applicability test.
 
In addition, the EPA on November 14, 2018 issued a final
 
rule that clarified the appropriate test
for determining
 
whether two nominally
 
separate modifications to
 
existing facilities
 
should be
 
considered in
 
a single
NSR applicability analysis.
 
While these changes have
 
the potential to reduce
 
NSR permitting burdens for
 
coal-
fired power plants and other coal-burning
 
facilities, the Biden Administration has reversed some policies adopted
by the Trump Administration and may seek
 
to tighten NSR regulations and guidance.
Coke Ovens.
 
Coke Oven
 
Batteries and
 
Coke Ovens:
 
Pushing, Quenching,
 
and Battery
 
Stacks are
 
two source
categories
 
regulated
 
by
 
the
 
CAA.
 
The
 
initial
 
technology-based
 
standards
 
for
 
Coke
 
Oven
 
Batteries
 
were
promulgated
 
by
 
EPA
 
in
 
1993.
 
In
 
2003,
 
EPA
 
issued
 
technology-based
 
standards
 
for
 
Coke
 
Ovens:
 
Pushing,
Quenching,
 
and Battery
 
Stacks.
 
In 2005,
 
EPA
 
revised
 
the technology
 
-based standards
 
and issued
 
risk-based
standards following
 
a residual
 
risk review.
 
On June
 
26, 2020,
 
the United
 
States District
 
Court for
 
the Northern
District
 
of
 
California
 
found
 
EPA
 
had
 
violated
 
its
 
statutory
 
duty
 
to
 
perform
 
a
 
technology
 
review
 
of
 
its
 
initial
technology-based standards for Coke Ovens:
 
Pushing, Quenching, and Battery Stacks and
 
a residual risk review
of those
 
standards. The court
 
also found
 
that EPA had violated
 
its statutory
 
duty to
 
conduct a
 
follow-up technology
review and second
 
residual risk
 
review of the
 
standards for
 
Coke Oven
 
Batteries. The court
 
held that
 
EPA
 
has
30 months
 
to comply
 
with its
 
statutory duty
 
for these
 
two source
 
categories. To
 
the extent
 
that EPA
 
ultimately
promulgates more stringent technology-based standards as
 
a result of
 
the court-ordered technology and residual
risk reviews, it could affect our current and prospective
 
customers and may affect long-term demand
 
for coal.
On January 21,
 
2021, President Biden issued
 
an executive order
 
that ordered the
 
review of certain
 
environmental
regulations promulgat
 
ed under
 
the Trump
 
administration.
 
Those environmental
 
regulations
 
include ozone
 
and
particulate matter NAAQS, the ACE rule,
 
and other air emission rules potentially
 
affecting coal-fired power plants
and other coal-burning facilities. It is unclear what affect
 
this order will have on the demand for coal.
Clean Water Act of 1972
The U.S. Clean Water Act of 1972, or the CWA,
 
and corresponding state law governs the discharge of toxic and
non-toxic pollutants into the waters of the United States. CWA requirements
 
may directly or indirectly affect U.S.
coal mining operations.
Water Discharge.
 
The CWA and corresponding state laws affect coal mining operations by imposing restrictions
on discharges
 
of wastewater into
 
waters of
 
the United
 
States through the
 
National Pollutant Discharge
 
Elimination
System,
 
or
 
NPDES,
 
or
 
an
 
equally
 
stringent
 
program
 
delegated
 
to
 
a
 
state
 
agency.
 
The
 
EPA
 
and
 
states
 
may
develop
 
standards
 
and
 
limitations
 
for
 
certain
 
pollutants,
 
including
 
through
 
the
 
technology-based
 
standard
program and water quality
 
standard program. These restrictions often
 
require us to pre-treat
 
the wastewater prior
to discharging
 
it. NPDES
 
permits require
 
regular monitoring,
 
reporting and
 
compliance with
 
effluent limitations.
New requirements
 
under
 
the
 
CWA
 
and
 
corresponding
 
state
 
laws
 
may
 
cause
 
us
 
to
 
incur
 
significant
 
additional
costs that could adversely affect our
 
operating results.
Dredge and Fill Permits.
 
Many mining activities, such as the development
 
of refuse impoundments, fresh water
impoundments,
 
refuse fills,
 
and other
 
similar structures,
 
may result
 
in
 
impacts
 
to
 
waters
 
of the
 
United
 
States,
including wetlands, streams
 
and, in certain
 
instances, man-made conveyances that
 
have a hydrologic
 
connection
to such streams
 
or wetlands. Under
 
the CWA,
 
coal companies are
 
also required to
 
obtain a Section
 
404 permit
from
 
the
 
USACE
 
prior
 
to
 
conducting
 
certain
 
mining
 
activities,
 
such
 
as
 
the
 
development
 
of
 
refuse
 
and
 
slurry
impoundments, fresh water impoundments,
 
refuse fills and other similar
 
structures that may affect
 
waters of the
United
 
States,
 
including
 
wetlands,
 
streams
 
and,
 
in
 
certain
 
instances,
 
man-made
 
conveyances
 
that
 
have
 
a
hydrologic connection
 
to streams
 
or wetlands.
 
The USACE
 
is authorized
 
to issue
 
general “nationwide”
 
permits
for specific
 
categories of
 
activities
 
that are
 
similar in
 
nature and
 
that are
 
determined
 
to have
 
minimal adverse
effects on
 
the environment.
 
Permits issued
 
pursuant to
 
Nationwide Permit
 
21, or
 
NWP 21,
 
generally authorize
the
 
disposal
 
of
 
dredged
 
and
 
fill
 
material
 
from
 
surface
 
coal
 
mining
 
activities
 
into
 
waters
 
of
 
the
 
United
 
States,
subject to certain restrictions. Since
 
March 2007, permits under
 
NWP 21 were reissued
 
for a five-year period
 
with
new
 
provisions
 
intended
 
to
 
strengthen
 
environmental
 
protections.
 
There
 
must
 
be
 
appropriate
 
mitigation
 
in
accordance
 
with
 
nationwide
 
general
 
permit
 
conditions
 
rather
 
than
 
less
 
restricted
 
state-required
 
mitigation
requirements,
 
and
 
permit
 
holders
 
must
 
receive
 
explicit
 
authorization
 
from
 
the
 
USACE
 
before
 
proceeding
 
with
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
33
proposed mining activities. The USACE may also issue individual permits
 
for mining activities that do not qualify
for Nationwide Permit 21.
The CWR/Navigable Waters
 
Protection, or NWPR.
 
Recent regulatory actions
 
and court decisions
 
have created
some
 
uncertainty
 
over
 
the
 
scope
 
of
 
CWA
 
jurisdiction.
 
On
 
June
 
29,
 
2015,
 
the
 
EPA
 
and
 
the
 
USACE
 
jointly
promulgated final rules, collectively known as the Clean Water Rule, or the CWR, redefining the scope of waters
protected
 
under
 
the
 
CWA,
 
revising
 
regulations
 
that
 
had
 
been
 
in
 
place
 
for
 
more
 
than
 
25
 
years.
 
These
 
rules
expanded
 
the
 
scope
 
of
 
CWA
 
jurisdiction,
 
making
 
discharges
 
into
 
more
 
bodies
 
of water
 
subject
 
to
 
the
 
CWA’s
permitting and
 
other requirements.
 
Following the
 
CWR’s promulgation,
 
numerous industry
 
groups, states,
 
and
environmental groups challenged
 
the CWR. On October
 
9, 2015, the U.S. Court
 
of Appeals for the
 
Sixth Circuit
stayed the
 
CWR’s
 
implementation
 
nationwide,
 
pending further
 
action
 
in court.
 
Further,
 
on February
 
28, 2017,
President Trump signed an executive order directing the relevant executive agencies to review
 
the CWR, and on
July 27,
 
2017, the
 
EPA
 
and the
 
USACE published
 
a proposed
 
rule to rescind
 
the CWR.
 
On January
 
22, 2018,
the Supreme Court reversed the Sixth Circuit’s decision, ruling that
 
jurisdiction over challenges to the CWR rests
with the federal district courts and not with the appellate courts, which was followed by the dissolution
 
of the stay
by the Sixth Circuit, and
 
on February 6, 2018, in
 
response to the January 2018 Supreme
 
Court decision, the EPA
and USACE published
 
a final rule
 
to postpone the
 
adoption of CWR
 
and maintain
 
the status quo
 
(the pre 2015
rule)
 
through
 
February
 
6,
 
2020
 
pending
 
the
 
agencies’
 
review
 
of
 
the
 
CWR.
 
Multiple
 
states
 
and
 
environmental
groups have filed challenges to this
 
delay. On
 
August 16, 2018, the federal court
 
in South Carolina enjoined the
February 6, 2018 rule, effectively reinstating
 
the CWR in Virginia and
 
Pennsylvania (where we have operations)
and in 24 other states.
On April
 
21, 2020,
 
the EPA
 
and the
 
USACE published
 
the Navigable
 
Waters
 
Protection Rules,
 
or the
 
NWPR.
The
 
NWPR
 
revises
 
the
 
definition
 
of
 
waters
 
of
 
the
 
United
 
States,
 
replacing
 
the
 
CWR.
 
The
 
NWPR
 
shrinks
 
the
agencies’ jurisdiction, particularly
 
as it relates to tributaries
 
and adjacent waters. The
 
NWPR went into effect
 
on
June 22, 2020.
 
The NWPR was
 
enjoined in Colorado,
 
but this decision
 
was overturned by
 
the Tenth Circuit Court
of Appeals. On January 18, 2023,
 
the EPA and the USACE published a final rule redefining “waters of
 
the United
States.” The new
 
definition reflects
 
certain aspects
 
of the pre-2015
 
definition as well
 
as consideration
 
of recent
Supreme Court decisions.
 
It enlarges the agencies’ jurisdiction over waters as compared
 
to the NWPR.
On April 22, 2020, in an unrelated
 
case the Supreme Court ruled that provisions
 
of the CWA require an NPDES
permit when
 
there is
 
a direct
 
discharge from
 
a point
 
source to
 
navigable
 
waters
 
or the
 
functionally
 
equivalent
discharge to groundwater.
 
The NWPR, however,
 
had excluded groundwater
 
from the agencies’
 
jurisdiction. On
January
 
21,
 
2021,
 
EPA
 
issued
 
guidance
 
applying
 
the
 
ruling
 
of
 
the
 
Supreme
 
Court
 
to
 
the
 
NPDES
 
permitting
program.
 
Under the
 
Biden
 
Administration, the
 
EPA
 
rescinded
 
this guidance
 
memorandum,
 
thus eliminating
 
a
new factor that likely would have reduced clean water
 
protections.
 
On
 
January
 
24,
 
2022,
 
the
 
United
 
States
 
Supreme
 
Court
 
agreed
 
to
 
hear
 
a
 
case
 
that
 
could
 
undermine
 
key
provisions of the January 18, 2023 final rule.
 
A decision is expected by June 2023.
 
Litigation of the definition of
waters of
 
the United
 
States is
 
likely to
 
continue.
 
Uncertainty surrounding
 
the definition
 
of waters
 
of the
 
United
States remains, including what impact it may have on our operations.
Effluent Limitations
 
Guidelines for
 
the Steam
 
Electric Power
 
Generating Industry.
 
On September
 
30, 2015,
 
the
EPA published a
 
final rule setting new or additional requirements for
 
various wastewater discharges from steam
electric power plants.
 
The rule set
 
zero discharge
 
requirements for
 
some waste streams,
 
as well as
 
new, more
stringent limits
 
for arsenic,
 
mercury,
 
selenium and
 
nitrogen applicable
 
to certain
 
other waste
 
streams. On
 
April
12, 2019, the U.S. Court of
 
Appeals for the Fifth Circuit agreed with
 
environmental groups that the portions of the
rule regulating legacy wastewater
 
and residual combustion leachate
 
are unlawful and vacated
 
those portions of
the rule.
 
On August 31, 2020, the EPA finalized a rule to revise the guidelines and standards for the steam electric power
generating point source category applicable to two categories of wastewater streams regulated by
 
the 2015 rule:
flue
 
gas
 
desulfurization
 
wastewater,
 
or
 
FGD,
 
and
 
bottom
 
ash
 
transport
 
water,
 
or
 
BA.
 
With
 
respect
 
to
 
FGD,
selenium standards are
 
less stringent than
 
under the 2015
 
rule, and certain
 
types of facilities,
 
such as facilities
with
 
high
 
FGD
 
flow,
 
low
 
utilization
 
boilers
 
and
 
those
 
set
 
to
 
retire
 
coal
 
combustion
 
units,
 
are
 
subject
 
to
 
less
stringent
 
effluent
 
limits.
 
The
 
compliance
 
deadline
 
for
 
FGD
 
technology-based
 
wastewater
 
limits
 
was
 
extended
from December 31, 2023 to December 31, 2025. With respect to
 
BA, the EPA, among other
 
things, eliminated a
strict no-discharge
 
requirement and
 
implemented a
 
not-to-exceed ten-percent
 
volumetric purge.
 
We cannot
 
at
this time predict how this rule will be enforced by the new
 
Biden administration or if it will seek a revision.
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
34
The Biden
 
Administration’s
 
January 20, 2021
 
executive order
 
for review
 
of environmental
 
regulations indicated
the Biden Administration would review the NWPR amongst other
 
CWA-related regulations.
 
Surface Mining Control and Reclamation Act of 1977
The
 
Surface
 
Mining
 
Control
 
and
 
Reclamation
 
Act of
 
1977,
 
or the
 
SMCRA,
 
which
 
is administered
 
by the
 
U.S.
Office
 
of
 
Surface
 
Mining
 
Reclamation
 
and
 
Enforcement,
 
or
 
OSM,
 
establishes
 
operational,
 
reclamation
 
and
closure standards for
 
all aspects of
 
surface mining and
 
many aspects of
 
underground mining in
 
the United States.
Unlike the
 
CAA and
 
the CWA,
 
SMCRA is
 
primarily concerned
 
with the
 
holistic regulation
 
of coal
 
mining as
 
an
industry.
 
Its general environmental standards
 
require surface operations
 
to mine in such a
 
way as to “maximize
the
 
utilization
 
and
 
conservation”
 
of
 
coal
 
while
 
using
 
the
 
best
 
technology
 
currently
 
available
 
to
 
minimize
 
land
disturbance
 
and
 
adverse
 
impacts
 
on
 
wildlife,
 
fish,
 
and
 
environmental
 
values.
 
SMCRA
 
requires
 
operators
 
to
accomplish these goals by restoring the land to its approximate
 
pre-mining condition and contour.
The
 
SMCRA
 
implements
 
its
 
environmental
 
standards
 
through
 
“cooperative
 
federalism.”
 
Under
 
the
 
SMCRA,
 
a
state
 
may
 
submit
 
a
 
qualifying
 
surface
 
mining
 
regulatory
 
scheme
 
to
 
the
 
OSM,
 
and
 
request
 
to
 
exert
 
exclusive
jurisdiction over surface mining activities
 
within its territory. If OSM finds that the
 
state’s scheme meets SMCRA’s
requirements and gives
 
approval, the state
 
becomes the primary
 
regulatory authority
 
with oversight from
 
OSM.
If a state has a surface
 
mining regulatory scheme that
 
is less stringent than the surface
 
mining standards under
SMCRA and OSM regulations, or if mining
 
on federal lands is involved, the OSM
 
will impose federal regulations
on surface mining
 
in that state. Each
 
of Virginia, West
 
Virginia and Pennsylvania,
 
where our Buchanan,
 
Logan,
Greenbrier and Mon Valley operations are
 
based, has adopted qualifying
 
surface mining regulatory schemes and
has primary jurisdiction
 
over surface mining
 
activities within their
 
respective territories. However,
 
even if a state
gains approval for its surface mining regulatory program, the OSM retains significant federal oversight, including
the ability
 
to perform
 
inspections of
 
all surface
 
mining sites
 
to ensure
 
state program and
 
mine operator
 
compliance
with federal minimum standards. The OSM and its state counterparts
 
also oversee and evaluate standards of:
•
 
performance (both during operations and during reclamation);
•
 
permitting
 
(applications
 
must
 
describe
 
the
 
pre-mining
 
environmental
 
conditions
 
and
 
land
 
use,
 
the
intended mining and reclamation standards, and the post-mining
 
use);
•
 
financial assurance (SMCRA
 
requires that mining companies
 
post a bond sufficient
 
to cover the cost
 
of
reclaiming the site,
 
and the
 
bond is not
 
released until
 
mining is
 
complete, the
 
land has
 
been reclaimed
and the OSM has approved the release);
•
 
inspection and enforcement (including the issuance of notices of violation and the placement of a
 
mining
operation,
 
its
 
owners
 
and
 
controllers
 
on
 
a
 
federal
 
database
 
known
 
as
 
the
 
Applicant
 
Violator
 
System,
meaning that such person or entity is blocked from obtaining
 
future mining permits); and
•
 
land restrictions (SMCRA prohibits surface mining on certain lands and also allows
 
citizens to challenge
surface mining operations on the grounds that they will cause
 
a negative environmental impact).
Regulations under
 
the SMCRA
 
and its
 
state analogues
 
provide that a
 
mining permit
 
or modification
 
can, under
certain circumstances,
 
be delayed,
 
refused or
 
revoked if
 
we or
 
any entity
 
that owns
 
or controls
 
us or
 
is under
common
 
ownership
 
or
 
control
 
with
 
us
 
have
 
unabated
 
permit
 
violations
 
or
 
have
 
been
 
the
 
subject
 
of
 
permit
 
or
reclamation bond revocation or suspension.
Under the SMCRA
 
and its state
 
law counterparts, all
 
coal mining applications must
 
include mandatory “ownership
and control” information,
 
which generally includes
 
listing the names of
 
the operator’s officers
 
and directors, and
its principal
 
stockholders owning
 
10% or
 
more of
 
its voting
 
shares, among
 
others. Ownership
 
and control
 
reporting
requirements are
 
designed to
 
allow regulatory
 
review of
 
any entities
 
or persons
 
deemed to
 
have ownership
 
or
control of
 
a coal
 
mine, and
 
bar the
 
granting of
 
a coal
 
mining permit
 
to any
 
such entity
 
or person (including
 
any
“owner and controller”) who has
 
had a mining permit
 
revoked or suspended, or
 
a bond or similar
 
security forfeited
within the five-year period preceding a permit application or application for
 
a permit revision. Similarly, regulatory
agencies also
 
block the
 
issuance of
 
permits to
 
applicants, their
 
owners or
 
their controlling
 
persons, who
 
have
outstanding permit violations that have not been timely
 
abated.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
35
These
 
regulations
 
define
 
certain
 
relationships,
 
such
 
as
 
owning
 
over
 
50%
 
of
 
stock
 
in
 
an
 
entity
 
or
 
having
 
the
authority to determine the manner in which the entity conducts mining operations, as constituting ownership
 
and
control. Certain other relationships are presumed to constitute ownership or control, including among others, the
following:
•
 
being an officer or director of an entity;
•
 
being the operator of the coal mining operation;
•
 
having the ability to commit the financial or real property assets or working resources of the permittee or
operator; and
•
 
owning of record 10% or more of the mining operator.
This presumption, in some cases, can be
 
rebutted where the person or entity can demonstrate
 
that it in fact does
not
 
or
 
did
 
not
 
have
 
authority
 
directly
 
or
 
indirectly
 
to
 
determine
 
the
 
manner
 
in
 
which
 
the
 
relevant
 
coal
 
mining
operation is conducted.
We must file an ownership and control notice each time an entity obtains a 10% or greater interest in us. If we or
entities or persons
 
deemed to
 
have ownership
 
of control
 
of us have
 
unabated violations
 
of SMCRA
 
or its state
law counterparts,
 
have a
 
coal mining
 
permit suspended
 
or revoked,
 
or forfeit
 
a reclamation
 
bond, we
 
and our
owners and
 
controllers may
 
be prohibited
 
from obtaining
 
new coal
 
mining permits,
 
or amendments
 
to existing
permits, until such
 
violations or other
 
matters are corrected.
 
This is known
 
as being “permit-blocked.”
 
Additionally,
if
 
an
 
owner
 
or
 
controller
 
of
 
us
 
is
 
deemed
 
an
 
owner
 
or
 
controller
 
of
 
other
 
mining
 
companies,
 
we
 
could
 
be
permit-blocked
 
based
 
upon the
 
violations
 
of, or
 
permit-blocked
 
status
 
of, an
 
owner
 
or controller
 
of such
 
other
mining
 
companies.
 
If
 
our
 
owner
 
or
 
controller
 
were
 
to
 
become
 
permit
 
blocked,
 
this
 
could
 
adversely
 
affect
production from our properties.
In recent years, the
 
permitting required for
 
coal mining has been
 
the subject of increasingly
 
stringent regulatory
and administrative
 
requirements
 
and extensive
 
activism and
 
litigation by
 
environmental
 
groups.
 
After a
 
permit
application is
 
prepared and
 
submitted to
 
the regulatory
 
agency,
 
it goes
 
through a
 
completeness and
 
technical
review.
 
Public
 
notice
 
of
 
the
 
proposed
 
permit
 
is
 
given
 
for
 
a
 
comment
 
period
 
before
 
a
 
permit
 
can
 
be
 
issued.
Regulatory authorities
 
have considerable
 
discretion in
 
the timing
 
of the
 
permit issuance
 
and the
 
public has
 
the
right
 
to
 
comment
 
on
 
and
 
otherwise
 
engage
 
in
 
the
 
permitting
 
process,
 
including
 
public
 
hearings
 
and
 
through
intervention
 
in
 
the
 
courts.
 
Monetary
 
sanctions
 
and,
 
in
 
certain
 
circumstances,
 
even
 
criminal
 
sanctions
 
may
 
be
imposed for failure to comply with the SMCRA permits. Before a SMCRA permit is issued, a mine operator
 
must
submit
 
a
 
bond
 
or
 
other
 
form
 
of
 
financial
 
security
 
to
 
guarantee
 
the
 
performance
 
of
 
reclamation
 
bonding
requirements.
SMCRA provides for three
 
categories of bonds: surety
 
bonds, collateral bonds and
 
self-bonds. A surety bond
 
is
an
 
indemnity
 
agreement
 
in
 
a
 
sum
 
certain
 
payable
 
to
 
the
 
regulatory
 
authority,
 
executed
 
by
 
the
 
permittee
 
as
principal and
 
which
 
is supported
 
by the
 
performance
 
guarantee of
 
a surety
 
corporation.
 
A collateral
 
bond can
take
 
several
 
forms,
 
including
 
cash,
 
letters
 
of
 
credit,
 
first
 
lien
 
security
 
interest
 
in
 
property
 
or
 
other
 
qualifying
investment securities.
 
A self-bond
 
is an indemnity
 
agreement in
 
a sum
 
certain executed
 
by the permittee
 
or by
the permittee
 
and any
 
corporate guarantor
 
made payable
 
to the
 
regulatory authority.
 
For our
 
U.S. Operations,
we meet our reclamation bonding requirements by posting surety
 
bonds and participation in the Commonwealth
of Virginia bond pool. Our total amount of reclamation surety bonds outstanding was approximately $28.5
million
as of December 31, 2022. The surety
 
bond requirements for a mine represent the
 
calculated cost to reclaim the
current operations if it ceased to operate in the
 
current period. The cost calculation for each surety bond must be
completed according to the regulatory authority of each
 
state.
The SMCRA Abandoned Mine Land Fund requires
 
a fee on all coal
 
produced in the United States. The proceeds
are used to rehabilitate
 
lands mined and left
 
unreclaimed prior to August
 
3, 1977 and to pay
 
health care benefit
costs of
 
orphan beneficiaries
 
of the Combined
 
Fund created
 
by the
 
Coal Industry
 
Retiree Health
 
Benefit Act
 
of
1992. The fee
 
amount can change
 
periodically based on
 
changes in federal
 
legislation. Pursuant to
 
the Tax Relief
and Health Care Act of 2006, from October 1, 2012 through September 30, 2021, the fee is $0.31 and $0.13 per
Mt of
 
surface-mined and underground-mined
 
coal, respectively. See Item 2.
 
“Properties” for information
 
regarding
reclamation and other taxes applicable to our U.S. mining
 
properties.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
36
While SMCRA is
 
a comprehensive statute,
 
SMCRA does not
 
supersede the need
 
for compliance with
 
other major
environmental statutes,
 
including the
 
Endangered Species
 
Act of
 
1973, or
 
the ESA,
 
CAA, CWA,
 
the Resource
Conservation
 
and
 
Recovery
 
Act
 
of
 
1976,
 
or
 
the
 
RCRA,
 
and
 
the
 
Comprehensive
 
Environmental
 
Response,
Compensation, and Liability Act of 1980, or CERCLA.
National Environmental Policy Act of 1969
The National Environmental Policy
 
Act of 1969,
 
or NEPA, applies to mining
 
operations or permitting requirements
that require federal approvals,
 
NEPA requires federal agencies to evaluate the
 
environmental impact of all
 
“major
federal actions”
 
significantly
 
affecting
 
the
 
quality
 
of the
 
human environment.
 
NEPA
 
requires
 
federal
 
agencies,
such as the EPA or the OSM,
 
to incorporate environmental considerations in their
 
planning and decision-making.
The federal
 
agency
 
carrying
 
out
 
the
 
requirements
 
of
 
NEPA
 
must
 
prepare
 
a
 
detailed
 
statement
 
assessing
 
the
environmental impact
 
of and
 
alternatives to
 
the particular
 
action requiring
 
agency approval.
 
These statements
are
 
referred
 
to
 
as
 
Environmental
 
Impact
 
Statements
 
or
 
Environmental
 
Assessments.
 
NEPA
 
also
 
defines
 
the
processes for evaluating
 
and communicating environmental
 
consequences of federal
 
decisions and actions,
 
such
as
 
the
 
permitting
 
of
 
new
 
mine
 
development
 
on
 
federal
 
lands.
 
U.S.
 
coal
 
mining
 
companies
 
must
 
provide
information
 
to
 
agencies
 
with
 
respect
 
to
 
proposed
 
actions
 
that
 
will
 
be
 
under
 
the
 
authority
 
of
 
the
 
federal
government.
 
The
 
NEPA
 
process
 
involves
 
public
 
participation
 
and
 
can
 
involve
 
lengthy
 
timeframes.
 
Ultimately,
federal agencies may require mitigation measures pursuant
 
to their NEPA
 
review.
On
 
July
 
16,
 
2020,
 
the
 
White
 
House
 
Council
 
on
 
Environmental
 
Quality,
 
or
 
the
 
CEQ
 
finalized
 
a
 
proposed
 
rule,
which went into effect on September 14, 2020.
 
The new rule made it easier to obtain approval
 
for new projects,
including by eliminating the need to evaluate so-called
 
cumulative impacts which could ultimately limit agencies’
consideration of climate change
 
and greenhouse gas
 
emissions. However,
 
pursuant to Executive
 
Order 13990,
CEQ began
 
a comprehensive
 
review of
 
the 2020
 
rule and
 
announced a
 
phased approach
 
to amending
 
NEPA
regulations. An Interim Final
 
Rule was issued June
 
29, 2021 which extended
 
the deadline for Federal
 
agencies
to develop or update their NEPA
 
implementing procedures to conform to the CEQ regulations
 
by two years.
Solid Waste Disposal Act of 1995 and Resource
 
Conservation and Recovery Act of 1976
The Solid
 
Waste Disposal
 
Act of 1965,
 
or SWDA,
 
was the
 
first federal
 
act to target
 
waste disposal
 
technology.
The
 
SWDA
 
governs
 
disposal
 
of
 
both
 
municipal
 
and
 
industrial
 
waste,
 
promotes
 
advancement
 
of
 
waste
management technology
 
and sets
 
waste management
 
standards. The
 
SWDA was
 
amended by
 
the Resource
Conservation and
 
Recovery
 
Act of
 
1976, or
 
RCRA. RCRA
 
affects
 
U.S. coal
 
mining operations
 
by establishing
“cradle to
 
grave” requirements
 
for the
 
generation,
 
transportation,
 
treatment, storage
 
and disposal
 
of solid
 
and
hazardous
 
wastes.
 
The
 
RCRA
 
also
 
addresses
 
the
 
environmental
 
effects
 
of
 
certain
 
past
 
hazardous
 
waste
treatment, storage
 
and disposal
 
practices, and
 
may require
 
a current
 
or past
 
site owner
 
or operator
 
to remove
improperly
 
disposed
 
hazardous
 
wastes.
 
The
 
RCRA
 
also
 
sets
 
forth
 
a
 
framework
 
for
 
managing
 
certain
 
non-
hazardous
 
solid
 
wastes.
 
Part
 
or
 
all
 
of
 
the
 
RCRA
 
program
 
may
 
be
 
delegated
 
to
 
a
 
state
 
pursuant
 
to
 
a
 
state
implementation plan if the state standards are at least
 
as stringent as federal standards.
Subtitle C of the
 
RCRA exempted fossil
 
fuel combustion wastes
 
from hazardous waste
 
regulation until the
 
EPA
completed
 
a
 
report
 
to
 
Congress
 
and
 
made
 
a
 
determination
 
on
 
whether
 
the
 
wastes
 
should
 
be
 
regulated
 
as
hazardous. On December 19, 2014, the EPA
 
announced the final rule on disposal of coal combustion
 
residuals,
or CCR
 
or coal
 
ash, by
 
electric utilities
 
and independent
 
power producers.
 
As finalized,
 
the rule
 
continues the
exemption of
 
CCR from
 
regulation as
 
a hazardous
 
waste, but
 
does impose
 
new requirements
 
at existing
 
CCR
surface impoundments
 
and landfills
 
that will need
 
to be
 
implemented over
 
a number
 
of different
 
time-frames in
the coming months
 
and years,
 
as well as
 
at new surface
 
impoundments and
 
landfills. On August
 
24, 2018, the
U.S. Court of Appeals for the D.C. Circuit held that certain provisions of the EPA’s
 
CCR rule were not sufficiently
protective, and it invalidated those provisions. Since then, the
 
EPA has finalized
 
changes to its CCR regulations
in response to
 
some aspects of
 
the court’s ruling, primarily
 
to regulate unlined ponds
 
but extend certain
 
deadlines
for initiating their closure, and allowing site-specific alternate
 
liner determinations.
 
The Biden
 
Administration’s
 
January 20, 2021
 
executive order
 
for review
 
of environmental
 
regulations indicated
that the
 
Biden
 
Administration will
 
review
 
environmental
 
regulations
 
affecting
 
the
 
management
 
and disposal
 
of
CCR. On January
 
11,
 
2022, the
 
EPA
 
announced that
 
it was
 
taking steps
 
to protect
 
groundwater from
 
coal ash
contamination, including
 
plans to
 
finalize a
 
federal permitting program
 
for the
 
disposal of
 
coal ash
 
and establishing
regulations for legacy coal
 
ash surface impoundments.
 
We cannot predict
 
at this time if and/or
 
when such rules
will go into effect.
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
37
The EPA
 
regulations on CCR
 
management and disposal
 
exempt coal ash
 
that is disposed
 
of at mine
 
sites and
reserve any regulation thereof to the Office
 
of Surface Mining Reclamation and Enforcement
 
or "OSMRE." After
proposing CCR regulations in 2007,
 
the OSMRE suspended all rulemaking
 
actions on CCRs, but
 
could re-initiate
them
 
in
 
the
 
future.
 
In
 
addition,
 
while
 
many
 
mining
 
wastes
 
such
 
as
 
overburden
 
and
 
coal
 
cleaning
 
wastes
 
are
exempt from
 
RCRA hazardous
 
waste regulations,
 
certain wastes
 
may be
 
subject to
 
the RCRA’s
 
requirements.
The RCRA also governs underground
 
storage tanks containing hazardous
 
substances and petroleum products,
which are used in some coal mining operations, although we do not have underground storage tanks associated
with our U.S. Operations.
The Biden
 
Administration’s
 
January 20, 2021
 
executive order
 
for review
 
of environmental
 
regulations indicated
that the
 
Biden
 
Administration will
 
review
 
environmental
 
regulations
 
affecting
 
the
 
management
 
and disposal
 
of
CCR.
 
It is unclear what effect this order will have
 
on the demand for coal.
Comprehensive Environmental Response, Compensation,
 
and Liability Act of 1980
Comprehensive Environmental
 
Response, Compensation
 
and Liability Act
 
of 1980, or
 
CERCLA, authorizes the
federal government
 
and private parties
 
to recover
 
costs to
 
address threatened
 
or actual releases
 
of hazardous
substances (broadly defined) that may
 
endanger public health or the
 
environment. Current owners and operators
of contaminated sites, past owners and operators
 
of contaminated sites at the time hazardous
 
substances were
disposed,
 
parties that
 
arranged
 
for the
 
disposal
 
or transport
 
of the
 
hazardous
 
substances
 
and transporters
 
of
hazardous substances
 
could be
 
potentially responsible
 
parties, or
 
PRPs, under
 
CERCLA. PRPs
 
may be
 
liable
for costs related to contaminated sites, including, but not limited to, site investigation and cleanup costs incurred
by the
 
government or
 
other parties,
 
damages to
 
natural resources
 
and costs
 
of certain
 
health assessments
 
or
studies.
 
In
 
addition,
 
CERCLA
 
authorizes
 
the
 
federal
 
government
 
to
 
order
 
PRPs
 
to
 
conduct
 
investigation
 
and
cleanup of releases of hazardous substances at certain contaminated
 
sites.
CERCLA requires that a list of contaminated sites, referred to as the National Priorities List, be compiled
 
by EPA
using certain criteria to evaluate the potential relative risk to the public health and the environment from releases
or threatened releases of
 
hazardous substances. Strict, joint and
 
several and retroactive liability may
 
be imposed
on hazardous
 
substance generators
 
and facility
 
owners and
 
operators, regardless
 
of fault
 
or the
 
legality of
 
the
original disposal activity. The failure to comply with a federal
 
government order under CERCLA may result in
 
civil
penalties, including
 
fines and/or
 
punitive damages,
 
in addition
 
to the
 
costs incurred
 
by the
 
federal government
due to the party’s failure to comply with an order.
We could
 
face liability
 
under CERCLA
 
and similar
 
state laws
 
for properties
 
that (1)
 
we currently
 
own, lease
 
or
operate, (2) we,
 
our predecessors,
 
or former
 
subsidiaries have
 
previously owned,
 
leased or
 
operated, (3) sites
to which
 
we, our
 
predecessors
 
or former
 
subsidiaries,
 
sent waste
 
materials, and
 
(4) sites at
 
which
 
hazardous
substances from our facilities’ operations have otherwise
 
come to be located.
Federal Mine Safety and Health Act of 1977
The Mine Act, which was
 
amended by the Mine Improvement and
 
New Emergency Response Act of 2006,
 
or the
MINER Act, governs federal oversight of mine safety and
 
authorizes the U.S. Department of Labor’s Mine Safety
and Health
 
Administration,
 
or MSHA,
 
to regulate
 
safety
 
and health
 
conditions for
 
employees working
 
in mines
within
 
the
 
United
 
States,
 
and
 
to
 
enforce
 
various
 
mandatory
 
health
 
and
 
safety
 
requirements.
 
The
 
Mine
 
Act
mandates four annual inspections
 
of underground coal
 
mines, two annual inspections
 
of all surface coal
 
mines,
and permits
 
inspections in
 
response to
 
employee complaints
 
of unsafe
 
working conditions.
 
The statute
 
and its
regulations also
 
mandate miner
 
training, mine
 
rescue teams
 
for all
 
underground mines, and
 
involvement of
 
miners
and their
 
representatives
 
in
 
health and
 
safety
 
activities.
 
MSHA has
 
also
 
promulgated
 
regulations
 
governing
 
a
wide
 
range
 
of
 
activities,
 
including
 
roof
 
support,
 
ventilation,
 
combustible
 
materials,
 
electrical
 
equipment,
 
fire
protection,
 
explosives
 
and
 
blasting,
 
and
 
mine
 
emergencies.
 
MSHA
 
has
 
the
 
statutory
 
authority
 
to
 
issue
 
civil
penalties for non-compliance, to set the period for abatement
 
of violations, and to seek injunctive relief requiring
a
 
company
 
to
 
cease
 
operations
 
until
 
certain
 
conditions
 
are
 
corrected.
 
The
 
MINER
 
Act
 
requires
 
mine
 
specific
emergency
 
response
 
plans
 
in
 
underground
 
coal
 
mines,
 
implemented
 
new
 
regulations
 
regarding
 
mine
 
rescue
teams and sealing
 
of abandoned areas,
 
requires prompt
 
notification of mine
 
accidents, and
 
imposes enhanced
civil and criminal
 
penalties for
 
violations. Various
 
states also
 
have enacted
 
their own
 
new laws
 
and regulations
addressing many of these
 
same subjects. MSHA continues
 
to interpret and implement
 
various provisions of the
MINER Act, along with introducing
 
new proposed regulations and standards.
 
For example, the second phase
 
of
MSHA’s
 
respirable
 
coal
 
mine
 
dust
 
rule
 
went
 
into
 
effect
 
in
 
February
 
2016
 
and
 
requires
 
increased
 
sampling
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
38
frequency and the use of continuous personal dust
 
monitors. In August 2016, the third and final phase of
 
the rule
became effective, reducing the overall respirable dust standard in
 
coal mines from 2.0 to
 
1.5 milligrams per cubic
meter of air.
 
In the last several
 
years, MSHA has also
 
proposed regulations governing
 
respirable silica, and
 
the
exposure of miners to
 
underground diesel exhaust fumes, and
 
testing, evaluation, and approval of
 
electric motor-
driven mine equipment and accessories.
 
MSHA has issued guidance for employers and workers regarding how
to mitigate the
 
risks of COVID-19
 
rather than mandatory
 
standards.
 
During a September
 
29, 2021 stakeholder
call, MSHA leadership indicated that it would
 
not issue an Emergency Temporary
 
Standard requiring COVID-19
vaccinations or testing at mine sites.
Black Lung (Coal Worker’s Pneumoconiosis)
The
 
Mine
 
Act
 
amended
 
the
 
Federal
 
Coal
 
Mine
 
Health
 
and
 
Safety
 
Act
 
of
 
1969,
 
which
 
is
 
the
 
legislation
 
that
mandates compensation
 
for miners
 
who were
 
totally and
 
permanently
 
disabled
 
by the
 
progressive
 
respiratory
disease caused
 
by coal
 
workers’
 
pneumoconiosis,
 
or
 
black lung.
 
Under
 
current
 
federal law,
 
a U.S.
 
coal
 
mine
operator must
 
pay federal
 
black lung
 
benefits and
 
medical expenses
 
to claimants
 
who are
 
current employees,
and
 
to
 
claimants
 
who
 
are
 
former
 
employees
 
who
 
last
 
worked
 
for
 
the
 
operator
 
after
 
July 1,
 
1973,
 
and
 
whose
claims for benefits are allowed. Coal mine operators must also make payments to a trust fund for
 
the payment of
benefits and medical expenses
 
to claimants who last
 
worked in the coal
 
industry prior to July 1,
 
1973. The trust
fund is
 
funded by
 
an excise
 
tax on
 
sales of
 
U.S. production,
 
excluding export
 
sales, of
 
up to
 
$1.21 per
 
Mt for
deep-mined coal and up to $0.61 per Mt for surface-mined coal, each limited to 4.4% of the gross
 
sales price. In
2019,
 
these
 
tax
 
rates
 
were
 
cut
 
in
 
half
 
compared
 
to
 
the
 
pre-2019
 
level,
 
falling
 
to
 
$0.61
 
per
 
Mt
 
of
underground-mined coal or $0.31 per Mt of surface-mined coal, limited
 
to 2% of the sales price. Our total excise
taxes paid
 
to this
 
trust fund
 
in 2020
 
were $0.9
 
million.
 
In December
 
2019, President
 
Trump
 
signed
 
into law
 
a
provision that restored the rate
 
to its pre-2019 level through
 
December 31, 2020. On December
 
27, 2020, then-
President Trump extended the
 
trust fund excise
 
tax through December 31,
 
2021 at the
 
pre-2019 rate. Historically,
very
 
few
 
of
 
the
 
miners
 
who
 
sought
 
federal
 
black
 
lung
 
benefits
 
were
 
awarded
 
these
 
benefits;
 
however,
 
the
approval rate has increased following implementation of
 
black lung provisions contained in the
 
Patient Protection
and
 
Affordable
 
Care
 
Act
 
of
 
2010,
 
or
 
the
 
Affordable
 
Care
 
Act.
 
The
 
Affordable
 
Care
 
Act
 
introduced
 
significant
changes to the
 
federal black lung program,
 
including an automatic survivor
 
benefit paid upon
 
the death of
 
a miner
with
 
an
 
awarded
 
black
 
lung
 
claim,
 
and
 
established
 
a
 
rebuttable
 
presumption
 
with
 
regard
 
to
 
pneumoconiosis
among miners with 15 or
 
more years of coal mine
 
employment that are totally disabled
 
by a respiratory condition.
These changes
 
could have
 
a material
 
impact on
 
our costs
 
expended in
 
association with
 
the federal
 
black lung
program. In addition to
 
possibly incurring liability
 
under federal statutes,
 
we may also be
 
liable under state
 
laws
for black
 
lung claims.
 
See Note
 
20
to the
 
accompanying audited
 
Consolidated Financial
 
Statements for
 
further
information of applicable insurance coverage.
National Labor Relations Act of 1935
The National
 
Labor Relations
 
Act of
 
1935
, or
 
the NLRA,
 
governs collective
 
bargaining and
 
private sector
 
labor
and management relations.
 
While we do not
 
have a unionized workforce
 
in the United States,
 
to the extent that
non-supervisory employees decide
 
to seek representation
 
or engage in
 
other protected concerted
 
labor activities,
the NLRA
 
and the
 
rules promulgated
 
by the
 
National
 
Labor Relations
 
Board, or
 
NLRB, set
 
the parameters
 
for
employees’ and union activity and our
 
response. The NLRA applies to both
 
unionized and non-union workforces.
Any employee
 
complaints related
 
to the
 
pandemic and
 
any related
 
labor actions,
 
if they
 
are tied
 
to terms
 
and
conditions of employment
 
that affect the
 
workforce generally,
 
will be governed
 
by the NLRA.
 
In addition, recent
NLRB-
 
promulgated
 
rules
 
regarding
 
joint
 
employer
 
status
 
under
 
the
 
NLRA
 
clarified
 
the
 
basis
 
upon
 
which
contractors and
 
vendors, as
 
well as
 
their employees
 
(and the
 
unions representing
 
them), could
 
allege that
 
we
are jointly and severally liable for any unfair labor practices or bargaining
 
obligations of the third-party employer.
While the rules
 
made the joint
 
employer test generally
 
more employer-friendly,
 
there is always
 
the possibility of
claims that we are a joint employer with a contractor or
 
vendor.
Patient Protection and Affordable Care Act of
 
2010
The United States Patient Protection and Affordable Care Act, or the Affordable Care Act, was enacted in March
2010 and included substantial reforms to the U.S. health care system
 
intended to increase affordability of health
insurance, expand the Medicaid program and support innovative health care delivery methods
 
designed to lower
costs. The Affordable Care
 
Act included a number of provisions
 
designed to reduce Medicare
 
expenditures and
the cost of
 
health care generally, to reduce fraud
 
and abuse, and
 
to provide access to
 
increased health coverage.
For example,
 
the law
 
prohibits insurers from
 
refusing to
 
cover preexisting
 
conditions, requires coverage
 
for certain
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
39
types
 
of care,
 
and can
 
subject
 
certain large
 
employers
 
to a
 
shared responsibility
 
payment
 
if they
 
do not
 
offer
health coverage
 
to their
 
full-time employees.
 
The Affordable
 
Care Act
 
also created
 
government-run, taxpayer-
funded health insurance marketplaces (known as “Exchanges”).
The Affordable Care
 
Act impacts the
 
coal mining industry’s
 
costs of providing
 
health care benefits
 
to its eligible
active employees, with
 
both short term and
 
long term implications.
 
It affects health
 
care costs by,
 
among other
things, setting the maximum
 
age for covered dependents
 
to receive benefits at
 
26, requiring certain benefits
 
for
occupational
 
disease
 
related
 
illnesses,
 
and
 
eliminating
 
lifetime
 
dollar
 
limits
 
on
 
essential
 
benefits
 
per
 
covered
individual and restrictions
 
on annual dollar
 
limits on essential
 
benefits per covered
 
individual. The Affordable Care
Act also included
 
significant changes
 
to the federal
 
black lung program,
 
including an automatic
 
survivor benefit
paid upon death of a miner with an awarded black lung claim and the establishment
 
of a rebuttable presumption
with regard
 
to pneumoconiosis
 
among miners
 
with 15
 
or more
 
years of
 
coal mine
 
employment that
 
are totally
disabled by a respiratory condition. The
 
Affordable Care Act also provides lifetime benefits to
 
certain dependents
who
 
survive
 
the
 
death
 
of
 
a
 
miner,
 
if
 
the
 
miner
 
had
 
been
 
receiving
 
the
 
benefits
 
before
 
death.
 
For
 
additional
information, please see above “––Black Lung (Coal Worker’s
 
Pneumoconiosis).”
The
 
Affordable
 
Care
 
Act
 
has
 
faced
 
ongoing
 
legal
 
challenges,
 
including
 
litigation
 
and
 
legislation
 
seeking
 
to
invalidate or
 
modify some
 
or all
 
of the
 
law or
 
the manner
 
in which
 
it has
 
been implemented.
 
For example,
 
the
Further Consolidated Appropriations
 
Act of 2020 repealed
 
the “Cadillac tax,” which
 
would have imposed a
 
40%
tax on high-cost
 
employer plans starting
 
in 2022. The
 
constitutionality of the
 
individual mandate,
 
and the entire
Affordable Care
 
Act, was
 
challenged in
 
the Fifth
 
Circuit Court
 
of Appeals,
 
and is
 
currently under
 
review by
 
the
Supreme Court. The outcome of these cases is uncertain, and any change they make to the
 
Affordable Care Act
could have a significant impact on
 
the U.S. health care industry and
 
employers providing health coverage to their
workers. Further,
 
the fact
 
that implementation
 
of certain
 
aspects of
 
the Affordable
 
Care Act
 
can be
 
affected by
Executive Orders and regulations promulgated
 
by federal governmental agencies
 
that may change when a new
President takes office also contributes
 
to the uncertainty as
 
to how the
 
law will affect the
 
U.S. health care industry
and employers providing health coverage to their workers
 
.
Safe Drinking Water Act of 1974
The Safe
 
Drinking Water
 
Act of
 
1974, or
 
SDWA,
 
is the
 
federal law
 
that protects
 
public drinking
 
water supplies
throughout the United States. Under the SDWA,
 
the EPA sets
 
federal health-based standards for drinking water
quality and
 
implements
 
technical
 
and financial
 
programs
 
to ensure
 
drinking water
 
safety.
 
The SDWA
 
requires
regular monitoring and
 
reporting of water
 
quality.
 
The SDWA
 
is applicable to
 
public water systems
 
that have at
least 15
 
service connections or
 
serve at least
 
25 people per
 
day for
 
60 days of
 
the year. Further, SDWA standards
apply to water systems
 
based on their type
 
and size. There are
 
four categories: i)
 
community water systems,
 
ii)
non-community water systems, iii) non-transient,
 
non-community water systems and iv)
 
transient non-community
water systems.
The
 
SDWA
 
requires
 
the
 
EPA
 
to
 
establish
 
National
 
Primary
 
Drinking
 
Water
 
Regulations
 
for
 
contaminants
 
that
may
 
cause
 
adverse
 
public
 
health
 
effects.
 
These
 
regulations
 
include
 
mandatory
 
requirements
 
and
 
non-
enforceable health goals.
 
The EPA
 
sets regulations
 
for drinking water
 
system concentrations
 
of certain organic
contaminants,
 
inorganic
 
contaminants,
 
microbiological
 
contaminants,
 
disinfection
 
byproducts,
 
residual
disinfectant levels, and radionuclide
 
levels. The EPA
 
also sets filtration requirements
 
for drinking water systems
that vary depending on the size of the population served
 
by the system.
The SDWA
 
also regulates the
 
underground injection of
 
fluids into porous
 
formations or rocks
 
through wells and
similar conveyance systems, and regulates the construction,
 
operation, permitting and closure of such wells.
The SDWA can impact coal mining operations in the United States to the extent that the operations could impact
drinking water supplies.
National Historic Preservation Act of 1966
The
 
National
 
Historic
 
Preservation
 
Act
 
of
 
1966,
 
or
 
NHPA,
 
governs
 
the
 
preservation
 
of
 
historical
 
properties
throughout
 
the
 
United
 
States.
 
The
 
NHPA
 
requires
 
the
 
Department
 
of
 
the
 
Interior’s
 
National
 
Park
 
Service
 
to
implement
 
the
 
national
 
policy
 
to
 
preserve
 
for
 
public
 
use
 
historic
 
sites,
 
buildings
 
and
 
objects
 
of
 
national
significance for the inspiration and benefit of the people of the United States. Alternatively,
 
a state may carry out
this program
 
with
 
oversight
 
from the
 
Department
 
of the
 
Interior
 
if the
 
Department
 
of the
 
Interior
 
approves
 
the
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
40
state’s
 
historic
 
preservation
 
program.
 
In
 
executing
 
this
 
policy,
 
the
 
National
 
Park
 
Service
 
identifies
 
National
Historic Landmarks
 
and places
 
them on
 
a National
 
Register
 
of Historic
 
Places.
 
The NHPA
 
requires that
 
each
federal agency prior to authorizing expenditure of federal funds on a federal or federally assisted undertaking, or
prior
 
to
 
issuing
 
a
 
federal
 
license
 
for
 
such
 
an
 
undertaking,
 
consider
 
the
 
effect
 
of
 
the
 
undertaking
 
on
 
historic
resources and to
 
provide the Advisory
 
Council on Historic
 
Preservation with a
 
reasonable opportunity to
 
comment
on the undertaking.
 
Accordingly, the NHPA could create an additional level
 
of scrutiny on
 
a coal mining
 
operation,
particularly during the permitting process, to the extent
 
that a mining operation could come within the scope of
 
a
historical site.
 
The SMCRA
 
also provides
 
protection for
 
historic resources
 
that would
 
be adversely
 
affected by
mining operations by requiring the OSM to comply with the NHPA.
 
If a property is listed on the National Register
of Historic Places,
 
SMCRA requires consideration
 
of the property’s
 
historic values
 
in determining issuance
 
of a
surface coal mining permit.
Endangered Species Act of 1973
The Endangered Species
 
Act of 1973,
 
or ESA, governs
 
the protection of
 
endangered species in
 
the United States
and
 
requires
 
the
 
U.S.
 
Department
 
of
 
the
 
Interior’s
 
Fish
 
and
 
Wildlife
 
Service
 
and
 
the
 
National
 
Oceanic
 
and
Atmospheric
 
Administration’s
 
National
 
Marine
 
Fisheries
 
Service
 
to
 
formally
 
review
 
any
 
federally
 
authorized,
funded or
 
administered action
 
that could
 
negatively affect
 
endangered or
 
threatened species.
 
Under the
 
ESA,
the responsibilities of
 
these agencies
 
include listing
 
and delisting
 
species, designating critical
 
habitats, developing
recovery plans and conducting five-year reviews of listed species.
The
 
Fish
 
and
 
Wildlife
 
Service
 
studies
 
projects
 
for
 
possible
 
effects
 
to
 
endangered
 
species
 
and
 
then
 
can
recommend alternatives or mitigation measures.
 
The OSM and state regulators
 
require mining companies to hire
a government-approved contractor to conduct surveys for
 
potential endangered species, and the
 
surveys require
approval from state and
 
federal biologists who
 
provide guidance on
 
how to minimize
 
mines’ potential effects
 
on
endangered
 
species.
 
Certain
 
endangered
 
species
 
are
 
more
 
typically
 
at
 
issue
 
under
 
the
 
ESA
 
with
 
respect
 
to
mining, including the long-eared
 
bat and Guyandotte crayfish,
 
which are found in
 
the Central Appalachian region,
including
 
parts
 
of
 
Virginia
 
and
 
West
 
Virginia.
 
Mitigation
 
methods
 
can
 
cause
 
increased
 
costs
 
to
 
coal
 
mining
operators. Changes in
 
listings or requirements
 
under these regulations
 
could have a
 
material adverse effect
 
on
our costs
 
or our
 
ability to
 
mine some
 
of our
 
properties
 
in accordance
 
with
 
our current
 
mining plans.
 
The ESA
allows landowners to receive
 
a special permit to take
 
listed species in some circumstances,
 
provided they have
developed a Habitat Conservation Plan approved by the
 
Fish and Wildlife Service.
The U.S.
 
Department of
 
the Interior
 
issued three
 
proposed rules
 
in July
 
2018 aiming
 
to streamline
 
and update
the ESA, and they became effective on September 26, 2019. The rules weaken the protections afforded species
listed as
 
threatened, and
 
make it
 
more difficult
 
to add
 
species to
 
the threatened
 
and endangered
 
species lists
and easier to delist
 
species. However,
 
on June 4, 2021,
 
the Fish and Wildlife
 
Service and the National
 
Oceanic
and Atmospheric
 
Administration's
 
National
 
Marine Fisheries
 
Service announced
 
a plan
 
to strengthen
 
the ESA
and revise or rescind regulations passed under the Trump
 
Administration.
Migratory Bird Treaty Act of 1918
The Migratory Bird
 
Treaty Act
 
of 1918, or
 
MBTA,
 
as modified
 
by the Migratory
 
Bird Treaty
 
Reform Act of
 
2004,
makes it unlawful without
 
a waiver to pursue,
 
hunt, take, capture, kill
 
or sell migratory
 
birds, or any part, nest
 
or
egg of any migratory
 
bird. A migratory
 
bird species is
 
included on the
 
list of species
 
protected by the
 
MBTA
 
if it
meets one
 
or more
 
of the
 
following
 
criteria:
 
i) it
 
occurs
 
in the
 
United
 
States
 
or U.S.
 
territories
 
as the
 
result
 
of
natural biological or
 
ecological processes and
 
is currently, or was previously
 
listed as, a
 
species or part
 
of a
 
family
protected by certain
 
international treaties,
 
or their amendments,
 
entered into by
 
the United States
 
and Canada,
Mexico, Japan or Russia;
 
ii) revised taxonomy
 
results in it being
 
split from a species
 
that was previously
 
on the
list,
 
and
 
the
 
new
 
species
 
occurs
 
in
 
the
 
United
 
States
 
or
 
U.S.
 
territories
 
as
 
the
 
result
 
of
 
natural
 
biological
 
or
ecological processes; or iii) new evidence exists for its natural occurrence
 
in the United States or U.S. territories
resulting from
 
natural
 
distributional
 
changes
 
and
 
the
 
species
 
occurs
 
in
 
a
 
protected
 
family.
 
The
 
Migratory
 
Bird
Treaty Reform Act of 2004
 
requires the Fish and Wildlife Service to publish
 
an informational list of all nonnative,
human-introduced
 
bird
 
species
 
to
 
which
 
MBTA
 
does
 
not
 
apply.
 
The
 
most
 
recent
 
list
 
of
 
all
 
nonnative,
 
human-
introduced bird species was published on April 16, 2020.
Since coal mining is
 
seen as an industry that
 
can threaten bird populations, coal operators
 
are required to ensure
that their
 
operations do
 
not negatively
 
impact migratory
 
birds, or
 
to take
 
mitigation measures.
 
Violations of
 
the
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
41
MBTA
 
are
 
either misdemeanor
 
or felonies
 
punishable
 
by a
 
fine
 
or imprisonment.
 
Efforts
 
in
 
2020 and
 
2021
 
to
narrow the applicability of the MBTA
 
were unsuccessful.
Regulation of explosives
Our surface
 
mining operations
 
are subject
 
to numerous
 
regulations relating
 
to blasting
 
activities,
 
including the
Federal Safe Explosives
 
Act, or SEA. SEA
 
applies to all
 
users of explosives.
 
Knowing or willful violations
 
of the
SEA may
 
result in
 
fines, imprisonment,
 
or both.
 
In addition,
 
violations of
 
SEA may
 
result in
 
revocation of
 
user
permits and seizure or forfeiture of explosive materials. Pursuant to federal regulations, we incur costs
 
to design
and implement blast schedules and to conduct pre-blast surveys and blast monitoring. In addition, the storage of
explosives is
 
subject to
 
strict regulatory
 
requirements established
 
by four
 
different federal
 
regulatory agencies.
For example, pursuant to a rule issued by the Department of Homeland Security in 2007, facilities
 
in possession
of chemicals
 
of interest,
 
including ammonium nitrate
 
at certain
 
threshold levels, must
 
complete a
 
screening review
in
 
order
 
to
 
help
 
determine
 
whether
 
there
 
is
 
a
 
high
 
level
 
of
 
security
 
risk
 
such
 
that
 
a
 
security
 
vulnerability
assessment and
 
site security plan
 
will be
 
required. The Bureau
 
of Alcohol,
 
Tobacco and Firearms and Explosives,
or
 
ATF,
 
regulates
 
the
 
sale,
 
possession,
 
storage
 
and
 
transportation
 
of
 
explosives
 
in
 
interstate
 
commerce.
 
In
addition to
 
ATF regulation, the
 
U.S. Department of
 
Homeland Security is
 
evaluating a
 
proposed ammonium nitrate
security
 
program
 
rule.
 
In
 
2015,
 
the
 
OSM
 
also
 
proposed
 
a
 
rulemaking
 
addressing
 
nitrogen
 
oxide
 
clouds
 
from
blasting; on July 30, 2019, however,
 
the OSM withdrew the proposed rulemaking.
Available Information
We file
 
annual, quarterly
 
and current
 
reports and
 
other documents
 
with the
 
SEC under
 
the Exchange
 
Act. The
public
 
can
 
obtain
 
any
 
documents
 
that
 
we
 
file
 
with
 
the
 
SEC
 
at
 
www.sec.gov.
 
We
 
also
 
make
 
available
 
free
 
of
charge our
 
Annual Report
 
on Form
 
10-K, Quarterly
 
Reports on
 
Form 10-Q,
 
Current Reports
 
on Form
 
8-K and
any amendments
 
to those
 
reports filed
 
or furnished
 
pursuant to
 
Section 13(a)
 
or 15(d)
 
of the
 
Exchange Act
 
as
soon as
 
reasonably practicable
 
after filing
 
such materials
 
with, or
 
furnishing such
 
materials to,
 
the SEC,
 
on or
through our internet website, https://coronadoglobal.com.au/. We are not including the information contained on,
or accessible through, any website as a part of, or incorporating it by reference into, this Annual Report
 
on Form
10-K, unless expressly noted.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
42
ITEM 1A.
 
RISK FACTORS.
An investment
 
in our
 
securities
 
is speculative
 
and involves
 
a number
 
of risks.
 
We
 
believe
 
the risks
 
described
below are the material
 
risks that we face.
 
However, the
 
risks described below may
 
not be the only risks
 
that we
face.
 
Additional
 
unknown
 
risks
 
or
 
risks
 
that
 
we
 
currently
 
consider
 
immaterial,
 
may
 
also
 
impair
 
our
 
business
operations. You should carefully consider the specific risk factors discussed below,
 
together with the information
contained
 
in
 
this
 
Annual
 
Report
 
on
 
Form
 
10-K,
 
including
 
Item 7.
 
“Management’s
 
Discussion
 
and
 
Analysis
 
of
Financial Condition and Results of
 
Operations” and our Consolidated Financial Statements and the
 
related notes
to those
 
statements
included elsewhere in
 
this Annual Report
 
on Form 10-K.
 
If any of
 
the events or
 
circumstances
described below
 
actually occurs,
 
our business, financial
 
condition or
 
results of
 
operations could
 
suffer,
 
and the
trading price of our securities could decline significantly.
Some of these risks include:
•
Concerns about the environmental
 
impacts of coal combustion,
 
including possible impacts on
 
global climate
issues, are resulting in increased
 
regulation of coal combustion and coal
 
mining in many jurisdictions, which
could
 
significantly
 
affect
 
demand
 
for
 
our
 
products
 
or
 
our
 
securities
 
and
 
reduce
 
access
 
to
 
capital
 
and
insurance;
•
Demand for our Met coal is significantly dependent on the steel
 
industry
;
•
We are subject
 
to extensive health and
 
safety laws and
 
regulations that could
 
have a material
 
adverse effect
on our reputation and financial condition and results of operations
 
;
•
In
 
times
 
of
 
drought
 
and/or
 
shortage
 
of
 
available
 
water,
 
our
 
operations
 
and
 
production,
 
particularly
 
at
Curragh, could
 
be negatively
 
impacted if
 
the regulators
 
impose restrictions
 
on our
 
water offtake
 
licenses
that are required for water used in the CPPs;
•
Our business may be adversely affected by the impact on the global economy due to, among other
 
events,
the ongoing military conflict between Russia and Ukraine or other
 
significant geopolitical tensions
;
•
Our business, financial
 
condition and results
 
of operations may
 
be adversely impacted
 
by global pandemics,
including the COVID-19 pandemic, or other widespread public
 
health concerns
;
•
Our profitability
 
depends upon the
 
prices we
 
receive for
 
our coal.
 
Prices for
 
coal are
 
volatile and
 
can fluctuate
widely based upon a number of factors beyond our control
;
•
We face increasing competition, which could adversely
 
affect profitability;
•
We may face restricted access to international markets
 
in the future
;
•
If transportation for our
 
coal becomes unavailable
 
or uneconomic for
 
our customers, our
 
ability to sell coal
could suffer;
•
Take-or-pay
 
arrangements within the coal industry could unfavorably
 
affect our profitability
;
•
A
 
decrease
 
in
 
the
 
availability
 
or
 
increase
 
in
 
costs
 
of
 
key
 
supplies,
 
capital
 
equipment,
 
commodities
 
and
purchased components, such as diesel
 
fuel, steel, explosives and
 
tires could materially and
 
adversely affect
our financial condition and results of operations
;
•
Defects
 
in
 
title
 
or
 
loss
 
of
 
any
 
leasehold
 
interests
 
in
 
our
 
properties
 
could
 
limit
 
our
 
ability
 
to
 
mine
 
these
properties or result in significant unanticipated costs;
•
We may be unable
 
to obtain, renew or
 
maintain permits necessary
 
for our operations, which
 
would reduce
coal production, cash flows and profitability;
•
A shortage of skilled labor in the mining industry could pose a risk to achieving improved labor productivity
;
•
The existence
 
(or
 
claimed
 
existence)
 
of
 
native
 
title
 
on
 
land within
 
our
 
Australian
 
tenements
 
may impose
restrictions on the construction of our expansion activities
 
and our continued operations;
•
Risks inherent to mining
 
operations could impact the amount
 
of coal produced, cause
 
delay or suspend coal
deliveries, or increase the cost of operating our business;
•
Our long-term success
 
depends upon our
 
ability to continue
 
discovering, or acquiring
 
and developing assets
containing, coal reserves that are economically recoverable
;
•
We
 
rely
 
on
 
estimates
 
of
 
our
 
recoverable
 
resources
 
and
 
reserves,
 
which
 
are
 
complex
 
due
 
to
 
geological
characteristics of the properties and the number of assumptions
 
made
;
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
43
•
Our profitability could be affected
 
adversely by the failure of
 
suppliers and/or outside contractors to perform;
•
Our
 
inability
 
to
 
replace
 
or
 
repair
 
damaged
 
or
 
destroyed
 
equipment
 
or
 
facilities
 
in
 
a
 
timely
 
manner
 
could
materially and adversely affect our financial condition and results
 
of operations;
•
 
Our
 
ability
 
to
 
operate
 
effectively
 
could
 
be
 
impaired
 
if
 
we
 
lose
 
key
 
personnel
 
or
 
fail
 
to
 
attract
 
qualified
personnel;
•
We may not have adequate insurance coverage for
 
some business risks
;
•
Cybersecurity
 
attacks,
 
natural
 
disasters,
 
terrorist
 
attacks
 
and
 
other
 
similar
 
crises
 
or
 
disruptions
 
may
negatively affect our business, financial condition and results
 
of operations;
•
Mining in the CAPP is more complex and
 
involves more regulatory constraints than mining in other areas of
the U.S., which could affect our mining operations and
 
cost structures in these areas;
•
The
 
loss
 
of,
 
or
 
significant
 
reduction
 
in,
 
purchases
 
by
 
our
 
largest
 
customers
 
could
 
adversely
 
affect
 
our
revenues;
•
If a
 
substantial number
 
of our
 
customers fail
 
to perform
 
under our
 
contracts with
 
them, our
 
revenues and
operating profits could suffer;
•
If our ability
 
to collect payments
 
from customers is impaired,
 
our revenues and operating
 
profits could suffer;
•
Our existing
 
and future
 
indebtedness
 
may limit
 
cash
 
flow available
 
to invest
 
in the
 
ongoing
 
needs of
 
our
businesses,
 
which could
 
prevent
 
us from
 
fulfilling
 
our
 
obligations under
 
our senior
 
secured
 
notes, senior
secured asset-based
 
revolving credit agreement
 
in an initial
 
aggregate principal
 
amount of $100.0
 
million,
or
 
the
 
ABL
 
Facility
 
(more
 
fully
 
discussed
 
in
 
the
 
Management
 
Discussion
 
&
 
Analysis
 
Section
 
at
 
Item
 
7.
“Liquidity and Capital Resources), and other debt, and we may be forced to take other actions to
 
satisfy our
obligations under our debt, which may not be successful
 
;
•
We adjust our capital structure from time to time and
 
may need to increase our debt leverage, which would
make us more sensitive to the effects of economic downturns
 
;
•
Our business
 
may require
 
substantial ongoing
 
capital
 
expenditures,
 
and
 
we may
 
not have
 
access
 
to the
capital required to reach full productive capacity at our mines;
•
Risks
 
related
 
to
 
our
 
investment
 
in
 
WICET
 
may
 
adversely
 
affect
 
our
 
financial
 
condition
 
and
 
results
 
of
operations;
•
Risks related to
 
the Supply
 
Deed with Stanwell
 
may adversely
 
affect our financial
 
condition and results
 
of
operations;
•
We could be adversely affected if we fail to appropriately
 
provide financial assurances for our obligations;
•
Mine closures entail substantial
 
costs. If we prematurely close
 
one or more of
 
our mines, our operations and
financial performance would likely be affected adversely;
•
If
 
the
 
assumptions
 
underlying
 
our
 
provision
 
for
 
reclamation
 
and
 
mine
 
closure
 
obligations
 
prove
 
to
 
be
inaccurate, we could be required to expend greater amounts
 
than anticipated;
•
We could be negatively affected if we fail to maintain
 
satisfactory labor relations;
•
Our operations may
 
impact the environment
 
or cause
 
exposure to hazardous
 
substances, which could
 
result
in material liabilities to us; and
•
We are subject to extensive
 
forms of taxation, which impose
 
significant costs on us,
 
and future regulations
and developments could increase those costs or limit
 
our ability to produce coal competitively;
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
44
Environmental and Sustainability Risks
Concerns
 
about
 
the
 
environmental
 
impacts
 
of
 
coal
 
combustion,
 
including
 
possible
 
impacts
 
on
 
global
climate
 
issues,
 
are
 
resulting
 
in
 
increased
 
regulation
 
of
 
coal
 
combustion
 
and
 
coal
 
mining
 
in
 
many
jurisdictions,
 
which
 
could
 
significantly
 
affect
 
demand
 
for
 
our
 
products
 
or
 
our
 
securities
 
and
 
reduce
access to capital and insurance.
Global concerns
 
about climate
 
change continues
 
to attract
 
considerable attention,
 
particularly in
 
relation to
 
the
coal industry. Emissions from coal
 
consumption, both directly and
 
indirectly, and emissions from coal
 
mining itself
are subject to pending and proposed regulation as part of initiatives to address global climate change. A number
of
 
countries,
 
including
 
Australia
 
and
 
the
 
United
 
States,
 
have
 
already
 
introduced,
 
or
 
are
 
contemplating
 
the
introduction of, regulatory responses to GHGs, including the
 
extraction and combustion of fossil fuels, to address
the impacts of climate change.
There are three primary sources of GHGs associated with the coal industry.
 
First, the end use of our coal by our
customers
 
in
 
coal-fired
 
electricity
 
generation,
 
coke
 
plants,
 
and
 
steelmaking.
 
Second,
 
combustion
 
of
 
fuel
 
by
equipment used in
 
coal production and
 
to transport our
 
coal to
 
our customers. Third,
 
coal mining itself
 
can release
methane, which is considered to
 
be a more potent GHG
 
than carbon dioxide, directly into
 
the atmosphere. These
emissions from coal consumption, transportation
 
and production are subject to
 
pending and proposed regulation,
in the jurisdictions in which we operate as part of initiatives
 
to address global climate change.
As
 
a
 
result,
 
numerous
 
proposals
 
have
 
been
 
made
 
and
 
are
 
likely
 
to
 
continue
 
to
 
be
 
made
 
at
 
the
 
international,
national, regional and state levels of government to monitor and limit emissions of GHGs. In November 2014, an
agreement was
 
announced between
 
the United
 
States and
 
China to
 
cut GHGs
 
by more
 
than 25%
 
below 2005
levels
 
by
 
2025.
 
This
 
agreement
 
was
 
followed
 
by
 
the
 
UNFCCC,
 
conference
 
in
 
Paris,
 
France,
 
in
 
which
 
an
agreement was
 
adopted calling
 
for voluntary
 
emissions
 
reductions contributions,
 
or the
 
Paris Agreement.
 
The
Paris Agreement
 
was entered
 
into force
 
on November
 
4, 2016 after
 
ratification and
 
execution by
 
more than 55
countries,
 
which
 
account
 
for
 
at
 
least
 
55%
 
of
 
global
 
GHG
 
emissions.
 
The
 
Paris
 
Agreement
 
was
 
signed
 
by
representatives from 195
 
countries and aims
 
to hold back
 
the increase in
 
global temperatures, increase
 
the ability
of countries to adapt to
 
the adverse impacts of climate change and
 
provide channels to finance projects that lead
to GHG reductions.
 
On November 20, 2022, the Sharm el-Sheik Conference of Parties 27, or COP27, continued discussions around
fossil fuels from
 
Glasgow Conference of Parties
 
26, which called
 
on governments to accelerate
 
the dissemination
of technologies,
 
and
 
the adoption
 
of
 
policies, to
 
transition
 
toward
 
a low-emission
 
energy system,
 
including
 
by
accelerating the
 
phasedown of
 
unabated coal
 
power,
 
that is
 
coal power
 
that does
 
not include
 
the capture
 
and
storage of carbon dioxide emission and phase-out of inefficient
 
fossil fuel subsidies.
In
 
addition,
 
the
 
growth
 
of
 
alternative
 
energy
 
options,
 
such
 
as
 
renewables
 
and
 
disruptive
 
power
 
generation
technologies,
 
changes
 
in
 
community
 
or
 
government
 
attitudes
 
to
 
climate
 
change,
 
government
 
measures
 
to
subsidize renewable
 
energy
 
production while
 
reducing
 
subsidies for
 
the fossil
 
fuel industry,
 
efforts
 
to promote
divestment of fossil
 
fuel equities and
 
pressure from lenders
 
to limit funding
 
to fossil fuel
 
companies could result
in further development of alternative
 
energy industries and broader mainstream acceptance of
 
alternative energy
options which could
 
result in a
 
material reduction in
 
the demand for
 
coal. It could
 
also result in
 
reduced access
to capital to fund our activities as lenders and investors
 
divert capital to low emission sectors of the economy.
 
The absence of regulatory certainty,
 
global policy inconsistencies and direct regulatory impacts
 
(such as carbon
taxes or
 
other charges)
 
each have
 
the potential
 
to adversely
 
affect our
 
operations—either directly
 
or indirectly,
through suppliers and
 
customers. Collectively, these initiatives and developments could
 
result in higher
 
electricity
costs
 
to
 
us
 
or
 
our
 
customers
 
or
 
lower
 
the
 
demand
 
for
 
coal
 
used
 
in
 
electricity
 
generation,
 
which
 
could
 
in
 
turn
adversely impact our business.
At present, we
 
are principally focused on
 
Met coal production,
 
which is not
 
used in connection with
 
the production
of
 
coal-fired
 
electricity
 
generation.
 
The
 
market
 
for
 
our
 
coal
 
may
 
be
 
adversely
 
impacted
 
if
 
comprehensive
legislation
 
or
 
regulations
 
focusing
 
on
 
GHG
 
emission
 
reductions
 
are
 
adopted,
 
particularly
 
if
 
they
 
directly
 
or
indirectly impact the Met coal industry,
 
or if our ability to obtain capital for operations is materially reduced.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
45
We and
 
our customers
 
may also have
 
to invest
 
in carbon,
 
capture, usage
 
and storage
 
technologies in
 
order to
burn thermal
 
coal
 
and
 
comply
 
with
 
future
 
GHG
 
emission
 
standards.
 
The
 
potential
 
direct
 
and
 
indirect
 
financial
impact on us from future laws, regulations, policies and
 
technology developments may depend upon the degree
to which
 
any such
 
laws, regulations
 
and developments
 
force reduced
 
reliance on
 
coal as
 
a fuel
 
source. Such
developments
 
could
 
result
 
in
 
adverse
 
impacts
 
on
 
our
 
financial
 
condition
 
or
 
results
 
of
 
operations.
 
See
 
Item 1.
“Business—Regulatory Matters—Australia” and “Business—Regulatory
 
Matters—United States.”
Demand for our Met coal is significantly dependent on
 
the steel industry.
The majority of
 
the coal that
 
we produce
 
is Met coal
 
that is
 
sold, directly
 
or indirectly,
 
to steel
 
producers and
 
is
used in blast furnaces for steel production. Met coal,
 
specifically high-quality HCC and low-volatile PCI,
 
which is
produced at most of our
 
assets, has specific physical
 
and chemical properties, which are
 
necessary for efficient
blast furnace operation.
 
Therefore, demand for
 
our Met coal is
 
correlated to demands
 
of the steel industry.
 
The
steel industry’s
 
demand for
 
Met coal
 
is influenced
 
by a
 
number of
 
factors, including:
 
the cyclical
 
nature of
 
that
industry’s business; general economic
 
and regulatory conditions and demand
 
for steel; and the availability,
 
cost
and preference for substitutes for steel, such as aluminum, composites and plastics,
 
all of which may impact the
demand
 
for steel
 
products.
 
Similarly,
 
if
 
new
 
steelmaking
 
technologies
 
or practices
 
are developed
 
that
 
can
 
be
substituted
 
for
 
Met
 
coal
 
in
 
the
 
integrated
 
steel
 
mill
 
process,
 
then
 
demand
 
for
 
Met
 
coal
 
would
 
be
 
expected
 
to
decrease.
Although
 
conventional
 
blast
 
furnace
 
technology
 
has
 
been
 
the
 
most
 
economic
 
large-scale
 
steel
 
production
technology for a number of years, there can
 
be no assurance that over the longer term,
 
competitive technologies
not reliant on
 
Met coal would
 
not emerge,
 
which could
 
reduce the
 
demand and
 
price premiums
 
for Met coal.
 
A
significant reduction in
 
the demand for
 
steel products would
 
reduce the demand
 
for Met coal, which
 
could have
a material adverse effect on our financial condition
 
and results of operations.
Additionally, tariffs imposed by the United States on the import of certain steel products may impact foreign steel
producers
 
to
 
the
 
extent
 
their
 
production
 
is
 
imported
 
into the
 
United
 
States.
 
Future
 
tariffs
 
could
 
further
 
reduce
imports
 
of
 
steel
 
and
 
increase
 
U.S.
 
Met
 
coal
 
demand.
 
This
 
additional
 
U.S.
 
Met
 
coal
 
demand
 
could
 
be
 
met
 
by
reducing exports of Met coal and redirecting that volume
 
to domestic consumption.
The tariffs
 
established by
 
the United
 
States have
 
prompted retaliatory
 
tariffs from
 
key trading
 
partners, notably
Europe and China. Any further retaliatory tariffs by these or other countries to these tariffs may limit international
trade and adversely impact
 
global economic conditions. We cannot ascertain
 
the impact, if any, that similar tariffs
may have
 
on demand
 
for our
 
Met coal.
 
See “—We
 
may face
 
restricted
 
access
 
to international
 
markets in
 
the
future.”
We are
 
subject to
 
extensive health
 
and safety
 
laws and
 
regulations that
 
could have
 
a material
 
adverse
effect on our reputation and financial condition
 
and results of operations.
We are subject to extensive laws and regulations governing health and safety at coal
 
mines in the United States
and Australia. As a
 
result of increased stakeholder focus on
 
health and safety issues (such
 
as black lung disease
or
 
coal
 
workers’
 
pneumoconiosis),
 
there
 
is
 
a
 
risk
 
of
 
legislation
 
and
 
regulatory
 
change
 
that
 
may
 
increase
 
our
exposure to claims arising
 
out of current or
 
former activities or result in
 
increased compliance costs (e.g., through
requiring improved
 
monitoring standards
 
or contribution
 
to an
 
industry-pooled fund).
 
Regulatory agencies
 
also
have the authority, following
 
significant health and safety incidents, such as fatalities, to order mining operations
to be temporarily suspended or
 
the facility be permanently closed.
 
For example, on January 12, 2020,
 
operations
at our
 
Curragh mine were
 
temporarily suspended after
 
a contractor was
 
fatally injured during
 
a tire
 
change activity
in
 
the
 
main
 
workshop
 
on
 
site
 
and
 
on
 
November
 
21,
 
2021,
 
operations
 
at
 
our
 
Curragh
 
mine
 
were
 
temporarily
suspended after an employee
 
was fatally injured while working
 
in the dragline operations.
 
If further serious safety
incidents were to
 
occur at any
 
of our mining
 
facilities in the
 
future, it is
 
possible that a
 
regulator might impose
 
a
range
 
of
 
conditions
 
on
 
re-opening
 
of
 
a
 
facility,
 
including
 
requiring
 
capital
 
expenditures,
 
which
 
could
 
have
 
an
adverse effect on our reputation, financial condition
 
and results of operations.
For
 
additional
 
information
 
about
 
the
 
various
 
regulations
 
affecting
 
us,
 
see
 
Item 1.
 
“Business—Regulatory
Matters—Australia” and “Business—Regulatory Matters
 
—United States.”
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
46
Failure to comply with applicable anti-corruption and trade laws, regulations and policies could result in
fines and criminal
 
penalties, causing
 
a material adverse
 
effect on our
 
business, operating and
 
financial
prospects or performance.
Any
 
fraud,
 
bribery,
 
misrepresentation,
 
money
 
laundering,
 
violations
 
of
 
applicable
 
trade
 
sanctions,
anti-competitive
 
behavior
 
or
 
other
 
misconduct
 
by
 
our
 
employees,
 
contractors,
 
customers,
 
service
 
providers,
business
 
partners
 
and
 
other
 
third parties
 
could
 
result
 
in violations
 
of relevant
 
laws
 
and regulations
 
by us
 
and
subject us or relevant
 
individuals to corresponding regulatory
 
sanctions or other claims,
 
and could also result
 
in
an event of default under our financing arrangements. These unlawful activities
 
and other misconduct may have
occurred in
 
the past
 
and may
 
occur in
 
the future
 
and may
 
result in
 
civil and
 
criminal liability
 
under increasingly
stringent laws relating
 
to fraud, bribery,
 
sanctions, competition and
 
misconduct or cause
 
serious reputational or
financial
 
harm
 
to
 
us.
 
In
 
addition,
 
failure
 
to
 
comply
 
with
 
environmental,
 
health
 
or
 
safety
 
laws
 
and
 
regulations,
privacy laws and regulations,
 
U.S. trade sanctions,
 
the U.S. Foreign Corrupt
 
Practices Act and other
 
applicable
laws or regulations could result in litigation, the assessment of damages, the imposition of penalties, suspension
of production
 
or distribution,
 
costly changes
 
to equipment
 
or processes
 
due to
 
required corrective
 
action, or
 
a
cessation or interruption of operations.
We
 
have
 
policies
 
and
 
procedures
 
to
 
identify,
 
manage
 
and
 
mitigate
 
legal
 
risks
 
and
 
address
 
regulatory
requirements
 
and
 
other
 
compliance
 
obligations.
 
However,
 
there
 
can
 
be
 
no
 
assurance
 
that
 
such
 
policies,
procedures and established internal controls
 
will adequately protect us against
 
fraudulent or corrupt activity and
such activity could have an adverse effect on our reputation,
 
financial condition and results of operations.
In
 
times
 
of
 
drought
 
and/or
 
shortage
 
of
 
available
 
water,
 
our
 
operations
 
and
 
production,
 
particularly
 
at
Curragh, could be negatively impacted if
 
the regulators impose restrictions on our
 
water offtake licenses
that are required for water used in the CPPs.
In Queensland, all entitlements to the use, control and
 
flow of water are vested in the state and regulated by
 
the
Water Act
 
2000 (Qld).
 
Allocations under
 
the Water
 
Act 2000 (Qld)
 
can be managed
 
by a water
 
supply scheme
operator, such as SunWater Ltd. We have purchased the required water allocations for Curragh and
 
entered into
a suite of
 
related channel and pipeline
 
infrastructure agreements and river supply
 
agreements with SunWater
 
Ltd
to regulate the supply of water pursuant to these allocations.
The amount
 
of water
 
that is
 
available to
 
be taken
 
under a
 
water entitlement
 
will vary
 
from year
 
to year
 
and is
determined by
 
water sharing rules
 
of the
 
relevant catchment area.
 
These rules
 
will, for
 
example, state
 
a procedure
for water supply scheme holders to calculate
 
the water available to an allocation holder,
 
based on available and
predicted supply.
 
In situations
 
of severely
 
constrained supply
 
(such as during
 
a drought),
 
supply contracts
 
with
the scheme operator generally provide for a
 
reduced apportionment, with certain uses (e.g., domestic use) being
given higher
 
priority.
 
It is
 
possible that
 
during times
 
of drought
 
our water
 
offtake entitlements
 
in Australia
 
could
be reduced. If our water
 
offtake entitlement was reduced, the operations would have to
 
recycle more of the water
collected in
 
on-site dams
 
and former
 
mining pits,
 
from rainfall
 
and dewatering
 
activities, for
 
use in
 
the Curragh
CPP.
 
This may
 
impact our
 
ability to
 
maintain current
 
production levels
 
without incurring
 
additional costs,
 
which
could adversely impact our operations and production.
Decreases in demand for
 
coal-fired electricity and changes
 
in thermal coal consumption
 
patterns of the
United States and Australian electric power generators could
 
adversely affect our business.
In
 
addition
 
to
 
Met
 
coal,
 
our
 
Australian
 
Operations
 
and
 
U.S.
 
Operations
 
produce
 
some
 
thermal
 
coal.
 
Sales
 
of
thermal coal represented 34.7%
of tons sold and 5.3%
of the total revenues of our Australian
 
Operations for the
year ended December 31, 2022.
 
The majority of the thermal coal
 
produced by our Australian Operations
 
is sold
on a long-term supply
 
arrangement to Stanwell.
 
Sales of thermal coal
 
by our Australian Operations
 
to domestic
and export buyers are exposed to fluctuations in the global demand for thermal coal or electricity.
 
However, coal
sold to Stanwell is not directly exposed
 
to fluctuations in the global demand for
 
electricity or thermal coal. Under
the Stanwell supply contract,
 
Stanwell can set volumes, and
 
pricing is set at
 
significantly below-market rates. Our
cost of supplying coal to Stanwell has been and may continue to be greater than the price paid by Stanwell. See
“—Risks
 
related
 
to
 
the
 
Supply
 
Deed
 
with
 
Stanwell
 
may
 
adversely
 
affect
 
our
 
financial
 
condition
 
and
 
results
 
of
operations.”
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
47
For the
 
year ended
 
December 31,
 
2022, sales
 
of thermal
 
coal represented
 
4.3% of
 
tons sold
 
and 3.7%
 
of the
total
 
revenues
 
our
 
U.S.
 
Operations
 
for
 
the
 
year
 
ended
 
December
 
31,
 
2022.
 
As
 
such,
 
any
 
changes
 
in
 
coal
consumption by electric power generators in the United
 
States could impact our business over the long term.
While
 
power
 
generation
 
from
 
thermal
 
coal
 
remains
 
a
 
cost-effective
 
form
 
of
 
energy,
 
the
 
increasing
 
focus
 
on
renewable
 
energy
 
generation,
 
competition
 
from
 
alternative
 
fuel
 
sources,
 
such
 
as
 
natural
 
gas,
 
environmental
regulations and
 
the consequential
 
decline in
 
electricity generation
 
from fossil
 
fuels, is
 
expected to
 
result in
 
the
further decline
 
of coal-fired
 
electricity generation
 
due to
 
retirement of
 
coal-fired
 
capacity in
 
favor of
 
alternative
energy. The
 
low price of natural gas has resulted
 
in some U.S. electric power generators
 
increasing natural gas
consumption while decreasing coal consumption.
 
Further reductions in
 
the demand for
 
coal-fired electricity generation and
 
the growth of
 
alternative energy options,
such
 
as
 
renewables,
 
and
 
alternate
 
power
 
generation
 
technologies,
 
as
 
well
 
as
 
any
 
reduction
 
in
 
demand
 
for
electricity could materially reduce the demand for thermal coal, which may have a material adverse effect on our
financial condition and results of operations.
Economic, Competitive and Industry Risks
Our
 
business
 
may
 
be
 
adversely
 
affected
 
by
 
the
 
impact
 
on
 
the
 
global
 
economy
 
due
 
to,
 
among
 
other
events,
 
the
 
ongoing
 
military
 
conflict
 
between
 
Russia
 
and
 
Ukraine
 
or
 
other
 
significant
 
geopolitical
tensions.
Global
 
markets
 
are
 
experiencing
 
volatility
 
and
 
disruption
 
following
 
the
 
geopolitical
 
tensions
 
and
 
the
 
military
invasion of Ukraine
 
by Russia. This
 
military conflict
 
has led to,
 
and may lead
 
to additional,
 
sanctions and
 
other
penalties being
 
levied by
 
the United
 
States, the
 
European Union
 
and other
 
countries against
 
Russia, Belarus,
the Crimea Region
 
of Ukraine and
 
the two separatist
 
republics in the
 
Donetsk and Luhansk
 
regions of Ukraine,
including expansive bans on imports and exports of
 
products to and from Russia.
 
We are unable
 
to predict
 
the extent and
 
duration of the
 
ongoing military conflict,
 
which could lead
 
to further market
disruptions, including
 
significant volatility
 
in commodity
 
prices, including
 
the coal we
 
sell and
 
fuel we purchase,
instability in the
 
financial markets, higher inflation,
 
supply chain interruptions, political and
 
social instability as well
as an
 
increase in
 
cyberattacks and
 
espionage. Further, sanctions, and
 
any other
 
measures, as
 
well as
 
the existing
and potential
 
further responses from
 
Russia or
 
other countries
 
to such
 
sanctions, could adversely
 
affect the global
economy and financial markets, which
 
could in turn have
 
an adverse impact on
 
our financial condition and
 
results
of operations or heighten other risks described in this
 
Item 1A, “Risk Factors”.
Our
 
business,
 
financial
 
condition
 
and
 
results
 
of
 
operations
 
may
 
be
 
adversely
 
impacted
 
by
 
global
pandemics, including the COVID-19 pandemic, or other
 
widespread public health concerns.
Global pandemics, including the COVID-19
 
pandemic, or other widespread public
 
health concerns could have an
adverse effect on our business, financial condition
 
and results of operations.
 
International, federal, state and local public health and governmental authorities’ mandates in response to global
pandemics could require forced
 
shutdowns of our mines
 
and other facilities
 
in Australia and the
 
U.S. for extended
periods, restrict movement and the implementation of social distancing
 
protocols and restrict travelling overseas
or
 
across
 
borders
 
(including
 
interstate),
 
affecting
 
a
 
number
 
of
 
our
 
normal
 
business
 
practices
 
and
 
operations.
These
 
restrictions
 
could
 
cause
 
disruptions
 
to
 
mining
 
operations,
 
manufacturing
 
operations
 
and
 
supply
 
chains
around the world.
 
The
 
extent and duration
 
of the impact
 
that global pandemics, including
 
the COVID-19 pandemic,
 
and other public
health concerns could have in our business and results of operations will depend on numerous factors out of our
control that we may
 
not be able to
 
accurately predict and
 
could also heighten
 
other risks described
 
in this “Item
1A. Risk Factors” section, which could have a material adverse impact in our business and results of operations.
Our
 
profitability
 
depends
 
upon
 
the
 
prices we
 
receive
 
for our
 
coal.
 
Prices
 
for
 
coal are
 
volatile
 
and
 
can
fluctuate widely based upon a number of factors beyond
 
our control.
We generate
 
revenue from
 
the sale
 
of coal
 
and our
 
financial
 
results
 
are materially
 
impacted by
 
the prices
 
we
receive.
 
Prices
 
and
 
quantities
 
under
 
Met
 
coal
 
sales
 
contracts
 
in
 
North
 
America
 
are
 
generally
 
based
 
on
expectations
 
of
 
the
 
next
 
year’s
 
coal
 
prices
 
at
 
the
 
time
 
the
 
contract
 
is
 
entered
 
into,
 
renewed,
 
extended
 
or
re-opened. Pricing in the global seaborne market is typically set
 
on a rolling quarterly average benchmark price.
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
48
Sales by our
 
U.S. Operations to the
 
export market are
 
typically priced with reference
 
to a benchmark
 
index. Sales
by our Australian Operations have typically been contracted on an annual basis and are priced with reference
 
to
benchmark indices or bilaterally
 
negotiated term prices
 
and spot indices. As
 
a result, a significant
 
portion of our
revenue is
 
exposed to
 
movements in
 
coal prices
 
and any
 
weakening in
 
Met or
 
thermal coal
 
prices would
 
have
an adverse impact on our financial condition and results
 
of operations.
The expectation of future prices for coal depends upon many factors beyond our
 
control, including the following:
•
 
the current market price of coal;
•
 
overall domestic and global economic conditions,
 
including inflationary conditions and the supply
 
of and
demand for domestic and foreign coal, coke and steel;
•
 
the consumption pattern of industrial consumers, electricity generators
 
and residential users;
•
 
weather
 
conditions
 
in
 
our
 
markets
 
that
 
affect
 
the
 
ability
 
to
 
produce
 
Met
 
coal
 
or
 
affect
 
the
 
demand
 
for
thermal coal;
•
 
competition from other coal suppliers;
•
 
technological advances affecting the steel production
 
process and/or energy consumption;
•
 
the costs, availability and capacity of transportation infrastructure;
 
and
•
 
the impact
 
of domestic
 
and foreign
 
governmental policy,
 
laws and
 
regulations, including
 
the imposition
of tariffs, environmental
 
and climate change
 
regulations and
 
other regulations
 
affecting the
 
coal mining
industry,
 
including regulations and measures introduced in response
 
to the COVID-19 pandemic.
Met
 
coal
 
has
 
been
 
a
 
volatile
 
commodity
 
over
 
the
 
past
 
ten
 
years.
 
Recently,
 
in
 
the
 
second
 
quarter
 
of
 
2022,
seaborne prices reached record
 
levels with both the Australian
 
and U.S. Met coal
 
price indices exceeding $600
per Mt, largely as result of
 
supply concerns in key Met coal
 
markets and continued trade flow
 
disruptions due to
sanctions imposed
 
on Russia’s
 
coal imports
 
following Russian
 
invasion of
 
Ukraine. The
 
demand and
 
supply in
the Met
 
coal industry
 
changes from
 
time to
 
time. There
 
are no
 
assurances that
 
oversupply will
 
not occur,
 
that
demand will
 
not decrease
 
or that
 
overcapacity will
 
not occur,
 
which could
 
cause declines
 
in the
 
prices of
 
coal,
which could have a material adverse effect on
 
our financial condition and results of operations.
In addition, coal prices are highly
 
dependent on the outlook for coal consumption in
 
large Asian economies, such
as China, India, South Korea and Japan,
 
as well as any changes in government
 
policy regarding coal or energy
in those
 
countries.
 
Seaborne
 
Met coal
 
import
 
demand
 
can also
 
be significantly
 
impacted by
 
the
 
availability
 
of
local coal production, particularly in the leading Met coal import countries of China and India, among others, and
the
 
competitiveness
 
of
 
seaborne
 
Met
 
coal
 
supply,
 
including
 
from
 
the
 
leading
 
Met
 
coal
 
exporting
 
countries
 
of
Australia, the United States, Russia, Canada and Mongolia,
 
among others.
 
We face increasing competition, which could adversely
 
affect profitability.
Competition
 
in
 
the
 
coal
 
industry
 
is
 
based
 
on
 
many
 
factors,
 
including,
 
among
 
others,
 
world
 
supply,
 
price,
production
 
capacity,
 
coal
 
quality
 
and
 
characteristics,
 
transportation
 
capability
 
and
 
costs,
 
blending
 
capability,
brand name
 
and diversified
 
operations. We
 
are subject
 
to competition
 
from Met
 
coal producers
 
from Australia,
the United States, Russia, Canada, Mongolia and other Met coal producing countries.
 
Should those competitors
obtain a
 
competitive advantage in comparison
 
to us (whether
 
by way of
 
an increase in
 
production capacity, higher
realized
 
prices,
 
lower
 
operating
 
costs,
 
export/import
 
tariffs,
 
being
 
comparatively
 
less
 
impacted
 
as
 
a
 
result
 
of
global pandemics or otherwise),
 
such competitive advantage
 
may have an adverse
 
impact on our ability
 
to sell,
or the
 
prices at
 
which we
 
are able
 
to sell
 
coal
 
products.
 
In addition,
 
some of
 
our competitors
 
may have
 
more
production capacity as well as greater financial, marketing, distribution and other resources than we do and may
be subject to less stringent environmental and other regulations
 
than we are.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
49
The consolidation
 
of the global
 
Met coal industry
 
in recent years
 
has contributed
 
to increased competition,
 
and
our competitive
 
position may
 
be adversely
 
impacted by
 
further consolidation
 
among
 
market participants
 
or by
further
 
competitors
 
entering
 
into
 
and
 
exiting
 
bankruptcy
 
proceedings
 
under
 
a
 
lower
 
cost
 
structure.
 
Similarly,
potential
 
changes
 
to
 
international
 
trade
 
agreements,
 
trade
 
concessions
 
or
 
other
 
political
 
and
 
economic
arrangements may benefit
 
coal producers operating
 
in countries
 
other than the
 
United States and
 
Australia. Other
coal producers may also develop or acquire new projects to increase their coal production, which may adversely
impact our competitiveness. Some
 
of our global competitors
 
have significantly greater financial
 
resources, such
that increases in their coal production may affect domestic and foreign Met coal supply into the seaborne market
and associated prices and impact our ability to retain or
 
attract Met coal customers. In addition, our ability to ship
our Met coal to non-U.S.
 
and non-Australian customers
 
depends on port and transportation
 
capacity.
 
Increased
competition
 
within
 
the
 
Met
 
coal
 
industry
 
for
 
international
 
sales
 
could
 
result
 
in
 
us
 
not
 
being
 
able
 
to
 
obtain
throughput capacity at port facilities, as well as transport capacity, and could cause the rates for such services to
increase to a point where it is not economically feasible to export
 
our Met coal.
Increased competition, or a
 
failure to compete effectively,
 
in the markets in
 
which we participate
 
may result in a
loss of market share and could adversely affect our financial
 
condition and results of operations.
We may face restricted access to international markets
 
in the future.
Access to
 
international markets
 
may be
 
subject to
 
ongoing interruptions
 
and trade
 
barriers due
 
to policies
 
and
tariffs of individual
 
countries, and the
 
actions of certain
 
interest groups to
 
restrict the
 
import or export
 
of certain
commodities. For
 
example, the
 
current imposition
 
of tariffs
 
and import
 
quota restrictions
 
by China
 
on U.S.
 
and
Australian coal
 
imports respectively,
 
including the
 
ongoing suspension
 
of imports
 
of Australian
 
coal into
 
China,
may in
 
the future have
 
a negative impact
 
on our profitability. The timing
 
of any change
 
to these measures
 
remains
uncertain, and there can be no guarantee that other tariffs, import quota restrictions, bans or other trade barriers
will not be imposed (whether as a result of geopolitical tensions or for other
 
reasons), either by China or in other
markets for our products. We
 
may or may not be able to
 
access alternate markets for our
 
coal should additional
interruptions
 
and
 
trade
 
barriers
 
occur
 
in
 
the
 
future.
 
An
 
inability
 
for
 
Met
 
coal
 
suppliers
 
to
 
access
 
international
markets, including China, would likely
 
result in an oversupply of Met coal
 
and may result in a decrease in
 
prices
or the curtailment of production, which could
 
have a material adverse effect on our financial condition and
 
results
of operations.
If transportation
 
for our
 
coal becomes
 
unavailable or
 
uneconomic for
 
our customers,
 
our ability
 
to sell
coal could suffer.
Our mining operations produce coal, which is transported to customers by a combination of road, rail, barge and
ship. The
 
delivery of
 
coal produced
 
by our
 
mining operations
 
is subject
 
to potential
 
disruption and
 
competition
from other network users,
 
which may affect our
 
ability to deliver coal
 
to our customers and
 
may have an impact
on productivity and profitability.
 
Such disruptions to transportation services may include,
 
among others:
•
 
disruptions due to weather-related problems;
•
 
key equipment or infrastructure failures;
•
 
industrial action;
•
 
rail or port capacity congestion or constraints;
•
 
commercial disputes;
•
 
failure to
 
obtain consents
 
from third
 
parties for
 
access to
 
rail or
 
land, or
 
access being
 
removed
 
or not
granted by regulatory authorities;
•
 
changes in applicable regulations;
•
 
failure or delay in the construction of new rail or port capacity;
 
and
•
 
terrorist attacks, natural disasters, the
 
impact from global pandemics, including
 
the COVID-19 pandemic,
or other events.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
50
Any
 
such
 
disruptions,
 
or
 
any
 
deterioration
 
in
 
the
 
reliability
 
of
 
services
 
provided
 
by
 
our
 
transportation
 
service
providers, could
 
impair our
 
ability to
 
supply coal
 
to our
 
customers, result
 
in decreased
 
shipments and
 
revenue
and adversely affect our results of operations.
Typically,
 
we sell coal at the mine
 
gate and/or loaded into vessels at
 
the port. While ordinarily our coal
 
customers
arrange
 
and
 
pay
 
for
 
transportation
 
of
 
coal
 
from
 
the
 
mine
 
or
 
port
 
to
 
the
 
point
 
of
 
use,
 
we
 
have
 
entered
 
into
arrangements
 
with
 
third
 
parties
 
to
 
gain
 
access
 
to
 
transportation
 
infrastructure
 
and
 
services
 
where
 
required,
including road transport organizations, rail carriers and port owners. Where coal is exported or sold other than at
the mine gate, the costs associated with these arrangements represent a significant portion of both the total cost
of supplying
 
coal to
 
customers and
 
of our
 
production costs.
 
As a
 
result, the
 
cost of
 
transportation is
 
not only
 
a
key factor in our cost base, but also in the purchasing decision of customers. Transportation
 
costs may increase
and
 
we
 
may
 
not
 
be
 
able
 
to
 
pass
 
on
 
the
 
full
 
extent
 
of
 
cost
 
increases
 
to
 
our
 
customers.
 
For
 
example,
 
where
transportation
 
costs
 
are
 
connected
 
to
 
market
 
demand,
 
costs
 
may
 
increase
 
if
 
usage
 
by
 
us
 
and
 
other
 
market
participants increases. Significant
 
increases in transport
 
costs due to factors
 
such as fluctuations in
 
the price of
diesel fuel, electricity and demurrage or environmental requirements could make our coal less competitive when
compared to coal produced from other regions and countries. As the transportation capacity secured
 
by our port
and rail agreements is based
 
on assumed production volumes, we may
 
also have excess transportation capacity
(which, in the
 
case of take-or-pay
 
agreements, we may
 
have to pay
 
for even if
 
unused) if our
 
actual production
volumes are lower
 
than our estimated production
 
volumes. Conversely, we may not have sufficient transportation
capacity if our actual production volumes
 
exceed our estimated production volumes, if
 
we are unable to transport
the
 
full
 
capacity
 
due
 
to
 
contractual
 
limitations
 
or
 
if
 
any
 
deterioration
 
in
 
our
 
relationship
 
with
 
brokers
 
and
intermediaries results
 
in a
 
reduction in
 
the proportion
 
of coal
 
purchased FOR
 
from our
 
U.S. Operations
 
(and a
corresponding increase in the proportion of coal purchased FOB).
Take-or-pay arrangements within the
 
coal industry could unfavorably affect our profitability.
Our
 
Australian
 
Operations
 
generally
 
contract
 
port
 
and
 
rail
 
capacity
 
via
 
long-term
 
take-or-pay
 
contracts
 
for
transport, currently with
 
Aurizon Operations
 
Limited and Pacific
 
National Pty Ltd,
 
to and export
 
from the Port
 
of
Gladstone via two main port terminals, RGTCT and WICET.
 
At our U.S. Operations, we also have a take-or-pay
agreement in
 
connection
 
with the
 
Kinder Morgan
 
Pier IX
 
Terminal
 
in Hampton
 
Roads, Virginia.
 
We may
 
enter
into other take-or-pay arrangements in the future.
Where we have entered into take-or-pay contracts, we will generally be required to pay for our
 
contracted port or
rail capacity, even
 
if it
 
is not
 
utilized by
 
us or
 
other shippers. Although
 
the majority
 
of our
 
take-or-pay arrangements
provide security over minimum port and
 
rail infrastructure availability,
 
unused port or rail capacity can
 
arise as a
result
 
of
 
varying
 
unforeseen
 
circumstances,
 
including
 
insufficient
 
production
 
from
 
a
 
given
 
mine,
 
a
 
mismatch
between the timing of
 
required port and rail
 
capacity for a mine,
 
or an inability to
 
transfer the used capacity
 
due
to contractual limitations, such as
 
required consent of the provider of
 
the port or rail services,
 
or because the coal
must emanate from specified
 
source mines or
 
be loaded onto trains
 
at specified load
 
points. Paying for
 
unused
transport
 
capacity
 
could
 
materially
 
and
 
adversely
 
affect
 
our
 
cost
 
structures
 
and
 
financial
 
performance.
 
See
Item 7. “Management’s Discussion and
 
Analysis of Financial
 
Condition and Results of
 
Operations” for a
 
summary
of our expected future obligations under take-or-pay arrangements
 
as of December 31, 2022.
A decrease in
 
the availability
 
or increase
 
in costs of
 
key supplies, capital
 
equipment, commodities
 
and
purchased components,
 
such as
 
diesel fuel,
 
steel, explosives
 
and tires
 
could materially
 
and adversely
affect our financial condition and results of operations.
Our mining operations require a reliable
 
supply of large quantities of fuel,
 
explosives, tires, steel-related products
(including
 
roof
 
control
 
materials),
 
lubricants
 
and
 
electricity.
 
The
 
prices
 
we
 
pay
 
for
 
commodities
 
are
 
strongly
impacted by the global
 
market. In situations where
 
we have chosen to
 
concentrate a large portion
 
of purchases
with one supplier, it has been to take
 
advantage of cost savings from larger volumes of
 
purchases and to support
security of supply.
 
If the cost
 
of any of
 
these key supplies
 
or commodities increased
 
significantly,
 
or if a
 
source
for these supplies or mining equipment was unavailable to meet our replacement demands, including as a result
of the COVID-19 pandemic or
 
otherwise, our profitability could be reduced or
 
we could experience a delay or
 
halt
in our production.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
51
Prices
 
for equipment,
 
materials,
 
supplies
 
and employee
 
labor
 
contractor
 
services
 
increased during
 
2022,
 
and
could
 
continue
 
to
 
increase
 
in
 
2023
 
and
 
beyond.
 
Long-term
 
inflationary
 
pressures
 
may
 
result
 
in
 
such
 
prices
continuing to
 
increase
 
more quickly
 
than expected.
 
Inflation increases
 
costs for
 
materials, labor
 
and services,
and we
 
may be
 
unable to
 
secure these
 
resources on
 
economically acceptable
 
terms or
 
offset such
 
costs with
increased revenues, operating efficiencies,
 
or cost savings, which may adversely
 
impact our financial condition,
results of operations, liquidity,
 
and cash flows.
Our coal production and production costs can be materially and adversely impacted by unexpected shortages or
increases in the costs of consumables, spare parts,
 
plant and equipment. For example, operation
 
of the thermal
dryer located at
 
the CPP at
 
Buchanan is dependent
 
upon the delivery
 
of natural gas
 
and there is
 
currently only
one
 
natural
 
gas
 
supplier
 
in
 
the
 
area,
 
an
 
affiliate
 
of
 
CONSOL
 
Energy.
 
Although
 
we
 
have
 
entered
 
into
 
a
 
gas
purchase agreement with CONSOL Energy,
 
this agreement can be terminated by CONSOL
 
Energy on 30 days’
notice and any delay
 
or inability to negotiate
 
a replacement agreement
 
would impact our costs
 
of production as
we would need to change our processing method at Buchanan.
Defects in
 
title or
 
loss of
 
any leasehold
 
interests in
 
our properties
 
could limit
 
our ability
 
to mine
 
these
properties or result in significant unanticipated costs.
In Queensland,
 
where all
 
of our
 
Australian Operations
 
are carried
 
out, exploring
 
or mining
 
for coal
 
is unlawful
without a tenement granted by the Queensland
 
government. The grant and renewal of tenements
 
are subject to
a regulatory regime and each
 
tenement is subject to certain
 
conditions. There is no
 
certainty that an application
for the grant of a
 
new tenement or renewal
 
of one of the
 
existing Tenements
 
at Curragh will be
 
granted at all or
on
 
satisfactory
 
terms
 
or
 
within
 
expected
 
timeframes.
 
Further,
 
the
 
conditions
 
attached
 
to
 
the
 
Tenements
 
may
change at the time they are renewed. There is
 
a risk that we may lose title to
 
any of our granted Tenements if we
fail to comply with
 
the Tenement
 
conditions and other
 
applicable legislative requirements
 
(including payment of
State
 
royalties)
 
or
 
if
 
the
 
land
 
that
 
is
 
subject
 
to
 
the
 
title
 
is
 
required
 
for
 
public
 
purposes.
 
The
 
Tenements
 
have
expiration dates ranging from
 
May 31, 2023 to July
 
31, 2044 and, where renewal
 
is required, there is a
 
risk that
the Queensland government may change the terms and conditions
 
of such Tenement
 
upon renewal.
In
 
the
 
United
 
States,
 
title
 
to
 
a
 
leased
 
property
 
and
 
mineral
 
rights
 
is
 
generally
 
secured
 
prior
 
to
 
permitting
 
and
developing a property. In some cases,
 
we rely on title information or representations and warranties provided by
our lessors, grantors
 
or other third
 
parties. Our right
 
to mine some
 
of our reserves
 
may be adversely
 
affected if
defects in
 
title or
 
boundaries
 
exist or
 
if a
 
lease expires.
 
Any challenge
 
to our
 
title or
 
leasehold interests
 
could
delay the exploration and development of the property and could ultimately result in the loss of some
 
or all of our
interest in the property and, accordingly, require us to reduce our estimated coal
 
reserves. In addition, if we mine
on property that we do not
 
own or lease, we could incur
 
civil damages or liability for
 
such mining and be subject
to conversion, negligence,
 
trespass, regulatory sanction
 
and penalties. Some
 
leases have minimum
 
production
requirements or require us
 
to commence mining operations in
 
a specified term to
 
retain the lease. Failure
 
to meet
those requirements
 
could result
 
in losses of
 
prepaid royalties
 
and, in some
 
rare cases,
 
could result
 
in a loss
 
of
the lease itself.
In
 
the
 
United
 
States,
 
we
 
predominantly
 
access
 
our
 
mining
 
properties
 
through
 
leases
 
with
 
a
 
range
 
of
 
private
landholders.
 
If
 
a
 
default
 
under
 
a
 
lease
 
for
 
properties
 
on
 
which
 
we
 
have
 
mining
 
operations
 
resulted
 
in
 
the
termination of the
 
applicable lease,
 
we may have
 
to suspend
 
mining or significantly
 
alter the sequence
 
of such
mining operations, which may adversely affect our
 
future coal production and future revenues.
To
 
obtain
 
leases
 
or
 
mining
 
contracts
 
to
 
conduct
 
our
 
U.S.
 
Operations
 
on
 
properties
 
where
 
defects
 
exist
 
or
 
to
negotiate extensions or amendments
 
to existing leases, we
 
may in the future have
 
to incur unanticipated costs.
In addition, we may
 
not be able
 
to successfully negotiate new
 
leases or mining
 
contracts for properties containing
additional
 
reserves
 
or
 
maintain
 
our
 
leasehold
 
interests
 
in
 
properties
 
where
 
we
 
have
 
not
 
commenced
 
mining
operations during the term of the lease.
A defect in our title or the loss of any lease or Tenement
 
upon expiration of its term, upon a default or otherwise,
could adversely affect our ability to mine the
 
associated reserves or process the coal we mine.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
52
We may
 
be unable
 
to obtain,
 
renew or
 
maintain permits necessary
 
for our
 
operations, which
 
would reduce
coal production, cash flows and profitability.
Our performance
 
and
 
operations
 
depend
 
on, among
 
other things,
 
being able
 
to
 
obtain on
 
a timely
 
basis,
 
and
maintain,
 
all
 
necessary
 
regulatory
 
approvals,
 
including
 
any
 
approvals
 
arising
 
under
 
applicable
 
mining
 
laws,
environmental regulations and
 
other laws, for our
 
current operations, expansion
 
and growth projects. Examples
of regulatory
 
approvals that
 
we must
 
obtain and
 
maintain include
 
mine development
 
approvals, environmental
permits and, in
 
Australia, tenure and approvals
 
relating to native
 
title and indigenous cultural
 
heritage. In addition,
our operations depend
 
on our ability
 
to obtain and
 
maintain consents from private
 
land owners and
 
good relations
with local communities.
The requirement
 
to obtain
 
and maintain
 
approvals and
 
address potential
 
and actual
 
issues for
 
former,
 
existing
and future
 
mining
 
projects
 
is common
 
to all
 
companies
 
in the
 
coal sector.
 
However,
 
there is
 
no assurance
 
or
guarantee that we
 
will obtain,
 
secure, or be
 
able to maintain
 
any or all
 
of the required
 
consents, approvals
 
and
rights necessary to maintain our current
 
production profile from our existing
 
operations or to develop our
 
growth
projects
 
in a
 
manner
 
which
 
will result
 
in
 
profitable
 
mining
 
operations
 
and/or
 
achieve
 
our long-term
 
production
targets. The permitting rules, and
 
the interpretations of these rules,
 
are complex, change frequently and
 
are often
subject to the interpretation of the regulators that
 
enforce them, all of which may make compliance more
 
difficult
or impractical,
 
and may
 
possibly preclude
 
the continuance
 
of ongoing
 
operations or
 
the development
 
of future
mining operations. Certain
 
laws, such as
 
the SMCRA, require
 
that certain environmental
 
standards be met
 
before
a
 
permit
 
is
 
issued.
 
The
 
public,
 
including
 
non-governmental
 
organizations,
 
anti-mining
 
groups
 
and
 
individuals,
have certain
 
statutory
 
rights
 
to comment
 
upon and
 
submit
 
objections
 
to requested
 
permits and
 
environmental
impact statements.
 
These comments
 
are prepared
 
in connection
 
with applicable
 
regulatory processes,
 
and the
public may otherwise engage
 
in the permitting
 
process, including bringing
 
lawsuits to challenge the
 
issuance of
permits, the
 
validity or
 
adequacy of environmental
 
impact statements or
 
performance of mining
 
activities. In
 
states
where we operate, applicable
 
laws and regulations
 
also provide that
 
a mining permit
 
or modification can,
 
under
certain
 
circumstances,
 
be
 
delayed,
 
refused
 
or
 
revoked
 
if
 
we
 
or
 
any
 
entity
 
that
 
owns
 
or
 
controls
 
or
 
is
 
under
common
 
ownership
 
or
 
control
 
with
 
us
 
have
 
unabated
 
permit
 
violations
 
or
 
have
 
been
 
the
 
subject
 
of
 
permit
 
or
reclamation bond revocation or suspension. Thus, past or ongoing violations of federal and state
 
mining laws by
us or such entity could provide a basis
 
to revoke existing permits and to deny
 
the issuance of additional permits
or modification
 
or amendment
 
of existing
 
permits. In
 
recent years,
 
the
 
permitting
 
required for
 
coal mining
 
has
been the subject of increasingly stringent regulatory and
 
administrative requirements and extensive activism and
litigation
 
by
 
environmental
 
groups.
 
If
 
this
 
trend
 
continues,
 
it
 
could
 
materially
 
and
 
adversely
 
affect
 
our
 
mining
operations, development
 
and expansion
 
and cost
 
structures, the
 
transport of
 
coal and
 
our customers’
 
ability to
use coal produced
 
by our mines,
 
which, in turn,
 
could have
 
a material
 
adverse effect
 
on our financial
 
condition
and results of operation.
In particular,
 
certain of
 
our activities
 
require a
 
dredge and
 
fill permit
 
from the
 
USACE under
 
Section 404 of
 
the
CWA. In
 
recent years, the
 
Section 404 permitting
 
process has
 
been subject to
 
increasingly stringent
 
regulatory
and administrative
 
requirements
 
and a
 
series of
 
court challenges,
 
which have
 
resulted in
 
increased costs
 
and
delays in the permitting process. In addition, in 2015, the EPA and the USACE issued the CWR, under the CWA
that would
 
further expand
 
the circumstances
 
when a
 
Section 404 permit
 
is needed.
 
The CWR
 
is the
 
subject of
extensive ongoing litigation and
 
administrative proceedings, as
 
a result of which the
 
CWR has been enjoined
 
in
certain
 
states
 
(including
 
West
 
Virginia)
 
and
 
reinstated
 
in
 
others
 
(including
 
Virginia
 
and
 
Pennsylvania),
 
and
 
its
current and future impact on our operations are the subject of significant uncertainty. On April 21, 2020, the EPA
and the
 
USACE
 
published
 
the NWPR,
 
replacing
 
the
 
CWR. The
 
NWPR
 
revises
 
the definition
 
of
 
waters
 
of
 
the
United States
 
and replaces
 
the CWR.
 
The NWPR
 
shrinks the
 
agencies’ jurisdiction,
 
particularly as
 
it relates
 
to
tributaries and adjacent waters, such
 
as wetlands, that were previously
 
covered by the definition under
 
the CWR.
The NWPR
 
went into
 
effect
 
on June
 
22, 2020.
 
States and
 
environmental
 
groups have
 
filed challenges
 
to the
NWPR in various federal
 
district courts.
 
We cannot at this time
 
predict how this rule
 
will be enforced in
 
the future.
Additionally, we may rely on nationwide permits
 
under the CWA Section 404 program for
 
some of our operations.
These nationwide
 
permits
 
are issued
 
every
 
five years,
 
and the
 
2017
 
nationwide
 
permit
 
program
 
was
 
recently
reissued in
 
January
 
2017.
 
If we
 
are unable
 
to use
 
the nationwide
 
permits
 
and require
 
an individual
 
permit
 
for
certain work, that could delay operations.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
53
If we
 
are unable
 
to obtain
 
and maintain
 
the approvals,
 
consents and
 
rights required
 
for our
 
current and
 
future
operations, or
 
if we
 
obtain
 
approvals subject
 
to conditions
 
or limitations,
 
the
 
economic
 
viability of
 
the relevant
projects may be
 
adversely affected,
 
which may in
 
turn result in
 
the value of
 
the relevant assets
 
being impaired,
which could have a material adverse effect on
 
our financial condition and results of operations.
A
 
shortage
 
of
 
skilled
 
labor
 
in
 
the
 
mining
 
industry
 
could
 
pose
 
a
 
risk
 
to
 
achieving
 
improved
 
labor
productivity.
Efficient coal mining using modern techniques and equipment requires skilled laborers, preferably with at least a
year of experience and proficiency in multiple
 
mining tasks. Any reduced availability or future
 
shortage of skilled
labor
 
in
 
the
 
Australian
 
and
 
U.S.
 
mining
 
industries
 
(including,
 
but
 
not
 
limited
 
to,
 
ongoing
 
labor
 
shortage
 
at
 
the
Logan operations which has impacted production at our U.S. Operations and as
 
a result of the impact of COVID-
19 pandemic)
 
could result
 
in our
 
having
 
insufficient
 
personnel
 
to operate
 
our business,
 
or expand
 
production,
particularly in the event there
 
is an increase in the
 
demand for our coal, which
 
could adversely affect our financial
condition and results of operations.
The existence (or claimed existence) of native
 
title on land within our Australian tenements
 
may impose
restrictions on the construction of our expansion activities
 
and our continued operations.
In Australia,
 
mineral exploration
 
and mining
 
tenure
 
(and
 
many other
 
forms
 
of tenure
 
or interests
 
in
 
land)
 
may
cover land that is subject to
 
a claim for native title or
 
land where native title has already been
 
determined to exist.
Native title is the communal, group or individual rights and interests of Aboriginal or Torres Strait Islander people
in relation to their traditional land or waters. The existence
 
of native title in Australia is recognized and protected
in
 
accordance
 
with
 
the
 
Native
 
Title
 
Act
 
1993
 
(Cth),
 
or
 
the
 
Native
 
Title
 
Act,
 
and
 
legislation
 
in
 
each
 
State
 
and
Territory.
 
The common
 
law of Australia
 
recognizes a
 
form of
 
native title that,
 
in circumstances
 
where it has
 
not
been extinguished, reflects the entitlement of
 
the appropriate traditional owners to their
 
lands, in accordance with
their traditional law and custom.
If native title
 
is either determined
 
to exist or
 
there are
 
registered, but
 
undetermined, native
 
title claims
 
over any
part of the tenements
 
and native title
 
has not otherwise
 
been extinguished with
 
respect to that
 
part, we may
 
be
required to negotiate with, and pay compensation to, the native title holders for impairment, loss
 
or diminution or
other effect of the proposed activities
 
on their native title rights and
 
interests. Compensation obligations may also
arise pursuant
 
to agreements
 
with native
 
title claimants
 
or native
 
title holders
 
in relation
 
to any
 
tenements
 
we
acquire.
 
The
 
existence
 
of
 
native
 
title
 
or
 
a
 
registered
 
native
 
title
 
claim
 
may
 
preclude
 
or
 
delay
 
the
 
granting
 
of
exploration and mining tenements pending resolution of the statutory procedures
 
imposed by the Native Title Act
and considerable expenses may be incurred in negotiating
 
and resolving native title issues.
The risk of
 
unforeseen native
 
title claims also
 
could affect
 
existing operations
 
as well as
 
development projects.
Although native title will not prevent the exercise of any validly granted rights and interests under our tenements,
the Native Title
 
Act and applicable
 
State and Commonwealth
 
legislation, together
 
with the recognition
 
of native
title at common
 
law,
 
may impact
 
the continued
 
operations under
 
our tenements,
 
development projects
 
and the
construction of our expansion activities and/or give rise to
 
liability for compensation.
The Aboriginal Cultural
 
Heritage Act 2003
 
(Qld) and the
 
Torres
 
Strait Islander
 
Cultural Heritage
 
Act 2003 (Qld)
provide
 
a
 
framework
 
for
 
the
 
protection
 
of
 
Aboriginal
 
and
 
Torres
 
Strait
 
Islander
 
cultural
 
heritage.
 
The
 
main
mechanism through
 
which
 
each act
 
operates is
 
a list
 
of places
 
and artifacts
 
of heritage
 
significance. The
 
acts
also create
 
offenses
 
such
 
as breach
 
of the
 
cultural
 
heritage duty
 
of care.
 
This duty
 
of care
 
requires a
 
person
carrying
 
out
 
an
 
activity
 
to
 
take
 
all reasonable
 
and
 
practicable
 
measures
 
to
 
ensure
 
the
 
activity
 
does
 
not
 
harm
Aboriginal cultural heritage.
In addition, it may also be necessary for
 
us to enter into separate arrangements with the
 
traditional owners of the
sites.
 
This
 
could
 
be
 
costly
 
for
 
us
 
and
 
potentially
 
cause
 
delays
 
in
 
our
 
continued
 
operational
 
and
 
expansion
activities.
Although
 
the
 
failure
 
to
 
resolve
 
any
 
issues
 
associated
 
with
 
sites
 
of
 
indigenous
 
heritage
 
significance
 
could
adversely impact our expansion activities and our continuing operations, there are no
 
such current or anticipated
issues.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
54
Operational and Technology
 
Risks
Risks inherent to mining operations could impact the amount of coal produced,
 
cause delay or suspend
coal deliveries, or increase the cost of operating our
 
business.
Our
 
mining
 
operations,
 
including
 
exploration,
 
development,
 
preparation,
 
product
 
handling
 
and
 
accessing
transport infrastructure,
 
may be affected
 
by various operational
 
difficulties that
 
could impact the
 
amount of coal
produced at our coal mines, cause
 
delay or suspend coal deliveries, or increase
 
the cost of mining for a varying
length of time.
 
Our financial performance
 
is dependent
 
on our ability
 
to sustain or
 
increase coal production
 
and
maintain or increase operating margins. Our coal production and production costs are,
 
in many respects, subject
to conditions and events beyond our control, which could disrupt our operations and
 
have a significant impact on
our financial results. Adverse operating conditions and
 
events that we may have experienced in the past or
 
may
experience in the future include:
•
 
a failure to achieve the Met coal qualities or quantities
 
anticipated from exploration activities;
•
 
variations in
 
mining and
 
geological
 
conditions from
 
those anticipated,
 
such as
 
variations in
 
coal seam
thickness and quality,
 
and geotechnical conclusions;
•
 
operational and technical
 
difficulties encountered in mining,
 
including equipment failure,
 
delays in moving
longwall equipment, drag-lines and other equipment and maintenance
 
or technical issues;
•
 
adverse weather conditions
 
or natural or
 
man-made disasters, including
 
hurricanes, cyclones, tornadoes,
floods, droughts, bush
 
fires, seismic activities,
 
ground failures, rock
 
bursts, structural cave-ins
 
or slides
and other
 
catastrophic events
 
(such as
 
the COVID-19
 
pandemic that
 
has caused
 
significant disruption
across nearly
 
all industries
 
and markets,
 
including global
 
supply chain
 
shortages, the
 
impact of
 
which,
continues to be uncertain);
•
 
insufficient or unreliable infrastructure, such as power,
 
water and transport;
•
 
industrial and
 
environmental accidents,
 
such as
 
releases of
 
mine-affected water
 
and diesel
 
spills (both
of which have affected our Australian Operations
 
in the past);
•
 
industrial disputes and labor shortages;
•
 
mine safety accidents, including fatalities, fires and explosions
 
from methane and other sources;
•
 
competition
 
and
 
conflicts
 
with
 
other
 
natural
 
resource
 
extraction
 
and
 
production
 
activities
 
within
overlapping operating areas, such as natural gas extraction
 
or oil and gas development;
•
 
unexpected shortages, or increases in the costs, of consumables,
 
spare parts, plant and equipment;
•
 
cyber-attacks
 
that
 
disrupt
 
our
 
operations
 
or
 
result
 
in
 
the
 
dissemination
 
of
 
proprietary
 
or
 
confidential
information about us to our customers or other third
 
parties; and
•
 
security breaches or terrorist acts.
If any
 
of the
 
foregoing conditions
 
or events
 
occurs and
 
is not
 
mitigated or
 
excusable as
 
a force
 
majeure event
under
 
our
 
coal
 
sales
 
contracts,
 
any
 
resulting
 
failure
 
on
 
our
 
part
 
to
 
deliver
 
coal
 
to
 
the
 
purchaser
 
under
 
such
contracts
 
could
 
result
 
in
 
economic
 
penalties,
 
demurrage
 
costs,
 
suspension
 
or
 
cancellation
 
of
 
shipments
 
or
ultimately termination
 
of such
 
contracts, which
 
could
 
have a
 
material adverse
 
effect
 
on our
 
financial condition
and results of operations.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
55
Our U.S.
 
Operations are
 
concentrated in
 
a small
 
number of
 
mines in
 
the CAPP
 
and our
 
Australian Operations
include one
 
mine in
 
the Bowen
 
Basin of
 
Australia. As
 
a result,
 
the effects
 
of any
 
of these
 
conditions or
 
events
may be exacerbated and may have a disproportionate
 
impact on our results of operations and assets. Any such
operational
 
conditions
 
or
 
events
 
could
 
also
 
result
 
in
 
disruption
 
to
 
key
 
infrastructure
 
(including
 
infrastructure
located at or serving our mining activities, as well as the infrastructure that
 
supports freight and logistics). These
conditions and events could
 
also result in the
 
partial or complete closure
 
of particular railways, ports or
 
significant
inland waterways
 
or sea
 
passages, potentially
 
resulting in
 
higher costs,
 
congestion, delays
 
or cancellations
 
on
some
 
transport
 
routes.
 
Any
 
of
 
these
 
conditions
 
or
 
events
 
could
 
adversely
 
impact
 
our
 
business
 
and
 
results
 
of
operations.
Our long-term
 
success depends
 
upon our
 
ability to
 
continue discovering,
 
or acquiring
 
and developing
assets containing, coal reserves that are economically
 
recoverable.
Our recoverable reserves decline
 
as we produce coal.
 
Our long-term outlook depends
 
on our ability to maintain
a commercially viable portfolio of coal reserves that are economically recoverable. Failure to acquire or discover
new coal reserves or
 
develop new assets could
 
negatively affect our financial condition and
 
results of operations.
Exploration activity may occur adjacent to established
 
assets and in new regions. These activities
 
may increase
land tenure,
 
infrastructure
 
and related
 
political risks.
 
Failure to
 
discover or
 
acquire new
 
coal reserves,
 
replace
coal reserves or develop new assets or operations in sufficient quantities to maintain or grow the
 
current level of
reserves could negatively affect our financial condition
 
and results of operations.
Potential changes to our portfolio of assets through acquisitions and divestments may have an adverse effect on
future results
 
of operations
 
and financial
 
condition. From
 
time to
 
time, we
 
may add
 
assets to,
 
or divest
 
assets
from, our portfolio. There are a number of risks associated with historical
 
and future acquisitions or divestments,
including, among others:
•
 
adverse market
 
reaction to
 
such acquisitions
 
and divestments
 
or the
 
timing or
 
terms on
 
which acquisitions
and divestments are made;
•
 
imposition of adverse regulatory conditions and obligations;
•
 
political and country risk;
•
 
commercial objectives not being achieved as expected;
•
 
unforeseen liabilities arising from changes to the portfolio;
•
 
sales revenues and operational performance not meeting
 
expectations;
•
 
anticipated synergies or cost savings being delayed or not
 
being achieved; and
•
 
inability to retain key staff and transaction-related costs
 
being more than anticipated.
These factors could materially and adversely affect
 
our financial condition and results of operations.
We rely
 
on estimates
 
of our
 
recoverable resources
 
and reserves,
 
which are
 
complex due
 
to geological
characteristics of the properties and the number of
 
assumptions made.
We rely on estimates of our recoverable resources and reserves.
 
In this Annual Report on Form 10-K, we report
our estimated resources
 
and reserves in
 
accordance with
 
subpart 1300
 
of Regulation S-K
 
under the Exchange
Act. See Item
 
2. “Properties.”
 
Subpart 1300 of
 
Regulation S-K requires
 
us to disclose
 
our mineral resources,
 
in
addition to
 
our mineral reserves.
 
In addition,
 
as an
 
ASX-listed company, our ASX disclosures
 
follow the Australian
Code
 
for
 
Reporting
 
of
 
Exploration
 
Results,
 
Mineral
 
Resources
 
and
 
Ore
 
Reserves
 
2012,
 
or
 
the
 
JORC
 
Code.
Accordingly,
 
our estimates
 
of resources
 
and reserves
 
in this
 
Annual Report
 
on Form
 
10-K and
 
in other
 
reports
that
 
we
 
are
 
required
 
to
 
file
 
with
 
the
 
SEC
 
may
 
be
 
different
 
than
 
our
 
estimates
 
of
 
resources
 
and
 
reserves
 
as
reported in our ASX disclosures.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
56
Coal
 
is
 
economically
 
recoverable
 
when
 
the
 
price
 
at
 
which
 
it
 
can
 
be
 
sold
 
exceeds
 
the
 
costs
 
and
 
expenses
 
of
mining
 
and
 
selling
 
the
 
coal.
 
The
 
costs
 
and
 
expenses
 
of
 
mining
 
and
 
selling
 
the
 
coal
 
are
 
determined
 
on
 
a
mine-by-mine basis, and as a result, the price at which our coal is economically recoverable varies based on the
mine. We
 
base our resource
 
and reserve
 
information on geologic
 
data, coal ownership
 
information and current
and
 
proposed
 
mine
 
plans,
 
and
 
mining
 
cost
 
assumptions
 
may
 
be
 
affected
 
by
 
changes
 
in
 
mine
 
planning
 
or
scheduling over
 
time. There
 
are numerous
 
uncertainties
 
inherent in
 
estimating
 
quantities
 
and qualities
 
of coal
and
 
costs
 
to
 
mine
 
recoverable
 
reserves,
 
including
 
many
 
factors
 
beyond
 
our
 
control.
 
There
 
are
 
inherent
uncertainties and risks associated with such estimates, including:
•
 
geologic and mining conditions,
 
which may not be
 
fully identified by available
 
exploration data and may
differ from our experience and assumptions in areas
 
we currently mine;
•
 
current
 
and
 
future
 
market
 
prices
 
for
 
coal,
 
contractual
 
arrangements,
 
operating
 
costs
 
and
 
capital
expenditures;
•
 
severance and
 
excise
 
taxes,
 
unexpected
 
governmental
 
taxes, royalties
 
,
 
stamp
 
duty and
 
development
and reclamation costs;
•
 
future mining technology improvements;
•
 
the effects of regulation by governmental agencies;
•
 
the ability to obtain, maintain and renew all required permits;
•
 
employee health and safety; and
•
 
historical production from the area compared with production from
 
other producing areas.
Except
 
for
 
that
 
portion
 
of
 
mineral
 
resources
 
classified
 
as
 
mineral
 
reserves,
 
mineral
 
resources
 
do
 
not
 
have
demonstrated economic value. Even
 
if a mineral
 
resource exists, there can
 
be no assurance that
 
any part of
 
such
mineral resource will ever be converted to mineral reserves.
In addition, estimates of coal resources and reserves are revised based on actual production experience, and/or
new exploration
 
information and therefore
 
the estimates
 
of coal resources
 
and reserves
 
are subject to
 
change.
Should we
 
encounter geological
 
conditions or
 
qualities different
 
from those
 
predicted by
 
past drilling,
 
sampling
and similar examinations, estimates
 
of coal resources and reserves
 
may have to be adjusted
 
and mining plans,
coal processing and infrastructure may have to be
 
altered in a way that might adversely affect our
 
operations. As
a result, our estimates may not accurately reflect our actual future coal
 
resources and reserves.
As
 
a
 
result,
 
the
 
quantity
 
and
 
quality
 
of
 
the
 
coal
 
that
 
we
 
recover
 
may
 
be
 
less
 
than
 
the
 
resource
 
and
 
reserve
estimates included in
 
this Annual Report
 
on Form 10-K.
 
If our actual coal
 
resources and reserves
 
are less than
current estimates,
 
or the
 
rate at
 
which they
 
are recovered
 
is less
 
than estimated
 
or results
 
in higher
 
than estimated
cost, our financial condition and results of operations may
 
be materially adversely affected.
Our
 
profitability
 
could
 
be
 
affected
 
adversely
 
by
 
the
 
failure
 
of
 
suppliers
 
and/or
 
outside
 
contractors
 
to
perform.
We use
 
contractors and
 
other third
 
parties for
 
exploration, mining
 
and other
 
services generally,
 
and are
 
reliant
on several
 
third parties
 
for the
 
success of
 
our current
 
operations and
 
the development
 
of our
 
growth projects.
While
 
this
 
is normal
 
for
 
the
 
mining
 
industry,
 
problems
 
caused
 
by third
 
parties
 
may arise,
 
which
 
may
 
have
 
an
impact on our performance and operations. In particular, the majority of workers at our
 
Australian Operations are
employed by contractors, including Thiess Pty Ltd, Golding
 
Contractors Pty Ltd, and Wolff Mining
 
Pty Ltd.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
57
Operations
 
at
 
our
 
mines
 
may
 
be
 
interrupted
 
for
 
an
 
extended
 
period
 
in
 
the
 
event
 
that
 
we
 
lose
 
any
 
of
 
our
 
key
contractors (because their
 
contract is terminated or
 
expires) and are required
 
to replace them. There
 
can be no
assurance that skilled third parties or
 
contractors will continue to be
 
available at reasonable rates.
 
As we do not
have the
 
same control
 
over contractors
 
as we
 
do over
 
employees, we
 
are also
 
exposed to
 
risks related
 
to the
quality or
 
continuation of
 
the services
 
of, and
 
the equipment
 
and supplies
 
used by,
 
our contractors,
 
as well
 
as
risks related
 
to the
 
compliance of our
 
contractors with environmental
 
and health and
 
safety legislation and
 
internal
policies, standards and
 
processes. Any failure
 
by our key
 
contractors to comply
 
with their obligations
 
under our
operating agreements with
 
them (whether as a
 
result of financial, safety
 
or operational difficulties
 
or otherwise),
any
 
termination
 
or
 
breach
 
of
 
our
 
operating
 
agreements
 
by
 
our
 
contractors,
 
any
 
protracted
 
dispute
 
with
 
a
contractor,
 
any inability
 
to perform
 
due to
 
global pandemics
 
or other
 
health concerns,
 
including the
 
COVID-19
pandemic,
 
any material labor dispute between our contractors and their employees or any major labor action by
those employees
 
against
 
our
 
contractors,
 
could
 
have
 
a material
 
adverse
 
effect
 
on
 
our financial
 
condition
 
and
results of operations.
Further, in
 
periods of high
 
commodity prices, demand
 
for contractors may
 
exceed supply resulting
 
in increased
costs or lack
 
of availability
 
of key contractors.
 
Disruptions of
 
operations or
 
increased costs also
 
can occur as
 
a
result of disputes with contractors or a shortage
 
of contractors with particular capabilities. To
 
the extent that any
of the foregoing risks were to materialize, our operating
 
results and cash flows could be adversely affected.
Our inability to replace or
 
repair damaged or destroyed
 
equipment or facilities in
 
a timely manner could
materially and adversely affect our financial condition
 
and results of operations.
We depend on several
 
major pieces of mining
 
equipment and facilities to
 
produce and transport coal,
 
including,
but
 
not
 
limited
 
to,
 
longwall
 
mining
 
systems,
 
continuous
 
miners,
 
draglines,
 
dozers,
 
excavators,
 
shovels,
 
haul
trucks, conveyors,
 
CPPs and
 
rail loading
 
and blending
 
facilities. Obtaining
 
and repairing
 
these major
 
pieces of
equipment often involves long lead
 
times. If any of these
 
pieces of equipment and facilities suffers major
 
damage
or is destroyed by fire,
 
abnormal wear and tear,
 
flooding, incorrect operation or
 
otherwise, we may be unable
 
to
replace or repair them in a timely manner or at a reasonable cost, which would impact our ability
 
to produce and
transport
 
coal
 
and
 
could
 
materially
 
and
 
adversely
 
affect
 
our financial
 
condition
 
and
 
results
 
of
 
operations.
 
Our
ability to replace or
 
repair damaged or destroyed
 
equipment or facilities
 
may also be dependent
 
on suppliers or
manufacturers remaining operational and having the relevant equipment, work force or services available for us.
Suppliers
 
and
 
manufacturers
 
may be
 
unable
 
to
 
provide
 
such
 
equipment,
 
work
 
force
 
or service
 
for
 
a
 
range
 
of
reasons,
 
including
 
but
 
not
 
limited
 
to
 
their
 
business
 
suffering
 
adverse
 
effects
 
as
 
a
 
result
 
of
 
global
 
pandemics,
including the COVID-19 pandemic.
 
Additionally, regulatory agencies sometimes make changes with regard to requirements for pieces of
 
equipment.
Such changes can impose costs on us and can cause delays if manufacturers and suppliers are unable to make
the required changes in compliance with mandated deadlines.
Our
 
ability to
 
operate effectively
 
could
 
be impaired
 
if we
 
lose key
 
personnel
 
or fail
 
to
 
attract qualified
personnel.
The loss of key personnel and the failure to recruit sufficiently qualified staff
 
could affect our future performance.
We have entered into employment
 
contracts with a number of
 
key personnel in Australia
 
and the United States,
including
 
our
 
Managing
 
Director
 
and
 
Chief
 
Executive
 
Officer,
 
Garold
 
Spindler,
 
our
 
Chief
 
Operating
 
Officer,
Australia, Douglas
 
Thompson,
 
our Group
 
Chief Financial
 
Officer,
 
Gerhard
 
Ziems,
 
and Chief
 
Operating
 
Officer
U.S., Jeffrey Bitzer. On January 17, 2023,
 
Coronado announced that Mr. Spindler will retire from
 
his role as Chief
Executive Officer
 
and transition
 
to the
 
position of
 
Executive Chair
 
of the
 
Board of
 
Directors, and
 
the Company
also announced that Mr.
 
Thompson will be appointed as Chief
 
Executive Officer of the Company.
 
Mr. Spindler’s
and Mr.
 
Thompson’s new
 
positions will be
 
effective immediately
 
following the Company’s
 
2023 Annual General
Meeting of Stockholders.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
58
Mr. Spindler’s, Mr.
 
Thompson’s,
 
Mr. Ziems’ and
 
Mr. Bitzer’s expertise and
 
experience in the mining industry
 
are
important to the
 
continued development
 
and operation
 
of our mining
 
interests. However,
 
there is
 
no assurance
that such personnel
 
will remain with
 
us for the
 
term of their
 
employment contracts or beyond.
 
In the United
 
States,
we have not
 
entered into
 
employment contracts
 
with any
 
of our key
 
personnel (other
 
than Mr.
 
Spindler and
 
his
direct reports), meaning that we do
 
not have the benefit of notice
 
provisions or non-compete restraints with these
employees. There
 
may be
 
a limited
 
number of
 
persons with
 
the requisite
 
experience and
 
skills to
 
serve in
 
our
senior management positions. We may not be
 
able to locate or employ
 
qualified executives on acceptable terms.
In addition, as our business develops and
 
expands, we believe that our future
 
success will depend greatly on our
continued ability
 
to attract and
 
retain highly
 
skilled personnel
 
with coal
 
industry experience
 
in Australia
 
and the
United States. We may not be able to continue to employ key
 
personnel or attract and retain qualified personnel
in the future.
 
The loss of
 
such key
 
personnel or
 
the failure to
 
recruit sufficiently
 
qualified employees
 
may affect
our business and future performance.
We may not have adequate insurance coverage
 
for some business risks.
We have insurance coverage for certain
 
operating risks that provide limited coverage
 
for some potential liabilities
associated with our
 
business. As
 
a result of
 
market conditions, premiums
 
and deductibles for
 
certain insurance
policies
 
can
 
increase
 
substantially,
 
and
 
in
 
some
 
instances,
 
certain
 
insurance
 
may
 
become
 
unavailable
 
or
available only for reduced amounts of coverage. As a result, we may not be able
 
to renew our existing insurance
policies or
 
procure
 
other
 
desirable
 
insurance
 
on commercially
 
reasonable
 
terms,
 
if at
 
all. In
 
addition,
 
we
 
may
become subject
 
to liability
 
(including in
 
relation to
 
pollution, occupational
 
illnesses
 
or other
 
hazards),
 
or suffer
loss resulting from
 
business interruption, for
 
which we are
 
not insured (or
 
are not sufficiently
 
insured) or cannot
insure, including liabilities in respect of past activities.
Should we suffer a major
 
uninsured loss, future financial
 
performance could be materially
 
adversely affected. In
addition, insurance may not
 
continue to be available
 
at economically acceptable
 
premiums or coverage may
 
be
reduced. As
 
a result,
 
the insurance
 
coverage
 
may not
 
cover the
 
full scope
 
and extent
 
of claims
 
against us
 
or
losses we
 
may incur.
 
The occurrence
 
of a
 
significant
 
adverse event
 
not fully
 
or partially
 
covered by
 
insurance
could have a material adverse effect on our financial
 
condition and results of operations.
Cybersecurity
 
attacks,
 
natural
 
disasters,
 
terrorist
 
attacks
 
and
 
other
 
similar
 
crises
 
or
 
disruptions
 
may
negatively affect our business, financial condition
 
and results of operations.
Our
 
business
 
may
 
be
 
impacted
 
by
 
disruptions
 
such
 
as
 
cybersecurity
 
attacks
 
or
 
failures,
 
threats
 
to
 
physical
security,
 
and
 
extreme
 
weather
 
conditions
 
or other
 
natural disasters.
 
Strategic
 
targets,
 
such
 
as energy-related
assets, may be
 
at greater risk
 
of future terrorist
 
or cybersecurity attacks
 
than other targets
 
in the United
 
States
or
 
Australia.
 
These
 
disruptions
 
or
 
any
 
significant
 
increases
 
in
 
energy
 
prices
 
that
 
follow
 
could
 
result
 
in
government-imposed price
 
controls. Our
 
insurance may
 
not protect
 
us against
 
such occurrences.
 
It is
 
possible
that any of these
 
occurrences, or a
 
combination of them,
 
could have a material
 
adverse effect on
 
our business,
financial condition and results of operations.
In addition, a disruption in,
 
or failure of, our information
 
technology systems could adversely affect
 
our business
operations
 
and
 
financial
 
performance.
 
We
 
rely
 
on
 
the
 
accuracy,
 
capacity
 
and
 
security
 
of
 
our
 
information
technology,
 
or IT,
 
systems for the operations
 
of many of our
 
business processes and to
 
comply with regulatory,
legal and tax
 
requirements. While
 
we maintain
 
some of
 
our critical IT
 
systems, we
 
are also dependent
 
on third
parties
 
to
 
provide
 
important
 
IT
 
services
 
relating
 
to,
 
among
 
other
 
things,
 
human
 
resources,
 
electronic
communications
 
and
 
certain
 
finance
 
functions.
 
Despite
 
the
 
security
 
measures
 
that
 
we
 
have
 
implemented,
including those
 
related to cybersecurity, our systems
 
could be breached
 
or damaged by
 
computer viruses, natural
or man-made
 
incidents or
 
disasters or
 
unauthorized physical
 
or electronic
 
access. Though
 
we have
 
controls in
place, we cannot provide assurance that a cyber-attack
 
will not occur.
 
Furthermore, we may
 
have little or
 
no oversight with
 
respect to security
 
measures employed by
 
third-party service
providers, which may ultimately prove to be ineffective at countering threats. Failures of our IT systems, whether
caused
 
maliciously
 
or inadvertently,
 
may
 
result
 
in
 
the
 
disruption
 
of
 
our
 
business
 
processes,
 
the
 
unauthorized
release
 
of
 
sensitive,
 
confidential
 
or
 
otherwise
 
protected
 
information
 
or
 
the
 
corruption
 
of
 
data,
 
which
 
could
adversely affect our
 
business operations and
 
financial performance. We may
 
be required to
 
incur significant costs
to protect against and remediate the damage caused by
 
such disruptions or system failures in the future.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
59
Mining in the
 
CAPP is more
 
complex and involves
 
more regulatory constraints than
 
mining in other areas
of the U.S., which could affect our mining operations
 
and cost structures in these areas.
Mining in the CAPP is more
 
complex and involves more
 
regulatory constraints than mining
 
in other areas of the
United
 
States,
 
which
 
could
 
affect
 
our
 
mining
 
operations
 
and
 
cost
 
structures
 
in
 
these
 
areas.
 
The
 
geological
characteristics of coal reserves in the CAPP,
 
such as depth of overburden and coal seam thickness, make them
complex
 
and
 
costly
 
to
 
mine.
 
As
 
mines
 
become
 
depleted,
 
replacement
 
reserves
 
may
 
not
 
be
 
available
 
or,
 
if
available, may not
 
be able
 
to be
 
mined at
 
costs comparable to
 
those of
 
the depleting mines.
 
In addition, compared
to mines
 
in the
 
other areas
 
of the
 
United States,
 
permitting,
 
licensing and
 
other
 
environmental
 
and regulatory
requirements are more costly and time
 
consuming to satisfy.
 
These factors could materially adversely
 
affect the
mining operations
 
and cost
 
structures of,
 
and our
 
customers’ ability
 
to use
 
coal produced
 
by, our mining properties
in the CAPP.
Financial and Strategic Risks
The loss
 
of, or
 
significant reduction
 
in, purchases
 
by our
 
largest customers
 
could adversely
 
affect our
revenues.
For the
 
year ended
 
December 31,
 
2022, our
 
top ten
 
customers comprised
 
73.1%
of our
 
total revenue
 
and our
top five customers comprised
 
52.6%
of our total revenue. For the year ended December 31, 2022,
 
sales to Tata
Steel and Xcoal represented
 
19.4%
and 11.7%,
respectively,
 
of our total revenue.
 
The majority of our sales
 
are
made on
 
a spot
 
basis or
 
under contracts
 
with terms
 
of typically
 
one year. The
 
failure to
 
obtain additional
 
customers
or
 
the
 
loss
 
of
 
all
 
or
 
a
 
portion
 
of
 
the
 
revenues
 
attributable
 
to
 
any
 
customer
 
as
 
a
 
result
 
of
 
competition,
creditworthiness,
 
inability
 
to
 
negotiate
 
extensions,
 
replacement
 
of
 
contracts
 
or
 
the
 
impact
 
of
 
the
 
global
pandemics,
 
including
 
the
 
COVID-19
 
pandemic,
 
or
 
otherwise,
 
may
 
adversely
 
affect
 
our
 
business,
 
financial
condition and results of operations.
If a substantial number
 
of our customers fail
 
to perform under our
 
contracts with them, our revenues
 
and
operating profits could suffer.
A significant portion of the sales of our Met coal is to
 
customers with whom we have had long-term relationships.
The success of our business depends on our
 
ability to retain our current customers, renew our existing customer
contracts
 
and
 
solicit
 
new
 
customers.
 
Our
 
ability
 
to
 
do
 
so
 
generally
 
depends
 
on
 
a
 
variety
 
of
 
factors,
 
including
having our mines
 
operational, having the type
 
and quantity of
 
coal available, the quality
 
and price of
 
our products,
our ability to market these products effectively, our ability to deliver on a timely basis and the level of competition
that we face.
In addition, our
 
sales contracts
 
generally contain
 
provisions that
 
allow customers
 
to suspend or
 
terminate if
 
we
commit a material breach of the terms of the contract, a change in law
 
restricts or prohibits a party from carrying
out its
 
material obligations
 
under the
 
contract or
 
a material
 
adverse change
 
occurs in
 
our financial
 
standing or
creditworthiness. If customers suspend
 
or terminate existing contracts,
 
or otherwise refuse to accept
 
shipments
of our Met
 
coal for which
 
they have an
 
existing contractual
 
obligation, our revenues
 
will decrease, and
 
we may
have to reduce production at our mines until our customers’
 
contractual obligations are honored.
If our customers do not
 
honor contract commitments,
 
or if they terminate agreements
 
or exercise force majeure
provisions
 
allowing
 
for
 
the
 
temporary
 
suspension
 
of
 
performance
 
during
 
specified
 
events
 
beyond
 
the
 
parties’
control, including the COVID-19 pandemic and we are unable to replace the contract, our financial condition and
results of operations could be materially and adversely affected.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
60
If our ability
 
to collect
 
payments from
 
customers is
 
impaired, our
 
revenues and
 
operating profits
 
could
suffer.
Our
 
ability
 
to
 
receive
 
payment
 
for
 
coal
 
sold
 
and
 
delivered
 
will
 
depend
 
on
 
the
 
continued
 
creditworthiness
 
and
contractual performance of our customers and counterparties. For certain customers, we require the provision of
a letter of credit as
 
security for payment. The inability of key customers
 
to procure letters of credit (due
 
to general
economic conditions or the
 
specific circumstances of the
 
customer) may restrict our
 
ability to contract with such
customers or result in fewer sales contracts being executed, which could materially adversely affect our financial
condition and results of operations. For certain of our large customers
 
in Australia who have not provided letters
of
 
credit
 
or
 
other
 
form
 
of
 
security,
 
we
 
maintain
 
an
 
insurance
 
policy
 
to
 
cover
 
for
 
any
 
failure
 
in
 
payment.
 
This
insurance coverage, however,
 
may not cover the full scope
 
and extent of losses we
 
may incur as the result
 
of a
payment default or otherwise.
 
If a customer
 
does not
 
pay amounts
 
due in
 
a timely
 
manner,
 
we may
 
decide to sell
 
the customer’s coal
 
on the
spot market, which may be
 
at prices lower than the contracted
 
price, or we may be unable
 
to sell the coal at all.
If our customers’ or counterparties’ creditworthiness deteriorates,
 
our business could be adversely affected.
 
Changes in credit
 
ratings issued by
 
nationally recognized statistical
 
rating organizations could
 
adversely
affect our cost of financing and the market price
 
of our securities.
 
Credit rating agencies
 
could downgrade our ratings
 
due to factors specific
 
to our business,
 
a prolonged cyclical
downturn in the
 
mining industry or
 
macroeconomic trends
 
(such as global
 
or regional recessions)
 
and trends in
credit and
 
capital markets
 
more generally.
 
Any decline
 
in our credit
 
ratings would
 
likely result
 
in an
 
increase to
our cost of financing, limit our access to the capital markets, significantly harm our financial condition and results
of operations,
 
hinder
 
our ability
 
to refinance
 
existing
 
indebtedness
 
on
 
acceptable
 
terms
 
and
 
have an
 
adverse
effect on the market price of our securities.
Our existing and future indebtedness may limit cash flow available to invest in the ongoing needs of our
businesses, which could
 
prevent us
 
from fulfilling our
 
obligations under our
 
senior secured notes,
 
senior
secured asset-based revolving
 
credit agreement in
 
an initial
 
aggregate principal amount
 
of $100.0
 
million,
or the ABL Facility,
 
and other debt, and we may be forced to take other actions to satisfy our obligations
under our debt, which may not be successful.
As
 
of
 
December
 
31,
 
2022,
 
we
 
had
 
$242.3
million
 
aggregate
 
principal
 
amount
 
of
 
our
 
senior
 
secured
 
notes
 
outstanding. As of December 31, 2022,
 
no amounts were outstanding, and
 
no outstanding letters of credit issued
under the ABL Facility.
 
As of December 31, 2022, the available borrowing capacity under this facility was $100.0
million.
 
We dedicate a
 
portion of our
 
cash flow from
 
operations to the
 
payment of debt
 
service, reducing the
 
availability
of our cash flow
 
to fund capital expenditures,
 
acquisitions or strategic
 
development initiatives and
 
other general
corporate purposes. Our ability to make scheduled payments on or to refinance our debt obligations depends on
our ability to
 
generate cash in
 
the future and our
 
financial condition and operating
 
performance, which are subject
to prevailing economic and competitive
 
conditions and to certain
 
financial, business and other factors
 
beyond our
control. There can be no assurance that we
 
will maintain a level of cash flows from
 
operating activities sufficient
to permit us to pay the principal, premium, if any,
 
and interest on our debt. In addition, any failure to comply
 
with
covenants in the
 
instruments governing
 
our debt could
 
result in an
 
event of default
 
that, if not
 
cured or
 
waived,
would have a material adverse effect on us.
Our
 
level
 
of
 
indebtedness
 
could
 
have
 
further
 
consequences,
 
including,
 
but
 
not
 
limited
 
to,
 
increasing
 
our
vulnerability to adverse
 
economic or industry
 
conditions, placing us
 
at a competitive
 
disadvantage compared
 
to
other businesses in
 
the industries in
 
which we
 
operate that are
 
not as leveraged
 
and that may
 
be better positioned
to withstand
 
economic downturns,
 
limiting our
 
flexibility to
 
plan for,
 
or react
 
to, changes
 
in our
 
businesses and
the industries in which we operate, and requiring us to refinance all or a portion of our existing debt. We may not
be
 
able
 
to
 
refinance
 
on
 
commercially
 
reasonable
 
terms
 
or
 
at
 
all,
 
and
 
any
 
refinancing
 
of
 
our
 
debt
 
could
 
be
 
at
higher interest rates
 
and may require
 
us to comply
 
with more onerous
 
covenants, making it more
 
difficult to obtain
surety bonds, letters of credit or
 
other financial assurances that may be
 
demanded by our vendors or regulatory
agencies, particularly during periods in which credit markets
 
are weak.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
61
If
 
we
 
are
 
unable
 
to
 
service
 
our
 
debt
 
obligations,
 
we
 
could
 
face
 
substantial
 
liquidity
 
problems
 
and
 
we
 
may
 
be
forced to
 
reduce or delay
 
investments and capital
 
expenditures, or to
 
sell assets, seek
 
additional capital, including
additional secured or unsecured debt, or restructure or refinance our debt, and we may be unable to continue as
a going concern.
 
We may be
 
unable to consummate
 
any proposed asset
 
sales or recover
 
the carrying value
 
of
these assets,
 
and
 
any proceeds
 
may
 
not
 
be adequate
 
to
 
meet
 
any
 
debt
 
service
 
obligations
 
then
 
due.
 
Any
 
of
these
 
examples
 
potentially
 
could
 
have
 
a
 
material
 
adverse
 
impact
 
on
 
our
 
results
 
of
 
operations,
 
profitability,
stockholders’ equity and capital structure.
We
 
adjust
 
our
 
capital
 
structure
 
from
 
time
 
to
 
time
 
and
 
may
 
need
 
to
 
increase
 
our
 
debt
 
leverage,
 
which
would make us more sensitive to the effects of
 
economic downturns.
It is
 
possible that we
 
may need
 
to raise additional
 
debt or
 
equity funds
 
in the
 
future. Our ABL
 
Facility and operating
cash flows may not be adequate to fund our ongoing capital requirements, for any future acquisitions or projects
or to
 
refinance our
 
debt. There
 
is no
 
guarantee that
 
we will
 
be able
 
to refinance
 
our existing
 
debt, or
 
if we
 
do,
there is no guarantee that such new funding will be on
 
terms acceptable to us.
Global credit markets have been severely constrained in the
 
past, such as during a global financial crisis and the
European sovereign
 
debt crisis,
 
and during
 
the
 
COVID-19
 
pandemic,
 
and
 
the ability
 
to obtain
 
new funding
 
or
refinance in
 
the future
 
may be
 
significantly reduced.
 
If we
 
are unable
 
to obtain
 
sufficient funding,
 
either due
 
to
banking and
 
capital market
 
conditions, generally,
 
or due
 
to factors
 
specific to
 
our
 
business, we
 
may not
 
have
sufficient cash to meet our
 
ongoing capital requirements, which
 
in turn could materially and
 
adversely affect our
financial
 
condition.
 
Failure
 
to
 
obtain
 
sufficient
 
financing
 
could
 
cause
 
delays
 
or
 
abandonment
 
of
 
business
development plans and have a material adverse effect
 
on our business, operations and financial condition.
In
 
recent
 
years,
 
certain
 
financial
 
institutions,
 
investment
 
managers
 
and
 
insurance
 
companies
 
globally
 
have
responded to pressure
 
to take actions
 
to limit or
 
divest investments in, financing
 
made available to,
 
and insurance
coverage
 
provided
 
for,
 
the
 
development
 
of
 
new
 
coal-fired
 
power
 
plants
 
and
 
coal
 
miners
 
that
 
derive
 
revenues
from thermal
 
coal sales.
 
For
 
example, in
 
2017, some
 
financial institutions
 
publicly announced
 
that they
 
would
stop funding new thermal coal projects or would
 
otherwise reduce their overall lending to coal
 
producers. These
or similar
 
policies
 
may adversely
 
impact
 
the coal
 
industry
 
generally,
 
our ability
 
to
 
access
 
capital and
 
financial
markets in the future, our costs of capital and the future
 
global demand for coal.
Our business may require substantial ongoing capital
 
expenditures, and we may not have access to
 
the
capital required to reach full productive capacity at our
 
mines.
Maintaining
 
and
 
expanding
 
mines
 
and
 
related
 
infrastructure
 
is
 
capital
 
intensive.
 
Specifically,
 
the
 
exploration,
permitting
 
and
 
development
 
of
 
Met
 
coal
 
reserves,
 
mining
 
costs,
 
the
 
maintenance
 
of
 
machinery,
 
facilities
 
and
equipment
 
and
 
compliance
 
with
 
applicable
 
laws
 
and
 
regulations
 
require
 
ongoing
 
capital
 
expenditures.
 
Any
decision to increase
 
production at our existing
 
mines or to
 
develop the high-quality Met
 
coal recoverable reserves
at our
 
development properties in
 
the future
 
could also affect
 
our capital
 
needs or
 
cause future
 
capital expenditures
to be higher than in the past and/or higher than our estimates. We cannot assure that we will be able to maintain
our production
 
levels or
 
generate sufficient cash
 
flow, or that
 
we will
 
have access
 
to sufficient financing
 
to continue
our
 
production,
 
exploration,
 
permitting
 
and
 
development
 
activities
 
at
 
or
 
above
 
our
 
present
 
levels
 
and
 
on
 
our
present levels or levels achieved prior to the COVID-19 pandemic and on our current or projected timelines, and
we may be required to
 
defer all or a portion
 
of our capital expenditures.
 
Our results of operations,
 
business and
financial condition may be materially adversely affected
 
if we cannot make such capital expenditures.
To
 
fund our
 
capital expenditures,
 
we will
 
be required
 
to use
 
cash from
 
our operations,
 
incur debt
 
or raise
 
new
equity.
 
Our ability
 
to obtain
 
bank financing
 
or our
 
ability to
 
access the
 
capital markets
 
for future
 
equity or
 
debt
offerings, on the other hand, may
 
be limited by our financial
 
condition at the time of any
 
such financing or offering
and the
 
covenants in
 
our existing
 
debt agreements,
 
as well
 
as by
 
general economic
 
conditions, contingencies
and uncertainties that
 
are beyond
 
our control. If
 
cash flow generated
 
by our operations
 
or available borrowings
under our
 
bank financing
 
arrangements are
 
insufficient to
 
meet our
 
capital requirements
 
and we
 
are unable
 
to
access
 
the
 
capital
 
markets
 
on
 
acceptable
 
terms
 
or
 
at
 
all,
 
we
 
could
 
be
 
forced
 
to
 
curtail
 
the
 
expansion
 
of
 
our
existing mines and the development of
 
our properties which, in turn, could
 
lead to a decline in
 
our production and
could materially and adversely affect our business,
 
financial condition and results of operations.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
62
We may not recover
 
our investments in our
 
mining, exploration and other
 
assets, which may require
 
us
to recognize impairment charges related to those assets.
Our balance sheet includes a number of assets that are subject to impairment risk, particularly long-lived assets,
including
 
property,
 
plant
 
and
 
equipment,
 
mining
 
tenements,
 
exploration
 
and
 
evaluation
 
assets
 
and
 
intangible
assets (including goodwill).
 
The values of
 
these assets
 
are generally derived
 
from the fundamental
 
valuation of
the underlying mining operations and, as
 
such, are subject to many of
 
the same risks to which our
 
operations are
exposed, including
 
decreases in
 
coal prices,
 
foreign currency
 
exchange risks,
 
operational and
 
geological risks,
changes in coal production and changes in estimates of proven and
 
probable coal reserves. Adverse changes in
these and
 
other risk
 
factors could
 
lead to
 
a reduction
 
in the
 
valuation of
 
certain
 
of our
 
assets and
 
result in
 
an
impairment charge being recognized.
Risks
 
related
 
to
 
our
 
investment
 
in
 
WICET
 
may
 
adversely
 
affect
 
our
 
financial
 
condition
 
and
 
results
 
of
operations.
We have
 
a minority
 
interest in
 
WICET Holdings
 
Pty Ltd,
 
whose wholly
 
owned subsidiary,
 
Wiggins Island
 
Coal
Export Terminal
 
Pty Ltd, or WICET Pty Ltd, owns WICET. Other coal producers who export coal through WICET
also hold
 
shares
 
in
 
WICET
 
Holdings
 
Pty Ltd.
 
In addition,
 
we
 
and the
 
other coal
 
producers (or
 
shippers)
 
have
evergreen, ten
 
year take-or-pay
 
agreements with
 
WICET Pty
 
Ltd and
 
pay a
 
terminal handling
 
charge to
 
export
coal through
 
WICET,
 
which
 
is calculated
 
by reference
 
to WICET’s
 
annual
 
operating
 
costs,
 
as well
 
as finance
costs associated with WICET Pty Ltd’s external
 
debt facilities.
Under our take-or-pay agreement with WICET
 
Pty Ltd, or the WICET Take
 
-or-Pay Agreement, Curragh’s export
capacity is 1.5 MMtpa and we
 
are obligated to pay the
 
terminal handling charge for this capacity, whether utilized
or not. The terminal handling
 
charge calculation is based on
 
total operating and finance costs
 
of WICET Pty Ltd
being charged to contracted shippers in proportion to each shipper’s contracted capacity. Under the terms of the
WICET
 
Take
 
-or-Pay
 
Agreement
 
the
 
terminal
 
handling
 
charge
 
payable
 
by
 
us
 
can
 
be
 
adjusted
 
(increased
 
or
decreased) by WICET Pty Ltd if WICET Pty
 
Ltd’s operating and finance costs change,
 
or if a contracted shipper
defaults on its take-or-pay agreement obligations and has its contracted capacity reduced to
 
nil. Under the terms
of the WICET Take
 
-or-Pay Agreement there is a limit of how much WICET Pty Ltd can charge us for recovery of
its finance costs, referred to as a finance cap.
 
Since WICET began operating in April 2015, four WICET Holdings
Pty Ltd shipper-shareholders
 
have defaulted on their
 
obligations under their respective
 
take-or-pay agreements
and
 
subsequently
 
had
 
those
 
agreements
 
terminated.
 
The
 
result
 
of
 
these
 
terminations
 
is
 
a
 
decrease
 
in
 
the
aggregate contracted tonnage at WICET from 27 MMtpa to
 
15.5 MMtpa.
Given the
 
operation
 
of the
 
finance cap
 
(which
 
has been
 
reached,
 
subject
 
to further
 
adjustment
 
for Consumer
Price Index,
 
or CPI) there
 
is a
 
limit to the
 
recovery by
 
WICET of its
 
financing costs
 
from shippers. Accordingly,
prior defaults referred
 
to above have
 
resulted in only
 
minor increases to
 
the terminal handling
 
charges payable
by the remaining
 
shipper shareholders (including us).
 
These increases have related
 
to higher A$/ton (or
 
US$/ton)
charge for
 
operating
 
costs
 
resulting
 
from
 
a
 
lower
 
contract
 
base.
 
If
 
any of
 
the
 
remaining
 
shipper
 
shareholders
becomes
 
insolvent
 
and/or
 
defaults
 
under
 
its
 
take-or-pay
 
agreement,
 
the
 
terminal
 
handling
 
charges
 
for
 
the
remaining shipper shareholders, including us, may increase proportionately to pay the defaulting shipper’s share
of WICET’s
 
operating
 
and
 
financing costs
 
going forward
 
(noting that
 
the
 
finance cap
 
applies
 
in respect
 
of the
financing costs component of the terminal handling charges).
In addition, if we default under the WICET Take
 
-or-Pay Agreement and that default is not remedied, then we will
be obligated
 
to pay
 
a termination
 
payment. The
 
termination payment
 
is equal
 
to the
 
lesser of
 
our proportion
 
of
WICET Pty Ltd’s
 
total external
 
debt (which
 
is based on
 
the proportion
 
that our contracted
 
tonnage bears to
 
the
total contracted tonnage
 
at WICET when
 
the payment obligation
 
is triggered) and
 
ten years equivalent
 
terminal
handling
 
charges
 
at
 
the
 
prevailing
 
rate
 
at
 
the
 
time
 
that
 
the
 
termination
 
payment
 
falls
 
due.
 
We
 
have
 
provided
security to WICET
 
Pty Ltd in
 
the form of
 
a bank guarantee, the
 
amount of which
 
is required to
 
cover our estimated
liabilities as a shipper under the WICET Take
 
-or-Pay Agreement for the following twelve-month
 
period.
 
In the event of WICET Pty Ltd defaulting on its external debt obligations, external lenders to WICET Pty Ltd may
enforce
 
their
 
rights
 
to
 
the
 
security
 
over
 
the
 
assets
 
of
 
WICET
 
and
 
appoint
 
a
 
receiver
 
to
 
take
 
steps
 
to
 
recover
outstanding debt. The
 
external lenders
 
do not have
 
direct recourse to
 
the shippers
 
to recover outstanding
 
debt
and shipper take-or-pay agreements would remain on foot and access to the port would continue to be available
to us.
 
In the
 
event of
 
a permanent
 
cessation of
 
operations
 
at WICET,
 
we may
 
be required
 
to procure
 
additional
 
port
capacity elsewhere, as well as be liable for a termination payment
 
under the WICET Take
 
-or-Pay Agreement.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
63
Risks related to
 
the Supply Deed
 
with Stanwell may
 
adversely affect
 
our financial condition
 
and results
of operations.
Curragh has a CSA,
 
as amended from
 
time to time,
 
with Stanwell to
 
supply thermal coal
 
to the Stanwell
 
Power
Station. The
 
CSA restricted
 
Curragh from
 
mining the
 
SRA which
 
was reserved
 
for the
 
benefit of
 
Stanwell and
could not be
 
mined without
 
Stanwell’s consent.
 
Under the
 
CSA, in addition
 
to supplying thermal
 
coal at
 
a price
below the cost
 
to Curragh
 
of mining and
 
processing the
 
coal, Curragh
 
pays certain
 
rebates to
 
Stanwell on
 
Met
coal exported
 
from certain
 
parts of
 
Curragh, which
 
represents
 
the deferred
 
purchase
 
cost of
 
the right
 
to mine
some areas at Curragh. Our cost of
 
supplying coal to Stanwell has been
 
and may continue to be greater than
 
the
price paid by Stanwell.
 
On August 14, 2018, Curragh entered into the Supply
 
Deed with Stanwell. The Supply Deed grants Curragh
 
the
right
 
to
 
mine
 
the
 
coal
 
reserves
 
in
 
the
 
SRA.
 
In
 
exchange
 
for
 
these
 
rights,
 
Curragh
 
has
 
agreed
 
to
 
certain
amendments to
 
the CSA
 
and to
 
enter into
 
the NCSA,
 
which will
 
commence on
 
or around
 
the expiration
 
of the
CSA (currently
 
expected to
 
expire in
 
2027).
 
On July
 
12, 2019,
 
Curragh
 
entered into
 
the NCSA
 
with Stanwell.
 
Curragh agreed that
 
the total value
 
of the discount
 
received by Stanwell
 
on coal supplied
 
to it under
 
the NCSA
should (by the expiry date
 
of the NCSA) be equal
 
to the net present value
 
of A$210 million as at
 
the date of the
Supply Deed.
 
No export rebates
 
are payable during
 
the term of
 
the NCSA. The
 
amortized cost of
 
the deferred
consideration was $243.2 million (A$359.0 million) as of December
 
31, 2022.
We could
 
be adversely
 
affected if we
 
fail to
 
appropriately provide financial
 
assurances for
 
our obligations.
Australian laws and
 
U.S. federal and
 
state laws require
 
us to provide
 
financial assurances related
 
to requirements
to reclaim lands used
 
for mining, to pay
 
federal and state workers’
 
compensation, to provide financial assurances
for coal
 
lease obligations
 
and to
 
satisfy other
 
miscellaneous obligations.
 
The primary
 
methods we
 
use to
 
meet
those obligations in
 
the United States
 
are to provide
 
a third-party surety
 
bond or provide
 
a letter of credit.
 
As of
December 31, 2022,
 
we provided $34.9
million of third-party
 
surety bonds in
 
connection with our
 
U.S. Operations.
There are no cash collateral requirements to support any
 
of the outstanding bonds.
Our financial
 
assurance obligations
 
may increase
 
due to
 
a number
 
of factors,
 
including the
 
size of
 
our mining
footprint and
 
new government
 
regulations,
 
and
 
we may
 
experience
 
difficulty
 
procuring
 
or renewing
 
our surety
bonds. In addition, our bond issuers may demand higher fees or additional collateral, including letters of
 
credit or
other terms less favorable to us upon those renewals. Because we are required by federal and state law to have
these
 
bonds
 
or
 
other
 
acceptable
 
security
 
in
 
place
 
before
 
mining
 
can
 
commence
 
or
 
continue,
 
any
 
failure
 
to
maintain surety bonds, letters
 
of credit or other guarantees or
 
security arrangements would adversely
 
affect our
ability to mine coal. That failure
 
could result from a variety
 
of factors, including lack of
 
availability of surety bond
or letters of credit,
 
higher expense or
 
unfavorable market terms,
 
the exercise by
 
third-party surety bond
 
issuers
of their right
 
to refuse
 
to renew
 
the surety
 
and the
 
requirement to
 
provide collateral
 
for future
 
third-party surety
bond
 
issuers
 
under
 
the
 
terms
 
of
 
financing
 
arrangements.
 
If
 
we
 
fail
 
to
 
maintain
 
adequate
 
bonding,
 
our
 
mining
permits could be
 
invalidated, which would
 
prevent mining operations from
 
continuing, and future
 
operating results
could be materially adversely affected.
In
 
Australia,
 
the
 
Financial
 
Provisioning
 
Act
 
amended
 
the
 
financial
 
assurance
 
provisions
 
of
 
the
 
EP
 
Act,
 
and
impacted the way that our Australian Operations
 
provide for and manage associated costs
 
of providing financial
assurances related to mine rehabilitation obligations.
The Financial Provisioning Act:
•
 
amended
 
the
 
financial
 
assurance
 
arrangements
 
for
 
resource
 
activities
 
under
 
the
 
EP
 
Act
 
with
 
a
 
new
financial provisioning
 
scheme, and
 
changed
 
how the
 
ERC for
 
an environmental
 
authority is
 
calculated;
and
•
 
amended
 
the
 
EP
 
Act
 
to
 
introduce
 
new
 
requirements
 
for
 
the
 
progressive
 
rehabilitation
 
and
 
closure
 
of
mined land.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
64
Since April 1, 2019, any financial assurance currently
 
held for environmental approvals already held
 
in Australia
are
 
treated
 
as
 
surety
 
under
 
the
 
Financial
 
Provisioning
 
Act.
 
There
 
was
 
a
 
transition
 
period
 
of
 
three
 
years
 
that
commenced
 
in
 
early
 
2019
 
during
 
which
 
all
 
miners
 
in
 
Queensland
 
were
 
assessed
 
and
 
received
 
an
 
initial
 
risk
allocation
 
decision
 
based
 
on
 
a
 
formulaic
 
calculation
 
of
 
their
 
ERC.
 
Our
 
ERC
 
is
 
the
 
cost
 
estimated
 
by
 
the
government department
 
of rehabilitating
 
the land
 
on which
 
our operation
 
is carried
 
out. This
 
allocation put
 
our
resource activity
 
at Curragh
 
into a
 
risk category
 
under the
 
Financial
 
Provisioning Act
 
based on
 
the regulator’s
assessment of both
 
the amount of
 
our ERC and
 
our financial capacity
 
to carry out
 
and discharge the
 
rehabilitation
liability and obligation
 
at the time
 
our mining
 
operations cease.
 
This risk assessment
 
is reviewed annually,
 
and
assessment fees are payable each time there is an allocation
 
decision for our operations in Queensland.
The financial provisioning
 
scheme is managed
 
by the Scheme
 
Manager and financial
 
assurance is provided
 
by
paying
 
a
 
contribution
 
to
 
the
 
Scheme
 
and/or
 
the
 
giving
 
of
 
surety
 
to
 
the
 
Scheme
 
Manager.
 
Our
 
contribution
 
is
calculated
 
as
 
the
 
prescribed
 
percentage
 
(dependent
 
on
 
risk
 
allocation
 
decision)
 
of
 
Curragh’s
 
ERC.
 
The
prescribed percentages
 
for each
 
category are:
 
(1) Very
 
low: 0.5%;
 
(2) Low: 1.0%;
 
and (3) Moderate:
 
2.75%. In
the event Curragh’s ERC is allocated a
 
high risk allocation, we are required to
 
negotiate the percentage of surety
to be provided with the Scheme Manager. The Scheme Manager is a statutory officer and manages the Scheme
contributions and the sureties on behalf of the Queensland
 
State Government.
 
In
 
October
 
2022,
 
the
 
Scheme
 
Manager
 
completed
 
the
 
assessment
 
of
 
the
 
Annual
 
Review
 
Allocation
 
for
environmental authority
 
number EPML00643713
 
and issued
 
an Annual
 
Review Allocation
 
of “Moderate”.
 
The
moderate rating results in Curragh being
 
obliged to make a financial contribution
 
to the Scheme of 2.75% of the
ERC.
 
In January
 
2023, the
 
Scheme
 
Manager
 
completed
 
an assessment
 
of the
 
Annual
 
Review
 
Allocation
 
for
Environmental Authority
 
Number EPVX00635313
 
and issued
 
an Annual
 
Review Allocation
 
of “High”
 
in respect
of MDL162
 
requiring
 
Curragh
 
to
 
maintain
 
its
 
historical
 
financial
 
assurance
 
in
 
respect
 
of
 
100%
 
of
 
the
 
ERC
 
for
Environmental Authority Number EPVX00635313.
There can be no assurance that our risk category allocation
 
will not change in future years.
 
Our financial assurance obligations may increase due to
 
a number of factors, including but not limited to:
•
 
any change that increases ERC or area of disturbance;
•
 
any major Environmental Authority amendment;
•
 
compliance with existing Environmental Authority obligations; and
•
 
major changes to financial soundness of the EA Holder.
For more information on the Financial Provisioning Act, see
 
Item 1. “Business—Regulatory Matters—Australia—
Environmental Protection Act 1994 (Qld).”
Mine closures entail substantial costs. If we prematurely close one or more of our mines, our operations
and financial performance would likely be affected
 
adversely.
Federal and state
 
regulatory agencies
 
have the
 
authority following
 
significant health
 
and safety
 
incidents, such
as
 
fatalities,
 
to
 
order
 
mining
 
operations
 
to
 
be
 
temporarily
 
suspended
 
or
 
a
 
facility
 
be
 
permanently
 
closed.
 
For
example, on
 
January 12,
 
2020, operations
 
at our
 
Curragh mine
 
were temporarily
 
suspended after
 
a contractor
was
 
fatally
 
injured
 
during
 
a
 
tire
 
change
 
activity
 
in
 
the
 
main
 
workshop
 
on
 
site
 
and
 
on
 
November
 
21,
 
2021,
operations at our Curragh mine were temporarily suspended after an employee was fatally injured while working
in the dragline
 
operations. We could also
 
be required to
 
close or discontinue
 
operations at particular
 
mines before
the end
 
of their
 
mine life
 
due to
 
environmental,
 
geological,
 
geotechnical,
 
commercial,
 
leasing or
 
other issues.
Such
 
closure
 
or
 
discontinuance
 
of
 
operations
 
could
 
result
 
in
 
significant
 
closure
 
and
 
rehabilitation
 
expenses,
employee redundancy
 
costs, contractor
 
demobilization costs
 
and other
 
costs or
 
loss of
 
revenues. If
 
and when
incurred, these closure and
 
rehabilitation costs could exceed
 
our current estimates. If
 
one or more of our
 
mines
is closed earlier
 
than anticipated, we
 
would be required
 
to fund the
 
reclamation and closure costs
 
on an
 
expedited
basis and potentially
 
lose revenues and,
 
for some
 
of our operations,
 
pay for take-or-pay
 
arrangements that
 
we
no longer use, which would
 
have an adverse impact on
 
our operating and financial performance.
 
Many of these
costs could also
 
be incurred
 
if a mine
 
was unexpectedly
 
placed on care
 
and maintenance
 
before the end
 
of its
planned mine life
 
such as our
 
mines in the
 
U.S. Operations, which
 
were temporarily idled
 
in 2020 as a
 
result of
the COVID-19 pandemic.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
65
If the
 
assumptions underlying
 
our provision
 
for reclamation
 
and mine
 
closure obligations
 
prove to
 
be
inaccurate, we could be required to expend greater
 
amounts than anticipated.
The
 
Environmental
 
Protection
 
Act 1994
 
(Qld)
 
and
 
the
 
SMCRA
 
establish
 
operational,
 
reclamation
 
and
 
closure
standards
 
for
 
all
 
aspects
 
of
 
surface
 
mining
 
as
 
well
 
as
 
deep
 
mining.
 
We
 
accrue
 
for
 
the
 
costs
 
of
 
current
 
mine
disturbance
 
and
 
final
 
mine
 
closure,
 
including
 
the
 
cost
 
of
 
treating
 
mine
 
water
 
discharge
 
where
 
necessary.
Estimates of
 
our total
 
reclamation and
 
mine-closing
 
liabilities totaled
 
$138.5
million as
 
of December
 
31, 2022,
based upon
 
permit requirements
 
and the
 
historical
 
experience at
 
our operations,
 
and depend
 
on a
 
number
 
of
variables involving assumptions and estimation and therefore may be subject to change, including the estimated
future
 
asset
 
retirement
 
costs
 
and the
 
timing
 
of
 
such
 
costs,
 
estimated
 
proven
 
reserves,
 
assumptions
 
involving
third-party contractors, inflation rates
 
and discount rates.
 
If these accruals
 
are insufficient or our
 
liability in a
 
future
year is
 
greater than
 
currently anticipated,
 
our future
 
operating results
 
and financial
 
position could
 
be adversely
affected. See
 
Item 7. “Management’s Discussion
 
and Analysis
 
of Financial
 
Condition and
 
Results of
 
Operations—
Critical Accounting Policies and Estimates.”
We are subject to foreign exchange risks involving
 
certain operations in multiple countries.
Loss sustained from adverse movements
 
in currency exchange rates
 
can impact our financial performance
 
and
financial position and the level of additional funding required to support
 
our businesses. Our financial results are
reported
 
in
 
US$
 
and
 
certain
 
parts
 
of
 
our
 
liabilities,
 
earnings
 
and
 
cash
 
flows
 
are
 
influenced
 
by
 
movements
 
in
exchange rates, especially movements in A$
 
to US$ exchange rate. For
 
example, costs relating to our
 
Australian
Operations
 
are
 
generally
 
denominated
 
in
 
A$.
 
In
 
addition,
 
foreign
 
currency
 
exposures
 
arise
 
in
 
relation
 
to
 
coal
supply
 
contracts,
 
procurement
 
of
 
plant
 
and
 
equipment
 
and
 
debt,
 
which
 
may
 
be
 
priced
 
in
 
A$
 
or
 
other
 
foreign
currencies other than US$.
The impact of currency exchange rate movements will vary depending on factors such as the nature, magnitude
and duration
 
of the movements,
 
the extent
 
to which
 
currency risk
 
is hedged under
 
forward exchange
 
contracts
or other hedging instruments and the terms of these contracts. We may enter into forward exchange
 
contracts to
hedge a portion of our
 
foreign currency exposure of
 
our Australian Operations from
 
time to time. The unhedged
portion of our non-US$
 
exposures against exchange rate fluctuations will
 
be at the risk
 
of any adverse movement
in exchange rates, which may affect our operating results,
 
cash flows and financial condition.
Interest rates could change substantially and have an adverse
 
effect on our profitability.
We are exposed to interest rate risk
 
in relation to variable-rate bank balances
 
and variable-rate borrowings. Our
interest rate risk primarily arises from fluctuations in LIBOR and the Australian Bank Bill Swap Yield, or BBSY,
 
in
relation to US$-
 
and A$-denominated borrowings,
 
respectively.
 
Our lending rates
 
may increase in
 
the future as
a result of factors beyond our control and may
 
result in an adverse effect on our financial condition and results of
operations.
In addition,
 
national and
 
international regulators
 
and law
 
enforcement agencies
 
have conducted
 
investigations
into a number of rates or indices, which
 
are deemed to be “reference rates.”
 
Actions by such regulators and law
enforcement agencies may result
 
in changes to the
 
manner in which certain
 
reference rates are determined,
 
their
discontinuance,
 
or
 
the
 
establishment
 
of
 
alternative
 
reference
 
rates.
 
For
 
example,
 
after
 
2021,
 
the
 
United
Kingdom’s Financial
 
Conduct Authority,
 
which regulates
 
LIBOR, no
 
longer compelled banks
 
to submit rates
 
for
the
 
calculation
 
of
 
non-U.S.-dollar
 
LIBOR.
 
U.S-dollar
 
LIBOR
 
must
 
be
 
replaced
 
before
 
June
 
30,
 
2023.
 
The
Alternative Reference Rates
 
Committee has proposed
 
SOFR as its
 
recommended alternative
 
to LIBOR. At
 
this
time, it
 
is not
 
possible to
 
predict the
 
effect that
 
these developments,
 
any discontinuance,
 
modification or
 
other
reforms to
 
LIBOR or any
 
other reference rate,
 
or the
 
establishment of alternative
 
reference rates, including
 
SOFR,
may
 
have
 
on
 
LIBOR
 
or
 
other
 
benchmarks,
 
including
 
LIBOR-based
 
borrowings
 
under
 
our
 
variable-rate
 
bank
balances and variable-rate borrowings.
 
Furthermore, the use of
 
alternative reference rates or
 
other reforms could
cause the
 
market value
 
of, the
 
applicable interest
 
rate on
 
and the
 
amount
 
of interest
 
paid on
 
our benchmark-
based borrowings
 
to be
 
materially
 
different
 
than
 
expected and
 
could
 
materially
 
adversely
 
impact
 
our ability
 
to
refinance such borrowings or raise future indebtedness
 
on a cost effective basis.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
66
We may
 
be unsuccessful
 
in integrating
 
the operations
 
of acquisitions
 
with our
 
existing operations
 
and
in realizing all or any part of the anticipated benefits of
 
any such acquisitions.
From time to time, we
 
may evaluate and acquire assets and businesses that
 
we believe complement our existing
assets and business. Acquisitions may
 
require substantial capital or
 
the incurrence of substantial indebtedness.
Our capitalization
 
and results
 
of operations
 
may change
 
significantly as
 
a result
 
of future
 
acquisitions. Acquisitions
and business expansions involve numerous risks, including the
 
following:
•
 
difficulties in the integration of the assets and operations
 
of the acquired businesses;
•
 
inefficiencies
 
and
 
difficulties
 
that
 
arise
 
because
 
of
 
unfamiliarity
 
with
 
new
 
assets
 
and
 
the
 
businesses
associated with them and new geographic areas;
•
 
the diversion of management’s attention from other
 
operations; and
•
 
timing, and whether the acquisition
 
or business expansion is occurring
 
during adverse economic, social
and regulatory periods.
Further,
 
unexpected
 
costs
 
and
 
challenges
 
may
 
arise
 
whenever
 
businesses
 
with
 
different
 
operations
 
or
management
 
are
 
combined,
 
and
 
we
 
may
 
experience
 
unanticipated
 
delays
 
in
 
realizing
 
the
 
benefits
 
of
 
an
acquisition. Entry into certain lines of
 
business may subject us to new
 
laws and regulations with which we
 
are not
familiar and may lead
 
to increased litigation and
 
regulatory risk. Also, following
 
an acquisition, we may
 
discover
previously
 
unknown liabilities
 
associated with
 
the acquired
 
business
 
or assets
 
for which
 
we have
 
no recourse
under applicable indemnification provisions. If a new business generates insufficient revenue or if we are unable
to efficiently manage our expanded operations,
 
our results of operations may be adversely affected.
Coronado
 
Global
 
Resources Inc.
 
is
 
a
 
holding
 
company
 
with
 
no
 
operations
 
of
 
its
 
own
 
and,
 
as
 
such,
 
it
depends
 
on
 
its
 
subsidiaries
 
for
 
cash
 
to
 
fund
 
its
 
operations
 
and
 
expenses,
 
including
 
future
 
dividend
payments, if any.
As a
 
holding company,
 
our
 
principal
 
source
 
of cash
 
flow
 
is
 
distributions
 
from
 
our
 
subsidiaries.
 
Therefore,
 
our
ability to fund and conduct our business, service our debt,
 
and pay dividends, if any,
 
in the future will depend on
the
 
ability
 
of
 
our
 
subsidiaries
 
to
 
generate
 
sufficient
 
cash
 
flow
 
to
 
make
 
upstream
 
cash
 
distributions
 
to
 
us.
 
Our
subsidiaries are separate legal
 
entities, and although they
 
are wholly-owned and controlled
 
by us, they have
 
no
obligation to make any funds available to us, whether
 
in the form of loans, dividends, or otherwise. The
 
ability of
our
 
subsidiaries
 
to
 
distribute
 
cash
 
to
 
us
 
will
 
also
 
be
 
subject
 
to,
 
among
 
other
 
things,
 
restrictions
 
that
 
may
 
be
contained in our subsidiary agreements (as entered into from time to time), availability
 
of sufficient funds in such
subsidiaries and applicable laws and regulatory restrictions. Claims of any creditors of our subsidiaries generally
will have
 
priority as
 
to the
 
assets of
 
such subsidiaries
 
over our
 
claims and
 
claims of
 
our creditors
 
and stockholders.
To
 
the extent the ability
 
of our subsidiaries
 
to distribute dividends or
 
other payments to us
 
is limited in any
 
way,
our ability to fund and conduct our business, service our
 
debt, and pay dividends, if any,
 
could be harmed.
Legal, Compliance and Sustainability Risks
We could be negatively affected if
 
we fail to maintain satisfactory labor relations.
Relations with
 
our employees
 
and, where
 
applicable, organized
 
labor are
 
important to
 
our success.
 
Enterprise
bargaining and other disputes between us and our employees or disputes affecting our contractors may result in
strikes or uncompetitive work practices.
As of
 
December 31,
 
2022, we
 
had 1,735
 
employees.
 
In addition,
 
as of
 
December 31,
 
2022, there
 
were 2,326
contractors
 
supplementing
 
the
 
permanent
 
workforce,
 
primarily
 
at
 
Curragh.
 
As
 
of
 
December
 
31,
 
2022,
approximately
 
11.5%
 
of our
 
total employees,
 
all at
 
our
 
Australian Operations,
 
were represented
 
by organized
labor unions and covered
 
by the EA. In
 
May 2019, the Australian
 
Fair Work Commission
 
approved the Curragh
Mine Enterprise
 
Agreement 2019.
 
This EA
 
has a
 
nominal expiration
 
date of
 
May 26,
 
2022 and
 
but remains
 
in
place by
 
operation of
 
the Fair
 
Work Act
 
2009 (Cth)
 
until replaced
 
or terminated
 
by the
 
Fair Work
 
Commission.
We have
 
been negotiating
 
with employee
 
bargaining representatives
 
for a
 
replacement EA
 
since March
 
2022.
Those negotiations continue
 
in good faith
 
with the intent
 
of reaching an
 
agreement as
 
soon as practicable.
 
Our
U.S. Operations employ a 100% non-union labor force
 
.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
67
Future industrial
 
action by
 
our employees
 
or mining
 
contractors’ employees or
 
involving trade unions
 
could disrupt
operations and negatively impact mine productivity,
 
production and profitability.
Our operations
 
may impact
 
the environment
 
or cause
 
exposure to
 
hazardous substances,
 
which could
result in material liabilities to us.
We are
 
subject to
 
extensive environmental
 
laws and
 
regulations,
 
and our
 
operations may
 
substantially
 
impact
the
 
environment
 
or
 
cause
 
exposure
 
to
 
hazardous
 
materials
 
to
 
our
 
contractors,
 
our
 
employees
 
or
 
local
communities. We use hazardous materials
 
and generate hazardous or other regulated
 
waste, which we store in
our storage or disposal
 
facilities. We may become subject to
 
statutory or common law claims
 
(including damages
claims) as
 
a result
 
of
 
our
 
use of
 
hazardous
 
materials
 
and generation
 
of hazardous
 
waste.
 
A number
 
of laws,
including, in
 
the United
 
States, the
 
CERCLA or
 
Superfund, and
 
the RCRA,
 
and in
 
Australia, the
 
Environmental
Protection Act 1994 (Qld),
 
impose liability relating to
 
contamination by hazardous
 
substances. Furthermore, the
use of
 
hazardous materials
 
and generation
 
of hazardous
 
and other
 
waste may
 
subject us
 
to investigation
 
and
require the clean-up of soil, surface water,
 
groundwater and other media.
Mining
 
operation
 
process,
 
including
 
blasting
 
and
 
processing
 
ore
 
bodies,
 
can
 
also
 
generate
 
environmental
impacts. These
 
impacts include,
 
but are
 
not limited
 
to, leakages
 
of polluting
 
substances,
 
explosions,
 
flooding,
fires, accidental mine water discharges,
 
and excessive dust and noise. Such
 
risks could result in damage to
 
the
applicable mine site, personal
 
injury to our employees
 
and contractors, environmental
 
damage, decreased coal
production and
 
possible legal
 
liability under
 
environmental regulations.
 
Employee or
 
strict liability
 
claims under
common law
 
or environmental
 
regulations in
 
relation to
 
these matters
 
may arise,
 
for example, out
 
of current
 
or
former activities
 
at sites
 
that we
 
own, lease
 
or operate
 
and at
 
properties to
 
which hazardous
 
substances have
been sent for treatment,
 
storage, disposal or other
 
handling. Our liability
 
for such claims may
 
be strict, joint and
several with other miners or parties or with our
 
contractors, such that we may be held
 
responsible for more than
our
 
share
 
of
 
the
 
contamination
 
or
 
other
 
damages,
 
or
 
even
 
for
 
the
 
entire
 
amount
 
of
 
damages
 
assessed.
Additionally,
 
any violations of
 
environmental laws by
 
us could lead
 
to, among other
 
things, the imposition
 
on us
of substantial fines,
 
penalties, other civil and
 
criminal sanctions, the curtailment
 
or cessation of
 
operations, orders
to
 
pay
 
compensation,
 
orders
 
to
 
remedy
 
the
 
effects
 
of
 
violations
 
and
 
take
 
preventative
 
steps
 
against
 
possible
future violations,
 
increased compliance costs,
 
or costs
 
for environmental remediation,
 
rehabilitation or
 
rectification
works.
We maintain extensive
 
Met coal refuse
 
areas and slurry impoundments
 
at our mining
 
properties. At Curragh, coal
slurry
 
is
 
disposed
 
of
 
by
 
pumping
 
into
 
an
 
impoundment
 
area
 
where
 
particles
 
are
 
allowed
 
to
 
settle.
 
We
 
have
procedures
 
in
 
place
 
that
 
the
 
Curragh
 
slurry
 
impoundments
 
remain
 
below
 
the
 
surrounding
 
topography
 
so
 
that
there is
 
minimal likelihood
 
of failure
 
and/or spills.
 
At our
 
U.S. Operations,
 
refuse areas
 
and impoundments
 
are
frequently inspected and subject
 
to extensive governmental regulation.
 
Slurry impoundments have
 
been known
to
 
fail,
 
releasing
 
large
 
volumes
 
of
 
coal
 
slurry
 
into
 
the
 
surrounding
 
environment.
 
Structural
 
failure
 
of
 
an
impoundment can result in extensive damage to the environment
 
and natural resources, such as bodies of water
that the coal slurry reaches, as well as create liability for
 
related personal injuries, property damages and injuries
to natural resources
 
and plant and
 
wildlife. Of the
 
five refuse areas
 
among our U.S.
 
mining properties, only
 
two
impound slurry; the other facilities are combined refuse
 
and do not impound slurry.
 
Two of our impoundments
 
in
the U.S. overlie
 
mined out
 
areas, which
 
can pose
 
a heightened
 
risk of
 
failure and
 
the assessment
 
of damages
arising out of such failure.
 
If one of our impoundments
 
were to fail, we could
 
be subject to substantial
 
claims for
the resulting environmental contamination and associated
 
liability, as well as
 
for related fines and penalties.
Changes in
 
and compliance
 
with government
 
policy, regulation
 
or legislation
 
may adversely
 
affect our
financial condition and results of operations.
The coal mining industry
 
is subject to regulation
 
by federal, state and
 
local authorities in each
 
relevant jurisdiction
with respect
 
to
 
a range
 
of industry
 
specific and
 
general
 
matters.
 
Any future
 
legislation
 
and
 
regulatory
 
change
imposing more constraints or
 
more stringent requirements may
 
affect the coal mining
 
industry and may adversely
affect our financial condition and results of operations. Examples of such changes are, future laws or regulations
that may limit
 
the emission
 
of GHGs, attach
 
a cost to
 
GHG emissions,
 
or limit the
 
use of thermal
 
coal in power
generation, more stringent workplace health and safety laws, more rigorous environmental laws, and changes to
existing taxation and royalty legislation.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
68
Compliance
 
with
 
applicable
 
federal,
 
state
 
and
 
local
 
laws
 
and
 
regulations
 
may
 
become
 
more
 
costly
 
and
time-consuming
 
and
 
may
 
delay
 
commencement
 
or
 
interrupt
 
continuation
 
of
 
exploration
 
or
 
production
 
at
 
our
operations. We have
 
incurred, and may
 
in the future
 
incur, significant expenditures to comply
 
with such regulation
and legislation. These laws are constantly evolving and may become increasingly
 
stringent. The ultimate impact
of complying with existing laws
 
and regulations is not always
 
clearly known or determinable due
 
in part to the
 
fact
that
 
certain
 
implementation
 
of
 
the
 
regulations
 
for
 
these
 
laws
 
have
 
not
 
yet
 
been
 
promulgated
 
and
 
in
 
certain
instances
 
are
 
undergoing
 
revision.
 
These
 
laws
 
and
 
regulations,
 
particularly
 
new
 
legislative
 
or
 
administrative
proposals
 
(or
 
judicial
 
interpretations
 
of
 
existing
 
laws
 
and
 
regulations),
 
could
 
result
 
in
 
substantially
 
increased
capital,
 
operating
 
and
 
compliance
 
costs
 
and
 
could
 
have
 
a
 
material
 
adverse
 
effect
 
on
 
our
 
operations
 
and
 
our
customers’ ability to use our products. Due in part to the extensive and comprehensive
 
regulatory requirements,
along with
 
changing interpretations
 
of these
 
requirements, violations
 
of applicable
 
federal, state
 
and local
 
laws
and regulations occur from time to time in the
 
coal industry and minor violations have
 
occurred at our Australian
Operations and our U.S. Operations in the past.
Moreover, changes in the law
 
may impose additional standards and a heightened degree
 
of responsibility for us
and our stockholders, directors and employees; may
 
require unprecedented compliance efforts; could
 
divert our
management’s
 
attention;
 
and
 
may
 
require
 
significant
 
expenditures.
 
For
 
example,
 
we
 
may
 
also
 
be
 
subject
 
to
unforeseen
 
environmental
 
liabilities
 
resulting
 
from
 
coal-related
 
activities,
 
which
 
may
 
be
 
costly
 
to
 
remedy
 
or
adversely impact
 
our operations.
 
In particular,
 
the acceptable
 
level of
 
pollution and
 
the potential
 
abandonment
costs and obligations for which we
 
may become liable as a result
 
of our activities may be difficult
 
to assess under
the current legal
 
framework. To the extent that
 
required expenditures, as
 
with all
 
costs, are not
 
ultimately reflected
in the
 
prices of
 
coal, our
 
operating results
 
will be
 
detrimentally
 
impacted. The
 
costs
 
and operating
 
restrictions
necessary for compliance
 
with safety
 
and environmental laws
 
and regulations,
 
which is a
 
major cost
 
consideration
for
 
our
 
Australian
 
Operations
 
and
 
U.S.
 
Operations,
 
may
 
have
 
an
 
adverse
 
effect
 
on
 
our
 
competitive
 
position
relative to foreign producers and operators in
 
other countries which may not be
 
required to incur equivalent costs
in their operations.
We are
 
also affected
 
by various
 
other international,
 
federal, state,
 
local and
 
tribal or
 
indigenous environmental
laws
 
and
 
regulations
 
that
 
impact
 
our
 
customers.
 
To
 
the
 
extent
 
that
 
such
 
environmental
 
laws
 
and
 
regulations
reduce
 
customer
 
demand
 
for
 
or
 
increase
 
the
 
price
 
of
 
coal,
 
we
 
will
 
be
 
detrimentally
 
impacted.
 
For
 
additional
information
 
about
 
the
 
various
 
regulations
 
affecting
 
us,
 
see
 
Item 1.
 
“Business—Regulatory
 
Matters—Australia”
and “Business—Regulatory Matters—United States.”
We
 
are
 
subject
 
to
 
extensive
 
forms
 
of
 
taxation,
 
which
 
imposes
 
significant
 
costs
 
on
 
us,
 
and
 
future
regulations
 
and
 
developments
 
could
 
increase
 
those
 
costs
 
or
 
limit
 
our
 
ability
 
to
 
produce
 
coal
competitively.
Federal,
 
state
 
or
 
local
 
governmental
 
authorities
 
in
 
nearly
 
all
 
countries
 
across
 
the
 
global
 
coal
 
mining
 
industry
impose various
 
forms of
 
taxation
 
on coal
 
producers,
 
including production
 
taxes,
 
sales-related taxes,
 
royalties,
stamp duty, environmental
 
taxes and income taxes.
 
For
 
example,
 
on
 
September
 
27,
 
2022,
 
we
 
received
 
from
 
the
 
Queensland
 
Revenue
 
Office,
 
or
 
QRO,
 
an
assessment of the
 
stamp duty payable
 
on our acquisition
 
of the Curragh
 
mine in March
 
2018. The QRO
 
assessed
the stamp duty on this
 
acquisition at an amount
 
of $55.4 million (A$82.2
 
million) plus unpaid tax
 
interest of $8.2
million
 
(A$12.1
 
million).
 
On
 
November
 
23,
 
2022,
 
the
 
Company
 
filed
 
an
 
objection
 
to
 
the
 
assessment
 
and
 
is
currently awaiting the outcome of this objection. The outcome
 
of this objection is uncertain.
We have reviewed the assessment received and based on legal and valuation advice the Company continues to
maintain its position regarding the estimated accrual
 
of $29.0 million (A$43.0 million) stamp duty payable
 
on the
Curragh acquisition. During the
 
period we made a
 
partial payment reducing the
 
estimated accrual to $11.7 million
(A$17.3
 
million)
 
as
 
at
 
December
 
31,
 
2022,
 
which
 
is
 
included
 
within
 
“Accrued
 
Expenses
 
and
 
Other
 
Current
Liabilities” in its Consolidated Balance sheet.
 
We cannot
 
guarantee that
 
the steps
 
we take
 
to defend
 
our position
 
on this
 
matter will
 
be successful,
 
in which
case the amount assessed by
 
the QRO and unpaid tax interest
 
on the amount outstanding may become
 
due and
payable.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
69
Additionally, in 2022, the Queensland
 
State Government in
 
Australia amended the
 
Mineral Resources Regulation
2013 (Qld) introducing additional
 
higher tiers to the
 
coal royalty rates effective
 
from July 1, 2022,
 
increasing the
royalty payable by our Australian Operations.
 
The new
 
tiers applicable
 
in calculating
 
the royalty
 
payable for
 
our Australian
 
Operations from
 
July 1,
 
2022, are
as set out below:
•
 
7% for average coal price per Mt sold up to and including
 
A$ 100 per Mt;
•
 
12.5% for average coal price per Mt sold from A$100 to
 
A$150 per Mt;
•
 
15% for average coal price per Mt sold from A$150 to
 
A$175 per Mt;
•
 
20% for average coal price per Mt sold from A$175 to
 
A$225 per Mt;
•
 
30% for average coal price per Mt sold from A$225 to
 
A$300 per Mt; and
•
 
40% for average coal price per Mt sold above A$300 per
 
Mt.
If new legislation or
 
regulations related to various forms
 
of coal taxation or
 
income or other taxes
 
generally, which
increase our costs or limit our ability to compete
 
in the areas in which we sell coal, or which
 
adversely affect our
key customers, are adopted, or if the
 
basis upon which such duties
 
or taxes are assessed or levied,
 
changes or
is different from that provided by us, our business, financial condition or results of
 
operations could be adversely
affected.
We may be subject
 
to litigation, the disposition
 
of which could negatively
 
affect our profitability and cash
flow
 
in
 
a
 
particular
 
period,
 
or
 
have
 
a
 
material
 
adverse
 
effect
 
on
 
our
 
business,
 
financial
 
condition
 
and
results of operations.
Our profitability or cash flow in
 
a particular period could be affected by
 
an adverse ruling in any litigation that
 
may
be filed against us in the future. In addition, such litigation could have
 
a material adverse effect on our business,
financial condition and results of operations. See Item
 
3. “Legal Proceedings.”
We have no
 
registered trademarks for
 
our Company
 
name used by
 
us in the
 
United States or
 
any other
countries, and failure to obtain those registrations
 
could adversely affect our business.
Although
 
we
 
have
 
filed
 
a
 
trademark
 
application
 
for
 
use
 
of
 
the
 
stylized
 
mark
 
“CORONADO
 
STEEL
 
STARTS
HERE” in the United States and Australia, our applications are still pending
 
and the corresponding mark has not
been registered
 
in
 
the
 
United
 
States
 
or
 
Australia.
 
We
 
have
 
not
 
filed
 
for
 
this
 
or
 
other
 
trademarks
 
in
 
any
 
other
country. During trademark registration proceedings, we may receive rejections. If so, we will have an opportunity
to respond,
 
but we
 
may be
 
unable to
 
overcome such
 
rejections. In
 
addition, Intellectual
 
Property Australia
 
and
the United
 
States Patent
 
and Trademark Office
 
and comparable agencies
 
in many
 
foreign jurisdictions
 
may permit
third parties to oppose pending trademark
 
applications and to seek to
 
cancel registered trademarks. If opposition
or
 
cancellation
 
proceedings
 
are
 
filed
 
against
 
our
 
trademark
 
application,
 
our
 
trademark
 
may
 
not
 
survive
 
such
proceedings,
 
and/or
 
we
 
may
 
be
 
required
 
to
 
expend
 
significant
 
additional
 
resources
 
in
 
an
 
effort
 
to
 
defend
ourselves in the proceedings or identify a suitable substitute
 
mark for future use.
Risks Specific to Our Common Stock
Our certificate of incorporation and bylaws include
 
provisions that may discourage a change in control.
Provisions contained in our amended and restated certificate of incorporation, or certificate of incorporation, and
amended and
 
restated bylaws, or
 
bylaws, and
 
Delaware law
 
could make
 
it more
 
difficult for a
 
third-party to acquire
us,
 
even
 
if
 
doing
 
so
 
might
 
be
 
beneficial
 
to
 
our
 
stockholders.
 
Provisions
 
of
 
our
 
bylaws
 
and
 
certificate
 
of
incorporation impose various procedural and other
 
requirements that could make it
 
more difficult for stockholders
to effect certain corporate actions.
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
70
We have elected not to be governed by Section 203 of the General Corporation Law of
 
the State of Delaware,
 
or
the DGCL (or any successor provision thereto),
 
until immediately following the time at
 
which the EMG Group no
longer beneficially
 
owns in
 
the aggregate
 
shares of
 
our common
 
stock representing
 
at least
 
10% of
 
our voting
stock, in which case we
 
shall thereafter be governed by
 
Section 203 if and
 
for so long as Section
 
203 by its terms
would apply
 
to us.
 
Section 203
 
provides that
 
an interested
 
stockholder,
 
along with
 
its affiliates
 
and associates
(i.e., a stockholder that has
 
purchased greater than 15%,
 
but less than 85%, of
 
a company’s outstanding voting
stock (with
 
some exclusions)),
 
may not
 
engage in
 
a business
 
combination
 
transaction
 
with the
 
company for
 
a
period of three years after buying more than 15% of a company’s outstanding voting stock unless certain criteria
are met or certain other corporate actions are taken by the company.
These provisions could limit the price
 
that certain investors might be willing
 
to pay in the future for
 
shares of our
common stock and may have the effect of delaying
 
or preventing a change in control.
Our
 
certificate
 
of
 
incorporation
 
limits
 
the
 
personal
 
liability
 
of
 
our
 
directors
 
for
 
certain
 
breaches
 
of
fiduciary duty.
Our
 
certificate
 
of
 
incorporation
 
and
 
bylaws
 
include
 
provisions
 
limiting
 
the
 
personal
 
liability
 
of
 
our
 
directors
 
for
breaches
 
of
 
fiduciary
 
duty
 
under
 
the
 
DGCL.
 
Specifically,
 
our
 
certificate
 
of
 
incorporation
 
contains
 
provisions
limiting
 
a
 
director’s
 
personal
 
liability
 
to
 
us
 
and
 
our
 
stockholders
 
to
 
the
 
fullest
 
extent
 
permitted
 
by
 
the
 
DGCL.
Furthermore, our
 
certificate of
 
incorporation provides
 
that no director
 
shall be
 
liable to
 
us and
 
our stockholders
for
 
monetary
 
damages
 
resulting
 
from
 
a
 
breach
 
of
 
fiduciary
 
duty
 
as
 
a
 
director,
 
except
 
to
 
the
 
extent
 
that
 
such
exemption from liability or limitation thereof is
 
not permitted under the DGCL. The principal
 
effect of this limitation
on liability
 
is that
 
a stockholder
 
will be
 
unable to
 
prosecute an
 
action for
 
monetary damages
 
against a
 
director
unless the
 
stockholder can
 
demonstrate a
 
basis for
 
liability that
 
cannot be
 
eliminated under
 
the DGCL.
 
These
provisions, however, should
 
not limit or eliminate our right or any stockholder’s right to seek non-monetary relief,
such as an injunction or rescission,
 
in the event of a
 
breach of a director’s fiduciary duty. These provisions do not
alter a director’s liability under
 
U.S. federal securities laws.
 
The inclusion of these
 
provisions in our certificate
 
of
incorporation may discourage or deter stockholders or management from bringing
 
a lawsuit against directors for
a breach of
 
their fiduciary
 
duties, even
 
though such an
 
action, if successful,
 
might otherwise have
 
benefited us
and our stockholders.
Coronado
 
Group
 
LLC
 
and
 
the
 
EMG
 
Group
 
have
 
substantial
 
control
 
over
 
us
 
and
 
are
 
able
 
to
 
influence
corporate matters.
Coronado Group
 
LLC and
 
the EMG
 
Group have
 
significant
 
influence over
 
us, including
 
control over
 
decisions
that
 
require
 
the
 
approval
 
of
 
stockholders,
 
which
 
could
 
limit
 
the
 
ability
 
of
 
other
 
stockholders
 
to
 
influence
 
the
outcome of stockholders votes.
As of
 
December 31,
 
2022, the
 
EMG Group
 
indirectly held
 
50.4%
of our
 
outstanding shares
 
of common
 
stock.
Therefore, the EMG
 
Group has
 
effective control
 
over the outcome
 
of votes on
 
all matters requiring
 
approval by
stockholders. There is a risk that the interests of the EMG Group could conflict with or differ from our interests or
the interests of
 
other stockholders.
 
In addition, pursuant
 
to the terms
 
of the Stockholder’s
 
Agreement, dated
 
as
of September
 
24, 2018,
 
between us
 
and Coronado
 
Group LLC,
 
or the
 
Stockholder’s Agreement,
 
so long
 
as it
beneficially owns in the aggregate at least 25% of the outstanding shares of our common stock, the EMG Group
will have
 
the ability
 
to exercise
 
substantial control
 
over certain
 
of our
 
transactions,
 
including change
 
of control
transactions,
 
such
 
as
 
mergers
 
and
 
capital
 
and
 
debt
 
raising
 
transactions.
 
See Item
 
5.
 
“Market
 
for
 
Registrant’s
Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities” for a description of the
Stockholder’s Agreement.
Further, pursuant to
 
the terms of the Series A
 
Share, Coronado Group and the
 
EMG Group or its successors
 
or
permitted
 
assigns,
 
as
 
the
 
beneficial
 
owner
 
of
 
the
 
Series A
 
Share,
 
at
 
its
 
option,
 
will
 
have
 
the
 
ability
 
to
 
elect
 
a
specified number of directors, or the Series A Directors, based on
 
the EMG Group’s aggregate level of beneficial
ownership of shares
 
of our common
 
stock. For more
 
details on the
 
ability of Coronado
 
Group and the
 
EMG Group
to elect Series A Directors, as
 
well as the rights of
 
stockholders to participate in the removal
 
of any such Series
A
Directors,
 
see
 
Item 5.
 
“Market
 
for
 
Registrant’s
 
Common
 
Equity,
 
Related
 
Stockholder
 
Matters
 
and
 
Issuer
Purchases of Equity Securities.”
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
71
Moreover, the
 
EMG Group’s beneficial
 
ownership of shares of
 
our common stock may
 
also adversely affect
 
the
price of our
 
common stock
 
to the extent
 
equity investors
 
perceive disadvantages
 
in owning common
 
stock of a
company with a controlling stockholder.
 
In addition, the EMG Group
 
is in the business of making
 
investments in
companies and may, from time to time, acquire interests in businesses that
 
directly or indirectly compete with us,
as well as businesses of our existing or potential significant
 
customers. The EMG Group may acquire or seek
 
to
acquire assets that
 
we seek to
 
acquire and, as
 
a result, those
 
acquisition opportunities
 
may not be
 
available to
us or
 
may be
 
more expensive
 
for us
 
to pursue,
 
and as
 
a result,
 
the interests
 
of the
 
EMG Group
 
may not
 
align
with the interests of our other stockholders.
The EMG Group has the
 
right, subject to certain conditions, to
 
require us to cooperate in
 
a sale of shares
of our common stock held by it (including in the form
 
of CDIs) under the Securities Act.
Pursuant to the Registration
 
Rights and Sell-Down Agreement,
 
dated as of September 24,
 
2018, between us and
Coronado
 
Group LLC,
 
or
 
the
 
Registration
 
Rights
 
and
 
Sell-Down
 
Agreement,
 
Coronado
 
Group LLC
 
(or
 
its
successors
 
or
 
permitted
 
assigns
 
or
 
transferees)
 
has
 
the
 
right,
 
subject
 
to
 
certain
 
conditions,
 
to
 
require
 
us
 
to
cooperate in a
 
sell-down of
 
shares of
 
our common
 
stock or
 
CDIs held by
 
it. By virtue
 
of its majority
 
ownership,
exercising its registration rights and selling a large number of shares or CDIs, Coronado Group LLC could cause
undue volatility in the
 
prevailing market price of
 
our common stock. See
 
Item 5. “Market for Registrant’s Common
Equity, Related Stockholder
 
Matters and Issuer Purchases of Equity Securities.”
Our non-employee directors and their respective
 
affiliates, including the EMG Group, may
 
be able to take
advantage of a corporate opportunity that would otherwise
 
be available to us.
The corporate opportunity
 
and related
 
party transactions provisions
 
in our
 
certificate of incorporation
 
could enable
any
 
of
 
our
 
non-employee
 
directors
 
or
 
their
 
respective
 
affiliates,
 
including
 
the
 
EMG
 
Group,
 
to
 
benefit
 
from
corporate opportunities
 
that might
 
otherwise be
 
available to
 
us. Subject
 
to the
 
limitations of
 
applicable law,
 
our
certificate of incorporation, among other things, will:
•
 
permit
 
us
 
to
 
enter
 
into
 
transactions
 
with
 
entities
 
in
 
which
 
one
 
or
 
more
 
non-employee
 
directors
 
are
financially or otherwise interested;
•
 
permit any non-employee director or
 
his or her affiliates to
 
conduct a business that competes
 
with us and
to make investments in any kind of property in which we
 
may make investments; and
•
 
provide that if
 
any non-employee director
 
becomes aware of
 
a potential business
 
opportunity, transaction
or
 
other
 
matter
 
(other
 
than
 
one
 
expressly
 
offered
 
to
 
that
 
non-employee
 
director
 
solely
 
in
 
his
 
or
 
her
capacity
 
as
 
our
 
director),
 
that
 
non-employee
 
director
 
will
 
have
 
no
 
duty
 
to
 
communicate
 
or
 
offer
 
that
opportunity to
 
us, and
 
will be
 
permitted to
 
communicate
 
or offer
 
that opportunity
 
to his
 
or her
 
affiliates
and pursue or acquire such opportunity for himself
 
or herself, and that non-executive director
 
will not be
deemed
 
to
 
have
 
acted
 
in
 
a
 
manner
 
inconsistent
 
with
 
his
 
or
 
her
 
fiduciary
 
or
 
other
 
duties
 
to
 
us
 
or
 
our
stockholders regarding the opportunity or acted in bad faith or in a manner inconsistent with
 
our and our
stockholders’ best interests.
These provisions enable a
 
corporate opportunity that
 
would otherwise be available
 
to us to be taken
 
by or used
for the
 
benefit of
 
the
 
non-employee
 
directors
 
or their
 
respective
 
affiliates,
 
which
 
include the
 
EMG Group
 
as a
result of the rights granted to it under the Stockholder’s Agreement.
General Risk Factors
Any
 
failure
 
to
 
maintain
 
effective
 
internal
 
control
 
over
 
financial
 
reporting
 
may
 
adversely
 
affect
 
our
financial condition and results of operations.
Our
 
management
 
is
 
responsible
 
for
 
establishing
 
and
 
maintaining
 
adequate
 
internal
 
control
 
over
 
financial
reporting.
 
Internal
 
control
 
over
 
financial
 
reporting
 
is
 
a
 
process
 
designed
 
to
 
provide
 
reasonable
 
assurance
regarding
 
the
 
reliability
 
of
 
financial
 
reporting
 
and
 
the
 
preparation
 
of
 
financial
 
statements
 
in
 
accordance
 
with
generally accepted accounting principles in the United
 
States, or U.S. GAAP.
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
72
During the course of the preparation of our financial statements,
 
we evaluate and correct any deficiencies in
 
our
internal controls over
 
financial reporting. If we
 
fail to maintain an
 
effective system of disclosure
 
or internal controls
over financial
 
reporting, including
 
satisfaction of
 
the requirements
 
of Section
 
404 of
 
the Sarbanes-Oxley
 
Act of
2002, we may not be able to report
 
accurately or timely on our financial results or adequately identify and reduce
fraud. Therefore, the financial condition of our business could be adversely
 
affected, current and potential future
stockholders could lose confidence in us and/or
 
our reported financial results, which may cause
 
a negative effect
on the trading price of our
 
CDIs, and we could be exposed
 
to litigation or regulatory proceedings,
 
which may be
costly or divert management attention.
 
The requirements of
 
being a public company
 
in the United
 
States and Australia may
 
strain our resources,
divert
 
management’s
 
attention,
 
and
 
affect
 
our
 
ability
 
to
 
attract
 
and
 
retain
 
executive
 
management
 
and
qualified board members.
Our CDIs are
 
currently listed on
 
the ASX and
 
we are registered
 
as a foreign
 
company in
 
Australia. As such
 
we
need to ensure continuous compliance with relevant Australian laws
 
and
 
regulations, including the listing rules of
the ASX, as amended from time to time, or the ASX Listing
 
Rules,
 
and certain provisions of the Corporations Act
2001 (Cth), or the Corporations Act.
 
As a U.S.
 
public company, we are subject
 
to the reporting
 
requirements of the
 
Exchange Act, the
 
Sarbanes-Oxley
Act
 
of
 
2002,
 
the
 
Dodd-Frank
 
Wall
 
Street
 
Reform
 
and
 
Consumer
 
Protection
 
Act
 
of
 
2010
 
and
 
other
 
applicable
securities laws, rules and regulations. Compliance with these laws,
 
rules, and regulations may increase our legal
and
 
financial
 
compliance
 
costs,
 
make
 
some
 
activities
 
more
 
difficult,
 
time-consuming,
 
or
 
costly,
 
and
 
increase
demand on
 
our systems
 
and resources.
 
The Exchange
 
Act requires,
 
among other
 
things,
 
that
 
we file
 
annual,
quarterly, and
 
current reports with respect
 
to our business and
 
results of operations. In
 
the absence of a waiver
from the ASX
 
Listing Rules, these
 
SEC periodic reports
 
will be in addition
 
to our periodic
 
filings required by
 
the
ASX Listing
 
Rules.
 
The
 
Sarbanes-Oxley
 
Act of
 
2002 requires,
 
among
 
other things,
 
that we
 
maintain
 
effective
disclosure
 
controls
 
and
 
procedures
 
and
 
internal
 
control
 
over
 
financial
 
reporting.
 
In
 
order
 
to
 
maintain
 
and,
 
if
required, improve our disclosure
 
controls and procedures and
 
internal control over financial
 
reporting to meet this
standard, significant resources and management oversight will be required. As a result, management’s attention
may be diverted from other
 
business concerns and our
 
costs and expenses will increase,
 
which could harm our
business
 
and results
 
of
 
operations,
 
all of
 
which
 
could
 
be magnified
 
during the
 
COVID-19
 
pandemic.
 
We
 
may
need
 
to
 
hire
 
more
 
employees
 
in
 
the
 
future
 
or
 
engage
 
outside
 
consultants,
 
which
 
will
 
increase
 
our
 
costs
 
and
expenses.
In addition, changing laws,
 
regulations, and standards relating to
 
corporate governance and public disclosure
 
are
creating
 
uncertainty
 
for
 
public
 
companies,
 
increasing
 
legal
 
and
 
financial
 
compliance
 
costs
 
and
 
making
 
some
activities more time consuming.
 
These laws, regulations
 
and standards are subject
 
to varying interpretations, in
many cases due to their
 
lack of specificity and,
 
as a result, their
 
application in practice may
 
evolve over time as
new
 
guidance
 
is
 
provided
 
by
 
regulatory
 
and
 
governing
 
bodies.
 
This
 
could
 
result
 
in
 
continuing
 
uncertainty
regarding compliance matters and higher costs necessitated by ongoing revisions to disclosure and governance
practices.
 
We
 
intend
 
to
 
invest
 
resources
 
to
 
comply
 
with
 
evolving
 
laws,
 
regulations
 
and
 
standards,
 
and
 
this
investment may result in increased
 
general and administrative expenses
 
and a diversion of management’s
 
time
and
 
attention
 
from
 
sales-generating
 
activities
 
to
 
compliance
 
activities.
 
If
 
our
 
efforts
 
to
 
comply
 
with
 
new
 
laws,
regulations and standards differ from the activities intended by
 
regulatory or governing bodies due to ambiguities
related
 
to
 
their
 
application
 
and
 
practice,
 
regulatory
 
authorities
 
may
 
initiate
 
legal,
 
administrative
 
or
 
other
proceedings against us and our business may be harmed.
A state
 
court located within
 
the State
 
of Delaware (or, if
 
no state court
 
located within the
 
State of
 
Delaware
has jurisdiction, the
 
federal district court
 
for the District
 
of Delaware) will
 
be, to the
 
extent permitted by
law,
 
the
 
sole
 
and
 
exclusive
 
forum
 
for
 
substantially
 
all
 
state
 
law
 
based
 
disputes
 
between
 
us
 
and
stockholders.
Our bylaws provide
 
that, unless we
 
consent in writing
 
to the selection
 
of an alternative
 
forum, a state
 
or federal
court within the State of Delaware will be the sole and
 
exclusive forum for:
•
 
any derivative action or proceeding brought on our behalf;
•
 
any action or proceeding asserting a claim of breach of
 
a fiduciary duty owed by any director or
 
officer or
other employee or
 
agent of the
 
Company to the
 
Company or the
 
Company’s stockholders or debtholders;
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
73
•
 
any
 
action
 
or
 
proceeding
 
asserting
 
a
 
claim
 
against
 
the
 
Company
 
or
 
any
 
director
 
or
 
officer
 
or
 
other
employee or
 
agent of
 
the Company
 
arising pursuant
 
to any
 
provision of
 
the DGCL
 
or our
 
certificate of
incorporation or bylaws; or
•
 
any action
 
asserting
 
a claim
 
against
 
the
 
Company
 
or
 
any
 
director
 
or
 
officer
 
or
 
other
 
employee
 
of
 
the
Company
 
governed
 
by
 
the
 
internal
 
affairs
 
doctrine
 
or
 
other
 
“internal
 
corporate
 
claims”
 
as
 
defined
 
in
Section 115 of the DGCL.
The choice of
 
forum provision may limit
 
a stockholder’s ability
 
to bring a claim
 
against us or our
 
directors, officers,
employees or
 
agents in
 
a forum
 
that it
 
finds favorable,
 
which may
 
discourage stockholders
 
from bringing
 
such
claims
 
at
 
all.
 
Alternatively,
 
if a
 
court
 
were
 
to
 
find
 
the
 
choice
 
of forum
 
provision
 
contained
 
in
 
our
 
bylaws
 
to
 
be
inapplicable or unenforceable
 
in an action,
 
we may incur
 
additional costs associated
 
with resolving such
 
action
in
 
another
 
forum,
 
which
 
could
 
materially
 
adversely
 
affect
 
our
 
business,
 
financial
 
condition
 
and
 
results
 
of
operations. However, the choice of forum provision does
 
not apply to any actions
 
arising under the Securities Act
or the Exchange Act.
The issuance of additional
 
common stock or securities
 
convertible into our
 
common stock could
 
result
in dilution of the ownership interest in us held by existing
 
stockholders.
We may
 
issue more
 
CDIs in
 
the future
 
in order
 
to fund
 
future investments, acquisitions,
 
capital raising
 
transactions
or
 
to
 
reduce
 
our
 
debt.
 
While
 
we
 
will
 
be
 
subject
 
to
 
the
 
constraints
 
of
 
the
 
ASX
 
Listing
 
Rules
 
regarding
 
the
percentage of our
 
capital that we
 
are able to
 
issue within a
 
12-month period
 
(subject to applicable
 
exceptions),
any such equity raisings may dilute the ownership of existing
 
common stockholders.
 
We are subject to general
 
market risks that are
 
inherent to companies with publicly-traded securities
 
and
the price of our securities may be volatile.
We are subject to
 
the general market risks that
 
are inherent in all
 
securities traded on a
 
securities exchange. This
may result
 
in fluctuations
 
in the
 
trading price
 
of our
 
securities that are
 
not explained
 
by our
 
fundamental operations
and activities. There is
 
no guarantee that the
 
price of our securities
 
will increase in the
 
future, even if our
 
earnings
increase.
Our securities may trade at, above or below the price paid by an investor for those securities due to a number of
factors, including, among others:
•
 
general market conditions, including investor sentiment;
•
 
movements in interest and exchange rates;
•
 
fluctuations in the local and global market for listed stocks;
•
 
actual or anticipated
 
fluctuations in
 
our interim and
 
annual results and
 
those of other
 
public companies
in our industry;
•
 
industry cycles and trends;
•
 
mergers and strategic alliances in the coal industry;
•
 
changes in government regulation;
•
 
potential or actual military conflicts or acts of terrorism;
•
 
changes in accounting principles;
•
 
announcements concerning us or our competitors;
•
 
changes in government policy,
 
legislation or regulation;
•
 
inclusion of our securities in or removal from particular market
 
indices (including S&P/ASX indices); and
•
 
the nature of the markets in which we operate.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
74
Other factors
 
that may
 
negatively affect
 
investor sentiment
 
and influence
 
us, specifically,
 
or the
 
stock market,
more generally, include acts
 
of terrorism, an outbreak of international hostilities, fires, floods, earthquakes,
 
labor
strikes, civil wars,
 
natural disasters, outbreaks of
 
disease, including the COVID-19
 
pandemic, or other man-made
or natural events.
Stock markets have
 
experienced extreme price
 
and volume fluctuations
 
in the past
 
that are
 
often disproportionate
or
 
unrelated
 
to
 
the
 
operating
 
performance
 
of
 
companies.
 
There
 
can
 
be
 
no
 
guarantee
 
that
 
trading
 
prices
 
and
volumes of any securities
 
will be sustained. These
 
factors may materially affect the
 
market price of our
 
securities,
regardless of our
 
operational performance. This
 
may then significantly
 
impact our ability
 
to raise new
 
equity which
may be required to fund our operations if our financial
 
performance deteriorates due to other factors.
The payment of
 
dividends and repurchases
 
of our stock
 
are dependent on
 
a number
 
of factors, and
 
future
payments and repurchases cannot be assured.
The
 
payment
 
of
 
dividends
 
in
 
respect
 
of
 
our
 
common
 
stock
 
is
 
impacted
 
by
 
several
 
factors,
 
including
 
our
profitability,
 
retained earnings,
 
capital requirements
 
and free
 
cash flow,
 
as well
 
as applicable
 
covenants under
the indenture
 
governing our
 
senior secured
 
notes and
 
covenants under
 
the ABL
 
Facility.
 
Any future
 
dividends
will be determined by
 
our Board of Directors having
 
regard to these factors,
 
among others. There is
 
no guarantee
that any dividend
 
will be paid,
 
or repurchases will
 
be made, by
 
us, or if
 
paid, paid at
 
previous levels. From
 
time
to time, our Board of Directors may also cancel previously
 
announced dividends.
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
75
ITEM 1B. UNRESOLVED
 
STAFF COMMENTS
None.
 
c561202210Kp76i0
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
76
ITEM 2.
 
PROPERTIES
 
Summary Overview of Mining Operations
Coronado owns and controls a portfolio of operating mines and development projects in Queensland, Australia, and Virginia,
West
 
Virginia
 
and
 
Pennsylvania
 
in
 
the
 
United
 
States.
 
Our
 
Australian
 
Operations
 
consist
 
of
 
the
 
100%-owned
 
Curragh
producing
 
mine
 
complex.
 
With
 
respect
 
to
 
our
 
U.S.
 
Operations,
 
Coronado
 
owns
 
a
 
100%
 
interest
 
in
 
two
 
producing
 
mine
complexes (Buchanan and Logan) and
 
a 100% interest in one
 
temporarily idled, production-stage mine complex
 
(Greenbrier)
and two
 
development properties
 
(Mon Valley
 
Minerals (formerly
 
called Pangburn-Shaner-Fallowfield)
 
and Russell
 
County).
 
Figures 1 and 2 below show the locations of our mining properties in Australia and the United States, respectively.
Figure 1: Australian Operations:
c561202210Kp77i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
c561202210Kp77i1
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
77
14.7
10.5
25.2
13.6
12.8
26.4
12.4
13
25.3
Australia
United States
Group
ROM production (Mt)
FY20
FY21
FY22
12.0
5.1
17.0
11.1
6.3
17.4
9.8
6.2
16.0
Australia
United States
Group
Saleable production (Mt)
FY20
FY21
FY22
Figure 2: U.S. Operations:
The below charts show run-of-mine, or ROM, production and saleable production for our Australian Operations and our U.S.
Operations for the years ended December 31, 2022, 2021 and 2020.
See the descriptions
 
of our material
 
mining properties under
 
“—Curragh,” “—Buchanan,” “—Logan”
 
and “—Mon Valley” below
for more information. Table
 
1 below contains a
 
summary of the key
 
information relative to the
 
various Coronado properties.
 
Tables
 
2 and 3 provide a summary of our coal resources and reserves, respectively, as of December 31, 2022.
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
78
Table 1.
 
Summary Coronado Properties
Property
(Property
Stage)
Mineral Rights
(1)
Permit
Status
(2)
Mine Type(s)
Coal Type
Coal Seams of
Economic
Interest
(Formation)
Processing
Plants/
Facilities
Curragh
(Production)
25,586 hectares
leased; 6,381
hectares owned
Permitted
Surface
HCC, SCC,
PCI, Thermal
Various (Rangal
Coal Measures)
CPP1 - 1100 raw
Mt per hour;
CPP2 - 1200 raw
Mt per hour; Rail
Loadout
Buchanan
(Production)
25,852 hectares
leased
(3)
; 7,725
hectares owned
1 Permit
Underground
Low-Vol
Pocahontas #3
(Pocahontas
Formation)
CPP - 1270 raw
Mt per hour; Rail
Loadout
Logan
(Production)
13,183 hectares
leased
(3)
; 69
hectares owned
24 Permits
Surface &
Underground
HVA, HVB,
Thermal
Various
(Kanawha
Formation)
CPP – 1088 raw
Mt per hour; Rail
Loadout
Mon Valley
(Development)
1,339 hectares
leased
(3)
; 40,276
hectares owned
Not
Permitted
Underground
(4)
High-Vol
Upper Freeport
(Freeport
Formation)
Future
Greenbrier
(Production -
Idled)
18,907 hectares
leased
(3)
22 Permits
Surface &
Underground
Mid-Vol, PCI,
Thermal
Pocahontas #6,
#7, #8
(Pocahontas
Formation);
Various (New
River Formation)
CPP - 544 raw Mt
per hour; Rail
Loadout
Russell County
(Development)
7,111
 
hectares
leased
(3)
; 378
hectares owned
Not
Permitted
Underground
(4)
High-Vol
Lower Castle
(Norton
Formation);
Upper Horsepen
(Middle Lee
Formation)
Future
(1)
 
We are
 
not aware of
 
any significant encumbrances or
 
defects in title
 
with respect to
 
any of our
 
mining properties.
 
Certain credit
facilities of the Company are secured by a lien on
 
substantially all of the Company’s assets, including
 
mining properties.
(2)
 
We believe we
 
have secured
 
all applicable
 
environmental licenses
 
and permits
 
under applicable
 
law and
 
have all
 
necessary permits
and licenses regarding cultural heritage, native
 
title and various other social issues to support
 
current mining operations.
(3)
 
Subject to the exercise of our renewal rights thereunder, most of the leases at our U.S. mining properties expire upon exhaustion
of the relevant reserves.
(4)
 
Proposed mine type.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
79
Table 2.
 
Summary Coal Resources Exclusive of Reserves at End of the Fiscal Year Ended December 31, 2022.
(1)
Coal Resources (In Situ, MMt)
(2)
Quality (Air-Dried Basis)
Measured
Indicated
Measured
+
Indicated
Inferred
Ash
Sulfur
Volatile
Matter
Australia
Curragh
328
184
512
142
19.5%
0.5%
18.4%
Total
 
Australia
328
184
512
142
United States
Buchanan
34
6
40
—
25.0%
0.7%
16.0%
Logan
45
37
82
3
24.0%
1.0%
28.0%
Mon Valley
—
—
—
—
—
—
—
Greenbrier
19
14
33
—
31.0%
1.1%
20.0%
Russell County
40
4
44
—
29.0%
0.7%
23.0%
Total
 
United States
138
61
199
4
Total
466
245
711
147
(1)
 
For more
 
information regarding price
 
assumptions used
 
in the
 
calculation of
 
coal resources
 
as of
 
December 31,
 
2022, see
 
the
individual property disclosures below.
(2)
 
Australian resources are estimated inclusive of 5.3%
 
in-situ moisture.
 
United States resources are estimated on a
 
dry basis.
(3)
 
Some numerical figures in the
 
above table have been subject
 
to rounding adjustments. Accordingly,
 
numerical figures shown as
totals may not equal the sum of the figures that
 
precede them.
 
Table 3.
 
Summary Coal Reserves (Marketable Sales Basis) at End of the Fiscal Year Ended December 31, 2022.
(1)
Demonstrated Coal Reserves (Wet
Tons,
Washed or Direct Shipped, MMt)
(2)
Quality (Air-Dried Basis)
Proven
Probable
Total
Ash
Sulfur
Volatile
Matter
Australia
Curragh
188
18
205
10.7%
0.4%
19.0%
Total
 
Australia
188
18
205
United States
Buchanan
88
5
93
6.0%
0.7%
19.0%
Logan
53
17
71
8.0%
0.9%
36.0%
Mon Valley
78
57
134
8.0%
1.2%
35.0%
Greenbrier
4
2
7
8.0%
1.0%
26.0%
Russell County
24
5
29
8.0%
0.9%
31.0%
Total
 
United States
247
87
334
Total
435
105
539
(1)
 
For more
 
information regarding
 
price assumptions
 
used in
 
the calculation
 
of coal
 
reserves as
 
of December
 
31, 2022,
 
see the
individual property disclosures below.
(2)
 
For more information regarding moisture assumptions used in the calculation of coal
 
reserves as of December 31, 2022, see the
individual property disclosures below.
(3)
 
Some numerical figures in the
 
above table have been subject
 
to rounding adjustments. Accordingly,
 
numerical figures shown as
totals may not equal the sum of the figures that
 
precede them.
 
Curragh
Curragh is a
 
production-stage mining
 
property that consists
 
of two active,
 
open-pit, surface mines
 
(Curragh North and
 
Curragh
Main).
 
Coal mine development at the Curragh property is presently accomplished by surface mining methods and has been
so historically
 
since the mine’s
 
inception.
 
Curragh coals are
 
widely known
 
for their low
 
ash, low to
 
mid volatile matter,
 
low
sulfur and low
 
phosphorous content. Curragh Met
 
coal products are
 
also known for their
 
consistent delivered quality,
 
which
supports a consistent offtake across a diversified market base.
 
A map of Curragh is shown in Figure 3.
c561202210Kp80i0
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
80
Figure 3.
 
Coronado Curragh Mine Complex Property Location Map.
The
 
Curragh
 
mine
 
complex
 
is
 
located
 
within
 
the
 
Bowen
 
Basin
 
coalfields,
 
approximately
 
200
 
kilometers
 
by
 
road
 
west
 
of
Rockhampton,
 
Queensland,
 
Australia,
 
and
 
approximately
 
14 kilometers
 
north
 
of
 
the
 
town
 
of
 
Blackwater,
 
Queensland,
Australia. The coordinates of CPP1, which is located within Curragh Main, are 688,561 meters
 
East, 7,400,933 meters North
in
 
the
 
AMG66
 
grid
 
system.
 
Curragh
 
owns
 
and
 
operates
 
the
 
necessary
 
CPPs
 
and
 
load-out
 
system
 
for
 
dispatches
 
via
Blackwater
 
rail
 
line
 
to
 
the
 
Port
 
of
 
Gladstone
 
or
 
the
 
Stanwell
 
Power
 
Station.
 
See
 
Item
 
1.
 
“Business—Transportation—
Australian Operations” for
 
additional information regarding the
 
rail and port services
 
available to Curragh. Curragh
 
also has
maintenance
 
facilities
 
for
 
the
 
fleet
 
of
 
mining
 
equipment,
 
as
 
well
 
as
 
office
 
buildings
 
for
 
the
 
mine
 
staff
 
and
 
personnel.
 
Established
 
sealed
 
roads
 
connect
 
the
 
mine
 
to
 
the
 
town
 
of
 
Emerald,
 
Queensland,
 
Australia,
 
to
 
the
 
west
 
and
 
the
 
Port
 
of
Gladstone to the east.
 
Third-party rail providers operate
 
the Blackwater rail line
 
and transport Curragh export
 
coal, for sale
to international customers, to the RG Tanna
 
Coal Terminal
 
or Wiggins Island Coal Export Terminal
 
at the Port of Gladstone.
 
Curragh domestic coal is loaded onto train wagons for transportation to the Stanwell Power Station for power generation.
Curragh has ready access to water,
 
electricity and personnel to support its operations.
 
SunWater Ltd. supplies water to
 
the
mine complex from the Fairbairn Dam via the Bedford Weir.
 
The mine complex also recycles water from on-site dams—i.e.,
old open-cut pits that capture rainfall and water from
 
dewatering activities.
 
Curragh has a dedicated 66-kilovolt, or kV, power
supply to support the
 
mining operations with a
 
capacity of up to
 
57-megawatt, or MW, sourced from the
 
main grid power.
 
The
substation is
 
located on
 
the southwest
 
corner of
 
ML1878 with
 
both 66kv and
 
22kv distribution
 
networks to
 
supply the
 
draglines,
shovel and CPP.
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
81
The Mineral
 
Resources Act
 
1989
 
(Qld), or
 
MRA, and
 
the Mineral
 
and Energy
 
Resources (Common
 
Provisions) Act
 
2014
(Qld), or MERCPA, together,
 
provide for the assessment, development and utilization of mineral resources in Queensland to
the maximum extent
 
practicable, consistent with sound
 
economic and land use
 
management. The MRA vests
 
ownership of
minerals, with
 
limited exceptions, in
 
the “Crown,”
 
which in
 
relation to Curragh,
 
is the
 
Queensland Government.
 
A royalty is
payable to the Queensland Government for the right to extract minerals. The MRA also creates different tenures for different
mining activities, such
 
as prospecting, exploring
 
and mining. A
 
ML is the
 
most important tenure, as
 
it permits the
 
extraction
of minerals in conjunction with other required authorities. The MRA imposes general conditions on an ML.
We control the
 
coal mining rights at
 
Curragh under 14 coal
 
and infrastructure MLs
 
and three MDLs granted
 
pursuant to the
MRA.
 
We
 
refer
 
to
 
the
 
MLs
 
and
 
MDLs
 
at
 
Curragh,
 
collectively,
 
as
 
the
 
Tenements.
 
Renewal of
 
certain
 
Tenements
 
will be
required
 
during the
 
mine
 
life of
 
Curragh and
 
the Queensland
 
government can
 
vary
 
the terms
 
and conditions
 
on
 
renewal.
There are a number
 
of existing mining and
 
petroleum tenements which overlap
 
with the Tenements. The priority, consent and
coordination requirements under the MRA, MERCPA and the Petroleum and Gas (Production and
 
Safety) Act 2004 (Qld) (as
relevant) may apply
 
with respect to
 
those overlaps.
 
Extensive statutory protocols
 
govern the relationships
 
between co-existing
mining and
 
exploration rights and
 
these protocols
 
are largely focused
 
on encouraging the
 
overlapping tenement
 
holders to
negotiate and formulate arrangements that enable the
 
co-existence of their respective interests. To date, we have negotiated
arrangements
 
in place
 
with all
 
of
 
our
 
overlapping
 
tenement holders
 
and full
 
access
 
to
 
all of
 
our
 
Tenements.
See
 
Item 1.
“Business—Regulatory Matters—Australia—Tenements”
 
for additional information regarding Curragh mining tenements.
Property control and mining rights at Curragh are entirely expressed in the MLs and MDLs mentioned in Item 1. “Business—
Regulatory
 
Matters—Australia—Tenements.”
 
An
 
overlapping
 
petroleum
 
tenure
 
exists
 
over
 
the
 
southern
 
extents
 
of
 
the
Tenements.
 
Under the Mineral
 
and Energy Resources (Common
 
Provisions) Act 2014
 
(Qld), this requires annual
 
information
exchanges, including
 
the provision and
 
maintenance of joint
 
information management
 
plans with the
 
overlapping tenement
holder.
 
Curragh is compliant with the legislation and there are no current restrictions to coal mining.
As conditions to certain
 
of the Tenements,
 
Curragh is subject to
 
royalties payable to the
 
Queensland government on a
 
new
regulated tiered structure
 
introduced 1st July
 
2022. This tiered
 
royalty payment regime is
 
dependent on the
 
received AUD/t
revenue received from the coal sales, and varies from 7% for up to A$100/t sales, up to 40% payable for
 
sales over A$300/t.
These royalties are
 
in addition to
 
the Stanwell rebate,
 
as described in
 
Item 1. “Business—Customers—Stanwell.” Additionally,
if MDL
 
162 advances
 
from development
 
to production,
 
we would
 
be required
 
to pay
 
under
 
a private
 
royalty deed
 
a base
royalty of A$0.50 per Mt of coal and a royalty of A$0.70 for every Mt of SCC produced above 2.5 MMt per year.
A joint
 
venture
 
between
 
Arco Australia
 
Ltd., Australian
 
Consolidated Industries
 
Ltd.,
 
R.W.
 
Miller
 
& Co.
 
and Mitsui
 
& Co.
(Australia) first began development on certain of the Tenements in 1983.
 
Later, Arco Australia Ltd. bought out the other joint
venturers and, in 2000, sold the Property to Wesfarmers Ltd. In 2014,
 
Wesfarmers acquired MDL 162 from Peabody Budjero
Pty
 
Ltd.
 
Coronado
 
acquired
 
all
 
the
 
Tenements
 
from
 
Wesfarmers
 
Ltd.
 
in
 
March
 
2018.
 
Production
 
history
 
has
 
been
approximately 12.0 MMt in 2020, 11.1 MMt in 2021 and 9.8 MMt in 2022.
Beginning in the 1960’s, various tenement holders began
 
prospecting and exploratory drilling at Curragh. We currently have
an
 
active,
 
ongoing exploration
 
program
 
at
 
Curragh that
 
allows us
 
to update
 
and
 
refine the
 
geological
 
model ahead
 
of pit
development.
 
Coal
 
mine
 
development
 
at
 
the
 
Curragh
 
property
 
is
 
presently
 
accomplished
 
by
 
surface
 
mining
 
methods
 
and
 
has been
 
so
historically since
 
the mine’s inception.
 
The mine
 
characteristics and output
 
levels allow
 
it to
 
be ranked
 
as a
 
large coal
 
operation
when compared to domestic producers in Australia and worldwide.
 
Curragh operates four large electric draglines, one large
electric shovel
 
and a fleet
 
of smaller contractor
 
excavators.
 
Contractors are employed
 
for the
 
pre strip, post
 
strip and coal
mining activities. Contract highwall mining operations has commenced at Curragh North during the 2022 calendar year.
Curragh
 
has
 
two
 
coal
 
preparation
 
plants
 
CPP1
 
and
 
CPP2.
 
CPP1
 
is
 
the
 
oldest
 
of
 
the
 
two
 
processing
 
plants
 
and
 
has
 
a
documented nameplate
 
capacity of
 
1100
 
tph (as
 
received).
 
CPP2 has
 
a documented
 
nameplate capacity
 
of 1200
 
tph (as
received) with a capability of up to 1350 tph when processing selected
 
feed types.
 
Curragh has a loadout facility for loading
coal onto railcars, which is connected to the main Blackwater rail link.
Generally, the mining equipment and
 
facilities at Curragh
 
are in good
 
operating condition. We
 
focus on the
 
long-term potential
of
 
the
 
mine
 
complex
 
and
 
regularly
 
monitor
 
developments
 
in
 
the
 
mining
 
industry
 
for
 
technology
 
improvements
 
and
 
new
equipment
 
that
 
could
 
help
 
us
 
increase
 
efficiency
 
and
 
lower
 
our
 
costs.
 
Curragh’s
 
oldest
 
mining
 
equipment,
 
including
 
two
draglines, began operations in 1983. All of the
 
draglines have additional boom (stress) monitoring systems, which
 
allow us to
increase their
 
total suspended
 
load capacities,
 
and still
 
achieve over
 
90% mechanical
 
availability.
 
Prior to
 
our taking
 
over
mining operations, Wesfarmers Ltd. made improvements to the processing facilities at Curragh, including the commissioning
of the
 
second CPP
 
in 2012
 
and replacing
 
the raw
 
coal crushing
 
system at
 
Curragh Main
 
with an
 
updated circuit
 
in 2016.
Wesfarmers
 
Ltd. also
 
started a
 
corrosion and
 
structural
 
repair program
 
over ten
 
years ago
 
that we
 
have
 
continued since
acquiring the
 
mine complex.
 
This program
 
helps us
 
ensure that
 
the assets
 
are available
 
well into
 
the future.
 
From time
 
to
time,
 
we
 
also
 
update
 
and
 
improve
 
other
 
equipment
 
and
 
facilities
 
to
 
maintain
 
their
 
usefulness
 
and
 
optimize
 
our
competitiveness. As of
 
December 31, 2022,
 
the book value of
 
Curragh and its
 
associated plant and equipment
 
was $761.8
million.
We are not
 
aware of
 
any significant encumbrances
 
or defects
 
in title with
 
respect to
 
the Property.
 
We believe we
 
have secured
all applicable environmental
 
licenses and permits
 
under both
 
Queensland and Australian
 
Commonwealth legislation and
 
have
all
 
permits
 
and
 
licenses
 
regarding
 
cultural
 
heritage,
 
native
 
title
 
and
 
various
 
other
 
social
 
issues.
 
See
 
Item
 
1.
 
“Business—
Regulatory Matters—Australia” for a discussion of the permitting conditions applicable to Curragh.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
82
Summaries
 
of Curragh’s
 
coal resources
 
and reserves
 
as of
 
December 31,
 
2022
 
and 2021
 
are shown
 
in Tables
 
4 and
 
5,
respectively.
Table 4.
 
Curragh – Summary
 
of Coal Resources
 
Exclusive of Reserves
 
at the End
 
of the Fiscal
 
Year Ended December
31, 2022 and 2021.
(1)
Coal Resources
(Wet Tons, In Situ, MMt)
(2)(3)(4)
Quality (Air-Dried Basis)
Measured
Indicated
Measured
+
Indicated
Inferred
Ash
Sulfur
Volatile
Matter
December 31, 2022
328
184
512
142
19.5%
0.50%
18.4%
December 31, 2021
328
184
512
142
19.5%
0.50%
18.4%
(1)
 
Curragh splits the resource into
 
areas that are above and
 
below a 15:1 open cut
 
stripping ratio and considers
 
the lower ratio areas
as
 
suitable for
 
open cut
 
mining at
 
the
 
higher ratio
 
areas as
 
suitable for
 
underground mining.
 
The
 
average sales
 
price for
 
the
underground resources was estimated to be $147 per Mt (FOB).
 
Pricing for resources is described in Section 11.5 of the Curragh
TRS.
(2)
 
There are
 
resources suitable
 
for open
 
cut mining
 
outside of
 
reserves. Pricing
 
for resources
 
is described
 
in Section
 
11.5
 
of the
Curragh TRS.
 
Based on assumed long-term average sales price of $143 per Mt (FOB) representing the long-term average price
forecast for Curragh based on independent price
 
forecasts.
(3)
 
Table 1-1 of the Curragh TRS provides a summary of Curragh resource tons inclusive of
 
reserve tons as of December 31, 2021.
(4)
 
Reported on a 5.3% in-situ moisture basis.
 
(5)
 
Some numerical figures in the
 
above table have been subject
 
to rounding adjustments. Accordingly,
 
numerical figures shown as
totals may not equal the sum of the figures that
 
precede them.
Table
 
5.
 
Curragh
 
–
 
Summary
 
of
 
Coal
 
Reserves
 
(Marketable
 
Sales
 
Basis)
 
at
 
the
 
End
 
of
 
the
 
Fiscal
 
Year
 
Ended
December 31, 2022 and 2021.
(1)
Demonstrated Coal Reserves (Wet
Tons, Washed
or Direct Shipped, MMt)
(2)
Quality (Air-Dried Basis)
Proven
Probable
Total
Ash
Sulfur
Volatile
Matter
December 31, 2022
188
18
205
10.7%
0.4%
19.0%
December 31, 2021
198
18
215
10.7%
0.4%
19.0%
(1)
 
Based on pricing data as provided by
 
Coronado described in Section 16 of the
 
Curragh TRS. The pricing data assumes average
realized price of $141 per Mt sold over the LOM.
(2)
 
Reported on an 11.0% moisture basis.
(3)
 
Some numerical figures in the
 
above table have been subject
 
to rounding adjustments. Accordingly,
 
numerical figures shown as
totals may not equal the sum of the figures that
 
precede them.
From December 31, 2021 to
 
December 31, 2022, total reserves decreased
 
by approximately 5%, from approximately 215.0
MMt to approximately 205.0 MMt. The decrease in total reserves is attributable to mining depletion.
Barry Lay,
 
BSc Geology (Hons); MAusIMM of
 
Resology Pty Ltd, and
 
Paul Wood, B. Eng.;
 
MAusIMM(CP), who is employed
full-time as
 
the Senior Life
 
of Mine Planner
 
of our
 
subsidiary,
 
Coronado Curragh, whom
 
we refer
 
to as the
 
Australian QPs,
prepared the estimates
 
of coal
 
resources and reserves
 
summarized in Tables 4 and
 
5.
 
A copy of
 
the Australian
 
QPs’ technical
report summary,
 
or
 
TRS, with
 
respect
 
to Curragh,
 
dated
 
February 21,
 
2022, or
 
the Curragh
 
TRS, is
 
filed
 
as Exhibit
 
96.1
hereto. Neither Mr. Barry Lay nor Resology Pty Ltd is affiliated with Coronado.
 
The
 
Australian
 
QPs prepared
 
the
 
estimates
 
of
 
coal
 
resources
 
and
 
reserves
 
using
 
drilling
 
data
 
available
 
from
 
exploration
activities at Curragh conducted by numerous entities over time.
 
Most of this information was obtained prior to
 
our acquisition
of the Property,
 
using varying drilling
 
and core-logging techniques,
 
survey methods and
 
testing procedures.
 
As a result,
 
in
verifying
 
the
 
data,
 
the
 
Australian
 
QPs
 
made
 
certain
 
assumptions
 
about
 
the
 
adequacy
 
of
 
the
 
processes
 
performed
 
and
comparability of the data based on their professional experience and familiarity with Curragh.
Per Section
 
12.1 of the
 
Curragh TRS, coal
 
reserves were classified
 
as proven
 
or probable considering
 
“modifying factors,”
including mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors.
 
Section 22.2 of
the Curragh
 
TRS includes
 
a risk
 
assessment of
 
the key
 
modifying factors
 
that could
 
potentially impact
 
the operations
 
and
therefore the estimate of coal reserves and resources.
c561202210Kp83i0
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
83
As
 
summarized
 
in
 
Section
 
7.1
 
of
 
the
 
Curragh
 
TRS,
 
the
 
concentration
 
of
 
exploration
 
drill
 
holes
 
varies
 
slightly
 
across
 
the
Property.
 
The location of
 
the drilling is
 
shown on the
 
maps included in
 
Section 7.
 
Points of observation
 
include exploration
drill holes and mine measurements, which
 
have been fully vetted and processed
 
into a geologic model. The geologic model
is based on seam depositional
 
modelling, the interrelationship of overlying
 
and underlying strata on seam
 
mineability, seam
thickness trends,
 
the impact
 
of seam
 
structure (i.e.,
 
faulting), intra-seam
 
characteristics, etc.
 
Section 11.6
 
of the
 
Curragh
TRS summarizes the drill hole spacings and accuracy associated with each resource category.
Coal quality is instrumental in
 
determining the viability of a
 
coal deposit. As per Table
 
11-1 of
 
the Curragh TRS, coal quality
conforms to international standards. These quality attributes aided in converting in-place tons to demonstrated coal reserves
(recoverable washed tons). Pricing data as provided by Coronado
 
is described in Table 16-1 of the Curragh TRS.
 
These are
weighted-average values across the LOM schedule.
Regarding
 
production
 
rates
 
as
 
described
 
in
 
Section 13
 
of
 
the
 
Curragh
 
TRS,
 
the
 
mine
 
plan
 
and
 
productivity
 
expectations
consider
 
historical
 
performance
 
and
 
efforts
 
have
 
been
 
made
 
to
 
adjust
 
the
 
plan
 
to
 
reflect
 
current
 
technology
 
and
 
future
conditions.
 
Mine
 
development and
 
operation
 
have
 
not been
 
optimized within
 
the Curragh
 
TRS.
 
Additional mine-specific
factors can be found in Section 13 of the Curragh TRS.
Buchanan
Buchanan is
 
a production-stage
 
mining property,
 
consisting of
 
one active
 
underground mine
 
and supporting
 
infrastructure
that produces
 
Low-Vol
 
Met coal
 
using the
 
longwall mining
 
method.
 
The mine
 
complex is
 
located in
 
Buchanan County
 
in
southwest Virginia.
 
A map of Buchanan is shown in Figure 4.
Figure 4.
 
Coronado Buchanan Mine Complex Property Location Map.
The
 
Buchanan
 
mine
 
complex
 
is
 
located
 
approximately 6.4
 
kilometers
 
southeast
 
of
 
Oakwood,
 
Virginia,
 
and
 
16
 
kilometers
southeast
 
of
 
Grundy,
 
Virginia.
 
The
 
coordinates
 
of
 
the
 
Buchanan
 
CPP
 
are
 
latitude
 
37°
 
09'
 
40"
 
and
 
longitude
 
81°
 
59'
 
13"
(Easting
 
984,100’,
 
Northing 320,100’
 
–
 
in the
 
VA
 
State Plane
 
South
 
NAD 27
 
grid system).
 
The
 
nearest major
 
population
centers
 
are
 
Roanoke,
 
Virginia,
 
and
 
Lexington,
 
Kentucky,
 
which
 
are
 
about
 
153
 
kilometers
 
northeast
 
and
 
290
 
kilometers
northwest of
 
the property,
 
respectively.
 
From U.S.
 
Route 460,
 
which runs
 
through Oakwood,
 
a well-developed
 
network of
improved and
 
unimproved roads
 
provides access
 
to the
 
property.
 
The surface
 
facilities at
 
Buchanan are
 
located along
 
a
Norfolk Southern
 
rail line,
 
which serves
 
as the
 
primary means
 
of transport
 
for produced
 
coal.
 
Norfolk Southern
 
transports
coal from
 
the Buchanan
 
mine complex
 
either to
 
domestic customers
 
or to
 
Lamberts Point
 
Coal Terminal
 
Pier 6
 
in Norfolk,
Virginia, for overseas shipment.
Buchanan has ready access
 
to water,
 
electricity and personnel to
 
support its operations.
 
The mine complex
 
sources water
from streams
 
that flow
 
over Company-owned
 
property.
 
The mine
 
also utilizes
 
ground water
 
from an
 
old abandoned
 
mine.
 
Electricity
 
is
 
sourced
 
from
 
American
 
Electric
 
Power.
 
Personnel
 
have
 
historically
 
been
 
sourced
 
from
 
the
 
surrounding
communities in
 
Buchanan, Tazewell,
 
McDowell and
 
Pike Counties and
 
have proven
 
to be adequate
 
in numbers to
 
operate
the mine complex.
 
As mining is common in the surrounding areas,
 
the workforce is generally familiar with mining
 
practices,
and many are experienced miners.
 
The property mineral rights
 
are composed of approximately 33,577
 
total hectares, of which 25,852
 
are leased or subleased
from private landholders under
 
approximately 150 individual coal
 
lease tracts, and
 
7,725 hectares are owned
 
by Coronado.
 
Subject to
 
Coronado’s exercising
 
its renewal
 
rights thereunder,
 
all the
 
leases expire
 
upon exhaustion
 
of the
 
relevant coal
reserves, which is expected to occur in 2044.
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
84
Under the
 
terms of the
 
relevant leases, we
 
are required
 
to pay
 
royalties ranging
 
from 4% to
 
6% of
 
the selling
 
price of coal
mined from the
 
corresponding leasehold and,
 
for the majority,
 
an annual minimum
 
royalty, irrespective
 
of production.
 
Coal
produced
 
at
 
Buchanan,
 
however,
 
is
 
not
 
subject
 
to
 
“wheelage
 
fees”
 
(i.e.,
 
fees
 
payable
 
on
 
coal
 
mined
 
and
 
removed
 
from
properties other than the particular leasehold and hauled across the leasehold premises).
The
 
property
 
was
 
formerly
 
controlled
 
by
 
Consolidation
 
Coal
 
Company,
 
or
 
CONSOL.
 
Mine
 
development
 
was
 
started
 
by
CONSOL in 1983 and
 
longwall production began in
 
1987.
 
Coronado acquired the Buchanan Mine
 
from CONSOL in March
2016.
 
Production history has been approximately 3.4 MMt in 2020, 4.4 MMt in 2021 and 3.9 MMt in 2022.
Our right to
 
commercially mine and
 
recover coal reserves
 
at Buchanan overlaps
 
with the right
 
of an affiliate
 
of CNX Resources
Corporation, which we refer to as the Gas Party, to commercially recover and develop coal gas interests from the mine area.
 
The
 
Gas
 
Party
 
and
 
we
 
have
 
entered
 
into
 
certain
 
agreements
 
to
 
regulate
 
the
 
interaction
 
between,
 
and
 
coordinate,
 
our
respective operations.
 
In general,
 
the combination
 
of these
 
overlapping interests
 
allows for
 
mutual benefits
 
to the
 
parties,
namely,
 
the degassing of our
 
coal mining operations
 
in the mine,
 
which helps assure the
 
safety of mine personnel,
 
and the
Gas Party’s
 
commercial capture and
 
sale of the
 
coal gas.
 
In addition, the
 
Gas Party’s drilling
 
activities have contributed
 
to
exploration efforts with respect to coal
 
deposits at Buchanan.
 
As the only natural gas supplier
 
in the area, we purchase our
requirements of natural gas for the operation of our thermal dryer at Buchanan from the Gas Party.
 
Before Coronado
 
took over
 
mining operations
 
at Buchanan,
 
CONSOL Energy
 
had conducted
 
extensive exploration
 
of the
property.
 
We have
 
continued exploration
 
at the
 
property through
 
a program
 
of core
 
drilling to
 
confirm reserves,
 
establish
additional resources and assess the geotechnical viability of mining.
 
Buchanan produces
 
primarily a
 
Low-Vol
 
HCC, but
 
it also
 
produces a
 
premium Low-Vol
 
PCI product.
 
The Buchanan
 
mine
extracts coal from the Pocahontas #3 seam of the Pennsylvanian-age Pocahontas Formation, which is the principal minable
coal seam of that formation.
 
The seam is situated
 
below drainage throughout the
 
Property and is accessed
 
by vertical shafts.
 
The seam thickness averages 1.58 meters within the mining area.
 
The Buchanan mine extracts coal using a single longwall system supported by six continuous miner sections, which develop
main
 
entries
 
and
 
gate
 
roads
 
in
 
preparation
 
for
 
the
 
longwall.
 
Each
 
continuous
 
miner
 
section
 
is
 
equipped
 
with
 
one
 
or
 
two
continuous miners, two
 
roof bolters and two
 
or three coal
 
haulage units.
 
After extraction, a
 
series of conveyor
 
belts deliver
raw coal
 
to an
 
underground storage
 
bunker.
 
The Buchanan
 
mine complex
 
uses a
 
skip hoist
 
system to
 
lift raw
 
coal to
 
the
surface.
 
Buchanan has
 
a CPP
 
that processes
 
raw coal
 
at a
 
rate of
 
approximately 1,270
 
raw tph,
 
as well
 
as the
 
other necessary
support infrastructure, including loadout and portal facilities.
Generally,
 
the mining
 
equipment
 
and
 
facilities
 
at
 
Buchanan
 
are
 
in
 
good
 
operating
 
condition.
 
We
 
focus
 
on
 
the
 
long-term
potential of the
 
mine complex and
 
regularly monitor developments
 
in the mining
 
industry for technology
 
improvements and
new equipment that could
 
help us increase efficiency
 
and lower our costs.
 
Since acquiring the Buchanan
 
operations, we have
implemented improvements at
 
the CPP,
 
which have resulted
 
in increased capacity.
 
From time to
 
time, we also
 
update and
improve other equipment
 
and facilities to
 
maintain their usefulness
 
and optimize our
 
competitiveness. For example,
 
we rebuild
our longwall shear, drives
 
and cycling shields
 
after every panel.
 
We have also
 
entered into life
 
cycle management agreements
for
 
our
 
continuous
 
miner
 
equipment,
 
installed
 
programmable
 
logic
 
controller,
 
or
 
PLC,
 
controls
 
on
 
the
 
skip
 
hoist
 
system,
upgraded our
 
belt drives
 
for increased
 
horsepower, deployed
 
state-of-the-art Fletcher
 
roof bolters
 
on our continuous
 
miner
sections
 
and
 
switched
 
to
 
PLC
 
control
 
systems
 
and
 
variable
 
frequency
 
drive,
 
or
 
VFD,
 
starters
 
on
 
our
 
belt
 
drives.
 
As
 
of
December 31, 2022, the book value of Buchanan and its associated plant and equipment was $387.6 million.
We are not aware of any significant
 
encumbrances or defects in title
 
with respect to the Property.
 
Additionally, we believe we
have obtained
 
all requisite
 
mining and
 
discharge permits
 
to conduct
 
our operations
 
at Buchanan
 
and expect
 
to be
 
able to
obtain all
 
required permits
 
in the
 
future. The
 
Buchanan mine
 
complex holds
 
one state
 
permit, with
 
the associated
 
NPDES
permit.
 
Buchanan is subject to a federal black lung excise tax of $1.21 per ton for underground mining and a federal reclamation tax
of $0.13
 
per ton for
 
underground mining.
 
However, the
 
federal black lung
 
excise tax
 
applies only with
 
respect to coal
 
sold
domestically.
 
Additionally, Buchanan is subject to a Virginia reclamation tax of $0.05 per ton (which amount is contributed to
a state-funded bond pool) and a Virginia severance tax of 2% for all coal sold. See Item 1. “Business—Regulatory Matters—
United States” for a discussion of the permitting conditions applicable to Buchanan.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
85
Summaries of
 
Buchanan’s coal
 
resources and
 
reserves as
 
of December
 
31, 2022
 
and 2021
 
are shown in
 
Tables
 
6 and
 
7,
respectively.
Table
 
6.
 
Buchanan
 
–
 
Summary
 
of
 
Coal
 
Resources
 
Exclusive
 
of
 
Reserves
 
at
 
the
 
End
 
of
 
the
 
Fiscal
 
Year
 
Ended
December 31, 2022 and 2021.
(1)
Coal Resources (Dry Tons, In Situ, MMt)
(2)(3)
Quality (Air-Dried Basis)
Measured
Indicated
Measured
+
Indicated
Inferred
Ash
Sulfur
Volatile
Matter
December 31, 2022
34
6
40
—
25.0%
0.7%
16.0%
December 31, 2021
11
4
15
—
25.0%
0.7%
16.0%
(1)
 
Pricing for resources is described in
 
Section 11.3.1 of the Buchanan TRS.
 
Based on assumed long-term average price
 
of $94 per
Mt (FOB loadout) for
 
Buchanan resources as
 
of December 31, 2021
 
and $110 per Mt (FOB loadout)for
 
resources at December 31,
2022,
 
representing the long-term average price forecast
 
for Buchanan based on independent price forecasts.
(2)
 
Exclusive of reserve
 
tons.
 
Table
 
1-1 of the
 
Buchanan TRS provides
 
a summary of
 
Buchanan resource tons
 
inclusive of reserve
tons as of December 31, 2022.
(3)
 
Reported on a dry basis.
 
Surface moisture and inherent moisture are excluded.
(4)
 
Some numerical figures in the
 
above table have been subject
 
to rounding adjustments. Accordingly,
 
numerical figures shown as
totals may not equal the sum of the figures that
 
precede them.
Table
 
7.
 
Buchanan
 
–
 
Summary
 
of
 
Coal
 
Reserves
 
(Marketable
 
Sales
 
Basis)
 
at
 
the
 
End
 
of
 
the
 
Fiscal
 
Year
 
Ended
December 31, 2022 and 2021.
(1)
Demonstrated Coal Reserves (Wet
Tons, Washed
or Direct Shipped, MMt)
(2)
Quality (Air-Dried Basis)
Proven
Probable
Total
Ash
Sulfur
Volatile
Matter
December 31, 2022
88
5
93
6.0%
0.7%
19.0%
December 31, 2021
87
11
98
6.0%
0.7%
19.0%
(1)
 
Pricing data as provided
 
by Coronado is described
 
in Section 16.2 of
 
the Buchanan TRS.
 
For Buchanan reserves as
 
of December
31, 2021, the pricing data assumes a weighted average domestic and
 
international FOB-mine price of approximately $197 per Mt
for calendar
 
year 2022;
 
the weighted
 
average price
 
decreases to
 
approximately $118
 
to
 
$126
 
per Mt
 
through year
 
2026 and
averages approximately $152 per Mt over
 
the LOM.
 
For Buchanan reserves as of December
 
31, 2022, the pricing
 
data assumes
a weighted average
 
domestic and international
 
FOB-mine price of
 
approximately $179 per
 
Mt for calendar
 
year 2023; the weighted
average price decreases to approximately $132 to $143 per Mt through year 2027 and averages approximately $153 per Mt over
the LOM.
(2)
 
Reported on a 6.0% moisture basis.
(3)
 
Some numerical figures in the
 
above table have been subject
 
to rounding adjustments. Accordingly,
 
numerical figures shown as
totals may not equal the sum of the figures that
 
precede them.
From December
 
31, 2021
 
to December
 
31, 2022,
 
total reserves decreased
 
by approximately
 
5%, from approximately
 
98.0
MMt to approximately 93.0 MMt.
 
This net reduction of 5.0 MMt of total reserves was attributable
 
to a combination of updates
to the mine plan along with one year of mining depletion. A TRS with respect to Buchanan, updating the TRS with respect to
Buchanan
 
filed
 
with
 
Coronado’s
 
Annual
 
Report
 
on
 
Form
 
10-K
 
for
 
the
 
year
 
ended
 
December
 
31,
 
2021,
 
was
 
prepared
 
in
February
 
2023
 
due
 
to
 
material
 
differences
 
in
 
the
 
key
 
financial
 
modifying
 
factors,
 
including coal
 
sales
 
price
 
assumptions,
operating costs and capital costs from
 
December 31, 2021 to December 31,
 
2022. Coal sales price assumptions underlying
the reserve
 
estimates are
 
discussed in
 
Sections 12
 
and 16
 
of the
 
Buchanan TRS,
 
while operating
 
costs and
 
capital costs
assumptions underlying the reserve
 
estimates are discussed in
 
Sections 18 and 19
 
of the Buchanan TRS.
 
The differences
in the
 
key financial
 
modifying factors
 
did not
 
have a
 
material impact
 
on the
 
reserve estimates
 
from December
 
31, 2021
 
to
December
 
31,
 
2022.
 
From
 
December
 
31,
 
2021
 
to
 
December
 
31,
 
2022,
 
measured
 
and
 
indicated
 
resources
 
increased
significantly,
 
by approximately 167%,
 
due to
 
evaluation of
 
additional gas
 
well data in
 
the North where
 
none had
 
previously
been analyzed.
 
Updated financial
 
inputs, including
 
coal sales
 
price assumptions
 
and operating
 
and capital
 
costs used
 
in
estimating the resources exclusive of reserves, as discussed in
 
Section 11.3.1 of the Buchanan TRS, did not have a material
impact on
 
the measured
 
and indicated
 
resource estimates
 
as of
 
December 31,
 
2022, as
 
compared to
 
the measured
 
and
indicated resource estimates as of
 
December 31, 2021. Net increase resulted
 
in an additional 25 MMt of
 
in-place resources
in the North.
Marshall Miller & Associates, Inc., a third-party firm comprising mining experts,
 
whom we refer to as the U.S. QPs, prepared
the estimates of
 
coal resources and
 
reserves as of December
 
31, 2022 summarized
 
in Tables
 
6 and 7.
 
A copy of the
 
U.S.
QPs’ TRS
 
with respect to
 
Buchanan, dated
 
as of
 
February 15, 2023,
 
or the
 
Buchanan TRS,
 
is filed
 
as Exhibit 96.2
 
hereto.
The U.S. QPs are not affiliated with Coronado.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
86
The
 
U.S.
 
QPs
 
prepared
 
the
 
estimates
 
of
 
coal
 
resources
 
and
 
reserves
 
using
 
core
 
drilling
 
data
 
available
 
from
 
exploration
activities at
 
Buchanan conducted
 
by numerous
 
entities over
 
time.
 
Most of
 
this information
 
was obtained
 
prior to
 
our acquisition
of the
 
property,
 
using varying drilling
 
and core-logging
 
techniques, survey methods
 
and testing procedures.
 
As a result,
 
in
verifying the data,
 
the U.S. QPs
 
made certain assumptions
 
about the adequacy
 
of the processes
 
performed and comparability
of the data based on their professional experience and familiarity with Buchanan.
Per Section 12.1 of the Buchanan TRS, coal reserves were classified as proven or probable considering “modifying factors,”
including mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors.
 
Section 22.2 of
the Buchanan TRS includes
 
a risk assessment of the
 
key modifying factors that could
 
potentially impact the operations
 
and
therefore the estimate of coal reserves and resources.
As summarized
 
in Section
 
7.1 in
 
the Buchanan
 
TRS, the
 
U.S. QPs
 
utilized 4,589
 
available core,
 
rotary,
 
channel samples,
mine
 
measurements
 
and
 
coalbed
 
methane
 
wells
 
on
 
and
 
around
 
the
 
Buchanan
 
property.
 
Points
 
of
 
observation
 
include
exploration drill
 
holes, degas
 
holes, and
 
mine measurements,
 
which have
 
been fully
 
vetted and
 
processed into
 
a geologic
model.
 
The geologic model is based on seam depositional modeling, the interrelationship of
 
overlying and underlying strata
on seam mineability, seam thickness trends, the impact of seam structure (i.e., faulting), intra-seam characteristics, etc.
 
The
U.S. QPs completed a geostatistical analysis on drill holes within the reserve boundaries to determine the applicability of the
common United States classification system for
 
measured and indicated coal resources.
 
Historically,
 
the United States has
assumed that coal within 0.4
 
kilometers of a point of
 
observation represents a measured resource,
 
whereas coal between 0.4
kilometers and
 
1.2 kilometers
 
from a
 
point of
 
observation is
 
classified as
 
indicated.
 
Inferred resources
 
are commonly
 
assumed
to be located between 1.2
 
kilometers and 4.8 kilometers from
 
a point of observation. The
 
U.S. QPs performed a geostatistical
analysis of the Buchanan data set using
 
the Drill Hole Spacing Analysis, or DHSA,
 
method. DHSA prescribes that measured,
indicated
 
and
 
inferred
 
drill
 
hole
 
spacings
 
be
 
determined
 
at
 
the
 
10%,
 
20%,
 
and
 
50%
 
levels
 
of
 
relative
 
error,
 
respectively.
Comparing the results of
 
the DHSA to
 
the historical standards,
 
it is evident that
 
the historical standards
 
are more conservative
than
 
even
 
the
 
most
 
conservative
 
DHSA
 
model
 
with
 
regards to
 
determining
 
measured
 
resources.
 
The
 
Exponential
 
model
included in the DHSA
 
recommends using a radius
 
of 0.67 kilometers
 
for measured resources
 
compared to the historical
 
value
of
 
0.4
 
kilometers.
 
With
 
respect
 
to
 
indicated
 
resources
 
the
 
DHSA
 
falls
 
in
 
line
 
closely
 
with
 
the
 
historical
 
standards.
 
The
Exponential and Spherical models of the DHSA recommend using a radius of 1.08 kilometers from a point of observation for
indicated resources, while
 
the Gaussian model included
 
in the DHSA
 
recommends a radius
 
of 1.10 kilometers
 
from a point
of observation for indicated resources. These values line up closely with the historical radius of 1.2 kilometers. These results
have led
 
the U.S.
 
QPs to
 
report the
 
data following
 
the historical
 
classification standards,
 
rather than
 
use the
 
results of
 
the
DHSA.
Coal quality is instrumental
 
in determining the viability
 
of a coal deposit.
 
Per Section 8.2 of
 
the Buchanan TRS,
 
coal quality
conforms to the American Society
 
for Testing and Materials, or ASTM, standards. These quality
 
attributes aided in converting
dry, in-place tons to demonstrated coal reserves (recoverable washed tons).
 
The reserve and resource criteria are
 
presented
in
 
Table
 
11-1
 
of
 
the
 
Buchanan
 
TRS,
 
including
 
assumptions
 
related
 
to
 
seam
 
density,
 
minimum
 
cut-off
 
thickness,
 
and
recoveries.
 
Regarding production rates as described in
 
Section 13.2 of the Buchanan TRS,
 
the mine plan and productivity expectations
reflect historical performance and
 
efforts have been
 
made to adjust the
 
plan to reflect
 
future conditions.
 
Mine development
and operation have not been optimized within the Buchanan TRS.
Logan
Coronado’s Logan property is
 
currently in the production stage.
 
Logan consists of four
 
active underground mines (North
 
Fork
Winifrede,
 
Lower War
 
Eagle, Eagle
 
No. 1
 
and Muddy
 
Bridge) and
 
supporting infrastructure
 
that produce
 
High-Volatile
 
Met
coal using
 
the room
 
and pillar
 
mining method
 
and one
 
active surface
 
mine (Toney
 
Fork) and
 
supporting infrastructure
 
that
produce both Met and thermal coal using the contour and highwall mining methods. The
 
Logan complex life plan includes 12
proposed mines,
 
consisting of
 
nine underground
 
mines and
 
three surface
 
mines. The
 
property is
 
located in
 
Boone, Logan
and Wyoming Counties in southern West Virginia.
 
The surface facilities are located in Logan County,
 
West Virginia.
 
A map
of Logan is shown in Figure 5.
c561202210Kp87i0
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
87
Figure 5.
 
Coronado Logan Mine Complex Property Location Map.
The Logan mine complex
 
encompasses the towns of
 
Lorado and Pardee in
 
Logan County,
 
West Virginia, and
 
Cyclone and
Lacoma in Wyoming County, West
 
Virginia. The coordinates of the Saunders CPP are latitude 37° 47' 58" and longitude 81°
40'
 
01"
 
(Easting
 
1,806,880’,
 
Northing
 
291,517’
 
–
 
in
 
the
 
WV
 
State
 
Plane
 
South
 
NAD
 
27
 
grid
 
system).
 
The
 
nearest
 
major
population centers are
 
Huntington, West Virginia,
 
and Charleston, West
 
Virginia, which are
 
about 145 kilometers northwest
and 129
 
kilometers northeast
 
of the
 
property,
 
respectively.
 
From U.S.
 
Route 119,
 
which runs
 
through Mingo,
 
Logan and
Boone Counties to the north, a
 
well-developed network of improved and unimproved
 
roads provides access to the property,
including
 
Route
 
16
 
and
 
Route
 
10,
 
which
 
run
 
east-west
 
across
 
the
 
property
 
in
 
Logan
 
County
 
and
 
Wyoming
 
County,
respectively.
 
The Logan surface facilities
 
are located approximately 21
 
kilometers northeast of Man,
 
West Virginia, along a
CSX Corporation, or CSX, rail line,
 
which serves as the primary means
 
of transport for produced coal.
 
CSX transports coal
from Logan
 
either to
 
domestic customers
 
or to
 
the Kinder
 
Morgan Pier
 
IX and
 
Dominion Terminals
 
in Norfolk,
 
Virginia, for
overseas shipment.
Logan has
 
ready access to
 
water, electricity
 
and personnel to
 
support its operations.
 
Buffalo Creek
 
Public Service
 
District
supplies water
 
and American
 
Electric Power
 
supplies electricity
 
to the
 
mine complex.
 
Mine personnel
 
generally live
 
in the
surrounding communities of Logan, Boone, Wyoming and Mingo Counties in West Virginia.
 
The property mineral
 
rights are
 
composed of 13,183
 
total hectares, 13,114 of
 
which are leased
 
from private landholders
 
under
approximately 15
 
individual leases,
 
and 69
 
hectares are
 
owned by
 
Coronado.
 
Subject to
 
Coronado exercising
 
its renewal
rights thereunder, a majority of the leases, covering a majority of the Logan reserves, expire upon exhaustion of the relevant
coal
 
reserves,
 
which
 
is
 
expected
 
to
 
occur
 
in
 
2056.
 
One
 
lease expires
 
in
 
2032;
 
however,
 
Coronado
 
is
 
projected
 
to
 
have
previously exhausted the reserves covered thereby.
Under the
 
terms of
 
the leases,
 
we are
 
required to
 
pay royalties
 
ranging from
 
3.0% to
 
9.0% of
 
revenue from
 
sales of
 
coal
produced depending on mining
 
method. Certain of the
 
leases also provide for
 
“wheelage fees” ranging from
 
0.25% to 1.0%
of revenue from sales of coal mined
 
and removed from properties other than
 
the particular leasehold and hauled across the
leasehold premises.
The mining
 
of Logan
 
was commenced
 
in 1945
 
by Lorado
 
Mining Company,
 
or Lorado.
 
Lorado was
 
sold to
 
Buffalo Mining
Company in
 
1964 and
 
then to Pittston
 
Coal Company
 
in 1971.
 
Pittston operated
 
the property
 
until the
 
early 1990’s.
 
After
being idle for a period, the property was then sold to
 
Addington Resources in 2004.
 
Imagin Natural Resources acquired the
property in 2007 and sold
 
it to Cliffs Natural Resources Inc.
 
(now known as Cleveland-Cliffs Inc.) in 2011,
 
which in turn sold
the property to Coronado in 2014. Production history
 
has been approximately 1.6 MMt in 2020, 1.9
 
MMt in 2021 and 2.1 MMt
in 2022.
Before
 
Coronado
 
acquired
 
Logan,
 
previous
 
owners
 
had
 
conducted
 
extensive
 
exploration
 
on
 
the
 
property.
 
Coronado
 
has
continued exploration
 
at the
 
property through
 
a program
 
of core
 
drilling to
 
confirm reserves,
 
establish additional
 
resources
and assess the geotechnical viability of mining.
 
Logan
 
produces
 
primarily
 
High-Vol
 
Met
 
coal
 
(HVA
 
HCC
 
and
 
HVB
 
HCC),
 
mined
 
from
 
various
 
seams
 
of
 
the
 
Kanawha
Formation, most of which are situated below
 
drainage; however, several Met coal seams are situated above drainage.
 
Logan
also produces thermal coal from upper portions of the Kanawha Formation.
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
88
Most of Logan’s Met coal production is
 
attributable to its four active underground mines, Winifrede, Lower War
 
Eagle, Eagle
No. 1 and Muddy Bridge, each of which uses the room and
 
pillar mining method.
 
The North Fork Winifrede mine utilizes one
continuous miner
 
section to
 
extract coal
 
from the
 
Upper Winifrede
 
seam, which
 
is situated
 
above drainage
 
throughout the
property and accessed by drift entry.
 
The Lower War Eagle mine utilizes two continuous miner
 
super sections to extract coal
from the Lower War Eagle
 
seam, which is situated
 
below drainage throughout the
 
property and accessed
 
by slope. The Eagle
No. 1 mine utilizes
 
three continuous miner super
 
sections to extract coal
 
from the No. 2 Gas
 
seam, which is situated
 
above
drainage throughout the
 
property and accessed
 
by drift entry.
 
The Muddy Bridge
 
mine utilizes two
 
continuous miner super
sections to extract coal from the No. 2
 
Gas seam, which is situated above drainage
 
throughout the property and accessed by
drift entry.
A majority of the
 
sections of the active
 
underground mines at
 
Logan are configured as
 
full super sections, with
 
two continuous
miners
 
per
 
section.
 
Each
 
section
 
also
 
has
 
two
 
or
 
four
 
roof bolters,
 
three
 
or
 
six
 
shuttle
 
cars
 
and
 
two
 
scoops.
 
From
 
the
continuous miner at the production face, the shuttle cars haul extracted coal to
 
a feeder breaker, which transfers raw coal to
a conveyor belt for transport to a
 
surface stockpile holding area. A shared overland conveyor
 
carries raw coal from the Lower
War Eagle mine
 
to a CPP.
 
Trucks haul raw coal
 
from the Eagle No. 1 and
 
North Fork Winifrede mines to the
 
CPP and from
the Muddy Bridge mine to
 
the Logan overland conveyor.
 
The CPP has a feed
 
rate capacity of 1,088 raw
 
tph.
 
The CPP site
includes raw coal storage, clean coal storage, a loadout connected to a CSX rail line and refuse disposal area.
The Toney
 
Fork surface mine extracts Met and thermal coal using the area mining method. The current LOM plan for Toney
Fork also contemplates utilizing
 
contour and highwall mining
 
methods at various times
 
during the life of
 
the mine. The mine
uses a spread of front-end loaders, large tractors/dozers and rock trucks to remove overburden and
 
expose the coal. We will
deploy
 
highwall
 
mining
 
when
 
overburden
 
volumes
 
exceed
 
economical
 
stripping
 
ratios
 
associated
 
with
 
area
 
and
 
contour
mining. Trucks
 
haul raw
 
coal from
 
Toney
 
Fork to
 
the CPP
 
site for
 
cleaning or
 
to the
 
loading site
 
to be
 
shipped directly
 
to
customers.
Our current plans at Logan contemplate 12 proposed mines, consisting of nine underground mines and three surface mines,
including the five mines
 
currently in operation.
 
The proposed underground mines
 
would extract coal using
 
the room and pillar
mining method, and the proposed surface mines would
 
extract coal using area, contour or highwall
 
mining methods, or some
combination thereof.
Generally, the mining equipment and facilities at Logan are in good operating condition.
 
We focus on the long-term potential
of
 
the
 
mine
 
complex
 
and
 
regularly
 
monitor
 
developments
 
in
 
the
 
mining
 
industry
 
for
 
technology
 
improvements
 
and
 
new
equipment that could
 
help us increase
 
efficiency and lower
 
our costs. Logan’s
 
oldest mining equipment
 
and facilities, including
the CPP and
 
loadout facility,
 
began operations in
 
2008, when the Powellton
 
No. 1 mine started
 
production. Since acquiring
the Logan operations, we
 
have implemented improvements at
 
the CPP, which have resulted in increased
 
capacity. From time
to
 
time,
 
we
 
also
 
update
 
and
 
improve
 
other
 
equipment
 
and
 
facilities
 
to
 
maintain
 
their
 
usefulness
 
and
 
optimize
 
our
competitiveness. As
 
of December
 
31, 2022,
 
the book
 
value of
 
Logan and
 
its associated
 
plant and
 
equipment was
 
$232.1
million.
We are not aware of any significant encumbrances or
 
defects in title with respect to the property.
 
Additionally, we believe we
have obtained all requisite mining and discharge permits to conduct our operations at Logan and expect
 
to be able to obtain
or renew all required permits in the future. The Logan mine complex holds 24 state permits with associated NPDES permits.
 
Logan is subject to a federal black lung excise tax of $1.21 per ton for underground mining
 
and $0.28 per ton for surface and
highwall mining;
 
however,
 
this tax
 
applies only
 
with respect
 
to
 
coal sold
 
domestically.
 
Logan is
 
also subject
 
to a
 
federal
reclamation fee
 
of $0.13
 
per ton
 
for underground
 
mining and
 
$0.31 per
 
ton for
 
surface and
 
highwall mining.
 
Additionally,
Logan is subject to
 
a West Virginia
 
reclamation tax of $0.308 per
 
ton and a West
 
Virginia severance tax of
 
1.0% to 5.0% of
revenues for all coal produced.
 
See Item 1. “Business—Regulatory Matters—United States”
 
for a discussion of the
 
permitting
conditions applicable to Logan.
 
Summaries
 
of
 
Logan’s
 
coal
 
resources
 
and
 
reserves
 
as
 
of
 
December
 
31,
 
2022
 
and
 
2021
 
are
 
shown
 
in
 
Tables
 
8
 
and
 
9,
respectively.
Table 8.
 
Logan – Summary of Coal Resources Exclusive of Reserves at the End of the
 
Fiscal Year Ended December
31, 2022 and 2021.
(1)
Coal Resources (Dry Tons, In Situ, MMt)
(2)(3)
Quality (Air-Dried Basis)
Measured
Indicated
Measured
+
Indicated
Inferred
Ash
Sulfur
Volatile
Matter
December 31, 2022
45
37
82
3
24.0%
1.0%
28.0%
December 31, 2021
46
37
83
3
24.0%
1.0%
28.0%
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
89
(1)
 
Pricing for resources is described in Section 11.3.1 of the Logan TRS.
 
For Logan resources as of December 31, 2021, based on
assumed long-term average price of $130 per
 
ton (FOB loadout) for underground-mineable
 
resources, representing the long-term
average price
 
forecast for
 
HVB provided
 
by Coronado;
 
surface resources
 
were assessed
 
at a
 
sales price
 
of $52
 
per Mt
 
(FOB
loadout) based on estimated historical
 
pricing for Coronado’s surface operations.
 
For Logan resources as of December
 
31, 2022,
based on assumed long-term average price of $154 per Mt (FOB loadout) for underground-mineable resources, representing the
long-term average price forecast for HVB provided by Coronado; surface resources were assessed at a sales price of $83 per Mt
(FOB loadout) based on estimated historical pricing
 
for Coronado’s surface operations.
(2)
 
Exclusive of reserve tons.
 
Table 1-1 of the Logan TRS provides a summary of Logan
 
resource tons inclusive of reserve tons
 
as of
December 31, 2022.
(3)
 
Reported on a dry basis.
 
Surface moisture and inherent moisture are excluded.
(4)
 
Some numerical figures in the
 
above table have been subject
 
to rounding adjustments. Accordingly,
 
numerical figures shown as
totals may not equal the sum of the figures that
 
precede them.
Table 9.
 
Logan – Summary of
 
Coal Reserves (Marketable Sales
 
Basis) at the End
 
of the Fiscal Year Ended December
31, 2022 and 2021.
(1)
Demonstrated Coal Reserves (Wet
Tons,
Washed or Direct Shipped, MMt)
(2)
Quality (Air-Dried Basis)
Proven
Probable
Total
Ash
Sulfur
Volatile
Matter
December 31, 2022
53
17
71
8.0%
0.9%
36.0%
December 31, 2021
53
20
74
8.0%
0.9%
35.0%
(1)
 
Pricing data as
 
provided by Coronado is
 
described in Section
 
16.2 of the
 
Logan TRS.
 
For Logan reserves
 
as of December
 
31,
2021, the
 
pricing data
 
assumes respective
 
HVA,
 
HVB, specialty
 
markets and
 
thermal FOB-mine
 
prices of
 
approximately $224,
$123, and $51 per Mt for calendar year 2022; HVA, HVB, and thermal prices decrease to approximately $145, $115, and $51 per
Mt, respectively, through year 2026,
 
and then increase
 
to $227, $189, and
 
$51 per Mt,
 
respectively, through year 2050 (after
 
which
sales prices were held constant). For
 
Logan reserves as of December 31,
 
2022, the pricing data assumes
 
respective HVA, HVB
and thermal FOB-mine
 
prices of approximately
 
$192, $170, and
 
$227 per Mt
 
for calendar
 
year 2023; HVA, HVB,
 
and thermal prices
decrease to approximately
 
$151, $132, and
 
$83 per Mt,
 
respectively, through
 
year 2027, and
 
then increase to
 
$271, $237, and
$150 per Mt, respectively, through year 2056.
(2)
 
Reported on a 4.5% - 6.0% moisture basis.
(3)
 
Some numerical figures in the
 
above table have been subject
 
to rounding adjustments. Accordingly,
 
numerical figures shown as
totals may not equal the sum of the figures that
 
precede them.
From December 31, 2021 to December 31, 2022, total reserves decreased by approximately 3.9%, from approximately 73.5
MMt to 70.6
 
MMt.
 
This net reduction
 
of 2.9 MMt
 
of total reserves
 
was attributable to
 
a combination of
 
updates to the
 
mine
plans along
 
with one year
 
of mining
 
depletion. A
 
TRS with
 
respect to
 
Logan, updating
 
the TRS
 
with respect
 
to Logan
 
filed
with Coronado’s Annual
 
Report on Form
 
10-K for the
 
year ended December
 
31, 2021, was
 
prepared in February
 
2023 due
to
 
material
 
differences
 
in
 
the
 
key
 
financial
 
modifying
 
factors
 
including
 
coal
 
sales
 
price
 
assumptions,
 
operating
 
costs
 
and
capital costs from
 
December 31, 2021,
 
to December 31,
 
2022. Coal sales
 
price assumptions underlying
 
the reserve estimates
are discussed in Sections
 
12 and 16 of the
 
Logan TRS, while operating
 
costs and capital costs
 
assumptions underlying the
reserve estimates
 
are discussed
 
in Sections
 
18 and
 
19 of
 
the Logan
 
TRS.
 
The differences
 
in the
 
key financial
 
modifying
factors
 
did
 
not
 
have
 
a
 
material
 
impact
 
on
 
the
 
reserve
 
estimates
 
as
 
of
 
December
 
31,
 
2022,
 
as
 
compared
 
to
 
the
 
reserve
estimates as of
 
December 31, 2021.
 
From December 31,
 
2021, to December
 
31, 2022, measured
 
and indicated resources
decreased by approximately 0.7%,
 
from approximately 82.8 MMt
 
to 82.2 MMt. This
 
net reduction of 0.6
 
MMt of measured
 
and
mineral resources
 
was attributable
 
to one
 
year of
 
mining depletion
 
along with
 
changes to the
 
mine plan.
 
Updated financial
inputs, including coal sales price assumptions and
 
operating and capital costs used in estimating
 
the resources exclusive of
reserves, as discussed
 
in Section 11.3.1
 
of the Logan
 
TRS, did not
 
have a material
 
impact on the
 
measured and indicated
resource
 
estimates
 
as
 
of
 
December
 
31,
 
2022,
 
as
 
compared
 
to
 
the
 
measured
 
and
 
indicated
 
resource
 
estimates
 
as
 
of
December 31, 2021.
Marshall Miller & Associates, Inc., a third-party firm comprising mining experts,
 
whom we refer to as the U.S. QPs, prepared
the estimates of
 
coal resources
 
and reserves as of
 
December 31, 2022 summarized
 
in Tables
 
8 and 9.
 
A copy of the
 
U.S.
QPs’ TRS with respect to Logan, dated as
 
of February 15, 2023, or the Logan TRS,
 
is filed as Exhibit 96.3 hereto. The
 
U.S.
QPs are not affiliated with Coronado.
The
 
U.S.
 
QPs
 
prepared
 
the
 
estimates
 
of
 
coal
 
resources
 
and
 
reserves
 
using
 
core
 
drilling
 
data
 
available
 
from
 
exploration
activities at Logan conducted
 
by numerous entities over
 
time.
 
Most of this information
 
was obtained prior to
 
our acquisition
of the
 
property,
 
using varying drilling
 
and core-logging
 
techniques, survey methods
 
and testing procedures.
 
As a result,
 
in
verifying the data,
 
the U.S. QPs
 
made certain assumptions
 
about the adequacy
 
of the processes
 
performed and comparability
of
 
the
 
data
 
based
 
on
 
their
 
professional
 
experience
 
and
 
familiarity
 
with
 
Logan.
 
Per
 
Section
 
12.1
 
of
 
the
 
Logan
 
TRS,
 
coal
reserves were
 
classified as
 
proven or
 
probable considering
 
“modifying factors,”
 
including mining,
 
metallurgical, economic,
marketing, legal, environmental, social
 
and governmental factors.
 
Section 22.2 of the
 
Logan TRS includes a
 
risk assessment
of
 
the
 
key
 
modifying
 
factors
 
that
 
could
 
potentially
 
impact the
 
operations
 
and
 
therefore
 
the
 
estimate
 
of
 
coal
 
reserves
 
and
resources.
c561202210Kp90i0
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
90
As summarized in
 
Section 7.1 in the
 
Logan TRS, the U.S.
 
QPs utilized 1,131 available
 
core, rotary,
 
and gas well drilling
 
on
and around the Logan property.
 
Points of observation include exploration drill holes,
 
degas holes, and mine measurements,
which
 
have
 
been
 
fully
 
vetted
 
and
 
processed
 
into
 
a
 
geologic
 
model.
 
The
 
geologic
 
model
 
is
 
based
 
on
 
seam
 
depositional
modeling, the interrelationship
 
of overlying and underlying
 
strata on seam mineability,
 
seam thickness trends,
 
the impact of
seam structure (i.e., faulting), intra-seam characteristics, etc.
 
The U.S. QPs completed a geostatistical analysis on
 
drill holes
within the reserve boundaries to determine the applicability of the common United States classification system for measured
and
 
indicated
 
coal
 
resources.
 
Historically,
 
the
 
United
 
States
 
has
 
assumed
 
that
 
coal
 
within
 
0.4
 
kilometers
 
of
 
a
 
point
 
of
observation
 
represents
 
a
 
measured
 
resource
 
whereas
 
coal
 
between
 
0.4
 
kilometers
 
and
 
1.2
 
kilometers
 
from
 
a
 
point
 
of
observation is classified as indicated.
 
Inferred resources are commonly assumed to be located
 
between 1.2 kilometers and
4.8 kilometers from a point of observation. The U.S. QPs performed a geostatistical analysis of the Logan data set using the
DHSA method. DHSA prescribes measured, indicated, and
 
inferred drill hole spacings be determined at
 
the 10%, 20%, and
50% levels of relative error, respectively.
 
Comparing the results of the DHSA to the historical standards, it is evident that the
historical
 
standards
 
are
 
more
 
conservative
 
than
 
even
 
the
 
most
 
conservative
 
DHSA
 
model
 
with
 
regards
 
to
 
determining
measured
 
resources. The
 
Exponential and
 
Spherical models
 
recommend using
 
a
 
radius of
 
0.87 kilometers
 
for measured
resources
 
compared
 
to
 
the
 
historical
 
value
 
of
 
0.4
 
kilometers.
 
With
 
respect
 
to
 
indicated
 
resources
 
the
 
Spherical
 
and
Exponential models recommend using a radius
 
1.53 kilometers.
 
The historical radius of 1.2
 
kilometers is therefore also more
conservative than the DHSA results for
 
indicated resources.
 
These results have led the U.S.
 
QPs to report the data following
the historical classification standards, rather than use the results of the DHSA.
Coal
 
quality
 
is
 
instrumental
 
in
 
determining
 
the
 
viability
 
of
 
a
 
coal
 
deposit.
 
Per
 
Section
 
8.2 of
 
the
 
Logan
 
TRS,
 
coal
 
quality
conforms
 
to
 
the
 
ASTM
 
standards.
 
These
 
quality
 
attributes
 
aided
 
in
 
converting
 
dry,
 
in-place
 
tons
 
to
 
demonstrated
 
coal
reserves
 
(recoverable
 
washed
 
tons).
 
The
 
reserve
 
and
 
resource
 
criteria
 
are
 
presented
 
in
 
Table
 
11-1
 
of
 
the
 
Logan
 
TRS,
including
 
assumptions
 
related
 
to
 
seam
 
density,
 
minimum
 
cutoff
 
thickness,
 
and
 
recoveries.
 
Pricing
 
data
 
as
 
provided
 
by
Coronado is described in Section 16.2 of the Logan TRS.
 
Regarding production
 
rates as
 
described in
 
Section 13.2
 
of the
 
Logan TRS,
 
the projected
 
underground mines
 
are set
 
up
similarly to the four
 
active underground operations as
 
of December 31, 2022.
 
Each mine is scheduled
 
to operate one to
 
three
production sections.
 
A majority of the sections are configured as full super sections with two continuous miners
 
per section.
 
Three
 
surface resource
 
areas were
 
modeled.
 
Mining
 
operations are
 
projected to
 
utilize area,
 
as well
 
as contour,
 
mining
methods.
 
The three areas
 
planned for highwall
 
mining are assumed
 
to be mined
 
by a contractor;
 
therefore, the contractor
costs
 
included
 
in
 
the
 
financial
 
model
 
assume
 
that
 
the
 
contractor
 
is
 
responsible
 
for
 
staffing
 
those
 
operations
 
along
 
with
providing necessary equipment
 
capital. Spoil for
 
final highwall reclamation is
 
expected to come
 
from strategic placement of
spoil on pre-existing benches by haul trucks such that they are within the push distance of the reclamation dozer.
 
Additional
information regarding mine-specific production factors can be found in Section 13.4 of the Logan TRS.
Mon Valley
The
 
Mon
 
Valley
 
mine
 
complex
 
comprises
 
three
 
development-stage
 
mining
 
properties,
 
namely,
 
Pangburn,
 
Shaner
 
and
Fallowfield, each consisting of a proposed underground
 
mine that would produce High-Vol Met coal using the room and pillar
mining method.
 
The preliminary design for the properties also includes plans for surface facilities and a preparation plant
 
for
each mine.
 
The properties reside
 
in Allegheny, Washington and Westmoreland Counties in
 
southwestern Pennsylvania.
 
The
proposed
 
facilities
 
include
 
a
 
barge
 
loading
 
dock
 
and
 
CSX
 
rail
 
loadout
 
on
 
the
 
Monongahela
 
River
 
in
 
Allegheny
 
County,
Pennsylvania, which would ship
 
clean coal from all three
 
mines to end customers.
 
A map of Mon Valley
 
is shown in Figure
6.
Figure 6.
 
Coronado Mon Valley Mine Complex Property Location Map.
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
91
Mon
 
Valley
 
is
 
located
 
approximately
 
22.5
 
kilometers
 
southeast
 
of
 
Pittsburgh,
 
Pennsylvania,
 
near
 
the
 
communities
 
of
Bentleyville,
 
Lockview,
 
Monongahela,
 
Elizabeth,
 
Sutersville
 
and
 
Irwin,
 
Pennsylvania.
 
The
 
coordinates
 
of
 
the
 
proposed
infrastructure are latitude 40°
 
15' 24" and longitude
 
79° 53' 50"
 
(Easting 1,398,821’, Northing 343,480’
 
– in the
 
PA State Plane
South NAD 27
 
grid system). From
 
U.S. Interstate
 
70 and Pennsylvania
 
Route 51, which
 
traverse the
 
Fallowfield and Pangburn
areas, respectively, a well-developed network of improved and
 
unimproved roads allows general access
 
to the property.
 
The
Monongahela and
 
Youghiogheny
 
Rivers also
 
run through
 
the property.
 
The primary
 
means of
 
transport for
 
produced coal
would be by barge on the Monongahela River/Ohio River
 
system.
 
Additionally, a CSX rail line located along the banks of the
Monongahela River would provide another option for the shipment of coal.
Mon Valley has sources of water, power,
 
and supplies readily available for use.
 
Personnel in the area have historically been
sourced from the
 
surrounding communities in
 
Allegheny,
 
Washington, and
 
Westmoreland Counties, and
 
have proven to
 
be
adequate in numbers to
 
operate the mines.
 
As mining is
 
common in the surrounding
 
areas, the workforce
 
is generally familiar
with mining practices, and many are
 
experienced miners.
 
Water is expected to be sourced locally from
 
a nearby public water
sources
 
or
 
rivers.
 
Electricity
 
is
 
anticipated
 
to
 
be
 
sourced
 
from
 
West
 
Penn
 
Power.
 
The
 
service
 
industry
 
in
 
the
 
areas
surrounding the proposed mine complex has historically provided supplies, equipment repairs and fabrication, etc.
The property mineral rights are composed of 41,615
 
total hectares, of which 1,339 are leased from
 
private landholders under
two leases, and
 
40,276 hectares are
 
owned by Coronado.
 
Subject to
 
Coronado’s exercising its
 
renewal rights thereunder,
both of the leases expire upon exhaustion of the relevant coal reserves, which is expected to occur in 2100.
 
A predecessor of CONSOL
 
Energy previously controlled the
 
properties.
 
We acquired the properties
 
from CONSOL Energy
in March 2016 in connection with the acquisition of the Buchanan property.
Before we acquired Mon
 
Valley,
 
CONSOL Energy had conducted
 
extensive exploration of Mon
 
Valley.
 
We have continued
an exploration program focused on defining reserves and assessing the geotechnical viability of mining.
 
Mon Valley
 
is capable
 
of producing
 
primarily a
 
High-Vol
 
Met coal
 
from the
 
Upper Freeport
 
seam of
 
the Pennsylvania-age
Allegheny Formation.
 
The seam
 
is situated
 
below drainage
 
throughout the
 
properties and
 
would be
 
accessed with
 
slopes
and shafts.
 
The seam thickness in the projected mining areas averages 1.95 meters.
 
Under our current
 
mine development plans,
 
production would begin
 
at the Pangburn
 
mine in 2032,
 
followed by the
 
Shaner
mine in 2038
 
and, finally,
 
the Fallowfield mine
 
in 2057.
 
The proposed Mon
 
Valley
 
underground mines would
 
use the room
and pillar
 
mining method
 
with limited
 
pillaring as
 
to cause
 
no subsidence.
 
Each mine
 
would have
 
three continuous
 
miner
sections, with two continuous miners, two roof bolters,
 
four shuttle cars and two scoops per section.
 
The shuttle cars would
haul extracted coal
 
from the production
 
face to a
 
feeder breaker-conveyor system,
 
which would carry
 
raw coal to
 
a surface
stockpile and CPP.
 
The CPPs and surface facilities would have large raw
 
and clean coal storage areas to facilitate efficient
loading of clean coal into
 
barges or rail cars for
 
transport.
 
We have not yet
 
completed detailed designs of the
 
infrastructure
or surface facilities for the proposed Shaner and Fallowfield mines.
As of December 31, 2022, the book value of Mon Valley was $17.4 million.
We
 
are not
 
aware
 
of
 
any significant
 
encumbrances or
 
defects
 
in
 
title
 
with
 
respect to
 
the properties.
 
However,
 
we will
 
be
required
 
to obtain
 
alternate zoning
 
approval
 
from the
 
local township.
 
Further,
 
we will
 
be required
 
to submit
 
formal permit
applications to state or federal regulatory agencies.
 
Although we have commenced the work to
 
obtain the necessary permits
and
 
zoning
 
variances,
 
we
 
are
 
aware
 
that
 
the
 
period
 
of
 
time
 
necessary
 
to
 
obtain
 
final
 
authorizations,
 
for
 
purposes
 
of
commencing the development, construction and ultimate production at the proposed mine site, may be significant, and there
can be
 
no assurance
 
that we
 
can obtain
 
the necessary
 
zoning and
 
permits. See
 
Item 1.
 
“Business—Regulatory Matters—
United States” for a discussion of the permitting conditions applicable to Mon Valley.
 
Coal
 
mined
 
from
 
the
 
Mon
 
Valley
 
mine
 
complex
 
would
 
be
 
subject
 
to
 
a
 
federal
 
black
 
lung
 
excise
 
tax
 
of
 
$1.21
 
per
 
ton
 
for
underground mining and a federal reclamation tax of $0.13 per ton for underground mining.
 
However, the federal black lung
excise tax will only apply with respect to coal sold domestically.
Mon Valley contains no resources exclusive of reserve tons as of December 31, 2022 and 2021. Table 1-1 of the Mon Valley
TRS provides a summary of Mon Valley resource tons inclusive of reserve tons as of December 31, 2022.
A summary of Mon Valley’s coal reserves as of December 31, 2022 and 2021 is shown in Table
 
10.
Table
 
10.
 
Mon Valley
 
– Summary
 
of Coal
 
Reserves (Marketable
 
Sales Basis)
 
at the
 
End of
 
the Fiscal
 
Year
 
Ended
December 31, 2022 and 2021.
(1)
Demonstrated Coal Reserves (Wet
Tons, Washed
or Direct Shipped, MMt)
(2)
Quality (Air-Dried Basis)
Proven
Probable
Total
Ash
Sulfur
Volatile
Matter
December 31, 2022
78
57
134
8.0%
1.2%
35.0%
December 31, 2021
78
57
134
8.0%
1.2%
35.0%
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
92
(1)
 
Pricing data
 
as provided
 
by Coronado
 
is described
 
in Section
 
16.2 of
 
the Mon
 
Valley TRS.
 
For Mon
 
Valley reserves as
 
of December
31,
 
2021,
 
the
 
pricing
 
data
 
assumes
 
HVB
 
domestic
 
and
 
export
 
FOB-mine
 
prices
 
of
 
approximately
 
$137
 
and
 
$120
 
per
 
Mt,
respectively,
 
for
 
calendar
 
year
 
2027;
 
HVB
 
domestic
 
and
 
export
 
prices
 
increase
 
to
 
approximately
 
$221
 
and
 
$193
 
per
 
Mt,
respectively, through year 2050, and
 
then increased by 1% annual inflation thereafter.
 
For Mon Valley reserves as
 
of December
31,
 
2022,
 
the
 
pricing
 
data
 
assumes
 
HVB
 
domestic
 
and
 
export
 
FOB-mine
 
prices
 
of
 
approximately
 
$130
 
and
 
$114
 
per
 
Mt,
respectively,
 
for
 
calendar
 
year
 
2028;
 
HVB
 
domestic
 
and
 
export
 
prices
 
increase
 
to
 
approximately
 
$204
 
and
 
$178
 
per
 
Mt,
respectively, through year 2050, and then increased by 2% annual inflation
 
thereafter.
(2)
 
Reported on a 6.0% moisture basis.
(3)
 
Some numerical figures in the
 
above table have been subject
 
to rounding adjustments. Accordingly,
 
numerical figures shown as
totals may not equal the sum of the figures that
 
precede them.
Total
 
reserves did not change from December 31, 2021, to December 31, 2022. A TRS with respect to Mon Valley,
 
updating
the TRS
 
with respect
 
to Mon
 
Valley
 
filed with
 
Coronado’s Annual
 
Report on
 
Form 10-K
 
for the
 
year ended
 
December 31,
2021, was prepared
 
in February 2023
 
due to material
 
differences in
 
the key financial
 
modifying factors including
 
coal sales
price
 
assumptions,
 
operating
 
costs
 
and
 
capital
 
costs
 
from
 
December
 
31,
 
2021,
 
to
 
December
 
31,
 
2022.
 
Coal
 
sales
 
price
assumptions
 
are
 
discussed
 
in
 
Sections
 
12
 
and
 
16
 
of
 
the
 
Mon
 
Valley
 
TRS,
 
while
 
operating
 
costs
 
and
 
capital
 
costs
 
are
discussed in Sections 18 and 19 of the Mon Valley TRS.
Marshall
 
Miller
 
& Associates,
 
Inc.,
 
a
 
third-party
 
firm comprising
 
mining,
 
whom we
 
refer to
 
as
 
the U.S.
 
QPs, prepared
 
the
estimates of coal reserves summarized in Tables 10.
 
A copy of the U.S. QPs’ TRS
 
with respect to Mon Valley (Pennsylvania
Upper Freeport
 
Holdings), dated as
 
of February 15,
 
2023, or the
 
Mon Valley
 
TRS, is filed
 
as Exhibit
 
96.4 hereto. The
 
U.S.
QPs are not affiliated with Coronado.
The
 
U.S.
 
QPs
 
prepared
 
the
 
estimates
 
of
 
coal
 
resources
 
and
 
reserves
 
using
 
core
 
drilling
 
data
 
available
 
from
 
exploration
activities
 
at
 
Mon
 
Valley
 
conducted
 
by
 
numerous
 
entities
 
over
 
time.
 
Most
 
of
 
this
 
information
 
was
 
obtained
 
prior
 
to
 
our
acquisition of the Property, using varying drilling and core-logging techniques, survey methods and testing procedures.
 
As a
result, in
 
verifying the
 
data, the
 
U.S. QPs
 
made certain
 
assumptions about
 
the adequacy
 
of the
 
processes performed
 
and
comparability of the data based on their professional experience and familiarity with Mon Valley.
 
Per Section 12.1 of the Mon
 
Valley TRS, coal reserves were classified as proven or
 
probable considering “modifying factors,”
including mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors.
 
Section 22.2 of
the Mon Valley TRS includes a risk assessment of the key modifying factors that could potentially
 
impact the operations and
therefore the estimate of coal reserves and resources.
As summarized in Section
 
7.1 in the
 
Mon Valley TRS, the U.S.
 
QPs utilized approximately
 
750 available core and
 
rotary holes
on
 
and
 
around
 
the
 
Mon
 
Valley
 
properties.
 
Points
 
of
 
observation
 
include
 
exploration
 
drill
 
holes,
 
degas
 
holes,
 
and
 
mine
measurements, which have
 
been fully vetted
 
and processed into
 
a geologic model.
 
The geologic model
 
is based on
 
seam
depositional modeling,
 
the interrelationship
 
of overlying
 
and underlying
 
strata on
 
seam mineability,
 
seam thickness
 
trends,
the impact of seam structure (i.e. faulting), intra-seam characteristics, etc.
 
The U.S. QPs completed a geostatistical analysis
on drill holes within the
 
reserve boundaries to determine the applicability of
 
the common United States classification system
for measured and indicated coal
 
resources.
 
Historically, the United
 
States has assumed that coal
 
within 0.4 kilometers of a
point of observation represents a measured resource whereas coal between 0.4 kilometer and 1.2 kilometers from a point of
observation is classified as indicated.
 
Inferred resources are commonly assumed to be located
 
between 1.2 kilometers and
4.8 kilometers
 
from a
 
point of
 
observation. The
 
U.S. QPs
 
performed a
 
geostatistical analysis
 
of the
 
Pennsylvania data
 
set
using the
 
DHSA method.
 
DHSA prescribes
 
measured, indicated,
 
and inferred
 
drill hole
 
spacings be
 
determined at
 
the 10-
percent, 20-percent, and 50-percent levels of relative error, respectively.
 
Comparing the results of the DHSA to the historical
standards, it is evident
 
that the historical standards
 
are more conservative than
 
even the most
 
conservative DHSA model with
regards
 
to
 
determining
 
measured
 
resources.
 
The
 
Gaussian
 
and
 
Spherical
 
models
 
recommend
 
using
 
a
 
radius
 
of
 
0.72
kilometers for
 
measured resources
 
compared to the
 
historical value of
 
0.4 kilometers.
 
With respect
 
to indicated
 
resources
the
 
DHSA
 
falls
 
in
 
line
 
closely
 
with
 
the
 
historical
 
standards.
 
The
 
Exponential
 
model
 
recommends
 
using
 
a
 
radius
 
1.43
kilometers, while
 
the Spherical
 
and Gaussian
 
models recommend
 
a radius
 
of 1.42
 
kilometers, respectively.
 
These values
line up closely
 
with the historical
 
radius of 1.2
 
kilometers.
 
These results have
 
led the U.S.
 
QPs to report
 
the data following
the historical classification standards, rather than use the results of the DHSA.
Coal quality is instrumental in determining the viability of
 
a coal deposit. Per Section 8.2 of the Mon
 
Valley TRS, coal quality
conforms to the
 
ASTM standards.
 
These quality
 
attributes aided
 
in converting dry, in-place
 
tons to
 
demonstrated coal reserves
(recoverable washed tons). The reserve
 
and resource criteria are presented
 
in Table
 
11-1 of the
 
Mon Valley
 
TRS, including
assumptions related
 
to seam
 
density,
 
minimum cutoff
 
thickness, and
 
recoveries. Pricing
 
data as
 
provided by
 
Coronado is
described in Section 16.2 of the Mon Valley TRS.
 
Regarding production
 
rates as
 
described in
 
Section 13.2
 
of the
 
Mon Valley
 
TRS, the
 
Mon Valley
 
mine complex
 
is not
 
yet
active, with
 
three distinct
 
mines and
 
CPPs planned.
 
The mine
 
plan and
 
productivity expectations
 
reflect historical
 
performance
from other
 
similar mines
 
with similar
 
conditions and
 
efforts have
 
been made
 
to adjust
 
the plan
 
to reflect
 
future conditions.
Mine development and
 
operation have not been
 
optimized within the Mon
 
Valley
 
TRS.
 
Additional mine-specific factors can
be found in Section 13.4 of the Mon Valley TRS.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
93
Greenbrier (Non-Material Property)
The Greenbrier property has been idled
 
since April 1, 2020. During the
 
fourth quarter of 2020, the
 
Company committed to a
plan
 
to
 
sell
 
Greenbrier
 
on
 
the basis
 
that
 
it
 
does
 
not
 
form
 
part
 
of
 
the
 
Company’s
 
core
 
business
 
strategy.
 
The
 
Greenbrier
property is not
 
considered material to
 
Coronado’s business or
 
financial conditions. Resources
 
exclusive of reserves
 
are based
on assumed long-term average price of $154
 
per Mt (FOB loadout) for all resources,
 
representing the Company’s long-term
average
 
price
 
forecast
 
for
 
Greenbrier.
 
The
 
pricing
 
data
 
assumes
 
respective
 
Mid-Vol/Low-Vol
 
and
 
thermal/PCI
 
FOB-mine
prices of
 
approximately $152 and
 
$80 per Mt
 
for calendar year
 
2028.
 
Mid-Vol/Low-Vol
 
and thermal/PCI prices
 
increase to
approximately $206 and
 
$109 per Mt,
 
respectively, through
 
year 2043.
 
The Greenbrier operations
 
are projected to
 
be fully
depleted in
 
2043. Marketable
 
reserve tons
 
are reported
 
on a
 
moist basis,
 
including a
 
combination of
 
surface and
 
inherent
moisture.
 
The combination of surface and inherent moisture is modeled at 6.0%.
Russell County (Non-Material Property)
The Russell County property is not considered material
 
to Coronado’s business or financial conditions. In addition, pursuant
to the current mine plan,
 
the property will only
 
start generating cash flows when
 
it commences production in 2040.
 
Resources
exclusive
 
of
 
reserves
 
are
 
based
 
on
 
assumed
 
long-term
 
average
 
price
 
of
 
$143
 
per
 
Mt
 
(FOB
 
loadout),
 
representing
 
the
Company’s
 
long-term average
 
price
 
forecast for
 
Russell County.
 
The pricing
 
data assumes
 
HVA
 
FOB-mine prices
 
with a
weighted LOM
 
average of
 
approximately $228
 
per Mt.
 
Marketable reserve
 
tons are
 
reported on
 
a moist
 
basis, including
 
a
combination of surface and inherent moisture.
 
The combination of surface and inherent moisture is modeled at 6.0%.
Internal Controls
Our
 
staff
 
of
 
geologists
 
and
 
engineers
 
worked
 
with
 
the
 
qualified
 
persons
 
throughout
 
the
 
mineral
 
resource
 
and
 
reserve
estimation process and
 
provided data from
 
our own exploration
 
and operating activities
 
at the properties.
 
We have
 
internal
control procedures, including
 
quality assurance/quality
 
control procedures and
 
internal verification of
 
input data and
 
geological
modelling, subject to multi-level review,
 
to help ensure the validity of the data.
 
These procedures include, but are not limited
to:
•
 
Oversight and approval of each annual statement by responsible senior officers;
•
 
Independent, external review of new and materially changed estimates at regular intervals;
•
 
Annual reconciliation with internal planning
 
by our staff of geologists and
 
engineers to validate coal reserve
 
and coal
resource estimates for operating mines, including the following procedures:
•
 
Assessments
 
of
 
drilling,
 
sampling
 
and
 
quality
 
assurance/quality
 
control
 
data,
 
resource
 
modelling,
resource estimation, classification, and reporting;
•
 
Assessment
 
and
 
benchmarking
 
of
 
production
 
assumptions,
 
mining
 
rate
 
and
 
production
 
schedules
against historical production data;
•
 
Assessments of capital and operating costs against other comparable projects for reasonableness;
•
 
Continual identification and evaluation
 
of material technical
 
issues likely to impact
 
the five-year plan and
the future performance of producing properties;
•
 
An examination of historical information and results in respect of the technical aspects of
 
the properties by our staff
of geologists and engineers, including a review of the following key elements:
 
•
 
Geology mapping, reports and models, including geotechnical and hydrology aspects;
•
 
Coal resource and coal reserve estimates;
•
 
Mining operations and proposed growth options;
•
 
Coal preparation facilities;
•
 
Coal handling and transport;
•
 
Environmental matters and approvals;
•
 
Land management, including leases and other pertinent agreements;
•
 
Veracity of existing information supporting five-year plans and business plans;
•
 
Identification of key project drivers; and
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
94
•
 
Risks and opportunities.
The pricing information used
 
for preliminary resource valuation
 
and to estimate our
 
proven and probable coal
 
reserves was
based on
 
prices under
 
our existing
 
contracts and
 
price forecasts.
 
Below is
 
a description
 
of some
 
of the
 
factors that
 
could
affect price forecasts
 
for Met
 
and thermal
 
coal products
 
on a
 
mine-by-mine and
 
product-by-product basis.
 
Differences between
the assumptions and analyses included
 
in the price forecasts
 
and realized factors could cause
 
actual pricing to differ from
 
the
forecasts.
Metallurgical.
 
Several
 
factors
 
can
 
influence
 
Met
 
coal
 
supply
 
and
 
demand
 
and
 
pricing.
 
Demand
 
is
 
impacted
 
by
 
economic
conditions and demand for steel
 
and is also impacted by competing
 
technologies used to make steel, some
 
of which do not
use coal as a
 
manufacturing input. Competition
 
from other types
 
of coal is
 
also a key price
 
consideration and can be
 
impacted
by coal quality and characteristics, delivered
 
energy cost (including transportation costs), customer service
 
and support and
reliability of supply.
Seaborne Met
 
coal import
 
demand can
 
be significantly
 
impacted by
 
the availability
 
of local
 
coal production,
 
particularly in
leading Met coal
 
import countries such
 
as China and
 
India, among others,
 
as well as
 
country-specific policies
 
restricting or
promoting
 
domestic supply.
 
The competitiveness
 
of seaborne
 
Met coal
 
supply
 
from
 
leading Met
 
coal
 
exporting countries,
such as Australia, the United States, Russia, Canada and Mongolia, among others, is also an important price consideration.
In
 
addition
 
to
 
the
 
factors
 
noted
 
above,
 
the
 
prices
 
which
 
may
 
be
 
obtained
 
at
 
each
 
individual
 
mine
 
or
 
future
 
mine
 
can
 
be
impacted by factors such as (i) the
 
mine’s location, which impacts the total delivered
 
energy costs to its customers, (ii)
 
quality
characteristics, particularly
 
if they
 
are unique
 
relative to
 
competing mines,
 
(iii) assumed
 
transportation costs
 
and (iv)
 
other
mine costs that are contractually passed on to customers in certain commercial relationships.
Thermal.
 
Several factors
 
can influence
 
thermal coal
 
supply and
 
demand and
 
pricing. Demand
 
is sensitive
 
to total
 
electric
power generation volumes, which are determined in part by the impact of weather on heating and cooling demand, inter-fuel
competition in the electric power generation mix, changes in capacity (additions and retirements), inter-basin or inter-country
coal
 
competition,
 
coal
 
stockpiles
 
and
 
policy
 
and
 
regulations.
 
Supply
 
considerations
 
impacting
 
pricing
 
include
 
reserve
positions, mining methods, strip ratios, production costs
 
and capacity and the cost of new
 
supply (new mine developments or
extensions at existing mines).
The cost information that the QPs used for preliminary resource valuation and to estimate our proven and probable reserves
were
 
generally
 
internal
 
projected
 
future
 
costs
 
based
 
on
 
historical
 
costs
 
and
 
expected
 
future
 
trends.
 
The
 
estimated
 
costs
normally include
 
mining, processing,
 
transportation, royalty,
 
tax and
 
other mining-related
 
costs. Our
 
estimated mining
 
and
processing costs reflect projected changes in prices of
 
consumable commodities (mainly diesel fuel, natural gas, explosives
and steel), labor costs, geological
 
and mining conditions, targeted
 
product qualities and other
 
mining-related costs. Estimates
for other sales-related
 
costs (mainly transportation,
 
royalty and tax)
 
are based on
 
contractual prices
 
or fixed rates.
 
Specific
factors that may impact the cost at our various operations include:
•
Geological settings.
 
The geological
 
characteristics of
 
each mine
 
are among
 
the most
 
important factors
 
that determine
the mining cost. Our geology department conducts
 
the exploration program and provides geological models for
 
the
life-of-mine process. Coal seam depth, thickness, dipping angle, partings and quality constrain the available mining
methods and
 
size of
 
operations. Shallow
 
coal is
 
typically mined
 
by surface
 
mining methods
 
by which
 
the primary
cost is overburden removal.
 
Deep coal is typically mined
 
by underground mining methods where
 
the primary costs
include coal extraction, conveyance and roof control.
•
Scale of operations
 
and the equipment
 
sizes.
 
For surface mines,
 
our dragline systems
 
generally have a
 
lower unit
cost
 
than
 
truck-and-shovel
 
systems
 
for
 
overburden
 
removal.
 
The
 
longwall
 
operations
 
generally
 
are
 
more
 
cost
effective than bord-and-pillar operations for underground mines.
•
Commodity
 
prices.
 
For surface
 
mines, the
 
costs of
 
diesel fuel
 
and explosives
 
are major
 
components
 
of the
 
total
mining cost.
 
For underground
 
mines, the
 
steel used
 
for roof
 
bolts represents
 
a significant
 
cost. Commodity
 
price
forecasts are used to project those costs in the financial models we use to establish our reserves.
•
Target
 
product
 
quality.
 
By
 
targeting
 
a
 
premium
 
quality,
 
product,
 
our
 
mining
 
and
 
processing
 
processes
 
may
experience more coal
 
losses. By lowering product
 
quality,
 
the coal losses
 
can be minimized
 
and therefore a
 
lower
cost per
 
Mt can
 
be achieved.
 
In our
 
mine plans,
 
the product
 
qualities are
 
estimated to
 
correspond to
 
existing contracts
and forecasted market demands.
•
Transportation
 
costs.
 
We
 
have
 
entered
 
into
 
arrangements
 
with
 
third
 
parties
 
to
 
gain
 
access
 
to
 
transportation
infrastructure and
 
services where required,
 
including rail carriers
 
and port owners.
 
Where coal is
 
exported or sold
other than at the mine gate,
 
the costs associated with these
 
arrangements represent a significant portion of
 
both the
total cost
 
of supplying
 
coal to
 
customers and
 
of our
 
production costs.
 
As a
 
result, the
 
cost of
 
transportation is
 
not
only a key factor in our cost base but also in the purchasing decision of customers.
 
Our transportation costs vary by
region. See Item 1. “Business—Transportation”
 
for more information regarding transportation arrangements for
 
our
operations.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
95
•
Royalty costs.
 
As conditions to certain of the Tenements, Curragh is subject to royalties payable to the Queensland
government
 
as
 
described
 
in
 
Item
 
1.
 
“Business—Regulatory
 
Matters—Australia—Mineral
 
Resources
 
Act
 
1989
(Qld)”).
 
These
 
royalties
 
are
 
in
 
addition
 
to
 
the
 
Stanwell
 
rebate,
 
as
 
described
 
in
 
Item
 
1.
 
“Business—Customers—
Australia
 
Sales
 
and
 
Marketing—Stanwell.”
 
Royalty
 
costs
 
at
 
our
 
U.S.
 
Operations
 
are
 
based
 
upon
 
contractual
agreements for the coal leased from private owners and vary
 
from property to property and by the type of
 
mine (i.e.,
surface or underground). The
 
royalty rates under leases
 
at our U.S. Operations
 
range between 3% -
 
9% of revenues
from coal
 
sales. Under
 
some of
 
the leases,
 
we are
 
required to
 
pay minimum
 
royalties, regardless
 
of
 
production,
and/or
 
“wheelage
 
fees”
 
(i.e., fees
 
payable
 
on
 
coal
 
mined
 
and
 
removed
 
from
 
properties
 
other
 
than
 
the
 
particular
leasehold and hauled across the leasehold premises).
•
Black lung, severance and reclamation taxes.
 
Our U.S. Operations are subject to a federal black lung excise tax on
coal sold domestically.
•
Exchange rates.
 
Costs related
 
to our
 
Australian Operations
 
are predominantly
 
denominated in
 
A$, while
 
the coal
that our Australian Operations export is sold in
 
US$. As a result, A$-US$ exchange rates
 
impact the U.S. dollar cost
of our Australian Operations’ production.
For
 
further
 
discussion
 
of
 
comprehensive
 
risk
 
inherent
 
in
 
the
 
estimation,
 
see
 
Item
 
1A.
 
“Risk
 
Factors—Operational
 
and
Technology
 
Risks—We rely on
 
estimates of our
 
recoverable resources and
 
reserves, which are
 
complex due to
 
geological
characteristics of the properties and the number of assumptions made.”
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
96
ITEM 3.
 
LEGAL PROCEEDINGS.
We are
 
involved in
 
various
 
legal proceedings
 
occurring
 
in the
 
ordinary course
 
of business.
 
It is
 
the opinion
 
of
management, after consultation
 
with legal counsel,
 
that these matters
 
will not materially
 
affect our consolidated
financial position, results of operations or cash flows.
The Company is subject to a wide
 
variety of laws and regulations within the legal jurisdiction in
 
which it operates.
See “Part I, Item 1. Business—Regulatory Matters”
 
for additional information. The Company believes that
 
it is in
substantial compliance with federal, state and local laws
 
and regulations.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
97
ITEM 4. MINE SAFETY DISCLOSURES
Safety is the cornerstone of the Company’s values and is the number one priority
 
for all employees at Coronado
Global Resources.
 
Our U.S. Operations
 
include multiple mining
 
complexes across
 
three states and
 
are regulated by
 
both the U.S.
Mine Safety
 
and Health
 
Administration, or
 
MSHA, and
 
state regulatory
 
agencies. Under
 
regulations mandated
by the Federal Mine Safety and Health Act of 1977, or the Mine Act, MSHA inspects our U.S. mines on a regular
basis and issues various citations and orders when it believes
 
a violation has occurred under the Mine Act.
In accordance
 
with
 
Section
 
1503(a) of
 
the Dodd-Frank
 
Wall
 
Street Reform
 
and
 
Consumer Protection
 
Act and
Item 104 of Regulation S-K (17 CFR 229.104), each operator of a coal or other mine is required to report certain
mine safety results in its periodic reports filed with the SEC
 
under the Exchange Act.
Information pertaining to mine safety
 
matters is included in Exhibit
 
95.1 attached to this Annual
 
Report on Form
10-K. The disclosures reflect the
 
United States mining operations only, as these requirements do
 
not apply to our
mines operated outside the United States.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
98
ITEM 5.
 
MARKET FOR REGISTRANT’S COMMON EQUITY,
 
RELATED
 
STOCKHOLDER MATTERS
 
AND
ISSUER PURCHASES OF EQUITY SECURITIES.
Market Information
Our CDIs, each
 
representing one-tenth
 
of one share
 
of our common
 
stock, have
 
been listed on
 
the ASX under
the
 
trading
 
symbol
 
“CRN”
 
since
 
October 23,
 
2018.
 
Prior
 
to
 
such
 
time,
 
there
 
was
 
no
 
public
 
market
 
for
 
our
securities. There is no principal market in the United States
 
for our CDIs or shares of our common stock.
Holders
As of December 31, 2022, we had 167,645,373
 
shares of our common stock issued
 
and outstanding with 7,513
holders of record.
 
The holders included CHESS
 
Depositary Nominees Pty Limited,
 
which held 90,337,270 shares
of our common stock in the form of
 
CDIs on behalf of the CDI holders; there were 7,512 registered owners
 
of our
CDIs on December 31, 2022.
Series A Preferred Share
On September
 
20, 2018,
 
we issued
 
the Series
 
A Preferred
 
Share to
 
Coronado
 
Group LLC,
 
at par
 
value.
 
The
offer, sale, and issuance of the Series A Share were deemed to be exempt from registration under
 
the Securities
Act in reliance on Section
 
4(a)(2) of the Securities Act as
 
transactions by an issuer not involving
 
a public offering.
The recipient of the Series A Share acquired the Series A Share for investment only and not with a view to or for
sale in connection with any distribution thereof and appropriate
 
legends were affixed to the Series A Share.
Dividends
The
 
payment
 
of
 
dividends
 
is
 
at
 
the
 
discretion
 
of
 
the
 
Board
 
of
 
Directors.
 
The
 
decision
 
as
 
to
 
whether
 
or
 
not
 
a
dividend will be
 
paid will
 
be subject to
 
a number of
 
considerations including
 
the general
 
business environment,
operating
 
results,
 
cash
 
flows,
 
future
 
capital
 
requirements,
 
regulatory
 
and
 
contractual
 
restrictions,
 
as
 
well
 
as
applicable
 
covenants
 
under
 
the
 
indenture
 
governing
 
our
 
senior
 
secured
 
notes
 
and
 
covenants
 
under
 
the
 
ABL
Facility and any other factors the Board of Directors may
 
consider relevant.
 
Our objective in setting our dividend policy is to deliver
 
stockholder returns while maintaining flexibility to pursue
our strategic
 
initiatives within
 
a prudent
 
capital structure.
 
Our dividend
 
policy is
 
to distribute
 
between 60%
 
and
100%
 
of
 
available
 
free
 
cash.
 
Available
 
free
 
cash
 
is
 
defined
 
as
 
net
 
cash
 
from
 
operating
 
activities
 
less
 
capital
expenditure, acquisition expenditure,
 
amounts reserved for
 
capital expenditure and
 
acquisition expenditure and
amounts required for
 
debt servicing. In
 
circumstances where there is
 
surplus available free cash,
 
at the discretion
of
 
our
 
Board
 
of
 
Directors
 
and
 
in
 
light
 
of
 
business
 
and
 
market
 
conditions,
 
we
 
may
 
consider
 
the
 
potential
 
for
additional
 
stockholder
 
returns
 
through
 
special
 
dividends
 
and
 
share
 
buy-backs
 
as
 
part
 
of
 
its
 
broader
 
capital
management strategy.
Summary Description of the Company’s
 
Non-Stockholder Approved Equity Compensation
 
Plans
The Company does not have any non-stockholder approved
 
equity compensation plans.
Recent Sales of Unregistered Securities
Other than as previously
 
disclosed in a Quarterly
 
Report on Form 10-Q
 
or in a Current
 
Report on Form 8-K,
 
we
did not issue
 
any shares of
 
our common stock
 
in a transaction
 
that was
 
not registered under
 
the Securities Act
during the year ended December 31, 2022.
Purchases of Equity Securities by the Issuer and
 
Affiliated Purchases
We had no repurchases of equity securities for the
 
three months ended December 31, 2022.
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
99
ITEM 6.
 
[Reserved]
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
100
ITEM 7.
 
MANAGEMENT’S DISCUSSION
 
AND ANALYSIS
 
OF FINANCIAL
 
CONDITION AND
 
RESULTS
 
OF
OPERATIONS
The following
 
Management’s Discussion
 
and Analysis
 
of our Financial
 
Condition and
 
Results of
 
Operations, or
MD&A, should be read in conjunction with the Consolidated Financial Statements and the related notes to those
statements included elsewhere in this Annual Report on Form
 
10-K.
 
Overview
For the year ended December 31,
 
2022, we produced 16.0
MMt and sold 16.4 MMt of
 
coal. Met coal and thermal
coal sales
 
represented
 
77.2%
 
and 22.8%,
 
respectively,
 
of our
 
total volume
 
of coal
 
sold and
 
95.3% and
 
4.7%,
respectively, of total
 
coal revenues.
 
During the year
 
ended December 31,
 
2022, seaborne index
 
prices reached record
 
highs globally,
 
driven by the
continued impact
 
of the
 
Russian invasion
 
of Ukraine,
 
which removed
 
Russian Met
 
coal from
 
key markets,
 
Met
coal crossover trades
 
into thermal market
 
due to
 
elevated demand for
 
thermal coal and
 
supply constraints caused
by wet weather and logistical issues.
Coronado has
 
continued to
 
take advantage
 
of its
 
unique geographical
 
diversification as
 
a Met
 
coal supplier
 
of
scale to meet the requirements of steel customers across the globe. Our U.S. Operations have taken advantage
of current unique market fundamentals created
 
by the trade restrictions on Russian coal
 
by switching coal sales
from
 
China
 
to
 
Europe
 
providing
 
higher
 
returns
 
for
 
our
 
products.
 
In
 
addition
 
to
 
geographical
 
diversification,
Coronado is well
 
positioned to take
 
advantage of price
 
arbitrage between the
 
Thermal and Met
 
coal markets to
maximize price realizations.
Our results
 
of operations
 
for the
 
year ended
 
December 31,
 
2022 benefited
 
from higher
 
averaged realized
 
Met
price per Mt sold,
 
partially offset by (1) significant unprecedented
 
wet weather events impacting production at
 
our
Australian
 
Operations,
 
(2)
 
inflationary
 
pressure,
 
including
 
the
 
higher
 
cost
 
of
 
fuel
 
and
 
labor
 
costs,
 
(3)
 
adverse
geological
 
conditions
 
and
 
weather
 
events
 
at
 
our
 
U.S.
 
Operations
 
resulting
 
in
 
lower
 
production
 
and
 
higher
equipment
 
maintenance
 
costs,
 
(4)
 
additional
 
fleets
 
mobilized
 
at
 
our
 
Australian
 
Operations
 
to
 
improve
 
coal
recovery and (5) higher sales related costs (Stanwell rebate,
 
royalties and freight costs).
 
Coal revenues of $3.5
billion
for the year ended December 31, 2022, increased by 67.3% compared to the same
period in 2021, was largely driven by higher
 
market price of coal resulting in increased
 
average realized Met coal
pricing of $265.8 per Mt sold,
 
$127.8 per Mt sold higher than 2021. Sales
 
volumes were lower for the year ended
December
 
31,
 
2022,
 
compared
 
to
 
2021
 
primarily
 
due
 
to
 
lower
 
production
 
caused
 
by
 
significant
 
wet
 
weather
events at our Australian Operations and adverse geological
 
conditions at our U.S. Operations.
 
Operating costs for the year
 
ended December 31, 2022,
 
were $680.5 million, or
 
41.6%, higher compared to
 
the
corresponding
 
period
 
in
 
2021
 
driven
 
by
 
inflationary
 
pressures
 
on
 
labor
 
and
 
supply
 
costs,
 
adverse
 
geological
conditions
 
in
 
certain
 
mines
 
of
 
our
 
U.S.
 
Operations,
 
additional
 
contractor
 
fleets
 
deployed
 
at
 
our
 
Australian
Operations to accelerate
 
overburden removal and
 
increase coal availability, higher maintenance
 
costs and higher
sales related costs, resulting in mining costs of $88.4 per Mt sold for the year ended December 31, 2022, 34.5%
higher than 2021.
Dividends
During the year ended December 31, 2022, Coronado
 
paid total dividends of $700.2 million to stockholders
 
and
CDI holders on
 
the ASX, net
 
of $1.4 million
 
foreign exchange gain on
 
payment of dividends
 
to certain CDI
 
holders
that elected to be paid in Australian dollars.
Liquidity
As
 
of
 
December
 
31,
 
2022,
 
the
 
Company’s
 
net
 
cash
 
position
 
was
 
$92.1
 
million,
 
consisting
 
of
 
cash
 
(excluding
restricted cash) of $334.4 million and $242.3 million aggregate principal amount of Notes outstanding. Coronado
had available
 
liquidity of
 
$434.4 million
 
as of
 
December 31,
 
2022, comprising
 
cash (excluding
 
restricted cash)
and undrawn available borrowings $100.0 million under our ABL facility.
Notes redemption
During the year ended December 31, 2022, we redeemed $72.7 million
 
of the Notes,
 
$37.7 million of which were
in relation to offers made in connection with dividends
 
paid during the period.
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
101
Safety
For
 
our
 
Australian
 
Operations,
 
the
 
twelve-month
 
rolling
 
average
 
Total
 
Reportable
 
Injury
 
Frequency
 
Rate
 
at
December 31, 2022
 
was 3.92 compared
 
to 3.07
 
at the end
 
of December
 
31, 2021. At
 
our U.S. Operations,
 
the
twelve-month rolling average Total
 
Reportable Incident Rate, at December 31, 2022 was 2.42 compared to 2.51
at the
 
end of
 
December 31, 2021.
 
Reportable rates for
 
our Australian Operations
 
and U.S.
 
Operations were below
the relevant industry benchmarks.
The safety of our workforce is
 
our number one priority and we
 
remain focused on the safety and
 
wellbeing of all
employees and contracting parties.
Segment Reporting
In accordance with
 
Accounting Standards Codification,
 
or ASC, 280,
 
Segment Reporting, we
 
have adopted the
following reporting
 
segments: Australia and
 
the United
 
States. In
 
addition, “Other and
 
Corporate” is
 
not a
 
reporting
segment but is disclosed for the purposes of reconciliation
 
to our Consolidated Financial Statements.
Results of Operations
How We Evaluate Our Operations
We
 
evaluate
 
our
 
operations
 
based
 
on
 
the
 
volume
 
of
 
coal
 
we
 
can
 
safely
 
produce
 
and
 
sell
 
in
 
compliance
 
with
regulatory
 
standards,
 
and
 
the
 
prices
 
we
 
receive
 
for
 
our
 
coal.
 
Our
 
sales
 
volume
 
and
 
sales
 
prices
 
are
 
largely
dependent upon
 
the terms
 
of our
 
coal sales
 
contracts, for
 
which prices
 
generally are
 
set based
 
on daily
 
index
averages, on a quarterly basis or on annual fixed price
 
contracts.
Our management
 
uses a
 
variety of
 
financial and
 
operating metrics
 
to analyze
 
our performance.
 
These metrics
are significant factors
 
in assessing our
 
operating results
 
and profitability.
 
These financial
 
and operating metrics
include: (i) safety and environmental metrics; (ii) Adjusted EBITDA; (iii) total sales volumes and average realized
price
 
per
 
Mt
 
sold,
 
which
 
we
 
define
 
as
 
total
 
coal
 
revenues
 
divided
 
by
 
total
 
sales
 
volume;
 
(iv)
 
Met
 
coal
 
sales
volumes and average realized Met price per
 
Mt sold, which we define as Met coal
 
revenues divided by Met coal
sales volume; (v)
 
average segment mining
 
costs per Mt sold,
 
which we define
 
as mining costs
 
divided by sales
volumes (excluding
 
non-produced coal)
 
for the
 
respective segment;
 
and (vi)
 
average segment
 
operating costs
per Mt sold, which we define as segment operating costs
 
divided by sales volumes for the respective segment.
Coal revenues are shown on our Consolidated Statements of Operations
 
and Comprehensive Income exclusive
of other
 
revenues. Generally,
 
export sale
 
contracts for
 
our Australian
 
Operations require
 
us to
 
bear the
 
cost of
freight
 
from
 
our
 
mines
 
to
 
the
 
applicable
 
outbound
 
shipping
 
port,
 
while
 
freight
 
costs
 
from
 
the
 
port
 
to
 
the
 
end
destination are
 
typically borne by
 
the customer. Sales to
 
the export market
 
from our U.S.
 
Operations are generally
recognized when the title to the coal passes to the customer at the mine load out similar to a domestic sale.
 
For
our domestic sales, customers typically bear the cost of freight. As such, freight expenses are excluded from the
cost of coal revenues to allow for consistency and comparability
 
in evaluating our operating performance.
Non-GAAP Financial Measures; Other Measures
The following discussion of
 
our results includes
 
references to and analysis
 
of Adjusted EBITDA and
 
mining costs,
which
 
are
 
financial
 
measures
 
not
 
recognized
 
in
 
accordance
 
with
 
U.S.
 
GAAP.
 
Non-GAAP
 
financial
 
measures,
including Adjusted EBITDA, are used by investors to
 
measure our operating performance.
Adjusted EBITDA, a non-GAAP measure, is defined as earnings before interest, tax, depreciation, depletion and
amortization
 
and
 
other
 
foreign
 
exchange
 
losses.
 
Adjusted
 
EBITDA
 
is
 
also
 
adjusted
 
for
 
certain
 
discrete
 
non-
recurring items that we exclude in
 
analyzing each of our segments’
 
operating performance. Adjusted EBITDA
 
is
not intended to
 
serve as an
 
alternative to U.S. GAAP
 
measures of performance
 
and may not
 
be comparable to
similarly titled measures presented by
 
other companies. A reconciliation
 
of Adjusted EBITDA to its
 
most directly
comparable measure under U.S. GAAP is included below.
 
Segment
 
Adjusted
 
EBITDA
 
is
 
defined
 
as
 
Adjusted
 
EBITDA
 
by
 
operating
 
and
 
reporting
 
segment,
 
adjusted
 
for
certain
 
transactions,
 
eliminations
 
or
 
adjustments
 
that
 
our
 
CODM
 
does
 
not
 
consider
 
for
 
making
 
decisions
 
to
allocate resources among segments or assessing segment performance.
 
Segment Adjusted EBITDA is used as
a
 
supplemental
 
financial
 
measure
 
by
 
management
 
and
 
by
 
external
 
users
 
of
 
our
 
Consolidated
 
Financial
Statements such
 
as investors,
 
industry analysts
 
and lenders
 
to assess
 
the operating
 
performance of
 
the business.
Mining costs,
 
a non-GAAP
 
measure, are
 
based on
 
the reported
 
cost of
 
coal revenues,
 
which is
 
shown on
 
our
statement of
 
operations and comprehensive
 
income exclusive of
 
freight expense, Stanwell
 
rebate, other royalties,
depreciation,
 
depletion
 
and
 
amortization
 
and
 
selling,
 
general
 
and
 
administrative
 
expenses,
 
adjusted
 
for
 
other
items that do not relate
 
directly to the costs incurred
 
to produce coal at the mine.
 
Mining costs exclude these cost
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
102
components as
 
our CODM
 
does not
 
view these
 
costs as
 
directly attributable
 
to the
 
production of
 
coal. Mining
costs
 
is
 
used
 
as
 
a
 
supplemental
 
financial
 
measure
 
by
 
management,
 
providing
 
an
 
accurate
 
view
 
of
 
the
 
costs
directly attributable to the production
 
of coal at our mining
 
segments, and by external
 
users of our Consolidated
Financial Statements,
 
such as
 
investors, industry
 
analysts and
 
ratings agencies,
 
to assess
 
our mine
 
operating
performance in comparison to the mine operating performance
 
of other companies in the coal industry.
Year Ended December 31,
 
2022 Compared to Year
 
Ended December 31, 2021
Summary
The financial and operational highlights for the year ended December
 
31, 2022:
•
 
Net income
 
increased by
 
$582.3 million,
 
from a
 
net income
 
of $189.4
 
million for
 
the year
 
ended December
31, 2021,
 
to a
 
net income
 
of $771.7
 
million for
 
the year
 
ended December
 
31, 2022.
 
The increase
 
was
driven by higher revenues, partially offset by higher
 
operating costs and higher income tax expense.
•
 
Supply concerns
 
in key
 
Met coal markets
 
driven by wet
 
weather,
 
logistic issues,
 
the ongoing
 
impact of
the Russia and Ukraine
 
war on global coal
 
supply chain and Met
 
coal crossover trades into
 
the thermal
market caused considerable
 
volatility in coal pricing,
 
resulting in average
 
realized Met price
 
per Mt sold
of $265.8 for the year ended December
 
31, 2022, 92.6% higher
compared to $138.0 per Mt sold for
 
the
year ended December 31, 2021.
•
 
Total sales volume was 16.4 MMt for the
 
year ended December 31, 2022,
 
or 1.5 MMt lower
 
than the year
ended December
 
31, 2021.
 
The lower
 
sales volumes
 
were primarily
 
driven by
 
significant wet
 
weather
events
 
at
 
our
 
Australian
 
Operations
 
and
 
adverse
 
geological
 
and
 
weather
 
events
 
at
 
one
 
of
 
our
 
mine
complexes at our U.S. Operations.
•
 
Adjusted EBITDA for the year
 
ended December 31, 2022, totaled
 
$1,215.6 million, an increase of
 
$729.5
million, from Adjusted EBITDA of $486.1 million for
 
the year ended December 31, 2021, driven by
 
higher
coal revenues partially offset by higher operating
 
costs.
•
 
Cash
 
provided
 
by
 
operating
 
activities
 
was
 
$926.6 million
 
for
 
the
 
year
 
ended
 
December
 
31,
 
2022,
 
an
increase of $484.6 million
 
compared to $442.0 million for the year ended
 
December 31, 2021.
•
 
As of December
 
31, 2022 the
 
Company had total
 
available liquidity of
 
$434.4 million, consisting
 
of $334.4
million of cash (excluding restricted cash) and $100.0 million
 
of availability under the ABL Facility.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
103
For Year Ended December 31,
(US$ in thousands)
2022
2021
Change
%
Revenues:
Coal revenues
3,527,626
2,108,331
1,419,295
67.3%
Other revenues
43,916
40,140
3,776
9.4%
Total
 
revenues
3,571,542
2,148,471
1,423,071
66.2%
Costs and expenses:
Cost of coal revenues (exclusive of items shown
separately below)
1,515,585
1,195,250
320,335
26.8%
Depreciation, depletion and amortization
167,046
177,875
(10,829)
(6.1%)
Freight expenses
249,081
241,862
7,219
3.0%
Stanwell rebate
165,995
55,403
110,592
199.6%
Other royalties
385,065
142,751
242,314
169.7%
Selling, general, and administrative expenses
42,499
30,666
11,833
38.6%
Restructuring costs
—
2,300
(2,300)
(100.0%)
Total
 
costs and expenses
2,525,271
1,846,107
679,164
36.8%
Other income (expenses):
Interest expense, net
(67,632)
(68,062)
430
(0.6%)
Loss on debt extinguishment
(5,336)
(8,477)
3,141
(37.1%)
(Increase) decrease in provision for discounting and
credit losses
(3,821)
8,042
(11,863)
(147.5%)
Gain on disposal of asset
—
14,845
(14,845)
(100.0%)
Other, net
33,795
(6,187)
39,982
(646.2%)
Total
 
other expense, net
(42,994)
(59,839)
16,845
(28.2%)
Income before tax
1,003,277
242,525
760,752
313.7%
Income tax expense
(231,574)
(53,102)
(178,472)
336.1%
Net income
771,703
189,423
582,280
307.4%
Less: Net loss attributable to noncontrolling interest
—
(2)
2
(100.0%)
Net income attributable to Coronado Global
Resources Inc.
771,703
189,425
582,278
307.4%
Coal revenues
Coal revenues
 
were $3,527.6
 
million
 
for the
 
year
 
ended December
 
31, 2022,
 
an
 
increase of
 
$1,419.3
 
million,
compared
 
to
 
$2,108.3 million
 
for
 
the
 
year
 
ended
 
December
 
31,
 
2021.
 
This
 
increase
 
was
 
driven
 
by
 
favorable
market conditions and higher coal
 
price indices, which resulted in
 
a higher average realized Met
 
price per Mt sold
for the year ended December
 
31, 2022 of $265.8, compared
 
to $138.0 per Mt sold
 
for the same period in
 
2021.
 
This increase was
 
partially offset by 1.8
 
MMt lower Met
 
coal sales volume
 
compared to the
 
year ended December
31,2021, primarily a result of above average rainfall impacting
 
production at our Australian Operations.
Cost of coal revenues (exclusive of Items shown
 
separately below)
Cost of
 
coal revenues is
 
comprised of
 
costs related to
 
produced tons sold,
 
along with
 
changes in
 
both the
 
volumes
and carrying values of coal inventory.
 
Cost of coal revenues include items
 
such as direct operating costs, which
include employee-related costs, materials and supplies, contractor services, coal handling and preparation costs
and production taxes.
Total
 
cost of coal revenues
 
was $1,515.6 million for
 
the year ended December
 
31, 2022, an
 
increase of $320.3
million, or
 
26.8%, compared
 
to $1,195.3
 
million for
 
the year
 
ended December
 
31, 2021.
 
Cost of
 
coal revenues
for our U.S.
 
Operations increased $171.3 million during the
 
year ended December 31, 2022,
 
driven by the impact
of
 
inflation
 
on
 
labor
 
and
 
supply
 
costs,
 
adverse
 
geological
 
conditions
 
in
 
certain
 
mines
 
of
 
our
 
U.S.
 
Operations
resulting
 
in
 
unplanned
 
maintenance
 
costs,
 
and
 
increased
 
purchased
 
coal
 
transactions
 
to
 
meet
 
certain
 
sales
commitments.
 
Cost
 
of
 
coal
 
revenues
 
for
 
our
 
Australian
 
Operations
 
for
 
the
 
year
 
ended
 
December
 
31,
 
2022
increased $149.1 million, largely due to additional fleets mobilized
 
to accelerate overburden removal, inflationary
pressure on fuel pricing and labor costs and increased purchased coal transactions to meet sales commitments.
Higher costs
 
were partially
 
offset by
 
a favorable
 
average foreign
 
exchange rate
 
on translation
 
of the Australian
Operations for
 
the year
 
ended December
 
31, 2022,
 
of A$/US$:
 
0.70 compared
 
to 0.75
 
for the
 
same period
 
in
2021.
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
104
Depreciation, depletion and amortization
Depreciation, depletion and amortization were $167.0 million for
 
the year ended December 31, 2022,
 
a decrease
of
 
$10.8 million,
 
compared
 
to
 
$177.9
 
million
 
for
 
the
 
year
 
ended
 
December
 
31,
 
2021.
 
The
 
decrease
 
was
associated with a
 
favorable average foreign
 
exchange rate on
 
translation of the
 
Australian Operations,
 
partially
offset by depreciation on equipment brought into
 
service during the year ended December 31, 2022.
Freight expenses
Freight expenses of $249.1 million for the year
 
ended December 31, 2022, increased by
 
$7.2 million, compared
to $241.9
 
million for
 
the year
 
ended December
 
31, 2021.
 
Our U.S.
 
Operations contributed
 
$15.9 million
 
to the
increase, due to certain contracts for which we arrange and pay for transportation to port that did not exist to the
same extent in 2022
 
combined with higher rail freight
 
rates due the impact of
 
inflationary pressures in the market,
partially offset by the
 
benefits of lower
 
average foreign exchange
 
rate on translation
 
of freight cost
 
from Australian
Operations.
Stanwell rebate
The Stanwell
 
rebate was
 
$166.0 million
 
for the
 
year ended
 
December 31,
 
2022, an
 
increase of
 
$110.6 million,
compared to
 
$55.4 million
 
for the
 
year
 
ended December
 
31, 2021.
 
The increase
 
was largely
 
driven by
 
higher
realized
 
export
 
reference
 
coal
 
pricing
 
for
 
the
 
prior
 
twelve-month
 
period
 
used
 
to
 
calculate
 
the
 
rebate,
 
partially
offset by the favorable average foreign exchange
 
rate on translation of the Australian Operations.
Other royalties
Other
 
royalties
 
were
 
$385.1 million
 
for
 
the
 
year
 
ended
 
December
 
31,
 
2022,
 
an
 
increase
 
of
 
$242.3 million,
 
as
compared to
 
$142.8 million
 
for the
 
year ended
 
December 31,
 
2021.
 
Higher royalties
 
were a
 
product of
 
higher
average
 
realized
 
export
 
pricing
 
and
 
the
 
adverse
 
impact
 
of
 
the
 
new
 
Queensland
 
Government
 
royalty
 
regime
applicable from July 1, 2022 to our Australian Operations.
Other, net
Other,
 
net
 
was
 
a
 
gain
 
of
 
$33.8
 
million
 
in
 
the
 
year
 
ended
 
December
 
31,
 
2022,
 
an
 
increase
 
of
 
$40.0
 
million
compared to
 
a net
 
loss of
 
$6.2 million
 
for the
 
year ended
 
December 31,
 
2021. The
 
increase largely
 
relates to
foreign exchange gains
 
recognized in the
 
translation of short-term
 
inter-entity balances in
 
certain entities within
the
 
Group
 
that
 
are
 
denominated
 
in
 
currencies
 
other
 
than
 
their
 
respective
 
functional
 
currencies
 
due
 
to
 
the
favorable average foreign exchange rate on translation.
Income tax expense
Income tax
 
expense of
 
$231.6 million
 
for the
 
year ended
 
December 31,
 
2022, increased
 
by $178.5
 
million, as
compared to $53.1 million for the year ended December
 
31, 2021.
The income tax expense
 
for the year ended
 
December 31, 2022 resulted in
 
an annual effective tax rate
 
of 23.8%,
an increase from 21.9% for the year ended December
 
31, 2021.
Year Ended December 31,
 
2021 Compared to Year
 
Ended December 31, 2020
The Company’s comparison of 2021 results to
 
2020 results is included in the
 
Company’s
, under Part II Item
 
7, “Management’s Discussion and Analysis
of Financial Condition and Results of Operations”.
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
105
Supplemental Segment Financial Data
Year Ended December 31,
 
2022 Compared to Year
 
Ended December 31, 2021
Australian Operations
For Year Ended December 31,
(US$ in thousands)
2022
2021
Change
%
Sales Volume (MMt)
10.0
11.3
(1.3)
(12.1)%
Total
 
revenues ($)
2,116,555
1,315,851
800,704
60.9%
Coal revenues ($)
2,078,518
1,279,736
798,782
62.4%
Average realized price per Mt sold ($/Mt)
208.9
113.1
95.8
84.7%
Met sales volume (MMt)
6.5
8.2
(1.7)
(20.7)%
Met coal revenues ($)
1,968,173
1,171,869
796,304
68.0%
Average realized Met price per Mt sold ($/Mt)
303.1
143.1
160.0
111.8%
Mining costs ($)
864,616
736,782
127,834
17.4%
Mining costs per Mt sold ($/Mt)
89.5
67.6
21.9
32.4%
Operating costs ($)
1,575,786
1,111,248
464,538
41.8%
Operating costs per Mt sold ($/Mt)
158.3
98.2
60.1
61.2%
Segment Adjusted EBITDA ($)
541,208
204,992
336,216
164.0%
Coal
 
revenues
 
for
 
Australian
 
Operations
 
for
 
the
 
year
 
ended
 
December
 
31,
 
2022,
 
were
 
$2,078.5 million,
 
an
increase of $798.8 million, or 62.4%, compared
 
to $1,279.7 million for the year
 
ended December 31, 2021. This
increase
 
was
 
driven
 
by
 
higher
 
average
 
realized
 
Met
 
price
 
of
 
$303.1
 
per
 
Mt,
 
an
 
increase
 
of
 
$160.0
 
per
 
Mt,
compared to $143.1 per Mt sold during the same period in 2021. The higher realized price during the period was
primarily driven by disruption in supply dynamics caused by the conflict between
 
Russia and Ukraine, as well as
supply constraints from key Met
 
coal markets due to unseasonal
 
wet weather and logistical issues. Sales
 
volume
of 10.0 MMt was 1.3 MMt lower compared to 11.3
 
MMt for the year ended December 31, 2021, mainly driven by
significant unprecedented wet
 
weather events experienced
 
at the Curragh
 
mine during 2022
 
which significantly
reduced mining activities and coal availability.
Operating costs increased by $464.5 million, or 41.8%, for the year ended December 31, 2022, compared to the
year
 
ended
 
December
 
31,
 
2021.
 
The
 
increase
 
was
 
driven
 
by
 
a
 
higher
 
mining
 
costs,
 
higher
 
Stanwell
 
rebate
(mainly due
 
to higher
 
realized coal
 
pricing) and
 
greater royalties,
 
due to higher
 
coal revenues
 
and the
 
adverse
impact of the amended royalty.
 
Mining costs were $127.8 million, or 17.4%, higher for the year ended December
31, 2022 compared to the same
 
period in 2021, primarily due
 
to inflationary pressures and additional
 
contractor
fleets mobilized
 
during the
 
first half
 
of 2022
 
at our
 
Australian Operations,
 
partially offset
 
by favorable
 
average
foreign exchange on
 
translation of our
 
Australian Operations. Increased
 
costs combined with
 
lower sales
 
volumes
resulted in higher Mining
 
and Operating costs per Mt
 
sold of $89.5 and
 
$158.3, respectively, an increase of $21.9
and $60.1, respectively,
 
compared to the same period in 2021.
For the year
 
ended December 31,
 
2022, Segment
 
Adjusted EBITDA was
 
$541.2 million, an
 
increase of $336.2
million compared
 
to Segment
 
Adjusted EBITDA
 
of $205.0
 
million for
 
the year
 
ended December
 
31, 2021.
 
This
increase was primarily driven by higher coal revenues
 
partially offset by higher operating costs.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
106
United States
For Year Ended December 31,
(US$ in thousands)
2022
2021
Change
%
Sales Volume (MMt)
6.4
6.4
—
(0.1)%
Total
 
revenues ($)
1,454,987
832,620
622,367
74.7%
Coal revenues ($)
1,449,108
828,595
620,513
74.9%
Average realized price per Mt sold ($/Mt)
225.2
128.6
96.6
75.1%
Met sales volume (MMt)
6.2
6.3
(0.1)
(1.7)%
Met coal revenues ($)
1,394,880
822,000
572,880
69.7%
Average realized Met price per Mt sold ($/Mt)
226.5
131.2
95.3
72.6%
Mining costs ($)
531,812
392,362
139,450
35.5%
Mining costs per Mt sold ($/Mt)
86.5
62.3
24.2
38.9%
Operating costs ($)
739,940
524,018
215,922
41.2%
Operating costs per Mt sold ($/Mt)
115.0
81.3
33.7
41.5%
Segment Adjusted EBITDA ($)
716,661
312,048
404,613
129.7%
Coal revenues increased by $620.5 million, or
 
74.9%, to $1,449,1 million for the
 
year ended December 31, 2022,
as compared
 
to
 
$828.6 million
 
for the
 
year
 
ended December
 
31, 2021.
 
This increase
 
was
 
mainly driven
 
by
 
a
higher average
 
realized
 
Met price
 
per Mt
 
sold for
 
the
 
year ended
 
December 31
 
,
 
2022 of
 
$226.5 compared
 
to
$131.2 per Mt sold for
 
the same period in 2021.
 
Higher average realized Met price benefited
 
from strong demand
and supply shortage
 
in the global
 
seaborne export markets
 
and high demand
 
of U.S.-sourced coal
 
into Europe
due to trade restrictions on Russian coal.
Operating costs
increased by $215.9 million, or 41.2%, to $739.9 million for the year ended December 31, 2022,
compared to
 
operating costs
 
of $524.0
 
million for
 
the year
 
ended December
 
31, 2021
 
driven by
 
higher mining
costs, royalties, freight expenses
 
and increase in purchase
 
d
 
coal to meet sales
 
commitments.
 
Higher operating
costs were largely driven
 
by increase in mining
 
costs of $139.5 million,
 
or 35.5%. compared to
 
the same period
in 2021, as
 
a result
 
of adverse
 
geological conditions
 
causing higher
 
maintenance costs,
 
higher subcontractor’s
costs
 
due to labor shortages and overall inflationary pressures
 
on labor, materials and supplies.
Segment Adjusted EBITDA of $716.7 million for
 
the year ended December 31, 2022 increased by
 
$404.6 million,
or
129.7%, compared to
 
$312.0 million for
 
the year ended
 
December 31,
 
2021. This increase
was primarily driven
by a higher average realized Met price per Mt sold, partially offset
 
by higher operating costs.
Corporate and Other Adjusted EBITDA
The following table presents a summary of the components
 
of Corporate and Other Adjusted EBITDA:
For Year Ended December 31,
(US$ in thousands)
2022
2021
Change
%
Selling, general, and administrative expenses
42,499
30,666
11,833
38.6%
Other, net
(254)
241
(495)
(205.4)%
Total
 
Corporate and Other Adjusted EBITDA
42,245
30,907
11,338
36.7%
Corporate
 
and
 
other
 
costs
 
increased
 
$11.3
 
million
 
to
 
$42.2
 
million
 
for
 
the
 
year
 
ended
 
December
 
31,
 
2022,
compared
 
to
 
$30.9
 
million
 
for
 
the
 
year
 
ended
 
December
 
31,
 
2021.
 
The
 
increase
 
in
 
selling,
 
general,
 
and
administrative
 
expenses
 
was
 
largely
 
driven
 
by
 
inflationary
 
pressures
 
on
 
corporate
 
and
 
labor
 
costs,
 
corporate
activities resuming to pre-COVID-19 pandemic levels and timing
 
or certain corporate costs.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
107
Mining and operating costs for the Year Ended December 31, 2022 compared to Year
 
December 31, 2021
A reconciliation of
 
segment costs and
 
expenses, segment operating
 
costs, and segment
 
mining costs is
 
shown
below:
For Year Ended December 31, 2022
(US$ in thousands)
Australia
United States
Other /
Corporate
Total
Consolidated
Total costs and
 
expenses
1,658,105
823,529
43,637
2,525,271
Less: Selling, general and administrative expense
(24)
—
(42,475)
(42,499)
Less: Depreciation, depletion and amortization
(82,295)
(83,589)
(1,162)
(167,046)
Total operating costs
1,575,786
739,940
—
2,315,726
Less: Other royalties
(330,503)
(54,562)
—
(385,065)
Less: Stanwell rebate
(165,995)
—
—
(165,995)
Less: Freight expenses
(153,068)
(96,013)
—
(249,081)
Less: Other non-mining costs
(61,604)
(57,553)
—
(119,157)
Total mining costs
864,616
531,812
—
1,396,428
Sales Volume excluding non-produced
 
coal (MMt)
9.7
6.1
—
15.8
Mining cost per Mt sold ($/Mt)
89.5
86.5
—
88.4
For Year Ended December 31, 2021
(US$ in thousands)
Australia
United States
Other /
Corporate
Total
Consolidated
Total costs and
 
expenses
1,202,807
611,611
31,689
1,846,107
Less: Selling, general and administrative expense
—
—
(30,666)
(30,666)
Less: Restructuring costs
(2,300)
—
—
(2,300)
Less: Depreciation, depletion and amortization
(89,259)
(87,593)
(1,023)
(177,875)
Total operating costs
1,111,248
524,018
—
1,635,266
Less: Other royalties
(117,001)
(25,750)
—
(142,751)
Less: Stanwell rebate
(55,403)
—
—
(55,403)
Less: Freight expenses
(161,703)
(80,159)
—
(241,862)
Less: Other non-mining costs
(40,359)
(25,747)
—
(66,106)
Total mining costs
736,782
392,362
—
1,129,144
Sales Volume excluding non-produced
 
coal (MMt)
10.9
6.3
—
17.2
Mining cost per Mt sold ($/Mt)
67.6
62.3
—
65.7
Average realized Met price for the Year
 
Ended December 31, 2022 compared to Year
 
December 31, 2021
A reconciliation of the Company’s average realized
 
Met coal revenue is shown below:
For Year Ended December 31,
(US$ in thousands)
2022
2021
Change
%
Met sales volume (MMt)
12.7
14.5
(1.8)
(12.4)%
Met coal revenues ($)
3,363,053
1,993,869
1,369,184
68.7%
Average realized met price per Mt sold ($/Mt)
265.8
138.0
127.8
92.6%
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
108
Reconciliation of Non-GAAP Financial Measures
Adjusted EBITDA
For year ended December 31,
(US$ in thousands)
2022
2021
2020
Reconciliation to Adjusted EBITDA:
Net income (loss)
771,703
189,423
(226,537)
Add: Depreciation, depletion and amortization
167,046
177,875
191,189
Add: Interest expense, net
67,632
68,062
50,585
Add: Other foreign exchange (gains) losses
(32,259)
7,049
1,175
Add: Loss on debt extinguishment
5,336
8,477
—
Add: Income tax expense (benefit)
231,574
53,102
(60,016)
Add: Impairment of assets
—
—
78,111
Add: Restructuring costs
—
2,300
—
Add: Losses on idled assets held for sale
771
2,732
9,994
Add: Gain on disposal of asset held for sale
—
(14,845)
—
Add: Increase (decrease) in provision for discounting
and credit losses
3,821
(8,042)
9,298
Adjusted EBITDA
1,215,624
486,133
53,799
Liquidity and Capital Resources
Overview
Our objective is to maintain a prudent capital structure and to ensure that sufficient liquid assets and funding are
available to meet both anticipated and
 
unanticipated financial obligations, including unforeseen events that could
have an
 
adverse impact
 
on revenues
 
or costs.
 
Our principal
 
sources of
 
funds are
 
cash and
 
cash equivalents,
cash flow from operations and availability under the ABL
 
Facility.
Our main uses of cash have historically been, and are expected to continue to be, the funding of our operations,
working capital,
 
capital
 
expenditure,
 
debt
 
service
 
obligations,
 
business
 
or assets
 
acquisitions
 
and
 
payment
 
of
dividends. Based on our outlook for the next
 
twelve months and beyond,
 
which is subject to continually changing
demand from our customers, volatility in
 
coal prices, ongoing interruptions and uncertainties surrounding China’s
import restrictions,
 
such as
 
trade barriers
 
imposed by
 
China on
 
Australian sourced
 
coal and
 
the uncertainty
 
of
impacts from the Russia and Ukraine war
 
on the global supply chain, we believe
 
expected cash generated from
operations together with available borrowing facilities
 
and other strategic and financial
 
initiatives, will be sufficient
to meet
 
the needs
 
of our
 
existing operations,
 
capital expenditure,
 
service our
 
debt obligations
 
and, if
 
declared,
payment of dividends.
Our ability to generate
 
sufficient cash depends
 
on our future performance
 
which may be subject
 
to a number of
factors
 
beyond
 
our
 
control,
 
including
 
general
 
economic,
 
financial
 
and
 
competitive
 
conditions
 
and
 
other
 
risks
described in Part I, Item 1A. “Risk Factors” of this Annual
 
Report on Form 10-K.
Liquidity as of December 31, 2022 and December 31,
 
2021 was as follows:
December 31,
(US$ in thousands)
2022
2021
Cash, excluding restricted cash
334,378
437,679
Availability under ABL Facility
(1)
100,000
100,000
Total
434,378
537,679
(1)
 
The ABL Facility contains a
 
springing fixed charge coverage
 
ratio of not less than 1.00
 
to 1.00, which ratio is tested
 
if availability under the
ABL Facility is less than $17.5 million for five consecutive
 
business days or less than $15.0 million on
 
any business day.
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
109
Our total indebtedness as of December 31, 2022 and
 
December 31, 2021 consisted of the following:
(US$ in thousands)
2022
2021
Interest bearing liabilities, excluding current installments
242,326
315,000
Current installments of other financial liabilities and finance
 
lease obligations
4,585
8,634
Other financial liabilities and finance lease obligations, excluding current
installments
8,336
14,031
Total
255,247
337,665
Liquidity
As
 
of
 
December
 
31,
 
2022,
 
available
 
liquidity
 
was
 
$434.4
 
million,
 
comprising
 
of
 
cash
 
and
 
cash
 
equivalents
(excluding restricted cash) of $334.4 million and $100.0
 
million of available borrowings under our ABL Facility.
Coronado continues to actively
 
review plans for reducing
 
operating, corporate and capital
 
expenditures to ensure
sufficient available liquidity during periods of uncertainty
 
and volatility.
Cash
Cash is held in a
 
multicurrency interest bearing bank accounts available to be
 
used to service the working capital
needs of
 
the Company.
 
Cash balances
 
surplus to
 
immediate working
 
capital requirements
 
is invested
 
in short-
term interest-bearing deposit accounts or used to repay
 
interest bearing liabilities.
Senior Secured Notes
As of December 31, 2022, the outstanding principal amount of our 10.750%
 
Senior Secured Notes due 2026, or
the Notes,
 
was $242.3
million. Interest on
 
the Notes is
 
payable semi-annually in
 
arrears on
 
May 15 and
 
November
15 of each year. The Notes
 
mature on May 15, 2026 and are senior secured obligations
 
of the Company.
The Notes are guaranteed
 
on a senior secured
 
basis by the Company
 
and its wholly-owned
 
subsidiaries (other
than
 
the
 
Issuer)
 
(subject
 
to
 
certain
 
exceptions
 
and
 
permitted
 
liens)
 
and
 
secured
 
by
 
(i)
 
a
 
first-priority
 
lien
 
on
substantially all of the Company’s assets and the assets of the other
 
Guarantors (other than accounts receivable
and other rights to payment,
 
inventory,
 
intercompany indebtedness, certain
 
general intangibles and commercial
tort claims, commodities accounts, deposit accounts, securities accounts and other related assets and proceeds
and
 
products
 
of
 
each
 
of
 
the
 
foregoing,
 
or,
 
collectively,
 
the
 
ABL
 
Collateral),
 
or
 
the
 
Notes
 
Collateral,
 
and
 
(ii)
 
a
second-priority lien on the ABL Collateral, which is
 
junior to a first-priority lien, for the
 
benefit of the lenders under
the ABL Facility.
The terms
 
of the
 
Notes are
 
governed
 
by the
 
indenture.
 
The indenture
 
contains
 
customary
 
covenants
 
for high
yield bonds, including,
 
but not limited
 
to, limitations on
 
investments, liens, indebtedness,
 
asset sales, transactions
with affiliates and restricted payments, including payment
 
of dividends on capital stock.
The Company may
 
redeem some or
 
all of the
 
Notes at the
 
redemption prices and
 
on the terms
 
specified in the
Indenture. In addition, the Company may,
 
from time to time, seek to retire or purchase outstanding
 
debt through
open-market purchases,
 
privately negotiated
 
transactions or
 
otherwise. Such
 
repurchases, if
 
any,
 
will be
 
upon
such terms and at such prices as the Company may determine, and will depend on prevailing market conditions,
liquidity requirements, contractual restrictions and other
 
factors.
As of December 31, 2022, we were in compliance with all applicable
 
covenants under the Indenture.
Partial Redemption of Notes
On November
 
23, 2022,
 
the Company
 
exercised its
 
optional redemption
 
rights and
 
redeemed $35.0
 
million, or
10.0%, of the
 
original aggregate principal amount
 
of its Notes
 
at a redemption
 
price equal to
 
103% of the
 
principal
amount of the Notes, plus accrued and unpaid interest on
 
the Notes to, but not including, the date
 
of redemption.
For
 
the
 
year
 
ended
 
December
 
31,
 
2022,
 
in
 
connection
 
with
 
the
 
dividends
 
paid
 
in
 
the
 
period,
 
we
 
offered
 
to
purchase the
 
Notes pursuant
 
to the
 
terms of
 
the Indenture.
 
In connection
 
with the
 
above offers,
 
we purchased
an
 
aggregate
 
principal
 
amount,
 
for
 
accepted
 
offers,
 
of
 
$37.7
 
million
 
at
 
a
 
price
 
equal
 
to
 
104%
 
of
 
the
 
principal
amount of the Notes, plus accrued and unpaid interest on
 
the Notes to, but not including, the date
 
of redemption.
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
110
ABL Facility
The ABL
 
Facility,
 
dated May
 
12, 2021,
 
is for
 
an aggregate
 
multi-currency
 
lender commitment
 
of up
 
to $100.0
million, including a $30.0 million
 
sublimit for the issuance
 
of letters of credit and
 
$5.0 million for swingline
 
loans,
at any time outstanding, subject to borrowing base availability.
 
The ABL Facility matures on May 12, 2024.
Borrowings under the ABL Facility bear interest at a rate
 
equal to a BBSY rate plus an applicable margin.
As
 
at
 
December
 
31,
 
2022,
 
no
 
amounts
 
were
 
drawn
 
and
 
no
 
letters
 
of
 
credit
 
were
 
outstanding
 
under
 
the
 
ABL
Facility.
As of December 31, 2022, we were in compliance with all applicable
 
covenants under the ABL Facility.
Bank Guarantees and Surety Bonds
We
 
are
 
required
 
to
 
provide
 
financial
 
assurances
 
and
 
securities
 
to
 
satisfy
 
contractual
 
and
 
other
 
requirements
generated in the
 
normal course of
 
business. Some of
 
these assurances are provided
 
to comply with
 
state or other
government agencies’ statutes and regulations.
For the U.S. Operations, in
 
order to provide the required
 
financial assurance, we generally use
 
surety bonds for
post-mining reclamation.
 
We can
 
also use
 
bank letters
 
of credit
 
to collateralize
 
certain other
 
obligations. As
 
of
December 31, 2022, we
 
had outstanding surety bonds of
 
$34.9 million and letters of
 
credit of $16.8 million issued
from our available bank guarantees, to meet contractual obligations under workers compensation insurance and
to secure
 
various
 
obligations
 
and commitments.
 
Future
 
regulatory
 
changes relating
 
to these
 
obligations
 
could
result in increased obligations, additional costs or additional
 
collateral requirements.
For
 
the
 
Australian
 
Operations,
 
we
 
had
 
bank
 
guarantees
 
outstanding
 
of
 
$27.3
 
million
 
at
 
December
 
31,
 
2022,
primarily in respect of certain rail and port arrangements
 
of the Company.
As of
 
December 31,
 
2022, we
 
had outstanding
 
bank guarantees
 
of $44.1
 
million to
 
secure various
 
obligations
and
 
commitments.
 
The
 
Company
 
provided
 
cash,
 
in
 
the
 
form
 
of
 
deposits,
 
as
 
collateral
 
against
 
these
 
bank
guarantees.
Dividend
During the year ended December 31, 2022, we paid $700.2
 
million in dividends to stockholders or CDI holders
on the ASX,
 
net of $1.4 million foreign exchange gain on payment
 
of dividends to certain CDI holders that
elected to be paid in Australian dollars.
On February 21,
 
2023, our Board
 
of Directors declared
 
a bi-annual fully
 
franked fixed ordinary
 
dividend of $8.4
million, or 0.5 cents per CDI. The Company
 
is not required to make an offer
 
to purchase Notes in relation to this
dividend due to the available unaccepted portion of the
 
offer to purchase Notes made in connection with
 
special
dividends declared on October 30, 2022. The dividend will have a record date of March 15, 2023, Australia time,
and be payable on April 5, 2023, Australia time. The
 
ordinary dividend will be funded from available cash.
 
Capital Requirements
Our main uses of cash have historically been the funding
 
of our operations, working capital, capital expenditure,
the payment of
 
interest and dividends.
 
We intend
 
to use cash
 
to fund debt
 
service payments
 
on our Notes,
 
the
ABL Facility and our
 
other indebtedness, to fund operating
 
activities, working capital, capital expenditures, partial
redemption of the Notes, business or assets acquisitions
 
and, if declared, payment of dividends.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
111
Historical Cash Flows
The
 
following
 
table
 
summarizes
 
our
 
cash
 
flows
 
for
 
the
 
year
 
ended
 
December
 
31,
 
2022,
 
2021
 
and
 
2020
 
as
reported in the accompanying Consolidated Financial Statements:
Cash Flow
For Year Ended December 31,
(US$ in thousands)
2022
2021
2020
Net cash provided by (used in) operating activities
926,643
442,014
(3,000)
Net cash used in investing activities
(208,343)
(134,332)
(114,128)
Net cash (used in) provided by financing activities
(784,251)
80,836
137,526
Net change in cash and cash equivalents
(65,951)
388,518
20,398
Effect of exchange rate changes on cash and restricted
 
cash
(37,351)
3,677
(1,215)
Cash and restricted cash at beginning of period
437,931
45,736
26,553
Cash and restricted cash at end of period
334,629
437,931
45,736
Operating activities
Net cash provided
 
by operating activities
 
was $926.6 million
 
for the year ended
 
December 31, 2022,
 
compared
to a
 
cash provided
 
by in
 
operating activities
 
of $442.0 million for
 
the year
 
ended December
 
31, 2021.
 
The increase
was primarily driven by higher coal revenues due to an increase in the
 
average realized Met coal pricing partially
offset by higher operating
 
costs and unfavorable working capital
 
movement due to higher trade
 
receivables and
inventories at December 31, 2022.
Net cash provided
 
by operating activities
 
was $442.0 million
 
for the year ended
 
December 31, 2021,
 
compared
to a cash used in
 
operating activities of $3.0 million for the year
 
ended December 31, 2020. The increase in cash
provided by
 
operating
 
activities
 
was driven
 
by favorable
 
movement
 
in working
 
capital and
 
an increase
 
in coal
revenues during the year partially offset by higher
 
operating costs.
Investing activities
Net cash
 
used in
 
investing activities
 
was
 
$208.3 million
 
for the
 
year
 
ended December
 
31, 2022,
 
compared
 
to
$134.3 million
 
for the
 
year ended
 
December 31,
 
2021. Cash
 
spent on
 
capital expenditures
 
for the
 
year ended
December 31,
 
2022
 
was $199.7
 
million, of
 
which $79.
 
4
 
million is
 
related to
 
the Australian
 
Operations,
 
$119.7
million is related
 
to the U.S.
 
Operations and the
 
remaining $0.6 million
 
for other and corporate.
 
During the year
ended December
 
31, 2022,
 
a net
 
of $6.5
 
million of
 
additional deposits
 
were provided
 
as collateral
 
for our
 
U.S.
workers
 
compensation
 
obligations
 
and
 
$2.4
 
million
 
of
 
the
 
additional
 
security
 
deposit
 
were
 
provided
 
by
 
our
Australian Operations to satisfy contractual requirements in
 
the normal course of business.
Net cash
 
used in
 
investing
 
activities was
 
$134.3 million
 
for the
 
year
 
ended December
 
31, 2021,
 
compared
 
to
$114.1
 
million for
 
the year
 
ended December
 
31, 2020.
 
Cash spent
 
on capital
 
expenditures for
 
the year
 
ended
December 31, 2021 was
 
$89.7 million, of
 
which $37.9 million is
 
related to the Australian
 
Operations, $50.1 million
related to
 
the
 
U.S.
 
Operations
 
and the
 
remaining
 
$1.6
 
million for
 
other
 
and corporate.
 
During
 
the
 
year
 
ended
December 31, 2021, a net of $73.7 million of additional deposits were provided as collateral for bank guarantees
and our
 
U.S. workers
 
compensation obligations.
 
Partially offsetting
 
the cash
 
used, was
 
net proceeds
 
of $27.5
million generated during the year ended December 31, 2021
 
from the sale of Amonate.
Financing activities
Net cash
 
used in
 
financing
 
activities was
 
$784.3 million
 
for the
 
year ended
 
December
 
31, 2022,
 
compared
 
to
cash provided by financing activities of
 
$80.8 million for the year ended December
 
31, 2021. The net cash used
in financing activities for
 
the year ended December
 
31, 2022, included dividend
 
payments of $700.2
million, net
of a
 
$1.4 million
 
foreign exchange
 
gain on
 
settlement
 
of dividends
 
for shareholders
 
who elected
 
to be
 
paid
 
in
Australian dollars
 
,
 
$72.7 million
 
of Notes
 
redeemed
 
and
 
$2.6 million
 
of premium
 
paid on
 
redemption,
 
and the
remainder related to repayment of other financial liabilities.
Net cash provided by financing activities was $80.8
 
million for the year ended December 31, 2021, compared
 
to
$137.5 million
 
for the year
 
ended December
 
31, 2021.
 
Included in the
 
net cash
 
provided by
 
financing activities
for
 
the
 
year
 
ended
 
December
 
31,
 
2021,
 
were
 
net
 
proceeds
 
from
 
borrowings
 
of
 
$396.3
 
million,
 
repayment
 
of
borrowings of $413.2 million and net proceeds from the stock
 
issuance of $97.7 million.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
112
Contractual Obligations
The following is a summary of our contractual obligations
 
at December 31, 2022:
Payments Due By Year
Less than
1
‑
 
3
3
‑
 
5
More than
(US$ in thousands)
Total
1 Year
Years
Years
5 Years
Long
‑
term debt obligations
(1)
12,964
4,543
8,421
—
—
Senior secured notes
(2)
242,326
—
—
242,326
—
Mineral lease commitments
(3)
52,742
5,493
10,623
10,228
26,398
Operating and finance lease commitments
27,099
9,102
11,644
6,353
—
Unconditional purchase obligations
(4)
28,601
28,601
—
—
—
Take
‑
or
‑
pay contracts
(5)
932,701
96,734
203,116
206,564
426,287
Total
 
contractual cash obligations
1,296,433
144,473
233,804
465,471
452,685
(1)
 
Represents financial obligation relating to amounts outstanding
 
from financing equipment purchases,
insurance premiums and financial liabilities for a sale and lease
 
back type arrangement.
(2)
 
Represents financial obligation outstanding under the
 
Senior Secured Notes. Refer to 17 “Interest
Bearing Liabilities”
 
in the accompanying audited Consolidated Financial Statements
 
for additional
discussion.
(3)
 
Represents future minimum royalties and payments under mineral
 
leases. Refer to 27 “Commitments”
in the accompanying audited Consolidated Financial Statements
 
for additional discussion.
(4)
 
Represents firm purchase commitments for capital expenditures
 
(based on order to suppliers for capital
purchases) for 2023.
(5)
 
Represents various short-
 
and long-term take-or-pay arrangements in Australia associated
 
with rail and
port commitments for the delivery of coal.
This
 
table
 
does
 
not
 
include
 
our
 
estimated
 
Asset
 
Retirement
 
Obligations,
 
or
 
ARO.
 
As
 
discussed
 
in
 
“—Critical
Accounting
 
Policies
 
and
 
Estimates—Carrying
 
Value
 
of
 
Asset
 
Retirement
 
Obligations”
 
below,
 
the
 
current
 
and
non-current
 
carrying
 
amount
 
of
 
our
 
ARO
 
involves
 
several
 
estimates,
 
including
 
the
 
amount
 
and
 
timing
 
of
 
the
payments required to satisfy
 
these obligations. The timing
 
of payments is based on numerous
 
factors, including
projected
 
mine
 
closure
 
dates.
 
Based
 
on
 
our
 
assumptions,
 
the
 
carrying
 
amount
 
of
 
our
 
ARO
 
as
 
determined
 
in
accordance with U.S. GAAP was $138.5 million as of
 
December 31, 2022.
Critical Accounting Policies and Estimates
The preparation
 
of
 
our Consolidated
 
Financial
 
Statements
 
in conformity
 
with
 
U.S. GAAP
 
requires
 
us
 
to
 
make
estimates
 
and
 
assumptions
 
that
 
affect
 
the
 
reported
 
amounts
 
of
 
assets
 
and
 
liabilities
 
at
 
the
 
date
 
of
 
the
Consolidated
 
Financial
 
Statements
 
and
 
the
 
reported
 
amounts
 
of
 
revenue
 
and
 
expenses
 
during
 
the
 
reporting
period.
 
Listed
 
below
 
are
 
the
 
accounting
 
estimates
 
that
 
we
 
believe
 
are
 
critical
 
to
 
our
 
Consolidated
 
Financial
Statements due to the degree of
 
uncertainty regarding the estimates or assumptions involved and
 
the magnitude
of the asset, liability, revenue or expense being reported. All of these accounting
 
estimates and assumptions, as
well
 
as
 
the
 
resulting
 
impact
 
to
 
our
 
Consolidated
 
Financial
 
Statements,
 
have
 
been
 
discussed
 
with
 
the
 
Audit,
Governance and Risk Committee, or Audit Committee,
 
of our Board of Directors.
See Note 2.
 
“Summary of Significant
 
Accounting Policies”
 
to the accompanying
 
audited Consolidated Financial
Statements for a summary of our significant accounting
 
policies.
Fair Value of Non-Financial Assets
Our
 
non-financial
 
assets
 
valuations
 
are
 
primarily
 
comprised
 
of
 
our
 
determination
 
of
 
the
 
estimated
 
fair
 
value
allocation of net tangible
 
and intangible assets, our
 
annual assessment of
 
the recoverability of
 
our goodwill and
our evaluation of the recoverability of our other long-lived
 
assets upon certain triggering events.
Long-Lived Assets
We review
 
the carrying
 
value of
 
intangible
 
assets with
 
definite lives
 
and
 
other long-lived
 
assets to
 
be used
 
in
operations annually
 
or whenever
 
events or
 
changes in
 
circumstances
 
indicate that
 
the carrying
 
amount of
 
the
assets or asset groups might not be recoverable.
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
113
Factors that would necessitate
 
an impairment assessment
 
include a significant adverse
 
change in the extent
 
or
manner in which an asset is
 
used, a significant adverse change in
 
legal factors or the business climate
 
that could
affect
 
the
 
value
 
of
 
the
 
asset
 
group
 
or
 
a significant
 
decline
 
in
 
the
 
observable
 
market
 
value
 
of
 
an
 
asset
 
group,
among others. If such facts
 
indicate a potential impairment,
 
the recoverability of the asset
 
group is assessed by
determining whether the carrying value
 
of the asset group exceeds
 
the sum of the projected
 
undiscounted cash
flows expected to
 
result from
 
the use and
 
eventual disposition
 
of the asset
 
group over the
 
remaining economic
life of the asset
 
group. If the projected undiscounted cash
 
flows are less than
 
the carrying amount, an impairment
is recorded
 
for the
 
excess of
 
the carrying
 
amount over
 
the estimated
 
fair value,
 
which is
 
generally determined
using discounted future cash
 
flows. Any such write
 
down is included in
 
impairment expense in our
 
consolidated
statement of operations.
A high degree of
 
judgment is required
 
to estimate the
 
fair value of
 
our intangible and
 
long-lived assets, and
 
the
conclusions that
 
we reach
 
could vary
 
significantly based
 
on these
 
judgments.
 
We make
 
various
 
assumptions,
including assumptions regarding
 
future cash flows
 
in our
 
assessments of
 
fair value. The
 
assumptions about future
cash
 
flows
 
and
 
growth
 
rates
 
are
 
based
 
on
 
the
 
current
 
and
 
long-term
 
business
 
plans
 
related
 
to
 
the
 
long-lived
assets. Discount
 
rate assumptions
 
are based
 
on an
 
assessment of
 
the risk
 
inherent in
 
the future
 
cash flows
 
of
the long-lived assets.
At
 
December
 
31,
 
2022,
 
we
 
determined,
 
based
 
on
 
our
 
qualitative
 
assessment,
 
that
 
no
 
impairment
 
indicators
existed.
Goodwill Impairment
We had
 
a balance
 
of goodwill
 
of $28.0 million
 
recorded at
 
December 31,
 
2022, which
 
was generated
 
upon the
acquisition of Buchanan
 
in 2016. We
 
perform our annual assessment
 
of the recoverability of
 
our goodwill in
 
the
fourth quarter of each year. We utilize a qualitative assessment for determining whether the quantitative goodwill
impairment analysis is
 
necessary.
 
The accounting guidance
 
permits entities to
 
first assess qualitative
 
factors to
determine whether it is more
 
likely than not that the
 
fair value of a reporting
 
unit is less than its carrying
 
amount
as
 
a
 
basis
 
for
 
determining
 
whether
 
it
 
is
 
necessary
 
to
 
perform
 
the
 
quantitative
 
goodwill
 
impairment
 
test.
 
In
evaluating goodwill on
 
a qualitative basis,
 
we review the
 
business performance
 
of the Buchanan
 
mine complex
(the only reporting
 
unit with
 
a goodwill balance)
 
and evaluate
 
other relevant
 
factors as
 
identified in the
 
relevant
accounting
 
guidance
 
to
 
determine
 
whether
 
it
 
is
 
more
 
likely
 
than
 
not
 
that
 
an
 
indicator
 
of
 
impairment
 
exists
 
at
Buchanan. We consider whether there are any negative macroeconomic conditions, industry specific conditions,
market
 
changes,
 
increased
 
competition,
 
increased
 
costs
 
in
 
doing
 
business,
 
management
 
challenges,
 
legal
environments and how these factors might
 
impact company specific performance in future periods.
 
As part of the
analysis, we
 
also consider
 
fair value
 
determinations for
 
certain reporting
 
units that
 
have been
 
made at
 
various
points throughout
 
the current
 
and prior
 
year for
 
other purposes
 
to ensure
 
there is
 
no contrary
 
evidence to
 
our
analysis. At
 
December 31,
 
2022, we
 
did not
 
perform a
 
quantitative impairment
 
assessment as
 
we determined,
based on our qualitative assessment, that no impairment
 
indicators existed.
Assets held for sale
As of December 31, 2022, the assets
 
and liabilities held for sale represent the fair value
 
of the Greenbrier mining
asset, which may be realized through a potential sale within the
 
next 12 months.
The fair value of the Greenbrier mining asset was primarily driven by indicative offers and Level 3 inputs such as
estimates
 
of
 
future
 
cash
 
flows
 
which
 
aligns
 
to
 
the
 
Company’s
 
best
 
estimate
 
of
 
future
 
market
 
and
 
operating
conditions, including
 
its current
 
life of
 
mine plan.
 
The life
 
of mine
 
plan includes
 
assumptions in
 
relation to
 
coal
price forecasts, projected mine production volumes, operating costs,
 
capital costs and discount rate.
Carrying Value of Asset Retirement
 
Obligations
The Company is required to maintain a liability
 
(and associated asset) for the expected value of future
 
retirement
obligations on their mines, in line with ASC 410, Asset
 
Retirement and Environmental Obligations.
Reclamation
 
of
 
areas
 
disturbed
 
by
 
mining
 
operations
 
must
 
be
 
performed
 
by
 
us
 
in
 
accordance
 
with
 
approved
reclamation plans and in compliance with state and federal laws in the states of West Virginia and Virginia
 
in the
U.S., and Queensland in Australia. For areas disturbed, a significant amount of the reclamation will take place in
the future, when
 
operations cease. There
 
were no assets
 
that were
 
legally restricted for
 
purposes of settling
 
asset
retirement obligations
 
as of
 
December 31,
 
2022. In
 
addition, state
 
agencies monitor
 
compliance with
 
the mine
plans, including reclamation.
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
114
We
 
record
 
the
 
fair
 
value
 
of
 
additions
 
to
 
our
 
asset
 
retirement
 
obligations
 
using
 
the
 
present
 
value
 
of
 
projected
future
 
cash
 
flows
 
discounted
 
using
 
a
 
credit-adjusted
 
risk-free
 
rate,
 
with
 
an
 
equivalent
 
amount
 
recorded
 
as
 
a
long-lived asset. An accretion
 
cost is recorded each
 
period and the capitalized cost
 
is depreciated over the
 
useful
life of the
 
related asset. As reclamation
 
work is performed or
 
liabilities are otherwise settled, the
 
recorded amount
of the liability is reduced.
A review
 
of restoration
 
and
 
decommissioning
 
provisions
 
is carried
 
out annually
 
on a
 
mine-by-mine
 
basis,
 
and
adjustments are made to reflect any changes in estimates, if necessary. On an interim basis, we may update the
liability based on significant changes to the life of mine or significant increases in disturbances during the period.
Expected Credit Losses
For trade and related party
 
receivables carried at amortized
 
cost, we determine expected
 
credit losses, or ECL,
on a forward-looking basis. The amount of ECL is updated at each reporting date to reflect changes in credit risk
since the
 
initial recognition of
 
the respective
 
financial instrument. We
 
recognize the lifetime
 
ECL. ECL is
 
estimated
based on our
 
historic credit loss
 
experience, adjusted for
 
factors that are
 
specific to the
 
financial asset, general
economic
 
conditions,
 
financial
 
asset
 
type,
 
term
 
and
 
an
 
assessment
 
of
 
both
 
the
 
current
 
as
 
well
 
as
 
forecast
conditions, including
 
the expected
 
timing of
 
collection, at
 
the reporting
 
date, modified
 
for credit
 
enhancements
such
 
as
 
letters
 
of
 
credit
 
obtained.
 
To
 
measure
 
ECL,
 
trade
 
and
 
related
 
party
 
receivables
 
have
 
been
 
grouped
based on shared credit risk characteristics and the days
 
past due.
We consider
 
an event
 
of default
 
has occurred
 
when
 
a financial
 
asset is
 
significantly
 
past due
 
or other
 
factors
indicate that the debtor
 
is unlikely to pay
 
amounts owed to us.
 
A financial asset is
 
credit impaired when there
 
is
evidence that the counterparty
 
is in significant financial
 
difficulty or a
 
breach of contract, such
 
as default or past
due event
 
has occurred.
 
We write
 
off a
 
financial asset
 
when there
 
is information
 
indicating there
 
is no
 
realistic
prospect of recovery of the asset
 
from the counterparty.
 
The amount of the impairment
 
loss is recognized in the
consolidated statement of operations
 
and other comprehensive income
 
within “Decrease (increase) in provision
for discounting
 
and
 
credit
 
losses”.
 
Subsequent
 
recoveries
 
of
 
amounts
 
previously
 
written
 
off
 
are credit
 
against
“Decrease (increase) provision for discounting and
 
credit losses” in the
 
consolidated statement of operations and
other comprehensive income.
Recoverable Coal Reserves
There are numerous uncertainties inherent
 
in estimating quantities and values of
 
economically recoverable coal
reserves,
 
including
 
many
 
factors
 
beyond
 
our
 
control.
 
As
 
a
 
result,
 
estimates
 
of
 
economically
 
recoverable
 
coal
reserves
 
are
 
by
 
their
 
nature
 
uncertain.
 
Information
 
about
 
our
 
reserves
 
consists
 
of
 
estimates
 
based
 
on
engineering,
 
economic
 
and
 
geological
 
data
 
assembled
 
and
 
analyzed
 
by
 
our
 
staff
 
and
 
third-party
 
qualified
persons. Our
 
reserves are
 
periodically reviewed
 
by an
 
independent third
 
party consultant.
 
Some of
 
the factors
and assumptions which impact economically recoverable reserve
 
estimates include:
•
 
geological settings;
•
 
historical production from the area compared with production from
 
other producing areas;
•
 
the assumed effects of regulations and taxes by governmental
 
agencies
;
•
 
assumptions governing future prices; and
•
 
future operating costs.
Each of these factors may in fact vary considerably from the
 
assumptions used in estimating reserves. For these
reasons,
 
estimates
 
of
 
the
 
economically
 
recoverable
 
quantities
 
of
 
coal
 
attributable
 
to
 
a
 
particular
 
group
 
of
properties, and classifications
 
of these reserves
 
based on the
 
risk of recovery
 
and estimates of
 
future net cash
flows,
 
may
 
vary
 
substantially.
 
Actual
 
production,
 
revenues
 
and
 
expenditures
 
with
 
respect
 
to
 
our
 
reserves
 
will
likely
 
vary
 
from
 
estimates,
 
and
 
these
 
variances
 
may
 
be
 
material.
 
See
 
Item 1A.
 
“Risk
 
Factors—We
 
rely
 
on
estimates of our
 
recoverable reserves,
 
which is complex
 
due to geological
 
characteristics of the
 
properties and
the number of assumptions made”
 
and Item 2. “Properties” for discussions
 
of the uncertainties in estimating
 
our
proven and probable coal reserves.
Taxes
We are required to
 
estimate the amount of
 
tax payable or
 
refundable for the
 
current year and the
 
deferred income
tax liabilities and assets
 
for the future tax consequences
 
of events that have
 
been reflected in our
 
Consolidated
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
115
Financial Statements
 
or tax
 
returns for
 
each taxing
 
jurisdiction in
 
which we
 
operate. This
 
process requires
 
our
management to
 
make judgments
 
regarding the
 
timing and
 
probability of
 
the ultimate
 
tax impact
 
of the
 
various
agreements
 
and
 
transactions
 
that
 
we
 
enter
 
into.
 
Based
 
on
 
these
 
judgments
 
we
 
may
 
record
 
tax
 
reserves
 
or
adjustments
 
to
 
valuation
 
allowances
 
on
 
deferred
 
tax
 
assets
 
to
 
reflect
 
the
 
expected
 
realizability
 
of
 
future
 
tax
benefits. Actual income
 
taxes could vary
 
from these estimates
 
due to
 
future changes in
 
income tax
 
law, significant
changes
 
in
 
the
 
jurisdictions
 
in
 
which
 
we
 
operate,
 
our
 
inability
 
to
 
generate
 
sufficient
 
future
 
taxable
 
income
 
or
unpredicted results from the final
 
determination of each year’s
 
liability by taxing authorities. These
 
changes could
have a significant impact on our financial position.
Newly Adopted Accounting Standards and Accounting
 
Standards Not Yet Implemented
See Note 2. “Summary
 
of Significant Accounting
 
Policies” to the
 
accompanying audited
 
Consolidated Financial
Statements
 
for
 
a
 
discussion
 
of
 
newly
 
adopted
 
accounting
 
standards
 
and
 
accounting
 
standards
 
not
 
yet
implemented.
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
116
ITEM 7A.
 
QUANTITATIVE
 
AND QUALITATIVE
 
DISCLOSURES ABOUT MARKET RISK
Our activities
 
expose us
 
to
 
a variety
 
of financial
 
risks, such
 
as commodity
 
price risk,
 
interest rate
 
risk, foreign
currency risk, liquidity risk and credit
 
risk. The overall risk management objective is
 
to minimize potential adverse
effects on our financial performance from those risks
 
which are not coal price related.
We manage
 
financial risk
 
through policies
 
and procedures
 
approved by
 
our Board
 
of Directors.
 
These specify
the responsibility
 
of the
 
Board
 
of Directors
 
and
 
management
 
with regard
 
to the
 
management
 
of financial
 
risk.
Financial risks are
 
managed centrally by
 
our finance
 
team under the
 
direction of the
 
Group Chief
 
Financial Officer.
The finance team manages risk exposures primarily through delegated authority limits approved by the Board of
Directors. The finance team regularly monitors our
 
exposure to these financial risks and reports
 
to management
and
 
the
 
Board
 
of
 
Directors
 
on
 
a
 
regular
 
basis.
 
Policies
 
are
 
reviewed
 
at
 
least
 
annually
 
and
 
amended
 
where
appropriate.
We may use
 
derivative financial instruments such
 
as forward fixed
 
price commodity contracts, interest
 
rate swaps
and
 
foreign
 
exchange
 
rate
 
contracts
 
to
 
hedge
 
certain
 
risk
 
exposures.
 
Derivatives
 
for
 
speculative
 
purposes
 
is
strictly prohibited by the Treasury Risk Management Policy approved by our Board of
 
Directors. We use different
methods
 
to
 
measure
 
the
 
extent
 
to
 
which
 
we
 
are
 
exposed
 
to
 
various
 
financial
 
risks.
 
These
 
methods
 
include
sensitivity analysis in
 
the case of
 
interest rate, foreign
 
exchange and other
 
price risks and
 
aging analysis for
 
credit
risk.
Commodity Price Risk
Coal Price Risk
We
 
are
 
exposed
 
to
 
domestic
 
and
 
global
 
coal
 
prices.
 
Our
 
principal
 
philosophy
 
is
 
that
 
our
 
investors
 
would
 
not
consider
 
hedging
 
of
 
coal
 
prices
 
to
 
be
 
in
 
the
 
long-term
 
interest
 
of
 
our
 
stockholders.
 
Therefore,
 
any
 
potential
hedging of coal prices through long-term fixed price contracts is subject to the approval of our Board of Directors
and would only be adopted in exceptional circumstances.
The
 
expectation
 
of
 
future
 
prices
 
for
 
coal
 
depends
 
upon
 
many
 
factors
 
beyond
 
our
 
control.
 
Met
 
coal
 
has
 
been
volatile commodity
 
over the
 
past ten
 
years. Recently,
 
in the
 
second quarter
 
of 2022,
 
seaborne prices
 
reached
record levels with both the Australian and U.S. Met coal price indices exceeding $600 per Mt, largely as result of
supply concerns
 
in key
 
Met coal
 
markets and
 
continued trade
 
flow disruptions
 
caused by
 
geopolitical tensions
following Russian
 
invasion
 
of Ukraine.
 
The demand
 
and supply
 
in the
 
Met coal
 
industry changes
 
from time
 
to
time. There are no assurances that oversupply will not occur, that demand will not decrease or that overcapacity
will not
 
occur,
 
which could
 
cause declines
 
in the
 
prices of
 
coal, which
 
could have
 
a material
 
adverse effect
 
on
our financial condition and results of operations
Additionally,
 
access to
 
international markets
 
may be
 
subject to
 
ongoing interruptions
 
and trade
 
barriers due
 
to
policies and tariffs of individual countries. For example, the imposition of restrictions
 
by China on Australian coal
into the
 
Country,
 
may in
 
the future
 
have a
 
negative impact
 
on our
 
profitability.
 
We may
 
or may
 
not be
 
able to
access alternate
 
markets for
 
our coal
 
should additional
 
interruptions and
 
trade barriers
 
occur in
 
the future.
 
An
inability
 
for
 
Met
 
coal
 
suppliers
 
to
 
access
 
international
 
markets,
 
including
 
China,
 
would
 
likely
 
result
 
in
 
an
oversupply of Met coal and may result in a decrease in
 
prices and or the curtailment of production.
We manage
 
our commodity
 
price risk
 
for our non-trading,
 
thermal coal
 
sales through
 
the use
 
of long-term
 
coal
supply agreements in our
 
U.S. Operations. In Australia, thermal
 
coal is sold
 
to Stanwell on a
 
supply contract. See
Part I, Item 1A. “Risk Factors—Risks related to the Supply Deed with Stanwell may
 
adversely affect our financial
condition and results of operations.”
Sales commitments in the
 
Met coal market are typically
 
not long-term in nature,
 
and we are therefore subject
 
to
fluctuations
 
in
 
market
 
pricing.
 
Certain
 
coal
 
sales
 
in
 
our
 
Australian
 
Operations
 
are
 
provisionally
 
priced
 
initially.
Provisionally priced sales
 
are those for
 
which price
 
finalization, referenced
 
to the relevant
 
index, is outstanding
at the reporting date. The final sales price is
 
determined within 7 to 90 days after delivery
 
to the customer.
 
As of
December 31, 2022,
 
we had $13.7
 
million of outstanding
 
provisionally priced receivables
 
subject to changes
 
in
the relevant price index. If prices decreased 10%, these provisionally priced receivables would decrease by $1.4
million.
 
See Part
 
I, Item
 
1A.
 
“Risk
 
Factors—Our
 
profitability depends
 
upon the
 
prices
 
we receive
 
for our
 
coal.
Prices for coal are volatile and can fluctuate widely based upon
 
a number of factors beyond our control.”
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
117
Diesel Fuel
We may
 
be exposed
 
to price
 
risk in
 
relation to
 
other commodities
 
from time
 
to time
 
arising from
 
raw materials
used in our operations (such as gas or
 
diesel). These commodities may be hedged through financial instruments
if the
 
exposure is
 
considered material
 
and where
 
the exposure
 
cannot be
 
mitigated through
 
fixed price
 
supply
agreements.
The fuel required for our operations in fiscal year 2023 will be purchased under fixed-price contracts or on
 
a spot
basis.
Interest Rate Risk
Interest rate risk is the risk that a change in interest rates
 
on our borrowing facilities will have an adverse impact
on financial performance, investment decisions
 
and stockholder return. Our
 
objectives in managing our exposure
to interest rates include
 
minimizing interest costs
 
in the long term,
 
providing a reliable estimate
 
of interest costs
for
 
the
 
annual
 
work
 
program
 
and
 
budget
 
and
 
ensuring
 
that
 
changes
 
in
 
interest
 
rates
 
will
 
not
 
have
 
a
 
material
impact on our financial performance.
As
 
of
 
December
 
31,
 
2022,
 
we
 
had
 
$255.2 million
 
of
 
fixed-rate
 
borrowings
 
and
 
Notes
 
and
 
there
 
were
no variable-rate borrowings outstanding.
 
We currently do not hedge against interest rate
 
fluctuations.
 
Foreign Exchange Risk
A significant portion of our
 
sales are denominated in US$.
 
Foreign exchange risk is
 
the risk that our earnings
 
or
cash flows are adversely impacted by movements in exchange
 
rates of currencies that are not in US$.
Our main exposure
 
is to the
 
A$-US$ exchange rate
 
through our Australian
 
Operations, which have
 
predominantly
A$
 
denominated
 
costs.
 
In
 
2022,
 
greater
 
than
 
60%
 
of
 
expenses
 
incurred
 
at
 
our
 
Australian
 
Operations
 
were
denominated in
 
A$. Approximately
 
40% of
 
our Australian
 
Operations’
 
purchases were
 
made with
 
reference
 
to
US$, which provides
 
a natural hedge
 
against foreign exchange
 
movements on these
 
purchases (including fuel,
several port handling charges,
 
demurrage, purchased coal
 
and some insurance
 
premiums). Appreciation of
 
the
A$ against
 
US$ will
 
increase our
 
Australian Operations’
 
US$ reported
 
cost base
 
and reduce
 
US$ reported
 
net
income. For
 
the portion
 
of US$
 
required to
 
purchase A$
 
to settle
 
our Australian
 
Operations’ operating
 
costs, a
10%
 
increase
 
in
 
the
 
A$
 
to
 
US$
 
exchange
 
rate
 
would
 
have
 
increased
 
reported
 
total
 
costs
 
and
 
expenses
 
by
approximately $99.0 million for the year ended December
 
31, 2022.
 
Under normal market conditions, we generally do not consider it necessary to hedge our
 
exposure to this foreign
exchange risk.
 
However,
 
there
 
may be
 
specific commercial
 
circumstances,
 
such
 
as the
 
hedging
 
of significant
capital
 
expenditure,
 
acquisitions,
 
disposals
 
and
 
other
 
financial
 
transactions,
 
where
 
we
 
may
 
deem
 
foreign
exchange hedging
 
as appropriate
 
and
 
where a
 
US$ contract
 
cannot
 
be negotiated
 
directly with
 
suppliers
 
and
other third parties.
 
For our Australian
 
Operations, we
 
translate all
 
monetary assets
 
and liabilities
 
at the period-end
 
exchange rate,
all non-monetary
 
assets and
 
liabilities at
 
historical
 
rates
 
and revenue
 
and expenses
 
at the
 
average exchange
rates in effect during
 
the periods. The net
 
effect of these
 
translation adjustments is
 
shown in the accompanying
Consolidated Financial Statements within components
 
of net income.
We currently do not hedge our non-US$ exposures
 
against exchange rate fluctuations.
Credit Risk
Credit risk is the risk of
 
sustaining a financial loss
 
as a result of a counterparty
 
not meeting its obligations under
a financial instrument or customer contract.
We are exposed
 
to credit risk
 
when we have financial
 
derivatives, cash deposits,
 
lines of credit, letters
 
of credit
or bank guarantees
 
in place with
 
financial institutions. To mitigate against credit risk
 
from financial counterparties,
we have minimum credit rating requirements with financial
 
institutions where we transact.
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
118
We
 
are
 
also
 
exposed
 
to
 
counterparty
 
credit
 
risk
 
arising
 
from
 
our
 
operating
 
activities,
 
primarily
 
from
 
trade
receivables. Customers who wish to trade on
 
credit terms are subject to credit
 
verification procedures, including
an assessment of their independent credit rating, financial position, past experience and industry reputation.
 
We
monitor the financial performance
 
of counterparties on a routine
 
basis to ensure credit
 
thresholds are achieved.
Where required, we will request additional credit
 
support, such as letters of credit,
 
to mitigate against credit risk.
Credit
 
risk
 
is
 
monitored
 
regularly,
 
and
 
performance
 
reports
 
are
 
provided
 
to
 
our
 
management
 
and
 
Board
 
of
Directors.
As of
 
December
 
31,
 
2022,
 
we had
 
financial
 
assets
 
of
 
$838.8
 
million,
 
comprising
 
of cash
 
and
 
restricted
 
cash,
trade receivables and
 
restricted deposits,
 
which are exposed
 
to counterparty
 
credit risk. These
 
financial assets
have been assessed under ASC 326, Financial Instruments – Credit Losses, and
 
a provision for discounting and
credit
 
losses
 
of
 
$5.1
 
million
 
was
 
recorded
 
as
 
of
 
December
 
31,
 
2022.
 
See
 
item
 
8.
 
Financial
 
Statements
 
and
Supplementary Data—Note 9. Provision for Discounting and
 
Credit Losses.
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
119
ITEM 8. FINANCIAL STATEMENTS
 
AND SUPPLEMENTARY
 
DATA
TABLE OF CONTENTS
Page
Number
120
121
122
123
124
 
(PCAOB ID: 0
1435
)
159
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
120
Consolidated Balance Sheets
(In US$ thousands, except share data)
Assets
Note
December 31,
2022
December 31,
2021
Current assets:
Cash and restricted cash
 
$
334,629
$
437,931
Trade receivables, net
8
 
409,979
271,923
Inventories
10
 
158,018
118,922
Other current assets
13
 
60,188
47,647
Assets held for sale
4
 
26,214
27,023
Total
 
current assets
 
989,028
903,446
Non-current assets:
Property, plant and
 
equipment, net
11
 
1,389,548
1,397,363
Right of use asset – operating leases, net
15
 
17,385
13,656
Goodwill
12
 
28,008
28,008
Intangible assets, net
12
 
3,311
3,514
Restricted deposits
28
 
89,062
80,981
Deferred income tax assets
24
 
—
14,716
Other non-current assets
13
 
33,585
19,728
Total
 
assets
 
$
2,549,927
$
2,461,412
Liabilities and Stockholders’ Equity
Current liabilities:
 
Accounts payable
 
$
61,780
$
97,514
Accrued expenses and other current liabilities
14
 
343,691
270,942
Income tax payable
24
 
119,981
25,612
Asset retirement obligations
16
 
10,646
9,414
Contract obligations
19
 
40,343
39,961
Lease liabilities
15
 
7,720
8,452
Other current financial liabilities
18
 
4,458
8,508
Liabilities held for sale
4
 
12,241
12,113
Total
 
current liabilities
 
600,860
472,516
Non-current liabilities:
Asset retirement obligations
16
 
127,844
110,863
Contract obligations
19
 
94,525
141,188
Deferred consideration liability
20
 
243,191
230,492
Interest bearing liabilities
17
 
232,953
300,169
Other financial liabilities
18
 
8,268
13,822
Lease liabilities
15
 
15,573
12,894
Deferred income tax liabilities
24
 
95,671
75,750
Other non-current liabilities
 
27,952
26,216
Total
 
liabilities
 
$
1,446,837
$
1,383,910
Common stock $
0.01
 
par value;
1,000,000,000
 
shares authorized,
167,645,373
 
shares issued and outstanding as of December 31, 2022 and
December 31, 2021
 
1,677
1,677
Series A Preferred stock $
0.01
 
par value;
100,000,000
 
shares authorized,
1
Share issued and outstanding as of December 31, 2022 and
 
December 31,
2021
—
—
Additional paid-in capital
 
1,092,282
1,089,547
Accumulated other comprehensive losses
26
 
(91,423)
(44,228)
Retained earnings
 
100,554
30,506
Total
 
stockholders’ equity
 
1,103,090
1,077,502
Total
 
liabilities and stockholders’ equity
 
$
2,549,927
$
2,461,412
See accompanying notes to consolidated financial
 
statements.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
121
Consolidated Statements of Operations and Comprehensive
 
Income
(In US$ thousands, except share data)
Year ended December 31,
Note
2022
2021
2020
Revenues:
Coal revenues
$
3,527,626
$
2,010,996
$
1,289,010
Coal revenues from related parties
29
—
97,335
134,589
Other revenues
43,916
40,140
38,663
Total
 
revenues
3
3,571,542
2,148,471
1,462,262
Costs and expenses:
Cost of coal revenues (exclusive of items shown
separately below)
1,515,585
1,195,250
1,014,879
Depreciation, depletion and amortization
167,046
177,875
191,189
Freight expenses
249,081
241,862
185,863
Stanwell rebate
165,995
55,403
103,039
Other royalties
385,065
142,751
84,891
Selling, general, and administrative expenses
 
42,499
30,666
30,352
Restructuring costs
—
2,300
—
Total
 
costs and expenses
2,525,271
1,846,107
1,610,213
Other income (expenses):
Interest expense, net
(67,632)
(68,062)
(50,585)
Loss on debt extinguishment
(5,336)
(8,477)
—
Impairment of assets
5
—
—
(78,111)
(Increase) decrease in provision for discounting and
credit losses
 
9
(3,821)
8,042
(9,298)
Gain on disposal of asset held for sale
4
—
14,845
—
Other, net
6
33,795
(6,187)
(608)
Total
 
other expense, net
(42,994)
(59,839)
(138,602)
Income (loss) before tax
1,003,277
242,525
(286,553)
Income tax (expense) benefit
 
24
(231,574)
(53,102)
60,016
Net income (loss)
771,703
189,423
(226,537)
Less: Net loss attributable to noncontrolling
interest
—
(2)
(69)
Net income (loss) attributable to Coronado Global
Resources Inc.
$
771,703
$
189,425
$
(226,468)
Other comprehensive income, net of income taxes:
Foreign currency translation adjustment
26
(47,195)
(17,451)
21,488
Net gain (loss) on cash flow hedges, net of tax
26
—
2,029
(5,088)
Total
 
other comprehensive (loss) income
(47,195)
(15,422)
16,400
Total
 
comprehensive income (loss)
724,508
174,001
(210,137)
Less: Net loss attributable to noncontrolling
interest
—
(2)
(69)
Total
 
comprehensive income (loss) attributable to
Coronado Global Resources Inc.
 
$
724,508
$
174,003
$
(210,068)
Earnings (loss) per share of common stock
Basic
7
4.60
1.21
(2.04)
Diluted
7
4.60
1.21
(2.04)
See accompanying notes to consolidated financial
 
statements.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December 31,
 
2022
 
122
Consolidated Statements of Stockholders’ Equity
(In US$ thousands, except share data)
Common stock
Preferred stock
Additional
paid in
capital
Accumulated
other
comprehensive
losses
Retained
earnings
(Accumulated
losses)
Noncontrolling
interest
Total
stockholders'
equity
Shares
Amount
Series A
Amount
Balance December 31, 2019
96,651,692
$
967
1
$
—
$
820,247
$
(45,206)
$
91,712
$
221
$
867,941
Net loss
—
—
—
—
—
—
(226,468)
(69)
(226,537)
Other comprehensive income (net of
$
2,108
 
deferred income tax)
—
—
—
—
—
16,400
—
—
16,400
Total comprehensive income (loss)
—
—
—
—
—
16,400
(226,468)
(69)
(210,137)
Issuance of common stock, net
41,736,198
417
—
—
171,168
—
—
—
171,585
Stock-based compensation for equity
classified awards
—
—
—
—
1,637
—
—
—
1,637
Dividends
—
—
—
—
—
—
(24,163)
—
(24,163)
Balance December 31, 2020
138,387,890
$
1,384
1
$
—
$
993,052
$
(28,806)
$
(158,919)
$
152
$
806,863
Net income (loss)
—
—
—
—
—
—
189,425
(2)
189,423
Other comprehensive income (net of
$
870
 
deferred income tax)
—
—
—
—
—
(15,422)
—
—
(15,422)
Total comprehensive (loss) income
—
—
—
—
—
(15,422)
189,425
(2)
174,001
Issuance of common stock, net
29,257,483
293
—
—
97,448
—
—
—
97,741
Stock-based compensation for equity
classified awards
—
—
—
—
(250)
—
—
—
(250)
Acquisition of non-controlling interest
—
—
—
—
(703)
—
—
(150)
(853)
Balance December 31, 2021
167,645,373
$
1,677
1
$
—
$
1,089,547
$
(44,228)
$
30,506
$
—
$
1,077,502
Net income
—
—
—
—
—
—
771,703
—
771,703
Other comprehensive loss
—
—
—
—
—
(47,195)
—
—
(47,195)
Total comprehensive (loss) income
—
—
—
—
—
(47,195)
771,703
—
724,508
Stock-based compensation for equity
classified awards
—
—
—
—
2,735
—
—
—
2,735
Dividends
—
—
—
—
—
—
(701,655)
—
(701,655)
Balance December 31, 2022
167,645,373
$
1,677
1
$
—
$
1,092,282
$
(91,423)
$
100,554
$
—
$
1,103,090
See accompanying notes to consolidated financial
 
statements
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
123
Consolidated Statements of Cash Flows
(In US$ thousands)
Year Ended December 31,
2022
2021
2020
Cash flows from operating activities:
Net income (loss)
$
771,703
$
189,423
$
(226,537)
Adjustments to reconcile net income to cash and
 
restricted cash provided by
operating activities:
Depreciation, depletion and amortization
165,503
175,814
197,162
Impairment of Assets
—
—
78,111
Amortization of right of use asset - operating leases
6,704
8,899
13,285
Amortization of deferred financing costs
1,933
3,133
5,546
Non-cash interest expense
31,362
29,120
22,410
Amortization of contract obligations
(36,519)
(33,967)
(33,172)
Loss on disposal of property, plant and equipment
855
415
131
Decrease in contingent royalty consideration
—
—
(1,543)
Gain on operating lease derecognition
—
—
(1,184)
Equity-based compensation expense (gain)
2,735
(250)
1,637
Loss on debt extinguishment
5,336
8,477
—
Deferred income taxes
40,423
24,417
(11,247)
Reclamation of asset retirement obligations
(4,543)
(4,273)
(2,859)
Change in estimate of asset retirement obligation
1,543
2,061
(5,973)
Gain on disposal of asset held for sale
—
(14,845)
—
Increase (decrease) in provision for discounting and
 
credit losses
3,821
(8,042)
9,298
Changes in operating assets and liabilities:
Accounts receivable - including related party receivables,
 
net
(156,818)
(33,545)
(38,025)
Inventories
(41,243)
(9,637)
53,652
Other current assets
(12,365)
24,573
(1,921)
Accounts payable
(27,664)
24,166
6,833
Accrued expenses and other current liabilities
84,041
64,285
(27,829)
Operating lease liabilities
(8,244)
(10,986)
(15,329)
Income tax payable
96,326
—
—
Change in other liabilities
1,754
2,776
(25,446)
Net cash provided by (used in) operating activities
926,643
442,014
(3,000)
Cash flows from investing activities:
Capital expenditures
(199,716)
(89,661)
(117,856)
Proceeds from the disposal of property, plant, and equipment
318
1,594
—
Proceeds from disposal of assets held for sale
—
27,451
—
Purchase of restricted deposits
(9,761)
(103,997)
(2,302)
Redemption of restricted deposits
816
30,281
6,030
Net cash used in investing activities
(208,343)
(134,332)
(114,128)
Cash flows from financing activities:
Proceeds from interest bearing liabilities and other
 
financial liabilities
—
411,524
216,953
Debt issuance costs and other financing costs
—
(15,263)
(2,955)
Principal payments on interest bearing liabilities
 
and other financial liabilities
(81,310)
(412,046)
(221,414)
Call premiums paid on early redemption of debt
(2,557)
(1,050)
—
Principal payments on finance lease obligations
(140)
(70)
(2,481)
Dividends paid
(700,244)
—
(24,162)
Proceeds from stock issuance, net
—
97,741
171,585
Net cash (used in) provided by financing activities
(784,251)
80,836
137,526
Net (decrease) increase in cash and restricted
 
cash
(65,951)
388,518
20,398
Effect of exchange rate changes on cash and restricted
 
cash
(37,351)
3,677
(1,215)
Cash and restricted cash at beginning of period
437,931
45,736
26,553
Cash and restricted cash at end of period
$
334,629
$
437,931
$
45,736
Supplemental disclosure of cash flow information:
Cash payments for interest
$
36,728
$
33,462
$
23,538
Cash paid (refund) for taxes
$
90,888
$
(16,582)
$
1,955
See accompanying notes to consolidated financial
 
statements
 
 
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
124
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
1.
 
Description of Business, Basis of Presentation
(a)
Nature of operations
Coronado
 
Global
 
Resources Inc.
 
(together
 
with
 
its
 
subsidiaries,
 
the
 
“Company”
 
or
 
“Coronado”)
 
is
 
a
 
global
producer, marketer,
 
and exporter of a full range
 
of metallurgical coals, an
 
essential element in the production
 
of
steel. The Company
 
has a portfolio
 
of operating mines
 
and development projects
 
in Queensland, Australia
 
and
in the
 
states of Pennsylvania,
 
Virginia and West
 
Virginia in the
 
United States, or
 
U.S. For details
 
of the
 
Company’s
capital structure, refer to Note 7 “Capital Structure” for
 
further information.
(b)
Basis of Presentation
The
 
Consolidated
 
Financial
 
Statements
 
have
 
been
 
prepared
 
in
 
accordance
 
with
 
requirements
 
of
 
the
 
U.S.
Generally Accepted
 
Accounting
 
Principles,
 
or U.S.
 
GAAP and
 
are presented
 
in U.S.
 
dollars,
 
unless otherwise
stated.
The Consolidated Financial Statements include the accounts of the Company and its
 
affiliates. The Company, or
Coronado, are used interchangeably to refer to Coronado Global Resources Inc. or Coronado Global Resources
Inc. and
 
its subsidiaries,
 
as appropriate
 
to the
 
context. Interests
 
in subsidiaries
 
controlled by
 
the Company
 
are
consolidated
 
with
 
any
 
outside
 
stockholder
 
interests
 
reflected
 
as
 
noncontrolling
 
interests.
 
All
 
intercompany
balances and transactions have been eliminated on consolidation.
(c)
Certain Significant Risks and Uncertainties
External
 
factors,
 
including
 
general
 
economic
 
conditions,
 
international
 
events
 
and
 
circumstances,
 
competitor
actions, governmental actions
 
and regulations are beyond
 
the Company’s control
 
and can cause fluctuations
 
in
demand for coal and
 
volatility in the price
 
of commodities. This
 
in turn may adversely
 
impact on the
 
Company’s
future operating results, purchase or investment opportunities
 
in the coal mining industry.
Concentration of customers
The Company
 
has a
 
formal written
 
credit policy
 
that establishes
 
procedures to
 
determine creditworthiness
 
and
credit
 
limits
 
for
 
trade
 
customers
 
and
 
counterparties
 
in
 
the
 
over-the-counter
 
coal
 
market.
 
Generally,
 
credit
 
is
extended based on
 
an evaluation of
 
the customer’s financial
 
condition. Collateral is not
 
generally required, unless
credit cannot be established.
 
Payments from customers are generally due between
 
30 to 60 days after
 
invoicing. Invoicing usually occurs after
shipment
 
or
 
delivery
 
of
 
goods.
 
The
 
timing
 
between
 
the
 
recognition
 
of
 
revenue
 
and
 
receipt
 
of
 
payment
 
is
 
not
significant.
The Company had certain customers
 
whose accounts receivable balances individually represented
10
% or more
of
 
the
 
Company’s
 
total
 
accounts
 
receivable,
 
or
 
whose
 
revenue
 
individually
 
represented
10
%
 
or
 
more
 
of
 
the
Company’s total revenue.
The
 
following
 
table
 
summarizes
 
any
 
customer
 
whose
 
revenue
 
individually
 
represented
10
%
 
or
 
more
 
of
 
the
Company’s total revenue in the years ended December
 
31, 2022, 2021 and 2020.
Year Ended December 31,
2022
2021
2020
Xcoal
12%
11%
9%
Tata
 
Steel
19%
17%
17%
For the
 
year ended
 
December 31,
 
2022, $
1,848.8
 
million, or
52.6
% of
 
total revenues,
 
were attributable
 
to five
customers. In
 
comparison,
 
for the
 
year ended
 
December 31,
 
2021, $
971.6
 
million, or
46.3
% of
 
total revenues
were attributable to five customers and
 
for the year ended December 31,
 
2020, $
671.9
 
million, or
47.1
% of total
revenues were attributable
 
to five customers.
 
As of December
 
31, 2022, the
 
Company had
 
four customers that
accounted
 
for $
212.5
 
million,
 
or
51.6
%, of
 
accounts
 
receivable.
 
As of
 
December
 
31, 2021,
 
the
 
Company
 
had
four customers that accounted for $
149.2
 
million, or
54.7
%, of accounts receivable.
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
125
The
 
following
 
table
 
presents
 
revenues
 
as
 
a
 
percent
 
of
 
total
 
revenue
 
from
 
external
 
customers
 
by
 
geographic
region:
Year Ended December 31,
2022
2021
2020
North America
12%
7%
13%
Australia
4%
6%
6%
Asia
46%
48%
50%
Europe
11%
12%
13%
South America
8%
6%
4%
Brokered sales
19%
21%
14%
Total
100%
100%
100%
The Company uses shipping destination as the basis for attributing revenue to individual countries. Because title
may transfer on brokered
 
transactions at a point
 
that does not reflect
 
the end usage point,
 
they are reflected
 
as
exports, and attributed to an end delivery point if that knowledge
 
is known to the Company.
Concentration of labor
Out of the Company’s total employees,
11.5
% are subject to the Curragh
 
Mine Operations Enterprise Bargaining
Agreement 2019.
 
This agreement
 
covers work
 
carried out
 
by permanent,
 
full-time, temporary,
 
and casual
 
coal
mining employees
 
engaged by
 
Curragh to
 
fulfil production,
 
maintenance
 
and processing
 
activities. Other
 
than
the Curragh
 
Mine Operations
 
Enterprise
 
Bargaining Agreement
 
2019, there
 
are no
 
other collective
 
bargaining
agreements or union contracts covering employees of the Company
 
.
Transportation
The Company depends
 
upon port and
 
rail transportation
 
systems to deliver
 
coal to
 
its customers.
 
Disruption of
these
 
transportation
 
services
 
due
 
to
 
weather-related
 
problems,
 
mechanical
 
difficulties,
 
strikes,
 
lockouts,
bottlenecks, and other
 
events could temporarily
 
impair the Company’s
 
ability to supply
 
coal to its
 
customers. In
the past, disruptions in these services have resulted in
 
delayed shipments and production interruptions.
2.
 
Summary of Significant Accounting Policies
(a)
 
Newly Adopted Accounting Standards
During
 
the
 
period
 
there
 
have
 
been
 
no
 
new
 
Accounting
 
Standards
 
Updates
 
issued
 
by
 
the
 
Financial
 
Accounting
Standards Board that had a material impact on the Company’s Consolidated Financial Statements
.
 
(b)
 
Accounting Standards Not Yet
 
Implemented
To
 
date, there have
 
been no
 
recent accounting
 
pronouncements not
 
yet effective
 
that have significance,
 
or potential
significance, to the Company’s Consolidated Financial Statements.
 
(c) Use of Estimates
The preparation
 
of Consolidated
 
Financial
 
Statements
 
in conformity
 
with U.S. GAAP
 
requires
 
management
 
to
make certain
 
judgements, estimates
 
and assumptions
 
that affect
 
the reported
 
amounts of
 
assets and
 
liabilities
and disclosure of
 
contingent assets
 
and liabilities at
 
the date of
 
the Consolidated
 
Financial Statements
 
and the
reported amounts
 
of revenues
 
and expenses
 
during the
 
reporting periods.
 
Actual results
 
could differ
 
materially
from
 
those
 
estimates.
 
Significant
 
items
 
subject
 
to
 
such
 
estimates
 
and
 
assumptions
 
include
 
asset
 
retirement
obligations; useful
 
lives for
 
depreciation, depletion
 
and amortization;
 
deferred income
 
tax assets
 
and liabilities;
values
 
of
 
coal
 
properties;
 
fair
 
value
 
of
 
assets
 
held
 
for
 
sale,
 
workers’
 
compensation
 
liability
 
and
 
other
contingencies.
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
126
(d)
 
Foreign Currency
Financial Statements of foreign operations
The reporting currency of the Company is the U.S. Dollar,
 
or US$.
Functional
 
currency
 
is
 
determined
 
by
 
the
 
primary
 
economic
 
environment
 
in
 
which
 
an
 
entity
 
operates.
 
The
functional currency of
 
the Company
 
and its subsidiaries
 
is the US$,
 
with the exception
 
of two foreign
 
operating
subsidiaries, Curragh
 
and its
 
immediate parent
 
CAH, whose
 
functional currency
 
is the
 
Australian dollar,
 
or A$,
since Curragh’s predominant sources of operating
 
expenses are denominated in that currency.
Assets and liabilities
 
are translated at
 
the year-end exchange
 
rate and items
 
in the statement
 
of operations are
translated at average rates with gains and losses from
 
translation recorded in other comprehensive losses.
Foreign Currency Transactions
Monetary
 
assets
 
and
 
liabilities
 
are
 
remeasured
 
at
 
year-end
 
exchange
 
rates
 
while
 
non-monetary
 
items
 
are
remeasured at historical rates.
 
Gains and losses from foreign
 
currency remeasurement related to Curragh’s U.S. dollar receivables are
 
included
in coal revenues. All other gains and losses
 
from foreign currency remeasurement
 
and foreign currency forward
contracts
 
are
 
included
 
in
 
“Other,
 
net”,
 
with
 
exception
 
of
 
foreign
 
currency
 
gains
 
or
 
losses
 
on
 
long-term
intercompany
 
loan
 
balances
 
which
 
are classified
 
within
 
“Accumulated
 
other
 
comprehensive
 
losses”.
 
The
 
total
aggregate impact of foreign currency
 
transaction gains or losses on the
 
Consolidated Statements of Operations
and Comprehensive Income was a net gain of $
47.6
 
million and $
1.7
 
million and a net loss of $
3.2
 
million for the
years ended December 31, 2022, 2021 and 2020, respectively. The total impact of foreign currency transactions
related to U.S. dollar coal sales in Australia (included in the total above) was a net gain of $
15.0
 
million and $
8.7
million and a net loss of $
4.0
 
million for the years ended December 31, 2022, 2021
 
and 2020, respectively.
(e)
 
Cash and Cash Equivalents and Restricted Cash
Cash and cash
 
equivalents include cash
 
at bank and
 
short-term highly liquid investments
 
with an original
 
maturity
date of three months or less. At December 31, 2022 and 2021,
 
the Company had
no
 
cash equivalents.
“Cash
 
and
 
Restricted
 
Cash”,
 
as
 
disclosed
 
in
 
the
 
accompanying
 
Consolidated
 
Balance
 
Sheets
 
includes
 
$
0.3
million of restricted cash at December 31, 2022 and
 
$
0.3
 
million at 2021.
(f)
 
Trade Accounts Receivables
The Company
 
extends trade
 
credit to
 
its customers
 
in the
 
ordinary course
 
of business.
 
Trade
 
receivables are
recorded initially at fair value and subsequently at amortized
 
cost, less any Expected Credit Losses, or ECL.
 
For trade receivables
 
carried at amortized
 
cost, the Company
 
determines ECL on
 
a forward-looking
 
basis. The
amount of
 
ECL is
 
updated at
 
each reporting
 
date to reflect
 
changes in
 
credit risk
 
since initial recognition
 
of the
respective financial instrument.
 
The Company recognizes
 
the lifetime ECL. The
 
ECL is estimated
 
based on the
Company’s
 
historic credit
 
loss
 
experience,
 
adjusted for
 
factors that
 
are specific
 
to the
 
financial
 
asset, general
economic
 
conditions,
 
financial
 
asset
 
type,
 
term
 
and
 
an
 
assessment
 
of
 
both
 
the
 
current
 
as
 
well
 
as
 
forecast
conditions, including expected timing
 
of collection, at the
 
reporting date, modified for
 
credit enhancements such
as letters of credit obtained. To
 
measure ECL, trade receivables have been grouped based on shared credit risk
characteristics and the days past due.
 
The amount of credit
 
loss is recognized in
 
the Consolidated Statements
 
of Operations and Other Comprehensive
Income within “Provision for discounting and credit losses”. The Company writes off a financial asset when there
is information indicating there is no realistic prospect of recovery of the asset from the counterparty. Subsequent
recoveries of amounts
 
previously written off
 
are credited against “Provision
 
for discounting and
 
credit losses” in
the Consolidated Statements
 
of Operations and Other Comprehensive Income.
Factoring
The Company
 
has agreements
 
with financial
 
institutions to
 
sell selected
 
trade receivables
 
on a
 
recurring, non-
recourse
 
basis.
 
Under
 
these
 
agreements,
 
trade
 
receivables
 
sold
 
do
 
not
 
allow
 
for
 
recourse
 
for
 
any
 
credit
 
risk
related to the Company’s customers if such receivables
 
are not collected by the third-party financial institutions.
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
127
The
 
Company
 
derecognizes
 
the
 
trade
 
receivables
 
sold
 
under
 
the
 
factoring
 
arrangement
 
and
 
the
 
difference
between proceeds received and carrying amount of the trade receivables sold is
 
recognized within “Interest, net”
in its Consolidated Statements of Operations and Comprehensive
 
Income.
(g)
 
Inventories
Coal is recorded
 
as inventory at the
 
point in time
 
the coal is
 
extracted from the
 
mine. Raw coal
 
represents coal
stockpiles that
 
may be
 
sold in
 
current condition
 
or may
 
be further
 
processed prior
 
to shipment
 
to a
 
customer.
Saleable coal represents coal stockpiles which require
 
no further processing prior to shipment to a customer.
Coal inventories are stated
 
at the lower of average
 
cost and net realizable
 
value. The cost of coal
 
inventories is
determined based
 
on an
 
average cost
 
of production,
 
which includes
 
all costs
 
incurred to
 
extract, transport
 
and
process
 
the coal.
 
Net
 
realizable
 
value
 
considers
 
the
 
estimated
 
sales
 
price
 
of
 
the
 
particular
 
coal
 
product,
 
less
applicable selling costs, and, in the case of raw coal, estimated
 
remaining processing costs.
Supplies
 
inventory
 
is
 
comprised
 
of
 
replacement
 
parts
 
for
 
operational
 
equipment
 
and
 
other
 
miscellaneous
materials and supplies
 
required for mining
 
which are stated
 
at cost on the
 
date of purchase.
 
Supplies inventory
is valued at
 
the lower of
 
average cost or
 
net realizable
 
value, less a
 
reserve for obsolete
 
or surplus items.
 
This
reserve incorporates several factors, such as anticipated usage, inventory turnover and inventory levels. It is not
customary to sell these inventories; the Company plans
 
to use them in mining operations as needed.
(h)
 
Assets held for sale
Assets
 
held
 
for
 
sale
 
are
 
measured
 
at
 
the
 
lower
 
of
 
their
 
carrying
 
amount
 
or
 
fair
 
value
 
less
 
costs
 
to
 
sell.
 
The
Company classifies
 
assets and
 
liabilities as
 
held for
 
sale (disposal
 
group) when
 
management, having
 
the authority
to approve the action,
 
commits to a plan
 
to sell the disposal
 
group, the sale is
 
probable within one year
 
and the
disposal
 
group
 
is
 
available
 
for
 
sale
 
in
 
its
 
present
 
condition.
 
The
 
Company
 
also
 
considers
 
whether
 
an
 
active
program to locate a buyer
 
has been initiated, whether the
 
disposal group is marketed actively
 
for sale at a price
that is reasonable in relation
 
to its current fair value,
 
and whether actions required
 
to complete the plan indicate
that it is
 
unlikely that significant
 
changes to the
 
plan will be
 
made or that
 
the plan will
 
be withdrawn. An
 
impairment
test is performed when
 
a disposal group is
 
classified as held for sale
 
and an impairment charge is
 
recorded when
the carrying
 
amount of
 
the disposal
 
group exceeds
 
its estimated
 
fair value,
 
less cost
 
to sell.
 
Depreciation
 
and
amortization for assets classified as held for sale are ceased.
 
(i)
 
Property, Plant and
 
Equipment, Impairment of Long-Lived Assets and Goodwill
Property, Plant, and
 
Equipment
Costs for mine development incurred to
 
expand capacity of operating mines or to
 
develop new mines and certain
mining equipment are capitalized and charged to operations on the
 
hours of usage or units of production method
over
 
the
 
estimated
 
proven
 
and
 
probable
 
reserve
 
tons
 
directly
 
benefiting
 
from
 
the
 
capital
 
expenditures.
 
Mine
development
 
costs
 
include
 
costs
 
incurred
 
for
 
site
 
preparation
 
and
 
development
 
of
 
the
 
mines
 
during
 
the
development stage.
 
Mineral rights
 
and reserves
 
acquired are
 
measured at
 
cost and
 
are depleted
 
on a
 
units of
production
 
method
 
over
 
the
 
estimated
 
proven
 
and
 
probable
 
reserve
 
tons
 
of
 
the
 
relevant
 
mineral
 
property.
Capitalized costs related to internal-use software are amortized on
 
a straight-line basis over the estimated useful
lives of the assets.
Property,
 
plant,
 
and
 
equipment
 
are
 
recorded
 
at
 
cost
 
and
 
include
 
expenditures
 
for
 
improvements
 
when
 
they
substantially
 
increase
 
the
 
productive
 
lives
 
of existing
 
assets.
 
Depreciation
 
is calculated
 
using
 
the
 
straight-line
method over
 
the estimated
 
useful lives
 
of the
 
depreciable assets of
3
 
to
10
 
years for machinery, mining
 
equipment
and
 
transportation
 
vehicles,
5
 
to
10
 
years
 
for
 
office
 
equipment,
 
and
10
 
to
20
 
years
 
for
 
plant,
 
buildings
 
and
improvements.
Maintenance and
 
repair costs
 
are expensed to
 
operations as
 
incurred. When
 
equipment is
 
retired or
 
disposed,
the related cost
 
and accumulated
 
depreciation are
 
removed from
 
the respective
 
accounts and any
 
gain or loss
on disposal is recognized in operations.
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
128
Impairment of long-lived assets
Long-lived
 
assets,
 
such
 
as
 
property,
 
plant,
 
and
 
equipment,
 
and
 
purchased
 
intangible
 
assets
 
subject
 
to
amortization,
 
are
 
reviewed
 
for
 
impairment
 
whenever
 
events
 
or
 
changes
 
in
 
circumstances
 
indicate
 
that
 
the
carrying amount of an
 
asset may not be
 
recoverable. If circumstances
 
require a long-lived asset
 
or asset group
be
 
tested
 
for
 
possible
 
impairment,
 
the
 
Company
 
first
 
compares
 
undiscounted
 
cash
 
flows
 
expected
 
to
 
be
generated by
 
that asset
 
or asset
 
group to
 
its carrying
 
amount. If
 
the carrying
 
amount of
 
the long-lived
 
asset or
asset group
 
is not
 
recoverable on
 
an undiscounted
 
cash flow
 
basis, an
 
impairment is
 
recognized to
 
the extent
that the
 
carrying amount
 
exceeds its
 
fair value.
 
Fair value
 
is determined
 
through
 
various valuation
 
techniques
including
 
discounted
 
cash
 
flow
 
models,
 
quoted
 
market
 
values
 
and
 
third-party
 
independent
 
appraisals,
 
as
considered necessary.
 
Refer to Note 5 “Impairment of Assets” for further disclosure
 
.
Goodwill
Goodwill is an asset
 
representing the future economic
 
benefits arising from other
 
assets acquired in a
 
business
combination
 
that
 
are
 
not
 
individually
 
identified
 
and
 
separately
 
recognized.
 
In
 
connection
 
with
 
the
 
Buchanan
acquisition on
 
March 31, 2016,
 
the Company
 
recorded goodwill
 
in the
 
amount of
 
$
28.0
 
million. Goodwill
 
is not
amortized but
 
is reviewed
 
for impairment
 
annually or
 
when circumstances or
 
other events
 
indicate that
 
impairment
may have occurred. The Company follows the guidance in Accounting Standards Update 2017-04 “
Intangibles –
Goodwill
 
and
 
Other:
 
Simplifying
 
the
 
Test
 
for
 
Goodwill
 
Impairment
”
 
(ASU 2017-04).
 
The
 
Company
 
makes
 
a
qualitative assessment of whether it
 
is more likely than
 
not that a
 
reporting unit’s fair value is
 
less than its carrying
amount. Circumstances that are considered as
 
part of the qualitative
 
assessment and could trigger a
 
quantitative
impairment test include but are
 
not limited to: a significant
 
adverse change in the business
 
climate; a significant
adverse legal judgment;
 
adverse cash flow
 
trends; an
 
adverse action
 
or assessment
 
by a government
 
agency;
unanticipated
 
competition;
 
and
 
a
 
significant
 
restructuring
 
charge
 
within
 
a
 
reporting
 
unit.
 
If
 
a
 
quantitative
assessment
 
is
 
determined
 
to
 
be
 
necessary,
 
the
 
Company
 
compares
 
the
 
fair
 
value
 
of
 
a
 
reporting
 
unit
 
with
 
its
carrying amount, including goodwill.
 
If the carrying amount
 
of a reporting unit
 
exceeds its fair value,
 
the Company
recognizes an impairment
 
charge for the
 
amount by which
 
the carrying amount
 
exceeds its fair
 
value to the
 
extent
of the amount of goodwill allocated to that reporting unit.
The Company defines reporting
 
units at the mining
 
asset level. For purposes
 
of testing goodwill for
 
impairment,
goodwill has been allocated to the reporting units to the
 
extent it relates to each reporting unit.
(j)
 
Asset Retirement Obligations
The
 
Company’s
 
asset
 
retirement
 
obligation,
 
or
 
ARO,
 
liabilities
 
primarily
 
consist
 
of
 
estimates
 
of
 
surface
 
land
reclamation
 
and
 
support
 
facilities
 
at
 
both
 
surface
 
and
 
underground
 
mines
 
in
 
accordance
 
with
 
applicable
reclamation laws and regulations in the U.S. and Australia
 
as defined by each mining permit.
The Company
 
estimates its ARO
 
liabilities for
 
final reclamation
 
and mine
 
closure based upon
 
detailed engineering
calculations of the amount
 
and timing of the future
 
cash spending for a
 
third party to perform
 
the required work.
Spending
 
estimates
 
are
 
escalated
 
for
 
inflation
 
and
 
then
 
discounted
 
at
 
the
 
credit-adjusted,
 
risk-free
 
rate.
 
The
Company records
 
an ARO asset
 
associated with
 
the discounted
 
liability for final
 
reclamation and
 
mine closure.
The obligation
 
and corresponding
 
asset are recognized
 
in the period
 
in which the
 
liability is incurred.
 
The ARO
asset
 
is
 
amortized
 
on
 
the
 
units-of-production
 
method
 
over
 
its
 
expected
 
life
 
of
 
the
 
related
 
asset
 
and
 
the
 
ARO
liability is accreted to the projected
 
spending date. As changes
 
in estimates occur (such as
 
mine plan revisions,
changes in
 
estimated costs
 
or changes
 
in timing
 
of the
 
performance of
 
reclamation activities),
 
the revisions
 
to
the
 
obligation
 
and
 
asset
 
are
 
recognized
 
at
 
the
 
appropriate
 
credit-adjusted,
 
risk-free
 
rate.
 
The
 
Company
 
also
recognizes
 
an
 
obligation
 
for
 
contemporaneous
 
reclamation
 
liabilities
 
incurred
 
as
 
a
 
result
 
of
 
surface
 
mining.
Contemporaneous reclamation consists primarily
 
of grading, topsoil replacement
 
and re-vegetation of backfilled
pit areas. To
 
settle the liability,
 
the obligation is paid,
 
and to the extent
 
there is a difference
 
between the liability
and
 
the
 
amount
 
of cash
 
paid,
 
a
 
gain
 
or
 
loss
 
upon
 
settlement
 
is
 
recorded.
 
The
 
Company
 
annually
 
reviews
 
its
estimated future cash flows for its asset retirement obligations.
(k)
 
Borrowing costs
Borrowing costs are
 
recognized as an
 
expense when they
 
are incurred, except
 
for interest charges
 
attributable
to major projects with substantial development and construction phases which are capitalized
 
as part of the cost
of the asset. There was
no
 
interest capitalized during the years ended December 31, 2022
 
and 2021.
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
129
(l)
 
Leases
From time
 
to time,
 
the Company
 
enters into
 
mining services
 
contracts which
 
may include
 
embedded leases
 
of
mining equipment
 
and other
 
contractual agreements
 
to lease
 
mining equipment
 
and facilities.
 
Based upon
 
the
Company’s
 
assessment
 
of the
 
terms
 
of a
 
specific
 
lease agreement,
 
the Company
 
classifies a
 
lease
 
as either
finance or operating.
Finance leases
Right of Use,
 
or ROU,
 
assets related
 
to finance
 
leases are
 
presented in
 
Property,
 
plant and
 
equipment, net
 
on
the Consolidated
 
Balance Sheet.
 
Lease liabilities
 
related to
 
finance leases
 
are presented
 
in “Lease
 
Liabilities”
(current) and “Lease Liabilities” (non-current) on the Consolidated
 
Balance Sheets.
Finance lease ROU assets and lease liabilities are recognized at the commencement date based on the present
value of the
 
future lease payments
 
over the lease
 
term. The
 
discount rate used
 
to determine
 
the present
 
value
of the
 
lease
 
payments
 
is the
 
rate
 
implicit in
 
the
 
lease unless
 
that
 
rate cannot
 
be readily
 
determined,
 
in which
case, the
 
Company utilizes
 
its incremental
 
borrowing
 
rate in
 
determining the
 
present value
 
of the
 
future lease
payments. The incremental borrowing
 
rate is the rate
 
of interest that the
 
Company would have to
 
pay to borrow
on
 
a
 
collateralized
 
basis
 
over
 
a
 
similar
 
term
 
an
 
amount
 
equal
 
to
 
the
 
lease
 
payments
 
in
 
a
 
similar
 
economic
environment.
Operating leases
ROU
 
assets
 
related to
 
operating
 
leases
 
are presented
 
as Right
 
of Use
 
assets
 
– operating
 
leases,
 
net
 
on the
Consolidated
 
Balance
 
Sheet.
 
Lease
 
liabilities
 
related
 
to
 
operating
 
leases
 
that
 
are
 
subject
 
to
 
the
 
ASC
 
842
measurement requirements such as operating
 
leases with lease terms
 
greater than twelve months are
 
presented
in “Lease Liabilities” (current) and “Lease Liabilities” (non-current)
 
on Consolidated Balance Sheets.
 
Operating lease
 
ROU assets and
 
lease liabilities
 
are recognized at
 
the commencement date
 
based on
 
the present
value of the
 
future lease payments
 
over the lease
 
term. The
 
discount rate used
 
to determine
 
the present
 
value
of the
 
lease
 
payments
 
is the
 
rate
 
implicit in
 
the
 
lease unless
 
that
 
rate cannot
 
be readily
 
determined,
 
in which
case, the
 
Company utilizes
 
its incremental
 
borrowing
 
rate in
 
determining
 
the present
 
value of
 
the future
 
lease
payments. The incremental borrowing
 
rate is the rate
 
of interest that the
 
Company would have to
 
pay to borrow
on
 
a
 
collateralized
 
basis
 
over
 
a
 
similar
 
term
 
an
 
amount
 
equal
 
to
 
the
 
lease
 
payments
 
in
 
a
 
similar
 
economic
environment. Operating
 
lease ROU
 
assets may
 
also include
 
any cumulative
 
prepaid or
 
accrued rent
 
when the
lease payments
 
are uneven
 
throughout the
 
lease term.
 
The ROU
 
assets and
 
lease liabilities
 
may also
 
include
options to extend or terminate the lease when it is reasonably certain that the Company will exercise that option.
The ROU
 
asset includes
 
any lease
 
payments made
 
and lease
 
incentives received
 
prior to
 
the commencement
date.
 
The
 
Company
 
has
 
lease
 
arrangements
 
with
 
lease
 
and
 
non-lease
 
components
 
which
 
are
 
accounted
 
for
separately.
 
Non-lease
 
components
 
of
 
the
 
lease
 
payments
 
are
 
expensed
 
as
 
incurred
 
and
 
are
 
not
 
included
 
in
determining the present value.
(m) Royalties
Lease rights
 
to coal
 
lands are
 
often acquired
 
in exchange
 
for royalty
 
payments. Royalties
 
are payable
 
monthly
as a percentage of the gross
 
realization from the sale of the coal
 
mined using surface mining methods
 
and as a
percentage
 
of
 
the
 
gross
 
realization
 
for
 
coal
 
produced
 
using
 
underground
 
mining
 
methods.
 
Advance
 
mining
royalties are advance
 
payments made to
 
lessors under terms
 
of mineral lease
 
agreements that are
 
recoupable
against
 
future
 
production.
 
The
 
Company
 
had
 
advance
 
mining
 
royalties
 
of
 
$
6.8
 
million
 
and
 
$
5.5
 
million
respectively, included
 
in “Other current assets” as of December 31, 2022
 
and 2021.
(n)
 
Stanwell Rebate
The
 
Stanwell
 
rebate
 
relates
 
to
 
a
 
contractual
 
arrangement
 
entered
 
into
 
by
 
Curragh
 
with
 
Stanwell
 
Corporation
Limited, a State
 
of Queensland
 
owned electricity
 
generator, which
 
requires payment
 
of a rebate
 
for export coal
sold from some of Curragh’s
 
mining tenements. The rebate obligation is
 
accounted for as an executory
 
contract
and the expense is recognized as incurred.
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
130
(o)
 
Revenue Recognition
The Company accounts for
 
a contract when it
 
has approval and commitment
 
from both parties, the
 
rights of the
parties are identified,
 
payment terms
 
are identified,
 
the contract has
 
commercial substance
 
and collectability
 
of
consideration is probable. Once a contract
 
is identified, the Company evaluates
 
whether the combined or single
contract should be accounted for as more than one performance
 
obligation.
The Company recognizes revenue when
 
control is transferred to the customer.
 
For the Company’s contracts,
 
in
order to determine
 
the point
 
in time when
 
control transfers
 
to customers, the
 
Company uses
 
standard shipping
terms to
 
determine
 
the timing
 
of transfer
 
of
 
legal title
 
and the
 
significant
 
risks
 
and rewards
 
of ownership.
 
The
Company also considers other
 
indicators including timing
 
of when the Company
 
has a present right
 
to payment
and
 
when
 
physical
 
possession
 
of
 
products
 
is
 
transferred
 
to
 
customers.
 
The
 
amount
 
of
 
revenue
 
recognized
includes any
 
adjustments for
 
variable consideration,
 
which is
 
included in
 
the transaction
 
price and
 
allocated to
each
 
performance
 
obligation
 
based
 
on
 
the
 
relative
 
standalone
 
selling
 
price.
 
The
 
variable
 
consideration
 
is
estimated through the course of the contract using management’s
 
best estimates.
The majority of
 
the Company’s revenue is derived
 
from short term
 
contracts where the time
 
between confirmation
of sales orders and collection of cash is not more than
 
a few months.
Taxes
 
assessed
 
by
 
a
 
governmental
 
authority
 
that
 
are
 
both
 
imposed
 
on
 
and
 
concurrent
 
with
 
a
 
specific
revenue-producing transaction that are collected by the
 
Company from a customer are excluded from revenue.
Performance obligations
A
 
performance
 
obligation
 
is
 
a
 
promise
 
in
 
a
 
contract
 
to
 
transfer
 
a
 
distinct
 
good
 
or
 
service
 
to
 
the
 
customer.
 
A
contract’s transaction price is allocated
 
to each distinct performance obligation
 
and recognized as revenue
 
when,
or as, the performance obligation is satisfied.
The Company’s contracts have
 
multiple performance obligations as the
 
promise to transfer the individual
 
unit of
coal
 
is
 
separately
 
identifiable
 
from
 
other
 
units
 
of
 
coal
 
promised
 
in
 
the
 
contracts
 
and,
 
therefore,
 
distinct.
Performance obligations, as described above, primarily relate to the Company’s
 
promise to deliver a designated
quantity and type of coal within the quality specifications
 
stated in the contract.
For
 
contracts
 
with
 
multiple
 
performance
 
obligations,
 
we
 
allocate
 
the
 
contract’s
 
transaction
 
price
 
to
 
each
performance obligation on a relative standalone selling price basis. The
 
standalone selling price is determined at
each contract inception using
 
an adjusted market assessment
 
approach. This approach focuses
 
on the amount
that the Company believes the market is willing to pay
 
for a good or service, considering market conditions, such
as benchmark pricing, competitor pricing, market awareness of the product and current market trends that affect
the pricing.
Warranties provided to customers are
 
assurance-type of warranties on
 
the fitness of
 
purpose and merchantability
of the Company’s goods. The Company does not
 
provide service-type of warranties to customers.
Revenue
 
is
 
recognized
 
at
 
a
 
point
 
in
 
time
 
and
 
therefore
 
there
 
are
no
 
unsatisfied
 
and/or
 
partially
 
satisfied
performance obligations at December 31, 2022 and 2021.
Shipping and Handling
The Company
 
accounts
 
for
 
shipping
 
and
 
handling
 
activities
 
on
 
Free
 
on
 
Rail
 
sales
 
after
 
the
 
customer
 
obtains
control of the good as an activity to fulfil the promise to transfer the good. In this instance, shipping and handling
costs
 
paid
 
to
 
third
 
party
 
carriers
 
and
 
invoiced
 
to
 
coal
 
customers
 
are
 
recorded
 
as
 
freight
 
expense
 
and
 
other
revenues, respectively.
(p)
 
Commodity Price Risk
The Company has commodity price risk arising from fluctuations
 
in domestic and global coal prices.
 
The
 
Company’s
 
principal
 
philosophy
 
is
 
not
 
to
 
hedge
 
against
 
movements
 
in
 
coal
 
prices
 
unless
 
there
 
are
exceptional circumstances.
 
Any potential hedging of coal prices would be through fixed
 
price contracts.
 
The
 
Company
 
is
 
also
 
exposed
 
to
 
commodity
 
price
 
risk
 
related
 
to
 
diesel
 
fuel
 
purchases.
 
The
 
Company
 
may
periodically enter into arrangements that protect against
 
the volatility in fuel prices as follows:
•
 
enter into fixed price contracts to purchase fuel for the U.S. Operations
 
.
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
131
•
 
enter into derivative financial instruments to hedge exposures to fuel
 
price fluctuations.
 
There are
no
 
derivative contracts outstanding at December 31, 2022
 
and 2021.
(q)
 
Income Taxes
The Company uses the asset
 
and liability approach to account
 
for income taxes as required by
 
ASC 740, Income
Taxes,
 
which requires
 
the
 
recognition
 
of deferred
 
income
 
tax assets
 
and
 
liabilities
 
for the
 
expected
 
future
 
tax
consequences
 
attributable
 
to differences
 
between
 
the
 
financial
 
statement
 
carrying
 
amounts
 
of
 
existing
 
assets
and liabilities and their respective tax bases.
Valuation allowances are provided
 
when necessary to
 
reduce deferred income
 
tax assets to
 
the amount expected
to be realized, on a more likely than not basis.
The Company recognizes the
 
benefit of an uncertain
 
tax position that it has
 
taken or expects
 
to take on income
tax
 
returns
 
it
 
files
 
if
 
such
 
tax
 
position
 
is
 
more
 
likely
 
than
 
not
 
to
 
be
 
sustained
 
on
 
examination
 
by
 
the
 
taxing
authorities, based on the technical merits
 
of the position. These tax benefits
 
are measured based on the largest
benefit that has a greater than 50% likelihood of being realized
 
upon ultimate resolution.
The Company’s foreign
 
structure consists of
 
Australian entities which
 
are treated as
 
corporations subject to
 
tax
under Australian
 
taxing authorities.
 
The Curragh
 
entities are
 
treated as
 
a branch
 
for U.S.
 
tax purposes
 
and all
income flows through the ultimate parent (the Company).
(r)
 
Fair Value Measurements
The Company utilizes valuation
 
techniques that maximize
 
the use of observable inputs
 
and minimize the use of
unobservable
 
inputs
 
to
 
the
 
extent
 
possible.
 
The
 
Company
 
determines
 
fair
 
value
 
based
 
on
 
assumptions
 
that
market
 
participants
 
would
 
use
 
in
 
pricing
 
an
 
asset
 
or
 
liability
 
in
 
the
 
principal
 
or
 
most
 
relevant
 
market.
 
When
considering
 
market
 
participant
 
assumptions
 
in
 
fair
 
value
 
measurements,
 
the
 
Company
 
distinguishes
 
between
observable and unobservable inputs, which are categori
 
zed in one of 3 levels of inputs.
Refer to Note 25 “Fair
 
Value
 
Measurement” for detailed
 
information related to the
 
Company’s fair value
 
policies
and disclosures.
(s)
 
Derivative accounting
The Company recognizes at fair value all contracts meeting the definition of a derivative as assets or liabilities in
the Consolidated Balance Sheet.
With
 
respect
 
to
 
derivatives
 
used
 
in
 
hedging
 
activities,
 
the
 
Company
 
assesses,
 
both
 
at
 
inception
 
and
 
at
 
least
quarterly
 
thereafter,
 
whether
 
such
 
derivatives
 
are
 
highly
 
effective
 
at
 
offsetting
 
the
 
changes
 
in
 
the
 
anticipated
exposure of the
 
hedged item.
 
The change
 
in the fair
 
value of derivatives
 
designated as a
 
cash flow
 
hedge and
deemed highly effective
 
is recorded
 
in “Accumulated
 
other comprehensive
 
losses” until
 
the hedged
 
transaction
impacts reported earnings,
 
at which
 
time any gain
 
or loss is
 
reclassified to earnings.
 
If the
 
hedge ceases to
 
qualify
for
 
hedge
 
accounting,
 
the
 
Company
 
prospectively
 
recognizes
 
changes
 
in
 
the
 
fair
 
value
 
of
 
the
 
instrument
 
in
earnings in the
 
period of the
 
change. The
 
potential for
 
hedge ineffectiveness
 
is present in
 
the design
 
of certain
of the Company’s cash flow hedge relationships.
The Company’s
 
asset and
 
liability derivative
 
positions are
 
offset on
 
a counterparty-by-counterparty
 
basis if
 
the
contractual agreement provides for the net settlement of contracts with the
 
counterparty in the event of default or
termination of any one contract.
There are
no
 
derivative contracts outstanding at December 31, 2022
 
and 2021.
(t)
 
Stock-based Compensation
The Company has
 
a stock-based compensation plan
 
which allows for
 
the grant of
 
certain equity-based incentives
including stock options,
 
performance stock units,
 
or PSU, and
 
restricted stock units,
 
or RSU, to
 
employees and
executive
 
directors,
 
valued
 
in
 
whole
 
or
 
in
 
part
 
with
 
reference
 
to
 
the
 
Company’s
 
CDIs
 
or
 
equivalent
 
common
shares (on a
10.1
 
CDI to common share ratio).
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
132
The grant-date
 
fair value
 
of stock
 
option
 
award is
 
estimated on
 
the
 
date
 
of grant
 
using
 
Black-Scholes-Merton
option-pricing model. For
 
certain options and
 
PSUs, the Company includes
 
a relative Total
 
Stockholder Return,
or TSR, modifier to determine the number of shares
 
earned at the end of the performance period.
 
The fair value
of awards that include the TSR modifier is determined
 
using a Monte Carlo valuation model.
The expense for these equity-based incentives is based on their fair value at date of grant and is amortized over
the required service
 
period, generally the vesting
 
period. The Company accounts
 
for forfeitures as
 
and when they
occur.
Refer to
 
Note
 
23 “Stock-Based
 
Compensation”
for detailed
 
information
 
related
 
to the
 
Company’s
 
stock-based
compensation plans.
(
u)
 
Earnings per Share
Basic earnings per share is computed by dividing net income attributable to stockholders of the Company by the
weighted-average number of shares of common stock
 
outstanding during the reporting period.
Diluted net income
 
per share is computed
 
using the weighted-average
 
number of shares
 
of common stock
 
and
dilutive
 
potential
 
shares
 
of
 
common
 
stock
 
outstanding
 
during
 
the
 
period.
 
Dilutive
 
potential
 
shares
 
of
 
common
stock primarily consist of employee stock options and
 
restricted stock.
(v)
 
Deferred Financing Costs
The Company capitalizes costs
 
incurred in connection with new
 
borrowings, the establishment or
 
enhancement
of credit
 
facilities
 
and the
 
issuance
 
of debt
 
securities.
 
These costs
 
are amortized
 
as an
 
adjustment to
 
interest
expense
 
over
 
the
 
life
 
of
 
the
 
borrowing
 
or
 
term
 
of
 
the
 
credit
 
facility
 
using
 
the
 
effective
 
interest
 
method.
 
Debt
issuance costs related to a recognized
 
liability are presented in the balance
 
sheet as a direct reduction from
 
the
carrying amount of that liability whereas debt issuance costs
 
related to a credit facility are shown as an asset.
 
For information on the
 
unamortized balance of
 
deferred financing fees
 
related to outstanding
 
debt, see Note
 
17
“Interest Bearing Liabilities”.
3.
 
Segment Information
The Company has
 
a portfolio of operating
 
mines and development
 
projects in Queensland,
 
Australia and in the
states of
 
Pennsylvania,
 
Virginia
 
and West
 
Virginia
 
in the
 
U.S. The
 
Australian Operations
 
comprise the
 
100%-
owned
 
Curragh
 
producing
 
mine
 
complex.
 
The
 
U.S.
 
Operations
 
comprise
two
 
100%-owned
 
producing
 
mine
complexes (Buchanan and Logan),
one
 
100%-owned idled mine complex which is held for sale (Greenbrier) and
two
 
development properties (Mon Valley
 
and Russell County).
 
The
 
Company
 
operates
 
its
 
business
 
along
two
 
reportable
 
segments:
 
Australia
 
and
 
United
 
States.
 
The
organization of the
two
 
reportable segments reflects how Coronado’s chief
 
operating decision maker, or
 
CODM,
manages and allocates resources to the various components
 
of the Company’s business.
 
The CODM
 
uses Adjusted
 
EBITDA as
 
the primary
 
metric to
 
measure each
 
segment’s
 
operating performance.
Adjusted EBITDA is not a measure of financial performance in accordance with U.S. GAAP.
 
Investors should be
aware that
 
the Company’s
 
presentation of
 
Adjusted EBITDA
 
may not
 
be comparable
 
to similarly
 
titled financial
measures used by other companies.
 
Adjusted EBITDA is
 
defined as earnings
 
before interest, taxes,
 
depreciation, depletion and
 
amortization and other
foreign exchange losses. Adjusted EBITDA is
 
also adjusted for certain discrete items that
 
management exclude
in analyzing each
 
of the
 
Company’s segments’ operating performance.
 
“Other and corporate”
 
relates to additional
financial information for the corporate function such
 
as financial reporting and accounting, treasury, legal, human
resources, compliance,
 
and tax.
 
As such, the
 
corporate function
 
is not determined
 
to be
 
a reportable segment
but is discretely disclosed for purposes of reconciliation to the
 
Company’s Consolidated Financial Statements.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
133
Reportable segment results for the years ended December 31,
 
2022, 2021 and 2020 are presented below:
(US$ thousands)
Australia
United
States
Other and
Corporate
Total
Year ended December 31,
 
2022
Total
 
revenues
$
2,116,555
$
1,454,987
$
—
$
3,571,542
Adjusted EBITDA
541,208
716,661
(42,245)
1,215,624
Net income (loss)
328,632
486,817
(43,746)
771,703
Total
 
assets
1,353,424
1,013,359
183,144
2,549,927
Capital expenditures
89,001
95,769
587
185,357
Year ended December 31,
 
2021
Total
 
revenues
$
1,315,851
$
832,620
$
—
$
2,148,471
Adjusted EBITDA
204,992
312,048
(30,907)
486,133
Net income (loss)
64,278
220,975
(95,830)
189,423
Total
 
assets
1,357,132
822,222
282,058
2,461,412
Capital expenditures
38,733
50,787
1,616
91,136
Year ended December 31,
 
2020
Total
 
revenues
$
976,369
$
485,893
$
—
$
1,462,262
Adjusted EBITDA
(8,586)
92,801
(30,416)
53,799
Net loss
(66,645)
(77,853)
(82,039)
(226,537)
Total
 
assets
1,307,745
908,361
(67,630)
2,148,476
Capital expenditures
47,456
74,881
1,519
123,856
The reconciliation of Adjusted EBITDA to net income attributable to the Company for
 
the years ended December
31, 2022, 2021 and 2020 are as follows:
Year Ended December 31,
(US$ thousands)
2022
2021
2020
Net income (loss)
$
771,703
$
189,423
$
(226,537)
Depreciation, depletion and amortization
167,046
177,875
191,189
Interest expense, net
67,632
68,062
50,585
Other foreign exchange (gains) losses
(1)
(32,259)
7,049
1,175
Loss on debt extinguishment
5,336
8,477
—
Income tax expense (benefit)
231,574
53,102
(60,016)
Impairment of assets
—
—
78,111
Restructuring costs
—
2,300
—
Losses on idled assets held for sale
(2)
771
2,732
9,994
Gain on disposal of assets held for sale
—
(14,845)
—
Increase (decrease) in provision for discounting
 
and credit losses
3,821
(8,042)
9,298
Consolidated adjusted EBITDA
$
1,215,624
$
486,133
$
53,799
(1)
Refer to Note 6 “Other, net” for further discussion.
(2)
These losses relate to idled non-core assets that the Company has classified as held
 
for sale with the view that these will be
 
sold within the next
twelve months or were sold in prior periods.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
134
The
 
reconciliations
 
of
 
capital
 
expenditures
 
per
 
the
 
Company’s
 
segment
 
information
 
to
 
capital
 
expenditures
disclosed on
 
the Consolidated
 
Statements of
 
Cash Flows
 
for the
 
years ended
 
December
 
31, 2022,
 
2021 and
2020 are as follows:
Year Ended December 31,
(US$ thousands)
2022
2021
2020
Capital expenditures per Consolidated Statement of Cash
flows
$
199,716
$
89,661
$
117,856
Payment for capital acquired in prior period
(7,475)
(6,000)
—
Accruals for capital expenditures
11,243
7,475
6,000
Advance payment to acquire long lead capital items
 
(18,127)
—
—
Capital expenditures per segment detail
$
185,357
$
91,136
$
123,856
Disaggregation of Revenue
The Company disaggregates the revenue
 
from contracts with customers by
 
major product group for each of
 
the
Company’s
 
segments,
 
as the
 
Company
 
believes
 
it best
 
depicts the
 
nature,
 
amount,
 
timing
 
and
 
uncertainty
 
of
revenues and cash flows. All revenue is recognized at a point
 
in time.
Year ended December 31, 2022
(US$ thousands)
Australia
United States
Total
Product Groups:
Metallurgical coal
$
1,968,173
$
1,394,880
$
3,363,053
Thermal coal
110,345
54,228
164,573
Total
 
coal revenue
2,078,518
1,449,108
3,527,626
Other
(1)
38,037
5,879
43,916
Total
$
2,116,555
$
1,454,987
$
3,571,542
Year ended December 31, 2021
(US$ thousands)
Australia
United States
Total
Product Groups:
Metallurgical coal
$
1,171,869
$
822,000
$
1,993,869
Thermal coal
107,867
6,595
114,462
Total
 
coal revenue
1,279,736
828,595
2,108,331
Other
(1)
36,115
4,025
40,140
Total
$
1,315,851
$
832,620
$
2,148,471
Year ended December 31, 2020
(US$ thousands)
Australia
United States
Total
Product Groups:
Metallurgical coal
$
836,545
$
476,222
$
1,312,767
Thermal coal
105,681
5,151
110,832
Total
 
coal revenue
942,226
481,373
1,423,599
Other
(1)
34,143
4,520
38,663
Total
$
976,369
$
485,893
$
1,462,262
(1)
Included in
 
Other is
 
the amortization
 
of Stanwell
 
non-market coal
 
supply agreement
 
liability recognized
 
on acquisition
 
of Curragh.
 
See further
discussion in Note 19 “Contract Obligations”.
Further explanation to tables above:
The following is a description of the principal activities
 
by reportable segments.
•
 
The Company primarily offers two types of products to its
 
customers: metallurgical coal and thermal coal
of
 
varying
 
qualities.
 
The
 
Company’s
 
metallurgical
 
coal
 
is
 
classified
 
as
 
hard
 
coking
 
coal,
 
further
distinguished by its volatility (defined as high, mid, or low),
 
and pulverized coal injection.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
135
•
 
The Australian Operations reportable segment
 
includes the Curragh mine. The
 
Australian Operations is
a separate
 
reportable segment
 
due to
 
having separate
 
management, location,
 
assets, and
 
operations.
 
Curragh
 
mine,
 
included
 
in
 
the
 
Australian
 
Operations,
 
is
 
located
 
in
 
central
 
Queensland,
 
Australia
 
and
produces a wide variety of metallurgical coal.
•
 
The United States reportable segment includes the Buchanan, Logan and Greenbrier coal
 
mine facilities
in Virginia and West Virginia,
 
United States. It produces high, mid and low volatility
 
hard coking coal.
4. Assets Held for Sale
During the fourth quarter of 2020, the Company committed to a plan to sell the Greenbrier asset and determined
that all of
 
the criteria to
 
classify assets and liabilities
 
as held for
 
sale were met.
 
The asset is part
 
of the Company’s
U.S. segment,
 
located
 
in the
 
State
 
of
 
West
 
Virginia,
 
and
 
does
 
not form
 
part
 
of
 
the Company’s
 
core
 
business
strategy. The Greenbrier
 
mining asset has been idle since April 1, 2020.
 
The following table provides the major classes of assets and liabilities classified as held for sale as of December
31, 2022 and December 31, 2021:
December 31
 
(US$ thousands)
2022
2021
Inventories, net
—
1,795
Other current assets
2,326
1,706
Property, plant and
 
equipment, net
23,447
23,447
Other noncurrent assets
441
75
Total
 
assets held for sale
$
26,214
$
27,023
Accounts payable
313
426
Accrued expenses and other current liabilities
813
1,344
Current asset retirement obligations
5,137
5,140
Noncurrent asset retirement obligations
5,978
5,203
Total
 
liabilities held for sale
$
12,241
$
12,113
As of December 31, 2022, the assets
 
and liabilities held for sale represent the fair value
 
of the Greenbrier mining
asset, which will likely be realized through a sale within
 
the next 12 months.
 
The fair
 
value of
 
the Greenbrier
 
mining asset
 
was
 
primarily
 
determined
 
by reference
 
to non-binding
 
indicative
offers and Level 3 inputs such
 
as estimates of future cash flows which
 
aligns to the Company’s
 
best estimate of
future
 
market
 
and
 
operating
 
conditions,
 
including
 
its
 
current
 
life
 
of
 
mine
 
plan.
 
The
 
life
 
of
 
mine
 
plan
 
includes
assumptions in relation to coal price
 
forecasts, projected mine production volumes, operating costs, capital costs
and discount rate.
Sale of the Amonate Mining Asset
On
December 2, 2021
,
 
the
 
Company
 
sold
 
Amonate,
 
including
 
related
 
assets
 
and
 
liabilities,
 
to
 
Ramaco
Resources, Inc., a Delaware corporation,
 
for a purchase price of $
30.0
 
million and realized a pre-tax
 
net gain of
$
14.8
 
million after transaction costs of $
2.6
 
million, included within “Gain on disposal of
 
asset held for sale” in the
Company’s
 
Consolidated
 
Statement
 
of Operations
 
and
 
Comprehensive
 
Income for
 
the year
 
ended December
31, 2021.
5. Impairment of Assets
The Company concluded
 
that no impairment
 
charges were
 
required at any
 
of the Company’s
 
mining assets
 
for
the years ended December 31, 2022 and 2021.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
136
During the year ended
 
December 31, 2020, the
 
Company performed an
 
impairment assessment in
 
accordance
with ASC 360 – Property, Plant and Equipment, and determined that the
 
sum of the estimated undiscounted pre-
tax future
 
cash flows
 
of Greenbrier
 
long-lived assets
 
exceeded its
 
carrying amount.
 
As a
 
result, an
 
impairment
charge of $
78.1
 
million was recorded,
 
reducing the
 
carrying amount
 
of Greenbrier’s
 
long-lived assets
 
to its
 
fair
value at that time, which did not include any associated ARO
 
liabilities.
6.
 
Other, net
Other, net consists of the following:
Year Ended December 31,
 
(US$ thousands)
2022
2021
2020
Other foreign exchange gains (losses)
(1)
$
32,259
$
(7,049)
$
(1,175)
Other income
1,536
862
567
Total
 
Other, net
$
33,795
$
(6,187)
$
(608)
(1)
 
Other foreign
 
exchange gains
 
(losses) primarily
 
relates to
 
gains and
 
losses recognized
 
on the
 
translation of
short-term
 
inter-entity
 
balances
 
between
 
certain
 
entities
 
within
 
the
 
Group
 
that
 
are
 
denominated
 
in
 
currencies
other than their respective functional currencies.
7.
 
Capital Structure
(a)
 
Stockholders’ Equity
Authorized capital stock
The Company’s Articles of Incorporation, as amended, authorize the Company to issue
1,100,000,000
 
shares of
$
0.01
 
par value
 
capital stock
 
consisting of
1,000,000,000
 
shares of
 
common stock
 
and
100,000,000
 
shares of
preferred stock.
Common Stock / CDIs
The
 
common
 
stock
 
is
 
publicly
 
traded
 
on
 
the
 
ASX
 
under
 
the
 
ticker
 
“CRN,”
 
in
 
the
 
form
 
of
 
CHESS
 
Depositary
Interests (“CDIs). CDIs are units
 
of beneficial ownership in shares
 
of common stock held by
 
CHESS Depositary
Nominees Pty Limited (“CDN”), a wholly-owned subsidiary
 
of ASX Limited, the company that operates the ASX.
As each CDI represents one tenth of a share,
 
holders of CDIs will be entitled to
one
 
vote for every
10
 
CDIs they
hold. CDI
 
holders
 
are to
 
receive
 
entitlements
 
which attach
 
to underlying
 
shares
 
such as
 
participation
 
in rights
issues, bonus issues, capital reductions and liquidation preferences.
The CDIs entitle
 
holders to dividends,
 
if any, and other rights
 
economically equivalent to
 
shares of common
 
stock,
including the right
 
to attend stockholders’
 
meetings. CDN, as
 
the stockholder of
 
record, will vote
 
the underlying
shares in accordance with the directions of the CDI holders.
The following table summarizes Common Stock activity
 
during the periods presented below:
Year Ended December 31,
 
2022
2021
2020
Shares outstanding at the beginning of the year
167,645,373
138,387,890
96,651,692
Shares issued during the year
-
29,257,483
41,736,198
Shares outstanding at the end of the year
167,645,373
167,645,373
138,387,890
Coronado Group LLC
As
 
of
 
December
 
31,
 
2022,
 
Coronado
 
Group
 
LLC,
 
the
 
Company’s
 
controlling
 
stockholder,
 
beneficially
 
owns
845,061,399
 
CDIs (representing a beneficial interest
 
in
84,506,140
 
shares of common stock) representing
50.4
%
of
 
the
 
total
1,676,453,730
 
CDIs
 
(representing
 
a
 
beneficial
 
interest
 
in
167,645,373
 
shares
 
of
 
common
 
stock)
outstanding.
 
The
 
remaining
831,392,331
 
CDIs
 
(representing
 
a
 
beneficial
 
interest
 
in
83,139,233
 
shares
 
of
common stock) are owned by investors in the form of CDIs
 
publicly traded on the ASX.
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
137
Refer to Note 23 “Stock-Based Compensation” for
 
options to purchase common stock issued
 
and outstanding as
of December 31, 2022 and 2021.
Preferred Stock
Coronado Group
 
LLC holds
 
one share
 
of preferred
 
stock
 
Series A.
 
The holder
 
of Series
 
A Preferred
 
Stock
 
is
permitted
 
to
 
nominate
 
and
 
elect
 
members
 
of
 
the
 
Company’s
 
Board
 
of
 
Directors
 
in
 
relation
 
to
 
the
 
level
 
of
 
the
holder’s
 
aggregate
 
beneficial
 
ownership
 
of
 
shares
 
of
 
the
 
Company’s
 
common
 
stock.
 
The
 
Series
 
A
 
Preferred
Share
 
is
 
not
 
entitled
 
to
 
dividends
 
and
 
is
 
non
 
transferable.
 
The
 
Series
 
A
 
Preferred
 
Share
 
has
 
a
 
liquidation
preference of $
1.00
.
(b)
 
Dividends
The dividend
 
policy
 
and
 
the
 
payment
 
of future
 
cash
 
dividends
 
are subject
 
to
 
the
 
discretion
 
of the
 
Company’s
Board of Directors.
During the year ended December 31, 2022, the Company declared:
•
 
Dividends of $
150.9
 
million, or $
0.09
 
per CDI ($
0.90
 
per share of common stock), on February 24, 2022;
•
 
Dividends of $
200.1
 
million, or $
0.119
 
per CDI ($
1.19
 
per share of common stock), on May 9, 2022;
 
•
 
Dividends of $
125.7
 
million, or $
0.075
 
per CDI ($
0.75
 
per share of
 
common stock),
 
on August 8,
 
2022;
and
•
 
Dividends of $
225.0
 
million, or $
0.134
 
per CDI ($
1.34
 
per share of common stock), on
 
October 30, 2022.
The
 
Company
 
paid
 
a
 
total
 
of
 
$
700.2
 
million
 
to
 
stockholders
 
and
 
CDI
 
holders
 
on
 
the
 
ASX,
 
net
 
of
 
$
1.4
 
million
foreign exchange gain
 
on payment of
 
dividends to certain
 
CDI holders that
 
elected to be
 
paid in Australian
 
dollars,
in relation to the above declared dividends.
 
During the year ended December 31, 2021, the Company did
 
not declare or pay dividends.
During the year
 
ended December 31,
 
2020, the Company
 
declared a dividend
 
to stockholders and
 
CDI holders
on the
 
ASX of
 
$
24.2
 
million, or
 
$
0.025
 
per CDI
 
($
0.25
 
per share
 
of common
 
stock). The
 
dividend was
 
paid on
March 31, 2020.
 
(c)
 
Earnings per Share
Basic earnings per
 
share of common
 
stock is computed
 
by dividing net
 
income attributable
 
to the Company
 
for
the period,
 
by the
 
weighted-average
 
number of
 
shares
 
of common
 
stock outstanding
 
during the
 
same period.
Diluted earnings per share of common stock is computed
 
by dividing net income attributable to the Company
 
by
the weighted-average number
 
of shares
 
of common
 
stock outstanding adjusted
 
to give
 
effect to potentially
 
dilutive
securities. During periods in which the Company incurs
 
a net loss, diluted weighted average shares outstanding
are equal to basic weighted average shares outstanding
 
because the effect of all equity awards is anti-dilutive.
Basic and diluted earnings per share was calculated as
 
follows (in thousands, except per share data):
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
138
Year Ended December 31,
(US$ thousands, except per share data)
2022
2021
2020
Numerator:
Net income (loss)
$
771,703
$
189,423
$
(226,537)
Less:
 
Net (loss) attributable to Non-controlling interest
—
(2)
(69)
Net income (loss) attributable to Company stockholders
$
771,703
$
189,425
$
(226,468)
Denominator (in thousands):
Weighted-average shares of common stock outstanding
167,645
156,710
111,073
Effects of dilutive shares
201
132
—
Weighted average diluted shares of common stock
 
outstanding
167,846
156,842
111,073
Earnings (Loss) Per Share (US$):
Basic
4.60
1.21
(2.04)
Dilutive
4.60
1.21
(2.04)
8. Trade Receivables, net
The Company
 
extends trade
 
credit to
 
its customers
 
in the
 
ordinary course
 
of business.
 
Trade
 
receivables are
recorded initially at fair value and subsequently at amortized
 
cost, less any ECL.
December 31,
(US$ thousands)
2022
2021
Trade
 
receivables - at amortized cost
$
414,490
$
272,657
Provision for discounting and credit losses (Note 9)
(4,511)
(734)
Trade receivables, net
$
409,979
$
271,923
Xcoal
At December
 
31, 2022,
 
amounts
 
outstanding from
 
Xcoal in
 
respect
 
of coal
 
sales
 
were $
69.8
 
million,
 
of which
$
34.9
 
million were past due, and is included within “Trade
 
receivables, net” on the Consolidated Balance
 
Sheet.
Subsequent to December
 
31, 2022, the Company has collected
 
the Xcoal past due balance in
 
full. The carrying
amount
 
of
 
trade
 
receivables
 
from
 
Xcoal,
 
net
 
of
 
provision
 
for
 
discounting
 
and
 
credit
 
losses
 
of
 
$
2.9
 
million,
recognized due to the uncertainty surrounding expected timing
 
of collection, was $
65.7
 
million.
At December
 
31,
 
2021, amounts
 
outstanding
 
from
 
Xcoal in
 
respect
 
of coal
 
sales
 
were $
35.2
 
million,
 
of which
$
17.9
 
million
 
was
 
past due
 
and was
 
included
 
in “Trade
 
receivables,
 
net” on
 
the
 
Consolidated
 
Balance Sheet.
Subsequent to December 31,
 
2021, the Company collected
 
Xcoal’s past due balance in
 
full. The carrying amount
of
 
trade
 
receivables
 
from
 
Xcoal,
 
net
 
of
 
provision
 
for
 
discounting
 
and
 
credit
 
losses
 
of
 
$
0.4
 
million,
 
was
 
$
34.8
million.
9. Provision for Discounting and Credit Losses
The following
 
table provides
 
the reconciliation
 
of the
 
allowance for
 
credit losses
 
that is
 
deducted from
 
financial
assets to present the net amount expected to be collected:
(US$ thousands)
Trade and
related party
trade
receivables
Other
Assets
Total
As at January 1, 2021
$
9,298
$
—
$
9,298
Change in estimates during the current period
436
522
958
Unwind of provision for discounting and credit losses
(9,000)
—
(9,000)
As at December 31, 2021
734
522
1,256
Change in estimates during the current period
3,777
44
3,821
As at December 31, 2022
$
4,511
$
566
$
5,077
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
139
10. Inventories
 
December 31,
(US$ thousands)
2022
2021
Raw coal
$
50,604
$
17,334
Saleable coal
45,913
42,006
Total
 
coal inventories
96,517
59,340
Supplies inventory
61,501
59,582
To
tal inventories
$
158,018
$
118,922
Coal inventories measured at its net realizable value were
 
$
5.0
 
million and $
2.2
 
million at December 31, 2022
and 2021, respectively,
 
and relates to coal designated for deliveries under the Stanwell
 
non-market coal supply
agreement. See further discussion in Note 19 “Contract
 
Obligations”.
11.
 
Property, Plant and
 
Equipment
The following
 
table indicates
 
the carrying
 
amount of
 
each of
 
the major
 
classes of
 
the Company’s
 
consolidated
depreciable assets:
December 31,
 
(US$ thousands)
2022
2021
Land
$
27,711
$
27,853
Buildings and improvements
91,336
88,079
Plant, machinery, mining
 
equipment and transportation vehicles
1,012,844
963,272
Mineral rights and reserves
373,309
374,326
Office and computer equipment
9,488
8,718
Mine development
565,106
566,201
Asset retirement obligation asset
87,877
75,215
Construction in process
82,713
42,055
To
tal cost of property,
 
plant and equipment
2,250,384
2,145,719
Less accumulated depreciation, depletion and amortization
860,836
748,356
Property, plant and
 
equipment, net
$
1,389,548
$
1,397,363
The amount of depreciation and amortization expense
 
for property, plant
 
and equipment for the years ended
December 31, 2022, 2021 and 2020 was $
155.8
million, $
166.2
 
million and $
187.7
 
million, respectively.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
140
12.
 
Goodwill and Other Intangible Assets
(a)
 
Acquired Intangible Assets
December 31, 2022
(US$ thousands)
Weighted
average
amortization
period (years)
Gross
carrying
amount
Accumulated
amortization
Net carrying
amount
Intangible assets:
Amortizing intangible assets:
Mining permits - Logan
15
$
1,642
$
990
$
652
Mining permits - Buchanan
28
3,501
842
2,659
Total
 
intangible assets
$
5,143
$
1,832
$
3,311
December 31, 2021
(US$ thousands)
Weighted
average
amortization
period (years)
Gross
carrying
amount
Accumulated
amortization
Net carrying
amount
Intangible assets:
Amortizing intangible assets:
Mining permits - Logan
15
$
1,642
$
912
$
730
Mining permits - Buchanan
28
3,501
717
2,784
Total
 
intangible assets
$
5,143
$
1,629
$
3,514
Amortization expense is charged using the
 
straight-line method over the useful
 
lives of the respective intangible
asset.
 
The
 
aggregate
 
amount
 
of
 
amortization
 
expense
 
for
 
amortizing
 
intangible
 
assets
 
for
 
the
 
years
 
ended
December
 
31,
 
2022,
 
2021
 
and
 
2020,
 
were
$
0.2
 
million,
 
$
0.2
 
million
 
and
 
$
0.2
 
million,
 
respectively.
 
Estimated
amortization expense for each of the next five years is
 
$
0.2
 
million.
(b)
Goodwill
In connection with the
 
Buchanan acquisition on
 
March 31, 2016, the Company
 
recorded goodwill in the
 
amount
of $
28.0
 
million. The
 
Company performed
 
a qualitative
 
assessment to
 
determine if
 
impairment was
 
required at
December 31, 2022
 
or 2021.
 
Based upon
 
the Company’s
 
qualitative assessment,
 
it is more
 
likely than
 
not that
the fair
 
value
 
of the
 
reporting
 
unit is
 
greater
 
than
 
the
 
carrying
 
amount at
 
December 31,
 
2022 and
 
2021. As
 
a
result,
no
 
impairment
 
was
 
recorded,
 
and
 
the
 
balance
 
of
 
goodwill
 
at
 
both
 
December 31,
 
2022
 
and
 
2021
was
$
28.0
 
million. The Company has not noted any indicators
 
of impairment since the acquisition date.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
141
13.
 
Other Assets
 
December 31,
(US$ thousands)
2022
2021
Other current assets:
 
Prepayments
$
26,831
$
24,226
 
Long service leave receivable
7,884
9,136
 
Tax
 
credits receivable
4,183
4,440
 
Other
21,290
9,845
Total
 
other current assets
$
60,188
$
47,647
Other non-current assets:
 
Favorable mineral leases
$
3,448
$
3,645
 
Deferred debt issue costs
 
2,463
4,310
 
Long service leave receivable
585
550
 
Tax
 
credits receivable
7,269
11,223
 
Deposits to acquire long lead capital items
18,126
—
 
Other
1,694
—
Total
 
other non-current assets
$
33,585
$
19,728
The Company
 
has other assets
 
which includes prepayments,
 
favorable mineral leases,
 
deferred debt issue
 
costs,
long service leave receivable,
 
equipment deposits and coalfield employment enhancement tax credit receivable.
 
The favorable mineral leases are amortized based on the coal tonnage removed from the lease property relative
to the total estimated reserves on that property.
 
Long service leave for
 
eligible coal mine workers
 
at the Company’s
 
Australian Operations is
 
paid when leave is
taken, with a subsequent
 
reimbursement received from
 
the Coal Mining Industry
 
(Long Service Leave Funding)
Corporation
 
in
 
Queensland,
 
Australia.
 
The
 
reimbursement
 
entitlement
 
is
 
recognized
 
as
 
a
 
receivable
 
and
 
is
measured as
 
the present
 
value of
 
expected future
 
reimbursements to
 
be received
 
for the
 
corresponding leave
liability recognized.
 
The deferred
 
issue costs
 
as of
 
December
 
31,
 
2022 and
 
2021,
 
were
 
incurred to
 
establish
 
the ABL
 
Facility (as
described in Note 17
 
“Interest Bearing Liabilities”) and
 
amortized over the life
 
of the facility
 
on a straight-line
 
basis
and
 
included
 
in
 
“Interest
 
expense,
 
net”
 
in
 
the
 
Company’s
 
Consolidated
 
Statements
 
of
 
Operations
 
and
Comprehensive Income.
The tax credits receivable relates
 
to the Virginia coalfield employment enhancement tax
 
credit for coal sales from
the Company’s mining properties in the State of West Virginia in the U.S. during the 2018 to 2021 income years.
Where the credits exceed the Company’s state tax liability for the tax year,
 
the excess is redeemable by the Tax
Commissioner on behalf of the Commonwealth of Virginia for
85
% of the face value within 90
 
days after filing the
return. The
 
tax credits
 
allowed can
 
be claimed
 
in the
 
third taxable
 
year following
 
the taxable
 
year in
 
which the
credit was earned and allowed.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
142
14.
 
Accrued Expenses and Other Current Liabilities
Accrued expenses and other current liabilities consist of the
 
following:
December 31,
(US$ thousands)
2022
2021
Wages
 
and employee benefits
$
38,687
$
41,187
Taxes
 
other than income taxes
5,988
6,246
Accrued royalties
117,131
70,237
Accrued freight costs
44,496
27,754
Accrued mining fees
103,492
65,835
Acquisition related accruals
11,669
31,201
Other liabilities
22,228
28,482
 
Total
 
accrued expenses and other current liabilities
$
343,691
$
270,942
Acquisition
 
related
 
accruals
 
is
 
an
 
accrual
 
for
 
the
 
remaining
 
estimated
 
stamp
 
duty
 
payable
 
on
 
the
 
Curragh
acquisition of $
11.7
million (A$
17.3
 
million). Refer to Note 28 “Contingencies” for further
 
details.
15. Leases
Information related to Company’s right-of use
 
assets and related lease liabilities are as follows:
Year ended December 31,
(US$ thousands)
2022
2021
Operating lease costs
$
8,088
$
10,863
Cash paid for operating lease liabilities
8,244
10,986
Finance lease costs:
Amortization of right of use assets
304
227
Interest on lease liabilities
20
14
Total
 
finance lease costs
$
324
$
241
December 31,
(US$ thousands)
2022
2021
Operating leases:
Right of use asset – operating leases, net
$
17,385
$
13,656
Finance leases:
Property and equipment
371
404
Accumulated depreciation
(186)
(67)
Property and equipment, net
185
337
Current operating lease obligations
7,593
8,326
Non-current operating lease obligations
15,505
12,685
Total
 
Operating lease liabilities
23,098
21,011
Current finance lease obligations
127
126
Non-current finance lease obligations
68
209
Total
 
Finance lease liabilities
195
335
Current lease obligations
7,720
8,452
Non-current lease obligations
15,573
12,894
Total
 
lease obligations
$
23,293
$
21,346
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
143
December 31,
2022
2021
Weighted Average Remaining
 
Lease Term (Years)
Weighted average remaining lease term – finance
 
leases
1.52
2.54
Weighted average remaining lease term – operating
 
leases
4.11
2.59
Weighted Average Discount
 
Rate
Weighted discount rate – finance lease
7.60%
7.60%
Weighted discount rate – operating lease
8.94%
7.95%
The Company’s leases have remaining lease terms of
1 year
 
to
5 years
, some of which include
 
options to extend
the terms deemed reasonable to exercise. Maturities of lease
 
liabilities are as follows:
(US$ thousands)
Operating
Lease
Finance
Lease
Year ending
 
December 31,
2023
$
8,964
$
138
2024
6,112
138
2025
5,325
69
2026
5,214
—
Thereafter
1,139
—
Total
 
lease payments
26,754
345
Less imputed interest
(3,656)
(150)
Total
 
lease liability
$
23,098
$
195
16.
 
Asset Retirement Obligations
Reclamation of
 
areas disturbed
 
by mining
 
operations
 
must be
 
performed
 
by the
 
Company in
 
accordance
 
with
approved
 
reclamation
 
plans
 
and
 
in
 
compliance
 
with
 
state
 
and
 
federal
 
laws
 
in
 
the
 
states
 
of
 
West
 
Virginia
 
and
Virginia
 
in
 
the
 
United
 
States
 
and
 
Queensland
 
in
 
Australia.
 
For
 
areas
 
disturbed,
 
a
 
significant
 
amount
 
of
 
the
reclamation will take place in
 
the future when operations cease. There
 
were
no
 
assets that were legally restricted
for
 
purposes
 
of
 
settling
 
asset
 
retirement
 
obligations
 
as
 
of
 
December
 
31,
 
2022
 
and
 
2021.
 
In
 
addition,
 
state
agencies monitor compliance with the mine plans, including reclamation.
The Company records the fair value
 
of its asset retirement obligations using the present
 
value of projected future
cash flows, with
 
an equivalent amount
 
recorded in the
 
related long lived
 
asset or a
 
change to the
 
Consolidated
Statements of Operations
 
if the related
 
permit is closed.
 
An accretion cost,
 
representing the
 
increase over time
in the present value of
 
the liability, is recorded each period and the capitalized cost is
 
depreciated over the useful
life of the related asset. As reclamation work is performed or liabilities
 
otherwise settled, the recorded amount of
the liability is reduced.
Changes in
 
the asset
 
retirement obligations
 
for the
 
years ended
 
December 31,
 
2022 and
 
December 31,
 
2021
were as follows:
(US$ thousands)
December 31,
2022
December 31,
2021
Total
 
asset retirement obligations at beginning of the year
$
120,277
$
122,144
ARO liability additions
1,835
1,642
Accretion
9,066
9,353
Reclamation performed in the year
(3,270)
(3,322)
Gain on settlement of ARO
(53)
(601)
Change in estimate recorded to net income
(2)
1,195
Change in estimate recorded to assets
15,381
(5,444)
Foreign currency translation adjustment
(4,744)
(4,690)
Total
 
Asset retirement obligations at end of the year
138,490
120,277
Less current portion
(10,646)
(9,414)
Asset retirement obligation, excluding current portion
$
127,844
$
110,863
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
144
17.Interest Bearing Liabilities
The following is a summary of interest-bearing liabilities
 
at December 31, 2022:
 
(US$ thousands)
December 31,
2022
December 31,
2021
Weighted Average
Interest Rate at
December 31, 2022
Final
Maturity
10.75
% Senior Secured Notes
$
242,326
$
315,000
12.14
%
(2)
2026
ABL Facility
—
—
2024
Discount and debt issuance costs
(1)
(9,373)
(14,831)
Total
 
interest bearing liabilities
$
232,953
$
300,169
(1)
Deferred debt issuance
 
costs incurred on
 
the establishment of the
 
ABL Facility has been
 
included within "Other non-current
 
assets" on the
Consolidated Balance Sheets.
(2)
 
Represents the effective interest rate.
 
Senior Secured Notes
On May 12, 2021,
 
the Company entered
 
into an indenture, or
 
the Indenture, among
 
Coronado Finance Pty Ltd,
an Australian proprietary company,
 
as the issuer or the Australian Borrower, the Company,
 
as parent guarantor,
the other
 
guarantors
 
party
 
thereto
 
and
 
Wilmington
 
Trust,
 
National
 
Association,
 
as trustee,
 
and
 
as priority
 
lien
collateral trustee, relating to the issuance of
10.750
% Senior Secured Notes due 2026, or the Notes.
Interest on
 
the Notes
 
is payable
 
semi-annually in
 
arrears on
 
May 15
 
and November
 
15 of
 
each year
 
to record
holders of the Notes on the immediately preceding May
 
1 and November 1, as applicable. The Notes mature
 
on
May 15, 2026
 
and are senior secured obligations of the Company.
The Notes are guaranteed
 
on a senior secured
 
basis by the Company
 
and its wholly-owned
 
subsidiaries (other
than
 
the
 
Issuer)
 
(subject
 
to
 
certain
 
exceptions
 
and
 
permitted
 
liens)
 
and
 
secured
 
by
 
(i)
 
a
 
first-priority
 
lien
 
on
substantially all of the Company’s assets and the assets of the other
 
Guarantors (other than accounts receivable
and other rights to payment,
 
inventory,
 
intercompany indebtedness, certain
 
general intangibles and commercial
tort claims, commodities accounts, deposit accounts, securities accounts and other related assets and proceeds
and
 
products
 
of
 
each
 
of
 
the
 
foregoing,
 
or,
 
collectively,
 
the
 
ABL
 
Collateral),
 
or
 
the
 
Notes
 
Collateral,
 
and
 
(ii)
 
a
second-priority lien on the ABL Collateral, which is
 
junior to a first-priority lien, for the
 
benefit of the lenders under
the Company’s
 
senior secured
 
asset-based revolving
 
credit agreement
 
in an
 
initial aggregate
 
principal amount
of $
100.0
 
million, or the ABL Facility.
The terms
 
of the
 
Notes are
 
governed
 
by the
 
Indenture.
 
The Indenture
 
contains
 
customary covenants
 
for high
yield bonds, including,
 
but not limited
 
to, limitations on
 
investments, liens, indebtedness,
 
asset sales, transactions
with affiliates and
 
restricted payments, including
 
payment of dividends
 
on capital
 
stock. As of
 
December 31, 2022,
the Company was in compliance with all applicable covenants
 
under the Indenture.
The Company may
 
redeem some or
 
all of the
 
Notes at the
 
redemption prices and
 
on the terms
 
specified in the
Indenture.
Partial Redemption of Notes
On November
 
23, 2022,
 
the Company
 
exercised its
 
optional redemption
 
rights and
 
redeemed $
35.0
 
million, or
10.0
%, of the
 
original aggregate principal amount
 
of its Notes
 
at a redemption
 
price equal to
103
% of the
 
principal
amount of the Notes, plus accrued and unpaid interest on
 
the Notes to, but not including, the date
 
of redemption.
 
The redemption
 
allocation was
 
determined by
 
lot, in
 
compliance with
 
the requirements
 
of the
 
Depository Trust
Company as provided in the Indenture governing the
 
Notes.
 
During the
 
year ended
 
December 31,
 
2022, in
 
connection
 
with the
 
dividends paid
 
in the
 
period, the
 
Company
offered to
 
purchase the
 
Notes pursuant
 
to the
 
terms of
 
the Indenture.
 
In connection
 
with the
 
above offers,
 
the
Company purchased an
 
aggregate principal amount, for
 
accepted offers, of
 
$
37.7
 
million at a
 
price equal to
104
%
of the principal amount of the
 
Notes, plus accrued and unpaid interest on
 
the Notes to, but not including, the
 
date
of redemption.
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
145
In connection to the above redemptions,
 
the Company recorded a “Loss
 
on debt extinguishment” of $
5.3
 
million
in the
 
Consolidated Statement
 
of Operations
 
and Comprehensive
 
Income, which
 
represents the
 
premium paid
and a portion of unamortized debt issuance costs and
 
discount on issuance.
 
ABL Facility
On
 
May
 
12,
 
2021,
 
the
 
Company,
 
Coronado
 
Coal
 
Corporation,
 
a
 
Delaware
 
corporation
 
and
 
wholly-owned
subsidiary of the
 
Company,
 
or the U.S.
 
Borrower,
 
the
 
Australian Borrower and
 
the guarantors
 
entered into the
ABL
 
Facility
 
agreement
 
with
 
Citibank,
 
N.A.,
 
as
 
administrative
 
agent
 
and
 
a
 
lender,
 
and
 
various
 
other
 
financial
institutions, with an aggregate multi-currency lender
 
commitment of up to
 
$
100.0
 
million, including a $
30.0
 
million
sublimit for the issuance of
 
letters of credit and $
5.0
 
million for swingline loans,
 
at any time outstanding, subject
to borrowing base availability.
 
The ABL Facility matures on
May 12, 2024
.
 
Revolving loan
 
(and letter
 
of credit)
 
availability under
 
the ABL
 
Facility is
 
subject to
 
a borrowing
 
base, which
 
at
any time is equal to the sum of certain
 
eligible accounts receivable, certain eligible
 
inventory and certain eligible
supplies
 
inventories
 
and,
 
in
 
each
 
case,
 
subject
 
to
 
specified
 
advance
 
rates.
 
The
 
borrowing
 
base
 
is
 
subject
 
to
certain reserves, which may be established
 
by the agent in its
 
reasonable credit discretion, that could reasonably
be expected to have an adverse effect on the value
 
of the collateral included in the borrowing base.
Borrowings
 
under
 
the
 
ABL
 
Facility
 
bear
 
interest
 
at
 
a
 
rate equal
 
to
 
a
 
BBSY
 
rate
 
plus an
 
applicable
 
margin.
 
In
addition to paying
 
interest on the
 
outstanding borrowings
 
under the ABL
 
Facility,
 
the Company is
 
also required
to pay a fee in respect of unutilized commitments, on amounts available to be drawn under outstanding letters of
credit and certain
 
administrative fees.
The
 
obligations
 
of
 
the
 
borrowers
 
under
 
the
 
ABL
 
Facility
 
are
 
guaranteed
 
by
 
(a)
 
a
 
first
 
priority-lien
 
in
 
the
 
ABL
Collateral, (b)
 
a second
 
priority-lien
 
in
 
the Notes
 
Collateral
 
and (c)
 
solely in
 
the
 
case
 
of the
 
obligations
 
of the
Australian Borrower,
 
a featherweight
 
floating security
 
interest over
 
certain accounts
 
released from
 
the security
by the Australian Borrower in favor of Stanwell.
The ABL Facility contains customary covenants for
 
asset-based credit agreements of this type, including, among
others: (i) the requirement to deliver
 
financial statements, other reports and
 
notices; (ii) covenants related to the
payment of dividends on, or purchase or redemption
 
of, capital stock; (iii) covenants related to
 
the incurrence or
prepayment of
 
certain debt;
 
(iv) covenants
 
related to
 
the incurrence
 
of liens
 
or encumbrances;
 
(v) compliance
with
 
laws;
 
(vi)
 
restrictions
 
on
 
certain
 
mergers,
 
consolidations
 
and
 
asset
 
dispositions;
 
and
 
(vii)
 
restrictions
 
on
certain transactions with affiliates. Subject to customary grace periods and notice requirements, the
 
ABL Facility
also
 
contains
 
customary
 
events
 
of
 
default.
 
Additionally,
 
the
 
ABL
 
Facility
 
contains
 
a
 
springing
 
fixed
 
charge
coverage ratio of not less than
1.00
 
to 1.00, which ratio is tested if availability under
 
the ABL Facility is less than
a certain amount.
 
As of December
 
31, 2022, the
 
Company is
 
not subject to
 
this covenant.
 
As at December
 
31,
2022, the Company met its undertakings under the ABL
 
Facility.
As
 
at
 
December
 
31,
 
2022,
no
 
amounts
 
were
 
drawn
 
and
no
 
letters
 
of
 
credit
 
were
 
outstanding
 
under
 
the
 
ABL
Facility.
The carrying value of
 
debt issuance costs,
 
recorded as “Other
 
non-current assets” in
 
the Consolidated Balance
Sheets, were $
2.5
 
million and $
4.3
 
million at December 31, 2022 and December 31, 2021, respectively. Refer to
Note 13 “Other Assets”.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
146
18.
 
Other Financial Liabilities
The following is a summary of other financial liabilities:
(US$ thousands)
December 31,
2022
December 31,
2021
Collateralized financial liabilities payable to third-party financing
 
companies
(1)
$
12,726
$
17,794
Unsecured notes payable to insurance premium finance company,
 
payable in
aggregate monthly instalments ranging from $
645
 
to $
700
 
with a fixed rate
ranging up to
2.25
% per annum
—
4,536
Total
 
Other financial
 
liabilities
12,726
22,330
Less: current portion
4,458
8,508
Other non-current financial liabilities
$
8,268
$
13,822
(1)
On January
 
6, 2021,
 
the Company
 
entered into
 
an agreement
 
with a
 
third-party financier
 
to sell
 
and leaseback
 
items of
 
property, plant and
 
equipment
owned by
 
Curragh, a
 
wholly-owned subsidiary of
 
the Company.
 
The transaction
 
did not
 
satisfy the
 
sale criteria
 
under ASC
 
606 –
 
Revenues from
Contracts with
 
Customers. As
 
a
 
result, the
 
transaction was
 
deemed a
 
financing arrangement
 
and the
 
Company has
 
continued to
 
recognize the
underlying property,
 
plant and equipment
 
on its Consolidated
 
Balance Sheet. The
 
proceeds received from the
 
transaction of $
23.5
 
million (A$
30.2
million) were recognized as “Other financial
 
liabilities” on the Consolidated Balance Sheet. The
 
term of the financing arrangement
 
ranges up to
five
years
 
with an implied interest rate
 
of up to
8.1
% per annum. The carrying
 
amount of this financial liability, net of issuance
 
costs, was $
12.7
million and
$
17.8
 
million as at December 30, 2022 and 2021,
 
$
4.5
 
million and $
4.0
 
million of which were classified as a current liability, respectively.
19.
 
Contract Obligations
In
 
connection
 
with
 
the
 
acquisition
 
of
 
the
 
Logan
 
assets,
 
the
 
Company
 
assumed
 
certain
 
non-market
 
contracts
related to various
 
coal leases.
 
The non-market
 
coal leases
 
require royalty
 
payments based on
 
a percentage
 
of
the
 
realization
 
from
 
the
 
sale
 
of
 
the
 
respective
 
coal
 
under
 
lease.
 
On
 
acquisition,
 
the
 
Company
 
recorded
$
27.3
 
million related to the non-market
 
portion of the coal leases
 
and is amortizing it ratably
 
over the respective
estimated coal reserves as they are mined and sold.
In
 
connection
 
with
 
the
 
acquisition
 
of
 
Curragh,
 
the
 
Company
 
assumed
 
the
 
Stanwell
 
non-market
 
coal
 
supply
agreement
 
(CSA)
 
with
 
a
 
fixed
 
pricing
 
component
 
that
 
was
 
effectively
 
below
 
the
 
market
 
price
 
at
 
the
 
date
 
of
acquisition. As a
 
result, on acquisition,
 
the Company recorded
 
a liability
 
of $
307.0
 
million (A$
400.0
 
million) related
to the
 
unfavorable pricing
 
of the
 
Stanwell CSA
 
and is
 
amortizing it
 
ratably based
 
on the
 
tons sold
 
through the
contract.
 
The
 
amortization
 
of this
 
liability
 
for the
 
year
 
ended December
 
31,
 
2022,
 
2021
 
and
 
2020
 
were
 
$
36.2
million,
 
$
33.7
 
million
 
and
 
$
32.6
 
million,
 
respectively,
 
and
 
recorded
 
as
 
“Other
 
revenues”
 
in
 
the
 
Consolidated
Statements of Operations and Comprehensive Income.
The following is a summary of the contract obligations
 
as of December 31, 2022:
(US$ thousands)
Short-term
Long-term
Total
Coal leases contract liability
$
843
$
19,720
$
20,563
Stanwell below market coal supply agreement
39,500
74,805
114,305
$
40,343
$
94,525
$
134,868
The following is a summary of the contract obligations
 
as of December 31, 2021:
(US$ thousands)
Short-term
Long-term
Total
Coal leases contract liability
$
843
$
20,081
$
20,924
Stanwell below market coal supply agreement
39,118
121,107
160,225
$
39,961
$
141,188
$
181,149
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
147
20.
 
Deferred Consideration Liability
On August 14, 2018 the Company completed the purchase of the Stanwell
 
Reserved Area, or the SRA, adjacent
to
 
the
 
current
 
Curragh
 
mining
 
tenements.
 
This
 
area
 
was
 
acquired
 
on
 
a
 
deferred
 
consideration
 
basis
 
and
 
on
acquisition
 
the
 
Company
 
recognized
 
a
 
“Mineral
 
rights
 
and
 
reserves”
 
asset
 
and
 
a
 
corresponding
 
deferred
consideration liability of $
155.2
 
million (A$
210.0
 
million), calculated using the contractual pre-tax discount rate of
13
% representing
 
fair value
 
of the
 
arrangements
 
at the
 
date of
 
acquisition. The
 
deferred consideration
 
liability
will reflect passage of
 
time changes by way
 
of an annual accretion
 
at the contractual pre-tax discount
 
rate of
13
%
and will
 
be settled
 
as a
 
discount to
 
the price
 
of thermal
 
coal supplied
 
to Stanwell
 
over the
 
term of
 
a new
 
coal
supply agreement which
 
is expected to
 
commence in 2027.
 
The accretion of
 
deferred consideration is recognized
in “Interest expense, net” in the Consolidated Statements of Operations and Comprehensive Income. The Right-
to-mine-asset will be amortized over the coal reserves
 
mined from the SRA.
December 31,
(US$ thousands)
2022
2021
Stanwell Reserved Area deferred consideration
$
243,191
$
230,492
$
243,191
$
230,492
21.
 
Workers’ Compensation and Pneumoconiosis (“Black
 
Lung”) Obligations
In
 
the
 
United
 
States,
 
coal
 
mine
 
operations
 
may
 
lead
 
to
 
traumatic
 
workers
 
compensation
 
claims,
 
as
 
well
 
as
workers’ compensation occupational disease claims for
 
black lung disease. Injured workers generally file claims
for traumatic injury under
 
the governing state
 
workers compensation legislation.
 
Workers may file
 
claims due to
black
 
lung
 
under
 
the
 
governing
 
state
 
workers
 
compensation
 
legislation
 
or
 
under
 
a
 
series
 
of
 
federal
 
laws
 
that
include the Federal Coal Mine Health and Safety Act of 1969, as amended, the Black Lung Benefits Act of 1973,
and
 
the
 
Black
 
Lung
 
Benefits
 
Reform
 
Act
 
of
 
1977.
 
The
 
Company
 
provides
 
for
 
both
 
traumatic
 
workers
compensation claims and occupational disease claims through
 
an insurance policy.
The Company obtained workers
 
compensation insurance for work
 
related injuries, including black
 
lung, through
a
 
third-party
 
commercial
 
insurance
 
company
 
for
 
the
 
years
 
ended
 
December
 
31,
 
2022,
 
2021
 
and
 
2020.
 
The
insurance policy
 
covers claims
 
that exceed
 
$
0.5
 
million per
 
occurrence for
 
all years,
 
or aggregate
 
claims in
 
excess
of $
22.7
million, $
22.0
 
million and $
15.0
 
million for policy years ending May 2023, May 2022 and May 2021. Per
the contractual agreements, the Company
 
was required to provide a collateral
 
deposit of $
53.1
 
million for policy
years 2017 through
 
2023, ending May 31,
 
2023, which is
 
accomplished through providing
 
a combination of
 
letters
of credit and cash collateral
 
in an escrow account.
As of December 31,
 
2022, the Company has
 
provided $
16.8
million of letters
 
of credit, $
27.1
million of cash
 
collateral and surety
 
bonds of $
6.0
 
million totaling $
49.9
 
million.
The remaining collateral is required to be provided by
 
March 31, 2023.
For the
 
years ended
 
December 31, 2022,
 
2021 and
 
2020, the
 
audited Consolidated
 
Statements of
 
Operations
and
 
Comprehensive
 
Income
 
included
 
Company
 
incurred
 
claims,
 
premium
 
expenses
 
and
 
administrative
 
fees
related
 
to
 
worker’s
 
compensation
 
benefits
 
of
 
$
12.2
million,
 
$
12.2
 
million
 
and
 
$
9.5
 
million,
 
respectively.
 
As
 
of
December 31, 2022 and 2021, the estimated workers’ compensation
 
liability was $
30.1
million and $
29.7
 
million,
respectively, representing claims incurred but not paid based on
 
the estimate of the
 
outstanding claims under the
coverage
 
limits
 
and
 
the
 
actuarially
 
determined
 
retained
 
liability
 
under
 
the
 
aggregate
 
claim
 
amount.
 
As
 
of
December
 
31,
 
2022
 
and
 
2021,
 
$
27.1
million
 
and
 
$
25.3
 
million,
 
respectively,
 
are
 
recorded
 
within
 
“Other
 
non-
current liabilities” in the Consolidated Balance Sheets.
 
The current portion of the Company’s estimated
 
workers’
compensation liabilities are
 
recorded within “Accrued
 
expenses and other
 
current liabilities” in the
 
Consolidated
Balance Sheets.
22.
 
Employee Benefit Plans
The
 
Company
 
has
 
a
 
401(k)-defined
 
contribution
 
plan
 
in
 
which
 
all
 
U.S.
 
full
 
time
 
employees
 
are
 
eligible
 
to
participate
 
upon
 
their
 
date
 
of
 
hire.
 
Employees
 
generally
 
may
 
contribute
 
up
 
to
100
%
 
of
 
their
 
qualifying
compensation
 
subject
 
to
 
statutory
 
limitations.
 
The
 
Company
 
matches
 
up
 
to
100
%
 
up
 
to
 
the
 
first
4
%
 
of
 
the
participant’s annual compensation
 
for all employees except
 
for those employed at Buchanan.
 
For employees at
Buchanan,
 
the
 
Company
 
matches
 
up
 
to
100
%
 
of
 
the
 
first
6
%
 
of
 
the
 
participant’s
 
annual
 
compensation.
 
The
Company’s contributions immediately
 
vest. Total Company contributions
 
for the
 
years ended
 
December 31,
 
2022,
2021 and 2020 amounted to $
3.9
 
million, $
3.3
 
million and $
2.7
 
million, respectively.
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
148
In the United States, the Company is self-insured for
 
employee health care claims up to the lesser of $
0.2
 
million
per
 
covered
 
person
 
or
 
an
 
aggregate
 
amount
 
depending
 
on
 
the
 
various
 
coverages
 
provided
 
to
 
employees
throughout the plan year
 
for all employees. The Company
 
has purchased coverage from a
 
commercial insurance
carrier to provide for any claims
 
in excess of these amounts. At December
 
31, 2022 and 2021, the Company had
provided
 
accruals
 
of
 
$
1.9
 
million
 
and
 
$
1.7
 
million,
 
respectively,
 
for
 
claims
 
incurred
 
but
 
not
 
paid
 
based
 
on
management’s estimate
 
of the Company’s
 
self-insured liability.
 
For the years
 
ended December
 
31, 2022, 2021
and 2020, the Company incurred claims,
 
premium expenses and administrative
 
fees related to this plan totaling
$
29.8
 
million, $
25.8
 
million and $
23.9
 
million respectively.
23.
 
Stock-Based Compensation
Total
 
stock-based
 
compensation
 
expense
 
was
 
$
2.7
 
million,
 
$
0.5
 
million
 
and
 
$
1.6
 
million
 
for
 
the
 
years
 
ended
December 31,
 
2022,
 
2021
 
and
 
2020
 
respectively,
 
and
 
was
 
included
 
as
 
a
 
component
 
of
 
selling,
 
general,
 
and
administrative expenses in the Company’s Consolidated Statements of Operations and Comprehensive Income.
The stock-based compensation expense includes
 
compensation expense recognized in full
 
at the grant date for
employees that meet certain retirement eligibility criteria
 
per the 2018 Plan (as defined below).
As
 
of
 
December 31,
 
2022
 
the
 
Company
 
had
 
$
4.1
 
million
 
of
 
total
 
unrecognized
 
compensation
 
cost
 
related
 
to
nonvested stock-based
 
compensation awards
 
granted under
 
the plans.
 
This cost
 
is expected to
 
be recognized
over
3.25
 
years
 
with
 
a
 
weighted-average
 
period
 
of
2.38
 
years
 
as
 
stock-based
 
compensation
 
expense.
 
This
expected cost does not include the impact of any future stock-based
 
compensation awards.
a) 2018 Equity Incentive Plan
In
 
connection
 
with
 
the
 
completion
 
of
 
the
 
Company’s
 
initial
 
public
 
offering
 
of
 
common
 
stock,
 
the
 
Company
implemented
 
the
 
Coronado
 
Global
 
Resources Inc.
 
2018
 
Equity
 
Incentive
 
Plan,
 
or
 
the
 
2018
 
Plan,
 
which
 
is
designed
 
to
 
align
 
compensation
 
for
 
certain
 
key
 
executives
 
with
 
the
 
performance
 
of
 
the
 
Company.
 
Since
 
its
approval, there have been no updates to the 2018 Plan
 
or issuance of a new plan.
 
The 2018
 
Plan provides
 
for the
 
grant of
 
awards
 
including stock
 
options,
 
or Options;
 
stock appreciation
 
rights;
restricted stock
 
units, or
 
RSUs; and
 
restricted stock,
 
valued in
 
whole or
 
in part
 
with reference
 
to shares
 
of the
Company’s CDIs or common stock, as well as performance-based awards, including performance stock units,
 
or
PSUs, denominated in CDIs or shares
 
of common stock. Each award
 
is entitled to receive one
 
CDI with
ten
 
CDIs
representing one share of common stock.
The Company
 
measures the cost
 
of all stock-based
 
compensation, including
 
stock options,
 
at fair value
 
on the
grant date
 
and recognizes
 
such costs
 
within “Selling,
 
general and
 
administrative expense”
 
in the
 
Consolidated
Statements of
 
Operations and Comprehensive
 
Income. The
 
Company recognizes compensation
 
expense related
to Options, PSUs and RSUs
 
that cliff vest using
 
the straight-line method during
 
the requisite service period.
 
For
stock-based
 
awards
 
where
 
vesting
 
is
 
dependent
 
upon
 
achieving
 
certain
 
operating
 
performance
 
goals,
 
the
Company
 
estimates
 
the
 
likelihood
 
of
 
achieving
 
the
 
performance
 
goals
 
during
 
the
 
performance
 
period.
 
The
Company accounts
 
for forfeitures as and when they occur.
All awards require the grantee
 
to be employed by the
 
Company at the vesting date except
 
for grantees who meet
certain retirement criteria under the 2018 Plan.
The following awards were granted under the 2018 Plan:
Grant year
Vesting date
(1)
Performance period
Stock Options
PSUs
RSUs
2022
01/01/2023
not applicable
—
 
—
 
393,793
 
2022
01/07/2023
not applicable
—
 
—
 
255,284
 
2022
01/01/2024
not applicable
—
 
—
 
151,747
 
2022
01/07/2024
not applicable
—
 
—
 
343,210
 
2022
31/03/2026
01/01/2022 - 31/12/2024
—
 
7,471,100
 
—
 
2021
31/03/2025
01/01/2021 - 31/12/2023
—
 
5,998,212
 
—
 
2020
31/03/2024
01/01/2020 - 31/12/2022
—
 
3,203,988
 
—
 
2018
31/03/2023
01/01/2019 - 31/12/2021
1,336,454
 
1,001,914
 
—
 
2018
30/12/2019
not applicable
—
 
—
 
54,687
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
149
(1)
 
The awards shall vest on the one-year anniversary
 
of each testing date and no later than the disclosed date.
 
The Options
 
and PSUs granted
 
that will
 
vest are
 
subject to the
 
achievement of goals
 
over the
 
performance period.
These goals are relative total shareowner return, or TSR, and scorecard performance metrics, or the Scorecard.
TSR is determined based on the Company’s percentile ranking of TSR over the performance period relative to a
predefined comparator group of companies.
Performance metrics applicable to the Options and
 
PSUs granted as summarized below:
Grant year
Relative TSR
Scorecard
TSR
Safety
TSR
Cashflow
Production
Production
2022, 2021 and
2020
33.0%
22.0%
22.0%
22.0%
-
-
2018
25.0%
25.0%
-
-
25.0%
25.0%
Awards subject to
 
TSR vest based
 
on service
 
and market conditions.
 
The fair
 
value of
 
relative TSR was
 
estimated
on the grant date using a Monte Carlo simulation model.
 
Awards subject to Scorecard vest based on service and performance conditions. The fair value of the Scorecard
was estimated
 
on the
 
grant
 
date fair
 
value of
 
the Company’s
 
Common Stock
 
adjusted for
 
dividends foregone
during the performance period.
 
RSUs are only subject to service conditions.
Stock Option Awards
The Company’s 2018 stock option awards were granted
 
on the date of the IPO with an exercise price of $
2.84
per CDI (A$
4.00
 
per CDI) which was equal to the Company’s IPO
 
Price.
The Company’s Stock Option activity is summarized
 
below:
Stock Option Plan Activity
2022
2021
2020
Opening at the beginning of the year
1,015,006
1,083,101
1,292,476
Granted
—
—
—
Forfeited
(833,319)
(68,095)
(209,375)
Outstanding at the end of the year
181,687
1,015,006
1,083,101
Exercisable at the end of the year
—
—
—
2022
2021
2020
Weighted-average remaining contractual term (in
years)
0.25
1.25
2.25
The weighted
 
average
 
grant
 
date
 
fair
 
value
 
of all
 
Option
 
Awards
 
granted
 
was
 
$
0.27
.
 
On August
 
5,
 
2019, the
Board of Directors declared and approved return of
 
capital of $
0.298
 
(A$
0.440
) per CDI. In accordance with ASX
listing rule clause 7.22.3 the exercise price of option
 
awards granted under 2018 plan were reduced by the same
amount
 
as
 
the
 
return
 
of
 
capital
 
to
 
$
2.41
 
(A$
3.56
).
No
 
stock
 
option
 
awards
 
vested
 
during
 
the
 
year
 
ended
December 31, 2022.
The assumptions used to determine the Options fair value
 
on grant date were as follows:
2018 Grant
Expected term of the stock options (in years) (i)
7.22
Dividend yield (ii)
10%
Expected volatility (iii)
35%
Risk-free interest rate (iv)
2.46%
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
150
(i)
 
Expected
 
term
 
represents
 
the
 
period
 
that
 
the
 
Company’s
 
stock-based
 
awards
 
are
 
expected
 
to
 
be
outstanding and is determined using
 
the simplified method, which
 
equates to a weighted average
 
of the
vesting period
 
and total
 
contractual
 
term
 
of the
 
award.
 
All awards
 
cliff vest
 
at the
 
end
 
of the
 
requisite
service period.
(ii)
 
Dividend yield is the expected average yield of dividends
 
expected over the vesting period.
(iii)
 
Expected volatility
 
was estimated
 
using comparable
 
public company’s
 
volatility for
 
similar terms
 
as the
Company
 
does
 
not
 
have
 
a
 
long
 
enough
 
operating
 
period
 
as
 
a
 
public
 
company
 
to
 
estimate
 
its
 
own
volatility.
 
Over
 
time as
 
the
 
Company
 
develops
 
its own
 
volatility
 
history
 
it will
 
begin
 
to
 
incorporate
 
that
history into its expected volatility estimates.
(iv)
 
Risk-free interest
 
rate is based
 
on an interpolated
 
Australian Government
 
Bond Rate
 
at the time
 
of the
grant for periods corresponding with the expected term
 
of the option.
The applicable
 
assumptions in
 
determining the
 
fair value
 
of market
 
and performance
 
conditions of
 
the Options
awards were the same.
Performance Stock Unit Awards
Activity of the Company’s
 
PSUs that are ultimately
 
payable in the Company’s
 
CDIs or the equivalent
 
number of
shares of common stock granted under the 2018 Plan
 
is summarized below:
Performance Stock Units Plan Activity
2022
2021
2020
Nonvested at the beginning of the year
8,501,869
4,002,783
988,721
Granted
7,471,100
5,998,212
3,203,988
Forfeited
(1,114,048)
(1,499,126)
(189,926)
Nonvested at the end of the year
14,858,921
8,501,869
4,002,783
2022
2021
2020
Weighted-average grant date fair value (per CDI)
$
0.53
$
0.43
$
0.79
Weighted-average remaining term (in years)
2.54
2.79
3.01
The weighted
 
average grant
 
date fair
 
value of
 
all PSU
 
Awards granted
 
in 2022
 
was $
0.67
 
(A$
0.89
).
No
 
PSUs
vested during the year ended December 31, 2022.
The assumptions used to determine the PSUs fair value on
 
each grant date were as follow:
2022 Grant
2021 Grant
2020 Grant
2018 Grant
Time to maturity (in years) (i)
3.99
3.85
3.49
4.52
Dividend yield (ii)
16.3%
3.0%
1.6%
10.0%
Expected volatility (iii)
60.0%
60.0%
60.0%
35.0%
Risk-free interest rate (iv)
2.66%
0.35%
0.18%
2.23%
(i)
 
Time to maturity represents the period
 
that the Company’s stock-based
 
awards will vest. All awards cliff
vest at the end of the requisite service period.
(ii)
 
Dividend yield is the expected average yield of dividends
 
expected over the vesting period.
(iii)
 
For the
 
2018 grant,
 
the expected
 
volatility was
 
estimated using
 
comparable public
 
company’s
 
volatility
for similar terms as the Company does not have a long enough operating period
 
as a public company to
estimate
 
its
 
own
 
volatility.
 
For
 
the
 
2020,
 
2021
 
and
 
2022
 
grants,
 
the
 
volatility
 
was
 
estimated
 
using
comparable public company’s volatility and the Company’s
 
own volatility for similar terms.
(iv)
 
Risk-free interest
 
rate is based
 
on an interpolated
 
Australian Government
 
Bond Rate
 
at the time
 
of the
grant for periods corresponding with the expected term
 
of the PSUs.
The above
 
inputs were
 
consistent to
 
determine the
 
fair value
 
of the
 
market and
 
performance conditions
 
of the
PSUs awards.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
151
Restricted Stock Units
During the year ended
 
December 31, 2022,
 
the Company issued
 
RSUs to certain
 
employees. These RSUs
 
are
only subject
 
to service
 
conditions and
 
vest at
 
various intervals
 
during the
 
service
 
period. The
 
fair value
 
of the
award
 
was
 
determined
 
using
 
the
 
market
 
price
 
of
 
the
 
Company’s
 
Common
 
Stock
 
at
 
the
 
date
 
of
 
grant
 
and
compensation expense is recorded over the requisite
 
service period.
 
Activity of the Company’s
 
RSUs that are ultimately
 
payable in the Company’s
 
CDIs or the equivalent
 
number of
shares of common stock granted under the 2018 Plan
 
is summarized below:
Restricted Stock Units Plan Activity
2022
Nonvested at the beginning of the year
—
Granted
1,144,034
Forfeited
—
Vested
—
Nonvested at the end of the year
1,144,034
2022
Weighted-average grant date fair value (per CDI)
$
1.22
Weighted-average remaining term (in years)
0.70
24.
 
Income Taxes
At December
 
31, 2021,
 
a company,
 
which is
 
not part
 
of the
 
Australian tax
 
consolidated group,
 
had tax
 
losses
carried forward of $
5.9
 
million (tax effected) for which an equal valuation
 
allowance has been recognized.
The tax losses of $
27.0
 
million (tax effected) at December 31, 2021, carried forward at the Australian Operations
were fully utilized in 2022.
 
The U.S. House
 
of Representatives
 
approved a
 
$740 billion budget
 
reconciliation package
 
that includes
 
a new
minimum tax on certain large corporations, an excise tax on stock buybacks, a significant increase in funding for
the Internal Revenue Service, incentives to promote climate change mitigation and clean energy,
 
and provisions
to promote health
 
care affordability.
 
The Inflation Reduction
 
Act includes a
 
book-minimum tax
 
(AMT) similar
 
to
that originally proposed in the House-approved
 
Build Back Better legislation that would
 
impose a
15
% minimum
tax on “adjusted
 
financial statement income”
 
of applicable corporations over
 
the “corporate AMT
 
foreign tax credit
for the taxable
 
year.”
 
Under the bill,
 
an applicable corporation’s
 
minimum tax would
 
be equal to
 
the amount by
which
 
the
 
tentative
 
minimum
 
tax
 
exceeds
 
the
 
sum
 
of
 
the
 
corporation’s
 
regular
 
tax
 
for
 
the
 
year
 
and
 
the
corporation’s base
 
erosion and
 
anti-abuse tax
 
liability under
 
section 59A.
 
This provision
 
would be
 
effective
 
for
taxable years beginning after December 31, 2022 and
 
it is not expected to apply to the Company.
 
Income (loss) from
 
continuing operations before
 
income taxes for
 
the periods presented
 
below consisted of
 
the
following:
December 31,
(US$ thousands)
2022
2021
2020
U.S.
$
609,617
$
226,463
$
(116,354)
Non-U.S.
393,660
16,062
(170,199)
Total
$
1,003,277
$
242,525
$
(286,553)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
152
Total
income tax expense (benefit) for the periods presented
 
below consisted of the following:
December 31,
(US$ thousands)
2022
2021
2020
Current:
U.S. federal
$
90,933
$
30,075
$
(28,959)
Non-U.S.
75,270
(4,443)
(18,967)
State
25,347
3,480
(1,034)
Total
 
current
191,550
29,112
(48,960)
Deferred:
U.S. federal
406
13,486
18,353
Non-U.S.
35,425
6,658
(18,757)
State
4,193
3,846
(10,652)
Total
 
deferred
40,024
23,990
(11,056)
Total
 
income tax expense (benefit)
$
231,574
$
53,102
$
(60,016)
The following is a reconciliation of the expected statutory federal income tax expense (benefit) to the Company’s
income tax expense (benefit) for the periods presented
 
below:
December 31,
(US$ thousands)
2022
2021
2020
Current:
Expected income tax expense (benefit) at U.S. federal statutory
rate
$
210,690
$
50,931
$
(60,176)
Percentage depletion
(41,047)
—
—
Permanent differences
(2,262)
296
(3,144)
Prior period tax return adjustments and amendments
596
(4,259)
—
Foreign tax deductions method change and prior year
amendments
—
—
28,952
Australian branch impact on U.S. taxes
42,049
(1,699)
(21,398)
State income taxes, net of federal benefit
21,548
7,833
(4,250)
Total
 
income tax expense (benefit)
$
231,574
$
53,102
$
(60,016)
Effective tax rate
23.1%
21.9%
20.9%
Deferred income taxes
 
reflect the net
 
tax effects of
 
temporary differences between the
 
carrying amounts of
 
assets
and liabilities
 
for financial
 
reporting purposes
 
and the
 
amount used
 
for income
 
tax purposes
 
using the
 
enacted
tax rates and laws currently
 
in effect. Significant components
 
of the Company’s deferred
 
income tax assets and
liabilities as of December 31, 2022 and 2021 were as follows:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
153
December 31,
(US$ thousands)
2022
2021
Deferred income tax assets:
Accruals and provisions
$
36,409
$
29,091
Contract obligations
119,505
137,290
Asset retirement obligation
49,078
40,033
Goodwill
6,590
7,057
Tax
 
losses
6,886
35,078
U.S. asset on foreign deferred taxes
14,408
—
Other
31,747
22,676
Gross deferred income tax assets
264,623
271,225
Valuation allowance
(1)
(34,667)
(25,590)
Total
 
deferred income tax assets, net of valuation allowance
229,956
245,635
Deferred income tax liabilities:
Property, plant, equipment
 
and mine development, principally due to
differences in depreciation, depletion and asset
 
impairments
(300,968)
(272,219)
Warehouse stock
(13,980)
(14,903)
U.S. liability on foreign deferred taxes
—
(10,301)
Other
(10,679)
(9,246)
Total
 
deferred income tax liabilities
(325,627)
(306,669)
Net deferred income tax liability
$
(95,671)
$
(61,034)
(1)
 
As of December 31,
 
2022, the Company recorded
 
a valuation allowance against
 
a deferred tax asset
 
of an equal amount
 
which relates
predominantly to foreign tax credits, tax losses, land and
 
goodwill in Australia which is in the Other category in
 
the table. Due to the capital
character of these items and the
 
lack of expected capital gains,
 
the Australian group is not expected
 
to realize the benefit of this
 
deferred tax
asset.
Unrecognized Tax
 
Benefits
The
 
Company
 
provides
 
for
 
uncertain
 
tax
 
positions,
 
and
 
the
 
related
 
interest
 
and
 
penalties,
 
based
 
upon
management’s assessment of whether a tax benefit is
 
more likely than not to be sustained upon examination by
tax authorities.
 
To
 
the extent
 
that the
 
anticipated
 
tax outcome
 
of these
 
uncertain
 
tax positions
 
changes,
 
such
changes in estimate will impact the income tax
 
provision in the period in which such determination is made.
 
The
Company recognizes accrued interest and penalties related to uncertain tax
 
positions as a component of income
tax expense.
The Company
 
did not
 
identify any
 
new uncertain
 
tax positions
 
during the
 
year ended
 
December 31,
 
2021 and
2022, and as
 
a result the
 
Company does
no
t have any
 
recorded uncertain tax positions
 
as of December
 
31, 2022.
The Company
 
recorded
no
 
amounts related
 
to interest
 
and penalties
 
on uncertain
 
tax positions
 
for 2022, 2021
and 2020 and these years remain open to examination
 
by U.S. and Australian tax authorities.
25.
 
Fair Value Measurement
Fair Value of Financial Instruments
The fair
 
value of
 
a financial
 
instrument is
 
the amount
 
that will
 
be received
 
to sell
 
an asset
 
or paid
 
to transfer
 
a
liability in
 
an orderly transaction
 
between market participants
 
at the
 
measurement date. The
 
fair values
 
of financial
instruments involve uncertainty and cannot be determined with
 
precision.
The Company utilizes valuation
 
techniques that maximize
 
the use of observable inputs
 
and minimize the use of
unobservable
 
inputs
 
to
 
the
 
extent
 
possible.
 
The
 
Company
 
determines
 
fair
 
value
 
based
 
on
 
assumptions
 
that
market participants would
 
use in pricing
 
an asset or
 
liability in the
 
market. When considering
 
market participant
assumptions in fair
 
value measurements, the
 
following fair value
 
hierarchy distinguishes between observable
 
and
unobservable inputs, which are categorized in one of the
 
following levels:
Level
 
1
 
Inputs:
 
Unadjusted
 
quoted
 
prices
 
in
 
active
 
markets
 
for
 
identical
 
assets
 
or
 
liabilities
 
accessible
 
to
 
the
reporting entity at the measurement date.
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
154
Level 2 Inputs: Other than
 
quoted prices that are observable
 
for the asset or
 
liability, either
 
directly or indirectly,
for substantially the full term of the asset or liability.
Level
 
3
 
Inputs:
 
Unobservable
 
inputs
 
for
 
the
 
asset
 
or
 
liability
 
used
 
to
 
measure
 
fair
 
value
 
to
 
the
 
extent
 
that
observable inputs
 
are not
 
available, thereby
 
allowing for
 
situations in
 
which there
 
is little, if
 
any,
 
market activity
for the asset or liability at measurement date.
Financial Instruments Measured on a Recurring Basis
As of December
 
31, 2022
 
and 2021,
 
there were
no
 
financial instruments
 
required to
 
be measured
 
at fair
 
value
on a recurring basis.
 
Other Financial Instruments
The following methods and assumptions are used to estimate the
 
fair value of other financial instruments as of
December 31, 2022 and 2021:
•
 
Cash and
 
restricted cash, accounts
 
receivable, accounts payable,
 
accrued expenses, lease
 
liabilities and
other
 
current
 
financial
 
liabilities:
 
The
 
carrying
 
amounts
 
reported
 
in
 
the
 
Consolidated
 
Balance
 
Sheets
approximate fair value due to the short maturity of these
 
instruments.
•
 
Restricted deposits,
 
lease liabilities,
 
interest bearing
 
liabilities and
 
other financial
 
liabilities: The
 
fair values
approximate the carrying amounts
 
reported in the Consolidated Balance Sheets.
•
 
Interest bearing liabilities: The
 
Company’s outstanding interest-bearing liabilities are carried at
 
amortized
cost.
 
As
 
of
 
December
 
31,
 
2022,
 
there
 
were
no
 
borrowings
 
outstanding
 
under
 
the
 
ABL
 
Facility.
 
The
estimated fair value
 
of the Notes
 
as of December
 
31, 2022 is
 
approximately $
249.7
 
million based upon
quoted market prices in a market that is not considered active
 
(Level 2).
Other than
 
the estimated
 
fair values
 
of the
 
Greenbrier
 
mining asset
 
held for
 
sale
 
described
 
in Note
 
4 “Assets
Held for Sale” and Note 5 “Impairment of Assets”, which are level
 
3 fair value measurements, there are no other
fair value
 
measurements of
 
assets and
 
liabilities that
 
are measured
 
at fair
 
value on
 
a nonrecurring
 
basis as
 
of
December 31, 2022 and 2021.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
155
26.
 
Accumulated Other Comprehensive Losses
The Company’s Accumulated
 
Other Comprehensive Losses
 
consists of foreign currency
 
translation adjustment
from subsidiaries not using the U.S. dollar as their functional currency.
Net
 
gain
(loss)
(US$ thousands)
Foreign
currency
translation
adjustments
Cash flow
fuel hedges
Total
Balance at December 31, 2020
$
(26,777)
$
(2,029)
$
(28,806)
Net current-period other comprehensive income (loss):
Gain in other comprehensive income before reclassifications
 
6,991
9,922
16,913
Loss on long-term intra-entity foreign currency transactions
(24,442)
—
(24,442)
Gain reclassified from accumulated other comprehensive
 
loss
—
(7,023)
(7,023)
Tax
 
effects
—
(870)
(870)
Total
 
net current-period other comprehensive income (loss)
(17,451)
2,029
(15,422)
Balance at December 31, 2021
(44,228)
—
(44,228)
Net current-period other comprehensive income (loss):
Loss in other comprehensive income
(19,610)
—
(19,610)
Loss on long-term intra-entity foreign currency transactions
(27,585)
—
(27,585)
Total
 
net current-period other comprehensive losses
(47,195)
—
(47,195)
Balance at December 31, 2022
$
(91,423)
$
—
$
(91,423)
27.
 
Commitments
(a)
 
Mineral Leases
The
 
Company
 
leases
 
mineral
 
interests
 
and
 
surface
 
rights
 
from
 
land
 
owners
 
under
 
various
 
terms
 
and
 
royalty
rates. The future minimum royalties under these leases
 
are as follows:
(US$ thousands)
Amount
Year ending
 
December 31,
2023
$
5,493
2024
5,365
2025
5,258
2026
5,127
2027
5,101
Thereafter
26,398
Total
$
52,742
Mineral leases are not in scope of ASC 842 and continue to
 
be accounted for under the guidance in ASC 932,
Extractive Activities – Mining.
(b)
Other commitments
As
 
of
 
December
 
31,
 
2022,
 
purchase
 
commitments
 
for
 
capital
 
expenditures
 
were
 
$
28.6
 
million,
 
all
 
of
 
which
 
is
obligated within the next 12 months.
In Australia, the
 
Company has generally
 
secured the ability
 
to transport coal
 
through rail contracts
 
and coal export
terminal contracts that are primarily funded
 
through take-or-pay arrangements with terms ranging up to
13 years
.
 
In the U.S., the Company typically
 
negotiates its rail and coal terminal
 
on an annual basis.
 
As of December 31,
2022,
 
these
 
Australian
 
and
 
U.S.
 
commitments
 
under
 
take-or-pay
 
arrangements
 
totaled
 
$
0.93
 
billion,
 
of
 
which
approximately $
96.7
 
million is obligated
 
within the next
 
year,
 
$
203.1
 
million within
 
1-3 years, $
206.6
 
million 3-5
years and $
426.3
 
million thereafter.
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
156
28.
 
Contingencies
In the
 
normal course
 
of business,
 
the Company
 
is a
 
party to
 
certain guarantees
 
and financial
 
instruments with
off-balance sheet risk, such as bank
 
guarantees, letters of credit and performance
 
or surety bonds. No liabilities
related to these arrangements are reflected in the Company’s Consolidated Balance Sheets.
 
Management does
not expect any material losses to result from these guarantees
 
or off-balance sheet financial instruments.
As required
 
by certain
 
agreements,
 
the Company
 
had cash
 
collateral
 
in the
 
form of
 
deposits in
 
the amount
 
of
$
89.1
 
million and $
81.0
 
million as of December 31,
 
2022 and 2021, respectively, to provide back-to-back support
for bank guarantees, financial
 
payments, other performance obligations, various
 
other operating agreements and
contractual obligations
 
under workers
 
compensation insurance.
 
These deposits
 
are restricted
 
and classified
 
as
long-term assets in the Consolidated Balance Sheets.
In accordance
 
with the
 
terms of
 
the ABL
 
Facility,
 
the Company
 
may be
 
required
 
to cash
 
collateralize
 
the ABL
Facility to the extent of outstanding letters of credit after the expiration or termination date of such letter of credit.
As of December 31, 2022,
no
 
such letter of credit was outstanding and as such
no
 
cash collateral was required.
For the U.S. Operations in order to provide the required financial assurance, the Company generally uses surety
bonds for post-mining reclamation. The Company can also use bank letters of credit to collateralize certain other
obligations. As of December 31, 2022, the Company had outstanding surety bonds of $
34.9
 
million and letters of
credit of $
16.8
 
million issued from our available bank guarantees,
 
to meet contractual obligations under workers
compensation insurance and to secure various
 
obligations and commitments. Future regulatory changes relating
to these obligations could result in increased obligations,
 
additional costs or additional collateral requirements.
For the Australian Operations, the Company had bank guarantees outstanding
 
of $
27.4
million at December 31,
2022, primarily in respect of certain rail and port arrangements
 
of the Company.
 
At December 31, 2022, the Company had total outstanding
 
bank guarantees provided of $
44.2
 
million to secure
obligations and commitments.
Stamp duty on Curragh acquisition
On September 27, 2022, the Company received from
 
the Queensland Revenue Office, or QRO,
 
an assessment
of the stamp duty
 
payable on its
 
acquisition of the Curragh
 
mine in March
 
2018. The QRO assessed
 
the stamp
duty
 
on
 
this
 
acquisition
 
at
 
an
 
amount
 
of
 
$
55.4
 
million
 
(A$
82.2
 
million)
 
plus
 
unpaid
 
tax
 
interest
 
of
 
$
8.2
 
million
(A$
12.1
 
million).
 
On
 
November
 
23,
 
2022,
 
the
 
Company
 
filed
 
an
 
objection
 
to
 
the
 
assessment
 
and
 
is
 
currently
awaiting the outcome of this objection. The outcome of
 
this objection is uncertain.
 
The Company
 
has reviewed
 
the assessment
 
received and
 
based on
 
legal and
 
valuation advice
 
it has
 
sought,
continues to maintain its position and the estimated accrual of $
29.0
 
million (A$
43.0
 
million) stamp duty payable
on the Curragh acquisition. During
 
the period the Company made a partial
 
payment of stamp duty,
 
reducing the
remaining estimated accrual
 
for stamp duty
 
to $
11.7
 
million (A$
17.3
 
million) as at December
 
31, 2022, which
 
is
included within “Accrued Expenses and Other Current Liabilities”
 
in its Consolidated Balance sheet.
 
From time to time, the
 
Company becomes a
 
party to other legal
 
proceedings in the
 
ordinary course of business
in Australia, the U.S. and other countries where the Company does business.
 
Based on current information, the
Company believes that such other pending
 
or threatened proceedings are likely to
 
be resolved without a material
adverse
 
effect
 
on
 
its
 
financial
 
condition,
 
results
 
of
 
operations
 
or
 
cash
 
flows.
 
In
 
management’s
 
opinion,
 
the
Company is not currently
 
involved in any legal
 
proceedings, which individually
 
or in the aggregate
 
could have a
material effect on the financial condition, results of
 
operations and/or liquidity of the Company.
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
157
29. Related
‑
Party Transactions
Xcoal
On
 
May
 
27,
 
2021,
 
Xcoal
 
ceased
 
to
 
be
 
a
 
related
 
party
 
after
 
Xcoal’s
 
founder,
 
chief
 
executive
 
officer
 
and
 
chief
marketing officer,
 
Mr. Ernie Thrasher,
 
retired as a non-executive director of the Company.
 
“Coal
 
revenues
 
from
 
related
 
parties”
 
of
 
$
97.3
 
million
 
in
 
the
 
Consolidated
 
Statement
 
of
 
Operations
 
and
Comprehensive Income for the period up to May 27, 2021, represent
 
revenues from Xcoal while it was a related
party.
 
Revenues
 
from
 
coal
 
sales
 
to
 
Xcoal
 
after
 
May
 
27,
 
2021
 
are
 
included
 
within
 
“Coal
 
revenues”
 
in
 
the
Consolidated Statement of Operations and Comprehensive Income.
 
Revenues from Xcoal of $
134.6
 
million for the year ended December
 
31, 2020, are recorded as “Coal
 
revenues
from related parities” in the Consolidated Statement of Operations
 
and Comprehensive Income.
 
The Energy & Mineral Group
On
 
May
 
12,
 
2021,
 
affiliates
 
of
 
The
 
Energy
 
&
 
Minerals
 
Group,
 
or
 
EMG,
 
which
 
is
 
the
 
Company’s
 
controlling
stockholder
 
through
 
its
 
ownership
 
of
 
Coronado
 
Group
 
LLC,
 
participated
 
in
 
the
 
Notes Offering
 
and
 
purchased
$
65.0
 
million aggregate principal amount of Notes at the closing of the Notes Offering. Following
 
the redemption
of
 
Notes
 
in
 
November
 
2021
 
and
 
November
 
2022,
 
as
 
described
 
in
 
Note
 
17
 
“Interest
 
Bearing
 
Liabilities”,
 
the
principal amount of Notes
 
held by EMG reduced
 
to $
52.0
 
million and remained
 
unchanged as at December
 
31,
2022.
 
At
 
December
 
31,
 
2022,
 
interest
 
payable
 
to
 
affiliates
 
of
 
EMG
 
on
 
the
 
Notes
 
was
 
$
0.7
 
million
 
and
 
was
recorded
 
within
 
“Accrued
 
expenses
 
and
 
other
 
current
 
liabilities”
 
in
 
the
 
Consolidated
 
Balance
 
Sheet.
 
Interest
expense to affiliates
 
of EMG was
 
$
7.1
 
million for the
 
year ended December
 
31, 2022, and recorded
 
in “Interest
expense, net” in the Consolidated Statement of Operations
 
and Comprehensive Income.
Coronado Group LLC
Under
 
the
 
Coronado
 
Group LLC
 
agreement
 
(as
 
amended,
 
effective
 
October 23,
 
2018),
2,900
 
management
incentive units were designated and authorized for issuance
 
to certain members of management to motivate and
retain senior management.
 
The plan is designated
 
to allow key members
 
of management to share
 
in the profits
of the Company
 
after certain
 
returns are
 
achieved by
 
the equity
 
investors. The
 
incentive units
 
constitute “profit
interests” for the benefit of senior management in consideration
 
of services rendered and to be rendered.
 
Coronado Coal LLC and Coronado II
 
LLC merged to form Coronado Group
 
LLC in July 2015. Coronado IV
 
LLC
was
 
merged
 
into
 
Coronado
 
Group LLC,
 
the
 
Company’s
 
controlling
 
stockholder,
 
on
 
June 30,
 
2016.
 
Under
 
the
updated formation
 
agreement dated
 
June 30, 2016,
 
the
2,500
 
designated and authorized
 
units under the
 
initial
formation of
 
Coronado Group LLC
 
were replaced
 
by these
 
new units.
 
At December
 
31, 2022
 
and 2021,
2,900
management incentive units were outstanding.
The incentive units are comprised of three
 
tiers, which entitle the holders to receive
 
distributions from Coronado
Group LLC subordinate
 
to the
 
distributions to
 
be received
 
by Members.
 
As of
 
December 31, 2022
 
and 2021,
 
a
portion of the authorized
 
units have been allocated
 
to various members of the
 
Company’s management including
Mr. Garold Spindler,
 
CEO, who is also member of Coronado Group LLC.
Stockholder’s Agreement and Registration Rights
 
and Sell-Down Agreement
As
 
of
 
December
 
31,
 
2022,
 
Coronado
 
Group LLC
 
has
 
beneficial
 
ownership
 
in
 
the
 
aggregate
 
of
50.4
%
 
of
 
the
Company’s
 
Shares.
 
On
 
September 24,
 
2018,
 
Coronado
 
Group LLC
 
and
 
the
 
Company
 
entered
 
into
 
a
Stockholder’s Agreement
 
and a
 
Registration Rights
 
and Sell-Down
 
Agreement
 
which governs
 
the relationship
between Coronado
 
Group LLC
 
and the
 
Company
 
while the
 
EMG Group
 
beneficially
 
owns in
 
the aggregate
 
at
least
50
%
 
of
 
our
 
outstanding
 
shares
 
of
 
common
 
stock
 
(including
 
shares
 
of
 
common
 
stock
 
underlying
 
CDIs),
including certain governance matters relating to the Company. Under this Agreement, Coronado Group LLC has
the ability to
 
require the Company
 
to register its
 
shares under the
 
U.S. Securities Exchange
 
Act of 1934
 
and to
provide assistance to Coronado Group LLC in selling
 
some or all of its shares (including in the form of CDIs).
The Stockholder’s Agreement provides for the following:
•
 
Consent rights: Coronado
 
Group LLC (or its
 
successors or permitted
 
assigns) will have
 
certain consent
rights, whereby pre-agreed actions
 
require approval by Coronado
 
Group LLC prior to these
 
actions being
undertaken;
NOTES TO CONSOLIDATED
 
FINANCIAL STATEMENTS
 
(Continued)
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
158
•
 
Provision
 
of
 
information
 
to
 
Coronado
 
Group LLC:
 
There
 
will
 
be
 
ongoing
 
information
 
sharing
arrangements
 
relating
 
to
 
the
 
provision
 
of
 
financial
 
and
 
other
 
information
 
by
 
the
 
Company
 
and
 
its
subsidiaries to Coronado Group LLC group entities and cooperation and assistance between the parties
in connection with any financing (or refinancing) undertaken
 
by the Company;
•
 
Pro rata issuances: While Coronado Group LLC Group entities beneficially own in the
 
aggregate at least
10
% of
 
the outstanding
 
Shares, unless
 
Coronado
 
Group LLC
 
(or
 
its successors
 
or permitted
 
assigns)
agrees
 
otherwise,
 
issuances
 
of
 
equity
 
securities
 
must
 
have
 
been
 
offered
 
to
 
Coronado
 
Group LLC
 
in
respect of
 
its pro
 
rata shares
 
and any
 
equity securities
 
to be
 
allocated by
 
the Company
 
under a
 
share
incentive plan will be sourced by purchasing them in the market
 
rather than by issuing them; and
•
 
Board rights:
 
Certain rights
 
regarding the
 
board including
 
the right,
 
but not
 
the obligation,
 
to designate
the Directors
 
to be
 
included in the
 
membership of
 
any board committee,
 
except to the
 
extent that
 
such
membership would violate applicable securities laws or
 
stock exchange or stock market rules.
Relationship Deed
On September 24, 2018, the Company and Coronado Group LLC entered into a Relationship Deed under which
the Company provides
 
a number of indemnities
 
in favor of Coronado
 
Group LLC, including in
 
relation to certain
ASX initial public
 
offering, or
 
Australian IPO, -related
 
matters and also
 
certain guarantees
 
that have in
 
the past
been provided or
 
arranged by Coronado
 
Group LLC and
 
its affiliates
 
in support of
 
Company obligations.
 
Under
the
 
Relationship
 
Deed,
 
Coronado
 
Group LLC
 
also
 
agrees
 
to
 
indemnify
 
the
 
Company
 
in
 
relation
 
to
 
certain
Australian IPO-related matters and reimburse certain costs.
30.
 
Subsequent Events
Ordinary dividends
On
 
February
 
21,
 
2023,
 
the
 
Company’s
 
Board
 
of
 
Directors
 
declared
 
a
 
bi-annual
 
fully
 
franked
 
fixed
 
ordinary
dividend of $
8.4
 
million, or
0.5
 
cents per CDI. The
 
Company is not required
 
to make an offer
 
to purchase Notes
in
 
relation
 
to
 
this
 
dividend
 
due
 
to
 
the
 
available
 
unaccepted
 
portion
 
of
 
the
 
offer
 
to
 
purchase
 
Notes
 
made
 
in
connection with special dividends declared on October 30,
 
2022.
 
The dividend will
 
have a record
 
date of
 
March 15, 2023
, Australia time,
 
and be payable
 
on
April 5, 2023
, Australia
time.
 
CDIs will
 
be quoted
 
“ex” dividend
 
on March
 
14, 2023,
 
Australia time.
 
The total
 
ordinary dividend
 
will be
funded from available cash.
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
159
REPORT OF INDEPENDENT REGISTERED PUBLIC
 
ACCOUNTING FIRM
To
 
the Shareholders and the Board of Directors of Coronado
 
Global Resources Inc.
Opinion on the Financial Statements
We
 
have
 
audited
 
the
 
accompanying
 
consolidated
 
balance
 
sheets
 
of
 
Coronado
 
Global
 
Resources
 
Inc.
 
(the
Company)
 
as
 
of
 
December
 
31,
 
2022
 
and
 
2021,
 
the
 
related
 
consolidated
 
statements
 
of
 
operations
 
and
comprehensive
 
income,
 
stockholders’
 
equity
 
and
 
cash
 
flows
 
for
 
each
 
of
 
the
 
three
 
years
 
in
 
the
 
period
 
ended
December 31, 2022, and the related notes (collectively referred to as the “consolidated financial statements”). In
our opinion, the consolidated financial
 
statements present fairly,
 
in all material respects, the
 
financial position of
the Company at December 31, 2022 and
 
2021, and the results of its
 
operations and its cash flows for
 
each of the
three
 
years
 
in
 
the
 
period
 
ended
 
December
 
31,
 
2022,
 
in
 
conformity
 
with
 
U.S.
 
generally
 
accepted
 
accounting
principles.
We
 
also
 
have
 
audited,
 
in
 
accordance
 
with
 
the
 
standards
 
of the
 
Public
 
Company
 
Accounting
 
Oversight
 
Board
(United States)
 
(PCAOB), the
 
Company's internal control
 
over financial
 
reporting as
 
of December
 
31, 2022,
 
based
on
 
criteria
 
established
 
in
 
Internal
 
Control-Integrated
 
Framework
 
issued
 
by
 
the
 
Committee
 
of
 
Sponsoring
Organizations of
 
the Treadway Commission (2013
 
framework) and our
 
report dated
 
February 21,
 
2023 expressed
an unqualified opinion thereon.
Basis for Opinion
These financial statements are the responsibility of the
 
Company's management. Our responsibility is to express
an opinion
 
on the
 
Company’s financial statements
 
based on
 
our audits.
 
We are a
 
public accounting
 
firm registered
with the PCAOB
 
and are
 
required to
 
be independent
 
with respect to
 
the Company
 
in accordance with
 
the U.S.
federal securities laws and the applicable rules and regulations of the
 
Securities and Exchange Commission and
the PCAOB.
We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan
and perform the audit to
 
obtain reasonable assurance about whether the
 
financial statements are free of
 
material
misstatement, whether
 
due to
 
error or
 
fraud. Our
 
audits included
 
performing procedures
 
to assess
 
the risks
 
of
material misstatement of the financial statements, whether due to error or fraud, and performing procedures that
respond to
 
those risks.
 
Such procedures
 
included examining,
 
on a
 
test basis,
 
evidence regarding
 
the amounts
and disclosures
 
in the
 
financial statements.
 
Our audits
 
also included
 
evaluating the
 
accounting principles
 
used
and significant
 
estimates made
 
by management,
 
as well
 
as evaluating
 
the overall
 
presentation of
 
the financial
statements. We believe that our audits provide a reasonable
 
basis for our opinion.
Critical Audit Matter
The critical
 
audit
 
matter communicated
 
below is
 
a matter
 
arising
 
from
 
the current
 
period audit
 
of the
 
financial
statements that was communicated
 
or required to be communicated
 
to the audit committee and that:
 
(1) relates
to accounts
 
or disclosures that
 
are material
 
to the
 
financial statements and
 
(2) involved our
 
especially challenging,
subjective, or
 
complex judgments.
 
The communication
 
of the critical
 
audit matter
 
does not alter
 
in any way
 
our
opinion on the consolidated financial
 
statements, taken as a whole,
 
and we are not, by
 
communicating the critical
audit matter below,
 
providing a separate opinion on
 
the critical audit matter or
 
on the accounts or disclosures
 
to
which it relates.
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
160
Stamp Duty assessment on the acquisition of the
 
Curragh mine
Description of the
matter
As described in Note 28 to the consolidated financial statements, the Company received an
assessment from
 
the Queensland
 
Revenue Office
 
(“QRO”) for
 
the stamp
 
duty payable
 
on
the Company’s
 
2018 acquisition
 
of the
 
Curragh mine.
 
The QRO
 
assessed the
 
stamp duty
on this acquisition at an amount
 
of $55.4 million plus unpaid tax interest
 
of $8.2 million.
 
The
Company disputes the QRO’s calculation
 
of the liability, which the Company estimates to
 
be
$29.0 million
 
including unpaid
 
tax interest.
 
On November
 
23, 2022,
 
the Company
 
filed an
objection to the assessment and is currently awaiting its
 
outcome.
 
Auditing the accrual for the stamp duty obligation involved complex auditor judgment,
 
given
the
 
materiality
 
of
 
the
 
assessment
 
made
 
by
 
the
 
QRO,
 
the
 
unique
 
nature
 
of
 
the
 
property
acquired
 
and
 
the
 
resulting
 
difficulty
 
in
 
assessing
 
the
 
Company’s
 
judgments
 
around
 
the
interpretation and application of the law to this matter.
How we
addressed the
matter in our
audit
We
 
obtained
 
an
 
understanding,
 
evaluated
 
the
 
design
 
and
 
tested
 
the
 
operation
 
of
management’s controls related to the Company’s process for the recognition, measurement
and
 
disclosure
 
of
 
the
 
stamp
 
duty
 
contingency,
 
as
 
a
 
non-routine
 
judgmental
 
accounting
matter including the Company’s interpretation of tax
 
law.
 
Our
 
audit
 
procedures
 
included,
 
among
 
others,
 
understanding
 
external
 
legal
 
counsel
opinions obtained by
 
management to support
 
their interpretation and
 
application of the
 
law
in this matter. We also
 
discussed external legal counsel’s
 
opinion with external
 
legal counsel
directly.
We
 
involved
 
our
 
indirect
 
tax
 
professionals
 
to
 
help
 
us
 
evaluate
 
the
 
Company’s
 
judgments
around the interpretation and application
 
of the law to this matter and
 
the relative likelihood
of the multiple alternative potential outcomes. These potential outcomes included the risk of
litigation and estimations of interest and penalties payable.
We also evaluated the disclosures made in the
 
consolidated financial statements.
 
/s/
Ernst & Young
We have served as the Company’s auditor
 
since 2020.
Brisbane, Australia
 
February 21, 2023
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
161
ITEM 9.
 
CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS
 
ON ACCOUNTING AND
FINANCIAL DISCLOSURE.
None.
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
162
ITEM 9A.
 
CONTROLS AND PROCEDURES
Disclosure Controls and Procedures
We are
 
subject to
 
the periodic
 
reporting requirements
 
of the
 
Exchange Act.
 
We have
 
designed our
 
disclosure
controls and procedures
 
to provide reasonable
 
assurance that information we
 
disclose in reports
 
we file or
 
submit
under the Exchange
 
Act is recorded,
 
processed, summarized,
 
and reported within
 
the time periods
 
specified in
the
 
rules
 
and
 
forms
 
of
 
the
 
SEC.
 
Disclosure
 
controls
 
and
 
procedures
 
are
 
controls
 
and
 
procedures
 
that
 
are
designed
 
to
 
ensure
 
that
 
information
 
required
 
to
 
be
 
disclosed
 
in
 
our
 
reports
 
filed
 
under
 
the
 
Exchange
 
Act
 
is
recorded, processed, summarized
 
and reported, within the
 
time periods specified
 
in the SEC’s rules
 
and forms.
Disclosure controls and procedures
 
include, without limitation,
 
controls and procedures
 
designed to ensure that
information required
 
to be
 
disclosed by
 
our company
 
in the
 
reports that
 
it files
 
or submits
 
under the
 
Exchange
Act is
 
accumulated and communicated
 
to our
 
management, including its
 
principal executive and
 
principal financial
officers,
 
or
 
persons
 
performing
 
similar
 
functions,
 
as
 
appropriate
 
to
 
allow
 
timely
 
decisions
 
regarding
 
required
disclosure.
 
The Company, under the supervision and with the participation of its management, including the Chief Executive
Officer
 
and
 
the
 
Group
 
Chief
 
Financial
 
Officer,
 
evaluated
 
the
 
effectiveness
 
of
 
the
 
design
 
and
 
operation
 
of
 
the
Company’s disclosure
 
controls and
 
procedures (as
 
defined in
 
Rules 13a-15(e)
 
under the
 
Exchange Act)
 
as of
the end of
 
the period covered
 
by this report,
 
and concluded
 
that such disclosure
 
controls and
 
procedures were
effective to provide reasonable assurance that the
 
desired control objectives were achieved.
 
Changes to Internal Control over Financial Reporting
There have been
 
no changes in
 
our internal control
 
over financial reporting
 
or in
 
other factors that
 
occurred during
our
 
last
 
fiscal
 
quarter
 
that
 
have
 
materially
 
affected,
 
or
 
are
 
reasonably
 
likely
 
to
 
materially
 
affect,
 
our
 
internal
controls over financial reporting.
 
Management’s Report on Internal Control
 
Over Financial Reporting
Our management
 
is responsible
 
for establishing and
 
maintaining adequate internal
 
control over
 
financial reporting
as
 
defined
 
in
 
Rules
 
13a-15(f)
 
under
 
the
 
Exchange
 
Act.
 
Internal
 
control
 
over
 
financial
 
reporting
 
is
 
a
 
process
designed to
 
provide reasonable
 
assurance regarding
 
the reliability
 
of financial
 
reporting and
 
the preparation
 
of
the Company’s
 
consolidated financial
 
statements for
 
external purposes
 
in accordance
 
with generally
 
accepted
accounting principles.
 
Internal control over financial reporting includes
 
those policies and procedures that (i) pertain
 
to the maintenance
of records that,
 
in reasonable detail,
 
accurately and fairly
 
reflect the transactions
 
and dispositions of
 
the assets
of the
 
Company;
 
(ii) provide
 
reasonable assurance
 
that
 
transactions
 
are recorded
 
as necessary
 
to permit
 
the
preparation of the
 
consolidated financial statements in
 
accordance with generally
 
accepted accounting principles,
and
 
that
 
receipts
 
and
 
expenditures
 
of
 
the
 
Company
 
are
 
being
 
made
 
only
 
in
 
accordance
 
with
 
appropriate
authorizations of management
 
and directors of
 
the Company; and
 
(iii) provide reasonable
 
assurance regarding
prevention or timely detection of unauthorized acquisition, use or disposition of the Company’s
 
assets that could
have a material effect on the consolidated financial
 
statements.
 
Because
 
of
 
its
 
inherent
 
limitations,
 
internal
 
control
 
over
 
financial
 
reporting
 
may
 
not
 
prevent
 
or
 
detect
misstatements. Also,
 
projections of
 
any evaluation
 
of effectiveness
 
to future
 
periods are
 
subject to
 
the risk
 
that
controls may
 
become inadequate
 
because of
 
changes in
 
conditions, or
 
that the
 
degree of
 
compliance with
 
the
policies or procedures may deteriorate.
 
Management
 
conducted
 
an
 
assessment
 
of
 
the
 
Company’s
 
internal
 
control
 
over
 
financial
 
reporting
 
as
 
of
December 31, 2022, using the framework specified in
Internal Control – Integrated Framework (2013)
, published
by
 
the
 
Committee
 
of
 
Sponsoring
 
Organizations
 
of
 
the
 
Treadway
 
Commission
 
(COSO).
 
Based
 
on
 
this
assessment, management
 
concluded that
 
the Company’s
 
internal control
 
over financial
 
reporting was
 
effective
as of December 31, 2022.
 
Our
 
Independent
 
Registered
 
Public
 
Accounting
 
Firm,
 
Ernst
 
&
 
Young,
 
has
 
audited
 
our
 
internal
 
control
 
over
financial reporting, as stated in their unqualified opinion
 
report included herein.
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
163
REPORT OF INDEPENDENT REGISTERED PUBLIC
 
ACCOUNTING FIRM
To
 
the Shareholders and the Board of Directors of Coronado
 
Global Resources Inc.
 
Opinion on Internal Control Over Financial Reporting
We have audited Coronado Global Resources
 
Inc.’s internal control over financial
 
reporting as of December 31,
2022,
 
based
 
on
 
criteria
 
established
 
in
 
Internal
 
Control—Integrated
 
Framework
 
issued
 
by
 
the
 
Committee
 
of
Sponsoring Organizations
 
of the
 
Treadway
 
Commission (2013
 
framework) (the
 
COSO criteria).
 
In our
 
opinion,
Coronado Global
 
Resources
 
Inc. (the
 
Company)
 
maintained,
 
in
 
all material
 
respects,
 
effective
 
internal control
over financial reporting as of December 31, 2022, based on the
 
COSO criteria.
We
 
also
 
have
 
audited,
 
in
 
accordance
 
with
 
the
 
standards
 
of the
 
Public
 
Company
 
Accounting
 
Oversight
 
Board
(United States) (PCAOB), the consolidated balance sheets of the Company as of December 31, 2022 and 2021,
the
 
related
 
consolidated
 
statements
 
of
 
operations
 
and
 
comprehensive
 
income,
 
stockholders’
 
equity
 
and
 
cash
flows for each
 
of the three
 
years in the
 
period ended
 
December 31, 2022,
 
and the related
 
notes and our
 
report
dated February 21, 2023 expressed an unqualified opinion
 
thereon.
Basis for Opinion
The Company’s management is responsible for maintaining effective internal control over financial reporting and
for its assessment
 
of the effectiveness
 
of internal control
 
over financial reporting
 
included in the
 
accompanying
Management’s Report
 
on Internal
 
Control Over
 
Financial Reporting.
 
Our responsibility
 
is to express
 
an opinion
on the
 
Company’s internal
 
control over
 
financial reporting
 
based on
 
our audit.
 
We are
 
a public
 
accounting firm
registered with the PCAOB and are required to be independent with respect
 
to the Company in accordance with
the
 
U.S.
 
federal
 
securities
 
laws
 
and
 
the
 
applicable
 
rules
 
and
 
regulations
 
of
 
the
 
Securities
 
and
 
Exchange
Commission and the PCAOB.
We conducted our audit
 
in accordance with the standards
 
of the PCAOB. Those standards
 
require that we plan
and
 
perform
 
the
 
audit
 
to
 
obtain
 
reasonable
 
assurance
 
about
 
whether
 
effective
 
internal
 
control
 
over
 
financial
reporting was maintained in all material respects.
Our audit included obtaining an understanding
 
of internal control over financial reporting,
 
assessing the risk that
a
 
material
 
weakness
 
exists,
 
testing
 
and
 
evaluating
 
the
 
design
 
and
 
operating
 
effectiveness
 
of
 
internal
 
control
based
 
on
 
the
 
assessed
 
risk,
 
and
 
performing
 
such
 
other
 
procedures
 
as
 
we
 
considered
 
necessary
 
in
 
the
circumstances. We believe that our audit provides a reasonable
 
basis for our opinion.
Definition and Limitations of Internal Control Over
 
Financial Reporting
A
 
company’s
 
internal
 
control
 
over
 
financial
 
reporting
 
is
 
a
 
process
 
designed
 
to
 
provide
 
reasonable
 
assurance
regarding the reliability of financial reporting
 
and the preparation of financial statements
 
for external purposes in
accordance with generally
 
accepted accounting principles.
 
A company’s internal
 
control over financial
 
reporting
includes those policies
 
and procedures that (1)
 
pertain to the maintenance
 
of records that, in
 
reasonable detail,
accurately and
 
fairly reflect
 
the transactions and
 
dispositions of the
 
assets of
 
the company;
 
(2) provide reasonable
assurance
 
that
 
transactions
 
are
 
recorded
 
as
 
necessary
 
to
 
permit
 
preparation
 
of
 
financial
 
statements
 
in
accordance with
 
generally accepted
 
accounting principles,
 
and that
 
receipts and
 
expenditures of
 
the company
are being
 
made only
 
in accordance
 
with authorizations
 
of management
 
and directors
 
of the
 
company; and
 
(3)
provide
 
reasonable
 
assurance
 
regarding
 
prevention
 
or
 
timely
 
detection
 
of
 
unauthorized
 
acquisition,
 
use,
 
or
disposition of the company’s assets that could have
 
a material effect on the financial statements.
Because
 
of
 
its
 
inherent
 
limitations,
 
internal
 
control
 
over
 
financial
 
reporting
 
may
 
not
 
prevent
 
or
 
detect
misstatements. Also,
 
projections of
 
any evaluation
 
of effectiveness
 
to future
 
periods are
 
subject to
 
the risk
 
that
controls may
 
become inadequate
 
because of
 
changes in
 
conditions, or
 
that the
 
degree of
 
compliance with
 
the
policies or procedures may deteriorate.
/s/ Ernst & Young
Brisbane, Australia
February 21, 2023
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
164
ITEM 9B.
 
OTHER INFORMATION
None.
ITEM 9C.
 
DISCLOSURE REGARDING FOREIGN JURISDICTIONS
 
THAT PREVENT
 
INSPECTIONS
None.
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
165
PART III
ITEM 10.
 
DIRECTORS, EXECUTIVE OFFICERS AND
 
CORPORATE GOVERNANCE.
The information required to
 
be furnished by
 
this Item will be
 
set forth in
 
our definitive proxy statement
 
for the 2023
Annual Meeting of
 
Stockholders, or the
 
Proxy Statement,
 
under the heading
 
“Executive Officers
 
and Corporate
Governance”, and is incorporated herein by reference
 
and made a part hereof from the Proxy Statement.
 
ITEM 11.
 
EXECUTIVE COMPENSATION.
The information required
 
to be furnished
 
by this Item
 
will be set forth
 
in the Proxy Statement
 
under the heading
“Executive
 
Compensation”
 
and
 
is
 
incorporated
 
herein
 
by
 
reference
 
and
 
made
 
a
 
part
 
hereof
 
from
 
the
 
Proxy
Statement.
 
ITEM 12.
 
SECURITY OWNERSHIP OF CERTAIN
 
BENEFICIAL OWNERS AND MANAGEMENT AND
RELATED STOCKHOLDER
 
MATTERS.
The
 
information
 
required
 
to
 
be
 
furnished
 
by
 
this
 
Item
 
will
 
be
 
set
 
forth
 
in
 
the
 
Proxy
 
Statement
 
under
 
the
heading “Security Ownership
 
of Certain Beneficial
 
Owners and Management
 
and Related Stockholder
 
Matters”
and is incorporated herein by reference and made a part
 
hereof from the Proxy Statement.
 
ITEM 13.
 
CERTAIN RELATIONSHIPS AND RELATED
 
TRANSACTIONS, AND DIRECTOR INDEPENDENCE.
The information required
 
to be furnished
 
by this Item
 
will be set forth
 
in the Proxy Statement
 
under the heading
“Certain Relationships and
 
Related Transactions” and is
 
incorporated herein by
 
reference and made
 
a part
 
hereof
from the Proxy Statement.
 
ITEM 14. PRINCIPAL
 
ACCOUNTING FEES AND SERVICES.
The information required
 
to be furnished
 
by this Item
 
will be set forth
 
in the Proxy Statement
 
under the heading
“Ratification of
 
Appointment of
 
Independent
 
Registered
 
Public Accounting
 
Firm” and
 
is incorporated
 
herein by
reference and made a part hereof from the Proxy Statement.
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
166
ITEM 15.
 
EXHIBITS, FINANCIAL STATEMENT
 
SCHEDULES
(a)
 
The following documents are filed as part of this
 
Annual Report:
1.
 
Financial Statements.
 
See index to
 
Financial Statements
 
and Supplementary
 
Data on page
 
119
 
of this
Annual report on Form 10-K.
 
2.
 
Financial Statements Schedules. Schedules are omitted because
 
they are not required or applicable, or
the required information is included in the Financial Statements
 
or related notes thereto.
3.
 
Exhibits. The
 
exhibits filed
 
with or
 
incorporated by
 
reference as
 
part of
 
this Report
 
are set
 
forth in
 
the
Exhibit Index.
 
(b)
 
The documents listed in
 
the Exhibit Index of
 
this Annual Report on
 
Form 10-K are incorporated
 
by reference
or are filed with this Annual Report on Form 10-K, in
 
each case as indicated therein.
 
The following documents are filed as exhibits hereto:
Exhibit No.
Description of Document
2.1*
3.1
3.2
4.1
 
(filed
 
as
 
Exhibit
 
4.1
 
to
 
the
 
Company’s
 
Registration
Statement
 
on
 
Form
 
10
 
(File
 
No.
 
000-56044)
 
filed
 
on
 
April
 
29,
 
2019
 
and
 
incorporated
herein by reference)
4.2
4.3
4.4
4.5
10.1
10.2†‡
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
167
Exhibit No.
Description of Document
10.3‡
10.4‡
10.5>‡
10.6>‡
10.7>‡
10.8>‡
10.9>‡
10.10>‡
10.11>‡
10.12>‡
10.13>
10.14>
10.15>
10.16>
10.17>
10.18>
10.19>
 
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
168
Exhibit No.
Description of Document
10.20‡
10.21‡
10.22‡
10.23
10.24
10.25
10.26†‡
21.1
23.1
23.2
23.3
23.4
31.1
31.2
32.1
95.1
96.1
96.2
96.3
96.4
101
The following materials from the Company’s Annual Report on Form 10-K for the period
ended December
 
31,
 
2022,
 
formatted
 
in
 
iXBRL
 
(Inline
 
Extensible
 
Business
 
Reporting
Language): (i) Consolidated
 
Balance Sheets, (ii)
 
Consolidated Statements of
 
Operations
and Consolidated Statements of
 
Comprehensive Income, (iii)
 
Consolidated Statements
of Stockholders’ Equity/Members’ Capital, (iv) Consolidated
 
Statements of Cash Flows,
(v) related notes to these financial statements and (vi)
 
document and entity information
 
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
169
Exhibit No.
Description of Document
104
Cover Page
 
Interactive Data
 
File (the cover
 
page XBRL
 
tags are embedded
 
within the
Inline XBRL document)
 
____________________
*
 
Portions of this
 
exhibit have been omitted
 
pursuant to Item 601(b)(2)(ii)
 
of Regulation S-K,
 
which portions
will be furnished to the Securities and Exchange Commission
 
upon request.
†
 
Certain schedules and exhibits to this
 
agreement have been omitted pursuant to Item
 
601(a)(5) and Item
601(a)(6)
 
of
 
Regulation
 
S-K.
 
A
 
copy
 
of
 
any
 
omitted
 
schedule
 
and/or
 
exhibit
 
will
 
be
 
furnished
 
to
 
the
Securities and Exchange Commission upon request.
 
‡
 
Portions
 
of
 
this
 
exhibit
 
have
 
been
 
omitted
 
pursuant
 
to
 
Item
 
601(b)(10)(iv)
 
of
 
Regulation
 
S-K,
 
which
portions will be furnished to the Securities and Exchange Commission
 
upon request.
 
>
 
Management contract, compensatory plan or arrangement
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
170
ITEM 16.
 
FORM 10-K SUMMARY
None.
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc. Form 10-K December
 
31, 2022
 
171
SIGNATURES
Pursuant to the
 
requirements of
 
Section 13
 
or 15(d) of
 
the Securities
 
Exchange Act
 
of 1934, the
 
registrant has
duly caused this report to be signed on its behalf by the undersigned,
 
thereunto duly authorized.
Coronado Global Resources Inc.
(Registrant)
By:
/s/ Garold Spindler
Garold Spindler
Managing Director and Chief Executive Officer (as
 
duly
authorized officer and as principal executive officer
 
of
the registrant)
Date: February 21, 2023
Pursuant to the requirements
 
of the Securities Exchange
 
Act of 1934, this
 
report has been
 
signed below by
 
the
following persons, on behalf of the registrant and in the
 
capacities and on the dates indicated.
Name
Title
Date
/s/ Garold Spindler
Managing Director and Chief Executive
Officer (Principal Executive Officer)
February 21, 2023
Garold Spindler
/s/ Gerhard Ziems
Group Chief Financial Officer (Principal
Financial Officer and Principal
Accounting Officer)
February 21, 2023
Gerhard Ziems
/s/ William Koeck
Director
February 21, 2023
William Koeck
/s/ Philip Christensen
Director
February 21, 2023
Philip Christensen
/s/ Greg Pritchard
Director
February 21, 2023
Greg Pritchard
/s/ Laura Tyson
Director
February 21, 2023
Laura Tyson
/s/ Sir Michael Davis
Director
February 21, 2023
Sir Michael Davis
 
 
 
EXHIBIT 21.1
CORONADO GLOBAL RESOURCES INC.
 
SUBSIDIARIES
 
AS OF DECEMBER 31, 2022
Name
Coronado’s Effective Ownership
Place of Incorporation
Buchanan Minerals, LLC
 
100%
Delaware
Buchanan Mining Company LLC
 
100%
Delaware
Coronado Australia Holdings Pty Ltd
100%
Australia
Coronado Coal Corporation
100%
Delaware
Coronado Coal II LLC
100%
Delaware
Coronado Coal LLC
100%
Delaware
Coronado Curragh LLC
 
100%
Delaware
Coronado Curragh Pty Ltd
 
100%
Australia
Coronado Finance Pty Ltd
100%
Australia
Coronado II LLC
100%
Delaware
Coronado IV LLC
 
100%
Delaware
Coronado VA, LLC
100%
Delaware
Curragh Coal Sales Co Pty Ltd
100%
Australia
Curragh Queensland Mining Pty Ltd
100%
Australia
Greenbrier Minerals, LLC
 
100%
Delaware
Greenbrier Smokeless Coal Mining, LLC
100%
Delaware
JEP Mining LLC
 
100%
Delaware
Matoaka Land Company,
 
LLC
 
100%
Delaware
Midland Trail Resources, LLC
 
100%
West Virginia
Powhatan Mid-Vol Coal
 
Sales, LLC
 
100%
Delaware
Mon Valley Minerals
 
LLC
100%
Delaware
 
 
EXHIBIT 23.1
CONSENT OF INDEPENDENT REGISTERED PUBLIC
 
ACCOUNTING FIRM
We consent to the incorporation by reference in
 
the following Registration Statements (including all amendments
thereto):
1.
 
Registration Statement (Form S-3 No. 333-239730) of
 
Coronado Global Resources Inc.;
 
2.
 
Registration Statement
 
(Form S-8
 
No. 333-236597)
 
pertaining to
 
the Coronado
 
Global Resources
 
Inc.
2018 Equity Incentive Plan and the Coronado Global Resources Inc. 2018 Non-Executive Director Plan;
and
 
3.
 
Registration Statement
 
(Form S-8
 
No. 333-249566)
 
pertaining to
 
the Coronado
 
Global Resources
 
Inc.
2018 Equity Incentive Plan.
of our reports dated February 21, 2023 with respect to the consolidated financial statements of Coronado Global
Resources, Inc. and the effectiveness of internal control
 
over financial reporting of Coronado Global Resources,
Inc. included
 
in this
 
Annual Report
 
(Form 10-K) of
 
Coronado Global Resources,
 
Inc. for
 
the year
 
ended December
31, 2022.
 
 
/s/ Ernst & Young
Brisbane, Australia
February 21, 2023
ex232p1i0
 
 
Resology Pty Ltd
5 Tristania Court,
Ormiston 4160
ACN # 622 794 834
ABN # 41622794834
 
CONSENT OF BARRY LAY
I, Barry
 
Lay, BSc Geology (Hons);
 
MAusIMM, Managing Director
 
of Resology Pty
 
Ltd prepared Sections
1.3, 1.4,
 
1.6, 5.2,
 
6, 7.1-7.3,
 
8, 9,
 
10, 11
 
of the
 
Technical
 
Report
 
Summary titled
 
“
Coronado
 
Global
Resources
 
Inc.
 
(“Coronado”)
 
Statement
 
of
 
Coal
 
Resources
 
and
 
Reserves
 
for
 
the
 
Curragh
 
Mine
Complex
 
in
 
Accordance
 
with
 
the
 
JORC
 
Code
 
and
 
United
 
States
 
SEC
 
Regulation
 
S-K
 
1300
 
as
 
of
December
 
31,
 
2021
 
Bowen
 
Basin
 
Queensland,
 
Australia
”,
 
dated
 
February
 
21,
 
2022
 
(the
 
“Technical
Report Summary”).
With respect to the portions
 
of the Technical
 
Report Summary that I
 
prepared, I hereby consent
 
to the
filing with the Securities and Exchange Commission
 
of the Technical
 
Report Summary as an exhibit to
the
 
Annual
 
Report
 
on
 
Form
 
10-K
 
for
 
the
 
year
 
ended
 
December
 
31,
 
2022
 
(the
 
“Annual
 
Report”)
 
of
Coronado Global
 
Resources Inc. (the
 
“Company”) and
 
to the
 
incorporation by reference
 
of the
 
Technical
Report Summary in the Company’s
 
Registration Statements on Form S-3 (No.
 
333-239730) and Form
S-8 (Nos. 333- 236597 and 333-249566) (the “Registration Statements”).
I hereby
 
further
 
consent
 
to
 
the
 
inclusion
 
or
 
incorporation
 
by reference
 
in
 
the
 
Annual
 
Report
 
and
 
the
Registration Statements
 
of references
 
to my
 
name (including
 
status as
 
an expert
 
or qualified
 
person
(as
 
defined
 
in
 
Item
 
1300
 
of
 
Regulation
 
S-K))
 
and
 
the
 
information
 
derived
 
from
 
the
 
portions
 
of
 
the
Technical Report Summary that I
 
prepared, including any
 
quotation therefrom or
 
summarization thereof.
Date: February 15, 2023
/s/ Barry Lay
 
Name: Barry Lay
Managing Director
ex233p1i0
 
 
Coronado Curragh Pty Ltd
ABN 90 009 362 565
Level 33, Central Plaza One, 345 Queen Street
GPO Box 51, Brisbane QLD 4000
T:
 
+61 7 3031 7777 |
F:
 
+61 7 3229 7402
 
Private Mail Bag, Blackwater QLD 4717
T:
 
+61 7 4986 9211 |
F:
 
+61 7 4986 9361
www.coronadoglobal.com
 
CONSENT OF PAUL
 
WOOD
I, Paul Wood, B. Eng.; MAusIMM(CP), Senior Life of
 
Mine Planner of Coronado Curragh Pty Ltd, a
 
wholly owned
subsidiary of Coronado
 
Global Resources Inc.
 
(the “Company”), prepared
 
Sections 1.1, 1.2,
 
1.5, 1.7 through
 
to
1.11,
 
2 through to
 
5, 7.4 and
 
12 through
 
to 26
 
and reviewed
 
all other
 
sections of
 
the technical
 
report summary
titled “
Coronado Global
 
Resources Inc. (
 
“Coronado”) Statement
 
of Coal
 
Resources and Reserves
 
for the
 
Curragh
Mine Complex in Accordance with the
 
JORC Code and United States SEC
 
Regulation S-K 1300 as of December
31, 2021 Bowen Basin Queensland, Australia
,” dated February 21, 2022 (the “Technical
 
Report Summary”).
With respect to the portions of the Technical
 
Report Summary that I prepared, I hereby
 
consent to the filing with
the
 
Securities
 
and
 
Exchange
 
Commission
 
of
 
the
 
Technical
 
Report
 
Summary
 
as
 
an
 
exhibit
 
to
 
the
 
Company’s
Annual
 
Report
 
on
 
Form
 
10-K
 
for
 
the
 
year
 
ended
 
December
 
31,
 
2022
 
(the
 
“Annual
 
Report”)
 
and
 
to
 
the
incorporation by reference of the Technical Report Summary in the Company’s Registration Statements on Form
S-3 (No. 333-239730) and Form S-8 (Nos. 333- 236597 and
 
333-249566) (the “Registration Statements”).
I hereby further consent to the inclusion
 
or incorporation by reference in the
 
Annual Report and the Registration
Statements of references to my name (including status as an expert or qualified person (as defined in Item 1300
of
 
Regulation
 
S-K))
 
and
 
the
 
information
 
derived
 
from
 
the
 
portions
 
of
 
the
 
Technical
 
Report
 
Summary
 
that
 
I
prepared, including any quotation therefrom or summarization thereof
 
.
February 14, 2023
/s/ Paul Wood
 
Name: Paul Wood
 
ex234p1i0
582 Industrial Park Road, Bluefield, VA 24605-9364
 
■
Phone 276.322.5467
www.mma1.com
 
■
 
info@gmail.com
 
ENERGY & MINERAL RESOURCES
 
■
 
HYDROGEOLOGY & GEOLOGY
 
■
 
GEOPHYSICAL LOGGING SERVICES
CARBON MANAGEMENT
 
■
 
EXPERT WITNESS TESTIMONY
 
■
 
MINING ENGINEERING
 
■
 
PETROLEUM ENGINEERING
CONSENT OF MARSHALL MILLER & ASSOCIATES,
 
INC.
Marshall Miller
 
& Associates,
 
Inc. (
MM&A
), a third-party
 
firm comprising
 
mining experts,
 
prepared the
technical report summaries
 
identified below, each dated
 
February 15, 2023,
 
relating to estimates
 
of coal
resources and reserves of Coronado Global Resources Inc. (the “Company”) as of December 31,
 
2022
(the
 
“Technical
 
Report
 
Summaries”).
 
Specifically,
 
MM&A
 
prepared
 
the
 
following
 
Technical
 
Report
Summaries:
1.
 
Technical
 
Report Summary
 
entitled
“Coronado Global
 
Resources Inc.
 
(“Coronado”), Statement
of Coal Resources and Reserves for the Buchanan Mine Complex in Accordance with the
 
JORC
Code
 
and
 
United
 
States
 
SEC
 
Standards
 
as
 
of
 
December
 
31,
 
2022
 
Central
 
Appalachian
 
Coal
Basin Virginia, USA”
;
2.
 
Technical
 
Report Summary
 
entitled
“Coronado Global
 
Resources Inc.
 
(“Coronado”), Statement
of Coal Resources
 
and Reserves
 
for the Logan
 
County Complex
 
in Accordance with
 
the JORC
Code
 
and
 
United
 
States
 
SEC
 
Standards
 
as
 
of
 
December
 
31,
 
2022
 
Central
 
Appalachian
 
Coal
Basin West Virginia, USA”
; and
3.
 
Technical
 
Report Summary
 
entitled
“Coronado Global
 
Resources Inc.
 
(“Coronado”), Statement
of
 
Coal
 
Resources
 
and
 
Reserves
 
for
 
the
 
Mon
 
Valley
 
Complex
 
Upper
 
Freeport
 
Holdings
 
in
Accordance with
 
the JORC
 
Code and
 
United States
 
SEC Standards
 
as of
 
December 31,
 
2022
Northern Appalachian Coal Basin Pennsylvania, USA.”
MM&A hereby
 
consents
 
to the
 
filing with
 
the
 
Securities
 
and Exchange
 
Commission
 
of the
 
Technical
Report
 
Summaries
 
as
 
exhibits
 
to
 
the
 
Company’s
 
Annual
 
Report
 
on
 
Form
 
10-K
 
for
 
the
 
year
 
ended
December 31, 2022 (the
 
“Annual Report”) and to
 
the incorporation by reference of
 
the Technical Report
Summaries in
 
the Company’s
 
Registration Statements
 
on Form
 
S-3 (No.
 
333-239730) and
 
Form S-8
(Nos. 333- 236597 and 333-249566) (the “Registration
 
Statements”).
MM&A hereby further consents to the inclusion or incorporation
 
by reference in the Annual Report and
the Registration Statements of
 
references to the MM&A
 
name (including status as
 
an expert or qualified
person (as
 
defined
 
in Item
 
1300 of
 
Regulation
 
S-K))
 
and the
 
information
 
derived
 
from the
 
Technical
Report Summaries, including any quotation therefrom or summarization
 
thereof.
Date:
 
February 15, 2023
Name:
 
/s/ Justin S. Douthat
Title:
 
Executive Vice President
 
(MM&A Representative)
 
 
 
EXHIBIT 31.1
CERTIFICATION
I, Garold Spindler, certify that:
1. I have reviewed this Annual Report on Form 10-K
 
of Coronado Global Resources Inc.;
2. Based on my
 
knowledge, this report
 
does not contain
 
any untrue statement
 
of a material fact
 
or omit to state
a
 
material
 
fact
 
necessary
 
to
 
make
 
the
 
statements
 
made,
 
in
 
light
 
of
 
the
 
circumstances
 
under
 
which
 
such
statements were made, not misleading with respect to the period
 
covered by this report;
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly
present in
 
all material
 
respects the
 
financial condition,
 
results of
 
operations and
 
cash flows
 
of the
 
registrant as
of, and for, the periods presented
 
in this report;
4. The
 
registrant’s other certifying
 
officer and I
 
are responsible
 
for establishing and
 
maintaining disclosure
 
controls
and procedures (as
 
defined in Exchange
 
Act Rules 13a-15(e) and
 
15d-15(e)) and internal
 
control over financial
reporting (as defined in Exchange Act Rules 13a-15(f)
 
and 15d-15(f) for the registrant and have:
(a) Designed
 
such
 
disclosure
 
controls
 
and
 
procedures,
 
or
 
caused
 
such
 
disclosure
 
controls
 
and
procedures
 
to
 
be
 
designed
 
under
 
our
 
supervision,
 
to
 
ensure
 
that
 
material
 
information
 
relating
 
to
 
the
registrant, including
 
its consolidated
 
subsidiaries, is
 
made known
 
to us
 
by others
 
within those
 
entities,
particularly during the period in which this report is being prepared;
(b) Designed such internal control over financial reporting,
 
or caused such internal control over financial
reporting to be designed under our
 
supervision, to provide reasonable assurance regarding the reliability
of financial reporting
 
and the preparation
 
of financial statements
 
for external purposes in
 
accordance with
generally accepted accounting principles;
(c) Evaluated the
 
effectiveness of
 
the registrant’s
 
disclosure controls
 
and procedures
 
and presented
 
in
this report our
 
conclusions about
 
the effectiveness
 
of the disclosure
 
controls and
 
procedures, as of
 
the
end of the period covered by this report based on such
 
evaluation; and
(d) Disclosed
 
in
 
this
 
report
 
any
 
change
 
in
 
the
 
registrant’s
 
internal
 
control
 
over
 
financial
 
reporting
 
that
occurred during the
 
registrant’s most recent fiscal
 
quarter (the registrant’s fourth
 
fiscal quarter in
 
the case
of an
 
Annual Report)
 
that has
 
materially affected or
 
is reasonably
 
likely to
 
materially affect, the
 
registrant’s
internal control over financial reporting; and
5. The registrant’s
 
other certifying
 
officer and I
 
have disclosed,
 
based on
 
our most
 
recent evaluation
 
of internal
control over
 
financial reporting,
 
to the
 
registrant’s
 
auditors and
 
the audit
 
committee of
 
the registrant’s
 
board of
directors (or persons performing the equivalent functions):
(a) All significant deficiencies and material weaknesses in
 
the design or operation of internal
 
control over
financial
 
reporting
 
which
 
are
 
reasonably
 
likely
 
to
 
adversely
 
affect
 
the
 
registrant’s
 
ability
 
to
 
record,
process, summarize and report financial information; and
(b) Any
 
fraud,
 
whether
 
or
 
not
 
material,
 
that
 
involves
 
management
 
or
 
other
 
employees
 
who
 
have
 
a
significant role in the registrant’s internal control over
 
financial reporting.
Date: February 21, 2023
/s/ Garold Spindler
Garold Spindler
Managing Director and Chief Executive Officer
 
 
 
EXHIBIT 31.2
CERTIFICATION
I, Gerhard Ziems, certify that:
1. I have reviewed this Annual Report on Form 10-K
 
of Coronado Global Resources Inc.;
2. Based on my
 
knowledge, this report
 
does not contain
 
any untrue statement
 
of a material fact
 
or omit to state
a
 
material
 
fact
 
necessary
 
to
 
make
 
the
 
statements
 
made,
 
in
 
light
 
of
 
the
 
circumstances
 
under
 
which
 
such
statements were made, not misleading with respect to the period
 
covered by this report;
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly
present in
 
all material
 
respects the
 
financial condition,
 
results of
 
operations and
 
cash flows
 
of the
 
registrant as
of, and for, the periods presented
 
in this report;
4. The
 
registrant’s other certifying
 
officer and I
 
are responsible
 
for establishing and
 
maintaining disclosure
 
controls
and procedures (as
 
defined in Exchange
 
Act Rules 13a-15(e) and
 
15d-15(e)) and internal
 
control over financial
reporting (as defined in Exchange Act Rules 13a-15(f)
 
and 15d-15(f)
 
for the registrant and have:
(a) designed
 
such
 
disclosure
 
controls
 
and
 
procedures,
 
or
 
caused
 
such
 
disclosure
 
controls
 
and
procedures
 
to
 
be
 
designed
 
under
 
our
 
supervision,
 
to
 
ensure
 
that
 
material
 
information
 
relating
 
to
 
the
registrant, including
 
its consolidated
 
subsidiaries, is
 
made known
 
to us
 
by others
 
within those
 
entities,
particularly during the period in which this report is being prepared;
(b) Designed such internal control over financial reporting,
 
or caused such internal control over financial
reporting to be designed under our
 
supervision, to provide reasonable assurance regarding the reliability
of financial reporting
 
and the preparation
 
of financial statements
 
for external purposes in
 
accordance with
generally accepted accounting principles;
(c) Evaluated the
 
effectiveness of
 
the registrant’s
 
disclosure controls
 
and procedures
 
and presented
 
in
this report our
 
conclusions about
 
the effectiveness
 
of the disclosure
 
controls and
 
procedures, as of
 
the
end of the period covered by this report based on such
 
evaluation; and
(d) Disclosed
 
in
 
this
 
report
 
any
 
change
 
in
 
the
 
registrant’s
 
internal
 
control
 
over
 
financial
 
reporting
 
that
occurred during the
 
registrant’s most recent fiscal
 
quarter (the registrant’s fourth
 
fiscal quarter in
 
the case
of an
 
Annual Report)
 
that has
 
materially affected or
 
is reasonably
 
likely to
 
materially affect, the
 
registrant’s
internal control over financial reporting; and
 
5. The registrant’s
 
other certifying
 
officer and I
 
have disclosed,
 
based on
 
our most
 
recent evaluation
 
of internal
control over
 
financial reporting,
 
to the
 
registrant’s
 
auditors and
 
the audit
 
committee of
 
the registrant’s
 
board of
directors (or persons performing the equivalent functions):
(a) All significant deficiencies and material weaknesses in
 
the design or operation of internal
 
control over
financial
 
reporting
 
which
 
are
 
reasonably
 
likely
 
to
 
adversely
 
affect
 
the
 
registrant’s
 
ability
 
to
 
record,
process, summarize and report financial information; and
(b) Any
 
fraud,
 
whether
 
or
 
not
 
material,
 
that
 
involves
 
management
 
or
 
other
 
employees
 
who
 
have
 
a
significant role in the registrant’s internal control over financial
 
reporting.
Date: February 21, 2023
/s/ Gerhard Ziems
Gerhard Ziems
Group Chief Financial Officer
 
 
 
 
EXHIBIT 32.1
CERTIFICATIONS
 
PURSUANT TO
18 U.S.C. SECTION 1350,
AS ADOPTED PURSUANT TO
SECTION 906 OF THE SARBANES-OXLEY ACT OF
 
2002
In connection with the Annual Report of Coronado Global
 
Resources Inc. (the “Company”) on Form 10-K
 
for the
year ended December 31,
 
2022, as filed with the
 
Securities and Exchange Commission
 
on the date hereof
 
(the
“Report”),
 
each
 
of
 
the
 
undersigned
 
officers
 
of
 
the
 
company
 
certifies,
 
pursuant
 
to
 
18
 
U.S.C.
 
Section 1350,
 
as
adopted pursuant to Section 906 of the Sarbanes-Oxley
 
Act of 2002, that, to such officer’s knowledge:
1.
The
 
Annual
 
Report
 
fully
 
complies
 
with
 
the
 
requirements
 
of
 
Section 13(a) or
 
15(d) of
 
the
 
Securities
Exchange Act of 1934; and
2.
The information
 
contained
 
in the
 
Annual
 
Report fairly
 
presents,
 
in all
 
material respects,
 
the financial
condition and results of operations of
 
the Company as of the
 
dates and for the periods
 
expressed in the
Report.
/s/ Garold Spindler
Garold Spindler
Managing Director and Chief Executive Officer
/s/ Gerhard Ziems
Gerhard Ziems
Group Chief Financial Officer
Date: February 21, 2023
The foregoing certification is being furnished
 
solely pursuant to 18 U.S.C. Section
 
1350 and is not being filed as
part of the Report or as a separate disclosure document.
A signed
 
original of
 
this written
 
statement required
 
by Section 906
 
has been
 
provided to
 
the Company
 
and will
be retained by the Company and furnished to the Securities
 
and Exchange Commission or its staff on request.
 
 
EXHIBIT 95.1
Mine Safety Disclosures
Safety is the cornerstone of our Company’s values and is the number one priority for all employees at Coronado
Global
 
Resources.
 
Our
 
mining
 
operation
 
at
 
Curragh,
 
located
 
in
 
Australia,
 
is
 
subject
 
to
 
regulation
 
by
 
the
Queensland Department of Natural Resources, Mine and Energy,
 
or DNRME, under the Coal Mining Safety and
Health Act
 
1999 (Qld).
 
The operation
 
of our
 
mines located
 
in the
 
United States
 
is subject
 
to regulation
 
by the
Mine Safety and Health Administration, or
 
MSHA, under the Federal Mine
 
Safety and Health Act of 1977, or
 
the
Mine Act. MSHA
 
inspects these mines on
 
a regular basis
 
and issues various
 
citations and orders when
 
it believes
a violation has occurred
 
under the Mine Act.
 
We present information
 
below regarding certain
 
mining safety and
health
 
citations
 
that
 
MSHA
 
has
 
issued
 
with
 
respect
 
to
 
our
 
mining
 
operations.
 
In
 
evaluating
 
this
 
information,
consideration should
 
be given
 
to factors
 
such as:
 
(i) the
 
number of
 
citations and
 
orders will
 
vary depending
 
on
the size of the
 
mine; (ii) the number of
 
citations issued will vary from inspector
 
to inspector and mine to
 
mine; and
(iii) citations and
 
orders can be
 
contested and
 
appealed and, in
 
that process, are
 
often reduced
 
in severity and
amount, and are sometimes dismissed. Since MSHA is a branch of the U.S. Department of Labor, its jurisdiction
only applies to our operations in the
 
United States.
 
As such, the mine safety disclosures
 
included herein do not
contain information related to our Australian mines.
Under the Dodd-Frank Act, each
 
operator of a coal
 
or other mine is
 
required to include certain mine
 
safety results
within its
 
periodic reports
 
filed with
 
the Securities
 
and Exchange
 
Commission, or
 
the SEC.
 
As required
 
by the
reporting
 
requirements
 
included
 
in
 
§1503(a)
 
of
 
the
 
Dodd-Frank
 
Act and
 
Item
 
104
 
of
 
Regulation
 
S-K
 
(17
 
CFR
229.104), we present the following
 
items regarding certain mining safety
 
and health matters, for the
 
year ended
December 31, 2022, for each
 
of our U.S. mine
 
locations that are covered
 
under the scope of the
 
Dodd-Frank Act.
The table that
 
follows reflects
 
citations and orders
 
issued to
 
us by MSHA
 
during the year
 
ended December
 
31,
2022.
 
The
 
table
 
only
 
includes
 
those
 
U.S.
 
mines
 
that
 
were
 
issued
 
orders
 
or
 
citations
 
during
 
this
 
period,
 
and
commensurate
 
with
 
SEC
 
regulations,
 
does
 
not
 
reflect
 
orders
 
or
 
citations
 
issued
 
to
 
independent
 
contractors
working at our mines.
 
The proposed assessments
 
for the year ended
 
December 31, 2022, were
 
retrieved from
the MSHA Data Retrieval System, or MSHA DRS, as
 
of January 3, 2023.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(A)
(B)
(C)
(D)
(E)
(F)
(G)
MSHA Mine
ID No.
Mine Name (1)(2)(3)
Section
104
S&S
Citations
Section
104(b)
Orders
Section 104(d)
Citations and
Orders
Section 110(b)(2)
Violations
Section
107(a)
Orders
Total Dollar Value of
MSHA Assessments
Proposed
($ in thousands)
Total Number of
Mining Related
Fatalities
4404856
Buchanan Mine #1
74
—
—
—
—
$ 134.6
—
4609292
Buck Lilly Surface Mine
—
—
—
—
—
0.1
—
4602140
Saunders Prep Plant
13
2
—
—
—
11.8
—
4609217
Powellton #1 Mine
10
—
—
—
—
22.0
—
4609246
Kuhn Ridge
—
—
—
—
—
0.3
—
4609319
Lower War Eagle
30
—
—
—
—
71.5
—
4609563
Eagle No. 1 Mine
25
—
—
—
—
64.3
—
4609583
North Fork Winifrede Deep Mine
8
—
—
—
—
0.7
—
4609101
Toney
 
Fork Surface Mine
2
—
—
—
—
3.3
—
4609514
Muddy Bridge
39
—
—
—
—
93.6
—
4604315
Elk Lick Tipple
—
—
—
—
—
0.7
—
4609560
North Fork Surface Mine
2
—
—
—
—
2.7
—
4609172
Mountaineer Pocahontas No.1
—
—
—
—
—
1.1
—
4609564
Elklick Surface Mine
5
1
—
—
—
4.4
—
Total:
208
3
—
—
—
$ 411.1
—
(1)
 
The definition of “mine” under Section 3
 
of the Mine Act includes
 
the mine, as well as
 
other items used in, or
 
to be used in,
 
or resulting from, the work
 
of extracting
coal, such as land, structures, facilities, equipment, machines,
 
tools and coal preparation facilities. Also, there are
 
instances where the mine name per the
 
MSHA
system differs from the mine name utilized by us.
(2)
 
Idle facilities are
 
not included in
 
the table above
 
unless they received
 
a citation, order
 
or assessment by
 
MSHA during the
 
current quarterly
 
reporting period or
are subject to pending legal actions.
(3)
 
During the year
 
ended December 31,
 
2022, none of the
 
Company’s mines
 
have received written
 
notice from MSHA
 
of a pattern
 
of violations or
 
the potential to
have such a pattern of violations
 
of mandatory health or safety
 
standards that are of such nature
 
as could have significantly and
 
substantially contributed to the
cause and effect of coal or other mine health or safety
 
standards under section 104(e) of the Mine Act.
References used in the table above are as follows:
A. The total number of violations
 
of mandatory health or safety standards that could
 
significantly and substantially contribute to the cause and effect of
 
a coal or other
mine safety or health hazard under section 104 of the
 
Mine Act (30 U.S.C. 814) for which the operator received
 
a citation from MSHA.
B. The total number of orders issued under section
 
104(b) of the Mine Act (30 U.S.C. 814(b)).
C. The total number of citations and orders
 
for unwarrantable failure of the mine operator
 
to comply with mandatory health or safety
 
standards under section 104(d)
of the Mine Act (30 U.S.C. 814(d)).
D. The total number of flagrant violations under section
 
110(b)(2) of the
 
Mine Act.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
E. The total number of imminent danger orders issued
 
under section 107(a) of the Mine Act (30 U.S.C. 817(a)).
F.
 
The total dollar value of proposed assessments from MSHA
 
under the Mine Act (30 U.S.C. 801 et seq.).
G. The total number of mining-related fatalities.
The table below presents legal actions pending before the Federal Mine Safety
 
and Health Review Commission, or FMSHRC, for each of
 
the Company’s U.S. mines as
of December 31, 2022, together with the number of legal
 
actions initiated and the number of legal actions resolved
 
during the year ended December 31, 2022.
Legal Actions Pending as of Last Day
 
of the Year (December 31, 2022) (1)
MSHA
Mine ID
No.
Mine Name
Contests of
Citations
and Orders
(Subpart B)
Contests of
Proposed
Penalties
(Subpart C)
Complaints for
Compensation
(Subpart D)
Complaints of
Discharge,
Discrimination
or Interference
(Subpart E)
Applications of
Temporary Relief
(Subpart F)
Appeals of Judges’
Decisions or
Orders
(Subpart H)
Legal Actions
Initiated
During the Year
Legal Actions
Resolved
During the
Year
4404856
Buchanan Mine #1
—
1
—
—
—
—
4
5
4609563
Eagle No. 1 Mine
—
4
—
—
—
1
11
11
4609514
Muddy Bridge
—
4
—
—
—
1
8
5
4609319
Lower War Eagle
—
1
—
—
—
—
3
2
4609217
Powellton #1 Mine
—
2
—
—
—
—
5
4
4609560
North Fork Surface Mine
—
—
—
—
—
—
1
1
4609564
Elklick Surface Mine
—
1
—
—
—
—
1
—
4602140
Saunders Prep Plant
—
1
—
—
—
—
4
3
Total:
—
14
—
—
—
2
37
31
(1)
 
The legal
 
actions
 
pending
 
shown
 
in the
 
table
 
above
 
have been
 
categorized
 
by
 
type of
 
proceeding
 
with
 
reference
 
to
 
the
 
procedural
 
rules established
 
by the
FMSHRC under 29 CFR Part 2700. Reference to the applicable
 
Subparts under this Rule are listed in the columns
 
above.
(2)
 
Secretary of Labor’s appeals of Administrative Law Judge’s orders
 
denying motion for settlement approval in WEVA
 
2021-0294 and WEVA
 
2022-0403.
ex962p1i0
 
 
Coronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
Buchanan Mine Complex in Accordance with
the JORC Code and United States SEC Regulation S-K 1300 as of December 31, 2022
Central Appalachian Coal Basin
Virginia, USA
February 2023
Prepared for:
Coronado Global Resources Inc.
100 Bill Baker Way
Beckley, West
 
Virginia 25801
Prepared by:
MARSHALL MILLER & ASSOCIATES, INC.
582 Industrial Park Road
Bluefield, Virginia
 
24605
www.mma1.com
 
 
ex962p2i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Statement of Use and Preparation
This
 
Technical
 
Report
 
Summary
 
(
TRS
)
 
was
 
prepared
 
by
Marshall
 
Miller
 
&
 
Associates,
 
Inc.
(
MM&A
)
 
for
 
the
 
sole
 
use
 
of
Coronado
 
Global
 
Resources
 
Inc.
 
(
Coronado
)
and
 
its
 
affiliated
and
 
subsidiary
 
companies
 
and
 
advisors.
 
Copies or
 
references
 
to
 
information
 
in this
 
report
may not be used without the written permission of Coronado.
This
 
report
 
provides
 
a
 
statement
 
of
 
coal
 
resources
 
and
 
coal
 
reserves
 
for
 
Coronado,
 
as
defined
 
under
 
the
Australasian
 
Code
 
for
 
Reporting
 
of
 
Exploration
 
Results,
 
Mineral
Resources
 
and
 
Ore
 
Reserves
(
JORC
 
Code
)
 
as
 
well
 
as
 
under
 
Subpart
 
1300
 
of
 
Regulation
 
S-K
(Regulation S-K 1300)
 
promulgated by
the
United States Securities
 
and Exchange Commission
(
SEC
)
.
 
Subject to the comments below,
 
this report was also prepared
 
in accordance with the
Australasian
 
Code
 
for
 
Public
 
Reporting
 
of
 
Technical
 
Assessments
 
and
 
Valuations
 
of
Mineral Assets
(
VALMIN Code
).
 
The
 
statement
 
is
 
based
 
on
 
information
 
provided
 
by
 
Coronado
 
and
 
reviewed
 
by
Qualified
Persons
 
(
QPs
) who are full-time employees of MM&A.
As
 
noted
 
above,
 
this
 
report
 
is
 
a
 
“Public
 
Report”
 
for
 
the
 
purposes
 
of
 
the
 
VALMIN
 
Code.
 
However,
 
in
 
accordance
 
with
 
paragraph
 
12.1
 
of
 
the
 
VALMIN
 
Code,
 
it
 
is
 
noted
 
that
 
this
report is
 
not a “Valuation
 
of Mineral
 
Assets” and it
 
also does not
 
comply with
 
the following
requirements that apply to “Technical
 
Assessments” (as defined in the VALMIN Code):
This report does not include a determination of the status of tenure (as required
 
by
paragraph 7.2 of the VALMIN
 
Code) on the basis that tenure was separately reviewed
 
by
Coronado’s legal
 
advisors.
This report does not
 
include separate commentary
 
on the reasonableness and quality
 
of the
Resources
 
and
 
Reserves
 
estimates
 
and
 
the
 
basis
 
on
 
which
 
they
 
have
 
been
 
reported
 
(as
required
 
by
 
paragraph
 
7.3
 
of
 
the
 
VALMIN
 
Code).
 
MM&A
 
did
 
not
 
consider
 
that
 
this
 
was
appropriate
 
in
 
circumstances
 
where
 
MM&A
 
was
 
engaged
 
for
 
the
 
specific
 
purpose
 
of
preparing
 
those
 
estimates.
 
However,
 
MM&A
 
notes
 
that,
 
in
 
accordance
 
with
 
its
 
usual
practice,
 
a separate
 
team of
 
MM&A employees
 
undertook a
 
peer review
 
of this
 
report and
confirmed
 
that
 
both
 
the
 
process
 
followed
 
by
 
the
 
authors
 
of
 
this
 
report
 
and
 
the
 
estimates
prepared were reasonable and comply with the requirements
 
of the JORC Code.
 
 
 
 
ex962p2i0
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
The
 
information
 
in
 
this
 
TRS
 
related
 
to
 
coal
 
resources
 
and
 
reserves
 
is
 
based
 
on,
 
and
 
fairly
represents,
 
information
 
compiled by
 
the QPs.
 
At
 
the time
 
of reporting,
 
MM&A’s
 
QPs have
sufficient
 
experience
 
relevant
 
to
 
the
 
style
 
of
 
mineralization
 
and
 
type
 
of
 
deposit
 
under
consideration
 
and
 
to
 
the
 
activity
 
they
 
are
 
undertaking
 
to
 
qualify
 
as
 
a
 
QP
 
as
 
defined
 
by
Regulation S-K
 
1300 and the
 
JORC Code.
 
Each QP
 
consents to
 
the inclusion in
 
this report
 
of
the matters based on their information
 
in the form and context in which it appears.
Marshall
 
Miller &
 
Associates,
 
Inc. (
MM&A
)
 
hereby
 
consents
 
to the
 
use of
 
the information
contained
 
in
 
this
 
report
 
dated
 
December
 
31,
 
2022,
 
relating
 
to
 
estimates
 
of
 
coal
 
resources
and coal reserves controlled by Coronado.
 
Qualified Person:
/s/ Marshall Miller & Associates, Inc.
Date:
February 15, 2023
 
 
ex962p2i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Table
 
of
 
Contents
1
Executive Summary ................................................................
 
................................
 
................1
1.1
Property Description .........................................................................................................
 
1
1.2
Ownership .........................................................................................................................
 
2
1.3
Geology
 
..............................................................................................................................
 
2
1.4
Exploration Status .............................................................................................................
 
2
1.5
Operations and Development ...........................................................................................
 
3
1.6
Mineral Resource ..............................................................................................................
 
3
1.7
Mineral Reserve ................................................................................................................
 
3
1.8
Capital Summary ...............................................................................................................
 
4
1.9
Operating Costs .................................................................................................................
 
5
1.10
Economic Evaluation .........................................................................................................
 
6
1.10.1
Discounted Cash Flow Analysis ...........................................................................
 
8
1.10.2
Sensitivity Analysis ..............................................................................................
 
9
1.11
Permitting
 
..........................................................................................................................
 
9
1.12
Conclusion and Recommendations
 
...................................................................................
 
9
2
Introduction
 
................................
 
................................
 
................................
 
.........................
 
10
2.1
Registrant and Terms
 
of Reference
 
.................................................................................
 
10
2.2
Information Sources ........................................................................................................
 
10
2.3
Personal Inspections .......................................................................................................
 
11
3
Property Description ................................
 
................................
 
................................
 
............
 
12
3.1
Location ...........................................................................................................................
 
12
3.2
Titles, Claims or Leases
 
....................................................................................................
 
12
3.3
Mineral Rights .................................................................................................................
 
12
3.4
Encumbrances .................................................................................................................
 
13
3.5
Other Risks.......................................................................................................................
 
13
4
Accessibility, Climate,
 
Local Resources, Infrastructure and Physiography
 
..............................
 
13
4.1
Topography,
 
Elevation, and Vegetation ..........................................................................
 
13
4.2
Access and Transport ......................................................................................................
 
13
4.3
Proximity to Population Centers .....................................................................................
 
14
4.4
Climate and Length of Operating Season
 
........................................................................
 
14
4.5
Infrastructure ..................................................................................................................
 
14
5
History ................................................................
 
................................
 
................................
 
.
 
15
5.1
Previous Operation
 
..........................................................................................................
 
15
5.2
Previous Exploration .......................................................................................................
 
15
6
Geological Setting, Mineralization and Deposit ................................................................
 
.....
 
15
6.1
Regional, Local and Property Geology ............................................................................
 
15
6.2
Mineralization .................................................................................................................
 
16
 
 
ex962p2i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
6.3
Deposits
 
...........................................................................................................................
 
16
7
Exploration................................
 
................................
 
................................
 
...........................
 
17
7.1
Nature and Extent of Exploration ...................................................................................
 
17
7.2
Non-Drilling Procedures and Parameters
 
.......................................................................
 
19
7.3
Drilling Procedures ..........................................................................................................
 
20
7.4
Hydrology ........................................................................................................................
 
20
7.5
Geotechnical Data ...........................................................................................................
 
20
8
Sample Preparation, Analyses and Security ................................
 
................................
 
..........
 
21
8.1
Prior to Sending to the Lab
 
..............................................................................................
 
21
8.2
Lab Procedures
 
................................................................................................................
 
21
9
Data Verification ................................
 
................................
 
................................
 
..................
 
22
9.1
Procedures of Qualified Person ......................................................................................
 
22
9.2
Limitations
 
.......................................................................................................................
 
22
9.3
Opinion of Qualified Person
 
............................................................................................
 
22
10
Mineral Processing and Metallurgical Testing
 
................................
 
................................
 
.......
 
22
10.1
Testing
 
Procedures
 
..........................................................................................................
 
22
10.2
Relationship of Tests
 
to the Whole
 
.................................................................................
 
23
10.3
Lab Information
 
...............................................................................................................
 
23
10.4
Relevant Results ..............................................................................................................
 
24
11
Mineral Resource Estimates
 
................................
 
................................
 
................................
 
.
 
24
11.1
Assumptions, Parameters and Methodology..................................................................
 
24
11.1.1
Geostatistical Analysis for Classification ...........................................................
 
26
11.2
Qualified Person’s
 
Estimates
 
...........................................................................................
 
28
11.3
Resources Exclusive of Reserves .....................................................................................
 
29
11.3.1
Initial Economic Assessment
 
.............................................................................
 
29
11.4
Qualified Person’s
 
Opinion
 
..............................................................................................
 
30
12
Mineral Reserve Estimates ................................
 
................................
 
................................
 
...
 
30
12.1
Assumptions, Parameters and Methodology..................................................................
 
30
12.2
Qualified Person’s
 
Estimates
 
...........................................................................................
 
32
12.3
Qualified Person’s
 
Opinion
 
..............................................................................................
 
33
13
Mining Methods
 
................................
 
................................
 
................................
 
...................
 
33
13.1
Geotech and Hydrology
 
...................................................................................................
 
33
13.2
Production Rates .............................................................................................................
 
34
13.3
Mining Related Requirements
 
........................................................................................
 
35
13.4
Required Equipment and Personnel ...............................................................................
 
35
14
Processing and Recovery Methods
 
................................
 
................................
 
........................
 
36
14.1
Description or Flowsheet ................................................................................................
 
36
14.2
Requirements for Energy,
 
Water,
 
Material and Personnel ............................................
 
36
15
Infrastructure
 
................................
 
................................
 
................................
 
.......................
 
36
 
 
ex962p2i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
16
Market Studies
 
................................
 
................................
 
................................
 
.....................
 
37
16.1
Market Description
 
..........................................................................................................
 
37
16.2
Price Forecasts
 
.................................................................................................................
 
38
16.3
Contract Requirements ...................................................................................................
 
38
17
Environmental Studies, Permitting and Plans, Negotiations or Agreements
 
with Local
Individuals
 
................................
 
................................
 
................................
 
...................
 
39
17.1
Results of Studies ............................................................................................................
 
39
17.2
Requirements and Plans for Waste
 
Disposal ..................................................................
 
39
17.3
Permit Requirements and Status ....................................................................................
 
39
17.4
Local Plans, Negotiations or Agreements .......................................................................
 
40
17.5
Mine Closure Plans
 
..........................................................................................................
 
40
17.6
Qualified Person’s
 
Opinion
 
..............................................................................................
 
41
18
Capital and Operating Costs
 
................................
 
................................
 
................................
 
..
 
41
18.1
Capital Cost Estimate.......................................................................................................
 
41
18.2
Operating Cost Estimate .................................................................................................
 
42
19
Economic Analysis ................................................................
 
................................
 
................
 
43
19.1
Assumptions, Parameters and Methods .........................................................................
 
43
19.2
Results .............................................................................................................................
 
45
19.3
Sensitivity ........................................................................................................................
 
47
20
Adjacent Properties
 
................................
 
................................
 
................................
 
..............
 
48
20.1
Information Used ............................................................................................................
 
48
21
Other Relevant Data and Information ................................................................
 
...................
 
48
22
Interpretation and Conclusions
 
................................
 
................................
 
.............................
 
49
22.1
Conclusion .......................................................................................................................
 
49
22.2
Risk Factors
 
......................................................................................................................
 
49
22.2.1
Governing Assumptions ....................................................................................
 
50
22.2.2
Limitations
 
.........................................................................................................
 
50
22.2.3
Methodology
 
.....................................................................................................
 
50
22.2.4
Development of the Risk Matrix .......................................................................
 
51
22.2.5
Categorization of Risk Levels and Color Code Convention ...............................
 
53
22.2.6
Description of the Coal Property ......................................................................
 
53
22.2.7
Summary of Residual Risk Ratings ....................................................................
 
53
22.2.8
Risk Factors........................................................................................................
 
54
23
Recommendations ................................
 
................................
 
................................
 
...............
 
60
24
References ................................
 
................................
 
................................
 
...........................
 
60
25
Reliance on Information Provided by the Registrant
 
................................
 
.............................
 
60
F
IGURES
(
IN
R
EPORT
)
Figure 1-1:
 
Coronado Buchanan Mine Complex Property Location Map
 
...........................................
 
2
 
 
ex962p2i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
Figure 1-2:
 
CAPEX
 
................................................................................................................................
 
5
Figure 1-3:
 
OPEX
 
..................................................................................................................................
 
6
Figure 1-4:
 
Sensitivity of NPV
 
..............................................................................................................
 
9
Figure 6-1:
 
Buchanan Stratigraphic Column .....................................................................................
 
16
Figure 7-1: Buchanan Cross-Section, A1 – A2
 
....................................................................................
 
18
Figure 7-2: Buchanan Cross-Section, B1 – B2 ....................................................................................
 
19
Figure 11-1:
 
Histogram of the Total
 
Seam Thickness for the Pocahontas No. 3 Seam Present in the
Buchanan Mine Complex
 
................................................................................................
 
26
Figure 11-2:
 
Scatter plot of the Total
 
Seam Thickness for the Pocahontas No. 3 Seam Present in
the Buchanan Mine Complex .........................................................................................
 
26
Figure 11-3: Variogram
 
of the Total
 
Seam Thickness for the Pocahontas No. 3 Seam
 
Present in the
Buchanan Mine Complex
 
................................................................................................
 
27
Figure 11-4: Result of DHSA for the Pocahontas
 
No. 3 Seam Present in the Buchanan Mine
Complex ..........................................................................................................................
 
28
Figure 11-5:
 
Results of Initial Economic Assessment
 
........................................................................
 
30
Figure 15-1:
 
Buchanan Surface
 
Facilities ..........................................................................................
 
37
Figure 18-1:
 
CAPEX
 
............................................................................................................................
 
41
Figure 19-1:
 
Cash Costs per Tonne
 
...................................................................................................
 
45
Figure 19-2:
 
Sensitivity of NPV
 
..........................................................................................................
 
48
T
ABLES
(
IN
R
EPORT
)
Table 1-1:
 
Coal Resources Summary as of December 31, 2022 .........................................................
 
3
Table 1-2:
 
Coal Summary (ROM (Moist)) as of December 31, 2022
 
...................................................
 
4
Table 1-3:
 
Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022 ...................
 
4
Table 1-4:
 
Life-of-Mine Tonnage,
 
P&L before Tax,
 
and EBITDA .........................................................
 
7
Table 1-5:
 
Project Cash Flow Summary (000)
 
.....................................................................................
 
7
Table 2-1:
 
Information Provided to MM&A by Coronado ................................................................
 
11
Table 11-1:
 
General Reserve and Resource Criteria .........................................................................
 
25
Table 11-2:
 
DHSA Results Summary for Radius from a Central Point
 
..............................................
 
28
Table 11-3:
 
Coal Resources Summary as of December 31, 2022 .....................................................
 
29
Table 11-4:
 
Results of Initial Economic Assessment
 
.........................................................................
 
30
Table 12-1:
 
Coal ROM (Moist) Summary as of December 31, 2022
 
.................................................
 
32
Table 12-2:
 
Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022 ...............
 
33
Table 13-1:
 
Summary of Production by Year (Tonnes
 
x 1,000) ........................................................
 
35
Table 16-1:
 
Quality Specifications by Product ..................................................................................
 
38
Table 17-1:
 
Buchanan Mining Permit ...............................................................................................
 
40
Table 18-1:
 
Estimated Coal Production Taxes
 
and Sales Costs
 
.........................................................
 
43
Table 18-2:
 
Buchanan Mine Operating Costs ...................................................................................
 
43
Table 19-1:
 
Life-of-Mine Tonnage,
 
P&L before Tax,
 
and EBITDA .....................................................
 
45
Table 19-2:
 
Summary of Buchanan Key Financial Performance Metrics (2023-2030) .....................
 
46
Table 19-3:
 
Project Cash Flow Summary (000)
 
.................................................................................
 
47
Table 22-1:
 
Probability Level Table ...................................................................................................
 
51
Table 22-2:
 
Consequence Level Table
 
...............................................................................................
 
52
Table 22-3:
 
Risk Matrix .....................................................................................................................
 
53
Table 22-4:
 
Risk Assessment Matrix .................................................................................................
 
54
Table 22-5:
 
Geological and Coal Resource Risk Assessment (Risks 1 and 2)
 
....................................
 
55
Table 22-6:
 
Environmental (Risks 3 and 4) .......................................................................................
 
56
Table 22-7:
 
Regulatory Requirements (Risk 5) .................................................................................
 
56
 
 
ex962p2i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
Table 22-8:
 
Market and Transportation
 
(Risk 6)
 
...............................................................................
 
57
Table 22-9:
 
Market and Transportation
 
(Risk 7)
 
...............................................................................
 
57
Table 22-10:
 
Methane Management (Risk 8) ...................................................................................
 
58
Table 22-11:
 
Mine Fires (Risk 9)
 
........................................................................................................
 
58
Table 22-12:
 
Availability of Supplies and Equipment (Risk 10)
 
.........................................................
 
59
Table 22-13:
 
Labor – Work Stoppage (Risk 11)
 
.................................................................................
 
59
Table 22-14:
 
Labor – Retirement (Risk 12) .......................................................................................
 
60
Table 25-1:
 
Information from Registran
 
t
 
Relied Upon by MM&A ...................................................
 
60
Appendices
A ..........................................................................................................................
 
MM&A Qualifications
B ......................................................................................................................................................
 
Map
C ................................................................................................................................
 
Glossary of Terms
D .....................................................
 
Initial Economic Assessment for Resources Exclusive
 
of Reserves
E
 
.........................................................................................................................................
 
JORC Table
 
1
 
 
ex962p2i0
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
1
Executive Summary
1.1
Property Description
Coronado
 
Global
 
Resources
 
Inc.
 
(
Coronado
)
authorized
Marshall
 
Miller
 
&
 
Associates,
 
Inc.
(
MM&A
)
to
 
prepare
 
this
 
Technical
 
Report
 
Summary
 
(
TRS
)
 
of
 
its
 
controlled
 
coal
 
resources
 
and
reserves
 
located
 
at
 
the
Buchanan
 
Division
 
(
Buchanan
)
 
in
 
Buchanan
 
and
 
Tazewell
 
Counties,
Virginia
 
(the
Property
).
 
An
 
updated
 
TRS
 
was
 
prepared
 
in
 
February
 
2023
 
due
 
to
 
material
differences
 
in the key
 
financial modifying factors
 
including coal
 
sales price assumptions,
 
operating
costs
 
and
 
capital
 
costs
 
from
 
December
 
31,
 
2021
 
to
 
December
 
31,
 
2022.
 
Coal
 
sales
 
price
assumptions are discussed in
 
Sections 12 and 16
 
of the TRS, while operating costs
 
and capital costs
are discussed in
Sections 18 and 19
 
of the TRS.
 
This report provides
 
a statement
 
of coal resources
and
 
coal
 
reserves
 
for
 
Coronado,
 
as
 
defined
 
under
 
the
Australasian
 
Code
 
for
 
Reporting
 
of
Exploration
 
Results,
 
Mineral
 
Resources
 
and
 
Ore
 
Reserves
(
JORC
 
Code
)
 
as
 
well
 
as
 
under
 
Subpart
1300
 
of
 
Regulation
 
S-K
 
(Regulation
 
S-K
 
1300)
 
promulgated
 
by
 
the
United
 
States
 
Securities
 
and
Exchange
 
Commission (
SEC
)
.
 
This report
 
was also
 
prepared
 
in accordance
 
with the
Australasian
Code
 
for
 
Public
 
Reporting
 
of
 
Technical
 
Assessments
 
and
 
Valuations
 
of
 
Mineral
 
Assets
(
VALMIN
Code
).
Coal
 
resources
 
and
 
coal
 
reserves
 
are
 
herein
 
reported
 
in
 
imperial
 
units
 
of
 
measurement
 
and
 
are
rounded to millions of metric tonnes (
Mt
).
 
The
 
Buchanan
 
No.
 
1
 
Mine
 
Complex
 
is
 
located
 
in
 
Buchanan
 
County
 
in
 
southwest
 
Virginia.
 
The
Property
 
is
 
24
 
kilometers
 
northwest
 
of
 
the
 
town
 
of
 
Richlands,
 
Virginia
 
and
 
65.9
 
kilometers
southeast
 
of
 
Pikeville,
 
Kentucky.
 
The
 
nearest
 
major
 
population
 
centers
 
are
 
Lexington,
 
Kentucky
(290 kilometers northwest)
 
and Roanoke, Virginia
 
(153 kilometers northeast) (see
Figure 1-1
).
 
The
Property
 
is
 
composed
 
of
 
approximately
 
33,577
 
total
 
hectares,
 
of
 
which
 
25,852
 
are
 
leased
 
or
subleased
 
from
 
private
 
landholders
 
under
 
approximately
 
150
 
individual
 
coal
 
lease
 
tracts,
 
and
7,725
 
hectares
 
are
 
owned
 
by
 
Coronado.
 
Subject
 
to
 
Coronado’s
 
exercising
 
its
 
renewal
 
rights
thereunder,
 
all the leases
 
expire upon
 
exhaustion of
 
the relevant
 
coal reserves,
 
which is expected
to occur in 2044.
 
 
 
ex962p2i0 ex962p10i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Figure 1-1:
 
Coronado Buchanan Mine Complex Property Location Map
1.2
Ownership
The
 
Property
 
was
 
formerly
 
controlled
 
by
Consolidation
 
Coal
 
Company
 
(
CONSOL
)
.
 
Mine
development
 
was
 
started
 
by CONSOL
 
in 1983
 
and longwall
 
production began
 
in 1987.
 
Coronado
acquired the Buchanan Mine from CONSOL in March 2016.
1.3
Geology
Operations
 
at
 
the
 
Buchanan
 
Mine
 
Complex
 
extract
 
the
 
Pocahontas
 
No.
 
3
 
coal
 
bed
 
by
 
longwall
mining
 
methods.
 
Strata
 
of
 
economic
 
interest
 
for
 
this
 
TRS
 
are
 
of
 
the
 
Pennsylvanian-age
Pocahontas
 
Formation
 
and
 
the
 
subject
 
Pocahontas
 
No.
 
3
 
seam
 
is the
 
principal
 
coal
 
seam of
 
that
formation.
 
Due to
 
the high value
 
of this
 
low-volatile
 
coking coal,
 
it has been
 
extensively mined
 
in
the
 
region.
 
The
 
seam
 
is
 
situated
 
below
 
drainage
 
throughout
 
the
 
Property
 
and
 
is
 
accessed
 
by
existing mine shafts.
1.4
Exploration Status
The
 
Property
 
has been
 
extensively
 
explored,
 
largely
 
by
 
drilling
 
using
 
continuous
 
coring
 
methods,
rotary
 
drilling
 
but
 
also
 
by
 
obtaining
 
coal
 
measurements
 
at
 
mine
 
exposures,
 
ongoing
 
drilling
associated with
 
degas activities,
 
and by
 
downhole geophysical
 
methods.
 
The majority
 
of the data
was
 
acquired
 
or
 
generated
 
by
 
previous
 
owners
 
of
 
the
 
Property.
 
These
 
sources
 
comprise
 
the
primary
 
data
 
used
 
in
 
the
 
evaluation
 
of
 
the
 
coal
 
resources
 
and
 
coal
 
reserves
 
on
 
the
 
Property.
 
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
MM&A examined
 
the data
 
available for
 
the evaluation
 
and incorporated
 
all pertinent
 
information
into
 
this
 
TRS.
 
Where
 
data
 
appeared
 
to
 
be
 
anomalous
 
or
 
not
 
representative,
 
that
 
data
 
was
excluded from the digital databases and subsequent
 
processing by MM&A.
 
Ongoing
 
exploration
 
has been
 
carried
 
out
 
by
 
Coronado
 
since
 
acquiring the
 
Buchanan
 
Mine.
 
The
exploration data acquired by
 
Coronado has been consistent with past drilling activities.
1.5
Operations and Development
Due
 
to
 
its
 
coal
 
reserve
 
and
 
seam
 
characteristics,
 
the
 
Buchanan
 
No.
 
1
 
Mine
 
operates
 
using
 
the
longwall
 
method.
 
The
 
model
 
was
 
therefore
 
generated
 
with
 
longwall-mining
 
constraints
 
in
 
mind
for
 
Buchanan’s
 
underground
 
resources.
 
The
 
mine
 
produces
 
coal
 
that
 
is
 
suitable
 
for
 
the
 
low-
volatile metallurgical coal markets.
The Buchanan
 
No. 1
 
Mine in
 
Buchanan County,
 
Virginia, is
 
the only
 
active longwall
 
mine currently
being operated by Coronado.
Coronado currently
 
operates a
 
coal preparation
 
plant at
 
Buchanan.
 
The Buchanan Plant
 
operates
at
 
a
 
feed
 
rate
 
of
 
approximately
 
1,270
 
raw
 
tonnes
 
per
 
hour
 
(
tph)
.
 
Processes
 
are
 
typical
 
of
 
those
used in the coal industry and are in use at adjacent coal processing plants.
1.6
Mineral Resource
Mineral
 
resources,
 
representing
 
in-situ
 
coal
 
from
 
a
 
portion
 
of
 
which
 
reserves
 
are
 
derived,
 
are
presented
 
below.
 
A
 
coal
 
resource
 
estimate,
 
summarized
 
in
Table
 
1-1
,
 
was
 
prepared
 
as
 
of
December 31, 2022, for property controlled by Coronado.
Table 1-1:
 
Coal Resources Summary as of December 31, 2022
 
Coal Resource (Dry Tonnes, In Situ, Mt)
Resource Quality (Dry)
Area
Measured
Indicated
Inferred
Total
Ash%
Sulfur%
VM%
Inclusive of Reserves
158.0
10.2
0.0
168.2
25
0.7
16
Exclusive of Reserves
33.9
5.9
0.0
39.8
Total 12/31/2022
191.9
16.1
0.0
208.0
 
Note:
 
Resource tonnes are inclusive of reserve tonnes since they include the in-situ tonnes from which recoverable coal reserves are derived.
Note 2:
 
Coal resources are reported on a dry basis.
 
Surface moisture and inherent moisture are excluded.
Note 3: The Property contains 39.8 Mt of dry, in-place measured and indicated coal resources exclusive of reserves as of December 31, 2022.
1.7
Mineral Reserve
Reserve tonnage
 
estimates provided
 
herein report
 
coal reserves
 
derived from
 
the in-situ resource
tons
 
presented
 
in
Table
 
1-1
,
 
and
 
not
 
in
 
addition
 
to
 
coal
 
resources.
 
Proven
 
and
 
probable
 
coal
reserves
 
were
 
derived
 
from
 
the
 
defined
 
coal
 
resource
 
considering
 
relevant
 
mining,
 
processing,
infrastructure,
 
economic
 
(including
 
estimates
 
of
 
capital,
 
revenue,
 
and
 
cost),
 
marketing,
 
legal,
environmental,
 
socio-economic
 
and regulatory
 
factors.
 
The
 
Resource
 
estimate
 
has been
 
used
 
as
the
 
basis
 
for
 
this
 
Reserve
 
calculation,
 
which
 
utilizes
 
a
 
reasonable
 
preliminary
 
feasibility
 
study,
 
a
life-of-mine
 
(
LOM
) mine plan
 
and practical
 
recovery factors.
 
Production modeling
 
was completed
with an
 
effective
 
start date
 
of October
 
1, 2022.
 
Additions and
 
depletion have
 
been used
 
to bring
the Reserve estimate forward
 
to December 31, 2022.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Factors
 
that
 
would
 
typically
 
preclude
 
conversion
 
of
 
a
 
coal
 
resource
 
to
 
coal
 
reserve,
 
include
 
the
following:
 
inferred
 
resource
 
classification;
 
absence
 
of
 
coal
 
quality;
 
poor
 
mine
 
recovery;
 
lack
 
of
access; geological
 
encumbrances
 
associated
 
with
 
overlying
 
and underlying
 
strata;
 
seam thinning;
structural
 
complication;
 
and
 
insufficient
 
exploration
 
have
 
all
 
been
 
considered.
 
Reserve
consideration
 
excludes
 
those
 
portions
 
of
 
the
 
resource
 
area
 
which
 
exhibit
 
the
 
aforementioned-
geological and operational encumbrances.
 
Coal reserves are
 
presented on
 
a run-of-mine
 
(
ROM
) basis in
Table
 
1-2
.
 
Proven and
 
probable coal
reserves
 
were
 
derived
 
from
 
the
 
defined
 
in-situ
 
coal
 
resource
 
considering
 
relevant
 
processing,
economic
 
(including
 
technical
 
estimates
 
of
 
capital,
 
revenue,
 
and
 
cost),
 
marketing,
 
legal,
environmental,
 
socioeconomic, and regulatory
 
factors.
 
The proven
 
and probable
 
coal reserves
 
on
the Property are summarized below in
Table 1-3
.
Table 1-2:
 
Coal Summary (ROM (Moist)) as of December 31, 2022
 
Demonstrated Coal Reserves (Mt, Moist ROM)
Quality (Dry)
 
By Reliability Category
By Mining Type
By Control Type
Area /
Mine
Proven
Probable
Total
Surface
UG
Owned
Leased
Subleased
Ash
Sulfur
Vol
Buchanan
144.9
8.7
153.6
0.0
153.6
21.7
127.9
4.0
42
0.7
12
Table 1-3:
 
Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022
 
Demonstrated Coal Reserves (Wet Tons,
 
Washed or Direct Shipped, Mt)
Quality (Dry Basis)
 
By Reliability Category
By Mining Type
By Control Type
Area / Mine
Proven
Probable
Total
Surface
UG
Owned
Leased
Subleased
Ash%
Sulfur%
VM%
Buchanan Mine Complex
87.5
5.4
92.9
0.0
92.9
14.4
75.9
2.6
6
0.7
19
 
Note: Marketable reserve tonnes are reported on a moist basis, including a combination of surface and inherent moisture.
 
The combination of
surface and inherent moisture is modeled at 6-percent.
 
Actual product moisture is dependent upon multiple geological factors, operational
factors,
 
and product contract specifications and can exceed 8-percent.
 
As such, the modeled moisture values provide a level of conservatism
for reserve reporting.
In
 
summary,
 
Coronado
 
controls
 
a
 
total
 
of
 
92.9
 
Mt
 
(moist
 
basis)
 
of
 
marketable
 
coal
 
reserves,
 
at
Buchanan,
 
as
 
of
 
December
 
31,
 
2022.
 
Of
 
that
 
total,
 
94
 
percent
 
are
 
proven,
 
and
 
6
 
percent
 
are
probable.
 
There are
 
14.4 Mt
 
of owned
 
coal reserves
 
and 75.9
 
Mt of
 
leased coal
 
reserves and
 
2.6
Mt of
 
subleased reserves.
 
All the Buchanan
 
reserves are
 
considered suitable
 
for the
 
metallurgical
coal market, and all of the Buchanan reserves are assigned.
1.8
Capital Summary
Coronado
 
provided
 
MM&A
 
with
 
an
 
inventory
 
of
 
operating
 
equipment
 
available
 
at
 
Buchanan.
 
MM&A’s
 
capital
 
schedules assume
 
that
 
major
 
equipment
 
rebuilds
 
occur over
 
the
 
course
 
of
 
each
machine’s
 
remaining
 
assumed
 
operating
 
life.
 
Replacement
 
equipment
 
was
 
scheduled
 
based
 
on
MM&A’s
 
experience and
 
knowledge of
 
mining equipment
 
and industry
 
standards
 
with respect
 
to
the useful life of such equipment.
 
A summary of the estimated capital for the
 
Property is provided
in
Figure 1-2
 
below.
 
 
ex962p2i0 ex962p13i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Figure 1-2:
 
CAPEX
1.9
Operating Costs
Coronado
 
provided
 
historical
 
and
 
preliminary
 
5-year
 
projections
 
of operating
 
costs
 
for
 
Buchanan
for
 
MM&A’s
 
review.
 
MM&A
 
used
 
the
 
historical
 
and/or
 
budget
 
cost
 
information
 
as
 
a
 
reference
and
 
developed
 
personnel
 
schedules
 
for
 
the
 
mine
 
and
 
support
 
facilities.
 
Hourly
 
labor
 
rates
 
and
salaries
 
were
 
based
 
upon
 
information
 
contained
 
in
 
Coronado’s
 
financial
 
summaries.
 
Fringe-
benefit
 
costs
 
were
 
developed
 
for
 
vacation
 
and
 
holidays,
 
federal
 
and
 
state
 
unemployment
insurance,
 
retirement,
 
workers’
 
compensation
 
and
 
pneumoconiosis,
 
casualty
 
and
 
life
 
insurance,
healthcare, and bonuses.
 
A cost factor
 
for mine supplies
 
was developed that
 
relates expenditures
to
 
mine advance
 
rates
 
for
 
roof-control
 
costs
 
and other
 
mine-supply costs
 
at
 
underground
 
mines.
 
Other
 
factors
 
were
 
developed
 
for
 
maintenance
 
and
 
repair
 
costs,
 
rentals,
 
mine
 
power,
 
outside
services and other direct mining costs.
 
Operating
 
costs
 
factors
 
were
 
also
 
developed
 
for
 
the
 
coal
 
preparation
 
plant
 
processing,
 
refuse
handling, coal loading, property taxes,
 
and insurance and bonding.
 
Appropriate royalty
 
rates were
assigned
 
for
 
production
 
from
 
leased
 
coal
 
lands,
 
and
 
sales
 
taxes
 
were
 
calculated
 
for
 
state
severance taxes,
 
the federal black lung excise tax,
 
and federal and state reclamation
 
fees.
A summary of the projected operating costs for the Property
 
is provided in
Figure 1-3
.
 
 
ex962p2i0 ex962p14i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
Figure 1-3:
 
OPEX
1.10
Economic Evaluation
The
 
pre-feasibility
 
financial
 
model
 
prepared
 
for
 
this
 
TRS
 
was
 
developed
 
to
 
test
 
the
 
economic
viability
 
of
 
the
 
coal
 
resource
 
area.
 
The
 
results
 
of
 
this
 
financial
 
model
 
are
 
not
 
intended
 
to
represent
 
a
 
bankable
 
feasibility
 
study,
 
required
 
for
 
financing
 
of
 
any
 
current
 
or
 
future
 
mining
operations contemplated
 
for the Coronado properties,
 
but are intended to
 
establish the economic
viability
 
of
 
the
 
estimated
 
coal
 
reserves.
 
Cash
 
flows
 
are
 
simulated
 
on an
 
annual basis
 
in
 
nominal
dollars
 
assuming
 
a
 
2%
 
inflation
 
rate
 
based
 
on
 
projected
 
production
 
from
 
the
 
coal
 
reserves.
 
The
discounted cash flow analysis presented herein
 
is based on an effective date of January 1, 2023.
 
On an un-levered basis, the net
 
present value (
NPV
) of the project cash flow
 
after taxes represents
the Enterprise
 
Value of
 
the project.
 
The project cash
 
flow,
 
excluding debt
 
service, is calculated
 
by
subtracting direct
 
and indirect
 
operating expenses
 
and capital
 
expenditures from
 
revenue.
 
Direct
costs
 
include
 
labor,
 
operating
 
supplies,
 
maintenance
 
and
 
repairs,
 
facilities
 
costs
 
for
 
materials
handling,
 
coal
 
preparation,
 
refuse
 
disposal,
 
coal
 
loading,
 
reclamation
 
and
 
general
 
and
administrative costs.
 
Indirect costs include statutory and legally agreed
 
upon fees related to direct
extraction
 
of
 
the
 
mineral.
 
The
 
indirect
 
costs
 
are
 
the
 
federal
 
black
 
lung
 
tax,
 
federal
 
and
 
state
reclamation taxes, property
 
taxes, coal production royalties,
 
and income taxes.
 
Table
 
1-4
 
shows LOM tonnage, profit
 
& loss (
P&L
), and earnings before income tax,
 
depreciation &
amortization (
EBITDA
) for Buchanan.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
Table 1-4:
 
Life-of-Mine Tonnage,
 
P&L before Tax,
 
and EBITDA
 
LOM
LOM
P&L
LOM
EBITDA
 
Tonnes
Pre-Tax P&L
Per Tonne
EBITDA
Per Tonne
Buchanan
92,923
$4,280,077
$46.06
$6,174,578
$66.45
As
 
shown
 
in
Table
 
1-4,
 
the
 
Buchanan
 
Mine
 
shows
 
positive
 
EBITDA
 
over
 
the
 
LOM.
 
Overall,
 
the
Coronado
 
consolidated
 
operations
 
show
 
positive
 
LOM
 
P&L
 
and
 
LOM
 
EBITDA
 
of
 
$4.3
 
billion
 
and
$6.2 billion, respectively.
 
Coronado’s
 
consolidated Buchanan
 
cash flow
 
summary in
 
nominal dollars
 
assuming a
 
2% interest
rate, excluding debt
 
service, is shown in
Table 1-5
 
below.
Table 1-5:
 
Project Cash Flow Summary (000)
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
Total
2023
2024
2025
2026
2027
Production & Sales tonnes
92,924
3,786
3,811
4,363
4,446
5,112
Total Revenue
$14,194,747
$675,923
$544,435
$574,963
$592,283
$692,273
EBITDA
$6,174,578
$295,749
$209,789
$206,065
$217,757
$294,147
Net Income
$3,368,328
$179,131
$103,854
$91,899
$90,456
$138,196
Net Cash Provided by Operating Activities
$5,181,846
$188,692
$200,765
$186,416
$195,463
$245,493
Purchases of Property, Plant, and
 
Equipment
$(1,448,505)
$(135,766)
$(130,803)
$(111,896)
$(122,768)
$(101,557)
Net Cash Flow
$3,733,342
$52,926
$69,962
$74,520
$72,695
$143,936
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2028
2029
2030
2031
2032
2033
Production & Sales tonnes
6,242
6,462
6,200
5,444
6,226
4,814
Total Revenue
$862,187
$910,476
$890,951
$798,054
$930,819
$734,119
EBITDA
$431,599
$469,093
$445,727
$357,721
$458,785
$288,024
Net Income
$240,334
$262,860
$254,666
$197,893
$280,873
$159,996
Net Cash Provided by Operating Activities
$339,674
$386,828
$379,000
$320,798
$362,834
$277,786
Purchases of Property, Plant, and
 
Equipment
$(70,382)
$(50,228)
$(71,184)
$(59,572)
$(49,573)
$(65,133)
Net Cash Flow
$269,292
$336,600
$307,815
$261,226
$313,262
$212,653
 
 
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2034
2035
2036
2037
2038
2039
Production & Sales tonnes
6,474
6,423
5,249
3,447
3,009
2,914
Total Revenue
$1,007,101
$1,019,070
$849,433
$569,043
$506,626
$500,552
EBITDA
$501,730
$526,779
$424,763
$211,060
$168,369
$216,035
Net Income
$326,060
$344,381
$266,105
$105,424
$79,886
$116,181
Net Cash Provided by Operating Activities
$372,442
$424,330
$368,367
$223,842
$158,704
$177,921
Purchases of Property, Plant, and
 
Equipment
$(54,007)
$(69,272)
$(64,919)
$(77,383)
$(43,070)
$(35,719)
Net Cash Flow
$318,435
$355,058
$303,449
$146,459
$115,634
$142,202
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2040
2041
2042
2043
2044
2045
Production & Sales tonnes
2,093
2,254
1,703
1,714
737
-
Total Revenue
$366,649
$402,822
$309,918
$317,808
$139,240
$-
EBITDA
$108,191
$153,415
$80,892
$106,596
$2,291
$-
Net Income
$34,854
$71,326
$19,002
$46,332
$(34,676)
$(3,773)
Net Cash Provided by Operating Activities
$119,167
$128,269
$89,128
$92,258
$24,650
$(47,861)
Purchases of Property, Plant, and
 
Equipment
$(50,131)
$(46,604)
$(24,930)
$(13,606)
$-
$-
Net Cash Flow
$69,036
$81,665
$64,198
$78,652
$24,650
$(47,861)
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2046
2047
2048
2049
2050
2051
Production & Sales tonnes
-
-
-
-
-
-
Total Revenue
$-
$-
$-
$-
$-
$-
EBITDA
$-
$-
$-
$-
$-
$-
Net Income
$(1,534)
$(785)
$(403)
$(209)
$(0)
$(0)
Net Cash Provided by Operating Activities
$(16,273)
$(8,299)
$(4,232)
$(4,317)
$-
$-
Purchases of Property, Plant, and
 
Equipment
$-
$-
$-
$-
$-
$-
Net Cash Flow
$(16,273)
$(8,299)
$(4,232)
$(4,317)
$-
$-
Consolidated
 
cash
 
flows
 
are
 
driven
 
by
 
annual
 
sales
 
tonnage,
 
which
 
at
 
steady-state
 
level
 
ranges
from
 
a
 
peak
 
of
 
6.5
 
million
 
tonnes
 
in
 
2034
 
to
 
a
 
low
 
of
 
0.7
 
million
 
tonnes
 
in
 
2044.
 
Projected
consolidated
 
revenue
 
ranges
 
from
 
$317.8
 
million
 
to
 
$1.019
 
billion
 
at
 
a
 
steady
 
state.
 
Revenue
totals $14.2 billion for the project’s
 
life.
Consolidated
 
cash
 
flow
 
from
 
operations
 
is
 
positive
 
throughout
 
the
 
projected
 
operating
 
period,
with
 
the
 
exception
 
of
 
post-production
 
years,
 
due
 
to
 
end-of-mine
 
reclamation
 
spending.
 
Consolidated cash flow from operations peaks
 
at $424.3 million in 2035 and totals $5.2 billion over
the project’s
 
life.
 
Capital expenditures
 
total $602.8
 
million through 2027
 
and $1.4 billion
 
over the
project’s life.
 
1.10.1
Discounted Cash Flow Analysis
Cash flow after
 
tax, but before
 
debt service, generated
 
over the life
 
of the project
 
was discounted
to NPV
 
at a 10.0%
 
discount rate,
 
which represents
 
Coronado’s
 
estimate of
 
the nominal dollar,
 
risk
adjusted
 
weighted
 
average
 
cost
 
of
 
capital
 
(
WACC
)
 
for
 
likely
 
market
 
participants
 
if
 
the
 
subject
reserves
 
were
 
offered
 
for
 
sale.
 
On
 
an
 
un-levered
 
basis,
 
the
 
NPV
 
of
 
the
 
project
 
cash
 
flows
represents
 
the Enterpris
 
e
 
Value
 
of the
 
project
 
and amounts
 
to
 
$1.562 billion.
 
The pre-feasibility
financial
 
model
 
prepared
 
for
 
the
 
TRS
 
was
 
developed
 
to
 
test
 
the
 
economic
 
viability
 
of
 
each
 
coal
resource
 
area.
 
The
 
NPV
 
estimate
 
was
 
made
 
for
 
the
 
purpose
 
of
 
confirming
 
the
 
economics
 
for
classification
 
of
 
coal
 
reserves
 
and
 
not
 
for
 
purposes
 
of
 
valuing
 
Coronado
 
or
 
its
 
Buchanan
 
assets.
 
Mine
 
plans
 
were
 
not
 
optimized,
 
and
 
actual
 
results
 
of
 
the
 
operations
 
may
 
be
 
different,
 
but
 
in
 
all
cases, the mine production plan assumes the properties are under competent management.
 
 
ex962p2i0
 
ex962p17i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
9
1.10.2
Sensitivity Analysis
Sensitivity
 
of the
 
NPV
 
results
 
to
 
changes
 
in
 
the
 
key
 
drivers
 
is presented
 
in the
 
chart below.
 
The
sensitivity study shows
 
the NPV at
 
the 10.0% discount rate
 
when Base Case sales
 
prices, operating
costs, and capital costs are increased and decreased in increments
 
of 5% within a +/- 15% range.
Figure 1-4:
 
Sensitivity of NPV
As
 
shown,
 
NPV
 
is
 
quite
 
sensitive
 
to
 
changes
 
in
 
sales
 
price
 
and
 
operating
 
cost
 
estimates,
 
and
slightly sensitive to changes in capital cost estimates.
1.11
Permitting
Coronado
 
has
 
obtained
 
all
 
mining
 
and
 
discharge
 
permits
 
to
 
operate
 
its
 
mine
 
and
 
processing,
loadout,
 
or
 
related
 
support
 
facilities.
 
MM&A
 
is
 
unaware
 
of
 
any
 
obvious
 
or
 
current
 
Coronado
permitting
 
issues
 
that
 
are
 
expected
 
to
 
prevent
 
the
 
issuance
 
of
 
future
 
permits.
 
Buchanan,
 
along
with
 
all
 
coal
 
producers,
 
is
 
subject
 
to
 
a
 
level
 
of
 
uncertainty
 
regarding
 
future
 
clean
 
water
 
permits
due to
United States
 
Environmental Protection
 
Agency
(
EPA
)
 
and
United States Fish
 
and Wildlife
(
USFW
)
 
involvement with state
 
programs.
1.12
Conclusion and Recommendations
Sufficient
 
data
 
have
 
been
 
obtained
 
through
 
various
 
exploration
 
and
 
sampling
 
programs
 
and
mining
 
operations
 
to
 
support
 
the
 
geological
 
interpretations
 
of
 
seam
 
structure
 
and
 
thickness
 
for
coal
 
horizons
 
situated
 
on
 
the
 
Property.
 
The
 
data
 
are
 
of
 
sufficient
 
quantity
 
and
 
reliability
 
to
reasonably support the coal resource and coal reserve estimates in this TRS.
The
 
geological
 
data
 
and
 
preliminary
 
feasibility
 
study,
 
which
 
consider
 
mining
 
plans,
 
revenue,
 
and
operating
 
and
 
capital
 
cost
 
estimates
 
are
 
sufficient
 
to
 
support
 
the
 
classification
 
of
 
coal
 
reserves
provided herein.
 
 
ex962p2i0
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
10
This geologic
 
evaluation conducted
 
in conjunction
 
with the
 
preliminary feasibility
 
study concludes
that
 
the
 
92.9
 
Mt
 
of
 
marketable
 
underground
 
coal
 
reserves
 
identified
 
on
 
the
 
Property
 
are
economically
 
mineable
 
under
 
reasonable
 
expectations
 
of
 
market
 
prices
 
for
 
metallurgical
 
coal
products, estimated operation costs,
 
and capital expenditures.
2
Introduction
2.1
Registrant and Terms
 
of Reference
This report
 
was prepared
 
for
 
the sole
 
use of
Coronado Global
 
Resources
 
Inc. (
Coronado
)
and
 
its
affiliated and
 
subsidiary companies and
 
advisors.
 
An updated TRS
 
was prepared
 
in February 2023
due
 
to
 
material
 
differences
 
in
 
the
 
key
 
financial
 
modifying
 
factors
 
including
 
coal
 
sales
 
price
assumptions,
 
operating
 
costs
 
and
 
capital
 
costs
 
from
 
December
 
31,
 
2021
 
to
 
December
 
31,
 
2022.
 
Coal sales price
 
assumptions are
 
discussed in
 
Sections 12 and
 
16
 
of the TRS,
 
while operating
 
costs
and capital
 
costs are
 
discussed in
Sections 18 and
 
19
 
of the TRS.
 
This report provides
 
a statement
of
 
coal
 
resources
 
and
 
coal
 
reserves
 
for
 
Coronado,
 
as
 
defined
 
under
 
the
Australasian
 
Code
 
for
Reporting
 
of
 
Exploration
 
Results,
 
Mineral
 
Resources
 
and
 
Ore
 
Reserves
(
JORC
 
Code
)
 
as
 
well
 
as
under
 
Subpart
 
1300
 
of
 
Regulation
 
S-K
 
(Regulation
 
S-K
 
1300)
 
promulgated
 
by
 
the
United
 
States
Securities and Exchange
 
Commission (
SEC
)
.
 
This report was
 
also prepared in
 
accordance with the
Australasian
 
Code
 
for
 
Public
 
Reporting
 
of
 
Technical
 
Assessments
 
and
 
Valuations
 
of
 
Mineral
Assets
(
VALMIN Code
).
This
 
report
 
provides
 
a
 
statement
 
of
 
coal
 
resources
 
and
 
coal
 
reserves
 
for
 
Coronado
 
at
 
Buchanan.
 
Exploration results and Resource
 
calculations were used as the basis for the mine planning and the
preliminary feasibility study completed to determine
 
the extent and viability of the reserve.
Coal
 
resources
 
and
 
coal
 
reserves
 
are
 
herein
 
reported
 
in
 
metric
 
units
 
of
 
measurement
 
and
 
are
rounded to millions of metric tonnes (
Mt
).
2.2
Information Sources
This TRS
 
is based on
 
information provided
 
by Coronado
 
and reviewed
 
by MM&A.
 
Sources of data
and information are listed below in
Table 2-1
:
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
11
Table 2-1:
 
Information Provided to MM&A by Coronado
 
Category
Information Provided by Coronado
Report Section
Geological
Geologic data including digital databases
 
and original source data including
geologist logs, driller’s logs, geophysical
 
logs
9.1
Coal Quality
Database of coal quality information
 
supplemented with original source
laboratory sheets where available
10.1
Mining
Historical productivities and manpower
 
from operating and future
 
Coronado
mines
13.2, 13.4
Coal Preparation
Flow sheet and other information representing
 
current and future methods of
coal processing
 
14.1
Waste Disposal
Engineering data and estimates representing
 
remaining capacities for coarse
and fine coal waste disposal
17.2
Costs
Historical and budgetary operating
 
cost information used to derive
 
cost drivers
for reserve financial modeling
18.2
Economic
WACC and inflation rate
 
used in discounted cash flow analysis
19.1, 19.2, 19.3
Note: While the sources of data listed in Table 2-1 are not exhaustive, they represent a significant portion of information which supports this TRS.
 
MM&A reviewed the provided data and found it to be reasonable prior to incorporating it into the TRS.
 
The TRS contains “forward-looking
information” including forecasts of productivity and annual coal production, operating and capital cost estimates, coals sales price forecasts, the
assumption that Coronado will continue to acquire necessary permits, and other assumptions.
 
The TRS statements and conclusions are not a
guarantee of future performance and undue reliance should not be placed on them.
 
The ability of Coronado to recover the estimated coal reserves
is dependent on multiple factors beyond the control of MM&A including, but not limited to geologic factors, mining conditions,
 
regulatory
approvals, and changes in regulations.
 
In all cases, the plans assume the Property is under competent management.
Coronado engaged MM&A to conduct a coal resource and reserve evaluation
 
of the Coronado coal
properties
 
as
 
of
 
September
 
30,
 
2022.
 
Additions
 
and
 
depletion
 
have
 
been
 
used
 
to
 
bring
 
the
Resource
 
and Reserve
 
estimates forward
 
to December
 
31, 2022,
 
the effective
 
date of
 
this TRS
 
for
Buchanan.
 
For the evaluation, the following tasks were
 
to be completed:
 
>
Conduct site visits of the mines and mine infrastructure facilities;
 
>
Process
 
the
 
information
 
supporting
 
the
 
estimation
 
of
 
coal
 
resources
 
and
 
reserves
 
into
geological models;
 
>
Develop life-of-reserve mine
 
(
LOM
) plans and financial models;
>
Hold discussions with Coronado company management; and
 
>
Prepare
 
and
 
issue
 
a
 
TRS
 
providing
 
a
 
statement
 
of
 
coal
 
resources
 
and
 
reserves
 
which
 
would
include:
-
A description of the mine and facilities.
 
-
A description of the evaluation process.
-
An estimation
 
of coal
 
resources and
 
reserves with
 
compliance elements
 
as stated
 
under the
JORC Code and the SEC Regulation S-K 1300.
2.3
Personal Inspections
MM&A
 
is very
 
familiar
 
with
 
Buchanan, having
 
provided
 
a
 
variety
 
of
 
services in
 
recent
 
years,
 
and
the QPs involved in this TRS have
 
conducted multiple site visits.
 
 
ex962p2i0
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
12
3
Property Description
3.1
Location
The
 
Buchanan Mine
 
Complex
 
is located
 
in Buchanan
 
County
 
in southwestern
 
Virginia
 
(see
Figure
1-1
)
 
approximately
 
16
 
kilometers
 
southeast
 
of
 
Grundy,
 
which
 
is
 
the
 
county
 
seat
 
of
 
Buchanan
County.
 
Surface
 
facilities
 
for
 
the
 
shaft
 
mine
 
are
 
located
 
along
 
Garden
 
Creek
 
and
 
a
 
Norfolk
Southern (NS) rail line about 6.4 kilometers south-southeast of Oakwood, Virginia.
The
 
Property
 
is
 
located
 
on
 
the
 
following
United
 
States
 
Geological
 
Survey
 
(
USGS
)
 
Quadrangles:
Prater,
 
Vansant, Keen
 
Mountain, and Jewell Ridge.
 
Current mining projections fall
 
within the Keen
Mountain and Jewell
 
Ridge quadrangles.
 
The coordinate
 
system and datum
 
used for the
 
model of
Buchanan
 
No.
 
1
 
and
 
the
 
subsequent
 
maps
 
were
 
produced
 
in
 
the
 
Virginia
 
State
 
Plane
 
South
system, NAD 27.
 
3.2
Titles, Claims or Leases
The
 
Buchanan
 
coal
 
reserves
 
are
 
located
 
in
 
Buchanan
 
and
 
Tazewell
 
Counties,
 
Virginia.
 
The
Property
 
is
 
composed
 
of
 
approximately
 
33,577
 
total
 
hectares,
 
of
 
which
 
25,852
 
are
 
leased
 
or
subleased
 
from
 
private
 
landholders
 
under
 
approximately
 
150
 
individual
 
coal
 
lease
 
tracts,
 
and
7,725
 
hectares
 
are
 
owned
 
by
 
Coronado.
 
Subject
 
to
 
Coronado’s
 
exercising
 
its
 
renewal
 
rights
thereunder,
 
all the leases
 
expire upon
 
exhaustion of
 
the relevant
 
coal reserves,
 
which is expected
to occur in 2044.
 
MM&A has not carried
 
out a separate
 
title verification for
 
the coal property
 
and
has
 
not
 
verified
 
leases,
 
deeds,
 
surveys,
 
or
 
other
 
property
 
control
 
instruments
 
pertinent
 
to
 
the
subject
 
resources.
 
Tenure
 
was
 
separately
 
reviewed
 
by
 
Coronado’s
 
legal
 
advisors.
 
Coronado
 
has
represented
 
to MM&A
 
that it
 
controls
 
the mining
 
rights to
 
the reserves
 
as shown
 
on its
 
property
maps, and MM&A
 
has accepted these
 
as being a
 
true and accurate
 
depiction of the
 
mineral rights
controlled
 
by
 
Coronado.
 
The
 
TRS
 
assumes
 
the
 
Property
 
is
 
developed
 
under
 
responsible
 
and
experienced management.
3.3
Mineral Rights
Coronado
 
supplied
 
property
 
control
 
maps
 
to
 
MM&A
 
related
 
to
 
properties
 
for
 
which
 
mineral
and/or
 
surface
 
property
 
are
 
controlled
 
by
 
Coronado.
 
While
 
MM&A
 
accepted
 
these
representations
 
as being
 
true and
 
accurate,
 
MM&A has
 
no knowledge
 
of past
 
property boundary
disputes
 
or
 
other
 
concerns,
 
through
 
past
 
knowledge
 
of
 
the
 
Property,
 
that
 
would
 
signal
 
concern
over future mining operations or development potential.
Property control
 
in Appalachia
 
can be
 
intricate.
 
Coal mining
 
properties are
 
typically composed
 
of
numerous property
 
tracts which
 
are owned
 
and/or leased
 
from both
 
land-holding companies
 
and
private
 
individuals
 
or
 
companies.
 
It
 
is
 
common
 
to
 
encounter
 
severed
 
ownership,
 
with
 
different
entities
 
or individuals
 
controlling
 
the
 
surface
 
and mineral
 
rights.
 
Mineral
 
control
 
in the
 
region
 
is
typically
 
characterized
 
by
 
leases
 
or
 
ownership
 
of
 
larger
 
tracts
 
of
 
land,
 
with
 
surface
 
control
generally comprised of smaller tracts, particularly in developed areas.
 
 
ex962p2i0
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
13
Legal
 
mining
 
rights
 
may
 
reflect
 
a
 
combination
 
of
 
fee
 
or
 
mineral
 
ownership
 
and
 
fee
 
or
 
mineral
leases
 
of
 
coal
 
lands
 
through
 
various
 
surface
 
and
 
mineral
 
lease
 
agreements.
 
There
 
is
 
also
 
a
relatively
 
small
 
amount
 
of
 
area
 
where
 
the
 
coal
 
is
 
partially
 
owned
 
and/or
 
partially
 
leased
 
on
 
a
limited number of individual tracts.
 
Control
 
of
 
the
 
surface
 
property
 
is
 
necessary
 
to
 
conduct
 
surface
 
mining
 
but
 
is
 
not
 
necessary
 
to
conduct
 
underground
 
mining.
 
Given that
 
the Buchanan
 
Mine has
 
been active
 
dating back
 
to the
1980s, Coronado,
 
and its predecessors,
 
have a
 
successful history of
 
obtaining any
 
necessary rights
and the associated permits to mine.
3.4
Encumbrances
No
 
Title
 
Encumbrances
 
are
 
known.
 
By
 
assignment,
 
MM&A
 
did
 
not
 
complete
 
an
 
independent
query related to Title Encumbrances.
 
3.5
Other Risks
There
 
is
 
always
 
risk
 
involved
 
in
 
property
 
control.
 
Coronado
 
and
 
its
 
predecessor,
 
CONSOL,
 
have
both
 
had
 
their
 
legal
 
teams
 
examine
 
the
 
deeds
 
and
 
title
 
control
 
in
 
order
 
to
 
minimize
 
the
 
risk.
 
Historically,
 
property control has not posed any challenges related
 
to Buchanan’s operations.
 
4
Accessibility, Climate, Local Resources,
Infrastructure and Physiography
4.1
Topography,
 
Elevation, and Vegetation
The
 
topography
 
of
 
the
 
area
 
surrounding
 
the
 
Buchanan
 
Mine
 
Complex
 
is
 
typical
 
of
 
the
 
Central
Appalachian Plateau being rugged and deeply dissected
 
by v-shaped river valleys
 
flanked by steep-
sided
 
upland
 
regions.
 
Surface
 
elevations
 
near
 
the
 
mine
 
complex
 
range
 
from
 
approximately
 
823
meters
 
above
 
sea
 
level
 
in
 
upland
 
regions
 
to
 
approximately
 
579
 
meters
 
at
 
stream
 
level.
 
The
Property is moderately
 
vegetated, with a mixture
 
of hardwood and conifer forest
 
in the temperate
broadleaf
 
category.
 
The
 
Property
 
is
 
not
 
situated
 
near
 
any
 
major
 
urban
 
centers,
 
and
 
the
surrounding area is considered rural.
4.2
Access and Transport
General
 
access to
 
the Buchanan
 
No. 1
 
Mine property
 
is via
 
a well-developed
 
network of
 
primary,
secondary,
 
and unimproved roads.
 
Highway 460 is the primary highway
 
connecting Pike County in
Eastern
 
Kentucky
 
to
 
Buchanan
 
and
 
Tazewell
 
Counties
 
in
 
Southwestern
 
Virginia.
 
Numerous
secondary
 
and
 
unimproved
 
roads
 
provide
 
direct
 
access
 
to
 
the
 
Property,
 
some
 
being
 
state-
 
and
town-maintained.
 
These roads
 
typically stay
 
open throughout
 
the year.
 
A
Norfolk Southern
 
(
NS
)
rail
 
line
 
that
 
is
 
located
 
approximately
 
6.44
 
kilometers
 
south-southeast
 
of
 
Oakwood,
 
Virginia,
serves
 
as
 
the
 
primary
 
means
 
of
 
transport
 
for
 
produced
 
coal.
 
NS
 
transports
 
coal
 
from
 
the
Buchanan Mine Complex
 
either to domestic
 
customers or to
 
the Pier 6 export
 
terminal at Norfolk,
Virginia
 
for
 
overseas
 
shipment.
 
A
 
small
 
portion
 
of
 
production
 
is
 
transported
 
via
 
truck
 
haul.
 
An
 
 
ex962p2i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
14
extensive
 
network of
 
service roads
 
to gob
 
gas and
 
coalbed methane
 
(
CBM
) production
 
wells exist
on the subject property.
 
4.3
Proximity to Population Centers
The
 
Buchanan
 
No.
 
1
 
Mine
 
property
 
lies
 
near
 
the
 
town
 
of
 
Grundy
 
in
 
Buchanan
 
County,
 
Virginia
approximately
 
290 kilometers
 
southeast of
 
Lexington,
 
Kentucky
 
and 153
 
kilometers
 
southwest
 
of
Roanoke,
 
Virginia.
 
As
 
of
 
2021,
 
Buchanan
 
County
 
had
 
a
 
population
 
of
 
approximately
 
19,800
residents.
 
4.4
Climate and Length of Operating Season
The
 
climate
 
of
 
the
 
region
 
is
 
classified
 
as
 
humid
 
sub-tropical
 
with
 
four
 
distinct
 
seasons:
 
warm
summers,
 
cold
 
winters,
 
and
 
moderate
 
fall
 
and
 
spring
 
seasons.
 
Precipitation
 
in
 
the
 
region
 
is
consistent
 
throughout
 
the
 
year
 
with
 
the
 
most
 
rain
 
falling
 
in
 
spring
 
and
 
the
 
early
 
months
 
of
summer.
 
Average
 
yearly
 
rainfall
 
is
 
112.62
 
centimeters.
 
Summer
 
months
 
typically
 
begin
 
in
 
late
May
 
and
 
end
 
in
 
early
 
September
 
and
 
range
 
in
 
average
 
temperature
 
from
 
49
 
to
 
84
 
degrees
Fahrenheit (or 9.44 to 28.89 degrees Celsius).
 
Winters typically begin in mid to late
 
November and
run until
 
mid to
 
late March
 
with average
 
temperatures
 
ranging from
 
26 to
 
56 degrees
 
Fahrenheit
(or
 
-3.33
 
to
 
13.33
 
degrees
 
Celsius).
 
Precipitation
 
in
 
the
 
winter
 
typically
 
comes
 
in
 
the
 
form
 
of
snowfall
 
or as
 
a wintery
 
mix (sleet
 
and snow)
 
with severe
 
snowfall events
 
occurring occasionally.
 
Seasonal
 
variations
 
in
 
climate
 
typically
 
do
 
not
 
affect
 
underground
 
mining
 
in
 
Virginia.
 
However,
weather
 
events
 
could
 
potentially
 
negatively
 
impact
 
efficiency
 
of
 
surface
 
and
 
preparation
 
plant
operations on a very limited basis and lasting less than a few days.
4.5
Infrastructure
The
 
Buchanan No.
 
1 Mine
 
Complex
 
has
 
sources
 
of water,
 
power,
 
personnel,
 
and
 
supplies readily
available
 
for use.
 
Personnel
 
have historically
 
been sourced
 
from the
 
surrounding communities
 
in
Buchanan, Tazewell,
 
McDowell, and Pike
 
counties, and have
 
proven to
 
be adequate in
 
numbers to
operate
 
the
 
mine.
 
As
 
mining
 
is
 
common
 
in
 
the
 
surrounding
 
areas,
 
the
 
workforce
 
is
 
generally
familiar
 
with
 
mining
 
practices,
 
and
 
many
 
are
 
experienced
 
miners.
 
Water
 
is
 
sourced
 
locally
 
from
streams
 
that
 
flow
 
over
 
Coronado-owned
 
property.
 
The
 
mine
 
also
 
utilizes
 
ground
 
water
 
from
 
an
old
 
abandoned
 
mine.
 
Electricity
 
is
 
sourced
 
from
American
 
Electric
 
Power
 
(
AEP
)
.
 
The
 
service
industry in
 
the areas
 
surrounding the
 
mine complex
 
has historically
 
provided supplies,
 
equipment
repairs
 
and fabrication,
 
etc.
 
The Coronado-owned
 
Buchanan Preparation
 
Plant services
 
the mine
via
 
a
 
skip
 
hoist
 
and
 
conveyor
 
belt
 
system
 
which
 
transports
 
extracted
 
coal
 
from
 
an
 
underground
bunker
 
to
 
the
 
surface
 
facility.
 
The
 
NS
 
rail
 
line
 
serves
 
as
 
the
 
main
 
means
 
of
 
transport
 
from
 
the
mine.
 
 
ex962p2i0
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
15
5
History
5.1
Previous Operation
The
 
Property
 
was
 
formerly
 
controlled
 
by
Consolidation
 
Coal
 
Company
 
(
CONSOL
)
.
 
Mine
development
 
was
 
started
 
by CONSOL
 
in 1983
 
and longwall
 
production
 
began
 
in 1987.
 
Coronado
acquired the Buchanan Mine from CONSOL in March 2016.
The
 
most
 
productive
 
mining
 
of
 
any
 
period
 
since
 
1987
 
has
 
occurred
 
since
 
the
 
acquisition
 
of
Buchanan Mine by Coronado.
 
Production history has been approximately 3.5
 
Mt in 2016 (in only a
9-month period),
 
4.9 Mt
 
in 2017,
 
4.7 Mt
 
in 2018,
 
4.5 Mt
 
in 2019,
 
3.4 Mt
 
in 2020,
 
4.4 Mt
 
in 2021,
and 3.9 Mt in 2022.
5.2
Previous Exploration
The Property has
 
been extensively
 
explored by subsurface
 
drilling efforts carried
 
out by numerous
entities,
 
many
 
of
 
which
 
were
 
completed
 
prior
 
to
 
acquisition
 
by
 
Coronado.
 
The
 
majority
 
of
 
the
drilling was accomplished using vertical continuous (diamond) coring or air rotary methods.
Drill records
 
indicate that
 
independent contract
 
drilling operators
 
have
 
typically been
 
engaged
 
to
carry out drilling on the Property.
 
Geophysical logging on those
 
properties acquired from
 
CONSOL
was
 
often
 
performed
 
by
 
both
 
CONSOL’s
 
in-house
 
logging
 
services
 
and
 
outside
 
logging
 
firms.
 
MM&A, via its Geophysical Logging Systems subsidiary,
 
has logged a significant number of the past
exploration holes and degas wells, and currently logs most
 
of the recently drilled holes.
6
Geological Setting, Mineralization and Deposit
6.1
Regional, Local and Property Geology
The
 
Property
 
lies in
 
the Central
 
Appalachian Coal
 
basin
 
in the
 
Appalachian Plateau
 
physiographic
province.
 
The coal deposits in the eastern
 
US are the oldest and
 
most extensively developed
 
coal deposits in
the
 
country.
 
The
 
coal
 
deposits
 
on
 
the
 
Property
 
are
 
Carboniferous
 
in
 
age,
 
being
 
of
 
the
Pennsylvanian
 
system.
 
Overall,
 
these
 
Carboniferous
 
coals
 
contain
 
two-fifths
 
of
 
the
 
US’s
bituminous
 
coal
 
deposits
 
and
 
extend
 
over
 
1,448
 
kilometers
 
from
 
northern
 
Alabama
 
to
Pennsylvania
 
and
 
are
 
part
 
of
 
what
 
is known
 
as
 
the
Appalachian Basin
.
 
The
 
Appalachian
 
Basin
 
is
more
 
than
 
402
 
kilometers
 
wide
 
and,
 
in
 
some
 
portions,
 
contains
 
over
 
60
 
coal
 
seams
 
of
 
varying
economic significance.
Seams of economic significance
 
typically range between
 
0.30 meters and 1.83
 
meters in thickness,
with relatively
 
little structural
 
deformation.
 
Regional structure
 
is typically characterized
 
by gently
dipping strata to the northwest
 
at less than one percent.
 
 
ex962p2i0 ex962p24i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
16
Seams
 
of
 
the
 
Pocahontas
 
Formation
 
have
 
historically
 
been
 
mined
 
in
 
the
 
Buchanan
 
No.
 
1
 
Mine
with the Pocahontas No. 3 seam being the principal seam in the formation.
 
Coal from the area has
historically been sold in primarily metallurgical market
 
s.
6.2
Mineralization
The generalized stratigraphic
 
columnar section in
Figure 6-1
 
demonstrates the vertical
 
relationship
of the principal coal seams and rock formations on the Property.
Figure 6-1:
 
Buchanan Stratigraphic Column
Note: not to scale
6.3
Deposits
The
 
coal
 
produced
 
at
 
Buchanan No.
 
1
 
is typically
 
Low
 
Volatile
 
(<23%
 
volatile
 
matter)
 
bituminous
coal.
 
Due
 
to
 
the
 
value
 
of
 
the
 
Pocahontas
 
No.
 
3
 
(
P3
)
 
as
 
a
 
low-volatile
 
coking
 
coal,
 
it
 
has
 
been
extensively
 
mined
 
in
 
the
 
region.
 
The
 
P3
 
seam
 
consists
 
of
 
multiple benches
 
that
 
split
 
and
 
merge
across the Property,
 
including in descending stratigraphic order:
 
 
 
ex962p2i0
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
17
>
P31, uppermost bench, represented in purple on
Figures 7-1
 
and
7-2
>
P32, represented in orange on
Figures 7-1
 
and
7-2
>
P33, represented in blue on
Figures 7-1
 
and
7-2
>
345, lowermost bench, represented in green on
Figures 7-1
 
and
7-2
The mineable
 
benches within
 
the P3
 
horizon
 
consist of
 
three principal
 
configurations
 
determined
by variable seam splitting characteristics present across
 
the Property:
 
1.
Full-seam
; all four benches (P31, P32, P33, and 345) are included within the mineable
section. This configuration is present within the remaining North and Northwest
 
resource
areas, as well as the upper portion of the South resource area.
 
Refer to
Figures 7-1
 
and
7-2
below
.
2.
P31, P32, and P33 Benches
; the underlying 345 bench extends more than two feet below
the P33 bench and is no longer included within the mineable section.
 
This configuration is
present on the South side of the Property.
 
Refer to
Figure 7-1
 
below.
3.
P32, P33, and 345 Benches
; the overlying P31 bench extends more than two feet above
 
the
P32 bench and is no longer included within the mineable section.
 
This configuration is
present on the Northeast side of the Property.
 
Refer to
Figure 7-2
 
below.
The
 
full-seam
 
bench
 
(P3)
 
thickness
 
ranges
 
from
 
1.22
 
to
 
3.44
 
meters
 
with
 
an
 
average
 
of
 
1.86
meters,
 
the
 
P31,
 
P32,
 
P33
 
bench
 
thickness
 
ranges
 
from
 
1.22
 
to
 
2.10
 
meters
 
with
 
an
 
average
 
of
1.43
 
meters,
 
and
 
the
 
P32,
 
P33,
 
345
 
bench
 
thickness
 
ranges
 
from
 
1.22
 
to
 
2.71
 
meters
 
with
 
an
average
 
of
 
1.65
 
meters.
 
The
 
seam
 
is
 
situated
 
below
 
drainage
 
throughout
 
the
 
Property
 
and
 
is
accessible by
 
existing mine
 
shafts.
 
Floor and roof
 
strata
 
vary throughout
 
the mine area
 
with floor
strata
 
including fireclay,
 
claystone,
 
shale, sandy
 
shale, and
 
sandstone, but
 
primarily being
 
fireclay
and
 
shale.
 
Roof
 
strata
 
varies
 
throughout
 
as
 
well
 
but
 
primarily
 
is
 
composed
 
of
 
sandstone,
 
sandy
shale, and shale.
 
7
Exploration
7.1
Nature and Extent of Exploration
Extensive
 
exploration
 
in the
 
form
 
of subsurface
 
drill efforts
 
has been
 
carried out
 
on the
 
Property
by numerous entities,
 
most of which efforts
 
were completed
 
prior to the acquisition
 
by Coronado.
 
Diamond core, rotary,
 
and CBM drilling are the three primary types of exploration on the Property.
 
Data
 
for
 
correlation
 
and
 
mining
 
conditions
 
are
 
derived
 
from
 
core
 
descriptions
 
and
 
geophysical
logging (e-logging).
 
Coal quality analyses were also employed
 
during the core exploration
 
process.
 
A
 
total
 
of
 
4,589
 
core,
 
rotary,
 
channel
 
samples,
 
mine
 
measurements,
 
and
 
CBM
 
wells
 
with
Pocahontas
 
No. 3 seam information
 
are found within
 
the Coronado database,
 
of which 1,784 data
points are located within the current
 
mine / resource area.
 
The location of the drilling is shown on
the maps included in
Appendix B
.
 
 
ex962p2i0 ex962p26i1 ex962p26i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
18
The
 
concentration
 
of
 
exploration
 
varies
 
slightly
 
across
 
the
 
Property,
 
with
 
the
 
proposed
underground mining areas
 
having the highest
 
concentration of drill
 
holes.
 
Drilling on the Property
is typically
 
sufficient
 
for
 
delineation
 
of potential
 
underground
 
mineable benches.
 
Core
 
logging is
typically conducted by professional
 
geologists in cases where roof
 
and floor strata are
 
of particular
interest and in cases where greater resolution
 
and geologic detail are needed.
 
However,
 
much
 
of
 
the
 
early
 
drill
 
hole
 
data
 
comes
 
from
 
simplified
 
driller’s
 
logs,
 
which
 
often
 
lack
specific
 
details
 
regarding
 
geotechnical
 
conditions
 
and
 
specific
 
geology,
 
making
 
correlations
 
and
floor
 
and
 
roof
 
conditions
 
difficult
 
to
 
determine.
 
Geophysical
 
logging
 
techniques,
 
by
 
contrast,
document
 
some
 
details
 
useful
 
for
 
geologic
 
interpretation
 
and
 
mining
 
conditions,
 
but
 
do
 
not
provide detailed lithologic
 
information.
 
Given the variability
 
of data-gathering
 
methods, definitive
mapping of future mining
 
conditions may not be
 
possible, but projections and
 
assumptions can be
made within a reasonable degree of certainty.
Once
 
the
 
integrity
 
of
 
the
 
database
 
was
 
established,
 
stratigraphic
 
columnar
 
sections
 
were
generated
 
using
 
cross-sectional
 
analysis
 
to
 
establish
 
or
 
confirm
 
coal
 
seam
 
correlations.
 
Cross-
section illustrating the three
 
mineable bench configurations
 
are presented below
 
in
Figure 7-1
and
Figure 7-2
.
Figure 7-1: Buchanan Cross-Section, A1 – A2
 
 
ex962p2i0 ex962p27i1 ex962p27i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
19
Figure 7-2: Buchanan Cross-Section, B1 – B2
Due
 
to
 
the
 
extended
 
history
 
of
 
exploration
 
by
 
various
 
parties
 
on
 
the
 
Property,
 
a
 
wide
 
variety
 
of
survey techniques
 
exist for
 
documentation of
 
data point
 
locations.
 
Many of
 
the older exploration
drill
 
holes
 
appear
 
to
 
have
 
been
 
located
 
by
 
survey
 
and
 
more
 
recently
 
completed
 
drill
 
holes
 
are
often
 
located
 
by
 
high-resolution
 
Global
 
Positioning
 
System
 
(
GPS
)
 
units.
 
However,
 
some
 
holes
appear to have
 
been approximately
 
located using USGS topography
 
maps or other methods which
are less accurate.
 
Therefore, discretion had
 
to be used regarding the accuracy
 
for the location and
ground surface elevation
 
of some of these older drill holes.
 
In instances where a drill hole location
(or associated
 
coal seam
 
elevations)
 
appeared to
 
be inconsistent
 
with the
 
overall
 
structural
 
trend
(or surface topography
 
for surface-mineable
 
areas), the data
 
point was not
 
honored for
 
geological
modeling.
 
Others with apparently minor variances were adjusted and then used by MM&A.
 
Surveying of the underground and surface mined areas has been performed by the
 
mine operators
and/or
 
their
 
consulting
 
surveyors.
 
By
 
assignment,
 
MM&A
 
did
 
not
 
verify
 
the
 
accuracy
 
or
completeness
 
of
 
supplied
 
mine
 
maps
 
but
 
accepted
 
this
 
information
 
as
 
being
 
the
 
work
 
of
responsible engineers and surveyors.
MM&A
 
compiled
 
comprehensive
 
topographic
 
map
 
files
 
by
 
selecting
 
the
 
best
 
available
 
aerial
mapping for each area and filling any gaps with digital USGS topographic
 
mapping.
7.2
Non-Drilling Procedures and Parameters
To
 
supplement
 
the
 
core
 
hole
 
quality
 
database,
 
samples
 
have
 
been
 
collected
 
from
 
underground
channel samples, mine stockpiles, and/or truck / train shipments.
 
 
ex962p2i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
20
7.3
Drilling Procedures
Core
 
drilling
 
methods
 
typically
 
utilize
 
NX-size
 
(5.4
 
centimeters)
 
or
 
similar-sized
 
core
 
cylinders
 
to
recover core
 
samples, which can be
 
used to delineate
 
geologic characteristics,
 
and for coal
 
quality
testing
 
and geotechnical
 
logging.
 
For the
 
core holes,
 
the geophysical
 
logs are
 
especially useful
 
in
verifying the core recovery
 
of both the coal samples
 
(for assurance that
 
a sample is representative
of
 
the
 
full
 
seam)
 
and
 
of
 
the
 
roof
 
and
 
floor
 
rock
 
samples
 
(for
 
evaluating
 
ground
 
control
characteristics of deep mineable coal seams).
 
In
 
addition
 
to
 
core
 
holes,
 
rotary-drilled
 
holes
 
also
 
exist
 
on
 
much
 
of
 
the
 
Property.
 
Data
 
for
 
the
rotary
 
drilled
 
holes
 
are
 
mainly
 
derived
 
from
 
downhole
 
geophysical
 
logs,
 
which
 
are
 
used
 
to
interpret coal
 
and rock thickness
 
and depth
 
since logging of the
 
drill cuttings
 
is not reliable.
 
From
time to
 
time, geological
 
staff
 
at MM&A
 
have
 
been engaged
 
by Coronado
 
to interpret
 
geophysical
logs
 
within
 
specific
 
areas
 
of
 
interest,
 
the
 
results
 
of
 
which
 
have
 
been
 
added
 
to
 
the
 
Coronado
geologic
 
database.
 
Moreover,
 
MM&A
 
field
 
geologists
 
have
 
conducted
 
gas
 
content
 
(desorption)
testing of core
 
samples as part of an
 
ongoing effort to
 
assess levels of coalbed
 
methane gas (
CBM
)
present
 
within
 
the
 
seam.
 
Additionally,
 
there
 
is
 
an
 
ongoing
 
active
 
surface
 
drilling
 
program
 
for
degassing
 
the
 
mined
 
seam
 
ahead
 
of
 
mining.
 
The
 
degas
 
holes
 
are
 
typically
 
logged
 
geophysically,
and the resulting
 
interpreted data
 
are incorporated
 
into the geological
 
model.
 
Exploratory drilling
generally
 
requires
 
drilling
 
to
 
depths
 
of
 
over
 
305
 
meters
 
to
 
penetrate
 
the
 
target
 
coal
 
seam
 
at
Buchanan.
A wide
 
variety of
 
core
 
logging techniques
 
exist
 
for the
 
Property.
 
For many
 
of the
 
core holes,
 
the
primary
 
data
 
source
 
is
 
a
 
generalized
 
lithology
 
description
 
by
 
the
 
driller,
 
which
 
may
 
be
supplemented by a
 
more detailed core
 
log completed by
 
a geologist.
 
These logs were provided
 
to
MM&A
 
as
 
a
 
geological
 
database.
 
MM&A
 
geologists
 
were
 
not
 
involved
 
in
 
the
 
production
 
of
original
 
core
 
logs
 
but
 
did
 
perform
 
a
 
basic
 
check
 
of
 
information
 
within
 
the
 
provided
 
database.
 
Where geophysical
 
logs for such holes
 
are available, they
 
were used by MM&A
 
geologists to verify
the coal thickness and core recovery of seams.
 
7.4
Hydrology
Buchanan
 
is
 
an
 
active
 
mine
 
with
 
no
 
hydrologic
 
concerns
 
or
 
material
 
issues
 
experienced
 
in
 
its
history.
 
Future mining
 
is projected
 
to occur
 
in areas
 
exhibiting similar
 
hydrogeological
 
conditions
as
 
past
 
mining,
 
including
 
stream
 
undermining,
 
undermining
 
of
 
aquifers,
 
and
 
mining
 
through
hydraulically
 
fractured
 
(frac’d)
 
coalbed
 
methane
 
wells.
 
Based
 
upon
 
the
 
successful
 
history
 
of the
operation with
 
regards to
 
hydrogeological
 
conditions, MM&A
 
assumes that
 
the operation
 
will not
be hindered by such issues in the future.
7.5
Geotechnical Data
Mining
 
plans
 
for
 
potential
 
underground
 
mines
 
were
 
developed
 
by
 
Coronado
 
and
 
modified
 
by
MM&A to
 
fit current
 
property constraints.
 
Pillar stability
 
was tested
 
by MM&A
 
using the
Analysis
of Retreat
 
Mining Pillar Stability
 
(ARMPS
) and
Analysis of Longwall
 
Pillar Stability
 
(ALPS)
 
programs
that
 
were
 
developed
 
by
 
the
National
 
Institute
 
for
 
Occupational
 
Safety
 
and
 
Health
 
(
NIOSH
)
.
 
MM&A
 
reviewed
 
the
 
results
 
from
 
the
 
ARMPS
 
and
 
ALPS
 
analysis
 
and
 
considered
 
them
 
in
 
the
development of the LOM plan.
 
 
ex962p2i0
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
21
8
Sample Preparation, Analyses and Security
8.1
Prior to Sending to the Lab
Most
 
of the
 
coal
 
samples have
 
been obtained
 
from
 
the Property
 
by subsurface
 
exploration
 
using
core drilling
 
techniques.
 
The protocol
 
for preparing
 
and testing
 
the samples
 
has varied
 
over time
and
 
is
 
not
 
well
 
documented
 
for
 
the
 
older
 
holes
 
drilled
 
on
 
the
 
Property.
 
Typical
 
core-drilling
sampling
 
methods
 
for
 
coal
 
in
 
the
 
United
 
States
 
involves
 
drilling
 
through
 
the
 
seam, removing
 
the
core
 
from the
 
barrel, describing
 
the lithology,
 
wrapping
 
the sample
 
in a
 
sealed plastic
 
sleeve
 
and
placing it lengthwise
 
into a covered
 
core box, and
 
carefully marking hole
 
ID and depth intervals
 
on
each box
 
and
 
lid, allowing
 
the
 
core
 
to
 
be delivered
 
to
 
a laboratory
 
in correct
 
stratigraphic
 
order,
and
 
with
 
original
 
moisture
 
content.
 
This
 
process
 
has
 
been
 
the
 
norm
 
for
 
both
 
historical
 
and
ongoing exploration activities at the Property.
This
 
work
 
is
 
typically
 
performed
 
by
 
the
 
supervising
 
driller,
 
geologist,
 
or
 
company
 
personnel.
 
Samples
 
are
 
most
 
often
 
delivered
 
to
 
the
 
company
 
by
 
the
 
driller
 
after
 
each
 
shift
 
or
 
acquired
 
by
company personnel
 
or representatives.
 
Most of the
 
coal core
 
samples were obtained
 
by previous
or current
 
operators
 
on the
 
Property.
 
MM&A did
 
not participate
 
in the
 
collection, sampling,
 
and
analysis of the core samples.
 
However,
 
it is reasonable to assume, given the consistency
 
of quality
from
 
previous
 
operators,
 
that
 
these
 
samples
 
were
 
generally
 
collected
 
and
 
processed
 
under
industry
 
best
 
practices.
 
This
 
assumption
 
is
 
based
 
on
 
MM&A’s
 
familiarity
 
with
 
the
 
operating
companies and the companies used to perform the analyses.
8.2
Lab Procedures
Coal-quality testing
 
has been
 
performed over
 
many years
 
by operating
 
companies using
 
different
laboratories
 
and testing
 
regimens.
 
Some of
 
the samples
 
have
 
raw
 
analyses
 
and
 
washabilities
 
on
the
 
full
 
seam
 
(with
 
coal
 
and
 
rock
 
parting
 
layers
 
co-mingled)
 
and
 
are
 
mainly
 
useful
 
for
characterizing the
 
coal quality for
 
projected production
 
from underground
 
mining.
 
Other samples
have
 
coal
 
and
 
rock
 
analyzed
 
separately,
 
the
 
results
 
of
 
which
 
can
 
be
 
utilized
 
to
 
forecast
underground
 
mining
 
quality.
 
Care
 
has
 
been
 
taken
 
to
 
use
 
only
 
those
 
analyses
 
that
 
are
representative
 
of
 
the
 
coal
 
quality
 
parameters
 
for
 
the
 
appropriate
 
mining
 
type
 
for
 
each
 
sample.
 
Unlike
 
many
 
Appalachian properties,
 
Buchanan has
 
interest
 
in
 
a
 
single deep-mineable
 
seam,
 
the
Pocahontas
 
No.
 
3
 
seam;
 
therefore,
 
the
 
analyses
 
have
 
been
 
conducted
 
following
 
a
 
consistent
protocol.
Standard procedure
 
upon receipt
 
of core
 
samples by
 
the testing
 
laboratory is
 
to: 1)
 
log the
 
depth
and
 
thickness
 
of
 
the
 
sample;
 
then
 
2)
 
perform
 
testing
 
as
 
specified
 
by
 
a
 
representative
 
of
 
the
operating company.
 
Samples
 
are
 
analyzed
 
in
 
accordance
 
with
 
procedures
 
defined
 
under
ASTM
 
International
 
(
ASTM
)
standards
 
including,
 
but
 
not
 
limited
 
to
 
(not
 
all
 
analytical
 
tests
 
identified
 
in
 
the
 
list
 
below
 
have
been
 
run
 
on
 
each
 
sample):
 
washability
 
(ASTM
 
D4371);
 
ash
 
(ASTM
 
D3174);
 
sulfur
 
(ASTM
 
D4239);
Btu/lb. (ASTM D5865); volatile matter (ASTM D3175); Free Swell
 
Index (
FSI
) (ASTM D720).
 
 
 
ex962p2i0
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
22
While
 
not
 
confirmed
 
by
 
MM&A,
 
it
 
is
 
assumed
 
that
 
best
 
practices
 
and
 
ASTM
 
(or
 
equivalent
standards at the time of testing) were utilized
 
in laboratory quality testing.
9
Data Verification
9.1
Procedures of Qualified Person
MM&A
 
reviewed
 
the
 
digital
 
geologic
 
database
 
supplied
 
by
 
Coronado.
 
The
 
database
 
consists
 
of
data
 
records,
 
which
 
include
 
drill
 
hole
 
information
 
for
 
holes
 
that
 
lie
 
within
 
and
 
adjacent
 
to
 
the
Property
 
and
 
records
 
for
 
numerous
 
supplemental
 
coal
 
seam
 
thickness
 
measurements.
 
Upon
completion
 
of the
 
database
 
verification,
 
copies of
 
each entry
 
were
 
printed,
 
and cross
 
referenced
to
 
the
 
original
 
document
 
for
 
verification.
 
Once
 
the
 
initial
 
integrity
 
of
 
the
 
database
 
was
established,
 
stratigraphic
 
columnar
 
sections
 
were
 
generated
 
using
 
cross-sectional
 
analysis
 
to
establish
 
or
 
confirm
 
coal-seam
 
correlations.
 
Geophysical
 
logs
 
were
 
used
 
wherever
 
available
 
to
assist in
 
confirming the
 
seam correlation
 
and to
 
verify proper
 
seam thickness
 
measurements
 
and
recovery of coal samples.
 
After
 
establishing
 
and/or
 
verifying
 
proper
 
seam
 
correlation,
 
seam
 
data-control
 
maps
 
and
geological
 
cross-sections
 
were
 
generated
 
and
 
again
 
used
 
to
 
verify
 
seam
 
correlations
 
and
 
data
integrity.
 
Once
 
the
 
database
 
was
 
fully
 
vetted,
 
seam
 
thickness, base-of-seam
 
elevation,
 
roof
 
and
floor lithology,
 
and overburden
 
maps were
 
independently generated
 
for use
 
in the
 
mine planning
process.
9.2
Limitations
As
 
with
 
any
 
exploration
 
program,
 
localized
 
anomalies
 
cannot
 
always
 
be
 
discovered.
 
The
 
greater
the density
 
of the
 
samples taken,
 
the less
 
the risk.
 
Once an
 
area is
 
identified as
 
being of
 
interest
for inclusion in the mine plan, additional samples are taken to
 
help reduce the risk in those specific
areas.
 
In
 
general,
 
provision
 
is
 
made
 
in
 
the
 
mine
 
planning
 
portion
 
of
 
the
 
study
 
to
 
allow
 
for
localized
 
anomalies
 
that
 
are
 
typically
 
classed
 
more
 
as
 
a
 
nuisance
 
than
 
a
 
hinderance.
 
Longwall
production has been de-rated in thinner coal zones.
9.3
Opinion of Qualified Person
Sufficient
 
data
 
have
 
been
 
obtained
 
through
 
various
 
exploration
 
and
 
sampling
 
programs
 
and
mining
 
operations
 
to
 
support
 
the
 
geological
 
interpretations
 
of
 
seam
 
structure
 
and
 
thickness
 
for
coal
 
horizons
 
situated
 
on
 
the
 
Property.
 
The
 
data
 
are
 
of
 
sufficient
 
quantity
 
and
 
reliability
 
to
reasonably support the coal resource and coal reserve estimates in this TRS.
10
Mineral Processing and Metallurgical Testing
10.1
Testing
 
Procedures
Separate
 
tabulations
 
have
 
been
 
compiled
 
for
 
basic
 
chemical
 
analyses
 
(both
 
raw
 
and
 
washed
quality),
 
petrographic
 
data,
 
rheological
 
data
 
and
 
chlorine,
 
ash,
 
ultimate
 
and
 
sulfur
 
analysis.
 
The
 
 
ex962p2i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
23
latter two data types
 
are not as prevalent and have
 
been supplemented by samples collected from
mine stockpiles and either truck- or train-shipment samples.
Available
 
coal-quality data
 
were
 
tabulated
 
by resource
 
area in
 
a Microsoft®
 
EXCEL
 
workbook and
the
 
details
 
of
 
that
 
work
 
are
 
maintained
 
on
 
file
 
at
 
the
 
offices
 
of
 
Coronado
 
and
 
MM&A.
 
These
tables also
 
provide basic
 
statistical
 
analyses of
 
the coal
 
quality data
 
sets, including
 
average
 
value;
maximum
 
and
 
minimum
 
values;
 
and
 
the
 
number
 
of
 
samples
 
available
 
to
 
represent
 
each
 
quality
parameter
 
of
 
the
 
seam.
 
Coal
 
samples
 
that
 
were
 
deemed
 
by
 
MM&A
 
geologists
 
to
 
be
unrepresentative
 
were
 
not
 
used
 
for
 
statistical
 
analysis
 
of
 
coal
 
quality,
 
as
 
documented
 
in
 
the
tabulations.
 
A
 
representative
 
group
 
of
 
drill
 
hole
 
samples
 
from
 
the
 
Property
 
were
 
then
 
checked
against the original drill laboratory reports to verify
 
accuracy and correctness.
The
 
amount
 
and
 
areal
 
extent
 
of
 
coal
 
sampling
 
for
 
geological
 
data
 
is
 
generally
 
sufficient
 
to
represent
 
the quality
 
characteristics
 
of the
 
coal
 
horizons
 
and
 
allow for
 
proper
 
market
 
placement
of the
 
subject
 
coal
 
seams.
 
For
 
some of
 
the
 
coal deposits
 
there
 
are
 
considerable
 
laboratory
 
data
from
 
core
 
samples that
 
are
 
representative
 
of the
 
full
 
extent
 
of the
 
resource
 
area;
 
and for
 
others
there are
 
more limited data
 
to represent
 
the resource area.
 
For example, in
 
the active operations
with
 
considerable
 
previous
 
mining,
 
there
 
may
 
be
 
limited
 
quality
 
data
 
within
 
some
 
of
 
the
remaining
 
resource
 
areas;
 
however,
 
in those
 
cases
 
the
 
core
 
sampling
 
data
 
can
 
be supplemented
with
 
operational
 
data
 
from
 
mining
 
and
 
shipped
 
quality
 
samples
 
representative
 
of
 
the
 
resource
area.
10.2
Relationship of Tests
 
to the Whole
The extensive
 
sampling and
 
testing procedures
 
typically followed
 
in the
 
coal
 
industry result
 
in an
excellent
 
correlation
 
between
 
samples
 
and
 
marketable
 
product.
 
Shipped
 
analyses
 
of
 
the
 
coal
from Buchanan were
 
reviewed to verify
 
that the coal quality
 
and characteristics were
 
as expected.
 
Buchanan
 
has
 
a
 
long
 
history
 
of
 
saleable
 
production
 
in
 
the
 
low-volatile
 
metallurgical
 
markets,
confirming
 
exploration
 
results.
 
Degradation
 
of
 
coking
 
coal
 
characteristics
 
over
 
time
 
is
 
not
anticipated to be an issue.
10.3
Lab Information
As
 
noted
 
previously,
 
samples
 
are
 
analyzed
 
at
 
area
 
Laboratories
 
that
 
operate
 
in
 
accordance
 
with
procedures
 
defined under
 
ASTM standards
 
including, but
 
not limited
 
to the
 
following
 
(Note:
 
not
all analytical tests identified in this list have been run on each sample.):
>
ASTM D 4371
 
– Test
 
Method for Determining Washability Characteristics
 
of Coal
>
ASTM D 3174
 
– Method for Ash in the Analysis Sample of Coal and Coke
>
ASTM D
 
4239
 
– Test
 
Methods for
 
Sulphur in
 
the Analysis
 
Sample of
 
Coal and
 
Coke
 
Using High-
Temperature
 
Tube Furnace Combustion Methods
>
ASTM D 5865
 
– Test
 
Method for Gross Calorific Value
 
of Coal and Coke
>
ASTM D 3175
 
– Test
 
Method for Volatile Matter
 
in the Analysis Sample of Coal and Coke
>
ASTM D 3176
– Standard Practice for Ultimate Analysis of Coal and Coke
 
 
ex962p2i0
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
24
>
ASTM D 3178
- Test
 
Method for Carbon and Hydrogen in Coal and Coke
>
ASTM D 3179
-
Te
st Method for Nitrogen in Coal and Coke
>
ASTM D 720
 
– Test
 
Method for Free-Swelling Index (
FSI
) of Coal
>
ASTM
 
D
 
5515
-
 
Test
 
Method
 
for
 
Determination
 
of
 
the
 
Swelling
 
Properties
 
of
 
Bituminous
 
Coal
Using a Dilatometer (Arnu)
>
ASTM D 2639
 
– Test
 
Method for Plastic Properties of Coal (Gieseler)
>
ASTM D 3683
– Trace Elements
 
in Coal and Coke Ash by the Atomic Absorption Method
>
ASTM D 1857
– Standard Test
 
Method for Fusibility of Coal and Coke Ash
>
ASTM
 
D
 
2798
–
 
Microscopical
 
Determination
 
of
 
the
 
Reflectance
 
of
 
Vitrinite
 
in
 
a
 
Polished
Specimen of Coal
Ultimate
 
analysis
 
is
 
a
 
process
 
typically
 
used
 
which
 
gives
 
the
 
composition
 
of
 
coal
 
in
 
terms
 
of
carbon,
 
hydrogen,
 
nitrogen,
 
oxygen,
 
ash,
 
and
 
sulfur
 
without
 
regard
 
to
 
origin.
 
The
 
sum
 
of
 
the
carbon,
 
hydrogen,
 
nitrogen,
 
sulfur,
 
and ash
 
are subtracted
 
from
 
100
 
percent
 
to
 
calculate
 
oxygen
percent.
Heating
 
value or
 
calorific value
 
is a
 
measure of
 
the heat
 
produced
 
from a
 
unit weight
 
of coal.
 
In
the
 
United
 
States,
 
it
 
is
 
commonly
 
expressed
 
in
 
British
 
thermal
 
units
 
per
 
pound
 
(
Btu/lb.
).
 
Other
units
 
are
 
kilocalories
 
per
 
kilogram
 
(
Kcal/kg
)
 
and
 
kilojoules
 
per
 
gram
 
(
KJ/g
).
 
Heating
 
value
 
is
generally determined by burning a weighed coal sample, in oxygen,
 
in a calorimeter.
10.4
Relevant Results
No critical factors have been found
 
that would adversely affect the recovery
 
of the Reserve.
 
11
Mineral Resource Estimates
MM&A
 
independently
 
created
 
a
 
geologic
 
model
 
to
 
define
 
the
 
coal
 
resources
 
at
 
Buchanan.
 
Coal
resources were estimated
 
as of December 31, 2022.
11.1
Assumptions, Parameters and Methodology
Geological
 
data
 
were
 
imported
 
into
 
Carlson
 
Mining
®
 
(formerly
 
SurvCADD
®
)
 
geological
 
modelling
software
 
in
 
the
 
form
 
of Microsoft
®
 
Excel
 
files
 
incorporating
 
drill
 
hole
 
collars,
 
seam
 
and
 
thickness
picks, bottom
 
seam elevations
 
and raw
 
and washed
 
coal quality.
 
These data
 
files were
 
validated
prior to importing into the software.
 
Once imported, a geologic model was created, reviewed, and
verified with a key element being a gridded model of coal seam thickness.
 
Resource
 
tonnes
 
were
 
estimated
 
by
 
using
 
the
 
seam
 
thickness
 
grid
 
based
 
on
 
each
 
valid
 
point
 
of
observation and
 
by defining
 
resource confidence
 
arcs around
 
the points
 
of observation.
 
Points of
observation for
 
Measured and
 
Indicated confidence
 
arcs were
 
defined for
 
all valid
 
drill holes
 
that
intersected
 
the seam
 
using standards
 
deemed acceptable
 
by MM&A
 
based on
 
a detailed
 
geologic
evaluation and a statistical analysis
 
of all drill holes within the projected reserve areas as described
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
25
in
Section 11.1.1
.
 
The geological
 
evaluation incorporated
 
an analysis
 
of seam
 
thickness related
 
to
depositional environments, adjacent roof and floor lithologies, and structural influences.
After
 
validating
 
coal
 
seam
 
data
 
and
 
establishing
 
correlations,
 
the
 
thickness
 
and
 
elevation
 
for
seams
 
of
 
economic
 
interest
 
were
 
used
 
to
 
generate
 
a
 
geologic
 
model.
 
Due
 
to
 
the
 
relative
structural
 
simplicity
 
of
 
the
 
deposits
 
and
 
the
 
reasonable
 
continuity
 
of
 
the
 
tabular
 
coal
 
beds,
 
the
principal
 
geological
 
interpretation
 
necessary
 
to
 
define
 
the
 
geometry
 
of
 
the
 
coal
 
deposits
 
is
 
the
proper
 
modeling
 
of
 
their
 
thickness
 
and
 
elevation.
 
Both
 
coal
 
thickness
 
and
 
quality
 
data
 
are
deemed
 
by
 
MM&A
 
to
 
be
 
reasonably
 
sufficient
 
within
 
the
 
resource
 
areas.
 
Therefore,
 
there
 
is
 
a
reasonable
 
level
 
of
 
confidence
 
in
 
the
 
geologic
 
interpretations
 
required
 
for
 
coal
 
resource
determination based on the available data and the techniques applied to the data.
Table
 
11-1
 
below
 
provides
 
the
 
geological
 
mapping
 
and
 
coal
 
tonnage
 
estimation
 
criteria
 
used
 
for
the
 
coal
 
resource
 
and
 
reserve
 
evaluation.
 
These
 
cut-off
 
parameters
 
have
 
been
 
developed
 
by
MM&A based
 
on its
 
experience with
 
the Coronado
 
property
 
and are
 
typical of
 
mining operations
in
 
the
 
Central
 
Appalachian
 
coal
 
basin.
 
This
 
experience
 
includes
 
technical
 
and
 
economic
evaluations
 
of
 
numerous
 
properties
 
in the
 
region
 
for
 
the
 
purposes
 
of
 
determining
 
the
 
economic
viability of the subject coal reserves.
Table 11-1:
 
General Reserve and Resource Criteria
Item
Parameters
Technical Notes & Exceptions*
•
 
General Reserve Criteria
 
 
Reserve Classification
Reserve and Resource
Reliability Categories
Reserve (Proven and Probable)
Resource (Measured, Indicated and Inferred)
To better reflect geological conditions of the coal
deposits, distance between points of observation is
standard USGS (in meters), respectively, for measured
and indicated and inferred.
Effective Date of Resource Estimate
December 31, 2022
Coal resources were updated for depletion based on
information from Coronado.
 
Effective date for coal
resources is as of December 31, 2022.
Effective Date of Reserve Estimate
December 31, 2022
Coal reserves were updated for depletion based on
information from Coronado.
 
Effective date for coal
reserves is as of December 31, 2022.
Seam Density
Variable, dependent upon seam characteristics
(based on available drill hole quality).
 
In the
absence of laboratory data, estimated by (1)
assuming specific gravity of 1.30 for coal and 2.25
to 2.5 for rock parting, or (2) 1280 kg/m
3
 
to 1324
kg/m
3
 
for a "clean" seam
•
 
Underground-Mineable Criteria
Map Thickness
Total seam thickness
Minimum Seam Thickness
1.2 meters (locally <1.2 m for limited areas
integral to the mine plan)
Minimum Mining Thickness
1.83 meters
Minimum In-Seam Wash Recovery
40 percent
 
Wash Recovery Applied to Coal
Reserves
Based on average yield for drill holes within
reserve area, or in the absence of laboratory
washability data, based on estimated visual
recovery using specific gravities noted above and
95 percent yield on "clean" coal
Out-of-Seam Dilution Thickness for
Run-of-Mine Tonnes Applied to Coal
Reserves
0.05 meters
2243 kg/m³ density used for dilution tonnage estimate
Mine Barrier
61-meter distance from abandoned mines and
sealed or pillared areas.
Adjustments Applied to Coal Reserves
6 percent moisture increase; 5 percent
preparation plant inefficiency
Note:
 
Exceptions for
 
application of
 
these criteria
 
to resource
 
and reserve
 
estimation are
 
made as
 
warranted and
 
demonstrated by
 
either actual
 
mining
experience or detailed data
 
that allows for empirical
 
evaluation of mining conditions.
 
Final classification of coal reserve
 
is made based on the
 
pre-
feasibility evaluation.
 
 
ex962p2i0
 
ex962p34i1 ex962p34i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
26
11.1.1
Geostatistical Analysis for Classification
MM&A
 
completed
 
a
 
geostatistical
 
analysis
 
on
 
drill
 
holes
 
within
 
the
 
reserve
 
boundaries
 
to
determine
 
the
 
applicability
 
of the
 
common
 
United
 
States
 
classification
 
system
 
for
 
measured
 
and
indicated and inferred
 
coal resources.
 
Historically,
 
the United States
 
has assumed that coal
 
within
0.4
 
kilometers
 
of
 
a
 
point
 
of
 
observation
 
represents
 
a
 
measured
 
resource
 
whereas
 
coal
 
between
0.4
 
kilometer
 
and
 
1.2
 
kilometers
 
from
 
a
 
point
 
of
 
observation
 
is
 
classified
 
as
 
indicated.
 
Inferred
resources are commonly assumed
 
to be located between
 
1.2 kilometers and 4.8
 
kilometers from a
point
 
of
 
observation.
 
Per
 
SEC
 
regulations,
 
only
 
measured
 
and
 
indicated
 
resources
 
may
 
be
considered for reserve classification, respectively
 
as proven and probable reserves.
MM&A
 
performed
 
a
 
geostatistical
 
analysis
 
of
 
the
 
Buchanan data
 
set
 
using the
 
Drill
 
Hole
 
Spacing
Analysis
 
(
DHSA
)
 
method.
 
This
 
method
 
attempts
 
to
 
quantify
 
the
 
uncertainty
 
of
 
applying
 
a
measurement
 
from
 
a
 
central
 
location
 
to
 
increasingly
 
larger
 
square
 
blocks
 
and
 
provides
recommendations
 
for determining
 
the distances
 
between drill
 
holes for
 
measured, indicated,
 
and
inferred resources.
To
 
perform DHSA the data
 
set was processed to remove
 
any erroneous data points,
 
clustered data
points, as
 
well as
 
directional trends.
 
This was
 
achieved through
 
the use
 
of histograms,
 
as seen
 
in
Figure 11-1
, color coded scatter
 
plots showing the geospatial positioning
 
of the borings,
Figure 11-
2
, and trend analysis.
Figure 11-1:
 
Histogram of the Total
 
Seam
Thickness for the Pocahontas No. 3 Seam Present
in the Buchanan Mine Complex
Figure 11-2:
 
Scatter plot of the Total
 
Seam
Thickness for the Pocahontas No. 3 Seam Present in
the Buchanan Mine Complex
Following the completion of
 
data processing, a variogram
 
of the data set was
 
created,
Figure 11-3
.
 
The
 
variogram
 
plots average
 
square difference
 
against
 
the separation
 
distance
 
between
 
the data
pairs.
 
The
 
separation
 
distance
 
is broken
 
up into
 
separate
 
bins defined
 
by a
 
uniform
 
lag distance
(e.g., for
 
a lag
 
distance of
 
152 meters
 
the bins
 
would be
 
0 –
 
152 meters,
 
153 –
 
305 meters,
 
etc.).
 
Each
 
pair of
 
data
 
points that
 
are
 
less than
 
one lag
 
distance
 
apart are
 
reported
 
in the
 
first
 
bin.
 
If
the data
 
pair is further
 
apart than one
 
lag distance
 
but less than
 
two lag distances
 
apart, then the
variance
 
is reported
 
in the
 
second
 
bin.
 
The
 
numerical
 
average
 
for
 
differences
 
reported
 
for
 
each
bin is then plotted on the
 
variogram.
 
Care was taken
 
to define the lag distance
 
in such a way as to
not
 
overestimate
 
any
 
nugget
 
effect
 
present
 
in
 
the
 
data
 
set.
 
Lastly,
 
modeled
 
equations,
 
often
 
 
ex962p2i0 ex962p35i0
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
27
spherical, gaussian, or
 
exponential, are applied to
 
the variogram in order
 
to represent the
 
data set
across a continuous spectrum.
Figure 11-3: Variogram of the Total
 
Seam Thickness for the Pocahontas No. 3 Seam
 
Present in the Buchanan Mine Complex
The estimation
 
variance is
 
then calculated
 
using information
 
from the
 
modeled variogram
 
as well
as
 
charts
 
published
 
by
 
Journel
 
and
 
Huijbregts
 
(1978).
 
This
 
value
 
estimates
 
the
 
variance
 
from
applying
 
a
 
single
 
central
 
measurement
 
to
 
increasingly
 
larger
 
square
 
blocks.
 
Care
 
was
 
taken
 
to
ensure
 
any
 
nugget
 
effect
 
present
 
was
 
added
 
back
 
into
 
the
 
data.
 
This
 
process
 
was
 
repeated
 
for
each test block size.
The
 
final
 
step
 
of
 
the
 
process
 
is
 
to
 
calculate
 
the
 
global
 
estimation
 
variance.
 
In
 
this
 
step,
 
the
number of square blocks that
 
would fit inside the selected
 
study area is determined for
 
each block
size
 
that
 
was
 
investigated
 
in
 
the
 
previous
 
step.
 
The
 
estimation
 
variance
 
is
 
then
 
divided
 
by
 
the
number
 
of
 
blocks
 
that
 
would
 
fit
 
inside
 
the
 
study
 
area
 
for
 
each
 
test
 
block
 
size.
 
Following
 
this
determination,
 
the
 
data
 
is
 
then
 
transformed
 
back
 
to
 
represent
 
the
 
relative
 
error
 
in
 
the
 
95th-
percentile range.
Figure 11-4
shows the
 
results of
 
the DHSA
 
performed on
 
the Pocahontas
 
No. 3
 
seam data
 
for the
Buchanan Mine.
 
DHSA provides hole to hole
 
spacing values; these distances need to
 
be converted
to radius
 
from a
 
central point
 
in order
 
to compare
 
to the
 
historical
 
standards.
 
A summary
 
of the
radius
 
data
 
is shown
 
in
Table
 
11-2
.
 
DHSA
 
prescribes
 
that
 
measured,
 
indicated,
 
and inferred
 
drill
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex962p36i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
28
hole spacing be
 
determined at
 
the 10-percent,
 
20-percent, and
 
50-percent levels
 
of relative
 
error,
respectively.
Figure 11-4: Result of DHSA for the Pocahontas No. 3 Seam Present in the Buchanan Mine Complex
Table 11-2:
 
DHSA Results Summary for Radius from a Central Point
Model:
Measured Radial Distance
(10% Relative Error)
Indicated Radial Distance
(20% Relative Error)
Inferred Radial Distance
(50% Relative Error)
(km)
(km)
(km)
Gaussian:
0.71
1.10
2.76
Spherical:
0.71
1.08
2.67
Exponential:
0.67
1.08
3.08
Comparing
 
the
 
results
 
of
 
the
 
DHSA
 
to
 
the
 
historical
 
standards,
 
it
 
is
 
evident
 
that
 
the
 
historical
standards
 
are
 
more
 
conservative
 
than
 
even
 
the
 
most
 
conservative
 
DHSA
 
model
 
with
 
regards
 
to
determining
 
measured
 
resources.
 
The
 
Exponential
 
model
 
recommends
 
using
 
a
 
radius
 
of
 
0.67
kilometers
 
for
 
measured
 
resources
 
compared
 
to
 
the
 
historical
 
value
 
of
 
0.4
 
kilometers.
 
With
respect
 
to
 
indicated
 
resources,
 
the
 
DHSA
 
falls
 
in
 
line
 
closely
 
with
 
the
 
historical
 
standards.
 
The
Exponential
 
and Spherical
 
models recommend
 
using a
 
radius
 
1.08 kilometers,
 
while the
 
Gaussian
model
 
recommends
 
a
 
radius
 
of
 
1.10
 
kilometers.
 
These
 
values
 
line
 
up
 
closely
 
with
 
the
 
historical
radius of 1.2
 
kilometers.
 
These results have
 
led the QPs
 
to report the
 
data following
 
the historical
classification standards, rather
 
than use the results of the DHSA.
11.2
Qualified Person’s Estimates
Mineral
 
resources,
 
representing
 
in-situ
 
coal
 
from
 
a
 
portion
 
of
 
which
 
reserves
 
are
 
derived,
 
are
presented below.
 
Based on the work described and detailed modelling of the areas
 
considering all
the parameters
 
defined, a
 
coal resource
 
estimate,
 
summarized
 
in
Table
 
11-3
, was
 
prepared
 
as of
December 31, 2022, for property controlled by Coronado.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
29
Table 11-3:
 
Coal Resources Summary as of December 31, 2022
 
Coal Resource (Dry Tonnes, In Situ, Mt)
Resource Quality (Dry)
Area
Measured
Indicated
Inferred
Total
Ash%
Sulfur%
VM%
Inclusive of Reserves
158.0
10.2
0.0
168.2
25
0.7
16
Exclusive of Reserves
33.9
5.9
0.0
39.8
Total 12/31/2022
191.9
16.1
0.0
208.0
 
Note:
 
Resource tonnes are inclusive of reserve tonnes since they include the in-situ tonnes from which recoverable coal reserves are derived.
Note 2:
 
Coal resources are reported on a dry basis.
 
Surface moisture and inherent moisture are excluded.
Note 3: The Property contains 39.8 Mt of dry, in-place measured and indicated coal resources exclusive of reserves as of December 31, 2022.
11.3
Resources Exclusive of Reserves
The
 
Property
 
contains
 
multiple
 
resource
 
blocks
 
which
 
were
 
not
 
deemed
 
to
 
exhibit
 
reserve
potential
 
at the
 
time of
 
the
 
study.
 
These
 
resources,
 
formally
 
identified as
 
resources
 
exclusive
 
of
reserves,
 
are located
 
in the
 
Pocahontas
 
No. 3
 
coal seam.
 
Reasons which
 
may preclude
 
elevation
of resources to reserves include, but are not limited to:
1.
Insufficient density of drilling and/or coal quality data available
 
at the time of this evaluation.
2.
Unfavorable economics
 
at the PFS level, yet economics could become attractive
 
in the future
under different market
 
conditions.
 
3.
Exclusion from LOM planning by mining operator
 
due to remaining resource blocks which are
relatively small, isolated blocks and not currently attractive
 
from an operational perspective.
 
Multiple resource blocks in the active Buchanan Mine have not been considered
 
as reserve
due to relatively small size and isolation.
11.3.1
Initial Economic Assessment
MM&A completed an initial economic assessment to
 
determine the potential economic viability of
resources
 
exclusive
 
of reserves.
 
Unlike
 
the economic
 
analysis presented
 
in
Section
 
19 developed
to test reserves, the initial economic assessment below is presented
 
on a real basis in 2022 dollars.
 
MM&A
 
applied
 
relevant
 
technical
 
factors
 
to
 
estimate
 
potential
 
saleable
 
tonnes
 
without
 
the
resource
 
blocks,
 
should
 
the
 
resources
 
be
 
extracted
 
via
 
deep,
 
continuous
 
mining
 
methods
 
(given
that their irregular and isolated nature
may
 
preclude longwall mining).
 
MM&A
 
developed
 
cash
 
cost
 
profiles
 
for
 
the
 
resource
 
blocks,
 
including
 
direct
 
cash
 
costs
 
(labor,
supplies,
 
roof
 
control,
 
maintenance
 
and
 
repair,
 
power,
 
and
 
other);
 
washing,
 
trucking,
 
materials
handling, general
 
and administrative,
 
and environmental
 
costs;
 
and indirect
 
cash
 
costs
 
(royalties,
production
 
taxes,
 
property tax,
 
insurance).
 
Costs were
 
developed
 
based off
 
relevant
 
cost
 
drivers
(per-meter,
 
per-raw-tonne,
 
per-clean-tonne).
 
Additionally,
 
MM&A
 
estimated
 
capital
 
costs
 
to
extract
 
resources.
 
Capital
 
costs
 
associated
 
with
 
mine
 
development
 
were
 
amortized
 
across
 
the
resource’s
 
potential saleable tonnages.
 
Additional non-cash items (depreciation of equipment and
depletion)
 
and
 
cash
 
costs
 
were
 
compared
 
to
 
an
 
assumed
 
sale
 
price
 
of
 
$110
 
per
 
tonne
 
(FOB
loadout),
 
representing
 
the
 
long-term
 
average
 
price forecast
 
for
 
Buchanan supplied
 
by
 
Coronado.
 
The
 
results
 
of
 
the
 
analysis
 
are
 
shown
 
below
 
and
 
demonstrate
 
potential
 
profitability
 
on
 
a
 
fully
loaded cost basis.
 
Detailed summaries are shown in
Appendix D
.
 
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex962p38i1
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
30
Table 11-4:
 
Results of Initial Economic Assessment
Seam
Resource
Block
Direct Cash
Transportation,
Washing, Enviro,
G&A
Indirect
Non-Cash
Total Cost
Fully
Loaded P&L
P3
N, NE, NW
$58.63
$14.14
$7.52
$16.77
$97.06
$13.18
Figure 11-5:
 
Results of Initial Economic Assessment
11.4
Qualified Person’s Opinion
While there is
 
some level of stratigraphically
 
controlled seam-thickness
 
variability,
 
the Pocahontas
No.
 
3
 
coal
 
seam
 
at
 
Buchanan
 
demonstrates
 
reasonable
 
thickness
 
consistency
 
according
 
to
 
the
classification
 
system
 
of
measured
 
(0
 
–
 
0.4
 
kilometer),
indicated
 
(0.4
 
to
 
1.2
 
kilometers),
 
and
inferred
 
(1.2
 
to
 
4.8
 
kilometers).
 
MM&A
 
geologists
 
and
 
engineers
 
modeled
 
the
 
deposit
 
and
delineated
 
mineable
 
regions
 
to
 
reflect
 
the
 
nature
 
of
 
each
 
seam
 
and
 
the
 
practicality
 
of
 
mining
constraints.
 
Based
 
on
 
MM&A’s
 
geostatistical
 
analysis,
 
it
 
would
 
be
 
possible
 
to
 
extend
 
the
measured arcs slightly
 
beyond historically accepted
 
practices due to consistent
 
geological settings.
 
These results
 
have
 
led the
 
QPs to
 
report the
 
data following
 
the historical
 
classification standards,
rather than use the results of the DHSA.
Based on the data
 
review,
 
the attendant work
 
done to verify the data
 
integrity and the creation
 
of
an
 
independent
 
geologic model,
 
the
 
QPs
 
believe
 
this
 
is a
 
fair
 
and
 
accurate
 
representation
 
of the
Buchanan coal resources.
12
Mineral Reserve Estimates
12.1
Assumptions, Parameters and Methodology
Coal
 
Reserves
 
are
 
classified
 
as
proven
 
or
probable
 
considering
 
“modifying
 
factors”
 
including
mining,
 
metallurgical,
 
economic,
 
marketing,
 
legal,
 
environmental,
 
social,
 
and
 
governmental
factors.
 
 
 
ex962p2i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
31
>
Proven Coal Reserves
 
are the economically mineable part of a measured coal resource,
adjusted for diluting materials and allowances for losses when the material is mined.
 
It is based
on appropriate assessment and studies in consideration of and adjusted
 
for reasonably
assumed modifying factors.
 
These assessments demonstrate that extraction
 
could be
reasonably justified at the time of reporting.
 
>
Probable Coal Reserves
 
are the economically mineable part of an indicated coal resource, and
in some circumstances a measured coal resource, adjusted
 
for diluting materials and
allowances for losses when the material is mined.
 
It is based on appropriate assessment and
studies in consideration of and adjusted for
 
reasonably assumed modifying factors.
 
These
assessments demonstrate that extraction
 
could be reasonably justified at the time of reporting.
 
Upon
 
completion
 
of delineation
 
and calculation
 
of coal
 
resources,
 
MM&A generated
 
a LOM
 
plan
for
 
Buchanan.
 
The
 
footprint
 
of the
 
reserve
 
area
 
is
 
shown
 
on
 
the
 
map
 
in
Appendix B
.
 
The
 
Mine
plan was
 
generated
 
based on
 
the forecast
 
mine plan
 
and permit
 
plan provided
 
by Coronado
 
with
modifications by
 
MM&A where
 
necessary due
 
to current
 
property control
 
limits, modifications
 
to
geologic mapping, or other factors determined during the evaluation.
Carlson
 
Mining
 
software
 
was
 
used
 
to
 
generate
 
the
 
LOM
 
plan
 
for
 
Buchanan.
 
The
 
mine
 
plan
 
was
sequenced
 
based
 
on
 
productivity
 
schedules
 
provided
 
by
 
Coronado.
 
MM&A
 
judged
 
the
productivity
 
estimates
 
and
 
plans
 
to
 
be
 
reasonable
 
based
 
on
 
experience
 
and
 
current
 
industry
practice.
At
 
the
 
Buchanan
 
No.
 
1
 
Mine,
 
a
 
minimum
 
mining
 
height
 
of
 
1.83
 
meters
 
was
 
used
 
due
 
to
 
the
longwall mining method being employed.
 
For coal seams thinner than the assigned mining height,
the difference
 
between the
 
coal seam
 
height and
 
assigned mining
 
height consists
 
of out-of-seam
dilution (
OSD
).
 
Mine recovery
 
generally varies
 
between 40
 
and 60
 
percent for
 
continuous mining
panels,
 
and 100
 
percent
 
for
 
longwall.
 
Plant
 
recovery
 
is a
 
function
 
of in-seam
 
recovery,
 
OSD and
plant
 
efficiency
 
factor,
 
which
 
is
 
set
 
at
 
95
 
percent.
 
Typical
 
entry
 
width
 
is
 
5.79
 
meters
 
to
 
6.10
meters.
Raw,
 
ROM
 
production
 
data
 
outputs
 
from
 
LOM
 
plan
 
sequencing
 
were
 
processed
 
into
 
Microsoft
®
EXCEL spreadsheets
 
and summarized
 
on an
 
annual basis
 
for processing
 
into the
 
economic model.
 
Average
 
seam
 
densities
 
were
 
estimated
 
to
 
determine
 
raw
 
coal
 
tonnes
 
produced
 
from
 
the
 
LOM
plan.
 
Average
 
mine recovery
 
and
 
wash
 
recovery
 
factors
 
were
 
applied to
 
determine
 
coal
 
reserve
tonnes.
 
Coal reserve
 
tonnes in
 
this evaluation
 
are reported
 
at a
 
6.0-percent moisture
 
basis and
 
represent
the saleable product from the Property.
Pricing
 
data
 
as
 
provided
 
by
 
Coronado
 
is
 
described
 
in
Section
 
16.2
.
 
The
 
pricing
 
data
 
assumes
 
a
weighted
 
average
 
domestic
 
and
 
international
 
FOB-mine
 
price
 
of
 
approximately
 
$179
 
per
 
metric
tonne
 
for
 
calendar
 
year
 
2023.
 
The
 
weighted
 
average
 
price
 
decreases
 
to
 
approximately
 
$132
 
to
$143 per metric tonne through
 
year 2027 and averages
 
approximately $153
 
per metric tonne over
the LOM.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
32
The coal resource
 
mapping and estimation
 
process described in
 
this report was
 
used as a basis
 
for
the coal reserve
 
estimate.
 
Proven and
 
probable coal
 
reserves were
 
derived from
 
the defined coal
resource
 
considering
 
relevant
 
processing,
 
economic
 
(including
 
technical
 
estimates
 
of
 
capital,
revenue,
 
and
 
cost),
 
marketing,
 
legal,
 
environmental,
 
socio-economic,
 
and
 
regulatory
 
factors
 
and
are presented on a moist, recoverable
 
basis.
As is
 
customary in
 
the US,
 
the categories
 
for proven
 
and probable
 
coal reserves
 
are based
 
on the
distances
 
from
 
valid
 
points
 
of
 
measurement
 
as
 
determined
 
by
 
the
 
QPs
 
for
 
the
 
area
 
under
consideration.
 
For this
 
evaluation, measured
 
resource, which
 
may convert
 
to a
 
proven reserve,
 
is
based on a 0.4-kilometer radius from a valid point of observation.
Points
 
of observation
 
include exploration
 
drill holes,
 
degas holes,
 
and mine
 
measurements which
have been fully vetted
 
and processed into a
 
geologic model.
 
The geologic model is based on seam
depositional
 
modeling,
 
the
 
interrelationship
 
of
 
overlying
 
and
 
underlying
 
strata
 
on
 
seam
mineability,
 
seam
 
thickness
 
trends,
 
the
 
impact
 
of
 
seam
 
structure
 
(i.e.,
 
faulting),
 
intra-seam
characteristics,
 
etc.
 
Once
 
the
 
geologic
 
model
 
was
 
completed,
 
a
 
statistical
 
analysis,
 
described
 
in
Section
 
11.1.1
 
was
 
conducted
 
and
 
a
 
0.4-kilometer
 
radius
 
from
 
a
 
valid
 
point
 
of
 
observation
 
was
selected to define Measured Resources.
 
Likewise,
 
the distance
 
between 0.4
 
and 1.2 of
 
a kilometer
 
radius was
 
selected to
 
define Indicated
Resources.
 
Indicated Resources may convert
 
to Probable Reserves.
 
There
 
are
 
no
 
Inferred
 
Resources
 
(greater
 
than
 
a
 
1.2-kilometer
 
radius
 
from
 
a
 
valid
 
point
 
of
observation) at Buchanan.
12.2
Qualified Person’s Estimates
Reserve tonnage
 
estimates provided
 
herein report
 
coal reserves
 
derived from
 
the in-situ resource
tonnes presented in
Table 11-3
, and not in addition to coal resources.
 
Coal reserves are presented
on a
 
ROM basis
 
in
Table
 
12-1
.
 
Proven
 
and probable
 
coal reserves
 
were derived
 
from the
 
defined
coal
 
resource
 
considering
 
relevant
 
mining,
 
processing,
 
infrastructure,
 
economic
 
(including
estimates
 
of
 
capital,
 
revenue,
 
and
 
cost),
 
marketing,
 
legal,
 
environmental,
 
socio-economic
 
and
regulatory factors.
 
The coal reserves,
 
as shown in
Table
 
12-2
, are based
 
on a technical
 
evaluation
of
 
the
 
geology
 
and
 
a
 
preliminary
 
feasibility
 
study
 
of
 
the
 
coal
 
deposits.
 
The
 
extent
 
to
 
which
 
the
coal
 
reserves
 
may
 
be
 
affected
 
by
 
any
 
known
 
environmental,
 
permitting,
 
legal,
 
title,
 
socio-
economic,
 
marketing,
 
political,
 
or
 
other
 
relevant
 
issues
 
has
 
been
 
reviewed
 
rigorously.
 
Similarly,
the
 
extent
 
to
 
which
 
the
 
estimates
 
of
 
coal
 
reserves
 
may
 
be
 
materially
 
affected
 
by
 
mining,
metallurgical, infrastructure
 
and other relevant factors has also been considered.
 
Table 12-1:
 
Coal ROM (Moist) Summary as of December 31, 2022
 
Demonstrated Coal Reserves (Mt, Moist ROM)
Quality (Dry)
 
By Reliability Category
By Mining Type
By Control Type
Area /
Mine
Proven
Probable
Total
Surface
UG
Owned
Leased
Subleased
Ash
Sulfur
Vol
Buchanan
144.9
8.7
153.6
0.0
153.6
21.7
127.9
4.0
42
0.7
12
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
33
Table 12-2:
 
Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022
 
Demonstrated Coal Reserves (Wet Tons,
 
Washed or Direct Shipped, Mt)
Quality (Dry Basis)
 
By Reliability Category
By Mining Type
By Control Type
Area / Mine
Proven
Probable
Total
Surface
UG
Owned
Leased
Subleased
Ash%
Sulfur%
VM%
Buchanan Mine Complex
87.5
5.4
92.9
0.0
92.9
14.4
75.9
2.6
6
0.7
19
 
Note: Marketable reserve tonnes are reported on a moist basis, including a combination of surface and inherent moisture.
 
The combination of
surface and inherent moisture is modeled 6-percent.
 
Actual product moisture is dependent upon multiple geological factors, operational
factors, and product contract specifications and can exceed 8-percent.
 
As such, the modeled moisture values provide a level of conservatism
for reserve reporting.
As shown below,
 
coal shipments during 2022 (primarily from the northern portion of the Property)
exhibit a year-to-date
 
average quality comparable
 
to quality projected
 
from core samples (refer
 
to
Table 12-2
 
above).
 
>
Moisture content: 8.3%
>
Ash content: 5.8% (db)
>
Sulfur content: 0.7% (db)
>
VM content: 17% (db)
The
 
results
 
of
 
this
 
TRS
 
define
 
an
 
estimated
 
92.9
 
Mt
 
of
 
proven
 
and
 
probable
 
marketable
 
coal
reserves.
 
Of that
 
total, 94
 
percent are
 
proven, and
 
6 percent
 
are probable.
 
There are
 
14.4 Mt
 
of
owned
 
coal
 
reserves
 
and
 
75.9
 
Mt
 
of
 
leased
 
coal
 
and
 
2.6
 
Mt
 
of
 
subleased
 
reserves.
 
All
 
the
Buchanan reserves are considered suitable for the metallurgical
 
coal market, and all are assigned.
12.3
Qualified Person’s Opinion
The
 
estimate
 
of coal
 
reserves was
 
determined
 
in accordance
 
with the
 
JORC
 
Code along
 
with SEC
Regulation S-K 1300.
The
 
LOM
 
mining
 
plan
 
for
 
Buchanan
 
was
 
prepared
 
to
 
the
 
level
 
of
 
preliminary
 
feasibility.
 
Mine
projections
 
were
 
prepared
 
with
 
a
 
timing
 
schedule
 
to
 
match
 
production
 
with
 
coal
 
seam
characteristics.
 
Production timing
 
was carried
 
out from
 
current locations
 
to depletion
 
of the
 
coal
reserve
 
area.
 
Coal reserve
 
estimates
 
could be
 
materially
 
affected
 
by the
 
risk factors
 
described in
Section 22.2
.
 
Based on the preliminary feasibility study and the attendant economic review,
 
the QPs believe this
is a fair and accurate calculation of the Buchanan coal reserves.
13
Mining Methods
13.1
Geotech and Hydrology
Mining
 
plans
 
for
 
potential
 
underground
 
mines
 
were
 
developed
 
by
 
Coronado
 
and
 
MM&A.
 
Pillar
stability
 
was
 
tested
 
by
 
MM&A
 
using
 
the
Analysis
 
of
 
Retreat
 
Mining
 
Pillar
 
Stability
 
(ARMPS
)
 
and
Analysis of Longwall Pillar Stability
(
ALPS
) programs that
 
were developed by the
National Institute
 
 
ex962p2i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
34
for
 
Occupational
 
Safety
 
and
 
Health
 
(
NIOSH
)
.
 
MM&A reviewed
 
the
 
results
 
from
 
the
 
ARMPS
 
and
ALPS analysis and considered them in the development of the LOM plan.
Hydrology
 
has not
 
been an
 
issue of
 
concern at
 
Buchanan.
 
Based on
 
numerous
 
site visits
 
to both
the surface and underground portions of the Property by the QPs,
 
it has been determined that this
is not
 
a significant
 
concern.
 
Mining of future
 
reserves is
 
projected to
 
occur in areas
 
which exhibit
similar hydrogeological characteristics
 
as those formerly mined areas.
13.2
Production Rates
The
 
Buchanan
 
mine
 
is
 
active
 
with
 
six
 
continuous
 
mining
 
sections
 
and
 
one
 
longwall
 
section
currently operating.
 
Operations at Buchanan
 
by Coronado and its
 
predecessor have been
 
ongoing
for
 
many
 
years.
 
The
 
mine
 
plan
 
and
 
productivity
 
expectations
 
reflect
 
historical
 
performance
 
and
efforts
 
have
 
been
 
made to
 
adjust
 
the
 
plan
 
to
 
reflect
 
future
 
conditions.
 
MM&A
 
is confident
 
that
the
 
mine
 
plan
 
is
 
reasonably
 
representative
 
to
 
provide
 
an
 
accurate
 
estimation
 
of
 
coal
 
reserves.
 
Mine development and operation have not been optimized
 
within the TRS.
Longwall production
 
is scheduled
 
for
 
approximately
 
295 to
 
312 days
 
each year,
 
which represents
production
 
on
 
Monday
 
through
 
Saturday
 
with
 
allowances
 
for
 
holidays
 
and
 
longwall
 
moves.
 
On
each day,
 
the continuous
 
mining sections
 
and longwall
 
produce coal
 
on three
 
shifts.
 
The sections
are
 
configured
 
as
 
regular
 
sections
 
with
 
one
 
continuous
 
miner
 
available
 
for
 
production
 
on
 
each
section.
 
Productivity is
 
planned at
 
the rate
 
of 18.2
 
meters
 
to 21.3
 
meters
 
of advance
 
per shift
 
of
operation for
 
the continuous
 
miner sections, and
 
5.79 meters
 
to 7.32
 
meters per
 
shift of longwall
retreat.
 
A second longwall is scheduled to begin production in the first quarter of 2025.
Carlson
 
Mining
 
software
 
was
 
used
 
by
 
MM&A
 
to
 
generate
 
mine
 
plans
 
for
 
the
 
underground
mineable
 
coal
 
seam.
 
Coronado
 
recently
 
revised
 
the
 
Buchanan
 
mine
 
plan
 
with
 
an
 
independent
headgate and
 
tailgate for
 
longwall panels in
 
the South and Northeast
 
districts.
 
Such a change
 
was
made
 
to
 
allow
 
for
 
an
 
effective
 
panel
 
width
 
of
 
982
 
feet,
 
as
 
opposed
 
to
 
an
 
effective
 
width
 
of
 
688
feet
 
used
 
previously.
 
The
 
active
 
areas
 
in
 
the
 
North
 
and
 
East,
 
along
 
with
 
the
 
future
 
Northwest
area,
 
are still
 
based on
 
an effective
 
panel width
 
of approximately
 
688 feet.
 
MM&A incorporated
this mine
 
plan revision
 
into the
 
layout and
 
subsequent reserve
 
estimates contained
 
herein.
 
Mine
plans were
 
sequenced based
 
on productivity
 
schedules provided
 
by Coronado,
 
which were
 
based
on
 
historically
 
achieved
 
productivity
 
levels.
 
All
 
production
 
forecasting
 
ties
 
assumed
 
production
rates to geological models as constructed
 
by MM&A’s
 
team of geologists and mining engineers.
As shown in
Table
 
13-1
, the areas planned for underground
 
production continue until 2044.
 
Clean
coal production varies directly with coal thickness.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
35
Table 13-1:
 
Summary of Production by Year (Tonnes
 
x 1,000)
Mine Name
2023
2024
2025
2026
2027
2028
2029
2030
Buchanan
3,786
3,811
4,363
4,446
5,112
6,242
6,462
6,200
 
 
 
 
 
 
 
 
 
Mine Name
2031
2032
2033
2034
2035
2036
2037
2038
Buchanan
5,444
6,226
4,814
6,474
6,423
5,249
3,447
3,009
 
 
 
 
 
 
 
 
 
Mine Name
2039
2040
2041
2042
2043
2044
2045
2046
Buchanan
2,914
2,093
2,254
1,703
1,714
737
0
0
13.3
Mining Related Requirements
Although the continuous miner
 
sections are significantly more
 
expensive to operate
 
on a cost-per-
tonne basis,
 
they are
 
necessary to open
 
up areas
 
of the mine
 
for the
 
longwall.
 
At the
 
time of this
study,
 
Buchanan
 
had
 
6
 
operating
 
continuous
 
miner
 
stations
 
that
 
were
 
used
 
to
 
develop
 
main
entries and
 
gate roads
 
in preparation
 
for the
 
longwall.
 
As the mine
 
develops, this
 
number will
 
be
able to be reduced.
An additional
 
requirement at
 
Buchanan is the
 
drilling of degas
 
holes prior to
 
mining.
 
This process
was
 
initially
 
developed
 
as
 
a
 
safety
 
measure
 
to
 
extract
 
methane
 
from
 
the
 
coal
 
seam
 
prior
 
to
exposure to the workforce.
 
As such, it has been very effective.
More
 
recently,
 
the
 
methane
 
extracted
 
has
 
been
 
able
 
to
 
be
 
processed
 
and
 
sold.
 
However,
degasifying of the coal seam will continue as a safety measure regardless.
13.4
Required Equipment and Personnel
The
 
Buchanan
 
Mine
 
is
 
currently
 
Coronado’s
 
only
 
longwall
 
operation.
 
The
 
longwall
 
shearing
machine is used
 
for extraction
 
of coal at
 
the production face.
 
A chain conveyor
 
is used to
 
remove
coal from
 
the longwall
 
face for
 
discharge
 
onto the
 
conveyor
 
belt which
 
then ultimately
 
delivers
 
it
to an
 
underground
 
storage
 
bunker.
 
Development for
 
the longwall
 
is conducted
 
by the
 
extraction
of
 
coal
 
from
 
the
 
production
 
faces
 
using
 
continuous
 
miners
 
and
 
haulage
 
using
 
shuttle
 
cars
 
to
 
a
feeder-breaker
 
located
 
at the
 
tail of
 
the section
 
conveyor
 
belt.
 
The feeder
 
-breaker
 
crushes large
pieces
 
of
 
coal
 
and
 
rock
 
and
 
regulates
 
coal
 
feed
 
onto
 
the
 
mine
 
conveyor.
 
Roof-bolting
 
machines
are
 
used
 
to
 
support
 
the
 
roof
 
on
 
the
 
development
 
sections
 
of
 
the
 
longwall
 
mines.
 
Roof-bolting
machines are
 
used to
 
install roof
 
bolts, and battery
 
scoops are
 
available to
 
clean the
 
mine entries
and
 
assist
 
in
 
delivery
 
of
 
mine
 
supplies
 
to
 
work
 
areas.
 
Other
 
supplemental
 
equipment
 
such
 
as
personnel carriers, supply vehicles, etc., are also used daily.
Mine
 
conveyors
 
typically
 
range
 
in
 
width
 
up to
 
1.83
 
meters.
 
Multiple
 
belt
 
flights
 
are
 
arranged
 
in
series to
 
deliver raw
 
coal to
 
the underground
 
storage.
 
Along the
 
main and
 
sub-main entries
 
and
panels, a
 
travel
 
way is
 
provided for
 
personnel and
 
materials by
 
rubber-tired
 
equipment or
 
on rail.
 
The
 
Buchanan
 
No.
 
1
 
Mine
 
utilizes
 
a
 
skip
 
hoist
 
in
 
order
 
to
 
transport
 
ROM
 
coal
 
from
 
the
underground storage
 
bunker to
 
the surface
 
where the
 
coal may
 
be sampled,
 
crushed and washed
in the preparation plant and stockpiled to await
 
shipment.
 
 
 
ex962p2i0
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
36
Surface
 
ventilation
 
fans
 
are
 
installed
 
as
 
needed
 
to
 
provide
 
a
 
sufficient
 
volume
 
of
 
air
 
to
 
ventilate
production
 
sections,
 
coal
 
haulage
 
and
 
transport
 
entries,
 
battery
 
charging
 
stations,
 
and
transformers
 
in
 
accordance
 
with
 
approved
 
plans.
 
High-voltage
 
cables
 
deliver
 
power
 
throughout
the
 
mine
 
where
 
transformers
 
reduce
 
voltage
 
for
 
specific
 
equipment
 
requirements.
 
The
 
Mine
Improvement
 
and
 
New
 
Emergency
 
Response
 
Act
 
of
 
2006
 
(
MINER
 
Act
)
 
requires
 
that
 
carbon
monoxide
 
detection
 
systems
 
be installed
 
along mine
 
conveyor
 
belts
 
and that
 
electronic
 
two-way
tracking
 
and
 
communications
 
systems
 
be
 
installed
 
throughout
 
underground
 
mines.
 
Water
 
is
required
 
to
 
control
 
dust
 
at
 
production
 
sections
 
and
 
along
 
conveyor
 
belts,
 
and
 
to
 
cool
 
electric
motors.
 
Water
 
is available
 
from nearby
 
sources and
 
is distributed
 
within the mine
 
by pipelines as
required.
 
A total of 588 salary and hourly
 
employees are assigned to
 
the mine in 2023, and a total
of 672
 
salary and
 
hourly employees
 
are assigned
 
to the
 
mine beginning
 
in 2025
 
when the
 
second
longwall begins operation.
 
14
Processing and Recovery Methods
14.1
Description or Flowsheet
Coronado currently
 
operates a
 
coal preparation
 
plant at
 
Buchanan.
 
The Buchanan Plant
 
operates
at
 
a feed
 
rate
 
of approximately
 
1,270 raw
 
tonnes per
 
hour (
tph
).
 
Coarse
 
material
 
is washed
 
in a
heavy
 
medium
 
vessel,
 
the
 
intermediate-size
 
material
 
is
 
washed
 
in
 
heavy
 
medium
 
cyclones
 
and
fine
 
material
 
is
 
washed
 
using
 
froth
 
flotation.
 
These
 
processes
 
are
 
supported
 
by
 
the
 
requisite
screens,
 
centrifuges,
 
vacuum
 
filters,
 
sumps,
 
pumps,
 
and
 
distribution
 
systems.
 
Processes
 
and
equipment
 
are typical
 
of those
 
used in
 
the coal
 
industry and
 
are in
 
use in
 
nearly all
 
plants in
 
the
Central Appalachian Basin.
 
14.2
Requirements for Energy,
 
Water,
 
Material and Personnel
Personnel
 
have
 
historically
 
been
 
sourced
 
from
 
the
 
surrounding
 
communities
 
in
 
Buchanan,
Tazewell,
 
McDowell,
 
and
 
Pike
 
Counties,
 
and
 
have
 
proven
 
to
 
be
 
adequate
 
in numbers
 
to
 
operate
the mine.
 
As mining is
 
common in the
 
surrounding areas,
 
the workforce
 
is generally
 
familiar with
mining practices, and many are experienced miners.
The
 
Buchanan No.
 
1 Mine
 
Complex
 
has
 
sources
 
of water,
 
power,
 
personnel,
 
and
 
supplies readily
available
 
for
 
use.
 
Water
 
is
 
sourced
 
locally
 
from
 
a
 
nearby
 
abandoned
 
underground
 
mine.
 
Electricity
 
is
 
sourced
 
from
 
AEP.
 
The
 
service industry
 
in
 
the
 
areas
 
surrounding
 
the
 
mine
 
complex
has historically provided supplies, equipment repairs
 
and fabrication, etc.
15
Infrastructure
The Coronado-owned
 
Buchanan Preparation
 
Plant services the
 
mine via a
 
skip hoist
 
and conveyor
belt
 
system
 
which
 
transports
 
extracted
 
coal
 
from
 
an
 
underground
 
bunker
 
to
 
the
 
surface
 
facility.
 
The NS rail line serves as the main means of transport from the mine.
 
 
ex962p2i0
 
ex962p45i1
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
37
As an
 
active operation,
 
the necessary
 
support infrastructure
 
for
 
Buchanan is
 
in place.
 
In addition
to
 
the
 
plant
 
and
 
loadout,
 
there
 
are
 
also
 
portal
 
facilities,
 
including
 
personnel
 
access
 
to
 
the
 
mine,
ventilation fans and a coal hoisting skip shaft.
 
A map of the existing facilities in
Figure 15-1
.
Figure 15-1:
 
Buchanan Surface Facilities
16
Market Studies
16.1
Market Description
The quality
 
characteristics for
 
the subject
 
coal resources
 
and coal
 
reserves have
 
been reviewed
 
in
detail
 
by MM&A.
 
The drill
 
hole data
 
were
 
utilized to
 
develop
 
average
 
coal quality
 
characteristics
for
 
the mining
 
site.
 
These average
 
coal
 
quality characteristics
 
were
 
then utilized
 
as the
 
basis for
determining the various markets into which the saleable coal will likely
 
be placed.
 
The projected quality specifications for the Buchanan products are
 
as shown in
Table 16-1
.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
38
Table 16-1:
 
Quality Specifications by Product
 
Buchanan
 
HCC
PCI
Moisture (%)
7.50
7.50
Ash (%)
5.50
6.00
Sulfur (%)
0.75
0.85
Volatile Matter (%)
18.00
18.00
Btu/lb.
N/A
14,926
Fluidity (ddpm)
130
N/A
MMR (%)
1.69
N/A
CSR
40
N/A
FSI
8.5
N/A
Note:
 
All Specs are dry basis except Moisture and Thermal
All the
 
mine production
 
serves the
 
metallurgical markets.
 
The metallurgical
 
coal is
 
marketed
 
as a
low-volatile (typically less than 23 percent
 
volatile matter content) product.
16.2
Price Forecasts
Coronado
 
provided
 
MM&A
 
with
 
price
 
forecasts
 
for
 
the
 
Buchanan
 
operation.
 
Customer
 
coal
pricing is
 
derived from
 
market
 
observed forward
 
estimates
 
based on
 
global economic
 
supply and
demand
 
analysis
 
which
 
is
 
applied
 
to
 
mine
 
plan
 
sales
 
volumes
 
and
 
product
 
mix
 
and
 
is
supplemented
 
with
 
Coronado’s
 
in-house
 
knowledge
 
of
 
applicable
 
rail
 
transportation
 
charges,
ocean
 
freight
 
charges
 
and
 
port
 
charges.
 
Concurrent
 
with
 
the
 
active
 
operation,
 
Buchanan’s
production
 
is
 
assumed
 
to
 
enter
 
domestic
 
and
 
international
 
low
 
volatile
 
coking
 
coal
 
markets.
 
Pricing
 
provided
 
by
 
Coronado
 
assumes
 
applicable
 
quality
 
adjustments.
 
Pricing
 
was
 
provided
through calendar year 2044.
 
Coal
 
price
 
forecasts
 
for
 
the
 
Buchanan
 
products
 
were
 
provided
 
by
 
Coronado
 
for
 
various
 
coal
markets in terms of US nominal dollars per metric tonne.
 
16.3
Contract Requirements
Some contracts are
 
necessary for successful marketing
 
of the coal.
 
For Buchanan, since all mining,
preparation and marketing is done in-house, the remaining
 
contracts required are:
>
Transportation
 
– The Mine contracts with NS to transport the coal to either the domestic
customers or to the Pier 6 export terminal for
 
overseas shipment.
>
Handling
 
– Contracts for loading vessels for export
 
sales are necessary.
 
These are typically
handled by annual negotiations based on projected shipments.
>
Sales
– Sales contracts are a mix of spot and contract sales.
 
With the volatility of the market,
long-term contracts are not typically written.
 
 
ex962p2i0
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
39
17
Environmental Studies, Permitting and Plans,
Negotiations or Agreements with Local Individuals
 
17.1
Results of Studies
MM&A completed
 
a Limited Phase
 
I Environmental
 
Site Assessment (
ESA
) on the
 
Property in April
2016
 
on
 
behalf
 
of
 
Coronado.
 
Coronado
 
reports
 
not
 
having
 
conducted
 
such
 
a
 
study
 
since
 
the
MM&A
 
study.
 
The
 
ESA
 
completed
 
by
 
MM&A
 
included
 
a
 
site
 
inspection,
 
review
 
of
 
historical
records,
 
a
 
database
 
search
 
of
 
state
 
and
 
federal
 
regulatory
 
records
 
and
 
interviews
 
to
 
identify
potential
 
recognized
 
environmental
 
conditions
 
(
RECs
)
 
that
 
may
 
create
 
environmental
 
liability
 
for
the sites.
 
MM&A concluded that no long-term liabilities existed at the time of the ESA.
Based on the
 
former ESA
 
completed by
 
MM&A, it is the
 
QPs’ opinion that
 
Buchanan generally
 
has
a
 
record
 
consistent
 
with
 
industry
 
standards
 
regarding
 
compliance
 
with
 
applicable
 
mining,
 
water
quality,
 
and
 
environmental
 
laws.
 
Estimated
 
costs
 
for
 
mine
 
closure,
 
including
 
water
 
quality
monitoring during site reclamation, are included in the financial models.
17.2
Requirements and Plans for Waste
 
Disposal
Based on
 
a study
 
commissioned by
 
Coronado in
 
June 2020,
 
the current
 
Buchanan refuse
 
disposal
site adjacent
 
to the
 
preparation
 
plant has
 
a capacity
 
of 29
 
million cubic
 
meters
 
(
CM
) as
 
currently
designed;
 
with
 
an
 
additional
 
lift
 
(No.
 
11),
 
the
 
capacity
 
is 37
 
million
 
CM.
 
Projected
 
requirements
within
 
the
 
MM&A
 
financial
 
model
 
are
 
28.0
 
million
 
CM.
 
Permitting
 
for
 
such
 
an
 
expansion
 
is
anticipated to be achievable.
17.3
Permit Requirements and Status
All
 
mining
 
operations
 
are
 
subject
 
to
 
federal
 
and
 
state
 
laws
 
and
 
must
 
obtain
 
permits
 
to
 
operate
mines,
 
coal
 
preparation
 
and
 
related
 
facilities,
 
haul
 
roads,
 
and
 
other
 
incidental
 
surface
disturbances
 
necessary for
 
mining
 
to
 
occur.
 
Permits
 
generally
 
require
 
that
 
the
 
permittee
 
post
 
a
performance bond
 
in an amount
 
established by
 
the regulatory
 
program to
 
provide assurance
 
that
any
 
disturbance or
 
liability created
 
during mining
 
operations
 
is properly
 
restored
 
to
 
an approved
post-mining
 
land
 
use
 
and
 
that
 
all
 
regulations
 
and
 
requirements
 
of
 
the
 
permits
 
are
 
fully
 
satisfied
before
 
the
 
bond
 
is
 
returned
 
to
 
the
 
permittee.
 
Significant
 
penalties
 
exist
 
for
 
any
 
permittee
 
who
fails
 
to
 
meet
 
the
 
obligations
 
of
 
the
 
permits
 
including
 
cessation
 
of
 
mining
 
operations,
 
which
 
can
lead
 
to
 
potential
 
forfeiture
 
of
 
the
 
bond.
 
Any
 
company,
 
and
 
its
 
directors,
 
owners
 
and
 
officers,
which are subject to bond forfeiture
 
can be denied future permits under the program.
1
New
 
permits
 
or
 
permit
 
revisions
 
will
 
occasionally
 
be
 
necessary
 
to
 
facilitate
 
the
 
expansion
 
or
addition of new
 
mining areas on
 
the properties,
 
such as amendments
 
to existing
 
permits and new
permits for
 
mining of
 
reserve areas.
 
Exploration permits
 
are also
 
required.
 
Property under
 
lease
includes provisions for exploration
 
among the terms of the lease.
 
New or modified mining permits
are subject
 
to a
 
public advertisement
 
process and
 
comment period,
 
and the
 
public is
 
provided an
1
 
Monitored under the Applicant Violator System (AVS) by the Federal Office of Surface Mining.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
40
opportunity
 
to
 
raise
 
objections
 
to
 
any
 
proposed
 
mining
 
operation.
 
MM&A
 
is
 
not
 
aware
 
of
 
any
specific
 
prohibition
 
of
 
mining
 
on
 
the
 
subject
 
property
 
and
 
given
 
sufficient
 
time
 
and
 
planning,
Coronado should
 
be able
 
to secure
 
new permits
 
to maintain
 
its planned mining
 
operations within
the context
 
of current
 
regulations.
 
Necessary permits
 
are in
 
place to
 
support current
 
production
on the
 
Property,
 
but future
 
permits are
 
required to
 
maintain and
 
expand production.
 
Portions of
the
 
Property
 
are
 
located
 
near
 
local
 
communities.
 
Regulations
 
prohibit
 
mining
 
activities
 
within
91.44 meters
 
of a
 
residential dwelling,
 
school, church,
 
or similar
 
structure unless
 
written consent
is
 
first
 
obtained
 
from
 
the
 
owner
 
of
 
the
 
structure.
 
Where
 
required,
 
such
 
consents
 
have
 
been
obtained where mining is proposed beyond the regulatory limits.
Coronado
 
has
 
obtained
 
all
 
mining
 
and
 
discharge
 
permits
 
to
 
operate
 
its
 
mines
 
and
 
processing,
loadout,
 
or
 
related
 
facilities.
 
MM&A
 
is
 
unaware
 
of
 
any
 
obvious
 
or
 
current
 
Coronado
 
permitting
issues that
 
are expected
 
to prevent
 
the issuance
 
of future
 
permits.
 
Buchanan, along
 
with all
 
coal
producers,
 
is subject
 
to a
 
level of
 
uncertainty regarding
 
future clean
 
water
 
permits due
 
to
United
States
 
Environmental
 
Protection
 
Agency
(
EPA
)
and
United
 
States
 
Fish
 
and
 
Wildlife
 
(
USFW
)
involvement with state
 
programs.
The active Mining permit currently held by Buchanan is shown in
Table 17-1.
Table 17-1:
 
Buchanan Mining Permit
Type
Permit ID
Permit Name
$ Bond
Current
Status
Issued Date
Expiration
Date
Hectares
NPDES No.
Coal Underground
1402152
Buchanan No. 1
Mine
$2,484,000
Active
03/08/1983
03/08/2023
334.79
VA0082152
17.4
Local Plans, Negotiations or Agreements
MM&A found no indication of agreements beyond the scope of federal
 
or state regulations.
17.5
Mine Closure Plans
Applicable
 
regulations
 
require
 
that
 
mines
 
be
 
properly
 
closed,
 
and
 
reclamation
 
commenced
immediately
 
upon
 
abandonment.
 
In
 
general,
 
site
 
reclamation
 
includes
 
removal
 
of
 
structures,
backfilling,
 
regrading,
 
and
 
revegetation
 
of
 
disturbed
 
areas.
 
Sediment
 
control
 
is
 
required
 
during
the establishment
 
of vegetation,
 
and bond
 
release generally
 
requires a
 
minimum five-year
 
period
of
 
site
 
maintenance,
 
water
 
sampling,
 
and
 
sediment
 
control
 
following
 
mine
 
completion.
 
This
requirement
 
is
 
reduced
 
to
 
two
 
years
 
for
 
certain
 
operations
 
involving
 
re-mining.
 
Reclamation
 
of
underground
 
mines
 
includes
 
closure
 
and
 
sealing
 
of
 
mine
 
openings
 
such
 
as
 
portals
 
and
 
shafts
 
in
addition to the items listed above.
 
Estimated
 
costs
 
for
 
mine closure,
 
including water
 
quality monitoring
 
during site
 
reclamation,
 
are
included
 
in
 
the
 
financial
 
model.
 
As
 
with
 
all
 
mining
 
companies,
 
an
 
accretion
 
calculation
 
is
performed
 
annually
 
so
 
the
 
necessary
 
Asset
 
Retirement
 
Obligations
 
(
ARO
)
 
can
 
be
 
shown
 
as
 
a
Liability on the balance sheet.
 
 
ex962p2i0
 
ex962p13i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
41
17.6
Qualified Person’s Opinion
The Buchanan Mine is an operating facility; all necessary permits for
 
current production have been
obtained.
 
The QPs
 
know
 
of no reason
 
that any
 
permits revisions
 
that may
 
be required
 
cannot be
obtained.
 
Estimated
 
expenditures
 
for
 
site
 
closure
 
and
 
reclamation
 
are
 
included
 
in
 
the
 
financial
 
model
 
for
this site.
18
Capital and Operating Costs
18.1
Capital Cost Estimate
The production sequence selected for
 
a property must consider the proximity
 
of each reserve area
to
 
coal
 
preparation
 
plants,
 
river
 
docks
 
and
 
railroad
 
loading
 
points,
 
along
 
with
 
suitability
 
of
production
 
equipment
 
to
 
coal
 
seam
 
conditions.
 
The
 
in-place
 
infrastructure
 
was
 
evaluated,
 
and
any future
 
needs were
 
planned to
 
a level
 
suitable for
 
a Preliminary
 
Feasibility Study
 
and included
in the Capital Forecast.
Coronado
 
provided
 
MM&A
 
with
 
an
 
inventory
 
of
 
operating
 
equipment
 
available
 
at
 
Buchanan.
 
MM&A’s
 
capital
 
schedules assume
 
that
 
major
 
equipment
 
rebuilds
 
occur over
 
the
 
course
 
of each
machine’s
 
remaining
 
assumed
 
operating
 
life.
 
Replacement
 
equipment
 
was
 
scheduled
 
based
 
on
MM&A’s
 
experience and
 
knowledge of
 
mining equipment
 
and industry
 
standards
 
with respect
 
to
the useful life of such equipment.
A summary of the estimated capital for the Property is provided
 
in
Figure 18-2
 
below.
 
Figure 18-1:
 
CAPEX
 
 
ex962p2i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
42
18.2
Operating Cost Estimate
Coronado provided historical and a preliminary five-year
 
projection of operating costs for MM&A’s
review.
 
MM&A used the historical and/or budget cost information
 
as a reference and developed a
personnel
 
schedule
 
for
 
the
 
mine.
 
Hourly
 
labor
 
rates
 
and
 
salaries
 
were
 
based
 
upon
 
information
contained
 
in
 
Coronado’s
 
financial
 
summaries.
 
Fringe-benefit
 
costs
 
were
 
developed
 
for
 
vacation
and holidays,
 
federal
 
and state
 
unemployment insurance,
 
retirement, workers’
 
compensation and
pneumoconiosis,
 
casualty
 
and
 
life
 
insurance,
 
healthcare,
 
and
 
bonuses.
 
A
 
cost
 
factor
 
for
 
mine
supplies was developed that
 
relates expenditures to
 
mine advance rates
 
for roof-control
 
costs and
other
 
mine-supply
 
costs
 
experienced
 
at
 
underground
 
mines.
 
Other
 
factors
 
were
 
developed
 
for
maintenance and repair costs, rentals, mine power,
 
outside services and other direct mining costs.
 
Other
 
cost
 
factors
 
were
 
developed
 
for
 
coal
 
preparation
 
plant
 
processing,
 
refuse
 
handling,
 
coal
loading, property
 
taxes,
 
and insurance
 
and bonding.
 
Appropriate
 
royalty
 
rates
 
were
 
assigned for
production
 
from leased
 
coal lands,
 
and sales
 
taxes
 
were
 
calculated
 
for
 
state
 
severance
 
taxes,
 
the
federal black lung excise tax,
 
and federal and state reclamation
 
fees.
Mandated Sales Related Costs such as Black Lung Excise are
 
summarized in
 
Table 18-1.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
43
Table 18-1:
 
Estimated Coal Production Taxes
 
and Sales Costs
Description of Tax or Sales Cost
Basis of Assessment
Cost
Federal Black Lung Excise Tax - Underground
Per Tonne
$1.21
 
Federal Reclamation Fees – Underground
Per Tonne
$0.13
 
Virginia Reclamation Tax – Underground
Per Tonne
$0.05
 
Virginia Severance Tax
 
2%
Royalties – Underground
Percentage of Revenue
4.0%
Notes:
 
1.
Federal black lung excise tax is paid only on coal sold domestically.
 
MM&A assumed 45% of total
coal sales to be domestic in the economic analysis discussed below.
 
A summary of the projected Operating Costs is in
Table 18-2
.
Table 18-2:
 
Buchanan Mine Operating Costs
 
 
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
Remaining
 
Total
2023
2024
2025
2026
2027
2028
2029
2030
LOM Average
ROM Production Tonnes
153.6
7.4
7.5
8.8
9.5
11.1
9.4
9.4
9.2
5.8
Yield
60.48%
50.98%
50.61%
49.81%
46.98%
46.16%
66.22%
68.89%
67.70%
64.48%
Saleable Production Tonnes
92.9
3.8
3.8
4.4
4.4
5.1
6.2
6.5
6.2
3.8
 
Thermal Tonnes
-
-
-
-
-
-
-
-
-
-
Dommestic & Non-Asia
Export Met Tonnes
29.9
1.2
1.2
1.4
1.4
1.6
2.0
2.1
2.0
1.2
Export Met Tonnes
63.0
2.6
2.6
3.0
3.0
3.5
4.2
4.4
4.2
2.5
 
Total Saleable Tonnes
92.9
3.8
3.8
4.4
4.4
5.1
6.2
6.5
6.2
3.8
 
Cash Costs per Tonne:
Mining Costs
$65.99
$66.53
$66.60
$64.95
$64.94
$58.16
$51.67
$50.89
$53.95
$71.83
Processing and Transport
$8.22
$20.33
$9.40
$9.03
$9.11
$8.84
$6.32
$6.20
$6.44
$7.74
Sales Related Costs
$9.48
$9.78
$8.92
$8.04
$7.64
$8.60
$8.68
$8.84
$9.01
$10.05
G&A
$2.65
$3.79
$2.89
$2.54
$2.54
$2.27
$2.32
$2.36
$2.41
$2.70
 
Total Cash Costs
$86.33
$100.43
$87.80
$84.55
$84.24
$77.88
$68.98
$68.30
$71.81
$92.31
19
Economic Analysis
19.1
Assumptions, Parameters and Methods
A
 
pre-feasibility
 
LOM
 
plan
 
was
 
prepared
 
by
 
MM&A
 
for
 
the
 
Buchanan
 
operations.
 
MM&A
prepared
 
mine
 
projections
 
and
 
production
 
timing
 
forecasts
 
based
 
on
 
coal
 
seam
 
characteristics.
 
Production
 
timing was
 
carried out
 
from 2023
 
to depletion
 
(exhaustion)
 
of the
 
coal reserve
 
areas,
which is projected for the year 2044.
 
All costs and prices are based on 2022 nominal United States
dollars.
The
 
Mine
 
plan,
 
productivity
 
expectations
 
and
 
cost
 
estimates
 
generally
 
reflect
 
historical
performance by
 
Coronado and
 
efforts
 
have been
 
made to
 
adjust plans
 
and costs
 
to reflect
 
future
conditions.
 
MM&A
 
is
 
confident
 
that
 
the
 
mine
 
plan
 
and
 
financial
 
model
 
are
 
reasonably
representative to provide
 
an accurate estimation of coal reserves.
Capital
 
schedules were
 
developed by
 
MM&A for
 
mine development,
 
infrastructure,
 
and on-going
capital
 
requirements
 
for
 
the
 
life
 
of the
 
mine.
 
Staffing
 
levels
 
were
 
prepared,
 
and operating
 
costs
estimated
 
by
 
MM&A.
 
MM&A
 
utilized
 
historical
 
cost
 
data
 
provided
 
by
 
Coronado
 
and
 
its
 
own
knowledge and experience to estimate direct and indirect operating
 
costs.
 
 
 
ex962p2i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
44
The
 
preliminary
 
feasibility
 
financial
 
model,
 
prepared
 
for
 
this
 
TRS,
 
was
 
developed
 
to
 
test
 
the
economic viability of
 
the coal reserve
 
area.
 
The results of
 
this financial model
 
are not intended
 
to
represent
 
a
 
bankable
 
feasibility
 
study,
 
required
 
for
 
financing
 
of
 
any
 
current
 
or
 
future
 
mining
operations,
 
but
 
are
 
intended
 
to
 
prove
 
the
 
economic
 
viability
 
of the
 
estimated
 
coal
 
reserves.
 
All
costs and prices are based on 2022 nominal United States dollars assuming a 2% inflation rate.
On
 
an
 
unlevered
 
basis,
 
the
 
NPV
 
of
 
the
 
project
 
cash
 
flows
 
after
 
taxes
 
was
 
estimated
 
for
 
the
purpose of classifying
 
coal reserves.
 
The project cash
 
flows, excluding
 
debt service, are
 
calculated
by
 
subtracting
 
direct
 
and
 
indirect
 
operating
 
expenses
 
and
 
capital
 
expenditures
 
from
 
revenue.
 
Direct
 
costs
 
include
 
labor,
 
drilling
 
and
 
blasting,
 
operating
 
supplies,
 
maintenance
 
and
 
repairs,
facilities costs
 
for materials
 
handling, coal preparation,
 
refuse disposal,
 
coal loading, sampling
 
and
analysis
 
services,
 
reclamation
 
and
 
general
 
and
 
administrative
 
costs.
 
Indirect
 
costs
 
include
statutory
 
and
 
legally
 
agreed
 
upon
 
fees
 
related
 
to
 
direct
 
extraction
 
of
 
the
 
mineral.
 
The
 
indirect
costs
 
are
 
the
 
federal
 
black
 
lung
 
tax,
 
federal
 
and
 
state
 
reclamation
 
taxes,
 
property
 
taxes,
 
local
transportation
 
prior
 
to
 
delivery
 
at
 
rail
 
or barge
 
loading
 
sites,
 
coal
 
production
 
royalties,
 
sales
 
and
use taxes,
 
income taxes
 
and state
 
severance
 
taxes.
 
Coronado’s
 
historical
 
costs
 
provided
 
a useful
reference for MM&A’s
 
cost estimates.
Sales
 
revenue
 
is
 
based
 
on
 
the
 
metallurgical
 
coal
 
price
 
information
 
provided
 
to
 
MM&A
 
by
Coronado.
Projected
 
debt
 
service
 
is
 
excluded
 
from
 
the
 
P&L
 
and
 
cash
 
flow
 
model
 
in
 
order
 
to
 
determine
Enterprise Value.
The
 
financial
 
model
 
expresses
 
coal
 
sales
 
prices,
 
operating
 
costs,
 
and
 
capital
 
expenditures
 
in
current
 
day
 
dollars
 
without adjustment
 
for
 
inflation.
 
Capital
 
expenditures
 
and
 
reclamation
 
costs
are
 
included
 
based
 
on
 
engineering
 
estimates
 
for
 
each
 
mine
 
by
 
year.
 
The
 
Coronado
 
division’s
existing allocations of administrative
 
costs are continued in the future projections.
Coronado
 
will
 
pay
 
royalties
 
for
 
the
 
various
 
current
 
and
 
projected
 
operations.
 
The
 
royalty
 
rates
vary by
 
mining method
 
and location.
 
The royalty
 
rates
 
for Buchanan
 
are estimated
 
to be
 
4.0% of
the sales revenue.
The
 
projection
 
model
 
also
 
includes
 
consolidated
 
income
 
tax
 
calculations
 
at
 
the
 
Coronado
 
level,
incorporating statutory
 
depletion calculations, as well
 
as state income
 
taxes, and a
 
federal tax rate
of
 
21%.
 
To
 
the
 
extent
 
the
 
mine
 
generates
 
net
 
operating
 
losses
 
for
 
tax
 
purposes,
 
the
 
losses
 
are
carried
 
over
 
to
 
offset
 
future
 
taxable
 
income.
 
The
 
terms
 
“cash
 
flows”
 
and
 
“project
 
cash
 
flows”
used in this report refer to after tax
 
cash flows.
Consolidated
 
cash
 
flows
 
are
 
driven
 
by
 
annual
 
sales
 
tonnage,
 
which
 
at
 
steady-state
 
level
 
ranges
from
 
a
 
peak
 
of
 
6.5
 
million
 
tonnes
 
in
 
2034
 
to
 
a
 
low
 
of
 
0.7
 
million
 
tonnes
 
in
 
2044.
 
Projected
consolidated
 
revenue
 
ranges
 
from
 
$317.8
 
million
 
to
 
$1.019
 
billion
 
at
 
a
 
steady
 
state.
 
Revenue
totals $14.2 billion for the project’s
 
life.
Consolidated
 
cash
 
flow
 
from
 
operations
 
is
 
positive
 
throughout
 
the
 
projected
 
operating
 
period,
with
 
the
 
exception
 
of
 
post-production
 
years,
 
due
 
to
 
end-of-mine
 
reclamation
 
spending.
 
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex962p53i0
the JORC Code and United States
 
SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
45
Consolidated cash flow from operations peaks
 
at $424.3 million in 2035 and totals $5.2 billion over
the project’s
 
life.
 
Capital expenditures
 
total $602.8
 
million through 2027
 
and $1.4 billion
 
over the
project’s life.
 
Coal price
 
forecasts
 
for
 
coal products
 
were prepared
 
by Coronado
 
for
 
its active
 
operations.
 
Such
prices
 
were
 
used
 
for
 
the
 
revenue
 
input
 
into
 
the
 
financial
 
model.
 
Sales
 
variable
 
costs
 
such
 
as
production royalties and severance
 
taxes were based upon the revenue
 
input.
19.2
Results
The
 
pre-feasibility
 
financial
 
model,
 
prepared
 
by
 
MM&A
 
for
 
this
 
TRS,
 
was
 
developed
 
to
 
test
 
the
economic viability of
 
each coal resource
 
area.
 
The results of
 
this financial model
 
are not intended
to represent
 
a bankable feasibility
 
study,
 
as may be
 
required for
 
financing of any
 
current or future
mining
 
operations
 
contemplated
 
but
 
are
 
intended
 
to
 
prove
 
the
 
economic
 
viability
 
of
 
the
estimated coal reserves.
 
Optimization of the LOM plan was outside the scope of the engagement.
Figure 19-1
 
shows the annual variance of cash costs per ton.
 
Table 19-1
 
shows LOM tonnage, P&L,
and EBITDA for Buchanan.
Figure 19-1:
 
Cash Costs per Tonne
As shown
 
above, the
 
Buchanan Mine’s
 
average
 
cash cost
 
ranges between
 
approximately
 
$68 and
$111 per tonne for most of the operating period.
Table 19-1:
 
Life-of-Mine Tonnage,
 
P&L before Tax,
 
and EBITDA
 
LOM
LOM
P&L
LOM
EBITDA
 
Tonnes
Pre-Tax P&L
Per Tonne
EBITDA
Per Tonne
Buchanan
92,923
$4,280,077
$46.06
$6,174,578
$66.45
As
 
shown
 
in
Table
 
19-1,
 
the
 
Buchanan
 
Mine
 
shows
 
positive
 
EBITDA
 
over
 
the
 
LOM.
 
Overall,
Coronado’s
 
consolidated
 
operations
 
show positive
 
LOM
 
P&L
 
and
 
EBITDA
 
of
 
$4.3
 
billion
 
and
 
$6.2
billion, respectively.
 
A summary of
 
the key
 
financial performance metrics
 
projected through
 
2030
is provided below in
Table 19-2
.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
46
Table 19-2:
 
Summary of Buchanan Key Financial Performance Metrics (2023-2030)
 
 
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
Remaining
 
Total
2023
2024
2025
2026
2027
2028
2029
2030
LOM Average
ROM Production Tonnes
153.6
7.4
7.5
8.8
9.5
11.1
9.4
9.4
9.2
5.8
Yield
60.48%
50.98%
50.61%
49.81%
46.98%
46.16%
66.22%
68.89%
67.70%
64.48%
Saleable Production Tonnes
92.9
3.8
3.8
4.4
4.4
5.1
6.2
6.5
6.2
3.8
 
Thermal Tonnes
-
-
-
-
-
-
-
-
-
-
Domestic & Non-Asia
Export Met Tonnes
29.9
1.2
1.2
1.4
1.4
1.6
2.0
2.1
2.0
1.2
Export Met Tonnes
63.0
2.6
2.6
3.0
3.0
3.5
4.2
4.4
4.2
2.5
 
Total Saleable Tonnes
92.9
3.8
3.8
4.4
4.4
5.1
6.2
6.5
6.2
3.8
 
Cash Costs per Tonne:
Mining Costs
$65.99
$66.53
$66.60
$64.95
$64.94
$58.16
$51.67
$50.89
$53.95
$71.83
Processing and Transport
$8.22
$20.33
$9.40
$9.03
$9.11
$8.84
$6.32
$6.20
$6.44
$7.74
Sales Related Costs
$9.48
$9.78
$8.92
$8.04
$7.64
$8.60
$8.68
$8.84
$9.01
$10.05
G&A
$2.65
$3.79
$2.89
$2.54
$2.54
$2.27
$2.32
$2.36
$2.41
$2.70
 
Total Cash Costs
$86.33
$100.43
$87.80
$84.55
$84.24
$77.88
$68.98
$68.30
$71.81
$92.31
 
EBITDA per Tonne
$66.45
$78.12
$55.04
$47.23
$48.98
$57.54
$69.15
$72.59
$71.90
$68.66
 
Expansion CapEx ($M)
$-
$-
$-
$-
$-
$-
$-
$-
$-
$-
Maintenance CapEx ($M)
$1,448.5
$135.8
$130.8
$111.9
$122.8
$101.6
$70.4
$50.2
$71.2
$46.7
 
Total CapEx
$1,448.5
$135.8
$130.8
$111.9
$122.8
$101.6
$70.4
$50.2
$71.2
$46.7
After Tax
 
Cash Flows
 
were
 
developed in
 
order to
 
calculate
 
the NPV
 
for
 
this Property.
 
The NPV
 
is
estimated
 
to be
 
$1.562 billion
 
at a
 
discount rate
 
of 10.0%.
 
A summary
 
of the
 
Buchanan after-tax
cash flow is shown in
Table 19-3
.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
47
Table 19-3:
 
Project Cash Flow Summary (000)
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
Total
2023
2024
2025
2026
2027
Production & Sales tonnes
92,924
3,786
3,811
4,363
4,446
5,112
Total Revenue
$14,194,747
$675,923
$544,435
$574,963
$592,283
$692,273
EBITDA
$6,174,578
$295,749
$209,789
$206,065
$217,757
$294,147
Net Income
$3,368,328
$179,131
$103,854
$91,899
$90,456
$138,196
Net Cash Provided by Operating Activities
$5,181,846
$188,692
$200,765
$186,416
$195,463
$245,493
Purchases of Property, Plant, and
 
Equipment
$(1,448,505)
$(135,766)
$(130,803)
$(111,896)
$(122,768)
$(101,557)
Net Cash Flow
$3,733,342
$52,926
$69,962
$74,520
$72,695
$143,936
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2028
2029
2030
2031
2032
2033
Production & Sales tonnes
6,242
6,462
6,200
5,444
6,226
4,814
Total Revenue
$862,187
$910,476
$890,951
$798,054
$930,819
$734,119
EBITDA
$431,599
$469,093
$445,727
$357,721
$458,785
$288,024
Net Income
$240,334
$262,860
$254,666
$197,893
$280,873
$159,996
Net Cash Provided by Operating Activities
$339,674
$386,828
$379,000
$320,798
$362,834
$277,786
Purchases of Property, Plant, and
 
Equipment
$(70,382)
$(50,228)
$(71,184)
$(59,572)
$(49,573)
$(65,133)
Net Cash Flow
$269,292
$336,600
$307,815
$261,226
$313,262
$212,653
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2034
2035
2036
2037
2038
2039
Production & Sales tonnes
6,474
6,423
5,249
3,447
3,009
2,914
Total Revenue
$1,007,101
$1,019,070
$849,433
$569,043
$506,626
$500,552
EBITDA
$501,730
$526,779
$424,763
$211,060
$168,369
$216,035
Net Income
$326,060
$344,381
$266,105
$105,424
$79,886
$116,181
Net Cash Provided by Operating Activities
$372,442
$424,330
$368,367
$223,842
$158,704
$177,921
Purchases of Property, Plant, and
 
Equipment
$(54,007)
$(69,272)
$(64,919)
$(77,383)
$(43,070)
$(35,719)
Net Cash Flow
$318,435
$355,058
$303,449
$146,459
$115,634
$142,202
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2040
2041
2042
2043
2044
2045
Production & Sales tonnes
2,093
2,254
1,703
1,714
737
-
Total Revenue
$366,649
$402,822
$309,918
$317,808
$139,240
$-
EBITDA
$108,191
$153,415
$80,892
$106,596
$2,291
$-
Net Income
$34,854
$71,326
$19,002
$46,332
$(34,676)
$(3,773)
Net Cash Provided by Operating Activities
$119,167
$128,269
$89,128
$92,258
$24,650
$(47,861)
Purchases of Property, Plant, and
 
Equipment
$(50,131)
$(46,604)
$(24,930)
$(13,606)
$-
$-
Net Cash Flow
$69,036
$81,665
$64,198
$78,652
$24,650
$(47,861)
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2046
2047
2048
2049
2050
2051
Production & Sales tonnes
-
-
-
-
-
-
Total Revenue
$-
$-
$-
$-
$-
$-
EBITDA
$-
$-
$-
$-
$-
$-
Net Income
$(1,534)
$(785)
$(403)
$(209)
$(0)
$(0)
Net Cash Provided by Operating Activities
$(16,273)
$(8,299)
$(4,232)
$(4,317)
$-
$-
Purchases of Property, Plant, and
 
Equipment
$-
$-
$-
$-
$-
$-
Net Cash Flow
$(16,273)
$(8,299)
$(4,232)
$(4,317)
$-
$-
19.3
Sensitivity
Sensitivity
 
of the
 
NPV
 
results
 
to
 
changes
 
in
 
the
 
key
 
drivers
 
is presented
 
in the
 
chart below.
 
The
sensitivity study shows
 
the NPV at
 
the 10.0% discount rate
 
when Base Case sales
 
prices, operating
costs, and capital costs are increased and decreased in increments
 
of 5% within a +/- 15% range.
 
 
ex962p2i0
 
 
ex962p17i0
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
48
Figure 19-2:
 
Sensitivity of NPV
As
 
shown,
 
NPV
 
is
 
quite
 
sensitive
 
to
 
changes
 
in
 
sales
 
price
 
and
 
operating
 
cost
 
estimates,
 
and
slightly sensitive to changes in capital cost estimates.
20
Adjacent Properties
20.1
Information Used
No proprietary information associated with neighboring properties was
 
used as part of this study.
21
Other Relevant Data and Information
MM&A performed
 
a previous
 
audit of
 
all the
 
properties
 
in year
 
2017 for
 
Coronado
 
based on
 
SEC
Industry
 
Guide 7
 
standards.
 
In addition,
 
MM&A completed
 
a Limited
 
Phase I
 
Environmental
 
Site
Assessment
 
(
ESA
)
 
on
 
the
 
Property
 
in
 
2016
 
on
 
behalf
 
of
 
Coronado.
 
MM&A
 
has
 
subsequently
conducted
 
Joint
 
Ore
 
Reserve
 
Committee
 
(
JORC
)
 
compliant
 
resource
 
and
 
reserve
 
assessments
 
of
the Buchanan
 
assets as
 
of: (1)
 
December 31,
 
2017, (2)
 
December 31,
 
2020, and
 
(3) December
 
31,
2021.
 
By
 
assignment,
 
the
 
JORC
 
assessment
 
included
 
a
 
preliminary
 
feasibility
 
level
 
study
 
of
 
the
subject coal reserves, encompassing detailed
 
mine planning and cost analysis through
 
depletion of
Buchanan’s
 
JORC-compliant
 
coal
 
reserves.
 
MM&A
 
utilized
 
these
 
former
 
preliminary
 
feasibility
studies as the basis of an updated study which meets those standards set forth by
 
the SEC.
 
 
ex962p2i0
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
49
22
Interpretation and Conclusions
22.1
Conclusion
Sufficient
 
data
 
have
 
been
 
obtained
 
through
 
various
 
exploration
 
and
 
sampling
 
programs
 
and
mining
 
operations
 
to
 
support
 
the
 
geological
 
interpretations
 
of
 
seam
 
structure
 
and
 
thickness
 
for
coal
 
horizons
 
situated
 
on
 
the
 
Property.
 
The
 
data
 
are
 
of
 
sufficient
 
quantity
 
and
 
reliability
 
to
reasonably support the coal resource and coal reserve estimates
 
in this TRS.
The
 
geological
 
data
 
and
 
preliminary
 
feasibility
 
study,
 
which
 
consider
 
mining
 
plans,
 
revenue,
 
and
operating
 
and
 
capital
 
cost
 
estimates
 
are
 
sufficient
 
to
 
support
 
the
 
classification
 
of
 
coal
 
reserves
provided herein.
This
 
geologic
 
evaluation
 
conducted
 
in
 
conjunction
 
with
 
the
 
preliminary
 
feasibility
 
study
 
is
sufficient to
 
conclude that
 
the 92.9 Mt
 
of marketable
 
underground coal
 
reserves identified
 
on the
Property
 
are
 
economically
 
mineable
 
under
 
reasonable
 
expectations
 
of
 
market
 
prices
 
for
metallurgical coal products, estimated
 
operation costs, and capital expenditures.
22.2
Risk Factors
Risks have
 
been identified
 
for
 
operational,
 
technical and
 
administrative
 
subjects addressed
 
in the
Pre-Feasibility
 
Study.
 
A risk
 
matrix has
 
been constructed
 
to present
 
the risk
 
levels for
 
all the
 
risk
factors
 
identified
 
and
 
quantified
 
in
 
the
 
risk
 
assessment
 
process.
 
The
 
risk
 
matrix
 
and
 
risk
assessment
 
process
 
are modelled
 
according
 
to
 
the Australian
 
and New
 
Zealand
 
Standard
 
on Risk
Management (AS/NZS 4360).
 
The
 
purpose
 
of
 
the
 
characterization
 
of
 
the
 
project
 
risk
 
components
 
is
 
to
 
inform
 
the
 
project
stakeholders
 
of
 
key
 
aspects
 
of
 
the
 
Coronado
 
projects
 
that
 
can
 
be
 
impacted
 
by
 
events
 
whose
consequences can affect
 
the success of the venture.
 
The significance of an impacted
 
aspect of the
operation
 
is
 
directly
 
related
 
to
 
both
 
the
 
probability
 
of
 
occurrence
 
and
 
the
 
severity
 
of
 
the
consequences.
 
The initial risk for
 
a risk factor
 
is herein defined
 
as the risk level
 
after the potential
impact
 
of
 
the
 
risk
 
factor
 
is
 
addressed
 
by
 
competent
 
and
 
prudent
 
management
 
utilizing
 
control
measures
 
readily
 
available.
 
Residual
 
risk
 
for
 
a
 
risk
 
factor
 
is
 
herein
 
defined
 
as
 
the
 
risk
 
level
following application of
 
special mitigation measures if
 
management determines that the
 
initial risk
level
 
is
 
unacceptable.
 
Initial
 
risk
 
and
 
residual
 
risk
 
can
 
be
 
quantified
 
numerically,
 
derived
 
by
 
the
product of values
 
assigned to probability
 
and consequence ranging
 
from very low
 
risk to very
 
high
risk.
 
The
 
probability
 
and
 
consequence
 
parameters
 
are
 
subjective
 
numerical
 
estimates
 
made
 
by
practiced mine engineers
 
and managers.
 
Both are assigned values
 
from 1 to
 
5 for which
 
the value
1 represents the
 
lowest probability
 
and least consequence,
 
and the value 5
 
represents the highest
probability
 
and
 
greatest
 
consequence.
 
The
 
products,
 
which
 
define
 
the
 
Risk
 
Level,
 
are
 
classified
from very low to very high.
 
 
 
ex962p58i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
50
Risk Level Table
 
(R = P x C)
Risk Level (R)
Very Low (1 to 2)
Low (3 to 5)
Moderate (6 to 11)
High (12 to 19)
Very High (20 to 25)
Risk aspects
 
identified and
 
evaluated
 
during this
 
assignment total
 
12.
 
No residual
 
risks are
 
rated
Very
 
High.
 
One
 
(1)
 
residual
 
risk
 
is
 
rated
 
High.
 
Seven
 
(7)
 
of
 
the
 
risk
 
aspects
 
could
 
be
 
associated
with Moderate
 
residual risk.
 
Four (4) of
 
the risk aspects were
 
attributed Low
 
or Very
 
Low residual
risks.
 
22.2.1
Governing Assumptions
The listing of the aspects is
 
not presumed to be exhaustive.
 
Instead that listing is
 
presented based
on the experiences of the contributors to the TRS.
 
1.
The probability and consequence ratings are subjectively assigned, and it is assumed that
this subjectivity reasonably reflects the condition of the active and projected mine
operations.
2.
The Control Measures shown in the matrices presented in this chapter
 
are not exhaustive.
 
They represent a condensed collection of activities that the author of the risk assessment
section has observed to be effective in coal mining scenarios.
 
3.
Mitigation Measures listed for each
 
risk factor of the operation are not exhaustive.
 
The
measures listed, however,
 
have been observed by the author to be effective.
 
4.
The monetary values used in ranking the consequences are generally-accepted quantities
 
for
the coal mining industry.
22.2.2
Limitations
The
 
risk
 
assessment
 
proposed
 
in
 
this
 
report
 
is
 
subject
 
to
 
the
 
limitations
 
of
 
the
 
information
currently collected, tested, and interpreted
 
at the time of the writing of this report.
22.2.3
Methodology
The
 
numerical
 
quantities
 
(i.e.,
 
risk
 
levels)
 
attributable
 
to
 
either
 
“initial”
 
or
 
“residual”
 
risks
 
are
derived
 
by the
 
product
 
of values
 
assigned to
 
probability
 
and consequence
 
ranging
 
from
 
very low
risk to very high risk.
R = P x C
Where:
R = Risk Level
P = Probability of Occurrence
C = Consequence of Occurrence
The
 
Probability
 
(P)
 
and
 
Consequence
 
(C)
 
parameters
 
recited
 
in
 
the
 
formula
 
are
 
subjective
numerical estimates
 
made by practiced
 
mine engineers and
 
managers.
 
Both P and
 
C are assigned
integer
 
values
 
ranging
 
from
 
1
 
to
 
5
 
for
 
which
 
the
 
value
 
1
 
represents
 
the
 
lowest
 
probability
 
and
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
51
least consequence,
 
and the
 
value 5
 
represents
 
the highest
 
probability and
 
greatest
 
consequence.
 
The products (R = P
 
x C) which define the Risk Level,
 
are thereafter classified
 
from very low to
 
very
high.
Risk Level Table
Risk Level (R)
Very Low (1 to 2)
Low (3 to 5)
Moderate (6 to 11)
High (12 to 19)
Very High (20 to 25)
Very
 
high
 
initial
 
risks
 
are
 
considered
 
to
 
be
 
unacceptable
 
and
 
require
 
corrective
 
action
 
well
 
in
advance
 
of
 
project
 
development.
 
In
 
short,
 
measures
 
must
 
be
 
applied to
 
reduce
 
very
 
high
 
initial
risks to a tolerable level.
 
As
 
shown
 
and
 
discussed
 
above,
 
after
 
taking
 
into
 
account
 
the
 
operational,
 
technical,
 
and
administrative
 
actions
 
that
 
have
 
been
 
applied
 
or
 
are
 
available
 
for
 
action
 
when
 
required,
 
the
residual
 
risk can
 
be determined.
 
The
 
residual
 
risk provides
 
a basis
 
for
 
the
 
management
 
team
 
to
determine
 
if the
 
residual risk
 
level is
 
acceptable or
 
tolerable.
 
If the
 
risk level
 
is determined
 
to be
unacceptable,
 
further
 
actions
 
should
 
be
 
considered
 
to
 
reduce
 
the
 
residual
 
risk
 
to
 
acceptable
 
or
tolerable levels to provide justificati
 
on for continuation of the proposed operation.
22.2.4
Development of the Risk Matrix
Risks have
 
been identified for
 
the technical,
 
operational, and
 
administrative
 
subjects addressed
 
in
the TRS.
 
The risk matrix and risk assessment process
 
are modelled according to the Australian
 
and
New Zealand Standard on Risk Management (AS/NZS 4360).
 
22.2.4.1
Probability Level Table
Table 22-1:
 
Probability Level Table
Category
Probability Level (P)
1
Remote
Not likely to occur except
 
in exceptional circumstances.
<10%
2
Unlikely
Not likely to occur; small in degree.
10 - 30%
3
Possible
Capable of occurring.
30 - 60%
4
Likely
High chance of occurring in most circumstances.
60 - 90%
5
Almost Certain
Event is expected under
 
most circumstances; impossible to
 
avoid.
>90%
The
 
lowest
 
rated
 
probability
 
of
 
occurrence
 
is
 
assigned
 
the
 
value
 
of
 
1
 
and
 
described
 
as
 
remote,
with
 
a
 
likelihood
 
of
 
occurrence
 
of
 
less
 
than
 
2
 
percent.
 
Increasing
 
values
 
are
 
assigned
 
to
 
each
higher probability
 
of occurrence,
 
culminating with
 
the value
 
of 5
 
assigned to
 
incidents considered
to be almost certain to occur.
22.2.4.2
Consequence Level Table
Table 22-2
 
lists the consequence levels.
 
 
 
ex962p58i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
52
Table 22-2:
 
Consequence Level Table
Correlation of Events in Key Elements of the Project Program
 
to Event Severity Category
Category
Severity of
the Event
Financial Impact
of the Event
Unplanned
Loss of
Production
(Impact on
Commercial
Operations)
Events Impacting
on the Environment
Events Affecting the Program's
Social and Community
Relations
Resultant Regulatory /
Sovereign Risk
Events Affecting Occupational Health &
Safety
1
Insignificant
< USD $0.5
million
≤ 12 hours
Insignificant loss of
habitat; no
irreversible effects
on water,
 
soil and
the environment.
Occasional nuisance impact on
travel.
-
 
Event recurrence avoided by corrective
action through established procedures
(Engineering, guarding, training).
2
Minor
USD $0.5 million
to $2.0 million
≤ 1 day
No significant
change to species
populations; short-
term reversible
perturbation to
ecosystem function.
Persistent nuisance impact on
travel.
 
Transient adverse media
coverage.
-
 
First aid – lost time.
 
Event recurrence
avoided by corrective action through
established procedures.
3
Moderate
USD $2.0 million
to $10.0 million
≤ 1 week
Appreciable change
to species
population;
medium-term (≤10
years) detriment to
ecosystem function.
Measurable impact on travel
and water/air quality.
 
Significant adverse media
coverage / transient public
outrage.
Uncertainty securing or
retaining essential
approval / license.
Medical Treatment –
permanent
incapacitation.
 
Avoiding event
recurrence requires modification to
established corrective action procedures
.
Change to regulations
(tax; bonds; standards).
4
Major
USD $10.0
million to $50.0
million
1 to 2 weeks
Change to species
population
threatening
viability; long-term
(>10 years)
detriment to
ecosystem function.
Long-term, serious impact on
travel and use of water
resources; degradation of air
quality; sustained and effective
public opposition.
Suspension / long-delay
in securing essential
approval / license.
Fatality.
 
Avoiding event recurrence
requires modification to established
corrective action procedures and staff
retraining.
Change to laws (tax;
bonds; standards).
5
Critical
>USD $50.0
million
>1 month
Species extinction;
irreversible damage
to ecosystem
function.
Loss of social license.
Withdraw / failure to
secure essential
approval / license.
Multiple fatalities.
 
Avoiding event
recurrence requires major overhaul of
policies and procedures.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
53
The lowest
 
rated consequence
 
is assigned the
 
value of
 
1 and is
 
described as an
 
Insignificant
Consequence,
 
parameters
 
of
 
which
 
include
 
non-reportable
 
safety
 
incidents
 
with
 
zero
 
days
lost
 
accidents,
 
no
 
environmental
 
damage,
 
loss
 
of
 
production
 
or
 
systems
 
for
 
less
 
than
 
one
week and
 
cost of
 
less than
 
USD $0.5
 
million.
 
Increasing values
 
are assigned
 
to each
 
higher
consequence,
 
culminating
 
with
 
the
 
value
 
of
 
5
 
assigned
 
to
 
critical
 
consequences,
 
the
parameters
 
of which
 
include multiple-fatality
 
accidents,
 
major environmental
 
damage, and
loss of production or systems
 
for longer than one month
 
and cost of greater
 
than USD $50.0
million.
Composite Risk Matrix R = P x C and Color-Code Convention
The risk
 
level, defined
 
as the product
 
of probability
 
of occurrence
 
and consequence,
 
ranges
in value from 1 (lowest
 
possible risk) to 25 (maximum risk level).
 
The values are color-coded
to facilitate identification
 
of the highest risk aspects.
Table 22-3:
 
Risk Matrix
P x C = R
Consequence (C)
Insignificant
Minor
Moderate
Major
Critical
1
2
3
4
5
Probability Level (P)
Remote
1
1
2
3
4
5
Unlikely
2
2
4
6
8
10
Possible
3
3
6
9
12
15
Likely
4
4
8
12
16
20
Almost
Certain
5
5
10
15
20
25
22.2.5
Categorization of Risk Levels and Color Code Convention
Very
 
high
 
risks
 
are
 
considered
 
to
 
be
 
unacceptable
 
and
 
require
 
corrective
 
action.
 
Risk
reduction measures must be applied to reduce very high risks to a tolerable level.
22.2.6
Description of the Coal Property
The
 
Buchanan
 
Mine
 
Complex
 
is
 
located
 
in
 
Buchanan
 
and
 
Tazewell
 
Counties,
 
Virginia
 
and
operates
 
a
 
longwall
 
section
 
with
 
supporting
 
continuous
 
mining
 
sections.
 
Operations
 
are
projected to continue in the present mode until reserves
 
are depleted in 2044.
22.2.7
Summary of Residual Risk Ratings
Each
 
risk
 
factor
 
is
 
numbered,
 
and
 
a
 
risk
 
level
 
for
 
each
 
is
 
determined
 
by
 
multiplying
 
the
assigned
 
probability
 
by
 
the
 
assigned
 
consequence.
 
The
 
risk
 
levels
 
are
 
plotted
 
on
 
a
 
risk
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
54
matrix
 
to
 
provide
 
a
 
composite
 
view
 
of
 
the
 
Coronado
 
risk
 
profile.
 
The
 
average
 
risk
 
level
 
is
7.1, which is defined as Moderate.
Table 22-4:
 
Risk Assessment Matrix
 
 
 
 
 
 
 
 
 
Consequence
Critical
>$50 MM
8,9
 
 
 
 
 
Major
$10-50MM
 
 
 
6
 
 
Moderate
$2-10 MM
11
1,2,4
3
 
 
 
Minor
$0.5-$2 MM
 
 
12
5
7
 
Low
<$0.5 MM
 
 
10
 
 
 
 
<10%
10-30%
30-60%
60-90%
>90%
 
Remote
Unlikely
Possible
Likely
Almost
Certain
22.2.8
Risk Factors
A high-level
 
approach is
 
utilized to
 
characterize
 
risk factors
 
that are
 
generally similar
 
across
a
 
number of
 
the
 
active and
 
proposed
 
mining operations.
 
Risk factors
 
that
 
are
 
unique to
 
a
specific operation or are particularly noteworthy are
 
addressed individually.
22.2.8.1
Geological and Coal Resource
Coal
 
mining
 
is
 
accompanied
 
by
 
risk
 
that,
 
despite
 
exploration
 
efforts,
 
mining
 
areas
 
will
 
be
encountered
 
where
 
geological
 
conditions
 
render
 
extraction
 
of
 
the
 
resource
 
to
 
be
uneconomic,
 
or
 
that
 
coal
 
quality
 
characteristics
 
disqualify
 
the
 
product
 
for
 
sale
 
into
 
target
markets.
Offsetting
 
the
 
geological
 
and
 
coal
 
resource
 
risks
 
are
 
the
 
massive
 
size
 
of
 
the
 
controlled
property which allows
 
large areas to
 
be mined in
 
the preferred
 
mine areas sufficiently
 
away
from
 
areas
 
where
 
coal
 
quality
 
and
 
mineability
 
may
 
be
 
less
 
favorable.
 
This
 
flexibility,
combined with the
 
extensive work
 
done to define the
 
reserve, reduces the
 
risk at Buchanan
below that of other mine properties.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
55
Table 22-5:
 
Geological and Coal Resource Risk Assessment (Risks 1 and 2)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation Measures
Residual Risk Level
P
C
R
P
C
R
Recoverable coal
tonnes recognized to
be significantly less
than previously
estimated.
Reserve base is adequate
to serve market
commitments and respond
to opportunities for many
years.
 
Local adverse
conditions may increase
frequency and cost of
production unit relocations.
Previous and ongoing
exploration and extensive
regional mining history
provide a high level of
confidence of coal seam
correlation, continuity of
the coal seams, and coal
resource tonnes.
3
4
12
Optimize mine plan
to increase resource
recovery; develop
mine plan to provide
readily available
alternate mining
locations to sustain
expected production
level.
2
3
6
Coal quality locally
proves to be lower
than initially
projected.
If uncontrolled, production
and sale of coal that is out
of specification can result in
rejection of deliveries,
cancellation of coal sales
agreements and damage to
reputation.
Exploration and vast
experience and history in
local coal seams provide
confidence in coal
quality; limited excursions
can be managed with
careful product
segregation and
blending.
2
5
10
Develop mine plan to
provide readily
available alternate
mining locations to
sustain expected
production level;
modify coal sales
agreements to reflect
coal quality.
2
4
8
22.2.8.2
Environmental
MM&A completed a Limited Phase I Environmental
 
Site Assessment (
ESA
) on the Property in
April 2016
 
on behalf of
 
Coronado.
 
MM&A concluded
 
that no
 
long-term liabilities
 
existed at
the time of this ESA.
Water
 
quality and
 
other permit
 
requirements are
 
subject to
 
modification and
 
such changes
could have
 
a material
 
impact on
 
the capability
 
of the
 
operator
 
to meet
 
modified standards
or to receive
 
new permits and modifications
 
to existing permits.
 
Permit protests
 
may result
in delays or denials to permit applications.
Environmental
 
standards
 
and permit
 
requirements
 
have
 
evolved
 
significantly
 
over the
 
past
50
 
years
 
and
 
to
 
date,
 
mining
 
operators
 
and
 
regulatory
 
bodies
 
have
 
been
 
able
 
to
 
adapt
successfully to evolving environmental
 
requirements.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
56
Table 22-6:
 
Environmental (Risks 3 and 4)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation Measures
Residual Risk
Level
P
C
R
P
C
R
Environmental
performance standards
are modified in the
future.
Delays in receiving new
permits and modifications to
existing permits; cost of
testing and treatment of
water and soils
Work with regulatory
agencies to understand and
influence final standards;
implement testing,
treatment and other actions
to comply with new
standards.
3
4
12
Modify mining and
reclamation plans to
improve compliance with
new standards while
reducing cost of compliance.
3
3
9
New permits and
permit modifications
are increasingly
delayed or denied.
Interruption of production and
delayed implementation of
replacement production from
new mining areas.
Comply quickly with testing,
treatment and other actions
required; continue excellent
compliance performance
within existing permits.
2
4
8
Establish and maintain close
and constructive working
relationships with regulatory
agencies, local communities
and community action
groups.
 
Prepare and submit
permits well in advance of
needs.
 
2
3
6
22.2.8.3
Regulatory Requirements
Federal
 
and state
 
health and
 
safety
 
regulatory
 
agencies occasionally
 
amend mine
 
laws
 
and
regulations.
 
The
 
impact
 
is
 
industry-wide.
 
Mining
 
operators
 
and
 
regulatory
 
agencies
 
have
been able to adapt successfully to evolving health and safety requirements.
Table 22-7:
 
Regulatory Requirements (Risk 5)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Federal and state mine
safety and health
regulatory agencies
amend mine laws and
regulations.
Cost of training, materials,
supplies and equipment;
modification of mine
examination and production
procedures; modification of
mining plans.
Participate in hearings and
workshops when possible
to facilitate understanding
and implementation; work
cooperatively with agencies
and employees to facilitate
implementation of new laws
and regulations.
4
3
12
Familiarity and
experience with new
laws and regulations
results in reduced
impact to operations
and productivity and
improved supplies
and equipment
options.
4
2
8
22.2.8.4
Market and Transportation
Most
 
of
 
the
 
current
 
and
 
future
 
production
 
is
 
expected
 
to
 
be
 
directed
 
to
 
domestic
 
and
international
 
metallurgical
 
markets.
 
Historically
 
the
 
metallurgical
 
markets
 
have
 
been
cyclical and highly volatile.
 
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
57
Table 22-8:
 
Market and Transportation (Risk 6)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Volatile coal prices drop
precipitously.
Loss of revenue adversely
affects profitability; reduced
cash flow may disrupt capital
expenditures plan.
Cost control measures
implemented; capital
spending deferred.
4
5
20
High-cost operations
closed, and
employees
temporarily
furloughed.
4
4
16
Occasional
 
delay
 
or
 
interruption
 
of
 
rail,
 
river
 
and
 
terminals
 
service
 
may
 
be
 
expected.
 
The
operator
 
can
 
possibly
 
minimize
 
the
 
impact
 
of
 
delays
 
by
 
being
 
a
 
preferred
 
customer
 
by
fulfilling shipment obligations promptly and maintaining close working relationships.
Table 22-9:
 
Market and Transportation (Risk 7)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Rail or river transport is
delayed; storage and
shipping access at river
and ocean terminals is
not available.
Fulfillment of coal sales
agreements delayed; limited
coal storage at mines may
increase cost of rehandling;
production may be temporarily
idled.
Provide adequate storage
capacity at mines;
coordinate continuously
with railroad and shipping
companies to respond
quickly and effectively to
changing circumstances.
5
3
15
Provide back-up
storage facility along
with personnel,
equipment and
rehandle plan to
sustain production
and fulfill sales
obligations timely.
5
2
10
22.2.8.5
Mining Plan
Occupational
 
health
 
and
 
safety
 
risks
 
are
 
inherent
 
in
 
mining
 
operations.
 
Comprehensive
training
 
and
 
retraining
 
programs,
 
internal
 
safety
 
audits
 
and
 
examinations,
 
regular
 
mine
inspections,
 
safety
 
meetings,
 
along
 
with
 
support
 
of
 
trained
 
fire
 
brigades
 
and
 
mine-rescue
teams are
 
among activities
 
that greatly
 
reduce accident
 
risks.
 
Employee health-monitoring
programs
 
coupled
 
with
 
dust
 
and
 
noise
 
monitoring
 
and
 
abatement
 
reduce
 
health
 
risks
 
to
miners.
 
As
 
underground
 
mines
 
are
 
developed
 
and
 
extended,
 
observation
 
of
 
geological,
hydrogeological
 
and
 
geotechnical
 
conditions
 
leads
 
to
 
modification
 
of
 
mine
 
plans
 
and
procedures to enable safe work within the mine environments.
Highlighted
 
below
 
are
 
selected
 
examples
 
of
 
safety
 
and
 
external
 
factors
 
relevant
 
to
Coronado operations.
22.2.8.5.1
Methane Management
Coalbed
 
methane
 
is
 
present
 
in
 
coal
 
operations
 
below
 
drainage.
 
Often
 
the
 
methane
concentration in shallow coal
 
seams is at such low levels that
 
it can be readily managed with
frequent testing and monitoring, vigilance, and routine mine ventilation.
 
Very high methane
concentrations
 
may
 
be
 
present
 
at
 
greater
 
depths,
 
as
 
experienced
 
in
 
the
 
Pocahontas
 
No.
 
3
seam
 
at
 
Buchanan
 
Mine
 
Complex
 
in
 
Virginia.
 
High
 
methane
 
concentrations
 
may
 
require
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
58
degasification
 
of
 
the
 
coal
 
seam
 
to
 
assure
 
safe
 
mining.
 
The
 
Buchanan
 
Mine
 
has
 
operated
safely for many years
 
in one of the most intense methane environments
 
in the United States
through
 
careful
 
management
 
of
 
coal
 
seam
 
degasification,
 
gob
 
degasification
 
and
 
mine-
ventilation procedures.
Table 22-10:
 
Methane Management (Risk 8)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Methane hazard is
present in mines
operating below
drainage.
Injury or loss of life; possible
ignition of gas and mine
explosion; potential loss of
mine and equipment
temporarily or permanently;
additional mine fan, mine
power, ventilation, monitoring
and examination
requirements.
Low to moderate levels can
be managed with frequent
examinations, testing and
monitoring within the mine
ventilation system.
 
Excellent rock dust
maintenance minimizes
explosion propagation risk
should an ignition occur.
1
5
5
Very high-level
methane
concentrations may
require coal seam
degasification and
gob degasification if
longwall or pillar
extraction methods
are employed.
1
5
5
22.2.8.5.2
Mine Fires
Mine fires,
 
once common at
 
mine operations,
 
are rare
 
today.
 
Most active
 
coal miners
 
have
not
 
encountered
 
a
 
mine
 
fire.
 
Vastly
 
improved
 
mine
 
power
 
and
 
equipment
 
electrical
systems,
 
along
 
with
 
safe
 
mine
 
practices,
 
reduce
 
mine
 
fire
 
risks.
 
Crew
 
training
 
and
 
fire
brigade support
 
and training
 
improve response
 
for containment
 
and control
 
if a
 
fire occurs.
 
Spontaneous
 
combustion
 
within
 
coal
 
mines,
 
which
 
is
 
the
 
source
 
of
 
most
 
fires
 
that
 
occur
today,
 
is not expected to occur at Buchanan.
 
Table 22-11:
 
Mine Fires (Risk 9)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation Measures
Residual Risk Level
P
C
R
P
C
R
Mine fire at underground
or surface mine
operation.
Injury or loss of life;
potential loss of mine
temporarily or
permanently; damage to
equipment and mine
infrastructure.
Inspection and
maintenance of mine
power, equipment and
mine infrastructure; good
housekeeping; frequent
examination of conveyor
belt entries; prompt
removal of accumulations
of combustible materials.
1
5
5
If spontaneous
combustion conditions
are present, enhanced
monitoring and
examination procedures
will be implemented;
mine design will
incorporate features to
facilitate isolation,
containment and
extinguishment of
spontaneous
combustion locations.
1
5
5
22.2.8.5.3
Availability of Supplies and Equipment
The
 
industry
 
has
 
periodically
 
experienced
 
difficulty
 
receiving
 
timely
 
delivery
 
of
 
mine
supplies
 
and
 
equipment.
 
Availability
 
issues
 
often
 
accompanied
 
boom
 
periods
 
for
 
coal
demand.
 
Any
 
future
 
delivery
 
of
 
supplies
 
and
 
equipment
 
delays
 
are
 
expected
 
to
 
be
temporary with limited impact on production.
 
 
ex962p58i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
59
Table 22-12:
 
Availability of Supplies and Equipment (Risk 10)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Disruption of availability
for supplies and
equipment.
Temporary interruption of
production.
Force majeure provision in
coal sales agreements to
limit liability for delayed or
lost sales.
3
2
6
Work closely with
customers to assure
delayed coal
delivery rather than
cancelled sales;
monitor external
conditions and
increase inventory
of critical supplies;
accelerate delivery
of equipment when
possible.
3
1
3
22.2.8.5.4
Labor
Work
 
stoppage
 
due
 
to
 
labor
 
protests
 
are
 
considered
 
unlikely
 
and
 
are
 
accompanied
 
by
limited
 
impact should
 
it occur.
 
Excellent
 
employee relations
 
and communications
 
limit the
exposure
 
to
 
outside protesters.
 
Loss of
 
supervisors
 
and skilled
 
employees
 
to retirement
 
is
inevitable;
 
the
 
impact
 
can
 
be
 
lessened
 
with
 
succession
 
planning
 
and
 
training
 
and
mentorship of new employees.
Table 22-13:
 
Labor – Work Stoppage (Risk 11)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Work stoppage due to
strikes, slowdowns or
secondary boycott
activity.
Loss of production and coal
sales; damaged customer and
employee relations; reputation
loss.
Maintain excellent
employee relations and
communications; maintain
frequent customer
communications.
1
3
3
Develop plan for
employee
communications and
legal support to
minimize impact of
secondary boycott
activities.
1
3
3
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
the JORC Code and United States SEC Regulation S-K
 
1300 as of December 31, 2022
 
Central Appalachian Coal Basin
Virginia, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
60
Table 22-14:
 
Labor – Retirement (Risk 12)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Retirement of
supervisors and skilled
employees.
Loss of leadership and critical
skills to sustain high levels of
safety, maintenance and
productivity.
Monitor demographics
closely and maintain
communications with
employees who are
approaching retirement
age; maintain employee
selection and training
programs.
3
3
9
Maintain selection of
candidates and
implementation of in-
house or third-party
training for
electricians and
mechanics; develop
employee mentoring
program.
3
2
6
23
Recommendations
Coronado is continuing
 
to work both internally
 
and with outside assistance
 
to further define
their resource base and to optimize the LOM plan.
24
References
Publicly
 
available
 
information
 
from
 
various
 
state
 
and
 
federal
 
agencies
 
was
 
used
 
where
relevant.
25
Reliance on Information Provided by the
Registrant
A
 
summary
 
of
 
the
 
information
 
provided
 
by
 
Coronado
 
relied
 
upon
 
by
 
MM&A
 
for
 
the
purposes of this TRS is provided in
Table 25-1
.
Table
 
25-1:
 
Information from Registrant Relied Upon by MM&A
 
Category
Information Provided by Coronado
Report
Section
Marketing
Long-term price forecast used
 
in financial projections
16.2
 
Legal
Mineral control and surface
 
control rights as shown on maps
3.2, 3.3
Environmental
Permit and bonding information
17.3
ex962p69i0
 
 
 
 
 
 
APPENDIX
A
MM&A QUALIFICATIONS
ex962p70i0
 
 
ex962p71i0
 
 
 
 
 
 
APPENDIX
B
MAP
ex962p72i0
 
 
ex962p71i0
 
 
 
 
 
 
APPENDIX
C
GLOSSARY OF ITEMS
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
Glossary of Abbreviations and Definitions
Abbreviation
Definition
AIPG
American Institute of Professional Geologists
ARMPS
Analysis of Retreat Mining Pillar Stability
ASTM
ASTM International
AVS
Applicant Violator System
bcm
Bank cubic meters
Btu/lb.
British Thermal Unit per pound
CAT
®
Caterpillar Inc.
C.P.G.
Certified Professional Geologist
Carlson
Carlson Mining – formerly SurvCADD
®
 
– a prevalent software package used for
modeling in the Appalachian region
CFR
Code of Federal Regulations
CBM
Coalbed Methane
Coronado
Coronado Global Resources Inc.
CSR
Codes of State Rules
 
CSX
CSX Corporation, a rail-based freight transportation
 
company
CTR
Contour mining
Demonstrated
reserves
Demonstrated reserves are the sum of proven
 
and probable reserves.
DEP
Department of Environmental Protection
EBITDA
Earnings before Intere
 
st, Taxes,
 
Depreciation, and Amortization
 
EOM
End-of-mine reclamation
EPA
United States Environmental
 
Protection Agency
 
ESA
Limited Phase I Environmental Site Assessment
EVR
Estimated Visual Recovery
Feasibility Study
“…comprehensive technical and economic study of the selected development
option for a mineral project, which includes detailed assessments of all
applicable modifying factors together with any
 
other relevant operational
factors, and detailed financial analysis that
 
are necessary to demonstrate, at
the time of reporting, that extraction is economically viable.
 
According to the
proposed definition, the results of the study may serve as the basis for a final
decision by a proponent or financial institution to proceed with, or finance,
the development of the project. Thus, a feasibility study is more
comprehensive, with a higher degree of accuracy,
 
and yielding results with a
higher level
 
of confidence, than a pre-feasibility study.”
 
Hitachi
Hitachi Construction Machinery Co., Ltd.
HWM
Highwall mining
In situ
Its natural position; said specific of a rock, soil, or fossil when in the situation
in which was originally formed or deposited
Indicated
Resources
Indicated
 
resources
 
are
 
those
 
lying
 
between
 
0.4-kilometer
 
and
 
1.2-kilometer
radius
 
from
 
such an
 
observation
 
point
 
and reported
 
herein
 
as in-situ
 
mineral
resources.
Inferred Resources
Inferred
 
resources
 
lie
 
more
 
than
 
a
 
1.2-kilometer
 
radius
 
from
 
a
 
valid
 
point
 
of
measurement
 
but
 
less
 
than
 
4.8
 
kilometers
 
from
 
one
 
and
 
reported
 
herein
 
as
in-situ mineral resources.
JORC Code
Australasian Code for Reporting of Exploration
 
Results, Mineral Resources and
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Abbreviation
Definition
Ore Reserves
lb. SO
2
 
/ mm Btu
Pounds per sulfur dioxide per million British thermal units
LJ Hughes
LJ Hughes & Sons, Inc. - drilling Company
LOM
Life-of-mine
M&R
Maintenance and repair
M.B.A.
Master of Business Administration
Measured
Resources
Measured resources are those lying within 0.4-kilometer radius from
 
a valid
point of measurement and reported herein as in-situ mineral resources.
MINER Act
Mine Improvement and New Emergency Response Act of 2006
 
Mineral Reserve
“…the economically mineable part of a Measured and/or Indicated Mineral
Resource.
 
It includes dilution materials and allowances for losses, which occur
when the material is mined or extracted and is defined by studies at
Preliminary Feasibility or Feasibility level as appropriate that include
Modifying Factors.
 
Such studies demonstrate that, at the time of reporting,
extraction of the mineral reserve is economically viable under reasonable
investment and marketing assumptions.”
 
Mineral Resource
“…a concentration or occurrence of solid material of economic interest
 
or on
the Earth’s crust
 
in such form, grade or quality that there are reasonable
prospects for eventual economic extraction.
 
The location, quantity,
 
grade,
continuity and other geological characteristics and continuity of a Mineral
Resource are known, estimated or interpreted
 
from specific geological
evidence and knowledge, including sampling.”
 
MM&A
Marshall Miller & Associates, Inc.
Modifying Factors
“…considerations used to convert Mineral
 
Resources to Mineral Reserves.
These include, but are not restricted to, mining, processing, metallurgical,
infrastructure, economic, marketing,
 
legal, environmental compliance, plans,
negotiations, or agreements with local individuals or groups and
governmental factors.”
MRMR
Mineral Resources to Mineral Reserves
MSHA
United States Department of Labor Mine Safety and Health Administration
MSL
Mean sea level
Mt
Million metric tonnes
NAIP
National Agricultural Imagery Program
NIOSH
National Institute for Occupational Safety
 
and Health
NS
Norfolk Southern Corporation, a rail-based freight transportation
 
company
O&M
Operating and maintenance
 
OSD
Out-of-seam dilution
OSM
U.S. Office of Surface Mining Reclamation and Enforcement
P&L
Profit and loss before tax
 
P.E.
Professional Engineer
Preliminary
Feasibility Study
“…as a comprehensive study of a range of options for the technical and
economic viability of a mineral project that has advanced to a stage
 
where a
qualified person has determined (in the case of underground mining) a
preferred mining method, or in the case of surface mining) a pit configuration,
and in all cases has determined an effective method of mineral processing
 
and
an effective plan to sell the product. The study’s
 
financial analysis must have
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Abbreviation
Definition
the level of detail necessary to demonstrate, at
 
the time of reporting, that
extraction is economically viable. In addition, as noted in the proposed
definition of a pre-feasibility study,
 
while a pre-feasibility study is less
comprehensive and results in a lower confidence level than a feasibility
 
study,
a pre-
 
feasibility study is more comprehensive and results
 
in a higher
confidence level than an initial assessment.”
 
Property(ies)
Bituminous coal deposits located in Buchanan and Tazewell
 
Counties, Virginia.
 
QP
Qualified Person
Qualified Person
“…a person who is a mineral industry professional with at least
 
five years of
relevant experience in the type of mineralization and type of deposit under
consideration and in the specific type of activity that person is undertaking on
behalf of the registrant. In addition, the proposed definition requires
 
a
qualified person to be an
eligible member or licensee in good standing of a
recognized professional
 
organization at the
time the technical report is prepared.”
Rec.
Recovery
RECs
Recognized Environmental
 
Conditions
Resource Database
The Resource Database is established by the collection,
 
validation, recording,
storing and processing of data and forms the foundation
 
necessary for the
estimation of Mineral Resource and Mineral
 
Reserve.
 
A quality assurance and quality control program
 
is essential and must be
established to govern the collection of all data.
 
In reporting, a Mineral
Resource must meet the minimum requirement of “reasonable
 
prospects for
economic extraction”.
 
This will require the concurrent collection and storage
of preliminary economic, mining, metallurgical, environmental,
 
legal and
social data and other information for use in the estimation
 
of MRMR.
 
The Resource Database will include both “primary” (observation and
measurement) and “interpreted” data.
 
It is recommended that data be stored
digitally,
 
using a documented, standard format and a reliable storage
 
medium
that allows for easy and complete
 
retrieval of the data.
ROM
Run-of-mine
RPO
Recognized Professional
 
Organizations
S-K 1300
United States Securities and Exchange Commission Regulation
 
S-K 1300
Modernization of Property Disclosures
SEC
U.S. Securities and Exchange Commission
SME
Society for Mining Engineers
SMCRA
Surface Mining Control and Reclamation Act of 1977 is the primary federal
 
law
that regulates the environmental
 
effects of coal mining in the United States.
Strip Ratio
Represented by bcm of overburden to recoverable
 
coal tonnes
 
tph
tonnes per hour
 
TRS
Technical
 
Report Summary
USA
United States of America
USFW
United States Fish and Wildlife
USGS
United States Geologic Survey
 
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
Appendix C
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
Abbreviation
Definition
VALMIN Code
Australasian Code for Public Reporting of Technical
 
Assessments and
Valuations of Mineral
 
Assets
Vulcan™
Vulcan™ software is a product of Maptek™, a provider
 
of software for the
global mining industry.
ex962p78i0
 
 
APPENDIX
D
INITIAL ECONOMIC ASSESSMENT FOR RESOURCES EXCLUSIVE
OF RESERVES
ex962p79i0
 
 
ex962p71i0
 
 
 
 
 
 
APPENDIX
E
JORC TABLE 1
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling techniques
>
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation, such as
downhole gamma sondes, or handheld XRF instruments, etc.). These examples should not be
taken as limiting the broad meaning of sampling.
>
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
>
Aspects of the determination of mineralisation that are Material to the Public Report. In cases
where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce
a 30 g charge for fire assay’). In other cases, more explanation may be required, such
 
as where
there is coarse gold that has inherent sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information.
>
Most of the coal samples have been obtained from the Properties by subsurface exploration using
core drilling techniques.
 
The protocol for preparing and testing the samples has varied over time
and is not well documented for the older holes drilled on the Properties.
>
Typical USA core drilling sampling technique is for the coal core sample, once recovered from the
core barrel, to be described then wrapped in a sealed plastic sleeve and placed into a covered core
box, which is the length of the sample so that the core can be delivered to a laboratory in relatively
intact condition and with original moisture content.
>
It is reasonable to assume, given the sophistication level of the previous operators, that these
samples were generally collected and processed under industry best-practices.
 
This assumption is
based on MM&A’s familiarity with the operating companies and the companies used to perform the
analysis.
 
>
Some of the drill holes were air rotary bored and no coal core samples were collected.
 
Seam
thickness for rotary-drilled bore holes is verified by calibrated downhole gamma-density logs.
 
>
Coal samples that were deemed by MM&A geologists to be unrepresentative were not used for
statistical analysis of coal quality, as documented in the tabulations. A representative group of drill
hole samples from the Properties were then checked against the original drill laboratory reports to
verify accuracy and correctness.
 
Drilling techniques
>
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if so, by what method, etc.).
>
The Properties have been extensively explored by subsurface drilling efforts carried out by
numerous entities, most of which were completed prior to acquisition by Coronado.
 
The majority of
the drilling was accomplished using vertical continuous (diamond) coring or air rotary methods.
>
Core drilling methods utilize NX-size (5.4 centimeter) or similar-sized core cylinders to recover core
samples, which can be used to delineate geologic characteristics, and for coal quality testing and
geotechnical logging.
 
>
Data for the rotary drilled holes is mainly derived from downhole geophysical logs, which are used to
interpret coal and rock thickness and depth since logging of the drill cuttings is not reliable.
>
Geophysical logging was performed on many of the holes, either by Geological Logging Systems (a
division of MM&A), other geophysical logging contractors, and on those properties acquired from
CONSOL geophysical logging was often performed by CONSOL’s in-house logging services.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Criteria
JORC Code explanation
Commentary
Drill sample recovery
>
Method of recording and assessing core and chip sample recoveries and results assessed.
>
Measures taken to maximise sample recovery and ensure representative nature of the
samples.
>
Whether a relationship exists between sample recovery and grade and whether sample bias
may have occurred due to preferential loss/gain of fine/coarse material.
>
Where available, core recovery thickness of coal samples was reconciled with the thickness
interpreted from geophysical logs.
>
Core recovery of the older coal samples lacking geophysical logs is sometimes not well-documented:
however, when the laboratory results for such holes had anomalous values, the data was
disqualified and not used.
 
Logging
>
Whether core and chip samples have been geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical
studies.
>
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.)
photography.
>
The total length and percentage of the relevant intersections logged.
>
A wide variety of core-logging techniques exist for the properties.
 
For many of the core holes, the
primary data source is a generalized lithology description by the driller, in some cases supplemented
by a more detailed core log completed by a geologist.
 
>
The logging of core thickness and depth is quantitative.
 
With the exception of the coal seams,
logging of rock strata type is more subjective and best considered as qualitative.
Sub-sampling
techniques and sample
preparation
>
If core, whether cut or sawn and whether quarter, half or all core taken.
>
If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled wet or dry.
>
For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
>
Quality control procedures adopted for all sub-sampling stages to maximise representivity of
samples.
>
Measures taken to ensure that the sampling is representative of the in situ material collected,
including for instance results for field duplicate/second-half sampling.
>
Whether sample sizes are appropriate to the grain size of the material being sampled.
>
Typical US practice in the Appalachian Basin is that core samples for deep mineable core samples are
not sawn or subsampled (since seams are not of great thickness and the entire seam is mined and
co-mingled).
>
Oftentimes, core for surface-mineable coal seams are bench sampled separately by the various coal
and rock layers (plies).
>
MM&A has exercised diligence to use only those analyses that are representative of the coal quality
parameters for the appropriate mining type for each sample.
Quality of assay data
and laboratory tests
>
The nature, quality and appropriateness of the assaying and laboratory procedures used and
whether the technique is considered partial or total.
>
For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters used in
determining the analysis including instrument make and model, reading times, calibrations
factors applied and their derivation, etc.
>
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
>
Sample analysis was typically carried out by accredited US laboratories.
 
>
Standard procedure upon receipt of core samples by the testing laboratory is to log the depth and
thickness of the sample, then perform testing as specified by a representative of the operating
company.
 
Each sample is then analyzed in accordance with procedures defined under
ASTM
International (
ASTM
)
 
standards including, but not limited to; washability (ASTM D4371); ash (ASTM
D3174); sulfur (ASTM D4239); Btu/lb. (ASTM D5865); volatile matter (ASTM D3175); Free Swell Index
(
FSI
) (ASTM D720).
>
Geophysical tools are calibrated by the logging company and where possible, validated using a
calibration hole.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Criteria
JORC Code explanation
Commentary
Verification of
sampling and assaying
>
The verification of significant intersections by either independent or alternative company
personnel.
>
The use of twinned holes.
>
Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
>
Discuss any adjustment to assay data.
>
All coal intersection data used to generate the geologic model has been cross referenced with the
lithological and geophysical logs by MM&A.
>
Laboratory quality was adjusted from dry basis to reflect the anticipated marketable product
moisture.
>
Coal quality results were verified by spot-check with laboratory analysis sheets by MM&A before
inclusion into the geologic model and use in the resource estimate.
Location of data points
>
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.
>
Specification of the grid system used.
>
Quality and adequacy of topographic control.
>
Due to the long history of exploration by various parties on the Properties, a wide variety of survey
techniques exist for documentation of data point locations.
 
Many of the older exploration drill holes
appear to have been located by ground survey; more recently completed drill holes are often
located by high-resolution Global Positioning System (
GPS
) units.
>
Grid systems used are typically the State Plane Coordinate System pertinent to each property.
 
>
Topography is based on either the USGS topographic 7.5-minute quadrangle maps or on recent
aerial photogrammetry as necessary (subject to availability).
Data spacing and
distribution
>
Data spacing for reporting of Exploration Results.
>
Whether the data spacing and distribution is sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
>
Whether sample compositing has been applied.
>
Spacing and distribution of data point information may vary from seam to seam within each mining
area.
 
The areas estimated for coal resource and coal reserve tonnes have been limited so that the
data spacing and distribution is sufficient to establish the degree of geological continuity appropriate
for the estimation and classification of the coal tonnes.
 
>
All of the coal resource tonnes are in the measured, indicated, and inferred categories, and all of the
coal reserve tonnes are in the proved and probable categories in accordance with the JORC Code
and SEC standards.
 
Orientation of data in
relation to geological
structure
>
Whether the orientation of sampling achieves unbiased sampling of possible structures and
the extent to which this is known, considering the deposit type.
>
If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.
>
Drill holes have been vertically drilled.
 
No downhole deviation logs have been collected and it is
therefore not known if the drill holes have deviated away from vertical.
 
Based on the relatively
shallow seam depths, any deviation is expected to be insignificant and immaterial to the geologic
characterization of the Property.
>
The dip of the coal seams is relatively minor and not a material issue for representation of seam
thickness or quality.
Sample security
The measures taken to ensure sample security.
>
Sample handling procedures employed by explorationists follow typical US protocol and should be
adequate to insure sample security.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
>
MM&A has reviewed all available geological information for the Properties in developing the
geologic model.
 
Only that data deemed suitable has been used for the purpose of generating the
resource and reserve estimates.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement and
land tenure status
>
Type, reference name/number,
 
location and ownership including agreements or material
issues with third parties such as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and environmental settings.
>
The security of the tenure held at the time of reporting along with any known impediments to
obtaining a licence to operate in the area.
>
The Coronado coal resources are located within three of the United State of America: Virginia; West
Virginia; and Pennsylvania.
 
Control of these Properties is governed by many hundreds of
agreements.
>
MM&A has not carried out separate title verification for the coal properties and has not verified
leases, deeds, surveys or other property control instruments pertinent to the subject resources.
 
>
Coronado has represented to MM&A that it controls the mining rights to the coal deposits as shown
on its property maps, and MM&A has accepted these as being a true and accurate depiction of the
mineral rights controlled by Coronado.
 
The TRS assumes the properties are developed under
responsible and experienced management.
>
There are no known legal or environmental encumbrances that would impede development of the
subject coal reserves.
Exploration done by
other parties
>
Acknowledgment and appraisal of exploration by other parties.
>
The Properties have been extensively explored by subsurface drilling efforts carried out by
numerous entities, most of which were completed prior to acquisition by Coronado.
>
This exploration work was generally performed to prevailing US best practice standards and deemed
adequate for the purposes of this TRS.
 
Geology
>
Deposit type, geological setting and style of mineralisation.
>
The Coronado coal resources are located within the Northern and Central Appalachian Coal Basins.
>
The coal deposits are Carboniferous in age, being of the Pennsylvanian system.
>
Seam of economic significance typically range between 0.3 meters and 1.8 meters in thickness, with
relatively little structural deformation.
>
Regional structure is typically characterized by gently dipping strata to the northwest at less than
one percent.
Drill hole Information
>
A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
●
easting and northing of the drill hole collar
●
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole
collar
●
dip and azimuth of the hole
●
down hole length and interception depth
●
hole length.
>
If the exclusion of this information is justified on the basis that the information is not Material
and this exclusion does not detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
>
MM&A reviewed and entered all pertinent data into a digital geologic database for each Coronado
property.
 
The database consists of thousands of data records, which include drill hole and
supplemental coal seam thickness measurements from outcrop and mine exposures.
 
>
All drill holes in the database are provided with a collar elevation and the State Plane Coordinate
System easting and northing coordinate.
>
After MM&A confirmed proper coal seam thickness and correlation, the seam data was modelled
and compiled into coal resource maps.
>
The maps are provided in the TRS; however, a tabulation of the thousands of individual data records
is not practical to include.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
Criteria
JORC Code explanation
Commentary
Data aggregation
methods
>
In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum
grade truncations (e.g. cutting of high grades) and cut-off grades are usually Material and
should be stated.
>
Where aggregate intercepts incorporate short lengths of high grade results and longer lengths
of low grade results, the procedure used for such aggregation should be stated and some
typical examples of such aggregations should be shown in detail.
>
The assumptions used for any reporting of metal equivalent values should be clearly stated.
>
Where a coal seam has been bench sampled (typically for surface mining) the individual analyses for
the coal plies are normally weight-averaged to represent the total of recoverable coal.
>
Coal quality summary results have been documented in the TRS.
 
Average coal quality on a per-
seam basis is used to represent the coal resources within a given mining area.
>
Average coal quality for each Coronado complex is provided in Tables 1-1, 1-2 and 1-3 of this TRS.
 
>
No other data aggregations methods are used.
Relationship between
mineralisation widths
and intercept lengths
>
These relationships are particularly important in the reporting of Exploration Results.
>
If the geometry of the mineralisation with respect to the drill hole angle is known, its nature
should be reported.
>
If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length, true width not known’).
>
Coal thickness values from all coal intersections and down hole geophysical logs are considered to
be vertical thicknesses.
 
Seam dip of approximately 2.0 to 3.0 degrees has little effect on the vertical
thickness of the seam.
Diagrams
>
Appropriate maps and sections (with scales) and tabulations of intercepts should be included
for any significant discovery being reported These should include, but not be limited to a plan
view of drill hole collar locations and appropriate sectional views.
>
Diagrams and maps showing the coal seam intercepts are presented in the TRS.
Balanced reporting
>
Where comprehensive reporting of all Exploration Results is not practicable, representative
reporting of both low and high grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
>
All of the available, qualified exploration data has been included within the tabulations, maps, and
diagrams for this TRS.
>
Both coal thickness and quality data are deemed by MM&A to be reasonably sufficient within the
resource areas. Therefore, there is a reasonable level of confidence in the geologic interpretations
required for coal resource determination based on the available data and the techniques applied to
the data.
Other substantive
exploration data
>
Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey results;
bulk samples – size and method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential deleterious or contaminating
substances.
>
Informational material available from the U.S. Geological Survey and the respective State Surveys
was used to assist in the Resource estimate.
 
Further work
>
The nature and scale of planned further work (e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
>
Diagrams clearly highlighting the areas of possible extensions, including the main geological
interpretations and future drilling areas, provided this information is not commercially
sensitive.
>
Further work is expected to include additional exploration, geotechnical testing, coal quality
analyses, and coal property acquisition.
 
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
Section 3 Estimation and Reporting of Mineral Resources
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Database
 
integrity
>
Measures taken to ensure that data has not been corrupted by,
 
for example, transcription or
keying errors, between its initial collection and its
 
use for Mineral Resource estimation
purposes.
>
Data validation procedures used.
>
MM&A confirmed coal seam thickness and correlations in databases used for coal deposit
modelling.
 
Representative records were spot-checked for data
 
entry validation.
 
>
Geophysical logs were used wherever available to assist in confirming the seam correlation and to
verify proper seam thickness measurements and recovery of coal samples.
Site
visits
>
Comment on
 
any site
 
visits undertaken
 
by the
 
Competent Person and the outcome of those
visits.
>
If no
 
site visits
 
have been
 
undertaken indicate
 
why this
 
is the case.
>
MM&A is very familiar with the Properties and has conducted multiple site visits throughout the
years.
Geological
interpretation
>
Confidence in (or conversely,
 
the uncertainty
 
of) the geological interpretation of the mineral
deposit.
>
Nature of the data used and of any assumptions
 
made.
>
The effect,
 
if any,
 
of alternative
 
interpretations on
 
Mineral Resource estimation.
>
The use of geology in guiding
 
and controlling
 
Mineral Resource estimation.
>
The factors affecting continuity both of grade and geology.
>
Due to the relative structural simplicity of the deposits and the reasonable continuity of the tabular
coal beds, the principal geological interpretation necessary to define the geometry of the coal
deposits is the proper modeling of their thickness and elevation.
 
>
Both coal thickness and quality data are deemed by MM&A to be reasonable within the resource
areas.
 
>
Therefore, there is a reasonable level of confidence in the geologic interpretations required for coal
resource determination based on the available data and the techniques applied to the data.
Dimensions
>
The extent and variability of the Mineral Resource expressed as length (along strike or
otherwise), plan width, and depth below surface to the upper and lower limits of the Mineral
Resource.
>
The subject coal resource areas mostly exist in discreet, individual deposits of highly variable
dimensions, shapes and depth below the ground surface.
>
Such factors are best depicted in the maps contained in the TRS.
>
Details of the parameters are cited within the TRS and included in the table of Cut-off Parameters
listed in Section 11.1 of the TRS.
 
Estimation
and
modelling techniques
>
The nature and appropriateness
 
of the estimation technique(s) applied and key assumptions,
including treatment of extreme grade values, domaining, interpolation parameters and
maximum distance of extrapolation from data points. If
 
a computer assisted estimation
method was chosen include a description of computer software and parameters used.
>
The availability of check estimates, previous estimates and/or mine production records
 
and
whether the Mineral Resource estimate
 
takes
 
appropriate account
 
of such
 
data.
>
The assumptions made regarding
 
recovery of by-products.
>
Estimation of deleterious elements or other non-grade variables of economic
 
significance (e.g.
sulphur for acid mine drainage characterisation).
>
In the case of
 
block model interpolation, the
 
block size in relation to
 
the average sample
spacing and the search employed.
>
Geological data was imported into Carlson Mining
®
 
(formerly SurvCADD
®
) geological modelling
software in the form of Microsoft
®
 
Excel files incorporating, drill hole collars, seam and thickness
picks, bottom seam elevations and raw and washed coal quality. These data files were validated
prior to importing into the software.
>
Once imported, a geologic model was created.
>
The geological model was verified and reviewed.
 
>
Resources were estimated by defining seam thickness at each point of observation and by defining
resource confidence arcs around the points of observation.
>
Points of observation for Measured and Indicated confidence arcs were defined for all drill holes
that intersected the seam.
 
>
As prescribed by the common United States classification system the following distances from points
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
9
Criteria
JORC Code explanation
Commentary
>
Any assumptions behind modelling of
 
selective mining units.
>
Any assumptions about correlation
 
between variables.
>
Description of how the
 
geological interpretation was
 
used to control the resource estimates.
>
Discussion of basis for using or not
 
using grade cutting or capping.
>
The process of validation,
 
the checking process used, the comparison of
 
model data to drill
hole data, and use of reconciliation data if available.
of observation were used to define the corresponding Resource category arcs:
-
Inferred Resources – greater than 3,960 feet (1.2 kilometers) but less than 15,840 feet (4.8
kilometers)
-
Indicated Resources – 3,960 feet (1.2 kilometers)
-
Measured Resources – 1,320 feet (0.4 kilometers)
>
The use of the standards commonly used in the United States are appropriate and customary for
this resource jurisdiction and deposition type.
>
MM&A performed a geostatistical analysis test of the Coronado data sets using the Drill Hole
Spacing Analysis (
DHSA
) method.
>
Based on MM&A’s analysis, it would be possible to extend the measured, indicated and inferred
arcs slightly beyond historically accepted practices due to consistent geological settings. The QP’s
have elected not to extend arc distances, introducing a level of conservatism in the coal
classification.
Moisture
>
Whether the tonnages are estimated on a dry basis or with natural moisture, and the method
of determination of the moisture content.
>
Coal resource tonnes are presented on a dry, in-situ basis.
>
Reserve tonnes are presented on a moist basis at anticipated product moisture ranging from 4.0 to
6.0 percent. Moisture content based on historic analyses of shipped coal.
Cut-off Parameters
>
The basis of the adopted cut-off grade(s) or quality parameters applied.
>
The cut-off parameters were tailored for each of the Coronado properties to be in accordance with
mining/ processing capabilities and market conditions prevalent at each operation.
>
Examples include minimum recoverable coal thickness, acceptable ash content and wash recovery,
and manageable overburden to coal ratio for surface mineable coal.
>
Details of the parameters are cited within the TRS and included in the table of Cut-off Parameters
listed in Section 11.1 of this TRS.
>
These cut-off parameters have been developed by MM&A based on its experience with the
Coronado properties and other mining operations of the Central Appalachian coal basin.
 
This
experience includes technical and economic evaluations of numerous properties in the region for
the purposes of determining the economic viability of the subject coal reserves.
Mining factors or
assumptions
>
Assumptions made regarding possible mining methods, minimum mining dimensions and
internal (or, if applicable, external) mining dilution. It is always necessary as part of the process
of determining reasonable prospects for eventual economic extraction to consider potential
mining methods, but the assumptions made regarding mining methods and parameters when
estimating Mineral Resources may not always be rigorous. Where this is the case, this should
be reported with an explanation of the basis of the mining assumptions made.
>
Mining factors such as dilution, mining and washing recovery are variable and have been applied at
the coal deposits at each operation based on site-specific characteristics.
>
Details of the factors are cited within the TRS.
>
Factors that would typically preclude conversion of a coal resource to coal reserve include the
following: inferred resource classification; absence of coal quality; poor mine recovery; lack of
access; insufficient exploration; or uncontrolled surface property for areas of proposed for surface
mining.
 
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
10
Criteria
JORC Code explanation
Commentary
>
While such factors were used to preclude the conversion of a very limited number of coal resources
to coal reserves in this report, the extensive history of mining on the Properties would suggest that
there are reasonable prospects for eventual economic extractions of all coal resources under
favorable market conditions.
Metallurgical factors
or assumptions
>
The basis for assumptions or predictions regarding metallurgical amenability. It is always
necessary as part of the process of determining reasonable prospects for eventual economic
extraction to consider potential metallurgical methods, but the assumptions regarding
metallurgical treatment processes and parameters made when reporting Mineral Resources
may not always be rigorous. Where this is the case, this should be reported with an
explanation of the basis of the metallurgical assumptions made.
>
The products mined from coal resources controlled by Coronado can be sold into high-, mid-, and
low-volatile metallurgical coal markets because of their inherent quality characteristics.
 
>
Run-of-mine production is washed at the coal preparation plants as needed for quality control.
 
>
Coronado may blend production from multiple sources to manage ash and sulfur content along with
the rheological and petrographic characteristics of the shipped products.
 
Environmental factors
or assumptions
>
Assumptions made regarding possible waste and process residue disposal options. It is always
necessary as part of the process of determining reasonable prospects for eventual economic
extraction to consider the potential environmental impacts of the mining and processing
operation.
 
While at this stage the determination of potential environmental impacts,
particularly for a greenfields project, may not always be well advanced, the status of early
consideration of these potential environmental impacts should be reported. Where these
aspects have not been considered this should be reported with an explanation of the
environmental assumptions made.
>
MM&A completed a Limited Phase I Environmental Site Assessment (ESA) on the Buchanan property
in April 2016, and on the Logan County and Greenbrier Properties in May 2017 on behalf of
Coronado.
 
Coronado reports not having conducted such a study since the MM&A studies.
 
>
The ESAs completed by MM&A included a site inspection, review of historical records, a database
search of State and Federal regulatory records and interviews to identify potential recognized
environmental conditions (RECs) that may create environmental liability for the sites.
 
>
MM&A identified one REC at Greenbrier associated with stained soil and gravel near a fueling and
maintenance area.
 
Coronado reported to MM&A that satisfactory clean-up efforts were completed
at Greenbrier.
 
>
Based on these former ESAs completed by MM&A, it is MM&A’s opinion that Coronado has a
generally typical coal industry record of compliance with applicable mining, water quality, and
environmental laws.
 
Estimated costs for mine closure, including water quality monitoring during
site reclamation, are included in the TRS financial models.
 
Bulk density
>
Whether assumed or determined. If assumed, the basis for the assumptions. If determined,
the method used, whether wet or dry, the frequency of the measurements, the nature, size
and representativeness of the samples.
>
The bulk density for bulk material must have been measured by methods that adequately
account for void spaces (vugs, porosity, etc), moisture and differences between rock and
alteration zones within the deposit.
>
Discuss assumptions for bulk density estimates used in the evaluation process of the different
materials.
>
Laboratory derived seam densities measured in specific gravity were used where available.
 
As
needed, these data were supplemented by estimated seam density values based on the relative
proportion of coal and non-coal material within the seam (typically at 1.30 and 2.25 specific gravity,
respectively).
>
Average seam density was determined for each coal deposit and used to convert coal volumes into
coal tonnage estimates.
Classification
>
The basis for the classification of the Mineral Resources into varying confidence categories.
>
Whether appropriate account has been taken of all relevant factors (i.e. relative confidence in
tonnage/grade estimations, reliability of input data, confidence in continuity of geology and
metal values, quality, quantity and distribution of the data).
>
Whether the result appropriately reflects the Competent
>
The Resource has been classified based on suitable distances from points of observations prescribed
in the common United States classification system.
>
The use of the United States standards is appropriate and customary for this resource jurisdiction
and deposition type.
>
MM&A performed a geostatistical analysis test of the Coronado data sets using the Drill Hole
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
11
Criteria
JORC Code explanation
Commentary
>
Person’s view of the deposit.
Spacing Analysis (
DHSA
) method.
>
Based on MM&A’s analysis, it would be possible to extend the measured, indicated and inferred
arcs slightly beyond historically accepted practices due to consistent geological settings. The QP’s
have elected not to extend arc distances, introducing a level of conservatism in the coal
classification.
>
All relevant factors have been accounted for and reflect the Competent Person’s
 
view of the
deposit.
Audits or reviews
>
The results of any audits or reviews of Mineral Resource estimates.
>
MM&A completed prepared a statement of coal resources and reserves for the Properties in
accordance with the JORC Code as of December 31, 2017.
 
MM&A also subsequently updated the
estimate of resources and reserves for depletion as of December 31, 2018, December 31, 2019,
December 31, 2020 and December 31, 2021.
>
MM&A performed a previous audit of the Properties in year 2017 for Coronado based on U.S.
Securities and Exchange Commission (SEC) Industry Guide 7 and USGS Circular 891 standards.
 
>
Earlier audits were performed by various independent consultants for predecessors-in-title to
Coronado and at various levels of detail depending on the clients concerns and the allotted time for
completion.
 
Previous audits and reviews defined the primary coal resource areas and estimated the
recoverable tonnes for each seam based on the expected mining methods.
 
>
Additionally, MM&A has performed proprietary evaluations for predecessors-in-title to Coronado,
which encompass portions of the Properties included in this TRS.
Discussion of relative
accuracy/ confidence
>
Where appropriate a statement of the relative accuracy and confidence level in the Mineral
Resource estimate using an approach or procedure deemed appropriate by the Competent
Person. For example, the application of statistical or geostatistical procedures to quantify the
relative accuracy of the resource within stated confidence limits, or, if such an approach is not
deemed appropriate, a qualitative discussion of the factors that could affect the relative
accuracy and confidence of the estimate.
>
The statement should specify whether it relates to global or local estimates, and, if local, state
the relevant tonnages, which should be relevant to technical and economic evaluation.
Documentation should include assumptions made and the procedures used.
>
These statements of relative accuracy and confidence of the estimate should be compared
with production data, where available.
>
The relative accuracy of and confidence in the coal tonnage and quality estimates provided herein
are judged to be in conformance with current industry best-practices.
 
>
The representation of average coal quality characteristics should be understood to represent a
reasonably representative sampling that is generally indicative of coal quality and does not
represent a statistically rigorous approach to coal quality modeling.
>
Resource estimation has been completed using standard coal estimation methods which are
deemed appropriate for this deposit.
Section 4 Estimation and Reporting of Ore Reserves
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral Resource
estimate for
conversion to Ore
Reserves
 
>
Description of the Mineral Resource estimate used as a basis for the conversion to an Ore
Reserve.
>
The coal resource estimate was prepared as part of the report Coronado Global Resources Inc.
Statement of Coal Resources and Reserves in Accordance with JORC Code and United States SEC
Standards as of December 31, 2022 – Northern and Central Appalachian Coal Basins – Virginia, West
Virginia and Pennsylvania, USA – February 2023 prepared by MM&A.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
12
Criteria
JORC Code explanation
Commentary
>
The resource estimation criteria were developed by MM&A based on the capabilities of the mining
equipment used within the production model and on industry-accepted standards to assure that the
basic geologic characteristics of the coal resources are in reasonable conformity with those to be
mined and marketed by Coronado.
>
Clear statement as to whether the Mineral Resources are reported additional to, or inclusive
of, the Ore Reserves.
>
Coal resources generally are reported inclusive of the coal reserves.
 
In some cases, resources are
reported in addition to coal reserves.
 
Tables 1-1 and 11-3 of the TRS clearly identify resources
“inclusive of mine plan” from which coal reserves were estimated along with those resources
“exclusive of mine plan” from which no reserves were estimated.
 
Site visits
 
>
Comment on any site visits undertaken by the Competent Person and the outcome of those
visits.
>
MM&A is very familiar with the Properties and has conducted multiple site visits throughout the
years.
Study status
 
>
The type and level of study undertaken to enable Mineral Resources to be converted to Ore
Reserves.
>
A preliminary feasibility LOM plan was prepared by MM&A for active and proposed mines.
 
>
The Code requires that a study to at least Pre-Feasibility Study level has been undertaken to
convert Mineral Resources to Ore Reserves. Such studies will have been carried out and will
have determined a mine plan that is technically achievable and economically viable, and that
material Modifying Factors have been considered.
>
This geologic evaluation conducted in accordance with JORC and SEC standards and in conjunction
with the preliminary feasibility study is sufficient to conclude that the surface, highwall miner and
underground coal reserves identified on the Properties are economically mineable under reasonable
expectations of market prices for thermal and metallurgical coal products, estimated operation
costs, and capital expenditures.
>
The pre-feasibility financial models, prepared by MM&A for this TRS, was developed to test the
economic viability of each coal resource area.
>
Proved and probable coal reserve were derived from the defined in-situ coal resource considering
relevant processing, economic (including independent estimates of capital, revenue and cost,
marketing, legal, environmental, socioeconomic, and regulatory factors).
Cut-off parameters
 
>
The basis of the adopted cut-off grade(s) or quality parameters applied.
>
The cut-off parameters were tailored for each of the Coronado properties to be in accordance with
mining/ processing capabilities and market conditions prevalent at each operation.
>
Examples include minimum recoverable coal thickness, acceptable ash content and wash recovery,
and manageable overburden to coal ratio for surface mineable coal.
>
Details of the parameters are cited within the TRS and included in the table of Cut-off Parameters
listed in Section 11.1 of this TRS.
>
These cut-off parameters have been developed by MM&A based on its experience with the
Coronado properties and are typical of mining operations in the Central Appalachian coal basin.
 
This
experience includes technical and economic evaluations of numerous properties in the region for
the purposes of determining the economic viability of the subject coal reserves.
Mining factors or
assumptions
 
>
The method and assumptions used as reported in the Pre-Feasibility or Feasibility Study to
convert the Mineral Resource to an Ore Reserve (i.e. either by application of appropriate
factors by optimisation or by preliminary or detailed design).
>
After validating coal seam data and establishing correlations, the thickness and elevation for seams
of economic interest were used to generate a geologic model.
>
A pre-feasibility LOM plan was prepared by MM&A for active and proposed mines.
 
MM&A prepared
mine projections and production timing forecasts based on coal seam characteristics.
 
Production
timing was carried out from 2023 to depletion (exhaustion) of the coal reserve areas.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
13
Criteria
JORC Code explanation
Commentary
>
The choice, nature and appropriateness of the selected mining method(s) and other mining
parameters including associated design issues such as pre-strip, access, etc.
>
The room-and-pillar mining method was selected to model the underground mining resources,
utilizing continuous miners for coal extraction, shuttle cars for production section haulage and roof
bolters for roof control, with the exception that the Buchanan Mine also uses longwall shearers,
armored face conveyors, and hydraulic self-advancing roof support.
 
The resource areas located
above drainage are relatively small and often have irregular boundaries.
The Buchanan Mine in
Buchanan County, Virginia is the only active longwall mine currently being operated by Coronado.
>
The Coronado underground mining resource areas which are located above-drainage require an
access road and mine access development along the outcrop, whereas below-drainage mines are
accessed via shaft or slope based on other proposed surface infrastructure locations and/or surface
property control.
 
>
The surface mining method selected utilizes highly productive hydraulic shovels, front-end loaders,
large tractors and rock trucks for overburden removal.
 
The mobile equipment spreads adapt readily
to winding coal outcrops for contour surface mining and are effective for point-removal and area
mining applications.
>
Application of highwall and auger mining units is an effective method to recover coal resources not
suitable for underground mining and under excessive cover for surface mining.
>
The assumptions made regarding geotechnical parameters (e.g. pit slopes, stope sizes, etc.),
grade control and pre-production drilling.
>
Mining plans for potential underground mines were developed by MM&A.
 
Pillar stability was tested
by MM&A using the
Analysis of Coal Pillar Stability (ACPS
) program that was developed by the
National Institute for Occupational Safety and Health (
NIOSH
)
.
 
>
Coronado must obtain approved mining plans from
United States Department of Labor Mine Safety
and Health Administration (
MSHA
)
that define safety parameters for the highwalls developed
during contour and area mining.
 
MM&A’s planning model does not require input of specific
highwall design parameters, but provides for timing of mining within mine plan polygons that is
representative of the operation performance attained at Central Appalachia surface mines.
>
Highwall and auger mining is conducted under highwalls designed and constructed to meet MSHA
permit requirements.
 
To better assure highwall stability and safety
 
during highwall coal extraction,
MSHA requires that coal fenders, or stumps, be left in place between successive cuts. Periodic
barrier pillars must be left in place as an additional safeguard.
 
MM&A has adjusted the expected
mining recovery for highwall and auger mining resources to reflect highwall stability and safety
requirements.
>
The major assumptions made and Mineral Resource model used for pit and stope optimisation
(if appropriate).
>
Underground Mining Resources:
 
For metallurgical resources, minimum coal seam thickness extends
down to between 0.6 and 1.2 meters and a minimum overburden (depth of cover) of 30.5 meters.
 
A
61-meter horizontal distance is maintained from abandoned mines and sealed or pillared areas, and
a 30-meter horizontal distance is maintained from planned highwall miner panels.
 
Mine recovery is
reduced when a rider coal seam is present within a 1.5- to 3.0-meter interval above the coal seam.
 
No mining is projected when the interval between overlying and underlying reserves is less than 12
meters.
>
Surface Mining Resources:
 
For classification as a surface-mineable resource, a seam must be at least
0.3 meters in thickness as a stand-alone (principle) seam and 0.15 meters in thickness when less
than 0.8 meters from a principal seam.
 
The maximum cumulative area mining strip ratio is generally
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
14
Criteria
JORC Code explanation
Commentary
20:1 for thermal coal and 30:1 for metallurgical coal.
 
Some areas were assessed for their economic
viability at higher ratios, and were included as reserves if deemed economic.
 
For contour surface
mining, a minimum of 38-meter bench is provided to support HWM.
>
HWM and Auger Mining Resources: HWM cut depth (penetration) is established at a maximum of
244 meters.
 
The minimum mineable coal thickness is limited at 0.6 meters. For coal seams less than
0.8 meters thick, roof and/or floor characteristics must allow OSD cutting to maintain a 0.8-meter
minimum cutting height.
Auger mining cut depth is established at an average of 91 meters.
 
The
minimum mineable coal thickness is limited at 0.5 meters.
>
The mining dilution factors used.
>
Underground Mining Reserves:
 
The planning model assigns minimum mining heights of 1.4 to 1.8
meters for mains and panel development.
 
At the Buchanan Mine, a minimum mining height of 1.8
meters was used due to the longwall mining method being employed.
 
For coal seams thinner than
the assigned mining height, the difference between the coal seam height and assigned mining
height consists of OSD.
 
In all cases a minimum of 0.05 meters of OSD was assumed, with the
exception of the Mon Valley mines, where a minimum 0.15 meters of OSD was assumed due to
weaker floor strata.
>
Surface Mining Reserves:
 
Area mining is generally limited to a cumulative overburden ratio of 30:1
and a 15:1 ratio for contour mining.
 
Exceptions were considered for mining of metallurgical grade
coal where deemed economical.
 
It is assumed that careful cleaning of exposed coal pits will result in
minimal OSD.
>
HWM and Auger Mining Reserves:
 
The mining plan assumes that the HWM cutting height is a
minimum of 76 to 99 centimeters for clearance purposes.
 
When the coal seam is less than 76 to 99
centimeters thick, OSD assumed and included in the ROM product.
Because the auger has very
limited OSD cutting ability, it is assumed that an appropriate auger diameter will be chosen based on
the coal seam thickness and that OSD will be minimal.
>
The mining recovery factors used.
>
Underground Mining Reserves:
 
Mine recovery generally varies between 40 and 60 percent for
continuous mining panels, and 100 percent for longwall.
>
Surface Mining Reserves:
 
Mining recovery is 90 percent for virgin areas.
 
Mining recovery is reduced
where second mining is projected in previously underground and auger mined areas.
>
HWM and Auger Mining Reserves:
 
A mine recovery of 40 percent has been applied for HWM.
A
mine recovery of 35 percent has been applied for auger mining.
>
Any minimum mining widths used.
>
Underground Mining Reserves:
 
Typical entry width is 5.8 to 6.1 meters.
>
The manner in which Inferred Mineral Resources are utilised in mining studies and the
sensitivity of the outcome to their inclusion.
>
Proved and probable coal reserve were derived from the defined in-situ coal resource considering
relevant processing, economic (including independent estimates of capital, revenue and cost,
marketing, legal, environmental, socioeconomic, and regulatory factors).
>
Mine plan LOM tonnage includes inferred coal and those areas that do not meet the minimum coal
thickness requirement for classification as reserve.
 
Inferred coal represents approximately 0.6% of
the LOM production for Mon Valley and 0.000001% of the total LOM production for Logan.
 
None of
this coal was included in the estimate of reserves.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
15
Criteria
JORC Code explanation
Commentary
>
The infrastructure requirements of the selected mining methods.
>
Underground Mining Resources:
 
The continuous mining method provides for the extraction of coal
from the production faces using continuous miners (and longwall shearing machine at Buchanan)
and haulage using shuttle cars or battery haulers to a feeder-breaker located at the tail of the
section conveyor belt.
 
The feeder-breaker crushes large pieces of coal and rock and regulates coal
feed onto the mine conveyor.
 
A chain conveyor is used to remove coal from the longwall face at the
Buchanan Mine for placement onto the conveyor belt which is ultimately delivered to an
underground storage bunker.
 
Roof-bolting machines are used to install roof bolts, and battery
scoops are available to clean the mine entries and assist in delivery of mine supplies to work areas.
 
Surface ventilation fans are installed as needed to provide a sufficient volume of air to ventilate
production sections, coal haulage and transport entries, battery charging stations, and transformers
in accordance with approved plans.
>
Coronado currently operates three coal preparation plants, one each at the Buchanan, Logan County
and Greenbrier Divisions.
 
The Buchanan Plant operates at a feed rate of approximately 907 raw
tonnes per hour (
tph
), whereas the Saunders Plant (Logan County Division) has a nominal feed rate
of 816 tph, and the Mountaineer Plant (Greenbrier Division) operates at 544 tph.
MM&A has
included capital estimates for construction of additional coal preparation plants at the Russell
County and Mon Valley Complex for the purposes of this TRS.
 
>
Surface Mining Resources: The surface mining mobile equipment spreads advance the contour and
area mining pits while systematically reclaiming the trailing side of pits where coal has been
removed.
 
The coal haul roads are extended and maintained as the pits advance.
 
Support facilities
are maintained nearby but away from the active mining, and include storage areas for blasting
agents, fuel and lubricants, and mine supplies along with maintenance facilities and offices.
 
Most of
the surface mine production is transported to a loading point for crushing, blending and direct-
shipment to customers.
 
>
HWM and Auger Resources: The HWM equipment advances along with the contour mining pits.
 
The
rate of advance of the contour mining is governed by the advancement rate of the HWM.
 
A diesel-
powered generator trails the highwall miner and powers the continuous mining unit.
 
Other support
facilities are provided along with the contour mining support facilities.
 
HWM production is all
transported by truck to the coal preparation plant for washing.
Metallurgical factors
or assumptions
 
>
The metallurgical process proposed and the appropriateness of that process to the style of
mineralisation.
>
Coarse material is washed in a heavy medium vessel.
 
Intermediate-size material is washed in heavy
medium cyclones.
 
Fine material is washed using conventional froth flotation cells.
>
Whether the metallurgical process is well-tested technology or novel in nature.
>
Processes are typical of those used in the coal industry and are in use at adjacent coal processing
plants.
>
The nature, amount and representativeness of metallurgical test work undertaken, the nature
of the metallurgical domaining applied and the corresponding metallurgical recovery factors
applied.
>
The quality characteristics for the subject coal resources and coal reserves have been reviewed in
detail by MM&A.
 
The drill hole data were utilized to develop average coal quality characteristics
mining site.
 
These average coal quality characteristics were then utilized as the basis for
determining the various markets into which the saleable coal will likely be placed.
>
Any assumptions or allowances made for deleterious elements.
>
No significant effects on product quality are anticipated from dilution material; float product quality
was used to model final product quality.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
16
Criteria
JORC Code explanation
Commentary
>
The existence of any bulk sample or pilot scale test work and the degree to which such
samples are considered representative of the orebody as a whole
>
No bulk sample or pilot scale work has been completed.
>
For minerals that are defined by a specification, has the ore reserve estimation been based on
the appropriate mineralogy to meet specifications?
>
Notwithstanding the complexity of the coal quality data set, the seams of the central and northern
Appalachian coalfields have a long history of providing both high-Btu thermal coals and high-, mid-
and low-volatile coking coals with favorable metallurgical properties.
Environmental
 
>
The status of studies of potential environmental impacts of the mining and processing
operation. Details of waste rock characterisation and the consideration of potential sites,
status of design options considered and, where applicable, the status of approvals for process
residue storage and waste dumps should be reported.
>
MM&A completed a Limited Phase I Environmental Site Assessment (
ESA
) on the Buchanan property
in April 2016, and on the Logan County and Greenbrier Properties in May 2017 on behalf of
Coronado.
>
MM&A identified one REC at Greenbrier associated with stained soil and gravel near a fueling and
maintenance area.
 
Coronado reported to MM&A that satisfactory clean-up efforts were completed
at Greenbrier.
>
Based on these former ESAs completed by MM&A, it is MM&A’s opinion that Coronado has a
generally typical coal industry record of compliance with applicable mining, water quality, and
environmental laws.
 
Estimated costs for mine closure, including water quality monitoring during
site reclamation, are included in the TRS financial models.
Infrastructure
 
>
The existence of appropriate infrastructure:
 
availability of land for plant
 
development, power,
water, transportation
 
(particularly for bulk commodities), labour, accommodation; or the ease
with which the infrastructure can be provided or accessed.
>
Coronado currently operates one surface mine (Toney Fork Mine at the Logan Mine Complex);
Coronado also controls the idle Midland Surface Mine at the Greenbrier Mine Complex.
 
>
Coronado operates five underground mines as follows:
 
Buchanan Mine at the Buchanan Mine
Complex; Winifrede, Eagle No. 1, Muddy Bridge and Lower War Eagle Mines in the Logan Mine
Complex; the Mountaineer #1 Mine at the Greenbrier Mine Complex is currently idle.
>
All ROM production is currently planned for either truck transportation from the mines to the
processing or shipping facilities, or in some cases there is either a current or planned mine mouth
preparation plant and barge/rail loading facility.
 
>
There is a network of public highways that provide serviceable coal haul routes and private, internal
roads on the Properties would be developed as may be needed.
 
Rail service to the Properties is
most readily provided by NS and CSX
with connections to both domestic consumers and
international trans-shipment points.
 
NS track is located across the Monongahela River from the
proposed Pangburn Hollow load-out facility.
 
Coal would be shipped to customers via barge and rail
and sold as both metallurgical and thermal products.
 
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
17
Criteria
JORC Code explanation
Commentary
Costs
 
>
The derivation of, or assumptions made, regarding projected capital costs in the study.
>
The methodology used to estimate operating costs.
>
Coronado provided historical and 5-year budget operating costs for its active mines for MM&A’s
review.
 
MM&A used the historical and/or budget cost information as a reference and developed
personnel schedules for each mine.
 
Hourly labor rates and salaries were based upon information
contained in Coronado’s financial summaries.
 
Fringe benefit costs were developed for vacation and
holidays, federal and state unemployment insurance, retirement, workers’ compensation and
pneumoconiosis, casualty and life insurance, healthcare and bonuses.
 
A cost factor for mine
supplies was developed that relates expenditures to mine advance rates for roof control costs and
other mine supply costs at underground mines.
 
Other factors were developed for maintenance and
repair costs, rentals, mine power, outside services and other direct mining costs.
>
Surface mine direct operating costs were developed as a function of overburden ratio for repair and
maintenance supplies, diesel fuel, explosives and blasting, and miscellaneous supplies
 
and services.
 
Operating costs for highwall mines are based on costs per ROM tonne estimates.
 
Other cost factors
were developed for coal preparation plant processing, refuse handling, coal loading, trucking,
property taxes, and insurance and bonding.
 
Appropriate royalty rates were assigned for production
from leased coal lands and sales taxes were calculated for state severance taxes,
 
the federal black
lung excise tax, and federal and state reclamation fees.
>
Capital schedules were developed by MM&A for mine development, infrastructure, and on-going
capital requirements for the life of each projected mine.
>
Staffing levels were prepared and operating costs estimated by MM&A for each projected mine.
 
MM&A utilized historical cost data provided by Coronado and its own knowledge and experience to
estimate direct and indirect operating costs.
 
>
Allowances made for the content of deleterious elements.
>
No allowances have been made for deleterious elements; no impact to quality from deleterious
elements is anticipated.
>
The derivation of assumptions made of metal or commodity price(s), for the principal minerals
and co- products.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges.
 
Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne.
 
MM&A utilized this data for price
forecasting in financial modeling.
>
Derivation of transportation charges.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges.
 
Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne.
 
MM&A utilized this data for price
forecasting in financial modeling.
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
18
Criteria
JORC Code explanation
Commentary
>
The basis for forecasting or source of treatment and refining charges, penalties for failure to
meet specification, etc.
>
MM&A utilized historical cost data provided by Coronado and its own knowledge and experience to
estimate direct and indirect operating costs.
 
All ROM production is currently planned for either
truck transportation from the mines to the processing or shipping facilities, or in some cases there is
either a current or planned mine mouth preparation plant and barge/rail loading facility.
>
The allowances made for royalties payable, both Government and private.
>
Appropriate royalty rates were assigned for production from leased coal lands and sales taxes were
calculated for state severance taxes, the federal
 
black lung excise tax, and federal and state
reclamation fees.
Revenue factors
 
>
The derivation of, or assumptions made regarding revenue factors including head grade, metal
or commodity price(s) exchange rates, transportation and treatment charges, penalties, net
smelter returns, etc.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges.
 
Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne.
 
MM&A utilized this data for price
forecasting in financial modeling.
>
The derivation of assumptions made of metal or commodity price(s), for the principal metals,
minerals and co-products.
>
Coal sales prices as defined above.
 
All reported reserves are on a marketable basis.
Market assessment
 
>
The demand, supply and stock situation for the particular commodity, consumption trends and
factors likely to affect supply and demand into the future.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges.
 
Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne.
 
MM&A utilized this data for price
forecasting in financial modeling.
>
A customer and competitor analysis along with the identification of likely market windows for
the product.
>
All of the mine production serves metallurgical and thermal markets.
 
The metallurgical coal is
marketed as high-volatile (typically 28 percent or greater volatile matter content); mid-volatile
(typically 23- to 27-percent volatile matter content) and low-volatile (typically less than 23 percent
volatile matter content) products.
>
Raw ROM production that requires washing is currently processed through Coronado owned and
operated coal preparation plants.
 
>
ROM coal that does not require further processing is delivered directly to the loading points for
sizing and delivery to customers.
 
Coronado has access to two rail-loading points serviced by the
Norfolk Southern Corporation (
NS
)
 
and two rail-loading points serviced by
CSX Corporation (
CSX
)
.
>
Price and volume forecasts and the basis for these forecasts.
>
Carlson Mining
®
 
was used by MM&A to generate mine plans for underground-
 
and surface-mineable
coal seams.
 
Underground mine plans were sequenced based on productivity schedules provided by
Coronado, which were based on historically achieved productivity levels.
 
Surface mine plans were
generated under productivity assumptions (bank cubic yard per shift) as provided by Coronado and
reviewed by MM&A, again based heavily on productivity levels achieved by Coronado.
 
All
production forecasting ties assumed production rates to geological models as constructed
independently by MM&A’s team of geologists and mining engineers.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
19
Criteria
JORC Code explanation
Commentary
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges.
 
Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne.
 
MM&A utilized this data for price
forecasting in financial modeling.
Economic
 
>
The inputs to the economic analysis to produce the net present value (NPV) in the study, the
source and confidence of these economic inputs including estimated inflation, discount rate,
etc.
>
On an unlevered basis, the NPV of the project cash flows after taxes was estimated for the purpose
of classifying coal reserves.
 
The project cash flows, excluding debt service, are calculated by
subtracting direct and indirect operating expenses and capital expenditures from revenue.
 
Direct
costs include labor, drilling and blasting, operating supplies, maintenance and repairs, facilities costs
for materials handling, coal preparation, refuse disposal, coal loading, sampling and analysis
services, reclamation and general and administrative costs.
 
Indirect costs include statutory and
legally agreed upon fees related to direct extraction of the mineral.
 
The indirect costs are the
Federal black lung tax, Federal and State reclamation taxes, property taxes,
 
local transportation
prior to delivery at rail or barge loading sites, coal production royalties, sales and use taxes, income
taxes and State severance taxes. Coronado’s
 
historical costs provided a useful reference for MM&A’s
cost estimates.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges.
 
Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne.
 
MM&A utilized this data for price
forecasting in financial modeling.
>
All costs and prices are based on 2022 nominal United States dollars.
>
A pre-feasibility LOM plan was prepared by MM&A for active and proposed mines.
 
MM&A prepared
mine projections and production timing forecasts based on coal seam characteristics.
 
Production
timing was carried out from 2023 to depletion (exhaustion) of the coal reserve areas, which is
projected for the year 2100.
>
The all-mines average cash cost ranges between approximately $65 and $317 per tonne for most of
the operating period.
>
NPV ranges and sensitivity to variations in the significant assumptions and inputs.
>
An estimate of NPV at a base discount rate of 10.0% was included in Section 19 of the TRS.
>
NPV of the Buchanan, Russell, Mon Valley, Logan and Greenbrier Properties was estimated to be
$1.562 billion, $92.2 million, $168.3 million, $366.6 million
 
and $62.7 million, respectively.
>
The sensitivity study shows the NPV at the 10.0% discount rate when Base Case sales prices,
operating costs, and capital costs are increased and decreased in increments of 5% within a +/- 15%
range.
 
Social
 
>
The status of agreements with key stakeholders and matters leading to social license to
operate.
>
Portions of the properties are located near local communities.
 
Regulations prohibit mining activities
within 91 meters of a residential dwelling, school, church, or similar structure unless written consent
is first obtained from the owner of the structure.
 
Where required, such consents have been
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
20
Criteria
JORC Code explanation
Commentary
obtained where mining is proposed beyond the regulatory limits.
Other
 
To the extent relevant, the impact of the following on the project and/or on the estimation and classification of
the Ore Reserves:
>
Any identified material naturally occurring risks.
>
No material naturally occurring risks have been identified.
>
The status of material legal agreements and marketing arrangements.
>
The Coronado coal resources are located in Buchanan, Russell and Tazewell Counties, Virginia;
Greenbrier, Logan, Boone, Wyoming and Greenbrier Counties, West Virginia; Allegheny,
 
Washington
and Westmoreland Counties, Pennsylvania.
>
MM&A has not carried out separate title verification for the coal properties and has not verified
leases, deeds, surveys or other property control instruments pertinent to the subject resources.
>
Coronado has represented to MM&A that it controls the mining rights to the reserves as shown on
its property maps, and MM&A has accepted these as being a true and accurate depiction of the
mineral rights controlled by Coronado.
 
The TRS assumes the properties are developed under
responsible and experienced management.
>
The status of government agreements and approvals critical to the viability of the project,
such as mineral tenement status and government and statutory approvals. There must be
reasonable grounds to expect that all necessary Government approvals will be received within
the timeframes anticipated in the Pre-Feasibility or Feasibility study. Highlight and discuss the
materiality of any unresolved matter that is dependent on a third part on which extraction of
the reserve is contingent.
>
Coronado has obtained all mining and discharge permits to operate 34 underground mines, 13
surface mines, and 18 processing, loadout or related facilities.
 
MM&A is unaware of any obvious or
current Coronado permitting issues that are expected to prevent the issuance of future permits.
 
Coronado, along with all Central and Northern Appalachian basin coal producers, is subject to a level
of uncertainty regarding future clean water permits due to
United States Environmental Protection
Agency
(
EPA
)
 
involvement with state programs.
Classification
 
>
The basis for the classification of the Ore Reserves into varying confidence categories.
Whether the result appropriately reflects the Competent Person’s view of the deposit. The
proportion of Probable Ore Reserves that have been derived from Measured Mineral
Resources (if any).
>
Measured and indicated resources have been converted to proved and probable reserves,
respectively.
>
None of the probable coal reserves have been derived from measured resources.
>
In a limited number of cases where there was only very limited data available to demonstrate the
metallurgical suitability of a given coal deposit, that deposit was classified as a probable reserve
instead of a proved reserve.
>
The results of this TRS define an estimated total initial ROM recoverable ore (coal) reserve estimate
of 551 million tonnes for Coronado as follows:
a)
Buchanan =
 
154 Mt
b)
Logan
 
=
 
138 Mt
c)
Greenbrier=
 
12 Mt
d)
Russell =
 
50 Mt
e)
Mon Valley =
 
197 Mt
 
>
Coronado controls a total of 334 Mt (moist basis) of marketable coal reserves for Coronado as of
December 31, 2022 (total may not add due to rounding).
 
Of that total, 74 percent are proved, and
26 percent are probable.
 
Total reserves by complex are as follows:
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
21
Criteria
JORC Code explanation
Commentary
a)
Buchanan =
 
93 Mt
b)
Logan
 
=
 
71 Mt
c)
Greenbrier=
 
7 Mt
d)
Russell =
 
30 Mt
e)
Mon Valley =
 
134 Mt
 
Audits or reviews
>
The results of any audits or reviews of Ore Reserve estimates.
>
MM&A completed prepared a statement of coal resources and reserves for the Properties in
accordance with the JORC Code as of December 31, 2017.
 
MM&A also subsequently updated the
estimate of resources and reserves for depletion as of December 31, 2018, December 31, 2019,
December 31, 2020 and December 31, 2021.
>
MM&A performed a previous audit of the Properties in year 2017 for Coronado based on
U.S.
Securities and Exchange Commission (
SEC
)
 
Industry Guide 7 standards.
 
Earlier audits were
performed by various independent consultants for predecessors-in-title to Coronado and at various
levels of detail depending on the clients concerns and the allotted time for completion.
 
Previous
audits and reviews defined the primary coal resource areas and estimated the recoverable tonnes
for each seam based on the expected mining methods.
>
Additionally, MM&A has performed proprietary evaluations for predecessors-in-title to Coronado,
which encompass portions of the Properties included in this TRS.
Discussion of relative
accuracy/ confidence
 
>
Where appropriate a statement of the relative accuracy and confidence level in the Ore
Reserve estimate using an approach or procedure deemed appropriate by the Competent
Person. For example, the application of statistical or geostatistical procedures to quantify the
relative accuracy of the reserve within stated confidence limits, or, if such an approach is not
deemed appropriate, a qualitative discussion of the factors which could affect the relative
accuracy and confidence of the estimate.
>
Operations on the Properties by Coronado and its predecessors have been on-going for many years.
 
>
MM&A is confident that the mine plans and financial models are reasonably representative to
provide an accurate estimation of coal reserves.
>
Mine development and operation have not been optimized within the TRS.
>
The statement should specify whether it relates to global or local estimates, and, if local, state
the relevant tonnages, which should be relevant to technical and economic evaluation.
Documentation should include assumptions made and the procedures used.
>
Proved and probable coal reserve were derived from the defined in-situ coal resource considering
relevant processing, economic (including independent estimates of capital, revenue and cost),
marketing, legal, environmental, socioeconomic, and regulatory factors on a global scale as current
local data reflects the global assumptions.
>
Accuracy and confidence discussions should extend to specific discussions of any applied
Modifying Factors that may have a material impact on Ore Reserve viability, or for which there
are remaining areas of uncertainty at the current study stage.
The major risk factors for the active Coronado mines and future resource development are summarized below:
>
Mine Accidents
>
Highwall Failure.
 
Highwall failures are likely to result in a temporary mine closure and should not
have a material impact on the mine sustainability.
 
The risk is considered to be probable.
 
>
Adverse Geological Conditions.
 
Adverse geological conditions include such conditions as faults and
sandstone washouts.
 
The risk is considered to be probable.
 
The impact is expected to be temporary
with little material impact on mine sustainability.
>
Environmental Risk.
 
Numerous federal and state permits are required to operate coal mines and
mine surface facilities. Permitting rules are complex and may change over time, making compliance
difficult or impossible.
>
Water Quality.
 
Permit requirements to fulfill Clean Water Act obligations are subject to
modification.
 
The probability of water quality changes having a material impact on mine operations
 
 
ex962p2i0
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
22
Criteria
JORC Code explanation
Commentary
is possible.
 
As a contemporary example, the selenium discharge issue that affects western Canadian
and Central Appalachian Basin operators has only recently emerged as a concern and its ultimate
impact has not been determined.
>
New Permits.
 
Permit protests by environmental groups and individuals can contribute to permit
delays or denial and increase the cost of permitting and delay development.
 
Surface mining
activities, coal refuse disposal and construction of access roads in mountainous terrain often require
storage of material in valley fills.
 
Authority to dispose of fill material into waters of the United
States must be granted by the
United States Army Corps of Engineers (
COE
)
.
 
COE permits are
increasingly difficult to obtain.
>
Regulatory Requirements.
 
Adverse impact from regulatory changes is considered to be probable.
 
The impact will likely affect the broader industry and is not expected to result in mine closure.
>
Market Risk.
 
Metallurgical and thermal coal markets ultimately depend upon the global steel and
thermal coal demand and are considered to be volatile.
 
Currently, the US coal market has seen a
decline in demand for thermal coal due to thermal plant closures, as a result of new air and water
pollution regulations, and competition from other commodities used for power generation such as
natural gas.
 
This has resulted in an overall decline in CAPP coal production.
 
Continued regulatory
changes and declining demand could result in material changes in domestic and global coal markets.
 
The impact cannot be predicted at this time; however, while MM&A expects the coal reserve within
this TRS to remain economically viable throughout the life of the projected mines, the LOM financial
model is very sensitive to changes in coal sales price and therefore market risk is not insignificant.
>
Labor Risk.
 
Work stoppage due to organized labor protests is considered to be unlikely and not
likely to lead to permanent mine closure.
 
The mines are likely to suffer the loss of key supervisors
and skilled employees due to retirement as the workforce ages.
 
The problem is industry-wide and
the impact is expected to be temporary and have no sustained impact on coal production.
>
Availability of Equipment and Supplies.
 
Risk of equipment and supply availability is likely to be
temporary and should not have a sustained adverse impact on the production of coal.
>
Transportation Delay.
 
Interruption of coal transport services by river or rail is considered to be
probable but unlikely to have a sustained impact on coal production.
>
It is recognised that this may not be possible or appropriate in all circumstances. These
statements of relative accuracy and confidence of the estimate should be compared with
production data, where available.
>
Mine plans, productivity expectations and cost estimates generally reflect historical performance
and efforts have been made to adjust plans and costs to reflect future conditions.
ex963p1i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of December 31, 2022
Central Appalachian Coal Basin
West Virginia, USA
February 2023
Prepared for:
Coronado Global Resources Inc.
 
100 Bill Baker Way
 
Beckley, West
 
Virginia 25801
Prepared by:
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
582 Industrial Park Road
Bluefield, Virginia
 
24605
www.mma1.com
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Statement of Use and Preparation
This Technical Report Summary (
TRS
) was prepared by
Marshall Miller & Associates, Inc.
 
(
MM&A
)
 
for
the sole use
 
of
Coronado Global Resources Inc.
 
(
Coronado
)
and its affiliated and
 
subsidiary companies
and advisors.
 
Copies or references to information
 
in this report may not be used without the written
permission of Coronado.
This report provides
 
a statement
 
of coal resources
 
and coal reserves
 
for Coronado,
 
as defined under
the
Australasian
 
Code
 
for
 
Reporting
 
of
 
Exploration
 
Results,
 
Mineral
 
Resources
 
and
 
Ore
 
Reserves
(
JORC Code
) as
 
well as
 
under Subpart
 
1300 of
 
Regulation
 
S-K (Regulation
 
S-K 1300)
 
promulgated
 
by
the
United
 
States
 
Securities
 
and
 
Exchange
 
Commission
 
(
SEC
)
.
 
Subject
 
to
 
the
 
comments
 
below,
 
this
report was also prepared in accordance with the
Australasian Code for Public Reporting of Technical
Assessments and Valuations of Mineral Assets
(
VALMIN Code
).
 
The statement is based
 
on information provided by
 
Coronado and reviewed by
Qualified Persons
 
(
QPs
)
who are full-time employees of MM&A.
As noted
 
above, this
 
report is
 
a “Public
 
Report” for
 
the purposes
 
of the
 
VALMIN
 
Code.
 
However,
 
in
accordance with paragraph 12.1 of the VALMIN Code, it is noted that this report is not a “Valuation of
Mineral Assets”,
 
and it also does not comply with the following requirements that apply to “Technical
Assessments” (as defined in the VALMIN Code):
This report does not include a determination of the status of tenure (as required
 
by paragraph 7.2
of the VALMIN Code) on the basis that tenure was separately
 
reviewed by Coronado’s
 
legal
advisors.
This report does
 
not include
 
separate commentary on the
 
reasonableness and
 
quality of
 
the Resources
and Reserves estimates and the
 
basis on which
 
they have been reported (as
 
required by paragraph 7.3
of
 
the
 
VALMIN
 
Code).
 
MM&A
 
did
 
not
 
consider
 
that
 
this
 
was
 
appropriate
 
in
 
circumstances
 
where
MM&A was
 
engaged for
 
the specific
 
purpose of
 
preparing those
 
estimates.
 
However,
 
MM&A notes
that, in
 
accordance
 
with its
 
usual practice,
 
a separate
 
team of
 
MM&A employees
 
undertook a
 
peer
review of this
 
report and confirmed
 
that both the process
 
followed by
 
the authors of
 
this report and
the estimates prepared were reasonable
 
and comply with the requirements of the JORC Code.
 
 
 
 
ex963p2i0
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
The information
 
in this TRS
 
related to
 
coal resources
 
and reserves
 
is based on,
 
and fairly represents,
information compiled
 
by the QPs.
 
At the
 
time of reporting,
 
MM&A’s
 
QPs have
 
sufficient experience
relevant to the style of mineralization and type of
 
deposit under consideration and to the activity
 
they
are
 
undertaking
 
to qualify
 
as a
 
QP as
 
defined
 
by Regulation
 
S-K 1300
 
and the
 
JORC Code.
 
Each
 
QP
consents
 
to
 
the
 
inclusion
 
in
 
this
 
report
 
of
 
the
 
matters
 
based
 
on
 
their
 
information
 
in
 
the
 
form
 
and
context in which it appears.
Marshall Miller & Associates,
 
Inc. (
MM&A
)
 
hereby consents to the
 
use of the information
 
contained
in
 
this
 
report
 
dated
 
December
 
31,
 
2022,
 
relating
 
to
 
estimates
 
of
 
coal
 
resources
 
and
 
coal
 
reserves
controlled by Coronado.
 
Qualified Person:
/s/ Marshall Miller & Associates, Inc.
Date:
February 15, 2023
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Table
 
of
 
Contents
1
Executive Summary
 
................................
 
................................
 
................................
 
...............
 
1
1.1
Property Description .................................................................................................
 
1
1.2
Ownership .................................................................................................................
 
2
1.3
Geology......................................................................................................................
 
3
1.4
Exploration Status .....................................................................................................
 
3
1.5
Operations and Development
 
...................................................................................
 
3
1.6
Mineral Resource ......................................................................................................
 
4
1.7
Mineral Reserve ........................................................................................................
 
4
1.8
Capital Summary .......................................................................................................
 
5
1.9
Operating Costs .........................................................................................................
 
6
1.10
Economic Evaluation .................................................................................................
 
7
1.10.1
Discounted Cash Flow Analysis .................................................................
 
10
1.10.2
Sensitivity Analysis ....................................................................................
 
11
1.11
Permitting
 
................................................................................................................
 
11
1.12
Conclusion and Recommendations
 
.........................................................................
 
11
2
Introduction
 
................................
 
................................
 
................................
 
........................
 
12
2.1
Registrant and Terms
 
of Reference.........................................................................
 
12
2.2
Information Sources
 
................................................................................................
 
13
2.3
Personal Inspections ...............................................................................................
 
14
3
Property Description ................................................................
 
................................
 
...........
 
14
3.1
Location
 
...................................................................................................................
 
14
3.2
Titles, Claims or Leases
 
............................................................................................
 
15
3.3
Mineral Rights .........................................................................................................
 
15
3.4
Encumbrances .........................................................................................................
 
16
3.5
Other Risks ..............................................................................................................
 
16
4
Accessibility, Climate,
 
Local Resources, Infrastructure and Physiography
 
............................. 16
4.1
Topography,
 
Elevation, and Vegetation ..................................................................
 
16
4.2
Access and Transport ..............................................................................................
 
16
4.3
Proximity to Population Centers .............................................................................
 
17
4.4
Climate and Length of Operating Season
 
................................................................
 
17
4.5
Infrastructure ..........................................................................................................
 
17
5
History
 
................................
 
................................
 
................................
 
................................ 18
5.1
Previous Operation..................................................................................................
 
18
5.2
Previous Exploration ...............................................................................................
 
18
6
Geological Setting, Mineralization and Deposit
 
................................
 
................................
 
....
 
18
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
6.1
Regional, Local and Property Geology ....................................................................
 
18
6.2
Mineralization .........................................................................................................
 
20
6.3
Deposits
 
...................................................................................................................
 
21
7
Exploration ................................
 
................................
 
................................
 
.........................
 
21
7.1
Nature and Extent of Exploration ...........................................................................
 
21
7.2
Non-Drilling Procedures and Parameters
 
...............................................................
 
24
7.3
Drilling Procedures ..................................................................................................
 
24
7.4
Hydrology ................................................................................................................
 
25
7.5
Geotechnical Data ...................................................................................................
 
25
8
Sample Preparation, Analyses and Security ................................
 
................................
 
.........
 
25
8.1
Prior to Sending to the Lab......................................................................................
 
25
8.2
Lab Procedures
 
........................................................................................................
 
26
9
Data Verification ................................................................
 
................................
 
.................
 
26
9.1
Procedures of Qualified Person ..............................................................................
 
26
9.2
Limitations
 
...............................................................................................................
 
27
9.3
Opinion of Qualified Person
 
....................................................................................
 
27
10
Mineral Processing and Metallurgical Testing
 
................................
 
................................
 
......
 
27
10.1
Testing
 
Procedures
 
..................................................................................................
 
27
10.2
Relationship of Tests
 
to the Whole
 
.........................................................................
 
28
10.3
Lab Information
 
.......................................................................................................
 
28
10.4
Relevant Results ......................................................................................................
 
28
11
Mineral Resource Estimates ................................
 
................................
 
................................ 28
11.1
Assumptions, Parameters and Methodology
 
.........................................................
 
28
11.1.1
Geostatistical Analysis
 
...............................................................................
 
31
11.2
Qualified Person’s
 
Estimates
 
...................................................................................
 
34
11.3
Resources Exclusive of Reserves .............................................................................
 
35
11.3.1
Initial Economic Assessment
 
.....................................................................
 
35
11.4
Resources Inclusive of Reserves
 
..............................................................................
 
36
11.5
Qualified Person’s
 
Opinion
 
......................................................................................
 
37
12
Mineral Reserve Estimates ................................
 
................................
 
................................
 
..
 
37
12.1
Assumptions, Parameters and Methodology
 
.........................................................
 
37
12.2
Mineral Reserves
 
.....................................................................................................
 
38
12.2.1
Surface Reserves .......................................................................................
 
39
12.2.2
Underground Reserves .............................................................................
 
40
12.2.2.1
Upper Winifrede (No 8) Seam ..................................................
 
40
12.3
Qualified Person’s
 
Estimates
 
...................................................................................
 
41
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
12.4
Qualified Person’s
 
Opinion
 
......................................................................................
 
42
13
Mining Methods
 
................................
 
................................
 
................................
 
..................
 
42
13.1
Geotech and Hydrology
 
...........................................................................................
 
43
13.2
Production Rates .....................................................................................................
 
43
13.3
Mining Related Requirements ................................................................................
 
44
13.3.1
Underground
 
.............................................................................................
 
44
13.3.2
Surface Mine .............................................................................................
 
44
13.3.3
HWM .........................................................................................................
 
44
13.4
Required Equipment and Personnel .......................................................................
 
45
13.4.1
Underground Mines ..................................................................................
 
45
13.4.1.1
Powellton No. 1
 
.........................................................................
 
45
13.4.1.2
Lower War Eagle .......................................................................
 
45
13.4.1.3
Eagle No. 1/Toney
 
Fork #1
 
........................................................
 
46
13.4.1.4
Muddy Bridge
 
............................................................................
 
47
13.4.1.5
Elklick Chilton
 
............................................................................
 
47
13.4.1.6
Camp Branch Chilton ................................................................
 
48
13.4.1.7
Winifrede ..................................................................................
 
49
13.4.1.8
Lower Powellton .......................................................................
 
49
13.4.1.9
Upper Winifrede .......................................................................
 
50
13.4.2
Surface Mines and Highwall Miners .........................................................
 
51
13.4.2.1
Toney
 
Fork ................................................................................
 
52
13.4.2.2
Buffalo Creek South ..................................................................
 
52
13.4.2.3
Sugar Camp ...............................................................................
 
52
14
Processing and Recovery Methods ................................
 
................................
 
......................
 
55
14.1
Description or Flowsheet ........................................................................................
 
55
14.2
Requirements for Energy,
 
Water,
 
Material and Personnel ....................................
 
55
15
Infrastructure
 
................................
 
................................
 
................................
 
......................
 
56
16
Market Studies
 
................................
 
................................
 
................................
 
....................
 
57
16.1
Market Description..................................................................................................
 
57
16.2
Price Forecasts.........................................................................................................
 
58
16.3
Contract Requirements ...........................................................................................
 
58
17
Environmental Studies, Permitting and Plans, Negotiations or Agreements
 
with Local
Individuals
 
................................
 
................................
 
................................
 
..................
 
59
17.1
Results of Studies ....................................................................................................
 
59
17.2
Requirements and Plans for Waste
 
Disposal ..........................................................
 
59
17.3
Permit Requirements and Status ............................................................................
 
59
17.4
Local Plans, Negotiations or Agreements ...............................................................
 
62
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
17.5
Mine Closure Plans
 
..................................................................................................
 
62
17.6
Qualified Person’s
 
Opinion
 
......................................................................................
 
62
18
Capital and Operating Costs ................................
 
................................
 
................................ 62
18.1
Capital Cost Estimate ..............................................................................................
 
62
18.2
Operating Cost Estimate .........................................................................................
 
63
19
Economic Analysis
 
................................
 
................................
 
................................
 
...............
 
65
19.1
Assumptions, Parameters and Methods
 
.................................................................
 
65
19.2
Results .....................................................................................................................
 
67
19.3
Sensitivity ................................................................................................................
 
71
20
Adjacent Properties................................
 
................................
 
................................
 
.............
 
72
20.1
Information Used ....................................................................................................
 
72
21
Other Relevant Data and Information
 
................................
 
................................
 
..................
 
72
22
Interpretation and Conclusions ................................
 
................................
 
...........................
 
72
22.1
Conclusion ...............................................................................................................
 
72
22.2
Risk Factors
 
..............................................................................................................
 
72
22.2.1
Governing Assumptions ............................................................................
 
73
22.2.2
Limitations
 
.................................................................................................
 
74
22.2.3
Methodology
 
.............................................................................................
 
74
22.2.4
Development of the Risk Matrix ...............................................................
 
75
22.2.4.1
Probability Level Table ..............................................................
 
75
22.2.4.2
Consequence Level Table
 
..........................................................
 
75
22.2.5
Categorization of Risk Levels and Color Code Convention .......................
 
78
22.2.6
Description of the Coal Property ..............................................................
 
78
22.2.7
Summary of Residual Risk Ratings ............................................................
 
79
22.2.8
Risk Factors ...............................................................................................
 
79
22.2.8.1
Geological and Coal Resource
 
...................................................
 
80
22.2.8.2
Environmental
 
...........................................................................
 
80
22.2.8.3
Regulatory Requirements .........................................................
 
81
22.2.8.4
Market and Transportation
 
......................................................
 
81
22.2.8.5
Mining Plan ...............................................................................
 
83
23
Recommendations ................................................................
 
................................
 
..............
 
87
24
References ................................................................
 
................................
 
..........................
 
87
25
Reliance on Information Provided by the Registrant ................................
 
............................ 87
F
IGURES
(
IN
R
EPORT
)
Figure 1-1:
 
Coronado Logan Property Location Map..............................................................................
 
2
Figure 1-2:
 
CAPEX
 
....................................................................................................................................
 
6
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
Figure 1-3:
 
OPEX
 
......................................................................................................................................
 
7
Figure 1-4:
 
Sensitivity of NPV
 
................................................................................................................
 
11
Figure 3-1:
 
Logan Property Location
 
.....................................................................................................
 
14
Figure 6-1:
 
Coal Basins & Logan Property Location ..............................................................................
 
19
Figure 6-2:
 
Logan Stratigraphic Column................................................................................................
 
21
Figure 7-1:
 
Logan Cross-Section
 
............................................................................................................
 
23
Figure 11-1:
 
Histogram of the Total
 
Seam Thickness for the No. 2 Gas Seam Present in the Logan
Complex ..............................................................................................................................
 
32
Figure 11-2:
 
Scatter plot of the Total
 
Seam Thickness for the No. 2 Gas Seam Present in the Logan
Complex ..............................................................................................................................
 
32
Figure 11-3: Variogram
 
of the Total
 
Seam Thickness for the No. 2 Gas Seam
 
Present in the Logan
Complex ..............................................................................................................................
 
33
Figure 11-4: Result of DHSA for the No. 2 Gas Seam Present in the Logan Complex ...........................
 
34
Figure 11-5:
 
Results of Initial Economic Assessment
 
............................................................................
 
36
Figure 15-1:
 
Logan Surface Facilities
 
.....................................................................................................
 
57
Figure 18-1:
 
CAPEX
 
................................................................................................................................
 
63
Figure 19-1:
 
Cash Costs per Tonne
 
.......................................................................................................
 
68
Figure 19-2:
 
Sensitivity of NPV
 
..............................................................................................................
 
71
T
ABLES
(
IN
R
EPORT
)
Table 1-1:
 
Coal Resources Summary as of December 31, 2022 (Mt) .....................................................
 
4
Table 1-2:
 
Coal Summary (ROM Basis (Moist)) as of December 31, 2022 (Mt) .....................................
 
5
Table 1-3:
 
Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022 (Mt) ...............
 
5
Table 1-4:
 
Life-of-Mine Tonnage,
 
P&L before Tax,
 
and EBITDA ($000)
 
..................................................
 
8
Table 1-5:
 
Project Cash Flow Summary ($000)
*
 
......................................................................................
 
9
Table 2-1:
 
Information Provided to MM&A by Coronado ....................................................................
 
13
Table 11-1:
 
General Reserve & Resource Criteria ................................................................................
 
29
Table 11-2:
 
DHSA Results Summary for Radius from a Central Point
 
..................................................
 
34
Table 11-3:
 
Coal Resources Summary as of December 31, 2022 (Mt) .................................................
 
35
Table 11-4:
 
Results of Initial Economic Assessment
 
.............................................................................
 
36
Table 12-1:
 
Coal Reserves Summary (ROM Basis (Moist)) as of December 31, 2022 (Mt)
 
..................
 
42
Table 12-2:
 
Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022 (Mt) ...........
 
42
Table 13-1:
 
Underground Summary of Production by Year
 
(000)
 
........................................................
 
53
Table 13-2:
 
Surface Summary of Production by Year
 
(000)
 
..................................................................
 
54
Table 13-3:
 
Highwall Summary of Production by Year
 
(000)
 
................................................................
 
55
Table
 
16-1:
 
Quality Specifications by Product ......................................................................................
 
58
Table 17-1:
 
Logan Mining Permits ........................................................................................................
 
61
Table 18-1:
 
Estimated Coal Production Taxes
 
and Sales Costs
 
.............................................................
 
65
Table 18-2:
 
Logan Operating Costs .......................................................................................................
 
65
Table 19-1:
 
Life-of-Mine Tonnage,
 
P&L before Tax,
 
and EBITDA ($000)
 
..............................................
 
68
Table 19-2:
 
Summary of Logan Key Financial Performance Metrics (2023-2030) ...............................
 
69
Table 19-3:
 
Project Cash Flow Summary ($000)
*
 
..................................................................................
 
70
Table 22-1:
 
Probability Level Table .......................................................................................................
 
75
Table 22-2:
 
Consequence Level Table
 
...................................................................................................
 
76
Table 22-3:
 
Risk Matrix .........................................................................................................................
 
78
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
9
Table 22-4:
 
Risk Assessment Matrix .....................................................................................................
 
79
Table 22-5:
 
Geological and Coal Resource Risk Assessment (Risks 1 and 2)
 
........................................
 
80
Table 22-6:
 
Environmental (Risks 3 and 4) ...........................................................................................
 
81
Table 22-7:
 
Regulatory Requirements (Risk 5) .....................................................................................
 
81
Table 22-8:
 
Market and Transportation
 
(Risk 6)
 
...................................................................................
 
83
Table 22-9:
 
Market and Transportation
 
(Risk 7)
 
...................................................................................
 
83
Table 22-10:
 
Methane Management (Risk 8) .......................................................................................
 
84
Table 22-11:
 
Mine Fires (Risk 9)
 
............................................................................................................
 
85
Table 22-12:
 
Highwall Failure (Risk 10)
 
.................................................................................................
 
85
Table 22-13:
 
Availability of Supplies and Equipment (Risk 11)
 
.............................................................
 
86
Table 22-14:
 
Labor – Work Stoppage (Risk 12)
 
.....................................................................................
 
86
Table 22-15:
 
Labor – Retirement (Risk 13) ...........................................................................................
 
86
Table 25-1:
 
Information from Registrant
 
Relied Upon by MM&A .......................................................
 
87
Appendices
A ..........................................................................................................................
 
MM&A Qualifications
B ....................................................................................................................................................
 
Maps
C ................................................................................................................................
 
Glossary of Terms
D
 
.....................................................
 
Initial Economic Assessment for Resources Exclusive
 
of Reserves
E
 
.........................................................................................................................................
 
JORC Table
 
1
 
 
ex963p2i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
1
Executive Summary
1.1
Property Description
Coronado Global Resources
 
Inc. (
Coronado
)
authorized Marshall Miller
 
& Associates, Inc.
 
(
MM&A
)
to prepare this
 
Technical Report Summary (TRS) of
 
its controlled coal
 
resources and reserves
 
located
at the
Logan County
 
Complex (
Logan
)
 
in Boone, Logan
 
and Wyoming
 
Counties, West
 
Virginia (the
Property
).
 
An updated
 
TRS was
 
prepared in
 
February 2023
 
due to
 
material differences
 
in the
 
key
financial modifying factors including coal
 
sales price assumptions, operating costs and
 
capital costs
from
 
December
 
31,
 
2021
 
to
 
December
 
31,
 
2022.
 
Coal
 
sales
 
price
 
assumptions
 
are
 
discussed
 
in
Sections 12
 
and 16
 
of the TRS,
 
while operating
 
costs and
 
capital costs
 
are discussed in
Sections 18
and
 
19
 
of
 
the
 
TRS.
 
The
 
report
 
provides
 
a
 
statement
 
of
 
coal
 
resources
 
and
 
coal
 
reserves
 
for
Coronado,
 
as defined
 
under the
Australasian Code
 
for Reporting
 
of Exploration
 
Results, Mineral
Resources
 
and
 
Ore
 
Reserves
(
JORC
 
Code
)
 
as
 
well
 
as
 
under
 
Subpart
 
1300
 
of
 
Regulation
 
S-K
(Regulation
 
S-K
 
1300)
 
promulgated
 
by
 
the
United
 
States
 
Securities
 
and
 
Exchange
 
Commission
(
SEC
)
.
 
This report was also
 
prepared in accordance with the
Australasian Code for Public
 
Reporting
of Technical
 
Assessments and Valuations of Mineral Assets
(
VALMIN Code
).
Coal
 
resources
 
and
 
coal
 
reserves
 
are
 
herein
 
reported
 
in
 
metric
 
units
 
of
 
measurement
 
and
 
are
rounded to millions of metric tonnes (
Mt
).
Surface facilities for the operations are located along Buffalo Creek
 
and a
CSX Corporation (
CSX
)
 
rail
line about
 
21 kilometers
 
north-northeast
 
of Man,
 
West
 
Virginia
 
(see
Figure 1-1
).
 
The Property
 
is
composed
 
of
 
13,183
 
total
 
hectares,
 
13,114
 
of
 
which
 
are
 
leased
 
from
 
private
 
landholders
 
under
approximately 15
 
individual leases, and 69 hectares are
 
owned by Coronado.
 
Subject to Coronado
exercising
 
its renewal
 
rights thereunder,
 
a majority of
 
the leases, covering
 
a majority of
 
the Logan
reserves, expire upon exhaustion
 
of the relevant coal
 
reserves, which is expected to
 
occur in 2056.
 
One
 
lease
 
expires
 
in
 
2032;
 
however,
 
Coronado
 
is
 
projected
 
to
 
have
 
previously
 
exhausted
 
the
reserves covered thereby.
 
 
ex963p2i0 ex963p11i1
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Figure 1-1:
 
Coronado Logan Property Location Map
1.2
Ownership
The Logan properties started mining in 1945 by
Lorado Mining Company
.
 
The properties
were sold
to
Buffalo Mining Company
 
in 1964 and then
 
to
Pittston Coal Company (
Pittston
)
 
in 1971.
 
Pittston
operated the properties until the early
 
1990’s when it idled the mine
 
complex and then in
 
2004 sold
them to
Addington Resources
.
 
Production resumed
 
in 2005.
 
Imagin Natural
 
Resources
 
acquired
the properties in 2007 and
 
then sold them to
Cleveland-Cliffs Inc. (
Cliffs
)
 
in 2011, which in
 
turn sold
the properties to Coronado in 2014.
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
1.3
Geology
 
The
 
coal-bearing
 
formation
 
of
 
interest
 
at
 
Logan
 
is
 
primarily
 
the
 
Kanawha
 
Formation
 
of
 
Lower
Pennsylvanian
 
System,
 
which
 
comprises
 
a
 
major
 
portion
 
of
 
the
 
exposed
 
ridges.
 
The
 
Kanawha
Formation is
 
a coal bearing
 
sequence of sandstones,
 
siltstones, shales,
 
and mudstones with
 
minor
occurrences of siderite, limestone and flint clay.
 
Coronado
mines
 
several
 
horizons
 
within
 
the
 
Kanawha
 
formation.
 
The
 
horizons
 
are
 
as
 
follows:
 
Buffalo Creek, Upper Clarion
 
Rider,
 
Clarion, Lower Clarion, Upper Stockton, Lower
 
Stockton, Upper
Coalburg, Lower
 
Coalburg, Lower
 
Dorothy,
 
Upper Winifrede,
 
Lower Winifrede,
 
Chilton-A, Chilton,
Upper
 
Cedar
 
Grove,
 
Middle
 
Cedar
 
Grove,
 
Lower
 
Cedar
 
Grove,
 
2
 
Gas,
 
Upper
 
Powellton,
 
Lower
Powellton,
 
Eagle,
 
and Lower
 
War
 
Eagle.
 
Operations
 
at the
 
Logan
 
Mine Complex
 
extract
 
multiple
coal seams by both underground and surface mining methods.
1.4
Exploration Status
The Property has been extensively explored, largely by drilling with continuous coring methods and
rotary
 
drilling,
 
often
 
supported
 
by
 
downhole
 
geophysical
 
methods.
 
In
 
addition
 
to
 
exploration
means, coal
 
measurements from
 
mine exposures
 
have supplemented
 
the database.
 
The majority
of the data was acquired or
 
generated by previous owners of the Property.
 
These sources comprise
the primary
 
data
 
used in
 
the evaluation
 
of the
 
coal
 
resources
 
and coal
 
reserves
 
on the
 
Property.
 
MM&A examined
 
the data
 
available for
 
the evaluation
 
and incorporated
 
all pertinent
 
information
into this TRS.
 
Where data were anomalous or not
 
representative, that data was not honored within
the digital databases and for subsequent processing by MM&A.
 
Ongoing
 
exploration
 
has
 
been
 
carried
 
out
 
by
 
Coronado
 
since
 
acquiring
 
the
 
Logan
 
Complex.
 
The
Coronado acquired exploration data
 
has been consistent with past drilling activities.
1.5
Operations and Development
As of December 31, 2022, underground mine operations were active at the Lower War Eagle,
 
Eagle
No. 1
 
and Muddy Bridge
 
Mines with three,
 
three or
 
two active
 
mining sections, respectively
 
using
the
 
room-and-pillar
 
method.
 
In
 
addition,
 
Coronado
 
operates
 
a
 
single
 
active
 
underground
 
room-
and-pillar
 
section
 
in
 
the
 
North
 
Fork
 
Winifrede
 
Mine.
 
Annual
 
deep
 
mine
 
production
 
peaks
 
at
approximately
 
2.3 Mt
 
in 2028.
 
One active
 
surface mine,
 
Toney
 
Fork, was
 
also operating.
 
Surface
production is
 
projected to
 
peak at
 
0.6 Mt
 
in 2028.
 
Highwall miner
 
production is
 
also projected
 
to
resume
 
in 2023
 
with a
 
peak in
 
2028 at
 
0.44 Mt.
 
Overall
 
production will
 
continue until
 
2056 with
peak production occurring in 2028 at 3.3 Mt.
The Logan
 
County Complex includes
 
the Saunders
 
Preparation Plant
 
in addition to
 
the mines.
 
The
plant site includes raw coal storage, clean coal storage, a railroad loadout, and refuse disposal area.
 
The plant has a feed rate capacity
 
of 1,088 raw tonnes per hour.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
1.6
Mineral Resource
Mineral
 
resources,
 
representing
 
in-situ
 
coal
 
from
 
a
 
portion
 
of
 
which
 
reserves
 
are
 
derived,
 
are
presented below.
 
A coal resource estimate, summarized
 
in
Table 1-1
, was prepared as
 
of December
31, 2022, for property controlled by Coronado.
Table 1-1:
 
Coal Resources Summary as of December 31, 2022 (Mt)
 
Coal Resource (Dry Tonnes, In Situ, MT)
Resource Quality (Dry)
Area
Measured
Indicated
Inferred
Total
Ash%
Sulfur%
VM%
Inclusive of Reserves
127.2
40.0
0.0
167.2
24
1.0
28
Exclusive of Reserves
45.2
37.0
3.4
85.6
Total 12/31/2022
172.5
77.0
3.4
252.8
Note:
 
Resource tonnes are inclusive of reserve tonnes since they include the in-situ tonnes from which recoverable coal reserves are
derived.
Note 2:
 
Coal resources are reported on a dry basis.
 
Surface moisture and inherent moisture are excluded.
Note 3: The Property has 82.2 Mt of dry, in-place measured and indicated resource tonnes exclusive of reserves as of December 31, 2022.
1.7
Mineral Reserve
Reserve tonnage
 
estimates provided
 
herein report
 
coal reserves
 
derived from
 
the in-situ resource
tons
 
presented
 
in
Table
 
1-1
,
 
and
 
not
 
in
 
addition
 
to
 
coal
 
resources.
 
Proven
 
and
 
probable
 
coal
reserves
 
were
 
derived
 
from
 
the
 
defined
 
coal
 
resource
 
considering
 
relevant
 
mining,
 
processing,
infrastructure,
 
economic
 
(including
 
estimates
 
of
 
capital,
 
revenue,
 
and
 
cost),
 
marketing,
 
legal,
environmental,
 
socio-economic
 
and regulatory
 
factors.
 
The
 
Resource
 
estimate
 
has been
 
used
 
as
the basis
 
for this Reserve
 
calculation, which utilizes
 
a reasonable Preliminary
 
Feasibility Study, a Life-
of Mine (
LOM
) Mine Plan and practical recovery factors.
 
Production modeling was completed with
an effective
 
start
 
date
 
of October
 
1, 2022.
 
Additions and
 
depletion have
 
been used
 
to
 
bring the
Reserve estimate forward
 
to December 31, 2022.
Factors
 
that would
 
typically preclude
 
conversion
 
of a
 
coal resource
 
to coal
 
reserve, which
 
include
the following:
 
inferred resource
 
classification; absence
 
of coal quality;
 
poor mine recovery;
 
lack of
access; geological
 
encumbrances
 
associated
 
with
 
overlying
 
and underlying
 
strata;
 
seam thinning;
structural
 
complication;
 
and
 
insufficient
 
exploration,
 
have
 
all
 
been
 
considered.
 
Reserve
consideration
 
excludes
 
those
 
portions
 
of
 
the
 
resource
 
area
 
which
 
exhibit
 
the
 
aforementioned
geological
 
and
 
operational
 
encumbrances.
 
Coal
 
reserves
 
are
 
presented
 
on
 
a
 
run-of-mine
 
(
ROM
)
basis in
Table 1-2.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Table 1-2:
 
Coal Summary (ROM Basis (Moist)) as of December 31, 2022 (Mt)
 
Demonstrated Coal Reserves (Mt, Moist ROM)
Quality (Dry)
 
By Reliability Category
By Mining Type
By Control Type
Area / Mine
Proved
Probable
Total
Surface
UG
Owned
Leased
Ash
Sulfur
Vol
Logan Mine Complex
101.4
36.7
138.1
37.3
100.8
0.0
138.1
51
0.9
19
Proven and
 
probable coal
 
reserve were
 
derived from
 
the defined in-situ
 
coal resource
 
considering
relevant
 
processing,
 
economic
 
(including
 
technical
 
estimates
 
of
 
capital,
 
revenue
 
and
 
cost),
marketing, legal,
 
environmental, socioeconomic,
 
and regulatory factors.
 
The proven and
 
probable
coal reserves on the Property are summarized below in
Table 1-3.
Table 1-3:
 
Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022 (Mt)
 
Demonstrated Coal Reserves (Wet Tons,
 
Washed or Direct Shipped, MT)
Quality (Dry Basis)
 
By Reliability Category
By Mining Type
By Control Type
Property
Proven
Probable
Total
Surface
UG
Owned
Leased
Ash%
Sulfur%
VM%
Logan County Complex
53.3
17.4
70.6
32.5
38.1
0.0
70.6
8
0.9
36
Note: Marketable reserve tonnes are reported on a moist basis, including a combination of surface and inherent moisture.
 
The combination of
surface and inherent moisture is modeled between 4.5 and 6-percent, depending upon mining method.
 
Actual product moisture is
dependent upon multiple geological factors, operational factors, and product contract specifications and can exceed 8-percent.
 
As such, the
modeled moisture values provide a level of conservatism for reserve reporting.
In summary, Coronado controls a total of 70.6
 
Mt (moist basis) of
 
marketable coal reserves at Logan
as of
 
December 31,
 
2022.
 
Of that
 
total, 75
 
percent
 
are proven,
 
and 25
 
percent
 
are probable.
 
All
70.6
 
Mt
 
are
 
leased
 
coal
 
reserves
 
and
 
are
 
assigned.
 
Approximately
 
61.6
 
Mt
 
of
 
reserves
 
are
considered suitable
 
for the
 
metallurgical coal
 
market and
 
9.0 Mt are
 
projected to
 
be sold into
 
the
thermal coal market.
 
1.8
Capital Summary
Coronado provided MM&A with an inventory of operating equipment available
 
at Logan.
 
MM&A’s
capital schedules
 
assume that
 
major equipment
 
rebuilds occur
 
over the
 
course of
 
each machine’s
remaining
 
assumed
 
operating
 
life.
 
Replacement
 
equipment
 
was
 
scheduled
 
based
 
on
 
MM&A’s
experience and knowledge
 
of mining equipment and
 
industry standards with
 
respect to the
 
useful
life of
 
such equipment.
 
A summary of
 
the estimated
 
capital for
 
the Property
 
is provided
 
in
Figure
1-2
 
below.
 
 
ex963p2i0 ex963p15i1
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
Figure 1-2:
 
CAPEX
1.9
Operating Costs
Coronado
 
provided
 
historical
 
and
 
preliminary
 
5-year
 
projections
 
of
 
operating
 
costs
 
for
 
its
 
active
mines
 
for
 
MM&A’s
 
review.
 
MM&A
 
used
 
the
 
historical
 
and/or
 
budget
 
cost
 
information
 
as
 
a
reference and
 
developed personnel schedules for
 
each mine.
 
Hourly labor rates
 
and salaries were
based upon
 
information
 
contained
 
in Coronado’s
 
financial
 
summaries.
 
Fringe benefit
 
costs
 
were
developed
 
for
 
vacation
 
and
 
holidays,
 
federal
 
and
 
state
 
unemployment
 
insurance,
 
retirement,
workers’ compensation and pneumoconiosis,
 
casualty and life insurance, healthcare and bonuses.
For
 
the
 
underground
 
operations,
 
a
 
cost
 
factor
 
for
 
mine
 
supplies
 
was
 
developed
 
that
 
relates
expenditures
 
to
 
mine
 
advance
 
rates
 
for
 
roof
 
control
 
costs
 
and
 
other
 
mine
 
supply
 
costs
 
at
underground mines.
 
Other factors were developed for maintenance and repair costs, rentals, mine
power,
 
outside services and other direct mining costs.
 
Surface mine direct operating costs were developed
 
as a function
 
of overburden ratio for repair and
maintenance supplies, diesel fuel, explosives and blasting, and miscellaneous supplies
 
and services.
Operating costs for highwall mines are based
 
on costs per ROM tonne estimates.
Operating
 
costs
 
factors
 
were
 
also
 
developed
 
for
 
the
 
coal
 
preparation
 
plant
 
processing,
 
refuse
handling, coal loading, property taxes, and insurance and bonding.
 
 
ex963p2i0 ex963p16i1
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
Appropriate royalty rates were
 
assigned for production from leased coal lands and sales taxes were
calculated
 
for
 
state
 
severance
 
taxes,
 
the
 
federal
 
black
 
lung
 
excise
 
tax,
 
and
 
federal
 
and
 
state
reclamation fees.
A summary of the projected operating costs for the Property
 
is provided in
Figure 1-3
.
Figure 1-3:
 
OPEX
1.10
Economic Evaluation
The pre-feasibility financial
 
model prepared for
 
this TRS
 
was developed to
 
test the
 
economic viability
of
 
the
 
coal
 
resource
 
area.
 
The
 
results
 
of
 
this
 
financial
 
model
 
are
 
not
 
intended
 
to
 
represent
 
a
bankable
 
feasibility
 
study,
 
required
 
for
 
financing
 
of
 
any
 
current
 
or
 
future
 
mining
 
operations
contemplated
 
for the Coronado
 
properties, but are
 
intended to establish
 
the economic viability
 
of
the
 
estimated
 
coal
 
reserves.
 
Cash
 
flows
 
are
 
simulated
 
on
 
an
 
annual
 
basis
 
in
 
nominal
 
dollars
assuming a 2% inflation rate based
 
on projected production from the coal
 
reserves.
 
The discounted
cash flow analysis presented herein is based on an effective
 
date of January 1, 2023.
 
On an un-levered basis, the net
 
present value (
NPV
) of the project cash flow
 
after taxes represents
the Enterprise
 
Value of
 
the project.
 
The project cash
 
flow,
 
excluding debt
 
service, is calculated
 
by
subtracting direct
 
and indirect
 
operating expenses
 
and capital
 
expenditures from
 
revenue.
 
Direct
costs
 
include
 
labor,
 
operating
 
supplies,
 
maintenance
 
and
 
repairs,
 
facilities
 
cost
 
for
 
materials
handling,
 
coal
 
preparation,
 
refuse
 
disposal,
 
coal
 
loading,
 
reclamation
 
and
 
general
 
and
administrative costs.
 
Indirect costs include statutory and legally agreed
 
upon fees related to direct
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
extraction
 
of
 
the
 
mineral.
 
The
 
indirect
 
costs
 
are
 
the
 
Federal
 
black
 
lung
 
tax,
 
Federal
 
and
 
State
reclamation taxes, property
 
taxes, coal production royalties,
 
and income taxes.
 
Table
 
1-4
 
shows LOM tonnage, profit
 
& loss (
P&L
), and earnings before income tax,
 
depreciation &
amortization (
EBITDA
) for Logan.
Table 1-4:
 
Life-of-Mine Tonnage,
 
P&L before Tax,
 
and EBITDA ($000)
 
LOM
LOM
P&L
LOM
EBITDA
 
Tonnes
Pre-Tax P&L
Per Tonne
EBITDA
Per Tonne
Deep Mines
 
 
 
 
 
Camp Br Chilton
1,607
$21,157
$13.16
$51,064
$31.77
Eagle No. 1 (Toney
 
Fork)
11,806
$18,727
$1.59
$220,119
$18.65
Elk Lick Chilton
3,809
$76,902
$20.19
$146,959
$38.58
Lower Powellton
5,095
$112,692
$22.12
$224,168
$44.00
Lower War Eagle
6,544
$102,095
$15.60
$227,269
$34.73
Powellton No. 1
3,629
$52,199
$14.38
$122,643
$33.80
Muddy Br No.2 Gas
3,647
$166,946
$45.77
$212,139
$58.16
Upper Winifrede
1,794
$61,150
$34.09
$95,271
$53.12
Winifrede (Chilton Rider)
219
$9,021
$41.19
$12,795
$58.42
Consolidated Deep Mines
38,150
$620,890
$16.27
$1,312,426
$34.40
 
Surface Mines
Toney Fork Surf
6,338
$106,288
$16.77
$245,407
$38.72
Buffalo Cr South Area
7,990
$27,941
$3.50
$203,185
$25.43
Sugar Camp Area 1
4,911
$(100,944)
$(20.55)
$48,015
$9.78
Surface Mines Consolidated
19,239
$33,285
$1.73
$496,606
$25.81
 
HWM Operations
Toney Fork HWM
4,919
$330,409
$67.17
$361,920
$73.57
Buffalo Cr South HWM
7,004
$434,033
$61.97
$474,395
$67.73
Sugar Camp HWM
1,314
$82,843
$63.05
$91,260
$69.45
HWM Consolidated
13,237
$847,285
$64.01
$927,575
$70.07
 
Grand Total
70,626
$1,501,460
$21.26
$2,736,607
$38.75
* The Financial model includes 0.001 million tonnes of inferred coal production.
 
Inferred coal represents
0.000001% of the total production, and none of this coal was included in the estimate of reserves.
As
 
shown
 
in
Table
 
1-4,
 
the
 
Logan
 
operations
 
show
 
positive
 
EBITDA
 
over
 
the
 
LOM.
 
Overall,
 
the
Coronado consolidated operations show positive LOM P&L and
 
LOM EBITDA of $1.5 billion
 
and $2.7
billion, respectively.
 
Coronado’s consolidated
 
Logan cash flow summary in nominal dollars assuming a 2% inflation rate,
excluding debt service, is shown in
Table 1-5
 
below.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
9
Table 1-5:
 
Project Cash Flow Summary ($000)
*
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
Total
2023
2024
2025
2026
2027
Production & Sales tonnes
70,626
2,215
2,444
2,730
2,614
2,524
Total Revenue
$11,449,478
$403,255
$343,593
$366,750
$356,408
$349,974
EBITDA
$2,736,607
$154,435
$79,831
$67,982
$64,942
$48,930
Net Income
$1,271,269
$93,455
$33,975
$22,180
$21,044
$7,422
Net Cash Provided by Operating Activities
$2,455,780
$98,886
$84,666
$64,481
$60,927
$49,298
Purchases of Property, Plant, and
 
Equipment
$(1,212,814)
$(64,541)
$(46,249)
$(35,126)
$(24,721)
$(19,540)
Net Cash Flow
$1,242,966
$34,345
$38,417
$29,354
$36,206
$29,758
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2028
2029
2030
2031
2032
2033
Production & Sales tonnes
3,315
3,138
3,052
2,987
2,862
2,833
Total Revenue
$469,730
$441,352
$437,982
$436,621
$425,513
$428,277
EBITDA
$134,632
$96,812
$86,647
$88,298
$85,099
$81,695
Net Income
$76,870
$40,290
$35,152
$37,612
$33,266
$22,374
Net Cash Provided by Operating Activities
$102,420
$94,319
$82,136
$80,835
$79,110
$77,163
Purchases of Property, Plant, and
 
Equipment
$(54,676)
$(76,748)
$(30,875)
$(25,919)
$(58,356)
$(77,043)
Net Cash Flow
$47,743
$17,571
$51,261
$54,916
$20,754
$119
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2034
2035
2036
2037
2038
2039
Production & Sales tonnes
2,872
2,714
2,739
2,785
2,969
2,783
Total Revenue
$445,485
$422,500
$431,983
$440,845
$480,253
$458,789
EBITDA
$108,745
$74,857
$97,015
$103,374
$125,905
$107,907
Net Income
$53,277
$22,619
$43,055
$45,843
$62,109
$46,564
Net Cash Provided by Operating Activities
$92,575
$73,923
$84,785
$93,567
$110,105
$102,650
Purchases of Property, Plant, and
 
Equipment
$(60,090)
$(30,525)
$(49,809)
$(65,949)
$(56,676)
$(42,223)
Net Cash Flow
$32,485
$43,398
$34,975
$27,618
$53,429
$60,427
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2040
2041
2042
2043
2044
2045
Production & Sales tonnes
2,733
2,519
2,100
2,214
1,611
1,476
Total Revenue
$459,598
$431,586
$365,532
$393,908
$289,596
$269,978
EBITDA
$104,671
$94,788
$81,444
$105,980
$58,696
$83,754
Net Income
$47,235
$41,064
$39,833
$60,889
$23,010
$51,731
Net Cash Provided by Operating Activities
$96,543
$88,891
$75,724
$90,314
$63,837
$71,484
Purchases of Property, Plant, and
 
Equipment
$(29,343)
$(33,901)
$(27,895)
$(23,194)
$(29,298)
$(22,073)
Net Cash Flow
$67,200
$54,990
$47,828
$67,120
$34,540
$49,411
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2046
2047
2048
2049
2050
2051
Production & Sales tonnes
1,057
1,057
1,053
1,053
1,057
1,061
Total Revenue
$194,175
$198,147
$201,437
$205,554
$210,544
$215,652
EBITDA
$52,251
$53,459
$54,370
$59,571
$58,316
$59,618
Net Income
$28,842
$28,388
$27,184
$31,758
$28,651
$30,020
Net Cash Provided by Operating Activities
$52,854
$48,225
$49,193
$53,061
$49,045
$52,351
Purchases of Property, Plant, and
 
Equipment
$(18,702)
$(21,272)
$(25,945)
$(30,072)
$(22,359)
$(22,221)
Net Cash Flow
$34,152
$26,953
$23,248
$22,990
$26,686
$30,131
 
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
10
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2052
2053
2054
2055
2056
2057
Production & Sales tonnes
1,057
1,049
1,037
677
242
-
Total Revenue
$219,229
$222,017
$223,966
$151,873
$57,377
$-
EBITDA
$71,599
$60,514
$60,792
$48,780
$20,900
$-
Net Income
$45,345
$29,161
$30,508
$22,011
$9,180
$(339)
Net Cash Provided by Operating Activities
$60,653
$56,148
$54,570
$47,692
$20,671
$(3,597)
Purchases of Property, Plant, and
 
Equipment
$(24,540)
$(27,137)
$(12,933)
$(11,318)
$(11,544)
$-
Net Cash Flow
$36,113
$29,011
$41,637
$36,374
$9,127
$(3,597)
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2058
2059
2060
2061
2062
2063
Production & Sales tonnes
-
-
-
-
-
-
Total Revenue
$-
$-
$-
$-
$-
$-
EBITDA
$-
$-
$-
$-
$-
$-
Net Income
$(174)
$(89)
$(46)
$(0)
$(0)
$(0)
Net Cash Provided by Operating Activities
$(1,835)
$(936)
$(954)
$-
$-
$-
Purchases of Property, Plant, and
 
Equipment
$-
$-
$-
$-
$-
$-
Net Cash Flow
$(1,835)
$(936)
$(954)
$-
$-
$-
* The Financial model includes 0.001 million tonnes of inferred coal production.
 
Inferred coal represents 0.000001% of the total
production, and none of this coal was included in the estimate of reserves.
Consolidated cash flows are driven
 
by annual sales
 
tonnage, which at steady-state level ranges from
a peak of 3.3 million
 
tonnes in 2028 to
 
a low of 1.0 million tonnes
 
in 2054.
 
Projected consolidated
revenue ranges from $151.9 million to $480.3 million
 
at a steady state.
 
Revenue totals $11.4 billion
for the project’s life.
Consolidated cash flow from operations is positive throughout the projected operating period, with
the
 
exception
 
of post
 
-production
 
years,
 
due to
 
end-of-mine
 
reclamation
 
spending.
 
Consolidated
cash flow from operations
 
peaks at $110.1 million in
 
2038 and totals $2.5 billion over
 
the project’s
life.
 
Capital
 
expenditures
 
total
 
$190.2
 
million
 
from
 
2023
 
through
 
2027 and
 
$1.2
 
billion
 
over
 
the
project’s life.
 
1.10.1
Discounted Cash Flow Analysis
Cash flow after
 
tax, but before
 
debt service, generated
 
over the life
 
of the project
 
was discounted
to NPV
 
at a 10.0%
 
discount rate,
 
which represents
 
Coronado’s
 
estimate of
 
the nominal dollar,
 
risk
adjusted
 
weighted
 
average
 
cost
 
of
 
capital
 
(
WACC
)
 
for
 
likely
 
market
 
participants
 
if
 
the
 
subject
reserves were offered for sale.
 
On an un-levered basis,
 
the NPV of
 
the project cash
 
flows represents
the
 
Enterprise
 
Value
 
of
 
the
 
project
 
and
 
amounts
 
to
 
$366.6
 
million.
 
The
 
pre-feasibility
 
financial
model prepared for the
 
TRS was developed to
 
test the economic
 
viability of
 
each coal resource area.
 
The NPV estimate
 
was made for
 
the purpose of confirming
 
the economics for
 
classification of coal
reserves
 
and
 
not
 
for
 
purposes
 
of
 
valuing
 
Coronado
 
or
 
its
 
Logan
 
assets.
 
Mine
 
plans
 
were
 
not
optimized,
 
and
 
actual
 
results
 
of
 
the
 
operations
 
may
 
be
 
different,
 
but
 
in
 
all
 
cases,
 
the
 
mine
production plan assumes the properties are under competent management.
 
 
ex963p2i0
 
ex963p20i1
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
11
1.10.2
Sensitivity Analysis
Sensitivity
 
of the
 
NPV
 
results
 
to
 
changes
 
in
 
the
 
key
 
drivers
 
is presented
 
in the
 
chart below.
 
The
sensitivity study shows
 
the NPV at
 
the 10.0% discount
 
rate when
 
Base Case sales prices, operating
costs, and capital costs are increased and decreased in increments
 
of 5% within a +/- 15% range.
Figure 1-4:
 
Sensitivity of NPV
As shown, NPV is quite sensitive to changes in sales price and operating cost estimates, and slightly
sensitive to changes in capital cost estimates.
1.11
Permitting
Coronado has obtained all mining and
 
discharge permits to operate its active mines and
 
processing,
loadout
 
or
 
related
 
support
 
facilities.
 
MM&A
 
is
 
unaware
 
of
 
any
 
obvious
 
or
 
current
 
Coronado
permitting issues that are expected to prevent the issuance of future permits.
 
Logan, along with all
coal
 
producers,
 
is
 
subject
 
to
 
a
 
level
 
of
 
uncertainty
 
regarding
 
future
 
clean
 
water
 
permits
 
due
 
to
United States Environmental Protection Agency
(
EPA
)
 
and
United States Fish and Wildlife (
USFW
)
involvement with state
 
programs.
1.12
Conclusion and Recommendations
Sufficient data
 
has been obtained
 
through various
 
exploration and
 
sampling programs
 
and mining
operations
 
to
 
support
 
the
 
geological
 
interpretations
 
of
 
seam
 
structure
 
and
 
thickness
 
for
 
coal
horizons
 
situated
 
on
 
the
 
Logan
 
Property.
 
The
 
data
 
is
 
of
 
sufficient
 
quantity
 
and
 
reliability
 
to
reasonably support the coal resource and coal reserve estimates in this TRS.
 
 
ex963p2i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
12
The
 
geological
 
data
 
and
 
preliminary
 
feasibility
 
study,
 
which
 
consider
 
mining
 
plans,
 
revenue,
 
and
operating
 
and
 
capital
 
cost
 
estimates
 
are
 
sufficient
 
to
 
support
 
the
 
classification
 
of
 
coal
 
reserves
provided herein.
This geologic
 
evaluation conducted
 
in conjunction
 
with the
 
preliminary feasibility
 
study concludes
that the 70.6 Mt of marketable
 
coal reserves identified on the Property are
 
economically mineable
under
 
reasonable
 
expectations
 
of
 
market
 
prices
 
for
 
metallurgical
 
coal
 
products,
 
estimated
operation costs, and capital expenditures.
2
Introduction
2.1
Registrant and Terms
 
of Reference
This report
 
was prepared
 
for
 
the sole
 
use of
Coronado Global
 
Resources
 
Inc. (
Coronado
)
and
 
its
affiliated and
 
subsidiary companies and
 
advisors.
 
An updated TRS
 
was prepared
 
in February 2023
due
 
to
 
material
 
differences
 
in
 
the
 
key
 
financial
 
modifying
 
factors
 
including
 
coal
 
sales
 
price
assumptions, operating costs
 
and capital costs
 
from December 31,
 
2021 to
 
December 31,
 
2022.
 
Coal
sales price
 
assumptions are
 
discussed in
 
Sections 12
 
and 16
 
of the
 
TRS, while
 
operating
 
costs and
capital costs are discussed in
Sections 18 and
 
19
 
of the TRS.
 
The report provides a statement of coal
resources and coal reserves for Coronado, as defined under the
Australasian Code for Reporting of
Exploration
 
Results,
 
Mineral
 
Resources
 
and
 
Ore
 
Reserves
(
JORC
 
Code
)
 
as
 
well
 
as
 
under
 
Subpart
1300
 
of
 
Regulation
 
S-K
 
(Regulation
 
S-K
 
1300)
 
promulgated
 
by
 
the
United
 
States
 
Securities
 
and
Exchange
 
Commission (
SEC
)
.
 
This report
 
was also
 
prepared
 
in accordance
 
with the
Australasian
Code
 
for
 
Public
 
Reporting
 
of
 
Technical
 
Assessments
 
and
 
Valuations
 
of
 
Mineral
 
Assets
(
VALMIN
Code
).
The
 
report
 
provides
 
a
 
statement
 
of
 
coal
 
resources
 
and
 
coal
 
reserves
 
for
 
Coronado
 
at
 
Logan.
 
Exploration results and Resource
 
calculations were used as the basis for the mine planning and the
preliminary feasibility study completed to determine
 
the extent and viability of the reserve.
Coal
 
resources
 
and
 
coal
 
reserves
 
are
 
herein
 
reported
 
in
 
metric
 
units
 
of
 
measurement
 
and
 
are
rounded to millions of metric tonnes (
Mt
).
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
13
2.2
Information Sources
This TRS
 
is based
 
on information
 
provided by
 
Coronado and
 
reviewed by
 
MM&A. Sources
 
of data
and information are listed below in
Table 2-1
:
Table 2-1:
 
Information Provided to MM&A by Coronado
 
Category
Information Provided by Coronado
Report Section
Geological
Geologic data including digital databases
 
and original source data including
geologist logs, driller’s logs, geophysical
 
logs
9.1
Coal Quality
Database of coal quality information
 
supplemented with original source
laboratory sheets where available
10.1
Mining
Historical productivities and manpower
 
from operating and future
 
Coronado
mines
13.2, 13.4
Coal Preparation
Flow sheet and other information representing
 
current and future methods of
coal processing
 
14.1
Waste Disposal
Engineering data and estimates representing
 
remaining capacities for coarse
and fine coal waste disposal
17.2
Costs
Historical and budgetary operating
 
cost information used to derive
 
cost drivers
for reserve financial modeling
18.2
Economic
WACC and inflation rate
 
used in discounted cash flow analysis
19.1, 19.2, 19.3
Note: While the sources of data listed in Table 2-1 are not exhaustive, they represent a significant portion of information which supports this TRS.
 
MM&A reviewed the provided data and found it to be reasonable prior to incorporating it into the TRS.
 
The TRS contains “forward-looking
information” including forecasts of productivity and annual coal production, operating and capital cost estimates, coals sales price forecasts, the
assumption that Coronado will continue to acquire necessary permits, and other assumptions.
 
The TRS statements and conclusions are not a
guarantee of future performance and undue reliance should not be placed on them.
 
The ability of Coronado to recover the estimated coal reserves
is dependent on multiple factors beyond the control of MM&A including, but not limited to geologic factors, mining conditions, regulatory
approvals, and changes in regulations.
 
In all cases, the plans assume the Property is under competent management.
Coronado engaged MM&A to conduct a coal resource and reserve evaluation
 
of the Coronado coal
properties as of
 
September 30, 2022.
 
Additions (Property and
 
data) and depletion
 
(mine) have been
used to bring
 
the Resource and
 
Reserve estimates forward to December
 
31, 2022, the
 
effective date
of this TRS for Logan.
 
For the evaluation, the following tasks were to
 
be completed:
 
>
Conduct site visits of the mines and mine infrastructure facilities;
 
>
Process the information supporting the estimation of coal resources
 
and reserves into
geological models;
 
>
Develop life-of-reserve mine
 
(
LOM
) plans and financial models;
>
Hold discussions with Coronado company management; and
 
>
Prepare and issue a TRS providing a statement
 
of coal resources and reserves which would
include:
-
A description of the mines and facilities.
 
-
A description of the evaluation process.
-
An estimation of coal resources and reserves with compliance elements as stated
 
under the
JORC Code and the SEC Regulation S-K 1300.
 
 
ex963p2i0
 
ex963p23i0 ex963p23i2
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
14
2.3
Personal Inspections
MM&A is very familiar
 
with Logan, having provided
 
a variety of services in recent
 
years and one of
the QP’s involved in this TRS has conducted
 
multiple site visits.
3
Property Description
3.1
Location
The
 
Logan
 
County
 
Complex
 
is located
 
in
 
Logan, Boone,
 
and Wyoming
 
Counties
 
in southern
 
West
Virginia.
 
The Property
 
encompasses the
 
towns of
 
Lorado and
 
Pardee
 
in the
 
northern portion
 
and
Lacoma and Cyclone
 
in the
 
southern portion
 
(approximately 6 kilometers between the
 
northern and
southern
 
towns).
 
The
 
nearest
 
major
 
population
 
centers
 
are
 
Huntington,
 
West
 
Virginia
 
(145
kilometers northwest) and Charleston, West
 
Virginia (129 kilometers north-northeast).
Figure 3-1:
 
Logan Property Location
The Logan property is composed of
 
13,183 total leased and owned
 
hectares and is located in Logan,
Boone, and Wyoming
 
Counties.
 
The Property is located
 
on the following
United States
 
Geological
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
15
Survey
(
USGS
)
 
Quadrangles:
 
Lorado,
 
Mallory,
 
Amherstdale,
 
and
 
Oceana.
 
Current
 
mining
projections fall within portions of
 
all four quadrangles.
 
The coordinate system
 
and datum used for
the
 
model
 
of
 
the
 
Logan
 
County
 
Complex
 
and
 
the
 
subsequent
 
maps
 
were
 
produced
 
in
 
the
 
West
Virginia State Plane South system,
 
NAD 27.
3.2
Titles, Claims or Leases
The
 
Property
 
is
 
composed
 
of
 
13,183
 
total
 
hectares,
 
13,114
 
of
 
which
 
are
 
leased
 
from
 
private
landholders under approximately 15 individual
 
leases, and 69
 
hectares are owned by
 
Coronado. The
latest
 
Coronado
 
lease
 
of
 
45
 
hectares
 
was
 
obtained
 
in
 
2022.
 
Subject
 
to
 
Coronado
 
exercising
 
its
renewal rights thereunder, a majority
 
of the
 
leases, covering a
 
majority of
 
the Logan
 
reserves, expire
upon exhaustion of
 
the relevant coal
 
reserves, which is
 
expected to occur
 
in 2056.
 
One lease
 
expires
in
 
2032;
 
however,
 
Coronado
 
is
 
projected
 
to
 
have
 
previously
 
exhausted
 
the
 
reserves
 
covered
thereby.
 
MM&A has not carried out a separate title verification for the coal properties and has not
verified
 
leases,
 
deeds,
 
surveys,
 
or
 
other
 
property
 
control
 
instruments
 
pertinent
 
to
 
the
 
subject
resources.
 
Property tenure
 
was separately
 
reviewed by
 
Coronado’s
 
legal advisors.
 
Coronado has
represented
 
to MM&A
 
that it
 
controls
 
the mining
 
rights to
 
the reserves
 
as shown
 
on its
 
property
maps, and MM&A
 
has accepted these
 
as being a
 
true and accurate
 
depiction of the
 
mineral rights
controlled
 
by
 
Coronado.
 
The
 
TRS
 
assumes
 
the
 
properties
 
are
 
developed
 
under
 
responsible
 
and
experienced management.
3.3
Mineral Rights
Coronado supplied property control maps to MM&A related to properties for which mineral and/or
surface
 
property
 
are
 
controlled
 
by
 
Coronado.
 
While
 
MM&A
 
accepted
 
these
 
representations
 
as
being
 
true
 
and
 
accurate,
 
MM&A
 
has
 
no
 
knowledge
 
of
 
past
 
property
 
boundary disputes
 
or
 
other
concerns, through
 
past knowledge
 
of the
 
Property,
 
that would
 
signal concern
 
over future
 
mining
operations or development potential.
Property control
 
in Appalachia
 
can be
 
intricate.
 
Coal mining
 
properties are
 
typically composed
 
of
numerous property
 
tracts which
 
are owned
 
and/or leased
 
from both
 
land holding
 
companies and
private
 
individuals
 
or
 
companies.
 
It
 
is
 
common
 
to
 
encounter
 
severed
 
ownership,
 
with
 
different
entities
 
or individuals
 
controlling
 
the
 
surface
 
and mineral
 
rights.
 
Mineral
 
control
 
in the
 
region
 
is
typically characterized by leases or ownership of larger tracts of land,
 
with surface control generally
comprised of smaller tracts, particularly in developed areas.
Legal mining rights
 
may reflect
 
a combination of in
 
fee or mineral
 
ownership and in
 
fee or mineral
leases of coal lands
 
through various surface and mineral lease
 
agreements.
 
There is also a
 
relatively
small amount of area where the coal is partially-owned and/or partially leased on a limited number
of individual tracts.
 
Control
 
of
 
the
 
surface
 
property
 
is
 
necessary
 
to
 
conduct
 
surface
 
mining
 
but
 
is
 
not
 
necessary
 
to
conduct underground mining.
 
 
ex963p2i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
16
Upon acquisition of mineral
 
control for
 
desired coal seams
 
of surface-mineable economic
 
interest,
it
 
is
 
typical
 
practice
 
in
 
the
 
region
 
for
 
operators
 
to
 
delay
 
the
 
acquisition
 
of
 
surface
 
control
 
for
purposes
 
of
 
surface
 
mining
 
and
 
other
 
surface
 
development
 
until
 
plans
 
are
 
established
 
for
 
near-
future development.
 
Therefore, it is common for an
 
operator to control mineral for proposed areas
of
 
mining
 
for
 
which
 
they
 
have
 
not
 
established
 
the
 
legal
 
right
 
to
 
surface
 
mine
 
due
 
to
 
the
 
lack
 
of
surface
 
control.
 
Acquisition
 
of
 
these
 
rights
 
is
 
typically
 
delayed
 
in
 
order
 
to
 
limit
 
cost
 
and
 
royalty
payments
 
for
 
areas not
 
under consideration
 
for
 
near-future
 
development.
 
Coronado’s
 
executive
management
 
team
 
has
 
a
 
history
 
of
 
surface
 
mining
 
in
 
Central
 
Appalachia
 
and
 
has
 
conveyed
 
to
MM&A that it has been successful in acquiring surface rights where needed for past operations.
3.4
Encumbrances
No Title Encumbrances are known.
 
By assignment, MM&A did
 
not complete a query
 
related to Title
Encumbrances.
 
3.5
Other Risks
There
 
is
 
always
 
risk
 
involved
 
in
 
property
 
control.
 
As
 
is
 
common
 
practice,
 
Coronado,
 
and
 
its
predecessors, have
 
had their legal
 
teams examine
 
the deeds and title
 
control in order
 
to minimize
the risk.
 
Historically,
 
property control
 
has not
 
posed any
 
significant challenges
 
related
 
to Logan’s
operations.
 
4
Accessibility, Climate, Local Resources,
Infrastructure and Physiography
4.1
Topography,
 
Elevation, and Vegetation
Topography
 
of the area
 
surrounding the Logan County
 
Complex is typical
 
of the Central Appalachian
Plateau,
 
being
 
rugged
 
and
 
deeply
 
dissected
 
by
 
v-shaped
 
river
 
valleys,
 
and
 
generally
 
flanked
 
by
steeply sided upland regions,
 
with occasional gentle slopes in
 
select areas.
 
The drainage system
 
in
the region tends to be mostly dendritic in nature.
 
Surface elevations near the mine complex
 
range
from approximately
 
823 meters above
 
sea level in upland regions
 
to roughly 338 meters
 
at stream
level.
 
The Property
 
is moderately
 
to heavily
 
vegetated,
 
with oak-hickory
 
forests
 
as the
 
dominant
forest type
 
and northern hardwood forest
 
being less prominent.
 
The Property is not situated
 
near
any major urban centers, and the surrounding area is rural.
4.2
Access and Transport
Access to the Logan Mine property consists of primary,
 
secondary,
 
and unimproved roads, forming
a well-developed transportation network.
 
Highway 119 is the primary highway in the area running
southwest
 
to
 
northeast
 
from
 
the
 
Kentucky-West
 
Virginia
 
line
 
through
 
Mingo,
 
Logan,
 
and
 
Boone
Counties.
 
Secondary
 
roads
 
Route
 
16
 
and
 
Route
 
10
 
provide
 
the
 
most
 
direct
 
access
 
through
 
the
Property
 
running
 
east-west
 
across
 
the
 
leased
 
area.
 
Numerous
 
other
 
secondary
 
and
 
unimproved
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
17
roads provide direct access to the mine property, some being state-
 
and county-maintained.
 
These
roads typically stay
 
open throughout the year.
 
Additionally,
 
private access roads
 
to existing mines
provide
 
transport
 
corridors,
 
and
 
more
 
such roads
 
may
 
be
 
developed
 
as
 
needed.
 
The
 
Coronado-
owned Saunders
 
Preparation Plant
 
services the mines.
 
The ROM
 
coal is delivered
 
from the
 
Lower
War Eagle Mine
 
via overland conveyor,
 
all remaining production is or will
 
be delivered to the
 
plant
site by truck.
 
4.3
Proximity to Population Centers
 
The Logan property lies near the town of Lorado in Logan County, West Virginia, approximately 145
kilometers
 
southeast
 
of
 
Huntington,
 
West
 
Virginia
 
and
 
129
 
kilometers
 
south-southwest
 
of
Charleston,
 
West
 
Virginia.
 
As
 
of
 
the
 
2020
 
census,
 
Logan
 
County
 
had
 
a
 
population
 
of
 
32,567
residents, Boone County had 21,809 residents, and Wyoming
 
County had 21,382 residents.
 
4.4
Climate and Length of Operating Season
The region’s climate
 
is classified as humid, sub-tropical with four distinct seasons:
 
warm summers,
cold winters,
 
and moderate
 
fall and
 
spring seasons.
 
Precipitation in
 
the region
 
occurs throughout
the year with
 
the most rain falling
 
in spring and
 
the early months
 
of summer.
 
Average yearly rainfall
is 67.69 centimeters.
 
Summer months typically begin
 
in late May
 
and end in early
 
September and
range in
 
average
 
temperature from
 
53 to 84
 
degrees Fahrenheit
 
(or 11.6 to
 
28.9 degrees
 
Celsius).
 
Winters
 
typically
 
begin
 
in
 
mid
 
to
 
late
 
November
 
and
 
run
 
until
 
mid
 
to
 
late
 
March
 
with
 
average
temperatures
 
ranging
 
from
 
26
 
to
 
57
 
degrees
 
Fahrenheit
 
(or
 
-3.3
 
to
 
13.9
 
degrees
 
Celsius).
 
Precipitation
 
in the
 
winter
 
typically
 
comes
 
in the
 
form
 
of snowfall
 
or
 
as a
 
wintery
 
mix (sleet
 
and
snow) with
 
severe
 
snowfall events
 
occurring occasionally.
 
Seasonal variations
 
in climate
 
typically
do
 
not
 
affect
 
underground
 
mining
 
in
 
West
 
Virginia.
 
However,
 
weather
 
events
 
could
 
potentially
incumber surface mining
 
and preparation
 
plant operations
 
on a very limited
 
basis, typically lasting
less than a few days.
4.5
Infrastructure
The Logan Mine Complex has sources of water,
 
power,
 
personnel, and supplies readily available for
use.
 
Personnel have historically been sourced from
 
the surrounding communities in Logan, Boone,
Wyoming,
 
and Mingo
 
counties, and
 
have
 
proven
 
to be
 
adequate in
 
numbers
 
to operate
 
past and
current mines.
 
As mining is
 
common in
 
the surrounding
 
areas, the
 
workforce
 
is generally
 
familiar
with
 
mining
 
practices
 
and
 
is
 
comprised
 
of
 
a
 
strong
 
talent
 
pool
 
of
 
experienced
 
miners.
 
Water
 
is
sourced locally
 
from Buffalo
 
Creek Public
 
Service District and
 
electricity is sourced
 
from
American
Electric
 
Power
 
(
AEP
)
.
 
The
 
service
 
industry
 
in
 
the
 
areas
 
surrounding
 
the
 
mine
 
complex
 
has
historically
 
provided
 
supplies,
 
equipment
 
repairs
 
and
 
fabrication,
 
etc.
 
The
 
Coronado-owned
Saunders Preparation
 
plant services
 
the mines
 
and operates
 
at a
 
rate
 
of 952
 
tph.
 
The Coronado-
owned Elk Lick Loadout serves
 
as the primary means
 
of shipment and is
 
connected to a CSX rail line,
which either serves the domestic market directly, or transports the coal to the Pier 9 and Dominion
terminals at Norfolk, Virginia for overseas
 
shipment.
 
 
ex963p2i0
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
18
5
History
5.1
Previous Operation
The Logan County
 
properties were started in
 
1945 by
Lorado Mining Company
, were sold
 
to
Buffalo
Mining Company
 
in 1964 and then to
Pittston Coal Company (
Pittston
)
 
in 1971.
 
Pittston operated
the properties until the early 1990’s.
 
After being idle for a period, the properties were then sold to
Addington
 
Resources
 
in
 
2004.
 
Imagin
 
Natural
 
Resources
 
acquired
 
the
 
properties
 
in
 
2007,
 
and
subsequently sold them to Cliffs in 2011, which in turn sold the properties to Coronado in 2014.
Coronado produced approximately
 
1.8 Mt in 2016,
 
2.6 Mt in 2017, 2.6
 
Mt in 2018, 2.7 Mt
 
in 2019,
1.6 Mt in 2020, 1.9 Mt in 2021, and 2.1 Mt in 2022.
5.2
Previous Exploration
The
 
Properties
 
have
 
been
 
extensively
 
explored
 
by
 
subsurface
 
drilling
 
efforts
 
carried
 
out
 
by
numerous entities, most of which were completed prior to acquisition by Coronado.
Drill records
 
indicate that
 
independent contract
 
drilling operators
 
have
 
typically been
 
engaged
 
to
carry out drilling on the Properties.
 
Geophysical logging was typically performed by outside logging
firms.
 
MM&A, via
 
its Geophysical
 
Logging Systems
 
subsidiary,
 
has logged
 
a significant
 
number of
the past exploration holes and gas wells, and currently
 
logs most of the recently drilled holes.
6
Geological Setting, Mineralization and Deposit
6.1
Regional, Local and Property Geology
The
 
Property
 
lies in
 
the Central
 
Appalachian Coal
 
basin
 
in the
 
Appalachian Plateau
 
physiographic
province.
 
 
 
ex963p2i0 ex963p28i2 ex963p28i1
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
19
Figure 6-1:
 
Coal Basins & Logan Property Location
Coal deposits in
 
the eastern USA are
 
the oldest and most
 
extensively developed
 
in the country.
 
The
coal
 
deposits
 
on
 
the
 
Properties
 
are
 
Carboniferous
 
in
 
age,
 
being
 
of
 
the
 
Pennsylvanian
 
system.
 
Overall,
 
these
 
Carboniferous
 
coals
 
contain
 
two-fifths
 
of
 
the
 
USA’s
 
bituminous
 
coal
 
deposits
 
and
extend over 1,448 kilometers
 
from northern Alabama
 
to Pennsylvania and are
 
part of
 
what is known
as the
Appalachian Basin
.
 
The Appalachian
 
Basin is
 
more than
 
402 kilometers
 
wide and,
 
in some
portions, contains over 60 coal seams of varying economic significance.
Within the Central
 
Appalachian Basin, seams
 
of economic significance
 
typically range
 
between 0.3
meters and 1.8 meters in thickness, with relatively little structural deformation.
 
Regional structure
is typically characterized by gently dipping strata
 
to the northwest at less than one percent.
The coal-bearing formations of interest at Logan
 
is of the
 
lower section of -
 
the Kanawha Formation,
which
 
comprise
 
a
 
major
 
portion
 
of
 
the
 
exposed
 
ridges.
 
The
 
coal-bearing
 
Formation
 
includes
sedimentary sequences of sandstones, siltstones, shales,
 
and mudstones with minor
 
occurrences of
siderite, limestone and flint clay.
Coronado
mines
 
several
 
horizons
 
within
 
the
 
Kanawha
 
formation.
 
The
 
horizons
 
are
 
as
 
follows:
 
Buffalo Creek, Upper
 
Clarion Rider,
 
Clarion, Lower Clarion, Upper Stockton,
 
Lower Stockton, Lower
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
20
Coalburg,
 
Lower
 
Dorothy,
 
Upper
 
Winifrede,
 
Lower
 
Winifrede,
 
Chilton-A,
 
Chilton,
 
Upper
 
Cedar
Grove,
 
Middle
 
Cedar
 
Grove,
 
Lower
 
Cedar
 
Grove,
 
No.
 
2
 
Gas,
 
Upper
 
Powellton,
 
Lower
 
Powellton,
Eagle, and Lower War Eagle seams demonstrate
 
mining potential on this property.
Logan currently
 
has four
 
active underground
 
mines and
 
one active
 
surface mine.
 
The Toney
 
Fork
mine is a surface
 
mine, while the North Fork Winifrede,
 
Eagle No. 1, Muddy Bridge
 
and Lower War
Eagle are
 
underground mines.
 
The active Toney
 
Fork surface
 
mine has historically
 
mined multiple
seams including the Upper Winifrede,
 
Lower Winifrede, Upper
 
Clarion Rider,
 
Upper Clarion, Lower
Clarion,
 
Lower
 
Coalburg, Upper
 
Coalburg,
 
Upper Stockton,
 
Lower
 
Stockton,
 
Chilton-A,
 
and
 
Lower
Dorothy Seams.
 
Future surface
 
mine reserve production
 
at Logan
 
is anticipated
 
to focus
 
on those
seams having
 
the best
 
opportunity for
 
sale into
 
the metallurgical
 
coal markets,
 
namely the
 
Lower
Coalburg seam and below.
 
The Powellton
 
No. 1 Mine is
 
projected to extract
 
the Lower and Upper
Powellton jointly in some
 
areas, while other
 
areas are projected to
 
extract only the Lower
 
Powellton
due to seam splitting.
 
The Eagle No. 1
 
and Muddy Bridge Mines are
 
projected to extract
 
the No. 2
Gas seam.
 
The Lower War Eagle mine is projected to extract
 
the Lower War Eagle seam.
 
6.2
Mineralization
The generalized stratigraphic
 
columnar section in
Figure 6-1
 
demonstrates the vertical
 
relationship
of the principal coal seams and rock formations on the Property.
 
 
ex963p2i0
 
ex963p30i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
21
Figure 6-2:
 
Logan Stratigraphic Column
(not to scale)
6.3
Deposits
The coal produced
 
at Logan Mine
 
complex is typically
 
high-volatile (typically
 
28 percent
 
or greater
volatile
 
matter
 
content)
 
bituminous coal.
 
Seam quality
 
varies with
 
distance from
 
the cropline,
 
so
some seams will be shipped into
 
both the thermal and metallurgical
 
markets depending on
 
mining
method and ultimate quality.
 
Saleable product from the surface
 
operations is projected to
 
be sold
primarily into
 
the metallurgical
 
coal market;
 
however,
 
some production
 
is planned to
 
be sold
 
into
the thermal
 
coal market
 
due to
 
quality limitations.
 
Underground coal
 
is sold almost
 
exclusively in
the metallurgical markets.
7
Exploration
7.1
Nature and Extent of Exploration
The
 
Properties
 
have
 
been
 
extensively
 
explored
 
by
 
subsurface
 
drilling
 
efforts
 
carried
 
out
 
by
numerous entities, most of which were completed prior to acquisition by Coronado.
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
22
Diamond
 
core,
 
rotary,
 
and
 
gas
 
well
 
drilling
 
are
 
the
 
three
 
primary
 
types
 
of
 
exploration
 
on
 
the
Property.
 
Drill hole
 
collar elevations
 
and total
 
depths vary
 
by hole
 
due to
 
the hilly
 
terrain
 
of the
Property.
 
Data
 
for
 
correlation
 
and
 
mining
 
conditions
 
are
 
derived
 
from
 
core
 
descriptions
 
and
geophysical
 
logging
 
(e-logging).
 
Coal
 
quality
 
analyses
 
were
 
also
 
employed
 
during
 
the
 
core
exploration
 
process.
 
A
 
total
 
of
 
1,131
 
core
 
and
 
rotary
 
holes
 
have
 
been
 
drilled
 
for
 
exploration
purposes on and around the leased property.
 
In 2022,
 
Coronado completed
 
four exploration
 
holes, incorporated
 
herein.
 
Two
 
of the new
 
holes
benefited
 
the
 
deep
 
No. 2
 
Gas Lower
 
(Eagle
 
seam)
 
reserve,
 
while
 
rock
 
samples for
 
the
 
other two
were collected for Acid-Base accounting for
 
surface mine operations.
Drill records
 
indicate that
 
independent contract
 
drilling operators
 
have
 
typically been
 
engaged
 
to
carry out drilling
 
on the Property.
 
Geophysical logging
 
was typically performed
 
by outside logging
firms.
 
MM&A, via
 
its Geophysical
 
Logging Systems
 
subsidiary,
 
has logged
 
a significant
 
number of
the past exploration holes and gas wells, and currently logs most of the
 
recently drilled holes.
The location of the drilling is shown on the maps included in
Appendix B
.
The
 
concentration
 
of
 
exploration
 
varies
 
slightly
 
across
 
the
 
Property.
 
Drilling
 
on
 
the
 
Property
 
is
typically sufficient for delineation of potential surface, highwall miner, and deep mineable benches.
 
Core
 
logging
 
is
 
performed
 
by
 
professional
 
geologists
 
in
 
cases
 
where
 
roof
 
and
 
floor
 
strata
 
are
 
of
particular interest
 
and in cases
 
where greater
 
resolution and
 
geologic detail
 
are needed.
 
Even so,
most of the drill
 
hole data comes from more simplified
 
driller’s logs, which often lack
 
specific details
regarding
 
geotechnical
 
conditions
 
and
 
specific
 
geology,
 
making
 
correlations
 
and
 
floor
 
and
 
roof
conditions
 
more
 
difficult
 
to
 
determine.
 
Geophysical
 
logging
 
(e-logging)
 
techniques,
 
by
 
contrast,
document
 
specific
 
details
 
useful
 
for
 
geologic
 
interpretation
 
and
 
mining
 
conditions.
 
Given
 
the
variability
 
of data
 
-gathering
 
methods,
definitive
 
mapping of
 
future
 
mining conditions
 
may
 
not be
possible, but projections and assumptions can be
 
made within a
reasonable
 
degree of certainty.
 
A
significant
 
effort
 
was put
 
into
 
verifying the
 
integrity of
 
the database
 
records.
 
Once the
 
data
 
was
verified, stratigraphic
 
columnar sections were
 
generated using
 
cross-sectional analysis to
 
establish
or confirm coal seam correlations.
A typical cross-section is shown in
Figure 7-1
.
 
 
ex963p2i0 ex963p32i1
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
23
Figure 7-1:
 
Logan Cross-Section
Due to
 
the long history
 
of exploration
 
by various
 
parties on the
 
Property,
 
a wide
 
variety of
 
survey
techniques exist for
 
documentation of data
 
point locations.
 
Many of
 
the older
 
exploration drill holes
appear to
 
have been
 
located by
 
survey and
 
more recently-completed
 
drill holes
 
are often
 
located
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
24
by high-resolution Global
 
Positioning System (
GPS
) units.
 
However, some holes appear
 
to have been
approximately
 
located
 
using
 
USGS
 
topography
 
maps
 
or
 
other
 
methods
 
which
 
are
 
less
 
accurate.
 
Therefore, discretion by MM&A
 
had to be used regarding the accuracy for
 
the location and ground
surface
 
elevation
 
of
 
some
 
of
 
these
 
older
 
drill
 
holes.
 
In
 
instances
 
where
 
a
 
drill
 
hole
 
location
 
(or
associated coal
 
seam elevations)
 
appeared to
 
be inconsistent
 
with the
 
overall
 
structural trend
 
(or
surface
 
topography
 
for
 
surface-mineable
 
areas),
 
the
 
data
 
point
 
was
 
not
 
honored
 
for
 
geological
modeling.
 
Others with
 
apparently minor variances
 
were logically adjusted
 
and then
 
used by
 
MM&A.
 
Surveying of the underground and surface mined areas has been performed by the mine operators
and/or
 
their
 
consulting
 
surveyors.
 
By
 
assignment,
 
MM&A
 
did
 
not
 
verify
 
the
 
accuracy
 
or
completeness
 
of
 
the
 
supplied
 
mine
 
maps
 
but
 
accepted
 
this
 
information
 
as
 
being
 
the
 
work
 
of
responsible engineers and surveyors, as required by both State
 
and Federal La
w.
MM&A
 
compiled
 
comprehensive
 
topographic
 
map
 
files
 
by
 
selecting
 
the
 
best
 
available
 
aerial
mapping for
 
each area, surface
 
mine resources
 
and reserves in
 
particular,
 
and filled any
 
gaps with
digital USGS topographic mapping.
7.2
Non-Drilling Procedures and Parameters
Some analyses, specifically
 
ultimate ash and
 
sulfur types are
 
not as prevalent as
 
others in the
 
testing
done
 
on
 
samples
 
recovered
 
by
 
drilling.
 
To
 
supplement
 
the
 
information
 
database,
 
samples
 
have
been collected from mine stockpiles and either truck or train shipment samples.
7.3
Drilling Procedures
Core drilling methods utilize NX-size (5.4 centimeters) or similar-sized core cylinders to
 
recover core
samples, which
 
can be
 
used to
 
delineate
 
geologic characteristics,
 
and for
 
coal quality
 
testing
 
and
geotechnical logging.
 
For the core
 
holes, the geophysical
 
logs are especially
 
useful in verifying
 
the
core recovery of both
 
the coal samples
 
(for assurance that sample
 
is representative of the full
 
seam)
and
 
of
 
the
 
roof
 
and
 
floor
 
rock
 
samples
 
(for
 
evaluating
 
ground
 
control
 
characteristics
 
of
 
deep
mineable coal
 
seams).
 
In addition
 
to the
 
core holes,
 
rotary drilled
 
holes also
 
exist on
 
most of
 
the
Properties.
 
Data
 
for
 
the
 
rotary
 
drilled
 
holes
 
is
 
mainly
 
derived
 
from
 
downhole
 
geophysical
 
logs,
which are
 
used to
 
interpret
 
coal and
 
rock thickness
 
and depth
 
since logging
 
of the
 
drill cuttings
 
is
not reliable.
A wide variety
 
of core-logging techniques
 
exist for
 
the properties.
 
For many of
 
the core holes, the
primary data
 
source is a
 
generalized
 
lithology description by
 
the driller,
 
typically supplemented
 
by
a more detailed core log completed by a geologist.
 
The Logan drilling logs were provided to MM&A
as
 
a geological
 
database.
 
MM&A geologists
 
were
 
not involved
 
in the
 
production
 
of original
 
core
logs but did perform
 
a basic check
 
of information within the provided database.
 
Where geophysical
logs for
 
such holes
 
are available,
 
they were
 
used by
 
MM&A geologists
 
to verify
 
the coal
 
thickness
and core recovery of each seam.
 
 
 
ex963p2i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
25
7.4
Hydrology
Hydrologic
 
testing
 
and
 
forecasting
 
are
 
necessary parts
 
of the
 
permitting
 
process
 
and
 
as
 
such
 
are
routinely considered in the mine planning process.
Logan
 
has
 
a
 
lengthy
 
history
 
of
 
operation
 
and
 
five
 
currently
 
active
 
mines
 
with
 
no
 
significant
hydrologic concerns or
 
material issues
 
experienced in its
 
history.
 
Future mining
 
is projected to
 
occur
in areas exhibiting similar hydrogeological conditions as past mining, including stream undermining
and undermining
 
of aquifers.
 
Based upon
 
the successful
 
history of
 
the operation
 
with regards
 
to
hydrogeological features,
 
MM&A assumes that the operation will not be hindered by such issues in
the future.
7.5
Geotechnical Data
Mining
 
plans
 
for
 
potential
 
underground
 
mines
 
were
 
developed
 
by
 
Coronado
 
and
 
modified
 
by
MM&A to
 
fit current
 
property constraints.
 
Pillar stability
 
was tested
 
by MM&A
 
using the
Analysis
of
 
Coal
 
Pillar
 
Stability
 
(ACPS)
 
program
 
that
 
was
 
developed
 
by
 
the
National
 
Institute
 
for
Occupational Safety and Health (
NIOSH
)
.
 
MM&A reviewed the results from the ACPS analysis and
considered it
 
in the
 
development of
 
the LOM
 
plan.
 
Coal and
 
rock strengths
 
from core
 
testing are
used to verify the empirical assumptions integral to ACPS.
8
Sample Preparation, Analyses and Security
8.1
Prior to Sending to the Lab
Most
 
of the
 
coal
 
samples have
 
been obtained
 
from
 
the Property
 
by subsurface
 
exploration
 
using
core drilling
 
techniques.
 
The protocol
 
for preparing
 
and testing
 
the samples
 
has varied
 
over time
and is not well documented for the older holes drilled on the Property.
 
Following a process, typical
USA
 
core
 
drilling
 
sampling
 
technique
 
is
 
for
 
the
 
coal
 
core
 
sample,
 
once
 
recovered
 
from
 
the
 
core
barrel, to be described then wrapped in a sealed plastic sleeve
 
and placed into a wooden core box,
which
 
is
 
the
 
length
 
of
 
the
 
sample
 
and
 
covered
 
with
 
a
 
lid
 
so
 
that
 
the
 
core
 
can
 
be
 
delivered
 
to
 
a
laboratory in relatively intact
 
condition and with inherent moisture content.
 
Each core sample box
is identified with the
 
seam, hole identification number and
 
the sample interval depth scribed
 
on the
sample box lid.
 
This process
 
has been
 
the norm
 
for both historical and
 
ongoing exploration activities
at Logan.
This work is
 
typically performed by
 
the supervising
 
driller, geologist or company personnel.
 
Samples
are
 
most
 
often
 
delivered
 
to
 
the
 
company
 
by
 
the
 
driller
 
after
 
each
 
shift
 
or
 
acquired
 
by
 
company
personnel or representatives.
 
Most of the coal core samples were obtained
 
by previous or current
operators
 
on the Property.
 
MM&A did not participate
 
in the sample
 
collection and analysis of
 
the
core samples.
 
However,
 
it is
 
reasonable to
 
assume, given
 
the sophistication
 
level of
 
the previous
operators,
 
that
 
these
 
samples
 
were
 
generally
 
collected
 
and
 
processed
 
under
 
industry
 
best-
 
 
ex963p2i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
26
practices.
 
This assumption is
 
based on MM&A’s
 
familiarity with
 
the operating
 
companies and the
companies used to perform the analysis.
8.2
Lab Procedures
Coal quality testing has
 
been performed over a large number
 
of years by operating companies using
different
 
laboratories
 
and
 
testing
 
regimens.
 
Some
 
of
 
the
 
samples
 
have
 
raw
 
analyses
 
and
washabilities of
 
the full seam
 
(with coal
 
and rock parting
 
layers
 
co-mingled) and
 
are mainly
 
useful
for
 
characterizing
 
the coal
 
quality for
 
projected
 
production
 
from
 
underground
 
and highwall
 
mine
operations.
 
Other
 
samples
 
have
 
coal
 
and
 
rock
 
analyzed
 
separately,
 
the
 
results
 
of
 
which
 
can
 
be
manipulated
 
to forecast
 
either surface
 
or underground
 
mine quality.
 
Care has
 
been taken
 
to use
only
 
those
 
analyses
 
that
 
are
 
representative
 
of
 
the
 
coal
 
quality
 
parameters
 
for
 
the
 
appropriate
mining type for each sample.
Standard procedure
 
upon receipt of
 
core samples by the
 
testing laboratory
 
is to log the
 
depth and
thickness
 
of
 
the
 
sample,
 
then
 
perform
 
testing
 
as
 
specified
 
by
 
a
 
representative
 
of
 
the
 
operating
company.
 
Each
 
sample
 
is
 
then
 
analyzed
 
in
 
accordance
 
with
 
procedures
 
defined
 
under
ASTM
International (
ASTM
)
 
standards including, but not
 
limited to; washability (ASTM D4371);
 
ash (ASTM
D3174);
 
sulfur
 
(ASTM
 
D4239);
 
Btu/lb.
 
(ASTM
 
D5865);
 
volatile
 
matter
 
(ASTM
 
D3175);
 
Free
 
Swell
Index (
FSI
) (ASTM D720).
9
Data Verification
9.1
Procedures of Qualified Person
MM&A reviewed the digital geologic
 
database supplied by Coronado.
 
The database consists of
 
data
records, which
 
include drill hole
 
information for
 
holes that
 
lie within and
 
adjacent to
 
the Property
and
 
records
 
for
 
numerous
 
supplemental
 
coal
 
seam
 
thickness
 
measurements.
 
For
 
supplemental
record
 
verification,
 
copies
 
of
 
each
 
entry
 
were
 
printed,
 
and
 
cross
 
referenced
 
to
 
the
 
original
document for
 
verification.
 
Once the initial
 
integrity of the
 
database was
 
established, stratigraphic
columnar sections were
 
generated
 
using cross-sectional analysis
 
to establish
 
or confirm coal
 
seam
correlations.
 
Geophysical
 
logs
 
were
 
used
 
wherever
 
available
 
to
 
assist
 
in
 
confirming
 
the
 
seam
correlation
 
and
 
to
 
verify
 
proper
 
seam
 
thickness
 
measurements
 
and
 
recovery
 
of
 
intercepted
 
coal
sections and collected samples.
 
After establishing and/or verifying proper seam correlation, seam data control maps and geological
cross-sections were generated
 
and again used to verify seam correlations and data
 
integrity.
 
Once
the database was fully vetted, seam thickness, base of seam elevation, roof and floor lithology, and
overburden maps were independently generated
 
for use in the mine planning process.
 
 
ex963p2i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
27
9.2
Limitations
As
 
with
 
any
 
exploration
 
program,
 
localized
 
anomalies
 
cannot
 
always
 
be
 
discovered.
 
Ideally,
 
the
greater
 
the density
 
of the
 
samples taken,
 
the less
 
the risk.
 
Once an
 
area is
 
identified as
 
being of
interest for inclusion in the mine plan, additional samples are taken to help reduce the risk in those
specific areas.
 
In general, provision
 
is made in the
 
mine planning portion of
 
the study to
 
allow for
localized anomalies that are typically classed more as a nuisance than a hinderance.
9.3
Opinion of Qualified Person
Sufficient data
 
has been obtained
 
through various
 
exploration and
 
sampling programs
 
and mining
operations
 
to
 
support
 
the
 
geological
 
interpretations
 
of
 
seam
 
structure
 
and
 
thickness
 
for
 
coal
horizons
 
situated
 
on the
 
Property.
 
The data
 
is of
 
sufficient
 
quantity
 
and reliability
 
to
 
reasonably
support the coal resource and coal reserve estimates in this TRS.
10
Mineral Processing and Metallurgical Testing
10.1
Testing
 
Procedures
Separate
 
tabulations
 
have
 
been
 
compiled
 
for
 
basic
 
chemical
 
analyses
 
(both
 
raw
 
and
 
washed
quality), petrographic
 
data, rheological
 
data and
 
chlorine, ash,
 
ultimate and
 
sulfur analysis.
 
Some
of
 
the
 
data
 
categories
 
from
 
the
 
analyses
 
are
 
not
 
as
 
prevalent
 
and
 
have
 
been
 
supplemented
 
by
samples collected from mine stockpiles and either truck or train shipment samples.
Available coal quality data was tabulated by resource area in a Microsoft® EXCEL workbook and the
details of that work are maintained on file at
 
the offices of Coronado and MM&A.
 
These tables also
provide basic
 
statistical
 
analyses of
 
the coal
 
quality attributes,
 
including average
 
value; maximum
and minimum values;
 
and the sample
 
count (number of
 
samples) available to
 
represent each quality
parameter
 
of
 
the
 
seam.
 
Coal
 
samples
 
that
 
were
 
deemed
 
by
 
MM&A
 
geologists
 
to
 
be
unrepresentative
 
were
 
not
 
used
 
for
 
statistical
 
analysis
 
of
 
coal
 
quality,
 
as
 
documented
 
in
 
the
tabulations.
 
A representative
 
group of
 
drill hole
 
samples from
 
the Properties
 
were
 
then checked
against the original drill laboratory reports to verify accuracy
 
and correctness.
The amount and areal extent of coal sampling
 
for geological data is generally sufficient to represent
the quality characteristics of
 
the coal horizons
 
and allow for
 
proper market placement of
 
the subject
coal
 
seams.
 
For
 
some
 
of
 
the
 
coal
 
deposits,
 
there
 
are
 
considerable
 
laboratory
 
data
 
from
 
core
samples
 
that
 
are
 
representative
 
of
 
the
 
full
 
extent
 
of
 
the
 
resource
 
area;
 
and
 
for
 
others
 
there
 
are
more
 
limited
 
data
 
to
 
represent
 
the
 
resource
 
area.
 
For
 
example,
 
in
 
the
 
active
 
operations
 
with
considerable
 
previous
 
mining,
 
there
 
may
 
be
 
limited
 
quality
 
data
 
within
 
some
 
of
 
the
 
remaining
resource
 
areas;
 
however,
 
in
 
those
 
cases
 
the
 
core
 
sampling
 
data
 
can
 
be
 
supplemented
 
with
operational data from mining and shipped quality samples representative
 
of the resource area.
 
 
ex963p2i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
28
10.2
Relationship of Tests
 
to the Whole
The extensive
 
sampling and
 
testing procedures
 
typically followed
 
in the
 
coal
 
industry result
 
in an
excellent correlation between samples and marketable
 
product.
 
Shipped analyses of the coal from
Logan were reviewed to verify
 
that the coal
 
quality and characteristics were as
 
expected.
 
The Logan
properties
 
have
 
a
 
long
 
history
 
of
 
saleable
 
production,
 
under
 
various
 
owners,
 
in
 
the
 
high-volatile
metallurgical and thermal markets, confirming exploration
 
results.
10.3
Lab Information
Each sample
 
is analyzed
 
at area
 
Laboratories
 
that operate
 
in accordance
 
with procedures
 
defined
under ASTM standards including, but not limited to; washability (ASTM D4371); ash (ASTM D3174);
sulfur (ASTM
 
D4239); Btu/lb.
 
(ASTM D5865);
 
volatile matter
 
(ASTM D3175);
 
Free Swell
 
Index (
FSI
)
(ASTM D720).
10.4
Relevant Results
No critical factors have been found
 
that would adversely affect the recovery
 
of the Reserve.
 
11
Mineral Resource Estimates
MM&A
 
independently
 
created
 
a
 
geologic
 
model
 
to
 
define
 
the
 
coal
 
resources
 
of
 
Logan.
 
Coal
resources were estimated
 
as of December 31, 2022.
11.1
Assumptions, Parameters and Methodology
Geological
 
data
 
was
 
imported
 
into
 
Carlson
 
Mining
®
 
(formerly
 
SurvCADD
®
)
 
geological
 
modelling
software
 
in
 
the
 
form
 
of Microsoft
®
 
Excel
 
files
 
incorporating
 
drill
 
hole
 
collars,
 
seam
 
and
 
thickness
picks, bottom
 
seam elevations
 
and raw
 
and washed
 
coal quality.
 
These data
 
files were
 
validated
prior to importing into the software.
 
Once imported, a geologic model was created, reviewed, and
verified with
 
a key
 
element being
 
a gridded model
 
of coal
 
seam thickness.
 
Resource tonnes
 
were
estimated by using the
 
seam thickness grid
 
based on each
 
valid point of observation
 
and by defining
resource confidence arcs around the
 
points of observation.
 
Points of observation for Measured and
Indicated
 
confidence
 
arcs
 
were
 
defined
 
for
 
all
 
valid
 
drill
 
holes
 
that
 
intersected
 
the
 
seam
 
using
standards
 
deemed acceptable
 
by MM&A
 
based on
 
a detailed
 
geologic evaluation
 
and a
 
statistical
analysis
 
of
 
all
 
drill
 
holes
 
within
 
the
 
projected
 
reserve
 
areas
 
as
 
described
 
in
Section
 
11.1.1
.
 
The
geological
 
evaluation
 
incorporated
 
an
 
analysis
 
of
 
seam
 
thickness
 
related
 
to
 
depositional
environments, adjacent roof and floor lithologies, and structural influences.
After validating coal seam data and establishing correlations, the thickness and elevation for seams
of
 
economic
 
interest
 
were
 
used
 
to
 
generate
 
a
 
geologic
 
model.
 
Due
 
to
 
the
 
relative
 
structural
simplicity
 
of
 
the
 
deposits
 
and
 
the
 
reasonable
 
continuity
 
of
 
the
 
tabular
 
coal
 
beds,
 
the
 
principal
geological
 
interpretation
 
necessary
 
to
 
define
 
the
 
geometry
 
of
 
the
 
coal
 
deposits
 
is
 
the
 
proper
modeling
 
of
 
their
 
thickness
 
and
 
elevation.
 
Both
 
coal
 
thickness
 
and
 
quality
 
data
 
are
 
deemed
 
by
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
29
MM&A to be reasonably sufficient within the resource areas.
 
Therefore, there is a reasonable level
of confidence in the geologic
 
interpretations required for coal resource determination based on the
available data and the techniques applied to the data.
Table 11-1
 
below provides the geological mapping and
 
coal tonnage estimation criteria used for the
coal resource
 
and reserve
 
evaluation.
 
These cut-off
 
parameters
 
have
 
been developed
 
by MM&A
based on
 
its experience
 
with the
 
Coronado properties
 
and are
 
typical of
 
mining operations
 
in the
Central
 
Appalachian
 
coal
 
basin.
 
This
 
experience
 
includes
 
technical
 
and
 
economic
 
evaluations
 
of
numerous
 
properties
 
in the
 
region
 
for
 
the
 
purposes of
 
determining
 
the
 
economic
 
viability of
 
the
subject coal reserves.
Table 11-1:
 
General Reserve & Resource Criteria
Item
Parameters
Technical Notes & Exceptions*
•
 
General Reserve Criteria
 
 
Reserve Classification
Reserve and Resource
Coal resources as reported are inclusive of coal reserves.
Reliability Categories
Reserve (Proven and Probable)
Resource (Measured, Indicated & Inferred)
To better reflect geological conditions of the coal
deposits, distance between points of observation is
standard USGS (in meters), respectively, for measured
and indicated and inferred.
Effective Date of Resource Estimate
December 31, 2022
Coal resources were updated for depletion and non-
material resource additions based on information from
Coronado.
 
Effective date for coal resources is as of
December 31, 2022.
Effective Date of Reserve Estimate
December 31, 2022
Coal reserves were updated for depletion and non-
material reserve additions based on information from
Coronado.
 
Effective date for coal reserves is as of
December 31, 2022.
Seam Density
Variable, dependent upon seam characteristics
(based on available drill hole quality).
 
In the
absence of laboratory data, estimated by (1)
assuming specific gravity of 1.30 for coal and 2.25
to 2.5 for rock parting, or (2) 1280 kg/m
3
to 1324
kg/m
3
 
for a "clean" seam)
•
 
Underground-Mineable Criteria
Map Thickness
Total seam thickness
Minimum Seam Thickness
0.76 meters (thermal coal); 0.68 meters
(metallurgical coal)
 
Minimum Mining Thickness
1.4 to 1.8 meters
Minimum Total Coal Thickness
0.76 meters (thermal coal); 0.68 meters
(metallurgical coal)
 
Minimum In-Seam Wash Recovery
50 percent; 40 percent where coal is belted
directly to preparation plant
Wash Recovery Applied to Coal
Reserves
Based on average yield for drill holes within
reserve area, or in the absence of laboratory
washability data, based on estimated visual
recovery using specific gravities noted above and
95 percent yield on "clean" coal
Item
Parameters
Technical Notes & Exceptions*
•
 
Underground-Mineable Criteria
 
Out-of-Seam Dilution Thickness for
Run-of-Mine Tonnes Applied to Coal
Reserves
0.05 meters minimum
2243 kg/m³ density used for dilution tonnage estimate
Mine Barrier
60.96-meter distance from abandoned mines and
sealed or pillared areas; 30.4-meter distance from
planned highwall miner panels
Minimum Reserve Tonnage
226,796 recoverable tonnes for individual area
(logical mining unit)
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
30
Minimum Overburden Depth
30.48 meters
Minimum Interval to Rider Coal
Considered on a case-by-case basis, depending on
interval lithology, etc.
<1.5 meters are resource
Minimum Interval to Overlying or
Underlying Reserves
Considered on a case-by-case basis, depending on
interval lithology, extent and type of extraction,
etc.
Typically, 12.19 meters
Minimum Interval to Overlying or
Underlying Mined Areas
Considered on a case-by-case basis, depending on
interval lithology, extent and type of extraction,
etc.
Adjustments Applied to Coal Reserves
6 percent moisture increase; 5 percent loss for
preparation plant inefficiency
Surface Mineable Criteria
Topographic Map Source
Reserves estimated based on aerial topography,
where available, and best available aerial
topography for other areas.
 
Pre-law highwalls
also based on aerial topography, where available
Map Thickness
Total mineable seam thickness (excluding removal
partings)
Mine Recovery Applied to Coal
Reserves
90 percent; 25 percent for previously
underground mined areas.
 
Wash Recovery
Not Applicable for most reserves estimated on a
direct-ship basis.
 
Where surface mineable coal is
projected to be washed, based on average yield
for drill holes within reserve area, or in the
absence of laboratory washability data, based on
estimated visual recovery using specific gravities
noted above and 95 percent yield on "clean" coal
Minimum Thickness
0.3 meter for principal seam (principal seam is any
that is >0.76 meters from another mineable coal
bench)
0.15 meters for a split of a principal seam (split is
within 0.76 meters of another mineable coal
bench)
Minimum thickness of recoverable
coal within single seam
CTR/Area/HWM areas
0.6 meters
Removable Rock Parting Thickness
0.07 meters
Maximum Cumulative Area Mining
Strip Ratio
30:1 – Area
15:1 - CTR
Exceptions considered for metallurgical grade coal
products if deemed economical
Design Bench Width for
Contour/HWM Areas
38.1 meters (Contour reserves estimated in
conjunction with potential HWM reserves)
Adjustments Applied to Marketable
Coal Reserves
4.5 percent moisture increase
Out-of-Seam Dilution Thickness
Applied to Coal Reserves
NA
2% adjustment (addition) made to product coal quality
ash to account for dilution
 
Surface Property Control
Reserves considered where surface is controlled;
tonnage not estimated or classified as resource
where surface is uncontrolled.
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
31
Item
Parameters
Technical Notes & Exceptions*
Highwall Miner Reserves
Penetration Depth
91.4 – 243.8 meters
Seam Density & Wash Recovery
Similar to underground-mineable reserves
Mine Recovery Applied to Coal
Reserves
40 percent
 
Minimum Coal Thickness
0.6 meter
Minimum Mining Height
0.9 meter
Adjustments Applied to Marketable
Coal Reserves
6 percent moisture increase and 5 percent loss for
preparation plant inefficiency
Out-of-Seam Dilution Thickness
Applied to Coal Reserves
0.9 meter less seam height
2242 to 2402 kg/m
3
 
density used for dilution tonnage
estimate
Note:
 
Exceptions for
 
application of
 
these criteria
 
to resource
 
and reserve
 
estimation are
 
made as
 
warranted and
 
demonstrated by
 
either actual
 
mining
experience or detailed data
 
that allows for empirical
 
evaluation of mining conditions.
 
Final classification of coal reserve
 
is made based on the
 
pre-
feasibility evaluation.
11.1.1
Geostatistical Analysis
MM&A completed a
 
geostatistical analysis on drill
 
holes within
 
the reserve boundaries
 
to determine
the applicability of the common United States classification system for measured and indicated and
inferred coal
 
resources.
 
Historically,
 
the United States
 
has assumed that coal
 
within 0.4-kilometer
of a point of observation represents a measured resource whereas coal between 0.4 kilometer
 
and
1.2 kilometer from
 
a point
 
of observation
 
is classified
 
as indicated.
 
Inferred resources are commonly
assumed to be located between 1.2 kilometers and 4.8 kilometers from a point of observation.
 
Per
SEC
 
regulations,
 
only
 
measured
 
and
 
indicated
 
resources
 
may
 
be
 
considered
 
for
 
reserve
classification, respectively as proven and probable reserves.
MM&A performed
 
a geostatistical
 
analysis test
 
of the
 
Logan data
 
set using
 
the Drill
 
Hole Spacing
Analysis
 
(
DHSA
)
 
method.
 
This
 
method
 
attempts
 
to
 
quantify
 
the
 
uncertainty
 
of
 
applying
 
a
measurement
 
from
 
a
 
central
 
location
 
to
 
increasingly
 
larger
 
square
 
blocks
 
and
 
provides
recommendations
 
for determining
 
the distances
 
between drill
 
holes for
 
measured, indicated,
 
and
inferred resources.
To
 
perform DHSA the data
 
set was processed to remove
 
any erroneous data points,
 
clustered data
points, as
 
well as
 
directional trends.
 
This was
 
achieved through
 
the use
 
of histograms,
 
as seen
 
in
Figure 11-1
, color coded scatter
 
plots showing the geospatial positioning
 
of the borings,
Figure 11-
2
, and trend analysis.
 
 
 
ex963p2i0 ex963p41i2 ex963p41i1
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
32
Figure 11-1:
 
Histogram of the Total
 
Seam
Thickness for the No. 2 Gas Seam Present in the
Logan Complex
Figure 11-2:
 
Scatter plot of the Total
 
Seam
Thickness for the No. 2 Gas Seam Present in the
Logan Complex
Following the completion of
 
data processing, a variogram
 
of the data set was
 
created,
Figure 11-3
.
 
The
 
variogram
 
plots average
 
square difference
 
against
 
the separation
 
distance
 
between
 
the data
pairs.
 
The
 
separation
 
distance
 
is broken
 
up into
 
separate
 
bins defined
 
by a
 
uniform
 
lag distance
(e.g., for
 
a lag
 
distance of
 
152 meters
 
the bins
 
would be
 
0 –
 
152 meters,
 
153 –
 
305 meters,
 
etc.).
 
Each pair of data points that are less than one lag distance apart are reported in the first bin.
 
If the
data
 
pair
 
is
 
further
 
apart
 
than
 
one
 
lag
 
distance
 
but
 
less
 
than
 
two
 
lag
 
distances
 
apart,
 
then
 
the
variance is reported in the second bin.
 
The numerical average for differences
 
reported for each bin
is then plotted on the variogram.
 
Care was taken to
 
define the lag distance in such a way
 
as to not
overestimate any nugget effect
 
present in the data set.
 
Lastly, modeled equations, often spherical,
gaussian, or
 
exponential, are
 
applied to
 
the variogram
 
in order
 
to represent
 
the data
 
set across
 
a
continuous spectrum.
 
 
ex963p2i0 ex963p42i1
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
33
Figure 11-3: Variogram of the Total
 
Seam Thickness for the No. 2 Gas Seam
 
Present in the Logan Complex
The estimation
 
variance is
 
then calculated
 
using information
 
from the
 
modeled variogram
 
as well
as
 
charts
 
published
 
by
 
Journel
 
and
 
Huijbregts
 
(1978).
 
This
 
value
 
estimates
 
the
 
variance
 
from
applying
 
a
 
single
 
central
 
measurement
 
to
 
increasingly
 
larger
 
square
 
blocks.
 
Care
 
was
 
taken
 
to
ensure any nugget effect present was added back
 
into the data.
 
This process was repeated for each
test block size.
The final step of the process
 
is to calculate the
 
global estimation variance.
 
In this step the number
square
 
blocks that
 
would fit
 
inside the
 
selected study
 
area is
 
determined for
 
each block
 
size
 
that
was
 
investigated
 
in the
 
previous
 
step.
 
The estimation
 
variance
 
is then
 
divided by
 
the number
 
of
blocks that
 
would fit
 
inside the
 
study area
 
for
 
each test
 
block size.
 
Following this
 
determination,
the data is then transformed back to represent
 
the relative error in the 95
th
-percentile range.
Figure 11-4
shows
 
the results
 
of the
 
DHSA
 
performed
 
on the
 
No. 2
 
Gas seam
 
data
 
for
 
the
 
Logan
Complex.
 
DHSA provides hole
 
to hole
 
spacing values,
 
these distances need
 
to be converted to
 
radius
from a central point in order to
 
compare to the historical standards.
 
A summary of the radius data
is shown
 
in
Table
 
11-3
.
 
DHSA prescribes
 
measured, indicated,
 
and inferred
 
drill hole
 
spacings be
determined at the 10-percent, 20-percent, and 50-percent
 
levels of relative error,
 
respectively.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex963p43i1
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
34
Figure 11-4: Result of DHSA for the No. 2 Gas Seam Present in the Logan Complex
Table 11-2:
 
DHSA Results Summary for Radius from a Central Point
Model:
Measured Radial Distance
(10% Relative Error)
Indicated Radial Distance
(20% Relative Error)
Inferred Radial Distance
(50% Relative Error)
(km)
(km)
(km)
Gaussian:
0.99
1.66
3.94
Spherical:
0.87
1.53
3.53
Exponential:
0.87
1.53
3.53
Comparing
 
the
 
results
 
of
 
the
 
DHSA
 
to
 
the
 
historical
 
standards,
 
it
 
is
 
evident
 
that
 
the
 
historical
standards
 
are
 
more
 
conservative
 
than
 
even
 
the
 
most
 
conservative
 
DHSA
 
model
 
with
 
regards
 
to
determining measured resources.
 
The Exponential and
 
Spherical models recommend using
 
a radius
of 0.87 kilometers for measured resources compared to the historical value of 0.4 kilometers.
 
With
respect to indicated resources,
 
the Spherical and Exponential models recommend using a
 
radius of
1.53 kilometers.
 
The historical radius of 1.2 kilometers is
 
therefore also more conservative than the
DHSA results
 
for indicated
 
resources.
 
These results
 
have led
 
the QPs
 
to report
 
the data
 
following
the historical classification standards, rather
 
than use the results of the DHSA.
11.2
Qualified Person’s Estimates
Mineral
 
resources
 
representing
 
in-situ
 
coal
 
are
 
estimated
 
Inclusive
 
of
 
Reserve
 
and
 
Exclusive
 
of
Reserves.
 
Based on the work and methods described above and detailed geologic modelling of the
areas considering all defined parameters,
 
a coal resource estimate,
 
summarized in
Table
 
11-3
, was
prepared as of December 31, 2022, for property controlled by Coronado.
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
35
Table 11-3:
 
Coal Resources Summary as of December 31, 2022 (Mt)
 
Coal Resource (Dry Tonnes, In Situ, MT)
Resource Quality (Dry)
Area
Measured
Indicated
Inferred
Total
Ash%
Sulfur%
VM%
Inclusive of Reserves
127.2
40.0
0.0
167.2
24
1.0
28
Exclusive of Reserves
45.2
37.0
3.4
85.6
Total 12/31/2022
172.5
77.0
3.4
252.8
Note:
 
Resource tonnes are inclusive of reserve tonnes since they include the in-situ tonnes from which recoverable coal reserves are
derived.
Note 2:
 
Coal resources are reported on a dry basis.
 
Surface moisture and inherent moisture are excluded.
Note 3: The Property has 82.2 Mt of dry, in-place measured and indicated resource tonnes exclusive of reserves as of December 31, 2022.
11.3
Resources Exclusive of Reserves
The Property contains multiple resource blocks which
 
were not deemed to
 
exhibit reserve potential
at the time
 
of the study.
 
These underground-mineable resources,
 
formally identified
 
as resources
exclusive of
 
reserves, are from
 
the No. 2 Gas,
 
Lower Powellton, Peerless,
 
Lower Winifrede, Middle
Cedar
 
Grove
 
and
 
Beckley
 
coal
 
seams.
 
There
 
are
 
also
 
surface
 
mineable
 
resources
 
exclusive
 
of
reserves in various seams. Reasons
 
which may preclude elevation
 
of resources to reserves
 
include,
but are not limited to:
1.
Unfavorable economics
 
at the PFS level, yet economics could become attractive
 
in the future
under different market
 
conditions.
 
2.
Exclusion from LOM planning by mining operator
 
due to remaining resource blocks which are
relatively small, isolated blocks and not currently attractive
 
from an operational perspective.
 
11.3.1
Initial Economic Assessment
MM&A completed an initial economic assessment to
 
determine the potential economic viability of
resources exclusive of reserves.
 
Unlike the economic analysis presented in
Section
 
19 developed to
test
 
reserves,
 
the initial
 
economic
 
assessment
 
below is
 
presented
 
on a
 
real basis
 
in 2023
 
dollars.
 
MM&A
 
applied
 
relevant
 
technical
 
factors
 
to
 
estimate
 
potential
 
saleable
 
tonnes
 
without
 
the
resource blocks, should the resources be extracted via
 
deep, continuous mining methods or
 
surface
area methods.
 
MM&A developed
 
cash cost
 
profiles for
 
the resource
 
blocks, including
 
direct cash
costs (labor,
 
supplies, roof control,
 
maintenance and
 
repair,
 
power,
 
and other); washing,
 
trucking,
materials
 
handling,
 
general
 
and
 
administrative,
 
and
 
environmental
 
costs;
 
and
 
indirect
 
cash
 
costs
(royalties, production taxes, property tax, insurance).
 
Costs were developed based off
 
relevant cost
drivers
 
(per-meter,
 
per-bank
 
cubic meter,
 
per-raw-tonne,
 
per-clean-tonne).
 
Additionally,
 
MM&A
estimated capital costs to extract
 
resources.
 
Capital costs associated with mine development were
amortized
 
across
 
the
 
resource’s
 
potential
 
saleable
 
tonnages.
 
Additional
 
non-cash
 
items
(depreciation of equipment and depletion) and cash costs were compared to an assumed sale price
of $154 per tonne
 
(FOB loadout) for underground
 
-mineable resources, representing
 
the long-term
average
 
price forecast
 
for HVB provided
 
by Coronado.
 
Surface resources
 
were assessed
 
at a
 
sales
price of
 
$83 per tonne
 
(FOB loadout)
 
based on estimated
 
historical pricing
 
for Coronado’s
 
surface
operations.
 
The results of the analysis are shown below and demonstrate potential profitability on
a fully loaded cost basis.
 
Detailed summaries are shown in
Appendix D
.
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex963p45i1
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
36
Table 11-4:
 
Results of Initial Economic Assessment
Mine
Resource
Block
Direct
Cash
Transportation,
Washing, Enviro,
G&A
Indirect
Non-Cash
Total
 
Cost
Fully
Loaded
P&L
Toney Fork #2
N2G
$66.67
$17.34
$19.81
$16.50
$120.32
$34.01
Pardee
N2G
$73.46
$20.85
$19.81
$11.60
$125.72
$28.60
Sugar Camp
N2G
$92.16
$25.16
$19.81
$9.38
$146.51
$7.82
Lower Powellton
LPOW
$71.00
$18.22
$19.81
$7.50
$116.53
$37.80
Lower Powellton
LPOW
$74.31
$18.99
$19.81
$19.19
$132.30
$22.02
N2G Peerless
Peer
$95.07
$15.53
$19.81
$15.81
$146.22
$8.11
Beckley
Bec
$64.83
$16.72
$19.81
$16.06
$117.42
$36.90
Middle Cedar Grove
MCG
$68.56
$18.21
$19.81
$35.73
$142.30
$12.02
Ramaco
N2G
$62.22
$21.52
$19.81
$29.31
$132.86
$21.46
Lower Winifrede
LWIN
$56.79
$20.02
$19.81
$12.69
$109.31
$45.01
Powellton No. 1
UPOW
$60.30
$21.11
$19.81
$7.50
$108.72
$45.61
Thermal Area Mines (S)
S
$49.96
$6.34
$12.73
$7.50
$76.52
$6.15
Figure 11-5:
 
Results of Initial Economic Assessment
11.4
Resources Inclusive of Reserves
The
Inclusive
 
of
 
Reserves
 
in-place
 
resource
 
account
 
for
 
66-percent
 
of
 
the
 
total
 
252.8
 
million
estimated in-situ resource.
 
Recoverable reserves for
 
both surface and underground mine methods
are
 
derived
 
from
 
the
Inclusive
 
of
 
Reserve
 
167.2
 
million
 
in-situ
 
resource.
 
Logan
 
reserves
 
are
discussed further in
Section 12
, Mineral Reserve Estimates below.
 
 
ex963p2i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
37
11.5
Qualified Person’s Opinion
While
 
there
 
is
 
some
 
level
 
of
 
stratigraphically
 
controlled
 
seam-thickness
 
variability
 
due
 
to
 
seam
splitting,
 
sand channels,
 
etc.,
 
the coal
 
seams on
 
the mine
 
property
 
in Logan
 
County demonstrate
reasonable
 
thickness
 
consistency
 
according
 
to
 
the
 
classification
 
system
 
of
measured
 
(0
 
–
 
0.4
kilometer),
indicated
 
(0.4 to 1.2
 
kilometers), and
inferred
 
(1.2 to 4.8 kilometers).
 
MM&A geologists
and engineers
 
modeled the deposit
 
and delineated mineable
 
regions to
 
reflect the
 
nature of
 
each
seam and the practicality of mining constraints.
 
Based on MM&A’s
 
geostatistical analysis, it would
be
 
possible
 
to
 
extend
 
the
 
measured,
 
indicated
 
and
 
inferred
 
arcs
 
slightly
 
beyond
 
historically
accepted practices due to consistent geological settings.
 
The QP’s have again elected not to extend
arc distances, introducing a level of conservatism in measured
 
and indicated coal classification.
Based on the data
 
review,
 
the attendant work
 
done to verify the data
 
integrity and the creation
 
of
an independent
 
geologic model,
 
the QPs
 
believe
 
this is
 
a fair
 
and accurate
 
representation
 
of the
Logan coal resources.
12
Mineral Reserve Estimates
12.1
Assumptions, Parameters and Methodology
Coal Reserves are classified as
proven
 
or
probable
 
considering “modifying factors” including mining,
metallurgical, economic, marketing, legal,
 
environmental, social and governmental
 
factors.
>
Proven Coal Reserves
 
are the economically mineable part of a measured coal resource,
adjusted for diluting materials and allowances for losses when the material is mined.
 
It is based
on appropriate assessment and studies in consideration of and adjusted
 
for reasonably
assumed modifying factors.
 
These assessments demonstrate that extraction
 
could be
reasonably justified at the time of reporting.
 
>
Probable Coal Reserves
 
are the economically mineable part of an indicated coal resource, and
in some circumstances a measured coal resource, adjusted
 
for diluting materials and
allowances for losses when the material is mined.
 
It is based on appropriate assessment and
studies in consideration of and adjusted for
 
reasonably assumed modifying factors.
 
These
assessments demonstrate that extraction
 
could be reasonably justified at the time of reporting.
 
Upon completion of delineation
 
and calculation of coal
 
resources, MM&A generated a LOM plan
 
for
Logan.
 
The footprint of each reserve area is shown on the maps in
Appendix B
.
 
The Mine plan was
generated
 
based
 
on
 
the
 
forecast
 
mine
 
plan
 
and
 
permit
 
plan
 
provided
 
by
 
Coronado
 
with
modifications by
 
MM&A where
 
necessary due
 
to current
 
property control
 
limits, modifications
 
to
geologic mapping, or other factors determined during the evaluation.
Carlson
 
Mining
 
software
 
was
 
used
 
to
 
generate
 
the
 
LOM
 
plan
 
for
 
Logan.
 
The
 
mine
 
plan
 
was
sequenced based on productivity schedules provided by
 
Coronado.
 
MM&A judged the productivity
estimates and plans to be reasonable based on experience and current industry practice.
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
38
Raw,
 
ROM
 
production
 
data
 
outputs
 
from
 
LOM
 
plan
 
sequencing
 
were
 
processed
 
into
 
Microsoft
®
EXCEL spreadsheets
 
and summarized
 
on an
 
annual basis
 
for processing
 
into the
 
economic model.
 
Average seam densities were
 
estimated to determine raw
 
coal tonnes produced
 
from the LOM
 
plan.
 
Average mine recovery
 
and wash recovery factors
 
were applied to determine coal reserve tonnes.
 
Coal
 
reserve
 
tonnes
 
in this
 
evaluation
 
are
 
reported
 
at
 
a
 
4.5 percent
 
to 6.0
 
percent
 
moisture
 
and
represent the saleable product from the Property.
 
Pricing
 
data
 
as
 
provided
 
by
 
Coronado
 
is
 
described
 
in
Section
 
16.2
.
 
The
 
pricing
 
data
 
assumes
respective HVA, HVB, specialty markets
 
and thermal FOB-mine prices of approximately $192, $170,
and
 
$227
 
per
 
metric
 
tonne
 
for
 
calendar
 
year
 
2023.
 
HVA,
 
HVB,
 
and
 
thermal
 
prices
 
respectively
decrease
 
to
 
approximately
 
$151,
 
$132,
 
and
 
$83
 
per
 
metric
 
tonne
 
through
 
year
 
2027,
 
and
 
then
increase to $271, $237, and $150 per metric tonne through year 2056.
The coal resource mapping and estimation
 
process, described in this report was used
 
as a basis for
the coal reserve
 
estimate.
 
Proven and
 
probable coal
 
reserves were
 
derived from
 
the defined coal
resource
 
considering
 
relevant
 
processing,
 
economic
 
(including
 
technical
 
estimates
 
of
 
capital,
revenue, and cost), marketing,
 
legal, environmental, socio-economic, and
 
regulatory factors and are
presented on a moist, recoverable
 
basis.
As is
 
customary in
 
the US,
 
the categories
 
for proven
 
and probable
 
coal reserves
 
are based
 
on the
distances
 
from
 
valid
 
points
 
of
 
measurement
 
as
 
determined
 
by
 
the
 
QPs
 
for
 
the
 
area
 
under
consideration.
 
For this
 
evaluation, measured
 
resource, which
 
may convert
 
to a
 
proven reserve,
 
is
based on a 0.4-kilometer radius from a valid point of observation.
Points of observation include exploration drill holes, gas wells, and
 
mine measurements which have
been
 
fully
 
vetted
 
and
 
processed
 
into
 
a
 
geologic
 
model.
 
The
 
geologic
 
model
 
is
 
based
 
on
 
seam
depositional modeling, the
 
interrelationship of overlying and
 
underlying strata on seam mineability,
seam thickness trends,
 
the impact of seam
 
structure (i.e., faulting),
 
intra-seam characteristics,
 
etc.
 
Once
 
the
 
geologic
 
model
 
was
 
completed,
 
a
 
statistical
 
analysis,
 
described
 
in
Section
 
11.1.1
 
was
conducted
 
and
 
a
 
0.4-kilometer
 
radius
 
from
 
a
 
valid
 
point
 
of
 
observation
 
was
 
selected
 
to
 
define
Measured Resources.
 
Likewise,
 
the distance
 
between 0.4
 
and 1.2 of
 
a kilometer
 
radius was
 
selected to
 
define Indicated
Resources.
 
Indicated Resources may convert
 
to Probable Reserves.
 
Inferred Resources (greater than a
 
1.2-kilometer radius from a
 
valid point of
 
observation) have been
excluded from Reserve consideration.
12.2
Mineral Reserves
Logan reserves were derived from multiple coal seams located on the
 
Property and shown in
Figure
7.1
.
 
Reserves
 
are
 
estimated
 
for
 
both
 
surface
 
and
 
underground
 
mine methods.
 
Surface
 
reserves
were estimated for three designated mine areas: Toney Fork, Buffalo Creek South, and Sugar Camp.
 
 
 
ex963p2i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
39
Underground
 
reserves
 
were
 
derived
 
from
 
six
 
seams
 
including
 
the
 
Upper
 
Winifrede,
 
Chilton
(Williamson),
 
Upper
 
Powellton,
 
Lower
 
Powellton,
 
No.
 
2
 
Gas-Lower
 
(Eagle)
 
and
 
Lower
 
War
 
Eagle.
 
The
 
Mt
 
of
 
demonstrated
 
reserves
 
are
 
sited
 
in
 
the
 
discussion
 
below.
 
Table
 
12-2
 
shows
 
the
demonstrated tonnage by Proven
 
and Probable category.
 
Individual seam maps are included in
Appendix B
 
herein.
 
12.2.1
Surface Reserves
Surface coal reserves of the Property include an estimated 32.5 Mt.
 
Each surface mine area -- Tony
Fork, Buffalo
 
Creek South
 
and Sugar
 
Camp --
 
includes coal
 
reserves from
 
multiple seams.
 
Two
 
of
the three
 
surface reserve
 
areas, Toney
 
Fork and
 
Buffalo
 
Creek South,
 
include both
 
permitted
 
and
non-permitted
 
tonnages,
 
where
 
Sugar
 
Camp
 
tonnage
 
is
 
not
 
permitted.
 
The
 
Property
 
has
 
five
surface
 
mine permits
 
for
 
contour
 
and highwall
 
mining.
 
Even
 
so, in
 
2022 there
 
was minor
 
surface
mine activity on just two of the five surface mine permits at Toney
 
Fork Mine No. 3 and Elk Lick.
 
12.2.1.1
Toney
 
Fork Surface
Toney
 
Fork
 
surface
 
area
 
is located
 
north
 
of Buffalo
 
Creek
 
on
 
the north
 
side of
 
the
 
Property.
 
The
Toney
 
Fork drainage
 
bisects much
 
of the
 
area which
 
includes contour
 
and highwall
 
miner reserve
from
 
six
 
seams.
 
The
 
Toney
 
Fork
 
reserve
 
includes
 
11.3
 
Mt
 
of
 
both
 
permitted
 
and
 
not-permitted
status.
 
There
 
is one
 
active permit
 
-- Toney
 
Fork Mine
 
No 3
 
(S-5007-09).
 
In 2022,
 
few
 
tons
 
were
mined from this permit.
 
Mine depletion from
 
surface and
 
underground mining,
 
seam dependent, exists
 
in all seams
 
of the
Toney
 
Fork reserve
 
which include the
 
Upper Coalburg, Lower
 
Coalburg, Lower
 
Dorothy,
 
Chilton A,
Upper Winifrede and Lower Winifrede seams.
 
12.2.1.2
Buffalo Creek South
Buffalo
 
Creek
 
South
 
surface
 
area
 
includes
 
an
 
estimated
 
15.0
 
Mt
 
from
 
projected
 
contour
 
and
highwall mines.
 
The reserve total includes both permitted and not-permitted tonnages.
 
Permitted
tonnages are
 
estimated from
 
four surface
 
mine permits
 
-- North
 
Fork Winifrede
 
Contour (S-5004-
17), Middle Fork
 
Surface (S-5004-22),
 
and two
 
at Elk Lick
 
(S-5014-10 &
 
S-5008-22).
 
In 2022, a
 
few
tonnes were mined and only at Elk Lick.
 
The highwall
 
mineable tonnage
 
is estimated
 
for six
 
seams with
 
adequate seam
 
heights which
 
include
the
 
Lower
 
Coalburg,
 
Lower
 
Dorothy,
 
Chilton,
 
Chilton
 
A,
 
Buffalo
 
Creek
 
and
 
the
 
Upper
 
Winifrede.
 
Contour mine
 
tonnage is
 
derived from
 
the highwall
 
mine seams, along
 
with four
 
additional seams
with acceptable
 
seam thickness.
 
They include the
 
Lower Clarion, Upper
 
Stockton, Lower
 
Stockton
and Upper Coalburg.
 
Mine depletion to various extents exists in the Buffalo
 
Creek South seams.
12.2.1.3
Sugar Camp Surface
Sugar
 
Camp surface
 
area is
 
a ridge
 
above
 
Sugar Camp
 
Branch
 
tributary of
 
Huff
 
Creek.
 
The Sugar
Camp
 
reserve
 
includes
 
6.2
 
Mt
 
with
 
a
 
suitable
 
surface
 
mine
 
strip
 
ratio.
 
Proposed
 
surface
 
mining
 
 
ex963p2i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
40
includes reserve from 12
 
seams beginning with
 
the Chilton A seam
 
down to the
 
S80 seam, each
 
with
an acceptable seam
 
height.
 
The seams included are
 
Chilton A, Upper Winifrede,
 
Lower Winifrede,
Chilton, Upper Cedar Grove, Middle Cedar Grove, Lower Cedar Grove, S132 seam, S120 seam, S110
seam, S84 seam and S80 seam.
 
No mine depletion exists in the seams of the reserve on the ridge.
 
12.2.2
Underground Reserves
Underground
 
coal
 
reserves
 
of the
 
Property
 
include an
 
estimated
 
38.1 Mt
 
derived
 
from
 
the
 
small
above-drainage deposits in
 
the Upper
 
Winifrede seam
 
along with
 
larger seam
 
deposits of
 
the deeper
Chilton, Upper
 
Powellton,
 
Lower Powellton,
 
No. 2
 
Gas-Lower (Eagle)
 
and Lower
 
War Eagle
 
seams.
 
Active underground
 
mines are
 
operating
 
in the
 
Upper Winifrede,
 
No. 2
 
Gas-Lower
 
and the
 
Lower
War Eagle seams.
12.2.2.1
Upper Winifrede (No 8) Seam
The Upper Winifrede seam includes two underground reserves, the permitted North Fork Mine (U-
5009-19)
 
and
 
a
 
not-permitted
 
proposed
 
Upper
 
Winifrede
 
mine.
 
The
 
active
 
North
 
Fork
 
Mine
 
is
situated on a narrow
 
ridge between two drainages,
 
has an average
 
seam thickness of 1.42 meters,
and includes an
 
estimated 0.2 Mt.
 
The Proposed Upper
 
Winifrede mine reserve
 
displays some seam
splitting, has an average
 
seam thickness of 1.64 meters,
 
and includes an estimated
 
1.8 Mt.
 
On the
Property,
 
the
 
Upper
 
Winifrede
 
seam
 
has
 
been
 
extensively
 
mined
 
from
 
both
 
surface
 
and
underground mining.
12.2.2.2
Chilton (Williamson) Seam
The
 
Chilton
 
seam
 
reserve
 
includes
 
an
 
estimated
 
5.4
 
Mt
 
from
 
two
 
proposed
 
mine
 
areas:
 
Camp
Branch
 
and Elk
 
Lick.
 
The average
 
seam height
 
for
 
the two
 
areas is
 
1.17 meters
 
and 1.06
 
meters,
respectively.
 
On
 
the
 
Property,
 
the
 
Chilton
 
seam
 
has
 
been
 
extensively
 
mined,
 
mainly
 
by
underground mining.
12.2.2.3
Upper Powellton (Upper Alma)
The Powellton
 
No 1
 
Mine permit provides
 
access to
 
the remaining
 
3.6 Mt of
 
the Upper
 
Powellton
reserve.
 
The
 
seam
 
has
 
an
 
average
 
thickness
 
of
 
nearly
 
1.12
 
meters.
 
The
 
mine
 
is
 
bound
 
by
 
the
property extent to the northeast and
 
thin coal from a seam
 
split to the
 
west.
 
The south end
 
of Mine
No. 1 is mined out.
 
Elsewhere, no prior Upper Powellton seam mining is noted on the Property.
12.2.2.4
Lower Powellton (Lower Alma)
The
 
Lower
 
Powellton
 
seam
 
reserve
 
includes
 
an
 
estimated
 
5.1
 
Mt
 
from
 
a
 
proposed
 
mine
 
area
situated
 
north
 
of
 
Toney
 
Fork.
 
In
 
the
 
mapped
 
resource
 
area,
 
the
 
interval
 
to
 
the
 
overlying
 
Upper
Powellton seam is in a range of 5.1 to 7.2 meters.
 
Therefore, only resources (exclusive
 
of reserves)
are projected
 
below the
 
Upper Powellton
 
underground
 
mine where
 
the two
 
seams overlap.
 
The
Lower Powellton
 
seam has
 
an average
 
reserve thickness
 
of 0.89
 
meters
 
and is
 
bound by
 
property
control to the north, by
 
low coal to the
 
west and south and
 
from overmining in the
 
Upper Powellton
seam to the east.
 
No prior Lower Powellton seam mining is noted on the Property.
 
 
ex963p2i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
41
12.2.2.5
No. 2 Gas-Lower (Eagle)
The No 2 Gas-Lower seam reserve includes an estimated 15.5 Mt.
 
The demonstrated total includes
both permitted and not permitted tonnes.
 
Two active mines access the reserve -- the Eagle No. 1 /
Toney Fork Mine (U-5013-11) from Toney Fork Drainage and the Muddy Bridge 1
 
& 2 Mine
 
(U-5034-
96, U-5035-96)
 
from Muddy
 
Bridge Branch
 
of Huff
 
Creek.
 
Mine boundaries
 
of the
 
two mines
 
are
immediately
 
adjacent
 
to
 
one
 
another
 
and
 
mine plans
 
maximize
 
the
 
mineable area.
 
The
 
average
seam
 
height
 
is
 
1.00
 
meter
 
and
 
1.52
 
meters
 
for
 
the
 
Eagle
 
No.
 
1
 
and
 
Muddy
 
Bridge
 
mines,
respectively.
 
On the Property,
 
the No. 2
 
Gas-Lower reserve
 
is limited by
 
low coal thickness
 
to the
east and seam outcrop along large drainages elsewhere.
 
Previous underground mining of the seam
is mapped immediately west of the Property.
 
12.2.2.6
Lower War Eagle
 
The
 
Lower
 
War
 
Eagle
 
seam reserve
 
includes an
 
estimated
 
6.5
 
Mt.
 
One underground
 
Lower
 
War
Eagle mine (U-4002-99B) provides
 
seam access from the
 
portal located along
 
Huff Creek.
 
Mapped
mine depletion is
 
from within the
 
existing mine.
 
The Lower War
 
Eagle reserve
 
extent is
 
limited to
the north by low coal.
 
12.3
Qualified Person’s Estimates
Reserve tonnage
 
estimates provided
 
herein report
 
coal reserves
 
derived from
 
the in-situ resource
tonnes presented
 
in
Table
 
11-3
, and
 
not in
 
addition to
 
coal resources.
 
Proven
 
and probable
 
coal
reserves
 
were
 
derived
 
from
 
the
 
defined
 
coal
 
resource
 
considering
 
relevant
 
mining,
 
processing,
infrastructure,
 
economic
 
(including
 
estimates
 
of
 
capital,
 
revenue,
 
and
 
cost),
 
marketing,
 
legal,
environmental,
 
socio-economic and regulatory
 
factors.
 
The coal reserves,
 
as shown in
Table
 
12-2
,
are
 
based on
 
a technical
 
evaluation
 
of the
 
geology and
 
a preliminary
 
feasibility
 
study
 
of the
 
coal
deposits.
 
The
 
extent
 
to
 
which
 
the
 
coal
 
reserves
 
may
 
be
 
affected
 
by
 
any
 
known
 
environmental,
permitting,
 
legal,
 
title,
 
socio-economic,
 
marketing,
 
political,
 
or
 
other
 
relevant
 
issues
 
has
 
been
reviewed rigorously.
 
Similarly, the extent to which the estimates of coal reserves may be
 
materially
affected
 
by
 
mining,
 
metallurgical,
 
infrastructure
 
and
 
other
 
relevant
 
factors
 
has
 
also
 
been
considered.
 
Coal reserves are presented on a ROM basis in
Table 12-1.
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
42
Table 12-1:
 
Coal Reserves Summary (ROM Basis (Moist)) as of December 31, 2022 (Mt)
 
Demonstrated Coal Reserves (Mt, Moist ROM)
Quality (Dry)
 
By Reliability Category
By Mining Type
By Control Type
Area / Mine
Proved
Probable
Total
Surface
UG
Owned
Leased
Ash
Sulfur
Vol
Logan Mine Complex
101.4
36.7
138.1
37.3
100.8
0.0
138.1
51
0.9
19
In
 
the
 
financial
 
analysis
 
some
 
of
 
the
 
projected
 
mines
 
were
 
not
 
economically
 
viable.
 
The
 
tonnes
projected to be mined from these locations have
 
not been included in the Reserve Base.
Table 12-2:
 
Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022 (Mt)
 
Demonstrated Coal Reserves (Wet Tons,
 
Washed or Direct Shipped, MT)
Quality (Dry Basis)
 
By Reliability Category
By Mining Type
By Control Type
Property
Proven
Probable
Total
Surface
UG
Owned
Leased
Ash%
Sulfur%
VM%
Logan County Complex
53.3
17.4
70.6
32.5
38.1
0.0
70.6
8
0.9
36
Note: Marketable reserve tonnes are reported on a moist basis, including a combination of surface and inherent moisture.
 
The combination of
surface and inherent moisture is modeled between 4.5 and 6-percent, depending upon mining method.
 
Actual product moisture is
dependent upon multiple geological factors, operational factors, and product contract specifications and can exceed 8-percent.
 
As such, the
modeled moisture values provide a level of conservatism for reserve reporting.
The
 
results
 
of
 
this
 
TRS
 
define
 
an
 
estimated
 
70.6
 
Mt
 
of
 
proven
 
and
 
probable
 
marketable
 
coal
reserves.
 
Of that total, 75 percent are proven, and 25 percent are probable.
 
All 70.6 Mt are leased
coal reserves and
 
are assigned.
 
Approximately 61.6
 
Mt of reserves are
 
considered suitable for
 
the
metallurgical coal market
 
and 9.0 Mt are projected to be sold into the thermal coal market.
12.4
Qualified Person’s Opinion
The
 
estimate
 
of coal
 
reserves was
 
determined
 
in accordance
 
with the
 
JORC
 
Code along
 
with SEC
Regulation S-K 1300.
The LOM mining
 
plan for
 
Logan was prepared
 
to the
 
level of
 
preliminary feasibility.
 
Mine projections
were
 
prepared,
 
and
 
timing
 
scheduled
 
to
 
match
 
production
 
with
 
coal
 
seam
 
characteristics.
 
Production timing was carried
 
out from current locations to depletion
 
of the coal
 
reserve area.
 
Coal
reserve estimates could be materially affected
 
by the risk factors described in
Section 22.2
.
Based on the Preliminary Feasibility Study
 
and the attendant Economic Review, the QPs believe this
is a fair and accurate calculation of the Logan
 
coal reserves.
13
Mining Methods
Nine underground
 
and three
 
surface mining
 
areas were
 
modeled and
 
tested
 
economically.
 
Once
the Resources were calculated, mine plans were created to project operating each resource area to
depletion, with crews
 
and equipment scheduled to
 
move to subsequent
 
mining areas as depletion
occurs.
 
Underground mine operations
 
are projected to
 
be exhausted in
 
2045, surface mines
 
deplete
in 2055 and the highwall miners finish in 2056.
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
43
13.1
Geotech and Hydrology
Mining
 
plans
 
for
 
potential
 
underground
 
mines
 
were
 
developed
 
by
 
Coronado
 
and
 
MM&A.
 
Pillar
stability
 
was
 
tested
 
by MM&A
 
using the
Analysis of
 
Coal Pillar
 
Stability
 
(ACPS)
 
program
 
that
 
was
developed by the
National Institute for Occupational Safety and
 
Health (
NIOSH
)
.
 
MM&A reviewed
the results
 
from the ACPS
 
and ALPS analysis
 
and considered them
 
in the development
 
of the LOM
plan.
For the HWM operation, Mining cuts are approximately
 
2.9 meters wide, and cuts are typically laid
out on approximately 5.03-meter centers.
 
A 2.1-meter to 2.4-meter solid coal fender is left
 
in place
between
 
cuts.
 
The
 
mining
 
plan
 
provides
 
that
 
larger
 
barrier
 
pillars
 
be
 
provided
 
periodically,
depending on overburden depth and characteristics
 
and the immediate roof composition, typically
after 15
 
to 20
 
cuts.
 
Although this
 
plan, with
 
minor variations,
 
is common
 
throughout Appalachia,
specific
 
rock
 
and
 
coal
 
strength
 
information
 
is used
 
to
 
verify
 
whether
 
or
 
not
 
this
 
plan
 
provided
 
a
sufficient factor of safety.
Hydrology
 
has not
 
been an
 
issue of
 
concern at
 
Logan.
 
Based on
 
numerous
 
site visits
 
to both
 
the
surface and
 
underground portions
 
of the
 
Property by
 
the QPs,
 
it has
 
been determined
 
that this
 
is
not
 
a
 
significant
 
concern.
 
Mining
 
of
 
future
 
reserves
 
is
 
projected
 
to
 
occur
 
in
 
areas
 
which
 
exhibit
similar hydrogeological characteristics
 
as those formerly mined areas.
13.2
Production Rates
Operations
 
at
 
Logan
 
by Coronado
 
and
 
its predecessors
 
have
 
been on-going
 
for
 
many
 
years.
 
The
mine plan and productivity expectations reflect historical performance and efforts have been made
to adjust the plan to reflect future conditions.
 
MM&A is confident that the mine plan is reasonably
representative
 
to
 
provide
 
an
 
accurate
 
estimation
 
of
 
coal
 
reserves.
 
Mine
 
development
 
and
operation have not been optimized within the TRS.
Carlson Mining software was
 
used by MM&A to
 
generate mine
 
plans for the mineable
 
coal seams.
 
Mine
 
plans
 
were
 
sequenced based
 
on productivity
 
schedules provided
 
by Coronado,
 
which were
based
 
on
 
historically
 
achieved
 
productivity
 
levels.
 
All
 
production
 
forecasting
 
ties
 
assumed
production
 
rates
 
to
 
geological
 
models
 
as
 
constructed
 
by MM&A’s
 
team
 
of
 
geologists
 
and
 
mining
engineers.
The projected underground mines are set up similarly to the four currently active operations.
 
Each
mine is
 
scheduled to
 
operate
 
one to
 
three production
 
sections.
 
All sections
 
are configured
 
as full
supersections with two continuous
 
miners per section.
 
In all cases,
 
mines are forecasted to produce
coal two or three shifts each day.
 
In most cases the third shift is reserved for maintenance and belt
and
 
power
 
moves.
 
Production
 
is scheduled
 
Monday
 
through
 
Friday
 
each week,
 
and
 
every
 
other
Saturday.
Three surface resource areas were modeled.
 
Mining operations are projected to utilize area
 
mining
as well as contour mining (
CTR
) methods with an emphasis on creating highwall for highwall mining
 
 
ex963p2i0
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
44
activity.
 
The projected operations will
 
employ two existing
 
front-end loaders capable
 
of a
 
combined
production rate
 
of approximately
 
8,900 bcm/hr with
 
supplemental assistance
 
of 6 dozers
 
that can
generate an additional 700 bcm/hr providing their spoil placement does not interfere with planned
highwall mining activity.
 
The older, higher-hour front end loader will
 
be replaced in
 
early 2023
 
with
a higher production hydraulic excavator
 
that will increase the capability of the loading machines to
11,300 bcm/hr.
 
The dozers will continue supplementing the loading production on a periodic basis
as described previously.
 
The potential production
 
level of combined
 
machines is not projected
 
to
be
 
achieved
 
until
 
2024
 
and
 
not
 
consistently
 
until
 
2027
 
due
 
to
 
lack
 
of
 
sufficient
 
working
areas.
 
Sufficient reserves allow mining to continue to the year 2055.
The models assume
 
that the operations
 
will work two,
 
10-hour production shifts,
 
5 days per
 
week
plus every
 
other Saturday,
 
with sufficient
 
staffing
 
to float
 
vacation
 
during the
 
year.
 
A total
 
of 82
employees are assumed for the surface mines at full production.
Coals from
 
the surface
 
operations
 
are hauled
 
to the
 
loadout for
 
direct ship
 
or to
 
the preparation
plant for washing ultimately to be blended to shipment’s
 
specifications.
 
Saleable product from the
surface
 
operations
 
is
 
projected
 
to
 
be
 
sold
 
primary
 
into
 
the
 
thermal
 
coal
 
market
 
on
 
a
 
raw
 
basis;
however,
 
some production is planned to be washed for the metallurgical
 
coal market.
 
The three
 
areas planned
 
for highwall
 
mining are
 
assumed to
 
be mined
 
by a
 
contractor;
 
therefore,
the contractor
 
costs included
 
in the
 
financial model
 
assume that
 
the contractor
 
is responsible
 
for
staffing those operations along with providing
 
necessary equipment capital.
Spoil for
 
final highwall
 
reclamation is
 
expected to
 
come from
 
strategic
 
placement of
 
spoil on
 
pre-
existing benches by
 
haul trucks
 
such that
 
they are within
 
the push
 
distance of the
 
reclamation dozer.
 
13.3
Mining Related Requirements
13.3.1
Underground
A mine plan with
 
sequenced mining projections was prepared for each logical
 
mining unit.
 
For each
mine
 
plan,
 
the
 
appropriate
 
number
 
of
 
production
 
units
 
is
 
selected
 
for
 
the
 
resource
 
area,
 
and
 
a
productivity
 
level
 
assigned,
 
expressed
 
in
 
meters
 
of
 
advance
 
per
 
unit-shift
 
of
 
production.
 
The
productivity is
 
based on
 
the equipment
 
and personnel
 
configuration,
 
mining height
 
and expected
physical conditions.
 
13.3.2
Surface Mine
A
 
mine
 
plan
 
with
 
sequenced
 
mining
 
projections
 
was
 
prepared
 
for
 
each
 
logical
 
mining
 
unit.
 
The
mobile equipment spreads
 
selected are representative of
 
Coronado’s equipment fleets and
 
deemed
to be appropriate for the local mining conditions.
13.3.3
HWM
Contract HWM units
 
are available for assignment
 
to contour surface mining
 
pits in
 
the Logan County
Division.
 
HWM
 
substantially
 
increases
 
coal
 
recovery
 
from
 
contour
 
mining benches
 
and
 
is ideally
 
 
ex963p2i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
45
suited for coal resource
 
areas characterized
 
by thin coal seams and irregular
 
or narrow boundaries
that
 
are
 
not well-suited
 
for
 
underground
 
mining.
 
The
 
contour
 
mining bench
 
will extend
 
into
 
the
highwall to the
 
maximum overburden
 
stripping ratio that
 
is economically feasible
 
or the minimum
bench requirement for operation of the HWM unit.
 
13.4
Required Equipment and Personnel
13.4.1
Underground Mines
13.4.1.1
Powellton No. 1
The Powellton
 
No. 1
 
Mine is
 
temporarily
 
inactive.
 
It is
 
scheduled to
 
resume production
 
with one
continuous mine section
 
in the second
 
quarter of
 
2024 with an
 
additional continuous mining
 
section
coming online
 
in the fourth
 
quarter of
 
2024.
 
The Upper Powellton
 
seam is accessed
 
via a shallow
slope and crop.
 
This mine produces metallurgical coal from leased mineral.
Production
 
is
 
scheduled
 
for
 
approximately
 
265
 
days
 
each
 
year,
 
which
 
represents
 
production
 
on
Monday
 
through
 
Friday
 
and
 
every
 
other
 
Saturday.
 
On
 
each
 
day,
 
two
 
production
 
sections
 
are
scheduled
 
to
 
produce
 
coal
 
on
 
two
 
shifts;
 
the
 
third
 
shift
 
is
 
reserved
 
for
 
maintenance
 
and
 
mine
conveyor
 
belt and power
 
moves.
 
The production section
 
is configured
 
as a full
 
super section with
two continuous
 
miners.
 
Productivity is
 
planned at
 
the rate
 
of 61.0 meters
 
of advance
 
and retreat
per shift of operation.
 
A total of 116 employees are assigned to the mine.
Principal production equipment includes
 
two continuous miners, two roof bolters, four shuttle
 
cars,
and
 
two
 
scoops
 
for
 
each
 
operating
 
section.
 
Coal
 
is
 
extracted
 
from
 
the
 
production
 
face
 
with
 
the
continuous miner and hauled to the mine conveyor in shuttle cars.
 
At the conveyor belt, the coal is
discharged
 
from
 
the
 
shuttle
 
cars
 
onto
 
a
 
feeder
 
breaker
 
for
 
transfer
 
onto
 
the
 
conveyor.
 
The
conveyors
 
carry
 
the
 
coal
 
to
 
the
 
outside,
 
where
 
it
 
is
 
transported
 
via
 
overland
 
conveyor
 
to
 
the
preparation plant and load-out.
 
The Powellton
 
No. 1
 
Mine is
 
temporarily an
 
inactive facility;
 
however,
 
all necessary
 
infrastructure
and utilities
 
remain in
 
place.
 
All necessary
 
permits have
 
been obtained.
 
Estimated
 
expenditures
for site
 
closure and
 
reclamation are
 
included in the
 
financial model
 
for this
 
site.
 
Expected annual
production
 
averages
 
approximately
 
350,000
 
marketable
 
tonnes.
 
The
 
mine
 
is
 
scheduled
 
to
terminate during 2034.
13.4.1.2
Lower War Eagle
The Lower
 
War
 
Eagle Mine
 
is active
 
with two
 
production
 
sections.
 
The Lower
 
War
 
Eagle seam
 
is
accessed
 
via
 
an
 
existing
 
slope.
 
This
 
mine
 
is
 
a
 
metallurgical
 
coal
 
operation
 
with
 
all
 
remaining
production on leased mineral property.
Production
 
is
 
scheduled
 
for
 
approximately
 
265
 
days
 
each
 
year,
 
which
 
represents
 
production
 
on
Monday
 
through
 
Friday
 
and
 
every
 
other
 
Saturday.
 
On
 
each
 
day,
 
three
 
production
 
sections
 
are
scheduled
 
to
 
produce
 
coal
 
on
 
two
 
shifts;
 
the
 
third
 
shift
 
is
 
reserved
 
for
 
maintenance
 
and
 
mine
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
46
conveyor belt and power
 
moves.
 
The sections are
 
configured as super sections
 
with two continuous
miners available
 
for production.
 
Productivity is planned at
 
the rate of
 
79.2 meters of
 
advance and
retreat per shift of operation.
 
A total of 139 employees are assigned to the mine.
Principal production equipment includes
 
two continuous miners, two roof bolters, four shuttle
 
cars,
and
 
two
 
scoops
 
for
 
each
 
operating
 
section.
 
Coal
 
is
 
extracted
 
from
 
the
 
production
 
face
 
with
 
the
continuous miner and hauled to the mine conveyor in shuttle cars.
 
At the conveyor belt, the coal is
discharged
 
from
 
the
 
shuttle
 
cars
 
onto
 
a
 
feeder
 
breaker
 
for
 
transfer
 
onto
 
the
 
conveyor.
 
The
conveyors
 
carry the coal outside,
 
where it is transported
 
to the preparation
 
plant and load-out
 
via
overland conveyor.
 
The
 
Lower War
 
Eagle
 
Mine is
 
an operating
 
facility;
 
all necessary
 
infrastructure
 
and utilities
 
are in
place.
 
All
 
necessary
 
permits
 
have
 
been
 
obtained.
 
Estimated
 
expenditures
 
for
 
site
 
closure
 
and
reclamation are included in
 
the financial model for this
 
site.
 
Expected annual production averages
approximately 479,000 marketable
 
tonnes.
 
The mine is scheduled to terminate during 2036.
 
13.4.1.3
Eagle No. 1/Toney
 
Fork #1
The Eagle
 
No. 1
 
(Toney
 
Fork #1)
 
Mine is
 
an active
 
mine in
 
the Eagle
 
(No. 2
 
Gas Lower)
 
seam with
two production sections.
 
This mine is
 
a metallurgical coal operation on
 
leased mineral property and
is accessed via drift entries from the outcrop.
Production
 
is
 
scheduled
 
for
 
approximately
 
265
 
days
 
each
 
year,
 
which
 
represents
 
production
 
on
Monday
 
through
 
Friday
 
and
 
every
 
other
 
Saturday.
 
On
 
each
 
day,
 
three
 
production
 
sections
 
are
scheduled
 
to
 
produce
 
coal
 
on
 
two
 
shifts;
 
the
 
third
 
shift
 
is
 
reserved
 
for
 
maintenance
 
and
 
mine
conveyor belt and power
 
moves.
 
Both sections are full super sections with two
 
continuous miners
per section.
 
Productivity is planned at the
 
rate of 64.0 meters
 
of advance per shift (76.2 meters
 
of
retreat) for the super sections.
 
A total of 137 employees are assigned to the mine.
The principal production equipment
 
per section includes two
 
continuous miners, two
 
roof bolters,
four shuttle
 
cars, and two
 
scoops.
 
Coal is extracted
 
from the production
 
face with the
 
continuous
miner and hauled to the mine conveyor in shuttle cars.
 
At the conveyor belt, the coal is discharged
onto a feeder breaker
 
for transfer onto
 
the conveyor.
 
The conveyors carry the coal outside, where
it is stacked on the ground to await truck transport
 
to the preparation plant and load-out.
The Eagle
 
No. 1
 
Mine is an
 
operating facility;
 
all necessary
 
infrastructure
 
and utilities
 
are in
 
place.
 
All
 
necessary
 
permits
 
have
 
been
 
obtained;
 
the
 
underground
 
footprint
 
area
 
expansion
 
is pending
final
 
approval.
 
Estimated
 
expenditures
 
for
 
mine closure
 
and site
 
reclamation
 
are
 
included in
 
the
financial model.
Expected annual production averages approximately
 
517,000 marketable tonnes.
The mine is scheduled to terminate during 2045.
 
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
47
13.4.1.4
Muddy Bridge
The
 
Muddy
 
Bridge
 
Mine
 
is
 
an
 
active
 
mine
 
in
 
the
 
Eagle
 
(No.
 
2
 
Gas
 
Lower)
 
seam.
 
This
 
mine
 
is
 
a
metallurgical
 
coal operation
 
on leased
 
mineral
 
property and
 
is accessed
 
via drift
 
entries from
 
the
outcrop.
Production
 
is
 
scheduled
 
for
 
approximately
 
265
 
days
 
each
 
year,
 
which
 
represents
 
production
 
on
Monday
 
through
 
Friday
 
plus
 
every
 
other
 
Saturday.
 
On
 
each
 
day,
 
two
 
production
 
sections
 
are
scheduled
 
to
 
produce
 
coal
 
on
 
two
 
shifts;
 
the
 
third
 
shift
 
is
 
reserved
 
for
 
maintenance
 
and
 
mine
conveyor
 
belt
 
and
 
power
 
moves.
 
The
 
sections
 
are
 
configured
 
as
 
full
 
super
 
sections
 
with
 
two
continuous miners
 
available for
 
production on each
 
section.
 
Productivity is planned
 
at the rate
 
of
76.2 meters of advance and retreat per shift of operation.
 
A total of 115 employees are assigned
 
to
the mine.
Principal production equipment includes
 
two continuous miners, two roof bolters, four shuttle
 
cars,
and
 
two
 
scoops
 
for
 
each
 
operating
 
section.
 
Coal
 
is
 
extracted
 
from
 
the
 
production
 
face
 
with
 
the
continuous miner and hauled to
 
the mine conveyor
 
via shuttle cars.
 
At the conveyor
 
belt, the coal
is
 
discharged
 
from
 
the
 
haulage
 
units
 
onto
 
a
 
feeder
 
breaker
 
for
 
transfer
 
onto
 
the
 
conveyor.
 
The
conveyors
 
carry the coal to
 
the outside, where it
 
is stacked
 
on the ground to
 
await truck transport
to the Lower War Eagle mine for placement onto
 
the overland conveyor leading to the preparation
plant and load-out.
The Muddy Bridge Mine
 
is an operating facility; all
 
necessary infrastructure and utilities are
 
in place.
 
All necessary permits have
 
been obtained.
 
Coal mining permits are routinely
 
obtained.
 
Estimated
expenditures for mine closure and site reclamation are
 
included in the financial model.
Expected
 
annual
 
production
 
averages
 
approximately
 
603,000
 
marketable
 
tonnes
 
at
 
steady
 
state
production levels.
The mine is scheduled to terminate during 2028.
13.4.1.5
Elklick Chilton
The proposed
 
Elklick Chilton
 
Mine is
 
scheduled to
 
begin production
 
in 2029.
 
The Chilton
 
seam is
accessed via drift
 
entry.
 
The seam is
 
above drainage.
 
This mine is
 
projected to
 
be a metallurgical
coal operation on leased mineral property.
 
Production
 
is
 
scheduled
 
for
 
approximately
 
265
 
days
 
each
 
year,
 
which
 
represents
 
production
 
on
Monday
 
through
 
Friday
 
plus
 
every
 
other
 
Saturday.
 
On
 
each
 
day,
 
one
 
production
 
section
 
is
scheduled
 
to
 
produce
 
coal
 
on
 
two
 
shifts;
 
the
 
third
 
shift
 
is
 
reserved
 
for
 
maintenance
 
and
 
mine
conveyor
 
belt
 
and
 
power
 
moves.
 
The
 
sections
 
are
 
configured
 
as
 
full
 
super
 
sections
 
with
 
two
continuous miners
 
available for
 
production on each
 
section.
 
Productivity is planned
 
at the rate
 
of
73.2 meters
 
of advance
 
(109.8 meters
 
of retreat)
 
per shift
 
of operation.
 
A total
 
of 70
 
employees
are assigned to the mine.
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
48
Principal production equipment includes
 
two continuous miners, two roof bolters, four shuttle
 
cars,
and two scoops.
 
Coal is extracted from
 
the production face with the
 
continuous miner and hauled
to the mine conveyor via shuttle cars.
 
At the conveyor belt, the coal is discharged from the haulage
units onto
 
a feeder
 
breaker
 
for transfer
 
onto the
 
conveyor.
 
The conveyors
 
carry the coal
 
outside,
where it is stacked on the ground to await
 
truck transport to the preparation plant and load-out.
 
The Elklick Chilton
 
mine is
 
a permitted mine
 
with surface infrastructure in
 
place.
 
The proposed mine
is located in an area
 
with a long
 
history of coal mining,
 
with numerous permitted operations in close
proximity.
 
Estimated
 
expenditures
 
for
 
mine
 
closure
 
and
 
site
 
reclamation
 
are
 
included
 
in
 
the
financial model.
Expected
 
annual
 
production
 
averages
 
approximately
 
301,000
 
marketable
 
tonnes
 
at
 
steady
 
state
production levels.
The mine is scheduled to begin production in 2029 and terminate during 2041.
13.4.1.6
Camp Branch Chilton
The
 
Camp
 
Branch
 
Chilton
 
Mine
 
is
 
proposed
 
mine
 
in
 
the
 
Chilton
 
seam
 
which
 
is
 
accessed
 
via
 
drift
entry from
 
the outcrop
 
and is scheduled
 
to begin production
 
in 2029.
 
This mine is
 
a metallurgical
coal operation on leased mineral property.
Production
 
is
 
scheduled
 
for
 
approximately
 
265
 
days
 
each
 
year,
 
which
 
represents
 
production
 
on
Monday
 
through
 
Friday
 
plus
 
every
 
other
 
Saturday.
 
On
 
each
 
day,
 
one
 
production
 
section
 
is
scheduled
 
to
 
produce
 
coal
 
on
 
two
 
shifts;
 
the
 
third
 
shift
 
is
 
reserved
 
for
 
maintenance
 
and
 
mine
conveyor
 
belt
 
and
 
power
 
moves.
 
The
 
sections
 
are
 
configured
 
as
 
full
 
super
 
sections
 
with
 
two
continuous miners
 
available for
 
production on each
 
section.
 
Productivity is planned
 
at the rate
 
of
73.2 meters
 
of advance
 
(109.8 meters
 
of retreat)
 
per shift
 
of operation.
 
A total
 
of 70
 
employees
are assigned to the mine.
Principal production equipment includes
 
two continuous miners, two roof bolters, four shuttle
 
cars,
and two scoops.
 
Coal is extracted from
 
the production face with the
 
continuous miner and hauled
to the mine conveyor via shuttle cars.
 
At the conveyor belt, the coal is discharged from the haulage
units onto
 
a feeder
 
breaker
 
for transfer
 
onto the
 
conveyor.
 
The conveyors
 
carry the coal
 
outside,
where it is stacked on the ground to await
 
truck transport to the preparation plant
 
and load-out.
Due
 
to
 
the
 
projected
 
starting
 
date
 
for
 
the
 
Camp
 
Branch
 
Chilton
 
Mine,
 
no
 
detailed
 
design
 
of
infrastructure or surface facilities has been completed to date.
 
The proposed mine is located in the
Appalachian Basin, which has an extensive history (>100 years)
 
of coal mining.
 
There is a sufficient
population
 
base
 
within
 
commuting
 
distance
 
of
 
the
 
proposed
 
operation;
 
no
 
Camp
 
or
 
Town
construction will
 
be required.
 
Estimated mine
 
access and utility
 
capital expenditures
 
are included
in the financial model for the mine.
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
49
The proposed Camp Branch
 
Chilton Mine has an existing
 
permit.
 
Estimated expenditures
 
for mine
closure and site reclamation are included in the financial model.
Expected
 
annual
 
production
 
averages
 
approximately
 
321,000
 
marketable
 
tonnes
 
at
 
steady
 
state
production levels.
The mine is scheduled to begin production in 2029 and terminate during 2033.
13.4.1.7
Winifrede
The active Winifrede (North
 
Fork) Mine is located in
 
the Upper Winifrede seam and is
 
accessed via
drift along the outcrop.
 
This mine is a metallurgical coal operation on leased mineral property.
 
Production
 
is
 
scheduled
 
for
 
approximately
 
265
 
days
 
each
 
year,
 
which
 
represents
 
production
 
on
Monday
 
through
 
Friday
 
plus
 
every
 
other
 
Saturday.
 
On
 
each
 
day,
 
one
 
production
 
section
 
is
scheduled
 
to
 
produce
 
coal
 
on
 
two
 
shifts;
 
the
 
third
 
shift
 
is
 
reserved
 
for
 
maintenance
 
and
 
mine
conveyor belt
 
and power moves.
 
The section is configured as
 
a super section with two continuous
miners per section
 
available for
 
production.
 
Productivity is planned at
 
38.1 meters to
 
45.1 meters
of advance (53.4
 
meters to
 
63.1 meters of
 
retreat) per
 
shift.
 
A total of
 
47 employees are
 
assigned
to the mine.
Principal production equipment per section includes two continuous miners,
 
two roof bolters, four
shuttle cars, and one
 
scoop.
 
Coal is extracted from
 
the production face with the continuous
 
miner
and hauled to the
 
mine conveyor
 
in shuttle cars.
 
At the conveyor
 
belt, the coal is discharged
 
from
the shuttle cars onto a feeder breaker for transfer
 
onto the conveyor.
 
The conveyors carry the coal
outside,
 
where
 
it is
 
stacked
 
on
 
the
 
ground
 
to
 
await
 
truck
 
transport
 
to
 
the
 
preparation
 
plant
 
and
load-out.
The active Winifrede Mine at
 
North Fork is permitted.
 
Estimated expenditures for mine closure and
site reclamation are included in the financial model.
Expected
 
annual
 
production
 
averages
 
approximately
 
190,000
 
marketable
 
tonnes
 
at
 
steady
 
state
levels.
 
The mine is scheduled to terminate during 2023.
13.4.1.8
Lower Powellton
The
 
proposed
 
Lower
 
Powellton
 
Mine
 
is
 
scheduled
 
to
 
begin
 
production
 
in
 
2033.
 
The
 
Lower
Powellton
 
seam is accessed
 
via a proposed
 
drift along the
 
outcrop.
 
This mine is
 
projected to
 
be a
metallurgical coal operation on leased mineral
 
property.
Production
 
is
 
scheduled
 
for
 
approximately
 
265
 
days
 
each
 
year,
 
which
 
represents
 
production
 
on
Monday
 
through
 
Friday
 
plus
 
every
 
other
 
Saturday.
 
On
 
each
 
day,
 
two
 
production
 
sections
 
are
scheduled
 
to
 
produce
 
coal
 
on
 
two
 
shifts;
 
the
 
third
 
shift
 
is
 
reserved
 
for
 
maintenance
 
and
 
mine
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
50
conveyor
 
belt
 
and
 
power
 
moves.
 
Both
 
sections
 
are
 
configured
 
as
 
a
 
super
 
section
 
with
 
two
continuous miners
 
per section
 
available for
 
production.
 
Productivity is
 
planned at
 
73.2 meters
 
of
advance per
 
shift (85.4
 
meters
 
of retreat
 
per shift).
 
A total
 
of 123
 
employees are
 
assigned to
 
the
mine during steady state production.
Principal production equipment per section includes two continuous miners,
 
two roof bolters, four
shuttle cars, and
 
one scoop.
 
Coal is extracted from
 
the production face with the continuous
 
miner
and hauled to the
 
mine conveyor
 
in shuttle cars.
 
At the conveyor
 
belt, the coal is discharged
 
from
the shuttle cars onto a feeder breaker for transfer
 
onto the conveyor.
 
The conveyors carry the coal
outside,
 
where
 
it is
 
stacked
 
on
 
the
 
ground
 
to
 
await
 
truck
 
transport
 
to
 
the
 
preparation
 
plant
 
and
load-out.
 
The truck haul cost is estimated to be $1.99 per tonne.
Due
 
to
 
the
 
projected
 
starting
 
date
 
for
 
the
 
Lower
 
Powellton
 
Mine,
 
no
 
detailed
 
design
 
of
infrastructure or surface facilities has been completed to date.
 
The proposed mine is located in the
Appalachian Basin, which has an extensive history (>100 years)
 
of coal mining.
 
There is a sufficient
population
 
base
 
within
 
commuting
 
distance
 
of
 
the
 
proposed
 
operation;
 
no
 
Camp
 
or
 
Town
construction will
 
be required.
 
Estimated mine
 
access and utility
 
capital expenditures
 
are included
in the financial model for the mine.
Due
 
to
 
the
 
projected
 
start-up
 
date
 
of
 
the
 
Lower
 
Powellton
 
Mine,
 
no
 
permit
 
work
 
has
 
been
completed to date.
 
The proposed mine is located in an area with a
 
long history of coal mining, with
numerous
 
permitted
 
operations
 
in
 
close
 
proximity.
 
Coal
 
mining
 
permits
 
are
 
routinely
 
obtained.
 
Estimated
 
expenditures for
 
mine closure
 
and site
 
reclamation
 
are included
 
in the
 
financial model
for each mine or plant site.
Expected
 
annual
 
production
 
averages
 
approximately
 
501,000
 
marketable
 
tonnes
 
at
 
steady
 
state
levels.
 
The mine is scheduled to begin production in 2033 and terminate during 2044.
13.4.1.9
Upper Winifrede
The proposed
 
Upper Winifrede
 
Mine is
 
scheduled to
 
begin production
 
in 2037.
 
The Upper
 
Winifrede
seam is accessed via
 
a proposed drift along
 
the outcrop.
 
This mine is
 
projected to be a metallurgical
coal operation on leased mineral property.
Production
 
is
 
scheduled
 
for
 
approximately
 
265
 
days
 
each
 
year,
 
which
 
represents
 
production
 
on
Monday
 
through
 
Friday
 
plus
 
every
 
other
 
Saturday.
 
On
 
each
 
day,
 
one
 
production
 
section
 
is
scheduled
 
to
 
produce
 
coal
 
on
 
two
 
shifts;
 
the
 
third
 
shift
 
is
 
reserved
 
for
 
maintenance
 
and
 
mine
conveyor
 
belt
 
and
 
power
 
moves.
 
The
 
sections
 
are
 
configured
 
as
 
full
 
super
 
sections
 
with
 
two
continuous miners
 
available for
 
production on each
 
section.
 
Productivity is planned
 
at the rate
 
of
73.2 meters of advance per shift of operation.
 
A total of 70 employees are assigned to the mine.
 
 
ex963p2i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
51
Principal production equipment includes
 
two continuous miners, two roof bolters, four shuttle
 
cars,
and two scoops.
 
Coal is extracted from
 
the production face with the
 
continuous miner and hauled
to the mine
 
conveyor in
 
shuttle cars.
 
At the conveyor
 
belt, the coal
 
is discharged from
 
the shuttle
cars
 
onto
 
a feeder
 
breaker
 
for transfer
 
onto the
 
conveyor.
 
The conveyors
 
carry the
 
coal outside,
where it
 
is stacked
 
on the
 
ground to
 
await truck
 
transport to
 
the preparation
 
plant and
 
load-out.
 
The truck haul cost is estimated to be $4.03 per tonne.
Due
 
to
 
the
 
projected
 
starting
 
date
 
for
 
the
 
Upper
 
Winifrede
 
Mine,
 
no
 
detailed
 
design
 
of
infrastructure or surface facilities has been completed to date.
 
The proposed mine is located in the
Appalachian Basin, which has an extensive history (>100 years)
 
of coal mining.
 
There is a sufficient
population
 
base
 
within
 
commuting
 
distance
 
of
 
the
 
proposed
 
operation;
 
no
 
Camp
 
or
 
Town
construction will
 
be required.
 
Estimated mine
 
access and utility
 
capital expenditures
 
are included
in the financial model for the mine.
Due
 
to
 
the
 
projected
 
start-up
 
date
 
of
 
the
 
Upper
 
Winifrede
 
Mine,
 
no
 
permit
 
work
 
has
 
been
completed to date.
 
The proposed mine is located in an area with a
 
long history of coal mining, with
numerous
 
permitted
 
operations
 
in
 
close
 
proximity.
 
Coal
 
mining
 
permits
 
are
 
routinely
 
obtained.
 
Estimated
 
expenditures for
 
mine closure
 
and site
 
reclamation
 
are included
 
in the
 
financial model
for each mine or plant site.
Expected
 
annual
 
production
 
averages
 
approximately
 
413,000
 
marketable
 
tonnes
 
at
 
steady
 
state
levels.
 
The mine is scheduled to begin production in 2037 and terminate during 2041.
At
 
the
 
underground
 
mines,
 
ventilation
 
fans
 
are
 
installed
 
to
 
provide
 
a
 
sufficient
 
volume
 
of
 
air
 
to
ventilate
 
production
 
sections,
 
coal
 
haulage
 
and
 
transport
 
entries,
 
battery
 
charging
 
stations,
 
and
transformers in accordance with approved plans.
 
High-voltage cables deliver power throughout
 
the
mine
 
where
 
transformers
 
reduce
 
voltage
 
for
 
specific
 
equipment
 
requirements.
 
The
 
Mine
Improvement
 
and
 
New
 
Emergency
 
Response
 
Act
 
of
 
2006
 
(
MINER
 
Act
)
 
requires
 
that
 
carbon
monoxide
 
detection
 
systems
 
be installed
 
along mine
 
conveyor
 
belts
 
and that
 
electronic
 
two-way
tracking
 
and
 
communications
 
systems
 
be
 
installed
 
throughout
 
underground
 
mines.
 
Water
 
is
required
 
to
 
control
 
dust
 
at
 
production
 
sections
 
and
 
along
 
conveyor
 
belts,
 
and
 
to
 
cool
 
electric
motors.
 
Water
 
is available
 
from nearby
 
sources and
 
is distributed
 
within the mine
 
by pipelines as
required.
13.4.2
Surface Mines and Highwall Miners
Three surface resource areas were modeled.
 
Mining operations are projected to utilize area
 
mining
as well as contour mining (
CTR
) methods with an emphasis on creating highwall for highwall mining
activity.
 
The projected operations will
 
employ two existing
 
front-end loaders capable
 
of a
 
combined
production rate
 
of approximately
 
8,900 bcm/hr with
 
supplemental assistance
 
of 6 dozers
 
that can
generate an additional 700 bcm/hr providing their spoil placement does not interfere with planned
highwall
 
mining
 
activity.
 
The
 
older,
 
higher-hour
 
front
 
end
 
loader
 
will
 
be replaced
 
in
 
early
 
2023
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
52
with
 
a
 
higher
 
production
 
hydraulic
 
excavator
 
that
 
will
 
increase
 
the
 
capability
 
of
 
the
 
loading
machines to
 
11,300 bcm/hr.
 
The dozers
 
will continue
 
supplementing the loading
 
production on
 
a
periodic basis as described previously.
 
The potential production level of combined machines is not
projected to be achieved until 2024 and not
 
consistently until 2027 due to lack of sufficient working
areas.
 
Sufficient reserves allow mining to continue to the year 2055.
The models assume
 
that the operations
 
will work two,
 
10-hour production shifts,
 
5 days per
 
week
plus every
 
other Saturday,
 
with sufficient
 
staffing
 
to float
 
vacation
 
during the
 
year.
 
A total
 
of 82
employees are assumed for the surface mines at full production.
It
 
is
 
assumed
 
that
 
most
 
of
 
the
 
spoil
 
movement
 
goes
 
through
 
a
 
shovel
 
or
 
loader
 
bucket
 
and
 
is
eventually returned to the pit for final
 
reclamation.
 
The dozer’s primary responsibility is cutting the
initial benches for the drill and shaping the reclaimed contour highwall.
 
All highwall
 
mining is assumed
 
to be performed
 
by a contractor.
 
The contractor
 
is responsible for
staffing those operations along with providing
 
necessary equipment capital.
Spoil for
 
final highwall
 
reclamation is
 
expected to
 
come from
 
strategic
 
placement of
 
spoil on
 
pre-
existing benches by
 
haul trucks
 
such that
 
they are within
 
the push
 
distance of the
 
reclamation dozer.
 
13.4.2.1
Toney
 
Fork
Toney
 
Fork surface mining operations are projected to be mined from 2028 to 2055, with emphasis
placed on preparing space
 
for HWM operations.
 
Expected production for
 
the operations averages
approximately 232,000 marketable
 
tonnes.
The
 
Toney
 
Fork
 
HWM
 
operates
 
from
 
2028
 
to
 
2056
 
and
 
mines
 
an
 
additional
 
172,000
 
marketable
tonnes at steady state levels.
13.4.2.2
Buffalo Creek South
The Buffalo Creek South surface and/or HWM mining operations are projected to operate between
2023 and
 
2055, with
 
emphasis placed
 
on preparing
 
space for
 
HWM operations.
 
Expected surface
production
 
for
 
the
 
operations
 
totals
 
approximately
 
246,000
 
marketable
 
tonnes
 
at
 
steady
 
state
levels.
 
The
 
Buffalo
 
Creek
 
HWM
 
mines
 
an
 
additional
 
212,000
 
marketable
 
tonnes
 
at
 
steady
 
state
levels.
13.4.2.3
Sugar Camp
Sugar
 
Camp
 
surface
 
mining
 
operations
 
are
 
projected
 
to
 
be
 
mined
 
from
 
2028
 
to
 
2055.
 
Expected
production for the operations average
 
approximately 180,000 marketable
 
tonnes.
 
The
 
Sugar
 
Camp
 
HWM
 
operates
 
from
 
2028
 
to
 
2056
 
and
 
mines
 
an
 
additional
 
46,000
 
marketable
tonnes.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
53
As shown in
Tables 13-1 through 13-3
, the areas
 
planned for underground production continue
 
until
2045,
 
whereas
 
surface
 
and
 
auger/HWM
 
production
 
is
 
projected
 
to
 
finish
 
in
 
2056.
 
Clean
 
coal
production varies directly
 
with coal thickness
 
in the
 
case of the
 
underground mines, and
 
overburden
removal for the surface mines.
Table 13-1:
 
Underground Summary of Production by Year (000)
Mine Name
2023
2024
2025
2026
2027
2028
2029
2030
Camp Br Chilton
0
0
0
0
0
0
321
355
Eagle No. 1 (Toney
 
Fork)
561
566
545
571
536
609
613
477
Elk Lick Chilton
0
0
0
0
0
0
202
249
Lower Powellton
0
0
0
0
0
0
0
0
Lower War Eagle
398
472
452
446
444
493
509
482
Powellton No. 1
0
135
359
378
374
438
432
436
Muddy Br No.2 Gas
605
598
618
592
520
714
0
0
Upper Winifrede
0
0
0
0
0
0
0
0
Winifrede (Chilton Rider)
219
0
0
0
0
0
0
0
 
Total
1,783
1,770
1,974
1,988
1,874
2,254
2,077
1,999
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
54
Mine Name
2031
2032
2033
2034
2035
2036
2037
2038
Camp Br Chilton
348
283
300
0
0
0
0
0
Eagle No. 1 (Toney
 
Fork)
468
482
466
470
456
556
407
545
Elk Lick Chilton
262
280
291
299
241
294
336
355
Lower Powellton
0
0
33
245
492
510
499
511
Lower War Eagle
545
561
490
462
468
322
0
0
Powellton No. 1
315
210
204
347
0
0
0
0
Muddy Br No.2 Gas
0
0
0
0
0
0
0
0
Upper Winifrede
0
0
0
0
0
0
493
505
Winifrede (Chilton Rider)
0
0
0
0
0
0
0
0
 
Total
1,938
1,817
1,784
1,823
1,657
1,682
1,736
1,916
Mine Name
2039
2040
2041
2042
2043
2044
2045
2046
Camp Br Chilton
0
0
0
0
0
0
0
0
Eagle No. 1 (Toney
 
Fork)
551
524
478
482
510
506
427
0
Elk Lick Chilton
320
328
351
0
0
0
0
0
Lower Powellton
509
513
495
569
666
52
0
0
Lower War Eagle
0
0
0
0
0
0
0
0
Powellton No. 1
0
0
0
0
0
0
0
0
Muddy Br No.2 Gas
0
0
0
0
0
0
0
0
Upper Winifrede
347
307
142
0
0
0
0
0
Winifrede (Chilton Rider)
0
0
0
0
0
0
0
0
 
Total
1,726
1,672
1,466
1,051
1,177
558
427
0
Table 13-2:
 
Surface Summary of Production by Year (000)
Mine Name
2023
2024
2025
2026
2027
2028
2029
2030
Toney Fork Surf
0
0
0
0
0
234
234
232
Buffalo Cr South Area
298
458
521
509
526
207
207
205
Sugar Camp Area 1
0
0
0
0
0
181
181
180
 
Total
298
458
521
509
526
622
622
618
 
 
 
 
 
 
 
 
 
Mine Name
2031
2032
2033
2034
2035
2036
2037
2038
Toney Fork Surf
231
231
231
231
233
233
231
232
Buffalo Cr South Area
205
204
205
205
206
206
205
205
Sugar Camp Area 1
179
179
179
179
181
181
179
180
 
Total
616
613
616
616
620
620
616
618
 
 
 
 
 
 
 
 
 
Mine Name
2039
2040
2041
2042
2043
2044
2045
2046
Toney Fork Surf
233
234
232
231
229
232
231
233
Buffalo Cr South Area
206
207
205
205
203
205
205
206
Sugar Camp Area 1
181
181
180
179
177
180
179
181
 
Total
620
622
618
616
609
618
616
620
 
 
 
 
 
 
 
 
 
Mine Name
2047
2048
2049
2050
2051
2052
2053
2054
Toney Fork Surf
233
232
232
233
234
233
231
229
Buffalo Cr South Area
206
205
205
206
207
206
205
203
Sugar Camp Area 1
181
180
180
181
181
181
179
177
 
Total
620
618
618
620
622
620
616
609
Mine Name
2055
2056
2057
2058
2059
2060
2061
2062
Toney Fork Surf
66
0
0
0
0
0
0
0
Buffalo Cr South Area
130
0
0
0
0
0
0
0
Sugar Camp Area 1
51
0
0
0
0
0
0
0
 
Total
247
0
0
0
0
0
0
0
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
55
Table 13-3:
 
Highwall Summary of Production by Year (000)
Mine Name
2023
2024
2025
2026
2027
2028
2029
2030
Toney Fork HWM
0
0
0
0
0
173
173
172
Buffalo Cr South HWM
134
215
234
117
124
219
219
217
Sugar Camp HWM
0
0
0
0
0
46
46
46
 
Total
134
215
234
117
124
438
438
435
 
 
 
 
 
 
 
 
 
Mine Name
2031
2032
2033
2034
2035
2036
2037
2038
Toney Fork HWM
171
171
171
171
173
173
171
172
Buffalo Cr South HWM
216
216
216
216
218
218
216
217
Sugar Camp HWM
46
46
46
46
46
46
46
46
 
Total
433
432
433
433
437
437
433
435
 
 
 
 
 
 
 
 
 
Mine Name
2039
2040
2041
2042
2043
2044
2045
2046
Toney Fork HWM
173
173
172
171
169
172
171
173
Buffalo Cr South HWM
218
219
217
216
214
217
216
218
Sugar Camp HWM
46
46
46
46
45
46
46
46
 
Total
437
438
435
433
428
435
433
437
 
 
 
 
 
 
 
 
 
Mine Name
2047
2048
2049
2050
2051
2052
2053
2054
Toney Fork HWM
173
172
172
173
173
173
171
169
Buffalo Cr South HWM
218
217
217
218
219
218
216
214
Sugar Camp HWM
46
46
46
46
46
46
46
45
 
Total
437
435
435
437
438
437
433
428
 
 
 
 
 
 
 
 
 
Mine Name
2055
2056
2057
2058
2059
2060
2061
2062
Toney Fork HWM
170
111
0
0
0
0
0
0
Buffalo Cr South HWM
215
101
0
0
0
0
0
0
Sugar Camp HWM
45
30
0
0
0
0
0
0
 
Total
430
242
0
0
0
0
0
0
14
Processing and Recovery Methods
14.1
Description or Flowsheet
The Logan
 
County Division
 
includes the
 
Saunders Preparation
 
Plant in
 
addition to
 
the mines.
 
The
plant site includes raw coal storage, clean coal storage, a railroad loadout, and refuse disposal area.
 
The
 
plant has
 
a feed
 
rate
 
capacity
 
of 1,088
 
raw
 
tonnes
 
per hour.
 
Primary separation
 
equipment
includes
 
a
 
heavy
 
media
 
vessel,
 
heavy
 
media
 
cyclones,
 
classifying cyclones,
 
spirals,
 
flotation
 
cells,
and
 
column
 
flotation,
 
supported
 
by
 
the
 
requisite
 
screens,
 
centrifuges,
 
vacuum
 
filters,
 
sumps,
pumps,
 
and
 
distribution
 
systems.
 
Coarse
 
and
 
fine
 
refuse
 
are
 
disposed
 
separately
 
in
 
an
 
adjacent
refuse area which incorporates slurry cells.
Processes and
 
equipment are
 
typical of
 
those used in
 
the coal
 
industry and are
 
in use in
 
nearly all
plants in the Central Appalachian Basin.
 
14.2
Requirements for Energy,
 
Water,
 
Material and Personnel
Personnel
 
have
 
historically
 
been
 
sourced
 
from
 
the
 
surrounding
 
communities
 
in
 
Logan,
 
Boone,
Wyoming,
 
and Mingo
 
counties, and
 
have
 
proven
 
to be
 
adequate in
 
numbers
 
to operate
 
past and
 
 
ex963p2i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
56
current mines.
 
As mining is
 
common in
 
the surrounding
 
areas, the
 
workforce
 
is generally
 
familiar
with mining practices and is comprised of a strong talent pool of experienced miners.
Water
 
is sourced
 
locally from
 
Buffalo Creek
 
Public Service
 
District and/or
 
locally from
 
streams via
water
 
withdrawal
 
permits, and
 
electricity
 
is sourced
 
from
 
AEP.
 
The
 
service industry
 
in the
 
areas
surrounding the
 
mine complex
 
has historically provided
 
supplies, equipment
 
repairs and fabrication,
etc.
 
15
Infrastructure
The
 
Coronado-owned
 
Saunders
 
Preparation
 
Plant
 
services the
 
mines.
 
The
 
ROM
 
coal
 
is delivered
from
 
the
 
Lower
 
War
 
Eagle
 
Mine
 
via
 
overland
 
conveyor,
 
all
 
remaining
 
production
 
is
 
or
 
will
 
be
delivered to the plant site by truck.
The CSX rail line serves as the main means of transport from the mine complex/loadout.
As an active operation, the necessary support infrastructure for
 
Logan is in place.
As new areas
 
are developed, the
 
infrastructure requirements will change.
 
These changes have
 
been
considered in the LOM plans and financial model.
Most of the
 
seams lie below
 
drainage; however, several metallurgical coal seams are situated above
drainage.
 
The
 
underground
 
mining
 
resource
 
areas
 
which
 
are
 
located
 
above-drainage
 
require
 
an
access road
 
and mine
 
access development
 
along the
 
outcrop, whereas
 
below-drainage
 
mines are
accessed based on other
 
proposed surface infrastructure locations and/or surface property control.
 
In some cases, the
 
access and face-up
 
may be developed as
 
part of surface
 
mining activities.
 
A mine
transformer
 
and water tank
 
are located
 
at the face-up,
 
along with the mine
 
fan, stacker
 
conveyor,
supply facilities, shop, office, and bath house.
The
 
surface
 
mining
 
mobile
 
equipment
 
spreads
 
advance
 
the
 
contour
 
and
 
area
 
mining
 
pits
 
while
systematically reclaiming the trailing side of pits where coal has
 
been removed.
 
The coal haul roads
are extended and
 
maintained as
 
the pits
 
advance.
 
Support facilities are
 
maintained nearby
 
but away
from the active mining, and include storage areas for blasting
 
agents, fuel and lubricants, and mine
supplies along with maintenance facilities and offices.
The HWM equipment advances along with the contour mining pits.
 
The rate of advance of contour
mining is
 
somewhat constrained by
 
the advancement rate
 
of the
 
HWM.
 
A diesel-powered generator
trails
 
the
 
highwall
 
miner
 
and
 
powers
 
the
 
continuous
 
mining
 
unit.
 
Other
 
support
 
facilities
 
are
provided along with the contour mining support facilities.
 
A map of the existing facilities in
Figure 15-1
 
shows the layout of the required infrastructure.
 
 
ex963p2i0
 
ex963p66i1
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
57
Figure 15-1:
 
Logan Surface Facilities
16
Market Studies
16.1
Market Description
The quality
 
characteristics for
 
the subject
 
coal resources
 
and coal
 
reserves have
 
been reviewed
 
in
detail by MM&A.
 
The drill hole data was utilized to develop average
 
coal quality characteristics for
the
 
mining
 
site.
 
These
 
average
 
coal
 
quality
 
characteristics
 
were
 
then
 
utilized
 
as
 
the
 
basis
 
for
determining the various markets into which the saleable coal will likely
 
be placed.
 
The projected quality specifications for the Logan products
 
are as shown in
Table 16-1
.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
58
Table 16-1:
 
Quality Specifications by Product
 
HVA
HVB
Thermal
(A/R)
Moisture (%)
7.50
8.00
7.50
Ash (%)
7.50
8.00
12.50
Sulfur (%)
0.90
0.95
1.00
Volatile Matter (%)
32.5
37.0
36.0
Btu/lb.
N/A
N/A
12,300
Fluidity (ddpm)
30,000
25,000
N/A
MMR (%)
1.04
0.93
N/A
CSR
62
58
N/A
FSI
8.00
8.00
N/A
Note:
 
All Specs are dry basis except Moisture and Thermal
The mine production serves both the high-volatile metallurgical and thermal markets.
16.2
Price Forecasts
Coronado provided
 
MM&A with
 
price forecasts
 
for its
 
active operations.
 
Customer coal
 
pricing is
derived
 
from
 
market
 
observed
 
forward
 
estimates
 
based
 
on
 
global economic
 
supply
 
and
 
demand
analysis
 
which
 
is
 
applied
 
to
 
mine
 
plan
 
sales
 
volumes
 
and
 
product
 
mix
 
and
 
is
 
supplemented
 
with
Coronado’s in-house knowledge of applicable rail transportation charges, ocean
 
freight charges and
port charges.
 
MM&A utilized this data for price forecasting
 
in financial modeling.
 
Concurrent with
aforementioned-quality
 
parameters
 
in
 
the
 
preceding
 
section,
 
production
 
from
 
the
 
proposed
operations
 
is
 
assumed
 
to
 
be
 
primarily
 
sold
 
in
 
metallurgical
 
markets
 
with
 
limited
 
thermal
 
sales.
 
Pricing was provided through calendar year 2056.
 
Coal price forecasts
 
for the Logan products
 
were provided by
 
Coronado for various
 
coal markets in
terms of US nominal dollars per metric tonne.
 
16.3
Contract Requirements
Some
 
contracts
 
are
 
necessary
 
for
 
successful
 
marketing
 
of
 
the
 
coal.
 
For
 
Logan,
 
since
 
all
 
mining,
preparation and marketing is done in-house, the remaining
 
contracts required are:
>
Transportation
 
– The Mine contracts with the CSX Railroad to transport the coal to either the
domestic customers or to the Pier 9 and Dominion terminals at Norfolk, Virginia
 
for overseas
shipment.
>
Sales
– Sales contracts are a mix of spot and contract sales.
 
With the volatility of the market,
long-term contracts are not typically written.
 
 
ex963p2i0
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
59
17
Environmental Studies, Permitting and Plans,
Negotiations or Agreements with Local Individuals
17.1
Results of Studies
MM&A completed a Limited Phase I Environmental Site Assessment (
ESA
) on the Logan Property in
May 2017
 
on behalf of
 
Coronado.
 
Coronado reports
 
not having
 
conducted such
 
a study
 
since the
MM&A
 
studies.
 
The
 
ESA
 
completed
 
by
 
MM&A
 
included
 
a
 
site
 
inspection,
 
review
 
of
 
historical
records,
 
a
 
database
 
search
 
of
 
State
 
and
 
Federal
 
regulatory
 
records
 
and
 
interviews
 
to
 
identify
potential
 
recognized
 
environmental
 
conditions
 
(
RECs
)
 
that
 
may
 
create
 
environmental
 
liability
 
for
the sites.
 
MM&A concluded that no long-term liabilities existed at the time of these ESAs.
Based on these former ESAs completed by MM&A, it is the QPs’
 
opinion that Logan has a generally
typical coal industry record of compliance with
 
applicable mining, water quality, and environmental
laws.
 
Estimated costs for mine closure, including water
 
quality monitoring during site reclamation,
are included in the financial models.
17.2
Requirements and Plans for Waste
 
Disposal
The original
 
design for
 
the North
 
Fork Refuse
 
Area (
North Fork
) at
 
the Logan
 
Property projected
 
a
crest
 
to
 
elevation
 
686
 
meters.
 
The
 
present
 
elevation
 
of
 
the
 
deck
 
is
 
±685meters.
 
In
 
2018
 
MSHA
approved an expansion plan to raise
 
the cross-valley crest to
 
elevation 802 meters, and from
 
there
converting
 
to
 
a
 
sidehill
 
fill.
 
This
 
will
 
allow
 
for
 
a
 
total
 
volume
 
of
 
50
 
million
 
CM
 
which
 
would
 
be
sufficient
 
capacity for
 
all the
 
refuse generated
 
by the
 
LOM plan
 
that underpins
 
the current
 
Logan
County Division reserves.
 
Further plans for
 
the North Fork
 
site call for conversion of
 
the fill
 
to a total
cross-valley configuration, predicated
 
on completion of surface mining on the ridge between North
Fork and Middle Fork.
 
This has the potential of providing an additional 10 million CM of capacit
y.
17.3
Permit Requirements and Status
All
 
mining
 
operations
 
are
 
subject
 
to
 
federal
 
and
 
state
 
laws
 
and
 
must
 
obtain
 
permits
 
to
 
operate
mines, coal preparation and related facilities,
 
haul roads, and other incidental surface disturbances
necessary for
 
mining to
 
occur.
 
Permits
 
generally
 
require
 
that
 
the
 
permittee
 
post
 
a
 
performance
bond in
 
an amount
 
established by the
 
regulatory program to provide
 
assurance that any
 
disturbance
or liability
 
created during
 
mining operations
 
is properly
 
restored
 
to an
 
approved post-mining
 
land
use and
 
that all
 
regulations and
 
requirements
 
of the
 
permits are
 
fully satisfied
 
before
 
the bond
 
is
returned
 
to
 
the
 
permittee.
 
Significant
 
penalties
 
exist
 
for
 
any
 
permittee
 
who
 
fails
 
to
 
meet
 
the
obligations
 
of
 
the
 
permits
 
including
 
cessation
 
of
 
mining
 
operations,
 
which
 
can
 
lead
 
to
 
potential
forfeiture
 
of the
 
bond.
 
Any company,
 
and its
 
directors,
 
owners and
 
officers, which
 
are subject
 
to
bond forfeiture can be denied future permits under the program.
1
1
 
Monitored under the Applicant Violator System (AVS) by the Federal Office of Surface Mining.
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
60
New permits
 
or permit
 
revisions will occasionally
 
be necessary
 
to facilitate the
 
expansion or
 
addition
of new
 
mining areas
 
on the
 
properties, such
 
as amendments
 
to existing
 
permits and
 
new permits
for mining
 
of reserve
 
areas.
 
Exploration permits
 
also are
 
required.
 
Property under
 
lease includes
provisions
 
for
 
exploration
 
among
 
the
 
terms
 
of
 
the
 
lease.
 
New
 
or
 
modified
 
mining
 
permits
 
are
subject
 
to
 
a
 
public
 
advertisement
 
process
 
and
 
comment
 
period,
 
and
 
the
 
public
 
is
 
provided
 
an
opportunity
 
to
 
raise
 
objections
 
to
 
any
 
proposed
 
mining
 
operation.
 
MM&A
 
is
 
not
 
aware
 
of
 
any
specific
 
prohibition
 
of
 
mining
 
on
 
the
 
subject
 
property
 
and
 
given
 
sufficient
 
time
 
and
 
planning,
Coronado should
 
be able
 
to secure
 
new permits
 
to maintain
 
its planned mining
 
operations within
the context of current regulations.
 
Necessary permits are in
 
place to support current production on
the properties, but future permits are required to maintain and expand
 
production.
 
Portions of the
properties
 
are
 
located
 
near local
 
communities.
 
Regulations
 
prohibit
 
mining activities
 
within 91.4
meters
 
of a
 
residential dwelling,
 
school, church,
 
or similar
 
structure unless
 
written consent
 
is first
obtained
 
from
 
the
 
owner
 
of
 
the
 
structure.
 
Where
 
required,
 
such
 
consents
 
have
 
been
 
obtained
where mining is proposed beyond the regulatory limits.
Coronado
 
has
 
obtained
 
all
 
mining
 
and
 
discharge
 
permits
 
to
 
operate
 
its
 
mines
 
and
 
processing,
loadout
 
or
 
related
 
facilities.
 
MM&A
 
is
 
unaware
 
of
 
any
 
obvious
 
or
 
current
 
Coronado
 
permitting
issues
 
that
 
are
 
expected
 
to
 
prevent
 
the
 
issuance
 
of
 
future
 
permits.
 
Logan,
 
along
 
with
 
all
 
coal
producers,
 
is subject
 
to a
 
level of
 
uncertainty regarding
 
future clean
 
water
 
permits due
 
to
United
States
 
Environmental
 
Protection
 
Agency
(
EPA
)
and
United
 
States
 
Fish
 
and
 
Wildlife
 
(
USFW
)
involvement with state
 
programs.
The Mining permits currently held by Logan are shown in
Table 17-1.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
61
Table 17-1:
 
Logan Mining Permits
Type
Permit ID
Permit Name
$ Bond
Current Status
Issued
Date
Expiration Date
Hectares
NPDES
Other
O001984
 
North Fork Refuse
1
$1,033,200
 
Renewed
4/11/1984
4/11/2024
116.03
WV0095699
Other - Loadout Only
O009283
 
Elk Lick Dock
$33,000
 
Renewed
6/10/1983
6/10/2023
13.31
WV1023071
Other
O009883
 
Saunders Prep Plant
$223,200
 
Renewed
6/24/1983
6/24/2023
36.04
WV0095699
Other - Refuse Disposal
O012383
 
Middle Fork Refuse
1
$364,800
 
Renewed
9/27/1983
9/27/2023
46.13
WV0096156
Other - Loadout Only
O500513
 
Toney Fork Loadout
 
$32,000
 
Renewed
9/11/2014
9/11/2024
12.67
WV1028081
Other - Refuse Disposal
O501108
Elklick Branch Haulroad/Refuse
1
 
$281,600
 
Renewed
11/13/2008
11/13/2023
5.83
WV1029843
Coal Surface Mine
S500417
 
North Fork Winifrede Contour Mine
 
$390,000
 
Not Started
2/13/2018
2/13/2023
50.59
WV1028430
Coal Surface Mine
S500615
 
Toney Fork A-Ridge Surface Mine
 
 
Phase 1 Released
2/24/2016
2/24/2026
15.8
WV1028278
Coal Surface Mine
S500709
 
Toney Fork Surface Mine No. 3
 
$2,625,000
 
Renewed
11/20/2013
11/20/2023
340.83
WV1019902
Coal Surface Mine
S501210
 
Toney Fork West Surface Mine
 
$1,670,000
 
Inactive
2/29/2012
2/28/2022
134.3
WV1024990
Coal Surface Mine
S501410
 
Elklick Surface Mine
 
$2,760,800
 
Inactive
8/16/2013
8/16/2023
327.47
WV1025015
Coal Surface Mine
S503395
 
TONEY FORK SURFACE #2
 
$5,605,000
 
Renewed
5/28/1998
5/28/2023
453.61
WV1016750
Coal Underground
U004485
 
Dingess Br. No. 1
$0
 
Completely Released
6/12/1985
PHII Released
4.05
WV1008340
Coal Underground
U400299
 
Paynter Branch Mine No. 1
 
$81,000
 
Renewed
4/5/2002
4/5/2027
10.01
WV1018728
Coal Underground
U500109
 
Chilton Deep Mine No. 1
 
$30,800
 
Inactive
1/31/2011
1/31/2026
5.53
WV1019821
Coal Underground
U500789
WA #1 Mine
$0
 
Completely Released
 
7/31/1990
PHII Released
0
WV0096385
Coal Underground
U500919
North Fork Winifrede Deep Mine
$12,240
 
New
3/3/2020
3/3/2025
2.21
WV1030990
Coal Underground
U501311
 
Eagle No. 1 Mine
 
$91,080
 
Not Started
5/20/2013
5/20/2023
7.19
WV1025139
Coal Underground
U502008
 
Dingess Br-Chilton Mine No. 2
 
$42,920
 
Phase 1 Released
10/10/2008
PHI Released
11.62
WV1029908
Coal Underground
U505392
 
ALMA NO. 1 MINE
 
$283,480
 
Renewed
3/3/1995
3/3/2025
39.43
WV1013408
Coal Underground
U506686
Camp Branch Deep Mine
$96,200
 
Renewed
1/26/1987
1/26/1997
26.24
WV0093122
Coal Surface Mine
S500615
 
Toney Fork A-Ridge Surface Mine
 
$80,000
 
Phase 1 Released
2/24/2016
2/24/2026
15.8
WV1028278
Coal Underground
U501015
 
CB Chilton #1 Mine
 
$10,600
 
Not Started
12/28/2016
12/28/2026
1.68
WV1028316
Coal Underground
U503496
Muddy Bridge Branch #1
$35,280
 
Renewed
8/4/1997
8/4/2022
5.46
WV1016954
Coal Underground
U503596
Muddy Bridge Branch #2
$65,520
 
Renewed
8/4/1997
8/4/2022
10.35
WV1016954
River Dock
810-8037
Big Sandy Dock
$210,700
 
In-Active
7/10/1986
7/10/2021
2.99
KYG040724
Coal Surface Mine
S500422
Middle Fork Surface Mine
?
Pending
Pending
Pending
81.73
WV1031198
Coal Surface Mine
S500822
Elklick Contour Surface mine
?
Pending
Pending
Pending
182.45
WV1031228
Notes:
 
 
1.
 
Permits containing refuse placement.
 
2.
 
Does not include prospect permits.
 
 
ex963p2i0
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
62
17.4
Local Plans, Negotiations or Agreements
MM&A found no indication of agreements beyond the scope of Federal
 
or State Regulations.
17.5
Mine Closure Plans
Applicable
 
regulations
 
require
 
that
 
mines
 
be
 
properly
 
closed,
 
and
 
reclamation
 
commenced
immediately
 
upon
 
abandonment.
 
In
 
general,
 
site
 
reclamation
 
includes
 
removal
 
of
 
structures,
backfilling, regrading,
 
and revegetation
 
of disturbed
 
areas.
 
For surface
 
mines, the
 
majority of the
expense for
 
backfilling and regrading
 
is completed as part
 
of ongoing mining operations,
 
with only
reclamation
 
of
 
final
 
pits
 
and
 
HWM
 
benches
 
required
 
at
 
end-of-mine
 
life.
 
Sediment
 
control
 
is
required
 
during the
 
establishment
 
of vegetation,
 
and bond
 
release generally
 
requires
 
a minimum
five-year
 
period
 
of
 
site
 
maintenance,
 
water
 
sampling,
 
and
 
sediment
 
control
 
following
 
mine
completion.
 
This requirement
 
is reduced
 
to two
 
years
 
for
 
certain operations
 
involving re
 
-mining.
 
Reclamation
 
of underground
 
mines includes
 
closure and
 
sealing of
 
mine openings
 
such as
 
portals
and shafts in addition to the items listed above.
 
Estimated
 
costs
 
for
 
mine closure,
 
including water
 
quality monitoring
 
during site
 
reclamation,
 
are
included in
 
the financial
 
models.
 
As with
 
all mining
 
companies, an
 
accretion calculation is
 
performed
annually
 
so the
 
necessary Asset
 
Retirement
 
Obligations
 
(
ARO
) can
 
be shown
 
as
 
a Liability
 
on the
Balance Sheet.
17.6
Qualified Person’s Opinion
The Logan complex
 
is an operating
 
facility; all necessary permits
 
for current
 
production have
 
been
obtained.
 
The QPs
 
know
 
of no reason
 
that any
 
permits revisions
 
that may
 
be required
 
cannot be
obtained.
 
Estimated expenditures for site
 
closure and reclamation are included in the financial model for this
site.
18
Capital and Operating Costs
18.1
Capital Cost Estimate
The production sequence selected for
 
a property must consider the proximity
 
of each reserve area
to
 
coal
 
preparation
 
plants,
 
river
 
docks
 
and
 
railroad
 
loading
 
points,
 
along
 
with
 
suitability
 
of
production equipment to coal seam conditions.
 
The in-place infrastructure was evaluated, and any
future needs were planned to a level suitable for a Preliminary Feasibility Study and included in the
Capital Forecast.
Coronado provided MM&A with an inventory of operating equipment available
 
at Logan.
 
MM&A’s
capital schedules
 
assume that
 
major equipment
 
rebuilds occur
 
over the
 
course of
 
each machine’s
remaining
 
assumed
 
operating
 
life.
 
Replacement
 
equipment
 
was
 
scheduled
 
based
 
on
 
MM&A’s
 
 
ex963p2i0 ex963p15i1
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
63
experience and knowledge
 
of mining equipment and
 
industry standards with
 
respect to the
 
useful
life of such equipment.
 
As one mine is depleted, the equipment is moved to its replacement.
A summary of the estimated capital for the Property is provided
 
in
Figure 18-1
 
below.
 
Figure 18-1:
 
CAPEX
18.2
Operating Cost Estimate
Coronado
 
provided
 
historical
 
and
 
a
 
preliminary
 
5-year
 
projection
 
of operating
 
costs
 
for
 
MM&A’s
review.
 
MM&A used the historical and/or budget cost information
 
as a reference and developed a
personnel
 
schedule
 
for
 
the
 
mine.
 
Hourly
 
labor
 
rates
 
and
 
salaries
 
were
 
based
 
upon
 
information
contained in Coronado’s financial summaries.
 
Fringe benefit costs were developed
 
for vacation and
holidays,
 
federal
 
and
 
state
 
unemployment
 
insurance,
 
retirement,
 
workers’
 
compensation
 
and
pneumoconiosis,
 
casualty
 
and
 
life
 
insurance,
 
healthcare
 
and
 
bonuses.
 
A
 
cost
 
factor
 
for
 
mine
supplies was developed that
 
relates expenditures
 
to mine advance rates
 
for roof
 
control costs
 
and
other
 
mine
 
supply
 
costs
 
experienced
 
at
 
underground
 
mines.
 
Other
 
factors
 
were
 
developed
 
for
maintenance and repair costs, rentals, mine power,
 
outside services and other direct mining costs.
 
Other
 
cost
 
factors
 
were
 
developed
 
for
 
coal
 
preparation
 
plant
 
processing,
 
refuse
 
handling,
 
coal
loading, property
 
taxes,
 
and insurance
 
and bonding.
 
Appropriate
 
royalty
 
rates
 
were
 
assigned for
production
 
from
 
leased coal
 
lands
 
and
 
sales taxes
 
were
 
calculated
 
for
 
state
 
severance
 
taxes,
 
the
federal black lung excise tax,
 
and federal and state reclam
 
ation fees.
Mandated Sales Related Costs such as Black Lung Excise are
 
summarized in
Table 18-1
.
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
64
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
65
Table 18-1:
 
Estimated Coal Production Taxes
 
and Sales Costs
Description of Tax
 
or Sales Cost
Basis of Assessment
Cost
Federal Black Lung Excise Tax
 
- Underground
Per Tonne
$1.21
Federal Black Lung Excise Tax
 
- Surface
Per Tonne
$0.61
Federal Black Lung Excise Tax
 
- Highwall Miner
Per Tonne
$0.61
Federal Reclamation Fees – Underground
Per Tonne
$0.13
Federal Reclamation Fees – Surface
Per Tonne
$0.31
Federal Reclamation Fees - Highwall Miner
Per Tonne
$0.31
West Virginia Reclamation Tax
 
- Underground
Per Tonne
$0.308
West Virginia Reclamation Tax
 
- Surface
Per Tonne
$0.308
West Virginia Reclamation Tax
 
- Highwall Miner
Per Tonne
$0.308
West Virginia Severance Tax
Percentage of Revenue
1 to 5%
Royalties – Underground
Percentage of Revenue
5 to 8.5%
Royalties – Surface
Percentage of Revenue
9%
Royalties - Highwall Miner
Percentage of Revenue
9%
Notes: 1. Federal black lung excise tax is paid only on coal sold domestically.
 
MM&A assumed 45%
of total coal sales to be domestic in the economic analysis discussed below.
A summary of the projected Operating Costs is in
Table 18-2
.
Table 18-2:
 
Logan Operating Costs
 
 
YE 12/31
YE 12/31
YE 12/31
YE 12/31
YE 12/31
YE 12/31
YE 12/31
YE 12/31
Remaining
 
Total
2023
2024
2025
2026
2027
2028
2029
2030
LOM Average
ROM Production
Tonnes
140.8
5.3
6.0
7.2
7.1
7.3
7.1
6.8
6.9
3.4
Yield
50.15%
41.78%
40.92%
37.67%
36.89%
34.67%
46.77%
46.43%
44.46%
55.70%
Saleable
Production
Tonnes
70.6
2.2
2.4
2.7
2.6
2.5
3.3
3.1
3.1
1.9
Thermal Tonnes
4.79
0.09
0.14
0.16
0.15
0.16
0.15
0.15
0.15
0.14
Domestic Met
Tonnes
65.84
2.13
2.31
2.57
2.46
2.37
3.16
2.99
2.90
1.73
Export Met
Tonnes
-
-
-
-
-
-
-
-
-
-
 
Total Saleable
Tonnes
70.63
2.22
2.44
2.73
2.61
2.52
3.31
3.14
3.05
1.9
Cash Costs per
Tonne:
Mining Costs
$83.08
$73.59
$71.70
$73.57
$75.45
$80.17
$65.86
$73.71
$77.65
$87.30
Processing and
Transport
$20.11
$20.58
$19.71
$19.53
$20.03
$21.76
$17.49
$17.61
$18.65
$20.49
Sales Related
Costs
$16.97
$14.47
$13.29
$13.39
$12.93
$14.12
$14.54
$15.27
$15.61
$18.20
G&A
$3.21
$3.69
$3.22
$2.97
$3.10
$3.21
$3.21
$3.21
$3.21
$3.21
 
Total Cash Costs
$123.37
$112.33
$107.92
$109.46
$111.51
$119.26
$101.09
$109.79
$115.12
$129.19
* The Financial model includes 0.001 million tonnes of inferred coal production.
 
Inferred coal represents 0.000001% of the total
production, and none of this coal was included in the estimate of reserves.
19
Economic Analysis
19.1
Assumptions, Parameters and Methods
A pre-feasibility LOM plan
 
was prepared by
 
MM&A for the
 
Logan operations.
 
MM&A prepared mine
projections and production timing forecasts
 
based on coal seam characteristics.
 
Production timing
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
66
was carried
 
out from
 
2023 to
 
depletion (exhaustion)
 
of the
 
coal reserve
 
areas, which
 
is projected
for the year 2056.
 
All costs and prices are based on 2022 nominal United States dollars.
The Mine
 
plan, productivity
 
expectations and cost
 
estimates generally reflect
 
historical performance
by
 
Coronado
 
and
 
efforts
 
have
 
been
 
made
 
to
 
adjust
 
plans
 
and
 
costs
 
to
 
reflect
 
future
 
conditions.
 
MM&A is confident
 
that the mine
 
plan and
 
financial model
 
are reasonably representative to provide
an accurate estimation of coal reserves.
Capital
 
schedules were
 
developed by
 
MM&A for
 
mine development,
 
infrastructure,
 
and on-going
capital
 
requirements
 
for
 
the
 
life
 
of the
 
mine.
 
Staffing
 
levels
 
were
 
prepared,
 
and operating
 
costs
estimated
 
by
 
MM&A.
 
MM&A
 
utilized
 
historical
 
cost
 
data
 
provided
 
by
 
Coronado
 
and
 
its
 
own
knowledge and experience to estimate direct and indirect operating
 
costs.
 
The
 
preliminary
 
feasibility
 
financial
 
model,
 
prepared
 
for
 
this
 
TRS,
 
was
 
developed
 
to
 
test
 
the
economic viability of
 
the coal reserve
 
area.
 
The results of
 
this financial model
 
are not intended
 
to
represent
 
a
 
bankable
 
feasibility
 
study,
 
required
 
for
 
financing
 
of
 
any
 
current
 
or
 
future
 
mining
operations,
 
but
 
are
 
intended
 
to
 
prove
 
the
 
economic
 
viability
 
of the
 
estimated
 
coal
 
reserves.
 
All
costs and prices are based on 2022 nominal United States dollars assuming a 2% inflation rate.
On an unlevered basis, the NPV of the project cash flows after taxes was
 
estimated for the purpose
of
 
classifying
 
coal
 
reserves.
 
The
 
project
 
cash
 
flows,
 
excluding
 
debt
 
service,
 
are
 
calculated
 
by
subtracting direct
 
and indirect
 
operating expenses
 
and capital
 
expenditures from
 
revenue.
 
Direct
costs include labor, drilling and
 
blasting, operating supplies,
 
maintenance and repairs,
 
facilities costs
for
 
materials
 
handling,
 
coal
 
preparation,
 
refuse
 
disposal,
 
coal
 
loading,
 
sampling
 
and
 
analysis
services,
 
reclamation
 
and
 
general
 
and
 
administrative
 
costs.
 
Indirect
 
costs
 
include
 
statutory
 
and
legally
 
agreed
 
upon
 
fees
 
related
 
to
 
direct
 
extraction
 
of
 
the
 
mineral.
 
The
 
indirect
 
costs
 
are
 
the
Federal
 
black
 
lung
 
tax,
 
Federal
 
and
 
State
 
reclamation
 
taxes,
 
property
 
taxes,
 
local
 
transportation
prior to delivery at rail or barge loading sites, coal production royalties, sales and use taxes, income
taxes
 
and
 
State
 
severance
 
taxes.
 
Coronado’s
 
historical
 
costs
 
provided
 
a
 
useful
 
reference
 
for
MM&A’s
 
cost estimates.
Sales revenue is based on
 
the metallurgical coal price information provided to MM&A
 
by Coronado.
Projected
 
debt
 
service
 
is
 
excluded
 
from
 
the
 
P&L
 
and
 
cash
 
flow
 
model
 
in
 
order
 
to
 
determine
Enterprise Value.
The financial model expresses coal sales prices, operating costs, and capital expenditures in current
day
 
dollars
 
without
 
adjustment
 
for
 
inflation.
 
Capital
 
expenditures
 
and
 
reclamation
 
costs
 
are
included based
 
on engineering
 
estimates for
 
each mine
 
by year.
 
The Coronado
 
division’s
 
existing
allocations of administrative costs are
 
continued in the future projections.
Coronado will pay royalties for the various current and projected operations.
 
The royalty rates vary
by mining method and location.
 
The royalty rates for Logan are estimated to be 5 to 9%
 
of the sales
revenue.
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
67
The
 
projection
 
model
 
also
 
includes
 
consolidated
 
income
 
tax
 
calculations
 
at
 
the
 
Coronado
 
level,
incorporating statutory
 
depletion calculations, as well
 
as state income
 
taxes, and a
 
federal tax rate
of
 
21%.
 
To
 
the
 
extent
 
the
 
mine
 
generates
 
net
 
operating
 
losses
 
for
 
tax
 
purposes,
 
the
 
losses
 
are
carried over to offset future taxable
 
income.
 
The terms “cash flows” and “project cash flows” used
in this report refer to after tax
 
cash flows.
Consolidated cash flows are driven
 
by annual sales
 
tonnage, which at steady-state level ranges from
a peak of 3.3 million
 
tonnes in 2028 to
 
a low of 1.0 million tonnes
 
in 2054.
 
Projected consolidated
revenue ranges from $151.9 million to $480.3 million
 
at a steady state.
 
Revenue totals $11.4 billion
for the project’s life.
Consolidated cash flow from operations is positive throughout the projected operating period, with
the
 
exception
 
of post
 
-production
 
years,
 
due to
 
end-of-mine
 
reclamation
 
spending.
 
Consolidated
cash flow from operations
 
peaks at $110.1 million in
 
2038 and totals $2.5 billion over
 
the project’s
life.
 
Capital
 
expenditures
 
total
 
$190.2
 
million
 
from
 
2023
 
through
 
2027 and
 
$1.2
 
billion
 
over
 
the
project’s life.
 
Coal price forecasts for coal
 
products were prepared by Coronado
 
for its proposed operations.
 
Such
prices
 
were
 
used
 
for
 
the
 
revenue
 
input
 
into
 
the
 
financial
 
model.
 
Sales
 
variable
 
costs
 
such
 
as
production royalties and severance
 
taxes were based upon the revenue
 
input.
19.2
Results
The
 
pre-feasibility
 
financial
 
model,
 
prepared
 
by
 
MM&A
 
for
 
this
 
TRS,
 
was
 
developed
 
to
 
test
 
the
economic viability of
 
each coal resource
 
area.
 
The results of
 
this financial model
 
are not intended
to represent
 
a bankable feasibility
 
study,
 
as may be
 
required for
 
financing of any
 
current or future
mining operations contemplated but are intended
 
to prove the economic viability of the estimated
coal reserves.
 
Optimization of the LOM plan was outside the scope of the engagement.
Figure 19-1
 
shows the annual variance of cash costs per ton.
 
Table 19-1
 
shows LOM tonnage, P&L,
and EBITDA for Logan.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex963p77i1
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
68
Figure 19-1:
 
Cash Costs per Tonne
As shown
 
above, Logan’s average cash cost
 
ranges between approximately $101
 
and $147
 
per tonne
for most of the operating period.
Table 19-1:
 
Life-of-Mine Tonnage,
 
P&L before Tax,
 
and EBITDA ($000)
 
LOM
LOM
P&L
LOM
EBITDA
 
Tonnes
Pre-Tax P&L
Per Tonne
EBITDA
Per Tonne
Deep Mines
 
 
 
 
 
Camp Br Chilton
1,607
$21,157
$13.16
$51,064
$31.77
Eagle No. 1 (Toney
 
Fork)
11,806
$18,727
$1.59
$220,119
$18.65
Elk Lick Chilton
3,809
$76,902
$20.19
$146,959
$38.58
Lower Powellton
5,095
$112,692
$22.12
$224,168
$44.00
Lower War Eagle
6,544
$102,095
$15.60
$227,269
$34.73
Powellton No. 1
3,629
$52,199
$14.38
$122,643
$33.80
Muddy Br No.2 Gas
3,647
$166,946
$45.77
$212,139
$58.16
Upper Winifrede
1,794
$61,150
$34.09
$95,271
$53.12
Winifrede (Chilton Rider)
219
$9,021
$41.19
$12,795
$58.42
Consolidated Deep Mines
38,150
$620,890
$16.27
$1,312,426
$34.40
Surface Mines
Toney Fork Surf
6,338
$106,288
$16.77
$245,407
$38.72
Buffalo Cr South Area
7,990
$27,941
$3.50
$203,185
$25.43
Sugar Camp Area 1
4,911
$(100,944)
$(20.55)
$48,015
$9.78
Surface Mines Consolidated
19,239
$33,285
$1.73
$496,606
$25.81
HWM Operations
Toney Fork HWM
4,919
$330,409
$67.17
$361,920
$73.57
Buffalo Cr South HWM
7,004
$434,033
$61.97
$474,395
$67.73
Sugar Camp HWM
1,314
$82,843
$63.05
$91,260
$69.45
HWM Consolidated
13,237
$847,285
$64.01
$927,575
$70.07
Grand Total
70,626
$1,501,460
$21.26
$2,736,607
$38.75
* The Financial model includes 0.001 million tonnes of inferred coal production.
 
Inferred coal represents
0.000001% of the total production, and none of this coal was included in the estimate of reserves.
As
 
shown
 
in
Table
 
19-1,
 
the
 
Logan
 
Complex
 
shows
 
positive
 
EBITDA
 
over
 
the
 
LOM.
 
Overall,
Coronado’s
 
consolidated
 
operations
 
show positive
 
LOM
 
P&L and
 
LOM
 
EBITDA of
 
$1.5 billion
 
and
 
 
ex963p78i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
69
$2.7 billion,
 
respectively.
 
A summary
 
of the
 
key
 
financial performance
 
metrics projected
 
through
2030 is provided below in
Table 19-2
.
Table 19-2:
 
Summary of Logan Key Financial Performance Metrics (2023-2030)
 
 
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
YE
12/31
Remaining
 
Total
2023
2024
2025
2026
2027
2028
2029
2030
LOM Average
ROM Production Tonnes
140.8
5.3
6.0
7.2
7.1
7.3
7.1
6.8
6.9
3.4
Yield
50.15%
41.78%
40.92%
37.67%
36.89%
34.67%
46.77%
46.43%
44.46%
55.70%
Saleable Production
Tonnes
70.6
2.2
2.4
2.7
2.6
2.5
3.3
3.1
3.1
1.9
Thermal Tonnes
4.79
0.09
0.14
0.16
0.15
0.16
0.15
0.15
0.15
0.14
Domestic Met Tonnes
65.84
2.13
2.31
2.57
2.46
2.37
3.16
2.99
2.90
1.73
Export Met Tonnes
-
-
-
-
-
-
-
-
-
-
 
Total Saleable Tonnes
70.63
2.22
2.44
2.73
2.61
2.52
3.31
3.14
3.05
1.9
Cash Costs per Tonne:
Mining Costs
$83.08
$73.59
$71.70
$73.57
$75.45
$80.17
$65.86
$73.71
$77.65
$87.30
Processing and Transport
$20.11
$20.58
$19.71
$19.53
$20.03
$21.76
$17.49
$17.61
$18.65
$20.49
Sales Related Costs
$16.97
$14.47
$13.29
$13.39
$12.93
$14.12
$14.54
$15.27
$15.61
$18.20
G&A
$3.21
$3.69
$3.22
$2.97
$3.10
$3.21
$3.21
$3.21
$3.21
$3.21
 
Total Cash Costs
$123.37
$112.33
$107.92
$109.46
$111.51
$119.26
$101.09
$109.79
$115.12
$129.19
EBITDA per Tonne
$38.75
$69.72
$32.66
$24.91
$24.85
$19.38
$40.61
$30.85
$28.39
$41.21
Expansion CapEx ($M)
$-
$-
$-
$-
$-
$-
$-
$-
$-
$-
Maintenance CapEx ($M)
$1,212.8
$64.5
$46.2
$35.1
$24.7
$19.5
$54.7
$76.7
$30.9
$33.1
 
Total CapEx
$1,212.8
$64.5
$46.2
$35.1
$24.7
$19.5
$54.7
$76.7
$30.9
$33.1
* The Financial model includes 0.001 million tonnes of inferred coal production.
 
Inferred coal represents 0.000001% of the total
production, and none of this coal was included in the estimate of reserves.
After Tax
 
Cash Flows
 
were
 
developed in
 
order to
 
calculate
 
the NPV
 
for
 
this Property.
 
The NPV
 
is
estimated to be $366.6 million
 
at a discount rate
 
of 10.0%.
 
A summary of the Logan after
 
-tax cash
flow is shown in
Table 19-3
.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for
 
the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
70
Table 19-3:
 
Project Cash Flow Summary ($000)
*
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
Total
2023
2024
2025
2026
2027
Production & Sales tonnes
70,626
2,215
2,444
2,730
2,614
2,524
Total Revenue
$11,449,478
$403,255
$343,593
$366,750
$356,408
$349,974
EBITDA
$2,736,607
$154,435
$79,831
$67,982
$64,942
$48,930
Net Income
$1,271,269
$93,455
$33,975
$22,180
$21,044
$7,422
Net Cash Provided by Operating Activities
$2,455,780
$98,886
$84,666
$64,481
$60,927
$49,298
Purchases of Property, Plant, and
 
Equipment
$(1,212,814)
$(64,541)
$(46,249)
$(35,126)
$(24,721)
$(19,540)
Net Cash Flow
$1,242,966
$34,345
$38,417
$29,354
$36,206
$29,758
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2028
2029
2030
2031
2032
2033
Production & Sales tonnes
3,315
3,138
3,052
2,987
2,862
2,833
Total Revenue
$469,730
$441,352
$437,982
$436,621
$425,513
$428,277
EBITDA
$134,632
$96,812
$86,647
$88,298
$85,099
$81,695
Net Income
$76,870
$40,290
$35,152
$37,612
$33,266
$22,374
Net Cash Provided by Operating Activities
$102,420
$94,319
$82,136
$80,835
$79,110
$77,163
Purchases of Property, Plant, and
 
Equipment
$(54,676)
$(76,748)
$(30,875)
$(25,919)
$(58,356)
$(77,043)
Net Cash Flow
$47,743
$17,571
$51,261
$54,916
$20,754
$119
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2034
2035
2036
2037
2038
2039
Production & Sales tonnes
2,872
2,714
2,739
2,785
2,969
2,783
Total Revenue
$445,485
$422,500
$431,983
$440,845
$480,253
$458,789
EBITDA
$108,745
$74,857
$97,015
$103,374
$125,905
$107,907
Net Income
$53,277
$22,619
$43,055
$45,843
$62,109
$46,564
Net Cash Provided by Operating Activities
$92,575
$73,923
$84,785
$93,567
$110,105
$102,650
Purchases of Property, Plant, and
 
Equipment
$(60,090)
$(30,525)
$(49,809)
$(65,949)
$(56,676)
$(42,223)
Net Cash Flow
$32,485
$43,398
$34,975
$27,618
$53,429
$60,427
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2040
2041
2042
2043
2044
2045
Production & Sales tonnes
2,733
2,519
2,100
2,214
1,611
1,476
Total Revenue
$459,598
$431,586
$365,532
$393,908
$289,596
$269,978
EBITDA
$104,671
$94,788
$81,444
$105,980
$58,696
$83,754
Net Income
$47,235
$41,064
$39,833
$60,889
$23,010
$51,731
Net Cash Provided by Operating Activities
$96,543
$88,891
$75,724
$90,314
$63,837
$71,484
Purchases of Property, Plant, and
 
Equipment
$(29,343)
$(33,901)
$(27,895)
$(23,194)
$(29,298)
$(22,073)
Net Cash Flow
$67,200
$54,990
$47,828
$67,120
$34,540
$49,411
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2046
2047
2048
2049
2050
2051
Production & Sales tonnes
1,057
1,057
1,053
1,053
1,057
1,061
Total Revenue
$194,175
$198,147
$201,437
$205,554
$210,544
$215,652
EBITDA
$52,251
$53,459
$54,370
$59,571
$58,316
$59,618
Net Income
$28,842
$28,388
$27,184
$31,758
$28,651
$30,020
Net Cash Provided by Operating Activities
$52,854
$48,225
$49,193
$53,061
$49,045
$52,351
Purchases of Property, Plant, and
 
Equipment
$(18,702)
$(21,272)
$(25,945)
$(30,072)
$(22,359)
$(22,221)
Net Cash Flow
$34,152
$26,953
$23,248
$22,990
$26,686
$30,131
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2052
2053
2054
2055
2056
2057
Production & Sales tonnes
1,057
1,049
1,037
677
242
-
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex963p80i1
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
71
Total Revenue
$219,229
$222,017
$223,966
$151,873
$57,377
$-
EBITDA
$71,599
$60,514
$60,792
$48,780
$20,900
$-
Net Income
$45,345
$29,161
$30,508
$22,011
$9,180
$(339)
Net Cash Provided by Operating Activities
$60,653
$56,148
$54,570
$47,692
$20,671
$(3,597)
Purchases of Property, Plant, and
 
Equipment
$(24,540)
$(27,137)
$(12,933)
$(11,318)
$(11,544)
$-
Net Cash Flow
$36,113
$29,011
$41,637
$36,374
$9,127
$(3,597)
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2058
2059
2060
2061
2062
2063
Production & Sales tonnes
-
-
-
-
-
-
Total Revenue
$-
$-
$-
$-
$-
$-
EBITDA
$-
$-
$-
$-
$-
$-
Net Income
$(174)
$(89)
$(46)
$(0)
$(0)
$(0)
Net Cash Provided by Operating Activities
$(1,835)
$(936)
$(954)
$-
$-
$-
Purchases of Property, Plant, and
 
Equipment
$-
$-
$-
$-
$-
$-
Net Cash Flow
$(1,835)
$(936)
$(954)
$-
$-
$-
* The Financial model includes 0.001 million tonnes of inferred coal production.
 
Inferred coal represents 0.000001% of the total
production, and none of this coal was included in the estimate of reserves.
19.3
Sensitivity
Sensitivity
 
of the
 
NPV
 
results
 
to
 
changes
 
in
 
the
 
key
 
drivers
 
is presented
 
in the
 
chart below.
 
The
sensitivity study shows
 
the NPV at
 
the 10.0% discount
 
rate when
 
Base Case sales prices, operating
costs, and capital costs are increased and decreased in increments
 
of 5% within a +/- 15% range.
Figure 19-2:
 
Sensitivity of NPV
As shown, NPV is quite sensitive to changes in sales price and operating cost estimates, and slightly
sensitive to changes in capital cost estimates.
 
 
ex963p2i0
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
72
20
Adjacent Properties
20.1
Information Used
No Proprietary information associated with neighboring properties was
 
used as part of this study.
21
Other Relevant Data and Information
MM&A performed
 
a previous
 
audit of
 
all the
 
Properties in
 
year 2017
 
for
 
Coronado
 
based on
 
SEC
Industry
 
Guide 7
 
standards.
 
In addition,
 
MM&A completed
 
a Limited
 
Phase I
 
Environmental
 
Site
Assessment
 
(
ESA
)
 
on
 
the
 
Property
 
in
 
2017
 
on
 
behalf
 
of
 
Coronado.
 
MM&A
 
has
 
subsequently
conducted Joint Ore Reserve Committee (
JORC
) compliant resource and reserve assessments of the
Logan County
 
assets as of:
 
(1) December 31,
 
2017, (2) December
 
31, 2020, and
 
(3) December 31,
2021.
 
By
 
assignment,
 
the
 
JORC
 
assessment
 
included
 
a
 
preliminary
 
feasibility
 
level
 
study
 
of
 
the
subject coal reserves, encompassing detailed
 
mine planning and cost analysis through
 
depletion of
Logan’s
 
JORC-compliant coal
 
reserves.
 
MM&A utilized these
 
former preliminary
 
feasibility studies
as the basis of an updated study which meets those standards set forth by the SEC.
22
Interpretation and Conclusions
22.1
Conclusion
Sufficient data
 
has been obtained
 
through various
 
exploration and
 
sampling programs
 
and mining
operations
 
to
 
support
 
the
 
geological
 
interpretations
 
of
 
seam
 
structure
 
and
 
thickness
 
for
 
coal
horizons
 
situated
 
on the
 
Property.
 
The data
 
is of
 
sufficient
 
quantity
 
and reliability
 
to
 
reasonably
support the coal resource and coal reserve estimates in this TRS.
The
 
geological
 
data
 
and
 
preliminary
 
feasibility
 
study,
 
which
 
consider
 
mining
 
plans,
 
revenue,
 
and
operating
 
and
 
capital
 
cost
 
estimates
 
are
 
sufficient
 
to
 
support
 
the
 
classification
 
of
 
coal
 
reserves
provided herein.
This geologic evaluation conducted in conjunction with the preliminary feasibility study is sufficient
to
 
conclude
 
that
 
the
 
70.6
 
Mt
 
of
 
marketable
 
coal
 
reserves
 
identified
 
on
 
the
 
Property
 
are
economically
 
mineable
 
under
 
reasonable
 
expectations
 
of
 
market
 
prices
 
for
 
metallurgical
 
coal
products, estimated operation costs,
 
and capital expenditures.
22.2
Risk Factors
Risks have
 
been identified
 
for
 
operational,
 
technical and
 
administrative
 
subjects addressed
 
in the
Pre-Feasibility
 
Study.
 
A risk
 
matrix has
 
been constructed
 
to present
 
the risk
 
levels for
 
all the
 
risk
factors identified and quantified in
 
the risk assessment process.
 
The risk matrix and
 
risk assessment
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
73
process
 
are
 
modelled
 
to
 
that
 
presented
 
in
 
the
 
Australian
 
and
 
New
 
Zealand
 
Standard
 
on
 
Risk
Management (AS/NZS 4360).
 
The
 
purpose
 
of
 
the
 
characterization
 
of
 
the
 
project
 
risk
 
components
 
is
 
to
 
inform
 
the
 
project
stakeholders
 
of
 
key
 
aspects
 
of
 
the
 
Coronado
 
projects
 
that
 
can
 
be
 
impacted
 
by
 
events
 
whose
consequences can affect
 
the success of the venture.
 
The significance of an impacted
 
aspect of the
operation
 
is
 
directly
 
related
 
to
 
both
 
the
 
probability
 
of
 
occurrence
 
and
 
the
 
severity
 
of
 
the
consequences.
 
The initial risk for
 
a risk factor
 
is herein defined
 
as the risk level
 
after the potential
impact
 
of
 
the
 
risk
 
factor
 
is
 
addressed
 
by
 
competent
 
and
 
prudent
 
management
 
utilizing
 
control
measures readily available.
 
Residual risk for a risk factor is herein defined as the risk
 
level following
application
 
of
 
special
 
mitigation
 
measures
 
if
 
management
 
determines
 
that
 
the
 
initial
 
risk
 
level
 
is
unacceptable.
 
Initial risk and residual risk can be quantified numerically,
 
derived by the product of
values assigned to probability and consequence ranging from very low risk to very high risk.
 
The probability and consequence
 
parameters are subjective numerical estimates made
 
by practiced
mine engineers and
 
managers.
 
Both are
 
assigned values
 
from 1 to
 
5 for which
 
the value
 
1 represents
the
 
lowest
 
probability
 
and least
 
consequence,
 
and the
 
value
 
5 represents
 
the highest
 
probability
and greatest consequence.
 
The products which define the Risk Level are classified
 
from very low to
very high.
 
Risk Level Table
 
(R = P x C)
Risk Level (R)
Very Low (1 to 2)
Low (3 to 5)
Moderate (6 to 11)
High (12 to 19)
Very High (20 to 25)
Risk aspects
 
identified and
 
evaluated
 
during this
 
assignment total
 
13.
 
No residual
 
risks are
 
rated
Very High.
 
One (1) residual risk is rated
 
High.
 
Eight (8) of the risk aspects could be associated
 
with
Moderate residual risk.
 
Four (4) of the risk aspects were attributed Low or Very
 
Low residual risks.
 
22.2.1
Governing Assumptions
The listing of the aspects is
 
not presumed to be exhaustive.
 
Instead that listing is
 
presented based
on the experiences of the contributors to the TRS.
 
1.
The probability and consequence ratings are subjectively assigned, and it is assumed that
this subjectivity reasonably reflects the condition of the active and projected mine
operations.
2.
The Control Measures shown in the matrices presented in this chapter
 
are not exhaustive.
 
They represent a condensed collection of activities that the author of the risk assessment
section has observed to be effective in coal mining scenarios.
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
74
3.
Mitigation Measures listed for each
 
risk factor of the operation are not exhaustive.
 
The
measures listed, however,
 
have been observed by the author to be effective.
 
4.
The monetary values used in ranking the consequences are generally-accepted quantities
 
for
the coal mining industry.
22.2.2
Limitations
The risk assessment proposed in
 
this report is subject to
 
the limitations of the information currently
collected, tested, and interpreted
 
at the time of the writing of the report.
22.2.3
Methodology
The
 
numerical
 
quantities
 
(i.e.,
 
risk
 
levels)
 
attributable
 
to
 
either
 
“initial”
 
or
 
“residual”
 
risks
 
are
derived
 
by the
 
product
 
of values
 
assigned to
 
probability
 
and consequence
 
ranging
 
from
 
very low
risk to very high risk.
R = P x C
Where:
R = Risk Level
P = Probability of Occurrence
C = Consequence of Occurrence
The Probability (P) and
 
Consequence (C) parameters recited in the
 
formula are subjective numerical
estimates
 
made
 
by
 
practiced
 
mine
 
engineers
 
and
 
managers.
 
Both
 
P
 
and
 
C
 
are
 
assigned
 
integer
values
 
ranging
 
from
 
1
 
to
 
5
 
for
 
which
 
the
 
value
 
1
 
represents
 
the
 
lowest
 
probability
 
and
 
least
consequence,
 
and the
 
value 5
 
represents
 
the highest
 
probability
 
and greatest
 
consequence.
 
The
products (R = P x C) which define the Risk Level, are
 
thereafter classified from very low to very high.
Risk Level Table
Risk Level (R)
Very Low (1 to 2)
Low (3 to 5)
Moderate (6 to 11)
High (12 to 19)
Very High (20 to 25)
Very
 
high
 
initial
 
risks
 
are
 
considered
 
to
 
be
 
unacceptable
 
and
 
require
 
corrective
 
action
 
well
 
in
advance of project
 
development.
 
In short,
 
measures must be
 
applied to reduce
 
very high initial
 
risks
to a tolerable level.
 
As
 
shown
 
and
 
discussed
 
above,
 
after
 
taking
 
into
 
account
 
the
 
operational,
 
technical,
 
and
administrative actions that have been
 
applied or
 
are available for action
 
when required, the
 
residual
risk can be determined.
 
The residual risk provides
 
a basis for the
 
management team to
 
determine
if the residual risk
 
level is acceptable or tolerable.
 
If the risk level
 
is determined to be unacceptable,
further actions should be considered to reduce the residual risk to acceptable or tolerable
 
levels to
provide justification for continuation
 
of the proposed operation.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
75
22.2.4
Development of the Risk Matrix
Risks have
 
been identified for
 
the technical,
 
operational, and
 
administrative
 
subjects addressed
 
in
the
 
TRS.
 
The
 
risk
 
matrix
 
and
 
risk
 
assessment
 
process
 
are
 
modelled
 
to
 
that
 
presented
 
in
 
the
Australian and New Zealand Standard on Risk Management (AS/NZS 4360).
 
22.2.4.1
Probability Level Table
Table 22-1:
 
Probability Level Table
Category
Probability Level (P)
1
Remote
Not likely to occur except
 
in exceptional circumstances.
<10%
2
Unlikely
Not likely to occur; small in degree.
10 - 30%
3
Possible
Capable of occurring.
30 - 60%
4
Likely
High chance of occurring in most circumstances.
60 - 90%
5
Almost Certain
Event is expected under
 
most circumstances; impossible to
avoid.
>90%
The lowest rated probability of occurrence is assigned the value of 1 and described as remote, with
a
 
likelihood
 
of
 
occurrence
 
of
 
less
 
than
 
2
 
percent.
 
Increasing
 
values
 
are
 
assigned
 
to
 
each
 
higher
probability
 
of occurrence,
 
culminating
 
with the
 
value
 
of 5
 
assigned to
 
incidents considered
 
to
 
be
almost certain to occur.
22.2.4.2
Consequence Level Table
Table 22-2
 
lists the consequence levels.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
76
Table 22-2:
 
Consequence Level Table
Correlation of Events in Key Elements of the Project Program
 
to Event Severity Category
Category
Severity of
the Event
Financial Impact
of the Event
Unplanned
Loss of
Production
(Impact on
Commercial
Operations)
Events Impacting
on the Environment
Events Affecting the Program's
Social and Community
Relations
Resultant Regulatory /
Sovereign Risk
Events Affecting Occupational Health &
Safety
1
Insignificant
< USD $0.5
million
≤ 12 hours
Insignificant loss of
habitat; no
irreversible effects
on water,
 
soil and
the environment.
Occasional nuisance impact on
travel.
-
 
Event recurrence avoided by corrective
action through established procedures
(Engineering, guarding, training).
2
Minor
USD $0.5 million
to $2.0 million
≤ 1 day
No significant
change to species
populations; short-
term reversible
perturbation to
ecosystem function.
Persistent nuisance impact on
travel.
 
Transient adverse media
coverage.
-
 
First aid – lost time.
 
Event recurrence
avoided by corrective action through
established procedures.
3
Moderate
USD $2.0 million
to $10.0 million
≤ 1 week
Appreciable change
to species
population;
medium-term (≤10
years) detriment to
ecosystem function.
Measurable impact on travel
and water/air quality.
 
Significant adverse media
coverage / transient public
outrage.
Uncertainty securing or
retaining essential
approval / license.
Medical Treatment –
permanent
incapacitation.
 
Avoiding event
recurrence requires modification to
established corrective action procedures
.
Change to regulations
(tax; bonds; standards).
4
Major
USD $10.0
million to $50.0
million
1 to 2 weeks
Change to species
population
threatening
viability; long-term
(>10 years)
detriment to
ecosystem function.
Long-term, serious impact on
travel and use of water
resources; degradation of air
quality; sustained and effective
public opposition.
Suspension / long-delay
in securing essential
approval / license.
Fatality.
 
Avoiding event recurrence
requires modification to established
corrective action procedures and staff
retraining.
Change to laws (tax;
bonds; standards).
5
Critical
>USD $50.0
million
>1 month
Species extinction;
irreversible damage
to ecosystem
function.
Loss of social license.
Withdraw / failure to
secure essential
approval / license.
Multiple fatalities.
 
Avoiding event
recurrence requires major overhaul of
policies and procedures.
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
77
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
78
The
 
lowest
 
rated
 
consequence
 
is
 
assigned
 
the
 
value
 
of
 
1
 
and
 
is
 
described
 
as
 
Insignificant
Consequence
 
parameters
 
of
 
which
 
include
 
non-reportable
 
safety
 
incidents
 
with
 
zero
 
days
 
lost
accidents, no environmental damage, loss of production or systems for less
 
than one week and cost
of
 
less
 
than
 
USD
 
$0.5
 
million.
 
Increasing
 
values
 
are
 
assigned
 
to
 
each
 
higher
 
consequence,
culminating with the value of
 
5 assigned to critical consequences, the
 
parameters of which include
multiple-fatality
 
accidents,
 
major
 
environmental
 
damage,
 
and
 
loss
 
of
 
production
 
or
 
systems
 
for
longer than one month and cost of greater than USD $50.0 million.
Composite Risk Matrix R = P x C and Color-Code Convention
The risk level, defined as the
 
product of probability of occurrence and consequence, ranges in
 
value
from
 
1 (lowest
 
possible risk)
 
to
 
25 (maximum
 
risk level).
 
The
 
values
 
are color-coded
 
to facilitate
identification of the highest risk aspects.
Table 22-3:
 
Risk Matrix
P x C = R
Consequence (C)
Insignificant
Minor
Moderate
Major
Critical
1
2
3
4
5
Probability Level (P)
Remote
1
1
2
3
4
5
Unlikely
2
2
4
6
8
10
Possible
3
3
6
9
12
15
Likely
4
4
8
12
16
20
Almost
Certain
5
5
10
15
20
25
22.2.5
Categorization of Risk Levels and Color Code Convention
Very
 
high
 
risks
 
are
 
considered
 
to
 
be
 
unacceptable
 
and
 
require
 
corrective
 
action.
 
Risk
 
reduction
measures must be applied to reduce very high risks to a tolerable level.
22.2.6
Description of the Coal Property
The Logan Mine Complex (
Logan
) is located in Logan, Boone, and Wyoming Counties, West
 
Virginia
–is an
 
active operation
 
with four
 
underground
 
mines and
 
one surface
 
mine.
 
Active underground
operations within the Logan Mine Complex all utilize continuous mining production sections.
 
Large
mining operations are conducted
 
at the
 
Muddy Bridge, Eagle
 
No. 1
 
Mine and Lower
 
War Eagle Mine.
 
Coronado
 
also operates
 
a single
 
section active
 
underground
 
room-and-pillar section
 
in the
 
North
Fork
 
Winifrede
 
Mine.
 
Other
 
operations
 
are
 
projected
 
on
 
relatively
 
small
 
reserve
 
blocks
 
to
 
be
developed
 
sequentially
 
to
 
sustain
 
production
 
levels
 
as
 
each
 
reserve
 
is
 
depleted.
 
The
 
method
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
79
provides continuity,
 
preserving skilled work groups
 
and enabling effective
 
utilization of production
equipment.
 
Mines located
 
above drainage
 
have access
 
via drift
 
entries.
 
A few
 
of the
 
coal seams
are below drainage and are accessed with slopes and shafts or box cuts.
The Logan
 
Mine Complex
 
also includes
 
one active
 
surface mine
 
(Toney
 
Fork) and
 
one idle
 
surface
mine (Elklick).
 
Both area and contour
 
surface mining are employed.
 
Highwall mining is conducted
by contract
 
operators.
 
The
 
surface
 
operations
 
are
 
relatively
 
small and
 
developed
 
sequentially to
sustain production
 
levels.
 
Similar to the
 
underground operations,
 
the method provides
 
continuity
while
 
preserving
 
skilled
 
work
 
groups
 
and
 
enabling
 
effective
 
utilization
 
of
 
production
 
equipment.
 
The surface mining methods selected utilize hydraulic shovels, front-end loaders, large tractors and
rock trucks for overburden removal.
22.2.7
Summary of Residual Risk Ratings
Each
 
risk factor
 
is numbered,
 
and
 
a
 
risk level
 
for
 
each
 
is determined
 
by
 
multiplying
 
the
 
assigned
probability by
 
the assigned
 
consequence.
 
The risk
 
levels are
 
plotted
 
on a
 
risk matrix
 
to provide
 
a
composite
 
view
 
of
 
the
 
Coronado
 
risk
 
profile.
 
The
 
average
 
risk
 
level
 
is
 
7.7,
 
which
 
is
 
defined
 
as
Moderate.
Table 22-4:
 
Risk Assessment Matrix
 
 
 
 
 
 
 
 
 
Consequence
Critical
>$50 MM
8, 9
 
 
 
 
 
Major
$10-50MM
 
 
 
6
 
 
Moderate
$2-10 MM
12
1, 2, 3, 4
 
 
 
Minor
$0.5-$2 MM
 
 
13
5, 10
7
 
Low
<$0.5 MM
 
 
11
 
 
 
 
<10%
10-30%
30-60%
60-90%
>90%
 
Remote
Unlikely
Possible
Likely
Almost
Certain
22.2.8
Risk Factors
A
 
high-level
 
approach
 
is
 
utilized
 
to
 
characterize
 
risk
 
factors
 
that
 
are
 
generally
 
similar
 
across
 
a
number of
 
the active
 
and proposed
 
mining operations.
 
Risk factors
 
that
 
are
 
unique to
 
a specific
operation or are particularly noteworthy are
 
addressed individually.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
80
22.2.8.1
Geological and Coal Resource
Coal
 
mining
 
is
 
accompanied
 
by
 
risk
 
that,
 
despite
 
exploration
 
efforts,
 
mining
 
areas
 
will
 
be
encountered
 
where geological
 
conditions render
 
extraction
 
of the
 
resource to
 
be uneconomic,
 
or
that coal quality characteristics disqualify the product for sale into
 
target markets.
Offsetting the geological and
 
coal resource risk
 
are the massive
 
size of the
 
controlled property which
allows large areas to be mined sufficiently away from
 
areas where coal quality and mineability may
be
 
less
 
favorable.
 
In
 
addition,
 
several
 
mines
 
are
 
designed
 
to
 
operate
 
with
 
multiple
 
production
sections, which lessens
 
the immediate
 
impact when one section
 
encounters difficulties.
 
The large
reserve areas also provide
 
a mitigation strategy
 
of developing an additional (spare) section
 
at each
mine,
 
or
 
additional
 
mines,
 
which
 
can
 
be
 
activated
 
when
 
adverse
 
conditions
 
are
 
encountered,
thereby
 
maintaining
 
consistent
 
production
 
and
 
quality.
 
The
 
spare
 
section
 
or
 
mines
 
require
additional mine extension cost but increase flexibility and performance consistency.
The
 
larger
 
reserve
 
areas
 
will
 
be
 
developed
 
with
 
multiple
 
production
 
sections
 
and
 
the
 
small,
replacement production reserve areas
 
provide ready access
 
to alternative locations if
 
geological and
coal resource characteristics require
 
abandonment of an active production area.
Table 22-5:
 
Geological and Coal Resource Risk Assessment (Risks 1 and 2)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Recoverable coal tonnes
recognized to be
significantly less than
previously estimated.
Reserve base is adequate to
serve market commitments
and respond to opportunities
for many years.
 
Local
adverse conditions may
increase frequency and cost
of production unit relocations.
Previous and ongoing
exploration and extensive
regional mining history
provide a high level of
confidence of coal seam
correlation, continuity of the
coal seams, and coal
resource tonnes.
4
4
16
Optimize mine plan
to increase resource
recovery; develop
mine plan to provide
readily available
alternate mining
locations to sustain
expected production
level.
3
3
9
Coal quality locally
proves to be lower than
initially projected.
If uncontrolled, production and
sale of coal that is out of
specification can result in
rejection of deliveries,
cancellation of coal sales
agreements and damage to
reputation.
Exploration and vast
experience and history in
local coal seams provide
confidence in coal quality;
limited excursions can be
managed with careful
product segregation and
blending.
3
5
15
Develop mine plan
to provide readily
available alternate
mining locations to
sustain expected
production level;
modify coal sales
agreements to
reflect coal quality.
3
3
9
22.2.8.2
Environmental
MM&A
 
completed
 
a
 
Limited
 
Phase
 
I
 
Environmental
 
Site
 
Assessment
 
(
ESA
)
 
on
 
the
 
Logan
 
County
Property in May 2017
 
on behalf of
 
Coronado.
 
MM&A concluded that
 
no long-term liabilities
 
existed
at the time of this ESA.
Water
 
quality and
 
other permit
 
requirements
 
are subject
 
to modification
 
and such
 
changes could
have a
 
material impact on
 
the capability of
 
the operator
 
to meet modified
 
standards or
 
to receive
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
81
new permits and modifications
 
to existing permits.
 
Permit protests
 
may result in delays
 
or denials
to permit applications.
Environmental standards and permit requirements have evolved significantly over the
 
past 50 years
and
 
to-date,
 
mining
 
operators
 
and
 
regulatory
 
bodies
 
have
 
been
 
able
 
to
 
adapt
 
successfully
 
to
evolving environmental requirements.
Table 22-6:
 
Environmental (Risks 3 and 4)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Environmental
performance standards
are modified in the future.
Delays in receiving new
permits and modifications to
existing permits; cost of
testing and treatment of water
and soils
Work with regulatory
agencies to understand
and influence final
standards; implement
testing, treatment and
other actions to comply
with new standards.
3
4
12
Modify mining and
reclamation plans to
improve compliance
with new standards
while reducing cost
of compliance.
3
3
9
New permits and permit
modifications are
increasingly delayed or
denied.
Interruption of production and
delayed implementation of
replacement production from
new mines.
Comply quickly with
testing, treatment and
other actions required;
continue excellent
compliance performance
within existing permits.
3
4
12
Establish and
maintain close and
constructive working
relationships with
regulatory agencies,
local communities
and community
action groups.
3
3
9
22.2.8.3
Regulatory Requirements
Federal
 
and
 
state
 
health
 
and
 
safety
 
regulatory
 
agencies
 
occasionally
 
amend
 
mine
 
laws
 
and
regulations.
 
The impact is
 
industry-wide.
 
Mining operators and regulatory agencies have been
 
able
to adapt successfully to evolving health and safety requirements.
Table 22-7:
 
Regulatory Requirements (Risk 5)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Federal and state mine
safety and health
regulatory agencies
amend mine laws and
regulations.
Cost of training, materials,
supplies and equipment;
modification of mine
examination and production
procedures; modification of
mining plans.
Participate in hearings and
workshops when possible
to facilitate understanding
and implementation; work
cooperatively with agencies
and employees to facilitate
implementation of new laws
and regulations.
4
3
12
Familiarity and
experience with new
laws and regulations
results in reduced
impact to operations
and productivity and
improved supplies
and equipment
options.
4
2
8
22.2.8.4
Market and Transportation
Most of the current and future production is expected to be directed to domestic and international
metallurgical markets.
 
Historically the metallurgical markets
 
have been cyclical and highly volatile.
 
Thermal
 
coal
 
markets
 
are
 
also
 
cyclical
 
and
 
domestic
 
markets
 
have
 
been
 
adversely
 
affected
 
by
competition from natural gas and subsidized
 
renewable energy sources and regulation.
 
 
ex963p2i0
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
82
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
83
Table 22-8:
 
Market and Transportation (Risk 6)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Volatile coal prices drop
precipitously.
Loss of revenue adversely
affects profitability; reduced
cash flow may disrupt capital
expenditures plan.
Cost control measures
implemented; capital
spending deferred.
4
5
20
High-cost operations
closed, and
employees
temporarily
furloughed.
4
4
16
Occasional delay or interruption of rail,
 
river and terminals service may be expected.
 
The operator
can
 
possibly
 
minimize
 
the
 
impact
 
of
 
delays
 
by
 
being
 
a
 
preferred
 
customer
 
by
 
fulfilling
 
shipment
obligations promptly and maintaining close working relation
 
ships.
Table 22-9:
 
Market and Transportation (Risk 7)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Rail or river transport is
delayed; storage and
shipping access at river
and ocean terminals is
not available.
Fulfillment of coal sales
agreements delayed; limited
coal storage at mines may
increase cost of rehandling;
production may be temporarily
idled.
Provide adequate storage
capacity at mines;
coordinate continuously
with railroad and shipping
companies to respond
quickly and effectively to
changing circumstances.
5
3
15
Provide back-up
storage facility along
with personnel,
equipment and
rehandle plan to
sustain production
and fulfill sales
obligations timely.
5
2
10
22.2.8.5
Mining Plan
Occupational health and
 
safety risks are inherent
 
in mining
 
operations.
 
Comprehensive training and
retraining
 
programs,
 
internal
 
safety
 
audits
 
and
 
examinations,
 
regular
 
mine
 
inspections,
 
safety
meetings, along
 
with support
 
of trained
 
fire brigades
 
and mine
 
rescue teams
 
are among
 
activities
that
 
greatly
 
reduce
 
accident
 
risks.
 
Employee
 
health monitoring
 
programs
 
coupled
 
with dust
 
and
noise monitoring and abatement reduce health risks to miners.
 
As
 
underground
 
and
 
surface
 
mines
 
are
 
developed
 
and
 
extended,
 
observation
 
of
 
geological,
hydrogeological and geotechnical conditions leads to modification of mine plans and procedures to
enable safe work within the mine environments.
Highlighted
 
below
 
are
 
selected
 
examples
 
of
 
safety
 
and
 
external
 
factors
 
relevant
 
to
 
Coronado
operations.
22.2.8.5.1
Methane Management
Coalbed methane is
 
present in coal
 
operations below
 
drainage.
 
Often the methane
 
concentration
in shallow coal seams is at such low levels that it can be readily managed with frequent testing
 
and
monitoring,
 
vigilance
 
and
 
routine
 
mine
 
ventilation.
 
Very
 
high
 
methane
 
concentrations
 
may
 
be
present
 
at
 
greater
 
depths.
 
High
 
methane
 
concentrations
 
may
 
require
 
degasification
 
of
 
the
 
coal
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
84
seam to assure safe mining.
 
Due to the seams being targeted and their depths, excessive
 
methane
is not expected to be encountered at Logan.
Table 22-10:
 
Methane Management (Risk 8)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Methane hazard is
present in mines
operating below
drainage.
Injury or loss of life; possible
ignition of gas and mine
explosion; potential loss of
mine and equipment
temporarily or permanently;
additional mine fan, mine
power, ventilation, monitoring
and examination
requirements.
Low to moderate levels can
be managed with frequent
examinations, testing and
monitoring within the mine
ventilation system.
 
Excellent rock dust
maintenance minimizes
explosion propagation risk
should an ignition occur.
1
5
5
Very high-level
methane
concentrations may
require coal seam
degasification and
gob degasification if
longwall or pillar
extraction methods
are employed.
1
5
5
22.2.8.5.2
Mine Fires
Mine
 
fires,
 
once
 
common
 
at
 
mine operations,
 
are
 
rare
 
today.
 
Most
 
active
 
coal
 
miners
 
have
 
not
encountered a mine
 
fire.
 
Vastly improved mine power and
 
equipment electrical systems, along
 
with
safe
 
mine
 
practices
 
reduce
 
mine
 
fire
 
risks.
 
Crew
 
training
 
and
 
fire
 
brigade
 
support
 
and
 
training
improve response for containment and
 
control if a
 
fire occurs.
 
Spontaneous combustion within coal
mines, which is the source of most fires that occur today, is not expected to commonly occur at the
Logan
 
property.
 
When spontaneous
 
combustion
 
conditions
 
are
 
present,
 
monitoring
 
systems
 
are
employed for
 
early detection
 
and mine plans
 
are designed to
 
facilitate
 
isolation, containment
 
and
rapid extinguishment.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
85
Table 22-11:
 
Mine Fires (Risk 9)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Mine fire at underground
or surface mine
operation.
Injury or loss of life; potential
loss of mine temporarily or
permanently; damage to
equipment and mine
infrastructure.
Inspection and
maintenance of mine
power, equipment and
mine infrastructure; good
housekeeping; frequent
examination of conveyor
belt entries; prompt
removal of accumulations
of combustible materials.
1
5
5
If spontaneous
combustion
conditions are
present, enhanced
monitoring and
examination
procedures will be
implemented; mine
design will
incorporate features
to facilitate isolation,
containment and
extinguishment of
 
spontaneous
combustion
locations.
1
5
5
22.2.8.5.3
Highwall Failure
Contour surface mining, area surface mining and highwall mining all expose miners and production
equipment
 
to
 
the
 
risk
 
of
 
highwall
 
failure.
 
The
 
highwall
 
can
 
be
 
designed
 
to
 
incorporate
 
safety
precautions to address geotechnical and hydrogeological concerns.
 
Drilling and blasting design can
be modified to
 
fit soil and
 
strata
 
conditions to
 
enhance highwall stability.
 
Foremen and
 
crews are
trained to examine the highwalls frequently to observe changes and indications of failure.
 
Highwall
designs incorporate adequate web thickness and safety
 
pillar width to assure highwall stability.
Table 22-12:
 
Highwall Failure (Risk 10)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Highwall failure occurs at
surface or highwall
mining operations.
Injury or loss of life;
catastrophic damage to
equipment; production
interruption.
Regular inspection for
change and signs of failure;
conservative design of
HWM web thickness and
safety pillar width;
conservative wall slope and
bench width in design.
4
3
12
Optimize drilling and
blasting plan;
increase safety
factors for wall slope
and bench width;
install
instrumentation and
frequent survey to
detect movement;
dewater to reduce
wall pressure.
4
2
8
22.2.8.5.4
Availability of Supplies and Equipment
The industry
 
has periodically
 
experienced
 
difficulty receiving
 
timely delivery
 
of mine
 
supplies and
equipment.
 
Availability
 
issues
 
often
 
accompanied
 
boom
 
periods
 
for
 
coal
 
demand.
 
Any
 
future
delivery
 
of
 
supplies
 
and
 
equipment
 
delays
 
are
 
expected
 
to
 
be
 
temporary
 
with
 
limited
 
impact
 
on
production.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
86
Table 22-13:
 
Availability of Supplies and Equipment (Risk 11)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Disruption of availability
for supplies and
equipment.
Temporary interruption of
production.
Force majeure provision in
coal sales agreements to
limit liability for delayed or
lost sales.
3
2
6
Work closely with
customers to assure
delayed coal
delivery rather than
cancelled sales;
monitor external
conditions and
increase inventory
of critical supplies;
accelerate delivery
of equipment when
possible.
3
1
3
22.2.8.5.5
Labor
Work
 
stoppage
 
due
 
to
 
labor
 
protests
 
are
 
considered
 
to
 
be
 
unlikely
 
and
 
accompanied
 
by
 
limited
impact
 
should
 
it
 
occur.
 
Excellent
 
employee
 
relations
 
and
 
communications
 
limit
 
the
 
exposure
 
to
outside protesters.
 
Loss of supervisors
 
and skilled
 
employees to retirement is inevitable;
 
the impact
can
 
be
 
lessened
 
with
 
succession
 
planning
 
and
 
training
 
and
 
training
 
and
 
mentorship
 
of
 
new
employees.
Table 22-14:
 
Labor – Work Stoppage (Risk 12)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Work stoppage due to
strikes, slowdowns or
secondary boycott
activity.
Loss of production and coal
sales; damaged customer and
employee relations; reputation
loss.
Maintain excellent
employee relations and
communications; maintain
frequent customer
communications.
2
3
6
Develop plan for
employee
communications and
legal support to
minimize impact of
secondary boycott
activities.
1
3
3
Table 22-15:
 
Labor – Retirement (Risk 13)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation Measures
Residual Risk
Level
P
C
R
P
C
R
Retirement of
supervisors and skilled
employees.
Loss of leadership and
critical skills to sustain
high levels of safety,
maintenance and
productivity.
Monitor demographics
closely and maintain
communications with
employees who are
approaching retirement age;
maintain employee selection
and training programs.
3
3
9
Maintain selection of
candidates and
implementation of in-
house or third-party
training for electricians
and mechanics; develop
employee mentoring
program.
3
2
6
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Coronado Global Resources Inc.
 
Statement of Coal Resources and Reserves for the
 
Logan County Complex in Accordance with
 
the JORC Code and United States SEC Regulation S-K 1300 as of
December 31, 2022
 
Central Appalachian Coal Basin
West Virginia, USA
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
87
23
Recommendations
Coronado is
 
continuing to
 
work both
 
internally and
 
with outside
 
assistance to
 
further define
 
their
Resource Base and to Optimize the LOM Plan.
24
References
Publicly available information from various
 
State and Federal agencies was used where relevant.
25
Reliance on Information Provided by the Registrant
A summary of
 
the information provided by Coronado relied upon
 
by MM&A for the purposes
 
of this
TRS is provided in
Table 25-1
.
Table 25-1:
 
Information from Registrant Relied Upon by MM&A
 
Category
Information Provided by Coronado
Report
Section
Marketing
Long-term price forecast used
 
in financial projections
16.2
 
Legal
Mineral control and surface
 
control rights as shown on maps
3.2, 3.3
Environmental
Permit and bonding information
17.3
ex963p97i0
 
 
APPENDIX
A
MM&A QUALIFICATIONS
ex963p98i0
 
 
ex963p99i0
 
 
APPENDIX
B
MAPS
ex963p100i0
 
 
ex963p101i0
 
 
ex963p102i0
 
 
ex963p103i0
 
 
ex963p104i0
 
 
 
ex963p105i0
 
 
ex963p106i0
 
 
ex963p107i0
 
 
ex963p108i0
 
 
ex963p109i0
 
 
ex963p110i0
 
 
ex963p111i0
 
 
ex963p112i0
 
 
ex963p113i0
 
 
 
ex963p114i0
 
 
ex963p115i0
 
 
 
ex963p116i0
 
 
ex963p117i0
 
 
ex963p118i0
 
 
APPENDIX
C
GLOSSARY OF TERMS
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
 
 
 
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Glossary of Abbreviations and Definitions
Abbreviation
Definition
AIPG
American Institute of Professional Geologists
ARMPS
Analysis of Retreat Mining Pillar Stability
ASTM
ASTM International
AVS
Applicant Violator System
bcm
Bank cubic meters
Btu/lb.
British Thermal Unit per pound
CAT
®
Caterpillar Inc.
C.P.G.
Certified Professional Geologist
Carlson
Carlson Mining – formerly SurvCADD
®
 
– a prevalent software package used for
modeling in the Appalachian region
CFR
Code of Federal Regulations
Coronado
Coronado Global Resources Inc.
CSR
Codes of State Rules
 
CSX
CSX Corporation, a rail-based freight transportation
 
company
CTR
Contour mining
Demonstrated
reserves
Demonstrated reserves are the sum of proven
 
and probable reserves.
DEP
Department of Environmental Protection
EBITDA
Earnings before Interest,
 
Taxes,
 
Depreciation, and Amortization
 
EOM
End-of-mine reclamation
EPA
United States Environmental
 
Protection Agency
 
ESA
Limited Phase I Environmental Site Assessment
EVR
Estimated Visual Recovery
Feasibility Study
“…comprehensive technical and economic study of the selected development
option for a mineral project, which includes detailed assessments of all
applicable modifying factors together with any other relevant
 
operational
factors, and detailed financial analysis that
 
are necessary to demonstrate, at
the time of reporting, that extraction is economically viable.
 
According to the
proposed definition, the results of the study may serve as the basis for a final
decision by a proponent or financial institution to proceed with, or finance,
the development of the project.
 
Thus, a feasibility study is more
comprehensive, with a higher degree of accuracy,
 
and yielding results with a
higher level of confidence, than a pre-feasibility study.”
 
Hitachi
Hitachi Construction Machinery Co., Ltd.
HWM
Highwall mining
In situ
Its natural position; said specific of a rock, soil, or fossil when in the situation
in which was originally formed or deposited
Indicated
Resources
Indicated
 
resources
 
are
 
those
 
lying
 
between
 
0.4-kilometer
 
and
 
1.2-kilometer
radius
 
from
 
such an
 
observation
 
point
 
and reported
 
herein
 
as in-situ
 
mineral
resources.
Inferred Resources
Inferred
 
resources
 
lie
 
more
 
than
 
a
 
1.2-kilometer
 
radius
 
from
 
a
 
valid
 
point
 
of
measurement but less than 4.8
 
kilometers from one, and reported herein as
 
in-
situ mineral resources.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
 
 
 
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
Abbreviation
Definition
JORC Code
Australasian Code for Reporting of Exploration
 
Results, Mineral Resources and
Ore Reserves
lb. SO
2
 
/ mm Btu
Pounds per sulfur dioxide per million British thermal units
LJ Hughes
LJ Hughes & Sons, Inc. - drilling Company
LOM
Life-of-mine
M&R
Maintenance and repair
M.B.A.
Master of Business Administration
Measured
Resources
Measured resources are those lying within 0.4-kilometer radius from
 
a valid
point of measurement and reported herein as in-situ mineral resources.
MINER Act
Mine Improvement and New Emergency Response Act of 2006
 
Mineral Reserve
“…the economically mineable part of a Measured and/or Indicated Mineral
Resource.
 
It includes dilution materials and allowances for losses, which occur
when the material is mined or extracted and is defined by studies at
Preliminary Feasibility or Feasibility level as appropriate that include
Modifying Factors.
 
Such studies demonstrate that, at the time of reporting,
extraction of the mineral reserve is economically viable under reasonable
investment and marketing assumptions”.
 
Mineral Resource
“…a concentration or occurrence of solid material of economic interest
 
or on
the Earth’s crust
 
in such form, grade or quality that there are reasonable
prospects for eventual economic extraction.
 
The location, quantity,
 
grade,
continuity and other geological characteristics and continuity
 
of a Mineral
Resource are known, estimated or interpreted
 
from specific geological
evidence and knowledge, including sampling.”
 
MM&A
Marshall Miller & Associates, Inc.
Modifying Factors
“…considerations used to convert Mineral
 
Resources to Mineral Reserves.
 
These include, but are not restricted to, mining, processing, metallurgical,
infrastructure, economic, marketing,
 
legal, environmental compliance, plans,
negotiations, or agreements with local individuals or groups and
governmental factors.”
MRMR
Mineral Resources to Mineral Reserves
MSHA
United States Department of Labor Mine Safety and Health Administration
MSL
Mean sea level
Mt
Million metric tonnes
NAIP
National Agricultural Imagery Program
NIOSH
National Institute for Occupational Safety
 
and Health
NS
Norfolk Southern Corporation, a rail-based freight transportation
 
company
O&M
Operating and maintenance
 
OSD
Out-of-seam dilution
OSM
U.S. Office of Surface Mining Reclamation and Enforcement
P&L
Profit and loss before tax
 
P.E.
Professional Engineer
Preliminary
Feasibility Study
“…as a comprehensive study of a range of options for the technical and
economic viability of a mineral project that has advanced to a stage
 
where a
qualified person has determined (in the case of underground mining) a
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
 
 
 
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Abbreviation
Definition
preferred mining method, or in the case of surface mining) a pit configuration,
and in all cases has determined an effective method of mineral processing
 
and
an effective plan to sell the product. The study’s
 
financial analysis must have
the level of detail necessary to demonstrate, at the time of reporting, that
extraction is economically viable. In addition, as noted in the proposed
definition of a pre-feasibility study,
 
while a pre-feasibility study is less
comprehensive and results in a lower confidence level than a feasibility
 
study,
a pre-
 
feasibility study is more comprehensive and results
 
in a higher
confidence level than an initial assessment.”
 
Property(ies)
Bituminous coal deposits located in Boone, Logan, and Wyoming Counties,
West Virginia.
 
QP
Qualified Person
Qualified Person
“…a person who is a mineral industry professional with at least
 
five years of
relevant experience in the type of mineralization and type of deposit under
consideration and in the specific type of activity that person is undertaking on
behalf of the registrant.
 
In addition, the proposed definition requires a
qualified person to be an eligible member or licensee in good standing of a
recognized professional
 
organization at the
time the technical report is prepared”.
Rec.
Recovery
RECs
Recognized Environmental
 
Conditions
Resource Database
The Resource Database is established by the collection, validation,
 
recording,
storing and processing of data and forms the foundation
 
necessary for the
estimation of Mineral Resource and Mineral
 
Reserve.
 
A quality assurance and quality control program is essential
 
and must be
established to govern the collection of all data.
 
In reporting, a Mineral
Resource must meet the minimum requirement of “reasonable
 
prospects for
economic extraction”.
 
This will require the concurrent collection and storage
of preliminary economic, mining, metallurgical, environmental,
 
legal and
social data and other information for use in the estimation
 
of MRMR.
 
The Resource Database will include both “primary” (observation and
measurement) and “interpreted” data.
 
It is recommended that data be stored
digitally,
 
using a documented, standard format and a reliable storage
 
medium
that allows for easy and complete
 
retrieval of the data.
ROM
Run-of-mine
RPO
Recognized Professional
 
Organizations
S-K 1300
United States Securities and Exchange Commission Regulation
 
S-K 1300
Modernization of Property Disclosures
SEC
U.S. Securities and Exchange Commission
SMCRA
Surface Mining Control and Reclamation Act of 1977 is the primary federal
 
law
that regulates the environmental
 
effects of coal mining in the United States.
SME
Society for Mining Engineers
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
 
 
 
 
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Abbreviation
Definition
Strip Ratio
Represented by bcm of overburden to recoverable
 
coal tonnes
 
tph
tonnes per hour
 
TRS
Technical
 
Report Summary
USA
United States of America
USFW
United States Fish and Wildlife
USGS
United States Geologic Survey
 
VALMIN Code
Australasian Code for Public Reporting of Technical
 
Assessments and
Valuations of Mineral
 
Assets
Vulcan™
Vulcan™ software is a product of Maptek™, a provider
 
of software for the
global mining industry.
ex963p99i0
 
 
APPENDIX
D
INITIAL ECONOMIC ASSESSMENT FOR RESOURCES EXCLUSIVE
OF RESERVES
ex963p124i0
 
 
ex963p125i0
 
 
ex963p126i0
 
 
ex963p127i0
 
 
APPENDIX
E
JORC TABLE 1
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling techniques
>
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation, such as
downhole gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken
as limiting the broad meaning of sampling.
>
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
>
Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30
g charge for fire assay’). In other cases, more explanation may be required, such
 
as where there is
coarse gold that has inherent sampling problems. Unusual commodities or mineralisation
 
types
(e.g. submarine nodules) may warrant disclosure of detailed information.
>
Most of the coal samples have been obtained from the Properties by subsurface exploration
using core drilling techniques.
 
The protocol for preparing and testing the samples has varied over time
and is not well documented for the older holes drilled on the Properties.
>
Typical USA core drilling sampling technique is for the coal core sample, once recovered from
the core barrel, to be described then wrapped in a sealed plastic sleeve and placed into a covered core
box, which is the length of the sample so that the core can be delivered to a laboratory in relatively
intact condition and with original moisture content.
>
It is reasonable to assume, given the sophistication level of the previous operators, that
these samples were generally collected and processed under industry best-practices.
 
This assumption is
based on MM&A’s familiarity with the operating companies and the companies used to perform the
analysis.
 
>
Some of the drill holes were air rotary bored and no coal core samples were collected.
 
Seam
thickness for rotary-drilled bore holes is verified by calibrated downhole gamma-density logs.
 
>
Coal samples that were deemed by MM&A geologists to be unrepresentative were not used
for statistical analysis of coal quality, as documented in the tabulations. A representative group of drill
hole samples from the Properties were then checked against the original drill laboratory reports to
verify accuracy and correctness.
 
Drilling techniques
>
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if so, by what method, etc.).
>
The Properties have been extensively explored by subsurface drilling efforts carried out by
numerous entities, most of which were completed prior to acquisition by Coronado.
 
The majority of the
drilling was accomplished using vertical continuous (diamond) coring or air rotary methods.
>
Core drilling methods utilize NX-size (5.4 centimeter) or similar-sized core cylinders to
recover core samples, which can be used to delineate geologic characteristics, and for coal quality
testing and geotechnical logging.
 
>
Data for the rotary drilled holes is mainly derived from downhole geophysical logs, which are
used to interpret coal and rock thickness and depth since logging of the drill cuttings is not reliable.
>
Geophysical logging was performed on many of the holes, either by Geological Logging
Systems (a division of MM&A), other geophysical logging contractors, and on those properties acquired
from CONSOL geophysical logging was often performed by CONSOL’s in-house logging services.
Drill sample recovery
>
Method of recording and assessing core and chip sample recoveries and results
assessed.
>
Measures taken to maximise sample recovery and ensure representative nature of the
samples.
>
Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
>
Where available, core recovery thickness of coal samples was reconciled with the thickness
interpreted from geophysical logs.
>
Core recovery of the older coal samples lacking geophysical logs is sometimes not well-
documented: however, when the laboratory results for such holes had anomalous values, the data was
disqualified and not used.
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
Criteria
JORC Code explanation
Commentary
Logging
>
Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
>
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.)
photography.
>
The total length and percentage of the relevant intersections logged.
>
A wide variety of core-logging techniques exist for the properties.
 
For many of the core
holes, the primary data source is a generalized lithology description by the driller, in some cases
supplemented by a more detailed core log completed by a geologist.
 
>
The logging of core thickness and depth is quantitative.
 
With the exception of the coal
seams, logging of rock strata type is more subjective and best considered as qualitative.
Sub-sampling
techniques and sample
preparation
>
If core, whether cut or sawn and whether quarter, half or all core taken.
>
If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled wet
or dry.
>
For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
>
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
>
Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
>
Whether sample sizes are appropriate to the grain size of the material being sampled.
>
Typical US practice in the Appalachian Basin is that core samples for deep mineable core
samples are not sawn or subsampled (since seams are not of great thickness and the entire seam is
mined and co-mingled).
>
Oftentimes, core for surface-mineable coal seams are bench sampled separately by the
various coal and rock layers (plies).
>
MM&A has exercised diligence to use only those analyses that are representative of the coal
quality parameters for the appropriate mining type for each sample.
Quality of assay data
and laboratory tests
>
The nature, quality and appropriateness of the assaying and laboratory procedures
used and whether the technique is considered partial or total.
>
For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters
used in determining the analysis including instrument make and model, reading times, calibrations
factors applied and their derivation, etc.
>
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and
precision have been established.
>
Sample analysis was typically carried out by accredited US laboratories.
 
>
Standard procedure upon receipt of core samples by the testing laboratory is to log the
depth and thickness of the sample, then perform testing as specified by a representative of the
operating company.
 
Each sample is then analyzed in accordance with procedures defined under
ASTM
International (
ASTM
)
 
standards including, but not limited to; washability (ASTM D4371); ash (ASTM
D3174); sulfur (ASTM D4239); Btu/lb. (ASTM D5865); volatile matter (ASTM D3175); Free Swell Index
(
FSI
) (ASTM D720).
>
Geophysical tools are calibrated by the logging company and where possible, validated using
a calibration hole.
Verification of
sampling and assaying
>
The verification of significant intersections by either independent or alternative
company personnel.
>
The use of twinned holes.
>
Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
>
Discuss any adjustment to assay data.
>
All coal intersection data used to generate the geologic model has been cross referenced
with the lithological and geophysical logs by MM&A.
>
Laboratory quality was adjusted from dry basis to reflect the anticipated marketable product
moisture.
>
Coal quality results were verified by spot-check with laboratory analysis sheets by MM&A
before inclusion into the geologic model and use in the resource estimate.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Criteria
JORC Code explanation
Commentary
Location of data points
>
Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource estimation.
>
Specification of the grid system used.
>
Quality and adequacy of topographic control.
>
Due to the long history of exploration by various parties on the Properties, a wide variety of
survey techniques exist for documentation of data point locations.
 
Many of the older exploration drill
holes appear to have been located by ground survey; more recently completed drill holes are often
located by high-resolution Global Positioning System (
GPS
) units.
>
Grid systems used are typically the State Plane Coordinate System pertinent to each
property.
 
>
Topography is based on either the USGS topographic 7.5-minute quadrangle maps or on
recent aerial photogrammetry as necessary (subject to availability).
Data spacing and
distribution
>
Data spacing for reporting of Exploration Results.
>
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
>
Whether sample compositing has been applied.
>
Spacing and distribution of data point information may vary from seam to seam within each
mining area.
 
The areas estimated for coal resource and coal reserve tonnes have been limited so that
the data spacing and distribution is sufficient to establish the degree of geological continuity
appropriate for the estimation and classification of the coal tonnes.
 
>
All of the coal resource tonnes are in the measured, indicated, and inferred categories, and
all of the coal reserve tonnes are in the proved and probable categories in accordance with the JORC
Code and SEC standards.
 
Orientation of data in
relation to geological
structure
>
Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.
>
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this should be assessed
and reported if material.
>
Drill holes have been vertically drilled.
 
No downhole deviation logs have been collected and
it is therefore not known if the drill holes have deviated away from vertical.
 
Based on the relatively
shallow seam depths, any deviation is expected to be insignificant and immaterial to the geologic
characterization of the Property.
>
The dip of the coal seams is relatively minor and not a material issue for representation of
seam thickness or quality.
Sample security
The measures taken to ensure sample security.
>
Sample handling procedures employed by explorationists follow typical US protocol and
should be adequate to insure sample security.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
>
MM&A has reviewed all available geological information for the Properties in developing the
geologic model.
 
Only that data deemed suitable has been used for the purpose of generating the
resource and reserve estimates.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement and
land tenure status
>
Type, reference name/number,
 
location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding royalties, native
title interests, historical sites, wilderness or national park and environmental settings.
>
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
>
The Coronado coal resources are located within three of the United State of America:
Virginia; West Virginia; and Pennsylvania.
 
Control of these Properties is governed by many hundreds of
agreements.
>
MM&A has not carried out separate title verification for the coal properties and has not
verified leases, deeds, surveys or other property control instruments pertinent to the subject resources.
 
>
Coronado has represented to MM&A that it controls the mining rights to the coal deposits as
shown on its property maps, and MM&A has accepted these as being a true and accurate depiction of
the mineral rights controlled by Coronado.
 
The TRS assumes the properties are developed under
responsible and experienced management.
>
There are no known legal or environmental encumbrances that would impede development
of the subject coal reserves.
Exploration done by
other parties
>
Acknowledgment and appraisal of exploration by other parties.
>
The Properties have been extensively explored by subsurface drilling efforts carried out by
numerous entities, most of which were completed prior to acquisition by Coronado.
>
This exploration work was generally performed to prevailing US best practice standards and
deemed adequate for the purposes of this TRS.
 
Geology
>
Deposit type, geological setting and style of mineralisation.
>
The Coronado coal resources are located within the Northern and Central Appalachian Coal
Basins.
>
The coal deposits are Carboniferous in age, being of the Pennsylvanian system.
>
Seam of economic significance typically range between 0.3 meters and 1.8 meters in
thickness, with relatively little structural deformation.
>
Regional structure is typically characterized by gently dipping strata to the northwest at less
than one percent.
Drill hole Information
>
A summary of all information material to the understanding of the exploration results
including
 
a tabulation of the following information for all Material drill holes:
●
easting and northing of the drill hole collar
●
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole
collar
●
dip and azimuth of the hole
●
down hole length and interception depth
●
hole length.
>
If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
>
MM&A reviewed and entered all pertinent data into a digital geologic database for each
Coronado property.
 
The database consists of thousands of data records, which include drill hole and
supplemental coal seam thickness measurements from outcrop and mine exposures.
 
>
All drill holes in the database are provided with a collar elevation and the State Plane
Coordinate System easting and northing coordinate.
>
After MM&A confirmed proper coal seam thickness and correlation, the seam data was
modelled and compiled into coal resource maps.
>
The maps are provided in the TRS; however, a tabulation of the thousands of individual data
records is not practical to include.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
Criteria
JORC Code explanation
Commentary
Data aggregation
methods
>
In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually Material
and should be stated.
>
Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated and some
typical examples of such aggregations should be shown in detail.
>
The assumptions used for any reporting of metal equivalent values should be clearly
stated.
>
Where a coal seam has been bench sampled (typically for surface mining) the individual
analyses for the coal plies are normally weight-averaged to represent the total of recoverable coal.
>
Coal quality summary results have been documented in the TRS.
 
Average coal quality on a
per-seam basis is used to represent the coal resources within a given mining area.
>
Average coal quality for each Coronado complex is provided in Tables 1-1, 1-2 and 1-3 of this
TRS.
 
>
No other data aggregations methods are used.
Relationship between
mineralisation widths
and intercept lengths
>
These relationships are particularly important in the reporting of Exploration Results.
>
If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
>
If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length, true width not known’).
>
Coal thickness values from all coal intersections and down hole geophysical logs are
considered to be vertical thicknesses.
 
Seam dip of approximately 2.0 to 3.0 degrees has little effect on
the vertical thickness of the seam.
Diagrams
>
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate sectional views.
>
Diagrams and maps showing the coal seam intercepts are presented in the TRS.
Balanced reporting
>
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced to avoid
misleading reporting of Exploration Results.
>
All of the available, qualified exploration data has been included within the tabulations,
maps, and diagrams for this TRS.
>
Both coal thickness and quality data are deemed by MM&A to be reasonably sufficient within
the resource areas. Therefore, there is a reasonable level of confidence in the geologic interpretations
required for coal resource determination based on the available data and the techniques applied to the
data.
Other substantive
exploration data
>
Other exploration data, if meaningful and material, should be reported including (but
not limited to): geological observations; geophysical survey results; geochemical survey results;
bulk samples – size and method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential deleterious or contaminating
substances.
>
Informational material available from the U.S. Geological Survey and the respective State
Surveys was used to assist in the Resource estimate.
 
Further work
>
The nature and scale of planned further work (e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
>
Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not commercially
sensitive.
>
Further work is expected to include additional exploration, geotechnical testing, coal quality
analyses, and coal property acquisition.
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
Section 3 Estimation and Reporting of Mineral Resources
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Database
 
integrity
>
Measures taken to ensure that data has not been corrupted by,
 
for example, transcription
or keying errors, between its initial collection and
 
its use for Mineral Resource estimation purposes.
>
Data validation procedures used.
>
MM&A confirmed coal seam thickness and correlations in databases used for coal deposit
modelling.
 
Representative records were spot-checked for data entry validation.
 
>
Geophysical logs were used wherever available to assist in confirming the seam correlation and
to verify proper seam thickness measurements and recovery of coal samples.
Site
visits
>
Comment on
 
any site
 
visits undertaken
 
by the
 
Competent Person and the outcome of
those visits.
>
If no
 
site visits
 
have been
 
undertaken indicate
 
why this
 
is the case.
>
MM&A is very familiar with the Properties and has conducted multiple site visits throughout the
years.
Geological interpretation
>
Confidence in (or conversely,
 
the uncertainty
 
of) the geological interpretation of the
mineral deposit.
>
Nature of the data used and of any assumptions
 
made.
>
The effect,
 
if any,
 
of alternative
 
interpretations on
 
Mineral Resource estimation.
>
The use of geology in guiding
 
and controlling
 
Mineral Resource estimation.
>
The factors affecting continuity both of grade and geology.
>
Due to the relative structural simplicity of the deposits and the reasonable continuity of the
tabular coal beds, the principal geological interpretation necessary to define the geometry of the coal
deposits is the proper modeling of their thickness and elevation.
 
>
Both coal thickness and quality data are deemed by MM&A to be reasonable within the
resource areas.
 
>
Therefore, there is a reasonable level of confidence in the geologic interpretations required for
coal resource determination based on the available data and the techniques applied to the data.
Dimensions
>
The extent and variability of the Mineral Resource expressed as length (along strike or
otherwise), plan width, and depth below surface to the upper and lower limits of the Mineral
Resource.
>
The subject coal resource areas mostly exist in discreet, individual deposits of highly variable
dimensions, shapes and depth below the ground surface.
>
Such factors are best depicted in the maps contained in the TRS.
>
Details of the parameters are cited within the TRS and included in the table of Cut-off
Parameters listed in Section 11.1 of the TRS.
 
Estimation
and
modelling techniques
>
The nature and appropriateness
 
of the estimation technique(s) applied and key
assumptions, including treatment of extreme grade values, domaining, interpolation parameters and
maximum distance of extrapolation from data points. If
 
a computer assisted estimation method was
chosen include a description of computer software and parameters used.
>
The availability of check estimates, previous estimates and/or mine production records
and whether the Mineral Resource estimate
 
takes
 
appropriate account
 
of
 
such data.
>
The assumptions made regarding recovery
 
of by-products.
>
Estimation of deleterious elements or other non-grade variables of economic
 
significance
(e.g. sulphur for acid mine drainage characterisation).
>
In the case of
 
block model interpolation, the
 
block size in relation to
 
the average sample
spacing and the search employed.
>
Any assumptions behind modelling of
 
selective mining units.
>
Any assumptions about correlation
 
between variables.
>
Description of how the
 
geological interpretation was
 
used to control the resource
estimates.
>
Discussion of basis for using or not
 
using grade cutting or capping.
>
The process of validation,
 
the checking process used, the comparison of
 
model data to
drill hole data, and use of reconciliation data if available.
>
Geological data was imported into Carlson Mining
®
 
(formerly SurvCADD
®
) geological modelling
software in the form of Microsoft
®
 
Excel files incorporating, drill hole collars, seam and thickness picks,
bottom seam elevations and raw and washed coal quality. These data files were validated prior to
importing into the software.
>
Once imported, a geologic model was created.
>
The geological model was verified and reviewed.
 
>
Resources were estimated by defining seam thickness at each point of observation and by
defining resource confidence arcs around the points of observation.
>
Points of observation for Measured and Indicated confidence arcs were defined for all drill holes
that intersected the seam.
 
>
As prescribed by the common United States classification system the following distances from
points of observation were used to define the corresponding Resource category arcs:
-
Inferred Resources – greater than 3,960 feet (1.2 kilometers) but less than 15,840 feet (4.8
kilometers)
-
Indicated Resources – 3,960 feet (1.2 kilometers)
-
Measured Resources – 1,320 feet (0.4 kilometers)
>
The use of the standards commonly used in the United States are appropriate and customary
for this resource jurisdiction and deposition type.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
Criteria
JORC Code explanation
Commentary
>
MM&A performed a geostatistical analysis test of the Coronado data sets using the Drill Hole
Spacing Analysis (
DHSA
) method.
>
Based on MM&A’s analysis, it would be possible to extend the measured, indicated and inferred
arcs slightly beyond historically accepted practices due to consistent geological settings. The QP’s have
elected not to extend arc distances, introducing a level of conservatism in the coal classification.
Moisture
>
Whether the tonnages are estimated on a dry basis or with natural moisture, and the
method of determination of the moisture content.
>
Coal resource tonnes are presented on a dry, in-situ basis.
>
Reserve tonnes are presented on a moist basis at anticipated product moisture ranging from 4.0
to 6.0 percent. Moisture content based on historic analyses of shipped coal.
Cut-off Parameters
>
The basis of the adopted cut-off grade(s) or quality parameters applied.
>
The cut-off parameters were tailored for each of the Coronado properties to be in accordance
with mining/ processing capabilities and market conditions prevalent at each operation.
>
Examples include minimum recoverable coal thickness, acceptable ash content and wash
recovery, and manageable overburden to coal ratio for surface mineable coal.
>
Details of the parameters are cited within the TRS and included in the table of Cut-off
Parameters listed in Section 11.1 of this TRS.
>
These cut-off parameters have been developed by MM&A based on its experience with the
Coronado properties and other mining operations of the Central Appalachian coal basin.
 
This experience
includes technical and economic evaluations of numerous properties in the region for the purposes of
determining the economic viability of the subject coal reserves.
Mining factors or
assumptions
>
Assumptions made regarding possible mining methods, minimum mining dimensions and
internal (or, if applicable, external) mining dilution. It is always necessary as part of the process of
determining reasonable prospects for eventual economic extraction to consider potential mining
methods, but the assumptions made regarding mining methods and parameters when estimating
Mineral Resources may not always be rigorous. Where this is the case, this should be reported with
an explanation of the basis of the mining assumptions made.
>
Mining factors such as dilution, mining and washing recovery are variable and have been
applied at the coal deposits at each operation based on site-specific characteristics.
>
Details of the factors are cited within the TRS.
>
Factors that would typically preclude conversion of a coal resource to coal reserve include the
following: inferred resource classification; absence of coal quality; poor mine recovery; lack of access;
insufficient exploration; or uncontrolled surface property for areas of proposed for surface mining.
 
>
While such factors were used to preclude the conversion of a very limited number of coal
resources to coal reserves in this report, the extensive history of mining on the Properties would suggest
that there are reasonable prospects for eventual economic extractions of all coal resources under
favorable market conditions.
Metallurgical factors
 
or
assumptions
>
The basis for assumptions or predictions regarding metallurgical amenability. It is always
necessary as part of the process of determining reasonable prospects for eventual economic
extraction to consider potential metallurgical methods, but the assumptions regarding metallurgical
treatment processes and parameters made when reporting Mineral Resources may not always be
rigorous. Where this is the case, this should be reported with an explanation of the basis of the
metallurgical assumptions made.
>
The products mined from coal resources controlled by Coronado can be sold into high-, mid-,
and low-volatile metallurgical coal markets because of their inherent quality characteristics.
 
>
Run-of-mine production is washed at the coal preparation plants as needed for quality control.
 
>
Coronado may blend production from multiple sources to manage ash and sulfur content along
with the rheological and petrographic characteristics of the shipped products.
 
Environmental factors
 
or
assumptions
>
Assumptions made regarding possible waste and process residue disposal options. It is
always necessary as part of the process of determining reasonable prospects for eventual economic
extraction to consider the potential environmental impacts of the mining and processing operation.
 
While at this stage the determination of potential environmental impacts, particularly for a
greenfields project, may not always be well advanced, the status of early consideration of these
potential environmental impacts should be reported. Where these aspects have not been considered
this should be reported with an explanation of the environmental assumptions made.
>
MM&A completed a Limited Phase I Environmental Site Assessment (ESA) on the Buchanan
property in April 2016, and on the Logan County and Greenbrier Properties in May 2017 on behalf of
Coronado.
 
Coronado reports not having conducted such a study since the MM&A studies.
 
>
The ESAs completed by MM&A included a site inspection, review of historical records, a
database search of State and Federal regulatory records and interviews to identify potential recognized
environmental conditions (RECs) that may create environmental liability for the sites.
 
>
MM&A identified one REC at Greenbrier associated with stained soil and gravel near a fueling
and maintenance area.
 
Coronado reported to MM&A that satisfactory clean-up efforts were completed at
Greenbrier.
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
9
Criteria
JORC Code explanation
Commentary
>
Based on these former ESAs completed by MM&A, it is MM&A’s opinion that Coronado has a
generally typical coal industry record of compliance with applicable mining, water quality, and
environmental laws.
 
Estimated costs for mine closure, including water quality monitoring during site
reclamation, are included in the TRS financial models.
 
Bulk density
>
Whether assumed or determined. If assumed, the basis for the assumptions. If
determined, the method used, whether wet or dry, the frequency of the measurements, the nature,
size and representativeness of the samples.
>
The bulk density for bulk material must have been measured by methods that adequately
account for void spaces (vugs, porosity, etc), moisture and differences between rock and alteration
zones within the deposit.
>
Discuss assumptions for bulk density estimates used in the evaluation process of the
different materials.
>
Laboratory derived seam densities measured in specific gravity were used where available.
 
As
needed, these data were supplemented by estimated seam density values based on the relative proportion
of coal and non-coal material within the seam (typically at 1.30 and 2.25 specific gravity, respectively).
>
Average seam density was determined for each coal deposit and used to convert coal volumes
into coal tonnage estimates.
Classification
>
The basis for the classification of the Mineral Resources into varying confidence
categories.
>
Whether appropriate account has been taken of all relevant factors (i.e. relative
confidence in tonnage/grade estimations, reliability of input data, confidence in continuity of geology
and metal values, quality, quantity and distribution of the data).
>
Whether the result appropriately reflects the Competent
>
Person’s view of the deposit.
>
The Resource has been classified based on suitable distances from points of observations
prescribed in the common United States classification system.
>
The use of the United States standards is appropriate and customary for this resource
jurisdiction and deposition type.
>
MM&A performed a geostatistical analysis test of the Coronado data sets using the Drill Hole
Spacing Analysis (
DHSA
) method.
>
Based on MM&A’s analysis, it would be possible to extend the measured, indicated and inferred
arcs slightly beyond historically accepted practices due to consistent geological settings. The QP’s have
elected not to extend arc distances, introducing a level of conservatism in the coal classification.
>
All relevant factors have been accounted for and reflect the Competent Person’s
 
view of the
deposit.
Audits or reviews
>
The results of any audits or reviews of Mineral Resource estimates.
>
MM&A completed prepared a statement of coal resources and reserves for the Properties in
accordance with the JORC Code as of December 31, 2017.
 
MM&A also subsequently updated the estimate
of resources and reserves for depletion as of December 31, 2018, December 31, 2019, December 31, 2020
and December 31, 2021.
>
MM&A performed a previous audit of the Properties in year 2017 for Coronado based on U.S.
Securities and Exchange Commission (SEC) Industry Guide 7 and USGS Circular 891 standards.
 
>
Earlier audits were performed by various independent consultants for predecessors-in-title to
Coronado and at various levels of detail depending on the clients concerns and the allotted time for
completion.
 
Previous audits and reviews defined the primary coal resource areas and estimated the
recoverable tonnes for each seam based on the expected mining methods.
 
>
Additionally, MM&A has performed proprietary evaluations for predecessors-in-title to
Coronado, which encompass portions of the Properties included in this TRS.
Discussion of relative
accuracy/ confidence
>
Where appropriate a statement of the relative accuracy and confidence level in the
Mineral Resource estimate using an approach or procedure deemed appropriate by the Competent
Person. For example, the application of statistical or geostatistical procedures to quantify the relative
accuracy of the resource within stated confidence limits, or, if such an approach is not deemed
appropriate, a qualitative discussion of the factors that could affect the relative accuracy and
confidence of the estimate.
>
The relative accuracy of and confidence in the coal tonnage and quality estimates provided
herein are judged to be in conformance with current industry best-practices.
 
>
The representation of average coal quality characteristics should be understood to represent a
reasonably representative sampling that is generally indicative of coal quality and does not represent a
statistically rigorous approach to coal quality modeling.
>
Resource estimation has been completed using standard coal estimation methods which are
deemed appropriate for this deposit.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
10
Criteria
JORC Code explanation
Commentary
>
The statement should specify whether it relates to global or local estimates, and, if local,
state the relevant tonnages, which should be relevant to technical and economic evaluation.
Documentation should include assumptions made and the procedures used.
>
These statements of relative accuracy and confidence of the estimate should be
compared with production data, where available.
Section 4 Estimation and Reporting of Ore Reserves
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral Resource
estimate for conversion
to Ore Reserves
 
>
Description of the Mineral Resource estimate used as a basis for the conversion to an Ore
Reserve.
>
The coal resource estimate was prepared as part of the report Coronado Global Resources Inc.
Statement of Coal Resources and Reserves in Accordance with JORC Code and United States SEC
Standards as of December 31, 2022 – Northern and Central Appalachian Coal Basins – Virginia, West
Virginia and Pennsylvania, USA – February 2023 prepared by MM&A.
>
The resource estimation criteria were developed by MM&A based on the capabilities of the mining
equipment used within the production model and on industry-accepted standards to assure that the
basic geologic characteristics of the coal resources are in reasonable conformity with those to be mined
and marketed by Coronado.
>
Clear statement as to whether the Mineral Resources are reported additional to, or inclusive
of, the Ore Reserves.
>
Coal resources generally are reported inclusive of the coal reserves.
 
In some cases, resources are
reported in addition to coal reserves.
 
Tables 1-1 and 11-3 of the TRS clearly identify resources
“inclusive of mine plan” from which coal reserves were estimated along with those resources “exclusive
of mine plan” from which no reserves were estimated.
 
Site visits
 
>
Comment on any site visits undertaken by the Competent Person and the outcome of those
visits.
>
MM&A is very familiar with the Properties and has conducted multiple site visits throughout the
years.
Study status
 
>
The type and level of study undertaken to enable Mineral Resources to be converted to Ore
Reserves.
>
A preliminary feasibility LOM plan was prepared by MM&A for active and proposed mines.
 
>
The Code requires that a study to at least Pre-Feasibility Study level has been undertaken to
convert Mineral Resources to Ore Reserves. Such studies will have been carried out and will have
determined a mine plan that is technically achievable and economically viable, and that material
Modifying Factors have been considered.
>
This geologic evaluation conducted in accordance with JORC and SEC standards and in conjunction
with the preliminary feasibility study is sufficient to conclude that the surface, highwall miner and
underground coal reserves identified on the Properties are economically mineable under reasonable
expectations of market prices for thermal and metallurgical coal products, estimated operation costs,
and capital expenditures.
>
The pre-feasibility financial models, prepared by MM&A for this TRS, was developed to test the
economic viability of each coal resource area.
>
Proved and probable coal reserve were derived from the defined in-situ coal resource considering
relevant processing, economic (including independent estimates of capital, revenue and cost,
marketing, legal, environmental, socioeconomic, and regulatory factors).
Cut-off parameters
 
>
The basis of the adopted cut-off grade(s) or quality parameters applied.
>
The cut-off parameters were tailored for each of the Coronado properties to be in accordance with
mining/ processing capabilities and market conditions prevalent at each operation.
>
Examples include minimum recoverable coal thickness, acceptable ash content and wash recovery,
and manageable overburden to coal ratio for surface mineable coal.
>
Details of the parameters are cited within the TRS and included in the table of Cut-off Parameters
listed in Section 11.1 of this TRS.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
11
Criteria
JORC Code explanation
Commentary
>
These cut-off parameters have been developed by MM&A based on its experience with the
Coronado properties and are typical of mining operations in the Central Appalachian coal basin.
 
This
experience includes technical and economic evaluations of numerous properties in the region for the
purposes of determining the economic viability of the subject coal reserves.
Mining factors or
assumptions
 
>
The method and assumptions used as reported in the Pre-Feasibility or Feasibility Study to
convert the Mineral Resource to an Ore Reserve (i.e. either by application of appropriate factors
by optimisation or by preliminary or detailed design).
>
After validating coal seam data and establishing correlations, the thickness and elevation for seams
of economic interest were used to generate a geologic model.
>
A pre-feasibility LOM plan was prepared by MM&A for active and proposed mines.
 
MM&A
prepared mine projections and production timing forecasts based on coal seam characteristics.
 
Production timing was carried out from 2023 to depletion (exhaustion) of the coal reserve areas.
>
The choice, nature and appropriateness of the selected mining method(s) and other mining
parameters including associated design issues such as pre-strip, access, etc.
>
The room-and-pillar mining method was selected to model the underground mining resources,
utilizing continuous miners for coal extraction, shuttle cars for production section haulage and roof
bolters for roof control, with the exception that the Buchanan Mine also uses longwall shearers,
armored face conveyors, and hydraulic self-advancing roof support.
 
The resource areas located above
drainage are relatively small and often have irregular boundaries.
The Buchanan Mine in Buchanan
County, Virginia is the only active longwall mine currently being operated by Coronado.
>
The Coronado underground mining resource areas which are located above-drainage require an
access road and mine access development along the outcrop, whereas below-drainage mines are
accessed via shaft or slope based on other proposed surface infrastructure locations and/or surface
property control.
 
>
The surface mining method selected utilizes highly productive hydraulic shovels, front-end loaders,
large tractors and rock trucks for overburden removal.
 
The mobile equipment spreads adapt readily to
winding coal outcrops for contour surface mining and are effective for point-removal
 
and area mining
applications.
>
Application of highwall and auger mining units is an effective method to recover coal resources not
suitable for underground mining and under excessive cover for surface mining.
>
The assumptions made regarding geotechnical parameters (e.g. pit slopes, stope sizes, etc.),
grade control and pre-production drilling.
>
Mining plans for potential underground mines were developed by MM&A.
 
Pillar stability was
tested by MM&A using the
Analysis of Coal Pillar Stability (ACPS
) program that was developed by the
National Institute for Occupational Safety and Health (
NIOSH
)
.
 
>
Coronado must obtain approved mining plans from
United States Department of Labor Mine
Safety and Health Administration (
MSHA
)
that define safety parameters for the highwalls developed
during contour and area mining.
 
MM&A’s planning model does not require input of specific highwall
design parameters, but provides for timing of mining within mine plan polygons that is representative
of the operation performance attained at Central Appalachia surface mines.
>
Highwall and auger mining is conducted under highwalls designed and constructed to meet MSHA
permit requirements.
 
To better assure highwall stability and safety
 
during highwall coal extraction,
MSHA requires that coal fenders, or stumps, be left in place between successive cuts. Periodic barrier
pillars must be left in place as an additional safeguard.
 
MM&A has adjusted the expected mining
recovery for highwall and auger mining resources to reflect highwall stability and safety requirements.
>
The major assumptions made and Mineral Resource model used for pit and stope
optimisation (if appropriate).
>
Underground Mining Resources:
 
For metallurgical resources, minimum coal seam thickness
extends down to between 0.6 and 1.2 meters and a minimum overburden (depth of cover) of 30.5
meters.
 
A 61-meter horizontal distance is maintained from abandoned mines and sealed or pillared
areas, and a 30-meter horizontal distance is maintained from planned highwall miner panels.
 
Mine
recovery is reduced when a rider coal seam is present within a 1.5- to 3.0-meter interval above the coal
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
12
Criteria
JORC Code explanation
Commentary
seam.
 
No mining is projected when the interval between overlying and underlying reserves is less than
12 meters.
>
Surface Mining Resources:
 
For classification as a surface-mineable resource, a seam must be at
least 0.3 meters in thickness as a stand-alone (principle) seam and 0.15 meters in thickness when less
than 0.8 meters from a principal seam.
 
The maximum cumulative area mining strip ratio is generally
20:1 for thermal coal and 30:1 for metallurgical coal.
 
Some areas were assessed for their economic
viability at higher ratios, and were included as reserves if deemed economic.
 
For contour surface
mining, a minimum of 38-meter bench is provided to support HWM.
>
HWM and Auger Mining Resources: HWM cut depth (penetration) is established at a maximum of
244 meters.
 
The minimum mineable coal thickness is limited at 0.6 meters. For coal seams less than
0.8 meters thick, roof and/or floor characteristics must allow OSD cutting to maintain a 0.8-meter
minimum cutting height.
Auger mining cut depth is established at an average of 91 meters.
 
The
minimum mineable coal thickness is limited at 0.5 meters.
>
The mining dilution factors used.
>
Underground Mining Reserves:
 
The planning model assigns minimum mining heights of 1.4 to 1.8
meters for mains and panel development.
 
At the Buchanan Mine, a minimum mining height of 1.8
meters was used due to the longwall mining method being employed.
 
For coal seams thinner than the
assigned mining height, the difference between the coal seam height and assigned mining height
consists of OSD.
 
In all cases a minimum of 0.05 meters of OSD was assumed, with the exception of the
Mon Valley mines, where a minimum 0.15 meters of OSD was assumed due to weaker floor strata.
>
Surface Mining Reserves:
 
Area mining is generally limited to a cumulative overburden ratio of 30:1
and a 15:1 ratio for contour mining.
 
Exceptions were considered for mining of metallurgical grade coal
where deemed economical.
 
It is assumed that careful cleaning of exposed coal pits will result in
minimal OSD.
>
HWM and Auger Mining Reserves:
 
The mining plan assumes that the HWM cutting height is a
minimum of 76 to 99 centimeters for clearance purposes.
 
When the coal seam is less than 76 to 99
centimeters thick, OSD assumed and included in the ROM product.
Because the auger has very limited
OSD cutting ability, it is assumed that an appropriate auger diameter will be chosen based on the coal
seam thickness and that OSD will be minimal.
>
The mining recovery factors used.
>
Underground Mining Reserves:
 
Mine recovery generally varies between 40 and 60 percent for
continuous mining panels, and 100 percent for longwall.
>
Surface Mining Reserves:
 
Mining recovery is 90 percent for virgin areas.
 
Mining recovery is
reduced where second mining is projected in previously underground and auger mined areas.
>
HWM and Auger Mining Reserves:
 
A mine recovery of 40 percent has been applied for HWM.
A
mine recovery of 35 percent has been applied for auger mining.
>
Any minimum mining widths used.
>
Underground Mining Reserves:
 
Typical entry width is 5.8 to 6.1 meters.
>
The manner in which Inferred Mineral Resources are utilised in mining studies and the
sensitivity of the outcome to their inclusion.
>
Proved and probable coal reserve were derived from the defined in-situ coal resource considering
relevant processing, economic (including independent estimates of capital, revenue and cost,
marketing, legal, environmental, socioeconomic, and regulatory factors).
>
Mine plan LOM tonnage includes inferred coal and those areas that do not meet the minimum coal
thickness requirement for classification as reserve.
 
Inferred coal represents approximately 0.6% of the
LOM production for Mon Valley and 0.000001% of the total LOM production for Logan.
 
None of this
coal was included in the estimate of reserves.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
13
Criteria
JORC Code explanation
Commentary
>
The infrastructure requirements of the selected mining methods.
>
Underground Mining Resources:
 
The continuous mining method provides for the extraction of
coal from the production faces using continuous miners (and longwall shearing machine at Buchanan)
and haulage using shuttle cars or battery haulers to a feeder-breaker located at the tail of the section
conveyor belt.
 
The feeder-breaker crushes large pieces of coal and rock and regulates coal feed onto
the mine conveyor.
 
A chain conveyor is used to remove coal from the longwall face at the Buchanan
Mine for placement onto the conveyor belt which is ultimately delivered to an underground storage
bunker.
 
Roof-bolting machines are used to install roof bolts, and battery scoops are available to clean
the mine entries and assist in delivery of mine supplies to work areas.
 
Surface ventilation fans are
installed as needed to provide a sufficient volume of air to ventilate production sections, coal haulage
and transport entries, battery charging stations, and transformers in accordance with approved plans.
>
Coronado currently operates three coal preparation plants, one each at the Buchanan, Logan
County and Greenbrier Divisions.
 
The Buchanan Plant operates at a feed rate of approximately 907 raw
tonnes per hour (
tph
), whereas the Saunders Plant (Logan County Division) has a nominal feed rate of
816 tph, and the Mountaineer Plant (Greenbrier Division) operates at 544 tph.
MM&A has included
capital estimates for construction of additional coal preparation plants at the Russell County and Mon
Valley Complex for the purposes of this TRS.
 
>
Surface Mining Resources: The surface mining mobile equipment spreads advance the contour and
area mining pits while systematically reclaiming the trailing side of pits where coal has been removed.
 
The coal haul roads are extended and maintained as the pits advance.
 
Support facilities are maintained
nearby but away from the active mining, and include storage areas for blasting agents, fuel and
lubricants, and mine supplies along with maintenance facilities and offices.
 
Most of the surface mine
production is transported to a loading point for crushing, blending and direct-shipment to customers.
 
>
HWM and Auger Resources: The HWM equipment advances along with the contour mining pits.
 
The rate of advance of the contour mining is governed by the advancement rate of the HWM.
 
A diesel-
powered generator trails the highwall miner and powers the continuous mining unit.
 
Other support
facilities are provided along with the contour mining support facilities.
 
HWM production is all
transported by truck to the coal preparation plant for washing.
Metallurgical factors or
assumptions
 
>
The metallurgical process proposed and the appropriateness of that process to the style of
mineralisation.
>
Coarse material is washed in a heavy medium vessel.
 
Intermediate-size material is washed in
heavy medium cyclones.
 
Fine material is washed using conventional froth flotation cells.
>
Whether the metallurgical process is well-tested technology or novel in nature.
>
Processes are typical of those used in the coal industry and are in use at adjacent coal processing
plants.
>
The nature, amount and representativeness of metallurgical test work undertaken, the
nature of the metallurgical domaining applied and the corresponding metallurgical recovery
factors applied.
>
The quality characteristics for the subject coal resources and coal reserves have been reviewed in
detail by MM&A.
 
The drill hole data were utilized to develop average coal quality characteristics
mining site.
 
These average coal quality characteristics were then utilized as the basis for determining
the various markets into which the saleable coal will likely be placed.
>
Any assumptions or allowances made for deleterious elements.
>
No significant effects on product quality are anticipated from dilution material; float product
quality was used to model final product quality.
>
The existence of any bulk sample or pilot scale test work and the degree to which such
samples are considered representative of the orebody as a whole
>
No bulk sample or pilot scale work has been completed.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
14
Criteria
JORC Code explanation
Commentary
>
For minerals that are defined by a specification, has the ore reserve estimation been based
on the appropriate mineralogy to meet specifications?
>
Notwithstanding the complexity of the coal quality data set, the seams of the central and northern
Appalachian coalfields have a long history of providing both high-Btu thermal coals and high-, mid- and
low-volatile coking coals with favorable metallurgical properties.
Environmental
 
>
The status of studies of potential environmental impacts of the mining and processing
operation. Details of waste rock characterisation and the consideration of potential sites, status
of design options considered and, where applicable, the status of approvals for process residue
storage and waste dumps should be reported.
>
MM&A completed a Limited Phase I Environmental Site Assessment (
ESA
) on the Buchanan
property in April 2016, and on the Logan County and Greenbrier Properties in May 2017 on behalf of
Coronado.
>
MM&A identified one REC at Greenbrier associated with stained soil and gravel near a fueling and
maintenance area.
 
Coronado reported to MM&A that satisfactory clean-up efforts were completed at
Greenbrier.
>
Based on these former ESAs completed by MM&A, it is MM&A’s opinion that Coronado has a
generally typical coal industry record of compliance with applicable mining, water quality, and
environmental laws.
 
Estimated costs for mine closure, including water quality monitoring during site
reclamation, are included in the TRS financial models.
Infrastructure
 
>
The existence of appropriate infrastructure:
 
availability of land for plant development,
power,
 
water,
 
transportation (particularly for bulk
 
commodities), labour,
 
accommodation; or the
ease with which the infrastructure can be provided or accessed.
>
Coronado currently operates one surface mine (Toney Fork Mine at the Logan Mine Complex);
Coronado also controls the idle Midland Surface Mine at the Greenbrier Mine Complex.
 
>
Coronado operates five underground mines as follows:
 
Buchanan Mine at the Buchanan Mine
Complex; Winifrede, Eagle No. 1, Muddy Bridge and Lower War Eagle Mines in the Logan Mine
Complex; the Mountaineer #1 Mine at the Greenbrier Mine Complex is currently idle.
>
All ROM production is currently planned for either truck transportation from the mines to the
processing or shipping facilities, or in some cases there is either a current or planned mine mouth
preparation plant and barge/rail loading facility.
 
>
There is a network of public highways that provide serviceable coal haul routes and private,
internal roads on the Properties would be developed as may be needed.
 
Rail service to the Properties
is most readily provided by NS and CSX
with connections to both domestic consumers and international
trans-shipment points.
 
NS track is located across the Monongahela River from the proposed Pangburn
Hollow load-out facility.
 
Coal would be shipped to customers via barge and rail and sold as both
metallurgical and thermal products.
 
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
15
Criteria
JORC Code explanation
Commentary
Costs
 
>
The derivation of, or assumptions made, regarding projected capital costs in the study.
>
The methodology used to estimate operating costs.
>
Coronado provided historical and 5-year budget operating costs for its active mines for MM&A’s
review.
 
MM&A used the historical and/or budget cost information as a reference and developed
personnel schedules for each mine.
 
Hourly labor rates and salaries were based upon information
contained in Coronado’s financial summaries.
 
Fringe benefit costs were developed for vacation and
holidays, federal and state unemployment insurance, retirement, workers’ compensation and
pneumoconiosis, casualty and life insurance, healthcare and bonuses.
 
A cost factor for mine supplies
was developed that relates expenditures to mine advance rates for roof control costs and other mine
supply costs at underground mines.
 
Other factors were developed for maintenance and repair costs,
rentals, mine power, outside services and other direct mining costs.
>
Surface mine direct operating costs were developed as a function of overburden ratio for repair
and maintenance supplies, diesel fuel, explosives and blasting, and miscellaneous supplies and
 
services.
 
Operating costs for highwall mines are based on costs per ROM tonne estimates.
 
Other cost factors
were developed for coal preparation plant processing, refuse handling, coal loading, trucking, property
taxes, and insurance and bonding.
 
Appropriate royalty rates were assigned for production from leased
coal lands and sales taxes were calculated for state severance taxes,
 
the federal black lung excise tax,
and federal and state reclamation fees.
>
Capital schedules were developed by MM&A for mine development, infrastructure, and on-going
capital requirements for the life of each projected mine.
>
Staffing levels were prepared and operating costs estimated by MM&A for each projected mine.
 
MM&A utilized historical cost data provided by Coronado and its own knowledge and experience to
estimate direct and indirect operating costs.
 
>
Allowances made for the content of deleterious elements.
>
No allowances have been made for deleterious elements; no impact to quality from deleterious
elements is anticipated.
>
The derivation of assumptions made of metal or commodity price(s), for the principal
minerals and co- products.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis which
is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s in-house
knowledge of applicable rail transportation charges, ocean freight charges and port charges.
 
Coal price
forecasts for the various products were provided by Coronado for various coal markets in terms of US
nominal dollars per metric tonne.
 
MM&A utilized this data for price forecasting in financial modeling.
>
Derivation of transportation charges.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis which
is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s in-house
knowledge of applicable rail transportation charges, ocean freight charges and port charges.
 
Coal price
forecasts for the various products were provided by Coronado for various coal markets in terms of US
nominal dollars per metric tonne.
 
MM&A utilized this data for price forecasting in financial modeling.
>
The basis for forecasting or source of treatment and refining charges, penalties for failure to
meet specification, etc.
>
MM&A utilized historical cost data provided by Coronado and its own knowledge and experience
to estimate direct and indirect operating costs.
 
All ROM production is currently planned for either
truck transportation from the mines to the processing or shipping facilities, or in some cases there is
either a current or planned mine mouth preparation plant and barge/rail loading facility.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
16
Criteria
JORC Code explanation
Commentary
>
The allowances made for royalties payable, both Government and private.
>
Appropriate royalty rates were assigned for production from leased coal lands and sales taxes were
calculated for state severance taxes, the federal
 
black lung excise tax, and federal and state
reclamation fees.
Revenue factors
 
>
The derivation of, or assumptions made regarding revenue factors including head grade,
metal or commodity price(s) exchange rates, transportation and treatment charges, penalties,
net smelter returns, etc.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis which
is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s in-house
knowledge of applicable rail transportation charges, ocean freight charges and port charges.
 
Coal price
forecasts for the various products were provided by Coronado for various coal markets in terms of US
nominal dollars per metric tonne.
 
MM&A utilized this data for price forecasting in financial modeling.
>
The derivation of assumptions made of metal or commodity price(s), for the principal metals,
minerals and co-products.
>
Coal sales prices as defined above.
 
All reported reserves are on a marketable basis.
Market assessment
 
>
The demand, supply and stock situation for the particular commodity, consumption trends
and factors likely to affect supply and demand into the future.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis which
is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s in-house
knowledge of applicable rail transportation charges, ocean freight charges and port charges.
 
Coal price
forecasts for the various products were provided by Coronado for various coal markets in terms of US
nominal dollars per metric tonne.
 
MM&A utilized this data for price forecasting in financial modeling.
>
A customer and competitor analysis along with the identification of likely market windows
for the product.
>
All of the mine production serves metallurgical and thermal markets.
 
The metallurgical coal is
marketed as high-volatile (typically 28 percent or greater volatile matter content); mid-volatile
(typically 23- to 27-percent volatile matter content) and low-volatile (typically less than 23 percent
volatile matter content) products.
>
Raw ROM production that requires washing is currently processed through Coronado owned and
operated coal preparation plants.
 
>
ROM coal that does not require further processing is delivered directly to the loading points for
sizing and delivery to customers.
 
Coronado has access to two rail-loading points serviced by the
Norfolk Southern Corporation (
NS
)
 
and two rail-loading points serviced by
CSX Corporation (
CSX
)
.
>
Price and volume forecasts and the basis for these forecasts.
>
Carlson Mining
®
 
was used by MM&A to generate mine plans for underground-
 
and surface-
mineable coal seams.
 
Underground mine plans were sequenced based on productivity schedules
provided by Coronado, which were based on historically achieved productivity levels.
 
Surface mine
plans were generated under productivity assumptions (bank cubic yard per shift) as provided by
Coronado and reviewed by MM&A, again based heavily on productivity levels achieved by Coronado.
 
All production forecasting ties assumed production rates to geological models as constructed
independently by MM&A’s team of geologists and mining engineers.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis which
is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s in-house
knowledge of applicable rail transportation charges, ocean freight charges and port charges.
 
Coal price
forecasts for the various products were provided by Coronado for various coal markets in terms of US
nominal dollars per metric tonne.
 
MM&A utilized this data for price forecasting in financial modeling.
Economic
 
>
The inputs to the economic analysis to produce the net present value (NPV) in the study, the
source and confidence of these economic inputs including estimated inflation, discount rate, etc.
>
On an unlevered basis, the NPV of the project cash flows after taxes was estimated for the purpose
of classifying coal reserves.
 
The project cash flows, excluding debt service, are calculated by
subtracting direct and indirect operating expenses and capital expenditures from revenue.
 
Direct costs
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
17
Criteria
JORC Code explanation
Commentary
include labor, drilling and blasting, operating supplies, maintenance and repairs, facilities costs for
materials handling, coal preparation, refuse disposal, coal loading, sampling and analysis services,
reclamation and general and administrative costs.
 
Indirect costs include statutory and legally agreed
upon fees related to direct extraction of the mineral.
 
The indirect costs are the Federal black lung tax,
Federal and State reclamation taxes, property taxes, local transportation prior to delivery at rail
 
or
barge loading sites, coal production royalties, sales and use taxes, income taxes and State severance
taxes. Coronado’s historical costs provided a useful reference
 
for MM&A’s cost estimates.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis which
is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s in-house
knowledge of applicable rail transportation charges, ocean freight charges and port charges.
 
Coal price
forecasts for the various products were provided by Coronado for various coal markets in terms of US
nominal dollars per metric tonne.
 
MM&A utilized this data for price forecasting in financial modeling.
>
All costs and prices are based on 2022 nominal United States dollars.
>
A pre-feasibility LOM plan was prepared by MM&A for active and proposed mines.
 
MM&A
prepared mine projections and production timing forecasts based on coal seam characteristics.
 
Production timing was carried out from 2023 to depletion (exhaustion) of the coal reserve areas, which
is projected for the year 2100.
>
The all-mines average cash cost ranges between approximately $65 and $317 per tonne for most
of the operating period.
>
NPV ranges and sensitivity to variations in the significant assumptions and inputs.
>
An estimate of NPV at a base discount rate of 10.0% was included in Section 19 of the TRS.
>
NPV of the Buchanan, Russell, Mon Valley, Logan and Greenbrier Properties was estimated to be
$1.562 billion, $92.2 million, $168.3 million, $366.6 million
 
and $62.7 million, respectively.
>
The sensitivity study shows the NPV at the 10.0% discount rate when Base Case sales prices,
operating costs, and capital costs are increased and decreased in increments of 5% within a +/- 15%
range.
 
Social
 
>
The status of agreements with key stakeholders and matters leading to social license to
operate.
>
Portions of the properties are located near local communities.
 
Regulations prohibit mining
activities within 91 meters of a residential dwelling, school, church, or similar structure unless written
consent is first obtained from the owner of the structure.
 
Where required, such consents have been
obtained where mining is proposed beyond the regulatory limits.
Other
 
To the extent relevant, the impact of the following on the project and/or on the estimation and
classification of the Ore Reserves:
>
Any identified material naturally occurring risks.
>
No material naturally occurring risks have been identified.
>
The status of material legal agreements and marketing arrangements.
>
The Coronado coal resources are located in Buchanan, Russell and Tazewell Counties, Virginia;
Greenbrier, Logan, Boone, Wyoming and Greenbrier Counties, West Virginia; Allegheny,
 
Washington
and Westmoreland Counties, Pennsylvania.
>
MM&A has not carried out separate title verification for the coal properties and has not verified
leases, deeds, surveys or other property control instruments pertinent to the subject resources.
>
Coronado has represented to MM&A that it controls the mining rights to the reserves as shown on
its property maps, and MM&A has accepted these as being a true and accurate depiction of the mineral
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
18
Criteria
JORC Code explanation
Commentary
rights controlled by Coronado.
 
The TRS assumes the properties are developed under responsible and
experienced management.
>
The status of government agreements and approvals critical to the viability of the project,
such as mineral tenement status and government and statutory approvals. There must be
reasonable grounds to expect that all necessary Government approvals will be received within
the timeframes anticipated in the Pre-Feasibility or Feasibility study. Highlight and discuss the
materiality of any unresolved matter that is dependent on a third part on which extraction of the
reserve is contingent.
>
Coronado has obtained all mining and discharge permits to operate 34 underground mines, 13
surface mines, and 18 processing, loadout or related facilities.
 
MM&A is unaware of any obvious or
current Coronado permitting issues that are expected to prevent the issuance of future permits.
 
Coronado, along with all Central and Northern Appalachian basin coal producers, is subject to a level of
uncertainty regarding future clean water permits due to
United States Environmental Protection
Agency
(
EPA
)
 
involvement with state programs.
Classification
 
>
The basis for the classification of the Ore Reserves into varying confidence categories.
Whether the result appropriately reflects the Competent Person’s view of the deposit. The
proportion of Probable Ore Reserves that have been derived from Measured Mineral Resources
(if any).
>
Measured and indicated resources have been converted to proved and probable reserves,
respectively.
>
None of the probable coal reserves have been derived from measured resources.
>
In a limited number of cases where there was only very limited data available to demonstrate the
metallurgical suitability of a given coal deposit, that deposit was classified as a probable reserve instead
of a proved reserve.
>
The results of this TRS define an estimated total initial ROM recoverable ore (coal) reserve
estimate of 551 million tonnes for Coronado as follows:
a)
 
Buchanan =
 
154 Mt
b)
 
Logan
 
=
 
138 Mt
c)
 
Greenbrier=
 
12 Mt
d)
 
Russell =
 
50 Mt
e)
 
Mon Valley =
 
197 Mt
 
>
Coronado controls a total of 334 Mt (moist basis) of marketable coal reserves for Coronado as of
December 31, 2022 (total may not add due to rounding).
 
Of that total, 74 percent are proved, and 26
percent are probable.
 
Total reserves by complex are as follows:
a)
 
Buchanan =
 
93 Mt
b)
 
Logan
 
=
 
71 Mt
c)
 
Greenbrier=
 
7 Mt
d)
 
Russell =
 
30 Mt
e)
 
Mon Valley =
 
134 Mt
 
Audits or reviews
>
The results of any audits or reviews of Ore Reserve estimates.
>
MM&A completed prepared a statement of coal resources and reserves for the Properties in
accordance with the JORC Code as of December 31, 2017.
 
MM&A also subsequently updated the
estimate of resources and reserves for depletion as of December 31, 2018, December 31, 2019,
December 31, 2020 and December 31, 2021.
>
MM&A performed a previous audit of the Properties in year 2017 for Coronado based on
U.S.
Securities and Exchange Commission (
SEC
)
 
Industry Guide 7 standards.
 
Earlier audits were performed
by various independent consultants for predecessors-in-title to Coronado and at various levels of detail
depending on the clients concerns and the allotted time for completion.
 
Previous audits and reviews
defined the primary coal resource areas and estimated the recoverable tonnes for each seam based on
the expected mining methods.
>
Additionally, MM&A has performed proprietary evaluations for predecessors-in-title to Coronado,
which encompass portions of the Properties included in this TRS.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
19
Criteria
JORC Code explanation
Commentary
Discussion of relative
accuracy/ confidence
 
>
Where appropriate a statement of the relative accuracy and confidence level in the Ore
Reserve estimate using an approach or procedure deemed appropriate by the Competent Person.
For example, the application of statistical or geostatistical procedures to quantify the relative
accuracy of the reserve within stated confidence limits, or, if such an approach is not deemed
appropriate, a qualitative discussion of the factors which could affect the relative accuracy and
confidence of the estimate.
>
Operations on the Properties by Coronado and its predecessors have been on-going for many
years.
 
>
MM&A is confident that the mine plans and financial models are reasonably representative to
provide an accurate estimation of coal reserves.
>
Mine development and operation have not been optimized within the TRS.
>
The statement should specify whether it relates to global or local estimates, and, if local,
state the relevant tonnages, which should be relevant to technical and economic evaluation.
Documentation should include assumptions made and the procedures used.
>
Proved and probable coal reserve were derived from the defined in-situ coal resource considering
relevant processing, economic (including independent estimates of capital, revenue and cost),
marketing, legal, environmental, socioeconomic, and regulatory factors on a global scale as current
local data reflects the global assumptions.
>
Accuracy and confidence discussions should extend to specific discussions of any applied
Modifying Factors that may have a material impact on Ore Reserve viability, or for which there
are remaining areas of uncertainty at the current study stage.
The major risk factors for the active Coronado mines and future resource development are summarized
below:
>
Mine Accidents
>
Highwall Failure.
 
Highwall failures are likely to result in a temporary mine closure and should not
have a material impact on the mine sustainability.
 
The risk is considered to be probable.
 
>
Adverse Geological Conditions.
 
Adverse geological conditions include such conditions as faults and
sandstone washouts.
 
The risk is considered to be probable.
 
The impact is expected to be temporary
with little material impact on mine sustainability.
>
Environmental Risk.
 
Numerous federal and state permits are required to operate coal mines and
mine surface facilities. Permitting rules are complex and may change over time, making compliance
difficult or impossible.
>
Water Quality.
 
Permit requirements to fulfill Clean Water Act obligations are subject to
modification.
 
The probability of water quality changes having a material impact on mine operations is
possible.
 
As a contemporary example, the selenium discharge issue that affects western Canadian and
Central Appalachian Basin operators has only recently emerged as a concern and its ultimate impact
has not been determined.
>
New Permits.
 
Permit protests by environmental groups and individuals can contribute to permit
delays or denial and increase the cost of permitting and delay development.
 
Surface mining activities,
coal refuse disposal and construction of access roads in mountainous terrain often require storage of
material in valley fills.
 
Authority to dispose of fill material into waters of the United States must be
granted by the
United States Army Corps of Engineers (
COE
)
.
 
COE permits are increasingly difficult to
obtain.
>
Regulatory Requirements.
 
Adverse impact from regulatory changes is considered to be probable.
 
The impact will likely affect the broader industry and is not expected to result in mine closure.
>
Market Risk.
 
Metallurgical and thermal coal markets ultimately depend upon the global steel and
thermal coal demand and are considered to be volatile.
 
Currently, the US coal market has seen a
decline in demand for thermal coal due to thermal plant closures, as a result of new air and water
pollution regulations, and competition from other commodities used for power generation such as
natural gas.
 
This has resulted in an overall decline in CAPP coal production.
 
Continued regulatory
changes and declining demand could result in material changes in domestic and global coal markets.
 
The impact cannot be predicted at this time; however, while MM&A expects the coal reserve within
this TRS to remain economically viable throughout the life of the projected mines, the LOM financial
model is very sensitive to changes in coal sales price and therefore market risk is not insignificant.
 
 
ex963p2i0
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix E:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
20
Criteria
JORC Code explanation
Commentary
>
Labor Risk.
 
Work stoppage due to organized labor protests is considered to be unlikely and not
likely to lead to permanent mine closure.
 
The mines are likely to suffer the loss of key supervisors and
skilled employees due to retirement as the workforce ages.
 
The problem is industry-wide and the
impact is expected to be temporary and have no sustained impact on coal production.
>
Availability of Equipment and Supplies.
 
Risk of equipment and supply availability is likely to be
temporary and should not have a sustained adverse impact on the production of coal.
>
Transportation Delay.
 
Interruption of coal transport services by river or rail is considered to be
probable but unlikely to have a sustained impact on coal production.
>
It is recognised that this may not be possible or appropriate in all circumstances. These
statements of relative accuracy and confidence of the estimate should be compared with
production data, where available.
>
Mine plans, productivity expectations and cost estimates generally reflect historical performance
and efforts have been made to adjust plans and costs to reflect future conditions.
ex964p1i0
Coronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
Northern Appalachian Coal Basin
Pennsylvania, USA
February 2023
Prepared for:
Coronado Global Resources Inc.
 
100 Bill Baker Way
 
Beckley, West
 
Virginia 25801
Prepared by:
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
582 Industrial Park Road
Bluefield, Virginia
 
24605
www.mma1.com
ex964p2i0
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
Statement of Use and Preparation
This Technical
 
Report Summary (
TRS
) was prepared by
Marshall Miller & Associates, Inc. (
MM&A
)
for
 
the
 
sole
 
use
 
of
Coronado
 
Global
 
Resources
 
Inc.
 
(
Coronado
)
and
 
its
 
affiliated
 
and
 
subsidiary
companies and advisors.
 
Copies or
 
references to information in this
 
report may not
 
be used
 
without
the written permission of Coronado.
This report provides a
 
statement of coal resources and
 
coal reserves for Coronado, as
 
defined under
the
Australasian Code
 
for Reporting
 
of Exploration Results,
 
Mineral Resources
 
and Ore Reserves
(
JORC Code
) as well as under Subpart 1300 of Regulation S-K (Regulation S-K 1300) promulgated by
the
United States
 
Securities and
 
Exchange Commission
 
(
SEC
)
.
 
Subject to
 
the comments
 
below,
 
this
report
 
was
 
also
 
prepared
 
in
 
accordance
 
with
 
the
Australasian
 
Code
 
for
 
Public
 
Reporting
 
of
Technical
 
Assessments and Valuations of Mineral Assets
(
VALMIN Code
).
 
The statement
 
is based
 
on information
 
provided
 
by Coronado
 
and reviewed
 
by
Qualified Persons
(
QPs
) who are full-time employees of MM&A.
As noted above, this report is a “Public Report” for the purposes of the VALMIN Code.
 
However,
 
in
accordance with paragraph 12.1 of the VALMIN Code, it is noted that this report is not a “Valuation
of
 
Mineral
 
Assets”,
 
and
 
it
 
also
 
does
 
not
 
comply
 
with
 
the
 
following
 
requirements
 
that
 
apply
 
to
“Technical Assessments” (as defined in the VALMIN
 
Code):
This report does not include a determination of the status of tenure (as required
 
by paragraph
7.2 of the VALMIN Code) on the basis that tenure was separately
 
reviewed by Coronado’s
 
legal
advisors.
This
 
report
 
does
 
not
 
include
 
separate
 
commentary
 
on
 
the
 
reasonableness
 
and
 
quality
 
of
 
the
Resources and Reserves estimates
 
and the basis on which they have been reported (as required
 
by
paragraph
 
7.3
 
of
 
the
 
VALMIN
 
Code).
 
MM&A
 
did
 
not
 
consider
 
that
 
this
 
was
 
appropriate
 
in
circumstances
 
where MM&A
 
was engaged
 
for
 
the specific
 
purpose of
 
preparing
 
those estimates.
 
However,
 
MM&A
 
notes
 
that,
 
in
 
accordance
 
with
 
its
 
usual
 
practice,
 
a
 
separate
 
team
 
of
 
MM&A
employees undertook a peer review of this report and confirmed that both
 
the process followed by
the
 
authors
 
of
 
this
 
report
 
and
 
the
 
estimates
 
prepared
 
were
 
reasonable
 
and
 
comply
 
with
 
the
requirements of the JORC Code.
 
 
ex964p2i0
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
The information in this TRS
 
related to coal resources and reserves is
 
based on, and fairly
 
represents,
information compiled by the QPs.
 
At the time of reporting,
 
MM&A’s QPs have sufficient experience
relevant
 
to the
 
style of
 
mineralization
 
and type
 
of deposit
 
under consideration
 
and to
 
the activity
they are undertaking to qualify as a QP as defined by Regulation S-K 1300 and the JORC Code.
 
Each
QP consents
 
to the
 
inclusion in
 
this report
 
of the
 
matters
 
based on
 
their information
 
in the
 
form
and context in which it appears.
Marshall
 
Miller
 
&
 
Associates,
 
Inc.
 
(
MM&A
)
 
hereby
 
consents
 
to
 
the
 
use
 
of
 
the
 
information
contained in this report
 
dated December 31, 2022, relating
 
to estimates of
 
coal resources and coal
reserves controlled by Coronado.
Qualified Person:
/s/ Marshall Miller & Associates, Inc.
Date:
February 15, 2023
ex964p2i0
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
i
Table
 
of
 
Contents
1
Executive Summary ................................................................
 
................................
 
...........
 
1
1.1
Property Description .............................................................................................
 
1
1.2
Ownership .............................................................................................................
 
2
1.3
Geology
 
..................................................................................................................
 
2
1.4
Exploration Status .................................................................................................
 
3
1.5
Operations and Development ...............................................................................
 
3
1.6
Mineral Resource ..................................................................................................
 
3
1.7
Mineral Reserve ....................................................................................................
 
4
1.8
Capital Summary ...................................................................................................
 
5
1.9
Operating Costs .....................................................................................................
 
5
1.10
Economic Evaluation .............................................................................................
 
6
1.10.1
Discounted Cash Flow Analysis .............................................................
 
10
1.10.2
Sensitivity Analysis ................................................................................
 
10
1.11
Permitting
 
............................................................................................................
 
11
1.12
Conclusion and Recommendations
 
.....................................................................
 
11
2
Introduction
 
................................
 
................................
 
................................
 
.................... 12
2.1
Registrant and Terms
 
of Reference
 
.....................................................................
 
12
2.2
Information Sources ............................................................................................
 
12
2.3
Personal Inspections ...........................................................................................
 
14
3
Property Description ................................
 
................................
 
................................
 
.......
 
14
3.1
Location ...............................................................................................................
 
14
3.2
Titles, Claims or Leases
 
........................................................................................
 
14
3.3
Mineral Rights .....................................................................................................
 
14
3.4
Encumbrances .....................................................................................................
 
15
3.5
Other Risks...........................................................................................................
 
15
4
Accessibility, Climate,
 
Local Resources, Infrastructure and Physiography
 
......................... 15
4.1
Topography,
 
Elevation and Vegetation ...............................................................
 
15
4.2
Access and Transport ..........................................................................................
 
16
4.3
Proximity to Population Centers .........................................................................
 
16
4.4
Climate and Length of Operating Season
 
............................................................
 
16
4.5
Infrastructure ......................................................................................................
 
16
5
History ................................................................
 
................................
 
............................ 17
5.1
Previous Operation
 
..............................................................................................
 
17
5.2
Previous Exploration ...........................................................................................
 
17
6
Geological Setting, Mineralization and Deposit ................................................................ 17
ex964p2i0
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
ii
6.1
Regional, Local and Property Geology ................................................................
 
17
6.2
Mineralization .....................................................................................................
 
18
6.3
Deposits
 
...............................................................................................................
 
20
7
Exploration................................
 
................................
 
................................
 
...................... 20
7.1
Nature and Extent of Exploration .......................................................................
 
20
7.2
Non-Drilling Procedures and Parameters
 
...........................................................
 
21
7.3
Drilling Procedures ..............................................................................................
 
21
7.4
Hydrology ............................................................................................................
 
22
7.5
Geotechnical Data ...............................................................................................
 
22
8
Sample Preparation, Analyses and Security ................................
 
................................
 
.....
 
23
8.1
Prior to Sending to the Lab
 
..................................................................................
 
23
8.2
Lab Procedures
 
....................................................................................................
 
23
9
Data Verification ................................
 
................................
 
................................
 
............. 24
9.1
Procedures of Qualified Person ..........................................................................
 
24
9.2
Limitations
 
...........................................................................................................
 
24
9.3
Opinion of Qualified Person
 
................................................................................
 
24
10
Mineral Processing and Metallurgical Testing
 
................................
 
................................
 
..
 
25
10.1
Testing
 
Procedures
 
..............................................................................................
 
25
10.2
Relationship of Tests
 
to the Whole
 
.....................................................................
 
25
10.3
Lab Information
 
...................................................................................................
 
25
10.4
Relevant Results ..................................................................................................
 
26
11
Mineral Resource Estimates
 
................................
 
................................
 
............................ 26
11.1
Assumptions, Parameters and Methodology......................................................
 
26
11.1.1
Geostatistical Analysis
 
...........................................................................
 
27
11.2
Qualified Person’s
 
Estimates
 
...............................................................................
 
31
11.3
Qualified Person’s
 
Opinion
 
..................................................................................
 
31
12
Mineral Reserve Estimates ................................
 
................................
 
.............................. 31
12.1
Assumptions, Parameters and Methodology......................................................
 
31
12.2
Qualified Person’s
 
Estimates
 
...............................................................................
 
33
12.3
Qualified Person’s
 
Opinion
 
..................................................................................
 
34
13
Mining Methods
 
................................
 
................................
 
................................
 
.............. 34
13.1
Geotech and Hydrology
 
.......................................................................................
 
35
13.2
Production Rates .................................................................................................
 
35
13.3
Mining Related Requirements
 
............................................................................
 
37
13.4
Required Equipment and Personnel ...................................................................
 
37
13.4.1
Mine:
 
Pangburn
 
....................................................................................
 
37
13.4.2
Mine: Shaner
 
.........................................................................................
 
39
ex964p2i0
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
iii
13.4.3
Mine: Fallowfield
 
...................................................................................
 
40
14
Processing and Recovery Methods
 
................................
 
................................
 
................... 41
14.1
Description or Flowsheet ....................................................................................
 
41
14.2
Requirements for Energy,
 
Water,
 
Material and Personnel ................................
 
41
15
Infrastructure
 
................................
 
................................
 
................................
 
.................. 42
16
Market Studies
 
................................
 
................................
 
................................
 
................ 43
16.1
Market Description
 
..............................................................................................
 
43
16.2
Price Forecasts
 
.....................................................................................................
 
43
16.3
Contract Requirements .......................................................................................
 
44
17
Environmental Studies, Permitting and Plans, Negotiations or Agreements
 
with Local
Individuals
 
................................
 
................................
 
................................
 
.............. 44
17.1
Results of Studies ................................................................................................
 
44
17.2
Requirements and Plans for Waste
 
Disposal ......................................................
 
44
17.3
Permit Requirements and Status ........................................................................
 
44
17.4
Local Plans, Negotiations or Agreements ...........................................................
 
45
17.5
Mine Closure Plans
 
..............................................................................................
 
46
17.6
Qualified Person’s
 
Opinion
 
..................................................................................
 
46
18
Capital and Operating Costs
 
................................
 
................................
 
............................. 46
18.1
Capital Cost Estimate...........................................................................................
 
46
18.2
Operating Cost Estimate .....................................................................................
 
47
19
Economic Analysis ................................................................
 
................................
 
........... 48
19.1
Assumptions, Parameters and Methods .............................................................
 
48
19.2
Results .................................................................................................................
 
50
19.3
Sensitivity ............................................................................................................
 
55
20
Adjacent Properties
 
................................
 
................................
 
................................
 
......... 56
20.1
Information Used ................................................................................................
 
56
21
Other Relevant Data and Information ................................................................
 
.............. 56
22
Interpretation and Conclusions
 
................................
 
................................
 
........................ 56
22.1
Conclusion ...........................................................................................................
 
56
22.2
Risk Factors
 
..........................................................................................................
 
56
22.2.1
Governing Assumptions ........................................................................
 
57
22.2.2
Limitations
 
.............................................................................................
 
58
22.2.3
Methodology
 
.........................................................................................
 
58
22.2.4
Development of the Risk Matrix ...........................................................
 
58
22.2.5
Categorization of Risk Levels and Color Code Convention ...................
 
61
22.2.6
Description of the Coal Property ..........................................................
 
61
22.2.7
Summary of Residual Risk Ratings ........................................................
 
62
ex964p2i0
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
iv
22.2.8
Risk Factors............................................................................................
 
62
23
Recommendations ................................
 
................................
 
................................
 
.......... 68
24
References ................................
 
................................
 
................................
 
...................... 68
25
Reliance on Information Provided by the Registrant
 
................................
 
........................ 69
F
IGURES
(
IN
R
EPORT
)
Figure 1-1:
 
Mon Valley Complex Property
 
Location Map
 
...................................................................
 
2
Figure 1-2:
 
CAPEX
 
................................................................................................................................
 
5
Figure 1-3:
 
OPEX
 
..................................................................................................................................
 
6
Figure 1-4:
 
Sensitivity of NPV
 
............................................................................................................
 
11
Figure 6-1:
 
Stratigraphic Column .....................................................................................................
 
19
Figure 7-1:
 
Mon Valley Cross-Section ...............................................................................................
 
21
Figure 11-1: Histogram of the Total
 
Seam Thickness for the Upper Freeport Seam Present in the
Mon Valley Complex .......................................................................................................
 
28
Figure 11-2: Scatter plot of the Total
 
Seam Thickness for the Upper Freeport Seam Present in the
Mon Valley Complex .......................................................................................................
 
28
Figure 11-3:
 
Variogram of the Total
 
Seam Thickness for the Upper Freeport Seam
 
Present in the
Mon Valley Complex .......................................................................................................
 
29
Figure 11-4:
 
Result of DHSA for the Upper Freeport Seam Present in the Mon Valley
 
Complex ....
 
30
Figure 13-1:
 
Proposed Pangburn Plant and Mine Site Infrastructure ..............................................
 
39
Figure 18-1:
 
CAPEX
 
............................................................................................................................
 
47
Figure 19-1:
 
Cash Costs per Tonne
 
...................................................................................................
 
51
Figure 19-2:
 
Sensitivity of NPV
 
..........................................................................................................
 
55
T
ABLES
(
IN
R
EPORT
)
Table 1-1:
 
Coal Resources Summary as of December 31, 2022 .........................................................
 
3
Table 1-2:
 
Coal Summary (ROM Basis (Moist)) as of December 31, 2022 (Mt)..................................
 
4
Table 1-3:
 
Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022 (Mt) ...........
 
4
Table 1-4:
 
Life-of-Mine Tonnage,
 
P&L before Tax,
 
and EBITDA ($000)
 
..............................................
 
7
Table 1-5:
 
Project Cash Flow Summary (000)
*
 
....................................................................................
 
7
Table 2-1:
 
Information Provided to MM&A by Coronado ................................................................
 
13
Table 11-1:
 
General Reserve and Resource Criteria .........................................................................
 
27
Table 11-2:
 
DHSA Results Summary for Radius from a Central Point
 
..............................................
 
30
Table 11-3:
 
Coal Resources Summary as of December 31, 2022 .....................................................
 
31
Table 12-1:
 
Coal Summary (ROM Basis (Moist)) as of December 31, 2022 (Mt) .............................
 
33
Table 12-2:
 
Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022 (Mt) .......
 
34
Table 13-1:
 
Production Summary by Mine by Year (000)
 
.................................................................
 
36
Table 16-1:
 
Quality Specifications by Product ..................................................................................
 
43
Table 18-1:
 
Estimated Coal Production Taxes
 
and Sales Costs
 
.........................................................
 
48
Table 18-2:
 
Mon Valley Operating
 
Costs ..........................................................................................
 
48
Table 19-1:
 
Life-of-Mine Tonnage,
 
P&L before Tax,
 
and EBITDA ($000)
 
..........................................
 
51
Table 19-2:
 
Summary of Mon Valley Key Financial Performance
 
Metrics (2023-2030)
 
...................
 
52
Table 19-3:
 
Project Cash Flow Summary (000)
*
 
................................................................................
 
52
Table 22-1:
 
Probability Level Table ...................................................................................................
 
59
ex964p2i0
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
v
Table 22-2:
 
Consequence Level Table
 
...............................................................................................
 
60
Table 22-3:
 
Risk Matrix .....................................................................................................................
 
61
Table 22-4:
 
Risk Assessment Matrix .................................................................................................
 
62
Table 22-5:
 
Geological and Coal Resource Risk Assessment (Risks 1 and 2)
 
....................................
 
63
Table 22-6:
 
Environmental (Risks 3 and 4) .......................................................................................
 
64
Table
 
22-7:
 
Regulatory Requirements (Risk 5) .................................................................................
 
64
Table 22-8:
 
Market and Transportation
 
(Risks 6 and 7) ...................................................................
 
65
Table 22-9:
 
Market and Transportation
 
(Risk 8)
 
...............................................................................
 
65
Table 22-10:
 
Methane Management (Risk 9) ...................................................................................
 
66
Table 22-11:
 
Mine Fires (Risk 10)
 
......................................................................................................
 
67
Table 22-12:
 
Availability of Supplies and Equipment (Risk 11)
 
.........................................................
 
67
Table 22-13:
 
Labor – Work Stoppage (Risk 12)
 
.................................................................................
 
68
Table 22-14:
 
Labor – Retirement (Risk 13) .......................................................................................
 
68
Table
 
25-1:
 
Information from Registrant
 
Relied Upon by MM&A ...................................................
 
69
Appendices
A ..........................................................................................................................
 
MM&A Qualifications
B ....................................................................................................................................................
 
Maps
C ................................................................................................................................
 
Glossary of Terms
D ........................................................................................................................................
 
JORC Table
 
1
ex964p2i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
1
1
Executive Summary
1.1
Property Description
Coronado Global Resources
 
Inc. (
Coronado
)
authorized
Marshall Miller &
 
Associates, Inc. (
MM&A
)
to prepare this Technical Report Summary (
TRS
) of its controlled coal
 
resources and reserves for the
Mon Valley
 
Complex in southwestern
 
Pennsylvania (Mon
 
Valley
 
or the
Property
).
 
An updated
 
TRS
was
 
prepared
 
in February
 
2023
 
due to
 
material
 
differences
 
in the
 
key
 
financial modifying
 
factors
including coal
 
sales price
 
assumptions, operating
 
costs and
 
capital costs
 
from December
 
31, 2021
to December 31, 2022.
 
Coal sales price assumptions are discussed in
 
Sections 12 and 16
 
of the TRS,
while operating
 
costs and
 
capital costs
 
are discussed
 
in
Sections 18 and
 
19
 
of the TRS.
 
The report
provides
 
a
 
statement
 
of
 
coal
 
resources
 
and
 
coal
 
reserves
 
for
 
Coronado,
 
as
 
defined
 
under
 
the
Australasian Code for
 
Reporting of Exploration
 
Results, Mineral Resources
 
and Ore
 
Reserves
(
JORC
Code
) as
 
well as
 
under Subpart
 
1300 of
 
Regulation
 
S-K (Regulation
 
S-K 1300)
 
promulgated
 
by the
United
 
States
 
Securities
 
and
 
Exchange
 
Commission
 
(
SEC
)
.
 
This
 
report
 
was
 
also
 
prepared
 
in
accordance
 
with
 
the
Australasian
 
Code
 
for
 
Public
 
Reporting
 
of
 
Technical
 
Assessments
 
and
Valuations of Mineral Assets
(
VALMIN Code
).
The Mon
 
Valley
 
property is
 
comprised of
 
three separate
 
reserve holdings,
 
namely,
 
the Pangburn,
Shaner
 
and
 
Fallowfield
 
proposed
 
underground
 
mines
 
in
 
the
 
Upper
 
Freeport
 
seam.
 
All
 
three
respective
 
reserve
 
areas
 
are
 
greenfield
 
sites
 
and
 
are
 
undeveloped.
 
The
 
three
 
mines
 
have
 
been
projected
 
to
 
operate
 
independently,
 
with
 
production
 
initially
 
beginning
 
at
 
Pangburn.
 
Shaner
 
is
projected
 
to
 
come
 
online
 
as
 
replacement
 
production
 
for
 
Pangburn,
 
and
 
Fallowfield
 
represents
expanded Mon Valley
 
production after Pangburn
 
is in full production.
 
In addition to the individual
mine/plant sites,
 
a barge
 
loading dock on
 
the Monongahela
 
River adjacent
 
to the
 
Pangburn site
 
is
proposed and will
 
be used to
 
ship clean coal
 
for all three
 
mines.
 
Each mine site
 
will include a
 
coal
preparation plant and all necessary surface facilities.
Coal
 
resources
 
and
 
coal
 
reserves
 
are
 
herein
 
reported
 
in
 
metric
 
units
 
of
 
measurement
 
and
 
are
rounded to millions of metric tonnes (
Mt
).
 
The Mon
 
Valley
 
properties are
 
located approximately
 
16 kilometers
 
to 32
 
kilometers southeast
 
of
Pittsburgh,
 
Pennsylvania
 
(see
Figure 1-1
).
 
The property
 
is composed
 
of 41,615
 
total
 
hectares,
 
of
which 1,339 are leased from private landholders under two leases, and 40,276 hectares
 
are owned
by
 
Coronado.
 
Subject to
 
Coronado’s
 
exercising
 
its
 
renewal
 
rights thereunder,
 
both
 
of the
 
leases
expire upon exhaustion of the relevant
 
coal reserves, which is expected to occur in 2100.
ex964p2i0
 
 
ex964p10i1
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Figure 1-1:
 
Mon Valley Complex Property Location Map
1.2
Ownership
Mineral rights for
 
the Property were
 
formerly controlled by
Consolidation Coal
 
Company (
CONSOL
)
.
 
Coronado acquired the Mon Valley
 
properties from CONSOL in March 2016.
1.3
Geology
There are currently no active operations in
 
the Mon Valley complex.
 
Strata of economic interest for
this TRS are of the Pennsylvanian-age Allegheny Formation, and the subject
 
Upper Freeport seam is
the
 
principal
 
coal
 
seam
 
of
 
interest
 
for
 
Coronado.
 
The
 
Upper
 
Freeport
 
seam
 
has
 
been
 
mined
extensively in the region.
 
The seam is situated below drainage throughout the Property and will be
accessed by constructed mine shafts and slopes.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
1.4
Exploration Status
The
 
Property
 
has
 
been
 
explored
 
extensively,
 
largely
 
by
 
drilling
 
using
 
continuous
 
coring
 
method,
rotary
 
drilling, and
 
by downhole
 
geophysical
 
methods.
 
The majority
 
of the
 
data
 
was
 
acquired
 
or
generated
 
by previous
 
owners of
 
the Property.
 
These sources
 
comprise the
 
primary data
 
used in
the evaluation of the coal resources
 
and coal reserves on the Property.
 
MM&A examined the data
available
 
for the
 
evaluation
 
and incorporated
 
all pertinent
 
information into
 
this TRS.
 
Where data
appeared
 
to be
 
anomalous or
 
not representative,
 
that information
 
was excluded
 
from the
 
digital
databases and subsequent processing by MM&A.
 
Ongoing exploration has been carried out by Coronado since acquiring
 
the Mon Valley properties.
 
1.5
Operations and Development
Coronado
 
currently has
 
no active
 
operations
 
in the
 
Mon Valley
 
complex.
 
The mines
 
will produce
coal that is suitable for the high-volatile metallurgical
 
coal markets.
The
 
preliminary
 
design
 
for
 
the
 
Pangburn
 
mine
 
surface
 
facilities
 
was
 
provided
 
by
 
Coronado.
 
The
facilities
 
include
 
offices,
 
warehouses,
 
shops,
 
a
 
bathhouse
 
for
 
personnel,
 
a
 
preparation
 
plant
 
to
process run-of-mine (
ROM
) coal, a refuse area with a designed capacity
 
of approximately 35 million
refuse
 
tonnes,
 
raw
 
coal
 
storage
 
at
 
the
 
plant
 
totaling
 
approximately
 
100,000
 
tonnes,
 
clean
 
coal
storage
 
at the
 
plant site
 
of approximately
 
54,000 tonnes,
 
and three
 
clean coal
 
stockpiles adjacent
to the
 
dock loading facility
 
on the Monongahela
 
River.
 
The three
 
river stockpiles
 
have a
 
designed
capacity of
 
approximately
 
266,000 tonnes.
 
Processes are
 
expected
 
to be
 
typical of
 
those used
 
at
operating
 
coal-processing plants
 
and the
 
coal industry
 
in general.
 
The river
 
dock is
 
anticipated to
also
 
support
 
production
 
from
 
the
 
planned
 
Fallowfield
 
and
 
Shaner
 
operations.
 
Room-and-pillar
mining will be employed at these properties.
1.6
Mineral Resource
Mineral
 
resources,
 
representing
 
in-situ
 
coal
 
from
 
a
 
portion
 
of
 
which
 
reserves
 
are
 
derived,
 
are
presented below.
 
A coal resource estimate, summarized
 
in
Table 1-1
, was prepared as
 
of December
31, 2022, for property controlled by Coronado.
Table 1-1:
 
Coal Resources Summary as of December 31, 2022
 
Coal Resource (Dry Tonnes, In Situ, Mt)
Resource Quality (Dry)
Area
Measured
Indicated
Inferred
Total
Ash%
Sulfur%
VM%
Inclusive of Reserves
291.0
213.5
9.3
513.8
31
1.4
26
Exclusive of Reserve
0.0
0.0
0.0
0.0
Total 12/31/2022
291.0
213.5
9.3
513.8
Note:
 
Resource tonnes are inclusive of reserve tonnes since they include the in-situ tonnes from which recoverable coal reserves are derived.
Note 2:
 
Coal resources are reported on a dry basis.
 
Surface moisture and inherent moisture are excluded.
Note 3: The Mon Valley properties do not have any resource tonnes exclusive of reserves as of December 31, 2022.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
1.7
Mineral Reserve
Reserve tonnage
 
estimates provided
 
herein report
 
coal reserves
 
derived from
 
the in-situ resource
tonnes
 
presented
 
in
Table
 
1-1
,
 
and
 
not
 
in
 
addition
 
to
 
coal
 
resources.
 
Proven
 
and
 
probable
 
coal
reserves
 
were
 
derived
 
from
 
the
 
defined
 
coal
 
resource
 
considering
 
relevant
 
mining,
 
processing,
infrastructure,
 
economic
 
(including
 
estimates
 
of
 
capital,
 
revenue,
 
and
 
cost),
 
marketing,
 
legal,
environmental,
 
socio-economic
 
and regulatory
 
factors.
 
The
 
Resource
 
estimate
 
has been
 
used
 
as
the basis
 
for this Reserve
 
calculation, which utilizes
 
a reasonable Preliminary
 
Feasibility Study, a Life-
of Mine (
LOM
) Mine Plan and practical recovery factors.
 
Production modeling was completed with
an effective start date
 
of May 1, 2032.
 
Factors
 
that
 
would
 
typically
 
preclude
 
conversion
 
of
 
a
 
coal
 
resource
 
to
 
coal
 
reserve
 
include
 
the
following:
 
inferred
 
resource
 
classification;
 
absence
 
of
 
coal
 
quality;
 
poor
 
mine
 
recovery;
 
lack
 
of
access;
 
geological
 
encumbrances
 
associated
 
with
 
overlying
 
and underlying
 
strata;
 
seam thinning;
structural
 
complication;
 
and
 
insufficient
 
exploration
 
have
 
all
 
been
 
considered.
 
Reserve
consideration
 
excludes
 
those
 
portions
 
of
 
the
 
resource
 
area
 
which
 
exhibit
 
the
 
aforementioned
geological and operational encumbrances.
 
Table 1-2:
 
Coal Summary (ROM Basis (Moist)) as of December 31, 2022 (Mt)
 
Demonstrated Coal Reserves (Mt, Moist ROM)
 
 
 
 
By Reliability Category
By Mining Type
By Control Type
Quality (Dry)
Area / Mine
Proved
Probable
Total
Surface
UG
Owned
Leased
Ash
Sulfur
Vol
Mon Valley
113.9
83.2
197.1
0.0
197.1
195.7
1.4
37
1.2
23
Coal reserves are presented on a ROM basis in
Table 1-2
.
 
Proven and probable coal reserves were
derived from the defined in-situ coal resource considering relevant processing, economic (including
technical estimates of capital,
 
revenue, and cost), marketing, legal,
 
environmental, socioeconomic,
and
 
regulatory
 
factors.
 
The
 
proven
 
and
 
probable
 
coal
 
reserves
 
on the
 
Property
 
are
 
summarized
below in
Table 1-3
.
Table 1-3:
 
Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022 (Mt)
 
Demonstrated Coal Reserves (Wet Tons,
 
Washed or Direct Shipped, Mt)
Quality (Dry Basis)
 
By Reliability Category
By Mining Type
By Control Type
Property
Proven
Probable
Total
Surface
UG
Owned
Leased
Ash%
Sulfur%
VM%
Mon Valley
77.8
56.6
134.4
0.0
134.4
133.4
1.0
8
1.2
35
 
Note: Marketable reserve tonnes are reported on a moist basis, including a combination of surface and inherent moisture.
 
The combination of
surface and inherent moisture is modeled at 6-percent.
 
Actual product moisture is dependent upon multiple geological factors, operational
factors, and product contract specifications and can exceed 8-percent.
 
As such, the modeled moisture values provide a level of conservatism
for reserve reporting.
 
Life-of-mine sulfur for Pangburn is an estimated 1.21%; however, overall
 
Mon Valley Complex reserve average is
1.36% sulfur.
In summary, Coronado controls a total of 134.4
 
Mt (moist basis) of
 
marketable coal reserves at Mon
Valley,
 
as of December
 
31, 2022.
 
Of that total, 58 percent are proven, and
 
42 percent are probable.
 
There are 133.4 Mt
 
of owned coal reserves
 
and 1.0 Mt
 
of leased coal reserves.
 
All of the
 
Mon Valley
ex964p2i0
 
 
ex964p13i0
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
reserves are
 
considered suitable
 
for the
 
metallurgical coal
 
market.
 
All of the
 
Mon Valley
 
reserves
are unassigned.
1.8
Capital Summary
The
 
MM&A
 
financial
 
model
 
includes
 
provisions
 
for
 
operating
 
equipment
 
at
 
the
 
proposed
 
Mon
Valley operations.
 
MM&A’s capital schedules assume that major
 
equipment rebuilds occur
 
over the
course
 
of
 
each
 
machine’s
 
remaining
 
assumed
 
operating
 
life.
 
Replacement
 
equipment
 
was
scheduled
 
based
 
on
 
MM&A’s
 
experience
 
and
 
knowledge
 
of
 
mining
 
equipment
 
and
 
industry
standards with respect to the useful life of
 
such equipment.
 
A summary of
 
the estimated capital for
the Property is provided in
Figure 1-2
 
below.
Figure 1-2:
 
CAPEX
1.9
Operating Costs
MM&A used the Coronado historical and/or budget cost information
 
for comparable operations as
a reference
 
and developed
 
personnel
 
schedules for
 
the mine
 
and support
 
facilities.
 
Hourly labor
rates
 
and
 
salaries
 
were
 
based
 
upon
 
information
 
contained
 
in
 
Coronado’s
 
financial
 
summaries.
 
Fringe
 
benefit
 
costs
 
were
 
developed
 
for
 
vacation
 
and
 
holidays,
 
federal
 
and
 
state
 
unemployment
insurance,
 
retirement,
 
workers’
 
compensation
 
and
 
pneumoconiosis,
 
casualty
 
and
 
life
 
insurance,
healthcare, and bonuses.
 
A cost factor
 
for mine supplies
 
was developed that
 
relates expenditures
to
 
mine advance
 
rates
 
for
 
roof
 
control
 
costs
 
and other
 
mine supply
 
costs
 
at underground
 
mines.
 
Other
 
factors
 
were
 
developed
 
for
 
maintenance
 
and
 
repair
 
costs,
 
rentals,
 
mine
 
power,
 
outside
services and other direct mining costs.
 
ex964p2i0
 
 
ex964p14i0
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
Operating-cost
 
factors
 
were
 
also
 
developed
 
for
 
the
 
coal
 
preparation
 
plant
 
processing,
 
refuse
handling, coal loading, property taxes,
 
and insurance and bonding.
 
Appropriate royalty
 
rates were
assigned for production from leased coal lands and sales taxes were calculated for the federal black
lung excise tax, and federal
 
reclamation fees.
A summary of the projected operating costs for the Property
 
is provided in
Figure 1-3
.
Figure 1-3:
 
OPEX
1.10
Economic Evaluation
The pre-feasibility financial
 
model prepared for
 
this TRS
 
was developed to
 
test the
 
economic viability
of
 
each
 
coal
 
resource
 
area.
 
The
 
results
 
of
 
this
 
financial
 
model
 
are
 
not
 
intended
 
to
 
represent
 
a
bankable
 
feasibility
 
study,
 
required
 
for
 
financing
 
of
 
any
 
current
 
or
 
future
 
mining
 
operations
contemplated
 
for the Coronado
 
properties, but are
 
intended to establish
 
the economic viability
 
of
the
 
estimated
 
coal
 
reserves.
 
Cash
 
flows
 
are
 
simulated
 
on
 
an
 
annual
 
basis
 
in
 
nominal
 
dollars
assuming a 2% inflation rate based on
 
projected production from the coal reserves.
 
The discounted
cash flow analysis presented herein is based on an effective
 
date of January 1, 2023.
 
On an un-levered basis, the net
 
present value (
NPV
) of the project cash flow
 
after taxes represents
the Enterprise
 
Value of
 
the project.
 
The project cash
 
flow,
 
excluding debt
 
service, is calculated
 
by
subtracting direct
 
and indirect
 
operating expenses
 
and capital
 
expenditures from
 
revenue.
 
Direct
costs
 
include
 
labor,
 
operating
 
supplies,
 
maintenance
 
and
 
repairs,
 
facilities
 
costs
 
for
 
materials
handling,
 
coal
 
preparation,
 
refuse
 
disposal,
 
coal
 
loading,
 
reclamation
 
and
 
general
 
and
administrative costs.
 
Indirect costs include statutory and legally agreed
 
upon fees related to direct
extraction
 
of
 
the
 
mineral.
 
The
 
indirect
 
costs
 
are
 
the
 
Federal
 
black
 
lung
 
tax,
 
Federal
 
reclamation
taxes, property taxes,
 
coal production royalties, and income taxes.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
Table
 
1-4
 
shows LOM tonnage, profit
 
& loss (
P&L
), and earnings before income tax,
 
depreciation &
amortization (
EBITDA
)
 
for each proposed Coronado mine at Mon Valley
 
.
Table 1-4:
 
Life-of-Mine Tonnage,
 
P&L before Tax,
 
and EBITDA ($000)
 
LOM
LOM
P&L
LOM
EBITDA
 
Tonnes
*
Pre-Tax
 
P&L
Per Tonne
EBITDA
Per Ton
 
ne
Pangburn
 
14,376
 
 
$387,034
 
 
$26.92
 
 
$998,549
 
 
$69.46
 
Fallowfield
 
72,640
 
 
$9,545,381
 
 
$131.41
 
 
$11,922,910
 
 
$164.14
 
Shaner
 
48,294
 
 
$3,824,932
 
 
$79.20
 
 
$4,964,384
 
 
$102.80
 
Consolidated PA Deep Mines
 
135,309
 
 
$13,757,346
 
 
$101.67
 
 
$17,885,844
 
 
$132.18
 
Note:
 
*Financial model includes 0.9
 
million tonnes of
 
inferred coal
 
production.
 
Inferred coal
 
represents 0.6%
of the total production, and none of this coal was included in the estimate of reserves.
As
 
shown
 
in
Table
 
1-4,
 
all
 
of
 
the
 
mines
 
analyzed
 
show
 
positive
 
EBITDA
 
over
 
the
 
LOM.
 
Overall,
Coronado’s
 
consolidated operations
 
show positive
 
LOM P&L
 
and LOM
 
EBITDA of
 
$13.8 billion and
$17.9 billion, respectively.
Coronado’s consolidated
 
Mon Valley cash flow summary in nominal dollars assuming a 2% inflation
rate, excluding debt
 
service, is shown in
Table 1-5
 
below.
Table 1-5:
 
Project Cash Flow Summary (000)
*
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
Total
2027
2028
2029
2030
2031
Production & Sales tonnes
135,311
-
-
-
-
-
Total Revenue
$37,567,900
$-
$-
$-
$-
$-
EBITDA
$12,956,210
$(388)
$(388)
$(388)
$(388)
$(388)
Net Income
$5,500,454
$(388)
$(388)
$(388)
$(388)
$(388)
Net Cash Provided by Operating Activities
$9,101,755
$(388)
$(388)
$(388)
$(388)
$(328)
Purchases of Property, Plant, and
 
Equipment
$(3,799,269)
$-
$(5,533)
$(31,868)
$(36,156)
$(233,778)
Net Cash Flow
$5,302,486
$(388)
$(5,921)
$(32,256)
$(36,544)
$(234,106)
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2032
2033
2034
2035
2036
2037
Production & Sales tonnes
399
1,810
1,875
1,958
2,029
2,030
Total Revenue
$54,019
$249,974
$264,268
$281,660
$297,887
$304,147
EBITDA
$25,792
$134,660
$143,768
$156,696
$168,610
$172,267
Net Income
$(55,860)
$50,305
$57,801
$63,866
$62,105
$73,365
Net Cash Provided by Operating Activities
$20,744
$112,463
$139,070
$147,100
$143,903
$154,203
Purchases of Property, Plant, and
 
Equipment
$(223,890)
$(6,093)
$(1,522)
$(23,061)
$(19,766)
$(224,451)
Net Cash Flow
$(203,146)
$106,370
$137,548
$124,039
$124,137
$(70,247)
 
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2038
2039
2040
2041
2042
2043
Production & Sales tonnes
2,062
1,960
1,762
2,366
1,804
1,724
Total Revenue
$315,229
$305,758
$280,640
$384,512
$299,179
$291,805
EBITDA
$178,445
$166,211
$140,888
$208,852
$140,775
$133,692
Net Income
$57,967
$72,886
$45,385
$92,177
$64,942
$53,969
Net Cash Provided by Operating Activities
$165,161
$154,094
$130,479
$163,610
$106,491
$111,512
Purchases of Property, Plant, and
 
Equipment
$(202,332)
$(18,063)
$(15,711)
$(22,144)
$(8,827)
$(14,141)
Net Cash Flow
$(37,170)
$136,031
$114,769
$141,466
$97,664
$97,370
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2044
2045
2046
2047
2048
2049
Production & Sales tonnes
1,717
1,641
1,719
1,657
1,582
1,704
Total Revenue
$296,479
$289,255
$309,181
$304,039
$296,312
$325,698
EBITDA
$135,584
$128,438
$141,700
$136,176
$128,554
$149,022
Net Income
$67,285
$78,524
$86,380
$81,215
$75,423
$86,668
Net Cash Provided by Operating Activities
$115,188
$109,995
$111,937
$112,263
$106,871
$118,353
Purchases of Property, Plant, and
 
Equipment
$(106,672)
$(33,173)
$(3,378)
$(5,687)
$(21,727)
$(45,062)
Net Cash Flow
$8,515
$76,822
$108,559
$106,575
$85,144
$73,291
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2050
2051
2052
2053
2054
2055
Production & Sales tonnes
1,656
1,732
1,702
1,596
1,642
1,750
Total Revenue
$322,894
$344,510
$345,451
$330,631
$347,164
$377,485
EBITDA
$144,852
$159,462
$158,323
$145,127
$155,737
$176,479
Net Income
$83,039
$106,381
$104,840
$90,665
$96,667
$115,492
Net Cash Provided by Operating Activities
$120,921
$126,371
$126,005
$119,262
$124,313
$138,665
Purchases of Property, Plant, and
 
Equipment
$(25,998)
$(4,218)
$(20,921)
$(39,520)
$(28,042)
$(37,598)
Net Cash Flow
$94,923
$122,153
$105,084
$79,742
$96,271
$101,067
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2056
2057
2058
2059
2060
2061
Production & Sales tonnes
1,751
2,609
3,576
3,732
3,846
3,762
Total Revenue
$385,399
$586,004
$819,598
$872,775
$917,689
$916,057
EBITDA
$180,413
$271,312
$391,320
$425,108
$454,572
$448,794
Net Income
$139,507
$127,958
$209,809
$227,665
$251,397
$234,738
Net Cash Provided by Operating Activities
$160,731
$227,264
$308,925
$347,214
$369,575
$374,330
Purchases of Property, Plant, and
 
Equipment
$(549,006)
$(91,928)
$(36,973)
$(45,463)
$(22,284)
$(131,772)
Net Cash Flow
$(388,274)
$135,335
$271,952
$301,751
$347,291
$242,558
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2062
2063
2064
2065
2066
2067
Production & Sales tonnes
3,488
3,390
3,466
3,397
2,961
2,826
Total Revenue
$866,529
$859,453
$896,756
$896,840
$797,498
$776,640
EBITDA
$406,027
$398,694
$424,167
$429,339
$389,140
$382,069
Net Income
$203,176
$262,307
$274,392
$274,792
$235,580
$226,904
Net Cash Provided by Operating Activities
$352,593
$331,050
$333,667
$341,553
$322,289
$312,496
Purchases of Property, Plant, and
 
Equipment
$(58,035)
$(25,972)
$(64,621)
$(60,161)
$(120,574)
$(57,818)
Net Cash Flow
$294,558
$305,078
$269,045
$281,391
$201,715
$254,678
 
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
9
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2068
2069
2070
2071
2072
2073
Production & Sales tonnes
2,479
2,318
2,289
1,438
1,988
1,993
Total Revenue
$695,232
$663,381
$668,340
$428,531
$604,475
$618,406
EBITDA
$345,064
$315,895
$324,744
$177,919
$303,204
$313,068
Net Income
$200,677
$180,616
$183,214
$102,106
$185,575
$200,522
Net Cash Provided by Operating Activities
$290,478
$265,928
$264,648
$126,035
$207,165
$242,028
Purchases of Property, Plant, and
 
Equipment
$(118,193)
$(38,552)
$(41,672)
$(26,538)
$(44,402)
$(30,383)
Net Cash Flow
$172,285
$227,376
$222,976
$99,497
$162,763
$211,645
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2074
2075
2076
2077
2078
2079
Production & Sales tonnes
1,822
2,098
2,055
2,107
1,883
2,129
Total Revenue
$576,706
$614,741
$614,611
$642,871
$586,223
$676,320
EBITDA
$282,323
$306,812
$304,834
$325,855
$282,672
$345,761
Net Income
$178,585
$209,539
$202,684
$211,767
$179,763
$230,583
Net Cash Provided by Operating Activities
$227,691
$232,044
$237,019
$247,117
$225,397
$251,932
Purchases of Property, Plant, and
 
Equipment
$(3,360)
$(3,428)
$(42,925)
$(75,556)
$(16,116)
$(6,493)
Net Cash Flow
$224,330
$228,617
$194,094
$171,561
$209,281
$245,439
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2080
2081
2082
2083
2084
2085
Production & Sales tonnes
1,937
1,723
2,242
1,568
2,285
1,637
Total Revenue
$627,878
$570,149
$756,717
$540,176
$803,092
$587,274
EBITDA
$307,130
$261,187
$391,089
$241,080
$421,465
$261,759
Net Income
$201,018
$156,255
$247,475
$139,739
$281,600
$160,070
Net Cash Provided by Operating Activities
$240,316
$207,078
$272,041
$211,121
$285,491
$228,402
Purchases of Property, Plant, and
 
Equipment
$(25,860)
$(72,719)
$(39,361)
$(12,940)
$(20,396)
$(34,296)
Net Cash Flow
$214,456
$134,359
$232,679
$198,181
$265,095
$194,106
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2086
2087
2088
2089
2090
2091
Production & Sales tonnes
1,982
1,477
1,857
1,616
1,993
1,305
Total Revenue
$725,512
$551,606
$707,457
$628,246
$790,874
$528,487
EBITDA
$356,300
$233,497
$334,352
$278,449
$389,504
$199,352
Net Income
$224,911
$128,018
$209,340
$168,393
$251,821
$107,463
Net Cash Provided by Operating Activities
$252,946
$200,997
$235,620
$222,633
$275,062
$188,238
Purchases of Property, Plant, and
 
Equipment
$(42,736)
$(61,764)
$(27,589)
$(31,659)
$(4,613)
$(38,355)
Net Cash Flow
$210,209
$139,233
$208,030
$190,974
$270,449
$149,882
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2092
2093
2094
2095
2096
2097
Production & Sales tonnes
1,637
1,612
1,747
1,355
1,731
1,752
Total Revenue
$676,274
$679,478
$751,249
$594,733
$775,168
$800,781
EBITDA
$301,607
$299,832
$348,917
$215,004
$356,524
$378,911
Net Income
$176,267
$169,679
$213,755
$117,501
$219,452
$235,930
Net Cash Provided by Operating Activities
$211,547
$229,125
$256,552
$190,242
$246,204
$284,008
Purchases of Property, Plant, and
 
Equipment
$(81,778)
$(76,560)
$(4,993)
$(5,093)
$(47,001)
$-
Net Cash Flow
$129,769
$152,566
$251,558
$185,149
$199,203
$284,008
 
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
10
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2098
2099
2100
2101
2102
2103
Production & Sales tonnes
1,387
916
393
-
-
-
Total Revenue
$646,856
$435,993
$190,649
$-
$-
$-
EBITDA
$266,452
$177,489
$71,896
$-
$-
$-
Net Income
$157,157
$132,037
$52,032
$-
$-
$-
Net Cash Provided by Operating Activities
$224,663
$61,085
$(105,016)
$-
$-
$-
Purchases of Property, Plant, and
 
Equipment
$-
$-
$-
$-
$-
$-
Net Cash Flow
$224,663
$61,085
$(105,016)
$-
$-
$-
●
Financial model includes 0.9 million tonnes of inferred coal production.
 
Inferred coal represents 0.6% of the total
production, and none of this coal was included in the estimate of reserves.
Consolidated cash flows are driven by annual sales tonnage, which grows from 0.4 million
 
tonnes in
2032 to a peak of 3.8
 
million tonnes in 2060.
 
Between years 2061
 
and 2090, sales ranges from
 
1.5
million to 2.7
 
million tonnes and between
 
years 2091-2100,
 
sales range from
 
0.4 million tonnes
 
to
1.3 million tonnes.
 
Projected consolidated
 
revenue grows
 
from $54.0 million
 
in 2032 to
 
a peak of
$917.7 million in 2060.
 
Revenue totals $37.6 billion for the project’s
 
life.
Consolidated cash flow from operations is positive throughout the projected operating period, with
the
 
exception
 
of post
 
-production
 
years,
 
due to
 
end-of-mine
 
reclamation
 
spending.
 
Consolidated
cash flow from operations
 
peaks at $374.3 million in
 
2061 and totals $9.1 billion over
 
the project’s
life.
 
Capital
 
expenditures
 
total
 
$531.2 million
 
during the
 
first
 
five
 
years
 
and $3.8
 
billion over
 
the
project’s life.
 
1.10.1
Discounted Cash Flow Analysis
Cash flow after
 
tax, but before
 
debt service, generated
 
over the life
 
of the project
 
was discounted
to NPV
 
at a 10.0%
 
discount rate,
 
which represents
 
Coronado’s
 
estimate of
 
the nominal dollar,
 
risk
adjusted
 
weighted
 
average
 
cost
 
of
 
capital
 
(
WACC
)
 
for
 
likely
 
market
 
participants
 
if
 
the
 
subject
reserves were offered for sale.
 
On an un-levered basis,
 
the NPV of
 
the project cash
 
flows represents
the
 
Enterprise
 
Value
 
of
 
the
 
project
 
and
 
amounts
 
to
 
$168.3
 
million.
 
The
 
pre-feasibility
 
financial
model prepared for the
 
TRS was developed to
 
test the economic
 
viability of
 
each coal resource area.
 
The
 
NPV
 
estimate
 
was
 
made
 
for
 
purposes
 
of
 
confirming
 
the
 
economics
 
for
 
classification
 
of
 
coal
reserves and
 
not for
 
purposes of valuing
 
Coronado or
 
its Mon Valley
 
assets.
 
Mine plans were
 
not
optimized,
 
and
 
actual
 
results
 
of
 
the
 
operations
 
may
 
be
 
different,
 
but
 
in
 
all
 
cases,
 
the
 
mine
production plan assumes the properties are under competent management.
1.10.2
Sensitivity Analysis
Sensitivity
 
of the
 
NPV
 
results
 
to
 
changes
 
in
 
the
 
key
 
drivers
 
is presented
 
in the
 
chart below.
 
The
sensitivity study shows
 
the NPV at
 
the 10.0% discount rate
 
when Base Case sales
 
prices, operating
costs, and capital costs are increased and decreased in increments
 
of 5% within a +/- 15% range.
ex964p2i0
 
 
ex964p19i1
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
11
Figure 1-4:
 
Sensitivity of NPV
As shown, NPV is quite sensitive to changes in sales price and operating cost estimates, and slightly
sensitive to changes in capital cost estimates.
1.11
Permitting
Due
 
to
 
the
 
projected
 
start-up
 
date
 
of
 
the
 
Mon
 
Valley
 
mines,
 
initial-stage
 
permit
 
work
 
has
 
been
completed
 
to date;
 
however,
 
no permit
 
applications have
 
been submitted
 
to the
 
state
 
or federal
regulatory agencies.
 
The proposed mines are
 
located in an area with
 
a long history of coal
 
mining,
with
 
numerous
 
permitted
 
operations
 
in
 
close
 
proximity.
 
Coal
 
mining
 
permits
 
are
 
routinely
obtained; a
 
2 to
 
3-year lead
 
time is
 
recommended.
 
Estimated
 
expenditures for
 
mine closure
 
and
site reclamation are included in the financial model for each mine or plant site.
 
MM&A is unaware
of any obvious or
 
current Coronado permitting
 
issues that are expected
 
to prevent the
 
issuance of
future permits.
 
All coal producers are subject to a level of uncertainty regarding future clean water
permits due to
United States
 
Environmental
 
Protection Agency
(
EPA
)
 
and
United States
 
Fish and
Wildlife (
USFW
)
 
involvement with state programs.
1.12
Conclusion and Recommendations
Sufficient
 
data
 
has
 
been
 
obtained
 
through
 
various
 
exploration,
 
sampling
 
programs,
 
and
 
mining
operations
 
to
 
support
 
the
 
geological
 
interpretations
 
of
 
seam
 
structure
 
and
 
thickness
 
for
 
coal
horizons situated
 
on the Property.
 
The data are
 
of sufficient
 
quantity and reliability
 
to reasonably
support the coal-resource and coal-reserve estimates
 
in this TRS.
ex964p2i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
12
The
 
geological
 
data
 
and
 
preliminary
 
feasibility
 
study,
 
which
 
consider
 
mining
 
plans,
 
revenue,
 
and
operating-
 
and
 
capital-cost
 
estimates
 
are
 
sufficient
 
to
 
support
 
the
 
classification
 
of
 
coal
 
reserves
provided herein.
This geologic
 
evaluation conducted
 
in conjunction
 
with the
 
preliminary feasibility
 
study concludes
that
 
the
 
134.4
 
Mt
 
of
 
marketable
 
underground
 
coal
 
reserves
 
identified
 
on
 
the
 
Property
 
are
economically
 
mineable
 
under
 
reasonable
 
expectations
 
of
 
market
 
prices
 
for
 
metallurgical
 
coal
products, estimated operation costs,
 
and capital expenditures.
2
Introduction
2.1
Registrant and Terms
 
of Reference
This report
 
was prepared
 
for
 
the sole
 
use of
Coronado Global
 
Resources
 
Inc. (
Coronado
)
and
 
its
affiliated and
 
subsidiary companies and
 
advisors.
 
An updated TRS
 
was prepared
 
in February 2023
due
 
to
 
material
 
differences
 
in
 
the
 
key
 
financial
 
modifying
 
factors
 
including
 
coal
 
sales
 
price
assumptions, operating costs
 
and capital costs
 
from December 31,
 
2021 to
 
December 31,
 
2022.
 
Coal
sales price
 
assumptions are
 
discussed in
 
Sections 12
 
and 16
 
of the
 
TRS, while
 
operating
 
costs and
capital costs are discussed in
Sections 18 and
 
19
 
of the TRS.
 
The report provides a statement of coal
resources and coal reserves for Coronado, as defined under the
Australasian Code for Reporting of
Exploration
 
Results,
 
Mineral
 
Resources
 
and
 
Ore
 
Reserves
(
JORC
 
Code
)
 
as
 
well
 
as
 
under
 
Subpart
1300
 
of
 
Regulation
 
S-K
 
(Regulation
 
S-K
 
1300)
 
promulgated
 
by
 
the
United
 
States
 
Securities
 
and
Exchange
 
Commission (
SEC
)
.
 
This report
 
was also
 
prepared
 
in accordance
 
with the
Australasian
Code
 
for
 
Public
 
Reporting
 
of
 
Technical
 
Assessments
 
and
 
Valuations
 
of
 
Mineral
 
Assets
(
VALMIN
Code
).
The Mon
 
Valley
 
property is
 
comprised of
 
three separate
 
reserve holdings,
 
namely,
 
the Pangburn,
Shaner and Fallowfield proposed underground mines in the Upper Freeport seam.
The report provides
 
a statement
 
of coal resources
 
and coal reserves for
 
Coronado at the Property.
 
Exploration results and Resource
 
calculations were used as the basis for the mine planning and the
preliminary feasibility study completed to determine
 
the extent and viability of the reserve.
Coal
 
resources
 
and
 
coal
 
reserves
 
are
 
herein
 
reported
 
in
 
metric
 
units
 
of
 
measurement
 
and
 
are
rounded to millions of metric tonnes (
Mt
).
2.2
Information Sources
This TRS
 
is based on
 
information
 
provided by
 
Coronado and reviewed
 
by MM&A.
 
Sources of data
and information are listed below in
Table 2-1
:
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
13
Table 2-1:
 
Information Provided to MM&A by Coronado
 
Category
Information Provided by Coronado
Report Section
Geological
Geologic data including digital databases
 
and original source data including
geologist logs, driller’s logs, geophysical
 
logs
9.1
Coal Quality
Database of coal quality information
 
supplemented with original source
laboratory sheets where available
10.1
Mining
Historical productivities and manpower
 
from operating and future
 
Coronado
mines
13.2, 13.4
Coal Preparation
Flow sheet and other information representing
 
current and future methods of
coal processing
 
14.1
Waste Disposal
Engineering data and estimates representing
 
remaining capacities for coarse
and fine coal waste disposal
17.2
Costs
Historical and budgetary operating
 
cost information used to derive
 
cost drivers
for reserve financial modeling
18.2
Economic
WACC and inflation rate
 
used in discounted cash flow analysis
19.1, 19.2, 19.3
Note: While the sources
 
of data listed
 
in Table
 
2-1 are not
 
exhaustive, they represent
 
a significant portion
 
of information which
 
supports this TRS.
 
MM&A
 
reviewed
 
the
 
provided
 
data
 
and
 
found
 
it
 
to
 
be
 
reasonable
 
prior
 
to
 
incorporating
 
it
 
into
 
the
 
TRS.
 
The
 
TRS
 
contains
 
“forward-looking
information” including
 
forecasts
 
of productivity
 
and annual
 
coal production,
 
operating and
 
capital cost
 
estimates, coals
 
sales price
 
forecasts, the
assumption that
 
Coronado
 
will
 
continue
 
to
 
acquire
 
necessary permits,
 
and
 
other assumptions.
 
The
 
TRS
 
statements
 
and
 
conclusions
 
are
 
not
 
a
guarantee of future performance and undue reliance should not be placed on them.
 
The ability of Coronado to recover the estimated coal reserves
is dependent on multiple factors beyond the
 
control of MM&A including, but not
 
limited to geologic factors, mining conditions, regulatory approvals,
and changes in regulations.
 
In all cases, the plans assume the Property is under competent management.
Coronado engaged MM&A to conduct a coal resource and reserve evaluation
 
of the Coronado coal
properties
 
as
 
of
 
December
 
31,
 
2022,
 
the
 
effective
 
date
 
of
 
this
 
TRS
 
for
 
Mon
 
Valley.
 
For
 
the
evaluation, the following tasks were
 
to be completed:
 
>
Conduct a site visit to the projected resource/reserve area;
>
Process the information supporting the estimation of
 
coal resources and reserves into geological
models;
 
>
Develop life-of-reserve mine
 
(
LOM
) plans and financial models;
>
Hold discussions with Coronado company management; and
 
>
Prepare and issue a TRS providing a statement
 
of coal resources and reserves which would
include:
-
A description of the mines and facilities.
 
-
A description of the evaluation process.
-
An estimation
 
of coal
 
resources and
 
reserves with
 
compliance elements
 
as stated
 
under the
JORC Code and the SEC Regulation S-K 1300.
ex964p2i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
14
2.3
Personal Inspections
MM&A is very familiar
 
with the Mon Valley
 
properties, having provided
 
a variety of geological
 
and
engineering
 
evaluations
 
of
 
the
 
subject
 
property
 
and
 
neighboring
 
properties
 
in
 
recent
 
years.
 
No
facilities are constructed on the properties.
3
Property Description
3.1
Location
The Mon Valley
 
Complex will include the
 
Pangburn, Shaner,
 
and Fallowfield underground
 
mines in
the Upper Freeport coal
 
seam.
 
The properties are located approximately 22.5 kilometers southeast
of Pittsburgh.
 
The
 
property
 
is
 
located
 
in
 
Allegheny,
 
Washington,
 
and
 
Westmoreland
 
Counties,
 
Pennsylvania.
 
Mining operations
 
here have
 
not yet
 
been initiated.
 
The Property
 
is located
 
on portions
 
of eight
United
 
States
 
Geological
 
Survey
(
USGS
)
 
quadrangles:
 
Irwin;
 
Glassport;
 
Monongahela;
 
Donora;
Smithton; California; Ellsworth; and Hackett.
 
The coordinate system and datum used for the model
of
 
Mon
 
Valley
 
and
 
the
 
subsequent
 
maps
 
were
 
produced
 
in
 
the
 
Pennsylvania
 
State
 
Plane
 
South
system, NAD 27.
3.2
Titles, Claims or Leases
The
 
property
 
is
 
composed
 
of
 
41,615
 
total
 
hectares,
 
of
 
which
 
1,339
 
are
 
leased
 
from
 
private
landholders under two leases, and 40,276 hectares are owned by Coronado.
 
Subject to Coronado’s
exercising
 
its renewal rights
 
thereunder,
 
both of the leases expire
 
upon exhaustion of the
 
relevant
coal
 
reserves,
 
which
 
is
 
expected
 
to
 
occur
 
in
 
2100.
 
MM&A
 
has
 
not
 
carried
 
out
 
a
 
separate
 
title
verification
 
for
 
the coal
 
properties
 
and has
 
not verified
 
leases, deeds,
 
surveys, or
 
other property-
control
 
instruments
 
pertinent
 
to
 
the
 
subject
 
resources.
 
Tenure
 
was
 
separately
 
reviewed
 
by
Coronado’s
 
legal advisors.
 
Coronado has
 
represented
 
to MM&A
 
that it
 
controls the
 
mining rights
to the reserves as shown on
 
its property maps, and MM&A has accepted
 
these as being a true and
accurate
 
depiction of
 
the mineral
 
rights controlled
 
by Coronado.
 
The TRS
 
assumes the
 
properties
are developed under responsible and experienced management.
 
3.3
Mineral Rights
Coronado supplied property control maps to MM&A related to properties for which mineral and/or
surface
 
property
 
are
 
controlled
 
by
 
Coronado.
 
While
 
MM&A
 
accepted
 
these
 
representations
 
as
being
 
true
 
and
 
accurate,
 
MM&A
 
has
 
no
 
knowledge
 
of
 
past
 
property
 
boundary disputes
 
or
 
other
concerns, through
 
past knowledge
 
of the
 
Property,
 
that would
 
signal concern
 
over future
 
mining
operations or development potential.
ex964p2i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
15
Property control
 
in Appalachia can
 
be intricate.
 
Coal-mining properties
 
are typically
 
composed of
numerous property
 
tracts which
 
are owned
 
and/or leased
 
from both
 
land-holding companies
 
and
private
 
individuals
 
or
 
companies.
 
It
 
is
 
common
 
to
 
encounter
 
severed
 
ownership,
 
with
 
different
entities
 
or individuals
 
controlling
 
the
 
surface
 
and mineral
 
rights.
 
Mineral
 
control
 
in the
 
region
 
is
typically characterized by leases or ownership of larger tracts of land,
 
with surface control generally
comprised of smaller tracts, particularly in developed areas.
Legal mining rights may reflect a combination of fee or
 
mineral ownership and fee or mineral leases
of coal lands through various surface and mineral lease agreements.
 
Control
 
of
 
the
 
surface
 
property
 
is
 
necessary
 
to
 
conduct
 
surface
 
mining
 
but
 
is
 
not
 
necessary
 
to
conduct underground mining.
 
Given that the vicinity of the Mon Valley properties has an extensive
history
 
of
 
coal
 
mining,
 
Coronado
 
and
 
its
 
predecessors
 
have
 
a
 
successful
 
history
 
of
 
obtaining
 
any
necessary rights and the associated permits to mine.
3.4
Encumbrances
No Title Encumbrances are known.
 
By assignment, MM&A did
 
not complete a query
 
related to Title
Encumbrances.
 
3.5
Other Risks
There is always risk
 
involved in property control.
 
Coronado and its predecessor, CONSOL, have both
had their legal teams examine the deeds and title control in order to
 
minimize the risk.
 
4
Accessibility, Climate, Local Resources,
Infrastructure and Physiography
4.1
Topography,
 
Elevation and Vegetation
Topography
 
of the
 
area surrounding
 
the proposed
 
Mon Valley
 
complex is
 
typical of
 
the Northern
Appalachian
 
Plateau
 
consisting
 
of
 
broad
 
river
 
valleys
 
and
 
rolling
 
hills,
 
with
 
some
 
upland
 
regions.
 
Surface
 
elevations
 
near
 
the
 
Property
 
range
 
from
 
approximately
 
396
 
meters
 
above
 
sea
 
level
 
in
upland regions to approximately 220 meters at stream level.
 
The property is moderately vegetated
by primarily oak
 
hardwood forests, but the
 
majority of
 
the land
 
is developed
 
for farm and
 
residential
use.
 
The
 
property
 
is
 
situated
 
near
 
the
 
major
 
urban
 
center
 
of
 
Pittsburgh,
 
PA
 
and
 
is
 
considered
suburban.
 
ex964p2i0
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
16
4.2
Access and Transport
There
 
is
 
general
 
access
 
to
 
the
 
Mon
 
Valley
 
property
 
via
 
a
 
well-developed
 
network
 
of
 
primary,
secondary,
 
and
 
unimproved
 
roads.
 
The
 
Monongahela
 
and
 
Youghiogheny
 
Rivers
 
traverse
 
the
Property from
 
south to north.
 
There are
 
numerous four
 
-lane limited-access
 
roads situated
 
within
or adjacent to the Property as well as a network of improved two-lane state and county roads.
 
U.S.
Interstate
 
70
 
and
 
Pennsylvania
 
Route
 
51
 
traverse
 
the
 
Fallowfield
 
and
 
Pangburn
 
properties,
respectively.
 
Numerous
 
secondary
 
and
 
unimproved
 
roads
 
provide
 
direct
 
access
 
to
 
the
 
mine
property, some being state
 
-
 
and town-
 
maintained.
 
These roads typically stay open throughout the
year.
 
There
 
are
 
numerous
 
transportation/logistical
 
options
 
for
 
shipping
 
product.
 
The
 
primary
means
 
of
 
transport
 
for
 
produced
 
coal
 
would
 
be
 
by
 
barge
 
on
 
the
 
Monongahela
 
River/Ohio
 
River
system.
 
Additionally,
 
a
 
CSX
 
rail
 
line
 
located
 
along
 
the
 
banks
 
of
 
the
 
Monongahela
 
River
 
would
provide another option for the shipment of coal.
4.3
Proximity to Population Centers
 
The
 
Mon
 
Valley
 
property
 
lies
 
near
 
the
 
communities
 
of
 
Bentleyville,
 
Lockview,
 
Monongahela,
Elizabeth,
 
Sutersville,
 
and
 
Irwin,
 
Pennsylvania
 
approximately
 
16
 
kilometers
 
to
 
32
 
kilometers
southeast
 
of
 
Pittsburgh,
 
and
 
16
 
kilometers
 
to
 
32
 
kilometers
 
from
 
Washington
 
and
 
McKeesport,
Pennsylvania.
 
As of the
 
2020 census Pittsburgh had
 
a population of
 
302,971 residents; McKeesport,
18,825; and Washington, 13,176.
 
4.4
Climate and Length of Operating Season
The climate of
 
the region
 
is classified
 
as warm-summer
 
humid continental with
 
four distinct seasons:
 
warm summers,
 
cold winters,
 
and moderate
 
fall and
 
spring seasons.
 
Precipitation in
 
the region
 
is
consistent throughout the year with the most
 
rain falling in spring and
 
the early months of
 
summer.
 
Average
 
yearly rainfall
 
is 53.1 centimeters.
 
Summer months typically begin
 
in late May
 
and end in
early September
 
and range
 
in average
 
temperature
 
from 51
 
to 84
 
degrees Fahrenheit
 
(or 10.6
 
to
28.9
 
degrees
 
Celsius).
 
Winters
 
typically
 
begin
 
in mid
 
to
 
late
 
November
 
and
 
run
 
until
 
mid to
 
late
March with average temperatures
 
ranging from 22 to 50 degrees Fahrenheit
 
(or -5.6 to 10 degrees
Celsius).
 
Precipitation in the winter
 
typically comes in
 
the form of snowfall
 
or as a
 
wintery mix (sleet
and
 
snow)
 
with
 
severe
 
snowfall
 
events
 
occurring
 
occasionally.
 
Seasonal
 
variations
 
in
 
climate
typically
 
do
 
not
 
affect
 
underground
 
mining
 
in
 
Pennsylvania.
 
However,
 
weather
 
events
 
could
potentially
 
negatively
 
impact
 
efficiency
 
of
 
surface
 
and
 
preparation
 
plant
 
operations
 
on
 
a
 
very
limited basis, typically lasting less than a few days.
4.5
Infrastructure
The Mon Valley property has sources
 
of water,
 
power,
 
personnel, and supplies readily available for
use.
 
Personnel
 
have
 
historically
 
been
 
sourced
 
from
 
the
 
surrounding
 
communities
 
in
 
Allegheny,
Washington, and
 
Westmoreland Counties, and have
 
proven to be adequate
 
in numbers to operate
the mines.
 
As mining is common in the
 
surrounding areas, the workforce
 
is generally familiar
 
with
mining practices, and
 
many are experienced
 
miners.
 
Water is
 
expected to be
 
sourced locally from
nearby public
 
water sources or
 
rivers.
 
Electricity is
 
anticipated to be
 
sourced from
West Penn Power
(
West Penn
)
 
or
Duquesne Light
(
Duquesne Light
)
.
 
The service industry
 
in the areas
 
surrounding the
ex964p2i0
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
17
proposed mine
 
complex has historically
 
provided supplies, equipment
 
repairs and
 
fabrication, etc.
 
Barge
 
transport
 
on
 
the
 
Monongahela
 
River/Ohio
 
River
 
system
 
will
 
serve
 
as
 
the
 
main
 
means
 
of
product
 
transport
 
from
 
the
 
mine,
 
and
 
currently
 
serve
 
as
 
a
 
means
 
of
 
coal
 
transportation
 
for
neighboring
 
Pittsburgh
 
seam
 
operations.
 
Rail access
 
is
 
provided
 
by
 
a
 
CSX
 
Corporation
 
(
CSX
)
 
rail
line.
 
5
History
5.1
Previous Operation
The
 
property
 
was
 
formerly
 
controlled
 
by
Consolidation
 
Coal
 
Company
(
CONSOL
).
 
Historic
underground
 
operations
 
were
 
active
 
in
 
the
 
area
 
in
 
the
 
early
 
1900’s
 
and
 
contour
 
surface
 
mining
operations
 
were
 
performed
 
in
 
the
 
1950
 
to
 
1960
 
era.
 
Coronado
 
acquired
 
the
 
properties
 
from
CONSOL in March 2016.
5.2
Previous Exploration
The
 
properties
 
have
 
been
 
extensively
 
explored
 
by
 
subsurface
 
drilling
 
efforts
 
carried
 
out
 
by
numerous entities,
 
most of which
 
were completed
 
prior to acquisition
 
by Coronado.
 
The majority
of the drilling was accomplished
 
using vertical continuous (diamond) coring and air
 
rotary methods.
Drill records
 
indicate that
 
independent contract
 
drilling operators
 
have been
 
engaged periodically
to carry out
 
exploration drilling on
 
the properties.
 
Geophysical logging on
 
those properties acquired
from CONSOL was often performed by
 
both CONSOL’s in-house logging services and outside logging
firms.
 
6
Geological Setting, Mineralization and Deposit
6.1
Regional, Local and Property Geology
The property lies in the Northern Appalachian
 
Coal basin in the Appalachian Plateau
 
physiographic
province.
 
The coal deposits in the eastern USA are the oldest and most extensively
 
developed coal
deposits in the country.
 
The coal deposits on the properties are
 
Carboniferous in age, being of
 
the
Pennsylvanian
 
system.
 
Overall,
 
these
 
Carboniferous
 
coals
 
contain
 
roughly
 
two-fifths
 
of
 
the
bituminous
 
coal
 
deposits
 
in
 
the
 
United
 
States
 
and
 
extend
 
over
 
1,448
 
kilometers
 
from
 
northern
Alabama to Pennsylvania and are part of what is known as the
Appalachian Basin
.
 
The Appalachian
Basin
 
is
 
more
 
than
 
402
 
kilometers
 
wide
 
and,
 
in
 
some
 
portions,
 
contains
 
over
 
60
 
coal
 
seams
 
of
varying economic significance.
ex964p26i0
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
18
Seams of economic significance typically range between 0.3 meters to 1.8 meters in thickness, with
relatively
 
little
 
structural
 
deformation.
 
Regional
 
structure
 
is
 
typically
 
characterized
 
by
 
gently
dipping strata to the northwest
 
at less than one percent.
Seams of the Allegheny Formation have historically been mined in the Pennsylvania region with the
Upper
 
Freeport
 
seam being
 
one of
 
the principal
 
seams in
 
the formation.
 
Coal from
 
the area
 
has
historically sold in thermal and metallurgical markets.
Future
 
operations
 
at the
 
Mon Valley
 
properties will
 
extract
 
the Upper
 
Freeport coal
 
seam, which
covers large areas of Pennsylvania, Ohio, Maryland, and West Virginia.
 
The Upper Freeport seam is
situated
 
at
 
the
 
top
 
of
 
the
 
Allegheny
 
Group
 
of
 
the
 
middle
 
Pennsylvanian
 
period
 
(307-315
 
million
years ago).
 
The top of the Upper Freeport
 
seam is commonly used as the marker
 
between the top
of
 
the
 
Allegheny
 
Formation
 
and
 
the
 
overlying
 
Upper
 
Pennsylvanian
 
Conemaugh
 
Group.
 
The
Allegheny Formation is made up of laminated cyclothemic sequences of coal, shale, limestone, and
clay.
 
The
 
Upper
 
Freeport
 
seam
 
lies
 
generally
 
around
 
183
 
meters
 
below
 
the
 
Pittsburgh
 
seam.
 
Deposits associated with the Upper Freeport are often irregular and dislocated deposits (formed
 
in
domed peat swamps commonly referred
 
to as “peat islands”).
 
The
 
primary
 
structural
 
controls
 
on
 
the
 
Upper
 
Freeport
 
coal
 
basin
 
are
 
localized
 
syn-depositional
anticlines
 
and
 
synclines
 
that
 
directly
 
influence
 
the
 
accumulation
 
of
 
peat
 
bogs.
 
These
 
structures
create
 
gently
 
folded
 
and
 
rolling
 
coal
 
strata.
 
The
 
axis
 
of
 
the
 
Waynesburg
 
and
 
Port
 
Royal
 
(Irwin)
synclines pass through the center and eastern portions of the properties with a trend and incline to
the Northeast.
 
The Amity, Murrysville, and Belle Vernon
 
anticlines (listed from west to east) reside
to the
 
center and western
 
portions of the
 
properties.
 
These anticlines
 
often coincide
 
with thicker
coal seams where peat accumulated
 
in domes along the anticlinal crest.
 
It is understood that local
anticlines
 
represent
 
the upthrown
 
side of
 
syn-depositionally
 
active
 
deep
 
faults.
 
Inversely,
 
fluvial
channel sediments were deposited on the structural downthrown
 
side within synclines.
 
Within the Pangburn,
 
Shaner,
 
and Fallowfield mine-plan
 
areas, the Upper
 
Freeport is typically
 
183
meters to
 
335 meters below
 
the ground surface.
 
Mine access is therefore
 
to be provided
 
by shaft
and slope development.
 
The planned Pangburn shaft depth is
 
approximately 195 meters
 
in depth.
 
The
 
shaft
 
depths
 
at
 
the
 
projected
 
locations
 
for
 
the
 
Shaner
 
and
 
Fallowfield
 
shafts
 
range
 
from
approximately 232 meters to
 
268 meters.
 
6.2
Mineralization
The coal to be produced at The Mon Valley
 
Complex is typically high volatile (>31% volatile matter)
bituminous coal.
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex964p27i4
 
 
 
 
 
ex964p27i1
 
 
 
 
 
 
 
 
 
 
 
ex964p27i4
 
 
 
 
 
 
 
 
 
 
 
ex964p27i1
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex964p27i6
 
 
 
 
 
 
ex964p27i5 ex964p27i5
 
 
ex964p27i5 ex964p27i2
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex964p27i5
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex964p27i5 ex964p27i5
 
ex964p27i0 ex964p27i5
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex964p27i7 ex964p27i8
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
19
RM
Redstone
 
Limestone
RML
Lower Redstone Limestone
PSU
Pittsburgh SS Upper Bench
PR
Pittsburgh
 
Rider Coal
PSL
Pittsburgh SS Lower Bench
RCZ
Pittsburgh Roof Coal Zone
DS
Drawslate
PG
Pittsburgh Coal Main Bench
PGS
Pittsburgh Coal Expected
 
Horizon (Surface)
AM
Ames Marine Zone
AMS
Ames Marine Zone
 
Expected
 
Horizon (Surface)
HR
Harlem Coal
BK2
Upper Bakerstown Coal
WRM
Woods
 
Run Marine Zone
BK1
Lower Bakerstown Coal
PC
Pine Creek Marine Zone
BCM
Brush Creek Marine Zone
BC
Brush Creek Coal
BCS
Brush Creek Coal Expected
 
Horizon (Surface)
MHU
Upper Mahoning
 
Sandstone
MA
Mahoning
 
Coal
MH
Lower Mahoning
 
Sandstone
UFR
Upper Freeport Rider Coal
UF
Upper Freeport
 
Coal
UFS
Upper Freeport
 
Coal Expected Horizon
 
(Surface)
UFL
Upper Freeport Leader Coal
LUF
Upper Freeport Limestone
BUT
Butler
 
Sandstone
LFR
Lower Freeport Rider Coal
LF
Lower Freeport
 
Coal
LFL
Lower Freeport Leader Coal
LLF
Lower Freeport Limestone
FSS
Freeport Sandstone
REQUIRED
 
UNIT
Age
Group
Formation
Member
Code
Pennsylvanian
Monongahela
Pittsburgh
Lower
Major Units
Mahoning
Pennsylvanian
Conemaugh
Glenshaw
Ames
Saltsburg
Woods
 
Run
Pine Creek
Brush Creek
Pennsylvanian
Allegheny
Freeport
The generalized stratigraphic
 
columnar section in
Figure 6-1
 
demonstrates the vertical
 
relationship
of the principal coal seams and rock formations on the Property.
Figure 6-1:
 
Stratigraphic Column
(not to scale)
ex964p2i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
20
6.3
Deposits
Historic
 
underground
 
mining
 
has
 
occurred
 
in
 
the
 
overlying
 
Pittsburgh
 
Seam
 
on
 
this
 
property.
 
Contour
 
surface
 
mining
 
on
 
the
 
Pittsburgh
 
and
 
Redstone
 
outcrop
 
has
 
occurred
 
within
 
the
 
areas
projected
 
for
 
the coal
 
refuse
 
disposal area,
 
the slope
 
portal
 
area and
 
the preparation
 
plant
 
area.
 
The three
 
proposed mines
 
(Pangburn, Shaner,
 
and Fallowfield)
 
are all
 
projected to
 
be deep mines
in the Upper
 
Freeport seam.
 
Mining is projected
 
in areas where
 
the total seam
 
thickness exceeds
1.2 meters.
 
Areas of
 
sandstone washout
 
and seam thinning
 
have been
 
excluded from
 
projections
by MM&A personnel.
 
Additional exploration could identify additional geologically
 
limiting features,
which could alter the proposed mine plan.
 
The Upper Freeport seam in the projected areas ranges
from 0.7 meters to 3.1 meters
 
thick and averages 1.95 meters thick.
7
Exploration
7.1
Nature and Extent of Exploration
Extensive exploration in the form of subsurface drill efforts has been carried out on the Property by
numerous
 
entities,
 
most
 
of
 
which
 
efforts
 
were
 
completed
 
prior
 
to
 
the
 
acquisition
 
by
 
Coronado.
 
Diamond
 
core
 
and
 
rotary
 
drilling
 
are
 
the
 
primary types
 
of exploration
 
on the
 
Property.
 
Data
 
for
correlation
 
and mining
 
conditions
 
are
 
derived
 
from
 
core
 
descriptions
 
and geophysical
 
logging (e-
logging).
 
Coal quality analyses were also
 
employed during the core
 
exploration process.
 
A total of
approximately 750 core and rotary
 
holes have been drilled for exploration.
The location of the drilling is shown on the maps included in
Appendix B
.
The
 
concentration
 
of
 
exploration
 
varies
 
slightly
 
across
 
the
 
Property.
 
Drilling
 
on
 
the
 
Property
 
is
typically
 
sufficient
 
for
 
delineation
 
of
 
potential
 
underground
 
mineable
 
benches.
 
Core
 
logging
 
is
carried out by professional
 
geologists in cases where
 
roof and floor strata
 
are of particular interest
and in cases
 
where greater resolution and
 
geologic detail are
 
needed.
 
Generally speaking, however,
most drill
 
hole data
 
come from
 
simplified driller’s
 
logs, which
 
often lack
 
specific details
 
regarding
geotechnical
 
conditions
 
and
 
specific
 
geology,
 
making
 
correlations
 
and
 
floor
 
and
 
roof
 
conditions
difficult to
 
determine.
 
Geophysical logging
 
(e-logging) techniques,
 
by contrast,
 
document specific
details
 
useful
 
for
 
geologic
 
interpretation
 
and
 
mining
 
conditions.
 
Given
 
the
 
variability
 
of
 
data-
gathering
 
methods,
definitive
 
mapping
 
of
 
future
 
mining
 
conditions
 
may
 
not
 
be
 
possible,
 
but
projections and assumptions can be made within a
reasonable
 
degree of certainty.
A significant effort
 
was put into
 
verifying the integrity
 
of the database.
 
Once this was established,
stratigraphic
 
columnar
 
sections
 
were
 
generated
 
using
 
cross-sectional
 
analysis
 
to
 
establish
 
or
confirm coal seam correlations.
 
A typical cross-section is shown in
Figure 7-1
.
ex964p2i0
 
 
ex964p29i0
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
21
Figure 7-1:
 
Mon Valley Cross-Section
Due to
 
the long history
 
of exploration
 
by various
 
parties on the
 
Property,
 
a wide
 
variety of
 
survey
techniques exist for
 
documentation of data
 
point locations.
 
Many of
 
the older
 
exploration drill holes
appear to
 
have been
 
located by
 
survey and
 
more recently-completed
 
drill holes
 
are often
 
located
by high-resolution Global
 
Positioning System (
GPS
) units.
 
However, some holes appear
 
to have been
approximately
 
located
 
using
 
USGS
 
topography
 
maps
 
or
 
other
 
methods
 
which
 
are
 
less
 
accurate.
 
Therefore,
 
discretion
 
had
 
to
 
be
 
used
 
regarding
 
the
 
accuracy
 
for
 
the
 
location
 
and
 
ground
 
surface
elevation of
 
some of these
 
older drill holes.
 
In instances
 
where a drill
 
hole location
 
(or associated
coal
 
seam
 
elevations)
 
appeared
 
to
 
be
 
inconsistent
 
with
 
the
 
overall
 
structural
 
trend
 
(or
 
surface
topography
 
for surface
 
-mineable areas),
 
the data
 
point was
 
not honored
 
for
 
geological modeling.
 
Others with apparently minor variances were adjusted
 
and then used by MM&A.
 
Surveying of the underground and surface mined areas has been performed by the mine operators
and/or
 
their
 
consulting
 
surveyors.
 
By
 
assignment,
 
MM&A
 
did
 
not
 
verify
 
the
 
accuracy
 
or
completeness of supplied
 
mine maps but
 
accepted this information as
 
being the
 
work of responsible
engineers and surveyors.
MM&A
 
compiled
 
comprehensive
 
topographic
 
map
 
files
 
by
 
selecting
 
the
 
best
 
available
 
aerial
mapping for each area and filling any gaps with digital USGS topographic
 
mapping.
7.2
Non-Drilling Procedures and Parameters
All pertinent data used to characterize the
 
coal resources and coal reserves have been acquired via
exploration-based drilling methods.
 
The region has historically produced and sold Upper Freeport-
based coal
 
into metallurgical
 
and thermal
 
markets, enhancing
 
the confidence
 
of the
 
marketability
and quality of the resource.
 
7.3
Drilling Procedures
Core drilling methods
 
utilize NX-size (~5.4 centimeter) or similar-sized core cylinders
 
to recover core
samples, which
 
can
 
be used
 
to
 
delineate
 
geologic characteristics,
 
for
 
coal-quality
 
testing,
 
and for
ex964p2i0
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
22
geotechnical
 
logging.
 
With core
 
holes, geophysical
 
logs are
 
especially useful
 
in verifying
 
the core
recovery of both the coal samples (for assurance that the sample is representative of the full seam)
and
 
of
 
the
 
roof
 
and
 
floor
 
rock
 
samples
 
(for
 
evaluating
 
ground
 
control
 
characteristics
 
of
 
deep
mineable coal
 
seams).
 
In addition
 
to the
 
core holes,
 
rotary-drilled holes
 
also exist
 
on most
 
of the
Property.
 
Data
 
for
 
the
 
rotary-drilled
 
holes
 
are
 
mainly
 
derived
 
from
 
downhole
 
geophysical
 
logs,
which are
 
used to
 
interpret coal
 
and rock thickness
 
and depth,
 
since logging of
 
the drill cuttings
 
is
unreliable.
 
Exploratory drilling generally requires drilling to depths of
 
over 152 meters to penetrate
the target coal seam at Mon Valley
 
.
A wide variety
 
of core-logging techniques
 
exist for
 
the properties.
 
For many of
 
the core holes, the
primary data
 
source is a
 
generalized
 
lithology description by
 
the driller,
 
typically supplemented
 
by
a more detailed
 
core log completed
 
by a geologist.
 
These drilling logs were
 
provided to MM&A
 
as
a geological database.
 
MM&A geologists were
 
not involved
 
in the production
 
of original core
 
logs
but did perform a
 
basic check of information within
 
the provided database.
 
Where geophysical logs
for such holes were available,
 
they were used by MM&A geologists to
 
verify the coal thickness and
core recovery of seams.
 
7.4
Hydrology
Based on
 
historical successful
 
production of
 
Upper Freeport,
 
and stratigraphically
 
proximal
 
seams
in the
 
region, the Mon
 
Valley Complex is not
 
expected to have hydrologic concerns
 
of material issue.
 
Future
 
mining
 
is projected
 
to
 
occur
 
in areas
 
exhibiting
 
similar hydrogeological
 
conditions
 
as
 
past
mining,
 
including
 
stream
 
undermining
 
and
 
undermining
 
of
 
aquifers.
 
Based
 
upon
 
the
 
successful
history of
 
mining in the
 
region with
 
regards to
 
hydrogeological
 
features, MM&A
 
assumes that
 
the
operations will not be hindered by such issues.
The Pittsburgh seam has
 
been mined extensively above
 
the Upper Freeport seam on
 
the Property.
 
The
 
interval
 
(approximately
 
183
 
meters)
 
between
 
the
 
seams
 
is
 
anticipated
 
to
 
be
 
adequate
 
to
minimize inflow of water to the planned operations
 
from the overlying Pittsburgh works.
7.5
Geotechnical Data
Mining
 
plans
 
for
 
potential
 
underground
 
mines
 
were
 
developed
 
by
 
Coronado
 
and
 
modified
 
by
MM&A to
 
fit current
 
property constraints.
 
Pillar stability
 
was tested
 
by MM&A
 
using the
Analysis
of
 
Coal
 
Pillar
 
Stability
 
(ACPS)
 
program
 
that
 
was
 
developed
 
by
 
the
National
 
Institute
 
for
Occupational Safety and Health (
NIOSH
)
.
 
MM&A reviewed the results from the ACPS analysis and
considered them in the development of the LOM plan.
ex964p2i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
23
8
Sample Preparation, Analyses and Security
8.1
Prior to Sending to the Lab
Most
 
of the
 
coal
 
samples have
 
been obtained
 
from
 
the Property
 
by subsurface
 
exploration
 
using
core drilling
 
techniques.
 
The protocol
 
for preparing
 
and testing
 
the samples
 
has varied
 
over time
and is
 
not well
 
documented for the
 
older holes
 
drilled on
 
the Property.
 
Typical core-drilling sampling
methods for
 
coal in
 
the United
 
States
 
involves
 
drilling through
 
the seam,
 
removing the
 
core from
the
 
barrel,
 
describing the
 
lithology,
 
wrapping
 
the
 
sample in
 
a
 
sealed
 
plastic
 
sleeve
 
and
 
placing it
lengthwise into
 
a covered core
 
box, and carefully
 
marking hole ID and depth
 
intervals on each box
and
 
lid, allowing
 
the
 
core
 
to
 
be delivered
 
to
 
a
 
laboratory
 
in correct
 
stratigraphic
 
order,
 
and with
original
 
moisture
 
content.
 
This
 
process
 
has
 
been
 
the
 
norm
 
for
 
both
 
historical
 
and
 
ongoing
exploration activities at the Property.
This
 
work
 
is
 
typically
 
performed
 
by
 
the
 
supervising
 
driller,
 
geologist,
 
or
 
company
 
personnel.
 
Samples
 
are
 
most
 
often
 
delivered
 
to
 
the
 
company
 
by
 
the
 
driller
 
after
 
each
 
shift
 
or
 
acquired
 
by
company personnel
 
or representatives.
 
Most of the
 
coal core
 
samples were obtained
 
by previous
or
 
current
 
operators
 
on the
 
Property.
 
MM&A did
 
not participate
 
in the
 
collection,
 
sampling and
analysis of the core samples.
 
However,
 
it is reasonable to assume, given the consistency
 
of quality
from previous operators, that these samples
 
were generally collected and processed under
 
industry
best practices.
 
This assumption is based on MM&A’s
 
familiarity with the operating companies
 
and
the companies used to perform the analyses.
 
8.2
Lab Procedures
Coal quality
 
testing has
 
been performed
 
over many
 
years
 
by operating
 
companies using
 
different
laboratories and testing regimens.
 
Some of the
 
samples have raw analyses and
 
washabilities on the
full seam (with coal and rock parting layers co-mingled) and are mainly useful for characterizing the
coal quality for projected production from underground
 
mining.
 
Other samples have coal and rock
analyzed
 
separately,
 
the
 
results
 
of
 
which
 
can
 
be
 
manipulated
 
to
 
forecast
 
either
 
surface
 
or
underground mining quality.
 
Care has been
 
taken to use only
 
those analyses
 
that are representative
of
 
the
 
coal
 
quality
 
parameters
 
for
 
the
 
appropriate
 
mining
 
type
 
for
 
each
 
sample.
 
Unlike
 
many
Appalachian
 
properties,
 
Mon
 
Valley
 
only
 
has
 
interest
 
in
 
one
 
deep
 
seam;
 
therefore,
 
the
 
analyses
have likely been completed following
 
a consistent protocol.
Standard procedure
 
upon receipt of
 
core samples by the
 
testing laboratory
 
is to log the
 
depth and
thickness
 
of
 
the
 
sample,
 
then
 
perform
 
testing
 
as
 
specified
 
by
 
a
 
representative
 
of
 
the
 
operating
company.
 
Each
 
sample
 
is
 
then
 
analyzed
 
in
 
accordance
 
with
 
procedures
 
defined
 
under
ASTM
International (
ASTM
)
 
standards including, but not
 
limited to; washability (ASTM D4371);
 
ash (ASTM
D3174);
 
sulfur
 
(ASTM
 
D4239);
 
Btu/lb.
 
(ASTM
 
D5865);
 
volatile
 
matter
 
(ASTM
 
D3175);
 
Free
 
Swell
Index (
FSI
) (ASTM D720).
ex964p2i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
24
9
Data Verification
9.1
Procedures of Qualified Person
MM&A reviewed the digital geologic
 
database supplied by Coronado.
 
The database consists of
 
data
records, which
 
include drill hole
 
information for
 
holes that
 
lie within and
 
adjacent to
 
the Property
and records
 
for numerous
 
supplemental coal
 
seam thickness measurements.
 
Upon completion of
the database
 
verification,
 
copies of
 
each entry
 
were
 
printed,
 
and cross
 
referenced
 
to the
 
original
document for
 
verification.
 
Once the initial
 
integrity of the
 
database was
 
established, stratigraphic
columnar sections were
 
generated using
 
cross-sectional analysis to
 
establish or confirm
 
coal-seam
correlations.
 
Geophysical
 
logs
 
were
 
used
 
wherever
 
available
 
to
 
assist
 
in
 
confirming
 
the
 
seam
correlation and to verify proper seam thickness measurements and recovery
 
of coal samples.
 
After establishing and/or verifying proper seam correlation, seam data control maps and geological
cross-sections were generated
 
and again used to verify seam correlations and data
 
integrity.
 
Once
the database was fully vetted, seam thickness, base-of-seam elevation, roof and
 
floor lithology, and
overburden maps were independently generated
 
for use in the mine planning process.
9.2
Limitations
As with any exploration program, localized anomalies
 
cannot always be discovered.
 
The greater the
density of
 
the samples
 
taken,
 
the less
 
the risk.
 
Once an
 
area is
 
identified as
 
being of
 
interest
 
for
inclusion
 
in
 
the
 
mine
 
plan,
 
additional
 
samples
 
are
 
taken
 
to
 
help
 
reduce
 
the
 
risk
 
in
 
those
 
specific
areas.
 
In general, provision is made in the mine planning portion of the study to allow for localized
anomalies that are typically classed more as a nuisance than a hinderance.
 
9.3
Opinion of Qualified Person
Sufficient data
 
has been obtained
 
through various
 
exploration
 
and sampling programs
 
and mining
operations
 
to
 
support
 
the
 
geological
 
interpretations
 
of
 
seam
 
structure
 
and
 
thickness
 
for
 
coal
horizons
 
situated
 
on the
 
Property.
 
The data
 
is of
 
sufficient
 
quantity
 
and reliability
 
to
 
reasonably
support the coal resource and coal reserve estimates in this TRS.
ex964p2i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
25
10
Mineral Processing and Metallurgical Testing
10.1
Testing
 
Procedures
Separate
 
tabulations
 
have
 
been
 
compiled
 
for
 
basic
 
chemical
 
analyses
 
(both
 
raw
 
and
 
washed
quality), petrographic data, rheological data
 
and chlorine, ash, ultimate and sulfur analysis.
 
Available coal quality data was tabulated by resource area in a Microsoft® EXCEL workbook and the
details of that work are maintained on file at
 
the offices of Coronado and MM&A.
 
These tables also
provide
 
basic
 
statistical
 
analyses
 
of the
 
coal quality
 
data
 
sets,
 
including average
 
value;
 
maximum
and minimum values; and the number of
 
samples available to represent
 
each quality parameter of
the seam.
 
Coal samples that
 
were deemed
 
by MM&A geologists
 
to be unrepresentative
 
were not
used
 
for
 
statistical
 
analysis
 
of
 
coal
 
quality,
 
as
 
documented
 
in
 
the
 
tabulations.
 
A
 
representative
group of drill hole
 
samples from the Property
 
were then checked against the original
 
drill laboratory
reports to verify accuracy and correctness.
The amount and areal extent of coal sampling
 
for geological data is generally sufficient to represent
the quality characteristics of
 
the coal horizons
 
and allow for
 
proper market placement of
 
the subject
coal seams.
 
For some of
 
the coal deposits
 
there are considerable laboratory data
 
from core samples
that
 
are representative
 
of full
 
extent
 
of the
 
resource
 
area;
 
and for
 
others
 
there are
 
more
 
limited
data
 
to
 
represent
 
the
 
resource
 
area.
 
For
 
example,
 
in
 
the
 
active
 
operations
 
with
 
considerable
previous
 
mining, there
 
may
 
be limited
 
quality data
 
within some
 
of the
 
remaining resource
 
areas;
however,
 
in those
 
cases the
 
core sampling
 
data can
 
be supplemented
 
with operational
 
data from
mining and shipped quality samples representative of the resource area.
10.2
Relationship of Tests
 
to the Whole
The extensive
 
sampling and
 
testing procedures
 
typically followed
 
in the
 
coal
 
industry result
 
in an
excellent
 
correlation
 
between
 
samples and
 
marketable
 
product.
 
The Upper
 
Freeport
 
seam has
 
a
long
 
history
 
of
 
saleable
 
production
 
in
 
the
 
high-volatile
 
metallurgical
 
and
 
thermal
 
markets,
consistent
 
with
 
exploration
 
results.
 
Degradation
 
of
 
coking
 
coal
 
characteristics
 
over
 
time
 
is
 
not
anticipated to be an issue.
10.3
Lab Information
Each sample
 
is analyzed
 
at area
 
Laboratories
 
that operate
 
in accordance
 
with procedures
 
defined
under ASTM standards including, but not limited to; washability (ASTM D4371); ash (ASTM D3174);
sulfur (ASTM
 
D4239); Btu/lb.
 
(ASTM D5865);
 
volatile matter
 
(ASTM D3175);
 
Free Swell
 
Index (
FSI
)
(ASTM D720).
ex964p2i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
26
10.4
Relevant Results
No critical factors have been found
 
that would adversely affect the recovery
 
of the Reserve.
11
Mineral Resource Estimates
MM&A independently created
 
a geologic model to define
 
the coal resources at
 
the Property.
 
Coal
resources were estimated
 
as of December 31, 2022.
11.1
Assumptions, Parameters and Methodology
Geological
 
data
 
was
 
imported
 
into
 
Carlson
 
Mining
®
 
(formerly
 
SurvCADD
®
)
 
geological
 
modelling
software
 
in the
 
form
 
of Microsoft
®
 
Excel
 
files incorporating,
 
drill hole
 
collars,
 
seam and
 
thickness
picks, bottom
 
seam elevations
 
and raw
 
and washed
 
coal quality.
 
These data
 
files were
 
validated
prior to importing into the software.
 
Once imported, a geologic model was created, reviewed, and
verified with
 
a key
 
element being
 
a gridded model
 
of coal
 
seam thickness.
 
Resource tonnes
 
were
estimated by using the
 
seam thickness grid
 
based on each valid
 
point of observation and
 
by defining
resource confidence arcs around the
 
points of observation.
 
Points of observation for Measured
 
and
Indicated
 
confidence
 
arcs
 
were
 
defined
 
for
 
all
 
valid
 
drill
 
holes
 
that
 
intersected
 
the
 
seam
 
using
standards
 
deemed acceptable
 
by MM&A
 
based on
 
a detailed
 
geologic evaluation
 
and a
 
statistical
analysis
 
of
 
all
 
drill
 
holes
 
within
 
the
 
projected
 
reserve
 
areas
 
as
 
described
 
in
Section
 
11.1.1
.
 
The
geological
 
evaluation
 
incorporated
 
an
 
analysis
 
of
 
seam
 
thickness
 
related
 
to
 
depositional
environments, adjacent roof and floor lithologies, and structural influences.
After validating coal seam data and establishing correlations, the thickness and elevation for seams
of
 
economic
 
interest
 
were
 
used
 
to
 
generate
 
a
 
geologic
 
model.
 
Due
 
to
 
the
 
relative
 
structural
simplicity
 
of
 
the
 
deposits
 
and
 
the
 
reasonable
 
continuity
 
of
 
the
 
tabular
 
coal
 
beds,
 
the
 
principal
geological
 
interpretation
 
necessary
 
to
 
define
 
the
 
geometry
 
of
 
the
 
coal
 
deposits
 
is
 
the
 
proper
modeling
 
of
 
their
 
thickness
 
and
 
elevation.
 
Both
 
coal
 
thickness
 
and
 
quality
 
data
 
are
 
deemed
 
by
MM&A to be reasonably sufficient within the resource areas.
 
Therefore, there is a reasonable level
of confidence in the geologic
 
interpretations required for coal resource determination based on the
available data
 
and the techniques applied to the data.
Table 11-1
 
below provides the geological mapping and
 
coal tonnage estimation criteria used for the
coal resource
 
and reserve
 
evaluation.
 
These cut-off
 
parameters
 
have
 
been developed
 
by MM&A
based on
 
its experience
 
with the
 
Coronado properties
 
and are
 
typical of
 
mining operations
 
in the
Northern Appalachian Coal
 
Basin.
 
This experience includes
 
technical and economic
 
evaluations of
numerous
 
properties
 
in the
 
region
 
for
 
the
 
purposes of
 
determining
 
the
 
economic
 
viability of
 
the
subject coal reserves.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
27
Table 11-1:
 
General Reserve and Resource Criteria
Item
Parameters
Technical Notes & Exceptions*
•
 
General Reserve Criteria
 
 
Reserve Classification
Reserve and Resource
Reliability Categories
Reserve (Proven and Probable)
To better reflect geological conditions of the coal
deposits, distance between points of observation are
standard USGS (in meters), respectively, for measured
and indicated and inferred.
Effective Date of Resource
Estimate
December 31, 2022
Effective Date of Reserve Estimate
December 31, 2022
Seam Density
Variable, dependent upon seam characteristics (based
on available drill hole quality).
 
In the absence of
laboratory data, estimated by (1) assuming specific
gravity of 1.30 for coal and 2.25 to 2.5 for rock
parting, or (2) 1280 kg/m
3
to 1324 kg/m
3
 
for a "clean"
seam)
•
 
Underground-Mineable Criteria
Map Thickness
Total seam thickness
Minimum Seam Thickness
1.2 meters (locally <1.2 m for limited areas integral to
the mine plan)
Pangburn was mapped at 0.92-meter cutoff in
conjunction with Coronado mine plan.
Minimum Mining Thickness
1.4 meters
Minimum In-Seam Wash Recovery
40 percent
 
Wash Recovery Applied to Coal
Reserves
Based on average yield for drill holes within reserve
area, or in the absence of laboratory washability data,
based on estimated visual recovery using specific
gravities noted above and 95 percent yield on "clean"
coal
Out-of-Seam Dilution Thickness
for Run-of-Mine Tonnes Applied
to Coal Reserves
0.05 meters minimum
2243 kg/m³ density used for dilution tonnage estimate
Mine Barrier
61-meter distance from abandoned mines and sealed
or pillared areas.
Adjustments Applied to Coal
Reserves
6 percent moisture increase; 5 percent preparation
plant inefficiency
Note:
 
Exceptions for
 
application of
 
these criteria
 
to resource
 
and reserve
 
estimation are
 
made as
 
warranted and
 
demonstrated by
 
either actual
 
mining
experience or detailed data
 
that allows for empirical
 
evaluation of mining conditions.
 
Final classification of coal
 
reserve is made based on
 
the pre-
feasibility evaluation.
11.1.1
Geostatistical Analysis
MM&A completed a
 
geostatistical analysis on drill
 
holes within
 
the reserve boundaries
 
to determine
the applicability of the common United States classification system for measured and indicated and
inferred coal resources.
 
Historically,
 
the United States has assumed that coal within 0.4-kilometers
of a point of
 
observation represents a measured resource whereas coal
 
between 0.4 kilometers and
1.2
 
kilometers
 
from
 
a
 
point
 
of
 
observation
 
is
 
classified
 
as
 
indicated.
 
Inferred
 
resources
 
are
commonly
 
assumed
 
to
 
be
 
located
 
between
 
1.2
 
kilometers
 
and
 
4.8
 
kilometers
 
from
 
a
 
point
 
of
observation.
 
Per
 
SEC regulations,
 
only measured
 
and
 
indicated
 
resources
 
may
 
be considered
 
for
reserve classification, respectively as proven and probable reserves.
MM&A
 
performed
 
a
 
geostatistical
 
analysis
 
test
 
of
 
the
 
Mon
 
Valley
 
data
 
set
 
using
 
the
 
Drill
 
Hole
Spacing Analysis
 
(
DHSA
) method.
 
This method
 
attempts
 
to quantify
 
the uncertainty
 
of applying
 
a
measurement
 
from
 
a
 
central
 
location
 
to
 
increasingly
 
larger
 
square
 
blocks
 
and
 
provides
recommendations
 
for determining
 
the distances
 
between drill
 
holes for
 
measured, indicated,
 
and
inferred resources.
ex964p2i0
 
 
ex964p36i2 ex964p36i0
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
28
To
 
perform DHSA the data
 
set was processed to remove
 
any erroneous data points,
 
clustered data
points, as
 
well as
 
directional trends.
 
This was
 
achieved through
 
the use
 
of histograms,
 
as seen
 
in
Figure 11-1
, color coded scatter
 
plots showing the geospatial positioning
 
of the borings,
Figure 11-
2
, and trend analysis.
Figure 11-1: Histogram of the Total
 
Seam Thickness
for the Upper Freeport Seam Present in the Mon
Valley Complex
Figure 11-2: Scatter plot of the Total Seam
Thickness for the Upper Freeport Seam Present
in the Mon Valley Complex
Following the completion of
 
data processing, a variogram
 
of the data set was
 
created,
Figure 11-3
.
 
The
 
variogram
 
plots average
 
square difference
 
against
 
the separation
 
distance
 
between
 
the data
pairs.
 
The
 
separation
 
distance
 
is broken
 
up into
 
separate
 
bins defined
 
by a
 
uniform
 
lag distance
(e.g., for
 
a lag
 
distance of
 
152 meters
 
the bins
 
would be
 
0 –
 
152 meters,
 
153 –
 
305 meters,
 
etc.).
 
Each pair of data points that are less than one lag distance apart are reported in the first bin.
 
If the
data
 
pair
 
is
 
further
 
apart
 
than
 
one
 
lag
 
distance
 
but
 
less
 
than
 
two
 
lag
 
distances
 
apart,
 
then
 
the
variance is reported in the second bin.
 
The numerical average for differences
 
reported for each bin
is then plotted on the variogram.
 
Care was taken to
 
define the lag distance in such a way
 
as to not
overestimate any nugget effect
 
present in the data set.
 
Lastly, modeled equations, often spherical,
gaussian, or
 
exponential, are
 
applied to
 
the variogram
 
in order
 
to represent
 
the data
 
set across
 
a
continuous spectrum.
ex964p2i0
 
 
ex964p37i1
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
29
Figure 11-3:
 
Variogram of the Total
 
Seam Thickness for the Upper Freeport Seam
 
Present in the Mon Valley Complex
The estimation
 
variance is
 
then calculated
 
using information
 
from the
 
modeled variogram
 
as well
as
 
charts
 
published
 
by
 
Journel
 
and
 
Huijbregts
 
(1978).
 
This
 
value
 
estimates
 
the
 
variance
 
from
applying
 
a
 
single
 
central
 
measurement
 
to
 
increasingly
 
larger
 
square
 
blocks.
 
Care
 
was
 
taken
 
to
ensure any nugget effect present was added back
 
into the data.
 
This process was repeated for each
test block size.
The final step of the process
 
is to calculate the
 
global estimation variance.
 
In this step the number
square
 
blocks that
 
would fit
 
inside the
 
selected study
 
area is
 
determined for
 
each block
 
size that
was
 
investigated
 
in the
 
previous
 
step.
 
The estimation
 
variance
 
is then
 
divided by
 
the number
 
of
blocks that
 
would fit
 
inside the
 
study area
 
for
 
each test
 
block size.
 
Following this
 
determination,
the data is then transformed back to represent
 
the relative error in the 95
th
-percentile range.
Figure 11-4
shows the results
 
of the
 
DHSA performed on
 
the Upper Freeport
 
data for the
 
Mon Valley
Complex.
 
DHSA provides hole
 
to hole
 
spacing values,
 
these distances need
 
to be converted
 
to radius
from a central point in order to
 
compare to the historical standards.
 
A summary of the radius data
is shown
 
in
Table
 
11-2
.
 
DHSA prescribes
 
measured, indicated,
 
and inferred
 
drill hole
 
spacings be
determined at the 10-percent, 20-percent, and 50-percent
 
levels of relative error,
 
respectively.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex964p38i1
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
30
Figure 11-4:
 
Result of DHSA for the Upper Freeport Seam Present in the Mon Valley Complex
Table 11-2:
 
DHSA Results Summary for Radius from a Central Point
Model:
Measured Radial Distance
(10% Relative Error)
Indicated Radial Distance
(20% Relative Error)
Inferred Radial Distance
(50% Relative Error)
(km)
(km)
(km)
Gaussian:
0.72
1.42
3.53
Spherical:
0.72
1.42
3.53
Exponential:
0.75
1.43
3.49
Comparing
 
the
 
results
 
of
 
the
 
DHSA
 
to
 
the
 
historical
 
standards,
 
it
 
is
 
evident
 
that
 
the
 
historical
standards
 
are
 
more
 
conservative
 
than
 
even
 
the
 
most
 
conservative
 
DHSA
 
model
 
with
 
regards
 
to
determining measured resources.
 
The Gaussian and Spherical
 
models recommend using a radius
 
of
0.72 kilometers
 
for
 
measured resources
 
compared to
 
the historical
 
value of
 
0.4 kilometers.
 
With
respect
 
to
 
indicated
 
resources
 
the
 
DHSA
 
falls
 
in
 
line
 
closely
 
with
 
the
 
historical
 
standards.
 
The
Exponential model recommends using a radius of 1.43
 
kilometers, while the Spherical and Gaussian
models recommend a radius of 1.42
 
kilometers, respectively.
 
These values line up closely with the
historical radius
 
of 1.2 kilometers.
 
These results have
 
led the QPs
 
to report the
 
data following
 
the
historical classification standards, rather
 
than use the results of the DHSA.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
31
11.2
Qualified Person’s Estimates
Mineral
 
resources,
 
representing
 
in-situ
 
coal
 
from
 
a
 
portion
 
of
 
which
 
reserves
 
are
 
derived,
 
are
presented below.
 
Based on the work described and detailed modelling of the areas
 
considering all
the parameters
 
defined, a
 
coal resource
 
estimate,
 
summarized
 
in
Table
 
11-3
, was
 
prepared
 
as of
December 31, 2022, for property controlled by Coronado.
Table 11-3:
 
Coal Resources Summary as of December 31, 2022
 
Coal Resource (Dry Tonnes, In Situ, Mt)
Resource Quality (Dry)
Area
Measured
Indicated
Inferred
Total
Ash%
Sulfur%
VM%
Inclusive of Reserve
291.0
213.5
9.3
513.8
31
1.4
26
Exclusive of Reserve
0.0
0.0
0.0
0.0
Total 12/31/2022
291.0
213.5
9.3
513.8
Note:
 
Resource tonnes are inclusive of reserve tonnes since they include the in-situ tonnes from which recoverable coal reserves are derived.
Note 2:
 
Coal resources are reported on a dry basis.
 
Surface moisture and inherent moisture are excluded.
Note 3: The Mon Valley properties do not have any resource tonnes exclusive of reserves as of December 31, 2022.
11.3
Qualified Person’s Opinion
While
 
there
 
is
 
some
 
level
 
of
 
stratigraphically
 
controlled
 
seam-thickness
 
variability
 
due
 
to
 
sand
channels,
 
etc.,
 
the
 
Upper
 
Freeport
 
coal
 
seam
 
on
 
the
 
mine
 
property
 
at
 
Mon
 
Valley
 
demonstrate
reasonable thickness consistency
 
according to
 
the classification system
 
of
measured
 
(0 kilometers
– 0.4
 
kilometers),
indicated
 
(0.4 kilometers
 
to 1.2
 
kilometers),
 
and
inferred
 
(1.2 kilometers
 
to 4.8
kilometers).
 
MM&A geologists and
 
engineers modeled
 
the deposit
 
and delineated
 
mineable regions
to
 
reflect
 
the nature
 
of each
 
seam and
 
the practicality
 
of mining
 
constraints.
 
Based on
 
MM&A’s
geostatistical
 
analysis,
 
it
 
would
 
be
 
possible
 
to
 
extend
 
the
 
measured,
 
indicated
 
and
 
inferred
 
arcs
slightly beyond
 
historically accepted
 
practices due to
 
consistent geological
 
settings.
 
The QPs have
again
 
elected
 
not
 
to
 
extend
 
arc
 
distances,
 
introducing
 
a
 
level
 
of
 
conservatism
 
in
 
measured
 
and
indicated coal classification.
Based on the data
 
review,
 
the attendant work
 
done to verify the data
 
integrity and the creation
 
of
an
 
independent
 
geologic model,
 
the
 
QPs
 
believe
 
this
 
is a
 
fair
 
and
 
accurate
 
representation
 
of the
Mon Valley coal resources.
12
Mineral Reserve Estimates
12.1
Assumptions, Parameters and Methodology
Coal Reserves are classified as
proven
 
or
probable
 
considering “modifying factors” including mining,
metallurgical, economic, marketing, legal,
 
environmental, social, and governmental
 
factors.
ex964p2i0
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
32
>
Proven Coal Reserves
 
are the economically mineable part of a measured coal resource,
adjusted for diluting materials and allowances for losses when the material is mined.
 
It is based
on appropriate assessment and studies in consideration of and adjusted
 
for reasonably
assumed modifying factors.
 
These assessments demonstrate that extraction
 
could be
reasonably justified at the time of reporting.
 
>
Probable Coal Reserves
 
are the economically mineable part of an indicated coal resource, and
in some circumstances a measured coal resource, adjusted
 
for diluting materials and
allowances for losses when the material is mined.
 
It is based on appropriate assessment and
studies in consideration of and adjusted for
 
reasonably assumed modifying factors.
 
These
assessments demonstrate that extraction
 
could be reasonably justified at the time of reporting.
Upon completion of delineation
 
and calculation of coal
 
resources, MM&A generated a LOM plan
 
for
each of the projected
 
mines within the Mon Valley
 
Complex.
 
The footprint of
 
each reserve area
 
is
shown on the maps in
Appendix B
.
 
The mine plans were generated based on the
 
forecast mine plan
and
 
permit
 
plan
 
provided
 
by
 
Coronado
 
with
 
modifications
 
by
 
MM&A
 
where
 
necessary
 
due
 
to
current
 
property
 
control
 
limits,
 
modifications
 
to
 
geologic
 
mapping,
 
or
 
other
 
factors
 
determined
during the evaluation.
Carlson Mining
 
software was
 
used to
 
generate
 
the LOM
 
plan for
 
Mon Valley.
 
The mine
 
plan was
sequenced
 
based
 
on
 
productivity
 
schedules
 
provided
 
by
 
Coronado.
 
MM&A
 
determined
 
the
productivity
 
estimates
 
and
 
plans
 
to
 
be
 
reasonable
 
based
 
on
 
experience
 
and
 
current
 
industry
practice.
At
 
the Mon
 
Valley
 
mines, a
 
minimum mining
 
height
 
of 1.4
 
meters
 
was
 
generally
 
used due
 
to the
continuous mining method
 
being employed;
 
however, Pangburn was mapped at
 
a 0.92-meter cutoff
in
 
conjunction
 
with
 
the
 
Coronado
 
mine
 
plan.
 
For
 
coal
 
seams
 
thinner
 
than
 
the
 
assigned
 
mining
height, the difference between the coal seam height and assigned mining height consists of out-of-
seam
 
dilution
 
(
OSD
).
 
Mine
 
recovery
 
generally
 
varies
 
between
 
40
 
percent
 
and
 
55
 
percent
 
for
continuous mining panels.
 
Plant recovery is
 
a function
 
of in-seam
 
recovery, OSD and plant efficiency
factor,
 
which is set at 95 percent.
 
Typical entry width is 5.8 meters.
Raw,
 
ROM
 
production
 
data
 
outputs
 
from
 
LOM
 
plan
 
sequencing
 
were
 
processed
 
into
 
Microsoft
®
EXCEL spreadsheets
 
and summarized
 
on an
 
annual basis
 
for processing
 
into the
 
economic model.
 
Average seam densities were
 
estimated to determine raw
 
coal tonnes produced
 
from the LOM
 
plan.
 
Average mine recovery
 
and wash recovery factors were
 
applied to determine coal reserve tonnes.
 
Coal
 
reserve
 
tonnes
 
in
 
this
 
evaluation
 
are
 
reported
 
at
 
a
 
6.0
 
percent
 
moisture
 
and
 
represent
 
the
saleable product from the Property.
 
Pricing data
 
as provided
 
by Coronado
 
is described
 
in
Section 16.2
.
 
The pricing
 
data
 
assumes HVB
domestic and
 
export FOB-mine
 
prices of
 
approximately $130 and
 
$114 per
 
metric tonne
 
for calendar
year 2028.
 
HVB domestic and export
 
prices respectively increase to
 
approximately $204
 
and $178
per metric tonne through year 2050, and then increased by 2% annual inflation thereafter.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
33
The coal resource mapping and estimation process, described in the report, was
 
used as a basis for
the coal reserve
 
estimate.
 
Proven and
 
probable coal
 
reserves were
 
derived from
 
the defined coal
resource
 
considering
 
relevant
 
processing,
 
economic
 
(including
 
technical
 
estimates
 
of
 
capital,
revenue, and cost), marketing,
 
legal, environmental, socio-economic, and
 
regulatory factors and are
presented on a moist, recoverable
 
basis.
As is customary
 
in the USA, the categories
 
for proven
 
and probable coal reserves
 
are based on the
distances
 
from
 
valid
 
points
 
of
 
measurement
 
as
 
determined
 
by
 
the
 
QPs
 
for
 
the
 
area
 
under
consideration.
 
For this
 
evaluation, measured
 
resource, which
 
may convert
 
to a
 
proven reserve,
 
is
based on a 0.4-kilometer radius from a valid point of observation.
Points
 
of observation
 
include exploration
 
drill holes,
 
degas holes,
 
and mine
 
measurements which
have been fully vetted
 
and processed into a
 
geologic model.
 
The geologic model is based on seam
depositional modeling, the
 
interrelationship of overlying and
 
underlying strata on seam mineability,
seam thickness trends,
 
the impact of seam
 
structure (i.e., faulting),
 
intra-seam characteristics,
 
etc.
 
Once
 
the
 
geologic
 
model
 
was
 
completed,
 
a
 
statistical
 
analysis,
 
described
 
in
Section
 
11.1.1
 
was
conducted
 
and
 
a
 
0.4-kilometer
 
radius
 
from
 
a
 
valid
 
point
 
of
 
observation
 
was
 
selected
 
to
 
define
Measured Resources.
 
Likewise,
 
the distance
 
between 0.4
 
and 1.2 of
 
a kilometer
 
radius was
 
selected to
 
define Indicated
Resources.
 
Indicated Resources may convert
 
to Probable Reserves
 
Inferred Resources (greater
 
than a 1.2-kilometer radius from a valid point of observation) are to be
excluded from Reserve consideration.
12.2
Qualified Person’s Estimates
Reserve tonnage
 
estimates provided
 
herein report
 
coal reserves
 
derived from
 
the in-situ resource
tons presented in
Table 11-3
, and not in addition to coal resources.
 
Coal reserves are presented on
a ROM basis in
Table
 
12-1
.
 
Proven and probable
 
coal reserves were
 
derived from the defined
 
coal
resource considering
 
relevant mining,
 
processing, infrastructure,
 
economic (including estimates
 
of
capital, revenue, and cost), marketing, legal,
 
environmental, socio-economic and regulatory factors.
 
The coal reserves, as shown in
Table 12-2
, are based on a technical evaluation of the geology and a
preliminary
 
feasibility
 
study
 
of
 
the
 
coal
 
deposits.
 
The
 
extent
 
to
 
which
 
the
 
coal
 
reserves
 
may
 
be
affected by any
 
known environmental, permitting, legal,
 
title, socio-economic, marketing, political,
or other relevant issues has been reviewed
 
rigorously.
 
Similarly, the extent
 
to which the estimates
of
 
coal
 
reserves
 
may
 
be
 
materially
 
affected
 
by
 
mining,
 
metallurgical,
 
infrastructure
 
and
 
other
relevant factors
 
has also been considered.
Table 12-1:
 
Coal Summary (ROM Basis (Moist)) as of December 31, 2022 (Mt)
 
Demonstrated Coal Reserves (Mt, Moist ROM)
 
 
 
 
By Reliability Category
By Mining Type
By Control Type
Quality (Dry)
Area / Mine
Proved
Probable
Total
Surface
UG
Owned
Leased
Ash
Sulfur
Vol
Mon Valley
113.9
83.2
197.1
0.0
197.1
195.7
1.4
37
1.4
23
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
34
Table 12-2:
 
Coal Reserves Summary (Marketable Sales Basis) as of December 31, 2022 (Mt)
 
Demonstrated Coal Reserves (Wet Tons,
 
Washed or Direct Shipped, Mt)
Quality (Dry Basis)
 
By Reliability Category
By Mining Type
By Control Type
Property
Proven
Probable
Total
Surface
UG
Owned
Leased
Ash%
Sulfur%
VM%
Mon Valley
77.8
56.6
134.4
0.0
134.4
133.4
1.0
8
1.4
35
 
Note: Marketable reserve tonnes are reported on a moist basis, including a combination of surface and inherent moisture.
 
The combination of
surface and inherent moisture is modeled at 6-percent.
 
Actual product moisture is dependent upon multiple geological factors, operational
factors, and product contract specifications and can exceed 8-percent.
 
As such, the modeled moisture values provide a level of conservatism
for reserve reporting.
The
 
results
 
of
 
this
 
TRS
 
define
 
an
 
estimated
 
134.4
 
Mt
 
of
 
proven
 
and
 
probable
 
marketable
 
coal
reserves.
 
Of that total, 58 percent are proven, and 42 percent are probable.
 
There are 133.4 Mt of
owned
 
coal
 
reserves
 
and
 
1.0
 
Mt
 
of
 
leased
 
coal
 
reserves.
 
All
 
of
 
the
 
Mon
 
Valley
 
reserves
 
are
considered
 
to
 
be
 
suitable
 
for
 
the
 
metallurgical
 
coal
 
market.
 
All
 
of
 
the
 
Mon
 
Valley
 
reserves
 
are
unassigned.
12.3
Qualified Person’s Opinion
The
 
estimate
 
of coal
 
reserves was
 
determined
 
in accordance
 
with the
 
JORC
 
Code along
 
with SEC
Regulation S-K 1300.
The LOM
 
mining plans
 
for Mon
 
Valley
 
were prepared
 
to the
 
level of
 
preliminary feasibility.
 
Mine
projections
 
were
 
prepared,
 
and
 
timing
 
scheduled
 
to
 
match
 
production
 
with
 
coal
 
seam
characteristics.
 
Production timing
 
was carried
 
out from
 
current locations
 
to depletion
 
of the
 
coal
reserve
 
area.
 
Coal reserve
 
estimates
 
could be
 
materially
 
affected
 
by the
 
risk factors
 
described in
Section 22.2
.
Based on the Preliminary Feasibility Study
 
and the attendant Economic Review, the QPs believe this
is a fair and accurate calculation of the Mon Valley
 
coal reserves.
13
Mining Methods
Three separate underground mine areas were modeled and tested economically
 
for the Mon Valley
Complex.
 
Once the Resources were calculated,
 
mine plans were created to
 
project operating each
resource
 
area to
 
depletion, with
 
crews
 
and equipment
 
scheduled to
 
move
 
to
 
subsequent
 
mining
areas as depletion occurs.
 
Underground mine operations are projected to
 
be exhausted in 2100.
ex964p2i0
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
35
13.1
Geotech and Hydrology
Mining
 
plans
 
for
 
potential
 
underground
 
mines
 
were
 
developed
 
by
 
Coronado
 
and
 
MM&A.
 
Pillar
stability
 
was
 
tested
 
by MM&A
 
using the
Analysis of
 
Coal Pillar
 
Stability
 
(ACPS)
 
program
 
that
 
was
developed by the
National Institute for Occupational Safety and
 
Health (
NIOSH
)
.
 
MM&A reviewed
the results from the ACPS analysis and considered them in the development of the LOM plan.
Hydrology is not
 
expected to be
 
an issue of concern at
 
Mon Valley.
 
Extensive mining has occurred
in the Pittsburgh seam,
 
183 meters above the Upper
 
Freeport horizon.
 
The Upper Freeport coal
 
has
been mined
 
in the
 
region—based on
 
successful historical
 
mining in
 
comparable
 
geologic settings,
material impacts related to hydrology
 
are not anticipated to be of concern.
13.2
Production Rates
The Mon Valley Complex is not
 
yet active, with three
 
distinct mines and preparation plants
 
planned.
 
The
 
mine
 
plan
 
and
 
productivity
 
expectations
 
reflect
 
historical
 
performance
 
of
 
similar
 
operations
and efforts have been made to adjust the
 
plan to reflect future conditions.
 
MM&A is confident that
the mine plan
 
is reasonably representative to provide
 
an accurate estimation of
 
coal reserves.
 
Mine
development and operation has not been optimized within the TRS.
Production
 
is
 
scheduled
 
for
 
approximately
 
273
 
days
 
each
 
year,
 
which
 
represents
 
production
 
on
Monday through
 
Friday plus
 
every other
 
Saturday with
 
allowances for
 
holidays.
 
On each day,
 
the
continuous mining
 
sections produce coal
 
on two shifts;
 
the third shift
 
is reserved for
 
maintenance
and mine conveyor
 
belt and power
 
moves.
 
The sections are
 
configured as full
 
super sections with
two continuous
 
miners per
 
section.
 
Productivity is
 
planned at
 
the rate
 
of 272
 
meters
 
of advance
per shift for
 
the super sections.
Carlson Mining software was used
 
by MM&A to generate mine plans
 
for the underground mineable
coal
 
seam.
 
Mine
 
plans
 
were
 
sequenced
 
based
 
on
 
productivity
 
schedules
 
provided
 
by
 
Coronado,
which
 
were
 
based
 
on
 
historically
 
achieved
 
productivity
 
levels.
 
All
 
production
 
forecasting
 
ties
assumed production rates
 
to geological models as
 
constructed by MM&A’s
 
team of geologists
 
and
mining engineers.
As shown in
Table
 
13-1
, the areas
 
planned for
 
underground mines
 
produce coal
 
until 2100.
 
Clean
coal production varies directly with coal thickness.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
36
Table 13-1:
 
Production Summary by Mine by Year (000)
Mine Name
2023
2024
2025
2026
2027
2028
2029
2030
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
0
0
0
0
0
0
0
0
Shaner
0
0
0
0
0
0
0
0
 
Total
0
0
0
0
0
0
0
0
 
 
 
 
 
 
 
 
 
Mine Name
2031
2032
2033
2034
2035
2036
2037
2038
Pangburn
0
399
1,810
1,875
1,958
2,029
2,030
1,695
Fallowfield
0
0
0
0
0
0
0
0
Shaner
0
0
0
0
0
0
0
367
 
Total
0
399
1,810
1,875
1,958
2,029
2,030
2,062
 
 
 
 
 
 
 
 
 
Mine Name
2039
2040
2041
2042
2043
2044
2045
2046
Pangburn
1,339
637
603
0
0
0
0
0
Fallowfield
0
0
0
0
0
0
0
0
Shaner
620
1,125
1,763
1,804
1,724
1,717
1,641
1,719
 
Total
1,960
1,762
2,366
1,804
1,724
1,717
1,641
1,719
 
 
 
 
 
 
 
 
 
Mine Name
2047
2048
2049
2050
2051
2052
2053
2054
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
0
0
0
0
0
0
0
0
Shaner
1,657
1,582
1,704
1,656
1,732
1,702
1,596
1,642
 
Total
1,657
1,582
1,704
1,656
1,732
1,702
1,596
1,642
 
 
 
 
 
 
 
 
 
Mine Name
2055
2056
2057
2058
2059
2060
2061
2062
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
0
0
859
1,780
2,009
2,006
1,987
1,814
Shaner
1,750
1,751
1,750
1,796
1,723
1,839
1,775
1,674
 
Total
1,750
1,751
2,609
3,576
3,732
3,846
3,762
3,488
 
 
 
 
 
 
 
 
 
Mine Name
2063
2064
2065
2066
2067
2068
2069
2070
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
1,657
1,861
1,893
1,894
1,869
1,869
1,707
1,893
Shaner
1,733
1,605
1,504
1,067
957
610
612
395
 
Total
3,390
3,466
3,397
2,961
2,826
2,479
2,318
2,289
 
 
 
 
 
 
 
 
 
Mine Name
2071
2072
2073
2074
2075
2076
2077
2078
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
1,438
1,988
1,993
1,822
1,903
1,864
1,911
1,708
Shaner
0
0
0
0
0
0
0
0
 
Total
1,438
1,988
1,993
1,822
1,903
1,864
1,911
1,708
 
 
 
 
 
 
 
 
 
Mine Name
2079
2080
2081
2082
2083
2084
2085
2086
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
1,931
1,757
1,563
2,034
1,423
2,073
1,485
1,798
Shaner
0
0
0
0
0
0
0
0
 
Total
1,931
1,757
1,563
2,034
1,423
2,073
1,485
1,798
 
 
 
 
 
 
 
 
 
Mine Name
2087
2088
2089
2090
2091
2092
2093
2094
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
1,340
1,684
1,466
1,808
1,184
1,485
1,462
1,584
Shaner
0
0
0
0
0
0
0
0
 
Total
1,340
1,684
1,466
1,808
1,184
1,485
1,462
1,584
 
 
 
 
 
 
 
 
 
Mine Name
2095
2096
2097
2098
2099
2100
2101
2102
Pangburn
0
0
0
0
0
0
0
0
Fallowfield
1,229
1,570
1,590
1,258
831
356
0
0
Shaner
0
0
0
0
0
0
0
0
 
Total
1,229
1,570
1,590
1,258
831
356
0
0
ex964p2i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
37
13.3
Mining Related Requirements
A mine plan with
 
sequenced mining projections was prepared for each logical
 
mining unit.
 
For each
mine
 
plan,
 
the
 
appropriate
 
number
 
of
 
production
 
units
 
is
 
selected
 
for
 
the
 
resource
 
area,
 
and
 
a
productivity
 
level
 
assigned,
 
expressed
 
in
 
meters
 
of
 
advance
 
per
 
unit-shift
 
of
 
production.
 
The
productivity is
 
based on
 
the equipment
 
and personnel
 
configuration,
 
mining height
 
and expected
physical conditions.
13.4
Required Equipment and Personnel
Production
 
from
 
the proposed
 
Mon Valley
 
Complex
 
mines will
 
be conducted
 
using the
 
room
 
and
pillar method,
 
utilizing continuous miners
 
and haulage
 
using shuttle cars
 
to a
 
feeder-breaker located
at the
 
tail of
 
the section
 
conveyor
 
belt.
 
The feeder-breaker
 
crushes large
 
pieces of
 
coal and
 
rock
and regulates
 
coal feed
 
onto
 
the mine
 
conveyor.
 
Roof-bolting
 
machines are
 
used to
 
support the
roof
 
on the
 
continuous miner
 
sections.
 
Roof-bolting
 
machines are
 
used to
 
install
 
roof
 
bolts,
 
and
battery scoops are available to clean the
 
mine entries and assist
 
in delivery of mine
 
supplies to work
areas.
 
Other
 
supplemental
 
equipment,
 
such
 
as
 
personnel
 
carriers,
 
supply
 
vehicles,
 
etc.,
 
are
 
also
used daily.
Mine conveyors typically range in width
 
up to 1.5
 
meters.
 
Multiple belt flights
 
are arranged in series
to deliver raw coal to the underground storage.
 
Along the main and sub-main entries and panels, a
travel way
 
is provided for
 
personnel and materials
 
by rubber-tired
 
equipment or on rail.
 
The Mon
Valley
 
mines will use
 
conveyors
 
to transport
 
ROM coal from
 
the underground
 
production sections
to
 
the
 
surface
 
where
 
the
 
coal
 
may
 
be
 
sampled,
 
crushed,
 
washed
 
in
 
the
 
preparation
 
plant,
 
and
stockpiled to await shipment.
 
Surface
 
ventilation
 
fans
 
are
 
installed
 
as
 
needed
 
to
 
provide
 
a
 
sufficient
 
volume
 
of
 
air
 
to
 
ventilate
production sections, coal
 
haulage and transport
 
entries, battery charging stations, and
 
transformers
in accordance with approved plans.
 
High-voltage cables deliver power throughout the mine where
transformers reduce voltage for specific equipment
 
requirements.
 
The Mine
 
Improvement and New
Emergency Response Act of 2006
 
(
MINER Act
) requires that carbon monoxide detection systems be
installed
 
along
 
mine
 
conveyor
 
belts
 
and
 
that
 
electronic
 
two-way
 
tracking
 
and
 
communications
systems
 
be
 
installed
 
throughout
 
underground
 
mines.
 
Water
 
is
 
required
 
to
 
control
 
dust
 
at
production sections and along conveyor
 
belts, and to cool electric motors.
 
Water is available
 
from
nearby sources and is distributed within the mine by pipelines as required.
13.4.1
Mine:
 
Pangburn
The Pangburn mine is proposed to start in 2032 with
 
three continuous mining sections.
 
The Upper
Freeport
 
seam
 
will
 
be
 
accessed
 
via
 
decline
 
slope
 
and
 
vertical
 
shaft.
 
This
 
mine
 
will
 
produce
metallurgical coal from leased and owned mineral.
ex964p2i0
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
38
Production
 
is
 
scheduled
 
for
 
approximately
 
273
 
days
 
each
 
year,
 
which
 
represents
 
production
 
on
Monday
 
through
 
Friday
 
and
 
every
 
other
 
Saturday.
 
On
 
each
 
day,
 
three
 
production
 
sections
 
are
scheduled
 
to
 
produce
 
coal
 
on
 
two
 
shifts;
 
the
 
third
 
shift
 
is
 
reserved
 
for
 
maintenance
 
and
 
mine
conveyor belt and
 
power moves.
 
Each section
 
is configured as
 
full supersection
 
with two
 
continuous
miners available
 
for production.
 
Productivity is
 
planned at
 
the rate
 
of 272
 
meters of
 
advance per
shift for the super sections.
 
A total of 203 employees are assigned to the mine.
Principal production equipment on
 
each section includes two continuous
 
miners, two roof
 
bolters,
four shuttle
 
cars, and two
 
scoops.
 
Coal is extracted
 
from the production
 
face with the
 
continuous
miner and hauled to the mine conveyor in shuttle cars.
 
At the conveyor belt, the coal is discharged
from the shuttle cars onto a
 
feeder breaker for transfer onto the conveyor.
 
The conveyors carry the
coal outside, where
 
it is transported
 
via overland conveyor
 
to the proposed
 
Pangburn preparation
plant and barge load-out on the Monongahela River.
 
Rail access is provided by a
CSX rail line.
The proposed Pangburn mine will be located approximately 1.6 kilometers south of the community
of Elizabeth,
 
Pennsylvania.
 
Main paved
 
roads exist
 
both east
 
and west
 
of the
 
site.
 
The proposed
dock, located on the western boundary of the
 
proposed Pangburn permit area, is currently used for
bulk material transshipment.
 
The area has hosted
 
both industrial and residential
 
development for
an
 
extensive
 
time
 
period.
 
No
 
extraordinary
 
measures
 
or
 
expenses
 
will
 
be
 
required
 
to
 
establish
infrastructure or utilities at the Pangburn site.
 
The
 
preliminary
 
design
 
for
 
the
 
Pangburn
 
mine
 
surface
 
facilities
 
was
 
provided
 
by
 
Coronado.
 
The
facilities include offices, warehouses,
 
shops, and a bathhouse for personnel;
 
a preparation plant to
process ROM coal; a
 
refuse area with
 
a designed capacity
 
of approximately 35 million
 
refuse tonnes;
raw coal storage at the plant totaling
 
approximated 100,000 tonnes, clean coal storage
 
at the plant
site of
 
approximately
 
54,000 tonnes,
 
and three
 
clean coal
 
stockpiles adjacent
 
to the
 
dock loading
facility
 
on
 
the
 
Monongahela
 
River.
 
The
 
three
 
river
 
stockpiles
 
have
 
a
 
designed
 
capacity
 
of
approximately 266,000 tonnes.
A
 
study
 
completed
 
and
 
approved
 
through
 
the
Pennsylvania
 
Department
 
of
 
Environmental
Protection
 
on behalf
 
of Coronado
 
has
 
identified
 
a
 
Preferred
 
Site
 
for
 
refuse
 
disposal
 
at
 
Pangburn
with
 
capacity
 
of
 
22.6
 
million
 
cubic
 
meters.
 
MM&A’s
 
estimated
 
requirements
 
for
 
Pangburn
 
and
Shaner combined is 29.7 million tonnes or approximately 13.2 million cubic meters.
The preliminary design layout of the Pangburn facilities is shown
Figure 13-1
.
ex964p2i0
 
 
 
ex964p47i1
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
39
Figure 13-1:
 
Proposed Pangburn Plant and Mine Site Infrastructure
13.4.2
Mine: Shaner
The
 
Shaner
 
mine
 
is
 
a
 
proposed
 
mine
 
in
 
the
 
Upper
 
Freeport
 
seam
 
and
 
is
 
scheduled
 
to
 
begin
production in 2038 as the Pangburn reserve is depleted.
 
This mine is a metallurgical coal operation
on leased and owned mineral property.
Production
 
is
 
scheduled
 
for
 
approximately
 
273
 
days
 
each
 
year,
 
which
 
represents
 
production
 
on
Monday
 
through
 
Friday
 
and
 
every
 
other
 
Saturday.
 
On
 
each
 
day,
 
three
 
production
 
sections
 
are
scheduled
 
to
 
produce
 
coal
 
on
 
two
 
shifts;
 
the
 
third
 
shift
 
is
 
reserved
 
for
 
maintenance
 
and
 
mine
conveyor
 
belt
 
and
 
power
 
moves.
 
All
 
three
 
sections
 
are
 
full
 
super
 
sections
 
with
 
two
 
continuous
miners per
 
section.
 
Productivity is
 
planned at
 
the rate
 
of 272
 
meters of
 
advance per
 
shift for
 
the
super sections.
 
A total of 203 employees are assigned to the mine.
Principal production equipment per section includes two continuous miners,
 
two roof bolters, four
shuttle cars, and two scoops.
 
Coal is extracted from the production face with the continuous miner
ex964p2i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
40
and hauled to the
 
mine conveyor
 
in shuttle cars.
 
At the conveyor
 
belt, the coal is
 
discharged onto
a feeder breaker for transfer onto the conveyor.
 
The conveyors carry the coal to the outside and to
the preparation plant and load-out.
The Shaner
 
mine will
 
be located approximately 1.6
 
kilometers north of
 
the community
 
of Sutersville,
Pennsylvania,
 
between
 
the
 
Youghiogheny
 
and
 
Monongahela
 
Rivers.
 
Numerous
 
improved
 
roads
traverse the Property.
 
An additional shaft
 
and slope will
 
be required to access
 
Upper Freeport seam
reserves
 
west
 
of the
 
Monongahela
 
River,
 
accessed across
 
the 1
st
 
Street bridge
 
and Douglass
 
Run
Road.
 
The
 
immediate
 
vicinity
 
of
 
the
 
proposed
 
Shaner
 
surface
 
facilities
 
is
 
well
 
developed;
 
no
extraordinary
 
measures
 
or
 
expenses
 
will be
 
required
 
to
 
establish
 
infrastructure
 
or utilities
 
at
 
the
Fallowfield
 
site.
 
Due
 
to
 
the
 
projected
 
starting
 
date
 
for
 
the
 
Shaner
 
mine,
 
no
 
detailed
 
design
 
of
infrastructure or
 
surface facilities has
 
been completed to date.
 
The proposed mines are
 
located in
the
 
Appalachian
 
Basin,
 
which
 
has
 
an
 
extensive
 
history
 
(>100
 
years)
 
of
 
coal
 
mining.
 
There
 
is
 
a
sufficient population base
 
within commuting
 
distance of
 
the proposed
 
operations; no Camp
 
or Town
construction
 
will
 
be
 
required.
 
Mine
 
opening
 
capital
 
expenditures
 
are
 
included
 
in
 
the
 
MM&A
financial model.
Due to the projected start-up
 
date of the Shaner
 
mine, no permit work
 
has been completed to date.
 
The proposed mine
 
is located in
 
an area with
 
a long
 
history of coal
 
mining, with
 
numerous permitted
operations in close proximity.
 
Coal mining permits are routinely obtained in this region; a 2-year to
3-year
 
lead time
 
is recommended.
 
Estimated
 
expenditures for
 
mine closure
 
and site
 
reclamation
are included in the financial model for each mine or plant site.
Infrastructure for Shaner will resemble that
 
shown in
Figure 13-1
 
for Pangburn.
13.4.3
Mine: Fallowfield
The
 
Fallowfield
 
mine
 
is
 
proposed
 
to
 
start
 
in
 
2057
 
with
 
three
 
production
 
sections.
 
The
 
Upper
Freeport
 
seam
 
will
 
be
 
accessed
 
via
 
a
 
decline
 
slope
 
and
 
vertical
 
shaft.
 
This
 
mine
 
will
 
be
 
a
metallurgical coal operation on leased and owned mineral
 
property.
Production
 
is
 
scheduled
 
for
 
approximately
 
273
 
days
 
each
 
year,
 
which
 
represents
 
production
 
on
Monday
 
through
 
Friday
 
and
 
every
 
other
 
Saturday.
 
On
 
each
 
day,
 
three
 
production
 
sections
 
are
scheduled
 
to
 
produce
 
coal
 
on
 
two
 
shifts;
 
the
 
third
 
shift
 
is
 
reserved
 
for
 
maintenance
 
and
 
mine
conveyor belt and power
 
moves.
 
The sections are
 
configured as super sections
 
with two continuous
miners available
 
for production.
 
Productivity is
 
planned at
 
the rate
 
of 272
 
meters of
 
advance per
shift of operation.
 
A total of 203 employees are assigned to the mine.
Principal production equipment includes
 
two continuous miners, two roof bolters, four shuttle
 
cars,
and two scoops.
 
Coal is extracted from
 
the production face with the
 
continuous miner and hauled
to the mine
 
conveyor in
 
shuttle cars.
 
At the conveyor
 
belt, the coal
 
is discharged from
 
the shuttle
cars
 
onto
 
a feeder
 
breaker
 
for transfer
 
onto the
 
conveyor.
 
The conveyors
 
carry the
 
coal outside,
where
 
it
 
is
 
transported
 
to
 
the
 
Fallowfield
 
preparation
 
plant
 
and
 
truck
 
load-out
 
via
 
overland
conveyor.
 
ex964p26i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
41
The
 
Fallowfield
 
property
 
boundary
 
is
 
traversed
 
by
 
the
 
four-lane
 
limited-access
 
Mon-Fayette
Expressway in addition
 
to numerous improved
 
roads.
 
Previous mining and
 
coal preparation facilities
have
 
existed
 
in
 
the
 
immediate
 
vicinity
 
of
 
the
 
proposed
 
Fallowfield
 
surface
 
facilities.
 
No
extraordinary
 
measures
 
or
 
expenses
 
will be
 
required
 
to
 
establish
 
infrastructure
 
or utilities
 
at
 
the
Fallowfield site.
 
Due to the
 
projected starting
 
date for
 
the Fallowfield
 
mine, no detailed
 
design of
infrastructure or
 
surface facilities has
 
been completed to date.
 
The proposed mines are
 
located in
the Appalachian
 
Basin, which
 
has an
 
extensive history (greater than
 
100 years) of
 
coal mining.
 
There
is a sufficient population
 
base within commuting distance
 
of the proposed operations;
 
no Camp or
Town
 
construction will be required.
 
Mine opening capital expenditures are
 
included in the MM&A
financial model.
Due to the projected
 
start-up date
 
of the Fallowfield mine,
 
no permit work has been
 
completed to
date.
 
The proposed
 
mine is
 
located
 
in an
 
area with
 
a long
 
history of
 
coal mining,
 
with numerous
permitted
 
operations
 
in
 
close
 
proximity.
 
Coal
 
mining
 
permits
 
are
 
routinely
 
obtained;
 
a
 
two-
 
to
three-year
 
lead
 
time
 
is
 
recommended.
 
Estimated
 
expenditures
 
for
 
mine
 
closure
 
and
 
site
reclamation are included in the financial model for each mine or plant site.
Infrastructure for Fallowfield
 
will resemble that shown in
Figure 13-1
 
for Pangburn.
14
Processing and Recovery Methods
14.1
Description or Flowsheet
Due
 
to
 
the
 
projected
 
starting
 
date
 
for
 
the
 
Mon
 
Valley
 
Complex,
 
only
 
preliminary
 
design
 
of
preparation
 
plant
 
or
 
associated
 
material
 
handling
 
facilities
 
has
 
been
 
initiated
 
to
 
date.
 
Coal
processing
 
is
 
a
 
well
 
understood
 
science—it
 
is
 
anticipated
 
that
 
typical
 
coal
 
sizing,
 
cleaning
 
and
dewatering
 
equipment
 
will
 
be
 
utilized
 
for
 
processing
 
of
 
run-of-mine
 
coal
 
at
 
Pangburn,
 
including
combinations of
 
vibratory screens,
 
classifying cyclones, heavy
 
media baths, heavy
 
media cyclones,
spirals,
 
froth
 
flotation,
 
and
 
drain-and-rinse
 
screens,
 
screen-bowl
 
centrifuges,
 
among
 
others.
 
No
novel technologies will be required to process run-of-mine
 
material.
 
14.2
Requirements for Energy,
 
Water,
 
Material and Personnel
The Mon Valley property has sources
 
of water,
 
power,
 
personnel, and supplies readily available for
use.
 
Personnel
 
have
 
historically
 
been
 
sourced
 
from
 
the
 
surrounding
 
communities
 
in
 
Allegheny,
Washington, and
 
Westmoreland Counties, and have
 
proven to be adequate
 
in numbers to operate
the mines.
 
As mining is common in the surrounding
 
areas, the workforce
 
is generally familiar
 
with
mining practices, and
 
many are experienced
 
miners.
 
Water is
 
expected to be
 
sourced locally from
nearby public
 
water
 
sources or
 
rivers.
 
Electricity is
 
anticipated
 
to be
 
sourced from
 
West
 
Penn
or
Duquesne
 
Light.
 
The
 
service
 
industry
 
in
 
the
 
areas
 
surrounding
 
the
 
proposed
 
mine
 
complex
 
has
historically
 
provided
 
supplies,
 
equipment
 
repairs
 
and
 
fabrication,
 
etc.
 
Barge
 
transport
 
on
 
the
Monongahela River/Ohio River
 
system will
 
serve as the main means
 
of product transport from
 
the
ex964p2i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
42
mine,
 
and
 
currently
 
serve
 
as
 
a
 
means
 
of
 
coal
 
transportation
 
for
 
neighboring
 
Pittsburgh
 
seam
operations.
15
Infrastructure
Due
 
to
 
the
 
projected
 
starting
 
date
 
for
 
the
 
Mon
 
Valley
 
mines,
 
only
 
conceptual
 
design
 
of
infrastructure and surface facilities has
 
been completed to date.
 
The proposed Pangburn mine will be located approximately 1.6 kilometers south of the community
of Elizabeth, PA.
 
Main paved roads exist both
 
east and west of
 
the site.
 
The proposed dock, located
on the western boundary of the proposed Pangburn permit area, is currently used for bulk
 
material
transhipment.
 
The area
 
has hosted
 
both industrial
 
and residential
 
development
 
for
 
an extensive
time period.
 
No extraordinary measures or expenses will be
 
required to establish infrastructure
 
or
utilities at the Pangburn site.
 
The Shaner
 
mine will
 
be located approximately 1.6
 
kilometers north of
 
the community
 
of Sutersville,
PA,
 
between the Youghiogheny
 
and Monongahela Rivers.
 
Numerous improved
 
roads traverse
 
the
Property.
 
An additional
 
shaft and
 
slope will
 
be required
 
to access
 
Upper Freeport
 
seam reserves
west of the Monongahela
 
River,
 
accessed across the 1
st
 
Street bridge and Douglass
 
Run Road.
 
The
immediate
 
vicinity
 
of
 
the
 
proposed
 
Shaner
 
surface
 
facilities
 
is
 
well
 
developed;
 
no
 
extraordinary
measures or expenses will be required to establish
 
infrastructure or utilities at the Shaner site.
The
 
Fallowfield
 
property
 
boundary
 
is
 
traversed
 
by
 
the
 
4-lane
 
limited-access
 
Mon-Fayette
Expressway in addition
 
to numerous improved
 
roads.
 
Previous mining and
 
coal preparation facilities
have
 
existed
 
in
 
the
 
immediate
 
vicinity
 
of
 
the
 
proposed
 
Fallowfield
 
surface
 
facilities.
 
No
extraordinary
 
measures
 
or
 
expenses
 
will be
 
required
 
to
 
establish
 
infrastructure
 
or utilities
 
at
 
the
Fallowfield site.
 
Due to the
 
projected starting
 
date for
 
the Fallowfield
 
mine, no detailed
 
design of
infrastructure or surface facilities
 
has been completed to date.
 
A CSX
 
rail line
 
and loadout on
 
the Monongahela
 
River as
 
well as
 
barge transportation
 
on the
 
river
are expected to serve as the primary means of transport for produced coal.
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
43
16
Market Studies
16.1
Market Description
The quality
 
characteristics for
 
the subject
 
coal resources
 
and coal
 
reserves have
 
been reviewed
 
in
detail
 
by MM&A.
 
The drill
 
hole data
 
were
 
utilized to
 
develop
 
average
 
coal quality
 
characteristics
for
 
the mining
 
site.
 
These average
 
coal
 
quality characteristics
 
were
 
then utilized
 
as the
 
basis for
determining the various markets into which the saleable coal will likely
 
be placed.
 
The projected quality specifications for the Mon Valley
 
products are as shown in
Table 16-1
.
Table 16-1:
 
Quality Specifications by Product
 
HVB
Moisture (%)
7.50
Ash (%)
7.50
Sulfur (%)
1.2
Volatile Matter (%)
35
Btu/lb.
N/A
Fluidity (ddpm)
26,000
MMR (%)
0.98
CSR
55
FSI
7.50
Note:
 
All Specs are dry basis except Moisture.
 
Life-of-
mine sulfur for Pangburn is an estimated 1.21%; however,
overall Mon Valley Complex reserve average is 1.36%
sulfur.
All of the mine production is projected to serve the metallurgical markets.
 
The metallurgical coal is
marketed
 
as a
 
high-volatile (typically
 
greater
 
than 31
 
percent
 
volatile matter
 
content) product
 
on
both the domestic and export markets.
16.2
Price Forecasts
Coronado provided
 
MM&A with
 
price forecasts
 
for its
 
active operations.
 
Customer coal
 
pricing is
derived
 
from
 
market
 
observed
 
forward
 
estimates
 
based
 
on
 
global economic
 
supply
 
and
 
demand
analysis
 
which
 
is
 
applied
 
to
 
mine
 
plan
 
sales
 
volumes
 
and
 
product
 
mix
 
and
 
is
 
supplemented
 
with
Coronado’s in-house knowledge of applicable rail transportation charges, ocean
 
freight charges and
port
 
charges.
 
MM&A
 
extrapolated
 
the
 
provided
 
data
 
for
 
the
 
greenfield
 
Mon
 
Valley
 
operations.
 
Concurrent with aforementioned quality parameters
 
in the preceding section, production from the
proposed operations
 
is assumed to
 
be sold in
 
high volatile
 
domestic and export
 
coal markets
 
with
respective percentages of 66 percent
 
and 34 percent.
 
The pricing data assumes HVB domestic and
export FOB-mine
 
prices of approximately
 
$130 and $114
 
per metric tonne
 
for calendar
 
year 2028.
 
HVB domestic
 
and export
 
prices respectively
 
increase to
 
approximately
 
$204 and $178
 
per metric
tonne through year 2050, and then increased by 2% annual inflation thereafter.
ex964p2i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
44
Coal
 
price
 
forecasts
 
for
 
the
 
Mon
 
Valley
 
products
 
were
 
provided
 
by
 
Coronado
 
for
 
various
 
coal
markets in terms of US nominal dollars per metric tonne.
16.3
Contract Requirements
Some contracts are necessary for successful marketing of the
 
coal.
 
For Mon Valley, since all mining,
preparation and marketing is done in-house, the remaining
 
contracts required are:
>
Transportation
 
– The Mine contracts with barge transportation
 
companies or with CSX Railroad
to transport the coal to either of the domestic customers
 
ports for overseas shipments.
>
Handling
 
– Contracts for loading vessels for export
 
sales are necessary.
 
These are typically
handled by annual negotiations based on projected shipments.
>
Sales
– Sales contracts are a mix of spot and contract sales.
 
With the volatility of the market,
long-term contracts are not typically written.
17
Environmental Studies, Permitting and Plans,
Negotiations or Agreements with Local Individuals
 
17.1
Results of Studies
MM&A
 
is not
 
aware
 
of any
 
Phase
 
I Environmental
 
Site
 
Assessment
 
(
ESA
) completed
 
on the
 
Mon
Valley property on behalf
 
of Coronado.
 
Coronado reports not
 
having conducted such
 
a study.
 
Based
on our experience
 
with Coronado,
 
it is the
 
QPs’ opinion that
 
Coronado has a
 
generally typical
 
coal
industry
 
record
 
of
 
compliance
 
with
 
applicable
 
mining,
 
water
 
quality,
 
and
 
environmental
 
laws.
 
Estimated
 
costs
 
for
 
mine closure,
 
including water
 
quality monitoring
 
during site
 
reclamation,
 
are
included in the financial models.
17.2
Requirements and Plans for Waste
 
Disposal
A
 
study
 
completed
 
on
 
behalf
 
of
 
Coronado
 
has
 
identified
 
a
 
Preferred
 
Site
 
for
 
refuse
 
disposal
 
at
Pangburn
 
with
 
capacity
 
of
 
22.6
 
million
 
cubic
 
meters.
 
Estimated
 
requirements
 
for
 
Pangburn
 
and
Shaner combined is 29.7 million tonnes or approximately
 
13.2 million cubic meters.
 
Permitting for
such a facility is anticipated
 
to be achievable.
17.3
Permit Requirements and Status
All
 
mining
 
operations
 
are
 
subject
 
to
 
federal
 
and
 
state
 
laws
 
and
 
must
 
obtain
 
permits
 
to
 
operate
mines, coal preparation and related facilities,
 
haul roads, and other incidental surface disturbances
necessary for
 
mining to
 
occur.
 
Permits
 
generally
 
require
 
that
 
the
 
permittee
 
post
 
a
 
performance
bond in
 
an amount
 
established by the
 
regulatory program to provide
 
assurance that any
 
disturbance
or liability
 
created during
 
mining operations
 
is properly
 
restored
 
to an
 
approved post-mining
 
land
use and
 
that all
 
regulations and
 
requirements
 
of the
 
permits are
 
fully satisfied
 
before
 
the bond
 
is
returned
 
to
 
the
 
permittee.
 
Significant
 
penalties
 
exist
 
for
 
any
 
permittee
 
who
 
fails
 
to
 
meet
 
the
ex964p2i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
45
obligations
 
of
 
the
 
permits
 
including
 
cessation
 
of
 
mining
 
operations,
 
which
 
can
 
lead
 
to
 
potential
forfeiture
 
of the bond.
 
Any company,
 
and its directors,
 
owners, and
 
officers, which
 
are subject to
bond forfeiture can be denied future permits under the program.
1
The refuse disposal
 
area will receive
 
combined coarse refuse
 
from the proposed
 
preparation plant
by conveyor belts.
 
The fine material will be
 
processed by filter press technology where the
 
majority
of the water is removed.
 
The filter cake material will be placed on the refuse conveyor for
 
disposal
with the coarse portion of the refuse material.
New permits
 
or permit
 
revisions will occasionally
 
be necessary
 
to facilitate the
 
expansion or
 
addition
of new
 
mining areas
 
on the
 
properties, such
 
as amendments
 
to existing
 
permits and
 
new permits
for mining
 
of reserve
 
areas.
 
Exploration permits
 
are also
 
required.
 
Property under
 
lease includes
provisions
 
for
 
exploration
 
among
 
the
 
terms
 
of
 
the
 
lease.
 
New
 
or
 
modified
 
mining
 
permits
 
are
subject
 
to
 
a
 
public
 
advertisement
 
process
 
and
 
comment
 
period,
 
and
 
the
 
public
 
is
 
provided
 
an
opportunity
 
to
 
raise
 
objections
 
to
 
any
 
proposed
 
mining
 
operation.
 
MM&A
 
is
 
not
 
aware
 
of
 
any
specific
 
prohibition
 
of
 
mining
 
on
 
the
 
subject
 
property
 
and
 
given
 
sufficient
 
time
 
and
 
planning,
Coronado should
 
be able
 
to secure
 
new permits
 
to maintain
 
its planned mining
 
operations within
the context
 
of current
 
regulations.
 
Portions of
 
the properties
 
are located
 
near local
 
communities.
 
Regulations prohibit
 
mining activities within 91
 
meters of a
 
residential dwelling, school,
 
church, or
similar structure
 
unless written
 
consent is
 
first obtained
 
from the
 
owner of
 
the structure.
 
Where
required, such consents
 
have been obtained
 
where mining is
 
proposed beyond the
 
regulatory limits.
MM&A
 
is
 
unaware
 
of
 
any
 
obvious
 
or
 
current
 
Coronado
 
permitting
 
issues
 
that
 
are
 
expected
 
to
prevent the issuance of future
 
permits.
 
Coronado, along with all
 
coal producers, is subject to
 
a level
of uncertainty regarding future clean
 
water permits due to
United States Environmental Protection
Agency
(
EPA
)
 
and
United States Fish and Wildlife (
USFW
)
 
involvement with state programs.
 
17.4
Local Plans, Negotiations or Agreements
MM&A found
 
no indication
 
of requirements
 
for agreements
 
beyond the
 
scope of Federal
 
or State
Regulations.
1
 
Monitored under the Applicant Violator System (AVS) by the Federal Office of Surface Mining.
ex964p2i0
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
46
17.5
Mine Closure Plans
Applicable
 
regulations
 
require
 
that
 
mines
 
be
 
properly
 
closed,
 
and
 
reclamation
 
commenced
immediately
 
upon
 
abandonment.
 
In
 
general,
 
site
 
reclamation
 
includes
 
removal
 
of
 
structures,
backfilling, regrading, and revegetation of disturbed areas.
 
Sediment control is required during the
establishment of vegetation, and
 
bond release generally requires
 
a minimum
 
five-year period of
 
site
maintenance, water sampling, and
 
sediment control following
 
mine completion.
 
This requirement
is
 
reduced
 
to
 
two
 
years
 
for
 
certain
 
operations
 
involving
 
re-mining.
 
Reclamation
 
of underground
mines includes
 
closure and
 
sealing of
 
mine openings
 
such as
 
portals and
 
shafts in
 
addition to
 
the
items listed above.
 
Estimated
 
costs
 
for
 
mine closure,
 
including water
 
quality monitoring
 
during site
 
reclamation,
 
are
included in the financial
 
model.
 
As with all
 
mining companies, an accretion
 
calculation is performed
annually
 
so the
 
necessary Asset
 
Retirement
 
Obligations
 
(
ARO
) can
 
be shown
 
as
 
a Liability
 
on the
Balance Sheet.
17.6
Qualified Person’s Opinion
The QPs know
 
of no reason that any permits that may be required cannot be
 
obtained.
 
Estimated expenditures for site
 
closure and
 
reclamation are included
 
in the
 
financial model
 
for these
sites.
18
Capital and Operating Costs
18.1
Capital Cost Estimate
The production sequence selected for
 
a property must consider the proximity
 
of each reserve area
to
 
coal
 
preparation
 
plants,
 
river
 
docks
 
and
 
railroad
 
loading
 
points,
 
along
 
with
 
suitability
 
of
production equipment to coal seam conditions.
 
The in-place infrastructure was evaluated, and any
future needs were planned to a level suitable for a Preliminary Feasibility Study and included in the
Capital Forecast.
MM&A
developed
 
capital
 
spending
 
estimates
 
for
 
the
 
proposed
 
operations
 
in
 
the
 
Mon
 
Valley
Complex.
 
MM&A’s
 
capital schedules assume that major equipment rebuilds occur over the course
of each
 
machine’s remaining assumed operating
 
life.
 
Replacement equipment was
 
scheduled based
on MM&A’s
 
experience and
 
knowledge of
 
mining equipment
 
and industry
 
standards with
 
respect
to the useful life of such equipment.
 
A summary of the estimated capital for the Property is provided
 
in
Figure 18-1
 
below.
 
ex964p2i0
 
 
ex964p13i0
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
47
Figure 18-1:
 
CAPEX
18.2
Operating Cost Estimate
Coronado
 
provided
 
a
 
historical
 
summary
 
of
 
operating
 
costs
 
for
 
similar
 
operations
 
for
 
MM&A’s
review.
 
MM&A used the historical and/or budget cost information
 
as a reference and developed a
personnel
 
schedule
 
for
 
the
 
mine.
 
Hourly
 
labor
 
rates
 
and
 
salaries
 
were
 
based
 
upon
 
information
contained in Coronado’s financial summaries.
 
Fringe benefit costs were developed
 
for vacation and
holidays,
 
federal
 
and
 
state
 
unemployment
 
insurance,
 
retirement,
 
workers’
 
compensation
 
and
pneumoconiosis,
 
casualty
 
and
 
life
 
insurance,
 
healthcare,
 
and
 
bonuses.
 
A
 
cost
 
factor
 
for
 
mine
supplies was developed that
 
relates expenditures
 
to mine advance
 
rates for
 
roof control
 
costs and
other
 
mine
 
supply
 
costs
 
experienced
 
at
 
underground
 
mines.
 
Other
 
factors
 
were
 
developed
 
for
maintenance and repair costs, rentals, mine power,
 
outside services and other direct mining costs.
 
Other
 
cost
 
factors
 
were
 
developed
 
for
 
coal
 
preparation
 
plant
 
processing,
 
refuse
 
handling,
 
coal
loading, property
 
taxes,
 
and insurance
 
and bonding.
 
Appropriate
 
royalty
 
rates
 
were
 
assigned for
production from leased coal lands and sales
 
taxes were calculated
 
for federal black
 
lung excise tax,
and
 
federal
 
reclamation
 
fees.
 
There
 
are
 
currently
 
no
 
state
 
coal
 
severance
 
or
 
reclamation
 
taxes
required in Pennsylvania.
Mandated Sales Related Costs such as Black Lung Excise are
 
summarized in
 
Table 18-1.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
48
Table 18-1:
 
Estimated Coal Production Taxes
 
and Sales Costs
Description of Tax or Sales Cost
Basis of Assessment
Cost
Federal Black Lung Excise Tax
 
- Underground
Per Tonne
$1.21
 
Federal Reclamation Fees – Underground
Per Tonne
$0.13
 
Royalties – Underground
Percentage of Revenue
7%
Note:
 
1.
Federal black lung excise tax is paid only on coal sold domestically.
 
MM&A assumed 45% of total coal sales to be
domestic in the economic analysis discussed below.
A summary of the projected Operating Costs is in
Table 18-2
.
Table 18-2:
 
Mon Valley Operating Costs
 
 
YE
12/31
2023
YE
12/31
2024
YE
12/31
2025
YE
12/31
2026
YE
12/31
2027
YE
12/31
2028
YE
12/31
2029
YE
12/31
2030
Remaining
 
Total
LOM
Average
ROM Production Tonnes
198.4
-
-
-
-
-
-
-
-
2.9
Yield
68.19%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
68.19%
Saleable Production Tonnes
*
135.3
-
-
-
-
-
-
-
-
2.0
 
Thermal Tonnes
-
-
-
-
-
-
-
-
-
-
Domestic Met Tonnes
89.3
-
-
-
-
-
-
-
-
1.3
Export Met Tonnes
46.0
-
-
-
-
-
-
-
-
0.7
 
Total Saleable Tonnes
135.3
-
-
-
-
-
-
-
-
2.0
 
Cash Costs per Tonne:
Mining Costs
$100.61
$-
$-
$-
$-
$-
$-
$-
$-
$100.59
Processing and Transport
$37.98
$-
$-
$-
$-
$-
$-
$-
$-
$37.98
Sales Related Costs
$1.73
$-
$-
$-
$-
$-
$-
$-
$-
 
$1.73
 
G&A
 
$5.42
 
$-
$-
$-
$-
$-
$-
$-
$-
 
$5.42
 
 
Total Cash Costs
$145.74
$-
$-
$-
$-
$-
$-
$-
$-
$145.72
Financial model includes 0.9 million tonnes of inferred
 
coal production.
 
Inferred coal represents 0.6% of
 
the total production, and none
 
of this coal was included in
the estimate of reserves.
19
Economic Analysis
19.1
Assumptions, Parameters and Methods
A pre-feasibility LOM plan
 
was prepared by
 
MM&A for
 
the proposed Mon
 
Valley operations.
 
MM&A
prepared
 
mine
 
projections
 
and
 
production
 
timing
 
forecasts
 
based
 
on
 
coal
 
seam
 
characteristics.
 
Production
 
timing was
 
carried out
 
from 2032
 
to depletion
 
(exhaustion)
 
of the
 
coal reserve
 
areas,
which is projected for the year
 
2100.
 
All costs and prices are based on 2022 nominal United States
dollars.
The Mine
 
plan, productivity
 
expectations and cost
 
estimates generally reflect
 
historical performance
by
 
Coronado
 
and
 
efforts
 
have
 
been
 
made
 
to
 
adjust
 
plans
 
and
 
costs
 
to
 
reflect
 
future
 
conditions.
 
MM&A is confident
 
that the mine
 
plan and
 
financial model
 
are reasonably representative to provide
an accurate estimation of coal reserves.
ex964p2i0
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
49
Capital
 
schedules were
 
developed by
 
MM&A for
 
mine development,
 
infrastructure,
 
and on-going
capital
 
requirements
 
for
 
the
 
life
 
of the
 
mine.
 
Staffing
 
levels
 
were
 
prepared,
 
and operating
 
costs
estimated
 
by
 
MM&A.
 
MM&A
 
utilized
 
historical
 
cost
 
data
 
provided
 
by
 
Coronado
 
and
 
its
 
own
knowledge and experience to estimate direct and indirect operating
 
costs.
 
The
 
preliminary
 
feasibility
 
financial
 
model,
 
prepared
 
for
 
this
 
TRS,
 
was
 
developed
 
to
 
test
 
the
economic viability of
 
the coal reserve
 
area.
 
The results of
 
this financial model
 
are not intended
 
to
represent
 
a
 
bankable
 
feasibility
 
study,
 
required
 
for
 
financing
 
of
 
any
 
current
 
or
 
future
 
mining
operations,
 
but
 
are
 
intended
 
to
 
prove
 
the
 
economic
 
viability
 
of the
 
estimated
 
coal
 
reserves.
 
All
costs and prices are based on 2022 nominal United States dollars assuming a 2% inflation rate.
On an unlevered basis, the NPV of the project cash flows after taxes was
 
estimated for the purpose
of
 
classifying
 
coal
 
reserves.
 
The
 
project
 
cash
 
flows,
 
excluding
 
debt
 
service,
 
are
 
calculated
 
by
subtracting direct
 
and indirect
 
operating expenses
 
and capital
 
expenditures from
 
revenue.
 
Direct
costs include labor, drilling and
 
blasting, operating supplies,
 
maintenance and repairs,
 
facilities costs
for
 
materials
 
handling,
 
coal
 
preparation,
 
refuse
 
disposal,
 
coal
 
loading,
 
sampling
 
and
 
analysis
services,
 
reclamation
 
and
 
general
 
and
 
administrative
 
costs.
 
Indirect
 
costs
 
include
 
statutory
 
and
legally
 
agreed
 
upon
 
fees
 
related
 
to
 
direct
 
extraction
 
of
 
the
 
mineral.
 
The
 
indirect
 
costs
 
are
 
the
Federal
 
black
 
lung
 
tax,
 
Federal
 
reclamation
 
taxes,
 
property
 
taxes,
 
local
 
transportation
 
prior
 
to
delivery
 
at
 
rail
 
or
 
barge
 
loading
 
sites,
 
coal
 
production
 
royalties,
 
sales
 
and
 
use
 
taxes,
 
and
 
income
taxes.
 
Coronado’s historical
 
costs provided a useful reference
 
for MM&A’s
 
cost estimates.
Sales revenue is based on
 
the metallurgical coal price information provided to MM&A
 
by Coronado.
Projected
 
debt
 
service
 
is
 
excluded
 
from
 
the
 
P&L
 
and
 
cash
 
flow
 
model
 
in
 
order
 
to
 
determine
Enterprise Value.
The financial model expresses coal sales prices, operating costs, and capital expenditures in current
day
 
dollars
 
without
 
adjustment
 
for
 
inflation.
 
Capital
 
expenditures
 
and
 
reclamation
 
costs
 
are
included based
 
on engineering
 
estimates for
 
each mine
 
by year.
 
The Coronado
 
division’s
 
existing
allocations of administrative costs are
 
continued in the future projections.
Coronado will pay royalties for the various current and projected operations.
 
The royalty rates vary
by
 
mining method
 
and location.
 
The
 
royalty
 
rates
 
for
 
Mon
 
Valley
 
are estimated
 
to be
 
7% of
 
the
sales revenue.
The
 
projection
 
model
 
also
 
includes
 
consolidated
 
income
 
tax
 
calculations
 
at
 
the
 
Coronado
 
level,
incorporating statutory
 
depletion calculations, as well
 
as state income
 
taxes, and a
 
federal tax rate
of
 
21%.
 
To
 
the
 
extent
 
the
 
mine
 
generates
 
net
 
operating
 
losses
 
for
 
tax
 
purposes,
 
the
 
losses
 
are
carried over to offset future taxable
 
income.
 
The terms “cash flows” and “project cash flows” used
in this report refer to after tax
 
cash flows.
Consolidated cash flows are driven by annual sales tonnage, which grows from 0.4 million
 
tonnes in
2032 to a peak of 3.8
 
million tonnes in 2060.
 
Between years 2061
 
and 2090, sales ranges from
 
1.5
ex964p2i0
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
50
million to 2.7
 
million tonnes and between
 
years 2091-2100,
 
sales range from
 
0.4 million tonnes
 
to
1.3 million tonnes.
 
Projected consolidated
 
revenue grows
 
from $54.0 million
 
in 2032 to
 
a peak of
$917.7 million in 2060.
 
Revenue totals $37.6 billion for the project’s
 
life.
Consolidated cash flow from operations is positive throughout the projected operating period, with
the
 
exception
 
of post
 
-production
 
years,
 
due to
 
end-of-mine
 
reclamation
 
spending.
 
Consolidated
cash flow from operations
 
peaks at $374.3 million in
 
2061 and totals $9.1 billion over
 
the project’s
life.
 
Capital
 
expenditures
 
total
 
$531.2 million
 
during the
 
first
 
five
 
years
 
and $3.8
 
billion over
 
the
project’s life.
 
Coal
 
price
 
forecasts
 
for
 
coal
 
products
 
were
 
prepared
 
by
 
Coronado
 
for
 
its
 
active
 
operations
 
and
modified
 
appropriately
 
by
 
MM&A
 
for
 
its
 
greenfield
 
operations.
 
Such
 
prices
 
were
 
used
 
for
 
the
revenue input into the
 
financial model.
 
Sales variable costs such
 
as production royalties were based
upon the revenue input.
19.2
Results
The
 
pre-feasibility
 
financial
 
model,
 
prepared
 
by
 
MM&A
 
for
 
this
 
TRS,
 
was
 
developed
 
to
 
test
 
the
economic viability of
 
each coal resource
 
area.
 
The results of
 
this financial model
 
are not intended
to represent
 
a bankable feasibility
 
study,
 
as may be
 
required for
 
financing of any
 
current or future
mining operations contemplated but are intended
 
to prove the economic viability of the estimated
coal reserves.
 
Optimization of the LOM plan was outside the scope of the engagement.
Figure 19-1
 
shows the annual variance of cash costs per ton.
 
Table 19-1
 
shows LOM tonnage, P&L,
and EBITDA for each proposed Coronado mines in Mon Valley
 
.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex964p59i1
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
51
Figure 19-1:
 
Cash Costs per Tonne
As
 
shown
 
above,
 
the
 
mines’ average
 
cash
 
cost
 
ranges
 
between
 
approximately
 
$64
 
and
 
$333
 
per
tonne for most of the operating period.
Table 19-1:
 
Life-of-Mine Tonnage,
 
P&L before Tax,
 
and EBITDA ($000)
 
LOM
LOM
P&L
LOM
EBITDA
 
Tonnes
*
Pre-Tax
 
P&L
Per Tonne
EBITDA
Per Tonne
Pangburn
 
14,376
 
 
$387,034
 
 
$26.92
 
 
$998,549
 
 
$69.46
 
Fallowfield
 
72,640
 
 
$9,545,381
 
 
$131.41
 
 
$11,922,910
 
 
$164.14
 
Shaner
 
48,294
 
 
$3,824,932
 
 
$79.20
 
 
$4,964,384
 
 
$102.80
 
Consolidated PA Deep Mines
 
135,309
 
 
$13,757,346
 
 
$101.67
 
 
$17,885,844
 
 
$132.18
 
Note:
 
*Financial model includes 0.9
 
million tonnes of
 
inferred coal
 
production.
 
Inferred coal
 
represents 0.6%
of the total production, and none of this coal was included in the estimate of reserves.
As
 
shown
 
in
Table
 
19-1,
 
the
 
mines
 
show
 
positive
 
EBITDA
 
over
 
the
 
LOM.
 
Overall,
 
Coronado’s
consolidated operations show positive LOM P&L and LOM EBITDA of $13.8 billion and $17.9 billion,
respectively.
 
A summary of
 
the key
 
financial performance
 
metrics projected
 
for years
 
is provided
below in
Table 19-2
.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
52
Table 19-2:
 
Summary
 
of Mon Valley Key Financial Performance Metrics (2023-2030)
 
 
YE
12/31
2023
YE
12/31
2024
YE
12/31
2025
YE
12/31
2026
YE
12/31
2027
YE
12/31
2028
YE
12/31
2029
YE
12/31
2030
Remaining
 
Total
LOM
Average
ROM Production Tonnes
198.4
-
-
-
-
-
-
-
-
2.9
Yield
68.19%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
68.19%
Saleable Production Tonnes
*
135.3
-
-
-
-
-
-
-
-
2.0
 
Thermal Tonnes
-
-
-
-
-
-
-
-
-
-
Domestic Met Tonnes
89.3
-
-
-
-
-
-
-
-
1.3
Export Met Tonnes
46.0
-
-
-
-
-
-
-
-
0.7
 
Total Saleable Tonnes
135.3
-
-
-
-
-
-
-
-
2.0
 
Cash Costs per Tonne:
Mining Costs
$100.61
$-
$-
$-
$-
$-
$-
$-
$-
$100.59
Processing and Transport
$37.98
$-
$-
$-
$-
$-
$-
$-
$-
$37.98
Sales Related Costs
$1.73
$-
$-
$-
$-
$-
$-
$-
$-
$1.73
G&A
$5.42
$-
$-
$-
$-
$-
$-
$-
$-
$5.42
 
Total Cash Costs
$145.74
$-
$-
$-
$-
$-
$-
$-
$-
$145.72
 
EBITDA per Tonne
$131.90
$-
$-
$-
$-
$-
$-
$-
$-
$131.93
 
Expansion CapEx ($M)
$37.40
$-
$-
$-
$-
$-
$5.53
$31.87
$-
$-
Maintenance CapEx ($M)
$3,761.87
$-
$-
$-
$-
$-
$-
$-
$36.16
$53.22
 
Total CapEx
$3,799.27
$1.02
$-
$-
$-
$-
$5.53
$31.87
$36.16
$53.22
●
Financial model includes 0.9 million tonnes of inferred coal production.
 
Inferred coal represents 0.6% of the total
production, and none of this coal was included in the estimate of reserves.
After-Tax
 
Cash Flows
 
were developed
 
in order
 
to calculate
 
the NPV
 
for
 
this Property.
 
The NPV
 
is
estimated to be $168.3 million at a discount
 
rate of 10.0%.
 
A summary of the Mon Valley after
 
-tax
cash flow is shown in
Table 19-3
.
Table 19-3:
 
Project Cash Flow Summary (000)
*
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
Total
2027
2028
2029
2030
2031
Production & Sales tonnes
135,311
-
-
-
-
-
Total Revenue
$37,567,900
$-
$-
$-
$-
$-
EBITDA
$12,956,210
$(388)
$(388)
$(388)
$(388)
$(388)
Net Income
$5,500,454
$(388)
$(388)
$(388)
$(388)
$(388)
Net Cash Provided by Operating Activities
$9,101,755
$(388)
$(388)
$(388)
$(388)
$(328)
Purchases of Property, Plant, and
 
Equipment
$(3,799,269)
$-
$(5,533)
$(31,868)
$(36,156)
$(233,778)
Net Cash Flow
$5,302,486
$(388)
$(5,921)
$(32,256)
$(36,544)
$(234,106)
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2032
2033
2034
2035
2036
2037
Production & Sales tonnes
399
1,810
1,875
1,958
2,029
2,030
Total Revenue
$54,019
$249,974
$264,268
$281,660
$297,887
$304,147
EBITDA
$25,792
$134,660
$143,768
$156,696
$168,610
$172,267
Net Income
$(55,860)
$50,305
$57,801
$63,866
$62,105
$73,365
Net Cash Provided by Operating Activities
$20,744
$112,463
$139,070
$147,100
$143,903
$154,203
Purchases of Property, Plant, and
 
Equipment
$(223,890)
$(6,093)
$(1,522)
$(23,061)
$(19,766)
$(224,451)
Net Cash Flow
$(203,146)
$106,370
$137,548
$124,039
$124,137
$(70,247)
 
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
53
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2038
2039
2040
2041
2042
2043
Production & Sales tonnes
2,062
1,960
1,762
2,366
1,804
1,724
Total Revenue
$315,229
$305,758
$280,640
$384,512
$299,179
$291,805
EBITDA
$178,445
$166,211
$140,888
$208,852
$140,775
$133,692
Net Income
$57,967
$72,886
$45,385
$92,177
$64,942
$53,969
Net Cash Provided by Operating Activities
$165,161
$154,094
$130,479
$163,610
$106,491
$111,512
Purchases of Property, Plant, and
 
Equipment
$(202,332)
$(18,063)
$(15,711)
$(22,144)
$(8,827)
$(14,141)
Net Cash Flow
$(37,170)
$136,031
$114,769
$141,466
$97,664
$97,370
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2044
2045
2046
2047
2048
2049
Production & Sales tonnes
1,717
1,641
1,719
1,657
1,582
1,704
Total Revenue
$296,479
$289,255
$309,181
$304,039
$296,312
$325,698
EBITDA
$135,584
$128,438
$141,700
$136,176
$128,554
$149,022
Net Income
$67,285
$78,524
$86,380
$81,215
$75,423
$86,668
Net Cash Provided by Operating Activities
$115,188
$109,995
$111,937
$112,263
$106,871
$118,353
Purchases of Property, Plant, and
 
Equipment
$(106,672)
$(33,173)
$(3,378)
$(5,687)
$(21,727)
$(45,062)
Net Cash Flow
$8,515
$76,822
$108,559
$106,575
$85,144
$73,291
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2050
2051
2052
2053
2054
2055
Production & Sales tonnes
1,656
1,732
1,702
1,596
1,642
1,750
Total Revenue
$322,894
$344,510
$345,451
$330,631
$347,164
$377,485
EBITDA
$144,852
$159,462
$158,323
$145,127
$155,737
$176,479
Net Income
$83,039
$106,381
$104,840
$90,665
$96,667
$115,492
Net Cash Provided by Operating Activities
$120,921
$126,371
$126,005
$119,262
$124,313
$138,665
Purchases of Property, Plant, and
 
Equipment
$(25,998)
$(4,218)
$(20,921)
$(39,520)
$(28,042)
$(37,598)
Net Cash Flow
$94,923
$122,153
$105,084
$79,742
$96,271
$101,067
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2056
2057
2058
2059
2060
2061
Production & Sales tonnes
1,751
2,609
3,576
3,732
3,846
3,762
Total Revenue
$385,399
$586,004
$819,598
$872,775
$917,689
$916,057
EBITDA
$180,413
$271,312
$391,320
$425,108
$454,572
$448,794
Net Income
$139,507
$127,958
$209,809
$227,665
$251,397
$234,738
Net Cash Provided by Operating Activities
$160,731
$227,264
$308,925
$347,214
$369,575
$374,330
Purchases of Property, Plant, and
 
Equipment
$(549,006)
$(91,928)
$(36,973)
$(45,463)
$(22,284)
$(131,772)
Net Cash Flow
$(388,274)
$135,335
$271,952
$301,751
$347,291
$242,558
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2062
2063
2064
2065
2066
2067
Production & Sales tonnes
3,488
3,390
3,466
3,397
2,961
2,826
Total Revenue
$866,529
$859,453
$896,756
$896,840
$797,498
$776,640
EBITDA
$406,027
$398,694
$424,167
$429,339
$389,140
$382,069
Net Income
$203,176
$262,307
$274,392
$274,792
$235,580
$226,904
Net Cash Provided by Operating Activities
$352,593
$331,050
$333,667
$341,553
$322,289
$312,496
Purchases of Property, Plant, and
 
Equipment
$(58,035)
$(25,972)
$(64,621)
$(60,161)
$(120,574)
$(57,818)
Net Cash Flow
$294,558
$305,078
$269,045
$281,391
$201,715
$254,678
 
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
54
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2068
2069
2070
2071
2072
2073
Production & Sales tonnes
2,479
2,318
2,289
1,438
1,988
1,993
Total Revenue
$695,232
$663,381
$668,340
$428,531
$604,475
$618,406
EBITDA
$345,064
$315,895
$324,744
$177,919
$303,204
$313,068
Net Income
$200,677
$180,616
$183,214
$102,106
$185,575
$200,522
Net Cash Provided by Operating Activities
$290,478
$265,928
$264,648
$126,035
$207,165
$242,028
Purchases of Property, Plant, and
 
Equipment
$(118,193)
$(38,552)
$(41,672)
$(26,538)
$(44,402)
$(30,383)
Net Cash Flow
$172,285
$227,376
$222,976
$99,497
$162,763
$211,645
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2074
2075
2076
2077
2078
2079
Production & Sales tonnes
1,822
2,098
2,055
2,107
1,883
2,129
Total Revenue
$576,706
$614,741
$614,611
$642,871
$586,223
$676,320
EBITDA
$282,323
$306,812
$304,834
$325,855
$282,672
$345,761
Net Income
$178,585
$209,539
$202,684
$211,767
$179,763
$230,583
Net Cash Provided by Operating Activities
$227,691
$232,044
$237,019
$247,117
$225,397
$251,932
Purchases of Property, Plant, and
 
Equipment
$(3,360)
$(3,428)
$(42,925)
$(75,556)
$(16,116)
$(6,493)
Net Cash Flow
$224,330
$228,617
$194,094
$171,561
$209,281
$245,439
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2080
2081
2082
2083
2084
2085
Production & Sales tonnes
1,937
1,723
2,242
1,568
2,285
1,637
Total Revenue
$627,878
$570,149
$756,717
$540,176
$803,092
$587,274
EBITDA
$307,130
$261,187
$391,089
$241,080
$421,465
$261,759
Net Income
$201,018
$156,255
$247,475
$139,739
$281,600
$160,070
Net Cash Provided by Operating Activities
$240,316
$207,078
$272,041
$211,121
$285,491
$228,402
Purchases of Property, Plant, and
 
Equipment
$(25,860)
$(72,719)
$(39,361)
$(12,940)
$(20,396)
$(34,296)
Net Cash Flow
$214,456
$134,359
$232,679
$198,181
$265,095
$194,106
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2086
2087
2088
2089
2090
2091
Production & Sales tonnes
1,982
1,477
1,857
1,616
1,993
1,305
Total Revenue
$725,512
$551,606
$707,457
$628,246
$790,874
$528,487
EBITDA
$356,300
$233,497
$334,352
$278,449
$389,504
$199,352
Net Income
$224,911
$128,018
$209,340
$168,393
$251,821
$107,463
Net Cash Provided by Operating Activities
$252,946
$200,997
$235,620
$222,633
$275,062
$188,238
Purchases of Property, Plant, and
 
Equipment
$(42,736)
$(61,764)
$(27,589)
$(31,659)
$(4,613)
$(38,355)
Net Cash Flow
$210,209
$139,233
$208,030
$190,974
$270,449
$149,882
 
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2092
2093
2094
2095
2096
2097
Production & Sales tonnes
1,637
1,612
1,747
1,355
1,731
1,752
Total Revenue
$676,274
$679,478
$751,249
$594,733
$775,168
$800,781
EBITDA
$301,607
$299,832
$348,917
$215,004
$356,524
$378,911
Net Income
$176,267
$169,679
$213,755
$117,501
$219,452
$235,930
Net Cash Provided by Operating Activities
$211,547
$229,125
$256,552
$190,242
$246,204
$284,008
Purchases of Property, Plant, and
 
Equipment
$(81,778)
$(76,560)
$(4,993)
$(5,093)
$(47,001)
$-
Net Cash Flow
$129,769
$152,566
$251,558
$185,149
$199,203
$284,008
 
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ex964p19i1
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
55
 
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
YE12/31
 
2098
2099
2100
2101
2102
2103
Production & Sales tonnes
1,387
916
393
-
-
-
Total Revenue
$646,856
$435,993
$190,649
$-
$-
$-
EBITDA
$266,452
$177,489
$71,896
$-
$-
$-
Net Income
$157,157
$132,037
$52,032
$-
$-
$-
Net Cash Provided by Operating Activities
$224,663
$61,085
$(105,016)
$-
$-
$-
Purchases of Property, Plant, and
 
Equipment
$-
$-
$-
$-
$-
$-
Net Cash Flow
$224,663
$61,085
$(105,016)
$-
$-
$-
●
Financial model includes 0.9 million tonnes of inferred coal production.
 
Inferred coal represents 0.6% of the total
production, and none of this coal was included in the estimate of reserves.
19.3
Sensitivity
Sensitivity
 
of the
 
NPV
 
results
 
to
 
changes
 
in
 
the
 
key
 
drivers
 
is presented
 
in the
 
chart below.
 
The
sensitivity study shows
 
the NPV at
 
the 10.0% discount rate
 
when Base Case sales
 
prices, operating
costs, and capital costs are increased and decreased in increments
 
of 5% within a +/- 15% range.
Figure 19-2:
 
Sensitivity of NPV
As shown, NPV is quite sensitive to changes in sales price and operating cost estimates, and slightly
sensitive to changes in capital cost estimates.
ex964p2i0
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
56
20
Adjacent Properties
20.1
Information Used
No Proprietary information associated with neighboring properties
 
was used as part of this study.
21
Other Relevant Data and Information
MM&A
 
performed
 
a
 
previous
 
audit of
 
the
 
Property
 
in
 
2017 for
 
Coronado
 
based
 
on
 
SEC
 
Industry
Guide
 
7
 
standards.
 
MM&A
 
has
 
subsequently
 
conducted
 
Joint
 
Ore
 
Reserve
 
Committee
 
(
JORC
)
compliant resource and reserve
 
assessments of the
 
Mon Valley assets as
 
of:
 
(1) December 31,
 
2017,
(2) December 31, 2020, and (3) December 31, 2021.
 
By assignment, the JORC assessment included
a
 
preliminary
 
feasibility
 
level
 
study
 
of
 
the
 
subject
 
coal
 
reserves,
 
encompassing
 
detailed
 
mine
planning and cost analysis
 
through depletion of Mon
 
Valley’s
 
JORC-compliant coal reserves.
 
MM&A
utilized these
 
former preliminary
 
feasibility
 
studies as
 
the basis
 
of an
 
updated
 
study which
 
meets
those standards set forth by the JORC Code and SEC.
22
Interpretation and Conclusions
22.1
Conclusion
Sufficient data
 
has been obtained
 
through various
 
exploration and
 
sampling programs
 
and mining
operations
 
to
 
support
 
the
 
geological
 
interpretations
 
of
 
seam
 
structure
 
and
 
thickness
 
for
 
coal
horizons
 
situated
 
on the
 
Property.
 
The data
 
is of
 
sufficient
 
quantity
 
and reliability
 
to
 
reasonably
support the coal resource and coal reserve estimates
 
in this TRS.
The
 
geological
 
data
 
and
 
preliminary
 
feasibility
 
study,
 
which
 
consider
 
mining
 
plans,
 
revenue,
 
and
operating
 
and
 
capital
 
cost
 
estimates
 
are
 
sufficient
 
to
 
support
 
the
 
classification
 
of
 
coal
 
reserves
provided herein.
This geologic evaluation conducted in conjunction with the preliminary feasibility study is sufficient
to conclude that the
 
134.4 Mt of marketable
 
underground coal reserves
 
identified on the Property
are
 
economically
 
mineable under
 
reasonable
 
expectations
 
of market
 
prices for
 
metallurgical
 
coal
products, estimated operation costs,
 
and capital expenditures.
22.2
Risk Factors
Risks have
 
been identified
 
for
 
operational,
 
technical and
 
administrative
 
subjects addressed
 
in the
Pre-Feasibility
 
Study.
 
A risk
 
matrix has
 
been constructed
 
to present
 
the risk
 
levels for
 
all the
 
risk
factors identified and quantified in
 
the risk assessment process.
 
The risk matrix and
 
risk assessment
process
 
are
 
modeled
 
to
 
that
 
presented
 
in
 
the
 
Australian
 
and
 
New
 
Zealand
 
Standard
 
on
 
Risk
Management (AS/NZS 4360).
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
57
The
 
purpose
 
of
 
the
 
characterization
 
of
 
the
 
project
 
risk
 
components
 
is
 
to
 
inform
 
the
 
project
stakeholders
 
of
 
key
 
aspects
 
of
 
the
 
Coronado
 
projects
 
that
 
can
 
be
 
impacted
 
by
 
events
 
whose
consequences can affect
 
the success of the venture.
 
The significance of an impacted
 
aspect of the
operation
 
is
 
directly
 
related
 
to
 
both
 
the
 
probability
 
of
 
occurrence
 
and
 
the
 
severity
 
of
 
the
consequences.
 
The initial risk for
 
a risk factor
 
is herein defined
 
as the risk level
 
after the potential
impact
 
of
 
the
 
risk
 
factor
 
is
 
addressed
 
by
 
competent
 
and
 
prudent
 
management
 
utilizing
 
control
measures readily available.
 
Residual risk for a risk factor is herein defined as the risk
 
level following
application
 
of
 
special
 
mitigation
 
measures
 
if
 
management
 
determines
 
that
 
the
 
initial
 
risk
 
level
 
is
unacceptable.
 
Initial risk and residual risk can be quantified numerically,
 
derived by the product of
values assigned to probability and consequence ranging from very low risk to very high risk.
 
The probability and consequence
 
parameters are subjective numerical estimates made
 
by practiced
mine engineers and
 
managers.
 
Both are
 
assigned values
 
from 1 to
 
5 for which
 
the value
 
1 represents
the
 
lowest
 
probability
 
and least
 
consequence,
 
and the
 
value
 
5 represents
 
the highest
 
probability
and greatest
 
consequence.
 
The products, which define
 
the Risk Level,
 
are classified from
 
very low
to very high.
 
Risk Level Table
 
(R = P x C)
Risk Level (R)
Very Low (1 to 2)
Low (3 to 5)
Moderate (6 to 11)
High (12 to 19)
Very High (20 to 25)
Risk aspects
 
identified and
 
evaluated
 
during this
 
assignment total
 
13.
 
No residual
 
risks are
 
rated
Very High.
 
Four (4) residual risks are rated High.
 
Six (6) of the risk aspects could be associated with
Moderate residual risk.
 
Three (3) of the risk aspects
 
were attributed Low or Very Low residual risks.
 
22.2.1
Governing Assumptions
The listing of the aspects is
 
not presumed to be exhaustive.
 
Instead that listing is
 
presented based
on the experiences of the contributors to the TRS.
 
1.
The probability and consequence ratings are subjectively assigned, and it is assumed that
this subjectivity reasonably reflects the condition of the active and projected mine
operations.
2.
The Control Measures shown in the matrices presented in this chapter are
 
not exhaustive.
 
They represent a condensed collection of activities that the author of the risk assessment
section has observed to be effective in coal mining scenarios.
 
3.
Mitigation Measures listed for each
 
risk factor of the operation are not exhaustive.
 
The
measures listed, however,
 
have been observed by the author to be effective.
 
4.
The monetary values used in ranking the consequences are generally-accepted quantities
 
for
the coal mining industry.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
58
22.2.2
Limitations
The risk assessment proposed in
 
this report is subject to
 
the limitations of the information currently
collected, tested, and interpreted
 
at the time of the writing of the report.
22.2.3
Methodology
The
 
numerical
 
quantities
 
(i.e.,
 
risk
 
levels)
 
attributable
 
to
 
either
 
“initial”
 
or
 
“residual”
 
risks
 
are
derived
 
by the
 
product
 
of values
 
assigned to
 
probability
 
and consequence
 
ranging
 
from
 
very low
risk to very high risk.
R = P x C
Where:
R = Risk Level
P = Probability of Occurrence
C = Consequence of Occurrence
The Probability (P) and
 
Consequence (C) parameters recited in the
 
formula are subjective numerical
estimates
 
made
 
by
 
practiced
 
mine
 
engineers
 
and
 
managers.
 
Both
 
P
 
and
 
C
 
are
 
assigned
 
integer
values
 
ranging
 
from
 
1
 
to
 
5
 
for
 
which
 
the
 
value
 
1
 
represents
 
the
 
lowest
 
probability
 
and
 
least
consequence,
 
and the
 
value 5
 
represents
 
the highest
 
probability
 
and greatest
 
consequence.
 
The
products (R = P x C) which define the Risk Level, are
 
thereafter classified from very low to very high.
Risk Level Table
Risk Level (R)
Very Low (1 to 2)
Low (3 to 5)
Moderate (6 to 11)
High (12 to 19)
Very High (20 to 25)
Very
 
high
 
initial
 
risks
 
are
 
considered
 
to
 
be
 
unacceptable
 
and
 
require
 
corrective
 
action
 
well
 
in
advance of project
 
development.
 
In short,
 
measures must be
 
applied to reduce
 
very high initial
 
risks
to a tolerable level.
 
As
 
shown
 
and
 
discussed
 
above,
 
after
 
taking
 
into
 
account
 
the
 
operational,
 
technical,
 
and
administrative actions that have been
 
applied or
 
are available for action
 
when required, the
 
residual
risk can be determined.
 
The residual risk provides
 
a basis for the
 
management team to determine
if the residual risk
 
level is acceptable or tolerable.
 
If the risk level
 
is determined to be unacceptable,
further actions should be considered to reduce the residual risk to acceptable or tolerable
 
levels to
provide justification for continuation
 
of the proposed operation.
22.2.4
Development of the Risk Matrix
Risks have
 
been identified for
 
the technical,
 
operational, and
 
administrative
 
subjects addressed
 
in
the
 
TRS.
 
The
 
risk
 
matrix
 
and
 
risk
 
assessment
 
process
 
are
 
modeled
 
to
 
that
 
presented
 
in
 
the
Australian and New Zealand Standard on Risk Management
 
(AS/NZS 4360).
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
59
22.2.4.1
Probability Level Table
Table 22-1:
 
Probability Level Table
Category
Probability Level (P)
1
Remote
Not likely to occur except
 
in exceptional circumstances.
<10%
2
Unlikely
Not likely to occur; small in degree.
10 - 30%
3
Possible
Capable of occurring.
30 - 60%
4
Likely
High chance of occurring in most circumstances.
60 - 90%
5
Almost Certain
Event is expected under
 
most circumstances; impossible to
 
avoid.
>90%
The lowest rated probability of occurrence is assigned the value of 1 and described as remote, with
a
 
likelihood
 
of
 
occurrence
 
of
 
less
 
than
 
2
 
percent.
 
Increasing
 
values
 
are
 
assigned
 
to
 
each
 
higher
probability
 
of occurrence,
 
culminating
 
with the
 
value
 
of 5
 
assigned to
 
incidents considered
 
to
 
be
almost certain to occur.
22.2.4.2
Consequence Level Table
Table 22-2
 
lists the consequence levels.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
60
Table 22-2:
 
Consequence Level Table
Correlation of Events in Key Elements of the Project Program
 
to Event Severity Category
Category
Severity of
the Event
Financial Impact
of the Event
Unplanned
Loss of
Production
(Impact on
Commercial
Operations)
Events Impacting
on the Environment
Events Affecting the Program's
Social and Community
Relations
Resultant Regulatory /
Sovereign Risk
Events Affecting Occupational Health &
Safety
1
Insignificant
< USD $0.5
million
≤ 12 hours
Insignificant loss of
habitat; no
irreversible effects
on water,
 
soil and
the environment.
Occasional nuisance impact on
travel.
-
 
Event recurrence avoided by corrective
action through established procedures
(Engineering, guarding, training).
2
Minor
USD $0.5 million
to $2.0 million
≤ 1 day
No significant
change to species
populations; short-
term reversible
perturbation to
ecosystem function.
Persistent nuisance impact on
travel.
 
Transient adverse media
coverage.
-
 
First aid – lost time.
 
Event recurrence
avoided by corrective action through
established procedures.
3
Moderate
USD $2.0 million
to $10.0 million
≤ 1 week
Appreciable change
to species
population;
medium-term (≤10
years) detriment to
ecosystem function.
Measurable impact on travel
and water/air quality.
 
Significant adverse media
coverage / transient public
outrage.
Uncertainty securing or
retaining essential
approval / license.
Medical Treatment –
permanent
incapacitation.
 
Avoiding event
recurrence requires modification to
established corrective action procedures
.
Change to regulations
(tax; bonds; standards).
4
Major
USD $10.0
million to $50.0
million
1 to 2 weeks
Change to species
population
threatening
viability; long-term
(>10 years)
detriment to
ecosystem function.
Long-term, serious impact on
travel and use of water
resources; degradation of air
quality; sustained and effective
public opposition.
Suspension / long-delay
in securing essential
approval / license.
Fatality.
 
Avoiding event recurrence
requires modification to established
corrective action procedures and staff
retraining.
Change to laws (tax;
bonds; standards).
5
Critical
>USD $50.0
million
>1 month
Species extinction;
irreversible damage
to ecosystem
function.
Loss of social license.
Withdraw / failure to
secure essential
approval / license.
Multiple fatalities.
 
Avoiding event
recurrence requires major overhaul of
policies and procedures.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
61
The
 
lowest
 
rated
 
consequence
 
is
 
assigned
 
the
 
value
 
of
 
1
 
and
 
is
 
described
 
as
 
Insignificant
Consequence,
 
parameters
 
of
 
which
 
include
 
non-reportable
 
safety
 
incidents
 
with
 
zero
 
days
 
lost
accidents, no environmental damage, loss of production or systems for less than
 
one week and cost
of
 
less
 
than
 
USD
 
$0.5
 
million.
 
Increasing
 
values
 
are
 
assigned
 
to
 
each
 
higher
 
consequence,
culminating with the value of
 
5 assigned to critical consequences, the
 
parameters of which include
multiple-fatality
 
accidents,
 
major
 
environmental
 
damage,
 
and
 
loss
 
of
 
production
 
or
 
systems
 
for
longer than one month and cost of greater than USD $50.0 million.
Composite Risk Matrix R = P x C and Color-Code Convention
The risk level, defined as the
 
product of probability of occurrence and consequence, ranges in
 
value
from
 
1 (lowest
 
possible risk)
 
to
 
25 (maximum
 
risk level).
 
The
 
values
 
are color-coded
 
to facilitate
identification of the highest risk aspects.
Table 22-3:
 
Risk Matrix
P x C = R
Consequence (C)
Insignificant
Minor
Moderate
Major
Critical
1
2
3
4
5
Probability Level (P)
Remote
1
1
2
3
4
5
Unlikely
2
2
4
6
8
10
Possible
3
3
6
9
12
15
Likely
4
4
8
12
16
20
Almost
Certain
5
5
10
15
20
25
22.2.5
Categorization of Risk Levels and Color Code Convention
Very
 
high
 
risks
 
are
 
considered
 
to
 
be
 
unacceptable
 
and
 
require
 
corrective
 
action.
 
Risk
 
reduction
measures must be applied to reduce very high risks to a tolerable level.
22.2.6
Description of the Coal Property
The Mon Valley Reserve (including Pangburn, Shaner and Fallowfield Areas) is located
 
in Allegheny,
Washington,
 
and Westmoreland
 
Counties, Pennsylvania.
 
Mon Valley
 
underground operations
 
are
projected
 
to
 
commence
 
in
 
2032
 
at
 
the
 
Mon
 
Valley
 
Complex
 
in
 
the
 
large
 
Upper
 
Freeport
 
seam
reserve area.
 
Three mines are planned,
 
and each will
 
utilize continuous mining methods.
 
The initial
operation is designated as the Pangburn Mine;
 
subsequently, the Shaner Mine is projected for 2038
and followed
 
by the
 
Fallowfield Mine
 
in 2057.
 
The operations
 
are projected
 
to utilize
 
continuous
mining production
 
sections.
 
The method
 
provides
 
continuity,
 
preserving skilled
 
work groups
 
and
enabling effective utilization of production equipment.
 
The Upper Freeport seam
 
is below drainage
and therefore
 
all mines will be accessed with slopes and shafts.
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
62
22.2.7
Summary of Residual Risk Ratings
Each
 
risk factor
 
is numbered,
 
and
 
a
 
risk level
 
for
 
each
 
is determined
 
by
 
multiplying
 
the
 
assigned
probability by
 
the assigned
 
consequence.
 
The risk
 
levels are
 
plotted
 
on a
 
risk matrix
 
to provide
 
a
composite
 
view
 
of
 
the
 
Coronado
 
risk
 
profile.
 
The
 
average
 
risk
 
level
 
is
 
8.4,
 
which
 
is
 
defined
 
as
Moderate.
Table 22-4:
 
Risk Assessment Matrix
 
 
 
 
 
 
 
 
 
Consequence
Critical
>$50 MM
9, 10
 
 
 
 
 
Major
$10-50MM
 
4
1, 2, 3
6
 
 
Moderate
$2-10 MM
 
12
 
 
 
 
Minor
$0.5-$2 MM
 
 
7, 13
5
8
 
Low
<$0.5 MM
 
 
11
 
 
 
 
<10%
10-30%
30-60%
60-90%
>90%
 
Remote
Unlikely
Possible
Likely
Almost
Certain
22.2.8
Risk Factors
A
 
high-level
 
approach
 
is
 
utilized
 
to
 
characterize
 
risk
 
factors
 
that
 
are
 
generally
 
similar
 
across
 
a
number of
 
the active
 
and proposed
 
mining operations.
 
Risk factors
 
that
 
are
 
unique to
 
a specific
operation or are particularly noteworthy are
 
addressed individually.
22.2.8.1
Geological and Coal Resource
Coal
 
mining
 
is
 
accompanied
 
by
 
risk
 
that,
 
despite
 
exploration
 
efforts,
 
mining
 
areas
 
will
 
be
encountered
 
where geological
 
conditions render
 
extraction
 
of the
 
resource to
 
be uneconomic,
 
or
that coal quality characteristics disqualify the product for sale into
 
target markets.
To
 
illustrate these points, the Upper Freeport coal seam deposits at Mon Valley are examined.
 
The
coal
 
is
 
deposited
 
in
 
large,
 
elliptical
 
pods.
 
During
 
deposition,
 
the
 
raised
 
peat
 
deposits
 
were
surrounded
 
by
 
areas
 
void
 
of
 
peat
 
and
 
deposited
 
instead
 
with
 
dirt,
 
clay,
 
and
 
stream
 
channels.
 
Consequently,
 
the perimeter
 
of the
 
peat,
 
and consequent
 
coal
 
deposits may
 
contain
 
significantly
higher concentration of ash
 
and sulfur, and reduced product yield.
 
The perimeter deposits
 
may also
be
 
affected
 
by
 
immediate
 
roof
 
and
 
floor
 
conditions
 
that
 
adversely
 
affect
 
mining
 
cost
 
and
productivity.
 
Meandering sandstone
 
channels may
 
reduce coal
 
seam thickness by
 
scouring action
at the top of the coal seam and support the migration of sulfur to the Upper Freeport seam.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
63
Offsetting the geological and
 
coal resource risk
 
are the massive
 
size of the
 
controlled property which
allows
 
large
 
areas
 
to
 
be
 
mined
 
in
 
the
 
three
 
designated
 
mine
 
areas
 
sufficiently
 
away
 
from
 
areas
where coal quality
 
and mineability
 
are less
 
favorable.
 
In addition,
 
the mines
 
are designed to
 
operate
with
 
multiple
 
production
 
sections,
 
which
 
lessens
 
the
 
immediate
 
impact
 
when
 
one
 
section
encounters difficulties.
 
The large reserve areas also
 
provide a mitigation strategy
 
of developing an
additional
 
(spare)
 
section
 
at
 
each
 
mine
 
which
 
can
 
be
 
activated
 
when
 
adverse
 
conditions
 
are
encountered,
 
thereby
 
maintaining
 
consistent
 
production
 
and quality.
 
The
 
spare
 
section requires
additional mine extension cost but increases flexibility and performance consistency.
Table 22-5:
 
Geological and Coal Resource Risk Assessment (Risks 1 and 2)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Recoverable coal tonnes
recognized to be
significantly less than
previously estimated.
Reserve base is adequate to
serve market commitments
and respond to opportunities
for many years.
 
Local
adverse conditions may
increase frequency and cost of
production unit relocations.
Previous and ongoing
exploration and extensive
regional mining history
provide a high level of
confidence of coal seam
correlation, continuity of the
coal seams, and coal
resource tonnes.
4
4
16
Optimize mine plan
to increase resource
recovery; develop
mine plan to provide
readily available
alternate mining
locations to sustain
expected production
level.
3
4
12
Coal quality locally
proves to be lower than
initially projected.
If uncontrolled, production and
sale of coal that is out of
specification can result in
rejection of deliveries,
cancellation of coal sales
agreements and damage to
reputation.
Exploration and vast
experience and history in
local coal seams provide
confidence in coal quality;
limited excursions can be
managed with careful
product segregation and
blending.
3
5
15
Develop mine plan
to provide readily
available alternate
mining locations to
sustain expected
production level;
modify coal sales
agreements to
reflect coal quality.
3
4
12
22.2.8.2
Environmental
Water
 
quality and
 
other permit
 
requirements
 
are subject
 
to modification
 
and such
 
changes could
have a
 
material impact on
 
the capability of
 
the operator
 
to meet modified
 
standards or
 
to receive
new permits and modifications
 
to existing permits.
 
Permit protests
 
may result in delays
 
or denials
to permit applications.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
64
Environmental standards and permit requirements have evolved significantly over the
 
past 50 years
and
 
to-date,
 
mining
 
operators
 
and
 
regulatory
 
bodies
 
have
 
been
 
able
 
to
 
adapt
 
successfully
 
to
evolving environmental requirements.
The Residual
 
Risk has is
 
projected to
 
be slightly higher
 
for the
 
PA
 
reserves due
 
to the
 
proximity of
the rivers and the residual environmental
 
complaints, in the vicinity, left
 
from mining in the past.
Table 22-6:
 
Environmental (Risks 3 and 4)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Environmental
performance standards
are modified in the future.
Delays in receiving new
permits and modifications to
existing permits; cost of testing
and treatment of water and
soils
Work with regulatory
agencies to understand and
influence final standards;
implement testing,
treatment and other actions
to comply with new
standards.
3
4
12
Modify mining and
reclamation plans to
improve compliance
with new standards
while reducing cost
of compliance.
3
4
12
New permits and permit
modifications are
increasingly delayed or
denied.
Interruption of production and
delayed implementation of
replacement production from
new mines.
Comply quickly with testing,
treatment and other actions
required; continue excellent
compliance performance
within existing permits.
2
4
8
Establish and
maintain close and
constructive working
relationships with
regulatory agencies,
local communities
and community
action groups.
2
4
8
22.2.8.3
Regulatory Requirements
Federal
 
and
 
state
 
health
 
and
 
safety
 
regulatory
 
agencies
 
occasionally
 
amend
 
mine
 
laws
 
and
regulations.
 
The impact is
 
industry-wide.
 
Mining operators and regulatory agencies have been
 
able
to adapt successfully to evolving health and safety requirements.
Table 22-7:
 
Regulatory Requirements (Risk 5)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Federal and state mine
safety and health
regulatory agencies
amend mine laws and
regulations.
Cost of training, materials,
supplies and equipment;
modification of mine
examination and production
procedures; modification of
mining plans.
Participate in hearings and
workshops when possible to
facilitate understanding and
implementation; work
cooperatively with agencies
and employees to facilitate
implementation of new laws
and regulations.
4
3
12
Familiarity and
experience with new
laws and regulations
results in reduced
impact to operations
and productivity and
improved supplies
and equipment
options.
4
2
8
22.2.8.4
Market and Transportation
Most of the current and future production is expected to be directed to domestic and international
metallurgical markets.
 
Historically the metallurgical markets
 
have been cyclical and highly volatile.
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
65
The Mon Valley business plan assumes that 75 percent of production can be sold into the favorably
priced
 
metallurgical
 
market.
 
The mining
 
plan must
 
minimize
 
exposure
 
to the
 
perimeter reserves
where quality may not be suitable for the market plan and be flexible to manage exposure to
 
areas
where coal quality fails to meet metallurgica
 
l
 
standards.
Table 22-8:
 
Market and Transportation (Risks 6 and 7)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Volatile coal prices drop
precipitously.
Loss of revenue adversely
affects profitability; reduced
cash flow may disrupt capital
expenditures plan.
Cost control measures
implemented; capital
spending deferred.
4
5
20
High-cost operations
closed, and
employees
temporarily
furloughed.
4
4
16
Coal quality at Mon
Valley Upper Freeport
mines is not adequate to
support 100 percent
metallurgical sales.
Reduced revenue from a
percentage of thermal sales
jeopardizes financial
performance and expectations.
Lower preparation plant
gravities for ash and sulfur
reduction; segregate lower
quality coal when possible
and manage shipped
quality by blending.
3
5
15
Adjust mine plan
to keep minimize
exposure to
perimeter coal and
sandstone channels;
provide spare
section to sustain
production and
quality when low
quality areas are
encountered.
3
2
6
Occasional delay or interruption of rail,
 
river and terminals service may be expected.
 
The operator
can
 
possibly
 
minimize
 
the
 
impact
 
of
 
delays
 
by
 
being
 
a
 
preferred
 
customer
 
by
 
fulfilling
 
shipment
obligations promptly and maintaining close working relationships.
Table 22-9:
 
Market and Transportation (Risk 8)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Rail or river transport is
delayed; storage and
shipping access at river
and ocean terminals is not
available.
Fulfillment of coal sales
agreements delayed; limited
coal storage at mines may
increase cost of rehandling;
production may be temporarily
idled.
Provide adequate storage
capacity at mines;
coordinate continuously with
railroad and shipping
companies to respond
quickly and effectively to
changing circumstances.
5
3
15
Provide back-up
storage facility along
with personnel,
equipment and
rehandle plan to
sustain production
and fulfill sales
obligations timely.
5
2
10
22.2.8.5
Mining Plan
Occupational health and
 
safety risks are inherent
 
in mining
 
operations.
 
Comprehensive training and
retraining
 
programs,
 
internal
 
safety
 
audits
 
and
 
examinations,
 
regular
 
mine
 
inspections,
 
safety
meetings, along
 
with support
 
of trained
 
fire brigades
 
and mine
 
rescue teams
 
are among
 
activities
that
 
greatly
 
reduce
 
accident
 
risks.
 
Employee
 
health monitoring
 
programs
 
coupled
 
with dust
 
and
noise monitoring and abatement reduce health risks to miners.
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
66
As underground mines are developed and
 
extended, observation of geological, hydrogeological and
geotechnical
 
conditions
 
lead
 
to
 
modification
 
of
 
mine
 
plans
 
and
 
procedures
 
to
 
enable
 
safe
 
work
within the mine environments.
Highlighted
 
below
 
are
 
selected
 
examples
 
of
 
safety
 
and
 
external
 
factors
 
relevant
 
to
 
Coronado
operations.
22.2.8.5.1
Methane Management
Coalbed methane is
 
present in coal
 
operations below
 
drainage.
 
Often the methane
 
concentration
is at such low levels that it can be readily managed with frequent testing and monitoring, vigilance,
and routine mine ventilation.
 
Very high methane concentrations may be present at greater depths.
 
High methane concentrations may require
 
degasification of the coal seam to assure safe mining.
 
Table 22-10:
 
Methane Management (Risk 9)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Methane hazard is present
in mines operating below
drainage.
Injury or loss of life; possible
ignition of gas and mine
explosion; potential loss of
mine and equipment
temporarily or permanently;
additional mine fan, mine
power, ventilation, monitoring
and examination requirements.
Low to moderate levels can
be managed with frequent
examinations, testing and
monitoring within the mine
ventilation system.
 
Excellent rock dust
maintenance minimizes
explosion propagation risk
should an ignition occur.
1
5
5
Very high-level
methane
concentrations may
require coal seam
degasification and
gob degasification if
longwall or pillar
extraction methods
are employed.
1
5
5
22.2.8.5.2
Mine Fires
Mine
 
fires,
 
once
 
common
 
at
 
mine operations,
 
are
 
rare
 
today.
 
Most
 
active
 
coal
 
miners
 
have
 
not
encountered a mine
 
fire.
 
Vastly improved mine power and
 
equipment electrical systems, along
 
with
safe
 
mine
 
practices
 
reduce
 
mine
 
fire
 
risks.
 
Crew
 
training
 
and
 
fire
 
brigade
 
support
 
and
 
training
improve response for containment and
 
control if a
 
fire occurs.
 
Spontaneous combustion within coal
mines, which is the source of most fires that occur today, is not expected to commonly occur at the
Coronado
 
property.
 
When
 
spontaneous
 
combustion
 
conditions
 
are
 
present,
 
monitoring
 
systems
are employed
 
for early
 
detection and
 
mine plans
 
are designed
 
to facilitate
 
isolation, containment
and rapid extinguishment.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
67
Table 22-11:
 
Mine Fires (Risk 10)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Mine fire at underground
or surface mine operation.
Injury or loss of life; potential
loss of mine temporarily or
permanently; damage to
equipment and mine
infrastructure.
Inspection and maintenance
of mine power, equipment
and mine infrastructure;
good housekeeping;
frequent examination of
conveyor belt entries;
prompt removal of
accumulations of
combustible materials.
1
5
5
If spontaneous
combustion
conditions are
present, enhanced
monitoring and
examination
procedures will be
implemented; mine
design will
incorporate features
to facilitate isolation,
containment and
extinguishment of
spontaneous
combustion
locations.
1
5
5
22.2.8.5.3
Availability of Supplies and Equipment
The industry
 
has periodically
 
experienced
 
difficulty receiving
 
timely delivery
 
of mine
 
supplies and
equipment.
 
Availability
 
issues
 
often
 
accompanied
 
boom
 
periods
 
for
 
coal
 
demand.
 
Any
 
future
delivery
 
of
 
supplies
 
and
 
equipment
 
delays
 
are
 
expected
 
to
 
be
 
temporary
 
with
 
limited
 
impact
 
on
production.
Table 22-12:
 
Availability of Supplies and Equipment (Risk 11)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Disruption of availability
for supplies and
equipment.
Temporary interruption of
production.
Force majeure provision in
coal sales agreements to
limit liability for delayed or
lost sales.
3
2
6
Work closely with
customers to assure
delayed coal
delivery rather than
cancelled sales;
monitor external
conditions and
increase inventory
of critical supplies;
accelerate delivery
of equipment when
possible.
3
1
3
22.2.8.5.4
Labor
Work
 
stoppage
 
due
 
to
 
labor
 
protests
 
are
 
considered
 
to
 
be
 
unlikely
 
and
 
accompanied
 
by
 
limited
impact
 
should
 
it
 
occur.
 
Excellent
 
employee
 
relations
 
and
 
communications
 
limit
 
the
 
exposure
 
to
outside protesters.
 
Loss of supervisors
 
and skilled
 
employees to retirement is inevitable;
 
the impact
can be lessened with succession planning, training, and mentorship of new employees.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
68
These will
 
be new
 
mines in
 
an historically
 
United Mine
 
Workers
 
of America
 
(
UMWA
) represented
area.
 
Newer mines
 
in the area
 
are not represented
 
so the precedent
 
has been set.
 
However,
 
the
Residual risk is shown as slightly elevated over some other Coronado properties.
Table 22-13:
 
Labor – Work Stoppage (Risk 12)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Work stoppage due to
strikes, slowdowns or
secondary boycott
activity.
Loss of production and coal
sales; damaged customer and
employee relations; reputation
loss.
Maintain excellent
employee relations and
communications; maintain
frequent customer
communications.
2
3
6
Develop plan for
employee
communications and
legal support to
minimize impact of
secondary boycott
activities.
2
3
6
Table 22-14:
 
Labor – Retirement (Risk 13)
Aspect
Impact
Control Measures
Initial Risk Level
Mitigation
Measures
Residual Risk Level
P
C
R
P
C
R
Retirement of supervisors
and skilled employees.
Loss of leadership and critical
skills to sustain high levels of
safety, maintenance and
productivity.
Monitor demographics
closely and maintain
communications with
employees who are
approaching retirement
age; maintain employee
selection and training
programs.
3
3
9
Maintain selection of
candidates and
implementation of in-
house or third-party
training for
electricians and
mechanics; develop
employee mentoring
program.
3
2
6
23
Recommendations
Coronado is
 
continuing to
 
work both
 
internally and
 
with outside
 
assistance to
 
further define
 
their
Resource Base and to Optimize the LOM Plan.
24
References
Publicly available information from various
 
State and Federal agencies was used where relevant.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
pspCoronado Global Resources Inc.
Statement of Coal Resources and Reserves for the
 
Mon Valley Complex Upper Freeport Holdings
 
in Accordance with the JORC Code and
 
United States SEC Regulation S-K 1300 as of December 31, 2022
 
Northern Appalachian Coal Basin
Pennsylvania, USA
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
69
25
Reliance on Information Provided by the Registrant
A summary of
 
the information provided by Coronado relied upon
 
by MM&A for the purposes
 
of this
TRS is provided in
Table 25-1
.
Table 25-1:
 
Information from Registrant Relied Upon by MM&A
 
Category
Information Provided by Coronado
Report
Section
Marketing
Long-term price forecast used
 
in financial projections
16.2
 
Legal
Mineral control and surface
 
control rights as shown on maps
3.2, 3.3
Environmental
Permit and bonding information
17.3
ex964p78i0
 
 
APPENDIX
A
MM&A QUALIFICATION
ex964p79i0
 
 
ex964p78i0
 
 
APPENDIX
B
MAPS
ex964p81i0
 
 
 
ex964p82i0
 
 
 
ex964p83i0
 
 
ex964p78i0
 
 
APPENDIX
C
GLOSSARY OF TERMS
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Glossary of Abbreviations and Definitions
Abbreviation
Definition
AIPG
American Institute of Professional Geologists
ARMPS
Analysis of Retreat Mining Pillar Stability
ASTM
ASTM International
AVS
Applicant Violator System
bcm
Bank cubic meters
Btu/lb.
British Thermal Unit per pound
CAT
®
Caterpillar Inc.
C.P.G.
Certified Professional Geologist
Carlson
Carlson Mining – formerly SurvCADD
®
 
– a prevalent software package used for
modeling in the Appalachian region
CFR
Code of Federal Regulations
Coronado
Coronado Global Resources Inc.
CSR
Codes of State Rules
 
CSX
CSX Corporation, a rail-based freight transportation
 
company
CTR
Contour mining
Demonstrated
reserves
Demonstrated reserves are the sum of proven
 
and probable reserves.
DEP
Department of Environmental Protection
EBITDA
Earnings before Interest,
 
Taxes,
 
Depreciation, and Amortization
 
EOM
End-of-mine reclamation
EPA
United States Environmental
 
Protection Agency
 
ESA
Limited Phase I Environmental Site Assessment
EVR
Estimated Visual Recovery
Feasibility Study
“…comprehensive technical and economic study of the selected development
option for a mineral project, which includes detailed assessments of all
applicable modifying factors together with any other relevant
 
operational
factors, and detailed financial analysis that
 
are necessary to demonstrate, at
the time of reporting, that extraction is economically viable.
 
According to the
proposed definition, the results of the study may serve as the basis for a final
decision by a proponent or financial institution to proceed with, or finance,
the development of the project. Thus, a feasibility study is more
comprehensive, with a higher degree of accuracy,
 
and yielding results with a
higher level of confidence, than a pre-feasibility study.”
 
Hitachi
Hitachi Construction Machinery Co., Ltd.
HWM
Highwall mining
In situ
Its natural position; said specific of a rock, soil, or fossil when in the situation
in which was originally formed or deposited
Indicated
Resources
Indicated
 
resources
 
are
 
those
 
lying
 
between
 
0.4-kilometer
 
and
 
1.2-kilometer
radius
 
from
 
such an
 
observation
 
point
 
and reported
 
herein
 
as in-situ
 
mineral
resources.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Abbreviation
Definition
Inferred Resources
Inferred
 
resources
 
lie
 
more
 
than
 
a
 
1.2-kilometer
 
radius
 
from
 
a
 
valid
 
point
 
of
measurement but less than 4.8 kilometers from one and reported herein as in-
situ mineral resources.
JORC Code
Australasian Code for
 
Reporting of Exploration
 
Results, Mineral Resources
 
and
Ore Reserves
lb. SO
2
 
/ mm Btu
Pounds per sulfur dioxide per million British thermal units
LJ Hughes
LJ Hughes & Sons, Inc. - drilling Company
LOM
Life-of-mine
M&R
Maintenance and repair
M.B.A.
Master of Business Administration
Measured
Resources
Measured resources are those lying within 0.4-kilometer radius
 
from a valid
point of measurement and reported herein as in-situ mineral resources.
MINER Act
Mine Improvement and New Emergency Response Act of 2006
 
Mineral Reserve
“…the economically mineable part of a Measured and/or Indicated Mineral
Resource.
 
It includes dilution materials and allowances for losses, which occur
when the material is mined or extracted and is defined by studies at
Preliminary Feasibility or Feasibility level as appropriate that include
Modifying Factors.
 
Such studies demonstrate that, at the time of reporting,
extraction of the mineral reserve is economically viable under reasonable
investment and marketing assumptions.”
 
Mineral Resource
“…a concentration or occurrence of solid material of economic interest
 
or on
the Earth’s crust
 
in such form, grade or quality that there are reasonable
prospects for eventual economic extraction.
 
The location, quantity,
 
grade,
continuity and other geological characteristics and continuity of a Mineral
Resource are known, estimated or interpreted
 
from specific geological
evidence and knowledge, including sampling.”
 
MM&A
Marshall Miller & Associates, Inc.
Modifying Factors
“…considerations used to convert Mineral
 
Resources to Mineral Reserves.
These include, but are not restricted to, mining, processing, metallurgical,
infrastructure, economic, marketing,
 
legal, environmental compliance, plans,
negotiations, or agreements with local individuals or groups and
governmental factors.”
MRMR
Mineral Resources to Mineral Reserves
MSHA
United States Department of Labor Mine Safety and Health Administration
MSL
Mean sea level
Mt
Million metric tonnes
NAIP
National Agricultural Imagery Program
NIOSH
National Institute for Occupational Safety
 
and Health
NS
Norfolk Southern Corporation, a rail-based freight
 
transportation company
O&M
Operating and maintenance
 
OSD
Out-of-seam dilution
OSM
U.S. Office of Surface Mining Reclamation and Enforcement
P&L
Profit and loss before tax
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
Abbreviation
Definition
P.E.
Professional Engineer
Preliminary
Feasibility Study
“…as a comprehensive study of a range of options for the technical
 
and
economic viability of a mineral project that has advanced to a stage
 
where a
qualified person has determined (in the case of underground mining) a
preferred mining method, or in the case of surface mining) a pit configuration,
and in all cases has determined an effective method of mineral processing
 
and
an effective plan to sell the product. The study’s
 
financial analysis must have
the level of detail necessary to demonstrate, at the time of reporting, that
extraction is economically viable. In addition, as noted in the proposed
definition of a pre-feasibility study,
 
while a pre-feasibility study is less
comprehensive and results in a lower confidence level than a feasibility
 
study,
a pre-
 
feasibility study is more comprehensive and results
 
in a higher
confidence level than an initial assessment.”
 
Property(ies)
Bituminous coal deposits located in southwestern Pennsylvania.
 
The
Pennsylvania properties include the combined Pangburg,
 
Shaner, and
Fallowfield underground mines in the Upper Freeport seam.
 
QP
Qualified Person
Qualified Person
“…a person who is a mineral industry professional with at least
 
five years of
relevant experience in the type of mineralization and type of deposit under
consideration and in the specific type of activity that person is undertaking on
behalf of the registrant. In addition, the proposed definition requires
 
a
qualified person to be an
eligible member or licensee in good standing of a
recognized professional
 
organization at the
time the technical report is prepared.”
Rec.
Recovery
RECs
Recognized Environmental
 
Conditions
Resource Database
The Resource Database is established by the collection, validation,
 
recording,
storing and processing of data and forms the foundation
 
necessary for the
estimation of Mineral Resource and Mineral
 
Reserve.
 
A quality assurance and quality control program is essential
 
and must be
established to govern the collection of all data.
 
In reporting, a Mineral
Resource must meet the minimum requirement of “reasonable
 
prospects for
economic extraction”.
 
This will require the concurrent collection and storage
of preliminary economic, mining, metallurgical, environmental,
 
legal and
social data and other information for use in the estimation
 
of MRMR.
 
The Resource Database will include both “primary” (observation and
measurement) and “interpreted” data.
 
It is recommended that data be stored
digitally,
 
using a documented, standard format and a reliable storage
 
medium
that allows for easy and complete
 
retrieval of the data.
ROM
Run-of-mine
RPO
Recognized Professional
 
Organizations
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Abbreviation
Definition
S-K 1300
United States Securities and Exchange Commission Regulation
 
S-K 1300
Modernization of Property Disclosures
SEC
U.S. Securities and Exchange Commission
SME
Society for Mining Engineers
SMCRA
Surface Mining Control and Reclamation Act of 1977 is the primary federal
 
law
that regulates the environmental
 
effects of coal mining in the United States.
Strip Ratio
Represented by bcm of overburden to recoverable
 
coal tonnes
 
tph
tonnes per hour
 
TRS
Technical
 
Report Summary
USA
United States of America
USFW
United States Fish and Wildlife
USGS
United States Geologic Survey
 
VALMIN Code
Australasian Code for Public Reporting of Technical
 
Assessments and
Valuations of Mineral
 
Assets
Vulcan™
Vulcan™ software is a product of Maptek™, a provider of software
 
for the
global mining industry.
ex964p78i0
 
 
APPENDIX
D
JORC TABLE 1
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Commentary
Sampling techniques
>
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation, such
as downhole gamma sondes, or handheld XRF instruments, etc.). These examples should not
be taken as limiting the broad meaning of sampling.
>
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
>
Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (e.g.
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In other cases, more explanation may be required,
such as where there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure
 
of
detailed information.
>
Most of the coal samples have been obtained from the Properties by subsurface exploration using
core drilling techniques.
 
The protocol for preparing and testing the samples has varied over time
and is not well documented for the older holes drilled on the Properties.
>
Typical USA core drilling sampling technique is for the coal core sample, once recovered from the
core barrel, to be described then wrapped in a sealed plastic sleeve and placed into a covered core
box, which is the length of the sample so that the core can be delivered to a laboratory in relatively
intact condition and with original moisture content.
>
It is reasonable to assume, given the sophistication level of the previous operators, that these
samples were generally collected and processed under industry best-practices.
 
This assumption is
based on MM&A’s familiarity with the operating companies and the companies used to perform
the analysis.
 
>
Some of the drill holes were air rotary bored and no coal core samples were collected.
 
Seam
thickness for rotary-drilled bore holes is verified by calibrated downhole gamma-density logs.
 
>
Coal samples that were deemed by MM&A geologists to be unrepresentative were not used for
statistical analysis of coal quality, as documented in the tabulations. A representative group of drill
hole samples from the Properties were then checked against the original drill laboratory reports to
verify accuracy and correctness.
 
Drilling techniques
>
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if so, by what method, etc.).
>
The Properties have been extensively explored by subsurface drilling efforts carried out by
numerous entities, most of which were completed prior to acquisition by Coronado.
 
The majority
of the drilling was accomplished using vertical continuous (diamond) coring or air rotary methods.
>
Core drilling methods utilize NX-size (5.4 centimeter) or similar-sized core cylinders to recover core
samples, which can be used to delineate geologic characteristics, and for coal quality testing and
geotechnical logging.
 
>
Data for the rotary drilled holes is mainly derived from downhole geophysical logs, which are used
to interpret coal and rock thickness and depth since logging of the drill cuttings is not reliable.
>
Geophysical logging was performed on many of the holes, either by Geological Logging Systems (a
division of MM&A), other geophysical logging contractors, and on those properties acquired from
CONSOL geophysical logging was often performed by CONSOL’s in-house logging services.
Drill sample recovery
>
Method of recording and assessing core and chip sample recoveries and results assessed.
>
Measures taken to maximise sample recovery and ensure representative nature of the
samples.
>
Whether a relationship exists between sample recovery and grade and whether sample bias
may have occurred due to preferential loss/gain of fine/coarse material.
>
Where available, core recovery thickness of coal samples was reconciled with the thickness
interpreted from geophysical logs.
>
Core recovery of the older coal samples lacking geophysical logs is sometimes not well-
documented: however, when the laboratory results for such holes had anomalous values, the data
was disqualified and not used.
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
2
Criteria
JORC Code explanation
Commentary
Logging
>
Whether core and chip samples have been geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
>
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.)
photography.
>
The total length and percentage of the relevant intersections logged.
>
A wide variety of core-logging techniques exist for the properties.
 
For many of the core holes, the
primary data source is a generalized lithology description by the driller, in some cases
supplemented by a more detailed core log completed by a geologist.
 
>
The logging of core thickness and depth is quantitative.
 
With the exception of the coal seams,
logging of rock strata type is more subjective and best considered as qualitative.
Sub-sampling
techniques and sample
preparation
>
If core, whether cut or sawn and whether quarter, half or all core taken.
>
If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled wet or dry.
>
For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
>
Quality control procedures adopted for all sub-sampling stages to maximise representivity of
samples.
>
Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
>
Whether sample sizes are appropriate to the grain size of the material being sampled.
>
Typical US practice in the Appalachian Basin is that core samples for deep mineable core samples
are not sawn or subsampled (since seams are not of great thickness and the entire seam is mined
and co-mingled).
>
Oftentimes, core for surface-mineable coal seams are bench sampled separately by the various
coal and rock layers (plies).
>
MM&A has exercised diligence to use only those analyses that are representative of the coal
quality parameters for the appropriate mining type for each sample.
Quality of assay data
and laboratory tests
>
The nature, quality and appropriateness of the assaying and laboratory procedures used and
whether the technique is considered partial or total.
>
For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters used
in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
>
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
>
Sample analysis was typically carried out by accredited US laboratories.
 
>
Standard procedure upon receipt of core samples by the testing laboratory is to log the depth and
thickness of the sample, then perform testing as specified by a representative of the operating
company.
 
Each sample is then analyzed in accordance with procedures defined under
ASTM
International (
ASTM
)
 
standards including, but not limited to; washability (ASTM D4371); ash
(ASTM D3174); sulfur (ASTM D4239); Btu/lb. (ASTM D5865); volatile matter (ASTM D3175); Free
Swell Index (
FSI
) (ASTM D720).
>
Geophysical tools are calibrated by the logging company and where possible, validated using a
calibration hole.
Verification of
sampling and assaying
>
The verification of significant intersections by either independent or alternative company
personnel.
>
The use of twinned holes.
>
Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
>
Discuss any adjustment to assay data.
>
All coal intersection data used to generate the geologic model has been cross referenced with the
lithological and geophysical logs by MM&A.
>
Laboratory quality was adjusted from dry basis to reflect the anticipated marketable product
moisture.
>
Coal quality results were verified by spot-check with laboratory analysis sheets by MM&A before
inclusion into the geologic model and use in the resource estimate.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
3
Criteria
JORC Code explanation
Commentary
Location of data points
>
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.
>
Specification of the grid system used.
>
Quality and adequacy of topographic control.
>
Due to the long history of exploration by various parties on the Properties, a wide variety of survey
techniques exist for documentation of data point locations.
 
Many of the older exploration drill
holes appear to have been located by ground survey; more recently completed drill holes are often
located by high-resolution Global Positioning System (
GPS
) units.
>
Grid systems used are typically the State Plane Coordinate System pertinent to each property.
 
>
Topography is based on either the USGS topographic 7.5-minute quadrangle maps or on recent
aerial photogrammetry as necessary (subject to availability).
Data spacing and
distribution
>
Data spacing for reporting of Exploration Results.
>
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
>
Whether sample compositing has been applied.
>
Spacing and distribution of data point information may vary from seam to seam within each mining
area.
 
The areas estimated for coal resource and coal reserve tonnes have been limited so that the
data spacing and distribution is sufficient to establish the degree of geological continuity
appropriate for the estimation and classification of the coal tonnes.
 
>
All of the coal resource tonnes are in the measured, indicated, and inferred categories, and all of
the coal reserve tonnes are in the proved and probable categories in accordance with the JORC
Code and SEC standards.
 
Orientation of data in
relation to geological
structure
>
Whether the orientation of sampling achieves unbiased sampling of possible structures and
the extent to which this is known, considering the deposit type.
>
If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.
>
Drill holes have been vertically drilled.
 
No downhole deviation logs have been collected and it is
therefore not known if the drill holes have deviated away from vertical.
 
Based on the relatively
shallow seam depths, any deviation is expected to be insignificant and immaterial to the geologic
characterization of the Property.
>
The dip of the coal seams is relatively minor and not a material issue for representation of seam
thickness or quality.
Sample security
The measures taken to ensure sample security.
>
Sample handling procedures employed by explorationists follow typical US protocol and should be
adequate to insure sample security.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.
>
MM&A has reviewed all available geological information for the Properties in developing the
geologic model.
 
Only that data deemed suitable has been used for the purpose of generating the
resource and reserve estimates.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
4
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral tenement and
land tenure status
>
Type, reference name/number,
 
location and ownership including agreements or material
issues with third parties such as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and environmental settings.
>
The security of the tenure held at the time of reporting along with any known impediments
to obtaining a licence to operate in the area.
>
The Coronado coal resources are located within three of the United State of America: Virginia;
West Virginia; and Pennsylvania.
 
Control of these Properties is governed by many hundreds of
agreements.
>
MM&A has not carried out separate title verification for the coal properties and has not verified
leases, deeds, surveys or other property control instruments pertinent to the subject resources.
 
>
Coronado has represented to MM&A that it controls the mining rights to the coal deposits as
shown on its property maps, and MM&A has accepted these as being a true and accurate
depiction of the mineral rights controlled by Coronado.
 
The TRS assumes the properties are
developed under responsible and experienced management.
>
There are no known legal or environmental encumbrances that would impede development of the
subject coal reserves.
Exploration done by
other parties
>
Acknowledgment and appraisal of exploration by other parties.
>
The Properties have been extensively explored by subsurface drilling efforts carried out by
numerous entities, most of which were completed prior to acquisition by Coronado.
>
This exploration work was generally performed to prevailing US best practice standards and
deemed adequate for the purposes of this TRS.
 
Geology
>
Deposit type, geological setting and style of mineralisation.
>
The Coronado coal resources are located within the Northern and Central Appalachian Coal Basins.
>
The coal deposits are Carboniferous in age, being of the Pennsylvanian system.
>
Seam of economic significance typically range between 0.3 meters and 1.8 meters in thickness,
with relatively little structural deformation.
>
Regional structure is typically characterized by gently dipping strata to the northwest at less than
one percent.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
5
Criteria
JORC Code explanation
Commentary
Drill hole Information
>
A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
●
easting and northing of the drill hole collar
●
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole
collar
●
dip and azimuth of the hole
●
down hole length and interception depth
●
hole length.
>
If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
>
MM&A reviewed and entered all pertinent data into a digital geologic database for each Coronado
property.
 
The database consists of thousands of data records, which include drill hole and
supplemental coal seam thickness measurements from outcrop and mine exposures.
 
>
All drill holes in the database are provided with a collar elevation and the State Plane Coordinate
System easting and northing coordinate.
>
After MM&A confirmed proper coal seam thickness and correlation, the seam data was modelled
and compiled into coal resource maps.
>
The maps are provided in the TRS; however, a tabulation of the thousands of individual data
records is not practical to include.
Data aggregation
methods
>
In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
>
Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown in detail.
>
The assumptions used for any reporting of metal equivalent values should be clearly stated.
>
Where a coal seam has been bench sampled (typically for surface mining) the individual analyses
for the coal plies are normally weight-averaged to represent the total of recoverable coal.
>
Coal quality summary results have been documented in the TRS.
 
Average coal quality on a per-
seam basis is used to represent the coal resources within a given mining area.
>
Average coal quality for each Coronado complex is provided in Tables 1-1, 1-2 and 1-3 of this TRS.
 
>
No other data aggregations methods are used.
Relationship between
mineralisation widths
and intercept lengths
>
These relationships are particularly important in the reporting of Exploration Results.
>
If the geometry of the mineralisation with respect to the drill hole angle is known, its nature
should be reported.
>
If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length, true width not known’).
>
Coal thickness values from all coal intersections and down hole geophysical logs are considered to
be vertical thicknesses.
 
Seam dip of approximately 2.0 to 3.0 degrees has little effect on the
vertical thickness of the seam.
Diagrams
>
Appropriate maps and sections (with scales) and tabulations of intercepts should be included
for any significant discovery being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate sectional views.
>
Diagrams and maps showing the coal seam intercepts are presented in the TRS.
Balanced reporting
>
Where comprehensive reporting of all Exploration Results is not practicable, representative
reporting of both low and high grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
>
All of the available, qualified exploration data has been included within the tabulations, maps, and
diagrams for this TRS.
>
Both coal thickness and quality data are deemed by MM&A to be reasonably sufficient within the
resource areas. Therefore, there is a reasonable level of confidence in the geologic interpretations
required for coal resource determination based on the available data and the techniques applied
to the data.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
6
Criteria
JORC Code explanation
Commentary
Other substantive
exploration data
>
Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey results;
bulk samples – size and method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential deleterious or contaminating
substances.
>
Informational material available from the U.S. Geological Survey and the respective State Surveys
was used to assist in the Resource estimate.
 
Further work
>
The nature and scale of planned further work (e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
>
Diagrams clearly highlighting the areas of possible extensions, including the main geological
interpretations and future drilling areas, provided this information is not commercially
sensitive.
>
Further work is expected to include additional exploration, geotechnical testing, coal quality
analyses, and coal property acquisition.
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
7
Section 3 Estimation and Reporting of Mineral Resources
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Database
 
integrity
>
Measures taken to ensure that data has not been corrupted by,
 
for example, transcription or
keying errors, between its initial collection and its
 
use for Mineral Resource estimation
purposes.
>
Data validation procedures used.
>
MM&A confirmed coal seam thickness and correlations in databases used for coal deposit
modelling.
 
Representative records were spot-checked for data
 
entry validation.
 
>
Geophysical logs were used wherever available to assist in confirming the seam correlation and to
verify proper seam thickness measurements and recovery of coal samples.
Site
visits
>
Comment on
 
any site
 
visits undertaken
 
by the
 
Competent Person and the outcome of those
visits.
>
If no
 
site visits
 
have been
 
undertaken indicate
 
why this
 
is the case.
>
MM&A is very familiar with the Properties and has conducted multiple site visits throughout the
years.
Geological
interpretation
>
Confidence in (or conversely,
 
the uncertainty
 
of) the geological interpretation of the mineral
deposit.
>
Nature of the data used and of any assumptions
 
made.
>
The effect,
 
if any,
 
of alternative
 
interpretations on
 
Mineral Resource estimation.
>
The use of geology in guiding
 
and controlling
 
Mineral Resource estimation.
>
The factors affecting continuity both of grade and geology.
>
Due to the relative structural simplicity of the deposits and the reasonable continuity of the tabular
coal beds, the principal geological interpretation necessary to define the geometry of the coal
deposits is the proper modeling of their thickness and elevation.
 
>
Both coal thickness and quality data are deemed by MM&A to be reasonable within the resource
areas.
 
>
Therefore, there is a reasonable level of confidence in the geologic interpretations required for coal
resource determination based on the available data and the techniques applied to the data.
Dimensions
>
The extent and variability of the Mineral Resource expressed as length (along strike or
otherwise), plan width, and depth below surface to the upper and lower limits of the Mineral
Resource.
>
The subject coal resource areas mostly exist in discreet, individual deposits of highly variable
dimensions, shapes and depth below the ground surface.
>
Such factors are best depicted in the maps contained in the TRS.
>
Details of the parameters are cited within the TRS and included in the table of Cut-off Parameters
listed in Section 11.1 of the TRS.
 
Estimation
and
modelling techniques
>
The nature and appropriateness
 
of the estimation technique(s) applied and key assumptions,
including treatment of extreme grade values, domaining, interpolation parameters and
maximum distance of extrapolation from data points. If
 
a computer assisted estimation
method was chosen include a description of computer software and parameters used.
>
The availability of check estimates, previous estimates and/or mine production records
 
and
whether the Mineral Resource estimate
 
takes
 
appropriate account
 
of such
 
data.
>
The assumptions made regarding
 
recovery of by-products.
>
Estimation of deleterious elements or other non-grade variables of economic
 
significance (e.g.
sulphur for acid mine drainage characterisation).
>
Geological data was imported into Carlson Mining
®
 
(formerly SurvCADD
®
) geological modelling
software in the form of Microsoft
®
 
Excel files incorporating, drill hole collars, seam and thickness
picks, bottom seam elevations and raw and washed coal quality. These data files were validated
prior to importing into the software.
>
Once imported, a geologic model was created.
>
The geological model was verified and reviewed.
 
>
Resources were estimated by defining seam thickness at each point of observation and by defining
resource confidence arcs around the points of observation.
>
Points of observation for Measured and Indicated confidence arcs were defined for all drill holes
that intersected the seam.
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
8
Criteria
JORC Code explanation
Commentary
>
In the case of
 
block model interpolation, the
 
block size in relation to
 
the average sample
spacing and the search employed.
>
Any assumptions behind modelling of
 
selective mining units.
>
Any assumptions about correlation
 
between variables.
>
Description of how the
 
geological interpretation was
 
used to control the resource estimates.
>
Discussion of basis for using or not
 
using grade cutting or capping.
>
The process of validation,
 
the checking process used, the comparison of
 
model data to drill
hole data, and use of reconciliation data if available.
>
As prescribed by the common United States classification system the following distances from points
of observation were used to define the corresponding Resource category arcs:
-
Inferred Resources – greater than 3,960 feet (1.2 kilometers) but less than 15,840 feet (4.8
kilometers)
-
Indicated Resources – 3,960 feet (1.2 kilometers)
-
Measured Resources – 1,320 feet (0.4 kilometers)
>
The use of the standards commonly used in the United States are appropriate and customary for
this resource jurisdiction and deposition type.
>
MM&A performed a geostatistical analysis test of the Coronado data sets using the Drill Hole
Spacing Analysis (
DHSA
) method.
>
Based on MM&A’s analysis, it would be possible to extend the measured, indicated and inferred
arcs slightly beyond historically accepted practices due to consistent geological settings. The QP’s
have elected not to extend arc distances, introducing a level of conservatism in the coal
classification.
Moisture
>
Whether the tonnages are estimated on a dry basis or with natural moisture, and the method
of determination of the moisture content.
>
Coal resource tonnes are presented on a dry, in-situ basis.
>
Reserve tonnes are presented on a moist basis at anticipated product moisture ranging from 4.0 to
6.0 percent. Moisture content based on historic analyses of shipped coal.
Cut-off Parameters
>
The basis of the adopted cut-off grade(s) or quality parameters applied.
>
The cut-off parameters were tailored for each of the Coronado properties to be in accordance with
mining/ processing capabilities and market conditions prevalent at each operation.
>
Examples include minimum recoverable coal thickness, acceptable ash content and wash recovery,
and manageable overburden to coal ratio for surface mineable coal.
>
Details of the parameters are cited within the TRS and included in the table of Cut-off Parameters
listed in Section 11.1 of this TRS.
>
These cut-off parameters have been developed by MM&A based on its experience with the
Coronado properties and other mining operations of the Central Appalachian coal basin.
 
This
experience includes technical and economic evaluations of numerous properties in the region for
the purposes of determining the economic viability of the subject coal reserves.
Mining factors or
assumptions
Assumptions made regarding possible mining methods, minimum mining dimensions and
internal (or, if applicable, external) mining dilution. It is always necessary as part of the
process of determining reasonable prospects for eventual economic extraction to consider
potential mining methods, but the assumptions made regarding mining methods and
parameters when estimating Mineral Resources may not always be rigorous. Where this is the
>
Mining factors such as dilution, mining and washing recovery are variable and have been applied at
the coal deposits at each operation based on site-specific characteristics.
>
Details of the factors are cited within the TRS.
>
Factors that would typically preclude conversion of a coal resource to coal reserve include the
following: inferred resource classification; absence of coal quality; poor mine recovery; lack of
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
9
Criteria
JORC Code explanation
Commentary
case, this should be reported with an explanation of the basis of the mining assumptions
made.
 
access; insufficient exploration; or uncontrolled surface property for areas of proposed for surface
mining.
 
>
While such factors were used to preclude the conversion of a very limited number of coal resources
to coal reserves in this report, the extensive history of mining on the Properties would suggest that
there are reasonable prospects for eventual economic extractions of all coal resources under
favorable market conditions.
Metallurgical factors
or assumptions
>
The basis for assumptions or predictions regarding metallurgical amenability. It is always
necessary as part of the process of determining reasonable prospects for eventual economic
extraction to consider potential metallurgical methods, but the assumptions regarding
metallurgical treatment processes and parameters made when reporting Mineral Resources
may not always be rigorous. Where this is the case, this should be reported with an
explanation of the basis of the metallurgical assumptions made.
>
The products mined from coal resources controlled by Coronado can be sold into high-, mid-, and
low-volatile metallurgical coal markets because of their inherent quality characteristics.
 
>
Run-of-mine production is washed at the coal preparation plants as needed for quality control.
 
>
Coronado may blend production from multiple sources to manage ash and sulfur content along with
the rheological and petrographic characteristics of the shipped products.
 
Environmental factors
or assumptions
>
Assumptions made regarding possible waste and process residue disposal options. It is always
necessary as part of the process of determining reasonable prospects for eventual economic
extraction to consider the potential environmental impacts of the mining and processing
operation.
 
While at this stage the determination of potential environmental impacts,
particularly for a greenfields project, may not always be well advanced, the status of early
consideration of these potential environmental impacts should be reported. Where these
aspects have not been considered this should be reported with an explanation of the
environmental assumptions made.
>
MM&A completed a Limited Phase I Environmental Site Assessment (ESA) on the Buchanan
property in April 2016, and on the Logan County and Greenbrier Properties in May 2017 on behalf of
Coronado.
 
Coronado reports not having conducted such a study since the MM&A studies.
 
>
The ESAs completed by MM&A included a site inspection, review of historical records, a database
search of State and Federal regulatory records and interviews to identify potential recognized
environmental conditions (RECs) that may create environmental liability for the sites.
 
>
MM&A identified one REC at Greenbrier associated with stained soil and gravel near a fueling and
maintenance area.
 
Coronado reported to MM&A that satisfactory clean-up efforts were completed
at Greenbrier.
 
>
Based on these former ESAs completed by MM&A, it is MM&A’s opinion that Coronado has a
generally typical coal industry record of compliance with applicable mining, water quality, and
environmental laws.
 
Estimated costs for mine closure, including water quality monitoring during
site reclamation, are included in the TRS financial models.
 
Bulk density
>
Whether assumed or determined. If assumed, the basis for the assumptions. If determined,
the method used, whether wet or dry, the frequency of the measurements, the nature, size
and representativeness of the samples.
>
The bulk density for bulk material must have been measured by methods that adequately
account for void spaces (vugs, porosity, etc), moisture and differences between rock and
alteration zones within the deposit.
>
Discuss assumptions for bulk density estimates used in the evaluation process of the different
materials.
>
Laboratory derived seam densities measured in specific gravity were used where available.
 
As
needed, these data were supplemented by estimated seam density values based on the relative
proportion of coal and non-coal material within the seam (typically at 1.30 and 2.25 specific gravity,
respectively).
>
Average seam density was determined for each coal deposit and used to convert coal volumes into
coal tonnage estimates.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
10
Criteria
JORC Code explanation
Commentary
Classification
>
The basis for the classification of the Mineral Resources into varying confidence categories.
>
Whether appropriate account has been taken of all relevant factors (i.e. relative confidence in
tonnage/grade estimations, reliability of input data, confidence in continuity of geology and
metal values, quality, quantity and distribution of the data).
>
Whether the result appropriately reflects the Competent
>
Person’s view of the deposit.
>
The Resource has been classified based on suitable distances from points of observations prescribed
in the common United States classification system.
>
The use of the United States standards is appropriate and customary for this resource jurisdiction
and deposition type.
>
MM&A performed a geostatistical analysis test of the Coronado data sets using the Drill Hole
Spacing Analysis (
DHSA
) method.
>
Based on MM&A’s analysis, it would be possible to extend the measured, indicated and inferred
arcs slightly beyond historically accepted practices due to consistent geological settings. The QP’s
have elected not to extend arc distances, introducing a level of conservatism in the coal
classification.
>
All relevant factors have been accounted for and reflect the Competent Person’s
 
view of the
deposit.
Audits or reviews
>
The results of any audits or reviews of Mineral Resource estimates.
>
MM&A completed prepared a statement of coal resources and reserves for the Properties in
accordance with the JORC Code as of December 31, 2017.
 
MM&A also subsequently updated the
estimate of resources and reserves for depletion as of December 31, 2018, December 31, 2019,
December 31, 2020 and December 31, 2021.
>
MM&A performed a previous audit of the Properties in year 2017 for Coronado based on U.S.
Securities and Exchange Commission (SEC) Industry Guide 7 and USGS Circular 891 standards.
 
>
Earlier audits were performed by various independent consultants for predecessors-in-title to
Coronado and at various levels of detail depending on the clients concerns and the allotted time for
completion.
 
Previous audits and reviews defined the primary coal resource areas and estimated the
recoverable tonnes for each seam based on the expected mining methods.
 
>
Additionally, MM&A has performed proprietary evaluations for predecessors-in-title to Coronado,
which encompass portions of the Properties included in this TRS.
Discussion of relative
accuracy/ confidence
>
Where appropriate a statement of the relative accuracy and confidence level in the Mineral
Resource estimate using an approach or procedure deemed appropriate by the Competent
Person. For example, the application of statistical or geostatistical procedures to quantify the
relative accuracy of the resource within stated confidence limits, or, if such an approach is not
deemed appropriate, a qualitative discussion of the factors that could affect the relative
accuracy and confidence of the estimate.
>
The statement should specify whether it relates to global or local estimates, and, if local, state
the relevant tonnages, which should be relevant to technical and economic evaluation.
Documentation should include assumptions made and the procedures used.
>
These statements of relative accuracy and confidence of the estimate should be compared
with production data, where available.
>
The relative accuracy of and confidence in the coal tonnage and quality estimates provided herein
are judged to be in conformance with current industry best-practices.
 
>
The representation of average coal quality characteristics should be understood to represent a
reasonably representative sampling that is generally indicative of coal quality and does not
represent a statistically rigorous approach to coal quality modeling.
>
Resource estimation has been completed using standard coal estimation methods which are
deemed appropriate for this deposit.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
11
Section 4 Estimation and Reporting of Ore Reserves
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral Resource
estimate for conversion
to Ore Reserves
 
>
Description of the Mineral Resource estimate used as a basis for the conversion to an Ore
Reserve.
>
The coal resource estimate was prepared as part of the report Coronado Global Resources Inc.
Statement of Coal Resources and Reserves in Accordance with JORC Code and United States SEC
Standards as of December 31, 2022 – Northern and Central Appalachian Coal Basins – Virginia,
West Virginia and Pennsylvania, USA – February 2023 prepared by MM&A.
>
The resource estimation criteria were developed by MM&A based on the capabilities of the mining
equipment used within the production model and on industry-accepted standards to assure that
the basic geologic characteristics of the coal resources are in reasonable conformity with those to
be mined and marketed by Coronado.
>
Clear statement as to whether the Mineral Resources are reported additional to, or inclusive
of, the Ore Reserves.
>
Coal resources generally are reported inclusive of the coal reserves.
 
In some cases, resources are
reported in addition to coal reserves.
 
Tables 1-1 and 11-3 of the TRS clearly identify resources
“inclusive of mine plan” from which coal reserves were estimated along with those resources
“exclusive of mine plan” from which no reserves were estimated.
 
Site visits
 
>
Comment on any site visits undertaken by the Competent Person and the outcome of those
visits.
>
MM&A is very familiar with the Properties and has conducted multiple site visits throughout the
years.
Study status
 
>
The type and level of study undertaken to enable Mineral Resources to be converted to Ore
Reserves.
>
A preliminary feasibility LOM plan was prepared by MM&A for active and proposed mines.
 
>
The Code requires that a study to at least Pre-Feasibility Study level has been undertaken to
convert Mineral Resources to Ore Reserves. Such studies will have been carried out and will
have determined a mine plan that is technically achievable and economically viable, and that
material Modifying Factors have been considered.
>
This geologic evaluation conducted in accordance with JORC and SEC standards and in conjunction
with the preliminary feasibility study is sufficient to conclude that the surface, highwall miner and
underground coal reserves identified on the Properties are economically mineable under
reasonable expectations of market prices for thermal and metallurgical coal products, estimated
operation costs, and capital expenditures.
>
The pre-feasibility financial models, prepared by MM&A for this TRS, was developed to test the
economic viability of each coal resource area.
>
Proved and probable coal reserve were derived from the defined in-situ coal resource considering
relevant processing, economic (including independent estimates of capital, revenue and cost,
marketing, legal, environmental, socioeconomic, and regulatory factors).
Cut-off parameters
 
>
The basis of the adopted cut-off grade(s) or quality parameters applied.
>
The cut-off parameters were tailored for each of the Coronado properties to be in accordance with
mining/ processing capabilities and market conditions prevalent at each operation.
>
Examples include minimum recoverable coal thickness, acceptable ash content and wash recovery,
and manageable overburden to coal ratio for surface mineable coal.
>
Details of the parameters are cited within the TRS and included in the table of Cut-off Parameters
listed in Section 11.1 of this TRS.
>
These cut-off parameters have been developed by MM&A based on its experience with the
Coronado properties and are typical of mining operations in the Central Appalachian coal basin.
 
This experience includes technical and economic evaluations of numerous properties in the region
for the purposes of determining the economic viability of the subject coal reserves.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
12
Criteria
JORC Code explanation
Commentary
Mining factors or
assumptions
 
>
The method and assumptions used as reported in the Pre-Feasibility or Feasibility Study to
convert the Mineral Resource to an Ore Reserve (i.e. either by application of appropriate
factors by optimisation or by preliminary or detailed design).
>
After validating coal seam data and establishing correlations, the thickness and elevation for seams
of economic interest were used to generate a geologic model.
>
A pre-feasibility LOM plan was prepared by MM&A for active and proposed mines.
 
MM&A
prepared mine projections and production timing forecasts based on coal seam characteristics.
 
Production timing was carried out from 2023 to depletion (exhaustion) of the coal reserve areas.
>
The choice, nature and appropriateness of the selected mining method(s) and other mining
parameters including associated design issues such as pre-strip, access, etc.
>
The room-and-pillar mining method was selected to model the underground mining resources,
utilizing continuous miners for coal extraction, shuttle cars for production section haulage and roof
bolters for roof control, with the exception that the Buchanan Mine also uses longwall shearers,
armored face conveyors, and hydraulic self-advancing roof support.
 
The resource areas located
above drainage are relatively small and often have irregular boundaries.
The Buchanan Mine in
Buchanan County, Virginia is the only active longwall mine currently being operated by Coronado.
>
The Coronado underground mining resource areas which are located above-drainage require an
access road and mine access development along the outcrop, whereas below-drainage mines are
accessed via shaft or slope based on other proposed surface infrastructure locations and/or
surface property control.
 
>
The surface mining method selected utilizes highly productive hydraulic shovels, front-end loaders,
large tractors and rock trucks for overburden removal.
 
The mobile equipment spreads adapt
readily to winding coal outcrops for contour surface mining and are effective for point-removal
and area mining applications.
>
Application of highwall and auger mining units is an effective method to recover coal resources not
suitable for underground mining and under excessive cover for surface mining.
>
The assumptions made regarding geotechnical parameters (e.g. pit slopes, stope sizes, etc.),
grade control and pre-production drilling.
>
Mining plans for potential underground mines were developed by MM&A.
 
Pillar stability was
tested by MM&A using the
Analysis of Coal Pillar Stability (ACPS
) program that was developed by
the
National Institute for Occupational Safety and Health (
NIOSH
)
.
 
>
Coronado must obtain approved mining plans from
United States Department of Labor Mine
Safety and Health Administration (
MSHA
)
that define safety parameters for the highwalls
developed during contour and area mining.
 
MM&A’s planning model does not require input of
specific highwall design parameters, but provides for timing of mining within mine plan polygons
that is representative of the operation performance attained at Central Appalachia surface mines.
>
Highwall and auger mining is conducted under highwalls designed and constructed to meet MSHA
permit requirements.
 
To better assure highwall stability and safety
 
during highwall coal
extraction, MSHA requires that coal fenders, or stumps, be left in place between successive cuts.
Periodic barrier pillars must be left in place as an additional safeguard.
 
MM&A has adjusted the
expected mining recovery for highwall and auger mining resources to reflect highwall stability and
safety requirements.
>
The major assumptions made and Mineral Resource model used for pit and stope
optimisation (if appropriate).
>
Underground Mining Resources:
 
For metallurgical resources, minimum coal seam thickness
extends down to between 0.6 and 1.2 meters and a minimum overburden (depth of cover) of 30.5
meters.
 
A 61-meter horizontal distance is maintained from abandoned mines and sealed or
pillared areas, and a 30-meter horizontal distance is maintained from planned highwall miner
panels.
 
Mine recovery is reduced when a rider coal seam is present within a 1.5- to 3.0-meter
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
13
Criteria
JORC Code explanation
Commentary
interval above the coal seam.
 
No mining is projected when the interval between overlying and
underlying reserves is less than 12 meters.
>
Surface Mining Resources:
 
For classification as a surface-mineable resource, a seam must be at
least 0.3 meters in thickness as a stand-alone (principle) seam and 0.15 meters in thickness when
less than 0.8 meters from a principal seam.
 
The maximum cumulative area mining strip ratio is
generally 20:1 for thermal coal and 30:1 for metallurgical coal.
 
Some areas were assessed for their
economic viability at higher ratios, and were included as reserves if deemed economic.
 
For
contour surface mining, a minimum of 38-meter bench is provided to support HWM.
>
HWM and Auger Mining Resources: HWM cut depth (penetration) is established at a maximum of
244 meters.
 
The minimum mineable coal thickness is limited at 0.6 meters. For coal seams less
than 0.8 meters thick, roof and/or floor characteristics must allow OSD cutting to maintain a 0.8-
meter minimum cutting height.
Auger mining cut depth is established at an average of 91 meters.
 
The minimum mineable coal thickness is limited at 0.5 meters.
>
The mining dilution factors used.
>
Underground Mining Reserves:
 
The planning model assigns minimum mining heights of 1.4 to 1.8
meters for mains and panel development.
 
At the Buchanan Mine, a minimum mining height of 1.8
meters was used due to the longwall mining method being employed.
 
For coal seams thinner than
the assigned mining height, the difference between the coal seam height and assigned mining
height consists of OSD.
 
In all cases a minimum of 0.05 meters of OSD was assumed, with the
exception of the Mon Valley mines, where a minimum 0.15 meters of OSD was assumed due to
weaker floor strata.
>
Surface Mining Reserves:
 
Area mining is generally limited to a cumulative overburden ratio of 30:1
and a 15:1 ratio for contour mining.
 
Exceptions were considered for mining of metallurgical grade
coal where deemed economical.
 
It is assumed that careful cleaning of exposed coal pits will result
in minimal OSD.
>
HWM and Auger Mining Reserves:
 
The mining plan assumes that the HWM cutting height is a
minimum of 76 to 99 centimeters for clearance purposes.
 
When the coal seam is less than 76 to
99 centimeters thick, OSD assumed and included in the ROM product.
Because the auger has very
limited OSD cutting ability, it is assumed that an appropriate auger diameter will be chosen based
on the coal seam thickness and that OSD will be minimal.
>
The mining recovery factors used.
>
Underground Mining Reserves:
 
Mine recovery generally varies between 40 and 60 percent for
continuous mining panels, and 100 percent for longwall.
>
Surface Mining Reserves:
 
Mining recovery is 90 percent for virgin areas.
 
Mining recovery is
reduced where second mining is projected in previously underground and auger mined areas.
>
HWM and Auger Mining Reserves:
 
A mine recovery of 40 percent has been applied for HWM.
A
mine recovery of 35 percent has been applied for auger mining.
>
Any minimum mining widths used.
>
Underground Mining Reserves:
 
Typical entry width is 5.8 to 6.1 meters.
>
The manner in which Inferred Mineral Resources are utilised in mining studies and the
sensitivity of the outcome to their inclusion.
>
Proved and probable coal reserve were derived from the defined in-situ coal resource considering
relevant processing, economic (including independent estimates of capital, revenue and cost,
marketing, legal, environmental, socioeconomic, and regulatory factors).
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
14
Criteria
JORC Code explanation
Commentary
>
Mine plan LOM tonnage includes inferred coal and those areas that do not meet the minimum coal
thickness requirement for classification as reserve.
 
Inferred coal represents
 
approximately 0.6% of
the LOM production for Mon Valley and 0.000001% of the total LOM production for Logan.
 
None
of this coal was included in the estimate of reserves.
>
The infrastructure requirements of the selected mining methods.
>
Underground Mining Resources:
 
The continuous mining method provides for the extraction of
coal from the production faces using continuous miners (and longwall shearing machine at
Buchanan) and haulage using shuttle cars or battery haulers to a feeder-breaker located at the tail
of the section conveyor belt.
 
The feeder-breaker crushes large pieces of coal and rock and
regulates coal feed onto the mine conveyor.
 
A chain conveyor is used to remove coal from the
longwall face at the Buchanan Mine for placement onto the conveyor belt which is ultimately
delivered to an underground storage bunker.
 
Roof-bolting machines are used to install roof bolts,
and battery scoops are available to clean the mine entries and assist in delivery of mine supplies to
work areas.
 
Surface ventilation fans are installed as needed to provide a sufficient volume of air
to ventilate production sections, coal haulage and transport entries, battery charging stations, and
transformers in accordance with approved plans.
>
Coronado currently operates three coal preparation plants, one each at the Buchanan, Logan
County and Greenbrier Divisions.
 
The Buchanan Plant operates at a feed rate of approximately
907 raw tonnes per hour (
tph
), whereas the Saunders Plant (Logan County Division) has a nominal
feed rate of 816 tph, and the Mountaineer Plant (Greenbrier Division) operates at 544 tph.
MM&A
has included capital estimates for construction of additional coal preparation plants at the Russell
County and Mon Valley Complex for the purposes of this TRS.
 
>
Surface Mining Resources: The surface mining mobile equipment spreads advance the contour and
area mining pits while systematically reclaiming the trailing side of pits where coal has been
removed.
 
The coal haul roads are extended and maintained as the pits advance.
 
Support facilities
are maintained nearby but away from the active mining, and include storage areas for blasting
agents, fuel and lubricants, and mine supplies along with maintenance facilities and offices.
 
Most
of the surface mine production is transported to a loading point for crushing, blending and direct-
shipment to customers.
 
>
HWM and Auger Resources: The HWM equipment advances along with the contour mining pits.
 
The rate of advance of the contour mining is governed by the advancement rate of the HWM.
 
A
diesel-powered generator trails the highwall miner and powers the continuous mining unit.
 
Other
support facilities are provided along with the contour mining support facilities.
 
HWM production
is all transported by truck to the coal preparation plant for washing.
Metallurgical factors or
assumptions
 
>
The metallurgical process proposed and the appropriateness of that process to the style of
mineralisation.
>
Coarse material is washed in a heavy medium vessel.
 
Intermediate-size material is washed in
heavy medium cyclones.
 
Fine material is washed using conventional froth flotation cells.
>
Whether the metallurgical process is well-tested technology or novel in nature.
>
Processes are typical of those used in the coal industry and are in use at adjacent coal processing
plants.
>
The nature, amount and representativeness of metallurgical test work undertaken, the
nature of the metallurgical domaining applied and the corresponding metallurgical recovery
factors applied.
>
The quality characteristics for the subject coal resources and coal reserves have been reviewed in
detail by MM&A.
 
The drill hole data were utilized to develop average coal quality characteristics
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
15
Criteria
JORC Code explanation
Commentary
mining site.
 
These average coal quality characteristics were then utilized as the basis for
determining the various markets into which the saleable coal will likely be placed.
>
Any assumptions or allowances made for deleterious elements.
>
No significant effects on product quality are anticipated from dilution material; float product
quality was used to model final product quality.
>
The existence of any bulk sample or pilot scale test work and the degree to which such
samples are considered representative of the orebody as a whole
>
No bulk sample or pilot scale work has been completed.
>
For minerals that are defined by a specification, has the ore reserve estimation been based
on the appropriate mineralogy to meet specifications?
>
Notwithstanding the complexity of the coal quality data set, the seams of the central and northern
Appalachian coalfields have a long history of providing both high-Btu thermal coals and high-, mid-
and low-volatile coking coals with favorable metallurgical properties.
Environmental
 
>
The status of studies of potential environmental impacts of the mining and processing
operation. Details of waste rock characterisation and the consideration of potential sites,
status of design options considered and, where applicable, the status of approvals for
process residue storage and waste dumps should be reported.
>
MM&A completed a Limited Phase I Environmental Site Assessment (
ESA
) on the Buchanan
property in April 2016, and on the Logan County and Greenbrier Properties in May 2017 on behalf
of Coronado.
>
MM&A identified one REC at Greenbrier associated with stained soil and gravel near a fueling and
maintenance area.
 
Coronado reported to MM&A that satisfactory clean-up efforts were
completed at Greenbrier.
>
Based on these former ESAs completed by MM&A, it is MM&A’s opinion that Coronado has a
generally typical coal industry record of compliance with applicable mining, water quality, and
environmental laws.
 
Estimated costs for mine closure, including water quality monitoring during
site reclamation, are included in the TRS financial models.
Infrastructure
 
>
The existence of appropriate infrastructure: availability
 
of land for plant development,
 
power,
water, transportation (particularly for bulk
 
commodities), labour, accommodation; or
 
the ease
with which the infrastructure can be provided or accessed.
>
Coronado currently operates one surface mine (Toney Fork Mine at the Logan Mine Complex);
Coronado also controls the idle Midland Surface Mine at the Greenbrier Mine Complex.
 
>
Coronado operates five underground mines as follows:
 
Buchanan Mine at the Buchanan Mine
Complex; Winifrede, Eagle No. 1, Muddy Bridge and Lower War Eagle Mines in the Logan Mine
Complex; the Mountaineer #1 Mine at the Greenbrier Mine Complex is currently idle.
>
All ROM production is currently planned for either truck transportation from the mines to the
processing or shipping facilities, or in some cases there is either a current or planned mine mouth
preparation plant and barge/rail loading facility.
 
>
There is a network of public highways that provide serviceable coal haul routes and private,
internal roads on the Properties would be developed as may be needed.
 
Rail service to the
Properties is most readily provided by NS and CSX
with connections to both domestic consumers
and international trans-shipment points.
 
NS track is located across the Monongahela River from
the proposed Pangburn Hollow load-out facility.
 
Coal would be shipped to customers via barge
and rail and sold as both metallurgical and thermal products.
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
16
Criteria
JORC Code explanation
Commentary
Costs
 
>
The derivation of, or assumptions made, regarding projected capital costs in the study.
>
The methodology used to estimate operating costs.
>
Coronado provided historical and 5-year budget operating costs for its active mines for MM&A’s
review.
 
MM&A used the historical and/or budget cost information as a reference and developed
personnel schedules for each mine.
 
Hourly labor rates and salaries were based upon information
contained in Coronado’s financial summaries.
 
Fringe benefit costs were developed for vacation
and holidays, federal and state unemployment insurance, retirement, workers’ compensation and
pneumoconiosis, casualty and life insurance, healthcare and bonuses.
 
A cost factor for mine
supplies was developed that relates expenditures to mine advance rates for roof control costs and
other mine supply costs at underground mines.
 
Other factors were developed for maintenance
and repair costs, rentals, mine power, outside services and other direct mining costs.
>
Surface mine direct operating costs were developed as a function of overburden ratio for repair
and maintenance supplies, diesel fuel, explosives and blasting, and miscellaneous supplies and
services.
 
Operating costs for highwall mines are based on costs per ROM tonne estimates.
 
Other
cost factors were developed for coal preparation plant processing, refuse handling, coal loading,
trucking, property taxes, and insurance and bonding.
 
Appropriate royalty rates were assigned for
production from leased coal lands and sales taxes were calculated for state severance taxes, the
federal black lung excise tax, and federal and state reclamation fees.
>
Capital schedules were developed by MM&A for mine development, infrastructure, and on-going
capital requirements for the life of each projected mine.
>
Staffing levels were prepared and operating costs estimated by MM&A for each projected mine.
 
MM&A utilized historical cost data provided by Coronado and its own knowledge and experience
to estimate direct and indirect operating costs.
 
>
Allowances made for the content of deleterious elements.
>
No allowances have been made for deleterious elements; no impact to quality from deleterious
elements is anticipated.
>
The derivation of assumptions made of metal or commodity price(s), for the principal
minerals and co- products.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges.
 
Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne.
 
MM&A utilized this data for price
forecasting in financial modeling.
>
Derivation of transportation charges.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges.
 
Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne.
 
MM&A utilized this data for price
forecasting in financial modeling.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
17
Criteria
JORC Code explanation
Commentary
>
The basis for forecasting or source of treatment and refining charges, penalties for failure to
meet specification, etc.
>
MM&A utilized historical cost data provided by Coronado and its own knowledge and experience
to estimate direct and indirect operating costs.
 
All ROM production is currently planned for either
truck transportation from the mines to the processing or shipping facilities, or in some cases there
is either
 
a current or planned mine mouth preparation plant and barge/rail loading facility.
>
The allowances made for royalties payable, both Government and private.
>
Appropriate royalty rates were assigned for production from leased coal lands and sales taxes were
calculated for state severance taxes, the federal
 
black lung excise tax, and federal and state
reclamation fees.
Revenue factors
 
>
The derivation of, or assumptions made regarding revenue factors including head grade,
metal or commodity price(s) exchange rates, transportation and treatment charges,
penalties, net smelter returns, etc.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges.
 
Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne.
 
MM&A utilized this data for price
forecasting in financial modeling.
>
The derivation of assumptions made of metal or commodity price(s), for the principal metals,
minerals and co-products.
>
Coal sales prices as defined above.
 
All reported reserves are on a marketable basis.
Market assessment
 
>
The demand, supply and stock situation for the particular commodity, consumption trends
and factors likely to affect supply and demand into the future.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges.
 
Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne.
 
MM&A utilized this data for price
forecasting in financial modeling.
>
A customer and competitor analysis along with the identification of likely market windows
for the product.
>
All of the mine production serves metallurgical and thermal markets.
 
The metallurgical coal is
marketed as high-volatile (typically 28 percent or greater volatile matter content); mid-volatile
(typically 23- to 27-percent volatile matter content) and low-volatile (typically less than 23 percent
volatile matter content) products.
>
Raw ROM production that requires washing is currently processed through Coronado owned and
operated coal preparation plants.
 
>
ROM coal that does not require further processing is delivered directly to the loading points for
sizing and delivery to customers.
 
Coronado has access to two rail-loading points serviced by the
Norfolk Southern Corporation (
NS
)
 
and two rail-loading points serviced by
CSX Corporation (
CSX
)
.
>
Price and volume forecasts and the basis for these forecasts.
>
Carlson Mining
®
 
was used by MM&A to generate mine plans for underground-
 
and surface-
mineable coal seams.
 
Underground mine plans were sequenced based on productivity schedules
provided by Coronado, which were based on historically achieved productivity levels.
 
Surface mine
plans were generated under productivity assumptions (bank cubic yard per shift) as provided by
Coronado and reviewed by MM&A, again based heavily on productivity levels achieved by
Coronado.
 
All production forecasting ties assumed production rates to geological models as
constructed independently by MM&A’s team of geologists and mining engineers.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
18
Criteria
JORC Code explanation
Commentary
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges.
 
Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne.
 
MM&A utilized this data for price
forecasting in financial modeling.
Economic
 
>
The inputs to the economic analysis to produce the net present value (NPV) in the study, the
source and confidence of these economic inputs including estimated inflation, discount rate,
etc.
>
On an unlevered basis, the NPV of the project cash flows after taxes was estimated for the purpose
of classifying coal reserves.
 
The project cash flows, excluding debt service, are calculated by
subtracting direct and indirect operating expenses and capital expenditures from revenue.
 
Direct
costs include labor, drilling and blasting, operating supplies, maintenance and repairs, facilities
costs for materials handling, coal preparation, refuse disposal, coal loading, sampling and analysis
services, reclamation and general and administrative costs.
 
Indirect costs include statutory and
legally agreed upon fees related to direct extraction of the mineral.
 
The indirect costs are the
Federal black lung tax, Federal and State reclamation taxes, property taxes,
 
local transportation
prior to delivery at rail or barge loading sites, coal production royalties, sales and use taxes, income
taxes and State severance taxes. Coronado’s
 
historical costs provided a useful reference for
MM&A’s cost estimates.
>
Coronado provided MM&A with price forecasts for all Properties.
 
Customer coal pricing is derived
from market observed forward estimates based on global economic supply and demand analysis
which is applied to mine plan sales volumes and product mix and is supplemented with Coronado’s
in-house knowledge of applicable rail transportation charges, ocean freight charges and port
charges.
 
Coal price forecasts for the various products were provided by Coronado for various coal
markets in terms of US nominal dollars per metric tonne.
 
MM&A utilized this data for price
forecasting in financial modeling.
>
All costs and prices are based on 2022 nominal United States dollars.
>
A pre-feasibility LOM plan was prepared by MM&A for active and proposed mines.
 
MM&A
prepared mine projections and production timing forecasts based on coal seam characteristics.
 
Production timing was carried out from 2023 to depletion (exhaustion) of the coal reserve areas,
which is projected for the year 2100.
>
The all-mines average cash cost ranges between approximately $65 and $317 per tonne for most
of the operating period.
>
NPV ranges and sensitivity to variations in the significant assumptions and inputs.
>
An estimate of NPV at a base discount rate of 10.0% was included in Section 19 of the TRS.
>
NPV of the Buchanan, Russell, Mon Valley,
 
Logan and Greenbrier Properties was estimated to be
$1.562 billion, $92.2 million, $168.3 million, $366.6 million and
 
$62.7 million, respectively.
>
The sensitivity study shows the NPV at the 10.0% discount rate when Base Case sales prices,
operating costs, and capital costs are increased and decreased in increments of 5% within a +/-
15% range.
 
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
19
Criteria
JORC Code explanation
Commentary
Social
 
>
The status of agreements with key stakeholders and matters leading to social license to
operate.
>
Portions of the properties are located near local communities.
 
Regulations prohibit mining
activities within 91 meters of a residential dwelling, school, church, or similar structure unless
written consent is first obtained from the owner of the structure.
 
Where required, such consents
have been obtained where mining is proposed beyond the regulatory limits.
Other
 
To the extent relevant, the impact of the following on the project and/or on the estimation and
classification of the Ore Reserves:
>
Any identified material naturally occurring risks.
>
No material naturally occurring risks have been identified.
>
The status of material legal agreements and marketing arrangements.
>
The Coronado coal resources are located in Buchanan, Russell and Tazewell Counties, Virginia;
Greenbrier, Logan, Boone, Wyoming and Greenbrier Counties, West Virginia; Allegheny,
Washington and Westmoreland Counties, Pennsylvania.
>
MM&A has not carried out separate title verification for the coal properties and has not verified
leases, deeds, surveys or other property control instruments pertinent to the subject resources.
>
Coronado has represented to MM&A that it controls the mining rights to the reserves as shown on
its property maps, and MM&A has accepted these as being a true and accurate depiction of the
mineral rights controlled by Coronado.
 
The TRS assumes the properties are developed under
responsible and experienced management.
>
The status of government agreements and approvals critical to the viability of the project,
such as mineral tenement status and government and statutory approvals. There must be
reasonable grounds to expect that all necessary Government approvals will be received
within the timeframes anticipated in the Pre-Feasibility or Feasibility study. Highlight and
discuss the materiality of any unresolved matter that is dependent on a third part on which
extraction of the reserve is contingent.
>
Coronado has obtained all mining and discharge permits to operate 34 underground mines, 13
surface mines, and 18 processing, loadout or related facilities.
 
MM&A is unaware of any obvious
or current Coronado permitting issues that are expected to prevent the issuance of future permits.
 
Coronado, along with all Central and Northern Appalachian basin coal producers, is subject to a
level of uncertainty regarding future clean water permits due to
United States Environmental
Protection Agency
(
EPA
)
 
involvement with state programs.
Classification
 
>
The basis for the classification of the Ore Reserves into varying confidence categories.
Whether the result appropriately reflects the Competent Person’s view of the deposit. The
proportion of Probable Ore Reserves that have been derived from Measured Mineral
Resources (if any).
>
Measured and indicated resources have been converted to proved and probable reserves,
respectively.
>
None of the probable coal reserves have been derived from measured resources.
>
In a limited number of cases where there was only very limited data available to demonstrate the
metallurgical suitability of a given coal deposit, that deposit was classified as a probable reserve
instead of a proved reserve.
>
The results of this TRS define an estimated total initial ROM recoverable ore (coal) reserve
estimate of 551 million tonnes for Coronado as follows:
a)
Buchanan =
 
154 Mt
b)
Logan
 
=
 
138 Mt
c)
Greenbrier=
 
12 Mt
d)
Russell =
 
50 Mt
e)
Mon Valley =
 
197 Mt
 
>
Coronado controls a total of 334 Mt (moist basis) of marketable coal reserves for Coronado as of
December 31, 2022 (total may not add due to rounding).
 
Of that total, 74 percent are proved, and
26 percent are probable.
 
Total reserves by complex are as follows:
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
20
Criteria
JORC Code explanation
Commentary
a)
Buchanan =
 
93 Mt
b)
Logan
 
=
 
71 Mt
c)
Greenbrier=
 
7 Mt
d)
Russell =
 
30 Mt
e)
Mon Valley =
 
134 Mt
 
Audits or reviews
>
The results of any audits or reviews of Ore Reserve estimates.
>
MM&A completed prepared a statement of coal resources and reserves for the Properties in
accordance with the JORC Code as of December 31, 2017.
 
MM&A also subsequently updated the
estimate of resources and reserves for depletion as of December 31, 2018, December 31, 2019,
December 31, 2020 and December 31, 2021.
>
MM&A performed a previous audit of the Properties in year 2017 for Coronado based on
U.S.
Securities and Exchange Commission (
SEC
)
 
Industry Guide 7 standards.
 
Earlier audits were
performed by various independent consultants for predecessors-in-title to Coronado and at
various levels of detail depending on the clients concerns and the allotted time for completion.
 
Previous audits and reviews defined the primary coal resource areas and estimated the
recoverable tonnes for each seam based on the expected mining methods.
>
Additionally, MM&A has performed proprietary evaluations for predecessors-in-title to Coronado,
which encompass portions of the Properties included in this TRS.
Discussion of relative
accuracy/ confidence
 
>
Where appropriate a statement of the relative accuracy and confidence level in the Ore
Reserve estimate using an approach or procedure deemed appropriate by the Competent
Person. For example, the application of statistical or geostatistical procedures to quantify the
relative accuracy of the reserve within stated confidence limits, or, if such an approach is not
deemed appropriate, a qualitative discussion of the factors which could affect the relative
accuracy and confidence of the estimate.
>
Operations on the Properties by Coronado and its predecessors have been on-going for many
years.
 
>
MM&A is confident that the mine plans and financial models are reasonably representative to
provide an accurate estimation of coal reserves.
>
Mine development and operation have not been optimized within the TRS.
>
The statement should specify whether it relates to global or local estimates, and, if local,
state the relevant tonnages, which should be relevant to technical and economic evaluation.
Documentation should include assumptions made and the procedures used.
>
Proved and probable coal reserve were derived from the defined in-situ coal resource considering
relevant processing, economic (including independent estimates of capital, revenue and cost),
marketing, legal, environmental, socioeconomic, and regulatory factors on a global scale as current
local data reflects the global assumptions.
>
Accuracy and confidence discussions should extend to specific discussions of any applied
Modifying Factors that may have a material impact on Ore Reserve viability, or for which
there are remaining areas of uncertainty at the current study stage.
The major risk factors for the active Coronado mines and future resource development are
summarized below:
>
Mine Accidents
>
Highwall Failure.
 
Highwall failures are likely to result in a temporary mine closure and should not
have a material impact on the mine sustainability.
 
The risk is considered to be probable.
 
>
Adverse Geological Conditions.
 
Adverse geological conditions include such conditions as faults and
sandstone washouts.
 
The risk is considered to be probable.
 
The impact is expected to be
temporary with little material impact on mine sustainability.
>
Environmental Risk.
 
Numerous federal and state permits are required to operate coal mines and
mine surface facilities. Permitting rules are complex and may change over time, making
compliance difficult or impossible.
ex964p2i0
 
 
 
 
 
 
 
 
 
 
 
 
 
Statement of Coal Resources and Reserves
in Accordance with SEC and the JORC Code as of December 31, 2021
Northern and Central Appalachian Coal Basins –
 
Virginia, West Virginia and Pennsylvania, USA
 
Appendix D:
 
JORC Table 1
M
ARSHALL
M
ILLER
&
A
SSOCIATES
,
I
NC
.
21
Criteria
JORC Code explanation
Commentary
>
Water Quality.
 
Permit requirements to fulfill Clean Water Act obligations are subject to
modification.
 
The probability of water quality changes having a material impact on mine
operations is possible.
 
As a contemporary example, the selenium discharge issue that affects
western Canadian and Central Appalachian Basin operators has only recently emerged as a
concern and its ultimate impact has not been determined.
>
New Permits.
 
Permit protests by environmental groups and individuals can contribute to permit
delays or denial and increase the cost of permitting and delay development.
 
Surface mining
activities, coal refuse disposal and construction of access roads in mountainous terrain often
require storage of material in valley fills.
 
Authority to dispose of fill material into waters of the
United States must be granted by the
United States Army Corps of Engineers (
COE
)
.
 
COE permits
are increasingly difficult to obtain.
>
Regulatory Requirements.
 
Adverse impact from regulatory changes is considered to be probable.
 
The impact will likely affect the broader industry and is not expected to result in mine closure.
>
Market Risk.
 
Metallurgical and thermal coal markets ultimately depend upon the global steel and
thermal coal demand and are considered to be volatile.
 
Currently, the US coal market has seen a
decline in demand for thermal coal due to thermal plant closures, as a result of new air and water
pollution regulations, and competition from other commodities used for power generation such as
natural gas.
 
This has resulted in an overall decline in CAPP coal production.
 
Continued regulatory
changes and declining demand could result in material changes in domestic and global coal
markets.
 
The impact cannot be predicted at this time; however, while MM&A expects the coal
reserve within this TRS to remain economically viable throughout the life of the projected mines,
the LOM financial model is very sensitive to changes in coal sales price and therefore market risk is
not insignificant.
>
Labor Risk.
 
Work stoppage due to organized labor protests is considered to be unlikely and not
likely to lead to permanent mine closure.
 
The mines are likely to suffer the loss of key supervisors
and skilled employees due to retirement as the workforce ages.
 
The problem is industry-wide and
the impact is expected to be temporary and have no sustained impact on coal production.
>
Availability of Equipment and Supplies.
 
Risk of equipment and supply availability is likely to be
temporary and should not have a sustained adverse impact on the production of coal.
>
Transportation Delay.
 
Interruption of coal transport services by river or rail is considered to be
probable but unlikely to have a sustained impact on coal production.
>
It is recognised that this may not be possible or appropriate in all circumstances. These
statements of relative accuracy and confidence of the estimate should be compared with
production data, where available.
>
Mine plans, productivity expectations and cost estimates generally reflect historical performance
and efforts have been made to adjust plans and costs to reflect future conditions.